WEST SACRAMENTO CITY COUNCIL AND WEST SACRAMENTO REDEVELOPMENT SUCCESSOR

AGENCY & WEST SACRAMENTO FINANCING AUTHORITY
City Council Regular Meeting
JUNE 18, 2025 AGENDA - AMENDED
Martha Guerrero, Mayor
Verna Sulpizio Hull, Mayor Pro Tem
Quirina Orozco, Council Member
Norma Alcala, Council Member
Dawnté Early, Council Member
Aaron Laurel, City Manager
Jeffrey Mitchell, City Attorney
6:00 PM Closed Session Call to Order
7:00 PM Regular Meeting Call to Order
Pledge of Allegiance
Land Acknowledgment
The meeting will be held at City Hall, City Council Chambers, 1110 West Capitol Avenue, West Sacramento GENERAL ADMINISTRATION FUNCTION – PART I

1. PRESENTATIONS BY THE PUBLIC ON MATTERS NOT ON THE AGENDA WITHIN THE

JURISDICTION OF THE COUNCIL
The Council is prohibited from discussing issues not on the agenda brought to them at this time.

According to State Law (the Brown Act), items must first be noticed on the agenda before any discussion or action.

PRESENTATIONS

2. City Manager's Office

PROCLAMATION RECOGNIZING TOM RAMOS FOR HIS LONGTIME SERVICE ON THE WEST

SACRAMENTO AREA FLOOD CONTROL AGENCY BOARD
Objective: The objective of this item is to recognize Tom Ramos for his years of public service on the West Sacramento Area Flood Control Agency (WSAFCA) Board and his contributions to the City's flood protection strategy.

Recommendation: Staff respectfully recommends that the City Council adopt the attached proclamation recognizing Tom Ramos for his service on the WSAFCA Board and his commitment to advancing flood protection in West Sacramento.

3. City Manager's Office
Anyone wishing to address the Council, or any agenda item, may fill out the Request to Speak card and present it to the City Clerk prior to the completion of staff presentation. Items on the Consent Agenda will be considered in one motion and the Request to Speak card should be turned in prior to the first item on Consent.
1 PRESENTATION OF PROCLAMATION RECOGNIZING JUNE 19TH AS JUNETEENTH

NATIONAL FREEDOM DAY
Objective: The objective of this report is to officially recognize June 19th as Juneteenth National Freedom Day in the City of West Sacramento, promoting awareness and celebration of this significant historical event, and to encourage community engagement.

Recommendation: Staff respectfully recommends that the City Council adopt the proclamation recognizing June 19 as Juneteenth National Freedom Day in the City of West Sacramento.

4. City Manager's Office

PRESENTATION BY THE YOUTH CLIMATE ACTION BOARD

CONSENT AGENDA

5. Capital Projects
CONSIDERATION OF APPROVAL OF PROFESSIONAL SERVICES CONTRACTS FOR ONCALL RIGHT-OF-WAY SERVICES WITH CMD WEST- MAVERICK ALLIANCE COMPANY, INTERWEST CONSULTING GROUP, INC., AND MONUMENT ROW, INC.

Objective: The objective of this report is to provide the necessary information to the City Council for consideration of approval of three on-call contracts with CMD West-Maverick Alliance Company, lnterwest Consulting Group Inc., and Monument ROW, Inc. for professional right-of-way acquisition services for City projects.

Recommendation: Staff respectfully recommends that the City Council: 1) Approve the proposed professional services contracts with CMD West-Maverick Alliance Company, lnterwest Consulting Group, Inc., and Monument ROW, Inc. for on-call professional right of way services for City projects; 2) Delegate authority to the City Manager or his designee, to execute the contracts substantially in the form attached; 3) Authorize the City manager to issue notices to proceed, approve minor amendments to the Scope of Services and execute non-substantive changes and modifications, with approval from the City Attorney; 4) Authorize the City Manager or designee to execute amendments or change orders and adjust compensation within the Council-approved budget; and 5) Authorize the City Manager or designee to execute amendments to extend the term of the contract and adjust compensation within the limits of the Council-approved budget.

6. Capital Projects
CONSIDERATION OF ADOPTION OF RESOLUTION 25-75 REGARDING THE EMERGENCY

CONTRACT AND AWARD OF A PROFESSIONAL SERVICES CONTRACT WITH ACCO ENGINEERED SYSTEMS, INC. FOR THE COMMUNITY CENTER HVAC PROJECT (CIP 52083) Objective: The objective of this report is to provide the City Council with sufficient information to adopt Resolution 25-75 regarding the Emergency Contract and award the Emergency Contract with ACCO Engineered Systems, Inc. for the Community Center HVAC System Repair Project occurring at the Community Center located at 1075 West Capitol Avenue. 2 Recommendation: Staff respectfully recommends that the City Council: 1) Find that Community Center HVAC Repair project is exempt from CEQA analysis under CEQA Guidelines 15269.

According to the CEQA Guidelines, an emergency includes emergency repairs to public or privately owned service facilities necessary to maintain service essential to the public health, safety, or welfare; 2) Adopt, by a minimum four-fifths vote of the Council, Resolution 25-75, regarding the Emergency Contract with ACCO Engineered Systems, Inc. for the Community Center HVAC Repair Project; 3) Approve the contract with ACCO Engineered Systems, Inc. to provide emergency HVAC repair services at the West Sacramento Community Center; 4) Authorize the City Manager or designee to execute an emergency contract for services in an amount not to exceed $35,099 with approval from the City Attorney; 5) Authorize the City Manager or designee to execute amendments or change orders on the contract; 6) Authorize the City Manager or designee to execute non-substantive changes and modifications, with approval from the City Attorney; and 7) Authorize the City Manager or designee to extend the contract term and adjust compensation, within the limits of the Council-approved budget.

7. Capital Projects
CONSIDERATION OF ADOPTION OF RESOLUTION 25-74 REGARDING THE EMERGENCY

CONTRACT AND AWARD OF A CONSTRUCTION CONTRACT WITH SUBZERO HVAC

SERVICES FOR THE POLICE DEPARTMENT HVAC EMERGENCY INSTALLATION PROJECT (CIP 50004)
Objective: The objective of this report is to provide the City Council with sufficient information to adopt Resolution 25-74 regarding the Emergency Contract and award a Construction Contract with SubZero HVAC Services for the Police Department HVAC Emergency Installation Project occurring at the Police Department located at 550 Jefferson Blvd.

Recommendation: Staff respectfully recommends that the City Council:1) Find that Police Department HVAC Emergency Installation project is exempt from CEQA analysis under CEQA Guidelines 15269. According to the CEQA Guidelines, an emergency includes emergency repairs to public or privately owned service facilities necessary to maintain service essential to the public health, safety, or welfare; 2) Adopt, by a minimum four-fifths vote of the Council, Resolution 25- 74, regarding the Emergency Contract with SubZero HVAC Services for the Police Department HVAC Emergency Installation Project; 3) Approve the contract with Subzero HVAC Services to provide HVAC installation services at the City of West Sacramento Police Department; 4) Authorize the City Manager or designee to execute an emergency contract for services in an amount not to exceed $18.653.00 with approval from the City Attorney; 5) Authorize the City Manager or his designee to execute amendments or change orders up to 10-15% of the contract; 6) Authorize the City Manager or designee to execute non-substantive changes and modifications, with approval from the City Attorney; and 7) Authorize the City Manager or designee to extend the contract term and adjust compensation, within the limits of the Council-approved budget.

8. Capital Projects
CONSIDERATION OF APPROVAL OF CONTRACT AMENDMENT NO. 5 WITH CONSOR NORTH AMERICA, INC. FOR THE SYCAMORE TRAIL EXTENSION PHASE II PROJECT (CIP 14021) Objective: The objective of this report is to provide the City Council with sufficient information to approve Contract Amendment No. 5 of the professional services contract with Consor North 3 America, Inc. (Consor) for construction management services for the Sycamore Trail Extension Phase II Project (CIP 14021).

Recommendation: Staff respectfully recommends that the City Council: 1) Approve and authorize the City Manager, or his designee, to execute Amendment No. 5 to the construction management contract with Consor in the amount of $250,000 for the Sycamore Trail Extension Phase II Project; 2) Authorize the City Manager or his designee to execute amendments or change orders up to 10% of the contract amendment amount ($25,000); 3) Authorize the City Manager to execute nonsubstantive changes or modifications, with approval from the City Attorney; and 4) Authorize the City Manager or his designee to execute amendments to further extend the term of the contract, if necessary.

9. Capital Projects
CONSIDERATION OF ADOPTION OF RESOLUTION 25-66 ESTABLISHING A LIST OF FISCAL YEAR 2025/26 PROJECTS FUNDED BY SENATE BILL 1 (SB1): THE ROAD REPAIR AND

ACCOUNTABILITY ACT
Objective: The objective of this report is to provide sufficient information to the City Council for it to adopt Resolution 25-66 establishing the Fiscal Year (FY) 2025/26 list of projects to be funded with the State Road Maintenance and Rehabilitation Account (RMRA/SB1) revenues and authorizing staff submission of the list to the California Transportation Commission (CTC).

Recommendation: Staff respectfully recommends that the City Council adopt Resolution 25-66 establishing and approving the list of FY 2025/26 projects to be funded with the State Road Maintenance and Rehabilitation Account (RMRA/SB1) revenues and authorize staff to submit the list to the State of California Transportation Commission (CTC).

10. Capital Projects
CONSIDERATION OF RESOLUTION 25-64 CONSENTING TO THE WITHDRAWAL OF RECLAMATION DISTRICT 537 FROM THE WEST SACRAMENTO AREA FLOOD CONTROL

AGENCY JOINT POWERS AUTHORITY
Objective: The purpose of this report is to consider resolution 25-64, consenting to the withdrawal of Reclamation District 537 (RD 537) from the West Sacramento Area Flood Control Agency (WSAFCA/Agency) joint powers agreement.

Recommendation: Staff respectfully recommends that the City Council approve Resolution 25-64, authorizing the withdrawal of Reclamation District 537 (RD 537) from the WSAFCA Joint Powers Agreement.

11. Capital Projects
CONSIDERATION OF APPROVAL OF RESOLUTION 25-70 SUPPORTING AN ADDENDUM TO

THE SOUTHPORT SACRAMENTO RIVER EARLY IMPLEMENTATION PROJECT FINAL

ENVIRONMENTAL IMPACT REPORT FOR THE SOUTHPORT LEVEE RECREATION TRAIL PROJECT (CIP 62147)
4 Objective: To consider adoption of Resolution 25-70 supporting an Addendum to the Southport Sacramento River Early Implementation Project (SSREIP) Final Environmental Impact Report (EIR) (SCH No. 2011082069) to include the Southport Levee Recreation Trail Project (CIP 62147).

Recommendation: Staff respectfully recommends that the City Council: 1) Adopt Resolution 25- 70, approving an Addendum to the Southport Sacramento River Early Implementation Project Final Environmental Impact Report (SCH No. 2011082069) for the Southport Levee Recreation Trail Project (CIP 62147); 2) Approve the Southport Levee Recreation Trail Project (CIP 62147); and 3) Authorize the City Manager or designee to file a Notice of Determination in accordance with CEQA.

12. Capital Projects

CONSIDERATION OF APPROVAL OF THE PROJECT PLANS AND SPECIFICATIONS AND AWARD OF A CONSTRUCTION CONTRACT TO VSS INTERNATIONAL, INC. FOR THE 2025 PAVEMENT PRESERVATION PROJECT (CIP 17029)
Objective: The objective of this report is to provide the City Council with sufficient information to consider approval of the plans and specifications; and award of a construction contract to the lowest responsive, responsible bidder VSS International, Inc. for the 2025 Pavement Preservation Project (CIP 17029).

Recommendation: Staff respectfully recommends that the City Council: 1) Find that a Class 1 exemption under California Code of Regulations Title 14, Division 6, Chapter 3, Article 19, Section 15301 is the appropriate level of environmental review for CEQA for the construction of the 2025 Pavement Preservation Project; 2) Approve the Project Plans and Specifications for the 2025 Pavement Preservation Project (CIP 17029); 3) Award a construction contract to the lowest responsive, responsible bidder, VSS International, Inc.; 4) Delegate Authority to the City Manager, or his designee to execute a construction contract with VSS International, Inc. for an amount not to exceed $2,238,850; 5) Authorize the City Manager or his designee to execute non-substantive changes or modifications, amendments, change orders, agreements, and purchases up to 20% of the construction contract ($447,770) with approval from the City Attorney; and 6) Authorize the City Manager, or his designee, to extend the term of the construction contract with VSS International, Inc., if necessary.

13. Community Development
CONSIDERATION OF RESOLUTION 25-51 APPROVING THE FINAL MAP, SUBDIVISION

IMPROVEMENT AGREEMENT AND DEVELOPMENT REIMBURSEMENT AGREEMENT FOR SUBDIVISION 5142, NEWPORT ESTATES UNIT 13
Objective: This item seeks City Council adoption of Resolution 25-51 approving the Final Map for Newport Estates Unit 13, Subdivision 5142 (Final Map), and Council approval of the associated Subdivision Improvement Agreement and Development Reimbursement Agreement.

Recommendation: Staff respectfully recommends that the City Council: 1) Adopt Resolution 25-51 (Attachment 1), approving the Final Map for Newport Estates Unit 13, Subdivision 5142; 2) Approve the associated Subdivision Improvement Agreement; 3) Approve a Development Reimbursement Agreement; and 4) Authorize the City Manager or designee to execute all agreements listed in this agenda report.
5 14. Finance
CONSIDERATION OF RESOLUTION 25-60 AUTHORIZING THE COLLECTION OF SPECIAL TAX

ON THE SECURED TAX ROLL IN THE SAME MANNER AS THE ORDINARY AD VALOREM

PROPERTY TAXES IN ORDER TO PAY FOR CERTAIN MAINTENANCE SERVICES Objective: The purpose of this action is to collect special tax to pay for certain existing Community Facility District (CFD) maintenance services and to have these taxes placed on the Yolo County secured property tax bill.

Recommendation: Staff respectfully recommends that the City Council adopt Resolution 25-60 authorizing the collection of special tax to pay for certain Community Facility District services on the secured tax roll in the same manner as the ordinary ad valorem property taxes.

15. Finance
CONSIDERATION OF RESOLUTION 25-61 AUTHORIZING THE COLLECTION OF SPECIAL TAX

ON THE SECURED ROLL IN THE SAME MANNER AS THE ORDINARY AD VALOREM

PROPERTY TAXES FOR EXISTING COMMUNITY FACILITY DISTRICTS FOR AUTHORIZED

CAPITAL FACILITY CONSTRUCTION PURPOSES
Objective: The purpose of this action is to collect a special tax associated with Community Facility Districts (CFDs) previously established by the City to fund capital improvements and make debt service payments on outstanding bond debt, and to have these taxes placed on the Yolo County secured property tax bill.

Recommendation: Staff respectfully recommends that the City Council adopt Resolution 25-61 authorizing the collection of a special tax and to place these taxes on the secured tax roll to be collected in the same manner as the ordinary ad valorem property taxes. Furthermore, the actions recognize that the collection of taxes will be used to pay outstanding bond debt and other purposes previously authorized by the City.

16. Finance
CONSIDERATION OF THE TREASURER’S QUARTERLY FINANCIAL REPORT ON THE CITY’S INVESTMENT PORTFOLIO FOR THE PERIOD ENDING MARCH 31, 2025 Objective: The purpose of this report is to provide the City Council with the treasurer’s quarterly report on the City’s investment portfolio for the quarter ending March 31, 2025 as outlined by the Government Code 53646(b)(1).

Recommendation: Staff respectfully recommends that the City Council receive and file the Treasurer’s Quarterly Financial Report on the City’s investment portfolio for the period ending March 31, 2025.

17. Public Works

CONSIDERATION OF AWARD OF A CONTRACT FOR SERVICES WITH PRIDE INDUSTRIES

ONE FOR JANITORIAL SERVICES AT CITY FACILITIES
6 Objective: The purpose of this report is to provide the City Council with sufficient information to consider for approval a professional services contract with PRIDE Industries One to provide janitorial and cleaning services at City facilities.

Recommendation: Staff respectfully recommends that the City Council: 1) Award a contract for janitorial and cleaning services at City facilities to PRIDE Industries One; 2) Authorize the City Manager or his designee to execute non-substantive changes or modifications to the Contract for Services with approval from the City Attorney; 3) Authorize the City Manager or his designee to execute amendments or change orders up to 10% of the contract amount; and 4) Authorize the City Manager or his designee to execute amendments to extend the term of the contract.

18. City Manager's Office

CONSIDERATION OF APPROVAL OF THE UPDATED AGE-FRIENDLY ACTION PLAN Objective: The purpose of this report is to request Council consideration and approval of the updated Age-Friendly Action Plan (the Plan).

Recommendation: Staff respectfully recommends that the City Council approve the updated AgeFriendly Action Plan in substantially the form shown in Attachment 1.

19. City Manager's Office

WEST SACRAMENTO FOUNDATION COLLABORATION WITH CITY OF WEST SACRAMENTO

PROGRAMS SERVING CHILDREN AND YOUTH
Objective: Staff of West Sacramento Home Run, Parks and Recreation, and potentially other Departments are seeking approval to collaborate with West Sacramento Foundation, a California nonprofit public benefit corporation and 501(c)(3) organization, to provide support necessary to raise funds for the expansion and improvement of programs serving children, youth and their families in our city.

Recommendation: Staff respectfully recommends City Council approve the collaboration with the West Sacramento Foundation, and direct staff to provide services necessary to expand the impact of programs serving children and youth in our city.

20. City Manager's Office

CONSIDERATION OF ADOPTION OF THE TOTAL TENTATIVE AGREEMENT ON ECONOMIC

TERMS FOR THE SUCCESSOR MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF WEST SACRAMENTO AND THE WEST SACRAMENTO FIREFIGHTER’S ASSOCIATION AND ADOPTION OF RESOLUTION 25-73 APPROVING AMENDMENT TO THE BUDGET FOR FISCAL YEAR 2025/26
Objective: The purpose of this report is to seek City Council consideration of approval of a total tentative agreement on terms for a three-year successor Memorandum of Understanding (MOU) between the City of West Sacramento and the West Sacramento Firefighter’s Association (FFA) and adoption of Resolution 25-73 approving related budget adjustments. 7 Recommendation: Staff respectfully recommends that the City Council: (1) Approve the total tentative agreement on terms for a successor Memorandum of Understanding between the City of West Sacramento and the West Sacramento Firefighter’s Association effective July 1, 2025 through June 30, 2028; (2) Adopt Resolution 25-73 approving amendments to the budget for Fiscal Year 2025/26 to fund the proposed salary and benefit changes; and (3) Approve the updated Benefits Summary for the FFA.

PUBLIC HEARINGS

21. Community Development
PUBLIC HEARING REGARDING AN APPEAL TO PROPOSED TENTATIVE PARCEL MAP NO. 5247 AT 3071 DAVIS ROAD
Objective: The purpose of this item is to facilitate the City Council’s continuation of the appeal of Tentative Parcel Map (TPM) No. 5247.

Recommendation: Staff respectfully recommends that the City Council: 1) Open the public hearing; and 2) Continue the appeal of TPM No. 5247 to a date uncertain, but no less than 30 days after a request to set a hearing date is received.

22. Economic Development & Housing
PUBLIC HEARING TO CONSIDER RESOLUTION 25-67 ADOPTING THE 2025-2026 ANNUAL

ACTION PLAN FOR THE COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM Objective: The objective of this report is to provide the Council with information necessary to conduct a public hearing to receive comments and adopt the 2025-2026 Annual Action Plan for the use of federal Community Development Block Grant (CDBG) funding.

Recommendation: Staff respectfully recommends that the City Council conduct a public hearing and, upon closing the hearing, approve Resolution 25-67 (Attachment 1) adopting the 2025-2026 Annual Action Plan (Attachment 2) for the use of federal CDBG funding.

23. Finance
PUBLIC HEARING AND CONSIDERATION OF RESOLUTION 25-59 CONFIRMING THE

DIAGRAM AND ASSESSMENT AND ORDERING IMPROVEMENTS FOR THE STORM DRAIN MAINTENANCE DISTRICT NO. 1 (RALEY’S LANDING)
Objective: State law provides for an annual proceeding prior to levying an ongoing assessment.

The recommended action is a key step in this proceeding leading to placement of the levy for the Storm Drain Maintenance District No. 1 on the 2025-2026 tax roll. Because staff is not proposing an increase in assessments, this action does not trigger voter approval under Proposition 218.

Recommendation: Staff respectfully recommends that the City Council conduct a public hearing; approve the Storm Drain District No. 1 Report for Fiscal Year 2025-2026 with budget and fee 8 schedule; and adopt Resolution confirming the diagram and assessment and ordering improvements (maintenance) to be made for the Storm Drain Maintenance District No. 1.

24. Finance
PUBLIC HEARING AND CONSIDERATION OF RESOLUTION 25-58 CONFIRMING THE

DIAGRAM AND ASSESSMENT AND ORDERING IMPROVEMENTS (MAINTENANCE) TO BE MADE FOR THE LANDSCAPING AND LIGHTING DISTRICT NO. 1
Objective: State law provides for an annual proceeding prior to levying an ongoing assessment.

The recommended action is a key step in this proceeding leading to placement of the levy for the Landscaping and Lighting District No. 1 on the 2025-26 tax roll. Because staff is not proposing an increase in assessments, this action does not trigger voter approval under Proposition 218.

Recommendation: Staff respectfully recommends that the City Council: 1) Conduct a public hearing; 2) Approve the Landscaping & Lighting District No. 1 Report for 2025-2026 with budget and fee schedule; and 3) Adopt Resolution 25-58 confirming diagram and assessment, and ordering improvements (maintenance) to be made for the Landscaping and Lighting District No. 1.

REGULAR AGENDA

25. City Manager's Office

CONSIDERATION OF AMENDED AND RESTATED EMPLOYMENT AGREEMENT FOR CITY

MANAGER
Objective: The purpose of this report is to seek City Council approval of the Amended and Restated City Manager Employment Agreement.

Recommendation: Staff respectfully recommends that the City Council approve the June 18, 2025 Amended and Restated City Manager Employment Agreement between the City Council and Aaron Laurel for the position of City Manager.

26. Finance
CONSIDERATION OF RESOLUTION 25-71 ADOPTING THE OPERATIONS & MAINTENANCE (O&M) AND CAPITAL IMPROVEMENT PROGRAM (CIP) BUDGETS FOR FISCAL YEAR 2025/26 Objective: The purpose of this report is to present and seek approval of the proposed Operations and Maintenance (O&M) and Capital Improvement Program (CIP) budget for fiscal year 2025/26.

Recommendation: Staff respectfully recommends that the City Council: (1) Adopt Resolution 25- 71 approving the Operations & Maintenance and Capital Improvement Program (CIP) midyear budget for FY 2025/26; (2) Approve the amended Authorized Positions List (APL); and (3) Approve the amended Salary Schedule.

GENERAL ADMINISTRATION FUNCTION – PART II
9 27. COUNCIL COMMUNICATIONS / ASSIGNMENTS
Bikeshare Policy Steering Committee --------------------------------------------Guerrero, Alternate - Early City/County 2x2 ----------------------------------------------------Guerrero/Orozco, Alternate – Sulpizio Hull City/School 2x2 ------------------------------------------------------Guerrero/Sulpizio Hull, Alternate - Alcala Executive Commission to Address Homelessness --------------------Sulpizio Hull, Alternate - Orozco EIFD Public Financing Authority-----------------------------------------------Guerrero, Alcala, Sulpizio Hull League of California Cities --------------------------------------------------- Alcala, Alternate – Sulpizio Hull Local Agency Formation Commission ---------------------------------------------------------------------- Alcala Port District Commission ---------------------------------------------------------Guerrero, Early, Sulpizio Hull Remote Access Network ------------------------------------------------------------------------------------Guerrero River City Regional Stadium Financing Authority------------------------------------------Guerrero, Orozco Sacramento Area Council of Governments (SACOG) ------------------------Early; Alternate - Guerrero Sacramento Regional County Sanitation District Board --------------Orozco; Alternate - Sulpizio Hull West Sacramento Area Flood Control Agency JPA ----------------------------Alcala; Alternate - Orozco Yolo Animal Servies Planning Agency JPA----------------------------Guerrero; Alternate – Sulpizio Hull Yolo County Housing Authority-------------------------------------------------Early, Alternate - Sulpizio Hull Yolo Transportation District -----------------------------------------------------Early, Alternate - Sulpizio Hull Yolo Habitat Conservancy ------------------------------------------------------------------------------Sulpizio Hull Yolo-Solano Air Quality Management District ----------------------------Alcala; Alternate – Sulpizio Hull Yolo Subbasin Sustainable Groundwater Agency-------------------------Sulpizio Hull; Alternate - Early

COUNCIL INTERMEDIARY REPRESENTATIVES
Delta Protection Commission -------------------------------------------------------Vacant; Alternate - Vacant New Hope Community Development Corporation---------------------------------Early; Alternate - Alcala Yolo County Consolidated Redevelopment Successor Agency Oversight Board--------Sulpizio Hull

28. PART II
A. Council Calendar
B. City Manager Report
C. City Attorney Report
D. Staff Direction from City Council Members
E. Future Agenda Item Requests by Council
F. Adjourn
I, Jennifer Cusmir, City Clerk, declare under penalty of perjury that the foregoing agenda for the June 18, 2025 regular and closed session meetings of the West Sacramento City Council, Redevelopment Successor Agency and Financing Authority was posted June 13, 2025 at the rear entrance at City Hall, 1110 West Capitol Avenue, West Sacramento, CA and was available for public review. __________________________________________
Jennifer Cusmir, City Clerk
NOTE: If you challenge the nature of a proposed action in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the City Council at, or prior to, the public hearing.

The agenda and agenda reports are also available on the City’s website at www.cityofwestsacramento.org City Council meetings are broadcast live on Wave Cable Channel 20 and rerun the next day at 12:00 PM and the following Saturday at 6:00 PM.

All public materials related to an item on this agenda submitted to the City Council after distribution of the agenda packet are also made available for public inspection on the City’s website at:
www.cityofwestsacramento.org. Any document provided at the meeting by staff or by the public will be provided by 10 If you need assistance to participate in this meeting, including translation support, please contact the City Clerk’s Office at 916-617-4500 or [email protected]. Notifying the City Clerk’s Office at least 72 hours prior to the meeting will assist staff in assuring reasonable arrangements can be made to provide accessibility to the meeting. Assisted listening devices are available at this meeting.

Si necesita ayuda para participar en esta reunión o servicios de traducción, comuníquese con la Oficina del Secretario Municipal al 916-617-4500 o [email protected]. Notificar a la Oficina del Secretario Municipal al menos 72 horas antes de la reunión ayudará al personal a garantizar que se puedan hacer arreglos razonables para proporcionar accesibilidad a la reunión.

Los dispositivos de escucha asistida están disponibles en esta reunión. 11 CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 2
SUBJECT:

PROCLAMATION OF THE CITY COUNCIL RECOGNIZING TOM RAMOS FOR HIS

LONGTIME SERVICE ON THE WEST SACRAMENTO AREA FLOOD CONTROL

AGENCY BOARD
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ X ] Staff Paul Hosley, Public Information Officer City Manager’s Office
[ ] Other
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
The objective of this item is to recognize Tom Ramos for his years of public service on the West Sacramento Area Flood Control Agency (WSAFCA) Board and his contributions to the City's flood protection strategy.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council adopt the attached proclamation recognizing Tom Ramos for his service on the WSAFCA Board and his commitment to advancing flood protection in West Sacramento.

BACKGROUND
Tom Ramos is a native of West Sacramento and a graduate of Our Lady of Grace Parish School and James Marshall High School. He earned a Bachelor of Science degree in Civil Engineering from the University of Nevada and owned and operated Ram Auto Parts & Machine Shop in West Sacramento from 1981 to 2006. He has served as a Trustee for Reclamation District 537 since 2007 and joined the WSAFCA Board in 2008, becoming Chair in 2017. He has also represented the agency on several regional flood planning boards.

ANALYSIS
Adoption of this proclamation recognizes Tom Ramos for his long-standing dedication to flood protection measures and years of service to the City of West Sacramento. As a WSAFCA Board member since 2008 and Chair since 2017, he helped lead at least six major Early Implementation Projects between 2008 and 2024, including the I Street Bridge, The Rivers, CHP Academy, and multiple Southport improvements.

In 2015, Mr. Ramos presented the West Sacramento General Reevaluation Report to the U.S. Army Corps of Engineers’ Civil Works Review Board, where it was approved. He also participated in at least five Cap-to-Cap trips to Washington, D.C., advocating for WRDA authorization and a new start designation, which was approved in the 2022 federal budget. Mr. Ramos has consistently demonstrated strong fiscal stewardship and a commitment to public safety, supporting the responsible use of flood assessment funds to protect the community.

Environmental Considerations
N/A
Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
N/A
Coordination and Review
N/A
Budget/Cost Impact
N/A

ATTACHMENT
Proclamation Recognizing Tom Ramos for His Longtime Service on the WSAFCA Board 12 PROCLAMATION

OF THE WEST SACRAMENTO CITY COUNCIL

RECOGNIZING TOM RAMOS FOR HIS LONGTIME SERVICE ON

THE WEST SACRAMENTO AREA FLOOD CONTROL AGENCY BOARD
WHEREAS, Tom Ramos is a native of West Sacramento and a graduate of Our Lady of Grace Parish School and James Marshall High School; and WHEREAS, he earned a Bachelor of Science degree in Civil Engineering from the University of Nevada and was the owner and operator of Ram Auto Parts & Machine Shop in West Sacramento for 25 years, from 1981 to 2006; and
WHEREAS, he has served as a Trustee for Reclamation District 537 (RD537) since 2007; and
WHEREAS, he has served on the West Sacramento Area Flood Control Agency (WSAFCA) Board since 2008 and has served as Chair of the Board since 2017, representing WSAFCA on several regional flood planning boards; and
WHEREAS, he encouraged and approved WSAFCA’s Early Implementation Projects, including I Street Bridge (2008), The Rivers (2011), CHP Academy (2011), Rivers Project (2011), Southport Sacramento River Phase I & II ( 2024); and WHEREAS, he attended and presented the West Sacramento General Reevaluation Report before the Civil Works Review Board at U.S. Army Corps of Engineers headquarters in Washington, D.C., in December 2015, where it received approval; and WHEREAS, he participated in multiple Cap-to-Cap trips to Washington, D.C., advocating for the West Sacramento project to receive authorization under the Water Resources Development Act and to obtain a new start designation for full federal participation; and WHEREAS, he approved the construction of the Southport Levee Improvement Project in 2017; and
WHEREAS, he remained committed to the project and witnessed the federal new start designation being approved in the 2022 budget; and
WHEREAS, he has consistently served as an ardent steward of WSAFCA’s budget and has supported the use of flood assessment funds for critical flood protection projects.

NOW, THEREFORE, BE IT PROCLAIMED that the West Sacramento City Council hereby recognizes Tom Ramos for his longstanding commitment to public service and his dedication to advancing flood protection for the residents and property owners of West Sacramento.

PROCLAIMED this 18th day of June, 2025.

ATTEST:

Martha Guerrero, Mayor Jennifer Cusmir, City Clerk
13 CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 3
SUBJECT:

PRESENTATION OF PROCLAMATION RECOGNIZING JUNE 19TH AS

JUNETEENTH NATIONAL FREEDOM DAY
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ X ] Staff Paul Hosley, Public Information Officer City Manager’s Office
[ ] Other
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
The objective of this report is to officially recognize June 19th as Juneteenth National Freedom Day in the City of West Sacramento, promoting awareness and celebration of this significant historical event, and to encourage community engagement.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council adopt the proclamation recognizing June 19 as Juneteenth National Freedom Day in the City of West Sacramento.

BACKGROUND
Juneteenth, also known as Juneteenth National Freedom Day or Emancipation Day, commemorates June 19, 1865, when Union General Gordon Granger announced the end of slavery in Galveston, Texas. This announcement came more than two years after President Abraham Lincoln's Emancipation Proclamation, symbolizing a pivotal moment in American history when freedom was finally extended to all enslaved African Americans. Juneteenth has evolved to become a day of reflection, education, and celebration of African American history and culture. It serves as a reminder of the struggle for racial equity and justice, highlighting the progress made and the ongoing efforts required to achieve true equality in our society.

ANALYSIS
Recognizing Juneteenth as a citywide observance each year during the City’s annual Juneteenth Celebration at Bridgeway Lakes Park aligns with West Sacramento's commitment to diversity, equity, and inclusion. The proclamation underscores the City's dedication to honoring the rights and dignity of every resident and acknowledges the historical adversities faced by African Americans. By promoting Juneteenth, the City provides a platform for education and discourse on racial issues. The celebration at the park on Friday, June 13, 2025 was an opportunity for residents to engage in activities that celebrate African American culture and history while promoting unity within the community.

Environmental Considerations
N/A
Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
N/A
Coordination and Review
N/A
Budget/Cost Impact
N/A

ATTACHMENT
Proclamation
14 PROCLAMATION OF THE WEST SACRAMENTO CITY COUNCIL
RECOGNIZING JUNE 19TH AS

JUNETEENTH NATIONAL FREEDOM DAY
WHEREAS, the City of West Sacramento acknowledges the significance of commemorating the liberation of enslaved African Americans and celebrating their invaluable contributions to our nation; and
WHEREAS, Juneteenth, also known as Juneteenth National Freedom Day or Emancipation Day, marks June 19, 1865, when Union General Gordon Granger proclaimed the end of slavery in Galveston, Texas, aligning with President Abraham Lincoln's Emancipation Proclamation from over two years prior; and
WHEREAS, Juneteenth symbolizes a key moment in American history, marking the longawaited attainment of freedom and the ongoing struggle for racial equity and justice; and WHEREAS, Juneteenth festivities offer a platform for contemplation, education, and discourse on the historical adversities faced by African Americans and the ongoing efforts for equality, inclusivity, and social justice; and
WHEREAS, Juneteenth serves as an important reminder of the strides our nation has made and the continued work that still lies ahead in achieving equality; and WHEREAS, the City of West Sacramento is committed to fostering a diverse, fair, and inclusive community, dedicated to upholding and honoring the rights and dignity of every resident; and
WHEREAS, the City of West Sacramento recognized Juneteenth by holding its annual Juneteenth Celebration on Friday, June 13, 2025 at Bridgeway Lakes Park, providing an opportunity for all residents to participate in activities that foster cultural empathy, racial harmony, and community unity.

NOW, THEREFORE, BE IT HEREBY PROCLAIMED by the West Sacramento City Council that June 19th be recognized as Juneteenth National Freedom Day in the City of West Sacramento, urging all residents to commemorate this day and engage in events promoting the emancipation of enslaved African Americans and promoting the values of equality, justice, and diversity.

PROCLAIMED this 18th day of June, 2025.

ATTEST:

Martha Guerrero, Mayor Jennifer Cusmir, City Clerk
15 ORAL PRESENTATION ONLY

THERE WILL BE NO WRITTEN REPORT

FOR THIS ITEM
ITEM #
16 CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 5
SUBJECT:

CONSIDERATION OF APPROVAL OF PROFESSIONAL SERVICES CONTRACTS FOR

ON-CALL RIGHT-OF-WAY SERVICES WITH CMD WEST- MAVERICK ALLIANCE COMPANY, INTERWEST CONSULTING GROUP, INC., AND MONUMENT ROW, INC.

INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Dagoberto Fierros, Senior Analyst
Fred Arnold, Senior Project Manager
Capital Project Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action

OBJECTIVE
The objective of this report is to provide the necessary information to the City Council for consideration of approval of three on-call contracts with CMD West-Maverick Alliance Company, lnterwest Consulting Group Inc., and Monument ROW, Inc. for professional right-of-way acquisition services for City projects.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Approve the proposed professional services contracts with CMD West-Maverick Alliance Company, lnterwest Consulting Group, Inc., and Monument ROW, Inc. for on-call professional right of way services for City projects;
2) Delegate authority to the City Manager or his designee, to execute the contracts substantially in the form attached;
3) Authorize the City manager to issue notices to proceed, approve minor amendments to the Scope of Services and execute non-substantive changes and modifications, with approval from the City Attorney; 4) Authorize the City Manager or designee to execute amendments or change orders and adjust compensation within the Council-approved budget; and
5) Authorize the City Manager or designee to execute amendments to extend the term of the contract and adjust compensation within the limits of the Council-approved budget.

BACKGROUND
While implementing City infrastructure projects and other initiatives, staff engages in real property transactions which require professional right-of-way acquisition services. Property transactions require a vast array of services including, but not limited to: acquisition and relocation assistance, appraisals, appraisal reviews, Phase I and Phase 2 environmental assessments, escrow and title services, and assorted real property permits.

The Federal Uniform Acquisition, Relocation Assistance Advisory Services Act of 1970 (as amended), CFR 49, Part 24 and the State of California, Caltrans Right-of-Way Manual, defines the procedures required for performing real property acquisition activities. The City, as a local agency, is responsible for performing real property activities in accordance with the Federal and State policy guidelines and procedures.

To obtain the required professional services, on March 11, 2025, the City released a Request for Qualifications (25-010-RFQ) for On-Call Right-of-Way Services. On April 8, 2025, the RFQ's submittal deadline, a total of five Statements of Qualifications (SOQs) were received. SOQs were received from Bender Rosenthal, Inc.; CMD West-Maverick Alliance Company; lnterwest Consulting Group, Inc.; Monument ROW Inc.; and Paragon Partners Consultants, Inc. Staff planned to award up to three contracts total, each with a total not-to-exceed (NTE) limit of $100,000 to accommodate the current project needs within the City. Staff requested rates as part of the RFQ process and used a best value approach in evaluating the proposed rates in relation to the customer service and technical approach proposed.

The evaluation team was staffed with subject matter experts and managers who have procurement knowledge and experience with the products and services being procured and selected the firms providing the best value 17 On-Call Contracts for Right-Of-Way Services
June 18, 2025

Page 2 ends

for the City. After evaluation and scoring, the evaluation team selected the top three rated firms to enter into individual contracts with the City.

ANALYSIS
Staff is requesting the Council’s approval of three on-call contracts with the three top rated firms: CMD WestMaverick Alliance Company, lnterwest Consulting Group, Inc., and Monument ROW, Inc. Each of these contracts has a three-year term with a not-to-exceed (NTE) amount of $100,000. Based on the "as-needed" form of an oncall contract, the exact scope of work and schedule are not identified in the attached contracts; instead, Notices to Proceed (NTP) are issued for each service requested, outlining the exact scope of work and schedule based on a project-specific proposal from the chosen firm.

Awarding up to three contracts will provide staff with timely access to services without relying on one firm’s availability, which can vary greatly depending on their workload. Additionally, each of the three firms provides similar approaches to delivering services. Having an array of services available from three firms will provide staff the ability to ensure project timelines are adequately met.

Environmental Considerations
This action is not a project that is subject to CEQA because it is not an activity that may cause either a direct or reasonably foreseeable indirect physical change in the environment. (Pub. Resources Code, § 21065; CEQA Guidelines§§ 15060(c), 15378(a).)
Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
The Council's primary alternatives include:
1) Defer approval and request staff return to the Council with additional information at a later date. 2) Choose not to enter into the proposed contracts.
3) Reject the proposed recommended action and direct staff to complete separate solicitations for right of way acquisition services for every project.

Staff does not recommend these alternatives. Delays to essential real-estate transactions will negatively impact current project scheduling.

Coordination and Review
The proposed contracts were reviewed by the City Attorney's Office, the Capital Projects Department, and the Finance Department.

Budget/Cost Impact
Costs for these services are integrated into each CIP project budget or the existing appropriation for the Capital Projects Department professional services budget. There is no new net cost impact of approving the attached Contracts.

ATTACHMENTS

1. CMD West-Maverick Alliance Company - Contract for Services

2. lnterwest Consulting Group, Inc. - Contract for Services

3. Monument ROW, Inc. - Contract for Services
18 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
1 11.4.2024

CONTRACT FOR SERVICES
THIS CONTRACT is made on June 18, 2025, by and between the CITY OF WEST SACRAMENTO (“City”), and CMD West Company (“Consultant”).

WITNESSETH:

WHEREAS, the City desires to retain CMD West Company for right of way acquisition services for existing and future operations & maintenance projects, capital improvement projects, and other citywide projects requiring such services; WHEREAS, the Consultant has presented a proposal for such services to the City, dated April, 8, 2025, (attached hereto as Exhibit “A”) and is duly licensed, qualified and experienced to perform those services;
NOW, THEREFORE, the parties hereto mutually agree as follows:

1. SCOPE OF SERVICES:

A. Consultant shall do all work, attend all meetings, produce all reports and carry out all activities necessary to completion of the services described in Exhibit “A”. This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of conflict between terms contained in these Contract Documents, the more specific term shall control. If any portion of the Contract Documents shall be in conflict with any other portion, provisions contained in the Contract shall govern over conflicting provisions contained in the exhibits to the Contract.

B. Consultant enters into this Contract as an independent contractor and not as an employee of the City. The Consultant shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant are employees, agents, contractors or subcontractors of the Consultant and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, To the greatest extent permitted by law, Consultant and its employees, agents, and subcontractors shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Attachment 1
19 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
2 11.4.2024
C. The Consultant agrees it has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.

2. TERM OF CONTRACT
A. The services of Consultant are to commence upon execution of this Contract by the City, and shall be undertaken and completed per subsequent Notice to Proceeds prescribed by the City. The term of this Contract, subject to termination as set forth in Section 4, shall terminate on June 17, 2028.

B. Consultant’s failure to complete work in accordance with the Schedule of Performance may result in delayed compensation as described in Section 3.

C. The City Manager or his or her designee may, by written instrument signed by the Parties, extend the duration of this Contract for two (2) additional one-year extensions in the manner provided in Section 5, provided that the extension does not require the payment of compensation in excess of the Council approved budget.

3. COMPENSATION:

A. The Consultant shall be paid monthly for the actual fees, costs and expenses for all time and materials required and expended, but in no event shall total compensation exceed One hundred thousand dollars and no cents ($100,000.00), without City’s prior written approval. Consultant's fees shall be as specified in the Schedule of Fees, which is attached hereto an incorporated herein as Exhibit "C".

B. Said amount shall be paid upon submittal of a monthly billing showing completion of the tasks that month. Consultant shall furnish City with invoices for all expenses as well as for all materials authorized by this Contract. The invoices shall be submitted with the monthly billings.

If Consultant’s performance is not in conformity with the Schedule of Performance, payments may be delayed or denied, unless the Consultant’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform with the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.

C. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section 4.

4. TERMINATION:

A. This Contract may be terminated by either party, provided that the other party is given not less than 30 calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.

B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant shall immediately suspend its activities under this Contract. 20 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
3 11.4.2024
C. Notwithstanding any provisions of this Contract, Consultant shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant, and the City may withhold any payments due to Consultant until such time as the exact amount of damages, if any, due the City from Consultant is determined.

D. In the event of termination, the Consultant shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.

5. AMENDMENTS, CHANGES OR MODIFICATIONS:

Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto.

6. EXTENSIONS OF TIME:

Consultant may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Work Program in the manner provided in Section 5.

7. PROPERTY OF CITY:

A. It is mutually agreed that all materials prepared by the Consultant under this Contract shall become the property of the City, and the Consultant shall have no property right therein whatsoever. Immediately upon termination, the City shall be entitled to, and the Consultant shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant in performing this Contract which is not Consultant’s privileged information, as defined by law, or Consultant’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant’s possession.

B. Additionally, it is agreed that the parties intend this to be a contract for services and each considers the products and results of the services to be rendered by Consultant hereunder (the “Work”) to be a work made for hire. Consultant acknowledges and agrees that the Work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of the City.

8. COMPLIANCE WITH ALL LAWS:

A. Consultant shall comply with all applicable laws, ordinances, and codes of federal, State and local governments, and shall commit no trespass on any public or private property in performing any of the work authorized by this Contract.

B. Consultant warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that it has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable it to perform this Contract. 21 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
4 11.4.2024

FOR WORK SUBJECT TO PREVAILING WAGES
C. The work contemplated under this Contract is a public work for the purposes of Labor Code section 1720, and is subject to the payment of prevailing wages. Accordingly, Consultant shall comply with the provisions of Exhibit "D".

9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT:

A. Consultant agrees and represents that it is qualified to properly provide the services set forth in Exhibit “A” in a manner which is consistent with the generally accepted standards of Consultant’s profession.

B. Consultant agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, State and local law in accordance with Section 17A hereof.

C. Consultant shall designate a project manager who at all times shall represent the Consultant before the City on all matters relating to this Contract. The project manager shall continue in such capacity unless and until he or she is removed at the request of the City, is no longer employed by Consultant, or is replaced with the written approval of the City, which approval shall not be unreasonably withheld.

D. Consultant shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant in writing within sixty (60) days of discovery. Should Consultant fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant shall be liable for any expenses thereby incurred.

10. SUBCONTRACTING:

None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant.

11. ASSIGNABILITY:

Consultant shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld.

However, claims for money due or to become due Consultant from the City under this Contract may be assigned to a financial institution, or to a trustee in bankruptcy, without such approval.

Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.

12. INTEREST IN CONTRACT:

Consultant covenants that neither it, nor any of its employees, agents, contractors, subcontractors has any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the performance of its services hereunder. Consultant shall make all disclosures required by the 22 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
5 11.4.2024
City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant in writing that Consultant’s duties under this Contract warrant greater disclosure by Consultant than was originally contemplated. Consultant shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.

13. MATERIALS CONFIDENTIAL:

All of the materials prepared or assembled by Consultant pursuant to performance of this Contract are confidential and Consultant agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.

14. LIABILITY OF CONSULTANT-NEGLIGENCE:

Consultant shall be responsible for performing the work under this Contract in a manner which is consistent with the generally-accepted standards of the Consultant’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant or its employees, agents, contractors or subcontractors.

15. INDEMNITY AND LITIGATION COSTS:

Consultant shall indemnify, defend, and hold harmless the City, its officers, officials, agents, and employees against all claims, damages, demands, liability, costs, losses and expenses, including without limitation court costs and reasonable attorneys’ fees, arising from Consultant's negligent acts or negligent failure to act, errors, omissions or willful misconduct incident to the performance of this Contract except such loss or damage caused by the active negligence, sole negligence, or willful misconduct of the City. The provisions of this paragraph shall survive termination or suspension of this Contract.

16. CONSULTANT TO PROVIDE INSURANCE:

A. Consultant shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract, the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A VII (an NR rating is acceptable for Worker’s Compensation insurance written with the State Compensation Insurance Fund of California).

B. Prior to execution of this Contract and prior to commencement of any work, the Consultant shall furnish the City with certificates of insurance and copies of endorsements providing evidence of coverage for all policies required by the Contract. The Consultant and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant 23 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
6 11.4.2024
or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Approval of the insurance by the City shall not relieve or decrease any liability of Consultant.

1. Worker’s Compensation and Employer’s Liability Insurance a. Worker’s Compensation - Insurance to protect the Consultant, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and Federal statutes and regulations.

The Consultant shall execute a certificate in compliance with Labor Code Section 1861, on the form provided in the Contract Documents.
b. Consultant shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant.

2. Commercial General Liability Insurance
a. The insurance shall be provided on form CG0001, or it’s equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractual liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per occurrence and $2,000,000 general and products/completed operations aggregates. b. The commercial general liability insurance shall also include the following:
i. Endorsement equivalent to CG 2010 0714 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii. Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
iii. Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

3. Commercial Automobile Insurance
24 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
7 11.4.2024
a. The insurance shall include, but shall not be limited to, coverage for claims for bodily injury or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per accident.
b. The commercial automobile insurance shall include the same endorsements required for the commercial general liability policy (see Section

16.B.2.b).

4. Professional Liability. The Consultant and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not be less than $1,000,000 per claim.

C. In addition to any other remedy the City may have, if Consultant fails to maintain the insurance coverage as required in this Section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant under this Contract.

D. No policy required by this Contract shall be suspended, cancelled, terminated by either party, or reduced in coverage or in limits unless Consultant has provided thirty (30) days prior written notice by certified mail, return receipt requested, to the City.

E. Any deductibles or self-insured retentions in excess of $10,000 must be declared to, and approved by, the City.

F. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant under the Contract.

17. MISCELLANEOUS PROVISIONS:

A. Consultant shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work.

B. Consultant shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orientation. 25 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
8 11.4.2024
C. Consultant shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant.

D. This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing.

E. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:

City: Fred Arnold, Senior Program Manager
City of West Sacramento
1110 West Capitol Avenue, 1st Floor
West Sacramento, CA 95691
Office: 916-617-4954
E-Mail: [email protected]

Consultant: Connor McDonald, Principal
CMD West Company
333 University Avenue, Suite 200
Sacramento, CA 95825
[email protected]

F. This Contract shall be interpreted and governed by the laws of the State of California.

G. Any action arising out of this Contract shall be brought and maintained in Yolo County California, regardless of where else venue may lie.

H. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsibility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party.

I. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
[Signatures on following page]
26 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
9 11.4.2024

CITY OF WEST SACRAMENTO
By: __________________________
Amanda Berlin, Assistant City Manager
ATTEST:

By: _______________________
Jennifer Cusmir, City Clerk
APPROVED AS TO FORM:

By: _______________________
Jeffrey Mitchell, City Attorney

CMD WEST COMPANY
By: _________________________
Connor McDonald, Principal
27 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28

EXHIBIT A
Consultant Proposal/Scope of Work
28 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 1 The City of West Sacramento has been a standout example of a vibrant and growing community, and The City’s infrastructure has paved the way for this success. As The City continues to grow, its infrastructure will remain key to its development, and delivering that infrastructure will remain critical. A successful project approach relies on similar ‘project management infrastructure’ – which we at CMD refer to as “The 5 Steps”.

The potential scope of work for the overall on-call effort may include 1. Project Management and Coordination;

2. Appraisals; 3. Appraisal Reviews; 4. Phase 1 and 2 Environmental Site Assessments; 5. Acquisition; 6.

Relocation; and Optional Task(s). This full-service right-of-way effort will require an organized approach for delivery.

Step 1: Defining Success — The technical project approach begins with an understanding of the Client’s definition of success. CMD will discuss Scope, Schedule, Communications Plan, Approach Regarding Key Decisions, Updates, Tracking, and Metrics with The City to develop an understanding of The City’s parameters, and how the Project Owners define the success of this project. This discussion will involve receiving The City’s direction on scheduling milestones and best practices for communication and coordination.

Step 2: Developing The Plan — Based on the guidance of The City, CMD Staff will convert The City’s vision of success into specific milestones, deliverables, and actions. These items will become the CMD-Dashboard for the project. The CMD-Dashboard is a central source of project information that identifies the guideposts of scope, project deadlines, critical path items, offramps, decision points, key parties, communication flow, and key metrics.

The CMD Team will use this information to ensure that at each step of the project, the deliverables, milestones, decisions, and actions are in concert with The City’s vision of success.

Step 3: Communication — Both internal and external communications are critical to the delivery of any project.

