July 19, 2022

Document
Agenda packet
Meeting
July 19, 2022
Body
Woodland City Council
Pages
789
Original file
344.7 MB
Text extracted from the city's file for reading and search. Open the original on woodlandca.api.civicclerk.com. That file is the official record.

width for the whole of the development is 37 feet which substantially complies with the minimum lot width requirement for the R-15 zone of 35 feet (12% are below 34 ft width). The Spring Lake Specific Plan does not have a required minimum lot size or lot depth. Lot sizes will range from 1,943 to 3,073 square feet with 2,367 average square feet.

The square shape of the parcel has resulted in parcels with lot depths of 55 to 60 feet in depth. The main circulation route within the development is on an internal private loop street, with a majority of the homes facing onto three interior paseos running north to south. All homes will have two-car garages, and an additional 59 guest parking spaces are to be provided on-site for a total of 233 parking spaces in the overall development. There is additional on-street parking available on Miekle Avenue and Christiansen Circle (via a pedestrian walkway). The two-car garages for the homes are alley-loaded with the main entryway accessed either from paseos or Miekle Avenue.

Under the proposed PD, setbacks will be 3.5-feet on either side, 4-feet to the rear of the garage/house, and 4 feet from the front of the house to the paseo open space parcel. Each of the interior pedestrian paseos that run north to south within the site, is 8-feet in width with each facing home having a 4-foot setback from the paseo allowing for a 16-foot open area between home fronts. The front yard setbacks along Miekle Avenue will be a minimum of 10 feet. Additionally, the side yards will be shared between lots to provide a larger area for waste receptacle storage and useable, private outdoor space. Homes will provide a minimum of 3.5-foot wide interior side yard and a reciprocal use easement allowing one home access rights to the adjacent property side yard providing a minimum of a 5-foot interior side yard to a 10-foot side yard on exterior lots adjacent to streets and boundary of site (usable outdoor space for each lot), and the setback of the proposed houses to the property to the north will be 10 feet as well.

Ruby Estates Plot Plan
Along the western project boundary, the house plans are configured to face onto the naturalized open space/drainage area and greenbelt to the west that was installed as part of the adjacent Spring Lake Oyang South development by Lennar Homes. Homes at the site perimeters are set back a minimum of 10-feet, consistent with

Page 159 ends

Spring Lake's standard rear setback for R-15. Two pedestrian connections (Lots A & B) are proposed along the western edge of the site to provide connectivity to the homes fronting onto the naturalized open space and via a pedestrian walking path that will cross over to the Oyang South subdivision located west of Christiansen Circle. A pedestrian path will also be provided along the southern property boundary to provide connectivity to the overall Spring Lake perimeter greenbelt that is located along the north side of County Road 25A.

Lot A is proposed as an open space parcel for the project and will include a pergola and bench as shown in the enclosed landscape exhibits, as well as providing connectivity to the open space/drainage channel and existing subdivision to the west. The open space and overcrossing are located in the northwest portion of the site and align with the northern portion of the internal circulation loop, as well as providing connection to additional parking and greenbelts to the west in the Oyang South subdivision. This parcel along with the other lettered lots that comprise the paseos, pass-throughs, and shared walkway will provide access to the front doors of the homes on the western edge of the project site. The park, paseo, walkway, and shared landscaping account for approximately 17,860 square feet (.41 acres) of common open space. Homes along the east boundary will front onto Miekle Avenue to create an attractive street scene with alley-loaded garages in the rear. The front yard setbacks along Miekle Avenue will be a minimum of 10 feet.

A Homeowners Association will assist in the management of landscaping, utilities, and use restrictions, including a restriction on parking along interior driveways and a requirement that garage space is maintained for parking. Recreational vehicle parking will be prohibited.

Infrastructure
The developer will construct all internal private streets and utilities and all project components, including the paseo paths and landscaping. Perimeter utilities, including curb, gutter, sidewalk, and streetlights as well as a trafficcalming round-about were installed with the Heritage Remainder Phase Two subdivision improvements along Miekle Avenue. Project access will be primarily from the Collector Roadways, Miekle Avenue, as well as from County Road 25A with direct vehicular access from Miekle Avenue only. The project will provide water, sewer, storm drain, and other required utilities. An off-site culvert walking path will be installed as a crossing over the western naturalized open space/drainage area that will connect with the interior Spring Lake greenbelt and Oyang South development. Additionally, the development will install the completion of the traffic signal at County Road 25A and County Road 102.

Planned Development/Conditional Use Permit Request
The project proposes minor modifications from the minimum lot width and lot coverage zoning requirement as well as interior setback requirements provided in the Spring Lake Specific Plan. The purpose of the Planned Development (PD) Overlay is to encourage creative and more efficient use of land by providing some flexibility in design not possible through the strict application of zoning standards. The proposed modifications will allow a small-lot product, adding to the mix of housing types in the Spring Lake Specific Plan area.

The Spring Lake Specific Plan expresses a desire to see a variety of housing types, including small-lot infill. However, the standards provided at the time of the Spring Lake Specific Plan outlined in Table 2.4 do not explicitly allow exceptions for this small-lot product type that is currently occurring in the California housing market. Therefore, the PD Overlay will allow for modification of setbacks for this project. The setbacks for the perimeter conditions meet the required Plan standards and it is the project interior where exceptions are requested.

Site Plan and Design Review Request
The project application request includes site development plans including floor plans, landscaping, and architectural renderings. The project design review was performed using the Spring Lake Specific Plan (SLSP) (adopted December 18, 2001, and subsequently amended) and the Spring Lake Specific Plan Design Standards (SLSPDS) as approved May 20, 2003, and subsequently amended.

The architectural plans feature alley-loaded rear-entry garage orientations off the private. Home fronts are generally oriented toward interior paseos with exceptions on the east and west site boundary that face out to adjacent neighboring developments. Each home will have a two-car garage and the site will have additional 59 on-site guest parking spaces. The site has an internal circulation loop with the alleyways and paseos extending off this main circulation route. At the northwest portion of the development, there will be an open space park area with a picnic area and seating for flexible outdoor use.

Page 160 ends

Development Agreement Request
Resolution No. 3542, adopted on May 15, 1990, establishes procedures for the consideration of Development Agreements in Woodland. These procedures essentially parallel the requirements of Section 65864 et.seq. of the Government Code. The Spring Lake Specific Plan (SLSP) requires that each developer enters into a Development Agreement with the City. Development Agreements allow the City to negotiate certain development rights for the applicant in exchange for benefits to the City that might not otherwise be required of a developer. A development agreement was approved as part of the Heritage Remainder with subsequent amendments approved on July 1, 2014, by the City Council. An amended development agreement will replace the original agreement for the Ruby Estates properties. Final negotiated terms will be included in the development agreement prior to the City Council hearing on the application.

The proposed development agreement provides for negotiated features or amenities for the public benefit. Along with the standard impact fees associated with development, the proposed draft development agreement also includes the following:
 The applicant has agreed to pay fees in lieu of constructing the affordable housing of $3,900 per lot for the ten percent low-income obligation for the nine units, which results in an overall payment of $339,300. This is consistent with per unit in-lieu fees charged on other small-lot single-family projects in Spring Lake.  The applicant has agreed to pay a General Purpose fee in the amount of $5,000 per lot, which results in an overall payment of $435,000. The funds are to be paid in one lump sum amount upon final map and will be used for community facilities such as city pool, fire station and to improve bicycle and pedestrian connectivity, including but not limited to the planned Highway 113 bike/pedestrian overcrossing.  The applicant has agreed to replace all frontage that is cracked and broken or does not meet ADA standards with City-Standard ADA-compliant driveways, curb, gutter, or sidewalk.  6-foot masonry privacy wall that will extend along most of the southern subdivision boundary.  The completion of the traffic signal at County Road 25A and County Road 102 Public Notification
Public notice advertising for the public hearing on this project was prepared by the Community Development Department in accordance with notification procedures set forth in the City of Woodland’s Municipal Code and State Planning Law. Two methods of public notice were used:
 The legal notice was published in the Woodland Daily Democrat.  Notices were mailed to all property owners within 1,000 feet of the project site.

Copies of the factual staff report for the proposed project have been on file at City Hall since June 10, 2022.

Environmental Clearance
On August 15, 2000, the City Council certified the Turn of the Century Final EIR (State Clearinghouse Number 1199022069; Resolution No. 4215 adopted August 15, 2000). The City Council subsequently adopted several CEQA Addenda to the Turn of the Century EIR.

Technical Studies
The SLSP requires that each development application include certain project level and property-specific technical analyses to demonstrate consistency with the performance thresholds and requirements of the SLSP and SLSP Mitigation Monitoring Plan. The following studies have been prepared in fulfillment of these requirements as part of the Ruby Ranch Tentative Subdivision analysis. The applicant has submitted updated Geotechnical Evaluations. The Cultural Survey and Biological Analysis are from the original Tentative Map (July 1, 2014) submittal since there have been no new conditions that would require the submittal of new studies:
 Biological Resources Analysis, SLSP TOC 403 acres, Foothill and Associates, April 28, 2005  Cultural Resources Survey and Assessments, TOC Development, Cultural Resources Unlimited, March 2005  Limited Geotechnical Evaluation of Existing Fill, Heritage Development – Parcel 4 prepared for the project by Geocon Consultants, Inc. (Geocon) dated August 27, 2021 (Geocon Project No. S2028-05-01)

Page 161 ends

 Preliminary Geotechnical Feasibility Assessment, Proposed Residential Development – Ruby Estates prepared by Quantum Geotechnical, Inc. (Quantum) dated September 23, 2021 (Quantum Project No.

H055.G)
City staff have previously reviewed each of these studies and reached the following conclusions:

1. The studies satisfy the SLSP requirements;

2. Applicable requirements or conditions recommended in the study have been included as conditions of approval for this project;

3. The studies identify no environmental circumstances specific to the site or the proposed project that was not previously anticipated and addressed in the original EIR.

Agricultural and Swainson Hawk Mitigation Easements
In 2006, the property secured mitigation easements via participation in the Merritt Property conservation easement. The project shall comply with the Swainson Hawk and Ground Nesting Raptor survey Requirements of the SL TOC EIR Mitigation Plan.

Review Agency Comments
The application was circulated for review by agencies of jurisdiction. The comments from Development Engineering, Public Works, Building, and Fire, have been incorporated as Conditions of Approval.

Staff Analysis
Staff supports this project, subject to the recommended provisions in the Development Agreement and conditions of approval, and provides the following analysis:

General Plan Consistency
Land Use
The Spring Lake Specific Plan has been determined by the City Council to be consistent with the General Plan. The project, with the proposed conditions of approval, Development Agreement, and Tentative Subdivision Map, has been determined by staff to be consistent with the SLSP and with the goals and policies of the General Plan. The project is consistent with the medium density General Plan land use that allows a density of 8.1 to 19.9 dwelling units per acre, which allows a range of product types including apartments, town-homes, and small-lot development. The project is a small-lot single-family development at a proposed overall density of 12.5 dwelling units per acre. The project is consistent with key policies in the General Plan as summarized below:

Policy 2.A.5 Complete and Well-Designed Neighborhoods. Promote the development of complete neighborhoods with a physical layout and land use mix that allows for a diversity of incomes; puts residents in close proximity to services and amenities; promotes walking, biking, and transit use; fosters community pride; enhances neighborhood identity; ensures public safety; and meets the needs of all ages and abilities.

Policy 2.A.6 Infill Development. Encourage infill, redevelopment of, and development on underutilized sites, adaptive reuse, and the restoration of historic buildings in existing urbanized areas to enhance community character; promote pedestrian and bicycle-friendly neighborhoods, increase housing diversity, ensure the integrity of historic districts, optimize city investment in infrastructure, support increased transit use, and enhance economic vitality.

Policy 2.C.1 Compact Form. Promote compact development patterns, mixed land use, and higher development intensities that conserve land resources, reduce vehicle trips, improve air quality, and facilitate walking, bicycling, and transit use. Achieving the benefits of compact development as supported in this General Plan may result in potential tradeoffs related to traffic, noise, open space, and privacy. Sensitive design and appropriate performance standards may assist in mitigating these concerns. Where growth and increased density is allowed pursuant to this General Plan, these issues are acknowledged and accepted.

Policy 2.G.2 Sensitive New Development. Require new construction additions, renovations, and infill to be physically compatible with neighborhood context, historic development patterns, building form, and scale.

Policy 3.A.1 Vehicle Level of Service (LOS) Standard. Strive to develop and manage the roadway system to maintain a LOS D or better as defined in the latest edition of the Highway Capacity Manual during weekday AM and

Page 162 ends

PM peak hour conditions.

Policy 3.D.3 Traffic Calming. Implement traffic calming design and devise, as funding allows, in existing and new development areas where appropriate to reduce vehicle speeds and preserve neighborhood livability.

Policy 3.H.6 Parking Standards. Reduce minimum parking requirements and set maximums over time, particularly for mixed-use and transit-oriented developments, to promote walk and bike-friendly environments throughout the city.

Climate Action Plan
The project applicant completed the Climate Action Plan (CAP) Checklist and has been determined to be consistent with the City’s 2035 CAP. All buildings shall be designed to meet, and are recommended to exceed, energy efficiency requirements provided in the Spring Lake Specific Plan, including solar requirements.

Each home shall include the installation of photovoltaic panels, be prewired for electric vehicle charging, provide high-efficiency HVAC, high-efficiency windows that are operable, and will provide for cross-ventilation, and energyefficient lighting. Will meet all Title 24 requirements. The subdivision design encourages pedestrian use by including internal paseos and walkways that connect the project both internally and to surrounding areas. Bike storage is available in garages or in private yard areas of each home. Paseos and lot landscaping will utilize native and drought-tolerant landscaping. Canopy shade trees are proposed along all street fronts and adjacent to parking. Water-conserving fixtures and features are included in all homes and each home will have sufficient space for solid waste as well as green waste storage. The project will comply with construction recycling regulations. The project will comply with the recently adopted 2019 Building, Residential, Building Energy Efficiency Standards, and California Green Building Codes.

Each home shall have a dedicated 240-volt, 40-amp circuit for an electric vehicle charging station in the garage or as required by the most current California Green Building Standards. Garages shall have adequate ventilation as required for vehicle charging stations. Compliance with this condition shall be clearly indicated on the building permit plans for each single-family home.

Concerning heat island concerns, the project will include substantial plantings as illustrated on the conceptual landscape plans. Large trees are provided for shading sidewalks and street parking. Within the development, trees will be planted to provide shading within internal walkways, at guest parking locations, and at homes Zoning Ordinance Consistency
Lot Coverage - The maximum allowable lot coverage is 50 percent. Individual lot coverages vary from 37 percent to 65 percent, with an average of 53 percent lot coverage. The applicant has submitted a Planned Development (PD) proposal to allow increased individual lot coverage that exceeds 50%.With the overall project building coverage as a whole at 4.78 acres and the open space (less any driveway areas) at 0.41 acres resulting in an overall proposed coverage for the project of 67%
Off-Street Parking - Pursuant to Section 25-23-10A of the Zoning Ordinance, the applicable parking ratio for singlefamily is two (2) parking spaces per unit. The multi-family parking ratio is 1.5 spaces per unit. The project provides a minimum of two covered parking spaces in a garage for each unit. An additional 59 guest-parking stalls are provided on-site. A total of 233 parking spaces are provided on-site (parking ratio of 2.68) with additional on-street parking spaces available on Miekle Avenue and Christiansen Circle via the open space culvert overcrossing on the northwest property boundary.

Water Conservation Ordinance - The project shall comply with the City’s Water Conservation Ordinance and any applicable state water conservation requirements.

The proposed project as conditioned is consistent with the City’s Zoning Ordinance.

Spring Lake Specific Plan Consistency
In order to assess project consistency with the SLSP development requirements, a detailed analysis was performed comparing the project proposal to each section of the SLSP (including text, development regulations, figures, tables) and to the various implementing documents of the SLSP including: Spring Lake Design Standards,

Page 163 ends

Affordable Housing Plan, and the CEQA Mitigation Monitoring Program. The project is substantially consistent with the aforementioned documents.

The project has been reviewed for consistency with the Spring Lake Multi-family R-15 Standards.

Building Orientation – Development Standard 3.5 of the Spring Lake Specific Plan Design Standards requires street-facing facades, setbacks, and street orientation for R-15 density units that emulate single-family housing. The small-lot development is a newer design type and is not addressed under the SLSP. This type of community is typically alley-loaded units facing internally onto shared paseos, however, all of the homes next to collector roadways face out to the adjacent Spring Lake neighborhoods with units fronting onto Miekle Avenue and the naturalized drainage area adjacent to Christiansen Circle.

Pedestrian Circulation – the Spring Lake Design Standards require pedestrian access points that are separated from auto circulation routes. Standard 3.3 (d) states that “Pedestrian pathways shall include amenities such as trellises, trees, or other landscaping”. The project provides a central north to south pedestrian paseo with perpendicular access provided midway through each parcel.

Open Space – Development Standard 3.7 states that private recreation amenities for tenants shall be provided in conjunction with open space. Because this project provides for individual lot ownership rather than a tenant-based rental project, private recreation space is provided for each lot in the form of a private space to the side and/or rear of each home. A common area open space is provided at the northwest boundary of the property (Lot A) and connects to larger community greenbelts and parks. A total of 29 percent of the project site is in public open space and 10 percent is in private yard area.

Energy Efficiency - The energy efficiency standards provided in the Spring Lake Development Standard 2.25 requires five percent (5%) of all units to have roof photovoltaic energy systems or other alternative energy systems. However, the project shall be required to meet the 2019 Building, Residential, Building Energy Efficiency Standards, and California Green Building Codes which now requires that all home provide solar. All homes will have rooftop solar as well as other energy efficiency features as described in the project summary.

Fencing - All wood fence footings and foundations shall be constructed of galvanized steel, reinforced concrete, or masonry. No treated wood materials in contact with the ground will be permitted. All wood fencing shall be stained with an opaque or semi-transparent water sealant to prevent water damage and staining. Fencing shall comply with Section 2.9 of the SL Design Standards. The project application fencing diagram illustrates that a 6-foot wooden fence will be installed on the north subdivision boundary. There is minimal grading differential along this northern boundary and the existing fence will be replaced or remain at the property owner's request. On the south subdivision boundary, a 6-foot high masonry privacy wall will extend along most of the length of this side. Additionally, a 36-inch tall black and tubular metal fence will be placed along the walkway fronting the homes that look onto the naturalized drainage area. The drainage area overcrossing will also be flanked on either side with a 36-inch tall decorative concrete split rail fence as illustrated on the attached fencing diagram.

Spring Lake Affordable Housing Plan
The project is subject to the Spring Lake Affordable Housing Plan, a multi-family requirement that requires that either, ten percent (10%) of all multi-family units be affordable to low-income households and twenty percent (20%) of the units be affordable to very low-income households, or that twenty-five percent (25%) of the multi-family units be affordable to very low-income households. Per a prior Affordable Housing Land Dedication Agreement dated April 2005 between Russell Ranch Development and the City of Woodland, the required (20%) very low-income (VLI) multi-family units were transferred from the Heritage Remainder R-15 site to the Terracina at Spring Lake project on Miekle Avenue and Farmers Central Road within Spring Lake. The Ruby Estates R-15 site is still required to provide 10% of the units to low-income households based on the ultimate build-out of the property Based on the remaining affordability requirement, the project will be required to provide 9 affordable units. The applicant is proposing to pay fees in lieu of constructing the affordable housing resulting in an amount as provided in the Development Agreement on a per-lot basis of $3,900, which results in an overall payment of $339,300. This is consistent with per unit in-lieu fees charged on other single-family projects in Spring Lake. The applicant has agreed to pay the total amount in a lump sum payment upfront rather than through incremental payments at the time of building permit issuance for each unit.

Planned Development Overlay and Conditional Use Permit

Page 164 ends

The applicant is requesting a proposed Planned Development (PD) overlay. The purpose of a PD is to allow flexibility in project design where appropriate. The proposal requests an exception from standard setbacks and lot coverage in order to allow the small-lot development with private drives. Setbacks along the project perimeter are consistent with Spring Lake standards.

The proposed Planned Development Overlay will accommodate the City’s planned and desired minimum density of

12.5 units per acre in a detached, single-family configuration. The Planned Development Overlay will allow for reduced setbacks and other modified development requirements to achieve the stated density. The density and smaller homes also lend themselves toward entry-level homebuyers. The single-family detached configuration conforms better with the existing uses surrounding the site as compared to an attached multifamily.

Interior side-by-side homes will provide a minimum 3.5-foot side yard. A reciprocal use easement will allow one home the right to access a portion of the adjacent side yard providing a minimum 5-foot side yard space for each lot. Homes along the western boundary will not utilize the reciprocal easement as they have a 10-foot rear space for private use. Both conditions are illustrated in the exhibits below:

Page 165 ends

Allowing reasonable modifications that will facilitate the infill small-lot product will meet the intent of the Spring Lake Plan to provide a variety of housing types within Spring Lake. This product type may be desirable to those in varying stages of their lives who do not desire a large yard. In addition, this product type can offer an attractive home at a potentially moderate price range. The project as conditioned is consistent with the Spring Lake Specific Plan.

Subdivision Ordinance Consistency
Lot Development –The subject property is 7.03 acres in size. The proposed 87 R-15 lots range in size from 1,943 to 3,073 square feet. A minimum lot width of 35-feet is required for R-15 development. Overall, project lot widths range from approximately 36 to 52 feet with an average width of 37 feet. The Plan does not have a minimum lot depth or lot size requirement.

Lot Width Variation - Development Regulation 2.35.5 states that lot widths along a block shall be varied. The tentative map meets this requirement, as not more than three lots of the same width are located in a row along the public street front on Meikle Avenue.

Block length - Development Regulation 2.34 and Table 2.4 lists the block length in the R-15 zone as 400 feet desirable with a maximum of 500 feet.

As an infill site, the block length has been determined by the location of the internal loop Drive, which split the two parcels into the inner and our loop. Further, the project provides two access driveways off of Meikle Avenue, which provides breaks in the street block.

Bicycle / Pedestrian Access – Development Regulation 2.24 requires access connections for bicycles and pedestrians to open space, parks, and subdivision trails. Internal paseo and walkway connections lead to the immediately adjacent greenbelt on County Road 25A and Christenson Circle. A bike path is also located on the east side of Meikle Avenue. Additionally, the project provides internal paseos and walkways throughout the development for pedestrian access with a footbridge over the western drainage area to adjoining bike and pedestrian greenbelts.

Alley Access Garages – Development Regulation 2.2.3 requires a minimum of 24 feet of backup space. The project drive aisle is 20 feet wide, and each unit is setback a minimum of 5-feet from the alley providing adequate backup space. Backup space for the guest parking spaces is provided at 20-feet. Section 17.116.080 (B) of the Zoning Code allows consideration for modified parking and maneuvering area dimensions subject to review by the Zoning Administrator and Traffic Engineer.

Infrastructure
External curb, gutter, sidewalk, and streetlights are existing and were installed along Meikle Avenue when Heritage Remainder Phase two was built. The approved SLSP Infrastructure Study Report satisfies the SLSP requirements for Water, Drainage, and Sewer Infrastructure Plans.

Page 166 ends

Access:

The project has two access points on Miekle Avenue which connect to County Road 25A. . Each entry is consistent with the City’s Residential Driveway Detail at 24 feet wide. All drive entries include an enhanced pavement treatment to designate entry into the project.

Each unit in the subdivision will have a two-car garage accessed from the private alleyways off the internal loop drive. The public interface to all surrounding roadways will be provided with front-on units to Miekle Avenue and across from Christenson Circle. Each unit will have direct pedestrian access to either the existing exterior sidewalks or internal paseos. The units along the western boundary will be able to access public greenbelts through paseos and/or alley access points.

Water:

Water is available to the site through will be through a connection for domestic water from the existing 8-inch main stub within the northern site entrance, and the existing 8-inch water main tee in Miekle Avenue at the southern site entrance. The water improvements will be owned and maintained by the City. Water mains, water laterals, and water meters installed by the project will be publicly owned and maintained up to and including the meter. All publicly owned and maintained water facilities will be within a public utility easement. Water laterals beyond the meter are considered private. Private water facilities will be constructed in accordance with City Standards.

Sanitary Sewer:

The entire Ruby Estates development will flow to the existing sewer stub connecting to the existing sewer manhole within the Miekle Avenue and Chamberlain Court intersection. Sewer facilities throughout the project will be publicly owned and maintained up to and including the service cleanouts. All publicly owned and maintained sewer facilities will be within a public utility easement.

Storm Drainage
The project site consists of one drainage shed area which ultimately flows to the East Regional Detention Pond, which was designed to accommodate the subject project. The project site runoff will flow to the existing storm drain on Miekle Avenue. The first point of connection will be an existing drain inlet adjacent to the northern entrance to the site and the second connection will be at the southern entrance to another existing drain inlet. Storm drain improvements upstream of the points of connection are to be private and shall be owned/maintained by the HOA.

Storm Water Quality:

Storm water runoff from the project site will be directed to the East Regional Detention Pond (ERP) via the Heritage Parkway Truck storm drain pipe. The East Regional Pond also provides storm water quality improvement for the runoff for this site. As such, consistent with other developments within the East Regional Detention Pond drainage shed, additional storm water quality improvements will not be required within the development.

Homeowners Association
The project development will include the initiation of a Homeowners Association (HOA). The HOA shall be responsible for the maintenance of the privately owned streets, streetlights, and storm drainage. In addition, conditions restrict the use of the two-car garage space for any use other than parking and do not allow recreational vehicle parking. Parking will not be allowed on private alleys The project as conditioned is consistent with the City’s Subdivision Ordinance.

Spring Lake Specific Plan Design Standards for Architectural Review The SLSP Design Standards adopted on May 20, 2003, identify minimum design requirements for development within the Spring Lake area including architectural requirements for the homes and landscaping requirements for public improvements. The project as proposed meets the requirements of the Design Standards.

Architecture/Elevations
The proposed neighborhood design within the Spring Lake Specific Plan incorporates three distinct alley-loaded (including exterior roadway and drainage area facing homes) floor plans with three exterior styles per plan. Special consideration has been given to the design of the corner lot homes with enhanced elevations and the exposure of the yard elevation (right elevation) to the internal loop street. These conditions create an overall neighborhood variety of 9 elevations. The neo-traditional design is a goal of the guidelines, presenting front doors to

Page 167 ends

Miekle Avenue, internal paseos, and the west edge open space. As a multi-family project, the Spring Lake Design Standard does not specifically require a set number of floor plans and elevations. However, this project does provide individual single-family units. To achieve architectural diversity, the Spring Lake Specific Plan Design Standards require three (3) floor plans and sixteen (16) elevations, four (4 per plan) for a subdivision of 76-120 units. The Ruby Estates Development project proposes three floor plans each with three elevation styles for a total of nine (9) elevations. A detailed pre-plot exhibit is included along with details concerning materials and colors for each lot. Similar small-lot development that has previously been approved for the Spring Lake area has provided between 9 to 12 elevations. Landscaping and fencing are included in the Design Package.

The proposed living area of each floor plan varies in square footage from 1,717 square feet to 2,131 square feet.

These homes offer 3 to 4-bedroom configurations. The smaller plan, a three-bedroom, and 2-bathroom unit are located on 30 percent of the lots. Each plan offers a two-car garage, a paseo to the front door, and a covered entry. The applicant has pre-plotted each unit's floor plan and elevation, as shown on the Site Development Plan in order to ensure a balanced mix of units.

Each unit has a minimum 3.5-foot side-yard setback. Each unit’s garage side is proposed as a passive side with the opposite side as the active side with access directly from the unit via a patio door. The passive side of each unit will serve as an extension of the adjacent unit. Each 7-foot wide private patio activity space serves as the private yard area for each home that will be screened by a 5-foot high wood fence.

Each floor plan has two entry locations, one in a more typical location, located off the front of the home, and the other location as a ‘side entry’ location leading to the private open space area. The entry door location varies based on how the home is situated. Homes may ‘front’ onto an internal paseo, an exterior street, or to a naturalized open space area.

A desired intent of the SLSP is to create variety and interest along a street. Toward this end, the applicant has worked to develop architectural styles that provide for significant differentiation. The project includes designs for Spanish, Farmhouse, and Craftsman architectural styles. All the homes have some stucco finish that will be a smoother light sand stucco finish. The following descriptions have been provided by the architect regarding the architectural styles:

Spanish
The Spanish-style homes are distinct with simple massing, low pitched gable roofs with concrete low profile S-tile, stucco walls, and arched portal entries. Some of the specific style details include round pipe gable accents, windows with simple grids, stucco trim, and enhanced sill treatments.

Farmhouse
The Farmhouse homes utilize a more casual cottage look with mainly gable roof lines. A combination of materials, colors, and details are used on the homes. The walls are finished in stucco with vertical board and batten siding accents, the windows are fully trimmed and gables are highlighted with outlookers. Specific style details include corbels, a 4 over 1 window mullion pattern, and enhanced gable end accents.

Craftsman
The Craftsman homes share the tradition of wider eave overhangs, shallow-pitched gabled roofs, and outlookers. The walls are a combination of stucco and horizontal siding. All windows are fully trimmed and utilize a 3 or 2 over 1 mullion pattern.

Landscaping
The project proposes to landscape the site, including both public and private spaces. The public open space will be landscaped as well as interior paseos and patios. The final choice of street trees will be coordinated with the City’s Public Works division prior to issuance of permits and will provide for a mix of species, consistent with city policies. Along Miekle Avenue the City will maintain the parkway landscape strips. However, all areas located back of the sidewalk will be maintained by the HOA.

Appeals
Planning Commission action on the proposed project is advisory and includes a recommendation to the City Council regarding final action. Final action on the project is subject to review and consideration by the City Council at a subsequent public hearing.

Recommendation for Action: Staff recommends that the Planning Commission:

1. Receive the staff report;

Page 168 ends

2. Conduct a public hearing;

3. Adopt the attached Resolution No. PC# 22-07, recommending that the City Council:
a) approve and confirm the use of the previously certified Turn of the Century EIR as the appropriate environmental review document in accordance with CEQA;
b) approve a Planned Development Overlay and Conditional Use Permit; c) approve Tentative Subdivision Map #5221;
d) approve Site Plan and Architectural Design Review, and e) approve the Amended and Restated Development Agreement between the City of Woodland and The New Home Company LLC, to develop the Ruby Estates Development project area located within the Spring Lake Specific Plan Area with Conditions of Approval.

