Yorba Linda 2022 PMP Update
7-Year Work Plan under Scenario 1 City's Existing Budget Local Network
Sorted by Treatment Year
Street ID Street Name Section
ID From To FC Length (ft)
Width
(ft)
Last
Inspected
Date
2022
PCI Treatment Type Treatment Cost
Treatment
Year
HUGGAV GGINS AVE 01 ROSE DR JEANEAN LN R 660 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 13,375.00 LONGCRCI NCREST CIRCLE 01 HUGGINS AVE END CDS R 89 33 10-02-2018 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 4,071.00 MIMODR MOSA DR 01 EL CAJON AVE N END CDS R 157 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 5,333.00 MIMODR MOSA DR 02 EL CAJON AVE S END CDS R 415 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 10,122.00 ORTERRACE ANGE TERRACE 01 VALLEY VIEW END CDS R 437 37 10-02-2018 88 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 11,513.00 PEATRELN ACH TREE LN 01 APPLE ORCHARD DR END CDS R 268 33 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 7,327.00 PRENTDR ENTISS DR 01 LOIE ST END CDS R 636 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 14,224.00 PRENTPL ENTISS PL 01 PRENTISS DR END CDS R 108 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 2,005.00 RANCLN NCHO LN 01 PROSPECT AVE W END CDS R 577 33 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 13,129.00 RCHFIELD CHFIELD WAY 01 YORBA LINDA BLVD END CDS R 225 37 10-02-2018 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 7,102.00 REGDR GULUS DR 01 VAN BUREN ST BRIARHILL DR R 557 37 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 11,592.00 REPNRD D PINE RD 01 VALLEY VIEW CIR CDS R 651 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 14,372.00 RICDR CARDO DR 01 PACIFIC AVE END CDS R 215 33 10-02-2018 84 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 6,410.00 ROXDADR XDALE DR 01 END CDS END R 400 33 10-02-2018 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 9,844.00 SCNDST COND ST 02 MARDA AVE LOS ANGELES ST R 630 37 10-02-2018 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 13,111.00 SILMAPDR LVER MAPLE DR 01 NORTH CDS SOUTH CDS R 532 34 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 14,751.00 SWTBYCT EET BAY CT 01 IRON BARK WY CDS R 203 33 10-02-2018 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 6,057.00 TRX IX CIR 01 BASTANCHURY RD END CDS R 126 33 10-02-2018 90 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 4,758.00 VANBUR N BUREN ST 01 REGULUS DR YORBA LINDA BLVD R 465 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 9,193.00 VANBURCI N BUREN CIRCLE 01 VAN BUREN ST END CDS R 52 37 10-02-2018 93 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 3,502.00 VISTLN STA LN 01 RANCHO LN END CDS R 120 33 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 4,647.00 VSTAVIZ STA VIZCAINO 01 CAMINO CABRILLO CAMINO AYALA R 205 33 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 3,805.00 WLNTWS LNUT ST 01 THIRD ST END CDS R 508 33 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 11,848.00 WLNTWS LNUT ST 02 VALLEY VIEW AVE SECOND ST R 671 37 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 13,964.00 WLNTWS LNUT ST 03 SECOND ST THIRD ST R 614 37 10-02-2018 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2025-2026 12,778.00 ASPGLOCI PENGLOW CIRCLE 01 ASPENGLOW LN END CDS R 133 33 10-02-2018 76 2 in Overlay + 2% BR $ FY 2025-2026 16,835.00 CSLOM SA LOMA AVE 02 BROOKLYN AVE BASTANCHURY RD R 1,152 33 10-02-2018 76 2 in Overlay + 2% BR $ FY 2025-2026 73,648.00 ORANDR ANGE DR 03 100'' W/O BRIARHILL VALLEY VIEW AVE R 1,274 33 10-02-2018 75 2 in Overlay + 2% BR $ FY 2025-2026 81,447.00 PRSPCT OSPECT AVE 03 BASTANCHURY RD HILLCREST CIRCLE R 2,050 33 10-02-2018 74 2 in Overlay + 2% BR $ FY 2025-2026 131,057.00 SARAFLN N RAFAEL LN 01 VALLEY VIEW CIR SANTA CLARA CT R 314 36 10-02-2018 76 2 in Overlay + 2% BR $ FY 2025-2026 21,899.00 STACLCT NTA CLARA CT 01 WEST CDS EAST CDS R 280 28 10-02-2018 80 2 in Overlay + 2% BR $ FY 2025-2026 23,071.00 PACAV CIFIC AVE 03 LA CONCETTA DR RICARDO DR R 243 33 10-02-2018 82 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2025-2026 8,520.00 CHIANCT IANTI CT 01 TRENTINO LN GENOA WY R 2,378 33 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 45,902.00 CHURCDOWDR URCHILL DOWNS DR 01 OAKLAWN LN CDS R 327 33 10-02-2018 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 8,693.00 CLEVLNBYLN EVELAND BAY LN 02 JUTLAND LN CDS R 341 32 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 8,763.00 CLYDSDLEDR YDESDALE DR 01 BASTANCHURY RD BRETON LN R 1,462 47 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 40,193.00 CORTCT RTONA CT 01 E CDS W CDDS R 1,496 33 94 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 33,909.00 DELALNANS A DE LA LUNA N/S 01 AVENIDA PUESTA DEL SOL END CDS R 748 33 10-01-2019 92 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 16,955.00 DELAPLZASS A DE LA PLAZA S/S 01 AVENIDA DEL RAY END CDS R 734 33 10-01-2019 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 16,684.00 DLRNCHO A DEL RANCHO 01 PUESTA DEL SOL END CDS R 537 33 10-01-2019 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 12,882.00 FLORRD ORENCE RD 01 CORTONA CT CDS R 835 33 94 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 18,634.00 GENOWY NOA WY 01 CHIANTI CT CDS R 1,862 33 94 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 38,458.00 HOOSLAWY OSIER LAWN WY 01 OAKLAWN LN CDS R 754 33 10-02-2018 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 16,935.00 JUTLNDLN TLAND LN 01 MORGAN CT CDS R 1,026 32 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 21,585.00 KRUGRST UEGER ST 01 BASTANCHURY RD OAKLAWN LN R 128 36 10-02-2018 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 2,696.00 LACUSTA CUESTA CIR 01 LA ENTRADA END CDS R 256 33 10-01-2019 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 7,458.00
Yorba Linda 2022 PMP Update
7-Year Work Plan under Scenario 1 City's Existing Budget Local Network
Sorted by Treatment Year
Street ID Street Name Section
ID From To FC Length (ft)
Width
(ft)
Last
Inspected
Date
2022
PCI Treatment Type Treatment Cost
Treatment
Year
LAPRMVRA A LA PRIMAVERA 01 AVENIDA PUESTA DEL SOL END CDS R 635 33 10-01-2019 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 14,773.00 LAQNTA A LA QUINTA 01 AVENIDA PUESTA DEL SOL END CDS R 556 33 10-01-2019 91 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 13,249.00 LIVORNWY VORNO WY 01 CHIANTI CT CDS R 571 33 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 13,538.00 LRCA RCA LN 01 FAIRMONT BLVD ORLANDO DR R 143 33 07-01-2019 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 2,761.00 MILANCT LANO CT 01 TRENTINO LN GENOA WY R 1,940 33 91 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 37,448.00 NAPCT PLES CT 01 UMBRIA WY CDS R 833 33 94 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 18,595.00 PASFINWY SO FINO WY 01 CLYDESDALE DR CDS R 677 32 10-02-2018 86 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 15,052.00 PIMLTER MLICO TER 01 SANTA ANITA WAY CDS R 472 34 10-02-2018 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 11,768.00 QUIMEADLN IET MEADOW LN 01 ARBOR GATE LN COBBLESTONE CT R 285 33 10-01-2019 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 5,502.00 RAINBLN INBOW LN 01 WEATHERLY DR END CDS R 424 33 10-01-2019 92 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 10,701.00 SGVIA GOVIA LN 01 CASIANO DR END OF CDS R 325 33 10-01-2019 90 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 7,075.00 SOHILLSWY UTHERN HILLS WY 01 LAKEVIEW AVE W HILLS WY R 388 33 10-01-2019 88 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 7,490.00 SYCAMCI CAMORE CIRCLE 01 AVOCADO AVE END CDS R 484 34 10-01-2019 85 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 12,142.00 TEMHRSCT MHURST CT 01 OAKLAWN LN CDS R 310 32 10-02-2018 89 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 8,183.00 TRENLN ENTINO LN 01 FAIRMONT BLVD CORTONA CT R 1,424 37 94 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 30,819.00 TUSWY SCANY WY 01 TRENTINO LN VOLTERRA LN R 352 33 92 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 6,795.00 UMBWY BRIA WY 01 TRENTINO LN CDS R 2,620 37 93 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 59,219.00 VIAALGRE A ALEGRE 01 AVENIDA DEL NORTE END CDS R 396 33 10-01-2019 91 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 10,160.00 VOLTERLN LTERRA LN 01 TUSCANY WY CDS R 423 33 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 10,681.00 VRONA RONA LN 01 CASIANO DR END CDS R 596 36 10-01-2019 92 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 15,067.00 ZAHARIDG HARIAS RIDGE 01 LAKEVIEW AVE SARAZEN CT R 975 37 10-02-2018 87 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2026-2027 21,102.00 CARRERD RRERA RD 01 BASTANCHURY RD CHIANTI CT R 140 55 77 2 in Overlay + 2% BR $ FY 2026-2027 13,781.00 FRSTGLN REST GLEN RD 01 RIM CREST DR END CDS R 728 29 07-01-2015 67 2 in Overlay + 2% BR $ FY 2026-2027 51,202.00 PLUDR UMOSA DR 02 CARI LN BASTANCHURY RD R 1,168 33 10-01-2019 77 2 in Overlay + 2% BR $ FY 2026-2027 77,657.00 CITRDOAV TRIO DORA AVE 01 SYCAMORE CIRCLE EVERGREEN AVE R 290 34 10-01-2019 82 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 11,447.00 COUPCT UPLES CT 01 HOGAN DR CDS R 157 33 10-02-2018 84 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 10,477.00 DEBLN BI LN 01 EUREKA LN END CDS R 623 33 10-01-2019 80 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 27,467.00 DLNRTE ENIDA DEL NORTE 02 VIA ALEGRE AVENIDA RIO DEL ORO R 266 36 10-01-2019 83 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 10,581.00 EURKA REKA AVENUE 03 IMPERIAL HWY YORBA LINDA BLVD R 1,741 36 10-01-2019 76 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 69,249.00 NICKLRD CKLAUS RD 01 SHEEHAN ST CDS R 796 33 10-02-2018 80 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 33,775.00 PIPPL PER PL 02 LAKEVIEW AVE PLUMOSA DR R 1,224 37 10-01-2019 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 50,038.00 PSTADLSLWS ESTA DEL SOL W/S 01 AVENIDA RIO DEL ORO AVENIDA DE LAS FLORES R 1,030 36 10-01-2019 81 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 40,969.00 RIODLORO ENIDA RIO DEL ORO 02 AVENIDA DEL NORTE PUESTA DEL SOL N/S R 2,360 36 10-01-2019 83 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 94,422.00 SARAZCT RAZEN CT 01 ZAHARIAS RIDGE CDS R 626 33 10-02-2018 84 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 27,577.00 SCHST HOOL ST 03 AVOLINDA DR PIPER PL R 356 33 10-01-2019 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 12,980.00 SHALN ARON CIRCLE 01 KAYE LN END CDS R 159 33 10-01-2019 80 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 10,550.00 VALAVE LENCIA AVE 03 PIPER PL END CDS R 94 33 10-01-2019 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2026-2027 8,180.00 DELOSMNTNS A DE LAS MONTANAS 01 AVENIDA DE LAS FLORES END CDS R 55 27 10-01-2019 69 2 in Overlay+10% Localized Inlay+5% BR $ FY 2026-2027 5,309.00 PEPPRGRVE PPERGROVE ST 01 END OF CDS LAKEVIEW AVE R 816 33 05-28-2021 83 2 in Overlay + 2% BR $ FY 2027-2028 65,436.00 TERLINLN RRA LINDA LN 01 VAN BUREN ST HARVEST WAY R 120 33 05-28-2021 81 2 in Overlay + 2% BR $ FY 2027-2028 8,298.00 BUEVISAV ENA VISTA AVE 03 RICHFIELD RD E HIGHLAND R 1,940 60 05-28-2021 82 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 133,751.00 CANDLIGTLN NDLELIGHT LANE 01 MARIPOSA AVE END CDS R 471 33 05-28-2021 80 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 22,802.00 CASCADAV SCADES AVE 01 REDWOOD ST CITY LIMIT R 653 33 11-01-2012 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 24,762.00 CUMBECI MBERLAND CIRCLE 02 JEFFERSON ST END CDS R 669 33 11-01-2012 83 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 30,310.00 HTHR ATHER WAY 01 HIGHLAND AVE LAKEVIEW AVE R 1,082 33 05-28-2021 84 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 41,029.00 MARIPOAVE RIPOSA AVE 01 HIGHLAND AVE LAKEVIEW AVE R 996 33 05-28-2021 84 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 37,768.00
Yorba Linda 2022 PMP Update
7-Year Work Plan under Scenario 1 City's Existing Budget Local Network
Sorted by Treatment Year
Street ID Street Name Section
ID From To FC Length (ft)
Width
(ft)
Last
Inspected
Date
2022
PCI Treatment Type Treatment Cost
Treatment
Year
OHIOST IO ST 04 LINDA VERDE BUENA VISTA AVE R 467 37 05-28-2021 80 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 19,855.00 REDWODST DWOOD ST 01 CASCADES AVE CUMBERLAND CIR R 679 33 11-01-2012 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 25,748.00 SARATST RATOGA ST 01 CUMBERLAND CIR CASCADES AVE R 669 33 11-01-2012 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 25,368.00 SCNCVW ENIC VIEW DR 01 OHIO ST BUENA VISTA AVE R 1,118 33 05-28-2021 79 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2027-2028 42,394.00 KINSPDR NGSPORT DR 01 CARRIAGE CIR CUMBERLAND CIR R 200 33 10-01-2013 69 2 in Overlay+10% Localized Inlay+5% BR $ FY 2027-2028 24,536.00 ACACHLL ACACIA HILL DR 01 END CDS COUNTRY VIEW R 1,072 29 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 22,390.00 ACACHLL ACACIA HILL DR 02 COUNTRY VIEW COUNTRY VIEW R 1,131 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 23,930.00 AMBRDLE AMBERDALE DR 01 FAIRMONT BL CANYON DR R 2,929 37 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 68,564.00 ARRYOCJNEB ARROYO CAJON E/B 01 KELLOG DR FOXFIELD LANE R 2,046 23 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 29,772.00 ARRYOCJNWB ARROYO CAJON W/B 01 FOXFIELD LANE KELLOGG R 2,049 23 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 31,638.00 ASTR ASTER LN 01 LUPINE ST END CDS R 279 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 8,546.00 BGSPRNG BIG SPRING DR 01 FAIRMONT BLVD WALNUT CREEK DR R 230 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 4,802.00 BLUFLDPLZA BLUEFIELD PLAZA 01 OAK MEADOW DR END CDS R 671 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 14,009.00 BRDLE BRIDLE LN 01 SADDLETREE LN END OF CDS R 359 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 10,217.00 BRKHLL BROOKHILL DR 01 OLD RANCH END CDS R 1,506 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 31,442.00 BRKMNT BROOKMONT DR 01 END CDS CANYON DR R 1,498 36 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 34,119.00 BRLGH BURLEIGH DR 01 MANOR VIEW DR END CDS R 655 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 16,397.00 CNTRYVW COUNTRY VIEW DR 01 END CDS ACACIA HILL DR R 2,468 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 54,248.00 CNYNDRVE CANYON DRIVE 01 BROOKMONT DR FAIRMONT BLVD R 2,964 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 61,882.00 CPRCEDR CAPRICE DR 01 MANOR VIEW END CDS R 680 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 16,918.00 CRSTKNLL CRESTKNOLL DR 01 CANYON DR CITY BOUNDARY R 874 36 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 19,906.00 DEERFTLNE DEERFOOT LANE 01 ARROYO CAJON END CDS R 228 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 7,482.00 DNSMURPLZA DUNSMUR PLAZA 01 OAKMEADOW DR END CDS R 564 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,776.00 DRLCRT DORAL CT 01 WAGON WHEEL END CDS R 88 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 4,559.00 FLCIA FELICIA DR 01 AVENIDA RIO DEL ORO LUPINE ST R 1,970 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 41,130.00 FRLYNNBLVD FAIRLYNN BLVD 01 BROOKMONT DR CRESTKNOLL R 819 37 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 19,172.00 FRNCECRK FURNACE CREEK RD 01 WALNUT CREEK RD FAIRMONT BLVD R 1,306 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 27,900.00 FRNGLNDR FERN GLEN DR 01 AMBERDALE DR CANYON DR R 1,785 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 37,267.00 FRNWDPLZA FERNWOOD PLAZA 01 OAK MEADOW DR END CDS R 550 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,483.00 FTRADR FUTURA DR 01 FAIRMONT BLVD END CDS R 621 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 15,687.00 FXFLD FOX FIELD LN 01 ARROYO CAJON DR PARKSIDE DR R 1,132 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 23,634.00 GLNDLEDR GLENDALE DR 01 LARKRIDGE DR CRESTKNOLL DR R 438 36 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,976.00 GLNDLEDR GLENDALE DR 02 CRESTKNOLL DR CANYON DR R 438 36 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,976.00 GLNHVN GLEN HAVEN DR 01 FERNGLEN DR FAIRMONT BLVD R 1,043 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 22,092.00 GLNPL GLEN PL 01 FERNGLEN DR END CDS R 225 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 7,419.00 GRNLFPLZA GREEN LEAF PLAZA 01 OAK MEADOW DR END CDS R 542 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,316.00 HBSCS HIBISCUS CIR 01 FELICIA DR END CDS R 61 27 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 3,764.00 HLLCKVW HILLCOCK VIEW PLAZA 01 RIDGEWOOD PL END CDS R 668 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 14,580.00 HLLSD HILLSIDE DR 01 CANYON DR RIVERVIEW DR R 969 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 20,231.00 HLLTP HILLTOP PL 01 HILLSIDE DR END CDS R 200 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,897.00 KNGSBRR KINGSBRIAR DR 02 PARKVIEW RIDGEWOOD PL R 1,008 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 21,045.00 LMNS LE MANS CIR 01 MANOR VIEW DR END CDS R 429 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,678.00 LNCEWDPLZA LANCEWOOD PLAZA 01 OAK MEADOW DR END CDS R 551 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,504.00 LPINE LUPINE ST 01 AVENIDA RIO DEL ORO END CDS R 1,960 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 43,642.00 LRKFLD LARKFIELD DR 01 KINGSBRIAR DR OAK MEADOW DR R 250 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,220.00 LRKFLD LARKFIELD DR 02 OAKMEADOW DR END CDS R 456 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,521.00
Yorba Linda 2022 PMP Update
7-Year Work Plan under Scenario 1 City's Existing Budget Local Network
Sorted by Treatment Year
Street ID Street Name Section
ID From To FC Length (ft)
Width
(ft)
Last
Inspected
Date
2022
PCI Treatment Type Treatment Cost
Treatment
Year
LRKRDGE LARKRIDGE DR 01 CITY BOUNDARY GLENDALE DR R 151 36 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 3,440.00 LYNNBRK LYNNBROOK PZ 01 END CDS END CDS R 1,563 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 32,632.00 MNRVW MANOR VIEW DR 01 FUTURA DR CAPRICE DR R 1,184 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 24,720.00 MOUNTNVW MOUNTAIN VIEW AVE 02 LYNNBROOK PZ COUNTRY VIEW DR R 342 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 7,141.00 NVADR NOVA DR 01 MANOR VIEW DR FAIRMONT BLVD R 140 37 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 3,278.00 OKMDW OAK MEADOW DR 01 FAIRMONT BLVD BROOKMOUNT DR R 2,921 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 60,984.00 PASEOARN PASEO ARNALDO 01 PASEO LORENZO N END CDS R 140 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,644.00 PASGILB PASEO GILBERTO 01 VISTA MONTANA PASEO LORENZO R 1,600 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 33,405.00 PASJOAQ PASEO JOAQUIN 01 PASEO LORENZO END CDS R 502 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 13,202.00 PASLOR PASEO LORENZO 01 PASEO GILBERTO VISTA LAGUNA R 1,261 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 26,644.00 PASLUI PASEO LUIS 01 PASEO GILBERTO END CDS R 764 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 18,672.00 PEPPRTRLNE PEPPERTREE LANE 01 SADDLETREE LN END CDS R 430 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 12,015.00 PLCRVLLE PLACERVILLE PL 01 FURNACE CREEK RD END CDS R 142 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,686.00 PRKHRST PARKHURST PL 01 COUNTRY VIEW DR END CDS R 715 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 17,649.00 PRKRDGE PARK RIDGE 01 KELLOG WAGON WHEEL R 122 30 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 2,316.00 PRKSDEDR PARKSIDE DR 01 SADDLETREE LANE COUNTRY VIEW DR R 1,052 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 21,964.00 PRKVW PARKVIEW TER 01 OAK MEADOW DR LYNNBROOK PZ R 475 34 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 10,851.00 PRKVWES PARKVIEW TER 01 OAK MEADOW DR KINGSBRIAR DR R 244 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,095.00 RDGWDPLCE RIDGEWOOD PL 01 KINGSBRAIR DR OAK MEADOW DR R 217 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 4,531.00 RDGWDPLCE RIDGEWOOD PL 02 OAK MEADOW DR BROOKHILL DR R 1,075 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 22,760.00 RIODLORO AVENIDA RIO DEL ORO 03 YORBA LINDA BLVD FELICIA DR R 415 40 07-01-2015 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,515.00 RIVRVW RIVERVIEW DR 01 END CDS GLENDALE DR R 572 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 14,664.00 SDDLTREELN SADDLETREE LANE 01 PEPPERTREE LANE END CDS R 1,720 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 38,631.00 SHDYGLNPL SHADY GLEN PL 01 FAIRMONT BLVD END OF CDS R 319 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,805.00 SMCRDGE SUMAC RIDGE 01 STONE CANYON END CDS R 540 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 13,996.00 SMRVLLE SOMERVILLE CIR 01 WALNUT CREEK RD END CDS R 164 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,146.00 SNDSPNT SANDS POINT 01 STONE CANYON END CDS R 116 32 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,070.00 SNDYHLLLNE SANDY HILL LANE 01 ARROYO CAJON DR PARK SIDE DR R 1,227 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 25,618.00 STNECNYN STONE CANYON AVE 01 WAGON WHEEL DR WAGON WHEEL DR R 1,320 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 28,192.00 STNECRSTLN STONECREST LANE 01 ARROYO CAJON DR END CDS R 611 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 15,478.00 STNEHRST STONEHURST PZ 01 CANYON DR END CDS R 557 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,629.00 SUNMST SUNMIST DR 01 ARROYO CAJON DR MOUNTAIN VIEW AVE R 1,570 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 32,779.00 SWTWTR SWEETWATER PL 01 FURANCE CREEK RD END CDS R 92 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 4,642.00 TRLCRST TRAIL CREST LN 01 SADDLETREE LN END CDS R 629 27 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 13,466.00 TYNTRRCE TOYON TERRACE 01 COUNTRY VIEW DR END CDS R 76 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 4,308.00 VIAADLA VIA ADELA 01 VISTA LAGUNA END CDS R 303 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,048.00 VIAALMRA VIA ALMERIA 01 VISTA DEL MAR END CDS R 633 34 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 16,338.00 VIABDLMA VIA BADALONA 01 VISTA DEL MAR END CDS R 431 34 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,993.00 VIABRGSWS VIA BURGOS 01 VISTA DEL MAR W END CDS R 700 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 17,336.00 VIABRGSWS VIA BURGOS 02 VISTA DEL MAR E END CDS R 200 33 07-01-2015 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,897.00 VIACANRS VIA CANARIAS 01 VISTA DEL MAR END CDS R 687 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 14,344.00 VIACLSTNA VIA CELESTINA 01 VISTA DEL MAR END CDS R 1,259 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 29,323.00 VIADNIEL VIA DANIEL 01 VISTA LAGUNA END CDS R 505 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 13,265.00 VIADNLDO VIA DONALDO 01 VISTA MONTANA END CDS R 642 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 16,125.00 VIAELTAVO VIA EL TAJO 01 VISTA DEL MAR E END CDS R 440 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,187.00 VIAESTR VIA ESTER 01 VISTA LAGUNA END CDS R 452 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 12,158.00
Yorba Linda 2022 PMP Update
7-Year Work Plan under Scenario 1 City's Existing Budget Local Network
Sorted by Treatment Year
Street ID Street Name Section
ID From To FC Length (ft)
Width
(ft)
Last
Inspected
Date
2022
PCI Treatment Type Treatment Cost
Treatment
Year
VIAGDLUPE VIA GUADALUPE 01 VISTA DEL MAR END CDS R 1,362 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 31,157.00 VIAGRLDNA VIA GERALDINA 01 VISTA LAGUNA END CDS R 434 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,783.00 VIAHBNA VIA HABANA 01 VISTA DEL MAR END CDS R 517 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 13,515.00 VIAINFNTA VIA INFANTA 01 VISTA DEL MAR END CDS R 153 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,916.00 VIAISBLLA VIA ISABELLA 01 VIA MARWAH END CDS R 284 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 8,651.00 VIALAVJA VIA LA VIEJA 01 VISTA DEL MAR END CDS R 743 34 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 18,704.00 VIALCIA VIA LUCIA 01 VIA MARWAH END CDS R 193 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,751.00 VIALNRS VIA LINARES 01 VISTA DEL MAR END CDS R 303 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,048.00 VIALRDA VIA LERIDA 01 VISTA DEL MAR END CDS R 422 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,532.00 VIALSVLLS VIA LAS VILLAS 01 VISTA DEL MAR END CDS R 562 34 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 14,810.00 VIAMGDLNA VIA MAGDALENA 01 VISTA DEL MAR END CDS R 436 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,824.00 VIAMGRTA VIA MARGARITA 01 VISTA LAGUNA END CDS R 390 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 10,864.00 VIAMNRSA VIA MANRESA 01 VISAT DEL MAR END CDS R 416 34 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,670.00 VIAMNZNLLO VIA MANZANILLO 01 VISTA DEL MAR END CDS R 992 34 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 24,060.00 VIAMONITA VIA MONITA 01 VIA MIRAMAR W END CDS R 1,150 34 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 24,737.00 VIAMRAMR VIA MIRAMAR 01 VISTA DEL MAR VIA NATILE R 293 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,118.00 VIAMRWHES VIA MARWAH W/S 01 VILLAGE CENTER DR VIA LUCIA R 560 38 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 13,463.00 VIAMRWHES VIA MARWAH W/S 02 VIA LUCIA VISTA MONTANA R 850 38 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 20,435.00 VIANGE VIA ANGELINA 01 S END CDS N END CDS R 814 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 22,437.00 VIANGE VIA ANGELINA 02 E END CDS W END CDS R 722 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 20,516.00 VIANTLIE VIA NATALIE 01 VIA MIRAMAR W END CDS R 1,000 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 20,878.00 VIAPSA VIA PASA 01 VISTA DEL MAR END CDS R 133 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,498.00 VIARCRDO VIA RICARDO 01 VISTA MONTANA END CDS R 382 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 10,697.00 VIASARA VIA SARA 01 VIA MONITA S END CDS R 110 26 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 1,810.00 VIASMUEL VIA SAMUEL 01 VISTA MONTANA END CDS R 463 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 12,388.00 VIASNLCR VIA SAN LUCAR 01 VISTA DEL MAR END CDS R 888 34 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 21,823.00 VIASNTMRNS VIA SANTA MARIA N/S 01 VILLAGE CENTER VISTA DEL MAR R 261 48 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 8,306.00 VIATLVRA VIA TALAVERA 01 VISTA DEL MAR END CDS R 375 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 10,551.00 VIATLVRA VIA TALAVERA 02 VISTA DEL MAR END CDS R 610 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 18,178.00 VIATNRIO VIA TENORIA 01 VISTA DEL MAR END CDS R 314 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,277.00 VIATRHA VIA TARARA 01 VISTA DEL MAR END CDS R 452 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 12,158.00 VIATRRGNA VIA TARRAGONA 01 VISTA DEL MAR END CDS R 828 34 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 20,532.00 VIATRRLBA VIA TORRALBA 01 VISTA DEL MAR END CDS R 324 34 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,691.00 VIATRVDR VIA TROVADOR 01 VISTA DEL MAR END CDS R 745 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 18,276.00 VIAVGO VIA VIGO 01 VIA TALAVERA END CDS R 143 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,707.00 VIAVRDRO VIA VARADERO 01 VISTA DEL MAR END CDS R 588 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 14,998.00 VIAZRGZA VIA ZARAGOZA 01 VISTA DEL MAR END CDS R 782 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 19,048.00 VIGLO VIA GLORIA 01 VISTA MONTANA VIA ANGELINA R 242 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,053.00 VIJUA VIA JUANA 01 VISTA MONTANA END CDS R 341 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 9,841.00 VIVIRGI VIA VIRGINIA 01 VISTA MONTANA VIA ANGELINA R 243 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 5,074.00 VLLGRCIR VILLAGER CIR 01 MANOR VIEW DR END CDS R 430 33 01-20-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 11,699.00 WGNWHL WAGON WHEEL DR 01 STONE CANYON AVE STONE CANYON AVE R 1,300 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 27,142.00 WLNTCRK WALNUT CREEK RD 01 END CDS FURNACE CREEK RD R 836 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 17,454.00 WNCHSTRLNE WINCHESTER LANE 01 SADDLETREE LANE SANDY HILL R 300 33 01-24-2022 95 Crack Seal + Slurry Seal+ 3% Localized Inlay $ FY 2028-2029 6,264.00 COCHWD COACHWOOD LN 01 FAIRMONT BLVD END OF CDS R 460 37 01-20-2022 92 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2028-2029 25,480.00 KNGSBRR KINGSBRIAR DR 01 BROOKMONT DR PARKVIEW R 2,040 33 01-20-2022 92 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ FY 2028-2029 80,449.00
Appendix 3
OCTA Pavement Management Plan
Agency Submittal
City of Yorba Linda
Pavement
Management Plan
Prepared by: NCE
Submitted to OCTA 06-30-22
Pavement Management Plan Agency Submittal
Page | 1
Agency Submittal Table of Contents
I. Pavement Management Plan Certification..................................................................................................... 2 II. Executive Summary......................................................................................................................................... 3 III. Background (Optional).................................................................................................................................... 3 IV. Current Pavement Conditions (PCI) ................................................................................................................ 4 V. Projected Pavement Conditions (PCI)............................................................................................................. 4 VI. Alternative Funding Levels.............................................................................................................................. 5 Maintain Existing Average Network PCI.............................................................................................................. 5 Improve Average Network PCI............................................................................................................................ 5 VII. Current and Projected Backlog by Year of Pavement Maintenance Needs.................................................... 6 VIII. Centerline Mileage.......................................................................................................................................... 6 IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles ............................. 7 X. Reduction in M2 Local Match ......................................................................................................................... 8 XI. Appendix A – Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Levels......................................................................................................................................................... 9 XII. Appendix B – Complete Street Listing Current Conditions........................................................................... 10 XIII. Appendix C – GIS Digital Data ....................................................................................................................... 11 Introduction ...................................................................................................................................................... 11 Structure of GIS Data......................................................................................................................................... 11 XIV. Appendix D – Quality Assurance/Quality Control Plan................................................................................. 13 XV. Appendix E – Pavement Management Data Files......................................................................................... 14 XVI. Appendix F – GIS Maps – Current Conditions (Optional).............................................................................. 15
Pavement Management Plan Agency Submittal
Page | 2
I. Pavement Management Plan Certification
The City of Yorba Linda certifies that it has a Pavement Management Plan in conformance with the criteria stated in the Orange County Transportation Authority (OCTA) Ordinance No. 3. This ordinance requires that a Pavement Management Plan (PMP) be in place and maintained to qualify for allocation of revenues generated from renewed Measure M (M2).
The plan was developed by City of Yorba Linda* using StreetSaver, a pavement management system, conforming to American Society of Testing and Materials (ASTM) Standard D6433, and contains, at a minimum, the following elements:
• Inventory of Master Plan of Arterial Highways (MPAH) streets and local routes reviewed and updated biennially. The last update of the inventory was completed on March, 2022 for MPAH streets and March, 2022 for local streets.
• Assessment of pavement condition for all routes in the system, updated biennially. The last field review of pavement condition was completed on March, 2022.
• Percentage (by pavement area) of all sections of pavement needing:
o Preventative Maintenance: 67.5%
o Rehabilitation: 31.4%
o Reconstruction: 0.9%
• Budget needs for Preventative Maintenance, Rehabilitation, and/or Reconstruction of deficient sections of pavement for:
o Current biennial period $59.9 million
o Following biennial period $7.9 million
• Funds budgeted or available for Preventative Maintenance, Rehabilitation, and/or Reconstruction:
o Current biennial period $17.0 million
o Following biennial period $9.5 million
• Backlog by year of unfunded pavement rehabilitation, restoration, and reconstruction needs. • The PMP is consistent with countywide pavement condition assessment standards as described in the OCTA Countywide Pavement Management Plan Guidelines adopted by the OCTA Board of Directors. *An electronic copy of the PMP (StreetSaver compatible files) has been, or will be, submitted with the certification statement.
A copy of this certification is being provided to the Orange County Transportation Authority.
Submitted by:
Jamie Lai City of Yorba Linda
Name (Print) Jurisdiction
Signed Date
Public Works Director/City Engineer
Title
Pavement Management Plan Agency Submittal
Page | 3
II. Executive Summary
The City of Yorba Linda (City) selected NCE to perform an update of the City’s Pavement Management Plan (PMP). The goal of this project is to update the PMP with current pavement conditions and to perform funding analyses to help inform and educate policy makers as well as to comply with the Orange County Transportation Authority’s (OCTA) Measure M2 Program.
The 2022 PMP update includes an assessment of the MPAH network and 181 sections of the local network. The assessment was completed in March 2022, and results show that the City’s overall weighted PCI for the pavement network is 79, which is in the “Good” category. As a result, the City will stay eligible for the 10 percent reduction in local matching funds for the next two-year cycle.
After the database was updated with maintenance activities that had occurred since 2018 and pavement treatment policies were reviewed, and unit costs were updated. Budget scenarios were run. The results show that the City’s 7-year funding of $43.6 million would decrease the network PCI to 76 by the end of the 7-year analysis period. To maintain the network PCI at 79, the City would need $48.5 million in total in the next 7 years.
Furthermore, it would take approximately $53.5 million to increase the network PCI by one point to 80.
III. Background (Optional)
The City owns and maintains approximately 214.7 centerline miles of pavements, which includes 42.2 miles of the Master Plan of Arterial Highways (MPAH) streets and 172.5 miles of local streets, representing a total replacement cost of $412.4 million.
Pavement Management Plan Agency Submittal
Page | 4
IV. Current Pavement Conditions (PCI)
Current Network PCI Current MPAH PCI Current Local PCI
79 82 78
V. Projected Pavement Conditions (PCI)
The projected PCI is noted by year under existing or expected funding levels for the next seven-fiscal years (“Today” is before June 30, 2022).
Fiscal Year Current Funding Entire Network
PCI MPAH Local
Today 79 82 78
2022-23 $8.2 million 82 80 83
2023-24 $8.8 million 83 81 84
2024-25 $4.5 million 81 78 82
2025-26 $5.0 million 80 79 81
2026-27 $5.4 million 79 79 80
2027-28 $5.7 million 79 80 78
2028-29 $6.0 million 78 78 77
Pavement Management Plan Agency Submittal
Page | 5
VI. Alternative Funding Levels
Maintain Existing Average Network PCI
Fiscal Year Maintain
Funding
Entire Network
PCI MPAH Local
Today 79 82 78
2022-23 $8.2 million 82 80 83
2023-24 $8.8 million 83 81 84
2024-25 $4.5 million 81 78 82
2025-26 $5.0 million 80 79 81
2026-27 $6.5 million 80 79 80
2027-28 $6.5 million 79 80 79
2028-29 $9.0 million 79 79 79
Improve Average Network PCI
Fiscal Year Improve Funding Entire Network
PCI MPAH Local
Today 79 82 78
2022-23 $8.2 million 82 80 83
2023-24 $8.8 million 83 81 84
2024-25 $5.0 million 81 78 83
2025-26 $6.0 million 81 79 81
2026-27 $7.0 million 80 79 81
2027-28 $8.5 million 80 80 80
2028-29 $10.0 million 80 79 80
Pavement Management Plan Agency Submittal
Page | 6
VII. Current and Projected Backlog by Year of Pavement Maintenance Needs
Fiscal Year Current Funding
Backlog ($ million)
Maintain PCI Backlog
($ million)
Increase PCI Backlog
($ million)
Today 24.0 24.0 24.0
2022-23 24.0 24.0 24.0
2023-24 35.8 35.8 35.8
2024-25 40.3 40.3 39.8
2025-26 44.3 44.3 42.6
2026-27 47.6 46.6 44.3
2027-28 47.6 45.7 41.3
2028-29 58.9 52.9 47.3
VIII. Centerline Mileage
Entire Pavement Network MPAH Local Streets
214.7 42.2 172.5
Pavement Management Plan Agency Submittal
Page | 7
IX. Percentage of Network in Each of Five Condition Categories Based on Centerline Miles
Condition
Category PCI Range Network
Percent
Area of
Total
Pavement
Area of
Pavement
(sf)
Percent
Centerline
Mileage of
Network
Centerline
Mileage of
Network
Very Good 86-100
MPAH 11.4% 5,158,444
36.9%
19.4 Local 25.6% 11,533,563 59.7
Good 75-85
MPAH 8.1% 3,659,501
31.4%
13.9 Local 22.5% 10,132,488 53.6
Fair 60-74
MPAH 6.1% 2,736,977
23.7%
8.4 Local 18.8% 8,475,125 42.5
Poor 41-59
MPAH 0.2% 79,420
7.0%
0.3 Local 6.4% 2,863,284 14.7
Very Poor 0-40
MPAH 0.1% 60,240
1.0%
0.3 Local 0.8% 357,522 2.0
Pavement Management Plan Agency Submittal
Page | 8
X. Reduction in M2 Local Match
A local agency match reduction of 10% of the eligible cost for projects submitted for consideration of funding through the M2 Comprehensive Transportation Funding Programs (CTFP) call for projects is available if the local agency either:
a. Shows measurable improvement of paved road conditions during the previous reporting period defined as an overall weighted (by area) average system improvement of one PCI point with no reduction in the overall weighted (by area) average PCI in the MPAH or local street categories; or
b. Have road pavement conditions during the previous reporting period, within the highest 20% of the scale for road pavement conditions in conformance with OCTA Ordinance No. 3, defined as a PCI of 75 or higher, otherwise defined as in “good condition”.
The City of Yorba Linda has met the criteria above by maintaining an average weighted PCI above 75. This means the City will be eligible for the 10 percent reduction in local matching fund for the next two-year cycle.
Pavement Management Plan Agency Submittal
Page | 9
XI. Appendix A – Seven-Year Road Maintenance and Rehabilitation Plan Based on Current or Expected Funding Levels
The seven-year plan for road maintenance and rehabilitation should be based on current and projected budget.
Street sections selected for treatment should be identified here. Specific data to be submitted should follow the format below:
MPAH
Limits of Work
Street Name From To Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
LOCAL
Limits of Work
Street Name From To Length of
Segment
Width of
Segment
Pavement
Area
Type of
Treatment
Cost of
Treatment
Year of
Treatment
Please attach the seven-year road maintenance and rehabilitation plan, following the above template, after this sheet. The plan should be labeled Appendix A.