The CMD Team maintains up-to-the-minute communication with one another across a variety of platforms, leveraging technology to remain connected, and up-to-date on the status of fellow Team Members. For external communications, the Team will follow the guidelines of the Communications Plan, and ensure that Project Owners and Stakeholders are kept updated in the frequency, and to the degree expected. The objective is to maintain regular, open avenues of communication that add value, and allow for discussion of items in a timely and iterative way, before they become critical and urgent, always working to stay in front of the schedule.

Step 4: Coordination — The CMD Team prides itself on its ability to coordinate, with the Team always striving to be greater than the sum of its parts. This coordination extends beyond the CMD Team to collaboration with other Project Stakeholders — Survey, Engineering, Legal, Environmental. We understand that the successful delivery of any project relies on everyone moving as a team and tracking with one another. The CMD Team will, in accordance with the Communications Plan, ensure that all Stakeholders track together, including the landowners and their representatives.

Step 5: Cost — CMD uses an automated time- and cost-tracking platform to ensure there is a snapshot of the financial status of the project at any given time. Project Leads use this on a weekly, and often more frequent, basis to ensure that costs are on track with deliverables and efforts are in line with earned values.

Bringing It All Together: Tracking and Reporting — While Tracking and Reporting functions are used to provide a review of what was done, they are also a key tool in planning next steps and envisioning what needs to be accomplished. This is only possible if items are tracked and reported in time with the progress of the project — right-of-way schedules demand constant progress be made, and Decision Makers need up-to-date information to give guidance. The CMD Team understands this. Based on the scope of this effort, it’s anticipated that CMD’s customary bi-weekly reporting, coupled with time-critical updates at key milestones, decision points, and events will capture the needs of the project. If, however, a different approach will add value to the process, CMD can nimbly adjust its procedures to meet the needs of The City.

3.4 TECHNICAL PROJECT APPROACH
29 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 2 The CMD West Project Team understands that the delivery of any infrastructure project requires a fully coordinated right-of-way approach, including . Project Management and Coordination; 2. Appraisals; 3.

Appraisal Reviews; 4. Phase 1 and 2 Environmental Site Assessments; 5. Acquisition; 6. Relocation; and Optional Task(s). The CMD West Project Team possesses the skills and experience to ensure the success of any project need that may arise, and has developed a plan of approach to deliver that success.

Task 1: Project Management and Coordination — Project Management requires that all pieces of the right-ofway machine are in motion when needed. Schedule will drive the successful delivery of any effort, and the CMD Team will focus on advancing schedule items that are on the critical path for right-of-way delivery. Many of the activities in the right-of-way schedule can be initiated simultaneously, allowing forward progress in a parallel fashion. In addition to maximizing the available time, CMD will focus its Project Management efforts on right-ofway planning, cost containment, progress reporting, QA/QC, and any needed support to The City, such as attendance at City Council. Project Management will also include preliminary engagement with landowners to accelerate the relationship-building process and prepare the parties for negotiations.

Task 2: Appraisals — CMD will coordinate the valuation process. To accelerate the process, appraisal research can be initiated upon The City’s authorization, even while exhibits are still pending. CMD will serve as the point of contact for the affected property owners, and will coordinate the required notices and meetings with property owners. With The City’s approval, appraisal delivery can be prioritized for longer-lead items, to accelerate the initiation of negotiations, as appraisals of less-long-lead lands are in process. The Appraisal Subconsultant will maintain all needed files and diaries. Title Reports will be ordered immediately upon authorization.

Task 3: Appraisal Reviews — CMD will coordinate the appraisal review process with the Appraisal Review Subconsultant, and ensure that the process is fluid and timely, to avoid any delay to setting of just compensation and initiating negotiations.

Task 4: Phase I and II Environmental Site Assessments — With The City’s authorization, Phase I ESAs can be initiated early in the project process. Accelerating this item in the schedule can maximize resource use, and avoid later schedule compression. With regard to Phase IIs, a right of entry, possession agreement, possession by settlement agreement, or order for possession may be needed for access — this is an item that can be incorporated into early discussions with landowners. The CMD Team will work with the ESA Subconsultant to ensure that this task is planned and scheduled to complete due diligence in coordination with timely land delivery.

Task 5: Acquisition — Many of the preliminary items in the Acquisition effort can be initiated on an accelerated basis. Preliminary engagement can be conducted by the Acquisition Team through the appraisal site visit, contracts can be drafted in anticipation of just compensation approval, and RON documentation can be prepared well ahead of the proceeding. All of these items serve to accelerate this task and protect the project schedule. The CMD Team, with approval of The City, will conduct preliminary engagement with landowners to build pro-active relationships, prepare offer packages in anticipation of just compensation, so that offers can be made immediately upon setting of compensation, prepare RON documents prior to the 45-day negotiation window, consider possession and use and right of entry agreements when appropriate, work towards expeditious negotiations, administrative settlements, non-monetary agreements, and win-win solutions; and always keep the schedule and land delivery date in mind in all activities.

Task 6: Relocation Advisory Assistance Services — Relocation can be a long-lead item. For the benefit of project planning, the project team, and the displacee, it’s necessary to identify any relocation impacts early in the process. CMD’s in-house relocation specialists can identify relocation matters early, and track with the project team to ensure that relocation services dovetail with land delivery and the overall project schedule.

3.4 TECHNICAL PROJECT APPROACH
30 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 3 Tasks — Optional — As Needed:

Task Optional-1 — Appraisal of Furniture, Fixtures, and Equipment — If a review of the proposed acquisition indicates that there may be effects to FF&E, the team will inform The City, and engage the FF&E Subconsultant to ensure that the appropriate valuation can be performed.

Task Optional-2 — Business Goodwill Valuation — If there is the possibility of losses to business goodwill, the CMD Team will engage with the Business Goodwill Valuation Subconsultant.

Task Optional-3 — Asset / Property Management — At times, The City will acquire some, or all, of its needed parcels in advance of construction. With these parcels in City possession during the interim before construction, it may be necessary for The City manage the property. The CMD Team has extensive experience in the management of publicly owned parcels, and can deliver these services as needed.

3.4 TECHNICAL PROJECT APPROACH
31 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28

EXHIBIT B
Schedule of Performance
Contract Start Date June 18, 2025
Contract End Date June 17, 2028
32 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28

EXHIBIT C
Schedule of Fees
33 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 1

3.5 — RATE SHEETS — CMD WEST
34 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 2

3.5 — RATE SHEETS — CHAPMAN & PATTON
While Chapman & Patton’s fee varies with the complexity of each individual assignment, a representative report fee is approximately $3,900 per parcel, based on previous Projects. 35 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 3

3.5 — RATE SHEETS — SIERRA WEST VALUATION
36 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 4

3.5 — RATE SHEETS — DM&A
37 City of West Sacramento — On-Call Right-of-Way Services — 25-010-RFQ | 5

3.5 — RATE SHEETS — TERRACON
38 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28

EXHIBIT D
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
[Labor Code § 1861]
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

CONSULTANTS
By:

Connor McDonald, Principal
39 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28

EXHIBIT D

LABOR COMPLIANCE

1. PREVAILING WAGE
A. The Work contemplated herein constitutes a public work within the meaning of Labor Code sections 1720 and 1771. It shall be mandatory upon the Consultant and upon any Subcontractor, to pay not less than the said specified prevailing rates of wages to all workers employed by them under the Contract in accordance with Labor Code section 1774. The Director of the Department of Industrial Relations ("DIR") of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract. The Consultant acknowledges that it has examined the prevailing rate of per diem wages as established by the DIR. Copies of the current schedules for prevailing wages are on file at City Hall, and the contents of those schedules are incorporated herein as if set forth in full. The Consultant shall post a copy of the applicable prevailing wage determinations at each job site, along with any other work place posters required by law.

B. The City will not recognize any claims for additional compensation because of the payment of prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in determining its proposal, and will not under any circumstances be considered as the basis of a claim against the City.

C. By executing this Contract Consultant warrants that it has registered with the Department of Industrial Relations in accordance with Labor Code section 1725.5.

2. PREVAILING WAGE RECORDS
A. The Consultant and each subcontractor shall keep an accurate payroll record which shows the name, address, social security number, correct work classification (in accordance with the wage decision), both straight and overtime worked each day and week, and hourly rate of pay, gross wages earned, deductions made and net wages paid to each journeyman, apprentice, worker or other employee paid by the Consultant /subcontractor in connection with the Work. These payroll records shall be certified and shall be made available at Consultant's principal office. These records shall be maintained during the course of the Work. The Consultant and all subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site.

B. The City shall notify the Consultant in writing of any discrepancies or violations that are discovered during such inspections. Written notification pursuant to this Section shall include the actions that will be necessary to resolve the discrepancies and/or violations. The Consultant shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all subcontractors and any lower-tier subcontractors. The Consultant shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Consultant or any subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775.

C. To the extent applicable, Consultant and subcontractors shall maintain and furnish to the Department of Industrial Relations ("DIR"), a certified copy of each weekly payroll (but no less 40 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28
often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports shall be transmitted electronically to the DIR.

D. The City will not recognize any claims for additional compensation because of the payment of the prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in entering into the Contract, and will not under any circumstances, other than delays caused by the City, or the City’s agents, be considered as the basis of a claim against the City.

3. Labor Discrimination
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of their race, color, national origin or ancestry, physical handicap, mental condition, marital status, or sex of such person, except as provided in Section 12940 of the Government Code, and every General Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter.” 4 Eight-Hour Day Limitation
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, incorporated herein by reference, eight hours labor shall constitute a day's work, and no worker in the employ of Consultant, or any Subcontractor, doing or contracting to do any part of the work contemplated by the Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code Section 1815, a worker may perform work in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay. (b) The Consultant and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Contract.

This record shall be open at all reasonable hours to the inspection of the City. It is hereby further agreed that, except as provided in (a) above, the Consultant shall forfeit as a penalty to the City the sum of twenty-five dollars ($25) for each worker employed in the performance of the Contract by the Consultant or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.

5. Compliance with State Requirements for Employment of Apprentices (a) The Consultant's attention is directed to Section 1777.5 of the Labor Code.

Provisions of said Section pertaining to employment of registered apprentices are hereby incorporated by reference into this Contract. As applicable, the Consultant or any Subcontractor employed by the Consultant in the performance of this Contract shall take such actions as necessary to comply with the provisions of Section 1777.5.
41 CMD West Company
CPA25-157 On-Call ROW Services
Expires on 06/17/28

EXHIBIT E

NOTICE TO PROCEED
42 1110 West Capitol Avenue
West Sacramento, CA 95691
(916) 617-4500
www.cityofwestsacramento.org
City of West Sacramento

NOTICE TO PROCEED
Date:

Requested by:

Managing Dept:

Task Start Date:

Completion Date:

The following information must be included on all invoices: (NTP# format: "Contract number-NTP01") • Contract #:
• NTP #:
• GL Cost Center(s):

Notice to Proceed is invalid unless fully executed
Requested by:

Dept Head approval:
____________________________________________________ Date: ______________ ____________________________________________________ Date: ______________ Finance Budget approval: ____________________________________________________Date: ______________ Over $10k also requires City Manager Approval
City Manager Approval: _________________________________________________ Date: ______________ Amanda Berlin, Assistant City Manager
Vendor Name:

Vendor Address:

Contact Name:

Contact Info:

Project Name:

Not-to-Exceed Amount:

Description of Services:
013024
Please specify amount
per cost center for PO setup
☐Change to previous NTP.

Amount of Increase or Decrease:
43 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
1 11.4.2024

CONTRACT FOR SERVICES
THIS CONTRACT is made on June 18, 2025, by and between the CITY OF WEST SACRAMENTO (“City”), and Interwest Consulting Group, Inc. (“Consultant”).

WITNESSETH:

WHEREAS, the City desires to retain Interwest Consulting Group, Inc. for right of way acquisition services for existing and future operations & maintenance projects, capital improvement projects, and other citywide projects requiring such services; WHEREAS, the Consultant has presented a proposal for such services to the City, dated April, 8, 2025, (attached hereto as Exhibit “A”) and is duly licensed, qualified and experienced to perform those services;
NOW, THEREFORE, the parties hereto mutually agree as follows:

1. SCOPE OF SERVICES:

A. Consultant shall do all work, attend all meetings, produce all reports and carry out all activities necessary to completion of the services described in Exhibit “A”. This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of conflict between terms contained in these Contract Documents, the more specific term shall control. If any portion of the Contract Documents shall be in conflict with any other portion, provisions contained in the Contract shall govern over conflicting provisions contained in the exhibits to the Contract.

B. Consultant enters into this Contract as an independent contractor and not as an employee of the City. The Consultant shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant are employees, agents, contractors or subcontractors of the Consultant and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, To the greatest extent permitted by law, Consultant and its employees, agents, and subcontractors shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Attachment 2
44 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
2 11.4.2024
C. The Consultant agrees it has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.

2. TERM OF CONTRACT
A. The services of Consultant are to commence upon execution of this Contract by the City, and shall be undertaken and completed per subsequent Notice to Proceeds prescribed by the City. The term of this Contract, subject to termination as set forth in Section 4, shall terminate on June 17, 2028.

B. Consultant’s failure to complete work in accordance with the Schedule of Performance may result in delayed compensation as described in Section 3.

C. The City Manager or his or her designee may, by written instrument signed by the Parties, extend the duration of this Contract for two (2) additional one-year extensions in the manner provided in Section 5, provided that the extension does not require the payment of compensation in excess of the Council approved budget.

3. COMPENSATION:

A. The Consultant shall be paid monthly for the actual fees, costs and expenses for all time and materials required and expended, but in no event shall total compensation exceed One hundred thousand dollars and no cents ($100,000.00), without City’s prior written approval. Consultant's fees shall be as specified in the Schedule of Fees, which is attached hereto an incorporated herein as Exhibit "C".

B. Said amount shall be paid upon submittal of a monthly billing showing completion of the tasks that month. Consultant shall furnish City with invoices for all expenses as well as for all materials authorized by this Contract. The invoices shall be submitted with the monthly billings.

If Consultant’s performance is not in conformity with the Schedule of Performance, payments may be delayed or denied, unless the Consultant’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform with the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.

C. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section 4.

4. TERMINATION:

A. This Contract may be terminated by either party, provided that the other party is given not less than 30 calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.

B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant shall immediately suspend its activities under this Contract. 45 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
3 11.4.2024
C. Notwithstanding any provisions of this Contract, Consultant shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant, and the City may withhold any payments due to Consultant until such time as the exact amount of damages, if any, due the City from Consultant is determined.

D. In the event of termination, the Consultant shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.

5. AMENDMENTS, CHANGES OR MODIFICATIONS:

Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto.

6. EXTENSIONS OF TIME:

Consultant may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Work Program in the manner provided in Section 5.

7. PROPERTY OF CITY:

A. It is mutually agreed that all materials prepared by the Consultant under this Contract shall become the property of the City, and the Consultant shall have no property right therein whatsoever. Immediately upon termination, the City shall be entitled to, and the Consultant shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant in performing this Contract which is not Consultant’s privileged information, as defined by law, or Consultant’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant’s possession.

B. Additionally, it is agreed that the parties intend this to be a contract for services and each considers the products and results of the services to be rendered by Consultant hereunder (the “Work”) to be a work made for hire. Consultant acknowledges and agrees that the Work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of the City.

8. COMPLIANCE WITH ALL LAWS:

A. Consultant shall comply with all applicable laws, ordinances, and codes of federal, State and local governments, and shall commit no trespass on any public or private property in performing any of the work authorized by this Contract.

B. Consultant warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that it has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable it to perform this Contract. 46 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
4 11.4.2024

FOR WORK SUBJECT TO PREVAILING WAGES
C. The work contemplated under this Contract is a public work for the purposes of Labor Code section 1720, and is subject to the payment of prevailing wages. Accordingly, Consultant shall comply with the provisions of Exhibit "D".

9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT:

A. Consultant agrees and represents that it is qualified to properly provide the services set forth in Exhibit “A” in a manner which is consistent with the generally accepted standards of Consultant’s profession.

B. Consultant agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, State and local law in accordance with Section 17A hereof.

C. Consultant shall designate a project manager who at all times shall represent the Consultant before the City on all matters relating to this Contract. The project manager shall continue in such capacity unless and until he or she is removed at the request of the City, is no longer employed by Consultant, or is replaced with the written approval of the City, which approval shall not be unreasonably withheld.

D. Consultant shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant in writing within sixty (60) days of discovery. Should Consultant fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant shall be liable for any expenses thereby incurred.

10. SUBCONTRACTING:

None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant.

11. ASSIGNABILITY:

Consultant shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld.

However, claims for money due or to become due Consultant from the City under this Contract may be assigned to a financial institution, or to a trustee in bankruptcy, without such approval.

Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.

12. INTEREST IN CONTRACT:

Consultant covenants that neither it, nor any of its employees, agents, contractors, subcontractors has any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the performance of its services hereunder. Consultant shall make all disclosures required by the 47 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
5 11.4.2024
City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant in writing that Consultant’s duties under this Contract warrant greater disclosure by Consultant than was originally contemplated. Consultant shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.

13. MATERIALS CONFIDENTIAL:

All of the materials prepared or assembled by Consultant pursuant to performance of this Contract are confidential and Consultant agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.

14. LIABILITY OF CONSULTANT-NEGLIGENCE:

Consultant shall be responsible for performing the work under this Contract in a manner which is consistent with the generally-accepted standards of the Consultant’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant or its employees, agents, contractors or subcontractors.

15. INDEMNITY AND LITIGATION COSTS:

Consultant shall indemnify, defend, and hold harmless the City, its officers, officials, agents, and employees against all claims, damages, demands, liability, costs, losses and expenses, including without limitation court costs and reasonable attorneys’ fees, arising from Consultant's negligent acts or negligent failure to act, errors, omissions or willful misconduct incident to the performance of this Contract except such loss or damage caused by the active negligence, sole negligence, or willful misconduct of the City. The provisions of this paragraph shall survive termination or suspension of this Contract.

16. CONSULTANT TO PROVIDE INSURANCE:

A. Consultant shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract, the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A VII (an NR rating is acceptable for Worker’s Compensation insurance written with the State Compensation Insurance Fund of California).

B. Prior to execution of this Contract and prior to commencement of any work, the Consultant shall furnish the City with certificates of insurance and copies of endorsements providing evidence of coverage for all policies required by the Contract. The Consultant and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant 48 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
6 11.4.2024
or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Approval of the insurance by the City shall not relieve or decrease any liability of Consultant.

1. Worker’s Compensation and Employer’s Liability Insurance a. Worker’s Compensation - Insurance to protect the Consultant, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and Federal statutes and regulations.

The Consultant shall execute a certificate in compliance with Labor Code Section 1861, on the form provided in the Contract Documents.
b. Consultant shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant.

2. Commercial General Liability Insurance
a. The insurance shall be provided on form CG0001, or it’s equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractual liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per occurrence and $2,000,000 general and products/completed operations aggregates. b. The commercial general liability insurance shall also include the following:
i. Endorsement equivalent to CG 2010 0714 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii. Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
iii. Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

3. Commercial Automobile Insurance
49 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
7 11.4.2024
a. The insurance shall include, but shall not be limited to, coverage for claims for bodily injury or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per accident.
b. The commercial automobile insurance shall include the same endorsements required for the commercial general liability policy (see Section

16.B.2.b).

4. Professional Liability. The Consultant and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not be less than $1,000,000 per claim.

C. In addition to any other remedy the City may have, if Consultant fails to maintain the insurance coverage as required in this Section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant under this Contract.

D. No policy required by this Contract shall be suspended, cancelled, terminated by either party, or reduced in coverage or in limits unless Consultant has provided thirty (30) days prior written notice by certified mail, return receipt requested, to the City.

E. Any deductibles or self-insured retentions in excess of $10,000 must be declared to, and approved by, the City.

F. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant under the Contract.

17. MISCELLANEOUS PROVISIONS:

A. Consultant shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work.

B. Consultant shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orientation. 50 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
8 11.4.2024
C. Consultant shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant.

D. This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing.

E. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:

City: Fred Arnold, Senior Program Manager
City of West Sacramento
1110 West Capitol Avenue, 1st Floor
West Sacramento, CA 95691
Office: 916-617-4954
E-Mail: [email protected]

Consultant: Paul Meschino, President
1 Jenner, Suite 160
Irvine, CA 92618
[email protected]

F. This Contract shall be interpreted and governed by the laws of the State of California.

G. Any action arising out of this Contract shall be brought and maintained in Yolo County California, regardless of where else venue may lie.

H. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsibility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party.

I. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
[Signatures on following page]
51 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
9 11.4.2024

CITY OF WEST SACRAMENTO
By: __________________________
Amanda Berlin, Assistant City Manager
ATTEST:

By: _______________________
Jennifer Cusmir, City Clerk
APPROVED AS TO FORM:

By: _______________________
Jeffrey Mitchell, City Attorney

INTERWEST CONSULTING GROUP, INC
By: _________________________
Paul Meschino, President
52 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28

EXHIBIT A
Consultant Proposal/Scope of Work
53 TECHNICAL PROJECT APPROACH
PAGE 23 | PROPOSAL FOR ON-CALL RIGHT OF WAY SERVICES INTERWEST TASK NO. 1: PROJECT COORDINATION AND MANAGEMENT

ACTION STEPS DELIVERABLES R E S P O N S I B L E
PERSON
Meetings and
Conference Calls
Strategize, as necessary, with the City and stakeholders to accelerate project delivery. Deliverables will include Interwest’s distribution of meeting notes to all attendees. - John Almazán
Project Reporting Status reports and applicable milestone information entered into the City’s Virtual Project Manager (VPM). - John Almazán Public Meetings Interwest will attend public meetings with City staff and City Council on the acquisition processes. - John Almazán
Scheduling
Interwest will update an MS Project Schedule monthly for each milestone as it relates to right of way services. Each critical action item will be discussed at meetings to ensure parcels are delivered as scheduled.
- Kent Jorgensen
Quality Control Case files will include a detailed checklist for each action item to be performed to file closure. - John Almazán
Data Management Authorized team members will upload data into City’s Virtual Project Manager (VPM). - John Almazán
Cost Estimates If requested, prepare a right of way cost estimate to determine acquisition costs for the project. - Kent Jorgensen

T E A M M E M B E R R E S P O N S I B I L I T I E S
Separating specific management functions with regard to project management, delivery and quality oversight will ensure task assignments are achieved at their highest level and as scheduled.

The chart below illustrates the proven talent of lnterwest’s team leaders. Each person’s depth of knowledge and experience clearly demonstrates their ability to successfully complete all tasks, assignments and deliverables.

TASK NO. 2: TITLE SERVICES

ACTION STEPS DELIVERABLES R E S P O N S I B L E
PERSON
Preliminary Title
Reports (PTRs)
Title company to deliver PTRs and supporting documents to Interwest within seven days of request.
– John Almazán
– Acquisition Agent
Escrow Services
Title company's escrow department to provide third party services to close right of way purchases and process bulk sale on applicable business displacements (as applicable).
– Acquisition Agent
– Coordinator
Litigation
Guarantees
Title company issues insurance with list of potential defendants for eminent domain action. Litigation guarantees to be ordered early on priority parcels.
– John Almazán
TASK NO. 3: ENVIRONMENTAL SURVEY

ACTION STEPS DELIVERABLES R E S P O N S I B L E

PERSON(S)
Phase I
Environmental
Site Assessments
(ESAs)
Prepare ESAs in conformance with the 2013 ASTM Standard Practice for Environmental Assessment, including records review, site reconnaissance, interviews and report preparation. – John Almazánn
– Blackburn Consult.

Phase II
Environmental Site
Assessments (ESAs)
Complete field work and analysis in accordance with the findings outlined in the initial site assessment, then prepare written Phase II Environmental Survey Report.
– John Almazán
– Blackburn Consult.

Remediation Cost
Estimates
Review Phase II ESAs, complete additional testing, as applicable, then prepare clean-up cost and remediation plan to determine Just Compensation amounts for right of way being acquired for the project.
– John Almazánn
– Blackburn Consult.
54 TECHNICAL PROJECT APPROACH
PAGE 24 | PROPOSAL FOR ON-CALL RIGHT OF WAY SERVICES INTERWEST TASK NO. 5: ACQUISITION & NEGOTIATION

ACTION STEPS DELIVERABLES R E S P O N S I B L E
PERSON
Form Development
During the appraisal process, Interwest will prepare and submit all documents associated with providing acquisition services for City approval.
- John Almazán
Offer Package Offer package will be delivered to the City for approval within two days of establishment of Just Compensation. - John Almazán Detailed Case-File
Diaries
Detailed notes will be added to case-file diaries when
meetings, contacts and action steps are performed. Diaries will be available online via City’s Virtual Project Manager. - John Almazán
- Acquisition Agents
Negotiation Process
Interwest acquisition agents are trained in appraisal, offer presentation and negotiation strategies, with a goal of obtaining a signed contract within 30 calendar days of the First Written Offer.
- John Almazán
- Acquisition Agent
Administrative
Settlements
Where appropriate, Interwest will utilize the administrative settlement process as approved by City. A detailed
summary sheet will be sent to the City in a timely manner.

Monitoring -
- Kent Jorgensen
- John Almazán
Monitoring Escrow Upon acceptance of execution of the contract, Interwest will open escrow and expedite closing the transaction.
- Acquisition Agent
- Project Coordinator
Meetings
Interwest’s acquisition team will meet as a group on
a weekly basis to discuss cases and solve open issues to accelerate the process.
- John Almazán
Close-Out Case File
A Quality Control Checklist will be completed as the case progresses. An audit review process sheet will be completed and delivered to the City at project close.
- John Almazán
TASK NO. 4: APPRAISAL & APPRAISAL REVIEW

ACTION STEPS DELIVERABLES R E S P O N S I B L E
PERSON
Manage Appraisers
and Delegate Work
Assignments
Primary appraisals will be assigned under similar data set groups with an emphasis on the ability to delivery reports in 45 to 60 calendar days.
- John Almazán
Prepare Primary
Appraisals in
Accordance with USPAP
standard
Assignments will be delegated based on the property
category and consistency of data sets. Appraisers will
also complete the Summary of Just Compensation to be
included in the first written offer.
- John Almazán
- Appraiser
Review Appraisals
Review appraisals will be completed within seven to 14
calendar days. Emphasis will be placed on linking specific review appraisers with the same primary appraiser for
consistency and processing efficiency.
- John Almazán
- Review Appraiser
Waiver Valuations
Where applicable, on parcels where acquisition areas with low values without significant impacts to the project, waiver valuations will be completed instead of a full Appraisal Report. - Kent Jorgensen
55 TECHNICAL PROJECT APPROACH
PAGE 25 | PROPOSAL FOR ON-CALL RIGHT OF WAY SERVICES INTERWEST TASK NO. 7: PROJECT REPORTING AND DATA MANAGEMENT

ACTION STEPS DELIVERABLES R E S P O N S I B L E
PERSON
Maintain MS Project
Schedule (ROW)
Track and update a detailed acquisition schedule for
all right of way and real estate tasks on a regular basis, comparing milestones and update with current activities. - Kent Jorgensen
Milestone
Delivery Reports
Monitor and report to the City specific tasks and milestones to maintain transparency throughout right of way delivery. - John Almazán Records Management
Utilize the City’s Virtual Project Manager (VPM) records management system online to track budgets, optimize
schedule efficiencies and provide the real-time status of acquisitions. Interwest already uses a cloud-based data management system and is familiar with the process and
capabilities.
- John Almazán
TASK NO. 6 RELOCATION SERVICES

ACTION STEPS DELIVERABLES R E S P O N S I B L E

PERSON(S)
Interview
Completed
for Residential
or Business
Displacement
Collect information on the displacement. This ranges
from simple personal property displacements to full
displacements requiring a variety of relocation advisory services and claim processing.
– Norma Jacquez
– Relocation Agent
Issue Entitlement
Package to
Displacee
Entitlement packages include: Notice of Eligibility; relocation brochure; and first referral properties, as applicable. – Norma Jacquez
– Relocation Agent
Provide Advisory
Services
Advisory services will be provided at a level necessary to expedite the relocation process. This includes referral services and counseling on securing a replacement property and obtaining moving cost estimates.
– Norma Jacquez
– Relocation Agent
Timely Processing
Relocation Claims
Reviewing cost estimates and invoices to categorize expenses into either moving expense or re-establishment expense. Process claims and submit to City.
– Norma Jacquez
– Relocation Agent
Coordinate Move
To Replacement
Property
Monitor the move from beginning to end. Deliverables
are claims processed, final claim, and processing the
Certificate of Abandonment.
– Relocation Agent
Close-Out
Case File
A Quality Control Checklist will be completed as the case progresses. A Caltrans audit review process sheet will be completed and delivered to City at project close.
– Relocation Agent
TASK NO. 8: RIGHT OF WAY CERTIFICATION

ACTION STEPS DELIVERABLES R E S P O N S I B L E
PERSON
Right of Way
Certification
Interwest will coordinate with the City and Caltrans to prepare the Right of Way Certification, as required by Chapter 13, Section 13.10 of the Caltrans Local Assistance Procedures Manual.
- John Almazán
56 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28

EXHIBIT B
Schedule of Performance
Contract Start Date June 18, 2025
Contract End Date June 17, 2028
57 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28

EXHIBIT C
Schedule of Fees
58 RATE SHEET

PROPOSAL FOR ON-CALL RIGHT OF WAY SERVICES INTERWEST
Title / Classification Interwest Staff Hourly Rate
Corporate Broker Kent Jorgensen $225
Senior Project Manager John Almazán $170
Relocation Manager Norma Jacquez $150
Sr. Acquisition/Relocation Agent Jeff Wellcome, SR/WA $140 Sr. Acquisition/Relocation Agent Jeremy Miller, SR/WA $140 Sr. Acquisition Agent Jin Mann $140
Sr. Acquisition/Relocation Agent Tina Nguyen Olvera $140 Sr. Acquisition/Relocation Agent Diana Staudinger $140
Acquisition/Relocation Agent Lois Rodriguez $125
Project/Escrow Coordinator Katrina Rogers $85
INTERWEST CONSULTING GROUP, INC.

Interwest Consulting Group Inc. agrees to maintain pricing pursuant to this submittal for the duration of the initial contract term and any optional extensions.
59 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28

EXHIBIT D
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
[Labor Code § 1861]
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

CONSULTANTS
By:

Connor McDonald, Principal
60 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28

EXHIBIT D

LABOR COMPLIANCE

1. PREVAILING WAGE
A. The Work contemplated herein constitutes a public work within the meaning of Labor Code sections 1720 and 1771. It shall be mandatory upon the Consultant and upon any Subcontractor, to pay not less than the said specified prevailing rates of wages to all workers employed by them under the Contract in accordance with Labor Code section 1774. The Director of the Department of Industrial Relations ("DIR") of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract. The Consultant acknowledges that it has examined the prevailing rate of per diem wages as established by the DIR. Copies of the current schedules for prevailing wages are on file at City Hall, and the contents of those schedules are incorporated herein as if set forth in full. The Consultant shall post a copy of the applicable prevailing wage determinations at each job site, along with any other work place posters required by law.

B. The City will not recognize any claims for additional compensation because of the payment of prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in determining its proposal, and will not under any circumstances be considered as the basis of a claim against the City.

C. By executing this Contract Consultant warrants that it has registered with the Department of Industrial Relations in accordance with Labor Code section 1725.5.

2. PREVAILING WAGE RECORDS
A. The Consultant and each subcontractor shall keep an accurate payroll record which shows the name, address, social security number, correct work classification (in accordance with the wage decision), both straight and overtime worked each day and week, and hourly rate of pay, gross wages earned, deductions made and net wages paid to each journeyman, apprentice, worker or other employee paid by the Consultant /subcontractor in connection with the Work. These payroll records shall be certified and shall be made available at Consultant's principal office. These records shall be maintained during the course of the Work. The Consultant and all subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site.

B. The City shall notify the Consultant in writing of any discrepancies or violations that are discovered during such inspections. Written notification pursuant to this Section shall include the actions that will be necessary to resolve the discrepancies and/or violations. The Consultant shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all subcontractors and any lower-tier subcontractors. The Consultant shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Consultant or any subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775.

C. To the extent applicable, Consultant and subcontractors shall maintain and furnish to the Department of Industrial Relations ("DIR"), a certified copy of each weekly payroll (but no less 61 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28
often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports shall be transmitted electronically to the DIR.

D. The City will not recognize any claims for additional compensation because of the payment of the prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in entering into the Contract, and will not under any circumstances, other than delays caused by the City, or the City’s agents, be considered as the basis of a claim against the City.

3. Labor Discrimination
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of their race, color, national origin or ancestry, physical handicap, mental condition, marital status, or sex of such person, except as provided in Section 12940 of the Government Code, and every General Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter.” 4 Eight-Hour Day Limitation
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, incorporated herein by reference, eight hours labor shall constitute a day's work, and no worker in the employ of Consultant, or any Subcontractor, doing or contracting to do any part of the work contemplated by the Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code Section 1815, a worker may perform work in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay. (b) The Consultant and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Contract.

This record shall be open at all reasonable hours to the inspection of the City. It is hereby further agreed that, except as provided in (a) above, the Consultant shall forfeit as a penalty to the City the sum of twenty-five dollars ($25) for each worker employed in the performance of the Contract by the Consultant or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.

5. Compliance with State Requirements for Employment of Apprentices (a) The Consultant's attention is directed to Section 1777.5 of the Labor Code.

Provisions of said Section pertaining to employment of registered apprentices are hereby incorporated by reference into this Contract. As applicable, the Consultant or any Subcontractor employed by the Consultant in the performance of this Contract shall take such actions as necessary to comply with the provisions of Section 1777.5.
62 Interwest Consulting Group, Inc.

CPA25-165 On-Call ROW Services
Expires on 06/17/28

EXHIBIT E

NOTICE TO PROCEED
63 1110 West Capitol Avenue
West Sacramento, CA 95691
(916) 617-4500
www.cityofwestsacramento.org
City of West Sacramento

NOTICE TO PROCEED
Date:

Requested by:

Managing Dept:

Task Start Date:

Completion Date:

The following information must be included on all invoices: (NTP# format: "Contract number-NTP01") • Contract #:
• NTP #:
• GL Cost Center(s):

Notice to Proceed is invalid unless fully executed
Requested by:

Dept Head approval:
____________________________________________________ Date: ______________ ____________________________________________________ Date: ______________ Finance Budget approval: ____________________________________________________Date: ______________ Over $10k also requires City Manager Approval
City Manager Approval: _________________________________________________ Date: ______________ Amanda Berlin, Assistant City Manager
Vendor Name:

Vendor Address:

Contact Name:

Contact Info:

Project Name:

Not-to-Exceed Amount:

Description of Services:
013024
Please specify amount
per cost center for PO setup
☐Change to previous NTP.

Amount of Increase or Decrease:
64 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
1 11.4.2024

CONTRACT FOR SERVICES
THIS CONTRACT is made on June 18, 2025, by and between the CITY OF WEST SACRAMENTO (“City”), and Monument ROW, Inc. (“Consultant”).

WITNESSETH:

WHEREAS, the City desires to retain Monument ROW, Inc. for right of way acquisition services for existing and future operations & maintenance projects, capital improvement projects, and other citywide projects requiring such services; WHEREAS, the Consultant has presented a proposal for such services to the City, dated April, 8, 2025, (attached hereto as Exhibit “A”) and is duly licensed, qualified and experienced to perform those services;
NOW, THEREFORE, the parties hereto mutually agree as follows:

1. SCOPE OF SERVICES:

A. Consultant shall do all work, attend all meetings, produce all reports and carry out all activities necessary to completion of the services described in Exhibit “A”. This Contract and its exhibits shall be known as the “Contract Documents.” Terms set forth in any Contract Document shall be deemed to be incorporated in all Contract Documents as if set forth in full therein. In the event of conflict between terms contained in these Contract Documents, the more specific term shall control. If any portion of the Contract Documents shall be in conflict with any other portion, provisions contained in the Contract shall govern over conflicting provisions contained in the exhibits to the Contract.

B. Consultant enters into this Contract as an independent contractor and not as an employee of the City. The Consultant shall have no power or authority by this Contract to bind the City in any respect. Nothing in this Contract shall be construed to be inconsistent with this relationship or status. All employees, agents, contractors or subcontractors hired or retained by the Consultant are employees, agents, contractors or subcontractors of the Consultant and not of the City. The City shall not be obligated in any way to pay any wage claims or other claims made against Consultant by any such employees, agents, contractors or subcontractors, or any other person resulting from performance of this Contract. In the event that Consultant or any employee, agent, or subcontractor of Consultant providing services under this Agreement claims or is determined by a court of competent jurisdiction or the California Public Employees Retirement System (PERS) to be eligible for enrollment in PERS as an employee of the City, Consultant shall indemnify, defend, and hold harmless City for the payment of any employee and/or employer contributions for PERS benefits on behalf of Consultant or its employees, agents, or subcontractors, as well as for the payment of any penalties and interest on such contributions, which would otherwise be the responsibility of City. Notwithstanding any other agency, state or federal policy, rule, regulation, law or ordinance to the contrary, To the greatest extent permitted by law, Consultant and its employees, agents, and subcontractors shall not qualify for or become entitled to, and hereby agree to waive any claims to, any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in PERS as an employee of City and entitlement to any contribution to be paid by City for employer contribution and/or employee contributions for PERS benefits.

Attachment 3
65 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
2 11.4.2024
C. The Consultant agrees it has satisfied itself by its own investigation and research regarding the conditions affecting the work to be done and labor and materials needed, and that its decision to execute this Contract is based on such independent investigation and research.

2. TERM OF CONTRACT
A. The services of Consultant are to commence upon execution of this Contract by the City, and shall be undertaken and completed per subsequent Notice to Proceeds prescribed by the City. The term of this Contract, subject to termination as set forth in Section 4, shall terminate on June 17, 2028.

B. Consultant’s failure to complete work in accordance with the Schedule of Performance may result in delayed compensation as described in Section 3.

C. The City Manager or his or her designee may, by written instrument signed by the Parties, extend the duration of this Contract for two (2) additional one-year extensions in the manner provided in Section 5, provided that the extension does not require the payment of compensation in excess of the Council approved budget.

3. COMPENSATION:

A. The Consultant shall be paid monthly for the actual fees, costs and expenses for all time and materials required and expended, but in no event shall total compensation exceed One hundred thousand dollars and no cents ($100,000.00), without City’s prior written approval. Consultant's fees shall be as specified in the Schedule of Fees, which is attached hereto an incorporated herein as Exhibit "C".

B. Said amount shall be paid upon submittal of a monthly billing showing completion of the tasks that month. Consultant shall furnish City with invoices for all expenses as well as for all materials authorized by this Contract. The invoices shall be submitted with the monthly billings.

If Consultant’s performance is not in conformity with the Schedule of Performance, payments may be delayed or denied, unless the Consultant’s failure to perform in conformity with the Schedule of Performance is a documented result of the City’s failure to conform with the Schedule of Performance, or if the Schedule of Performance is extended pursuant to Section 5.

C. If the work is halted at the request of the City, compensation shall be based upon the proportion that the work performed bears to the total work required by this Contract, subject to Section 4.

4. TERMINATION:

A. This Contract may be terminated by either party, provided that the other party is given not less than 30 calendar days’ written notice (delivered by certified mail, return receipt requested) of intent to terminate.

B. The City may temporarily suspend this Contract, at no additional cost to City, provided that the Consultant is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Consultant shall immediately suspend its activities under this Contract. 66 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
3 11.4.2024
C. Notwithstanding any provisions of this Contract, Consultant shall not be relieved of liability to the City for damages sustained by the City by virtue of any breach of this Contract by Consultant, and the City may withhold any payments due to Consultant until such time as the exact amount of damages, if any, due the City from Consultant is determined.

D. In the event of termination, the Consultant shall be compensated as provided for in this Contract, except as provided in Section 4C. Upon termination, the City shall be entitled to all work, including but not limited to, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date in accordance with Section 7 hereof.

5. AMENDMENTS, CHANGES OR MODIFICATIONS:

Amendments, changes or modifications in the terms of this Contract may be made at any time by mutual written agreement between the parties hereto and shall be signed by the persons authorized to bind the parties hereto.

6. EXTENSIONS OF TIME:

Consultant may, for good cause, request extensions of time to perform the services required hereunder. Such extensions shall be authorized in advance by the City in writing and shall be incorporated in written amendments to this Contract or the attached Work Program in the manner provided in Section 5.

7. PROPERTY OF CITY:

A. It is mutually agreed that all materials prepared by the Consultant under this Contract shall become the property of the City, and the Consultant shall have no property right therein whatsoever. Immediately upon termination, the City shall be entitled to, and the Consultant shall deliver to the City, all data, drawings, specifications, reports, estimates, summaries and other such materials as may have been prepared or accumulated to date by the Consultant in performing this Contract which is not Consultant’s privileged information, as defined by law, or Consultant’s personnel information, along with all other property belonging exclusively to the City which is in the Consultant’s possession.

B. Additionally, it is agreed that the parties intend this to be a contract for services and each considers the products and results of the services to be rendered by Consultant hereunder (the “Work”) to be a work made for hire. Consultant acknowledges and agrees that the Work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of the City.

8. COMPLIANCE WITH ALL LAWS:

A. Consultant shall comply with all applicable laws, ordinances, and codes of federal, State and local governments, and shall commit no trespass on any public or private property in performing any of the work authorized by this Contract.

B. Consultant warrants to the City that it is licensed by all applicable governmental bodies to perform this Contract and will remain so licensed throughout the progress of the Work, and that it has, and will have, throughout the progress of the Work, the necessary experience, skill and financial resources to enable it to perform this Contract. 67 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
4 11.4.2024

FOR WORK SUBJECT TO PREVAILING WAGES
C. The work contemplated under this Contract is a public work for the purposes of Labor Code section 1720, and is subject to the payment of prevailing wages. Accordingly, Consultant shall comply with the provisions of Exhibit "D".

9. WARRANTIES AND RESPONSIBILITIES - CONSULTANT:

A. Consultant agrees and represents that it is qualified to properly provide the services set forth in Exhibit “A” in a manner which is consistent with the generally accepted standards of Consultant’s profession.

B. Consultant agrees and represents that the work performed under this Contract shall be in accordance with applicable federal, State and local law in accordance with Section 17A hereof.

C. Consultant shall designate a project manager who at all times shall represent the Consultant before the City on all matters relating to this Contract. The project manager shall continue in such capacity unless and until he or she is removed at the request of the City, is no longer employed by Consultant, or is replaced with the written approval of the City, which approval shall not be unreasonably withheld.

D. Consultant shall provide corrective services without charge to the City for services which fail to meet the above professional and legal standards and which are reported to Consultant in writing within sixty (60) days of discovery. Should Consultant fail or refuse to perform promptly its obligations, the City may render or undertake performance thereof and the Consultant shall be liable for any expenses thereby incurred.

10. SUBCONTRACTING:

None of the services covered by this Contract shall be subcontracted without the prior written consent of the City, which will not be unreasonably withheld. Consultant shall be as fully responsible to the City for the negligent acts and omissions of its contractors and subcontractors, and of persons either directly or indirectly employed by them, as it is for the negligent acts and omissions of persons directly employed by Consultant.

11. ASSIGNABILITY:

Consultant shall not assign or transfer any interest in this Contract whether by assignment or novation, without the prior written consent of the City which will not be unreasonably withheld.

However, claims for money due or to become due Consultant from the City under this Contract may be assigned to a financial institution, or to a trustee in bankruptcy, without such approval.

Notice of any assignment or transfer whether voluntary or involuntary shall be furnished promptly to the City.

12. INTEREST IN CONTRACT:

Consultant covenants that neither it, nor any of its employees, agents, contractors, subcontractors has any interest, nor shall they acquire any interest, direct or indirect, in the subject of the Contract, nor any other interest which would conflict in any manner or degree with the performance of its services hereunder. Consultant shall make all disclosures required by the 68 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
5 11.4.2024
City’s conflict of interest code in accordance with the category designated by the City, unless the City Manager determines in writing that Consultant’s duties are more limited in scope than is warranted by the category designated by the City code and that a narrower disclosure category should apply. Consultant also agrees to make disclosure in compliance with the City conflict of interest code if, at any time after the execution of this Contract, City determines and notifies Consultant in writing that Consultant’s duties under this Contract warrant greater disclosure by Consultant than was originally contemplated. Consultant shall make disclosures in the time, place and manner set forth in the conflict of interest code and as directed by the City.

13. MATERIALS CONFIDENTIAL:

All of the materials prepared or assembled by Consultant pursuant to performance of this Contract are confidential and Consultant agrees that they shall not be made available to any individual or organization without the prior written approval of the City, except by court order.

14. LIABILITY OF CONSULTANT-NEGLIGENCE:

Consultant shall be responsible for performing the work under this Contract in a manner which is consistent with the generally-accepted standards of the Consultant’s profession and shall be liable for its own negligence and the negligent acts of its employees, agents, contractors and subcontractors. The City shall have no right of control over the manner in which the work is to be done but only as to its outcome, and shall not be charged with the responsibility of preventing risk to Consultant or its employees, agents, contractors or subcontractors.

15. INDEMNITY AND LITIGATION COSTS:

Consultant shall indemnify, defend, and hold harmless the City, its officers, officials, agents, and employees against all claims, damages, demands, liability, costs, losses and expenses, including without limitation court costs and reasonable attorneys’ fees, arising from Consultant's negligent acts or negligent failure to act, errors, omissions or willful misconduct incident to the performance of this Contract except such loss or damage caused by the active negligence, sole negligence, or willful misconduct of the City. The provisions of this paragraph shall survive termination or suspension of this Contract.

16. CONSULTANT TO PROVIDE INSURANCE:

A. Consultant shall not commence any work before obtaining, and shall maintain in force at all times during the duration and performance of this Contract, the policies of insurance specified in this Section. Such insurance must have the approval of the City as to limit, form, and amount, and shall be placed with insurers with a current A.M. Best’s rating of no less than A VII (an NR rating is acceptable for Worker’s Compensation insurance written with the State Compensation Insurance Fund of California).

B. Prior to execution of this Contract and prior to commencement of any work, the Consultant shall furnish the City with certificates of insurance and copies of endorsements providing evidence of coverage for all policies required by the Contract. The Consultant and its contractors and subcontractors shall, at their expense, maintain in effect at all times during the performance of work under the Contract not less than the following coverage and limits of insurance, which shall be maintained with insurers and under forms of policy satisfactory to the City. The maintenance by Consultant and its contractors and subcontractors of the following coverage and limits of insurance is a material element of this Contract. The failure of Consultant 69 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
6 11.4.2024
or of any of its contractors or subcontractors to maintain or renew coverage or to provide evidence of renewal may be treated by the City as a material breach of this Contract. Approval of the insurance by the City shall not relieve or decrease any liability of Consultant.

1. Worker’s Compensation and Employer’s Liability Insurance a. Worker’s Compensation - Insurance to protect the Consultant, its contractors and subcontractors from all claims under Worker’s Compensation and Employer’s Liability Acts, including Longshoremen’s and Harbor Worker’s Act (“Acts”), if applicable. Such coverage shall be maintained, in type and amount, in strict compliance with all applicable state and Federal statutes and regulations.

The Consultant shall execute a certificate in compliance with Labor Code Section 1861, on the form provided in the Contract Documents.
b. Consultant shall provide a Waiver of Subrogation endorsement in favor of the City, its officers, officials, employees, agents and volunteers for losses arising from work performed by the Consultant.

2. Commercial General Liability Insurance
a. The insurance shall be provided on form CG0001, or it’s equivalent, and shall include coverage for claims for bodily injury or property damage arising out of premises/operations, products/completed operations, contractual liability, and subconsultant’s work and personal and advertising injury resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per occurrence and $2,000,000 general and products/completed operations aggregates. b. The commercial general liability insurance shall also include the following:
i. Endorsement equivalent to CG 2010 0714 naming the City, its officers, officials, employees, agents, and volunteers as additional insureds. The endorsement shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii. Endorsement stating insurance provided to the City shall be primary as respects the City, its officers, officials, employees and any insurance or self insurance maintained by the City, its officers, officials, employees or volunteers shall be in excess of the Consultant’s insurance and shall not contribute with it, to the payment or satisfaction of any defense expenses, loss, or judgment.
iii. Provision or endorsement stating that the Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability.

3. Commercial Automobile Insurance
70 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
7 11.4.2024
a. The insurance shall include, but shall not be limited to, coverage for claims for bodily injury or property damage for owned, non-owned, and hired automobiles resulting from actions, failures to act, or operations of the insured, or by its employees or agents, or by anyone directly or indirectly employed by the insured. The amount of insurance coverage shall not be less than $1,000,000 per accident.
b. The commercial automobile insurance shall include the same endorsements required for the commercial general liability policy (see Section

16.B.2.b).

4. Professional Liability. The Consultant and its contractors and subcontractors shall secure and maintain in full force, during the term of this Contract and for five years thereafter, professional liability insurance policies appropriate to the respective professions and the work to be performed as specified in this Contract. The limits of such professional liability insurance coverage shall not be less than $1,000,000 per claim.

C. In addition to any other remedy the City may have, if Consultant fails to maintain the insurance coverage as required in this Section, the City may obtain such insurance coverage as is not being maintained, in form and amount substantially the same as is required herein, and the City may deduct the cost of such insurance from any amounts due or which may become due Consultant under this Contract.

D. No policy required by this Contract shall be suspended, cancelled, terminated by either party, or reduced in coverage or in limits unless Consultant has provided thirty (30) days prior written notice by certified mail, return receipt requested, to the City.

E. Any deductibles or self-insured retentions in excess of $10,000 must be declared to, and approved by, the City.

F. The requirement as to types, limits, and the City’s approval of insurance coverage to be maintained by Consultant are not intended to, and shall not in any manner, limit or qualify the liabilities and obligations assumed by Consultant under the Contract.

17. MISCELLANEOUS PROVISIONS:

A. Consultant shall keep itself fully informed of, shall observe and comply with, and shall cause any and all persons, firms or corporations employed by it or under its control to observe and comply with, applicable federal, state, county and municipal laws, ordinances, regulations, orders and decrees which in any manner affect those engaged or employed on the work described by this Contract or the materials used or which in any way affect the conduct of the work.

B. Consultant shall not engage in unlawful employment discrimination. Such unlawful employment discrimination includes, but is not limited to, employment discrimination based upon a person’s race, religious creed, color, national origin, ancestry, physical handicap, medical condition, marital status, gender, citizenship, or sexual orientation. 71 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
8 11.4.2024
C. Consultant shall maintain and make available for inspection by the City and its auditors accurate records of all of its costs, disbursements and receipts with respect to any work under this Contract. Such inspections may be made during regular office hours at any time until six (6) months after the final payments under this Contract are made to the Consultant.

D. This Contract constitutes the entire agreement between the parties relative to the services specified herein and no modification hereof shall be effective unless and until such modification is evidenced by a writing signed by both parties to this Contract. There are no understandings, agreements, conditions, representations, warranties or promises, with respect to this Contract, except those contained in or referred to in the writing.