Prepared By: Megan Meier, Associate Planner
Reviewed By: Cindy Norris, Principal Planner
Attachments:

1. Resolution PC 22-07

2. Contextual Map

3. TM General Application Form

4. Ruby Estates Project Narrative

5. Project Information Summary Sheet Ruby Estates

6. PD Overlay Exhibit

7. Tentative Subdivision Map Ruby Estates

8. Geotechnical 12-16-21

9. Ruby Estates Conditions of Approval

10. Landscape Concept Image Boards

11. Fence Diagram

12. Lotting Matrix-Ruby Estates

13. Architectural Design Plan Set

14. Ruby Estates Draft DA

Page 169 ends

RESOLUTION NO. PC 22-07_

RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF

WOODLAND RECOMMENDING THE CITY COUNCIL APPROVAL OF
TENTATIVE SUBDIVISION MAP NO. 5221, PLANNED DEVELOPMENT

AND CONDITIONAL USE PERMIT, AND SITE PLAN AND DESIGN

REVIEW FOR RUBY ESTATES PROJECT IN ACCORDANCE WITH

THE CONDITIONS OF APPROVAL, AND APPROVAL OF AN

ORDINANCE APPROVING A DEVELOPMENT AGREEMENT

BETWEEN THE CITY OF WOODLAND AND THE NEW HOME

COMPANY OF NORTHERN CALIFORNIA LLC
WHEREAS, the applicant, The New Home Company of Northern California LLC of Northern California LLC, filed Planning Application # PLNG 22-00032, proposing a Tentative Subdivision Map (TSM No.5221), Planned Development Standards, Conditional Use Permit, Site Plan and Design Review, and a Development Agreement, to develop 7.03 acres of the Spring Lake R-15 Heritage Remainder Area within Spring Lake (APN:042-030-054); and WHEREAS, the Woodland Planning Commission held a duly noticed public hearing on June 16, 2022, to review and consider recommending to the City Council approval of the proposed Ruby Estates Project in Spring Lake (“Project”) including Tentative Subdivision Map No. 5221, Planned Development Standards, Conditional Use Permit, Site Plan and Design Review, and the Development Agreement; and
WHEREAS¸ pursuant to California state law and the Woodland Municipal Code, public hearing notices were mailed to all property owners within a one thousand-foot (1,000-ft) radius of the subject property, and a public hearing notice was published for a minimum of ten days prior to the public hearing in the Daily Democrat; and
WHEREAS, the proposed project is consistent with the Spring Lake Specific Plan Environmental Impact Report (SCH #99022069, Turn of the Century EIR) certified on August 15, 2000 and adoption of addenda to the Turn of the Century EIR dated December 18, 200, November 19, 2002, December 17, 2002, and April 15, 2003.

WHEREAS, the SLSP requires that each development application include certain projectlevel and project-specific technical analyses to demonstrate consistency with the performance thresholds and requirements of the SLSP and SLSP Mitigation Monitoring Plan (MMP). All the required studies have been submitted for the subject project and reviewed by staff, and the following conclusions have been reached: a) the studies satisfy the SLSP requirements; b) applicable requirements or conditions recommended in the studies have been included in the conditions of approval for the subject project; c) the studies identify no environmental circumstances specific to the subject site or the proposed project that were not previously anticipated and addressed in the original EIR and later addenda; and

Page 170 ends

WHEREAS, the City of Woodland hereby finds that these studies provide the substantial evidence demonstrating that the Project as conditioned is consistent with the adopted Specific Plan and fulfills all conditions and CEQA mitigation measures; therefore, pursuant to Section 65457(a) of the California Government Code and Section 15182(a) of the CEQA Guidelines, no other CEQA clearance is required for the City to take action to approve this Project; and WHEREAS, the Planning Commission has revised all plans and documents regarding the proposed Tentative Subdivision Map 5221, Planned Development Standards and Conditional Use Permit, as well as Site Plan and Design Review providing for complete site development; and WHEREAS, proper notice of this public hearing was given in all respects as required by law; and
WHEREAS, the Planning Commission has reviewed all written evidence and oral testimony presented to date.

NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of Woodland, based on substantial evidence in the administrative record of proceedings and pursuant to its independent review and consideration, does hereby make the following findings, determinations, and recommendations with respect to the proposed General Plan and Specific Plan Amendments, Tentative Subdivision Map, Planned Development, Conditional Use Permit, Site Plan and Design Review for the Project, and the proposed Development Agreement:

The Planning Commission, in recommending to the City Council approval makes the following findings regarding:

1. General Plan Consistency Findings:
a. The project does not require a General Plan Amendment and does not trigger any significant impacts.
b. Overall The Project is consistent with the goals and policies of the General Plan and encourages infill housing development on a remainder parcel in the Spring Lake Specific Plan area.
c. The Project is consistent with the goals and policies of the Housing Element by meeting the requirements of the Spring Lake Affordable Housing Plan as conditioned, and by providing additional housing options by offering a small lot single family product which is not widely represented in the City.

2. Spring Lake Specific Plan Consistency Findings:
a. The Project is consistent with the policy language (goals, policies, and objectives) of the SLSP based upon a detailed analysis performed comparing the Project

Page 171 ends

proposal to each section of the SLSP, and through various conditions or components of the Development Agreement, consistency has been ensured. b. The Project is consistent with the land use summary and other relevant plan text throughout the SLSP in that the project provides a small lot single family product which is a multi-family housing product type encouraged in the Specific Plan. c. The Project is consistent with Development Regulations in the SLSP including a determination of substantial consistency with Regulations 2.6, 6.1, 6.4, and 6.7, which preclude the submittal of final maps until infrastructure plans are completed and tentative maps made consistent, if applicable.
d. The Project as conditioned is consistent with the SLSP design standards and SLSP Affordable Housing Plan.

3. Tentative Subdivision Map Findings concerning Tentative Subdivision Map (No. 5221), Planned Development, and CUP findings:
a. The proposed Tentative Subdivision Map as conditioned is consistent with the City’s General Plan, including the Housing Element, and the Spring Lake Specific Plan. The proposed Tentative Map will implement the General Plan by providing the opportunity for development of small lot for-sale, single family housing within the community. The Tentative Subdivision Map is also consistent with the City’s Community Design Guidelines.
b. The Tentative Subdivision Map depicts a site that is physically suitable for development. There are no conditions that would render the Property unsuitable for residential development.
c. The Project site is physically suitable for the proposed density of development. The site is of a sufficient size and shape to allow the proposed density, and the subdivision will be able to accommodate the future development of residential units given the shape and topography of the Project site.
d. The design of the subdivision or the proposed improvements will not cause substantial environmental damage or substantially and unavoidably injure fish or wildlife or their habitat. The Biological Resources Assessment (Jurisdictional Delineation and Special Status Species, Gibson & Skordal, December 2003) shows that there would not be any significant and unavoidable impacts related to existing habitat. SLSP Mitigation measures regarding biological studies prior to construction activity are required. As part of the SLSP requirements, the project has mitigated for agriculture and hawk habitat
e. The design of the proposed subdivision will not cause serious public health problems and is not anticipated to have any negative impacts on Project residents

Page 172 ends

or occupants of the surrounding area. The project has exceeded requirements for on-site parking.
f. The subdivision design will not conflict with easements acquired by the public at large, any new easements have been made conditions of map approval.

4. The Planning Commission does hereby recommend that the City Council:
a. approve the the previously certified Turn of the Century EIR as the appropriate level of environmental review in accordance with the California Environmental Quality Act (CEQA);
b. approve Tentative Subdivision Map #5221;
c. approve a Planned Development Overlay and Conditional Use Permit; d. approve Site Plan and Design Review; and
e. approve the Development Agreement between the City of Woodland and The New Home Company of Northern California LLC LLC, to use and develop the Ruby Estates project area located within the Spring Lake Specific Plan Area with Conditions of Approval.

PASSED AND ADOPTED by the Planning Commission of the City of Woodland at a regular meeting on the 16th day of June 2022, by the following vote:

AYES:

NOES:

ABSTAIN:

ABSENT:

Marco C. Lizarraga, Chairperson
ATTEST:
_____________
Cindy Norris, Planning Commission Secretary
Attachments:

1. Planning Commission Resolution PC 22-07

2. Contextual Map

3. TM General Application Form

4. Ruby Estates Project Narrative

Page 173 ends

5. Project Information Summary Sheet Ruby Estates

6. PD Overlay Exhibit

7. Tentative Subdivision Map Ruby Estates

8. Geotechnical 12-16-21

9. Conceptual Landscape Diagram

10. Fence Diagram

11. Lotting Matrix-Ruby Estates

12. Architectural Design Plan Set

13. Ruby Estates Draft DA

14. Ruby Estates Conditions of Approval

Page 174 ends

MIEKLE AVENUE COUNTY ROAD 25A GIDDINGS COURT CHAMBERLAIN COURT CHRISTIANSEN CIRCLE 75 74 73 72 76 77 79 78
110
71 125 126
141 HERITAGE REMAINDER AREA - PHASE 1 2015 MB 45
HERITAGE REMAINDER AREA - PHASE 2
2017 MB 82 300' LIMIT LINE CONTEXTUAL MAP RUBY ESTATES Sacramento Office 103/04/2022 JOB NO: OF SHEET DATE: CCLESG SCALE CHECKED BY: DRAWN BY: DESIGNED BY: 1" = 200' 1 CITY OF WOODLAND CALIFORNIA 1863.10.03 Project Planning Civil Engineering Landscape Architecture 2940 Spafford Stret, Suite 20 Davis, CA 95618 (530) 758-2026 2120 20th Street, Suite Three Sacramento, CA 95818 (916) 455-2026 CECWEST.COM Davis Office ZONING BOUNDARIES SUBJECT PROPERTY LEGEND: LOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIAL PUBLIC/QUASI PUBLIC ZONE: R-15 (EXISTING) R-15 WITH P/D OVERLAY (PROPOSED) SPRING LAKE SP (PROPOSED RUBY ESTATES SUBDIVISION) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 1) ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 2) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 2) ZONE: A-N YOLO COUNTY BANKS DRIVE MURPHY DRIVE ZONE: P-QP SPRING LAKE SP WOODLAND JOINT UNIFIED SCHOOL DISTRICT ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 1) GENERAL PLAN LAND USE DESIGNATIONS OPEN SPACE

Page 175 ends
Page 176 ends
Page 177 ends
Page 1 of 5 ends

Ruby Estates
Project Narrative
Prepared 10-March-2022
The Ruby Estates project is a proposed new, in-fill residential subdivision located at the northwest corner of the Miekle Avenue and County Road 25A intersection within the Spring Lake Specific Plan (SLSP) area in the City of Woodland. The subdivision includes a total of 88 single family lots, open space parcels and related street and utility improvements.

The subject site is currently undeveloped. The applicant proposes to achieve a density for the site of 12.5 units per acre with a single family detached product. The proposed density of 12.5 units per acre falls at the mid-point of the R-15 zoning range of 10-15 units per acre. To achieve said density, a Planned Development Overlay is being requested. The streets and storm drain improvements within the subdivision are intended to be privately owned and maintained by an HOA established for the development. One of the main goals of the proposed project is to provide a single family detached housing product within the current R-15 zoning district, thereby creating a detached product for entry level home buyers.

Requested Entitlements
The requested entitlements include:
• Tentative Subdivision Map
• A Planned Development Overlay to integrate modified development requirements (i.e. reduced setbacks, private streets, side yard access easements) to accommodate the density envisioned for the property
• Design Review
• Confirmation of the previously certified EIR for the Spring Lake Specific Plan which included the subject site
• Development Agreement
• Request for the abandonment of approximately 170 square feet of road right-of-way at the Miekle Avenue/County Road 25A intersection
History
The subject site is approximately 7.03 acres and is currently vacant / undeveloped. Historically, the property was used for agriculture.

Physical Features
The property is an in-fill project surrounded by existing development. It is bordered by the existing Heritage Remainder Area Phase 1 subdivision to the north, Miekle Avenue to the east, Christiansen Circle and adjacent drainage swale to the west, and County Road 25A (future) to the south. The site is southwest of the Spring Lake Elementary School and just over a mile east of Highway 113. The existing project site is primarily pervious.

Page 178 ends
Page 2 of 5 ends

Proposed Development
Subdivision Layout:

The layout of the proposed subdivision includes a total of 88 single-family lots with lot sizes that range from approximately 1,900 SF to 3,000 SF (exclusive of the front walkways and paseos). The two-car garages for the homes are alley loaded while the front door to each home is accessed off paseos located throughout the subdivision. The proposed setbacks will be 3.5-feet on either side, 4-feet to the rear of the garage/house, and 4 feet from the front of the house to the paseo open space parcel. Houses along Miekle Avenue will front onto Miekle Avenue to create an attractive street scene with alley loaded garages in the rear. The front yard setbacks along Miekle Avenue will be a minimum of 10 feet.

The alley loaded home configuration coupled with the proposed setbacks establishes the need for 4-foot-long driveways that do not provide parking outside of the garage. Additionally, the side yards will be shared between lots to provide a larger area for waste receptacle storage and useable, private outdoor space. The applicant is requesting that approximately 170 SF of City right-of-way be abandoned on the northwest corner of the Miekle Avenue/County Road 25A intersection to create a more desirable lot configuration for the proposed home on Lot 88.

Lot A has been proposed as an open space parcel for the project providing a pergola and bench as shown in the enclosed landscape exhibits, as well as providing connectivity to the open space/drainage channel and existing subdivision to the west. This parcel along with the other lettered lots that comprise the paseos, pass-throughs, and shared walkway (providing access to the front doors of the homes on the western edge of the project site) account for approximately 15,500 SF of common space. Lastly, two items are to be built along with this subdivision per the Spring Lake Capital Improvement Plan and will be eligible for reimbursement and/or credits for Spring Lake Infrastructure Fees (SLIF). These items include a 6-foot masonry privacy wall that will extend along most of the southern subdivision boundary, and the completion of the traffic signal at County Road 25A and County Road 102.

Circulation / Parking: There will be two vehicle ingress/egress points for the site, both off Miekle Avenue. The loop street and alleys within the subdivision (Lot C) will be privately owned and maintained by the HOA. Vehicular parking for guests is provided at the end caps of the lots within the subdivision and accessed from the loop road. A total of 59 onsite guest parking spaces are provided. Miekle Avenue and Christiansen Circle also have on-street parking. Two vehicular parking spaces are also provided within the garage of each unit.

Two pedestrian connections (Lots A & B) are proposed along the western edge of the site to provide connectivity to the Oyang South subdivision located west of Christiansen Circle. A pedestrian path will also be provided in the southwest corner of the site to provide connectivity to pathway along the north side of County Road 25A.

Page 179 ends
Page 3 of 5 ends

Waste Receptacles: Three receptacle toters are provided for each residence. The placement of the toters for pick-up is proposed at the face of the garage of each residence. Refer to the enclosed exhibit for locations and truck turning exhibits.

Side-yard Easements: The lots will have a burden and/or a benefit easement along the side-yards of the single family lots to create more usable space for the residents as well as space for waste receptacle storage. Refer to the enclosed exhibit for a typical representation of the easement areas.

Architectural Design
Our new neighborhood design within the Spring Lake Specific Plan incorporates three distinct alley-loaded floor plans with three exterior styles per plan. Special consideration has been given to the design of the corner lot homes with the exposure of the yard elevation (right elevation) to the internal loop street. These conditions create an overall neighborhood variety of 18 elevations. The neo-traditional design is a goal of the guidelines, presenting front doors to Miekle Avenue, internal paseos and the west edge open space.

FARMHOUSE
The Farmhouse homes utilize a more casual cottage look with mainly gable roof lines. The walls are finished in stucco with vertical board and batten siding accents, the windows are fully trimmed and gables are highlighted with outlookers. Specific style details include corbels, a 4 over 1 window mullion pattern, and enhanced gable end accents.

CRAFTSMAN
The Craftsman homes share the tradition of wider eave overhangs, shallow pitched gabled roofs, and outlookers. The walls are a combination of stucco and horizontal siding. All windows are fully trimmed and utilize a 3 or 2 over 1 mullion pattern.

SPANISH
The Spanish style homes are distinct with simple massing, low pitched gable roofs with concrete low profile S-tile, stucco walls, and arched portal entries. Some of the specific style details include round pipe gable accents, windows with simple grids, stucco trim and enhanced sill treatments.

Utility Design
Water: Points of connection for domestic water will be from the existing 8-inch main stub within the northern site entrance, and the existing 8-inch water main tee in Miekle Avenue at the southern site entrance. The water improvements will be owned and maintained by the City.

Page 180 ends
Page 4 of 5 ends

Sanitary Sewer: The entire Ruby Estates development will flow to the existing sewer stub connecting to the existing sewer manhole within the Miekle Avenue and Chamberlain Court intersection. The sewer improvements will be owned and maintained by the City.

Storm Drainage: The project site consists of one drainage shed area which ultimately flows to the East Regional Detention Pond, which was designed to accommodate the subject project. The project site runoff will flow to the existing storm drain in Miekle Avenue. The first point of connection will be an existing drain inlet adjacent to the northern entrance to the site and the second connection will be at the southern entrance to another existing drain inlet. Storm drain improvements upstream of the points of connection are to be private and shall be owned/maintained by the HOA.

Storm Water Quality: Storm water runoff from the project site will be directed to the East Regional Detention Pond via the Heritage Parkway Truck storm drain pipe. The East Regional Pond also provides storm water quality improvement for the runoff for this site. As such, consistent with other developments within the East Regional Detention Pond drainage shed, storm water quality improvements will not be required within the development.

Affordable Housing Plan
The in-lieu fee option is intended to be utilized to satisfy the low-income affordable housing requirement for the single-family lots. The very low-income requirement was previously met by the master developer of the Heritage Subdivision, which the project is contained within.

Environmental Review
The impacts of the proposed project were already considered in the previously approved Environmental Impact Report prepared as part of the Spring Lake Specific Plan. This property previously participated in the creation of mitigation easements for the loss of ag land and Swainson’s Hawk foraging habitat.

Justification
The proposed project is justified for the following reasons:
• The proposed project is consistent with the city’s general plan, the Spring Lake Specific Plan and the current R-15 zoning.
• The site is consistent with the SLSP density, and the desired unit count and guest parking as expressed in previous preliminary meetings with City staff. • The site is ideal for providing increased housing opportunities, given its close proximity to the existing Spring Lake Elementary School, Rick Gonzalez Park, and other public services. • The proposed Planned Development Overlay will accommodate the City’s planned and desired minimum density of 12.5 units per acre in a detached, single-family configuration.

The Planned Development Overlay will allow for reduced setbacks and other modified development requirements to achieve the stated density. The density and smaller homes also lend themselves toward entry level homebuyers. The single-family detached configuration conforms better with the existing uses surrounding the site as compared to an attached multiPage 181

Page 5 of 5 ends

story, multi family structure(s). The proposed density of 12.5 units per acre is consistent with the anticipated development density / impact fee generation necessary to amortize the cost of the Spring Lake infrastructure in the Spring Lake CFD. Therefore, the project helps complete the installation and/or generates fees to pay for planned and existing infrastructure within the SLSP.

Page 182 ends

PROJECT INFORMATION SUMMARY SHEET
Spring Lake Specific Plan, Parkside 3 Project (PLNG 22 -00007) – Request to approve a Tentative Subdivision Maps (TSM #5221) a Zoning Amendment to allow Planned Development Overlay, a Conditional Use Permit, Site Plan and Design Review, and a Development Agreement for a parcel of land located within the Spring Lake Specific Plan Area to allow development of 87 single-family lots, consistent with the Medium Density General Plan land use designation and multi-family R-15 specific plan designation for the property. APN: 042-030-054 Location: The subject parcel (APN 042-030-054, 7.03 acres) is located at the northwest corner of Miekle Avenue and County Road 25A. The subject properties are located within the original Heritage Remainder Tentative Subdivision Map 5048 approved on June 13, 2014.

Applicant/Owner:

Applicant: Ruby Realty Investors, LLC, 1480 Moraga Road Suite C103, Moraga CA, 94556 Owner: The New Home Company 1508 Eureka Road, Suite 290, Roseville CA, 95661 Environmental Review: The project is consistent with the Environmental Impact Report (SCH #99022069, Turn of the Century EIR) on the Spring Lake Specific Plan certified on August 15, 2000 and with prior addenda to the Turn of the Century EIR. The proposed project, which result in a fewer number of residential units than originally contemplated, will result in environmental impacts that are similar to those identified in the previous EIR. Infrastructure improvements beyond those previously anticipated will not be required. The proposed project will result in a similar number of residential units, as contemplated in the original EIR, and will result in environmental impacts similar to those identified in the previous EIR.

APN: APN 042-030-054, 7.03 acres
Project Planner: Megan Meier, Associate Planner
Staff Recommendation: Recommend City Council Approval with Conditions Report For: Planning Commission Public Hearing, June 16, 2022 General Plan Designation: Medium Density (8.1 – 19.9 DU/Gross Acre) Current Zoning: Multi- Family/R-15 (10-15 DU/Acre)
Specific Plan Designation: Spring Lake Specific Plan
Existing Land Uses: Vacant/ Existing curb, gutter, sidewalk, and street lights.

Page 183 ends

Flood Zone: Flood Zone X – Area Outside the 2% Annual Chance Flood Event, FIRM Community Panel Number – 060426-0445H Revised May 16, 2002 Street Access: Miekle Avenue via County Road 25A
Adjacent Land Uses & Zoning:

Direction Land Use Zoning
North Existing Single Family Homes R-4
South County Road 25 A &
Agriculture
County
East Existing Single Family Homes R-4
West Existing Single Family Homes R-4
Applicable Laws, Codes & Ordinances:

This project is subject to several laws, codes and ordinances:
 The City of Woodland General Plan
 The City of Woodland Zoning Ordinance
 California Environmental Quality Act (CEQA)
 Spring Lake Specific Plan (SLSP)
 SLSP Mitigation Monitoring Plan (MMP)
 SLSP Affordable Housing Plan

Page 184 ends

MIEKLE AVENUE COUNTY ROAD 25A GIDDINGS COURT CHAMBERLAIN COURT CHRISTIANSEN CIRCLE 75 74 73 72 76 77 79 78
110
71 125 126
141 HERITAGE REMAINDER AREA - PHASE 1 2015 MB 45
HERITAGE REMAINDER AREA - PHASE 2
2017 MB 82 BANKS DRIVE MURPHY DRIVE ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 1) ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 2) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 2) AG YOLO COUNTY ZONE: P-QP SPRING LAKE SP WOODLAND JOINT UNIFIED SCHOOL DISTRICT ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 1) MIEKLE AVENUE COUNTY ROAD 25A GIDDINGS COURT CHAMBERLAIN COURT CHRISTIANSEN CIRCLE 75 74 73 72 76 77 79 78
110
71 125 126
141 HERITAGE REMAINDER AREA - PHASE 1 2015 MB 45
HERITAGE REMAINDER AREA - PHASE 2
2017 MB 82 BANKS DRIVE MURPHY DRIVE ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 1) ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 2) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 2) AG YOLO COUNTY ZONE: P-QP SPRING LAKE SP WOODLAND JOINT UNIFIED SCHOOL DISTRICT ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 1) PLANNED DEVELOPMENT OVERLAY EXHIBIT RUBY ESTATES Sacramento Office 103/04/2022 JOB NO: OF SHEET DATE: CCLESG SCALE CHECKED BY: DRAWN BY: DESIGNED BY: 1" = 250' 1 CITY OF WOODLAND CALIFORNIA 1863.01.03 Project Planning Civil Engineering Landscape Architecture 2940 Spafford Stret, Suite 20 Davis, CA 95618 (530) 758-2026 2120 20th Street, Suite Three Sacramento, CA 95818 (916) 455-2026 CECWEST.COM Davis Office ZONE: R-15 ZONE: R-15 WITH P/D OVERLAY SPRING LAKE SP 7.03 ACRES SPRING LAKE SP (PROPOSED RUBY ESTATES SUBDIVISION) 7.03 ACRES EXISTING PROPOSED

Page 185 ends

Project Planning Civil Engineering Landscape Architecture 2940 Spafford Street, Suite 200 Davis, CA 95618
(530) 758-2026
2120 20th Street, Suite Three
Sacramento, CA 95818
(916) 455-2026
Sacramento Office Davis Office
CECWEST.COM RUBY ESTATES
TENTATIVE MAP NO. 5221 3 COUNTY ROAD 25A

STREET & LOTTING PLAN
1 PARKLAND AVE

PROMENADE
AVE HERITAGE PARKWAY MEIKLE DRIVE FARMER'S CENTRAL RD 25-A COUNTY COUNTY ROAD 102
HARRY LORENZO AVE COUNTY ROAD EAST GIBSON ROAD ROAD 25

PIONEER
STATE HIGHWAY 113 PROJECT LOCATIONVICINITY MAP NOTES: CABLE TELEVISION: ELECTRICITY & GAS: SEWER & DRAINAGE: DOMESTIC WATER, SANITARY PROPOSED ZONING: EXISTING ZONING: AREA: PARCEL NUMBERS & APN's: CIVIL ENGINEER: OWNER: GENERAL NOTES FLOOD ZONE DESIGNATION: MINIMUM RADIUS AT FACE OF CURB PUBLIC / QUASI PUBLIC LOT SUMMARY 20' 9.5' LOOP ROAD TO LOOP ROAD ALLEY TO LOOP ROAD INTERSECTION TYPE INTERSECTION CURB RADII TABLE SHEET INDEX PROJECT PHASING LOT SIZES LEGEND: SPRING LAKE SPECIFIC PLAN BOUNDARY EXISTING USE: TOTALS: 7.03 AC. MEDIUM DENSITY RESIDENTIAL / SLSP R-15 (10-15 DU/AC) PRIVATE ROADWAYS (LOT C) SUBDIVISION TRAIL & WALKWAYS / PASEOS 7.03 AC. 0.0 AC. 0.0 AC. 4.78 AC. 1.84 AC. 0.41 AC. 7.03 AC. LOT A SUBDIVISION TRAIL CORRIDORS LOT B, D-O SUBDIVISION WALKWAYS / PASEOS LOT C PRIVATE ROADWAYS & VISITOR PARKING FIRE: STREET & LOTTING PLAN GRADING, DRAINAGE, & UTILITIES PLAN PARKING, CIRCULATION, & WASTE RECEPTACLE PLAN 1 2
3 GENERAL PLAN LAND USE / ZONING DESIGNATION EXISTING AREA PROPOSED AREA LAND USE COMPARISON CHART ZONING SLSP R-15 (10-15 DU/AC) EXISTING SPECIFIC PLAN 70 - 105 UNITS PERMITTED AREA # UNITS 7.03 AC. 87 PROPOSED TENTATIVE SUBDIVISION MAPPROPOSED DENSITY 12.38 DU/AC C
2 A
2 2
B LOTTING MIX COUNT PLAN 1 PLAN 2 PLAN 3 TOTAL 26 33 28 87

MIEKLE AVENUE GIDDINGS COURT CHAMBERLAIN COURT
CHRISTIANSEN CIRCLE DEVELOPER: LOT SETBACKS

10.0' 4.0'

3.5' 4.0' 4.0'

3.5' 4.0' 4.0'

10.0'

3.5'

3.5' LOT 87 R.O.W. ABANDONMENT PLANNED DEVELOPMENT SETBACKS TYPE PROPOSED MIN. SETBACKS MIN. R-15 SETBACKS PER SPRING LAKE SPECIFIC PLAN FRONT YARD 4' TO PORCH 4' TO HOUSE 4' TO GARAGE 10' TO PORCH 10' TO HOUSE 20' TO GARAGE REAR YARD 4' TO HOUSE 10' TO HOUSE SIDE YARD 3.5' TO HOUSE 3.5' TO GARAGE 5' TO INTERIOR 10' TO STREET 4.0' LAND USE SUMMARY EXISTING / PROPOSED GENERAL PLAN LAND USE: SUBDIVISION MAP NUMBER: AREA 7.03 AC. AFFORDABLE HOUSING UNITS D
2 2
E

PRIVATE DRIVE PRIVATE WAY A

PRIVATE WAY B

PRIVATE WAY C

PRIVATE WAY D

PRIVATE WAY E

PRIVATE WAY F

PRIVATE WAY G

PRIVATE WAY H

PRIVATE LANE A

PRIVATE LANE B
PRIVATE LANE C PRIVATE DRIVE PRIVATE DRIVE HERITAGE REMAINDER PHASE 1

Page 186 ends

LOT 22 PAD=42.2 LOT 23 PAD=42.1 LOT 24 PAD=42.0 LOT 19 PAD=41.9 LOT 20 PAD=42.0 LOT 21 PAD=42.1 LOT 18 PAD=41.9 LOT 17 PAD=41.8 LOT 16 PAD=41.6 LOT 15 PAD=41.7 LOT 14 PAD=41.6 LOT 13 PAD=41.5 LOT 10 PAD=41.7 LOT 11 PAD=41.8 LOT 12 PAD=41.8 LOT 7 PAD=41.8 LOT 8 PAD=41.8 LOT 9 PAD=41.8 LOT 6 PAD=41.7 LOT 5 PAD=41.7 LOT 4 PAD=41.7 LOT 1 PAD=41.4 LOT 2 PAD=41.6 LOT 3 PAD=41.6 LOT 59 PAD=41.7 LOT 60 PAD=41.9 LOT 61 PAD=42.1 LOT 62 PAD=42.0 LOT 63 PAD=41.9 LOT 58 PAD=42.1 LOT 57 PAD=42.2 LOT 56 PAD=42.2 LOT 55 PAD=42.0 LOT 54 PAD=41.8 LOT 49 PAD=41.7 LOT 50 PAD=41.8 LOT 51 PAD=41.9 LOT 52 PAD=42.0 LOT 53 PAD=42.2 LOT 48 PAD=42.0 LOT 47 PAD=41.9 LOT 46 PAD=41.8 LOT 45 PAD=41.7 LOT 44 PAD=41.6 LOT 39 PAD=41.4 LOT 40 PAD=41.6 LOT 41 PAD=41.8 LOT 42 PAD=41.9 LOT 43 PAD=42.1 LOT 38 PAD=42.1 LOT 37 PAD=42.0 LOT 36 PAD=41.8 LOT 35 PAD=41.6 LOT 30 PAD=42.0 LOT 31 PAD=42.1 LOT 32 PAD=42.3 LOT 33 PAD=42.4 LOT 34 PAD=42.6 LOT 67 PAD=42.6 LOT 68 PAD=42.7 LOT 70 PAD=42.3 LOT 71 PAD=42.5 LOT 69 PAD=42.9 LOT 72 PAD=42.7 LOT 66 PAD=43.0 LOT 65 PAD=42.8 LOT 64 PAD=42.6 LOT 29 PAD=42.5 LOT 28 PAD=42.6 LOT 27 PAD=42.4 LOT 26 PAD=42.2 LOT 25 PAD=42.0 LOT 73 PAD=42.3 LOT 74 PAD=42.4 LOT 75 PAD=42.6 LOT 78 PAD=42.7 LOT 77 PAD=42.5 LOT 76 PAD=42.3 LOT 85 PAD=41.8 LOT 86 PAD=41.9 LOT 87 PAD=41.9 LOT 84 PAD=42.4 LOT 83 PAD=42.2 LOT 82 PAD=42.1 LOT 79 PAD=42.5 LOT 80 PAD=42.6 LOT 81 PAD=42.8 41.5 41.4 41.6 41.5 41.6 41.8 42.0 42.2 Project Planning Civil Engineering Landscape Architecture 2940 Spafford Street, Suite 200 Davis, CA 95618
(530) 758-2026
2120 20th Street, Suite Three
Sacramento, CA 95818
(916) 455-2026
Sacramento Office Davis Office
CECWEST.COM RUBY ESTATES
TENTATIVE MAP NO. 5221 3 SECTION A SECTION C SECTION B EARTHWORK SUMMARY COUNTY ROAD 25A

MIEKLE AVENUE GIDDINGS COURT CHAMBERLAIN COURT

CHRISTIANSEN CIRCLE
2 GRADING, DRAINAGE, & UTILITIES PLAN LEGEND: LOT XX PAD=XX.X XX.X SECTION D SECTION E HERITAGE REMAINDER PHASE 1

Page 187 ends

Project Planning Civil Engineering Landscape Architecture 2940 Spafford Street, Suite 200 Davis, CA 95618 (530) 758-2026 2120 20th Street, Suite Three Sacramento, CA 95818 (916) 455-2026 Sacramento Office Davis Office CECWEST.COM RUBY ESTATES TENTATIVE MAP NO. 5221 3 PARKING, CIRCULATION, & WASTE RECEPTACLE PLAN 3 MIEKLE AVENUE

GIDDINGS
COURT

CHAMBERLAIN

COURT CHRISTIANSEN CIRCLE

GUEST PARKING SUMMARY
UNITS

PROPOSED ONSITE

PARKING SPACES

GUEST PARKING
RATIO
87 59 0.68 SPACES/UNIT

ONSITE PERPENDICULAR

PARKING STALLS DETAIL
LEGEND:

COUNTRY ROAD 25A

PROPOSED FIRE TRUCK PROFILE

PROPOSED PASSENGER PICK-UP TRUCK PROFILE

PROPOSED PASSENGER SUV PROFILE
HERITAGE REMAINDER PHASE 1

Page 188 ends

December 16, 2021
Mr. Justin Walters
Vice President, Project Management and Development
The New Home Company
1508 Eureka Road, Suite 290
Roseville, California 95661
Geotechnical Engineering Report Update
RUBY ESTATES (HERITAGE PARCEL 4)
Sheldon Road and Power Inn Road
Elk Grove, California
WKA No. 4630.2113421.0100

INTRODUCTION
As authorized, we have prepared this report update for the undeveloped property designated as Parcel 4 within the Heritage residential development in Woodland, California. Wallace-Kuhl & Associates (WKA), Inc. previously prepared a Geotechnical Engineering Report (WKA, Inc. No. 4159.09, dated June 15, 2004) for the Heritage residential development, which included the referenced village. Following completion of the Geotechnical Engineering Report, WKA prepared a Geotechnical Engineering Report Update (WKA No. 9523.06, dated January 16, 2014). Since completion of the 2014 Geotechnical Engineering Report Update, the following geotechnical reports have been prepared for the site by others:  Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 prepared for the project by Geocon Consultants, Inc. (Geocon) dated August 27, 2021 (Geocon Project No. S2028-05-01).  Preliminary Geotechnical Feasibility Assessment – Proposed Residential Development – Ruby Estates prepared by Quantum Geotechnical, Inc. (Quantum) dated September 23, 2021 (Quantum Project No. H055.G).

