Cities Index.
Minutes, regular meeting, third session

Bakersfield City Council
November 4, 2026

Document
Minutes, regular meeting, third session
Meeting
November 4, 2026
Body
Bakersfield City Council
Pages
223
Original file
412.7 MB
Text extracted from the city's file for reading and search. Open the original on pub-bakersfield.escribemeetings.com. That file is the official record.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-19
Table 4.3-3 Ambient Air Quality Monitoring Summary
Pollutant/Standard
Number of Days Thresholds Were Exceeded
and
Maximum Levels1
2020 2021 2022 2023 2024
Ozone (O3)
State 1-Hour  0.09 ppm (days exceed threshold)
State & Federal 8-hour  0.070 ppm (State/Federal days
exceed threshold)
Max. 1-Hour Conc. (ppm)
Max. 8-Hour Conc. (ppm)
3 25/25

0.110

0.098
0 11/11

0.090

0.080
0 7/4

0.093

0.076
0 7/7

0.088

0.079
2 38/36

0.099

0.089
Nitrogen Dioxide (NO2)
State 1-Hour  0.18 ppm (days exceed threshold)
Max. 1-Hour Conc. (ppm)
0 0.0504
0 0.057
2 0

0.0536
0 0.057
7 0

0.056
6 Coarse Particulates (PM10)
State 24-Hour > 50 µg/m3 (days exceed threshold)
Federal 24-Hour > 150 µg/m3 (days exceed threshold)
Max. 24-Hour Conc. (µg/m3)
18 1
196.8
124
3 437.5
135
0 134.7
106
1 181.3
110
0 129.7
Fine Particulates (PM2.5)
Federal 24-Hour > 35 µg/m3 (days exceed threshold)
Max. 24-Hour Conc. (µg/m3)
44 150.7
40 72.3
34 58.1
9 63.7
15 71.9
Source: CARB 2026c.

Notes: ppm = parts per million; ppb = parts per billion; µg/m3 = micrograms per cubic meter; * = Data not available 1 Data obtained from the Bakersfield-5558 California Avenue Monitoring Station.

Sensitive Receptors
Some land uses are considered more sensitive to air pollution than others due to the types of population groups or activities involved. Sensitive population groups include children, the elderly, the acutely ill, and the chronically ill, especially those with cardiorespiratory diseases.

Residential areas are also considered sensitive receptors to air pollution because residents (including children and the elderly) tend to be at home for extended periods of time, resulting in sustained exposure to any pollutants present. Other sensitive receptors include retirement facilities, hospitals, and schools. Recreational land uses are considered moderately sensitive to air pollution. Although exposure periods are generally short, exercise places a high demand on respiratory functions, which can be impaired by air pollution. In addition, noticeable air pollution can detract from the enjoyment of recreation. Industrial, commercial, retail, and office areas are considered the least sensitive to air pollution. Exposure periods are relatively short and intermittent because the majority of the workers tend to stay indoors most of the time. In addition, the working population is generally the healthiest segment of the public.

Nearby off‐site sensitive receptors include the mobile-home park residences 750 feet to the west, single-family residences 800 feet to the southwest, and single-family residences 1,300 feet to the north of the Project Site. Additionally, there are two buildings approximately 200 to 450 feet west of the Project across El Toro Viejo Road. However, it is uncertain whether these two buildings currently house residents or are used for nonresidential purposes only. For purposes of the analysis, they are assumed as residential homes. Additionally, for purposes of the analysis, workers are also included as sensitive receptors. The nearest worker receptors are the off-site workers at the surrounding businesses.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-20

4.3.3 Impact Analysis
As stated in Appendix G of the CEQA Guidelines, the significance criteria established by the applicable air quality management district may be relied on to make the above determinations.

Thus, this analysis also evaluates the Project’s air quality impacts pursuant to SJVAPCD’s recommended guidelines and thresholds of significance, as discussed further below. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Conflict with or obstruct implementation of the applicable air quality plan. • Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard.
• Expose sensitive receptors to substantial pollutant concentrations. • Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people.

SJVAPCD developed the Guide for Assessing and Mitigating Air Quality Impacts (GAMAQI) and adopted the latest version on March 19, 2015. The current GAMAQI is the latest guidance for addressing air quality impacts in the SJVAB. Changes to the GAMAQI are primarily administrative in nature to update air basin information, attainment status, and general guidance to reflect updated conditions. The following thresholds of significance from the SJVAPCD’s GAMAQI are used to determine whether a Project would result in a significant air quality impact.

SJVAPCD has identified regional construction and operational emissions thresholds to determine a project’s cumulative impact on air quality in the SJVAB. Specifically, these thresholds gauge whether a project would significantly contribute to a nonattainment designation based on the mass emissions generated. Mass emissions from a project are not correlated with concentrations of air pollutants. Table 4.3-4, SJVAPCD Regional Criteria Air Pollutants Significance Thresholds, lists SJVAPCD’s regional significance thresholds. It should be noted that SJVAPCD Rule 9510 and Regulation VIII may not reduce project-specific construction and operational emissions to below the SJVAPCD thresholds.

Table 4.3-4 SJVAPCD Regional Criteria Air Pollutants Significance Thresholds Air Pollutant Construction and Operation Phase
Reactive Organic Gases (ROG) 10 tons/year
Carbon Monoxide (CO) 100 tons/year
Nitrogen Oxides (NOX) 10 tons/year
Sulfur Oxides (SOX) 27 tons/year
Coarse Particulates (PM10) 15 tons/year
Fine Particulates (PM2.5) 15 tons/year
Source: SJVAPCD 2015b.

Ambient Air Quality Analysis
The need to perform air quality dispersion modeling for typical urban development projects is determined on a case-by-case basis, depending on project size. SJVAPCD applies the following guidance in determining whether an ambient air quality analysis should be conducted for development projects. Compliance with Rule 9510 frequently reduces project-specific emissions to less than significant levels. However, for large construction projects, additional mitigation may Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-21
be required. SJVAPCD recommends that an ambient air quality analysis be performed for all pollutants when on-site emissions of any criteria pollutant from construction activities would equal or exceed any applicable threshold of significance for criteria pollutants, or 100 pounds per day of any criteria pollutant, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures. Similarly, SJVAPCD also recommends that an ambient air quality analysis be performed for all criteria pollutants when emissions of any criteria pollutant resulting from project operational activities exceed the 100 pounds per day screening level, after compliance with Rule 9510 requirements and implementation of all enforceable mitigation measures. For projects that exceed the100 pounds per day screening level, project-related concentrations are compared to the following National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) shown in Table 4.3-5, Ambient Air Quality Thresholds.

Additionally, if either the NAAQS and/or CAAQS are exceeded, the SJVAPCD developed the significant impact levels (SILs) shown in Table 4.3-6, SJVAPCD Significant Impact Levels, to determine whether a project’s contribution would contribute significantly to an AAQS exceedance.

Table 4.3-5 Ambient Air Quality Thresholds
Pollutant
Averaging
Period
NAAQS
µg/m3
CAAQS
µg/m3
NO2
1-hour 188.7 339
Annual 100 57
CO 1-hour 40,000 23,000
8-hour 10,000 10,000
SO2
1-hour 196 655
3-hour 1,300 n/a
24-hour 365 105
Annual n/a n/a
PM10
24-hour 150 50
Annual n/a 20
PM2.5
24-hour 35 n/a
Annual 12 12
Notes: NAAQS = National Ambient Air Quality Standard; CAAQS = California Ambient Air Quality Standard; μg/m3 = micrograms per cubic meter.

Table 4.3-6 SJVAPCD Significant Impact Levels
Pollutant
Averaging
Period
Class II Significant Impact Levels
µg/m3
NO2
1-hour 7.5
Annual 1
CO 1-hour 2.000
8-hour 500
SO2
1-hour 7.8
3-hour 25
24-hour 5
Annual 1
PM101
24-hour 10.4
Annual 2.08
PM2.51
24-hour 2.5
Annual 0.63
Source: SJVAPCD 2024.

Notes: μg/m3 = micrograms per cubic meter
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-22
Pollutant
Averaging
Period
Class II Significant Impact Levels
µg/m3
1 Because the proposed project is a land use development project and emissions would primarily be from non-point sources, the fugitive PM10 and PM2.5 SILs are utilized.

Consistency with the Applicable Air Quality Plan
SJVAPCD has prepared plans to attain federal and State AAQS. The significance thresholds in Table 4.3-4, SJVAPCD Regional Criteria Air Pollutants Significance Thresholds, are based on SJVAPCD’s New Source Review offset requirements for stationary sources. Emission reductions achieved through implementation of SJVAPCD’s offset requirements are a major component of SJVAPCD’s air quality plans. Thus, projects with emissions below the thresholds of significance for criteria pollutants would be determined to “not conflict or obstruct implementation of the [SJVAPCD’s] air quality plan.”
Odor
Odor impacts associated with a proposed project would be considered significant if the project has the potential to frequently expose members of the public to objectionable odors. There are two general scenarios where a project could expose people to substantial odors:
• Odor Generator. Projects that would potentially generate odorous emissions proposed to locate near existing sensitive receptors or other land uses where people may congregate. • Odor Receiver. Residential or other sensitive receptor projects or other projects built for the intent of attracting people locating near existing odor sources.