E. All notices that are required to be given by one party to the other under this Contract shall be in writing and shall be deemed to have been given if delivered personally or enclosed in a properly addressed envelope and deposited in a United States Post Office for delivery by registered or certified mail addressed to the parties at the following addresses:

City: Fred Arnold, Senior Program Manager
City of West Sacramento
1110 West Capitol Avenue, 1st Floor
West Sacramento, CA 95691
Office: 916-617-4954
E-Mail: [email protected]

Consultant: Bob Morrison, Vice President
200 Spectrum Center, Suite 300
Irvine, CA 92618
[email protected]

F. This Contract shall be interpreted and governed by the laws of the State of California.

G. Any action arising out of this Contract shall be brought and maintained in Yolo County California, regardless of where else venue may lie.

H. In any action brought by either party to enforce the terms of this Contract, each party shall be bear responsibility for its attorney’s fees and all costs regardless of whether one party is determined to be the prevailing party.

I. ELECTRONIC TRANSMISSION OF CONTRACT AND SIGNATURE. By electronically signing this document in electronic form, Parties agree that this Agreement may be transmitted and signed electronically by all Parties, and that such signatures shall have the same force and effect as original signatures, in accordance with California law and regulations, including but not limited to Civil Code Section 1633.7
[Signatures on following page]
72 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
9 11.4.2024

CITY OF WEST SACRAMENTO
By: __________________________
Amanda Berlin, Assistant City Manager
ATTEST:

By: _______________________
Jennifer Cusmir, City Clerk
APPROVED AS TO FORM:

By: _______________________
Jeffrey Mitchell, City Attorney

MONUMENT ROW, INC
By: _________________________
Bob Morrison, Vice President
73 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28

EXHIBIT A
Consultant Proposal/Scope of Work
74 PROPOSAL FOR ON-CALL RIGHT-OF-WAY SERVICES
City of West Sacramento
RFQ #25-010-RFQ
SUBMITTED APRIL 8, 2025

PREPARED FOR

CITY OF WEST

SACRAMENTO
Attn: Dagoberto Fierros
Senior Analyst
1110 West Capitol Avenue
West Sacramento, CA 95691

PREPARED BY

MONUMENT
3626 Fair Oaks Blvd.

Suite 100
Sacramento, CA 95864
Ph: 800.577.0109
monumentrow.com
C. TECHNICAL

PROJECT APPROACH
75 UNDERSTANDING AND APPROACH
Utilizing a combination of state and federal grants and City contributions, the City of West Sacramento has undertaken numerous Capital Improvement Projects over recent years. Due to our current involvement supporting the planning, design and execution of several of these projects throughout the City, Monument has a thorough understanding of the City’s goals and are committed to supporting the continued growth of this community. With a variety of projects on the horizon, including bridge, Complete Streets, and Active Transportation Program projects, Monument’s broad experience and expertise in providing a full range of right-of-way services in compliance with Caltrans, State and local funding guidelines will continue to be an invaluable resource to the the City of West Sacramento.

These future projects, including the Sycamore Trails Extension, North 5th Street Complete Streets, and South Riverwalk Trails Extension, will require a right-of-way partner with a high level of technical skill and a thorough understanding of all applicable funding requirements to ensure that they can be completed in the most efficient and cost effective manner possible. Monument is fully capable of supporting the City with any and all required right-of-way services to support their upcoming projects, as detailed in the below approach to the requested scope of work.

PROJECT MANAGEMENT & COORDINATION
Jennifer Cole and our key staff will be responsible for the technical and administrative functions required to provide all needed right-of-way services for any of the City’s projects. Depending on the needs of the individual project assignments, Jennifer will plan, organize, supervise, coordinate, and administer all elements of each scope of work, which typically include the following tasks:
• Monument will meet with the City, their selected design consultant, and other relevant parties regarding each proposed project to discuss project status, budget, and schedules, and advise on any perceived challenges in completing the right-of-way scope. • Prepare and implement an effective Acquisition Management Plan to ensure the Project is delivered in the most efficient and cost-effective manner, and in compliance with all applicable laws, regulations and procedures.
• Coordinate and attend regular meetings with the City to communicate project updates, coordinate right-of-way issues and make recommendations on policy development, risk mitigation and general project consultation.
• Prepare and deliver written progress status reports for acquisition and relocation cases and create, monitor and update project schedules, as needed. • Participate in project related meetings and represent the City in presentations and public hearings on matters pertaining to the acquisition process. • Coordinate with City staff and legal counsel to develop standardized templates for all appraisals, environmental reports, offer documents and other materials in accordance with funding requirements and City standards.
• Implement and maintain a Quality Assurance/Quality Control (QA/QC) plan throughout the duration of each project, ensuring that all appraisals, reports, plans, ESAs, estimates, and offer documents are complete and accurate, and meet professional standard practices. • Finalize all work products, and prepare and deliver presentations to City staff and key stakeholders, as appropriate.
1 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 76 APPRAISAL SERVICES
Monument has proudly worked alongside our appraisal subconsultants, Ross Campbell of Corsair Commercial Enterprises, and Adam Bursch of Western Valuation, to value full-fee, partial take, easement and TCE interests for countless public agencies. All appraisals and appraisal reviews for the acquisition of real property will be prepared in accordance with the URA (49 CFR Part 24) and with the Uniform Standards of Professional Appraisal Practice (USPAP). During the appraisal process, Monument will be responsible for the following procedures:
• Prepare appraisal scope, fees, and timing on a property-by-property basis. • Prepare and issue Notice of Decision to Appraise (NODA) notices to property owners.

Conduct field reviews of property issues with appraisers. • Make weekly contact with appraisers to update progress. • Review appraisals for quality; request changes/additions as necessary or based on direction from the City.

A single “self-contained” appraisal report will be prepared for each acquisition that will contain, at a minimum, the following required information:
• Description of the physical characteristics of the property being appraised (and, in the case of a partial acquisition, an adequate description of the remaining property). • Items identified as personal property.
• Statement of known and observed encumbrances, if any, along with location, zoning, present use, analysis of highest and best use, and five-year sales history. • All relevant and reliable approaches to value consistent with established appraisal practices.
• An analysis of all identified comparable sales, including a description of all physical, legal, and economic factors contributing to property’s value.
• Statement of the value of the real property to be acquired and, for a partial acquisition, a statement of value of the damages and benefits, if any, to the remaining real property. • The effective date of valuation, date of appraisal, signature, and certification of the appraiser.
• If needed, expert witness testimony can be provided for an additional fee.

Appraisal Review. As required for federally-funded projects, Monument’s in-house review appraiser, Vaughn Hosmann, will conduct a formal review of each appraisal report to ensure that the employed methodologies, analysis and calculations are correct and in compliance with USPAP reporting requirements. An independent appraisal review report will be produced, stating the reviewer’s process, findings, and confirmation of the determined highest and best use and calculation of fair market value.

Vaughn will work directly with the appraiser to discuss and resolve any errors or issues, before ultimately issuing a Review Certificate and Statement of Just Compensation.

Waiver Valuations. Where possible, Monument will work with the City to determine if the use of a Waiver Valuation may be appropriate for any uncomplicated easements or TCEs with an anticipated value below $15,000. Waiver Valuations allow for an efficient and cost effective alternative to appraisal reports, helping public agencies conserve valuable time and project funding resources. Monument’s internal valuation staff have a deep understanding of local real estate markets and appraisal principles, and are highly qualified to develop and produce Waiver Valuations to Caltrans standards. 2 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 77 Furniture, Fixtures & Equipment and Goodwill Appraisals. Monument has included specialty appraisers Marcus Pigrom and Ricardo Goni of Desmond, Marcello, and Amster (DMA) to provide Goodwill and FF&E appraisals, which may be necessary to value the assets and goodwill of any potentially impacted businesses. Monument will coordinate with DMA and City staff to assign and manage specialty appraisals, as needed. All FF&E and Goodwill appraisals will be prepared in accordance with URA, USPAP, and Caltrans Right-of-Way Manual guidelines.

PHASE 1 & 2 ENVIRONMENTAL SITE ASSESSMENTS
Monument has teamed with local experts, Blackburn Consulting, to provide the City with quality environmental services. Blackburn will provide environmental investigation services to evaluate the likelihood that potentially hazardous materials have impacted the soil or groundwater beneath the site, and evaluate the need for further site investigation if recognized environmental conditions (RECs) are identified.

Phase 1 environmental investigations determine the environmental condition of the properties being acquired—including site and area reconnaissance, regulatory database radius searches, historical reviews, land title and environmental lien search reports, reviewing regional geology and hydrology.

Blackburn will prepare a written report that includes a summary of the procedures used, relevant findings, and conclusions addressing recognized environmental conditions and their potential to adversely impact the site, and recommendations for further assessments at the site.

Phase 2 environmental investigations determine the environmental conditions of properties being acquired—including scoping and completing any subsurface investigation, site investigation, sampling, and sample testing. Blackburn will then prepare a written report that includes a summary of the sampling methodology, results, and (if applicable) recommendations for further action..

TITLE AND ESCROW SERVICES
Monument will obtain and review all requested Preliminary Title Reports to identify encumbrances and liens, and advise on any title issues that may impact the acquisition process. Upon acceptance and execution of offers, signed documents will be delivered to the title company to begin the escrow process. Settlement Statements will be produced which will allow the City to process funds and deposit them into escrow. For partial fee acquisitions and permanent easements, all required lender consents or subordination agreements will be obtained in order to transfer clean title. The City will receive final closing packages and title insurance policies immediately following the completion of each escrow.

ACQUISITION
Led by Lead Agent, Taylor Running, Monument’s agents will work closely with City staff to identify impacted property owners, develop offer package documents, and acquire all property rights in strict compliance with the URA and Caltrans Right-of-Way Manual. Specifically, Monument will:
• Coordinate and manage the acquisition process with the City and its legal counsel, along with the design team, property owners and appraisers to ensure effective cross-discipline communications.
• Review right-of-way plans, appraisal reports, title reports, appraisal maps, legal descriptions and all other pertinent documents.
• Prepare acquisition offer packages consisting of the City’s written purchase offer, appraisal summary statement, acquisition brochure, acquisition agreement, conveying instruments 3 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 78 (Grant Deeds, Permanent or Temporary Easements, etc.), Certificate of Acceptance, plat maps and legal descriptions, and Title VI Information.
• Deliver each First Written Offer within 15 days of receipt of approved appraisals. • Meet with each property owner to present the City’s purchase offer, explain the project’s goals and requirements, and inform them of the acquisition process. • Negotiate personally in good faith with each property owner, their agent or representative for a minimum of 45 days and discuss the valuation of the property interests, gather information for consideration and address any questions or concerns. • Establish and maintain an acquisition file for each property owner or property interest acquired. • As may be required, secure Right of Entry (ROE) agreements, Permits to Enter and Construct (PTECs), licenses or permits from property owners to perform hazardous waste, archaeological and other inspections.
• Promptly transmit executed documents (acquisition agreements, executed deeds, etc.) to the City for acceptance and processing. A report summarizing the pertinent information relative to the transaction will be included.
• Escrow Coordination – Coordinate opening of escrows, assist the escrow company in obtaining additional documentation as necessary to provide clear title to the City, supervise and review the closing of escrows, and review closing statements for completeness and accuracy. We will serve as liaison between the title company, escrow holder, and the City. • Prepare and submit a Letter of Recommendation to the City for any proposed administrative settlements, including a chronology of the negotiation efforts, any supporting evidence and documentation, and an analysis of the recommendation • If needed, recommend condemnation action when negotiations have reached an impasse.

Required justification will be submitted, along with our strategy to continue working towards an agreement during the condemnation process.
• Perform any other normal procedures to implement the acquisition assignment and provide any other supporting information and/or correspondence required by the City. • Provide bilingual acquisition agents, as needed.
• If necessary, provide search and identification services, along with feasibility studies and cost estimates for required replacement sites or mitigation areas.

Condemnation Support. In the event that negotiations are unsuccessful and the City has determined that an administrative settlement is not feasible, Jennifer Cole will support the City’s legal counsel throughout the condemnation process by preparing resolution hearing notices, providing copies of acquisition files and backup documentation, and assisting in the eminent domain complaint and trial preparation, as requested. Jennifer will also be available to provide expert witness testimony, if needed, and support any ongoing settlement negotiations that may occur prior to and during trial, including alternative dispute resolutions and negotiations for Stipulated Use and Possession to assure access to the property for project use.

RELOCATION SERVICES
If necessary, Monument will implement a Relocation Assistance Program (RAP) to ensure that displaced individuals and businesses receive prompt relocation benefits and advisory services in accordance with all Federal, State, and local regulations, and the Caltrans Right-of-Way Manual, as applicable.

Monument has facilitated the relocation of thousands of businesses and residences, and we excel at providing professional, compliant services while carrying out the relocation process with thoughtful 4 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 79 consideration of the needs of the impacted displacees. As needed, we will prepare all required Relocation Impact Documents and Replacement Housing Valuations to ensure that the Project is in compliance with regulatory standards, and create and conduct outreach programs to properly inform and counsel impacted residents and communities. Upon Project commencement, Monument’s agents, led by Taylor Running, will meet personally with each displacee to conduct an initial interview and collect documentation, inform them of their right to benefits, and explain the relocation process. We will then prepare a Notice of Eligibility detailing benefit amounts that will be submitted to the City for review and approval. Monument will conduct appropriate searches for relocation replacement sites and provide relocation site referrals to displacees and personally inspect replacement dwellings and/or buildings and sites to determine if they meet decent, safe, and sanitary regulatory requirements. Where appropriate, we will advise displacees of available economic assistance and social services; and provide displacees with referrals to organizations, social service agencies and community organizations.

Although not expressly requested as part of the required Scope of Work, based on our understanding of the City’s anticipated project needs, Monument has the ability to provide the following additional tasks and professional services should the need arise.

PROPERTY MANAGEMENT
Interim property management and security services will be available to the City for all assigned projects. Once a property is vacated, our Property Management Manager, Curtis Bibolet, will make recommendations as to interim leasing of properties or securing sites ahead of construction. Typical activities include: initial property inspection, board-up and securing of property perimeter, interim leasing and rent collection, establishment of trust accounts for collected rents and deposits, graffiti and nuisance abatement, utility payments and account maintenance, and hazardous materials testing and remediation. Monument will provide all required services for any vacant or occupied properties that are acquired as a part of the City’s assigned projects.

CALTRANS RIGHT-OF-WAY CERTIFICATION
The final step in the right-of-way process for federally-funded projects is the Right-of-Way Certification approval, which documents that the construction project is ready for advertising. During this process, Monument will coordinate and attend certification planning activities and meet with the City, Caltrans Right-of-Way, Local Assistance staff, and the project partners to determine project requirements and the certification level required to meet the project construction schedule. Monument will coordinate with the project engineer, utility relocation, acquisition, and right-of-way engineering managers to ensure their respective activities have been completed in compliance with applicable policy and certification requirements.

Monument will assist the City in the preparation of the submittal package that will include the certification form and compilation of the necessary back-up documents. This would generally include deeds, resolutions of necessity, final orders of condemnation, access agreements, cooperative agreements, permits, utility relocation agreements and notices, utility relocation plans, among other documents.

ADDITIONAL OPTIONAL SERVICES
5 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 80 EXCESS LAND DISPOSITION
Monument will identify potential excess land for planning purposes and prepare a Staff Report for City approval. We will follow the California Government Code Section 54220 as well as the City’s Policies and Procedures when offering the property for sale. The steps include:
• Develop a legal description and plat of the excess area • Appraise the excess land to determine its highest and best use and minimum value for sale. • Prepare a resolution for the City Council to approve declaring the area as excess and available for sale.
• Per Gov. Code 54220, reach out to various governmental agencies to determine if they are interested in purchasing the excess land at the appraised value. • If governmental agencies are not interested, then expose the excess land to the open real estate market via a standard “For Sale” process, or request for bid. • The “For Sale” process includes marketing the land via local MLS service or other tool, publishing the sale in local periodicals, and placing a sign on the property. The sale would be to the most responsible offer received within a given timeframe. • The request for bid process includes marketing the property and receiving bids on a specific day. On that day, open bids and award to the highest responsible bidder. • Work with the City attorney to draft a sales agreements and closing the property through escrow.
6 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 81 As demonstrated throughout our proposal, Monument
is dedicated to providing outstanding right-of-way
and related services to support the City with their
upcoming right-of-way needs. Our ever-growing team
is composed of the most experienced and innovative
professionals in the right-of-way industry, many of
whom have previously worked directly with the City. To
summarize a handful of our strengths:

CLOSING HIGHLIGHTS
We are committed to continuing to provide the highest level of service to the City. Through our collective experience and industry expertise, we believe that we are fully qualified to support the ongoing growth and success of the City’s infrastructure projects. Thank you for your consideration and for the opportunity to submit this proposal. We look forward to working with you.

OUTSTANDING LEADERSHIP
Principal in Charge, Bob Morrison, and
Project Manager, Jennifer Cole, are
local industry experts and are currently
supporting the City on several projects.

WEST SACRAMENTO EXPERIENCE
We have extensive experience working with the City on
projects including the Riverfront Street Extension Project, the I Street Bridge Replacement Project, and the South
Riverwalk Extension Project.

RESOURCES
Our depth of trained and qualified managers, agents and subconsultants are readily available to support all of the City's upcoming assignments, regardless of size. 7 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 82 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28

EXHIBIT B
Schedule of Performance
Contract Start Date June 18, 2025
Contract End Date June 17, 2028
83 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28

EXHIBIT C
Schedule of Fees
84 PROPOSAL FOR ON-CALL RIGHT-OF-WAY SERVICES
City of West Sacramento
RFQ #25-010-RFQ
SUBMITTED APRIL 8, 2025

PREPARED FOR

CITY OF WEST

SACRAMENTO
Attn: Dagoberto Fierros
Senior Analyst
1110 West Capitol Avenue
West Sacramento, CA 95691

PREPARED BY

MONUMENT
3626 Fair Oaks Blvd.

Suite 100
Sacramento, CA 95864
Ph: 800.577.0109
monumentrow.com
D. COST PROPOSAL
85 MONUMENT
2025 HOURLY RATE SCHEDULE

RIGHT-OF-WAY MANAGEMENT & IMPLEMENTATION
Principal $ 345.00 /hr
Project Director $ 275.00 /hr
Program Manager $ 255.00 /hr
Senior Project Manager $ 245.00 /hr
Project Manager 2 $ 220.00 /hr
Project Manager 1 $ 190.00 /hr
Senior Acquisition Agent / Senior Relocation Agent / Senior Analyst $ 165.00 /hr Acquisition Agent 2 / Relocation Agent 2 / Property Manager $ 145.00 /hr Acquisition Agent 1/ Relocation Agent 1 $ 135.00 /hr
Senior Project Coordinator $ 150.00 /hr
Project Coordinator 2 $ 135.00 /hr
Project Coordinator 1 $ 125.00 /hr
Senior Project Analyst $ 165.00 /hr
Project Analyst 2 $ 150.00 /hr
Project Analyst 1 $ 125.00 /hr
Researcher $ 105.00 /hr

PROJECT SUPPORT / ADMINISTRATIVE
Professional Staff $ 100.00 /hr
Project Controller 2 $ 120.00 /hr
Project Controller 1 $ 90.00 /hr
Project Support Specialist 3 $ 110.00 /hr
Project Support Specialist 2 $ 100.00 /hr
Project Support Specialist 1 $ 90.00 /hr

OTHER DIRECT COSTS
Phase 1 & 2 Environmental Services AT COST
Preliminary Title Reports AT COST
Appraisals AT COST
Appraisal Reviews AT COST
In the event Monument is required to
perform any act in relation to litigation
arising out of any project with the
Client (for example, expert consulting,
responding to a complaint, or proceeding
with discovery and trial), such services
are not part of this contract, nor are they
part of our normal fees. If required, these
types of services will be invoiced at two
times the regular hourly rates.

In the event this contract extends twelve
(12) months beyond the initial date of
execution, the hourly rates and any
remaining amount in the contract shall be
adjusted upwardly by five percent (5%)
per annum, compounded annually, on the
anniversary date of this contract.

Written communication services in
other languages would be an additional
cost and would be billed separately
based on quoted hourly rates by
independent translation services. Verbal
communication in Spanish, if necessary,
will be included at no additional charge.

Monument will submit monthly invoices
for the professional and trade services
rendered based on the hourly rate
schedule provided above. The client shall
promptly pay the uncontested amount
due within no more than thirty (30) days
after receipt of invoice. Upon completion
of services, the remaining unbilled
amount of the project balance shall
become immediately due and payable.

Sub-Consultant pass through costs/
budgets are subject to change based
on the timing of the work performed.

The Fees provided are based on the
best information available at the time
of the proposal.
1 CITY OF WEST SACRAMENTO | Proposal for On-Call Right-of-Way Services 86 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28

EXHIBIT D
CERTIFICATE OF COMPLIANCE WITH LABOR CODE § 3700
[Labor Code § 1861]
I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract.

CONSULTANTS
By:

Connor McDonald, Principal
87 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28

EXHIBIT D

LABOR COMPLIANCE

1. PREVAILING WAGE
A. The Work contemplated herein constitutes a public work within the meaning of Labor Code sections 1720 and 1771. It shall be mandatory upon the Consultant and upon any Subcontractor, to pay not less than the said specified prevailing rates of wages to all workers employed by them under the Contract in accordance with Labor Code section 1774. The Director of the Department of Industrial Relations ("DIR") of the State of California has determined the general prevailing rate of wages of per diem wages in the locality in which the work is to be performed for each craft or type of worker needed to execute the Contract. The Consultant acknowledges that it has examined the prevailing rate of per diem wages as established by the DIR. Copies of the current schedules for prevailing wages are on file at City Hall, and the contents of those schedules are incorporated herein as if set forth in full. The Consultant shall post a copy of the applicable prevailing wage determinations at each job site, along with any other work place posters required by law.

B. The City will not recognize any claims for additional compensation because of the payment of prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in determining its proposal, and will not under any circumstances be considered as the basis of a claim against the City.

C. By executing this Contract Consultant warrants that it has registered with the Department of Industrial Relations in accordance with Labor Code section 1725.5.

2. PREVAILING WAGE RECORDS
A. The Consultant and each subcontractor shall keep an accurate payroll record which shows the name, address, social security number, correct work classification (in accordance with the wage decision), both straight and overtime worked each day and week, and hourly rate of pay, gross wages earned, deductions made and net wages paid to each journeyman, apprentice, worker or other employee paid by the Consultant /subcontractor in connection with the Work. These payroll records shall be certified and shall be made available at Consultant's principal office. These records shall be maintained during the course of the Work. The Consultant and all subcontractors shall make the certified payroll records available for inspection by City representatives upon request and shall permit such representatives to interview employees during the work hours on the job site.

B. The City shall notify the Consultant in writing of any discrepancies or violations that are discovered during such inspections. Written notification pursuant to this Section shall include the actions that will be necessary to resolve the discrepancies and/or violations. The Consultant shall be held entirely responsible for the prompt resolution of all non-compliances with the prevailing wage laws, including those pertaining to all subcontractors and any lower-tier subcontractors. The Consultant shall forfeit as penalty to the City the amount specified by law for each calendar day or portion thereof for each worker (whether employed by the Consultant or any subcontractor) paid less than the stipulated prevailing rates for any work done under the Contract in violation of the provisions of the Labor Code and in particular, Section 1775.

C. To the extent applicable, Consultant and subcontractors shall maintain and furnish to the Department of Industrial Relations ("DIR"), a certified copy of each weekly payroll (but no less 88 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28
often than monthly), with a statement of compliance signed under penalty of perjury. Such certified payroll reports shall be transmitted electronically to the DIR.

D. The City will not recognize any claims for additional compensation because of the payment of the prevailing wages. The possibility of wage increases is one of the elements to be considered by the Consultant in entering into the Contract, and will not under any circumstances, other than delays caused by the City, or the City’s agents, be considered as the basis of a claim against the City.

3. Labor Discrimination
Attention is directed to Section 1735 of the Labor Code, which reads as follows:
“No discrimination shall be made in the employment of persons upon public works because of their race, color, national origin or ancestry, physical handicap, mental condition, marital status, or sex of such person, except as provided in Section 12940 of the Government Code, and every General Contractor for public works violating this section is subject to all the penalties imposed for a violation of this chapter.” 4 Eight-Hour Day Limitation
(a) In accordance with the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, incorporated herein by reference, eight hours labor shall constitute a day's work, and no worker in the employ of Consultant, or any Subcontractor, doing or contracting to do any part of the work contemplated by the Contract, shall be required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of those provisions; provided that subject to Labor Code Section 1815, a worker may perform work in excess of either eight (8) hours per day or forty (40) hours during any one week upon compensation for all hours worked in excess of eight (8) hours per day or forty (40) hours during any one week at not less than one and one-half times the basic rate of pay. (b) The Consultant and each Subcontractor shall also keep an accurate record showing the names and actual hours worked of all workers employed by them in connection with the Contract.

This record shall be open at all reasonable hours to the inspection of the City. It is hereby further agreed that, except as provided in (a) above, the Consultant shall forfeit as a penalty to the City the sum of twenty-five dollars ($25) for each worker employed in the performance of the Contract by the Consultant or by any of its Subcontractors for each calendar day during which such worker is required or permitted to labor more than eight (8) hours in and one calendar day and forty (40) hours in any one calendar week in violation of Sections 1810 through 1815.

5. Compliance with State Requirements for Employment of Apprentices (a) The Consultant's attention is directed to Section 1777.5 of the Labor Code.

Provisions of said Section pertaining to employment of registered apprentices are hereby incorporated by reference into this Contract. As applicable, the Consultant or any Subcontractor employed by the Consultant in the performance of this Contract shall take such actions as necessary to comply with the provisions of Section 1777.5.
89 Monument ROW, Inc.

CPA25-158 On-Call ROW Services
Expires on 06/17/28

EXHIBIT E

NOTICE TO PROCEED
90 1110 West Capitol Avenue
West Sacramento, CA 95691
(916) 617-4500
www.cityofwestsacramento.org
City of West Sacramento

NOTICE TO PROCEED
Date:

Requested by:

Managing Dept:

Task Start Date:

Completion Date:

The following information must be included on all invoices: (NTP# format: "Contract number-NTP01") • Contract #:
• NTP #:
• GL Cost Center(s):

Notice to Proceed is invalid unless fully executed
Requested by:

Dept Head approval:
____________________________________________________ Date: ______________ ____________________________________________________ Date: ______________ Finance Budget approval: ____________________________________________________Date: ______________ Over $10k also requires City Manager Approval
City Manager Approval: _________________________________________________ Date: ______________ Amanda Berlin, Assistant City Manager
Vendor Name:

Vendor Address:

Contact Name:

Contact Info:

Project Name:

Not-to-Exceed Amount:

Description of Services:
013024
Please specify amount
per cost center for PO setup
☐Change to previous NTP.

Amount of Increase or Decrease:
91 CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 6
CONSIDERATION OF ADOPTION OF RESOLUTION 25-75 REGARDING THE

EMERGENCY CONTRACT AND AWARD OF A PROFESSIONAL SERVICES CONTRACT WITH ACCO ENGINEERED SYSTEMS, INC. FOR THE COMMUNITY CENTER HVAC PROJECT (CIP 52083)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ X ] Staff
[ ] Other
Jamie Teske, Senior Project Manager
Capital Projects Department
ATTACHMENT [ x ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to adopt Resolution 25-75 regarding the Emergency Contract and award the Emergency Contract with ACCO Engineered Systems, Inc. for the Community Center HVAC System Repair Project occurring at the Community Center located at 1075 West Capitol Avenue.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Find that Community Center HVAC Repair project is exempt from CEQA analysis under CEQA Guidelines 15269. According to the CEQA Guidelines, an emergency includes emergency repairs to public or privately owned service facilities necessary to maintain service essential to the public health, safety, or welfare;
2) Adopt, by a minimum four-fifths vote of the Council, Resolution 25-75, regarding the Emergency Contract with ACCO Engineered Systems, Inc. for the Community Center HVAC Repair Project; 3) Approve the contract with ACCO Engineered Systems, Inc. to provide emergency HVAC repair services at the West Sacramento Community Center;
4) Authorize the City Manager or designee to execute an emergency contract for services in an amount not to exceed $35,099.00 with approval from the City Attorney; 5) Authorize the City Manager or designee to execute amendments or change orders on the contract; 6) Authorize the City Manager or designee to execute non-substantive changes and modifications, with approval from the City Attorney; and
7) Authorize the City Manager or designee to extend the contract term and adjust compensation, within the limits of the Council-approved budget.

BACKGROUND
Opposite City Hall Galleria in the heart of the Civic Center District, the Community Center located at 1075 West Capitol Ave. is an integral City facility operated by the Parks and Recreation Department. Construction of the facility was completed in late 2010 and the building went into service in 2011.

The three-story structure houses a multitude of recreation opportunities for multiple generations. During weekday hours the facility is busy with Active Aging programs for seniors ranging from crafts to wellness activities. The facility hosts after-school enrichment classes, and its various-sized meeting rooms are the setting of community rentals ranging from professional workshops and board meetings to graduations and celebrations of life. The West Sacramento Historical Society maintains a museum-quality exhibit space illustrating the City’s history. The arts are alive within the building's rotating visual art exhibits within Gallery 1075 and a rentable Black Box Theater where community, regional, and professional performances are staged.

As the building enters its 15th year of operation, many major components are reaching the end of their useful life—most notably the HVAC system. In recent years, the system has experienced multiple significant failures.

As a result, at the FY 2024/25 Mid-Term Budget Adoption on August 21, 2024, Capital Improvement Program (CIP) Project No. 52083 was established to re-design and replace the building’s HVAC system. On May 28, 2025, the HVAC unit serving the second floor (excluding the Black Box Theater) suffered a critical failure due to tubing and joint issues, resulting in a complete loss of refrigerant and rendering the system inoperable. This has created an unconditioned environment for the impacted spaces.

City staff made multiple attempts to restore the failed HVAC unit; however, due to the unit's age and obsolescence, all efforts were unsuccessful. Temporary HVAC units have been deployed to maintain functionality of the affected spaces until repairs can be completed under an emergency contract. To identify an 92 Community Center HVAC Emergency Repair Project
June 18, 2025

Page 2 ends

interim solution, staff consulted with Norman S. Wright and ACCO Engineered Systems, Inc. Due to the unavailability of replacement units, caused by the units being obsolete, repairs are the only viable short-term option. ACCO conducted a site visit, performed diagnostics on the failed units, and confirmed staff’s assessment.

ANALYSIS
For the purposes of contracting, Section 1102 of the Public Contract Code (PCC) defines an emergency as “a sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate action to prevent or mitigate the loss or impairment of life, health, property, or essential services.” PCC 20168 allows cities to enter into no-bid emergency construction contracts following the procedure set out in PCC22050. PCC 22050 allows a city to delegate this authority to a non-elected public official. West Sacramento Municipal Code 3.04.090 delegates this authority to the “purchasing agent”, which is elsewhere defined as the City Manager.

Once the contract has been approved, the City Manager is required to report on the contract at the next City Council meeting (PCC 22050(b)(3)). If the work is continuing, the Council needs to authorize continuing the work by a 4/5 vote (PCC 22050(c)(2)). Because the work involved in the emergency repair may extend beyond the June 18, 2025, City Council meeting, the Council is asked to adopt a resolution allowing the work of the contractor to continue. Resolution 25-75, allowing the work of the contractor to continue beyond the June 18, 2025, Council meeting, is attached. The resolution must be approved by a minimum four-fifths vote of the Council for the work to continue.

Environmental Considerations
This emergency repair is exempt from CEQA analysis under CEQA Guidelines 15269. According to the CEQA Guidelines, an emergency includes emergency repairs to public or privately owned service facilities necessary to maintain service essential to the public health, safety, or welfare.

Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
The Council’s primary alternatives are summarized below:
1) Approve the recommended actions as stated above.
2) Delay or revise the recommended actions.
3) Not approve the recommended actions.

Alternatives 2 and 3 are not recommended as the adoption of Resolution 25-75 is required for the contractor to complete the emergency work detailed in this report.

Coordination and Review
This report was prepared by the Capital Projects Department and coordinated with and reviewed by the Public Works Operations and Maintenance Department, Parks & Recreation Department, Finance Department, and the City Attorney.

Budget/Cost Impact
The emergency work identified in this report is not eligible for reimbursement by YCPARMIA. Capital Improvement Project (CIP) 52083 has been created for the HVAC System Replacement at the Community Center and will be utilized to fund the emergency repairs.

ATTACHMENTS
1) Notice of Exemption (CEQA)
2) Resolution 25-753)
93 94
ATTACHMENT 2
RESOLUTION 25-75

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO

REGARDING CONTINUANCE OF THE EMERGENCY CONTRACT WITH ACCO ENGINEERED SYSTEMS, INC. FOR THE COMMUNITY CENTER HVAC EMERGENCY

REPAIR PROJECT AND RELATED BUDGET APPROPRIATIONS
WHEREAS, on May 28, 2025, the Community Center lost the entire HVAC systems supporting the second-floor operations; and
WHEREAS, City staff discovered that the HVAC system at the Community Center had completely failed due to age and obsolescence; and
WHEREAS, City staff contacted ACCO Engineered Systems, Inc., for repair services, to assess the damages and provide an estimate for repair; and WHEREAS, ACOO Engineered Systems, Inc. determined due to the unavailability of replacement units, caused by the units being obsolete, repairs are the only viable short-term option;
WHEREAS, City staff requested a estimate for the HVAC system repairs from ACCO Engineered Systems, Inc.;
WHEREAS, City staff selected ACCO Engineered Systems, Inc, to perform the repairs under an emergency contract; and
WHEREAS, for the purposes of contracting, Section 1102 of the Public Contract Code (PCC) defines an emergency as "a sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate action to prevent or mitigate the loss or impairment of life, health, property, or essential public services”; and
WHEREAS, PCC 20168 allows cities to enter into no-bid, emergency construction contracts following the procedure set out in PCC 22050; and WHEREAS, PCC 22050 allows a city to delegate this authority to a non-elected public official and West Sacramento Municipal Code 3.04.090 delegates this authority to the “purchasing agent”, which is elsewhere defined as the City Manager; and WHEREAS, once the emergency contract has been approved, the City Manager is required to report on the contract at the next City Council meeting (PCC 22050(b)(3)); and WHEREAS, if the work is continuing, the Council needs to authorize continuation of the work (PCC 22050(c)(2)); and WHEREAS, because the work involved in the emergency repair will likely take several weeks, the work may extend beyond the June 18, 2025, City Council meeting, Council needs to authorize continuation of the work.

WHEREAS, the City Council has considered all information related to this matter, as presented at the public meetings of the City Council identified herein, including any supporting reports by City staff, and any other information provided during public meetings. 95 Resolution 25-75

Page 2 ends

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of West Sacramento as follows:

1. The City Council hereby finds there is a need to allow continuance of the work to complete the emergency repairs as described in the contract with ACCO Engineered Systems, Inc., beyond June 18, 2025.

2. The City Council hereby finds that the facts set forth in the recitals to this Resolution are true and correct and establish the factual basis for the City Council’s adoption of this Resolution.

3. This Resolution shall take effect immediately upon its adoption.

PASSED AND ADOPTED by the West Sacramento City Council this 18th day of June, 2025 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Guerrero, Mayor
ATTEST:

Jennifer Cusmir, City Clerk
96 CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 7
CONSIDERATION OF ADOPTION OF RESOLUTION 25-74 REGARDING THE

EMERGENCY CONTRACT AND AWARD OF A CONSTRUCTION CONTRACT WITH

SUBZERO HVAC SERVICES FOR THE POLICE DEPARTMENT HVAC EMERGENCY INSTALLATION PROJECT (CIP 50004)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ X ] Staff
[ ] Other
Jamie Teske, Senior Project Manager
Capital Projects Department
ATTACHMENT [ x ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to adopt Resolution 25-74 regarding the Emergency Contract and award a Construction Contract with SubZero HVAC Services for the Police Department HVAC Emergency Installation Project occurring at the Police Department located at 550 Jefferson Blvd.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Find that Police Department HVAC Emergency Installation project is exempt from CEQA analysis under CEQA Guidelines 15269. According to the CEQA Guidelines, an emergency includes emergency repairs to public or privately owned service facilities necessary to maintain service essential to the public health, safety, or welfare;
2) Adopt, by a minimum four-fifths vote of the Council, Resolution 25-74, regarding the Emergency Contract with SubZero HVAC Services for the Police Department HVAC Emergency Installation Project; 3) Approve the contract with Subzero HVAC Services to provide HVAC installation services at the City of West Sacramento Police Department;
4) Authorize the City Manager or designee to execute an emergency contract for services in an amount not to exceed $18.653.00 with approval from the City Attorney; 5) Authorize the City Manager or designee to execute amendments or change orders up to 10-15% of the contract;
6) Authorize the City Manager or designee to execute non-substantive changes and modifications, with approval from the City Attorney; and
7) Authorize the City Manager or designee to extend the contract term and adjust compensation, within the limits of the Council-approved budget.

BACKGROUND
The Police Department’s IT server room houses critical infrastructure that supports daily operations, communications systems, data storage, and public safety software. Maintaining appropriate environmental conditions, specifically cooling, is essential to ensuring uninterrupted service and preventing equipment failure.

Recently, the server room has experienced elevated temperatures due to insufficient cooling capacity. This rise in heat levels poses a serious risk to the stability and performance of the IT systems. Without immediate intervention, there is potential for system overheating, data loss, and disruption to essential public safety functions. To mitigate this risk, staff has placed temporary cooling units inside the server room as an immediate measure to stabilize temperatures and protect critical equipment.

Staff reached out to multiple vendors regarding the installation of a dedicated cooling unit and selected Sub Zero HVAC Services for the emergency installation based on their ability to respond quickly and meet the project requirements.

ANALYSIS
For the purposes of contracting, Section 1102 of the Public Contract Code (PCC) defines an emergency as “a sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate action to prevent or mitigate the loss or impairment of life, health, property, or essential services.” PCC 20168 allows cities to enter into no-bid emergency construction contracts following the procedure set out in PCC22050. PCC 22050 allows a city to delegate this authority to a non-elected public official. West Sacramento Municipal Code 3.04.090 delegates this authority to the “purchasing agent”, which is elsewhere defined as the City Manager. 97 Police Department HVAC Emergency Installation Project June 18, 2025

Page 2 ends

Once the contract has been approved, the City Manager is required to report on the contract at the next City Council meeting (PCC 22050(b)(3)). If the work is continuing, the Council needs to authorize continuing the work by a 4/5 vote (PCC 22050(c)(2)). Because the work involved in the emergency repair may extend beyond the June 18, 2025, City Council meeting, the Council is asked to adopt a resolution allowing the work of the contractor to continue. Resolution 25-74, allowing the work of the contractor to continue beyond the June 18, 2025, Council meeting, is attached. The resolution must be approved by a minimum four-fifths vote of the Council for the work to continue.

Environmental Considerations
This emergency repair is exempt from CEQA analysis under CEQA Guidelines 15269. According to the CEQA Guidelines, an emergency includes emergency repairs to public or privately owned service facilities necessary to maintain service essential to the public health, safety, or welfare.

Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
The Council’s primary alternatives are summarized below:
1) Approve the recommended actions as stated above.
2) Delay or revise the recommended actions.
3) Not approve the recommended actions.

Alternatives 2 and 3 are not recommended as the adoption of Resolution 25-74 is required for the contractor to complete the emergency work detailed in this report.

Coordination and Review
This report was prepared by the Capital Projects Department and coordinated with and reviewed by the Public Works Operations and Maintenance Department, Parks & Recreation Department, Finance Department, and the City Attorney.

Budget/Cost Impact
The emergency work identified in this report is not eligible for reimbursement by YCPARMIA. Capital Improvement Project (CIP) 50004 has been created for the HVAC System Replacement at the Police Department will be utilized to fund the emergency repairs.

ATTACHMENTS
1) Notice of Exemption (CEQA)
2) Resolution 25-74
98 99
ATTACHMENT 2
RESOLUTION 25-74

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO

REGARDING CONTINUANCE OF THE EMERGENCY CONTRACT WITH SUB ZERO HVAC

SERVICES FOR THE POLICE DEPARTMENT HVAC EMERGENCY REPAIR PROJECT AND

RELATED BUDGET APPROPRIATION
WHEREAS, on June 2, 2025, the Police Department IT Server Room started experiencing higher temperatures; and
WHEREAS, City staff identified that the existing HVAC system was no longer sufficient to meet the cooling demands of the IT server room due to the increased equipment load, and determined that additional cooling capacity was necessary to maintain proper operating conditions;
WHEREAS, City staff contacted multiple vendors to assess the IT server room issues and provide an estimate; and
WHEREAS, City staff selected Sub Zero HVAC Services, to perform the installation under an emergency contract; and
WHEREAS, for the purposes of contracting, Section 1102 of the Public Contract Code (PCC) defines an emergency as "a sudden, unexpected occurrence that poses a clear and imminent danger, requiring immediate action to prevent or mitigate the loss or impairment of life, health, property, or essential public services”; and
WHEREAS, PCC 20168 allows cities to enter into no-bid, emergency construction contracts following the procedure set out in PCC 22050; and WHEREAS, PCC 22050 allows a city to delegate this authority to a non-elected public official and West Sacramento Municipal Code 3.04.090 delegates this authority to the “purchasing agent”, which is elsewhere defined as the City Manager; and WHEREAS, once the emergency contract has been approved, the City Manager is required to report on the contract at the next City Council meeting (PCC 22050(b)(3)); and WHEREAS, if the work is continuing, the Council needs to authorize continuation of the work (PCC 22050(c)(2)); and WHEREAS, because the work involved in the emergency repair will likely take several weeks, the work may extend beyond the June 18, 2025, City Council meeting, Council needs to authorize continuation of the work.

WHEREAS, the City Council has considered all information related to this matter, as presented at the public meetings of the City Council identified herein, including any supporting reports by City staff, and any other information provided during public meetings.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of West Sacramento as follows:

1. The City Council hereby finds there is a need to allow continuance of the work to 100
Resolution 25-74

Page 2 ends

complete the emergency repairs as described in the contract with Sub Zero HVAC Services beyond June 18, 2025.

2. The City Council hereby finds that the facts set forth in the recitals to this Resolution are true and correct and establish the factual basis for the City Council’s adoption of this Resolution.

3. This Resolution shall take effect immediately upon its adoption.

PASSED AND ADOPTED by the West Sacramento City Council this 18th day of June, 2025 by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Martha Guerrero, Mayor
ATTEST:

Jennifer Cusmir, City Clerk
101

CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 8
SUBJECT:

CONSIDERATION OF APPROVAL OF CONTRACT AMENDMENT NO. 5 WITH CONSOR NORTH AMERICA, INC. FOR THE SYCAMORE TRAIL EXTENSION PHASE II PROJECT (CIP 14021)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [X] Staff
[ ] Other
Christian Asuncion, Associate Engineer
Ryan Teves, Senior Engineer
Capital Projects Department
ATTACHMENT [X] Yes [ ] No [ ] Information [ ] Direction [X] Action

OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to approve Contract Amendment No. 5 of the professional services contract with Consor North America, Inc. (Consor) for construction management services for the Sycamore Trail Extension Phase II Project (CIP 14021).

RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Approve and authorize the City Manager, or his designee, to execute Amendment No. 5 to the construction management contract with Consor in the amount of $250,000 for the Sycamore Trail Extension Phase II Project;
2) Authorize the City Manager or his designee to execute amendments or change orders up to 10% of the contract amendment amount ($25,000);
3) Authorize the City Manager to execute non-substantive changes or modifications, with approval from the City Attorney; and
4) Authorize the City Manager or his designee to execute amendments to further extend the term of the contract, if necessary.

BACKGROUND
On May 23, 2022, staff solicited proposals for construction management services through a Request for Proposals (RFP) and received four proposals. After reviewing Consor’s qualifications, experience, and proposed work plan, the staff selection panel determined that Consor has a strong understanding of the work to be performed and is the most qualified firm to provide the construction management services. The contract was awarded by the City Council on the August 3, 2022, meeting. Amendment No. 1 to the contract was made on February 28, 2023, to include subcontractor rate changes. Amendment No. 2 to the contract was made on November 18, 2024, to release previously approved contingency in the amount of $200,186 and extend the term of the contract to June 30, 2025, to continue providing construction support and project closeout. Amendment No. 3 to the contract was made on January 15, 2025, to increase the contract in the amount of $300,000 and extend the term of the contract to December 31, 2025. Amendment No. 4 to the contract was made on May 6, 2025, to release previously approved contingency in the amount of $45,000.

Pursuant to the Public Contract Code, the project was publicly advertised for construction on October 3, 2023.

The bids were opened on November 17, 2023, and staff determined Bridgeway Civil Constructors, Inc. to be the lowest, responsive, and responsible bidder. On February 2, 2023, the City Council awarded the construction contract to Bridgeway Civil Constructors, Inc. in the amount of $11,230,198.50.

ANALYSIS
Construction for the project is currently ongoing, with an anticipated completion in June 2025. There was a delay in the initial project completion due to production of the final elements of the work, including the picket fence panels. Consor has also been required to spend additional effort in managing the contractor and contracts, which includes implementing additional project focus meetings and responding to RFIs, letters, and notice of potential claims. As a result, Amendment No. 5 is requesting additional funds in the amount of $250,000 in order to complete construction support, project closeout, and dispute resolution support. 102
Contract Amendment No. 5 with Consor
June 18, 2025

Page 2 ends

Table 1 - Consor Contract Table
Previously Approved
Original Contract (8/3/2022) $1,334,573.06
Amendments Nos. 1 to 4 $ 545,186.00
Total $1,879,759.06
Amendment No. 5
Additional Requested Funds (pending) $250,000.00
New Contract Total $2,129,759.06
Environmental Considerations
On August 22, 2018, the City Council adopted the Final Initial Study/Mitigated Negative Declaration and Mitigation Monitoring and Reporting Program for the Project with Resolution 18-51. As the project has not been modified since that time, no new environmental analysis is required, consistent with State CEQA Guidelines Section 15162 and 15168(c)(2).

Commission Recommendation
Not applicable
Strategic Plan Integration
Not applicable
Alternatives
Staff recommends that the City Council:
1) Approve the recommended actions as stated above.
2) Modify or defer the recommended actions.
3) Elect not to proceed with the contract for professional services with Consor North America, Inc.

Alternative 1 is recommended to allow for further construction support and project closeout in compliance with grant milestone requirements.

Coordination and Review
This report was prepared by the Capital Projects Department with coordination and reviewed from the Finance Department.

Budget/Cost Impact
There is currently sufficient funding in the Capital Improvement Program (CIP) for the recommended action of this report and no additional funding is required or requested at this time.

ATTACHMENTS
1) Vicinity Map
2) Consor Contract Amendment No. 5
103
104
Consor North America, Inc.

CPC22-200 Sycamore Trail Phase II
Expires 12/31/2025
AMENDMENT NO. 5
to the

CONTRACT FOR SERVICES
between the

CITY OF WEST SACRAMENTO
And
CONSOR NORTH AMERICA, INC.

Dated August 3, 2022
This Amendment No. 5 to the Contract for Services between the City of West Sacramento (City) and Consor North America, Inc. (Consultant) dated August 3, 2022 for the Sycamore Trail Phase II Project, is made and entered into June 18, 2025. Except as expressly amended herein, the August 3, 2022 Contract for Services is in full force and effect.

RECITALS
WHEREAS, the City of West Sacramento and Quincy Engineering, Inc. executed a contract for services on August 3, 2022, for the Consultant to provide Construction Management services for the Sycamore Trail Phase II Project (Project); and WHEREAS, Quincy Engineering, Inc. was acquired and became a wholly owned subsidiary of Consor North America, Inc. in May 2019; and WHEREAS, The City and Consultant were informed that, in light of the corporate relationship between Consultant and Consor, the Agreement should have been by and between the City and Consor; and
WHEREAS, the City and Consultant amended the Agreement for the purpose of clarifying that said Agreement is by and between the City and Consor; and WHEREAS, a construction contract was awarded to Bridgeway Civil Constructors, Inc. on February 2, 2023 City of West Sacramento Council Meeting; and WHEREAS, Amendment No. 1 was executed February 28, 2023 to include the subcontractor rate changes; and
WHEREAS, Amendment No. 2 was executed November 18, 2024 to increase the contract in the amount of $200,186.00 and extend the term of the contract to June 30, 2025; and WHEREAS, Amendment No. 3 was executed January 15, 2025 to increase the contract in the amount of $300,000.00 and extend the term of the contract to December 31, 2025; and WHEREAS, Amendment No. 4 was executed May 6, 2025 to increase the contract in the amount of $45,000.00; and
WHEREAS, the City and Consultant desire to amend the said contract.

NOW, THEREFORE, IT IS MUTUALLY AGREED by parties hereto to amend the said agreement as follows:

I. COMPENSATION:

The compensation as set forth in the Contract for Services dated August 3, 2022, shall be increased as outlined in the proposal dated May 1, 2025, attached hereto as Exhibit A.

Compensation shall be increased by $250,000.00 to continue providing construction support and closeout and in no event shall total compensation exceed $2,129,759.06 without the City’s prior written approval.
105
Consor North America, Inc.

CPC22-200 Sycamore Trail Phase II
Expires 12/31/2025
II. REMAINING TERMS AFFECTED:

Except as expressly provided herein, nothing in this Amendment No.5 shall be deemed to waive or modify any of the other provisions of the Contract. In the event of any conflict between this Amendment No. 5 and the Contract, the terms of this Amendment No. 5 shall prevail.

IN WITNESS WHEREOF the parties hereto have executed Amendment No. 5 to the Agreement as the date herein set forth.

CITY OF WEST SACRAMENTO
By:

Amanda Berlin, Assistant City Manager
CONSOR NORTH AMERICA, INC.

By:

Ian Machan, Executive Vice President ([email protected])

APPROVED AS TO FORM
By:

Jeffrey Mitchell, City Attorney
ATTEST:

By: ________________________________________________________ Jennifer Cusmir, City Clerk
106
2868 Prospect Parkway Dr, Suite 250,
Rancho Cordova, CA 95670
May 1, 2025
City of West Sacramento
Ryan Teves, PE,
Senior Civil Engineer
1110 West Capitol Ave, 1st Floor
West Sacramento, CA 95691
RE: Request Amendment 5 for Construction Management and Inspection Services for the Sycamore Trail Project Phase II
Dear Mr. Teves,
As the City is aware, the Sycamore Trail Phase Project is significantly behind schedule. We have evaluated the project status and needs relative to the Consor budget for our professional services and respectfully request a budget increase.

We would like to officially a budget increase of $250,000 for a total not-to-exceed budget of $2,129,759.06 Current Not-to-Exceed budget, including amendment 4: $ 1,879,759.06 Amendment 5 Request $ 250,000.00
Total Not-to-Exceed Budget: $ 2,129,759.06
There are several factors which required Consor to send additional effort on this project and contributing to the request for additional funds a delay to the project completion and additional effort managing the general Contractor BCCI.

The delay to project completion.
• The best case scenario for project completion is May 6, 2025 at 177 working days past the contract completion date. Consor’s team has spent and will need to continue to spend additional efforts in the day-today management of the work, including inspection time, however we continue to strive to work efficiently and minimize the costs for this additional effort. The request for $250,000 includes full construction management services for March and April, plus budget for project closeout.

Consor has also been required to spend additional effort in managing the contractor and contract. • There is the hope of a global settlement and there have been promising conversations. However, at this time, there is no written outline or agreement towards a global settlement. Therefore we have budgeted $80,000 towards continued dispute resolution support.

