Cities Index.
Agenda packet

Wildomar City Council
May 13, 2026

Document
Agenda packet
Meeting
May 13, 2026
Body
Wildomar City Council
Pages
33
Original file
235.8 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

If the Service Provider maintains broader coverage and/or higher limits than the minimums shown above, the City requires and shall be entitled to the broader coverage and/or higher limits maintained by the Service Provider. Any available insurance 870
proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the City.

Other Insurance Provisions
The insurance policies are to contain, or be endorsed to contain, the following provisions:

The City, its officers, officials, employees, and volunteers are to be covered as additional insureds on the CGL policy with respect to liability arising out of work or operations performed by or on behalf of the Service Provider including materials, parts, or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Service Provider’s insurance (at least as broad as ISO Form CG 20 10 11 85 or both CG 20 10, CG 20 26, CG 20 33, or CG 20 38; and CG 20 37 forms if later revisions used).

Primary Coverage
For any claims related to this Agreement, the Service Provider’s insurance coverage shall be primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects the City, its officers, officials, employees, and volunteers. Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Service Provider’s insurance and shall not contribute with it.

Notice of Cancellation
Service Provider shall provide immediate written notice if (1) any of the required insurance policies is terminated; (2) the limits of any of the required polices are reduced; (3) or the deductible or self-insured retention is increased. In the event of any cancellation or reduction in coverage or limits of any insurance, Service Provider shall forthwith obtain and submit proof of substitute insurance.

Waiver of Subrogation
Service Provider hereby grants to City a waiver of any right to subrogation which any insurer of said Service Provider may acquire against the City by virtue of the payment of any loss under such insurance. Service Provider agrees to obtain any endorsement that may be necessary to affect this waiver of subrogation, but this provision applies regardless of whether or not the City has received a waiver of subrogation endorsement from the insurer. However, the Workers’ Compensation policy shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Service Provider, its employees, agents and subcontractors.

Self-Insured Retentions
Self-insured retentions must be declared to and approved by the City. The City may require the Service Provider to provide proof of ability to pay losses and related investigations, claim administration, and defense expenses within the retention. The 871
policy language shall provide, or be endorsed to provide, that the self-insured retention may be satisfied by either the named insured or City.

Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the City.

Verification of Coverage
Service Provider shall furnish the City with original Certificates of Insurance including all required amendatory endorsements (or copies of the applicable policy language effecting coverage required by this clause) and a copy of the Declarations and Endorsement Page of the CGL policy listing all policy endorsements to City before work begins. However, failure to obtain the required documents prior to the work beginning shall not waive the Service Provider’s obligation to provide them. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements required by these specifications, at any time.

Subcontractors
Service Provider shall require and verify that all subcontractors maintain insurance meeting all the requirements stated herein, and Service Provider shall ensure that City is an additional insured on insurance required from subcontractors.

Special Risks or Circumstances
City reserves the right to modify these requirements, including limits, based on the nature of the risk, prior experience, insurer, coverage, or other special circumstances. 872

CITY OF WILDOMAR

CITY COUNCIL REGULAR MEETING

GENERAL BUSINESS
Agenda Staff Report # 3.1
Meeting Date: May 13, 2026
SUBJECT: Road Maintenance and Rehabilitation - Program Summary and Potential List of Streets for FY 26/27 Project
SUBMITTED BY: Jason Farag, Public Works Director/City Engineer PREPARED BY: Cameron Luna, Associate Engineer
ACTION:

Receive and file the Road Maintenance and Rehabilitation (Road Rehab) Update and receive and provide input on the proposed list of streets for the FY 26/27 Road Rehab Project.

SUMMARY:

The City administers an annual Road Maintenance and Rehabilitation Program (Road Rehab) with the use of RMRA funds. Streets are evaluated based on a variety of different criteria to determine which streets should be included in a specific Road Rehab project for a given year.

Staff is seeking Council and public input on the potential list of streets for the FY 26/27 Road Rehab Project.

