Cities Index.
31b. Draft Subsequent Environmental Impact Report No. 352 Volume 2

Anaheim City Council
April 16, 2024

Document
31b. Draft Subsequent Environmental Impact Report No. 352 Volume 2
Meeting
April 16, 2024
Body
Anaheim City Council
Pages
764
Original file
285.6 MB
Text extracted from the city's file for reading and search. Open the original on local.anaheim.net. That file is the official record.

This District is intended to accommodate Theme Park uses consisting primarily of ticket/entry areas, dining, retail and entertainment facilities, support back-of-house service facilities (maintenance, accessory uses, and staging areas), and associated administration facilities as well as hotels and accessory uses as identified on Exhibit 3.3a (The Disneyland Resort District/Overlay Summary Tabulation – Maximum Allowable Development) of the Specific Plan and as set forth herein. (Ord. 5580 § 11; October 22, 1996.)
.010 Theme Park - Permitted Primary Uses and Structures. Subject to the limitations prescribed in Section 18.114.050 (Land Use and Site Development Standards - General) and in accordance with the Design Plan, the following buildings, structures and uses shall be permitted in this District:
.0101 Theme Park. A commercial establishment which includes entertainment facilities of a regional significance and may include ancillary or incidental facilities, such as plazas, streets, walkway promenades, marinas, lakes, parks, and other landscaped open space areas, and rest areas, and which may charge a fee for admission. The following facilities may be included within a Theme Park:
.01 Amphitheaters, indoor and outdoor.
.02 Amusement devices and/or arcades.
.03 Auditoriums.
.04 Dance floors.
.05 Fireworks (location and time subject to approval of the Fire Department), provided no aerial fireworks shall be launched within approximately 1,300 feet of the eastern side of the ultimate right-of-way of Walnut Street. .06 Outdoor special light effects including, but not limited to, sky beacons, floodlights of the thematic element and other theme park structures, search lights, laser light shows, fireworks, and other similar lighting effects intended primarily for entertainment of The Disneyland Resort visitors and not as an advertising display.
.07 Retail shops.
.08 Restaurants - enclosed, outdoor dining, satellite, or walk-up. .09 Theaters - includes dinner, legitimate or motion picture theaters and performance theaters or clubs.
.10 Theme park attractions. A building, structure, improvement, device, mechanism, or other facility or combination thereof operated for the entertainment of visitors in a theme park. Such facilities may include, but are not limited to: roller coasters, amusement rides, water rides, monorails, shows The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-32
(live, automated or motion picture), displays, museums, art galleries, auditoriums, pavilions, or zoos.
.11 Outdoor stands and booths.
.0102 Hotels. Up to a maximum of five thousand six hundred (5,600) hotel rooms or guest suites subject to the limitations prescribed in subsection 18.114.050.020 (Limitation on Total Number of Hotel Guest Rooms or Suites).
.0103 Retail Entertainment Centers.
.0104 Transportation Facilities.
.0105 Vacation Ownership Resorts in compliance with Section 18.114.120 (Requirements for Vacation Ownership Resorts) and Section 18.114.050.020 (Limitation on Total Number of Hotel Guest Rooms or Suites). (Ord. 6093 § 2; January 29, 2008.) .020 Permitted Accessory Uses and Structures. The following accessory uses may be conducted where clearly incidental to and integrated with a permitted primary use:
.0201 Theme Park Accessory Support Facilities. A building, structure, device, mechanism, or other facility or combination thereof which supports and is consistent with the intent of the operation of a theme park. Such facilities may include, but are not limited to:
.01 Administrative offices including temporary offices within existing hotel buildings during construction period only and subject to approval of the City Traffic and Transportation Manager for parking layout and vehicular access. .02 Alcoholic beverages, On-Sale.
.03 Animal storage facilities. An establishment in which six (6) or more dogs or other domesticated animals are housed, groomed or temporarily boarded. Such facilities shall be limited strictly to the use by guests and patrons of a Theme Park and/or for use in the Theme Park and must be located a minimum of fifty (50) feet from any residential zone.
.04 Automobile/vehicle parking lots or structures providing off-street parking spaces, as required by this chapter for uses permitted under this Section and subject to approval of the City Engineer for vehicular access and Planning Director for parking layout.
.05 Banking facilities, including automated teller machines. .06 Child day care services intended for the use of theme park employees. .07 Emergency medical facilities.
.08 Employee dressing room and rest areas.
.09 Mechanical equipment.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-33
.10 Movie and theatrical production facilities within a theme park. .11 Repair facilities for vehicles and attractions.
.12 Signs as permitted pursuant to Section 18.114.130 (Sign Regulations). .13 Staging areas.
.14 Storage facilities provided they shall not be visible from a point six (6) feet above ground from an adjacent public right-of-way or any adjacent or surrounding property except when viewed from the adjacent Parking District. .15 Studios, radio and television. A facility which may include accommodations for filming/taping in front of live audiences.
.16 Back-of-House.
.0202 Hotel Accessory Support Uses.
.01 Administrative offices including temporary offices within existing hotel buildings during construction period only and subject to approval of the City Traffic and Transportation Manager for parking layout and vehicular access. .02 Alcoholic Beverage Sales, Off-Sale, accessory and incidental to and integrated within a hotel
.03 Alcoholic Beverages, On-Sale.
.04 Amusement devices and/or arcades within a hotel complex with no public access directly from the exterior of the building and subject to the provisions of Section 18.16.050 (Amusement Devices) of this Code.
.05 Banking facilities, including automated teller machines. .06 Barbershops.
.07 Beauty shops.
.08 Child day care services, within a hotel complex, intended for hotel and theme park employees and guests.
.09 Caretaker unit. A residential dwelling intended to be the primary or secondary living accommodations for the manager or caretaker of a hotel. For hotels containing less than three hundred (300) rooms, such unit shall be less than one thousand two hundred twenty-five (1,225) gross square feet in size and integrated within the hotel only. For hotels containing three hundred (300) rooms or more, such unit may not be more than three thousand (3,000) gross square feet.
.10 Health spas and physical fitness centers within hotel complex and limited strictly to the use of the guests and/or employees of such hotel complex.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-34
.11 Kitchens in a hotel complex or restaurant or kitchenettes in a hotel guest room or suite.
.12 Laundry and dry cleaning facilities as a part of a hotel facility. .13 Massage services as a part of a hotel complex in accordance with the requirements and permits set forth in Section 18.16.070 (Massage Establishments) and Chapter 18.54 (Sex Oriented Businesses) of this Code. .14 Meeting and convention facilities as a part of a hotel facility. .15 Outdoor stands and booths.
.16 Postal and copy services.
.17 Recreational facilities, when a part of a hotel. Recreational facilities include, but are not limited to, outdoor playground areas, tennis and racquetball courts, spas, and swimming pools, when integrated as part of a hotel only. .18 Rental agencies for automobiles (Automobile Rental Agency) provided the storage and/or display of rented vehicles is within a parking structure and vehicles are screened from view and are not located within required hotel complex parking spaces.
.19 Restaurants, indoor and outdoor.
.20 Retail uses, integrated into hotel.
.21 Signs within a feature landscape element with the following requirements:
(a) Shall be constructed in compliance with the Design Plan; (b) Shall replace monument signs permitted in subsection

18.114.130.060.0601 (Permitted Signs);
(c) Shall be setback a minimum of seven (7) feet from the ultimate public right-of-way;
(d) Shall not exceed a maximum of ten (10) feet in height; (e) Shall not have more than two sign faces per hotel entry drive; and (f) Shall not create a continuous wall along the public right-of-way. .22 Travel services.
.23 Former Hotel District - Hotel Accessory Support Uses:
(a) Automobile/vehicle parking lots or structures providing off-street parking spaces, as required by this code for uses permitted under this chapter.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-35
(b) Book stores, including newspaper and periodical sales. (c) Clothing stores.
(d) Confectionery shops, including candy stores, ice cream parlors, and establishments selling bakery goods and/or coffee.
(e) Custom print and art galleries.
(f) Dog and cat kennels, limited strictly to the pets of guests and patrons of such hotel or motel, provided such kennels shall not be located closer than forty (40) feet from hotel/motel guest rooms or residentially zoned property.
(g) Drugstores.
(h) Floral shops.
(i) Jewelry Stores.
(j) Luggage and accessory shops.
(k) Maintenance, and/or indoor storage facilities necessary to support the operation of a primary use.
(l) Miniature golf.
(m)Photo supply shops.
(n) Shoe repair shops.
(o) Souvenir, gift and/or novelty shops, including sales of sundry items. (p) Ticket agencies.
(q) Tobacco shops.
(r) Theaters, including dinner, legitimate or motion picture theaters, performance theaters or clubs and indoor amphitheaters. .0203 Gateway Facilities.
.01 Except as provided in subparagraph 18.114.060.020.0203.02, gateway facilities which provide access to the ticket booths/entry areas that serve theme parks, including but not limited to, directory and informational signs, flags, banners and changeable copy signs, provided the changeable copy signs shall have the following requirements:
(a) No more than one (1) changeable copy sign per street frontage; (b) Shall not be located within the required setback area along Katella Avenue; The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-36
(c) Maximum height of seventy (70) feet;
(d) Maximum sign copy area of thirteen hundred (1,300) square feet with a maximum of five hundred (500) square feet of changeable copy; and, (e) The changeable copy signs can be single or double-sided. .02 One gateway facility, which identifies the pedestrian entry to The Disneyland Resort Theme Park District, may encroach into the setback area adjacent to Katella Avenue provided that the gateway facility meets the following requirements:
(a) Maximum sign copy area for each side of the gateway facility shall not exceed two hundred and fifty (250) square feet;
(b) No changeable copy sign area shall be permitted;
(c) The design and location of the gateway facility shall be subject to the review and approval of the Planning Director as being compatible in scale with the pedestrian entryway, and compatible in design with the gateway facilities permitted in accordance with subparagraph

18.114.060.020.0203.01 above. (Ord. 5580 § 12; October 22, 1996: Ord. 5736 § 1; September 19, 2000.)
.0204 Murals, provided if visible from the public right-of-way, a minor conditional use permit is required.
.030 Structural Height Limitations.
.0301 Maximum Permitted Structural Height. Except as limited by the provisions of subsections .0302 and .0303, the maximum structural height shall be in accordance with Section 18.114.050.070 (Structural Height and Lot Width Requirements) and the following:
.01 Within Area A shown on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map: two hundred fifty (250) feet, except that two structural thematic elements may have a height of three hundred (300) feet. .02 Within Area B shown on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map: two hundred fifty (250) feet, except that two structural thematic elements may have a height of three hundred (300) feet. .03 (Repealed by ______, insert date)
.0302 Maximum Permitted Structural Height at Required Setback:
.01 Harbor Boulevard: Seventy-Five (75) feet.
.02 Katella Avenue: Seventy-Five (75) feet.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-37
.03 Disneyland Drive: Two-Hundred and Fifty (250) feet, except between Ball Road and approximately 700 feet south of Ball Road right-of-way, 85 feet. .04 Walnut Street: Fifty (50) feet.
.05 Ball Road: Eighty-Five (85) feet.
.06 Interstate 5: Eighty-Five (85) feet.
.07 Magic Way: Two-Hundred and Fifty (250) feet.
.0303 Sky Exposure Plane. The maximum height of structures adjacent to the following streets shall not exceed one (1) additional foot of height above the Maximum Permitted Height at the required setback for each two (2) additional feet of setback as described in Section 18.114.030 (Definitions) and in Section 3.0 (Land Use Plan) of the Specific Plan:
.01 Katella Avenue.
.02 Disneyland Drive from the southern Ball Road right-of-way to seven hundred (700) feet south of the Ball Road right-of-way, as shown on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map.

Beginning at the one-hundred and forty (140) feet height level, the maximum height of structures between the southern Ball Road right-of-way to seven hundred (700) feet south of the Ball Road right-of-way, shall not exceed one (1) additional foot of height above the Maximum Permitted Height at for each four (4) additional feet of setback.
.03 Harbor Boulevard. (Ord. 5613 §5; September 16, 1997.) .04 Ball Road.
.05 Interstate 5.
.06 Walnut Street, beginning at the one-hundred and forty (140) feet height level, the maximum height of structures shall not exceed one (1) additional foot of height above the Maximum Permitted Height at for each four (4) additional feet of setback.
.040 Interior Structural Setback and Yard Requirements. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District, except as provided elsewhere in this chapter. Such setbacks shall be measured from the interior property line.
.0401 From interior lots wholly within the same District: zero (0) feet minimum, provided the minimum distance between structures is consistent with applicable building and fire codes.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-38
.0402 From interior lots in an adjacent District, but wholly within the Specific Plan area:
zero (0) feet minimum, provided the minimum distance between structures is consistent with applicable building and fire codes.
.0403 From adjacent interior lots wholly outside the Specific Plan area: ten (10) feet minimum, except zero (0) feet minimum is permitted adjacent to, and concurrent with, development of the Anaheim Resort Specific Plan Theme Park West Overlay, provided the minimum distance between structures is consistent with applicable building and fire codes.
.0404 From adjacent interior lots developed under the provisions of Section 18.114.100 (C-R Overlay): ten (10) feet minimum.
.050 Setbacks-Lots Abutting Public Rights-of-Way. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District, except as provided elsewhere in this chapter. Such setbacks shall be measured from the ultimate planned public right-of-way as designated on the Circulation Element of the General Plan and as further described in Section 4.0 (Public Facilities Plan) and Section

5.0 (Design Plan) of the Specific Plan. All setbacks shall be fully landscaped, irrigated and maintained in a manner in compliance with the Design Plan. .0501 Ball Road.
.01 From Interstate 5 to a point five hundred (500) feet east of the centerline of Disneyland Drive: an average of thirty (30) feet with a minimum of zero (0) feet, provided (a) the length of the building with a zero (0) foot setback shall not exceed ten (10) feet, with landscaping consistent with Design Plan, and (b) provided an open decorative fence, such as wrought iron, may be located no closer than ten (10) feet from the ultimate public right-of-way. .02 From a point five hundred (500) feet east of the centerline of Disneyland Drive to the centerline of Walnut Street: twenty (20) feet minimum if the height of the structure is seventy-five feet or less or thirty (30) feet minimum if the height of the structure is greater than seventy-five (75) feet, provided existing structures may remain as shown on Exhibit 3.2.3a (Existing Structures Permitted to Remain) of the Specific Plan and that a minimum of ten (10) feet of landscaping shall be consistent with Design Plan.
.0502 Harbor Boulevard.
.01 Within the C-R Overlay: Twenty-six (26) feet minimum, with landscaping consistent with Design Plan and in accordance with Section 18.116.100 of The Anaheim Resort Specific Plan No. 92-2 (Central Core).
.02 Between the C-R Overlay and a point approximately two hundred and fifty (250) feet north of the centerline of Disney Way: Twenty-six (26) feet minimum, with landscaping consistent with Design Plan.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-39
.03 Between a point approximately two hundred and fifty (250) feet north of the centerline of Disney Way and a point approximately one thousand three hundred and forty (1,340) feet north of the centerline of Disney Way: thirtyeight (38) feet minimum, provided (a) existing structures may remain as shown on Exhibit 3.2.3a (Existing Structures Permitted to Remain) of the Specific Plan and (b) landscaping shall be consistent with Design Plan. .04 Between a point approximately one thousand three hundred and forty (1,340) feet north of the centerline of Disney Way to Interstate 5 (Santa Ana Freeway):
twelve (12) feet minimum, with landscaping consistent with Design Plan. .0503 Interstate 5 (Santa Ana Freeway). Ten (10) feet minimum provided that sculptural, architectural elements not attached to a building may have a zero (0) foot setback with landscaping consistent with Design Plan.
.0504 Katella Avenue.
.01 From eastern side of the ultimate right-of-way of Walnut Street to the centerline of Disneyland Drive: nineteen (19) feet minimum, with landscaping consistent with the Design Plan.
.02 From the centerline of Disneyland Drive to a point eleven hundred (1,100) feet east of said centerline: nineteen (19) feet minimum, with landscaping consistent with Design Plan.
.03 From a point eleven hundred (1,100) feet east of the centerline of Disneyland Drive to the western right-of-way of Harbor Boulevard: nineteen (19) feet minimum, with landscaping consistent with Design Plan.
.0505 Disneyland Drive.
.01 Between Katella Avenue and a point one hundred and twenty-five (125) feet north of the northern right-of-way of Katella Avenue: subject to Exhibit

5.4.1.4.3a (Disneyland Drive Pedestrian Arrival Gateway South Landscape Treatment) of the Specific Plan, which provides for a one hundred and twentyfive (125) foot by one hundred and twenty-five (125) foot landscape triangle. .02 Between a point one-hundred and twenty-five (125) feet north of the northern right-of-way of Katella Avenue and a point three thousand five hundred (3,500) feet north of the northern right-of-way of Katella Avenue: eleven (11) feet minimum, provided existing walls and buildings shown on Exhibit 3.2.3a of the Specific Plan document (Existing Structures Permitted to Remain) may remain, and that landscaping shall be consistent with Design Plan. .03 Between the centerline of Ball Road and a point three thousand five hundred (3,500) feet north of the northern right-of-way of Katella Avenue: twenty (20) feet minimum, provided (a) existing structures may remain as shown on Exhibit 3.2.2a (Existing Structures Permitted to Remain) of the Specific Plan and (b) landscaping shall be consistent with Design Plan.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-40
.0506 West Place. Ten (10) feet minimum, if the height of the structure is thirty-five (35) feet or less or twenty (20) feet minimum, if the height of the structure is greater than thirty-five (35) feet with landscaping consistent with the Design Plan. (Ord. 5580 § 13; October 22, 1996.)
.0507 Walnut Street. Fifty (50) feet minimum structural setback and thirty (30) feet minimum landscape setback, provided (a) existing structures may remain as shown on Exhibit 3.3.2a (Existing Structures Permitted to Remain) of the Specific Plan, (b) fencing and walls are permitted to encroach in the areas beyond the thirty (30) foot setback area, and (c) landscaping shall be consistent with Design Plan. .060 (Repealed by ______, insert date).
.070 Limitation on Access from Walnut Street. No vehicular access from Walnut Street is permitted except for the existing emergency and service vehicle access for the Disneyland Hotel complex of the Design Plan and emergency vehicle and pedestrian access to and from Magic Way as shown on Exhibit 5.8.3b (Theme Park District – B Concept Plan). .080 Minimum Landscape and Open Space for Hotel Uses. The minimum landscape and recreation area for Hotel Uses within the Theme Park District shall be fifteen percent (15%) of the total area of the parcel. Such minimum landscaped open space may include:
landscape areas with plantings of trees, shrubs and groundcover; water features including, but not limited to, swimming pools, spas, ponds, lakes, and fountains; pedestrian walkways and patios; landscaped areas within parking facilities; areas intended for emergency access, paved with turf block. Paved areas intended primarily for vehicular traffic including, but not limited to, temporary and/or permanent parking facilities; driveways, and portecocheres shall not be considered as landscaped open space for the purposes of this requirement.
.090 360-Degree Architectural Treatments. Prior to submittal of building plans to the Building Division, a sight-line study shall be prepared and submitted for review by the Planning Services Division to determine the extent of on-site building or structure visibility from the ultimate public right-of-way or adjacent residential properties. The sight-line study shall include a to-scale site plan with annotations, to-scale site sections and three-dimensional renderings of the proposed building or structure to determine if a proposed building or structure will be visible by a 6-foot person from the furthest point of the ultimate public right-of-way on the opposite side of the street, or from 400-feet on perpendicular streets, measured from the property line. The requirement for a sight line study may be waived by the Planning and Building Director if it is demonstrated that the building or structure is completely hidden from view of the public right-of-way or adjacent residential properties.

If it is determined through review of the sight-line study that the building or structure will be visible from the furthest point of the ultimate public right-of-way on the opposite side of the street or from 400-feet on perpendicular streets, measured from the property line, application of the design criteria for the highest height range for a proposed building or structure, in lieu of criteria for the lower height ranges, will be required all the way to grade unless the Planning and Building Director determines by review of the sight-line study that the fencing/walls and landscape buffers provided will adequately screen views of the The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-41
proposed building or structure in the lower height range(s) from the public right-of-way or adjacent residential properties. In instances where a building/structure insignificantly exceeds a 360-Degree Architectural Treatments design criteria level, the Planning and Building Director may waive the additional design criteria level requirement in favor of extending the lesser design criteria level. The 360-Degree Architectural Treatments, including the height range criteria, are described in the Design Plan.

18.114.070 (Repealed by ________, insert date)

18.114.080 LAND USE AND SITE DEVELOPMENT STANDARDS –
PARKING DISTRICT.

This District is intended to accommodate parking facilities and/or surface parking lots as identified on Exhibit 3.3a (The Disneyland Resort District/Overlay Summary Tabulation – Maximum Allowable Development) of the Specific Plan and as set forth herein. (Ord. 5580 § 16; October 22, 1996.)
.010 Permitted Primary Uses and Structures.
.0101 Parking Facilities.
.0102 Transportation Facilities.
.020 Permitted Accessory Uses and Structures. The following accessory uses may be conducted where clearly incidental to and integrated with a permitted primary use:
.0201 Animal storage facilities. An establishment in which six or more dogs or other domesticated animals are housed, groomed or temporarily boarded. Such facilities shall be limited strictly to the use by patrons of the parking facility and guests of hotels in The Anaheim Resort and must be located a minimum of one hundred (100) feet from any property line, except when located adjacent to the Parking District or uses developed in the adjacent Anaheim Resort Specific Plan Parking Overlays.

Such facility shall be enclosed in an air-conditioned structure with the exception of an outdoor exercise area. Utilization of said outdoor exercise area shall be limited to one animal at a time. Said facility shall support and be consistent with the intent of the operation of the parking facility. Said facility shall also be designed so that noise associated with the operation of the animal storage facility shall not exceed 60dBA at any exterior Specific Plan property line, as demonstrated by an acoustical analysis submitted prior to the issuance of a building permit for the animal storage facility. (Ord. 5736 § 2; September 19, 2000.)
.0202 Murals, provided that if visible from the public right-of-way, a minor conditional use permit is required.
.0203 Kiosks.
.0204 Gateway Facilities.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-42
.01 Clementine Street and Disney Way. One gateway facility, which identifies the vehicular arrival to the Parking District, may encroach into the setback area adjacent to Clementine Street provided that the gateway facility meets the following requirements:
(a) Maximum sign copy area for each side of the gateway facility shall not exceed two hundred and fifty (250) square feet;
(b) No changeable copy sign area shall be permitted;
(c) Maximum height of seventy (70) feet;
(d) The design and location of the gateway facility shall be subject to the review and approval of the Planning Director as being compatible in scale with the vehicular entry, and compatible in design with the gateway facilities permitted in accordance with subparagraph

18.114.060.020.0203.01.
.030 Structural Height and Area Limitations.
.0301 Maximum Permitted Structural Height. The maximum height of a parking facility in this District is limited to sixty-five (65) feet with a maximum of six levels in the West Parking Area and seventy-five (75) feet with a maximum of seven levels in the East Parking Area, except that appurtenances to a structure may exceed these maximums, providing they do not exceed by more than twenty (20) feet the maximum heights provided herein or the provisions of subsection

18.114.050.070.0701 (Maximum Permitted Structural Height). .0302 Maximum Permitted Structural Height at Required Setback:
.01 Walnut Street: Forty (40) feet.
.02 Magic Way: Sixty-five (65) feet; upon road right-of-way abandonment Maximum Permitted Structural Height at setback shall be as shown on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map.
.03 Katella Avenue: Forty-five (45) feet for a Parking Facility only. .04 Clementine Street/Manchester Avenue: Seventy-five (75) feet for a Parking Facility only.
.05 Disney Way: Seventy-five (75) feet for a Parking Facility only. .0303 Sky Exposure Plane. The maximum height of structures adjacent to the following streets shall not exceed one (1) additional foot of height above the Maximum Permitted Height at the required setback for each two (2) additional feet of setback as described in Section 18.114.030 (Definitions) and in Section 3.0 (Land Use Plan) of the Specific Plan:

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-43
.01 Katella Avenue.
.02 Walnut Street. (Ord. 5613 § 7; September 16, 1997.) .040 Structural Setback and Yard Requirements. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District except as provided elsewhere in the chapter. Such setbacks shall be measured from the interior property line.
.0401 From interior lots wholly within the same District: zero (0) feet minimum, provided the minimum distance between structures is consistent with applicable building and fire codes.
.0402 From interior lots in an adjacent District, but wholly within the Specific Plan area (excluding District A): zero (0) feet minimum, provided the minimum distance between structures is consistent with applicable building and fire codes, except:
.01 District A and East Parking Area Adjacent to District A. Where two adjacent properties are located in District A and the East Parking Area adjacent to District A, the interior setback shall be a minimum of 10 feet from the property line.
.0403 From adjacent interior lots wholly outside the Specific Plan area: ten (10) feet minimum, except zero (0) feet minimum is permitted adjacent to, and concurrent with, development of the Anaheim Resort Specific Plan Parking Overlay, provided the minimum distance between structures is consistent with applicable building and fire codes.
.0404 From adjacent lots developed under the provisions of Section 18.114.100 (C-R Overlay) and Section 18.114.095 (Land Use and Site Development Standards – District A): ten (10) feet minimum. (Ord. 5580 § 18 (part); October 22, 1996.) .050 Setbacks-From Abutting Public Rights-of-Way. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District, except as provided elsewhere in this chapter. Such setbacks shall be measured from the ultimate planned public right-of-way as designated on the Circulation Element of the General Plan and as further described in Section 4.0 (Public Facilities Plan) and Section

5.0 (Design Plan) of the Specific Plan. All setbacks shall be fully landscaped, irrigated and maintained in a manner in compliance with the Design Plan. .0501 Magic Way. Twenty (20) feet with landscaping consistent with the Design Plan; upon road right-of-way abandonment: none required.
.0502 Clementine Street/Manchester Avenue. Fourteen (14) feet minimum, with landscaping consistent with the Design Plan.
.0503 Disney Way.
.01 North side of the street:

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-44
(a) From the centerline of Harbor Boulevard to a point six hundred (600) feet east: Twenty (20) feet minimum, with landscaping consistent with the Design Plan.
(b) From Clementine Street to a point seven hundred (700) feet west of the centerline of Clementine Street: Twenty (20) feet minimum, with landscaping consistent with the Design Plan.
(c) Provided that vehicular ramps, pedestrian bridges, or moving sidewalks may have a zero (0) foot setback;
.02 South side of street: Twenty (20) feet minimum, with landscaping consistent with the Design Plan.
.0503 Katella Avenue. Eleven (11) feet minimum, with landscaping consistent with the Design Plan.
.0504 Walnut Street. Thirty (30) feet minimum, with landscaping consistent with the Design Plan. (Ord. 5580 § 18 (part); October 22, 1996.) .060 Limitations of Access from Public Rights-of-Way. No vehicular access from Walnut Street is permitted, except for existing emergency vehicle access located north of Mickey and Friends Parking Structure and emergency vehicle access at Magic Way. .070 Parking District Requirements. Parking spaces provided within this District shall be used to fulfill the parking requirements of theme park square footage in the Theme Park and Southeast Districts and in the Anaheim Resort Specific Plan Theme Park Overlays. .0701 Use of Parking Spaces. Parking spaces within this District may be used by theme park guests and employees and the general public during days and hours not less than the hours of operation of theme parks in the Theme Park and Southeast Districts and in the Anaheim Resort Specific Plan Theme Park Overlays, provided that shuttle services shall be provided from the East Parking Area of the Parking District to the Southeast District ongoing during operation of theme park uses in the Southeast District.
.0702 Total Number of Spaces. The total number of vehicle parking spaces provided within the District shall not exceed thirty-four thousand three hundred (34,300) spaces.
.0703 Type of Parking Facilities Provided. Parking spaces may be provided within parking facilities or on surface parking lots. Such surface parking lots may be permanent and are subject to the review and approval of the City Traffic and Transportation Manager.
.0704 Landscaping of Surface Parking Lots. Surface parking lots used for Speed Parking, as defined in Section 18.114.030 (Definitions), within this District or intended to serve theme park employees shall be exempt from the surface parking lot landscape requirements described herein, except that any such lot shall be surrounded at the The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-45
perimeter by a continuous, evergreen landscape screen consisting of shrubs, trees and ground cover which can achieve a height of forty-two (42) inches in five (5) years, and is intended to prevent views into the surface parking lots from surrounding adjacent public rights-of-way. (Ord. 5580 § 18A; October 22, 1996.) (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5420 §§ 6-9; April 12, 1994; Ord. 5920 § 1 (part); June 8, 2004: Ord. 6382 § 33; October 18, 2016.) The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-46

18.114.090 LAND USE AND SITE DEVELOPMENT STANDARDS -
SOUTHEAST DISTRICT.

This District is intended to accommodate expansion of The Disneyland Resort with additional theme park, hotel, retail, dining and entertainment, and support uses as identified on Exhibit 3.3a (The Disneyland Resort District/Overlay Summary Tabulation – Maximum Allowable Development) of the Specific Plan or as set forth herein. (Ord. 5580 § 19; October 22, 1996.) .010 Permitted Primary Uses and Structures.
.0101 Parking Facilities.
.0102 Theme parks as described in subsection 18.114.060.010 (Theme Park - Permitted Primary Uses and Structures), except for the limitations provided herein. .0103 Retail Entertainment Centers, with the amount of restaurant limited to twenty percent (20%) of the allotted theme park square footage in the District and Anaheim Resort Specific Plan Theme Park East Overlay.
.0104 Hotels as described in subsection 18.114.060.010 (Theme Park - Permitted Primary Uses and Structures).
.020 Permitted Accessory Uses and Structures.
.0201 Theme Park Accessory Support Facilities as described in subsection

18.114.060.020.0201 (Theme Park Accessory Support Facilities). .0202 Hotel/Motel Accessory Support Uses. Accessory uses as described in subsection

18.114.060.020.0202 (Hotel Accessory Support Uses).
.0203 Gateway Facilities.
.01 Katella Avenue. Gateway facilities as described in paragraph .01 of subsection

18.114.060.020.0203 (Gateway Facilities).
.02 Haster Street. One gateway facility, which identifies the vehicular arrival to the Southeast District, may encroach into the setback area adjacent to Haster Street provided that the gateway facility meets the following requirements:
(a) Maximum sign copy area for each side of the gateway facility shall not exceed one hundred and twenty-five (125) square feet;
(b) No changeable copy sign area shall be permitted;
(c) Maximum height of thirty-five (35) feet;
(d) The location of the gateway facility shall be within the middle third of the setback area frontage. The design and location of the gateway facility shall be subject to the review and approval of the Planning Director as being compatible in scale with the vehicular entry, and compatible in design with The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-47
the gateway facilities permitted in accordance with subparagraph

18.114.060.020.0203.01.
.030 (Repealed by ________, insert date).
.035 Density of Hotel Units. The Southeast District shall be permitted to have up to 1,852 hotel/motel rooms per Section 18.114.050.020 (Limitation on Total Number of Hotel Guest Rooms or Suites).
.040 Structural Height and Area Limitations.
.0401 Maximum Permitted Structural Height. Except as limited by the provisions of subsections .0402,.0403, and .0404, the maximum structural height shall be in accordance with Section 18.114.050.070 (Structural Height and Lot Width Requirements) and the following:
.01 Within Area C shown on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map: one hundred and seventy (170) feet.
.0402 Maximum Permitted Structural Height at Required Setback:
.01 Katella Avenue: Seventy-Five (75) feet.
.02 Haster Street: Seventy-Five (75) feet.
.03 Adjacent to a Residential Zone: Seventy-Five (75) feet. .04 Adjacent to Non-Residential Zone: One-Hundred Forty (140) feet. .0403 Sky Exposure Plane Adjacent to Public Rights-of-Way. The maximum height of structures adjacent to the following streets shall not exceed one (1) additional foot of height above the maximum permitted height at the required setback for each two (2) additional feet of setback as described in Section 18.114.030 (Definitions) and in Section 3.0 (Land Use Plan) of the Specific Plan:
.01 Katella Avenue.
.02 Haster Street.
.0404 Sky Exposure Plane Adjacent to Residential Zone. The maximum height of structures at the required setback adjacent to a residential zone shall not exceed one (1) foot of height for each two (2) feet of setback from the adjacent residential zone up to the maximum height permitted in the District. (Ord. 5613 § 8; September 16, 1997.)
.050 Structural Setback and Yard Requirements. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District except as provided elsewhere in the chapter. Such setbacks shall be measured from the interior property line.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-48
.0501 From interior lots wholly within the same District: zero (0) feet minimum, provided the minimum distance between structures is consistent with applicable building and fire code requirements.
.0502 From adjacent commercial interior lots wholly outside the Specific Plan area: ten (10) feet minimum, except zero (0) feet minimum is permitted adjacent to, and concurrent with, development of the Anaheim Resort Specific Plan Theme Park Overlay, provided the minimum distance between the structures is consistent with applicable building and fire codes.
.0503 From adjacent multiple-family residential zone: minimum fifty (50) foot wide structural setback, with not less than twenty (20) feet of landscaping adjacent to the property line, consistent with Design Plan Exhibit 5.3.4a (Tree Density Plan) and Exhibit 5.8.2b (Interior Property Adjacent to Residential Uses). .0504 From adjacent lots developed under the provisions of Section 18.114.100 (C-R Overlay): ten (10) feet minimum.
.060 Setbacks - Lots Abutting Ultimate Public Rights-of-Way. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District, except as provided elsewhere in this chapter. Such setbacks shall be measured from the ultimate planned public right-of-way as designated on the Circulation Element of the General Plan and as further described in Section 4.0 (Public Facilities Plan) and Section

5.0 (Design Plan) of the Specific Plan. All setbacks shall be fully landscaped, irrigated and maintained in a manner in compliance with the Design Plan. .0601 Haster Street. Thirty (30) feet minimum with landscaping consistent with the Design Plan.
.0602 Katella Avenue. Eleven (11) feet minimum with landscaping consistent with the Design Plan. (Ord. 5580 § 21; October 22, 1996.)
.070 360-Degree Architectural Treatments. The 360-Degree Architectural Treatments, including the height range criteria, are described in the Design Plan. .0701 Prior to submittal of building plans to the Building Division, a sight-line study shall be prepared and submitted for review by the Planning Services Division to determine the extent of on-site building or structure visibility from the ultimate public right-of-way. The sight-line study shall include a to-scale site plan with annotations, to-scale site sections and three-dimensional renderings of the proposed building or structure to determine if a proposed building or structure will be visible by a 6-foot person from the furthest point of the ultimate public right-of-way on the opposite side of the street, or from 400-feet on perpendicular streets, measured from the property line. The requirement for a sight line study may be waived by the Planning and Building Director if it is demonstrated that the building or structure is completely hidden from view of the public right-of-way. If it is determined through review of the sight-line study that the building or structure will be visible from the furthest point of the ultimate public right-of-way on the opposite side of The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-49
the street or from 400-feet on perpendicular streets, measured from the property line, application of the design criteria for the highest height range for a proposed building or structure, in lieu of criteria for the lower height ranges, will be required all the way to grade unless the Planning and Building Director determines by review of the sight-line study that the fencing/walls and landscape buffers provided will adequately screen views of the proposed building or structure in the lower height range(s) from the public right-of-way or adjacent residential properties. In instances where a building/structure insignificantly exceeds a 360-Degree Architectural Treatments design criteria level, the Planning and Building Director may waive the additional design criteria level requirement in favor of extending the lesser design criteria level.
.0702 For buildings or structures adjacent to the abutting residentially-zoning properties, application of the Greater then 30-Foot up to 50-Foot Height Level design criteria will be required for surfaces above 20 feet.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-50

18.114.095 LAND USE AND SITE DEVELOPMENT STANDARDS – DISTRICT A. .010 Purpose. This District has been established to permit the uses set forth in Chapter 18.116 (Anaheim Resort Specific Plan No. 92-2 Zone). (Ord. 5580 § 22 (part); October 22, 1996.) .020 Permitted Primary Uses and Structures. All primary uses and structures permitted in subsection 18.116.070.020 (Permitted Primary Uses and Structures), subject to the limitations prescribed in Section 18.114.050 (Land Uses and Site Development Standards - General) subsection 18.114.095.060 (District A Density), subsection 18.116.070.010 (Permitted Uses and Structures General) and subsection 18.116.070.070 (Interpreting Classes of Uses). (Ord. 5580 § 22 (part); October 22, 1996.) .030 Permitted Accessory Uses and Structures. All accessory uses and structures permitted in subsection 18.116.070.050 (Accessory Uses). (Ord. 5580 § 22 (part); October 22, 1996.) .040 Permitted Temporary Uses and Structures. All temporary uses and structures permitted in the subsection 18.116.070.060 (Temporary Uses and Structures). (Ord. 5580 § 22 (part); October 22, 1996.)
.050 Conditional Uses. All conditional uses and structures listed in subsection 18.116.070.030 (Conditionally Permitted Uses) and subsection 18.116.070.070 (Interpreting Classes of Uses). (Ord. 5580 § 22 (part); October 22, 1996.)
.060 District A Density. The District A density is based upon hotel/motel development and allows up to twenty percent (20%) of each hotel/motel project's gross square footage, excluding parking facilities, to be developed with integrated (i.e., included within the main hotel/motel complex) accessory uses. These accessory uses will reduce the otherwise maximum permitted hotel/motel density at the rate of one (1) hotel/motel room per six hundred (600) gross square feet of accessory use area. For properties proposed to be developed with permitted or conditionally permitted uses other than hotels/motels with accessory uses, the traffic generation characteristics of said uses shall not exceed those associated with the otherwise permitted hotel/motel density (including accessory uses) as determined by the City's Traffic and Transportation Manager prior to Final Site Plan review and approval.
.0601 The maximum number of hotel/motels permitted within District A, as designated on Exhibit 3.3c (Development Plan) of the Specific Plan, shall be Medium Density with up to seventy-five (75) hotel/motel rooms per gross acre or seventy-five (75) hotel/motel rooms per parcel existing on the date of adoption of the Disneyland Resort Specific Plan (June 29, 1993), whichever results in a greater number. .0602 Densities of contiguous parcels/lots may be combined for the purpose of developing a master plan project without processing a subdivision map to combine the parcels/lots subject to the following:
.01 That the density on one or more parcels/lots may exceed the maximum density allowed for said parcel/lot provided that: the maximum overall density permitted for the combined parcels/lots is not exceeded, the proposed project The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-51
does not exceed traffic impacts associated with the otherwise permitted hotel/motel density as determined by the City's Traffic and Transportation Manager and the environmental effects associated with the proposed project are consistent with those cleared by the Environmental Impact Report for The Disneyland Resort Specific Plan (EIR No. 311) or other final environmental documentation.
.02 That the proposed density for each parcel/lot is shown on the Final Site Plan processed in accordance with paragraph 18.114.040.020.0201 (Process for Approval).
.03 That an unsubordinated covenant shall be recorded on each of the affected parcels limiting the density on each parcel to that shown on the approved Final Site Plan and that said covenant be recorded prior to the issuance of the first building permit for the master plan project. The covenant shall be prepared in a form satisfactory to the City Attorney and shall be recorded with the Office of the Orange County Recorder. A copy of the recorded covenant shall then be submitted to the Planning Department.
.070 Maximum Permitted Heights.
.0701 Maximum Permitted Structural Height. The maximum permitted height of structures shall be as indicated on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map in accordance with Section 18.40.080 (Structural Height Limitations – Anaheim Commercial Recreation Area). .0702 Repealed by Ord. 5613, 9/16/97
.0703 Repealed by Ord. 5613, 9/16/97 (Ord. 5613 § 9; September 16, 1997.) .080 Interior Structural Setback and Yard Requirements from Adjacent Interior Lots. The minimum structural setback from adjacent interior lots shall be ten (10) feet minimum .090 Setbacks from Abutting Public Rights-of-Way. The following minimum setback requirements shall apply to permanent buildings and structures constructed within this District. Such setbacks shall be measured from the ultimate planned public right-of-way as designated on the Circulation Element of the General Plan and as further described in Sections 4.0 (Public Facilities Plan)," and 5.0 (Design Plan) of the Specific Plan. All setbacks shall be fully landscaped, irrigated and maintained in a manner in compliance with the Design Plan and in accordance with Section 18.116.130 (Central Core). .0901 Harbor Boulevard. Twenty-six (26) feet minimum, with landscaping consistent with the Design Plan.
.0902 Disney Way (formerly Freedman Way). Twenty (20) feet minimum, with landscaping consistent with the Design Plan. (Ord. 5420 § 10; April 12, 1994; Ord. 5580 § 23; October 22, 1996; Ord. 5920 § 1 (part); June 8, 2004; Ord. 6022 § 10; May 25, 2006.)
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-52

18.114.100 C-R OVERLAY.
.010 Purpose. The C-R Overlay has been established to permit the uses set forth in Chapter 18.116 (Anaheim Resort Specific Plan No. 92-2 Zone) if the properties are not developed as part of The Disneyland Resort Specific Plan. (Ord. 5580 § 24 (part); October 22, 1996.) .020 Permitted Primary Uses and Structures. All primary uses and structures permitted in subsection 18.116.070.020 (Permitted Primary Uses and Structures) but subject to the limitations prescribed in Section 18.114.050 (Land Use and Site Development Standards - General), subsection 18.114.100.060 (C-R Overlay Density), subsection 18.116.070.010 (Permitted Uses and Structures - General) and subsection 18.116.070.070 (Interpreting Classes of Uses). (Ord. 5580 § 24 (part); October 22, 1996.) .030 Permitted Accessory Uses and Structures. All accessory uses and structures permitted in subsection 18.116.070.050 (Accessory Uses). (Ord. 5580 § 24 (part); October 22, 1996.) .040 Permitted Temporary Uses and Structures. All temporary uses and structures permitted in the subsection 18.116.070.060 (Temporary Uses and Structures). (Ord. 5580 § 24 (part); October 22, 1996.)
.050 Conditional Uses. All conditional uses and structures listed in subsection 18.116.070.030 (Conditionally Permitted Uses) and subsection 18.116.070.070 (Interpreting Classes of Uses). (Ord. 5580 § 24 (part); October 22, 1996.)
.060 C-R Overlay Density. The C-R Overlay Density designations are based upon hotel/motel development and allow up to twenty percent (20%) of each hotel/motel project's gross square footage, excluding parking facilities, to be developed with integrated (i.e., included within the main hotel/motel complex) accessory uses. These accessory uses will reduce the otherwise maximum permitted hotel/motel density at the rate of one hotel/motel room per six hundred (600) gross square feet of accessory use area. For properties proposed to be developed with permitted or conditionally permitted uses other than hotels/motels with accessory uses, the traffic generation characteristics of said uses shall not exceed those associated with the otherwise permitted hotel/motel density (including accessory uses) as determined by the City's Traffic and Transportation Manager prior to Final Site Plan review and approval. The maximum number of hotels/motels permitted within the C-R Overlay shall be:
.0601 For parcels designated Low Density on Exhibit 3.3.5a (C-R Overlay) of the Specific Plan, up to fifty (50) hotel/motel rooms per gross acre or seventy-five (75) hotel/motel rooms per lot or parcel existing on the date of adoption of The Disneyland Resort Specific Plan (June 29, 1993), whichever is greater.
.0602 For parcels designated Medium Density on Exhibit 3.3.5a (C-R Overlay) of the Specific Plan, up to seventy-five (75) hotel/motel rooms per gross acre or seventyfive (75) rooms per lot or parcel existing on the date of adoption of The Disneyland Resort Specific Plan (June 29, 1993), whichever is greater.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-53
.0603 For parcels that are developed with hotel/motel rooms which exceed the maximum density designation, the number of rooms existing on the date of adoption of The Disneyland Resort Specific Plan (June 29, 1993) may be rebuilt or modified at their existing density. (Ord. 5580 § 24 (part); October 22, 1996.) .0604 Densities of contiguous parcels/lots may be combined for the purpose of developing a master plan project without processing a subdivision map to combine the parcels/lots subject to the following:
.01 That the density on one or more parcels/lots may exceed the maximum density allowed for said parcel/lot provided that: the maximum overall density permitted for the combined parcels/lots is not exceeded, the proposed project does not exceed traffic impacts associated with the otherwise permitted hotel/motel density as determined by the City's Traffic and Transportation Manager and the environmental effects associated with the proposed project are consistent with those cleared by the Environmental Impact Report for The Disneyland Resort Specific Plan (EIR No. 311) or other final environmental documentation.
.02 That the proposed density for each parcel/lot is shown on the Final Site Plan processed in accordance with paragraph 18.114.040.020.0201 (Process for Approval).
.03 That an unsubordinated covenant be recorded on each of the affected parcels limiting the density on each parcel to that shown on the approved Final Site Plan and that said covenant be recorded prior to the issuance of the first building permit for the master plan development. The covenant shall be prepared in a form satisfactory to the City Attorney and shall be recorded with the Office of the Orange County Recorder. A copy of the recorded covenant shall then be submitted to the Planning Division of the Planning Department. .070 Maximum Permitted Heights. The maximum permitted height of structures shall be as indicated on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map in accordance with Section 18.40.080 (Structural Height Limitations – Anaheim Commercial Recreation Area). (Ord. 5613 § 10; September 16, 1997.) .080 Interior Structural Setback and Yard Requirements from Adjacent Interior Lots. The following minimum setback requirements apply to structures developed under the provisions of Section 18.114.100 (C-R Overlay), except as provided elsewhere in this chapter: ten (10) feet minimum.
.090 Setbacks from Abutting Public Rights-of-Way. The minimum setback requirements for structures developed under the provisions of this section shall be as described for the base District the structure is located in and in accordance with Section 18.116.130 (Central Core) with the following exceptions:

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-54
.0901 Clementine Street. Twenty (20) feet minimum, if the height of the structure is seventy-five feet or less in height or thirty (30) feet minimum, if the height of the structure is greater than seventy-five (75) feet.
.0902 Disney Way. Twenty (20) feet minimum, if the height of the structure is seventyfive feet or less in height or thirty (30) feet minimum, if the height of the structure is greater than seventy-five (75) feet.
.0903 Katella Avenue. Eleven (11) feet minimum, with landscaping consistent with the Design Plan.
.100 Permitted Encroachments into Required Yard and Setback Areas. Allowable encroachments into required setback areas shall comply with the provisions provided in Table 116-H (Permitted Encroachments: C-R District) of Section 18.116.090.040 (Permitted Encroachments into Required Yard and Setback Areas. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5920 1 (part); June 8, 2004: Ord. 6425 § 30; December 19, 2017.) The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-55

18.114.105 ANAHEIM GARDENWALK OVERLAY.
.010 Purpose. The Anaheim GardenWalk Overlay has been established to provide for the development of the Anaheim GardenWalk pursuant to the uses set forth in subsection

18.114.105.020 (Conditional Uses) and subject to the density limitations set forth in subsection 18.114.105.030 (Anaheim GardenWalk Density), if the properties are not developed in accordance with The Disneyland Resort Specific Plan Parking District (East Parking Area) requirements or the District A or C-R Overlay requirements. (Ord. 6022 §§ 11, 12; May 25, 2006.)
.020 Conditional Use and Structures.
.0201 The following buildings, structures and uses set forth in paragraphs .0202 and .0203 shall be permitted as part of the Anaheim GardenWalk project provided that:
.01 Conditional Use Permit No. 4078, as amended, is approved pursuant to, and subject to, the conditions and required showings of Chapter 18.66 (Conditional Use Permits);
.02 All uses and structures set forth in subsection 18.116.070.050 (Accessory Uses and Structures) and in subsection 18.116.070.060 (Temporary Uses and Structures) shall be permitted in the Anaheim GardenWalk Overlay; .03 All uses set forth in Section 18.116.070 (Uses - Commercial Recreation (C-R) District (Development Area 1)) that are designated as “prohibited uses,” shall be prohibited in the Anaheim GardenWalk Overlay;
.04 All development is subject to the limitations described in Section 18.114.050 (Land Use and Site Development Standards - General); and, .05 The Anaheim GardenWalk project shall be designed in accordance with the Conceptual Site Plans and Sign Plans shown in Conditional Use Permit No. 4078, as amended. (Ord. 6221 § 5; August 23, 2011.)
.0202 Hotels, including suite-type hotels, and vacation ownership resort units, as described in subsection 18.114.105.030 (Anaheim GardenWalk Density). For the purpose of the Anaheim GardenWalk Overlay, condominium hotels are hotels which are facilities meeting the definition of a hotel with ownership structured as a condominium (non-residential), cooperative or other ownership/financing arrangement found by the Planning Director to be similar in function and/or operation, but shall not include timeshares in or interval fractional ownership of a hotel; and, shall be deed restricted to limit owner occupancy to a maximum of two (2) weeks per year.
.0203 All conditional uses and structures listed in subsection 18.116.070.030 (Conditionally Permitted Uses) which implements the list of uses described in subsection 18.114.105.030 (Anaheim GardenWalk Density) as further described below:

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-56
.01 Specialty Retail/Entertainment Center with integrated management and a festive theme orientation and plaza/pedestrian-oriented amenities with the following types of uses:
(a) Banking facilities.
(b) Children's, men's, and women's apparel, shoes, jewelry and accessories. (c) Entertainment facilities (amusement arcades, skating rinks, outdoor recreational playground areas).
(d) Shopping services.
(e) Specialty merchandise, gifts and toys.
(f) Transportation/travel services including an automobile rental agency office (with no on-site vehicular storage).
(g) Radio and television studio to enable live and/or taped broadcast facilities at the site.
(h) Baby-sitting services.
(i) Fast-food/food court-type and walkup/ specialty restaurants. (j) Enclosed and semi-enclosed full-service and theme-type restaurants/nightclubs with or without on-site sale and consumption of beer, wine, and alcoholic beverages and associated entertainment uses (billiards, dancing, live and recorded performances).
(k) Art galleries/museums.
.02 Outdoor events/uses held within the confines of Anaheim GardenWalk, out of view of the public right-of-way and not directed towards the public right-ofway including open-air festival events oriented towards tourists and guests for public gatherings, speeches, concerts, presentations, or shows; outdoor booths, kiosks and stands; and, outdoor special lighting effects. .03 Theaters, including dinner, legitimate or motion picture theaters, performance theaters or night clubs, and indoor amphitheaters.
.04 Parking/transportation facilities for automobiles, buses, shuttles, and taxis. .05 Murals.
.06 Onsite directional signs.
.07 Icon/themed signage elements set forth in subparagraph

18.114.130.060.0602.05. (Ord. 6022 § 13; May 25, 2006.) The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-57
.030 Anaheim GardenWalk Density. The Anaheim GardenWalk Overlay encompasses two areas (Areas A and B) as identified on Exhibit No. 3.3.6a (Anaheim GardenWalk Overlay). The maximum density for the Anaheim GardenWalk Overlay shall be as follows: 590,265 square feet of specialty retail, restaurants, and entertainment uses, including movie theaters; 1,628 hotel rooms (including up to 500 vacation ownership units) and 278,817 square feet of hotel accessory uses; a transportation center, and 4,800 parking spaces. The Anaheim GardenWalk Overlay density is set forth in more detail in Exhibit 3.3.6b (Anaheim GardenWalk Overlay Development Program) of the Specific Plan . (Ord. 6022 § 14; May 25, 2006; Ord. 6221 § 6; August 23, 2011.)
.040 Maximum Permitted Heights. The maximum permitted height of structures shall be as indicated on the Anaheim Commercial Recreation Area Maximum Permitted Structural Height Map in accordance with Section 18.40.080 (Structural Height Limitations – Anaheim Commercial Recreation Area).
.050 Interior Structural Setback and Yard Requirements from Adjacent Interior Lots. A ten-foot minimum setback adjacent to interior lot lines abutting the Anaheim Resort Specific Plan No. 92-1 Zone boundary and adjacent to Anaheim GardenWalk Overlay, Area B is required for structures developed under the provisions of Section 18.114.105 (Anaheim GardenWalk Overlay).
.060 Setbacks from Abutting Public Rights-of-Way. The minimum setback requirements for structures developed under the provisions of this Section shall be as described for the base District the structure is located in with the following exceptions:
.0601 Clementine Street. Twenty (20) feet minimum, if the structure is seventy-five (75) feet or less in height or thirty (30) feet minimum, if the structure is greater than seventy-five (75) feet in height with landscaping consistent with the Design Plan. .0602 Disney Way (formerly Freedman Way). Twenty (20) feet minimum, if the structure is seventy-five (75) feet or less in height or thirty (30) feet minimum, if the structure is greater than seventy-five (75) feet in height with landscaping consistent with the Design Plan.
.0603 Katella Avenue. Eleven (11) feet minimum, with landscaping consistent with the Design Plan.
.0604 Harbor Boulevard. Twenty-six (26) feet, minimum, with landscaping consistent with the Design Plan. (Ord. 5689 § 4; July 13, 1999; Ord. 5807 § 3; March 19, 2002.) .070 Minimum Lot Width. Lots shall comply with the minimum lot width provisions of paragraph .0704 of subsection .070 (Structural Height and Lot Width Requirements) of Section

18.114.050 (Land Use and Site Development Standards - General). Notwithstanding the foregoing, lots in the Anaheim GardenWalk Overlay shall have a minimum cumulative frontage of one hundred seventy-five (175) linear feet, provided that an unsubordinated covenant satisfactory to the Planning Department and the City Attorney's Office is recorded with the Orange County Recorder requiring development of the lots in compliance with The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-58
Conditional Use Permit No. 4078, as amended, as part of the Lifestyle Retail and Entertainment Complex approved therein. (Ord. 6022 § 16; May 25, 2006.) .080 Balconies and Architectural Projections Permitted. .0801 Balconies and architectural projections may encroach a maximum of three (3) feet into the minimum required building setback adjacent to any ultimate public rightof-way. .0802 Architectural projections for the parapet caps on the roof line of a signature restaurant building at the northwest corner of Katella Avenue and Clementine Street may encroach a maximum of six (6) feet, six (6) inches into the minimum required building setback adjacent to the public right-of-way to provide architectural interest and variety. (Ord. 6056 § 1; April 24, 2007)
.090 Driveway Spacing. All driveway spacing shall comply with paragraph .1202 of subsection .120 (Parking Space and Access Design) of Section 18.114.110 (Off-Street Parking and Loading Requirements), provided that a minimum distance between driveways of twenty five (25) feet may be permitted on Disney Way if one of the driveways is limited to emergency access only, subject to the approval of the City Traffic and Transportation Manager. (Ord. 5920 § 1 (part); June 8, 2004: Ord. 6022 § 17; May 25, 2006.). .100 Permitted Encroachments into Required Yard and Setback Areas. The required landscape setback area adjacent to the Disney Way and Clementine Street ultimate public right-of-ways may be paved provided:
.1001 The paved area will serve pedestrian-related activities (restaurant outdoor dining, and limited pedestrian walkways from the public right-of-way to the Anaheim GardenWalk complex as approved by the Planning Director and the City Engineer). .1002 Clementine Street. A minimum seven (7) foot wide area of the required setback area between any restaurant outdoor dining area and the public right-of-way shall contain live landscape material.
.1003 Disney Way. A minimum five (5) foot wide area of the required setback area between any restaurant outdoor dining area and the public right-of-way shall contain live landscape materials. Further, that any outdoor dining areas located within the setback area may be a maximum of three (3) foot above or below grade of the adjacent public right-of-way and that no retaining walls or other structures located in the setback area shall exceed three feet in height unless otherwise required by the Anaheim Building Code. (Ord. 6022 § 18; May 25, 2006.)

18.114.106 CENTRAL CORE PROVISIONS FOR THE ANAHEIM GARDENWALK OVERLAY.
.010 Purpose. The purpose of the Central Core is to create a consistent, high quality pedestrian environment that reinforces the character established by the landscape and other streetscape elements identified in the Anaheim Resort Identity Program. The Central Core boundaries encompass lots or parcels with frontage on Harbor Boulevard and Katella Avenue.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-59
Subsections .020 and .040 below apply to the minimum required setback areas adjacent to the ultimate public right-of-way. Subsection .030 below applies to the area between the ultimate public right-of-way and the actual (constructed) building setback. .020 Setbacks Adjacent to Harbor Boulevard and Katella Avenue. The required landscape setback area adjacent to the Harbor Boulevard and Katella Avenue ultimate public rights-of-way may be paved provided:
.0201 The paved area will serve pedestrian-related activities (restaurant outdoor dining, and limited pedestrian walkways from the public right-of-way to the Anaheim GardenWalk complex as approved by the Planning Director and the City Engineer); .0202 Landscape shall be designed and installed in conformance with the tree density requirements identified in the Design Plan and depicted in Exhibit 5.3.4a (Tree Density Plan).
.0203 Harbor Boulevard. A minimum of fifty percent (50%) of the required setback area immediately adjacent to the restaurant outdoor dining area, excluding driveways perpendicular to the street, shall contain live landscape materials; and .0204 Katella Avenue. A minimum three (3) foot wide area of the required setback area between any restaurant outdoor dining area and the public right-of-way shall contain live landscape materials.
.030 Location of Parking Areas. No parking areas shall be located between the ultimate public right-of-way and the actual (constructed) building setback provided, however, that vehicular drop-off areas may be located adjacent to the front of a building, but not in the required minimum setback area.
.040 Lighting. Fluorescent, low-pressure sodium, high pressure sodium, and mercury vapor are prohibited in the front setback areas. (Ord. 5689 § 5; July 13, 1999; Ord. 5920 § 1 (part); June 8, 2004; Ord. 6022 § 19; May 25, 2006.)