Due to the subjective nature of odor impacts, the number of variables that can influence the potential for an odor impact, and the variety of odor sources, there are no quantitative or formulaic methodologies to determine if potential odors would have a significant impact. Rather, projects must be assessed on a case-by-case basis. As shown in Table 4.3-7, SJVAPCD Screening Levels for Potential Odor Sources, the SJVAPCD has identified buffer distances for common types of facilities that have been known to produce odors in the SJVAB. The degree of odors could be significant and may be based on a review of SJVAPCD’s complaint records.

Table 4.3-7 SJVAPCD Screening Levels for Potential Odor Sources Land Use/Type of Operation Screening Distance
Wastewater Treatment Plant 2 miles
Sanitary Landfill 1 mile
Transfer Station 1 mile
Composting Facility 1 mile
Petroleum Refinery 2 miles
Asphalt Batch Plant 1 mile
Chemical Manufacturing 1 mile
Fiberglass Manufacturing 1 mile
Painting/Coating Operations 1 mile
Food Processing Facility 1 mile
Feed Lot/ Dairy 1 mile
Rendering Plant 1 mile
Source: SJVAPCD 2015b
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-23
For a project located near an existing source of odors, in California Building Industry Association v. Bay Area Air Quality Management District (CBIA), the California Supreme Court ruled that CEQA generally does not require an evaluation of impacts of the environment on a project unless a project will exacerbate an existing environmental hazard. 2 Health Risk Thresholds
Whenever a project would require use of chemical compounds that have been identified in SJVAPCD’s Rule 2201; placed on CARB’s air toxics list pursuant to AB 1807, Toxic Air Contaminant Identification and Control Act; or placed on the EPA’s National Emissions Standards for Hazardous Air Pollutants, a health risk assessment is warranted. If a project would place sensitive land uses proximate to major sources of TACs (roadways with over 50,000 vehicles per day or major stationary sources), a health risk assessment may also be warranted. Table 4.3-8, SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds, lists the SJVAPCD’s TAC incremental risk thresholds for operation of a project or placement of sensitive land uses proximate to major sources of air pollution. As stated under the CBIA ruling, though CEQA is generally not required to analyze impacts of the environment on a project, where a project will exacerbate an existing environmental hazard, CEQA requires an analysis of the worsened condition on future project residents and the public at large. However, projects that do not generate emissions that exceed the values in Table 4.3-8 would not substantially contribute to cumulative air quality hazards or exacerbate an existing environmental hazard.

Table 4.3-8 SJVAPCD Toxic Air Contaminants Incremental Risk Thresholds Risk Type Threshold
Cancer Risk1 ≥ 20 in 1 million
Hazard Index2 ≥ 1.0
Source: SJVAPCD 2015b.
1 For the Maximum Exposed Individuals (MEI).
2 Ground-level concentrations of noncarcinogenic TACs for the MEI.

Methodology
The air quality evaluation was prepared in accordance with the requirements of CEQA to determine if significant air quality impacts are likely in conjunction with the type and scale of development associated with the Project. Air pollutant and GHG emissions are calculated using the California Emissions Estimator Model (CalEEMod), version 2022.1. CalEEMod compiles an emissions inventory of construction (fugitive dust, off-gas emissions, on-road emissions, and off-road emissions), area sources, indirect emissions from energy use, mobile sources, indirect emissions from waste disposal (annual only), and indirect emissions from water/wastewater (annual only).

The analysis of electricity and natural gas usage for the Project is based on CalEEMod version 2022.1, which quantifies energy use associated with the proposed land uses. In addition, fuel consumption data from EMFAC2021 version 1.0.2 and OFFROAD version 1.1.3. are used to quantify fuel usage related to construction equipment operation and construction- and operation-related vehicle trips (e.g., construction worker trips and patron vehicle trips).

The full methodology as well as output from the model runs for both construction and operational activity are provided in Appendix B.
2 https://law.justia.com/cases/california/supreme-court/2015/s213478.html.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-24
Construction Emissions
The assumed construction activities, phasing, and construction equipment is based on information provided by the Project applicant and CalEEMod defaults. Demolition debris generated from the left turn lane installation would result in the export of 575 tons of demolition debris. The Project Site would be a balanced site and site preparation and grading activities would not result in export or import of soil. Emissions of VOCs would primarily be from the application of paints, asphalt pavement, and operation of construction vehicles and off-road equipment.

Emissions of NOX, CO, and SOX would primarily be generated from operation of off-road construction equipment as well as construction worker and vendor vehicles. Coarse and fine particulate matter (PM10 and PM 2.5) exhaust emissions would also be generated from operation of off-road construction equipment and construction and vendor vehicle trips. Fugitive dust emissions of PM10 and PM2.5 would be generated from ground disturbance activities and asphalt demolition.

Operational Emissions
The operational-phase, project-related emissions are based on development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed project. Construction emissions are based on information provided for the Project. Where specific information was not available, CalEEMod default values were utilized.

Project Impacts
Threshold AQ-1: Would the project conflict with or obstruct implementation of the applicable air quality plan?
Impact Analysis
The following describes potential air quality impacts and consistency of the proposed Project with AQMPs developed by the SJVAPCD and described above.

The SJVAPCD is responsible for reducing emissions from area, stationary, and mobile sources in the SJVAB to achieve the National and California AAQS. A consistency determination with the AQMPs plays an important role in local agency project review by linking local planning and individual projects to the AQMPs. It fulfills the CEQA goal of informing decision makers of the environmental efforts of the project under consideration early enough to ensure that air quality concerns are fully addressed. It also provides the local agency with ongoing information as to whether they are contributing to the clean air goals in the AQMPs.

Kern COG is one of SJVAPCD’s partners in the preparation of the AQMPs, providing the latest economic and demographic forecasts and developing transportation measures in Kern County.

Regional population, housing, and employment projections developed by Kern COG are based, in part, on a city’s general plan land use designations. These projections form the foundation for the emissions inventory of the AQMPs and are incorporated into the regional transportation plan/sustainable communities strategy (RTP/SCS) prepared by Kern COG to determine priority transportation projects and vehicle miles traveled in the Kern COG region. Because the AQMPs’ strategies are based on projections from local general plans, projects that are consistent with the local general plan are considered consistent with the air quality-related regional plan. Additionally, only large projects have the potential to substantially affect the demographic forecasts in the AQMPs.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-25
The Project’s proposed land uses are not permitted under the existing P land use designation. A general plan amendment would be required to change the land use designation from P to LI to allow for uses permitted under the C-O (Professional and Administrative Office), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zones.

Also, under CEQA Guidelines Section 15206(b), a proposed project is considered of statewide, regional, or area-wide significance if the project is a commercial office building of 250,000 square feet or more or employs 1,000 or more employees and/or a shopping center of 500,000 square feet or more or employs 1,000 or more employees. The amount of retail space proposed and the projected number of new jobs generated would be less than 500,000 square feet and 1,000 employees. Thus, the Project would not substantially affect demographic projections beyond what is accounted for in the AQMPs.

However, per SJVAPCD guidance, project consistency with the AQMPs is based on whether project emissions would exceed the SJVAPCD regional significance thresholds. As discussed in Threshold AQ-2, the Project would exceed the regional operation significance thresholds for VOC and NOX and would cumulatively contribute to the nonattainment designations in the SJVAB without mitigation.

Therefore, the Project would implement Mitigation Measure (MM) AQ-1, which would require a Voluntary Emission Reduction Agreement (VERA) for the Project; MM AQ-2, which restricts paints and coatings that can be used for the Project; and MM GHG-3, which requires landscaping equipment to be all electric. As further described under Impact AQ-2, implementation of these MMs, in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510, would, at minimum, offset the amount of Project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Implementation of MM AQ-1 would also ensure consistency of the proposed project with the applicable SJVAPCD air quality plans and ensure that operation of the Project would not cumulatively contribute to the nonattainment designations of the SJVAB. Therefore, impacts would be significant with mitigation incorporated.

Mitigation Measures
Refer to MM AQ-1 and MM AQ-2 below under Impact AQ-2. In addition, please also refer to MM GHG-1 through MM GHG-3 in Section 4.8, Greenhouse Gas Emissions, of this Draft EIR.

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Threshold AQ-2: Would the project result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard?
Impact Analysis
Regional Construction Emissions
Construction activities associated with the Project would temporarily increase PM10, PM2.5, VOC, NOX, SOX, and CO regional emissions in the SJVAB. The primary source of NOX, CO, and SOX emissions is the operation of construction equipment. The primary sources of particulate matter (PM10 and PM2.5) emissions are activities that disturb the soil, such as grading and excavation, Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-26
asphalt demolition, and building construction. The primary source of VOC emissions is the application of architectural coating and off-gas emissions associated with asphalt paving.