BACKGROUND:

In 2017, Senate Bill 1 (SB 1), also known as the Road Repair and Accountability Act of 2017, created the Road Maintenance and Rehabilitation Program to address deferred maintenance on the State Highway System and the local street and road system. The Road Maintenance and Rehabilitation Account (RMRA) was established for the deposit of program funds. SB 1 increases transportation funding through gas taxes. A percentage of RMRA funding is apportioned to eligible cities and counties for basic road maintenance, rehabilitation, and critical safety projects.

The City of Wildomar receives an annual apportionment of funds from the RMRA that has been instrumental in establishing and funding the City's annual Road Maintenance and Rehabilitation Projects (Road Rehab) and the annual Slurry Seal Projects. The City began implementing the annual Road Rehab project in 2018 and has already rehabilitated many roads throughout the City using RMRA funds. A summary of the prior year projects and major streets that were rehabilitated is included below for reference.

The City's annual appropriation of RMRA funds varies from year to year but has generally increased each year. The estimated FY 26/27 apportionment for the City of Wildomar, as of January 2026, is $981,270.

Prior Road Rehab Projects
2018/2019 Project
Bundy Canyon Rd. (Oak Circle Dr. to The Farm Rd.)
Clinton Keith Rd. (Palomar St. to Renaissance Plaza - north side only) 873
Grand Ave. (Jane Ct. to McVicar St.)
Inland Valley Dr.
2019/2020 Project
Almond St. (Bundy Canyon Rd. to Waite St.)
Bryant St. (Grand Ave. to Union St.)
Black Beauty Trail
Dunn St. (Wildomar Trail to Pasadena St.)
Darby St. (Wildomar Trail to Pasadena St.)
Gruwell St. (Black Beauty Trail to Baxter Rd.)
Orchard St. (Walnut St. to Cashew St.)
Pony Cart Trail
Wesley St. (at Palomar St.)
Wildomar Trail (Grand Ave. to Palomar St.)
2021/2022 Project
Lemon St. (Gafford Rd. to north of Citrus Grove)
Grand Ave. (Jane Ct. to north of Kennemer Dr.)
60+ Residential Slurry Seal Streets
2023/2024 Project
Clinton Keith Rd (Grand Ave to Hidden Springs Rd)
Grand Ave (Willow Bay to Leslie St)
Grand Ave (Clinton Keith Rd to Royal Adelaide St)
Walnut St (Mission Trail to White St)
Cherry St (East of I-15, Bundy Canyon Rd to Waite St)
Waite St (East of I-15, Orange St to Sellers Rd)
Sellers Rd (Bundy Canyon Rd to Waite St)
Canyon Ranch Rd (Bundy Canyon Rd to Gafford Rd)
Gafford Rd (Great Falls Rd to Canyon Ranch Rd)
Wildomar Trail (Palomar St to Margaret Ln)
Cervera Road (Wildomar Trail to 325' East)
129 Residential Slurry Seal Streets
2024/2025 Project
Pavement Management Program Report
2025/2026 Project
Bundy Canyon Road (Mission Trail to Orange St)
Bundy Canyon Road (Orange St to Cherry St)
Bundy Canyon Road (West of Oak Circle to Sunset Ave)
Almond Street (Bundy Canyon Rd to Elsinore HS)
Orange Street (South of Waite St to Bundy Canyon Rd)
Gruwell Street (Front Street to Palomar Street)
"Deep Digout" Repairs on Almond St, Dunn St, Raynor St, Hidden Springs Rd, and Catt Rd
102 Residential Slurry Seal Streets
2 Slurry Seal Parking Lots (City Hall and Marna O'Brien Park) DISCUSSION:

Selecting which streets will be included in the annual Road Rehab or Slurry Seal Projects requires the consideration of several different criteria. The primary criteria that are considered include:

Pavement Condition Index (PCI)
Roadway Priority
874
Future Overlapping Projects
Public Input
Rehabilitation Costs
Pavement Condition Index
Pavement Condition Index (PCI) is a number that is used to describe the condition of pavement on a street. PCI can be based on a visual assessment of a road or based on an assessment made with the use of special instruments. PCI ratings range from 0 to 100 and are categorized as shown in Table 1 below.