The purpose of this update has been to evaluate the applicability of the referenced reports prepared for the planned construction at the referenced village (Parcel 4) and to update the reports to reflect changes in the applicable building code and in the practice of geotechnical engineering since the original report was issued.

Page 189 ends

Geotechnical Engineering Report Update Page 2

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Our scope of services has included:  a site reconnaissance;  review of the referenced WKA, Inc, WKA, Geocon, and Quantum geotechnical reports;  engineering analyses; and,  preparation of this report update. Project Background and Proposed Improvements Since the 2004 Geotechnical Engineering Report was completed, residential construction associated with the Heritage development was performed in the vicinity of Parcel 4; however, Parcel 4 has remained vacant. Based on our experience in the area and review of historical photographs, the site has been used as a fill source and to stockpile excess material from surrounding developments since at least August of 2006 until at least February of 2018. Review of the 2021 Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 report indicates the upper two to four feet of soil across the site consists of undocumented fill.

We understand development of the site will consist of residential construction with one- or two- story, wood-framed, single-family structures with an interior slab-on-grade lower floor (posttensioned foundation system). Below-grade basements for the residential structures are not planned. Structural loads for the residential structures are anticipated to be relatively light based on this type of construction.

Associated development will include construction of asphalt concrete roadways, concrete sidewalks, residential landscaping, underground utilities, exterior flatwork and driveway slabs.

The planned development is consistent with previous developments in the vicinity of the site and as noted in the referenced geotechnical reports.

Site Description
In December of 2021, an engineer from our firm visited the subject site. At the time of our site visit, the site was vacant and covered with a sparse growth of volunteer grass and weeds.

Standing water was observed throughout the site.

The site is bound to the north and east by residential development, to the south by vacant property and to the west by a drainage ditch, beyond which is residential development. The drainage ditch appears to be about two to four feet lower in elevation than the surrounding ground surface.

Page 190 ends

Geotechnical Engineering Report Update Page 3

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021

CONCLUSIONS AND RECOMMENDATIONS
Based on review of the referenced geotechnical reports for the Heritage residential development, our recent observations, and understanding of the planned construction, we conclude that the recommendations contained in the 2004 Geotechnical Engineering Report and 2014 Geotechnical Engineering Report Update remain generally applicable for design and construction of the planned residential structures and associated improvements, with the following amended conclusions and recommendations. The 2014 Geotechnical Engineering Report Update, which includes the 2004 Geotechnical Engineering Report, and 2021 Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 are attached to this update. 2019 California Building Code Seismic Design Parameters The 2019 California Building Code (CBC) references the American Society of Civil Engineers (ASCE), Minimum Design Loads and Associated Criteria for Buildings and Other Structures 7- 16. To assist with the structural design of the project, we have provided seismic design parameters for the 2019 CBC which have been determined based on the site location and the web interface developed by the Structural Engineers Association of California (SEAOC) and the Office of Statewide Health Planning and Development (OSHPD) (https://seismicmaps.org).

Since S1 is greater than 0.2g, the 2019 CBC coefficient values Fv, SM1, and SD1 presented are valid for seismic design, provided the requirements in Exception Note 2 in Section 11.4.8 of ASCE 7-16 apply, specifically if T≤ 1.5TS. In our experience, the planned residential buildings will meet Exception Note 2 of ASCE 7-16. However, the project structural engineer should verify the exception is met.

TABLE 1: 2019 CBC/ASCE 7-16 SEISMIC DESIGN PARAMETERS
Latitude: 38.6416° N
Longitude: 121.7374° W
ASCE 7-16
Table/Figure
2019 CBC
Figure/Section/Table
Factor/
Coefficient
2019 CBC
Values

0.2-second Period MCER Figure 22-1 Figure 1613.2.1(1) SS 0.891 g

1.0 second Period MCER Figure 22-2 Figure 1613.2.1(2) S1 0.328 g Soil Class Table 20.3-1 Section 1613.2.2 Site Class D
Site Coefficient Table 11.4-1 Table 1613.2.3(1) Fa 1.144 Site Coefficient Table 11.4-2 Table 1613.2.3(2) Fv 1.972* Adjusted MCE Spectral Response Parameters
Equation 11.4-1 Equation 16-36 SMS 1.019 g
Equation 11.4-2 Equation 16-37 SM1 0.647 g*

Page 191 ends

Geotechnical Engineering Report Update Page 4

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Latitude: 38.6416° N
Longitude: 121.7374° W
ASCE 7-16
Table/Figure
2019 CBC
Figure/Section/Table
Factor/
Coefficient
2019 CBC
Values
Design Spectral
Acceleration Parameters
Equation 11.4-3 Equation 16-38 SDS 0.679 g
Equation 11.4-4 Equation 16-39 SD1 0.431 g* Seismic Design Category Table 11.6-1 Table 1613.2.5(1) Risk Category
I to IV D
Table 11.6-2 Table 1613.2.5(2) Risk Category
I to IV D
Notes: MCER = Risk-Targeted Maximum Considered Earthquake; g = gravity * = The value is valid provided the requirements in Exception Note No. 2 in Section 11.4.8 of ASCE 7-16 are met.

Based on the soil, groundwater, and geology conditions of the site, liquefaction is not anticipated to affect the proposed improvements and does not need to be accounted for in design.

Site Clearing and Subgrade Preparation
As noted previously, about two to four feet of undocumented fill has been placed across the site.

The undocumented fill is not considered suitable for support of the proposed improvements in its current condition. Therefore, the undocumented fill will need to be removed and replaced as engineered fill in accordance with the recommendations of this report.

Existing surface organics within construction areas should be stripped from the site. Strippings maybe stockpiled for later use or disposed of offsite. Debris from the stripping should not be used in general fill construction areas supporting structures or pavements. With the prior approval of the Geotechnical Engineer, strippings may be used in landscape areas, provided they are kept at least five feet from the building pad and other surface improvements, moisture conditioned, and compacted. Discing of the organics into the surface soils may be a suitable alternate to stripping, depending on the condition and quantity of the organics at the time of grading. The decision to utilize discing in lieu of stripping should be made by the Geotechnical Engineer, or his representative, at the time of earthwork construction. Discing operations, if approved, should be observed by the Geotechnical Engineer, or his representative, and be continuous until the organics are adequately mixed into the surface soils to provide a compactable mixture of soil containing minor amounts of organic matter. Pockets or concentrations of organics will not be allowed.

Following site clearing activities, the site should be over-excavated to a depth of at least three feet below existing grades. the exposed subgrade following removal of the upper three feet should be evaluated by our representative to determine if additional over-excavation is required.

The over-excavation should extend at least five feet beyond the edge of proposed improvements, where possible. Any debris exposed by the required over-excavation should be

Page 192 ends

Geotechnical Engineering Report Update Page 5

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
removed and the resulting excavations should be restored to grade with engineered fill placed and compacted in accordance with the recommendations in this report. The lateral extents of the required over-excavation should be clearly marked on the final grading plans. We recommend construction bid documents contain a unit price (price per cubic yard) for additional excavation due to deeper undocumented fill and/or the presence of unsuitable materials and replacement with engineered fill.

The Geotechnical Engineer should be given the opportunity to review the final grading plan to determine if the intent of the over-excavation recommendation has been properly implemented.

Following over-excavation operations, the upper 12 inches of the exposed subgrade should be scarified, moisture conditioned to at least the optimum moisture content, and compacted to at least 90 percent of the American Society of Testing and Materials (ASTM) D1557 maximum dry density.

The resulting over-excavation should be restored with engineered fill placed and compacted in accordance with Engineered Fill Construction section of this report.

Compaction of all subgrade soils should be performed using a heavy, self-propelled, sheepsfoot compactor capable of achieving the required compaction and must be performed in the presence of the Geotechnical Engineer’s representative who will evaluate the performance of subgrade under compactive load. Difficulty in achieving subgrade compaction may be an indication of loose, soft or unstable soil conditions that could require additional excavation. If these conditions exist, additional subgrade stabilization recommendations may be required at the time of construction.

Engineered Fill Construction
Engineered fill consisting of on-site or import materials should be placed in lifts not exceeding six inches in compacted thickness, with each lift being thoroughly moisture conditioned to at least two percent above the optimum moisture content, maintained in that condition, and uniformly compacted to at least 90 percent relative compaction based on the maximum dry density per ASTM D1557. From a geotechnical standpoint, the on-site soils encountered at the site are considered suitable for use as engineered fill provided that they do not contain significant quantities of organics, rubble and deleterious debris, are at a proper moisture content to achieve the desired degree of compaction.

Imported fill materials, if required, should be compactable, well-graded, granular soils with an Expansion Index of 20 or less when tested in accordance with ASTM D4829, and should not contain particles greater than three inches in maximum dimension.

Page 193 ends

Geotechnical Engineering Report Update Page 6

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
In addition, with the exception of imported aggregate base and bedding/initial fill materials for underground utilities, we recommend that the contractor provide appropriate documentation for all imported fill materials that designates the import materials do not contain known contaminants per Department of Toxic Substances Control’s guidelines for clean fill, and have corrosion characteristics within acceptable limits. Imported soils should be approved by the Geotechnical Engineer prior to being transported to the site. The upper six inches of the final pavement subgrade should be uniformly compacted to at least 95 percent of the ASTM D1557 maximum dry density at a moisture content of at least the optimum moisture and must be stable under construction traffic prior to placement of aggregate base, after construction of underground utilities is complete. The proof-roll should be observed by a representative of the Geotechnical Engineer.

Subgrades for support of all concrete slabs-on-grade and pavements should be protected from disturbance or desiccation until covered by capillary break material or aggregate base.

Disturbed subgrade soils may require additional processing and recompaction, depending on the level of disturbance.

Permanent excavation and fill slopes, if any, should be constructed no steeper than two horizontal to one vertical (2H:1V) and should be vegetated as soon as practical following grading to minimize erosion. As a minimum, the following erosion control measures should be considered: placement of straw bale sediment barriers or construction of silt filter fences in areas where surface run-off may be concentrated.

All earthwork operations should be accomplished in accordance with the recommendations contained within this report and the approved plans and specifications. We recommend the Geotechnical Engineer’s representative be present on a regular basis during all earthwork operations to observe and test the engineered fill and to verify compliance with the recommendations of this report and the project plans and specifications.

From a geotechnical standpoint, the on-site soils encountered at the site are considered suitable for use as engineered fill provided that they do not contain significant quantities of organics, rubble and deleterious debris, and are at a proper moisture content to achieve the desired degree of compaction.

Page 194 ends

Geotechnical Engineering Report Update Page 7

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Drought Considerations
The soils at the site are considered expansive. These soils swell when the moisture content increases and shrink when the soil moisture content decreases. It will be essential that the soil moisture content under and near foundations and exterior concrete flatwork remain relatively constant to mitigate the potential for heaving or settling of the foundation and slabs.

The State of California can experience significant periods of severe drought conditions. If this occurs, the ability for homeowners to use irrigation as a means for maintaining landscape vegetation and soil moisture could be inhibited for unpredictable periods of time. For this reason, landscape and hardscape systems for this development should be carefully planned to prevent the desiccation of soils under and near foundations and slabs. Trees with invasive shallow root systems should be avoided. No trees or large shrubs that could remove soil moisture during dry periods should be planted within five feet of any foundation or slab. Fallow ground adjacent to foundations must be avoided.

To reduce potential for soil creep adversely affecting residential foundations or exterior flatwork, we recommend a minimum horizontal distance of five feet be provided and maintained between the outside edge of the foundation or flatwork to the nearest adjacent slope (e.g. building pad hinge point), for slopes greater than two feet in height.

Construction Testing and Observation
Site clearing and preparation for the site should be accomplished in accordance with the recommendations included in this update report and the referenced geotechnical reports, where applicable. The Geotechnical Engineer’s representative should be present during site preparation and all lot grading operations to observe and test the fill to verify compliance with our recommendations and the job specifications. We also recommend that our firm be retained to review final plans and specifications to determine if the intent of our recommendations has been implemented into those documents. Wallace-Kuhl & Associates has been contracted to provide foundation plan review services for the subject lots.

LIMITATIONS
This letter is considered to be an update to the referenced geotechnical reports prepared for the Heritage development, which included the subject site, and therefore the conclusions and recommendations contained herein are subject to the limitations stated in that report.

Page 195 ends

Geotechnical Engineering Report Update Page 8

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Thank you for this opportunity to be of service. If you have any questions regarding this update or the previous geotechnical engineering report, please contact our office.

Wallace-Kuhl & Associates
Matthew S. Moyneur
Senior Engineer
Attachments: Geotechnical Engineering Report Update, Heritage Development Villages 1 through 5 (WKA No. 9523.06, dated January 16, 2014)
Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 (Geocon Project No. S2028-05-01; dated August 27, 2021)

Page 196 ends
Page 197 ends
Page 198 ends
Page 199 ends
Page 200 ends
Page 201 ends
Page 202 ends
Page 203 ends
Page 204 ends
Page 205 ends
Page 206 ends
Page 207 ends
Page 208 ends
Page 209 ends
Page 210 ends
Page 211 ends
Page 212 ends
Page 213 ends
Page 214 ends
Page 215 ends
Page 216 ends
Page 217 ends
Page 218 ends
Page 219 ends
Page 220 ends
Page 221 ends
Page 222 ends
Page 223 ends
Page 224 ends
Page 225 ends
Page 226 ends
Page 227 ends
Page 228 ends
Page 229 ends
Page 230 ends
Page 231 ends
Page 232 ends
Page 233 ends
Page 234 ends
Page 235 ends
Page 236 ends
Page 237 ends
Page 238 ends
Page 239 ends
Page 240 ends
Page 241 ends
Page 242 ends
Page 243 ends
Page 244 ends
Page 245 ends
Page 246 ends
Page 247 ends
Page 248 ends
Page 249 ends
Page 250 ends
Page 251 ends
Page 252 ends
Page 253 ends
Page 254 ends
Page 255 ends
Page 256 ends
Page 257 ends
Page 258 ends
Page 259 ends
Page 260 ends
Page 261 ends
Page 262 ends
Page 263 ends
Page 264 ends
Page 265 ends
Page 266 ends
Page 267 ends
Page 268 ends
Page 269 ends
Page 270 ends
Page 271 ends
Page 272 ends
Page 273 ends
Page 274 ends
Page 275 ends
Page 276 ends
Page 277 ends
Page 278 ends
Page 279 ends
Page 280 ends

Project No. S2028-05-01
August 27, 2021

VIA ELECTRONIC MAIL
Glenn Matsuhara
Matsuhara Associates, LLC
[email protected]
Subject: LIMITED GEOTECHNICAL EVALUATION OF EXISTING FILL HERITAGE DEVELOPMENT – PARCEL 4
COUNTY ROAD 25A AND MIEKLE AVENUE

WOODLAND, CALIFORNIA
Mr. Matsuhara:

In accordance with your authorization, we have performed a limited geotechnical evaluation for the approximately seven-acre parcel identified as Parcel 4 located on the northwest corner of County Road 25A and Miekle Avenue in Woodland, California.

PROJECT DESCRIPTION AND BACKGROUND
The site consists of Parcel 4 within the Heritage residential development in the southern portion of the City of Woodland. The site area is approximately seven acres and is located on the west side of Mielke Avenue and north of (future) County Road 25A. The site is currently undeveloped and is vegetated with grasses and some mature trees. The site has historically been used for agricultural (row crop) production and has most recently been used for storage of soil stockpiles from nearby development projects. Most of the stockpiles have been removed, however, some still remain.

Wallace-Kuhl & Associates (WKA) prepared a geotechnical engineering report update Villages 1 through 5 of the overall Heritage development, of which the Parcel 4 site is a part. (WKA, 2014). The WKA study included subsurface explorations on and near the Parcel 4 site and indicate the presence of stockpiled soil in various locations throughout the development, including the Parcel 4 site. The WKA report indicated that the site is underlain by alluvial soil generally consisting of interbedded layers of clay and sand, which is consistent with our experience in the area.

We understand that you are considering developing the site with two-story detached residential buildings and private interior streets. However, before proceeding with design and development, you have requested a preliminary evaluation of the character and extent of stockpiles/fill on the site.

SCOPE OF SERVICES
As requested, we performed the following scope of services:
• Performed a site reconnaissance to determine access and mark out the proposed exploration locations. • Notified subscribing utility companies via Underground Service Alert (USA) a minimum of two business days (as required by law) prior to performing exploratory excavations at the site. • Performed 11 test pits (TP1 through TP11) throughout the site using a mini excavator. • Photographed and logged the conditions encountered in the test pits. • Prepared this letter describing the nature and extent of the fill at the site.

Page 281 ends

Geocon Project No. S2028-05-01 -2- August 27, 2021

OBSERVATIONS AND DISCUSSION
On September 23, 2020, we performed a site reconnaissance and observed the excavation of 11 test pits throughout the site using a mini-excavator. On this date, the site was covered with a moderate growth of dry, annual grasses. The test pits ranged in depth from approximately 3 to 5 feet and penetrated the fill to expose native alluvial soil as described in the WKA geotechnical reports. The approximate test pit locations and depth of fill at each test pit are shown below:

The fill generally consisted of sandy lean clay, which is similar to the alluvial soil. The consistency of the fill was variable, and it appears that the fill did not receive specific compaction effort. We did not observe significant concentrations of organics, rock, or deleterious materials within the fill.

CONCLUSIONS
Based on our observations, the site is blanked by approximately 2 to 4 feet of undocumented fill generally consisting of sandy lean clay, which is similar to the native alluvial soil at the site. The fill is likely suitable for re-use on the site; however, remedial grading in the form of removal and recompaction would be require as part of site grading. Screening and removal of minor amounts of deleterious material should also be expected. Specific recommendations for site grading and subsequent development should be provided in a future geotechnical update study specific for this site.

Page 282 ends

Geocon Project No. S2028-05-01 -3- August 27, 2021

LIMITATIONS
Our services were limited to evaluate the character and extent of existing fill on the site. A site-specific geotechnical update study will be required for site design and development. Our services were performed in accordance with engineering principles and practices generally accepted at this time and location. We make no warranty, express or implied.

Please contact us if you have any questions regarding this letter or if we may be of further service.

Respectfully Submitted,
GEOCON CONSULTANTS, INC.

Jeremy J. Zorne, PE, GE
Senior Engineer

Page 283 ends

EXHIBIT “E”

RUBY ESTATES DEVELOPMENT AGREEMENT

PROJECT CONDITIONS OF APPROVAL
JUNE 16, 2022

GENERAL CONDITIONS

1. Project Approval. The project shall be substantially (as determined by the City) developed as depicted on the maps and exhibits included in the July XX, 2022 City Council staff report, as approved by City Council, for the Ruby Estates project as proposed by the applicant New Home Company of Northern California LLC, except as modified by these conditions of approval. The Project approval includes Tentative Subdivision Maps (TSM #5221) a Zoning Amendment to allow Planned Development Overlay, a Conditional Use Permit, Site Plan and Design Review, and a Development Agreement for a parcel of land located within the Spring Lake Specific Plan Area to allow development of 87 single-family lots and 233(174 garage 59guest) on-site parking spaces, consistent with the Medium Density General Plan land use designation and multi-family R-15 specific plan designation for the property. APN: 042-030-054

2. Development Agreement. The Development Agreement between the City of Woodland and New Home Company of Northern California LLC, a Delaware Limited Liability Company, as approved by City Council at a first reading on July XX, 2022, are fully enforceable.

3. Indemnification. The applicant shall defend, indemnify, and hold harmless the City of Woodland, its agents, officers or employees from any claim, action or proceeding against the City of its agents, officers or employees to attack, set aside, void or annul an approval of the subject application by the City, its legislative body, advisory agencies or administrative officers. The City will promptly notify the applicant of any such claim, action or proceeding against the City and the applicant will either, at the City’s discretion, undertake defense of the matter and pay the City’s associated legal costs, or will advance funds to pay for the defense of the matter by the City Attorney.

4. Deed Disclosures. Deed Disclosures that satisfy Development Regulation 2.1 (Disclosures) of the Spring Lake Specific Plan shall be submitted for review and approval by the Community Development Director and City Attorney. These approved disclosures shall be placed on deeds for final lots as specified by the Development Regulation. The deed disclosures for all lots shall include language that addresses Development Regulation 2.35.6 (Landscape Strips along local streets) within Spring Lake.

Page 284 ends

5. School Disclosure. The applicant shall include a disclosure statement on deeds for final lots the existence of the existing school facility located north of the project site and range of activities that occur at the facility.

6. Informing Agencies & Subcontractors. Secure approval and satisfy requirements of all agencies of jurisdiction. The applicant/developer shall be responsible for informing all subcontractors, consultants, engineers, or other business entities providing services related to the project of their responsibility to comply with all pertinent requirements of the City of Woodland Municipal Code, including the requirement that a business license be obtained by all entities doing business in the City as well as hours of operation requirements in the City in addition to applicable state and federal laws.

7. Construction Impact Management Plan. Prior to issuance of any permit or inception of any construction activity on the site, the developer shall submit a construction impact management plan including a project development schedule and “good neighbor” information for review and approval by the Community Development Department.

The plan shall include, but is not limited to public notice requirements for periods of significant impacts (noise/vibration/street closures, tree removal, etc.), special street posting, construction vehicle parking plan, phone listing for community concerns, names of persons who can be contacted to correct problems, hours of construction activity, noise limits, dust control measures, and security fencing and temporary walkways.

8. Home Owners Association (HOA) Formation Documents and Conditions, Covenants and Restrictions (CC & Rs). Prior to approval of the first final map submit, three (3) copies of the Homeowners Association CC&Rs to the Community Development Department for review and approval prior to recordation of the CC&Rs, to include:
a. Recreational vehicle parking is prohibited.
b. To the extent consistent with State law, garage conversion to residential use is prohibited except the temporary use as a model home sales office. When the sales office is vacated, it must be converted back to a garage. c. Garages shall not be converted for storage use only. Garages shall be kept clear for residential vehicle parking.
d. The color of residential structures shall not be restricted. This provision shall be enforced through mechanisms established in the CC&Rs.
e. Maintenance of privately owned streets, street lights, and storm drainage.

9. Landscape Maintenance Agreement. The applicant/HOA shall enter into a recorded landscape maintenance agreement with the City of Woodland. The landscape

Page 285 ends

maintenance agreement shall run with the property. The landscape maintenance agreement shall provide for the continual maintenance of the property in a neat and tidy manner, landscape maintenance and replenishment of plants. A copy of the recorded landscape maintenance agreement shall be provided to the Planning Division to be kept on file prior to Certificate of Occupancy.

10. Fee Notice. The conditions of approval set forth herein include certain fees, dedication requirements, reservation requirements and/or other exactions. Pursuant to Government Code, Section 66020(d), these conditions constitute written notice of the amount of such fees, and a description of the dedications, reservations and other exactions.

The applicant is hereby notified that the 90-day protest period, commencing from the date of project approval, has begun. If the applicant fails to file a timely protest regarding any of the fees, dedication requirements, reservation requirements and/or other exactions contained in this notice, complying with all the requirements of Government Code, Section 66020, the applicant will be legally barred from later challenging such fees, dedications requirements, reservation requirements and/or other such exactions. Notwithstanding the foregoing, the City does not waive any rights it may have to enforce any settlement agreement, memorandum of understanding or other agreement with the applicant which authorizes the City to impose certain fees, and which may waive the applicant’s right to challenge the imposition of some or all of the fees, dedication requirements, reservation requirements, and/or other exactions set forth in these conditions of approval.

11. Affordable Housing. The project is responsible for providing 9 low-income units. The applicant will pay fees in lieu of constructing the on-site affordable housing consistent with Development Agreement Section 4.8.

12. Fair Share Cost. The applicant agrees to fund on a fair share basis, as determined by the City of Woodland nexus study, public facilities, services, and improvements including transit capital and operating costs, design and construction of transit stops, fire station construction and operations (Development Regulations 4.7.3, 4.9.5, 6.22 and 6.23), police operations (Development Regulations 6.30 and 6.31), park development (Development Regulation 5.6), greenbelts/pathways/trails (Development Regulation 5.28), and library services (Development Regulation 6.42 and 6.43) pursuant to Development Regulation 2.7 (Fair Share fees and Financing).

13. Backbone Infrastructure. Prior to occupancy within any subdivision, necessary backbone infrastructure and services to serve the subdivision, as determined by the City of Woodland, must be in place, and adequate fire service must be demonstrated, pursuant to Development Regulation 2.8 (Infrastructure and service availability), 4.4 through 4.7 (roadway improvements), 6.24 and 6.25 (fire station).

Page 286 ends

14. Funding Public Services. Prior to issuance of a building permit, the funding of public services shall be addressed pursuant to Development Regulations 2.7, 6.23 and 6.37.

15. Building Unit Allocations (BUA) s. With the exception of affordable housing, approval of a final map requires that all lots included in the final map, have a building unit allocation. No final map shall be recorded by the City unless BUAs for that map are assigned with the final map. If BUA’s are transferred from another site, or if BUAs are requested to be added, either transaction shall be recorded to the satisfaction of the Community Development Department and in compliance with the BUA Ordinance.

FINANCE DEPARTMENT

16. SLIF Shortfall No shortfall fee will be required if at least 87 units are built.

17. SL Maintenance Facilities District. Prior to recordation of each final map, with respect to that map, OWNER shall petition the City to be annexed into the boundaries of the Spring Lake Maintenance Community Facilities District. The OWNER agrees to provide any and all information necessary to complete such annexation within 45 days of making this petition.

18. SL Community Facilities District 2004-1. OWNER shall petition the City to be annexed into the boundaries of the Spring Lake Community Facilities District 2004-1 prior to the approval of each map. OWNER agrees to provide any and all information necessary to complete such annexation within 45 days of making this petition.

COMMUNITY DEVELOPMENT

19. Coordination of Plans. The applicant shall be responsible for coordinating all plans to ensure consistency throughout site plan, landscaping plans, and improvement plans, prior to submittal for review.

20. Design Review. The site shall be developed and maintained in accordance with the approved plans, which include architectural elevations, exterior materials and colors, conceptual landscape, site and floor plans. Should there be a change in the plans, the change shall be described and provided in writing to be evaluated by the Community Development Director to determine general consistency with the Spring Lake Specific Plan Design Standards and Planned Development Standards. All exterior changes beyond those stated in the original approval will require staff level design review.

21. Requirements of all Agencies. The applicant shall secure approval and satisfy requirements of all agencies with jurisdiction prior to operating.

22. Final Plan Set. Prior to the issuance of building permits, the applicant shall include a Final Plan Set, with all conditions of approval incorporated or clearly listed on the

Page 287 ends

plans. The conditions shall be printed on a full-size plan sheet(s). All plans, including site, grading, civil, mechanical, street improvement, landscaping, and architectural elevations shall be coordinated for consistency prior to issuance of permits.

