Sub-watershed BMP
Tributary Area
(Select Yes or No. If yes,
provide description.)
Yes No

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 15
Section IV Best Management Practices (BMPs)
IV.1 Project Performance Criteria
This section describes the details of the BMP selected for the project and the performance criteria used to demonstrate treatment requirements are satisfactory and in compliance with County of Orange technical guidance.

Project Performance Criteria
List applicable Low
Impact
Development (LID)
performance
criteria. (Additional
Details in Section

7.II-2.4.3 of the
Model WQMP)
Priority Projects must infiltrate, harvest and use, evapotranspire, or biotreat, the 85th percentile, 24-hour storm event [Design Capture Volume (DCV)]. Infiltration, harvest and use, and/or
evapotranspiration must be utilized to the extent feasible before considering biotreatment.

LID requirements may be met within the project footprint as described in Section IV.3.2 below and/or at a sub-watershed scale (Section IV.3.3 below).

List applicable
treatment control
BMP performance
criteria. (Additional
Details in Section

7.II-3.2.2 from
Model WQMP)
LID performance criteria have been met through retention of the DCV within the project footprint and/or at a sub-watershed scale.

Treatment control requirements are fully met.

LID performance criteria have been met through biotreatment of the remaining DCV not feasibly retained; biotreatment BMPs have been selected to have a medium to high effectiveness for treating the primary POCs.

LID performance criteria are not fully met by retention or biotreatment; treatment control requirements are met by selecting treatment control BMP to have a medium to high effectiveness for treating the primary POCs and sizing treatment control BMPs for the remaining portion of the DCV.

It is not feasible to provide LID or treatment control BMPs for the entire DCV. An alternative compliance plan is prepared utilizing credits from the BMP Exchange.

Calculate LID DCV
for Project.
(See Master WQMP
Section 3.7)
DCV = C x d x A
DCV in cubic feet
C = runoff coefficient
d = design capture depth (in)
A = total tributary area (sq ft)

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 16
IV.2. Site Design, Drainage Management Areas, and LID BMPs The section below includes a narrative of the details on the site design and drainage management areas for the project. See Master WQMP Section 3.4 for details.

Site Design BMPs
The following table provides a list of Site Design BMPs that may be applicable for Priority Projects. Please identify each Site Design BMP included for the project, and briefly describe within the table. See Master WQMP Section 3.4.

Name Check If
Included Brief Description
Retention Grading
Downspout Dispersion
Downspout Infiltration
Amended Soils Over Tight
Underlying Soils
Street Trees, Canopy
Interception
Use of drought tolerant
trees/shrubs
Minimize Use of
Impervious Surfaces in
Landscape Design

Walkways Constructed
with Permeable Surfaces
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 17
Table for Summarizing DMAs and BMPs
General summary of all project DMAs and proposed BMPs. Details are provided in the next sections. See Master WQMP Section 3.6 for details.

DMA ID Land
Cover
Area,
ac
%
Imp
DCV
Required,
cu-ft
Narrative of Site Design
Approach
LID
Compliance
Approach1

1 Per the Resort Master WQMP, LID compliance approaches may include project-based LID BMPs (list the type), a sub-watershed LID BMP, and/or participation in the BMP Exchange, if eligible.

IV.3 LID BMP Selection and Project Conformance Analysis The infiltration feasibility category (Categories 1 through 3; Master WQMP Section 3.6.2) for each project DMA is described in this section along with the infiltration feasibility category that applies to each project DMA. An explanation or supporting information (e.g., Geotechnical Report) are provided, if applicable, including completed worksheets (Master WQMP Appendix 3-B) in Attachment A.

IV.3.1 Infiltration Feasibility Category
Table for Summarizing Infiltration Category
DMA ID Infiltration Feasibility
Category Explanation and Supporting Information

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 18
IV.3.2 Infiltration BMPs (Full, Biotreatment with Infiltration, Harvest or Biotreatment)
The proposed project has identified the following BMPs (see Master WQMP Section 3.6.4) to meet the requirements:

IV.3.2.1 Full Infiltration BMPs (Category 1 Feasibility Conditions) This category is not applicable to this project.

This category applies to this project.

The following table identifies the infiltration BMPs to be used in project that fulfill the DCV requirements in full and as part of the proposed project footprint.

Name Included?
Bioretention without underdrains (possible)
Rain gardens
Porous landscaping
Infiltration planters
Retention swales
Infiltration trenches
Infiltration basins
Drywells
Subsurface infiltration galleries
French drains
Permeable asphalt
Permeable concrete
Permeable concrete pavers
Other:

Other:

Select sizing method used to derive the calculations in the following table:

Resort Sizing Factor Method for Infiltration BMPs (Master WQMP Section 3.7.4) (preferred)
Simple DCV method (TGD Section III.3.1)
Capture efficiency method for volume-based BMPs (TGD Section III.3.2) Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 19
Table to Summarize Sizing of Infiltration BMPs
DMA ID Area, ac % Imp
DCV
Required,
cu-ft

LID BMP
DCV
Provided,
cu-ft
Sizing Method;
Location of
Worksheet/
Calculations

IV.3.2.2 Biotreatment with Infiltration BMPs (Category 2 Feasibility Conditions) This category is not applicable to this project.

This category applies to this project.

The following table identifies the biotreatment with infiltration BMPs to be used in project Name Included?
Bioretention with elevated underdrains
Biofiltration Planter with elevated underdrains
Other:

Other:

Select sizing method used to derive the calculations in the following table:

Resort Sizing Factor Method for Biotreatment with (Partial) Infiltration BMP (Master WQMP Section 3.7.4) (preferred)
Simple DCV method (TGD Section III.3.1)
Capture efficiency method for volume-based BMPs (TGD Section III.3.2) Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 20
Summary Table Utilizing Resort Biotreatment with Infiltration Sizing Factor DMA ID Area, ac % Imp
BMP
Surface
Area
Required,
sq-ft1

LID BMP
BMP
Surface
Area
Provided,
sq-ft1
Sizing Method;
Location of
Worksheet/
Calculations

1 Size expressed in surface area at mid ponding depth when using Resort Sizing Factor method. BMP profile (i.e., ponding depth, media depth, stone depth) must also be reported. Size expressed in volume (cu-ft) when using DCV or capture efficiency method.

IV.3.2.3 Rainwater Harvesting BMPs (Category 3 Feasibility Conditions) This category is not applicable to this project.

This category applies to this project.

Rainwater harvesting BMPs were considered for this project as follows:

Not Applicable
IV.3.2.4 Biotreatment BMPs (Category 3 Feasibility Conditions) This category is not applicable to this project.

This category applies to this project.

The following biotreatment BMPs were identified and selected for the project’s DMAs where infiltration and harvest and use are not feasible.

Name Included?
Bioretention with underdrains
Stormwater planter boxes with underdrains
Rain gardens with underdrains
Proprietary vegetated biotreatment systems
Other:

Other:

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 21
Select sizing method used to derive the calculations in the following table:

Resort Sizing Factor Method for Biotreatment with (Partial) Infiltration BMP (Master WQMP Section 3.7.4) (preferred) (set infiltration rate to zero when using this method for biotreatment only BMPs)
Simple DCV method (TGD Section III.3.1)
Capture efficiency method for volume-based BMPs (TGD Section III.3.2) Capture efficiency method for flow-based BMPs (TGD Section III.3.3) Summary Table for Biotreatment BMPs
DMA ID Area, ac % Imp
BMP
Surface
Area
Required,
sq-ft1

LID BMP
BMP
Surface
Area
Provided,
sq-ft1
Sizing Method;
Location of
Worksheet/
Calculations

1 Size expressed in surface area at mid ponding depth when using Resort Sizing Factor method. BMP profile (i.e., ponding depth, media depth, stone depth) must also be reported. Size expressed in volume (cu-ft) when using DCV or capture efficiency method. Size expressed in flowrate (cfs) when using flowbased sizing methods.

IV.3.3 Sub-Watershed LID BMPs
The following section summarizes the sub-watershed LID BMPs applicable to the compliance approach for stormwater runoff treatment for the project.

Sub-Watershed BMP Description
Not Applicable
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 22
Sub-watershed BMP Acceptance Criteria
[Answer all with Yes, No, or N/A (Not Applicable)].

Acceptance Question
Response
(Yes, No
or NA)
Guidance

1. Is this a stand-alone sub-watershed
BMP, being developed for future
constrained projects?
Yes
No
N/A
If Yes, include a sub-watershed BMP
Exhibit/Site Plan; skip to item No. 5

2. Will the sub-watershed BMP be
constructed prior to occupancy of
the development project it is
associated with?
Yes
No
N/A
If this is a stand-alone sub-watershed
BMP project, then this question is not
applicable.

3. Is the sub-watershed BMP
downstream of the project footprint,
such that runoff from the project
would be diverted to the subwatershed BMP?
Yes
No
N/A
Show the location of both project and
sub-watershed BMP on the BMP
Exhibit/Site Plan.

If this is a stand-alone sub-watershed
BMP project, then this question is not
applicable.

4. Is there adequate capacity remaining
in the sub-watershed BMP to
accommodate project runoff?
Yes
No
N/A
Show tabulations in the table below.

Section IV.4 must also be completed

5. Is it feasible to infiltrate in the
location of the sub-watershed BMP,
as demonstrated via site specific
geotechnical investigation?
Yes
No
N/A
If yes, include copy of geotechnical
investigation in Attachment E.

If no, provide explanation and technical
justification in the Sub-Watershed BMP
Description below.

6. Is an operations and maintenance
plan, with funding and
responsibility, defined in this
WQMP or in the previous WQMP
that created the sub-watershed
BMP?
Yes
No
N/A
Explain:

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 23
The sub-watershed BMP included in this WQMP meets the following criteria:

Option 1. A new Sub-Watershed BMP is part of this project. Details are provided in Option 1 and in the table below.

Option 2. A pre-existing Sub-Watershed BMP is available and operational for this project with BMP credits proposed to meet the DCV. The details are provided in Option 2 and in the table below.

The current Master WQMP Project Tracking Sheet (Master WQMP Appendix 5-A) is provided in Attachment D.

Option 1. BMP Capacity Tabulation for New Sub-watershed BMP Parameter Value Guidance
Total Tributary Area to Subwatershed BMP, ac (Asubwshed)

Tabulate total tributary area to the
diversion structure to the subwatershed BMP. Show the BMP location and tributary are on the BMP
Exhibit/Site Plan
Long Term Efficiency of Subwatershed Runoff Volume by Subwatershed BMP, (% Cap)

Provide capture efficiency worksheet
(Appendix 4-C.2)
Equivalent Developable Area, ac
(Adevelopable) Asubwshed × [%cap/80%]
Development Project Footprint Area,
ac (Aproject) Footprint of the development project
contained in this WQMP
Surplus Developable Area, ac Adevelopable - Aproject
Option 2. BMP Capacity Tabulation for Pre-existing Sub-watershed BMPs Parameter Value Guidance
Development Project Footprint Area,
ac (Aproject) Footprint of the development project
contained in this WQMP
Remaining Available Capacity in Subwatershed BMP before Project, ac (Aavailable )

Provide BMP Exchange Tracking Sheet
to demonstrate available capacity
Remaining Available Capacity in Subwatershed BMP after Project, ac Aproject – Aavailable Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 24
IV.3.4 Treatment Control BMPs
Treatment control BMPs can only be considered if the project conformance analysis indicates that it is not feasible to retain the full design capture volume with LID BMPs. Below is a description of the treatment control BMPs for this project, if applicable.

Treatment Control BMPs
BMP Name BMP Description

IV.3.5 Non-structural Source Control BMPs
The Disneyland Resort has identified the default non-structural source control BMPs in section

3.4.2 of the Master WQMP. Any deviations from the Master WQMP are noted below.

Non-Structural Source Control BMPs
Identifier Name
Check One If not applicable,
state brief reason Included Not
Applicable
N1
Education for Property
Owners, Tenants and
Occupants
Per the Resort’s Master
WQMP
N2 Activity Restrictions Per the Resort’s Master
WQMP
N3 Common Area Landscape
Management
Per the Resort’s Master
WQMP
N4 BMP Maintenance
Per the Resort’s Master
WQMP and as noted in this
project WQMP
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 25
N5
Title 22 CCR Compliance
(How development will
comply)
No hazardous waste stored
as part of this project Or
explain
N6 Local Industrial Permit
Compliance Not an industrial use
N7 Spill Contingency Plan
No hazardous waste stored
as part of this project Or
explain
N8 Underground Storage
Tank Compliance
No underground storage
tanks on project site Or
explain
N9 Hazardous Materials
Disclosure Compliance
No hazardous materials
used/ stored as part of this
project Or explain
N10 Uniform Fire Code
Implementation
Per the Resort’s Master
WQMP
N11 Common Area Litter
Control
No common area litter
control Or Litter management
managed per existing
protocols described in Master
WQMP
N12 Employee Training Per the Resort’s Master
WQMP
N13 Housekeeping of Loading
Docks
No loading docks on project
site Or explain
N14 Common Area Catch
Basin Inspection
No common area catch basins
Or Per the Resort’s Master
WQMP
N15 Street Sweeping Private
Streets and Parking Lots
No private streets or parking
lots Or Per the Resort’s
Master WQMP
N16 Retail Gasoline Outlets No retail gasoline outlets on project site
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 26
IV.3.6 Structural Source Control BMPs
The Disneyland Resort has identified the default structural source control BMPs in Section 3.4.2 of the Master WQMP. Any deviations from the Master WQMP are noted below.

Structural Source Control BMPs
Identifier Name
Check One If not applicable,
state brief reason Included Not
Applicable
S1 Provide storm drain system
stenciling and signage
No storm drain inlets Or Per
the Resort’s Master WQMP
S2
Design and construct
outdoor material storage
areas to reduce pollution
introduction
No outdoor storage areas Or
Per the Resort’s Master
WQMP
S3
Design and construct trash
and waste storage areas to
reduce pollution
introduction
No trash and waste storage
areas included in this project
Or Per the Resort’s Master
WQMP
S4
Use efficient irrigation
systems & landscape
design, water conservation,
smart controllers, and
source control
No landscape irrigation Or
Per the Resort’s Master
WQMP
S6 Dock areas No dock areas in this project
S7 Maintenance bays No maintenance bays in this
project
S8 Vehicle wash areas No vehicle wash areas in this
project
S9 Outdoor processing areas No outdoor processing areas in this project Or explain
S10 Equipment wash areas No equipment wash areas in
this project
S11 Fueling areas No fueling areas in this
project
S13 Wash water control for food
preparation areas
No food preparation areas in
this project
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 27
IV.4 BMP Exchange
This section outlines the project’s participation in the Resort’s BMP Exchange, if applicable, per Master WQMP Section 5.2 and by using the worksheet in Master WQMP Appendix 5-B.

IV.4.1 Eligibility to Participate in BMP Exchange
Eligibility to participate in alternative compliance and use the BMP Exchange is documented per Section 5.2 of the Master WQMP and described below.

Not Applicable
IV.4.2 Credit Utilization Documentation
Documentation supporting a BMP Exchange credit request to be utilized for the project per section 5.2 of the Master WQMP is described below.

Not Applicable
IV.4.3 Credit Generation Documentation
Documentation supporting a BMP Exchange credit being generated by the project per section

5.3 of the Master WQMP is described below.

Not Applicable
IV.4.4 Summary of BMP Exchange Activity
The BMP Exchange activities associated with this project are summarized in the table below.

Upon receipt of Final Project WQMP approval by the City of Anaheim, the entries listed below are shown in the latest version of the Resort’s Master WQMP Project Tracking Sheet1 (See Attachment D).

1 The Master WQMP Project Tracking Sheet is updated with the Summary of BMP Exchange Activity information provided below and in the worksheet in Appendix 5-B. Environmental Affairs will provide the updated Master WQMP Project Tracking Sheet upon review of the Preliminary Project WQMP, prior to submittal to the City of Anaheim.

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section IV
Enter Month 201X Page 28
Summary of BMP Exchange Activity
Starting Balance
Credit type (enter in the appropriate column)  Roads/Parking Other BMP Exchange Balance Prior to Project (sq-ft)
Credit Generation
Is the project adding to the BMP Exchange? Yes No
If Yes:

Credit type (enter in the appropriate column)  Roads/Parking Other Project-based BMP Credit Generated (sq-ft)
Sub-Watershed BMP Credit Generated (sq-ft)
New BMP Exchange Balance (sq-ft)
Attach Worksheet in Master WQMP Appendix 5-B to show exchange calculations.

Credit Utilization
Is the project utilizing credits from the BMP Exchange? Yes No Is the project eligible to utilize the BMP Exchange?
Yes, credits are being subtracted from a sub-watershed BMP for a tributary project Yes, as part of alternative compliance. See Section IV.4.2.

Credit type (enter in the appropriate column)  Roads/Parking Other BMP Exchange Credits Utilized (sq-ft)
Ending Balance
Has BMP Exchange sheet been modified to reflect changes? Yes No Credit type (enter in the appropriate column)  Roads/Parking Other BMP Exchange Balance After Project (sq-ft)
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section V
Enter Month 201X Page 29
Section V Inspection/Maintenance
Responsibility for BMPs
The table below summarized the inspection, operation, and maintenance responsibilities for this project’s BMPs. The Operation and Maintenance Plan specific to the selected BMPs for this project is provided in Attachment B.

BMP Inspection/Maintenance
BMP Responsible
Party(s)
Inspection/ Maintenance
Activities Required
Minimum
Frequency of
Activities
N1, Education for
Property Owners,
Tenants and
Occupants
Director,
Environmental
Affairs and
Conservation
Owner, tenants, and
contracted personnel are
provided training using
specified materials.

Educational
Materials updated
as needed
N3, Common Area
Landscape
Management
Director,
Horticulture and
Resort
Enhancement
Verify that the irrigation
system is working properly;
Check for broken sprinkler
heads and verify proper
coverage.  Adjust valve run
times to avoid over‐watering
and/or ponding in landscape
areas.

Ongoing; system to
be repaired or
replaced as
necessary
N4, BMP
Maintenance
Director,
Engineering
Services
Verify BMP is operating as
intended; verify that no
damage has occurred after
storm events.

Inspected and/or
cleaned quarterly,
and as needed
N9, Hazardous
Materials
Disclosure
Compliance
General Manager,
Security &
Emergency
Services
Comply with County/City
ordinances on
Hazardous Materials
Disclosure.

Ongoing
N10, Uniform Fire
Code
Implementation
General Manager,
Security &
Emergency
Services
Comply with Article 80 of the
Uniform Fire
Code.

Ongoing
N11, Common
Area Litter
Control
General Manager,
Park Operations
and Guest
Services
Pick up debris and trash to
maintain a clean site. Sweep
out trash storage area(s) and
pick up loose debris and
trash.

Daily litter removal
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section V
Enter Month 201X Page 30
N12, Employee
Training
Director,
Environmental
Affairs and
Conservation
Employees responsible for
the implementation of this
WQMP shall be familiar with
this document and shall be
provided with classes,
seminars, etc. to satisfy on‐
going BMP training.

Training within
one month of start
date, annually
thereafter (prior to
October 1st)
N14, Common
Area
Catch Basin
Inspection
Director,
Engineering
Services
Inspect drain inlets and catch
basins.

Ensure that area drains in
landscaped areas are clear of
debris and sediment.

Rainy Season:

Once prior to
October 1st and
monthly or as
needed thereafter
Dry Season:

As needed
N15, Street
Sweeping Private
Streets and
Parking Lots
General Manager,
Park Operations
and Guest
Services
Sweep parking lot using
street sweepers.  Twice per week.

S1, Provide storm
drain stencilling
and signage
Director,
Engineering
Services
Verify legibility of prohibitive
language markers and signs
at storm drain inlets and
catch basins and replace as
needed.

Annually, replace
as needed
S4, Use efficient
irrigation systems
& landscape
design, water
conservation,
smart controllers,
and source control
Director,
Horticulture and
Resort
Enhancement
Implement application
methods of irrigation water to
minimize runoff of excess
irrigation water into the
storm water conveyance
system, correct as necessary.

Monthly, correct as
needed

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section VI
Enter Month 201X Page 31
Section VI BMP Exhibit (Site Plan)
VI.1 BMP Exhibit (Site Plan)
The project’s BMP exhibit is included in Attachment C as required in the Orange County Model WQMP.

VI.2 Submittal and Recordation of Water Quality Management Plan
Each approved and Final Project WQMP (including BMP Exhibit, Operations and Maintenance (O&M) Plan, and Appendices) shall be submitted as required by the City of Anaheim and recorded in the Orange County Clerk-Recorder’s Office, prior to close-out of grading and/or building permit.

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Section VII
Enter Month 201X Page 32
Section VII Educational Materials
Please refer to the pre-established education and employee training material included in Appendix 3-F of the Master WQMP, dated December 2014 incorporated here by reference.

Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Attachment
Enter Month 201X
Attachment A
Infiltration BMP Feasibility Worksheet
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Attachment
Enter Month 201X
Attachment B
Operation and Maintenance Plan
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Attachment
Enter Month 201X
Attachment C
BMP Exhibit (Site Plan)
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Attachment
Enter Month 201X
Attachment D
Master WQMP Project Tracking Sheet
Preliminary or Final? Water Quality Management Plan (WQMP) Project Name
DISNEYLAND RESORT Attachment
Enter Month 201X
Attachment E
Supporting Worksheets and Documents

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 1
User’s Guide
for
Disneyland Resort Priority Project
WQMP Template
Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 2
User’s Guide
This Project WQMP template provides the structure and outline required for all WQMPs prepared for Disneyland Resort projects. This section contains additional information, instructions, guidance, and entry examples, to aid the preparer in completing the Project WQMP. This document is only to be used as a guide.

Using or editing older versions of a WQMP may lead to approval delays by the City of Anaheim. Other templates from other cities or sources are not acceptable for Disneyland Resort projects.

The Project WQMP template itself does not include instructions or guidance to facilitate completion of the document. Only limited instruction is provided within this user’s guide.

The Project WQMP template references related and important technical guidance that stipulates regulatory requirements which should be consulted as needed. All technical documents, forms and templates used to prepare a project or sub-watershed BMP WQMP document are found on The Hub. Technical guidance includes:

1. The 2014 Resort Master WQMP (OTH2014-00732) approved by the City of Anaheim

2. The Orange County Technical Guidance Document (TGD) and Appendices (DAMP Exhibit 7.III)

3. The County of Orange Model WQMP (DAMP, Exhibit 7.II, May 19, 2011)

4. The Orange County Municipal Storm Water Permit NPDES Permit No. CAS618030 Using the Template
This Project WQMP template is structured as a “fillable form” with fields formatted for easy entry of data and information. The ability to change the formatting in the WQMP template is restricted and information and data may only be entered in the form fields.

Some fields will automatically populate themselves from information provided in the first fillable area for that specific entry (e.g. Project Name). NOTE: these fields may not show as populated until the “print” or “print preview” function for the document has been used.

Depending on the version of Word being used, go to “Print” or “Print Preview,” and then “Close Print Preview” or return “Home”. Automatically or self-populated fields should now be updated and visible.

Fields in this template are generally of three types as shown below:

Text entry fields appear as gray areas and are provided where specific entries are required or for text that has an “or” option and requires a selection between two choices. Default text appears in most of these fields to indicate what type of information is being requested in the field.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 3
Self-populating fields will appear as normal text. These fields take information entered in corresponding “text entry fields” and populate an area where repeat information is requested.

Examples include the project name and engineer information, which are first requested on the cover page and will automatically populate the document’s header and Engineer’s Certification page, respectively. See the note on the previous page for help with viewing these fields after they are updated.

Check boxes to indicate a choice, such as Yes No, are provided and can be checked or unchecked by clicking on the box.

NOTE: The template’s Table of Contents (TOC) is also a self-populating field. An error in the Microsoft Word program may cause the TOC to reflect that all sections in the document are on the same page. In order for this field to reflect accurate page numbers, scroll to the final page in the template, put the cursor in the text entry field on the last page, then depending on the version of Word in use, go to “Print” or “Print Preview,” and then “Close Print Preview” or return “Home.” Users of Word 2013 may need to select “print current page only” and print the final page in order for the TOC to refresh. Saving the document may also force an accurate reflection of the page numbers for users of Word 2013.

It is recommended that prepare seek assistance or support from a word processing expert if difficulty is encountered with this form.

Using this User’s Guide
This User’s Guide goes section-by-section through the Project WQMP template and provides instructions and sample text to assist the preparer in its completion.

Additional instructions are shown as italicized text
Sample text for text entry fields is shown in yellow highlighted text and provides the preparer with suggestions for the wording of entries. However, this text must be edited and customized for the project. Examples include the description of the project’s category “Significant redevelopment with replacement of greater than 5,000 square feet.”

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 4
Transmittal Page (First Page) of Document
(Stakeholder’s Scope Approval/Distribution)
This page is for internal use only. Preparer does not need to enter data on this page. Project information will self-populate from the WQMP cover page.

WQMP Cover Page
Enter requested data into the text entry fields. This should cause the headers and footers of the document to automatically populate the project name and date.

Project Owner’s Certification
Enter requested data into text entry fields.

Engineer’s Certification
Enter requested data into the text entry fields. Preparer Signature and Engineer’s Stamp may be inserted as jpg files (digital photo).

Summary of WQMP Elements
The same standard WQMP template is intended to be used in a number of project types, including the WQMP for priority development, the WQMP for the design of sub-watershed BMPs, and to generate and utilize BMP Exchange credits. For different scenarios, certain sections will be completed and certain sections will not apply.

Preparer: Indicate Yes or No in the table to all project elements that apply.

Contents
This section should automatically update when the document is saved with any page number changes that apply. See the note under “Using this Template” above if it does not update correctly.

Attachments. Ensure that all required attachments are included with the Project WQMP submittal.

For Attachment E: Add additional attachments, including Master WQMP worksheets or checklists, as needed to provide supporting documentation (e.g., geotechnical investigation report).

Section I Permit(s) and Water Quality Conditions of Approval or Issuance Provide discretionary/planning application or grading/building permit information and water quality conditions of approval, or permit issuance, applied to the project. Edit table as needed to include detailed information that applies to the selection of BMPs or other related conditions of approval. If conditions are unknown, please request applicable conditions from appropriate Cast Member(s). Refer to TGD Section 2.1.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 5
Preliminary Project WQMP
Was a Preliminary Project Water
Quality Management Plan
previously approved for this
project?
Check
Yes No
If yes, Date: and Preliminary WQMP
No.:

Section II Project Description
II.1 Project Description
Provide a detailed project description including:
 Project areas;
 Land uses;
 Land cover – pervious and impervious for both pre-project and post-project conditions;  Design elements;
 A general description not broken down by drainage management areas (DMAs).

Preparer: Include attributes relevant to determining applicable or unique source control BMPs. Describe project as it relates to the classifications listed in Table II.1 in the Project WQMP template.

Refer to Master WQMP Section 3.2 or TGD Section 2.2 for information that must be included in the project description.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 6
Description of Proposed Project
Development Category
(From Master WQMP
Section 3.2):

Enter the category using the text box. Refer to Table II.1 for appropriate categories.

EXAMPLE: Significant redevelopment with replacement of greater than 5,000 square feet.

Project Area (sq ft):
_______
Number of Dwelling Units: 0
NOTE: Usually zero (0) for Resort projects
SIC Code:

Drainage Patterns/
Connections

EXAMPLE TEXT
The site generally flows from the northwest to the southeast through a combination of downspouts, curb and gutter, vegetated BMPs, storm drain inlets, and storm drain pipes. Runoff from the entire project concentrates at a connection to the existing storm drain in the SE corner of the site (See Section VI - BMP Exhibit and Site Plan).

Narrative Project
Description:
(Use as much space as
necessary.)

EXAMPLE TEXT
The project is a design build phased project which includes expansion of DCA BOH on already developed, mostly paved areas, so there will be very minimal increase of impervious foot prints. Project is divided into several small scope items, each scope would be developed at different time based on schedule. Subject WQMP includes 4 scope items only and considers all 4 scope items as a single project.

Following is the list of scope items:
 Custodial DCA Multipurpose Building
 Central Maintenance Facility East
 DCA Entertainment Complex
 DCA Production Kitchen – Flex Office
The total area of the project is 2.0 acres or 87,120 square feet, of which includes the buildings/structure, parking areas and landscaped area.

There are no retail stores and sit down eating places associated with the proposed redevelopment.

Custodial DCA Multipurpose Building
The Custodial DCA Multipurpose Building is a 2-story building to the existing Monsters Inc attraction building, north of the Monorail, in the northeast area of the DCA BOH. This office is a multi-functional space, intended to be the home base operational area for the Custodial Operations at Disney's California Adventure & Down town Disney. It will also be the central check in area for over 500 Custodial Hourly Cast Members and will be used 24/7.

Exterior Access and Parking Area includes (7) Electric cart parking spaces with (120v AC 20 amp) charging outlets……..

II.2 Potential Stormwater Pollutants
Determine and list expected stormwater pollutants based on land uses and site activities.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 7
Preparer: Refer to Table II.2 in WQMP template for expected pollutants based on land uses specific to the Resort. Additional information may also be found in Master WQMP Section 3.6.3 and Tables 3-6, 3-7 and 3-8.

II.3 Hydrologic Conditions of Concern
There are not hydrologic conditions of concern downstream of the Resort since the discharge is to an engineered, concrete channel.

Preparer. The No is to remain checked. Do not delete the map showing the Resort’s location relative to the watershed and drainage channels.

The Yes box will never be checked for a Resort WQMP.

II.4 Post Development Drainage Characteristics
Describe post development drainage characteristics in the gray text box provided. Refer to Section 2.2.4 in the TGD for details.

NOTE: IF A SUB-WATERSHED BMP IS PROPOSED, PROVIDE A GENERAL OVERVIEW AND

DESCRIBE THE GENERAL DRAINAGE PATTERNS FROM THE PROJECT FOOTPRINT TO THE SUB-WATERSHED BMP. More details are provided later. See Master WQMP Sections 3.5 and Section 4, if applicable.

EXAMPLE TEXT
Roof runoff from building 2 and 4 is collected in the roof downspouts and discharged into a biofiltration planter box located on the east side of the building. Runoff from storage area for building-2 also drains into the planter box. Half of the roof of building 6 also drains in to the planter box. Out of 1.8-ac of disturbed area about 0.78ac is treated by the proposed planter box.

Location of the planter box is shown on the BMP Plan and Site Plan for Building 2, 4 & 6 in Attachment C.

The parking/drive area of building 2, 4 and 6 which is about 0.9 acres, follows the existing drainage pattern and continues to drain to the existing catch basins located in the existing Timon Parking Lot. Porous asphalt pavement surface is provided in most of the parking stalls for building 2, 4 and 6.

Drainage leaves the project footprint in via a connection to an existing storm drain.

Water then flows through the Resort storm drain system to Outfall 2 to the City of Anaheim MS4.

Standard text provided at the bottom of the entry box
(LEAVE AS-IS. DO NOT ALTER OR DELETE):

The immediate downstream receiving water from the City of Anaheim’s MS4 is the Anaheim Barber City Channel, which connects to the Bolsa Chica Channel and drains to Sunset-Huntington Harbour through Anaheim Bay to the Pacific Ocean.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 8
II.5 Property Ownership/Management
The information is included and does not have to be changed unless the circumstances dictate a different ownership and management of the project site under development.

Refer to TGD Section 2.2.5 for more information, if needed.

Section III Site Description
III.1 Physical Setting
The information is included and does not have to be changed unless circumstances are different, except as noted below.

Refer to TGD Section 2.3.1 for more information.

Zoning
Preparer: Select appropriate Specific Plan for the project. Either use 92-2 or 92-1.

Check to ensure this is correct using Figure III.1 and III.2 included in the WQMP template. Adjust Plan Name and Location if necessary.

Predominant Soil Type
Preparer: Refer to OC Web Data Portal
http://landrecords.ocpublicworks.com/ocsl/ and/or enter site specific investigation findings
Sub-watershed BMPs
Preparer: Describe any existing sub-watershed BMPs that relate to the project and/or location of sub-watershed BMPs that are proposed to be built as part of the project.

III.2 Site Characteristics
Preparer: Complete one or both of the tables in this section; as applicable. Additional guidance provided in example below.

NOTE: the first table applies to the development project and the second table applies to the sub-watershed BMP, only if applicable. For additional information on sub-watershed BMPs for projects with constraints see the Resort’s Master WQMP, Section 4. Delete the second table if a sub-watershed BMP is not applicable to this WQMP. Refer to Section 2.3.2 in the TGD, if needed.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 9
Site Characteristics of Development Project Footprint
Precipitation Zone
(85th percentile, 24-hour
storm depth)

0.85 inches
Topography
Preparer: describe general topographic features of the site. Refer to Section VI also. Note that a BMP Exhibit and Site Plan need to be included in Attachment C.

Drainage
Patterns/Connections
Preparer: Provide brief summary of drainage patterns and connections from Section II above. Describe the drainage basin delineations. Provide corresponding Site Plan as Attachment C (per Section VI instructions) Soil Type, Geology, and
Infiltration Properties
Soil Type ___
Preparer: Enter the soil type and briefly summarize findings of geotechnical investigations of the project site as they relate to the geologic setting and infiltration rates. Soil infiltration properties are critical information for infiltration BMPs. Refer to additional supporting information in Section IV and/or attachments.

Hydrogeologic
(Groundwater)
Conditions
Preparer: enter any site-specific information if available. If infiltration is proposed, additional and detailed information may be applicable, such as, actual depth to groundwater table.

EXAMPLE: Groundwater at the Disneyland Resort site is generally greater than 50 feet below existing grade.

Geotechnical
Conditions (relevant to
infiltration)
Preparer: Briefly summarize findings of geotechnical investigations as they relate to geotechnical risks and recommendations to avoid risks.

Refer to additional supporting information in Section IV and/or attachments.

Off-Site Drainage
Preparer: Identify tributary areas that create a storm water run-on condition to the development footprint and that are proposed to be captured/treated by the project BMP(s). Project BMPs must be sized for all tributary areas that comingle with project runoff.

Utility and
Infrastructure
Information
Preparer: Summarize utility and infrastructure information. If utilities or infrastructure create a significant constraint to the project’s direct compliance with the requirements, specify here. Refer to Section VI - BMP Plan and Site Plan for specifics.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 10
Site Characteristics of Sub-Watershed BMP Location
Precipitation Zone
(85th percentile, 24-hour
storm depth)

0.85 inches
Topography Preparer: describe general topographic features of the site. Refer to Section VI for BMP Plan and Site Plan requirements.

Drainage
Patterns/Connections
Preparer: describe how water flows to and/or through the sub-watershed BMP site; how water is diverted; describe the drainage basin delineations.

Provide corresponding Site Plan as described in Section VI.

Soil Type, Geology, and
Infiltration Properties
Soil Type ___
Preparer: Briefly summarize findings of geotechnical investigations of the sub-watershed BMP location as they relate to the geologic setting and infiltration rates. Refer to additional supporting information in Section IV and/or attachments.

Hydrogeologic
(Groundwater)
Conditions
Preparer: enter site-specific information. If an infiltration Sub-Watershed BMP is proposed, additional information may be applicable, such as, actual depth to groundwater table, infiltration rates, safety factors, etc.

Geotechnical Conditions
(relevant to infiltration)
Preparer: Briefly summarize findings of geotechnical investigations of the sub-watershed BMP location as they relate to geotechnical risks and recommendations to avoid risks. Refer to additional supporting information in Section IV and/or attachments (required worksheets) Utility and Infrastructure
Information
Preparer: Summarize utility and infrastructure information. Refer to Section VI for BMP Plan and Site Plan for specifics.

III.3 Watershed Description
Preparer: Fill out the table with relevant information. Below are the areas that need to be customized in the table. All others remain unchanged as entered in the WQMP template (e.g., Receiving Waters, 303(d) Listed Impairments). Refer to Master WQMP Section 3.6.3 for additional information or TGD Section 2.3.3.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 11
Primary Pollutants of
Concern for the Project
Preparer: Check the boxes for the pollutants that apply. A “primary pollutant of concern” is a pollutant that is expected to be generated from the project (See Section II.2) and is currently causing or contributing to an impairment in receiving waters. Refer to Master WQMP Section

3.6.3 and TGD Section 2.3.3
Other Pollutants of
Concern for the Project
Preparer: Check the boxes for the pollutants that apply. “Other pollutant of concern” is a pollutant that is expected to be generated from the project (See Section II.2) but is not currently causing or contributing to an impairment in receiving waters. Refer to Master WQMP Section 3.6.3 and TGD Section 2.3.3
Sub-watershed BMP
Tributary Area
Preparer: Check Yes or No. If a sub-watershed BMP is being constructed or a previously constructed sub-watershed BMP is being utilized for compliance, describe the tributary area to the sub-watershed BMP including the location of the priority development project within this tributary area. Note, the priority development project must be located within the sub-watershed BMP tributary area in order to rely on the subwatershed BMP for primary compliance (i.e., not part of alternative compliance). See Master WQMP Section 4 for specific information.

EXAMPLE: If no sub-watershed BMP is involved, then simply NOTE:

No sub-watershed BMP considered as part of this project Section IV Best Management Practices (BMPs)
IV.1 Project Performance Criteria
Preparer: this section has been pre-populated based on Resort location and conditions. Only the entries indicated below need to be completed. Additional information on performance criteria for project-based LID BMPs is found in the Resort’s Master WQMP, Sections 3.5 through 3.7. If the project requires consideration of a sub-watershed LID BMP, additional guidance is found in the Resort’s Master WQMP in Sections 4.2 and 4.3.

Preparer: Check the applicable treatment control BMP performance criteria for the project.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 12
List applicable
treatment control
BMP performance
criteria. (Additional
Details in Section

7.II-3.2.2 from
Model WQMP)
LID performance criteria have been met through retention of the DCV within the project footprint and/or at a sub-watershed scale.

Treatment control requirements are fully met.

LID performance criteria have been met through biotreatment of the remaining DCV not feasibly retained; biotreatment BMPs have been selected to have a medium to high effectiveness for treating the primary POCs.

LID performance criteria are not fully met by retention or biotreatment; treatment control requirements are met by selecting treatment control BMP to have a medium to high effectiveness for treating the primary POCs and sizing treatment control BMPs for the remaining portion of the DCV.

It is not feasible to provide LID or treatment control BMPs for the entire DCV. An alternative compliance plan is prepared utilizing credits from the BMP Exchange.