Construction air pollutant emissions are based on the preliminary construction information provided by the Project applicant and CalEEMod defaults. Construction would entail site preparation, grading, utility trenching, construction of the proposed buildings, architectural coating, and asphalt paving. The Project would also include installation of a left-turn lane on Rosedale Highway in addition to the installation of a traffic signal in the southeast corner of Coffee Road and Jet Way. An estimate of maximum daily construction emissions for the Project is provided in Table 4.3-9, Annual Regional Construction Emissions.

Table 4.3-9 Annual Regional Construction Emissions
Construction Year
Criteria Air Pollutants
(tons per year)
VOC1 NOX CO SOX PM10 PM2.5
Phase 1
Year 2026 1 1 1 <1 <1 <1
Maximum Annual
Emissions 1 1 1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Phase 2
Year 2027 <1 <1 1 <1 <1 <1
Maximum Annual
Emissions <1 <1 1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Left-Turn Lane
Year 2026 <1 <1 <1 <1 <1 <1
Maximum Annual
Emissions <1 <1 <1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Traffic Signal
Year 2026 <1 <1 <1 <1 <1 <1
Maximum Annual
Emissions
<1 <1 <1 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Overall Project Buildout2
Year 2026 1 1 2 <1 <1 <1
Year 2027 <1 <1 1 <1 <1 <1
Maximum Annual Emissions 1 1 2 <1 <1 <1
SJVAPCD Threshold 10 10 100 27 15 15
Significant? No No No No No No
Source: CalEEMod Version 2022.1.
1 The proposed project would include 601,224 square feet of surface parking lot asphalt paving and 462,790 square feet of non-parking lot asphalt paving for a total of 1,063,714 square feet of asphalt surfaces. However, the modeled VOC emissions results shown in this table are based on 1,485,982 square feet of asphalt surfaces and represents a conservative estimate. 2 Includes Phase 1 and 2 and the off-site improvements (i.e., left-turn lane and traffic signal).

As shown in Table 4.3-9, Annual Regional Construction Emissions, construction activities associated with the Project would not result in short-term emissions that would exceed the SJVAPCD regional thresholds for any of the air quality pollutants. Thus, construction of the Project Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-27
would not result in emissions that cumulatively contribute to the nonattainment designations of the SJVAB.

Ambient Air Quality
The SJVAPCD requires dispersion modeling for projects that result in average daily construction-related emissions that exceed the screening criteria of 100 pounds per day. As shown in Table 4.3-10, Average Daily Construction-Related Emissions, the project-related construction activities would not generate emissions that would exceed the 100 pounds per day screening criteria. Therefore, project-related construction activities would not cause or contribute to a violation of the ambient air quality standards.

Table 4.3-10 Average Daily Construction-Related Emissions Construction Phase
Criteria Air Pollutants
(pounds/day)1
VOC NOX CO SO2 PM10 PM2.5
Phase 1 Construction Related Emissions2 11 8 14 <1 2 1
Phase 2 Construction Related Emissions3 5 6 12 <1 2 <1
Left-Turn Lane Construction Related Emissions4 <1 3 4 <1 1 <1 Traffic Signal Construction Related Emissions5 <1 <1 1 <1 <1 <1 Overall Project Construction Related Emissions6 8 8 14 <1 2 1 SJVAPCD Ambient Air Quality Screening
Threshold 100 100 100 100 100 100
Exceeds Thresholds? No No No No No No
Source: CalEEMod Version 2022.1.
1 Based on the preliminary information provided by the project applicant. Where specific information regarding project-related construction activities was not available, construction assumptions were based on CalEEMod defaults, which are based on construction surveys conducted by South Coast AQMD of construction equipment and phasing for comparable projects. 2 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 206 days. 3 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 145 days. 4 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 31 days. 5 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 40 days. 6 Average daily emissions are calculated by dividing the total annual emissions by the total number of workdays estimated at 351 days.

Operational
Regional Emissions
Operation of the Project would generate criteria air pollutant emissions from area sources (e.g., landscaping equipment, architectural coating) and energy (i.e., natural gas used for heating and cooking). Table 4.3-11, Annual Regional Operation Emissions, shows the criteria pollutant emissions that would be generated by each development phase as well as full buildout of the Project. As shown in the table, operation of the Project at full buildout would result in exceedance of the SJVAPCD regional emissions threshold for VOC and NOX, primarily due to project-related mobile-sources. Both VOC and NOX are ozone precursors. NOX is also a precursor to the formation of particulate matter (PM10 and PM2.5). Thus, emissions of VOC and NOX that exceed the respective SJVAPCD regional thresholds would cumulatively contribute to the O3, PM10, and PM2.5 nonattainment designations of the SJVAB. Therefore, without any reduction measures, operation of the Project would contribute to the nonattainment designation of the SJVAB.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-28
Table 4.3-11 Annual Regional Operation Emissions
Source
Criteria Air Pollutants
(tons per year)
VOC NOx CO SO2 PM10 PM2.5
Phase 1 (2026 Opening Year)
Mobile1,2 12 9 64 <1 12 3
Area 2 <1 1 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 13 9.7 65 <1 12 3
Phase 2 (2027 Opening Year)
Mobile1,3 1 1 8 <1 2 <1
Area <1 <1 <1 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 2 1 8 <1 2 <1
Full Buildout (2027 Full Buildout Year)
Mobile1,3 13 10 68 <1 13 3
Area 2 <1 2 <1 <1 <1
Energy <1 <1 <1 <1 <1 <1
Total 15 10.3 70 <1 13 4
SJVAPCD Regional Threshold 10 10 100 27 15 15
Exceeds Threshold? Yes Yes No No No No
Source: CalEEMod Version 2022.1.
1 Based on trip generation data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2026 emissions data.
3 Based on calendar year 2027 emissions data.

Ambient Air Quality Analysis
The SJVAPCD requires dispersion modeling for projects that result in average daily operation-related emissions that exceed the average daily emissions screening criteria of 100 pounds per day. As shown in Table 4.3-12, Average Daily Operation-Related Emissions, the project-related operation-phase activities under full buildout conditions would result in average daily emissions that would exceed the 100 pounds per day screening criteria for CO.

Table 4.3-12 Average Daily Operation-Related Emissions
Operation Phase
Criteria Air Pollutants
(pounds per day)1
VOC NOX CO SO2 PM10 PM2.5
Operation Related Emissions 80 56 385 1 73 19
SJVAPCD Ambient Air Quality Screening
Threshold 100 100 100 100 100 100
Exceeds Thresholds? No No Yes No No No
Source: CalEEMod Version 2022.1.
1 The average daily emissions are calculated by dividing the annual emissions by 365 days, which is the assumed number of workdays the project would operate annually.

In accordance with SJVAPCD methodology, because the Project would result in exceeding the ambient air quality screening threshold for CO, dispersion modeling was conducted using AERMOD, version 13.0. The calculated concentration levels associated with project operation are shown in Table 4.3-13, Ambient Air Quality Analysis Summary.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-29
Table 4.3-13 Ambient Air Quality Analysis Summary
Pollutant
Averaging
Period
Background
µg/m3
Project
Operation
µg/m3
Project +
Background
NAAQS
µg/m3
CAAQS
µg/m3
NO2
1-hour 96.3 0.69 97.0 188.7 339
Annual 62.8 0.13 63.0 100 57
CO 1-hour 1,664 55.6 1,719 40,000 23,000
8-hour 916 37.4 953 10,000 10,000
SO2
1-hour 77.3 0.10 77.4 196 655
3-hour 50.0 0.09 50.1 1,300 n/a
24-hour 11.3 0.05 11.3 365 105
Annual 7.07 0.04 7.11 n/a n/a
PM10
24-hour 93.0 3.74 96.7 150 50
Annual 49.6 1.69 51.3 n/a 20
PM2.5
24-hour 37.2 1.07 38.3 35 n/a
Annual

12.90 0.48 13.38 12 12
Notes: Bold = Value exceeds either the NAAQS and/or CAAQS; Ambient air quality analysis modeling output provided in Appendix B (3&4); NAAQS = National Ambient Air Quality Standard; CAAQS = California Ambient Air Quality Standard; μg/m3 = micrograms per cubic meter As shown in Table 4.3-13, project-related operation activities would not generate emissions that would result in concentrations exceeding the ambient air quality standards for NO2 (1-hour), SO2 and CO when added to background concentrations. However, background concentrations of NO2 (Annual), PM10 and PM2.5 already exceed the AAQS. For these pollutants, the SJVAPCD has developed significant impact levels to determine whether a project’s contribution will contribute significantly to an AAQS exceedance.

Table 4.3-14, Comparison of Concentrations to Significant Impact Levels, compares the incremental increase in NO2, PM10 and PM2.5 concentrations resulting from project operations to the SJVAPCD significant impact levels. The Project’s modeled NO2, PM10 and PM2.5 concentrations are below the SJVAPCD significance levels for 24-hour and annual average concentrations.

Table 4.3-14 Comparison of Concentrations to Significant Impact Levels Pollutant
Averaging
Period
Project Operation
µg/m3
SIL
µg/m3
NO2 Annual 0.13 1.0
PM10
24-hour 3.73 10.4
Annual 1.69 2.08
PM2.5
24-hour 1.07 2.5
Annual 0.48 0.63
Note: Ambient Air Quality Analysis modeling output provided in Appendix B (3&4). SIL = significant impact level; μg/m3 = micrograms per cubic meter However, implementation of MM AQ-2 would provide onsite reductions in VOC emissions associated with coatings and paints used for the building exterior surfaces and parking lot striping.