If you have any questions, please contact me at (916) 298-8769, or my email at: [email protected]. We look forward to continuing our partnership on this important City project.

Sincerely,
Consor
Sherri Berexa, PE, QSP | Project Manager
107

CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 9
SUBJECT:

CONSIDERATION OF ADOPTION OF RESOLUTION 25-66 ESTABLISHING A LIST OF FISCAL YEAR 2025/26 PROJECTS FUNDED BY SENATE BILL 1 (SB1): THE ROAD

REPAIR AND ACCOUNTABILITY ACT
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [x] Staff
[ ] Other
Christian Asuncion, Associate Engineer
Capital Projects Department
ATTACHMENT [x] Yes [ ] No [ ] Information [ ] Direction [x] Action

OBJECTIVE
The objective of this report is to provide sufficient information to the City Council for it to adopt Resolution 25-66 establishing the Fiscal Year (FY) 2025/26 list of projects to be funded with the State Road Maintenance and Rehabilitation Account (RMRA/SB1) revenues and authorizing staff submission of the list to the California Transportation Commission (CTC).

RECOMMENDED ACTION
Staff respectfully recommends that the City Council adopt Resolution 25-66 establishing and approving the list of FY 2025/26 projects to be funded with the State Road Maintenance and Rehabilitation Account (RMRA/SB1) revenues and authorize staff to submit the list to the State of California Transportation Commission (CTC).

BACKGROUND
Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017, was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant statewide multi-modal transportation funding shortfalls. SB1 includes accountability and transparency provisions that will ensure the residents of California are aware of the projects proposed for funding in each community and which projects have been completed in each fiscal year. In order to comply with this provision, the City must annually establish a list of all projects proposed to receive funding from the Road Maintenance and Rehabilitation Account (RMRA) created by SB 1.

The list must include a description and the location of each proposed project, a proposed schedule for the project's completion, and the estimated useful life of the improvement.

Collection on this new funding source by the State began on November 1, 2017 and $6,828,206 in SB 1 funding and associated interest earnings has been allocated to the City as of FY 2023/24. The City is projected to receive an additional $1,386,773 by the end of FY 2024/25 and an additional $1,424,080 in FY 2025/26 (according to CaliforniaCityFinance.com). To receive the SB1 funds for FY 2025/26, the City must submit a list of projects, approved by the Council, to the State Transportation Commission (CTC) by July 1, 2025. If the City does not submit the list by the due date, funds may be redistributed to other agencies. 108
SB1 RMRA Project List
June 18, 2025

Page 2 ends

ANALYSIS
A detailed breakdown of estimated and actual SB1 revenues is provided by Table 1 below.

Table 1 – SB1 Revenues
SB1 Revenues1
Fiscal Year (FY),
July 1 to June 30 Estimated Actual YTD
2017/18 $198,833 $198,833
2018/19 $920,000 $930,177
2019/20 $957,566 $987,529
2020/21 $962,095 $957,943
2021/22 $1,053,674 $1,177,907
2022/23 $1,145,941 $1,178,287
2023/24 $1,297,327 $1,397,530
2024/25 $1,386,773 $1,283,088
2025/26 $1,424,080
Total $9,346,289 $8,111,294
The “Actual SB1 Expenditures” are detailed in Table 2 below.

Table 2 – SB1 Expenditures (Through FY 2024/25)
Project2 3 Actual SB1
Expenditure
Fiscal Year of
Expenditure
Pavement Management System (CIP 10046)* $50,000 2017-2018 State Streets Pavement Rehab Design (CIP 15042)* $100,000 2017-2018 2018 Pavement & Striping (CIP 15041)* $250,000 2017-2018 Targeted Traffic Operations Improvements (CIP 16011)* $100,000 2019-2020 State Streets Pavement Rehab (CIP 15042) $500,000 2019-2020 Southport Parkway Pavement Rehab Project (CIP15046) $250,000 2019-2020 Targeted Traffic Operations Improvements (CIP 16011)* $100,000 2020-2021 State Streets Pavement Rehab (CIP 15042) $1,500,000 2020-2021 State Streets Pavement Rehab (CIP 15042) $1,000,000 2021-2022 Southport to Harbor Roadway Project (CIP 15046) $250,000 2021-2022 State Streets Pavement Rehab (CIP 15042) $1,000,000 2022-2023 State Streets Pavement Rehab (CIP 15042) $1,000,000 2023-2024 State Streets Pavement Rehab (CIP 15042) $1,000,000 2024-2025 Pavement Preservation Project (CIP 17026) $1,000,000 2024-2025 Total $8,100,000
1 Actual revenues for 2024/25 include receipts through May 15, 2025. 2 An “Actual SB1 Expenditure” is defined as the transfer of SB1 funds from the SB1 Fund (Fund 203) to the specific project account in accordance with the Council-approved CIP SB1 appropriation for that project. 3 Those projects identified above with an asterisk (*) are completed projects. 109
SB1 RMRA Project List
June 18, 2025

Page 3 ends

The SB1 revenues through the end of FY 2024/25 are estimated at $7,922,209. The planned expenditures through FY 2024/25 are $8,100,000. If the actual revenues for previous fiscal years are added to the estimated revenues for FY 2025/26, the estimated revenues through FY 2025/26 are $9,416,396. The estimated total revenues ($9,416,396) less the amount already expended ($8,100,000), leave approximately $1,316,396 for future expenditures through FY 2025/26.

Table 3 illustrates the City’s current plan to expend both the current balance of SB1 funds and the funds within the identified project accounts for FY 2019/20 through FY 2024/25 and estimated future revenues to be received in FY 2025/26.

Table 3 – SB1 Expenditure Plan
Fiscal
Year (FY),
July 1 to
June 30
Pavement
Management
System
Update
(CIP 10046)
Port Area
Infrastructure &
Complete
Streets
(CIP 15046)
Pavement and
Striping
(CIP 15041)
State Streets
Pavement
Rehab
(CIP 15042)
Targeted Traffic
Operations
Improvements
(CIP-16011)
Pavement
Preservation
(CIP
17026/17029)
Total
2017/18 $50,000 $250,000 $100,000 $400,000
2019/20 $250,000 $500,000 $100,000 $850,000
2020/21 $1,500,000 $100,000 $1,600,000
2021/22 $250,000 $1,000,000 $1,250,000
2022/23 $1,000,000 $1,000,000
2023/24 $1,000,000 $1,000,000
2024/25 $1,000,000 $1,000,000 $2,000,000
2025/26
(Estimated) $1,000,000 $1,000,000
Total $50,000 $500,000 $250,000 $6,100,000 $200,000 $2,000,000 $9,100,000 The CTC SB1 Local Streets and Roads Program operates on a yearly fiscal cycle. In conformance with the provisions of the program, cities and counties are required to annually adopt a project list and resolution to secure eligible funds. Projects that carryover from year to year must be relisted on each year's project list, irrespective of prior annual approvals.

The recommended action does not appropriate funds to the projects. Appropriation of funds for FY 2025/26 will be requested through the current Capital Improvement Program budget process at which time the City has the flexibility to shift funds between projects and/or to appropriate funds to other projects that meet the SB1 criteria.

SB1 affords cities and counties flexibility to deviate from a project list in any given fiscal year should local priorities/circumstances change. Any deviations from a project list in a given fiscal year will be captured through the next annual expenditure report to the CTC.

Environmental Considerations
This action is not a project that is subject to CEQA because it is not an activity that may cause either a direct or reasonably foreseeable indirect physical change in the environment. (Pub. Resources Code, § 21065; CEQA Guidelines§§ 15060(c), 15378(a).) Each project identified herein will receive individual CEQA analysis and documentation during its development phase.

Commission Recommendation
N/A
Strategic Plan Integration
N/A
110
SB1 RMRA Project List
June 18, 2025

Page 4 ends

Alternatives
The Council may:
1) Approve the recommended action as stated above.
2) Approve the recommended action with modifications. Staff does not recommend modifications that will require staff to return to Council for approval as the deadline to submit an approved list to the CTC is July 1, 2025.
3) Council may choose to not approve the recommended action and the associated project list. Staff does not recommend this because failure to submit the list by July 1, 2025, may result in the loss of approximately $1,420,000 in SB1 funding for FY 2025/26.

Staff recommend Alternative 1 as Alternatives 2 and 3 may result in the loss of approximately $1,420,000 in SB1 funding for FY 2025/26 as the deadline to submit an approved list to the CTC is July 1, 2025.

Coordination and Review
This report was prepared by the Capital Projects Department, in coordination with and reviewed by the Finance Department.

Budget/Cost Impact
The City must submit the list of projects to be funded with State Road Maintenance and Rehabilitation Account (SB1) funds to the CTC by July 1, 2025. Failure to do so could result in the loss of approximately $1,420,000 in FY 2025/26 that the City could otherwise use to repair and maintain its streets.

ATTACHMENTS
1) Resolution 25-66
2) Vicinity Map
111
Attachment 1
RESOLUTION 25-66

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2025/26 FUNDED BY SB1:

THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017
WHEREAS, Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor, in April 2017, to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB1 includes accountability and transparency provisions that will ensure the residents of the City of West Sacramento are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of West Sacramento must annually adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA) created by SB1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and
WHEREAS, the City of West Sacramento intends to use the SB1 funds in accordance with the Road Repair and Accountability Act of 2017 and abide by the mandated eligibility and reporting requirements; and
WHEREAS, the City of West Sacramento, will receive an estimated $1,424,080 in SB1 funding in Fiscal Year 2025/26; and
WHEREAS, this is the ninth year in which the City of West Sacramento is receiving SB1 funding and this funding will enable the City of West Sacramento to continue essential road maintenance and rehabilitation projects, safety improvements, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB1; and
WHEREAS, the City of West Sacramento has undergone a public process to ensure public input into our community’s transportation priorities and the resultant project list; and WHEREAS, the City of West Sacramento used a Pavement Management System to develop the SB1 project list to ensure revenues are being used on the most high-priority and cost effective projects that also meet the community’s priorities for transportation investment; and WHEREAS, the funding from SB1 has helped and will continue to help the City of West Sacramento maintain and rehabilitate its streets and add active transportation infrastructure throughout the City; and
WHEREAS, the SB1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.

NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of West Sacramento, as follows:
112
Resolution 25-66

Page 2 of 2 ends

1. The foregoing recitals are true and correct.

2. The following list of a single project is funded partially or in whole with FY 2025/26 Road Maintenance and Rehabilitation Account (SB1) revenues. The following projects are being relisted from a previous year because it has not yet been completed and because it will be utilizing FY 2024/25 Road Maintenance and Rehabilitation Account revenues. With the relisting of this project in the adopted fiscal year resolution, the City is reaffirming to the public and the State its intent to fund this project partially or in whole with Road Maintenance and Rehabilitation Account (SB 1) revenues:
a) Project Title: States Streets Pavement Rehabilitation (CIP 15042) Originally listed: FY 2017/18
Description: Rehabilitate the local street network including pavement rehabilitation, ADA accessibility upgrades and storm drainage repairs.

Location: Limits of the project include the area bounded by Park Blvd, Stone Blvd, Jefferson Blvd and 15th Street
Estimated Useful Life: 10 years
Anticipated Project Schedule:

Phase 1 Construction: June 2024 - December 2025
b) Project Title: 2025 Pavement Preservation Project (CIP 17029) Description: Rehabilitate the local street network including preventative maintenance
Location: Limits of the project include the area bounded by Jefferson Blvd, Harbor Blvd, West Capitol Ave, and the Union Pacific Railroad; Enterprise Blvd; Harbor Blvd
Estimated Useful Life: 10 years
Anticipated Project Schedule:

Construction: June 2025 – December 2025
PASSED AND ADOPTED by the City Council of the City of West Sacramento, this 18th day of June 2025, by the following vote:

AYES:

NOES:

ABSENT:

Martha Guerrero, Mayor
ATTEST:

Jennifer Cusmir, City Clerk
113
Attachment 2
114

CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 10
SUBJECT:

CONSIDERATION OF RESOLUTION 25-64 CONSENTING TO THE
WITHDRAWAL OF RECLAMATION DISTRICT 537 FROM THE WEST

SACRAMENTO AREA FLOOD CONTROL AGENCY JOINT POWERS

AUTHORITY
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ X ] Staff
[X] Other
Paul Dirksen Jr., Flood Protection Manager
Capital Projects Department
ATTACHMENT [ X ] Yes [ ] No [ [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
The purpose of this report is to consider resolution 25-64, consenting to the withdrawal of Reclamation District 537 (RD 537) from the West Sacramento Area Flood Control Agency (WSAFCA/Agency) joint powers agreement.

RECOMMENDED ACTION
Staff respectfully recommends that the City Council approve Resolution 25-64, authorizing the withdrawal of Reclamation District 537 (RD 537) from the WSAFCA Joint Powers Agreement.

BACKGROUNDThe City of West Sacramento and Reclamation Districts 900 and 537, established the West Sacramento Area Flood Control Agency in 1994 by entering into a Joint Powers Agreement (JPA), in response to a reconnaissance report that was completed by the USACE following the 1986 storm event that resulted in flooding in various locations throughout the Sacramento Valley. The purpose of the JPA was to coordinate planning and debt financing for developing, designing, acquiring, and constructing flood control facilities, works, and project improvements. Each member of the JPA also contributed funds for conducting studies and staffing WSAFCA to evaluate the levees that protect the city and identify mitigation efforts to reduce the risk of flooding. The financial contributions to the Agency were returned to the member agencies in 2018.

The JPA articulates RD 900, RD 537, and the City as the members to the Agency, the boundaries, purpose, and powers of the Agency and framework for conducting Agency business. The Agreement recognizes the upfront contributions made by each of the entities to the Agency to fund planning and construction activities and repayment of those funds. The Agreement discusses the need to seek funding through grants, property tax assessments and the authorization to use debt financing and articulates the governing body as the one member of the City Council and one trustee from RD 537 and one trustee from RD 900, each serving on behalf of their respective political bodies.

In 2018, following a Yolo Local Agency Formation Commission (YLAFCO) Maintenance Service Review, the City submitted an application to the YLAFCO to bring the RD 900 and a portion of RD 537 under the City as subsidiaries, similar to the Yolo-West Sacramento Port. In the following year, the proposal to reorganize RD 900 as a subsidiary district to the City of West Sacramento and detaching the RD 537 area within the City and annexing the same into the RD 900 territory was approved by the YLAFCO.

On February 15, 2025, staff received an email from Mayor Guererro, regarding a meeting she had with Director Tom Ramos to discuss RD 537’s desire to withdraw from WSAFCA and the JPA. Staff reached out to WSAFCA Chair Ramos, after discussing the withdrawal request with the WSAFCA attorney, and requested that RD 537 submit a letter to document the withdrawal request. Staff received a letter (Attachment 1) from the RD 537 President on April 1, 2025. Staff met with the WSAFCA attorney and researched the contributions that each JPA partner entity had provided and determined that each of the member agencies (RD 537, RD 900, and the City) were repaid for those initial contributions through payment or funds were dedicated to flood risk reduction project work (Attachment 2). Staff also reached out to the City Attorney about RD 537’s desire to withdrawal from the JPA and arranged a meeting with the City and WASFCA attorneys. One item both attorneys thought needed to be addressed was an amendment to the JPA in 2011, which acknowledged that the JPA member agencies and provided a withdrawal from the JPA by a member agency by the Central Valley Flood Protection Board (CVFPB) to provide written assurances for existing project commitments as requested. Staff provided a response to RD 537 (Attachment 4) and requested that they prepare and execute a RD 537 Board Resolution requesting the withdrawal from the WSAFCA JPA and a letter to the CVFPB, indicating their desire to withdraw from the JPA. 115
Resolution 25-64
June 18, 2025

Page 2 ends

ANALYSIS
The Agency achieved many of the goals and objectives outlined in the JPA. A Preliminary Inspection Report and Alternative Analysis were completed in 2007 and 2008; the West Sacramento residents approved a property tax assessment and sales tax measure (Measure V) for flood control, and the City Council approved a flood in-lieu fee on new development. Together, these revenue sources provide for the City’s share for flood protection and have been used to investigate, design, and construct levees that protect the city in cooperation with the State Department of Water Resources and, more recently, with the US Army Corps of Engineers. Four Early Implementation Projects (River’s CHP, I Street, and Southport) were completed between 2011 and 2017 and WSAFCA led design on two Yolo Bypass levee reaches, and the USACE completed YBEL project’s construction.

The original JPA includes provisions for the member agencies to withdrawal from the WSAFCA JPA and requires the unanimous consent of the Parties. In accordance with the language in the JPA, “Any withdrawal with unanimous consent shall be effective on the last day of a specified fiscal year in which the withdrawal is consented to.” RD 537 has requested that this matter be settled this 2024/25 fiscal year. The Agreement further articulates that if a withdrawing member has rights in any facilities or obligations to the Agency, that the member agency cannot sell, lease, or transfer said rights or be relieved of its obligations to pay its share of the operation and maintenance costs related to use of the facilities without a written agreement from the other agencies. RD 537 sent a letter to the CVFPB telling them of their intention to withdrawal from the JPA (Attachment 5). Staff received a response letter from the CVFPB (Attachment 7) that the Board still holds the City and RD 900 responsible for the obligations of the WSAFCA JPA. Those obligations include: operate and maintain flood control works within the Agency’s boundaries; indemnify the State of California for liabilities arising out of such operation and maintenance or failure to conduct same; and /or indemnify the State of California for design or construction of flood control improvements designed or constructed by the Agency. These responsibilities and obligations are also articulated in the Local Project Partnership Agreement with the CVFPB. WSAFCA agrees to these commitments as a funding condition for the West Sacramento Levee Improvement Program.

The three-member board will be reduced to two members with the withdrawal of the RD 537 and will lose a valuable and knowledgeable Director. The WSAFCA attorney opines that the JPA could be composed of a twomember Board, however, a two-member board is potentially problematic for a number of reasons. Two persons will be needed for a quorum on a two-member board, and an absence by one of the Directors or disagreement on an agenda item that isn’t approved by both directors will not allow the Agency to conduct its business. Staff will return to the board at a subsequent meeting to present potential options for a different composition of the WSAFCA Board.

Environmental Considerations
N/A
Commission Recommendation
The withdrawal of RD 537 from the WSAFCA JPA will also be presented to the WSAFCA Board and Reclamation District 900 Board for their consent.

Strategic Plan Integration
N/A
Alternatives
The City Council may choose among the following alternatives:
1) Approve the recommended actions as stated above.
2) Decline to approve the recommended actions
Staff recommends Alternative 1 to prevent potential delays that could impact the WSAFCA Board’s ability to conduct business.

Coordination and Review
This report was prepared by the Capital Projects Department in coordination with the City and WSAFCA Attorney.

Budget/Cost Impact
N/A

ATTACHMENTS
Attachment 1 - Resolution 25-64
116
Resolution 25-64
June 18, 2025

Page 3 ends

Attachment 2 - RD 537 Withdrawal Letter
Attachment 3 - JPA Authorization for Repayment
Attachment 4 - 2011 JPA Amendment
Attachment 5 - WSAFCA Response Letter
Attachment 6 - RD 537 Letter to CVFPB
Attachment 7 – CVFPB RD 537 Withdrawal Acknowledgment
117
Attachment 1
1 RESOLUTION 25-64

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO CONSENTING TO THE WITHDRAWAL OF RECLAMATION DISTRICT NO. 537 FROM THE

WEST SACRAMENTO AREA FLOOD CONTROL AGENCY JOINT POWERS AGREEMENT WHEREAS, the City of West Sacramento ("City"), Reclamation District No. 900 ("RD 900"), and Reclamation District No. 537 ("RD 537") are parties to the 1993 West Sacramento Area Flood Control Agency Joint Exercise of Powers Agreement ("JPA"), which formally created the West Sacramento Area Flood Control Agency ("WSAFCA"); and WHEREAS, pursuant to a July 2020 reorganization by Yolo County LAFCo, RD 537's service area in the City was transferred to RD 900; and WHEREAS, RD 537 remained involved in WSAFCA since 2020 assisting in completing and closing out the Southport Levee Improvement Project, and the formalizing of a Project Partnership Agreement with the US Army Corps of Engineers and the State of California, which will enable the completion of the federal project and 200+ year flood protection for the City; and WHEREAS, RD 537 no longer maintains flood control responsibilities within the City; and WHEREAS, on April 20, 2025, the RD 537 Board of Directors adopted Resolution No. 2025-04-02 entitled "Resolution Withdrawing From The West Sacramento Area Flood Control Agency JPA" declaring the intent of RD 537 to withdraw from the JPA effective June 30, 2025; and
WHEREAS, Section 34(a) of the JPA provides that: "No Party may withdraw from the Agency without the unanimous consent of the Parties. Any withdrawal with unanimous consent shall be effective on the last day of a specified fiscal year in which the withdrawal is consented to."
WHEREAS, the City, RD 900 and RD 537, adopted an amendment to the JPA, effective October 13, 2011, providing that no Party to this Agreement may withdraw from the JPA Agreement so long as the WSAFCA has outstanding Project Commitments, unless such withdrawing party first provides such reasonable written assurances regarding the Project Commitments as the Central Valley Flood Protection Board ("CVFPB") may request.

WHEREAS, RD 537 has provided the assurances required by the CVFPB.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of West Sacramento as follows:

1. Having complied with the conditions for withdrawal from the JPA, the City hereby consents to RD 537's withdrawal from JPA and WSAFCA effective June 30, 2025, as provided in section 34(a) of the JPA as amended.

2. The City hereby authorizes and directs the City Manager and the City's Flood Protection Manager, or their designees, to take any and all other actions that may be necessary, consistent with the terms of this Resolution and the JPA, as amended, to complete the withdrawal described herein.

PASSED AND ADOPTED by the City Council of the City of West Sacramento this 18th day of June, 2025, by the following vote:

AYES:

NOES:

ABSENT:
118
Attachment 1
2 _________________________________
Martha Guerrero, City Mayor
ATTEST:
__________________________
Jennifer Cusmir, City Clerk
119
120
121
122
123
EXHIBIT "B"

AMENDMENT TO WEST SACRAMENTO AREA FLOOD CONTROL AGENCY JOINT EXERCISE OF POWERS AGREEMENT ("JPA")
This Amendment to JPA is entered into effective as of October 13, 2011 by and between the undersigned Members of the West Sacramento Area Flood Control Agency ("WSAFCA") in consideration of the covenants hereinafter set forth.

RECITALS:

A. The City of West Sacramento, Reclamation District No. 900 ("RD900") and Reclamation District No. 537 ("RD537") are all Members of WSAFCA.

B. Since its formation on July 20, 1994, WSAFCA has been working diligently to enhance the level of flood protection provided within its boundaries, which boundaries are coextension with the boundaries of the City of West Sacramento.

C. WSAFCA, as Funding Recipient, has entered into Funding Agreements with the State of California Department of Water Resources for flood improvement projects funded under the State-Federal Flood Control System Modification Program (Early Implementation Program) (each a "Construction Funding Agreement").

D. A Construction Funding Agreement requires that WSAFCA be ultimately responsible for and indemnify the State for operation, repair, replacement and rehabilitation of any portion of a flood control project not currently required to be operated, repaired, replaced, or rehabilitated by the State ("OMRR&R") after WSAFCA has entered into binding Agreements to Seek Responsibility for OMRR&R with each of RD900 and RD537, (the entities currently responsible for OMRR&R of such federally authorized flood control project works within their respective boundaries) requiring RD900 and RD537 to enter into OMRR&R Agreements with the Central Valley Flood Protection Board ('CVFPB"), if RD900 and/or RD537 fail to enter into or fail to perform under such OMRR&R Agreements.

E. The CVFPB has adopted a policy resolution, Resolution 09-17, under which the CVFPB will accept indemnification for OMRR&R from a Joint Powers Agency which is a local sponsor for a flood control improvement project requiring a permit from the CVFPB, without requiring indemnification for OMRR&R from each and all of its member agencies, if, (I) the JPA provides that it will not be dissolved so long as the Joint Powers Agency has made outstanding commitments to the CVFPB for OMRR&R and OMRR&R indemnification, or (ii) the member agencies of the Joint Powers Agency will provide the foregoing maintenance assurances and indemnification prior to the Joint Powers Agency dissolving, or (iii) the Joint Powers Agency provides to CVFPB such other agreements or assurances as may be acceptable to the CVFPB.

F. The purpose of this Amendment to JPA is to comply with the CVFPB policy resolution referenced in recital E, above, so as not to require indemnification for OMRR&R by all of the Members of WSAFCA.

AGREEMENT:

This JPA is hereby amended so as to add Section 39 thereto, to read as follows:
(00932929)
124

AMENDMENT TO WEST SACRAMENTO AREA FLOOD CONTROL AGENCY JOINT EXERCISE OF POWERS AGREEMENT ('JPA")
October 13, 2011
"39. Project Commitment:: Made to State of California. (a) For purposes of this Section, "Project CommLI1€nts" shall mean agreements between the Agency and the Central Valley F lood Protection Board or any successor entity (collectively "CVFPB") tc: (i) operate and maintain flood control works within the boundaries of the A (ii) indemnify the State of California for liabilities arising out of such or,-.ration and maintenance or the failure to conduct same; and/or (iii) indemnify the State of California for design or construction of flood control improvements designed or constructed by the Agency. (b) Notwithstanding the provisions of Section 32, this Agreement may not be rescinded or terminated or the Agency formed hereby dissolved so long as the Agency has outstanding Project Commitments unless the relevant Member or Members of the Agency first provide such reasonable written assurances regarding the Project Commitments as the CVFPB may request.
(c) Notwithstanding the provisions of Section 34, no Party to this Agreement may withdraw from the Agreement so long as the Agency has outstanding Project Commitments, unless such withdrawing party first provides such reasonable written assurances regarding the Project Commitments as the CVFPB may request.
(signatures next page)
{00932929} 2
125

AMENDMENT TO WEST SACRAMENTO AREA FLOOD CONTROL AGENCY JOINT EXERCISE OF POWERS AGREEMENT ("JPA')
October 13, 2011

2. This Amendment to JPA may be executed in multiple counterparts, ,1l of which, taken together, shall constitute one single Amendment to JPA.

CITY OF WEST SACRAMENTO
Chairpersorq 1/
ATTEST
j4
city Clerk
APPROVED AS TO FORM:
c:;:2 '4
Jeffrey A. Mit chell, City Attorney
LAMA
Cha
ATTEST
2L/ ~' - ~'4
Secretary
AP STO FORM:
r ~~o /
David ad m, Attorney
RECLAMATION DISTRICT NO. 900
K P, 0 W,
ATT
Secretary
APPROVED AS TO FORM:

James M. Day Jr..1t(orney
/7
{00932929} 3
126
State of California FILE
Secretary of State
IF 0AV* 1

AMENDMENT OF A JOINT POWERS AGREEMENT
(Government Code section 6503.5)
Instructions:

Complete and mail to: Secretary of State, P.O. Box 942877, Sacramento, CA 94277-0001.

2. Include filing fee of $1.00. I (Office Use Only)

3. Do not include attachments.

4. A copy of the full text of the joint powers agreement and amendments, if any, must be submitted to the State Controller's office. For address information, contact the State Controller's office at www.sco.ca.gov .

Date of filing initial notice with the Secretary of State: August 16, 1994 File number of initial notice: No. 1400
Name of the agency or entity created under the agreement and responsible for the administration of the agreement:

West Sacramento Area Flood Control Agency
Agency's or Entity's Mailing Address: P.O. Box 673, West Sacramento, CA 95691 Title of the agreement: AmendmenttoWestSacramentoAreaFloodControlAgencyJoint Exercise of Powers Agreement
Complete one or more boxes below. The agreement has been amended to:

Change the parties to the agreement as follows:

Change the name of the administering agency or entity as follows:

Change the purpose of the agreement or the powers to be exercised as follows:

Change the short title of the agreement as follows:

X ] Make other changes to the agreement as follows: ChangethemannerinwhichtheAgreement may berescindedandtheAgencyterminatedandinwhichamembermaywithdrawfrom Ag_____________
RETURN ACKNOWLEDGMENT TO: (Type or Print)
the ency. October 13, 2011
Date
NAME [James H. Day,-.Jr. 1
Day Carter & Murphy LLP __________________________________ ,é2Z9_ —,(.3 LI 360 American River Drive, Ste 205 ADDRESS Sacramento, CA 95864 Signature CITY/STATE/ZIP L J KennethA.Ruzich,GeneralManager
Typed Name and Title
SEC/STATE NP/SF 404B (REV. 10/2010)
127
Bill Mattos, President RD 537
PO Box 980605
West Sacramento, CA 95798
Re: RD 537 withdrawal from WSAFCA Joint Powers Agency;
Bill,
Thanks for your letter dated April 30, 2025 and the RD 537 Board Resolution, regarding the withdrawal of RD 537 from the WSAFCA JPA. WSAFCA acknowledges that the RD 537 service area no longer includes any portions of the City of West Sacramento and its desire to exit the WSAFCA JPA. On behalf of the Agency, we recognize and appreciate RD 537’s contributions to the JPA, which facilitated the Project Partnership Agreement with the US Army Corps of Engineers.

I’m writing you about a JPA amendment (Amendment 11-10-01) that was executed by RD 900, RD 537, and the City, to comply with a Central Valley Flood Protection Board Resolution 09-17, requiring WSAFCA to make certain project commitments for operation, maintenance, repair, rehabilitation and replacement (OMRR&R) and provide OMRR&R indemnification to the State of California for any portion of the flood control project not performed by the State of California.

The CVFPB resolution was written to commit the WSAFCA JPA and not the member agencies to the OMRRR responsibilities and State of California indemnification. However, Amendment 11-10-01 also addresses WSAFCA members’ duties in the event of a member withdrawal:
"39. Project Commitments Made to State of California. (a) For purposes of this Section, "Project Commitments" shall mean agreements between the Agency and the Central Valley Flood Protection Board or any successor entity (collectively "CVFPB") to: (i) operate and maintain flood control works within the boundaries of the Agency, (ii) indemnify the State of California for liabilities arising out of such operation and maintenance or the failure to conduct same; and/or (iii) indemnify the State of California for design or construction of flood control improvements designed or constructed by the Agency. ***
(c) Notwithstanding the provisions of Section 34, no Party to this Agreement may withdraw from the Agreement so long as the Agency has outstanding Project Commitments, unless such withdrawing party first provides such reasonable written assurances regarding the Project Commitments as the CVFPB may request.

I do not believe that the City or RD 900 oppose the RD 537 withdrawal from the Agency, but we believe that you need to contact the Central Valley Flood Protection Board and inform them of your desire to withdraw from the JPA and what they may request/require for the withdrawal from WSAFCA. We are open to working with you and meeting with CVFPB about the RD 537 withdrawal.

Docusign Envelope ID: B92A7EF9-EBD1-4A6D-B204-EB5AADE4A33F 128
Please let me know how you would like to proceed. I can be contacted by email at [email protected] or by phone at 916-617-4560.

Sincerely,
Paul Dirksen, Jr. General Manager
Enclosures: Resolution
Tom Ramos
Ralph Nevis
William Chisum
Blake Johnson
Docusign Envelope ID: B92A7EF9-EBD1-4A6D-B204-EB5AADE4A33F 5/6/2025 | 7:00:22 AM PDT
129
May 12, 2025
130
131
132
133
134
STATE OF CALIFORNIA – CALIFORNIA NATURAL RESOURCES AGENCY GAVIN NEWSOM, GOVERNOR

CENTRAL VALLEY FLOOD PROTECTION BOARD
3310 El Camino Ave., Ste. 170
SACRAMENTO, CA 95821
(916) 574-0609
June 5, 2025
Paul Dirksen
City of West Sacramento
1110 West Capitol Avenue
West Sacramento, California, 95691
Blake Johnson
Reclamation District 900
P.O. Box 673
West Sacramento, California, 95691
William Mattos
Reclamation District 537
P.O. Box 980605
West Sacramento, California, 95798
Subject: Reclamation District 537’s Request to withdrawal from the West Sacramento Area Flood Control Agency Joint Powers Authority Dear Members of the Joint Powers Authority:

The Central Valley Flood Protection Board (CVFPB) received a letter, dated May 12, 2025, from Reclamation District 537 (RD537), informing the CVFPB of its intent to withdraw from the West Sacramento Area Flood Control Agency Joint Powers Authority (JPA) between the City of West Sacramento, Reclamation District 900, and RD537, effective June 30, 2025.

A copy of RD537’s letter and accompanying documents the CVFPB received are attached for your convenience and reference. Notwithstanding RD537’s intended withdrawal from the JPA, the obligations outlined in the JPA remain in effect and must be fulfilled by the remaining members of the JPA.

Sincerely,
Chris Lief
Executive Officer
Attachments
cc: (via electronic copy)
Ralph Nevis
William Chisum
Docusign Envelope ID: FEAF4BA3-0FCC-4484-852D-87BF0AA8936A 135
May 12, 2025
136
137
138

AMENDMENT TO WEST SACRAMENTO AREA FLOOD CONTROL AGENCY JOINT EXERCISE OF POWERS AGREEMENT ("JPA")
October 13, 2011
"39. Project Commitments Made to State of California. (a) For purposes of this Section, "Project Commitments" shall mean agreements between the Agency and the CentraJ Valley Frood Protection Board or any successor entity (collectively "CVFPB") to: (i) operate and maintain flood control works within the boundaries of the Agency, (ii) indemnify the State of Caljfomia for liabilities arising out of such operation and maintenance or the failure to conduct same; and/or (iii) indemnify the State of California for design or construction of flood control improvements designed or constructed by the Agency. (b) Notwithstanding the provisions of Section 32, this Agreement may not be rescinded or terminated or the Agency formed hereby dissolved so long as the Agency has outstanding Project Commitments unless the relevant Member or Members of the Agency first provide such reasonable written assurances regarding the Project Commitments as the CVFPB may request.
(c) Notwithstanding the provisions of Section 34, no Party to this Agreement may withdraw from the Agreement so long as the Agency has outstanding Project Commitments, unless such withdrawing party first provides such reasonable written assurances regarding the Project Commitments as the CVFPB may request.
(signatures next page)
(D0932929} 1392
140

CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 11
SUBJECT:

CONSIDERATION OF APPROVAL OF RESOLUTION 25-70 SUPPORTING AN

ADDENDUM TO THE SOUTHPORT SACRAMENTO RIVER EARLY IMPLEMENTATION

PROJECT FINAL ENVIRONMENTAL IMPACT REPORT FOR THE SOUTHPORT LEVEE RECREATION TRAIL PROJECT (CIP 62147)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ X ] Staff
[ ] Other
Jai Chahal, Const. & Facilities Dev. Manager
Capital Projects Department
ATTACHMENT [ X ] Yes [ ] No [ ] Information [ ] Direction [ X ] Action

OBJECTIVE
To consider adoption of Resolution 25-70 supporting an Addendum to the Southport Sacramento River Early Implementation Project (SSREIP) Final Environmental Impact Report (EIR) (SCH No. 2011082069) to include the Southport Levee Recreation Trail Project (CIP 62147).

RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Adopt Resolution 25-70, approving an Addendum to the Southport Sacramento River Early Implementation Project Final Environmental Impact Report (SCH No. 2011082069) for the Southport Levee Recreation Trail Project (CIP 62147);
2) Approve the Southport Levee Recreation Trail Project (CIP 62147); and 3) Authorize the City Manager or designee to file a Notice of Determination in accordance with CEQA.

BACKGROUND
The Southport Sacramento River Early Implementation Project (SSREIP), implemented by the West Sacramento Area Flood Control Agency (WSAFCA) in partnership with the California Department of Water Resources (DWR) and U.S. Army Corps of Engineers (USACE), involved flood risk-reduction improvements to approximately 5.6 miles of the Sacramento River South Levee. The Final Environmental Impact Report (EIR) for the SSREIP was certified in 2014 (SCH No. 2011082069), and a Subsequent EIR was prepared in 2016 to address the use of an additional borrow site during construction. Levee construction was completed in 2018.

To advance recreational use of the newly constructed levee, staff began preparation of a grant application in December 2020 for the Sacramento-San-San Joaquin Delta Conservancy’s Community and Economic Enhancement (CEE) Grant Program. The CEE program supports projects that sustain Delta heritage and enhance community access and engagement.

To prepare a formal grant application, the City issued a Request for Proposals for the Southport Levee Planning and Design Project. Mark Thomas Inc. was selected as the lead consultant based on its experience with levee, flood, and trail projects. The City worked with Mark Thomas to refine the scope and cost for design and environmental documentation.

On December 8, 2021, the City Council:
 Approved a grant agreement with the Sacramento–San Joaquin Delta Conservancy for $337,863 to fund planning and design, and
 Awarded a professional services contract to Mark Thomas Inc. for environmental documentation, design, and permitting of the 5.6-mile Class I multi-use trail.

On February 13, 2023, the City Council approved Contract Amendment No. 1 in the amount of $4,308 to provide legal descriptions for securing a Recreation Easement.

On February 21, 2024, the City Council approved Contract Amendment No. 2 for additional environmental, design, and permitting services.

The current action completes the CEQA documentation phase through adoption of an Addendum to the SSREIP EIR to evaluate potential environmental impacts associated with the Southport Levee Recreation Trail Project (CIP 62147).
141
Addendum to the Southport Sacramento River Early Implementation EIR June 18, 2025

Page 2 ends

ANALYSIS
The City, as lead agency under CEQA, prepared an Addendum to the certified SSREIP Final EIR pursuant to CEQA Guidelines Section 15164. (Attachment 1) The Addendum evaluates the Southport Levee Recreation Trail Project, which includes paving the levee crown for a Class I multi-use trail and constructing support features such as trailheads, parking, signage, rest stops, and monuments.

The Addendum concludes that the project does not involve new or substantially more severe significant impacts not previously analyzed in the SSREIP EIR and Subsequent EIR. Therefore, preparation of a Subsequent or Supplemental EIR is not required. The proposed trail project is consistent with the original levee footprint and project purpose and does not alter mitigation requirements or previously adopted CEQA findings.

Environmental Considerations
The Addendum prepared under CEQA Guidelines Section 15164 demonstrates that the project would not result in new or more severe significant impacts than those previously analyzed. All applicable mitigation measures from the SSREIP EIR remain in effect. Adoption of the Addendum satisfies CEQA requirements for environmental consideration of the Southport Levee Recreation Trail Project.

Commission Recommendation
N/A
Strategic Plan Integration
N/A
Alternatives
The City Council may consider the following alternatives:
1) Approve Resolution 25-70 adopting the Addendum and the project as recommended. 2) Direct staff to modify the Addendum and return at a later date. 3) Decline to approve the Addendum.

Staff recommends Alternative 1, as the project is subject to strict grant deadlines, and any delay in approving the EIR Addendum could jeopardize the City’s ability to meet required timelines Coordination and Review
This report was prepared by the Capital Projects Department in coordination with and review by the Community Development Department.

Budget/Cost Impact
This project is included in the City’s current Capital Improvement Program (CIP) as CIP 62147: Southport Levee Recreation Trail Project.

ATTACHMENTS
1) Vicinity Map
2) Resolution 25-70
3) Addendum to the SSREIP Final EIR (SCH No. 2011082069) 142
143
Attachment 2
RESOLUTION 25-70

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF WEST SACRAMENTO

ADOPTING AN ADDENDUM TO THE SOUTHPORT SACRAMENTO RIVER EARLY IMPLEMENTATION PROJECT FINAL ENVIRONMENTAL IMPACT REPORT (SCH NO. 2011082069) FOR THE SOUTHPORT LEVEE RECREATION TRAIL PROJECT (CIP 62147) WHEREAS, the West Sacramento Area Flood Control Agency (WSAFCA), in partnership with the California Department of Water Resources (DWR) and the U.S. Army Corps of Engineers (USACE), completed the Southport Sacramento River Early Implementation Project (SSREIP) in 2018 to reduce flood risk along the Sacramento River South Levee in the City of West Sacramento; and
WHEREAS, the Final Environmental Impact Report (EIR) for the SSREIP was certified in 2014 (SCH No. 2011082069), and a Subsequent EIR was prepared in 2016 for additional borrow site use; and
WHEREAS, the City of West Sacramento is proposing the Southport Levee Recreation Trail Project (CIP 62147), which includes a 5.6-mile paved multi-use trail and associated improvements along the crown of the completed levee; and WHEREAS, pursuant to the California Environmental Quality Act (CEQA) and CEQA Guidelines Section 15164, the City, acting as lead agency, has prepared an Addendum to the certified SSREIP Final EIR to evaluate the environmental effects of the proposed trail project; and WHEREAS, the Addendum concludes that the proposed project would not result in new or substantially more severe significant environmental effects than those analyzed in the previously certified EIRs and that no new mitigation measures are required; and WHEREAS, the City Council has reviewed and considered the Addendum, together with the certified SSREIP Final EIR and 2016 Subsequent EIR, and finds the Addendum reflects the City’s independent judgment and analysis.

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of West Sacramento:

1. The City Council finds that the Addendum to the certified SSREIP Final EIR (SCH No. 2011082069) has been completed in accordance with CEQA and CEQA Guidelines Section 15164.

2. The City Council hereby adopts the Addendum to the SSREIP Final EIR for the Southport Levee Recreation Trail Project (CIP 62147).

3. The City Council reaffirms the findings, including applicable mitigation measures, set forth in the certified 2014 Final EIR and 2016 Subsequent EIR for the SSREIP.

4. The City Council approves the Southport Levee Recreation Trail Project as described in the Addendum.

5. The City Council authorizes the City Manager or designee to file a Notice of Determination pursuant to CEQA.

PASSED AND ADOPTED by the West Sacramento City Council this 18th day of June 2025, by the following vote:
144
Resolution 25-70

Page 2 ends

AYES:

NOES:

ABSENT:

Martha Guerrero, Mayor
ATTEST:

Jennifer Cusmir, City Clerk
145

CARLSBAD
CLOVIS
IRVINE

LOS ANGELES

PALM SPRINGS

POINT RICHMOND

RIVERSIDE

ROSEVILLE

SAN LUIS OBISPO
1504 Eureka Rd, Suite 310, Roseville, California 95661 916.772.7450 www.lsa.net

MEMORANDUM
DATE: December 11, 2024
TO: Erik Smith, Division Manager
Mark Thomas & Company Inc.
2833 Junction Avenue, Suite 110
San Jose, California 95134
FROM: Edward Heming, AICP, Principal and Lynnea Palecki, Assistant Planner SUBJECT: Addendum to the Southport Sacramento River Early Implementation Project (SSREIP) Final Environmental Impact Report (EIR) (SCH No. 2011082069) This memorandum, prepared pursuant to the California Environmental Quality Act (CEQA) describes the revisions to the to the Southport Sacramento River Early Implementation Project (SSREIP) Final Environmental Impact Report EIR (approved project), certified on August 14, 2014, by the West Sacramento Area Flood Control Agency Board.

INTRODUCTION
The following describes the proposed Southport Levee Recreation Trail (SLRT) (proposed project) that is the subject of this Addendum prepared pursuant to CEQA. The proposed project would result in the construction of a new trail and associated improvements (e.g., site access, parking, rest stop bulb-outs, signage and monuments) to the existing Southport Levee as described in more detail below. The City of West Sacramento (City) is the lead agency for review of the proposed project under CEQA.

The Final Environmental Impact Report (FEIR) for the Southport Sacramento River Early Implementation Project (SSREIP) (approved project) evaluated the potential environmental impacts anticipated to result from construction and operation of the proposed project, which is part of the larger multiphase project that completed construction in 2018. The SSREIP included the construction of flood risk-reduction measures along the Sacramento River South Levee. Levee improvements included a combination of fix in place and a new setback levee embankment construction with cutoff walls, seepage berms, utility relocation, demolition, rock slope protection, and the use of borrow sites. Project transportation improvements included realigned roadways, new access ramps and roads, turnouts, cul-de-sacs, and maintenance corridors. The SSREIP also constructed flood riskreduction measures to addressed deficiencies of through-seepage, under-seepage, slope stability and geometry, erosion, encroachments, and noncompliant vegetation. The SSREIP’s goal was to achieve a 200-year level minimum of levee performance for the City of West Sacramento bringing the levee up to Federal and State standards.
146
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 2 The proposed project would consist of a new 5.9-mile paved multi-use trail and associated improvements (e.g., site access, parking, rest stop bulb-outs, signage and monuments). The majority of the proposed trail would extend along the crown of the recently constructed levee (including the Southport Setback Levee). Other segments of the proposed trail would extend along the top of a historical levee, historic-period railroad grade, or on elevated roadway. The proposed project would be a new addition to the existing Southport Setback Levee and was not previously entitled under the approved project.

This Addendum is prepared pursuant to State CEQA Guidelines Section 15164(b) which states: “An addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in Section 15162 calling for preparation of a subsequent EIR or negative declaration have occurred” Section 15162 specifies that “no subsequent EIR [or MND] shall be prepared for that project unless the lead agency determines … one or more of the following:

1. Substantial changes are proposed in the project which will require major revisions of the previous EIR [or MND] due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects;

2. Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR [or MND] due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or

3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR [or MND] was certified as complete was adopted, shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR [or MND];
b. Significant effects previously examined will be substantially more severe than shown in the previous EIR [or MND];
c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR [or MND] would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.”
Pursuant to State CEQA Guidelines Section 15164(e), this Addendum summarizes the changes to the proposed project evaluated in the Final EIR for the SSREIP and the reasons for the City’s conclusion that changes to the proposed project and associated environmental effects do not meet the 147
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 3 conditions described in State CEQA Guidelines Section 15162 requiring preparation of a subsequent MND.

PROJECT BACKGROUND
The SSREIP is part of a multiphase project that was completed in 2018. The levee was constructed by the West Sacramento Flood Control Agency (WSAFCA) and completed in partnership with the California Department of Water Resources (DWR) and the U.S. Army Corps of Engineers (USACE).

The approved project was certified in 2014 (State Clearinghouse [SCH] No. 2011082069). The 2014 FEIR proposed the construction of flood risk-reduction measures along approximately 5.6 miles of the Sacramento River South Levee, extending from river mile (RM) 57.2 to RM 51.6 within the Sacramento River South Levee, to bring the levee up to current federal and State standards. The proposed levee improvements included the construction of a new setback levee embankment with slurry cutoff walls, seepage berms, and rock slope protection. After certification of the SSREIP EIR, a Subsequent EIR was prepared in April 2016 for the use of the Borrow One Site, which provided an additional location for sourcing borrow material during project construction. Construction of the SSREIP was completed in 2018.

PROPOSED PROJECT CHANGES
The “proposed project” for the purposes of this Addendum includes the construction of a new paved multi-use trail and associated improvements (e.g., site access, parking, rest stop bulb-outs, signage and monuments) to the existing Southport Levee as described in more detail below. The City of West Sacramento is the lead agency for review of the proposed project under CEQA.

Project Site
The following section describes the project location, existing conditions, surrounding land uses, and regulatory setting.

Project Location
The project site consists of 5.9 linear miles atop the existing Southport Setback Levee (levee), which is under the jurisdiction of the WSAFCA. The project site is located in the southern portion of the City of West Sacramento along the Sacramento River. The project site is bounded to the south-by South River Road at Riverview (an unincorporated community in Yolo County) and to the north by the intersection of South River Road and Locks Drive. Figure 1 depicts the regional vicinity.

Regional vehicular access to the project site is provided by the Capitol City Freeway (Interstate 80 Business), located approximately 1.25 miles north of the project site. The closest on- and off-ramps to the project site are located along Jefferson Boulevard, approximately 0.3 miles to the west.

Bicycle paths provide multi-modal service to the project site. Figure 2 depicts the project site and surrounding vicinity.
148
149
150
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 6 Existing Conditions
The project site is located on the top of the west bank levee of the Sacramento River and is relatively flat with site elevations ranging from approximately 17 to 23 feet above the landside toe, with crown elevations between 34 and 40 feet. South River Road lies along most of the levee crest and crest widths are generally slightly greater than the minimum of 20 feet. The topography of the portions of the project site that are adjacent to the levee is relatively level and range from less than 5 feet to approximately 20 feet above mean sea level.

There is an approximately 14-inch layer of aggregate base on top of the levee on which the new trail would be constructed. Levee soils are typically silty sand and poorly graded clean sand. Beneath the levee materials, the typical soil profile consists of a layer of fine-grained silt or clay (interpreted to be overbank deposits) underlain by up to 100 feet of sand and gravel, with interbedded silty sand and clayey sand layers.

Surrounding Land Uses
As shown in Figure 2, the project site is generally surrounded by riparian and river uses. To the east is the Sacramento River, riparian wetlands, and woodlands. Additionally, existing development is present to the east of the middle section of the trail, consisting of the Sacramento Yacht Club and Sherwood Harbor Marina and RV Park. This middle portion of the proposed trail and surrounding areas are located within the Liberty Specific Plan (LSP) area, which proposes low-, medium-, and high-density residences, including single-family homes as well as a recreation area and green belt.

The LSP was certified on October 2, 2017. To the west are grasslands and prairies, woodlands, riparian wetlands, and residential developments (Stonegate Residential development to the northwest end of the site, and individual homes along Village Parkway and the Clarksburg Branch line and further south down to the unincorporated community of Riverview). To the south of the project site is South River Road and agricultural row crop uses.

Circulation and Access
Existing access to the site includes the Locks Drive River access, the Linden Road River access, the Davis Road River access, the Clarksburg Branch line access, and South River Road in the unincorporated community of Riverview. Additionally, there are vehicular crossings at Chicory Lane at the north and south to provide access to the Sacramento Yacht Club and Sherwood Harbor Marina and RV Park. All access points are paved. Interior access would be provided for occasional agency service vehicles via the levee and trail, within the project area.

Regulatory Setting
The City of West Sacramento General Plan Land Use Map1 designates the project site as Open Space (OS). This land use is intended to provide open space, and the City has set aside open space areas along the Sacramento River and Port of Sacramento Deep Water Ship Channel to preserve open 1 City of West Sacramento. 2016. General Plan Land Use Diagram. November. Website: https://www.cityof westsacramento.org/home/showpublisheddocument/2594/636400844089430000(accessed July 19, 2024).
151
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 7 areas near these water ways. The City of West Sacramento Zoning Map2 identifies the project site as Public Open Space (POS). The City of West Sacramento Parks, Recreation and Open Space Master Plan3 has identified trails/recreation corridors, including the project site, as designated open space along the Sacramento River to connect people and places while serving as active transportation facilities. According to the Parks, Recreation, and Open Space Master Plan, multi-use trails fulfill three guiding principles simultaneously: protecting natural areas along rivers and open space areas, providing accessible enjoyment for people, and offering a safe, healthy alternative form of active transportation.

PROPOSED PROJECT
The proposed project involves the construction of a recreational multi-use trail and associated improvements along an existing levee alignment, from the northern terminus at South River Road and Stonegate Drive south to the southern terminus at South River Road in the unincorporated community of Riverview. Individual components of the proposed project are discussed below.

Trail Improvements
As previously discussed, the proposed project would result in the construction of a paved multi-use trail consisting of a 5.9-mile contiguous Class I Bike Path on a portion of the crown of the recently constructed Southport Setback Levee. The multi-use trail would be an average of 12 feet wide along the length of the trail and would include striping and signage. Although a majority of project area is positioned on the crown of the levee existing setback levee and historic levee, a portion of the project area extends down the levee embankment in a few locations, where it remains within the levee footprint (i.e., on fill). Some portions of the project area sit on elevated roadway (approximately at the height of the levee crown) or on historical railroad grade.