23. Setbacks and Lot Standards. Setbacks and other area requirements for all homes and related structures shall be consistent with the requirements of Table 2.4 of the Spring Lake Specific Plan and the approved Planned Development Overlay standards as provided in the City Council Resolution approving the Tentative Subdivision Map, Conditional Use Permit and Planned Development.

24. Driveway Entrances. Textured, colored, stamped concrete design or a similar design shall be provided at the primary driveway entrances as generally depicted in the Design Review plans.

25. Energy Efficiency and Climate Action Plan. The land plan for the project has been designed to maximize energy efficiency to the extent possible. All buildings shall be designed to meet, and are recommended to exceed, energy efficiency requirements provided in the Spring Lake Specific Plan, including solar requirements. In addition, the project shall be designed to address strategies identified in the City of Woodland’s Climate Action Plan (CAP). The project will meet all measures as outlined in the Climate Action Plan checklist. Verification will be required prior to issuance of building permits.

26. Photovoltaic Panels. At minimum, each home shall be photovoltaic ready and shall: 1) be pre-wired; 2) have adequate roof strength to support solar panels; 3) roofs to have minimal penetrations in order to accommodate solar panels; 4) a 200 amp main electrical panel; and 5) space provided adjacent to main panel for solar disconnect and associated equipment (inverter). If not provided as a standard feature, photovoltaic systems shall be offered by the builder as an upgrade offered at the time of initial purchase.

27. Electric Vehicle Charging Infrastructure. Each home shall have a dedicated 240-volt, 40-amp circuit for electric vehicle charging station in every garage or as required by the most current California Green Building Standards. Garages shall have adequate ventilation as required for vehicle charging stations. Compliance with this condition shall be clearly indicated on the building permit plans for each single-family home.

28. Trash and Recycling Container Storage. Areas shall be provided for designated storage of trash and recycling containers in compliance with Spring Lake Design Standard 2.8.

Such areas shall be located adjacent to the house and screened from view of the streets.

Information shall be verified prior to issuance of building permits.

Page 288 ends

29. Landscape Plan Submittal. Detailed Landscape and Irrigation Plans, shall be designed and prepared by a licensed landscape architect and shall be certified in accordance with City and State water conservation requirements. Landscape plans shall be submitted and approved by the Community Development and Public Works Departments prior to issuance of building permits. Landscape plans shall specify the following:
a. Locations, size and quantity of all plant materials. b. A plant legend specifying species type (botanical and common names), container size, maximum growth habit and quantity of all plant materials. c. Location of all pavements, fencing, wheel stops or curbs, buildings, structures, light poles, property lines and other pertinent site plan features. d. Location of utilities in relation to on site planting and street trees. e. Planting and installation details and notes including soil amendments. A soil fertility test shall be prepared prior to approval of plans to determine planting and amendment requirements.
f. Existing trees on site shall be identified. Trees planned for removal or relocation shall be marked on the plans, and the methodology to preserve existing adjacent trees during construction of new footings shall be provided on plans consistent with the Arborist report prepared by Sierra Nevada Arborists. g. Any trees for removal and identified as heritage, specimen, or landmark under City code shall be mitigated for per City requirement.
h. Details of all irrigation (drip, sprinkler, bubbler) as well as equipment such as backflow controller and water meter devices identified. i. Shared open space, culvert overcrossing to include all associated amenities and lighting.

30. Compliance with City and State Water Conservation Ordinance. The project shall comply with City and State Water Conservation Ordinance, as well as water conserving requirements in the Spring Lake Specific Plan and Design Standards. This applies to all yard and public landscaping. Plans shall be reviewed for compliance prior to issuance of building permits.

31. Shade Tree Planting. Shade trees shall be planted such that 50 percent of the uncovered stalls will be in shade at noon at landscape maturity. Planters containing trees shall not be less than four feet in width and shall be protected by wheel stops or curbs.

Page 289 ends

32. Tree Planting. All trees shall be planted and staked with Reddy stakes (or equivalent) in accordance with city standards.

33. Street Tree Master Plan. A Final Street Tree Master Planting Plan shall be approved prior to the issuance of the first building permit. The plan shall be reviewed for conformance with the Spring Lake Approved Street Tree list and shall be reviewed and approved by the Community Development Department and the City’s Community Services Department, Urban Forestry division. A soils test shall be submitted that will assist in appropriate species selection. Trees shall be a minimum of 15-gallons in size.

A minimum of two alternate species shall be provided per street.

34. Tree and Utility Planting Plan. Due to the smaller lots, utilities shall be carefully located in order to ensure that each lot can maintain one street tree without conflict.

Coordination in the placement of all utilities in relation to street trees shall be required.

A Plan set illustrating tree and utility placement will be required prior to issuance of building permits and shall be coordinated with the Street Tree Master Plan

35. Public Landscaping. Landscaping design, materials, installation and maintenance in roadways, medians, greenbelts, subdivision trails, and other public areas shall be consistent with applicable City requirements. Landscaping shall satisfy and fully implement Development Regulations 2.15.1 and 4.16 (Tree Canopy), 2.22 (Drought – tolerant plantings), 4.17 (Timing of landscaping), 4.17.1 (landscaping at intersections),

4.18 and 4.19 (bikeway and landscaping) and 7.13 (public landscaping). Due to the unique nature of the housing product and site conditions, minor modification may be permitted subject to review and approval of the Community Development Department

36. Utility Design. The location of all utility structures shall be coordinated with and depicted on the landscaping plans. Location and installation of utility structures shall be to the satisfaction of the Community Development Director and City Engineer.

Public utility lines, along public street frontages and /or landscaped areas shall be underground type unless otherwise approved by the Community Development Director and City Engineer. The applicant shall ensure consistency with Development Regulation 2.11 (Utilities), 2.13 (connectivity), 2.21 (utility facilities) and 6.17 through

6.19 (general utility requirements).

37. Street and Lot Lighting. Lights along local roads and in public use areas shall be consistent with SL Development Regulation 2.22.2. The project shall install LED streetlights to meet City Standards in effect at the time improvement plans are completed.

38. Residential Fencing. All wood fence footings and foundations shall be constructed of galvanized steel, reinforced concrete, or masonry. No treated wood materials in contact with the ground will be permitted. All wood fencing shall be stained with a semiPage 290 transparent or opaque water sealant to prevent water damage and staining.

Consideration shall be given to the use of wood with integral stain. All required notes/details shall be provided on plans prior to the issuance of permits. Fencing shall comply with Section 2.9 of the SL Design Standards.

39. Fencing Plan. Prior to issuance of building permits submit a final fencing plan for review and approval which identifies the material, location and design of all fencing on the project, including perimeter, good neighbor, interconnecting walkways and paths and accent fencing.

40. North Property Wall. The existing fencing along the north boundary of the project shall be replaced with wood fence that will be a minimum of six-feet in height, on either side as measured from the finished pad elevation. The location and design of the fence shall be shown on the Improvement Plans for the project. The design shall be approved by the Community Development Department prior to approval of Improvement Plans.

OWNER shall work with the adjacent property owners to obtain necessary permission to remove the existing fencing and install the new fencing.

41. Double Wall Treatment. Should OWNER be unable to obtain necessary rights of entry from property owners to remove the existing fencing and construct new fences in condition 40 above, OWNER shall propose new construction design for the City’s approval that does not need adjacent property owners’ approval and minimizes a nuisance or hazard double wall condition.

42. On-Site Parking. In no case shall the number parking spaces be reduced without prior approval of the Community Development Dirctor.

43. A light sand finish stucco texture shall be utilized on all homes and window trim (no lace texture).

MITIGATION MEASURES

44. SLSP Mitigation Requirements. The project applicant shall comply with all mitigations required by the TOC EIR Mitigation Monitoring Program including provided as Attachment A to the SLSP, as well as adherence to the Yolo HCP/NCCP, any further analysis provided through additional studies and evaluations required to ensure compliance with mitigations. This includes a pre-construction and/or tree removal survey by a qualified biologist that will include a Raptor and a Ground Nesting Raptor Survey (4.5-3).

45. Ground Nesting Raptor Survey. Pursuant to Mitigation Measure 4.5-3(a), thirty (30) days prior to commencement of grading or any site work, the applicant shall have prepared and submitted a survey for ground nesting raptors (e.g. norther harrier and burrowing owl). This survey shall be prepared by a qualified raptor biologist using

Page 291 ends

appropriate protocol acceptable to responsible agencies. If survey nesting raptor species are found, then mitigation measures 4.5-3(b-d) of the Spring Lake Specific Plan Mitigation Monitoring Plan shall be followed. Survey results are valid only for the season when construction activity occurs.

46. Pre-Construction or Pre-tree Pruning or Removal. Each landowner or applicant shall conduct a pre-construction or pre-tree pruning or removal survey of trees greater than 30 feet tall during the raptor breeding season (March 1- September 15). The survey shall be conducted for a half mile around the proposed site at which any construction activity is proposed. The survey shall be conducted by a qualified raptor biologist during the same calendar year that the proposed activity is planned to begin to determine if any nesting birds-of-prey would be affected.

47. Environmental Noise Analysis. The design of the project shall comply with the exterior and interior noise level requirements of the Noise Element of the City of Woodland General Plan

48. Geotechnical. The design and construction of improvements shall be in accordance with recommendations contained in the Conclusions and Recommendations Section of the Preliminary Geotechnical Engineering Report.

49. Air Quality Directives. Owner shall comply with Air Quality Management District directives as specified in Development Regulation 2.12 for both off-road and on-road low-emissions heavy-duty vehicles and construction equipment during all grading and construction. (SLSP page 7-4, Regulation 7.3).

50. Mosquito Vector Control. Prior to each construction season, each landowner or applicant with a project under construction shall consult with, and implement the recommendations of the Mosquito Vector Control District regarding control of mosquitoes, black gnats, and other vectors.

51. Construction Recycling. Prior to the commencement of construction on any project, the applicant shall ensure that the construction contractor has established construction recycling measures pursuant to the requirements of the Mitigation Monitoring Plan and all other City requirements. (MM 4.13-18)

52. Dust Suppression. Applicant shall comply with all dust suppression requirements during all grading and construction activities (SLSP Regulation 7.4)

53. Off-site Improvements. Off-site improvements must satisfy the requirements of SLSP and SLSP MM including but not limited to Development Regulation 6.13 and Mitigation Measure 4.5-7.

Page 292 ends

54. Cultural Resources. During grading or any site work, development must comply with Development Regulation 7.22 (MM 4.10-1)

55. CEQA Filing Fees. Within five working days after project approval, the applicant shall pay a mandatory Notice of Determination filing fee of $50 (or latest fee in effect at time of payment) for County Clerk processing, made payable to Yolo County Clerk and submitted to the Woodland Community Development Department. If the required filing fee is not paid for a project, the project will not be operative, vested, or final and any local permits issued for the project will be invalid (Section 711.4)(3) of the Fish and Game Code.) NOTE: If the fee is not paid within five days after approval of the project, it will extend time frames for CEQA legal challenges.

DEVELOPMENT ENGINEERING
Roadways

56. The applicant shall replace all cracked and broken sidewalk along the project frontage.

57. The applicant shall replace all frontage that does not meet ADA standards with CityStandard ADA-compliant driveways, curb, gutter or sidewalk.

58. The applicant shall replace/install City-Standard ADA-compliant curb ramps.

59. Miekle Avenue is under moratorium for cuts into the new street (accepted on 5/4/2021; moratorium expires on 5/4/2028). City understands and acknowledges that Applicant will make certain cuts to make connections to various existing utilities in Miekle Avenue including sanitary sewer, storm drainage and water pipes. Applicant understands that all such repairs to Miekle Avenue shall include surface restoration consistent with City standards. Private Roadways/Alleys shall be constructed to City standard structural sections, with a minimum of 4” AC over 12” AB or as otherwise recommended by a certified soils report. Should there be a need for the City to maintain/repair public utilities requiring trenching through private alleys, such repair shall include surface restoration consistent with City standards.

60. This project shall complete the traffic signal improvements at the intersection of County Road 25A and County Road 102. This work is reimbursable through the SLIF program.

Easements and Right of Way

61. Appropriate easements shall be required for City maintained facilities located outside of City owned property or the public right-of-way.

62. A ten (10) foot public utility easement back of separated sidewalk, adjacent to all public streets within the development shall be dedicated to the City and may be required elsewhere as requested by the utility companies and approved by the City.

63. Final map shall dedicate easements to allow connection of sewer, water, storm drain facilities across parcels and vehicular and pedestrian access, so that each

Page 293 ends

parcel may attach to the public system. Easements may be dedicated through one of the following mechanisms:

A. A legally binding CC&R document, reviewed and approved by the City and recorded on the title of the land;
B. Prior to approval of the final map the applicant shall enter into an Agreement for Conveyance of Easements and record it against the property. The map shall reference the agreement; or
C. A statement on the map as follows “We hereby reserve easements for reciprocal private access, drainage, utilities, and maintenance, on, over, and across Parcels and these easements shall bind and insure to the benefit of the heirs, administrators, executors, and successors of the grantors and are for the benefit of each of Parcels so described.”
Landscaping

64. Public landscape strips (between back of curb and sidewalk) along the public streets (Miekle Avenue and County Road 25A) are considered a public improvement. Design and construction of public landscaping areas shall be included in plans and proceed concurrent with adjacent development.

All public landscape areas shall connect to onsite water service, meter and irrigation system. Landscape shall be irrigated and maintained by the Homeowners Association for the project. Applicant shall enter a Landscape maintenance agreement with the City.

65. Trees within the Public Landscape strip shall be irrigated per City of Woodland Standards via connection to onsite water service, meter and irrigation system. City will maintain trees within the public landscape area.

Wastewater and Sewer Collection System

66. Sewer mains, including sewer wyes, throughout the project shall be publicly owned and maintained. Sewer laterals, including cleanouts, up to the connection point at the wye shall be privately owned and maintained. All publicly owned and maintained sewer facilities shall be within a public utility easement. Privately owned sewers shall be designed to City standards.

67. Sewer Mains shall not be less than 8” in diameter and shall be constructed to public/City standards.

68. The property shall be connected to the City of Woodland sewer system, with a separate sewer lateral required for each parcel, in accordance with City of Woodland standards.

69. The Tentative Map Sewer Plan showing sewer routing, pipe slopes and sizing and locations, are preliminary only and do not constitute approval in any way. Final

Page 294 ends

approval for the Sewer Plan shall occur with the final improvements based on the requirements set forth in these conditions of approval.

70. Top-of-line sewer mains shall terminate with a manhole (not a cleanout).

71. Abandon all unused stubs to the property per city standards.

Storm Water

72. The project shall participated in the East Regional Detention Basin (the area wide storm drain detention improvement). Applicant shall design and construct drainage improvements consistent with the most recent version of the City's Storm Drainage Master Plan criteria and Standard Specifications and Details. If required, the pad heights may have to be raised from those shown on the preliminary grading plan of the tentative map.

73. Storm drain systems shall be private and the responsibility of the HOA. Private ownership and maintenance responsibilities shall terminate at the first connection point (manhole or inlet) to the City’s system within a public street. Privately owned lines shall be constructed to City standards and shall not be less than 18” in diameter. (Note connection day lighting at the driveway is not permitted, connections will need to be at a manhole in the street.).

74. Abandon all unused stubs to the property per city standards.

Storm Water Quality Control

75. Construction of projects disturbing more than one acre of soil shall require a National Pollution Discharge Elimination System (NPDES) construction permit.

Applications/projects disturbing less than one acre of soil shall implement BMP’s to prevent and minimize erosion. The improvement plans for construction of less than 1 acre shall include a BMP to be approved by the City Engineer.

Prior to Building Permit Owner shall submit post construction work sheet in accordance with Appendix 8 of the City’s Post Construction Standards Manual; to demonstrate how the project is meeting low impact development standards, Hydromodification standards, and Storm Water Quality Standards.

76. OWNER may reference the City’s Post Construction Standards Manual on the web. http://www.cityofwoodland.org/gov/depts/cd/divisions/engineering/development/ h2oquality.asp
Water Infrastructure

77. All materials and installation of the water system shall be at the developer’s expense per City of Woodland Standard Specifications and Details.

Page 295 ends

78. Water meters shall be owned and maintained by the City. Water meters shall not be located in driveways; unless specifically and individually approved by the City Engineer.

79. Water mains, water laterals, and water meters throughout the project shall be publicly owned and maintained up to and including the meter. All publicly owned and maintained water facilities shall be within a public utility easement. Water laterals beyond the meter are considered private. Private water facilities shall be constructed in accordance with City Standards.

80. Until such time as actual service connections are approved for the subdivision, the water agency may withhold water service due to a water shortage declared by the water agency.

81. The Tentative Map Water Plan showing water routing, sizing and locations, are preliminary only and do not constitute approval in any way. Final approval for the Water Plan shall occur with the final improvements based on the requirements set forth in these conditions of approval.

82. Abandon all unused stubs to the property per city standards.

83. Any fire hydrant installed will require, in addition to the blue reflector noted in Standard Drawings, an additional blue reflector and glue kit that is to be supplied to the City of Woodland Fire Department for replacement purposes.

84. The project shall have a separate metered water service that is solely for the landscape irrigation system.

85. Tees on water mains shall be equipped with two (2) valves; crosses shall be equipped with three (3) valves. Avoid locating valves on deep (>60") water line sections and inside concrete areas wherever possible to facilitate repairs.

86. 8” dead-end mains serving only 6 homes will result in stagnant water requiring frequent flushing. Reduce dead end main sizes to 6” (or 4” if sprinkler calcs allow) and place a blow off at the end of the line.

Grading

87. A topographic survey of the entire site and a comprehensive grading and drainage plan prepared by a registered civil engineer, shall be required for the development. The plan shall include topographic information on adjacent parcels. In addition to grading information, the grading plan shall indicate all existing trees, and trees to be removed as a result of the proposed development, if any. A statement shall appear on the site grading and drainage plan, which shall be signed by a registered civil engineer or land surveyor and shall read, “I hereby state that all improvements have been substantially constructed as presented on these plans”. Reference the City of Woodland Engineering Design and Construction Standards for additional requirements.

Page 296 ends

88. The Tentative map Preliminary Grading plan showing grading and drainage information including topographic information, drainage routing, pipe slopes and sizing and locations, and overland drainage routing are preliminary only and do not constitute approval in any way. Final approval for the grading and Drainage Plan shall occur with the final improvements based on the requirements set forth in these conditions of approval.

89. The differential in elevation between rear and side abutting lot lines shall not exceed twelve inches (12") without construction of concrete or masonry block retaining walls.

Fees

90. The Owner shall pay all required fees for processing final maps (technical check) with final map submittal.

91. Prior to approval of improvement plans, the Owner shall pay all fees for plan check and inspection of offsite infrastructure improvements, as approved by City Council and defined in the City Fee Schedule. If Owner pays a deposit only at improvement plan submittal, the balance shall be paid prior to improvement plan approval by the City Engineer. If contract inspection is necessary for the project Owner shall prefund a liability account and sign an advanced funding agreement.

92. Owner shall pay applicable Development Impact Fees or connection fees in effect at the time of building permit issuance

93. Owner agrees to pay to City a general purpose fee, a total of $5,000 per building permit, to be used for the City Southeast Area Aquatics Center Project. Payment shall be made at time of approval of final map. Final determination of cost shall be made at time of payment and shall be based on inflationary cost increases (Construction Cost Index (CCI)).

At final Map Owner shall pay Transit Capital fee of $247 per lot for a total of 21,489 and a Transit Operating Fee of $51 per lot for a total of $4,437.

At final Map Owner shall pay a fee of $771 per lot for SL fire operations for a total of $67,077.

94. The conditions of approval set forth herein include certain fees, dedication requirements, reservation requirements and/or other exactions. Pursuant to Government Code, Section 66020(d), these conditions constitute written notice of the amount of such fees, and a description of the dedications, reservations and other exactions.

The applicant is hereby notified that the 90-day protest period, commencing from the date of project approval, has begun. If the applicant fails to file a timely protest

Page 297 ends

regarding any of the fees, dedication requirements, reservation requirements and/or other exactions contained in this notice, complying with all the requirements of Government Code, Section 66020, the applicant will be legally barred from later challenging such fees, dedications requirements, reservation requirements and/or other such exactions. Notwithstanding the foregoing, the City does not waive any rights it may have to enforce any settlement agreement, memorandum of understanding, or other agreement with the applicant which authorizes the City to impose certain fees, and which may waive the applicant's right to challenge the imposition of some or all of the fees, dedication requirements, reservation requirements, and/or other exactions set forth in these conditions of approval.

General Conditions

95. Other than on-site street width, all civil improvements for water, sewer, storm, electrical, roadway sections, markings, and appurtenances shall conform to City Standards.

96. Applicant shall install a 6’ tall masonry wall along the County Road 25A project frontage. The cost for this improvement is reimbursable through the SLIF program.

97. Minimum standards for onsite lighting shall require the project to meet City municipal code standards for lighting of parking areas. In addition to lighting in the shared open space and along the paseos and walking paths within the development.

98. Developer shall document and show evidence that all tentative map conditions are met or secured with submittal of final map.

99. Enter into a (Subdivision) Improvement Agreement for the construction of public improvements prior to construction of any improvements, approval of improvement plans, approval of final map, or building permits.
100. Prepare improvement plans for the project which shall include any work within the public right-of-way and public utility easements and submit them to the Public Works department for review and approval. The improvement plan sheets shall include the title block as outlined in the City of Woodland Standard Specifications. This submittal is separate from the building permit submittal. All public improvements shall conform to the current City of Woodland Standard Specifications. 101. Submit proposed Street names to fire department for approval with a copy to Public Works prior to improvement plan or final map submittal. 102. Public improvements (within public right-of-way) in addition to roadway construction shall include water, sewer and storm drain mains, Fire hydrants, street lights, and landscaping.
103. Submit an application for reapportionment of assessments with the parcel map or subdivision map.

Page 298 ends

104. If improvements are constructed and/or installed by a party or parties other than the Developer, which improvements benefit Developer’s property, Developer shall pay a proportionate share of the costs of said improvements, including interest, prior to the issuance of building permit(s) (approval of the final map) to Developer. 105. If conditions for the project require Owner to construct improvements which benefit parties other than Owner, and are subject to reimbursement by others as determined by the City Engineer, Owner may request to enter into a reimbursement agreement drafted by the City. City shall endeavor to collect reimbursements from the benefiting party (ies) including requiring payment prior to approval of any entitlements for benefiting party(ies). All reimbursement agreements shall be executed prior to final map approval.
106. Final map shall tie into two City control network monuments in accordance with the City’s electronic submission ordinance
107. This project is subject to the construction and demolition debris recycling and diversion ordinance; contact the City’s Environmental Resource Analyst, at 661-2063 for more information.
108. Joint trench/utility plans shall be submitted to the City Engineer for review, prior to approval of the final map and improvement plans.
109. U.S. Post Office mailbox locations shall be shown on the improvement plans subject to approval by the City Engineer and Postmaster.

BUILDING
110. This project must meet all criteria and mandates for these City Adopted codes or the most current code:
a. 2019 California Residential Code
b. 2019 California Building Code
c. 2019 California Plumbing Code
d. 2019 California Mechanical Code
e. 2019 California Electrical Code
f. 2019 Building Energy Efficiency Standards
g. 2019 California Green Building Code
h. The Code of the City of Woodland (in accordance with the entitlement) 111. Other City and County Agencies (Health, Fire, Public Works, and Planning) may be required to approve the project prior to a building permit being issued. a. Recycle plan is required at time of permit issuance along with a deposit. b. Prior to any demolition work being performed, clearance from Yolo Solano Air Quality Management District is required.

Page 299 ends

112. Any deferred submittals that are not a part of the initial permit application must be listed on the cover sheet of the plan at the time of application for the project.\ 113. All plans, computations and specifications to be prepared and designed by an architect or engineer licensed by the state of California. 114. A licensed architect or licensed engineer shall be responsible for reviewing and coordinating all submittal documents prepared by others, including deferred submittal items, for compatibility with the design of the building. 115. A soils investigation report shall be provided as specified in section 1803.2 of the 2016 CBC.
116. Because this project is located in an area known to contain expansive soils and per Woodland General Plan Policy document, Part II, Policy 8.A.9, “The City shall require the use of special bending-resistant designs where foundations must be slab-on-grade in areas with expansive soil.” And per CBC 1808.6, footings or foundations for buildings founded on expansive soils shall be designed in accordance with CBC 1808.6.1 and for concrete slab-on ground foundations the design shall be in accord with CBC 1808.6.2 and PTI Standard Requirement for Design of Shallow Post-Tensioned Concrete Foundations on Expansive Soils or WR/CRSI Design of Slab-on-Ground Foundations and the specific recommendations as noted in the geotechnical engineering report. Please submit plans and calculations stamped and signed by a California register Civil or Structural Engineer or Architect showing compliance. Woodland General Plan Policy Document, Part II, Policy 8.A.9, CBC 1803.5.3 and CBC 1808.6.

Page 300 ends
Page 301 ends
Page 302 ends
Page 303 ends
Page 304 ends
Page 305 ends
Page 306 ends

LOT LOT LOT LOT
DEPTH1 WIDTH2 AREA COVERAGE FRONT REAR INT. SIDE ST. SIDE (FT) (FT) (FT2
) % (FT2) % LOT (FT) (FT) (FT) (FT)
1 67 32 2,941 42% 1698 58% Single Family 4 4 3.5 3.5
2 67 34 2,239 52% 1081 48% Single Family 4 4 3.5 3.5
3 67 42 2,958 42% 1715 58% Single Family 4 4 3.5 3.5
4 58 29 2,405 48% 1247 52% Single Family 4 4 3.5 3.5
5 58 36 2,088 60% 844 40% Single Family 4 4 3.5 3.5
6 58 43 2,581 48% 1338 52% Single Family 4 4 3.5 3.5
7 58 42 2,538 49% 1295 51% Single Family 4 4 3.5 3.5
8 58 33 1,943 60% 785 40% Single Family 4 4 3.5 3.5
9 58 43 2,593 48% 1350 52% Single Family 4 4 3.5 3.5
10 58 39 2,424 48% 1266 52% Single Family 4 4 3.5 3.5
11 58 36 2,098 59% 854 41% Single Family 4 4 3.5 3.5
12 58 43 2,585 48% 1341 52% Single Family 4 4 3.5 3.5
13 59 42 2,570 48% 1327 52% Single Family 4 4 3.5 3.5
14 59 34 1,974 59% 816 41% Single Family 4 4 3.5 3.5
15 59 43 2,642 47% 1398 53% Single Family 4 4 3.5 3.5
16 60 39 2,448 47% 1290 53% Single Family 4 4 3.5 3.5
17 59 36 2,142 58% 898 42% Single Family 4 4 3.5 3.5
18 59 43 2,665 47% 1421 53% Single Family 4 4 3.5 3.5
19 60 41 2,587 48% 1344 52% Single Family 4 4 3.5 3.5
20 60 34 2,003 58% 845 42% Single Family 4 4 3.5 3.5
21 60 43 2,701 46% 1458 54% Single Family 4 4 3.5 3.5
22 63 43 2,769 45% 1526 55% Single Family 4 4 3.5 3.5
23 63 34 2,094 55% 936 45% Single Family 4 4 3.5 3.5
24 63 41 2,531 59% 1039 41% Single Family 4 4 3.5 3.5
25 63 33 2,094 55% 936 45% Single Family 4 4 3.5 3.5
26 63 36 2,250 51% 1092 49% Single Family 4 4 3.5 3.5
27 63 41 2,563 58% 1070 42% Single Family 4 4 3.5 3.5
28 63 34 2,094 55% 936 45% Single Family 4 4 3.5 3.5
29 63 38 2,406 62% 913 38% Single Family 4 4 3.5 3.5
30 58 34 1,963 59% 805 41% Single Family 4 4 3.5 3.5
31 58 36 2,104 59% 861 41% Single Family 4 4 3.5 3.5
32 58 33 1,958 59% 800 41% Single Family 4 4 3.5 3.5
33 58 36 2,104 59% 861 41% Single Family 4 4 3.5 3.5
34 58 20 2,376 49% 1218 51% Single Family 4 4 3.5 3.5
35 60 52 3,073 49% 1580 51% Single Family 4 4 3.5 3.5
36 60 36 2,142 58% 899 42% Single Family 4 4 3.5 3.5
37 60 39 2,291 65% 798 35% Single Family 4 4 3.5 3.5
38 60 42 2,784 54% 1292 46% Single Family 4 4 3.5 3.5
39 58 39 2,268 55% 1024 45% Single Family 4 4 3.5 3.5
40 58 34 1,958 59% 799 41% Single Family 4 4 3.5 3.5
41 58 34 1,958 59% 799 41% Single Family 4 4 3.5 3.5
42 58 38 2,250 66% 757 34% Single Family 4 4 3.5 3.5
43 58 37 2,408 52% 1165 48% Single Family 4 4 3.5 3.5
44 58 36 2,109 55% 951 45% Single Family 4 4 3.5 3.5
45 58 39 2,250 66% 757 34% Single Family 4 4 3.5 3.5
46 58 39 2,250 66% 757 34% Single Family 4 4 3.5 3.5
47 58 36 2,104 59% 860 41% Single Family 4 4 3.5 3.5
48 58 41 2,503 60% 1011 40% Single Family 4 4 3.5 3.5
49 58 41 2,370 52% 1127 48% Single Family 4 4 3.5 3.5
50 58 36 2,088 60% 844 40% Single Family 4 4 3.5 3.5
51 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
52 58 36 2,088 60% 844 40% Single Family 4 4 3.5 3.5
53 58 43 2,505 60% 1012 40% Single Family 4 4 3.5 3.5
54 58 38 2,213 52% 1055 48% Single Family 4 4 3.5 3.5
55 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
56 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
57 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
58 58 40 2,335 53% 1092 47% Single Family 4 4 3.5 3.5
59 66 45 2,996 50% 1503 50% Single Family 4 4 3.5 3.5
60 66 36 2,387 52% 1144 48% Single Family 4 4 3.5 3.5
61 66 36 2,383 52% 1139 48% Single Family 4 4 3.5 3.5
62 66 34 2,214 52% 1055 48% Single Family 4 4 3.5 3.5
63 66 42 2,790 54% 1297 46% Single Family 4 4 3.5 3.5
64 63 36 2,250 51% 1092 49% Single Family 4 4 3.5 3.5
65 63 39 2,406 62% 913 38% Single Family 4 4 3.5 3.5
66 63 36 2,401 48% 1243 52% Single Family 4 4 3.5 3.5
67 59 38 2,705 55% 1213 45% Single Family 4 4 3.5 3.5
68 59 39 2,136 58% 892 42% Single Family 4 4 3.5 3.5
69 59 34 2,703 55% 1210 45% Single Family 4 4 3.5 3.5
70 60 32 2,867 52% 1375 48% Single Family 4 4 3.5 3.5
71 60 36 2,171 57% 927 43% Single Family 4 4 3.5 3.5
72 60 39 2,774 54% 1281 46% Single Family 4 4 3.5 3.5
73 58 37 2,749 54% 1256 46% Single Family 4 4 3.5 3.5
74 58 36 2,097 59% 854 41% Single Family 4 4 3.5 3.5
75 58 39 2,691 55% 1199 45% Single Family 4 4 3.5 3.5
BLDG SETBACKS (MIN.)