18.114.110 OFF-STREET PARKING AND LOADING REQUIREMENTS.

With the exception of parking areas within the Parking District, for employees of the Theme Park and Southeast Districts, and other parking lots intended for Speed Parking procedures as defined in Section 18.114.030 (Definitions), all vehicle accessways and parking and loading areas shall comply with the provisions of Chapter 18.42 (Parking and Loading), except as provided herein. .010 Minimum Parking Requirements.
.0101 Parking Requirements for Theme Parks and Associated Uses. .01 Theme park parking shall be provided at the rate of one (1.0) space for each one thousand (1,000) persons of estimated annual attendance with a minimum of twenty-four thousand five hundred (24,500) parking spaces provided for both employees and guests for the theme parks and associated uses at build-out.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-60
.02 For retail entertainment center uses, parking shall be provided at the rate of one (1.0) space for each one thousand (1,000) persons estimated non-theme park incremental annual attendance.
.03 Required parking spaces may be provided either within the Parking District or other Districts contained within this Zone.
.0102 Parking Requirements for Hotels and Associated Uses in the Theme Park and Southeast Districts. The following number of parking spaces shall be provided:

Four-fifths (0.8) of a space for each guest room. One-tenth (0.1) of a space per seat of eating/ drinking capacity plus six and seven-tenths (6.7) spaces for each one thousand (1,000) square feet of banquet/ meeting room areas, plus the following employee spaces: one-quarter space (.25) for each employee working in guest room areas; two (2.0) spaces per one hundred (100) seats of eating/drinking capacity; one (1.0) space per each one thousand (1,000) gross square feet of retail space. .0103 Minimum Parking Requirements for Administrative Office Facilities.

Administrative Office Facilities within the Theme Park District contained within a building of more than fifty thousand (50,000) gross square feet shall provide parking spaces within the Theme Park District adjacent to such administrative facilities. The required parking may be located within a parking facility or in surface parking lots and shall be provided at the following rates:
.01 Buildings three (3) stories or less: Four (4.0) spaces for each one thousand (1,000) gross square feet.
.02 Buildings greater than three (3) stories: Three (3.0) spaces for each one thousand (1,000) gross square feet.
.0104 District A and C-R and Anaheim GardenWalk Overlay Parking Requirements. The minimum number, type and design of off-street parking spaces for uses developed in District A or under the provisions of the C-R or Anaheim GardenWalk Overlays shall comply with the requirements of Chapter 18.42 (Parking and Loading). (Ord. 5580 § 25; October 22, 1996: Ord. 5689 § 6; July 13, 1999: Ord. 6022 § 20; May 25, 2006.)
.020 Location of Required Parking Spaces. All parking areas shall comply with the provisions of Subsection 18.42.50 (Location of Parking and Shared Parking Arrangements) and subsection

18.114.050.090 (Permitted Encroachments into Required Yard and Setback Areas), with the following exceptions:
.0201 Parking spaces constructed to serve theme park uses identified in subsections

18.114.060.10 (Theme Park – Permitted Primary Uses and Structures) and

18.114.060.020.0201 (Theme Park Accessory Support Facilities) shall be exempt from the provisions of this requirement.
.0202 Parking spaces required for hotel uses and hotel accessory support uses may be located in another District, subject to the submittal of a Letter of Justification for the The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-61
review and approval of the City Traffic and Transportation Manager. The Letter of Justification shall include the following information:
.01 Name of the District where the parking spaces are proposed to be located and a map showing the proposed number and location of the parking spaces and distance to the hotel;
.02 Reason why the parking spaces are proposed to be located in another District, including whether the request is to address a temporary event or a permanent location;
.03 Documentation demonstrating that locating hotel parking spaces in another District will not result in a reduction in the number of code required spaces for that other District;
.04 Pedestrian path of travel; and
.05 Other Information. Such other information as is deemed necessary by the City Traffic and Transportation Manager.

If the distance between the hotel and the parking lot or parking structure in the other District is not a reasonable walking distance, as determined by the City Traffic and Transportation Manager, a shuttle service shall be provided between the parking lot and the hotel ongoing during operation of the hotel.
.030 Layout and Design.
.0301 Layout and Design of Surface Parking Areas.
.01 All surface parking areas and vehicle accessways shall comply with the requirements of Section 18.42 (Parking and Loading), with the exception of parking spaces constructed for theme park and retail entertainment center uses, which shall conform to Exhibit 5.7.8d (Public Parking Facility Layout) of the Specific Plan and be operated using Speed Parking procedures as defined in Section 18.114.030 (Definitions), and for employees of the Theme Park District, Southeast District and Parking District, which shall conform to the Exhibit 5.7.8f (Employee Parking Layout) of the Specific Plan and the provisions of the Design Plan, which shall be exempt from the provisions of this requirement.
.02 Parking areas shall comply with the following:
(a) Curb. Where parking abuts landscaped areas, a curb of a minimum height of six inches shall be provided.
(b) Employee Parking Facility Landscape Setback. Employee parking facilities shall be surrounded by a landscaped area with a minimum width of 10 feet, except as noted in .0802 of subsection 18.114.110.080 (Parking Markings and Separation).

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-62
.0302 Parking Structure Design – Parking District. All Parking Structures in the Parking District shall conform to the Exhibit 5.7.8d (Public Parking Facility Layout) of the Specific Plan and be operated using Speed Parking procedures as defined in Section

18.114.030 (Definitions), the provisions of the Design Plan, and the following requirements:
.01 A visual barrier shall be provided along the edges of each level of the parking structure to conceal complete views of parked vehicles. .02 Engineering Standard Details pertaining to commercial drive approaches shall not apply to the parking facility. (Ord. 5580 § 26; October 22, 1996: Ord. 5998 § 66; October 25, 2005.)
.03 Sound Attenuation. A noise study shall be prepared to identify appropriate sound attenuation measures in conjunction with a proposed parking structure. .0303 Parking Structure Design – General. All Parking Structures shall conform to the provisions of the Design Plan and the following requirements:
.01 A visual barrier shall be provided along the edges of each level of the parking structure to conceal complete views of parked vehicles. .02 Sound Attenuation. A noise study shall be prepared to identify appropriate sound attenuation measures to be implemented in conjunction with a proposed parking structure.
.040 Hotel/Motel/Vacation Ownership Passenger Drop-off Areas. All hotel/motels and vacation ownership resorts shall have a passenger drop-off area located on-site. Passenger drop-off areas (which may include a covered area or porte-cochere) shall be for the purpose of dropping off and picking up passengers and luggage, accommodating valet parking, pedestrian access and safety, and fire access while providing free flow of vehicles. Such areas shall not encroach into the required front yard setback, except as provided in Section

18.114.050.090 (Permitted Encroachments into Required Yard and Setback Areas) and Section 18.114.100.100 (Permitted Encroachments into Required Yard and Setback Areas). .050 Parking Lot Plan Review. Parking lot plans, including parking facilities, shall be subject to review and approval by the Planning and Building Department and the City Traffic and Transportation Manager during Final Site Plan Review, if required by this chapter, and building plan review and prior to issuance of building permits and shall, at a minimum, incorporate all applicable City Standards and shall contain the following information:
.0501 Dimensions for internal spacing, circulation and landscaped areas; .0502 Curbing, stall markings, signing and other traffic control devices; .0503 Location and height of lighting fixtures;
.0504 Location, dimensions and accessibility of trash containers for refuse trucks; .0505 Location of fire hydrants and fire accessways;
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-63
.0506 Location and height of perimeter walls;
.0507 Tour bus and/or shuttle parking and loading;
.0508 Grade elevations and ramps associated with driving and parking facilities; .0509 General location of utility devices and other related above-ground features; and, .0510 Exhibit and/or delivery truck parking/loading areas and bicycle racks. (Ord. 5580 § 27; October 22, 1996.)
.060 Paving. All permanent and temporary off-street parking facilities, including access aisles and driveways, shall be permanently paved (not to include turf block). Such surfacing, as well as striping, signing, and directional markings, shall be maintained in good condition at all times. .070 Temporary Parking. Temporary parking facilities shall be paved and screened with landscaping, and shall be subject to the review and approval of the City Traffic and Transportation Manager. Such facilities may be permitted for a period of one (1) year, but may be renewed for up to a total of five (5) years in one (1) year increments subject to the review and approval of the City Traffic and Transportation Manager. .080 Parking Markings and Separations.
.0801 With the exception of parking spaces and facilities located in the Parking District and/or for theme park and retail entertainment center uses, all parking spaces shall be clearly and permanently outlined on the surface of the parking facility in accordance with the applicable City Standards on file in the office of the Director of Public Works and Planning Director pertaining to off-street parking and parking structures. .0802 Parking shall be separated from buildings, sidewalks and plazas by landscaped areas having a minimum width of five (5) feet.
.0803 Parking shall be separated from any abutting property line, by a minimum six (6) inch curb, and shall be screened from view of public rights-of-way and adjacent properties. (Ord. 5580 § 27A; October 22, 1996: Ord. 5998 § 67; October 25, 2005.) .090 Driveway Abandonment. When use of a driveway to a public street is abandoned or otherwise discontinued, the owner, upon receipt of notice from the Engineering Department, shall remove all driveway pavement, curb and gutter; and shall replace the curb, gutter and sidewalk, and landscape the area to match the adjacent landscaped areas. .100 Required Improvement of Parking Areas. Surface parking areas for hotels in the Theme Park District and the Southeast District and for uses developed in District A or under the provisions of the C-R Overlay, shall be improved in compliance with Section 18.42 (Parking and Loading); provided further that all portions of vehicular parking lots not used for parking stalls or circulation shall be planted, irrigated and maintained in accordance with the standards listed below and the Design Plan.
.1001 Minimum Number of Trees. Surface parking areas shall be landscaped and maintained with a minimum of one (1) twenty-four (24) inch box tree per each five The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-64
(5) parking spaces, which trees shall be equally spaced. Tree wells shall be designed with decorative paving and/or landscaped with shrubs and/or ground cover. .1002 Size of Planters. There shall be an average of forty-eight (48) square feet of planter area provided for each tree required in the above subsection with a minimum dimension of five (5) feet, provided that the planter area for new trees planted in existing legal nonconforming parking lots may be reduced to a minimum dimension and design approved by the City Traffic and Transportation Manager .1003 Minimum Width of Perimeter Landscaping. Parking facilities shall have a landscaped area with a minimum width of ten (10) feet provided along the peripheral edges of the parking facilities. Such areas shall be landscaped and maintained with a combination of shrubs, ground cover and trees. Adjacent to parking facilities, trees shall be provided and maintained consisting of at least one (1) twenty four (24) inch box tree for each ten (10) linear feet of parking facility perimeter. Such trees may be either grouped informally or formally.
.1004 Exceptions. Parking Facilities in any District intended primarily for employees of the theme parks, retail entertainment center uses, and hotels, or for use by theme park visitors, shall be exempt from the provisions of subsections .1001 and .1002 above. (Ord. 5580 § 28; October 22, 1996.)
.110 Conformance with the Design Plan. Tree, shrub and ground cover selection and planting design shall conform with the Design Plan.
.120 Parking Space and Access Design. Layout and design of parking areas and vehicle accessways in the Theme Park District within approximately 1,300 feet of the eastern side of the ultimate right-of-way of Walnut Street, as shown in Exhibit 5.8.3b (Theme Park District Concept Plan – B) (except for parking for theme park and retail entertainment center uses), District A and the C-R and Anaheim GardenWalk Overlays only, shall comply with the requirements of Sections 18.42.060 (Parking Dimensions and Access) and 18.42.070 (Parking Lot Design) and the applicable City Standards on file in the office of the Director of Public Works and Planning Director pertaining to off-street parking and parking structures, except as follows:
.1201 Maximum Curb Openings per Street Frontage. A maximum of twenty-five percent (25%) of any street frontage may be used for curb openings; except when the street frontage is less than one hundred (100) feet but not less than twenty-five (25) feet, in which case there shall be a maximum of one (1) twenty-five (25) foot wide curb opening. The maximum number of curb openings per street frontage shall not exceed the following standards:
.01 Parcel frontage three hundred (300) feet or less: One (1). .02 Parcel frontage three hundred one (301) to six hundred (600) feet: Two (2). .03 Parcel frontage greater than six hundred (600) feet: Four (4).

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-65
.04 One (1) additional curb opening may be allowed if it is used as legal access to one (1) or more adjacent parcels subject to the approval of the City's Traffic and Transportation Manager.
.05 Access required and limited to emergency vehicles or access to utility easements shall not be considered as curb openings as provided in this section. .1202 Driveway Separation and Spacing. There shall be a minimum distance of thirty-six (36) feet between driveways (nearest driveway edge to nearest driveway edge) serving the same parcel, and a minimum distance of forty (40) feet between driveways (nearest driveway edge to nearest driveway edge) serving adjacent parcels, except as otherwise approved by the City’s Traffic Engineer. .1203 Driveway Width Dimensions. Driveways shall be a minimum of twenty-five (25) feet wide in accordance with the Design Plan, with wider widths subject to the approval of the City's Traffic and Transportation Manager based on sound engineering practices.
.1204 Curb Return. The curb cut shall provide a minimum radius curb return and sight distance clearance in accordance with the applicable Engineering Standard Details on file in the office of the Director of Public Works pertaining to commercial driveway approaches or as otherwise approved by the City's Traffic and Transportation Manager based on sound engineering practices. .1205 Entry Drive Dimension. A minimum entry driveway (throat) of forty (40) feet shall be provided, measured from the nearest point of the ultimate street right-of-way line to the nearest point of the on-site parking area or on-site vehicular accessway to said parking area. Parking shall be designed so as to preclude a car from backing out of a stall and into the forty (40) foot entry drive, in accordance with the applicable City Standard on file in the office of the Direct of Public Works and Planning Director pertaining to minimum off-street parking standards. (Ord. 5580 § 29; October 22, 1996: Ord. 5689 § 7; July 13, 1999: Ord. 5998 § 68; October 25, 2005: Ord. 6022 § 21; May 25, 2006.)
.130 Truck Loading. Truck loading facilities shall comply with the requirements of Section

18.42.100 (Loading Requirements) and the applicable City Standards on file in the office of the Director of Public Works and Planning Director pertaining to truck dock standards. A minimum of one (1) truck dock or truck loading area shall be provided for each hotel or motel. (Ord. 5998 § 69; October 25, 2005.)
.140 Bus Parking Areas. Hotels/motels shall provide on-site bus parking subject to the approval of the City's Traffic and Transportation Manager and Planning Department in accordance with the latest Orange County Transportation Authority (OCTA) Bus Facilities Handbook Guidelines, or as otherwise approved by the City's Traffic and Transportation Manager and Planning Director based on sound engineering practices. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5420 §§ 7-9; April 12, 1994; Ord. 5920 1 (part); June 8, 2004: Ord. 6286 §§ 48 - 52; September 3, 2013.)
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-66

18.114.120 REQUIREMENTS FOR VACATION OWNERSHIP RESORTS. .010 Purpose of Section. The City Council has determined that vacation ownership resorts constitute a commercial use similar to hotel/motel facilities. Due to the mixed method of operation, hybrid ownership, the potential generation of large numbers of people and vehicles, and the potential impact on the City's tourism-related facilities, special criteria are warranted for the development of vacation ownership resorts in addition to the requirements of the underlying zone.
.020 Limits on Occupancy. Occupancy, or right of occupancy, of any vacation ownership resort unit (including different units within the same facility) in a vacation ownership resort facility by a person or entity shall be limited to no more than thirty (30) consecutive days nor more than a total of sixty (60) days during any consecutive twelve (12) month period. Units which do not meet such criteria shall be considered to be residential units and shall be prohibited. .030 Required Zoning. Vacation ownership resorts and conversions to vacation ownership resorts shall be permitted in the Theme Park and Southeast Districts subject to the requirements of subsection 18.114.050.020 (Limitation of Total Number of Hotel Guest Rooms or Suites) and in District A and the C-R Overlay subject to the requirements of subsection

18.114.120.050 (Development Standards) and in the Anaheim GardenWalk Overlay subject to the requirements of section 18.114.105 (Anaheim GardenWalk Overlay). (Ord. 6022 § 22; May 25, 2006.)
.040 Related Uses. Vacation ownership resorts may include other uses, either as accessory uses to the vacation ownership resort use or as independent facilities, so long as the specific use is allowed by the relevant District or C-R or Anaheim GardenWalk Overlay designation.

Such uses shall meet all City laws and requirements. (Ord. 6022 § 23; May 25, 2006.) .050 Development Standards. The development standards established in the relevant District or C-R or Anaheim GardenWalk Overlay designation shall be applicable to vacation ownership resort and the conversion of existing facilities to vacation ownership resort use. In the Theme Park District and Southeast District, facilities, amenities or design features usually associated with hotels/motels (for example, lobbies, check-in areas, registration desks, service closets, laundry facilities, and the like) shall be provided to the satisfaction of the Planning Director to ensure that the vacation ownership resort will adequately function in the same manner as a hotel/motel facility. In these Districts, kitchen facilities suitable for visitors are permitted as part of the vacation ownership resort. In District A and in the C-R Overlay, additional requirements may be imposed as follows:
.0501 Setback, height, landscaping, signage requirements and recreational amenities.

Additional restrictions may be required to ensure that the facility is adequately buffered from surrounding uses.
.0502 Parking. Additional parking may be required if the design of the facility and units indicates that additional parking is necessary.
.0503 Required facilities. The Planning Commission and/or City Council may require the provision of facilities, amenities, or design features usually associated with The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-67
hotels/motels (for example, lobbies, check-in areas, registration desks, service closets, laundry facilities, and the like) to ensure that the vacation ownership resort will adequately function in the same manner as a hotel/motel facility. .0504 Kitchen facilities suitable for visitors may be permitted by the conditional use permit permitting the vacation ownership resort. (Ord. 6022 § 24; May 25, 2006.) .060 Conversion to Vacation Ownership Uses. The following standards shall apply to conversions of existing facilities to vacation ownership resort uses. Any conversion of an existing facility to vacation ownership resort use shall be required to meet the same standards as new facilities.
.0601
.01 Theme Park District and Southeast District. The conversion of any type of existing unit or facility to vacation ownership resort use shall be subject to the approval by the Planning Director, who will determine substantial conformance with the Specific Plan. Conversion shall be evaluated in terms of the physical suitability of the units or facilities for vacation ownership resort use. Items to be considered shall include the general maintenance and upkeep of the structures; general physical condition of the facility; age of the structures; suitability of the units for the type of occupancy proposed; the age, condition, and general repair of any recreational facility; and conformance with appropriate building, safety and fire standards. The facility shall be upgraded to mitigate any identified deficiencies.
.02 District A, C-R Overlay and Anaheim GardenWalk Overlay. The conversion of any type of existing unit or facility to vacation ownership resort use shall be subject to the approval of a conditional use permit. Conversion shall be evaluated in terms of the physical suitability of the units or facilities for vacation ownership resort use. Items to be considered shall include the general maintenance and upkeep of the structures; general physical condition of the facility; age of the structures; suitability of the units for the type of occupancy proposed; the age, condition, and general repair of any recreational facility; and conformance with appropriate building, safety and fire standards. The facility shall be upgraded to mitigate any identified deficiencies. Conversions shall also be evaluated to ensure that the conversion does not create or add to the shortage of the particular type of unit proposed to be converted in the City as a whole or in any particular area of the City.
.0602 All facilities converted to vacation ownership resort use shall meet all applicable City requirements, including building, safety, and fire standards, as well as the other requirements of this section.
.0603 District A, C-R Overlay and Anaheim GardenWalk Overlay. Conversions which would significantly reduce the overall number of conventional overnight accommodations in the City for visitors shall not be allowed. The effect of the The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-68
conversion on existing conventional overnight accommodations shall be quantified by means of a survey prepared to the satisfaction of the City. The survey shall include a representative sample of the existing unit supply in terms of location, price and type of unit. (Ord. 5580 § 30 (part); October 22, 1996.)
.070 Information Required for Applications. In addition to any information requirements established by other applicable sections of the Anaheim Municipal Code, the following information shall also be submitted as part of any application to develop or institute a vacation ownership resort:
.0701 Typical floor plans for each vacation ownership resort unit type; .0702 The phasing of the construction of the vacation ownership resort use; .0703 The type of vacation ownership resort method to be used (fee simple, leasehold, tenancy-in-common, license, membership, and the like) and how such use may be created;
.0704 The identification of vacation resort intervals and the number of intervals per unit; .0705 Identification of which units are in the vacation ownership resort program, the use of the units not included in the program, and the method whereby other units may be added, deleted, or substituted;
.0706 A description and identification of any accessory uses which are proposed in conjunction with the vacation ownership resort;
.0707 A description of the availability of the vacation ownership resort project, including accessory uses, to the general public;
.0708 The provisions made for management and maintenance of the project and indication of a contact person or party responsible for the day-to-day operation of the project; .0709 A description of the type and operation of any other uses (commercial and/or recreational) which are included in the facility;
.0710 The formula, fraction or percentage, of the common expenses and any voting rights assigned to each vacation ownership resort unit and where applicable, to each unit within the project which unit is not subject to the vacation ownership resort program; .0711 Any restrictions on the use, occupancy, alteration, or alienation of vacation ownership resort units;
.0712 A parking demand study prepared by an independent traffic engineer licensed by the State of California or such other study as approved by the City Traffic and Transportation Manager and provided to the City by the applicant at applicant's sole expense;
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-69
.0713 A description of the method to be used consistent and in compliance with the provisions of Chapter 2.12 (Transient Occupancy Tax) of the Anaheim Municipal Code, to collect and transmit the transient occupancy tax to the City; .0714 Other information or documentation:
.01 Theme Park District and Southeast District. Any other information or documentation the applicant, City staff, or the Planning and Building Director deems reasonably necessary to the consideration of the project; .02 District A, C-R Overlay, Anaheim GardenWalk Overlay. Any other information or documentation the applicant, City staff, or the Planning Commission deems reasonably necessary to the consideration of the project, including any required environmental or fiscal impact report documents; and,
.0715 Applications for the conversion of any portion of an existing facility to a vacation ownership resort shall include the following information, as well as the other information required by this section:
.01 A property report describing in detail the condition and useful life of the roof, signs, foundations, and mechanical, electrical, plumbing, and structural elements prepared by a licensed engineer, an architect, or general engineering contractor; .02 A comprehensive list of all improvements, upgrading, and additional facilities proposed; and,
.03 A report, prepared by a licensed engineer or architect, describing all repairs and replacements needed, if any, to bring all structures into substantial compliance with the Uniform Building Code, Uniform Housing Code, National Electrical Code, Uniform Plumbing Code, Uniform Fire Code, Uniform Mechanical Code, and any other uniform building related codes as modified and adopted by the City. Approval shall be subject to receipt of such information and applicant's failure to submit such documentation may be grounds for disapproval. (Ord. 5580 § 30 (part); October 22, 1996.)
.080 Building Permits. Prior to issuance of a building permit, the legal property owner shall be required to provide the following:
.0801 Copies of all relevant enabling documentation, including, but not limited to, articles of incorporation, bylaws, declarations of covenants, conditions, and restrictions, and membership or license agreements; and,
.0802 Copies of all State Department of Real Estate applications and permits, including any public report issued.
.090 District A, C-R Overlay and Anaheim GardenWalk Overlay - Findings of Fact Necessary for Approval. In addition to the findings of fact otherwise required by any other provision of the Anaheim Municipal Code, approval of any conditional use permit for a vacation ownership resort shall require the following finding: that there are adequate visitor-serving facilities in The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-70
the City and that the project will not preclude or significantly reduce the development of other needed tourist facilities or hotel or motel facilities. .100 Vacation Ownership Resort Subject to Transient Occupancy Tax. Notwithstanding any other provision of the Anaheim Municipal Code, all vacation ownership resort units shall be subject to the payment of the transient occupancy tax as otherwise prescribed by Chapter

2.12 (Transient Occupancy Tax). Units occupied as traditional hotel/motel rentals shall have the tax levied on the rent paid. Units occupied on a vacation ownership resort basis shall have the tax levied on the basis of the equivalent rental rate which would be charged for that particular unit if it were to be rented as a traditional hotel/motel rental unit. The owner and manager of the vacation ownership resort shall jointly and severally be responsible to provide sufficient data to the City to justify the equivalent rental rate used in calculating the transient occupancy tax. The manager of the facility (or if the facility has no manager, the owner of the facility) shall be deemed the "operator" within the meaning of Chapter 2.12 (Transient Occupancy Tax) for purposes of collection and remittance of the tax. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5420 § 13; April 12, 1994; Ord. 5920 § 1 (part); June 8, 2004.)

18.114.130 SIGN REGULATIONS.

The purpose of this section is to recognize the function of signs in this Zone, to provide for their inclusion under this section of the Anaheim Municipal Code, and to regulate and control all matters relating to such signs, except the construction thereof. .010 Definitions Pertaining to Signs. For the purpose of this chapter, the following abbreviations, terms, phrases and words shall be construed as specified below:
.0101 Animated Sign. Any sign that uses movement or change of lighting to depict or simulate movement, action or to otherwise create a special effect or scene. .0102 Area of Sign. The area of a sign shall include the entire area within any type of perimeter or border which may enclose the outer limits of any writing, representation, emblem, logo, figure or character. The area of the sign having no such perimeter or border shall be computed by enclosing the entire area constituting the advertising message within the smallest polygon required to enclose all typographic/graphic elements, in compliance with the Design Plan. .0103 Balloon. Any air-filled or gas-filled balloon attached to a string, rope or similar ligature, and tethered to a fixed or moving place or object, including a motor vehicle. .0104 Banner. Any sign made of fabric, cloth, paper or other material that is fastened to a pole or building at one or more points. National flags, state or municipal flags, or the official flags of any institution shall not be considered banners. Pennants as defined herein shall be considered banners for purposes of this chapter. .0105 Beacon. Any light with one or more beams directed into the atmosphere or directed at one or more points not on the same parcel as the light source; also, any light with one or more beams that rotate or move.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-71
.0106 Billboard or Off-Premises Sign. A structure or sign of any kind or character upon which any poster, bill, printing, writing, painting, graphic or other display of any kind or nature whatsoever may be placed for advertising purposes and which structure is erected, maintained or used for the purpose of advertisement of goods produced, sold or available for sale, or services available or rendered, at locations other than the premises upon which the structure is located. The term "billboard" or "off-premises sign" shall not include:
.01 Official notices issued by any court or public body or officer; .02 Notices posted by any public officer in performance of a public duty or by any person in giving legal notice;
.03 Directional, warning or information structures required or authorized by law or by Federal, State, County or City authority;
.04 A structure which contains solely the name of the City and the names of, or any other information regarding, civic, fraternal or religious organizations located therein;
.05 Guide signs, on-premises signs, business signs, and temporary real estate signs as defined in Section 18.114.130 (Sign Regulations).
.0107 Business Information Sign. Any informational sign (not a project identification sign) on the project premises that relates to the principal business or use of the premises upon which the sign is erected. This sign type may include signs which direct attention to a business commodity, service, or other activity which is sold, offered, or conducted on the premises upon which the sign is located, or to which it is affixed. .0108 Can-Type Sign. A box-shaped sign which has copy on the outside of its surface and is internally illuminated.
.0109 Canopy Sign. Any sign that is a part of or attached to an awning, canopy, or other fabric, plastic, or structural protective cover over a door, entrance, window, or outdoor service area. A marquee sign as defined herein is not a canopy sign. .0110 Changeable Copy Sign. A sign or portion thereof, including but not limited to electronic message boards, with characters, letters, or illustrations that can be changed or rearranged without altering the face or the display surface of the sign. .0111 Company Symbol/Logo. An identifying mark, emblem or character that can either be used alone or in combination with a company name to represent or identify a company or business.
.0112 Company Name. The full spelling of the name of the business. .0113 Cornice. Any prominent, continuous horizontally projecting feature extending from a wall or other construction.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-72
.0114 Display Surface. The surface of the sign structure available for the mounting of material, or the electronic message board, to carry an advertising message, trademark, emblem or logo.
.0115 “Dual-Lit Channel Letters.” Individual letters formed as a sign can structure, composed of opaque sides and transparent acrylic plastic on both the front and back of the letter. Lighting from within the sign can structure creates an illuminated face and a halo around the letterform.
.0116 Emitting Sign. Any sign that releases smoke, steam, water, bubbles or other solids, liquids or gases as a device for advertising.
.0117 Electronic Message Board. A changeable copy sign upon which the copy is displayed or changed by electronic means.
.0118 Entrance/Exit Signs. A sign located at a driveway entrance displaying a directional symbol and/or directional copy and which may include the name and/or symbol/logo of the primary business establishment.
.0119 Exposed Neon Signs. A sign where the neon or argon/mercury illuminated glass tubing is visible and not shielded from view by any material or sign structure. .0120 Flag. Any fabric attached to a flagpole and complying with subsection

18.114.050.090.0909 (Flagpoles Permitted), and containing distinctive colors, patterns, or symbols, and used as a symbol of a government or other entity. .0121 Flashing Sign. Any sign designed to operate under conditions of intermittent illumination which operates in a manner to create the illusion of being on and off. .0122 Freestanding Monument Sign. A sign which is permanently attached to the ground by means of a permanent base and which is independent from any building or other structure.
.0123 Illegal Sign. Any sign or advertising display constructed or erected without first complying with all applicable ordinances and regulations in effect at the time of its construction, erection or use.
.0124 Informational, Regulatory and Directional Sign System (IRD Sign System). Any group of signs that are intentionally designed to be a unified family of signs through a consistent use of color, typography, graphics, design detailing and structural detailing.
.0125 Lighter Box Sign. An illuminated sign that contains words, numbers or symbols, designed to be an integral part of the architecture of a service station, and intended to be placed above the fuel pumps of a service station for purposes of providing light for the working area and commercial identification.
.0126 Location. A lot, site, premises, building, wall or any place whatsoever upon which a sign is erected, constructed or maintained.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-73
.0127 Magnetic Sign. A sign which is magnetically attached to a surface. .0128 Marquee (Changeable Copy) Sign. A sign which is characterized by changeable copy whether said sign is a wall sign or whether said sign projects from and is supported by a building.
.0129 Monument Sign. A large freestanding sign structure used primarily as an identity sign for a building or project. It is usually oriented for vehicular view along roadways. Monument signs are often used at entries to a building or project and may incorporate landscaping or other site elements such as a wall. Monument signs may have either a horizontal or vertical orientation and may require a foundation. .0130 Nameplate. Any lighted or unlighted sign mounted on or near an entry that identifies the name and occupation or profession of the occupant of the premises and shall be part of the IRD sign system for the property.
.0131 Noncommercial Message Signs. Signs displaying political or social (public information) messages.
.0132 Nonconforming Sign. Any sign that complied with all applicable ordinances and regulations in effect at the time it was erected, but which does not conform to one or more of the requirements of this chapter.
.0133 Off-Site Sign. Any sign not located on the same parcel to which such sign message pertains.
.0134 On-Site Directional Guidance Sign. Any sign located on-site and not visible from the public right-of-way, giving direction for on-site pedestrian or vehicular circulation.
.0135 On-Site Directory Sign. Any on-site sign exhibiting the names and locations of onsite uses and/or facilities, and intended to facilitate the movement of patrons or visitors throughout the site.
.0136 On-Site Sign. Any sign located on the same parcel to which such sign message pertains.
.0137 Open Pan Channel Letter with Interior Neon Illumination. Individual channel letters formed as a sign can structure with neon tubing molded to fit the interior wall of the sign can and fitted with a clear transparent face panel allowing the halo from the neon tubing to be visible through the transparent face panel. .0138 Outdoor Advertising. Advertising on any board, fence, sign device, structure or building, or the placing thereon of any poster, bill, printing, painting, device or any advertising matter of any kind whatsoever; and the pasting, posting, printing, painting, nailing or tacking or otherwise fastening of any handbill, card, banner, sign, poster, advertisement or notice of any kind upon any property or place. Said term shall not include any signs or notices posted or displayed by any public officer in the performance of a public duty or a private person in giving a legal notice.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-74
.0139 Parapet Wall Sign. A sign attached to a vertical wall extending from and above the actual roof line and intended to visually heighten the building. .0140 Pennant. Any plastic, fabric, or other material, whether or not containing a message of any kind, suspended from a rope, wire, string, or other similar device usually in series, designed to move in the wind.
.0141 Pole Sign. A sign which is affixed to one or more poles attached to the ground and which is constructed in a manner which does not fully obstruct the view of the area between the sign and the ground.
.0142 Portable Sign. Any sign not permanently attached to the ground or other permanent structure, or a sign designed to be transported, including, but not limited to, signs designed to be transported by means of wheels; signs converted to A-frames or Tframes; menu and sandwich board signs; balloons used as signs; umbrellas used for advertising; and signs attached to or painted upon vehicles parked and visible from the public right-of-way, unless said vehicle is used in the normal day-to-day transportation operations of the business.
.0143 Projecting Sign. A wall sign which projects from the face of a building. .0144 Pump Top Sign. Any sign atop a fuel dispensing pump, either affixed to or placed upon such pump. A lighter box sign is not a pump top sign. .0145 Raceways. A metal box containing wiring, transformers and housings for a sign. .0146 Real Estate Sign. Any sign and sign structure of a temporary nature relating to the sale, lease or other disposition of real property.
.0147 Roof Sign. A sign erected, constructed or maintained upon the roof of any building. .0148 Rotating or Revolving Sign. Any sign all or a portion of which moves, revolves or rotates in some manner.
.0149 Reverse Pan Channel Letters with Neon Halo Illumination. Individual letters formed as a sign can structure where the front surface is opaque and the back is open. Neon tubing is molded to fit the form of the can structure. The light from the neon shines out the opening in the back of the letter and reflects off the surface of the building or structure where the letter is mounted. At night, this reflection appears to be a halo around the opaque letter form.
.0150 Restaurant Menu Board. An illuminated or non-illuminated glass case used to display a restaurant menu. Said case may be built-in, visible through a window or affixed to the exterior building wall and shall be located immediately adjacent to the main entrance to the restaurant.
.0151 Sign. Any device, fixture, placard, or structure that uses any color, form, graphic, illumination, symbol, or writing to advertise, announce the purpose of, or identify The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-75
the purpose of a person or entity, or to communicate information of any kind to the public.
.0152 Sign Area. See definition for Area of Sign.
.0153 Sign Copy. Any characters, letters or type that constitutes the message of the sign exclusive of a company symbol or company name.
.0154 Storefront. A wall of a business containing display windows and a public entry. .0155 Structure. The supports, uprights, bracing, guy rods, cables and framework of a sign or outdoor advertising display.
.0156 Temporary Sign. Any sign that is used only temporarily and is not permanently mounted or affixed to the ground or any structure.
.0157 Typeface. The general form, structure style, or character common to all elements comprising an alphabet.
.0158 Wall Sign. A sign which is affixed to an exterior wall of any building or which is affixed to any structure or parapet attached to the wall of any building. .0159 Window Identification Sign. Any sign bearing only the name and/or logo and/or address of the business occupying the premises; and consisting of letters and/or numbers permanently affixed to the window, and made of gold leaf, paint, stencil, or other such material.
.0160 Window Sign. Any sign, picture, symbol, or combination thereof, designed to communicate information about an activity, business, commodity, event, sale, or service, that is placed inside a window or upon the window panes or glass of a building and which is visible from the exterior side of the window, excluding any window identification sign. (Ord. 5580 § 31 (part); October 22, 1996.) .020 Signs - General.
.0201 Application.
.01 Sign standards and regulations contained within this section shall apply to all Districts and the C-R Overlay within the Specific Plan area except as follows:
(a) Theme park and retail entertainment uses in the Theme Park and Southeast Districts. Sign standards contained in this section and other sign regulations contained within the Anaheim Municipal Code shall only apply to signs within the required setback adjacent to perimeter public streets. Wall signs for theme park and retail entertainment center uses adjacent to the required setback along perimeter public streets and adjacent to residential zoned properties, shall be internally oriented;
(b) Hotel and accessory uses in the Theme Park and Southeast Districts. Sign standards contained in this section and other sign regulations contained The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-76
within the Anaheim Municipal Code shall only apply to signs within the required setback adjacent to perimeter public streets or are otherwise visible to pedestrian or vehicular traffic from the adjacent public right-of-way measured six (6) feet above the grade of the sidewalk on the opposite side of the street and/or from residential zoned properties; (c) Theme Park, Southeast and Parking Districts – Interior Areas. Sign standards contained in this section and other sign regulations contained within the Anaheim Municipal Code shall not apply to interior areas of the Theme Park, Southeast and Parking Districts. For the purpose of this section, “interior areas” of the Districts are areas that are not visible to pedestrian or vehicular traffic from the adjacent public right-of-way (excluding the Magic Way public right-of-way abandoned by the City) measured six (6) feet above the grade of the sidewalk on the opposite side of the street and from residential zoned properties;
(d) Theme Park and Southeast Districts – Sign Lighting. Signs within these Districts shall comply with subsection 18.114.130.030 (Lighted Signs – General) for any sign visible from residential zoned properties; and (e) Theme Park District - Monorail. Theme Park related graphic imagery located on a monorail is permitted and not subject to Section 18.114.130 (Sign Regulations) requirements or other sign regulations contained within the Anaheim Municipal Code.
.02 Anaheim GardenWalk Overlay. Sign standards and regulations contained within this section shall apply to development in the Anaheim GardenWalk Overlay subject to the following exceptions:
(a) Signs, objects or structures located in the interior areas of the Anaheim GardenWalk project shall be exempt from the requirements set forth in Section 18.114.130 (Sign Regulations). Signs, objects or structures shall be considered to be located in an “interior” area for the purposes of this section if they are:
(i) Not visible to pedestrian or vehicular traffic from the public right-ofway at an equal elevation as the Anaheim GardenWalk property line (measured five (5) feet above the grade of the sidewalk on the opposite side of the street from the Anaheim GardenWalk project); or (ii) For Anaheim GardenWalk Overlay, Area A, at least one hundred sixty (160) feet from the adjacent public right-of-way or correspond with the setback of the last building bordering the view corridor, whichever is further, and are visible only to pedestrian and/or vehicular traffic through limited view corridors at the entrances to the Anaheim GardenWalk project. The final dimensions of the view corridor shall be shown on the Final Site Plan; or
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-77
(iii) For Anaheim Gardenwalk Overlay, Area B, the Planning Commission shall review and approve an exhibit submitted as part of the Final Site Plan which identifies interior areas and the view corridor consistent with criteria set forth in subparts 18.114.130.020.0201.02 (a)(i) and (ii) (Signs - General).
(b) Icon/themed signage elements, as defined in subparagraph

18.114.130.060.0602.05 (Conditionally Permitted Signs) may be permitted subject to approval of a conditional use permit as set forth therein.
(c) On-site Informational, Regulatory and Directional (“IRD”) Signs. IRD Signs visible from the public right-of-way shall comply with the following:
(i) The maximum sign area shall be eight (8) square feet. (ii) The design, location and number of signs shall be approved as part of the Coordinated Sign Program with the Final Site Plan for the Lifestyle Retail and Entertainment Complex.
(iii) If a company symbol or logo is included in the sign copy, said symbol or logo shall occupy a maximum of twenty-five percent (25%) of the sign area.
(iv) An IRD sign may encroach into the required minimum setback abutting the adjacent public right-of-way provided that the location of the sign shall comply with the applicable Engineering Standard Details on file in the office of the Director of Public Works pertaining to commercial driveway approaches and relating to line-of-sight standards.
(d) Business and Identification Signs for Anaheim GardenWalk Overlay, Area A. Business and identification signs located in the exterior areas of the Anaheim GardenWalk project shall be developed in accordance with the Coordinated Sign Program approved in conjunction with Conditional Use Permit No. 4078, as the same may be amended from time to time. Business identification signs are defined as those signs intended to advertise individual tenants of the Anaheim GardenWalk project (excluding vacation ownership resort units) and may consist of wall signs and/or freestanding signs. Prior to the issuance of sign permits, plans shall be submitted to the Planning and Building Department indicating conformance with the Coordinated Sign Program. Business identification signs shall be considered to be located in an “exterior” area of the project for the purposes of this section if they are not otherwise considered as “interior”, as defined in Section 18.114.130.020.0201.02(a). Amendments of the Coordinated Sign Program shall be processed as an amendment to Conditional Use Permit No. 4078 in compliance with Chapter 18.66 The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-78
(Conditional Use Permits) and shall be subject to the following additional findings of fact:
(i) Signs shall complement the architecture of the buildings on the same property and provide a unifying element along the streetscape; and (ii) The size, scale and style of signs shall be internally consistent and consistent with the scale of the buildings located on the same property and the surrounding land uses. (Ord. 6221 § 7; August 23, 2011: Ord. 6361 § 1; February 23, 2016.)
.0202 Administrative Provisions - Sign Regulations. The location, size, type, construction and all other matters relating to signs in the Specific Plan area, with the exception of theme parks and retail entertainment centers in the Theme Park and Southeast District, which shall be exempt from the provisions of this section and other regulations contained within the Anaheim Municipal Code governing signs, shall be regulated and controlled exclusively by the provisions of this chapter except to the extent reference is expressly made in this chapter to any other provision of the Anaheim Municipal Code. In the event of any conflict between the provisions of this chapter and any other provisions of the Anaheim Municipal Code so referenced herein, the provisions of this chapter shall govern and prevail. All signs and all applications shall therefore be exclusively administered by the Planning Director except those signs which may be sought in conjunction with a conditional use permit or a zone variance.
.0203 Coordinated Sign Program. All signs on a property shall be designed as part of a coordinated architectural, informational, regulatory and directional sign system with a consistent design detailing, typeface and color system. All multi-tenant signs shall either use one consistent typeface for all tenants or use one color for all sign copy.

The capital letter height of all tenant identification copy shall be the same on a single sign face. Multi-tenant wall signs shall either be all wall signs or all canopy signs except for as provided elsewhere in this chapter for hotel/motel accessory uses. .0204 Resolution of Inconsistent Provisions. Notwithstanding any other provision of this Code to the contrary, all provisions governing signs or advertising structures of any type in this Zone shall be contained within this chapter; provided, however, the provisions of Section 18.44.170 (Temporary Signs - Special Event Permit), and Chapters 4.04 (Outdoor Advertising Signs and Structures - General), 4.08 (Outdoor Advertising Signs and Structures - Near Freeways), and 4.09 (Advertising of Motel and Hotel Rental Rates)" of the Anaheim Municipal Code shall apply to signs and advertising structures in this zone to the extent such provisions are not inconsistent with this chapter .
.0205 Variances From Sign Requirements. No person shall install or maintain any sign in the Specific Plan area except as permitted herein; provided, however, that any requirements or restrictions may be waived in whole or in part upon such conditions as may be imposed by the Planning Commission or the City Council by a zone The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-79
variance processed and approved in accordance with all procedures, requirements and restrictions established for variances pursuant to Chapters 18.60 (Procedures) and 18.66 (Conditional Use Permits), and 18.74 (Variances). .0206 Signs Approved in Conjunction with Conditional Use Permits. Approval of any conditional use permit shall be deemed to constitute approval of any on-site signs which are otherwise permitted in the Specific Plan area unless, as part of the action approving the conditional use permit, more restrictive sign requirements are imposed.
.0207 Legal Nonconforming Signs - General. Any sign or other advertising structure of whatever type or nature, other than an illegal sign, which violates or otherwise does not comply with the applicable requirements of this chapter shall be subject to compliance with the regulations prescribed herein in the time and manner hereinafter set forth.
.01 Legal Nonconforming Signs-Continuation and Termination. Any legal nonconforming sign or sign structure in existence on the effective date of this chapter which violates or otherwise does not conform to the provisions hereof shall be removed, altered or replaced so as to conform to the requirements of this chapter (hereinafter the “abatement”) either:
(a) Within twelve (12) years from and after the date said sign first becomes nonconforming to the provisions of this chapter, or
(b) On or before December 31, 2005, whichever is later; provided, however, in no event shall such abatement be required unless and until the owner of said sign has received not less than one (1) year's advance written notice from the Planning Director of the City requiring the removal or alteration of sign. Notwithstanding the foregoing:
(i) Any advertising display which was lawfully erected, but whose use has ceased; or the structure upon which the display exists has been abandoned by its owner, for a period of not less than ninety (90) days, shall be removed, altered or replaced so as to conform to the provisions of this chapter within six (6) months from the date of receipt of a written order of abatement from the Planning Director of the City requiring such abatement. Costs incurred by the City in removing an abandoned display shall be borne by or charged to the legal owner of the real property upon which said sign is located.
(ii) Any advertising display structure which has been more than fifty percent (50%) destroyed, and the destruction is other than facial copy replacement, and said structure cannot be repaired within thirty (30) days of the date of its destruction shall be removed, altered or replaced so as to conform to the provisions of this chapter within six (6) months from the date of receipt of The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-80
a written order of abatement from the Planning Director of the City requiring such abatement.
(iii) Any advertising display, whose owner, outside of a change of copy, requests permission to remodel and remodels that advertising display, or expands or enlarges the building or land use upon which the advertising display is located, and the display is affected by the construction, enlargement, or remodeling, or the cost of construction, enlargement or remodeling of the advertising display exceeds fifty percent (50%) of the cost of reconstruction of the building shall remove, alter or replace such sign so as to conform to the requirements of this chapter in conjunction with said project.
(iv) Any advertising display for which there has been an agreement between the advertising display owner and the City for its removal as of any given date shall remove such sign per said agreement.
(v) Any temporary advertising display erected pursuant to a special events permit issued by the City shall be removed as specified under Section

18.44.170 (Temporary Signs - Special Event Permit) or within such other time as expressly authorized by the City.
(vi) Any advertising display which is an immediate danger to public health or safety shall be removed, altered or replaced so as to conform to the requirements of this chapter within thirty (30) days from the date of receipt of a written order of abatement from the Planning Director of the City requiring such removal or alteration.
(vii) Any advertising display which in the opinion of the City Traffic and Transportation Manager constitutes a traffic hazard not created by relocation of streets or highways or by acts of the City shall be removed, altered or replaced so as to conform to the requirements of this chapter within thirty (30) days from the date of receipt of a written order of abatement from the Planning Director of the City requiring such removal or alteration.
(viii) Any other advertising display for which the City is exempt from the payment of compensation in conjunction with requiring its removal as specified in Chapter 2.5 of Division 3 of the Business and Professions Code of the State of California, or any successor provisions thereto shall be subject to removal as specified in said Code.
(ix) Illegal Signs. Illegal signs as defined in subsection 18.114.130.010 (Definitions Pertaining to Signs) shall be removed, altered or replaced so as to conform to the requirements of this chapter within six (6) months following the effective date of this chapter.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-81
.0208 Regulation of Special Types of Signs - General. Notwithstanding any other provisions of this chapter, the following special types and classifications of signs shall be permitted subject to compliance with the limitations and conditions prescribed herein.
.0209 Signs Required By Law. Nothing contained in this chapter shall prevent the erection, location or construction of any sign on private property where such erection, location or construction of said sign is required by any law; provided, however, no such sign erected, placed or maintained pursuant to this provision shall exceed four (4) square feet in area except to the extent a greater sign area is expressly required by law. .0210 Signs in the Public Rights-of-Way. Signs shall be prohibited in any public rights-ofway as provided in Section 4.04.130 (Prohibition of Signs in the Public Right-ofWay), except signs, gateways and pedestrian bridges as described in the Public Facilities Plan and/or Design Plan of the Specific Plan, and private Anaheim Resort business identification freestanding monument signs within the ultimate public right-of-way along Katella Avenue, provided an Encroachment License or Agreement is approved for such signs by the Public Works Department. .0211 Political Campaign Signs. Notwithstanding any other provision of this chapter, political campaign signs shall be permitted on private property provided:
.01 Sight Distance. Such signs shall comply with the minimum sight distance requirements set forth in paragraph 18.114.130.020.0212 (Minimum Sight Distance Requirements for Freestanding Signs);
.02 Code Compliance. Such signs shall comply with the provisions of Section

4.04.130 (Prohibition of Signs in the Public Right-of-Way); and .03 Title 15 Compliance. Any structure to which a political sign is attached shall comply with all applicable provisions of Title 15 (Building and Housing) of the Anaheim Municipal Code, except that no building permit shall be required for a temporary political campaign sign having a surface area of thirty-five (35) square feet or less and which structure is removed within one hundred and twenty (120) days of its erection or placement, or within thirty (30) days after the election to which the sign relates, whichever occurs first. (Ord. 5580 § 31 (part); October 22, 1996: Ord. 5689 § 8; July 13, 1999: Ord. 5807 § 5; March 19, 2002.)
.0212 Minimum Sight Distance Requirements for Freestanding Signs. A line-of-site triangle is hereby established at each corner of every intersection of two (2) streets.

Two (2) legs of the triangle shall extend twenty-five (25) feet along the ultimate right-of-way line of each street right-of-way (except at the intersection of Harbor Boulevard and Katella Avenue where the legs of the triangle shall extend twentyfive (25) feet along the back of the sidewalk) and the third leg shall connect the termini of each of the other two (2) legs. No sign above twenty-four (24) inches (as measured from the finished grade of the adjacent sidewalk) in height shall be The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-82
permitted within the line-of-site triangle. Any freestanding sign installation located within fifty (50) feet of any driveway, including driveways on adjacent properties, shall meet the provisions of the applicable Engineering Standard Details on file in the office of the Director of Public Works pertaining to commercial driveway approaches.
(Ord. 5998 § 70; October 25, 2005: Ord. 6022 § 25; May 25, 2006: Ord. 6022 § 25; May 25, 2006.) .030 Lighted Signs - General. No artificial light of whatever type or nature used in conjunction with, or for the purpose of, lighting any sign shall be so erected or constructed or placed, nor shall any substance or material capable of reflecting light be so placed, as to result in directing such artificial light into any structure used exclusively for residential purposes.