Eight concrete bulb-outs would be placed periodically on the trail for rest areas and would include associated seating, signage, and trash receptacles. The entry point at South River Road to the north is already paved, as part of the proposed project, approximately 0.57 mile of South River Road would be restriped, and a new slurry seal would be applied to the trail. Figure 3 shows the proposed access points for the proposed project.

Additionally, the proposed project would include a 0.30-mile trail spur near the south end of the project which would tie into the Clarksburg Branch Line Trail connection. This spur will be a 12-footwide aggregate trail in place of an existing dirt path. 2 City of West Sacramento. 2016. City of West Sacramento Zoning Map. October. Website: https://www. cityofwestsacramento.org/home/showpublisheddocument/2616/636400844121930000: (accessed July 19, 2024). 3
City of West Sacramento. 2019. Parks, Recreation and Open Space Master Plan. Website: https://www. cityofwestsacramento.org/home/showpublisheddocument/10072/637121797939770000 (accessed July 19, 2024).
152
SOURCE: Mark Thomas
FIGURE 3
I:\M\MKT2203\G\Prop_Trail_Access_Points.ai (10/11/2024) Proposed Trail Access Points
Southport Levee Recreation Trail Project

NO SCALE SOUTHPORT LEVEE RECREATION TRAIL
Trail Entrance at
Village Parkway
153
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 9 Access and Circulation
Primary vehicular access to the project site would be provided at the main entry point of the South River Road and Village Parkway and would serve as a gateway to the proposed Southport Levee Recreation Trail. The South River Road and Village Parkway entrance would be improved with gravel parking, an information kiosk, a paved asphalt area with benches, 24 parking stalls and two Americans with Disabilities Act (ADA)-compliant striped parking stalls, and trash receptacles.

Six additional existing access points would be improved as part of the proposed project including, one at the existing Linden Road trailhead, one at the Davis Road Trail connection, one near the Clarksburg Branch Line Trail connection, one on the southern trail connections at South River Road, and one the northern and southern connections at Chicory Loop. These access points would generally be improved with a concrete-paved area, information signage, trash receptacles, and seating. Additionally, the Chicory Loop access point would be improved with high visibility crosswalks and associated traffic signage, for both trail users and roadway users. Additionally, bicycle racks be placed, at the Village Parkway Trail Entrance and at the convergence of the Southport Levee Recreation Trail and the future Clarksburg Branch Line Trail.

Signage and Plaza
The proposed project would include signage along the trail, at key points of interest. Additionally, a connection plaza would be constructed at the Clarksburg Branch Line Trail connection with seating and interpretive signage.

Utilities and Infrastructure
The project would not require any utility relocations.

Construction
The proposed project would construct a recreational 12-foot-wide multi-use trail and associated improvements along an existing 5.9-mile levee alignment.

Generally, only minor grading will be required for site preparation and ground disturbance associated with paving the trail, parking and associated ramps. All fill from paving would occur on the inland side of the levee. A total of 11.25 acres of land would be disturbed during construction activities. Approximately 650 cubic yards of fill soil would be imported for the northern connection point and the connection of Southport Trail and Clarksburg Branch Line Trail. Excavation for the proposed project is anticipated to reach a maximum depth of 14 inches below ground surface for the installation of signage. Additionally, no groundwater dewatering is anticipated during construction of the proposed project.

Construction of the proposed project is anticipated to begin in August 2025 and would occur over an approximately 9–12 month period. Anticipated construction equipment associated with the proposed project includes asphalt pavers, backhoe loaders, compactors, skid steer/multi-terrain loaders, transport trucks, and cement mixer trucks.
154
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 10

PROJECT APPROVALS
While the City is the CEQA Lead Agency for the proposed project, other agencies also have discretionary authority related to the project and approvals or serve as a responsible and/or trustee agency in connection to the proposed project. A list of these agencies and potential permits and approvals that may be required is provided in Table A.

Table A: Potential Permits and Approvals
Lead Agency Permits/Approvals
City of West Sacramento • Adoption of the addendum for the Southport Levee Recreational Trail Project
Other Agencies
West Sacramento Flood Control Agency • Review/Approve trail design California Department of Water Resources (DWR) • Review/Approval trail design U.S. Army Corps of Engineers (USACE) • 408 Permit for levee Yolo County Habitat Conservation Plan (HCP) • HCP application and approval for coverage Source: LSA (2023).

COMPARISON TO THE CONDITIONS LISTED IN STATE CEQA GUIDELINES SECTION 15162 The following Table B is an analysis comparing the certified EIR (certified in 2014) to the proposed project. The purpose of this analysis is to determine whether implementation of the proposed project would result in any new or substantially adverse environmental impacts when compared to the previous project.
155
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 11 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Flood Risk Management and Geomorphic Conditions
Significance Criteria (FR-1):

Change in Flood Risk
Associated with Water
Surface Elevation
Impact FR-1: The approved project
identified a less than significant impact
to floods risks associated with water
surface elevation. Implementation of
the approved project would not result
in significant direct effects related to
local flood risk management. The
construction of an adjacent levee or a
setback levee as part of the approved
project would help reduce local flooding
behind the modified levee sections and
ensure compliance with associated
regulatory criteria. (Please refer to
Section 3.1.3.6 for more detail)
No mitigation
required.

The proposed trail would be located on top of the
west bank levee of the Sacramento River.

Therefore, the project site is not located within a
flood zone because it is an area protected from
flooding by a levee. Additionally, all fill from paving would occur on the inland side of the levee.

The proposed project would not substantially
increase the severity of the previously identified
impacts on flood risks nor result in new significant
impacts. With adherence to applicable regulatory
requirements there would be no new or
substantially more severe significant impacts.

No applicable
mitigation
measures.

Significance Criteria (FR-2):

Decrease in Risk of Levee
Failure as a Result of Erosion
or Seepage
Impact FR-2: The approved project
identified no impact to a risk of levee
failure as a result of erosion or seepage.

Implementation of the approved project
would construct a new raised adjacent
levee to decrease erosion. The new
adjacent levee would not change the
existing potential for through- and
under-seepage potential. This flood
risk–reduction measure would not
result in any long-term changes to the
overall existing drainage pattern of the
Sacramento River. Additionally, the
direct effect of the approved project on
the levee would be beneficial; there is
no indirect effect on upstream or
downstream levees. (Please refer to
Section 3.1.3.6 for more detail.)
No mitigation
required.

The proposed trail would be located on top of the
approved project. Although the proposed project
involves the construction of recreational multi-use
trail and associated improvements along the
existing levee alignment, construction of the
approved project would not change the existing
potential for through- or under-seepage or increase
the risk of levee failure as construction of the
proposed project would only include minor grading
activities on the levee itself. No in water work is
anticipated.

However, construction of the proposed project
would disturb more than 1 acre of soil, temporarily
altering drainage patterns and increasing the
potential for soil erosion and siltation.

Implementation of Regulatory Compliance
Measure (RCM) HYD-1, which requires the
preparation of a Stormwater Pollution Prevention
Plan (SWPPP), and RCM HYD-2, which consists of
No applicable
mitigation
measures.

New Regulatory
Compliance
Measures:

RCM HYD-1
through RCM-4
(refer to
Attachment A)
156
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 12 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Erosion and Sediment Control measures to
minimize erosion that would reduce the potential
of erosion.

Additionally, operational impacts of the proposed
project would be reduced with implementation of
RCM HYD-3 which requires the preparation and
implementation of a Final Storm Water
Management Plan (SWMP) SWMP and RCM HYD-4,
which requires preparation and implementation of
a Runoff Control Plan per Section 15.08.280 of the
West Sacramento Municipal Code.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified levee or erosion or impacts nor result in
new significant impacts. With adherence to
applicable regulatory requirements, there would be
no new or substantially more severe significant
impacts.

Significance Criteria (FR-3):

Alteration of Existing
Drainage Pattern of Site or
Area
Impact FR-3: The approved project
identified less than significant impacts
with mitigation incorporated related to
the alteration of existing drainage
patters or site area. The approved
project would implement flood risk–
reduction measures and recreational
elements which would involve
earthwork on the top of the levee and
the landward side of the levee. These
additions along with the adjacent
modified levee could alter the course of
local runoff. Implementation of
Mitigation Measure (MM) FR-MM-1
would reduce direct and indirect effects
While the
approved project
prescribed
Mitigation
Measure FR-MM1, this mitigation
measure is not
applicable to the
proposed project.

The proposed trail would be located on top of the
approved project. The proposed project involves
the construction of recreational multi-use trail and
associated improvements along the existing levee
alignment of the approved project. The proposed
project would only temporarily alter drainage
patterns during grading and other construction
activities, as construction activities would only
occur on the top of the levee.

The proposed project would not include major
levee alterations as discussion in the approved
project. However, construction-related pollutants
could be spilled, leaked, or transported via storm
runoff into adjacent drainages and downstream
receiving waters. Implementation of RCM HYD-1
No applicable
mitigation
measures.

New Regulatory
Compliance
Measures:

RCM HYD-1 and
RCM HYD-2
(refer to
Attachment A)
157
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 13 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
to a less than significant level. (Please
refer to Section 3.1.3.6 for more detail.)
and RCM HYD-2 would reduce construction impacts
related to on- or off-site erosion or siltation to less than significant.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified drainage impacts nor result in new
significant impacts. With adherence to applicable
regulatory requirements, there would be no new or
substantially more severe significant impacts.

Significance Criteria FR-4:

Increase in Channel Bed
Incision and Bank Erosion
Attributable to Heightened
Levees
Impact FR-4: The approved project
identified less than significant impacts
to bank erosion and no impacts to
channel bed incision. Implementation of
the approved project would create a
more erosion-resistant levee, benefiting
existing bank erosion rates. There
would be no direct effect on channel
bed incision in the approved project
reach, or an indirect effect downstream.

Construction of the approved project
would include the removal and
reduction of riparian vegetation which
could increase bank erosion through
loss of vegetation and disruption of soil
structure. However, these effects are
not considered adverse because
geotechnical bank stabilization (through
either bioengineering or hardscape
methods) would be required after
vegetation removal. As such, the
approved project would not
substantially impact bank erosion.

No mitigation
required.

The proposed project involves the construction of
recreational multi-use trail and associated
improvements along the existing levee alignment of
the approved project and would not include any in
channel work or modify the height of the existing
levee. However, construction of the proposed
project will disturb more than 1 acre of soil,
temporarily altering drainage patterns and
increasing the potential for soil erosion and
siltation.

Implementation of RCM HYD-1, which requires the
preparation of a Stormwater Pollution Prevention
Plan (SWPPP), and RCM HYD-2, which consists of
Erosion and Sediment Control measures to
minimize erosion and retain sediment on site, along
with Good Housekeeping Best Management
Practices (BMPs) to prevent spills and the discharge
of debris into receiving waters.

The proposed project would not substantially
increase the severity of the previously identified
channel bed incision and bank erosion impacts nor
result in new significant impacts. With adherence to
applicable regulatory requirements there would be
No applicable
mitigation
measures.

New Regulatory
Compliance
Measures:

RCM HYD-1 and
RCM HYD-2
(refer to
Attachment A)
158
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 14 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
no new or substantially more severe significant
impacts.

Significance Criteria FR-7:

Change in Stream Energy
and Modification of
Floodplain Scour Deposition
Impact FR-7: The approved project
identified that impacts to changes in
stream flow and modification of
floodplains would be less than
significant with mitigation
incorporated. Implementation of the
approved project would result in a slight
reduction in stream energy due to the
increased conveyance area, which
would decrease shear stresses along the
channel. Reduction in stream energy is
not expected to cause significant
changes in erosion or deposition
patterns. Additionally, the approved
project would not result in substantial
modifications to floodplain scour or
deposition, as flood flows would
continue to behave similarly to existing
conditions. However, Mitigation
Measure FR-MM-2 would be required
to reduce impacts to disruptions to
geomorphic landforms and associated
riparian vegetation from construction
activities to a less than significant level.
(Please refer to Section 3.1.3.6 for more
detail.)
While the
approved project
prescribed
Mitigation
Measure FR-MM2, this mitigation
measure is not
applicable to the
proposed project.

The proposed project would be located on top of
the existing west bank levee of the Sacramento
River. The proposed project would not change the
upstream and downstream flows of the Sacramento
River as the proposed project would only include a
paved multi-use trail on the existing levee and
associated improvements. Additionally, the project
site is not located within a flood zone because it is
an area protected from flooding by a levee.

Therefore, the proposed project would not impede
or redirect flood flows.

The proposed project would not substantially
increase the severity of the previously identified
stream energy or floodplain scour deposition
impacts nor result in new significant impacts. With
adherence to applicable regulatory requirements
there would be no new or substantially more
severe significant impacts.

No applicable
mitigation
measures.

Water Quality and Groundwater Resources
Significance Criteria WQ-1:

Effects on Surface Water
Quality from Excessive
Turbidity or Total
Suspended Solids
Impact WQ-1: The approved project
identified less than significant impacts
to surface water quality from excessive
turbidity or total suspended solids.

Construction of the approved project
would involve the placement of
No mitigation
required.

Construction of the proposed project would result
in the construction of trail improvements (e.g., site
access, parking, rest stop bulb-outs, signage and
monuments) on top of the approved project.

Construction of the proposed project would result
in the disturbance of approximately 11.25 acres of
No applicable
mitigation
measures.
159
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 15 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
segments of the setback levee and
breaching and degradation of the
existing levee and excavation of
adjacent soils to restore the historical
Sacramento River floodplain.

Additionally, construction of the
approved project could involve storage
and use of toxic and other harmful
substances near the Sacramento River
(or in areas that drain to the
Sacramento River or other water
bodies), which could result in discharge
of these substances to the Sacramento
River or other water bodies.

Implementation of the prescribed
Environmental Controls (ECs), such as
the preparation of a SWPPP and
turbidity monitoring from the approved
project, would reduce impacts to
increases in turbidity or suspended
solids to less than significant. (Please
refer to Section 3.2.3.6 for more detail.)
land. The proposed project would not require any
groundwater dewatering.

Similar to the approved project, pollutants of
concern during construction include sediments,
trash, petroleum products, concrete waste (dry and
wet), sanitary waste, and chemicals. Each of these
pollutants on its own or in combination with other
pollutants can have a detrimental effect on water
quality. During construction activities, excavated
soil would be exposed, and there would be an
increased potential for soil erosion and
sedimentation compared to existing conditions.

In addition, chemicals, liquid products, petroleum
products (e.g., paints, solvents, and fuels), and
concrete-related waste may be spilled or leaked,
and they have the potential to be transported via
stormwater runoff into receiving waters.

Implementation of RCM HYD-1, which requires the
preparation of a Stormwater Pollution Prevention
Plan (SWPPP), and RCM HYD-2, which consists of
Erosion and Sediment Control measures to
minimize erosion and retain sediment on site, along
with Good Housekeeping BMPS practices to
prevent spills and the discharge of debris into
receiving waters would reduce construction
impacts to surface waters. Additionally, pollutants
of concern from long-term operations include
pathogens (bacteria/viruses), metals, nutrients,
motor vehicle lubricants, toxic organic compounds,
pesticides/herbicides, sediments/total suspended
solids, trash and debris, and oil and grease.

Compliance with RCM HYD-3 and RCM HYD-4 and
the requirements of the MS4 Permit and West
Sacramento Municipal Code would ensure that
New Regulatory
Compliance
Measures:

RCM HYD-1
through RCM
HYD-4 (refer to
Attachment A)
160
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 16 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
operational impacts to water quality would be less
than significant.

The proposed project would not substantially
increase the severity of the previously identified
water quality impacts nor result in new significant
impacts. With adherence to applicable regulatory
requirements there would be no new or
substantially more severe significant impacts.

Significance Criterion WQ-2:

Release of Contaminants
into Adjacent Surface Water
Bodies from ConstructionRelated Hazardous Materials
Impact WQ-2: The approved project
identified less than significant impacts
to the release of contaminants into
surface water. As described in Impact
WQ-1, above, the approved project has
potential to release constructionrelated contaminants into adjacent surface water bodies; However,
development of a SWPPP, Spill
Prevention Control and
Countermeasures (SPCCP), a bentonite
slurry spill contingency plan (BSSCP),
and a turbidity monitoring program
would ensure that direct and indirect
effects less than significant. (Please
refer to Section 3.2.3.6 for more detail.)
No mitigation
required.

As described above, similar to the approved project,
construction of the proposed project could lead to
spilled or leaked chemicals, liquid products,
petroleum products (e.g., paints, solvents, and
fuels), and concrete-related waste which has the
potential to be transported via stormwater runoff
into receiving waters.

Implementation of RCM HYD-1, which requires the
preparation of a Stormwater Pollution Prevention
Plan (SWPPP), and RCM HYD-2, which consists of
Erosion and Sediment Control measures to prevent
spills and the discharge of debris into receiving
waters would reduce construction impacts to
surface waters. Additionally, operation of the
proposed project could lead to pollutants of
concerns such as pathogens (bacteria/viruses),
metals, nutrients, motor vehicle lubricants, toxic
organic compounds, pesticides/herbicides,
sediments/total suspended solids, trash and debris,
and oil and grease, entering the surface waters.

Compliance with RCM HYD-3 and RCM HYD-4 and
the requirements of the MS4 Permit and West
Sacramento Municipal Code would ensure that
operational impacts to water quality would be less
than significant.

No applicable
mitigation
measures.

New Regulatory
Compliance
Measures:

RCM HYD-1
through RCM
HYD-4 (refer to
Attachment A)
161
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 17 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
The proposed project would not substantially
increase the severity of the previously identified
water quality impacts nor result in new significant
impacts. With adherence to applicable regulatory
requirements there would be no new or
substantially more severe significant impacts.

Significance Criterion WQ-3:

Effects on Groundwater or
Surface Water Quality
Resulting from Contact with
the Water Table
Impact WQ-2: The approved project
identified that impacts to groundwater
or surface water quality would be less
than significant with mitigation
incorporated.

Construction of the approved project
would involve trenching and excavation
associated with a cutoff wall and/or
levee reconstruction. The activities
proposed under the approved project
could expose the water table and create
a path to the groundwater basin that
would allow contaminants to enter the
groundwater system. In addition,
dewatering of the construction area and
borrow sites could result in the release
of contaminants to surface or
groundwater. Uncapped groundwater
wells located near construction
activities could also provide a direct
path to the aquifer. (Please refer to
Section 3.2.3.6 for more detail.)
While the
approved project
prescribed
Mitigation
Measure WQ-MM1, this mitigation
measure is not
applicable to the
proposed project.

Generally, only minor grading would be required for
site preparation and ground disturbance associated
with the proposed project, such as paving the trail,
parking and associated ramps. Excavation would
only be required for signage, which would require
excavation to a maximum depth of 14 inches, and
the proposed project would not require any
groundwater dewatering. Therefore, construction
of the proposed project would not substantially
decrease groundwater supplies.

Operation of the proposed project would not
involve the use of groundwater as no potable or
non-potable water facilities would be provided as
part of the proposed project. Development of the
proposed project would result in an increase in
impervious surfaces on the project site which could
reduce groundwater recharge compared to existing
conditions. However, compliance with RCM HYD-3,
which requires the preparation and implementation
of an SWMP, and RCM HYD-4 which requires the
preparation and implementation of a Runoff
Control Plan per Section 15.08.280 of the West
Sacramento Municipal Code would reduce these
impacts.

No applicable
mitigation
measures.

New Regulatory
Compliance
Measures:

RCM HYD-3,
RCM HYD-4
(refer to
Attachment A)
162
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 18 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criteria WQ-4:

Effects on Groundwater
Levels and Quality from
Construction of Slurry Cutoff
Walls
The approved project identified that
impacts to groundwater levels from
construction would be less than
significant.

The approved project would construct
slurry cutoff walls for the entire length
of the setback levee with levee
segments ranging from 24 feet in depth
to 84 feet in depth. Changes to
groundwater levels would not
significantly affect the aquifer or
groundwater quality. (Please refer to
Section 3.2.3.6 for more detail.)
No mitigation
required.

The proposed project would result in the
construction of trail improvements (e.g., site access,
parking, rest stop bulb-outs, signage and
monuments) on top of the approved project
alignment. Construction of the proposed project
would not result in any changes to groundwater
levels or groundwater quality as the proposed
project does not involve any in water work or
construction/modification to the exiting slurry
cutoff walls.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with groundwater levels nor
result in new significant impacts.

No mitigation
required.

Significance Criterion WQ-5:

Release of Contaminants
into Adjacent Surface Water
Bodies from Disturbance of
Existing Ambient
Contaminants
WQ-5: The approved project identified
less than significant impacts to the
contamination of adjacent surface
water bodies from ambient
contaminants. Construction of the
approved project would involve
excavation and breaching of the existing
levee to create a shallow floodplain
these activities would expose adjacent
surface waters to hazardous
contaminants and or materials.

Implementation of the prescribed ECs
under the approved project such as a
Soil Hazards Testing and a Soil Disposal
Plan would reduce impacts from soil
contamination to a less than significant
level. (Please refer to Section 3.2.3.6 for
more detail.)
No mitigation
required.

As described above in Impact WQ-2, construction of
the proposed project could lead to spilled or leaked
chemicals, liquid products, petroleum products
(e.g., paints, solvents, and fuels), and concreterelated waste which has the potential to be transported via stormwater runoff into receiving
waters.

Implementation of RCM HYD-1, which requires the
preparation of a Stormwater Pollution Prevention
Plan (SWPPP), and RCM HYD-2, which consists of
Erosion and Sediment Control measures to prevent
spills and the discharge of debris into receiving
waters, would reduce construction impacts to
surface waters. Additionally, operation of the
proposed project could lead to pollutants of
concerns such as pathogens (bacteria/viruses),
metals, nutrients, motor vehicle lubricants, toxic
organic compounds, pesticides/herbicides,
sediments/total suspended solids, trash and debris,
and oil and grease, entering the surface waters.

New Regulatory
Compliance
Measures:

RCM HYD-3,
RCM HYD-4
(refer to
Attachment A)
163
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 19 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Compliance with RCM HYD-3 and RCM HYD-4 and
the requirements of the MS4 Permit and West
Sacramento Municipal Code would ensure that
operational impacts to water quality would be less
than significant.

Additionally, excavation of the proposed project
would only be for signage. No in water work or
major levee modifications are anticipated.

The proposed project would not substantially
increase the severity of the previously identified
water quality impacts nor result in new significant
impacts. With adherence to applicable regulatory
requirements there would be no new or
substantially more severe significant impacts.

Geology, Seismicity, Soils and Mineral Resources
Significance Criterion GEO-3:

Potential Earthquake
Damage to Flood
management Structures
Impact GEO-3: The approved project
identified that impacts related to
earthquake damage from
implementation of the approved project
would be less than significant.

The approved project is located in a
region of California characterized by low
seismic activity. The approved project
area is not identified as being located in
an Alquist-Priolo Earthquake Fault Zone.

The active fault nearest to the project
area is the Dunnigan Hills fault, which is
30 miles to the northwest.

While the risk of ground shaking in
approved project area is low, a large
earthquake on a regional fault could
cause moderately severe ground
shaking in the approved project area,
No mitigation
required.

Similar to the approved project no faults are
located within the City of West Sacramento, with
the nearest faults (Midland and East Valley) being
located approximately 15 miles to the east in the
City of Dixon. Due to distance to the nearest fault,
implementation of the project would not increase
risks to human health or safety related to fault
rupture compared to existing conditions. Therefore,
this impact would be less than significant.

Additionally, the California Geological Survey (CGS)
has mapped Seismic Hazard Zones that delineate
areas susceptible to liquefaction and/or landslides
that require proposed new developments in these
areas to conduct additional investigation to
determine the extent and magnitude of potential
No mitigation
required.
164
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 20 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
which could result in liquefaction or
associated ground failure, such as
lateral spreading or differential
settlement, which in turn could result in
direct structural damage or indirectly
contribute to the structural degradation
of flood management structures.

Additionally, because of the relatively
small likelihood of coincidence of large
floodflow and a major earthquake, the
potential for failure or significant
damage of the approved project
structures is low. (Please refer to
Section 3.3.3.6 for more detail.)
ground failure. According to mapping by CGS,4 the
proposed project is not located in areas mapped as
hazards for liquefaction and landslide.

Implementation of the proposed project would not
be in areas with potentially adverse geological
conditions, including liquefaction; therefore,
impacts are less than significant.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with earthquake damage and
flooding nor result in new significant impacts.

Significance Criteria GEO-4:

Accelerated Erosion and
Sedimentation Resulting
from Construction-Related
Ground
Disturbance
Impact GEO-4: The approved project
identified that construction of the levee
would result less than significant
impacts to erosion and sedimentation
from ground disturbance. Construction
of the approved project would include
substantial earthwork and vegetation
disturbance at the levee sites. The
approved project would involve up to
491 acres of ground disturbance (26
acres of temporary and 465 acres of
permanent ground disturbance). With
implementation of the prescribed ECs
such as the preparation of an SWPPP,
impacts would be less than significant.

No mitigation
required.

Exposed soils could be subject to erosion during
installation of improvements for the proposed
project. Exposed soils could be entrained in storm
water runoff and transported off the project site.

The potential for soil erosion exists during the
period of earthwork activities and between the
time when earthwork is completed, and new
vegetation is established. As specified in Impact
WQ-2, RCM HYD-1 and RCM HYD-2 would require
the preparation of a SWPPP and Erosion and
Sediment Controls to reduce any potential soil
erosion impacts to less than significant.

The proposed project would not substantially
increase the severity of the previously identified
erosion or sedimentation impacts nor result in new
significant impacts. With adherence to applicable
No mitigation
required.

New Regulatory
Compliance
Measures:

RCM HYD-1 and
RCM HYD-2
(refer to
Attachment A)
4 California Geological Survey (CGS). 2019. California Earthquake Hazards Zone Application. Website: maps.conservation.ca.gov/cgs/EQZApp/app/ (accessed February 9, 2023).
165
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 21 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
(Please refer to Section 3.3.3.6 for more
detail.)
regulatory requirements there would be no new or
substantially more severe significant impacts.

Significance Criteria GEO-5:

Potential Structural Damage
from Encountering
Expansive Soils
Impact GEO-5: The approved project
identified less than significant impacts
to structural damage from expansive
soils. The approved project
encountered expansive soil and
sediments at various depths below the
levees in the project area during
geotechnical investigations. The
expansive soils within the project site
could affect the structural integrity of
the slurry walls, relocated utilities, and
any future development in borrow
areas. To prevent issues related to
expansive soils, WSAFCA would
continuously monitor expansiveness of
project area soils based on existing or
new soil borings as construction
proceeds. (Please refer to Section

3.3.3.6 for more detail.)
No mitigation
required.

Soils within the proposed project consist of an
approximately 14-inch layer of aggregate base on
top of the levee on which the new trail would be
constructed. Levee soils are typically silty sand and
poorly graded clean sand. Beneath the levee
materials, the typical soil profile consists of a layer of fine-grained silt or clay (interpreted to be over
bank deposits) underlain by up to 100 feet of sand
and gravel, with interbedded silty sand and clayey
sand layers. Similar to the approved project some of
these on the proposed project site include
moderate to high shrink-swell potential (expansion
and contraction cycle when wetted and dried) and
would be considered expansive soils. With
conformance with the California Building Code,
impacts related to expansive soils would be less
than significant.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with expansive soils nor result in
new significant impacts. With adherence to
applicable regulatory requirements there would be
no new or substantially more severe significant
impacts.

No mitigation
required.

Significance Criterion GEO6: Decrease in Supply of
Mineral Soil as a Result of Its
Use for Levee Material
Impact GEO-6: The approved project
identified less than significant impacts
to the decrease in mineral supplies as a
result of project implementation. The
approved project would involve the
excavation and use of 2.4 million cubic
yards of mineral soil to implement flood
risk–reduction measures. The approved
No mitigation
required.

The proposed project would only include minor
grading for site preparation and ground disturbance
associated with paving the trail, parking and
associated ramps. All fill from paving would occur
on the inland side of the levee. A total of 11.25
acres of land would be disturbed during
construction activities. Approximately 650 cubic
yards of fill soil would be imported for the northern
No mitigation
required.
166
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 22 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
project area is classified as Mineral
Resource Zone (MRZ) -1 (which
indicates no significant mineral deposits
are present) and MRZ-3 (which means
aggregate deposits of undetermined
significance occur there). Lands
classified as MRZ-1 or MRZ-3 are not
affected by State policies pertaining to
the maintenance of access to regionally
significant mineral deposits under the
California Surface Mining and 28
Reclamation Act of 1975. As such, the
approved project would not result in
the loss or availability of a known
mineral resource that would be of value
to the region and the residents of the
State, other than for the purposes
purposed. (Please refer to Section

3.3.3.6 for more detail.)
connection point and the connection of the
Southport Trail and Clarksburg Branch Line Trail.

Additionally, similar to the approved project the
proposed project area is classified as MRZ-3, which
means aggregate deposits of undetermined
significance occur there. The project area also
contains discontinuous pockets of sand; therefore,
the project area could not be effectively or
economically mined and is considered not to
contain regionally or locally important mineral
resources, 5 and there would be no impact.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with mineral resources nor
result in new significant impacts.

Transportation and Navigation
Significance Criterion TRA1: Temporary Increase in
Traffic Volumes from
construction-Generated
Traffic
Impact TRA-1: The approved project
identified significant and unavoidable
impacts to construction traffic.

Construction of the approved project
would generate numerous vehicles trips
along haul routes in West Sacramento,
several of which currently have an
unacceptable level of service (LOS). The
increase in vehicle trips would increase
traffic volumes, which would result in a
significant effect on traffic operation on
No feasible
mitigation
measures.

Construction of the proposed project would be
located in the same location as the approved
project; however, the approved project would
include minor modifications to the existing levee
similar construction equipment that could create
impacts to emergency response times during
construction. Like the proposed project,
construction activities associated with the revised
project would be conducted between the hours of
7:00 a.m. and 6:00 p.m., Monday through Friday
and between the hours of 9:00 a.m. and 6:00 p.m.

No mitigation
required.
5 U.S. Army Corps of Engineers and West Sacramento Area Flood Control Agency. 2013. Draft Southport Sacramento River Early Implementation Project Environmental Impact Statement/Environmental Impact Report. November. 167
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 23 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
project haul routes. Although WSAFCA
would implement the traffic control and
maintenance ECs, this impact was still
determined to be significant. (Please
refer to Section 3.4.3.6 for more detail.)
on Saturdays, except when traffic or safety warrant
alternate hours.

The proposed project would not substantially
increase the severity of the previously identified
traffic impacts nor result in new significant impacts.

Significance Criterion TRA2: Temporary Road ClosuresThe approved project identified that impacts related to temporary road
closures would be less than significant.

Construction of the approved project
would include temporary road closures
during construction of portions of
Village Parkway, Linden Road, Davis
Road, Gregory Avenue, and Burrows
Avenue adjacent to the approved
project sites. Temporary road closures
would require a detour of normal traffic
to adjacent streets. The detouring of
traffic would increase daily traffic
volumes on roads in the surrounding
areas. The approved project would
require the development and
implantation of a traffic control and
road maintenance plan, as described
the prescribed ECs to ensure impacts
would be less than significant. (Please
refer to Section 3.4.3.6 for more detail.)
No mitigation
required.

The proposed project would be located in same
location as the approved project. The proposed
project would involve the construction of a
recreational multi-use trail and associated
improvements along an existing levee alignment,
from the northern terminus at South River Road
and Stonegate Drive south to the southern
terminus at South River Road. The proposed project
would not include any road closures or traffic
detours. Therefore, there would be no impacts.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with road closures nor result in
new significant impacts.

No mitigation
required.

Significance Criterion TRA3: Increase in Safety Hazards Attributable to
Construction-Generated
Traffic
Impact TRA-3: The approved project
identified less than significant impacts
to safety hazards. Construction of the
approved project would involve the
maneuvering of construction-related
vehicles and equipment among generalpurpose traffic on local roads that provide access to the project. These
No mitigation
required.

The proposed project would be located in same
location as the approved project. The proposed
project would result in the construction of trail
improvements (e.g., site access, parking, rest stop
bulb-outs, signage and monuments) on top of the
approved project. Implementation of the proposed
project would not significantly alter public
roadways, except to provide safer connections to
No mitigation
required.
168
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 24 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
construction vehicles could cause safety
hazards. However, with implementation
of a traffic control and road
maintenance plan would minimize
construction-related traffic hazards to
less than significant. (Please refer to
Section 3.4.3.6 for more detail.)
the proposed trail at roadway crossings at the
Chicory Road Loop. The proposed trail alignment
would be located on an existing levee, on existing
public roadways, and in open space areas, and
would be compatible with surrounding land uses.

As such, the proposed project would not result in
hazards due to incompatible uses (e.g., farm
equipment). Therefore, the proposed project would
result in a less than significant impact related to
hazards associated with a design feature or
incompatible uses.

The proposed project would not substantially
increase the severity of the previously identified
erosion or sedimentation impacts nor result in new
impacts associated with traffic hazards.

Significance Criterion TRA4: Disruption of Alternative Transportation Modes as a
Result of Temporary Road
Closures
Impact TRA-3: The approved project
identified less than significant impacts
to the disruption of alternative modes
of transportation due to road closures.

Construction of the approved project
would include Temporary Road closures
along South River Road, Linden Road,
Gregory Avenue, and Burrows Avenue
adjacent to the project sites. Closure of
these roadways could interfere with
bicycle travel along these roads.

Implementation of the traffic control
and road maintenance plan would
minimize construction-related traffic
conflicts with bicycle travel. (Please
refer to Section 3.4.3.6 for more detail.)
No mitigation
required.

The proposed project would not result in any
temporary or permanent road closures and would
not result in the disruption of alternative modes of
transportation. Additionally, the proposed project
would be consistent with the City of West
Sacramento General Plan, the Bicycle, Pedestrian,
and Trails Master Plan (BPTMP), and the City of
West Sacramento Parks, Recreation and Open
Space Master Plan (PROSMP) policies that promote
alternative transportation modes. Therefore, the
proposed project would not conflict with a program
plan, ordinance, or policy addressing the circulation
system, including transit, roadway, bicycle, and
pedestrian facilities.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with road closures nor result in
new significant impacts.

No mitigation
required.
169
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 25 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion
TRA-6: Permanent Changes
in Circulation Patterns
The approved project identified that
implementation of the approved project
would result in less than significant
impacts to permutants changes to
circulation patterns. Implementation of
the approved project would realign
South River Road to join with Village
Parkway at the north end of the project
area and would continue along the
reserved right-of-way of the planned
Village Parkway extension. The new
road would be two lanes and would be
designed to meet traffic demands for
both South River Road and the existing
Village Parkway. The road would
maintain the reserved right-of-way for
the planned Village Parkway and allow
expansion to meet future circulation
needs. (Please refer to Section 3.4.3.6
for more detail.)
No mitigation
required.

Implementation of the proposed project would not
significantly alter public roadways; however, it
would improve safety by enhancing connections to
the trail at roadway crossings at Chicory Road Loop.

These improvements would consist of crosswalks
and associated traffic signage (for both trail users
and roadway users). The proposed trail alignment
would be located on an existing levee, the same
location as the approved project, on existing public
roadways, and in open space areas. Additionally,
the proposed project would not construct a new
roadway or realign any existing roadways. The
project would be consistent with the City of West
Sacramento General Plan, BPTMP, and PROSMP
policies that promote alternative transportation
modes. Therefore, the proposed project would not
conflict with a program plan, ordinance, or policy
addressing the circulation system, including transit,
roadway, bicycle and pedestrian facilities and
impact would be less than significant.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with changes in circulation
patterns nor result in new significant impacts.

No mitigation
required.

Air Quality
Significance Criterion AIR-1:

Conflict with or Obstruct
Implementation of an
Applicable Air Quality Plan
Impact AIR-1: The approved project
identified that implementation of the
approved project would not conflict
with or obstruct an applicable air quality
plan and impacts would be less than
significant. The approved project is
located in the Yolo County, which is
located in the Sacramento Valley Air
Basin (SVAB) and is within the
No mitigation
required.

The proposed project would be located in the same
location as approved project and would be located
within the SVAB. Currently, the SVAB is currently
designated “non-attainment” for State and federal
ozone standards, the State particulate matter less
than 10 microns in size (PM10)standard and federal
particulate matter less than 2.5 microns in size
(PM2.5) standard. The SVAB is designated
170
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 26 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
jurisdiction of the Yolo-Solano Air
Quality Management District
(YSAQMD). The approved project would
be consistent with the 2035
Metropolitan Transportation Plan as the
Plan meets the emission conformity test
for the Sacramento ozone nonattainment area. Therefore, operation of the approved project would not
conflict with or obstruct the
implementation of air quality plans.
(Please refer to Section 3.5.3.6 for more
detail.)
“attainment” or “unclassified” with respect to the
other ambient air quality standards.

While the approved project determined its
consistency based on the 2035 Metropolitan
Transportation Plan, this plan is no longer
applicable to the proposed project. The applicable
air quality plan for the proposed project is the 2017
Sacramento Regional 2008 8-Hour Ozone and
Further Reasonable Progress Plan (2017 Ozone
Plan). The 2017 Ozone Plan contains emissions
inventories based on existing and foreseeable
future land uses within its jurisdiction. If a new
project is consistent with the planned land use
designation that was considered in the
development of an air quality management plan,
the proposed project would not conflict and would
not obstruct implementation of the applicable air
quality management plan.

The proposed project involves the construction of a
recreational trail and associated improvements
along an existing levee alignment from the northern
terminus at South River Road and Stonegate Drive
south to the southern terminus at South River
Road. The proposed trail would not conflict with
the City of West Sacramento General Plan land use
plan designations or zoning. In addition, as
discussed below, the proposed project would not
generate emissions that would exceed YSAQMD
thresholds.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified air quality impacts nor result in new
significant impacts.
171
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 27 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion AIR-2:

Violate Any Air Quality
Standard or Substantial
Contribution to Existing or
Projected Air Quality
Violation
Impact AIR 2: The approved project
identified that the proposed project
would violate air quality standards and
lead to air quality violations. Impacts
would be significant. While
implementation of Mitigation
Measures AIR-MM-1 through AIR-MM5 would reduce nitrogen oxide (NOx) emissions to a less than significant
level, PM10 emissions in YSAQMD would
still exceed applicable air district
thresholds and therefore, impacts to air
quality would be significant and
unavoidable. (Please refer to Section

3.5.3.6 for more detail.)
While the
approved project
prescribed
Mitigation
Measures AIRMM-1 through
AIR-MM-5, these
mitigation
measures are not
applicable to the
proposed project.

The YSAQMD is currently designated as a nonattainment area for State and national PM2.5 and ozone (O3) standards. The YSAQMD non-attainment
status is attributed to the region’s development
history.

Table C: YSAQMD Thresholds of Significance for
Criteria Pollutants of Concern
Pollutant Thresholds of
Significance
ROG 10 tons per year
NOx 10 tons per year
PM10 80 pounds per day
CO Violation of a State
ambient air quality
standard for CO
Source: YSAQMD. 2007. Handbook for Assessing and Mitigating Air Quality Impacts. July 11. Website: https://yolosolanoair. wpenginepowered.com/wp-content/uploads/Planning/CEQA
Handbook2007.pdf (accessed April 2023).

CO = carbon monoxide
NOx = nitrogen oxide
PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gases
Construction Emissions. During construction
activities, short-term degradation of air quality may
occur due to the release of particulate matter
emissions (i.e., fugitive dust) generated by grading,
hauling, and other activities. Emissions from
construction equipment are also anticipated and
would include CO, nitrogen oxide (NOX), reactive
organic gases (ROG), directly emitted particulate
matter (PM2.5 and PM10), and toxic air contaminants
(TACs) such as diesel exhaust particulate matter.

Construction-related emissions are presented in
New Mitigation
Measures:

Mitigation
Measure AIR-1
(refer to
Attachment A)
172
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 28 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Table D, below (prefer to Attachment B CalEEMod
Worksheets for more detail).

Table D: Project Construction Emissions
Maximum Daily Emissions
(pounds per day)
ROG NOx CO PM2.5 PM10
Maximum Daily 1.8 49.8 41.0 9.2 78.2
YSAQMD
Significance
Threshold
N/A N/A N/A N/A 80
Above
Threshold?
N/A N/A N/A N/A No
Annual Emissions
(tons per year)
ROG NOx CO PM2.5 PM10
Maximum
Annual
Emissions

0.1 2.8 2.2 0.6 5.1
YSAQMD
Significance
Threshold
10 10 N/A N/A N/A
Above
Threshold?
No No N/A N/A N/A
Source: LSA (September 2024).

CalEEMod = California Emissions Estimator Model
CO = carbon monoxide
N/A = not applicable
NOx = nitrogen oxide
PM2.5 = particulate matter less than 2.5 microns in size PM10 = particulate matter less than 10 microns in size
ROG = reactive organic gases
As shown in Table D, maximum daily emissions from
project construction would be 78.2 pounds/day for
PM10, which is below the threshold of 80 pounds/day
for PM10. Additionally, as shown in Table D, the
annual emissions from project construction would be
173
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 29 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures

0.1 tons/year for ROG and 2.8 tons/year for NOx,
which is below the threshold of 10 tons/year for ROG
and NOX. According to the YSAQMD’s CEQA
Handbook, even projects not exceeding district
thresholds should implement best management
practices to reduce fugitive dust emissions and avoid
localized health impacts. Common measures include
watering, chemical stabilization of soils or stockpiles, and reducing surface wind speeds with windbreaks.

As such, implementation of Mitigation Measure AIR1, would ensure compliance with YSAQMD recommended best management practices for
fugitive dust control and would reduce impacts to
less than significant.

Operational Emissions. Long-term air emission
impacts are associated with stationary sources and
mobile sources. The project would not result in a
substantial increase in the generation of operational
vehicle trips or vehicle miles traveled that would
substantially increase air pollutant emissions. The
project would not be a source of stationary source
emissions.

The proposed project would not substantially
increase the severity of the previously identified air
quality impacts nor result in new significant impacts.

With implementation of Mitigation Measure AIR-1
there would be no new or substantially more severe
significant impacts.

Significance Criterion AIR-4:

Result in a Cumulatively
Considerable Net Increase of
Any Criteria Pollutant for
Which the Project Region is
Impact AIR 4: The approved project
identified significant impacts to the
cumulative and considerable net
increase of criteria pollutants. While
implementation of Mitigation
Measures AIR-MM-1 through AIR-MMWhile the
approved project
prescribed
Mitigation
Measures AIRMM-1 through
As stated above in Impact AIR-4, the proposed
project would not result in a cumulatively
considerable net increase of any criteria pollutant
for which the project region is non-attainment
under an applicable federal or State ambient air
quality standard with implementation of Mitigation
New Mitigation
Measures:

Mitigation
Measure AIR-1.
174
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 30 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
a Non-Attainment Area
under NAAQS
and CAAQS
5 would reduce NOx emissions to a less
than significant level, PM10 emissions in
YSAQMD would still exceed applicable
air district thresholds and; therefore,
impacts would to air quality would be
significant and unavoidable.

Construction of the approved project
would result in a significant cumulative
impact for NOx in the Sacramento
Metropolitan Air Quality Management
District (SMAQMD) and the Bay Area Air
Quality Management District
(BAAQMD), and NOx and PM10 in the
YSAQMD as both the NOx and PM10
emissions would exceed SMAQMD’s,
BAAQMD’s, and YSAQMD’s thresholds.
(Please refer to Section 3.5.3.6 for more
detail.)
AIR-MM-5, these
mitigation
measures are not
applicable to the
proposed project.

Measure AIR-1. Additionally, the proposed project
would not result in a substantial increase in the
generation of operational vehicle trips or vehicle
miles traveled that would substantially increase air
pollutant emissions. The project would not be a
source of stationary source emissions. Therefore,
operation of the proposed project would not result
in a cumulatively considerable net increase of any
criteria pollutant for which the project region is
non-attainment under an applicable federal or
State ambient air quality standards.

The proposed project would not substantially
increase the severity of the previously identified air
quality impacts nor result in new significant
impacts. With implementation of Mitigation
Measure AIR-1 there would be no new or
substantially more severe significant impacts.
(refer to
Attachment A)
Significance Criterion AIR-5:

Expose Sensitive Receptors
to
Substantial Fugitive Dust
Concentrations
Impact AIR-5: The approved project
identified that the exposure of sensitive
receptors to substantial fugitive dust
concentrations would result in less than
significant impacts with mitigation
incorporated.

Implementation of the approved project
would result in short-term dust
emissions from grading and earth
moving activities at the project
construction sites and the soil borrow
sites. Mitigation Measure AIR-MM-2
would reduce impacts to sensitive
receptors to a less than significant level
through implementation of a fugitive
While the
approved project
prescribed
Mitigation
Measure AIR-MM1, this mitigation
measure is not
applicable to the
proposed project.

Similar to the approved project, the proposed
project would involve construction activities that
may expose nearby sensitive receptors to airborne
particulates, as well as a small quantity of
construction equipment pollutants (i.e., usually
diesel-fueled vehicles and equipment). However,
construction contractors would be required to
implement construction fugitive dust impacts, as
required by Mitigation Measure AIR-1. With
implementation of Mitigation Measure AIR-1,
project construction emissions would be below
YSAQMD significance thresholds and the proposed
project.

The proposed project would not substantially
increase the severity of the previously identified air
quality impacts nor result in new significant
New Mitigation
Measures:

Mitigation
Measure AIR-1.
(refer to
Attachment A)
175
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 31 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
dust control plan. (Please refer to
Section 3.5.3.6 for more detail.)
impacts. With implementation of Mitigation
Measure AIR-1, there would be no new or
substantially more severe significant impacts.

Significance Criterion AIR-6:

Expose Sensitive Receptors
to Substantial Diesel
Particulate Matter
Concentrations
Impact AIR-6: The approved project
identified that the exposure of sensitive
receptors to substantial diesel
particulate matter concentrations
would result in less than significant
impacts with mitigation incorporated.
(Please refer to Section 3.5.3.6 for more
detail.)
Construction of the approved project
would result in short-term diesel
particulate emissions (DPM) from onsite heavy-duty equipment and on-road haul trucks. Nearby land uses, especially
those residences located downwind of
the project sites, could be exposed to
DPM generated during construction
activities, resulting in potential adverse
health effects. However, construction
activities along each levee segment are
not expected to take place for more
than 2 years, which is well below the
70-year exposure period often assumed
in chronic health risk assessment.

Moreover, sensitive receptors are not
located in proximity to the construction
area, construction activities would
occur linearly along the segment
alignment and would not occur over a
prolonged period in any one general
location, and all off-road diesel
equipment would comply with
While the
approved project
prescribed
Mitigation
Measure AIR-MM1, this mitigation
measure is not
applicable to the
proposed project.

Similar to the approved project, the proposed
project may expose nearby sensitive receptors to
airborne particulates, as well as a small quantity of
construction equipment pollutants (i.e., usually
diesel-fueled vehicles and equipment). However,
construction contractors would be required to
implement construction fugitive dust impacts, as
required by Mitigation Measure AIR-1.

Once the project is constructed, the project would
not be a source of substantial emissions. Therefore,
sensitive receptors are not expected to be exposed
to substantial pollutant concentrations during
project construction or operation, and potential
impacts would be considered less than significant.

The proposed project would not substantially
increase the severity of the previously identified air
quality impacts nor result in new significant
impacts. With implementation of Mitigation
Measure AIR-1, there would be no new or
substantially more severe significant impacts.

New Mitigation
Measures:

Mitigation
Measure AIR-1
(refer to
Attachment A)
176
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 32 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
California Air Resources Board (CARB)
regulations regarding consecutive idling.

Implementation of Mitigation Measure
AIR-MM-1 would reduce exhaust
emissions during construction to a less
than significant level. (Please refer to
Section 3.5.3.6 for more detail.)
Significance Criterion AIR-7:

Create Objectionable Odors
Affecting a Substantial
Number of People
Impact AIR-7: The approved project
identified that construction of the
approved project would result in less
than significant impacts with
mitigation incorporated to objectional
odors. Construction of the approved
project would generate odors
associated with diesel exhaust
emissions from onsite construction
equipment in the Sacramento Valley Air
Basin (SVAB). These odors may be
noticeable from time to time by
adjacent receptors. However, the odors
would be intermittent and temporary
and would dissipate rapidly from the
source with an increase in distance.

Furthermore, as required by CARB
regulation, no in-use off-road diesel
vehicles may idle for more than 5
consecutive minutes. Therefore, with
implementation of Mitigation
Measures AIR-MM-1 and AIR- MM-3,
this impact would be less than
significant. (Please refer to Section

3.5.3.6 for more detail.)
While the
approved project
prescribed
Mitigation
Measures AIRMM-1 and AIRMM-3, these
mitigation
measures are not
applicable to the
proposed project.

Similar to the approved project, the proposed
project would result in diesel exhaust from
construction equipment that would generate some
odors. However, construction-related odors would
be temporary and would not persist upon
construction completion.

Once operational, the proposed project would not
include any sources of odor emissions; therefore,
operation of the proposed project would not
generate any odor impacts. The proposed project
would not result in other emissions (such as those
leading to odors) adversely affecting a substantial
number of people.

The proposed project would not substantially
increase the severity of the previously identified air
quality impacts nor result in new significant
impacts.

No applicable
mitigation
measures.
177
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 33 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Climate Change
Significance Criterion CC-1:

Generate GHG Emissions
That May Have a Significant
Effect on the Environment
Impact CC-1: The approved project
identified that impacts related to the
generation of greenhouse gas (GHG)
emissions would be less than significant
with mitigation incorporated.

According to the approved project, the
YSAQMD, SMAQMD, and BAAQMD
have not formally adopted GHG
thresholds for construction
construction-related emissions.

Construction of the approved project
would generate construction emission
including carbon dioxide (CO2), methane
(CH4), nitrous oxide (N2O), and other
GHG emissions; however, project-wide
emissions would be below the
BAAQMD’s GHG threshold of 10,000
metric tons (MT) of carbon dioxide
equivalent (CO2e). While construction
emissions would be below the GHG
threshold, implementation of
Mitigation Measure CC-MM-1 would
further reduce GHG emissions during
construction. (Please refer to Section

3.6.3.6 for more detail.)
While the
approved project
prescribed
Mitigation
Measure CC-MM1, this mitigation
measure is not
applicable to the
proposed project.

Similar to the approved project, construction of the
proposed project would emit GHGs through the
operation of construction equipment and from
worker vehicles, each of which typically uses fossilbased fuels to operate.

Although the proposed project would involve
additional construction activities to construct a
paved multi-use trail with associated trail
improvements, this additional construction is not
anticipated to result in significant GHG impacts.

According to the CalEEMod for the proposed
project, it is estimated that construction of the
proposed project would generate approximately
645.8 metric tons of CO2e, which is below the
YSAQMD threshold (refer to Attachment B).

Therefore, project construction impacts associated
with GHG emissions would be considered less than
significant.

As such, the proposed project would not
substantially increase the severity of the previously
identified GHG impacts nor result in new significant
impacts.

No applicable
mitigation
measures.