Preparer: Provide a summary of the LID DCV calculations for the project. If multiple DMAs apply, summarize each. If detailed printouts or other spreadsheets are available, they may be referenced here and included in Attachment E.

Calculate LID DCV for Project.
(See Master WQMP Section 3.7)
CALCULATION EXAMPLE:
= (0.75 x 0.888 +0.15=0.8161) x 0.85 in x 254,826 SF x 1 ft/12 in
= 14,731 CF
IV.2. Site Design, Drainage Management Areas, and Site Design BMPs Preparer: This section requires narrative to be prepared that is project specific. The narrative should correspond to the entries in the summary tables. See Master WQMP Section 3.4 for details.

Describe site design BMPs for the project, drainage management areas (DMAs) and the corresponding chosen LID BMPs including:
 A narrative of site design practices utilized or rationale for practices not selected;  A narrative of how site is designed to allow BMPs to be incorporated to the MEP;  A table of DMA characteristics and list of LID BMPs proposed in each DMA. See Example below;
 Reference to the WQMP “BMP Exhibit” included in Section VI, as appropriate;  Calculations of Design Capture Volume (DCV) for each DMA;  A listing of GIS coordinates for LID and Treatment Control BMPs. Not needed for Preliminary Project WQMPs; but required in the Final Project WQMP.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 13
Preparer: Check the boxes for all applicable site design BMP features for the project. Include a brief description of the site design feature and location(s). Example text is shown in yellow highlight for guidance. See Master WQMP Section 3.4 for additional guidance.

Site Design BMPs
Name Check If
Included Brief Description
Retention Grading
Downspout Dispersion EXAMPLE: Splashblocks are proposed for all roof downspouts and drained to landscaping area.

Downspout Infiltration
EXAMPLE: Portion of the roof will drain to
landscaped areas or a vegetated swale as shown in
the drawings.

Amended Soils Over Tight
Underlying Soils
Street Trees, Canopy
Interception
EXAMPLE: Street trees will be placed along
walkways and street corridors as shown in the
drawings.

Use of drought tolerant
trees/shrubs
Minimize Use of Impervious
Surfaces in Landscape Design
EXAMPLE: Minimized impervious areas by not
using decorative concrete in the design and
reducing the walkways and internal roads to
minimum width possible for use.

Walkways constructed with
permeable surfaces
Table for Summarizing DMAs and BMPs
Preparer: Customize the summary table with the characteristics for each project drainage management area (DMA) and the LID BMP selected. The DCV listed must correspond to the summary in the Sectin IV.1 above. This summary table should correspond with maps and figures provided in the attachments.

This summary table includes sample entries. Add or delete rows as appropriate. See Master WQMP Section 3.6 for details.

DMA
ID
Land
Cover
Area,
ac
%
Imp
DCV
Required,
cu-ft
Narrative of Site Design
Approach
LID Compliance
Approach1
A-1 Rooftops 0.22 100 610 Provide space allocation for
bioinfiltration planter along
edge of walkway, away from
building foundation
Bioinfiltration
Planter (bioretention
with infiltration)
(See Section IV.3)
Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 14
IV.3 LID BMP Selection and Project Conformance Analysis Preparer: Determine and document the infiltration feasibility category following Section 3.6 of the Resort Master WQMP. Provide a summary of findings in Section IV.3.1 and describe BMPs in the appropriate sections that follow.

NOTE: BMP selection is governed by a specific hierarchy as shown in Master WQMP Figures 3-3 and 3-5. Selection of BMPs must be based on technical feasibility and documented in detail. Adherence to the process described in Section 3.6 is required by the City of Anaheim.

IV.3.1 Infiltration Feasibility Category
Preparer: Describe the analyses conducted to determine the infiltration feasibility category (categories 1 through 3) for each DMA. Summarize the categorization below (based on the process and criteria in Master WQMP Section 3.6) and provide references to the location of supporting information. For each DMA an infiltration feasibility worksheet (see Master WQMP Appendix 3-B) must be completed and the result of supporting investigations must be provided in Attachment A of the WQMP.

Table for Summarizing Infiltration Category
Preparer: This summary table includes sample entries. Delete and replace with actual text for the project.

Add rows as needed. Use the feasibility worksheet (Master WQMP Appendix 3-B) and provide the completed worksheet in the WQMP document as Attachment A. Include a copy of the geotechnical investigation or report in Attachment E, if applicable.

DMA ID Infiltration Feasibility Category Explanation and Supporting Information
A Category 1: Infiltration Feasible No significant constraints on infiltration exist.

B Category 2: Infiltration Partially
Feasible
Local infiltration rates are less than 0.3
inches per hour in this DMA, however
partial infiltration is acceptable from a
geotechnical perspective.

IV.3.2 Infiltration BMPs (Full, Biotreatment with Infiltration, Harvest or Biotreatment)
Preparer: For each section below, select the category or categories of BMPs proposed for the project, by checking the appropriate box(es). One or more category of BMPs may be applicable (e.g., Full Infiltration). See Master WQMP Section 3.6.4 for details.

This category is not applicable to this project.

This category applies to this project.

IV.3.2.1 Full Infiltration BMPs (Category 1 Feasibility Conditions) Preparer: Indicate by checking the box(es) the type of infiltration BMPs proposed for the project.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 15
Name Included?
Bioretention without underdrains (possible)
Rain gardens
Porous landscaping
Infiltration planters
Retention swales
Infiltration trenches
Infiltration basins
Drywells
Subsurface infiltration galleries
French drains
Permeable asphalt
Permeable concrete
Permeable concrete pavers
Other:

Other:

Preparer: Show calculations (in this section or by reference to Attachment A and appropriate worksheets) to demonstrate that the full, required LID DCV can be met with infiltration BMPs. If not using full infiltration BMP(s), then use the next sections 3.2.2 through 3.2.4, as applicable, to document how the DCV can be met with other BMPs. Document why it is not feasible to meet the full DCV with infiltration BMPs. If using full infiltration BMPs, state the sizing method use by selecting the appropriate box out of the three choices shown.

Select, by checking the box, the sizing method used to derive the calculations in the following table:

Resort Sizing Factor Method for Infiltration BMPs (Master WQMP Section 3.7.4) (preferred)
Simple DCV method (TGD Section III.3.1)
Capture efficiency method for volume-based BMPs (TGD Section III.3.2) The summary table below includes sample entries. Enter the details in the text boxes for the sizing of infiltration BMPs used for the project, if applicable. Add rows as needed. Include the infiltration feasibility worksheet (Master WQMP, Appendix 3-B) in Attachment A. Include a copy of the geotechnical investigation or report in Attachment E.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 16
Table to Summarize Sizing of Infiltration BMPs
DMA
ID
Area,
ac
%
Imp
DCV
Required,
cu-ft

LID BMP
DCV
Provided,
cu-ft
Sizing Method; Location of
Worksheet/
Calculations
A-1 0.22 100% 610 Infiltration
Trench
630 Resort Sizing Factor Method used.

See worksheet in Attachment A.

IV.3.2.2 Biotreatment with Infiltration BMPs (Category 2 Feasibility Conditions) Preparer: Infiltration of a fraction of the DCV may be accomplished using BMPs with biotreatment and infiltration. These BMPs are applicable in cases where the infiltration does not support full infiltration of the DCV, however in these cases partial infiltration may be conducted if there are no geotechnical issues.

Select, by checking the box, to note if this category of BMP is proposed for the project and proceed to completing the applicable tables. If this category of BMPs is not applicable indicate by checking the appropriate box. See Master WQMP Section 3.6.4 for details.

This category is not applicable to this project.

This category applies to this project.

Indicate in the following table the biotreatment with infiltration BMPs to be used in project. If others are considered, enter the name.

Name Included?
Bioretention with elevated underdrains
Biofiltration Planter with elevated underdrains
Other:

Other:

Select, by checking the box, the sizing method used to derive the calculations in the following table:

Resort Sizing Factor Method for Infiltration BMPs (Master WQMP Section 3.7.4) (preferred)
Simple DCV method (TGD Section III.3.1)
Capture efficiency method for volume-based BMPs (TGD Section III.3.2) Show calculations (in this section or by reference to Attachment(s) A and/or E) to demonstrate how the LID DCV can be met with biotreatment with infiltration BMPs.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 17
Summary Table Utilizing Resort Biotreatment with Infiltration Sizing Factor This summary table includes sample entries. Enter the details in the text boxes for the sizing of biotreatment with infiltration BMPs used for the project, if applicable. Add or delete rows as needed.

Complete feasibility worksheet (Master WQMP, Appendix 3-B) in include in Attachment A, if applicable. Include a copy of the geotechnical investigation or report in Attachment E.

DMA
ID
Area,
ac
%
Imp
BMP
Surface
Area
Required,
sq-ft1

LID BMP
BMP
Surface
Area
Provided,
sq-ft1
Sizing Method; Location of
Worksheet/
Calculations
A-1 0.22 100% 400 Bioinfiltration Planter
with Elevated
Underdrains
400 Resort Partial Infiltration
Sizing Factor method:

Attachment A
IV.3.2.3 Rainwater Harvesting BMPs (Category 3 Feasibility Conditions) Preparer: Before utilizing biotreatment BMPs, evaluate opportunities for rainwater harvesting BMPs.

NOTE: It will be uncommon to have rainwater harvesting BMPs within the Resort due to lack of demand for harvested water, but if opportunities are present, describe below. Otherwise, check “not applicable”.

This category is not applicable to this project.

This category applies to this project.

Preparer: if rainwater harvesting and use is included for this project, add a description in the box by replacing the “Not Applicable” text. Describe any rainwater harvesting BMPs included. Provide summary table and sizing calculations or checklist/worksheet (Master WQMP, Appendix 3-B).

Otherwise, leave “Not Applicable” as noted.

Rainwater harvesting BMPs were considered for this project as follows:

Not Applicable
IV.3.2.4 Biotreatment BMPs (Category 3 Feasibility Conditions) Preparer: If biotreatment BMPs are proposed for this project indicated by checking the box.

This category is not applicable to this project.

This category applies to this project.

Indicate in the following table the biotreatment BMPs to be used in project. If others are considered, enter the name.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 18
Name Included?
Bioretention with underdrains
Stormwater planter boxes with underdrains
Rain gardens with underdrains
Proprietary vegetated biotreatment systems
Other:

Other:

Select, by checking the box, the sizing method used to derive the calculations in the following table:

Resort Sizing Factor Method for Biotreatment with (Partial) Infiltration BMP (Master WQMP Section 3.7.4) (preferred) (set infiltration rate to zero when using this method for biotreatment only BMPs)
Simple DCV method (TGD Section III.3.1)
Capture efficiency method for volume-based BMPs (TGD Section III.3.2) Capture efficiency method for flow-based BMPs (TGD Section III.3.3) Summary Table for Biotreatment BMPs
This summary table includes sample entries. Enter the details in the text boxes for the sizing of biotreatment BMPs used for the project, if applicable. Add or delete rows as needed. Complete feasibility worksheet (Master WQMP, Appendix 3-B) in include in Attachment A, if applicable. Include a copy of the geotechnical investigation or report in Attachment E.

DMA
ID
Area,
ac
%
Imp
BMP Surface
Area
Required, sqft1

LID BMP
BMP Surface
Area Provided,
sq-ft1
Sizing Method;
Location of Worksheet/
Calculations
A-1 0.22 100 450 Bioretention
with
Underdrains
450 Resort Partial
Infiltration Sizing Factor
Method; Attachment A
IV.3.3 Sub-Watershed LID BMPs
Preparer: if the project will create or participate in a sub-watershed BMP, delete the “Not applicable” text box and complete this section. Refer to Master WQMP Section 3.5 and Section 4 for guidance.

Otherwise leave “Not applicable”.

Sub-Watershed BMP Description
Preparer: Use the text box to provide a description of the sub-watershed BMP that includes the following:
 Describe the sub-watershed BMP type, why selected, location and other relevant information.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 19
 Describe in general if this sub-watershed BMP is being installed as part of a project, as a standalone sub-watershed BMP, retrofit of an area (with or without a project), or if an existing subwatershed BMP with available credits is being used for compliance for a project with constraints or infeasibility conditions.
 Show the sub-watershed BMP, tributary area, and project footprint on the BMP Exhibit/Site Plan and include in Attachment C.

Complete the tables, if sub-watershed LID BMPs is proposed in this WQMP.

Sub-watershed BMP Acceptance Criteria
Preparer: Complete all answers by checking Yes, No, or N/A (Not Applicable) as appropriate. A partial listing of the table is shown below for illustration purposes.

Acceptance Question
Response
(Yes, No
or NA)
Guidance
 Is this a stand-alone sub-watershed
BMP, being developed for future
constrained projects?
Yes
No
N/A
If Yes, include a sub-watershed BMP
Exhibit/Site Plan; skip to item No. 5
 Will the sub-watershed BMP be
constructed prior to occupancy of
the development project it is
associated with?
Yes
No
N/A
If this is a stand-alone sub-watershed
BMP project, then this question is not
applicable.

Preparer: Indicate by selecting one of two options, how the sub-watershed BMP included in this WQMP will be applies or used:

Option 1. A new Sub-Watershed BMP is part of this project. Details are provided in Option 1 and in the table below.

Option 2. A pre-existing Sub-Watershed BMP is available and operational for this project with BMP credits proposed to meet the DCV. The details are provided in Option 2 and in the table below.

Preparer:
 For both options, include a copy of the current Master WQMP Project Tracking Sheet (Master WQMP Appendix 5-A) that is available from Environmental Affairs as Attachment D of the WQMP document. Environmental Affairs must be contacted in advance to coordinate preparation and submittal of the Master WQMP Project Tracking Sheet.  Complete the information based on the selection of Option 1 or 2 by including the data requested.

The choice and data should correspond to the description given above for the Sub-Watershed BMP.

Option 1. BMP Capacity Tabulation for New Sub-watershed BMP Preparer: Complete the BMP Capacity Tabulation table for the New Sub-watershed BMP.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 20
Parameter Value Guidance
Total Tributary Area to Subwatershed BMP, ac (Asubwshed) Tabulate total tributary area to the
diversion structure to the subwatershed BMP. Show the BMP location and tributary are on the BMP
Exhibit/Site Plan
Long Term Efficiency of Subwatershed Runoff Volume by Subwatershed BMP, (% Cap) Provide capture efficiency worksheet (Appendix 4-C.2)
Equivalent Developable Area, ac
(Adevelopable)
Asubwshed × [%cap/80%]
Development Project Footprint Area,
ac (Aproject)
Footprint of the development project
contained in this WQMP
Surplus Developable Area, ac Adevelopable - Aproject
Option 2. BMP Capacity Tabulation for Pre-existing Sub-watershed BMPs Preparer: Complete the BMP Capacity Tabulation table for the Pre-existing Sub-watershed BMP being proposed for this project.

NOTE: Information on the current available capacity (Aavailable) of an existing sub-watershed BMP is required and must be obtained from Environmental Affairs along with a copy of the current Master WQMP Project Tracking Sheet to include in Attachment D, if a project is seeking credits to meet the full or a fraction of the DCV requirements.

Parameter Value Guidance
Development Project Footprint Area,
ac (Aproject)
Footprint of the development project
contained in this WQMP
Remaining Available Capacity in Subwatershed BMP before Project, ac (Aavailable )
Provide BMP Exchange Tracking Sheet
to demonstrate available capacity
Remaining Available Capacity in Subwatershed BMP after Project, ac Aproject – Aavailable IV.3.4 Treatment Control BMPs
Preparer: Using the table provided in the WQMP template, describe treatment control BMPs including the reason for the selection, sizing, and infeasibility, as applicable. Add or delete rows as needed. Provide any supporting documentation in an attachment.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 21
Treatment Control BMPs
BMP Name BMP Description

IV.3.5 Non-structural Source Control BMPs
Preparer: Check the box for any non-structural source control BMPs that are not marked that apply to this project and provide a brief narrative, if applicable. The most common default non-structural source control BMPs for the Resort have been checked as “Included” and the reason stated as “Per the Resort’s Master WQMP”(Examples: N1 and N2). Any default BMPs that will not be included in the project need to be changed to “Not Applicable” and an explanation provided.

BMPs that may apply and are not checked (e.g., N3) should be considered and the reason stated, if needed.

Do not alter the main elements of the table or rows.

Non-Structural Source Control BMPs
Identifier Name
Check One If not applicable,
Included Not state brief reason
Applicable
N1
Education for Property
Owners, Tenants and
Occupants
Per the Resort’s Master
WQMP
N2 Activity Restrictions Per the Resort’s Master
WQMP
N3 Common Area Landscape
Management
Per the Resort’s Master
WQMP
N4 BMP Maintenance
Per the Resort’s Master
WQMP and as noted in this
project WQMP
IV.3.6 Structural Source Control BMPs
Preparer: Check the boxes as needed for structural source controls for the project. Select the appropriate reason based on whether the BMP is included or not applicable for the project. A partial table is provided to illustrate the entries needed. The reason should be edited modifying the default text as applicable.

NOTE: the “Or” options should be edited accordingly.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 22
Structural Source Control BMPs
Identifier Name
Check One If not applicable,
state brief reason Included Not
Applicable
S1 Provide storm drain system
stenciling and signage
No storm drain inlets Or Per
the Resort’s Master WQMP
S2
Design and construct
outdoor material storage
areas to reduce pollution
introduction
No outdoor storage areas Or
Per the Resort’s Master
WQMP
S3
Design and construct trash
and waste storage areas to
reduce pollution
introduction
No trash and waste storage
areas included in this project
Or Per the Resort’s Master
WQMP
IV.4 BMP Exchange
Preparer: Complete this section if credits are either generated or utilized as part of the project. See Master WQMP Section 5.2 for overall guidance on documenting participation in the BMP Exchange. Use and attach the current Master BMP Project Tracking Sheet (Master WQMP Appendix 5-B) obtained from Environmental Affairs. Details on the BMP Exchange as applicable to this project are summarized in the table at the end of this section, as shown below.

IV.4.1 Eligibility to Participate in BMP Exchange
Preparer: Provide supporting eligibility documentation. See Section 5.2 of the Master WQMP for guidance and criteria. Not Applicable is provided as a default and should be edited to describe the eligibility, reasons and conditions for the BMP Exchange participation. Note that either credit utilization or generation is generally applicable and either section IV.4.2 or IV.4.3 below should be completed as needed.

IV.4.2 Credit Utilization Documentation
Preparer: Provide a summary of the calculations of the quantity and type of BMP Exchange credits needed for the project. Complete the details in the table at the end of the section. See Section 5.2 of the Master WQMP for more information.

IV.4.3 Credit Generation Documentation
Preparer: Provide a summary of the calculations for credit generating BMPs. Complete the details in the table at the end of the section. See Section 5.3 of the Master WQMP for more information.

IV.4.4 Summary of BMP Exchange Activity
Preparer: Complete the following table to summarize the BMP Exchange activity described above. Also include in Attachment D the current version of the Master WQMP Project Tracking Sheet obtained from Environmental Affairs. See Section 5.3.6 for guidance on the BMP Exchange Tracking Methodology.

Contact Environmental Affairs for the latest version of the Master WQMP Project Tracking Sheet.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 23
NOTE: multiple Resort projects may be under consideration simultaneously and the latest and most current version of the Master WQMP Project Tracking Sheet is managed by Environmental Affairs.

Summary of BMP Exchange Activity
Starting Balance
Credit type (enter in the appropriate column)  Roads/Parking Other BMP Exchange Balance Prior to Project (sq-ft)
Credit Generation
Is the project adding to the BMP Exchange? Yes No
If Yes:

Credit type (enter in the appropriate column)  Roads/Parking Other Project-based BMP Credit Generated (sq-ft)
Sub-Watershed BMP Credit Generated (sq-ft)
New BMP Exchange Balance (sq-ft)
Attach Worksheet in Master WQMP Appendix 5-B to show exchange calculations.

Credit Utilization
Is the project utilizing credits from the BMP Exchange? Yes No Is the project eligible to utilize the BMP Exchange?
Yes, credits are being subtracted from a sub-watershed BMP for a tributary project Yes, as part of alternative compliance. See Section IV.4.2.

Credit type (enter in the appropriate column)  Roads/Parking Other BMP Exchange Credits Utilized (sq-ft)
Ending Balance
Has BMP Exchange sheet been modified to reflect changes? Yes No Credit type (enter in the appropriate column)  Roads/Parking Other BMP Exchange Balance After Project (sq-ft)
Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 24
Section V Inspection/Maintenance Responsibility for BMPs Preparer: Prepare and attach an Operation and Maintenance Plan. Identify the funding mechanism through which BMPs will be maintained, if applicable. Inspection and maintenance records must be kept for a minimum of five years for inspection by the regulatory agencies. Refer to Section 7.II 4.0 in the Model WQMP. Do not edit this table, except to list additional BMPs at the end, if applicable. A partial table is provided to illustrate the type of information needed and should be listed for BMP Inspection and Maintenance.

BMP Inspection/Maintenance
BMP Responsible
Party(s)
Inspection/ Maintenance
Activities Required
Minimum
Frequency of
Activities
N1, Education for
Property Owners,
Tenants and
Occupants
Director,
Environmental
Affairs and
Conservation
Owner, tenants, and
contracted personnel are
provided training using
specified materials.

Educational
Materials updated
as needed
N3, Common Area
Landscape
Management
Director,
Horticulture and
Resort
Enhancement
Verify that the irrigation
system is working properly;
Check for broken sprinkler
heads and verify proper
coverage.  Adjust valve run
times to avoid over‐watering
and/or ponding in landscape
areas.

Ongoing; system to
be repaired or
replaced as
necessary
N4, BMP
Maintenance
Director,
Engineering
Services
Verify BMP is operating as
intended; verify that no
damage has occurred after
storm events.

Inspected and/or
cleaned quarterly,
and as needed
N10, Uniform Fire
Code
Implementation
General Manager,
Security &
Emergency
Services
Comply with Article 80 of the
Uniform Fire
Code.

Ongoing
N11, Common
Area Litter
Control
General Manager,
Park Operations
and Guest
Services
Pick up debris and trash to
maintain a clean site.  Sweep
out trash storage area(s) and
pick up loose debris and
trash.

Daily litter removal
S1, Provide storm
drain stencilling
and signage
Director,
Engineering
Services
Verify legibility of prohibitive
language markers and signs
at storm drain inlets and
catch basins and replace as
needed.

Annually, replace
as needed
Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 25
S4, Use efficient
irrigation systems
& landscape
design, water
conservation,
smart controllers,
and source control
Director,
Horticulture and
Resort
Enhancement
Implement application
methods of irrigation water to
minimize runoff of excess
irrigation water into the
storm water conveyance
system, correct as necessary.

Monthly, correct as
needed

Section VI BMP Exhibit (Site Plan)
VI.1 BMP Exhibit (Site Plan)
Preparer: Include a BMP Exhibit (Site Plan) in Attachment C, at a size no less than 24” by 36,” which includes the following minimum information:
 Insert in the title block (lower right hand corner) of BMP Exhibit: the WQMP Number (assigned by staff) and the grading/building or Planning Application permit numbers  Project location (address, tract/lot number(s), etc.)  Project boundary
 Land uses and land covers, as applicable
 Infiltration feasibility constraints
 Structural BMP locations
 Drainage delineations and flow information
 Delineate the area being treated by each structural BMP  GIS coordinates for LID and Treatment Control BMPs
 Drainage connections
 BMP details, additional sheets may be included if needed  Sub-watershed BMP location and tributary area delineation, if applicable  Preparer name and stamp
 Any additional information or details as required based on entries in the above sections Do not include any areas outside of the project area (unless relevant as tributary area to a sub-watershed BMP) or any information not related to drainage or water quality. The approved BMP Exhibit (Site Plan) shall be submitted as a plan sheet on all grading and building plan sets submitted for plan check review and approval. The BMP Exhibit shall be at the same size and scale as the rest of the plan sheets in the submittal and shall have an approval stamp and signature prior to plan check submittal.

VI.2 Submittal and Recordation of Water Quality Management Plan Preparer: A PDF version of the final, approved WQMP shall be submitted by email to Environmental Affairs. The approved Final Project WQMP is submitted to the City in triplicate (including BMP Exhibit, Operations and Maintenance (O&M) Plan, and Appendices). In addition, these documents shall be submitted in a PDF format.

Project Water Quality Management Plan (WQMP) Template
DISNEYLAND RESORT User’s Guide
December 2014 Page 26
Section VII Educational Materials
Preparer: No modifications are needed for this section. Supplemental Educational Materials should not be included.

Attachment Title Pages
Preparer: Use the cover sheets provided for each attachment section as dividers between the appropriate attachments.

Disneyland Resort Master WQMP
Section 3: Post Construction BMP Methodology
LaRoc Environmental December 2014 – Final
Appendix 3‐D
Disneyland Resort Non‐Priority Project
WQMP Template

NON-PRIORITY PROJECT WATER QUALITY PLAN
(NPPP)
For:
(Insert Project Name)
1515 South Harbor Boulevard
Anaheim, California, 92802
Prepared for:

Walt Disney Imagineering
1020 W. Ball Road, DLR-794
Anaheim, California, 92802
(Insert Contact Name)
(Insert Telephone)
(Insert Email Address)
Prepared by:
(Insert Preparer or Consulting/Engineering Firm Name)
(Insert Address)
(Insert City, State, ZIP)
(Insert Contact Name)
(Insert Telephone)
(Insert Email Address)
(Insert Date Prepared/Revised)
Reviewed for compliance with the Local Implementation Plan:
_____________________________
Public Works Director Date

__________________________
City Engineer Date
Page -1- Disneyland Resort Master WQMP
December 2014
Non-Priority Project Water Quality Plan (NPPP)
The Orange County Stormwater Program has developed this Non-Priority Project Water Quality Plan (NPPP) for new development / significant redevelopment projects that do not meet the criteria for Priority Projects as defined within the County’s Model Water Quality Management Plan (see Model WQMP Sections 1.3 and 1.4) but that qualify as Non-Priority Projects as defined in the Drainage Area Management Plan (DAMP). These projects are required under the Santa Ana Regional Board MS4 Permit (North Orange County Permit) to “document, via a WQMP or similar mechanism, site design, source control and any other BMPs which may or may not include treatment control BMPs”. This plan covers both private and public agency projects that qualify as Non-Priority Projects.

Qualifying Non-Priority Projects are projects that do not fall under one of the Priority Project Categories defined within the Model WQMP but meet one of the following conditions:
 Require discretionary action that will include a precise plan of development, except for those projects exempted by the Water Quality Ordinance (as applicable); or  Require issuance of a non-residential plumbing permit for hazardous pipelines as defined in the County or local Water Quality / Stormwater Ordinance. Non-residential plumbing projects that do not pose a potential threat to public safety do not require a WQMP for approval.

A “discretionary action” under CEQA is defined as “an activity which requires the public agency to exercise judgment in deciding whether to approve or disapprove the particular activity, as distinguished from situations where the public agency merely has to determine whether there has been conformity with applicable ordinances or other laws.” (California Public Resources Code § 21080(a); CEQA Guidelines § 15357). Examples of discretionary actions include: feature plans, area plans, use permits, site development permits and special use permits. “Ministerial actions” under CEQA are those where little or no judgment or deliberation by a Permittee is required or possible. Generally, the only example of a ministerial approval action that would qualify as a Non-Priority Project would be a project that requires the issuance of a Non-Residential Plumbing Permit.

All other projects and activities that only require a ministerial grading or building permit for which the Permittee has no discretion to approve do not fall under the requirements of this new development program, with the exception of projects that require a Non-Residential Plumbing Permit.

This plan is provided for summarizing basic project information and stormwater Best Management Practices that are planned for controlling discharges of pollutants from proposed Non-Priority Projects and identify applicable source conrol BMPs, site design features, and determine BMP maintenance requirements. Non-Priority Project proponents are required to complete the plan for local jurisdiction review and approval. Applicable sections of the Technical Guidance Document are referenced for assistance with completing each NPPP section. All Non-Priority Project Water Quality Plans must be in compliance with the Local Implementation Plan developed by each local agency. The local jurisdiction may request additional information necessary for local Non-Priority Project review and approval.

Local jurisdictions may modify existing templates for local program implementation to incorporate the information contained in this Plan provided all information necessary to meet requirements contained in the MS4 Permit and the DAMP for Non-Priority Projects are contained within the local plan.

Page -2- Disneyland Resort Master WQMP
December 2014
Non-Priority Project Water Quality Plan
Contents
Section I: General Information……………………….……………………………….. 3 Section II: Project Description……………………………………………………….... 5 Section III: Site Description……………………………………………………….……6
Section IV: Best Management Practices (BMPs)…………………...............................7 Section V: Inspection and Maintenance Responsibilities…………………………... 13 Section VI: Plot Plan…………………………………………………………….……. 14
References:

Model WQMP
Technical Guidance Document
California BMP Handbooks
Page -3- Disneyland Resort Master WQMP
December 2014
Non-Priority Project Water Quality Plan
Section I – General Information
See Technical Guidance Document Section 2.2.1 for additional information.

Project Name ENTER PROJECT NAME
Tract ENTER TRACT NUMBER
Lot ENTER LOT NUMBER
APN ENTER ASSESSOR’S PARCEL NUMBER
Planning Area ENTER PLANNING AREA
Prepared For:

Owner/Developer
Walt Disney Imagineering
Address 1020 W. Ball Road, DLR-794
Anaheim, California, 92802
Phone ENTER PHONE NUMBER
Fax ENTER FAX NUMBER
Prepared by:

Name ENTER PREPARER’S NAME
Address ENTER ADDRESS
Phone ENTER PHONE NUMBER
Email ENTER EMAIL ADDRESS
Fax ENTER FAX NUMBER
Date Prepared ENTER DATE PREPARED
Date(s) Revised ENTER DATE REVISED
Date Finalized ENTER DATE FINALIZED
Page -4- Disneyland Resort Master WQMP
December 2014
Owner’s Certification
This Non-Priority Project Water Quality Plan has been prepared for:

Walt Disney Imagineering
By:

Enter Preparer’s Name
The plan is intended to comply with the Non-Priority Project requirements of the Local Implementation Plan (LIP) §A-7.5.1 as required in the Orange County Drainage Management Plan (DAMP) § 7.6.2.

The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan. Once the undersigned transfers its interests in the property, its successor-in-interest shall bear the aforementioned responsibility to implement the best management practices (BMP) described within this plan. A signed copy of this document shall be available on the subject property into perpetuity.

Signed
Name Rich Langhorst
Title Vice President, Facilities & Operations Services
Company Disneyland Resort, a division of Walt Disney Parks and Resorts U.S., Inc
Address 1313 South Harbor Boulevard
Anaheim, California, 92802
Phone 714.254.2400
Date ENTER DATE
Page -5- Disneyland Resort Master WQMP
December 2014
Section II: Project Description
Please provide a detailed description of the project’s ownership, type of development project, amount of paved and landscaped area, and potential pollutants that may be generated by the intended development uses. See Technical Guidance Document Section 2.2 for additional information.

Property Ownership
The project is located in the Disneyland Resort. The Resort is a division of Walt Disney Parks and Resorts U.S., Inc.

Project Description
The project is located within the NOC permit area in the city of Anaheim in Orange County, California. The project is DESCRIBE THE FUNCTION, PURPOSE, AND DISTRICT NAME.

Paved Areas
LIST THE TYPE (E.G. PARKING LOT) AND AREA (SQUARE FEET) Landscaped Areas

LIST THE LOCATION AND AREA (SQUARE FEET) OF ALL LANDSCAPED AREAS Potential Stormwater Pollutants

LIST POTENTIAL STORMWATER POLLUTANTS BASED ON PROPOSED PROJECT LAND USE AND THE TABLE BELOW.

Page -6- Disneyland Resort Master WQMP
December 2014
Anticipated and Potential Pollutants for the Resort Land Uses (Adapted from TGD Table 2.1) Land Use Category and
Sub‐Categories
Pollutant
Suspended
Solids/ Sediment
Nutrients
Metals
Bacteria
&
Viruses
Pesticides
Oil
& Grease
Toxic Organic
Compounds
Trash and Debris
Commercial/Industrial Development P(1) P(1) P(5) P(3) P(1) Yes Yes(7) Yes Roofs(6) P    P P    P
Pedestrian Areas P(2)       P(4)          Yes
Restaurants P(1)(2) P(1) P(2) Yes P(1) Yes    Yes
Parking Lots Yes P(1) Yes P(4) P(1) Yes Yes Yes
Streets Yes P(1) Yes P(4) P(1) Yes Yes(7) Yes
P=Potential pollutant
(1) A potential pollutant if landscaping exists on‐site (2) A potential pollutant if uncovered parking areas are included in the project (3) A potential pollutant if food or animal waste products are involved (4) Analyses of pavement runoff routinely exhibit bacterial indicators (5) A potential pollutant if there is outdoor storage/metal roofs (6) Assumes no HVAC or other equipment on roof top
(7) Including petroleum hydrocarbons
Section III: Site Description
See Technical Guidance Document Section 2.3 for additional information.

Address 1515 South Harbor Boulevard
Anaheim, California, 92802
Planning Area
Land Use
Zoning SP 92-1
Acreage
Predominant Soil
Type
Refer to OC Web Data Portal http://landrecords.ocpublicworks.com/ocsl/ and/or site specific investigation
Drainage Conditions
Please provide site drainage details, including how site drainage ties into adjacent property drainage patterns, local storm drain systems, and downstream receiving waters.

Page -7- Disneyland Resort Master WQMP
December 2014
Pre-Project Pervious Conditions
Area (acres or sq ft) Percentage
Pervious
Impervious
Completed Project Pervious Conditions
Area (acres or sq ft) Percentage
Pervious
Impervious
Watershed Information
Watershed Anaheim-Barber City Channel
Receiving Waters Anaheim-Barber City Channel (C03), Bolsa Chica Channel, Bolsa Chica State Beach, Sunset-Huntington Harbour, Seal Beach, Anaheim Bay, and the Pacific Ocean.
303(d) Impairments Pesticides (Dieldrin, Chlordane), Metals (Copper, Lead, Nickel), Pathogens, Priority Organics (PCB’s), Sediment Toxicity, Nutrients (Ammonia, unionized) TMDLs None
Known ESAs None
Known ASBSs None
Section IV: Best Management Practices (BMPs)
Site Design BMPs
Site Design BMPs reduce the volume of stormwater runoff generated on a project site as well as improve the quality of runoff that leaves the site, and are required for all proposed Non-Priority new development and significant redevelopment projects. Descriptions of the most common Site Design BMPs are provided in County’s Technical Guidance Document (see Technical Guidance Document Sections 3 and 4). A list of typically employed Site Design BMPs may be found in the California BMP Handbooks (California Stormwater Quality Association). Additional information is also found in the Resort’s Master WQMP, Section 3.4.

The following table provides a list of Site Design BMPs applicable to the project. Please identify each Site Design BMP included for the project, and briefly describe within the table.

Page -8- Disneyland Resort Master WQMP
December 2014
Table 1: Site Design BMPs
Name Check If
Included Brief Description
Retention Grading
Downspout Dispersion X SAMPLE: Splashblocks are proposed for all roof downspouts Downspout Infiltration X SAMPLE: Portion of the roof will drain to landscaped areas or a vegetated swale as shown in the drawings.

Amended Soils Over Tight
Underlying Soils
Street Trees, Canopy
Interception X SAMPLE: Street trees will be placed along walkways and street corridors as shown in the drawings.

Use of drought tolerant
trees/shrubs
Minimize Use of Impervious
Surfaces in Landscape Design X SAMPLE: Did not use decorative concrete in the design Walkways constructed with
permeable surfaces X SAMPLE: The walkway addition will be constructed using permeable pavers.

Page -9- Disneyland Resort Master WQMP
December 2014
SOURCE CONTROL BMPs
Source Control BMPs, both non-structural and structural, are required for Non-Priority Projects where applicable to project features. The Disneyland Resort has identified the default non-structural source control BMPs in section 3.4.2 of the Master WQMP. Any deviations from the Master WQMP are noted below. Please identify each applicable Source Control BMP for the project within the following tables.

See Master WQMP sectin 3.4.2 or the County’s Technical Guidance Document Section 6 for additional information.

Table 2: Non-Structural Source Control BMPs
Non-Structural Source Control BMPs
Identifier Name
Check One
If not applicable, state brief
reason Included Not
Applicable
N1 Education for Property Owners,
Tenants and Occupants Per the Resort’s Master WQMP
N2 Activity Restrictions Per the Resort’s Master WQMP
N3 Common Area Landscape
Management Per the Resort’s Master WQMP
N4 BMP Maintenance
Per the Resort’s Master WQMP
and as noted in this project WQMP
N5 Title 22 CCR Compliance (How
development will comply)
No hazardous waste stored as part
of this project
or explain
N6 Local Industrial Permit Compliance Not an industrial use N7 Spill Contingency Plan
No hazardous waste stored as part
of this project
Or explain
N8 Underground Storage Tank
Compliance
No underground storage tanks on
project site
Or explain
N9 Hazardous Materials Disclosure
Compliance
No hazardous materials used/
stored as part of this project
Or explain
N10 Uniform Fire Code Implementation Per the Resort’s Master WQMP N11
Common Area Litter Control
No common area litter control
Or
Litter management managed per
existing protocols described in
Master WQMP
N12 Employee Training Per the Resort’s Master WQMP
Page -10- Disneyland Resort Master WQMP
December 2014
N13 Housekeeping of Loading Docks
No loading docks on project site
Or explain
N14
Common Area Catch Basin Inspection
No common area catch basins
Or
Per the Resort’s Master WQMP
N15 Street Sweeping Private Streets and
Parking Lots
No private streets or parking lots
Or
Per the Resort’s Master WQMP
N16 Retail Gasoline Outlets No retail gasoline outlets on project site
Table 3: Structural Source Control BMPs
Structural Source Control BMPs
Identifier Name
Check One
If not applicable, state brief
reason Included Not
Applicable
S1 Provide storm drain system stenciling
and signage
No storm drain inlets
Or Per the Resort’s Master WQMP
S2
Design and construct outdoor material
storage areas to reduce pollution
introduction
No outdoor storage areas
Or
Per the Resort’s Master WQMP
S3
Design and construct trash and waste
storage areas to reduce pollution
introduction
No trash and waste storage areas
included in this project.