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding MPAH
Sorted by Year of Treatment
MPAH
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment BASTANCHURY RD EUREKA S/S CASA LOMA E/S 1,320 41 60,240 Overlay - AC Thin $ - FY 2022-2023 LAKEVIEW AVE LEMON DR ORIENTE S/S 895 60 53,700 Overlay - AC Thin $ - FY 2022-2023 LAKEVIEW AVE ORIENTE S/S 600FT S/O S H 630 60 37,800 Overlay - AC Thin $ - FY 2022-2023 LAKEVIEW AVE 120'' N/O SOUTHERN HILLS BASTANCHURY S/S 635 34 21,590 Overlay - AC Thin $ - FY 2022-2023 VILLAGE CENTER DR N/B FAIRMONT BLVD N/S VIA SANTA MARIA 1,384 29 45,336 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR N/B VIA SANTA MARIA N/S VIA ALCANTARA N/S 2,225 29 64,525 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR N/B VIA ALACANTARA PASEO DE LAS PALOMAS S/S 1,514 29 49,106 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR N/B PASEO DE LAS PALOMAS S/S VIA MARWAH 1,641 29 52,789 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR N/B VIA MARWAH N/S YORBA LINDA N/S 1,864 29 59,256 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR S/B YORBA LINDA BLVD N/S VISTA LAGUNA S/S 1,956 29 61,924 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR S/B VISTA LAGUNA S/S PASEO DE LAS PALOMAS S/S 1,586 29 51,194 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR S/B PASEO DE LAS PALOMAS S/S VIA SANTA MARIA N/S 3,634 29 115,786 SLURRY SEAL $ - FY 2022-2023 VILLAGE CENTER DR S/B VIA SANTA MARIA N/S FAIRMONT BLVD 1,400 29 45,800 SLURRY SEAL $ - FY 2022-2023 ESPERANZA RD LINDSEY DR E/S PASEO DEL PRADO E/S 2,025 74 153,210 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD BOUNDARY FAIRMONT BLVD W/S 1,334 74 99,556 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD PASEO DEL PRADO E/S YORBA RANCH RD E/S 1,934 75 148,410 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD YORBA RANCH RD E/S VIA DEL CASADOR E/S 1,937 75 148,635 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD VIA DEL CASADOR E/S AVENIDA BARCELONA W/S 1,413 75 106,645 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD NEW RIVER E/S EAST SIDE CIRCLE E/S 600 74 44,400 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD EAST SIDE CIRCLE E/S HIDDEN HILLS ESTATES ENTR 880 34 35,020 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD AVENIDA BARCELONA W/S NEW RIVER E/S 1,412 75 106,570 Overlay - AC Thin $ - FY 2023-2024 ESPERANZA RD FAIRMONT BLVD W/S LINDSEY DR E/S 1,334 74 99,556 Overlay - AC Thin $ - FY 2023-2024 LAKEVIEW AVE MARIPOSA S/S PEPPERGROVE S/S 1,491 50 74,550 Overlay - AC Thin $ - FY 2023-2024 YORBA LINDA BLVD LAKEVIEW AVE W/S IMPERIAL HWY E/S 477 80 38,160 Overlay - AC Thin $ - FY 2023-2024 FAIRMONT BLVD FOREST S/S VILLAGE CENTER 1,735 60 104,100 SLURRY SEAL $ - FY 2023-2024 LA PALMA AVE CITY BOUNDARY 1000'' FROM BOUNDARY 1,000 86 86,000 SLURRY SEAL $ - FY 2023-2024 LA PALMA AVE 2000'' FROM BOUNDARY 3661'' FROM BOUNDARY 1,661 86 142,846 SLURRY SEAL $ - FY 2023-2024 LA PALMA AVE 1000'' FROM BOUNDARY 2000'' FROM BOUNDARY 1,000 86 86,000 SLURRY SEAL $ - FY 2023-2024 LA PALMA AVE E/B VIA LOMAS DE YORBA W E/S 1235'' S/O VIA LOMAS DE YORBA 1,235 86 106,210 SLURRY SEAL $ - FY 2023-2024 LA PALMA AVE E/B YLBP ENTRANCE E/B 928'' S/O YLBP ENTRANCE 928 86 79,808 SLURRY SEAL $ - FY 2023-2024 LA PALMA AVE E/B 1235'' S/O VIA LOMAS DE YORBA YL BP ENTRANCE W/S 1,235 86 106,210 SLURRY SEAL $ - FY 2023-2024 VILLAGE CENTER DR N/B YORBA LINDA BLVD N/S VIA ESPANA N/S 1,770 29 56,930 SLURRY SEAL $ - FY 2023-2024 VILLAGE CENTER DR N/B VIA ESPANA N/S MANZANITA S/S 1,437 24 37,288 SLURRY SEAL $ - FY 2023-2024 VILLAGE CENTER DR N/B MANZANITA S/S FAIRMONT S/S 2,053 23 52,819 SLURRY SEAL $ - FY 2023-2024 VILLAGE CENTER DR S/B FAIRMONT BLVD S/B MANZANITA S/S 2,053 23 55,619 SLURRY SEAL $ - FY 2023-2024 VILLAGE CENTER DR S/B MANZANITA S/S ESPANA S/S 1,437 24 37,288 SLURRY SEAL $ - FY 2023-2024 VILLAGE CENTER DR S/B ESPANA N/S YORBA LINDA BLVD 1,770 29 59,730 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD AVENIDA ADOBE N/S BRIDGE AT ESPERANZA 1,900 32 64,100 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD BRIDGE AT ESPERANZA AVENIDA ADOBE N/S 1,900 32 60,800 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD VIA DEL ESCUELA W/S AVENIDA ADOBE W/S 2,410 32 81,610 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD AVENIDA ADOBE N/S VIA DEL ESCUELA N/S 2,410 32 83,340 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD YORBA RANCH W/S VIA DEL ESCUELA W/S 1,872 32 62,324 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD VIA DEL ESCUELA N/S YORBA RANCH N/S 1,872 32 62,774 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD PASEO DE LAS PALOMAS E/S YORBA RANCH W/S 1,490 32 53,720 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD YORBA RANCH N/S PASEO DE LAS PALOMAS S/S 1,490 32 52,750 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD VILLAGE CENTER DR E/S PASEO DE LAS PALOMAS E/S 2,582 32 92,044 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD PASEO DE LAS PALOMAS W/S VILLAGE CENTER DR W/S 2,582 32 90,224 SLURRY SEAL $ - FY 2023-2024 YORBA LINDA BLVD ROSE DR W/S (City Limit) LINDA VISTA (City Limit) 726 64 54,368 SLURRY SEAL $ - FY 2023-2024 Limits of Work
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding MPAH
Sorted by Year of Treatment
MPAH
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
LA PALMA AVE E/B VIA LOMAS DE YORBA W/S CORBIT PLACE W/S 1,294 86 118,483 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 71,196.00 FY 2024-2025 LA PALMA AVE E/B CORBIT PLACE W/S GYPSUM CYN W/S 1,446 86 131,555 2 in Overlay + 2% BR $ 276,675.00 FY 2024-2025 LA PALMA AVE GYPSUM CYN W/S CAMINO DE BRYANT TO SANCT 1,612 64 103,168 2 in Overlay+10% Localized Inlay+5% BR $ 378,155.00 FY 2024-2025 BASTANCHURY RD VALLEY VIEW AVE E/S IMPERIAL HWY W/S 948 72 70,415 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 44,005.00 FY 2025-2026 ROSE DR PROMENADE AVE NORTH CITY LIMIT 1,150 22 25,300 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 15,811.00 FY 2025-2026 LAKEVIEW AVE VALLEY VIEW DUMMURRY LN 2,421 50 121,050 2 in Overlay + 2% BR $ 264,765.00 FY 2025-2026 BASTANCHURY RD PROSPECT AVE W/S ROSE DR E/S 1,282 60 76,920 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 91,332.00 FY 2025-2026 VALLEY VIEW AVE S/B MARDA AVE S/S BASTANCHURY RD S/S 935 26 24,310 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 28,865.00 FY 2025-2026 BASTANCHURY RD IMPERIAL HWY W/S OSMOND E/S 630 60 37,800 2 in Overlay+10% Localized Inlay+5% BR $ 144,096.00 FY 2025-2026 IMPERIAL HIGHWAY (HWY 90) BASTANCHURY RD VALLEY VIEW AVE 945 105 99,200 2 in Overlay+10% Localized Inlay+5% BR $ 378,155.00 FY 2025-2026 IMPERIAL HIGHWAY (HWY 90) 1068'' S/O PROSPECT AVE BASTANCHURY RD 1,068 101 106,496 2 in Overlay+10% Localized Inlay+5% BR $ 405,967.00 FY 2025-2026 LAKEVIEW AVE DUMMURRY LN HOGAN DR 2,254 50 112,700 2 in Overlay+10% Localized Inlay+5% BR $ 429,617.00 FY 2025-2026 LAKEVIEW AVE HOGAN DR BASTANCHURY RD 2,078 50 103,900 2 in Overlay+10% Localized Inlay+5% BR $ 396,071.00 FY 2025-2026 ROSE DR WABASH AVE S/S PROMENADE AVE N/S 695 60 41,700 2 in Overlay+10% Localized Inlay+5% BR $ 158,963.00 FY 2025-2026 ROSE DR 600'' S/o WABASH (City Limit) WABASH AVE 612 80 48,960 2 in Overlay+10% Localized Inlay+5% BR $ 186,638.00 FY 2025-2026 ROSE DR OAKHURST CIR N/S VERNA LN S/S 1,198 80 91,647 2 in Overlay+10% Localized Inlay+5% BR $ 349,362.00 FY 2025-2026 VALLEY VIEW AVE IMPERIAL HWY S/S ORANGE N/S 2,115 60 126,900 2 in Overlay+10% Localized Inlay+5% BR $ 483,748.00 FY 2025-2026 VALLEY VIEW AVE BASTANCHURY S/S IMPERIAL N/S 370 60 22,200 2 in Overlay+10% Localized Inlay+5% BR $ 84,628.00 FY 2025-2026 VALLEY VIEW AVE N/B BASTANCHURY RD S/S MARDA AVE S/S 935 26 24,310 2 in Overlay+10% Localized Inlay+5% BR $ 92,671.00 FY 2025-2026 VALLEY VIEW AVE N/B MARDA AVE S/S LAKEVIEW AVE S/S 1,160 26 30,160 2 in Overlay+10% Localized Inlay+5% BR $ 114,972.00 FY 2025-2026 VALLEY VIEW AVE S/B LAKEVIEW AVE S/S MARDA AVE S/S 1,160 26 30,160 2 in Overlay+10% Localized Inlay+5% BR $ 114,972.00 FY 2025-2026 BASTANCHURY RD LAKEVIEW AVE E/S EUREKA E/S 2,598 57 148,086 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 96,245.00 FY 2026-2027 BASTANCHURY RD LAKEVIEW AVE E/S HUMBOLDT LN E/S 1,705 61 91,005 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 59,147.00 FY 2026-2027 BASTANCHURY RD HUMBOLDT LANE E/S CLYDESDALE DR W/S 2,393 61 132,973 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 164,202.00 FY 2026-2027 FAIRMONT BLVD N/B LORCA N/S CAMROSA N/S 1,525 32 54,000 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 66,682.00 FY 2026-2027 LAKEVIEW AVE YORBA LINDA N/S LEMON DR 1,029 60 79,740 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 98,467.00 FY 2026-2027 LAKEVIEW AVE 120 N OF SH 600FT S/O S H 720 30 21,600 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 26,673.00 FY 2026-2027 BASTANCHURY RD CLYDESDALE DR W/S 2571'' W/O FAIRMONT BLVD 1,457 61 78,427 2 in Overlay+10% Localized Inlay+5% BR $ 310,926.00 FY 2026-2027 BASTANCHURY RD 2571'' W/O FAIRMONT BLVD FAIRMONT BLVD W/S 2,571 61 156,831 2 in Overlay+10% Localized Inlay+5% BR $ 621,760.00 FY 2026-2027 FAIRMONT BLVD S/B EDUCATION CTR NORTH ENT EDUCATION CTR SO ENTRANCE 684 32 21,888 2 in Overlay+10% Localized Inlay+5% BR $ 86,776.00 FY 2026-2027 FAIRMONT BLVD QUARTER HORSE DR N/S FOREST S/S 2,125 62 131,686 2 in Overlay+10% Localized Inlay+5% BR $ 522,072.00 FY 2026-2027 FAIRMONT BLVD YORBA EDUC. CENTER QUARTER HORSE DR N/S 1,945 62 120,590 2 in Overlay+10% Localized Inlay+5% BR $ 478,082.00 FY 2026-2027 IMPERIAL HIGHWAY (HWY 90) CASA LOMA AVE EUREKA DRIVE 1,490 98 136,290 2 in Overlay+10% Localized Inlay+5% BR $ 540,325.00 FY 2026-2027 LAKEVIEW AVE 120 N OF SH 600FT S/O SH SB 720 30 21,600 2 in Overlay+10% Localized Inlay+5% BR $ 85,634.00 FY 2026-2027 IMPERIAL HIGHWAY (HWY 90) 1311'' S/O LAKEVIEW AVE BUENA VISTA AVE 1,310 79 104,280 2 in Overlay + 2% BR $ 246,697.00 FY 2027-2028 YORBA LINDA BLVD EUREKA AVE E/S IMPERIAL HWY W/S 2,041 32 68,802 2 in Overlay + 2% BR $ 162,766.00 FY 2027-2028 YORBA LINDA BLVD CASA LOMA AVE W/S EUREKA AVE W/S 1,283 32 48,256 2 in Overlay + 2% BR $ 114,160.00 FY 2027-2028 YORBA LINDA BLVD EUREKA AVE E/S CASA LOMA AVE E/S 1,280 32 40,960 2 in Overlay + 2% BR $ 96,900.00 FY 2027-2028 RICHFIELD RD WILLOW CIRCLE ORCHARD DR 1,165 60 88,200 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 113,271.00 FY 2027-2028 IMPERIAL HIGHWAY (HWY 90) LAKEVIEW AVE 1311'' S/O LAKEVIEW AVE 1,311 79 104,358 2 in Overlay+10% Localized Inlay+5% BR $ 430,279.00 FY 2027-2028 IMPERIAL HIGHWAY (HWY 90) BUENA VISTA AVE 1468'' S/O BUENA VISTA AVE 1,468 79 119,303 2 in Overlay+10% Localized Inlay+5% BR $ 491,899.00 FY 2027-2028 IMPERIAL HIGHWAY (HWY 90) 1468'' S/O BUENA VISTA AVE KELLOGG DR 1,468 79 119,303 2 in Overlay+10% Localized Inlay+5% BR $ 491,899.00 FY 2027-2028 LAKEVIEW AVE PEPPERGROVE S/S 120'' N/O BUENA VISTA 1,689 60 106,956 2 in Overlay+10% Localized Inlay+5% BR $ 440,991.00 FY 2027-2028 RICHFIELD RD BUENA VISTA AVE WILLOW CIRCLE 2,326 60 139,560 2 in Overlay+10% Localized Inlay+5% BR $ 575,421.00 FY 2027-2028 RICHFIELD RD ROCK ROSE N/S BUENA VISTA S/S 1,080 60 64,800 2 in Overlay+10% Localized Inlay+5% BR $ 267,177.00 FY 2027-2028 RICHFIELD RD YORBA LINDA S/S ROCK ROSE N/S 1,881 60 112,860 2 in Overlay+10% Localized Inlay+5% BR $ 465,334.00 FY 2027-2028 YORBA LINDA BLVD IMPERIAL HWY W/S EUREKA AVE E/S 1,893 32 60,576 2 in Overlay+10% Localized Inlay+5% BR $ 249,761.00 FY 2027-2028 YORBA LINDA BLVD CASA LOMA AVE W/S VALLEY VIEW AVE E/S 1,263 80 101,040 2 in Overlay+10% Localized Inlay+5% BR $ 416,599.00 FY 2027-2028
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding MPAH
Sorted by Year of Treatment
MPAH
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
YORBA LINDA BLVD VAN BUREN E/S TORIDA WAY W/S 978 80 78,860 2 in Overlay+10% Localized Inlay+5% BR $ 325,148.00 FY 2027-2028 YORBA LINDA BLVD TORIDA WAY W/S PROSPECT AVE E/S (CITY LIMITS) 978 80 78,860 2 in Overlay+10% Localized Inlay+5% BR $ 325,148.00 FY 2027-2028 FAIRMONT BLVD S/B PASEO DE LAS PALOMAS GLENHAVEN S/S 1,635 24 47,624 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 33,478.00 FY 2028-2029 FAIRMONT BLVD S/B GLENHAVEN S/S NOB HILL DR N/S 1,695 32 56,240 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 39,535.00 FY 2028-2029 FAIRMONT BLVD S/B FAIRMONT CONNECTOR NOB HILL 1,600 50 84,000 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 59,049.00 FY 2028-2029 FAIRMONT BLVD N/B FAIRMONT CONNECTOR VILLAGE CENTER S/S 1,620 40 72,000 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 50,613.00 FY 2028-2029 FAIRMONT BLVD N/B VILLAGE CENTER S/S BIG SPRING N/S 2,413 32 84,816 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 59,622.00 FY 2028-2029 FAIRMONT BLVD N/B BIG SPRING N/S PASEO DE LAS PALOMAS S/S 1,042 32 35,944 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 25,268.00 FY 2028-2029 FAIRMONT CONNECTOR ESPERANZA RD FAIRMONT BLVD 785 84 65,940 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 46,353.00 FY 2028-2029 KELLOGG DR YORBA LINDA BLVD S/S SHADOW HILL N/S (City Limit) 1,260 50 63,000 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 44,287.00 FY 2028-2029 KELLOGG DR CITY LIMITS MOUNTAIN VIEW S/S 555 50 28,716 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 20,187.00 FY 2028-2029 KELLOGG DR MOUNTAIN VIEW S/S GRANDVIEW AVE 2,217 50 110,850 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 77,923.00 FY 2028-2029 KELLOGG DR GRANDVIEW AVE N/S IMPERIAL HWY N/S 262 50 13,100 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 9,209.00 FY 2028-2029 YORBA LINDA BLVD KELLOGG DR E/S BEG OF ISLAND PRESCHOOL 2,528 40 101,120 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 71,083.00 FY 2028-2029 YORBA LINDA BLVD BEG MEDIAN ISLAND KELLOGG DR E/S 2,528 40 101,120 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 71,083.00 FY 2028-2029 YORBA LINDA BLVD OHIO ST E/S KELLOGG DR W/S 2,100 32 72,400 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 50,894.00 FY 2028-2029 YORBA LINDA BLVD KELLOGG DR E/S OHIO ST E/S 2,045 40 87,000 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 61,158.00 FY 2028-2029 FAIRMONT BLVD PASEO DE LAS PALOMAS S/S OAK MEADOW N/S 1,182 59 61,158 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 81,684.00 FY 2028-2029 FAIRMONT BLVD OAK MEADOW N/S NOVA S/S 2,123 59 125,257 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 167,296.00 FY 2028-2029 FAIRMONT BLVD NOVA S/S YORBA LINDA BLVD S/S 823 60 49,380 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 65,953.00 FY 2028-2029 IMPERIAL HIGHWAY (HWY 90) 1519'' S/O KELLOG DR CITY LIMITS 1,519 72 113,003 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 150,929.00 FY 2028-2029 IMPERIAL HIGHWAY (HWY 90) WESTBOUND OFF-RAMP (On to Kellogg) 978 26 26,189 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 34,979.00 FY 2028-2029 IMPERIAL HIGHWAY (HWY 90) EASTBOUND ON-RAMP (From Kellogg) 997 26 28,772 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 38,429.00 FY 2028-2029 IMPERIAL HIGHWAY (HWY 90) EASTBOUND OFF RAMP (On to Kellogg) 928 26 27,879 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 37,236.00 FY 2028-2029 IMPERIAL HIGHWAY (HWY 90) WESTBOUND ON-RAMP (From Kellogg) 922 26 27,771 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 37,092.00 FY 2028-2029 YORBA LINDA BLVD BEG OF ISLAND VILLAGE CENTER E/S 3,220 32 110,840 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 148,040.00 FY 2028-2029 YORBA LINDA BLVD AVE NIDA RIO DEL ORO E/S END OF ISLAND 1,068 32 34,176 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 45,646.00 FY 2028-2029 YORBA LINDA BLVD VILLAGE CENTER DR W/S AVENIDA RIO DEL ORO E/S 2,229 29 67,241 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 89,809.00 FY 2028-2029 IMPERIAL HIGHWAY (HWY 90) KELLOGG DR 1519'' S/O KELLOG DR 1,519 72 113,003 2 in Overlay+10% Localized Inlay+5% BR $ 484,560.00 FY 2028-2029
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment AVENIDA DE LAS ESTRELLAS CAMINO DE LOS CANTOS YORBA LINDA BLVD 581 37 21,497 Overlay - AC Thin $ - FY 2022-2023 AVENIDA ADOBE AVENIDA ANTIGUA YORBA LINDA BLVD. 870 37 32,190 Overlay - AC Thin $ - FY 2022-2023 AVENIDA BARCELONA ESPERANZA ROAD END CDS 770 33 25,410 Overlay - AC Thin $ - FY 2022-2023 AVENIDA DE AMOR PASEO DE LAS PALOMAS END CDS 760 33 29,381 Overlay - AC Thin $ - FY 2022-2023 AVENIDA GRANADA CALLE ENTRADA AVENIDA BARCELONA 600 33 19,800 Overlay - AC Thin $ - FY 2022-2023 VIA AZAFRAN PASEO DE LAS PALOMAS VIA MARWAH 1,390 48 63,720 Overlay - AC Thin $ - FY 2022-2023 BEGONIA DR YORBA RANCH RD JACARANDA LN 492 33 16,236 Overlay - AC Thin $ - FY 2022-2023 VIA BELLEZA VIA AZAFRAN END CDS 188 33 10,505 Overlay - AC Thin $ - FY 2022-2023 CALLE ALCAZAR AVENIDA FLORENCIA END CDS 110 33 3,630 Overlay - AC Thin $ - FY 2022-2023 CALLE CUERVO AVENIDA GRANADA END CDS 300 33 9,900 Overlay - AC Thin $ - FY 2022-2023 CALLE DELGADO AVENIDA BARCELONA AVENIDA ANTIGUA 755 33 24,915 Overlay - AC Thin $ - FY 2022-2023 CALLE ENTRADA ESPERANZA ROAD END CDS 680 33 22,440 Overlay - AC Thin $ - FY 2022-2023 CALLE SONORA VIA MARIPOSA AVENIDA ADOBE 1,300 33 42,900 Overlay - AC Thin $ - FY 2022-2023 CALLE VISTA LINDA N END CDS S END CDS 700 33 31,702 Overlay - AC Thin $ - FY 2022-2023 CALLE VISTA ALEGRE PASEO DE LA CUMBRE END CDS 800 34 31,501 Overlay - AC Thin $ - FY 2022-2023 CARLOS ROAD PASEO SERRA YORBA RANCH RD. 1,180 33 38,940 Overlay - AC Thin $ - FY 2022-2023 VIA CADIZ W/S VIA SANTANDER VIA CARTAGENA 379 33 13,007 Overlay - AC Thin $ - FY 2022-2023 CIRCULO DURANGO PASEO TORTUGA END CDS 135 33 4,455 Overlay - AC Thin $ - FY 2022-2023 CIRCULO BAJO PASEO PANORAMA END CDS 160 33 5,280 Overlay - AC Thin $ - FY 2022-2023 CALLE DE LA LADERA PASEO DE LA RAMBLA END CDS 451 33 19,184 Overlay - AC Thin $ - FY 2022-2023 CALLE FELIZ AVE DE LAS ESTRELLAS END CDS 100 33 7,601 Overlay - AC Thin $ - FY 2022-2023 CIRCULO DEL SOL PASEO DE LA RAMBLA END CDS 190 33 10,571 Overlay - AC Thin $ - FY 2022-2023 VIA CARTAGENA VIA CADIZ VIA CRISTAL 476 33 15,708 Overlay - AC Thin $ - FY 2022-2023 VIA DEL CONEJO VIA DEL CAZADOR VIA DEL COYOTE 750 34 25,500 Overlay - AC Thin $ - FY 2022-2023 DOMINGUEZ RANCH ROAD TRAILSIDE DRIVE YORBA RANCH ROAD 3,940 34 133,960 Overlay - AC Thin $ - FY 2022-2023 AVENIDA EL CID PASEO DE LAS PALOMAS VIA AUGUSTO 1,983 33 67,439 Overlay - AC Thin $ - FY 2022-2023 GLOXINIA DR N/S JACARANDA LN END CDS 595 33 23,936 Overlay - AC Thin $ - FY 2022-2023 GLOXINIA DR S/S JACARANDA LN BEGONIA DR 870 33 28,710 Overlay - AC Thin $ - FY 2022-2023 GRANADA DR SIENNA LN LOMBARDY LN 700 36 25,700 Overlay - AC Thin $ - FY 2022-2023 IVY CIRCLE GLOXINIA DR END CDS 118 33 8,195 Overlay - AC Thin $ - FY 2022-2023 JOANNE WAY CALLE SONORA END CDS 150 33 4,950 Overlay - AC Thin $ - FY 2022-2023 VIA LA GRANJA VIA DEL PALMAR END CDS 340 33 15,521 Overlay - AC Thin $ - FY 2022-2023 LOMBARDY LN GRANADA ORLANDO DR 650 36 23,400 Overlay - AC Thin $ - FY 2022-2023 MAJORCA LN ORLANDO DR END CDS 380 33 16,841 Overlay - AC Thin $ - FY 2022-2023 MAPLE CIRCLE GLOXINIA DR END CDS 82 33 7,007 Overlay - AC Thin $ - FY 2022-2023 PABLO ROAD DOMINGUEZ RANCH RD N END CDS 575 33 18,975 Overlay - AC Thin $ - FY 2022-2023 PASEO DE LA RAMBLA PASEO DE LA CUMBRE PASEO DEL PRADO 2,015 34 68,510 Overlay - AC Thin $ - FY 2022-2023 PASEO DE LA RAMBLA PASEO DEL PRADO CALLE VISTA LINDA 185 34 6,290 Overlay - AC Thin $ - FY 2022-2023 PASEO CALIENTE PASEO SERRA PASEO TORTUGA 380 33 12,540 Overlay - AC Thin $ - FY 2022-2023 PASEO PANORAMA PASEO DEL PRADO PASEO ALTO 1,910 33 63,030 Overlay - AC Thin $ - FY 2022-2023 PASEO RICO CARLOS ROAD VIA CORONADO 645 33 21,285 Overlay - AC Thin $ - FY 2022-2023 PASEO SERRA CARLOS ROAD PASEO CALIENTE 400 33 13,200 Overlay - AC Thin $ - FY 2022-2023 PASEO TORTUGA PASEO CALIENTE TRAIL SIDE DRIVE 770 33 29,711 Overlay - AC Thin $ - FY 2022-2023 PASEO DE LA CUMBRE YORBA RANCH RD PASEO DEL PRADO 2,371 37 87,727 Overlay - AC Thin $ - FY 2022-2023 RAMONA ROAD DOMINGUEZ RANCH RD N DOMINGUEZ RANCH RD S 2,000 33 66,000 Overlay - AC Thin $ - FY 2022-2023 SIENNA LN ORLANDO DR GRANADA DR 668 36 24,548 Overlay - AC Thin $ - FY 2022-2023 VIA SANTANDER VIA SONADOR PASEO DE LAS PALOMAS 888 40 35,520 Overlay - AC Thin $ - FY 2022-2023 VIA SEVILLA VIA BELARMINO END CDS 211 33 11,264 Overlay - AC Thin $ - FY 2022-2023 Limits of Work
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
TRAVIS ROAD PASEO DEO PRADO END 200 33 6,600 Overlay - AC Thin $ - FY 2022-2023 TRAILSIDE DRIVE DOMINGUEZ RANCH ROAD YORBA RANCH ROAD 770 33 25,410 Overlay - AC Thin $ - FY 2022-2023 TRAILSIDE DRIVE YORBA RANCH ROAD VIA PERLA 550 33 18,150 Overlay - AC Thin $ - FY 2022-2023 TULIP CIR GLOXINIA DR END CDS 101 33 3,333 Overlay - AC Thin $ - FY 2022-2023 VIA ALVARADO DOMINGUEZ RANCH ROAD N N END CDS 70 33 2,310 Overlay - AC Thin $ - FY 2022-2023 VIA CORONADO PASEO RICO END CDS 320 33 10,560 Overlay - AC Thin $ - FY 2022-2023 VIA ALISA DOMINGUEZ RANCH ROAD W END CDS 325 33 10,725 Overlay - AC Thin $ - FY 2022-2023 VIA ALVARADO DOMINGUEZ RANCH ROAD S END CDS 305 33 10,065 Overlay - AC Thin $ - FY 2022-2023 VIA ASTURIAS VIA CERVANTES VIA BELARMINO 367 33 12,611 Overlay - AC Thin $ - FY 2022-2023 VIA BERNARDO CIRCLE VIA BERNARDO ROAD E END CDS 35 33 1,155 Overlay - AC Thin $ - FY 2022-2023 VIA BERNARDO DOMINGUEZ RANCH RD W N END CDS 615 33 20,295 Overlay - AC Thin $ - FY 2022-2023 VIA BELARMINO VIA ASTURIAS AVENIDA EL CID 776 33 25,608 Overlay - AC Thin $ - FY 2022-2023 VIA BREVE AVE DE AMOR VISTA DEL AMIGO 419 33 13,827 Overlay - AC Thin $ - FY 2022-2023 VIA CAMPANAS VIA AZAFRAN END CDS 263 33 12,980 Overlay - AC Thin $ - FY 2022-2023 VIA COTA DOMINGUEZ RANCH ROAD W END CDS 100 33 3,300 Overlay - AC Thin $ - FY 2022-2023 VIA CARRETAS VIA AZAFRAN END CDS 314 33 14,663 Overlay - AC Thin $ - FY 2022-2023 VIA CRISTAL VILLAGE CENTER DR END CDS 412 33 17,897 Overlay - AC Thin $ - FY 2022-2023 VIA CASTELLON VIA CARTAGENA END CDS 161 33 9,614 Overlay - AC Thin $ - FY 2022-2023 VIA DE LA ARDILLA VIA DEL GAVILLAN VIA DEL VENADO 230 30 6,900 Overlay - AC Thin $ - FY 2022-2023 VIA DEL ACERO VIA DE LA ESCUELA N END CDS 225 33 7,425 Overlay - AC Thin $ - FY 2022-2023 VIA DE LA ESCUELA DOMINGUEZ RANCH ROAD YORBA LINDA BLVD. 880 34 29,920 Overlay - AC Thin $ - FY 2022-2023 VIA DEL AGUILA VIA DEL COYOTE END CDS 230 33 7,590 Overlay - AC Thin $ - FY 2022-2023 VIA DEL BISONTE VIA DEL CAZADOR VIA DEL COYOTE 930 34 31,620 Overlay - AC Thin $ - FY 2022-2023 VIA DEL COYOTE VIA DEL BISONTE VIA DEL CUERVO 1,200 34 40,800 Overlay - AC Thin $ - FY 2022-2023 VIA DEL CUERVO VIA DEL COYOTE END CDS 340 33 11,220 Overlay - AC Thin $ - FY 2022-2023 VIA DEL FIERRO VIA DE LA ESCUELA N END CDS 500 33 16,500 Overlay - AC Thin $ - FY 2022-2023 VIA DEL GAVILAN VIA DEL CONEJO VIA DEL BISONTE 435 33 14,355 Overlay - AC Thin $ - FY 2022-2023 VIA DEL HALCON VIA DEL COYOTE END CDS 320 33 10,560 Overlay - AC Thin $ - FY 2022-2023 VIA DEL POTRERO VIA DEL VENADO END CDS 380 33 12,540 Overlay - AC Thin $ - FY 2022-2023 VIA DEL TECOLOTE VIA DEL BASONTE END CDS 300 33 9,900 Overlay - AC Thin $ - FY 2022-2023 VIA DIANZA DOMINGUEZ RANCH RD VIA ONTIVEROS 585 33 19,305 Overlay - AC Thin $ - FY 2022-2023 VIA DULCINEA VIA MARWAH END CDS 152 33 9,317 Overlay - AC Thin $ - FY 2022-2023 VIA ESTE PABLO ROAD E END CDS 220 33 7,260 Overlay - AC Thin $ - FY 2022-2023 VIA ESTANCIA VIA FRANCISCO END CDS 254 33 12,683 Overlay - AC Thin $ - FY 2022-2023 VIA FRANCISCO VIA DIEGO VIA ESTANCIA 280 33 9,240 Overlay - AC Thin $ - FY 2022-2023 VIA INGRESO PONTO DE VISTA PASEO DE LAS PALOMAS 740 33 25,920 Overlay - AC Thin $ - FY 2022-2023 VIA LUGO DOMINGUEZ RANCH ROAD W END CDS 170 33 5,610 Overlay - AC Thin $ - FY 2022-2023 VIA MARCOS CARLOS ROAD END CDS 685 33 26,906 Overlay - AC Thin $ - FY 2022-2023 VIA MARIPOSA AVENIDA ANTIGUA END CDS 2,300 34 78,200 Overlay - AC Thin $ - FY 2022-2023 VIA NORIEGA DOMINGUEZ RANCH ROAD W END CDS 450 33 14,850 Overlay - AC Thin $ - FY 2022-2023 VIA OESTE PABLO ROAD W END CDS 170 33 5,610 Overlay - AC Thin $ - FY 2022-2023 VIA ONTIVEROS VIA SEPULVEDA S END CDS 460 33 15,180 Overlay - AC Thin $ - FY 2022-2023 VIA ROBLE AVENIDA ANTIGUA CALLE ENTRADA 220 33 7,260 Overlay - AC Thin $ - FY 2022-2023 VIA ROSA DOMINGUEZ RANCH ROAD N END CDS 90 33 2,970 Overlay - AC Thin $ - FY 2022-2023 VIA SEPULVEDA YORBA RANCH ROAD S END CDS 630 33 20,790 Overlay - AC Thin $ - FY 2022-2023 VIA SONRISA PASEO DE LAS PALOMAS AVENIDA DE LOS REYES 463 33 15,279 Overlay - AC Thin $ - FY 2022-2023 VIA VICENTE W END CDS E END CDS 600 33 28,402 Overlay - AC Thin $ - FY 2022-2023 VIA VICENTE YORBA RANCH ROAD VIA VICENTE 220 33 7,260 Overlay - AC Thin $ - FY 2022-2023
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
VIA VENTOSA CAMINO DE LOS CANTOS END CDS 333 33 15,290 Overlay - AC Thin $ - FY 2022-2023 VIA VENTANA AVENIDA DE LOS REYES END CDS 301 33 14,734 Overlay - AC Thin $ - FY 2022-2023 VIA ZOPAPO BALARMINO END CDS 229 33 11,858 Overlay - AC Thin $ - FY 2022-2023 VENECIA LN ORLANDO DR END CDS 408 33 17,765 Overlay - AC Thin $ - FY 2022-2023 ADAMS CIRCLE JUSTIN WAY END CDS 200 33 6,600 SLURRY SEAL $ - FY 2022-2023 ANDREA CIR VIA MARWAH END CDS 172 27 8,945 SLURRY SEAL $ - FY 2022-2023 ANNA CIRCLE SOUTHVIEW END CDS 151 27 8,378 SLURRY SEAL $ - FY 2022-2023 VIA BILBAO AVENIDA EL CID END CDS 167 33 9,812 SLURRY SEAL $ - FY 2022-2023 BRITTANY WAY VILLAGE CENTER DRIVE CHANDLER DRIVE 125 30 3,750 SLURRY SEAL $ - FY 2022-2023 VIA CADIZ E/S VIA SANTANDER END CDS 116 33 8,129 SLURRY SEAL $ - FY 2022-2023 CHANDLER DRIVE KLINE LANE GALLAL WAY 890 33 29,370 SLURRY SEAL $ - FY 2022-2023 CHANNING LN E/S LINDSEY DR END CDS 993 33 37,455 SLURRY SEAL $ - FY 2022-2023 CHANNING LN W/S LINDSEY DR END CDS 768 33 29,880 SLURRY SEAL $ - FY 2022-2023 CIRCULO LOMA PASEO DEL PRADO END CDS 110 34 3,740 SLURRY SEAL $ - FY 2022-2023 CIRCULO NUEVO VIA MARIPOSA END CDS 20 33 660 SLURRY SEAL $ - FY 2022-2023 CIRCULO VISTA PASEO DEL PRADO END CDS 200 34 6,800 SLURRY SEAL $ - FY 2022-2023 VIA CALDERON VIA SANTANDER END CDS 216 33 11,429 SLURRY SEAL $ - FY 2022-2023 CALLE BELLA E/S PASE DEL PRADO END CDS 350 33 15,851 SLURRY SEAL $ - FY 2022-2023 CALLE BELLA W/S PASEO DEL PRADO END CDS 104 33 7,733 SLURRY SEAL $ - FY 2022-2023 CALLE MANZANA CALLE TRANQUILLO CAMINO DE LOS CANTOS 267 33 9,311 SLURRY SEAL $ - FY 2022-2023 CALLE PERA PASEO DE LAS PALOMAS END CDS 337 33 15,922 SLURRY SEAL $ - FY 2022-2023 CALLE TRANQUILLO AVENIDA DE LOS REYES END CDS 590 33 23,771 SLURRY SEAL $ - FY 2022-2023 CAMINO DE LOS CANTOS CALLE MANZANA VIA VENTOSA 500 33 17,000 SLURRY SEAL $ - FY 2022-2023 VIA CARTAGENA VIA CRISTAL END CDS 526 33 21,659 SLURRY SEAL $ - FY 2022-2023 COTTONWOOD RD E/S HICKORY END CDS 664 33 26,713 SLURRY SEAL $ - FY 2022-2023 COTTONWOOD RD W/S HICKORY END CDS 352 33 16,417 SLURRY SEAL $ - FY 2022-2023 AVENIDA DE LOS REYES VIA VENTANA END CDS 1,000 33 37,301 SLURRY SEAL $ - FY 2022-2023 VIA DEL PALMAR VIA BRUMOSA VIA MARWAH E/S 267 33 8,811 SLURRY SEAL $ - FY 2022-2023 VIA DEL PALMAR VIA MARWAH W/S VIA PRIMARIA 515 33 16,995 SLURRY SEAL $ - FY 2022-2023 DOMINGUEZ RANCH ROAD TRAILSIDE DRIVE ESPERANZA ROAD 2,300 34 78,200 SLURRY SEAL $ - FY 2022-2023 EAST HILL DR VILLAGE CENTER SOUTH VIEW DR 387 33 13,271 SLURRY SEAL $ - FY 2022-2023 GALLAL WAY CHANDLER DRIVE THAGARD WAY 785 33 25,905 SLURRY SEAL $ - FY 2022-2023 HICKORY DR ESPERANZA END CDS 374 33 14,723 SLURRY SEAL $ - FY 2022-2023 HANNAH CIR VIA MARWAH END CDS 221 27 10,268 SLURRY SEAL $ - FY 2022-2023 HERBSHEY CIR LINDSEY CIR END CDS 960 33 35,981 SLURRY SEAL $ - FY 2022-2023 JACARANDA LN BEGONIA DR YORBA RANCH RD 1,321 33 43,593 SLURRY SEAL $ - FY 2022-2023 JUSTIN WAY VIA MARWAH END CDS 412 33 14,096 SLURRY SEAL $ - FY 2022-2023 KLINE LANE CHANDLER DRIVE END CDS 765 25 19,125 SLURRY SEAL $ - FY 2022-2023 LANDIG CIRCLE GALLAL WAY END CDS 530 33 17,490 SLURRY SEAL $ - FY 2022-2023 LINDSEY DR ESPERANZA RD CHANNING LN 512 33 16,896 SLURRY SEAL $ - FY 2022-2023 LONGBAY DR END CDS END CDS 1,675 33 63,877 SLURRY SEAL $ - FY 2022-2023 PASEO ALTO PASEO DE LAS PALOMAS E END CDS 240 33 7,920 SLURRY SEAL $ - FY 2022-2023 PASEO DEL RETIRO PASEO DE LA CUMBRE S END CDS 1,250 30 37,500 SLURRY SEAL $ - FY 2022-2023 PINGREE WAY CHANNING LANE END CDS 821 33 31,894 SLURRY SEAL $ - FY 2022-2023 PASEO DE LAS PALOMAS E/B VILLAGE CENTER W/S PASEO DEL PARDO E/S 1,936 29 61,424 SLURRY SEAL $ - FY 2022-2023 PASEO DE LAS PALOMAS E/B PASEO DEL PARDO E/S YORBA LINDA BLVD W/S 2,927 25 83,575 SLURRY SEAL $ - FY 2022-2023 PASEO DE LAS PALOMAS W/B YORBA LINDA BLVD S/S INGRESO S/S 1,953 25 54,025 SLURRY SEAL $ - FY 2022-2023 PASEO DE LAS PALOMAS W/B INGRESO S/S VIA AZAFRAN S/S 1,949 29 61,961 SLURRY SEAL $ - FY 2022-2023
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
PASEO DE LAS PALOMAS W/B VIA AZAFRAN S/S VILLAGE CENTER N/S 921 29 29,309 SLURRY SEAL $ - FY 2022-2023 PASEO DEL PRADO PASEO DE LAS PALOMAS CIRCULO VISTA N/S 2,136 52 111,072 SLURRY SEAL $ - FY 2022-2023 PASEO DEL PRADO CIRCULO VISTA N/S ESPERANZA RD 2,310 52 120,120 SLURRY SEAL $ - FY 2022-2023 PUNTO DE VISTA VIA INGRESO VISTA DEL AMIGO 420 33 13,860 SLURRY SEAL $ - FY 2022-2023 SHAKARI DR LONG BAY END CDS 825 27 22,275 SLURRY SEAL $ - FY 2022-2023 SUNBURY CIRCLE SOUTHVIEW END CDS 152 27 8,405 SLURRY SEAL $ - FY 2022-2023 VIA SANTA MARIA VILLAGE CTR LONGBAY 150 33 4,950 SLURRY SEAL $ - FY 2022-2023 SOUTHVIEW DR EASTHILL DR END CDS 978 33 36,575 SLURRY SEAL $ - FY 2022-2023 THAGARD WAY GALLAL WAY E END CDS 1,100 26 28,600 SLURRY SEAL $ - FY 2022-2023 VIA AUGUSTO END CDS VIA CERVANTES 400 33 17,501 SLURRY SEAL $ - FY 2022-2023 VIA BRUMOSA VIA AZAFRAN VIA DEL PALMAR 1,092 33 37,036 SLURRY SEAL $ - FY 2022-2023 VIA CERVANTES S/S VIA AGUSTO AVENIDA EL CID 1,070 33 35,810 SLURRY SEAL $ - FY 2022-2023 VIA CASTILE VIA SANTANDER END CDS 300 33 14,201 SLURRY SEAL $ - FY 2022-2023 VIA DIEGO VIA TOLEDO END CDS 700 33 27,401 SLURRY SEAL $ - FY 2022-2023 VIA DEL CAZADOR ESPERANZA ROAD DOMINGUEZ RANCH ROAD 1,365 37 50,505 SLURRY SEAL $ - FY 2022-2023 VIA DEL PARQUE DOMINGUEZ RANCH ROAD S END CDS 1,630 34 55,420 SLURRY SEAL $ - FY 2022-2023 VIA DEL PUMA VIA DEL COYOTE END CDS 265 33 8,745 SLURRY SEAL $ - FY 2022-2023 VIA DIEGO CIRCLE VIA DIEGO END CDS 120 33 3,960 SLURRY SEAL $ - FY 2022-2023 VIA ESCOBA VIA MARWAH END CDS 163 33 9,680 SLURRY SEAL $ - FY 2022-2023 VIA JARDIN VISTA DEL AMIGO END CDS 337 33 15,422 SLURRY SEAL $ - FY 2022-2023 VIA MARWAH E/S VILLAGE CENTER DR VILLAGE CENTER DR 3,021 42 123,882 SLURRY SEAL $ - FY 2022-2023 VIA NIETOS YORBA RANCH END OF STREETS 1,185 33 40,705 SLURRY SEAL $ - FY 2022-2023 VIA NOPALES VIA MARWAH END CDS 128 33 8,525 SLURRY SEAL $ - FY 2022-2023 VIA PERLA TRAILSIDE DRIVE END CDS 310 33 14,531 SLURRY SEAL $ - FY 2022-2023 VIA PRIMARIA END CDS VIA MARWAH 1,496 33 53,669 SLURRY SEAL $ - FY 2022-2023 VIA SONADOR VIA CARTEGENA END CDS 822 33 31,427 SLURRY SEAL $ - FY 2022-2023 VIA SANTANA YORBA RANCH END OF STREETS 1,376 33 45,408 SLURRY SEAL $ - FY 2022-2023 VIA SUSANNAH AVENIDA EL CID END CDS 182 33 10,307 SLURRY SEAL $ - FY 2022-2023 VIA TOLEDO PASEO DE LAS PALOMAS VIA DIEGO 482 33 16,406 SLURRY SEAL $ - FY 2022-2023 VIA TAPASTE VIA MARWAH END CDS 224 33 11,693 SLURRY SEAL $ - FY 2022-2023 VISTA DEL AMIGO VIA JARDIN PUNTO DE VISTA 1,207 33 45,132 SLURRY SEAL $ - FY 2022-2023 YORBA RANCH N/B ESPERANZA ROAD S/S TRAIL SIDE S/S 2,292 25 67,500 SLURRY SEAL $ - FY 2022-2023 YORBA RANCH N/B TRAIL SIDE S/S CARLOS RD S/S 2,212 25 60,500 SLURRY SEAL $ - FY 2022-2023 YORBA RANCH N/B CARLOS RD S/S YORBA LINDA BLVD S/S 1,760 25 48,600 SLURRY SEAL $ - FY 2022-2023 YORBA RANCH S/B YORBA LINDA BLVD S/B VIA RAMON S/S 2,357 25 60,925 SLURRY SEAL $ - FY 2022-2023 YORBA RANCH S/B VIA RAMON S/S PASEO DE LAS CUMBRE S/S 1,982 25 56,800 SLURRY SEAL $ - FY 2022-2023 YORBA RANCH S/B PASEO DE LAS CUMBRE S/S ESPERANZA RD S/S 1,950 25 56,710 SLURRY SEAL $ - FY 2022-2023 AVENIDA ANTIGUA AVENIDA FLORENCIA END CDS 1,850 33 61,050 RECONSTRUCT STRUCTURE (AC) $ - FY 2022-2023 AVENIDA FLORENCIA CALLE DELGADO END CDS 870 33 28,710 RECONSTRUCT STRUCTURE (AC) $ - FY 2022-2023 VIA RAMON N/S END CDS END CDS 787 33 34,573 RECONSTRUCT STRUCTURE (AC) $ - FY 2022-2023 VIA RAMON E/S YORBA RANCH RD VIA RAMON 207 33 6,831 RECONSTRUCT STRUCTURE (AC) $ - FY 2022-2023 ALDER AVE SAN ANTONIO RD END CDS 957 37 39,710 Overlay - AC Thin $ - FY 2023-2024 ASPEN WAY SAN ANTONIO RD END OF STREET 355 33 11,715 Overlay - AC Thin $ - FY 2023-2024 AVENIDA DE LA LUZ VISTA DEL SOL END OF CDS 744 33 28,853 Overlay - AC Thin $ - FY 2023-2024 AVENIDA DE LOS SUENOS END OF CDS VIA ROJA 284 33 13,673 Overlay - AC Thin $ - FY 2023-2024 BEECH AVE MANZANITA AVE PEPPER AVE 1,674 27 45,198 Overlay - AC Thin $ - FY 2023-2024 BIRCH CIR SMOKETREE END CDS 250 27 11,051 Overlay - AC Thin $ - FY 2023-2024 BLACK PINE CIR FAIRMONT BL END CDS 169 33 9,878 Overlay - AC Thin $ - FY 2023-2024