Table 1 - PCI Ratings
PCI Condition Description
90-100 Excellent
70-90 Good
50-70 Fair/At Risk
25-50 Poor
0-25 Very Poor/Failed
As of February 2026, the City's network average PCI was 67. As part of a Pavement Management Program (PMP) that relies on the use of PCIs, it is generally recommended to prioritize and maintain roads with a higher PCI first. Maintaining higher PCI roads is less costly and extends the lifespan of the road, reducing long-term maintenance and repair costs. Once a road begins to deteriorate past the 'Good' condition, repair costs significantly increase. For roads that have already entered the 'Fair/At Risk' condition, or lower, preventative maintenance may not be the most effective option and more significant rehabilitation may be necessary, which significantly increases costs. The City is currently updating its PMP which will reevaluate the City's network PCI and provide guidance for the next six years.

Roadway Priority
Some roadways may have a higher priority than others based on classification and use. For example, arterial or regional roads that carry large amounts of daily traffic, have high speeds, and experience heavy traffic loads may warrant more immediate attention due to the reliance of a larger number of daily users on that road. Roads that serve specific uses such as schools, hospitals, or other similar uses may also have a higher priority than other streets.

Future Overlapping Projects
There are several roads throughout the City that are part of upcoming Capital Improvement Projects or Private Development Projects. These projects may already be scoped to widen, improve, and/or rehabilitate pavement. As a result, staff takes into consideration these upcoming projects to maximize cost efficiencies, minimize waste, and minimize traffic impacts.

For example, including road rehab in the scope of a widening project minimizes disruption to drivers by limiting the work to one larger combined project rather than having one contractor repave the street in one year, and another contractor widen the street in a subsequent year.

Private Development Projects that are conditioned to provide certain improvements are also responsible for the costs of those improvements. This reduces the City's costs for maintenance and allows the City to use those funds to maintain other roads.

Public Input
The City regularly receives feedback from the public about roadway conditions and areas that 875
may need maintenance. In addition to the City's routine maintenance schedule, the City responds to and addresses these requests as they arrive. Staff makes note of where repetitive requests are received, or where repetitive maintenance on a specific street is observed and would be better addressed by a larger rehabilitation project. Staff also takes into consideration locations that are specifically requested by residents for general repaving or rehabilitation.

Rehabilitation Costs
Road rehabilitation strategies can vary significantly in cost. Slurry seals and microsurfacing are surface treatments designed to work in conjunction with crack sealing to help seal the asphalt surface to protect the roadway from intrusion of water into the base layers, which could result in base and pavement failure. Slurry seals are generally a lower cost preventative maintenance measure. Asphalt overlays are more expensive due to the cost of the asphalt and the methods and equipment required to place the asphalt. Removals and replacements of asphalt are even more expensive due to the cost of equipment to remove and dispose of the material, and the increased cost to implement traffic control. Based on available budgets, rehabilitation of certain streets may be limited in a given year.

A list of the streets previously approved and a list of additional potential streets to be considered for the next year's project are included below.

Potential Streets to be Considered for the FY 2026/2027 Project (next year's project)
The Farm Road, 100' S of Bundy Canyon Road to Citrus Hill Harvest Way, Bundy Canyon Road to Citrus Hill
Lemon Street, Mission Trail to Grape Street
Gruwell Street, Union Street to Grand Avenue
Cherry Street, Baxter Road to Canyon Drive
Almond Street, Canyon Drive to Wesley Street
Grand Avenue, McVicar Street to Jane Court
Raynor Street, Orange St to end of City maintained road Wesley Street, Grand Avenue to Union Street
ARAM, Chip Seals, and/or Slurry Seals through various residential streets Remove and Replace ("Deep Digout") locations Citywide
CIP 025 Clinton Keith Road (Hidden Springs Rd. to Eastern City limits) CIP 026-2 Bundy Canyon Road (Oak Canyon Dr. to The Farm Rd.) CIP 044-3 Mission Trail (Malaga Rd. to Elberta Rd.)
CIP 050-1 Pavement Management Program - Street Asset Inventory To be eligible to use RMRA funds, the City is required to adopt a resolution each year identifying a list of the streets that are proposed for the next fiscal year's budget. This resolution must be submitted to the California Transportation Commission (CTC) before the City can receive its appropriation of RMRA funds for the fiscal year. It should be noted that depending on the type of pavement rehabilitation required for each street, total costs may exceed available funds, and so it is possible that the rehabilitation for some streets may need to be rescheduled in a future fiscal year.