Or
Per the Resort’s Master WQMP
S4
Use efficient irrigation systems &
landscape design, water conservation,
smart controllers, and source control
No landscape irrigation
Or
Per the Resort’s Master WQMP
S6 Dock areas No dock areas in this project
S7 Maintenance bays No maintenance bays in this project S8 Vehicle wash areas No vehicle wash areas in this project S9 Outdoor processing areas No outdoor processing areas in this project
S10 Equipment wash areas No equipment wash areas in this project
S11 Fueling areas No fueling areas in this project
S13 Wash water control for food
preparation areas
No food preparation areas in this
project
Page -11- Disneyland Resort Master WQMP
December 2014
The table below summarized the inspection, operation, and maintenance responsibilities for this project’s BMPs.

Table 4. Source Control BMP Implementation
BMP Inspection/Maintenance
BMP Responsible
Party(s)
Inspection/
Maintenance
Activities Required
Minimum
Frequency of
Activities
N1, Education for
Property Owners,
Tenants and
Occupants
Director,
Environmental
Affairs and
Conservation
Owner, tenants, and
contracted personnel are
provided training using
specified materials.

Educational Materials
updated as needed
N3, Common Area
Landscape
Management
Director,
Horticulture and
Resort
Enhancement
Verify that the irrigation
system is working
properly; Check for
broken sprinkler heads
and verify proper
coverage.  Adjust valve
run times to avoid over‐
watering and/or ponding
in landscape areas.

Ongoing; system to be
repaired or replaced
as necessary
N4, BMP
Maintenance
Director,
Engineering
Services
Verify BMP is operating
as intended; verify that
no damage has occurred
after storm events.

Inspected and/or
cleaned quarterly, and
as needed
N9, Hazardous
Materials
Disclosure
Compliance
General Manager,
Security &
Emergency
Services
Comply with
County/City ordinances
on
Hazardous Materials
Disclosure.

Ongoing
N10, Uniform Fire
Code
Implementation
General Manager,
Security &
Emergency
Services
Comply with Article 80
of the Uniform Fire
Code.

Ongoing
Page -12- Disneyland Resort Master WQMP
December 2014
N11, Common Area
Litter Control
General Manager,
Park Operations
and Guest
Services
Pick up debris and trash
to maintain a clean site.

Sweep out trash storage
area(s) and pick up
loose debris and trash.

Daily litter removal
N12, Employee
Training
Director,
Environmental
Affairs and
Conservation
Employees responsible
for the implementation
of this WQMP shall be
familiar with this
document and shall be
provided with classes,
seminars, etc. to satisfy
on‐going BMP training.

Training within one
month of start date,
annually thereafter
(prior to October
1st)
N14, Common Area
Catch Basin
Inspection
Director,
Engineering
Services
Inspect drain inlets and
catch basins.

Ensure that area drains
in landscaped areas are
clear of debris and
sediment.

Rainy Season:

Once prior to
October 1st and
monthly or as
needed thereafter
Dry Season:

As needed
N15, Street Sweeping
Private Streets and
Parking Lots
General Manager,
Park Operations
and Guest
Services
Sweep parking lot using
street sweepers.  Twice per week.

S1, Provide storm
drain stencilling and
signage
Director,
Engineering
Services
Verify legibility of
prohibitive language
markers and signs at
storm drain inlets and
catch basins and replace
as needed.

Annually, replace as
needed
S4, Use efficient
irrigation systems &
landscape design,
water conservation,
smart controllers,
and source control
Director,
Horticulture and
Resort
Enhancement
Implement application
methods of irrigation
water to minimize
runoff of excess
irrigation water into the
storm water
conveyance system,
correct as necessary.

Monthly, correct as
needed

Page -13- Disneyland Resort Master WQMP
December 2014
Other BMPs
Other BMPs or devices incorporated to remove pollutants from runoff leaving the project site, which may or may not include Treatment Control BMPs (see Technical Guidance Document Section 4.6), are not required for Non-Priority Projects though may be appropriate under certain conditions. Please provide details on any other BMPs selected for this project. If a LID or Treatment BMP is implemented as a subwatershed BMP for BMP credits, then a Priority Project WQMP Template must be used to document the design and provide the credit calculations.

Table 4: LID and Treatment Control BMPs
Name Check If
Included Brief Description
SubWatershed
BMP? Y or N
Infiltration Basins
Infiltration Trenches
Bioretention without
Underdrains
Drywells
Permeable Pavement X SAMPLE: Downtown Disney Parking Lot will be constructed using permeable pavement Y
Subsurface
Infiltration Galleries
Vegetated Swale with
Sump X
SAMPLE: Swale adjacent to proposed walkway will
be contoured to retain storm water runoff and
vegetated with drought tolerant grasses/shrubs
N
Bioretention with
Elevated Underdrains
Dry Extended
Detention Basin with
Sump
Proprietary BMP
Page -14- Disneyland Resort Master WQMP
December 2014
Section V: Plot Plan
A plot plan must be attached that contains the following project features:
 Each facility and its intended function (if multiple facilities and uses are present onsite)
 Areas of outdoor activities (if applicable)
 Applicable Structural Source Control BMPs and any Treatment Control BMPs  Drainage flow information
 Storm drain facilities
 Relationship between onsite drainage and offsite drainage The plot plan must contain the following labels:
 Title Block
o Drainage Plot Plan
o Project Name
o Address
o Owner
o Label plot as “Section V”
 Legend
 North Arrow
 Scale

Project proponents should submit the plot plan with BMP details in electronic drawing or GIS format.

Disneyland Resort Master WQMP
Section 3: Post Construction BMP Methodology
LaRoc Environmental December 2014 – Final
Appendix 3‐E
Disneyland Resort WQMP Review
Checklist and Closeout Form

Water Quality Management Plan (WQMP) Checklist
for
Disneyland Resort Projects
(From Orange County DAMP Exhibit A-7.III)

Disneyland Resort Master WQMP     Appendix 3‐E
December 2014  Page 2 of 7  WQMP Checklist
Water Quality Management Plan Checklist for Disneyland Resort Projects The purpose of this checklist is to provide a format for uniform, comprehensive, and welldocumented reviews of the Water Quality Management Plans (WQMPs) submitted by project applicants. The completed checklist should be transmitted to the project applicant with the project WQMP. A copy of the completed checklist should be retained with the project planning/permitting file.

Disneyland Resort-specific Information: This checklist has been marked in underline/strikethrough format to indicate standard elements that are not applicable to Resort and identify additional elements that should be checked as part of City review.

City Planning Project Number:

Project Name:

Project Address: 1313 South Harbor Boulevard, 92802
First Review
WQMP Received on:

Review Completed on:

Second Review
WQMP Received on:

Review Completed on:

Third Review
WQMP Received on:

Review Completed on:

Signature of Reviewer: Date:

Disneyland Resort Master WQMP     Appendix 3‐E
December 2014  Page 3 of 7  WQMP Checklist

WQMP REQUIREMENT
Requirement
Satisfied?
Yes No N/A
Title Page
Name of project
Application and/or Tract Number
Lot number(s) if site is a portion of a Tract
Site address (or addresses) and planning area number
Owner/Developer name
Owner/Developer address & telephone number
Consulting/Engineering firm that prepared WQMP
Consulting/Engineering firm address & phone number
Date WQMP was prepared/revised
Owner’s Certification
A signed certification statement, in which the project owner acknowledges and accepts the provisions of the WQMP, follows the title page.

Table of Contents
A Table of Contents, including a list of all figures and attachments is included.

Section 1.0, Permit Numbers and Conditions of Approval
Lists the Discretionary Permit(s).

The lot & tract/parcel map number describing the subject property.

Lists, verbatim, the Water Quality Conditions, including condition requiring preparation of WQMP, if applicable.

Final Resolution of Approval, Conditional Use Permit, etc. is included as an Attachment to the WQMP.

Section 2.0, Project Description
For All Projects:

Identifies planning area or community name.

Does the project description completely and accurately describe where facilities will be located, what activities will be conducted and where on the site, what kinds of materials and products will be used, how and where materials will be received and stored, and what kinds of wastes will be generated?

Describes all paved areas, including the type of parking areas.

Describes all landscaped areas.

Disneyland Resort Master WQMP     Appendix 3‐E
December 2014  Page 4 of 7  WQMP Checklist

WQMP REQUIREMENT
Requirement
Satisfied?
Yes No N/A
Describes ownership of all portions of project and site.  Will any infrastructure transfer to public agencies (City, County, Caltrans, etc.)?
 Will a homeowners or property owners association be formed?  Will the association be involved in long term maintenance?

Identifies the potential stormwater or urban runoff pollutants reasonably expected to be associated with the project.

Identifies post development drainage characteristics.

For Commercial and Industrial Projects:
 Provides Standard Industrial Classification (SIC) Code which best describes the facilities operations?
 Describes the type of use (or uses) for each building or tenant space
 Does project include food preparation, cooking, and eating areas (specify location and type of area)
 Describes delivery areas and loading docks (specify location and design and if below grade and types of materials expected to be stored

 Describes outdoor materials storage areas (describe and depict location(s), specify type(s) of materials expected to be stored)  Describes activities that will be routinely conducted outdoors  Describes any activities associated with equipment or vehicle maintenance and repair, including washing or cleaning.

Indicates number of service bays or number of fueling
islands/fuel pumps, if applicable.

Section 3.0, Site Description
Describes project area and surrounding planning areas in sufficient detail to allow project location to be plotted on a base map.

Provides site address and site size to nearest tenth acre.

Identifies the zoning or land use designation.

Identifies soil types and the quantity and percentage of pervious and impervious surface for pre-project and project conditions.

Describes pre-project site drainage and how it ties into drainage of surrounding or adjacent areas and describes how planned project drainage and how it will tie into drainage of surrounding or adjacent areas.

Disneyland Resort Master WQMP     Appendix 3‐E
December 2014  Page 5 of 7  WQMP Checklist

WQMP REQUIREMENT
Requirement
Satisfied?
Yes No N/A
Identifies the watershed in which the project is located and the :
 downstream receiving waters
 known water quality impairments as included in the 303(d) List  applicable Total Maximum Daily Loads (TMDLs)

Identifies known Environmentally Sensitive Areas (ESAs) and Areas of Special Biological Significance (ASBSs) within the vicinity and their proximity to the project.

Section 4.0, Best Management Practices
Includes applicable performance criteria for the following: LID criteria, and treatment control BMPs.

Includes narrative describing how site design concepts were considered and incorporated into project plans.

Lists and describes all Routine Source Control BMPs (Non-structural and Structural).

Describes the implementation frequency and identifies the entity or party responsible for implementation of each Non-Structural BMP.

If applicable Routine Source Control BMPs were not included, was a reasonable explanation provided?
For Routine Non-Structural BMPs N1 (Education for Property Owners, Tenants, and Occupants) and N12 (Employee Training), describes the concepts that will be addressed by the education and training. List of standard educational materials that will be used provided and references to Orange County Watershed websites included. Copies of any educational materials not on the website included in an Attachment to the WQMP.

Lists and describes appropriate LID and Hydromodification BMPs and identifies the design basis (SQDF or SQDV) for the LID BMPs.

Describes any sub-watershed BMPs that will be utilized.

If utilizing the Resort BMP Exchange, provides basis for eligibility to participate in the Exchange.

Describes any activity related to the BMP Exchange
Section 5.0, Inspection and Maintenance Responsibility for BMPs Identifies the entity (or entities) responsible for the long-term inspection and maintenance of all structural source control BMPs and all LID or Treatment Control BMPs, including name, title, company, address, and phone number.

Disneyland Resort Master WQMP     Appendix 3‐E
December 2014  Page 6 of 7  WQMP Checklist

WQMP REQUIREMENT
Requirement
Satisfied?
Yes No N/A
Describes the minimum frequency for inspection and maintenance to ensure the effectiveness of each structural source control BMP and each LID/Treatment Control BMP.

Is an appropriate mechanism for the long-term operation and maintenance, including funding, in place?
Section 6.0, Location Map and Plot Plan
Has an 24” by 36” BMP Exhibit/Site Plan been included?
Do all figures, maps, plot plans, etc. have a legend, including a North arrow and scale?
Are all facilities labeled for the intended function?
Are all areas of outdoor activity labeled?
Are all structural BMPs indicated?
Is drainage flow information, including general surface flow lines, concrete or other surface ditches or channels, as well as storm drain facilities such as catch basins and underground storm drain pipes depicted?

Depicts where and how on-site drainage ties into the off-site drainage system.

WQMP REVIEW SUMMARY
The following is a summary of major concerns relative to this WQMP submittal:

Disneyland Resort Master WQMP     Appendix 3‐E
December 2014  Page 7 of 7  WQMP Checklist
Water Quality Management Plan
Project BMP Close-Out Form
Disneyland Resort Master WQMP   Appendix 3‐E
December 2014  Page 1 of 1
Project Name:

WQMP No.: Date of Issuance of Occupancy:

Project BMPs inspected by:
(WDI Inspector)
1: The following LID and/or Treatment Control BMPs have been constructed as part of this project:

(Photos Attached)
2: Does the project provide “Alternative BMPs” that includes a surplus to the Resort’s BMP Exchange as specified in the approved project WQMP? Yes No NA If yes, indicate type and area (SF) of treatment credit provided:

Treatment Type Credit Area (Square Feet)
Parking or Street
Other (describe):
3: Did the project require the use of surplus BMPs from the Resort BMP “Exchange” as stated in the approved project WQMP?
Yes No NA
If yes, indicate type and area (SF) of treatment credit used:

Treatment Type Credit Area (Square Feet)
Parking or Street
Other (describe):

Project BMP Close-Out Instructions
Upon receipt of Certificate of Occupancy by the City of Anaheim, the WDI Project Manager shall complete items 1 through 3 and forward to Environmental Affairs with BMP photos and any other relevant project documentation.

Environmental Affairs will review this Project Close-Out Form and update the Master WQMP Project Tracking Sheet to incorporate the subject project.

Attachment : Project photos
Disneyland Resort Master WQMP
Section 3: Post Construction BMP Methodology
LaRoc Environmental December 2014 – Final
Appendix 3‐F
Disneyland Resort SWPPP

The Disneyland® Resort
NPDES Storm Water
Pollution Prevention Plan
(SWPPP)
Revision 09
July 2014
ENVIRONMENTAL POLICY/PROCEDURE
(Water)
Doc #: SWPPP – R09
ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE i
Table of Contents

1. Introduction ______________________________________________________ 1

1.1 Regulatory Background _________________________________________________________ 1

1.2 Objectives ____________________________________________________________________ 2

1.3 Planning and Organization _______________________________________________________ 2

1.3.1 Other Requirements and Existing Facility Plans___________________________________ 2

1.3.2 Pollution Prevention Team___________________________________________________ 3

2. Site Description and Potential Pollutant Sources _________________________ 4

2.1 Site Map _____________________________________________________________________ 4

2.2 General Identification of Activities and Areas which are Potential Pollutant Sources _________ 7

2.3 Assessment of Potential Pollutant Sources __________________________________________ 7

2.4       List of Significant Materials_______________________________________________________ 7

2.5 General Description of Potential Sources ___________________________________________ 8

2.5.1 Operations _______________________________________________________________ 8

2.5.2 Material Handling and Storage Areas __________________________________________ 8

2.5.3 Dust and Particulate Generating Activities ______________________________________ 8

2.5.4 Significant Spills and Leaks ___________________________________________________ 9

2.5.5 Non‐Storm Water Discharges_________________________________________________ 9

2.5.6 Soil Erosion _______________________________________________________________ 9

3. General Resort Storm Water Best Management Practices ________________ 10

3.1 General Resort‐wide BMPs______________________________________________________ 10

3.1.1 Non‐Structural BMPs ______________________________________________________ 10

3.1.2 Structural BMPs __________________________________________________________ 11

3.2 Inspection Program and Preventive Maintenance ___________________________________ 12

3.3 Spill Response________________________________________________________________ 12

3.4 Material Handling and Storage Areas _____________________________________________ 13

3.5 Cast Member Training _________________________________________________________ 13

3.6 Waste and Recycling Handling, Collection, and Disposal Activities_______________________ 14

3.7 Erosion Control and Site Stabilization _____________________________________________ 14

3.8 Recordkeeping and Internal Reporting ____________________________________________ 15

3.9 Quality Assurance_____________________________________________________________ 15

3.10 Annual Comprehensive Site Compliance Evaluation __________________________________ 15

4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices _________________________________________________ 17

4.1 Facilities Maintenance Group: Horticulture – Landscaping Maintenance and Activities, Pesticide/Fertilizer Application ________________________________________________________ 17

4.2 Facilities Development and Reliability Engineering Group: Transportation Services – Vehicle Maintenance, Fueling, Vehicle Parts Cleaning _____________________________________________ 19

4.3 Facilities Development and Reliability Engineering Group: Environmental Activities Center – Consolidating and Storing Material _____________________________________________________ 20

4.4 Facilities Development and Reliability Engineering Group: Project Management – Construction Activities __________________________________________________________________________ 21

4.5 Facilities Engineering Support Services: Mill Shop – Wood Working Activities _____________ 26 ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE ii

4.6 Facilities Engineering Support Services: Staff Shop – Attraction Figure/Prop Refurbishing Activities __________________________________________________________________________ 27

4.7 Facilities Engineering Support Services: Sign Shop – Sign Production Activities_____________ 28

4.8 Facilities Engineering Support Services: Cycle Shop – Repair and Maintenance of Attraction Vehicles___________________________________________________________________________ 29

4.9 Facilities Engineering Support Services: Paint Shop – Painting Activities __________________ 30

4.10 Facilities Reliability Maintenance Team, Restaurant and Retail Team – Maintenance and Repair of Equipment/Structures in Restaurant and Retail Establishments ____________________________ 31

4.11 Building 500 (Welding, Machine, and Sheet Metal Shops) – Mechanical and Overhaul of Attraction Vehicles __________________________________________________________________ 32

5. Park Operations Potential Pollutant Sources and Best Management Practices 33

5.1 Custodial – General – Spills from Guests/Contractors/Cast Members, Trash Liner Washing___ 33

5.2 Custodial – Park Washdown – Spills from Contractors/Cast, Use of Scrubbers/Sweepers ____ 34

5.3 Custodial – Restaurant/Kitchen Cleaning___________________________________________ 35

5.4 Custodial – Fireworks Cleanup ___________________________________________________ 36

5.5 Custodial – Tram Washing ______________________________________________________ 37

5.6 Custodial – Indoor Area Cleaning Activities _________________________________________ 38

5.7 Circle D Ranch – Animal Confinement Area, Animal Bathing ___________________________ 39

6. Entertainment Potential Pollutant Sources and Best Management Practices _ 40

6.1 Parade Services – Parade Float Maintenance Activities _______________________________ 40

7. Food and Beverage Potential Pollutant Sources and Best Management Practices __________________________________________________________________________________41

7.1 Outdoor Vending – On Stage Vending Activities _____________________________________ 41

7.2 Outdoor Vending – Back of House Vending Preparation and Cart Cleaning________________ 42

7.3 Restaurants – Restaurant Cooking and Serving Activities ______________________________ 43

8. Additional Programs and Best Management Practices ___________________ 44

8.1 Post‐Construction Treatment BMPs_______________________________________________ 44

8.2 Adopt‐A‐Channel Program ______________________________________________________ 47

8.3 Non‐Storm Water Diversion to Sanitary Sewer ______________________________________ 49

9. Glossary/Definitions_______________________________________________ 50 Figures
Figure 2‐1: Disneyland Map_______________________________________________ 5 Figure 2‐2: Disney California Adventure Map_________________________________ 6 Appendices
Appendix A: Identification of Illicit Connections Report Appendix B:  Significant Spills and Leaks Report
ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 1

1. Introduction
This Storm Water Pollution Prevention Plan (SWPPP) has been developed for Disneyland Resort (Resort) located in the City of Anaheim (City), California.   The Disneyland Resort includes: two theme parks  ‐ Disneyland and Disney California Adventure (DCA); three hotels ‐ Disneyland Hotel, Disney’s Paradise Pier Hotel, and Disney’s Grand Californian Hotel & Spa; and Downtown Disney, which is a retail, dining, and entertainment district.  The purpose of this SWPPP is to assist Disneyland Resort in meeting specific state and federal regulatory requirements by reducing storm water pollution to the maximum extent practicable (MEP).   The SWPPP is also intended to be a tool to educate Disneyland Resort staff (Cast Members) about storm water pollution, how and where it occurs at the Resort, and about methods and practices known as Best Management Practices (BMPs) to prevent or reduce pollution at the source, before it enters the storm water drainage system.

Disneyland Resort has been a leader in environmental awareness and protection for many years.  This SWPPP is intended to complement and enhance other existing environmental pollution prevention regulatory programs such as the Spill Prevention, Control, and Countermeasure (SPCC) Plan and the Hazardous Material Release Response (HMRR) Plan.

The SWPPP is a document that shall be retained on site.  It is available to the public under Section 308(b) of the Federal Clean Water Act (Clean Water Act) and is to be made available upon request to representatives of the California State Water Resources Control Board (SWRCB) and Regional Water Quality Control Board (RWQCB).

This introductory section is intended to provide the regulatory background that sets forth the need for a SWPPP.  This section also includes a discussion of the objectives upon which the SWPPP is based.

1.1 Regulatory Background
Both the state and federal governments have determined that storm water runoff is a significant source of water pollution in creeks, rivers and other water bodies in California.  The United States Environmental Protection Agency (EPA) and the SWRCB regulate storm water runoff from municipalities, construction sites, and industrial facilities as a first step towards reducing this source of pollution.  The regulations may require facilities such as the Resort to obtain a permit to discharge storm water runoff.  The permit sets conditions for acceptable discharges of storm water runoff from the permittee's facility.   Although support properties (e.g., parking lots) are not required to obtain a storm water discharge permit, the SWPPP designates these locations with BMPs designed to ensure that storm water pollution is reduced to the MEP.

The Clean Water Act prohibits certain discharges of storm water containing pollutants except in compliance with a National Pollutant Discharge Elimination System (NPDES) permit [33 U.S.C. §§ 1311, 1342 (also referred to as Clean Water Act §§ 301, 402)].   The EPA promulgates federal regulations to implement the Clean Water Act’s mandate to control pollutants in storm water discharges (40 C.F.R. § 122, et seq.).  The NPDES permit must require implementation of Best Available Technology Economically Achievable and Best Conventional Pollutant Control Technology, collectively known as Best Management Practices or BMPs, to reduce or prevent pollutants in storm water discharges and authorized non‐storm water discharges to the MEP.  The NPDES permit must also include additional requirements necessary to implement applicable water quality objectives or water quality standards (water quality standards, collectively).

On November 16, 1990, the EPA promulgated Phase I of the storm water regulations in compliance with section 402(p) of the Clean Water Act (55 Fed. Reg. 47990, codified at 40 C.F.R. § 122.26).   These ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 2
regulations require operators of facilities subject to storm water permitting, i.e. those that discharge storm water associated with industrial activity (industrial storm water discharges), to obtain an NPDES permit.  Section 402(p)(3)(A) of the Clean Water Act also requires that permits for discharges associated with industrial activity include requirements necessary to meet water quality standards.  The SWRCB has been delegated authority by the EPA to administer the NPDES permit program in California.   The discharge of storm water runoff from the Resort is currently regulated by NPDES Permit No. CA0106283 (Permit) adopted by the Santa Ana RWQCB as Board Order No. R8‐2008‐0001, on January 18, 2008, which replaced Order No. R8‐2003‐0001 (issued January 17, 2003).  The Permit was issued pursuant to section 402 of the Clean Water Act.  This SWPPP has been prepared to comply with the conditions of Attachment I of the Resort’s NPDES Permit (Order No. R8‐2008‐0001).

1.2 Objectives
The objectives of this SWPPP are: (1) to identify and evaluate sources of pollutants associated with industrial activities that may affect the quality of storm water discharges and authorized non‐storm water discharges from the facility; and (2) to identify and implement site‐specific BMPs to reduce or prevent pollutants associated with industrial activities in storm water discharges and authorized non‐storm water discharges to the MEP.

This SWPPP is intended to outline methods to reduce the impact of industrial activities on storm water runoff.  Disneyland Resort is a unique industrial facility.  Many practices that protect storm water runoff quality have been in place at the Resort since long before the storm water regulations were published.  A large number of maintenance activities, good housekeeping practices, and employee‐training programs existed prior to the introduction of the regulations and the Resort’s Permit because they are consistent with the Resort's standard business practices and environmental stewardship goals.

Minimizing storm water pollution is accomplished by educating Cast Members and maintaining good housekeeping practices and storm water management facilities at the site.

1.3 Planning and Organization

1.3.1 Other Requirements and Existing Facility Plans
This document is intended to build upon existing, effective practices and programs rather than invent a separate program.  Documents such as the Resort’s SPCC and HMRR Plans have therefore been used as references for this SWPPP.  These plans, as well as the preventive maintenance procedures and extensive interviews with key facility employees, served as the basis for much of the storm water pollution control practices and BMPs included in this SWPPP.

As stated in Attachment I of the Permit, “The SWPPP requirements are designed to be sufficiently flexible to meet the various needs of the facility.   SWPPP requirements that are not applicable to the facility should not be included in the SWPPP.”  This SWPPP is therefore organized to assure it not only meets the requirements of the Permit, but that it also serves as a useful tool to implement BMPs.

In addition to summarizing the BMPs implemented generally throughout the Disneyland Resort, this SWPPP also includes a separate section dedicated to each of the four major departments identified as potential pollutant sources.   This separation allows for specific management and training of Cast Members within each department regarding the sources of pollutants and the site‐specific BMPs applicable to their duties.  Management from each of these departments worked in partnership with the Environmental Affairs Department to develop and update each section.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 3

1.3.2 Pollution Prevention Team
As required by the Permit, facility personnel responsible for developing, implementing, and revising the SWPPP are identified below.

Environmental Affairs
Ms. Janina Jarvis, CPSWQ No. 0864, QSD/QSP No. 23503
Manager – Environmental Compliance
Tel. #: 714.781.3563
Email: [email protected]
Mr. Carlos Campos
Environmental Engineer, Water Compliance
Tel. #: 714.781.1758
Email: [email protected]
Facility personnel responsible for assisting with SWPPP implementation for each department identified as managing activities or areas of potential pollutant sources are as follows:

Facilities and Operations Services
Mr. David Brunelle
Manager – Engineering Services
Mr. Charles Lenz
Manager – Engineering Services
Mr. Lawrence Vieira
Manager – Hotel Engineering Services
Mr. David Garza
Manager – Horticulture
Mr. John Schrimsher
Manager – Horticulture
Park Operations
Mr. Michael Sweeney
Operations Manager – Custodial Guest Services
Ms. Mary Cobb
Operations Manager – Custodial Guest Services
Ms. Jean Nicassio
Manager – Downtown Disney Initiatives & Business Relations Entertainment
Mr. Kevin Kelley
Manager – Entertainment Design & Production
Food and Beverage
Mr. Mark Taul
Operations Manager – Food & Beverage
ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 4

2. Site Description and Potential Pollutant Sources
Disneyland Resort is located at 1313 Harbor Boulevard, Anaheim, California.  The Resort covers an area of approximately 170 acres.   The "On Stage" portion of Disneyland Resort is comprised of theme park attractions, rides, restaurants, shops, and three hotels.   The “Back of House” portion of the Resort includes operation and maintenance support facilities, warehousing and storage, waste management, and material and equipment delivery.

2.1 Site Map
Figure 2‐1 provides an overview map of Disneyland’s On Stage and Back of House areas, the storm drain system, flow direction, and major structures (e.g., catch basin inlets, manholes).   Similarly, Figure 2‐2 provides an overview of Disney California Adventure and its corresponding On Stage and Back of House areas and storm drain system features.

Storm water runoff from the Resort’s On Stage area flows to nine different discharge locations.  These discharge locations are designated as M‐001, M‐002, M‐003, M‐005, M‐5D, M‐5E, M‐6C, M‐22B, and M‐ 34A.  Storm water from the west, south, and north central portions of Disneyland flows to M‐001.  Flow from the northern area discharges at M‐002, and flow from the eastern side of Disneyland discharges at M‐003.   Storm water from the Disneyland Hotel discharges at M‐005.   Drainage from Finding Nemo Submarine Voyage – during rehab only – flows to M‐03A.  Storm water from a portion of Paradise Pier Lagoon at DCA flows to M‐5D, M‐5E, and M‐6C.  Flow from the northern portion of DCA also discharges at M‐6C.  Storm water from the northern and north‐central areas of DCA, Downtown Disney, and Disney’s Grand Californian Hotel & Spa discharges at M‐22B.   Flow from the majority of DCA, including the northeast and southeast potions, discharges at M‐34A.  Runoff from the north central and west central areas of Disneyland flows into the recirculating water system which flows to M‐001.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 5 Figure 2‐1: Disneyland Map ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 6 Figure 2‐2: Disney California Adventure Map ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 7

2.2 General Identification of Activities and Areas which are Potential Pollutant Sources
Disneyland Resort owns and operates two theme parks consisting of a number of attractions, including mechanical rides, amusement devices, live entertainment, refreshment stands, and other food services.

Ornamental water systems are an integral part of a number of the attractions.  The Disneyland Resort owns and operates three hotels – Disneyland Hotel, Paradise Pier Hotel, and Disney's Grand Californian Hotel & Spa – and manages Downtown Disney, which is a retail, dining, and entertainment district.

The Resort is classified under SIC 7996 Amusement Parks, which covers theme parks, kiddie parks, amusement piers, centers, and parks, and other establishments (excluding fairs, circuses, and carnivals) that operate in part or whole such attractions as mechanical rides, amusement devices, refreshment stands, and picnic grounds.

Although activities at the Resort do not fall under manufacturing or treatment, as is the case with industrial facilities, numerous chemical products are used to maintain attractions and the facility on a routine basis.

2.3 Assessment of Potential Pollutant Sources
The Resort has developed a process to identify activities and areas that have the potential to generate or may be sources of pollutants that may enter the storm drain system. The following sections provide an overview of the assessment of potential pollutant sources, departments/areas, and activities. This document is organized to facilitate implementation of BMPs by pollutant, pollutant sources/activities and departments.  Detailed procedures and BMPs for each potential source by department are included in the tables in Sections 4 through 7 – Potential Pollutant Sources and Best Management Practices.  The tables include the specific BMPs that apply to each of six important BMP groups: materials handling and storage, housekeeping and other best management practices, spill prevention and response, employee training, waste recycling/disposal procedures, and record keeping, internal reporting, inspection and quality control.

2.4 List of Significant Materials
The Disneyland Resort submitted a list of all chemicals along with their Material Safety Data Sheets (MSDS) to the RWQCB on August 25, 2003. The list of potential pollutant categories or operations has been identified from the list of specific products and chemicals used at the Resort and are (in alphabetical order) as follows:
 Acids (dilute and batteries)
 Ammonia
 Bleach
 Cleaning solvents (degreasers)
 Detergents
 Dirt/debris
 Fertilizers
 Food particles, wastes, materials
 Fuels
 Glues, adhesives, resins, fillers
 Gun powder
 Hazardous materials
 Inks
 Lubricants
 Manure
 Metals
 Non‐hazardous waste
 Oil (petroleum, cooking, etc.)
 Paper, paper ash
 Paints (water‐based, oil‐based, glazes)
 Paving operations
 Plaster, cement, putty
 Polishes
 Propane
 Regulated wastes
 Sawdust
ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 8
 Sediments, soil
 Solvents (Thinner, fixers, developers)
 Structure construction (painting and
roof work)
 Urethane and polyvinyl (products and
materials)
 Vehicle and equipment fueling
 Vehicle and equipment cleaning
 Waste lubricants
These pollutant categories or activities are included as part of the tables in Sections 4 through 7 and support the selection and implementation of BMPs.

2.5 General Description of Potential Sources

2.5.1 Operations
Disneyland Resort’s Environmental Affairs Department (Environmental Affairs) performed a thorough review of each of the operational activities and areas (in lieu of industrial processes as they are more indicative of Resort’s function) that could be potential pollutant sources to storm water as a part of the preparation and subsequent revisions of this SWPPP.  The following departments at Disneyland Resort were identified as managing activities or areas of potential pollutant sources:
 Facilities and Operations Services
 Park Operations
 Entertainment
 Food and Beverage
As noted above, this SWPPP includes a separate section dedicated to each of these four major departments identified as a part of the review.  This allows for specific management and training of Cast Members within each department regarding the sources of pollutants and the site‐specific BMPs.

Management from each of these departments worked in partnership with Environmental Affairs to develop each section.

Refer to Sections 4 through 7 for specific potential sources and activities.

2.5.2 Material Handling and Storage Areas
The Resort operates a central receiving area for all material handling and deliveries. Centralized receiving allows for better management of all materials and personnel handling the materials.  Materials are stored in buildings or under cover and on impervious surfaces where practical prior to distribution to minimize exposure to storm water.   Larger deliveries are transported to their final locations for storage when staging at the receiving facility is limited.  Detailed procedures for handling and storage are included in Sections 4 through 7 – Potential Pollutant Sources and Best Management Practices as they apply for each of the departments.

2.5.3 Dust and Particulate Generating Activities
Dust and particulate generating activities are minimal, dispersed and typically associated with other types of activities or operations at the Resort. As such these activities are generally considered with the primary operation when it comes to addressing the pollutants they may generate and the BMPs selected may specifically target all pollutants from the activity to maximize effectiveness.

In general, the unpaved portion of the Disneyland Resort is landscaped with grass, flowers, trees and shrubs.   Because these unpaved areas are landscaped with vegetation, soil erosion is negligible and ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 9
sediment does not have a potential to pollute storm water.  However, fertilizers and pesticides are used on this vegetation and these chemicals do pose a risk of polluting storm water.

The paved areas are used primarily as walkways for the thousands of people that visit Disneyland Resort every day.  Debris left by guests, such as food particles, soft drink liquids, shoe leather, and rubber, along with dust and debris (e.g., green litter, trash, and dirt and debris) accumulate on the paved walkway surface and have the potential to be released in storm water runoff.

2.5.4 Significant Spills and Leaks
Significant spills and leaks may only originate at very specific locations throughout the Resort and potentially originate from storage of larger quantities of materials or wastes. As noted earlier, the Resort’s central receiving area is one location for materials that could lead to spills and leaks. Another possible source is the Environmental Activity Center (EAC) where solid, liquid and hazardous wastes are managed and stored until they are transferred for final disposal. Centralized receiving allows for better management of all materials and personnel handling the materials. Spills may also take place from the sanitary sewer system. Spill response and management is conducted in accordance with the Resort’s SPPC Plan with BMPs specified to minimize storm water system discharges.

The Maintenance Response Team is contacted for larger spills.  Detailed procedures for spill prevention and response are included in Sections 4 through 7 – Potential Pollutant Sources and Best Management Practices.

2.5.5 Non‐Storm Water Discharges
Disneyland Resort’s Permit states, “The discharger shall investigate the facility to identify all non‐storm water discharges and their sources.” Non‐storm water discharges may occur at the Resort from a variety of sources and locations as identified in Sections 4 through 7. Non‐storm water discharges, if they occur, are unlikely to include hazardous materials or wastes as those are specifically stored and handled in accordance with the Resort’s HHMR and SPPC Plans with BMPs specified that have a positive impact on storm water and non‐storm water discharges.

The elimination of non‐storm water discharges is a major element of the SWPPP.   Non‐storm water discharges can include illicit connections (e.g., floor drains connected to storm drains), improper dumping, spills, and leakage from storage tanks or transfer areas.   Improved management practices can often eliminate dumping, spills, and leakage and are in place throughout the Resort.

2.5.6 Soil Erosion
Landscape and hardscape improvements throughout the Disneyland Resort are used to reduce soil erosion and eliminate the potential for soil, sediment, or debris from entering the storm drain system.

Areas are developed to include trees, plants, and ground cover, incorporating the use of geotextile fabrics and mulch, controlled automated drip irrigation and containment curbs and berms which all work together to prevent the erosion of soil in On Stage and Back of House areas. Construction activities are a potential source of soil erosion and sediment discharge.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 10

3. General Resort Storm Water Best Management Practices Disneyland Resort implements many practices to protect storm water quality.   This section documents these practices for new and existing employees as well as regulators who may review this SWPPP.

The Permit requires that the Disneyland Resort consider a variety of BMPs including non‐structural, good housekeeping, preventive maintenance, and spill response to address the identified potential sources listed in Section 2.  The Resort’s unique activities, management structure by departments, and sources make it more plausible to organize the BMPs as noted earlier and presented in Sections 4 through 7.

In general, BMPs are used to minimize pollutant exposure to rain water and storm water contamination.

BMPs may include a wide range of non‐structural practices from Cast Member training to facility inspections.   Structural BMPs may include permanent berms, storm water pollution interceptors, automatic storm water diversion valves, spill kits and absorbents, or additional treatment of roof runoff at the source (such as filters on roof downspouts).  Good housekeeping BMPs includes surface cleaning and maintenance, extensive sweeping (both manual and mechanical), trash and debris removal (both manual and mechanical), etc.   Methods of pollution control, or BMPs, currently being used at the Resort are described in the following sections for each of the operations departments previously identified and BMPs are included as noted early in six main groups (see Section 2.3). Specifically, Sections 4 through 7 list the sources of pollutants and the site‐specific BMPs by department.   Management from each of these departments worked in partnership with Environmental Affairs to develop each section. The sections provide a discussion of the pollution control measures common to all areas and also target the specific management and training needs of Cast Members within each department.

3.1 General Resort‐wide BMPs
Numerous BMPs currently implemented throughout the Disneyland Resort are not specific to a given operation.   These BMPs may have multiple benefits in reducing pollutants and pollutant sources. They have been adopted throughout the Resort and include the following:

3.1.1 Non‐Structural BMPs
Non‐Structural BMPs may include good housekeeping, materials and waste handling and storage practices, spill response, and other similar BMPs.
 The Custodial Guest Services Department sweeps all asphalt in Back of House area weekly or more frequently as needed and prior to the start of the rainy season with a regenerative air sweeper.  Trash is picked up along the exterior fence line around the property as needed.  Annually, the Disneyland Resort Infrastructure Department cleans all storm drain lines and catch basins prior to the first rain event of the season.
 Materials are distributed and stored in small quantities to minimize the risk of spills.  The Cast Members at the EAC implement a Resort‐wide waste management system.  Limiting the number of Cast Members handling hazardous materials minimizes the potential for spills.  All wastes are segregated by the shops into designated hazardous waste containers, recyclables and disposal containers.  These wastes are picked up by the EAC.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 11
 Materials inventory is closely controlled pursuant to Air Resources Control Board standards and material issuing areas are all indoors.  This control reduces the potential for spills.  All Back of House operations require Resort Cast Members to be responsible for the housekeeping of their own work areas.  These areas are cleaned at the end of each day.  Biodegradable cleansers and solvents are used for cleaning activities whenever possible.  The majority of coatings used in painting operations are water base.  All are lead‐free paint.  Most materials are stored indoors, minimizing the potential for contact with storm water.  Absorbent material is available throughout the Back of House area and is stored in close proximity to operations with potential to threaten storm water.  The Back of House area is enclosed by a security fence and patrolled by security personnel 24 hours a day to control unauthorized activity that could lead to environmental contamination.