RUBY ESTATES TENTATIVE MAP

LOT MATRIX
LOT #

TYPE PRIVATE OPEN

SPACE / YARD AREA
S:\Projects\1800\1863 Ruby Estates\Calculations\1863 LOT MATRIX 1

Page 307 ends

LOT LOT LOT LOT
DEPTH1 WIDTH2 AREA COVERAGE FRONT REAR INT. SIDE ST. SIDE (FT) (FT) (FT2
) % (FT2) % LOT (FT) (FT) (FT) (FT)
BLDG SETBACKS (MIN.)

RUBY ESTATES TENTATIVE MAP

LOT MATRIX
LOT #

TYPE PRIVATE OPEN

SPACE / YARD AREA
76 59 29 2,461 47% 1303 53% Single Family 4 4 3.5 3.5
77 59 39 2,257 66% 764 34% Single Family 4 4 3.5 3.5
78 59 44 2,808 53% 1316 47% Single Family 4 4 3.5 3.5
79 58 29 2,384 49% 1226 51% Single Family 4 4 3.5 3.5
80 58 36 2,088 60% 845 40% Single Family 4 4 3.5 3.5
81 58 45 2,801 53% 1308 47% Single Family 4 4 3.5 3.5
82 58 30 2,447 51% 1203 49% Single Family 4 4 3.5 3.5
83 58 34 1,943 60% 785 40% Single Family 4 4 3.5 3.5
84 58 46 2,869 52% 1376 48% Single Family 4 4 3.5 3.5
85 66 31 2,824 44% 1581 56% Single Family 4 4 3.5 3.5
86 66 34 2,196 53% 1038 47% Single Family 4 4 3.5 3.5
87 55 24 2,888 40% 1730 60% Single Family 4 4 3.5 3.5
Depth Width Area
Avg. 60 37 2,391
Min. 55 20 1,943
Max. 67 52 3,073
1Depth of lot measured along shortest side lot line for irregularly shaped lots. 2Width of lot measured at front yard setback for irregularly shaped lots.

LOT # AREA (SF)
A 4,775
4,775
2%
B 675
D 584
E 964
F 964
G 964
H 913
I 1,350
J 1,515
K 1,555
L 553
M 1,019
N 1,016
O 980
13,050
4%
17,825
6%
LOT # AREA (SF)
C 80,296
80,296
26%

COMMON OPEN SPACE SUMMARY
TYPE
% OF SITE:
% OF SITE:
% OF SITE:
% OF SITE:

TYPE

PRIVATE PARK

PRIVATE PASEOS /

WALKWAYS

PRIVATE ROAD /
ALLEYS
TOTAL COMMON OPEN SPACE:

SUB-TOTAL:

SUB-TOTAL:

TOTAL ROAD & ALLEYS:

ROAD & ALLEYS SUMMARY
S:\Projects\1800\1863 Ruby Estates\Calculations\1863 LOT MATRIX 2

Page 308 ends
Page 309 ends

5'-0" Garage 20'-4" x 20'-0"
58'-0" pad a/c Yard 330 sq. ft. 185 s.f. min. easement First Floor 689 s.f. easement Great Room 14'-8" x 14'-10" Kitchen Entry Pdr Porch 49'-0" 4'-0"
3'-6" 5'-6" 6'-0" 7'-0" Recycle Trash Compost UP 17R drop zone Meters Meters Alt. Location Opt. Dr. Dining 11'-1" x 11'-8" 21'-3" 3'-9" 11 l.f. of upper cab. 18 l.f. of lower cab. 3'-6" 26'-0" 20'-6" 4'-0" 4'-0" Primary Bedroom 13'-10" x 15'-8" Bedroom 2 10'-0" x 12'-0" Bedroom 3 10'-0" x 12'-0" Primary Bath W.I.C. 20'-10" l.f. linen Laund. Second Floor 1028 s.f. Hall Bath2 DN 17R 10'-1112" 10'-312" 42" x 60" 2'-1" 46'-11" 3'-9" 25'-0"
28'-6" 14'-7" 3'-10" 2'-1" std. shelf opt. upper cabs. 25'-0" A1.1 FLOOR PLAN 1 0 4 8 12 Scale: 3/16" = 1'-0" 3 BEDROOMS 2.5 BATHS 1,724 S.F. Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022

Page 310 ends

Front Elevation 1A - Farmhouse ROOF PLAN 1 OVERHANG : 12" RAKE : 12" ROOF PITCH :6:12 U.N.O 6:12
6:12
RIDGE
6:12
RIDGE
6:12
RIDGE 4:12 6:12 Possible solar panel location Possible solar panel location Right Elevation Rear Elevation 9'-034" 9'-034" +/- 27'-2" F.F. P.L. P.L. F.F. Siding & Trim occur when Right elev. is at a Corner Lot Left Elevation A1.2 PLAN 1A - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 1A - Material Legend: Flat Concrete Tile Roofing Stucco Finish Cementitious Board and Batt Siding Decorative Gable End Detail Enhanced Head and Sill Trim

Page 311 ends

Front Elevation 1B - Craftsman ROOF PLAN 1 OVERHANG : 18" RAKE : 12" ROOF PITCH :5:12 U.N.O 5:12 5:12 RIDGE 4:12
4:12
RIDGE
4:12
RIDGE
4:12
4:12
RIDGE 4:12
4:12
4:12
R. Possible solar panel location Possible solar panel location VALLEY VALLEY VALLEY VALLEY Right Elevation Rear Elevation 9'-034" 9'-034" +/- 26'-9" F.F. P.L. P.L. F.F. Siding & Trim occur when Right elev. is at a Corner Lot Left Elevation A1.3 PLAN 1B - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 1B - Material Legend: Flat Concrete Tile Roofing Stucco Finish Cementitious Lap Siding Decorative Gable End Detail Enhanced Head and Sill Trim

Page 312 ends

Front Elevation 1C - Spanish ROOF PLAN 1 OVERHANG : 12" RAKE : 12" ROOF PITCH :5:12 U.N.O RIDGE 5:12
RIDGE
5:12
RIDGE 4:12 5:12 5:12 Possible solar panel location Possible solar panel location Possible solar panel location Possible solar panel location 4:12
5:12
RIDGE
4:12

VALLEY VALLEY
VALLEY VALLEY Right Elevation Rear Elevation
9'-034" 9'-034" +/- 26'-8" F.F. P.L. P.L. F.F. Trim occurs when Right elev. is at a Corner Lot Left Elevation A1.4 PLAN 1C - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 1C - Material Legend: Low Profile 'S' Tile Roofing Stucco Finish Decorative Shutters Decorative Gable End Detail Enhanced Head and Sill Trim

Page 313 ends

1B - Right Elevation at Corner Lots1A - Right Elevation at Corner Lots 1C - Right Elevation at Corner Lots A1.5 PLAN 1 CORNER LOT ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022

Page 314 ends
Page 315 ends

Garage 20'-6" x 20'-0"
58'-0" pad a/c Yard 332 sq. ft. 185 s.f. min. easement First Floor 788 s.f. easement Great Room 18'-1" x 21'-6" Kitchen Entry Pdr 49'-0" 4'-0" 36'-0" 3'-6" 29'-0" 3'-6" Recycle Trash Compost UP
17R Meters Drop Zone Meters Alt. Location
7'-0" 6'-0" 4'-0" 5'-6" 4'-0" P. Low Linen Opt. Dr. 3'-6" 21'-5" 7'-7" 22 l.f. of upper cab. 18 l.f. of lower cab. 1'-0" 24'-9" 24'-3" 4'-0"
5'-0"
1'-0"
4'-0" Bath2 Primary Bedroom 15'-0" x 14'-0" Bedroom 2 10'-1" x 10'-5" Bedroom 3 10'-1" x 11'-7" Primary Bath W.I.C. 22'-2" l.f. Laund. DN17R Second Floor 1166 s.f. Hall High Glass High Glass High Glass Loft / Opt. Flex 12'-9" x 13'-9" Linen
5 Shelves 21'-5" 7'-7" 29'-0"
46'-3" 2'-9" 1'-0" 13'-0" 16'-0"
24'-9" 24'-3" DN17R High Glass High Glass Flex 8'-11" x 9'-9" Opt. Flex std. shelf opt. upper cabs. High Glass High Glass 48" x 42" Shelf A2.1 FLOOR PLAN 2 0 4 8 12 Scale: 3/16" = 1'-0" 3 BEDROOMS 2.5 BATHS 1,954 S.F. Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022

Page 316 ends

Front Elevation 2A - Farmhouse ROOF PLAN 2 OVERHANG : 12" RAKE : 6" ROOF PITCH :6:12 U.N.O 6:12
6:12
RIDGE
6:12
6:12
RIDGE 6:12 6:12 RIDGE 6:12
6:12

VALLEY VALLEY
VALLEY VALLEYPossible solar panel location Possible solar panel location Right Elevation Rear Elevation 9'-034" 9'-034" +/- 26'-4" F.F. P.L. P.L. F.F. Siding & Trim occur when Right elev. is at a Corner Lot Left Elevation A2.2 PLAN 2A - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 2A - Material Legend: Flat Concrete Tile Roofing Stucco Finish Decorative Shutters Cementitious Board & Batt Siding Decorative Gable End Detail Enhanced Head and Sill Trim

Page 317 ends

Front Elevation 2B - Craftsman ROOF PLAN 2 OVERHANG : 18" RAKE : 12" ROOF PITCH :4:12 U.N.O 6:12 6:12 RIDGE 4:12
4:12
RIDGE
4:12
4:12
RIDGE 4:12
4:12

VALLEY VALLEY
VALLEY VALLEY Possible solar panel location Possible solar panel location Right Elevation Rear Elevation 9'-034" 9'-034" +/- 26'-4" F.F. P.L. P.L. F.F. Siding & Trim occur when Right elev. is at a Corner Lot Left Elevation A2.3 PLAN 2B - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 2B - Material Legend: Flat Concrete Tile Roofing Stucco Finish Decorative Shutters Cementitious Lap Siding Decorative Gable End Detail Enhanced Head and Sill Trim

Page 318 ends

Front Elevation 2C - Spanish ROOF PLAN 2 OVERHANG : 12" RAKE : 12" ROOF PITCH :6:12 U.N.O 6:12
6:12
RIDGE
4:12
4:12
RIDGE 6:12 6:12 RIDGE 4:12
4:12
VALLEY
VALLEY VALLEYPossible solar panel location Possible solar panel location VALLEY Right Elevation Rear Elevation 9'-034" 9'-034" +/- 26'-4" F.F. P.L. P.L. F.F. Left Elevation A2.4 PLAN 2C - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 2C - Material Legend: Low Profile 'S' Tile Roofing Stucco Finish Decorative Shutters Decorative Gable End Detail Enhanced Head and Sill Trim

Page 319 ends

2B - Right Elevation at Corner Lots2A - Right Elevation at Corner Lots 2C - Right Elevation at Corner Lots A2.5 PLAN 2 CORNER LOT ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022

Page 320 ends
Page 321 ends

Garage 20'-0" x 20'-0" 6'-0" 4'-0"
6'-0" 7'-0" 4'-0"
6'-10" 42'-2" 4'-0"
58'-0" 38'-6" 3'-6" 31'-6" 3'-6" pad a/c Zone Drop coats/ storage UP 17R Porch Bath3 Bedroom 4 10'-0" x 10'-11" Yard 270 sq. ft. 272 s.f. min. Great Room 14'-0" x 13'-6" Dining 16'-0" x 10'-4" easement First Floor 963 s.f. easement 5'-6" Recycle Trash Compost Meters 12'-312" 20'-11" 10'-7" 3'-6" Kitchen 18.5 l.f. of upper cab. 24.5 l.f. of lower cab. 14'-6" 10'-0" 23'-0" 1'-6" 4'-0" Second Floor
5'-0"
5'-0" 1168 s.f. DN 17R Primary Bath Bedroom 3 11'-8" x 11'-1" Bedroom 2 11'-8" x 11'-1" Laund. Primary Bedroom 15'-4" x 15'-10" Bath2 W.I.C. 22'-5" l.f. high glass high glass 6'-6" 12'-11"
Linen
5 Shelves Hall opt. low linen / workspace std. shelf opt. upper cabs. 43'-2" 6'-10"
6'-10" 26'-5" 14'-3" 2'-6" 20'-11" 10'-7" 26'-212" 5'-312" A3.1 FLOOR PLAN 3 0 4 8 12 Scale: 3/16" = 1'-0" 4 BEDROOMS 3 BATHS 2,132 S.F. Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022

Page 322 ends

Front Elevation 3A - Farmhouse ROOF PLAN 3 OVERHANG : 12" RAKE : 12" ROOF PITCH :6:12 U.N.O 6:12
RIDGE
6:12
6:12 4:12 RIDGE
4:12 Possible solar panel location Possible solar panel location 6:12 RIDGE 6:12 VALLEY VALLEY Right Elevation Rear Elevation 8'-1134" 9'-034" +/ 27'-4" F.F. P.L. P.L. F.F. Siding & Trim occur when Right elev. is at a Corner Lot Left Elevation A3.2 PLAN 3A - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 3A - Material Legend: Flat Concrete Tile Roofing Stucco Finish Cementitious Board and Batt Siding Decorative Gable End Detail Enhanced Head and Sill Trim

Page 323 ends

Front Elevation 3B - Craftsman ROOF PLAN 3 OVERHANG : 18" RAKE : 12" ROOF PITCH :5:12 U.N.O 4:12 5:12
4:12
4:12
RIDGE Possible solar panel location Possible solar panel location 4:12
5:12
5:12
RID.

RIDGE
5:12
5:12 5:12 5:12 RIDGE VALLEY VALLEY Right Elevation Rear Elevation 8'-1134" 9'-034" +/ 26'-5" F.F. P.L. P.L. F.F. Siding & Trim occur when Right elev. is at a Corner Lot Left Elevation A3.3 PLAN 3B - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 3B - Material Legend: Flat Concrete Tile Roofing Stucco Finish Cementitious Lap Siding Decorative Gable End Detail Enhanced Head and Sill Trim

Page 324 ends

Front Elevation 3C - Spanish ROOF PLAN 3 OVERHANG : 12" RAKE : 12" ROOF PITCH :6:12 U.N.O4:12 RIDGE 4:12 Possible solar panel location 4:12 RIDGE 4:12
4:12 4:12 RIDGE Possible solar panel location
4:12

RIDGE VALLEY VALLEY
4:12
4:12
RIDGE
VALLEY VALLEY 4:12 Right Elevation Rear Elevation
8'-1134" 9'-034" +/ 27'-8" F.F. P.L. P.L. F.F. Left Elevation A3.2 PLAN 3A - EXTERIOR ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022 0 4 8 16 0 4 8 16 0 4 8 16 0 4 8 16 3C - Material Legend: Low Profile 'S' Tile Roofing Stucco Finish Decorative Shutters Decorative Gable End Detail Enhanced Head and Sill Trim

Page 325 ends

3B- Right Elevation at Corner Lots3A - Right Elevation at Corner Lots 3C - Right Elevation at Corner Lots A3.5 PLAN 3 CORNER LOT ELEVATIONS 0 2 4 8 Architecture + Planning 888.456.5849 ktgy.com # RUBY ESTATES WOODLAND, CA 2021-1319 SCHEMATIC DESIGN MARCH 10, 2022

Page 326 ends
Page 327 ends

82093.0018A\32013354.2
Recorded at request of: )
City Clerk )
City of Woodland )
)
When recorded return to: )
City of Woodland )
300 First Street )
Woodland, CA 95695 )
Attention: City Clerk )
)
______________________________________________________________________________ Exempt from filing fees pursuant to Government Code §6103 DEVELOPMENT AGREEMENT NO. [_____]

RUBY ESTATES

AMENDED AND RESTATED DEVELOPMENT AGREEMENT BETWEEN

CITY OF WOODLAND
and
THE NEW HOME COMPANY NORTHERN CALIFORNIA LLC.

Page 328 ends

AMENDED AND RESTATED DEVELOPMENT AGREEMENT NO. [_____]
This Amended and Restated Development Agreement (hereinafter “Agreement”) is entered into as of this ___ day of ___________, 2022 by and between the City of Woodland, California (“CITY”), and The New Home Company Northern California LLC., a Delaware Limited Liability Company (“OWNER”), each of whom shall be referred to as a “party” and together as the “parties.”

RECITALS
WHEREAS, CITY and Turn of the Century LLC, previously entered into that certain Development Agreement (“Original Development Agreement”) on January 6, 2006, approved by the City Council of the City of Woodland by Ordinance No. 1453 on January 6, 2006, with subsequent second amendment to the DA on July 1, 2014 approved by the City Council of the City of Woodland by Ordinance No. 1595 on July 1, 2014; and WHEREAS, Turn of the Century LLC subsequently transferred its property interests, and associated agreements, to various developers, and OWNER now owns that certain real property with Yolo County Assessor’s Parcel Numbers 042-030-054 (the “Property”); and WHEREAS, this Agreement hereby replaces in its entirety the Original Development Agreement with respect to the Property (as defined below) only; and WHEREAS, CITY is authorized to enter into binding development agreements with persons having legal or equitable interests in real property for the development of such property, pursuant to Section 65864, et seq. of the Government Code; and WHEREAS, CITY has approved the Spring Lake Specific Plan (“Plan”), which encompasses OWNER’s property, more fully described in Exhibit “A” and shown on Exhibit “B” to this Agreement (“Property”), and which requires owners of property within the Plan area to enter into development agreements as a precondition of development; and WHEREAS, OWNER and CITY wish to enter into this Development Agreement pursuant to the Plan, allowing for the construction of a project as described herein (“Project”); and
WHEREAS, OWNER has applied to CITY for certain entitlements for development of its Property, including this Agreement, and proceedings have been taken in accordance with the rules and regulations of CITY; and
WHEREAS, the terms and conditions of this Agreement have undergone extensive review by CITY and OWNER and have been found to be fair, just, and reasonable; and WHEREAS, the best interests of the citizens of the City of Woodland and the public health, safety, and welfare will be served by entering into this Agreement; and

Page 329 ends

WHEREAS, the City Council hereby finds and determines that this Agreement is of major significance because it will enable CITY to fund much needed capital improvements and provide much needed public services and will therefore also have a major, beneficial economic impact on CITY; and
WHEREAS, all of the procedures of the California Environmental Quality Act have been met with respect to the Project and the Agreement, with the Woodland City Council’s certification of the Environmental Impact Report for the Spring Lake Specific Plan (Turn of the Century EIR, SCH #99022069, August 15, 2000) and adoption of addenda to the Turn of the Century EIR; and
WHEREAS, this Agreement and the Project are consistent with the Woodland General Plan and the Spring Lake Specific Plan; and
WHEREAS, all actions taken and approvals given by CITY have been duly taken or approved in accordance with all applicable legal requirements for notice, public hearings, findings, votes, and other procedural matters related to the approval of development agreements; and
WHEREAS, development of the Project in accordance with this Agreement will provide substantial benefits to CITY and will further important policies and goals of CITY; and WHEREAS, this Agreement will eliminate uncertainty in planning and provide for the orderly development of OWNER’s property, ensure progressive installation of necessary improvements, provide for public services appropriate to the development of the Project, and generally serve the purposes for which development agreements under Section 65864, et seq. of the Government Code are intended;

COVENANTS
NOW, THEREFORE, in consideration of the above recitals and of the mutual covenants hereinafter contained and for other good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties agree as follows:

1. DEFINITIONS AND EXHIBITS.

1.1 Definitions. The following terms when used in this Agreement shall be defined as follows:

1.1.1 “Agreement” means this Development Agreement.

1.1.2 “CITY” means the City of Woodland, a California municipal corporation.

Page 330 ends

1.1.3 “City Council” means the duly elected city council of the City of Woodland.

1.1.4 “Commencement Date” means the date the Term of this Agreement commences.

1.1.5 “Development” means the improvement of the Property (as defined herein) for the purposes of completing the structures, improvements and facilities comprising the Project including, but not limited to: grading; the construction of infrastructure and public facilities related to the Project whether located within or outside the Property; the construction of buildings and structures; and the installation of landscaping. “Development” does not include the maintenance, repair, reconstruction or redevelopment of any building, structure, improvement or facility after the construction and completion thereof.

1.1.6 “Development Approvals” means all permits and other entitlements for use subject to approval or issuance by CITY in connection with development of the Property including, but not limited to (i) specific plans and specific plan amendments, (ii) tentative and final subdivision and parcel maps, (iii) conditional use permits, public use permits and plot plans, (iv) zoning and planned development, and (v) grading and building permits.

1.1.7 “Development Exaction” means any requirement of CITY in connection with or pursuant to any Land Use Regulation or Development Approval for the dedication of land, the construction of improvements or public facilities, or the payment of fees in order to lessen, offset, mitigate or compensate for the impacts of development on the environment or other public interests.

1.1.8 “Development Impact Fee” means a monetary exaction other than a tax or special assessment, whether established for a broad class of projects by legislation of general applicability or imposed on a specific project on an ad hoc basis, that is charged by a local agency to the applicant in connection with approval of a development project for the purpose of defraying all or a portion of the cost of public facilities related to the development project, and which may be increased or updated from time to time, but does not include fees for processing applications for governmental regulatory actions or approvals, fees collected under development agreements adopted pursuant to Article 2.5 of the Government Code (commencing with Section 65864) of Chapter 4, or fees collected pursuant to agreements with redevelopment agencies which provide for the redevelopment of property in furtherance or for the benefit of a redevelopment project for which a redevelopment plan has been adopted pursuant to the Community Redevelopment Law (Part 1 (commencing with Section 33000) of Division 24 of the Health and Safety Code).

1.1.9 “Development Plan” means the plan for development of the Property as set forth in Exhibit “C”.

1.1.10 “Effective Date” means the date the ordinance approving and authorizing this Agreement becomes effective.

Page 331 ends

1.1.11 “Land Use Regulations” means all ordinances, resolutions, codes, rules, regulations and official policies of CITY governing the development and use of land, including, without limitation, the permitted use of land, the density or intensity of use, subdivision requirements, the maximum height and size of proposed buildings, the provisions for reservation or dedication of land for public purposes, and the design, improvement and construction standards and specifications applicable to the development of the Property. “Land Use Regulations” does not include any CITY ordinance, resolution, code, rule, regulation or official policy, governing:
(a) the conduct of businesses, professions, and occupations; (b) taxes (special or general) and assessments;
(c) the control and abatement of nuisances;
(d) the granting of encroachment permits and the conveyance of rights and interests that provide for the use of or the entry upon public property; (e) the exercise of the power of eminent domain.

1.1.12 “Mortgagee” means a mortgagee of a mortgage, a beneficiary under a deed of trust or any other security-device lender, and their successors and assigns.

1.1.13 “OWNER” means the persons and entities listed as OWNER on page 1 of this Agreement and their successors in interest to all or any part of the Property.

1.1.14 “Project” means the development of the Property contemplated by the Development Plan as such Plan may be further defined, enhanced or modified pursuant to the provisions of this Agreement.

1.1.15 “Property” means the real property described on Exhibit “A” and shown on Exhibit “B” to this Agreement.

1.1.16 “Reservation of Rights” means the rights and authority excepted from the assurances and rights provided to OWNER under this Agreement and reserved to CITY under Section 3.3 of this Agreement.

1.2 Exhibits. The following documents are attached to, and by this reference made a part of, this Agreement:

Exhibit “A” - Legal Description of the Property
Exhibit “B” - Map showing Property and its location
Exhibit “C” - Tentative Map, Site Plan, Landscape Plan,

Page 332 ends

Architectural Renderings (from the ________, City Council Hearing) Exhibit “D” - Development Standards for Ruby Estates
Exhibit “E” - Conditions of Approval
Exhibit “F” - Fees

2. GENERAL PROVISIONS.

2.1 Binding Effect of Agreement. The Property is hereby made subject to this Agreement. Development of the Property is hereby authorized and shall be carried out in accordance with the terms of the Development Plan and this Agreement.

2.2 Ownership of Property. OWNER represents and covenants that it is the owner of the fee simple title to, or has an equitable interest in, the Property or a portion thereof.

2.3 Term. The term of this Agreement shall commence on the date (the “Commencement Date”) that is the Effective Date, and shall be in force for a period of 10 years thereafter (the “Initial Term”), unless this term is modified or extended pursuant to the provisions of this Agreement. Developer may elect to extend the Term by up to two successive two (2) year periods (for a maximum Term of 14 years) upon written notice to CITY no later than 90 days prior to the date the Term would otherwise expire. Thereafter, the OWNER shall have no vested right under this Agreement, regardless of whether or not OWNER has paid any Development Impact Fee. Any tentative map approved by CITY for the Property shall have a duration co-extensive with the duration of this Agreement.

2.4 Assignment.

2.4.1 Right to Assign. OWNER shall have the right to sell, transfer or assign the Property in whole or in part (provided that no such partial transfer shall violate the Subdivision Map Act, Government Code Section 66410, et seq.) to any person, partnership, joint venture, firm or corporation at any time during the Term of this Agreement; provided, however, that any such sale, transfer or assignment shall include the assignment and assumption of the rights, duties and obligations arising under or from this Agreement and be made in strict compliance with the following conditions precedent:
(a) No sale, transfer or assignment of any right or interest under this Agreement shall be made unless made together with the sale, transfer or assignment of all or a part of the Property.
(b) Concurrent with any such sale, transfer or assignment, OWNER shall notify CITY, in writing, of such sale, transfer or assignment and shall provide CITY with an executed agreement (“Assignment and Assumption Agreement”), in a form reasonably acceptable to CITY, by the purchaser, transferee or assignee and providing therein that the purchaser, transferee or assignee expressly and unconditionally assumes all the duties,

Page 333 ends

obligations, agreements, covenants, waivers of OWNER under this Agreement, including, without limitation, the covenants not to sue and waivers contained in Sections 7.2 and 8.4 hereof.

Any sale, transfer or assignment not made in strict compliance with the foregoing conditions shall constitute a default by Owner under this Agreement. Notwithstanding the failure of any purchaser, transferee or assignee to execute the agreement required by Paragraph (b) of this Subsection 2.4.1, the burdens of this Agreement shall be binding upon such purchaser, transferee or assignee, but the benefits of this Agreement shall not inure to such purchaser, transferee or assignee until and unless such agreement is executed.

2.4.2 Release of Transferring Owner. Notwithstanding any sale, transfer or assignment, a transferring OWNER shall continue to be obligated under this Agreement with respect to the transferred Property or any transferred portion thereof, unless such transferring OWNER is given a release in writing by CITY (which written confirmation may be in the form of execution and recordation of the Assignment and Assumption Agreement), which release shall be provided by CITY upon the full satisfaction by such transferring OWNER of the following conditions:
(a) OWNER no longer has a legal or equitable interest in all or any part of the Property subject to the transfer.
(b) OWNER is not then in default under this Agreement.
(c) OWNER has provided CITY with the notice and executed agreement required under Paragraph (b) of Subsection 2.4.1 above. (d) The purchaser, transferee or assignee provides CITY with security equivalent to any security previously provided by OWNER to secure performance of its obligations hereunder.

2.4.3 Subsequent Assignment. Any subsequent sale, transfer or assignment after an initial sale, transfer or assignment shall be made only in accordance with and subject to the terms and conditions of this Section.

2.4.4 Utilities. The Project shall be connected to all utilities necessary to provide adequate water, sewer, gas, electric, and other utility service to the Project, prior to the issuance of a certificate of occupancy for any portion of the Project.

2.4.5 Sale to Public and Completion of Construction. The provisions of Subsection 2.4.1 shall not apply to the sale or lease (for a period longer than one year) of any lot that has been finally subdivided and is individually (and not in “bulk”) sold or leased to a member of the public or other ultimate user. This Agreement shall terminate with respect to any lot and such lot shall be released and no longer be subject to this Agreement without the execution or recordation of any further document upon satisfaction of both of the following conditions:

Page 334 ends

(a) The lot has been finally subdivided and individually (and not in “bulk”) sold or leased (for a period longer than one year) to a member of the public or other ultimate user; and
(b) A certificate of occupancy has been issued for a building on the lot, and the fees for such lot set forth in this Agreement have been paid.

2.5 Amendment or Cancellation of Agreement. This Agreement may be amended or canceled in whole or in part only by written consent of all parties in the manner provided for in Government Code Section 65868. This provision shall not limit any remedy of CITY or OWNER as provided by this Agreement.

2.6 Termination. This Agreement shall be deemed terminated and of no further effect upon the occurrence of any of the following events:
(a) Expiration of the stated Term of this Agreement as set forth in Section 2.3. (b) Entry of a final judgment setting aside, voiding or annulling the adoption of the ordinance approving this Agreement.
(c) The adoption of a referendum measure overriding or repealing the ordinance approving this Agreement.
(d) Completion of the Project in accordance with the terms of this Agreement including issuance of all required occupancy permits and acceptance by CITY or applicable public agency of all required dedications.

Termination of this Agreement shall not constitute termination of any other land use entitlements approved for the Property. Upon the termination of this Agreement, no party shall have any further right or obligation hereunder except with respect to any obligation to have been performed prior to such termination or with respect to any default in the performance of the provisions of this Agreement that has occurred prior to such termination or with respect to any obligations that are specifically set forth as surviving this Agreement. Upon such termination, any Development Impact Fees paid by OWNER to CITY for residential units on which construction has not yet begun shall be refunded to OWNER by CITY.

Automatic Termination as to Residential Lots/Notice of Termination as to Other Parcels. This Agreement shall automatically be terminated, without any further action by any party or need to record any additional document, with respect to any single family residential lot with a parcel designated by the Development Approvals for residential use, upon completion of construction and issuance by CITY of a final occupancy permit for a dwelling unit upon such single family residential lot and the conveyance of such improved residential lot and dwelling unit to a bona-fide good faith purchaser thereof. In connection with its issuance of a final inspection for the single family residential lot and dwelling unit, CITY shall confirm that all improvements that are required to serve the residential lot, as determined by CITY, have (1) been

Page 335 ends

accepted by CITY, or (2) in CITY’s discretion, adequate security for certain improvements has been provided, and that the dwelling is ready for occupancy by the homebuyer. Termination of this Agreement for any single family residential lot as provided for in this Section shall not in any way be construed to terminate or modify any assessment district, fee district, public financing district, special tax district, tax and / or any Mello Roos Community Facilities District lien affecting such lot at the time of termination. Termination of this Agreement as to an individual parcel or lot with a building constructed upon it shall not affect Developer’s rights or obligations under any of the Development Approvals applicable to the remainder of the Project at the Property.