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
CHAPARRAL RIDGE DR RIM CREST DR END CDS 322 33 14,927 Overlay - AC Thin $ - FY 2023-2024 CHARTER OAKS TERRACE FAIRMONT BLVD END CDS 228 33 11,825 Overlay - AC Thin $ - FY 2023-2024 CHATEAU AVE SINGINGWOOD DR END CDS 630 33 25,091 Overlay - AC Thin $ - FY 2023-2024 CALLE BONITA END OF CDS VIA ROJA 259 33 12,848 Overlay - AC Thin $ - FY 2023-2024 CAMPHOR E/S MANZANITA AVE END CDS 391 33 17,204 Overlay - AC Thin $ - FY 2023-2024 CAMPHOR W/S MANZANTIA AVE END CDS 925 33 34,826 Overlay - AC Thin $ - FY 2023-2024 CONDOR RIDGE RD FAIRMONT BLVD END CDS 1,211 33 44,764 Overlay - AC Thin $ - FY 2023-2024 CANYON TERRACE DR FAIRMONT BLVD END OF CDS 460 27 16,721 Overlay - AC Thin $ - FY 2023-2024 CASSIA LN PEPPER AVE END CDS 1,237 27 37,700 Overlay - AC Thin $ - FY 2023-2024 CASTLE ROCK RD TIMBERRIDGE RD END CDS 722 33 28,627 Overlay - AC Thin $ - FY 2023-2024 DEODAR DR VILLAGE CENTER DR END CDS 2,178 33 76,175 Overlay - AC Thin $ - FY 2023-2024 VIA DE LA MULA VIA DON QUIJOTE VIA DON JUAN 561 33 18,513 Overlay - AC Thin $ - FY 2023-2024 VIA DEL OBISPO VIA TRINIDAD END OF CDS 202 33 10,967 Overlay - AC Thin $ - FY 2023-2024 VIA DON JUAN VIA DE LA MULA VIA DEL BUEY 489 33 16,137 Overlay - AC Thin $ - FY 2023-2024 VIA DON QUIJOTE VIA DEL BUEY VIA DE LA MULA 377 33 12,941 Overlay - AC Thin $ - FY 2023-2024 DUNROBIN WAY STONEHAVEN DR END OF CDS 1,707 37 67,960 Overlay - AC Thin $ - FY 2023-2024 DORINDA RD END OF CDS FELIPA RD 1,597 33 57,502 Overlay - AC Thin $ - FY 2023-2024 DORINDA RD FELIPA RD YORBA LINDA BLVD 1,022 33 34,226 Overlay - AC Thin $ - FY 2023-2024 EAGLES NEST DR FAIRMONT BLVD END CDS 847 33 32,252 Overlay - AC Thin $ - FY 2023-2024 FALCONRIDGE RD RIM CREST DR END CDS 229 33 11,858 Overlay - AC Thin $ - FY 2023-2024 FELIPA RD DORINDA RD SAN ANTONIO RD 1,286 33 42,938 Overlay - AC Thin $ - FY 2023-2024 FIR CREST DR TAMMARISK DR PEBBLE BEACH LANE 230 33 8,090 Overlay - AC Thin $ - FY 2023-2024 FOREST AVE FAIRMONT BLVD END CDS 432 33 19,057 Overlay - AC Thin $ - FY 2023-2024 FAIRWOOD CIRLCE HIDDEN HILLS RD END OF CDS 520 33 21,461 Overlay - AC Thin $ - FY 2023-2024 FOX HOLLOW DR SHADOW OAK DR FAIRMONT BLVD 795 33 26,235 Overlay - AC Thin $ - FY 2023-2024 GREEN CREST E/S SKY RIDGE END OF CDS 1,173 26 34,799 Overlay - AC Thin $ - FY 2023-2024 GREEN CREST W/S SKY RIDGE HIDDEN HILLS 2,173 28 60,844 Overlay - AC Thin $ - FY 2023-2024 GREEN MOUNT PL HIDDEN HILLS END OF CDS 627 26 21,103 Overlay - AC Thin $ - FY 2023-2024 HIGH TREE CIR HIDDEN HILLS END OF CDS 639 26 20,915 Overlay - AC Thin $ - FY 2023-2024 JUNIPER AVE DEODAR DR END CDS 1,112 33 40,997 Overlay - AC Thin $ - FY 2023-2024 LITTLE CANYON LN FAIRMONT BLVD END CDS 406 31 16,887 Overlay - AC Thin $ - FY 2023-2024 LIVE OAK LN DEODAR DR END CDS 1,620 27 48,041 Overlay - AC Thin $ - FY 2023-2024 MAHOGANY CIR MANZANITA AVE END CDS 730 33 28,391 Overlay - AC Thin $ - FY 2023-2024 MANZANITA AVE PEPPER AVE VILLAGE CENTER DR 401 33 13,733 Overlay - AC Thin $ - FY 2023-2024 MANZANITA AVE VILLAGE CENTER DR SMOKETREE W/S 750 31 23,250 Overlay - AC Thin $ - FY 2023-2024 MANZANITA AVE SMOKETREE E/S END CDS 1,423 27 42,722 Overlay - AC Thin $ - FY 2023-2024 MIRKWOOD RUN LIVE OAK LN END CDS 846 27 27,143 Overlay - AC Thin $ - FY 2023-2024 MISSION HILLS LANE HIDDEN HILLS RD STARWOOD S/S 1,827 33 60,291 Overlay - AC Thin $ - FY 2023-2024 MISSION HILLS LANE STARWOOD S/S HIDDEN HILLS RD 669 33 22,077 Overlay - AC Thin $ - FY 2023-2024 PEPPER AVE. E/S LIVE OAK LN VILLAGE CENTER DR 250 27 6,750 Overlay - AC Thin $ - FY 2023-2024 PEPPER AVE. W/S VILLAGE CENTER DR END CDS 2,544 33 88,253 Overlay - AC Thin $ - FY 2023-2024 PINE CREST CIR FAIRMONT BLVD END CDS 506 33 20,999 Overlay - AC Thin $ - FY 2023-2024 POTOMAC AVE ROANOKE AVE GRANBY DR 813 27 21,951 Overlay - AC Thin $ - FY 2023-2024 QUAIL CIR FAIRMONT BLVD END CDS 254 33 12,683 Overlay - AC Thin $ - FY 2023-2024 RIDGE PARK DR SAN ANTONIO RD END CDS 1,651 37 65,388 Overlay - AC Thin $ - FY 2023-2024 RIM CREST DR FAIRMONT BLVD BLUE GUM 2,214 37 83,918 Overlay - AC Thin $ - FY 2023-2024 ROANOKE AVE AVENIDA ADOBE TODD AVE 840 35 29,400 Overlay - AC Thin $ - FY 2023-2024 RAINWOOD AVE PEPPER AVE PEPPER AVE 1,615 27 43,605 Overlay - AC Thin $ - FY 2023-2024
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
RAVENSWOOD DR FAIRMONT BLVD END CDS 735 33 28,556 Overlay - AC Thin $ - FY 2023-2024 SHADOW OAK DR FAIRMONT BLVD FOXHOLLOW DR 979 27 27,433 Overlay - AC Thin $ - FY 2023-2024 SHERWOOD DR RIM CREST END CDS 536 29 19,845 Overlay - AC Thin $ - FY 2023-2024 SKYRIDGE DR HIDDEN HILLS DR GREEN CREST 1,764 26 45,864 Overlay - AC Thin $ - FY 2023-2024 SMOKETREE AVE END CDS MANZANITA AVE 875 27 28,926 Overlay - AC Thin $ - FY 2023-2024 SMOKETREE AVE MANZANITA AVE JUNIPER AVE 972 33 32,076 Overlay - AC Thin $ - FY 2023-2024 SAN ANTONIO RD YORBA LINDA BLVD VIA CORZO 397 50 19,850 Overlay - AC Thin $ - FY 2023-2024 SAN ANTONIO RD VIA CORZO ALDER AVE 1,502 37 55,574 Overlay - AC Thin $ - FY 2023-2024 SAN ANTONIO RD ALDER AVE VIEW PARK DR 2,141 37 79,217 Overlay - AC Thin $ - FY 2023-2024 SAN ANTONIO RD VIEW PARK DR FAIRMONT BLVD 3,250 37 120,250 Overlay - AC Thin $ - FY 2023-2024 SUN BEAM RD HIDDEN HILLS RD END OF CDS 454 24 15,197 Overlay - AC Thin $ - FY 2023-2024 SINGINGWOOD DR FAIRMONT BLVD END CDS 753 33 24,849 Overlay - AC Thin $ - FY 2023-2024 SUNNY SIDE DR RIM CREST DR END CDS 537 29 19,874 Overlay - AC Thin $ - FY 2023-2024 STARLIGHT DR HIDDEN HILLS RD END OF CDS 200 33 10,901 Overlay - AC Thin $ - FY 2023-2024 STARWOOD DR MISSION HILLS LN END OF CDS 422 33 18,227 Overlay - AC Thin $ - FY 2023-2024 TIMBER RIDGE RD FAIRMONT BLVD END CDS 995 33 37,136 Overlay - AC Thin $ - FY 2023-2024 TRAIL RIDGE SAN ANTONIO RD END CDS 208 27 9,917 Overlay - AC Thin $ - FY 2023-2024 TWIN OAK SAN ANTONIO RD END CDS 905 33 34,166 Overlay - AC Thin $ - FY 2023-2024 VIA PEPITA VILLAGE CENTER DR END CDS 1,375 33 49,676 Overlay - AC Thin $ - FY 2023-2024 VIA RIVERA VIA DEL BUEY END OF CDS 126 36 8,837 Overlay - AC Thin $ - FY 2023-2024 VIA AMANTE VIA CONTENTO END CDS 462 33 19,547 Overlay - AC Thin $ - FY 2023-2024 VIA CONTENTO VIA CORZO VIA CASCO 758 33 25,514 Overlay - AC Thin $ - FY 2023-2024 VIA CORZO ALDER AVE SAN ANTONIO RD 1,788 37 66,156 Overlay - AC Thin $ - FY 2023-2024 VIA CASCO VIA PIEDRA END CDS 177 33 10,142 Overlay - AC Thin $ - FY 2023-2024 VIA CASCO VIA CONTENTO VIA PIEDRA 250 33 8,250 Overlay - AC Thin $ - FY 2023-2024 VIA DE LA ROCA VIA DE LA AGUA END CDS 100 31 7,401 Overlay - AC Thin $ - FY 2023-2024 VIA ESPANA VIA NAVARRA VILLAGE CENTER DR 250 36 9,000 Overlay - AC Thin $ - FY 2023-2024 VIA ESPANA VIA LOURDES VILLAGE CENTER DR 600 33 19,800 Overlay - AC Thin $ - FY 2023-2024 VIA LA NARANJA VIA PEPITA W END CDS 625 33 20,625 Overlay - AC Thin $ - FY 2023-2024 VIA LOURDES VIA LA NARANJA VIA ESPANA 267 27 7,709 Overlay - AC Thin $ - FY 2023-2024 VIA MADRID VIA PAMPLONA VIA DEL BUEY 400 33 13,200 Overlay - AC Thin $ - FY 2023-2024 VIA MIGUEL VIA ESPANA END CDS 370 33 16,511 Overlay - AC Thin $ - FY 2023-2024 VIA MARIANO FELIPA RD END OF CDS 261 33 12,914 Overlay - AC Thin $ - FY 2023-2024 VIA MARISA VIA CORZO END CDS 385 33 17,006 Overlay - AC Thin $ - FY 2023-2024 VIA NAVARRA VIA DEL BUEY VIA ESPANA 380 33 12,540 Overlay - AC Thin $ - FY 2023-2024 VIA PIEDRA VIA CORZO YORBA LINDA BLVD 582 33 19,206 Overlay - AC Thin $ - FY 2023-2024 VIA PAMPLONA VIA ESPANA VIA MADRID 233 33 8,189 Overlay - AC Thin $ - FY 2023-2024 VIA PIZARRO VIA DEL BUEY END CDS 129 33 8,558 Overlay - AC Thin $ - FY 2023-2024 VIA ROJA CALLE BONITA AVENIDA DE LOS SUENOS 720 33 24,260 Overlay - AC Thin $ - FY 2023-2024 VIA TEODOCIO FELIPA RD END CDS 400 33 17,501 Overlay - AC Thin $ - FY 2023-2024 VIA TOMAS DORINDA RD END OF CDS 262 32 12,685 Overlay - AC Thin $ - FY 2023-2024 VIA TRINIDAD VIA MIGUEL END CDS 478 33 20,075 Overlay - AC Thin $ - FY 2023-2024 VISTA GLEN CIR RIM CREST DR END CDS 938 29 31,503 Overlay - AC Thin $ - FY 2023-2024 VISTA DEL SOL END OF CDS AVENIDA DE LAS ESTRELLAS 1,151 33 42,284 Overlay - AC Thin $ - FY 2023-2024 WILLOW TREE LN ASPEN WAY END CDS 205 33 11,066 Overlay - AC Thin $ - FY 2023-2024 WESTWOOD LN STARLIGHT DR END OF CDS 198 33 10,835 Overlay - AC Thin $ - FY 2023-2024 WATERFORD DR DUNROBIN WAY END OF CDS 217 33 11,462 Overlay - AC Thin $ - FY 2023-2024 ALLONBY CIRCLE STONEHAVEN DR END CDS 355 33 11,715 SLURRY SEAL $ - FY 2023-2024
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
AVENIDA DE LAS ESTRELLAS END CDS YORBA LINDA BLVD 1,794 33 64,503 SLURRY SEAL $ - FY 2023-2024 AVENIDA DE LOS ARBOLES VIA ROJA VISTA DEL SOL 595 33 19,635 SLURRY SEAL $ - FY 2023-2024 AVENIDA DE LOS ARBOLES VISTA DEL SOL VISTA DEL NORTE 915 33 30,695 SLURRY SEAL $ - FY 2023-2024 AVE DE LA PAZ EASTSIDE END OF CDS 560 16 13,261 SLURRY SEAL $ - FY 2023-2024 AVIEMORE DR STONEHAVEN DR END OF CDS 2,197 37 86,590 SLURRY SEAL $ - FY 2023-2024 AVENIDA ADOBE NEW RIVER YORBA LINDA BLVD 1,813 37 67,081 SLURRY SEAL $ - FY 2023-2024 BLACK FOREST LN FAIRMONT BL END CDS 512 33 21,197 SLURRY SEAL $ - FY 2023-2024 BALAN TREE CIRCLE GREENHAVEN ST END OF CDS 106 33 7,799 SLURRY SEAL $ - FY 2023-2024 BLUE GUM DR RIM CREST DR END CDS 800 37 34,401 SLURRY SEAL $ - FY 2023-2024 BLUE MTN DR STONEHAVEN DR END CDS 777 37 33,050 SLURRY SEAL $ - FY 2023-2024 BRENTWOOD PL MISSION HILLS LN END OF CDS 1,168 33 42,845 SLURRY SEAL $ - FY 2023-2024 BRISBANE WAY DUNROBIN END OF CDS 228 33 11,825 SLURRY SEAL $ - FY 2023-2024 CLEAR HAVEN DR HICKORY TREE END CDS 342 33 15,587 SLURRY SEAL $ - FY 2023-2024 CLEARWATER DR GRANBY DR ROANOKE AVE 1,120 27 30,240 SLURRY SEAL $ - FY 2023-2024 CARDIFF DR HEATHERIDGE DR END CDS 323 31 14,314 SLURRY SEAL $ - FY 2023-2024 CRESCENT DR MISSION HILLS END OF CDS 407 33 17,732 SLURRY SEAL $ - FY 2023-2024 CASINO RIDGE RD SAN ANTONIO RD END OF ROAD 109 33 3,597 SLURRY SEAL $ - FY 2023-2024 D BAGLIO WAY GRANBY DR END CDS 613 35 25,756 SLURRY SEAL $ - FY 2023-2024 VIA DL BUEY VIA LA MANCHA END OF STREET 1,600 33 52,800 SLURRY SEAL $ - FY 2023-2024 AVENIDA DE LOS ARBOLES YORBA LINDA BLVD VIA ROJA 169 33 5,577 SLURRY SEAL $ - FY 2023-2024 DEVENPORT STONEHAVEN END CDS 271 33 13,244 SLURRY SEAL $ - FY 2023-2024 DEVERON COVE AVIEMORE DR END OF CDS 1,136 33 41,789 SLURRY SEAL $ - FY 2023-2024 EAST SIDE CIRCLE ESPARANZA RD END OF CDS 1,501 37 59,838 SLURRY SEAL $ - FY 2023-2024 FALLEN LEAF ROAD SINGINGWOOD DRIVE E END CDS 365 33 16,346 SLURRY SEAL $ - FY 2023-2024 FAIRMONT BLVD SAN ANTONIO EAGLES NEST S/S 1,970 37 72,890 SLURRY SEAL $ - FY 2023-2024 FAIRMONT BLVD EAGLES NEST S/S SHADOW OAK S/S 1,969 37 72,853 SLURRY SEAL $ - FY 2023-2024 FAIRMONT BLVD SHADOW OAK VILLAGE CENTER S/S 705 37 28,485 SLURRY SEAL $ - FY 2023-2024 FERN CIR SMOKETREE AVE END CDS 354 27 13,859 SLURRY SEAL $ - FY 2023-2024 FOREST GLEN RD RIM CREST DR END CDS 728 29 25,413 SLURRY SEAL $ - FY 2023-2024 FEATHER AVE GRANDBY CIR ROANOKE AVE 1,458 27 39,366 SLURRY SEAL $ - FY 2023-2024 GRANBY DR END CDS AVENIDA ADOBE AVE 1,790 35 66,951 SLURRY SEAL $ - FY 2023-2024 GREENHAVEN ST DEVERON COVE AVIEMORE DR 1,054 37 38,998 SLURRY SEAL $ - FY 2023-2024 HICKORY TREE LN VIEW PARK DR END CDS 426 37 20,063 SLURRY SEAL $ - FY 2023-2024 HIDDEN GLEN LN HIDDEN HILLS RD END OF CDS 264 26 11,165 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD ENT/HIDDEN HILLS EST MISSION HILLS 2,425 26 63,050 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD MISSION HILLS HIDDEN HILLS ESTATES S/B 2,425 26 63,050 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD MISSION HILLS STONE WOOD 1,749 37 66,228 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD STONEWOOD CUL DE SAC- END 1,257 37 46,509 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD CDS HIGH TREE 1,581 39 61,659 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD HIGHTREE CIR GREEN CREST N/S 1,704 36 61,344 SLURRY SEAL $ - FY 2023-2024 HIDDEN HILLS RD GREEN CREST END 1,220 36 43,920 SLURRY SEAL $ - FY 2023-2024 HEATHERIDGE DR STONEHAVEN DR HEATHRIDGE DR 2,455 31 77,605 SLURRY SEAL $ - FY 2023-2024 HEATHERWOOD LN DEVERON COVE GREEN HAVEN ST 759 37 28,583 SLURRY SEAL $ - FY 2023-2024 MACKENZIE AVE ROANOKE AVE GRANDBY DR 1,321 27 35,667 SLURRY SEAL $ - FY 2023-2024 NEW RIVER RD E/B YORBA LINDA BLVD ESPERANZA RD 1,270 22 32,670 SLURRY SEAL $ - FY 2023-2024 NEW RIVER RD W/B ESPERANZA RD YORBA LINDA BLVD 1,270 22 33,380 SLURRY SEAL $ - FY 2023-2024 ROCKHAMPTON CT STONEHAVEN DR END OF CDS 1,360 33 50,181 SLURRY SEAL $ - FY 2023-2024 REGAL OAKS DR CASSIA LN END CDS 263 27 11,402 SLURRY SEAL $ - FY 2023-2024
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
ROLLING HILLS LN END OF CDS END OF CDS 1,430 33 55,792 SLURRY SEAL $ - FY 2023-2024 SKYLINE DRIVE E/S MISSION HILLS LN END OF CDS 533 33 21,890 SLURRY SEAL $ - FY 2023-2024 SKYLINE DRIVE W/S MISSION HILLS END OF CDS 243 33 12,320 SLURRY SEAL $ - FY 2023-2024 SAN ANTONIO RD FAIRMONT BLVD END CDS 874 33 33,143 SLURRY SEAL $ - FY 2023-2024 SPRING OAK VIEW PARK DR END CDS 213 33 11,330 SLURRY SEAL $ - FY 2023-2024 SUTHERLAND DR ROCKHAMPTON CT END OF CDS 320 33 14,861 SLURRY SEAL $ - FY 2023-2024 STONEWOOD DR HIDDEN HILLS RD ROLLING HILLS LN 185 33 6,105 SLURRY SEAL $ - FY 2023-2024 STONEHAVEN YORBA LINDA BLVD AVIEMORE DR E/S 2,413 46 109,798 SLURRY SEAL $ - FY 2023-2024 STONEHAVEN AVIEMORE DR E/S HEATHERIDGE W/S 793 46 36,478 SLURRY SEAL $ - FY 2023-2024 STONEHAVEN HEARHERIDGE W/S BLUE MOUNTIAN E/S 1,422 37 52,614 SLURRY SEAL $ - FY 2023-2024 STONEHAVEN BLUE MOUNTIAN E/S VIA DE LA ROCA 600 46 27,600 SLURRY SEAL $ - FY 2023-2024 STIRLINGBRIDGE CIR STONEHAVEN DR END CDS 318 33 14,795 SLURRY SEAL $ - FY 2023-2024 THISTLEDOWN CIR ROCKHAMPTON CT END OF CDS 476 37 22,413 SLURRY SEAL $ - FY 2023-2024 TODD AVE ROANOKE AVE GRANBY DR 1,510 35 52,850 SLURRY SEAL $ - FY 2023-2024 VIA AMARILLA AVENIDA DE LOS ARBOLES END CDS 515 33 21,296 SLURRY SEAL $ - FY 2023-2024 VIA AZUL AVENIDA DE LAS ESTRELLAS END CDS 162 31 9,323 SLURRY SEAL $ - FY 2023-2024 VIA CABEZA VIA PEPITA END CDS 33 33 5,390 SLURRY SEAL $ - FY 2023-2024 VIA CONTENTO VIA CORZO END CDS 111 33 7,964 SLURRY SEAL $ - FY 2023-2024 VIA CORONA FELIPA RD END CDS 722 33 28,127 SLURRY SEAL $ - FY 2023-2024 VIA DE LA REATA VIA DEL AGUA END CDS 127 33 8,492 SLURRY SEAL $ - FY 2023-2024 VIA DEL CORRAL VIA DEL AGUA END CDS 591 33 24,304 SLURRY SEAL $ - FY 2023-2024 VIA DEL LEON VILLAGE CENTER DR VIA DE LA MULA 151 36 6,436 SLURRY SEAL $ - FY 2023-2024 VIA DEL AGUA VIA DE LA ROCA YORBA LINDA BLVD 1,417 37 52,429 SLURRY SEAL $ - FY 2023-2024 VIA DEL CERRO END CDS END CDS 1,244 33 49,654 SLURRY SEAL $ - FY 2023-2024 VIA DE LA ESPUELA VIA DEL AGUA END CDS 100 33 7,601 SLURRY SEAL $ - FY 2023-2024 VIA DEL PUENTE VIA DEL AGUA VIA DEL CERRO 300 33 9,900 SLURRY SEAL $ - FY 2023-2024 VIA LA MANCHA VIA DEL BUEY E END CDS 410 33 13,530 SLURRY SEAL $ - FY 2023-2024 VIA VIENTO AVENIDA DE LOS ARBOLES END OF CDS 270 33 13,211 SLURRY SEAL $ - FY 2023-2024 VISTA DEL NORTE AVE DE LOS ARBOLES END OF CDS 561 33 23,314 SLURRY SEAL $ - FY 2023-2024 VIEW PARK DR SAN ANTONIO RD END CDS 1,154 37 47,499 SLURRY SEAL $ - FY 2023-2024 WIND SONG CIR RIM CREST DR END CDS 137 33 8,822 SLURRY SEAL $ - FY 2023-2024 ALPINE LANE KODIAK MTN END CDS 239 28 10,993 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 5,946.00 FY 2024-2025 ALEUTIA WAY ELK MOUNTAIN DR END CDS 1,024 28 32,973 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 17,832.00 FY 2024-2025 AZELA CIRCLE WOODLAND AVE END OF CDS 408 33 17,765 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 9,608.00 FY 2024-2025 BIG HORN MTN WAY CAMINO DE BRYANT END CDS 1,706 33 60,599 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 32,772.00 FY 2024-2025 BIG HORN MTN WAY CAMINO DE BRYANT N END CDS 135 33 8,756 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 4,736.00 FY 2024-2025 BLUE RIDGE DR BIG HORN MTN END OF CDS 1,562 28 48,037 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 25,979.00 FY 2024-2025 BLACKBERRY WAY BAYBERRY WAY ELDERBERRY WAY 658 33 21,714 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 11,743.00 FY 2024-2025 BEN NEVIS WAY KODIAK MOUNTAIN DR END CDS 846 33 32,219 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 17,425.00 FY 2024-2025 BRUSH CANYON DR CAMINO DE BRYANT E/S MEADOW LAND DR W/S 2,053 37 80,262 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 43,406.00 FY 2024-2025 BRUSH CANYON DR MEADOW LAND DR W/S MEADOW LAKE LN W/S 2,193 37 81,141 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 43,882.00 FY 2024-2025 CAROT CT VAN GOGH WAY END OF CDS 20 33 4,961 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 2,683.00 FY 2024-2025 CAMINO DE BRYANT KODIAK MTN END CDS 960 33 35,981 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 19,459.00 FY 2024-2025 CAMINO DE BRYANT KODIAK MTN N/S MAIDEN MOOR N/S 2,236 33 74,788 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 40,446.00 FY 2024-2025 CAMINO DE BRYANT MAIDEN MOOR N/S PASEO DE TORONTO N/S 2,069 33 68,277 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 36,925.00 FY 2024-2025 CAMINO DE BRYANT PASEO DE TORONTO BRUSH CANYON DR 2,130 38 80,940 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 43,773.00 FY 2024-2025 CASTLE BEND WAY KODIAK MTN END OF CDS 731 28 20,468 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 11,070.00 FY 2024-2025 DAISY CIRCLE CAMINO DE BRYANT END CDS 100 28 7,101 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 3,841.00 FY 2024-2025
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
DELACROIX WAY CAMINO DE BRYANT PICASSO DR 1,125 33 37,125 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 20,078.00 FY 2024-2025 JOHN BIXBY RANCHO SANTA ANA ERNEST JOHNSON 230 33 7,819 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 4,229.00 FY 2024-2025 KODIAK MOUNTAIN DR CAMINO DE BRYANT MT. TRUMPH S/S 3,057 33 102,681 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 55,530.00 FY 2024-2025 MOUNT HOOD WAY SMOKEY MTN WAY END CDS 1,167 28 36,977 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 19,998.00 FY 2024-2025 MOUNT RAINER WAY SMOKEY MTN WAY END OF CDS 901 28 29,529 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 15,970.00 FY 2024-2025 MOUNT SHASTA WAY SMOKEY MTN WAY END OF CDS 1,311 28 41,009 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 22,178.00 FY 2024-2025 MOUNT WHITNEY WAY ELK MTN WAY END CDS 724 28 24,573 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 13,290.00 FY 2024-2025 MARQUET COURT PICASSO DR END OF CDS 261 33 12,914 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 6,984.00 FY 2024-2025 MERRY WEATHER CIR BLUE RIDGE DR END OF CDS 61 28 6,009 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 3,250.00 FY 2024-2025 RANCHO SANTA ANA POMEGRATE RD SUSANNA BRYANT 720 33 23,760 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 12,850.00 FY 2024-2025 ROSEWOOD DR BOX CANYON DR SLEEPING OAK DR 155 33 5,115 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 2,767.00 FY 2024-2025 SUSANNA BRYANT RANCHO SANTA ANA POMEGRANATE 220 33 7,260 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 3,927.00 FY 2024-2025 VIA LOMAS DE YORBA AVE DE MARCIA W/S BOX CANYON CT W/S 1,588 36 57,168 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 30,917.00 FY 2024-2025 WOODLAND AVE SLEEPING OAK DR FOXTAIL DR 586 33 19,338 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 10,458.00 FY 2024-2025 AVENIDA DEL TREN CAMINO VISTA W/S END OF CDS 163 26 8,539 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 8,723.00 FY 2024-2025 AVENIDA DE MICHELLE AVENIDA DE MARCIA END OF CDS 788 37 33,457 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 34,177.00 FY 2024-2025 AVENIDA DE MARCIA VIA LOMAS DE YORBA LA CRESCENTA E/S 1,843 37 68,191 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 69,658.00 FY 2024-2025 AVENIDA DE MARCIA LA CRESCENTA E/S VIA LOMAS DE YORBA 1,652 33 54,516 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 55,689.00 FY 2024-2025 BLUEBROOK LANE BRUSH CANYON N/S END OF CDS 534 33 21,923 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 22,395.00 FY 2024-2025 BOX CANYON CT VIA LOMAS DE YORBA END OF CDS 1,504 37 59,949 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 61,239.00 FY 2024-2025 EVENING BREEZE DR S/S BRUSH CANYON DR END OF CDS 2,155 33 75,416 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 77,039.00 FY 2024-2025 GREEN HOLLOW LN BRUSH CANYON DR END OF CDS 323 33 14,960 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 15,282.00 FY 2024-2025 IRON STONE DR CAMINO DE BRYANT END CDS 454 28 17,013 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 17,379.00 FY 2024-2025 LA CRESCENTA AVE DE MARCIA AVE DE MARCIA 1,291 37 48,267 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 49,306.00 FY 2024-2025 LA GRANDE AVENIDA DE MARCIA END OF CDS 236 33 12,089 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 12,350.00 FY 2024-2025 LA HOMA LA CRESCENTA END OF CDS 342 33 15,587 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 15,923.00 FY 2024-2025 MAIDEN MOOR LN CAMINO DE BRYANT END CDS 174 28 9,173 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 9,371.00 FY 2024-2025 MEADOW LAND DR BRUSH CANYON DR CAMINO DE BRYANT 2,258 33 74,514 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 76,117.00 FY 2024-2025 MULBERRY WAY BRUSH CANYON DR END OF CDS 330 33 15,191 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 15,518.00 FY 2024-2025 OLD VILLAGE RD LA PALMA LA PALMA 1,562 33 51,546 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 52,655.00 FY 2024-2025 PASEO DE TORONTO CANTADA E/S VIA LOMAS DE YORBA 1,231 33 40,623 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 41,497.00 FY 2024-2025 SLEEPING OAK DR WOODLAND AVE LOTUS AVE 395 33 13,535 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 13,827.00 FY 2024-2025 VIA LOMAS DE YORBA RR BRIDGE S/S LA PALMA N/S 678 54 36,612 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 37,400.00 FY 2024-2025 VIA LOMAS DE YORBA COPPER CANYON N/S LA PALMA 762 33 25,146 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 25,687.00 FY 2024-2025 VAN GOGH WAY PICASSO DR DELACROIX WAY 1,457 33 48,081 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR $ 49,116.00 FY 2024-2025 AVENIDA DEL TREN CAMINO VISTA W/S VIA LEONARDO 1,432 33 47,256 2 in Overlay+10% Localized Inlay+5% BR $ 156,176.00 FY 2024-2025 CAMINO CLARO VIA VALLARTA VIA LAS BRISAS 225 37 8,325 2 in Overlay+10% Localized Inlay+5% BR $ 27,514.00 FY 2024-2025 CAMINO CALUROSO VISTA LAMPARA END OF CDS 712 33 27,797 2 in Overlay+10% Localized Inlay+5% BR $ 91,866.00 FY 2024-2025 CAMINO BESAR VIA BUENA SUERTE END OF CDS 567 33 23,012 2 in Overlay+10% Localized Inlay+5% BR $ 76,053.00 FY 2024-2025 CAMINO PONIENTE VIA BUENA SUERTE END OF CDS 346 33 15,719 2 in Overlay+10% Localized Inlay+5% BR $ 51,950.00 FY 2024-2025 CAMINO VISTA VIA LENARDO AVENIDA DEL TREN 954 33 31,482 2 in Overlay+10% Localized Inlay+5% BR $ 104,045.00 FY 2024-2025 CRYSTAL DR MIRAGE ST BRIDGE @ WEIR CANYON 840 61 51,240 2 in Overlay+10% Localized Inlay+5% BR $ 175,501.00 FY 2024-2025 LOS MONTEROS VIA LOMAS DE YORBA PASEO DE TORONTO 2,346 37 86,802 2 in Overlay+10% Localized Inlay+5% BR $ 286,871.00 FY 2024-2025 MIRAGE ST SAVI RANCH PKWY OLD CANAL RD. 436 61 28,596 2 in Overlay+10% Localized Inlay+5% BR $ 97,944.00 FY 2024-2025 MIRAGE ST SAVI RANCH PKWY CRYSTAL 450 61 30,450 2 in Overlay+10% Localized Inlay+5% BR $ 104,294.00 FY 2024-2025 OLD CANAL ROAD BRIDGE @ WEIR CANYON SAVI RANCH PKWY 2,922 50 146,100 2 in Overlay+10% Localized Inlay+5% BR $ 500,403.00 FY 2024-2025 PASEO DE TORONTO VIA LOMAS DE YORBA AVENIDA DEL TREN 1,759 33 66,047 2 in Overlay+10% Localized Inlay+5% BR $ 218,278.00 FY 2024-2025 RUNNING SPRING WAY EVENING BREEZE N/S BRUSH CANYON N/S 920 30 27,600 2 in Overlay+10% Localized Inlay+5% BR $ 91,215.00 FY 2024-2025
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
SAVI RANCH PKWY CITY BOUNDARY OLD CANAL RD 1,270 50 61,500 2 in Overlay+10% Localized Inlay+5% BR $ 210,642.00 FY 2024-2025 VIA ARRIBA LINDA VIA LOMAS DE YORBA W/S VIA BRAVO 1,210 33 39,930 2 in Overlay+10% Localized Inlay+5% BR $ 131,965.00 FY 2024-2025 VIA BRAVO VIA ARRIBA LINDA VIA VERANO 767 33 25,311 2 in Overlay+10% Localized Inlay+5% BR $ 83,651.00 FY 2024-2025 BIDWELL DR DRAKE ST END CDS 1,014 35 40,291 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 22,661.00 FY 2025-2026 BLACK WALNUT CT SILVER DOLLAR WY CDS 475 34 20,219 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 11,372.00 FY 2025-2026 BLUE SPRUCE LN RED PINE RD SILVER MAPLE DR 1,884 38 71,592 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 40,266.00 FY 2025-2026 BRAMBLE CT VALLEY VIEW CIR CDS 1,425 38 58,219 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 32,745.00 FY 2025-2026 CAMINO AYALA VISTA VISCAINO END CDS 222 33 11,627 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 6,540.00 FY 2025-2026 CARLTON PL RIDGEDALE LN BRIARDALE LN 200 33 6,600 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 3,713.00 FY 2025-2026 CARSON WAY VALLEY VIEW CIR FREMONT LN 324 33 11,192 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 6,295.00 FY 2025-2026 CHICAGO AVE SECOND ST END CDS 479 37 22,024 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 12,388.00 FY 2025-2026 CLOVERDALE WY VALLEY VIEW CIR END CDS 925 33 34,826 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 19,588.00 FY 2025-2026 DIEMER RD VALLEY VIEW CIR E/S CITY LIMITS 327 50 16,350 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 10,218.00 FY 2025-2026 DENVER AVE BASTANCHURY RD BROOKLYN AVE 1,137 33 38,021 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 21,385.00 FY 2025-2026 DRAKE ST 496'' W/O VALLEY VIEW CIR END CDS 859 27 27,494 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 15,464.00 FY 2025-2026 DRAKE ST VALLEY VIEW CIR 496'' W/O VALLEY VIEW CIR 496 33 16,368 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 9,206.00 FY 2025-2026 EDGEWOOD LN VALLEY VIEW CIR 700'' E/O VALLEY VIEW CIR 700 33 23,100 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 12,993.00 FY 2025-2026 GARDENIA LN JASMINE WY SOUTH CDS 1,730 32 59,429 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 33,425.00 FY 2025-2026 GARDENIA LN JASMINE WY NORTH CDS 698 32 26,405 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 14,852.00 FY 2025-2026 GOLDEN AVE ROSE DR 472'' W/O ROSE DR 472 60 28,320 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 15,929.00 FY 2025-2026 GOLDEN WILLOW CT BLUE SPRUCE LN CDS 103 33 7,468 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 4,201.00 FY 2025-2026 HUGGINS AVE ROSE DR JEANEAN LN 660 33 23,780 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 13,375.00 FY 2025-2026 LONCREST CIRCLE HUGGINS AVE END CDS 89 33 7,238 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 4,071.00 FY 2025-2026 MIMOSA DR EL CAJON AVE N END CDS 157 33 9,482 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 5,333.00 FY 2025-2026 MIMOSA DR EL CAJON AVE S END CDS 415 33 17,996 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 10,122.00 FY 2025-2026 ORANGE TERRACE VALLEY VIEW END CDS 437 37 20,470 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 11,513.00 FY 2025-2026 PEACH TREE LN APPLE ORCHARD DR END CDS 268 33 13,027 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 7,327.00 FY 2025-2026 PRENTISS DR LOIE ST END CDS 636 33 25,289 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 14,224.00 FY 2025-2026 PRENTISS PL PRENTISS DR END CDS 108 33 3,564 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 2,005.00 FY 2025-2026 RANCHO LN PROSPECT AVE W END CDS 577 33 23,342 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 13,129.00 FY 2025-2026 RICHFIELD WAY YORBA LINDA BLVD END CDS 225 37 12,626 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 7,102.00 FY 2025-2026 REGULUS DR VAN BUREN ST BRIARHILL DR 557 37 20,609 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 11,592.00 FY 2025-2026 RED PINE RD VALLEY VIEW CIR CDS 651 33 25,552 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 14,372.00 FY 2025-2026 RICARDO DR PACIFIC AVE END CDS 215 33 11,396 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 6,410.00 FY 2025-2026 ROXDALE DR END CDS END 400 33 17,501 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 9,844.00 FY 2025-2026 SECOND ST MARDA AVE LOS ANGELES ST 630 37 23,310 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 13,111.00 FY 2025-2026 SILVER MAPLE DR NORTH CDS SOUTH CDS 532 34 26,226 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 14,751.00 FY 2025-2026 SWEET BAY CT IRON BARK WY CDS 203 33 10,768 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 6,057.00 FY 2025-2026 TRIX CIR BASTANCHURY RD END CDS 126 33 8,459 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 4,758.00 FY 2025-2026 VAN BUREN ST REGULUS DR YORBA LINDA BLVD 465 33 16,345 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 9,193.00 FY 2025-2026 VAN BUREN CIRCLE VAN BUREN ST END CDS 52 37 6,225 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 3,502.00 FY 2025-2026 VISTA LN RANCHO LN END CDS 120 33 8,261 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 4,647.00 FY 2025-2026 VALLEY VIEW AVE LAKEVIEW AVE S/S VALLEY VIEW CIR N/S 811 50 45,350 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 28,341.00 FY 2025-2026 VALLEY VIEW AVE DIEMER RD S/S RED PINE RD N/S 1,931 30 63,430 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 39,639.00 FY 2025-2026 VALLEY VIEW AVE RED PINE RD N/S CAMINO CABRILLO N/S 1,906 30 67,180 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 41,983.00 FY 2025-2026 VALLEY VIEW AVE CAMINO CABRILLO N/S VALLEY VIEW AVE W/S 2,324 30 80,720 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 50,444.00 FY 2025-2026 VISTA VIZCAINO CAMINO CABRILLO CAMINO AYALA 205 33 6,765 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 3,805.00 FY 2025-2026 WALNUT ST THIRD ST END CDS 508 33 21,065 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 11,848.00 FY 2025-2026