3.1.2 Structural BMPs
 Overhead Coverage – Products are delivered through a centralized receiving department for distribution throughout the Disneyland Resort.  Materials are stored under cover where practical.

Each line of business has designated storage facilities for new and used product storage.  Storage lockers, covered outdoor storage, the use of spill containment pallets, temporary covers (canopies and polyethylene sheeting pallet covers), and offsite warehousing are utilized as needed.
 Retention Ponds – StormChamber® devices in select areas treat and infiltrate runoff from impervious areas, including roofs and Back of House roadways.   This technology is a subterranean, open bottom, high‐density polyethylene infiltration chamber, which functions in both permeable and non‐permeable soils and takes advantage of the natural infiltration and treatment process of the underlying soil.

Storm water runoff from impervious surface is treated by infiltration basins onsite.   As water migrates through porous soil and rock, pollutant attenuation mechanisms, including precipitation, sorption, physical filtration, and bacterial degradation are at work.  This design has high removal efficiencies for particulate pollutants and moderate removal of soluble pollutants.  Control Devices – Berms, curbs, and diversionary devices have been designed and constructed in such a way to prevent potential run‐on and runoff of storm water in areas that could cause an increase in pollutant loading in storm water.  Other control devices include oil/water separators, automatic diversion valves that redirect the first flush of areas such as wash pads, trash compactors, and sorting and recycling locations, and the use of pretreatment inline filters to remove solids, metals, and oil and grease from storm water runoff.  Secondary Containment Structures – Spill containment structures or devices have been installed under product containers, equipment and machinery, and storage lockers and equipment rooms per the requirements of the SWPPP and SPCC Plan.   These structures or devices are routinely inspected and maintained as needed.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 12
 Treatment – Several BMP technologies have been incorporated into remodels of existing infrastructure and redevelopment projects throughout the Disneyland Resort to treat roofed, paved and landscaped areas.   For many roofed areas, FloGard® downspout filters have been installed to pre‐treat runoff.   The downspout filters are designed to treat oil, grease and sediment in the roof runoff before it enters an infiltration unit that allows for water capture and groundwater recharge.   In many areas, the pre‐treated roof runoff is discharged to secondary treatment/infiltration devices to recharge the groundwater table.   Infiltration pits are located under walkways undetectable to guests visiting the Disneyland Resort.

Stormceptor® systems are also utilized as an effective, tested and proven storm water management solution for new and existing facilities.   The treatment system slows incoming storm water to create a non‐turbulent treatment environment, allowing debris to rise and sediment to settle.   Also, the system can maintain continuous positive treatment of total suspended solids, regardless of the flow rate, treating a wide range of particle sizes as well as free oils, heavy metals and nutrients attached to fine sediments.

Other storm water treatment BMPs implemented since 2012 include vegetated swales (biotreatment units), downspout filters for treating roof runoff, vortex separators, eight acres of porous pavement, 15 infiltration basins, several trenches and dry wells, and numerous storm drain filtration inserts.   The BMPs are being effectively managed and maintained by the Disneyland Resort Environmental Affairs team, which ensures that all BMPs are serviced on a regular basis.  The regular maintenance ensures that all devices are performing at their highest efficiency.

3.2 Inspection Program and Preventive Maintenance
A comprehensive inspection and preventive maintenance program is implemented for non‐structural and structural BMPs at the Resort. Routine inspections are planned, scheduled and completed to minimize the non‐storm water discharges, identify Cast Member training needs, document potential for spills or leaks due to equipment failures and routine operations, and track any failing or deficient BMPs.  Disneyland Resort has an extensive ongoing preventive maintenance program at the facility.  The program includes a history of inspection records and blank inspection forms to be completed by Cast Members during inspections.

Routine inspection of the Resort’s potential sites for non‐storm water discharges take place as part of environmental auditing practices and are scheduled quarterly as department self‐audits. These inspections are designed to identify any potential or existing non‐storm water discharges and initiate corrective actions.

A thorough investigation of the storm drain system serving Disneyland Resort Back of House areas is performed annually for the purpose of identifying any illicit connections which would be documented using the table template included in Appendix A. Environmental Affairs performs annual audits of the facility to verify compliance with environmental regulations (including storm water).

3.3 Spill Response
Cast Members receive hazardous material communication and hazardous waste handling training.

Environmental Affairs coordinates with all departments annually to inform appropriate Cast Members at all levels of their responsibilities as outlined in the SWPPP as well as general storm water requirements that prohibit the discharge of any wastes to the storm drain system.  Spill kits are located throughout the Disneyland Resort where the potential exists for accidents and Cast Members are trained to clean up spills immediately and dispose of materials properly.  Storm drain inlets are protected from spills and clearly ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 13
marked, as needed.  The Maintenance Response Team is contacted for larger spills.  Detailed procedures for spill prevention and response to non‐storm water discharges that may occur at the Resort from   a variety of sources and locations are identified in Sections 4 through 7. Non‐storm water discharges, if they occur, are unlikely to include hazardous materials or wastes as those are specifically stored and handled in accordance with the Resort’s HHMR and SPPC Plans with BMPs specified that have a positive impact on storm water and non‐storm water discharges. Significant spills and leaks are documented using the table template included in Appendix B.

3.4 Material Handling and Storage Areas
The Resort operates a central receiving area for all materials handling and deliveries.  Materials are stored in buildings or under cover and on impervious surfaces where practical prior to distribution.   Larger deliveries are transported to their final locations for storage when staging at the receiving facility is limited.  Materials are purchased and/or transported in the minimal quantities possible to minimize the potential for spills. Spills are cleaned up immediately and disposed of properly.  Detailed procedures for handling and storage are included in Sections 4 through 7 – Potential Pollutant Sources and Best Management Practices as they apply for each of the departments.

3.5 Cast Member Training
Disney Development Connection (a department within Disneyland Resort) and Environmental Affairs are responsible for implementing various training courses.  Cast Member training guidelines are extensive.  A section of training focuses on spill prevention and therefore relates closely to storm water pollution prevention.

Roll Call meetings are held daily to discuss safety and operational issues, procedural updates and guest satisfaction guidelines.   Throughout the month, a portion of the agenda is devoted to storm water pollution prevention and BMPs.   This informal setting is used to communicate immediate needs to support the program, provide feedback to sustain the overall success of the program through team support, and provide updates to practices that help improve the Disneyland Resort’s overall execution of the program.   SWPPP‐related communications are also provided to Cast Members through Team Talks (written communication), monthly environmental newsletters, brochures, and online computer based training.

Additional training is conducted with changes in facility procedures, or with the introduction of an MSDS for a new material at the facility.  Daily startup meetings address changes in procedures, issues that may arise, and operational improvements as needed.

Custodial Guest Services Department Cast Members are trained to distinguish between sanitary sewer and storm drains.  They are instructed in the drainage patterns of the storm drain system and understand that all materials must be prevented from entering the storm drain system.  A Back of House demarcation program installs and maintains signage at storm drain inlets and sanitary sewer locations.  Communication of BMPs is also made available to Cast Members in English and Spanish with pictorials of signage that allows quick identification through color coding as well as embossed lettering.

The extensive training of Cast Members at the Disneyland Resort has been instituted to disseminate information about the impacts of pollutants on storm water and methods of preventing pollutants from entering the storm water system.   The training program is presented to Cast Members and their supervisors who have duties and areas of responsibility that could impact storm water pollution (e.g., vehicle maintenance, materials handling, custodial, and general maintenance).  The program includes the following:

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 14
 Background Information – Cast Members are briefed on the regulations derived from the Clean Water Act and the rationale for requiring industries and municipalities to develop and implement a plan to reduce storm water pollution.   The term "storm water pollution" is defined and differences between sanitary and storm drain systems are explained.  Site Information – The facility site map is reviewed and the storm drain system, catch basins, sanitary sewer lines and drains, and drainage flow directions are indicated.  Pollution Prevention – Good housekeeping practices and materials management practices are described for various types of activities throughout the facility.  Significant materials used on site that could cause pollution to storm water are identified as well as areas with the greatest potential for spills to occur.
 Pollution Control – Cleanup procedures and methods for containing spills are discussed and then demonstrated.  Storm water pollution control measures throughout the facility are identified and maintenance procedures are introduced.
 Financial Liability – Cast Members are informed and alerted to the possible financial consequences which could be imposed upon Disneyland Resort for discharging significant pollutants to the storm drains.

3.6 Waste and Recycling Handling, Collection, and Disposal Activities Recycling, waste collection, and disposal activities are coordinated and managed at the EAC.  Recyclable materials collection, solid waste management, hazardous waste storage, hazardous materials storage, solvent recovery, and trash compacting operations are centrally located at the EAC.

Materials delivered to the EAC from throughout the Disneyland Resort are sorted into designated dumpsters for recycling.  These materials include garden waste, kitchen waste, construction waste, etc.

Hazardous materials, such as solvents and paints, are contained in designated drums to be picked up by a hazardous waste hauler.  All of these materials are securely stored to prevent storm water contact and runoff. Only highly trained and qualified Cast Members operate the EAC.

3.7 Erosion Control and Site Stabilization
The Disneyland Resort is not generally subject to sediment erosion during routine operations. Sediment erosion during construction activities is managed through the implementation of construction BMPs and the implementation of a project specific SWPPP as specified by the State’s Construction General Permit (Order No. 2009‐0009‐DWQ; CAS000002), as applicable.

Landscape and hardscape improvements throughout the Disneyland Resort are used to reduce soil erosion and eliminate the potential for soil, sediment, or debris from entering the storm drain system.

Areas are developed to include trees, plants, and ground cover, incorporating the use of geotextile fabrics and mulch, controlled automated drip irrigation and containment curbs and berms which all work together to prevent the erosion of soil in On Stage and Back of House areas.

The paved areas are used primarily as walkways, driveways, and parking were extensive sweeping and trash pick‐up is used to reduce pollutants.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 15

3.8 Recordkeeping and Internal Reporting
The Resort maintains extensive recordkeeping for all the environmental programs it implements, including the storm water program. Databases and systems are used to track inspections, maintenance activities, spills, and action items for timely notification, reporting and effective data management.

Communications systems are also in place to support effective internal reporting and response. As appropriate, forms, and logs are maintained to support recordkeeping, internal and compliance reporting activities.

3.9 Quality Assurance
Quality assurance related to the implementation of this SWPPP and the described BMPs is in place and supported by the inspection and auditing system managed by the Environmental Affairs Department. Any deficiencies identified are corrected in a timely manner and adjustments to the SWPPP or BMPs are tracked for incorporation during the next planned revision. Disneyland Resort’s Environmental Affairs Department has dedicated fulltime Cast Members that perform daily process validation audits across the property in accordance with local, state and federal environmental requirements for programs that include hazardous waste, water quality, and air quality compliance.

Environmental auditing Cast Members perform site validation reviews Resort‐wide, develop and continuously improve the process validation program, report findings, track corrective actions, conduct trending analysis, and work closely with environmental program managers so they can effectively act as a liason to Environmental Affairs in the field as they interact with senior management and Cast Members on a daily basis.

3.10 Annual Comprehensive Site Compliance Evaluation
The tables in the following sections have been developed to document the specific BMPs implemented for each of the selected departments within Disneyland Resort as well as to serve as a useful tool for conducting the annual comprehensive site compliance evaluation.  Each table is used by the respective individual department on a regular basis throughout the year to assure compliance with the Permit.  In addition, an independent representative of the Environmental Affairs Department uses the tables to conduct an annual comprehensive site compliance evaluation at each department.

As a part of the annual evaluation, the Environmental Affairs Department reviews and evaluates each of the BMPs, both structural and non‐structural, to determine whether the BMPs are adequate, properly implemented, and maintained, or whether additional BMPs are needed.

In addition, the annual comprehensive site compliance evaluation, covering the reporting period of July 1 June 30, includes the following:

1. A review of all visual observation records, inspection records, and sampling and analysis results;

2. A visual inspection of all potential pollutant sources for evidence of, or the potential for, pollutants entering the storm drain system;

3. A review and evaluation of all BMPs (both structural and non‐structural) to determine whether the BMPs are adequate, properly implemented and maintained, or whether additional BMPs are needed; and

4. A visual inspection of equipment, such as spill response equipment, needed to implement the SWPPP.

The annual evaluation report includes:

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 16

1. Identification of the personnel performing the evaluation,

2. Date(s) of the evaluation,

3. Necessary SWPPP modifications,

4. Schedule for implementing any corrective actions,

5. Any incidences of non‐compliance and the corrective actions taken, and

6. Certification that the Disneyland Resort is in compliance with Order No. R8‐2008‐0001.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 17 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.1 Facilities Maintenance Group: Horticulture – Landscaping Maintenance and Activities, Pesticide/Fertilizer Application Significant
Materials/
Pollutant
Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Pesticides Top soil Dirt/debris
 All pesticides are
used by Landscapingare received "Back ofHouse" and only small quantities aretransported to the"On Stage" areawhen needed,already diluted andmixed.  Fueling cans are
stored in flammableliquid safety cabinetsand landscaping equipment is stored
under roof.
 Pesticides and
fertilizers are stored
in the pesticide
storage shed.
 Bulk top soil is stored
in designated areasand covered withplastic to preventerosion.  Soil is aerated
around trees ratherthan the applicationof ground saturation fungicides to preventfungus of the roots
 Pesticides are no
longer used in
Tomorrowland and
on all Eugenia plants
because a beneficial
insect has beenintroduced to controlplant pests.
 All fertilizers and
pesticides areapplied per label
instructions.
 Preventative
measures are used to
reduce theintroduction of solidsinto the storm drainsystem duringgeneral landscapingactivities.  Spills are cleaned up
immediately and
disposed of properly.

Storm drain inlets
are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Pesticide applicators
have been certified
with either Branch 2
Structural PestControl License orQualified ApplicatorsLicense by the State Dept. of PesticideRegulations.
 Pesticide applicators
obtain continuing
education creditsthrough seminars tomaintaincertification. Hoursare tracked by the State Dept. ofPesticideRegulations.
 Empty containers are
triple‐rinsed and
disposed of in the
EAC waste collection
site.
 All pesticide rinsate
is collected at adesignated rinsatestation.
 Green waste is
placed in appropriate
containers at
designated collectionstations.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures inthis table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliance
with the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 18 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.1 Facilities Maintenance Group: Horticulture – Landscaping Maintenance and Activities, Pesticide/Fertilizer Application Significant
Materials/
Pollutant
Sources
Materials Handling and
Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Fertilizers Dirt/debris
 All fertilizers used by
Landscaping are
received "Back ofHouse" and only
small quantities are
transported to the
"On Stage" area.
 All fertilizers are
stored in secured
sheds in the "Back of
House" area.
 Some slow‐ release
nitrogen type
fertilizers are used.These fertilizers donot readily dissolve in water.
 Probes are used near
trees and largeplants to apply
fertilizers under the
ground rather thanusing surface
saturation methods.
 Fertilizers are applied
after irrigation toprevent runoff.
 Fertilizers are applied
at the recommendedapplication rates,
and irrigation rates
are monitored to
assure compliancewith application rate.
 Spills are
immediately treated
with dry absorbentmaterials which areswept up and
transported toDisneyland's EAC.The affected area isthen washed and the wash water retrieved
by vacuum sweeper.
 Landscaping Cast
Members receivehazardous materialcommunication andhazardous wastehandling training.  Environmental Affairs
coordinates with
Horticulturemanagementannually to inform
appropriate CastMembers at all levelsof responsibility of the Resort’s SWPPPas well as generalstorm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Empty containers are
triple‐rinsed and
disposed of in the
EAC waste collection
site.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures in thistable.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliance
with the procedures
in this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 19 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.2 Facilities Development and Reliability Engineering Group: Transportation Services – Vehicle Maintenance, Fueling, Vehicle Parts Cleaning
Significant
Materials/
Pollutant
Sources
Materials
Handling and
Storage
Housekeeping and Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Lubricants Oil Solvents Fuels Cleaning solvents Dirt/debris  Products
(petroleum
products,chemicals, etc.)
are stored
under roof and
in imperviousareas.
 Outdoor steam cleaning
areas and indoor serviceareas drain to sanitary sewerthrough a clarifier.  Back of House washdown
seldom occurs. Sweeping ormopping is used as analternative. If Back of House washdown is conducted, all
wastewater is collected with
a scrubber and properly
disposed.
 Debris inside and outside the
facility is swept up and
properly disposed of in a
trash or recycling receptacle.
 Utility sinks, floor drains, and
oil/water clarifiers are
maintained and cleaned outregularly.
 USTs are inspected by a
Certified DesignatedOperator (DO) and recertifiedannually through the City of Anaheim Fire Department.
 Vehicle maintenance is done
under cover within service pitarea.
 All spills are cleaned
up immediately anddisposed of properly.

The MaintenanceResponse Team is
contacted for larger
spills.
 Fuel supply vehicles
are equipped withportablecontainment andabsorbent material.  Fuel loading and
transferring is
continuouslymonitored.
 Pressure washer is
used to washvehicles orequipment at adesignated wash
pad. Rinse water isdisposed to the
sanitary sewerthrough a clarifier.
 Cast Members
receive hazardous
material
communication and
hazardous wastehandling training.
 Environmental
Affairs coordinateswith Transportationmanagementannually to inform appropriate CastMembers at all levelsof responsibility of the Resort’s SWPPPas well as generalstorm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Waste oil is collected
in tram maintenancepit and servicegarage and thentransferred to wasteoil recycle tank.Waste oil is disposed of through the EAC.
 Waste tires are
recycled through theEAC.
 Used oil filters, fuel
filters, and oily rags
are disposed of at
the EAC.
 Designated
containers are used
to collect hazardous
wastes on‐site.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 20 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.3 Facilities Development and Reliability Engineering Group: Environmental Activities Center – Consolidating and Storing Material
Significant
Materials/
Pollutant
Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Hazardous materials Regulated wastes Non-hazardous waste  All materials are
stored under roofand on imperviousareas.
 Hazardous materials
are covered andcontained.
 Garbage is stored in
dumpsters whichdrain to sanitary
sewer.
 EAC is graded to
prevent storm water
run‐on from enteringthe area.
 The entire facility
drains to the sanitary
sewer during non‐rain events. It alsodischarges the firstflush from a rainevent to the sanitarysewer.  Washdown of this
facility occurs at afrequency to reducethe accumulation ofdust.  EAC is swept and
cleaned regularly.
 Sufficient waste
receptacles are
maintained by the
facility for proper
waste segregation.
 Spills are cleaned up
immediately with
appropriate response
material.
 Adequate spill
response supplies are
made available
onsite.
 Hazardous waste
containers are stored
in appropriatesecondarycontainment.
 Cast Members
receive hazardous
materialcommunication and
hazardous wastehandling training.
 Environmental
Affairs coordinates
with EACmanagementannually to inform
appropriate CastMembers at all levelsof responsibility of the Resort’s SWPPPas well as generalstorm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  The EAC is the
location where allwaste for the Park is
sorted and stored
prior to recycling orproper disposal.
 Waste is processed
and transported off‐site to certifieddisposal facilities inaccordance with hazardous wasteregulations.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures inthis table.
 Evaluation Reports
are maintained for
five years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 21 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.4 Facilities Development and Reliability Engineering Group: Project Management – Construction Activities Significant
Materials/
Pollutant
Sources
Materials Handling and
Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Paving Operations
 Cover catch basins
and manholes whenapplying seal coat,tack coat slurry seal, fog seal, etc.
 Store products on
impervious surfaceon containmentpallets, and undercover if practical prior to use.
 Vacuum saw cut
slurry and remove
from site. Coverstorm drains duringsaw cutting to
contain slurry.
 If paving involves
asphaltic concrete donot allow gravel
placed over new
asphalt to wash intostorm drains, orstreets. Properly
dispose of waste.
 Remove old asphalt
from the site anddispose of through arecycler if possible.  Avoid paving during
wet weather.
 Leaks and spills from
paving equipment
can contain toxiclevels of heavymetals and oil and
grease. Place drippans or absorbentmaterials under
paving equipmentwhen not in use.
 Fuel equipment in a
designatedimpervious area withcontainment aroundthe fuel tank.  Cast Members
receive hazardousmaterialcommunication andhazardous waste handling training.
 Environmental Affairs
coordinates withmanagementannually to inform
appropriate CastMembers at all levelsof responsibility of the Resort’s SWPPPas well as generalstorm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  The EAC is the
location where all
waste for the Park is
sorted and stored
prior to recycling orproper disposal.
 Empty drums are
stored prior tocollection by supplier.
 Designated bins for
concrete waste,
lumber, metals and
comingled waste are
staged for projectuse.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures in thistable.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive Site
ComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 22 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.4 Facilities Development and Reliability Engineering Group: Project Management – Construction Activities (Continued) Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
 Materials delivery: includes but is not
limited to soil,
plaster or plaster
products,petroleum products
such as fuel, oil,
grease, acids, lime,paints, glues,
solvents, and curing
compounds.
 Areas are
designated at theconstruction site formaterial delivery and storage. (Place
near constructionentrances, awayfrom Park
waterways, place in
paved area.)
 Store reactive,
ignitable orflammable liquidsin accordance with
fire codes. See the
Flammable and
Combustible LiquidCode, National Fire
ProtectionAssociation (NFPA)30.
 Do not store
chemicals, drums orbagged materials
directly on theground. Place
materials on apallet and covered.
 Where possible,
store chemicals,drums, or bagged
material with
secondarycontainment.
 Small spills are
wiped upimmediately withrags asappropriate. The
MaintenanceResponse Team
hazardous wasteteam cleans uplarger spills.
 Cast Members
receive hazardousmaterialcommunication andhazardous wastehandling training.  Environmental
Affairs coordinateswith management
annually to inform
appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  The EAC is the
location where allwaste for the Parkis sorted and storedprior to recycling or proper disposal.
 Empty drums are
stored prior tocollection bysupplier.
 Designated bins for
concrete waste,
lumber, metals and
comingled wasteare staged forproject use.
 Supervisors are
Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained for
five years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 23 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.4 Facilities Development and Reliability Engineering Group: Project Management – Construction Activities (Continued) Significant
Materials/
Pollutant
Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Vehicle and Equipment Fueling Fuels
 Areas are designated
at the constructionsite for materialdelivery and storage.(Place near constructionentrances, awayfrom Parkwaterways, place in paved area.)
 Store reactive,
ignitable orflammable liquids in
accordance with fire
codes. See theFlammable and
Combustible LiquidCode, NFPA 30.
 Store materials in
covered areas.
 Designated areas for
fueling located away
from drainage
courses to preventrun‐on of stormwater and the runoffof spills. Use only these areas.
 Do not “top‐off” fuel
tanks.
 Use secondary
containment, such asdrip pans, whenfueling to catchspill/leaks.  Spills are cleaned up
immediately anddisposed of properly.

Storm drain inlets
are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous wastehandling training.  Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at all levels
of responsibility of
the Resort’s SWPPPas well as generalstorm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  The EAC is the
location where allwaste for the Park issorted and storedprior to recycling or proper disposal.
 Empty drums are
stored prior tocollection bysupplier.
 Designated bins for
concrete waste,
lumber, metals and
comingled waste are
staged for projectuse.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures inthis table.
 Evaluation Reports
are maintained for
five years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 24 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.4 Facilities Development and Reliability Engineering Group: Project Management – Construction Activities (Continued) Significant
Materials/
Pollutant
Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Structure Construction: painting and roof work
 Properly store paints
and solvents in
designated areas.Do not store paints
outdoors uncovered.
 Do not leave open
buckets of paintingmaterials outdoorsor on the ground.
 See material deliver
and storage.
 Use temporary
scaffolding to hangdrop cloths or
draperies to prevent
drift.
 Use application
methods that
minimize overspray.
 Remove excess
materials (sealants,paints, solvents, etc.)immediately withabsorbent material,rags, or vacuums.  If painting requires
scraping or sandblasting of anexisting surface, usea drop cloth tocollect chips.Dispose of residueproperly andimmediately. Ifpaint contains lead it is a hazardous
waste, contact
EnvironmentalAffairs immediately.
 Spills are cleaned up
immediately anddisposed of properly.

Storm drain inlets
are protected fromspills. TheMaintenanceResponse Team is contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardous
materialcommunication and
hazardous wastehandling training.
 Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at all levelsof responsibility of
the Resort’s SWPPP
as well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Waste paint and
chemicals aretransported to the
EAC for storage and
disposal.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures inthis table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliance
with the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 25 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.4 Facilities Development and Reliability Engineering Group: Project Management –Construction Activities (Continued) Significant
Materials/
Pollutant
Sources
Materials Handling
and Storage
Housekeeping and Other
Best Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Waste lubricants Oil Solvents Sediments
 All materials are
stored indoors in
areas specifically
designed tocontain the totalcontents of all
containers.
 Project Manager shall
inspect the construction
site prior to anticipated
storm events and after anactual storm event toidentify areas contributingto a discharge of storm water associated withconstruction activity and
to evaluate if controlpractices designed toreduce pollutant loading are adequate and properly
implemented
 Protect storm drain inlets
by using one or more ofthe following measures:filter fabric fence, block and gravel filter, gravel
and wire mesh filter, sandbag barrier, excavated drip
inlet sediment trap.
 Store materials away from
drainage courses toprevent storm water run‐
on.
 Keep the work site clean
and orderly. Remove
debris at a minimum ofonce every 24 hours.

Sweep the area. Do not
washdown the area.
 Spills are cleaned up
immediately and
disposed of
properly. Storm
drain inlets are
protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous wastehandling training.  Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at all
levels ofresponsibility of the
Resort’s SWPPP as
well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  The EAC is the
location where allwaste for the Park issorted and stored prior to recycling or
proper disposal.
 Empty drums are
stored prior tocollection bysupplier.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures in thistable.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 26 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.5 Facilities Engineering Support Services: Mill Shop – Wood Working Activities Significant
Materials/
Pollutant
Sources
Materials Handling and
Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Glues Sawdust Thinner Filler Adhesives Lubricants Propane  All loading and
unloading procedures
undertaken at the
receiving areas infront of the mainshop, or directly into the canopied storagearea.
 All materials stored
indoors or under roof.
 All hazardous liquids
stored in closedsafety cabinets.
 Some lumber and
construction fences
are stored outdoors.

Stored treatedlumber is coveredwith plastic duringrain events.  Indoor vacuum
system recovers 95%of dust. Industrial
vacuum used indoors
and outdoors to
reduce dustmigration from theimmediate workarea. Outdoor areasare swept as needed.  Washdown occurs
infrequently and allwash water is either
contained and
directed tolandscaping/evaporated or
collected with ascrubber/vacuum.
 No materials are
discharged to thestorm drain system atthis facility.
 Equipment staged for
repair that has the
potential to impactstorm water is stored
in covered areas.
 Outdoor receptacles
have covers thatremained closed
when not in use.
 Glues and solvents
are used and stored
in small quantities insafety cabinets.
 Spills are cleaned up
immediately anddisposed of properly.

Storm drain inlets are
protected from spills.The MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication and
hazardous waste
handling training.
 Environmental Affairs
coordinates with MillShop managementannually to inform
appropriate Cast
Members at all levelsof responsibility of
the Resort’s SWPPPas well as generalstorm water
requirements that
prohibit the discharge
of any wastes to the
storm drain system.
 Sawdust is collected
in designated
containers fortransport to the EACfor proper disposal.
 Used rags are placed
in designated
containers andcollected by the EAC
for proper disposal.
 Recyclables such as
empty cans are
transported to theEAC for properdisposal.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures in thistable.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the procedures
in this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation to validatethe effectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 27 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.6 Facilities Engineering Support Services: Staff Shop – Attraction Figure/Prop Refurbishing Activities Significant
Materials/
Pollutant
Sources
Materials Handling and
Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Resin Catalyst Urethanes Cement Plaster Polyvinyl Solvents Acid (dilute) Degreaser  All loading and
unloading procedures
undertaken at the
receiving areas infront of the mainshop, or directly into the canopied storagearea.
 All materials stored
indoors in the main
shop and warehouse.

Some sealed drumsand equipment are
stored outdoorsunder a canopy.
 Sand and gravel, and
cement mixing
buggies are stored in
designated areas.
 Molds and other
parts stored outdoors
are covered duringrain events. Molds
not in use are storeoffsite at awarehouse facility.
 Hazardous wastes
temporarily stored indesignated coveredand bermed storage locker.
 Shop workers
responsible for their
work area. Indoorareas swept as
needed.
 Indoor vacuum
system recovers dustgenerated inside
shop.
 Outdoor areas swept
as needed withbroom only.
 No washdown occurs
outside except for in
designated wash
pads that drain t the
sanitary sewer.
 No materials are
discharged to the
storm drain system
at this facility.
 Outdoor receptacles
have covers that
remained closed
when not in use.
 Spills are cleaned up
immediately anddisposed of properly.

Storm drain inlets are
protected from spills.The Maintenance
Response Team is
contacted for larger
spills.
 Adequate spill
response materials
are available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous wastehandling training.  Environmental Affairs
coordinates withStaff Shopmanagementannually to inform
appropriate CastMembers at all levels
of responsibility of
the Resort’s SWPPPas well as generalstorm water
requirements thatprohibit thedischarge of any
wastes to the storm
drain system.
 Waste hazardous
liquids and dustcollection debris arecollected indesignatedcontainers and taken to the EAC.
 Used rags are placed
in designated
containers andcollected by the EAC
for proper disposal.Recyclables such asempty cans are also recovered by the
EAC.
 Supervisors are
responsible forassuring that all Cast
Members adhere to
the procedures in thistable.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online inthe DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the procedures
in this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness of these procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 28 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.7 Facilities Engineering Support Services: Sign Shop – Sign Production Activities Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Water-based paint Oil-based paint Solvents Rinse additive Fixer Developer Thinner Water-based ink  All loading and
unloadingproceduresundertaken at the
receiving areas in
front of the mainshop, or directly
into the canopiedstorage area.
 All materials are
stored indoors inthe main shop.
 Hazardous
materials such as
paints and solventsare stored in sealed
containers in
cabinets or on
shelves in securearea.
 Shop workers
responsible for theirwork area. Indoorareas swept as
needed.
 Outside is swept as
needed with broomonly. Nowashdown occursoutside.
 Outdoor
receptacles havecovers that
remained closed
when not in use.
 No materials are
discharged to the
storm drain systemat this facility.
 Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous waste handling training.
 Environmental
Affairs coordinateswith Sign Shop
managementannually to inform
appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Waste solvent and
paint sludge are
collected in
designatedcontainers andtaken to the EAC.Disposable paintrolls and emptyspray cans are alsocollected by the EAC.
 Used rags are
placed indesignatedcontainers andcollected by the
EAC for properdisposal.Recyclables such asempty cans are also recovered by the
EAC.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the procedures
in this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 29 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.8 Facilities Engineering Support Services: Cycle Shop – Repair and Maintenance of Attraction Vehicles Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Urethane Thinner Resin Paint Glazing Putty Lubricants
 All loading and
unloadingproceduresundertaken at
the receiving
area in the front
of the shop.
 All products and
materials stored
indoors.
 No materials are
stored outdoors.
 Shop workers
responsible for theirwork area. Indoorareas swept as
needed.
 Outside areas are
swept as needed.

Washdown occurs
infrequently and allwash water is
contained andevaporated orcollected by vacuumscrubber.
 Outdoor receptacles
have covers that
remained closed
when not in use. Nomaterials aredischarged to thestorm drain system atthis facility.  Indoor vacuum
recovers dustgenerated insideshop.
 Tools are cleaned in a
designated area wash
pad where wash
water drains to thesewer.
 Spills are cleaned
up immediately anddisposed ofproperly.
 Storm drain inlets
are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materials
are available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous wastehandling training.  Environmental
Affairs coordinateswith managementCycle Shop annuallyto inform appropriate Cast
Members at alllevels ofresponsibility of the
Resort’s SWPPP as
well as general
storm water
requirements that
prohibit thedischarge of any
wastes to the storm
drain system.
 Hazardous waste
liquids, sand blastwaste, and dustcollection systemdebris are collectedin designated containers andtaken to the EAC.
 Disposable paint
rolls and emptyspray cans arecollected by the
EAC.
 Used rags are
placed indesignatedcontainers andcollected by the
EAC for proper
disposal.Recyclables such asempty cans are also
recovered by theEAC.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the Disney
DevelopmentConnection (DDC).
 Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 30 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.9 Facilities Engineering Support Services: Paint Shop – Painting Activities Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Water-based paint Oil-based paint Solvents Thinner All paints in this shop are lead-free.  All loading and
unloadingproceduresundertaken at the
Paint Issue
receiving area.
 All materials are
stored indoors inthe main shop.
 Hazardous
materials such as
paints and solventsare stored in sealed
containers incabinets or on
shelves in secureareas.
 No materials are
stored outdoors.
 Shop workers
responsible for theirwork area. Indoorareas swept as
needed.
 Outside is swept as
needed with broomonly. Nowashdown occursoutside.
 Outdoor
receptacles havecovers that
remained closed
when not in use.
 No materials are
discharged to thestorm drain system
at this facility.
 Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication and
hazardous wastehandling training.
 Environmental
Affairs coordinates
with Paint Shopmanagementannually to inform
appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Waste thinner is
collected in 5‐galloncans and taken to
the EAC.
 A contracted haz‐
waste vendorservices cleaning
equipment andpicks up largervolumes of thinnerin drums.  Recyclables such as
empty cans, paperand drums are also
recovered by theEAC.
 Excess paint is
delivered to the EAC
for proper disposal.
 Used rags are
placed in
designatedcontainers andcollected by the
EAC for proper
disposal.Recyclables such asempty cans are also
recovered by theEAC.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records are
maintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 31 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.10 Facilities Reliability Maintenance Team, Restaurant and Retail Team – Maintenance and Repair of Equipment/Structures in Restaurant and Retail Establishments Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention
and Response
Employee Training Waste Recycling/ Disposal
Procedures
Record Keeping, Internal
Reporting, Inspections,
and Quality Assurance
Glues Sawdust Thinner Filler Adhesives Lubricants Resin Catalyst Urethanes Cement Plaster Polyvinyl Solvents Acid (dilute) Degreaser Water-based paint Oil-based paint Solvents Rinse additive Fixer Developer Thinner Water-based ink  All loading and
unloadingproceduresundertaken at
the receiving
areas in front of
the Restaurantand Retailoffices.
 All materials
stored indoors in
the main shop.
 All hazardous
liquids stored in
closed safetycabinets.
 Outdoor storage
area is small and
covered.
 No materials are
stored outdoors.
 Shop workers
responsible fortheir work area.Indoor areasswept as needed.  Outdoor areas
swept as neededwith broom only.
 No washdown
occurs outside
except for indesignated wash
pads that drainto the sanitarysewer.
 No materials are
discharged to the
storm drainsystem at thisfacility.
 Equipment
staged for repair
that has thepotential toimpact storm
water is stored in
covered areas.
 Glues and
solvents are usedand stored in
small quantitiesin safety
cabinets.
 Spills are cleaned
up immediatelyand disposed of
properly. Storm
drain inlets are
protected fromspills. The
MaintenanceResponse Team
is contacted forlarger spills.
 Adequate spill
responsematerials areavailable onsite.
 Cast Members
receivehazardousmaterialcommunicationand hazardouswaste handling training.
 Environmental
Affairscoordinates withmanagementannually toinformappropriate Cast Members at all
levels ofresponsibility of
the Resort’sSWPPP as well as
general stormwaterrequirementsthat prohibit thedischarge of anywastes to thestorm drainsystem.  Sawdust is collected in
designated containers fortransport to the EAC forproper disposal.  Waste hazardous liquids
are collected indesignated sealed cans
and stored in the
hazardous waste storagearea for collection by theEAC. Recyclables such asempty cans, paper anddrums are also recovered by the EAC.
 Waste solvent and paint
sludge are collected in
designated containersand taken to the
Environmental ActivitiesCenterEAC. Disposable
paint rolls and empty
spray cans are also
collected by theAECCenter. Used ragsare placed in designatedcontainers and collected by the EAC for proper
disposal. Recyclablessuch as empty cans arealso recovered by theEAC.  Supervisors are
responsible for assuring
that all Cast Membersadhere to theprocedures in this table.  Evaluation Reports are
maintained for fiveyears.
 SWPPP training records
are maintained online in
the Disney DevelopmentConnection (DDC).
 Routine inspections are
performed to assurecompliance with theprocedures in this table.  The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteCompliance Evaluationto validate the effectiveness of these
procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 32 4. Facilities and Operations Services Potential Pollutant Sources and Best Management Practices

4.11 Building 500 (Welding, Machine, and Sheet Metal Shops) – Mechanical and Overhaul of Attraction Vehicles Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Urethane Thinner Resin Paint, Glazing Putty Lubricants Degreaser  All loading and
unloadingproceduresundertaken at the
receiving area inthe front of the
shop.
 All materials stored
under roofs and in
impervious areas.
 No materials are
stored outdoors.
 Metal production
materials, piperoller/bender metaland plastic
shavings, and
cardboard arestored outside
under cover.
 Shop workers
responsible for theirwork area. Indoorareas swept as
needed.
 Outside areas are
usually mopped as
needed.Washdown occursinfrequently, and allwash water is contained andevaporated orcollected byvacuum scrubber.
 Outdoor
receptacles havecovers that
remained closed
when not in use
 No materials are
discharged to thestorm drain systemat this facility.
 All parts are
washed in the parts
washing cabinets.Parts washingcabinets are
serviced by avendor as needed.
 Spills are cleaned
up immediately and
disposed ofproperly. Stormdrain inlets are
protected fromspills. The
Maintenance
Response Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous wastehandling training.  Environmental
Affairs coordinateswith Building 500managementannually to inform appropriate Cast
Members at alllevels ofresponsibility of the
Resort’s SWPPP as
well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Hazardous waste
liquids are collectedin designated
sealed drums for
pick up by the EAC.
 Used rags are
placed indesignatedcontainers andcollected by theEAC for proper disposal.