The RMRA program also requires that there be a public input process on the selection of streets included in the resolution. While the City already accepts and considers public input throughout the year, staff would like to receive any additional input from the public or the City Council on the potential list of streets to be considered for next fiscal year's project. With this feedback, staff will complete the evaluation of streets and bring forward a resolution with a 876
final list of streets for City Council consideration and adoption at the June Council Meeting.

FISCAL IMPACT:

Road Rehab is included in the annual CIP Program Budget and typically makes use of RMRA, Measure AA, and Measure A funds. There is no impact to the General Fund.

ATTACHMENTS:

Presentation - Road Maintenance and Rehabilitation
877
Road
Maintenance
and
Rehabilitation
Program Summary and
Potential List of Streetsfor FY26/27
Public Works Department
City of Wildomar
May 13, 2026
878
Road Repair and
Accountability Act of 2017
• Senate Bill (SB) 1 – Road Repair and Accountability Act • Created Road Maintenance and Rehabilitation Program
• Created Road Maintenance and Rehabilitation Account
(RMRA) for program funding
• Increased funding through gas tax
• Percentage of funding apportioned for counties and citiesfor basic road maintenance, rehabilitation, and safety projects. • City receives annual appropriation from RMRA.
• City’s FY 26/27 apportionment estimated at $981,270 (as of January 2026).
879
City’s Road
Maintenance and
Rehabilitation
Program
• Bundy Canyon Rd. (Oak Circle Dr.to The Farm Rd.)
• Clinton Keith Rd. (Palomar St. to Renaissance Plaza - north side only) • Grand Ave. (Jane Ct. to McVicar St.)
• Inland Valley Dr.
2018/2019
• Almond St. (Bundy Canyon Rd. to Waite St.)
• Bryant St. (Grand Ave. to Union St.)
• Black Beauty Trail
• Dunn St. (Wildomar Trail to Pasadena St.)
• Darby St. (Wildomar Trail to Pasadena St.)
• Gruwell St. (Black Beauty Trail to Baxter Rd.)
• Orchard St. (Walnut St. to Cashew St.)
• Pony Cart Trail
• Wesley St. (at Palomar St.)
• Wildomar Trail (Grand Ave. to Palomar St.)
2019/2020
880
City’s Road
Maintenance and
Rehabilitation
Program
2021/2022
• Lemon St. (Gafford Rd. to north of Citrus Grove)
• Grand Ave. (Jane Ct. to north of Kennemer Dr.)
• 60+ Residential Slurry Seal Streets
• Clinton Keith Rd (Grand Ave to Hidden Springs Rd)
• Grand Ave (Willow Bay to Leslie St)
• Grand Ave (Clinton Keith Rd to Royal Adelaide St)
• Walnut St (Mission Trail to White St)
• Cherry St (East of I-15, Bundy Canyon Rd to Waite St) • Waite St (East of I-15, Orange St to Sellers Road)
• Sellers Rd (Bundy Canyon Rd to Waite St)
• Canyon Ranch Rd (Bundy Canyon Rd to Gafford Rd)
• Gafford Rd (Great Falls Rd to Canyon Ranch Rd)
• Wildomar Trail (Palomar St to Margaret Ln)
• Cervera Road (Wildomar Trail to 325' East)
• 129 Residential Slurry Seal Streets
2023/2024
881
City’s Road
Maintenance and
Rehabilitation
Program
2025/2026
• Bundy Canyon Road (Mission Trail to Orange St)
• Bundy Canyon Road (Orange St to Cherry St)
• Bundy Canyon Road (West of Oak Circle to Sunset Ave)
• Almond Street (South of Bundy Canyon Rd, Canyon Dr to Walnut St) • Orange Street (South of Waite St to Bundy Canyon Rd)
• Gruwell Street (Front Street to Palomar Street)
• 3” Deep Digout Repairs on Dunn St, Raynor St, Via Sarah, Hidden Springs Rd and Catt Rd
• 102 Residential Slurry Seal Streets
• 2 Slurry Seal Parking Lots (City Hall and Marna O'Brien Park) 2026/2027
• To be determined
2024/2025
• Pavement Management Program Update
882
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT REHABILITATION
COSTS
883
Pavement
Condition
Index
PCI Condition Description
90-100 Excellent
70-90 Good
50-70 Fair/At Risk
25-50 Poor
0-25 Very Poor/Failed
884
2026
Pavement
Management
Program Update:
885
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT REHABILITATION
COSTS
886
Roadway
Priority
887
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT REHABILITATION
COSTS
888
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT REHABILITATION
COSTS
889
Road Selection Criteria