For the purpose of this provision, structures devoted to hotel and motel use are not to be construed as structures used exclusively for residential purposes. .0301 Indirect Lighting. No sign lighted by any type of indirect lighting shall have any such lighting which exceeds eight hundred (800) milliamps rated capacity nor shall any sign lighted by neon or similar materials have any such neon or similar material which exceeds three hundred (300) milliamps rated capacity. .0302 Intensity of Illumination. The approval of any illuminated sign shall not be final until thirty (30) days after installation, during which period the Planning Director may order the dimming of any illumination found to be excessively brilliant and no sign permit shall be valid until such order has been carried out to an extent satisfactory to the Planning Director. For purposes of this section, illumination shall be considered excessively brilliant when it prevents normal perception of objects or buildings beyond or in the vicinity of the sign, or when it shines directly onto any residential zone or residentially developed property.
.0303 Lighter Box Sign. A lighter box sign:
.01 Shall be either single-faced or double-faced,
.02 Shall only be internally lighted,
.03 Advertising thereon shall be limited to the company name or logo only, and .04 Said name or logo shall not exceed twenty percent (20%) of the total area of each face of said sign.
.040 Real Estate Signs. Notwithstanding any other provision of this chapter, temporary real estate signs advertising property for sale, lease, rental or for inspection by the public shall be permitted subject to the following limitations:
.0401 On-Site Real Estate Signs. A maximum of one (1) unlighted, single-faced or doublefaced freestanding sign advertising property for sale, lease, rental, or other disposition of the property on which such sign is located shall be permitted on parcels of less than one-half (1/2) acre in area. On larger parcels, one such sign per each street or highway frontage of said parcel shall be permitted as provided herein.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-83
Any such sign(s) may also include the name, address, and phone number of the person, firm, entity or agent offering said premises for sale, lease, rental or other disposition.
.01 Sign Size: Parcels less than Twenty-Two Thousand (22,000) Square Feet in Area. The maximum area of each sign shall not exceed ten (10) square feet per sign face, and the height thereof as installed shall not exceed four (4) feet. .02 Sign Size: Parcels of Between Twenty-Two Thousand (22,000) and FortyThree Thousand (43,000) Square Feet in Area. The maximum area of each sign shall not exceed twenty-four (24) square feet per sign face, and the height thereof as installed shall not exceed four (4) feet.
.03 Sign Size: Parcels Forty-Three Thousand (43,000) Square Feet or More in Area. The maximum area of each sign shall not exceed forty (40) square feet per sign face, and the height thereof as installed shall not exceed four (4) feet. .050 Future Establishment Signs. The future establishment of a business or other activity on a parcel or lot may be advertised by means of on-site signage, subject to compliance with the following provisions:
.0501 Ownership of Property. The subject property upon which the sign is located must be owned in fee interest, or must be under lease for a minimum ten (10) year period (from the date of issuance of the sign permit), by, or for the purpose of, the future business or establishment referred to upon the copy of said sign. Proof of compliance with this subsection shall be submitted to the Building Division of the Planning Department prior to issuance of a permit.
.0502 Maximum Area Per Sign Face: Sixty (60) square feet. .0503 Maximum Height: Four (4) feet with a two (2) foot berm, for a maximum total height of six (6) feet.
.0504 Maximum Number Permitted: One (1) single-faced or double-faced freestanding sign per each street or highway frontage.
.0505 Location. All future establishment signs shall be located in the middle thirty (30) percent of the street frontage except for corner lot locations where said sign may be located at the corner.
.0506 Time Limit. For development in conformance with the Theme Park, Parking and Southeast Districts, five (5) years from date of construction or erection, and for development in conformance with District A or the C-R or Pointe Anaheim GardenWalk Overlays, one (1) year from date of construction or erection unless prior to expiration, approved by the Planning Director for an additional period not to exceed one (1) year.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-84
.0507 Names and Dates Required on Signs. The name of the sign owner, property owner or sign builder along with a phone number, as well as the date the sign is erected, shall be securely placed on each sign.
.0508 Sign Permit Fees and Deposits. For each and every on-site future establishment sign, there shall be paid to the Building Division of the Planning Department, a sign permit fee and cash deposit to guarantee removal of each sign. The amount of said fees and deposits shall be as specified by City Council Resolution. Further, all such signs shall be subject to the following conditions:
.01 Return of Deposit. If said sign is removed within thirty (30) days following the expiration date, the removal deposit shall be refunded to the depositor in full. .02 Failure to Remove. If said sign is not removed prior to or upon the permit expiration date, the City or its agents may enter upon subject property and remove the sign, the cost of the removal to be deducted from the removal deposit, and the remainder of the removal deposit, if any, to be returned to the depositor. The person, firm or entity whose name appears on the sign (collectively “person”) shall be notified of the City’s intent to remove the sign not less than fourteen (14) days prior to removal by the City. Following removal by the City, said person shall be notified of the removal and said sign shall be retained for a minimum of ten (10) days following the date of such notice after which said sign may be disposed of by the City.
.03 Authority. Before a permit for such a sign is issued, the owners of record of the premises and the person proposing to erect the sign must furnish the Building Division written authority granting the City of Anaheim or any of its agents or employees irrevocable permission to enter upon the premises and irrevocably appointing the Chief Building Official as the agent of the owners with permission and authority to remove such sign pursuant to the provisions of the section. (Ord. 5689 § 9; July 13, 1999; Ord. 6022 § 26; May 25, 2006.) .060 Business and Identification Signs. Business and identification signs shall comply with the Design Plan, shall consist of permanent non-changeable copy except as provided for in Section 18.114.130.060.0602.01 (Changeable Copy Signs), and shall comply with the following:
.0601 Permitted Signs. The following sign types are allowed in this Zone subject to the requirements of this chapter.
.01 Freestanding Monument Signs. Such signs shall be:
(a) Monument signs except as provided elsewhere in this chapter; (b) Limited to the name of the development and/or a maximum of three (3) company names which may be identified by the company name and/or company symbols/logos or three (3) generic names (e.g., ‘gifts’, ‘restaurant’);
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-85
(c) Such signs shall use the standard Anaheim Resort monument sign design and conform to the appropriate sign size as specified in Exhibit 7.0a (General Sign Standards Matrix) and Exhibit 7.0b (Hotel/Motel Sign Standards Matrix) in paragraph 18.114.130.060.0604 (Sign Standards Matrices) and in accordance with Planning Standard Details Nos. 5 and 6 on file in the Planning Department.
(d) Freestanding monument signs shall be located in the approximate middle forty percent (40%) of the street frontage except on corner lot locations where said sign may be located at the corner.
.02 Informational, Regulatory and Directional (IRD) signs not visible from the Public Right-of-Way. Such signs shall:
(a) Be located outside any required setback area;
(b) Be designed to direct pedestrians and/or vehicular traffic while said traffic is on the parcel on which said signage is located; and
(c) Be designed as a coordinated architectural, informational, directional and regulatory sign system for said project, provided if a company symbol or logo is part of the sign copy, it may occupy up to a maximum of fifty percent (50%) of the sign area.
.03 Informational, Regulatory and Directional (IRD) Signs Visible from the Public Right-of-Way.
(a) Except as set forth in subparagraph (b) below, such signs shall:
(i) Have a maximum sign face of eight (8) square feet; and (ii) Be designed as a coordinated architectural, informational, directional and regulatory sign system for said project, provided if a company symbol or logo is part of the sign copy, it shall occupy a maximum of twenty-five percent (25%) of the sign area, and
(iii) May be located on informational kiosks outside of any required setback area.
(b) During such time as Magic Way is a public street, informational and directional blade signs visible from Magic Way may encroach into the required minimum setback area abutting the Magic Way public right-ofway and may exceed a maximum sign area of eight (8) square feet subject to the approval of the Planning Director provided:
(i) “Blade Sign” shall mean a sign on blade panels affixed to a pole; (ii) Blade signs shall be designed as part of a coordinated architectural, informational and directional sign system;
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-86
(iii) Such signage shall be limited to a maximum pole height of twelve (12) feet and a maximum pole diameter of eight (8) inches. The individual blade panels shall be limited to a maximum length of forty eight (48) inches, and shall be attached to the pole at a height between seven (7) feet and eleven (11) feet above grade level;
(iv) Such signage shall be limited to a maximum of two (2) blade signs at each vehicular entry drive; and
(v) Such signage shall not be oriented toward, or direct vehicular circulation toward, Walnut Street.
.04 Wall Signs.
(a) Wall signs shall not encroach into any public right-of-way, and are subject to the provisions specified in Exhibit 7.0a (General Sign Standards Matrix) and Exhibit 7.0b (Hotel/Motel Sign Standards Matrix) in paragraph

18.114.130.060.0604 (Sign Standard Matrices).
(b) Said signs shall have only one (1) display surface; and (c) Said signs shall be placed parallel to and in front of any exterior wall of the building.
.05 Canopy Signs. Canopy Signs as defined in subsection 18.114.130.010 (Definitions Pertaining to Signs) are considered a wall sign and as such, all regulations pertaining to wall signs also pertain to canopy signs. Such signs shall be permitted on awning valances, provided awnings shall not be permitted to project over or into a public right-of-way and the awnings shall be an integral part of the building design. Canopy signs on awning valances are considered wall signs and are subject to the provisions of wall signs as provided in Exhibit

7.0a (General Sign Standards Matrix) and Exhibit 7.0b (Hotel/Motel Sign Standards Matrix) in paragraph 18.114.130.060.0604 (Sign Standard Matrices) and to the following provisions:
(a) Said signs must be oriented to the pedestrian;
(b) Said signs shall not be internally illuminated;
(c) Only fifteen percent (15%) of the entire surface of the awning may be utilized for the sign;
(d) Said sign may include the company name and/or company symbol/logo; and
(e) Up to one (1) canopy/awning may have “The Anaheim Resort®” logo located on the canopy/awning in a size and location approved by the Planning Director.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-87
.06 Window Identification Signs subject to Exhibit 7.0a (General Sign Standards Matrix) and Exhibit 7.0b (Hotel/Motel Sign Standards Matrix) in paragraph

18.114.130.060.0604 (Sign Standard Matrices).
.07 Restaurant Menu Boards subject to the provisions of Exhibit 7.0a (General Sign Standards Matrix) and Exhibit 7.0b (Hotel/Motel Sign Standards Matrix) in paragraph 18.114.130.060.0604 (Sign Standard Matrices). .08 Other signs as permitted elsewhere in this chapter. .0602 Conditionally Permitted Signs. The following signs shall be permitted subject to the approval of a conditional use permit pursuant to and in accordance with the applicable provisions of Chapters 18.60 ( Procedures) and 18.66 (Conditional Use Permits); this section is not intended to conditionally allow signs prohibited by this chapter or to change the standards contained herein, but is intended to provide a mechanism to address special circumstances.
.01 Changeable copy signs (including electronic message boards) for a theater, entertainment facility, amusement park, or for hotel/motel complexes provided the site on which the use is located is a minimum of six (6) acres in area. In addition, the following provisions shall apply to such signs:
(a) In addition to the permitted business identification wall signs, changeable copy signs shall be wall signs provided the top of such sign is below the cornice of the building or twenty five (25) feet whichever is lower, except that a theater or entertainment facility may have a changeable copy sign which displays identification and program information, the name of the theater or auditorium and it may be a Marquee sign.
(b) Such signs shall not be visible from residential zoned or residentially developed properties;
(c) The design of such signs shall be integrated with the architecture of the building; and
(d) Animation and bare bulbs are allowed as they pertain to bulb matrix technology (the technology used for reader board changeable message signs);
.02 Signs neither otherwise expressly permitted nor otherwise expressly prohibited in this Zone.
.03 Signs for any use, building or structure requiring a conditional use permit. .04 Projecting signs as defined in subsection 18.114.130.010.0143 (Projecting Sign).
.05 In the Anaheim GardenWalk Overlay, up to two (2) icon/themed signage elements (defined as "a structure, sculpture, or having the nature of, an icon, The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-88
which is a nationally-recognized image or object, including, but not limited to, trademarked objects, logos, or other images and figures associated with nationally-recognized corporate identities") shall be permitted subject to the approval of Conditional Use Permit No. 4078, as amended, or a separate conditional use permit provided that the signage shall be associated with a use approved for the Anaheim GardenWalk project pursuant to Section 18.114.105 (Anaheim GardenWalk Overlay); the size, location, height (not to exceed ninety (90) feet in height measured from the elevation of the public sidewalk closest to the location of the element), and design of the signage shall be determined by the conditional use permit, and further provided that the maximum height of the icon/themed project element in the interior of Area A may be permitted up to a height of 75 feet measured from the elevation of the public sidewalk closest to the location of the element (Disney Way) to the top of the element, provided that the element is proposed without any signage, including logos, trademarked objects or other images and figures associated with nationally- recognized corporate identities, excluding signage that is visible to the interior of the project only, and is located a minimum of two hundred (200) feet from the public right-of-way. (Ord. 6221 § 8; August 23, 2011: Ord. 6391 § 1; December 20, 2016.)
.0603 Prohibited Signs. The following types of signs shall be prohibited in this Zone:
.01 A-frame or “sandwich board” signs.
.02 Animated signs.
.03 Attachments or “riders” to signs.
.04 Beacon lights or beacon signs, when the intent of such signs is advertising and not entertainment, which shall not have adverse glare on adjoining properties. .05 Billboards.
.06 Business information sign.
.07 Can-type signs.
.08 Changeable copy signs (including electronic message boards), as defined (except as permitted under a conditional use permit) for theaters, entertainment facilities, amusement parks or for hotel/motel complexes provided the site on which the use is located is a minimum of six (6) acres in area. .09 Emitting signs.
.10 Exposed neon signs.
.11 Flashing or traveling light signs.
.12 Fluorescent colors on signs except for colors on company symbols.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-89
.13 Landscape signs. An arrangement of any plant type (flowers, shrubs, etc.), which spells out words or resembles a symbol or a figure shall not be permitted. .14 Magnetic signs.
.15 Off-premises or off-site directional signs, except as permitted in subparagraph

18.114.130.020.0201.02(c).
.16 On-site directional guidance and on-site directory signs which are not part of a coordinated architectural, informational, directional and regulatory sign system. .17 Paper, cloth and plastic streamer signs, and flags, banners and fixed balloons except as otherwise permitted pursuant to Section 18.44.170 (Temporary Signs - Special Event Permit).
.18 Painted signs on exterior walls, except murals allowed pursuant to Section

18.114.060.020.0204 (Murals).
.19 Pennants except as otherwise permitted pursuant to Section 18.44.170 (Temporary Signs - Special Event Permit).
.20 “Come-on” signs (e.g. “Sale Today”, “Stop,” “Look,” “Going out of Business,” etc.).
.21 Pole signs.
.22 Portable signs.
.23 Product advertising signs (e.g., soft drinks, cigarettes, etc.) .24 Roof signs.
.25 Rotating or revolving signs.
.26 Signs attached to trees or landscaping.
.27 Signs projecting over or into the public right-of-way except as otherwise expressly permitted herein.
.28 Statues utilized for advertising purposes.
.29 Temporary signs except as otherwise expressly permitted herein. .30 Replicas of official traffic control signs or signs so similar as to be confusing or hazardous to traffic.
.31 Vehicle entrance or exit signs which incorporate business name(s) or other advertising not in compliance with subparagraph 18.114.130.060.0601.03 (Information, Regulatory and Directional (IRD) Signs Visible from the Public Right-of-Way).

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-90
.32 Vehicle signs (signs mounted or displayed on a vehicle for advertising purposes) or the parking or storage of advertising vehicles on public or private property.
.33 Wall signs located below the third (3rd) floor level of a building and which signs are located on a property adjacent to and visible from residential properties.
.34 Window signs, including neon signs and signs painted on display windows with day-glo, or temporary paint (other than permitted window identification signs as defined in subparagraph 18.114.130.060.0601.06 (Window Identification Sign).
.0604 Sign Standard Matrices. In addition to all other requirements contained in this chapter, permitted signs shall comply with the provisions of Exhibit 7.0a (General Sign Standards Matrix) and Exhibit 7.0b (Hotel/Motel Sign Standards Matrix) as hereinafter set forth in this chapter and the provisions of which are incorporated herein by this reference. (Ord. 5580 § 32; October 22, 1996: Ord. 5689 § 10; July 13, 1999: Ord. 5768 § 1; May 1, 2001; Ord. 5807 § 5; March 19, 2002; Ord. 6022 § 27; May 25, 2006: Ord. 6031 §§ 62, 63; August 22, 2006.) .070 Automotive Service Station Signs. The following provisions shall apply to all automotive service stations located in this Zone.
.0701 Freestanding Monument Sign. Information on this sign shall include only the company symbol or logo, company name, special services (such as car wash) and pricing information. In addition, the following provisions shall apply to such signs:
.01 If the automobile service station is located on a corner lot, either one of the following shall be permitted: one (1) double-faced freestanding monument sign located at the corner or one (1) double- faced freestanding monument sign per street frontage with each sign located at least seventy-five (75) feet from any intersection.
.02 If the automotive service station is not located upon a corner lot, one (1) doublefaced freestanding monument sign shall be permitted, located in the approximate middle forty percent (40%) of the street frontage of said lot. .03 Such signs shall use the standard Anaheim Resort monument sign design and conform to the appropriate size as specified in Exhibit 7.0a (General Sign Standards Matrix) in paragraph 18.114.130.060.0604 (Sign Standard Matrices) and in accordance with Planning Standard Detail No. 7 on file in the Planning Department.
.04 Pricing signs shall conform to the provisions of Division 5, Chapter 14, Article 12, Code Sections 13530-13540, of the Business and Professions Code of the State of California, or any successor provisions thereto. The height of any pricing numbers shall be a minimum of six (6) inches and a maximum of ten The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-91
(10) inches provided the height is less than the height of the company name and shall be either manually or electronically changeable.
.05 Said signs shall be illuminated internally; however, the permanent background portion shall be opaque, with only the message portion being illuminated. .06 These signs shall be constructed of materials in compliance with the Design Plan.
.0702 Automotive Service Station Wall, Parapet and Canopy Signs. In addition to freestanding Anaheim Resort monument signs, the company symbol or logo and/or company name may be applied to the building wall or parapet and/or pump island canopy. The following additional provisions shall apply to said parapet wall signs:
.01 Said signs shall consist of individually fabricated letters and/or company symbol or logo.
.02 Lighted signs may be internally illuminated only.
.03 All signs shall be attached to the building or pump island canopy face without the use of visible supports or raceways.
.04 Letter height shall be a maximum of eighteen (18) inches. Company symbol or logo height shall be a maximum of twenty-four (24) inches. .05 Said signs shall be limited to one (1) exposure for each direction of traffic flow, up to a maximum of four (4) exposures.
.0703 Pump Top and Pump Face Signs. No signs other than instructional or operational signs (e.g., "Self Service," "Pay Cashier First") shall be permitted on the pump top or pump island canopy, unless they are part of an overall, designed corporate identity program for signage.
.0704 Lighter Box Signs. Lighter box signs, as defined in subsection 18.114.130.010 (Definitions), shall be permitted in service stations; provided that such signs have dimensions not exceeding four (4) feet in height and the span of the working area or thirteen (13) feet, whichever is less, and shall be limited to the company name or company symbol or logo. Lighter box signs shall conform to the provisions of Section 18.114.130 (Sign Regulations). Signs complying with this subsection shall not be considered freestanding monument signs. (Ord. 5920 1 (part); June 8, 2004:

Ord. 6156 § 46; September 22, 2009; Ord. 6506 §§ 59, 60; February 9, 2021.)

18.114.140 APPLICATION FEES.

By resolution, the City Council may establish fees and the amounts thereof required to be paid to the City for design guideline review and for processing Final Site Plans, building permits and any other application for subsequent approvals to carry out the purposes of this chapter to implement or amend Specific Plan No. 92-1. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5580 § 34; October 22, 1996; Ord. 5920 § 1 (part); June 8, 2004.)
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-92

18.114.150 DEVELOPMENT REVIEW AND PERMITS.
.010 Development Review and Permits. Prior to commencing any work pertaining to the erection, construction, reconstruction, moving, conversion, alteration or addition to any building or structure within this zone, all building and site plans shall be subject to review by the Planning and Building Department of the City for conformance with the Specific Plan and the approved Final Site Plan if required by this chapter and permits shall be secured from the Chief Building Official of the City of Anaheim in compliance with all provisions of Section 18.90.110 (Development Review and Permits – General); provided further, that where there are existing buildings and structures on a site for which more intensive development is proposed under the provisions of this Zone, no building permit shall be issued until the Chief Building Official and the Fire Chief have certified that the existing buildings and structures are safe for occupancy and for human habitation. .020 Landscape Plan Review. The location of all proposed on-site and off-site landscaping, including that within the parkway area (the area within the ultimate street right-of-way as described on the Circulation Element of the General Plan as further described in Section

5.0, the Design Plan of the Specific Plan), shall be shown on a final site plan, or building plans if no Final Site Plan is required, drawn to scale, and shall be subject to the review and approval of the Planning and Public Works/Engineering Departments prior to installation. Such plans shall be consistent with the Specific Plan, a required Final Site Plan approved pursuant to subsection 18.114.040.020 (Final Site Plan Approval) and the provisions of the Design Plan. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5580 § 35; October 22, 1996; Ord. 5920 § 1 (part); June 8, 2004.)

18.114.160 DEDICATION AND IMPROVEMENTS.

Dedication of street rights-of-way, public utility easements and other public works and improvements shall be required in connection with any work pertaining to the erection, construction, reconstruction, moving, conversion, alteration or addition to any building or structure within this Zone as otherwise required pursuant to Section 18.40.060 (Dedications and Improvements). (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5920 § 1 (part); June 8, 2004.)

18.114.170 RECLASSIFICATION PROCEDURE – VIOLATION.

Concurrent with or subsequent to introduction of an ordinance adding this chapter to the Anaheim Municipal Code, the City Council may introduce an ordinance to reclassify the property covered by Specific Plan No. 92-1 (SP No. 92-1) and this chapter to the zoning designation SP No. 92-1.

Such reclassification shall be subject to each of those certain conditions of approval of SP No. 92- 1 as set forth in Resolution No. 93R-146 as amended by Resolution No. 96R-177, and, as otherwise amended in accordance with the Specific Plan Amendment Procedures set forth in Chapter 18.72 (Specific Plans). Any violation of any of said conditions shall be deemed a violation of this chapter as well as of the reclassification ordinance and shall be punishable as set forth in Section 1.01.370 of the Anaheim Municipal Code. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5580 § 36; October 22, 1996; Ord. 5920 § 1 (part); June 8, 2004.)
The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-93

18.114.180 PENALTIES FOR VIOLATIONS.

Any violation of the provisions of this chapter shall be subject to penalties as prescribed in Section

18.90.120 (Penalties for Violations). Any condition caused or permitted to exist in violation of any of the provisions of this chapter shall be deemed a public nuisance and may be, by this City, summarily abated as such, and each day such condition continues shall be regarded as a new and separate offense. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5920 § 1 (part); June 8, 2004.)

18.114.190 AMENDMENTS, CONDITIONAL USE PERMITS AND VARIANCES.

Boundaries of the Districts established by this chapter (other than those minor boundary adjustments processed in accordance with subsection 18.114.040.020 (Final Site Plan Approval) and/or subsection 18.114.040.040 (Planning Director Approval of Boundary and Acreage Variations), the classification of property uses therein, or other provisions of this Title may be amended, exceptions made therefrom, or conditional uses permitted in accordance with the facts, conditions, procedures and required showings specified in Chapter 18.60 (Procedures) and Chapter

18.72 (Specific Plans). (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5580 § 37; October 22, 1996; Ord. 5920 § 1 (part); June 8, 2004.)

18.114.200 NONAPPLICABILITY OF CHAPTER TO CITY ACTIVITIES OR PROPERTY.

Notwithstanding any other provision of this chapter to the contrary, no provision of this chapter shall apply to or be a limitation upon the City of Anaheim, whether the City acts in a governmental or proprietary capacity. (Ord. 5378 § 1 (part); June 29, 1993; Ord. 5920 § 1 (part); June 8, 2004.) Exhibit 7.0A
Freestanding Monument Sign
Street Frontage 0-60 ft. >60-150 ft. >150-300 ft. >300 ft.

Maximum Sign Area
Per Sign Face (A) None • See Planning Standard Details Nos. 5, 6, and 7 on file in the Planning Department Maximum Number of
Signs Per Lot None • One (1) per street frontage. (B)
• One (1) per 660 feet of street
frontage. (C)
Minimum Setback
From Public Right-ofWay
Not
Applicable
• Two (2) ft.
• Except adjacent to Harbor Blvd. between Orangewood Ave. and I-5 freeway and adjacent to Katella Ave. between Walnut St. and I-5 freeway where it shall be zero (0) feet.

Maximum Height to
Top (D)
Not
Applicable
• 9 feet oriented on a horizontal format.
• 11.5 feet oriented on a vertical format
Sign Copy Not
Applicable
• Name and/or logo of the development and/or name and/or logo of up to three (3) tenants/accessory uses. (E)
• Total area for sign copy shall not exceed 75% of total sign face and shall not be closer than 10 inches to any edge.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-94
Street Frontage 0-60 ft. >60-150 ft. >150-300 ft. >300 ft.

Illumination Not
Applicable
Illumination Limitations
• No bare bulbs, exposed neon, animated or flashing signs.

Allowable Illumination
• Letter/symbols routed from painted opaque background with internally illuminated push-through copy.
• Ground mounted spotlights screened from public view by landscaping.

Other Limitations Not
Applicable
• All signs to be mounted on the standard Anaheim Resort sign base which is not included in the area calculation of the sign. • Signs shall identify development address in the location specified on sign details on file in the Planning Department.
• All signs except corner locations shall be located in the middle 40% of the street frontage. For corner locations signs shall be set back in accordance with the Design Plan.
• Any attachments or “riders” to signs shall be prohibited. • All signs shall be placed perpendicular to the street. (A) Area of sign face refers to the permitted sign copy area as shown on the Anaheim Resort Sign Standard Details on file in the Planning Department.
(B) For corner lots, one freestanding monument sign is permitted on each street frontage (up to two signs per lot), provided that if two signs are installed, each sign shall be located a minimum distance of seventy-five (75) feet from the intersection and the sign copy of both signs is not legible at the same time from any point on the adjacent rightsof-way. If one sign is installed, it is permitted to be installed at the corner or along either street frontage. (C) Maximum of two (2) signs per street frontage with a minimum distance of 300 ft. between signs. (D) Signs located adjacent to Harbor Boulevard and Walnut Street shall be oriented on a horizontal format, signs on all other streets in the District shall be oriented on a vertical format. (E) Multi-tenant signs shall either use one consistent typeface for all tenants or one color for all sign copy. The capital letter height and logo of all tenant identification copy shall be the same on a single sign face.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-95
Business Identification Wall Sign
Street Frontage 0-30 ft. >30-60 ft. >60-100 ft. >100-150 ft. >150 ft.

Maximum Sign Area Per Sign Face 30 SF 60 SF 100 SF 140 SF 160 SF Maximum Number of Signs Per Lot
Mid-block Locations
• One (1) per building or store front.

Corner Lots
• One (1) per building or store front; or, one (1) per building per each street frontage as long as only one sign is legible at any time from any point on the adjacent public right-of-way.

Sign Copy
Number of Stories Maximum Letter/Symbol Height
(A)
Symbol Only
Maximum Height
1-2 24 in. 36 in.

Over 2 36 in. 48 in.
• Sign copy limited to building name and/or logo, individual business name and/or logo, or generic name (i.e. Pizza, Gift Shop) and/or logo.
• Sign copy shall be located no closer than one-half the size of the largest letter/symbol to the top and sides of the building wall.
• Sign copy shall be located at the cornice line or 25 feet from the ground, whichever is lower.

Illumination
Illumination Limitations
• No bare bulbs, exposed neon, animated or flashing signs. • No internally illuminated canopies/awnings.
• No white or light colored translucent back lit panels. • Signs shall be attached without visible supports or raceways. • No dual-lit signs.

Allowable Illumination
• Sign cabinet with letters/symbol routed from opaque background with internally illuminated copy.
• Reverse metal pan channel letters/symbol with neon halo illumination. • Internally illuminated channel letters/symbol with translucent face panels. • Open pan channel letters/symbol with neon illumination and clear translucent face panels.

Other
Limitations
• 12-inch maximum projection from building face; however, individual letters attached at the base of an architectural feature, such as a metal canopy or architectural projection, are permitted to extend beyond twelve (12) inches from the building wall, provided the architectural element is a substantial component of the elevation and the individual letters do not project beyond the edge of the architectural feature. • Projection over the public right-of-way is prohibited. • There must be a minimum distance of 16 feet between signs on the same parcel. • Canopy and awning sign design must be an integral part of the building design and are in lieu of permitted wall signs.
(A) When the symbol is used in conjunction with a company name or logo.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-96
Window Identification Sign
Maximum Sign Area
Per Sign Face
• 10% of the area of the largest glass windowpane or four (4) square feet, whichever is less, positioned so that views into the premises are not obstructed.

Maximum Number of
Signs Per Lot • Same as wall signage.

Sign Copy Limitations • Limited to the business name and/or logo.

Other Limitations
• Painted, screen-printed or leafed letters/symbol on to interior surface of glass.

Signs applied to the exterior of window surfaces are prohibited. • Use only one sign per glass window panel, two maximum per business. • Neon signs and plaques or signs suspended behind the glass are not allowed.

Projecting Sign
Maximum Sign Area Per Sign
Face • 4 SF
Maximum Number of Signs Per
Lot • One (1) per business or store front.

Sign Copy Limitations • Limited to the business name and/or logo.

Other Limitations
• Lowest point of sign shall be 8 feet above ground level directly below sign.
• Maximum height to be determined by Conditional Use Permit. • 16-foot minimum distance between signs on the same parcel. • 30-inch maximum projection from building face.
• Externally illuminated signs only.
• Conditional Use Permit required.

On-Site Directional Informational and Guidance Signs
Maximum Sign
Area Per Sign
Face
• 8 SF when visible from the public right-of-way.

Sign Copy
Limitations
• Limited to the directional symbol or directional copy and may include the business name and/or logo.

Maximum
Height • As required by local, state or national code.

Illumination • Sign cabinets with letters/symbols routed from opaque background with internally illuminated copy.

Other
Limitations
• No more than two (2) directional (entrance/exit) signs per driveway. • Company symbol shall not occupy more than 50% of sign area. • Must be designed as part of a coordinated architectural, informational, regulatory and directional sign program for the project and may be designed per Planning Standard Detail No. 8.
• On-site directional (entrance/exit) signs located within the setback area adjacent to a public street shall comply with the minimum setback requirements for monument signs and shall comply with vehicular line-of-site requirements; all other on-site directional, informational or regulatory signs visible from the public right-of-way shall not be located within the setback area adjacent to a public street.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-97
Restaurant Menu Board
Maximum Sign Area Per Face • 4 SF
Maximum Number of Signs Per
Lot • One (1) per main entrance to restaurant.

Sign Copy Limitations • Limited to display of restaurant menu only.

Illumination • May be internally illuminated.

Other Limitations
• Shall be permanently affixed to building wall adjacent to main entrance.
• Maximum 3-inch projection from building face.

Open and Closed Signs
Maximum Sign Area Per Face • 2 SF
Maximum Number of Signs Per
Lot • One (1) per main entrance.

Sign Copy Limitations • Message limited to ‘open’ and/or ‘closed’ only.

Illumination
• May be internally illuminated or exposed neon.
• No bare bulbs or flashing signs.
• No can signs with translucent back-lit panels.

Other Limitations • Placed inside the building adjacent to the main entrance. • Sign shall not include company name and/or logo.

18.114.130.060.0604 (EXHIBIT 7.0B) – MOTEL/HOTEL SIGN STANDARDS MATRIX Freestanding Monument Sign
Street Frontage 0-60 ft. >60-150 ft. >150-300 ft. >300 ft.

Maximum Sign
Area Per Sign
Face (A)
None • See Planning Standard Details Nos. 5, 6 and 7 on file in the Planning Department
Maximum
Number of
Signs Per Lot
None • One (1) per street frontage
(B) • One (1) per 660 feet of street frontage (C)
Minimum
Setback From
Public Rightof-Way
Not
Applicable
• • Two (2) ft.
• Except adjacent to Harbor Blvd. between Orangewood Ave. and I-5 freeway and adjacent to Katella Ave. between Walnut St. and I-5 freeway where it shall be zero (0) feet.

Maximum
Height to
Top (D)
Not
Applicable
• • 9 feet oriented on a horizontal format.
• 11.5 feet oriented on a vertical format
Sign Copy Not
Applicable
• Name and/or logo of the development and/or name and/or logo of up to three (3) tenants/accessory uses. (E)
• Total area for sign copy shall not exceed 75% of total sign face and shall not be closer than 10 inches to any edge.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-98
Street Frontage 0-60 ft. >60-150 ft. >150-300 ft. >300 ft.

Illumination Not
Applicable
Illumination Limitations
• No bare bulbs, exposed neon, animated or flashing signs.

Allowable Illumination
• Letter/symbols routed from painted opaque background with internally illuminated push-through copy.
• Ground mounted spotlights screened from public view by landscaping.

Other
Limitations (F)
Not
Applicable
• All signs to be mounted on the standard Anaheim Resort sign base which is not included in the area calculation of the sign.
• Signs shall identify development address in the location specified on sign details on file in the Planning Department.
• All signs except corner locations shall be located in the middle 40% of the street frontage. For corner locations signs may be located at the corner. • Any attachments or “riders” to signs shall be prohibited. • All signs shall be placed perpendicular to the street. • Affiliation and vacancy information signs shall be in the location designated on the standard base diagram.
(A) Area of sign face refers to the permitted sign copy area as shown on the Anaheim Resort Sign Standard Details on file in the Planning Department.
(B) For corner lots, one freestanding monument sign is permitted on each street frontage (up to two signs per lot) provided that if two signs are installed, each sign shall be located a minimum distance of seventy-five (75) feet from the street intersection and the sign copy of both signs is not legible at the same time from any point on the adjacent public right-of-way. If one sign is installed, it is permitted to be installed at the corner or along either street frontage. (C) Maximum of two (2) signs per street frontage with a minimum distance of 300 ft. between signs. (D) Signs located adjacent to Harbor Boulevard and Walnut Street shall be oriented on a horizontal format, signs on all other streets in the District shall be oriented on a vertical format. (E) Multi-tenant signs shall either use one consistent typeface for all tenants or one color for all sign copy. The capital letter height and logo of all tenant identification copy shall be the same on a single sign face. If a retail business within the Hotel/Motel is identified on the sign, the sign shall be considered a multi-tenant sign. (F) A special district has been created on Disneyland Drive between Katella Avenue and Ball Road. Hotels/Motels developed in this district may integrate the allowable sign area specified for freestanding monument signs into a feature landscape element, such as a wall or other landscape feature that expresses the architecture or thematic character of the development or establishment. The finish, color and materials of the monument sign shall conform of the design aesthetic of a hotel, in terms of finish, color and materials, and shall not exceed the height and width requirements of the Street Frontage: >150 feet category found in Planning Standard Detail No. 6 on file in the Anaheim Planning Department. This sign area shall be defined according to Code Section 18.114.130.010.0102 “Area of Sign” in the Sign Code. Sign copy shall not occupy more than 75% of the total sign area and shall not be located within 10 inches of the perimeter of the sign face. This feature landscape element shall be used for identity signage in lieu of the standard monument sign base and can include the street address, professional affiliations, and vacancy information. These feature landscape elements are to frame the entry drive of each major hotel and can occur on one or both sides of the main driveway entrance to the hotel. The landscape element can extend into the required landscape setback, with the provision that: (a) a minimum 7-ft. setback from the public right-of-way be maintained; (b) that the landscape element does not violate the City’s vehicle sight distance standards; and, (c) that it does not create a continuous wall along the Disneyland Drive frontage. The maximum height of the landscape element within the required landscape shall not exceed 10 ft. and there shall not be more than two sign faces per hotel entry drive, consistent with the Design Plan sign standards. A minimum 2-foot wide border shall be planted with plants and shrubs, irrigated and permanently maintained around the sign base. A minimum of 50% of the plants within the landscape border area shall be selected from the groundcover or shrub category of the planting matrix found in Standard Detail No. 10. The type of sign illumination permitted shall be the same as those permitted under FREESTANDING MONUMENT SIGN listed above. All letters and symbols shall be routed out and have an acrylic backer so that the letters are flush with the sign face.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-99
Hotel/Motel Business Identification Wall Sign
Number of Stories 1-2 3-4 5-9 10-14 Over 15
Maximum Sign Area
per Sign Face 160 SF 200 SF 250 SF 300 SF 350 SF
Maximum
Letter/Symbol Height
(A)
2 ft. 4 ft. 4 ft. 6 in. 5 ft. 6 in. 10 ft.

Symbol Maximum
Height 3 ft. 7 ft. 8 ft. 10 ft. 10 ft.

Maximum Number of
Signs per Lot
• Two (2) per building.
• Located on non-adjacent building elevations; provided that for buildings on corner lots or for buildings over five (5) stories in height, the two wall signs may be located on adjacent building elevations as long as only one sign is legible at any time from any point on the adjacent public right-of-way.
• Buildings over five (5) stories may have one additional wall sign located on the porte-cochere with a maximum letter/symbol height of eighteen (18) inches.

Sign Copy
• • Sign copy limited to hotel/motel name and/or logo.
• Sign copy shall be located no closer than one-half the size of the largest letter/symbol to the top and sides of the building wall or fascia or to the closest window line adjacent to the sign.
• Sign copy shall be located below the top of the building eave line or roof line, whichever is lower.

Illumination
Illumination Limitations
• No bare bulbs, exposed neon, animated or flashing signs. • No internally illuminated can signs displaying corporate hotel/motel affiliations. • No internally illuminated canopies/awnings.
• No white or light colored translucent back lit panels. • Signs shall be attached without visible supports or raceways.

Allowable Illumination
• For symbols only, sign cabinet with letters/symbol routed from opaque background with internally illuminated copy.
• Reverse metal pan channel letters/symbol with neon halo illumination. • Internally illuminated channel letters/symbol with translucent face panels. • Open pan channel letters/symbol with neon illumination.

Other Limitations (B)
• 12-inch maximum projection from building face.
• Projection over the public right-of-way is prohibited. • Signs shall be attached without visible supports or raceways. • Canopy and awning sign design must be an integral part of the building design and are in lieu of permitted wall signs.
(A) When the symbol is used in conjunction with a company name or logo. (B) A special district has been created on Disneyland Drive between Katella Avenue and Ball Road. Hotels/Motels developed in this district may integrate the allowable sign area specified for business identification wall sign into the ‘Over 15’ Number of Stories category. For the purposes of measurement, the Maximum Letter/Symbol Height and Symbol Maximum Height are additive. Sign letters may be side lit and symbols may project light.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-100
Hotel/Motel Accessory Business Wall Sign
Maximum Sign
Area Per Face • • 30 SF
Maximum Number
of Signs Per Lot • • One (1) sign that is visible from the public right-of-way per business or store front.

Sign Copy
Limitations
• • Limited to the business name and/or logo.
• Shall be located below the second floor line.
• Maximum Letter Height: 24 in. per letter.
• Maximum Symbol Height (when used with a company name or logo): 24 in. • Symbol Only Maximum Height: 24 in.

Other Limitations
• No flashing signs, exposed neon or bare bulbs.
• Signs shall be attached without visible supports or raceways. • Signs shall be installed directly above or adjacent to the main entrance of the business. • Limited to restaurant or retail shops having a separate entrance other than through hotel/motel lobby.
• Accessory business wall signs not visible from the public right-of-way are exempt, provided they are part of a coordinated sign program.

Window Identification Sign
Maximum Sign Area
Per Face
• 10% of the area of the largest glass windowpane or four (4) square feet, whichever is less, positioned so that views into the premises are not obstructed.

Maximum Number of
Signs Per Lot • • Same as wall signage.

Sign Copy Limitations • Limited to the business name and/or logo.

Other Limitations • Painted, screen-printed or leafed letters/symbol on to interior surface of glass.

Signs applied to the exterior of window surfaces are prohibited. • Use only one sign per glass window panel, two maximum per business. • Neon signs and plaques or signs suspended behind the glass are not allowed.

Projecting Sign
Maximum Sign Area Per Face • • 4 SF
Maximum Number of Signs
Per Lot • • One (1) per business or store front.

Sign Copy Limitations • • Limited to the business name and/or logo.

Other Limitations
• Lowest point of sign shall be 8 feet above ground level directly below sign. • Maximum height to be determined by Conditional Use Permit. • 16-foot minimum distance between signs on the same parcel. • 30-inch maximum projection from building face.
• Externally illuminated signs only.
• Conditional Use Permit required.

The Disneyland Resort Specific Plan 7.0 Zoning and Dev. Standards DRAFT FOR PUBLIC REVIEW (SEPT 2023)
7-101
On-Site Directional Informational and Guidance Signs
Maximum
Sign Area
Per Face
• • 8 SF when visible from the public right-of-way.

Sign Copy
Limitations
• • Limited to the directional symbol or directional copy and may include the business name and/or logo.

Maximum
Height • • As required by local, state or national code.

Illumination • Sign cabinets with letters/symbols routed from opaque background with internally illuminated copy.

Other
Limitations
• No more than two (2) directional (entrance/exit) signs per driveway. • Company symbol shall not occupy more than 50% of sign area. • Must be designed as part of a coordinated architectural, informational, regulatory and directional sign program for the project and may be designed per Planning Standard Detail No. 8.
• On-site directional (entrance/exit) signs located within the setback area adjacent to a public street shall comply with the minimum setback requirements for monument signs and shall comply with vehicular line-of-site requirements; all other on-site directional, informational or regulatory signs visible from the public right-of-way shall not be located within the setback area adjacent to a public street.

Restaurant Menu Board
Maximum Sign Area Per Face • • 4 SF
Maximum Number of Signs Per
Lot • • One (1) per main entrance to restaurant.

Sign Copy Limitations • Limited to display of restaurant menu only.

Illumination • May be internally illuminated.

Other Limitations
• Shall be permanently affixed to building wall adjacent to main entrance. • Maximum 3-inch projection from building face.

Open and Closed Signs
Maximum Sign Area Per Face • • 2 SF
Maximum Number of Signs Per
Lot • • One (1) per main entrance.

Sign Copy Limitations • Message limited to ‘open’ and/or ‘closed’ only.

Illumination
• May be internally illuminated or exposed neon.
• No bare bulbs or flashing signs.
• No can signs with translucent back-lit panels.

Other Limitations • Placed inside the building adjacent to the main entrance. • Sign shall not include company name and/or logo.

The Disneyland Resort Specific Plan 8.0 Legal Description DRAFT FOR PUBLIC REVIEW (SEPT 2023)
8-1
Section 8.0: Legal Description
All that certain real property, in the City of
Anaheim, County of Orange, State of California,
more particularly described as follows: Beginning
at the intersection of the northerly line of Katella
Avenue, 120 feet wide, with the westerly line of
Harbor Boulevard, 120 feet wide; thence North 89°
11’ 53” West 2583.25 feet along said northerly line
to the centerline of West Street, 90 feet wide;
thence continuing North 89° 41’ 05” West 1255.79
feet along said northerly line to the beginning of
that certain property line curve return concave
northerly and having a radius of 17.00 feet, as
shown on Tract No. 2854, in said City, as per map
recorded in Book 90 Pages 39 through 40 of
Miscellaneous Maps of said County; thence
westerly 7.32 feet along said curve through a
central angle of 24° 40’ 57” to the easterly line of
Walnut Street, 90 feet wide; thence on a
nontangent line North 00° 40’ 55” East 1265.11
feet along said easterly line to the southerly line of
Lot 3, Block 14 of Fairview Colony Tract, in said
City, as per map recorded in Book 1 Page 33 of
Miscellaneous Maps of said County; thence North
89° 30’ 26” West 4.00 feet along said southerly
line to the beginning of a non-tangent curve,
concave westerly, having a radius of 698.77 feet
and to which beginning a radial line bears South
89° 19’ 05” East, said curve being the easterly line
of that certain document recorded in Book 7700

Page 764 ends

thence northerly 87.73 feet along said curve
through a central angle of 07° 11’ 36” to the
beginning of a reverse curve, concave easterly
and having a radius of 698.77 feet; thence
northerly 87.73 feet along said curve through a
central angle of 07° 11’ 36” to a point of tangency
with the easterly line of said Walnut Street, 90 feet
wide; thence North 00°, 40’ 55” East 1091.16 feet
along said line to the beginning of a curve concave
easterly and having a radius of 25.00 feet and
tangent at its easterly terminus with the southerly
line of Cerritos Avenue, 97 feet wide; thence North
08° 58’ 30” West 149.11 feet to the intersection of
the northerly line of that certain document
recorded in Book 8735 Page 780 of Official
Records of said County, with the easterly line of
Walnut Street, 60 feet wide, as shown on Tract
No. 7948, in said City, as per map recorded in
Book 260 Pages 42 and 43 of Miscellaneous
Maps of said County; thence North 00° 40’ 23”
East 1305.73 feet along said easterly line to the
northerly line of the north half of the west half of
the Southeast Quarter of the Northeast Quarter of
Section 21, Township 4 South, Range 10 West, in
the Rancho San Juan Cajon de Santa Ana, in said
City, as per map recorded in Book 51 Page 10 of
Miscellaneous Maps of said County; thence South
89° 45’ 45” East 37.00 feet along said line to the
easterly line of Walnut Street, 87 feet wide, as
shown on a Parcel Map, in said City, as per map
recorded in Book 10 Page 44 of Parcel Maps;
thence North 00° 40’ 23” East 662.71 feet along
said easterly line to the southerly line of said
Parcel Map; thence South 89° 39’ 58” East 603.76
feet along said southerly line to the southeast
corner thereof; thence North 00° 40’ 05” East
608.70 feet along the easterly line of said Parcel
Map to the southerly line of Ball Road, 106 feet
wide; thence South 89° 34’ 11” East 405.70 feet
along said southerly line to the westerly line of a
Parcel Map, in said City, as per map recorded in
Book 29 Page 14 of Parcel Maps of said County;
thence South 00° 39’ 47” West 210.03 feet along
said westerly line to the southwest corner thereof;
thence South 89° 34’ 11” East 195.00 feet along
the southerly line of said Parcel Map to the
westerly line of West Street, 100 feet wide, as
shown on said Parcel Map; thence South 00° 39’
47” West 66.87 feet along said westerly line to the
westerly prolongation of the northerly line of the
south half of the Northwest Quarter of Section 22
of said Rancho San Juan Cajon de Santa Ana;
thence South 89° 10’ 01” East 560.54 feet along
said prolongation and northerly line to the easterly
line of Parcel 1 of a Parcel Map, in said City, as
per map recorded in Book 78 Page 42 of Parcel
Maps of said County; thence North 00° 38’ 42”
East 277.25 feet along said easterly line to the
southerly line of said Ball Road; thence South 89°
09’ 30” East 317.12 feet along said southerly line
to the beginning of a nontangent curve, concave
southwesterly, having a radius of 40.55 feet and
The Disneyland Resort Specific Plan 8.0 Legal Description DRAFT FOR PUBLIC REVIEW (SEPT 2023)
8-2
to which beginning a radial line bears North 23°
01’ 08” East, said beginning being the most
westerly corner of that certain Irrevocable Offer of
Dedication recorded December 22, 1988 as
Instrument No. 88-668535 of said County; thence
southeasterly 4.37 feet along said curve through a
central angle of 06° 10’ 49” to the beginning of a
reverse curve, concave northerly and having a
radius of 59.45 feet; thence easterly 29.42 feet
along said curve through a central angle of 28° 21’
27”; thence South 89° 09’ 30” East 195.71 feet to
the southerly line of Ball Road, variable in width,
as shown on a Parcel Map, in said City, as per
map recorded in Book 40 Page 9 of Parcel Maps;
thence South 75° 59’ 03” East 21.91 feet along
said southerly line to the beginning of a curve
concave northerly and having a radius of 330.00
feet; thence easterly 151.52 feet along said curve
through a central angle of 26° 18’ 29”; thence
North 77° 42’ 28” East 48.61 feet to the southerly
line of that certain Document recorded February
21, 1990 as Instrument No. 90-090852 of Official
Records of said County; thence South 89° 09’ 30”
East 500.26 feet along said southerly line to the
southwesterly line of the Southern Pacific Railway
Company Right of Way; thence South 39° 56’ 21”
East 284.22 feet along said southwesterly line to
the most westerly corner of the land described in
the Deed to the State of California recorded April
6, 1960 in Book 5179 Page 272 of Official Records
of said County; thence South 36° 41’ 26” East
391.36 feet along said westerly line to the
beginning of a curve concave westerly and having
a radius of 370.00 feet and tangent at its southerly
terminus with that certain course, recited as North
00° 16’ 25” West, in the Deed to the state of
California filed December 1, 1954, as Instrument
No. 30189 in the office of the Registrar of Titles of
said County; thence southerly 241.06 feet along
said curve through a central angle of 37° 19’ 43”;
thence South 00° 38’ 17” West 265.88 feet along
said tangent line to the beginning of a curve
concave northeasterly and having a radius of
350.00 feet, said curve being the northwesterly
continuation of that certain curved southwesterly
line, recited as having a radius of 350.00 feet, in
the Deed to the State of California recorded
August 11, 1954 in Book 2789 Page 450 of Official
Records of said County; thence southeasterly
349.76 feet along said continuation and recited
curved southwesterly line, through a central angle
of 57° 15’ 25”; thence continuing South 56° 37’ 08”
East 39.04 feet along said southwesterly line to
the beginning of a curve concave southwesterly
and having a radius of 275.00 feet, said beginning
being the most northerly corner of the land as
described in Document recorded June 20, 1955 in
Book 3109 Page 539 of Official Records of said
County; thence southeasterly 274.81 feet along
said curved westerly line, through a central angle
of 57° 15’ 25” to a line parallel with and distant
westerly 60.00 feet, measured at right angles,
from the centerline of Harbor Boulevard as shown
on Record of Survey filed in Book 78 Pages 31
and 32 of Record of Surveys of said County;
thence along said parallel line south 00° 38’ 17”
west, .033 south 89° 11’ 21” east 7.00 feet to a line
parallel with and distant westerly 53.00 feet from
the centerline of said Harbor Boulevard; thence
South 00° 38’ 17” West 1106.79 feet along said
line to an angle point therein; thence continuing
South 00° 39’ 57” West 1144.72 feet to the
westerly prolongation of the northerly line of the
southerly 175.00 feet of the Southwest Quarter of
the Northwest Quarter of the Southeast Quarter of
Section 22, Township 4 South, Range 10 West, in
said Rancho San Juan Cajon de Santa Ana;
thence South 89° 09’ 46” East 713.78 feet along
said prolongation and northerly line to the westerly
line of Lot 20, Tract No. 190, in said City, as per
map recorded in Book 23 Page 50 of
Miscellaneous Maps of said County; thence North
00° 40’ 07” East 505.52 feet along said westerly
line to the northwesterly corner thereof; thence
South 89° 09’ 33” East 1225.80 feet along the
northerly line of said lot to the northwesterly
prolongation of the northeasterly line of Parcel 1
of a Parcel Map. in said City. as per map recorded
in Book 122 Pages 11 and 12 of Parcel Maps;
thence South 39° 57’ 30” East 278.71 feet along
said prolongation and northeasterly line to the
beginning of a curve concave southwesterly and
having a radius of 455.00 feet; thence
southeasterly 25.80 feet along said curve through
The Disneyland Resort Specific Plan 8.0 Legal Description DRAFT FOR PUBLIC REVIEW (SEPT 2023)
8-3
a central angle of 03° 14’ 57” to the westerly line
of the land described in the Deed to the State of
California, recorded in Book 13216 Page 132 of
Official Records of said County; thence on a nontangent line South 25° 14’ 14” East 76.12 feet to the northwesterly corner of the land described in
Deed to the State of California recorded January

11. 1982 as Instrument No. 82- 009830 of said
County; thence South 14° 24’ 29” East 123.00
feet; thence South 01° 29’ 09” West 127.53 feet
an angle point in the westerly line of the land
described in the Deed to the State of California
recorded March 11, 1982 as Instrument No. 82-
085437, of Officials Records of said County;
thence South 20° 45’ 10” West 114.61 feet; thence
South 25° 28’ 23” West 29.84 feet to the southerly
line of said Lot 20; thence North 89° 09’ 46” West
528.16 feet along said line to the northerly
prolongation of the most westerly line of
Clementine Street as per document recorded in
Book 13525 Page 1615 of Official Records of said
County; thence South 00° 39’ 11” West 211.22
feet along said prolongation and westerly line to
the beginning of a curve concave easterly and
having a radius of 501.23 feet; thence continuing
along said westerly line, southerly 50.08 feet along
said curve through a central angle of 05° 43’ 30”
to the beginning of a reverse curve, concave
westerly and having a radius of 501.23 feet;
thence continuing along said westerly line
southerly 50.08 feet along said curve through a
central angle of 05° 43’ 30”; thence continuing
along said westerly line South 00° 39’ 11” West
335.40 feet to the northerly line of Tract No. 3330.
in said City, as per map recorded in Book 113
Pages 21 and 22 of Miscellaneous Maps of said
County; thence South 89° 11’ 46” East 2.00 feet
along said northerly line to the westerly line of
Clementine Street, 60 feet wide, as shown on map
of said Tract; thence South 00° 41’ 15” West
735.30 feet along said westerly line and its
southerly prolongation to the southerly line of
Katella Avenue, 120 feet wide, thence easterly
along said line to a line parallel with the east line
of the Northeast Quarter of Section 27 of said
Rancho San Juan Cajon de Santa Ana, and which
passes through a point on the north line of said
Section, distant thereon westerly 620.00 feet from
the Northeast Corner of said Northeast Quarter;
thence southerly 205.05 feet along said parallel
line to a line parallel with and distant southerly
205.00 feet, measured at right angles, from the
North line of said Section; thence easterly 575 feet
along said parallel line to the westerly line of
Haster Avenue, 90 feet wide as shown; thence
southerly 387.16 feet along said westerly line to
the south line of the north half of the north half of
said Northeast Quarter; thence westerly along
said south line to the east line of the west half of
the east half of said Northeast Quarter; thence
southerly along said east line to the south line of
the north half of the south half of said Northeast
Quarter; thence westerly along said south line to
a line parallel with and distant easterly 400.00 feet,
measured at right angles, from the easterly line of
Harbor Boulevard 120 feet wide; thence northerly
390.36 feet along said parallel line to a line parallel with and distant southerly 205.00 feet, measured
at right angles, from the southerly line of said
Katella Avenue; thence easterly along said
parallel line to a line parallel with and distant
easterly 890.00 feet, measured at right angles,
from the centerline of said Harbor Boulevard;
thence northerly 325.00 feet along said parallel
line to the northerly line of said Katella Avenue;
thence westerly along said northerly line to the
easterly line of the land described in Deed to
Alwyn S. Jewell and Lucille G. Jewell recorded
October 5, 1959 in Book 4912 Page 102 of Official
Records of said County; thence North 00° 37’ 57”
East 615.00 feet along said easterly line to a line
parallel with and distant 675.00 feet northerly,
measured at right angles, from the centerline of
said Katella Avenue; thence North 89° 11’ 49”
West 893.51 feet along said parallel line to the
westerly line of said Harbor Boulevard; thence
South 00° 39’ 57” West 615.00 feet along said
westerly line to the Point of Beginning.

EXCEPTING THEREFROM the following
described land: The easterly 500.00 feet of Lot 1
in Block 15 of the Fairview Colony Tract, in the City
of Anaheim. County of Orange, State of California,
as shown on a map Recorded in Book 1, Page 33
The Disneyland Resort Specific Plan 8.0 Legal Description DRAFT FOR PUBLIC REVIEW (SEPT 2023)
8-4
of Miscellaneous Maps, records of Orange
County, California.

EXCEPTING THEREFROM that portion of said
land included within the lines of Tract No. 2854, as
shown on a map Recorded in Book 90, Pages 39
and 40 of Miscellaneous Maps, records of Orange
County; California.

EXCEPTING THEREFROM the following
described land: The North 435.00 feet of the West
455.00 feet of the East 460.00 feet of Lot 1 in Tract
2854, in the City of Anaheim, County of Orange,
State of California, as per Map recorded in Book
90, Pages 39 and 40 of Miscellaneous Maps, in
the office of the County Recorder of said County.

The Disneyland Resort Specific Plan Appendix A
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
A-1
Appendix A: List of Specific Plan Amendments, Adjustments and Associated Actions
The following is a consolidated list of past Disneyland Resort Specific Plan (DRSP) amendments, adjustments, and associated actions since the original DRSP adoption in 1993.

DRSP Amendment No. 1. On April 12, 1994, the City Council approved Amendment No. 1 in connection with an amendment to the Land Use Element of the City’s General Plan. Amendment No. 1 established “District A”, redesignated a portion of the East Parking Area (approximately 9 acres) to District A, and established Zoning and Development Standards for District A. Amendment No. 1 and the General Plan Amendment were approved by Resolution No. 94R-40 and 94R-41 adopted on March 22, 1994 and by Ordinance No. 5420 adopted on April 12, 1994. Prior to approving Amendment No. 1, the City Council, by motion, on March 22, 1994, determined that previously certified FEIR No. 311 was adequate to serve as the required environmental documentation for this request and modified Mitigation Monitoring Program No. 0067 to reference “District A” in Mitigation Measure 3.10.1-8.

DRSP Amendment No. 2. On June 20, 1995, the City Council approved Amendment No. 2 to redesignate a portion (approximately 10 acres) of the East Parking Area to District A and revisions to the text and exhibits of the DRSP for the associated redesignation, by Resolution No. 95R-95 adopted on June 13, 1995 and by Ordinance No. 5503 adopted on June 20, 1995. Prior to approving Amendment No. 2, the City Council, by motion, on June 13, 1995, determined that previously certified FEIR No. 311 was adequate to serve as the required environmental documentation for this request
DRSP Amendment No. 3. On October 22, 1996, the City Council approved Amendment No. 3, in connection with an amendment to the Anaheim Resort Public Realm Landscape Program and Development Agreement No. 96-01. Amendment No. included modifications to The Disneyland Resort Project including a Revised Phasing Plan, modifications to the Specific Plan (including the Zoning and Development Standards, Design Plan and Guidelines and Public Facilities Plan) to implement the Revised Phasing Plan; and incorporation of text and graphic modifications to the document. Amendment No. 3 and its associated actions were approved by Resolution Nos. 96R177, 96R-178, 96R-179, adopted on October 8, 1996, and by Ordinance Nos. 5580 and 5581, adopted on October 22, 1996. Prior to approving Amendment No. 3, the City Council adopted Resolution 96R-176 on October 8, 1996, finding that the Addendum (dated July 31, 1996) to the DRSP FEIR No. 311 and Modified Mitigation Monitoring Program No. 0067 were adequate to serve as the required environmental documentation for this request.

DRSP Adjustment No. 1. On September 16, 1997, the City Council approved Adjustment No. 1 to include standards addressing permitted encroachments, screening requirements and height limitations by Ordinance No. 5613. The City Council found that this amendment was categorically exempt from CEQA under CEQA Guidelines Section 15061(b)(3), which provides that where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

The Disneyland Resort Specific Plan Appendix A
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
A-2
DRSP Amendment No. 4. On July 13, 1999, the City Council approved Amendment No. 4 pertaining to the Pointe Anaheim Lifestyle Retail and Entertainment Complex, in connection with amendments to the Land Use Element of the City’s General Plan and the Anaheim Resort Public Realm Landscape Program, Conditional Use Permit No. 4078, and Development Agreement No. 99-01. Amendment No. 4 established Zoning and Development Standards for the Pointe Anaheim Overlay, modified the DRSP Land Use Plan, Public Facilities Plan, Design Plan and Conditions of Approval and incorporated text and graphic modifications to implement the Pointe Anaheim Project on 29.1 acres within the DRSP area. Amendment No. 4 added the Point Anaheim Overlay to a portion of District A (18.9 acres) and the Parking District (East Parking Area)/C-R Overlay (10.2 acres). Amendment No. 4 and its associated actions were approved by Resolution Nos. 99R-134, 99R-135, 99R-136 and 99R-137 adopted on June 22, 1999 and July 13, 1999; and, Ordinance Nos. 5689 and 5690 adopted on July 13, 1999. Prior to approving Amendment No. 4, the City Council adopted Resolution No. 99R-133 on June 22, 1999, finding that a Mitigated Negative Declaration and Mitigation Monitoring Plan No. 004 were adequate to serve as the required environmental documentation for this request.

DRSP Adjustment No. 2. [This number was not used.]
DRSP Adjustment No. 3. On September 19, 2000, the City Council approved Adjustment No. 3, which modified permitted accessory uses within the Parking District and permitted encroachments in the Theme Park District by Ordinance No. 5736. The City Council found that this amendment was categorically exempt from CEQA under CEQA Guidelines Section 15061(b)(3), which provides that where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

DRSP Adjustment No. 4. On May 1, 2001, the City Council approved Adjustment No. 4, which modified criteria for Informational, Regulatory and Directional (IRD) Signs visible from the Public Rights-of-Way by Ordinance No. 5768. The City Council found that this amendment was categorically exempt from CEQA under CEQA Guidelines Section 15061(b)(3), which provides that where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

DRSP Amendment No. 5. On March 19, 2002, the City Council approved Amendment No. 5 pertaining to the Pointe Anaheim Lifestyle Retail and Entertainment Complex, in connection with amendments to the Land Use Element of the City’s General Plan, the Anaheim Resort Public Realm Landscape Program and Conditional Use Permit No. 4078, and the First Amended and Restated Development Agreement No. 99-01. Amendment No. 5 included text and exhibit modifications throughout the DRSP relating to the mix and allocation of land uses, zoning standards, phasing, project layout and minor modifications to project conditions of approval and mitigation measures to provide for the development of 634,700 gross square feet of specialty retail, restaurants, and entertainment, including a 94,000 square foot aquarium; 1,662 hotel rooms/suites (including up to 200 vacation ownership units) and 322,071 square feet of hotel accessory uses of which up to 178,120 gross square feet on top of the parking structure may be used for a hotel conference center; and 1,949,800 gross square foot parking structure with up to 4,800 parking spaces and 15 bus spaces at ultimate build out of the project with a 10,200 square foot bus terminal/facility. Amendment No. 5 and its associated actions were approved by Resolution Nos. 2002R-54, 2002R-55, 2002R-56, 2002R-57 and 2002R-58 adopted on February 26, 2002; and, by The Disneyland Resort Specific Plan Appendix A
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
A-3
Ordinance Nos. 5807 and 5808, adopted on March 19, 2002. Prior to approving Amendment No. 5, the City Council adopted Resolution No. 2002R-53 on February 26, 2002, finding that the Addendum (dated October 29, 2001) to the Mitigated Negative Declaration, including the Modified Mitigation Monitoring Plan No. 004, for the Pointe Anaheim Project were adequate to serve as the required environmental documentation for this request.

DRSP Adjustment No. 5. On May 20, 2003, the City Council approved Adjustment No. 5 relating to various zoning and site development standards including, but not limited to, modifications to minimum lot width, permitted architectural projections into setback areas, minimum distance between driveways and permitted signage in the Pointe Anaheim Overlay by Ordinance No. 5859.

The City Council found that this amendment was categorically exempt from CEQA under CEQA Guidelines Section 15061(b)(3), which provides that where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA.

DRSP Amendment No. 6. On April 25, 2006, the City Council approved Amendment No. 6, pertaining to the Anaheim GardenWalk Project, in connection with amendments to the Land Use Element of the City’s General Plan, Conditional Use Permit No. 4078, the Second Amended and Restated Development Agreement No. 99-01, Tentative Parcel Map No. 2002-205, Final Site Plan No. 2006-2002, and the First Amended and Restated Development Agreement by and between the City of Anaheim and Anaheim GW, LLC. Amendment No. 6 amended the DRSP Land Use Plan, Public Facilities Plan, Design Plan, General Plan Consistency, Zoning and Development Standards, and Conditions of Approval to provide for the development of 569,750 square feet of specialty retail, restaurants, and entertainment, including a multiplex movie theatre; 1,628 hotel rooms/suites (including up to 500 vacation ownership units) and 278,817 square feet of hotel accessory uses; a transportation center; and 4,800 parking spaces and 15 bus spaces. This amendment also changed the project reference from “Pointe Anaheim Lifestyle Retail and Entertainment Complex” to “Anaheim GardenWalk project” and the overlay reference from “Pointe Anaheim Overlay” to “Anaheim GardenWalk Overlay.” Amendment No. 6 and its associated actions were approved by Resolution Nos. 2006-061, 2006-062, 2006-063 adopted on April 11, 2006; and by Ordinance Nos. 6022 and 6023, adopted on April 25, 2006. Prior to approving Amendment No. 6, the City Council, by motion, on April 11, 2006, determined that the previously-approved Pointe Anaheim Initial Study and Mitigated Negative Declaration together with the Second Addendum (dated March 1, 2006) and the Modified Mitigation Monitoring Plan No. 004a, were adequate to serve as the required environmental documentation for this request.