Furthermore, implementation of MM GHG-1 through MM GHG-3 (see Section 4.9, Greenhouse Gas Emissions) could also provide VOC reductions generated from building energy use, property management landscaping equipment, and project-related vehicle trips. Table 4.3-15, Annual Regional Operation Emissions With Mitigation, shows the project-related annual emissions at full buildout with incorporation of MM AQ-2 (low VOC content paints) and MM GHG-3 (electric-powered landscaping equipment) in addition to the net change compared to the project-related annual emissions at full buildout without the mitigation measures.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-30
As shown in Table 4.3-15, Annual Regional Operation Emissions With Mitigation, the Project would still exceed the SJVAPCD significance thresholds for VOC and NOX with incorporation of MM AQ-2 and MM GHG-3. However, the amount exceeded for these two criteria air pollutants would be addressed through implementation of MM AQ-1, which would require a VERA for the Project. In general, a VERA provides pound-for-pound mitigation of air pollutant emissions through a process that funds and implements emission reduction projects through the SJVAPCD emission reduction incentive grant program.

Table 4.3-15 Annual Regional Operation Emissions With Mitigation Source
Maximum Daily Emissions (tons per year)
VOC NOx CO SO2 PM10 PM2.5
Full Buildout (2027 Full Buildout Year) Without
Mitigation
Mobile1,2 13 10 68 <1 13 3
Area 1.98 0.01 1.59 9.47E-5 2.81E-3 2.13E-3
Energy <1 <1 <1 <1 <1 <1
Total 14.56 10.29 70.26 0.16 13.32 3.50
Full Buildout (2027 Full Buildout Year) With
Mitigation
Mobile1,2 13 10 68 <1 13 3
Area3 1.69 0 0 0 0 0
Energy <1 <1 <1 <1 <1 <1
Total 14.27 10.28 68.67 0.16 13.32 3.50
SJVAPCD Regional Threshold 10 10 100 27 15 15
Exceeds Threshold? Yes Yes No No No No
Net Change
Mobile 0 0 0 0 0 0
Area (0.29) (0.01) (1.59) (9.47E-5) (2.81E-3) (2.13E-3) Energy 0 0 0 0 0 0
Total (0.29) (0.01) (1.59) (9.47E-5) (2.81E-3) (2.13E-3) Source: CalEEMod Version 2022.1.

Notes: (“ “) = negative value
1 Based on trip generation data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2027 emissions data.
3 Includes implementation of MM AQ-2, which requires use of paints and coatings with a VOC content of 25 grams per liter or less, and MM GHG-3 (see Section 4.9, Greenhouse Gas Emissions), which requires all landscaping equipment to be electric-powered.

Thus, implementation of MM AQ-1—in addition to compliance with the Indirect Source Review program under SJVAPCD Rule 9510—would, at minimum, offset the amount of project-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds.

As such, impacts would be less than significant with mitigation incorporated.

Mitigation Measures
In addition to the mitigation measures provided below, please also refer to MM GHG-1 through MM GHG-3 in Section 4.8, Greenhouse Gas Emissions, of this Draft EIR.

MM AQ-1 Prior to issuance of building permits, the project applicant shall enter into a Voluntary Emission Reduction Agreement (VERA) with the San Joaquin Valley Air Pollution Control District (SJVAPCD) to mitigate regional air quality impacts associated with emissions of VOC and NOX generated by operation of the proposed project. At minimum, the VERA shall be crafted and shown to mitigate project-related operation emissions to below the SJVAPCD regional significance thresholds for VOC and NOX. Prior to the issuance of building permits, the project applicant shall provide documentation to the City of Bakersfield Development Services Department (City), that verifies, to the City’s satisfaction, completion of the VERA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-31
MM AQ-2 The project proponent/developer shall use paints and coatings with a VOC content of 25 grams per liter or less for all initial and future exterior coating and recoating of structures including parking lot striping. This reduced VOC content requirement shall be incorporated into all site plans and appropriate construction documents (e.g., construction management plan) and submitted to the City of Bakersfield Development Services Department.

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Threshold AQ-3: Would the project expose sensitive receptors to substantial pollutant concentrations?
Impact Analysis
Construction and operation of the Project could generate new sources of criteria air pollutants and TACs. The following describes potential localized air quality impacts from implementation of the Project to the nearby off-site sensitive receptors.

Operational Phase Health Risks to Off-Site Receptors
The types of land uses that typically generate substantial quantities of TACs are industrial (permitted stationary sources) and warehousing (truck idling) land uses. These types of major air pollutant emissions sources are not proposed under the Project. The Project would develop retail and commercial (e.g., medical office, self-storage, and health club) land uses. Operation of the proposed uses could include occasional use of landscaping equipment and natural gas consumption for heating. However, air pollutant emissions generated from these activities would be nominal.

The Project would include a gas station with up to 40 fuel dispensers. CARB recommends avoiding siting gas stations within 500 feet of sensitive land uses to avoid exposing sensitive receptors to substantial concentration of air pollutants. The nearest potential sensitive land uses to the proposed gas station would be the two buildings across El Toro Viejo Road, approximately 650 feet to the west, which would be outside the 500-foot buffer. Furthermore, emissions of TACs from stationary sources that may be associated with the proposed uses (e.g., restaurant chain-driven char broiler), including the proposed gas station, would be subject to further study and health risk assessment prior to the issuance of any necessary air quality permits under SJVAPCD Regulation II. Regulation II would ensure that stationary source emissions (permitted sources) would be reduced or mitigated below SJVAPCD significance thresholds of 20 in one million cancer risk and one for acute risk at the maximally exposed individual.

In addition to stationary sources, the Project could generate heavy-duty trucks associated with the delivery of goods and supplies to the proposed retail and commercial uses, which would result in heavy-duty truck travel along the local roadways.

Per City of Bakersfield Municipal Code Section 10.44.060, Truck Routes Established—Signs— Parking Restrictions, Rosedale Highway and Coffee Road are designated truck routes. Based on the Project Site location, it is anticipated that any project-related heavy-duty truck travel would primarily occur on these two roadways. Per CARB land use siting guidelines, it is recommended to avoid siting sensitive land uses within 500 feet of urban roadways and freeways with 100,000 vehicles per day, or rural roads with 50,000 vehicles per day to avoid exposing sensitive receptors to substantial concentration of air pollutants. Overall, while the Project could generate heavy- Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-32
duty truck travel along the local roadways, the Project would only incrementally increase average daily trips for all vehicle types (i.e., passenger vehicles, heavy-duty trucks, etc.) by up to 5,934 average daily trips along the local roadways.

Because the Project would not have any warehousing uses and would primarily consist of retail, restaurant, and commercial uses, it anticipated that project-related traffic volumes would primarily consist of passenger vehicles associated with patrons. Thus, the incremental increase in vehicle trips that could result from implementation of the proposed Project would be below roadway volumes identified by the CARB land use siting screening criteria to avoid exposing sensitive receptors to substantial concentration of air pollutants from vehicles traveling along roadway.

Therefore, operation of the Project would not expose nearby off-site sensitive receptors to substantial concentrations of TACs. Impacts would be less than significant.

CO Hotspots
Areas of vehicle congestion have the potential to create pockets of CO called hotspots. These pockets have the potential to exceed the State 1-hour standard of 20 ppm or the 8-hour standard of 9.0 ppm. Because CO is produced in greatest quantities from vehicle combustion and does not readily disperse into the atmosphere, adherence to AAQS is typically demonstrated through an analysis of localized CO concentrations. Hotspots are typically produced at intersections, where traffic congestion is highest because vehicles queue for longer periods and are subject to reduced speeds. However, emissions from motor vehicles, the largest source of CO emissions, have been declining since 1985, despite increases in VMT, due to the introduction of new automotive emission controls and fleet turnover.

Furthermore, under existing and future vehicle emission rates, a project would have to increase traffic volumes at a single intersection to more than 44,000 vehicles per hour—or 24,000 vehicles per hour where vertical and/or horizontal air does not mix—in order to generate a significant CO impact. Buildout of the Project would generate up to 1,183 peak-hour trips. Overall, implementation of the Project would result in overall peak hour turning volumes between 352 to 6,865 for the intersections considered in the traffic study and would not produce the volume of traffic required to generate a CO hotspot. Therefore, implementation of the Project would not have the potential to substantially increase CO hotspots at intersections in the vicinity of the Project Site. Impacts would be less than significant.

Construction Health Risks to Off-Site Receptors
Project-related construction activities would temporarily elevate concentrations of TACs and DPM in the vicinity of sensitive land uses. The primary sources of TACs and DPM would be exhaust generated from construction off-road equipment and construction vendor and haul-truck trips. The proposed Project would be developed in two development phases over an approximately 16- month duration from March 2026 to July 2027. The estimated excess lifetime cancer risk and chronic noncancer hazard index at the nearest sensitive receptors are shown in Table 4.3-16, Construction Risk Summary.