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
WALNUT ST VALLEY VIEW AVE SECOND ST 671 37 24,827 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 13,964.00 FY 2025-2026 WALNUT ST SECOND ST THIRD ST 614 37 22,718 Crack Seal + Slurry Seal+ 3% Localized Inlay $ 12,778.00 FY 2025-2026 ASPENGLOW CIRCLE ASPENGLOW LN END CDS 133 33 8,690 2 in Overlay + 2% BR $ 16,835.00 FY 2025-2026 CASA LOMA AVE BROOKLYN AVE BASTANCHURY RD 1,152 33 38,016 2 in Overlay + 2% BR $ 73,648.00 FY 2025-2026 ORANGE DR 100'' W/O BRIARHILL VALLEY VIEW AVE 1,274 33 42,042 2 in Overlay + 2% BR $ 81,447.00 FY 2025-2026 PROSPECT AVE BASTANCHURY RD HILLCREST CIRCLE 2,050 33 67,650 2 in Overlay + 2% BR $ 131,057.00 FY 2025-2026 SAN RAFAEL LN VALLEY VIEW CIR SANTA CLARA CT 314 36 11,304 2 in Overlay + 2% BR $ 21,899.00 FY 2025-2026 SANTA CLARA CT WEST CDS EAST CDS 280 28 11,909 2 in Overlay + 2% BR 23,071.00 $ FY 2025-2026 VALLEY VIEW AVE VALLEY VIEW CIR N/S DIEMER RD S/S 1,227 45 49,715 2 in Overlay + 2% BR 108,739.00 $ FY 2025-2026 LOS ANGELES SECOND ST IMPERIAL HWY 485 27 13,095 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 14,731.00 $ FY 2025-2026 PACIFIC AVE LA CONCETTA DR RICARDO DR 243 33 8,019 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 8,520.00 $ FY 2025-2026 CHIANTI CT TRENTINO LN GENOA WY 2,378 33 78,474 Crack Seal + Slurry Seal+ 3% Localized Inlay 45,902.00 $ FY 2026-2027 CHURCHILL DOWNS DR OAKLAWN LN CDS 327 33 14,860 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,693.00 $ FY 2026-2027 CLEVELAND BAY LN JUTLAND LN CDS 341 32 14,981 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,763.00 $ FY 2026-2027 CLYDESDALE DR BASTANCHURY RD BRETON LN 1,462 47 68,714 Crack Seal + Slurry Seal+ 3% Localized Inlay 40,193.00 $ FY 2026-2027 CORTONA CT E CDS W CDDS 1,496 33 57,970 Crack Seal + Slurry Seal+ 3% Localized Inlay 33,909.00 $ FY 2026-2027 VIA DE LA LUNA N/S AVENIDA PUESTA DEL SOL END CDS 748 33 28,985 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,955.00 $ FY 2026-2027 VIA DE LA PLAZA S/S AVENIDA DEL RAY END CDS 734 33 28,523 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,684.00 $ FY 2026-2027 VIA DEL RANCHO PUESTA DEL SOL END CDS 537 33 22,022 Crack Seal + Slurry Seal+ 3% Localized Inlay 12,882.00 $ FY 2026-2027 FLORENCE RD CORTONA CT CDS 835 33 31,856 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,634.00 $ FY 2026-2027 GENOA WY CHIANTI CT CDS 1,862 33 65,747 Crack Seal + Slurry Seal+ 3% Localized Inlay 38,458.00 $ FY 2026-2027 HOOSIER LAWN WY OAKLAWN LN CDS 754 33 28,951 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,935.00 $ FY 2026-2027 JUTLAND LN MORGAN CT CDS 1,026 32 36,901 Crack Seal + Slurry Seal+ 3% Localized Inlay 21,585.00 $ FY 2026-2027 KRUEGER ST BASTANCHURY RD OAKLAWN LN 128 36 4,608 Crack Seal + Slurry Seal+ 3% Localized Inlay 2,696.00 $ FY 2026-2027 LA CUESTA CIR LA ENTRADA END CDS 256 33 12,749 Crack Seal + Slurry Seal+ 3% Localized Inlay 7,458.00 $ FY 2026-2027 VIA LA PRIMAVERA AVENIDA PUESTA DEL SOL END CDS 635 33 25,256 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,773.00 $ FY 2026-2027 VIA LA QUINTA AVENIDA PUESTA DEL SOL END CDS 556 33 22,649 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,249.00 $ FY 2026-2027 LIVORNO WY CHIANTI CT CDS 571 33 23,144 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,538.00 $ FY 2026-2027 LEMON DRIVE LAKEVIEW W/S MAIN ST 763 38 28,994 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,844.00 $ FY 2026-2027 LORCA LN FAIRMONT BLVD ORLANDO DR 143 33 4,719 Crack Seal + Slurry Seal+ 3% Localized Inlay 2,761.00 $ FY 2026-2027 MILANO CT TRENTINO LN GENOA WY 1,940 33 64,020 Crack Seal + Slurry Seal+ 3% Localized Inlay 37,448.00 $ FY 2026-2027 MAIN ST IMPERIAL HWY LEMON DR 665 24 23,220 Crack Seal + Slurry Seal+ 3% Localized Inlay 15,092.00 $ FY 2026-2027 NAPLES CT UMBRIA WY CDS 833 33 31,790 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,595.00 $ FY 2026-2027 PASO FINO WY CLYDESDALE DR CDS 677 32 25,733 Crack Seal + Slurry Seal+ 3% Localized Inlay 15,052.00 $ FY 2026-2027 PIMLICO TER SANTA ANITA WAY CDS 472 34 20,117 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,768.00 $ FY 2026-2027 QUIET MEADOW LN ARBOR GATE LN COBBLESTONE CT 285 33 9,405 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,502.00 $ FY 2026-2027 RAINBOW LN WEATHERLY DR END CDS 424 33 18,293 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,701.00 $ FY 2026-2027 SEGOVIA LN CASIANO DR END OF CDS 325 33 12,094 Crack Seal + Slurry Seal+ 3% Localized Inlay 7,075.00 $ FY 2026-2027 SOUTHERN HILLS WY LAKEVIEW AVE W HILLS WY 388 33 12,804 Crack Seal + Slurry Seal+ 3% Localized Inlay 7,490.00 $ FY 2026-2027 SYCAMORE CIRCLE AVOCADO AVE END CDS 484 34 20,757 Crack Seal + Slurry Seal+ 3% Localized Inlay 12,142.00 $ FY 2026-2027 TEMHURST CT OAKLAWN LN CDS 310 32 13,989 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,183.00 $ FY 2026-2027
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
TRENTINO LN FAIRMONT BLVD CORTONA CT 1,424 37 52,688 Crack Seal + Slurry Seal+ 3% Localized Inlay 30,819.00 $ FY 2026-2027 TUSCANY WY TRENTINO LN VOLTERRA LN 352 33 11,616 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,795.00 $ FY 2026-2027 UMBRIA WY TRENTINO LN CDS 2,620 37 101,241 Crack Seal + Slurry Seal+ 3% Localized Inlay 59,219.00 $ FY 2026-2027 VIA ALEGRE AVENIDA DEL NORTE END CDS 396 33 17,369 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,160.00 $ FY 2026-2027 VOLTERRA LN TUSCANY WY CDS 423 33 18,260 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,681.00 $ FY 2026-2027 VERONA LN CASIANO DR END CDS 596 36 25,757 Crack Seal + Slurry Seal+ 3% Localized Inlay 15,067.00 $ FY 2026-2027 ZAHARIAS RIDGE LAKEVIEW AVE SARAZEN CT 975 37 36,075 Crack Seal + Slurry Seal+ 3% Localized Inlay 21,102.00 $ FY 2026-2027 CARRERA RD BASTANCHURY RD CHIANTI CT 140 55 6,840 2 in Overlay + 2% BR 13,781.00 $ FY 2026-2027 FOREST GLEN RD RIM CREST DR END CDS 728 29 25,413 2 in Overlay + 2% BR 51,202.00 $ FY 2026-2027 PLUMOSA DR CARI LN BASTANCHURY RD 1,168 33 38,544 2 in Overlay + 2% BR 77,657.00 $ FY 2026-2027 AVOCADO AVE YORBA LINDA BLVD N/S ORIENTE S/S 2,107 23 48,461 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 59,843.00 $ FY 2026-2027 CITRIO DORA AVE SYCAMORE CIRCLE EVERGREEN AVE 290 34 10,360 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 11,447.00 $ FY 2026-2027 COUPLES CT HOGAN DR CDS 157 33 9,482 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 10,477.00 $ FY 2026-2027 DEBI LN EUREKA LN END CDS 623 33 24,860 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 27,467.00 $ FY 2026-2027 AVENIDA DEL NORTE VIA ALEGRE AVENIDA RIO DEL ORO 266 36 9,576 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 10,581.00 $ FY 2026-2027 EUREKA AVENUE MARK LN BASTANCHURY RD 763 26 19,838 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 24,497.00 $ FY 2026-2027 EUREKA AVENUE IMPERIAL HWY N/S MARK N/S 1,277 36 45,972 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 56,769.00 $ FY 2026-2027 EUREKA AVENUE IMPERIAL HWY YORBA LINDA BLVD 1,741 36 62,676 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 69,249.00 $ FY 2026-2027 LEMON DRIVE MAIN ST IMPERIAL E/S 755 38 28,690 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 35,428.00 $ FY 2026-2027 NICKLAUS RD SHEEHAN ST CDS 796 33 30,569 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 33,775.00 $ FY 2026-2027 OHIO ST YORBA LINDA BLVD ORIENTE S/S 1,920 27 52,540 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 64,880.00 $ FY 2026-2027 PIPER PL LAKEVIEW AVE PLUMOSA DR 1,224 37 45,288 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 50,038.00 $ FY 2026-2027 PUESTA DEL SOL W/S AVENIDA RIO DEL ORO AVENIDA DE LAS FLORES 1,030 36 37,080 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 40,969.00 $ FY 2026-2027 AVENIDA RIO DEL ORO AVENIDA DEL NORTE PUESTA DEL SOL N/S 2,360 36 85,460 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 94,422.00 $ FY 2026-2027 SARAZEN CT ZAHARIAS RIDGE CDS 626 33 24,959 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 27,577.00 $ FY 2026-2027 SCHOOL ST AVOLINDA DR PIPER PL 356 33 11,748 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 12,980.00 $ FY 2026-2027 SHARON CIRCLE KAYE LN END CDS 159 33 9,548 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 10,550.00 $ FY 2026-2027 VALENCIA AVE PIPER PL END CDS 94 33 7,403 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 8,180.00 $ FY 2026-2027 AVOCADO AVE ORIENTE S/S END 2,013 30 60,390 2 in Overlay+10% Localized Inlay+5% BR 239,418.00 $ FY 2026-2027 CASA LOMA AVE BASTANCHURY RD S/S IMPERIAL HWY S/S 1,091 33 38,625 2 in Overlay+10% Localized Inlay+5% BR 153,130.00 $ FY 2026-2027 VIA DE LAS MONTANAS AVENIDA DE LAS FLORES END CDS 55 27 1,485 2 in Overlay+10% Localized Inlay+5% BR 5,309.00 $ FY 2026-2027 LEMON DRIVE IMPERIAL HWY W/S EUREKA AVE 674 26 17,524 2 in Overlay+10% Localized Inlay+5% BR 69,475.00 $ FY 2026-2027 OHIO ST ORIENTE S/S END 1,320 24 33,480 2 in Overlay+10% Localized Inlay+5% BR 132,733.00 $ FY 2026-2027 PALM AVE YORBA LINDA N/S ORIENTE S/S 1,938 30 60,296 2 in Overlay+10% Localized Inlay+5% BR 239,045.00 $ FY 2026-2027 PEPPERGROVE ST END OF CDS LAKEVIEW AVE 816 33 31,229 2 in Overlay + 2% BR 65,436.00 $ FY 2027-2028 TERRA LINDA LN VAN BUREN ST HARVEST WAY 120 33 3,960 2 in Overlay + 2% BR 8,298.00 $ FY 2027-2028 BUENA VISTA AVE RICHFIELD RD E HIGHLAND 1,940 60 116,400 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 133,751.00 $ FY 2027-2028 CANDLELIGHT LANE MARIPOSA AVE END CDS 471 33 19,844 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 22,802.00 $ FY 2027-2028 CASCADES AVE REDWOOD ST CITY LIMIT 653 33 21,549 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 24,762.00 $ FY 2027-2028 CUMBERLAND CIRCLE JEFFERSON ST END CDS 669 33 26,378 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 30,310.00 $ FY 2027-2028
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
HEATHER WAY HIGHLAND AVE LAKEVIEW AVE 1,082 33 35,706 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 41,029.00 $ FY 2027-2028 MARIPOSA AVE HIGHLAND AVE LAKEVIEW AVE 996 33 32,868 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 37,768.00 $ FY 2027-2028 OHIO ST LINDA VERDE BUENA VISTA AVE 467 37 17,279 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 19,855.00 $ FY 2027-2028 REDWOOD ST CASCADES AVE CUMBERLAND CIR 679 33 22,407 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 25,748.00 $ FY 2027-2028 SARATOGA ST CUMBERLAND CIR CASCADES AVE 669 33 22,077 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 25,368.00 $ FY 2027-2028 SCENIC VIEW DR OHIO ST BUENA VISTA AVE 1,118 33 36,894 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 42,394.00 $ FY 2027-2028 KINGSPORT DR CARRIAGE CIR CUMBERLAND CIR 200 33 6,600 2 in Overlay+10% Localized Inlay+5% BR 24,536.00 $ FY 2027-2028 ACACIA HILL DR END CDS COUNTRY VIEW 1,072 29 35,389 Crack Seal + Slurry Seal+ 3% Localized Inlay 22,390.00 $ FY 2028-2029 ACACIA HILL DR COUNTRY VIEW COUNTRY VIEW 1,131 33 37,823 Crack Seal + Slurry Seal+ 3% Localized Inlay 23,930.00 $ FY 2028-2029 AMBERDALE DR FAIRMONT BL CANYON DR 2,929 37 108,373 Crack Seal + Slurry Seal+ 3% Localized Inlay 68,564.00 $ FY 2028-2029 ARROYO CAJON E/B KELLOG DR FOXFIELD LANE 2,046 23 47,058 Crack Seal + Slurry Seal+ 3% Localized Inlay 29,772.00 $ FY 2028-2029 ARROYO CAJON W/B FOXFIELD LANE KELLOGG 2,049 23 50,007 Crack Seal + Slurry Seal+ 3% Localized Inlay 31,638.00 $ FY 2028-2029 ASTER LN LUPINE ST END CDS 279 33 13,508 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,546.00 $ FY 2028-2029 BIG SPRING DR FAIRMONT BLVD WALNUT CREEK DR 230 33 7,590 Crack Seal + Slurry Seal+ 3% Localized Inlay 4,802.00 $ FY 2028-2029 BLUEFIELD PLAZA OAK MEADOW DR END CDS 671 33 22,143 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,009.00 $ FY 2028-2029 BRIDLE LN SADDLETREE LN END OF CDS 359 33 16,148 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,217.00 $ FY 2028-2029 BROOKHILL DR OLD RANCH END CDS 1,506 33 49,698 Crack Seal + Slurry Seal+ 3% Localized Inlay 31,442.00 $ FY 2028-2029 BROOKMONT DR END CDS CANYON DR 1,498 36 53,928 Crack Seal + Slurry Seal+ 3% Localized Inlay 34,119.00 $ FY 2028-2029 BURLEIGH DR MANOR VIEW DR END CDS 655 33 25,916 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,397.00 $ FY 2028-2029 COUNTRY VIEW DR END CDS ACACIA HILL DR 2,468 33 85,745 Crack Seal + Slurry Seal+ 3% Localized Inlay 54,248.00 $ FY 2028-2029 CANYON DRIVE BROOKMONT DR FAIRMONT BLVD 2,964 33 97,812 Crack Seal + Slurry Seal+ 3% Localized Inlay 61,882.00 $ FY 2028-2029 CAPRICE DR MANOR VIEW END CDS 680 33 26,741 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,918.00 $ FY 2028-2029 CRESTKNOLL DR CANYON DR CITY BOUNDARY 874 36 31,464 Crack Seal + Slurry Seal+ 3% Localized Inlay 19,906.00 $ FY 2028-2029 DEERFOOT LANE ARROYO CAJON END CDS 228 33 11,825 Crack Seal + Slurry Seal+ 3% Localized Inlay 7,482.00 $ FY 2028-2029 DUNSMUR PLAZA OAKMEADOW DR END CDS 564 33 18,612 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,776.00 $ FY 2028-2029 DORAL CT WAGON WHEEL END CDS 88 33 7,205 Crack Seal + Slurry Seal+ 3% Localized Inlay 4,559.00 $ FY 2028-2029 FELICIA DR AVENIDA RIO DEL ORO LUPINE ST 1,970 33 65,010 Crack Seal + Slurry Seal+ 3% Localized Inlay 41,130.00 $ FY 2028-2029 FAIRLYNN BLVD BROOKMONT DR CRESTKNOLL 819 37 30,303 Crack Seal + Slurry Seal+ 3% Localized Inlay 19,172.00 $ FY 2028-2029 FURNACE CREEK RD WALNUT CREEK RD FAIRMONT BLVD 1,306 33 44,098 Crack Seal + Slurry Seal+ 3% Localized Inlay 27,900.00 $ FY 2028-2029 FERN GLEN DR AMBERDALE DR CANYON DR 1,785 33 58,905 Crack Seal + Slurry Seal+ 3% Localized Inlay 37,267.00 $ FY 2028-2029 FERNWOOD PLAZA OAK MEADOW DR END CDS 550 33 18,150 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,483.00 $ FY 2028-2029 FUTURA DR FAIRMONT BLVD END CDS 621 33 24,794 Crack Seal + Slurry Seal+ 3% Localized Inlay 15,687.00 $ FY 2028-2029 FOX FIELD LN ARROYO CAJON DR PARKSIDE DR 1,132 33 37,356 Crack Seal + Slurry Seal+ 3% Localized Inlay 23,634.00 $ FY 2028-2029 GLENDALE DR LARKRIDGE DR CRESTKNOLL DR 438 36 15,768 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,976.00 $ FY 2028-2029 GLENDALE DR CRESTKNOLL DR CANYON DR 438 36 15,768 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,976.00 $ FY 2028-2029 GLEN HAVEN DR FERNGLEN DR FAIRMONT BLVD 1,043 33 34,919 Crack Seal + Slurry Seal+ 3% Localized Inlay 22,092.00 $ FY 2028-2029 GLEN PL FERNGLEN DR END CDS 225 33 11,726 Crack Seal + Slurry Seal+ 3% Localized Inlay 7,419.00 $ FY 2028-2029 GREEN LEAF PLAZA OAK MEADOW DR END CDS 542 33 17,886 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,316.00 $ FY 2028-2029 HIBISCUS CIR FELICIA DR END CDS 61 27 5,948 Crack Seal + Slurry Seal+ 3% Localized Inlay 3,764.00 $ FY 2028-2029 HILLCOCK VIEW PLAZA RIDGEWOOD PL END CDS 668 33 23,044 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,580.00 $ FY 2028-2029
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
HILLSIDE DR CANYON DR RIVERVIEW DR 969 33 31,977 Crack Seal + Slurry Seal+ 3% Localized Inlay 20,231.00 $ FY 2028-2029 HILLTOP PL HILLSIDE DR END CDS 200 33 10,901 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,897.00 $ FY 2028-2029 KINGSBRIAR DR PARKVIEW RIDGEWOOD PL 1,008 33 33,264 Crack Seal + Slurry Seal+ 3% Localized Inlay 21,045.00 $ FY 2028-2029 LE MANS CIR MANOR VIEW DR END CDS 429 33 18,458 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,678.00 $ FY 2028-2029 LANCEWOOD PLAZA OAK MEADOW DR END CDS 551 33 18,183 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,504.00 $ FY 2028-2029 LUPINE ST AVENIDA RIO DEL ORO END CDS 1,960 33 68,981 Crack Seal + Slurry Seal+ 3% Localized Inlay 43,642.00 $ FY 2028-2029 LARKFIELD DR KINGSBRIAR DR OAK MEADOW DR 250 33 8,250 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,220.00 $ FY 2028-2029 LARKFIELD DR OAKMEADOW DR END CDS 456 33 15,048 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,521.00 $ FY 2028-2029 LARKRIDGE DR CITY BOUNDARY GLENDALE DR 151 36 5,436 Crack Seal + Slurry Seal+ 3% Localized Inlay 3,440.00 $ FY 2028-2029 LYNNBROOK PZ END CDS END CDS 1,563 33 51,579 Crack Seal + Slurry Seal+ 3% Localized Inlay 32,632.00 $ FY 2028-2029 MANOR VIEW DR FUTURA DR CAPRICE DR 1,184 33 39,072 Crack Seal + Slurry Seal+ 3% Localized Inlay 24,720.00 $ FY 2028-2029 MOUNTAIN VIEW AVE LYNNBROOK PZ COUNTRY VIEW DR 342 33 11,286 Crack Seal + Slurry Seal+ 3% Localized Inlay 7,141.00 $ FY 2028-2029 NOVA DR MANOR VIEW DR FAIRMONT BLVD 140 37 5,180 Crack Seal + Slurry Seal+ 3% Localized Inlay 3,278.00 $ FY 2028-2029 OAK MEADOW DR FAIRMONT BLVD BROOKMOUNT DR 2,921 33 96,393 Crack Seal + Slurry Seal+ 3% Localized Inlay 60,984.00 $ FY 2028-2029 PASEO ARNALDO PASEO LORENZO N END CDS 140 33 8,921 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,644.00 $ FY 2028-2029 PASEO GILBERTO VISTA MONTANA PASEO LORENZO 1,600 33 52,800 Crack Seal + Slurry Seal+ 3% Localized Inlay 33,405.00 $ FY 2028-2029 PASEO JOAQUIN PASEO LORENZO END CDS 502 33 20,867 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,202.00 $ FY 2028-2029 PASEO LORENZO PASEO GILBERTO VISTA LAGUNA 1,261 33 42,113 Crack Seal + Slurry Seal+ 3% Localized Inlay 26,644.00 $ FY 2028-2029 PASEO LUIS PASEO GILBERTO END CDS 764 33 29,513 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,672.00 $ FY 2028-2029 PEPPERTREE LANE SADDLETREE LN END CDS 430 33 18,991 Crack Seal + Slurry Seal+ 3% Localized Inlay 12,015.00 $ FY 2028-2029 PLACERVILLE PL FURNACE CREEK RD END CDS 142 33 8,987 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,686.00 $ FY 2028-2029 PARKHURST PL COUNTRY VIEW DR END CDS 715 33 27,896 Crack Seal + Slurry Seal+ 3% Localized Inlay 17,649.00 $ FY 2028-2029 PARK RIDGE KELLOG WAGON WHEEL 122 30 3,660 Crack Seal + Slurry Seal+ 3% Localized Inlay 2,316.00 $ FY 2028-2029 PARKSIDE DR SADDLETREE LANE COUNTRY VIEW DR 1,052 33 34,716 Crack Seal + Slurry Seal+ 3% Localized Inlay 21,964.00 $ FY 2028-2029 PARKVIEW TER OAK MEADOW DR LYNNBROOK PZ 475 34 17,150 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,851.00 $ FY 2028-2029 PARKVIEW TER OAK MEADOW DR KINGSBRIAR DR 244 33 8,052 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,095.00 $ FY 2028-2029 PASEO DE LAS PALOMAS E/B FAIRMONT BLVD N/S VIA DEL MAR N/S 1,464 29 45,056 Crack Seal + Slurry Seal+ 3% Localized Inlay 31,673.00 $ FY 2028-2029 PASEO DE LAS PALOMAS E/B VIA DEL MAR N/S VILLAGE CENTER W/S 1,157 29 43,945 Crack Seal + Slurry Seal+ 3% Localized Inlay 30,892.00 $ FY 2028-2029 PASEO DE LAS PALOMAS W/B VILLAGE CENTER S/S VISTA LAGUNA S/S 1,275 29 39,575 Crack Seal + Slurry Seal+ 3% Localized Inlay 27,820.00 $ FY 2028-2029 PASEO DE LAS PALOMAS W/B VISTA LAGUNA S/S FAIRMONT BLVD S/S 1,464 29 45,756 Crack Seal + Slurry Seal+ 3% Localized Inlay 32,165.00 $ FY 2028-2029 RIDGEWOOD PL KINGSBRAIR DR OAK MEADOW DR 217 33 7,161 Crack Seal + Slurry Seal+ 3% Localized Inlay 4,531.00 $ FY 2028-2029 RIDGEWOOD PL OAK MEADOW DR BROOKHILL DR 1,075 33 35,975 Crack Seal + Slurry Seal+ 3% Localized Inlay 22,760.00 $ FY 2028-2029 AVENIDA RIO DEL ORO YORBA LINDA BLVD FELICIA DR 415 40 18,200 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,515.00 $ FY 2028-2029 RIVERVIEW DR END CDS GLENDALE DR 572 33 23,177 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,664.00 $ FY 2028-2029 SADDLETREE LANE PEPPERTREE LANE END CDS 1,720 33 61,061 Crack Seal + Slurry Seal+ 3% Localized Inlay 38,631.00 $ FY 2028-2029 SHADY GLEN PL FAIRMONT BLVD END OF CDS 319 33 10,756 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,805.00 $ FY 2028-2029 SUMAC RIDGE STONE CANYON END CDS 540 33 22,121 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,996.00 $ FY 2028-2029 SOMERVILLE CIR WALNUT CREEK RD END CDS 164 33 9,713 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,146.00 $ FY 2028-2029 SANDS POINT STONE CANYON END CDS 116 32 8,013 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,070.00 $ FY 2028-2029 SANDY HILL LANE ARROYO CAJON DR PARK SIDE DR 1,227 33 40,491 Crack Seal + Slurry Seal+ 3% Localized Inlay 25,618.00 $ FY 2028-2029
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
STONE CANYON AVE WAGON WHEEL DR WAGON WHEEL DR 1,320 33 44,560 Crack Seal + Slurry Seal+ 3% Localized Inlay 28,192.00 $ FY 2028-2029 STONECREST LANE ARROYO CAJON DR END CDS 611 33 24,464 Crack Seal + Slurry Seal+ 3% Localized Inlay 15,478.00 $ FY 2028-2029 STONEHURST PZ CANYON DR END CDS 557 33 18,381 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,629.00 $ FY 2028-2029 SUNMIST DR ARROYO CAJON DR MOUNTAIN VIEW AVE 1,570 33 51,810 Crack Seal + Slurry Seal+ 3% Localized Inlay 32,779.00 $ FY 2028-2029 SWEETWATER PL FURANCE CREEK RD END CDS 92 33 7,337 Crack Seal + Slurry Seal+ 3% Localized Inlay 4,642.00 $ FY 2028-2029 TRAIL CREST LN SADDLETREE LN END CDS 629 27 21,284 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,466.00 $ FY 2028-2029 TOYON TERRACE COUNTRY VIEW DR END CDS 76 33 6,809 Crack Seal + Slurry Seal+ 3% Localized Inlay 4,308.00 $ FY 2028-2029 VIA ADELA VISTA LAGUNA END CDS 303 33 14,300 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,048.00 $ FY 2028-2029 VIA ALMERIA VISTA DEL MAR END CDS 633 34 25,823 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,338.00 $ FY 2028-2029 VIA BADALONA VISTA DEL MAR END CDS 431 34 18,955 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,993.00 $ FY 2028-2029 VIA BURGOS VISTA DEL MAR W END CDS 700 33 27,401 Crack Seal + Slurry Seal+ 3% Localized Inlay 17,336.00 $ FY 2028-2029 VIA BURGOS VISTA DEL MAR E END CDS 200 33 10,901 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,897.00 $ FY 2028-2029 VIA CANARIAS VISTA DEL MAR END CDS 687 33 22,671 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,344.00 $ FY 2028-2029 VIA CELESTINA VISTA DEL MAR END CDS 1,259 33 46,348 Crack Seal + Slurry Seal+ 3% Localized Inlay 29,323.00 $ FY 2028-2029 VIA DANIEL VISTA LAGUNA END CDS 505 33 20,966 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,265.00 $ FY 2028-2029 VIA DONALDO VISTA MONTANA END CDS 642 33 25,487 Crack Seal + Slurry Seal+ 3% Localized Inlay 16,125.00 $ FY 2028-2029 VIA EL TAJO VISTA DEL MAR E END CDS 440 33 14,520 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,187.00 $ FY 2028-2029 VIA ESTER VISTA LAGUNA END CDS 452 33 19,217 Crack Seal + Slurry Seal+ 3% Localized Inlay 12,158.00 $ FY 2028-2029 VIA GUADALUPE VISTA DEL MAR END CDS 1,362 33 49,247 Crack Seal + Slurry Seal+ 3% Localized Inlay 31,157.00 $ FY 2028-2029 VIA GERALDINA VISTA LAGUNA END CDS 434 33 18,623 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,783.00 $ FY 2028-2029 VIA HABANA VISTA DEL MAR END CDS 517 33 21,362 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,515.00 $ FY 2028-2029 VIA INFANTA VISTA DEL MAR END CDS 153 33 9,350 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,916.00 $ FY 2028-2029 VIA ISABELLA VIA MARWAH END CDS 284 33 13,673 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,651.00 $ FY 2028-2029 VIA LA VIEJA VISTA DEL MAR END CDS 743 34 29,563 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,704.00 $ FY 2028-2029 VIA LUCIA VIA MARWAH END CDS 193 33 10,670 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,751.00 $ FY 2028-2029 VIA LINARES VISTA DEL MAR END CDS 303 33 14,300 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,048.00 $ FY 2028-2029 VIA LERIDA VISTA DEL MAR END CDS 422 33 18,227 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,532.00 $ FY 2028-2029 VIA LAS VILLAS VISTA DEL MAR END CDS 562 34 23,409 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,810.00 $ FY 2028-2029 VIA MAGDALENA VISTA DEL MAR END CDS 436 33 18,689 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,824.00 $ FY 2028-2029 VIA MARGARITA VISTA LAGUNA END CDS 390 33 17,171 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,864.00 $ FY 2028-2029 VIA MANRESA VISAT DEL MAR END CDS 416 34 18,445 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,670.00 $ FY 2028-2029 VIA MANZANILLO VISTA DEL MAR END CDS 992 34 38,029 Crack Seal + Slurry Seal+ 3% Localized Inlay 24,060.00 $ FY 2028-2029 VIA MONITA VIA MIRAMAR W END CDS 1,150 34 39,100 Crack Seal + Slurry Seal+ 3% Localized Inlay 24,737.00 $ FY 2028-2029 VIA MIRAMAR VISTA DEL MAR VIA NATILE 293 33 9,669 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,118.00 $ FY 2028-2029 VIA MARWAH W/S VILLAGE CENTER DR VIA LUCIA 560 38 21,280 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,463.00 $ FY 2028-2029 VIA MARWAH W/S VIA LUCIA VISTA MONTANA 850 38 32,300 Crack Seal + Slurry Seal+ 3% Localized Inlay 20,435.00 $ FY 2028-2029 VIA ANGELINA S END CDS N END CDS 814 33 35,464 Crack Seal + Slurry Seal+ 3% Localized Inlay 22,437.00 $ FY 2028-2029 VIA ANGELINA E END CDS W END CDS 722 33 32,428 Crack Seal + Slurry Seal+ 3% Localized Inlay 20,516.00 $ FY 2028-2029 VIA NATALIE VIA MIRAMAR W END CDS 1,000 33 33,000 Crack Seal + Slurry Seal+ 3% Localized Inlay 20,878.00 $ FY 2028-2029 VIA PASA VISTA DEL MAR END CDS 133 33 8,690 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,498.00 $ FY 2028-2029
Appendix A
Seven-Year Road Maintenance and Rehabilitation Plan Based on City's Current Funding Local
Sorted by Year of Treatment
Local
Street Name From To Length of
Segment (ft)
Wifdth of
Segment (ft)
Pavement
Area (sf) Treatment Type Cost of Treatment Year of Treatment Limits of Work
VIA RICARDO VISTA MONTANA END CDS 382 33 16,907 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,697.00 $ FY 2028-2029 VIA SARA VIA MONITA S END CDS 110 26 2,860 Crack Seal + Slurry Seal+ 3% Localized Inlay 1,810.00 $ FY 2028-2029 VIA SAMUEL VISTA MONTANA END CDS 463 33 19,580 Crack Seal + Slurry Seal+ 3% Localized Inlay 12,388.00 $ FY 2028-2029 VIA SAN LUCAR VISTA DEL MAR END CDS 888 34 34,493 Crack Seal + Slurry Seal+ 3% Localized Inlay 21,823.00 $ FY 2028-2029 VIA SANTA MARIA N/S VILLAGE CENTER VISTA DEL MAR 261 48 13,128 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,306.00 $ FY 2028-2029 VIA TALAVERA VISTA DEL MAR END CDS 375 33 16,676 Crack Seal + Slurry Seal+ 3% Localized Inlay 10,551.00 $ FY 2028-2029 VIA TALAVERA VISTA DEL MAR END CDS 610 33 28,732 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,178.00 $ FY 2028-2029 VIA TENORIA VISTA DEL MAR END CDS 314 33 14,663 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,277.00 $ FY 2028-2029 VIA TARARA VISTA DEL MAR END CDS 452 33 19,217 Crack Seal + Slurry Seal+ 3% Localized Inlay 12,158.00 $ FY 2028-2029 VIA TARRAGONA VISTA DEL MAR END CDS 828 34 32,453 Crack Seal + Slurry Seal+ 3% Localized Inlay 20,532.00 $ FY 2028-2029 VIA TORRALBA VISTA DEL MAR END CDS 324 34 15,317 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,691.00 $ FY 2028-2029 VIA TROVADOR VISTA DEL MAR END CDS 745 33 28,886 Crack Seal + Slurry Seal+ 3% Localized Inlay 18,276.00 $ FY 2028-2029 VIA VIGO VIA TALAVERA END CDS 143 33 9,020 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,707.00 $ FY 2028-2029 VIA VARADERO VISTA DEL MAR END CDS 588 33 23,705 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,998.00 $ FY 2028-2029 VIA ZARAGOZA VISTA DEL MAR END CDS 782 33 30,107 Crack Seal + Slurry Seal+ 3% Localized Inlay 19,048.00 $ FY 2028-2029 VIA GLORIA VISTA MONTANA VIA ANGELINA 242 33 7,986 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,053.00 $ FY 2028-2029 VIA JUANA VISTA MONTANA END CDS 341 33 15,554 Crack Seal + Slurry Seal+ 3% Localized Inlay 9,841.00 $ FY 2028-2029 VISTA LAGUNA PASEO DE LAS PALOMAS VILLAGE CENTER DR 2,740 24 70,560 Crack Seal + Slurry Seal+ 3% Localized Inlay 49,601.00 $ FY 2028-2029 VISTA LAGUNA VILLAGE CENTER DR PASEO DE LAS PALOMAS 2,740 24 80,360 Crack Seal + Slurry Seal+ 3% Localized Inlay 56,490.00 $ FY 2028-2029 VISTA MONTANA VISTA LAGUNA W/S VIA GLORIA S/S 2,113 40 89,648 Crack Seal + Slurry Seal+ 3% Localized Inlay 63,019.00 $ FY 2028-2029 VISTA MONTANA VIA GLORIA S/S VISTA LAGUNA N/S 2,337 40 99,152 Crack Seal + Slurry Seal+ 3% Localized Inlay 69,700.00 $ FY 2028-2029 VIA VIRGINIA VISTA MONTANA VIA ANGELINA 243 33 8,019 Crack Seal + Slurry Seal+ 3% Localized Inlay 5,074.00 $ FY 2028-2029 VILLAGER CIR MANOR VIEW DR END CDS 430 33 18,491 Crack Seal + Slurry Seal+ 3% Localized Inlay 11,699.00 $ FY 2028-2029 VISTA DEL MAR E/B PASEO DE LAS PALOMAS 80FT N OF VIA VADERO 599 20 11,980 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,422.00 $ FY 2028-2029 VISTA DEL MAR E/B 80 FT N OF VIA VARADERO 150 FT SO OF MANZANILLO 1,688 20 33,760 Crack Seal + Slurry Seal+ 3% Localized Inlay 23,732.00 $ FY 2028-2029 VISTA DEL MAR E/B 150 FT S. OF MANZANILLO VIA LERIDA 4,177 20 83,540 Crack Seal + Slurry Seal+ 3% Localized Inlay 58,725.00 $ FY 2028-2029 VISTA DEL MAR E/B LERIDA VILLAGE CENTER 891 20 19,420 Crack Seal + Slurry Seal+ 3% Localized Inlay 13,652.00 $ FY 2028-2029 VISTA DEL MAR W/B VILLAGE CENTER VIA LERDIA 866 20 20,520 Crack Seal + Slurry Seal+ 3% Localized Inlay 14,425.00 $ FY 2028-2029 VISTA DEL MAR W/B LERIDA VIA SANLUCAR 4,018 20 81,960 Crack Seal + Slurry Seal+ 3% Localized Inlay 57,615.00 $ FY 2028-2029 VISTA DEL MAR W/B VIA SANLUCAR VIA VARADERO 80FT N 1,815 20 36,300 Crack Seal + Slurry Seal+ 3% Localized Inlay 25,518.00 $ FY 2028-2029 VISTA DEL MAR W/B VIA VARADERO 80FT N PASEO DE LAS PALOMAS 535 20 12,300 Crack Seal + Slurry Seal+ 3% Localized Inlay 8,647.00 $ FY 2028-2029 WAGON WHEEL DR STONE CANYON AVE STONE CANYON AVE 1,300 33 42,900 Crack Seal + Slurry Seal+ 3% Localized Inlay 27,142.00 $ FY 2028-2029 WALNUT CREEK RD END CDS FURNACE CREEK RD 836 33 27,588 Crack Seal + Slurry Seal+ 3% Localized Inlay 17,454.00 $ FY 2028-2029 WINCHESTER LANE SADDLETREE LANE SANDY HILL 300 33 9,900 Crack Seal + Slurry Seal+ 3% Localized Inlay 6,264.00 $ FY 2028-2029 COACHWOOD LN FAIRMONT BLVD END OF CDS 460 37 21,321 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 25,480.00 $ FY 2028-2029 KINGSBRIAR DR BROOKMONT DR PARKVIEW 2,040 33 67,320 Crack Seal +Slurry Seal +3% Localized Inlay +2%BR 80,449.00 $ FY 2028-2029
Pavement Management Plan Agency Submittal
Page | 10
XII. Appendix B – Complete Street Listing Current Conditions A complete street listing of current pavement conditions should be included in this report. Specific data to be submitted should follow the format below:
MPAH
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
LOCAL
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
Please attach the complete street listing, following the above template, after this sheet. The pages should be labeled Appendix B.