PAVEMENT

CONDITION INDEX
(PCI)

ROADWAY PRIORITY FUTURE

OVERLAPPING

PROJECTS

PUBLIC INPUT REHABILITATION
COSTS
890
Budgeting Rehabilitation Costs
=

1. RMRA Funds

2. Local Funds (Measure A/AA)

3. Grants 891
202
6/2027 Project
(Potential Rehab Streets)
Note: Map is in draft form and
street selection is subject to final
revisions prior to advertisement.
• Clinton Keith Rd. • The Farm Rd. • Harvest Way • Grand Ave. • Gruwell St. • Wesley St.• Mission Trail • Almond St. • Cherry St. • Lemon St. • Orange St. 892
202
6/2027 Project
(Potential ARAM, Chip Seal,
Slurry Streets)
Note: Map is in draft form and
street selection is subject to final
revisions prior to advertisement.
•The Farm
• Windsong Valley • Residential Streets near Grand Ave, Palomar Rd.& Clinton Keith Rd.
893
Potential List of Streets for 2026/2027 Project
• The Farm Road, 100' S of Bundy Canyon Road to Citrus Hill • Harvest Way, Bundy Canyon Road to Citrus Hill
• Lemon Street, Mission Trail to Grape Street
• Gruwell Street, Union Street to Grand Avenue
• Cherry Street, Baxter Road to Canyon Drive
• Almond Street, Canyon Drive to Wesley Street
• Grand Avenue, McVicar Street to Jane Court
• Wesley Street, Grand Avenue to Union Street
• ARAM, Chip Seals, and/or Slurry Seals through various residential streets • Remove and Replace ("Deep Digout") locations Citywide • CIP 025 Clinton Keith Road (Hidden Springs Rd. to Eastern City limits) • CIP 026-2 Bundy Canyon Road (Oak Canyon Dr. to The Farm Rd.) • CIP 044-3 Mission Trail (Malaga Rd. to Elberta Rd.)
• CIP 050-1 Pavement Management Program - Street Asset Inventory 894
Questions
and Input
895

CITY OF WILDOMAR

CITY COUNCIL REGULAR MEETING

GENERAL BUSINESS
Agenda Staff Report # 3.2
Meeting Date: May 13, 2026
SUBJECT: Streetlight Program Feasibility Analysis and Phase 1 Streetlight Project
SUBMITTED BY: Jason Farag, Public Works Director/City Engineer PREPARED BY: Ninette Eva, Associate Engineer
ACTION:

Approve the Phase 1 Streetlight Project recommendation and direct staff to add the Phase 1 Streetlight Project to the Citys 5-Year (FY 2026-27 to FY 2030-31) Capital Improvement Program.

SUMMARY:

This project proposes the installation of new streetlights in certain locations throughout the City.

BACKGROUND:

Over the years, staff has received requests from residents and community members for improved streetlighting. More recently, staff received a request to evaluate streetlighting in and around the Sedco area and on Catt Road. In addition, the City’s Local Roadway Safety Plan (LRSP) identified specific locations/intersections where the installation of streetlights is recommended to enhance night-time visibility and safety for motorists and pedestrians.