2.7 Notices.
(a) As used in this Agreement, “notice” includes, but is not limited to, the communication of notice, request, demand, approval, statement, report, acceptance, consent, waiver, appointment or other communication required or permitted hereunder. (b) All notices shall be in writing and shall be considered given either: (i) when delivered in person to the recipient named below; or (ii) on the date of delivery shown on the return receipt, after deposit in the United States mail in a sealed envelope as either registered or certified mail with return receipt requested, and postage and postal charges prepaid, and addressed to the recipient named below; or (iii) on the date of delivery shown in the records of the telegraph company after transmission by telegraph to the recipient named below. All notices shall be addressed as follows:

If to CITY:

City of Woodland
300 First Street
Woodland, CA 95695
Attn: City Manager
Telephone: (530) 661-5800
Facsimile: (530) 661-5848
Copy to:

Best, Best & Krieger
500 Capitol Mall, Suite 1700
Sacramento, CA 95814
Attn: Woodland City Attorney
Telephone: (916) 325-4000
Facsimile: (916) 325-4010
If to OWNER:

The New Home Company Northern California LLC.
1508 Eureka Road, Suite 290

Page 336 ends

Roseville, CA 95661
Attn: Justin Walters
Telephone: 916-757-1197
(c) Either party may, by notice given at any time, require subsequent notices to be given to another person or entity, whether a party or an officer or representative of a party, or to a different address, or both. Notices given before actual receipt of notice of change shall not be invalidated by the change.

2.8 Termination of Previous Agreement. As related to the Property only, this Agreement replaces and supersedes the Original Development Agreement approved by Ordinance No 1563, adopted on June 17, 2014, with subsequent second amendment to the DA on December 15, 2015 approved by the City Council of the City of Woodland by Ordinance No. 1595 on June 15, 2015. As of the effective date of the ordinance adopting this Development Agreement, the Original Development Agreement shall terminate and shall have no further force or effect with respect to the Property.

3. DEVELOPMENT OF THE PROPERTY.

3.1 Rights to Develop.

3.1.1 CITY and OWNER acknowledge that this Agreement has been prepared and executed in order to comply with the requirement in the Spring Lake Specific Plan that a development agreement be entered into in connection with any rezoning of land or tentative parcel map approval within the Specific Plan area. This agreement is for Tentative Subdivision Map #5221, Planned Development Overlay, and Site Plan and Design Review which includes the 7.03 acre R-15 (R-15PD) project site resulting in 87 single family lots.

3.2 Effect of Agreement on Land Use Regulations. Except as otherwise provided under the terms of this Agreement including the Reservation of Rights, the rules, regulations and official policies governing permitted uses of the Property, the density and intensity of use of the Property, the maximum height and size of proposed buildings, and the design, improvement and construction standards and specifications applicable to development of the Property shall be the Land Use Regulations and Development Approvals, whether in effect on the Effective Date or subsequently adopted. In connection with any subsequently imposed Development Approvals and except as specifically provided otherwise herein, CITY may exercise its discretion in accordance with the Land Use Regulations then in effect, as provided by this Agreement, including, but not limited to, the Reservation of Rights. CITY shall accept for processing, review and action all applications for subsequent development approvals, and such applications shall be processed in the same manner and the CITY shall exercise its discretion, when required or authorized to do so, to the same extent it would otherwise be entitled in the absence of this Agreement.

Page 337 ends

3.3 Reservation of Rights.

3.3.1 Limitations, Reservations and Exceptions. Notwithstanding any other provision of this Agreement, the following regulations shall apply to the development of the Property:
(a) Processing fees and charges of every kind and nature imposed by CITY to cover the estimated actual costs to CITY of processing applications for Development Approvals or for monitoring compliance with any Development Approvals granted or issued. (b) Procedural regulations relating to hearing bodies, petitions, applications, notices, findings, records, hearings, reports, recommendations, appeals and any other matter of procedure.
(c) Regulations, adopted policies and rules governing engineering and construction standards and specifications applicable to public and private improvements, including, without limitation, all uniform codes adopted by the CITY and any local amendments to those codes adopted by the CITY, including, without limitation, the CITY’s Building Code, Plumbing Code, Mechanical Code, Electrical Code, and Grading Ordinance. (d) Regulations imposing Development Exactions; provided, however, that no such subsequently adopted Development Exaction shall be applicable to development of the Property unless such Development Exaction is applied uniformly to development, either throughout the CITY or within a defined area of benefit which includes the Property. No such subsequently adopted Development Exaction shall apply if its application to the Property would physically prevent development of the Property for the uses and to the density or intensity of development set forth in the Development Plan. In the event any such subsequently adopted Development Exaction fulfills the same purposes, in whole or in part, as the fees set forth in Section 4 of this Agreement, CITY shall allow a credit against such subsequently adopted Development Exaction for the fees paid under Section 4 of this Agreement to the extent such fees fulfill the same purposes.
(e) Regulations that may be in material conflict with this Agreement but that are reasonably necessary to protect the residents of the project or the immediate community from a condition perilous to their health or safety. To the extent possible, any such regulations shall be applied and construed so as to provide OWNER with the rights and assurances provided under this Agreement.
(f) Regulations that are not in material conflict with this Agreement or the Development Plan. Any regulation, whether adopted by initiative or otherwise, limiting the rate or timing of development of the Property shall be deemed to materially conflict with the Development Plan and shall therefore not be applicable to the development of the Property. (g) Regulations that are in material conflict with the Development Plan; provided OWNER has given written consent to the application of such regulations to

Page 338 ends

development of that Property in which the OWNER has a legal or equitable interest. (h) Regulations that impose, levy, alter or amend fees, charges, or Land Use Regulations relating to consumers or end users, including, without limitation, trash can placement, service charges and limitations on vehicle parking. (i) Regulations of other public agencies, including Development Impact Fees adopted or imposed by such other public agencies, although collected by CITY.

3.3.2 Subsequent Development Approvals. This Agreement shall not prevent CITY, in acting on subsequent development approvals and to the same extent it would otherwise be authorized to do so absent this Agreement, from applying subsequently adopted or amended Land Use Regulations that do not materially conflict with this Agreement.

3.3.3 Modification or Suspension by State or Federal Law. In the event that State, County or Federal laws or regulations, enacted after the Effective Date of this Agreement, prevent or preclude compliance with one or more of the provisions of this Agreement, such provisions of this Agreement shall be modified or suspended as may be necessary to comply with such State or Federal laws or regulations; provided, however, that this Agreement shall remain in full force and effect to the extent it is not inconsistent with such laws or regulations and to the extent such laws or regulations do not render such remaining provisions impractical to enforce.

3.3.4 Intent. The parties acknowledge and agree that CITY is restricted in its authority to limit certain aspects of its police power by contract and that the foregoing limitations, reservations and exceptions are intended to reserve to CITY all of its police power that cannot be or are not expressly so limited. This Agreement shall be construed, contrary to its stated terms if necessary, to reserve to CITY all such power and authority that cannot be or is not by this Agreement’s express terms so restricted.

3.4 Regulation by Other Public Agencies. It is acknowledged by the parties that other public agencies not within the control of CITY may possess authority to regulate aspects of the development of the Property separately from or jointly with CITY and this Agreement does not limit the authority of such other public agencies.

3.5 Timing of Development. The parties acknowledge that OWNER cannot at this time predict when or the rate at which phases of the Property will be developed. Such decisions depend upon numerous factors which are not within the control of OWNER, such as market orientation and demand, interest rates, absorption, completion and other similar factors. Since the California Supreme Court held in Pardee Construction Co. v. City of Camarillo (1984) 37 Ca1.3d 465, that the failure of the parties therein to provide for the timing of development resulted in a later adopted initiative restricting the timing of development to prevail over such parties’ agreement, it is the parties’ intent to cure that deficiency by acknowledging and providing that OWNER shall have the right to develop the Property in such order and at such rate and at such times as OWNER deems appropriate within the exercise of its subjective

Page 339 ends

business judgment, subject only to any timing or phasing requirements set forth in the Development Plan.

3.6 Public Works. If OWNER is required by this Agreement to construct any public works facilities which will be dedicated to CITY or any other public agency upon completion, and if required by applicable laws to do so, OWNER shall perform such work in the same manner and subject to the same requirements as would be applicable to CITY or such other public agency should it have undertaken such construction.

3.7 Acquisition of Property for Construction of Improvements Off-Site. OWNER shall, in a timely manner as determined by CITY and consistent with the requirements of the Specific Plan, acquire the property rights necessary to construct or otherwise provide the public improvements contemplated by the Specific Plan.

3.8 Acquisition of Real Property Interests. In any instance where OWNER is required to construct any public improvement on land not owned by OWNER, OWNER shall at its sole cost and expense provide or cause to be provided, the real property interests necessary for the construction of such public improvements. If and to the extent this section 3.8 conflicts with Section 66462.5 of the Subdivision Map Act, this section will control.

3.9 Credits and/or Reimbursement for Dedication of Property or Construction of Infrastructure. To the extent OWNER dedicates land, funds or constructs public facilities that exceed the size or capacity required to serve the Property for the benefit of other properties, or if such dedication or improvements benefit other properties regardless of its size or capacity, CITY shall enter into an agreement to reimburse OWNER to the extent of such benefit as determined by CITY. Such reimbursement may take the form of fee credits and/or benefit assessments, special taxes, or other fees or assessments collected from benefiting properties, as the CITY may determine. Notwithstanding the foregoing, the CITY shall not reimburse the OWNER for costs of interim temporary improvements, nor shall CITY require OWNER to pay for interim temporary improvements installed by others on OWNER’s property. If OWNER’s costs for the improvements exceeds the amount(s) shown in the Spring Lake Capital Improvement Program for such improvement(s), OWNER agrees that the CITY may defer a portion of OWNER’s reimbursement for constructed improvements until the CITY completes a reconciliation update for the Spring Lake Infrastructure Fee (“SLIF”).

3.10 Water Supply Planning. To the extent the Development Plan includes one or more tentative maps totaling more than 500 dwelling units, and to the extent the Project, or any part thereof, is not exempt under Government Code Section 66473.7(i), each such tentative map shall comply with the provisions of Government Code Section 66473.7.

3.11 City Plan Check & Inspection of Public & Private Civil Improvements. Developer shall, at its sole cost, expense, and liability, pay all fees, charges, and taxes arising out of construction of the Public & Private Improvements, including, but not limited to fees for the checking, filing, and processing of improvement plans and specifications and for inspecting the construction of the onsite & offsite civil improvements. These fees must be paid in full prior to approval of the final map and improvement plans.

Page 340 ends

4. PUBLIC BENEFITS.

4.1 Intent. The parties acknowledge and agree that development of the Property will result in substantial public needs that will not be fully met by the Development Plan and further acknowledge and agree that this Agreement confers substantial private benefits on OWNER that should be balanced by commensurate public benefits. Accordingly, the parties intend to provide consideration to the public to balance the private benefits conferred on OWNER by providing more fully for the satisfaction of the public needs resulting from the Project.

4.2 Development Impact Fees.

4.2.1 Amount of Fee. The Development Impact Fees and other fees set forth in Exhibit “F” shall be charged to the Project (subject to annual CCI).

4.2.2 Time of Payment. The fees required pursuant to Subsection 4.2.1 shall be paid to CITY prior to the issuance of building permits for each residential unit. No fees shall be payable for building permits issued prior to the Effective Date of this Agreement, but the fees required pursuant to Subsection 4.2.1 shall be paid prior to the re-issuance or extension of any building permit for a residential unit for which such fees have not previously been paid.

4.2.3 Fee Credits and Reimbursements. OWNER shall be entitled to credit or reimbursement against the fees required pursuant to Subsection 4.2.1 for the dedication of land, the construction of improvements or the payment of fees as specifically set forth in an agreement entered into between CITY and OWNER pursuant to Section 3.9

4.2.4 Future Development Impact Fees; Increases. The Parties hereby agree that, in addition to the Development Impact Fees included in Exhibit “F”, the Project shall be subject to the imposition of any Development Impact Fee that becomes effective after the Effective Date. In addition, the Project shall be subject to any increase, decrease, amendment or alteration of any Development Impact Fee that becomes effective after the Effective Date.

4.2.5 Prepayment. In no event shall the prepayment of any Development Impact Fees required hereunder establish a vested right on the part of OWNER or any other owner of the Property or any person or entity with an interest therein to develop the Project or the Property following the expiration, cancellation or termination of the Term of this Agreement.

Following the expiration, cancellation or termination of this Agreement, all Development Impact Fees then in effect shall be applicable to the Project and Property notwithstanding any provision of this Agreement and notwithstanding the prepayment of the Development Impact Fees set forth in Exhibit “F”, any increase or amendment of any Development Impact Fee, or any combination thereof. Nothing contained in this Subsection 4.2.5 shall be construed as limiting the right of OWNER to a credit against any Development Impact Fees as set forth in Section

4.2.3 hereof.

Page 341 ends

4.3 Agricultural Conservation Easements. CITY has established specific criteria for agricultural conservation easements, as provided in CITY’s Agricultural Mitigation Program.

With respect to the Property, the City’s agricultural conservation easement requirement has been satisfied.

4.4 Swainson’s Hawk Mitigation. In addition to the requirements of Section 4.3 above, OWNER’s obligation for Swainson’s Hawk Mitigation has been satisfied.

4.5 Dedication of On-Site Easements and Rights of Way. OWNER shall dedicate to CITY all on-site rights of way and easements deemed necessary for public improvements, in CITY's sole discretion, within 15 days of receipt of written demand from CITY.

4.6 Timing of Construction of Off-Site Infrastructure. Approval of any building permits on the Property shall be conditioned upon CITY’s determination, in its sole discretion, that sufficient progress is being made on construction of off-site infrastructure serving development of OWNER's Property.

4.7 Assigned Building Unit Allocations. OWNER agrees that CITY shall not approve any final subdivision map unless each lot to be subdivided thereby has a building unit allocation assigned to it pursuant to CITY’s building unit allocation ordinance.

4.8 Affordable Housing In-Lieu Fee. CITY and OWNER agree that OWNER shall pay an affordable housing in-lieu fee to meet the affordability requirement applied to this Project. The Project is responsible for providing 9 low income units. The very low income unit obligation has been previously met. In lieu of constructing the affordable housing units, OWNER agrees to pay to CITY, or non-profit organization of CITY’s choice for the purpose of constructing housing in Woodland for low income households, a total of Three Thousand Nine Hundred Dollars and No Cents ($3,900) per unit for each of the 87 mapped units for a total of Three Hundred Thirty Nine Thousand Three Hundred Dollars and No Cents ($339,300). The affordable housing in lieu fee shall be paid at time of building permit. The affordable housing fee shall be subject to annual CCI increases.

4.9 General Purpose Fee. CITY and OWNER agree that owner shall pay to CITY a total of Five Thousand Dollars and No Cents ($5,000) per unit for each of the 87 mapped units for a total of One Hundred and Four Hundred Thirty Five Thousand Dollars and No Cents ($435,000) as a general purpose fee. City shall use this general purpose fee to improve bicycle and pedestrian connectivity, including but not limited to construction of the planned Highway 113 bike/pedestrian overcrossing, and complete other neighborhood enhancements within the Plan Area. The general purpose fee shall be paid in one lump sum amount upon final map (excluding model homes) for the Property. The general purpose fee shall be subject to annual CCI increases.

4.10 Financing Plan Cost Estimates. Notwithstanding any fee amounts listed in Exhibit “D,” OWNER acknowledges and agrees that the cost estimates contained in the Spring Lake Specific Plan Financing Plan and Capital Improvement Plan (CIP) are estimates only, and that OWNER shall pay its share of the costs of improvements and amenities identified in the

Page 342 ends

Financing Plan in amounts to be determined by CITY, which may be more or less than the estimates contained in the Financing Plan.

4.11 Infrastructure and Improvements. Prior to receiving a building permit for the Project, OWNER shall either have: (i) applied for and received a subdivision map for the Property, and have entered into a new development agreement with CITY or an amendment to this Agreement, or (ii) submitted plans for infrastructure and improvements necessary to serve the Project in accordance with CITY standards and received approval of such plans by the City Engineer.

4.12 Right of Way. OWNER shall obtain all necessary rights of way for public improvements prior to final map. Should OWNER be unable to acquire rights of way with a good faith effort based on a MAI appraisal, OWNER may request CITY acquire the necessary offsite right of way, OWNER shall fund all CITY costs and shall deposit Two Hundred Thousand Dollars ($200,000.00) with the first final map that triggers right of way acquisition.

Right of Way acquisition costs for off-site SLIF covered improvements are eligible for SLIF reimbursement. CITY will allow a map to proceed with the $200,000 deposit. OWNER may deposit funds in Fifty Thousand Dollar ($50,000.00) increments for CITY acquisition; however, a final map will not be approved with less than a $200,000 deposit.

4.13 Storm Drainage. OWNER understands and acknowledges that, at the time of execution of the Development Agreement and imposition of these conditions, the CITY lacks sufficient storm drain capacity to serve the Project and that City Engineering staff is reviewing multiple options for increasing storm water capacity of the Spring Lake drainage system downstream of the project. Depending on the option selected, the implementation of one or more of the options currently being studied may result in an increase to the Spring Lake Drainage Fee.

If such an increase occurs, Owner agrees to pay its proportional share of the increased Spring Lake Drainage Fee at the time building permits are issued for the Project.

OWNER understands and agrees that it will proceed to build its Project at its own risk and unconditionally releases and discharges CITY and its officers and employees from any and all claims, demands, liabilities, damages, obligations, actions, or causes of action of any kind, known or unknown, past or present, arising out of, relating to, or in connection with the insufficient storm drain capacity (“Claims”). OWNER agrees to refrain from instituting, initiating, maintaining, or participating in any lawsuit, claim, or other proceeding in any jurisdiction or forum relating in any way to the Claims and understands that this release may be pled as a full and complete defense to, and may be used as the basis for an injunction against, any lawsuit, suit, or other proceeding that may be instituted, prosecuted, or attempted in breach of this release. The release in this section is intended to be complete and final and to cover claims, demands, liabilities, damages, actions, and causes of action that are known, but also claims, demands, liabilities, damages, actions, and causes of action that are unknown or that the OWNER does not suspect to exist in their favor that, if known at the time of signing this Agreement, might have affected their actions, and therefore the parties expressly waive the benefit of the provision of section 1542 of the California Civil Code, which provides:

Page 343 ends

A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS WHICH THE

CREDITOR DOES NOT KNOW OR SUSPECT TO EXIST IN HIS OR HER

FAVOR AT THE TIME OF EXECUTING THE RELEASE, WHICH IF

KNOWN BY HIM OR HER MUST HAVE MATERIALLY AFFECTED HIS
OR HER SETTLEMENT WITH THE DEBTOR.

By initialing below, OWNER hereby waives and relinquishes all rights and benefits that it has or may have had under Section 1542 of the California Civil Code or the law of any other state, country, or jurisdiction to the same or similar effect to the full extent that they may lawfully waive such rights.
_______________
Owner’s Initials
Further, OWNER understands that a property owner(s) downstream of OWNER’s Project may be adversely affected in the event of a large storm and that development of OWNER’s Project may exacerbate downstream overflow. If CITY receives a claim from, or has a lawsuit filed against it by, a downstream property owner(s), OWNER agrees to participate in the defense and contribute its proportionate share of the damages its Project caused to CITY.

4.14 Meter Fees. Prior to any final map, OWNER shall pay AMR (Automated Meter Reading) fees for public meters in accordance with the current fee schedule. For reference, the 2021 AMR fee is $236 per meter.

4.15 SR102 and 25A Interchange. OWNER acknowledges that the interim upgrade of the County Road 102 (“Co Rd 102”) and County Road 25A interchange in accordance with the Spring Lake EIR is a Spring Lake responsibility. OWNER accepts and supports the use of Spring Lake Infrastructure Bond proceeds for the upgrade of the Co Rd 102 and 25A interchange. OWNER further accepts and supports that there may be changes to the SLIF and the per unit set aside amount for the payment of Spring Lake Infrastructure Fees due to the Co Rd 102 and 25A interchange project.

4.16 Homeowners Association. Prior to approval of the first final map, OWNER agrees to form a Home Owners Association (HOA). OWNER agrees that the HOA’s governing documents shall include requirements addressing, among other things, ownership, operation, and maintenance of onsite streets, lighting, landscaping, and storm drain. On site streets shall be privately owned and maintained by the HOA.

4.17 Garage Parking Requirement. The HOA’s governing documents shall also include rules requiring garages to be free of clutter and accessible for the parking of two vehicles as well as the use and allocation of on-site outside parking spaces. First and second vehicles of a household shall park in the household’s garage. Outside onsite parking spaces shall not be used for regular parking of household vehicles except when two (2) household vehicles are already parked in a garage. Storage of RVs or boats shall be prohibited in outside onsite parking spaces.

HOA rules shall require the Board to cooperate with the City in addressing any neighborhood complaints.

Page 344 ends

5. FINANCING OF PUBLIC IMPROVEMENTS. OWNER may propose, and if requested by CITY shall cooperate in, the formation of any special assessment district, community facilities district or alternate financing mechanism to pay for the construction and/or maintenance and operation of public infrastructure facilities required as part of the Development Plan. To the extent any such district or other financing entity is formed and sells bonds in order to finance such reimbursements, OWNER may be reimbursed to the extent that OWNER spends funds or dedicates land for the establishment of public facilities. Notwithstanding the foregoing, it is acknowledged and agreed by the parties that nothing contained in this Agreement shall be construed as requiring CITY or the City Council to form any such district or to issue and sell bonds.

6. REVIEW FOR COMPLIANCE.

6.1 Periodic Review. CITY shall review this Agreement annually, on or before the anniversary of the Effective Date, in order to ascertain the compliance by OWNER with the terms of this Agreement. OWNER shall submit an Annual Monitoring Report, in a form acceptable to the City Manager, within thirty (30) days after written notice from the City Manager. The Annual Monitoring Report shall be accompanied by an annual review and administration fee sufficient to defray the estimated costs of review and administration of the Agreement during the succeeding year. The amount of the annual review and administration fee shall be set annually by resolution of the City Council.

6.2 Special Review. The City Council may order a special review of compliance with this Agreement at any time. The Community Development Director, or his or her designee, shall conduct such special reviews.

6.3 Procedure.
(a) During either a periodic review or a special review, OWNER shall be required to demonstrate good faith compliance with the terms of the Agreement. The burden of proof on this issue shall be on OWNER.
(b) Upon completion of a periodic review or a special review, the Community Development Director, or his or her designee, shall submit a report to the Planning Commission setting forth the evidence concerning good faith compliance by OWNER with the terms of this Agreement and his or her recommended finding on that issue. (c) If the Planning Commission finds and determines on the basis of substantial evidence that OWNER has complied in good faith with the terms and conditions of this Agreement, the review shall be concluded.
(d) If the Planning Commission finds and determines on the basis of substantial evidence that OWNER has not complied in good faith with the terms and conditions of this Agreement, the Commission may recommend to the City Council modification or termination of this Agreement. OWNER may appeal a Planning Commission determination

Page 345 ends

pursuant to this Section 6.3(d) pursuant to CITY’s rules for consideration of appeals in zoning matters then in effect. Notice of default as provided under Section 7.3 of this Agreement shall be given to OWNER prior to or concurrent with proceedings under Section 6.4 and Section 6.5.

6.4 Proceedings Upon Modification or Termination. If, upon a finding under Section

6.3, CITY determines to proceed with modification or termination of this Agreement, CITY shall give written notice to OWNER of its intention so to do. The notice shall be given at least ten (10) calendar days prior to the scheduled hearing and shall contain:
(a) The time and place of the hearing;
(b) A statement as to whether or not CITY proposes to terminate or to modify the Agreement; and,
(c) Such other information that the CITY considers necessary to inform OWNER of the nature of the proceeding.

6.5 Hearing on Modification or Termination. At the time and place set for the hearing on modification or termination, OWNER shall be given an opportunity to be heard. OWNER shall be required to demonstrate good faith compliance with the terms and conditions of this Agreement. The burden of proof on this issue shall be on OWNER. If the City Council finds, based upon substantial evidence, that OWNER has not complied in good faith with the terms or conditions of the Agreement, the City Council may terminate this Agreement or modify this Agreement and impose such conditions as are reasonably necessary to protect the interests of the CITY. The decision of the City Council shall be final.

6.6 Certificate of Agreement Compliance. If, at the conclusion of a Periodic or Special Review, OWNER is found to be in compliance with this Agreement, CITY shall, upon request by OWNER, issue a Certificate of Agreement Compliance (“Certificate”) to OWNER stating that after the most recent Periodic or Special Review and based upon the information known or made known to the Community Development Director and City Council that: (1) this Agreement remains in effect; and (2) OWNER is not in default. The Certificate shall be in recordable form, shall contain information necessary to communicate constructive record notice of the finding of compliance, shall state whether the Certificate is issued after a Periodic or Special Review and shall state the anticipated date of commencement of the next Periodic Review. OWNER may record the Certificate with the County Recorder.

Whether or not the Certificate is relied upon by assignees or other transferees or OWNER, CITY shall not be bound by a Certificate if a default existed at the time of the Periodic or Special Review, but was concealed from or otherwise not known to the Community Development Director or City Council.

7. DEFAULT AND REMEDIES.

Page 346 ends

7.1 Remedies in General. It is acknowledged by the parties that CITY would not have entered into this Agreement if it were to be liable in damages under this Agreement, or with respect to this Agreement or the application thereof. In general, each of the parties hereto may pursue any remedy at law or equity available for the breach of any provision of this Agreement, except that CITY shall not be liable in damages to OWNER, or to any successor in interest of OWNER, or to any other person, and OWNER covenants not to sue for damages or claim any damages:
(a) For any breach of this Agreement or for any cause of action that arises out of this Agreement; or
(b) For the taking, impairment or restriction of any right or interest conveyed or provided under or pursuant to this Agreement; or
(c) Arising out of or connected with any dispute, controversy or issue regarding the application or interpretation or effect of the provisions of this Agreement.

7.2 Release. Except for non-monetary remedies, OWNER, for itself, its successors and assignees, hereby releases CITY, its officers, agents and employees from any and all claims, demands, actions, or suits of any kind or nature arising out of any liability, known or unknown, present or future, including, but not limited to, any claim or liability, based or asserted, pursuant to Article I, Section 19 of the California Constitution, the Fifth and Fourteenth Amendments to the United States Constitution, or any other law or ordinance which seeks to impose any other liability or damage, whatsoever, upon CITY because it entered into this Agreement or because of the terms of this Agreement. OWNER hereby acknowledges that it has read and is familiar with the provisions of California Civil Code Section 1542, which is set forth below:

A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS

WHICH THE CREDITOR DOES NOT KNOW OR SUSPECT

TO EXIST IN HIS OR HER FAVOR AT THE TIME OF

EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM

OR HER MUST HAVE MATERIALLY AFFECTED HIS OR
HER SETTLEMENT WITH THE DEBTOR.

By initialing below, OWNER hereby waives the provisions of Section 1542 in connection with the matters that are the subject of the foregoing waivers and releases. _______________
Owner’s Initials

7.3 Termination or Modification of Agreement for Default of OWNER. CITY may terminate or modify this Agreement for any failure of OWNER to perform any material duty or obligation of OWNER under this Agreement, or to comply in good faith with the terms of this Agreement (hereinafter referred to as "default"); provided, however, CITY may terminate or

Page 347 ends

modify this Agreement pursuant to this Section only after providing written notice to OWNER of default setting forth the nature of the default and the actions, if any, required by OWNER to cure such default and, where the default can be cured, OWNER has failed to take such actions and cure such default within sixty (60) days after the effective date of such notice or, in the event that such default cannot be cured within such sixty (60) day period but can be cured within a longer time, has failed to commence the actions necessary to cure such default within such sixty (60) day period and to diligently proceed to complete such actions and cure such default.

8. LITIGATION.

8.1 General Plan Litigation. CITY has determined that this Agreement is consistent with its General Plan, and that the General Plan meets all requirements of law. OWNER has reviewed the General Plan and concurs with CITY’s determination. CITY shall have no liability in damages under this Agreement for any failure of CITY to perform under this Agreement or the inability of OWNER to develop the Property as contemplated by the Development Plan of this Agreement as the result of a judicial determination that on the Effective Date, or at any time thereafter, the General Plan, or portions thereof, as it may be amended from time to time, is invalid or inadequate or not in compliance with law.

8.2 Third Party Litigation Concerning Agreement. OWNER shall defend, at its expense, including attorneys’ fees, indemnify, and hold harmless CITY, its agents, officers and employees from any claim, action or proceeding against CITY, its agents, officers, or employees to attack, set aside, void, or annul the approval of this Agreement, or the approval of any permit granted pursuant to this Agreement. CITY shall promptly notify OWNER of any claim, action, proceeding or determination included within this Section 8.2, and CITY shall cooperate in the defense. CITY may in its discretion participate in the defense of any such claim, action, proceeding or determination.

8.3 Environmental Assurances. OWNER shall indemnify and hold CITY, its officers, agents, and employees free and harmless from any liability, based or asserted, upon any act or omission of OWNER, its officers, agents, employees, subcontractors, predecessors in interest, successors, assigns and independent contractors for any violation of any federal, state or local law, ordinance or regulation relating to industrial hygiene or to environmental conditions on, under or about the Property, including, but not limited to, soil and groundwater conditions, and OWNER shall defend, at its expense, including attorneys’ fees, CITY, its officers, agents and employees in any action based or asserted upon any such alleged act or omission. CITY may in its discretion participate in the defense of any such action.

8.4 Indemnity. In addition to the provisions of sections 8.1, 8.2, and 8.3 above, OWNER shall indemnify and hold CITY, its officers, agents, employees and independent contractors free and harmless from any liability whatsoever, based or asserted upon any act or omission of OWNER, its officers, agents, employees, subcontractors and independent contractors, for property damage, bodily injury, or death (OWNER’s employees included) or any other element of damage of any kind or nature, relating to or in any way connected with or arising from the activities contemplated hereunder, including, but not limited to, the study,

Page 348 ends

design, engineering, construction, completion, failure and conveyance of the public improvements, save and except claims for damages arising through the sole active negligence or sole willful misconduct of CITY. OWNER shall defend, at its expense, including attorneys’ fees, CITY, its officers, agents, employees and independent contractors in any legal action based upon such alleged acts or omissions. CITY may in its discretion participate in the defense of any such legal action.