Appendix B
MPAH Street Listing - Current Conditions
Sorted by by Street Name
MPAH
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
BASTANCHURY RD IMPERIAL HWY W/S OSMOND E/S 60 37,800 69 02-12-22 BASTANCHURY RD ROSE DR W/S CITY LIMIT 60 59,160 66 02-12-22 BASTANCHURY RD OSMOND ST E/S PROSPECT AVE E/S 82 87,986 65 02-12-22 BASTANCHURY RD CASA LOMA E/S VALLEY VIEW AVE E/S 72 86,984 74 02-12-22 BASTANCHURY RD EUREKA S/S CASA LOMA E/S 41 60,240 64 02-03-22 BASTANCHURY RD LAKEVIEW AVE E/S EUREKA E/S 57 148,086 93 02-03-22 BASTANCHURY RD HUMBOLDT LANE E/S CLYDESDALE DR W/S 61 132,973 81 02-03-22 BASTANCHURY RD CLYDESDALE DR W/S 2571'' W/O FAIRMONT BLVD 61 78,427 72 02-03-22 BASTANCHURY RD 2571'' W/O FAIRMONT BLVD FAIRMONT BLVD W/S 61 156,831 72 02-03-22 BASTANCHURY RD LAKEVIEW AVE E/S HUMBOLDT LN E/S 61 91,005 93 02-03-22 BASTANCHURY RD VALLEY VIEW AVE E/S IMPERIAL HWY W/S 72 70,415 87 02-12-22 BASTANCHURY RD PROSPECT AVE W/S ROSE DR E/S 60 76,920 76 02-12-22 ESPERANZA RD LINDSEY DR E/S PASEO DEL PRADO E/S 74 153,210 67 02-28-22 ESPERANZA RD BOUNDARY FAIRMONT BLVD W/S 74 99,556 72 02-28-22 ESPERANZA RD PASEO DEL PRADO E/S YORBA RANCH RD E/S 75 148,410 65 02-28-22 ESPERANZA RD YORBA RANCH RD E/S VIA DEL CASADOR E/S 75 148,635 63 02-28-22 ESPERANZA RD VIA DEL CASADOR E/S AVENIDA BARCELONA W/S 75 106,645 63 02-28-22 ESPERANZA RD NEW RIVER E/S EAST SIDE CIRCLE E/S 74 44,400 60 02-28-22 ESPERANZA RD EAST SIDE CIRCLE E/S HIDDEN HILLS ESTATES ENTR 34 35,020 58 02-28-22 ESPERANZA RD AVENIDA BARCELONA W/S NEW RIVER E/S 75 106,570 70 02-28-22 ESPERANZA RD FAIRMONT BLVD W/S LINDSEY DR E/S 74 99,556 69 02-28-22 FAIRMONT BLVD S/B PASEO DE LAS PALOMAS GLENHAVEN S/S 24 47,624 95 03-01-22 FAIRMONT BLVD S/B GLENHAVEN S/S NOB HILL DR N/S 32 56,240 95 03-01-22 FAIRMONT BLVD S/B EDUCATION CTR NORTH ENT EDUCATION CTR SO ENTRANCE 32 21,888 74 02-02-22 FAIRMONT BLVD S/B SO ENTR TO EDUCATION CTR CORDOVA N/S 24 54,746 61 02-02-22 FAIRMONT BLVD S/B CORDOVA N/S LORCA N/S 24 37,688 39 02-02-22 FAIRMONT BLVD S/B FAIRMONT CONNECTOR NOB HILL 50 84,000 95 03-01-22 FAIRMONT BLVD PASEO DE LAS PALOMAS S/S OAK MEADOW N/S 59 61,158 94 02-07-22 FAIRMONT BLVD OAK MEADOW N/S NOVA S/S 59 125,257 93 02-07-22 FAIRMONT BLVD NOVA S/S YORBA LINDA BLVD S/S 60 49,380 94 02-07-22 FAIRMONT BLVD YORBA LINDA BLVD N/S LORCA N/S 60 45,180 55 02-02-22 FAIRMONT BLVD FOREST S/S VILLAGE CENTER 60 104,100 77 02-14-22 FAIRMONT BLVD QUARTER HORSE DR N/S FOREST S/S 62 131,686 72 02-02-22 FAIRMONT BLVD YORBA EDUC. CENTER QUARTER HORSE DR N/S 62 120,590 76 02-02-22 FAIRMONT BLVD N/B FAIRMONT CONNECTOR VILLAGE CENTER S/S 40 72,000 95 03-01-22 FAIRMONT BLVD N/B VILLAGE CENTER S/S BIG SPRING N/S 32 84,816 95 03-01-22 FAIRMONT BLVD N/B BIG SPRING N/S PASEO DE LAS PALOMAS S/S 32 35,944 95 03-01-22 FAIRMONT BLVD N/B LORCA N/S CAMROSA N/S 32 54,000 79 02-02-22 FAIRMONT BLVD N/B CAMAROSA N/S YORBA LINDA EC ENTRANCE 32 72,560 55 02-02-22 FAIRMONT CONNECTOR ESPERANZA RD FAIRMONT BLVD 84 65,940 95 02-28-22 IMPERIAL HIGHWAY (HWY 90) LAKEVIEW AVE 1311'' S/O LAKEVIEW AVE 79 104,358 79 02-25-22 IMPERIAL HIGHWAY (HWY 90) BUENA VISTA AVE 1468'' S/O BUENA VISTA AVE 79 119,303 78 02-25-22 IMPERIAL HIGHWAY (HWY 90) KELLOGG DR 1519'' S/O KELLOG DR 72 113,003 76 03-02-22 IMPERIAL HIGHWAY (HWY 90) CITY LIMITS PROSPECT AVE 102 89,915 61 02-15-22 IMPERIAL HIGHWAY (HWY 90) PROSPECT AVE 1068'' S/O PROSPECT AVE 101 106,496 64 02-15-22 IMPERIAL HIGHWAY (HWY 90) BASTANCHURY RD VALLEY VIEW AVE 105 99,200 73 02-15-22 IMPERIAL HIGHWAY (HWY 90) VALLEY VIEW AVE 758'' S/O VALLEY VIEW 106 75,585 54 02-08-22 IMPERIAL HIGHWAY (HWY 90) CASA LOMA AVE EUREKA DRIVE 98 136,290 67 02-08-22 IMPERIAL HIGHWAY (HWY 90) LEMON DR YORBA LINDA BLVD 92 151,274 54 02-08-22 IMPERIAL HIGHWAY (HWY 90) EUREKA DRIVE LEMON DRIVE 98 92,590 61 02-08-22 IMPERIAL HIGHWAY (HWY 90) 1468'' S/O BUENA VISTA AVE KELLOGG DR 79 119,303 79 02-25-22 IMPERIAL HIGHWAY (HWY 90) 1519'' S/O KELLOG DR CITY LIMITS 72 113,003 86 03-02-22
Appendix B
MPAH Street Listing - Current Conditions
Sorted by by Street Name
MPAH
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
IMPERIAL HIGHWAY (HWY 90) 1068'' S/O PROSPECT AVE BASTANCHURY RD 101 106,496 69 02-15-22 IMPERIAL HIGHWAY (HWY 90) YORBA LINDA BLVD LAKEVIEW AVE 92 48,965 69 02-25-22 IMPERIAL HIGHWAY (HWY 90) 1311'' S/O LAKEVIEW AVE BUENA VISTA AVE 79 104,280 84 02-25-22 IMPERIAL HIGHWAY (HWY 90) 758'' S/O VALLEY VIEW CASA LOMA AVE 106 75,585 58 02-08-22 IMPERIAL HIGHWAY (HWY 90) WESTBOUND OFF-RAMP (On to Kellogg) 26 26,189 90 03-01-22 IMPERIAL HIGHWAY (HWY 90) EASTBOUND ON-RAMP (From Kellogg) 26 28,772 87 03-01-22 IMPERIAL HIGHWAY (HWY 90) EASTBOUND OFF RAMP (On to Kellogg) 26 27,879 87 03-01-22 IMPERIAL HIGHWAY (HWY 90) WESTBOUND ON-RAMP (From Kellogg) 26 27,771 89 03-01-22 KELLOGG DR YORBA LINDA BLVD S/S SHADOW HILL N/S (City Limit) 50 63,000 95 02-08-22 KELLOGG DR CITY LIMITS MOUNTAIN VIEW S/S 50 28,716 95 02-08-22 KELLOGG DR MOUNTAIN VIEW S/S GRANDVIEW AVE 50 110,850 95 02-08-22 KELLOGG DR GRANDVIEW AVE N/S IMPERIAL HWY N/S 50 13,100 95 02-08-22 LA PALMA AVE CITY BOUNDARY 1000'' FROM BOUNDARY 86 86,000 86 02-17-22 LA PALMA AVE 2000'' FROM BOUNDARY 3661'' FROM BOUNDARY 86 142,846 75 02-17-22 LA PALMA AVE GYPSUM CYN W/S CAMINO DE BRYANT TO SANCT 64 103,168 72 02-17-22 LA PALMA AVE 1000'' FROM BOUNDARY 2000'' FROM BOUNDARY 86 86,000 85 02-17-22 LA PALMA AVE E/B VIA LOMAS DE YORBA W E/S 1235'' S/O VIA LOMAS DE YORBA 86 106,210 81 02-17-22 LA PALMA AVE E/B YLBP ENTRANCE E/B 928'' S/O YLBP ENTRANCE 86 79,808 90 02-17-22 LA PALMA AVE E/B OLD VILLAGE WEST E/S VIA LOMAS DE YORBA W/S 86 144,050 95 02-17-22 LA PALMA AVE E/B VIA LOMAS DE YORBA W/S CORBIT PLACE W/S 86 118,483 88 02-17-22 LA PALMA AVE E/B CORBIT PLACE W/S GYPSUM CYN W/S 86 131,555 82 02-17-22 LA PALMA AVE E/B 1235'' S/O VIA LOMAS DE YORBA YL BP ENTRANCE W/S 86 106,210 88 02-17-22 LA PALMA AVE E/B 928'' S/O YLBP ENTRANCE OLD VILLAGE E/S 86 79,808 94 02-17-22 LAKEVIEW AVE MARIPOSA S/S PEPPERGROVE S/S 50 74,550 72 02-22-22 LAKEVIEW AVE PEPPERGROVE S/S 120'' N/O BUENA VISTA 60 106,956 77 02-22-22 LAKEVIEW AVE 120'' N/O BUENA VISTA 120'' S/O FLORA DR 48 59,184 95 02-22-22 LAKEVIEW AVE 120'' S/O FLORA DR S/S IMPERIAL HWY BRIDGE 60 73,430 95 02-22-22 LAKEVIEW AVE N/S IMPERIAL HWY BRIDGE YORBA LINDA S/S 80 43,040 95 02-22-22 LAKEVIEW AVE YORBA LINDA N/S LEMON DR 60 79,740 85 02-03-22 LAKEVIEW AVE LEMON DR ORIENTE S/S 60 53,700 70 02-03-22 LAKEVIEW AVE ORIENTE S/S 600FT S/O S H 60 37,800 72 02-03-22 LAKEVIEW AVE 120'' N/O SOUTHERN HILLS BASTANCHURY S/S 34 21,590 91 02-06-22 LAKEVIEW AVE VALLEY VIEW DUMMURRY LN 50 121,050 80 02-14-22 LAKEVIEW AVE 120 N OF SH 600FT S/O S H 30 21,600 86 02-03-22 LAKEVIEW AVE 120 N OF SH 600FT S/O SH SB 30 21,600 76 02-03-22 LAKEVIEW AVE DUMMURRY LN HOGAN DR 50 112,700 74 02-14-22 LAKEVIEW AVE HOGAN DR BASTANCHURY RD 50 103,900 70 02-14-22 RICHFIELD RD WILLOW CIRCLE ORCHARD DR 60 88,200 80 02-22-22 RICHFIELD RD BUENA VISTA AVE WILLOW CIRCLE 60 139,560 77 02-22-22 RICHFIELD RD ROCK ROSE N/S BUENA VISTA S/S 60 64,800 75 02-22-22 RICHFIELD RD YORBA LINDA S/S ROCK ROSE N/S 60 112,860 75 02-22-22 ROSE DR PROMENADE AVE NORTH CITY LIMIT 22 25,300 86 02-15-22 ROSE DR WABASH AVE S/S PROMENADE AVE N/S 60 41,700 72 02-15-22 ROSE DR 600'' S/o WABASH (City Limit) WABASH AVE 80 48,960 75 02-15-22 ROSE DR BASTANCHURY RD 200'' S/o IMPERIAL HWY (City Li 80 140,000 60 02-15-22 ROSE DR VERNA LN BASTANCHURY RD 80 117,200 61 02-15-22
ROSE DR YORBA LINDA BLVD OAKHURST CIR N/S 80 91,647 66 02-15-22 ROSE DR OAKHURST CIR N/S VERNA LN S/S 80 91,647 70 02-15-22 VILLAGE CENTER DR N/B YORBA LINDA BLVD N/S VIA ESPANA N/S 29 56,930 78 02-10-22 VILLAGE CENTER DR N/B VIA ESPANA N/S MANZANITA S/S 24 37,288 73 02-10-22 VILLAGE CENTER DR N/B MANZANITA S/S FAIRMONT S/S 23 52,819 85 02-10-22 VILLAGE CENTER DR N/B FAIRMONT BLVD N/S VIA SANTA MARIA 29 45,336 63 02-10-22
Appendix B
MPAH Street Listing - Current Conditions
Sorted by by Street Name
MPAH
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VILLAGE CENTER DR N/B VIA SANTA MARIA N/S VIA ALCANTARA N/S 29 64,525 83 02-10-22 VILLAGE CENTER DR N/B VIA ALACANTARA PASEO DE LAS PALOMAS S/S 29 49,106 74 02-10-22 VILLAGE CENTER DR N/B PASEO DE LAS PALOMAS S/S VIA MARWAH 29 52,789 67 02-10-22 VILLAGE CENTER DR N/B VIA MARWAH N/S YORBA LINDA N/S 29 59,256 71 02-10-22 VILLAGE CENTER DR S/B YORBA LINDA BLVD N/S VISTA LAGUNA S/S 29 61,924 64 02-10-22 VILLAGE CENTER DR S/B VISTA LAGUNA S/S PASEO DE LAS PALOMAS S/S 29 51,194 69 02-10-22 VILLAGE CENTER DR S/B PASEO DE LAS PALOMAS S/S VIA SANTA MARIA N/S 29 115,786 75 02-10-22 VILLAGE CENTER DR S/B VIA SANTA MARIA N/S FAIRMONT BLVD 29 45,800 82 02-10-22 VILLAGE CENTER DR S/B FAIRMONT BLVD S/B MANZANITA S/S 23 55,619 86 02-10-22 VILLAGE CENTER DR S/B MANZANITA S/S ESPANA S/S 24 37,288 77 02-10-22 VILLAGE CENTER DR S/B ESPANA N/S YORBA LINDA BLVD 29 59,730 82 02-10-22 VALLEY VIEW AVE IMPERIAL HWY S/S ORANGE N/S 60 126,900 69 02-14-22 VALLEY VIEW AVE BASTANCHURY S/S IMPERIAL N/S 60 22,200 73 02-14-22 VALLEY VIEW AVE N/B BASTANCHURY RD S/S MARDA AVE S/S 26 24,310 73 02-14-22 VALLEY VIEW AVE N/B MARDA AVE S/S LAKEVIEW AVE S/S 26 30,160 68 02-14-22 VALLEY VIEW AVE S/B MARDA AVE S/S BASTANCHURY RD S/S 26 24,310 83 02-14-22 VALLEY VIEW AVE S/B LAKEVIEW AVE S/S MARDA AVE S/S 26 30,160 74 02-14-22 WEIR CANYON RD CENTERLINE 91 FWY CITY LIMIT @ BRIDGE 39 62,790 70 03-01-22 YORBA LINDA BLVD AVENIDA ADOBE N/S BRIDGE AT ESPERANZA 32 64,100 86 03-01-22 YORBA LINDA BLVD BRIDGE AT ESPERANZA AVENIDA ADOBE N/S 32 60,800 54 03-05-22 YORBA LINDA BLVD VIA DEL ESCUELA W/S AVENIDA ADOBE W/S 32 81,610 86 03-01-22 YORBA LINDA BLVD AVENIDA ADOBE N/S VIA DEL ESCUELA N/S 32 83,340 84 02-07-22 YORBA LINDA BLVD YORBA RANCH W/S VIA DEL ESCUELA W/S 32 62,324 86 03-01-22 YORBA LINDA BLVD VIA DEL ESCUELA N/S YORBA RANCH N/S 32 62,774 80 02-07-22 YORBA LINDA BLVD PASEO DE LAS PALOMAS E/S YORBA RANCH W/S 32 53,720 93 03-01-22 YORBA LINDA BLVD YORBA RANCH N/S PASEO DE LAS PALOMAS S/S 32 52,750 81 02-07-22 YORBA LINDA BLVD VILLAGE CENTER DR E/S PASEO DE LAS PALOMAS E/S 32 92,044 92 03-01-22 YORBA LINDA BLVD PASEO DE LAS PALOMAS W/S VILLAGE CENTER DR W/S 32 90,224 82 02-07-22 YORBA LINDA BLVD BEG OF ISLAND VILLAGE CENTER E/S 32 110,840 91 03-01-22 YORBA LINDA BLVD AVE NIDA RIO DEL ORO E/S END OF ISLAND 32 34,176 86 02-07-22 YORBA LINDA BLVD VILLAGE CENTER DR W/S AVENIDA RIO DEL ORO E/S 29 67,241 86 02-07-22 YORBA LINDA BLVD KELLOGG DR E/S BEG OF ISLAND PRESCHOOL 40 101,120 95 02-07-22 YORBA LINDA BLVD BEG MEDIAN ISLAND KELLOGG DR E/S 40 101,120 95 02-07-22 YORBA LINDA BLVD OHIO ST E/S KELLOGG DR W/S 32 72,400 95 02-07-22 YORBA LINDA BLVD KELLOGG DR E/S OHIO ST E/S 40 87,000 95 02-07-22 YORBA LINDA BLVD AVOCADO AVE W/S OHIO ST E/S 32 53,440 48 01-27-22 YORBA LINDA BLVD OHIO ST E/S AVOCADO AVE W/S 32 59,600 49 01-27-22 YORBA LINDA BLVD LAKEVIEW AVE W/S AVOCADO AVE W/S 32 42,528 67 02-23-22 YORBA LINDA BLVD AVOCADO AVE W/S LAKEVIEW W/S 32 42,528 66 02-23-22 YORBA LINDA BLVD LAKEVIEW AVE W/S IMPERIAL HWY E/S 80 38,160 69 02-23-22 YORBA LINDA BLVD EUREKA AVE E/S IMPERIAL HWY W/S 32 68,802 80 02-23-22 YORBA LINDA BLVD IMPERIAL HWY W/S EUREKA AVE E/S 32 60,576 74 02-23-22 YORBA LINDA BLVD CASA LOMA AVE W/S EUREKA AVE W/S 32 48,256 84 02-23-22 YORBA LINDA BLVD EUREKA AVE E/S CASA LOMA AVE E/S 32 40,960 86 02-23-22 YORBA LINDA BLVD CASA LOMA AVE W/S VALLEY VIEW AVE E/S 80 101,040 75 02-23-22 YORBA LINDA BLVD VAN BUREN E/S TORIDA WAY W/S 80 78,860 77 02-23-22 YORBA LINDA BLVD ROSE DR W/S (City Limit) LINDA VISTA (City Limit) 64 54,368 82 03-01-22 YORBA LINDA BLVD VALLEY VIEW AVE E/S VAN BUREN E/S 80 70,400 78 02-23-22 YORBA LINDA BLVD TORIDA WAY W/S PROSPECT AVE E/S (CITY LIMITS) 80 78,860 75 02-23-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
ABBEY LN LIVERPOOL ST END CDS 33 10,307 81 02-10-22
ABBY GLEN DR CAMINO DE BRYANT END CDS 28 28,829 82 09-17-15 ACACIA HILL DR END CDS COUNTRY VIEW 29 35,389 95 02-09-22 ACACIA HILL DR COUNTRY VIEW COUNTRY VIEW 33 37,823 95 02-09-22 ACORN CT S END N END 33 21,659 95 02-08-22
ADAMS CIRCLE JUSTIN WAY END CDS 33 6,600 81 03-05-20
VIA ALAMEDA AVENIDA PUESTA DEL SOL END OF CDS 33 29,655 86 02-04-22 ALDER AVE SAN ANTONIO RD END CDS 37 39,710 64 02-14-22
ALFORD CIRCLE LANDMARK AVE N END CDS 33 8,228 79 02-09-22 ALFORD CIRCLE LANDMARK AVE S END CDS 33 7,601 80 02-09-22 ALLONBY CIRCLE STONEHAVEN DR END CDS 33 11,715 85 02-18-22 ALPINE LANE KODIAK MTN END CDS 28 10,993 83 09-17-15
ALEUTIA WAY ELK MOUNTAIN DR END CDS 28 32,973 83 09-17-15 AMBERDALE DR FAIRMONT BL CANYON DR 37 108,373 95 02-09-22 ANDREA CIR VIA MARWAH END CDS 27 8,945 67 03-05-20
ANNA CIRCLE SOUTHVIEW END CDS 27 8,378 69 03-05-20
APPLE ORCHARD DR VALLEY VIEW AVE PONDEROSA WY 37 16,946 81 02-10-22 APPLECROSS LANE CAMINO DE BRYANT END CDS 28 7,997 68 09-17-15 ARBOR GATE LN LAKEVIEW AVE END CDS 33 18,828 86 02-08-22 ARC WAY OHIO ST END OF CDS 33 7,535 95 02-18-22
ARIES DR SANTA FE ST LIBRA PL 33 17,825 80 02-12-22
ARIES DR LESA PL LAVELL DR 33 11,687 80 02-15-22
ARROYO ST VALENCIA AVE MAIN ST 22 13,122 95 02-08-22
ARROYO CAJON E/B KELLOG DR FOXFIELD LANE 23 47,058 95 02-11-22 ARROYO CAJON W/B FOXFIELD LANE KELLOGG 23 50,007 95 02-11-22 ASCOT WY HUMBOLDT LN FAIRPLEX DR 36 8,136 74 03-05-20
ASPENGLOW CIRCLE ASPENGLOW LN END CDS 33 8,690 76 02-15-22 ASPENGLOW LN VALLEY VIEW AVE ASPENGLOW CIRCLE 33 31,850 81 02-15-22 ASPEN WAY SAN ANTONIO RD END OF STREET 33 11,715 61 02-14-22 ASTER LN LUPINE ST END CDS 33 13,508 95 02-09-22
AVOCADO AVE ORIENTE S/S END 30 60,390 69 02-05-22
AVOCADO AVE YORBA LINDA BLVD N/S ORIENTE S/S 23 48,461 80 02-05-22 AVENIDA DE DESPACIO AVENIDA DE MARCIA AVENIDA DE MARCIA 37 83,269 70 09-16-15 AVE DE KRISTINE AVENIDA DE MARCIA END OF CDS 37 27,852 81 09-16-15 AVENIDA DE LAS ESTRELLAS END CDS YORBA LINDA BLVD 33 64,503 79 02-25-22 AVENIDA DE LAS ESTRELLAS CAMINO DE LOS CANTOS YORBA LINDA BLVD 37 21,497 55 03-05-20 AVENIDA DE LA LUZ VISTA DEL SOL END OF CDS 33 28,853 64 02-25-22 AVENIDA DE LOS ARBOLES VIA ROJA VISTA DEL SOL 33 19,635 83 02-25-22 AVENIDA DE LOS ARBOLES VISTA DEL SOL VISTA DEL NORTE 33 30,695 82 02-25-22 AVENIDA DE LOS SUENOS END OF CDS VIA ROJA 33 13,673 74 02-25-22 AVENIDA DEL TREN CAMINO VISTA W/S END OF CDS 26 8,539 75 09-16-15 AVENIDA DEL TREN CAMINO VISTA W/S VIA LEONARDO 33 47,256 68 09-16-15 AVENIDA DE MICHELLE AVENIDA DE MARCIA END OF CDS 37 33,457 78 09-16-15 AVENIDA DE MARCIA VIA LOMAS DE YORBA LA CRESCENTA E/S 37 68,191 76 09-16-15 AVENIDA DE MARCIA LA CRESCENTA E/S VIA LOMAS DE YORBA 33 54,516 76 09-16-15 AVENIDA ADOBE AVENIDA ANTIGUA YORBA LINDA BLVD. 37 32,190 64 03-05-20 AVENIDA ANTIGUA AVENIDA FLORENCIA END CDS 33 61,050 23 03-05-20 AVENIDA BARCELONA ESPERANZA ROAD END CDS 33 25,410 41 03-05-20 AVENIDA DE AMOR PASEO DE LAS PALOMAS END CDS 33 29,381 64 03-05-20 AVE DE LA PAZ EASTSIDE END OF CDS 16 13,261 72 02-22-22 AVENIDA FLORENCIA CALLE DELGADO END CDS 33 28,710 34 03-05-20 AVENIDA GRANADA CALLE ENTRADA AVENIDA BARCELONA 33 19,800 58 03-05-20
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
AVIEMORE DR STONEHAVEN DR END OF CDS 37 86,590 81 02-18-22 AVENIDA ADOBE NEW RIVER YORBA LINDA BLVD 37 67,081 82 02-22-22 AVOLINDA DR AVOCADO AVE END CDS 33 10,142 83 02-05-22
AVOLINDA DR AVOCADO AVE CAMELA LN 33 5,950 70 02-05-22
AVOLINDA DR BOEING AVE END 33 12,738 79 02-08-22
AVOLINDA DR PLUMOSA DR END CDS 33 35,981 69 02-07-22
AVOLINDA DR PLUMOSA DR EUREKA AVE 33 42,075 79 02-07-22 AZELA CIRCLE WOODLAND AVE END OF CDS 33 17,765 83 09-16-15 VIA AZAFRAN PASEO DE LAS PALOMAS VIA MARWAH 48 63,720 57 03-05-20 BEECH AVE MANZANITA AVE PEPPER AVE 27 45,198 70 02-25-22 BELGIAN LN PASO FINO WY CDS 32 17,029 85 02-05-22
BERRYHILL DR BUENA VISTA AVE END CDS 33 32,615 95 02-16-22 BIG HORN MTN WAY CAMINO DE BRYANT END CDS 33 60,599 83 09-17-15 BIG HORN MTN WAY CAMINO DE BRYANT N END CDS 33 8,756 83 09-17-15 BEGONIA DR YORBA RANCH RD JACARANDA LN 33 16,236 56 03-05-20 BIG SPRING DR FAIRMONT BLVD WALNUT CREEK DR 33 7,590 95 02-09-22 BIDWELL DR DRAKE ST END CDS 35 40,291 85 02-11-22
BIG OAK LN SILVER DOLLAR WY VALLEY VIEW CIR 33 19,338 81 02-11-22 BIRCH CIR SMOKETREE END CDS 27 11,051 53 02-11-22
VIA BILBAO AVENIDA EL CID END CDS 33 9,812 76 03-05-20
BLACK PINE CIR FAIRMONT BL END CDS 33 9,878 73 02-24-22 BLUE RIDGE DR BIG HORN MTN END OF CDS 28 48,037 83 09-17-15 BLACKBERRY WAY BAYBERRY WAY ELDERBERRY WAY 33 21,714 83 09-17-15 BLACK FOREST LN FAIRMONT BL END CDS 33 21,197 74 02-24-22 BLACK WALNUT CT SILVER DOLLAR WY CDS 34 20,219 85 02-11-22 VIA BELLA VISTA AVENIDA DEL ESTE END CDS 33 23,045 74 02-03-22 VIA BELLEZA VIA AZAFRAN END CDS 33 10,505 55 03-05-20
BALAN TREE CIRCLE GREENHAVEN ST END OF CDS 33 7,799 67 02-18-22 BLUEBROOK LANE BRUSH CANYON N/S END OF CDS 33 21,923 73 09-17-15 BLUEBERRY ST SHORT ST END OF CDS 33 18,062 94 02-18-22
BLUEFIELD PLAZA OAK MEADOW DR END CDS 33 22,143 95 02-09-22 BLUE GUM DR RIM CREST DR END CDS 37 34,401 77 02-24-22
BLUE GRASS LANE MEADOWLAND DR END OF CDS 33 9,284 68 09-17-15 BLUE MTN DR STONEHAVEN DR END CDS 37 33,050 77 02-18-22 BLUE SPRUCE LN RED PINE RD SILVER MAPLE DR 38 71,592 86 02-09-22 BEN NEVIS WAY KODIAK MOUNTAIN DR END CDS 33 32,219 83 09-17-15 BOEING AVE LA CASITAS AVE ORIENTE DR 33 29,370 70 02-09-22 BRAMBLE CT VALLEY VIEW CIR CDS 38 58,219 89 02-09-22
BRIDLE LN SADDLETREE LN END OF CDS 33 16,148 95 02-28-22 BRETON LN CLYDESDALE DR CDS 32 13,253 79 02-05-22
BRIARHILL DR ORANGE DR END CDS 37 37,176 74 02-15-22
BRIARHILL DR FOLEY DR ORANGE DR 37 42,014 93 02-15-22
BRIARHILL DR LA COLLETTE PL HILLWOOD DR 33 21,851 95 02-24-22 BRIARDALE LN VALLEY VIEW AVE CARLTON PL 33 15,906 61 02-14-22 BRISTLE CONE LN TORREY PINE PL SUGAR PINE DR 33 19,305 95 02-25-22 BRITTANY WAY VILLAGE CENTER DRIVE CHANDLER DRIVE 30 3,750 87 03-05-20 BROOKHILL DR OLD RANCH END CDS 33 49,698 95 02-09-22
BROOKLYN AVE DENVER AVE CASA LOMA AVE 33 8,849 78 02-12-22 BROOKLYN AVE PROSPECT AVE THIRD ST 37 47,693 95 02-11-22 BROOKLYN AVE THIRD ST SECOND ST 37 22,570 79 02-11-22
BROOKLYN AVE SECOND ST VALLEY VIEW AVE 37 22,718 62 02-11-22 BROOKLYN AVE VALLEY VIEW AVE END CDS 28 17,733 84 02-11-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
BROOKMONT DR END CDS CANYON DR 36 53,928 95 02-15-22
BURLEIGH DR MANOR VIEW DR END CDS 33 25,916 95 02-09-22 BRENTWOOD PL MISSION HILLS LN END OF CDS 33 42,845 74 02-23-22 BROOKWAY AVE SAGA DR ORANGE DR 33 17,891 80 02-10-22
BRISBANE WAY DUNROBIN END OF CDS 33 11,825 63 02-18-22
BRUSH CANYON DR CAMINO DE BRYANT E/S MEADOW LAND DR W/S 37 80,262 83 09-17-15 BRUSH CANYON DR MEADOW LAND DR W/S MEADOW LAKE LN W/S 37 81,141 83 09-17-15 BRUSH CANYON DR MEADOW LAKE LN W/S END OF CDS 37 54,917 71 09-17-15 BUCKSKIN CIRCLE SILVER SPURS LN END CDS 33 12,617 78 02-10-22 BUENA VISTA AVE JEFFERSON ST CITY LIMIT 30 27,210 48 02-16-22 BUENA VISTA AVE 100'' E/O MAMMOTH ST RICHFIELD RD 60 147,600 85 02-16-22 BUENA VISTA AVE RICHFIELD RD E HIGHLAND 60 116,400 82 02-16-22 BUENA VISTA AVE E HIGHLAND LAKEVIEW AVE 60 60,720 85 02-16-22 BUENA VISTA AVE LAKEVIEW AVE SCENIC VIEW DR 30 64,800 85 02-16-22 BUENA VISTA AVE SCENIC VIEW DR IMPERIAL HWY 24 22,380 93 02-16-22 BUENA VISTA AVE IMPERIAL HWY GRANDVIEW AVE 27 42,417 90 02-16-22 BURCHIT CIRCLE TORREY PINE PL END CDS 33 14,564 95 02-24-22 BURKWOOD CIRCLE ORANGE GATE DR END CDS 33 15,950 95 02-22-22 BOX CANYON CT VIA LOMAS DE YORBA END OF CDS 37 59,949 74 09-16-15 BAYBERRY WAY BRUSH CANYON DR END OF CDS 33 31,361 71 09-17-15 BYCROFT CIRCLE LANDMARK AVE END CDS 33 9,845 70 02-09-22 CABALLO DR BUENA VISTA AVE END CDS 33 27,060 91 02-16-22 CALGARY AVE RAINTREE ST VAN BUREN ST 33 25,085 95 02-24-22 CALGARY AVE CASA LOMA AVE END CDS 33 22,550 95 02-23-22 CALLE ALCAZAR AVENIDA FLORENCIA END CDS 33 3,630 65 03-05-20 CALLE CUERVO AVENIDA GRANADA END CDS 33 9,900 54 03-05-20 CALLE DELGADO AVENIDA BARCELONA AVENIDA ANTIGUA 33 24,915 65 03-05-20 CALLE ENTRADA ESPERANZA ROAD END CDS 33 22,440 64 03-05-20 CALLE SONORA VIA MARIPOSA AVENIDA ADOBE 33 42,900 64 03-05-20 CALLE VISTA LINDA N END CDS S END CDS 33 31,702 68 03-05-20 CALLE VISTA ALEGRE PASEO DE LA CUMBRE END CDS 34 31,501 67 03-05-20 CAMINO CABRILLO VALLEY VIEW CIR VISTA VIZCAINO 33 12,936 84 02-11-22 CAMINO CERMENON VISTA MORAGA VISTA MENDOZA 33 15,015 70 02-11-22 CAMINO CLARO VIA VALLARTA VIA LAS BRISAS 37 8,325 68 09-17-15 CAMINO GALVEZ CAMINO CERMENON VISTA MENDOZA 33 10,098 77 02-11-22 CAMINO AYALA VISTA VISCAINO END CDS 33 11,627 86 02-11-22 CAMELA ST AVOLINDA DR LA CASITAS AVE 33 13,629 83 02-05-22 CAMELA ST LA CASITAS AVE END CDS 33 14,729 83 02-05-22
CANDLELIGHT LANE MARIPOSA AVE END CDS 33 19,844 80 02-16-22 CARI LN KAYE LN PLUMOSA DR 33 16,929 70 02-09-22
CARLTON PL RIDGEDALE LN BRIARDALE LN 33 6,600 85 02-14-22 CARLOS ROAD PASEO SERRA YORBA RANCH RD. 33 38,940 52 03-05-20 CAROT CT VAN GOGH WAY END OF CDS 33 4,961 83 09-17-15
CARRAIGE CIRCLE WINDMERE DR WINDMERE DR 33 23,743 68 02-16-22 CARRERA RD BASTANCHURY RD CHIANTI CT 55 6,840 77 02-04-22 CARSON WAY VALLEY VIEW CIR FREMONT LN 33 11,192 93 02-09-22 CASCADES AVE REDWOOD ST CITY LIMIT 33 21,549 79 02-16-22 CASA HERMOSA DR CASA ORO DR END CDS 33 22,720 74 02-10-22 CASA LOMA CIRCLE YORBLA LINDA BLVD END CDS 33 7,221 95 02-07-22 CASA ORO DR REGULUS DR END CDS 37 17,991 93 02-15-22
CASA ORO DR EL CAJON AVE END CDS 33 17,501 79 02-10-22
CASA ORO DR EL CAJON AVE ORANGE DR 33 58,849 74 02-15-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
CASA ORO DR HILLWOOD DR LA COLLETTE PL 33 22,011 95 02-23-22 CASSON DR SHANE WAY END 33 13,893 70 02-22-22
CASSON DR CHARMAINE LN END 33 10,890 94 02-25-22
VIA CADIZ E/S VIA SANTANDER END CDS 33 8,129 65 03-05-20 VIA CADIZ W/S VIA SANTANDER VIA CARTAGENA 33 13,007 57 03-05-20 CEDAR AVE EVERGREEN AVE END CDS 34 24,837 78 02-10-22
CHANDLER DRIVE KLINE LANE GALLAL WAY 33 29,370 85 03-05-20 CHARMAINE LN RICH HILL WAY CASSON DR 37 12,488 92 02-25-22 CHICAGO AVE THIRD ST END CDS 33 20,867 59 02-11-22
CHICAGO AVE THIRD ST SECOND ST 37 23,088 76 02-11-22
CHICAGO AVE SECOND ST END CDS 37 22,024 88 02-11-22
CHIANTI CT TRENTINO LN GENOA WY 33 78,474 85 02-04-22
CHANNING LN E/S LINDSEY DR END CDS 33 37,455 89 03-05-20 CHANNING LN W/S LINDSEY DR END CDS 33 29,880 65 03-05-20 CHAPARRAL RIDGE DR RIM CREST DR END CDS 33 14,927 69 02-24-22 CHRISTIE DR CASA LOMA AVE END CDS 33 19,910 80 02-07-22 CHARTER OAKS TERRACE FAIRMONT BLVD END CDS 33 11,825 70 02-14-22 CHESTNUT ST PROSPECT ST SIXTH ST 37 27,898 79 02-12-22
CHESTNUT ST THIRD ST END CDS 33 21,197 68 02-11-22
CHESTNUT ST THIRD ST SECOND ST 33 20,795 81 02-11-22
CHATEAU AVE SINGINGWOOD DR END CDS 33 25,091 65 02-25-22 CHURCHILL DOWNS DR OAKLAWN LN CDS 33 14,860 89 03-05-20 CIRCULO DURANGO PASEO TORTUGA END CDS 33 4,455 69 03-05-20 CIRCULO LOMA PASEO DEL PRADO END CDS 34 3,740 69 03-05-20 CIRCULO NUEVO VIA MARIPOSA END CDS 33 660 84 03-05-20
CIRCULO BAJO PASEO PANORAMA END CDS 33 5,280 72 03-05-20 CIRCULO VISTA PASEO DEL PRADO END CDS 34 6,800 60 03-05-20 CITATION LN SECRETARIAT WY SEABISCUIT RUN 38 11,476 75 02-09-22 CITRUS CIRCLE BASTANCHURY RD END CDS 33 19,514 78 02-14-22 CITRIO DORA AVE SYCAMORE CIRCLE EVERGREEN AVE 34 10,360 82 02-10-22 CLUB TERRACE DR YORBA LINDA BLVD FAIRWAY VIEW 33 28,149 80 02-18-22 VIA CALDERON VIA SANTANDER END CDS 33 11,429 79 03-05-20 CLEVELAND BAY LN PASO FINO WY JUTLAND LN 32 47,936 86 02-04-22 CLEVELAND BAY LN JUTLAND LN CDS 32 14,981 87 02-04-22
CALLE BONITA END OF CDS VIA ROJA 33 12,848 72 02-25-22
CALLE BELLA E/S PASE DEL PRADO END CDS 33 15,851 57 03-05-20 CALLE BELLA W/S PASEO DEL PRADO END CDS 33 7,733 63 03-05-20 CALLE DE LA LADERA PASEO DE LA RAMBLA END CDS 33 19,184 41 03-05-20 CALLE FELIZ AVE DE LAS ESTRELLAS END CDS 33 7,601 57 03-05-20 CALLE MANZANA CALLE TRANQUILLO CAMINO DE LOS CANTOS 33 9,311 77 03-05-20 CALLE PERA PASEO DE LAS PALOMAS END CDS 33 15,922 69 03-05-20 CALLE TRANQUILLO AVENIDA DE LOS REYES END CDS 33 23,771 78 03-05-20 CLOVERDALE WY VALLEY VIEW CIR END CDS 33 34,826 87 02-09-22 CLEAR HAVEN DR HICKORY TREE END CDS 33 15,587 94 02-14-22 CLEARWATER DR GRANBY DR ROANOKE AVE 27 30,240 80 02-22-22 CLOVER HILL DR BUENA VISTA AVE END CDS 33 15,521 91 02-16-22 CLYDESDALE DR BASTANCHURY RD BRETON LN 47 68,714 87 02-04-22 CAMINO CALUROSO VISTA LAMPARA END OF CDS 33 27,797 68 09-16-15 CAMINO DE LOS CANTOS CALLE MANZANA VIA VENTOSA 33 17,000 78 03-05-20 CAMINO TECATE VIA NUEVA END OF CDS 33 21,263 68 09-17-15 CAMINO BESAR VIA BUENA SUERTE END OF CDS 33 23,012 64 09-17-15 CAMINO DE BRYANT BRUSH CANYON DR LA PALMA AVE 38 38,596 81 09-17-15
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
CAMINO DE BRYANT KODIAK MTN END CDS 33 35,981 83 09-17-15 CAMINO DE BRYANT KODIAK MTN N/S MAIDEN MOOR N/S 33 74,788 83 09-17-15 CAMINO DE BRYANT MAIDEN MOOR N/S PASEO DE TORONTO N/S 33 68,277 83 09-17-15 CAMINO DE BRYANT PASEO DE TORONTO BRUSH CANYON DR 38 80,940 83 09-17-15 CAMINO DORADO VIA MELINDA VIA LAS BRISAS 33 23,732 68 09-17-15 CAMINO FAMOSA VIA MELINDA VIA LAS BRISAS 37 26,955 68 09-17-15 CAMINO PONIENTE VIA BUENA SUERTE END OF CDS 33 15,719 65 09-17-15 CAMINO VISTA VIA LENARDO AVENIDA DEL TREN 33 31,482 68 09-16-15 CAMPHOR E/S MANZANITA AVE END CDS 33 17,204 64 02-25-22 CAMPHOR W/S MANZANTIA AVE END CDS 33 34,826 65 02-25-22 CAMAROSA DR LA TIERRA LN FAIRMONT BL 36 12,420 95 02-02-22 CANDLE BERRY LANE BRUSH CANYON DR END OF CDS 33 8,921 70 09-17-15 CONDOR RIDGE RD FAIRMONT BLVD END CDS 33 44,764 68 02-14-22 COUNTRY VIEW DR END CDS ACACIA HILL DR 33 85,745 95 02-28-22 CANYON DRIVE BROOKMONT DR FAIRMONT BLVD 33 97,812 95 02-09-22 CANYON TERRACE DR FAIRMONT BLVD END OF CDS 27 16,721 58 02-24-22 COBBLESTONE CT QUIET MEADOW LN END CDS 33 7,443 86 02-08-22 COACHWOOD LN FAIRMONT BLVD END OF CDS 37 21,321 92 02-28-22 COLONIAL CT SPYGLASS HILL CDS 33 9,251 78 02-05-22
COMPASS CIR BASTANCHURY END CDS 37 15,947 83 02-15-22
CONGRESSIONAL CT SPYGLASS HILL CDS 33 8,657 78 02-05-22 CONNEMARA CT BRETON LN CDS 32 34,277 81 02-05-22
CORTONA CT E CDS W CDDS 33 57,970 94 02-04-22
CORALWOOD CIRCLE CASA ORO DR END CDS 37 8,149 69 02-10-22 COUPLES CT HOGAN DR CDS 33 9,482 84 02-08-22
COVENTRY LN RAINTREE ST END CDS 33 24,827 70 02-24-22
CAPRICE DR MANOR VIEW END CDS 33 26,741 95 02-09-22
CIRCULO DEL SOL PASEO DE LA RAMBLA END CDS 33 10,571 64 03-05-20 CARDIFF DR HEATHERIDGE DR END CDS 31 14,314 50 02-18-22 CORDOVA LN FAIRMONT BLVD MARSALA DR 48 7,680 69 02-02-22 CRESTA BELLA AVE EL CAJON AVE END CDS 33 12,221 54 02-10-22 CRESCENT DR MISSION HILLS END OF CDS 33 17,732 69 02-23-22 CRESTKNOLL DR CANYON DR CITY BOUNDARY 36 31,464 95 02-28-22 VIA CARTAGENA VIA CADIZ VIA CRISTAL 33 15,708 55 03-05-20 VIA CARTAGENA VIA CRISTAL END CDS 33 21,659 76 03-05-20 CRYSTAL DR MIRAGE ST BRIDGE @ WEIR CANYON 61 51,240 73 02-17-22 CASIANO DR RAVENNA VERONA LN 36 16,124 63 02-02-22
CASA LOMA AVE BASTANCHURY RD S/S IMPERIAL HWY S/S 33 38,625 76 02-07-22 CASA LOMA AVE BROOKLYN AVE BASTANCHURY RD 33 38,016 76 02-12-22 CASA LOMA AVE YORBA LINDA BLVD IMPERIAL HWY 37 97,310 80 02-07-22 CASA LOMA AVE YORBA LINDA BLVD CALGARY AVE 33 38,384 95 02-23-22 CASA LOMA AVE END END CDS 33 20,174 95 02-22-22
CASINO RIDGE RD SAN ANTONIO RD END OF ROAD 33 3,597 83 02-03-22 CASSIA LN PEPPER AVE END CDS 27 37,700 63 02-25-22
CASTLE BEND WAY KODIAK MTN END OF CDS 28 20,468 83 09-17-15 CASTLE ROCK RD TIMBERRIDGE RD END CDS 33 28,627 68 02-14-22 COTTONWOOD RD E/S HICKORY END CDS 33 26,713 67 03-05-20 COTTONWOOD RD W/S HICKORY END CDS 33 16,417 72 03-05-20 CUMBERLAND CIRCLE KINGSPORT DR JEFFERSON ST 33 36,675 70 02-16-22 CUMBERLAND CIRCLE JEFFERSON ST END CDS 33 26,378 83 02-16-22 DAISY CIRCLE CAMINO DE BRYANT END CDS 28 7,101 83 09-17-15 DAPPLE GRAY LN STEEPLECHASE WY SHETLAND LN 32 11,968 94 02-05-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
D BAGLIO WAY GRANBY DR END CDS 35 25,756 79 02-22-22
DEBI LN EUREKA LN END CDS 33 24,860 80 02-07-22
DEODAR DR VILLAGE CENTER DR END CDS 33 76,175 62 02-25-22 DEERFOOT LANE ARROYO CAJON END CDS 33 11,825 95 02-11-22 VIA DE LA LUNA N/S AVENIDA PUESTA DEL SOL END CDS 33 28,985 92 02-03-22 VIA DE LA LUNA S/S AVENIDA PUESTA DEL SOL END CDS 33 19,255 82 02-03-22 VIA DE LA MULA VIA DON QUIJOTE VIA DON JUAN 33 18,513 71 02-24-22 VIA DE LA PLAZA N/S AVENIDA DEL RAY END CDS 33 20,174 69 02-04-22 VIA DE LA PLAZA S/S AVENIDA DEL RAY END CDS 33 28,523 86 02-04-22 VIA DEL CONEJO VIA DEL CAZADOR VIA DEL COYOTE 34 25,500 67 03-05-20 VIA DEL GANADERO AVENIDA DEL NORTE END CDS 33 16,412 70 02-02-22 VIA DEL OBISPO VIA TRINIDAD END OF CDS 33 10,967 65 02-24-22 VIA DE LAS MONTANAS AVENIDA DE LAS FLORES END CDS 27 1,485 69 02-04-22 VIA DE LOS ROBLES AVENIDA DEL NORTE END CDS 33 17,633 70 02-02-22 AVENIDA DE LOS REYES VIA VENTANA END CDS 33 37,301 70 03-05-20 AVENIDA DE LAS FLORES PUESTA DEL SOL 345'' N OF PUESTA DEL SOL 36 12,920 58 02-04-22 AVENIDA DE LAS FLORES 345 N OF PUESTA DEL SOL AVENIDA DEL NORTE 36 85,104 63 02-04-22 DIAMOND HILL SPYGLASS HILL OYSTER BAY 33 8,085 84 02-05-22 DIEMER RD VALLEY VIEW CIR E/S CITY LIMITS 50 16,350 91 02-09-22 VIA DL BUEY VIA LA MANCHA END OF STREET 33 52,800 76 02-24-22 DELACROIX WAY CAMINO DE BRYANT PICASSO DR 33 37,125 83 09-17-15 AVENIDA DEL ESTE PUESTA DEL SOL AVENIDA RIO DEL ORO 30 62,840 69 02-03-22 AVENIDA DEL NORTE AVENIDA DE LAS FLORES VIA ALEGRE 36 29,264 70 02-02-22 AVENIDA DEL NORTE VIA ALEGRE AVENIDA RIO DEL ORO 36 9,576 83 02-02-22 VIA DEL PALMAR VIA BRUMOSA VIA MARWAH E/S 33 8,811 71 03-05-20 VIA DEL PALMAR VIA MARWAH W/S VIA PRIMARIA 33 16,995 68 03-05-20 VIA DEL PRADO N/S AVENIDA DEL REY END CDS 33 22,649 70 02-04-22 VIA DEL PRADO S/S AVENIDA DEL REY END CDS 33 26,939 71 02-04-22 VIA DEL RANCHO PUESTA DEL SOL END CDS 33 22,022 89 02-04-22 AVENIDA DEL REY AVENIDA RIO DEL ORO VIA DE LA PLAZA 54 24,948 58 02-02-22 AVENIDA DEL REY VIA DE LA PLAZA AVENIDA DE LAS FLORES 33 16,137 71 02-02-22 AVENIDA DEL REY FAIRMONT BLVD AVENIDA DE LAS FLORES 27 4,779 45 02-02-22 AVENIDA DE LOS ARBOLES YORBA LINDA BLVD VIA ROJA 33 5,577 63 02-25-22 VIA DEL VALLE AVENIDA DEL ESTE END CDS 36 36,485 69 02-03-22 VIA DON JUAN VIA DE LA MULA VIA DEL BUEY 33 16,137 71 02-24-22 VIA DON QUIJOTE VIA DEL BUEY VIA DE LA MULA 33 12,941 70 02-24-22 DUNROBIN WAY STONEHAVEN DR END OF CDS 37 67,960 72 02-18-22 DUNSMUR PLAZA OAKMEADOW DR END CDS 33 18,612 95 02-09-22 DENVER AVE BASTANCHURY RD BROOKLYN AVE 33 38,021 88 02-15-22 DOMINGUEZ RANCH ROAD TRAILSIDE DRIVE YORBA RANCH ROAD 34 133,960 48 03-05-20 DOMINGUEZ RANCH ROAD TRAILSIDE DRIVE ESPERANZA ROAD 34 78,200 69 03-05-20 DORTHEA ST LA CASITAS AVE CITY LIMIT 33 57,931 70 02-09-22 DRAKE ST 496'' W/O VALLEY VIEW CIR END CDS 27 27,494 89 02-11-22 DRAKE ST VALLEY VIEW CIR 496'' W/O VALLEY VIEW CIR 33 16,368 88 02-11-22 DORAL CT WAGON WHEEL END CDS 33 7,205 95 02-28-22