DRSP Adjustment No. 6. On August 22, 2006, the City Council approved Adjustment No. 6 to modify sign standards for the Disneyland Resort Specific Plan by Ordinance No. 6031. The City Council found that previously certified Environmental Impact Report No. 330 for a citywide General Plan Amendment and Zoning Code Update were adequate to serve as the required environmental documentation for this request.

DRSP Amendment No. 7. On April 24, 2007, the City Council approved Amendment No. 7, to modify zoning and development standards pertaining to permitted architectural encroachments in required building setback areas and to modify exhibits pertaining to the maximum number and location of permitted wall signs by approving Resolution No. 2007-048 on April 17, 2007 and adopting Ordinance No. 6056. Prior to approving Amendment No. 7, the City Council, by motion, The Disneyland Resort Specific Plan Appendix A
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
A-4
on April 17, 2007, determined that the previously-approved Second Addendum (dated March 1, 2006) to the Pointe Anaheim Initial Study and Mitigated Negative Declaration was sufficient to serve as the required environmental documentation for this request.

DRSP Adjustment No. 7. On January 29, 2008, the City Council approved Adjustment No. 7 to modify zoning and development standards pertaining to the number of hotel rooms permitted in the Hotel and Theme Park Districts to transfer 25 hotel rooms from the Hotel District to the Theme Park District by Ordinance No. 6093. The City Council found that the previously certified Final EIR No. 311 was adequate to serve as the required environmental documentation for this request.

DRSP Amendment No. 8. On August 23, 2011, the City Council approved Amendment No. 8, in connection with amendments to the Land Use Element of the City’s General Plan, Development Agreement No. 99-01, Conditional Use Permit No. 4078 and Final Site Plan 2006-00002, related to the Anaheim GardenWalk Overlay. Amendment No. 8 included text and exhibit changes to modify and increase the total amount of retail, dining and entertainment (RDE) uses within the Anaheim GardenWalk Overlay by reducing the permitted amount of retail, increasing the permitted amount of dining, increasing the permitted amount of entertainment uses and reducing the size of the bus terminal/facility. The amendments only pertain to the bus terminal/facility and the RDE uses permitted within Development Area of the Anaheim GardenWalk Overlay and do not change the existing building footprint. The amendment did not include any modifications to the hotels and hotel accessory uses permitted within Development A or the RDE uses, hotels, hotel accessory uses or parking permitted within Development Area B. Amendment No. 8 and its associated actions were approved by Resolution Nos. 2011-119, 2011-120, 2011-121, 2011-122 adopted on August 16, 2011 and by Ordinance Nos. 6221 and 6222 adopted on August 23, 2011. Prior to approving Amendment No. 8, the City Council, by motion, on August 23, 2011, determined that the Pointe Anaheim Initial Study and Mitigated Negative Declaration together with the Third Addendum (dated June 6, 2011) serve as the appropriate environmental documentation for this request.

DRSP Adjustment No. 8. On February 23, 2016, the City Council approved Adjustment No. 8 to modify zoning and development standards pertaining to the signs in the GardenWalk Overlay, to remove specific sign criteria and, instead, refer to the Coordinated Signage Program approved in conjunction with Conditional Use Permit No. 4078 so that future changes to signs would be subject to an amendment to the conditional use permit, and not the Code. The City Council adopted Ordinance No. 6361, and determined that the request was categorically exempt from further environmental review under the California Environmental Quality Act (Class 11, Accessory Structures).

DRSP Adjustment No. 9. On October 18, 2016, the City Council approved several amendments to the Zoning Code including Adjustment No. 9 to amend Chapter 18.114 to (1) remove Katella Avenue and West Street/Disneyland Drive from the Sky Exposure Plane requirement for the Hotel District of the Disneyland Resort Specific Plan, such that the permitted height would be subject to the Maximum Permitted Structural Height Map; and (2) remove the limit on the number of vacation ownership units permitted in the Theme Park and Hotel Districts of the Disneyland Resort Specific Plan, consistent with the Anaheim Resort Specific Plan. The City Council adopted Ordinance No. 6382 on October 18, 2016 and determined that the ordinance was not subject to the California Environmental Quality Act ("CEQA") pursuant to Section 15060(c)(2) of the CEQA Guidelines.

The Disneyland Resort Specific Plan Appendix A
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
A-5
DRSP Adjustment No. 10. On December 20, 2016, the City Council approved Adjustment No. 10 to modify zoning and development standards pertaining to icon/themed signage elements in the GardenWalk Overlay, to increase the height limit for the 30-foot iconic signage element to 90 feet in order to accommodate a proposed water tower element. The City Council adopted Ordinance No. 6391 and determined that the request was categorically exempt from further environmental review under the California Environmental Quality Act (Class 11, Accessory Structures).

DRSP Adjustment No. 11. On December 19, 2017, the City Council approved Adjustment No. 11 to modify zoning and development standards such that the permitted encroachments allowed within required setback areas in the C-R District of Anaheim Resort Specific Plan would be allowed within the C-R Overlay of the Disneyland Resort Specific Plan. The City Council adopted Ordinance No. 6425 and determined that the request was exempt from further environmental review under the California Environmental Quality Act Guidelines Section 15060(c)(2).

DRSP Adjustment No. 12. On April 10, 2018, the City Council approved Adjustment No. 12 to modify zoning and development standards to allow Valet Parking as a permitted accessory use when accessory to a primary use that is permitted by right in the Specific Plan area. The City Council adopted Ordinance No. 6432 and determined that the request was exempt from further environmental review under the California Environmental Quality Act Guidelines Section 15061 (b)(3).

DRSP Adjustment No. 13. On December 3, 2019, the City Council approved Adjustment No. 13 to assign review authority of Final Site Plans in the Disneyland Resort Specific Plan to the Planning Director and clarify that parking lots or structures in the Theme Park District are subject to approval by the City Engineer and Planning Director, for vehicular access and parking layout, respectively.

The City Council adopted Ordinance No. 6473 and determined that the request was exempt from further environmental review under the California Environmental Quality Act Guidelines Section 15061 (b)(3).

DRSP Adjustment No. 14. [Withdrawn by the applicant.]
DRSP Adjustment No. 15. On February 9, 2021, the City Council approved Adjustment No. 15 to clarify that dual-lit channel letter signs are not permitted in the Disneyland Resort, Anaheim Resort, and Hotel Circle Specific Plans. The City Council adopted Ordinance No. 6506 and determined that the request was exempt from further environmental review under the California Environmental Quality Act Guidelines Section 15061 (b)(3).

DRSP Amendment No. 9. On [date], the City Council approved DRSP Amendment No. 9 (DisneylandForward), an update to The Disneyland Resort Project to allow for the transfer of uses permitted under the Specific Plan to other areas of the Specific Plan and properties within the Anaheim Resort Specific Plan owned or leased by Walt Disney Parks and Resorts U.S., Inc. or other subsidiaries of The Walt Disney Company (Disney). DRSP Amendment No. 9 also provided for future administrative review by the City of Disney’s development projects on Disney property within the Specific Plan and the Anaheim Resort Specific Plan. DisneylandForward did not increase previously approved square footage or hotel rooms in the Specific Plan or the Anaheim Resort Specific Plan, however it increased the number of theme park-related parking spaces in the The Disneyland Resort Specific Plan Appendix A
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
A-6
Anaheim Resort Specific Plan Parking Overlay by 4,376 spaces. DRSP Amendment No. 9 and its associated actions were approved by [insert] and adopted on [date]. The City Council certified Final Subsequent Environmental Impact Report (SEIR) No. 352 on [date]. In serving as the CEQA compliance document for DisneylandForward, SEIR No. 352 provided the additional environmental analysis contemplated under EIR No. 311 for the addition of theme park, hotel rooms, and retail, dining and entertainment uses in the Southeast District and the expansion of the Theme Park District west of Disneyland Drive. SEIR No. 352 also provided the environmental analysis required for the addition of theme park uses in the ARSP Theme Park East and ARSP Theme Park West Overlays and the additional of parking uses in the ARSP Parking Overlays.

The Disneyland Resort Specific Plan Appendix B
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
B-1
Appendix B: Conditions of Approval
(Language to be inserted once through process).

The Disneyland Resort Specific Plan Appendix C
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
C-1
Appendix C: Mitigation Monitoring Program
(Language to be inserted once through process).

D-1
Conditions of Approval for
Conditional Use Permit No. 4078
Anaheim GardenWalk Project
Approved by City Council Resolution No. 99R-136
(As last amended by Resolution No. 2011-121)
NO. CONDITIONS OF APPROVAL REVIEW BY

1. Prior to issuance of each building permit, unless records indicate previous payment, a fee for street lighting purposes shall be paid to the City of Anaheim based on the length of street frontage in an amount as established by City Council resolution with credit against the fee given for city-authorized improvements installed by the property owner/developer.

Public
Utilities

2. Prior to approval of street improvement plans, pedestrian walkway lighting plans in the public rights-of-way shall be reviewed and approved by the Public Utilities Department, Electrical Services Division, and the Police Department.

Public
Utilities

3. Prior to issuance of each building permit, whichever occurs first, public utility easements (“PUE’s”) shall be recorded and/or abandonment of PUE’s shall be processed to the satisfaction of the Public Utilities Department for the following circumstances:

A. As a result of increases in rights-of-way, where electrical and communication facilities are located adjacent to the existing right-of-way, the facilities shall be either located within the new right-of-way or relocated to new adjacent areas, requiring a PUE.

B. The undergrounding of power and communication lines along the major streets will result in the need to obtain PUE’s for placement of pad mounted equipment and related facilities required as a result of the overhead to underground conversion work.

C. Alterations to existing private buildings and/or construction of new structures (buildings, signs, landscaping elements, etc.) may require relocation of existing electrical and/or communication facilities. This will require abandonment of existing PUE’s and recordation of new PUE’s to accommodate such relocation.

Public
Utilities
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-2
NO. CONDITIONS OF APPROVAL REVIEW BY

4. A. Prior to approval of street improvement plans, roadway lighting of all public streets shall be designed in accordance with the Anaheim Resort Identity Program and associated construction specifications to the satisfaction of the Planning Department, Planning Services Division and the Public Works Department.

B. Prior to approval of street improvement plans, unless records indicate previous payment, the property owner/developer shall pay or cause to be paid all costs associated with replacing the existing City of Anaheim street light system within the public rights-of-way adjacent to or within The Disneyland Resort Specific Plan Area with street lights designed in accordance with the Anaheim Resort Identity Program to the satisfaction of the Public Utilities Department, Electrical Services Division.

Public
Utilities

5. That prior to approval of tentative tract or parcel maps, the following street design elements shall be shown on each tentative tract or parcel map to the satisfaction of the Department of Public Works:

A. Street cross-sections, including dimensions, labels, General Plan Circulation Element designation (i.e., Resort Secondary), and whether public or private;
B. Street grades and vertical alignment; and
C. Horizontal alignment, including centerline radii, and cul-de-sac radii.

Public Works

6. Prior to approval of each final tract or parcel map, vehicular access rights to all public streets adjacent to subject tract or parcel, except at approved access points, shall be released and relinquished to the City of Anaheim, to the satisfaction of the Department of Public Works.

Public Works

7. Prior to approval of each street improvement plan, the following shall be provided for a one (1) year maintenance period (commencing at completion of final building and zoning inspections), in a manner acceptable to the Department of Public Works:

A. Public Realm parkway and median island landscaping and irrigation maintenance. (The “Public Realm” is described in subsection 5.3 “Landscape Concept Plan” of Section 5.0 “Design Plan” of The Disneyland Resort Specific Plan document.)
B. Provision for replacement of any tree planted in accordance with landscaping plans in a timely manner in the event that it is removed, damaged, diseased and/or dies.

Public Works
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-3
NO. CONDITIONS OF APPROVAL REVIEW BY

8. All engineering requirements of the City of Anaheim, including preparation of improvement plans and installation of all improvements such as curbs and gutters, sidewalks, water facilities, street grading and pavement, sewer and drainage facilities, or other appurtenant work shall be complied with as required by the Department of Public Works and in accordance with specifications on file in the Office of the City Engineer, as may be modified by the Department of Public Works; and that security in an amount and form satisfactory to the Department of Public Works, shall be posted with the City to guarantee the satisfactory completion of said improvements. Said security shall be posted with the City prior to the issuance of building permits or prior to approval of a final subdivision map to guarantee the installation of the related improvements prior to final building and zoning inspections.

Public Works

9. Prior to issuance of building permits, the property owner/developer shall ensure to the satisfaction of the Fire Department that an all-weather road/driving surface shall be provided from the roadway system to and on the construction site and to fire hydrants at all times, before building materials are placed on a building site. Such routes shall be paved or, subject to approval of the Fire Department, shall otherwise provide adequate emergency access.

Fire

10. Prior to issuance of grading and building permits, the property owner/developer shall ensure that all lockable pedestrian and/or vehicular access gates shall be equipped with “knox box” devices as required and approved by the Fire Department.

Fire

11. Prior to approval of on-site water plans, unless each commercial building is initially connected to separate fire services, an unsubordinated covenant satisfactory to the City Attorney’s Office shall be recorded prohibiting any individual sale of buildings until separate fire services are installed in the building(s) subject to the sale.

Fire
City Attorney

12. Prior to approval of landscape plans for any areas within seven (7) feet of public sidewalks, unless determined unnecessary by the Department of Public Works, root and sidewalk barriers for trees (with the exception of palm trees) shall be shown on said landscape plans. Prior to final building and zoning inspection, root and sidewalk barriers shall be installed to the satisfaction of the Department of Public Works.

Public Works

13. Prior to approval of landscaping plans, the property owner/developer shall indicate on said plans, to the satisfaction of the Planning Department, Planning Services Division and Department of Public Works, Resort Services Division, that all trees planted in the Public Realm will be planted in accordance with the standard City specifications.

Planning
Public Works
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-4
NO. CONDITIONS OF APPROVAL REVIEW BY

14. Prior to final building and zoning inspections, a licensed landscape architect shall certify to the Planning Department, Planning Services Division that all landscaping has been installed in accordance with landscaping plans approved by the City and on file with the Building Division of the Planning Department.

Any deviation from the plant palette shown on the approved landscape plans shall be submitted for review and approval by the Planning Department, Planning Services Division. All irrigation equipment within the setback area shall be fully screened so that the equipment is not visible from the public right-of-way. Prior to final building and zoning inspections for the setback area, additional planting may be required for screening purposes to the satisfaction of the Planning Department, Planning Services Division.

Planning

15. On-site non-Public Realm landscaping and irrigation systems, and Public Realm landscaping and irrigation systems within areas in which dedication has not been accepted by the City, shall be maintained by the property owner/developer in compliance with City standards.

Planning

16. Any tree planted within the Setback Realm shall be replaced in a timely manner in the event that it is removed, damaged, diseased and/or dies. (The “Setback Realm” is described in subsection 5.3 “Landscape Concept Plan” of Section 5.0 “Design Plan” of The Disneyland Resort Specific Plan document.) Planning

17. Prior to approval of landscape plans, plans shall include a note that a licensed arborist shall be responsible for all tree trimming within the Setback Realm.

Planning

18. Prior to approval of each Final Site Plan, plans shall show that no less than twenty percent (20%) of the interior courtyards shall be landscaped with a variety of shrubs, groundcover, mature trees and potted plants to create a lush garden environment for the pedestrian (this landscaping is in addition to the required landscaped setback areas, as is measured by shade coverage). Seating areas and decorative features including, but not limited to, interactive and decorative water fountains and works of art, may also be included in this percentage. Adjacent to solid portions of building walls (i.e., where there are no store-front windows), small grouping of trees or shrubs, raised planters and site furnishings shall be located to minimize views of blank walls.

Planning

19. Prior to approval of each Final Site Plan, plans shall show that major project entries shall be enhanced with a more densely planted shrub palette utilizing annual color, perennial color and accent trees, to the satisfaction of the Planning Department.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-5
NO. CONDITIONS OF APPROVAL REVIEW BY

20. Prior to issuance of grading and/or building permits, the property owner/developer shall document on grading and/or building plans that a construction barrier at the construction project perimeter areas (adjacent to public rights-of-way and/or other private property) be installed prior to commencement of construction activity. Subsequent to installation, property owner/developer shall notify the Planning Department, Planning Services Division that said construction barrier has been installed. The construction sound barriers shall be a minimum height of eight (8) feet with a minimum surface weight of one and one-quarter pounds (1.25 lbs.) per square foot or a minimum Sound Transmission Class Rating (STC) of 25. The structure shall be a continuous barrier. Gates and other entry doors shall be constructed with suitable mullions, astragals, seals, or other design techniques to minimize sound leakage when in the closed position. Access doors should be self closing where feasible. Vision ports are permissible providing they are filled with an acceptable solid vision product.

Plannin

21. Sweeping operations in the parking facilities and private streets or on-site roadways shall be performed utilizing sweeping/scrubbing equipment which operates at a sound level measuring not greater than 60 dBA at the nearest adjacent property line.

Planning

22. Pressure washing operations for purposes of building repair and maintenance due to graffiti or other aesthetic considerations shall be limited to daytime hours of operation between 7:00 a.m. and 8:00 p.m.

Planning

23. Prior to issuance of building permits for the parking structures, a note shall be placed on the building plans which states, to the satisfaction of the Planning Department, that, in conjunction with construction of the parking structure, no impact drive piles shall be allowed.

Planning

24. Prior to approval of final site plans and issuance of building and grading permits, plans shall be submitted to the Planning Department that document compliance with Specific Plan No. 92-1, as amended.

Planning

25. Each Final Site Plan for the Anaheim GardenWalk project shall be prepared in conformance with Chapters 18.114.040 (Disneyland Resort Specific Plan) and

18.116.040 (Anaheim Resort Specific Plan) Final Site Plan submittal requirements. Prior to issuance of building permits, construction plans shall be in substantial conformance with said Final Site Plans.

Planning

26. Prior to issuance of building permits, unless records indicate previous payment, a fee for street tree purposes shall be paid or caused to be paid to the City of Anaheim based on the length of street frontage in an amount as established by City Council resolution with credit against the fee given for City-authorized improvements installed by the property owner/developer.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-6
NO. CONDITIONS OF APPROVAL REVIEW BY

27. Prior to issuance of building permits, the property owner/developer shall document on building plans, to the satisfaction of the Planning Department, Planning Services Division, that all air conditioning facilities and other roof and ground mounted equipment shall be shielded from public view as required by The Disneyland Resort Specific Plan and the sound buffered to comply with the City of Anaheim noise ordinances from any adjacent residential or transient-occupied properties. That as part of final building and zoning inspections, compliance shall be verified. Additionally, all exterior appurtenances such as conduits shall be minimized and integrated into the structure; and that any rain gutters and downspouts and vents shall be finished to match the building materials and/or colors.

Planning

28. Prior to issuance of building permits, the property owner/developer shall document on said plans, to the satisfaction of the Planning Department, Planning Services Division, that all plumbing or other similar pipes and fixtures located on building exteriors shall be fully screened from view of adjacent public rights-of-way and from adjacent properties by architectural devices and/or appropriate building materials. That as part of final building and zoning inspections, compliance shall be verified.

Planning

29. The property owner/developer shall be responsible for removal of any on-site graffiti within twenty-four (24) hours of its application.

Planning

30. The conceptual location and configuration of all lighting fixtures including ground-mounted lighting fixtures shall be shown on each Final Site Plan. That prior to issuance of building permits, plans submitted for building permits shall document, to the satisfaction of the Planning Department, Planning Services and Building Divisions, the location and configuration of all lighting fixtures including ground-mounted lighting fixtures utilized to accent buildings and landscape elements, or to illuminate pedestrian areas. All lighting shall be shielded to direct lighting toward the area to be illuminated.

That as part of final building and zoning inspections, compliance shall be verified.

Planning

31. Prior to approval of each Final Site Plan, the property owner/developer shall document on plans, to the satisfaction of the Planning Department, Planning Services Division, that building elevations shall show that the rear elevations of buildings visible from a five (5) foot high view point from off-site areas shall be architecturally accented to portray a finished look.

Planning

32. Prior to recordation of a subdivision map, in the event a parcel is subdivided and there is a need for common on-site circulation and/or parking, an unsubordinated covenant providing for reciprocal access and/or parking, as appropriate, approved by the Department of Public Works and the Planning Department, Planning Services Division, and in a form satisfactory to the City Attorney, shall be recorded with the Office of the Orange County Recorder.

Public Works
Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-7
NO. CONDITIONS OF APPROVAL REVIEW BY

33. No shuttle/bus/vehicular drop-off areas shall be permitted in hotel/motel or vacation resort front setback areas.

Planning

34. In connection with submittal of the first Final Site Plan for Area A the property owner/developer shall submit a comprehensive sign program. Each subsequent Final Site Plan shall include a sign program that shall be in compliance with the comprehensive sign program and the development standards of the Anaheim GardenWalk Overlay. The comprehensive sign program shall at a minimum include the following:

A. A sign theme/concept which demonstrates an overall appearance quality and type of sign, banner or other display device; the quality of such signage shall be equivalent to those utilized at Universal City Walk, Fashion Island or Irvine Spectrum. This is a quality standard and is not intended, nor does it provide, additional signage rights or permit any specific type of sign which does not conform with the signage regulations set forth in The Disneyland Resort Specific Plan, as amended per the Anaheim GardenWalk Overlay.

B. Sign criteria for interior corporate sponsorship displays (said displays could include “jumbotrons,” banners or placards) which are oriented towards the interior of the Anaheim GardenWalk project. The staff report to the Planning Commission shall include a recommendation by the Planning Director regarding his or her determination as to the orientation of such displays. Such displays shall not be visible from the public rightof-way at an equal elevation as the Anaheim GardenWalk property line (measured at five (5) feet above the grade of the sidewalk on the opposite side of the street from the Anaheim GardenWalk project) except through the limited view corridors set forth in the Anaheim GardenWalk Overlay.

C. Sign criteria limiting interior wall signs from projecting more than fifty percent (50 %) of the vertical height of the sign above the roof parapet or fifty (50%) of the horizontal length of the sign beyond the side of a building.

D. Sign Criteria consistent with the adopted sign regulations for the Anaheim GardenWalk Overlay.

E. Standards for maintenance and replacement of damaged/broken signs and banners and installation and maintenance of changeable sign copy neon signage or electronic readerboards.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-8
NO. CONDITIONS OF APPROVAL REVIEW BY

35. Prior to issuance of building permits for the retail and parking structure component of Area A, the property owner/developer shall submit final design plans for the icon/themed signage element indicated on Exhibit No 12 of this conditional use permit and that the height of the icon element would be reduced from a maximum height of 120 feet to a maximum height of 75 feet as measured from the grade level of the sidewalk on Disney Way and that lighting on the icon will be limited to subtle lighting that slowly changes colors. If the icon element does not include any signage visible from the public rights-of-way at an equal elevation as the Anaheim GardenWalk property line (measured at five (5) feet above the grade of the sidewalk on the opposite side of the street from the Anaheim GardenWalk project), plans shall be reviewed by the Planning Director for substantial conformance with the Final Site Plans.

If the icon includes any signage, a conditional use permit in compliance with Section 18.114.130.020.0201.02(b) and 18.114.130.060.0602.05 shall be required, with the maximum height and design of the element subject to the review and approval of the Planning Commission. Preliminary design plans for said icon/ themed element without signage shall be shown on plans submitted as part of Final Site Plans subject to the review and approval of the Planning Commission. Said plans shall include the location, design, height, dimensions, and lighting scheme of the icon/themed structure. Final design plans shall be subject to the review and approval of the Planning Director prior to the issuance of building permits and/or may be recommended for review and approval by the Planning Commission as a report and recommendation item at the sole discretion of the Planning Director
Planning

36. Prior to issuance of each sign permit the property owner/developer/tenant shall submit a letter and plans demonstrating that the sign plans conform with the comprehensive sign program approved by the Planning Commission and with the business identification sign locations for Disney Way and Katella Avenue.

Planning
37A. Prior to approval of each Final Site Plan, the property owner/developer shall submit the anticipated construction schedule for each of the remaining project components by development phase; and that an updated schedule shall be submitted to the Planning Department every six (6) months until the project is completed, or as deemed necessary by the Planning Department.

Planning
37B. The property owner/developer shall be responsible for all costs associated with the review of each Final Site Plan application by an architect, licensed by the State of California and selected by the City, to review the Final Site Plan for conformance with Section 5.0 “Design Plan” of The Disneyland Resort Specific Plan. The property owner/developer shall pay all costs associated with this review prior to each Final Site Plan being scheduled for a Planning Commission meeting.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-9
NO. CONDITIONS OF APPROVAL REVIEW BY

38. Prior to issuance of each building permit for a parking structure, a line-of-sight study shall be submitted for review and approval by the Planning Department which shows that any light poles on the roof-top areas of the parking structure, if proposed, shall not be visible from the adjacent public rights-of-way, as measured from a five (5) foot high view point from adjacent off-site areas.

Planning

39. No exterior-mounted air conditioning facilities for individual hotel rooms or vacation ownership rooms shall be permitted in the Anaheim GardenWalk Overlay.

Planning

44. Prior to approval of each Final Site Plan, plans shall show how all on-site service and loading area operations shall be screened from the public rights-ofway to the satisfaction of the Planning Department.

Planning

41. A comprehensive sign program for Area B shall be submitted in conjunction with the first Final Site Plan in Area B for review and approval by the Planning Commission. The comprehensive sign program shall be in compliance with the sign standards and regulations contained within The Disneyland Resort Specific Plan.

Planning

42. The subject property shall be developed in substantial conformance with plans and specifications submitted to the City of Anaheim by the applicant and which plans are on file with the Planning Department marked Exhibit Nos. 1 through 12 of Conditional Use Permit No. 4078 and Exhibit Nos. 1 through 17 of Final Site Plan No. 2006-00002 (which includes Exhibits Nos. 1 through 12 of Conditional Use Permit No. 4078), as amended. The Anaheim GardenWalk project shall be developed in accordance with the quality, design and architectural integrity as shown on the exhibits.

Planning

43. Prior to approval of each Final Site Plan and prior to issuance of each building permit, the Anaheim Police Department shall review and approve plans for safety, accessibility, crime prevention, and security provisions during both the construction and operative phases.

Police

44. Prior to issuance of the first building permit, the plans which are required to be submitted for the police/security office (to comply with the mitigation measures identified in Modified Mitigation Monitoring Plan No. 004a) shall make provision for the police/security office in accordance with the requirements of Development Agreement No. 99-01, as amended, to the satisfaction of the Police Department. Plans shall also specifically identify the parking spaces designated for such police/security office.

Police
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-10
NO. CONDITIONS OF APPROVAL REVIEW BY

45. Prior to issuance of building permits for parking structures, plans submitted for building permits shall be approved by the Police Department to ensure that safety and security measures are incorporated, including the use of bidirectional antennae to insure performance of public safety radio communications equipment (800 Mhz) in eighty-five percent (85%) of any structure or developed area, or in compliance with public safety radio system coverage requirements in effect at the time of the issuance of building permits.

Prior to final building and zoning inspections, installation of required antennae shall be verified.

Police

46. Prior to issuance of building permits, plans submitted for building permits shall document that trash storage areas be provided and maintained in locations acceptable to the Department of Public Works, Streets and Sanitation Division and in accordance with approved plans on file with said Department.

Public Works

47. Prior to issuance of building permits, plans submitted for building permits shall be reviewed to ensure that gates shall not be installed across any driveway or private street in a manner which may adversely affect vehicular traffic in the adjacent public streets and that all parking facilities conform to City standard plans. Installation of any gates shall conform to Standard Plan No. 402-B (“Parking Structure & Ramp Standard Detail”) and Standard Plan No. 475 (”Gate Standard for Residential/Commercial/Industrial”) and shall be subject to the review and approval of the Public Works Department, Traffic Engineering Division and the Planning Department, Planning Services Division prior to issuance of a building permit.

Public Works

48. Prior to approval of each Final Site Plan, plans for vehicular and pedestrian circulation shall be submitted to the Department of Public Works, Traffic Engineering Division for review and approval showing conformance with Section 5.0 “Design Plan” of the Specific Plan.

Public Works

49. Prior to issuance of building permits for parking structures, internal signage plans shall be designed to enhance smooth traffic flows on each level of the parking structure and shall be submitted to the Planning Department, Planning Services Division and Department of Public Works, Traffic Engineering Division for review and approval.

Planning
Public Works

50. Prior to issuance of building permits, the property owner/developer shall prepare a plan of operations for review and approval by the Department of Public Works, and shall provide proof of their participation in the Anaheim Transportation Network (“ATN”) to the Department of Public Works, Traffic Engineering Division.

Public Works
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-11
NO. CONDITIONS OF APPROVAL REVIEW BY

51. Prior to approval of the Final Site Plan for the area encompassing the driveway for Anaheim GardenWalk adjacent to the driveway for the Super 8 Motel at 415 West Katella Avenue, the Final Site Plan shall show that the driveway has been redesigned to combine the driveways or to meet the distance requirement set forth in The Disneyland Resort Specific Plan (i.e., minimum forty (40) foot wide distance between driveways serving adjacent parcels). If redesigned to combine the driveways, proof of an agreement with the adjacent property owner shall also be provided to the satisfaction of the City Attorney’s Office.

Public Works
City Attorney

52. Prior to approval of the first Final Site Plan for Area A, and prior to approval of the first Final Site Plan for Area B, the property owner/developer shall submit conceptual street improvement plan cross-sections (to be shown on the Final Site Plan) to the Department of Public Works, Development Services Division for the installation of the ultimate public right-of-way improvements for adjacent public streets. Prior to the approval of the final subdivision map for Area A, and prior to approval of grading plans if a subdivision map is not proposed for Area B, the property owner/developer shall submit final street improvement plans for review and approval by the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvement plan and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. These improvements shall be completed prior to the first final building and zoning inspections for Area A and Area B.

Public Works

53. Prior to approval of the first Final Site Plan for Area A, conceptual street improvement plans shall be prepared for the construction of a free right-turn lane on the south side of Disney Way from the parking garage driveway exit to Clementine Street (thirteen (13) foot lane width) in order to improve outbound parking structure operations. Prior to the approval of the final subdivision map for Area A, the property owner/developer shall submit final street improvement plans for the construction of the free right-turn lane for review and approval by the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvement plan and all costs associated with the construction of the improvements to the satisfaction of the Public Works Director. These improvements shall be completed prior to the first final building and zoning inspection for Area A. A portion of the free right-turn lane on Disney Way may be utilized as a bus loading/unloading zone on an interim basis until such time that Area B is developed, subject to the review and approval of striping plans by the Department of Public Works, Traffic Engineering Division.

Public Works
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-12
NO. CONDITIONS OF APPROVAL REVIEW BY

54. Prior to approval of the first Final Site Plan for Area A, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works, Development Services Division for intersection improvements, including construction of a driveway on the south side of Disney Way to provide signalized ingress and egress, including a signal plan and a pedestrian cross walk, between Anaheim GardenWalk and westbound and eastbound traffic along Disney Way. Final street improvement plans shall be submitted for review and approval by the Department of Public Works prior to approval of the final subdivision map. The property owner/developer shall be responsible for all costs associated with the preparation and processing of said street improvement plans and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works, Development Services Division. These improvements shall be completed prior to the first final building and zoning inspection for Area A.

Public Works

55. Prior to approval of the Final Site Plan for Area B, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works for construction of a right-turn lane on the south side of Disney Way from Harbor Boulevard to the mid-block project entrance.

Prior to the approval of the final subdivision map, or prior to approval of grading plans if a subdivision map is not proposed for Area B, the property owner/developer shall submit final street improvement plans for review and approval by the Department of Public Works, Development Services Division.

The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvements plan and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works. These improvements shall be completed prior to the first final building and zoning inspection for Area B.

Public Works

56. Prior to approval of the first Final Site Plan for Area A, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works, Development Services Division for the interim condition to provide a single left turn lane in Disney Way between the midblock project entrance and Clementine Street. Prior to the approval of the final subdivision map for Area A, the property owner/developer shall submit final street improvement plans for review and approval of the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvements plan and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works.

These improvements shall be completed prior to the first final building and zoning inspection for Area A.

Public Works
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-13
NO. CONDITIONS OF APPROVAL REVIEW BY

57. Prior to approval of the first Final Site Plan for Area B, the property owner/developer shall submit conceptual street improvement plans to the Department of Public Works, Development Services Division for the ultimate condition to provide duel left turn lanes in Disney Way between the mid-block project entrance and Clementine Street. Prior to the approval of the final subdivision map, or prior to approval of grading plans if no subdivision is proposed for Area B, the property owner/developer shall submit final street improvement plans for review and approval of the Department of Public Works, Development Services Division. The property owner/developer shall be responsible for all costs associated with the preparation and processing of the street improvement plans for the duel left turn lanes and all costs associated with the construction of the improvements to the satisfaction of the Department of Public Works. These improvements shall be completed prior to the first final building and zoning inspection for Area B.

Public Works

58. In connection with submittal of each Final Site Plan application, the property owner/developer shall provide information regarding the ownership and/or long term lease status of each of the underlying parcels, including any airspace or vertical subdivision, of the 29.1 acre Anaheim GardenWalk project (i.e., whether the parcels are owned, leased, under negotiation, etc.).

Planning

59. Prior to Planning Commission review of each Final Site Plan, a notice shall be mailed to the property owners within a three hundred (300) foot radius of Anaheim GardenWalk advising them of the Planning Commission meeting.

Planning

60. Prior to issuance of the first grading permit, and updated on a monthly basis during construction, the property owner/developer shall submit a plan, for review and approval by the Department of Public Works, identifying (and updating) the sequence and timing of all street improvements along Disney Way, Clementine Street, Katella Avenue and Harbor Boulevard. Said street improvement plans shall include all driveways, traffic signals, pedestrian cross walks, etc. The phasing and timing for commencing and completing any or all of the street improvements shall be as required by Department of Public Works.

Public Works

61. Prior to issuance of building permits, building plans shall document that water backflow equipment and any other large water system equipment shall be installed behind the Setback Realm area in a manner fully screened from all public streets and alleys. Prior to final building and zoning inspections, compliance with this condition shall be verified by the Public Utilities Department, Water Utility Division.

Public
Utilities

62. Prior to issuance of water improvement plans, the property owner/developer shall document on water improvement plans, to the satisfaction of the Public Utilities Department, Water Engineering Division, that water service is available.

Public
Utilities
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-14
NO. CONDITIONS OF APPROVAL REVIEW BY

63. The property owner/developer shall be held responsible for compliance with the mitigation measures and for implementation of the project design features identified in Modified Mitigation Monitoring Program No. 004a in compliance with Section 21081.6 of the Public Resources Code. Furthermore, the Anaheim GardenWalk property owner/developer shall be responsible for any direct costs associated with the monitoring and reporting required to ensure implementation of those mitigation measures and project design features identified in Modified Mitigation Monitoring Program No. 004a. Modified Mitigation Monitoring Program No. 004a, which includes mitigation measures and project design features, is attached and made a part of these conditions of approval.

Planning

64. Prior to approval of each Final Site Plan, the following plans/materials/information shall be provided for review and approval by the Planning Department:

A. A site plan showing all proposed project components of the development phase including, but not limited to, all buildings, landscape areas, parking areas, and the adjacent street improvements. Conceptual hardscape areas, fountains/water features and works of art will also be shown.

B. Preliminary Mass Grading Plans.

C. Conceptual elevation plans showing all views of each proposed building.

D. Roof-top plans for each building showing all roof-top equipment (roof-top equipment is required to be fully-screened by the architecture of the building and painted in a color to match the color of the roof).

E. Preliminary floor plans for each level of the parking garage (all parking spaces shall be dimensioned and the total number of spaces on each level shall be shown on the plan).

F. Preliminary landscape plans showing all proposed planting materials and the proposed landscape plant/tree palette, including color photographs, to show the proposed trees, shrubs and groundcover.

G. Above- and below-ground utility equipment shall be shown on each site plan and landscape plan. Plans must indicate how any above-ground equipment is fully screened by landscaping from any public view.

H. Conceptual colored renderings of the site improvements to show the building elevations from Harbor Boulevard, Katella Avenue, Clementine Street, and Disney Way, and views of the interior portions of the site.

Additionally, where a development phase adjoins a future development phase (as yet undeveloped), a colored rendering shall be provided to illustrate the building elevation(s) facing that future phase.

I. Preliminary material and color boards for each building, including the parking structure, which show that all building colors, textures and materials shall be compatible between on-site uses. The preliminary color boards shall show the proposed decorative paving materials for the interior courtyard areas of the site and pedestrian gathering areas will be compatible Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-15
NO. CONDITIONS OF APPROVAL REVIEW BY
with on-site uses. The design and location of the walkways shall not impact the placement of trees in the public right-of-way parkways. In addition, the walkways shall not preclude the planting of the number of trees required for the setback area by The Disneyland Resort Specific Plan Design Plan.

J. Letter from the property owner/developer indicating how the Final Site Plan is in compliance with The Disneyland Resort Specific Plan requirements and Conditional Use Permit No. 4078, as amended.

K. That the lighting fixture plan shall include the style of the fixtures which shall be compatible with the project theme.

L. That any existing adjacent development on the 29.1-acre Anaheim GardenWalk site shall be shown on the site plan or other appropriate plan(s) to clearly illustrate the relationship between the proposed construction on each development phase and existing development/uses on adjoining development phase(s). Such additional information is intended to illustrate vehicle and pedestrian circulation between development phases, access to public rights-of-way, shared parking spaces, continuity of building design and placement (including the parking structure), etc.

M.That the developer shall provide information regarding the development status of the other development phases (i.e., vacant, pre-existing use, construction underway in accordance with Anaheim GardenWalk uses, construction completed in accordance with Anaheim GardenWalk uses, etc.) for the entire 29.1-acre Anaheim GardenWalk site.

N. That in connection with development in the Anaheim GardenWalk Overlay, submittal of any Final Site Plan adjacent to a development phase which is vacant or which is not developed in accordance with Anaheim GardenWalk Overlay shall show that a minimum ten (10) foot setback, fully landscaped, shall be provided and maintained along the property line

65. Number not used N/a

66. If Area B is not developed in accordance with the Anaheim GardenWalk Overlay, it may be developed in accordance with The Disneyland Resort Specific Plan No. 92-1, District A provisions.

Planning

67. If Area B is developed in accordance with the Anaheim GardenWalk Overlay, prior to approval of a Final Site Plan, the property owner shall demonstrate on plans and show that development of Area B shall be fully integrated with Area A and that Areas A and B will be operated as a single integrated project.

Planning

68. Prior to advertising for any special event which will draw visitors to the Anaheim GardenWalk project, a special events permit shall be obtained.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-16
NO. CONDITIONS OF APPROVAL REVIEW BY

69. Granting of the parking waiver is contingent upon operation of the use in conformance with the assumptions and/or conclusions relating to the operation and intensity of use as contained in the Transportation Analysis Update prepared by Iteris, Inc for the Addendum to the Pointe Anaheim Initial Study/Mitigated Negative Declaration Anaheim GardenWalk Project, dated March 17, 2011, that formed the basis for approval of said waiver. Exceeding, violating, intensifying or otherwise deviating from any of said assumptions and/or conclusions, as contained in the Transportation Analysis Update prepared by Iteris, Inc for the Addendum to the Pointe Anaheim Initial Study/Mitigated Negative Declaration Anaheim GardenWalk Project, dated March 17, 2011 shall be deemed a violation of the expressed conditions imposed upon said waiver which shall subject this conditional use permit to termination or modification pursuant to the provisions of the Anaheim Municipal Code.

Planning

70. Following completion of construction of the 3,050 space parking structure in Area A, and on-going during project operation, the property owner/developer shall provide overflow parking to the Anaheim Convention Center in accordance with the “Parking Facilities Operating Lease”, as may be amended, as part of the Disposition and Development Agreement by and between Anaheim GW, LLC and the City of Anaheim.

Community
Development
Convention,
Sports and
Entertainment

71. Prior to approval of the first Final Site Plan for Area B, the property owner/developer shall submit a parking analysis to the Planning Department for review and approval, showing that the proposed number of parking spaces (1,600 spaces in Area B) will be adequate for Area B (i.e., the proposed land uses and building areas). Further, because the parking for the Anaheim GardenWalk project may be shared between multiple land uses in Areas A and B, said analysis shall include information regarding the number of parking spaces, the land uses and the building areas in the previously approved portions of the project. If the parking analysis concludes that additional parking spaces are necessary to accommodate the parking demands of Areas A and B, as well as the overflow parking for the Anaheim Convention Center, as prescribed in the “Parking Facilities Operating Lease”, as may be amended, as part of the Disposition and Development Agreement by and between Anaheim GW, LLC and the City of Anaheim, said spaces shall be shown on plans submitted for Final Site Plan approval.

Planning
Community
Development
Convention,
Sports and
Entertainment

72. The Anaheim GardenWalk project shall be developed in accordance with Development Agreement No. 99-01, as amended.

Planning

73. Aapproval of this conditional use permit is contingent upon the approval and adoption of General Plan Amendment No. 2010-00481 and Amendment No. 8 to The Disneyland Resort Specific Plan No. 92-1.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-17
NO. CONDITIONS OF APPROVAL REVIEW BY

74. The property owner/developer shall construct the Anaheim GardenWalk project in accordance with the following limitations:

A. The property owner/developer will not seek to change the entitlements for the one thousand six hundred twenty eight (1,628) hotel rooms/suites to any other use; provided, however, that the owner/developer may elect to construct up to 400 Vacation Ownership Units in lieu of 400 Hotel Rooms in Area A and up to 100 Vacation Ownership Units in lieu of 100 Hotel Rooms in Area B of the project, and provided further, that the property owner/developer may elect to construct the remaining hotel rooms as Condominium Hotels as defined in Code Section No. 18.114.020.0202 of The Disneyland Resort Specific Plan No 92-1, Anaheim GardenWalk Overlay and as defined in Development Agreement No. 99-01, as amended. As a condition of such election, the property owner/developer shall enter into subsequent agreements with the City that provide the City with “in-lieu” payments to be made at a mutually acceptable time(s), and in amounts not in excess of the equivalent Transient Occupancy Taxes to which the City would be entitled if such Vacation Ownership Units and Condominium Hotel units were occupied as traditional hotel rooms.

B. The design of the Anaheim GardenWalk project shall incorporate the hotels as integral components of the site plan, and the Anaheim GardenWalk project’s construction shall be consistent with said plan.

Planning

75. A public art program shall be installed within the boundaries of the Anaheim GardenWalk project. Prior to approval of the first Final Site Plan, the public art element concept (including location, description and budget), shall be submitted to the City of Anaheim for review and approval. The public art element shall be installed prior to the first final building and zoning inspections for the structures or components in the development phase in which it is proposed to be located, excluding the parking structure.

Planning

76. Deleted by Resolution No. 2011-121. Planning

77. The land uses permitted in each development phase shall comply with The Disneyland Resort Specific Plan No. 92-1 document, as amended.

Planning

78. The project development density shall not exceed that which is specified in the City of Anaheim General Plan, Land Use Element, Table LU-4 “General Plan Density Provisions for Specific Areas of the City”, and The Disneyland Resort Specific Plan No. 92-1, as amended for the Anaheim GardenWalk Overlay.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-18
NO. CONDITIONS OF APPROVAL REVIEW BY

79. Prior to issuance of the first building permit or approval of the first grading permit, whichever occurs first, for development that incorporates all or a portion of the following parcel(s), the property owner(s) shall submit a letter to the Planning Department requesting termination of the zoning petitions associated with said underlying parcel(s) (which zoning entitlements are not associated with the Anaheim GardenWalk project), as follows:

Pyrovest (Anaheim Plaza Hotel and Suites) parcel
Variance No. 1021: Approved by the Planning Commission under Resolution No. 40, Series, 1958-1959, to establish a motor hotel and appurtenant uses at 1660-1720 South Harbor Boulevard; and by the City Council on September 2, 1958 under Resolution No. 4733 regarding only the “appurtenant uses”) Variance No. 3433: Approved on October 29, 1984 under Resolution No.

PC84-225 for waiver of permitted number and type of flags to retain 25 roofmounted flags in the CR Zone at 1700 South Harbor Boulevard) Planning

80. Prior to approval of final site plans for any vacation ownership resort units within the Anaheim GardenWalk Overlay, the property owner/developer shall submit information to the Planning Department indicating the provision of facilities, amenities, or design features usually associated with hotels (for example, lobbies, check-in areas, registration desks, service closets, laundry facilities, etc) in compliance with Code Section 18.114.120.050.0503, and further, whether any kitchen facilities suitable for visitors are proposed, in compliance with Code Section 18.114.120.050.0504. Plans and information submitted for final site plan approval shall be in compliance with Code Section

18.114.070, excepting Subsection .0712 (required parking demand study).

Planning

81. A. Prior to approval of each final site plan for a condominium hotel, CC&R’s and a Master Lease shall be submitted to the Planning Department and the City Attorney’s Office for review and approval. The final CC&Rs and Master Lease shall be consistent with Conditional Use Permit No. 4078, as amended, on file in the Planning Department, The Disneyland Resort Specific Plan and the City of Anaheim General Plan. The CC&Rs and Master Lease shall not be amended or terminated without the prior written approval of the Planning Director and modification of land use permits as may be required to authorize and reflect the changes in the CC&Rs and/or the Master Lease.

B. Prior to approval of each final site plan for a condominium hotel, the property owner/developer shall have a title company review the airspace condominium map and certify that the airspace condominium map has created insurable units for sale as commercial condominium units.

C. On-going during project operation, any non-residential condominium hotel developed as part of this project shall be maintained and operated as a hotel (with the exception of the proposed financing structure), as approved by Conditional Use Permit No. 4078 and in accordance with approved final site plans.

Planning
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-19
NO. CONDITIONS OF APPROVAL REVIEW BY
D. On-going during project operation, Transient Occupancy Tax shall be collected for all non-residential condominium hotel rooms as set forth in Chapter 2.12 (Transient Occupancy Tax) of the Anaheim Municipal Code.

E. On-going during project operation, for any non-residential condominium hotel, owners use of airspace condominium units shall be limited to fourteen (14) days per calendar year, and shall be subject to the payment of Transient Occupancy Tax based upon the hotel room rate of a comparable hotel room.

F. On-going during project operations, any non-residential condominium hotel developed as part of this project shall be managed, maintained and operated by a single qualified professional entity.

G. On-going during project operations, at no time shall any hotel rooms developed as part of this project be occupied as residential dwelling units.

82. Approval of this application constitutes approval of the proposed request only to the extent that it complies with the Anaheim Municipal Zoning Code and any other applicable City, State and Federal regulations. Approval does not include any action or findings as to compliance or approval of the request regarding any other applicable ordinance, regulation or requirement.

Planning

83. The owner/manager for any ABC licensed location or Entertainment business shall submit a detailed security plan for approval of the Chief of Police or his/her designee that includes security measures including the number of security personnel. Security personnel will comply with Business and Professions code 7574. Any amendments to the plan shall be approved by the Chief of Police or his/her designee and shall also be filed with the Police Department, Vice Detail and the Planning Department.

Planning
Police

84. Within sixty (60) days of the approval of Conditional Use Permit No. 4078E, the property owner or his/her designee shall submit a detailed security plan to address the additional security needs created by the changing tenant mix. This plan should included minimum staffing levels by day and time. Once approved, a copy of the security plan shall be maintained with the Police Department, Vice Detail and the Planning Department. Any amendments to the plan shall be approved by the Chief of Police or his/her designee and shall also be filed with the Police Department, Vice Detail and the Planning Department. Security measures shall be reviewed and discussed with the Chief of Police or his/her designee by the business and property owners on an ongoing basis.

Planning
Police
Conditions of Approval for
CUP 4078 - Anaheim GardenWalk Project
D-20
NO. CONDITIONS OF APPROVAL REVIEW BY

85. Within sixty (60) days of the approval of Conditional Use Permit No. 4078E, the property owner or his/her designee shall submit an updated Parking Maintenance and Operation Plan as required by Mitigation Monitoring Program No. 004a. In addition to review and approval by the Planning Department, the plan shall also be submitted for review and approval by the Chief of Police or his/her designee. The plan shall promote a safe environment for the circulation of persons and vehicles, and the prevention of crime in the parking facilities. This plan shall include measures to ensure reasonable egress times for vehicles out of the parking lot. Any amendments to the plan shall be filed with the Police Department, Vice Detail and the Planning Department.

Planning
Police

86. Following the issuance of a Certificate of Occupancy for both hotels in Area A, project ownership will implement a valet program during peak demand periods that will create sufficient additional parking supply to satisfy such demand. The valet program shall be implemented in accordance with the Parking Maintenance and Operations Plan.

Planning
E-1
MODIFIED MITIGATION MONITORING PROGRAM NO. 004a
Project : Anaheim GardenWalk
Project Actions: June 1999
General Plan Amendment No. 359
Amendment No. 4 to The Disneyland Resort Specific Plan No. 92-1 Conditional Use Permit No. 4078
Amendment No. 2 to the Anaheim Resort Public Realm Landscape Program Development Agreement No. 99-01 between the City of Anaheim and Pointe*Anaheim, LLC
February 2002
General Plan Amendment No. 2001-00393
Amendment No. 5 to The Disneyland Resort Specific Plan No. 92-1 Amendment No 1 to Conditional Use Permit No. 4078
Amendment No. 3 to the Anaheim Resort Public Realm Landscape Program First Amended and Restated Development Agreement No 99 1 between the City of Anaheim and Excel Pointe Anaheim, LLC
Disposition and Development Agreement by and between the City of Anaheim and Excel Pointe Anaheim LLC
December 2004
Amendment No. 2 to Conditional Use Permit No. 4078
Amendment No. 1 to First Amended and Restated Development Agreement No. 99-01 between the City of Anaheim and Anaheim GW, LLC
Amendment No. 1 to Disposition and Development Agreement by and between the City of Anaheim and Anaheim GW, LLC
January 2006
Amendment No. 2 to First Amended and Restated Development Agreement No. 99-01 between the City of Anaheim and Anaheim GW, LLC
Amendment No. 2 to Disposition and Development Agreement by and between the City of Anaheim and Anaheim GW, LLC
April 2006
General Plan Amendment No. 2005-00440
Amendment No. 6 to The Disneyland Resort Specific Plan No. 92-1 Amendment No. 3 to Conditional Use Permit No. 4078
Second Amended and Restated Development Agreement No. 99-01 between the City of Anaheim and Anaheim GW, LLC
First Amendment and Restated Disposition and Development Agreement By and Between Anaheim GW, LLC and City of Anaheim
Tentative Parcel Map No. 2002-205
Final Site Plan No. 2006-00002
April 2007
Amendment No. 7 to The Disneyland Resort Specific Plan No. 92-1 March 2010
Amendment No. 1 to the Second Amended and Restated Development Agreement No. 99- 01 by and between the City of Anaheim and Anaheim GW, LLC; GardenWalk Hotel 1, LLC; and Westgate Resorts Anaheim, LLC
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-2
This Modified Mitigation Monitoring Program includes those mitigation measures applicable to this project from Modified Mitigation Monitoring Program No. 0067 for The Disneyland Resort Specific Plan (EIR No. 311) and additional mitigation measures as identified in the Mitigated Negative Declaration approved in conjunction with the Pointe*Anaheim Project (renamed the Anaheim GardenWalk project) and Addendum No. 1 approved on February 26, 2002, Addendum No. 2 approved on April 11, 2006, Addendum No. 3 approved on August 16, 2011, and Addendum No. 4 approved on May14, 2013 in conjunction with the abovelisted project actions modifying the project.

Terms and Definitions:

1. Property Owner/Developer – Anaheim GW, LLC

2. Project Design Features (PDF's) - Measures incorporated into the Pointe Anaheim Project (renamed Anaheim GardenWalk Project) by the property owner/developer with the intent of minimizing potential environmental impacts. The project design features included in this Mitigation Monitoring Program will be implemented as mitigation measures.

3. Environmental Equivalent/Timing - Any project design feature or mitigation measure and timing thereof, subject to the approval of the City, which will have the same or superior result and will have the same or superior effect on the environment. The Planning Department, in conjunction with any appropriate agencies or City departments, shall determine the adequacy of any proposed "environmental equivalent/timing" and, if determined necessary, may refer said determination to the Planning Commission. Any costs associated with information required in order to make a determination of environmental equivalency/timing shall be borne by the property owner/developer. Staff time for reviews will be charged on a time and materials basis at the rate in the City's adopted Fee Schedule.

4. Timing - This is the point where a mitigation measure/project design feature must be monitored for compliance. In the case where multiple action items are indicated, it is the first point where compliance associated with the mitigation measure/project design feature must be monitored. Once the initial action item has been complied with, no additional monitoring pursuant to the Mitigation Monitoring Program will occur, as routine City practices and procedures will ensure that the intent of the measure/project design feature has been complied with. For example, if the timing is, "to be shown on approved building plans" subsequent to issuance of the building permit consistent with the approved plans will be final building and zoning inspections pursuant to the building permit to ensure compliance.

East of Harbor Boulevard, South of Disney Way, West of Clementine Street and North of Katella Avenue within District A/Pointe Anaheim Overlay (renamed Anaheim GardenWalk Overlay) and Portion of Parking District (East Parking Area)/C-R Overlay and Pointe Anaheim Overlay (renamed Anaheim GardenWalk Overlay) of The Disneyland Resort Specific Plan
Location:

August 2010
Amendment No. 2 to the Second Amended and Restated Development Agreement No. 99- 01 by and between the City of Anaheim and GardenWalk Hotel 1, LLC August 2011
General Plan Amendment No. 2010-00481
Amendment No. 8 to The Disneyland Resort Specific Plan No. 92-1 Amendment No. 4 to Conditional Use Permit No. 4078
Amendment No. 3 to the Second Amended and Restated Development Agreement No. 99- 01 between the City of Anaheim and Katella Anaheim Retail, LLC Amendment No. 1 to Final Site Plan No. 2006-00002
May 2013
Amendment No. 4 to the Second Amended and Restated Development Agreement No. 99- 01 between the City of Anaheim and GardenWalk Hotel 1, LLC Other related actions to implement Anaheim GardenWalk project Project Actions
Continued:

Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-3

5. Responsibility for Monitoring - Shall mean that compliance with the subject mitigation measure(s) shall be reviewed and determined adequate by all departments listed for each mitigation measure. Outside public agency review is limited to those public agencies specified in the Mitigation Monitoring Program which have permit authority in conjunction with the mitigation measure.

6. Ongoing Mitigation Measures - The mitigation measures that are designated to occur on an ongoing basis as part of this Mitigation Monitoring Program will be monitored in the form of an annual letter from the property owner/developer in January of each year demonstrating how compliance with the subject measure(s) has been achieved. When compliance with a mitigation measure/project design feature has been demonstrated for a period of one year, monitoring of the mitigation measure/project design feature will be deemed to be satisfied and no further monitoring will occur. For mitigation measures/project design features that are to be monitored "Ongoing During Construction", the annual letter will review those mitigation measures/project design features only while construction is occurring; monitoring will be discontinued after construction is complete. A final annual letter will be provided at the close of construction.

1. Building Permit - For purposes of this Mitigation Monitoring Program, a building permit shall be defined as any permit issued for construction of a new building or structural expansion or modification of any existing building, but shall not include any permits required for interior tenant improvements or minor additions to an existing structure or building.

8. Applicability – Each Mitigation Measure and Project Design Feature applies to development within Area A and Area B (as described in the Addendum to the Pointe Anaheim Initial Study/Mitigated Negative Declaration, Anaheim GardenWalk Project, dated June 6, 2011, in accordance with the timing stated in the measure, unless stated otherwise in the measure.

NO. Measure REVIEW BY

3.1-1 Prior to approval of the Final Site Plan, plans (including, but not limited to, a site plan, conceptual elevations, conceptual landscape plans and signage plans) shall be submitted by the property owner/developer and will be reviewed for consistency with The Disneyland Resort Specific Plan.

Planning Department,
Planning Services
Division

3.2-1 Prior to approval of the Final Site Plan, the property owner/developer shall submit plans detailing the setbacks for the parking structures and landscaping plans which minimize compatibility impacts of the parking facilities on surrounding areas, consistent with Section 5.8 of The Disneyland Resort Specific Plan.