Significance Criterion CC-2:

Conflict with an Applicable
Plan, Adopted for the
Purpose of Reducing GHG
Emissions
Impact CC-2: The approved project
would not conflict with an applicable
plan or adopted policy and, therefore,
would be less than significant. The
approved project would not conflict
with the goals of Assembly Bill (AB) 32,
the key elements and GHG reduction
measures in the Climate Change
No mitigation
required.

The proposed project is located in the Sacramento
Valley Air Basin (SVAB), which encompasses 11
counties including all of Shasta, Tehama, Glenn,
Colusa, Butte, Sutter, Yuba, Sacramento, and Yolo
counties, the westernmost portion of Placer County
and the northeastern half of Solano County and is
No mitigation
required.
178
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 34 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Scoping Plan, or any other local
jurisdiction plans for reduction or
mitigation of GHGs. Additionally,
construction emissions of the approved
project would be below the BAAQMD’s
significance thresholds. Therefore, the
approved project would not conflict
with or obstruct the implementation of
GHG emissions reduction plans. (Please
refer to Section 3.6.3.6 for more detail.)
within the jurisdiction of the Yolo-Solano Air Quality
Management District (YSAQMD).

Similar to the approved project, the proposed
project would not conflict with the goals of AB 32,
the key elements and GHG reduction measures in
the Climate Change Scoping Plan, or any other local
jurisdiction plans for the reduction or mitigation of
GHGs. While the proposed project would include
the construction of a multi-use trail and associated
improvements on top of the approved project, it
would support the ability to use alternative modes
of transportation, promote initiatives to reduce
vehicle trips and vehicle miles traveled, and
increase the use of alternate means of
transportation, which would help reduce GHG
emissions. The proposed project would implement
appropriate GHG reduction strategies and would
not conflict with applicable plans, policies, or
regulations pertaining to GHGs.

As such, the proposed project would not
substantially increase the severity of the previously
identified GHG impacts nor result in new significant
impacts.

Noise
Significance Criterion NOI-1:

Exposure of Sensitive
Receptors to Temporary
Construction-Related
Noise
Impact NOI-1: The approved project
identified significant impacts to
sensitive receptors during construction.

While Mitigation Measure NOI-MM-1
would reduce the effects to sensitive
receptors, this impact would still be
significant and unavoidable.

Construction of the approved project
would directly expose nearby
While the
approved project
prescribed
Mitigation
Measure NOI-MM1, the proposed
project has
modified this
measure for
Similar to the approved project, construction of the
proposed project would expose nearby sensitive
receptors. As the proposed project would be
located on the same site as the approved project,
implementation of the proposed project would
result in similar construction noise impacts as the
approved project. The proposed project has
modified Mitigation Measure NOI-MM-1 for
applicability with proposed project to reduce noise
impact. Although the proposed project would
New Mitigation
Measures:

Mitigation
Measures NOI1 through NOI-9
(refer to
Attachment A)
179
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 35 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
residential dwellings and sensitive land
uses to elevated noise levels and would
exceed both West Sacramento and
Sacramento daytime and nighttime
noise ordinance standards. As indicated
in the approved project traffic noise and
noise from haul trucks traveling on
public roads is predicted to exceed 60
day-night average noise level (Ldn).

Additionally, with the exception of
slurry wall construction, all noisegenerating construction work will occur during daytime hours between 7:00
a.m. and 10:00 p.m. Slurry wall
construction would occur at night.
(Please refer to Section 3.7.3.6 for more
detail.)
applicability with
proposed project.
involve additional construction activities to
construct the muti-use trail and associated
improvements, this additional construction is not
anticipated to result in noise impacts that could not
be reduced to less than significant with
implementation of Mitigation Measures NOI-1
through NOI-9.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with noise and the
exposure of sensitive receptors nor result in new
significant impacts. With adherence to Mitigation
Measures NOI-1 through NOI-9, there would be no
new or substantially more severe significant
impacts related to noise.

Significance Criterion NOI-2:

Exposure of Sensitive
Receptors to Temporary
Construction-Related
Vibration
Impact NOI-2: The approved project
identified that impacts related to
construction vibration would be
significant. While Mitigation Measure
NOI-MM-2 would reduce the impacts to
sensitive receptors, this measure would
not reduce vibration to below the
applicable levels. Therefore, impacts
would be significant and unavoidable.

Construction of the approved project
would exceed the Federal Transit
Administration (FTA) threshold of 0.2
inches per second (in/sec). While
construction of the approved project
would not typically operate within
approximately 30 feet of residences and
structures, some construction activities
While the
approved project
prescribed
Mitigation
Measure NOI-MM2, this mitigation
measure is not
applicable to the
proposed project.

Similar to the approved project, the proposed
project would include excavation and earth-moving
vehicles (i.e., excavators which would be similar to
large bulldozers). In addition, as the proposed
project would be located on the same site as the
approved project and the location of sensitive
rectors would be similar to the approved project.

Although the proposed project would involve
additional construction activities to construct a
paved multi-use trail with associated trail
improvements (e.g., site access, parking, rest stop
bulb-outs, signage and monuments), this additional
construction is not anticipated to result in noise
impacts that could not be reduced to less than
significant with implementation of Mitigation
Measures NOI-4 through NOI-8.

New Mitigation
Measures:

Mitigation
Measures NOI4 through NOI-8
(refer to
Attachment A)
180
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 36 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
would directly expose residences and
other structures to ground vibration in
excess of 0.2 in/sec. (Please refer to
Section 3.7.3.6 for more detail.)
As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated the exposure of
sensitive receptors to vibration nor result in new
significant impacts. With adherence to Mitigation
Measures NOI-4 through NOI-8, as identified in the
proposed project, there would be no new or
substantially more severe significant impacts
related to transportation.

Significance Criterion NOI-3:

Exposure of Sensitive
Receptors to Traffic Noise
from the Extension of
Village Parkway
Impact NOI-3: The approved project
identified that impacts to sensitive
receptors related to traffic noise would
be less than significant with mitigation
incorporated. The approved project
would include an extension of Village
Parkway, which was previously planned
under the Southport Framework Plan.

This extension would directly expose
land uses within approximately 100 feet
of the roadway to traffic noise that
exceeds 60 Ldn. Residences located
within this distance would be therefore
directly exposed to a significant noise
impact. Mitigation Measure M.M. 4-8.1
would reduce this effect to a less than
significant level. (Please refer to Section

3.7.3.6 for more detail.)
While the
approved project
prescribed
Mitigation
Measure MM.4-8-
1 from the
Southport
Framework Plan
draft EIR, this
mitigation measure
is not applicable to
the proposed
project.

While the proposed project would not include any
new road extensions, the proposed project would
involve additional construction activities and crew
commutes, including the transport of construction
equipment and materials to the proposed project
site.

Additionally, since the approved project has already
been constructed, the extension of Village Parkway
is already considered in the existing noise
environment of the proposed project.

As the proposed project would be located on the
same site as the approved project, implementation
of the proposed project would result in similar
construction traffic noise impacts as the approved
project. Therefore, implementation of Mitigation
Measures NOI-1 through NOI-9 as identified by the
proposed project would reduce any impacts to less
than significant.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with traffic noise nor
result in new significant impacts.

No applicable
mitigation
measures.
181
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 37 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Vegetations and Wetlands
Significance Criterion VEG1: Disturbance or Removal
of Riparian Habitat as a
Result of Project
Construction
Impact VEG-1: The approved project
identified that impacts related to
habitat disturbance or removal would
be significant. While, implementation
of Mitigation Measures VEG-MM-1,
VEG-MM-2, VEG-MM-3, and VEG-MM4 would reduce the level of permanent impacts, due to the length of time
required for newly planted trees to
reach a mature size, permanent impacts
to riparian habitat would remain
significant and unavoidable.

Construction of the approved project
would permanently remove a total of
approximately 17.31 acres of
cottonwood riparian woodland, 1.57
acres of valley oak riparian woodland,

2.56 acres of walnut riparian woodland,
and 9.15 acres of riparian scrub.

Additionally, the existing Sacramento
River levee would be mostly retained
with the exception of the five breach
locations. The riparian habitat between
the breaches would be removed where
grading and levee degradation are
necessary. In addition, riparian habitat
would be removed at the erosion repair
sites. (Please refer to Section 3.8.3.6 for
more detail.)
While the
approved project
prescribed
Mitigation
Measures VEGMM-1 through
VEG-MM-4, these
mitigation
measures are not
applicable to the
proposed project.

While the approved project would include
additional construction activities to construct a
paved multi-use tail and associated improvements,
the proposed project has been designed to fully
avoid impacts to riparian habitat, and no riparian
trees or woody vegetation would be impacted. All
within the work within the proposed project would
be limited to the top of the levee and the inland
side of the levee (e.g., for pedestrian access ramps)
outside of the existing riparian habitat. However,
project construction activities adjacent to the
riparian area have the potential to result in
inadvertent disturbance during construction.

Implementation of Mitigation Measure BIO-1
would reduce potential impacts to riparian habitat
to less than significant.

Therefore, implementation of Mitigation Measure
BIO-1, as identified in the approved project, would
ensure that impacts to riparian habitat are reduced
to a less than significant level. No new impacts or
increase in severity of impacts related to biological
resources would occur.

New Mitigation
Measures:

Mitigation
Measure BIO-1
(refer to
Attachment A)
182
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 38 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion VEG2: Loss of Waters of the
United States as a Result of
Project Construction
Impact VEG-2: The approved project
identified that construction impacts
related to the loss of waters of the
United States would be less than
significant with mitigation
incorporated. Implementation of the
approved project would result in
permanent fill of waters of the United
States, including a perennial drainage
and unvegetated agricultural and
roadside ditches. With implementation
of the ECs to develop a SWPPP (Chapter
2, Section 2.4.12,17 Stormwater
Pollution Prevention Plan) and
Mitigation Measures VEG-MM-2
through VEG-MM-5, impacts to
wetlands and other waters would be
reduced to a less than significant level.
(Please refer to Section 3.8.3.6 for more
detail.)
No seasonal wetlands or wetland vegetation or
other potentially regulated aquatic features aside
from the Sacramento River were observed along
the trail alignment. The proposed project would not
require direct removal, filling, hydrological
interruptions, or construction that would affect
State or federally protected wetlands or other
regulated waters. Therefore, the project would
have no impact.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated the loss of
jurisdictional water nor result in new significant
impacts.

No applicable
mitigation
measures.

Significance Criterion VEG3: Disturbance or Removal
of Protected Trees as a
Result of Project
Construction
Impact VEG-3: The proposed project
identified that the proposed project
would result in removal of protected
trees. As such the approved project
would result in less than significant
impacts with mitigation incorporated.

Implementation of the project would
result in the disturbance or removal of
numerous trees that may be considered
heritage trees under the City’s Tree
Preservation Ordinance and are also
considered riparian habitat. The
removal or harming of heritage trees as
a result of construction activities
While the
approved project
prescribed
Mitigation
Measures VEGMM-2 through
VEG-MM-4, and
VEG-MM-6, these
mitigation
measures are not
applicable to the
proposed project.

No tree removals would occur as part of the
proposed project. As such, the project would not
conflict with the City’s Tree Preservation Ordinance.

The project would not conflict with any local
policies or ordinances protecting biological
resources.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated the tree removal nor
result in new significant impacts.

No applicable
mitigation
measures.
183
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 39 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
associated with the proposed project
would conflict with the City’s tree
ordinance, and therefore
implementation of Mitigation
Measures VEG-MM-2, VEG-MM-3,
VEG-MM-4, and VEG- MM-6 would be
required to reduce impacts to heritage
trees to less than significant levels.
(Please refer to Section 3.8.3.6 for more
detail.)
Significance Criterion VEG4: Potential Loss of SpecialStatus Plant Populations Caused by Habitat Loss
Resulting from Project
Construction
Impact VEG-4: The approved project
identified that impacts to special-status
plant species from project construction
would be less than significant with
mitigation incorporated.

Biological surveys and field assessments
were conducted at the approved
project site on April 29, May 3, May 5
(to check a raptor nest), May 13, and
May 31, 2011, and March 25–27, 2013
(Swainson’s hawk 29 nesting surveys).

Another potential borrow site was
surveyed on January 4, 2013.

Additionally, elderberry shrub surveys
were conducted during reconnaissancelevel surveys described above. Protocollevel surveys were conducted for a number of shrubs on November 27 and
29, 2012; January 4, 16, and 17, 2013;
July 25, 2013; September 24, 2013; and
October 7, 2013.

Based on the United States Fish and
Wildlife Service (USFWS) (2013) list for
the West Sacramento quadrangle, a
While the
approved project
prescribed
Mitigation
Measures VEGMM-2 through
VEG-MM-4, and
VEG-MM-7 and
MM-VEG-8, these
mitigation
measures are not
applicable to the
proposed project.

The revised project would be located within the
same area as the approved project; however, the
proposed project would be located on top of the
approved project which has already been disturbed.

While the proposed project would include
additional construction activities to construct a 5.9-
mile multi-use trail and associated improvements,
these impacts would not be more severe than the
approved project.

A field survey for the proposed project was
conducted on the project site on March 16, 2023.

The survey identified vegetation and land cover
types in the Biological Study Area (BSA) consisting
of Quercus lobata Riparian Forest & Woodland
Alliance, ruderal grassland, and developed lands.

The BSA for the proposed project consists of 97.24
acres and approximately 5.9 linear miles, located in
the southern portion of West Sacramento along the
existing Southport Setback (the approved project).

The BSA southern terminus is located at South River
Road at the city limits of West Sacramento, and the
northern terminus is located at the South River
Road and Locks Drive intersection. East of the BSA
is the Sacramento River and associated riparian
No applicable
mitigation
measures.
184
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 40 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
review of California Natural Diversity
Database (CNDDB) (2013) occurrences
within a 10-mile radius of the project
area and personal observations
included 28 special-status wildlife
species that were identified as having
potential to occur in the project area
and surrounding region. Of these, 14
were excluded from consideration,
either because the project area is
outside the species’ known range or
suitable habitat is minimal to absent.

The remaining 14 could occur in the
project area.

While the approved project did not
identify occurrences of special-status
plants in the project area, blooming
period surveys of the project area were
not conducted for special-status plant
species. Because the presence and
extent of any special-status plants in the
project construction area are unknown,
implementation of the project could
result in their removal during
construction. Implementation of
Mitigation Measures VEG-MM-2, VEGMM-3, VEG-MM-4, VEG-MM-7, and VEG-MM-8 would reduce this impact to
a less than significant level. (Please
refer to Section 3.8.3.6 for more detail.)
corridor. Existing development is also present to
the east of the central portion of the BSA, including
the Sacramento Yacht Club and Sherwood Harbor
Marina and RV Park. West of the BSA is a mix of
residential developments and agricultural farmland.

The CNDDB and USFWS record searches, from
September 27, 2024, for the proposed project
(refer to Attachment C) listed 27 special-status
plant species, 51 special-status wildlife species, and
4 special-status plant communities as occurring
within the surrounding United States Geological
Survey 7.5-minute quadrangles (Sacramento West,
Taylor Monument, Rio Linda, Sacramento East,
Grays Bend, Davis, Saxon, Clarksburg, and Florin).

However, all but two species were eliminated from
consideration based on the results of the database
searches, and conditions observed during the field
survey (e.g., no elderberry shrubs, host plant of the
federally threatened valley elderberry longhorn
beetle (Desmocerus californicus dimorphus), or
other special-status species suitable habitats were
identified).

Additionally, as the proposed project does not
provide suitable habitat for special-status plant, no
habitat for special-status plant species would occur.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with special status
plants nor result in new significant impacts.
significant impacts to energy resources.
185
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 41 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion VEG6: Conflict with Provisions of an Adopted HCP/NCCP or
Other Approved Local,
Regional, or State Habitat
Conservation Plan
Impact VEG-6: The approved project
identified less than significant impacts
to conflicts with the provisions of an
adopted Habitat Conservation Plan/
Natural Community Conservation Plan
(HCP/NCCP).

The approved project would be within
the Yolo County HCP/NCCP. Under this
project, the Administrative Draft Yolo
HCP/NCCP is expected to be completed
by June 2013. Although there is no
adopted HCP/NCCP at this time, the
advisory recommendations from the
Yolo County Habitat/Natural
Community Conservation Plan Joint
Powers Agency (JPA) include:
• No further loss of wetlands and oak
woodlands.
• Restoration, enhancement, and
maintenance of healthy riparian
corridors and wide areas of riparian
habitat.
• Increased areas of naturally
inundated floodplain.
• Maintenance and enhancement of
natural habitats within agricultural.

The approved project would not conflict
with this plan because it promotes
conservation of the county’s existing
oak woodlands. (Please refer to Section

3.8.3.6 for more detail.)
No mitigation
required.

The Yolo HCP/NCCP was approved by the Yolo
County Board of Supervisors and the cities of Davis,
West Sacramento, Winters, and Woodland in June
2018 and was formally implemented in January
2019.

The proposed project would be implemented in
accordance with the HCP/NCCP avoidance and
minimization measures. Through payment of
HCP/NCCP fees or equivalent mitigation, the project
would contribute to the HCP/NCCP’s conservation
strategy, thereby benefiting the above-listed
covered species. With incorporation of HCP/NCCP
fees or equivalent mitigation and adherence to
other HCP/NCCP avoidance and minimization
measures, the project’s individual impacts and its
contribution to cumulative impacts to covered
species would be less than significant.

The proposed project would not substantially
increase the severity of the previously identified
impacts associated with conflicts to the provision of
an HCP/NCCP nor result in new significant impacts.

No mitigation
required.
186
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 42 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Fish and Aquatic Resources
Significance Criterion FISH1: Temporary Disturbance of Fish and Degradation of
Habitat during Construction
Activities
Impact FISH-1: The approved project
identified less than significant impacts
with mitigation incorporated associated
with the temporary disturbance of fish
and degradation of habitat.

Ground-disturbing activities during
construction of the approved project
would increase the potential for erosion
and discharge of fine sediment into the
Sacramento River, potentially affecting
sensitive fish and aquatic habitat.

Therefore, in-water construction
activities during this period could have
significant adverse effects on specialstatus species. However, with implementation of the SWPPP to
control erosion and sedimentation,
turbidity monitoring in adjacent water
bodies and Mitigation Measure FISHMM-1, these effects would be reduced to a less than significant level. (Please
refer to Section 3.9.3.6 for more detail.)
While the
approved project
prescribed
Mitigation
Measure Fish-MM1, this mitigation
measure is not
applicable to the
proposed project.

Although the proposed project would result in
additional construction of trail improvements, only
minor grading would be required for site
preparation and ground disturbance associated
with paving the trail, parking and associated ramps.

The proposed project has been designed to fully
avoid impacts to riparian habitat, and no riparian
trees or woody vegetation would be impacted. All
work would be limited to the top of the levee and
the inland side of the levee (e.g., for pedestrian
access ramps), outside of the existing riparian
habitat.

Further, as discussed in Impact WQ-2, the proposed
project would be required to comply with RCM
HYD-1 and RCM HYD-2, which would require the
preparation of a SWPPP and implementation of an
Erosion and Sediment Control Plan, similar to the
approved project. Additionally, project construction
activities adjacent to the riparian area have the
potential to result in inadvertent disturbance during
construction. Implementation of Mitigation
Measure BIO-1 would reduce potential impacts to
riparian habitat to less than significant.

As such the revised project would not substantially
increase the severity of the previously identified
disturbance impacts nor result in new significant
impacts. With adherence to applicable regulatory
requirements, there would be no new or
substantially more severe significant impacts
related to GHG emissions
New Mitigation
Measures:

Mitigation
Measure BIO-1
(refer to
Attachment A)
187
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 43 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Wildlife
Significance Criterion WILD1: Disturbance or Loss of
VELBs and Their Habitat
(Elderberry Shrub)
Impact WILD-1: The approved project
identified less than significant impacts
with mitigation incorporated
associated with the loss of the Valley
Elderberry Longhorn Beetle (VELB).

Construction of the approved project
would result in the loss of VELB. Up to
19 elderberry shrubs would be removed
or transplanted, and up to 26 elderberry
shrubs would be affected.

Implementation of Mitigation
Measures VEG-MM-3, WILD-MM-1
through WILD-MM-3, and WILD-MM-3
would reduce potential effects on VELBs
to a less than significant level.

While the
approved project
prescribed
Mitigation
Measures VEGMM-3 and WILDMM-1 through
WILD-MM-3, these
mitigation
measures are not
applicable to the
proposed project.

The proposed project would be located on top of
the approved project site and would include
construction of a multi-use trail and associated
improvements. As stated in Impact VEG-4, the
proposed project did not observe elderberry shrubs
(host plant of the federally threatened valley
elderberry longhorn beetle [Desmocerus
californicus dimorphus]), or other special-status
species suitable habitats during the filed survey.

The proposed project would have no impact to the
valley elderberry longhorn beetle.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts on the valley elderberry longhorn
beetle nor result in new significant impacts.

Therefore, there would be no new or substantially
more severe significant impacts.

No applicable
mitigation
measures.

Significance Criterion WILD2: Disturbance or Loss of
Western Pond Turtles and
Their Habitat
Impact WILD-2: The approved project
identified that impacts to western pond
turtles would be less than significant
with mitigation incorporated.

Open water areas in the approved
project area include the Sacramento,
Main Drain and agricultural ditches, and
Bees Lake. The open water provides
breeding, foraging, and migration
habitat for numerous wildlife species,
including habitat for the western pond
turtle (Actinemys marmorata) and giant
garter snake.

Implementation of the approved project
would cause temporary disturbance to
While the
approved project
prescribed
Mitigation
Measures VEGMM-3 and WILDMM-5 through
WILD-MM-7, these
mitigation
measures are not
applicable to the
proposed project.

As the proposed project would be primarily located
on top of the previously constructed setback levee,
there would be no suitable habitat for the western
pond turtle. Additionally, the field survey for the
proposed project did not identify suitable habitat
for the western pond turtle within the proposed
project BSA. There would be no impact.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts on western pond turtles nor
result in new significant impacts. Therefore, there
would be no new or substantially more severe
significant impacts.

No applicable
mitigation
measures.
188
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 44 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
upland nesting or cover habitat and
would lead to the potential for loss of
individual pond turtles. Additionally,
western pond turtles could be crushed
and killed during construction.

Additionally, western pond turtles and
nests containing hatchlings or eggs
could also be crushed and killed during
the movement of construction
equipment in annual grasslands within
1,200 feet of suitable aquatic habitat.

Implementation of Mitigation
Measures VEG-- MM-3 and WILD-MM4 would avoid, minimize, and/or compensate for impacts to western
pond turtles, and reduce this impact to
a less than significant level. (Please
refer to Section 3.10.3.6 for more
detail.)
Significance Criterion WILD3: Disturbance or Loss of
Giant Garter Snakes and
Their Habitat
Impact WILD-3: The approved project
identified that impacts associated with
the loss of giant garter snake habitat
would be less than significant with
mitigation incorporated.

Implementation of the approved project
would result in the loss of giant garter
snakes and suitable habitat. This habitat
includes agricultural ditches with
summer water, emergent wetlands,
cottonwood riparian woodland, and
Bees Lake, along with adjacent annual
grasslands and agricultural fields that
provide basking and overwintering sites.

Additionally, the project would
While the
approved project
prescribed
Mitigation
Measures VEGMM-3 and WILDMM-5 through
WILD-MM-7, these
mitigation
measures are not
applicable to the
proposed project.

While the CNDDB and USFWS record searches list
the giant garter snake as occurring within the
surrounding United States Geological Survey 7.5-
minute quadrangles, no suitable habitats were
observed on the proposed project site. Although
the proposed project would be located on top of
the approved project site, the setback levee has
already been constructed and there would be no
suitable habitat within the proposed project
alignment.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts on western pond turtles nor
result in new significant impacts. Therefore, there
No applicable
mitigation
measures.
189
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 45 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
permanently remove approximately

2.24 acres of suitable upland habitat
around Bees Lake. However, the
approved project would not result in
temporary impacts on giant garter
snake habitat within the construction
footprint. The total area of suitable
upland habitat affected during
construction of the approved project
would be minimal. Implementation of
Mitigation Measures VEG-MM-3,
WILD-MM-5, WILD-MM-6, and WILDMM-7 would reduce potential impacts on giant garter snakes to a less than
significant level. (Please refer to Section

3.10.3.6 for more detail.)
would be no new or substantially more severe
significant impacts.

Significance Criterion WILD4: Loss of Swainson’s Hawk
Foraging and Nesting
Habitat
Impact WILD-4: The approved project
identified that impacts associated with
the loss of foraging habitat for
Swainson’s hawk (Buteo swainsoni)
would be less than significant with
mitigation incorporated.

As described in Impact VEG 4, multiple
field surveys were conducted for the
approved project, and the surveys
identified suitable foraging habitat for
Swainson’s hawk.

The approved project would result in
the loss of Swainson’s hawk foraging
habitat associated with the conversion
of open space. Implementation of the
approved project would result in the
permanent loss of 173 acres of suitable
Swainson’s hawk foraging habitat and
While the
approved project
prescribed
Mitigation
Measures VEGMM-1, VEG-MM-3
WILD-MM-8
through WILDMM-9, these
mitigation
measures are not
applicable to the
proposed project.

Similar to the approved project, the proposed
project provides suitable foraging habitat (ruderal
grassland) and multiple suitable nest trees for
Swainson’s hawk. While no Swainson’s hawk
nesting activity or stick nests were observed during
LSA’s survey, there is a presumed extant (May 5,
2016) CNDDB occurrence for this species located
approximately 740 feet from the BSA near Village
Parkway. Although the proposed project would be
limited to the top and inland side of the levee, and
no tree removal would occur, the species could
establish nests in the trees that are present in the
adjacent riparian vegetation associated with the
Sacramento River.

Construction-related disturbance (e.g., noise,
vehicle traffic, etc.) conducted during the nesting
season for Swainson’s hawk (March 1 to September
15) could directly impact this species by causing
New Mitigation
Measures:

Mitigation
Measure BIO-2
(refer to
Attachment A)
190
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 46 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
the temporary loss (restored within 1
year) of 173 acres of suitable foraging
habitat. In addition, the approved
project would result in permanent
effects on 38 acres of known and
potential Swainson’s hawk nesting
habitat.

Because the approved project would
result in the permanent loss of foraging
and nesting habitat, implementation of
Mitigation Measures VEG-MM-1 and
VEG-MM-3 and WILD-MM-8 through
WILD-MM-9 would be required to
avoid, minimize, and/or compensate for
direct effects on Swainson’s hawks’
foraging and nesting habitat. With
implementation of these measures,
impacts would be reduced to a less
than significant level. (Please refer to
Section 3.10.3.6 for more detail.)
adults to abandon nests in nearby trees, resulting in
nest failure and reduced reproductive potential.

The proposed project development would remove
Swainson's hawk foraging habitat.

As a participant of the Yolo HCP/NCCP, the City will
be required to pay a land cover fee to compensate
for the loss of Swainson’s hawk foraging habitat.

Implementation of Mitigation Measure BIO-2, as
identified in the proposed project, would reduce
potential direct impacts to Swainson’s hawks.

Significance Criterion WILD5: Disturbance or Loss of
Western Burrowing Owls
and Their Habitat
Impact WILD-5: The approved project
identified that impacts associated with
the loss of foraging habitat for western
burrowing owl (Athene cunicularia)
would be less than significant with
mitigation incorporated.

As described in Impact VEG 4, multiple
field surveys were conducted for the
approved project, and the surveys
identified suitable foraging habitat for
western burrowing owl.

Implementation of the approved project
would result in the permanent loss of
While the
approved project
prescribed
Mitigation
Measures VEGMM-3 and WILDMM-10 through
WILD-MM-11,
these mitigation
measures are not
applicable to the
proposed project.

Similar to the approved project, suitable denning
and foraging habitat are present in the ruderal
grassland areas within the proposed project.

Additional numerous California ground squirrel
(Otospermophilus beecheyi) burrows were observed
in the BSA during the March 16, 2023, site survey.

However, no sign of burrowing owl was observed.

The nearest CNDDB occurrence for western
burrowing owl is approximately 1.5 miles east of
the BSA, near the Sacramento Executive Airport.

Similar to the approved project, construction of the
proposed project would result in the loss of suitable
foraging habitat for this species. As a participant of
the Yolo HCP/NCCP, the City will be required to pay
New Mitigation
Measures:

Mitigation
Measure BIO-3
(refer to
Attachment A)
191
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 47 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
173 acres of potential burrowing owl
nesting and foraging habitat within the
project area, the temporary loss of 163
acres of potential burrowing owl
nesting and foraging habitat from
construction, and up to 1,603 acres of
potential habitat from borrow sites.

Because the approved project would
result in the permanent loss of foraging
and nesting habitat, implementation of
Mitigation Measures VEG-MM-3 and
WILD-MM-10 through WILD-MM-11
would be required to avoid and/or
minimize direct impacts to burrowing
owls to a less than significant level.
(Please refer to Section 3.10.3.6 for
more detail.)
a land cover fee to compensate for the loss of
burrowing owl foraging habitat. Implementation of
Mitigation Measure BIO-3, as identified in the
proposed project, would reduce potential direct
impacts to western burrowing owls.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts on burrowing owls nor result in
new significant impacts. Therefore, there would be
no new or substantially more severe significant
impacts.

Significance Criterion WILD6: Loss or Disturbance of
Tree-, Shrub-, and GroundNesting Special-Status and
Non-Special-Status
Migratory Birds and Raptors
Impact WILD-6: The approved project
identified that impacts associated with
special-status birds and migratory birds
and raptors would be less than
significant with mitigation
incorporated.

Construction of the approved project
could result in the removal or
disturbance (e.g., trimming) of trees and
shrubs that provide potential nesting
habitat for special-status birds and
raptors, including Swainson’s hawk,
loggerhead shrike, and white-tailed kite.

Additionally, trees and shrubs in the
project area may support nesting for
various common migratory birds and
While the
approved project
prescribed
Mitigation
Measures VEGMM-1, VEG-MM-3,
and MM-WILD-8,
these mitigation
measures are not
applicable to the
proposed project.

The proposed project alignment would consist of a
trail that would be situated atop of the approved
project. Similar to the approved project, the
proposed project would be bordered by developed
areas to the west; however, the project would be
located along the Sacramento River and its
associated riparian habitat, which provide a wildlife
movement corridor for aquatic and terrestrial
wildlife species.

However, as the proposed trail would be located on
the graveled top of the existing levee, it has been
designed to avoid impacts to natural areas,
including adjacent riparian areas associated with
the Sacramento River.

Similar to the approved project, construction of the
proposed project could temporarily interfere with
New Mitigation
Measures:

Mitigation
Measures BIO-2
and BIO-3 (refer
to Attachment
A)
192
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 48 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
raptors, such as western bluebird,
western kingbird, Anna’s hummingbird,
lesser goldfinch, American goldfinch,
red-shouldered hawk, and red-tailed
hawk. During the 2011 field surveys, an
active red-tailed hawk nest, a black
phoebe nest, and swallow nests were
observed, although none were located
within the project area.

Fallow agricultural fields and nonnative
annual grasslands also provide potential
nesting habitat for ground-nesting
birds, including northern harrier (a State
Species of Special Concern) and nonspecial-status species like mallards, redwinged blackbirds, and ring-necked pheasants. If construction occurs during
the breeding season (generally from
February 1 to August 31), activities such
as tree and shrub removal, excavation,
and grading in the project area could
disturb or remove occupied nests of the
species.

As such, implementation of Mitigation
Measures VEG-MM-1, VEG-MM-3, and
WILD-MM-8 would avoid and minimize
impacts to a less than significant level.
(Please refer to Section 3.10.3.6 for
more detail.)
localized wildlife movement through the biological
survey area. However, the trail itself would not
create a barrier to wildlife movement and, once
operational, would allow for continued passage by
wildlife. Additionally, construction of the proposed
project has the potential to affect two specialstatus species: the western burrowing owl and Swainson’s hawk, as well as the following nonspecial-status migratory birds and raptors observed during the field survey: red-tailed hawk (Buteo
jamaicensis), turkey vulture (Cathartes aura), wild
turkey (Meleagris gallopavo), tree swallow
(Tachycineta bicolor), western meadowlark
(Sturnella neglecta), mourning dove (Zenaida
macroura), mallard (Anas platyrhynchos), killdeer
(Charadrius vociferus), great egret (Ardea alba), and
snowy egret (Egretta thula).

While no significant native wildlife nursery sites,
such as large bat roosts and heron rookeries, would
be impacted by the proposed project, potential
impacts to bird nests would be avoided or mitigated
in accordance with Mitigation Measures BIO-2 and
BIO-3, respectively. Additionally, Mitigation
Measure Wild-MM-8, as identified in the approved
project, would reduce impacts to non-special-status
migratory birds and raptors. Therefore, with
implementation of these mitigation measures,
potential impacts to native resident or migratory
wildlife corridors and wildlife nursery sites would be
reduced to a less than significant level.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with migratory birds
and raptors and nesting special-status species nor
193
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 49 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
result in new significant impacts. Therefore, there
would be no new or substantially more severe
significant impacts.

Significance Criterion WILD7: Loss or Disturbance of
Bats and Bat Roosts
Impact WILD-7: The approved project
identified less than significant impacts
with mitigation incorporated
associated with the disturbance of bats
and bat roosts.

Construction activities associated with
the approved project, such as tree
removal, trimming, and construction
noise, could result in direct effects on
roosting bats, including the destruction
of active roosts, loss of individuals, or
roost failure. Additionally, nighttime
construction activities could disturb
bats emerging from nearby roosts,
directly disrupting their foraging
activities. These construction impacts
could lead to a subsequent population
decline and affect the viability of local
bat populations.

Implementation of Mitigation
Measures VEG-MM-1, VEG-MM-3, and
WILD-MM-12 would reduce this direct
impact to a less than significant level.
(Please refer to Section 3.10.3.6 for
more detail.)
While the
approved project
prescribed
Mitigation
Measures VEGMM-1, VEG-MM-3,
and WILD-MM-12,
these mitigation
measures are not
applicable to the
proposed project.

Although the proposed project alignment would
consist of a multi-use trail that would be situated
atop of the approved project, no significant native
wildlife nursery sites, such as large bat roots would
be impacted by the proposed project. Additionally,
the field survey conducted for the proposed project
did not observe suitable bat habits.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with the loss or
disturbance of bats and bat roosts. Therefore, there
would be no new or substantially more severe
significant impacts.

No applicable
mitigation
measures.

Significance Criterion WILD9: Disruption of Wildlife
Movement Corridors
Impact WILD-9: The approved project
identified that implementation of the
approved project would have less than
significant impacts to wildlife corridors.

No mitigation
required.

Although the proposed project alignment consists
of a trail that would be situated atop of the
approved project, and bordered by developed areas
to the west, the project would be located along the
Sacramento River and its associated riparian
habitat, similar to the approved project, which
No mitigation
required.
194
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 50 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
The approved project includes riparian
woodland habitats adjacent to the
Sacramento River, which are considered
a major wildlife movement corridor.

While construction of the approved
project may temporarily impede wildlife
movements due to fencing installed to
protect resources outside the
construction footprint, movement
would be restored to pre-project
conditions following construction.

Therefore, the disruption of movement
through the project area is considered a
less than significant direct and indirect
effect. (Please refer to Section 3.10.3.6
for more detail.)
would provide a wildlife movement corridor for
aquatic and terrestrial wildlife species. However, as
the proposed trail would be located on the graveled
top of the existing levee, it has been designed to
avoid impacts to natural areas, including adjacent
riparian areas associated with the Sacramento
River. Similar to the approved project, construction
of the proposed project could temporarily interfere
with localized wildlife movement through the BSA.

However, the trail itself would not result in a barrier to wildlife movement and, once operational, would
allow for continued passage by wildlife.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with wildlife corridors
nor result in new significant impacts. Therefore,
there would be no new or substantially more
severe significant impacts.

Significance Criterion WILD10: Conflict with Provisions of an Adopted HCP/NCCP or
Other Approved Local,
Regional, or State Habitat
Conservation Plan
Impact WILD-10: Please refer to Impact
VEG-6.

No mitigation
required.

Please refer to Impact VEG-6. No mitigation
required.

Land Use and Agriculture
Significance Criterion LU-1.

Temporary Changes in Land
Uses to Accommodate
Staging, Haul Routes, and
Stockpiling of Soil Materials
Impact LU-1: The approved project
identified less than significant impacts
to temporary changes in land uses
associated with staging, haul routes,
and stockpiling of soil materials.

The approved project site is largely
undeveloped but adjoins residential
uses at its northern end. Although much
of the land is vacant, the Southport
No mitigation
required.

The proposed project would construct
approximately 5.9 miles of new non-motorized
multi-use recreational trail on top of the existing
levee alignment of the approved project. According
to the updated City of West Sacramento General
Plan, the majority of the proposed project area is
designated as Open Space (OS); however, the
northernmost portion of the project would be
designated as Riverfront Mixed Use (RMU).

No mitigation
required.
195
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 51 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Framework Plan has designated the
lands within the project site as open
space, various densities of residential,
mixed use, commercial, community and
neighborhood parks, and agriculturecluster6,7. Additionally, the City of West Sacramento has designated the
approved proposed project areas as
Low Density Residential, Agriculture,
Recreation and Parks, Medium Density
Residential, Open Space, Rural
Residential, High Density Residential,
River Mixed Use, Public/Quasi Public,
Neighborhood Commercial, Water
Related Commercial, and Rural Estates.

Implementation of the approved project
would involve levee construction
requiring three staging areas for offices,
soil stockpiling, and equipment parking.

These three staging areas would occupy
approximately 3.4, 61.7, and 17.5 acres,
respectively. The lands used for staging
and stockpiling would be agricultural,
vacant, or undeveloped and would be
returned to their original use after
construction. Any agricultural lands
designated for long-term temporary
staging would resume agricultural
production post-construction.

Therefore, this impact would be less
Although the proposed project would involve the
construction of a multi-use trail on top of the
approved project’s levee alignment and associated
improvements, it would not require the use of
staging areas. Under the proposed project, no land
uses would be changed.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with land use changes
nor would it result in new significant impacts.

Therefore, there would be no new or substantially
more severe significant impacts.
6 City of West Sacramento. 2010. City of West Sacramento Zoning Map. 7 Yolo County. 2009. County of Yolo 2030 Countywide General Plan. 196
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 52 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
than significant. (Please refer to Section

3.11.3.6 for more detail.)
Significance Criterion LU-2:

Change in Land Use
Designations or Potential to
Conflict with Local Land Use
Designations as a Result of
Construction.

Impact LU-2: The approved project
identified that the impacts associated
with changes to land uses and conflicts
with land use designations would be
significant. As the project's footprint is
necessary to implement effective flood
risk-reduction measures, these impacts
cannot be mitigated. Therefore, this
impact would be significant and
unavoidable.

Implementation of the proposed project
could require WSAFCA to acquire a
permanent right-of-way adjacent to the
levee through fee title or easement to
prevent residential or utility
encroachments and accommodate an
expanded levee footprint. This
expansion, including the setback levee
at Bees Lake, would conflict with
existing land use designations for park,
residential, and mixed-use under the
Southport Framework Plan. Although
the existing levee is designated as open
space, and the project aligns with the
agriculture-cluster designation allowing
public uses, the new levee and
associated lands may need to be
designated as either open space or
public/quasi-public if the City amends
the plan.

Additionally, the approved project could
also reduce the capacity of the
No feasible
mitigation
measures.

The proposed project would construct
approximately 5.9 miles of new non-motorized
multi-use recreational trail on top of the existing
levee alignment of the approved project. While the
proposed project would be implemented in the
same vicinity as the approved project, the approved
project was certified in 2014. Since the approval of
the approved project, many of the applicable
policies and regulations have been updated. As
such, the applicable planning policies and
regulations for the proposed project include the
City of West Sacramento General Plan; the City of
West Sacramento Municipal Code; the City of West
Sacramento Bicycle, Pedestrian, and Trails Master
Plan; and the City of West Sacramento Parks,
Recreation, and Open Space Master Plan.

City of West Sacramento General Plan. The City of
West Sacramento General Plan Land Use Map
designates the project site as Open Space (OS). This
designation provides for natural open space areas
where public ownership, easements, or other
entitlements provide a public purpose. The City has
set aside open space areas along the Sacramento
River and Port of Sacramento Deep Water Ship
Channel to preserve open areas near these water
ways. The proposed project would develop a 5.9-
mile-long multi-use trail for public use. Therefore,
the proposed project would be consistent with the
City of West Sacramento General Plan land use
designation for the project site.

City of West Sacramento Municipal Code. The City
of West Sacramento Zoning Map identifies the
No mitigation
required.
197
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 53 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Northeast and Southeast Villages for
future development, resulting in a
significant impact. (Please refer to
Section 3.11.3.6 for more detail.)
project site as Public Open Space (POS). The POS
Zone is intended to preserve lands for such
purposes such as open space, habitat protection,
drainage/ flood control, mitigation, and passive
recreation. This zone provides for natural open
space areas where public ownership, easements, or
other entitlement provide a public purpose.

Therefore, the proposed multi-use trail would be
consistent with the City of West Sacramento Zoning
Ordinance.

City of West Sacramento Bicycle, Pedestrian, and
Trails Master Plan. The purpose of the Bicycle,
Pedestrian, and Trails Master Plan (BPTMP) is to lay
out a renewed vision of connected bikeways,
walkways, and trails that link together
neighborhoods, places of employment, shopping
centers, parks, and schools. The proposed project is
identified as a Signature Project within the BPTMP,
which is defined as a project that received high
ranks in one or more prioritization criteria and
would offer solutions to mobility barriers within the
City. Therefore, the proposed multi-use trail would
directly support the City of West Sacramento
BPTMP.

City of West Sacramento Parks, Recreation and
Open Space Master Plan. The purpose of the City of
West Sacramento Parks, Recreation and Open
Space Master Plan (PROSMP) is to provide a
roadmap for future development of recreational
facilities and opportunities for the City over the
next 10 years, consistent with the General Plan
2035 requirements. The PROSMP focuses on
identifying the City’s current and future recreation
needs to aid City staff and decision-makers in
198
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 54 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
providing and expanding and equitable distribution
of recreational facilities and opportunities to West
Sacramento residents and stakeholders. The
PROSMP has identified trails/ recreation corridors
such as the project area, which are designated open
space along the Sacramento River to connect
people and places while serving as active
transportation facilities. Therefore, the proposed
multi-use trail would directly support the PROSMP.

Generally, the proposed project would directly
support applicable plans and policies. These plans
contain goals and policies, which support a multimodal transportation system to encourage walking and bicycling as an alternative to automobile use.

Additional relevant policies relate to the protection
of natural resources, water quality, and provision of
public services. As such, the proposed project
would be consistent with all the relevant
regulations and policies contained in the approved
project. Therefore, implementation of the proposed
project would result in less than significant
impacts.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with land use changes
or land use conflicts nor would it result in new
significant impacts. Therefore, there would be no
new or substantially more severe significant
impacts.
199
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 55 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion LU-3:

Loss of Important Farmland
and Agricultural Production
Value
Impact LU-3: The approved project
identified significant effects to the loss
of important farmland. While GEO-MM1, LU-MM-1, and LU-MM-2 would reduce the intensity of effect, these
effects would still be significant and
unavoidable. (Please refer to Section

3.11.3.6 for more detail.)
The approved project identified several
areas designated as important
farmland, all located in the Southport
area of the City. The project area
encompasses approximately 500 acres
of prime farmland, primarily located
west of Bees Lake along the Sacramento
River, near Jefferson Boulevard north of
the South Cross Levee, and in
unincorporated areas at the southern
end of the project. Additionally, there is
less than 1 acre of unique farmland
located along the southern border near
the South Cross Levee and about 12
acres of farmland of statewide
importance in the unincorporated
region. The project also contains 611
acres of farmland classified as local
importance and 848 acres of farmland
with local potential.

While the
approved project
prescribed
Mitigation
Measures GEOMM-1, LU-MM-1,
and LU-MM-2,
these measures
are not applicable
to the proposed
project.

Although the proposed project is located in the
same location of the approved project, the
proposed project would be along the existing levee
alignment of the approved project. As such, the
majority of the proposed trail alignment is located
within land classified as “Other Land” with a small
portion designated as “Urban and Built-Up Land” by
the California Department of Conservation
Farmland Mapping and Monitoring Program
(FMMP).
8 Additionally, the California Department
of Conservation maps the project site as “Urban
and Built-Up Land” and “Other Land.” No portion of
the proposed trail would cross a parcel under a
Williamson Act contract. The trail alignment is
proposed on lands zoned for a variety of uses,
including residential and commercial uses, planned
development, civic space, and open space.

However, none of these areas is zoned for
agricultural use. Therefore, the proposed project
would not result in the conversion of Prime
Farmland, Unique Farmland, or Farmland of
Statewide Importance to a non-agricultural use, and
there would be no impact.

As such, the revised project would not substantially
increase the severity of the previously identified
impacts on agriculture and forestry resources nor
result in new significant impacts.

No applicable
mitigation
measures.
8 California Department of Conservation (DOC). 2016. Division of Land Resource Protection. California Important Farmland Finder (map). Website:
maps.conservation.ca.gov/dlrp/ciff (accessed January 21, 2021). 200
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail \PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 56
The construction of the approved
project would involve several staging
areas and temporary-access haul roads
developed on agricultural lands within
the project area. During construction,
land classified as important farmland in
these staging areas and haul roads may
be temporarily taken out of production
to facilitate preconstruction and
construction activities. However, these
areas would be restored to their pre-
project conditions, allowing agricultural
uses to resume once construction is
completed. Construction of the
approved project would lead to a
permanent loss of approximately 34
acres of prime farmland within the
construction footprint. Additionally, up
to 476 acres of prime farmland and 12
acres of farmland of statewide
importance in potential borrow areas
could be temporarily affected.

Furthermore, construction of the
approved project would result in a loss
of about $63,000 in agricultural
production value due to the permanent
conversion of agricultural lands in the
construction area, particularly between
the proposed setback levee and the
Sacramento River. While the
implementation of Mitigation
Measures GEO-MM-1, LU-MM-1, and
LU-MM-2 would aim to offset and
mitigate the conversion of prime
farmland, these measures do not
reduce the project's overall effects to a
less than significant level. Therefore,
this impact would be significant and
unavoidable. (Please refer to Section

3.11.3.6 for more detail.)
201
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 57 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Visual Resources
Significance Criterion VIS-1.

Result in Temporary Visual
Effects from Construction
Impact VIS-1: The approved project
identified significant impacts to visual
resources associated with construction
of the approved project. While
implementation of Mitigation
Measures VIS-MM-1 through VIS-MM3 would reduce the severity of these visual impacts, these impacts would not
be reduced to a less than significant
level, and effects would remain
significant and unavoidable.

Construction of the approved project
would require staging areas, require
substantial grading, has the potential to
create dust clouds, and would introduce
considerable heavy equipment and
associated vehicles into foreground
views from the rural residences and
South River, Davis, and Linden Roads;
the southern half of Village Parkway;
and the eastern end of Lake
Washington Boulevard. Dust control
would be implemented during
construction to reduce the potential for
slowly moving dust clouds that would
attract attention from visual receptors
and reduce the availability of shortrange views. Mitigation Measure VISMM-1 would help mitigate the direct effect of new earthen surfaces for all
viewers by improving seasonal interest,
but effects still would be adverse, and
Mitigation Measure VIS-MM-2 would
While the
approved project
prescribed
Mitigation
Measure VIS-1
through Mitigation
Measure VIS-3,
these measures
would not be
applicable to the
proposed project.

As the proposed project would be located atop the
approved project’s levee alignment, the proposed
project would not require staging areas. However,
similar to the approved project, the proposed
project has the potential to create dust clouds and
would introduce construction equipment and
vehicles into viewshed. Additionally, the proposed
project would include the proposed trail (unpaved
and paved), wayfinding signage, seating, and other
trail infrastructure. Trail design would not include
tall structures or landscaping that might obscure
views of the surrounding Sacramento Skyline or
views of the Vaca Mountains from levee trail
locations. The proposed trail would be designed to
follow the existing topography in order to minimize
grading, to the extent feasible. Additionally, the
proposed trail would increase public access to
currently inaccessible levee areas, affording trail
users scenic views from the proposed trail
alignment. Due to the relatively small scale of the
proposed project, the proposed trail improvements
would not result in substantial adverse effects to
scenic vistas.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with visual resources
nor result in new significant impacts.

No applicable
mitigation
measures.
202
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 58 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
help to mitigate the visual effects
resulting from borrow sites.

Construction of the approved project in
proximity to the highly sensitive
residential viewers and the
displacement of residents would result
in direct adverse effects.

Implementation of Mitigation Measure
VIS-MM-3 and the Property Acquisition
Compensation and Temporary Resident
Relocation Plan environmental
commitment described would help
mitigate the effects of nighttime
construction on residential viewers, but
effects still would be significant and
unavoidable. (Please refer to Section

3.13.3.6 for more detail.)
Significance Criterion VIS-2.

Adversely Affect a Scenic
Vista
Impact VIS 2: The approved project
identified significant impacts to visual
resources associated with impacts to
scenic vistas. Additionally, no feasible
mitigation measures or combination of
feasible mitigation measures would
avoid impacts to scenic vistas to reduce
this significant effect. Therefore, this
impact would be significant and
unavoidable.

According to the approved project, the
Sacramento River and South River Road
would be within the project area and
No feasible
mitigation.

According to the City of West Sacramento 2035
General Plan,9 adopted in 2016 (after the
certification of the proposed project), views of
elevated vantage points would be available from
levee roadways and crowns that include views of
the Sacramento skyline and the Vaca Mountains
make up the prominent elements of West
Sacramento’s scenic landscape. The City’s 2035
General Plan includes policies to protect these
natural scenic resources, including the City’s Design
Guidelines and the General Plan goals and policies.

The majority of the proposed trail alignment would
be located within the levee roadways and crowns,
No mitigation
required.
9 City of West Sacramento. 2016. West Sacramento General Plan 2035 EIR. Website: https://www.cityofwestsacramento.org/government/ departments/community-development/planning-division/general-plan-2035 (accessed January 18, 2023). 203
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 59 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
would act as gateways which offer
unique scenic vistas of the contrasting
landscape features. Vistas from the
river would be affected by vegetation
removal; however, removal of
vegetation would create new vistas
available from South River Road.

Overall, vistas would be adversely
affected by displaced agricultural fields,
development, and removal of trees and
shrubs necessary to construct the
approved project. Furthermore, the
approved project would construct a
new setback levee adjacent to the
existing levee which would introduce a
large mass into foreground views, and
the landside seepage berm would
introduce a wide swath of grassland
area that was once somewhat
developed and had trees and shrubs.

Also, depending on the reuse and
restored nature of borrow sites,
permanent landscape scars or
otherwise denuded and altered terrain
could result, which would adversely
affect visual quality. (Please refer to
Section 3.13.3.6 for more detail.)
which provide expansive views of the Sacramento
skyline and Vaca Mountains. Similar to the
approved project, the proposed project would
largely be surrounded by existing and proposed
residential and commercial development, park and
open space lands, and the Sacramento River.

Visible elements of the project would include the
proposed trail (unpaved and paved), wayfinding
signage, seating, and other trail infrastructure. Trail design would not include tall structures or
landscaping that might obscure views of the
surrounding Sacramento Skyline or views of the
Vaca Mountains from levee trail locations.