Table 4.3-16 Construction Risk Summary
Receptor
Cancer Risk (per
million) Chronic Hazards
Maximum Exposed Individual Resident 1.5 0.003
Maximum Exposed Individual Worker 0.3 0.031
SVJAPCD Significance Thresholds 20 1.0
Exceeds Threshold? No No
Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-33
Note: Cancer risk calculated using 2015 OEHHA HRA guidance (OEHHA 2015).

The results of the HRA are based on the maximum modeled receptor concentration over the construction exposure period, conservatively assuming a 24-hour per day outdoor exposure and averaged over a 70-year lifetime.

As shown in Table 4.3-16, the maximum incremental cancer risk levels during the construction phase of the Project at the Maximum Exposed Individual Resident (MEIR) and Maximum Exposed Individual Worker (MEIW) are 1.5 per million and 0.3 per million, respectively, which would not exceed the cancer risk significance threshold of 20 in one million. For noncarcinogenic effects, the hazard index identified for each toxicological endpoint totaled less than one for the MEIR and MEIW. Therefore, chronic noncarcinogenic hazards are within acceptable limits, and project-related construction activities would not expose nearby sensitive receptors to substantial pollutant concentrations. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold AQ-4: Would the project result in other emissions (such as those leading to odors) adversely affecting a substantial number of people? Impact Analysis
The type of facilities that are considered to have objectionable odors include wastewater treatment plants, compost facilities, landfills, solid waste transfer stations, fiberglass manufacturing facilities, paint/coating operations (e.g., auto body shops), dairy farms, petroleum refineries, asphalt batch plants, chemical manufacturing, and food manufacturing facilities. The uses proposed by the Project do not fall within these land uses.

During project-related construction activities, construction equipment exhaust and application of asphalt and architectural coatings would temporarily generate odors. However, any construction-related odor emissions would be temporary and intermittent. Additionally, noxious odors would be confined to the immediate vicinity of the construction equipment. By the time such emissions reached any sensitive receptor, they would be diluted to well below any level of air quality concern.

Furthermore, short-term construction-related odors are expected to cease upon the drying or hardening of odor-producing materials. Thus, overall, construction and operation of the Project are not expected to generate odors that would adversely affect a substantial number of people.

Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.3 Air Quality
City of Bakersfield – SCH No. 2025101507 4.3-34
Cumulative Impacts
Impact Analysis
In accordance with SJVAPCD’s methodology, any project that produces a significant project-level regional air quality impact in an area that is in nonattainment contributes to the cumulative impact.

The greatest source of emissions in the SJVAB is mobile sources. Due to the extent of the area potentially impacted from cumulative emissions (i.e., the SJVAB), SJVAPCD considers a project cumulatively significant when project-related emissions exceed the SJVAPCD regional emissions thresholds shown in Table 4.3-4.

Construction
The SJVAB is designated nonattainment for O3 and PM2.5 under the California and National AAQS, and nonattainment for PM10 under the California AAQS. Construction of cumulative projects will further degrade the regional and local air quality. Air quality will be temporarily impacted during construction activities. However, construction emissions associated with the proposed Project would not exceed the SJVAPCD’s regional construction emissions thresholds.

Therefore, the project’s contribution to cumulative air quality impacts would be less than cumulatively considerable.

Operation
For operational air quality emissions, any project that does not exceed or can be mitigated to less than the daily regional threshold values is not considered by the SJVAPCD to be a substantial source of air pollution and does not add significantly to a cumulative impact. Incorporation of MM AQ-1, which would require the Project applicant to enter into a VERA with the SJVAPCD, would, at minimum, offset the amount of project-operation-related regional emissions of VOC and NOX that exceed their SJVAPCD regional significance thresholds. Furthermore, with implementation of mitigation measures, the proposed Project would be consistent with regional plans to reduce air pollution. Therefore, the Project’s operational phase air pollutant emissions would not be cumulatively considerable. Level of Significance After Mitigation Impacts related to air quality would be less than significant.

Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Level of Significance After Mitigation
Not applicable. Project-specific impacts would be less than significant and there would be no cumulative impacts related to aesthetics.

City of Bakersfield – SCH No. 2025101507 4.4-1

4.4 Biological Resources
This section discusses impacts associated with the potential for the proposed Riverview Market Commercial Project (Project) to result in adverse impacts to biological resources, including special-status species, riparian habitats, sensitive natural communities, protected wetlands, and migratory or wildlife movement corridors. This section also discusses the Project’s consistency with local plans and ordinances that protect biological resources. The analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to biological resources.

Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance), and a General Biological Assessment (GBA) dated May 2026, prepared for the Project by Hernandez Environmental Services (HES), and included in Appendix C, General Biological Assessment, to this Draft EIR.

During the scoping period for the Project’s Environmental Impact Report (EIR), comments were received in response to the Notice of Preparation (NOP) regarding biological resources. These comments are included in Appendix A-2, Notice of Preparation Comments, of this Draft EIR and are summarized below and addressed throughout this section:
• Request for preparation of a biological assessment including database search and field surveys to determine if special-status species are located on the Project Site. • Request for analysis for potential special-status animal species on the Project Site, including the San Joaquin kit fox, Swainson’s hawk, western burrowing owl, Crotch’s bumble bee, American badger, Bakersfield legless lizard, and the western spadefoot toad. • Recommendation to implement mitigation for pre-construction surveys, buffers, etc. for potential special-status animal species on the Project Site, including the San Joaquin kit fox, Swainson’s hawk, western burrowing owl, Crotch’s bumble bee, American badger, Bakersfield legless lizard, and the western spadefoot toad. • Recommendation to implement mitigation for nesting birds. • Request to include a Project alternative to avoid impacts to biological resources. • Recommendation to confirm California Natural Diversity Database (CNDDB) records results for the Project with a field survey on the Project Site. • Comment noting filing fees required by the California Department of Fish and Wildlife (CDFW).

4.4.1 Regulatory Setting
Federal
Federal Endangered Species Act of 1973
The Federal Endangered Species Act (FESA) (16 U.S.C. § 1531 et seq.) provides for the listing of endangered and threatened plant and animal species and the designation of critical habitat for these listed species. Section 09 of the FESA regulates the “taking” of any endangered fish or wildlife species. Section 7 of the FESA requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) or National Marine Fisheries Service (NMFS) to ensure that their Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-2
actions will not adversely impact listed species or modify designated critical habitat. Consultation results in the USFWS issuing a concurrence letter stating that a federal action would not harm a listed species or a biological opinion (BO) that identifies the limits of any “take” of a listed species due to the federal action. Section 7 of the FESA provides for permitting of projects where interagency cooperation is necessary to ensure that a federal action/decision does not jeopardize the existence of a listed species. Section 10 of the FESA applies to non-federal parties and private landowners and provides for issuance of incidental take permits in conjunction with the development of habitat conservation plans (HCPs).

Migratory Bird Treaty Act
The Migratory Bird Treaty Act of 1918 (MBTA)(16 U.S.C. §703 et seq.) implemented treaties with several countries on the conservation and protection of migratory birds. The number of bird species covered by the MBTA is extensive and is listed at 50 Code of Federal Regulations (CFR) Part 10.13. USFWS enforces the MBTA, which prohibits “by any means or in any manner, to pursue, hunt, take, capture, [or] kill” any migratory bird, or attempt such actions, except as permitted by regulation.

Clean Water Act
Pursuant to Section 404 of the Clean Water Act (CWA)(33 U.S.C. §§ 1251-1387), the U.S. Army Corps of Engineers (USACE) is authorized to regulate any activity that would result in the discharge of dredged or fill material into waters of the U.S. (including wetlands), which includes those waters listed in 33 CFR § 328.3 (as amended at 80 Federal Register [FR] 37104, June 29, 2015).

The USACE, with oversight from the U.S. Environmental Protection Agency (USEPA), has the principal authority to issue CWA Section 404 permits. The USACE would require a Standard Individual Permit for more than minimal impacts to waters of the U.S. as determined by the USACE. Projects with minimal individual and cumulative adverse effects on the environment may meet the conditions of an existing Nationwide Permit or Regional General Permit.

A water quality certification or waiver pursuant to Section 401 of the CWA is required for all Section 404 permitted actions. The Regional Water Quality Control Board (RWQCB), a division of the State Water Resources Control Board (SWRCB), provides oversight of the Section 401 certification process in California. The RWQCB is required to provide “certification that there is reasonable assurance that an activity that may result in the discharge to waters of the United States will not violate water quality standards.” Water Quality Certification must be based on the finding that a proposed discharge will comply with applicable water quality standards.

National Pollutant Discharge Elimination System
The National Pollutant Discharge Elimination System (NPDES) is the permitting program for discharge of pollutants into surface waters of the U.S. under Section 402 of the CWA. This federal program has been delegated to the State of California for implementation through the SWRCB and the nine RWQCBs.