Planning Department,
Planning Services
Division

3.2-2 Prior to issuance of each hotel building permit, a pre-project study of radio transmission from the AM 1500 Highway Advisory Radio Transmission Tower located on the Fire Station No. 3 site shall be conducted by the property owner/developer to determine baseline conditions for the entire Anaheim GardenWalk Overlay. Six months after topping out or any earlier time as determined necessary by the City of Anaheim, a follow-up study of radio tower transmissions shall be undertaken immediately by the property owner/developer. If the City of Anaheim determines that the proposed project creates a significant impact on radio
transmission, a signal booster relay system, tower relocation, or other solution as approved by the City of Anaheim shall be implemented by the property owner/developer as soon as
practicable.

Planning Department,
Planning Services
Division

3.3-1 Prior to issuance of each building permit, appropriate traffic signal assessment fees shall be paid by the property owner/developer to the City of Anaheim in amounts determined by the City Council Resolution in effect at the time of issuance of the building permit or credit given for City-authorized improvements.

Planning Department,
Building Division;
Public Works
Department, Traffic
and Transportation
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-4
NO. Measure REVIEW BY

3.3-2 Prior to approval of the first final subdivision map or issuance of the first building permit, whichever occurs first, in Area A and in Area B, the property owner/developer shall irrevocably offer for dedication (with subordination of easements), including necessary construction easements, the ultimate rights-of-way (as indicated in the General Plan Circulation Element) for the following arterial highway/street half-sections on or adjacent to parcels under its ownership or control to the City of Anaheim:

Planning Department,
Planning Services
Division;
Public Works
Department,
Development
Services Division
Area A
a. Katella Avenue (to ultimate 8-lane facility)
b. Disney Way, along the frontage of Area A
c. Clementine Street
Area B
a. Harbor Boulevard
b. Disney Way, along the frontage of Area B

3.3-3 Within 120 days of acquiring properties adjacent to arterial highways/street intersection half sections, if, after the initial dedications, any additional parcels are acquired by the property owner/developer adjacent to the arterial highway/street intersection half-sections included in MM 3.3-2 of Modified Mitigation Monitoring Program No. 004, the property
owner/developer shall notify the City in writing of said acquisition and the ultimate rights-of-way for said properties shall be irrevocably offered for dedication to the City of Anaheim.

Planning Department,
Planning Services
Division;
Public Works
Department,
Development
Services Division

3.3-4 Prior to approval of the first grading plan in Area A; implemented prior to first final building and zoning inspection in Area A, a phasing plan shall be submitted for review and approval to the City Engineer demonstrating how the following improvements, as approved by the City Engineer, will be constructed by the property owner/developer:

Public Works
Department, Traffic
and Transportation
Division
a. Clementine Street/Anaheim GardenWalk driveway
intersection; and
b. Clementine Street between Disney Way and Katella Avenue (including the median).

3.3-5 Prior to issuance of each building permit, appropriate traffic impact and improvement fees shall be paid by the property
owner/developer to the City of Anaheim in amounts determined by the City Council Resolution in effect at the time of issuance of the building permit with credit given for City-authorized improvements provided by the property owner/developer; and, participate in all applicable reimbursement or benefit districts which have been established.

Planning Department,
Building Division;
Public Works
Department, Traffic
and Transportation
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-5
NO. Measure REVIEW BY

3.3-6 To be shown on street improvement plans; and to be implemented prior to final building and zoning inspection for the parking structure, access roads leading up to the parking facilities shall be sized to accommodate traffic at peak hours, thereby substantially reducing the likelihood of backups onto City streets and freeway ramps.

Public Works
Department, Design
Division

3.3-7 Prior to issuance of the first building permit in Area A,the property owner/developer shall fully fund the implementation of the SCOOT System at the Haster Street/Katella Avenue intersection and along the Harbor Boulevard, Katella Avenue, Disney Way, and
Clementine Street corridors in the Anaheim Resort area. The specific improvements to be implemented are identified in Table

4.3-8 which follows (in the Pointe Anaheim IS/MND). Property owner/developer shall also fund the installation of SCOOT loop detectors at all 16 locations as well as the installation of new traffic signal controllers and cabinets at the eight locations identified in Table 4.3-8, which will also include signal preemption for fire response vehicles. Implementation will be to the satisfaction of the City Engineer. Pavement repair, if needed to provide additional conduit, will be provided by the property owner/developer to the satisfaction of the City Engineer. If, however, any or all of the above mentioned improvements have been implemented prior to the time that the property owner/developer implements the project, the City Engineer may instead require that the property owner/developer pay an equal amount of funding to be used towards an alternative traffic improvement in the immediate area that will benefit traffic movement in the Anaheim Resort Area.

TABLE 4.3-8
Public Works
Department, Traffic
and Transportation
Division

LOCATIONS FOR IMPLEMENTATION OF

SCOOT SIGNAL SYSTEM UPGRADE MITIGATION MEASURE
Install SCOOT
Intersection Loop Detectors
Ball & Harbor X
Harbor & I-5 NB Ramps X
Harbor & I-5 SB Ramps X
Harbor & Manchester X
Harbor & Esplanade X
Harbor & Disney Way X
Harbor & Katella X
Katella & Clementine X
Katella & Haster X
Katella & I-5 SB Ramps X
Katella & I-5 NB Ramps X
Katella & Lewis X
Clementine & Disney Way X
Disney Way & I-5 SB Ramps X
Disney Way & Anaheim Boulevard X
Disney Way & Anaheim GardenWalk Access X
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-6
NO. Measure REVIEW BY

3.3-8 Prior to the first final building and zoning inspection the property owner/developer shall provide proof of participation in the Anaheim Transportation Network (ATN). On-going during Project operations:

Public Works
Department, Traffic
and Transportation
Division
a. Every property owner and/or lessee shall be a voting member of the ATN, subject to the terms and provisions of the by-laws and association rules of the ATN.
b. Every property owner and/or lessee shall participate in ATN coordinated transportation demand management efforts
designed to decrease traffic congestion and increase
ridesharing.
c. Every property owner and/or lessee shall financially participate in the operation of a clean fuel shuttle system, if established. d. Every property owner and/or lessee shall designate an on-site contact who will be responsible for coordinating with the ATN and implementing all trip mitigation measures. The
requirements of the mitigation measure will be included in the lease or other agreement with all of the project participants.

Documentation indicating compliance with this mitigation measure will be included in the annual monitoring report ongoing during project operation.

3.3-9 Prior to approval of each Final Site Plan encompassing a parking facility, a Parking Structure Layout and Signing Plan
demonstrating a layout of required parking spaces and signage shall be provided to the Planning Department, Planning Services Division, for review and approval.

Planning Department,
Planning Services
Division

3.3-10 Prior to the first final building and zoning inspection in Area A and in Area B; and on-going during Project operations, with verification by participating lessees, the property owner/developer will implement and administer a comprehensive Transportation Demand Management (TDM) program for all employees.

Objectives of the TDM program shall be to increase ridesharing and use of alternative transportation modes by guests and provide a menu of commute alternatives for employees to reduce projectgenerated trips.

Public Works
Department, Traffic
and Transportation
Division
A menu of TDM program strategies and elements for future employee commute options include, but are not limited to, the following:
a. Onsite Service. Onsite services, such as food, retail, and other services be provided.
b. Ridesharing. A computer listing of all employee members be developed for the purpose of providing a “matching” of
employees with other employees who live in the same
geographic areas and who could rideshare.
c. Vanpooling. A computer listing of all employees for the purpose of matching numbers of employees who live in
geographic proximity to one another and could comprise a vanpool.

Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-7
NO. Measure REVIEW BY
d. Transit Pass. Southern California Rapid Transit District and Orange County Transportation Authority (including commuter rail) passes be promoted through financial assistance and onsite sales to encourage employees to use the various
transit and bus services from throughout the region.
e. Commuter Bus. As commuter “express” bus service expands throughout the region, passes for use on these lines may be provided for employees who choose to use this service.

Financial incentives be provided.
f. Shuttle Service. A computer listing of all employees living in proximity to the project be generated, and a local shuttle program offered to encourage employees to travel to work by means other than the automobile.
g. Bicycling. A Bicycling Program be developed to offer a bicycling alternative to employees. Secure bicycle racks, lockers, and showers be provided as part of this program.

Maps of bicycle routes throughout the area be provided to inform potential bicyclists of these options.
h. Rental Car Fleet. A “fleet vehicle” program be developed to provide employees who travel to work by means other than an automobile with access to automobiles in case of
emergency, medical appointments, etc. This service would help employees use alternative modes of transportation by ensuring that they would be able to have personal
transportation in the event of special circumstances.
i. Guaranteed Ride Home Program. A program to provide
employees who rideshare, or use transit or other means of commuting to work, with a prearranged ride home in a taxi, rental car, shuttle, or other vehicle, in the event of
emergencies during the work shift.
j. Target Reduction of Longest Commute Trip. An incentive program for ridesharing and other alternative transportation modes to put highest priority on reduction of longest
employee commute trips.
k. Stagger shifts.
l. Develop a “compressed work week” program, which provides for fewer work days but longer daily shifts as an option for employees.
m. Explore the possibility of a “telecommuting” program that would link some employees via electronic means (e.g.,
computer with modem).
n. Develop a parking management program that provides
incentives to those who rideshare or use transit means other than single-occupant auto to travel to work.
o. Access. Preferential access to high occupancy vehicles and shuttles may be provided.
p. Financial Incentive for Ridesharing and/or Public Transit. (Currently, Federal law provides tax-free status for up to $60 Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-8
NO. Measure REVIEW BY
per month per employee contributions to employees who
vanpool or use public transit including commuter rail and/or express bus pools).
q. Financial Incentive for Bicycling. Employees offered financial incentives for bicycling to work.
r. Special “Premium” for the Participation and Promotion of Trip Reduction. Ticket/passes to special events, vacations, etc. be offered to employees who recruit other employees for
vanpool, carpool, or other trip reduction programs.
s. Actively recruit prospective employees residing within a 30- minute commute shed.
t. Design incentive programs for carpooling and other
alternative transportation modes so as to put highest priority on reduction of longest commute trips.

Every property owner and/or lessee shall designate an on-site contact who will be responsible for coordinating with the ATN and implementing all trip mitigation measures with an on-site coordinator. The on-site coordinator will be the one point of contact representing the project with the ATN. The requirements of the mitigation measure will be included in the lease or other agreement with all of the project participants. Documentation indicating compliance with this mitigation measure will be included in the annual monitoring report ongoing during project operation.

3.3-11 Prior to the first final building and zoning inspection in Area A and in Area B; and implementation on-going during Project operations, the property owner/developer will provide a Parking Maintenance and Operation Plan to the Planning Department, Planning Services Division, for review and approval; and said Plan shall be implemented on an on-going basis during Project operation.

Planning Department,
Planning Services
Division

3.3-12 Prior to approval of the first Final Site Plan for Area A, the parking facility serving development within Area A shall be designed to provide striped parking spaces for 3,076 cars and 15 bus spaces.

Prior to approval of the Final Site Plan for the last hotel in Area A, the remaining 124 parking spaces shall be provided in Area A.

Prior to approval of the Final Site Plan for Area B, parking facilities serving Area B shall be shown on the Final Site Plan and designed to accommodate 1,600 cars for a total of 4,800 parking spaces for the full build-out of the Anaheim GardenWalk project.

Planning Department,
Planning Services
Division

3.3-13 Deleted intentionally February 26, 2002. Updated parking demand would be accommodated without the need for flex parking.

N/a
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-9
NO. Measure REVIEW BY

3.3-14 Upon commencement of any activity/uses authorized by Public Works Conditional Use Permit No. 4078 as amended; and on-going Department, Traffic during Project operations, if reasonably needed in order to and Transportation regulate the flow of pedestrian traffic to the project, as determined Division by the City’s Traffic and Transportation Manager , the property owner/developer shall pay all costs associated with providing one or more pedestrian crossing officers at Harbor Boulevard and Disney Way, in order to facilitate the flow of pedestrians during the “Peak Period,” which is defined as the time period from 5:00 p.m. to 9:00 p.m. during the following seasonal peaks: the Memorial Day weekend through the Labor Day weekend; the week prior to, during and following Christmas week; Easter weeks (one week before and one week after); and at any other time determined to be necessary by the City’s Traffic and Transportation Manager.

The continued need for this officer(s) will be reviewed by the City’s Traffic and Transportation Manager at least once annually, and the days and/or hours of pedestrian crossing officer staffing shall be adjusted, when determined necessary by the City’s Traffic and Transportation Manager.

3.3-15 Prior to the first final building and zoning inspection in Area A, the Public Works property owner/developer shall submit to the City’s Traffic and Department, Traffic Transportation Manager for review and approval, a program for and Transportation coordinating traffic signal timing in the area (within the limits of the Division SCOOT signal upgrades) which shall thereafter be implemented by the property owner/developer. In addition, the property owner/developer shall submit to the City’s Traffic and
Transportation Manager for review and approval, a study assessing the benefits of restricting, during certain peak exiting times, pedestrian crossings on the crosswalk located on the north side of the intersection of Harbor Boulevard and Disney Way to improve the circulation of vehicular traffic by causing all east-west crossing pedestrian traffic to occur on the south side of such intersection where pedestrian crossings will not slow the east to north turning movement of cars exiting The Disneyland Resort.

3.3-16 On-going during Project operations, if such restricted pedestrian Public Works movement (refer to MM 3.3-15) is determined to be necessary by Department, Traffic the City’s Traffic and Transportation Manager, the property and Transportation owner/developer shall pay all costs associated with the design Division and implementation of such restricted crosswalk for this intersection to the satisfaction of the City Engineer, within the timeframe established by the City Engineer.

3.4-1 Prior to each final building and zoning inspection, the property owner/developer shall comply with all SCAQMD offset regulations and implementation of Best Available Control Technology (BACT) for all permitted new and modified stationary sources. Copies of permits shall be given to the Planning Department.

South Coast Air
Quality Management
District;
Planning Department,
Planning Services
Division

3.4-2 On-going during Project operations, the property owner/developer Public Works shall schedule goods movements for off-peak traffic hours to Department, Traffic reduce emissions to the extent practicable. and Transportation Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-10
NO. Measure REVIEW BY

3.4-3 Prior to issuance of each building permit, the property owner/developer shall submit evidence that low emission paints and coatings are utilized in the design and construction of buildings in compliance with AQMD regulations. This information shall be denoted on the project plans and specifications.

South Coast Air
Quality Management
District;
Planning Department,
Building Division

3.4-4 Prior to issuance of each building permit, the project design will incorporate the following energy-saving features which will also contribute to reduced emissions:
a. Improved thermal integrity of structures and reduced thermal load through use of automated time clocks or occupant
sensors.
b. Efficient heating and other appliances.
c. Incorporation of appropriate passive solar design.
d. Proper sealing of buildings.

Public Utilities
Department, Electric
Services
Administration,
Resource Efficiency

3.4-5 On-going during Project operations, the property owner/developer shall participate in marketing programs which promote The Anaheim Resort area as a Vacation Destination to encourage use of facilities within the area rather than taking cars to destinations off-site. This will be demonstrated through documentation in the MMRP Annual Report of the various marketing programs in which the Anaheim GardenWalk participated during the year.

Public Works
Department, Traffic
and Transportation
Division

3.5-1 On-going during project operations, the property owner/developer shall ensure that noise from areas which involve live amplified music and/or open-air festival events, do not exceed the noise levels established by Chapter 6.70 (Sound Pressure Levels) of the Anaheim Municipal Code.

Planning Department,
Building Division and
Code Enforcement
Division

3.5-2 Prior to commencement of amplified music or the generation of noise from open-air festival events, within nine months from the commencement of said noise generating activities and on-going during project operations, a Noise Monitoring Program prepared by a certified acoustical engineer shall be submitted to the Planning Department, Planning Services Division, for review and approval for any component of Anaheim GardenWalk that has the potential to involve amplified music or noise from open-air festival events and, within nine months of commencement of said activity, the property owner/developer shall submit the results of the Noise Monitoring Program conducted by a certified acoustical engineer to ensure that there are no violations of Chapter 6.70 (Sound Pressure Levels) from the Anaheim GardenWalk activity outside the Project. If noise in excess of Chapter 6.70 (Sound Pressure Levels) is detected, the property owner/developer shall modify operations immediately to bring the noise-generating activity into conformance with Chapter 6.70.

Planning Department,
Planning Services
Division and Building
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-11
NO. Measure REVIEW BY

3.6-1 Prior to approval of each grading plan, the property Public Works owner/developer shall submit a thorough soils and geological Department, report for the area to be graded, based on proposed grading and Development prepared by an engineering geologist and geotechnical engineer. Services Division The report shall comply with Title 17 of the Anaheim Municipal Code.

3.6-2 Prior to issuance of each building permit, the property owner/developer shall submit for review and approval detailed foundation design information for the subject buildings, prepared by a civil engineer, based on recommendations by a geotechnical engineer.

Planning Department,
Building Division

3.6-3 Prior to issuance of each foundation permit, the property owner/developer shall submit a report prepared by a geotechnical engineer for review and approval which shall investigate the subject foundation excavations to determine if soft layers are present immediately beneath the footing site and to ensure that compressibility does not underlie the footing.

Planning Department,
Building Division

3.6-4 Prior to issuance of each building permit, the property owner/developer shall submit plans showing that the proposed structure has been analyzed for earthquake loading and designed according to the most recent seismic standards in the Uniform Building Code adopted by the City of Anaheim.

Planning Department,
Building Division

3.7-1 Prior to approval of a grading plan; and implementation during Project construction and operation, the property owner/developer shall submit a Master Drainage and Runoff Management Plan (MDRMP) for review and approval and pay the required South Central Area Master Plan of Drainage (SCAMPD) storm drain fees. The Master Plan shall include, but not be limited to, the following items:

Public Works
Department,
Development
Services Division;
Regional Water
Quality Control
Board;
a. Backbone storm drain layout and pipe size, including supporting hydrology and hydraulic calculations for storms up to and including the 100-year storm.

Orange County Flood
Control District
b. A delineation of the improvements to be implemented for control of project-generated drainage and runoff.
c. Detailed assessment of existing water quality, potential water quality impacts, and a description of proposed measures to maintain water quality to the extent required by the National Pollutant Discharge Elimination System (NPDES) and its
regulations, including the following:
(1) Incorporation of structural and nonstructural Citycontrolled Best Management Practices (BMPs). BMPs shall, to the extent permitted by law, include, but are not limited to, containment of masonry and paint wastes on
the construction site; proper disposal of vehicle fuel and maintenance wastes; disposal of trash and debris;
prohibiting water wash down of paved areas (both during and after construction unless allowed by the NPDES
permit); and education/training for construction workers on these practices. Engineering details, maintenance
procedures, and funding responsibilities of these BMPs
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-12
NO. Measure REVIEW BY
shall also be described.
(2) Incorporation of measures to comply with applicable actions to be identified by the RWQCB in conformance
with the State Water Resources Control Board (SWRCB)
statewide water quality control plan for inland surface waters, adopted April 11, 1991.
(3) Description of a water quality monitoring program to monitor water quality during and subsequent to
construction and to evaluate the effectiveness of BMPs.

The water quality monitoring program shall identify: (1) the person/agency responsible for implementing the
program, (2) sources of pollutants in runoff (e.g.,
nuisance flows from development areas, irrigation flows), (3) specific types of pollutants expected in runoff that will be monitored (e.g., total suspended solids, phosphorous, lead), (4) water quality sampling stations that are
representative of runoff from the sources identified
above, (5) sampling program methodology, including
devices to be used and frequency and duration of
sampling, (6) method for evaluating data collected from a sampling program, including threshold standards for
determining effectiveness of BMPs, and (7) additional
measures, if necessary, to increase the effectiveness of the BMPs to the threshold standards identified in C(1)
above.

Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-13
NO. Measure REVIEW BY

3.7-2 Prior to issuance of each building permit, the property owner/developer shall submit landscaping and irrigation plans and an Irrigation Management Program. This landscape plan shall include a maintenance program to control the use of fertilizers and pesticides, and an irrigation system designed to minimize surface runoff and overwatering. Additionally:
a. The landscape plans shall be prepared and certified by a licensed landscape architect. The landscape architect shall submit plans in accordance with Anaheim's Landscape Water Efficiency Ordinance and Guidelines.
b. The Irrigation Management Program shall specify methods for monitoring the irrigation system and shall be designed by an irrigation engineer (plans to be submitted in accordance with the Specific Plan). The system shall ensure that irrigation rates do not exceed the infiltration of local soils and that the application of fertilizers and pesticides do not exceed appropriate levels of frequencies.

Public Utilities
Department, Electric
Services
Administration,
Resource Efficiency;
Community Services
Department, Parks
Division;
Planning Department,
Planning Services
Division
c. The landscape and irrigation plans shall be developed to be consistent with the provisions of the Specific Plan, which require that the maximum annual water allowance for the project not exceed 80 percent of the mean annual
evapotranspiration, or that the landscape irrigation system include water-conserving features such as low-flow irrigation heads, automatic irrigation scheduling equipment, flow
sensing controls, rain sensors, soil moisture sensors, and other water-conserving equipment. In addition, all irrigation systems shall be designed so that they will function properly with reclaimed water, if it should become available.

3.7-3 On-going during Project operations, the property owner/developer Public Works shall provide for the following: cleaning of all paved areas not Department, Streets maintained by the City of Anaheim including, but not limited to, and Sanitation private streets and parking lots on not less than a monthly basis. Division Using water to clean streets, parking lots, and other areas shall be allowed on a periodic basis if allowed in the applicant's NPDES permit. Nightly washdown shall be allowed where advisable to maintain safe and sanitary working conditions, if allowed in the property owner/developer's and City's NPDES permit. Flushing debris, residue, and sediment down the storm drains shall conform to the property owner/developer's NPDES requirements.

Property owner/developer agrees that material deposited in City storm drains shall not be in violation of the City's NPDES permit.

3.7-4 Prior to each final building and zoning inspection, the property owner/developer shall submit a letter from a landscape architect stating that landscape materials and irrigation systems have been installed as specified in the approved landscaping and irrigation plans. Any modifications to the landscape plan shall be specifically approved by the Planning Department.

Planning Department,
Planning Services
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-14
NO. Measure REVIEW BY

3.7-5 To be installed with Project water mains and to be connected if Public Utilities reclaimed water becomes available, to reduce the project’s Department, Water demand on potable water, the property owner/developer shall Services install water lines on-site so that reclaimed water may be used for Administration landscape irrigation and other purposes.

3.8-1 Prior to issuance of each grading permit (for Import/Export Plan) Public Works and prior to issuance of each demolition permit (for Demolition Department, Traffic Plan) for Area B, The property owner/developer shall submit and Transportation Demolition and Import/Export Plans. The plans shall include Division identification of offsite locations for material export from the project and options for disposal of excess material. These options may include recycling of materials onsite, sale to a soil broker or contractor, sale to a project in the vicinity or transport to an environmentally cleared landfill, with attempts made to move it within Orange County. The property owner/developer shall be encouraged to offer recyclable building materials, such as asphalt or concrete for sale or removal by private firms or public agencies for use in construction of other projects, if not all can be reused on the project site.

3.8-2. Prior to approval of a grading plan or issuance of a demolition or building permit; whichever occurs first, the property
owner/developer shall submit a Traffic Mitigation and Construction Phasing and Control Plan. The Traffic Mitigation, Construction Phasing and Control Plan shall identify the following:
a. A Construction Staging Area Plan showing the location and size of the construction staging area. The Plan shall also show how the staging area will be screened from view in
compliance with the City of Anaheim Municipal Code.
b. A Construction Barrier Plan showing the location and types of barriers that will be in place during grading and construction shall be submitted. Said plan shall provide for all construction areas to be screened from view, in compliance with the City of Anaheim Municipal Code and shall include provision for the type and height of the barriers to be placed along all
construction perimeters prior to the commencement of
demolition, site preparation, or grading, whichever occurs first.

Public Works
Department, Traffic
and Transportation
Division;
Planning Department,
Planning Services
Division
Planning Department,
Community
Preservation Division
c. A Truck Route Plan identifying truck routes along arterials, avoiding residential areas to the extent feasible and in compliance with Chapter 6.70 (Sound Pressure Levels). The Plan shall show conformance with the external noise limits for construction between 7 p.m. and 7 a.m. The Plan shall also prohibit construction traffic on residential streets where improvements are not planned and shall provide measures to ensure that truck drivers are directed away from residential streets and travel on approved routes only. Measures to assist in guiding truck movement on the arterial roadway system include, but are not limited to, provision of truck route maps to truck drivers and placement of flag persons and construction signage at appropriate locations. The Truck Route Plan shall provide for monitoring of street conditions and potential repairing and/or re-paving by property owner/developer after Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-15
NO. Measure REVIEW BY
completion of construction as required by the City Engineer.

This plan shall be adhered to throughout the project
construction period.
d. A Construction Traffic Management Plan which includes mechanisms to reduce construction-related traffic congestion which shall be implemented during grading and construction, including, but not limited to, the following:
(1) Configure construction parking to minimize onsite and offsite traffic interference.
(2) Minimize obstruction of through-traffic lanes.
(3) Provide flag persons to guide traffic, as determined in the plan.
(4) Coordinate scheduling with other infrastructure
improvements to allow them to be facilitated efficiently during roadway improvements, such as sewer, storm
drain, and water line improvements.
(5) Outline procedures for any required traffic detours during construction, including provision of tour bus stops.
(6) Phase each roadway improvement to allow access to all existing businesses. In some instances, this will require lane-by-lane renovation, temporary bypass roads, or
traffic reroutes.
(7) Employ vertical shoring as often as possible. This will minimize the amount of road surface that will be
disturbed at a given location.
(8) Sequence the construction of each roadway
improvement to minimize disruption to residents and
businesses. The property owner/developer shall
coordinate with the Convention Center and area hotels to ensure continued operations of these facilities, as well as the continued operation of the existing Disneyland theme park and Disneyland Hotel.
(9) Establish off-site parking and staging areas, where practical and possible, to minimize the impact to existing level of service on adjacent roadways. These off-site
parking and staging areas will allow a dispersion of traffic flow to non-critical areas and will encourage bussing of construction workers from the off-site areas to the
construction sites.
e. A Trip Reduction Plan for construction crew vehicles shall be prepared to reduce potential vehicle trips on the road and identify parking locations for construction employees and equipment for each project component that exceeds 100
construction employees.

Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-16
NO. Measure REVIEW BY

3.8-3 On-going during construction, the property owner/developer shall Public Works submit a monthly update report showing construction activities for Department, Traffic the upcoming month which shall include traffic mitigation and and Transportation control planning and construction scheduling. Division

3.8-4 Intentionally deleted. Redundant with above measure N/a

3.8-5 On-going during construction, if Anaheim Police Department or Anaheim TMC personnel are required to provide temporary traffic control services, the property owner/developer shall reimburse the City, on a fair share basis, if applicable, for reasonable costs associated with such services.

Police Department;
Public Works
Department, Traffic
and Transportation
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-17
NO. Measure REVIEW BY

3.8-6 On-going during construction, the following measures will be followed by the property owner/developer to reduce air quality impacts:
a. Normal wetting procedures or other dust palliative measures shall be followed during earth-moving operations to minimize fugitive dust emissions, in compliance with the City of Anaheim Municipal Code.

Planning Department,
Building Division;
Public Works
Department,
Development
Services Division
b. Roadways adjacent to the project shall be swept and cleared of any spilled export material at least twice a day to assist in minimizing fugitive dust; haul routes shall be cleared as needed if spills of material exported from the project site occur.
c. Where practicable, heavy duty construction equipment shall be kept onsite when not in operation to minimize exhaust emissions associated with vehicles repetitiously entering and exiting the project site.
d. Trucks importing or exporting soil material and/or debris shall either be covered prior to entering public streets, or shall comply with the vehicle freeboard requirements of Section 23114 of the California Vehicle Code for both public and private roads. This California Vehicle Code section stipulates that the load, where it contacts the sides, front and back of the cargo area, remain six inches from the upper edge of the container area, and that the load does not extend, at its peak, above any part of the upper edge of the cargo container area. e. Manually irrigate or activate irrigation systems necessary to water and maintain the vegetation as soon as planting is completed.
f. Reduce traffic speeds on all unpaved road surfaces to 15 miles per hour or less.
g. Suspend all grading operations when wind speeds (as
instantaneous gust) exceed 25 miles per hour and during second stage smog alerts.
h. The project will comply with the SCAQMD Rule 402, which states that no dust impacts offsite are sufficient to be called a nuisance, and SCAQMD Rule 403, which restricts visible
emissions from construction.
i. Use low emission mobile construction equipment (e.g., tractors, scrapers, dozers, etc.) where practicable.
j. Utilize existing power sources (e.g., power poles) or clean-fuel generators rather than temporary power generators, where practicable.
k. Maintain construction equipment engines by keeping them properly tuned.
l. Use low sulfur fuel for equipment, to the extent practicable.

Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-18
NO. Measure REVIEW BY

3.8-7 On-going during construction, the property owner/developer shall implement the following to limit emissions from architectural coatings and asphalt usage:
a. Use non-solvent-based coatings on buildings, wherever appropriate.
b. Use solvent-based coatings, where they are necessary, in ways that minimize solvent emissions.
c. Encourage use of high-solid or water-based coatings.

Air Quality
Management District;
Planning Department,
Building Division

3.8-8 On-going during construction, all construction contractors shall comply with SCAQMD regulations, including Rule 402 which specifies that no there be no dust impacts offsite sufficient to cause a nuisance, and SCAQMD Rule 403, which restricts visible emissions from construction. Rule 403 was amended by the SCAQMD after preparation of The Disneyland Resort EIR No. 311. Specific measures contained in the rule to reduce fugitive dust include the following:
a. Apply chemical stabilizers to disturbed surface areas (completed grading areas) within five days of completing grading or apply dust suppressants or vegetation sufficient to maintain a stabilized surface.
b. For open storage piles, apply water hourly or cover with temporary coverings.
c. Water exposed surfaces at least twice a day under calm conditions and as often as needed on windy days when winds are less than 25 miles per day or during very dry weather in order to maintain a surface crust and prevent the release of visible emissions from the construction site.
d. Wash mud-covered tires and under-carriages of trucks leaving construction sites.
e. Provide for street sweeping, as needed, on adjacent roadways to remove dirt dropped by construction vehicles or mud which would otherwise be carried off by trucks departing project sites.

Air Quality
Management District;
Planning Department,
Building Division

3.8-9 On-going during demolition and construction, construction noise shall be limited by the property owner/developer to 60 dBA along the property boundaries before 7:00 a.m. and after 7:00 p.m. as governed by Chapter 6.70 (Sound Pressure Levels) of the Anaheim Municipal Code.

Planning Department,
Building Division and
Code Enforcement
Division

3.8-10 On-going during construction, the property owner/developer shall ensure that all internal combustion engines on construction equipment are fitted with properly maintained mufflers.

Planning Department,
Building Division

3.8-11 On-going during grading operations, the property owner/developer shall implement standard practices from all applicable codes and ordinances to prevent erosion.

Public Works
Department,
Development
Services Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-19
NO. Measure REVIEW BY

3.8-12 Prior to issuance of each grading permit, the property owner/developer shall obtain required NPDES construction storm permits from the State Water Resources Control Board, if applicable. Copies of the Notice of Intent or permits, as applicable, shall be submitted to the City Engineer.

Regional Water
Quality Control
Board;
Public Works
Department,
Development
Services Division

3.8-13 On-going during demolition and construction, in the event that hazardous waste, including asbestos, is discovered during site preparation or construction, the property owner/developer shall ensure that the identified hazardous waste and/or hazardous material are handled and disposed of in the manner specified by the State of California Hazardous Substances Control Law (Health and Safety Code, Division 20, Chapter 6.5), according to the requirements of the California Administrative Code, Title 30, Chapter 22, and the Uniform Fire Code, Article 87.

Air Quality
Management District;
Orange County
Health Department;
Planning Department,
Building Division;
Fire Department;
Environmental
Protection Agency

3.9-1 On-going during Project operations, the property owner/developer will aggressively recruit workers who are already part of the resident work force in the region. Implementation of The Disneyland Resort Specific Plan will further efforts in offering employment opportunities at various socioeconomic levels. The requirements of the mitigation measure will be included in the lease or other agreement with all of the project participants.

Documentation indicating compliance with this mitigation measure will be included in the annual monitoring report ongoing during project operation.

Planning Department,
Planning Services
Division

3.10.1-1 Prior to commencement of structural framing on each parcel or lot, on-site fire hydrants shall be installed and charged, as required, by the property owner/developer.

Fire Department

3.10.1-2 Prior to approval of each grading plan, the property owner/developer shall submit an emergency fire access plan to ensure that service to the site is in accordance with Fire Department service requirements.

Fire Department

3.10.1-3 Prior to issuance of each building permit, the property owner/developer shall submit a Construction Fire Protection Plan, which shall include detailed design plans for accessibility of emergency fire equipment, fire hydrant location, and any other construction features required by the Fire Marshal. The property owner/developer shall be responsible for securing facilities acceptable to the Fire Department and hydrants shall be operational with required fire flow.

Fire Department

3.10.1-4 Prior to issuance of each building permit, and to be implemented prior to each final building and zoning inspection, plans shall indicate that all buildings, exclusive of open parking structures, shall have sprinklers installed by property owner/developer, as required by the Anaheim Fire Department.

Fire Department
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-20
NO. Measure REVIEW BY

3.10.1-5 Prior to Issuance of each building permit, plans shall be submitted to ensure that development is in accordance with the City of Anaheim Fire Department Standards, including:
a. Overhead clearance shall not be less than fourteen (14) feet for the full width of access roads.
b. Bridges and underground structures to be used for Fire Department access shall be designed to support Fire
Department vehicles weighing seventy-five thousand (75,000) pounds.
c. All underground tunnels shall have sprinklers. Water supplies are required at the entrances. Standpipes shall also be provided when determined to be necessary by the Fire
Department.
d. Adequate offsite public fire hydrants contiguous to the Specific Plan area and onsite private fire hydrants shall be provided by the property owner/developer. The precise number, types, and locations of the hydrants shall be determined during building permit review. Hydrants are to be a maximum of four hundred (400) feet apart.
e. A minimum residual water pressure of 20 psi shall remain in the water system. Flow rates for public parking facilities shall be set at 1,000 to 1,500 gpm.

Fire Department

3.10.1-6 Prior to issuance of each building permit, the property owner/developer shall comply with the Fire Protection Facilities and Paramedic Services Impact Fee Program (per Ordinance No. 5496 and Resolution No. 95R-73 dated May 16, 1995), as may be amended by the City.

Fire Department

3.10.1-7 Prior to approval of street improvement plans, the water supply system shall be designed by the property owner/developer to provide sufficient fire flow pressure and storage for the proposed land uses and fire protection in accordance with Fire Department requirements.

Fire Department,
Public Utilities
Department, Water
Services
Administration

3.10.1-8 Prior to each final building and zoning inspection, the property owner/developer shall place emergency telephone service numbers in prominent locations as approved by the Fire
Department.

Fire Department

3.10.1-9 On-going during Project operations, an on-site coordinator for the project shall coordinate earthquake training with the Fire Department for hotel staff and other employees. The requirements of the mitigation measure will be included in the lease or other agreement with all of the project participants. Documentation indicating compliance with this mitigation measure will be included in the annual monitoring report ongoing during project operation.

Fire Department
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-21
NO. Measure REVIEW BY

3.10.1-10 Prior to issuance of each building permit for hotels, the property owner/developer shall submit an earthquake emergency response plan for review and approval. That plan shall require posted notices in all hotel rooms on earthquake safety procedures.

Fire Department

3.10.2-1 Prior to approval of the first Final Site Plan for Area A; to be identified on plans submitted for building permits, plans shall be submitted showing the location of a police/security office identifiable and easily accessible by the public (i.e., “store-front” type of space) along with dedicated parking spaces for Police Department employees working in the space within the project site to the satisfaction of the Police Department.

Prior to the first final building and zoning inspection for Area A, Said police/security office space shall be made available to the Police Department for permanent occupancy at no cost to the City.

Police Department

3.10.2-2 On-going during Project operations, property owner/developer shall staff the Project with the needed level of uniformed private security officers working in pairs for patrol and surveillance of the facilities to the satisfaction of the Police Department, including possibly 24-hour coverage.

Police Department

3.10.2-3 Prior to issuance of each building permit, the Police Department shall review and approve the safety measures incorporated into the project including the parking structures. The security measures shall include, but not be limited to, closed circuit television surveillance/cameras and recording equipment or other substitute security measures as may be approved by the Police Department for the parking structures/facilities, lighting, and other defensible space measures throughout the project, as determined necessary by the Police Department.

Police Department

3.10.3-1 Prior to the first final zoning and building inspection, the property owner/developer shall submit project plans to the Director of Maintenance for review and approval to ensure that the plans comply with AB 939, the Solid Waste Reduction Act of 1989, as implemented by the City of Anaheim, the County of Orange Integrated Waste Management Plan, and the City of Anaheim Integrated Waste Management Plan.

Public Works
Department, Streets
and Sanitation
Division

3.10.3-2 Prior to the first final zoning and building inspection; and to be implemented during Project operations, a Solid Waste
Management Plan shall be submitted for review and approval by the property owner/developer to ensure that the project plans comply with AB 939, as administered by City of Anaheim, and the County’s and City’s Integrated Waste Management Plans. Waste management mitigation measures that shall be taken to reduce solid waste generation shall include:
a. Detailing the locations and design of solid waste and recyclables storage and collection facilities.
b. Complying with all Federal, State, and City regulations for hazardous material disposal.
c. Participating in the City of Anaheim’s voluntary “Recycle Anaheim” program or other substitute program as may be
Public Works
Department, Streets
and Sanitation
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-22
NO. Measure REVIEW BY
developed by the City.

In order to meet the requirements of the Solid Waste Reduction Act of 1989 (AB 939), the property owner/developer shall implement numerous solid waste reduction programs including, but not limited to, the following:
a. Facilitating paper recycling by providing chutes or convenient locations for sorting and recycling bins.
b. Facilitating cardboard recycling (especially from retail areas) by providing adequate space and centralized locations for collection and baling.
c. Facilitating glass recycling (especially from restaurants) by providing adequate space for sorting and storing.
d. Providing trash compactors for non-recyclable materials, whenever feasible, to reduce the total volume of solid waste and the number of trips required for collection.
e. Prohibition of curbside pick-up within the Anaheim
GardenWalk project.
f. Recycling of landscape green waste.

3.10.5-1 Prior to issuance of each building permit, the property owner/developer shall provide proof that school impact fees have been paid consistent with State statute. (Note: On January 25, 2006, the State Allocation Board increased the maximum Level 1 school fees from $0.36 to $0.42 per square foot of enclosed and covered space for commercial/industrial development.)
Planning Department,
Building Division

3.10.5-2 Prior to commencement of uses/activities authorized by Conditional Use Permit No. 4078, as amended; and on-going during Project operations, the property owner/developer shall coordinate with the Anaheim Union High School District to incorporate a retail training program into the Project for interested high school seniors. An on-site project coordinator shall ensure compliance with the plan. Proof of this program shall be submitted to the Planning Department within ninety (90) days following commencement of the uses/activities.

Planning Department,
Planning Services
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-23
NO. Measure REVIEW BY

3.10.6-1 Prior to issuance of each building permit; and to be implemented prior to final building and zoning inspections, among the water conservation measures to be shown on plans and implemented by the property owner/developer shall include the following:
a. Use of low-flow sprinkler heads in irrigation system b. Use of waterway recirculation systems
c. Low-flow fittings, fixtures, and equipment, including low flush toilets and urinals
d. Use of self-closing valves on drinking fountains
e. Use of reclaimed water for irrigation and wash-down when it becomes available
f. Continuation of the existing cooling tower recirculation system g. Use of efficient irrigation systems such as drip irrigation and automatic systems which use moisture sensors
h. Low-flow shower heads in hotels
i. Water-efficient ice machines, dishwashers, clothes washers, and other water-using appliances
j. Use of irrigation systems primarily at night when evaporation rates are lowest
k. Provide information to the public in conspicuous places regarding water conservation
l. Use of water-conserving landscape plant materials, as appropriate
m. Use of vacuum and other equipment to reduce the use of water for wash-down of exterior areas
Public Utilities
Department, Electric
Services
Administration,
Resource Efficiency;
Community Services
Department, Parks
Division

3.10.6-2 Prior to each final zoning and building inspection, the property owner/developer shall submit a certified water audit for landscape irrigation to the Public Utilities Systems Department, Electric Services Administration, Resource Efficiency Division, for review and approval.

Public Utilities
Department, Electric
Services
Administration,
Resource Efficiency

3.10.6-3 Prior to issuance of each building permit, the property owner/developer shall comply with the adopted Anaheim Resort Water Facilities Fee Program (Rule 15E of the Water Utilities Rates, Rules and Regulations per Resolution No. 95R-140, effective September 1, 1995), as may be amended by the City.

Public Utilities
Department, Water
Services Division

3.10.6-4 Prior to issuance of building permits; and prior to final building and zoning inspections, the water backflow equipment and any other large water system equipment shall be shown on plans to the satisfaction of the Public Utilities Department, Water Utility Division, in either underground vaults or behind the Setback Realm area in a manner fully screened from all public streets and alleys; and the facilities shall be installed in accordance with the plans.

Public Utilities
Department, Water
Services Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-24
NO. Measure REVIEW BY

3.10.6-5 Prior to approval of the Water System Improvement Plan, property owner/developer shall enter into an agreement recorded against the property with the City of Anaheim, to the satisfaction of the Utilities Department and City of Anaheim Attorney’s Office, to guarantee the property owner/developer’s participation in water system improvements necessitated by the project. The agreement shall contain provisions requiring the property owner/developer to pay or cause to be paid its fair share funding for said improvements and/or construct said improvements, if determined to be necessary by the Utilities Department, with reimbursement by other beneficiaries in accordance with the Utility Rates, Rules, and Regulations. Costs shall include the payment for
consultant/contractor services for the preliminary engineering, soils analysis, right-of-way acquisition, demolition, construction and inspection, and any other related expenses. Further, the property owner/developer shall submit an engineering report and phasing plan for review and approval by the Utilities Department setting forth the extent and timing of the water system improvements necessitated by the project for use in implementing the agreement. The property owner/developer shall at all times perform its obligations as set forth in said agreement.

Public Utilities
Department, Water
Services Division

3.10.7-1 Prior to each final building and zoning inspection, the property owner/developer shall comply with the Sewer Impact and
Improvement Fee Program for the South Central City Area (per Ordinance No. 5490 and Resolution No. 95R-60 dated April 18, 1995, as may be amended by the City). This SCASDS Fee
Program applies to the sewer discharge generated above the rate from the building footprints existing prior to the demolition of building on the project site (in 2003) and up to the maximum of 639,000 peak gpd. This Fee Program does not apply and mitigate the need of the reverse sewer line in Gene Autry Way.

Public Works
Department, Design
Division

3.10.7-2 Prior to issuance of the first building permit; to be implemented prior to final building and zoning inspection, a report documenting sewer capacity shall be submitted for review and approval. Prior to the first final building and zoning inspection, either a reverse-flow public sewer line shall be constructed in Gene Autry Way from a point east of the I-5/Anaheim Boulevard to State College Boulevard or other improvement(s) to the sewer system shall be made to accommodate the sewage flow in excess of that
projected from the land uses permitted by The Disneyland Resort Specific Plan within the boundaries of Anaheim GardenWalk, which cannot be accommodated by current capacity.

Public Works
Department, Design
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-25
NO. Measure REVIEW BY
Line sizing and implementation of this measure will be as follows:
a. Analyze the Anaheim GardenWalk sewer flows with the City’s updated Basin 8 model to determine local sewer impacts and downstream impacts to the Gene Autry Way sewer system.
b. Determine the size and limits of a new public sewer in Gene Autry Way, east of Interstate 5, to intercept and redirect flows from the ASAMLUP tributaries.
c. Coordinate all analysis, findings, and conclusions for approval with the City of Anaheim.
d. The Property owner/developer shall be responsible for funding this improvement.

3.10.8-1 Prior to issuance of each building permit, the property owner/developer shall comply with the Storm Drain Impact and Improvement Fee Program for the South Central City Area (per Ordinance No. 5491 and Resolution No. 95R-61 dated April 18, 1995, as may be amended by the City); or, the City may enter into alternative financing arrangements with the property
owner/developer prior to approval of the first Grading Plan.

Public Works
Department, Design
Division

3.10.9-1 Prior to issuance of each building permit, the property owner/developer shall submit plans showing that each of the project's buildings will comply with the State Energy Conservation Standards for New Residential and Nonresidential Buildings (Title 24, Part 6, Article 2, California Code of Regulations).

Public Utilities
Department, Electric
Services
Administration,
Resource Efficiency

3.10.9-2 Prior to issuance of each building permit for tenant improvements; and to be implemented prior to each final building and zoning inspection, in order to conserve energy, the property
owner/developer shall implement numerous energy saving
practices in compliance with Title 10, which may include the following:
a. Consultation with the City energy-conservation experts for assistance with energy-conservation design features.
b. Use of high-efficiency air conditioning systems controlled by a computerized management system including features such as a variable air volume system, a 100-percent outdoor air economizer cycle, sequential operation of air conditioning equipment in accordance with building demands, isolation of air conditioning to any selected floor or floors.
c. Use of electric motors designed to conserve energy.
d. Use of special lighting fixtures such as motion sensing light switch devices and compact fluorescent fixtures in place of incandescent lights.
e. Use of T8 lamps and electronic ballast. Metal halide or highpressure sodium for outdoor lighting and parking lots.

Public Utilities
Department, Electric
Services
Administration,
Resources Efficiency
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-26
NO. Measure REVIEW BY

3.10.9-3 Prior to issuance of the first building permit (submittal of conduit plans); to be implemented prior to final building and zoning inspection, the property owner/developer shall install electrical and communication conduit and substructures within the development site to provide for electrical distribution to serve the various uses within the development.

Public Utilities
Department, Electric
Services
Administration

3.10.9-4 Prior to the issuance of the first building permit for Area A and Area B, the property owner/developer shall pay fees in
accordance with Anaheim’s Electric Rates, Rules & Regulations for installation of backbone cables, switches and related facilities to provide electrical distribution to the development site.

Public Utilities
Department, Electric
Services
Administration

3.10.9-5 Prior to issuance of each building permit, the property owner/developer shall pay fees in accordance with Anaheim’s Electric Rates, Rules and Regulations for electrical commercial/ industrial services for specific uses within the development site.

Public Utilities
Department, Electric
Services
Administration

3.10.9-6 Completed 2/06

3.10.10-1 Prior to issuance of each building permit, the property owner/developer shall submit plans which shall ensure that buildings are in conformance with the State Energy Conservation Standards for nonresidential building (Title 24, Part 6, Article 2, California Administrative Code).

Public Utilities
Department, Electric
Services
Administration,
Resource Efficiency

3.10.10-2 Prior to each final building and zoning inspection, the property owner/developer shall implement a program (The Southern California Gas Company has developed several programs which are intended to assist in the selection of the most energy-efficient water heaters and furnaces) to reduce the demand on natural gas supplies. Proof of this program shall be submitted to the Planning Department in the form of a letter documenting compliance.

Planning Department,
Building Division

3.10.12-1 Prior to issuance of the first building permit for Area A, a preproject study of area television reception shall be undertaken by the property owner/developer to determine baseline conditions; and six months after topping out of each building over 75 feet in height, a follow-up study of area television reception shall be undertaken immediately by the property owner/developer. If the City of Anaheim determines that the proposed project creates a significant impact on broadcast television reception at local residences, a signal booster or relay system shall be installed on the roof of the tallest project building to restore broadcast television reception to its original condition as soon as practicable.

Planning Department,
Planning Services
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-27
NO. Measure REVIEW BY

3.11-1 Prior to approval of the first grading plan or issuance of the first demolition permit for Area B , whichever occurs first, investigation for the presence of cryptic tanks using geophysical methods shall be conducted in the subject area for the property owner/developer by a qualified environmental professional in the areas of former service stations and those areas known or thought to have been formerly occupied by USTs and where tank removal has not been verified prior to excavation or grading in these areas.

Soil sampling or a soil organic vapor survey may be required if soil sampling results are not available or indicate contamination is present above regulatory guidelines. If warranted, subsurface investigation and sampling shall be undertaken in these areas, and appropriate remediation measures developed, if necessary, before demolition, excavation, or grading takes place in these areas.

Fire Department,
Environmental
Protection Section

3.11-2 Prior to removal of underground tanks, a permit shall be obtained from the Environmental Protection Section of the Fire Department for removal of underground tanks by the property
owner/developer. During removal of the underground storage tank, a representative from the Fire Department, Environmental Protection Section, shall be onsite to direct soil sampling.

Fire Department,
Environmental
Protection Section

3.11-3 On-going during remediation, remediation activities conducted on behalf of the property owner/developer of surface or subsurface contamination not related to USTs shall be overseen by the Orange County Health Department. Information on subsurface contamination from an underground storage tank shall be provided to the Public Utilities Department, Water Services Administration, Environmental Services.

Orange County
Health Department;
Public Utilities
Department, Water
Services
Administration,
Environmental
Services

3.11-4 Prior to approval of the first grading plan or issuance of the first demolition permit, whichever occurs first, the property owner/developer shall submit a plan for review and approval by the Fire Department, which details procedures that will be taken if a previously unknown UST or other unknown hazardous materials or waste is discovered onsite.

Fire Department,
Environmental
Protection Section;
Orange County
Health Department

3.11-5 Prior to relocation of any transformers within the Project boundaries that may contain PCBs which are being moved or relocated as part of project development, the transformers shall be tested by the property owner/developer for PCBs.

Public Utilities
Department, Electric
Services
Administration

3.11-6 Prior to approval of a grading plan in Area B, a subsurface investigation and sampling of Area B, if needed, shall be undertaken by a qualified environmental professional for the property owner/developer to the satisfaction of the Public Utilities Department, Water Services Administration, Environmental Services, to determine if the former Chevron station’s USTs and/or business practices have environmentally impacted the subject property.

Public Utilities
Department, Water
Services
Administration,
Environmental
Services

3.11-7 Completed in 2002 prior to building demolition
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-28
NO. Measure REVIEW BY

3.11-8 Completed in 2002 prior to building demolition

3.11-9 On-going during demolition in Area B, appropriate disposal of lead and other hazardous materials to landfill shall be required, in compliance with all applicable federal, state, and local regulations depending on waste characterization. The State of California requires that all waste streams be characterized based on Waste Extraction Tests (WET), such as total Soluble Threshold Limit Concentrations (STLC), to determine appropriate disposal facility and procedures.

Fire Department,
Environmental
Protection Section

3.12-1 Prior to approval of the Final Site Plan; shown on plans submitted for building permits; and to be implemented prior to final building and zoning inspections, the property owner/developer shall submit plans which illustrate that all mechanical equipment and trash areas for the subject buildings will be screened from adjacent public streets.

Planning Department,
Planning Services
Division

3.12-2 Prior to approval of the first building permit in Area A and in Area B, the property owner/ developer shall submit a landscape and irrigation plan in conformance with the landscape plan submitted as part of the Final Site Plan(s) for the Area. This plan shall be prepared by a licensed landscape architect. The landscape plan shall include a phasing plan for the installation and maintenance of landscaping.

Planning Department,
Planning Services
Division

3.12-3 On-going during project operation, the property owner/developer shall participate in a landscape assessment and maintenance district for any properties owned by the property owner/developer, as adopted for the Anaheim Resort.

Public Works
Department,
Development
Services Division

3.12-4 Prior to submittal of each Final Site Plan, if the height of any building onsite is higher than shown on the conceptual
plans/exhibits submitted in connection with Conditional Use Permit No. 4078, the property owner/developer shall submit a shade and shadow analysis to the Planning Department for review and approval demonstrating that the proposed structure(s) would not create significant shade and shadow impacts on adjacent land uses. A significant shade and shadow impact would occur when outdoor active areas (e.g., eating areas along Harbor Boulevard, hotel/motel swimming pool areas, etc.) or structures that include sensitive uses (e.g., residences) have windows that normally receive sunlight are covered by shadows for more than 50 percent of the sunlight hours. If the analysis identifies shade and/or shadow impacts would occur and the building setback,
architectural massing and landscape requirements provisions set forth in Section 5.0, Design Plan of the Anaheim Resort Specific Plan, do not function as feasible mitigation measures, additional technical review of the structure(s) will be required. The height of all structures shall not exceed the maximum height permitted by The Disneyland Resort Specific Plan.

Planning Department,
Planning Services
Division
Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-29
NO. Measure REVIEW BY

3.12-5 Prior to issuance of the first building permit in Area A and in Area B, the property owner/ developer shall submit plans which detail the outdoor and, where applicable, indoor lighting system. The systems shall be designed and maintained in such a manner as to conceal light sources to the extent feasible to minimize light spillage and glare to the adjacent uses. The plans shall be prepared and signed by a licensed electrical engineer, with a letter from the engineer stating that, in the opinion of the engineer, this requirement has been met.

Planning Department,
Planning Services
Division

3.13-1 Prior to approval of each grading plan, the property owner/developer shall submit a letter identifying the certified archaeologist that has been hired to ensure that the following actions are implemented:

Public Works
Department,
Development
Services Division
a. The archaeologist must be present at the pre-grading conference in order to establish procedures for temporarily halting or redirecting work to permit the sampling,
identification, and evaluation of artifacts if potentially significant artifacts are uncovered. If artifacts are uncovered and determined to be significant, the archaeological observer shall determine appropriate actions in cooperation with the property owner/developer for exploration and/or salvage. b. Specimens that are collected prior to or during the grading process will be donated to an appropriate educational or research institution.
c. Any archaeological work at the site shall be conducted under the direction of the certified archaeologist. If any artifacts are discovered during grading operations when the archaeological monitor is not present, grading shall be diverted around the area until the monitor can survey the area.
d. A final report detailing the findings and disposition of the specimens shall be submitted to the City Engineer. Upon completion of the grading, the archaeologist shall notify the City as to when the final report will be submitted.

Modified Mitigation Monitoring Program No. 004a
Project: Anaheim GardenWalk
E-30
NO. Measure REVIEW BY

3.13-2 Prior to approval of each grading plan, the property owner/developer shall submit a letter identifying the certified paleontologist that has been hired to ensure that the following actions are implemented:

Public Works
Department,
Development
Services Division
a. The paleontologist must be present at the pre-grading conference in order to establish procedures to temporarily halt or redirect work to permit the sampling, identification, and evaluation of fossils if potentially significant paleontological resources are uncovered. If artifacts are uncovered and found to be significant, the paleontological observer shall determine appropriate actions in cooperation with the property
owner/developer for exploration and/or salvage.
b. Specimens that are collected prior to or during the grading process will be donated to an appropriate educational
research institution.
c. Any paleontological work at the site shall be conducted under the direction of the certified paleontologist. If any fossils are discovered during grading operations when the
paleontological monitor is not present, grading shall be diverted around the area until the monitor can survey the area. d. A final report detailing the findings and disposition of the specimens shall be submitted. Upon completion of the
grading, the paleontologist shall notify the City as to when the final report will be submitted.

3.14-1 Note: This measure has been deleted as it is required by Code.

Appendix N
ARSP

This page is intentionally blank.