However, the proposed trail would be designed to
follow the existing topography of the approved
project, in order to minimize grading, to the extent
feasible. Furthermore, the proposed trail would
increase public access to currently inaccessible
levee areas, affording trail users scenic views from
the proposed trail alignment. Due to their relatively
small scale, the proposed trail improvements would
not result in substantial adverse effects to scenic
vistas.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with scenic vistas nor
result in new significant impacts.

Significance Criterion VIS-3.

Substantially Degrade the
Existing Visual Character or
Quality of the Site and Its
Surroundings
Impact VIS 3: The proposed project
identified that implementation of the
proposed project would result in
significant impacts to visual character.

The approved project would introduce a
new setback levee into the viewshed
No Feasible
Mitigation
The proposed project would be located on top of
the approved project site and would include the
development of a approximately 5.9-mile multi-use
trail, atop the approved project levee alignment.

Similar to the approved project, the proposed trail
would be visible from multiple publicly accessible
vantage points, including local roadways, open
No mitigation
required.
204
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 60 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
where residences, businesses,
agricultural fields, and vegetation once
existed. This impact would permanently
alter the existing viewshed and would
degrade the quality of the existing
viewshed. No feasible mitigation would
reduce this impact, and impacts would
be significant and unavoidable. (Please
refer to Section 3.13.3.6 for more
detail.)
space areas and residences. Portions of the trail
would be located along the levee of the Sacramento
River of the City, which provide views of the
Sacramento skyline and the Vaca Mountains.

During development of proposed trail, construction
activities and associated equipment could be visible
from public roadways and/or adjacent residential
and open space areas, resulting in temporary visual
impacts. Equipment required for trail construction
would be removed following completion of the trail
segment; therefore, these impacts would be
temporary.

Additionally, the proposed project includes goals
and policies to guide the development of the
proposed trail to ensure that the trail and
associated trail infrastructure preserve existing
scenic resources (e.g., limit impacts to riparian
vegetation, follow existing topography) and
enhance aesthetic appeal (i.e., provision of
interpretive signage). Although implementation of
the project could alter the visual character of the
project site through the provision of the trail and
associated trail facilities, implementation of the
proposed project would overall have a beneficial
effect on the visual character in these areas by
incorporating design features that would enhance
and blend with the existing visual character and
preserve natural scenic resources.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with the degradation
of visual character or quality nor result in new
significant impacts.
205
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 61 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion VIS-4.

Create a New Source of
Substantial Light or Glare
That Would Adversely Affect
Day or Nighttime Public
Views
Impact VIS-4: The approved project
identified that implementation of the
approved project would create
substantial light or glare, and impacts
would be significant.

The approved project would construct a
new adjacent levee next to the existing
levee which would introduce a new
visual feature in the environment and
likely displace agricultural fields or
development. This impact would be
exacerbated by the landside seepage
berm. While this could reduce nighttime
light to a small degree, it would
introduce a large surface of grass and
rock that would increase glare for all
viewer groups because there no longer
would be trees and shrubs to help
absorb sunlight and provide shade. This
impact would be significant, and there
is no feasible mitigation. (Please refer to
Section 3.13.3.6 for more detail.)
No Feasible
Mitigation
Similar to the approved project, the surrounding
land uses consist primarily of undeveloped open
space, residential development, and commercial
development. Additionally, the proposed project
would be located on top of the approved project.

Light sources of the proposed project would include
lights associated with nearby residences and
commercial development, existing streetlights on
local roadways, and vehicle headlights/taillights.

Daytime sources of glare include reflections off
light-colored surfaces and windows.

Views of the proposed project would remain similar
to the existing conditions under the approved
project and the proposed project would not
substantially increase the severity of light or glare
impacts. Additionally, the proposed project would
not install lighting along the trail alignment.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with light or glare nor
result in new significant impacts.

No mitigation
required.

Recreation
Significance Criterion REC-1
through REC-5
Impact REC-1 through REC-5: The
approved project identified either less
than significant or no impacts to REC-1
through REC-5. The approved project
would construct a new setback levee
which would provide new recreational
opportunities. While construction
would cause temporary disruption in
informal recreational activities along
the waterside of the Sacramento River
South Levee in the Southport project
No mitigation
required.

The proposed project would result in the
construction of trail improvements (e.g., site access,
parking, rest stop bulb-outs, signage and
monuments) to the approved project levee
alignment. Similar to the approved project, the
existing nearby recreational facilities include Delta
Gardens Park, Sacramento Yacht Club, and the
Sherwood Harbor Marina and RV Park. The
proposed project would not result in a population
increase or corresponding increase in the use of
recreational facilities within the City. Use of existing No mitigation
required.
206
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 62 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
area, the existing recreation areas
would not be closed. While recreational
activities in close proximity to
construction equipment and activities
may degrade recreational experiences.,
these impacts would be temporary, and
there would be alternative locations for
similar types of recreation activities in
the city. (Please refer to Section

3.14.3.6 for more detail.)
parks or other recreational facilities would not
increase such that substantial physical deterioration
of a facility would occur or be accelerated.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with recreation nor
result in new significant impacts.

Utilities and Public Services
Significance Criterion UTL-1:

Potential Temporary
Disruption of Domestic
Water Supply and
Irrigation/Drainage Facilities
due to Project Construction
Impact UTL-1: The approved project
identified that impacts to utilities and
water supply would be less than
significant with mitigation
incorporated.

The approved project would be serviced
by the following electrical and utility
purveyors:

Electricity and Gas. Electric and natural
gas services in West Sacramento are
provided by Pacific Gas and Electric
Company (PG&E), which operates a 12
kilovolt (kV) electrical distribution line
along South River Road. Additionally,
the Sacramento Municipal Utility
District manages a similar 12 kV line for
the Sacramento Regional County
Sanitation District (SRCSD) sewer pump
station. Chevron operates an 8-inch
petroleum underground pipeline
parallel to South River Road.

While the
approved project
prescribed
Mitigation
Measure UTL-MM1, this measure
would not be
applicable to the
proposed project.

As the approved project is located atop the existing
levee alignment of the approved project the
proposed project would be served by the same
electric and utility purveyors as the approved
project.

During construction of the multi-use trail and
associated improvements the proposed project
would not require the relocation or replacement of
any existing utilities.

Additionally, the proposed project would not
include the construction of any new buildings and
therefore would not require any new or relocated
utility lines or connections. In addition, the
proposed project, would not include any new
structures or facilities that would generate
wastewater or water demand, and as such, there
would be no impact to existing or future water
supplies or impact on wastewater treatment
services.

Therefore, the proposed project would not
substantially increase the severity of the previously
No applicable
mitigation
measures.
207
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 63 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Communication. Communication
services in the project area are provided
by multiple companies, including AT&T
and Pacific Bell. AT&T operates both
underground and overhead telephone
lines parallel to the Southport project
levee. The American Tower Corporation
also operates a cellular communication
tower at Linden Road and South River
Road.

Water Service. The City’s main water
source is the Sacramento River, with
water treated at the Bryte Bend Water
Treatment Plant. Water distribution
infrastructure exists mainly in the Riva
subdivision and south of Linden Road,
while most nearby properties rely on
private wells. A preliminary estimate
indicates at least 38 domestic wells and
six irrigation wells within 500 feet of the
Southport levee.

Stormwater and Drainage. The majority
of the Southport area is within
Reclamation District 900, with primary
drainage facilities being the Main
Drainage Canal and the Main Drain
Pump Station. These facilities manage
stormwater, discharging it into the
Deep-Water Ship Channel (DWSC). The
project area also includes storm drain
inlets, manholes, and a main storm
drain line.
identified impacts associated with utilities nor
result in new significant impacts.
208
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 64 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Wastewater. The City is responsible for
collection and treatment of wastewater
within the community. The wastewater
Treatment Plant (WWTP) on South River
Road, which would service the
approved project site, has a treatment
capacity of 7.5 million gallons per day.

Wastewater would be transported
through a network of collector lines and
pump stations, with two operating
pump stations serving different areas in
Southport. The Sacramento Regional
County Sanitation District manages a
120-inch gravity sewer interceptor
pipeline running through the project
area.

Implementation of the approved project
would require modifications to
domestic water supply, irrigation, and
drainage infrastructure. Construction
could result in the need to temporarily
take individual water supply and
drainage infrastructure elements out of
service for short periods, anticipated to
last no longer than 4 hours at a time.

Because the approved project has the
potential to damage or cause delay in
provisions of water supply and drainage
infrastructure elements, Mitigation
Measure UTL-MM-1 would be required
to reduce this effect to a less than
significant level.
209
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 65 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Significance Criterion UTL-2:

Decrease in Domestic and
Irrigation Water Supply
Impact UTL-2: The approved project
identified that impacts to domestic
water supply would be less than
significant with mitigation
incorporated.

Implementation of the project,
particularly the construction of slurry
cutoff walls, would result in a
combination of lower static and
pumping groundwater levels on the
landside of the cutoff walls during most
periods. Additionally, wells could
experience reduced pumping capacities
due to a combination of lower static
water levels and increased drawdown.

As discussed in the approved project,
some levee segments would experience
slightly reduced capacities because of
generally lower water levels caused by
the cutoff wall. In almost all cases, wells
could continue to pump enough water
to meet existing demands, but some
well owners may experience slightly
increased pumping costs.

Implementation of Mitigation Measure
UTL-MM-2 would reduce this impact to
a less than significant level. (Please
refer to Section 3.14.3.6 for more
detail.)
While the
approved project
prescribed
Mitigation
Measure UTL-MM2, this measure
would not be
applicable to the
proposed project.

The proposed project would be located atop the
existing levee of the approved project. Although,
construction of the proposed project would
temporarily require small amounts of water for
cleanup activities, water would be provided via a
water truck as no utility lines exist along the
majority of the proposed trail alignment. The use of
water would cease when construction is complete.

Sufficient water supplies are available to provide for
the project’s minimal water needs during the
construction phase of the project. Water would not
be required for long-term operation of the project
as no potable or non-potable water facilities are
proposed. Additionally, the proposed project would
not include any major levee modification that
would cause a decrease in water supply.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with water supply nor
result in new significant impacts.

Significance Criterion UTL-3:

Damage of Public Utility
Infrastructure and
Disruption of Service as a
Impact UTL-3: The approved project
identified that impacts associated with
utility infrastructure would result in a
less than significant impact with
mitigation incorporated.

While the
approved project
prescribed
Mitigation
Measure UTL-MMThe proposed project would include the
construction of a paved multi-use trail, and
associated improvements located atop the existing
levee alignment of the approved project. The
No applicable
mitigation
measures.
210
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 66 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Result of Project
Construction
Construction of the approved project
would require the relocation of utility
infrastructure, potentially leading to
temporary service disruptions. The
existing infrastructure on the project
area, included telephone lines, electric
lines, water lines, a Chevron petroleum
line, storm drains, and sewer utilities.

Construction of the setback levee and
associated flood risk improvements
would repair, relocate, or replace these
utilities.

Additionally, construction service
interruptions could occur due to
existing utilities being taken offline or
accidental damage to both identified
and unidentified infrastructure.

Implementation of Mitigation Measure
UTL-MM-3 would reduce this impact to
a less than significant level. (Please
refer to Section 3.14.3.6 for more
detail.)
3, this measure
would not be
applicable to the
proposed project.
proposed project would not require the relocation
or replacement of utilities.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with utilities nor
result in new significant impacts.

Significance Criterion UTL-4:

Increase in Solid Waste
Generation due to Project
Construction
Impact UTL-4: The approved project
identified that implementation of the
approved project would result in less
than significant effects associated with
solid waste generation. (Please refer to
Section 3.14.3.6 for more detail.)
Implementation of approved project
could generate up to approximately
613,500 cubic yards of solid waste that
would require disposal. Sources of solid
waste related to construction activities
No mitigation
required.

Similar to the approved project, the proposed
project would generate a small amount of solid
waste during construction of the proposed project.

Like the approved project, waste would be hauled
to the Yolo County Central Landfill. Currently, the
Yolo County Central Landfill has an expected
disposal capacity through the year 2124, has a
remaining capacity of 33,544,909 cubic yards, and is
permitted to receive 1,800 tons of solid waste per
No mitigation
required.
211
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 67 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
would include cleared vegetation and
structural debris from removal of
residences and agricultural structures
within the project footprint Some waste
from the existing levee may be reused
for new levee construction if deemed
suitable; otherwise, it will be disposed
of appropriately.

Excavated fill material for flood risk
reduction would be evaluated for reuse
before disposal. Solid waste would
generally be transported to the Yolo
County Central Landfill, though the
contractor may select other landfills
based on capacity and waste type. As of
July 2011, the Yolo County Central
Landfill had a remaining capacity of 36.5
million cubic yards, with closure
projected for 2070. Assuming all solid
waste from the project requires
permanent disposal, it would represent
less than 1% of the landfill's remaining
capacity.
day.10 As such, the proposed project would not
affect landfill capacity and would comply with all
statutes and regulations related to solid waste.

Therefore, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with solid waste nor
result in new significant impacts.

Significance Criterion UTL-5:

Increase in Emergency
Response Times during
Project Construction
Impact UTL-5: The approved project
identified that implementation of the
approved project would result in less
than significant effects on emergency
response times during project
construction.

No mitigation
required.

Similar to the approved project, the proposed
project would be served by the WSFD for fire and
emergency medical services (EMS) and by the
WSPD for police protection services. Additionally,
similar to the approved project, the proposed
project would not result in the need for additional
or altered fire or police protection services and
No mitigation
required.
10 CalRecycle. 2021. SWIS Facility/Site Activity Details, Yolo County Central Landfill (57-AA-0001). Website: https://www2.calrecycle.ca.gov/Solid Waste/SiteActivity/Details/689?siteID=4033 (accessed February October 1, 2024). 212
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 68 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
The approved project would be served
by the City of West Sacramento Fire
Department (WSFD) and the City of
West Sacramento Police Department
(WSPD).

Emergency access to the approved
project site and the project vicinity
could be affected by construction of the
levee. Construction-related traffic could
delay or obstruct the movement of
emergency vehicles. However, the
development and implementation of a
Traffic Control and Road Maintenance
Plan would minimize constructionrelated impacts on emergency response times. (Please refer to Section 3.14.3.6
for more detail.)
would not increase within the vicinity of the project
site. Like the approved project, the proposed
project would not include housing units or other
structures. Therefore, the demand for fire and
police protection services would not substantially
increase with development of the proposed project.

In addition, the proposed project would result in
better access along the existing Southport setback
levee, and therefore would aid in timely response
for medical emergencies.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with public services
nor result in new significant impacts.

Public Health and Environmental Hazards
Significance Criterion HAZ1: Incidental Release of
Hazardous Materials during
Construction
Impact HAZ-1: The approved project
identified less than significant impacts
to the incidental release of hazardous
material during construction.

Implementation of the proposed project
would require the use of hazardous
materials such as fuels and lubricants to
operate construction equipment.

Construction contractors would be
required to use, store, and transport
hazardous materials in compliance with
federal, State, and local regulations
during project construction. The
approved project would be required to
implement ECs (environmental
commitments), including a SWPPP, a
No mitigation
required.

Similar to the approved project, construction of the
proposed project would require the use and
transport of hazardous materials, such as fuels, oils,
and other chemicals used during construction
activities. As noted in Impact WQ-2, construction
activities at the project site would require
implementation RCM HYD-1, which requires the
preparation of a SWPPP. The SWPPP would
incorporate current BMPs for construction,
including site housekeeping practices, hazardous
material storage, inspections, maintenance, worker
training in pollution prevention measures, and
containment of releases to prevent runoff via
stormwater. Although designed to protect
stormwater quality, implementation of the SWPPP
would also reduce the potential impacts of
New Regulatory
Compliance
Measures:

RCM HYD-1
(refer to
Attachment A)
213
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 69 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
BSSCP, and an SPCCP, to would ensure
that the risk of accidental spills and
releases into the environment would be
minimal. (Please refer to Section

3.15.3.6 for more detail.)
hazardous materials releases during construction to
a less than significant level.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with the release of
hazardous materials nor result in new significant
impacts.

Significance Criterion HAZ2: Exposure of Hazardous
Materials Encountered at
Project Site
Impact HAZ-2: The approved project
identified that implantation of the
approved project would have less than
significant impacts to the exposure of
hazardous materials at the project site.

The approved project site had
approximately 80 parcels identified as
having 15 potential recognized
environmental conditions (RECs), and 1
parcel is currently known to have
detectable petroleum hydrocarbon
contamination. Construction of the
approved would include excavation and
ground disturbing activities at or near
areas of currently unrecorded soil or
groundwater contamination which
could result in the direct exposure of
construction workers, the general
public, and the environment to
hazardous materials such as petroleum
hydrocarbons, pesticides, herbicides,
fertilizers, and contaminated debris or
No mitigation
required.

The proposed project would be located atop of the
approved project, as such the proposed project
would result in similar impacts to hazardous
materials.

As the proposed project would only be located atop
the existing levee alignment, the proposed project
would not include the entire footprint as the
approved project. As such, the proposed project
site is not listed on any list of hazardous materials
sites compiled pursuant to Government Code
Section 65962.5.11 According to the State Water
Resources Control Board’s Geotracker website,
three listed sites are located in proximity to the
proposed trail alignment.12 These sites are listed
below.
• Closed Cleanup Program Site of the Former Time
Oil West Sacramento located at 1155 Linden
Road
• Closed Leaking Underground Storage Tank
(LUST) Cleanup site of the Caltrans West
No mitigation
required.
11 California Environmental Protection Agency. 2023. Cortese List Data Resources. Website: calepa.ca.gov/sitecleanup/corteselist (accessed February 16, 2023). 12 State Water Resources Control Board (SWRCB). 2023. GeoTracker. Website: geotracker.waterboards.ca.gov (accessed February 16, 2023). 214
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 70 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
elevated levels of other chemicals that
could be hazardous. Implementation of
the Soil Hazards Testing and Soil
Disposal Plan from the approved project
would reduce impacts to a less than
significant level. (Please refer to Section

3.15.3.6 for more detail.)
Sacramento Yard located at 1040 South River
Road
• Closed LUST Cleanup site for the Wastewater
Treatment Plant located at 1991 South River
Road
All three sites, as listed above, are designated as
“Completed—Case Closed.” A closed site indicates
that regulatory requirements for response actions,
such as site assessment and remediation, have
either been completed or were not necessary and
therefore potential migration of residual
contaminants in groundwater beneath the project
site (if any) does not likely pose a risk to human
health and the environment. Therefore, no
significant hazard to the public or environment
would be associated with these listed sites.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with the exposure of
hazardous materials on the project site nor result in
new significant impacts.

Significance Criterion HAZ3: Safety Hazards from the
Construction Site and
Vehicles
Impact HAZ-3: Construction of the
approved project could create safety
hazards at the project site as workers
would operate vehicles and other
mechanical equipment that, if used
improperly, could result in safety
hazards. West Sacramento Area Flood
Control Agency (WSAFCA) would ensure
that all workers are properly trained to
operate equipment. Safety precautions
would be followed at all times during
construction to avoid accidents.

WSAFCA also would require that all
No mitigation
required.

Similar to the proposed project, the proposed
project would include the use of construction
vehicles and other mechanical equipment. Like the
approved project, WSAFCA would ensure that all
workers are properly trained to operate equipment,
and the proposed project would require that safety
precautions would be followed at all times and
would also require all workers have a valid driver’s
license and insurance. These measures would
ensure that this impact would be less than
significant.

No mitigation
required.
215
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 71 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
workers have a valid driver’s license and
insurance. These measures would
ensure that this impact would be less
than significant. (Please refer to Section

3.15.3.6 for more detail.)
As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with the safety
hazards nor result in new significant impacts.

Significance Criterion HAZ4: Exposure of People or
Structures to Flood RiskRelated Hazards
Impact HAZ-4: The approved project
identified that implementation of the
proposed project would not expose
people or structures flood risk and there
would be no impact.

According to the approved project,
levees have the potential to fail,
regardless of design. Under the
approved project, the existing levee
would be modified using methods that
meet engineering requirements set
forth by the approved project and the
WSAFCA, USACE and the Central Valley
Flood Protection Board (CVFPB). In
addition, the approved project would
comply with Federal Emergency
Management Agency (FEMA)
requirements, ensuring sufficient
performance to reduce flood risk from a
200-year event. (Please refer to Section

3.15.3.6 for more detail.)
No mitigation
required.

The proposed project would be located on top of
the approved project site and would only include
minor modifications to the top of the levee such as
construction of a recreational trail, signage, and
other and associated improvements. The proposed
project would be location on the crown of the
exiting levee with elevations ranging from 34 and
40 feet. As such, the proposed project would be
protected from flooding by the existing a levee, the
proposed project would not expose people or
structures to flood risk.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with flood risks nor
result in new significant impacts.

No mitigation
required.

Significance Criterion HAZ5: Accidental Release of
Hazardous Materials into
the Environment during
Project Construction or
Operation
Impact HAZ-5: The approved project
identified less than significant impacts
related to the accidental release of
hazardous materials into the
environment.

According to the approved project,
Chevron operates an 8-inch petroleum
underground pipeline that runs parallel
While the
approved project
prescribed
Mitigation
Measure HAZMM-1, this
measure would not
be applicable to
The proposed project would be located in the same
location as the approved project; however, the
proposed project would only include excavation for
trail signs at a maximum depth of 14 inches. The
proposed project would not excavate outside the
levee alignment and would not interfere with
existing utilities or pipelines.

No applicable
mitigation
measures.

New Regulatory
Compliance
Measures:
216
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 72 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
to South River Road. ground-disturbing
activities during construction could
interfere with pipeline maintenance
necessary to protect public safety could
accidentally cause a rupture in these
pipelines, resulting in the release of
petroleum or wastewater into the
surrounding area. This release would
result in soil and groundwater
contamination and could have a direct
adverse on public health. Therefore,
with implementation of Mitigation
Measure HAZ-MM-1, impacts would be
reduced to a less than significant level.
(Please refer to Section 3.15.3.6 for
more detail.)
the proposed
project.

Additionally, construction at the project site would
require the use and transport of hazardous
materials. These materials would include fuels, oils,
and other chemicals used during construction
activities. Improper use and transportation of
hazardous materials could result in accidental
releases or spills, potentially posing health risks to
workers, the public, and environment.

As noted in Impact WQ-2, construction activities at
the project site would require implementation of
RCM HYD-1, which requires the preparation of a
SWPPP. The SWPPP would incorporate current
BMPs for construction, including site housekeeping
practices, hazardous material storage, inspections,
maintenance, worker training in pollution
prevention measures, and containment of releases
to prevent runoff via stormwater. Although
designed to protect stormwater quality,
implementation of the SWPPP would also reduce
the potential impacts of hazardous materials
releases during construction to a less than
significant level.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with the release of
hazardous materials nor result in new significant
impacts.

RCM-1 (refer to
Attachment A)
Cultural Resources
Significance Criterion CUL-1:

Effects on Architectural
(Built Environment)
Resources (the Sacramento
River Levee)
Impact CUL-1: The approved project
identified a significant effect to the
architectural (built environment)
resources (the Sacramento River Levee).

While the approved project identified
CUL-MM-1 to would reduce the
While the
approved project
prescribed
Mitigation
Measure CUL-MM1 to reduce
LSA conducted records searches (at the North
Central Information Center [NCIC] and the
Northwest Information Center [NWIC]), a literature
and map review, a search of the Sacred Lands File
at the Native American Heritage Commission
(NAHC), outreach to historical societies, and an
No applicable
mitigation
measures.
217
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 73 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
intensity of the impact, this impact
would still be significant and
unavoidable.

According to the approved project, a
total of 31 properties containing
buildings or structures at least 50 years
old were identified in the study area.

This includes 27 residential properties,
two remnants of railroad bridges linked
to the Sacramento Northern Railway, a

5.6-mile segment of the Sacramento
River Levee, and several docking
structures along the levee. However,
field surveys indicated that the segment
of the Sacramento Northern Railway no
longer exists, having been replaced by a
public trail, which led to its exclusion
from the survey population.

The only resource identified as eligible
for the National Register of Historic
Places (NRHP) and the California
Register of Historical Resources (CRHR)
is the 5.6-mile segment of the
Sacramento River Levee. The portion of
Sacramento River Levee in the study
area appears to meet NRHP and CRHR
criteria.

Construction of the approved project
would demolish or substantially alter
the physical characteristics of the levee
or cause a major change to its
engineering design or overall setting.

Therefore, the direct effect on the levee
impacts to the
approved project,
this measure is not
applicable to the
proposed project.
architectural field survey. An archaeological survey
was not required because the entire APE (Area of
Potential Effects) sits on historical or modern fill,
and there is no potential for in situ archaeological
resources to be identified on the existing ground
surface within the APE.

Due to the proximity of the project area to the
County line, the records search study area radius
includes portions of two counties (Sacramento and
Yolo) and therefore separate records searches were
required at the North Central Information Center
(NCIC for Sacramento County) and the Information
Center (NWIC for Yolo County). In April 2023, the
cultural resources records searches were conducted
for the project area by staff at the respective
information centers. The records searches included
a review of all recorded historic and prehistoric
archaeological sites within 0.25-mile of the project,
as well as a review of cultural resource reports on
file.

Results from the NCIC indicate 33 cultural resources
studies were previously conducted in Sacramento
County within a 0.25-mile of the proposed project
area (the project area itself is located across the
County line, entirely within Yolo County, on the
opposite side of the Sacramento River). Thirteen
cultural resources have been recorded within a

0.25-mile radius. These consist of prehistoric
habitation (P-34-000055 and P-34-000057) and
lithic scatter (P-34-005379) sites, historic-period
bents/piers/pilings of the former Da Rosa Marina
(P-34-004261 and P-34-004262), a Southern Pacific
railroad alignment (P-34-001497/CA-SAC-001092H),
218
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 74 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
would be significant. (Please refer to
Section 3.16.3.6 for more detail.)
part of the Sacramento River levee system (P-34-
002143), sonar anomalies indicating possible
sunken boats and a floating dock (P-34-004464, P34-004465, P-35-004472, P-35-004473), a remnant brickyard (P-34-005258), and a drainage pipe (P-34-
005642).

Results from the NWIC indicate 43 cultural
resources studies were previously conducted in
Yolo County within a 0.25 mile of the proposed
project; 28 of these include portions of the project
area). Twenty-five cultural resources have been
recorded within a 0.25-mile radius of the project; 5
of these overlap the proposed project area and are
listed in Table E. It should be emphasized that, on
the ground, most of these 5 overlapping resources
do not actually physically touch the project area:
the project area sits on top of constructed levee
and consequentially is elevated above recorded
resources on the surrounding floodplain that
extend below the levee (see Table E). The
remaining resources within the 0.25-mile search
radius consist of 6 properties with historical
buildings (P-57-000564, P-57-001142, P-57-001145,
P-57-001148 through -001150), wood pilings (P-57-
000425), remnant possible wharf/landing (P-57-
000607/CA-YOL-222H), part of the Sacramento
River levee system (P-57-000632/CA-YOL264H), a
sonar anomaly indicating a possible sunken boat (P57-000660), a ditch (P-57-001153), three prehistoric habitation sites (two with historical components)
(P-57-001291/CA-YOL-248/H, P-57-001396/CA-YOL253/H, P-57-001397/CA-YOL-254), the South Cross Levee (P-57-0011563/CA-YOL-267H), and the Port
Levee South (P-57-0011565/CA-YOL-269H).
219
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 75 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
Table E: Previously Recorded Cultural Resources
within the APE
Previously Recorded
Resource
Location within Project
Area
P-57-000107;
prehistoric site
No longer within
project area
P-57-000195/CA-YOL179H; part of
Sacramento Northern
Railway alignment
Unevaluated segment
of this resource and a
wooden trestle within
APE.

P-57-000530; earthen
ditch
Culverted under levee,
crossing below project
area near Davis Road
River Access location
P-57-001126; parcel
with historical buildings
No longer within
project area
P-57-001146; parcel
with historical buildings
No longer within
project area
P-57-001147; parcel
with historical buildings
No longer within
project area
P-57-001152; earthen
ditch
Culverted under levee,
crossing below project
area at southern end of
Chicory Loop
P-57-001455/CA-YOL255; prehistoric siteBelow project area, roughly between ends
of Chicory Loop
P-57-001521;
Sacramento River West
Levee segment
Mapped location on file
at the NWIC shows
levee outside the
project area; however,
based Google Earth
imagery, sections of the
historical levee
220
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 76 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
comprise portions of
the project area
Source: Compiled by LSA (2024) using information from the Northwest Information Center, Sonoma State University, Rohnert Park, California.

As shown in Table E, P-57-001565/CA-YOL-269H;
Port Levee South consists of an approximately 800-
foot segment of earthen levee built in July 1949 and
continuously improved through October 1964 after
the Sacramento Deep Water Shipping Channel was
built. It is assumed that the approximately 800-foot
levee segment in the APE was built at the same
time using the same methods and materials in the
previously recorded segments of this levee. On
February 24, 2021, Office of Historic Preservation
staff assigned a California Historical Resource Status
Code of “3D”, indicating the previously recorded
segment of this same levee appeared “eligible for
(inclusion in the) N[ational] R[egister] as a
contributor to a N[ational] R[egister] eligible multicomponent resource through survey evaluation.” Accordingly, this resource is also eligible for
inclusion in the California Register of Historical
Resources (California Register) and is a historical
resource for the purposes of CEQA.

P-57-001521; Sacramento River West Levee,
consists of an approximately 5.5-mile earthen levee
along the west bank of the Sacramento River. The
levee was in place by 1916 and later modified for
maintenance and repair damage. The entire 5.5-
mile segment in the APE was previously evaluated
in 2013 by ICF International cultural resource staff
221
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 77 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
and found it eligible for inclusion in the National
Register of Historic Places (National Register) and
the California Register under Criterion A/1 (events)
for its association with “flood management, the
agricultural and economic development of the
Sacramento Valley and the Sacramento River Flood
Control Project” (ICF 2013:2). On October 17, 2019,
Office of Historic Preservation staff assigned this
resource a California Historical Resource Status
Code of “2S2” indicating it was “[i]ndividually
determined eligible for (inclusion in the) N[ational]
R[egister] by consensus through the Section 106
process.” Accordingly, this resource is also eligible
for inclusion in the California Register and is a
historical resource for the purposes of CEQA.

P-57-000195/CA-YOL-179H; Sacramento Northern
Railway, consists of an approximately 1,600-foot
segment of the former alignment of the
Sacramento Northern Railway which extends from
Oakland to Chico via Sacramento. Previously
recorded segments in 10 other counties were found
eligible for the National Register and other
segments found ineligible. The segment in the APE
has not been previously evaluated and is currently
used as a bicycle and pedestrian trail that includes
an approximately 60-foot long, 15-foot-tall wooden
trestle that carries the former alignment over South
River Road.

No archeological resources were identified within
the APE although three were recorded outside the
APE beneath and adjacent to sections of levee upon
which the APE sits.
222
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 78 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
The proposed improvements as described above
would result in direct physical changes to features
along this total 5.9-mile segment of earthen levee
within the APE. However, the undertaking would
result in no adverse effect to either the Port Levee
South or Sacramento River West Levee segments in
the APE, as the project improvements would occur
at ground level and in areas subsequently modified
after the close of their respective periods of
significance. These levees would retain the aspects
of integrity that allow them to convey their historic
significance.

As such, the proposed project would not
substantially increase the severity of the previously
identified impacts associated with historic
resources, nor result in new significant impacts.

Significance Criterion CUL-2:

Change in the Significance of
an Archaeological Resource
Impact CUL-2: The approved project
identified a significant effect to a
change in significance of archaeological
resource. While the approved project
identified CUL-MM-2 and CUL MM-3 to
would reduce the intensity of the
impact, this impact would still be
significant and unavoidable.

The approved project was not fully
surveyed due to rights of entry to all
affected parcels; however, no
archaeological resources were found
surveyed areas. There is the possibility,
however, that construction of the
approved project would unearth
archaeological materials from beneath
the ground surface that cannot
While the
approved project
prescribed
Mitigation
Measures CULMM-2 and CULMM-3 to reduce
impacts to the
approved project,
these measures
are not applicable
to the proposed
project.

Please refer to Impact CUL -1, above, for a detailed
discussion of resources within the APE.

Because the entire APE sits on historical or modern
fill, there is no potential for in situ archaeological
resources to be identified on the existing ground
surface within the APE. The proposed project, as
designed, will not extend into undisturbed soil
anywhere due to its location on modern or
historical fill (i.e., the constructed levees and
railroad grade) and the anticipated minimal depths
of ground disturbance (14 inches below ground
surface) associated with proposed construction.

However, it is possible that relocated archaeological
materials may be present if these materials were
part of the sediments used to construct the extant
levees and railroad grade.

New Mitigation
Measures:

Mitigation
Measures CUL1 through Cul-3
(refer to
Attachment A)
223
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 79 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
currently be identified because of
limited access and because of the
infeasibility of identifying all buried
resources prior to construction. (Please
refer to Section 3.16.3.6 for more
detail.)
Additionally, although the APE, is unlikely to contain
intact archaeological resources, the area
surrounding the APE is highly sensitive. Previously
recorded archaeological sites within vicinity of the
APE include a large pre-contact site (P-57-001455)
on the floodplain below and adjacent to the APE, as
well as other pre-contact and multi-component
sites (P-57-001291, P-57-001396, P-57-001397, P57-000107).

Therefore, implementation of Mitigation Measures
CUL-1 through CUL-4, as identified in the proposed
project, which include archaeological monitoring
during ground-disturbing activities, Worker’s
Environmental Awareness Program (WEAP)
training, and protocols for inadvertent discoveries
of archaeological deposits or human remains,
would ensure that any potential impacts are
reduced to a less-than-significant level. As such, the
proposed project would not substantially increase
the severity of previously identified impacts or
result in new significant impacts.

Significance Criterion CUL-3:

Disturbance of Native
American and HistoricPeriod Human Remains
Impact CUL-3: The approved project
identified a significant effect to the
disturbance of Native American
Historic-Period Human Remains.

While the approved project identified
CUL-MM-4 to reduce the intensity of
this impact, this impact would still be
significant and unavoidable. The
approved project is in an area that is
sensitive for archaeological cultural
remains, including burials. According
the to the approved project, the
While the
approved project
prescribed
Mitigation
Measure CUL-MM4 to reduce duce
impacts to the
approved project,
this measure is not
applicable to the
proposed project.

As stated above in Impact CUL-2, although there is
low sensitivity for in situ archaeological resources
within the APE, the area surrounding the APE is
highly sensitive as indicated by previously recorded
archaeological sites. These sites include a large precontact site (P-57-001455) on the floodplain below and adjacent to the APE, as well as other precontact and multi-component sites (P-57-001291, P-57-001396, P-57-001397, P-57-000107) are
located in the vicinity of the APE.

New Mitigation
Measures:

Mitigation
Measure CUL-1
and CUL-4
(refer to
Attachment A)
224
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 80 Table B: EIR Impact Analysis Summary
Resource Summary of Certified EIR Analysis
Previous
Mitigation
Measures
Potential Project Impacts
Applicable
Mitigation
Measures
potential for buried human remains to
be unearthed during ground-disturbing
activities is considered high and the
disturbance of any human remains is
considered a significant direct effect.
(Please refer to Section 3.16.3.6 for
more detail.)
Therefore, implementation of Mitigation Measures
CUL-1 through CUL-4, as identified in the proposed
project, which include archaeological monitoring
during ground-disturbing activities, Worker’s
Environmental Awareness Program (WEAP)
training, and protocols for inadvertent discoveries
of archaeological deposits or human remains,
would ensure that any potential impacts are
reduced to a less-than-significant level. As such, the
proposed project would not substantially increase
the severity of previously identified impacts
associated with the disturbance of human remains,
nor would it result in new significant impacts.
225
12/11/24 (P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx) 81

CONCLUSION
On the basis of the evaluation presented above, the proposed project, if implemented, would not trigger any of the conditions listed under the CEQA Framework for Addendum section of this Addendum, requiring preparation of a subsequent or supplemental EIR. Thus, this Addendum satisfies the requirements of State CEQA Guidelines Sections 15162 and 15164. The modifications to the approved project’s existing setback, including the construction of a paved 5.9-mile multi-use trail and associated improvements, would not introduce new significant environmental effects, substantially increase the severity of previously identified significant environmental effects, or demonstrate that mitigation measures or alternatives previously found not to be feasible would in fact be feasible. The proposed changes that would be implemented as part of the proposed project would not alter the findings in the approved project. In addition, no change has occurred with respect to the circumstances surrounding the proposed project that would cause new or substantially more severe significant environmental effects than identified in the approved project, and no new information has become available that shows that the project would cause significant environmental effects not already analyzed in the approved project. Therefore, no further environmental review is required beyond this Addendum to the approved project.

Attachments: A: Mitigation Monitoring and Reporting Program B: CalEEMod Worksheets
C: CNDDB and IPaC Record Searches
226
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx (12/11/24)

A DDENDUM TO THE S OUTHPORT S ACRAMENTO RIVER E ARLY

I MPLEMENTATION P ROJECT
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

CITY OF WEST S ACRAMENTO , C ALIFORNIA

ATTACHMENT A

UPDATED MITIGATION MONITORING AND

REPORTING PROGRAM
227
A-1

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
RCM HYD-1
Construction General Permit.

The Project Applicant shall
obtain coverage under the
State Water Resources
Control Board (SWRCB)
National Pollutant Discharge
Elimination System (NPDES)
General Permit for
Stormwater Discharges
Associated with Construction
and Land Disturbance
Activities (Order No. 2022-
0057-DWQ, National Pollutant
Discharge Elimination System
No. CAS000002) (Construction
General Permit). This shall
include submission of Permit
Registration Documents
(PRDs), including a Notice of
Intent for coverage under the
permit to the State Water
Resources Control Board
(SWRCB) via the Stormwater
Multiple Application and
Report Tracking System
(SMARTs). The Project
Applicant shall provide the
Waste Discharge Identification
Number (WDID) to the
Planning Manager of the City
of West Sacramento Planning
Division or designee, to
demonstrate proof of
Prior to
issuance of
grading permit,
during
construction,
after the
completion of
construction
City of West
Sacramento / Project
Engineer
SWRCB/City of
West
Sacramento
Prior to issuance of
grading permit, during
construction, after the
completion of
construction
Preparation and
implementation of
a SWPPP in
compliance with
the requirements
of the Construction
General Permit,
submission of a
Notice of
Termination upon
completion of
construction.
228
A-2

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
coverage under the
Construction General Permit.

Project construction shall not
be initiated until a WDID is
received from the SWRCB and
is provided to the City, or
designee.

A Stormwater Pollution
Prevention Plan (SWPPP) shall
be prepared by a Qualified
SWPPP Developer in
accordance with the
requirements of the
Construction General Permit.

These include: BMPs for
erosion and sediment control,
site management/
housekeeping/waste
management, management of
non-stormwater discharges,
run-on and runoff controls,
and BMP
inspection/maintenance/repai
r activities. BMP
implementation shall be
consistent with the BMP
requirements in the most
recent version of the
California Stormwater Quality
Association’s Stormwater Best
Management Handbook:

Construction.
229
A-3

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
The SWPPP shall include a
construction site monitoring
program that identifies
requirements for dry weather
visual observations of
pollutants at all discharge
locations, and as appropriate
(depending on the Risk Level),
sampling of the site effluent
and receiving waters. A
Qualified SWPPP Practitioner
shall be responsible for
implementing the BMPs at the
site and performing all
required monitoring and
inspection/maintenance/repai
r activities.

Upon completion of
construction and stabilization
of the site, a Notice of
Termination shall be
submitted via SMARTs.
230
A-4

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
RCM HYD-2
Erosion and Sediment Control
Plan. Prior to the issuance of a
grading permit or
construction permit, the
Project Applicant shall submit
an Erosion and Sediment
Control Plan (ESCP) to the City
of West Sacramento
Community Development
Department as required by
Section 15.08.180 of the West
Sacramento Municipal Code.

The ESCP shall address
erosion and sediment control
and pollution prevention
during the construction phase
and final stabilization control
measures. The ESCP shall be
implemented year-round and
must be updated to reflect
changing conditions on the
project site.

Prior to the
issuance of a
grading permit
or construction
permit
City of West
Sacramento
City of West
Sacramento
Prior to the issuance
of a grading permit or
construction permit
Preparation and
implementation of
an Erosion and
Sediment Control
Plan as required by
Section 15.08.180
of the West
Sacramento
Municipal Code.

RCM HYD-3
Small Municipal Separate
Storm Sewer Systems MS4
Permit. Prior to issuance of
grading or building permits,
the project applicant, or
designee, shall submit a Final
Storm Water Management
Plan (SWMP) to the City of
West Sacramento, for review
and approval, in compliance
with the National Pollutant
Prior to
issuance of
grading or
building permits
City of West
Sacramento / Project
Engineer
City of West
Sacramento
Prior to issuance of
grading or building
permits
Submission and
approval of a Final
SWMP in
compliance with
the MS4.
231
A-5

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
Discharge Elimination System
(NPDES) General Permit for
Waste Discharge
Requirements (WDRs) for
Storm Water Discharges from
Small Municipal Separate
Storm Sewer Systems (MS4s)
RWQCB Order No. 2013-001-
DWQ, NPDES No. CAS000004,
as amended by Order 2015-
0133-EXEC, Order WQ 2016-
0069-EXEC, Order 2017-XXXXDWQ, Order 2018-0001-EXEC,
and Order 2018-0007-EXEC.

The project applicant shall
demonstrate compliance with
the MS4 through site design
measures, source control
measures, Low Impact
Development (LID) Design
Standards, Hydromodification
Measures, Operation and
Maintenance of Storm Water
Control Measures, and PostConstruction BPMs in the
SWMP. Additionally, the 10-
and 100-year postdevelopment peak flows shall
be reduced to 85 percent of
pre-development levels.

Finally, the MS4 requires
ongoing water quality
monitoring and corrective
232
A-6

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
actions if water quality
thresholds are not
maintained. The City of West
Sacramento, or designee, shall
ensure that the SWMP
complies with the MS4.

RCM HYD -4
Runoff Control Plan. Prior to
issuance of grading or
construction permits, the
project applicant, or designee,
shall submit a Runoff Control
Plan to the City of West
Sacramento Community
Development Department per
West Sacramento Municipal
Code Section 15.08.280. The
project applicant shall
implement conditions of
approval that reduce
stormwater pollutant
discharges through the
construction, operation and
maintenance of source
control measures, low impact
development design, site
design measures, stormwater
treatment measures and
hydromodification
management measures.

Increases in runoff shall be
managed in accordance with
the development runoff
requirements.

Prior to
issuance of
grading or
building permits
or construction
permits
City of West
Sacramento / Project
Engineer
City of West
Sacramento
Prior to issuance of
grading or building
permits or
construction permits
Submission and
approval of a
Runoff Control Plan
in compliance with
the West
Sacramento
Municipal Code
Section 15.08.280
233
A-7

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
MM-AIR-1
Air Quality Dust Control
Measures. The City or
construction contractor shall
implement the following
measures at the project site:
 Water all active
construction sites at least
twice daily. Frequency shall
be based on the type of
operation, soil, and wind
exposure.
 Haul trucks shall maintain
at least 2 feet of freeboard;
 Cover all trucks hauling
dirt, sand, or loose
materials;
 Apply non-toxic binders
(e.g., latex acrylic
copolymer) to exposed
areas after cut and fill
operations and hydroseed
area;
 Apply chemical soil
stabilizers on inactive
construction areas
(disturbed lands within
construction projects that
are unused for at least four
consecutive days);
During
construction
City of West
Sacramento /
Construction
contractor
City of West
Sacramento During construction
Successful
implementation of
dust control
measures during
construction
activities
234
A-8

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
 Plant vegetative ground
cover in disturbed areas as
soon as possible;
 Cover inactive storage
piles; and
 Sweep streets if visible soil
material is carried out from
the construction site.
 Treat accesses to a
distance of 100 feet from
the paved road with a 6- to
12-inch layer of wood chips
or mulch or 6-inch layer of
gravel.

NOI-1
Construction Noise Best
Management Practices. Prior
to any construction activity,
the construction contractor
(confirmed by the City or a
City appointed noise liaison),
shall equip all construction
equipment, fixed or mobile,
with properly operating and
maintained mufflers,
consistent with
manufacturers’ standards.

Prior to
construction
Construction
Contractor / City noise
liaison
City of West
Sacramento Prior to construction
Implementation of
applicable
construction noise
BMPs
NOI-2
Placement of Stationary
Construction Equipment.

During the course of any
construction activity, the
construction contractor
(confirmed by the City or a
During
construction
Construction
Contractor / City noise
liaison
Construction
Contractor / City
noise liaison
During construction
Implementation of
noise reduction
measures
235
A-9

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
City appointed noise liaison)
shall place all stationary
construction equipment so
that emitted noise is directed
away from sensitive receptors
nearest the project site.

NOI-3
Equipment Staging Areas.

Prior to and during any
construction activity, the
construction contractor
(confirmed by the City or a
City appointed noise liaison)
shall locate equipment staging
in areas that would create the
greatest possible distance
between construction-related
noise sources and noisesensitive receptors nearest
the project.

Prior to
construction
Construction
Contractor / City noise
liaison
Construction
Contractor/ City
noise liaison
Prior to construction
Implementation of
noise reduction
measures
236
A-10

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
NOI-4
Placement of Construction
Equipment Near Sensitive
Receptors. During any
construction activity, the
construction contractor
(confirmed by the City or a
City appointed noise liaison)
shall ensure simultaneous
operation of multiple pieces
of construction equipment
would not occur near noisesensitive receptors. The
construction contractor shall
limit the use of construction
equipment within 20 feet of
noise-sensitive receptors to
one piece of equipment at a
time.

During
construction
Construction
Contractor / City noise
liaison
Construction
Contractor / City
noise liaison
During construction
Implementation of
noise reduction
measures
NOI-5
Noise Construction Hours.

The construction contractor,
through enforcement by the
City, shall ensure that all
general construction-related
activities be restricted to the
daytime hours of 7:00 a.m. to
10:00 p.m., Monday through
Friday. Construction activities
shall be restricted from
occurring on weekends
(Saturday and Sunday) and on
holidays.

Constructionrelated
activities
restricted to the
daytime hours
of 7:00 a.m. to
10:00 p.m.,
Monday
through Friday
City of West
Sacramento/Construct
ion contractor
City of West
Sacramento/
Construction
contractor
Construction-related
activities restricted to
the daytime hours of
7:00 a.m. to 10:00
p.m., Monday through
Friday
Compliance with
allowable
construction hours.
237
A-11

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
NOI-6
Construction Notification to
Sensitive Receptors. Prior to
commencement of
construction activities near
sensitive receptors
(residential units, hotels/
motels, schools), the
construction contractor shall
provide notification to such
sensitive receptors of
construction activities, the
intended length of
occurrence, the potential
occurrence for short term
noise level increases, and
noise liaison contact
information. The notification
can be a flyer provided to the
owners of the sensitive
receptors, in-person
notification, or a flyer
provided to the sensitive
receptors via mail.

Additionally, the City shall
notify sensitive receptors
(residences, hotels/motels,
and schools) prior to specific
operations, which may yield
high noise levels.

Prior to
commencement
of construction
City of West
Sacramento / City
noise liaison /
Construction
contractor
City of West
Sacramento /
City noise liaison
/ Construction
contractor
Prior to
commencement of
construction
Implementation of
noise reduction
measures
238
A-12

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
NOI-7
Construction Noise Liaison.

The City of West Sacramento
(City) shall appoint a
construction noise liaison who
shall be responsible for
responding to any local
complaints about construction
noise. The City shall facilitate
a focus meeting with project
area residents, the
construction contractor, and
the noise liaison to notify
residents of potential impacts
and of measures to reduce
such impacts. If a noise
complaint related to project
construction is received, the
construction noise liaison shall
determine the cause of the
construction noise complaint
(e.g., construction activities
outside of City authorized
times, bad muffler) and shall
determine and implement
reasonable measures
warranted to correct the
problem. Reasonable
measures may include, but
are not limited to:

If a noise
complaint
related to
project
construction is
received
The City of West
Sacramento / City
noise liaison / and
Construction
contractor
The City of West
Sacramento /
City noise liaison
/ Construction
contractor
If a noise complaint
related to project
construction is
received
Implementation of
noise reduction
measures
239
A-13

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
 Construct noise barriers,
such as temporary walls or
piles of excavated material,
between noisy activities
and noise-sensitive
receptors.
 Re-route truck traffic away
from residential streets.

Select streets with the
fewest homes if no
alternatives are available.
 Site equipment on the
construction-site as far
away from noise-sensitive
sites as possible.
 Construct walled
enclosures (shields or
loaded vinyl curtains)
around especially noisy
activities or clusters of
noisy equipment.
 Combine noisy operations
to occur in the same time
period.

NOI-8
Construction Noise Liaison
Spot Checking. The City (or a
City appointed noise liaison)
shall conduct spot-check
short-term noise monitoring
during construction activities
within residential areas to
During
construction
The City of West
Sacramento / Citynoise liaison
The City of West
Sacramento /
City noise liaison
During construction
Implementation of
spot-checking for
short-term noise
monitoring during
construction
activities
240
A-14

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
evaluate noise impacts on
sensitive receptors,
specifically residences located
along the corridor.

NOI-9
Lodging/Accommodations for
High Noise Events Near
Sensitive Receptors. For days
when construction activities
would occur within 500 feet
of an adjacent residence, such
residents may request City
provided lodging, to reduce
construction noise impacts.

Lodging accommodations
shall be at the City’s
discretion. Affected residents
shall request such
accommodations through the
City appointed noise liaison.

When
construction
activities would
occur within
500 feet of an
adjacent
residence
The City of West
Sacramento / Citynoise liaison
The City of West
Sacramento /
City-noise liaison
When construction
activities would occur
within 500 feet of an
adjacent residence
Implementation of
lodging
accommodations
when construction
activities would
occur within 500
feet of an adjacent
residence
BIO-1
Environmentally Sensitive
Area Fencing. The riparian
habitat shall be fully avoided.

Prior to initial ground
disturbance, Environmentally
Sensitive Area (ESA) silt
fencing shall be placed along
the limits of riparian
vegetation to exclude
construction activities from
the avoided area. ESA fencing
shall be maintained until
construction is complete. No
vegetation removal or
Prior to ground
disturbance
Construction
contractor
Qualified
biologist /
Construction
contractor
Prior to ground
disturbance
Installation of ESA
fencing along the
limits of riparian
vegetation prior to
ground disturbance
241
A-15

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
ground-disturbing activities
shall be permitted beyond the
fencing. Vehicles and
equipment shall not be
operated or parked beyond
the fencing. Materials shall
not be stored or staged
beyond or within 25 feet of
the fencing.