DORINDA RD END OF CDS FELIPA RD 33 57,502 69 02-15-22
DORINDA RD FELIPA RD YORBA LINDA BLVD 33 34,226 60 02-15-22 DUNMURRY LN LAKEVIEW AVE JOEL BRATTAIN DR 37 7,770 81 02-07-22 DURHAM DR RUTLAND DR WESTMORELAND DR 33 13,563 65 02-16-22 DEVENPORT STONEHAVEN END CDS 33 13,244 71 02-18-22
DEVERON COVE AVIEMORE DR END OF CDS 33 41,789 86 02-18-22 EASTPARK DRIVE OLD CANAL ROAD 1000'' E/O OLD CANAL RD. 48 48,000 59 02-17-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
EUCALYPTUS HILL RD END OF CDS END OF ROAD 33 13,409 95 02-18-22 EDGEWOOD LN VALLEY VIEW CIR 700'' E/O VALLEY VIEW CIR 33 23,100 85 02-09-22 EDGEWOOD LN 700'' E/O VALLEY VIEW CIR END CDS 33 21,791 83 02-09-22 EAGLES NEST DR FAIRMONT BLVD END CDS 33 32,252 56 02-14-22 EL CAJON AVE PROSPECT AVE LA PAZ AVE 33 34,650 84 02-12-22 EL CAJON AVE LA PAZ AVE RUSTIC AVE 33 37,785 69 02-12-22 EL CAJON AVE RUSTIC AVE VALLEY VIEW AVE 33 16,632 68 02-12-22 EL CAJON AVE ROSE DR MIMOSA DR 33 17,820 82 02-10-22
EL CAJON AVE MIMOSA DR VISTA RANCH 33 9,471 70 02-10-22 AVENIDA EL CID PASEO DE LAS PALOMAS VIA AUGUSTO 33 67,439 50 03-05-20 ELDERBERRY LANE BLACKBERRY WAY END OF CDS 33 11,693 71 09-17-15 ELK MTN DR SMOKEY MTN CAMINO DE BRYANT 33 75,636 80 09-17-15 ELMHURST CIRCLE CASA LOMA AVE END CDS 33 23,738 83 02-07-22 VIA EL MOLINO N/S AVENIDA DEL RAY END CDS 33 23,507 70 02-04-22 VIA EL MOLINO S/S AVENIDA DEL RAY END CDS 33 21,527 56 02-04-22 EARLY STAR WAY EVENING BREEZE DR END OF CDS 33 14,861 68 09-17-15 ERNEST JOHNSON JOHN BIXBY END OF CDS 33 12,485 81 09-17-15 EAST HILL DR VILLAGE CENTER SOUTH VIEW DR 33 13,271 85 03-05-20 EAST SIDE CIRCLE ESPARANZA RD END OF CDS 37 59,838 71 02-22-22 EUREKA AVENUE YORBA LINDA BLVD. S END 25 19,250 95 02-23-22 EUREKA AVENUE MARK LN BASTANCHURY RD 26 19,838 80 02-07-22 EUREKA AVENUE IMPERIAL HWY N/S MARK N/S 36 45,972 79 02-07-22 EUREKA AVENUE IMPERIAL HWY YORBA LINDA BLVD 36 62,676 76 02-07-22 EVERGREEN AVE CITRIO DORA AVE CEDAR AVE 34 11,006 81 02-10-22 EVENING BREEZE DR S/S BRUSH CANYON DR END OF CDS 33 75,416 73 09-17-15 FALABELLA LN OLDENBURG LN CDS 32 19,525 94 02-05-22
FALLEN LEAF ROAD SINGINGWOOD DRIVE E END CDS 33 16,346 78 02-25-22 FELICIA DR AVENIDA RIO DEL ORO LUPINE ST 33 65,010 95 02-09-22 FALCONRIDGE RD RIM CREST DR END CDS 33 11,858 73 02-24-22 FLORENCE RD CORTONA CT CDS 33 31,856 94 02-04-22
FELIPA RD DORINDA RD SAN ANTONIO RD 33 42,938 65 02-15-22 FLORA DR LAKEVIEW DR END OF CDS 33 39,055 83 02-18-22
FOLEY DR SANTA FE ST END 33 15,180 80 02-12-22
FOLEY DR SANTA FE ST BRIARHILL DR 33 16,170 70 02-12-22 FOURTH ST MARDA AVE BROOKLYN AVE 33 9,872 69 02-11-22
FOXTAIL DR LOTUS AVE VIA LOMAS DE YORBA 33 57,896 82 09-16-15 FIR CREST DR TAMMARISK DR PEBBLE BEACH LANE 33 8,090 95 02-28-22 FREMONT LN CARSON WAY END CDS 33 30,041 92 03-05-22
FAIRLYNN BLVD BROOKMONT DR CRESTKNOLL 37 30,303 95 02-28-22 FAIRMONT BLVD SAN ANTONIO EAGLES NEST S/S 37 72,890 69 02-14-22 FAIRMONT BLVD EAGLES NEST S/S SHADOW OAK S/S 37 72,853 69 02-14-22 FAIRMONT BLVD SHADOW OAK VILLAGE CENTER S/S 37 28,485 72 02-14-22 FURNACE CREEK RD WALNUT CREEK RD FAIRMONT BLVD 33 44,098 95 02-09-22 FERN CIR SMOKETREE AVE END CDS 27 13,859 70 02-11-22
VIA FRONDOSA S/S AVENIDA PUESTA DEL SOL END CDS 33 10,967 70 02-03-22 VIA FRONDOSA N/S AVENIDA PUESTA DEL SOL END CDS 33 24,233 69 02-03-22 FERN GLEN DR AMBERDALE DR CANYON DR 33 58,905 95 02-09-22 FERNWOOD PLAZA OAK MEADOW DR END CDS 33 18,150 95 02-09-22 FOREST AVE FAIRMONT BLVD END CDS 33 19,057 64 02-24-22
FOREST GLEN RD RIM CREST DR END CDS 29 25,413 67 02-02-22 FAIRWOOD CIRLCE HIDDEN HILLS RD END OF CDS 33 21,461 78 02-22-22 FEATHER AVE GRANDBY CIR ROANOKE AVE 27 39,366 83 02-22-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
FEATHER GRASS LANE BRUSH CANYON DR END OF CDS 33 22,253 71 09-17-15 FUTURA DR FAIRMONT BLVD END CDS 33 24,794 95 02-09-22
FOX FIELD LN ARROYO CAJON DR PARKSIDE DR 33 37,356 95 02-11-22 FOX HOLLOW DR SHADOW OAK DR FAIRMONT BLVD 33 26,235 68 02-25-22 GALWAY BAY RD REDCASTLE ST JOEL BRATTAIN DR 33 14,190 81 02-07-22 GALLAL WAY CHANDLER DRIVE THAGARD WAY 33 25,905 87 03-05-20 GARDENIA LN JASMINE WY SOUTH CDS 32 59,429 88 02-09-22
GARDENIA LN JASMINE WY NORTH CDS 32 26,405 88 02-09-22
GARDEN PL IMPERIAL HWY END CDS 27 20,650 93 02-07-22
GENOA WY CHIANTI CT CDS 33 65,747 94 02-04-22
GLASGOW CIRCLE VAN BUREN ST END CDS 33 12,980 95 02-24-22 GLENDALE DR LARKRIDGE DR CRESTKNOLL DR 36 15,768 95 02-28-22 GLENDALE DR CRESTKNOLL DR CANYON DR 36 15,768 95 02-28-22 GLEN HAVEN DR FERNGLEN DR FAIRMONT BLVD 33 34,919 95 02-09-22 GLEN PL FERNGLEN DR END CDS 33 11,726 95 02-09-22
GLARAMARA CIR CAMINO DE BRYANT END CDS 33 7,601 68 09-17-15 GLOXINIA DR N/S JACARANDA LN END CDS 33 23,936 59 03-05-20 GLOXINIA DR S/S JACARANDA LN BEGONIA DR 33 28,710 44 03-05-20 GOLDEN AVE ROSE DR 472'' W/O ROSE DR 60 28,320 93 02-15-22 GOLDEN AVE 472'' W/O ROSE DR E/S OF BRIDGE 40 24,080 93 02-15-22 GOLDEN WILLOW CT BLUE SPRUCE LN CDS 33 7,468 85 02-09-22 GOLDEN MAPLE LN SUGAR PINE DR SCOTCH PINE RIDGE 33 18,117 84 02-25-22 GOLDEN POPPY WY BRAMBLE CT CDS 33 26,740 91 02-09-22
GORDON LN GRANDVIEW AVE END OF CDS 37 22,727 90 02-18-22 GREEN PINE WAY SUGAR PINE DR TORREY PINE PL 33 20,503 95 02-25-22 GREENWICH CIRCLE CARRAIGE CIR END CDS 33 24,629 57 02-16-22 GRANBY DR END CDS AVENIDA ADOBE AVE 35 66,951 70 02-22-22 GREEN CREST E/S SKY RIDGE END OF CDS 26 34,799 77 02-22-22 GREEN CREST W/S SKY RIDGE HIDDEN HILLS 28 60,844 78 02-22-22 GRANADA DR SIENNA LN LOMBARDY LN 36 25,700 68 02-02-22
GRANADA DR LA TIERRA LN END CDS 33 17,237 95 02-02-22
GRAND VIEW AVE MOUNTAIN VIEW AVE BUENA VISTA AVE 37 25,900 71 02-18-22 GRAND VIEW AVE BUENA VISTA AVE LINDA VERDE ST 27 17,064 77 02-18-22 GRAND VIEW AVE LINDA VERDE ST KELLOGG DR 27 57,753 78 02-18-22 GRAND VIEW AVE MOUNTIAN VIEW AVE GORDON LN 33 38,082 95 02-18-22 GRAND VIEW AVE GORDON LN DEE LN 33 10,956 95 02-18-22
GREEN HOLLOW LN BRUSH CANYON DR END OF CDS 33 14,960 73 09-17-15 GREENHAVEN ST DEVERON COVE AVIEMORE DR 37 38,998 71 02-18-22 GREEN LEAF PLAZA OAK MEADOW DR END CDS 33 17,886 95 02-28-22 GREEN MEADOW WAY MEADOWLAND LANE END OF CDS 33 25,850 68 09-17-15 GREEN MOUNT PL HIDDEN HILLS END OF CDS 26 21,103 75 02-22-22 GROWERS CIRCLE END CDS END CDS 33 27,742 76 02-24-22
GREY STONE DR BASTANCHURY RD END CDS 33 18,953 63 02-10-22 GYPSUM CANYON ROAD SOUTHSIDE OF BRIDGE CENTER OF 91 FWY 56 40,656 53 02-17-22 HARLAN DR VINDWOOD LN END CDS 33 17,501 81 02-09-22
HARVEST WAY END CDS END CDS 33 35,530 85 02-24-22
HIBISCUS CIR FELICIA DR END CDS 27 5,948 95 02-09-22
HICKORY DR ESPERANZA END CDS 33 14,723 69 03-05-20
HICKORY TREE LN VIEW PARK DR END CDS 37 20,063 91 02-14-22 HIDDEN GLEN LN HIDDEN HILLS RD END OF CDS 26 11,165 85 02-22-22 HIDDEN HILLS RD ENT/HIDDEN HILLS EST MISSION HILLS 26 63,050 68 02-22-22 HIDDEN HILLS RD MISSION HILLS HIDDEN HILLS ESTATES S/B 26 63,050 37 02-22-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
HIDDEN HILLS RD MISSION HILLS STONE WOOD 37 66,228 74 02-22-22 HIDDEN HILLS RD STONEWOOD CUL DE SAC- END 37 46,509 72 02-22-22 HIDDEN HILLS RD CDS HIGH TREE 39 61,659 76 02-22-22
HIDDEN HILLS RD HIGHTREE CIR GREEN CREST N/S 36 61,344 76 02-22-22 HIDDEN HILLS RD GREEN CREST END 36 43,920 80 02-22-22
HEIDI CIRCLE CASA LOMA AVE END CDS 33 30,491 81 02-07-22 HEIDI CIRCLE HEIDI CIRCLE S S END CDS 33 825 70 02-07-22 HIGH TREE CIR HIDDEN HILLS END OF CDS 26 20,915 63 02-22-22 HIGHLAND AVE MOUNTAIN VIEW AVE END 24 29,712 95 02-16-22 HIGHLAND AVE BUENA VISTA AVE MARIPOSA AVE 30 89,400 78 02-16-22 HIGHLAND AVE BUENA VISTA AVE LONG VIEW DR 36 36,972 74 02-16-22 HIGHLAND AVE LONG VIEW DR END CDS 36 12,869 86 02-16-22 HILLCREST CIRCLE PROSPECT AVE END CDS 33 16,775 79 02-10-22 HILLWOOD PL VAN BUREN ST END CDS 33 10,010 95 02-23-22
HILLWOOD DR BRIARHILL DR VAN BUREN ST 33 15,972 95 02-24-22 HILLWOOD DR JEFFERSON ST END CDS 37 14,476 95 02-24-22
HILLCOCK VIEW PLAZA RIDGEWOOD PL END CDS 33 23,044 95 02-09-22 HILLSIDE DR CANYON DR RIVERVIEW DR 33 31,977 95 02-28-22 HILLTOP PL HILLSIDE DR END CDS 33 10,901 95 02-28-22
HOLLY BERRY LANE MULBERRY LANE END OF CDS 33 13,541 81 09-17-15 HANNAH CIR VIA MARWAH END CDS 27 10,268 64 03-05-20
HOGAN DR LAKEVIEW AVE CDS 33 28,325 69 02-05-22
HOLLY CIRCLE HIGHLAND AVE END CDS 33 16,841 89 02-18-22 HOMESTEAD AVE LAKEVIEW AVE SPYGLASS HILL 37 11,137 80 02-05-22 HOOSIER LAWN WY OAKLAWN LN CDS 33 28,951 89 03-05-20
HERBSHEY CIR LINDSEY CIR END CDS 33 35,981 86 03-05-20
HEATHER WAY HIGHLAND AVE LAKEVIEW AVE 33 35,706 84 02-18-22 HEATHERIDGE DR STONEHAVEN DR HEATHRIDGE DR 31 77,605 64 02-18-22 HEATHERWOOD LN DEVERON COVE GREEN HAVEN ST 37 28,583 87 02-18-22 HUGGINS AVE ROSE DR JEANEAN LN 33 23,780 86 02-15-22
HUMBOLDT LN BASTANCHURY RD CDS 33 43,504 66 03-05-20
IRONBARK WY LINDEN WY SWEET BAY CT 33 9,900 80 02-11-22 IRON STONE DR CAMINO DE BRYANT END CDS 28 17,013 77 09-17-15 IVY CIRCLE GLOXINIA DR END CDS 33 8,195 62 03-05-20
JASMINE WY GARDENIA LN PRIMROSE LN 33 16,599 93 02-09-22 JAY ST CALGARY AVE KENNON DR 33 10,466 95 02-25-22
JAY ST RIDGECREST DR SONOMA WAY 33 10,791 95 02-22-22
JACARANDA LN BEGONIA DR YORBA RANCH RD 33 43,593 70 03-05-20 JEANEAN LN END CDS END 33 29,513 79 02-15-22
JEFFERY DR JENNIFER DR END CDS 33 11,797 72 02-14-22
JEFFERSON ST YORBA LINDA BLVD CITY LIMIT 37 37,000 95 02-24-22 JEFFERSON ST CITY LIMIT BUENA VISTA AVE 37 37,518 73 02-24-22 JENNIFER DR LA CONCETTA DR JEFFERY DR 33 8,019 65 02-14-22 JENNIFER DR LA CONCETTA DR VALLEY VIEW 33 6,633 74 02-14-22 JOHN BIXBY RANCHO SANTA ANA ERNEST JOHNSON 33 7,819 83 09-17-15 JUNIPER AVE DEODAR DR END CDS 33 40,997 60 02-11-22
JOANNE WAY CALLE SONORA END CDS 33 4,950 64 03-05-20
JOEL BRATTAIN DR W CDS E CDS 37 83,564 83 02-07-22
JOSHUA DR EUREKA AVE END CDS 33 27,670 81 02-08-22
JUSTIN WAY VIA MARWAH END CDS 33 14,096 81 03-05-20
JUTLAND LN MORGAN CT CDS 32 36,901 86 02-04-22
KAYE LN MOLLIE LN CARI LN 33 31,322 70 02-09-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
KODIAK MOUNTAIN DR CAMINO DE BRYANT MT. TRUMPH S/S 33 102,681 83 09-17-15 KODIAK MOUNTAIN DR MT. TRUMPH S/S CAMINO DE BRYANT 33 52,173 83 09-17-15 KILLYMOON CIR LAKEVIEW AVE JOEL BRATTAIN DR 37 14,652 84 02-07-22 KIND WY JOEL BRATTAIN DR CDS 33 10,901 84 02-07-22
KINGSPORT DR CARRIAGE CIR CUMBERLAND CIR 33 6,600 69 02-16-22 KLINE LANE CHANDLER DRIVE END CDS 25 19,125 89 03-05-20 KINGSBRIAR DR BROOKMONT DR PARKVIEW 33 67,320 92 02-09-22 KINGSBRIAR DR PARKVIEW RIDGEWOOD PL 33 33,264 95 02-09-22 KENNON DR WOODCREST DR CASA LOMA AVE 33 8,283 95 02-23-22 KENNON DR JAY ST RICHFIELD RD 33 16,863 95 02-23-22
KONA KOVE WAY SAGA DR END CDS 33 13,673 80 02-15-22
KRUEGER ST BASTANCHURY RD OAKLAWN LN 36 4,608 89 03-05-20 LA CASITAS AVE AVOCADO AVE DORTHEA ST 33 16,439 81 02-09-22 LA CASITAS AVE AVOCADO AVE BOEING AVE 33 25,349 69 02-09-22 LA CADENA CIR LA ENTRADA END CDS 33 14,003 84 02-07-22
LA COLLETTE PL VAN BUREN ST E END CDS 33 11,726 95 02-23-22 LA COLLETTE PL VAN BUREN ST W END CDS 33 26,213 95 02-23-22 LA COLLETTE PL SANTA FE ST END CDS 33 8,789 95 02-23-22 LA COLLETTE PL JEFFERSON ST END CDS 37 14,550 95 02-24-22 LA CONCETTA DR BASTANCHURY RD JENNIFER DR 33 27,390 79 02-14-22 LA CONCETTA DR JENNIFER DR END CDS 33 15,125 61 02-14-22 LA CRESCENTA AVE DE MARCIA AVE DE MARCIA 37 48,267 73 09-16-15 LA CUESTA CIR LA ENTRADA END CDS 33 12,749 87 02-07-22
LADERA CIRCLE CASA LOMA AVE END CDS 33 13,013 83 02-07-22 LA ENTRADA DR CASA LOMA AVE END CDS 27 38,875 79 02-07-22 LA ENTRADA DR EUREKA AVE CASA LOMA AVE 33 42,108 81 02-07-22 LA FIESTA AVENIDA DE DESPACIO END CDS 26 21,970 81 09-16-15 LA GRANDE AVENIDA DE MARCIA END OF CDS 33 12,089 78 09-06-15 VIA LA GRANJA VIA DEL PALMAR END CDS 33 15,521 55 03-05-20 LA HOMA LA CRESCENTA END OF CDS 33 15,587 79 09-16-15
LA KENICE WAY SANTA FE ST TORIDA WAY 33 9,641 95 02-24-22 LA KENICE WAY JEFFERSON ST END CDS 37 14,846 95 02-24-22 LAMPLIGHT LN OHIO ST END CDS 24 15,906 82 02-05-22
LANCER DR JEFFERSON ST END CDS 37 14,698 95 02-24-22
LANDIG CIRCLE GALLAL WAY END CDS 33 17,490 88 03-05-20
LANDMARK AVE ROSE DR WINTERHAVEN ST 33 31,383 74 02-09-22 LANTANTA DR HIGHLAND AVE END CDS 33 20,707 66 02-18-22
LA PAZ CIRCLE EL CAJON AVE END CDS 33 11,000 82 02-10-22 VIA LA PRIMAVERA AVENIDA PUESTA DEL SOL END CDS 33 25,256 89 02-03-22 VIA LA QUINTA AVENIDA PUESTA DEL SOL END CDS 33 22,649 91 02-03-22 LA TIERRA LN ORLANDO DR GRANDA DR 36 20,588 95 02-02-22 LAVENDER DR VALLEY VIEW CIR GARDENIA LN 38 49,590 91 02-09-22 LAVELL DR ARIES DR SAGA DR 33 12,870 82 02-15-22
LAWNDALE PL VAN BUREN ST WEBB PL 33 15,048 95 02-23-22
LINDSEY DR ESPERANZA RD CHANNING LN 33 16,896 40 03-05-20 LESA PL SAGA DR ARIES DR 33 12,644 81 02-15-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
LEAFY MEADOWN LANE BRUSH CANYON DR END OF CDS 33 9,680 69 09-17-15 LOGANBERRY LN BLACKBERRY WAY END OF CDS 33 7,139 81 09-17-15 LIBRA PL ARIES DR END CDS 33 17,237 80 02-12-22
LINDEN LN VALLEY VIEW CIR IRONBARK WY 33 8,052 80 02-11-22 LINDA VISTA ST YORBA LINDA BLVD YORBA PL 27 7,830 94 02-15-22 LIPIZZAN LN CLYDESDALE DR OLDENBURG LN 31 17,174 94 02-05-22 LIVORNO WY CHIANTI CT CDS 33 23,144 95 02-04-22
LIVERPOOL ST ORANGE DR YORBA LINDA BLVD 37 47,138 74 02-10-22 LIVERPOOL ST YELLOWSTONE AVE CALGARY AVE 33 27,918 95 02-24-22 LIVERPOOL ST BUENA VISTA AVE MELBOURNE LN 33 4,422 95 02-24-22 LAKEHAVEN WAY SHORT ST END OF CDS 33 16,181 95 02-18-22 VIA LOMA LINDA N/S AVENIDA DEL ESTE AVENIDA PUESTA DEL SOL 33 29,304 71 02-03-22 VIA LOMA LINDA S/S AVENIDA PUESTA DEL SOL END CDS 33 7,634 70 02-03-22 LOMBARDY LN GRANADA ORLANDO DR 36 23,400 62 02-02-22
LEMON DRIVE IMPERIAL HWY W/S EUREKA AVE 26 17,524 70 02-08-22 LEMON DRIVE LAKEVIEW W/S MAIN ST 38 28,994 95 02-08-22
LEMON DRIVE MAIN ST IMPERIAL E/S 38 28,690 85 02-08-22
LE MANS CIR MANOR VIEW DR END CDS 33 18,458 95 02-09-22 LANCEWOOD PLAZA OAK MEADOW DR END CDS 33 18,183 95 02-28-22 LINDA VERDE N/S GRAND VIEW N/S OHIO ST 37 28,725 95 02-18-22 LONGBAY DR END CDS END CDS 33 63,877 88 03-05-20
LOGANVIEW DR AVOLINDA DR END CDS 33 15,785 84 02-07-22
LOGANLINDA DR CARI LN AVOLINDA DR 33 22,275 70 02-09-22 LOIE ST ROSE DR END CDS 33 28,391 78 02-10-22
LONCREST CIRCLE HUGGINS AVE END CDS 33 7,238 85 02-15-22 LONG VIEW DR E/S HIGHLAND AVE END CDS 33 16,148 86 02-16-22 LORI LN SUNNY LN KAYE LN 33 10,857 70 02-09-22
LOS ANGELES SECOND ST IMPERIAL HWY 27 13,095 82 02-11-22 LOS ANGELES PROSPECT AVE END CDS 37 27,685 68 02-10-22
LOS PALOMINOS OHIO ST SILVER SPURS LN 33 13,893 84 02-05-22 LOTUS AVE SLEEPING OAK DR FOX TAIL DR 33 20,856 82 09-16-15 LUPINE ST AVENIDA RIO DEL ORO END CDS 33 68,981 95 02-09-22 LORCA LN FAIRMONT BLVD ORLANDO DR 33 4,719 95 02-02-22
LAUREL VIEW DR LAKEVIEW END OF CDS 33 25,553 80 02-18-22 LARKFIELD DR KINGSBRIAR DR OAK MEADOW DR 33 8,250 95 02-28-22 LARKFIELD DR OAKMEADOW DR END CDS 33 15,048 95 02-28-22 LARKRIDGE DR CITY BOUNDARY GLENDALE DR 36 5,436 95 02-28-22 LAUREL VIEW CIRCLE LAUREL VIEW DR END CDS 33 11,561 85 02-18-22 LOS ESTADOS PASEO DE TORONTO END OF CDS 33 52,712 72 09-16-15 LOS MONTEROS VIA LOMAS DE YORBA PASEO DE TORONTO 37 86,802 67 09-16-15 LOS ADORNOS LOS MONTEROS END OF CDS 37 38,656 82 09-16-15 LAS PATRANAS LOS MONTEROS END OF CDS 37 33,161 72 09-16-15 LOS RIOS PASEO DE TORONTO END OF CDS 33 26,411 80 09-16-15
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
LITTLE CANYON LN FAIRMONT BLVD END CDS 31 16,887 64 02-14-22 LIVE OAK LN DEODAR DR END CDS 27 48,041 60 02-11-22
LYNNBROOK PZ END CDS END CDS 33 51,579 95 02-09-22
MAJESTIC CYPRESS WAY VAN BUREN ST SUGAR PINE DR 33 23,628 89 02-25-22 MALAGA LN END CDS END CDS 33 28,402 68 02-02-22
MAMMOTH ST CASCADES AVE BUENA VISTA AVE 33 4,884 88 02-16-22 MANDARIN LN PLUMOSA DR END CDS 33 20,141 61 02-07-22
MARDA AVE VALLEY VIEW AVE SECOND ST 37 22,829 92 02-11-22 MARDA AVE SECOND ST FOURTH ST 37 47,471 81 02-11-22
MARIPOSA AVE HIGHLAND AVE LAKEVIEW AVE 33 32,868 84 02-16-22 MARIPOSA AVE END CDS HIGHLAND AVE 33 53,801 84 02-16-22 MARK LN EUREKA AVE SUNNY LN 33 14,855 80 02-07-22
MACKENZIE AVE ROANOKE AVE GRANDBY DR 27 35,667 73 02-22-22 MAIDEN MOOR LN CAMINO DE BRYANT END CDS 28 9,173 79 09-17-15 MEADOW LAKE LANE BRUSH CANYON DR END OF CDS 33 18,128 68 09-17-15 MEADOW LAND DR BRUSH CANYON DR CAMINO DE BRYANT 33 74,514 77 09-17-15 MEADOWVIEW DR CASA ORO DR END CDS 37 23,393 52 02-10-22 MEADOWVIEW DR JEANEAN LN END CDS 33 18,788 81 02-15-22
MEADOWVIEW DR PROSPECT AVE END CDS 33 16,643 70 02-10-22 MEADOWVIEW DR CASA LOMA AVE END CDS 33 23,243 80 02-07-22 MELBOURNE LN END CDS RAINTREE ST 33 25,525 95 02-24-22
MAGNOLIA WAY LAKEVIEW AVE MAGNOLIA AVE 33 11,060 86 02-18-22 MAGNOLIA AVE MAGNOLIA WAY PEPPER GROVE ST 33 14,025 89 02-18-22 MAHOGANY CIR MANZANITA AVE END CDS 33 28,391 53 02-25-22 MILANO CT TRENTINO LN GENOA WY 33 64,020 91 02-04-22
MIMOSA DR EL CAJON AVE N END CDS 33 9,482 86 02-10-22
MIMOSA DR EL CAJON AVE S END CDS 33 17,996 86 02-10-22
MINDEN DR BRIARHILL DR CASA ORO DR 37 8,473 79 02-10-22 MINDEN DR CASA ORO DR END CDS 37 17,066 74 02-10-22
MIRAGE ST SAVI RANCH PKWY OLD CANAL RD. 61 28,596 69 02-17-22 MIRAGE ST SAVI RANCH PKWY CRYSTAL 61 30,450 67 02-17-22 MAJORCA LN ORLANDO DR END CDS 33 16,841 69 02-02-22
MULBERRY WAY BRUSH CANYON DR END OF CDS 33 15,191 74 09-17-15 MANOR VIEW DR FUTURA DR CAPRICE DR 33 39,072 95 02-09-22 MAIN ST IMPERIAL HWY LEMON DR 24 23,220 95 02-08-22
MAIN ST LEMON DR END CDS 33 19,481 81 02-08-22
MONTECITO DR GRANDVIEW AVE EUCALYPTUS HILL 33 22,308 95 02-18-22 MOUNT HOOD WAY SMOKEY MTN WAY END CDS 28 36,977 83 09-17-15 MOUNT RAINER WAY SMOKEY MTN WAY END OF CDS 28 29,529 83 09-17-15 MOUNT SHASTA WAY SMOKEY MTN WAY END OF CDS 28 41,009 83 09-17-15 MOUNT WHITNEY WAY ELK MTN WAY END CDS 28 24,573 83 09-17-15 MANZANITA AVE PEPPER AVE VILLAGE CENTER DR 33 13,733 66 02-25-22 MANZANITA AVE VILLAGE CENTER DR SMOKETREE W/S 31 23,250 52 02-25-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
MANZANITA AVE SMOKETREE E/S END CDS 27 42,722 68 02-25-22 MOLLIE LN KAYE LN END CDS 33 9,185 70 02-09-22
MONETTE CIRCLE RICHFIELD RD END CDS 33 20,273 81 02-25-22 MONTEREY CIRCLE WISTERIA DR END CDS 33 6,479 80 02-08-22 MORGAN CT JUTLAND LN CDS 32 15,365 93 02-04-22
MOUNTAIN VIEW AVE LYNNBROOK PZ COUNTRY VIEW DR 33 11,286 95 02-09-22 MOUNTAIN VIEW AVE KELLOGG DR OHIO ST S/S 33 61,239 78 02-18-22 MOUNTAIN VIEW AVE OHIO ST S/S END OF ROAD 24 41,208 73 02-18-22 MOUNTAIN VIEW AVE YORBA LINDA BLVD END CDS 37 28,018 95 02-16-22 MAPLE CIRCLE GLOXINIA DR END CDS 33 7,007 48 03-05-20
MARIAH CT PROSPECT DR END CDS 33 24,101 73 02-12-22
MIRKWOOD RUN LIVE OAK LN END CDS 27 27,143 72 02-11-22
MORNING DEW WAY EVENING BREEZE END OF CDS 33 17,600 68 09-17-15 MARQUET COURT PICASSO DR END OF CDS 33 12,914 83 09-17-15 MERRY WEATHER CIR BLUE RIDGE DR END OF CDS 28 6,009 83 09-17-15 MARSALA DR CORDOVA PALOMA LN 36 27,032 69 02-02-22
MARSHBURN CIRCLE YORBNA LINDA BLVD END CDS 33 17,864 95 02-23-22 MISSION HILLS LANE HIDDEN HILLS RD STARWOOD S/S 33 60,291 64 02-23-22 MISSION HILLS LANE STARWOOD S/S HIDDEN HILLS RD 33 22,077 59 02-23-22 MISTY WAY WEATHERLY DR END CDS 33 14,630 89 02-08-22
MT TRUMPH WAY KODIAK MTN DR END OF CDS 33 37,961 83 09-17-15 NAPLES CT UMBRIA WY CDS 33 31,790 94 02-04-22
NEFF RANCH RD RICHFIELD RD END CDS 33 29,447 94 02-22-22 NIANTIC PL LA CASITAS AVE END CDS 33 10,076 79 02-08-22 NICKLAUS RD SHEEHAN ST CDS 33 30,569 80 02-05-22
NOGAL AVE LA CASITAS AVE END 33 16,302 70 02-08-22
NORFOLK CIRCLE RUTLAND DR END CDS 33 7,304 80 02-16-22
NOVA DR MANOR VIEW DR FAIRMONT BLVD 37 5,180 95 02-09-22 NEW RIVER RD E/B YORBA LINDA BLVD ESPERANZA RD 22 32,670 75 03-01-22 NEW RIVER RD W/B ESPERANZA RD YORBA LINDA BLVD 22 33,380 78 03-01-22 OAK BURL DR GREY STONE DR SAND ROCK CIRCLE 33 8,453 77 02-10-22 OAKHILL DR CLOVERDALE WY END CDS 27 22,796 92 02-09-22
OAKHURST CIRCLE ROSE DR END CDS 33 24,596 75 02-15-22
OAKLAWN LN HOOSTER LAWN WY CDS 37 43,955 85 03-05-20
OAK TREE CT AVOCADO AVE OAK TREE CT 33 4,752 84 02-09-22 OAK TREE CT S END CDS N END CDS 37 22,477 70 02-09-22
OLD CANAL ROAD BRIDGE @ WEIR CANYON SAVI RANCH PKWY 50 146,100 70 02-17-22 ODESSA DR END CDS ROXDALE DR 33 24,700 82 02-10-22
OHIO ST END OF CDS SHORT ST 33 40,436 95 02-18-22
OHIO ST SHORT ST SCENIC VIEW 33 25,971 85 02-18-22
OHIO ST END CDS LINDA VERDE 37 18,435 69 02-18-22
OHIO ST LINDA VERDE BUENA VISTA AVE 37 17,279 80 02-18-22 OHIO ST MOUNTAIN VIEW AVE YORBA LINDA BLVD 33 78,870 81 02-18-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
OHIO ST YORBA LINDA BLVD ORIENTE S/S 27 52,540 80 02-05-22 OHIO ST ORIENTE S/S END 24 33,480 69 02-05-22
OAK LEAF LN EUREKA LN ACORN CT 33 15,213 95 02-08-22
OAK MEADOW DR FAIRMONT BLVD BROOKMOUNT DR 33 96,393 95 02-09-22 OLDENBURG LN LIPIZZAN LN FALABELLA LN 32 16,576 94 02-05-22 OLD VILLAGE RD LA PALMA LA PALMA 33 51,546 76 09-17-15
OLINDA ST IMPERIAL HWY LEMON DR 40 17,440 95 02-08-22
OLIVE TREE CIRCLE RICHFIELD RD W END CDS 33 18,480 95 02-23-22 ORANGE GATE DR ORCHARD DR END CDS 34 30,675 95 02-22-22 ORANGEBLOSSOM LN HARVEST WAY END CDS 33 22,616 80 02-24-22 ORANGE DR LIBRA PL SANTA FE 33 17,259 71 02-12-22
ORANGE DR SANTA FE 100'' W/O BRIARHILL 37 23,014 71 02-12-22 ORANGE DR 100'' W/O BRIARHILL VALLEY VIEW AVE 33 42,042 75 02-12-22 ORANGE DR JEANEAN LN ROSE DR 33 19,503 79 02-12-22
ORANGE DR BROOKWAY AVE PROSPECT AVE 33 12,870 79 02-10-22 ORANGEWOOD LN HARVEST WAY END CDS 33 21,956 81 02-24-22 ORIENTE DR LAKEVIEW AVE OHIO ST 33 86,955 86 02-05-22
ORIENTE DR OHIO ST PALM AVE 33 43,230 73 02-05-22
ORLANDO DR LOMBARDY LN LA TIERRA LN 36 42,120 95 02-02-22 ORANGE TERRACE VALLEY VIEW END CDS 37 20,470 88 02-10-22 OSMOND ST BASTANCHURY RD END 33 28,710 71 02-14-22
OYSTER BAY DIAMOND HILL SOMERSET RD 33 11,319 79 02-05-22 PABLO ROAD DOMINGUEZ RANCH RD N END CDS 33 18,975 42 03-05-20 PACIFIC AVE END CASA LOMA AVE 33 5,280 82 02-12-22
PACIFIC AVE CASA LOMA AVE DENVER AVE 33 8,877 82 02-12-22 PACIFIC AVE LA CONCETTA DR RICARDO DR 33 8,019 82 02-14-22 PAGE CT RICHFIELD RD END CDS 38 25,846 87 02-23-22
PARK AVE YORBA LINDA BLVD LEMON DR 29 38,106 68 02-08-22 PARK PL PARK AVE YORBA LINDA BLVD 36 17,568 73 02-08-22 PASEO DE LA RAMBLA PASEO DE LA CUMBRE PASEO DEL PRADO 34 68,510 46 03-05-20 PASEO DE LA RAMBLA PASEO DEL PRADO CALLE VISTA LINDA 34 6,290 70 03-05-20 PASEO ALTO PASEO DE LAS PALOMAS E END CDS 33 7,920 71 03-05-20 PASEO ARNALDO PASEO LORENZO N END CDS 33 8,921 95 02-24-22 PASEO CALIENTE PASEO SERRA PASEO TORTUGA 33 12,540 52 03-05-20 PASEO DEL RETIRO PASEO DE LA CUMBRE S END CDS 30 37,500 69 03-05-20 PASEO PANORAMA PASEO DEL PRADO PASEO ALTO 33 63,030 63 03-05-20 PASEO RICO CARLOS ROAD VIA CORONADO 33 21,285 41 03-05-20 PASEO SERRA CARLOS ROAD PASEO CALIENTE 33 13,200 52 03-05-20 PASEO TORTUGA PASEO CALIENTE TRAIL SIDE DRIVE 33 29,711 59 03-05-20 PASO FINO WY CLYDESDALE DR CDS 32 25,733 86 02-04-22
PASO FINO WY CLYDESDALE DR BELGIAN LN 32 12,000 90 02-04-22 PASEO GILBERTO VISTA MONTANA PASEO LORENZO 33 52,800 95 02-24-22 PASEO JOAQUIN PASEO LORENZO END CDS 33 20,867 95 02-24-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
PASEO LORENZO PASEO GILBERTO VISTA LAGUNA 33 42,113 95 02-24-22 PASEO LUIS PASEO GILBERTO END CDS 33 29,513 95 02-24-22 PEBBLE BEACH LN FIRCREST DR MOUNTIAN VIEW AVE 33 15,642 95 02-18-22 PICASSO DR CAMINO DE BRYANT END OF CDS 33 55,220 83 09-17-15 PEACH TREE LN APPLE ORCHARD DR END CDS 33 13,027 87 02-10-22 PEPPER AVE. E/S LIVE OAK LN VILLAGE CENTER DR 27 6,750 66 02-11-22 PEPPERGROVE ST END OF CDS LAKEVIEW AVE 33 31,229 83 02-18-22 PEPPERTREE LANE SADDLETREE LN END CDS 33 18,991 95 02-11-22 PEPPER AVE. W/S VILLAGE CENTER DR END CDS 33 88,253 70 03-01-22 PIMLICO TER SANTA ANITA WAY CDS 34 20,117 89 03-05-20
PINE CIRCLE RICH HILL WAY END CDS 37 17,085 95 02-25-22 PINERIDGE DR HIGHLAND AVE END CDS 33 20,834 95 02-16-22 PIPER PL BOEING AVE END CDS 33 8,921 70 02-08-22
PIPER PL LAKEVIEW AVE PLUMOSA DR 37 45,288 79 02-07-22
PLACERVILLE PL FURNACE CREEK RD END CDS 33 8,987 95 02-09-22 PALOMA LN END CDS END CDS 36 24,550 89 02-02-22
PALM AVE ORIENTE N/S END 24 24,072 68 02-05-22
PALM AVE YORBA LINDA N/S ORIENTE S/S 30 60,296 69 02-05-22 PLUMOSA DR CARI LN LEMON DR 37 63,529 77 02-07-22
PLUMOSA DR CARI LN BASTANCHURY RD 33 38,544 77 02-07-22 PLUM TREE LN RICHFIELD RD END CDS 33 25,388 89 02-22-22 POMEGRANATE CAMINO DE BRYANT RANCHO SANTA ANA 33 28,050 83 09-17-15 PINE CREST CIR FAIRMONT BLVD END CDS 33 20,999 64 02-14-22 PINE MEADOW WAY MEADOWLAND LANE END OF CDS 33 44,528 60 09-17-15 PINGREE WAY CHANNING LANE END CDS 33 31,894 88 03-05-20 PONDEROSA WY NORTH END CDS SOUTH END CDS 33 35,987 83 02-10-22 PRENTISS DR LOIE ST END CDS 33 25,289 86 02-10-22
PRENTISS PL PRENTISS DR END CDS 33 3,564 86 02-10-22
PRIMROSE LN JASMINE WY CDS 33 18,457 94 02-09-22
PARKHURST PL COUNTRY VIEW DR END CDS 33 27,896 95 02-09-22 PARK RIDGE KELLOG WAGON WHEEL 30 3,660 95 02-28-22
PARKSIDE DR SADDLETREE LANE COUNTRY VIEW DR 33 34,716 95 02-09-22 PARKVIEW TER OAK MEADOW DR LYNNBROOK PZ 34 17,150 95 02-09-22 PARKVIEW TER OAK MEADOW DR KINGSBRIAR DR 33 8,052 95 02-09-22 PROSPECT AVE IMPERIAL HWY WABASH AVE 37 57,461 82 02-12-22 PROSPECT AVE IMPERIAL HWY BASTANCHURY RD 33 32,142 83 02-12-22 PROSPECT AVE BASTANCHURY RD HILLCREST CIRCLE 33 67,650 74 02-12-22 PROSPECT AVE HILLCREST CIRCLE YORBA LINDA BLVD 33 60,126 63 02-12-22 PASEO DE LA CUMBRE YORBA RANCH RD PASEO DEL PRADO 37 87,727 62 03-24-20 PASEO DE LAS PALOMAS E/B FAIRMONT BLVD N/S VIA DEL MAR N/S 29 45,056 95 02-07-22 PASEO DE LAS PALOMAS E/B VIA DEL MAR N/S VILLAGE CENTER W/S 29 43,945 95 02-07-22 PASEO DE LAS PALOMAS E/B VILLAGE CENTER W/S PASEO DEL PARDO E/S 29 61,424 84 03-01-22 PASEO DE LAS PALOMAS E/B PASEO DEL PARDO E/S YORBA LINDA BLVD W/S 25 83,575 82 03-01-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
PASEO DE LAS PALOMAS W/B YORBA LINDA BLVD S/S INGRESO S/S 25 54,025 77 03-01-22 PASEO DE LAS PALOMAS W/B INGRESO S/S VIA AZAFRAN S/S 29 61,961 76 03-01-22 PASEO DE LAS PALOMAS W/B VIA AZAFRAN S/S VILLAGE CENTER N/S 29 29,309 76 03-01-22 PASEO DE LAS PALOMAS W/B VILLAGE CENTER S/S VISTA LAGUNA S/S 29 39,575 95 02-07-22 PASEO DE LAS PALOMAS W/B VISTA LAGUNA S/S FAIRMONT BLVD S/S 29 45,756 95 02-07-22 PASEO DE TORONTO CAMINO DE BRYANT W/S CANTADA E/S 33 72,600 79 09-16-15 PASEO DE TORONTO CANTADA E/S VIA LOMAS DE YORBA 33 40,623 76 09-16-15 PASEO DE TORONTO VIA LOMAS DE YORBA AVENIDA DEL TREN 33 66,047 68 09-16-15 PASEO DEL PRADO PASEO DE LAS PALOMAS CIRCULO VISTA N/S 52 111,072 52 02-07-22 PASEO DEL PRADO CIRCULO VISTA N/S ESPERANZA RD 52 120,120 49 02-07-22 PUESTA DEL SOL W/S AVENIDA RIO DEL ORO AVENIDA DE LAS FLORES 36 37,080 81 02-03-22 POTOMAC AVE ROANOKE AVE GRANBY DR 27 21,951 54 02-22-22 PUNTO DE VISTA VIA INGRESO VISTA DEL AMIGO 33 13,860 71 03-05-20 PUESTA DEL SOL E/S VIA DE LA LUNA AVENIDA DEL ESTE 33 27,560 70 02-03-22 PUESTA DEL SOL E/S VIA DE LA LUNA AVENIDA RIO DEL ORO 36 8,568 85 02-03-22 QUAIL CIR FAIRMONT BLVD END CDS 33 12,683 64 02-28-22
QUARTER HORSE DR FAIRMONT BLVD CDS 37 50,578 93 02-04-22 QUIET MEADOW LN ARBOR GATE LN COBBLESTONE CT 33 9,405 87 02-08-22 RAINBOW LN WEATHERLY DR END CDS 33 18,293 92 02-08-22
RAINTREE ST MELBOURNE LN CALGARY AVE 33 57,788 89 02-24-22 RAMONA ROAD DOMINGUEZ RANCH RD N DOMINGUEZ RANCH RD S 33 66,000 58 03-05-20 RANCHO LN PROSPECT AVE W END CDS 33 23,342 87 02-10-22
RANCHO LN PROSPECT AVE E END CDS 33 28,292 82 02-10-22
RICHFIELD WAY YORBA LINDA BLVD END CDS 37 12,626 95 02-10-22 ROCKHAMPTON CT STONEHAVEN DR END OF CDS 33 50,181 65 02-18-22 RIDGE PARK DR SAN ANTONIO RD END CDS 37 65,388 66 02-14-22 RIDGEWOOD PL KINGSBRAIR DR OAK MEADOW DR 33 7,161 95 02-09-22 RIDGEWOOD PL OAK MEADOW DR BROOKHILL DR 33 35,975 95 02-09-22 RIDGE WAY SHORT ST END OF CDS 33 33,638 90 02-18-22
REBECCA LN RICHFIELD RD END CDS 33 20,608 95 02-22-22
REDCASTLE ST TIPPERARY CT GALWAY BAY RD 33 8,646 78 02-07-22 RED ROAN LN JUTLAND LN CDS 33 49,906 77 02-04-22
REDWOOD ST CASCADES AVE CUMBERLAND CIR 33 22,407 79 02-16-22 REGULUS DR VAN BUREN ST BRIARHILL DR 37 20,609 86 02-12-22 REGULUS DR SANTA FE ST END 33 15,345 79 02-12-22