Recyclables such asempty cans are also
recovered by theEAC
 Recyclables such as
metal shavings are
collected in
designatedcontainers forcollection by theEAC.
 Cutting fluids and
lubricants are
collected and
recycled by the EAC.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an Annual
Comprehensive Site
ComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 33 5. Park OperationsPotential Pollutant Sources and Best Management Practices5.1 Custodial – General – Spills from Guests/Contractors/Cast Members, Trash Liner Washing Significant
Materials/
Pollutant
Sources
Materials
Handling and
Storage
Housekeeping and Other Best Management Practices Spill Prevention and Response
Employee
Training
Waste
Recycling/
Disposal
Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Food debris Soft drinks Dairy products Sediment/ debris Wastewater These materials could contribute to pollutants such as: TSS, COD, pH, oil and grease, and aquatic toxicity.  Custodial
cleaningmaterials arereceived andstored undercover atdesignatedlocations Backof House.  Products are
approved bythe Resort’sSafety andEnvironmental Affairsdepartmentsprior to use.  Only small
amounts ofthesematerials aretransportedOn Stage
 Caustic
materials are
closelycontrolled
and arereturned toBack of Housestorage aftereach use.
 “Pan and broom” Cast Members continuously sweep On Stage areas from Park opening though approximately one hour past Park closing.
 On a weekly basis or more frequently as needed, fence‐line and roadway trash is removed by hand by an outside service
contractor.
 Disney sponsors a trash removal program along I‐5 freeway. On a weekly basis, Adopt‐A‐Highway Maintenance Company removesall miscellaneous debris from the I‐5 between Katella and Ball Road.
 Disney sponsors a trash and debris removal program and conducts graffiti abatement inside the ABC Channel. On a weekly basis, an Adopt‐A‐Channel Maintenance Company performs these tasks.  Disneyland sweeps Parking lots daily using an outside service contractor. During storm events, the Parking lot is swept and an additional crew is brought in to remove trash by hand.
 Main Back of House routes are dry swept weekly. Dry sweeping of key back stage roads occur daily during summer months or period of Santa Ana wind conditions, using an outside service contractor.  Specific Back of House areas are swept as needed, during periods of construction, using an outside service contractor.
 Wet power‐scrubbers are used to pick up wash water when cleaning chemicals are used.
 Wet power‐scrubbers are used for the cleanup of areas where there may be residual oil.
 Wet power‐scrubbers are used in areas where there is excessive fowl deposition.
 Wet power‐scrubbers are used in preparation for the application of slurry coating.
 Main Back of House roads in front of shops are dry‐swept using street sweepers as needed. Leaf blowers are used to move lightdebris away from structures to facilitate effective sweeping.  Spills of oil
products arecleaned withdry absorbentmaterialswhich areswept up and disposed of
properly.
 Spills are
cleaned upimmediatelyand disposedof properly.Storm draininlets are protectedfrom spills.

The Main‐
tenanceResponseTeam is
contacted forlarger spills.
 Adequate spill
responsematerials areavailableonsite.
 Cast
membersare informed
of theapproveddesignatedsanitarysewerdrains.
 Environment
al Affairs
coordinateswithCustodialmanage‐mentannually toinformappropriateCastMembers atall levels ofresponsibility of theResort’sSWPPP aswell asgeneralstorm water requirement
s thatprohibit thedischarge of
any wastesto the stormdrainsystem.
 Wash
water from
vacuumscrubbertanks isdischargedto sanitarysewer.
 Wash
water from
cleaningoperationsis deposedof into thesanitarysewer Backof House.  No
concentratedchemicalsaredisposed of
in stormdrains or
sanitary
sewers.
 Supervisors are
responsible for
assuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation
Reports aremaintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine
inspections are
performed toassurecompliance withthe procedures in
this table.
 The
EnvironmentalAffairsDepartmentconducts anAnnualComprehensiveSite ComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 34 5. Park Operations
Potential Pollutant Sources and Best Management Practices

5.2 Custodial – Park Washdown – Spills from Contractors/Cast, Use of Scrubbers/Sweepers Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Food debris Soft drinks Dairy products Sediment/debris Wastewater These materials could contribute to pollutants such as TSS, COD, pH, oil and grease, and aquatic toxicity.  Washdown of
paved areas is donewith high‐pressure
water only.
 No chemical
cleaners are used to
wash outdoorareas.
 Outdoor eating
areas and outdoor
vending cartlocations are swept
prior to washdown
to reduce pollutantsentering wash
water
 Vacuum scrubbers
are also used to
collect a significantportion of the wash
water from high
traffic areas.
 Vacuum scrubbers
empty the contents
of their wash watertanks to designatedsanitary sewerdrains.  Filters in catch
basins cleaned areas needed.
 Spills of oil products
are cleaned with
dry absorbent
materials which are
swept up and
disposed ofproperly.
 Food and drink
spills which occur
On Stage are
cleaned upimmediately andthe affected areawashed as needed.  Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team iscontacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast members are
informed of theapproveddesignated sanitarysewer drains.  Environmental
Affairs coordinateswith Custodialmanagementannually to inform appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm water
requirements that
prohibit thedischarge of anywastes to the stormdrain system.  Wash water from
vacuum scrubber
tanks is dischargedto sanitary sewer.
 Wash water from
cleaning operationsis deposed of intothe sanitary sewer Back of House.
 No concentrated
chemicals aredisposed of in stormdrains or sanitary
sewers.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliance
with the procedures
in this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 35 5. Park Operations
Potential Pollutant Sources and Best Management Practices

5.3 Custodial – Restaurant/Kitchen Cleaning
Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Food particles Grease These materials could contribute to pollutants such as TSS, COD, pH, oil and grease, and aquatic toxicity.  Custodial cleaning
materials arereceived and stored
under cover atdesignatedlocations Back of
House
 Products used
during cleaningoperations areapproved by theResort’s Safety and EnvironmentalAffairs departments
prior to use.
 Only small amounts
of these materialsare transported On
Stage.
 Caustic materials
are closelycontrolled and are
returned to Back ofHouse storage aftereach use.
 No wash water is
allowed to bedischarged outsidethe restaurants.
 All mop sinks drain
to sanitary sewer.
 Sanitary grease
interceptors areinstalledthroughout thePark and regularly maintained.
 Wash water from
screen/baffle filter
cleaning, and floorcleaning goes to
sanitary sewer.
 Equipment washing
is done indesignated areasthat drain to thesanitary sewer.  Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted for largerspills.
 Adequate spill
response materialsare available onsite.
 Cast members are
informed of theapproveddesignated thatdrain to sanitarysewer.  Environmental
Affairs coordinateswith Custodialmanagementannually to inform appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm waterrequirements that
prohibit thedischarge of anywastes to the stormdrain system.  Wash water from
cleaning operationsis disposed of intothe sanitary sewer at each kitchenfacility.
 No concentrated
chemicals aredisposed of in stormdrains or sanitarysewers.  Supervisors are
responsible forassuring that allCast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Department
conducts an Annual
Comprehensive Site
ComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 36 5. Park Operations
Potential Pollutant Sources and Best Management Practices

5.4 Custodial – Fireworks Cleanup
Significant Materials/
Pollutant Sources
Materials Handling and
Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention
and Response
Employee Training Waste Recycling/
Disposal
Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Fireworks fallout may contain the following: Paper, debris, heavy metals, gunpowder, ash. These materials could contribute to pollutants such as TSS, heavy metals, and aquatic toxicity.  No custodial cleaning
materials are used in this
activity.
 All new and spent fireworks
and fireworks debris aretransported, handled,accumulated, and disposed of in compliance with all
local Fire Codes, NFPA 1123
Codes, Alcohol, Tobacco,and Firearms regulations,
State Fireworks codes,Department of
Transportation, California
DTSC (Title 22), and RCRAregulations included in:

State Fireworks Law, California
Health and Safety Code, Section
12500 ‐ 12726State Fireworks Regulations, Title
19, California Code of Regulations,Chapter 6Storage, Title 27, Code of FederalRegulations part 55, Sub‐part K Hazardous Materials
Transportation, Title 13,
California Code of Regulations,
Selected Sections
 A contractor
hired by the Park
Operationssweeps fireworks
fallout up aftereach show.
 The local Fire
Departmentrequires thecontractor toinspect the wastefireworks for anyundetonatedmaterials.  Roofs within the
fall out zone arecleaned afterseven shows and
prior to
forecasted rainevents.
 Spills are cleaned
up immediatelyand disposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted forlarger spills.
 Adequate spill
responsematerials areavailable onsite.
 Adequate spill
responsematerials aremaintained insheds/lockers andDisneyland FireDepartment vehicles.
 The contractor is
instructed tofollow each of the
procedures
described in this
table as well asthe general storm
waterrequirementswhich prohibitdischarge of anywastes to thestorm drainsystem.  Waste is disposed
of at the EAC
after beinginspected asrequired by theFire Department.
 Waste is
periodicallytransferred to the
Hazardous WasteStorage Area forpick up anddisposal by a certified wastedisposalcompany.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 37 5. Park Operations
Potential Pollutant Sources and Best Management Practices

5.5 Custodial – Tram Washing
Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Detergents Dirt/debris Oil/grease Tram car wash water may contain: detergents, food particles, soft drink liquids. These materials could contribute to pollutants such as TSS, COD, pH, oil and grease, and aquatic toxicity.  Custodial cleaning
materials arereceived and stored
at designated
locations in the
Back of House area.
 All cleaning
materials are pre‐
approved by theResort’s Safety and
EnvironmentalAffairs departments
prior to use.
 Tram car wash
water activities areconducted in a
designated area
that is contained
and drains to thesanitary sewerthrough a clarifier.
 High pressure
sprayers are utilizedto minimize water
use.
 Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted for largerspills.
 Adequate spill
response materialsare available onsite.
 Cast members are
informed of theapproveddesignated sanitarysewer drains.  Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm water
requirements thatprohibit the
discharge of any
wastes to the stormdrain system.
 Wash water from
cleaning operationsis discharged to thesanitary sewerthrough an inground clarifier.  Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 38 5. Park Operations
Potential Pollutant Sources and Best Management Practices

5.6 Custodial – Indoor Area Cleaning Activities
Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Chemical cleaners Degreasers Ammonia Polishes Cleaning activities such as carpet cleaning, and indoor window washing require the use of a wide variety of chemical cleaners, degreasers, ammonia, and polishes.  Custodial cleaning
materials arereceived and stored
at designated
locations in the
Back of House area.
 Products are
approved by the
Resort’s Safety and
EnvironmentalAffairs departments
prior to use.
 Only small amounts
of these materials
are transported On
Stage.
 Caustic materials
are closely
controlled and are
returned to backstage storage aftereach use.
 No cleaning
materials aredischarged to thestorm drain system.
 Spent wash water
from any cleaningactivity are dumpedinto designatedsanitary sewerdrains.  Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast members are
informed of theapproved
designated sanitarysewer drains.
 Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at alllevels ofresponsibility of the
Resort’s SWPPP as
well as general
storm water
requirements thatprohibit thedischarge of anywastes to the storm drain system.
 Wash water
generated from
cleaning operationsis captured anddisposed of at a
sanitary sewerlocation.
 No concentrated
chemicals aredisposed of in storm
drains or sanitary
sewers.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliance
with the procedures
in this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 39 5. Park Operations
Potential Pollutant Sources and Best Management Practices

5.7 Circle D Ranch – Animal Confinement Area, Animal Bathing Significant
Materials/
Pollutant
Sources
Materials
Handling and
Storage
Housekeeping and Other Best Management
Practices
Spill Prevention
and Response
Employee
Training
Waste Recycling/
Disposal
Procedures
Record Keeping,
Internal Reporting,
Inspections, and Quality
Assurance
Manure Dirt/debris
 Products are
approved by
the Resort’sSafety andEnvironmentalAffairsdepartmentsprior to use.  Products are
stored undercover and onimperviousareas.
 Drainage and local catch basins are designed
to provide retention time sufficient for
removal of any solids.
 A barn is used to house animals during and
following storm events.
 A portion of the corral used for storm water
retention is maintained as such until the stormwater has naturally subsided, as required byour NPDES permit.  Prior to storm events, paved areas of the
Ranch and the storm water retention area
(Corral) are inspected and cleaned as needed.
 Catch basins at the Ranch are kept clean and
free of debris which is managed as manure.
 The manure staging area and bin are
maintained in a covered facility to containrun‐on and to prevent runoff.  Loose debris is directed toward the manure
staging area with a leaf blower for subsequent
disposal in the manure bin.
 Animals are only bathed in a small washdown
area which drains to the sanitary sewer and is
contained to prevent runoff and run‐on.
 Washdown of the Circle D area is strictly
limited to specific special events. Prior to any
washdown the area is inspected by Circle D
Cast Members and “dry” cleaned as needed.
 Spills are
cleaned upimmediatelyand disposedof properly.Storm draininlets areprotected from spills. The
MaintenanceResponse Team
is contacted forlarger spills.
 Adequate spill
responsematerials are
availableonsite.
 Cast members
are informed of
the approveddesignatedsanitary sewerdrains.
 Environmental
Affairscoordinateswithmanagementannually toinformappropriateCast Members at all levels of
responsibilityof the Resort’s
SWPPP as wellas generalstorm water
requirementsthat prohibitthe discharge
of any wastes
to the storm
drain system.
 Manure is
moved daily to
the coveredmanurestaging areaprior to daily
disposal in themanure bin.
 Animal waste
collected dailyfromdumpsters.
 Supervisors are
responsible forassuring that all CastMembers adhere to
the procedures in thistable.
 Evaluation Reports are
maintained for five
years.
 SWPPP training
records are maintainedonline in the DisneyDevelopmentConnection (DDC).  Routine inspections are
performed to assurecompliance with theprocedures in this table.
 Records of manure
disposal are kept byCircle D.
 The Environmental
Affairs Department
conducts an AnnualComprehensive Site
Compliance Evaluationto validate theeffectiveness of these procedures
ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 40 6. EntertainmentPotential Pollutant Sources and Best Management Practices6.1 Parade Services – Parade Float Maintenance Activities Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Oil Grease Detergents Battery acid Paints
 Products are
approved by theResort’s Safety and
EnvironmentalAffairs departments
prior to use.
 Products are stored
under cove and on
impervious areas.
 Parade floats are
washed in an area
that drains tosanitary sewer.
 Used batteries are
stored incontainment racksfor pick up.
 Methods are used
to prevent drift andoverspray duringpainting operations (i.e. drop cloth,drapes, tarps)
 Shop workers
responsible for theirwork area.
 Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast Members
receive hazardousmaterialcommunication andhazardous waste handling training.
 Environmental
Affairs coordinates
with managementannually to inform
appropriate Cast
Members at all
levels ofresponsibility of theResort’s SWPPP as
well as general
storm water
requirements that
prohibit the
discharge of anywastes to the stormdrain system.
 Wash water
generated from
cleaning operationsis captured anddisposed of at a
sanitary sewerlocation.
 Hazardous waste
liquids are collectedin designated
containers andtaken to the EAC.
 Used rags are
placed indesignatedcontainers and
collected by the
EAC for properdisposal.Recyclables such asempty cans are also recovered by theEAC.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained online
in the Disney
DevelopmentConnection (DDC).
 Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 41 7. Food and BeveragePotential Pollutant Sources and Best Management Practices7.1 Outdoor Vending – On Stage Vending Activities Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Soft drinks Dairy products Sugar Grease Salt Food particles  Bulk food materials
are received andstored indoors.
 Only small
quantities of food
and liquids are
transported On
Stage.
 Liquid waste from
ODV carts are
either connected tosanitary sewerdrains On Stage orare discharged in designated areasBack of House that
drain to the
sanitary sewer.
 No wastes are
allowed todischarge to theground or Parkwaterways.
 Food debris where
vending carts arestaged are picked
up or swept
throughout the day.
 Spills are cleaned
up immediately anddisposed ofproperly. Stormdrain inlets are protected fromspills. The
Maintenance
Response Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Wash water is
either contained orcollected with ascrubber/vacuum.
 Cast members are
informed of theapproveddesignated sanitarysewer drains.  Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at all
levels ofresponsibility of theResort’s SWPPP as
well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Food spoils are
disposed of in trash
compactors in Backof House areas.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Department
conducts an Annual
Comprehensive Site
ComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 42 7. Food and Beverage Potential Pollutant Sources and Best Management Practices

7.2 Outdoor Vending – Back of House Vending Preparation and Cart Cleaning Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Soft drinks Dairy products Sugar Grease Salt Food particles Detergents Bleach Brass polish  Bulk food materials
are received andstored indoors.
 Cleaning products
are approved by theResort’s Safety and
EnvironmentalAffairs departments
prior to use.
 Outdoor vending
carts are washed in
designated Back ofHouse areas thatdrains to thesanitary sewer.  Wash water from
freezers drains to
the sanitary sewer.
 No wastes are
allowed todischarge to thestorm drain system.
 All liquid sugar
waste tanks fromOutdoor VendingCarts are dumped
to the sanitarysewer.
 Spills are cleaned
up immediately and
disposed of
properly. Storm
drain inlets are
protected fromspills. The
Maintenance
Response Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Cast members are
informed of theapproveddesignated sanitarysewer drains.  Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm water
requirements thatprohibit thedischarge of anywastes to the stormdrain system.  Food spoils are
disposed of in trash
compactors in Backof House areas or
are placed in foodwaste containersfor recycling.
 Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an Annual
Comprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland® Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 43 7. Food and Beverage Potential Pollutant Sources and Best Management Practices

7.3 Restaurants – Restaurant Cooking and Serving Activities Significant Materials/
Pollutant Sources
Materials Handling
and Storage
Housekeeping and
Other Best
Management
Practices
Spill Prevention and
Response
Employee Training Waste Recycling/
Disposal Procedures
Record Keeping,
Internal Reporting,
Inspections, and
Quality Assurance
Food wastes Diary wastes Waste cooking oils and fats Detergents  Bulk food materials
are received andstored indoors.
 Cleaning products
are approved by theResort’s Safety and
EnvironmentalAffairs departments
prior to use.
 Restaurant
operations areenclosed within thebuilding or indesignated areasthat drain to the sanitary sewer.
 No wash water is
allowed to be
discharged outside
the restaurants.
 Grease interceptors
are installed
throughout thePark and regularly
maintained.
 Wash water from
all the followingsources goes tosanitary sewer:kitchen equipmentcleaning,screen/baffle filtercleaning, and floorcleaning.  Spills are cleaned
up immediately anddisposed ofproperly. Storm
drain inlets are
protected fromspills. The
MaintenanceResponse Team is
contacted for larger
spills.
 Adequate spill
response materialsare available onsite.
 Spills of waste
cooking oils andfats near wastestorage drums arecleaned upimmediately.  Cast members are
instructed to “cleanas they go” when
operating the
restaurants.

Wastes are notallowed toaccumulatethroughout the day.
 Cast members are
informed of theapproveddesignated sanitarysewer drains.  Environmental
Affairs coordinateswith managementannually to inform
appropriate Cast
Members at alllevels ofresponsibility of theResort’s SWPPP as well as general
storm waterrequirements that
prohibit thedischarge of anywastes to the storm
drain system.
 Food spoils are
disposed of in trash
compactors in Backof House areas or
are placed in foodwaste containersfor recycling.
 Waste cooking oils
and fats are
collected in covered55‐gallon drums or
specially designated
d bins behind
restaurants forrecycling.
 Kitchen grease
containers are
located away from
storm drains, andare clean, covered,in good repair andserviced weekly.  Supervisors are
responsible forassuring that all
Cast Members
adhere to theprocedures in this
table.
 Evaluation Reports
are maintained forfive years.
 SWPPP training
records aremaintained onlinein the DisneyDevelopmentConnection (DDC).  Routine inspections
are performed to
assure compliancewith the proceduresin this table.
 The Environmental
Affairs Departmentconducts an AnnualComprehensive SiteComplianceEvaluation tovalidate theeffectiveness ofthese procedures.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 44

8. Additional Programs and Best Management Practices
The Disneyland Resort implements numerous additional programs related to storm water pollution prevention and management that include innovative and proactive BMPs.

The following sections highlight the numerous programs in place at the Resort or in the vicinity of the Resort that positively impact storm water quality.

8.1 Post‐Construction Treatment BMPs
In 2008, the Disneyland Resort partnered with the City of Anaheim to develop a Master Water Quality Management Plan (Master WQMP) in anticipation of future land redevelopment at the Resort.   The Master WQMP includes the use of low impact development techniques in the project design to reduce the amount of storm water discharged to the ocean and improve the quality of discharged water.

Pollutant treatment and volume reduction BMPs suggested by the Master WQMP include porous pavement, percolation ponds, infiltration basins and bioretention swales.   The implementation of the Master WQMP has a direct correlation with the success of the Resort’s storm water management practices and improvements in storm water runoff quantity and quality.

The Master WQMP is based on a long‐term development plan for the Disneyland Resort in order to accommodate the most practicable BMPs for the entire watershed and provide a more comprehensive and sustainable water quality program.  Periodic updates of the Master WQMP (anticipated to take place every four to five years) will ensure that projected changes in land use through site development or significant redevelopment are taken into account.

Source control BMPs are based on the extensive list provided in this SWPPP.  Site design and treatment control BMPs are based on the Orange County (OC or County) Drainage Area Management Plan (DAMP) prepared to comply with the Municipal Separate Storm Sewer System NPDES Permit (CAS618030) issued for north Orange County and the City.   The DAMP and the City’s storm water treatment BMP requirements for development and significant redevelopment are met by the Disneyland Resort with an emphasis on a pre‐determined list of the most suitable BMPs for the existing constraints on a Disneyland Resort site that is extensively developed and presents limited opportunities for certain BMPs.  As a result, the Master WQMP includes a more comprehensive, holistic, consistent, and methodical approach to the selection and implementation of site design and treatment control BMPs for the Disneyland Resort to comply with land development related storm water quality.

The development and significant redevelopment projects for the Disneyland Resort are known approximately three to five years out, sometimes longer, and are implemented in phases.  The Master WQMP takes into account these numerous projects and anticipates the selection of BMPs most suitable for the long‐range plans and development.   The benefit to the City is having their Master WQMP be equivalent to a “conceptual” WQMP that includes BMPs proposed for the entire site and is the basis of future detailed project‐specific WQMPs.  Secondary benefits to the Disneyland Resort and the City are a streamlined and more effective permit approval process and a long‐term water quality planning process.

The Resort has implemented WQMP development and redevelopment projects with the specific intent of reducing and controlling pollutants anticipated from the on‐going operation and use of the developed property.   The three types of BMPs include: source control (both structural and non‐structural); low impact design BMPs, which includes permanent design features embedded into the property that generate lower pollutant discharges and flows during storm events; and treatment control BMPs, which are structural systems designed to remove pollutants.   The BMPs are selected to address site specific pollutants based on the use category (e.g., restaurant, parking lot).

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 45
In order to follow through with these efforts, Disneyland Resort has been committed to designing environmentally friendly practices for the development of new attractions and the redevelopment of existing attractions throughout the facility.   More recently, the Resort has concentrated its efforts to minimize non‐point source pollution from construction and post‐construction of new areas and attractions throughout Disneyland Resort and specifically with the expansion of Disney California Adventure.

Newer installations include porous pavement, percolation ponds, downspout filtration, automatic rain diversion systems, inline clarifiers, grease interceptors, and bioretention swales.  Many of these measures were included in the construction of the following facilities:

DISNEYLAND RESORT CENTRAL BAKERY – Disneyland Resort commissioned a new 10,000 square foot central bakery facility in March 2009 which produces 90% of all baked goods for their restaurants, hotels, and stores.  The facility consolidated most of the Resort’s baking operations into one location that has been designed and built with state of‐the‐art improvements, including daylight systems, energy star equipment, demand response and peak load shifting technologies, landscape infiltration elements, and sustainable pavement solutions.   Bioswale landscape elements and sustainable porous pavement solutions were designed to remove silt and pollutants from surface runoff water, and are instrumental in recharging groundwater by capturing storm water and allowing it to seep into the ground.  Downspouts from roof drains are also fitted with Hydro FloGard® Downspout Filters designed to collect particulates, debris, metals, and petroleum hydrocarbons that accumulate on rooftops from atmospheric deposition prior to discharge to landscaped bioswales.

The central bakery’s retention and pervious surfaces are designed to infiltrate storm water.   Pollutant removal occurs through the infiltration of runoff and absorption of pollutants to the soil and vegetation, and is designed to infiltrate within 48 to 72 hours.  This BMP provides for nearly 100% removal efficiency of the entire water volume.

DISNEYLAND RESORT SURFACE PARKING LOT – This project consisted of the construction of approximately 25.5 acres of parking area (4,247 regular spaces and 84 handicapped spaces) on which porous pavement, a permeable pavement surface with an underlying stone reservoir that temporarily stores surface runoff before infiltrating into the subsoil, was installed instead of traditional pavement, allowing parking lot runoff to infiltrate directly into the soil as part of an engineered water quality treatment design.  Porous pavement was significantly more expensive than traditional asphalt.

The undeveloped project area predominantly drained towards an existing detention basin.  To accomplish effective surface drainage, the site was raised approximately five feet which facilitated 80% of the site to drain back toward the detention basin.  The remaining 20% drains into an infiltration basin.  Any storm water runoff from this newly developed area flows to either the existing detention basin or the infiltration basins channeled through v‐shaped bioswales that were designed to be hydraulically capable of handling both the first flush and the larger 100‐year storm event.

The storm water treatment BMP features at this site are the following:

Bioswales/V‐channel (Vegetative Swales): Approximately 4,000 linear feet of bioswales are used throughout the site for cleaning storm water before entering either a detention basin or infiltration basin for infiltration.  They are also the principal storm water drain system for higher flows.  These swales are part of a treatment train for pollutant removal prior to infiltration.

Infiltration Basins and Trench: An infiltration basin and trench with a combined retention capacity of approximately 0.95 acre feet lies along Harbor Boulevard just north of Convention Way.   These BMPs ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 46
were designed to store and infiltrate the resultant runoff from the porous pavement that was not able to be stored in its subsurface gravel beds.   In addition, two other infiltration basins are provided for an additional retention capacity of 0.50 acre feet.  An easterly infiltration basin and trench were added to treat the runoff from the additional parking.   The easterly infiltration basin has a capacity of approximately 0.195 acre feet.

Pervious Pavement: Approximately 20% of the developed site is pervious pavement designed to reduce runoff by allowing storm water to infiltrate through its porous surface into gravel beds below for storage and infiltration into the native soil.

Extended Detention Basin (existing): A sediment forebay was added to the existing detention basin in order to enhance sediment capture before runoff exits the basin into the City’s storm drain system.  The existing detention basin is capable of retaining not only the first flush volume but the entire 100‐year runoff volume while metering out a quantity of flow designed to minimally impact the existing storm drain system along Harbor Boulevard.  Treated water from the bioswales enters the sediment forebay and is allowed to fill to a depth of 1.5 feet before overflowing into the existing detention basin.  Inlets and cleanouts have 1‐inch sumps designed for sediment capture.

DISNEY CALIFORNIA ADVENTURE BACK OF HOUSE BUILDINGS –The DCA Back of House is a network of buildings, exterior storage areas, and staging areas which for the most part are organized along a heavily used loop‐road.   This collection of interior and exterior spaces provides the necessary framework to support the operation of the theme park.   Storm water on the existing site previously sheet flowed to drains and catch basins located at local low points.  Storm water was then conveyed by the private storm drain system to the city storm drain system.  This project included the addition of four new buildings on already developed, mostly paved areas, resulting in very minimal increase of impervious foot prints.

The total area of the project was 2.0 acres, or 87,120 square feet, which includes buildings/structures, parking areas, and landscaped areas.  The production kitchen was built with two loading docks fitted with an oil/sediment separator and equipped with rain diversion valves installed in vaults.   Trash packers installed at this facility are large trash compactor units with 50 gallon clarifiers to capture hydraulic oil in the event of a line failure, and are also equipped with an independent rain diversion valve.  These rain diversion systems allow for the discharge of runoff from the wash down wastewater, and first flush rainwater to be directed to the sanitary sewer.   A rain gauge activates a rain valve that switches to discharge to the storm drain system after 1/10th of an inch of rainfall.  Storm water from the loading docks is discharged into the swale for runoff treatment.

A grease interceptor and outdoor wash pads are also provided to prevent storm water pollution.  These areas are covered and do not allow for rain water runoff to the storm drain system.  The roof area for the production kitchen is 10,375 square feet (0.24 acres), the central maintenance facility roof area is 5,746 square feet (0.13 acres), the custodial multipurpose building roof area is 3,407 square feet (0.08 acres), and the roof area for the entertainment complex is 10,145 square feet (0.23 acres).

Runoff from these facilities is treated using the vegetated swale and pervious pavement infiltration.

Concrete walk areas in front of these facilities is about 1,177 square feet.  It is engineered to drain to the adjacent pervious pavement at the cart parking stalls.  Parking areas designated for vehicles to the west of these buildings incorporates 3,696 square feet of porous asphalt surfaces.

THE VILLAS AT DISNEY’S GRAND CALIFORNIAN HOTEL & SPA – The expansion of Disney’s Grand Californian Hotel & Spa included the addition of 200 guest rooms, 50 suites, two levels of underground parking, a pool, and pathways and driveways to the hotel.   This expansion is known as The Villas at Disney’s Grand Californian Hotel & Spa.  The total area of this project was 2.88 acres, of which 1.69 acres ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 47
are the building and surrounding hardscape, and 1.19 acres are pervious ground with landscaped and planter areas.  Portions of the roof were designed to drain to landscaped areas.  The majority of the roof runoff is collected by downspouts and piped over to a vegetated swale which facilitates the treatment of storm water and promotes infiltration instead of direct discharge to the storm drain system.  These swales are also the principal storm water drain system for higher flows and are part of a treatment train that also includes downspout filters for pollutant removal prior to infiltration.

A small portion of the roof that could not be directed to either landscape or the swale was piped to a dedicated Stormceptor® unit prior to discharge off site.  The subterranean parking area was engineered to preclude storm water run‐on with a ribbon gutter at the ramp entrance, and the intercepted sheet flow is directed to a catch basin fitted with an Ultra‐Urban® inlet filter insert.  Area drains within the parking lot that capture nuisance flow are directly connected to the sanitary sewer so as to avoid pumping polluted water to the storm drain system.

CARS LAND – In June 2012, Cars Land was unveiled at Disney California Adventure.  This redevelopment project includes new attractions, dining areas, and shopping venues.  The 12‐acre project included new themed buildings, roads, bridges, tunnels, waterfalls, and landscaped areas.  Cars Land is the largest area treated by storm water BMPs within the Disneyland Resort.  Great consideration was given in order to incorporate the latest and most effective storm water treatment technologies into this project.   The impervious area of the original Timon Parking Lot, which was redeveloped for Cars Land, has been replaced with landscaping and pervious areas allowing for storm water infiltration and treatment.

In addition, this project site has numerous BMPs designed to retain or capture and infiltrate treated storm water runoff allowing for replenishment of shallow groundwater aquifers.  The many guests who visit this new land will never know that the BMPs collectively treat 96.3% of the project area.  The remaining 3.7% of the project footprint was not treated because it was part of a right of way owned by a 3rd party utility company.  All of these attractions and sites include post construction features that maximize pervious areas, treat and infiltrate storm water, and reduce or prevent the discharge of pollutants to the public conveyance system.

The strategy just presented can be summarized as follows: By selecting the most appropriate combination of final BMPs for each project and simultaneously considering the entire Resort’s redevelopment projects included in the Master WQMP, storm water management and development can both be effectively maximized.

8.2 Adopt‐A‐Channel Program
Disneyland Resort discharges storm water to the Anaheim Barber City (ABC) Channel which is a 45,658‐ foot concrete lined storm drain system designed to reduce flooding in multiple cities across Orange County.  The channel has been impacted by debris from city streets as well as illicit dumping, overgrowth of vegetation, and reoccurring vandalism of structures with graffiti.  For decades, the Disneyland Resort has incorporated structural and non‐structural BMPs into its operations that are specifically designed to reduce, and in many cases eliminate, potential pollutants, resulting in a higher quality of water being discharged through the onsite storm drain system to the ABC Channel which is heavily impacted by debris and pollutants.

In 2012, Disneyland Resort approached the Orange County Public Works Department (OC Public Works) to seek a partnership for this conceptual pilot program proposed to include the field resources of OC Public Works and the outreach resources of the Disneyland Resort to adopt portions of the ABC Channel and provide cleaning and maintenance of the channel on a routine basis.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 48
Disneyland Resort spearheaded the initiation of this program with the adoption of a two‐mile section of the channel from the Disneyland Resort at Ball Road extending south towards the Bolsa Chica Ecological Reserve at Palmwood Drive within the Orange County Flood Control District’s right of way.

The Disneyland Resort engaged the Orange County Sheriff’s Department to partner with the project team to enter data into the Sheriff’s “Tracking Automated Graffiti Reporting System” (also known as TAGRS).

This system is a mobile application designed to serve the needs of law enforcement agencies to identify offenders and reduce graffiti in order to improve the quality of life for the residents.

Waste within the channel has shown significant improvements which includes trash and debris removal, and weed abatement in the Orange County Flood Control District’s right of way using mechanical means (herbicides or algaecides are not used).  Graffiti removal has included thousands of square feet abated by covering with water based paint.  Vandalism in this channel has decreased by almost 90% since July 2013.

The Disneyland Resort generates an annual report for the period of July 1 through June 30 of the previous year, and submits it to the Director of OC Public Works.

Waste removed from the channel includes mostly household items and general trash and debris.  Large quantities of waste associated with graffiti activities are also routinely removed.  Below is a list of the most common items removed:
 Empty aerosol spray cans     Alcohol containers    Wood fencing  Paper            Lawn furniture      Blankets
 Fast food containers      Footballs      Newspapers Flood channels impacted by debris can pose high risks to residents and entire communities along the right‐of‐ways during storm events and can result in displacement of occupants as well as home damage.

They are also breeding grounds for insects that thrive on wet environments where ponding is prevalent and can drive an increase in illnesses associated with exposure to mosquitoes in epidemic outbreaks like the West Nile Virus (WNV).  Long‐term impacts include devastating disruptions in the natural habitats of wildlife in sanctuaries and reserves that are downstream of may flood control channels.  The ABC Channel discharges directly into the Bolsa Chica Ecological Reserve which has been designated by the California Department of Fish and Wildlife as a nature reserve to protect coastal wetlands containing resident threatened and endangered species.

Reducing tagging and other illicit activity within and around the flood control channels restores pride among communities and deters the reoccurrence of new graffiti being applied as their displays are short lived.  Having crews inspect sites on a weekly basis and remove graffiti as soon as it is found has proven to reduce the reapplication of new tags with a high success rate.

One of the main goals of the adopt‐a‐channel program is for other cities and public and private organizations to take this model and apply it to their own flood channels.   To facilitate future implementation by others, the Disneyland Resort worked closely with each of the stakeholder government agencies from the inception of the program to design a streamlined approach to its implementation. Areas reviewed for streamlining include municipal program development, city permitting and approval, public and private adoptee application process (to simplify it), and routine and reoccurring maintenance scheduling.   Also important was the development of waste collection and disposal protocols to validate that all applicable laws are followed, implementation of a sustainable on‐going program through permitted and fully insured contractors, uniformity in paint selection for concrete lined flood channel graffiti abatement, control of weeds where necessary, protection of wildlife, beneficial vegetation, and sediment forebays, and a safe environment for crews to work in.  All of these parts were ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 49
packaged into a comprehensive working document that is intuitive and easy for cities as well as the general public to follow and implement.

Partnerships with government agencies, like the City of Anaheim, OC Public Works, and the Orange County Sheriff’s Department, and non‐profit organizations, including the OC Conservation Corps, Wyland Foundation, and Bolsa Chica Conservancy, are fundamental in the success of programs like these as cities are often unable to fund and sustain projects with accelerated maintenance frequencies specifically focused on deterring taggers and illicit dumping.  The Disneyland Resort is committed to environmental protection and in this case, specifically on the water we discharge from our theme parks.

8.3 Non‐Storm Water Diversion to Sanitary Sewer
In 2012, Disneyland Resort approached the Orange County Sanitation District (OCSD) and the Orange County Water District (OCWD) to develop a multi‐year dry weather flow diversion plan for the discharge of nightly washdown water from On Stage areas and limited nuisance flows from the Rivers of America to the sanitary sewer.   This collaboration was not only significant in the Disneyland Resort’s approach to non‐storm water management but timely as it correlated with the expansion of the OCSD Groundwater Replenishment System (GWRS).   The OCSD had just announced their second phase of development in January 2012, which is scheduled to be completed in September 2014 and which will have a daily production capacity of 100 million gallons per day.  The current system has a production capacity of 70 million gallons of water per day and a total production of 23.5 billion gallons per year.

Recognizing that the water discharged from the Resort was of higher quality coupled with the OCSD’s need for additional source water for the GWRS, the project was fully supported by the OCSD, OCWD, and the RWQCB.   The Resort’s program is phased over a five‐year project term with the larger volume discharge points being scheduled first.  At the end of 2012, the largest of the pump stations came on line which diverts approximately half of the total non‐storm water volume generated at the Disneyland Resort.   In doing so, the Disneyland Resort has reduced the amount of permitted non‐storm water originally discharged to the ocean.

The GWRS takes highly treated wastewater that would have otherwise been discharged to the Pacific Ocean and purifies it to near‐distilled quality water.  This is done with advanced techniques consisting of microfiltration, reverse osmosis, and ultraviolet disinfection with hydrogen peroxide.  Water is then used to replenish the Orange County groundwater basin and to prevent seawater from contaminating the county's groundwater supplies.