The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
Table of Contents

1.0 Executive Summary........................................................................................................ 1-1

1.1 Introduction............................................................................................................................... 1-1

1.2 Purpose of the Specific Plan ..................................................................................................... 1-1

1.3 Organization of the Specific Plan Document ............................................................................. 1-2

1.4 Existing Setting ......................................................................................................................... 1-2

1.4.1 The Disneyland Resort Specific Plan ................................................................................. 1-5

1.4.2 The Hotel Circle Specific Plan............................................................................................ 1-5

1.5 Implementing the General Plan................................................................................................. 1-5

1.6 Specific Plan Goals................................................................................................................... 1-6

1.7 The Development Plan.............................................................................................................. 1-7

1.7.1 Land Use ........................................................................................................................... 1-7

1.7.2 Development Density......................................................................................................... 1-8

1.7.3 Development Standards and Guidelines ............................................................................ 1-8

1.7.4 Development Summary...................................................................................................... 1-8

1.8 Implementing the Specific Plan................................................................................................. 1-9

2.0 PLANNING CONTENT..................................................................................................... 2-1

2.1 Purpose of the Specific Plan ..................................................................................................... 2-1

2.2 Specific Plan Policies................................................................................................................ 2-1

2.2.1 Create and Enhance an Urban Destination Resort Environment........................................ 2-1

2.2.2 Establish a Unified Resort Identity ..................................................................................... 2-2

2.2.3 Supply Visitor and Convention Facilities to Meet Long-Term Demand ............................... 2-2

2.2.4 Improve Public Facilities, Services and Infrastructure to Accommodate Growth ................ 2-2

2.2.5 Improve the Transportation System ................................................................................... 2-2

2.2.6 Develop Implementation Mechanisms to Assure Quality Development.............................. 2-3

2.2.7 Enhance and Protect Surrounding Uses ............................................................................ 2-3

2.3 Authority and Scope of the Specific Plan................................................................................... 2-3

2.4 Relationship to City Planning Documents and Regulations ....................................................... 2-5

2.4.1 Relationship to the General Plan........................................................................................ 2-5

2.4.2 Relationship to the Zoning Ordinance ................................................................................ 2-5

2.4.3 California Environmental Quality Act Requirements ........................................................... 2-5

2.4.4 Relationship to The Disneyland Resort Specific Plan......................................................... 2-6

2.4.5 Relationship to the Hotel Circle Specific Plan..................................................................... 2-7

3.0 LAND USE PLAN............................................................................................................. 3-1

3.1 Regional Location ..................................................................................................................... 3-1

3.2 Existing Conditions ................................................................................................................... 3-1

3.2.1 The Specific Plan Area....................................................................................................... 3-1

3.2.2 Existing Uses ..................................................................................................................... 3-1

3.3 Land Use Plan .......................................................................................................................... 3-4

3.3.1 Land Use ........................................................................................................................... 3-4

3.3.2 Commercial Recreation (C-R) District Development Density.............................................. 3-7 The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)

3.3.3 Mobilehome Park (MHP) Overlay..................................................................................... 3-10

3.3.4 Anaheim Resort Residential (ARR) Overlay..................................................................... 3-10

3.3.5 Public Recreation (PR) District Development Density ...................................................... 3-10

3.3.6 Theme Park (TP) Overlay ................................................................................................ 3-10

3.3.7 Parking (P) Overlay.......................................................................................................... 3-10

3.3.8 Central Core Development Standards.............................................................................. 3-17

3.4 Non Visitor-Serving Uses ........................................................................................................ 3-19

4.0 PUBLIC FACILITIES PLAN ............................................................................................. 4-1

4.1 Regional Circulation Programs.................................................................................................. 4-1

4.2 Regional Infrastructure Programs ............................................................................................. 4-3

4.3 Vehicular Circulation Plan for the Anaheim Resort.................................................................... 4-3

4.3.1 Connections to Interstate 5 (I-5)......................................................................................... 4-3

4.4 Anaheim Resort Arterial/ Secondary System ............................................................................ 4-4

4.5 Transit Plans........................................................................................................................... 4-18

4.5.1 The Disneyland Resort..................................................................................................... 4-18

4.5.2 East-West Transit Connection.......................................................................................... 4-18

4.5.3 HOV Lane System ........................................................................................................... 4-18

4.5.4 Bus Service...................................................................................................................... 4-18

4.5.5 Intercity Commuter Rail Service....................................................................................... 4-18

4.6 Pedestrian Circulation Plans ................................................................................................... 4-19

4.7 Water...................................................................................................................................... 4-22

4.8 Sanitary Sewer ....................................................................................................................... 4-24

4.9 Storm Drain............................................................................................................................. 4-25

4.10 Electricity ................................................................................................................................ 4-26

4.11 Natural Gas............................................................................................................................. 4-27

4.12 Telephone Services ................................................................................................................ 4-27

4.13 Television/Cable Service......................................................................................................... 4-27

4.14 Solid Waste............................................................................................................................. 4-27

4.15 Public Services ....................................................................................................................... 4-28

5.0 DESIGN PLAN ................................................................................................................. 5-1

5.1 Design Plan Objectives............................................................................................................. 5-2

5.1.1 Create Visual Continuity between the ARSP Area and the Adjacent Disneyland Resort Specific Plan Area............................................................................................................. 5-2

5.1.2 Create a High Quality, Visually Appealing, Pedestrian-Oriented Environment.................... 5-2

5.1.3 Create Landscape and Design Guidelines to Reinforce the Area's Identity ........................ 5-3

5.1.4 Enhance Public Views of the Theme Parks, including Back-of-House Uses, From Public Walkways and Streets...................................................................................................................... 5-3

5.2 Design Concepts....................................................................................................................... 5-3

5.2.1 Transform and Unify with Landscape................................................................................. 5-3

5.2.2 Create a District with a Grand Scale .................................................................................. 5-3

5.2.3 Emphasize Landscaping on Public Streets ........................................................................ 5-4

5.2.4 Orient Visitors Visually ....................................................................................................... 5-4

5.2.5 Create a Recognizable Center for the Anaheim Resort...................................................... 5-4 The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)

5.2.6 Coordinate Streetscape Improvements with other Improvements ...................................... 5-5

5.2.7 Establish a Clear Design Hierarchy.................................................................................... 5-5

5.3 Landscape Concept Plan .......................................................................................................... 5-5

5.3.1 Plant Material Selection and Use ....................................................................................... 5-6

5.3.1.1 Basic Selection Criteria .................................................................................... 5-6

5.3.1.2 Tree Selection and Use Criteria........................................................................ 5-6

5.3.1.3 Shrub, Vine and Ground Cover Selection and Use Criteria .............................. 5-8

5.3.2 Layered Landscape Design Criteria ................................................................................. 5-10

5.3.3 Minimum Tree Density ..................................................................................................... 5-13

5.3.3.1 Tree Density to Vary According to Adjacent Use ............................................ 5-13

5.3.3.2 The Tree Density Factor................................................................................. 5-13

5.3.4 Plant Selection................................................................................................................. 5-16

5.4 Landscape Cross Sections ..................................................................................................... 5-18

5.5 Identity Concept Plan.............................................................................................................. 5-50

5.6 Design Criteria for the Public Realm ....................................................................................... 5-51

5.6.1 Gateways......................................................................................................................... 5-53

5.6.1.1 Freeway Gateways......................................................................................... 5-53

5.6.1.2 Arterial Gateways........................................................................................... 5-55

5.6.1.2.1 Harbor Boulevard North............................................................ 5-55

5.6.1.2.2 Harbor Boulevard South ........................................................... 5-55

5.6.1.2.3 Katella Avenue East ................................................................. 5-55

5.6.1.2.4 Katella Avenue West ................................................................ 5-56

5.6.1.3 Vehicular Arrival Gateway .............................................................................. 5-56

5.6.1.3.1 Theme Park East Overlay Vehicular Arrival Gateway ............... 5-56

5.6.1.3.2 Parking Overlay Vehicular Arrival Gateway............................... 5-56

5.6.1.4 Pedestrian Arrival Gateway ............................................................................ 5-57

5.6.1.4.1 Theme Park East Overlay Pedestrian Arrival Gateway ............. 5-57

5.6.2 Public Streets................................................................................................................... 5-57

5.7 Design Criteria for the Setback Realm .................................................................................... 5-58

5.7.1 Exterior Lighting............................................................................................................... 5-58

5.7.2 Freestanding Monument Sign Guidelines ........................................................................ 5-58

5.7.3 Central Core .................................................................................................................... 5-59

5.7.3.1 Central Core Architectural Guidelines............................................................. 5-60

5.7.3.2 Central Core Circulation and Parking Guidelines............................................ 5-60

5.7.3.3 Central Core Landscape Guidelines............................................................... 5-61

5.7.4 Areas Outside of the Central Core ................................................................................... 5-61

5.8 Design Criteria for the Private Realm...................................................................................... 5-62

5.8.1 Organization of Private Realm Design Standards and Guidelines.................................... 5-62

5.8.2 General Site Planning Guidelines .................................................................................... 5-62

5.8.3 Service, Storage and Maintenance Areas and Loading Docks Guidelines ....................... 5-63

5.8.4 Exterior Lighting Guidelines ............................................................................................. 5-63

5.8.5 Surface Parking Area Guidelines ..................................................................................... 5-64

5.8.6 Parking Structure Guidelines ........................................................................................... 5-65

5.8.7 Building Appearance Guidelines ...................................................................................... 5-66 The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)

5.8.8 360 Degree Architectural Treatments............................................................................... 5-67

5.8.9 Building Massing.............................................................................................................. 5-67

5.8.10 Building Materials and Colors .......................................................................................... 5-68

5.8.10.1 Walls ............................................................................................................ 5-68

5.8.10.2 Windows ...................................................................................................... 5-68

5.8.10.3 Roof Materials .............................................................................................. 5-69

5.8.10.4 Building Color............................................................................................... 5-69

5.8.10.5 Awnings ....................................................................................................... 5-69

5.8.11 Sign Guidelines................................................................................................................ 5-69

5.8.12 Landscape Guidelines ..................................................................................................... 5-70

5.8.13 Wall and Fence Guidelines .............................................................................................. 5-71

5.8.14 Pedestrian Paving Guidelines .......................................................................................... 5-71

6.0 General Plan Consistency.............................................................................................. 6-1

7.0 Zoning and Development Standards............................................................................. 7-1

8.0 Legal Description............................................................................................................ 8-1

LIST OF EXHIBITS
Exhibit 1.4-1 ARSP/The Anaheim Resort Boundaries ............................................................................ 1-4 Exhibit 1.8-1 Development Summary Plan ........................................................................................... 1-10 Exhibit 3.1-1 Regional Location Map...................................................................................................... 3-1 Exhibit 3.2-1 ARSP/The Anaheim Resort Boundaries ............................................................................ 3-2 Exhibit 3.2-2 Aerial Photograph with the ARSP and Anaheim Resort Boundaries .................................. 3-3 Exhibit 3.3-1 Development Plan ............................................................................................................. 3-6 Exhibit 3.3-2 Commercial Recreation (C-R) District Development Density Plan ..................................... 3-9 Exhibit 3.3-3 Mobilehome Park (MHP) Overlay in the C-R District........................................................ 3-12 Exhibit 3.3-4 Anaheim Resort Residential (ARR) Overlay in the C-R District........................................ 3-13 Exhibit 3.3-5 Public Recreation (PR) District Plan ................................................................................ 3-14 Exhibit 3.3-6 Theme Park (TP) Overlay................................................................................................ 3-15 Exhibit 3.3-7 Parking (P) Overlay ......................................................................................................... 3-16 Exhibit 3.3-8 Central Core Plan............................................................................................................ 3-18 Exhibit 4.1-1 Vehicular Circulation Plan.................................................................................................. 4-2 Exhibit 4.4-1 Cross Section Street Segments Within The Anaheim Resort............................................. 4-6 Exhibit 4.4-1 Disneyland Drive (North of Ball Road) Cross Section ........................................................ 4-7 Exhibit 4.4-2 Disneyland Drive (Between 825 feet n/o Katella Avenue and 1,350 feet n/o Katella Avenue) Cross Section.......................................................................................................................................... 4-7 Exhibit 4.4-3 West Street (South of Katella Avenue) Cross Section ....................................................... 4-8 Exhibit 4.4-4 West Place Cross Section ................................................................................................. 4-8 Exhibit 4.4-5 Disney Way (East of Clementine Street) Cross Section .................................................... 4-8 Exhibit 4.4-6 Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland Drive) Cross Section.................................................................................................................................................. 4-10 The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
Exhibit 4.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland Drive) Cross Section.................................................................................................................................................. 4-10 Exhibit 4.4-8 Walnut Street (Between Ball Road and Goodhue Avenue) Cross Section ....................... 4-11 Exhibit 4.4-9 Harbor Boulevard (Between Chapman Avenue and Orangewood Avenue) Cross Section ................................................................................................................................................ 4-11 Exhibit 4.4-10 Harbor Boulevard (Orangewood Avenue to Manchester Avenue on the East Side and Orangewood Avenue to 150-250 Feet South of Manchester Avenue on the West Side) Cross Section 4-12 Exhibit 4.4-11 Harbor Boulevard (Between Manchester Avenue on the East Side and 150-250 feet South of Manchester Avenue on the West Side to the Interstate 5 Interchange) Cross Section ...................... 4-12 Exhibit 4.4-12 Harbor Boulevard (Interstate 5 to Vermont Avenue) Cross Section ............................... 4-12 Exhibit 4.4-13 Ball Road (With Landscaped Median West of West Place) Cross Section..................... 4-12 Exhibit 4.4-14 Ball Road (Between West Place and Cast Place) Cross Section ................................... 4-13 Exhibit 4.4-15 Ball Road (East of Cast Place) Cross Section ............................................................... 4-13 Exhibit 4.4-16 Clementine Street Cross Section................................................................................... 4-13 Exhibit 4.4-17 Haster Street/Anaheim Boulevard Cross Section........................................................... 4-14 Exhibit 4.4-18 Convention Way Cross Section ..................................................................................... 4-14 Exhibit 4.4-19 Gene Autry Way (East of Haster Street) Cross Section ................................................. 4-15 Exhibit 4.4-20 West Manchester Avenue Cross Section .................................................................... 4-15 Exhibit 4.4-21 North Manchester Avenue (Adjacent to Interstate 5, North of the Parking Overlay) Cross Section.................................................................................................................................................. 4-15 Exhibit 4.4-22 North Manchester Avenue (Adjacent to Interstae 5 and the Praking Overlay, North of Alro Way) Cross Section ............................................................................................................................. 4-16 Exhibit 4.4-23 Manchester Avenue, East of Anaheim Boulevard (Adjacent to Interstate 5) Cross Section .............................................................................................................................................................. 4-16 Exhibit 4.4-24 Orangewood Avenue Cross Section.............................................................................. 4-16 Exhibit 4.4-25 Chapman Avenue Cross Section................................................................................... 4-16 Exhibit 4.4-26 Alro Way Cross Section................................................................................................. 4-16 Exhibit 4.4-27 Casa Vista Street Cross Section.................................................................................... 4-17 Exhibit 4.4-28 Vermont Avenue Cross Section..................................................................................... 4-17 Exhibit 4.4-29 Wilken Way Cross Section .......................................................................................... 4-17 Exhibit 4.4-30 Zeyn Street Cross Section ........................................................................................... 4-17 Exhibit 4.6-1 Proposed Pedestrian Circulation ..................................................................................... 4-20 Exhibit 4.6-2 Pedestrian and Vehicular Access Points ......................................................................... 4-21 Exhibit 5.2-1 Utilize the Streets for Landscaping .................................................................................... 5-4 Exhibit 5.2-2 The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and the Private Realm ................................................................................................................................... 5-5 Exhibit 5.3-1 Medium Canopy Trees ...................................................................................................... 5-7 Exhibit 5.3-2 Large Canopy Trees.......................................................................................................... 5-7 Exhibit 5.3-3 Vertical and Pyramidal Trees............................................................................................. 5-8 Exhibit 5.3-4 Use of Shrubs to Screen Surface Parking Lots.................................................................. 5-9 Exhibit 5.3-5 Formal (Clipped) Hedges Vary in Height ........................................................................... 5-9 Exhibit 5.3-6 Ground Cover Includes Turf and Other Grasses, Annuals, and Other Varieties of Plants 5-10 Exhibit 5.3-7 Layered Landscape Design Criteria for Properties with Frontages Greater than 300 Feet5-11 Exhibit 5.3-8 Layered Landscape Design Criteria for Properties with Frontages Less than 300 Feet ... 5-11 The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
Exhibit 5.3-9 Layered Landscape Setback Width Criteria..................................................................... 5-12 Exhibit 5.3-10 Tree Density Factor Plan............................................................................................... 5-15 Exhibit 5.4-1 Landscape Cross Sections .............................................................................................. 5-19 Exhibit 5.4-1 Disneyland Drive (North of Ball Road) Landscape Cross Section .................................... 5-20 Exhibit 5.4-2 Disneyland Drive (Between 825 feet n/o Katella Avenue and 1,350 feet n/o Katella Avenue) Landscape Cross Section ..................................................................................................................... 5-21 Exhibit 5.4-3 West Street (South of Katella Avenue) Landscape Cross Section ................................... 5-22 Exhibit 5.4-4 West Place Landscape Cross Section............................................................................. 5-23 Exhibit 5.4-5 Disney Way (East of Clementine Street) Landscape Cross Section ................................ 5-24 Exhibit 5.4-6 Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland Drive) Landscape Cross Section ..................................................................................................................... 5-25 Exhibit 5.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland Drive) Landscape Cross Section ..................................................................................................................... 5-26 Exhibit 5.4-8 Walnut Street Landscape Cross Section ......................................................................... 5-28 Exhibit 5.4-9 Harbor Boulevard (Between Chapman Avenue and Orangewood Avenue) Landscape Cross Section.................................................................................................................................................. 5-28 Exhibit 5.4-12 Harbor Boulevard (Orangewood to Manchester on the East Side and Orangewood to 150- 250 Feet South of Manchester Avenue on the West Side) Landscape Cross Section........................... 5-29 Exhibit 5.4-11 Harbor Boulevard (Between Manchester Avenue on the East Side and 150-250 feet South of Manchester Avenue on the West Side to the Interstate 5 Interchange) Landscape Cross Section .... 5-30 Exhibit 5.4-12 Harbor Boulevard (Interstate 5 to Vermont Avenue) Landscape Cross Section ............. 5-31 Exhibit 5.4-13 Ball Road (West of West Place) Landscape Cross Section ........................................... 5-32 Exhibit 5.4-14 Ball Road (Between West Place and Harbor Boulevard) Landscape Cross Section ...... 5-33 Exhibit 5.4-15 Ball Road (East of Cast Place) Landscape Cross Section ............................................. 5-34 Exhibit 5.4-16 Clementine Street Landscape Cross Section................................................................. 5-35 Exhibit 5.4-17 Haster Street/Anaheim Boulevard Landscape Cross Section ........................................ 5-36 Exhibit 5.4-18 Convention Way Landscape Cross Section................................................................... 5-37 Exhibit 5.4-19 Gene Autry Way Landscape Cross Section................................................................... 5-38 Exhibit 5.4-20 West Manchester Avenue Landscape Cross Section .................................................... 5-39 Exhibit 5.4-21 North Manchester Avenue (Adjacent to Interstate 5, North of the Parking Overlay) Landscape Cross Section ..................................................................................................................... 5-40 Exhibit 5.4-22 North Manchester Avenue (Adjacent to Interstate 5 and the Parking Overlay, North of Alro Way) Landscape Cross Section ............................................................................................................ 5-41 Exhibit 5.4-23 Manchester Avenue, East of Anaheim Boulevard (Adjacent to Interstate 5) Landscape Cross Section........................................................................................................................................ 5-42 Exhibit 5.4-24 Orangewood Avenue Landscape Cross Section............................................................ 5-43 Exhibit 5.4-25 Chapman Avenue Landscape Cross Section................................................................. 5-44 Exhibit 5.4-26 Alro Way Landscape Cross Section............................................................................... 5-45 Exhibit 5.4-27 Casa Vista Street Landscape Cross Section ................................................................. 5-46 Exhibit 5.4-28 Vermont Avenue Landscape Cross Section................................................................... 5-47 Exhibit 5.4-29 Wilken Way Landscape Cross Section .......................................................................... 5-48 Exhibit 5.4-30 Zeyn Street Landscape Cross Section........................................................................... 5-49 Exhibit 5.6-1 The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and the Private Realm ................................................................................................................................. 5-51 The Anaheim Resort Specific Plan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
Exhibit 5.6-2 The Public Realm ............................................................................................................ 5-52 Exhibit 5.6-3 Gateway Location Plan.................................................................................................... 5-54 Exhibit 5.6-4 Harbor Boulevard North Gateway.................................................................................... 5-55 Exhibit 5.6-5 Katella Avenue West Gateway ........................................................................................ 5-56 Exhibit 5.7-1 The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and the Private Realm ................................................................................................................................. 5-58 Exhibit 5.7-2 Freestanding Monument Sign.......................................................................................... 5-59 Exhibit 5.7-3 Freestanding Sign Design Criteria ................................................................................... 5-59 Exhibit 5.7-4 Basic Central Core Design Principles .............................................................................. 5-59 Exhibit 5.7-5 Redundant Curb Cuts...................................................................................................... 5-60 Exhibit 5.7-6 Consolidate Curb Cuts .................................................................................................... 5-60 Exhibit 5.7-7 Limit Portion of Elevation Devoted to Parking Area Entries.............................................. 5-60 Exhibit 5.7-8 Special Intersection Landscape Treatment...................................................................... 5-61 Exhibit 5.7-9 Harbor Boulevard/Katella Avenue Intersection Area........................................................ 5-61 Exhibit 5.7-9 Harbor Boulevard/Katella Avenue Intersection Area........................................................ 5-65 Exhibit 5.8-1 The Three Elements of the Design Hierarchy: The Public Realm, The Setback Realm, and the Private Realm ................................................................................................................................. 5-62 Exhibit 5.8-2 Landscape Buffer between Uses ..................................................................................... 5-63 Exhibit 5.8-3 Screen Service Areas from View ..................................................................................... 5-63 Exhibit 5.8-4 Screen Parking From View.............................................................................................. 5-65 Exhibit 5.8-5 Pedestrians Move Perpendicular to Parking Spaces ....................................................... 5-65 Exhibit 5.8-6 Landscaping Detail at Ground Level................................................................................ 5-71

LIST OF TABLES
Table 1.8-1 Development Summary..................................................................................................... 1-11 Table 1.8-2 Existing and Permitted Development................................................................................. 1-12 Table 4.8-1 Existing Sewer System Deficiencies and Recommended Improvements for Year 2030 .... 4-25 Table 5.3-1 Levels of Tree Density....................................................................................................... 5-13 Table 5.3-2 Tree Point Values.............................................................................................................. 5-14 Table 5.8-1 Allowable Lighting Levels by Level of Security .................................................................. 5-64

APPENDICES
Appendix A - List of Specific Plan Amendments, Adjustments and Associated Actions (Note: For information only: This document will be updated after subsequent amendments or adjustments to the Specific Plan.) The
Anaheim Resort SpecificPlan Table of Contents
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
This page is intentionally blank.

The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-1

1.0 Executive Summary

1.1 Introduction
On September 27, 1994, the Anaheim City
Council adopted Ordinance No. 5453 relating to
the establishment of Zoning and Development
Standards for the Anaheim Resort Specific Plan
(ARSP) No. 92-2 by the addition of Chapter

18.116 (formerly 18.48) to the Anaheim Municipal
Code, and Ordinance No. 5454, amending the
zoning map to reclassify approximately 549.5
acres of certain real property into the ARSP. The
ARSP was specifically designated by the City’s
General Plan for recreation and
tourist/convention-related activities.

Since the adoption of the ARSP, proposed
modifications to the specific plan have included
16 amendments and 13 adjustments, which have
included an expansion of the ARSP area to
include 31.8 additional acres, increasing the total
acreage of the ARSP area to 581.3 acres. Refer
to Appendix A, ‘List of Specific Plan Amendments
and Adjustments and Associated Actions
Including General Plan Amendments’ for a
consolidated list of all amendments and
adjustments.

In 2021, to allow continued, long-term growth of
The Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. (Disney) proposed
DisneylandForward to allow the transfer of uses
permitted under The Disneyland Resort Project to
other areas of the Disneyland Resort Specific
Plan No. 92-1 (DRSP) and properties within the
ARSP owned or leased by Disney or other
subsidiaries of The Walt Disney Company
(Disney ARSP Properties, and, collectively with
Disney's properties in the DRSP, Disney Property
or Disney Properties). This proposal did not
request an increase in the amount of
development square footage or hotel rooms
allowed in the DRSP, or the number of hotel
rooms allowed in the ARSP. However, it included
an increase of 4,376 theme park-related parking
spaces in the ARSP. The proposal also
requested future administrative review by the City
of Disney's development projects on Disney
Property.

In [insert year], the Anaheim City Council
approved DisneylandForward, including
amendments to the Land Use and Circulation
Elements of the City's General Plan and the
Bicycle Master Plan [Resolution No. xxx, adopted
on xxx], and Amendment No. 17 to the ARSP
document and zoning and development
standards [Ordinance Nos. adopted on xxx].

1.2 Purpose of the Specific Plan
The purpose of the ARSP is to provide a longrange comprehensive plan for future development of approximately 581.3 acres within
The Anaheim Resort, which encompasses 1,078
acres generally located adjacent to and
southwest of Interstate 5 (I-5). To achieve this,
the ARSP establishes an overall identity and land
use plan that is intended to maximize the area's
potential, guide future development, and ensure
a balance between growth and infrastructure.

The ARSP additionally includes specific zoning
and development standards, design guidelines, a
streetscape program, and a public facilities plan,
which describe how the Plan's goals and
objectives will be realized. The ARSP will permit
the development of hotel, convention, retail, and
other visitor-serving uses as well as the infrastructure improvements that will be needed to support future development.

The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-2

1.3 Organization of the Specific
Plan Document
The Specific Plan is divided into eight sections:
• Section 1.0, the Executive Summary, is
a brief overview of the ARSP.
• Section 2.0, the Planning Context,
discusses the purpose of the ARSP, the
City planning policies that affect
development of the ARSP area, the
authority and scope of the ARSP, and its
relationship to other City planning
documents.
• Section 3.0, the Land Use Plan,
describes existing land uses and
conditions within the ARSP area, and
describes the proposed land uses and
development densities.
• Section 4.0, the Public Facilities Plan,
discusses the existing and proposed
infrastructure within the Specific Plan
area, including, but not limited to,
circulation and transit connectivity, water,
sewer, waste, and energy services.
• Section 5.0, the Design Plan establishes
the design criteria for the ARSP area.
• Section 6.0, General Plan Consistency,
describes how the ARSP is consistent
with the City's General Plan.
• Section 7.0, the Zoning and
Development Standards, regulate
development within the ARSP area.
• Section 8.0, Zoning Explanation,
compares the development standards
contained in the Plan to existing City
regulations.
• Section 9.0, Legal Description, contains
a legal description of the Specific Plan
area.

The Anaheim Commercial Recreation Area
Maximum Permitted Structural Height Map
(permitted by Section 18.40.080 (Structural
Height Limitations – Anaheim Municipal
Code)), The Anaheim Resort Public Realm
and Landscape Program, The Anaheim
Resort Identity Program and Planning
Standard Details 5-9, which are referenced
throughout the Specific Plan, are on file with
the City of Anaheim Planning and Building
Department.

1.4 Existing Setting
The ARSP area encompasses 581.3 acres within
the 1,078-acre Anaheim Resort, a portion of the
City of Anaheim specially designated by the
City's General Plan for recreation and
tourist/convention-related activities and
supporting uses. The Anaheim Resort is located
35 miles southeast of downtown Los Angeles and
7 miles northwest of Santa Ana, in Central
Orange County. As shown in Exhibit 1.4-1
(ARSP/The Anaheim Resort Boundaries), The
Anaheim Resort is located generally west of the
I-5 corridor, south of Vermont Avenue, east of
Walnut Street, and north of Chapman Avenue.

In addition to this Specific Plan, the City has
undertaken and adopted other planning efforts
for the remaining 496.5 acres in The Anaheim
Resort. The City has adopted the Disneyland
Resort Specific Plan (Specific Plan No. 92-1)
covering 489.7 acres of The Anaheim Resort and
the Hotel Circle Specific Plan (Specific Plan No.

93.1) covering 6.8 acres of The Anaheim Resort.

The three Specific Plans have been prepared to
complement one another by incorporating similar
zoning and development standards, design
guidelines, streetscape and signage programs
and infrastructure improvements. Together, these
documents guide the development and
enhancement of The Anaheim Resort. In addition
to the specific plans, the City Council also
adopted The Anaheim Resort Identity Program
and The Anaheim Resort Public Realm
Landscape Program to provide for the
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-3
streetscape elements and landscape plans that
will be implemented in public rights-of-way within
The Anaheim Resort.

The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-4
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-5

1.4.1 The Disneyland Resort Specific
Plan
On June 29, 1993, the City of Anaheim approved
The Disneyland Resort Project and adopted The
Disneyland Resort Specific Plan (SP 92-1) to
provide for the development of an international
multi-day vacation destination resort
encompassing approximately 489.7 acres of The
Anaheim Resort. The Disneyland Resort Project
provides for and the DRSP permits the
development of new theme park uses, additional
hotels and entertainment areas, new parking
facilities, and an internal transportation system. In
addition, the DRSP permits the existing
Disneyland theme park to continue to be modified
with new attractions and other improvements.

Although they are separate projects, the ARSP
and The DRSP have been prepared to
complement one another by incorporating similar
zoning and development standards, streetscape
and signage programs, and infrastructure
improvements for the overall enhancement of
The Anaheim Resort.

In 2021, to allow continued, long-term growth of
The Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. proposed DisneylandForward,
an update to The Disneyland Resort Project (1)
to allow the transfer of theme park, hotel and
other retail, dining and entertainment uses, and
parking permitted in The Disneyland Resort
Project to other areas of the DRSP and
properties within ARSP owned or leased by
Disney or other subsidiaries of The Walt Disney
Company (Disney ARSP Properties, and,
collectively with Disney’s properties in the DRSP,
Disney Property or Disney Properties), and (2) to
provide for future administrative review by the
City of Disney’s development projects within the
Specific Plan area and The Disneyland Resort
Specific Plan area. This proposal did not request
an increase in the amount of development
square footage or hotel rooms allowed in the
DRSP, or the number of hotel rooms allowed in
the ARSP. However, it would include an increase
of 4,376 theme park-related parking spaces in
the ARSP. The proposal allowed theme park
square footage to move from the DRSP Theme
Park District to the ARSP Theme Park East and
West Overlays provided the total theme park
square footage does not exceed 6,850,000
square feet and proposal allowed the parking
spaces to move from the DRSP Parking District
East Parking Area to the adjacent ARSP Parking
Overlay, in conjunction with development of a
parking facility in the East Parking Area. Any
amount of parking spaces constructed in the P
Overlay at Manchester Avenue would result in an
equivalent amount of potential parking spaces
removed from the allotment for the DRSP
Parking District, East Parking Area. Refer to
Chapter 3 for additional information and Exhibit

1.8-1 (Development Plan) for the location of the
Theme Park and Parking Overlays.

1.4.2 The Hotel Circle Specific Plan
On August 16, 1994, the City of Anaheim
adopted the Hotel Circle Specific Plan (SP 93-1)
for the remaining 6.8 acres of The Anaheim
Resort. This specific plan allows for the
development of up to 969 hotel rooms. All of the
parcels within the specific plan area are
developed with a total of 818 hotel rooms.

1.5 Implementing the General
Plan
The Specific Plan implements the City’s General
Plan by addressing the pertinent goals, policies
and objectives of the General Plan. In 1994,
when the City adopted the ARSP, the following
General Plan policies relevant to development of
the Specific Plan were in place:
• To maintain and encourage Anaheim's
position as a nationally recognized tourist,
convention and recreation center;
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-6
• To increase sales tax yields and further
enhance the economic base of the
community, thereby lessening the tax burden
on real property;
• To encourage the development of quality
facilities that complement conventions, family
entertainment, and recreation within
appropriate areas of the community; and,
• To maintain the integrity of the Commercial
Recreation Area (now referred to as The
Anaheim Resort) by permitting only
compatible land uses within this designated
area.

In 2004, the Anaheim City Council adopted a
comprehensive update of its General Plan, which
continues to incorporate similar goals and
policies relevant to the ARSP.

A complete discussion of the relationship
between the ARSP and the Anaheim General
Plan is found in Section 6.0, General Plan
Consistency.

1.6 Specific Plan Goals
The General Plan is implemented through the
following overall goals of the ARSP:
• To foster the growth of the City's economic
potential by revitalizing The Anaheim Resort;
• To treat all landowners and users in The
Anaheim Resort fairly, while recognizing the
economic and social needs of the entire City;
• To ensure that development complements the
City's investment in the Anaheim Convention
Center and other area resources and
interests;
• To maintain and enhance existing recreation
and convention-oriented land uses;
• To protect adjacent residential land uses by
buffering them from potential land use
impacts associated with development of The
Anaheim Resort;
• To maintain or enhance traffic and circulation
in and around The Anaheim Resort;
• To provide convenient access to all hotel,
restaurant, and retail opportunities in The
Anaheim Resort to enhance the area-wide
tourist experience;
• To protect adjacent residential neighborhoods
from unnecessary intrusion by vehicles
traveling to and from The Anaheim Resort;
• To accommodate potential future regional
transportation networks into the Plan;
• To provide for necessary public infrastructure
and services to maximize the development
potential of The Anaheim Resort;
• To create a coherent, unique resort identity
that reinforces The Anaheim Resort's image
as a high-quality destination resort;
• To establish a high-quality pedestrian
environment;
• To improve the aesthetic character of The
Anaheim Resort by visually defining the
boundaries with appropriate landscape
treatments;
• To enhance the Anaheim Resort area by
providing a wider range of attractions, hotel
accommodations, restaurants, shopping
opportunities, and public parking;
• To support the continued reimagination of
The Disneyland Resort to meet and exceed
evolving guest expectations for immersive
entertainment and technological advances in
theme park and other resort experiences in
the Theme Park Overlays; and
• To continue to fulfill the following vision of
Walt Disney: “Disneyland will never be
completed…It will continue to grow as long as
there is imagination left in the world.”
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-7

1.7 The Development Plan
The Development Plan establishes the basic
framework for land use and development
standards, which will govern development of the
ARSP area. It defines the permitted uses,
development density, building setbacks, building
heights, and other design standards that will be
complied with by individual property owners and
developers when building new or renovating
existing projects.

1.7.1 Land Use
The land uses permitted within the ARSP area
will be consistent with the overall goal of
maximizing the area's potential, while
establishing an overall identity. The primary intent
is to provide for the needs of visitors to the area's
attractions. Consequently, the permitted uses are
primarily those that, by their nature, are related to
tourism and entertainment.

The 518.5-acre Commercial Recreation (C-R)
District (Development Area 1), which
encompasses the entire ARSP area, except the
Anaheim Convention Center and the Hilton
Anaheim hotel, provides for the development of
hotels, motels, convention and conference
facilities, as well as restaurants, retail shops, and
entertainment uses. Since the uses are oriented
towards entertainment, retail uses such as
neighborhood shopping centers will not be
permitted. In addition, to discourage use of
automobiles, drive-through restaurants and other
similar uses will not be permitted.

The C-R District also includes three properties on
approximately 31.5 acres, which are within the
Mobilehome Park (MHP) Overlay. The MHP
Overlay encompasses two existing mobile home
parks and a recreational vehicle (RV) park. The
requirements set forth in Chapter 18.14 (Public
and Special-Purpose Zones) of the Anaheim
Municipal Code provide development standards,
regulations, and procedures to mitigate relocation
problems and adverse effects of effects of
displacement upon mobilehome owners when a
park is converted to another land use.

Also located within the C-R District, the 59.3-acre
Anaheim Resort Residential (ARR) Overlay
allows for conditionally permitted residential uses
in conjunction with the development of a fullservice hotel having at least 300 hotel rooms and where (i) hotel uses comprise at least half of the
site density, (ii) residential uses on the site are
fully integrated into the hotel, and (iii) adjacent to
public rights-of-way, residential uses are at least
two stories or 25 feet above ground level.

The 62.8-acre Public Recreation (PR) District
(Development Area 2) encompasses the City of
Anaheim Convention Center and associated
parking complexes, and the 1,600-room Hilton
Anaheim hotel. The PR District allows up to
2,158,363 square feet of convention
center/meeting space; 100,000 square feet of
outdoor programmable space; 2,500 hotel rooms;
and 180,000 square feet of commercial space.

Development within this district is subject to the
requirements of the Public Recreation (PR) Zone.

The purpose of the PR Zone, which is set forth in
Chapter 18.14 of the Anaheim Municipal Code, is
to preserve, regulate and control the orderly use
of City-owned property and adjacent private
property.

The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-8
Also located in the C-R District, the Theme Park
(TP) Overlay includes the TP East Overlay and
TP West Overlay. The TP East Overlay includes
one property on approximately 52.6 acres and
currently includes the Toy Story surface parking
lot associated with The Disneyland Resort. The
TP West Overlay includes two properties on
approximately 5.15 acres and currently
encompasses the existing Paradise Pier Hotel
and associated parking structure. The TP
Overlays allow for theme park uses in
conjunction with hotel and other uses allowed by
the C-R District.

Also located in the C-R District, the Parking (P)
Overlay includes two separate areas one at
Manchester Avenue, directly north of the DRSP
Parking District East Parking Area, and one at
the northeast corner of Harbor Boulevard and
Ball Road. The Parking Overlay at Manchester
Avenue includes three properties on
approximately 14.88 acres. The Parking Overlay
at Harbor Boulevard and Ball Road includes eight
properties on approximately 10.69 acres. The
Parking Overlay allows for parking and limited
back-of-house uses, such as administrative
offices and other incidental theme park support
facilities, such as restrooms and parking facility
offices, in conjunction with hotel and other uses
allowed by the C-R District.

1.7.2 Development Density
Because of the location of the ARSP area in an
urban setting, the density at which particular
areas are developed is an important planning
consideration. In particular, the timing and
availability of infrastructure (such as vehicular
access, water and sewer capacity, and storm
drainage facilities) is the critical determinant for
the future development potential of the ARSP
area. In addition, proximity to the area’s
attractions, and the relationship to surrounding
land uses was considered. For the allowable
development densities within the ARSP area,
refer to Section 3.3 of the Land Use Plan.

1.7.3 Development Standards and
Guidelines
In addition to regulations that will govern
development density, the ARSP contains
development standards which regulate building
mass and setbacks from property lines. The
ARSP also contains regulations which define
required landscape treatments both within the
public right-of-way and in required setbacks, as
well as guidelines for site planning, service area
design, parking facility design, building
appearance, signs, and other landscaping.

In recognition of the importance of the Harbor
Boulevard and Katella Avenue corridors to the
identity of The Anaheim Resort, the plan
establishes special standards and guidelines for
the central portion of The Anaheim Resort. This
area, known as the Central Core, encompasses
lots or parcels in the ARSP area with frontage on
Harbor Boulevard between I-5 and Orangewood
Avenue, and on Katella Avenue between Walnut
Street and Haster Street/Anaheim Boulevard.

1.7.4 Development Summary
The maps and accompanying tables on the
following pages summarize the Development
Plan for the ARSP. Exhibit 1.7-1 (Development
Summary Plan), shows the location of the C-R
District (Development Area 1), the PR District
(Development Area 2), the Central Core, the
Mobilehome Park (MHP) Overlay, the Anaheim
Resort Residential (ARR) Overlay, the Theme
Park (TP) Overlay, and the Parking (P) Overlay. It
is accompanied by Table 1.7-1, which
summarizes the Development Plan, and Table

1.7-2, which summarizes the existing and
permitted development in the C-R and PR
Districts.

The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-9
As shown in Table 1.7-2, the ARSP permits up to
32,500 hotel rooms or hotel room equivalents
within the C-R District. There are 11,587 hotel
rooms or hotel room equivalents that are currently
developed within the ARSP area. For impact
analysis, commercial uses are converted to hotel
room equivalents on a ratio of 600 square feet of
commercial development to one hotel room.

The PR District includes the 1,712,004 square
foot (sf) Anaheim Convention Center and the
1,600-room Hilton Anaheim hotel. The PR
District allows development of up to 2,158,363
square feet of convention center/meeting space;
100,000 square feet of outdoor programmable
space; 2,500 hotel rooms; and 180,000 square
feet of commercial space.

The TP East Overlay allows development of up to
840,000 square feet of theme park uses allowed
under the DRSP as part of The Disneyland
Resort Project and up to 3,348 hotel rooms,
which are allowed under the Specific Plan. The
TP West Overlay allows development of up to
80,000 square feet of theme park uses permitted
in the DRSP as part of The Disneyland Resort
Project and up to 564 hotel rooms, which are
allowed under the ARSP. Any amount of theme
park square footage constructed in the TP
Overlay would result in an equivalent amount of
potential theme park square footage removed
from the allotment for the DRSP Theme Park
District such that the maximum theme park
square footage in the DRSP Theme Park District,
DRSP Southeast District, and TP Overlay will not
exceed 6,850,000 square feet.

The P Overlay at Manchester Avenue allows
development of a portion of the parking spaces
permitted and allocated to the DRSP Parking
District East Parking Area and up to 1,116 hotel
rooms, which are allowed under the ARSP. The
P Overlay at the northeast corner of Harbor
Boulevard and Ball Road allows development of
up to 5,700 parking spaces and up to 534 hotel
rooms, which are allowed under the ARSP. Any
amount of parking spaces constructed in the P
Overlay at Manchester Avenue would result in an
equivalent amount of potential parking spaces
removed from the allotment for the DRSP
Parking District, East Parking Area.

1.8 Implementing the Specific
Plan
The sketches, diagrams, and plans included in
the ARSP are intended to convey the overall
design intent of the ARSP. As individual
properties are developed, additional site
planning, design review and approval will be
required prior to the issuance of building permits.

In order to convey the design intent of the ARSP,
the trees and other plants shown in sketches and
cross-sections have been drawn to show their
sizes at maturity.

The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-10
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-11
Table 1.8-1 Development Summary
Districts/Rights-of-way Land Use Approximate Acreage
Commercial Recreation (C-R) District
(Development Area 1)
Hotel/motel, restaurant and other visitor-serving
uses
518.5
Public Recreation (PR) District
(Development Area 2)
Anaheim Convention Center, hotels, and
accessory uses

62.8 TOTAL 581.3
Mobile Home Park (MHP) Overlay in
C-R District
Existing mobile homes 31.5
Anaheim Resort Residential (ARR)
Overlay in C-R District
Allows residential uses in conjunction with a fullservice hotel

59.3 Theme Park (TP) Overlay
TP East Overlay
TP West Overlay
Allows theme park uses in conjunction with hotels
and other uses allowed by the C-R District

52.6 5.15
Parking (P) Overlay
Manchester Avenue
Harbor Boulevard/Ball Road
Allows development of a portion of the parking
allocated to the Parking District East Parking Area
of The Disneyland Resort Specific Plan and
limited back-of-house uses in conjunction with
hotels and other uses allowed by the C-R District
Allows development of parking and limited backof-house uses in conjunction with hotels and other uses allowed by the C-R District

14.9 10.7
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-12
Table 1.8-2 Existing and Permitted Development
District Existing
Development
Permitted
Development(1)
Permitted Development
After
DisneylandForward
(1)
C-R District • 11,587 hotel
rooms* • 32,625 hotel rooms
(2)
• 32,625 hotel rooms
Public Recreation (PR)
District
• 1,600 hotel rooms
• 1,712,004 sf
convention center
• 2,500 hotel rooms
• 2,118,363 sf convention
center
• 180,000 sf commercial
development
• 40,000 sf of additional
hotel meeting and
ballroom space
• 100,000 sf outdoor
programmable space
• 2,500 hotel rooms
• 2,118,363 sf convention
center
• 180,000 sf commercial
development
• 40,000 sf of additional hotel
meeting and ballroom
space
• 100,000 sf outdoor
programmable space
Theme Park (TP)
Overlay(3)
TP East Overlay
TP West Overlay
• Temporary surface
parking facilities
(4,635 spaces)
• 489 hotel rooms,
17,619 sf of
ancillary
commercial uses.
• 3,348 hotel rooms
• 564 hotel rooms
• Temporary surface parking
facilities
or
3,348 hotel rooms, 840,000
sf of theme park uses
• 564 hotel rooms,
80,000 sf of theme
park uses
Parking (P) Overlay(4)
Manchester Avenue

• Temporary surface
parking facilities
(1,261 spaces),
approximately
67,424 sf office
building
• 1,116 hotel rooms • Temporary surface parking
facilities (1,261 spaces),
approximately 67,424 sf
office building
or
1,116 hotel rooms,
development of a portion of
the parking spaces
The Anaheim Resort Specific Plan 1.0 Executive Summary
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
1-13
District Existing
Development
Permitted
Development(1)
Permitted Development
After
DisneylandForward
(1)

Harbor Boulevard/
Ball Road
• Surface parking
facilities
(1,324 spaces)
• 534 hotel rooms
allocated to the East
Parking Area of The
Disneyland Resort Specific
Plan
• Temporary surface parking
facilities and (1,324
spaces)
or
534 hotel rooms, 5,700
parking spaces
Notes:
(1) Commercial uses are converted to hotel room equivalents as allowed by Section 7.0 of the Specific Plan, on a ratio of 600 square feet (sf) of commercial development = 1 hotel room. (2) As of adoption of Ordinance No. 6494 approving Amendment No. 16 to the ARSP. (3) The total amount of theme park uses developed in the TP Overlay will reduce the potential amount of theme park uses in the DRSP Theme Park District such that the maximum theme park space footage in the DRSP Theme Park and Southeast Districts and the ARSP TP Overlay shall not exceed 6,850,000 square feet. The amount of restaurant sf in the TP East Overlay shall be further limited to up to 20 percent of the allotted theme park square footage in the Overlay. (4) For any square footage for back-of-house uses or limited retail, dining and entertainment uses, the traffic generation characteristics of said uses shall not exceed those associated with the otherwise permitted hotel/motel (including accessory uses) density as determined by the City Traffic and Transportation Manager prior to approval of building plans. Further, the proposed development shall not result in infrastructure impacts greater than those associated with the property's permitted hotel/motel density, unless such impacts are duly analyzed and mitigated pursuant to subsequent environmental review (such impacts shall be determined through a sewer and traffic impact analysis to be submitted to the City Engineer).

Additional infrastructure studies may be required as determined by the Planning Director.

The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-1

2.0 PLANNING CONTENT

2.1 Purpose of the Specific Plan
The Anaheim Resort, containing theme parks,
convention facilities and visitor-serving uses such
as hotels, is a unique type of land use
concentration that requires special consideration
and attention to ensure that the various elements
come together to create an exciting, attractive
environment. The unique synergy a destination
resort must have is not easily addressed by
traditional zoning. As a result, it is necessary to
establish a basic framework, which provides
planning policies and standards to assure that
visitor-serving facilities and theme park uses will
come together as an integrated whole. The
ARSP is intended to establish this framework,
thereby ensuring an attractive destination resort
environment.

In addition to overall planning policies, the ARSP
establishes comprehensive zoning regulations
and design guidelines, which recognize the
distinctive nature of tourist and conventionoriented uses, and effectively implements the policies of the ARSP. It also identifies the public
facilities and services that will be needed to
support the development and describes how the
project and its related improvements will be
phased.

The zoning regulations contained within this
specific plan in Section 7.0, Zoning and
Development Standards, are regulatory in nature.

Subsequent development plans and subdivision
maps must be consistent with both the ARSP
and the City of Anaheim General Plan. Any
situation or condition not specifically covered by
provisions contained within this specific plan will
be subject to the regulations of the City of
Anaheim Municipal Code.

2.2 Specific Plan Policies
The specific plan goals stated in Section 1.6
define the basis for the following specific plan
policies. They include:
• Enhance the urban destination area and
create a resort development;
• Establish a unified resort identity;
• Supply adequate visitor and convention
facilities to meet the long-term demand for
entertainment, convention, lodging, and retail
uses;
• Improve public facilities, services and
infrastructure to accommodate projected
growth;
• Improve the transportation system;
• Develop implementation measures to assure
that the area will be enhanced by high quality
development; and
• Protect and enhance surrounding uses.

The following subsections describe these policies
in more detail.

2.2.1 Create and Enhance an Urban
Destination Resort Environment
The primary planning policy for the ARSP is to
enhance an urban destination area and create a
resort environment that features the Anaheim
Convention Center, hotels, restaurants, theme
park attractions, and shopping and entertainment
opportunities. By enhancing this area, visitors will
be encouraged to stay for several days, and
enjoy the variety of recreation and entertainment
opportunities available.

2.2.2 Establish a Unified Resort Identity
In order to establish the identity of The Anaheim
Resort as a premiere destination resort, the
ARSP proposes that a unifying theme be
established throughout the ARSP area. This will
The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-2
be achieved by establishing a consistent visual
language for the public areas that extend
throughout the ARSP area. The main
components of the unifying visual language will
be: architectural character and quality of the
buildings, landscape, signage, and street
furnishings.

The architectural character and quality of the
buildings proposed will be regulated through a
combination of setback requirements contained
in Section 7.0, Zoning and Development
Standards, and design guidelines contained in
Section 5.0, Design Plan, of this specific plan.

The landscape character of the ARSP will be
created primarily by extensive planting of trees,
shrubs and ground cover. Similarly, signage
within the ARSP area will present a unified visual
character through the use of compatible and
complimentary colors, forms, and typography.

Street furnishings, including lighting fixtures,
benches, pageantry, and entry statements will
also be selected to reinforce the overall identity
of The Anaheim Resort.

2.2.3 Supply Visitor and Convention
Facilities to Meet Long-Term Demand
Another important specific plan policy is to supply
the visitor and convention facilities that will be
needed to meet the long-term demand for
recreation, convention, and visitor-serving
activities. There are three primary types of
facilities needed to achieve this that are
addressed by this plan: hotels, convention
facilities and visitor-serving retail and
entertainment facilities.
• First, the ARSP provides for the development
of up to 32,625 hotel rooms within the
Commercial Recreation (C-R) District.
• Second, the ARSP provides for the ongoing
operation and expansion of the Anaheim
Convention Center, the largest convention
facility on the West Coast, and uses
supportive of this important facility.
• Third, the ARSP also provides for visitorserving retail and entertainment facilities within the ARSP area.

2.2.4 Improve Public Facilities, Services
and Infrastructure to Accommodate
Growth
Another important specific plan objective is to
improve public facilities, services, and
infrastructure to accommodate the growth and
development that is planned to occur within the
ARSP area. The public facility components to be
improved as a result of the ARSP include: the
transportation infrastructure (described in Section

4.0, Public Facilities Plan), and the pedestrian
environment and the streetscape (described in
Section 5.0, Design Plan). The ARSP is designed
to create an inviting, integrated pedestrian
environment that provides convenient
connections throughout the ARSP area and the
adjacent Disneyland Resort. Important elements
of the pedestrian environment are the
landscaped parkways and pedestrian facilities
that are provided throughout the area. The ARSP
includes streetscape improvements that are
compatible with those in the Disneyland Resort
Specific Plan and which contribute to a unifying
visual character for the entire Anaheim Resort.

Improvements to underground infrastructure,
including the storm drainage, water supply,
electrical and sewerage systems and enhanced
public services are also provided.

2.2.5 Improve the Transportation System
An essential part of the specific plan is to identify
improvements to the transportation system so
that access to the ARSP area will be improved.

These improvements include a combination of
new access routes to and from I-5 and local
roadway improvements.

The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-3
The ARSP area can also be easily accessed by
the Orange County Transportation Authority
(OCTA) bus lines and Anaheim Resort
Transportation, both of which provide
connections from nearby Metrolink/Amtrak and
future high-speed rail stations, including ARTIC
(Anaheim Regional Transportation Intermodal
Center), a multimodal transportation facility.

Day visitors to the ARSP area will have
convenient access to and from two new public
day-use parking facilities (described in more
detail in The Disneyland Resort Specific Plan).

These facilities will have a maximum capacity of
34,300 cars and will accommodate Anaheim
Convention Center, as well as theme park
visitors. Access from the parking facilities to the
Anaheim Convention Center will be by shuttle
bus or via the pedestrian walkway system.

Overnight visitors arriving by I-5 may use the
same interchanges as day visitors but will be
directed to surface streets for access to hotels or
other facilities within The Anaheim Resort.

These facilities will complement those proposed
within the adopted Disneyland Resort Specific
Plan, which includes high-capacity public parking
facilities, pedestrian walkways, transportation
system(s), and pedestrian bridges .

2.2.6 Develop Implementation
Mechanisms to Assure Quality
Development
To assure the overall quality of the ARSP area,
the ARSP contains implementation mechanisms
that promote the design goals of the Plan. These
mechanisms include development regulations,
standards, and design guidelines, as well as a
public facilities plan. Section 5.0, Design Plan,
describes the design concepts that will be
implemented to provide a unified identity. The
City has also adopted an Identity Program for
The Anaheim Resort that has been developed in
conjunction with this specific plan and which is
also described in Section 5.0. The zoning and
development standards are contained within
Section 7 .0, Zoning and Development
Standards. They define the permitted uses and
establish setback standards, among other things.

2.2.7 Enhance and Protect Surrounding
Uses
Implementation of the ARSP will enhance and
protect the surrounding uses through the
following means. First, development setback
areas are created and maintained to provide an
aesthetically appealing, landscaped buffer
between the development in the ARSP area and
neighboring uses. Second, development in the
ARSP will incorporate 360-degree architecture
for Disney ARSP Properties to protect and
improve public views into the Specific Plan area.

Third, convenient access to the public parking
facilities from Interstate 5 minimizes the use of
local streets by visitors to the ARSP area. As a
fully integrated planning document, the ARSP
provides the overall policy direction (in this
Section, Section 3.0, Land Use Plan, and Section

4.0, Public Facilities Plan) as well as the
particular planning tools (Section 5.0, Design
Plan, and Section 7.0, Zoning and Development
Standards) needed to ensure that these goals
are achieved as development of the ARSP area
proceeds.

2.3 Authority and Scope of the
Specific Plan
The City of Anaheim's authority to prepare,
adopt, and implement specific plans is assured
by California Government Code, Article 8
Specific Plans, Section 65450 through Section
65457. Procedures for the adoption,
implementation, and amendment of specific
plans are provided in Chapter 18.72 Specific
Plans, of the Anaheim Municipal Code. The
The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-4
Planning Commission must hold a public hearing
before it can recommend the adoption of a
specific plan by the City Council. The City
Council may then adopt the specific plan by
ordinance.

As required by Chapter 18.72 of the Anaheim
Municipal Code and California Government Code
Sections 65450 et. seq., this document and the
associated environmental impact reports that
have been prepared for the ARSP, Master
Environmental Impact Report No. 313 (MEIR No.
313), Supplemental Environmental Impact Report
No. 340 (SEIR No. 340), and Supplemental
Environmental Impact Report No. 352 (SEIR No.
352) specify the following in detail:
• The nature, location, density and size of all
existing and proposed land uses, including
open space.
• Vehicular and pedestrian circulation within
the project and surrounding area.
• The provision of essential urban services
including, but not limited to, energy, public
safety, public utilities, sewage, solid waste
disposal, storm water drainage, water,
recreation and other essential facilities which
may be needed to support proposed
development.
• Land use and other regulations that will
implement the specific plan.
• Programs, public works projects, and
financing measures to implement the specific
plan.
• A statement of the relationship of the specific
plan to the General Plan.

Chapter 18.72 also requires a development
schedule setting forth phasing of development
and target dates for completion. The ARSP is
intended to provide guidelines and regulations for
the future development of the ARSP area and
does not contain any proposals for specific
developments other than the Public Facilities
Plan. As such, it does not contain a phasing plan,
which establishes a precise sequence, time, and
level of development. Development of the ARSP
area will likely be spread over a number of years
as individual landowners renovate their property,
or replace existing buildings with new ones. SEIR
No. 340 has assumed thresholds of development
for modeling purposes in Year 2030 and contains
mitigation measures to ensure that infrastructure
improvements will be required commensurate
with development. For the DisneylandForward
project, SEIR No. 352 has assumed for purposes
of analysis that Disney would implement the
Project over the next decades depending on
market conditions and contains mitigations
measures to ensure that infrastructure
improvements will be required commensurate
with development.

In addition, this document addresses subjects,
such as urban design, which are necessary and
desirable for implementation of the General Plan.

Further, this document provides information that
specifies how the proposed ARSP is in
conformance with the following findings, which
the Planning Commission and the City Council
are required to make prior to approving or
amending a specific plan:
• That the property proposed for the specific
plan has unique site characteristics such as
topography, location or surroundings which
are enhanced by special land use and
development standards;
• That the specific plan is consistent with the
goals and policies of the General Plan and
with the purposes, standards and land use
guidelines therein;
The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-5
• That the specific plan results in development
of desirable character, which will be
compatible with existing and proposed
development in the surrounding
neighborhood;
• That the specific plan contributes to a
balance of land uses; and,
• That the specific plan respects environmental
and aesthetic resources consistent with
economic realities.

2.4 Relationship to City Planning
Documents and Regulations
This section describes the relationship of the
ARSP to other relevant City planning documents
and regulations.

2.4.1 Relationship to the General Plan
As previously mentioned, the ARSP is consistent
with the goals and policies of the General Plan.

Section 6.0, General Plan Consistency, includes
a discussion of each of the applicable General
Plan Element's goals and policies, and how they
are implemented through the ARSP.

2.4.2 Relationship to the Zoning
Ordinance
The ARSP defines zoning districts, regulations,
and development standards that will apply to the
ARSP area. In cases where the ARSP does not
address a particular situation, the regulations and
development standards contained within Title 18
of the Anaheim Municipal Code will apply. To the
extent the two differ, the ARSP's policies, design
guidelines, regulations, and development
standards will apply.

2.4.3 California Environmental Quality
Act Requirements
The California Environmental Quality Act (CEQA)
requires that local agencies, prior to taking action
on projects over which they have discretionary
approval authority, consider the environmental
consequences of such projects. An
Environmental Impact Report (EIR) is a public
document designed to provide the public,
responsible/trustee agencies, special districts,
and local and State government agency decisionmakers with an analysis of the potential environmental consequences of project
implementation in order to support an informed
decision.

Pursuant to local and State CEQA Guidelines,
the City of Anaheim certified The Anaheim
Resort Specific Plan Master EIR No. 313 (State
Clearinghouse No. 91091062) in support of the
adoption of The Anaheim Resort Specific Plan
No. 92-2 in September 1994. Master EIR No. 313
evaluated impacts associated with the
establishment and implementation of the ARSP
and created a Mitigation Monitoring Program
(MMP No. 0085) in order to mitigate impacts
associated with ARSP area development. Since
being certified in 1994, two Validation Reports
have been prepared (1999 and 2004) to evaluate
the continued relevance and accuracy of Master
EIR No. 313 and its ability to be used as a
Master EIR for all projected development within
the boundaries of the ARSP area. In December
2012, the City certified Supplemental EIR No.
340 to reevaluate all the environmental changes
that have occurred in and around The Anaheim
Resort and to evaluate an expansion of the
Convention Center. Since being certified in 2012,
one Validation Report has been prepared (2019)
to evaluate the continued relevance and
accuracy of SEIR No. 340 and its ability to be
used as a Master EIR for all projected
The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-6
development within the boundaries of the ARSP
area.