State
California Endangered Species Act
The California Endangered Species Act (CESA)(FGC, Sections 2050 – 2089.25), in combination with the California Native Plant Protection Act of 1977 (NPPA)(FGC §1900 et seq.), regulates the Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-3
listing and take of plant and animal species designated as endangered, threatened, or rare within the state. California also lists species of special concern (CSSC) based on limited distribution, declining populations, diminishing habitat, or unusual scientific, recreational, or educational value.

CESA defines an endangered species as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant which is in serious danger of becoming extinct throughout all, or a significant portion, of its range due to one or more causes, including loss of habitat, change in habitat, overexploitation, predation, competition, or disease.” The CESA defines a threatened species as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that, although not presently threatened with extinction, is likely to become an endangered species in the foreseeable future in the absence of the special protection and management efforts required by this chapter. Any animal determined by the California Fish and Game Commission (CFGC) as rare on or before January 1, 1985 is a threatened species.” Candidate species are defined as “a native species or subspecies of a bird, mammal, fish, amphibian, reptile, or plant that the commission has formally noticed as being under review by the department for addition to either the list of endangered species or the list of threatened species, or a species for which the CFGC has published a notice of proposed regulation to add the species to either list.” Candidate species may be afforded temporary protection as though they were already listed as threatened or endangered at the discretion of the CFGC. Unlike the FESA, the CESA does not list invertebrate species.

Sections 2080 through 2085 of CESA address the take of threatened, endangered, or candidate species by stating “no person shall import into this state, export out of this state, or take, possess, purchase, or sell within this state, any species, or any part or product thereof, that the commission determines to be an endangered species or a threatened species, or attempt any of those acts, except as otherwise provided.” Under CESA, “take” is defined as to “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill.” Exceptions authorized by the State to allow “take” require permits or memoranda of understanding and can be authorized for endangered species, threatened species, or candidate species for scientific, educational, or management purposes and for take incidental to otherwise lawful activities. FGC Sections 1901 and 1913 provide that notification is required prior to disturbance. CDFW is responsible for assessing development projects for their potential to impact listed species and their habitats.

State-listed species are addressed through the issuance of a 2081 Permit (Memorandum of Understanding).

California Environmental Quality Act
The California Environmental Quality Act (CEQA)(Pub. Res. Code Sections 21000–21189) was established in 1970 as California’s counterpart to the National Environmental Policy Act (NEPA) (42 USC § 4321 et seq.). This statute requires State and local agencies to identify significant environmental impacts related to their actions and to avoid or mitigate those impacts, where feasible.

A public agency must comply with CEQA when it undertakes an activity defined by CEQA as a "project." A project is an activity undertaken by a public agency or a private activity subject to discretionary approval from a government agency that may cause either a direct physical change in the environment or a reasonably foreseeable indirect change in the environment.

California Fish and Game Code Sections 1600-1602
Pursuant to Section 1602 of the FGC, the CDFW regulates all diversions, obstructions, or changes to the natural flow or bed, channel, or bank of any river, stream, or lake that supports Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-4
fish or wildlife. A Notification of Lake or Streambed Alteration must be submitted to CDFW for “any activity that may substantially divert or obstruct the natural flow or substantially change the bed, channel, or bank of any river, stream, or lake.” The CDFW has jurisdiction over riparian habitats associated with watercourses and wetland habitats supported by a river, lake, or stream.

Jurisdictional waters are delineated by the outer edge of riparian vegetation (i.e., drip line) or at the top of the bank of streams or lakes, whichever is wider. CDFW jurisdiction does not extend to tidal areas or isolated resources. CDFW reviews the proposed actions and, if necessary, submits (to an applicant) a proposal that includes measures to protect affected fish and wildlife resources.

The final proposal that is mutually agreed upon by the CDFW and an applicant is the Lake or Streambed Alteration Agreement.

California Fish and Game Code Sections 3503, 3511, 3513, 3800, 4700, 5050, and 5515 In California, fish, wildlife, and native plant resources are protected and managed by the CDFW.

The CFGC and/or CDFW are responsible for issuing permits for the take or possession of protected species. The following sections of the CFGC address protected species: Section 3511 (birds), Section 4700 (mammals), Section 5050 (reptiles and amphibians), and Section 5515 (fish). In addition, the protection of birds of prey is provided for in Sections 3503, 3513, and 3800 of the FGC.

Porter-Cologne Water Quality Control Act
The Porter-Cologne Act (Water Code, Division 7) provides for statewide coordination of water quality regulations. The SWRCB was established as the statewide authority and nine separate RWQCBs were developed to oversee water quality on a day-to-day basis. The SWRCB is the primary agency responsible for protecting water quality in California. As discussed above, the RWQCBs regulate discharges to surface waters under the CWA. In addition, the RWQCBs are responsible for administering the Porter-Cologne Act.

Pursuant to the Porter-Cologne Act, the State is given authority to regulate waters of the state, which are defined as any surface water or groundwater, including saline waters. As such, any person proposing to discharge waste into a water body that could affect its water quality must first file a Report of Waste Discharge if section 404 of the CWA is not required for the activity. “Waste” is partially defined as any waste substance associated with human habitation, including fill material discharged into water bodies.

California Native Plant Protection Act
The NPPA was enacted in 1997 and allows the designation of plants as rare and endangered by the California Fish and Game Commission. The NPPA also prohibits the take of endangered or rare native plants, with some exceptions, including agricultural and nursery operations; emergencies; and after proper notification to CDFW for removal of vegetation in canals, roads, and other sites and changes in land use. There are 64 species, subspecies, and varieties of plants that are protected as rare under the NPPA.1
1 California Department of Fish and Wildlife (CDFW). 2026. California Laws Protecting Native Plants: California Native Plant Protection Act. Available at:
https://wildlife.ca.gov/Conservation/Plants/Laws#:~:text=The%20Native%20Plant%20Program%20coordinates,the%20significant%2 0impacts%20they%20identify. Accessed February 2026.

Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-5
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s biological resources. At the end of each policy is listed in parentheses a code beginning with the letter “I” followed by a number. This code refers to the pertinent implementing program. The relevant implementing programs are also included below.

Conservation Element
CON/BR-G-1 Conserve and enhance Bakersfield’s biological resources in a manner which facilitates orderly development and reflects the sensitivities and constraints of these resources.

CON/BR-G-2 To conserve and enhance habitat areas for designated “sensitive” animal and plant species.

CON/BR-P-1 Direct development away from “sensitive biological resource” areas, unless effective mitigation measures can be implemented (I-1, I-3, I-4).

CON/BR-P-2 Preserve areas of riparian vegetation and wildlife habitat within floodways along rivers and streams, in accordance with the Kern River Plan Element and channel maintenance program designed to maintain flood flow discharge capacity (I-4).

CON/BR-P-3 Discourage, where appropriate, the use of off-road vehicles to protect designated sensitive biological and natural resources (I-2).

CON/BR-P-4 Determine the feasibility of enhancing sensitive biological habitat and establishing additional wildlife habitat in the study area with State and/or Federal assistance (I-3).

CON/BR-P-5 Determine the locations and extent of suitable habitat areas required for the effective conservation management of designated “sensitive” plant and animal species (I-3).

City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the city in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic stability of agricultural, residential, commercial, industrial and other areas within the City, and to assure the orderly and beneficial development of such areas.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-6
Metropolitan Bakersfield Habitat Conservation Plan
The goal of the Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) was to acquire, preserve, and enhance native habitats which support endangered and sensitive species, while allowing urban development to proceed as set forth in the General Plan. The Plan Area of the MBHCP included both the City and County of Kern (County) jurisdictions. The MBHCP was required to meet the requirements of both the FESA and CESA as well as comply with State and federal environmental regulations set forth in NEPA and CEQA.2 As of January 1, 2023, the Project Site is currently not within any state or federal Habitat Conservation Plans. The MBHCP and associated Incidental Take Permit (ITP) expired on January 1, 2023. As such, the City no longer acts as a permittee for projects that were approved/permitted after Friday, December 30, 2022. Urban development permits issued after the 2023 expiration date are required to comply directly with the requests of USFWS and the CDFW.

Any project approved prior to January 1, 2023, was required to be under the MBHCP and associated ITP until the expiration date of June 1, 2023. To ensure take of covered species does not occur after the expiration date, fees were required to be paid no later than January 1, 2023, and all covered activities were required to be completed by the MBHCP expiration date of June 1, 2023.

4.4.2 Environmental Setting
The Environmental Setting for the Project’s biological resources is supported by the GBA prepared by HES and dated November 2025 (Appendix C).

Regional Setting
The City is located within a region of broad arid plains within the County. Due to the area’s low and infrequent rainfall and generally little topographic relief, the predominant vegetation and wildlife within the City have adapted to an arid climate. Grasslands and scrublands had historically covered the entire City. Localized depressions where rainwater collects often harbor unique plant life.

Existing Site Conditions
The Project Site consists primarily of non-vegetation and is entirely categorized as a disturbed ruderal area habitat type with paved sidewalks along the edges. The Project Site also consists of unvegetated roadways and some areas with little to no vegetation. If vegetation is present, the dominant species are downy chess (Bromus tectorum) and tumbleweed (Salsola tragus). Other plant species observed include red brome (Bromus rubens), California croton (Croton californicus), and silverleaf nightshade (Solanum elaeagnifolium).3 Additionally, the Project Site is not located within any designated federal critical habitat. 2 City of Bakersfield. 1994. Metropolitan Bakersfield Habitat Conservation Plan, S. Summary. Available at:
https://docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habitat%20Conservation%20Plan.pdf.