Non‐storm water discharge diversion is being achieved through the design and construction of fully automated, redundantly equipped pump stations that divert non‐storm water to the sanitary sewer system.  These pumps are turned off by an automatic rain sensor during rain events following an initial discharge of storm water, allowing it to bypass the pump station and flow directly into the storm drain system.  Non‐storm water discharges to the GWRS meet the requirements of the Resort’s Permit and far exceed the conditions and requirements in OCSD’s Special Purpose Discharge Permit.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 50

9. Glossary/Definitions
ABC Channel – Anaheim Barber City Channel – a storm drain system designed to reduce flooding in multiple cities across Orange County
AQMD – Air Quality Management District – The AQMD is the air pollution control agency for all of Orange County and the urban portions of Los Angeles, Riverside and San Bernardino counties.   AQMD is responsible for controlling emissions primarily from stationary sources of air pollution.

BMPs – Best Management Practices are measures or practices used to reduce the amount of pollution entering surface waters, air, land, or ground waters.  BMPs may take the form of a process, activity, or physical structure.

Cast Members – Disneyland Resort staff
City – City of Anaheim
Clean Water Act – The Federal Clean Water Act established the basic structure for regulating discharges of pollutants into the waters of the United States.

DAMP – Drainage Area Management Plan
DCA – Disney California Adventure
DLR – Disneyland Resort includes: two theme parks  ‐ Disneyland and Disney California Adventure; three hotels  ‐  Disneyland Hotel, Disney’s Paradise Pier Hotel, and Disney’s Grand Californian Hotel; and Downtown Disney, which is a retail, dining, and entertainment district.

EAC – The Environmental Activities Center is the central location at the Resort for solid waste management including trash, recyclables, hazardous and universal wastes.

Environmental Affairs – The Disneyland Resort Environmental Affairs Department EPA – Environmental Protection Agency – The EPA works to develop and enforce environmental policy and regulations throughout the country.   The EPA was established in 1970, the same year as the first Earth Day, in response to growing concerns over air, water, and soil pollution.

GWRS – Groundwater Replenishment System
HMRR – Hazardous Material Release Response
Master WQMP – Master Water Quality Management Plan
MSDS – Material Safety Data Sheet – An MSDS contains details of the hazards associated with a chemical, and gives information on its safe use.

MEP – Maximum Extent Practicable
MRT – Maintenance Response Team
ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 51
NPDES – National Pollutant Discharge Elimination System – The NPDES permit program was established under Section 402 of the Clean Water Act, which prohibits the unauthorized discharge of pollutants from a point source (pipe, ditch, well, etc.) to U.S. waters, including municipal, commercial, and industrial wastewater discharges and discharges from large animal feeding operations.

OC Public Works – Orange County Public Works
OCSD – Orange County Sanitation District
OCWD – Orange County Water District
Outfall – Discharge point for water from the Resort.  Disneyland Resort has nine (9) legal discharge points known as Outfalls M‐001, M‐002, M‐003, M‐005, M‐5D, M‐5E, M‐6C, M‐22B, and M‐34A.

Outfall No. M‐001       Latitude 33°48'38"N, Longitude 117°55'26"W This discharge point is located at Disneyland at the intersection of Disneyland Drive and Magic Way.

Discharge at this outfall consists of wash water and storm water runoff from the west, south and north‐ central portions of Disneyland, including Adventureland, Frontierland, New Orleans Square, Critter Country, a portion of Fantasyland, and a portion of Main Street, and drainage from Rivers of America, Storybook, Jungle Cruise, Fantasia Gardens, Castle Moat, and Carnation Creek.

Outfall No. M‐002       Latitude 33°49'00"N, Longitude 117°55'12"W This discharge point is located at Disneyland southwest of Ball gate.  Discharge at this outfall consists of wash water and storm water runoff from the northern area of Disneyland, Toontown, and a portion of Fantasyland, and drainage from It’s a Small World, Toontown Lake, and Donald’s Pond.

Outfall No. M‐003       Latitude 33°48'43"N, Longitude 117°54'56"W This discharge point is located at Disneyland adjacent to Harbor Boulevard and northeast of the submarine filter plant.  Discharge at this outfall consists of wash water and storm water runoff from the eastern area of Disneyland, Tomorrowland, and a portion of Main Street.

Outfall No. M‐005       Latitude 33°48'35"N, Longitude 117°55'41"W Disneyland Hotel discharge point located on Cerritos Blvd.  The discharge at this point consists of storm water runoff.

Outfall No. M‐03A       Latitude 33°48'41"N, Longitude 117°54'56"W Drainage from Finding Nemo Submarine Voyage during rehab only.

Outfall No. M‐5D       Latitude 33°48'15"N, Longitude 117°55'19"W This discharge point is located along the southern portion of DCA near the California Screamin’ attraction.

Discharge at this outfall consists of wash water and storm water runoff, and drainage from a portion of Paradise Pier Lagoon.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09 PAGE 52
Outfall No. M‐5E        Latitude 33°48'15"N, Longitude 117°55'22"W This discharge point is located along the southwestern portion of DCA near the central maintenance facility.  Discharge at this outfall also consists of wash water and storm water runoff, and drainage from a portion of Paradise Pier Lagoon.

Outfall No. M‐6C        Latitude 33°48'23"N, Longitude 117°55'24"W This discharge point is located along the central and western portions of DCA near the security gate.

Discharge at this outfall consists of wash water and storm water runoff from Golden State, and drainage from a portion of Paradise Pier Lagoon.

Outfall No. M‐22B     Latitude 33°48'23"N, Longitude 117°55'21"W This discharge point is located along the northern and north‐central areas of DCA behind the Mulholland Madness attraction.  Discharge at this outfall consists of wash water and storm water runoff from Golden State, and Downtown Disney, and drainage from Disney’s Grand Californian hotel.

Outfall No. M‐34A       Latitude 33°48'15"N, Longitude 117°55'12"W This discharge point receives drainage from the majority of DCA (specifically the northeast and southeast portions) and is located near the coaster maintenance building.  Discharge at this outfall consists of wash water and storm water runoff from Sunshine Plaza, Hollywood, a portion of Golden State, and drainage from a portion of Paradise Pier Lagoon, Grizzly River Run, and Sun Icon Fountain.

Resort – The Disneyland Resort
RWQCB – Regional Water Quality Control Board – The Santa Ana Region extends from the San Bernardino and San Gabriel mountains in the north and east to Newport Bay along the coast.

SWPPP – Storm Water Pollution Prevention Plan – a principal requirement of storm water permits.  A SWPPP identifies all potential sources of pollution which may reasonably be expected to affect the quality of storm water discharges from the construction site.  It also describes practices to be used to reduce pollutants in storm water discharges from the construction site.

SWRCB – The California State Water Resources Control Board was created and given the broad authority and responsibility to protect water quality and balance competing demands on water resources.

Recirculating Water System – The interconnected water system which includes Rivers of America, Storybook, Jungle Cruise, Fantasia Gardens, Castle Moat, and Carnation Creek.

SPCC – Spill Prevention, Control and Countermeasure Plan – Development of a unique SPCC Plan requires detailed knowledge of the facility and the potential effects of any oil spill.  Each SPCC Plan, while unique to the facility it covers, must include certain standard elements to ensure compliance with the regulations.

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09
Appendix A: Identification of Illicit Connections Report Date Location Description of
Findings
Corrections
Made
Cast Member

ENVIRONMENTAL POLICY/PROCEDURE (Water) Doc #: SWPPP – R09 The Disneyland®
Resort
NPDES Storm Water Pollution Prevention Plan (SWPPP)
DLR NPDES SWPPP Revision 09
Appendix B: Significant Spills and Leaks Report
Date Location Description of
Spill / Leak
Corrections
Made
Cast Member

Disneyland Resort Master WQMP
Section 3: Post Construction BMP Methodology
LaRoc Environmental December 2014 – Final
Appendix 3‐G
LA County Stormwater BMP Operations
and Maintenance Manual
Disneyland Resort Master WQMP   Appendix 3‐G
December 2014  Page 1 of 1
LA County Stormwater BMP Operations and Maintenance Manual The purpose of including the LA County Stormwater BMP Operations and Maintenance Manual for the Disneyland Resort’s Master WQMP is to provide an additional resource for design criteria and guidelines for the development of stormwater treatment BMPs and guidance on the maintenance requirements for these BMPs.  Bold chapters below represent the most commonly used BMPs at the Resort. The organization of the manual is as follows:
 Chapter 1:  Summary of available options for stormwater treatment  Chapters 2 – 9:  Design specifications and maintenance guidance for treatment BMPs.  The BMP types applicable to the Resort are highlighted below.
o Chapter 2:  Dry Extended Detention Basins
o Chapter 3:  Vegetated Swales
o Chapter 4:  Filter Strips
o Chapter 5:  Bioretention
o Chapter 6:  Infiltration Facilities
o Chapter 7:  Stormwater Wetland Basins
o Chapter 8:  Sand Filters
o Chapter 9:  Proprietary Devices
 Chapter 10:  References
To access the manual, use the provided link:
http://dpw.lacounty.gov/ldd/publications/Stormwater%20BMP%20Design%20and%20Maintenance%20 Manual.pdf
LaRoc Environmental 4‐1  December 2014 –Final
4 Sub­Watershed BMP Plan

4.1 Introduction
A sub‐watershed infiltration BMP (sub‐watershed BMP) is an LID BMP that is: (1) located within the Disneyland Resort, (2) designed to capture and treat water at the sub‐watershed scale, and (3) not necessarily located within the footprint of a particular project.  The use of sub‐watershed BMPs can serve as a compliance option for priority projects to meet the new development and significant redevelopment program requirements of the Municipal Permit, the Model WQMP, and City requirements in a manner consistent with Resort‐specific opportunities and constraints.  Sub‐watershed BMPs allow the Resort to achieve equal or better water quality benefits in comparison to LID BMPs within each project footprint by allowing infiltration BMPs to be located where conditions are more favorable for infiltration and where the BMP can capture runoff from a larger tributary watershed.  As discussed in Section 3.5, when a sub‐watershed BMP is operational and has capacity available, a constrained project may choose to meet LID BMP requirements by participating in a sub‐watershed BMP rather than implementing LID BMPs within each project footprint.

In order to effectively implement sub‐watershed scale LID BMPs at the Resort, this “Sub‐Watershed BMP Plan” (Section 4 of this Master WQMP and associated appendices) has been developed.  This Sub‐ Watershed BMP Plan provides guidance and criteria for: (1) identifying high priority sub‐watershed BMP opportunities (Section 4.2), (2) developing sub‐watershed BMP projects (Section 4.3), and (3) utilizing and tracking sub‐watershed BMP capacity for projects that rely on these BMPs for compliance (Section 4.4).  As sub‐watershed BMPs are approved, constructed, and become operational, these BMPs will be incorporated into this section as the “living” portion of the Master WQMP Project Tracking Sheet (Appendix 5‐A).

4.1.1 How to Use this Section
This section can be used for a number of purposes including:
 Identifying and prioritizing sub‐watershed BMP opportunities (Section 4.2);  Developing sub‐watershed BMPs as standalone projects or as part of proposed development projects (Section 4.3); and
 Utilizing sub‐watershed BMPs to meet LID BMP requirements for a project (Section 4.4), including determining if sub‐watershed BMPs with capacity are available and documenting participation in these BMPs.

4.1.2 Regulatory Basis
The Orange County Municipal Permit and Model WQMP recognize that specific considerations apply to individual redevelopment projects within a larger site (Permit XII.B.2.a, Model WQMP 7.II‐1.2) and that numeric sizing criteria for a given redevelopment project are applicable only to the additional or replaced areas created by the project, rather than the entire site as a whole.  In the case of the Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐2  December 2014 –Final
Disneyland Resort, each redevelopment project represents a portion of the existing Resort site; therefore, numeric LID BMP sizing requirements apply only to the new or replaced areas.

The Model WQMP also recognizes that certain conditions (e.g., multiple benefits, groundwater recharge, space restrictions, redevelopment opportunities, economic considerations) may favor the implementation of LID principles and LID BMPs at a broader scale beyond the boundaries of a specific development project through the use of “regional or sub‐regional” LID BMPs (Model WQMP 7.II.2.4.3.2).

The large scale of the Disneyland Resort site presents an opportunity to use an approach that provides on‐site compliance solutions through sub‐watershed BMPs within the Resort site.

Finally, the Municipal Permit recognizes that there are constraining factors, including space restrictions associated with redevelopment projects, in‐fill projects, and high density development that create opportunities to incorporate LID principles into alternative programs including sub‐watershed management approaches (Permit XII.C.5).  Redevelopment at the Resort can be highly space constrained, so implementing sub‐watershed scale planning can help achieve additional LID benefits through retention and infiltration at the sub‐watershed scale rather than progressing through the hierarchy of LID options to the use of biotreatment at the project‐scale.

In summary, when appropriately implemented, a sub‐watershed BMP located within the Resort site and downstream of the development or redevelopment project(s) of interest can be used to fully meet LID BMP requirements in a manner consistent with the Model WQMP and Municipal Permit, and will provide equivalent stormwater treatment and water quality benefits.  This compliance pathway is introduced in Section 3.5 of this Master WQMP and is supported with guidance and criteria presented in this section.  This approach was conceptually approved by the Santa Ana RWQCB in the Disneyland Resort Sub‐Watershed Best Management Plan (BMP) Work Plan Acceptance Letter dated April 16, 2014 (Appendix 4‐C).

4.2 Identifying and Prioritizing Sub­Watershed BMP Opportunities Developing sub‐watershed BMPs requires conducting proactive sub‐watershed scale site planning and feasibility analyses of potential sub‐watershed BMP locations.  This section provides guidance for identifying and prioritizing sub‐watershed BMP opportunities at the Resort.  The purpose of this guidance is to assist Resort Cast Members and Resort contractors in identifying locations that are feasible for infiltration of stormwater on the Resort site and would provide strategic value in meeting LID requirements for future developments.  By virtue of their sub‐watershed‐scale application, these locations could be selected to accept runoff from multiple redevelopment projects.  After the potential locations are identified and prioritized, the high priority locations could be reserved for sub‐watershed BMPs, which would be implemented prior to the first redevelopment project within the sub‐watershed area that relies on them for compliance.  The timing and sequencing of actual construction of sub‐ watershed BMPs would be determined by Resort Cast Members depending on development projections and other factors.  An example of project sequencing and managing sub‐watershed BMP capacity is illustrated in Figure 4‐1.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐3  December 2014 –Final
Figure 4‐1
Illustration of Theoretical Sub‐watershed BMP Sequencing and Capacity Management

4.2.1 Sub­watershed BMP Identification and Prioritization Process Identification and prioritization of sub‐watershed infiltration BMPs can be done on an opportunistic, project‐by‐project basis, or may in the future be conducted as part of a structured planning process that could incorporate the following general steps:

1. Identify potential forecasted redevelopment projects within a planning time period as determined by the Disneyland Resort, including locations of these projects and potential project footprints and attributes.  Each of the identified projects should be evaluated to determine the footprint area, imperviousness, and other land use characteristics needed to determine: (1) how much LID DCV each would require, (2) whether each would be a constrained site that would benefit from a sub‐watershed BMP, and (3) when a sub‐watershed BMP would need to be completed in order to meet the needs of each project.

2. Conduct a proactive sub‐watershed‐scale site planning analysis that identifies opportunities and constraints for sub‐watershed BMPs.  This analysis would include review of forecasted development locations, underground utility corridors, existing building foundations, drainage pathways, Resort use (e.g. on stage, backstage), existing infrastructure, and other factors that relate to feasibility of stormwater infiltration.  For each of the candidate sub‐watershed scale BMP locations identified, an analysis considering the feasibility of siting the sub‐watershed scale BMP should be conducted following the infiltration feasibility guidance provided in Section 3.6 and the sub‐watershed BMP design guidance provided in Section 4.3.  This includes, but is not limited to, Resort maps, building plans, utility maps, topographical information, soil characteristics, storm drain locations, and input from Resort Cast Members on additional opportunities and constraints.
0 5
10 15
20 25
30 35
40 45
2013201420152016201720182019202020212022202320242025
Acres of Redevelopment, ac
Range of Potential
Development Forecasts
Excess Capacity Available (High
Development Scenario)
New Sub‐Regional BMP
Capacity
In‐Place Sub‐Regional BMP
Capacity (Utilized)
Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐4  December 2014 –Final

3. Based on the site planning analysis, identify locations for sub‐watershed BMPs that would be feasible and provide strategic value.  These locations would be downstream of forecasted redevelopment projects and feasible for construction of an infiltration system with capacity equal to at least minimum storage volumes for the participating redevelopment projects.  This step should include estimation of the type of the underground storage capacity available at the site so that it can be determined how much tributary area can be addressed in each BMP location.

4. Prioritize these sub‐watershed BMP opportunities relative to their strategic value and feasibility.

As part of this step, it may be necessary to develop conceptual designs of these facilities to the level of detail adequate to evaluate their feasibility, capacity, and cost.  Conceptual designs should be developed consistent with the design guidance provided in Section 4.3.

For each priority project, Appendix 4‐A may be used to assist with the evaluation of sub‐watershed BMP opportunities and constraints.  If high priority sub‐watershed opportunities are identified but not immediately implemented, Environmental Affairs will keep an inventory of potential locations so that these sites can be reconsidered in the future and potentially earmarked for this purpose.

4.2.2 Sub­Watershed BMP Prioritization Categories
Each of the potential sub‐watershed infiltration BMPs identified through the process above can be categorized as “high”, “medium”, or “low” priority to assist with selecting the most preferential sub‐ watershed BMPs.
 High priority locations are considered preferential and strategic due to the development site characteristics and the proposed location of the sub‐watershed BMP.  Characteristics of high priority locations include: adequate space for BMP within the proposed development project, soils with good infiltration capacity, do not pose a risk to adjacent structures/utilities, can readily tie into the storm drain system, and can provide treatment capacity for multiple up‐ stream priority projects.
 Medium priority locations may have certain factors that make them less desirable or strategically important than high priority locations.  For example, they may have a constrained available BMP footprint due to land use plan and/or proximity to building foundations/utilities, a more challenging connection to existing storm drain system, or not located at an opportunistic Evaluating Opportunities for Sub‐Watershed BMPs
when Planning for a Redevelopment Project
The early planning stages of a priority development project are a good time to evaluate whether a sub‐watershed BMP could be implemented as part of the project.  The redevelopment project and the sub‐watershed BMP could be implemented as part of the same permitting and design action.

The sub‐watershed BMP could address the project footprint in addition to developing surplus capacity for future projects with similar land uses.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐5  December 2014 –Final
location to provide treatment for multiple upstream priority projects.  Some of these locations may still be viable, but are considered medium priority due to these challenges.  Low priority locations are defined by significant constraining factors that make them likely infeasible.

4.3 Sub­Watershed BMP Development Process
Once the potential location for a sub‐watershed BMP has been identified and selected, there are eight main steps that need to be taken in order to effectively design and implement a sub‐watershed BMP, including the submittal of a Preliminary and a Final Project WQMP that documents the sub‐watershed BMP.  Table 4‐1 describes each of these steps and provides references to the locations in this Master WQMP where additional guidance is provided.

This process and the following sub‐sections are not intended to provide exhaustive design guidance.

Resort Cast Members and contractors working on sub‐watershed BMPs will need to incorporate site‐ specific information, engineering methods, and professional design judgment to develop designs that are safe, effective, and efficient for a given site.  The criteria and guidance presented in this section is intended to describe those features that are most important for the sub‐watershed BMP to serve its water quality function and comply with conditions of use for sub‐watershed BMPs.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐6  December 2014 –Final
Table 4‐1
Sub‐Watershed BMP Development Process
Step Purpose/Key Elements
Master
WQMP
Reference
Step 1: Conduct
preliminary site
assessment
 Conduct tests necessary to determine feasibility of location for sub‐watershed BMP implementation
 Estimate approximate area of BMP footprint and infiltration rate
 Determine conceptual connections to storm drain
Section 3.3
Step 2: Development
conceptual sizing and
design of sub‐
watershed BMP
 Confirm feasibility of preliminary or conceptual design, including integration with existing infrastructure and site uses  Estimate capacity of the sub‐watershed BMP
 Evaluate whether sizing is compatible with development forecast
Section 4.3.2
Appendix 4‐B
Step 3: Prepare
Preliminary Project
WQMP for sub‐
watershed BMP
 Present calculations and working design assumptions
 Submit to Environmental Affairs for internal Resort review, tracking, and verification of BMP credits
 Submit to City of Anaheim for review
Section 4.3.3
Appendix 3‐B
Step 4: Conduct
additional site
assessment activities,
as needed to support
final design
 Verify and/or update assumptions made in the Preliminary Project WQMP, including: infiltration rate, grading and BMP capacity, and storm drain system connections
Section 3.3
Section 4.3.2
thru 4.3.7
Step 5: Develop final
sub‐watershed BMP
sizing and design
 Provide details for diversion structure, pre‐treatment, other system components
 Develop construction‐ready plans and specifications
 Determine final capacity of sub‐watershed BMP
Section 4.3.2
thru 4.3.7
Appendix 4‐B.

Environmental
Operating
Guidelines for
Construction
Step 6: Prepare Final
Project WQMP for
sub‐watershed BMP
 Provide final design details and specifications for the BMP to comply with applicable requirements
 Provide O&M plans
 Submit for internal Resort review and then City of Anaheim review
Section 4.3.6
Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐7  December 2014 –Final
Step Purpose/Key Elements
Master
WQMP
Reference
Step 7: Install sub‐
watershed BMP to
meet conditions of
approval
 Construct sub‐watershed BMP per plans and specs
 Fulfill post‐construction inspection and verification; document as‐built condition
 Schedule/begin O&M activities
N/A (Resort
construction
management)
Step 8: Record
constructed sub‐
watershed BMP into
the Sub‐Watershed
BMP Plan and “BMP
Exchange Program”
 Incorporate final as‐built condition into Appendix 5‐A and map in Exhibit 5‐A.
 Document BMP capacity provided in BMP, portion of capacity used by development projects, and portion of capacity available for future development projects as part of the BMP Exchange Program (alternative compliance)
Section 5.2
Section 5.3
Appendix 5‐A

4.3.1 Step 1: Preliminary Site Assessment
The first step in the sub‐watershed BMP development process is to conduct a preliminary site assessment to identify potential locations for implementation of sub‐watershed BMPs, evaluate infiltration feasibility, approximate infiltration rate, and determine the project attributes.  Guidance for prioritizing sub‐watershed BMP locations is provided in Section 4.2 and introduces the factors that should be evaluated.  Guidance for conducting a site assessment is provided in Section 3.3 and 3.6 relative to BMP selection methods and feasibility criteria.

4.3.2 Step 2: Sub­Watershed BMP Conceptual Sizing and Design The sub‐watershed BMPs implemented at the Resort will typically be underground infiltration facilities (TGD Fact Sheet INF‐7) because of surface space constraints and the need to tie into sub‐surface storm drains at sub‐watershed BMP locations.  Fact Sheet No. 1, located in Appendix 4‐B of this Master WQMP, provides a Resort‐specific BMP fact sheet for underground infiltration BMPs, which has been modified from BMP Fact Sheet INF‐7 (Page XIV‐44) in the TGD.  The criteria in this fact sheet are considered to be recommended design criteria for all sub‐watershed BMPs implemented at the Resort.

If site‐specific conditions or factors require deviations from these criteria, these deviations can be approved with appropriate supporting documentation, at the discretion of the project engineer and the City of Anaheim.

Underground infiltration facilities are typically pre‐fabricated or cast‐in‐place structures, such as pipes, vaults, or modular structures, with open bottoms that are used to store runoff and percolate stormwater into the subsurface.  The specifications of each underground infiltration BMP configuration vary based on site constraints, feasibility and the type of design developed; however, the following design features are generally common across the proposed sub‐watershed BMPs at the Resort:
 Diversion structure (see below for details);
 Pre‐treatment BMP with access for maintenance (see below for details); Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐8  December 2014 –Final
 Underground structural storage features to provide retention storage (pipes, chambers, vaults, modular systems, gravel reservoir);
 Bedding layer below the storage layer for structural purposes and/or to provide a filtering layer for sediments;
 Compacted backfill above the structural elements to provide separation between the top of the infiltrating BMP and the finished surface above (parking lot, sidewalk, roadway, etc.);  Inspection ports or similar design features to provide verification of continued system performance and identify needs for maintenance; and
 Access ports, if feasibility, to allow for periodic removal of sediment.

Figure 4‐2 presents a sample cross section for an underground infiltration sub‐watershed BMP.

Figure 4‐2
Sample Sub‐watershed Infiltration BMP Cross Section
Selecting the Size of a Sub‐Watershed BMP
Sub‐watershed BMPs will typically be implemented as retrofit projects, based on the opportunities at a site.  As such, the sub‐watershed BMP does not necessarily need to be sized for full DCV of the entire tributary watershed; it simply needs to be sized to generate the amount of capacity that is anticipated to be used by future development projects.  The sizing of a sub‐watershed BMP should be determined based on:

1. Available area (i.e., how much volume can be provided?)

2. Tributary area (i.e., how much water is there to capture?) Infiltration of full diverted storage volume
Diversion
Structure
Developed
surface
Filter Course
Pretreatment
system
Storage Reservoir
Diversion
from storm
drain system
Observation Port
Access Port
(if feasible)
Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐9  December 2014 –Final

3. Demand for sub‐watershed BMP capacity (i.e., how much development is expected to occur within the sub‐watershed or in other constrained locations that may require BMP Exchange credits?)
The selection of an optimal size of a sub‐watershed BMP can be an iterative process that balances the three sizing factors listed above through achieving a large enough capacity to meet development project demands without inflating the size to unnecessarily occupy the entire available area when the full capacity will never be utilized.  For example, if the capacity created by the total available BMP footprint area far exceeds the required capacity from the tributary area and additional demand, the oversized BMP will never be fully utilized and will not be cost‐efficient.  Figure 4‐3 presents an example methodology that can be followed when iteratively sizing sub‐watershed BMPs with additional descriptions of each of the steps included below.

Figure 4‐3
Conceptual Sizing Process for Sub‐Watershed BMPs
StepA: Determine available
capacity ofsub‐watershedBMP
throughsite assessmentand
preliminary sizing
StepB: Determine equivalent
developable areathatmay be
treatedwiththat capacity (sqft)
StepC: Estimate demandfor
capacity insub‐watershedBMP
(tributaryprojects + BMP
Exchange) (sqft)
Capacity is adequately matched to estimated
demand
StepE: Move forward with
selectedBMP size
StepD:

Compare
StepB to
StepC
Capacity is much
largerthan
estimated demand
Capacity is much
lessthan
estimated demand
Potentially
reduce
capacity to
reduce project
costs
Look for
opportunities
to increase
capacity
Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐10  December 2014 –Final
Step A: Determine the initial available sub‐watershed capacity:

1. Determine the potential footprint (sq ft) that may be used for storage of stormwater runoff.

This does not include the space that may be required backfill, structural components, and required separation distances between underground storage modules/pipes/vaults.

2. Evaluate the volume available for storage (cu ft).  This can be accomplished by determining a depth of stormwater that will be stored by setting a desired draw down time or can be obtained from prefabricated structure specifications.  In both of these cases, the volume available is representative of the pore space only and does not include the gravel/rock drainage media.

Step B: Convert the volume capacity in the sub‐watershed BMP to equivalent treatable development area using the method below:

1. First, use the worksheet and method included in Fact Sheet No. 2, located in Appendix 4‐B, to estimate the capture efficiency of the provided volume.  This is a function of the tributary area, storage volume, and drawdown time.  The result is equal to the percent of long term runoff volume from the entire tributary sub‐watershed that is captured by the sub‐watershed BMP.

2. Next, the following equation can be used to determine the equivalent developable area that can be treated by a sub‐watershed BMP:

ATreat  =  ATributary ×  (Watershed % Capture) / 80%         Eqn 5.

Where:

ATreat = total treatable area (sq ft)
ATributary = total area tributary to the sub‐watershed BMP (sq ft) Watershed % Capture = as calculated in Step B.1
If the imperviousness of the tributary area is unknown at the time of sub‐watershed BMP sizing, a conservative estimation of 100% imperviousness should be used.

Step C: Estimate the capacity that will be needed in the sub‐watershed BMP by estimating the footprint of development anticipated to occur within the tributary sub‐watershed as well as the amount of BMP credits anticipated to be needed for alternative compliance through the BMP Exchange.  Both capacity and demand are expressed in terms of area of development.

Step D: Compare the total treatable area (ATreat) from Step B to the estimated demand from Step C.  If the total treatable area by the BMP is relatively well‐matched to the amount of development demand expected, then the size is approximately appropriate.  If the total treatable area by the BMP is much smaller than the anticipated development demand, then the storage volume of the sub‐watershed BMP should be increased to the extent Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐11  December 2014 –Final
feasible to provide additional capacity for treatment.  If it cannot be increased by a meaningful margin, then it may not be worthwhile to pursue this project further.  If the capacity of the sub‐watershed BMP is greater than anticipated development demands, the size of the BMP can be reduced.  This can help reduce construction and maintenance costs.

Step E: Once an acceptable sub‐watershed BMP capacity has been established, the design of the facility (Section 4.3.2) should be determined and the Preliminary or Final Project WQMP for the sub‐watershed BMP should be prepared (Section 4.3.3 or Section 4.3.6).

Diversion Structure Design Requirements
The diversion structure located up‐gradient from a sub‐watershed BMP is intended to divert water from the main Resort storm drain system that is to be treated into the sub‐watershed BMP, while allowing higher flows to bypass the BMP.  The design flow rate for the diversion structure should be set using flow‐based BMP sizing methods such that it provides at least the equivalent long term capture efficiency of the sub‐watershed BMP for its entire tributary area.  The worksheet and method included in Appendix 4‐B, Fact Sheet No. 2, should be used to estimate the capture efficiency of the sub‐watershed BMP.  Next, Appendix 4‐B, Fact Sheet No. 3, presents a Resort‐specific version of TGD Worksheet D to assist with determination of the design flow rate necessary to achieve at least this capture efficiency.

Engineering calculations and design of diversion structures to achieve the target diversion rate must be conducted as part of the BMP design.  Diversion structures must be designed as “cutoff” diversions such that no water should be allowed to bypass the diversion structure until the design flow rate is exceeded.

Pre‐Treatment BMP Requirements (Type and Size)
Pre‐treatment systems are strongly recommended for sub‐watershed BMPs to reduce sediment loading (including fine sediment removal), thereby reducing the risk of clogging that may reduce infiltration rates over time, ensuring BMP longevity, avoiding premature failure and reducing maintenance frequencies.  Any of the biotreatment and/or pretreatment/gross solids removal BMPs shown in the TGD Appendix XIV (BMP Fact Sheets), or equivalent alternatives, can be used as pre‐treatment.  The design flow rate for flow‐based pre‐treatment structures up‐stream of the sub‐watershed BMPs should be equivalent to that determined for the diversion structure as identified above.

Design Infiltration Rate
The design infiltration rate for sub‐watershed BMPs must be based on site‐specific testing under the supervision of a licensed geotechnical professional, with an appropriate factor of safety applied as part of the preliminary or comprehensive site assessments (Section 4.3.1 or Section 4.3.4).  TGD Appendix VII should be used to guide infiltration testing and TGD Worksheet H should be used to aid with selection of an appropriate factor of safety.  The design infiltration rate influences the capture efficiency of a sub‐ watershed BMP and must be used in calculating the drawdown time of the BMP for sizing and capture efficiency calculations.

4.3.3 Step 3: Prepare and Submit Preliminary Project WQMP for the Sub­Watershed BMP The Preliminary Project WQMP for the sub‐watershed BMP should contain a level of detail adequate to clearly demonstrate that the sub‐watershed concept and the BMP’s working assumptions will Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐12  December 2014 –Final
reasonably fit within the proposed site and will provide the necessary level of capacity.  Generally, the following should be shown:
 Sub‐watershed BMP location and tributary area delineation;  Development project characteristics and location;
 Footprint, conceptual cross section, and design volume shown on plans/exhibit;  Results of site assessment and basis for working design parameters, including design infiltration rate;
 Calculation of sub‐watershed BMP capacity as developable acreage; and  Conceptual flow paths and routing shown on plans/exhibit.

The Preliminary Project WQMP should be submitted using the Resort’s Project WQMP Template provided in Appendix 3‐C to satisfy the City’s Project WQMP requirements.  If the project is being installed entirely as a retrofit (and not part of a priority development project), then only the relevant sections of the Resort’s Project WQMP Template need to be completed.  The completed Preliminary Project WQMP along with BMP location map is forwarded to Environmental Affairs to review for compliance with this Master WQMP and logged into the Resort’s Master WQMP Project Tracking Sheet and BMP Exchange Spreadsheet (Section 4.3.8).  Environmental Affairs will use the Preliminary Project WQMP to provide a quality check on the project’s BMP selection, identify, verify and track any BMP Exchange credits or debits, and if approved, Environmental Affairs will return it to the project engineer with an updated Master WQMP Project Tracking Sheet for submittal to the City for review.

Preferably, the Preliminary Project WQMP for the sub‐watershed BMP should be prepared and forwarded to Environmental Affairs as early as possible in the design stage before extensive resources are used to finalize sub‐watershed BMP selection and prepare project design plans.  A Preliminary Project WQMP can be prepared during the advance conceptual stage of a project or in conjunction with less than or 30% design plans.  Internal review of the Preliminary Project WQMP by Environmental Affairs is critical in order to confirm the BMP credit “banking” and to minimize any City approval delays.

4.3.4 Step 4: Conduct Additional Site Assessment to support Final Design A comprehensive site assessment should be conducted to obtain any additional information needed to support the final sub‐watershed BMP design and preparation of the Final Project WQMP for the sub‐ watershed BMP.  Some information may have been collected during the preliminary site assessment (Section 4.3.1), in which case the accuracy should be verified and incorporated in the final design.  This additional site assessment information may include, but is not limited to, infiltration rate, final grading, sub‐watershed BMP capacity, and connections to the storm drain system.

4.3.5 Step 5: Develop Final Sizing and Design of Sub­Watershed BMP The sizing guidance in Section 4.3.2 should be used to verify and/or update the capacity and sizing of the sub‐watershed BMP following the site assessment conducted for final design.  At the final design phase, construction‐ready details and plans for each of the sub‐watershed system components should be provided, including the diversion structure, pre‐treatment, storm drain connection, and the sub‐ watershed BMP itself.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐13  December 2014 –Final

4.3.6 Step 6: Prepare and Submit Final Project WQMP for the Sub­Watershed BMP The Final Project WQMP for the sub‐watershed BMP requires additional detail, commensurate with final design documents that will be issued for construction and implementation.  In addition to the elements that need to be included in the Preliminary Project WQMP (Section 4.3.3.), the following additional elements are required for the Final Project WQMP:
 Verification or adjustment of preliminary assumptions made for the Preliminary Project WQMP – results of additional site assessment;
 Full design details and specifications;
 Project grading and drainage plans, drawn to scale and no less than 24X36” shall be included;  Current version of the BMP Exchange Spreadsheet (Section 5); and  O&M plan, including activities, responsibilities, and commitments to perpetual maintenance.

Additional information may need to be provided at the discretion of the designer and the reviewer.

Final sub‐watershed BMP design and sizing is based on the Preliminary Project WQMP when greater than 60% and/or 90‐100% design plans for the project are completed.  Final sub‐watershed BMP design and sizing may change slightly based on new information but should conform to the City’s requirements and the methodology presented in this Master WQMP.

The Final Project WQMP for a sub‐watershed BMP project must use the Resort’s Project WQMP Template (Appendix 3‐C) in order to receive approval.  The draft of the Final Project WQMP, as prepared for submittal and approval by the City of Anaheim, must be routed internally for concurrence by the various stakeholders.  The “internal use only” cover to the Resort’s Project WQMP Template in Appendix 3‐C includes the signature blocks for the stakeholders that must approve the scope of the WQMP and BMPs.  The project manager/engineer should route the draft Final Project WQMP to the distribution list and consider others, as appropriate for the project type, from the suggested distribution list at the bottom of the cover page.  The “internal use only” cover with signatures should be removed from the Final Project WQMP prior to submittal to the City, but included in the Environmental Affairs file copy.  At minimum, approval is required from:
 DLR Engineering Services,
 DLR Environmental Affairs, and
 DLR Architectural and Engineering.

4.3.7 Step 7: Install Sub­Watershed BMP to Meet Conditions of Approval Following approval of the Final Project WQMP, the sub‐watershed BMP should be constructed under the supervision of Facilities Asset Management per the plans and specifications that were approved in the final document.  The post‐construction inspection and verification activities should also be conducted to document the sub‐watershed BMP as‐built condition.  In addition, operations and maintenance activities should be scheduled and initiated.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐14  December 2014 –Final

4.3.8 Step 8: Incorporate Approved and Constructed Project WQMPs into Master WQMP The Master WQMP Project Tracking Sheet is maintained by Environmental Affairs and is used to track project review, routing and approvals, and to keep an inventory of all existing and proposed LID and treatment control BMPs.  The Master WQMP Project Tracking Sheet also tracks all BMPs added to the “BMP Exchange”, debits by Resort projects participating in sub‐watershed BMPs and/or the Resort BMP Exchange, and available credits for constrained projects.  The updated Master WQMP Project Tracking Sheet and BMP Exchange Spreadsheet are found in Appendix 5‐A.

The Master WQMP Project Tracking Sheet and BMP Exchange Spreadsheet are updated each time a Preliminary Project WQMP is received and approved by Environmental Affairs for each development/ redevelopment project.  The Resort sub‐watershed BMP map(s) are updated periodically, preferably every six to twelve months.

The Master WQMP Project Tracking Sheet serves to update the City of all development and redevelopment BMPs (proposed and existing) and is submitted with the Preliminary Project WQMP by the project engineer as part of the preliminary permitting packet.

The Master WQMP Tracking Sheet and BMP Exchange Spreadsheet are also updated with the sub‐ watershed BMP data per the Final Project WQMP approved by the City and any time a BMP is upgraded, replaced, removed, or otherwise modified.  Upon completion of construction, the project engineer or manager must complete the Project Close‐Out Form (Appendix 3‐E) in order to maintain an up‐to‐date BMP inventory.  This process allows the Resort to have centralized clearinghouse for BMPs and stormwater quality management.

4.4 Utilizing and Tracking of Sub­Watershed BMP Capacity The utilization and tracking of sub‐watershed BMP capacity is managed by Environmental Affairs as part of the BMP Exchange Program.  The surplus BMP capacity is tracked in square feet of area and by imperviousness of the total tributary area currently treated by the sub‐watershed BMP.  As new projects are developed that utilize capacity of the sub‐watershed BMP, the available capacity in the sub‐ watershed BMP must be adjusted accordingly.  Projects utilizing sub‐watershed BMPs must conform to the applicable requirements of Section 4.4.1 through 4.4.4, below.