In 2021, to allow continued, long-term growth of
The Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. (Disney) proposed
DisneylandForward, an update to The
Disneyland Resort Project (1) to allow the
transfer of uses permitted under the Disneyland
Resort Project to other areas of the DRSP and
Disney ARSP Properties (Disney’s Properties in
the DRSP and Disney ARSP Properties are
collectively referred to as “Disney Property” or
“Disney Properties”) and (2) to provide for future
administrative review by the City of Disney’s
development projects on Disney Properties.

Pursuant to local and State CEQA Guidelines,
the City of Anaheim prepared an Initial Study
which determined that certain potentially
significant environmental impacts might be
associated with development of the
DisneylandForward project. As a result, the City
prepared Subsequent EIR No. 352 (under
separate cover) which identifies impacts which
may result from the development of
DisneylandForward and includes recommended
mitigation measures to lessen these impacts.

The City Council certified the Final Subsequent
EIR No. 352 for DisneylandForward on [insert
date] and created a Mitigation Monitoring
Program (MMP No. 387) in order to mitigate
impacts associated with DisneylandForward
development. SEIR No. 352 also provides the
environmental analysis required for the addition
of theme park uses in the ARSP Theme Park
East and ARSP Theme Park West Overlays and
the additional of parking uses in the ARSP
Parking Overlays. For non-Disney properties
located in the DRSP and the ARSP, EIR No. 311
and SEIR No. 340, including the associated
Mitigation Monitoring Plans, would continue to
apply to future development.

In addition to addressing the potential
environmental impacts that would result from the
ARSP Update and the Anaheim Convention
Center Expansion, Supplemental EIR No. 340
serves as the primary environmental document
for all future entitlements associated with the
ARSP, including all discretionary approvals
requested or required to implement the ARSP.

For the DisneylandForward Project,
Supplemental EIR No. 352 serves as an
additional environmental document for all future
development associated with Disney Properties.

2.4.4 Relationship to The Disneyland
Resort Specific Plan
The City of Anaheim adopted The Disneyland
Resort Specific Plan (Specific Plan No. 92-1) and
certified Environmental Impact Report (EIR) No.
311 on June 29, 1993. The Disneyland Resort
Specific Plan provides for the development of an
international multi-day vacation destination resort
encompassing approximately 489.7 acres of The
Anaheim Resort. The Plan permits the
development of new theme parks, additional
hotels and entertainment areas, new parking
facilities, and an internal transportation system.

In addition, the Plan permits the existing
Disneyland and Disney California Adventure
theme parks to continue to be modified with new
attractions and other improvements.

In 2021, to allow continued, long-term of The
Disneyland Resort, Walt Disney Parks and
Resorts U.S., Inc. proposed DisneylandForward,
an update to The Disneyland Resort Project. The
Disneyland Resort Project included updates to
The Disneyland Resort Specific Plan to allow the
transfer of theme park, hotel and other retail,
dining and entertainment uses, and parking
permitted in The Disneyland Resort Project and
to provide future streamlined review by the City
of Disney’s development projects.

The City Council certified the Final Subsequent
EIR No. 352 for DisneylandForward on [insert
date], which included environmental review for
The Anaheim Resort Specific Plan 2.0 Planning Context
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
2-7
development in the Southeast District as
envisioned by EIR No. 311.

Although they are separate projects, preparation
of the ARSP and The Disneyland Resort Specific
Plan were coordinated to ensure planning consistency, and to ensure that elements of the plans are complementary (for example, definition of
planning area boundaries, the design of the
streetscape improvements and the provision of
adequate infrastructure). Where appropriate,
references or descriptions of the programs
proposed as part of The Disneyland Resort
Specific Plan are included within this document in
order to provide the reader with a better
understanding of the relationship between the
planning concepts and programs proposed as
part of each of the two Specific Plans.

2.4.5 Relationship to the Hotel Circle
Specific Plan
On August 16, 1994, the City of Anaheim
adopted the Hotel Circle Specific Plan (SP 93-1)
for the remaining 6.8 acres of The Anaheim
Resort. This specific plan allows for the
development of up to 969 hotel rooms. All of the
parcels within the specific plan area are
developed with a total of 818 hotel rooms.

The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-1

3.0 LAND USE PLAN

3.1 Regional Location
The Anaheim Resort Specific Plan (ARSP) area
is located in the City of Anaheim, which is 35
miles southeast of downtown Los Angeles and 7
miles northwest of Santa Ana, in Central Orange
County, California. Exhibit 3.1-1 (Regional
Location Map) shows the regional location of the
ARSP area. The ARSP area is generally located
southwest of the I-5 corridor, south of Vermont
Avenue, east of Walnut Avenue, and north of
Chapman Avenue.

Exhibit 3.1-1 Regional Location Map

3.2 Existing Conditions
This Section contains a description of the ARSP
area and other relevant existing conditions.

3.2.1 The Specific Plan Area
The ARSP area is located within The Anaheim
Resort, an area designated by the City of
Anaheim General Plan for recreation and
tourist/convention-related activities along with
related visitor-serving uses. The Anaheim Resort
itself contains approximately 1,078 acres. Exhibit

3.2-1 (ARSP/The Anaheim Resort Boundaries)
shows the location of the ARSP area within The
Anaheim Resort. Harbor Boulevard, West
Street/Disneyland Drive, and Haster Street are
the main north-south thoroughfares through the
project area. Katella Avenue, Ball Road, and
Orangewood Avenue are the main east-west
thoroughfares. I-5 also crosses through the
ARSP area.

3.2.2 Existing Uses
The current uses within the ARSP area include a
variety of commercial, retail, hotel/motel, and
visitor- and convention-serving uses. In addition,
some nonconforming uses such as mobile home
parks, and industrial and office facilities are
located in the ARSP area. The Anaheim
Convention Center is located on the south side of
Katella Avenue, west of Harbor Boulevard.

Residential neighborhoods consisting of singlefamily homes and multiple-family dwelling units are located south and west of the Anaheim
Convention Center and around the periphery of
The Anaheim Resort.

Exhibit 3.2-2 (Aerial Photograph with the ARSP
and Anaheim Resort Boundaries) is an aerial
photograph of The Anaheim Resort. The limits of
ARSP area are also identified.

The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-2
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-3
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-4

3.3 Land Use Plan
This section contains a description of the land
use plan for the ARSP. In particular, it establishes the general policies that will govern land use within the ARSP area. Section 7.0, Zoning
and Development Standards, contains specific,
detailed zoning and development standards,
which are based on the policies described herein.

The land use plan is based on three major
factors that will govern land use within the ARSP
area. For each of these three factors, the ARSP
provides a background rationale for the proposed
land use regulations, as well as a description of
the basic land use policies. They are:
• The land uses permitted in the Commercial
Recreation (C-R) and Public Recreation
(PR) Districts as well as in the Mobilehome
Park (MHP) Overlay, the Anaheim Resort
Residential (ARR) Overlay, the Theme Park
(TP) Overlay, and the Parking (P) Overlay;
• The maximum development density
permitted in the C-R District; and,
• The types of development standards that will
apply to development.

Exhibit 3.3-1 (Development Summary Plan) for
the ARSP, which shows the location of the C-R
and PR Districts, the Central Core, and the MHP,
ARR, TP, and P Overlays. Further information
regarding development densities permitted within
these development areas are depicted on the
maps on the following pages of the Land Use
Plan.

3.3.1 Land Use
As implied in its name, The Anaheim Resort is
intended for land uses with a commercial and/or
recreational emphasis. The presence of the
Anaheim Convention Center, the Disneyland
Theme Park and Disney’s California Adventure
Theme Park has established The Anaheim
Resort as an important regional, as well as
national and international destination. In the
future, other similar attractions may be developed
in The Anaheim Resort. As a result, visitors to
The Anaheim Resort require many types of
goods and services in order to make their visits
safe, convenient and enjoyable.

Among the most common visitor requirements
are food and lodging. Consequently, in the
majority of the 518.5-acre C-R District, hotels,
motels and restaurants are permitted uses. In
addition, many service and retail businesses
intended to accommodate visitors, such as
barber or beauty shops, travel agencies,
automobile rental agencies, and specialty retail
shops, will also be permitted when integrated
within a hotel/motel development. Those uses
which are consistent with the overall intent of the
ARSP, but which may require special consideration in order to assure compatibility with surrounding uses will require conditional use
permits.

The 1.8 million square foot Anaheim Convention
Center, one of the major visitor destinations in
The Anaheim Resort, and the existing 1,600-
room Hilton Anaheim hotel are located in the

62.8-acre PR District (Development Area 2).

Development within the PR District is subject to
the requirements of the PR (Public Recreational)
Zone, which is intended to preserve, regulate,
and control the orderly use of City-owned
properties such as Convention Center complexes
and adjacent private properties. Other related
visitor-serving uses allowed in the District as
accessory uses are concession stands,
restaurants, and shops.

As part of DisneylandForward, which amends
The Disneyland Resort Project, theme park uses
were introduced in the ARSP area within the TP
Overlay. The TP Overlay encompasses
approximately 57.75 acres and accommodates
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-5
up to 920,000 square feet of theme park uses
already approved in the DRSP as part of The
Disneyland Resort Project and up to 3,912 hotel
rooms which are allowed under the Specific Plan.

The intent of the TP West Overlay is to allow
development of theme park uses on ARSP
properties concurrently with the development of
theme park uses in the DRSP Theme Park
District. The intent of the TP East Overlay is to
allow development of theme park uses on ARSP
properties concurrently with the development of
theme park uses in the DRSP Southeast District.

Any amount of theme park square footage
constructed in the TP Overlay will result in an
equivalent amount of potential theme park
square footage removed from the allotment for
the DRSP Theme Park District such that the
maximum theme park square footage in the
DRSP Theme Park District, DRSP Southeast
District, and TP Overlay will not exceed
6,850,000 square feet.

As part of DisneylandForward, the P Overlay was
introduced in the ARSP to permit parking spaces
for theme park uses, a limited amount of back-ofhouse uses such as supporting office space, a limited amount of retail and dining such as kiosks
along pedestrian pathways within the P Overlay,
and up to 1,650 hotel rooms which are allowed
under the Specific Plan. The P Overlay
encompasses 25.57 acres. The P Overlay along
Manchester Avenue north of the East Parking
Area of the DRSP Parking District allows
development of a portion of the number of
parking spaces approved for the East Parking
Area as part of The Disneyland Resort Project.

The intent of the P Overlay is to allow
development of these parking spaces
concurrently with the development of parking
facilities in the East Parking Area. The P Overlay
also allows development of up to 5,700 parking
spaces at the Harbor Boulevard and Ball Road
properties.

Section 7.0, Zoning and Development Standards,
contains a complete list of all the permitted
primary uses, as well as accessory uses,
conditional uses, and prohibited uses.

The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-6
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-7

3.3.2 Commercial Recreation (C-R)
District Development Density
The ARSP establishes seven density
designations in the C-R District (Development
Area 1) that will help assure that development of
the area will be compatible with proposed
infrastructure and with the goal to protect
surrounding residential uses. These density
designations are based upon hotel/motel
development and allow up to 20% of each
hotel/motel project gross square footage,
excluding parking facilities, to be developed with
integrated (i.e., included within the main
hotel/motel complex) accessory uses. These
accessory uses will reduce the otherwise
maximum permitted hotel/motel density at the
rate of one hotel/motel room per six hundred
(600) gross square feet of accessory use. For
properties proposed to be developed with
permitted and conditionally permitted uses other
than hotels/motels with accessory uses, the
traffic generation characteristics of said uses
shall not exceed those associated with the otherwise permitted hotel/motel (including accessory uses) density as determined by the Planning
Director or designee prior to Final Site Plan
review and approval.

The seven density categories established by the
plan are:
• Low Density (up to 50 hotel rooms/acre);
• Low-Medium Density (up to 75 hotel
rooms/acre);
• Low-Medium Density (Modified) (up to 252
hotel rooms and 75,593 square feet of
accessory uses);
• Medium Density (up to 100 hotel
rooms/acre);
• Medium Density (Modified) (up to 345 hotel
rooms);
• Medium Density (Modified A) (up to 127
hotel rooms); and,
• Convention Center Medium Density (up to
125 hotel rooms/acre provided the trip
generation characteristics are equivalent to
100 hotel rooms/acre).

Exhibit 3.3-2 (C-R District Development Density
Plan), identifies the location of each density
designation within the C-R District.

The areas with the Low Density designation are
generally located where planned future
infrastructure improvements will not support more
intense development, or which are located further
from the area’s attractions. Areas with the LowMedium and Medium Density designations are located where planned future infrastructure will
be sufficient to accommodate these more intense
levels of development, and which are located
closer to the main attractions of The Anaheim
Resort. Areas immediately adjacent to the
Anaheim Convention Center have the
Convention Center Medium designation in
recognition that guests at these hotels typically
do not have automobiles and, therefore, place
fewer demands on area streets, one of the most
important infrastructure factors that tend to limit
development density. In addition, the Low
Medium (Modified) density designation allows
252 hotel rooms and 75,593 square feet of
commercial uses, which is equivalent to 378
hotel rooms, at the southeast corner of Katella
Avenue and Harbor Boulevard, the Medium
Density (Modified) density designation allows up
to 345 hotel rooms or its equivalent on South
Manchester Avenue and the Medium Density
(Modified A) density designation allows up to 127
hotel rooms on Clementine Street.

In recognition of the extensive existing
development within The Anaheim Resort, the
ARSP contains provisions, which permit existing
hotels/motels to renovate or rebuild at the density
existing on the date of adoption of the ARSP,
even if the density exceeds the maximum
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-8
permitted by the density category in which the
property is located.

The C-R District also encompasses properties
that have a Mobile Home Park (MHP) Overlay
designation, an Anaheim Resort Residential
(ARR) Overlay designation, a Theme Park (TP)
Overlay designation, and a Parking (P) Overlay
designation.

The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-9
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-10

3.3.3 Mobilehome Park (MHP) Overlay
The C-R District includes three properties on
approximately 31.5 acres, which have a
Mobilehome Park (MHP) Overlay designation.

The MHP Overlay encompasses two existing
mobilehome parks and a recreational vehicle
(RV) Park. The properties within the MHP
Overlay are subject to the requirements set forth
in Chapter 18.26 of the Anaheim Municipal Code,
which provides development standards,
regulations, and procedures to mitigate relocation
problems and adverse effects of displacement
upon mobilehome owners when a park is
converted to another land use. Exhibit 3.3-3
(Mobilehome Park (MHP) Overlay in C-R District)
identifies the parcels that are subject to the MHP
Overlay in the C-R District.

3.3.4 Anaheim Resort Residential (ARR)
Overlay
The Anaheim Resort Residential (ARR) Overlay,
which is located on 59.3 acres within the C-R
District, allows for conditionally permitted
residential uses in conjunction with the
development of a full service hotel having at least
300 hotel rooms and where (i) hotel uses
comprise at least half of the site density, (ii)
residential uses on the site are fully integrated
into the hotel, and (iii) adjacent to public rights-ofway, residential uses are at least two stories or 25 feet above ground level. Exhibit 3.3-4
(Anaheim Resort Residential (ARR) Overlay in
the C-R District) identifies the parcels that are
subject to the ARR Overlay in the C-R District.

3.3.5 Public Recreation (PR) District
Development Density
The 62.8-acre Public Recreation (PR) District
(Development Area 2) encompasses the
Anaheim Convention Center and associated
parking complexes, and the 1,600-room Hilton
Anaheim hotel. Development within the PR
District can include up to 2,158,363 square feet
of convention center/meeting space; 100,000
square feet of outdoor programmable space;
2,500 hotel rooms; and 180,000 square feet of
commercial space. Development within this
district is subject to the requirements of the
Public Recreational (PR) Zone. The purpose of
the PR Zone, which is set forth in Chapter 18.14
(Public and Special-Purpose Zones) of the
Anaheim Municipal Code, is to preserve, regulate
and control the orderly use of City-owned
property and adjacent private property. Exhibit

3.3-5 (Public Recreation (PR) District) identifies
the parcels that are subject to the PR District.

3.3.6 Theme Park (TP) Overlay
The TP Overlay includes the TP East Overlay
and TP West Overlay, which are located within
the C-R District. The TP East Overlay includes
approximately 52.6 acres and currently includes
the Toy Story surface parking lot associated with
The Disneyland Resort. The TP East Overlay
allows development of up to 840,000 square feet
of theme park uses permitted in the DRSP as
part of The Disneyland Resort Project and up to
3,348 hotel rooms, which are allowed under the
ARSP. The TP West Overlay includes
approximately 5.15 acres and currently
encompasses the existing Paradise Pier Hotel
and associated parking structure. The TP West
Overlay allows development of up to 80,000
square feet of theme park uses permitted in the
DRSP as part of The Disneyland Resort Project
and up to 564 hotel rooms, which are allowed
under the ARSP. Exhibit 3.3-6 (Theme Park (TP)
Overlay in the C-R District) identifies the parcels
that are subject to the TP Overlay.

3.3.7 Parking (P) Overlay
The Overlay includes two separate areas, one
along Manchester Avenue, immediately north of
the DRSP Parking District East Parking Area,
and one at the northeast corner of Harbor
Boulevard and Ball Road, both of which are
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-11
located in the C-R District. The P Overlay at
Manchester Avenue includes three properties on
approximately 14.88 acres and allows
development of a portion of the parking spaces
permitted and allocated to the DRSP Parking
District East Parking Area and up to 1,116 hotel
rooms, which are permitted under the ARSP. The
P Overlay at Harbor Boulevard and Ball Road
includes five properties on approximately 10.69
acres and allows up to 5,700 parking spaces and
development of up to 534 hotel rooms, which are
permitted under the ARSP. Exhibit 3.3-7 (Parking
P Overlay in the C-R District) identifies the
parcels that are subject to the P Overlay.

The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-12
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-13
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-14
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-15
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-16
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-17

3.3.8 Central Core Development
Standards
The third factor affecting land use within the
ARSP area are the additional development
standards applied to parcels in the heart, or
Central Core, of The Anaheim Resort. The
Central Core includes parcels with frontage on
Harbor Boulevard between I-5 and Orangewood
Avenue, and all parcels with frontage on Katella
Avenue between Haster Street/Anaheim
Boulevard and Walnut Street. For reasons
described in the next paragraph, the Central
Core requires different standards than does the
periphery, especially with respect to building
massing and provision for pedestrians. The
Central Core is depicted in Exhibit 3.3-8 (Central
Core Plan).

Development on the parcels within the Central
Core has an especially important role to play in
creating an overall image for The Anaheim
Resort. Inasmuch as the Central Core is in close
proximity to The Anaheim Resort's major
attractions, the potential for pedestrian use is
greatest in this area. By making the Central Core
a more interesting area to walk through, the
Central Core development standards will
encourage more people to leave their cars and
walk, thereby improving vehicular traffic flow. The
uses adjacent to these stretches of road within
the ARSP area will also have a stronger visual
impression on the large number of vehicles that
pass through it each day.

Among the differences in development standards
between the Central Core and the periphery are
the following:
• In the Central Core, no parking will be
allowed between the public right-of-way and
the building face, making the Central Core
more visually interesting since the parked
vehicles will be behind the buildings.

Whereas in the periphery, parking is allowed
in front of a building provided said parking is
not within the minimum required setback
from the public right-of-way;
• Buildings in the Central Core will be required
to occupy a minimum of 60% of the frontage
adjacent to the right-of-way (or provide a
solid mass of landscape to achieve the
same effect) in order to create a well-defined
"edge" for the street. No such restrictions will
apply to parcels outside the Central Core;
and,
• Special Landscaped Intersections will be
required at the entrances to The Anaheim
Resort and the center of the Central Core to
create an edge and orient the pedestrian
visually.

These special development standards for the
Central Core are described in Section 7.0,
Zoning and Development Standards. Section 5.0,
Design Plan, also contains guidelines which
distinguish one area from another.

The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-18
The Anaheim Resort Specific Plan 3.0 Land Use Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
3-19

3.4 Non Visitor-Serving Uses
In order to foster the establishment and growth
within The Anaheim Resort of tourist, convention
and entertainment-related industries, such as
theme parks, hotels, motels, vacation ownership
resorts, tourist-oriented retail and entertainment,
restaurants, movie theaters, convention and
conference facilities and other visitor-serving
facilities, and recognizing that the presence of
non-visitor-serving uses in The Anaheim Resort
would be incompatible with this goal, residential
uses may only be permitted in limited areas of
the ARSP area as provided by and in accordance
with the Anaheim Resort Residential (ARR)
Overlay (Anaheim Municipal Code Section

18.116.125) in effect as of March 19, 2007
(conditionally permitted residential uses in
conjunction with the development of a full service
hotel having at least 300 hotel rooms and where
(i) hotel uses comprise at least half of the site
density, (ii) residential uses on the site are fully
integrated into the hotel, and (iii) adjacent to
public rights-of-way, residential uses are at least
two stories or 25 feet above ground level, and
residential uses are also permitted as provided
by and in accordance with the Mobile Home Park
(MHP) Overlay (Anaheim Municipal Code
Chapter 18.26) in effect as of March 19, 2007.

No other residential uses shall be incorporated
into the Commercial Recreation land use
designation and/or allowed within the ARSP area
without (i) completion of an Environmental Impact
Report prepared in accordance with the
requirements of the California Environmental
Quality Act, (ii) completion of a long-term
economic impact analysis of the proposed
change by an independent financial advisor
retained by the City, (iii) approval by the City
Council, and (iv) approval of a majority of voters
of the City of Anaheim at a regularly-scheduled
municipal election.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-1

4.0 PUBLIC FACILITIES PLAN
The Public Facilities Plan contains a description
of the proposed plans for transportation, utilities,
infrastructure, and services for the ARSP area.

The first two subsections describe regional
improvements, which have an impact on the
ARSP area. The improvements described under
each of the remaining sections are intended to
summarize the infrastructure/services needed for
the complete build-out of The Anaheim Resort.

More detailed information concerning the public
facilities is provided in SEIR No. 340 and SEIR
No. 352, which contain detailed maps and
exhibits, including a thorough discussion of the
existing conditions within the ARSP area.

4.1 Regional Circulation
Programs
Currently, several major facilities provide
vehicular access to the ARSP area. They
include: I-5, Katella Avenue, Haster
Street/Anaheim Boulevard, Ball Road, Harbor
Boulevard, Chapman Avenue, and Disney Way.

Secondary roads within the ARSP area include:

Manchester Avenue, Clementine Street,
Orangewood Avenue, Walnut Street, West
Street, and Disneyland Drive. All other streets
within the ARSP area are Local Streets, including
Alro Way, Casa Vista Street, Vermont Avenue,
Wilken Way, and Zeyn Street.

Many roads within the ARSP area have been, or
are anticipated to be improved, in connection
with other local, county, and State circulation
programs. Facilities in this category include:
• I-5, interchanges at West Street/ Disneyland
Drive, Harbor Boulevard/Ball Road, Katella
Avenue/Disney Way/Anaheim Boulevard,
Gene Autry Way, and Orangewood Avenue
have been improved as part of the I-5
widening;
• Katella Avenue has been improved and will
be further widened as part of the Orange
County Smart Street Program; and,
• Several intersections have been identified in
the City’s Planned Roadway Network to
receive additional supplemental turning lanes,
including but not limited to, Harbor Boulevard
and Katella Avenue, Katella Avenue and
Anaheim Boulevard/Haster Street, Harbor
Boulevard and Ball Road, Harbor Boulevard
and Convention Way, and Haster Street and
Gene Autry Way.

Improvements are funded by State and Federal
funds, Orange County's Measure M funds, City
Traffic Impact Fees, as well as other public and
private sources.

As part of DisneylandForward, which amends
The Disneyland Resort Project, previously
contemplated extensions of Gene Autry Way
east of Harbor Boulevard to Haster Street and
Clementine Street from Katella Avenue to
Orangewood Avenue were removed to allow for
application and buildout of the DRSP Southeast
District and the TP East Overlay. From Haster
Street, the existing Gene Autry Way connects to
the I-5 high occupancy vehicle (HOV) lanes and
the Platinum Triangle.

Exhibit 4.1-1 (Vehicular Circulation Plan) shows
the existing circulation system as well as planned
improvements to the existing system described in
the preceding paragraphs. The Transportation
and Traffic Sections of SEIR No. 340 and SEIR
No. 352 also contain detailed information on the
existing circulation system.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-2
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-3

4.2 Regional Infrastructure
Programs
The Anaheim Resort is located in an area that
has been served by public utilities and facilities
for many years. As part of ongoing efforts to
improve the City's infrastructure, new facilities
have been installed within the ARSP area, are
currently planned, or are underway. Some of
these (such as improvements to the regional
sewage treatment facilities) are planned to
proceed regardless of the activity in the ARSP
area. Among the projects currently proposed are:
• Enlargement of sewers, or parallel lines to
handle increased flows;
• A new water transmission main and a new
water well to supply increased demand;
• Construction of a new electrical substation
facility;
• Upgrades to existing and construction of new
storm drain facilities; and
• New larger water mains (16” in Harbor Blvd.
from Orangewood Ave. to Chapman Ave.)
and a new well to supply increased demand.

These projects are discussed in greater detail in
SEIR No. 340.

4.3 Vehicular Circulation Plan for
the Anaheim Resort
Convenient automobile access to The Anaheim
Resort is an essential component to the success
of the area. Most visitors will come to The
Anaheim Resort by automobile or bus, and it is
especially important that the visitors' experience
be pleasant upon both arrival and departure.

In connection with The Disneyland Resort,
several improvements to the area wide
circulation system have been implemented.

These improvements are more fully described in
The Disneyland Resort Specific Plan. The
following is a discussion of the circulation
improvements completed or proposed for The
Anaheim Resort including those improvements
completed as part of The Disneyland Resort
Specific Plan.

4.3.1 Connections to Interstate 5 (I-5)
Convenient connections from I-5 to the proposed
public parking facilities in The Disneyland Resort
have been implemented. Approximately 70% of
the visitors to The Disneyland Resort arrive on I5. Moving them on and off I-5 safely and efficiently is accomplished in a variety of ways.

During the early stage of implementation of The
Disneyland Resort Specific Plan, a new mixed
flow off-ramp was constructed at the Disneyland
Drive exit north of Ball Road. This permits
southbound traffic to exit to Disneyland Drive and
then onto a ramp that provides a direct link to the
public parking facility in the West Parking Area of
The Disneyland Resort Specific Plan Parking
District.

When the traffic leaving the parking facilities in
The Disneyland Resort exceeds the traffic
entering these facilities, the lanes leading into the
parking facilities and crossing over Ball Road are
reversed, permitting visitors to exit conveniently
onto I-5. Generally, the lanes are used for
inbound traffic in the morning and for outbound
traffic in the afternoon and evening. Use of the
interchange by those not visiting The Disneyland
Resort and/or not in a HOV, have also been
accommodated.

A similar system permits visitors arriving from the
south to exit the HOV lane on a ramp that travels
under the elevated portion of I-5 directly to
Disney Way and provides convenient access to
uses located in the east part of the ARSP area.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-4
This system keeps The Anaheim Resort traffic
from congesting traffic on Katella Avenue.

Existing access patterns to surrounding
properties have generally been maintained,
except that West Street was made into a cul-desac south of Ball Road and renamed West Place.

In addition, Cerritos Avenue has been relocated
approximately 1,000 feet north of its previous
location. The relocated street section is named
Magic Way and was constructed when West
Street was realigned south of Ball Road.

4.4 Anaheim Resort Arterial/
Secondary System
One of the important objectives of the ARSP is to
minimize traffic impacts on surrounding arterial
and secondary streets. The system of
connections to I-5 that lead conveniently to area
uses contributes significantly to this objective. In
addition, improvements that have been
completed since the 1994 adoption of the ARSP
or are proposed to be made to the local streets
will enhance the overall vehicular circulation
within The Anaheim Resort. The street cross
sections described in this Section are typical midblock sections. They are not intended to depict every condition which may exist in the ARSP
area. Additionally, more detailed information
about street rights-of-way can be found in the
Design Plan. They are subject to variation at
intersections and at other locations as
determined by the City Engineer.

Exhibit 4.1-1 (Vehicular Circulation Plan) shows
the location of the major roads and streets within
the ARSP area. The specific improvements
proposed for each street are discussed on the
following pages. Exhibit 4.4-1 (Cross Section
Street Segments) depicts the segments of the
designated road cross sections, which
correspond to the proposed improvements
described for the following major roads and
streets:
• Disneyland Drive (Exhibits 4.4-1 and 4.4-2);
• West Street (Exhibit 4.4-3);
• West Place (Exhibit 4.4-4);
• Disney Way (Exhibit 4.4-5);
• Katella Avenue (Exhibits 4.4-6 to 4.4-7);
• Walnut Street (Exhibit 4.4-8);
• Harbor Boulevard (Exhibits 4.4-9 to 4.4-12);
• Ball Road (Exhibits 4.4-13 to 4.4-15);
• Clementine Street (Exhibit 4.4-16);
• Haster Street/Anaheim Boulevard
(Exhibit 4.4-17);
• Convention Way (Exhibit 4.4-18);
• Gene Autry Way (Exhibits to 4.4-19;
• Manchester Avenue
(Exhibits 4.4-20 to 4.4-23);
• Orangewood Avenue (Exhibit 4.4-24);
• Chapman Avenue (Exhibit 4.4-25);
• Alro Way (Exhibit 4.4-26);
• Casa Vista Street (Exhibit 4.4-27);
• Vermont Avenue (Exhibit 4.4-28);
• Wilken Way (Exhibit 4.4-29); and,
• Zeyn Street (Exhibit 4.4-30).

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-5
As a part of DisneylandForward, the planned
extensions of Clementine Street south of Katella
Avenue and Gene Autry Way between Harbor
Boulevard and Haster Street were removed from
the Circulation Element of the City of Anaheim
General Plan and the Specific Plan. For that
reason, the previous Cross-Sections 18
(Clementine Street, south of Katella) and 21
(Gene Autry Way between Harbor and Haster)
were removed from Exhibit 4.4-1 (Cross-Section
Street Segments).

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-6
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-7
Disneyland Drive between I-5 and Katella
Avenue serves both The Disneyland Resort and
uses within the ARSP area such as the Anaheim
Convention Center.

Disneyland Drive is connected to I-5 with an
interchange. Between I-5 and Ball Road,
Disneyland Drive accommodates traffic arriving
or departing from The Anaheim Resort, including
the public parking facilities in The Disneyland
Resort, the Anaheim Convention Center and
area hotels. Exhibit 4.4-1 (Disneyland Drive
(North of Ball Road) Cross Section), shows the
typical right-of-way, parkways, sidewalks and
travel lanes for this portion of Disneyland Drive.

Exhibit 4.4-1 Disneyland Drive (North of
Ball Road) Cross Section
5-foot sidewalk 5-foot sidewalk
8-foot parkway 8-foot parkway
36 feet min 36 feet min 13 ft
Right-of-way: 98 ft min
13 ft
3 travel lanes,
typical
3 travel lanes,
typical
At Ball Road, traffic on Disneyland Drive may
either go over Ball Road directly to and from The
Disneyland Resort parking facilities via a two
lane overpass with reversible lanes or through
the Ball Road intersection. Traffic bound for other
destinations has full access to Ball Road. South
of the Ball Road intersection, Disneyland Drive
has two basic cross section conditions.

The first cross section is described and depicted
in The Disneyland Resort Specific Plan and
applies to the portion of Disneyland Drive located
south of Ball Road up to the entry to The
Disneyland Resort parking facilities.

The second cross-section applies to the portion
of Disneyland Drive located south of The
Disneyland Resort parking facilities to Katella
Avenue. This cross-section is depicted in Exhibit

4.4-2 (Disneyland Drive (Between 825 feet n/o
Katella Avenue and 1,350 feet n/o Katella
Avenue)). This portion of Disneyland Drive
provides access to hotels and other uses within
The Anaheim Resort. The cross-section depicts
two northbound and two southbound lanes of
traffic separated by a raised landscaped median.

Right and left-turn lanes have been installed in
some locations to improve traffic flow.

Exhibit 4.4-2 Disneyland Drive (Between
825 feet n/o Katella Avenue and 1,350 feet
n/o Katella Avenue) Cross Section
8-foot sidewalk 8-foot sidewalk
8-foot parkway 8-foot parkway
15 ft 24 ft
Right-of-way: 95 ft min
2 travel
lanes
16 ft 24 ft 16 ft
Landscaped
median
2 travel
lanes
West Street is a continuation of Disneyland
Drive, south of Katella Avenue. Supplemental
turning lanes have been added to Disneyland
Drive/West Street at the intersection of Katella
Avenue to facilitate traffic flow. South of this
intersection (approximately 600 feet south of the
intersection with Katella Avenue), the right-ofway and roadway accommodates two lanes of travel in each direction. Exhibit 4.4-3 (West
Street (South of Katella Avenue) Cross Section)
shows the current configuration of this portion of
West Street.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-8
Exhibit 4.4-3 West Street (South of Katella
Avenue) Cross Section
5-foot sidewalk 5-foot sidewalk
8-foot parkway 8-foot parkway
32 ft 32 ft
Right-of-way: 90 ft min
typical typical
13 ft 13 ft
2 travel lanes, 2 travel lanes,
West Place is a cul-de-sac, located
immediately south of its intersection with Ball
Road and depicted in Exhibit 4.4f (West Place
Cross Section).

Exhibit 4.4-4 West Place Cross Section
10-foot parkway 10-foot parkway
4-foot parkway 4-foot parkway
14-34 ft
Minimum one travel
0-20 foot lane each direction
parkway
52 ft
0-20 foot
parkway
Minimum right-of-way: 100-120 ft
14-34 ft
Disney Way between Anaheim Boulevard and
Harbor Boulevard has two to three travel lanes in
each direction, except at Anaheim Boulevard
and Clementine Street where the street has been
widened to provide supplemental turning lanes.

Classified as a Primary Arterial, Disney Way
serves the traffic entering and leaving the east
portion of The Anaheim Resort and the public
parking facility located in the Parking Overlay and
the East Parking Area of The Disneyland Resort
Specific Plan. The portion of Disney Way west of
Clementine Street is described in The Disneyland
Resort Specific Plan. East of Clementine Street,
a landscaped median will ultimately be
constructed, as illustrated in Exhibit 4.4-6 (Disney
Way (East of Clementine Street) Cross Section).

Concurrent with the adoption of Amendment No.
17 (DisneylandForward) to the Specific Plan, the
City adopted a General Plan Amendment which
reclassified Disney Way between Anaheim
Boulevard and Harbor Boulevard from a six-lane
Major Arterial to a four-lane Primary Arterial (with
no change to the width of the ultimate public
right-of-way). This allows Disney Way to be
reduced from three to two through travel lanes
between Anaheim Boulevard and Harbor
Boulevard.

As part of DisneylandForward, the eastbound
travel lanes for Disney Way east of Clementine
Street will be modified to provide an exit
ramp/flyover from the public parking facility
located within the East Parking Area of the
Disneyland Resort Specific Plan Parking District.

With the approval of DisneylandForward, the
following roadway improvements associated with
the East Parking Facility within the Disneyland
Resort Specific Plan will occur within the ARSP:
• Reconfiguration of Disney Way/Clementine
Street to accommodate the East Parking
Area parking facility exit ramp/flyover;
• Disney Way/Clementine Street intersection
improvements to accommodate the East
Parking Area parking facility exit ramp;
• Reconfiguration of the west side of
Manchester Avenue, north of Disney Way to
accommodate a Class I bicycle facility.

Exhibit 4.4-5 Disney Way (East of
Clementine Street) Cross Section
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-9
Katella Avenue has three to four travel lanes
in each direction within The Anaheim Resort.

Eastbound and westbound Katella Avenue
include right-turn lanes and double left-turn lanes
at most intersections, as well as a raised
landscaped median, which separates opposing
traffic between signalized intersections.

Katella Avenue ultimately will be widened to four
lanes in each direction east of West
Street/Disneyland Drive, as shown in Exhibit 4.4-
6 (Ultimate Katella Avenue (Between Interstate 5
and West Street/Disneyland Drive) Cross
Section). These exhibits show the location of the
ultimate right-of-way as well as the interim
condition. Katella Avenue is currently four lanes
westbound from Manchester Avenue to 600 feet
west of Clementine Street. Katella Avenue
between Walnut Street and West
Street/Disneyland Drive will continue to have
three travel lanes in each direction, with a
minimum 15 foot wide landscaped median.

Exhibit 4.4-7 (Ultimate Katella Avenue (Between
Walnut Street and West Street/Disneyland Drive)
Cross Section), shows the ultimate of Katella
Avenue between West Street/Disneyland Drive
and Walnut Street.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-10
Exhibit 4.4-6 Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland Drive) Cross Section
Ultimate right-of-way Ultimate right-of-way
8-foot landscaped parkway 8-foot landscaped parkway
8-foot sidewalk 8-foot sidewalk
8-foot landscaped 8-foot landscaped
parkway parkway
4 travel lanes 4 travel lanes
Right-of-way: 164-166 ft
24 ft 46 ft 24-26 ft 46 ft 24 ft
Landscaped
median
Exhibit 4.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland Drive) Cross Section
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-11
Walnut Street carries two lanes of traffic in
each direction between Katella Avenue and Ball
Road with a raised median. The portion of
Walnut Street south of Goodhue Avenue is
described in the Disneyland Report Specific Plan.

North of Goodhue Avenue, the cross section is
depicted in Exhibit 4.4-8 (Walnut Street (Between
Ball Road and Goodhue Avenue) Cross Section).

Consistent with the City’s Bicycle Master Plan, a
Class I bicycle facility will be installed within
and/or adjacent to the existing ultimate right-ofway on the east side of the street. These improvements will be installed consistent with the
City standards, as determined by the City
Engineer.

Exhibit 4.4-8 Walnut Street (Between Ball
Road and Goodhue Avenue) Cross
Section
Harbor Boulevard. Within the ARSP area,
south of I-5, Harbor Boulevard is a six-lane
divided road except at Manchester Avenue,
Disney Way, Katella Avenue, Convention Way,
Orangewood Avenue, and Chapman Avenue,
where it has been widened to accommodate
additional right- and left-turn lanes.

Exhibit 4.4-9 (Harbor Boulevard (Between
Chapman Avenue and Orangewood Avenue)
Cross Section) reflects the ultimate condition of
this section of Harbor Boulevard. A landscaped
median will ultimately be constructed. The cross
section in the exhibit below does not apply for the
portion of Harbor Boulevard located within the
City of Garden Grove, south of Wilken Way.

Exhibit 4.4-9 Harbor Boulevard (Between
Chapman Avenue and Orangewood
Avenue) Cross Section
Median and travel lanes vary in width to a curb to curb width of 94 feet.

Exhibit 4.4-10 (Harbor Boulevard (Orangewood
Avenue to Manchester Avenue on the East Side
and Orangewood Avenue to 150-250 Feet South
of Manchester Avenue on the West Side) Cross
Section) shows the typical Harbor Boulevard
cross section which applies between
Orangewood Avenue and a point approximately
150-250 feet south of Manchester Avenue on the
west side and to Manchester Avenue on the east
side.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-12
Exhibit 4.4-10 Harbor Boulevard
(Orangewood Avenue to Manchester
Avenue on the East Side and
Orangewood Avenue to 150-250 Feet
South of Manchester Avenue on the West
Side) Cross Section
Exhibit 4.4-11 (Harbor Boulevard (Between
Manchester Avenue on the East Side and 150-
250 feet South of Manchester Avenue on the
West Side to the Interstate 5 Interchange) Cross
Section) applies to Harbor Boulevard between
Manchester Avenue on the East Side and 150-
250 feet south of Manchester Avenue on the
west side to the I-5 interchange, the Harbor
Boulevard right-of-way. This portion of Harbor
Boulevard narrows to transition to the Harbor
Boulevard overpass, which is raised above I-5.

Exhibit 4.4-11 Harbor Boulevard (Between
Manchester Avenue on the East Side and
150-250 feet South of Manchester Avenue
on the West Side to the Interstate 5
Interchange) Cross Section
9-foot parkway/ 9-foot parkway/
sidewalk sidewalk
Minimum 3 travel lanes Minimum 3 travel lanes
Landscaped
median
Right-of-way varies: 102-108 ft minimum
6-9 ft 35 ft min 20 ft min 35 ft min 6-9 ft
North of I-5, Harbor Boulevard has a raised
median and six lanes of travel except at Ball
Road and I-5 where it has been widened to
accommodate additional through, right- and leftlanes. The parkway consists of a 9-foot sidewalk with cutouts for tree wells.

Exhibit 4.4-12 Harbor Boulevard
(Interstate 5 to Vermont Avenue) Cross
Section
9-foot sidewalk 9-foot sidewalk
Tree wells Tree well
9 ft
Ultimate Right-of-way: 120 ft
9 ft 43 ft 16 ft min 43 ft
Minimum 3 travel lanes Minimum 3 travel lanes
Landscaped
median
Ball Road is six lanes, except at West Street/
Disneyland Drive, Cast Place and Harbor
Boulevard, where it is wider to accommodate
additional through right- and left-turn lanes. Ball
Road has landscape medians, with the exception
of between West Place and Cast Place where it
has painted medians. Currently, the right-of-way
varies from 103 to 120 feet. The ultimate right-ofway west of West Place will be 120 feet, and the ultimate right-of-way between West Place and
Cast Place and east of Cast Place will continue
to be 106 feet as designated in the General Plan.

As part of a City-led update to the Circulation
Element of the General Plan in 2017, Class II
bicycle lanes were added to Ball Road, as
reflected in Exhibits 4.4-13 through 4.4-15.

Exhibit 4.4-13 Ball Road (With
Landscaped Median West of West Place)
Cross Section
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-13
Exhibit 4.4-14 Ball Road (Between West
Place and Cast Place) Cross Section
Exhibit 4.4-15 Ball Road (East of Cast
Place) Cross Section
Clementine Street serves two lanes of travel in
each direction and is 87 feet to accommodate a
landscaped median. Concurrent with the
adoption of Amendment No. 17
(DisneylandForward) to the ARSP, the City
adopted a General Plan Amendment to remove
the planned future extension of Clementine
Street between Katella Avenue and Orangewood
Avenue in the south.

Prior to DisneylandForward, the Disneyland
Resort Specific Plan contemplated transit
improvements within the median for the segment
of Clementine Street between Disney Way and
Katella Avenue. As transit improvements within
the median are not contemplated as part of
DisneylandForward, all improvements to this
street were completed prior to
DisneylandForward. All street improvements to
this street were completed prior to Phase IV, with
the exception of potential future transit
improvements (i.e., bus or other improvements)
as approved by the City.

As part of Amendment No. 17
(DisneylandForward) to the ARSP, improvements
to Clementine Street will include the replacement
of the existing sidewalk on the west side of
Clementine Street between Disney Way and Alro
Way with a multi-use Class I bicycle facility. The
adjacent property owner(s) will dedicate the
required property to the City to allow for the
minimum, adequate horizontal width for the multiuse Class I bicycle facility. Improvements associated with DisneylandForward may also
include a traffic signal at Arlo Way. The timing for
installation of these improvements is identified in
Mitigation Monitoring Plan No. 387, associated
with DisneylandForward.

Exhibit 4.4-16 Clementine Street Cross
Section
Haster Street/Anaheim Boulevard includes
three travel lanes in each direction with a 16-foot
wide raised median north of Katella Avenue.

South of Katella Avenue, there are two travel
lanes in each direction with a 12-foot wide
painted median. At the street’s intersection with
Katella Avenue, the street is wider to
accommodate turning lanes. The ultimate
condition for Haster Street, south of Katella
Avenue is six lanes with a 16-foot wide
landscaped median, consistent with its
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-14
designation as a Primary Arterial Highway in the
Circulation Element of the City’s General Plan
and the current street configuration north of
Katella Avenue. Improvements to the west side
of Haster Street, south of Katella Avenue to the
southern boundary of the Disneyland Resort
Specific Plan were completed. The remaining
improvements on the east side of Haster Street
are in ARSP area and will be completed as new
development occurs. As part of
DisneylandForward, improvements to Haster
Street may include a potential left-turn lane on
northbound Haster Street and a potential rightturn lane on southbound Haster Street into and out of the Southeast District of the Disneyland
Resort Specific Plan and a potential traffic signal.

The timing for installation of these improvements
is identified in Mitigation Monitoring Plan No.387.

At Gene Autry Way, Haster Street will also be
widened to accommodate additional turning
lanes. In addition, consistent with the City’s
Bicycle Master Plan, a Class II bicycle facility will
be installed within the existing street right-of-way.

These improvements will be installed consistent
with the City standards, as determined by the
City Engineer.

Exhibit 4.4-17 Haster Street/Anaheim
Boulevard Cross Section
Convention Way will continue to serve the
Anaheim Convention Center in its current rightof-way width of 110 feet as depicted in Exhibit

4.4-20 (Convention Way Cross Section). An 18-
foot wide landscape median is provided except
where left-turn lanes reduce the median to 8 feet.

Three travel lanes are provided in each direction
and a 10-foot wide sidewalk area. The sidewalk
has 4-foot wide landscaped cutouts at the back
of the sidewalk.

Exhibit 4.4-18 Convention Way Cross
Section
4-foot planting areas 4-foot planting areas
10-foot sidewalk 10-foot sidewalk
10 ft
Right-of-way: 110 ft
Landscaped
median
3 travel lanes 3 travel lanes
10 ft 36 ft 18 ft 36 ft
The western portion of Convention Way is
currently improved with the Anaheim Convention
Center Grand Plaza no typical cross section
exists at this time.

Gene Autry Way. Concurrent with the adoption
of Amendment No. 17 (DisneylandForward) to
the ARSP, the City adopted a General Plan
Amendment to remove the planned future
extension of Gene Autry Way between Harbor
Boulevard and Haster Street as a primary arterial
roadway on the Circulation Element. As a result,
Gene Autry Way will not be constructed between
Harbor Boulevard and Haster Street.

Between Haster Street and I-5, Gene Autry Way
transitions to the HOV interchange
accommodating vehicles from the HOV lanes on
I-5. This interchange is elevated and sound walls
have also been constructed in this location.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-15
Exhibit 4.4-19 Gene Autry Way (East of
Haster Street) Cross Section
Manchester Avenue is divided into three
parts: West Manchester Avenue (extends in an
east-west direction from Harbor Boulevard);
North Manchester Avenue (extends in a
southeastern direction from West Manchester
Avenue adjacent to I-5 to Clementine Street);
and, Manchester Avenue, south of Katella
(extends in a southeastern direction adjacent to I5, east of Disney Way to the southern boundary of The Anaheim Resort.

West Manchester Avenue will retain its current
right-of-way and parkway/sidewalk configuration,
as depicted in Exhibit 4.4-22 (Manchester
Avenue Cross Section).

Exhibit 4.4-20 West Manchester Avenue
Cross Section
5-foot sidewalk 5-foot sidewalk

8.5-foot parkway 8.5-foot parkway
Landscaped
median
2 travel lanes 2 travel lanes
24 ft 15 ft 24 ft 13.5 ft
Right-of-way: 90 ft

13.5 ft
North Manchester Avenue is the portion of
Manchester Avenue located adjacent to I-5 that
was relocated as part of the widening of the
freeway and improvements for the interchange at
Katella Avenue and I-5. The ultimate
configuration for this portion of Manchester
Avenue, which occurs adjacent to I-5, is depicted
in Exhibit 4.4-21 (North Manchester Avenue
(Adjacent to Interstate 5, North of the Parking
Overlay) Cross Section). As part of
DisneylandForward, a transportation facility may
be located within the P Overlay adjacent to North
Manchester Avenue. To enhance access to the
transportation facility, North Manchester Avenue
would be widened up to five lanes in front of the
transportation facility to provide a two-way left
turn lane, and may include a landscaped median,
as shown in Exhibit 4.4-22 (North Manchester
Avenue (Adjacent to Interstate 5 and the Parking
Overlay North of Arlo Way) Cross Section).

In addition, consistent with the City’s Bicycle
Master Plan, a Class I bicycle facility will be
installed partially within the existing street rightof-way. As part of DisneylandForward, an additional 4 feet was added to the existing street
right-of-way to accommodate the Class I bicycle
facility on the west side of Manchester Avenue
from the proposed Bus Shuttle Drop-Off Area to
the East Parking Area of The Disneyland Resort
Specific Plan. These improvements will be
installed consistent with the City standards, as
determined by the City Engineer.

Exhibit 4.4-21 North Manchester Avenue
(Adjacent to Interstate 5, North of the
Parking Overlay) Cross Section
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-16
Exhibit 4.4-22 North Manchester Avenue
(Adjacent to Interstate 5 and the Parking
Overlay, North of Alro Way) Cross Section
Manchester Avenue, south of Katella Avenue
(Adjacent to Interstate 5, east of Disney Way)
became a one-way (traveling south) frontage
road adjacent to I-5 as part of the widening of I-5.

There are three lanes of travel as depicted in
Exhibit 4.4-23 (Manchester Avenue, East of
Anaheim Boulevard (Adjacent to Interstate 5)
Cross Section.

Exhibit 4.4-23 Manchester Avenue, East of
Anaheim Boulevard (Adjacent to
Interstate 5) Cross Section
4-foot sidewalk 5-foot parkway
6-foot parkway
(in one direction)
Minimum 3 travel lanes
Right-of-way: Minimum 52 ft
10 ft Minimum 37 ft 5 ft
Orangewood Avenue is designated as
Secondary Arterial with four travel lanes except
at Harbor Boulevard where Orangewood Avenue
will be widened to accommodate additional leftand right-turn lanes.

Exhibit 4.4-24 Orangewood Avenue Cross
Section
5-foot sidewalk 5-foot sidewalk
5-foot parkway 5-foot parkway
Travel lanes vary
10 ft 35 ft 35 ft 10 ft
Right-of-way: 90 ft
Chapman Avenue is a Primary Arterial with six
travel lanes and a landscaped median. At
Harbor Boulevard, Chapman Avenue will be
widened to accommodate additional left- and
right-turn lanes.

Exhibit 4.4-25 Chapman Avenue Cross
Section
4-foot sidewalk 4-foot sidewalk
6-foot parkway 6-foot parkway
16 ft
Landscaped
median
3 travel lanes, typical 3 travel lanes, typical
Ultimate Right-of-way: 106 ft
10 ft 35 ft 35 ft 10 ft
Alro Way has two travel lanes, a 4-foot wide
sidewalk and a 6-foot wide parkway within its 60-
foot right-of-way and is designated as a Local
Street, as depicted below.

Exhibit 4.4-26 Alro Way Cross Section
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-17
Casa Vista Street has one travel lane in each
direction and a 4-foot wide sidewalk with a 6-foot
wide parkway within its 60-foot wide right-of-way
and is designated as a Local Street, as depicted
below.

Exhibit 4.4-27 Casa Vista Street Cross
Section
4-foot sidewalk 4-foot sidewalk
6-foot parkway 6-foot parkway
Right-of-way: 60 ft
1 travel lane each direction
10 ft 40 ft 10 ft
Vermont Avenue has one travel land in each
direction and 9-foot wide sidewalks with 5-foot
wide tree wells within its 66-foot wide right-of-way
and is designated as a Local Street. The exhibit
below shows the Vermont Avenue cross section
condition.

Exhibit 4.4-28 Vermont Avenue Cross
Section
9-foot sidewalk 9-foot sidewalk
5-foot tree well 5-foot tree well
Right-of-way: 66 ft
1 travel lane each direction
9 ft 48 ft 9 ft
Wilken Way has one travel lane in each
direction, 4-foot wide sidewalks and 6-foot wide
parkways within a 60-foot wide right-of-way and
is designated as a Local Street. The exhibit
below shows the Wilken Way cross section
condition.

Exhibit 4.4-29 Wilken Way Cross Section
4-foot sidewalk 4-foot sidewalk
6-foot parkway 6-foot parkway
Right-of-way: 60 ft
1 travel lane each direction
10 ft 40 ft 10 ft
Zeyn Street has one travel lane in each
direction, 4-foot wide sidewalks and 6-foot wide
parkways within a 60-foot wide right-of way and
is designated as a Local Street. The exhibit
below shows the Zeyn Street cross section
condition.

Exhibit 4.4-30 Zeyn Street Cross Section
4-foot sidewalk 4-foot sidewalk
6-foot parkway 6-foot parkway
Right-of-way: 60 ft
1 travel lane each direction
10 ft 40 ft 10 ft
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-18

4.5 Transit Plans
To minimize automobile traffic on local streets,
existing and proposed transit systems will service
uses within the ARSP area. The main component
of the existing system is the Orange County
Transit Authority (OCTA) bus service to the
ARSP area. Current bus routes are located on
Harbor Boulevard, Katella Avenue and Ball
Road, and provide regular service to The
Anaheim Resort.

4.5.1 The Disneyland Resort
The Disneyland Resort Specific Plan transports
theme park visitors to the theme parks from
public day-use parking facilities via pedestrian
walkways, buses, tram services and monorail.

These existing services could be expanded in the
future to provide additional transit improvements.

4.5.2 East-West Transit Connection
An East-West Transit Connection is
contemplated to connect The Anaheim Resort
and the Anaheim Regional Transportation
Intermodal Center (ARTIC).

4.5.3 HOV Lane System
OCTA and Caltrans have developed a plan to
construct a countywide system of transit ways
and commuter HOV lanes in freeway corridors.

These facilities will be used by regional 'express'
buses, regular intercity buses, shuttle buses,
vanpools, and carpools. Buses and other HOVs
would access or egress these facilities at
exclusive HOV ramps to streets or at designated
at-grade merge locations along freeways.

HOV lanes have been constructed on I-5, State
Route (SR) 57, and SR 22, with a direct HOV
connection between SR-57 and I-5. The HOV
interchange at Gene Autry Way allows access to
and from areas east and west of I-5, including
The Anaheim Resort and Angel Stadium of
Anaheim. As part of a long-term project,
exclusive HOV ramps have been identified at
Cerritos Avenue on the SR-57.

4.5.4 Bus Service
OCTA and Anaheim Transportation
Network/Anaheim Resort Transit provide bus
service to and within The Anaheim Resort.

4.5.5 Intercity Commuter Rail Service
Amtrak and Metrolink provide train service to The
Anaheim Resort via stations in Fullerton and
Anaheim.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-19

4.6 Pedestrian Circulation Plans
An increase in the number of hotel rooms and the
development of new attractions will increase
pedestrian activity in The Anaheim Resort. This
will enhance the urban character of the area and
will require that facilities be enhanced to meet the
needs of these pedestrians.

Exhibit 4.6-1 (Proposed Pedestrian Circulation)
illustrates the pedestrian circulation system within
the ARSP area and the surrounding areas. On
this plan, public pedestrian routes have been
identified. The primary destinations of
pedestrians within The Anaheim Resort will
include:
• Hotels, restaurants and other businesses in
The Anaheim Resort;
• The Anaheim Convention Center;
• The existing Disneyland theme park, Disney’s
California Adventure theme park, as
described in The Disneyland Resort Specific
Plan and in the Theme Park (TP) East and
West Overlays of the ARSP area; and
• The East and West Parking Areas of The
Disneyland Resort Specific Plan Parking
District.

Exhibit 4.6-2 (Pedestrian and Vehicular Access
Points) depicts the pedestrian and vehicular
access points, associated with
DisneylandForward, within the ARSP Theme
Park East and Parking Overlays. This exhibit
also describes the locations of existing and
potential bridges. Areas where pedestrian
bridges may be installed serve as a key
connector over public street rights-of-way,
connecting users from one side of the street to
the other without having to impede traffic flow.

Pedestrian bridges were constructed over
Disneyland Drive and Magic Way in the DRSP.

Up to two additional pedestrian bridges or
crossings will be constructed over Disneyland
Drive as part of DisneylandForward. At least one
and up to three pedestrian bridges will be
constructed over Harbor Boulevard, at least one
of which will be constructed in conjunction with
construction of a parking facility within the
Parking Overlay and/or the DRSP East Parking
Area. Exhibit 4.6-2 (Pedestrian and Vehicular
Access Points) also describes the potential future
pedestrian bridge over Katella Avenue
connecting the DRSP Theme Park District to the
PR District. Any pedestrian bridges constructed
over public right-of-way will be required to obtain
an encroachment license from the City.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-20
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-21
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-22

4.7 Water
The City of Anaheim Public Utilities Department
provides water to the ARSP area. Its sources
include both wells to tap groundwater resources,
and water purchased from the Metropolitan
Water District. Based on preliminary estimates,
the average additional daily water consumption
for The Anaheim Resort will be about 7 million
gallons (including The Disneyland Resort).