DISCUSSION:

To provide a comprehensive analysis, City staff reviewed the recommended intersections and segments requested and included in the LRSP to determine the type(s) of streetlights and most probable general locations; met with SCE to understand the costs of the different rates, process, and time required for coordination and design; and gathered costs and estimates for the different streetlights being recommended for installation. Below is a result of the analysis:

Streetlight Type
Cost Range Per
Light (includes
materials and
installation)
Factors to Consider
Suggested
Funding
Sources
896
Streetlights on
Existing SCE Utility
Poles
$1,700 to $2,500
- SCE owned streetlights
- SCE design process and
agreements
- Low initial installation costs
- Monthly energy costs (LS-1 rate)
- City's responsibility for
maintenance and replacement with
SCE requirements.
- Local Funds
Solar-Powered
Streetlights Option
$6,000-$8,000
- City owned streetlights
- Off-grid system. No monthly energy
costs.
- Higher installation costs (pole and
direct burial).
- Streetlights can be relocated.
- City's responsibility for
maintenance and replacement.
- Local Funds
- Grants
(CDBG,
SS4A, HSIP,
etc.)
New Streetlight on
New Utility Pole
Option
$10,000-$12,000
- City owned streetlights
- SCE design process and
agreements to provide power.
- Highest installation costs (pole,
permanent foundation, conduit).
- Monthly energy costs (LS-2,
unmetered or LS-3, metered rates).
- City's responsibility for
maintenance and replacement.
- Local Funds
- Grants
(CFBG,
SS4A, HSIP,
etc.)
The total preliminary costs to install streetlights at the locations that were requested and the locations recommended by the LRSP are included in the table below.

Streetlight Type
Total Cost Range
(include materials and
installation)
Streetlights on Existing SCE
Utility Poles
Requested Locations
Intersections: $20,000 to
$30,000
Streets: $131,000 to
$205,000
LRSP Locations
Streets: $100,000 to
$177,000
897
Solar-Powered Streetlights
(alternative option)
Streets: $150,000 to
$185,000
New Streetlight on New Utility
Pole (alternative option)
Streets: $350,000 to
$385,000
TOTAL $401,000 to $797,000
Based on the analysis provided above, staff recommends the creation of an initial Streetlight Project (Phase 1) that includes the installation of streetlights on existing SCE utility poles at the following intersections and Street Segments, and inclusion of this Phase 1 Streetlight Project into the City's 5-Year (FY 2026-27 to FY 2030-31) Capital Improvement Program for funding. The 5-Year CIP, including project budgets, will be brought forward at a future City Council meeting for adoption.

Intersections
Lemon St/Orchard St
Lemon St/Loquat St
Lemon St/Almond St
Lemon St/Grape St
Lemon St/Gafford Rd
Mission Trail/Waite St
Waite St/Bonnie Ln
Waite St/Almond St
Waite St/Mojonnier Way
Waite St/Almond St
Waite St/Amberton Dr
Almond/Walnut
Streets (Sedco and Catt Rd.)
Olive Street (Mission Trail to Mountain View Ave)
Lemon Street (Mission Trail to Gafford Rd)
Waite Street (Mission Trail to Orange Street)
Almond Street (Lemon St to Waite St)
Almond Street (Canyon Dr to Walnut St)
Almond Street (34699 Almond St to Grove St)
Catt Road (between Avry Way and Hidden Springs Rd.)
Streets (LRSP)
Grand Avenue (Corydon Rd to Richard St)
Mission Trail (Malaga Rd to Corydon Rd)
Mission Trail (Cordyon Rd to Bundy Canyon Rd)
Clinton Keith (Wildomar Trail to Elizabeth Ln)
FISCAL IMPACT:
898
There is no immediate impact associated with the approval of the Phase 1 Streetlight Project.

Staff will identify the funding source for the Phase 1 Streetlight Project and bring it to the City Council with the proposed 5-Year (FY 2026-27 to FY 2030-31) Capital Improvement Program recommendations for approval at a later date. The total approximate cost for the Phase 1 Streetlight Project is estimated to range between $251,000 and $412,000, as detailed below.