8.5 Reservation of Rights. With respect to Sections 8.1, 8.2, 8.3, and 8.4 herein, CITY reserves, the right to either (1) approve the attorney(s) that the indemnifying party selects, hires or otherwise engages to defend the indemnified party hereunder, which approval shall not be unreasonably withheld, or (2) conduct its own defense; provided, however, that the indemnifying party shall reimburse the indemnified party forthwith for any and all reasonable expenses incurred for such defense, including attorneys’ fees, upon billing and accounting therefor.

8.6 Challenge to Existing Land Use Approvals. By accepting the benefits of this Agreement, OWNER, on behalf of itself and its successors in interest, hereby expressly agrees and covenants not to sue or otherwise challenge any land use approval affecting the Property and in effect as of the Effective Date. Such agreement and covenant includes, without limitation, the covenant against any direct suit by OWNER or its successor in interest, or any participation, encouragement or involvement whatsoever that is adverse to CITY by OWNER or its successor in interest, other than as part of required response to lawful orders of a court or other body of competent jurisdiction. OWNER hereby expressly waives, on behalf of itself and its successors in interest, any claim or challenge to any land use approval affecting the Property and in effect as of the Effective Date. In the event of any breach of the covenant or waiver contained herein, CITY shall, in addition to any other remedies provided for at law or in equity, be entitled to:
(a) impose and recover (at any time, including after sale to a member of the public or other ultimate user) from the party breaching such covenant or waiver, the full amount of Development Impact Fees that the breaching party would have been required to pay in the absence of this Development Agreement; and (b) impose any subsequently adopted land use regulation on those land use approvals for which the breaching party had not, as of the time of such breach, obtained a building permit.

OWNER hereby acknowledges that it has read and is familiar with the provisions of California Civil Code Section 1542, which is set forth below:

A GENERAL RELEASE DOES NOT EXTEND TO CLAIMS

WHICH THE CREDITOR DOES NOT KNOW OR SUSPECT

TO EXIST IN HIS OR HER FAVOR AT THE TIME OF

EXECUTING THE RELEASE, WHICH IF KNOWN BY HIM

OR HER MUST HAVE MATERIALLY AFFECTED HIS OR
HER SETTLEMENT WITH THE DEBTOR.

Page 349 ends

By initialing below, OWNER hereby waives the provisions of Section 1542 in connection with the matters that are the subject of the foregoing waivers and releases. _______________
Owner’s Initials

8.7 Survival. The provisions of this Section 8 shall survive the termination of this Agreement.

9. MORTGAGEE PROTECTION.

The parties hereto agree that this Agreement shall not prevent or limit OWNER, in any manner, at OWNER’s sole discretion, from encumbering the Property or any portion thereof or any improvement thereon by any mortgage, deed of trust or other security device securing financing with respect to the Property. CITY acknowledges that the lenders providing such financing may require certain Agreement interpretations and modifications and agrees upon request, from time to time, to meet with OWNER and representatives of such lenders to negotiate in good faith any such request for interpretation or modification. CITY will not unreasonably withhold its consent to any such requested interpretation or modification provided such interpretation or modification is consistent with the intent and purposes of this Agreement.

Any Mortgagee of the Property shall be entitled to the following rights and privileges:
(a) Neither entering into this Agreement nor a breach of this Agreement shall defeat, render invalid, diminish or impair the lien of any mortgage on the Property made in good faith and for value, unless otherwise required by law.
(b) The Mortgagee of any mortgage or deed of trust encumbering the Property, or any part thereof, which Mortgagee, has submitted a request in writing to the CITY in the manner specified herein for giving notices, shall be entitled to receive written notification from CITY of any default by OWNER in the performance of OWNER’s obligations under this Agreement.
(c) If CITY timely receives a request from a mortgagee requesting a copy of any notice of default given to OWNER under the terms of this Agreement, CITY shall provide a copy of that notice to the Mortgagee within ten (10) days of sending the notice of default to OWNER. The Mortgagee shall have the right, but not the obligation, to cure the default during the remaining cure period allowed such party under this Agreement. (d) Any Mortgagee who comes into possession of the Property, or any part thereof, pursuant to foreclosure of the mortgage or deed of trust, or deed in lieu of such foreclosure, shall take the Property, or part thereof, subject to the terms of this Agreement.

Notwithstanding any other provision of this Agreement to the contrary, no Mortgagee shall have an obligation or duty under this Agreement to perform any of OWNER’s obligations or other affirmative covenants of OWNER hereunder, or to guarantee such performance; provided,

Page 350 ends

however, that to the extent that any covenant to be performed by OWNER is a condition precedent to the performance of a covenant by CITY, the performance thereof shall continue to be a condition precedent to CITY’s performance hereunder, and further provided that any sale, transfer or assignment by any Mortgagee in possession shall be subject to the provisions of Section 2.4 of this Agreement.

10. MISCELLANEOUS PROVISIONS.

10.1 Recordation of Agreement. This Agreement and any amendment or cancellation thereof shall be recorded with the Yolo County Recorder by the Clerk of the City Council within ten (10) days after the CITY enters into the Agreement, in accordance with Section 65868.5 of the Government Code. If the parties to this Agreement or their successors in interest amend or cancel this Agreement, or if the CITY terminates or modifies this Agreement as provided herein for failure of the OWNER to comply in good faith with the terms and conditions of this Agreement, the City Clerk may have notice of such action recorded with the Yolo County Recorder.

10.2 Entire Agreement. This Agreement sets forth and contains the entire understanding and agreement of the parties, and there are no oral or written representations, understandings or ancillary covenants, undertakings or agreements that are not contained or expressly referred to herein. No testimony or evidence of any such representations, understandings or covenants shall be admissible in any proceeding of any kind or nature to interpret or determine the terms or conditions of this Agreement.

10.3 Severability. If any term, provision, covenant or condition of this Agreement shall be determined invalid, void or unenforceable, the remainder of this Agreement shall not be affected thereby to the extent such remaining provisions are not rendered impractical to perform taking into consideration the purposes of this Agreement. Notwithstanding the foregoing, the provision of the Public Benefits set forth in Section 4 of this Agreement and Exhibit “F”: to this Agreement, including the payment of the Development Impact Fees set forth therein, are essential elements of this Agreement and CITY would not have entered into this Agreement but for such provisions, and therefore in the event such provisions are determined to be invalid, void or unenforceable, this entire Agreement shall be null and void and of no force and effect whatsoever.

10.4 Interpretation and Governing Law. This Agreement and any dispute arising hereunder shall be governed and interpreted in accordance with the laws of the State of California. This Agreement shall be construed as a whole according to its fair language and common meaning to achieve the objectives and purposes of the parties hereto, and the rule of construction to the effect that ambiguities are to be resolved against the drafting party shall not be employed in interpreting this Agreement, all parties having been represented by counsel in the negotiation and preparation hereof.

10.5 Section Headings. All section headings and subheadings are inserted for convenience only and shall not affect any construction or interpretation of this Agreement.

Page 351 ends

10.6 Singular and Plural. As used herein, the singular of any word includes the plural.

10.7 Estoppel Certificate. Any party to this Agreement and any Lender may, at any time, and from time to time, deliver written notice to a party requesting such party to certify in writing that, to the knowledge of the certifying party, (i) the Agreement is in full force and effect and a binding obligation on the parties, (ii) the Agreement has not been amended or modified, either orally or in writing, and if so amended or modified, identifying the amendments or modifications, and (iii) as of the date of the estoppel certificate, the requesting party (or any party specified by a Lender) is not in breach in the performance of its obligations under the Agreement, or if in breach to describe therein the nature of any such breach and the steps or actions to be taken by the other party reasonably necessary to cure any such alleged breach. A party receiving a request hereunder shall execute and return such certificate or give a written detailed response explaining why it will not do so within thirty (30) days following the receipt of such request. Each party acknowledges that such an estoppel certificate may be relied upon by third parties acting in good faith. An estoppel certificate provided by City establishing the status of this Agreement shall be in recordable form and may be recorded at the expense of the recording party.

10.8 Time of Essence. Time is of the essence in the performance of the provisions of this Agreement as to which time is an element.

10.9 Waiver. Failure by a party to insist upon the strict performance of any of the provisions of this Agreement by the other party, or the failure by a party to exercise its rights upon the default of the other party, shall not constitute a waiver of such party’s right to insist and demand strict compliance by the other party with the terms of this Agreement thereafter.

10.10 No Third Party Beneficiaries. This Agreement is made and entered into for the sole protection and benefit of the parties and their successors and assigns. No other person shall have any right of action based upon any provision of this Agreement.

10.11 Force Majeure. Neither party shall be deemed to be in default where failure or delay in performance of any of its obligations under this Agreement is caused by floods, earthquakes, other Acts of God, fires, wars, riots or similar hostilities, strikes and other labor difficulties beyond the party’s control, (including the party’s employment force), government regulations, court actions (such as restraining orders or injunctions), or other causes beyond the party’s control. If any such events shall occur, the Term of this Agreement and the time for performance by either party of any of its obligations hereunder may be extended by the written agreement of the parties for the period of time that such events prevented such performance, provided that the Term of this Agreement shall not be extended under any circumstances for more than five (5) years.

10.12 Mutual Covenants. The covenants contained herein are mutual covenants and also constitute conditions to the concurrent or subsequent performance by the party benefited thereby of the covenants to be performed hereunder by such benefited party.

Page 352 ends

10.13 Successors in Interest. The burdens of this Agreement shall be binding upon, and the benefits of this Agreement shall inure to, all successors in interest to the parties to this Agreement. All provisions of this Agreement shall be enforceable as equitable servitudes and constitute covenants running with the land. Each covenant to do or refrain from doing some act hereunder with regard to development of the Property: (a) is for the benefit of and is a burden upon every portion of the Property; (b) runs with the Property and each portion thereof; and (c) is binding upon each party and each successor in interest (including assignees) during ownership of the Property or any portion thereof.

10.14 Counterparts. This Agreement may be executed by the parties in counterparts, which counterparts shall be construed together and have the same effect as if all of the parties had executed the same instrument.

10.15 Jurisdiction and Venue. Any action at law or in equity arising under this Agreement or brought by a party hereto for the purpose of enforcing, construing or determining the validity of any provision of this Agreement shall be filed and tried in the Superior Court of the County of Yolo, State of California, and the parties hereto waive all provisions of law providing for the filing, removal or change of venue to any other court.

10.16 Project as a Private Undertaking. It is specifically understood and agreed by and between the parties hereto that the development of the Project is a private development, that neither party is acting as the agent of the other in any respect hereunder, and that each party is an independent contracting entity with respect to the terms, covenants and conditions contained in this Agreement. No partnership, joint venture or other association of any kind is formed by this Agreement. The only relationship between CITY and OWNER is that of a government entity regulating the development of private property and the owner of such property.

10.17 Further Actions and Instruments. Each of the parties shall cooperate with and provide reasonable assistance to the other to the extent contemplated hereunder in the performance of all obligations under this Agreement and the satisfaction of the conditions of this Agreement. Upon the request of either party at any time, the other party shall promptly execute, with acknowledgment or affidavit if reasonably required, and file or record such required instruments and writings and take any actions as may be reasonably necessary under the terms of this Agreement to carry out the intent and to fulfill the provisions of this Agreement or to evidence or consummate the transactions contemplated by this Agreement.

10.18 Eminent Domain. No provision of this Agreement shall be construed to limit or restrict the exercise by CITY of its power of eminent domain.

10.19 Agent for Service of Process. In the event OWNER is not a resident of the State of California or it is an association, partnership or joint venture without a member, partner or joint venturer resident of the State of California, or it is a foreign corporation, then in any such event, OWNER shall file with the Community Development Director, upon its execution of this Agreement, a designation of a natural person residing in the State of California, giving his or her name, residence and business addresses, as its agent for the purpose of service of process in any court action arising out of or based upon this Agreement, and the delivery to such agent of a

Page 353 ends

copy of any process in any such action shall constitute valid service upon OWNER. If for any reason service of such process upon such agent is not feasible, then in such event OWNER may be personally served with such process out of this County and such service shall constitute valid service upon OWNER. OWNER is amenable to the process so served, submits to the jurisdiction of the Court so obtained and waives any and all objections and protests thereto.

10.20 Authority to Execute. The person or persons executing this Agreement on behalf of OWNER warrants and represents that he or she/they have the authority to execute this Agreement on behalf of his or her/their corporation, partnership or business entity and warrants and represents that he or she/they has/have the authority to bind OWNER to the performance of its obligations hereunder.

10.21 Obligations Joint and Several. The obligations of OWNER under this Agreement shall be joint and several with respect to the entities which, collectively, comprise OWNER.

Further, the obligations of OWNER under this Agreement shall apply with respect to the entire Property, as it may be subdivided, sold, transferred, or otherwise conveyed, and run with the land.

Page 354 ends

IN WITNESS WHEREOF, the parties hereto have executed this Development Agreement on the last day and year set forth below.

OWNER

THE NEW HOME COMPANY
NORTHERN CALIFORNIA LLC, a
Delaware Limited Liability Company
By: ________________________________
Its: ________________________________
Dated: _______________
CITY
CITY OF WOODLAND, a California
municipal corporation
By:_________________________________
Ken Hiatt
City Manager
Dated: _______________
ATTEST:

By:_________________________________
Ana Gonzalez
City Clerk
APPROVED AS TO LEGAL FORM:

BEST BEST & KRIEGER LLP
____________________________________
City Attorney

Page 355 ends

STATE OF CALIFORNIA )
) ss.

COUNTY OF YOLO )
On ____________________, before me, _________________________, personally appeared _______________________________________________
___________________________________________________________________ personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument.

Witness my hand and official seal.
____________________________________
Notary Public
[SEAL]

STATE OF CALIFORNIA )
) ss.

COUNTY OF YOLO )
On ____________________, before me, _________________________, personally appeared _______________________________________________
___________________________________________________________________ personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of which the person(s) acted, executed the instrument.

Witness my hand and official seal.
____________________________________
Notary Public
[SEAL]

Page 356 ends

EXHIBIT “A”

Page 357 ends

EXHIBIT “B”
Map of the Property
Ruby Estates 3: (APN:042-030-054)
[PLACEHOLDER]

Page 358 ends

EXHIBIT “C”
Development Plans
Ruby Estates Tentative Subdivision Map #5221
[PLACEHOLDER]

Page 359 ends

Ruby Estates Development Plan –August 11, 2022
[PLACEHOLDER]

Page 360 ends

Ruby Estates Preliminary Landscape Plan
[PLACEHOLDER]

Page 361 ends

EXHIBIT “D”
PD Overlay Standards
Ruby Estates PD Overlay Development Standards
Lot Size
Area 1,900 – 3,000 sq/ft (2,367sq/ft average)
Width 20-52 ft (37ft average)
Permitted Density
Maximum Density per lot 1 dwelling
Setbacks
Front (Paseo) 4ft
Front (Public Road) 10ft
Side 3.5ft
Rear 4ft from alley 10ft from site perimeter
Coverage
Maximum Lot Coverage 67% (40-67%)
Height
Maximum Height 23ft
Parking
Minimum Parking 2 per dwelling
Supplemental Design Standards
Front Yard Stagger Non required
Mix of Two-story units No limit
Second Story Separation A minimum of 7 feet shall be provided between second story elements of adjacent
two-story dwellings
Architectural Design Architectural treatment shall be applied to all elevations of buildings as identified in the
Design Review booklet.

Notes:
(1) Steps may encroach into the setback
(2) Second Story Elements such as but not limited to eaves and cornices may encroach up to 1ft into a required setback provided adequate access/emergency egress paths are maintained.

Page 362 ends

EXHIBIT “E”

RUBY ESTATES DEVELOPMENT AGREEMENT

PROJECT CONDITIONS OF APPROVAL
[PLACEHOLDER]

Page 363 ends

EXHIBIT “F”
(Ruby Estates Project Fees)
CITY may in its sole discretion, collect any of the following fees either prior to the issuance of a building permit for the Project or concurrently with the approval of a final subdivision map for the Property. The fees set forth herein do not include fees imposed by other agencies, such as the County of Yolo or Woodland Joint Unified School District. This project is considered multifamily for purpose of calculating Spring Lake fees and single family for the purpose of calculating citywide Development Impact Fees.

Development Impact Fees for the following categories and amounts are shown as of January 1, 2022 but actual fee amounts owed by OWNER will be the then-current amounts of such fees at the time they are paid by OWNER. All fees are subject to annual CCI.

Development Impact Fee SL SFD
(Single Family Dwelling)
General City 952
Fire 3,225
Library 595
Police 779
Wastewater 7,125
Water 5,727
Parks & Recreational Facilities 4,834
Roads 9,389
MPFP Admin Fee (.75%) 245
Storm Drainage Facilities Included in SLIF
Subtotal 32,871
The other fees include all applicable fees identified in this Agreement or conditions of approval which are linked to final map approval or issuance of a building permit. These fees include, but are not limited to, the following (Fees are due at final map and subject to annual CCI):
 SLIF fees MF $35,641 for the fair share of backbone infrastructure to the Spring Lake Specific Plan area;
 Spring Lake Fire Department Operation and Maintenance Funding Fee of $771 SFU/$540 for MFU
 Public transit capital fee of $247 for the construction of transit capital improvements  Public transit operations fee of $51 for MFU
 Fiscal Deficit mitigation fees of $1050 for MFU
 The Project’s prorated share of the Habitat Monitoring and Farming Education Fees $63 SFU/$45 MFU

Page 364 ends

 Offsite Affordable fee – no charge as a MF project
General purpose fee (see Development Agreement Section 4.9) of $5,000 per building permit, for 87 units, for a total obligation of $435,000 payable in one lump sum amount that will be due and payable in one lump sum amount at final map.

Affordable housing in-lieu fee (see Development Agreement Section 4.8) of $3,900 per unit, for 87 units, for a total obligation of $339,300 at time of building permit.

At the time of this document approval the property currently holds SLIF credit balance of $545,195

Page 365 ends

MIEKLE AVENUE COUNTY ROAD 25A GIDDINGS COURT CHAMBERLAIN COURT CHRISTIANSEN CIRCLE 75 74 73 72 76 77 79 78
110
71 125 126
141 HERITAGE REMAINDER AREA - PHASE 1 2015 MB 45
HERITAGE REMAINDER AREA - PHASE 2
2017 MB 82 300' LIMIT LINE CONTEXTUAL MAP RUBY ESTATES Sacramento Office 103/04/2022 JOB NO: OF SHEET DATE: CCLESG SCALE CHECKED BY: DRAWN BY: DESIGNED BY: 1" = 200' 1 CITY OF WOODLAND CALIFORNIA 1863.10.03 Project Planning Civil Engineering Landscape Architecture 2940 Spafford Stret, Suite 20 Davis, CA 95618 (530) 758-2026 2120 20th Street, Suite Three Sacramento, CA 95818 (916) 455-2026 CECWEST.COM Davis Office ZONING BOUNDARIES SUBJECT PROPERTY LEGEND: LOW DENSITY RESIDENTIAL MEDIUM DENSITY RESIDENTIAL PUBLIC/QUASI PUBLIC ZONE: R-15 (EXISTING) R-15 WITH P/D OVERLAY (PROPOSED) SPRING LAKE SP (PROPOSED RUBY ESTATES SUBDIVISION) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 1) ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 2) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 2) ZONE: A-N YOLO COUNTY BANKS DRIVE MURPHY DRIVE ZONE: P-QP SPRING LAKE SP WOODLAND JOINT UNIFIED SCHOOL DISTRICT ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 1) GENERAL PLAN LAND USE DESIGNATIONS OPEN SPACE

Page 366 ends

PROJECT INFORMATION SUMMARY SHEET
Spring Lake Specific Plan, Ruby Estates (PLNG 22 -00007) – Request to approve a Tentative Subdivision Maps (TSM #5221) a Zoning Amendment to allow Planned Development Overlay, a Conditional Use Permit, Site Plan and Design Review, and a Development Agreement for a parcel of land located within the Spring Lake Specific Plan Area to allow development of 87 singlefamily lots, consistent with the Medium Density General Plan land use designation and multifamily R-15 specific plan designation for the property. APN: 042-030-054 Location: The subject parcel (APN 042-030-054, 7.03 acres) is located at the northwest corner of Miekle Avenue and County Road 25A. The subject properties are located within the original Heritage Remainder Tentative Subdivision Map 5048 approved on June 13, 2014.

Applicant/Owner:

Applicant: The New Home Company 1508 Eureka Road, Suite 290, Roseville CA, 95661 Owner: Ruby Realty Investors, LLC, 1480 Moraga Road Suite C103, Moraga CA, 94556 Environmental Review: The project is consistent with the Environmental Impact Report (SCH #99022069, Turn of the Century EIR) on the Spring Lake Specific Plan certified on August 15, 2000 and with prior addenda to the Turn of the Century EIR. The proposed project, which result in a fewer number of residential units than originally contemplated, will result in environmental impacts that are similar to those identified in the previous EIR. Infrastructure improvements beyond those previously anticipated will not be required. The proposed project will result in a similar number of residential units, as contemplated in the original EIR, and will result in environmental impacts similar to those identified in the previous EIR.

APN: APN 042-030-054, 7.03 acres
Project Planner: Megan Meier, Associate Planner
Staff Recommendation: City Council Approval with Conditions Report For: City Council Public Hearing, July 5, 2022
General Plan Designation: Medium Density (8.1 – 19.9 DU/Gross Acre) Current Zoning: Multi- Family/R-15 (10-15 DU/Acre)
Specific Plan Designation: Spring Lake Specific Plan
Existing Land Uses: Vacant/ Existing curb, gutter, sidewalk, and street lights.

Page 367 ends

Flood Zone: Flood Zone X – Area Outside the 2% Annual Chance Flood Event, FIRM Community Panel Number – 060426-0445H Revised May 16, 2002 Street Access: Miekle Avenue via County Road 25A
Adjacent Land Uses & Zoning:

Direction Land Use Zoning
North Existing Single Family Homes R-4
South County Road 25 A &
Agriculture
County
East Existing Single Family Homes R-4
West Existing Single Family Homes R-4
Applicable Laws, Codes & Ordinances:

This project is subject to several laws, codes and ordinances:
 The City of Woodland General Plan
 The City of Woodland Zoning Ordinance
 California Environmental Quality Act (CEQA)
 Spring Lake Specific Plan (SLSP)
 SLSP Mitigation Monitoring Plan (MMP)
 SLSP Affordable Housing Plan

Page 368 ends

December 16, 2021
Mr. Justin Walters
Vice President, Project Management and Development
The New Home Company
1508 Eureka Road, Suite 290
Roseville, California 95661
Geotechnical Engineering Report Update
RUBY ESTATES (HERITAGE PARCEL 4)
Sheldon Road and Power Inn Road
Elk Grove, California
WKA No. 4630.2113421.0100

INTRODUCTION
As authorized, we have prepared this report update for the undeveloped property designated as Parcel 4 within the Heritage residential development in Woodland, California. Wallace-Kuhl & Associates (WKA), Inc. previously prepared a Geotechnical Engineering Report (WKA, Inc. No. 4159.09, dated June 15, 2004) for the Heritage residential development, which included the referenced village. Following completion of the Geotechnical Engineering Report, WKA prepared a Geotechnical Engineering Report Update (WKA No. 9523.06, dated January 16, 2014). Since completion of the 2014 Geotechnical Engineering Report Update, the following geotechnical reports have been prepared for the site by others:  Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 prepared for the project by Geocon Consultants, Inc. (Geocon) dated August 27, 2021 (Geocon Project No. S2028-05-01).  Preliminary Geotechnical Feasibility Assessment – Proposed Residential Development – Ruby Estates prepared by Quantum Geotechnical, Inc. (Quantum) dated September 23, 2021 (Quantum Project No. H055.G).

The purpose of this update has been to evaluate the applicability of the referenced reports prepared for the planned construction at the referenced village (Parcel 4) and to update the reports to reflect changes in the applicable building code and in the practice of geotechnical engineering since the original report was issued.

Page 369 ends

Geotechnical Engineering Report Update Page 2

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Our scope of services has included:  a site reconnaissance;  review of the referenced WKA, Inc, WKA, Geocon, and Quantum geotechnical reports;  engineering analyses; and,  preparation of this report update. Project Background and Proposed Improvements Since the 2004 Geotechnical Engineering Report was completed, residential construction associated with the Heritage development was performed in the vicinity of Parcel 4; however, Parcel 4 has remained vacant. Based on our experience in the area and review of historical photographs, the site has been used as a fill source and to stockpile excess material from surrounding developments since at least August of 2006 until at least February of 2018. Review of the 2021 Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 report indicates the upper two to four feet of soil across the site consists of undocumented fill.

We understand development of the site will consist of residential construction with one- or two- story, wood-framed, single-family structures with an interior slab-on-grade lower floor (posttensioned foundation system). Below-grade basements for the residential structures are not planned. Structural loads for the residential structures are anticipated to be relatively light based on this type of construction.

Associated development will include construction of asphalt concrete roadways, concrete sidewalks, residential landscaping, underground utilities, exterior flatwork and driveway slabs.

The planned development is consistent with previous developments in the vicinity of the site and as noted in the referenced geotechnical reports.

Site Description
In December of 2021, an engineer from our firm visited the subject site. At the time of our site visit, the site was vacant and covered with a sparse growth of volunteer grass and weeds.

Standing water was observed throughout the site.

The site is bound to the north and east by residential development, to the south by vacant property and to the west by a drainage ditch, beyond which is residential development. The drainage ditch appears to be about two to four feet lower in elevation than the surrounding ground surface.

Page 370 ends

Geotechnical Engineering Report Update Page 3

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021

CONCLUSIONS AND RECOMMENDATIONS
Based on review of the referenced geotechnical reports for the Heritage residential development, our recent observations, and understanding of the planned construction, we conclude that the recommendations contained in the 2004 Geotechnical Engineering Report and 2014 Geotechnical Engineering Report Update remain generally applicable for design and construction of the planned residential structures and associated improvements, with the following amended conclusions and recommendations. The 2014 Geotechnical Engineering Report Update, which includes the 2004 Geotechnical Engineering Report, and 2021 Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 are attached to this update. 2019 California Building Code Seismic Design Parameters The 2019 California Building Code (CBC) references the American Society of Civil Engineers (ASCE), Minimum Design Loads and Associated Criteria for Buildings and Other Structures 7- 16. To assist with the structural design of the project, we have provided seismic design parameters for the 2019 CBC which have been determined based on the site location and the web interface developed by the Structural Engineers Association of California (SEAOC) and the Office of Statewide Health Planning and Development (OSHPD) (https://seismicmaps.org).

Since S1 is greater than 0.2g, the 2019 CBC coefficient values Fv, SM1, and SD1 presented are valid for seismic design, provided the requirements in Exception Note 2 in Section 11.4.8 of ASCE 7-16 apply, specifically if T≤ 1.5TS. In our experience, the planned residential buildings will meet Exception Note 2 of ASCE 7-16. However, the project structural engineer should verify the exception is met.

TABLE 1: 2019 CBC/ASCE 7-16 SEISMIC DESIGN PARAMETERS
Latitude: 38.6416° N
Longitude: 121.7374° W
ASCE 7-16
Table/Figure
2019 CBC
Figure/Section/Table
Factor/
Coefficient
2019 CBC
Values

0.2-second Period MCER Figure 22-1 Figure 1613.2.1(1) SS 0.891 g

1.0 second Period MCER Figure 22-2 Figure 1613.2.1(2) S1 0.328 g Soil Class Table 20.3-1 Section 1613.2.2 Site Class D
Site Coefficient Table 11.4-1 Table 1613.2.3(1) Fa 1.144 Site Coefficient Table 11.4-2 Table 1613.2.3(2) Fv 1.972* Adjusted MCE Spectral Response Parameters
Equation 11.4-1 Equation 16-36 SMS 1.019 g
Equation 11.4-2 Equation 16-37 SM1 0.647 g*

Page 371 ends

Geotechnical Engineering Report Update Page 4

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Latitude: 38.6416° N
Longitude: 121.7374° W
ASCE 7-16
Table/Figure
2019 CBC
Figure/Section/Table
Factor/
Coefficient
2019 CBC
Values
Design Spectral
Acceleration Parameters
Equation 11.4-3 Equation 16-38 SDS 0.679 g
Equation 11.4-4 Equation 16-39 SD1 0.431 g* Seismic Design Category Table 11.6-1 Table 1613.2.5(1) Risk Category
I to IV D
Table 11.6-2 Table 1613.2.5(2) Risk Category
I to IV D
Notes: MCER = Risk-Targeted Maximum Considered Earthquake; g = gravity * = The value is valid provided the requirements in Exception Note No. 2 in Section 11.4.8 of ASCE 7-16 are met.

Based on the soil, groundwater, and geology conditions of the site, liquefaction is not anticipated to affect the proposed improvements and does not need to be accounted for in design.

Site Clearing and Subgrade Preparation
As noted previously, about two to four feet of undocumented fill has been placed across the site.

The undocumented fill is not considered suitable for support of the proposed improvements in its current condition. Therefore, the undocumented fill will need to be removed and replaced as engineered fill in accordance with the recommendations of this report.

Existing surface organics within construction areas should be stripped from the site. Strippings maybe stockpiled for later use or disposed of offsite. Debris from the stripping should not be used in general fill construction areas supporting structures or pavements. With the prior approval of the Geotechnical Engineer, strippings may be used in landscape areas, provided they are kept at least five feet from the building pad and other surface improvements, moisture conditioned, and compacted. Discing of the organics into the surface soils may be a suitable alternate to stripping, depending on the condition and quantity of the organics at the time of grading. The decision to utilize discing in lieu of stripping should be made by the Geotechnical Engineer, or his representative, at the time of earthwork construction. Discing operations, if approved, should be observed by the Geotechnical Engineer, or his representative, and be continuous until the organics are adequately mixed into the surface soils to provide a compactable mixture of soil containing minor amounts of organic matter. Pockets or concentrations of organics will not be allowed.

Following site clearing activities, the site should be over-excavated to a depth of at least three feet below existing grades. the exposed subgrade following removal of the upper three feet should be evaluated by our representative to determine if additional over-excavation is required.

The over-excavation should extend at least five feet beyond the edge of proposed improvements, where possible. Any debris exposed by the required over-excavation should be

Page 372 ends

Geotechnical Engineering Report Update Page 5

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
removed and the resulting excavations should be restored to grade with engineered fill placed and compacted in accordance with the recommendations in this report. The lateral extents of the required over-excavation should be clearly marked on the final grading plans. We recommend construction bid documents contain a unit price (price per cubic yard) for additional excavation due to deeper undocumented fill and/or the presence of unsuitable materials and replacement with engineered fill.