RED PINE RD VALLEY VIEW CIR CDS 33 25,552 86 02-09-22
REGAL OAKS DR CASSIA LN END CDS 27 11,402 72 02-25-22
RICARDO DR PACIFIC AVE END CDS 33 11,396 84 02-14-22
RICH HILL WAY 120'' S/O MONETTE CIR END CDS 33 10,241 81 02-25-22 RICH HILL WAY 120'' S/O MONETTE CIR PINE CIR 37 62,530 83 02-25-22 RICH HILL WAY PINE CIR WILLOW CIR 37 9,065 95 02-25-22
RICHFIELD PL END CDS END CDS 33 17,187 76 02-22-22
RIO DE PLATA DR LAKEVIEW AVE SCHOOL ST 33 15,312 54 02-08-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
RIO DE ORO DR SCHOOL ST VALENCIA AVE 33 10,565 54 02-08-22 RIDGECREST DR RICHFIELD RD CASA LOMA AVE 37 29,452 95 02-22-22 RIDGEDALE LN CARLTON PL VALLEY VIEW AVE 33 15,180 95 02-14-22 AVENIDA RIO DEL ORO YORBA LINDA BLVD PUESTA DEL SOL N/S 50 33,350 39 02-02-22 AVENIDA RIO DEL ORO AVENIDA DEL NORTE PUESTA DEL SOL N/S 36 85,460 83 02-02-22 AVENIDA RIO DEL ORO YORBA LINDA BLVD FELICIA DR 40 18,200 95 02-09-22 RIVERVIEW DR END CDS GLENDALE DR 33 23,177 95 02-28-22
ROLLING HILLS LN END OF CDS END OF CDS 33 55,792 77 02-23-22 RIM CREST DR FAIRMONT BLVD BLUE GUM 37 83,918 65 02-24-22 RANCHO SANTA ANA POMEGRATE RD SUSANNA BRYANT 33 23,760 83 09-17-15 RUNNING SPRING WAY EVENING BREEZE N/S BRUSH CANYON N/S 30 27,600 66 09-17-15 ROANOKE AVE AVENIDA ADOBE TODD AVE 35 29,400 72 02-22-22 RAINWOOD AVE PEPPER AVE PEPPER AVE 27 43,605 69 02-25-22 ROBIN CIRCLE WALNUT LANE END OF CDS 37 9,851 67 02-18-22 ROCKROSE CIR RICHFIELD RD END CDS 33 18,854 95 02-23-22 ROSEBUD DR PROSPECT AVE END CDS 33 23,573 79 02-10-22
ROXDALE DR END CDS END 33 17,501 85 02-10-22
ROSEWOOD DR BOX CANYON DR SLEEPING OAK DR 33 5,115 83 09-16-15 RUMSON ST GREENWICH CIR WINDEMERE DR 33 3,597 59 02-16-22 RUSTIC RD EL CAJON AVE END CDS 33 10,109 63 02-10-22
RUTLAND DR CUMBERLAND CIR DURHAM DR 33 22,379 70 02-16-22 RAVENNA DR MALAGA LN CORDOVA DR 36 27,968 69 02-02-22
RAVENSWOOD DR FAIRMONT BLVD END CDS 33 28,556 63 02-24-22 SAGA DR PROSPECT AVE SANTA FE ST 33 26,070 80 02-12-22
SAGA DR ROSE DR PROSPECT AVE 33 36,597 81 02-12-22
SANDOLO RD ZAHARIAS RIDGE CDS 33 15,224 68 02-05-22
SANTA FE ST END ORANGE DR 37 32,560 56 02-12-22
SANTA FE ST ORANGE DR YORBA LINDA BLVD 37 45,029 75 02-12-22 SANTA FE ST YORBA LINDA BLVD CITY LIMIT 33 32,835 95 02-24-22 SAN PABLO CIRCLE LA ENTRADA DR END CDS 33 13,442 81 02-07-22 SAND ROCK CIRCLE OAK BURL DR END CDS 33 13,442 76 02-10-22 SAN RUFINO CIRCLE LA ENTRADA DR END CDS 31 13,229 81 02-07-22 SAN SIMEON CIRCLE LA ENTRADA DR END CDS 31 14,159 82 02-07-22 SAN RAFAEL LN VALLEY VIEW CIR SANTA CLARA CT 36 11,304 76 02-11-22 SARATOGA ST CUMBERLAND CIR CASCADES AVE 33 22,077 79 02-16-22 SARAZEN CT ZAHARIAS RIDGE CDS 33 24,959 84 02-05-22
SCHOOL ST LEMON DR ARROYO ST 27 15,492 95 02-08-22
SCHOOL ST RIO DE PLATA DR RIO DE ORO DR 33 12,446 61 02-08-22 SCHOOL ST AVOLINDA DR PIPER PL 33 11,748 79 02-07-22
SCENIC VIEW DR OHIO ST BUENA VISTA AVE 33 36,894 79 02-18-22 SECOND ST CHESTNUT ST MARDA AVE 37 47,545 71 02-11-22
SECOND ST MARDA AVE LOS ANGELES ST 37 23,310 85 02-11-22 SCOTCH PINE RIDGE SUMMER OAK PL MAJESTIC CYPRESS WAY 33 17,363 69 02-25-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
SADDLETREE LANE PEPPERTREE LANE END CDS 33 61,061 95 02-11-22 SEABISCUIT RUN WEST CDS EAST CDS 38 73,956 75 02-09-22
SECRETARIAT WY BASTANCHURY RD CDS 38 46,857 70 02-09-22 SEMINOLE WAY RICHFIELD RD END CDS 33 23,496 77 02-22-22 SEQUOIA CIRCLE JOSHUA DR END CDS 33 9,185 80 02-08-22
SEGOVIA LN CASIANO DR END OF CDS 33 12,094 90 02-02-22
SHAY DEL PL TRAIL VIEW PL END CDS 33 13,772 95 02-22-22 SHARON CIRCLE KAYE LN END CDS 33 9,548 80 02-09-22
SHANE WAY RICH HILL WAY CASSON DR 33 14,498 69 02-22-22 SHADOW OAK DR FAIRMONT BLVD FOXHOLLOW DR 27 27,433 63 02-25-22 SHADY CREEK LANE BRUSH CANYON DR END OF CDS 33 16,412 72 09-17-15 SHADY GLEN PL FAIRMONT BLVD END OF CDS 33 10,756 95 02-28-22 SHADY MEADOW LN GREEN MEADOW WAY END OF CDS 33 12,518 68 09-17-15 SHEEHAN ST WATSON WY NICKLAUS RD 33 12,804 79 02-05-22
SHAKARI DR LONG BAY END CDS 27 22,275 89 03-05-20
SHAW LN PARK AVE END 14 5,768 72 02-08-22
SHORT ST CITY LIMITS RIDGE WAY 27 37,801 83 02-17-22
SHORT ST RIDGE WAY OHIO 33 25,410 89 02-17-22
SHORT ST OHIO END OF CDS 33 10,890 91 02-17-22
SHERWOOD DR RIM CREST END CDS 29 19,845 68 02-24-22
SHETLAND LN DAPPLE GRAY LN CDS 33 23,572 94 02-05-22
SIENNA LN ORLANDO DR GRANADA DR 36 24,548 68 02-02-22
SILVER MAPLE DR NORTH CDS SOUTH CDS 34 26,226 87 02-09-22 SILVER DOLLAR WY BLACK WALNUT CT BIG OAK LN 33 6,336 83 02-11-22 SILVER SPURS LN LOS PALOMINOS DR BUCKSKIN CIRCLE 33 9,580 80 02-10-22 SILVERTIP CIRCLE VAN BUREN ST END CDS 33 18,722 95 02-24-22 SKYLINE DRIVE E/S MISSION HILLS LN END OF CDS 33 21,890 77 02-23-22 SKYLINE DRIVE W/S MISSION HILLS END OF CDS 33 12,320 74 02-23-22 SKYRIDGE DR HIDDEN HILLS DR GREEN CREST 26 45,864 72 02-22-22 SLEEPING OAK DR WOODLAND AVE LOTUS AVE 33 13,535 81 09-16-15 SUMAC RIDGE STONE CANYON END CDS 33 22,121 95 02-28-22
SMOKETREE AVE END CDS MANZANITA AVE 27 28,926 62 02-11-22 SMOKETREE AVE MANZANITA AVE JUNIPER AVE 33 32,076 61 02-11-22 SMOKEY MTN WAY MT TRUMPH WAY ELK MTN WAY 33 96,855 83 09-17-15 SOMERVILLE CIR WALNUT CREEK RD END CDS 33 9,713 95 02-28-22 SAN ANTONIO RD YORBA LINDA BLVD VIA CORZO 50 19,850 58 02-03-22 SAN ANTONIO RD VIA CORZO ALDER AVE 37 55,574 67 02-03-22 SAN ANTONIO RD ALDER AVE VIEW PARK DR 37 79,217 64 02-03-22 SAN ANTONIO RD VIEW PARK DR FAIRMONT BLVD 37 120,250 76 02-03-22 SAN ANTONIO RD FAIRMONT BLVD END CDS 33 33,143 82 02-03-22 SUN BEAM RD HIDDEN HILLS RD END OF CDS 24 15,197 71 02-22-22 SUNBURY CIRCLE SOUTHVIEW END CDS 27 8,405 71 03-05-20
SANDS POINT STONE CANYON END CDS 32 8,013 95 02-28-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
SANDY HILL LANE ARROYO CAJON DR PARK SIDE DR 33 40,491 95 02-28-22 SINGINGWOOD DR FAIRMONT BLVD END CDS 33 24,849 49 02-25-22 SUNNY SIDE DR RIM CREST DR END CDS 29 19,874 69 02-24-22 SUNNY VIEW CIR GRAND VIEW AVE END OF CDS 37 20,803 80 02-18-22 VIA SANTA MARIA VILLAGE CTR LONGBAY 33 4,950 62 03-05-20 VIA SANTANDER VIA SONADOR PASEO DE LAS PALOMAS 40 35,520 66 03-05-20 SOUTHERN HILLS WY LAKEVIEW AVE W HILLS WY 33 12,804 88 02-08-22 SOUTHERN HILLS WY LAKEVIEW AVE END CDS 33 14,875 91 02-08-22 SOMERSET RD LAKEVIEW AVE SPYGLASS HILL 37 11,285 79 02-05-22 SONOMA WAY TRAIL VIEW PL JAY ST 33 12,941 95 02-22-22
SOUTHERN POINTE LN SOUTHERN HILLS WY END CDS 33 11,806 93 02-08-22 SPRING OAK VIEW PARK DR END CDS 33 11,330 91 02-14-22
SPYGLASS HILL HOMESTEAD AVE DIAMOND HILL 33 32,934 81 02-05-22 SANTA CLARA CT WEST CDS EAST CDS 28 11,909 80 02-11-22
SANTA CRUZ CT SANTA RAFAEL LN END 34 34,000 82 02-11-22 STAFFORD CIRCLE VAN BUREN ST END CDS 33 12,749 70 02-24-22 STEEPLECHASE WY FABELLA LN CLYDESDALE DR 33 14,619 93 02-05-22 STEEPLECHASE WY CLYDESDALE DR CDS 33 16,741 92 02-05-22 SUTHERLAND DR ROCKHAMPTON CT END OF CDS 33 14,861 73 02-18-22 SOUTHVIEW DR EASTHILL DR END CDS 33 36,575 78 03-05-20
SOUTHWIND LANE BRUSH CANYON DR END OF CDS 33 13,046 71 09-17-15 STONE CANYON AVE WAGON WHEEL DR WAGON WHEEL DR 33 44,560 95 02-28-22 STONECREST LANE ARROYO CAJON DR END CDS 33 24,464 95 02-11-22 STONEHURST PZ CANYON DR END CDS 33 18,381 95 02-09-22
STONEWOOD DR HIDDEN HILLS RD ROLLING HILLS LN 33 6,105 72 02-23-22 STONEHAVEN YORBA LINDA BLVD AVIEMORE DR E/S 46 109,798 64 02-18-22 STONEHAVEN AVIEMORE DR E/S HEATHERIDGE W/S 46 36,478 67 02-18-22 STONEHAVEN HEARHERIDGE W/S BLUE MOUNTIAN E/S 37 52,614 75 02-18-22 STONEHAVEN BLUE MOUNTIAN E/S VIA DE LA ROCA 46 27,600 77 02-15-22 STARLIGHT DR HIDDEN HILLS RD END OF CDS 33 10,901 63 02-23-22 STIRLINGBRIDGE CIR STONEHAVEN DR END CDS 33 14,795 61 02-18-22 STARWOOD DR MISSION HILLS LN END OF CDS 33 18,227 67 02-23-22 SUFFOLK CIRCLE RUTLAND DR END CDS 33 7,271 79 02-16-22
SUGAR PINE DR SUMMER OAK PL GREEN PINE WAY 33 58,679 93 02-25-22 SUMMER OAK PL SCOTCH PINE DR SCOTCH PINE RIDGE 33 19,668 83 02-25-22 SUN HILL DRIVE HIGHLAND AVE SUN VIEW RD 33 26,075 90 02-22-22 SUN KNOLL CIRCLE END CDS SUN KNOLL DRIVE 33 7,601 90 02-22-22 SUN KNOLL DR SUN VIEW RD HIGHLAND AVE 33 32,312 91 02-22-22 SUNNY LN MARK LN END CDS 33 26,345 80 02-09-22
SUNMIST DR ARROYO CAJON DR MOUNTAIN VIEW AVE 33 51,810 95 02-11-22 SUNVIEW ROAD SUN HILL ROAD SUN KNOLL DR 33 23,600 90 02-22-22 SUNWEST CIRCLE VALLEY VIEW AVE END CDS 37 21,580 69 02-10-22 SUSANNA BRYANT RANCHO SANTA ANA POMEGRANATE 33 7,260 83 09-17-15
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VIA SEVILLA VIA BELARMINO END CDS 33 11,264 68 03-05-20 SAVI RANCH PKWY CITY BOUNDARY OLD CANAL RD 50 61,500 66 02-09-22 SAVI RANCH PKWY OLD CANAL RD MIRAGE ST 44 74,838 52 01-27-22 SAVI RANCH PKWY MIRAGE ST WEIR CANYON 44 46,070 47 01-27-22 SWEET BAY CT IRON BARK WY CDS 33 10,768 85 02-11-22
SWEETWATER PL FURANCE CREEK RD END CDS 33 7,337 95 02-09-22 SYCAMORE CIRCLE AVOCADO AVE END CDS 34 20,757 85 02-05-22 TEMHURST CT OAKLAWN LN CDS 32 13,989 89 03-05-20
TERRA LINDA LN VAN BUREN ST HARVEST WAY 33 3,960 81 02-24-22 TERRACE LN W HILLS WY END CDS 33 11,344 91 02-08-22
THAGARD WAY GALLAL WAY E END CDS 26 28,600 81 03-05-20
THICKET LN HARVEST WAY GROWERS CIRCLE 33 9,504 51 02-24-22 THIRD ST WABASH AVE MARDA AVE 42 66,906 78 02-11-22
THISTLEDOWN CIR ROCKHAMPTON CT END OF CDS 37 22,413 85 02-18-22 TIPPERARY CT JOEL BRATTAIN DR REDCASTLE ST 33 10,263 78 02-07-22 TIMBER RIDGE RD FAIRMONT BLVD END CDS 33 37,136 65 02-14-22 TAMARISK DR MOUNTIAN VIEW AVE FIRCREST DR 33 17,764 95 02-18-22 TODD AVE ROANOKE AVE GRANBY DR 35 52,850 73 02-22-22
TORREY PINE PL GREEN PINE WAY BRISTLE CONE LN 33 25,514 95 02-24-22 TORIDA WAY ORANGE DR END CDS 37 22,209 69 02-15-22
TORIDA WAY ORANGE DR FOLEY DR 33 35,838 61 02-15-22
TORIDA WAY LA KENICE WAY YORBA LINDA BLVD 33 18,447 95 02-24-22 TRAIL VIEW PL SONOMA WAY RIDGECREST DR 33 10,928 95 02-22-22 TRAIL VIEW PL RICHFIELD RD SEMINOLE WY 33 30,789 95 02-22-22 TRAVIS ROAD PASEO DEO PRADO END 33 6,600 52 03-05-20
TRENTINO LN FAIRMONT BLVD CORTONA CT 37 52,688 94 02-04-22 TRAIL CREST LN SADDLETREE LN END CDS 27 21,284 95 02-28-22 TRAIL RIDGE SAN ANTONIO RD END CDS 27 9,917 67 03-01-22 TRAILSIDE DRIVE DOMINGUEZ RANCH ROAD YORBA RANCH ROAD 33 25,410 74 03-05-20 TRAILSIDE DRIVE YORBA RANCH ROAD VIA PERLA 33 18,150 38 03-05-20 TROTTER LN WELSH PONY LN QUARTER HORSE DR 32 40,672 95 02-04-22 TRIX CIR BASTANCHURY RD END CDS 33 8,459 90 02-12-22
TUCANA ST ORANGE DR END CDS 33 16,181 79 02-12-22
TULIP CIR GLOXINIA DR END CDS 33 3,333 38 03-05-20
TURFWAY PK FAIRPLEX DR CDS 32 27,557 82 03-05-20
TUSCANY WY TRENTINO LN VOLTERRA LN 33 11,616 92 02-04-22 TWIN OAK SAN ANTONIO RD END CDS 33 34,166 65 02-14-22
TOYON TERRACE COUNTRY VIEW DR END CDS 33 6,809 95 02-09-22 UMBRIA WY TRENTINO LN CDS 37 101,241 93 02-04-22
VALENCIA AVE LEMON DR END 24 17,080 95 02-08-22
VALENCIA AVE RIO DE ORO RIO DE PLATA DR 33 12,177 55 02-08-22 VALENCIA AVE PIPER PL END CDS 33 7,403 79 02-07-22
VAN BUREN ST REGULUS DR YORBA LINDA BLVD 33 16,345 86 02-12-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VAN BUREN ST BUENA VISTA AVE YORBA LINDA BLVD 40 121,240 86 02-24-22 VAN BUREN ST BUENA VISTA AVE CITY LIMIT 40 69,600 84 02-24-22 VAN BUREN CIRCLE VAN BUREN ST END CDS 37 6,225 93 02-12-22 VIA PEPITA VILLAGE CENTER DR END CDS 33 49,676 61 02-24-22 VIA RIVERA VIA DEL BUEY END OF CDS 36 8,837 73 02-24-22 VERNA LN ROSE DR END CDS 33 12,089 63 02-10-22
VIA ALVARADO DOMINGUEZ RANCH ROAD N N END CDS 33 2,310 66 03-05-20 VIA CORONADO PASEO RICO END CDS 33 10,560 53 03-05-20
VIA ADELA VISTA LAGUNA END CDS 33 14,300 95 02-10-22
VIA AUGUSTO END CDS VIA CERVANTES 33 17,501 85 03-05-20 VIA ALEGRE AVENIDA DEL NORTE END CDS 33 17,369 91 02-02-22 VIA ALISA DOMINGUEZ RANCH ROAD W END CDS 33 10,725 46 03-05-20 VIA ALMERIA VISTA DEL MAR END CDS 34 25,823 95 02-08-22 VIA ALVARADO DOMINGUEZ RANCH ROAD S END CDS 33 10,065 68 03-05-20 VIA AMANTE VIA CONTENTO END CDS 33 19,547 68 02-14-22
VIA AMARILLA AVENIDA DE LOS ARBOLES END CDS 33 21,296 75 02-25-22 VIA ARBOLEDA LAKEVIEW AVE END OF CDS 33 24,040 82 02-18-22 VIA ARRIBA LINDA VIA LOMAS DE YORBA W/S VIA BRAVO 33 39,930 68 09-16-15 VIA ASTURIAS VIA CERVANTES VIA BELARMINO 33 12,611 63 03-05-20 VIA AZUL AVENIDA DE LAS ESTRELLAS END CDS 31 9,323 68 02-25-22 VIA BADALONA VISTA DEL MAR END CDS 34 18,955 95 02-08-22 VIA BERNARDO CIRCLE VIA BERNARDO ROAD E END CDS 33 1,155 52 03-05-20 VIA BERNARDO DOMINGUEZ RANCH RD W N END CDS 33 20,295 62 03-05-20 VIA BELARMINO VIA ASTURIAS AVENIDA EL CID 33 25,608 30 03-05-20 VIA BUENA SUERTE END OF CDS VIA VALLARTA 37 50,107 68 09-17-15 VIA BURGOS VISTA DEL MAR W END CDS 33 27,401 95 02-08-22 VIA BURGOS VISTA DEL MAR E END CDS 33 10,901 95 02-08-22 VIA BRUMOSA VIA AZAFRAN VIA DEL PALMAR 33 37,036 66 03-05-20 VIA BREVE AVE DE AMOR VISTA DEL AMIGO 33 13,827 59 03-05-20 VIA BRAVO VIA ARRIBA LINDA VIA VERANO 33 25,311 68 09-16-15 VIA CANARIAS VISTA DEL MAR END CDS 33 22,671 95 02-08-22 VIA CABEZA VIA PEPITA END CDS 33 5,390 68 02-24-22
VIA CERESA VIA MADERA END OF CDS 33 12,089 95 02-18-22
VIA CELESTINA VISTA DEL MAR END CDS 33 46,348 95 02-08-22 VIA CAMPANAS VIA AZAFRAN END CDS 33 12,980 64 03-05-20
VIA DE CAMPO PASEO DE TORONTO VIA LEONARDO 33 30,690 68 09-16-15 VIA CANTADA PASEO DE TORONTO VIA BUENA SUERTE 37 41,625 68 09-17-15 VIA CONTENTO VIA CORZO VIA CASCO 33 25,514 68 02-14-22
VIA CONTENTO VIA CORZO END CDS 33 7,964 68 02-14-22
VIA COTA DOMINGUEZ RANCH ROAD W END CDS 33 3,300 69 03-05-20 VIA CORONA FELIPA RD END CDS 33 28,127 89 02-15-22
VIA CARRETAS VIA AZAFRAN END CDS 33 14,663 66 03-05-20
VIA CRISTAL VILLAGE CENTER DR END CDS 33 17,897 68 03-05-20
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VIA CERVANTES N/S AVENIDA EL CID VIA ASTURIAS 33 22,049 68 03-05-20 VIA CERVANTES S/S VIA AGUSTO AVENIDA EL CID 33 35,810 82 10-28-15 VIA CORZO ALDER AVE SAN ANTONIO RD 37 66,156 66 02-14-22 VIA CASCO VIA PIEDRA END CDS 33 10,142 67 02-14-22
VIA CASCO VIA CONTENTO VIA PIEDRA 33 8,250 68 02-14-22
VIA CASTILE VIA SANTANDER END CDS 33 14,201 71 03-05-20 VIA CASTELLON VIA CARTAGENA END CDS 33 9,614 55 03-05-20 VIA DIEGO VIA TOLEDO END CDS 33 27,401 89 03-05-20
VIA DE LA ARDILLA VIA DEL GAVILLAN VIA DEL VENADO 30 6,900 58 03-05-20 VIA DEL ACERO VIA DE LA ESCUELA N END CDS 33 7,425 58 03-05-20 VIA DE LA ESCUELA DOMINGUEZ RANCH ROAD YORBA LINDA BLVD. 34 29,920 29 03-05-20 VIA DEL AGUILA VIA DEL COYOTE END CDS 33 7,590 45 03-05-20 VIA DE LA ROCA VIA DE LA AGUA END CDS 31 7,401 72 02-18-22 VIA DE LA REATA VIA DEL AGUA END CDS 33 8,492 72 02-18-22 VIA DEL BISONTE VIA DEL CAZADOR VIA DEL COYOTE 34 31,620 71 03-05-20 VIA DEL CAZADOR ESPERANZA ROAD DOMINGUEZ RANCH ROAD 37 50,505 88 03-05-20 VIA DEL COYOTE VIA DEL BISONTE VIA DEL CUERVO 34 40,800 69 03-05-20 VIA DEL CORRAL VIA DEL AGUA END CDS 33 24,304 66 03-05-20 VIA DEL CUERVO VIA DEL COYOTE END CDS 33 11,220 62 03-05-20 VIA DEL FIERRO VIA DE LA ESCUELA N END CDS 33 16,500 48 03-05-20 VIA DEL GAVILAN VIA DEL CONEJO VIA DEL BISONTE 33 14,355 57 03-05-20 VIA DEL HALCON VIA DEL COYOTE END CDS 33 10,560 48 03-05-20 VIA DEL LEON VILLAGE CENTER DR VIA DE LA MULA 36 6,436 89 02-24-22 VIA DEL PARQUE DOMINGUEZ RANCH ROAD S END CDS 34 55,420 72 03-05-20 VIA DEL POTRERO VIA DEL VENADO END CDS 33 12,540 33 03-05-20 VIA DEL PUMA VIA DEL COYOTE END CDS 33 8,745 74 03-05-20 VIA DEL TECOLOTE VIA DEL BASONTE END CDS 33 9,900 51 03-05-20 VIA DEL VENADO VIA DEL CONEJO VIA DEL POTRERO 33 4,950 49 03-05-20 VIA DIANZA DOMINGUEZ RANCH RD VIA ONTIVEROS 33 19,305 60 03-05-20 VIA DIEGO CIRCLE VIA DIEGO END CDS 33 3,960 88 03-05-20 VIA DEL AGUA VIA DE LA ROCA YORBA LINDA BLVD 37 52,429 58 02-15-22 VIA DULCINEA VIA MARWAH END CDS 33 9,317 47 03-05-20
VIA DEL CERRO END CDS END CDS 33 49,654 70 02-18-22
VIA DE LA ESPUELA VIA DEL AGUA END CDS 33 7,601 73 02-18-22 VIA DEL PUENTE VIA DEL AGUA VIA DEL CERRO 33 9,900 73 02-18-22 VIA DEL RIO LA PALMA END OF CDS 33 30,409 57 03-30-10
VIA DANIEL VISTA LAGUNA END CDS 33 20,966 95 02-10-22
VIA DONALDO VISTA MONTANA END CDS 33 25,487 95 02-10-22 VIA EL TAJO VISTA DEL MAR E END CDS 33 14,520 95 02-08-22 VIA ESCOBA VIA MARWAH END CDS 33 9,680 76 03-05-20
VIA ESPANA VIA NAVARRA VILLAGE CENTER DR 36 9,000 88 02-24-22 VIA ESPANA VIA LOURDES VILLAGE CENTER DR 33 19,800 64 02-24-22 VIA ESTE PABLO ROAD E END CDS 33 7,260 42 03-05-20
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VIA ESTANCIA VIA FRANCISCO END CDS 33 12,683 36 03-05-20 VIA ESTER VISTA LAGUNA END CDS 33 19,217 95 02-10-22
VIA FRANCISCO VIA DIEGO VIA ESTANCIA 33 9,240 33 03-05-20 VIA GUADALUPE VISTA DEL MAR END CDS 33 49,247 95 02-08-22 VIA GERALDINA VISTA LAGUNA END CDS 33 18,623 95 02-10-22 VIA HABANA VISTA DEL MAR END CDS 33 21,362 95 02-08-22
VIA INFANTA VISTA DEL MAR END CDS 33 9,350 95 02-08-22
VIA INGRESO PONTO DE VISTA PASEO DE LAS PALOMAS 33 25,920 59 03-05-20 VIA ISABELLA VIA MARWAH END CDS 33 13,673 95 02-10-22
VIA JARDIN VISTA DEL AMIGO END CDS 33 15,422 81 03-05-20 VIA LA MANCHA VIA DEL BUEY E END CDS 33 13,530 87 02-24-22 VIA LA NARANJA VIA PEPITA W END CDS 33 20,625 64 02-24-22 VIA LA VIEJA VISTA DEL MAR END CDS 34 29,563 95 02-08-22 VIA LUCIA VIA MARWAH END CDS 33 10,670 95 02-10-22
VIA LOMAS DE YORBA RR BRIDGE S/S LA PALMA N/S 54 36,612 76 09-16-15 VIA LOMAS DE YORBA RR BRIDGE N/S PASEO DE TORONTO S/S 54 85,212 72 09-16-15 VIA LOMAS DE YORBA PASEO DE TORONTO N/S AVE DE MARCIA W/S 36 119,660 83 09-16-15 VIA LOMAS DE YORBA AVE DE MARCIA W/S BOX CANYON CT W/S 36 57,168 83 09-16-15 VIA LOMAS DE YORBA BOX CANYON CT W/S COPPER CANYON N/S 36 38,268 79 09-16-15 VIA LOMAS DE YORBA COPPER CANYON N/S LA PALMA 33 25,146 74 09-16-15 VIA LENARDO CAMINO VISTA VIA ARRIBA LINDA 35 85,225 69 09-16-15 VIA LINARES VISTA DEL MAR END CDS 33 14,300 95 02-08-22 VIA LERIDA VISTA DEL MAR END CDS 33 18,227 95 02-08-22
VIA LOURDES VIA LA NARANJA VIA ESPANA 27 7,709 68 02-24-22 VIA LAS BRISAS VIA LOMAS DE YORBA CAMINO DORADO 37 25,826 68 09-17-15 VIA LAS VILLAS VISTA DEL MAR END CDS 34 23,409 95 02-08-22 VIA LUGO DOMINGUEZ RANCH ROAD W END CDS 33 5,610 67 03-05-20 VIA MARCOS CARLOS ROAD END CDS 33 26,906 47 03-05-20
VIA MARIPOSA AVENIDA ANTIGUA END CDS 34 78,200 69 03-05-20 VIA MADERA LAKEVIEW AVE END OF CDS 33 26,840 95 02-18-22 VIA MADRID VIA PAMPLONA VIA DEL BUEY 33 13,200 71 02-24-22 VIA MAGDALENA VISTA DEL MAR END CDS 33 18,689 95 02-08-22 VIA MARGARITA VISTA LAGUNA END CDS 33 17,171 95 02-10-22 VIA MIGUEL VIA ESPANA END CDS 33 16,511 66 02-24-22
VIA MELINDA CAMINO FAMOSA VIA CANTADA 37 28,490 68 09-17-15 VIA MANRESA VISAT DEL MAR END CDS 34 18,445 95 02-08-22 VIA MANZANILLO VISTA DEL MAR END CDS 34 38,029 95 02-08-22 VIA MONITA VIA MIRAMAR W END CDS 34 39,100 95 02-08-22
VIA MIRAMAR VISTA DEL MAR VIA NATILE 33 9,669 95 02-24-22 VIA MARIANO FELIPA RD END OF CDS 33 12,914 66 02-15-22
VIA MARISA VIA CORZO END CDS 33 17,006 59 03-01-22
VIA MARWAH E/S VILLAGE CENTER DR VILLAGE CENTER DR 42 123,882 64 03-05-20 VIA MARWAH W/S VILLAGE CENTER DR VIA LUCIA 38 21,280 95 03-01-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VIA MARWAH W/S VIA LUCIA VISTA MONTANA 38 32,300 95 03-01-22 VIA ANGELINA S END CDS N END CDS 33 35,464 95 02-10-22
VIA ANGELINA E END CDS W END CDS 33 32,428 95 02-10-22
VIA NIETOS YORBA RANCH END OF STREETS 33 40,705 65 03-05-20 VIA NORIEGA DOMINGUEZ RANCH ROAD W END CDS 33 14,850 66 03-05-20 VIA NOPALES VIA MARWAH END CDS 33 8,525 66 03-05-20
VIA NATALIE VIA MIRAMAR W END CDS 33 33,000 95 02-08-22 VIA NUEVA CAMINO FAMOSA CAMINO TECATE 33 7,397 69 09-17-15 VIA NAVARRA VIA DEL BUEY VIA ESPANA 33 12,540 73 02-24-22 VIA OESTE PABLO ROAD W END CDS 33 5,610 37 03-05-20
VIA ONTIVEROS VIA SEPULVEDA S END CDS 33 15,180 55 03-05-20 VIA PIEDRA VIA CORZO YORBA LINDA BLVD 33 19,206 72 02-14-22 VIA PERLA TRAILSIDE DRIVE END CDS 33 14,531 70 03-05-20 VIA PAMPLONA VIA ESPANA VIA MADRID 33 8,189 73 02-28-22 VIA PRIMARIA END CDS VIA MARWAH 33 53,669 73 03-05-20
VIA PASA VISTA DEL MAR END CDS 33 8,690 95 02-08-22
VIA PIZARRO VIA DEL BUEY END CDS 33 8,558 71 02-24-22
VIA RICARDO VISTA MONTANA END CDS 33 16,907 95 02-10-22 VIA ROJA CALLE BONITA AVENIDA DE LOS SUENOS 33 24,260 72 02-25-22 VIA RAMON N/S END CDS END CDS 33 34,573 28 03-05-20
VIA RAMON E/S YORBA RANCH RD VIA RAMON 33 6,831 85 03-05-20 VIA ROBLE AVENIDA ANTIGUA CALLE ENTRADA 33 7,260 34 03-05-20 VIA ROSA DOMINGUEZ RANCH ROAD N END CDS 33 2,970 64 03-05-20 VIA SARA VIA MONITA S END CDS 26 2,860 95 02-08-22
VIA SEPULVEDA YORBA RANCH ROAD S END CDS 33 20,790 59 03-05-20 VIA SAMUEL VISTA MONTANA END CDS 33 19,580 95 02-10-22
VIA SONADOR VIA CARTEGENA END CDS 33 31,427 73 03-05-20 VIA SAN LUCAR VISTA DEL MAR END CDS 34 34,493 95 02-08-22 VIA SONRISA PASEO DE LAS PALOMAS AVENIDA DE LOS REYES 33 15,279 62 03-05-20 VIA SANTA MARIA N/S VILLAGE CENTER VISTA DEL MAR 48 13,128 95 02-08-22 VIA SANTANA YORBA RANCH END OF STREETS 33 45,408 89 03-05-20 VIA SUSANNAH AVENIDA EL CID END CDS 33 10,307 80 03-05-20 VIA TEODOCIO FELIPA RD END CDS 33 17,501 65 02-15-22
VIA TOLEDO PASEO DE LAS PALOMAS VIA DIEGO 33 16,406 85 03-05-20 VIA TALAVERA VISTA DEL MAR END CDS 33 16,676 95 02-08-22 VIA TALAVERA VISTA DEL MAR END CDS 33 28,732 95 02-08-22 VIA TOMAS DORINDA RD END OF CDS 32 12,685 59 02-15-22
VIA TENORIA VISTA DEL MAR END CDS 33 14,663 95 02-08-22 VIA TAPASTE VIA MARWAH END CDS 33 11,693 70 03-05-20
VIA TARARA VISTA DEL MAR END CDS 33 19,217 95 02-08-22
VIA TRINIDAD VIA MIGUEL END CDS 33 20,075 65 02-24-22
VIA TARRAGONA VISTA DEL MAR END CDS 34 32,453 95 02-08-22 VIA TORRALBA VISTA DEL MAR END CDS 34 15,317 95 02-08-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VIA TROVADOR VISTA DEL MAR END CDS 33 28,886 95 02-08-22 VIA VIGO VIA TALAVERA END CDS 33 9,020 95 02-08-22
VIA VICENTE W END CDS E END CDS 33 28,402 64 03-05-20
VIA VICENTE YORBA RANCH ROAD VIA VICENTE 33 7,260 38 03-05-20 VIA VALLARTA END OF CDS VIA MELINDA 37 73,565 68 09-17-15 VIA VIENTO AVENIDA DE LOS ARBOLES END OF CDS 33 13,211 78 02-25-22 VIA VENTOSA CAMINO DE LOS CANTOS END CDS 33 15,290 55 03-05-20 VIA VARADERO VISTA DEL MAR END CDS 33 23,705 95 02-08-22 VIA VERANO PASEO DE TORONTO VIA ARRIBA LINDA 33 34,056 70 09-16-15 VIA VENTANA AVENIDA DE LOS REYES END CDS 33 14,734 38 03-05-20 VIA ZOPAPO BALARMINO END CDS 33 11,858 60 03-05-20
VIA ZARAGOZA VISTA DEL MAR END CDS 33 30,107 95 02-08-22 VIA GLORIA VISTA MONTANA VIA ANGELINA 33 7,986 95 02-10-22 VIA JUANA VISTA MONTANA END CDS 33 15,554 95 02-28-22
VINWOOD LN VALLEY VIEW CIR HARLAN DR 33 29,700 70 02-09-22 VISTA LAGUNA PASEO DE LAS PALOMAS VILLAGE CENTER DR 24 70,560 95 02-07-22 VISTA LAGUNA VILLAGE CENTER DR PASEO DE LAS PALOMAS 24 80,360 97 02-07-22 VISTA MENDOZA CAMINO CERMENON CDS 33 22,549 81 02-11-22 VISTA MONTANA VISTA LAGUNA W/S VIA GLORIA S/S 40 89,648 97 02-10-22 VISTA MONTANA VIA GLORIA S/S VISTA LAGUNA N/S 40 99,152 97 02-10-22 VISTA MORAGA VALLEY VIEW CIR CAMINO CERMENON 32 15,520 70 02-11-22 VISTA LN RANCHO LN END CDS 33 8,261 87 02-10-22
VIA VIRGINIA VISTA MONTANA VIA ANGELINA 33 8,019 95 02-10-22 VILLA GRANDE DR LA ENTRADA DR BASTANCHURY RD 33 14,091 80 02-07-22 VILLAGER CIR MANOR VIEW DR END CDS 33 18,491 95 02-09-22 VALLEY VIEW AVE ORANGE DR N/S YORBA LINDA N/S 60 77,640 65 02-14-22 VALLEY VIEW AVE LAKEVIEW AVE S/S VALLEY VIEW CIR N/S 50 45,350 89 02-14-22 VALLEY VIEW AVE VALLEY VIEW CIR N/S DIEMER RD S/S 45 49,715 82 02-14-22 VALLEY VIEW AVE DIEMER RD S/S RED PINE RD N/S 30 63,430 88 02-14-22 VALLEY VIEW AVE RED PINE RD N/S CAMINO CABRILLO N/S 30 67,180 87 02-14-22 VALLEY VIEW AVE CAMINO CABRILLO N/S VALLEY VIEW AVE W/S 30 80,720 91 02-14-22 VENECIA LN ORLANDO DR END CDS 33 17,765 68 02-02-22
VAN GOGH WAY PICASSO DR DELACROIX WAY 33 48,081 76 09-17-15 VOLTERRA LN TUSCANY WY CDS 33 18,260 95 02-04-22
VERONA LN CASIANO DR END CDS 36 25,757 92 02-02-22
VISTA DEL AMIGO VIA JARDIN PUNTO DE VISTA 33 45,132 69 03-05-20 VISTA GLEN CIR RIM CREST DR END CDS 29 31,503 70 02-24-22 VISTA RANCH DR EL CAJON AVE END CDS 33 9,548 71 02-10-22 VISTA VIZCAINO CAMINO CABRILLO CAMINO AYALA 33 6,765 87 02-11-22 VISTA CANTORA VIA ARRIBA LINDA END OF CDS 33 32,648 68 09-16-15 VISTA DEL MAR E/B PASEO DE LAS PALOMAS 80FT N OF VIA VADERO 20 11,980 97 02-07-22 VISTA DEL MAR E/B 80 FT N OF VIA VARADERO 150 FT SO OF MANZANILLO 20 33,760 97 02-07-22 VISTA DEL MAR E/B 150 FT S. OF MANZANILLO VIA LERIDA 20 83,540 97 02-07-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
VISTA DEL MAR E/B LERIDA VILLAGE CENTER 20 19,420 97 02-07-22 VISTA DEL MAR W/B VILLAGE CENTER VIA LERDIA 20 20,520 94 02-07-22 VISTA DEL MAR W/B LERIDA VIA SANLUCAR 20 81,960 97 02-07-22 VISTA DEL MAR W/B VIA SANLUCAR VIA VARADERO 80FT N 20 36,300 94 02-07-22 VISTA DEL MAR W/B VIA VARADERO 80FT N PASEO DE LAS PALOMAS 20 12,300 94 02-07-22 VISTA DEL NORTE AVE DE LOS ARBOLES END OF CDS 33 23,314 73 02-25-22 VISTA DEL SOL END OF CDS AVENIDA DE LAS ESTRELLAS 33 42,284 73 07-23-15 VISTA LAMPARA VIASTA CANTORA CAMINO CALCUROSO 33 11,253 68 09-16-15 VIEW PARK DR SAN ANTONIO RD END CDS 37 47,499 92 02-14-22 WATSON WY BLACK GOLD DR HOGAN DR 37 48,840 69 02-05-22
WABASH AVE ROSE DR PROSPECT AVE 33 48,213 80 02-11-22
WABASH AVE PROSPECT E/S THIRD ST 42 54,004 82 02-11-22
WOODCREST DR YORBA LINDA BLVD KENNON DR 33 28,385 95 02-23-22 WOODHAVEN DR MEADOWVIEW DR END CDS 33 11,726 81 02-07-22 WOODLAND AVE SLEEPING OAK DR FOXTAIL DR 33 19,338 83 09-16-15 WEATHERLY DR CASA LOMA AVE RAINBOW LN 33 15,345 90 02-08-22 WEBB PL END CDS END CDS 33 22,858 95 02-23-22
WELSH PONY LN RED ROAN LN CDS 30 29,269 76 02-04-22
WESTMORELAND DR BUENA VISTA AVE CUMBERLAND CIR 33 28,116 82 02-16-22 WEYBURN AVE ROSE DR ODESSA DR 33 9,735 79 02-10-22
WAGON WHEEL DR STONE CANYON AVE STONE CANYON AVE 33 42,900 95 02-28-22 W HILLS WY SOUTHERN HILLS WY TERRACE LN 33 12,606 84 02-08-22 WHITE OAK DR SCENIC VIEW DR END OF CDS 33 25,784 70 02-18-22 WILLOW CIRCLE RICH HILL WAY END CDS 33 15,686 95 02-25-22 WINDMERE DR BUENA VISTA AVE END CDS 37 37,342 58 02-16-22 WINNERS CIR QUARTER HORSE DR CDS 32 22,309 94 02-05-22
WINTERHAVEN ST END CDS CITY LIMIT 33 22,055 70 02-09-22 WISTERIA DR EUREKA AVE END CDS 33 29,150 76 02-08-22
WILLOW TREE LN ASPEN WAY END CDS 33 11,066 64 02-14-22
WILLOW WAY RICH HILL WAY RICHFIELD ROAD 33 4,620 95 02-25-22 WALNUT CREEK RD END CDS FURNACE CREEK RD 33 27,588 95 02-09-22 WALNUT LANE BUENA VISTA AVE END CDS 37 42,004 74 02-18-22 WALNUT ST THIRD ST END CDS 33 21,065 86 02-11-22
WALNUT ST VALLEY VIEW AVE SECOND ST 37 24,827 86 02-11-22 WALNUT ST SECOND ST THIRD ST 37 22,718 85 02-11-22
WINCHESTER LANE SADDLETREE LANE SANDY HILL 33 9,900 95 02-11-22 WIND SONG CIR RIM CREST DR END CDS 33 8,822 74 02-24-22 WINDY CIRCLE LOTUS AVE END OF CDS 33 17,666 82 09-16-15 WOODCREST CIRCLE YORBA LINDA BLVD END CDS 33 7,205 95 02-10-22 WESTWOOD LN STARLIGHT DR END OF CDS 33 10,835 65 02-23-22 WATERFORD DR DUNROBIN WAY END OF CDS 33 11,462 74 02-18-22 YELLOWSTONE AVE VAN BUREN ST RAINTREE ST 33 22,704 70 02-24-22 YORKSHIRE AVE RAINTREE ST VAN BUREN ST 33 22,572 95 02-24-22
Appendix B
Local Street Listing - Current Conditions
Sorted by by Street Name
Local
Street Name From To Width of Segment Area Current PCI Most Recent Inspection Date
YORBA RANCH N/B ESPERANZA ROAD S/S TRAIL SIDE S/S 25 67,500 84 03-01-22 YORBA RANCH N/B TRAIL SIDE S/S CARLOS RD S/S 25 60,500 85 03-01-22 YORBA RANCH N/B CARLOS RD S/S YORBA LINDA BLVD S/S 25 48,600 83 03-01-22 YORBA RANCH S/B YORBA LINDA BLVD S/B VIA RAMON S/S 25 60,925 75 02-23-22 YORBA RANCH S/B VIA RAMON S/S PASEO DE LAS CUMBRE S/S 25 56,800 54 02-23-22 YORBA RANCH S/B PASEO DE LAS CUMBRE S/S ESPERANZA RD S/S 25 56,710 62 02-23-22 ZAHARIAS RIDGE LAKEVIEW AVE SARAZEN CT 37 36,075 87 02-10-22
Pavement Management Plan Agency Submittal
Page | 11
XIII. Appendix C – GIS Digital Data
Introduction
The OCTA GIS Section maintains a spatial inventory of transportation infrastructure which mostly consists of major arterial streets, roads, and highways. A key component of road information is pavement condition.
Maintaining an inventory of pavement condition will enhance OCTA’s GIS visualization and analysis capabilities and assist in understanding the transportation investment needs throughout the region. Therefore, a GIS dataset in digital format should be included in this report.
Structure of GIS Data
The GIS dataset must consist of linear geographic features that represent road/street segments. All segments that are part of the report should be included in the GIS dataset. The attribute information of each segment should generally follow the format of the Complete Listing of Current Street Conditions in Appendix B above.
The GIS data requirements are discussed below. Most commercial and open-source GIS software provide industry-standard tools to manage GIS data to meet these requirements.
GIS Digital Data Format
The GIS data must be submitted in either one of the following formats:
• Esri Shapefile, or
• Esri File Geodatabase
Metadata
The GIS data are required to have associated metadata. The minimum metadata items required are:
• Title of Dataset
• Tags (A set of words that can be used by GIS to search for the resource. For example: “pavement”, “transportation”, “roads”)
• Summary (A brief purpose statement of the dataset)
• Description (A brief narrative of the dataset’s content) • Credits (A recognition of those who created or contributed to the resource) Spatial Geometry Type
The spatial geometry of the segment features must be lines that represent the roadway centerline as accurately as possible.