BIO-2
Avoidance and Minimization
Measures for Swainson’s
Hawk. The following
measures shall be
implemented to reduce
potential impacts to
Swainson’s hawks. These
measures are consistent with
Avoidance and Minimization
Measure 16, Minimize Take
and Adverse Effects on
Swainson’s Hawk and WhiteTailed Kite in the Yolo HCP/
NCCP:

In accordance with guidance
provided by the Swainson’s
Hawk Technical Advisory
Committee (2000), if work
begins during the nesting
season (March 15 to August
30), an early season
preconstruction survey for
nesting Swainson’s hawks
During the
nesting season
(March 15 to
August 30
Qualified biologist
City of West
Sacramento /
CDFW
During the nesting
season (March 15 to
August 30
Completion of
preconstruction
surveys for
Swainson’s Hawk
and
implementation of
avoidance and
minimization
measures
242
A-16

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
shall be conducted between
January and March in the BSA
and immediate vicinity (an
approximately 1,320-foot
[0.25 mile] radius) by a
qualified biologist when tree
foliage is relatively sparse and
nests are easy to identify. A
second preconstruction
survey for nesting Swainson’s
hawks shall be conducted in
the BSA and immediate
vicinity (an approximately
1,320-foot [0.25 mile] radius)
by a qualified biologist no
more than 15 days prior to
initiation of earthmoving
activities.
 If nesting Swainson’s
hawks are found within the
survey area, a 1,320-foot
(0.25 mile) initial
temporary nest
disturbance buffer shall be
established. If project
activities within the
temporary nest
disturbance buffer are
determined to be
necessary during the
nesting season, a qualified
biologist shall evaluate the
243
A-17

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
potential for the project to
disturb nesting activities.

CDFW shall be contacted to
review the evaluation and
determine if the project
can proceed without
adversely affecting nesting
activities. Work will only be
allowed to proceed within
the temporary nest
disturbance buffer.
 Disturbance of active nests
shall be avoided until it is
determined by a qualified
biologist that nesting is
complete and the young
have fledged, or that the
nest has failed. If work is
allowed to proceed within
the temporary nest
disturbance buffer if
Swainson’s hawks are not
exhibiting agitated
behavior (e.g., defensive
flights at intruders, getting
up from a brooding
position, flying off the nest,
etc.). A qualified biologist
shall be on-site daily while
construction activities are
occurring within the
temporary nest
244
A-18

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
disturbance buffer to
monitor nesting activity.

The monitor shall have the
authority to stop work if it
is determined the project is
adversely affecting nesting
activities.

BIO-3
Avoidance and Minimization
Measures for the Western
Burrowing Owl. The following
measures shall be
implemented to reduce
potential impacts to western
burrowing owls. These
measures are consistent with
Avoidance and Minimization
Measure 18, Minimize Take
and Adverse Effects on
Western Burrowing Owl in the
Yolo HCP/NCCP:
 Preconstruction surveys for
western burrowing owls
shall be conducted by a
qualified biologist in
accordance with the
CDFW’s 2012 Staff Report
on Burrowing Owl
Mitigation and shall occur
no more than 3 days prior
to the start of ground
disturbing activities in
areas having suitable
Prior to
construction Qualified biologist
City of West
Sacramento /
Qualified
biologist/CDFW
Prior to construction
Completion of
preconstruction
surveys for
burrowing owls
245
A-19

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
burrows. Time lapses
between ground disturbing
activities will trigger
subsequent surveys prior
to ground disturbance.
 If burrowing owls are
identified during the nonbreeding season, passive
exclusion shall be
implemented during the
per CDFW’s 2012 Staff
Report on Burrowing Owl
Mitigation. This may
include the installation of
one-way doors in burrow
entrances by a qualified
biologist.
 If any occupied burrows
are identified during the
breeding season (February
1 to August 31), the active
burrow shall be avoided
within a set disturbance
buffer consistent with the
2012 Staff Report on
Burrowing Owl Mitigation
during the remainder of
the breeding season or
while the nest is occupied.

Construction may occur
inside of the disturbance
buffer if an avoidance and
246
A-20

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
minimization plan is
approved by the Yolo
Habitat Conservancy and
CDFW prior to project
construction and contains
the following criteria:
o A qualified biologist
monitors the owls for a
minimum of 3 days prior
to construction to
determine baseline
nesting and foraging
behavior.
o The same qualified
biologist monitors the
owls during
construction and finds
no change in owl
nesting and foraging
behavior in response to
construction activities.
o If the qualified biologist
identifies a change in
owl nesting behavior as
a result of construction
activities, the qualified
biologist shall have the
authority to stop work
within the disturbance
buffer. This information
shall be reported to the
Yolo Habitat
247
A-21

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
Conservancy and CDFW
within 24 hours.

Construction shall not
resume during the
remainder of the
breeding season or
while the nest is
occupied.
o If monitoring indicates
that the nest has been
abandoned prior to the
end of besting season,
the project proponent
may remove the
disturbance buffer with
the concurrence of
CDFW.

CUL-1
Archeological Monitoring
Protocol. While the APE, as
currently designed, has low
potential for intact
archaeological resources, the
surrounding area has high
archaeological sensitivity.

Accordingly, in the event that
plans change such that ground
disturbance may exceed
depth of fill, an archaeologist
will monitor all grounddisturbing activities extending into in situ soils.

During grounddisturbing
activities
Archaeologist Archaeologist During grounddisturbing activities Completion of
archaeological
monitoring during
ground-disturbing
activities
248
A-22

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
CUL-2
Environmental Awareness
Program (WEAP) Training.

Although it appears that the
project excavations will not
extend into previously
undisturbed soil, there is
some potential for non-in situ
cultural resources to be
present in the levee and
railroad grade fill that may be
of local interest. For this
reason, Worker’s
Environmental Awareness
Program (WEAP) training is
recommended.

Prior to grounddisturbing
activities
City of West
Sacramento /
Construction
contractor /
Archaeologist
City of West
Sacramento /
Construction
contractor /
Archaeologist
Prior to grounddisturbing activities
Implementation
and completion of
Worker’s
Environmental
Awareness Program
(WEAP)
CUL-3
Inadvertent Discovery of
Archaeological Deposits. If
deposits of pre-contact or
historic-period archaeological
materials are encountered
during project activities, all
work within 50 feet of the
discovery shall be redirected.

The qualified archaeologist
should assess the situation,
immediately notify the Corps,
consult with agencies as
appropriate, and make
recommendations for the
treatment of the discovery.

Project personnel should not
collect or move any
During grounddisturbing
activities
City of West
Sacramento. U.S.

Army Corps of
Engineers/Archaeologi
st
Archaeologist During grounddisturbing activities
Compliance with
Ttile 36 CFR Section
800.13(b)(3) in the
event that
archaeological
deposits are
encountered
249
A-23

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
archaeological materials.

Archaeological materials can
include flaked-stone tools
(e.g., projectile points, knives,
and choppers) or obsidian,
chert, basalt, or quartzite
toolmaking debris; bone tools;
culturally darkened soil (i.e.,
midden soil often containing
heat-affected rock, ash and
charcoal, shellfish remains,
bones, and other cultural
materials); and stone-milling
equipment (e.g., mortars,
pestles, and handstones). Precontact archaeological sites often contain human remains.

Historic-period materials can
include wood, stone,
concrete, or adobe footings,
walls, and other structural
remains; debris-filled wells or
privies; and deposits of wood,
glass, ceramics, metal, and
other refuse. It is
recommended that impacts to
archaeological cultural
resources be avoided by
project activities. Should an
unanticipated archaeological
deposit be encountered
during ground disturbance in
the APE, all ground-disturbing
250
A-24

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
activities within 50 feet should
be redirected, and protective
fencing should be placed to
ensure the area is not
inadvertently impacted by
construction activities. The
City shall, in consultation with
the Corps and local California
tribal groups, make
reasonable effort to avoid or
minimize adverse effects and
follow the procedures as
specified in 36 CFR Section
800.13(b)(3). If treatment is
required, a plan should be
developed in consultation
with the Corps to mitigate,
avoid, or minimize impacts to
cultural resources.

Treatments may consist of,
but are not necessarily limited
to, systematic recovery and
analysis of archaeological
deposits; recording the
resource; preparation of a
report of findings;
accessioning recovered
archaeological materials at an
appropriate curation facility;
and community outreach. All
reports produced as part of
the evaluation and treatment
of cultural resources
251
A-25

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
identified during the project
shall be submitted to the City
and Corps for review and
comment. All final documents
should be submitted to the
NWIC.

CUL-4
Accidental Discovery of
Human Remains. In the event
that human remains are
encountered at any time
during project work, State
Health and Safety Code
Section 7050.5 states that no
further disturbance shall
occur until the County
Medical Examiner and
Coroner has decided origin
and disposition pursuant to
PRC Section 5097.98. The
County Medical Examiner and
Coroner must be notified of
the find immediately. If the
remains are determined to be
Native American, the County
Medical Examiner and
Coroner would notify the
NAHC within 24 hours. The
NAHC would determine and
notify a Most Likely
Descendent (MLD) per PRC
5097.98. With the permission
of the landowner or his/her
Prior to and
during grounddisturbing
activities
County, City of West
Sacramento /
Construction
Contractor /
Archaeologist
Construction
Contractor /
Archaeologist
Prior to and during
ground-disturbing
activities
Compliance with
PRC Section 7050.5
in the event that
human remains are
encountered
252
A-26

MITIGATION MONITORING AND REPORTING P ROGRAM
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\Attachments\Attachment A MMRP.docx (12/11/24) Southport Levee Recreation Trail Project Mitigation Monitoring and Reporting Program Mitigation
Measure/
Regulatory
Compliance
Measure
Avoidance and Minimization
Measure Timing Implementing Party Monitoring Party
Frequency and
Duration of
Monitoring
Performance
Criteria
authorized representative, the
MLD may inspect the site of
the discovery. The MLD shall
complete the inspection and
make recommendations or
preferences for treatment
within 48 hours of being
granted access to the site. The
MLD’s recommendations may
include scientific removal and
nondestructive analysis of
human remains and items
associated with Native
American burials,
preservation of Native
American human remains and
associated items in place,
relinquishment of Native
American human remains and
associated items to the
descendants for treatment, or
any other culturally
appropriate treatment.
253

A DDENDUM TO THE S OUTHPORT S ACRAMENTO RIVER E ARLY

I MPLEMENTATION P ROJECT
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

CITY OF WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx (12/11/24)

ATTACHMENT B

CALEEMOD WORKSHEETS
254
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 1 / 22
South Levee Recreation Trail (SLRT) Custom Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds

2.2. Construction Emissions by Year, Unmitigated

3. Construction Emissions Details

3.1. Linear, Grubbing & Land Clearing (2025) - Unmitigated

3.3. Linear, Grading & Excavation (2025) - Unmitigated

3.5. Linear, Grading & Excavation (2026) - Unmitigated

3.7. Linear, Drainage, Utilities, & Sub-Grade (2026) - Unmitigated

3.9. Linear, Paving (2026) - Unmitigated

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type
255
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 2 / 22

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated

5. Activity Data

5.1. Construction Schedule

5.2. Off-Road Equipment

5.2.1. Unmitigated

5.3. Construction Vehicles

5.3.1. Unmitigated

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies

5.5. Architectural Coatings

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities

5.6.2. Construction Earthmoving Control Strategies

5.7. Construction Paving

5.8. Construction Electricity Consumption and Emissions Factors

5.18. Vegetation 256
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 3 / 22

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

8. User Changes to Default Data
257
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 4 / 22

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name South Levee Recreation Trail (SLRT)
Construction Start Date 8/4/2025
Lead Agency —
Land Use Scale Plan/community
Analysis Level for Defaults County
Windspeed (m/s) 3.00
Precipitation (days) 6.00
Location 38.532866219225724, -121.53355942475784
County Yolo
City West Sacramento
Air District Yolo/Solano AQMD
Air Basin Sacramento Valley
TAZ 336
EDFZ 4
Electric Utility Pacific Gas & Electric Company
Gas Utility Pacific Gas & Electric
App Version 2022.1.1.28

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Road Construction 5.90 Mile 11.3 0.00 0.00 — — —
258
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 5 / 22

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.1. Construction Emissions Compared Against Thresholds Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Unmit. 1.76 49.7 41.0 0.06 1.58 76.6 78.2 1.45 7.73 9.18 — 7,230 7,230 0.28 0.09 7,266 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Unmit. 1.73 49.8 40.2 0.06 1.58 76.6 78.2 1.45 7.73 9.18 — 7,160 7,160 0.28 0.09 7,194 Average
Daily
(Max)
— — — — — — — — — — — — — — — —
Unmit. 0.53 15.1 12.1 0.02 0.47 27.5 28.0 0.43 2.78 3.21 — 2,237 2,237 0.09 0.03 2,247 Annual
(Max)
— — — — — — — — — — — — — — — —
Unmit. 0.10 2.76 2.22 < 0.005 0.09 5.02 5.11 0.08 0.51 0.59 — 370 370 0.01 < 0.005 372

2.2. Construction Emissions by Year, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Year ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Daily -
Summer
(Max)
— — — — — — — — — — — — — — — —
2025 1.76 49.7 41.0 0.06 1.58 76.6 78.2 1.45 7.73 9.18 — 7,230 7,230 0.28 0.09 7,266 259 South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 6 / 22
2026 1.39 41.6 33.4 0.05 1.21 67.8 69.0 1.10 6.84 7.95 — 6,276 6,276 0.24 0.07 6,304 Daily -
Winter
(Max)
— — — — — — — — — — — — — — — —
2025 1.73 49.8 40.2 0.06 1.58 76.6 78.2 1.45 7.73 9.18 — 7,160 7,160 0.28 0.09 7,194 2026 1.72 49.8 40.0 0.06 1.58 76.6 78.2 1.45 7.73 9.18 — 7,147 7,147 0.28 0.09 7,180 Average
Daily
— — — — — — — — — — — — — — — —
2025 0.40 11.3 9.24 0.01 0.36 19.6 19.9 0.33 1.98 2.31 — 1,646 1,646 0.06 0.02 1,654 2026 0.53 15.1 12.1 0.02 0.47 27.5 28.0 0.43 2.78 3.21 — 2,237 2,237 0.09 0.03 2,247 Annual — — — — — — — — — — — — — — — —
2025 0.07 2.06 1.69 < 0.005 0.07 3.57 3.64 0.06 0.36 0.42 — 272 272 0.01 < 0.005 274 2026 0.10 2.76 2.22 < 0.005 0.09 5.02 5.11 0.08 0.51 0.59 — 370 370 0.01 < 0.005 372

3. Construction Emissions Details

3.1. Linear, Grubbing & Land Clearing (2025) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Onsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.17 4.25 3.43 < 0.005 0.19 — 0.19 0.18 — 0.18 — 490 490 0.02 < 0.005 492 Dust
From
Material
Movement
— — — — — 0.21 0.21 — 0.02 0.02 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 260
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 7 / 22
Daily, — — — — — — — — — — — — — — — —
Winter
(Max)
Average
Daily
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.01 0.30 0.24 < 0.005 0.01 — 0.01 0.01 — 0.01 — 34.9 34.9 < 0.005 < 0.005 35.0 Dust
From
Material
Movement
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Off-Road
Equipment
< 0.005 0.06 0.04 < 0.005 < 0.005 — < 0.005 < 0.005 — < 0.005 — 5.78 5.78 < 0.005 < 0.005 5.80 Dust
From
Material
Movement
— — — — — < 0.005 < 0.005 — < 0.005 < 0.005 — — — — — — Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Worker 0.14 0.09 1.95 0.00 0.00 41.4 41.4 0.00 4.17 4.17 — 367 367 0.01 0.01 373 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.11 0.00 0.00 2.90 2.90 0.00261 0.29 0.29 — 23.9 23.9 < 0.005 < 0.005 24.3 South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 8 / 22
Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.02 0.00 0.00 0.53 0.53 0.00 0.05 0.05 — 3.96 3.96 < 0.005 < 0.005 4.02 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00

3.3. Linear, Grading & Excavation (2025) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Onsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

1.51 49.5 37.5 0.06 1.58 — 1.58 1.45 — 1.45 — 6,496 6,496 0.26 0.05 6,518 Dust
From
Material
Movement
— — — — — 1.24 1.24 — 0.13 0.13 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

1.51 49.5 37.5 0.06 1.58 — 1.58 1.45 — 1.45 — 6,496 6,496 0.26 0.05 6,518 Dust
From
Material
Movement
— — — — — 1.24 1.24 — 0.13 0.13 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 262
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 9 / 22
Average
Daily
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.33 10.9 8.30 0.01 0.35 — 0.35 0.32 — 0.32 — 1,436 1,436 0.06 0.01 1,441 Dust
From
Material
Movement
— — — — — 0.27 0.27 — 0.03 0.03 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.06 2.00 1.52 < 0.005 0.06 — 0.06 0.06 — 0.06 — 238 238 0.01 < 0.005 239 Dust
From
Material
Movement
— — — — — 0.05 0.05 — 0.01 0.01 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Worker 0.24 0.17 3.45 0.00 0.00 73.2 73.2 0.00 7.37 7.37 — 650 650 0.01 0.02 659 Vendor < 0.005 0.03 0.01 < 0.005 < 0.005 0.78 0.78 < 0.005 0.08 0.08 — 27.6 27.6 < 0.005 < 0.005 29.0 Hauling < 0.005 0.07 0.02 < 0.005 < 0.005 1.41 1.41 < 0.005 0.14 0.14 — 56.1 56.1 < 0.005 0.01 58.9 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Worker 0.22 0.23 2.58 0.00 0.00 73.2 73.2 0.00 7.37 7.37 — 579 579 0.01 0.02 587 Vendor < 0.005 0.04 0.01 < 0.005 < 0.005 0.78 0.78 < 0.005 0.08 0.08 — 27.6 27.6 < 0.005 < 0.005 28.9 Hauling < 0.005 0.07 0.02 < 0.005 < 0.005 1.41 1.41 < 0.005 0.14 0.14 — 56.1 56.1 < 0.005 0.01 58.8 Average
Daily
— — — — — — — — — — — — — — — —
263
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 10 / 22
Worker 0.05 0.04 0.58 0.00 0.00 15.9 15.9 0.00 1.60 1.60 — 131 131 < 0.005 0.01 133 Vendor < 0.005 0.01 < 0.005 < 0.005 < 0.005 0.17 0.17 < 0.005 0.02 0.02 — 6.11 6.11 < 0.005 < 0.005 6.40 Hauling < 0.005 0.02 0.01 < 0.005 < 0.005 0.31 0.31 < 0.005 0.03 0.03 — 12.4 12.4 < 0.005 < 0.005 13.0 Annual — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.11 0.00 0.00 2.90 2.90 0.00 0.29 0.29 — 21.8 21.8 < 0.005 < 0.005 22.1 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.03 0.03 < 0.005 < 0.005 < 0.005 — 1.01 1.01 < 0.005 < 0.005 1.06 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.06 0.06 < 0.005 0.01 0.01 — 2.05 2.05 < 0.005 < 0.005 2.16

3.5. Linear, Grading & Excavation (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Onsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

1.51 49.5 37.5 0.06 1.58 — 1.58 1.45 — 1.45 — 6,495 6,495 0.26 0.05 6,517 Dust
From
Material
Movement
— — — — — 1.24 1.24 — 0.13 0.13 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.10 3.19 2.42 < 0.005 0.10 — 0.10 0.09 — 0.09 — 419 419 0.02 < 0.005 421 264
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 11 / 22
Dust — — — — — 0.08 0.08 — 0.01 0.01 — — — — — —
From
Material
Movement
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.02 0.58 0.44 < 0.005 0.02 — 0.02 0.02 — 0.02 — 69.4 69.4 < 0.005 < 0.005 69.7 Dust
From
Material
Movement
— — — — — 0.01 0.01 — < 0.005 < 0.005 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Worker 0.21 0.21 2.41 0.00 0.00 73.2 73.2 0.00 7.37 7.37 — 569 569 0.01 0.02 576 Vendor < 0.005 0.04 0.01 < 0.005 < 0.005 0.78 0.78 < 0.005 0.08 0.08 — 27.2 27.2 < 0.005 < 0.005 28.5 Hauling < 0.005 0.07 0.02 < 0.005 < 0.005 1.41 1.41 < 0.005 0.14 0.14 — 55.0 55.0 < 0.005 0.01 57.8 Average
Daily
— — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.16 0.00 0.00 4.65 4.65 0.00 0.47 0.47 — 37.7 37.7 < 0.005 < 0.005 38.2 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.05 0.05 < 0.005 0.01 0.01 — 1.75 1.75 < 0.005 < 0.005 1.84 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.09 0.09 < 0.005 0.01 0.01 — 3.55 3.55 < 0.005 < 0.005 3.73 Annual — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.03 0.00 0.00 0.85 0.85 0.00 0.09 0.09 — 6.23 6.23 < 0.005 < 0.005 6.32 Vendor < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.01 0.01 < 0.005 < 0.005 < 0.005 — 0.29 0.29 < 0.005 < 0.005 0.30 Hauling < 0.005 < 0.005 < 0.005 < 0.005 < 0.005 0.02 0.02 < 0.005 < 0.005 < 0.005 — 0.59 0.59 < 0.005 < 0.005 0.62 265
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 12 / 22

3.7. Linear, Drainage, Utilities, & Sub-Grade (2026) - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Onsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

1.18 41.5 30.4 0.05 1.21 — 1.21 1.10 — 1.10 — 5,693 5,693 0.23 0.05 5,712 Dust
From
Material
Movement
— — — — — 1.03 1.03 — 0.11 0.11 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

1.18 41.5 30.4 0.05 1.21 — 1.21 1.10 — 1.10 — 5,693 5,693 0.23 0.05 5,712 Dust
From
Material
Movement
— — — — — 1.03 1.03 — 0.11 0.11 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.29 10.3 7.59 0.01 0.30 — 0.30 0.27 — 0.27 — 1,419 1,419 0.06 0.01 1,424 Dust
From
Material
Movement
— — — — — 0.26 0.26 — 0.03 0.03 — — — — — —
266
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 13 / 22
Onsite 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 truck
Annual — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.05 1.89 1.38 < 0.005 0.05 — 0.05 0.05 — 0.05 — 235 235 0.01 < 0.005 236 Dust
From
Material
Movement
— — — — — 0.05 0.05 — 0.01 0.01 — — — — — —
Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Worker 0.21 0.13 2.94 0.00 0.00 66.8 66.8 0.00 6.73 6.73 — 582 582 0.01 0.02 590 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Worker 0.19 0.19 2.20 0.00 0.00 66.8 66.8 0.00 6.73 6.73 — 519 519 0.01 0.02 526 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Average
Daily
— — — — — — — — — — — — — — — —
Worker 0.05 0.04 0.56 0.00 0.00 16.4 16.4 0.00 1.65 1.65 — 133 133 < 0.005 0.01 135 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Worker 0.01 0.01 0.10 0.00 0.00 2.99 2.99 0.00 0.30 0.30 — 22.0 22.0 < 0.005 < 0.005 22.3 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 267 South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 14 / 22
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00

3.9. Linear, Paving (2026) - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Location ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Onsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.54 14.1 11.3 0.01 0.63 — 0.63 0.60 — 0.60 — 1,619 1,619 0.07 0.01 1,625 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — —
Off-Road
Equipment

0.06 1.51 1.21 < 0.005 0.07 — 0.07 0.06 — 0.06 — 173 173 0.01 < 0.005 174 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Off-Road
Equipment

0.01 0.27 0.22 < 0.005 0.01 — 0.01 0.01 — 0.01 — 28.6 28.6 < 0.005 < 0.005 28.7 Onsite
truck

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Offsite — — — — — — — — — — — — — — — —
Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Worker 0.18 0.11 2.52 0.00 0.00 57.3 57.3 0.00 5.77 5.77 — 499 499 0.01 0.02 506 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 268 South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 15 / 22
Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Average
Daily
— — — — — — — — — — — — — — — —
Worker 0.02 0.02 0.21 0.00 0.00 6.02 6.02 0.00 0.61 0.61 — 48.8 48.8 < 0.005 < 0.005 49.4 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Annual — — — — — — — — — — — — — — — —
Worker < 0.005 < 0.005 0.04 0.00 0.00 1.10 1.10 0.00 0.11 0.11 — 8.07 8.07 < 0.005 < 0.005 8.19 Vendor 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00 Hauling 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 — 0.00 0.00 0.00 0.00 0.00

4. Operations Emissions Details

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — —
Annual — — — — — — — — 269 — — — — — — — —
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 16 / 22
Total — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land Use ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — —
270
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 17 / 22
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
Sequeste
red
— — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
Removed — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — —

5. Activity Data

5.1. Construction Schedule
Phase Name Phase Type Start Date End Date Days Per Week Work Days per Phase Phase Description Linear, Grubbing & Land
Clearing
Linear, Grubbing & Land
Clearing
8/4/2025 9/9/2025 5.00 26.0 —
Linear, Grading &
Excavation
Linear, Grading &
Excavation
9/10/2025 2/2/2026 5.00 104 —
271
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 18 / 22
Linear, Drainage, Utilities, 2/3/2026 6/10/2026 5.00 91.0 — & Sub-Grade
Linear, Drainage, Utilities,
& Sub-Grade
Linear, Paving Linear, Paving 6/11/2026 8/4/2026 5.00 39.0 —

5.2. Off-Road Equipment

5.2.1. Unmitigated
Phase Name Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor Linear, Grubbing &
Land Clearing
Crawler Tractors Diesel Tier 2 1.00 8.00 87.0 0.43
Linear, Grubbing &
Land Clearing
Excavators Diesel Tier 2 1.00 8.00 36.0 0.38
Linear, Grubbing &
Land Clearing
Signal Boards Electric Average 11.0 8.00 6.00 0.82
Linear, Grading &
Excavation
Crawler Tractors Diesel Tier 2 1.00 8.00 87.0 0.43
Linear, Grading &
Excavation
Excavators Diesel Tier 2 3.00 8.00 36.0 0.38
Linear, Grading &
Excavation
Graders Diesel Tier 2 1.00 8.00 148 0.41
Linear, Grading &
Excavation
Rollers Diesel Tier 2 2.00 8.00 36.0 0.38
Linear, Grading &
Excavation
Rubber Tired Loaders Diesel Tier 2 1.00 8.00 150 0.36
Linear, Grading &
Excavation
Scrapers Diesel Tier 2 2.00 8.00 423 0.48
Linear, Grading &
Excavation
Signal Boards Electric Average 11.0 8.00 6.00 0.82
Linear, Grading &
Excavation
Tractors/Loaders/Back
hoes
Diesel Tier 2 2.00 8.00 84.0 0.37
Linear, Drainage,
Utilities, & Sub-Grade
Air Compressors Diesel Tier 2 1.00 8.00 37.0 0.48
272
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 19 / 22
Linear, Drainage, Generator Sets Diesel Tier 2 1.00 8.00 14.0 0.74 Utilities, & Sub-Grade
Linear, Drainage,
Utilities, & Sub-Grade
Graders Diesel Tier 2 1.00 8.00 148 0.41
Linear, Drainage,
Utilities, & Sub-Grade
Plate Compactors Diesel Tier 2 1.00 8.00 8.00 0.43
Linear, Drainage,
Utilities, & Sub-Grade
Pumps Diesel Tier 2 1.00 8.00 11.0 0.74
Linear, Drainage,
Utilities, & Sub-Grade
Rough Terrain Forklifts Diesel Tier 2 1.00 8.00 96.0 0.40 Linear, Drainage,
Utilities, & Sub-Grade
Scrapers Diesel Tier 2 2.00 8.00 423 0.48
Linear, Drainage,
Utilities, & Sub-Grade
Signal Boards Electric Average 11.0 8.00 6.00 0.82
Linear, Drainage,
Utilities, & Sub-Grade
Tractors/Loaders/Back
hoes
Diesel Tier 2 2.00 8.00 84.0 0.37
Linear, Paving Pavers Diesel Tier 2 1.00 8.00 81.0 0.42 Linear, Paving Paving Equipment Diesel Tier 2 1.00 8.00 89.0 0.36 Linear, Paving Rollers Diesel Tier 2 3.00 8.00 36.0 0.38 Linear, Paving Signal Boards Electric Average 11.0 8.00 6.00 0.82 Linear, Paving Tractors/Loaders/Back
hoes
Diesel Tier 2 2.00 8.00 84.0 0.37

5.3. Construction Vehicles

5.3.1. Unmitigated
Phase Name Trip Type One-Way Trips per Day Miles per Trip Vehicle Mix Linear, Grubbing & Land Clearing — — — —
Linear, Grubbing & Land Clearing Worker 32.5 14.3 LDA,LDT1,LDT2 Linear, Grubbing & Land Clearing Vendor 0.00 8.80 HHDT,MHDT Linear, Grubbing & Land Clearing Hauling 0.00 20.0 HHDT Linear, Grubbing & Land Clearing Onsite truck — — HHDT
273
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 20 / 22
Linear, Grading & Excavation — — — —
Linear, Grading & Excavation Worker 57.5 14.3 LDA,LDT1,LDT2 Linear, Grading & Excavation Vendor 1.00 8.80 HHDT,MHDT Linear, Grading & Excavation Hauling 0.79 20.0 HHDT
Linear, Grading & Excavation Onsite truck — — HHDT
Linear, Drainage, Utilities, &
Sub-Grade
— — — —
Linear, Drainage, Utilities, &
Sub-Grade
Worker 52.5 14.3 LDA,LDT1,LDT2
Linear, Drainage, Utilities, &
Sub-Grade
Vendor 0.00 8.80 HHDT,MHDT
Linear, Drainage, Utilities, &
Sub-Grade
Hauling 0.00 20.0 HHDT
Linear, Drainage, Utilities, &
Sub-Grade
Onsite truck — — HHDT
Linear, Paving — — — —
Linear, Paving Worker 45.0 14.3 LDA,LDT1,LDT2
Linear, Paving Vendor 0.00 8.80 HHDT,MHDT
Linear, Paving Hauling 0.00 20.0 HHDT
Linear, Paving Onsite truck — — HHDT

5.4. Vehicles

5.4.1. Construction Vehicle Control Strategies
Control Strategies Applied PM10 Reduction PM2.5 Reduction Water unpaved roads twice daily 55% 55%
Limit vehicle speeds on unpaved roads to 25 mph 44% 44% Sweep paved roads once per month 9% 9%

5.5. Architectural Coatings 274
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 21 / 22
Phase Name Residential Interior Area
Coated (sq ft)
Residential Exterior Area
Coated (sq ft)
Non-Residential Interior Area
Coated (sq ft)
Non-Residential Exterior Area
Coated (sq ft)
Parking Area Coated (sq ft)

5.6. Dust Mitigation

5.6.1. Construction Earthmoving Activities
Phase Name Material Imported (cy) Material Exported (cy) Acres Graded (acres) Material Demolished (sq. ft.) Acres Paved (acres) Linear, Grubbing & Land
Clearing
— — 11.3 0.00 —
Linear, Grading & Excavation 650 — 11.3 0.00 —
Linear, Drainage, Utilities, &
Sub-Grade
— — 11.3 0.00 —

5.6.2. Construction Earthmoving Control Strategies
Control Strategies Applied Frequency (per day) PM10 Reduction PM2.5 Reduction Water Exposed Area 2 61% 61%

5.7. Construction Paving
Land Use Area Paved (acres) % Asphalt
Road Construction 11.3 100%

5.8. Construction Electricity Consumption and Emissions Factors kWh per Year and Emission Factor (lb/MWh)
Year kWh per Year CO2 CH4 N2O
2025 646 204 0.03 < 0.005
2026 969 204 0.03 < 0.005
275
South Levee Recreation Trail (SLRT) Custom Report, 9/26/2024 22 / 22

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

8. User Changes to Default Data
Screen Justification
Construction: Off-Road Equipment Anticipated construction equipment associated with the proposed project includes asphalt pavers, backhoe loaders, compactors, skid steer/multi-terrain loaders, transport trucks, and cement mixer trucks. Assuming the use of Tier 2 construction equipment. 276

A DDENDUM TO THE S OUTHPORT S ACRAMENTO RIVER E ARLY

I MPLEMENTATION P ROJECT
DECEMBER 2024

SOUTHPORT L EVEE RECREATION T RAIL P ROJECT

CITY OF WEST S ACRAMENTO , C ALIFORNIA
P:\M-S\MKT2203 Southport West Sac Levee Trail\PRODUCTS\Addendum\CEQA Addendum 12112024.docx (12/11/24)

ATTACHMENT C

CNDDB AND IPAC RECORD SEARCHES
277
Species Element Code Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
Accipiter cooperii
Cooper's hawk
ABNKC12040 None None G5 S4 WL
Acipenser medirostris pop. 1
green sturgeon - southern DPS
AFCAA01031 Threatened None G2T1 S1 SSC
Actinemys marmorata
northwestern pond turtle
ARAAD02031 Proposed
Threatened
None G2 SNR SSC
Agelaius tricolor
tricolored blackbird
ABPBXB0020 None Threatened G1G2 S2 SSC
Ammodramus savannarum
grasshopper sparrow
ABPBXA0020 None None G5 S3 SSC
Antrozous pallidus
pallid bat
AMACC10010 None None G4 S3 SSC
Archoplites interruptus
Sacramento perch
AFCQB07010 None None G1 S1 SSC
Ardea alba
great egret
ABNGA04040 None None G5 S4
Ardea herodias
great blue heron
ABNGA04010 None None G5 S4
Astragalus tener var. ferrisiae
Ferris' milk-vetch
PDFAB0F8R3 None None G2T1 S1 1B.1
Astragalus tener var. tener
alkali milk-vetch
PDFAB0F8R1 None None G2T1 S1 1B.2
Athene cunicularia
burrowing owl
ABNSB10010 None None G4 S2 SSC
Atriplex cordulata var. cordulata
heartscale
PDCHE040B0 None None G3T2 S2 1B.2
Atriplex depressa
brittlescale
PDCHE042L0 None None G2 S2 1B.2
Bombus crotchii
Crotch's bumble bee
IIHYM24480 None Candidate
Endangered
G2 S2
Bombus occidentalis
western bumble bee
IIHYM24252 None Candidate
Endangered
G3 S1
Bombus pensylvanicus
American bumble bee
IIHYM24260 None None G3G4 S2
Branchinecta conservatio
Conservancy fairy shrimp
ICBRA03010 Endangered None G2 S2
Quad<span style='color:Red'> IS </span>(Sacramento West (3812155)<span style='color:Red'> OR </span>Sacramento East (3812154)<span style='color:Red'> OR </span>Taylor Monument (3812165)<span style='color:Red'> OR </span>Rio Linda (3812164)<span style='color:Red'> OR </span>Grays Bend (3812166)<span style='color:Red'> OR </span>Davis (3812156)<span style='color:Red'> OR </span>Saxon (3812146)<span style='color:Red'> OR </span>Clarksburg (3812145)<span style='color:Red'> OR </span>Florin (3812144))
Query Criteria:

Report Printed on Friday, September 27, 2024
Commercial Version -- Dated September, 1 2024 -- Biogeographic Data Branch Page 1 of 4 Information Expires 3/1/2025
Selected Elements by Scientific Name
California Department of Fish and Wildlife
California Natural Diversity Database
278
Species Element Code Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
Branchinecta lynchi
vernal pool fairy shrimp
ICBRA03030 Threatened None G3 S3
Branchinecta mesovallensis
midvalley fairy shrimp
ICBRA03150 None None G2 S2S3
Buteo regalis
ferruginous hawk
ABNKC19120 None None G4 S3S4 WL
Buteo swainsoni
Swainson's hawk
ABNKC19070 None Threatened G5 S4
Carex comosa
bristly sedge
PMCYP032Y0 None None G5 S2 2B.1
Centromadia parryi ssp. parryi
pappose tarplant
PDAST4R0P2 None None G3T2 S2 1B.2
Charadrius montanus
mountain plover
ABNNB03100 None None G3 S2 SSC
Charadrius nivosus nivosus
western snowy plover
ABNNB03031 Threatened None G3T3 S3 SSC
Chloropyron palmatum
palmate-bracted bird's-beak
PDSCR0J0J0 Endangered Endangered G1 S1 1B.1
Cicindela hirticollis abrupta
Sacramento Valley tiger beetle
IICOL02106 None None G5TH SH
Coccyzus americanus occidentalis
western yellow-billed cuckoo
ABNRB02022 Threatened Endangered G5T2T3 S1
Cuscuta obtusiflora var. glandulosa
Peruvian dodder
PDCUS01111 None None G5T4? SH 2B.2
Desmocerus californicus dimorphus
valley elderberry longhorn beetle
IICOL48011 Threatened None G3T3 S3
Downingia pusilla
dwarf downingia
PDCAM060C0 None None GU S2 2B.2
Egretta thula
snowy egret
ABNGA06030 None None G5 S4
Elanus leucurus
white-tailed kite
ABNKC06010 None None G5 S3S4 FP
Elderberry Savanna
Elderberry Savanna
CTT63440CA None None G2 S2.1
Eryngium jepsonii
Jepson's coyote-thistle
PDAPI0Z130 None None G2 S2 1B.2
Extriplex joaquinana
San Joaquin spearscale
PDCHE041F3 None None G2 S2 1B.2
Falco columbarius
merlin
ABNKD06030 None None G5 S3S4 WL
Fritillaria agrestis
stinkbells
PMLIL0V010 None None G3 S3 4.2
Report Printed on Friday, September 27, 2024
Commercial Version -- Dated September, 1 2024 -- Biogeographic Data Branch Page 2 of 4 Information Expires 3/1/2025
Selected Elements by Scientific Name
California Department of Fish and Wildlife
California Natural Diversity Database
279
Species Element Code Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
Gonidea angulata
western ridged mussel
IMBIV19010 None None G3 S2
Gratiola heterosepala
Boggs Lake hedge-hyssop
PDSCR0R060 None Endangered G2 S2 1B.2
Great Valley Cottonwood Riparian Forest
Great Valley Cottonwood Riparian Forest
CTT61410CA None None G2 S2.1
Hibiscus lasiocarpos var. occidentalis
woolly rose-mallow
PDMAL0H0R3 None None G5T3 S3 1B.2
Hypomesus transpacificus
Delta smelt
AFCHB01040 Threatened Endangered G1 S1
Lasionycteris noctivagans
silver-haired bat
AMACC02010 None None G3G4 S3S4
Lasiurus cinereus
hoary bat
AMACC05032 None None G3G4 S4
Lasthenia chrysantha
alkali-sink goldfields
PDAST5L030 None None G2 S2 1B.1
Laterallus jamaicensis coturniculus
California black rail
ABNME03041 None Threatened G3T1 S2 FP
Legenere limosa
legenere
PDCAM0C010 None None G2 S2 1B.1
Lepidium latipes var. heckardii
Heckard's pepper-grass
PDBRA1M0K1 None None G4T1 S1 1B.2
Lepidurus packardi
vernal pool tadpole shrimp
ICBRA10010 Endangered None G3 S3
Lilaeopsis masonii
Mason's lilaeopsis
PDAPI19030 None Rare G2 S2 1B.1
Linderiella occidentalis
California linderiella
ICBRA06010 None None G2G3 S2S3
Melospiza melodia pop. 1
song sparrow ("Modesto" population)
ABPBXA3013 None None G5T3?Q S3? SSC
Myrmosula pacifica
Antioch multilid wasp
IIHYM15010 None None GH SH
Nannopterum auritum
double-crested cormorant
ABNFD01020 None None G5 S4 WL
Navarretia leucocephala ssp. bakeri
Baker's navarretia
PDPLM0C0E1 None None G4T2 S2 1B.1
Neostapfia colusana
Colusa grass
PMPOA4C010 Threatened Endangered G1 S1 1B.1
Northern Claypan Vernal Pool
Northern Claypan Vernal Pool
CTT44120CA None None G1 S1.1
Northern Hardpan Vernal Pool
Northern Hardpan Vernal Pool
CTT44110CA None None G3 S3.1
Report Printed on Friday, September 27, 2024
Commercial Version -- Dated September, 1 2024 -- Biogeographic Data Branch Page 3 of 4 Information Expires 3/1/2025
Selected Elements by Scientific Name
California Department of Fish and Wildlife
California Natural Diversity Database
280
Species Element Code Federal Status State Status Global Rank State Rank Rare Plant
Rank/CDFW
SSC or FP
Nycticorax nycticorax
black-crowned night heron
ABNGA11010 None None G5 S4
Oncorhynchus mykiss irideus pop. 11
steelhead - Central Valley DPS
AFCHA0209K Threatened None G5T2Q S2 SSC
Oncorhynchus tshawytscha pop. 11
chinook salmon - Central Valley spring-run ESU
AFCHA0205L Threatened Threatened G5T2Q S2
Oncorhynchus tshawytscha pop. 7
chinook salmon - Sacramento River winter-run ESU
AFCHA0205B Endangered Endangered G5T1Q S2
Plagiobothrys hystriculus
bearded popcornflower
PDBOR0V0H0 None None G2 S2 1B.1
Plegadis chihi
white-faced ibis
ABNGE02020 None None G5 S3S4 WL
Pogonichthys macrolepidotus
Sacramento splittail
AFCJB34020 None None G3 S3 SSC
Progne subis
purple martin
ABPAU01010 None None G5 S3 SSC
Puccinellia simplex
California alkali grass
PMPOA53110 None None G2 S2 1B.2
Riparia riparia
bank swallow
ABPAU08010 None Threatened G5 S3
Sagittaria sanfordii
Sanford's arrowhead
PMALI040Q0 None None G3 S3 1B.2
Sidalcea keckii
Keck's checkerbloom
PDMAL110D0 Endangered None G2 S2 1B.1
Spirinchus thaleichthys pop. 2
longfin smelt - San Francisco Bay-Delta DPS
AFCHB03040 Endangered Threatened G5TNRQ S1
Symphyotrichum lentum
Suisun Marsh aster
PDASTE8470 None None G2 S2 1B.2
Taxidea taxus
American badger
AMAJF04010 None None G5 S3 SSC
Thamnophis gigas
giant gartersnake
ARADB36150 Threatened Threatened G2 S2
Trifolium hydrophilum
saline clover
PDFAB400R5 None None G2 S2 1B.2
Tuctoria mucronata
Crampton's tuctoria or Solano grass
PMPOA6N020 Endangered Endangered G1 S1 1B.1
Vireo bellii pusillus
least Bell's vireo
ABPBW01114 Endangered Endangered G5T2 S3
Xanthocephalus xanthocephalus
yellow-headed blackbird
ABPBXB3010 None None G5 S3 SSC
Record Count: 80
Report Printed on Friday, September 27, 2024
Commercial Version -- Dated September, 1 2024 -- Biogeographic Data Branch Page 4 of 4 Information Expires 3/1/2025
Selected Elements by Scientific Name
California Department of Fish and Wildlife
California Natural Diversity Database
281
09/27/2024 17:45:14 UTC
United States Department of the Interior

FISH AND WILDLIFE SERVICE
San Francisco Bay-Delta Fish And Wildlife
650 Capitol Mall
Suite 8-300
Sacramento, CA 95814
Phone: (916) 930-5603 Fax: (916) 930-5654
In Reply Refer To:

Project Code: 2024-0150529
Project Name: Southport Levee Trail Project
Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project
To Whom It May Concern:

The enclosed species list identifies threatened, endangered, proposed, and candidate species, as well as proposed, and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. The species list fulfills the requirements of the U.S. Fish and Wildlife Service (Service) under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.).

New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could change this list. Please feel free to contact us if you need more current information or assistance regarding the potential impacts to federally proposed, listed, and candidate species and federally designated and proposed critical habitat. Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of this species list should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the IPaC website at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the IPaC system by completing the same process used to receive the enclosed list.

The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat.

A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) 282
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
2 of 8
(c)). For projects other than major construction activities, the Service suggests that a biological evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12.

If a Federal agency determines, based on the Biological Assessment or biological evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at:
https://www.fws.gov/sites/default/files/documents/endangered-species-consultationhandbook.pdf Migratory Birds: In addition to responsibilities to protect threatened and endangered species under the Endangered Species Act (ESA), there are additional responsibilities under the Migratory Bird Treaty Act (MBTA) and the Bald and Golden Eagle Protection Act (BGEPA) to protect native birds from project-related impacts. Any activity, intentional or unintentional, resulting in take of migratory birds, including eagles, is prohibited unless otherwise permitted by the U.S. Fish and Wildlife Service (50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a)). For more information regarding these Acts, see https://www.fws.gov/program/migratory-bird-permit/whatwe-do.

The MBTA has no provision for allowing take of migratory birds that may be unintentionally killed or injured by otherwise lawful activities. It is the responsibility of the project proponent to comply with these Acts by identifying potential impacts to migratory birds and eagles within applicable NEPA documents (when there is a federal nexus) or a Bird/Eagle Conservation Plan (when there is no federal nexus). Proponents should implement conservation measures to avoid or minimize the production of project-related stressors or minimize the exposure of birds and their resources to the project-related stressors. For more information on avian stressors and recommended conservation measures, see https://www.fws.gov/library/collections/threats-birds.

In addition to MBTA and BGEPA, Executive Order 13186: Responsibilities of Federal Agencies to Protect Migratory Birds, obligates all Federal agencies that engage in or authorize activities that might affect migratory birds, to minimize those effects and encourage conservation measures that will improve bird populations. Executive Order 13186 provides for the protection of both migratory birds and migratory bird habitat. For information regarding the implementation of Executive Order 13186, please visit https://www.fws.gov/partner/council-conservationmigratory-birds.

Please be aware that bald and golden eagles are protected under the Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.), and projects affecting these species may require development of an eagle conservation plan (https://www.fws.gov/program/eagle-management/ working-around-eagles). Additionally, wind energy projects should follow the wind energy guidelines (https://www.fws.gov/node/266177) for minimizing impacts to migratory birds and 283
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
3 of 8
▪
bats.

Guidance for minimizing impacts to migratory birds for projects including communications towers (e.g., cellular, digital television, radio, and emergency broadcast) can be found at:https:// www.fws.gov/media/recommended-best-practices-communication-tower-design-sitingconstruction-operation; and http://www.towerkill.com.

We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Code in the header of this letter with any request for consultation or correspondence about your project that you submit to our office.

Attachment(s):

Official Species List

OFFICIAL SPECIES LIST
This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action".

This species list is provided by:

San Francisco Bay-Delta Fish And Wildlife
650 Capitol Mall
Suite 8-300
Sacramento, CA 95814
(916) 930-5603
284
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
4 of 8

PROJECT SUMMARY
Project Code: 2024-0150529
Project Name: Southport Levee Trail Project
Project Type: Road/Hwy - New Construction
Project Description: Bike and pedestrian trail project along southport levee.

Project Location:

The approximate location of the project can be viewed in Google Maps: https:// www.google.com/maps/@38.5172063,-121.55235315385221,14z Counties: Yolo County, California
285
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
5 of 8

1. ENDANGERED SPECIES ACT SPECIES
There is a total of 8 threatened, endangered, or candidate species on this species list.

Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species.

IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheries , as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce.

See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions.

NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce.
1 286
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
6 of 8
BIRDS

NAME STATUS
Least Bell's Vireo Vireo bellii pusillus
There is final critical habitat for this species. Your location does not overlap the critical habitat.

Species profile: https://ecos.fws.gov/ecp/species/5945
Endangered

REPTILES

NAME STATUS
Giant Garter Snake Thamnophis gigas
No critical habitat has been designated for this species.

Species profile: https://ecos.fws.gov/ecp/species/4482
Threatened

AMPHIBIANS

NAME STATUS
California Tiger Salamander Ambystoma californiense
Population: U.S.A. (Central CA DPS)
There is final critical habitat for this species. Your location does not overlap the critical habitat.

Species profile: https://ecos.fws.gov/ecp/species/2076
Threatened
Western Spadefoot Spea hammondii
No critical habitat has been designated for this species.

Species profile: https://ecos.fws.gov/ecp/species/5425
Proposed
Threatened

INSECTS

NAME STATUS
Monarch Butterfly Danaus plexippus
No critical habitat has been designated for this species.

Species profile: https://ecos.fws.gov/ecp/species/9743
Candidate
Valley Elderberry Longhorn Beetle Desmocerus californicus dimorphus There is final critical habitat for this species. Your location does not overlap the critical habitat.

Species profile: https://ecos.fws.gov/ecp/species/7850
Threatened

CRUSTACEANS

NAME STATUS
Vernal Pool Fairy Shrimp Branchinecta lynchi
There is final critical habitat for this species. Your location does not overlap the critical habitat.

Species profile: https://ecos.fws.gov/ecp/species/498
Threatened
Vernal Pool Tadpole Shrimp Lepidurus packardi
There is final critical habitat for this species. Your location does not overlap the critical habitat.

Species profile: https://ecos.fws.gov/ecp/species/2246
Endangered
287
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
7 of 8

CRITICAL HABITATS
There is 1 critical habitat wholly or partially within your project area under this office's jurisdiction.

NAME STATUS
Delta Smelt Hypomesus transpacificus
For information on why this critical habitat appears for your project, even though Delta Smelt is not on the list of potentially affected species at this location, contact the local field office. https://ecos.fws.gov/ecp/species/321#crithab
Final
288
Project code: 2024-0150529 09/27/2024 17:45:14 UTC
8 of 8

IPAC USER CONTACT INFORMATION
Agency: West Sacramento city
Name: Mike Trueblood
Address: 1504 Eureka Road, Suite 310
City: Roseville
State: CA
Zip: 95661
Email [email protected]
Phone: 9167727450

LEAD AGENCY CONTACT INFORMATION
Lead Agency: West Sacramento city
289

CITY COUNCIL AGENDA REPORT
MEETING DATE: June 18, 2025 ITEM # 12
SUBJECT:

CONSIDERATION OF APPROVAL OF THE PROJECT PLANS AND SPECIFICATIONS AND AWARD OF A CONSTRUCTION CONTRACT TO VSS INTERNATIONAL, INC. FOR THE 2025 PAVEMENT PRESERVATION PROJECT (CIP 17029)
INITIATED OR REQUESTED BY: REPORT COORDINATED OR PREPARED BY:
[ ] Council [ x ] Staff
[ ] Other
Joanna Ortiz, Assistant Engineer
Christian Asuncion, Associate Engineer
Capital Projects Department
ATTACHMENT [X ] Yes [ ] No [ ] Information [ ] Direction [X ] Action

OBJECTIVE
The objective of this report is to provide the City Council with sufficient information to consider approval of the plans and specifications; and award of a construction contract to the lowest responsive, responsible bidder VSS International, Inc. for the 2025 Pavement Preservation Project (CIP 17029).

RECOMMENDED ACTION
Staff respectfully recommends that the City Council:
1) Find that a Class 1 exemption under California Code of Regulations Title 14, Division 6, Chapter 3, Article 19, Section 15301 is the appropriate level of environmental review for CEQA for the construction of the 2025 Pavement Preservation Project;
2) Approve the Project Plans and Specifications for the 2025 Pavement Preservation Project (CIP 17029); 3) Award a construction contract to the lowest responsive, responsible bidder, VSS International, Inc. 4) Delegate Authority to the City Manager, or his designee, to execute a construction contract with VSS International, Inc. for an amount not to exceed $2,238,850; 5) Authorize the City Manager, or his designee to execute non-substantive changes or modifications, amendments, change orders, agreements, and purchases up to 20% of the construction contract ($447,770) with approval from the City Attorney;
6) Authorize the City Manager, or his designee, to extend the term of the construction contract with VSS International, Inc., if necessary.

BACKGROUND
Over the past few years, the City has received numerous requests to address potholes and pavement failures on various streets. To respond effectively, the City’s pavement management approach focuses on three key components: preservation, rehabilitation, and reconstruction.