The Geotechnical Engineer should be given the opportunity to review the final grading plan to determine if the intent of the over-excavation recommendation has been properly implemented.

Following over-excavation operations, the upper 12 inches of the exposed subgrade should be scarified, moisture conditioned to at least the optimum moisture content, and compacted to at least 90 percent of the American Society of Testing and Materials (ASTM) D1557 maximum dry density.

The resulting over-excavation should be restored with engineered fill placed and compacted in accordance with Engineered Fill Construction section of this report.

Compaction of all subgrade soils should be performed using a heavy, self-propelled, sheepsfoot compactor capable of achieving the required compaction and must be performed in the presence of the Geotechnical Engineer’s representative who will evaluate the performance of subgrade under compactive load. Difficulty in achieving subgrade compaction may be an indication of loose, soft or unstable soil conditions that could require additional excavation. If these conditions exist, additional subgrade stabilization recommendations may be required at the time of construction.

Engineered Fill Construction
Engineered fill consisting of on-site or import materials should be placed in lifts not exceeding six inches in compacted thickness, with each lift being thoroughly moisture conditioned to at least two percent above the optimum moisture content, maintained in that condition, and uniformly compacted to at least 90 percent relative compaction based on the maximum dry density per ASTM D1557. From a geotechnical standpoint, the on-site soils encountered at the site are considered suitable for use as engineered fill provided that they do not contain significant quantities of organics, rubble and deleterious debris, are at a proper moisture content to achieve the desired degree of compaction.

Imported fill materials, if required, should be compactable, well-graded, granular soils with an Expansion Index of 20 or less when tested in accordance with ASTM D4829, and should not contain particles greater than three inches in maximum dimension.

Page 373 ends

Geotechnical Engineering Report Update Page 6

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
In addition, with the exception of imported aggregate base and bedding/initial fill materials for underground utilities, we recommend that the contractor provide appropriate documentation for all imported fill materials that designates the import materials do not contain known contaminants per Department of Toxic Substances Control’s guidelines for clean fill, and have corrosion characteristics within acceptable limits. Imported soils should be approved by the Geotechnical Engineer prior to being transported to the site. The upper six inches of the final pavement subgrade should be uniformly compacted to at least 95 percent of the ASTM D1557 maximum dry density at a moisture content of at least the optimum moisture and must be stable under construction traffic prior to placement of aggregate base, after construction of underground utilities is complete. The proof-roll should be observed by a representative of the Geotechnical Engineer.

Subgrades for support of all concrete slabs-on-grade and pavements should be protected from disturbance or desiccation until covered by capillary break material or aggregate base.

Disturbed subgrade soils may require additional processing and recompaction, depending on the level of disturbance.

Permanent excavation and fill slopes, if any, should be constructed no steeper than two horizontal to one vertical (2H:1V) and should be vegetated as soon as practical following grading to minimize erosion. As a minimum, the following erosion control measures should be considered: placement of straw bale sediment barriers or construction of silt filter fences in areas where surface run-off may be concentrated.

All earthwork operations should be accomplished in accordance with the recommendations contained within this report and the approved plans and specifications. We recommend the Geotechnical Engineer’s representative be present on a regular basis during all earthwork operations to observe and test the engineered fill and to verify compliance with the recommendations of this report and the project plans and specifications.

From a geotechnical standpoint, the on-site soils encountered at the site are considered suitable for use as engineered fill provided that they do not contain significant quantities of organics, rubble and deleterious debris, and are at a proper moisture content to achieve the desired degree of compaction.

Page 374 ends

Geotechnical Engineering Report Update Page 7

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Drought Considerations
The soils at the site are considered expansive. These soils swell when the moisture content increases and shrink when the soil moisture content decreases. It will be essential that the soil moisture content under and near foundations and exterior concrete flatwork remain relatively constant to mitigate the potential for heaving or settling of the foundation and slabs.

The State of California can experience significant periods of severe drought conditions. If this occurs, the ability for homeowners to use irrigation as a means for maintaining landscape vegetation and soil moisture could be inhibited for unpredictable periods of time. For this reason, landscape and hardscape systems for this development should be carefully planned to prevent the desiccation of soils under and near foundations and slabs. Trees with invasive shallow root systems should be avoided. No trees or large shrubs that could remove soil moisture during dry periods should be planted within five feet of any foundation or slab. Fallow ground adjacent to foundations must be avoided.

To reduce potential for soil creep adversely affecting residential foundations or exterior flatwork, we recommend a minimum horizontal distance of five feet be provided and maintained between the outside edge of the foundation or flatwork to the nearest adjacent slope (e.g. building pad hinge point), for slopes greater than two feet in height.

Construction Testing and Observation
Site clearing and preparation for the site should be accomplished in accordance with the recommendations included in this update report and the referenced geotechnical reports, where applicable. The Geotechnical Engineer’s representative should be present during site preparation and all lot grading operations to observe and test the fill to verify compliance with our recommendations and the job specifications. We also recommend that our firm be retained to review final plans and specifications to determine if the intent of our recommendations has been implemented into those documents. Wallace-Kuhl & Associates has been contracted to provide foundation plan review services for the subject lots.

LIMITATIONS
This letter is considered to be an update to the referenced geotechnical reports prepared for the Heritage development, which included the subject site, and therefore the conclusions and recommendations contained herein are subject to the limitations stated in that report.

Page 375 ends

Geotechnical Engineering Report Update Page 8

RUBY ESTATES
WKA No. 4630.2113421.0100
December 16, 2021
Thank you for this opportunity to be of service. If you have any questions regarding this update or the previous geotechnical engineering report, please contact our office.

Wallace-Kuhl & Associates
Matthew S. Moyneur
Senior Engineer
Attachments: Geotechnical Engineering Report Update, Heritage Development Villages 1 through 5 (WKA No. 9523.06, dated January 16, 2014)
Limited Geotechnical Evaluation of Existing Fill – Heritage Development – Parcel 4 (Geocon Project No. S2028-05-01; dated August 27, 2021)

Page 376 ends
Page 377 ends
Page 378 ends
Page 379 ends
Page 380 ends
Page 381 ends
Page 382 ends
Page 383 ends
Page 384 ends
Page 385 ends
Page 386 ends
Page 387 ends
Page 388 ends
Page 389 ends
Page 390 ends
Page 391 ends
Page 392 ends
Page 393 ends
Page 394 ends
Page 395 ends
Page 396 ends
Page 397 ends
Page 398 ends
Page 399 ends
Page 400 ends
Page 401 ends
Page 402 ends
Page 403 ends
Page 404 ends
Page 405 ends
Page 406 ends
Page 407 ends
Page 408 ends
Page 409 ends
Page 410 ends
Page 411 ends
Page 412 ends
Page 413 ends
Page 414 ends
Page 415 ends
Page 416 ends
Page 417 ends
Page 418 ends
Page 419 ends
Page 420 ends
Page 421 ends
Page 422 ends
Page 423 ends
Page 424 ends
Page 425 ends
Page 426 ends
Page 427 ends
Page 428 ends
Page 429 ends
Page 430 ends
Page 431 ends
Page 432 ends
Page 433 ends
Page 434 ends
Page 435 ends
Page 436 ends
Page 437 ends
Page 438 ends
Page 439 ends
Page 440 ends
Page 441 ends
Page 442 ends
Page 443 ends
Page 444 ends
Page 445 ends
Page 446 ends
Page 447 ends
Page 448 ends
Page 449 ends
Page 450 ends
Page 451 ends
Page 452 ends
Page 453 ends
Page 454 ends
Page 455 ends
Page 456 ends
Page 457 ends
Page 458 ends
Page 459 ends
Page 460 ends

Project No. S2028-05-01
August 27, 2021

VIA ELECTRONIC MAIL
Glenn Matsuhara
Matsuhara Associates, LLC
[email protected]
Subject: LIMITED GEOTECHNICAL EVALUATION OF EXISTING FILL HERITAGE DEVELOPMENT – PARCEL 4
COUNTY ROAD 25A AND MIEKLE AVENUE

WOODLAND, CALIFORNIA
Mr. Matsuhara:

In accordance with your authorization, we have performed a limited geotechnical evaluation for the approximately seven-acre parcel identified as Parcel 4 located on the northwest corner of County Road 25A and Miekle Avenue in Woodland, California.

PROJECT DESCRIPTION AND BACKGROUND
The site consists of Parcel 4 within the Heritage residential development in the southern portion of the City of Woodland. The site area is approximately seven acres and is located on the west side of Mielke Avenue and north of (future) County Road 25A. The site is currently undeveloped and is vegetated with grasses and some mature trees. The site has historically been used for agricultural (row crop) production and has most recently been used for storage of soil stockpiles from nearby development projects. Most of the stockpiles have been removed, however, some still remain.

Wallace-Kuhl & Associates (WKA) prepared a geotechnical engineering report update Villages 1 through 5 of the overall Heritage development, of which the Parcel 4 site is a part. (WKA, 2014). The WKA study included subsurface explorations on and near the Parcel 4 site and indicate the presence of stockpiled soil in various locations throughout the development, including the Parcel 4 site. The WKA report indicated that the site is underlain by alluvial soil generally consisting of interbedded layers of clay and sand, which is consistent with our experience in the area.

We understand that you are considering developing the site with two-story detached residential buildings and private interior streets. However, before proceeding with design and development, you have requested a preliminary evaluation of the character and extent of stockpiles/fill on the site.

SCOPE OF SERVICES
As requested, we performed the following scope of services:
• Performed a site reconnaissance to determine access and mark out the proposed exploration locations. • Notified subscribing utility companies via Underground Service Alert (USA) a minimum of two business days (as required by law) prior to performing exploratory excavations at the site. • Performed 11 test pits (TP1 through TP11) throughout the site using a mini excavator. • Photographed and logged the conditions encountered in the test pits. • Prepared this letter describing the nature and extent of the fill at the site.

Page 461 ends

Geocon Project No. S2028-05-01 -2- August 27, 2021

OBSERVATIONS AND DISCUSSION
On September 23, 2020, we performed a site reconnaissance and observed the excavation of 11 test pits throughout the site using a mini-excavator. On this date, the site was covered with a moderate growth of dry, annual grasses. The test pits ranged in depth from approximately 3 to 5 feet and penetrated the fill to expose native alluvial soil as described in the WKA geotechnical reports. The approximate test pit locations and depth of fill at each test pit are shown below:

The fill generally consisted of sandy lean clay, which is similar to the alluvial soil. The consistency of the fill was variable, and it appears that the fill did not receive specific compaction effort. We did not observe significant concentrations of organics, rock, or deleterious materials within the fill.

CONCLUSIONS
Based on our observations, the site is blanked by approximately 2 to 4 feet of undocumented fill generally consisting of sandy lean clay, which is similar to the native alluvial soil at the site. The fill is likely suitable for re-use on the site; however, remedial grading in the form of removal and recompaction would be require as part of site grading. Screening and removal of minor amounts of deleterious material should also be expected. Specific recommendations for site grading and subsequent development should be provided in a future geotechnical update study specific for this site.

Page 462 ends

Geocon Project No. S2028-05-01 -3- August 27, 2021

LIMITATIONS
Our services were limited to evaluate the character and extent of existing fill on the site. A site-specific geotechnical update study will be required for site design and development. Our services were performed in accordance with engineering principles and practices generally accepted at this time and location. We make no warranty, express or implied.

Please contact us if you have any questions regarding this letter or if we may be of further service.

Respectfully Submitted,
GEOCON CONSULTANTS, INC.

Jeremy J. Zorne, PE, GE
Senior Engineer

Page 463 ends
Page 464 ends

LOT LOT LOT LOT
DEPTH1 WIDTH2 AREA COVERAGE FRONT REAR INT. SIDE ST. SIDE (FT) (FT) (FT2
) % (FT2) % LOT (FT) (FT) (FT) (FT)
1 67 32 2,941 42% 1698 58% Single Family 4 4 3.5 3.5
2 67 34 2,239 52% 1081 48% Single Family 4 4 3.5 3.5
3 67 42 2,958 42% 1715 58% Single Family 4 4 3.5 3.5
4 58 29 2,405 48% 1247 52% Single Family 4 4 3.5 3.5
5 58 36 2,088 60% 844 40% Single Family 4 4 3.5 3.5
6 58 43 2,581 48% 1338 52% Single Family 4 4 3.5 3.5
7 58 42 2,538 49% 1295 51% Single Family 4 4 3.5 3.5
8 58 33 1,943 60% 785 40% Single Family 4 4 3.5 3.5
9 58 43 2,593 48% 1350 52% Single Family 4 4 3.5 3.5
10 58 39 2,424 48% 1266 52% Single Family 4 4 3.5 3.5
11 58 36 2,098 59% 854 41% Single Family 4 4 3.5 3.5
12 58 43 2,585 48% 1341 52% Single Family 4 4 3.5 3.5
13 59 42 2,570 48% 1327 52% Single Family 4 4 3.5 3.5
14 59 34 1,974 59% 816 41% Single Family 4 4 3.5 3.5
15 59 43 2,642 47% 1398 53% Single Family 4 4 3.5 3.5
16 60 39 2,448 47% 1290 53% Single Family 4 4 3.5 3.5
17 59 36 2,142 58% 898 42% Single Family 4 4 3.5 3.5
18 59 43 2,665 47% 1421 53% Single Family 4 4 3.5 3.5
19 60 41 2,587 48% 1344 52% Single Family 4 4 3.5 3.5
20 60 34 2,003 58% 845 42% Single Family 4 4 3.5 3.5
21 60 43 2,701 46% 1458 54% Single Family 4 4 3.5 3.5
22 63 43 2,769 45% 1526 55% Single Family 4 4 3.5 3.5
23 63 34 2,094 55% 936 45% Single Family 4 4 3.5 3.5
24 63 41 2,531 59% 1039 41% Single Family 4 4 3.5 3.5
25 63 33 2,094 55% 936 45% Single Family 4 4 3.5 3.5
26 63 36 2,250 51% 1092 49% Single Family 4 4 3.5 3.5
27 63 41 2,563 58% 1070 42% Single Family 4 4 3.5 3.5
28 63 34 2,094 55% 936 45% Single Family 4 4 3.5 3.5
29 63 38 2,406 62% 913 38% Single Family 4 4 3.5 3.5
30 58 34 1,963 59% 805 41% Single Family 4 4 3.5 3.5
31 58 36 2,104 59% 861 41% Single Family 4 4 3.5 3.5
32 58 33 1,958 59% 800 41% Single Family 4 4 3.5 3.5
33 58 36 2,104 59% 861 41% Single Family 4 4 3.5 3.5
34 58 20 2,376 49% 1218 51% Single Family 4 4 3.5 3.5
35 60 52 3,073 49% 1580 51% Single Family 4 4 3.5 3.5
36 60 36 2,142 58% 899 42% Single Family 4 4 3.5 3.5
37 60 39 2,291 65% 798 35% Single Family 4 4 3.5 3.5
38 60 42 2,784 54% 1292 46% Single Family 4 4 3.5 3.5
39 58 39 2,268 55% 1024 45% Single Family 4 4 3.5 3.5
40 58 34 1,958 59% 799 41% Single Family 4 4 3.5 3.5
41 58 34 1,958 59% 799 41% Single Family 4 4 3.5 3.5
42 58 38 2,250 66% 757 34% Single Family 4 4 3.5 3.5
43 58 37 2,408 52% 1165 48% Single Family 4 4 3.5 3.5
44 58 36 2,109 55% 951 45% Single Family 4 4 3.5 3.5
45 58 39 2,250 66% 757 34% Single Family 4 4 3.5 3.5
46 58 39 2,250 66% 757 34% Single Family 4 4 3.5 3.5
47 58 36 2,104 59% 860 41% Single Family 4 4 3.5 3.5
48 58 41 2,503 60% 1011 40% Single Family 4 4 3.5 3.5
49 58 41 2,370 52% 1127 48% Single Family 4 4 3.5 3.5
50 58 36 2,088 60% 844 40% Single Family 4 4 3.5 3.5
51 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
52 58 36 2,088 60% 844 40% Single Family 4 4 3.5 3.5
53 58 43 2,505 60% 1012 40% Single Family 4 4 3.5 3.5
54 58 38 2,213 52% 1055 48% Single Family 4 4 3.5 3.5
55 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
56 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
57 58 39 2,233 67% 740 33% Single Family 4 4 3.5 3.5
58 58 40 2,335 53% 1092 47% Single Family 4 4 3.5 3.5
59 66 45 2,996 50% 1503 50% Single Family 4 4 3.5 3.5
60 66 36 2,387 52% 1144 48% Single Family 4 4 3.5 3.5
61 66 36 2,383 52% 1139 48% Single Family 4 4 3.5 3.5
62 66 34 2,214 52% 1055 48% Single Family 4 4 3.5 3.5
63 66 42 2,790 54% 1297 46% Single Family 4 4 3.5 3.5
64 63 36 2,250 51% 1092 49% Single Family 4 4 3.5 3.5
65 63 39 2,406 62% 913 38% Single Family 4 4 3.5 3.5
66 63 36 2,401 48% 1243 52% Single Family 4 4 3.5 3.5
67 59 38 2,705 55% 1213 45% Single Family 4 4 3.5 3.5
68 59 39 2,136 58% 892 42% Single Family 4 4 3.5 3.5
69 59 34 2,703 55% 1210 45% Single Family 4 4 3.5 3.5
70 60 32 2,867 52% 1375 48% Single Family 4 4 3.5 3.5
71 60 36 2,171 57% 927 43% Single Family 4 4 3.5 3.5
72 60 39 2,774 54% 1281 46% Single Family 4 4 3.5 3.5
73 58 37 2,749 54% 1256 46% Single Family 4 4 3.5 3.5
74 58 36 2,097 59% 854 41% Single Family 4 4 3.5 3.5
75 58 39 2,691 55% 1199 45% Single Family 4 4 3.5 3.5
BLDG SETBACKS (MIN.)

RUBY ESTATES TENTATIVE MAP

LOT MATRIX
LOT #

TYPE PRIVATE OPEN

SPACE / YARD AREA
S:\Projects\1800\1863 Ruby Estates\Calculations\1863 LOT MATRIX 1

Page 465 ends

LOT LOT LOT LOT
DEPTH1 WIDTH2 AREA COVERAGE FRONT REAR INT. SIDE ST. SIDE (FT) (FT) (FT2
) % (FT2) % LOT (FT) (FT) (FT) (FT)
BLDG SETBACKS (MIN.)

RUBY ESTATES TENTATIVE MAP

LOT MATRIX
LOT #

TYPE PRIVATE OPEN

SPACE / YARD AREA
76 59 29 2,461 47% 1303 53% Single Family 4 4 3.5 3.5
77 59 39 2,257 66% 764 34% Single Family 4 4 3.5 3.5
78 59 44 2,808 53% 1316 47% Single Family 4 4 3.5 3.5
79 58 29 2,384 49% 1226 51% Single Family 4 4 3.5 3.5
80 58 36 2,088 60% 845 40% Single Family 4 4 3.5 3.5
81 58 45 2,801 53% 1308 47% Single Family 4 4 3.5 3.5
82 58 30 2,447 51% 1203 49% Single Family 4 4 3.5 3.5
83 58 34 1,943 60% 785 40% Single Family 4 4 3.5 3.5
84 58 46 2,869 52% 1376 48% Single Family 4 4 3.5 3.5
85 66 31 2,824 44% 1581 56% Single Family 4 4 3.5 3.5
86 66 34 2,196 53% 1038 47% Single Family 4 4 3.5 3.5
87 55 24 2,888 40% 1730 60% Single Family 4 4 3.5 3.5
Depth Width Area
Avg. 60 37 2,391
Min. 55 20 1,943
Max. 67 52 3,073
1Depth of lot measured along shortest side lot line for irregularly shaped lots. 2Width of lot measured at front yard setback for irregularly shaped lots.

LOT # AREA (SF)
A 4,775
4,775
2%
B 675
D 584
E 964
F 964
G 964
H 913
I 1,350
J 1,515
K 1,555
L 553
M 1,019
N 1,016
O 980
13,050
4%
17,825
6%
LOT # AREA (SF)
C 80,296
80,296
26%

COMMON OPEN SPACE SUMMARY
TYPE
% OF SITE:
% OF SITE:
% OF SITE:
% OF SITE:

TYPE

PRIVATE PARK

PRIVATE PASEOS /

WALKWAYS

PRIVATE ROAD /
ALLEYS
TOTAL COMMON OPEN SPACE:

SUB-TOTAL:

SUB-TOTAL:

TOTAL ROAD & ALLEYS:

ROAD & ALLEYS SUMMARY
S:\Projects\1800\1863 Ruby Estates\Calculations\1863 LOT MATRIX 2

Page 466 ends
Page 467 ends
Page 468 ends

MIEKLE AVENUE COUNTY ROAD 25A GIDDINGS COURT CHAMBERLAIN COURT CHRISTIANSEN CIRCLE 75 74 73 72 76 77 79 78
110
71 125 126
141 HERITAGE REMAINDER AREA - PHASE 1 2015 MB 45
HERITAGE REMAINDER AREA - PHASE 2
2017 MB 82 BANKS DRIVE MURPHY DRIVE ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 1) ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 2) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 2) AG YOLO COUNTY ZONE: P-QP SPRING LAKE SP WOODLAND JOINT UNIFIED SCHOOL DISTRICT ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 1) MIEKLE AVENUE COUNTY ROAD 25A GIDDINGS COURT CHAMBERLAIN COURT CHRISTIANSEN CIRCLE 75 74 73 72 76 77 79 78
110
71 125 126
141 HERITAGE REMAINDER AREA - PHASE 1 2015 MB 45
HERITAGE REMAINDER AREA - PHASE 2
2017 MB 82 BANKS DRIVE MURPHY DRIVE ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 1) ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 2) ZONE: R-4 SPRING LAKE SP (HERITAGE REMAINDER - PHASE 2) AG YOLO COUNTY ZONE: P-QP SPRING LAKE SP WOODLAND JOINT UNIFIED SCHOOL DISTRICT ZONE: R-4 SPRING LAKE SP (OYANG SOUTH PHASE 1) PLANNED DEVELOPMENT OVERLAY EXHIBIT RUBY ESTATES Sacramento Office 103/04/2022 JOB NO: OF SHEET DATE: CCLESG SCALE CHECKED BY: DRAWN BY: DESIGNED BY: 1" = 250' 1 CITY OF WOODLAND CALIFORNIA 1863.01.03 Project Planning Civil Engineering Landscape Architecture 2940 Spafford Stret, Suite 20 Davis, CA 95618 (530) 758-2026 2120 20th Street, Suite Three Sacramento, CA 95818 (916) 455-2026 CECWEST.COM Davis Office ZONE: R-15 ZONE: R-15 WITH P/D OVERLAY SPRING LAKE SP 7.03 ACRES SPRING LAKE SP (PROPOSED RUBY ESTATES SUBDIVISION) 7.03 ACRES EXISTING PROPOSED

Page 469 ends

RESOLUTION NO. _________

RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

WOODLAND CONFIRMING CONSITENCY WITH THE TURN OF THE
CENTURY EIR FOR RUBY ESTATES DEVELOPMENT (MAP No. 5221) WHEREAS, on August 12, 2000, the City Council adopted Resolution No. 4215 Certifying the Environmental Impact Report (EIR)(SCH#99022069) for the Spring Lake Specific Plan (SLSP); and
WHEREAS, on December 18, 2001, the City Council adopted Resolution No. 4330 adopting EIR Addendum #1 to the Certified EIR and approving the Spring Lake Specific Plan; and
WHEREAS, on November 19, 2002, the City Council adopted Resolution No. 4399 adopting EIR Addendum #2 to the Certified EIR and approving Amendment #1 to the Spring Lake Specific Plan; and
WHEREAS, on December 17, 2002, the City Council adopted Resolution No. 4406 adopting EIR Addendum #3 to the Certified EIR and approving Amendment #2 to the Spring Lake Specific Plan; and
WHEREAS, on April 15, 2003, the City Council adopted EIR Addendum #4 for the proposed Williamson Act Rescission Agreement for the Russell Property; and WHEREAS, on August 19, 2003, the City Council adopted Resolution No. 4467 adopting the Final Supplemental EIR to the Certified EIR and approving the Spring Lake Specific Plan OffSite Infrastructure Facilities; and WHEREAS, on May 4, 2004, the City Council adopted Resolution No. 4537 adopting EIR Addendum #1 to the Supplement to the Turn of the Century Specific Plan EIR to address offsite infrastructure facilities; and
WHEREAS, on October 19, 2004, the City Council held a noticed public hearing to consider EIR Addendum #5 and Spring Lake Specific Plan Amendment #3; and WHEREAS, on February 27, 2007, the City Council held a noticed public hearing to consider EIR Addendum #6 and Spring Lake Specific Plan Amendment #4, for the purposes of amending the plan based on a request by Reynen and Bardis for the Spring Lake Central project; and
WHEREAS, on November 16, 2010, the City Council held a noticed public hearing to consider EIR Addendum #7 and Spring Lake Specific Plan Amendment # 5 for the purposes of amending the plan based on a request by Gibson Ogden Investors, LLC to remove a bike overcrossing on Gibson Road and a bike path east of the High School; and

Page 470 ends

WHEREAS, on December 14, 2010, the City Council held a noticed public hearing to consider EIR Addendum #8 and Spring Lake Specific Plan Amendment #6 for the purposes of amending the plan based on a request by Cal West Investors, LLC to modify land use designations and rezone a school site; and
WHEREAS, on March 5, 2013, the City Council held a noticed public hearing to consider EIR Addendum #9 and Spring Lake Specific Plan Amendment #7 for the purposes of amending the plan based on a request by ALC IV Woodland Spring Lake, LLC to modify land use designations and rezone a school site; and
WHEREAS, on June 17, 2014, the City Council held a noticed public hearing to consider EIR Addendum #10 and Spring Lake Specific Plan Amendment #8 for the purposes of amending the Plan based on a request by the Turn of The Century, LLC amending the Spring Lake Specific Plan land use designations, Spring Lake Specific Plan Design Standards Table 2.4 (Minimum Lot Width), and the Spring Lake Affordable Housing Plan (50-unit limit); and WHEREAS, on February 3, 2015, the City Council held a noticed public hearing to consider EIR Addendum #11 for the purposes of amending the Spring Lake Specific Plan based on a request by Cal West Investors, LLC, and Optimistic Partners, LLC to rezone portions of the Cal West project site; and
WHEREAS, on May 5, 2015, the City Council held a noticed public hearing to consider EIR Addendum #12 for the purposes of amending the Spring Lake Specific Plan based on a request by Woodland Spring Lake Partnership to rezone portions of the Spring Lake Central project site; and

WHEREAS, on September 1, 2015, the City Council held a noticed public hearing to consider the proposed EIR Addendum #13 for the purposes of amending the Spring Lake Specific Plan based on a request by Turn of the Century, LLC, to rezone portions of the Heritage Remainder Area Project Site; and
WHEREAS, on November 15, 2016, the City Council held a noticed public hearing to consider the proposed EIR Addendum #14 for the purposes of amending the Spring Lake Specific Plan based on a request by Vacaville Land Investors, LLC, to rezone portions of the Oyang North Project Site; and
WHEREAS, on November 15, 2016, the City Council held a noticed public hearing to consider the proposed EIR Addendum #15 for the purposes of amending the Spring Lake Specific Plan based on a request by Vacaville Land Investors, LLC, to rezone portions of the Oyang South project site; and
WHEREAS, on July 2, 2019, the City Council held a noticed public hearing to consider the proposed EIR Addendum #16 for the purposes of amending the Spring Lake Specific Plan based on a request by Darkhorse Estates, LLC, to rezone portions of the of the Merritt Ranch (Merritt 3/8) Project Site; and

Page 471 ends

WHEREAS, on October 5, 2019, the City Council held a noticed public hearing to consider the proposed EIR Addendum #17 for the purposes of amending the Spring Lake Specific Plan based on a request by Pioneer-Woodland, LLC, to rezone portions of the of the Pioneer Village (Merritt 5/8) Project Site; and
WHEREAS, on September 1, 2020, the City Council held a noticed public hearing to consider the proposed EIR Addendum #18 for the purposes of amending the Spring Lake Specific Plan based on a request by Lennar Homes, to rezone a 3.5 acre infill parcel from R-8 to R-15.

WHEREAS, the proposed project is consistent with the Spring Lake Specific Plan Environmental Impact Report (SCH #99022069, Turn of the Century EIR) certified on August 15, 2000 and adoption of addenda to the Turn of the Century EIR dated December 18, 2001, November 19, 2002, December 17, 2002, and April 15, 2003. The proposed project is below the maximum allowed density on the properties and consistent with the Ruby Estates Tentative Subdivision Map No 5221 and Development Agreement approved August 16, 2022. A Swainson Hawk and Agricultural mitigation agreement with the Merritt Ranch Conservation Easement was recorded November 27, 2006, for the original Beeghly Ranch subdivision, SM 4793, which the Heritage Remainder Phase 1 (Ruby Estates) lot.

WHEREAS, the SLSP requires that each development application include certain projectlevel and project-specific technical analyses to demonstrate consistency with the performance thresholds and requirements of the SLSP and SLSP Mitigation Monitoring Plan (MMP). All the required studies have been submitted for the subject project and reviewed by staff, and the following conclusions have been reached: a) the studies satisfy the SLSP requirements; b) applicable requirements or conditions recommended in the studies have been included in the conditions of approval for the subject project; c) the studies identify no environmental circumstances specific to the subject site or the proposed project that were not previously anticipated and addressed in the original EIR and later addenda; and WHEREAS, the City of Woodland hereby finds that these studies provide the substantial evidence demonstrating that the Project as conditioned is consistent with the adopted Specific Plan and fulfills all conditions and CEQA mitigation measures; therefore, pursuant to Section 65457(a) of the California Government Code and Section 15182(a) of the CEQA Guidelines, no other CEQA clearance is required for the City to take action to approve this Project NOW, THEREFORE, IT IS HEREBY RESOLVED, that the City Council of the City of Woodland hereby takes the following actions:

1. Affirms that the proposed project is consistent with the Spring Lake Specific Plan Environmental Impact Report (SCH #99022069, Turn of the Century EIR) certified on August 15, 2000 and with prior addenda to the Turn of the Century EIR.

2. Affirms that the project is below the maximum allowed density on the properties as allowed in the Spring Lake Specific Plan and as evaluated in the EIR and subsequent amendments;

Page 472 ends