Projection
The GIS data must have spatial reference information and have its coordinate system identified and embedded in or associated with the data file(s). All GIS data submitted to OCTA should be in the following projected coordinate system:
Pavement Management Plan Agency Submittal
Page | 12
• NAD 1983 State Plane California VI FIPS 0406 (US Feet) - More information about this system can be found at: https://spatialreference.org/ref/epsg/nad83-california-zone-6-ftus/ GIS Feature Attributes
The required segment attributes are:
• Street name
• Unique segment identifier (Segment ID from original source if available) • Name of intersecting road at the beginning of a segment • Name of intersecting road at the end of the segment
• Current pavement condition index (PCI)
• Current PCI inspection date
• Length of road segment in feet
• Width of road segment in feet
• Paved area of road segment in square feet or square yards • Projected PCI at end of Seven-Year Road Maintenance and Rehabilitation Plan Additional attributes such as number of through travel lanes, direction of travel and pavement surface type may be provided. An example of a GIS attribute table for road segments is shown below (Note that there are additional attributes such as surface, functional class, and number of travel lanes).
Pavement Management Plan Agency Submittal
Page | 13
XIV. Appendix D – Quality Assurance/Quality Control Plan When performing data collection in any field, the need for quality control is paramount as it is essential for accurate planning, analysis and design. This is particularly true for collecting pavement distress data for a pavement management system.
The Quality Assurance/Quality Control (QA/QC) Plan establishes minimum quality standards for performance and procedures for updates of the pavement management system.
If applicable, utilize the space below to include information on the agency’s QA/QC policies:
City of Yorba Linda
4845 Casa Loma Avenue
Yorba Linda, CA 92886
Quality Control Plan
2022 Citywide Pavement Management Program / PMP
01/31/2022
Fountain Valley, CA
17050 Bushard St.
Suite 200
Fountain Valley, CA 92708
The content of this report is the confidential property of NCE and should not be copied, modified, retransmitted, or used for any purpose except with NCE’s written
authorization.
City of Yorba Linda
Pavement Management Program Update 2021/2022
Quality Control Plan
i
TABLE OF CONTENTS
1. Introduction ........................................................................ 1
1.1. Objectives..................................................................................... 1
1.2. Structure ...................................................................................... 1
2. Quality Control Plan ............................................................ 2
2.1. Condition Inspection Procedures ....................................................... 2
2.2. Data Collection Accuracy Requirements ............................................. 3
2.3. Inspector Qualifications and Experience............................................. 4
3. Safety Procedures ............................................................... 5 Appendix C1 Resumes of Field Inspectors
City of Yorba Linda
Pavement Management Program Update 2021/2022
Quality Control Plan
1 1. Introduction
The need for quality control is paramount when performing data collection in any field, as it is essential for accurate planning, analysis, and design. NCE’s Quality Assurance Management Plan (QAMP) affirms that:
NCE is dedicated to achieving technical and management excellence and to delivering professional engineering and environmental services that meet or exceed our clients' needs. NCE's Quality Assurance/Quality Control (QA/QC) Program is designed to achieve these goals. This QA Management Plan (QAMP) describes NCE's QA Program, which is based on four principles: client satisfaction, employee participation, problem prevention, and continuous quality improvements.
NCE's QAMP establishes minimum quality standards for performance and procedures for assuring that our clients receive quality service. It requires the participation of employees at every level. It encourages Project Managers and technical staff to take pride in their work and to assume responsibility for ensuring that the work is done correctly the first time. The QAMP is designed to reduce the incidence of quality-related and, where necessary, results in corrective actions and modification of work procedures to minimize the incidence of future problems.
NCE has also prepared detailed and specific quality control plans (QCPs) for projects; the most notable example is for the Long Term Pavement Performance (LTPP) – Western Regional Support Contract for the Federal Highway Administration. This is a 150-page document that covers data collection on highways, including deflection, profile, pavement distresses, traffic, maintenance and rehabilitation history, materials testing and sampling as well as document control.
1.1. Objectives
This document constitutes a formal QCP for the City of Yorba Linda. It was prepared on January 20, 2022. The QCP focuses on data collection issues as part of the pavement management update. Specifically, it is intended for the 2022 Pavement Management Update.
The focus is on the collection of network-level pavement distress data. As defined by the National Cooperative Highway Research Program Synthesis 401 Quality Management of Pavement Data Collection, “Network-level data collection involves collection of large quantities of pavement condition data, which is often converted to individual condition indices or aggregated into composite condition indices.”
1.2. Structure
The following components are addressed in this QCP:
Condition inspection procedures,
Data collection accuracy requirements,
Inspector qualifications and experience, and
Safety procedures.
City of Yorba Linda
Pavement Management Program Update 2021/2022
Quality Control Plan
2 2. Quality Control Plan
2.1. Condition Inspection Procedures
The governing document for performing condition surveys for the City of Yoba Linda is ASTM D6433-11, “Standard Practice for Roads and Parking Lots Pavement Condition Index (PCI) Surveys.” Both asphalt concrete (AC) and Portland cement concrete (PCC) pavements are included in this protocol. The following distresses are collected for each pavement type.
AC Pavements PCC Concrete (Jointed) Pavements
1. Alligator (fatigue) cracking
2. Bleeding
3. Block cracking
4. Bumps and sags
5. Corrugation
6. Depression
7. Edge cracking
8. Joint reflection cracking
9. Lane/shoulder drop-off
10. Longitudinal and transverse cracking
11. Patching and utility cut patching
12. Polish aggregate
13. Potholes
14.Railroad crossing
15.Rutting
16.Shoving
17.Slippage cracking
18.Swelling
19.Raveling
20.Weathering
1. Blowup/buckling
2. Corner breaks
3. Divided slab
4. Durability (“D”) cracking
5. Faulting
6. Joint seal damage
7. Lane/shoulder drop-off
8. Linear cracking
9. Patching (large) and utility cuts
10. Patching (small)
11. Polished aggregate
12. Popouts
13. Pumping
14. Punchout
15.Railroad crossing
16.Scaling, map cracking, and crazing
17.Shrinkage cracks
18.Spalling (corner)
19.Spalling (joint)
Any exceptions to the ASTM procedures will be discussed with the City before any inspections are performed. Exceptions are usually related to distresses or situations that are not covered in the manuals. Examples include slippage cracks, roller check marks, or edge cracking on streets with no curbs and gutters. Others include the raveling of surface seals or surveying the open-graded AC mixes. Any modifications will be documented and submitted to the City for approval.
All distress or condition inspections are performed as walking inspections, and a minimum 10% sampling rate is utilized. Field crew is typically a certified technician for lower-volume roads and additional technicians will join the inspection team when surveying on highervolume facilities such as arterials. The sample units for this project will be based upon the length and width of the street sections. This data will be collected to match the existing management sections of StreetSaver®.
City of Yorba Linda
Pavement Management Program Update 2021/2022
Quality Control Plan
3 2.2. Data Collection Accuracy Requirements
The accuracy required for data collection has two components, both of which are further described in the following paragraphs.
Re-inspections
PCI comparisons with past inspections
2.2.1 Re-Inspection “Check”
At least 5% of all inspections are randomly re-inspected by other team members. A different inspector will review these sites and determine the revised pavement distress measurements.
If the initial inspection is determined to be inaccurate, the original inspector is given refresher training before being allowed to continue with any further inspections. Should the data be inaccurate for a certain day, all the data for that day will be re-inspected following refresher training to ensure accuracy.
Acceptability Criteria
At the time of re-inspection, the actual distresses will be re-inspected and verified, and any corrections made, if necessary. Distress types and severities must be the same and remeasured quantities must be within ±10% of the original measured quantity.
If corrections are required on more than 10% of the re-inspected sample units, then an additional 5% will be re-inspected. This will continue until more than 95% of the re-inspected sections meet the acceptability criteria.
2.2.2 PCI Comparisons with Past Inspections
As another level of quality control, the new PCIs are compared with the previous PCIs. If they differ by more than ±10 PCI points, these sections are automatically flagged for further investigation.
If PCI Increases 10 points:
The section is investigated to see if maintenance and rehabilitation (M&R) activities have been performed since the last inspection, but have not been recorded. This can only be resolved with feedback from the City. Typical M&R activities that may have occurred include:
Crack sealing – changes medium- or high-severity cracking to low-severity. Patching – alligator cracking has been removed and patched, so that the resultant PCI is increased.
Surface seals.
Overlay.
City of Yorba Linda
Pavement Management Program Update 2021/2022
Quality Control Plan
4 Therefore, an up-to-date M&R history file in the StreetSaver® database is desirable, both for historical accuracy as well as to provide additional quality control.
If PCI Decreases 10 points:
The section is checked to see if the average deterioration rate (usually 3 to 4 points per year) is exceeded. If the drop in PCI is within the acceptable range, no further action is required. If the drop is more than the acceptable range, a re-inspection will be performed. The default performance curves in the pavement management software form the basis for acceptability.
2.3. Inspector Qualifications and Experience
All NCE’s inspectors are required to attend formal training on condition distress inspections.
For example, any of NCE’s inspectors working on the LTPP project are required to attend a week-long training workshop every year to maintain their certifications. The Regional Transportation Commission (RTC) of Washoe County requires inspectors to be calibrated prior to performing any work using the ASTM D6433 protocols (also known as the pavement management inspections).
For pavement management (or ASTM D6433) inspections, NCE’s technicians underwent the Orange County Transportation Authority technician prequalification exercise held in January 2021/2022.
Similarly, in agencies that use the StreetSaver® system, NCE’s inspectors attend the distress training conducted by the Metropolitan Transportation Commission (MTC). After the formal training, technicians work with an experienced inspector before they are allowed to work on their own. Within the first month of working on their own, up to 20% of their work is checked weekly. Any necessary corrections are made immediately.
Finally, NCE conducts a one-day training and calibration workshop for all NCE staff involved with data collection. This is conducted once a year. The following table lists the inspectors assigned to this project and their most recent training date.
Inspector Name Date of Distress
Training
Training
Conducted by:
Joseph De Leon November 3, 2021 Lisa K. Senn
Franc Escobedo November 3, 2021 Lisa K. Senn
Sharlan Dunn November 3, 2021 Lisa K. Senn
Resumes of technicians utilized on this project are included in Appendix A1.
City of Yorba Linda
Pavement Management Program Update 2021/2022
Quality Control Plan
5 3. Safety Procedures
NCE administers a health and safety program in compliance with the Nevada Occupational Safety and Health Act (Section 618.383) and California Occupational Safety and Health Administration (OSHA) Title VIII, Section 3203. The program is documented in NCE's Workplace Safety Program Manual, which can be provided upon request.
Generally, the safety procedures include:
Inspectors wear a Class 2 safety vest at all times.
Flashing beacons are placed on all vehicles utilized for inspections. Stopped vehicles are to be parked at locations away from moving traffic (nearby parking, shoulders etc.).
For higher volume streets, inspectors usually use the sidewalk, and move in the face of traffic when conducting survey. This will furnish them with more time and provides them with better chances in escaping a dangerous situation involving incoming vehicles.
On streets where there is a high volume of traffic or high speeds, additional measures may be necessary, such as:
Inspections occur during off-peak periods or on weekends. An additional inspector attends to watch out for traffic. Traffic flaggers are provided in extreme cases.
In extreme cases where it is not possible to walk on the pavement surface, inspections will be performed from sidewalks or raised medians. However, this is extremely rare for city or county roads/streets; this is most often encountered on state highways, and lane closures are the most likely option in that circumstance.
All NCE inspectors are required to take online safety programs annually as administered by “Click Safety.” These classes include:
Workzone Traffic Safety Tips for Construction.
Cal Heat Illness Prevention for all Industry Workers. Cal Person Protective Equipment for Construction.
Appendix C1
Resumes of Field Inspectors
Education
Computer Operations Program,
Computer Learning Center, Los
Angeles, CA, 1983Ͳ84
Network Engineering &
Administrative Program
Computer Learning Center, Anaheim,
CA, 1997
Certified Network Administration
Computer Learning Center, Anaheim,
CA 1997
Registrations and Certifications
OCTA PAVER Certification (expires
2023)
MTC StreetSaver® Rater Certification
Program (expires November 2023)
Joined NCE
2004
Total Years of Experience
22 years
Franc Escobedo
Engineering Field Technician
Franc has over 21 years of experience as a pavement management technician for NCE. He has performed numerous pavement condition inspections throughout California, Idaho and Washington. His experience includes distress collection across various Pavement Management Systems, including the Metropolitan Transportation Commission StreetSaver®, PAVER, Cartographs, and Hansen systems.
Additionally, Franc has completed both the OCTA PAVER and MTC “Distress Identification” courses for both asphalt concrete and portland cement pavements and now assists with the training of agency staff on both courses.
Franc performs all activities relating to pavement data collection using hardcopy forms or tablets. As part of the quality control process, he performs crossͲchecks of data in the PMS database. He regularly performs quality control checks of field collected data and pavement maintenance history to ensure that PMS databases are accurate and upͲtoͲdate.
During this process, he generates detailed reports that are necessary to perform his crossͲ checks of the collected data.
His field experience and expertise are added benefits to agencies during field training.
Listed below are a collection of agencies for which Mr. Escobedo has performed condition inspections – they total over 6,000 centerline miles of roads and streets.
Representative Projects
Projects included various forms of inspections for pavement distress data collection, such as walking, windshield, and/or semiͲautomated.
City and County of San Francisco, As‐Needed Pavement Condition Survey Services, APE15117
City of San Francisco, CA
Engineering Technician. Pavement distress surveyor. Scope: Since 2016, NCE performed condition surveys on almost 1,000 centerline miles of streets. A particular challenge in 2016 and 2017 was the change in distress protocols when weathering and raveling were split into two different distresses; this resulted in an increase of the Pavement Condition Index, further confirmed by a research study. Project cost: $868,796.
City of Berkeley, Pavement Management System Updates
City of Berkeley, CA
Engineering Technician. Pavement distress surveyor. Scope: NCE is updating StreetSaver® and providing a fiveͲyear paving plan for 2018 – 2022. For the first four years the City will select streets for treatment based on criteria identified under Measure M. Project cost:
$49,900.
County of Sonoma Pavement Management Update
Sonoma County, CA
Engineering Technician. Pavement distress surveyor. Scope: The scope included updating existing pavement management system annually, developing pavement treatment strategies, conducting budgetary analysis, and providing nonͲpavement needs assessment.
Project cost: $823,981.
Franc Escobedo
2 | Page
City and County of San Francisco As‐Needed Pavement Engineering Services, San Francisco International Airport (SFIA), City of San Francisco, CA
Engineering Technician. Pavement distress surveyor. Scope: Since 2011, NCE has provided onͲcall pavement consultant services on a very complex airfield environment under tight security, conducted forensic analysis on the portland cement concrete (PCC) apron areas, and implemented the PAVER™ PMS. NCE performed the pavement designs for Runway 10RͲ28L, Plot 40, and Plot 12, determined the structural adequacy and performed mechanistic pavement designs using FAARFIELD for Runways 1L/19R and Taxiways E, F, and L. Determined the ACN/PCN for all runways and taxiways. NCE conducted forensic analysis on a new taxiway exhibiting premature largeͲscale reflective block cracking and rutting at Boarding Area A and dimpling of Taxiways B and M. NCE designed a high stability asphalt concrete mix to solve this problem. Developed mitigation plan for premature failure of thinͲbonded PCC overlay on accessroads Developed construction guidelinesfor long lasting longitudinal joints within asphalt concrete pavements.
Updated the PAVER™ Airport PMS and performed automated distresssurveys as per ASTM D5340. Digital images were collected, and the information was used to update SFIA’s GIS and asset managementsystem. Prepared finalreports on the funding and maintenance needs for the next 20 years for the Federal Aviation Administration. NCE is currently providing similar pavement services to SFIA as a subconsultant through 2022. Project cost: $1.2 million.
County of Orange Program Management System Updates
Orange County, CA
Engineering Technician. Pavement distress surveyor. Scope: Scope includes verifying the road inventory for a road network (674 centerline miles), surveying the roads using ASTM D6433Ͳ11 protocols, updating the maintenance history, developing maintenance strategies, performing multiple budgetscenarios, linking to a GIS shapefile, developing a sevenͲyear work plan, and preparing reports.
Concurrent with the pavement condition survey, mobile data collection units gathered highͲresolution 360 degree geoͲreferenced rightͲofͲway street level digital imagery along with 3D point cloud data. Assets collected included markings,signs, curb ramps,signals, and drainage features. Work provided from 2009Ͳ2020. Project cost: $2.3 million.
Pavement Management
Pavement Management Inspections
Engineering Field Technician
Ada County, Idaho
Agoura Hills
Aliso Viejo
Antioch
Auburn, WA
Anaheim
Bakersfield
Baldwin Park
Bell
Brentwood
Buena Park
Burbank
Camarillo
Campbell
Carmel
Carson
Chula Vista
Commerce
Contra Costa
County
Corona
Cudahy
Cypress
Dana Point
Diamond Bar
Dinuba
Downey
East Palo Alto
El Centro
Elk Grove
Encinitas
Fairfield
Fremont
Fresno County
Fullerton
Hayward
Highland
Hillsborough
Humboldt County
Inyo County
La Habra
Lake Forest
Las Vegas
Lemon Grove
Livermore
Mammoth Lakes
Manhattan Beach
Marina
Marin County
Martinez
Mendocino County
Milpitas
Mission Viejo
Mono County
Monterey
Monterey County
Moreno Valley
Mountain View
Napa County
Newport Beach
Oakland
Orange
Orange County
Oxnard
Pacific Grove
Palm Springs
Poway
Redwood City
Richmond
Rogue River
National Forest
San Bruno
San Clemente
San Diego County
San Francisco
San Marino
San Mateo County
San Ramon
Santa Barbara
Santa Cruz
Santa Cruz County
Santa Maria
Santa Monica
Seal Beach
Siskiyou County
Sonoma County
South Lake Tahoe
Stanislaus County
Stanton
State of Nevada
State of Oregon
State of Washington
Thousand Oaks
Torrance
Tulare
Tuolumne County
Tustin
Umpqua National
Forest
Vallejo
Vernon
Vista
Walnut Creek
West Covina
West Sacramento
Whittier
Yorba Linda
Education
Mendocino College
Registrations and Certifications
OCTA PAVER Certification (expires
2023)
MTC StreetSaver® Rater Certification
Program (expires 2023)
Joined NCE
2017
Total Years of Experience
5 years
Joseph DeLeon
Field Technician
Joseph DeLeon joined NCE in 2017 as a pavement management technician and is experienced in collecting distress data for pavement management systems. Apart from conducting field inspections, he has performed all functions related to data collection and is an active participant in the quality control process. As part of this process, he performs crossͲchecks of data in the PMP database. Joseph has performed quality control checks of field collected data and pavement maintenance history to ensure that PMP databases are accurate and up to date. During this process, he generates detailed reports, needed to help perform his crosschecks of the data collected. Joseph has completed the Orange County Transportation Authority’s (OCTA) PAVER™ ‘Distress Identification’ course for Asphalt Concrete and Portland Cement Pavements. Joseph is also certified by the Metropolitan Transportation Commission (MTC) to perform pavement distress inspections; the certification testing involves passing a rigorous field test to test the inspector’s knowledge of the distress procedures once a year. The Pavement Inspector Certification/Testing covers both ASTM D6433 for PAVER™ and StreetSaver® modified ASTM D6433 distress types.
Representative Projects
Pavement Asset Management
Pavement Condition Surveys
Various Cities and Counties, CA
Field Technician. Listed below are a collection of agencies that he has performed condition inspections. Projects included various forms of inspections for pavement distress data collection, such as walking, windshield and/or semiͲautomated Some of his current/past PMP/PMS clients include.
Baldwin Park
Buena Park
Clearlake
Downey
El Cajon
Elk Grove
Fairfield
Highland
Garden Grove
Kings County
Lake County
Lake Forest
Lakeport
Martinez
Oakland
Orange City
Orange Cove
Pacific Grove
San Buenaventura
Sand City
Santa Ana
Sonoma County
South Gate
Stockton
Thousand Oaks
Torrance
Ventura
Pavement Management System
County of Sonoma, CA
Field technician. Responsible for collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected rural mountain roads and residential streets in East Sonoma County.
Pavement Management System
City of Elk Grove CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential, collector and arterial streets in Elk Grove.
Joseph DeLeon
2 | Page
Pavement Management System
City of Stockton, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected urban arterials and residential streets in Stockton.
Pavement Management System
City of Martinez, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected urban arterials and residential streets in Martinez.
Pavement Management System
City of San Buenaventura, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected urban collectors and arterials and residential roads in Ventura.
Pavement Management System
City of Torrance, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Inspected urban arterials in Torrance.
Pavement Management System
City of El Cajon, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Inspected urban arterials and residential streets in El Cajon.
Pavement Management System
City of Buena Park, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Inspected urban arterials and residential streets in Buena Park.
Pavement Management System
City of Lakeport, City of Clearlake, County of Lake, CA Field Technician. Responsible for collecting distress data for AC surfaces according to the MTC8 system. Inspected rural mountain roads, rural residential roads and rural arterials in the cities of Lakeport, Clearlake and Lake County.
Database Creation
County of Santa Cruz, CA
Field Technician. Responsible for collecting distress data for AC surfaces according to the MTC8 system. Inspected rural mountain roads, rural residential roads and rural arterials in Central Santa Cruz County. This data was modified off three separate paper databases which NCE merged into one StreetSaver® database.
Database Creation
City of Sand City, CA
Field Technician. Responsible for collecting distress data for AC surfaces according to the MTC8 system. Inspected industrial collectors for the City of Sand City. This data was modified off an old paper database used by Monterey County to create a StreetSaver® database for Sand City.
Pavement Management System
City of Pacific Grove, CA
Field Technician. Responsible for collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential and collector streets in Pacific Grove.
Joseph DeLeon
3 | Page
Pavement Management System
City of King City, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential, collector and arterial streets in Pacific Grove.
Pavement Technical Assistance Program (PTAP)
City of Fairfield, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential, collector and arterial streets in Fairfield.
Pavement Technical Assistance Program (PTAP) / Quality Control (QC) City of Oakland, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential, collector and urban arterial streets in Northern, Southeast, Downtown and Central Oakland including Jack London Square and Lake Merritt. Also conducted quality control on residential and arterials in Western Oakland.
Control Sections
City of Anaheim, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Inspected control sections for a prior automated survey.
Distress Data Quality Control
City of Cypress, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Conducted windshield inspections on fresh slurry seals in residential Cypress.
Control Sections
City of Thousand Oaks, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Inspected control sections for a prior automated survey.
Pavement Technical Assistance Program (PTAP)
City of Yuba City, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential, collector and arterial streets in Yuba City.
Pavement Technical Assistance Program (PTAP) / Quality Control (QC) County of Marin, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the MTC8 system. Inspected residential, collector and arterial streets in Marin County. Conducted quality control.
Novato Sidewalks
City of Novato, CA
Field Technician. Collected and catalogued sidewalk distresses into a GIS pointͲcloud using a TRIMBLE device with a modified version of MTC8.
Control Sections
City of Hanford, City of Lemoore, County of Kings, CA
Field Technician. Collecting distress data for AC/PCC surfaces according to the ASTM19/20 system. Selected and inspected control sections in the cities of Hanford, Lemoore and parts of Kings County for a prior automated survey.
Presidio Coring
City and County of San Francisco, CA
Field Technician. Operated a coring rig to collect cores and soil samples of 18th century streets in The Presidio.
Pavement Management Plan Agency Submittal
Page | 14
XV. Appendix E – Pavement Management Data Files
The Pavement Management data files shall be submitted to OCTA in spreadsheet format. This must include the following information:
• Street name and limits for all public streets
• Street identifiers (Branch ID, Section ID)
• Direction (if applicable)
• Beginning and ending of each section
• Length, widths, and true areas
• Functional Classification (MPAH, Local)
• Number of travel lanes
• PCI and date of inspection
• Type of recommended treatment
• Cost of recommended treatment
• Street geometry as linear features
The Pavement Management data files are attached here on a CD/flash drive, or included as Appendix D
PUBLIC WORKS DEPARTMENT
DATE: JUNE 21, 2022
TO: HONORABLE MAYOR AND MEMBERS OF THE COUNCIL
FROM: JAMIE LAI, P.E., PUBLIC WORKS DIRECTOR/CITY ENGINEER PREPARED BY: RICK YEE, P.E., DEPUTY PUBLIC WORKS DIRECTOR SUBJECT: APPROVE PROFESSIONAL SERVICES CONTRACT WITH BKF
ENGINEERS FOR YORBA LINDA BOULEVARD IMPROVEMENTS FROM
IMPERIAL HIGHWAY TO LAKEVIEW AVENUE
RECOMMENDATION
It is recommended that the City Council:
1. Approve a Professional Services Contract with BKF Engineers in the amount of $429,132 for the Yorba Linda Boulevard Improvements from Imperial Highway to Lakeview Avenue (SI201001); and
2. Authorize the City Manager to approve additional expenditures of up to $64,370 (15% of the agreement value) in contract contingencies for potential additional services and unanticipated work that may arise.
BACKGROUND
The proposed project improvements on Yorba Linda Boulevard are intended to improve circulation through the intersections with Imperial Highway and Lakeview Avenue. Due to the close proximity of the two intersections and the number of turn movements at the intersection and driveways in the immediate vicinity, prior analyses have shown the general circulation and intersection capacity improves significantly from the addition of 2nd left turn pockets in the east-west direction. The project will allow more throughput of vehicles through the intersections within the same cycle time of the intersection timing. The project improvements will entail widening of the southerly edge of the roadway to accommodate the additional turn pockets. This will require acquisition of additional Right of Way from existing retail properties to the south of Yorba Linda Boulevard. The scope of these services includes both design and environmental documentation. As part of the design scope, the Right of Way limits will be defined, but the acquisition process would be under a separate contract in the future.
DISCUSSION
Staff issued a Request for Proposals (RFP) for design services in March 2022 to the firms that have the required design experienced. The recipients of the RFP were firms that are currently on the City’s on-call consultant list in addition to several firms that had previously
A P P R O V E P R O F E S S I O N A L S E R V I C E S C O N T R A C T W I T H B K F
E N G I N E E R S F O R Y O R B A L I N D A B O U L E V A R D I M P R O V E M E N T S
F R O M I M P E R I A L H I G H W A Y T O L A K E V I E W A V E N U E P a g e | 2
reached out to the City with interest in providing such services. The selection of the consultant is based upon factors such as experience, professional qualifications, and competence as outlined in the Yorba Linda Municipal Code.
A total of four (4) firms submitted proposals, including: Civil Works Engineers, Inc., Harris & Associates, Inc., Psomas, and BKF Engineers. Proposals were reviewed and ranked by the City’s evaluation team. To further aid in the evaluation process, three (3) of the firms were also invited for an in-person interview with the City’s evaluation team. Using the aforementioned evaluation criteria, it was determined that BKF Engineers is best suited to meet the City’s project needs. The project scope involves both design and environmental document preparation and BKF demonstrated depth of relevant experience in design and environmental analysis of similar intersection improvement projects. BKF also demonstrated unique approaches and proposed ideas on value engineering to reduce overall project impacts. BKF has a firm understanding of the City’s design intent and stakeholder concerns.
FISCAL IMPACT
Sufficient funding for the Project (SI201001) is available in the Fiscal Year 2021/2022 and 2022/2023 CIP budgets under account No. 4010050-461620, therefore no appropriation is required as a result of the recommended action. Expenditures for BKF Engineer’s services are eligible for 50% reimbursement under the Orange County Transportation Agency (OCTA) competitive grant fund (Intersection Capacity Enhancement – ICE) received for this project.
ALTERNATIVES
Do not award the professional services contract. However, the competitive grant funds from OCTA require award of contract before June 30, 2022 in order to remain eligible for the funds. If a contract is not awarded before the aforementioned date, the City will need to forego grant funds received.
ATTACHMENTS
1.) Agreement with BKF Engineers
2284/009410-1001
10434958.1 a05/25/22
PROFESSIONAL SERVICES AGREEMENT
FOR
THE YORBA LINDA BOULEVARD IMPROVEMENTS – FROM IMPERIAL
HIGHWAY TO LAKEVIEW AVENUE
THIS AGREEMENT FOR CONTRACT SERVICES (“Agreement”) is made and entered into as of __________, 2022, by and between the CITY OF YORBA LINDA, a municipal organization organized under the laws of the State of California (“City”), and BKF Engineers, a (“a California corporation”) (“Consultant”).
NOW THEREFORE, the parties hereto agree as follows:
SECTION ONE: SERVICES OF CONSULTANT
1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, Consultant shall provide those services related to The Yorba Linda Boulevard Improvements – From Imperial Highway to Lakeview Avenue, as specified in the “Scope of Services” attached hereto as Exhibit “A” and incorporated herein by this reference (the “services” or “work”). Consultant warrants that all services will be performed in a competent, professional, and satisfactory manner in accordance with the standards prevalent in the industry for such services.
1.2 Changes and Additions to Scope of Services. City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to, or deducting from said work. No such work shall be undertaken unless a written order is first given by City to Consultant, incorporating therein any adjustment in (i) the Schedule of Compensation, and/or (ii) the Schedule of Performance, which adjustments are subject to the written approval of the Consultant. It is expressly understood by Consultant that the provisions of this Section 1.2 shall not apply to services specifically set forth in the Scope of Services or reasonably contemplated therein. Consultant hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Consultant anticipates, and that Consultant shall not be entitled to additional compensation therefor.
1.3 Familiarity with Work. By executing this Agreement, Consultant warrants that (a) it has thoroughly investigated and considered the work to be performed, (b) it has investigated the nature and factual context of the work and fully acquainted itself with the conditions pertaining to it, (c) it has carefully considered how the work should be performed, and (d) it fully understands the facilities, difficulties and restrictions attending performance of the work under this Agreement. Should Consultant discover any latent or unknown conditions materially differing from those inherent in the work or as represented by City, and such latent or unknown condition affects Consultant's ability to perform the Work for the Contract Sum (as defined in Section 2.1 below) Consultant shall immediately inform City of such fact and shall not proceed except at Consultant's risk until written instructions are received from the Contract Officer (as defined in Section 4.2 hereof).
2284/009410-1001
10434958.1 a05/25/22 -2-
1.4 Standard of Performance. Consultant agrees that all services shall be performed in a competent, professional, and satisfactory manner in accordance with the standards prevalent in the industry, and that all goods, materials, equipment, or personal property included within the services herein shall be of good quality, fit for the purpose intended.
1.5 Performance to Satisfaction of City. Consultant shall perform all work and tasks comprising the Services to the satisfaction of City within the time specified. If City reasonably determines that any portion of the services is not satisfactory, City shall have the right to take appropriate action, including but not limited to: (a) meeting with Consultant to review the quality of the work and resolve matters of concern; (b) requiring Consultant to repeat unsatisfactory work at no additional charge until they are satisfactory; (c) suspending the delivery of work to Consultant for an indefinite time; (d) withholding payment; and (e) terminating this Agreement as hereinafter set forth.
1.6 Prohibition Against Subcontracting or Assignment. Consultant shall not contract with any entity to perform in whole or in part the work and services required of Consultant herein without the prior express written approval of the City. Neither this Agreement nor any interest herein may be assigned or transferred, voluntarily or by operation of law, without the prior written approval of the City. Any such prohibited assignment or transfer shall be void.
SECTION TWO: COMPENSATION
2.1 Contract Sum. For the services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with Exhibit “B” (the “Schedule of Compensation”) in a total amount not to exceed Four Hundred Twenty-Nine Thousand One Hundred Thirty-Two Dollars ($429,132.00) (the “Contract Sum”), except as provided in Section 1.2. The method of compensation set forth in the Schedule of Compensation may include a lump sum payment upon completion, payment in accordance with the percentage of completion of the services, payment for time and materials based upon Consultant's rate schedule, but not exceeding the Contract Sum, or such other methods as may be specified in the Schedule of Compensation. Compensation may include reimbursement at Consultant's actual cost, without additional overhead or services charge, for actual and necessary expenditures for reproduction costs, transportation expense, telephone expense, and similar costs and expenses when and if specified in the Schedule of Compensation.
2.2 Method of Payment. Unless otherwise provided in the Schedule of Compensation, Consultant shall submit to City no later than the tenth (10th) working day of each month, in the form approved by City, an invoice for services rendered prior to the date of the invoice. Such invoice shall (1) describe in detail the services provided, including time and materials, and (2) specify each staff member who has provided services and the number of hours assigned to each such staff member. Such invoice shall contain a certification by a principal member of Consultant specifying that the payment requested is for work performed in accordance with the terms of this Agreement. City will pay Consultant for all expenses stated thereon which are approved by City pursuant to this Agreement no later than forty-five (45) days after invoices are received by the City.
2284/009410-1001
10434958.1 a05/25/22 -3-
SECTION THREE: PERFORMANCE SCHEDULE
3.1 Time of Essence. Time is of the essence in the performance of this Agreement.
3.2 Schedule of Performance. All services rendered pursuant to this Agreement shall be performed diligently and within the time period established in Exhibit “C” (the “Schedule of Performance”). Extensions to the time period specified in the Schedule of Performance may be approved in writing by the Contract Officer.
3.3 Force Majeure. The time period specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Consultant, including, but not restricted to, acts of God or of the public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, acts of any governmental agency other than City, and unusually severe weather, if Consultant shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the forced delay when and if in his or her judgment such delay is justified, and the Contract Officer's determination shall be final and conclusive upon the parties to this Agreement.
3.4 Term. The term of this agreement shall commence upon execution of this agreement on _________, ____, 2022 and terminate upon completion of the project. This agreement may be extended upon mutual agreement by both parties (extended term). Unless earlier terminated in accordance with Sections 8.11 or 8.12 of this Agreement, this Agreement shall continue in full force and effect until completion of the services, except as otherwise provided in the Schedule of Performance.
SECTION FOUR: COORDINATION OF WORK
4.1 Representative of Consultant. Chris Rideout, Principal in Charge is hereby designated as the principal representative of the Consultant, authorized to act in its behalf with respect to the work and services specified herein and to make all decisions in connection therewith. A substitution of the designated representative must be approved in advance by the City.
4.2 Contract Officer. The Contract Officer shall be Rick Yee, Deputy Director of Public Works/Assistant City Engineer or such other person as may be designated by the City Manager of City. It shall be Consultant's responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and Consultant shall refer any decisions, which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer.
SECTION FIVE: INSURANCE AND INDEMNIFICATION
5.1 Without limiting Consultant's indemnification obligations, Consultant shall not undertake the services contemplated hereunder until Consultant has obtained all of the insurance required herein from a company or companies acceptable to City, and Consultant shall maintain
2284/009410-1001
10434958.1 a05/25/22 -4-
all such insurance in full force and effect at all times during the term of this License and any extension or renewal thereof. Insurance shall be placed with insurers having a current A.M. Best rating of no less than A-: VII or equivalent or as otherwise approved by City.
5.2 Consultant shall take out and maintain the following insurance:
5.2.1. Workers' Compensation and Employer's Liability Insurance: Consultant shall cover or insure as required by applicable laws relating to workers’ compensation insurance all of its employees performing the services contemplated hereunder, in accordance with the “Workers' Compensation and Insurance Act,” Division IV of the Labor Code of the State of California and any Acts amendatory thereof. Consultant shall provide worker's compensation insurance and employer's liability insurance with limits not less than One Million Dollars ($1,000,000) each occurrence, One Million Dollars ($1,000,000) disease policy limit, and One Million Dollars ($1,000,000) disease each employee. Such policy of workers compensation insurance shall contain the following separate endorsements:
(a) “Insurer waives all rights of subrogation against the City of Yorba Linda, its officers, directors, employees, representatives and volunteers.” (b) “This insurance policy shall not be suspended, voided, reduced in coverage or in limits, cancelled, limited, non-renewed or materially changed for any reason by the insurer until thirty (30) days after receipt by the City of Yorba Linda of a written notice of such cancellation, limitation or reduction of coverage.”
5.2.2. Commercial General Liability Insurance providing coverage in the following minimum limits:
(a) Combined single limit of One Million Dollars ($1,000,000) per occurrence for Bodily Injury, Personal Injury or Death and Property. (b) Damage Coverage shall be at least as broad as Insurance Services Office (ISO) Commercial General Liability coverage (occurrence Form CG 0001). (c) If Commercial General Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to the project/location (with the ISO CG 2503 or ISO CG 2504, or insurer's equivalent endorsement provided to City), or the general aggregate limit shall be twice the required occurrence limit.
5.2.3. Comprehensive Automobile Liability Insurance, including owned, nonowned, leased, hired, and borrowed automobiles and similar vehicles, providing the following minimum limits:
(a) Combined single limit of One Million Dollars ($1,000,000) per occurrence for Bodily Injury or Death and Property Damage. (b) Coverage shall be at least as broad as Insurance Services Office (ISO) Business and Auto Coverage (Form CA 0001) covering any auto.
2284/009410-1001
10434958.1 a05/25/22 -5-
5.2.4. Professional Liability: Consultant shall provide coverage appropriate to the Consultant's profession covering Consultant's wrongful acts, negligent actions, errors, or omissions. The retroactive date (if any) is to be no later than the effective date of this Agreement.
Consultant shall maintain such coverage continuously for a period of at least three years after the completion of the contract work. Consultant shall purchase a one-year extended reporting period i) if the retroactive date is advanced past the effective date of this Agreement; ii) if the policy is canceled or not renewed; or iii) if the policy is replaced by another claims-made policy with a retroactive date subsequent to the effective date of this Agreement. The limits shall be no less than $1,000,000 per claim and annual aggregate.
5.3 Endorsements: The policies of liability insurance provided for in Paragraphs
5.2.2 through 5.2.4 shall specify that this specific Agreement is insured and that coverage for injury to participants resulting from Consultant's activities is not excluded, and shall be in a form satisfactory to City and contain the following separate endorsements:
(a) “The City of Yorba Linda, its officers, directors, employees, representatives and volunteers, are declared to be additional insureds on all of the above policies with respects to the operations and activities of the named insured at or from the premises of the City of Yorba Linda. The coverage shall contain no special limitations on the scope of protection afforded to the City of Yorba Linda, its officers, directors, employees, representatives and volunteers.”
(b) “This insurance policy shall not be suspended, voided, reduced in coverage or in limits, canceled, limited, non-renewed, or materially changed for any reason until thirty (30) days after receipt by the City of Yorba Linda of a written notice of such cancellation, limitation or reduction of coverage.” (c) “This insurance policy is primary insurance and no insurance held or owned by the designated additional insureds shall be called upon or looked to cover a loss under said policy; the City of Yorba Linda shall not be liable for the payment of premiums or assessments on this policy.”
(d) “Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City of Yorba Linda, its officers, directors, employees, representatives, or volunteers.” (e) “This insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.”
5.4 Evidence of Coverage: Consultant shall at the time of the execution of the Agreement present to City the original policies of insurance required by this Section 5 or a certificate of the insurance, with separate endorsements (Insurance Services Office Form CG 2026, or equivalent), showing the issuance of such insurance and the additional insured and other provisions and endorsements required herein, and copies of all endorsements signed by the insurer's representative. All policies shall contain the Consultant's name and location of the Premises on the certificate. At least thirty (30) days prior to the expiration of any such policy, a
2284/009410-1001
10434958.1 a05/25/22 -6-
signed complete certificate of insurance, with all endorsements provided herein, showing that such insurance coverage has been renewed or extended, shall be filed with City. Consultant's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
5.5 Review of Coverage: City shall have the right at any time to review the coverage, form, and limits of insurance required under this Agreement. If, in the sole and absolute discretion of City, the insurance provisions in this Agreement do not provide adequate protection for City, City shall have the right to require Consultant to obtain insurance sufficient in coverage, form and limits to provide adequate protection and Consultant shall promptly comply with any such requirement. City's requirements shall not be unreasonable but shall be adequate in the sole opinion of City to protect against the kind and extent of risks which may exist at the time a change of insurance is required, or thereafter.
5.6 Deductibles: Any and all deductibles must be declared and approved by City prior to execution of this Agreement.
5.7 Agreement Contingent Upon Coverage: Notwithstanding any other provision of this Agreement, this Agreement shall be null and void at all times when the above-referenced original policies of insurance or Certificate of Insurance or Renewal Certificates or Endorsements are not on file with City.
5.8 Workers' Compensation Insurance. By his/her signature hereunder, Consultant certifies that he/she is aware of the provisions of Section 3700 of the California Labor Code which requires every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and he/she will comply with such provisions before commencing the performance of the work of this Agreement. To the extent required by law, Consultants and subcontractors will keep Workers' Compensation Insurance for their employees in effect during all work covered by this Agreement. In the event Consultant has no employees requiring Consultant to provide Workers' Compensation Insurance, Consultant shall so certify to the City in writing prior to the City's execution of this Agreement.
The City shall not be responsible for any claims in law or equity occasioned by failure of the Consultant to comply with this section or with the provisions of law relating to Worker's Compensation.
5.9 Indemnification. Consultant shall indemnify, defend, and hold City and City's agents, officers, and employees (“City Personnel”) harmless from and against any and all actions, suits, claims, demands, judgments, attorney's fees, costs, damages to persons or property, losses, penalties, obligations, expenses or liabilities (herein "claims" or "liabilities") that may be asserted or claimed by any person or entity arising out of the negligence, recklessness, or willful misconduct of Consultant, its employees, agents, representatives or subcontractors in the performance of any tasks or services for or on behalf of City, whether or not there is concurrent active or passive negligence on the part of City and/or City Personnel, but excluding such claims or liabilities arising from the sole active negligence or willful misconduct of City or City Personnel. In connection therewith:
2284/009410-1001
10434958.1 a05/25/22 -7-
5.9.1. Consultant shall defend any action or actions filed in connection with any such claims or liabilities, and shall pay all costs and expenses, including attorney's fees incurred in connection therewith, to the maximum extent allowed under California law including but not limited to Civil Code section 2782.8.
5.9.2. Consultant shall promptly pay any judgment rendered against City or any City Personnel for any such claims or liabilities, to the maximum extent allowed under California law including but not limited to Civil Code section 2782.8..
5.9.3. In the event City and/or any City Personnel is made a party to any action or proceeding filed or prosecuted for any such damages or other claims arising out of or in connection with the negligence, recklessness, or willful misconduct of Consultant, Consultant shall pay to City any and all costs and expenses incurred by City or City Personnel in such action or proceeding, together with reasonable attorney's fees and expert witness fees, to the maximum extent allowed under California law including but not limited to Civil Code section 2782.8..
SECTION SIX: RECORDS, REPORTS, AND INTELLECTUAL PROPERTY.
6.1 Reports. Consultant shall periodically prepare and submit to the Contract Officer such reports concerning Consultant's performance of the services required by this Agreement as the Contract Officer shall require.
6.2 Records. Consultant shall keep such books and records as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the cost and the performance of such services. Books and records pertaining to costs shall be kept and prepared in accordance with generally accepted accounting principles. The Contract Officer shall have full and free access to such books and records at all reasonable times, including the right to inspect, copy, audit, and make records and transcripts from such records.
6.3 Ownership of Documents and Data. All original drawings, specifications, reports, records, data, documents and other materials, whether in hard copy or electronic form, which are prepared by Consultant, its employees, subcontractors and agents in the performance of this Agreement, shall be the property of City and shall be delivered to City upon termination of this Agreement or upon the earlier request of the Contract Officer, and Consultant shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Consultant shall cause all subcontractors to assign to City any documents or materials prepared by them, and in the event Consultant fails to secure such assignment, Consultant shall indemnify City for all damages suffered thereby.
6.4 In the event City or any person, firm or corporation authorized by City reuses said documents and materials without written verification or adaptation by Consultant for the specific purpose intended and causes to be made or makes any changes or alterations in said documents and materials, City hereby releases, discharges, and exonerates Consultant from liability resulting from said change. The provisions of this clause shall survive the completion of this Contract and shall thereafter remain in full force and effect.
6.5 Intellectual Property and Proprietary Information.