Accessed February 2026.
3 City of Bakersfield. 1994. Metropolitan Bakersfield Habitat Conservation Plan, S. Summary. Available at:
https://docs.bakersfieldcity.us/weblink/0/edoc/625001/Metropolitan%20Bakersfield%20Habitat%20Conservation%20Plan.pdf.

Accessed February 2026.

Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-7
Special-Status Species
Special-status species are those wildlife and plant species that warrant special consideration during the CEQA process. These include the following:
• Officially designated “threatened,” “endangered,” or “candidate” species federally listed by the USFWS and protected under the FESA;
• Officially designated “rare,” “threatened,” “endangered,” or “candidate” species state-listed by the CDFW and protected under the CESA. CDFW also maintains a list of “Fully Protected” species as well as CSSC that are also generally treated as special-status species under CEQA;
• Species considered rare, threatened, or endangered under the conditions of Section 15380 of the CEQA Guidelines, such as plant species identified on lists 1A, 1B, and 2 in the California Native Plant Society Inventory of Rare and Endangered Vascular Plants of California (CNPS Inventory), which may include species not found on either state or federal endangered species list; and
• Other species considered sensitive, such as birds protected under the MBTA.

The General Biological Assessment (GBA) includes the results of database searches for species that are listed or candidates for listing by USFWS, CDFW, and CNPS. The CNDDB was also queried. A total of 18 sensitive species of plants and 29 sensitive species of animals have the potential to occur on or within the vicinity of the Project Site, for a total of 47 sensitive species.

These species are identified in Appendix B of the GBA.

Of the 47 sensitive species identified in the database searches, 12 plant species and 10 wildlife species are listed as Candidate, Rare, Threatened, or Endangered under the state and federal Endangered Species laws or directed to be evaluated under other state, county, or municipal regulations, which are further discussed below. Additionally, all habitats utilized by these species were evaluated during the November 2025 field survey of the Project Site and the GBA contains a determination for the presence or probability of presence of these species.

Additionally, as described in Appendix A of the GBA, there were 10 other species without special-status observed during the November 2025 field visit.

Special-Status Plants
A total of 12 plants species are listed as State and/or federal Threatened, Endangered, Candidate, or 1B.1 listed plants on the CNPS Rare Plant Inventory with the potential to occur on the Project Site or in the Project vicinity. Plants with a California Rare Plant Rank (CRPR) of 1B.1 are rare, threatened, or endangered in California and elsewhere, and are critically threatened in California (over 80% of occurrences are threatened or high threat). These plants are generally endemic to California and are eligible for state listing.4 Table 4.4-1, Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species, includes the plant common and scientific names, its status, whether a habitat for the species is present on the Project Site, and whether the species itself is present on the Project Site. As shown below, the Project Site does not include suitable 4 California Native Plant Society. 2026. California Rare Plant Ranks webpage. Available at: https://www.cnps.org/rare- plants/california-rare-plant-ranks#:~:text=Plants%20with%20a%20California%20Rare%20Plant%20Rank%20of%201B%20are,) %20and/or%20%C2%A715380. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-8
habitat for any of the special-status plant species identified and none were present on the Project Site.

Table 4.4-1 – Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species Common Name Scientific Name Status
Habitat for
specifies on
Project Site?
Species
present on
Project Site?
1 Horn’s milk-vetch Astragalus hornii
var. hornii)
1B.1 in the CNPS
inventory
No No
2 Bakersfield
smallscale
Atriplex tularensis Endangered (State); 1A in
the CNPS inventory
No No
3 Californiajewelflower Caulanthus
californicus
Endangered (federal);
state Endangered (State);
1B.1 in the CNPS
inventory
No No
4 Hispid salty bird's-beakChloropyron molle
ssp. hispidum
1B.1 in the CNPS
inventory
No No
5 Kern mallow Eremalche parryi
ssp. kernensis
Endangered (State); 1B.2
in the CNPS inventory
No No
6 Tejon poppy Eschscholzia
lemmonii ssp.
kernensis
1B.1 in the CNPS
inventory
No No
7 Comanche point layia Layia leucopappa 1B.1 in the CNPS inventory
No No
8 San Joaquin
woollythreads
Monolopia
congdonii
Endangered (federal);
1B.2 in the CNPS
inventory
No No
9 Piute Mountains
navarretia
Navarretia
setiloba
1B.1 in the CNPS
inventory
No No
10 Bakersfield cactus Opuntia basilaris
var. treleasei
Endangered (federal);
Endangered (State); 1B.1
in the CNPS inventory
No No
11 Oil neststraw Stylocline
citroleum
1B.1 in the CNPS
inventory
No No
12 Mason's neststraw Stylocline masonii 1B.1 in the CNPS inventory
No No
Source: Hernandez Environmental Services, 2025.

Special-Status Wildlife
A total of ten wildlife species is listed as State and/or federal Threatened, Endangered, or Candidate species have a potential to occur on the Project site or within the Project vicinity are identified below in Table 4.4-2, Threatened, Endangered, or Candidate Wildlife Species. All sensitive species within a five-mile radius of Project Site were reviewed and a complete list of those species are discussed in Appendix B of the GBA. However, only those identified to occur within the Project Area which included a 500-foot buffer around the Project Site was evaluated in the GBA and are included in Table 4.4-2. The buffer around surveyed included accessible areas (areas that were not fenced off by security fencing) that abut the Project Site to the south and west. Notably, the American badger, Bakersfield leg-less lizard, and the westerns spade foot, and burrowing owl are not identified to occur within the Project Area.

Table includes the wildlife common and scientific names, its status, whether a habitat for the species is present on the Project Site, and whether the species itself is present on the Project Site. As shown below, the Project Site does not include suitable habitat for any of the special-status plant species identified and none were present on the Project Site.

Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-9
Table 4.4-2 – Threatened, Endangered, or Candidate Wildlife Species Common Name Scientific Name Status
Habitat for
specifies on
Project Site?
Species
present on
Project Site?
1 Tricolored blackbird Agelaius tricolor Candidate
Endangered
(State); CSSC
No No
2 Nelson's (San
Joaquin) antelope
squirrel
Ammospermophilus
nelsoni
Threatened (State) No No
3 Crotch bumble bee Bombus crotchii Candidate
Endangered (State)
No No
4 Swainson’s hawk Buteo swainsoni Threatened (State) No No 5 Monarch - California
overwintering
population
Danaus plexippus
pop.1
Candidate Species
(federal)
No No
6 Valley elderberry
longhorn beetle
Desmocerus
californicus dimorphus
Threatened (State) No No
7 Tipton kangaroo rat Dipodomys nitratoides
nitratoides
Endangered
(federal);
Endangered (State)
No No
8 Blunt-nosed leopard
lizard
Gambelia sila Endangered
(federal);
Endangered (State)
No No
9 Buena Vista Lake
ornate shrew
Sorex ornatus relictus Threatened
(federal); CSSC
No No
10 San Joaquin kit fox Vulpes macrotis mutica Endangered (federal);
Threatened (State)
No No
Source: Hernandez Environmental Services, 2025.

Nesting Birds
As discussed above, migratory non-game native bird species are protected under the federal MBTA. Additionally, Sections 3503, 3503.5, and 3513 of the California Fish and Game Code. The Project Site has shrubs that can be used by nesting songbirds during the nesting bird season of February 1 to September 15.

Wildlife Movement Corridors
Wildlife movement corridors link together areas of suitable habitat that are otherwise separated by rugged terrain, changes in vegetation, or human disturbances. The Project Site was evaluated for its function as a wildlife corridor that species would use to move between wildlife habitat zones.

Usually, mountain canyons or riparian corridors are used by wildlife as corridors. The Project Site is relatively flat and does not contain mountain canyons or riparian corridors nearby. Furthermore, the site is blocked off on the east end by railroad tracks and a residential area to the west. No wildlife movement corridors were found to be present on the Project Site.

Jurisdictional Waters and Wetlands
No federal or jurisdictional streams occur on the Project Site. Based on a review of the Project Site’s aerial images and as observed during the field visit, an underground stormwater feature was identified near the east border of the Project Site. This stormwater feature carries water that flows from four culverts to the southeast of the Project Site from south to north. However, This feature does not qualify as state or federal jurisdictional waters.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-10

4.4.3 Impact Analysis
Methodology
As described above, the analysis in this section in based, in part, on a GBA prepared for the Project (Appendix C). The purpose of the GBA is to document the presence or absence of sensitive resources that may be present on the Project Site, to document existing habitats, and generally address biological questions that may be needed for Project approval. The GBA includes results obtained from the November 13, 2025, field survey and as well as recommendations that may be needed to mitigate potential biological impacts from project activities. The field survey included the entire Project Site which was walked in linear transects approximately 50 feet apart for 100 percent coverage of the Project Site.