4.4.1 Determining if a Sub­Watershed BMP is Available
A sub‐watershed BMP may only be used if it is constructed and operational prior to projects participating in it.  As sub‐watershed BMPs are approved and constructed at the Resort, they are entered into the BMP Exchange Spreadsheet and added to the Master WQMP BMP Location Map (Exhibit 5‐A).  These “living” documents will be updated by Environmental Affairs and can be used to evaluate whether a sub‐watershed BMP is downstream from a proposed development project and whether it has available capacity.

4.4.2 Conditions of Approval for Utilizing a Sub­Watershed BMP for LID Compliance A priority project that participates in a sub‐watershed BMP that is located downstream of the project and utilizes it as the compliance pathway (i.e., not alternative compliance) must demonstrate that all the following regulatory conditions of approval are met:

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental 4‐15  December 2014 –Final

1. The sub‐watershed BMP has capacity for all participating development projects and capacity is of similar type land use.  This is demonstrated by maintaining a current version of the BMP Exchange Spreadsheet (see Section 5) and showing that allocated capacity does not exceed available capacity.

2. The sub‐watershed BMP is located on the Resort site and located such that runoff from the project would be conveyed to the BMP prior to discharge from the Resort site.  The runoff may be conveyed directly if the BMP is located downstream or redirected to the BMP through pipes or other conveyance.  Each participating Project WQMP must demonstrate that it is within the tributary area to the sub‐watershed BMP.  Projects not located upstream but using a sub‐ watershed BMP would proceed to Section 5 and proceed according to the alternative compliance plan.

3. The sub‐watershed BMP provides equal or greater overall benefit than would be achieved by LID BMPs within the footprint of each redevelopment project that participates in this sub‐ watershed BMP.  By meeting conditions 1 and 2, an amount of water equivalent to the DCV is fully infiltrated in the BMP, therefore this requirement is met and nothing further needs to be demonstrated in this regard.

4. The sub‐watershed BMP is constructed and operational prior to occupancy of each project.  This is met by maintaining a current version of the BMP Exchange Spreadsheet (see Section 5).  Only completed and operational projects are to be shown in this spreadsheet, therefore only completed and operational projects are available to use for compliance.

5. The sub‐watershed BMP must be perpetually monitored and maintained for the life of the facility.   The monitoring requirements (which include a combination of visual inspections, sampling, testing or other quantitative measures), operation recommendations and maintenance requirements are development and included as part of the sub‐watershed BMP WQMP (see Section 4.3) through the development of the O&M plan specific to each facility.

4.4.3 Documenting Participation in a Sub­Watershed BMP for Sub­Watershed BMP Compliance
Priority projects that are proposed to utilize sub‐watershed BMPs for regulatory compliance are required to determine the capacity that they will require in the sub‐watershed BMP (Section 4.3.4) and document that this capacity is available for utilization through using the BMP Exchange Spreadsheet (Section 5).  An updated and current copy of the BMP Exchange Spreadsheet should be provided with the priority project’s Final Project WQMP.  Additional details regarding the BMP Exchange Program are provided in Section 5.

4.4.4 Documenting Participation in a Sub­Watershed BMP as an Alternative Compliance Approach
Sub‐watershed BMPs may be utilized as part of alternative compliance.  The requirements for utilizing a sub‐watershed BMP as alternative compliance, including documentation of capacity credits and debits and updating the BMP Exchange Spreadsheet, are presented in Section 5 of this Master WQMP.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental   December 2014 –Final
Appendix 4‐A
Sub‐Watershed BMP Opportunity
Identification and Prioritization
Worksheet
Disneyland Resort Master WQMP   Appendix 4‐A
December 2014  Page 1 of 2
Sub­Watershed BMP Opportunity
Identification and Prioritization Worksheet
Instructions to Preparer
When planning a redevelopment project, evaluate opportunities to implement sub‐watershed BMPs that could address the project of interest while generating excess treatment capacity. Excess capacity may be added as credit to the BMP Exchange and benefit future projects with constraints. Please complete and submit this worksheet to Environmental Affairs with the first draft of the Conceptual WQMP.

Step 1‐ Development Project Information
Project Name
Estimated Completion Date
Type of Redevelopment
Description:

Proposed Land Cover(s)
Estimated Total Project Surface Area (sq‐ft)
Estimated Impervious Surface Area (sq‐ft)
Step 2‐ Upstream Drainage Patterns + Opportunity for Sub‐Watershed BMP within Project Footprint Does a relatively large upstream tributary area drain through or adjacent to the development site? (typically to the same storm drain line) – circle answer Yes
No
If yes, indicate approximate tributary area draining through or adjacent to the development project site sq‐ft
If yes, what is the approximate depth below existing grade of the major storm drain system draining through the site ft Is there an area within the development project boundary for a sub‐watershed BMP that would not pose geotechnical concerns, detrimental impact on Resort's guest experience or on‐stage operations? – circle answer Yes
No
If yes to above, what is the estimated footprint available for sub‐watershed BMP (sq‐ft)? sq‐ft
If yes to above, what is the distance to existing storm drain system where the flow diversion would occur (ft) ft
Current/proposed land cover of sub‐watershed BMP
footprint
If the answer to both questions above is yes, then contact Environmental Affairs to determine if a sub‐ watershed opportunity should be pursued at this time.

Provide an exhibit(s) showing tributary area delineation, storm drain network, potential sub‐ watershed BMP location, and general site layout.

Disneyland Resort Master WQMP   Appendix 4‐A
December 2014  Page 2 of 2
Step 3‐ Downstream Drainage Patterns – Opportunity for Sub‐watershed BMP Downstream of Project Has the project conducted an analysis of opportunities for sub‐watershed BMPs downstream of the project? – circle answer
Yes
No
If no, then provide an exhibit(s) to Environmental Affairs showing the project location, storm drain network, and highlight the path that water takes after it leaves the project and before it discharges from the DLR site.  Environmental Affairs will screen potential sub‐watershed BMP sites to determine if any should be considered further.

If yes, is there an area within the DLR site and downstream of the project where a sub‐watershed BMP could be located (that would not pose geotechnical concerns, detrimental impact on Resort's guest experience or on‐stage operations)? – circle answer and complete the entries below Yes
No
Tributary area at the location of the sub‐watershed
BMP (ac) ac
Estimated footprint available for the sub‐watershed
BMP (sq‐ft) sq‐ft
Distance to existing storm drain system where the
flow diversion would occur (ft) ft
Depth of existing storm drain system where the flow
diversion would occur (ft) ft
Current/proposed land cover of sub‐watershed BMP
footprint
Provide an exhibit(s) showing tributary area delineation, storm drain network, potential sub‐ watershed BMP location, and general site layout.

Step 4‐Prioritization of Sub‐watershed BMP (to be completed by Environmental Affairs) What priority is the sub‐watershed BMP opportunity
(See Master WQMP Section 4.2.2)
Enter “X” to
designate choice
High priority, or preferential, sites are considered strategic and ideal due to upstream development forecasts and location of sub‐watershed BMP Medium priority, or feasible, sites are considered secondary sub‐watershed BMP locations due to site assessment factors that make them less desirable or strategically viable
Low priority sites were preliminarily identified with the potential to site sub‐ watershed BMPs but have been identified to contain site constraints or have significantly less capacity than other “high” or “medium” priority sites in the same watershed
Additional information, if needed:________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________ Prepared by:_____________________________________________________   Date:_______________ Attach exhibits to this worksheet.

Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental December 2014 –Final
Appendix 4‐B
Sub‐Watershed BMP Design Criteria
and Sizing Models Fact Sheets

Disneyland Resort Master WQMP   Appendix 4‐B
December 2014  Page 1 of 2            Fact Sheet No. 1
Appendix 4-B
Fact Sheet No. 1: Underground Infiltration BMP Fact Sheet Underground infiltration is a vault or chamber with an open bottom that used to store runoff and percolate into the subsurface. A number of vendors offer proprietary infiltration products that allow for similar or enhanced rates of infiltration and subsurface storage while offering durable prefrabricated structures. There are many varieties of proprietary infiltration BMPs that can be used for roads and parking lots, parks and open spaces, or mixed-use and commercial uses at the Disneyland Resort.

Feasibility Screening Considerations
 Underground infiltration basins shall pass infeasible screening criteria to be considered for use (Worksheet INF, Appendix 3-B.2)
 Feasibility screening shall be supported by a site-specific geotechical investigation and measurement of infiltration rates.

Opportunity Criteria
 Soils are adequate for infiltration or can be amended to provide an adequate infiltration rate.  Appropriate for sites with limited surface space.
 Can be placed beneath roads, sidewalks, parking lots, parks, and some commercial areas.  Potential for groundwater contamination can be mitigated through isolation of pollutant sources, pretreatment of inflow, and/or demonstration of adequate treatment capacity of underlying soils.  Tributary area land uses include mixed-use and commercial, roads and parking lots, and parks and open spaces. High pollutant land uses should not be tributary to infiltration BMPs.

Disneyland-Specific Design Criteria and Considerations
□ Placement of BMPs should observe geotechnical recommendations with respect to geological hazards (e.g. landslides, liquefaction zones, erosion, etc.) and set-backs (e.g., foundations, utilities, roadways, etc.)
□ Diversion structure located up-gradient from infiltration BMP should divert water from the main Resort storm drain system for flows to be treated, while allowing higher flows to bypass the BMP.
□
Pre-treatment of the diverted water shall be provided upstream of the infiltration facility, with access for maintentace. Water bypassing pre-treatment should not be directed to the facility. At a minimum, a pre-treatment BMP certified by the Washington State Department of Ecology for “Pretreatment” shall be used (e.g., Contech CDS system) (http://www.ecy.wa.gov/programs/wq/stormwater/newtech/technologies.html).

Disneyland Resort Master WQMP   Appendix 4‐B
December 2014  Page 2 of 2            Fact Sheet No. 1
□ The diversion structure and pre-treatment system shall be sized with adequate capacity to match the long term capture efficiency of the infiltration gallery. □
Underground infiltration should not be used for drainage areas with high sediment production potential unless preceded by a BMP that provides M or H level of treatment effectiveness for TSS. Preferrably, pre-treatmenbt systems for high sediment source areas should be certified by the Washington State Department of Ecology for “Basic Treatmet” (http://www.ecy.wa.gov/programs/wq/stormwater/newtech/technologies.html). □ Design infiltration rate should be determined as described in TGD Appendix VII. □ Underground structural storage features shall provide capacity for the design retention volume (pipes, chambers, vaults, modular systems, gravel reservoirs). □ A bedding layer below the storage layer is recommended for structural purposes and/or to provide a filtering layer for sediments.
□ Inspection ports or similar design features shall be provided to verify continued system performance and identify need for major maintenance.
□ Access ports, if feasible, should be provided to allow for periodic removal of sediment. □ For infiltration facilities beneath roads and parking areas, structural requirements should meet H-20 load requirements.

Computing Underground Infiltration Device Size
Underground infiltration BMPs vary by design and by proprietary designs. The sizing of the subwatershed infiltration BMP should follow the procedure described in Section 4.3.2 of this Master WQMP.  Volumetric computations shall be per the vendor specifications.  Infiltration rate and drawdown calcualtions shall be based on the design infiltration rate, with an appropriate factor of safety, per methods described in TGD Appendix VII and TGD Worksheet H.  Fact Sheet No. 2 in Appendix 4-B should be used to calculate the capture efficiency of the subwatershed BMP.  Fact Sheet No. 3 in Appendix 4-B should be used to calculate the required diversion flowrate for the diversion system and pre-treatment BMP.

Disneyland Resort Master WQMP     Appendix 4‐B
December 2014  Page 1 of 2  Fact Sheet No. 2
Appendix 4-B
Fact Sheet No. 2: Determining Capture Efficiency of Sub-Watershed BMPs Describe BMP Design Parameters
Determine the total effective storage volume provided in the BMP (pore space only; only include storage that is located at an elevation below the invert of the pipe from which water will be diverted), V
V= cu-ft
Determine the infiltrating footprint of the BMP, ABMP ABMP= sq-ft Determine site-specific observed infiltration rate below underground infiltration facility, Kobserved (Per methods approved in TGD Appendix VII or equivalent)
Kobserved = in/hr
Determine the appropriate factor of safety (FOS) (Per TGD Appendix VII and Worksheet H) FOS = unitless
Determine design infiltration rate below underground
infiltration facility, Kdesign
Kdesign = Kobserved / FOS
Kdesign = in/hr
Calculate Drawdown Time
Calculate the drawdown discharge rate of the BMP, Qinf
Qinf = ABMP × Kdesign /[ (12 in/ft) (3,600 sec/hr) Qinf= cfs Calculate the drawdown time of the BMP, T
T = V / (Qinf × 3600 sec/hr) T= hours
Determine BMP Volume as Effective Precipitation Depth
Determine tributary area to sub-watershed BMP, Atrib Atrib= sq-ft Determine the tributary area imperviousness to the subwatershed BMP(if the imperviousness of the tributary area us unknown, 100% should be used), imp
imp= %
Calculate the runoff coefficient for the tributary area, C C = 0.75×imp + 0.15 C=
Calculate the equivalent storm depth of the BMP (inches), d d= (V × 12 in/ft)/(C × Atrib) d= inches
Estimate Capture Efficiency from Nomograph
Use Figure below of the Master WQMP (also included
below) to estimate the long term capture efficiency of the subwatershed BMP using the design capture storm depth (d) and the drawdown time (T), %Cap
%Cap %
Disneyland Resort Master WQMP     Appendix 4‐B
December 2014  Page 2 of 2  Fact Sheet No. 2
Appendix 4-B
Fact Sheet No. 2: Determining Capture Efficiency of Sub-Watershed BMPs Estimate Developable Acreage Credit, sq-ft
Acredit = Atrib × (%Cap)/(80%) Acredit sq-ft
Graphical Operations
Disneyland Resort Master WQMP     Appendix 4‐B
December 2014  Page 1 of 2  Fact Sheet No. 3
Appendix 4-B
Fact Sheet No. 3: Sizing of Flow-Based BMPs
(Pre-Treatment BMPs and Diversion Structure)
Determine the required design intensity for flow-based sizing 1 Enter the time of concentration, Tc, to the point of diversion (See TGD Appendix IV.2) Tc= min
2 Determine the capture efficiency of the sub-watershed BMP Fact Sheet No. 2 (Appendix 4-B) %Cap= %
3 Use Figure 4-B.3 below to determine the design intensity required to achieve a capture efficiency equal to %Cap, Idesign Idesign= in/hr
Calculate the design flowrate for the diversion structure and pre-treatment system 1 Enter area tributary to subwatershed BMP, A (acres) A= acres 2 Enter imperviousness, imp imp= %
3 Calculate runoff coefficient, C= (0.75 x imp) + 0.15 C= 4 Calculate design flowrate, Qdesign= (C x Idesign x A) Qdesign= cfs Supporting Calculations
Describe system:

Provide time of concentration assumptions:

Disneyland Resort Master WQMP     Appendix 4‐B
December 2014  Page 2 of 2  Fact Sheet No. 3
Appendix 4-B
Fact Sheet No. 3: Sizing of Flow-Based BMPs
(Pre-Treatment BMPs and Diversion Structure)
Figure 4-B.3. Capture Efficiency Nomograph
Disneyland Resort Master WQMP
Section 4: Sub‐Watershed BMP Plan
LaRoc Environmental December 2014 –Final
Appendix 4‐C
Sub‐Watershed Best Management Plan
(BMP) Work Plan Acceptance Letter
Water Boards
Santa Ana Regional Water Quality Control Board
April16, 2014
Janina Jarvis
Manager, Environmental Compliance
[email protected]
Disneyland Resort
P.O. Box 3232
Anaheim, CA 92803-3232
.
.

EDMUND G. BROWN JR.

GOVERNOR
~ MATTHEW RODRIQUEZ l.."""-...
~
... ~ SECRETARY FOR

ENVIRONMENTAL PROTECTION

DISNEYLAND RESORT SUB-WATERSHED BEST MANAGEMENT PLAN (BMP) WORK PLAN
Late in 2013, Regional Board staff were approached by representatives from the Disneyland Resort to discuss a sub-watershed BMP approach proposed by Disneyland Resort. The SubWatershed BMP Plan that would be developed by Disneyland Resort would involve managing storm water runoff from the development of new projects within the Resort by using subgrade LID infiltration BMPs within the Disneyland Resort area, but not necessarily underlying the new projects. In subsequent conversations with Mr. Keith Linker, the Principal Engineer for the City of Anaheim, the City asked that Regional Board staff make a determination as to whether the proposed Disneyland Resort Sub-Watershed BMP Plan would represent an acceptable on-site stormwater management approach as described in the Orange County Municipal Separate Storm Sewer System (MS4) Permit (Order No. RB-2009-0030).

Regional Board staff have reviewed the concepts for post-construction infiltration BMPs proposed in "Disneyland Resort, Sub-Watershed BMP Work Plan" dated December 12, 2013. Board staff's comments respond to the project-specific Sections 3-5 and Appendices A & B of the submitted document and do not address the statements or conclusions presented in Section 2, Technical Background.

For post-construction storm water management, Disneyland Resort is proposing the implementation of on-site LID retention facilities at the sub-watershed scale. To implement this approach, it is Board staff's understanding that:
• The proposed LID infiltration BMPs would be used in areas of the Disneyland Resort site where a sub-watershed scale LID infiltration BMP would result in retention of an equal or greater volume of runoff on-site in comparison to LID BMPs implemented only within each project footprint, including consideration for protecting subsurface infrastructure (utilities, corridors and/or tunnels) and building/feature foundations. The Sub-Watershed BMP Plan will be used to augment a project-specific site planning process by identifying feasible sites for on-site storm water infiltration at the sub-watershed scale; • The proposed infiltration BMPs would be functional prior to occupancy of the area of new development or significant redevelopment;
WILLIAM RUH, CHAIR I KURT V. BERCHTOLD. EXECUTIVE OFFICER 3737 Ma1n St. Su1te 500. R1vers1de. CA 92501 1 www wat811)oards ca gov!santaana c') REC\CLED PAPER
Janina Jarvis
Disneyland Resort
- 2- April16, 2014
• Potential types of sub-watershed scale retrofit projects would include Site 2 (Walkway Expansion), Site 4 (Retail, Dining and Entertainment) and Site 5 (Lodging), as identified in the submitted document, however other similar sub-watershed scale retrofit projects that meet the applicable regulatory criteria could be identified as part of future planning activities and included as part of the Sub-Watershed BMP Plan;
• Maintenance schedules for the infiltration BMPs would be developed as specific plans for the implementation of BMPs are determined. At a minimum, the schedule should meet the requirements set forth in the current Model WQMP and must result in the continued proper operation of the units, but could be adapted with time and experience; and, • If excess treatment capacity results in a "BMP Credit", that capacity would only be used to offset treatment of runoff from areas with similar uses as those areas creating the credit.

Section XII.C.2 of the Orange County MS4 Permit requires priority development projects to retain the Design Capture Volume on-site to the extent feasible. Section XII.C.5 of the Orange County MS4 Permit states that in situations where constraints limit the implementation of LID BMPs, such as space restrictions, potential for impact of underground infrastructure in the immediate project vicinity, etc. inherent in some in-fill projects and redevelopment projects, LID principles could be integrated into a regional or sub-watershed management approach. The proposed approach for a Sub-Watershed BMP Plan would be consistent with both provisions.

Based on the submitted document, staff agrees that the conceptual approach presented in the December 12, 2013 sub-watershed BMP Work Plan for the Disneyland Resort meets the requirements of the current Orange County MS4 Permit and the County's current Model Water Quality Management Plan (WQMP). As allowed by the MS4 Permit, the Board defers to the City of Anaheim (City) for approval of the Resort's Sub-Watershed BMP Plan (and BMP retrofit projects to be identified therein) as the lead agency for post-construction BMP strategies and facilities within its jurisdiction. It is anticipated by Board staff that as additional details are established through the development and implementation of WQMPs for these projects, the City of Anaheim will provide the normal review, approval and inspection actions as needed to meet the requirements in the current and forthcoming Orange County MS4 Permits and the City of Anaheim Local Implementation Plans.

If you have any questions, please feel free to contact Hope Smythe at (951 )782-4493 ([email protected]) or you may contact Michelle Beckwith at (951)782-4433 (Michelle. Beckwith@waterboards. ca. gov).

Sincerely,
~v: 0/;tJ)
Kurt V. Berchtold
Executive Officer
cc: Rosanna M. Lacarra, LaRoe Environmental, [email protected] Jerry A. King, J.A. King & Associates, Inc., [email protected] Keith Linker, City of Anaheim, [email protected]
LaRoc Environmental 5‐1  December 2014 – Final
5 Alternative Compliance Plan

5.1 Purpose
Alternative compliance for LID BMP and treatment control BMP requirements may be needed in cases where site‐specific constraints do not allow for full implementation of the required LID BMPs and/or treatment control BMPs within the project footprint or in a sub‐watershed infiltration BMP downstream of the project.  In this case, the project must document this infeasibility and utilize alternative compliance options for the remaining DCV that could not be retained, biotreated, or treated by the project.  The Resort’s preferred method for alternative compliance is to participate in the Resort’s “BMP Exchange.”
This section describes the Resort’s BMP Exchange Program and provides guidelines for participating in the BMP Exchange to meet alternative compliance requirements.  The BMP Exchange provides a platform for Resort‐wide water quality management, and maintains a record of approved sub‐ watershed BMPs located within the Resort and the projects that have recorded a debit or have used credits from the BMP Exchange.  The BMP Exchange also establishes a system to track the surplus of treatment capacity available in other locations throughout the Resort and makes this surplus available as credits to projects that require alternative compliance.  The tracking spreadsheet for the BMP Exchange is part of the Master BMP Project Tracking Sheet located in Appendix 5‐A.

The bullets below provide guidance for using this section to answer three common questions:
 Is my project eligible for participation in the BMP Exchange?  Individual Project WQMPs should refer to the findings, procedures, and other guidance in Section 3 and Section 5.2.1 to demonstrate that the project is eligible to participate in the BMP Exchange.  How are credits generated for the BMP Exchange?  Credits (expressed in square feet of development) are generated by implementing BMP retrofits and/or providing excess capacity in BMPs installed as part of other projects.  Credits generated are documented for each project by completing the form found in Appendix 5‐B.  See Sections 5.3.2, 5.3.3, and 5.3.4 for guidance on calculating the quantity of credits generated by different types of BMPs.  How are credits utilized from the BMP Exchange?  Projects must first demonstrate that they are eligible to enter the BMP Exchange as discussed above.  An eligible project may utilize existing credits by documenting the debit and identifying the land use category.  The credit request from the BMP Exchange to offset the project’s debit is formalized by providing the completed form found in Appendix 5‐B.  Environmental Affairs will then update the BMP Project Tracking Sheet (Appendix 5‐A) with each Project WQMP submittal.  See Sections 5.2.3 and 5.3.6 for more guidance.  Figure 3‐4 in Section 3 provides a graphical representation of the concepts presented below.

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐2  December 2014 – Final

5.2 Alternative Compliance Process for Priority Projects This sub‐section presents a stepwise process for participation in alternative compliance.  The steps are described in the following sub‐headings and are illustrated in Figure 5‐1.

5.2.1 Step 1: Demonstrate Eligibility to Enter Alternative Compliance (BMP Exchange) The project applicant must first demonstrate in the Preliminary Project WQMP that the project is eligible to participate in the BMP Exchange.  This should be done by demonstrating that neither project‐based nor new sub‐watershed BMPs are feasible for the portion of the sizing obligation and that the project seeks to meet it with alternative compliance.  Sections 3 and 4 of this Master WQMP contain the site assessment process and sizing requirements for project‐based and sub‐watershed LID BMPs, respectively.  These sections also include feasibility criteria that should be used as a basis for demonstrating infeasibility and eligibility for participation in the BMP Exchange, where applicable.  If a project still has remaining sizing obligations after attempting to use LID BMPs and treatment control BMPs, then the project is eligible to enter the BMP Exchange and request credits for the remaining volume as specified in the following sections.  An explanation of eligibility must be provided in the Project WQMP, and should include one or more of the following factors, as applicable:
 Infiltration rate/geotechnical feasibility,
 Proximity to existing or proposed resort infrastructure (utility corridors, tunnels, building foundations, storm drain system, etc.),
 Impact on Resort activities and/or On‐Stage operations,  Impact on Resort guest experience and/or safety,
 Impact of operations and maintenance requirements,
 Space constraints, and/or
 Significantly greater water quality benefit through participation in the BMP Exchange.

Figure 5‐1 illustrates eligible pathways for entering alternative compliance and identifies the major steps required to participate in the BMP Exchange.

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐3  December 2014 – Final
Figure 5‐1
Alternative Compliance Assessment and Requirements Flow‐Chart

5.2.2 Step 2: Calculate Required Quantity and Type of BMP Exchange Credits Needed (Debits) for a Priority Project
BMP Exchange credits, expressed as a square footage of impervious surface1 , are the means by which
the Resort tracks BMP surplus capacity generated in Resort sub‐watershed BMPs.  In addition, the BMP Exchange is used to track the debits for priority projects that cannot satisfy LID and treatment control BMP requirements and have secured credits from the BMP Exchange.  The following steps are involved in calculating the quantity and type of BMP Exchange credits being requested by the project applicant.

For accounting purposes, a project requesting or needing credits from the BMP Exchange will calculate the development area in square feet not being treated by project BMPs as a debit for the project.

1. Calculate new or replaced impervious surface that requires treatment.  BMP Exchange credits are represented by a “developable area” in units of square footage of impervious surface.

2. Adjust for reduced imperviousness, if needed.  Nearly all projects within the Resort have a high degree of imperviousness; therefore a simple conservative method assumes that the number of BMP Exchange credits needed is equal to the total project area.  If a project has a significant

1 The BMP Exchange currency is square feet to facilitate management of credits and debits, but designers and engineers shall evaluate treatment BMP requirements as the DCV in cubic feet by following the methodology in Section 3.

Determine Project LID
BMP Requirements
and/or
Submit WQMP with Relevant Sections
Complete  to Document Compliance
(Sections 3, 4, and 5, as needed)
Yes
LID/Treatment
Control
Requirements
Met?
Participate  in Sub‐watershed
BMP, if Available (Section 4)
Provide Project‐based LID and/or
Treatment Control BMPs, per
Feasibility (Section 3)
No
Step 1: Demonstrate Eligibility
to Participate in Alternative
Compliance (Section 5.2.1)
Step 2: Determine Quantity and
Type of BMP Exchange Credits
Required (Section 5.2.2)
Step 3: Document Participation
in the BMP Exchange
(Sections 5.2.3, 5.3.6, and 5.3.7)
Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐4  December 2014 – Final
fraction of pervious surface, this area can be removed from the BMP Exchange credit request if it is designed to be self‐retaining (i.e., to produce no runoff during the 0.85‐inch storm event).

This can reduce the number of credits needed.  For example, if a project is 14,000 sq ft and includes 1,500 sq ft of landscape features that are enclosed within an elevated curb (i.e., that do not contribute runoff during the 0.85‐inch storm), then the total BMP Exchange credit needed (or the project’s debit) is 12,500 sq ft.  All priority projects must still meet source control and site design requirements.

3. Account for partial LID/treatment control requirements already met by the project.  If a project has been able to feasibly address a portion of the DCV via LID and/or treatment control BMPs, then the amount of BMP Exchange credit needed can be reduced by the fraction of the DCV already met by the project.  For example, if a project has captured 40 percent of the DCV within the project, then the total required BMP Exchange credit needed or project debit can be reduced by 40 percent.

4. Determine types of credits needed based on proposed surface types and uses.  There are two “surface type” groups within the Resort that are distinguished for the purpose of determining credit and debit types needed:
 Surface Type 1: Parking lots and similar areas with significant pollutant generating activities;
 Surface Type 2: All other impervious surfaces.

The project’s debit calculated in Steps 1, 2, and 3 should be subdivided based on the proportion of the untreated runoff originating from each of these surface type categories, and the debit in each category should be tracked separately.  A template worksheet for documenting calculation of the project’s debit by category is provided in Appendix 5‐B.

5.2.3 Step 3: Document Participation in Alternative Compliance (BMP Exchange) As will be discussed in Section 5.3, participation in the BMP Exchange requires the tracking of BMP Exchange credits and debits, and reporting to the City.  A current and updated copy of the Master WQMP Project Tracking Sheet should be attached as an appendix to each Project WQMP that involves generation or utilization of credits.  Section 5.3 provides details on how participation in the BMP Exchange must be documented.  All projects requesting to participate in the BMP Exchange must submit the Preliminary Project WQMP to Environmental Affairs to validate the availability of credit from the BMP Exchange and obtain an updated Master WQMP Project Tracking Sheet (Appendix 5‐A).

5.3 Resort BMP Exchange
This section describes the “rules of the road” for the Resort’s BMP Exchange.  The BMP Exchange Program consists of three primary elements, described in detail in the following sections.  These elements are:

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐5  December 2014 – Final

1. Criteria for generating and calculating BMP credits (Section 5.3.1, 5.3.2, 5.3.3, 5.3.4),

2. Requirements for utilizing BMP credits (Section 5.3.5), and

3. Requirements for tracking and reporting the BMP Exchange (Section 5.3.6).

Environmental Affairs is responsible for managing the BMP Exchange Program and maintaining the official version of the Master WQMP Project Tracking Sheet.

5.3.1 Options for Generating BMP Exchange Credits
In order to offset debits generated by projects with constraints, the BMP Exchange must have credits in the appropriate surface type requested (or better) available to use.  There are three options for generating surplus treatment capacity that may be utilized as BMP Exchange credit.  These options are:
 New capacity generated in retrofit BMPs across the Resort that are not located in a priority project area (Section 5.3.2);
 Excess capacity in BMPs within other new and significant redevelopment projects that have been sized and designed to treat additional area beyond that required for the respective project for which they were constructed (Section 5.3.3); and
 Excess capacity in a sub‐watershed BMP to which the project is not tributary (Section 5.3.4).

The referenced sections above provide guidance for generating and calculating BMP credits for each of these options.

5.3.2 Generating Credits through BMP Retrofits
BMP retrofits of areas outside of a priority project footprint (i.e., those not requiring treatment) offer opportunities to generate a surplus of treatment capacity for the BMP Exchange.  Retrofits for roofs and parking lots present the majority of the retrofit opportunities at the Resort.  Retrofit projects can be implemented as standalone efforts, or associated with a priority or non‐priority project as long as a WQMP is completed.  Priority projects with identified spatial or operational constraints can opt to consider retrofitting a comparable use area (roof, parking, etc.) at another location within the Disneyland Resort to generate BMP Exchange surplus capacity.  Once the BMP retrofit is completed, the surplus capacity can be added to the BMP Exchange and used to assist with compliance for the constrained redevelopment project.

In general, BMP retrofit opportunities include, but are not limited to:

Roof Downspouts – Downspouts from building roofs that are directly connected to the storm drain system may benefit from retrofitting them to drain to existing pervious areas (infiltration trenches, proprietary infiltration devices, or bioretention units).  These areas may also be candidates for Note:

If a project is tributary to a sub‐watershed BMP, then participation in that BMP is not considered alternative compliance and only Section 4 applies.

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐6  December 2014 – Final
redesigned landscaping that incorporates rainwater harvesting with rain gardens.  TGD Fact Sheets for Localized On‐Lot Infiltration (HSC‐1), Impervious Area Dispersion (HSC‐2), or Rain Barrels (HSC‐4) may be consulted for design guidance.

Walkways, Staging Areas, Parking, and Other Impervious Areas – Applies by converting impervious areas, such as backstage areas and parking lots, by retrofitting them with pervious materials like porous concrete or asphalt, or permeable pavers, either independently of other projects or as part of redeveloped or remodeled areas, if practical.  Remodeling does not require LID or treatment control BMPs to be incorporated and may offer additional opportunities for retrofit BMPs to augment the BMP Exchange by generating surplus capacity.  TGD Fact Sheet for Permeable Pavement (INF‐6) may be consulted for design guidance.

Catch Basins – The Disneyland Resort may retrofit catch basins with media filters.  The media and configuration options available for these proprietary devices allow for strategic implementation to address pollutants of concern specific to a site and can generate BMP surplus or offsets.  It should be noted that simple catch basin inserts (non‐media filtration type) do not address pollutants of concern for the Resort and are not capable of generating BMP credits.  TGD Fact Sheets for Catch Basin Planter Boxes (BIO‐7) or Cartridge Media Filters (TRT‐2) may be consulted for design guidance.

Landscape Retrofit and Re‐design (including infiltration design and/or efficient irrigation) – Landscaping currently in large raised and curved planter areas may be retrofitted with curb cuts and/or re‐designed and re‐graded to provide opportunities for infiltration and treatment.  Areas that can be retrofitted to provide equivalent treatment characteristics of vegetated swales, vegetated buffer strips, bioretention systems, infiltration trenches, or pervious areas may be able to provide BMP surplus or offset for other new or re‐development areas.  TGD Fact Sheet for Localized On‐Lot Infiltration (HSC‐1), Street Trees (HSC‐3), Infiltration Trench (INF‐2), Bioretention with no underdrain (INF‐3), Bioinfiltration (INF‐4), Bioretention with underdrains (BIO‐1), Vegetated Swale (BIO‐2), Vegetated Filter Strip (BIO‐3), Planting/Storage Media (MISC‐1), or Amended Soils (MISC‐2) may be consulted for design guidance.

Submittal Requirements for BMP Retrofits
BMP retrofits may be implemented as part of a priority project, a non‐priority project, or as a standalone effort.  If the retrofit is associated with a priority project, the BMP design and location should be documented as part of the Project WQMP, clearly indicating that the BMP is intended as a voluntary retrofit measure to generate excess capacity within the Resort, not as part of compliance for the priority project.  If the retrofit is proposed as a standalone effort and is not associated with a priority project, then an abbreviated Project WQMP should be compiled to present the BMP design details and specifications and the resulting equivalent BMP Exchange credits provided by the retrofit BMP.

Calculating Credits Generated by BMP Retrofits
The credits generated by retrofit LID BMPs can be calculated based on how large of an area it addresses.

For this option, it is assumed that the BMP is sized for the entire DCV for the area it addresses.  The tributary area must be subdivided into the two surface types of credits described in Section 5.3.5.  If the Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐7  December 2014 – Final
BMP is undersized relative to its tributary area, the methods used for sub‐watershed BMPs should be followed (Section 4.3.4) to estimate the credits generated.

5.3.3 Generating Credits through Treatment of Additional Area by Priority Project BMPs Priority projects at the Resort may design their project‐based LID and treatment control BMPs to accept runoff from a larger tributary area beyond the project footprint.  The additional area treated can be claimed as credit for the BMP Exchange.

Submittal Requirements for Surplus Treatment by Priority Project BMPs Priority projects are required to submit Preliminary and Final Project WQMPs, which will detail the design criteria and specifications for the LID and treatment control BMPs associated with the project.

Additional tributary area and associated capacity beyond that required to satisfy the regulatory criteria for the priority project itself should be clearly identified in the Project WQMP as being a voluntary treatment area.  This additional area can be entered into the BMP Exchange once the BMP is operational (Section 5.3.6 and 5.3.7).

Calculating Credits for Surplus Treatment by Priority Project BMPs The amount of credit generated is equal to the amount of additional voluntary area treated in the project BMPs.  The BMPs must be designed for the full DCV sizing criteria for all of the areas that they treat.  The surplus tributary area must be subdivided into the two surface types of credits described in Section 5.3.5.

5.3.4 Generating Credits through Surplus Capacity in Sub­Watershed BMPs Sub‐watershed BMPs may also generate credits to be used in alternative compliance for projects that are not located within the tributary area of the sub‐watershed BMP as shown in Figure 5‐2.  A sub‐ watershed BMP may be installed as a stand‐alone project or in conjunction with one or more priority projects to both offset debits from those projects and generate surplus credits.  The sub‐watershed BMP credits may be used to offset debits from one or more priority projects located outside the sub‐ watershed BMP’s tributary area.  Section 4.3.4 presents how to evaluate credits available in a sub‐ watershed BMP that will be tracked using the BMP Exchange (Section 5.3.6 and 5.3.7) and utilized by priority projects according to Section 5.3.5.

5.3.5 Utilization of BMP Exchange Credits
Participation in the BMP Exchange requires the tracking of BMP Exchange credits and debits, and reporting to the City.  The Resort’s Master WQMP Project Tracking Sheet serves as the primary basis for demonstrating that BMP Exchange credits are available for the project with a debit due to constraints or other factors and that credits are used appropriately.  Appendix 5‐A includes the Master WQMP Project Tracking Sheet for the Resort.

Utilization of Credits Across Similar or Lower Pollutant Generating Land Uses As embodied in the Master WQMP Project Tracking Sheet, BMP Exchange credits can be generated, tracked, and utilized in two categories of surface types based on the pollutants that they would be expected to generate.  These categories are:

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐8  December 2014 – Final
 Surface Type 1: Parking lots and similar areas with significant pollutant generating activities.

These areas typically generate a greater number and quantity of potential pollutant types, including metals, oils and greases, and trash/debris.
 Surface Type 2: All other impervious areas.

In utilizing credits, a simple rule must be followed: it is acceptable to utilize credits toward projects with an equivalent or lesser pollution generating type; however the inverse is not acceptable.  For example, credit generated by treating a parking lot (Surface Type 1) can be used to offset treatment debits for walkways or roof tops (Surface Types 2), however, a credit generated by treating a rooftop (Surface Type 2) cannot be used to offset treatment debits for a parking lot (Surface Type 1).  This concept of exchanging “down” ensures that the overall pollutant impact in storm water runoff to the environment from this exchange exercise is anticipated to be a net benefit or neutral.  The Master WQMP Project Tracking Sheet provides the ability to track each of these surface types.