The existing water supply system consists of
numerous water lines that surround or traverse
the ARSP area. Modification of this system is
necessary to provide water at the pressures and
in the quantities needed to supply the ARSP
area. The following is a list of the improvements
that have been made to the water distribution
system to support implementation of the ARSP.
• Replacement of the 8-inch pipe in Clementine
Street from Katella Avenue to Disney Way
with a 20-inch pipe;
• Replacement of the existing 10-inch pipe in
Disney Way from Clementine Street to
Harbor Boulevard with a 20-inch pipe;
• Installation of a new well (Well 55) near the
intersection of Clementine Street and Disney
Way;
• Replacement of the existing 10-inch pipe in
Harbor Boulevard from Convention Way to
Disney Way with a 20-inch pipe;
• Replacement of the existing 10-inch pipe in
Harbor Boulevard from Disney Way to Harbor
Boulevard north of Manchester Avenue with a
16-inch pipe;
• Replacement of the existing 12-inch pipe in
Katella Avenue from Harbor Boulevard to
Clementine Street with a 20-inch pipe; and,
• Replacement of the existing 12-inch and 14-
inch pipes in West Street/Disneyland Drive
from Ball Road to Katella Avenue with a 20-
inch pipe.

The following additional improvements to the
water distribution system will be made as part of
the on-going implementation of the ARSP.
• Installation of a 16-inch pipe in Harbor
Boulevard from Orangewood Avenue to
Chapman Avenue; and,
• Provision for a new well to be constructed
near the intersection of Haster Street and
Orangewood Avenue.

Additional information about water use, supply
and improvements is provided in SEIR No. 340. If
any analyses or conditions above demonstrate
that improvements are necessary, those
improvements would be regulated by Anaheim’s
Water Rates, Rules and Regulations, Water
Services Administrative Procedures and Design
Guidelines (APDG), and Water Services
Standard Specifications (WSSS). The cost of all
Main Extensions, Main Enlargements,
abandonments, relocations, and easements
documents are the responsibility of the owner or
developer of the properties served by these
mains in accordance with Rule 15A.

Water conservation is an important part of the
Plan and will be achieved through numerous
measures intended to reduce water consumption.

Among the measures to be implemented within
the ARSP area to the extent applicable, include,
but are not limited to, the following:
• Low-flow sprinkler heads in irrigation
systems;
• Waterway recirculation systems;
• Low-flow fittings, fixtures, and equipment,
including low flush toilets and urinals;
• Efficient irrigation systems such as drip
irrigation, low flow irrigation heads, automatic
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-23
irrigation scheduling equipment, flow sensing
controls, rain sensors, soil moisture sensors
and other water conserving equipment;
• Low-flow shower heads in hotels;
• Water efficient ice-machines, dishwashers,
clothes washers and other water-using
appliances;
• Irrigation systems used primarily at night
when evaporation rates are lowest;
• Provision of information to the public in
conspicuous places regarding water
conservation;
• Water conserving landscape plant materials;
wherever feasible; and,
• Construction of separate irrigation lines and
implementation of recycled water when it
becomes available.

In addition to these measures, development in
the ARSP area will comply with Chapter 10.18
(Water Conservation and Water Shortage
Contingency Rules and Regulations) and chapter

10.19 (Landscape Water Efficiency Ordinance) of
Title 10 Anaheim Municipal Code, and Guidelines
for Implementation of the City of Anaheim
Landscape Water Efficiency Ordinance.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-24

4.8 Sanitary Sewer
The ARSP area is served by local sewer lines
owned and maintained by the City of Anaheim.

Wastewater in the local sewer lines generally
flows south and then west to the Orange County
Sanitation District (OCSAN) sewer trunks.

Wastewater from the ARSP area is conveyed
through City and OCSAN sewer trunks and
interceptors to the OCSAN Treatment Plant No. 1
in Fountain Valley.

The Central Anaheim Master Plan of Sanitary
Sewers (adopted by Anaheim City Council on
January 9, 2018, by Resolution No. 2018-001)
analyzed sewer system capacity in the ARSP
area. This plan identified the new regional sewer
lines to be constructed specifically for continued
buildout development within the ARSP area. As
specific projects with detailed information on
precise location, project statistics, and precise
sewer loading become available, sewer studies
may be required to determine if additional local
improvements are required.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
25 4.9 Storm Drain
Storm water from the northern portion of the
ARSP area will flow west in new or existing
underground storm drains to the Anaheim-Barber
Channel, located several hundred feet west of,
and parallel to Walnut Street as identified in the
Master Plan of Storm Drainage for Anaheim
Barber City Channel Tributary Area June 2009
(adopted by Anaheim City Council on October
27, 2009 by Resolution No. 2009-163). Storm
water from the southern portion of the ARSP
area will flow south to the East Garden GroveWintersburg Channel as identified in the Master Plan of Storm Drainage for East Garden Grove
Wintersburg Channel Tributary Area January
2006 (adopted by Anaheim City Council on
March 7, 2006 by Resolution No. 2006-029).

Eventually, the storm water from the entire ARSP
area empties into the ocean at Huntington
Harbor.

The following is a list of the planned facilities to
be constructed to handle the storm water flows
from the ARSP area:
• A relief drain in Harbor Boulevard, Vermont
Avenue and East Street;
• An upgrade drain in Ball Road;
• A parallel or relief drain in Cerritos Avenue,
Walnut Street and Magic Way;
• An upgrade or parallel storm drain in Katella
Avenue and an upgrade drain and new storm
drain line north of it in Anaheim Boulevard;
• An upgrade drain in Manchester Avenue;
• New storm drain lines in Guinida Lane, Palm
Street and Winston Road;
• A parallel or upgrade drain in Orangewood
Avenue, Harbor Boulevard and Wilken Way;
• A relief drain in Haster Street and Gene Autry
Way.
• A parallel or upgrade drain in Hotel Way
All new development and/or redevelopment
projects shall participate in the City's Master Plan
of Drainage and related Infrastructure
Improvement (Fee) Programs to assist in
mitigating storm drainage system deficiencies as
described in SEIR No. 340.

With approval of DisneylandForward, the
following additional storm drain improvements
will be required:
• With development of the Southeast
District of The Disneyland Resort Specific
Plan and the Theme Park East Overlay,
connections to the existing storm drains in
surrounding streets would be required;
and,
• Disney will continue to comply with the
Master Water Quality Management Plan,
which applies to all Disney Properties in
The Anaheim Resort.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-26

4.10 Electricity
Electricity for the ARSP area is provided by the
City of Anaheim Public Utilities Department.

Electric utilities are installed underground in
accordance with City Electrical Construction
Standards, the Electric Rates, Rules and
Regulations, and the Development Standards
and Guidelines for The Anaheim Resort. Full
implementation of the ARSP will increase the
demand for electricity by approximately 291.7
million kilowatt hours annually and an estimated
799,344 kilowatt hours on an average day. The
estimated net increase in electrical demand
associated with implementation of the ARSP
area is 110.5 million volt amperes. The load
could be higher if theme park uses are moved
from the DRSP Theme Park District to the ARSP
Theme Park East and West Overlays.

As part of an existing City of Anaheim Capital
Improvement Program, the existing overhead
electric utilities on Katella Avenue, West Street/
Disneyland Drive, and Harbor Boulevard were
placed underground. The undergrounding was
completed prior to or at the same time that the
area street improvements were completed. New
lines constructed to serve the area will also be
placed underground.

A new substation facility was constructed at the
northeast corner of Katella Avenue and Zeyn
Street in November 2019.

In order to conserve energy, the owner or
developer shall implement energy saving
practices which may include the following:
• High-efficiency air-conditioning with EMS
(computer) control;
• Variable air volume (VAV) distribution
• Outside air (100%) economizer cycle;
• Staged compressors or variable speed drives
to flow varying thermal loads;
• Isolated HVAC zone control by
floors/separable activity areas;
• Specification of premium-efficiency electric
motors (i.e., compressor motors, air-handling
units, and fan-coil units);
• Use of occupancy sensors in appropriate
spaces;
• Use of compact fluorescent lamps;
• Use of cold cathode fluorescent lamps;
• Use of light emitting diode (LED) or
equivalent energy-efficient lighting for outdoor
lighting;
• Use of Energy Star® exit lighting or exit
signage;
• Use of T-8 lamps and electronic ballasts
where applications of standard fluorescent
fixtures are identified;
• Use of lighting power controllers in
association with metal-halide or highpressure sodium (high intensity discharge) lamps for outdoor lighting and parking lots;
• Consideration of thermal energy storage airconditioning for spaces or facilities that may require air-conditioning during summer, daypeak periods; • For swimming pools and spas, incorporate
solar heating, automatic covers, and efficient
pumps and motors, as feasible; and,
• Participation in energy efficiency incentive
programs.

The Public Utilities Department will coordinate
with property owners and developers to
incorporate feasible renewable energy
generation measures, including but not be limited
to the use of solar and small wind turbine
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-27
sources on new and existing facilities and the
use of solar powered lighting in parking areas. In
addition, new building construction will be
required to exceed Title 24 Energy Efficiency
Standards for Residential and Nonresidential
Buildings at the time of building permit
application by at least 10 percent.

4.11 Natural Gas
Natural gas for the ARSP area will be delivered
by Southern California Gas Company, which
maintains both standard and high pressure gas
lines in the vicinity of the ARSP area. Wherever
practical, development within the ARSP area will
be required to incorporate energy-saving means
into the project to reduce consumption of natural
gas. In addition, many of the energy conservation
measures described in Section 4.10 above will
also result in natural gas savings.

4.12 Telephone Services
AT&T provides telephone, digital cable, and highspeed internet services to the ARSP area.

Existing facilities are located in the developed
areas surrounding the ARSP area. The
infrastructure capacity for telephone service
typically expands with new development.

4.13 Television/Cable Service
Time Warner Cable currently provides both fiber
and coaxial feeds in the ARSP area for a variety
of services including, but not limited to, standard
and high definition cable television service, PRI
T1 telephony circuit(s), cable television service,
high speed internet, and digital telephone
service.

4.14 Solid Waste
Solid waste from the ARSP area will be collected
by a City contracted disposal company. Collected
waste is processed through Republic Waste
Services of Southern California LLC’s Regional
Material Resource Recovery Facility (MRF). The
facility contains an 800-foot-long automated and
manual sorter/conveyor system that separates
more than 70 types of recyclables. Remaining
non-recyclable waste is processed and
consolidated before delivery to the Brea-Olinda
Alpha landfill in unincorporated Orange County
adjacent to the City of Brea. In addition to the
processing of collected waste at the MRF for
recyclable materials, one or more solid waste
reduction programs may be required of new
development, including but not limited to:
• Facilitating recycling by providing chutes or
convenient locations for sorting and recycling
bins;
• Facilitating cardboard recycling (especially in
retail areas) by providing adequate space
and centralized locations for collection and
storing;
• Facilitating glass recycling (especially from
restaurants) by providing adequate space for
sorting and storing;
• Providing trash compactors for nonrecyclable materials whenever feasible to reduce the total volume of solid waste and
the number of trips required for collection;
• Prohibiting curbside pick-up; and,
• Providing the following on-going practices
during project operations as feasible:
o Use of recycled paper products for
stationery, letterhead, and packaging;
o Recovery of materials such as aluminum
and cardboard;
o Collection of office paper for recycling;
The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-28
o Collection of polystyrene (foam) cups for
recycling; and
o Collection of glass, plastics, kitchen
grease, laser printer toner cartridges, oil,
batteries, and scrap metal for recycling or
recovery.

Property owners that develop in accordance with
the ARSP will be required to implement a Waste
Management Plan that includes, but is not limited
to:
• Detailing the location and design of on-site
recycling facilities;
• Providing on-site recycling receptacles to
encourage recycling;
• Complying with all Federal, State, County,
and City regulations for hazardous material
disposal; and,
• Participating in the City's “Recycle Anaheim”
program or any additional substitute
programs as developed by the City.

4.15 Public Services
The City Fire Department, in conjunction with the
Utilities Department has set the minimum
standards for water flow for the ARSP area. In
addition, they will review all future development
for compliance with City Fire Department
standards. Typical requirements include the
installation of sprinklers in accordance with the
Anaheim Municipal Code, preparation of
emergency fire access and construction fire
protection plans, provision of adequate access to
structures for fire fighting vehicles and location of
fire hydrants in conveniently accessible locations.

Since continued development in the ARSP area
will increase the number of service calls to the
Fire Department, new development shall be
required to participate in fair share funding of the
following measures intended to improve fire
protection:
• One additional fire truck company;
• One additional paramedic company;
• Modifications to existing fire stations to
accommodate the additional fire units,
additional manpower, equipment and
facilities;
• A vehicle equipped with specialty tools and
equipment to enable the Fire Department to
provide heavy search and rescue response
capability; and,
• A medical triage vehicle/trailer, equipped with
sufficient trauma dressings, medical supplies,
stretchers, etc., to handle 1,000 injured
persons, and an appropriate storage facility.

The Anaheim Fire Department will provide the
following list of services:
• Development Project Meetings;
• Preconstruction Plan Review;
• Preplanning for firefighting and
evacuations;
• All new construction inspections;
• All state mandated CUPA inspections;
• All state mandated and non-state
mandated annual fire inspections;
• Review and inspections of all special
event permits;
• Monitoring of pyrotechnics and special
effects; and,
• Interconnected Safety System (ISS)
Testing.

The Anaheim Resort Specific Plan 4.0 Public Facilities Plan DRAFT FOR PUBLIC REVIEW (SEPT 2023)
4-29
The Anaheim Police Department provides law
enforcement services to the ARSP area. The
Police Department is divided into four service
districts (Central [Main], South, East, and West)
each containing a police station. The ARSP is
located within the Central District and is served
by the Central Station.

Law enforcement services to be provided by the
Police Department include traffic control and
enforcement, narcotics violations, crime control,
community and tourist regulation, detention
facilities, various investigations, and patrol. The
additional police service personnel needed for
the development of The Anaheim Resort will be
funded through annual tax proceeds and
incremental growth in and around The Anaheim
Resort
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-1

5.0 DESIGN PLAN
The Design Plan contains descriptions of the
basic concepts that will help achieve the ARSP's
fundamental goal of creating a unified resort
identity for the ARSP area. Written text in this
Section describes the fundamental design
concepts, while the drawings that accompany the
text show how the concepts will be implemented.

The Design Plan has been coordinated with
several adopted documents that describe design
concepts for the ARSP area. These documents
include The Disneyland Resort Specific Plan,
The Anaheim Resort Public Realm Landscape
Program, and The Anaheim Resort Identity
Program. In addition, this Section is intended to
supplement the Zoning and Development
Standards contained in Section 7.0, which is
codified as Chapter 18.118 of the Anaheim
Municipal Code.

Since the public streets are the interface between
the ARSP and The Disneyland Resort Specific
Plan, both specific plans describe in detail the
design of the public streets, as well as the
treatment of setback areas adjacent to public
streets. The emphasis in both plans is on
creating unity through landscape design, a
standardized design vocabulary for streetscape
elements (such as light poles and directional
signs), and regulation of private property,
including standards for signs, building heights,
and setbacks.

For ease of reference and to better depict the
relationship between the two specific plans, the
ARSP contains information about the treatment
of all public streets that border or are within the
ARSP area boundaries. As a result, there is an
overlap in the information contained in both
specific plans along the border between the two
areas. For example, the description and
illustrations of the design concept for Harbor
Boulevard appear in both specific plans.

On September 20, 1994, the City Council
adopted Resolution No. 94R-239 approving The
Anaheim Resort Public Realm Landscape
Program. Subsequent amendments have been
adopted as described in the Program document
on file in the City of Anaheim Planning and
Building Department. The Anaheim Resort Public
Realm Landscape Program summarizes
landscape concepts proposed for the public
streets within The Anaheim Resort and provides
a general overview of the different landscape
treatments that will help create a unifying resort
identity.

The ARSP is also consistent with The Anaheim
Resort Identity Program approved by the City
Council by adoption of Resolution No. 94R-238.

Subsequent amendments have been adopted as
described in the Program document on file in the
City of Anaheim Planning and Building
Department. The Anaheim Resort Identity
Program contains specific recommendations for
the location and design of gateways, directional
signs, banners, light fixtures, street furniture, and
potential pedestrian bridges or crossings for The
Anaheim Resort. Section 5.5, Identity Concept
Plan, of the ARSP summarizes how signs and
other identity elements will help create the unified
environment envisioned for the entire Anaheim
Resort area.

The information in this Section supplements the
Zoning and Development Standards contained in
Section 7.0 in the following ways. First, it
describes the fundamental design ideas and
concepts that are the basis for the standards and
regulations. This description of the basic
concepts will assist in the interpretation of the
intent of the ARSP in situations where several
options may be consistent with the regulations.

Also, it contains design guidelines that would be
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-2
considered too general to be standards or
regulations but convey useful information about
the character and quality of development
anticipated within the ARSP area. Finally, this
Section contains sketches, cross-sections and
photos that show what the physical appearance
of important conditions in the ARSP area should
be if the standards, regulations, and guidelines
are implemented in accordance with this section
and Section 7.0. By showing how the two work
together, the intent of the ARSP can be
conveyed in a more comprehensive manner.

In addition to this introduction, this Section is
divided into eight parts, including:
• 5.1 Design Plan Objectives;
• 5.2 Design Concepts;
• 5.3 Landscape Concept Plan;
• 5.4 Landscape Cross Sections;
• 5.5 Identity Concept Plan;
• 5.6 Design Criteria for the Public Realm;
• 5.7 Design Criteria for the Setback Realm;
and,
• 5.8 Design Criteria for the Private Realm.

5.1 Design Plan Objectives
The Design Plan is intended to achieve three
principal design objectives. They are:
• Create visual continuity between the ARSP
area and the adjacent Disneyland Resort
Specific Plan area;
• Create a high quality, visually appealing,
pedestrian-oriented environment;
• Create landscape and design standards and
regulations to reinforce the area's identity;
and,
• Enhance Public Views of the Theme Parks,
including Back-of-House Uses, From Public
Walkways and Streets.

The following are descriptions of each of these
objectives.

5.1.1 Create Visual Continuity between
the ARSP Area and the Adjacent
Disneyland Resort Specific Plan Area
An important objective of the ARSP is to visually
tie the ARSP area to the adjacent Disneyland
Resort Specific Plan area through the consistent
use of landscape and other streetscape elements
including signs, gateways, lights and other
elements. The Anaheim Resort will then have a
more unified identity, and there will be a smooth
transition from the ARSP area and The Disneyland Resort Specific Plan Area.

5.1.2 Create a High Quality, Visually
Appealing, Pedestrian-Oriented
Environment
A second design objective is to create a high
quality pedestrian environment that reinforces the
urban character of the ARSP area. With the
development of Disney’s California Adventure
theme park and new theme park attractions
within the ARSP area, construction of the new
public parking facilities in The Disneyland Resort,
and the increase in the number of visitor
accommodations both within The Disneyland
Resort Specific Plan and the ARSP, there will be
a measurable increase in the number of
pedestrians in the area. Anticipated improvement
and expansion of the Anaheim Convention
Center will also contribute significantly to the
increase in pedestrians. This will help support an
active street environment for shopping, dining
and lodging within walking distance from the
theme parks and the Anaheim Convention
Center. The Design Plan addresses the needs of
pedestrians by:

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-3
• Establishing the size and location of
pedestrian walks;
• Defining the type of landscape necessary to
create a pedestrian scale; and,
• Providing for other amenities, such as
directional signs, intended to enhance the
overall pedestrian experience.

5.1.3 Create Landscape and Design
Guidelines to Reinforce the Area's
Identity
The Design Plan also provides landscape
guidelines for the setback areas and along the
public streets that pass through the center of the
ARSP area in order to reinforce the overall
consistency of the area's identity. The setback
landscape will also help provide a continuity element in front of existing buildings that have a variety of architectural styles. In addition, the
Design Plan includes design guidelines intended
to support the overall quality of development in
the ARSP area by establishing sound minimum
criteria for private development.

5.1.4 Enhance Public Views of the Theme
Parks, including Back-of-House Uses,
From Public Walkways and Streets.

A fourth design objective is to enhance public
views of theme park uses, from public walkways
and streets through a variety of design
interventions. Leading up to the theme parks,
visitors outside the park utilize public walkways
and streets to access theme park uses. As
visitors make their way to and from theme park
uses, landscaping and walls/fencing are utilized
at the pedestrian level to screen on-site buildings
and structures, enhance the visual experience,
and add to the sense of anticipation and arrival.

Buildings and structures are treated with varying
design elements based on height and visibility
from public walkways and streets in order to
enhance the experience of visitors outside of and
leading up to the theme park uses.

5.2 Design Concepts
The concepts described below are the basic
design policies for the ARSP area and form the
basis for implementation of the Design Plan.

They address the objectives of the Design Plan
described in Section 5.1, Design Plan Objectives,
and include a description of the important site
factors that will affect implementation of the
design concepts.

5.2.1 Transform and Unify with
Landscape
The primary concept of the Design Plan is to
transform the visual character of The Anaheim
Resort with landscape. The primary component
of this transformation will be the streetscape,
which includes trees and shrubs, as well as manmade elements such as light fixtures, benches, entry gateways, and signs. Setback areas on
private land between the public street and
buildings are also important in this
transformation. In some instances, the visible
portions of buildings and private land behind the
setbacks will also play a role in defining the
character of the ARSP area.

5.2.2 Create a District with a Grand Scale
The Anaheim Resort encompasses
approximately 1,078 acres, a large urban area in
which to create a unified identity. In addition,
many of the streets within The Anaheim Resort
are wide and provide important regional
circulation linkages. Finally, the number of
visitors to the area is flexibility significant and will grow with development of the Anaheim Resort
and The Disneyland Resort Specific Plans.

Consequently, the character of The Anaheim
Resort as a whole must be grand in scale to
complement the size and importance of the area
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-4
as a world-class destination resort. The Design
Plan proposes creating a grand scale primarily
with large-scale landscape plantings and
architectural regulations, including building
heights and setbacks.

5.2.3 Emphasize Landscaping on Public
Streets
Most visitors to the ARSP area and the adjacent
Disneyland Resort Specific Plan area will
experience the area's streets at some time during
their visit, either from automobiles, other vehicles
(such as the pedestrian and/or transportation
system(s) or monorail discussed in The
Disneyland Resort Specific Plan), or on foot.

Nearly all of the publicly-owned land within both
areas is contained within the street rights-of-way
(or in easements), though the space available for
landscaping within the public right-of-way will be
somewhat limited because of the need to serve
vehicle and pedestrian circulation.

Streets and their edges furnish the primary space
in which landscaping can be placed to transform
the identity of The Anaheim Resort. Where new
rights-of-way are being created, sufficient space
will be provided within the right-of-way to
accommodate the proposed landscape.

Exhibit 5.2-1 Utilize the Streets for
Landscaping

5.2.4 Orient Visitors Visually
Visitors to the ARSP area and the adjacent
Disneyland Resort Specific Plan area often come
from great distances and lack familiarity with
Anaheim and The Anaheim Resort. These
visitors need well-defined visual cues that orient
them to their location within the area. In addition,
there is great variety in the different uses and
functions of the spaces within the ARSP area,
and the scale of the spaces often varies as well.

The Design Plan differentiates the major streets
within the ARSP area by establishing landscape
treatments that will help create a unique
character for each.

5.2.5 Create a Recognizable Center for
the Anaheim Resort
In coordination with The Disneyland Resort
Specific Plan, the Design Plan establishes an
area known as the Central Core, which will have
special design standards. It includes parcels
located on Harbor Boulevard between Interstate
5 and Orangewood Avenue, and on Katella
Avenue between Interstate 5 and Walnut Street.

For parcels adjacent to Harbor Boulevard and to
Katella Avenue, special design standards will
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-5
apply to setbacks and streetscape treatments
that are different from other locations in The
Anaheim Resort.

5.2.6 Coordinate Streetscape
Improvements with Other Improvements
The construction of the streetscape
improvements in the ARSP area will be
coordinated to the extent feasible with public and
private improvements, such as the
undergrounding of utilities. The intent is to install
public streetscape improvements as soon as
possible, while minimizing the need to disrupt
these improvements once they have been
installed.

5.2.7 Establish a Clear Design Hierarchy
The ARSP specifies three distinct levels of
design hierarchy called the Public Realm, the
Setback Realm, and the Private Realm. The
intent is that the most visually prominent areas
have the most rigorous design controls, and that
the design of less visually prominent areas be
more flexible.

Exhibit 5.2-2 The Three Elements of the
Design Hierarchy: The Public Realm, The
Setback Realm, and the Private Realm
Setback
Realm
Private
Realm
Public
Realm
Ultimate Public
Right-of-Way
Building
Setback
Buildable
Portion
Buiding
Envelope
Areas within the ultimate public right-of-way are
called the Public Realm. This visually prominent
area is the most precisely defined and designed
of the three Realms. The Public Realm concepts
for the entire Anaheim Resort area are regulated
by The Anaheim Resort Public Realm Landscape
Plan. The Setback and Private Realm concepts
are regulated for the respective specific plan
areas by the Anaheim Resort and Disneyland
Resort Specific Plans. The Setback Realm
includes the private property between the
ultimate right-of way and the required minimum
building setback. Since these areas are not quite
as significant to the overall character of the
ARSP area as the Public Realm, the plan
provides for more flexibility in their design. The
Private Realm, which includes areas behind
building setbacks adjacent to public streets, is
guided by design criteria that are the most
flexible of the three realms, but still contain
important design guidelines intended to enhance
the overall identity of the ARSP area.

Development of the Private Realm will occur with
less predictability than the other Realms, and so
less specificity is provided in the design
guidelines. Additional discussion of the three
Realms can be found in Subsections 5.6, 5.7,
and 5.8.

5.3 Landscape Concept Plan
This section of the Design Plan describes the
landscape design principles for the ARSP area
that will contribute to the unified environment
envisioned by the Plan. It contains a description
of the basic landscape concepts, criteria for the
selection of plant material, and general planting
design guidelines for the public streets and
adjacent setbacks, which the Plan calls the
Public Realm and the Setback Realm. The
Landscape Concept Diagram (Exhibit 3.9-1 of
The Anaheim Resort Public Realm Landscape
Program) shows how the principles have been
applied to the important streets in The Anaheim
Resort. Section 5.4, Landscape Cross Sections,
illustrates the basic landscape design principles.

The adopted Anaheim Resort Public Realm and
Landscape Program and Anaheim Resort Identity
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-6
Program regulate the Public Realm within The
Anaheim Resort.

The landscape design drawings, photos and
landscape cross sections found in this Section
and Section 5.4, Landscape Cross Sections,
illustrate basic landscape design concepts, and,
unless needed to illustrate a concept described in
the text, do not contain dimensions or other
detailed information about street right-of-way
widths or minimum setback dimensions. Information about street rights-of way and minimum setbacks can be found in Section 4.3, Vehicular
Circulation Plan, and Section 7.0, Zoning and
Development Standards, respectively.

5.3.1 Plant Material Selection and Use
The purpose of this subsection is to:
• Describe the basic plant selection criteria for
the plants that will be used in the ARSP area;
• Describe the role each type of plant (tree,
shrub, ground cover) will play in establishing
the overall character of the ARSP area; and,
• Identify in a general way where and how each
type will be used.

The information in this subsection is
supplemented by a detailed plant palette in
Planning Standard Detail No. 10, which contains
a list of plants recommended for use in the ARSP
area. The purpose here is to provide the rationale
that serves as the basis for the plant palette.

5.3.1.1 Basic Selection Criteria
The desirable attributes of plants to be used in
the ARSP area include:
• Climate appropriate;
• Drought tolerant and/or low water using;
• Reasonably low in maintenance;
• Relatively free from disease and pest
infestation,
• Outstanding in some characteristic, such as
form, color, bark, etc.;
• Unlikely to be familiar outside subtropical
areas;
• Evergreen;
• Native to Southern California;
• Moderate or fast in growth; and,
• Suitable for use around people.

The intent is to establish an overall appearance
that has connection to Southern Californian
character while also integrating plants that are
climate-appropriate and/or low water using.

There is virtually no list of plants that could be
developed that would completely satisfy all of
these conditions. The intent is to provide a list
from which plants can be selected that will
provide the best plants to respond to the needs
of different uses/functions in the ARSP area, as
well as the flexibility to be used in a variety of
different situations.

5.3.1.2 Tree Selection and Use Criteria
Trees will be the backbone plant material of the
planting design because of the size and
widespread presence in the street rights-of-way
and setback areas. The following describes the
different types of tree forms that will be used
throughout the ARSP area, and the criteria that
will be used to determine how they will be used.

Small canopy trees: Small canopy trees are
intended for use where it is desirable to create a
more intimate scale (such as along narrow
streets or in pedestrian areas), where a contrast
with a larger tree will help reinforce the layered
landscape concept, or to contrast with a tree with
a distinctly different form. On wide streets where
the separation between trees from one side of
the street to another (or from a parkway to a
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-7
median planting) is thirty feet or greater, small
canopy trees should always be combined with
medium or large canopy trees.

Small canopy trees will have a mature height of
at least twenty feet, but not more than forty feet.

Their mature spread will be approximately equal
to their height. Along streets with regularly
spaced trees, small canopy trees will be planted
at a rate of one tree for each twenty to thirty
lineal feet of frontage; spreading trees may
require a somewhat wider spacing.

Medium canopy trees: Medium canopy trees
may serve the same purposes as either the large
or small canopy trees. Typically, they will have a
mature height of at least thirty feet but will not
typically exceed sixty feet. Their mature spread
will approximately equal their height. Along
streets with regularly spaced trees, medium
canopy trees will be planted at a rate of one tree
for each twenty-five to thirty-five lineal feet of
frontage; spreading trees may require a
somewhat wider spacing. Medium canopy trees
may be used on local or secondary streets but
should not be used alone on arterial roads or
other streets greater than sixty feet wide unless
there is a landscaped median.

Exhibit 5.3-1 Medium Canopy Trees
Large canopy trees: Large canopy trees will be
used on arterial roads to help reinforce the grand,
civic scale of The Anaheim Resort landscape.

They are intended to be large scale elements
that create a strong, positive visual impression.

Their mature height will not be less than fifty feet
and may exceed eighty feet. For the smaller
trees in this category, the spread will
approximately equal the mature height, while in
larger trees the spread will typically be 50% to
75% of the height. Along streets with regularly
spaced trees, large canopy trees will be planted
at a rate of one tree for each thirty to forty lineal
feet of frontage; spreading trees may require a
somewhat wider spacing. Large canopy trees
may also be used in setback areas that exceed
twenty feet in width and may be planted in
masses.

Exhibit 5.3-2 Large Canopy Trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-8
Vertical and Pyramidal trees: Vertical trees
have a mature height that dramatically exceeds
their mature width. Vertical trees will have a ratio
of height to width not less than 4:1, but which
may (in the case of certain varieties of palm)
exceed 20:1. Vertical trees will range in height
from 30 to 100 feet when mature. The spacing of
vertical trees will typically be from eight feet to
thirty feet on center for streets on which they are
regularly spaced, depending on the ultimate size
and spread of the specific tree. When the primary
purpose is screening, vertical trees will be
evergreen and will be spaced so that the mature
trees form a dense visual barrier. When used in
the Public Realm, vertical trees will generally be
used in combination with canopy trees, especially
areas with pedestrians, who will need canopy
trees to provide shade. Vertical trees are
especially useful in narrow setback areas as a
contrast with lower growing canopy trees or
shrubs to create the layered landscape.

Vertical and pyramidal trees are intended to
serve a variety of purposes. Among these are:
• Screening views of adjacent uses or property;
• Establishing regular, easily recognizable
geometric patterns; and,
• Providing a dramatic vertical expression that
stands out from the surrounding landscape.

Pyramidal trees have a characteristic shape like
a pyramid, and benefit from having space that
permits their lower branches to touch the ground.

Many needle-leafed evergreens, such as pine
and cedar trees, belong to this category.

Pyramidal trees will be used as screens, as
large-scale backdrop, in formal rows within
setbacks, or, where space permits, as large
specimens.

Exhibit 5.3-3 Vertical and Pyramidal Trees

5.3.1.3 Shrub, Vine and Ground Cover
Selection and Use Criteria
This subsection explains the role that will be
played by shrubs, vines and ground cover to
support the basic design established by the
trees.

Shrubs: Shrubs will serve several main design
purposes to reinforce the basic landscape plan,
including the following:
• Screen views of surface parking lots, service
areas, trash enclosures, and other sights that
detract from the garden-like character
envisioned for the area, or to provide privacy
for pool areas, outdoor eating areas, and
patios associated with ground floor hotel
rooms;
• Providing a physical barrier to discourage
pedestrians from crossing streets mid-block,
or to direct pedestrian and vehicular traffic;
and,
• Introducing an intermediate to low layer within
a layered landscape.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-9
Exhibit 5.3-4 Use of Shrubs to Screen
Surface Parking Lots
A large range of shrub species with varying
heights will be utilized to create an identity and
diversity within the planting palette in order to not
be dominated by a single species. Shrubs will
often appear as either loose (unclipped) or formal
(clipped) hedges of consistent height. Shrubs
that are very low growing (less than two feet tall),
and that spread widely will be used as a ground
cover, while shrubs that grow taller (up to fifteen
feet) will be used for screening.

Exhibit 5.3-5 Formal (Clipped) Hedges
Vary in Height
Vines: Vines will be used for the following main
purposes:
• Creating a cloak to cover walls and buildings.

For example, clinging vines will be used on
parking facilities, buildings and walls to
enhance building elevations, and will help
discourage graffiti;
• Creating vertical and hanging gardens. Vines
will be trained to the trunks of palms in order
to enhance their appearance at the
pedestrian level and will be used in planters
on parking facilities or other buildings. Vines
will also be used on garden structures such
as arbors and trellises, especially where
limited planting area precludes a more
traditional planting of trees and shrubs; and,
• Establishing a sprawling ground cover in
large areas where the vine's growth can be
contained in the available space.

Ground Cover: In addition to spreading, low
growing shrubs and sprawling vines, ground
covers include turf and other grasses, low
growing annuals, and other varieties of plants
that do not generally exceed two or three feet in
height at maturity. Large areas of landscape will
be planted with low water-using ground covers in
order to reduce water usage and long-term
maintenance costs. The use of turf as a ground
cover will be limited to particular areas where its
smooth, green, manicured appearance and
ability to accommodate light pedestrian traffic is
needed. Generally, ground covers will be used to
create a green or colored blanket over the
ground.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-10
Exhibit 5.3-6 Ground Cover Includes Turf
and Other Grasses, Annuals, and Other
Varieties of Plants

5.3.2 Layered Landscape Design Criteria
This subsection describes in more detail the
layered landscape concept and provides criteria
that will be used to design areas in the Setback
Realm designated to have a layered landscape
treatment.

Since planting in both the Public Realm and
adjacent Setback Realm will be needed to create
a layered landscape, successful implementation
requires that planting in both reinforce each
other. As a result, setback landscaping will vary
depending on the treatment of adjacent Public
Realm landscape.

Implementation of the layered landscape is most
important in two areas: along Katella Avenue and
Harbor Boulevard, the two major streets within
the Central Core; as an additional device to
create a unified appearance; and, adjacent to
large parking facilities, which will benefit from the
articulation of the building facade provided by the
variation in the size and height of plant material.

Such effective articulation for these buildings
would be difficult to provide only with
architecture. While construction of the layered
landscape in the Public Realm will be achieved in
large continuous sections of street, layered
landscape in the Setback Realm will be
constructed in smaller pieces as individual
parcels develop or are renovated. Achievement
of the layered landscape look will depend on the
successful enforcement of the concept on
numerous parcels over a number of years.

The length of the street frontage of individual
parcels is the most important factor that will
influence implementation of the layered
landscape. Parcel frontages of more than five
hundred lineal feet are long enough to provide
the variation needed to create the layered
landscape look within a single parcel, while
frontages of less than three hundred feet are too
short to provide much variation. Therefore, areas
that have many parcels with short frontages will
require special consideration. Exhibits 5.3-7
(Layered Landscape Design Criteria for
Properties with Frontages Greater than 300 Feet)
and 5.3-8 (Layered Landscape Design Criteria
for Properties with Frontages Less than 300
Feet) illustrate diagrammatically the criteria for
creating layered landscape based on the length
of parcel frontage.

The width of the landscape setback will also
affect the creation of the layered landscape. In
order to create a layered landscape, there needs
to be at least two horizontal or two vertical layers
of landscape. This means that in narrow setbacks (10-20 feet wide), the selection of plant material is likely to be different than for medium
(20-30 feet), or wide (greater than 30 feet)
setbacks. Wider setbacks permit the use of a
larger canopy or pyramidal trees, or will allow
more than three layers in the Setback Realm
alone. Exhibit 5.3-9 (Layered Landscape Setback
Width Criteria) illustrates diagrammatically the
criteria for creating layered landscape based on
setback width.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-11
Exhibit 5.3-7 Layered Landscape Design Criteria for Properties with Frontages Greater than 300 Feet
Consistent street tree planting forms
layers(s) in Public Realm (typical)
Minimum length: 150 ft
Vertical or canopy tree greater
than 50 ft tall at maturity
No minimum
length for ground
covers
Minimum length: 100 ft Min length:
50 ft
Tall shrub or small
canopy tree, 10-25 ft tall
at maturity
Medium shrub, 5-15 ft
tall at maturity
Exhibit 5.3-8 Layered Landscape Design Criteria for Properties with Frontages Less than 300 Feet
Consistent with street tree Within Setback Realm, each property planting forms layer(s) in must match the layered landscape of Public Realm (typical) one of its adjacent neighbors
Property
B
Property A Property C
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-12
Exhibit 5.3-9 Layered Landscape Setback Width Criteria
Each layer shall be landscaped. The number and size of trees shall be balanced between all layers. See Exhibit 5.6.6.6.3a, Tree Density Plan for size and number of trees in the setback areas.

Larger scale plants should
be used on wider setbacks
Alternate use of
medium scale plant
permitted (typical)
Typical plant
material "envelope"
10-15 ft 15-25 ft 25-45 ft
Minimum of 3 horizontal and
3 vertical layers in wide
setback areas
Minimum of 2
horizontal and 3 vertical
layers in narrow width
setback areas
Minimum of 3 horizontal
and 3 vertical layers in
medium width setback
areas
Each layer shall be landscaped. The number and size of trees shall be balanced between all layers. See Exhibit 5.3-10 (Tree Density Factor Plan) for size and number of trees in the setback areas.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-13

5.3.3 Minimum Tree Density
The Design Plan identifies trees as a critical
element necessary to create a civic scale, and
trees are also needed to establish the layered
landscape envisioned for the Setback Realm.

Trees in the setbacks adjacent to public streets
also support the landscaping proposed for the
Public Realm. Therefore, both the size and
number of trees, which are to be planted in the
Setback Realm are regulated by the minimum
landscape requirement.

To permit flexibility and design creativity in
landscape design, the minimum landscape
requirement recognizes that the effect of planting
many smaller sized trees is comparable to the
effect created by planting fewer large trees.

Therefore, the regulation allows for variation in
the size and number of trees. However, the
Setback Realm landscaping adjacent to public
streets must also be in conformance with the
requirements identified in Subsection 5.3.2,
Layered Landscape Design Criteria, which
requires a balanced number of
trees/plants/shrubs to be planted within the
various landscaping layers.

Refer to Planning Standard Detail No. 10 for
relevant tree spacing recommendations.

5.3.3.1 Tree Density to Vary According to
Adjacent Use
The Design Plan also recognizes that the density
of trees adjacent to some types of uses should
be different than the density adjacent to others.

The densest tree planting will be required
adjacent to residential uses. Dense planting will
also be required when intended to screen an
area as in the case adjacent to parking structures
or service areas. The least dense planting will be
required adjacent to the public right-of-way for
hotels, restaurants, or other visitor-serving uses
where visibility to the public is important.

5.3.3.2 The Tree Density Factor
To differentiate one tree density from another, all
final landscape plans submitted to the City for
approval will be required to show the Tree
Density Factor for each landscape area. To
establish the Tree Density Factor, all trees
planted in the setback areas will have a point
value based upon their size at installation. The
point value varies depending on the size of the
tree: large trees have a higher point value than
small trees (the actual values are defined below).

The Tree Density Factor for any landscape area
is defined as the sum of the point values for all
trees installed divided by the total area required
to be landscaped.

The ARSP establishes three levels of tree
density, as indicated in Table 5.3-1 Levels of
Tree Density.

Table 5.3-1 Levels of Tree Density
Tree Density
Level
Tree
Density
Factor
Very Dense ≥.8
Screening adjacent to
sensitive areas, for
example next to residential
zones and the MHP
Overlay Zone
Dense ≥.5 to <.8
Screening adjacent to
parking structures, interior
property lines or the I-5
freeways/ramps
Moderately
Dense ≥.3 to <.5
Landscaping adjacent to
the public right-of-way for
hotels, restaurants and
other visitor-serving uses
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-14
Exhibit 5.3-10 (Tree Density Factor Plan), shows
the location of each density of tree planting
required by the plan adjacent to all public streets
and to properties bordering the ARSP area. All
trees are also subject to a minimum size at the
time of installation. Refer to the Planning
Standard Detail No. 10 for more information. The
tree point values are defined in Table 5.3-2 (Tree
Point Values).

Table 5.3-2 Tree Point Values
5 points
5-gallon tree (minimum tree size permitted
in the Setback Realm)
15 points 15-gallon tree
50 points 24-inch box canopy or vertical tree;
Washingtonia or Brahea species palm
with a trunk
125 points 36-inch box canopy or vertical tree;
Washingtonia or Brahea species palm
with a trunk ≤ 20 feet in height; Phoenix
species palm with trunk < 5 feet in height
300 points 48-inch box canopy or vertical tree;
Washingtonia or Brahea species palm
with a trunk > 20 feet in height; Phoenix
species palm with trunk ≤ 20 feet in height
600 points 60-inch box canopy or vertical tree;
Phoenix species palm with trunk > 20 feet
in height
1,200 points 72-inch box canopy or vertical tree
The total number of points for a given landscape
area within the setback must be equal to or
greater than the product of the Tree Density
Factor and the area to be landscaped. For
example, a 10,000 square foot landscape area
with a factor of .5 requires the total point value of
trees planted in this area to equal or exceed
5,000 points.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-15
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-16

5.3.4 Plant Selection
This subsection is intended to assist in the
selection of plant material to be used within all
three Realms of the ARSP area. Planning
Standard Detail No. 10 contains two plant
selection matrices: one for trees and another for
shrubs, vines and ground cover. The plants listed
in Planning Standard Detail No. 10 fulfill the
planting design requirements contained in
Subsection 5.3.1, Plant Materials Selection and
Use, and identify the specific plant material that
may be used to satisfy the landscape
requirements in the Design Plan.

Planning Standard Detail No. 10 identifies the
trees by street location and Exhibit 5.4-1
(Landscape Cross Sections) identifies the
location of application. Subsection 5.3.1, Plant
Material Selection and Use, contains a
description of these classifications, and generally
describes the basic uses for each type of tree.

For each species, Planning Standard Detail No.
10 contains detailed information about the
character of the tree, including:
• maximum height and spread;
• spacing at installation;
• water use;
• intended use; and
• tree type.

Planning Standard Detail No. 10 identifies where
and how trees should be used, and the
appropriateness of each species for use in
different Realm areas. For the Private Realm,
any tree listed in the matrix may be utilized.

Planning Standard Detail No. 10 follows a similar
pattern by identifying the shrubs, vines and
ground cover by street location and application.

For each species, Planning Standard Detail No.
10 contains detailed information about the
character of the shrubs, vines and ground cover,
including:
• maximum height and spread;
• spacing at installation; and
• water use.

Planning Standard Detail No. 10 identifies where
and how shrubs, vines and ground cover should
be used, and the appropriateness of each
species for use in different Realm areas. For the
Private Realm, any shrubs, vines and ground
cover listed in the matrix may be utilized.

For Planning Standard Detail No. 10, a ‘P’
indicates that the particular plant has either the
quality indicated (in the case of the portion of the
matrix which describes the plant’s character), or
that the plant is preferred for the designation. A
solid dot indicates that the plant is acceptable for
the indicated use, and the absence of a dot
generally means that the plant should not be
used for the specified situation. Within the Private
Realm, the matrix may be interpreted more
freely; for example, it is acceptable for trees not
identified as specimens to be used as specimens
if planted in larger sizes (48” box, or larger). The
intent is to permit more flexibility for landscape
areas located in the Private Realm but visible
from the public right-of-ways.

Plants listed in Planning Standard Detail No. 10
should comprise at least 80% of the area to be
landscaped and 80% of the total list of plants to
be used within the Setback Realm and Public
Realm. Plants listed in Planning Standard No. 10
should also comprise at least 80% of the area to
be landscaped and 80% of the total list of plants
to be used within the Private Realm, where
visible from the public right-of-way. Ensuring
similar and complementary tree, shrubs, vines
and ground cover within both the Specific Plan
and The Anaheim Resort Public Realm
Landscape Program, and Planning Standard
Detail No. 10 will strengthen the overall
appearance of The Anaheim Resort.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-17
Planning Standard Detail No. 10 may be
amended from time-to-time by the Planning and
Building Director to update the matrices with
more current and contemporary plant nursery
offerings that are more drought, disease and/or
pest-resistant plantings.

For plantings within the Public Realm, Planning
Standard Detail No. 10 identifies the preferred
species and location. The Public Realm matrix
may be amended from time-to-time by the
Planning and Building Director and the Public
Works Director. All plants and trees in the Public
Realm shall be subject to the review and
approval of the City.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-18

5.4 Landscape Cross Sections
The Landscape Concept Diagram in Exhibit 5.4-1
(Landscape Cross Sections) shows the different
landscape treatments proposed for each of the
major public streets in the area. This Diagram is
intended to illustrate the overall planting design
concept and does not show the actual size or
placement of trees and other landscape
elements.

The following landscape cross sections are
intended to provide a general overview of the
different landscape treatments that will help
create the unifying identity for The Anaheim
Resort. They also show the approximate location
of the Public Realm, Setback Realm and Private
Realm on each public street in the ARSP area. In
this way they provide a key to Sections 5.6,
Design Criteria for the Public Realm, 5.7, Design
Criteria for the Setback Realm, and 5.8, Design
Criteria for the Public Realm, which contain more
detailed information about each Realm, including
the role of each Realm creating an overall
unifying identity and a description of the specific
components of each respective Realm.

The cross sections are not intended to illustrate
every condition that may occur within or adjacent
to the street right-of-way, nor do they contain
setback and right-of-way dimensions.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-19
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-20
Disneyland Drive
Exhibit 5.4-1 Disneyland Drive (North of Ball Road) Landscape Cross Section Private
Realm
Setback landscape to consist of trees,
shrubs, ground cover and/or turf; planting
design to be layered landscape
Private
Realm
Setback
Realm Public Realm Setback Realm
Street trees in parkway to
consist of closely spaced
vertical trees
Pedestrian sidewalk
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-21
Exhibit 5.4-2 Disneyland Drive (Between 825 feet n/o Katella Avenue and 1,350 feet n/o Katella Avenue) Landscape Cross Section
Private
Realm
Setback
Realm Public Realm Setback
Realm
Private
Realm
Planting on ground
may include shrubs,
ground cover and/or
turf
Setback landscape to consist of trees, shrubs,
and ground cover and/or turf.

Anaheim Resort
Specific Plan
Disneyland Resort
Specific Plan
Pedestrian sidewalk
Street trees in parkways and
median to consist of alternating
vertical trees and medium or
large canopy trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-22
West Street
Exhibit 5.4-3 West Street (South of Katella Avenue) Landscape Cross Section Private
Realm
Setback
Realm Public Realm Setback
Realm
Private
Realm
Parkway planting to consist of
medium or large canopy trees
Pedestrian sidewalk
Layered landscape in setback to consist of
trees, shrubs, vines, ground cover and/or turf
Planting on ground
may include ground
cover and/or turf
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-23
West Place
Exhibit 5.4-4 West Place Landscape Cross Section
Parkway landscape to consist of trees,
shrubs, ground cover and/or turf; planting
design to be layered landscape
Private
Realm
Private
Realm
Setback
Realm Public Realm Setback
Realm
Pedestrian Sidewalk
Planting on ground
may include ground
cover and/or turf
Small or medium canopy
tree as street tree
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-24
Disney Way
Exhibit 5.4-5 Disney Way (East of Clementine Street) Landscape Cross Section The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-25
Exhibit 5.4-6 Ultimate Katella Avenue (Between Interstate 5 and West Street/Disneyland Drive) Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-26
Exhibit 5.4-7 Ultimate Katella Avenue (Between Walnut Street and West Street/Disneyland Drive) Landscape Cross Section
Private
Realm
Private
Realm Public Realm Setback Realm
Setback
Realm
Layered landscape in setback consists of trees,
shrubs, ground cover and turf.

Double row of Date Palms
twenty-four feet (24) on center
Ground cover
may include
turf, ground
cover, or shrubs
Special light
fixtures with
banners in
parkway and
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-27
Walnut Street
Exhibit 5.4-8 Walnut Street Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-28
Harbor Boulevard
Exhibit 5.4-9 Harbor Boulevard (Between Chapman Avenue and Orangewood Avenue) Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-29
Exhibit 5.4-10 Harbor Boulevard (Orangewood to Manchester on the East Side and Orangewood to 150-250 Feet South of Manchester Avenue on the West Side) Landscape Cross Section
Private
Realm Public Realm Setback Realm
Medium or large canopy trees in parkway and
median, thirty-two feet (32') on center, typical
Vertical trees with vines planted at
base, thirty-two feet (32') on center,
typical
Layered landscape consisting of
trees, shrubs and/or ground cover
Private
Realm
Setback
Realm
Planting on
ground to consist
of barrier shrubs,
ground cover
and/or turf
Special light fixtures
with banners in
parkway and median,
typical
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-30
Exhibit 5.4-11 Harbor Boulevard (Between Manchester Avenue on the East Side and 150- 250 feet South of Manchester Avenue on the West Side to the Interstate 5 Interchange) Landscape Cross Section
Medium or large canopy trees in median
and parkway (as space permits), thirtytwo feet (32) on center, typical Special light fixtures
with banners in
parkway and median,
typical
Fence to be
planted with
vines
Public Realm Setback
Realm
Private
Realm
Fence to be
planted with
vines
Planting on ground
to consist of
shrubs, ground
cover and/or turf
Note: Planting of vines
and parkway tree as
shown subject to approval
of Caltrans and the City
Engineer.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-31
Exhibit 5.4-12 Harbor Boulevard (Interstate 5 to Vermont Avenue) Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-32
Ball Road
Exhibit 5.4-13 Ball Road (West of West Place) Landscape Cross Section The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-33
Exhibit 5.4-14 Ball Road (Between West Place and Cast Place) Landscape Cross Section Private
Realm
Setback
Realm
Private Public Realm
Realm
Medium or large canopy
trees to be planted in
landscaped parkways
Setback landscape to consist of trees,
shrubs, vines and ground cover
Painted
median
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-34
Exhibit 5.4-15 Ball Road (East of Cast Place) Landscape Cross Section The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-35
Clementine Street
Exhibit 4.4-16 Clementine Street Landscape Cross Section The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-36
Haster Street/Anaheim Boulevard
Exhibit 5.4-17 Haster Street/Anaheim Boulevard Landscape Cross Section The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-37
Convention Way
Exhibit 5.4-18 Convention Way Landscape Cross Section
Public Realm Setback
Realm
Private
Realm
Private
Realm
Setback
Realm
Pedestrian Sidewalk
Vertical palm where
possible in planting areas
Setback landscape to consist of trees, shrubs, ground
cover and/or turf; planting design to be layered landscape Regularly spaced planting;
alternating between palms and
canopy trees; barrier shrubs
and ground cover in median.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-38
Exhibit 5.4-19 Gene Autry Way Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-39
Manchester Avenue
Exhibit 5.4-20 West Manchester Avenue Landscape Cross Section Private
Realm
Setback
Realm Public Realm
Setback landscape to consist of trees, shrubs,
ground cover and/or turf; planting design to be
layered landscape.

Setback
Realm
Private
Realm
Street trees in parkways and
median to consist of alternating
vertical trees and small or
medium canopy trees
Pedestrian Sidewalk
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-40
Exhibit 5.4-21 North Manchester Avenue (Adjacent to Interstate 5, North of the Parking Overlay) Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-41
Exhibit 5.4-22 North Manchester Avenue (Adjacent to Interstate 5 and the Parking Overlay, North of Alro Way) Landscape Cross Section
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-42
Exhibit 5.4-23 Manchester Avenue, East of Anaheim Boulevard (Adjacent to Interstate 5) Landscape Cross Section
Interstate 5
Right-Of-Way
Pedestrian Sidewalk
Setback landscape to consist of trees, shrubs, ground
cover and/or turf; planting design to be layered landscape Public Realm Setback
Realm
Private
Realm
Street trees in
parkways to
consist of
alternating
vertical trees
and small or
medium canopy
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-43
Orangewood Avenue
Exhibit 5.4-24 Orangewood Avenue Landscape Cross Section Public Realm Private
Realm
Setback
Realm
Pedestrian Sidewalk
Planting on ground
may include ground
cover and/or turf
Parkway planting to consist
of medium or large canopy
trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-44
Chapman Avenue
Exhibit 5.4-25 Chapman Avenue Landscape Cross Section
Setback landscape to consist of trees,
shrubs, vines and ground cover
Public Realm Setback
Realm
Private
Realm
Medium or large canopy
trees to be planted in
existing landscaped median
Medium or large canopy trees to be
painted in landscaped parkway
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-45
Local Streets
Exhibit 5.4-26 Alro Way Landscape Cross Section
Public Realm Setback
Realm
Private
Realm
Pedestrian Sidewalk
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Planting on ground
may include ground
cover and/or turf
Small or medium
canopy tree as street
trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-46
Exhibit 5.4-27 Casa Vista Street Landscape Cross Section Public Realm Setback
Realm
Private
Realm
Pedestrian Sidewalk
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Planting on ground
may include ground
cover and/or turf
Small or medium
canopy tree as street
trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-47
Exhibit 5.4-28 Vermont Avenue Landscape Cross Section
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Private
Realm
Setback
Realm Public Realm
Small or medium
canopy tree as street
trees
Pedestrian Sidewalk
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-48
Exhibit 5.4-29 Wilken Way Landscape Cross Section
Public Realm Setback
Realm
Private
Realm
Pedestrian Sidewalk
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Planting on ground
may include ground
cover and/or turf
Small or medium
canopy tree as street
trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-49
Exhibit 5.4-30 Zeyn Street Landscape Cross Section
Public Realm Setback
Realm
Private
Realm
Pedestrian Sidewalk
Setback landscape to consist of trees,
shrubs, ground cover and/or turf;
planting design to be layered landscape
Planting on ground
may include ground
cover and/or turf
Small or medium
canopy tree as street
trees
The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-50

5.5 Identity Concept Plan
The Anaheim Resort Identity Program describes
how signs and other identity elements, such as
entry gateways and street furniture in the Public
Realm, and freestanding monument signs
identifying private businesses in the Setback
Realm, will help create the unified environment
envisioned for the entire Anaheim Resort. The
Anaheim Resort Identity Program was approved
by the City Council as a separate document. All
Public Realm Identity elements, as well as the
Freestanding Monument Sign Design, described
in the Anaheim Resort Identity Program are applicable to the entire Anaheim Resort.

This sign program for the ARSP will have the
following characteristics:
• Prior to installation, plans will be prepared
which show the location, sign type, and
message (or messages, in the case of a
changeable message sign) that will be used
for each sign in the ARSP area;
• Signs in the Public Realm (the ultimate public
right-of-way) and the freestanding monument
signs in the Setback Realm have been
designed as a family of signs with a consistent design vocabulary; and, • Consistent regulations for signs on private
property will make it easier for visitors to
quickly find their destination.

Additional important information about signs is
also contained elsewhere in the ARSP in Section

5.6, Design Criteria for the Public Realm; Section

5.7, Design Criteria for the Setback Realm; and
Section 1.1, Design Criteria for the Private
Realm. Section 7.0, Zoning and Development
Standards, contains the Anaheim Municipal Code
regulations which apply to signs in the ARSP
area.

The Anaheim Resort Specific Plan 5.0 Design Plan
DRAFT FOR PUBLIC REVIEW (SEPT 2023)
5-51

5.6 Design Criteria for the Public
Realm
Exhibit 5.6-1 The Three Elements of the
Design Hierarchy: The Public Realm, The
Setback Realm, and the Private Realm
Setback
Realm
Private
Realm
Public
Realm
Ultimate Public
Right-of-Way
Building
Setback
Buildable
Portion
Buiding
Envelope
As described in Section 5.2.7, Establish a Clear
Design Hierarchy, the Design Plan divides the
ARSP area into three segments: the Public
Realm, the Setback Realm, and the Private
Realm. The most visible segment, known as the
Public Realm, includes all the area within the
ultimate public right-of-way within the specific
plan area and includes public streets, street
medians, parkways and sidewalks. Because of
its visual prominence and because development
of this segment will primarily be implemented by
the City or other government agencies (i.e.,
Caltrans), more specific design solutions are
prescribed for the Public Realm than for the other
Realms. These design solutions are described in
The Anaheim Resort Public Realm Landscape
and Identity Programs, with supplemental
information provided in this section.

The primary design emphasis in the Public
Realm is to provide a streetscape design that
implements the major design concepts described
in the preceding sections. Adherence to the
streetscape design concepts for the Public
Realm is extremely important because of the
dominant role a street's image has in creating
The Anaheim Resort's identity. Creating a strong
identity is critically dependent on implementing a
consistent, high quality, streetscape treatment.

← All documents from this meeting