Requested Locations
Intersections: $20,000 to $30,000
Streets: $131,000 to $205,000
LRSP Locations
Streets: $100,000 to $177,000
ATTACHMENTS:

Presentation
899

CITY OF WILDOMAR

PUBLIC WORKS/ENGINEERING DEPARTMENT

CITY COUNCIL MEETING
MAY 13, 2026
Streetlight Program
Feasibility Analysis and
Phase 1 Streetlight Project
900

COMMUNITY REQUESTS
Over the years, the City has received
requests for street lighting in areas
throughout the City.

LOCAL ROADWAY

SAFETY PLAN (LRSP)
The City’s LRSP also recommended
installation of streetlights on several
intersections and street segments to
improve nighttime visibility for motorists
and pedestrians.
901

SEDCO AND NEARBY AREAS
The Sedco Area and nearby locations have recently been requested for consideration for streetlight installation.

Much of the area does not currently have street lighting. The areas include:
• Olive Street from Mission Trail to Orchard Street
• Lemon Street from Mission Trail to Gafford Road
• Waite Street from Mission Trail to Orange Street
• Almond Street from Lemon Street to Bundy Canyon Road
• Almond Street from Canyon Drive to Grove Street
902

CATT ROAD
Catt Rd. west of the I-15, near Hidden Springs Rd., has also been recently requested for a streetlight installation. 903

LOCAL ROADWAY SAFETY PLAN (LRSP)

RECOMMENDATIONS
In the LRSP, lighting improvements were one of the improvements identified as most likely to create safety benefits in the City. The City has sought grant funding for these improvements but has not been successful. Recommended locations include:
• Grand Avenue from Corydon Road to Richard Street (shared with County of Riverside)
• Grand Ave. at Gruwell St.
• Clinton Keith Road from Wildomar Trail to Elizabeth Lane • Mission Trail from Malaga Road to Corydon Road (shared with Lake Elsinore) • Mission Trail from Corydon Road to Bundy Canyon Road
904

STREETLIGHT OPTIONS
2 Solar-Powered Street Lights
Stand-alone solar LED streetlights with battery
storage.

Independent system.

No utility connection required.

Estimated Installation Cost for Each
$6,000 - $8,000
3 New Streetlight Pole and Fixture
Full installation with a new streetlight pole and
streetlight fixture. City owned lights.

Includes underground conduits and may required new
meter installation. Requires more significant
coordination and design with SCE (Long Lead).

Estimated Installation Cost for Each
$10,000 - $12,000
1 New Streetlight on Existing SCE Utility Pole
New streetlight installed on existing SCE utility pole.

City will not own streetlights.

Requires coordination and design with SCE.

Maintenance Agreement. Monthly costs.

Estimated Installation Cost for Each
$1,700 - $2,500
905

COSTS AND CONSIDERATIONS
2 Solar-Powered Street Lights
• Higher capital cost, no on-going monthly utility costs. • Can be relocated. May require
maintenance/replacement after a certain number of
years based on lifespan of batteries and solar panels.
3 New Streetlight Pole and Fixture
• Highest capital cost, on-going monthly electrical utility costs.
• Requires more detailed design plans and potential
meter installations.
• May need to be relocated in the future when roads are widened/sidewalks added, etc…
1 New Streetlight on Existing SCE Utility Pole
• Low capital cost, on-going monthly electrical utility costs.
• Limited to locations where utility poles exist.
906

PRELIMINARY ESTIMATES
Lighting Type Low Cost High Cost Average
Cost
Intersections $20,000 $30,000 $25,000
Streets
(LRSP) $100,000 $177,000 $138,500
Streets
(Requested Areas) $131,000 $205,000 $168,000
The table below identifies preliminary cost estimates for installing new lights only on existing utility poles. These do not reflect costs to install separate streetlight poles or solar lighting where no utility poles exist.
907
NEXT STEPS • Staff recommends adding a Phase 1
Streetlight Project that includes the
installation of streetlights on existing SCE
utility poles at the requested locations
and LRSP recommended locations.
• The Phase 1 Streetlight Project will be
included as a new project in the 5-Year
CIP for FY 26-27.
• Staff will identify the funding sources for
installation and operational costs (utility
bill and maintenance).
•Proceed with construction/installation.
908
Questions?
909

← All documents from this meeting