Utilization of Credits Across Sub‐watersheds
Furthermore, credits can be utilized across sub‐watersheds within the Resort by following the principles laid out in this Master WQMP.  The Master WQMP Project Tracking Sheet (Appendix 5‐A) is designed to account for all BMP credits and debits across the Resort to ensure they are applied and accounted for appropriately.  As shown in Figure 5‐2, a new project site (light green) with constraints is planned in an existing drainage area (in orange) connected via a storm drain to the City’s storm drain system.  An already built project is located in the adjacent drainage area (in light blue) that is tributary to a sub‐ watershed BMP (dark blue) that has generated credits that have been noted in the Master WQMP Project Tracking Sheet.  The BMP Exchange has available credits to offset the light green project site that cannot accommodate LID or treatment BMPs.

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐9  December 2014 – Final
Figure 5‐2
Utilization of Credit Across Sub‐Watersheds

5.3.6 BMP Exchange Tracking Methodology
Any project site using the BMP Exchange, either generating or utilizing credits, shall document the credit or debit in the form in Appendix 5‐B and submit it for approval by Environmental Affairs.  Environmental Affairs will review the forms, verify the entries, and update the Master WQMP Project Tracking Sheet.

Environmental Affairs will provide the project’s proponent with an updated Master WQMP Project Tracking Sheet to include with the project’s WQMP for submittal to the City for review and approval.  As new projects generating credits or requesting offset of debits are submitted and approved by the City, Environmental Affairs will update and manage the surplus available in the BMP Exchange through the Master WQMP Project Tracking Sheet as part of maintaining the Master WQMP to keep it current and viable for the Resort.  A running total of credits and debits will be documented in the Master WQMP Project Tracking Sheet (Appendix 5‐A) for submission to the City whenever credits are generated or used.  Additionally, BMP locations should be added to Exhibit 5‐A.

Sub‐watershed BMP
Tributary Drainage Area
Project
Drainage
Area
Storm drain system
City storm drain system
Drainage flow direction
Sub‐watershed BMP
New Project
Site with
Constraints
Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental 5‐10  December 2014 – Final
The components that are required for tracking in the BMP Exchange for capacity generating projects include:
 Project Name,
 Project Location (latitude and longitude),
 DMA ID and Outfall Number,
 BMP Type, Volume, and Footprint,
 Proprietary Manufacturer and Model, if applicable,
 BMP Drainage Area and Land Use Type,
 BMP Exchange credits generated and Surface Type, and
 Project WQMP number in which the credits were documented.

The components that are required for tracking in the BMP Exchange for priority projects using available credits include:
 Project Name,
 Project Location (latitude and longitude),
 Project Area to Be Treated and Land Use Type,
 Outfall Number, and
 BMP Exchange Credits Required and Surface Type.

In the event that the Municipal Permit and/or DAMP are modified, and new standards or requirements are put in place that change the required level of treatment of stormwater (for example) or create a conflict with the current methodology described in this section, the Resort shall evaluate the existing credit in the BMP Exchange and reassess it relative to the new standards or requirements.  The Resort shall communicate its findings to the City and propose additional or revised methodology and/or a revised “currency” for the BMP Exchange, with appropriate translators or adjustment factors for the pre‐existing credit, for the City’s review and approval.

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental   December 2014 – Final
Appendix 5‐A
Master WQMP Project Tracking Sheet

BMP Exchange Tracking Form (Post-2014) Revision Date: 1/19/2015 Priority Project Name Project WQMP # DMA ID Status
Completion Date. List
chronologically. Estimated
future completion date for
planned projects
Previously Submitted
and Reviewed?
(update for each new
submittal)
DMA Area (sq-ft) DMA Impervious Area (sq-ft) Surface Type 1 Impervious Area (sq-ft) Surface Type 2 Area Impervious Area (sq-ft) Credits Utilized? (Y/N) Surface Type 1 Credits Utilized (sq-ft) ADebit1 Surface Type 2 Credits Utilized (sq-ft) ADebit2 Credits Generated? (Y/N) Type of Credit Generating Project. Retrofit, excess area treated, subwatershed BMP BMP ID Generating Credits Surface Type 1 Credits Generated (sq-ft) ACredit1 Surface Type 2 Credits Generated (sq-ft) ACredit2 Surface Type 1 Available Credits (sq-ft) AAvailable1 Surface Type 2 Available Credits (sq-ft) AAvailable2 Surface Type 1 Credits (sq-ft) TotA1 = AAvailable1 + ACredit1 + ADebit1 Surface Type 2 Credits (sq-ft) TotA2 = AAvailable2 + ACredit2 + ADebit2 Example 1
(Excess Area - Credit Generated) 1-A
Constructed and
verified 5/12/2014 Approved 100,000 90,000 50,000 40,000 N 0 0 Y Retrofit 1-A-Bioretention 4,000 2,000 0 0 4,000 2,000 Example 2
(Project as a partial Debit offset by
the Exchange) 2-B
Constructed and
verified 7/1/2014 Approved 12,000 9,000 - Y 9,000 0 -1,000 N - - - - 4,000 2,000 4,000 1,000 Example 3 (Standalone Retrofit) 3-A Constructed and verified 8/22/014 Approved 8,000 7,500 7,500 - N 0 0 Y Retrofit 3-A-Bioretention 7,500 - 4,000 1,000 11,500 1,000 Example 4
(Project has full Debit offset by the
Exchange) 4-C
Submitted for
City Approval 12/21/2014 New, for approval 5,000 5,000 5,000 - Y -5,000 0 N - - - - 11,500 1,000 6,500 1,000 DCA BOH Bldgs 2,4 & 6 2009-00485 DB-005 Constructed and verified 10/6/2009 Approved - - - 0 0 Y Excess Area Porous Pavement 313 - 0 0 313 - Fantasyland BOH 2010-00508 DB-001 Constructed and verified 8/1/2010 Approved Y Retrofit Infitlration 1,445 313 - 313 1,445 Fantasyland BOH 2010-00508 DB-001 Constructed and verified 8/1/2010 Approved Y Retrofit Filtration 1,979 313 1,445 313 3,424 Pongo Lot 2008-00476 Dist. 25 Constructed and verified 1/4/2010 Approved Y Excess Area Infitlration 213,880 313 3,424 214,193 3,424 Buzz Lot 2008-00476 Dist. 25 Constructed and verified 1/4/2010 Approved Y Excess Area Filtration/ Infiltration 312,325 214,193 3,424 526,518 3,424 DLH Central Improvement Area 2011-005011 DB-002 Constructed and verified 11/1/2011 Approved Y Excess Area Biofiltration/ Infiltration 2,437 526,518 3,424 526,518 5,861 Consolidated Security and
Emergency Operations Center Pending Unknown Design/Permits Pending Submitted Y Excess Area 526,518 5,861 526,518 5,861 526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861
526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861526,518 5,861 526,518 5,861 Project/DMA Tracking DMA Characteristics Credit Utilization (Debits) Credit Generation or Banking Credit Availability (Calculated) BMP Exchange Balance (Calculated) BMP Exchange Balance for all projects. Cannot
be negative at any time. Tracks the credits generated for the BMP Exchange. Attach Worksheet 5-B.2 for each project or DMA Tracks the debits to the BMP Exhange for project
not meeting the DCV. Attach Worksheet 5-B.1 for
each project or DMA. Enter as a negative number.

One line for each DMA. If there are multiple DMAs per project, use one line per DMA. Include only DMAs that either utilize or generate credits Include general characteristics for each DMA
Credit available for use by project.

Running total based on previous project
debits and credits.

Disneyland Resort Master WQMP December 2014 Page 1 of 1 Appendix 5‐A Revision Date: 10/11/2014
BMP
Surplus
No. Project Name
Disney
Division
Project
Location
(Resort Park
& Area)
Project Site
Size (acres)
Disney
Drainage
Area Outfall No. Development Type Project Status
Project Status
Date
Date
Construction
Completion
Priority
Project Type Pollutants
BMP or LID
Surface Area
Balance (sq ft)
Amount
Remaining -
Balance (sq ft)
LID or BMP
Name
Proprietary
Manufacturer
and Model Notes
1 DCA BOH Bldgs 2,4 & 6 DCA BOH 2 DB-005 CP-005 Significant Redevelopment
In Operation 10/6/2009 10/6/2009 Parking Lot/
Restaurant
Sediments, Heavy Metals, Organic Compounds, & Bacteria & Viruses. 3,696 514
313
Porous
Pavement
NA Porous Pavement in excess of min. required.
1/4/2010 Used for Little Mermaid, remainder: 514 sf. 7/1/14 Used 201 sf for Main Street Bypass, remainder: 313 sf. 2 West Side Diner DCA BOH 0.31 DB-002 CP-002 Restaurant In Operation 10/26/2009 4/1/2010 Exempt. <5K Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides. 5,365 0 Infiltration Dry
Well
NA Infitration of roof top and walkway, patio areas.
7/1/14 Used 5,365 sf for Main Street Bypass, remainder: 0 sf. 3 Little Mermaid DCA DCA 0.07 DB-002 CP-002 Significant Redevelopment
In Operation 6/1/2011 5/1/2011 >5K New
Impervious
Debris, Sediment, Oils, trash, nutrients.
(3,182) - Porous
Pavement
NA BOH and walkway not subject to treatment.

Surplus from DCA BOH used.
4 Fantasyland BOH Disneyland BOH 0.033 DB-001 CP-001 Restaurant; Exempt (<5K)
In Operation 8/1/2010 8/1/2010 New
Impervious (Roof)
Heavy Metals, sediment, trash, bacteria/viruses, oil/grease, nutrients, pesticides. 1,445 1,445 Infiltration
Trench
NA Infitration of roof top areas.
5 Fantasyland BOH Disneyland BOH 0.045 DB-001 CP-001 Restaurant; Exempt (<5K)
In Operation 8/1/2010 8/1/2010 Heavy Metals, sediment, trash, bacteria/viruses, oil/grease, nutrients, pesticides.
1,979 1,979 Drain Inserts Smart Sponge
or comparable
Drain Insert to be installed to existing drain inlets and treat the surface area 1,979 sf. 6 SP-9 Surface Parking Lot
(Pongo Lot)
Other Resort 4.91 (City
Drainage Dist. 25)
Orangewood
Avenue-Harbor
Blvd
Significant Redevelopment
In Operation 3/1/2010 1/4/2010 Parking Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease. 213,880 213,880 Infiltration Basin
7 SP-9 Surface Parking Lot
(Buzz Lot)
Other Resort 7.17 (City
Drainage Dist. 25)
Orangewood
Avenue-Harbor
Blvd
Significant Redevelopment
In Operation 3/1/2010 1/4/2010 Parking Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease. 312,325 312,325 Infiltration Trench and Infiltration Basin. 8 Cars Land DCA DCA 13.346 DB-005 CP-005 Significant
Redevelopment
Under Construction 4/30/2010 Est. 2012 Commercial
>100
Debris, Sediment, Oils, trash, nutrients
(15,075) 0 Infiltration Basin Runoff in BOH area 50, 760 sf not treated due to site restrictions. 35,685 sf outside the limit of disturbance tributary to and treated by the basin. Assume credit taken from DLH Central Area Improv. 9 DLH Central Area
Improvement
Downtown Disney

4.32 DB-002 CP-003 Significant
Redevelopment
In Operation 9/20/2010 11/1/2011 >5K New
Impervious
Heavy Metals, sediment, trash, bacteria/viruses, oil/grease, nutrients, pesticides. 23,760 2,437 Infiltration
Trench,
Vegetated Buffer
Strips, Drain
Insert
Impervious walkways and pool deck not subject to treatment directed to BMPs- infiltration trench, vegetated buffer strips with drain inserts. Remainder: 2,437 sf 11 Castle Fantasy Faire Disneyland On Stage 0.386 DB-006 M-001 Significant Redevelopment
In Operation 9/10/2013 7/5/1905 >5K New
Impervious
SuspSolids/Sediment, nutritents, heavy metals, bacteria/virus, pesticides, oils, toxic org, trash and debris (6,248) - None Runoff not treated due to utilities, constraints, foundations. WQMP claimed credit from DLH Central Area Improvement. 12 Main Street Bypass Disneyland On Stage 0.128 DB-006 34A Significant Redevelopment
Under Construction 7/1/2014 Expected
11/1/2014
>5K New Impervious
Heavy Metals, sediment, trash, bacteria/viruses, oil/grease, nutrients, pesticides. (5,566) - None Runoff not treated due to utilities, constraints, foundations. WQMP claimed credit from DCA BOH Bldgs 2,4 & 6 (201 sf) and West Side Diner (5365 sf).

BMP Exchange Tracking Form (Pre-2014)
END OF PRE-2014 BMP EXCHANGE SEE POST-2014 FOR BALANCE AND PROJECTS AFTER JAN. 1, 2015
Disneyland Resort Master WQMPDecember 2014 Page 1 of 1 Appendix 5‐A Treatment and LID BMP Inventory Revision Date: 10/11/2014 Map Site
ID No Project Name
Disney
Division BMP
Proprietary
Manufacturer
and Model
Disney ID
No.

Project Location
(Resort Park & Area) Latitude Longitude
Project Site
Treatment Area
Size (acres)
Disney
Drainage Area Outfall No. Development Type Priority Project Type City Permit No. Project Status Project Status
Date
Construction
Completion Date Pollutants
Total LID Surface
Area (sq ft)
BMP Exchange
Surplus Link Notes
Disneyland Resort Central
Bakery
Other Infiltration Trench No Disneyland 0.28 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 12/26/2008 Completed Sediments, Heavy Metals, Organic Compounds, & Bacteria & Viruses NA NA Located at the West parking area, an infiltration trench with a 24" CMP Perforated embedded inside.

Disneyland Resort Central
Bakery
Other Porous Landscape Detention -
Bioretention Cell
No Disneyland 0.28 Significant
Redevelopment
Parking Lot/
Restaurant
In Operation 12/26/2008 Completed Sediments, Heavy Metals, Organic Compounds, & Bacteria & Viruses NA NA The Western portion of the planter along the North and South sides of the building will be constructed as a bioretention cell.

Disneyland Resort Central
Bakery
Other Porous Pavement Detention/
Porous AC
No Disneyland 0.28 Significant
Redevelopment
Parking Lot/
Restaurant
In Operation 12/26/2008 Completed Sediments, Heavy Metals, Organic Compounds, & Bacteria & Viruses NA NA Located at the parking area located at the East Building front entrance.

Disneyland Resort Central
Bakery
Other Media Filter Drain Insert Yes Disneyland 0.28 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 12/26/2008 Completed Sediments, Heavy Metals, Organic Compounds, & Bacteria & Viruses NA NA Unit Location: Installed at the Catch Basin in the West parking area. Roof drains at the Northeast and Southeast building corners are fitted with downspout filters.

Disney Grand Californian Hotel
Expansion
Downtown Disney Vegetated (Grass) Swales No Downtown Disney 2.88 DB-002 CP-002 Significant Redevelopment
Commercial >100 In Operation 12/26/2008 10/6/2009 Heavy Metals (Copper, Lead, Nickel) NA NA Roof Runoff will be collected by downspouts and tied into a private storm drain line that will convey runoff into the vegetated swale.

Disney Grand Californian Hotel
Expansion
Downtown Disney Storm System Interceptor Yes Downtown Disney 2.88 DB-002 CP-002 Significant Redevelopment
Commercial >100 In Operation 12/26/2008 10/6/2009 Heavy Metals (Copper, Lead, Nickel) NA NA Unit Location: Installed at the inlet of the private 24" storm drain system. Per inspection unit is located in landscape area adjacent to garage entrance (3/8/2010).

Disney Grand Californian Hotel
Expansion
Downtown Disney Ultra Urban Inlet Filter Yes Downtown Disney 2.88 DB-002 CP-002 Significant Redevelopment
Commercial >100 In Operation 12/26/2008 10/6/2009 Heavy Metals (Copper, Lead, Nickel) NA NA Unit Location: Installed at the Catch Basin at entrance driveway to the Subterranean parking area (3/8/2010)
Disney Grand Californian Hotel
Expansion
Downtown Disney Minimize Impervious Area No Downtown Disney 2.88 DB-002 CP-002 Significant Redevelopment
Commercial >100 In Operation 12/26/2008 10/6/2009 Heavy Metals (Copper, Lead, Nickel) NA NA Portions of the roof and hardscape will drain to landscaped areas or a vegetated swale.

Disney Grand Californian Hotel
Expansion
Downtown Disney Minimize DCIA No Downtown Disney 2.88 DB-002 CP-002 Significant Redevelopment
Commercial >100 In Operation 12/26/2008 10/6/2009 Heavy Metals (Copper, Lead, Nickel) NA NA Landscaping and walkways on south side of building (3/8/2010).

Disney Grand Californian Hotel
Expansion
Downtown Disney Create "Reduced" or "Zero
Discharge" Areas
No Downtown Disney 2.88 DB-002 CP-002 Significant
Redevelopment
Commercial >100 In Operation 12/26/2008 10/6/2009 Heavy Metals (Copper, Lead, Nickel) NA NA Portions of the roof and hardscape will drain to landscaped areas or a vegetated swale.

C
Buena Vista Street - Entry, Hub DCA Storm System Interceptor StormCeptor STC7200DCA 2.29 DB-005 CP-005 Significant Redevelopment
>5K New Impervious WQMP Approved.

Construction
scheduled.
9/8/2009 est. 9/2011 Trash, debris, sediment, nutrients NA StormCeptor installation near or at SMH-329-DCA (Near North corner of Bldg. #450- It's Tough to be a Bug).

DCA BOH Bldgs 1,2, 4 and 6 BOH Catch Basin Insert (2) - Bldg 1 Yes DCA 0.2 DB-005 CP-005 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

NA NA
DCA BOH Bldgs 1,2, 4 and 6 BOH Vegetated (Grass) Swale (Bldg 2 , 4 and 6) to treat roof and
loading dock runoff
No DCA 0.81 DB-005 CP-005 Significant
Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

NA NA
DCA BOH Bldgs 1,2, 4 and 6 BOH Porous Pavement Detention/ Porous AC (Bldg 2, 4, 6) for
impervious areas (roof and
sidewalk)
No DCA 0.15 DB-005 CP-005 Significant
Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

NA 1 Excess area of porous pavement added to this project towards BMP surplus DCA BOH Bldgs 1,2, 4 and 6 BOH Rain Diversion Valve Vaults Yes DCA DB-005 CP-005 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed NA NA
DCA BOH Bldgs 1,2, 4 and 6 BOH Rain Diversion Valve Vaults Yes DCA DB-005 CP-005 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

NA NA
DCA BOH Bldgs 1,2, 4 and 6 BOH Trash Packer Clarifier Yes DCA DB-005 CP-005 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

NA NA
DCA BOH Bldgs 1,2, 4 and 6 BOH Sediment/Oil Interceptor (2) Yes DCA DB-005 CP-005 Significant Redevelopment
Parking Lot/
Restaurant
In Operation 10/6/2009 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

NA NA
SP-9 Surface Parking Lot Other Pervious pavement No Off-site 7.5 (City Drainage Dist. 25)
Orangewood Avnue-Harbor Blvd Significant
Redevelopment
Parking Lot CUP-2008-05390; OTH 2008-0476 In Operation 1/4/2010 Mar-10 Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease.
326,700 NA Estimated size 7.5 to 8.55 acres. Final BMP size to be verified.

SP-9 Surface Parking Lot Other Vegetated (grass) swale No Off-site 2.4 or 3600 lf (City Drainage Dist. 25)
Orangewood Avnue-Harbor Blvd Significant
Redevelopment
Parking Lot CUP-2008-05390; OTH 2008-0476 In Operation 1/4/2010 Mar-10 Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease.

NA NA BMP size is cumulative and estimated
SP-9 Surface Parking Lot Other Infiltration Trench No Off-site 1.45 (City Drainage Dist. 25)
Orangewood Avnue-Harbor Blvd Significant
Redevelopment
Parking Lot CUP-2008-05390; OTH 2008-0476 In Operation 1/4/2010 Mar-10 Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease.
63,162 NA BMP size is cumulative and estimated
SP-9 Surface Parking Lot Other Infiltration Basin No Off-site 10.08 (City Drainage Dist. 25)
Orangewood Avnue-Harbor Blvd Significant
Redevelopment
Parking Lot CUP-2008-05390; OTH 2008-0476 In Operation 1/4/2010 Mar-10 Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease.

NA NA Basin capacity is 29.0 Ac ft. 11.4 ac ft detention capacity estimated for project footprint. Detention basin includes 0.25 ac ft sediment forebay.

SP-9 Surface Parking Lot
(Pongo Lot)
Other Infiltration Basin No Off-site 4.91 (City Drainage Dist. 25)
Orangewood Avnue-Harbor Blvd Significant
Redevelopment
Parking Lot CUP-2008-05390; OTH 2008-0476 In Operation 1/4/2010 Mar-10 Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease.

NA 213880 Pongo was a pre-existing lot that is now treated by the infilration basin. 7 SP-9 Surface Parking Lot
(Buzz Lot)
Other Infiltration Trench and Infiltration
Basin
No Off-site 7.17 (City Drainage
Dist. 25)
Orangewood Avnue-Harbor Blvd Significant
Redevelopment
Parking Lot CUP-2008-05390; OTH 2008-0476 In Operation 1/4/2010 Mar-10 Heavy metals, Organic Compounds (including hydrocarbons), trash and debris, oil and grease.

NA 312325 Buzz was a pre-existing lot that is now treated by both an infiltration trench and infiltration basin.
2 West Side Dinner BOH Infitration - Dry Well No DCA 0.1 DB-002 CP-002 Restaurant Exempt (<5K) GRA2009-02795 In Operation 4/1/2010 Completed Heavy Metals (Copper, Lead, Nickel), sediment, trash, bacteria/viruses, oxygen demanding subst., oil/grease, nutrients, pesticides.

0.04 2 Infitration trench/dry well. Credit Memo Submitted (10/26/09).

Little Mermaid DCA Media Filter Drain Insert Yes - Kristar FloGard
Downspout Filter
DCA 0.21 DB-002 CP-002 Significant
Redevelopment
>5K New Impervious GRA2009-02791; OTH 2009-00498 In Operation 7/18/2011 May-11 Debirs, Sediment, Oils 0.21 NA Northern portion of building roof. Downspout filtration followed by infiltration well Little Mermaid DCA Infitration - Dry Well No DCA 0.21 DB-002 CP-002 Significant Redevelopment
>5K New Impervious GRA2009-02791; OTH 2009-00498 In Operation 7/18/2011 May-11 Debris, Sediment, Oils 0.21 NA Northern portion of building roof. Pretreatment by downspout filters prior to infiltration.

Little Mermaid DCA Infiltration - Dry Well YesStormChamber (10 units)
DCA 0.45 DB-002 CP-002 Significant
Redevelopment
>5K New Impervious GRA2009-02791; OTH 2009-00498 In Operation 7/18/2011 May-11 Debris, Sediment, Oils, trash, nutrients 0.45 NA Southern portion of building, queue area, and BOH road. Catch basin as forebay for sediment (incl. nutrients and oils), debris and trash removal.

Little Mermaid DCA Pervious pavement No DCA 0.04 DB-002 CP-002 Significant Redevelopment
>5K New Impervious GRA2009-02791; OTH 2009-00498 Under Construction 7/18/2011 May-11 Oil, grease, sediment 0.04 NA Partial BOH Road. Pervious concrete used.

Festival Arena Back-of-House DCA Infiltration Trench No DCA 0.073 DB-001 CP-001 Significant Redevelopment
>5K New Impervious na Completed 1/13/2010 Aug-10 Heavy metals, Organic Compounds, sediments, trash and debris, oil and grease. 0.109 NA roof drains to infiltration trench Festival Arena Back-of-House DCA Undreground Infiltration Basin No DCA 0.083 DB-001 CP-001 Significant Redevelopment
>5K New Impervious na Completed 1/13/2010 Aug-10 Heavy metals, Organic Compounds, sediments, trash and debris, oil and grease. 0.088 NA Hardscape to inlets with filters and to underground infiltration basin.

Fantasyland Back-of House DCA Infiltration Trench No DCA 0.033 DB-001 CP-001 Restaurant Exempt (<5K) na Completed 2/5/2010 Aug-10 Heavy Metals, sediment, trash, bacteria/viruses, oil/grease, nutrients, pesticides. 0.033 2 infiltration trench to treat building roof area (1,445 sf), Fantasyland Back-of House DCA Drain Insert Yes - Smart
Sponge or
comparable
DCA 0.045 DB-001 CP-001 Restaurant Exempt (<5K) na Completed 2/5/2010 Aug-10 Heavy Metals, sediment, trash, bacteria/viruses, oil/grease, nutrients, pesticides. 0.045 2 Drain Insert to be installed to existing drain inlets and treat the surface area 1,979 sf.

Credit Memo Submitted (02-05-2010)
10 World of Color DCA Storm System Interceptor Yes DCA 1.08 DB-002 CP-002 Significant Redevelopment
>5K New Impervious GRA 2008-02716 Completed 3/4/2010 Jun-10 Sediments, trash and litter, nutrients (landscaping) - NA StormCeptor Model STC 900.

Cars Land DCA Roof Downspout Filter Yes - Kristar
FloGard
Downspout Filter
DCA 1.3 DB-005 CP-005 Significant
Redevelopment
Commercial >100 GRA2009-02805; GRA2009-02782; GRA2009-02769; OTH 2009-00503
Under Construction 4/30/2010 Est. 2012 Heavy metals, organic compounds, sediment, trash and debris, bacteria/viruses, oil/grease, nutrients, pesticides.

1.3 NA Roof of facility. Runoff will be pre-treated by ten (10) downspout filters and then directed to two (2) infiltration basins.

Cars Land DCA Vortex Separator Yes - StormCeptor
(4 units)
DCA 6.036 DB-005 CP-005 Significant
Redevelopment
Commercial >100 GRA2009-02805; GRA2009-02782; GRA2009-02769; OTH 2009-00503
Under Construction 4/30/2010 Est. 2012 Heavy metals, organic compounds, sediment, trash and debris, bacteria/viruses, oil/grease, nutrients, pesticides.

6.036 NA Remaining onstage areas will be treated by four (4) Stormceptor units.

Cars Land DCA Grease Separator No DCA 2.319 DB-005 CP-005 Significant Redevelopment
Commercial >100 GRA2009-02805; GRA2009-02782; GRA2009-02769; OTH 2009-00503
Under Construction 4/30/2010 Est. 2012 Heavy metals, organic compounds, sediment, trash and debris, bacteria/viruses, oil/grease, nutrients, pesticides.

2.319 NA Located to the east of the ride track. Runoff from the ride track will be pre-treated by grease separator then pumped to the infiltration pit.

Cars Land DCA Infiltration Pit No DCA 2.319 DB-005 CP-005 Significant Redevelopment
Commercial >100 GRA2009-02805; GRA2009-02782; GRA2009-02769; OTH 2009-00503
Under Construction 4/30/2010 Est. 2012 Heavy metals, organic compounds, sediment, trash and debris, bacteria/viruses, oil/grease, nutrients, pesticides.

2.319 NA Triangular shape, located to the east of the ride track. Runoff from the ride track will be pre-treated by grease separator prior to being pumped to the infiltration pit.

Cars Land DCA Infiltration Basin No DCA 2.288 DB-005 CP-005 Significant Redevelopment
Commercial >100 GRA2009-02805; GRA2009-02782; GRA2009-02769; OTH 2009-00503
Under Construction 4/30/2010 Est. 2012 Heavy metals, organic compounds, sediment, trash and debris, bacteria/viruses, oil/grease, nutrients, pesticides.

2.288 NA Two (2) infiltration areas located under the rock work to the east and to the northwest of the ride facility. Pretreatment by downspout filters prior to infiltration. A portion of the Back of House road and a tributary area off the project site will also be directed to infiltration basin 1 for treatment.

DLH Central Area Improvement Downtown Disney Infiltration Trench NA Disneyland Hotels 0.637 DB-002 CP-003 Significant Redevelopment
>5K New Impervious GRA2010-02840, OTH 2010-02840 Under Construction 6/30/2010 Nov-11 Sediment, trash, bacteria/viruses, nutrients, pesticides. 27,760 3,830 DLH Central Area Improvement Downtown Disney Vegetated Buffer Strips/ Drain Insert
Drain Insert -
AbTech Ultra
Urban Filter
Disneyland Hotels 0.599 DB-002 CP-003 Significant
Redevelopment
>5K New Impervious GRA2010-02840, OTH 2010-02840 Under Construction 6/30/2010 Nov-11 Sediment, trash, bacteria/viruses, nutrients, pesticides. 26,100 19,930 Vegetated Buffer Strips flow into Drain Insert Filters D
Paradise Pier Dining Area -
Area Development
DCA Storm System Interceptor Various - see
notes
DCA 1.422 DB-002 CP-002 Significant
Redevelopment
>5K New Impervious &
Restaurant
GRA2010-02825; OTH2010-00517 Under Construction 6/30/2010 Jun-11 Sediment, nutrients, trash, debris,metals, oils, grease and organics. 0 0 One new Stormceptor (Model STC 900 or equivalent) was added to the project site.

Two existing Stormceptors, same model, where existing and continued in use (See Items No. 19 and 20 with Disney ID No. DCA-7 and DCA-8, respectively). 8 9
A
B
1 3
4 5
6 Disneyland Resort Master WQMP
December 2014 Page 1 of 1 Appendix 5-A
Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental December 2014 – Final
Exhibit 5‐A
Master WQMP BMP Location Map
Santa Ana Freeway
DB-005
DB-001
DB-002
DB-003
DB-004
CP-OO5
CP-OO4
CP-OO2
5D
5E
003
CP-OO6
CP-OO1
002
CP-OO3
001
005
22B
6C
34A

OUTDOOR

VENDING
BLDG.

WESTSIDEDINNER
15 CENTRAL BAKERY
DCA PRODUCTIONKITCHEN ENTERTAINMENT (S-19, POLARIS) CMF WEST

CUSTODIAL
BLDG.

FESTIVAL
ARENA

FANTASYLAND
#*
#*
#*
#*
X
X
%
")
")
")
")
X
#*
#*
#*
%%%%
#
#
#*
%
X%
#*%
!<k!<!<k
#*
#*
#*
#*
#*
#*#*#*#*#*
X
X
k
k
kk
#*!<
#
#
#
#
#*
#*
#*#*
#*#*
")
%
E
EXIBIT 5-A
Disneyland Resort
Drainage
Basins and
Treatment BMP's
Compass Rose GIS October 9, 2014
200 100 0 200 400
FEET
1 inch = 450 feet
Legend
( Connection Point
) Sampling Point
% Dry Well
)" Infiltration Trench
<! Oil/Water Separator
% Porous Pavement Detention
k Rain Diversion Valve# Vegetated (Grass) Swales
Drainage Basin
"JDetention Basin
!CInfiltration Basin
*# Drain Inlet/Downspout Filter
Dynamic Separator
(Storm Ceptor) k
X Underground Filtration Basin

Disneyland Resort Master WQMP
Section 5: Alternative Compliance Plan
LaRoc Environmental December 2014 – Final
Appendix 5‐B
BMP Exchange Calculations Worksheets
Disneyland Resort Master WQMP     Appendix 5‐B
December 2014  Page 1 of 3
Appendix 5-B.1: Credit Utilization (Debits) - BMP Exchange Calculations Step 1: Determine the BMP Exchange Credits Required (Debits) for a Priority Project 1 Determine the new or replaced impervious surface that requires treatment, Aimp
AImp= sq-ft
2 Determine the percentage of the surface area of the project that is already addressed by LID/Treatment Control BMPs, if applicable, %Treated
%Treated
= %
3 Determine the remaining BMP Exchange Credits that are remaining after accounting for LID/Treatment Control BMPs, ARemain
ARemain=AImp*(1- %Treated)
ARemain= sq-ft
4 Determine the types of credits needed (ADebit1 or ADebit2) based on the distribution of the proposed land uses of impervious area for ARemain:

Note: ADebit1 + ADebit2 must equal ARemain
1) Surface Type 1:

Parking lots, roadways, and similar activities with significant traffic and/or other significant pollutant generating activities. ADebit1= sq-ft 2) Surface Type 2:

Other surface types. ADebit2= sq-ft

Disneyland Resort Master WQMP     Appendix 5‐B
December 2014  Page 2 of 3
Appendix 5-B.2: Credit Generation - BMP Exchange Calculations Step 1: Determine Type of Alternative Compliance BMP Generating Credits 1 If a retrofit or new BMP is not located in a priority development project area and is proposed to generate
BMP credits (Section 5.3.2) then…
Go to Step 2.
2 If a BMP is designed to treat additional area beyond that required for the project and BMP credits are generated
(Section 5.3.3) then…
Go to Step 3.
3 If BMP credits are generated by a sub-watershed BMPs
(Section 5.3.4) then…. Go to Step 4.

Step 2: Simple Retrofit BMP Credits Created by Full Sized Retrofit BMPs

2.1 Determine the area tributary to the retrofit BMP, Atrib Atrib= sq-ft

2.2 Is BMP sized for DCV required to meet LID requirements for the entire tributary area?
Use Resort Sizing Factor Approach, Simple DCV
approach, or 80% capture method (Section 3.7)
Circle one: Yes
No
DCV= cu-ft

2.3 If no, then upsize the BMP, reduce the tributary area to meet full DCV sizing, or calculate credits following Step 4, below

2.4 If yes, the credits created by the retrofit BMP are equivalent to the tributary area (Atrib), ACredit
ACredit= sq-ft

2.5 Determine the types of credits created based on tributary land uses of impervious area:

Note: ACredit1 + ACredit2 shall equal ACredit
1) Surface Type 1:

Parking lots, roadways, and similar activities with
significant traffic and/or other significant pollutant
generating activities.

ACredit1 = sq-ft
2) Surface Type 2:

Other surface types.

ACredit2 = sq-ft
Step 3: Additional Tributary Area Treated in Full Sized Priority Project BMPs

3.1 Determine the new or replaced impervious area tributary to the Priority Project BMP that requires treatment, Atrib_req Note: tributary area shall include run-on areas to be treated by the proposed BMP
Atrib_req sq-ft

3.2 Determine the excess impervious area tributary to the Priority Project BMP that requires treatment, Atrib excess Atrib_excess sq-ft

3.3 Determine the total area tributary to the Priority Project BMP, Atrib where Atrib = Atrib_req + Atrib_excess
Note: Include new and replaced impervious area and as
noted above, run-on from other areas not already treated Atrib= sq-ft
Disneyland Resort Master WQMP     Appendix 5‐B
December 2014  Page 3 of 3

3.4 Is BMP sized for DCV required to meet LID requirements for the entire tributary area (Atrib)?
Use Resort Sizing Factor Approach, Simple DCV
approach, or 80% capture method (Section 3.7)
Circle one: Yes
No

3.5 DCV= cu-ft

3.6 If no, then upsize the BMP, reduce the tributary area to meet full DCV sizing, or calculate credits following Step 4, below

3.7 If yes, then BMP Exchange Credit is equal to the excess area treated (Acredit = ATrib excess) ACredit= sq-ft

3.8 Determine the types of credits created based on tributary land uses of impervious area:

Note: ACredit1 + ACredit2 shall equal ACredit
1) Surface Type 1:

Parking lots, roadways, and similar activities with
significant traffic and/or other significant pollutant
generating activities.

ACredit1 = sq-ft
2) Surface Type 2:

Other surface types.

ACredit2 = sq-ft
Step 4: Surplus Capacity in Sub-Watershed BMPs and Undersized Retrofit BMPs

4.1 Determine the area tributary to the sub-watershed BMP, Atrib
Atrib= sq-ft

4.2 Use Appendix 4-C.2 to determine the capture efficiency of the sub-watershed BMP, %Cap %Cap= %

4.3 Calculate the total credits created by the sub-watershed BMP using the following equation:

ACredit = Atrib × (%Cap)/80%
Acredit= sq-ft

4.4 Determine the types of credits created based on tributary land uses of impervious area:

Note: ACredit1 + ACredit2 shall equal ACredit
1) Surface Type 1:

Parking lots, roadways, and similar activities with
significant traffic and/or other significant pollutant
generating activities.

ACredit1 = sq-ft
2) Surface Type 2:

Other surface types.

ACredit2 = sq-ft
Appendix H-2
Hydraulics Report

TECHNICAL

MEMORANDUM
3737 Birch Street, Suite 250, Newport Beach, CA 92660 949.428.1500 www.ardurra.com Hydraulic Analysis
Subject Hydraulic Analysis for Disneyland Forward
Client Anaheim Public Utilities
Prepared By JiaJia Huang, P.E.

Reviewed By Shyamala Raveendran, P.E.

Date June 5, 2023

PURPOSE
The City of Anaheim (City) retained the service of Ardurra to perform a hydraulic analysis for the proposed Disneyland Forward Project within the Disneyland Resort Area (DRA) to identify any water system improvements needed to accommodate ultimate growth of DRA.

DISCUSSION
The water hydraulic scenarios were analyzed under Peak Hour Demand (PHD) condition and Maximum Day Demand plus Fire Flow (MDD + FF) condition:
• Scenario 1: Currently entitled land use in DRA
• Scenario 2: Modified land use as part of the Disneyland Forward Project The hydraulic analysis was performed using the City’s future (2040) system model developed as part of the 2020 Water Master Plan (WMP). Psomas, the Developer’s consultant, provided demand allocation information for Scenario 1 and Scenario 2 and was included as Attachment A. The provided demand information was used to update the demand allocation within the DRA in the model. In addition, the City developed its 2020 Urban Water Management Plan (UWMP) post completion of the 2020 WMP which includes updated future water demand forecasts. The 2040 demand set in the model was updated so that the total demand of DRA and the remaining areas is consistent with the 2040 systemwide demand projected in the 2020 UWMP.

The 2040 system was analyzed under MDD extended period simulation (EPS), and was evaluated at peak hour demand (Hour 5). The 12-inch main that bisects Disneyland between Disneyland and California Adventure Park between Disneyland Dr and Harbor Blvd is assumed to be abandoned.1 Model results were checked against City’s Design Guidelines, as summarized in Table 1.

Table 1. City Design Guidelines2
Pressure Requirements
Demand Condition Min. Pressure (psi)
PHD 45
MDD + FF 20
Velocity Requirements
Demand Condition Water Main Type Max. Velocity (fps)
PHD
Transmission 5
Distribution 5
MDD + FF Transmission 5
Distribution 10
1 This line is in private property and will be a maintenance challenge as the City has limited access. 2 Source: Anaheim Public Utilities Water Services Administrative Procedures and Design Guidelines dated June 2020 June 5, 2023

Page 2 of 8 ends