Literature Review
The CBA included a literature review and reviewed aerial photographs and topographic maps of the Project Site and surrounding areas. The following United State Geological Survey (USGS) quads were used to query the CNDDB: Oildale, Rosedale, Famoso, North of Oildale, Knob Hill, Oil Center, Lamont, Gosford, and Stevens. The USFWS County Endangered Species Lists, and CNPS's rare plant lists were reviewed to obtain species information for the Project Site and its surrounding area. The potential for these species to be affected by the Project was evaluated qualitatively.

Field Survey
On November 13, 2025, HES conducted a field survey of the Project Site. The purpose of the field survey was to document the existing habitat conditions, obtain plant and animal species information, view the surrounding uses, assess the potential for state and federal waters, assess the potential for wildlife movement corridors, and assess for the presence of critical habitat constituent elements.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance5to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S.

Fish and Wildlife Service.
• Have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service. • Have a substantial adverse effect on state of federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means.
5 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-11
• Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, of impede the use of native wildlife nursery sites.
• Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance.
• Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan.

Project Impacts
Threshold BIO-1: Would the project have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service?
Impact Analysis
The Project site consists of approximately 46.16 acres of land characterized as disturbed ruderal land. Table 4.4-1, Threatened, Endangered, Candidate, or 1B.1 Ranked Plant Species, and Table

4.4-2, Threatened, Endangered, or Candidate Wildlife Species, identify species that have potential to occur on the Project Site or in the Project vicinity.

The CBA completed for the Project confirmed that no special-status species under CEQA or designated critical habitat were found on the Project site (Appendix C). The Project site is highly disturbed and located in a highly urbanized area. It does not provide suitable habitat to support these species. Accordingly, the Project would not have a substantial adverse effect on any species identified as a candidate, sensitive, or special-status species in local and regional plans, policies, or regulations, or by the CDFW or USFWS.

Additionally, as discussed above, migratory non-game native bird species are protected under the MBTA and the California Fish and Game Code prohibits take of all birds and their active nests.

The Western burrowing owl (BUOW) was approved by the California Fish and Game Commission as a candidate species for listing under the CESA) in 2024, and therefore receives the same legal protection afforded to state listed threatened and endangered species. The Project site does not contain suitable habitat for the BUOW and it was not present on the Project site during the field survey. However, because BUOWs may become established on disturbed sites prior to construction, a pre-construction BUOW survey is recommended within 30 days prior to the start of ground-disturbing activities, as specified further in Mitigation Measure (MM) BIO-1. If BUOWs are detected, appropriate avoidance and minimization measures, including no disturbance buffers and monitoring, shall be implemented in consultation with CDFW as specified in MM BIO-2.

Additionally, the Project Site has shrubs that could be used by nesting songbirds during the nesting bird season. Therefore, the potential for the Project to impact MBTA protected birds exists.

If vegetation removal and other ground disturbance activities can be conducted outside of the recognized nesting bird season, impacts to nesting birds are not expected. However, if work cannot be avoided during the nesting bird season, the Project would implement MM BIO-3, which require pre-construction nesting surveys prior to initiation of Project, should ground disturbance, vegetation clearing, or other construction activities that would otherwise disturb nesting activity Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-12
(for instance, mobilization of heavy equipment). With the implementation of MM BIO-1 through MM BIO-3, impacts to nesting birds would be avoided and impacts would be less than significant.

Mitigation Measures
The following mitigation measure is applicable to the Project and would be implemented to reduce impacts to a less than significant level.

MM BIO-1 Burrowing Owl (BUOW) Pre-Construction Surveys. Prior to the commencement of ground-disturbing or vegetation-clearing activities, the project applicant/developer shall retain a qualified biologist to conduct pre-construction surveys for BUOW (Athene cunicularia) in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Depending on the time elapsed between the focused surveys conducted in support of the analysis conducted as a part of the biological resource assessment and the start of construction, additional focused surveys may be required during the survey season immediately preceding construction. As specified in the 2012 Staff Report, one 30-day pre-construction survey is recommended; however, multiple surveys may be necessary prior to construction to determine presence or absence, and burrowing owls may colonize a site following previous negative survey results. Therefore, the project site shall be monitored 30 days prior to ground disturbance to detect any occupancy prior to construction activities.

MM BIO-2 Burrowing Owl (BUOW) Avoidance Buffer. If western burrowing owls or occupied or unoccupied burrows are detected during pre-construction surveys or at any time during construction, no-disturbance buffers shall be established by the qualified biologist in accordance with the California Department of Fish and Wildlife (CDFW) 2012 Staff Report on Burrowing Owl Mitigation (CDFG 2012). Buffer distances (50 – 500 meters) shall be based on the season (breeding or non-breeding), level of owl activity, and the type and intensity of proposed construction activities. These buffers shall remain in place until the qualified biologist determines that the burrow is no longer occupied, the owls have fledged and are no longer dependent on the burrow, or CDFW-approved passive relocation procedures have been completed. The qualified biologist shall monitor compliance with the buffer requirements and shall have the authority to halt work if project activities are causing disturbance to western burrowing owls.

MM BIO-3 Nesting Birds. If ground disturbing and vegetation clearing activities cannot be avoided during the nesting bird season (February 1 through September 15), a qualified biologist shall conduct a pre-construction nesting bird survey within all areas of breeding and nesting habitat within and adjacent to the Project Site no more than 10 days prior to initiation of Project activities that would remove vegetation or otherwise disturb nesting activity (for instance, mobilization of heavy equipment) of all areas of the Project Site that could be directly or indirectly impacted by construction activity.

Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-13
If nesting birds are encountered, the qualified biologist shall establish a baseline for the behavior of any identified nests and shall continuously monitor the nests to detect changes in behavior. Should behavioral changes occur, the Project proponent shall halt construction work causing that change and consult with the California Department of Fish and Wildlife for additional avoidance and minimization measure.

If continuous monitoring of the identified nests by a qualified biologist is not feasible, a qualified biologist shall establish an avoidance buffer zone around the nest, which shall be determined by the qualified biologist according to species involved. At a minimum, a no-disturbance buffer of 250 feet shall be established around active nests of non-listed bird species and a 500-foot no-disturbance buffer shall be established around active nests of non-listed raptors. No activities that would adversely affect the nest shall occur within the buffer zone until the qualified biologist has determined the nest is no longer active, breading season is over, or the young are no longer dependent on the nest.

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Threshold BIO-2: Would the project have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations or by the California Department of Fish and Wildlife or U.S. Fish and Wildlife Service? Impact Analysis
The Project site is highly disturbed. Based on the literature review, there are no wetlands or riparian habitats found on or near the Project Site. The November 2025 survey completed for the Project as part of the CBA confirmed that there are no wetlands or riparian habitats found on the Project Site (Appendix C). As discussed above, aerial images indicated and the November 2025 field survey confirmed that an underground stormwater feature exists near the east border of the Project Site. The feature carries water that flows from four culverts to the southeast of the Project Site from south to north. However, the CBA determined that this stormwater feature exists underground and is not CDFW, USACE, or RWQCB jurisdictional waters. Therefore, the Project no impacts to jurisdictional waters would occur from Project implementation Accordingly, jurisdictional waters would not be impacted by Project implement and no impact to any riparian habitat or other sensitive natural community identified would occur.

Mitigation Measures
None required.

Level of Significance
No impact.

Threshold BIO-3: Would the project have a substantial adverse effect on state or federally protected wetlands (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means?
Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-14
Impact Analysis
The Project would not impact riparian areas, vernal pools or other jurisdictional aquatic resources because these features do not occur on or near the Project Site. As noted above, an underground drainage feature was identified underneath the Project Site, but this is not considered a protected wetland. Therefore, no impacts would occur.

Mitigation Measures
None required.

Level of Significance
No impact.

Threshold BIO-4: Would the project interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites?
Impact Analysis
No wildlife movement corridors were found to be present on the Project Site. The Project Site is relatively flat and does not contain mountain canyons or riparian corridors nearby which are typically used by wildlife for movement. There are no water features on the Project site that would support the movement or native or migratory fish. Furthermore, Project Site is in urbanized environment and is blocked off on the east end by railroad tracks and a residential area to the west. Accordingly, the Project Site is not part of a wildlife movement corridor, nor does it serve as a wildlife nursery site, and there would be no impact.

Mitigation Measures
None required.

Level of Significance
No impact.

Threshold BIO-5: Would the project conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance?
Impact Analysis
The Project Site is highly disturbed and does not contain any trees that would be required to be removed as part of Project implementation. As such, tree protection ordinances or policies would not apply to the Project. However, Project Site has shrubs that can be used by nesting songbirds during the nesting bird season of February 1 to September 15 that would be removed by the Project. However, the Project would implement new landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that would provide new bird habitat. The parking lot area would include 443 trees, and the Project would include 122 street trees (79 trees provided on Coffee Road and 43 on Rosedale Highway) plus 534 trees within the Project Site for a total of 656 trees. Therefore, the Project would provide substantial amount of new trees compared to existing conditions.

Riverview Market Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-15
Additionally, in reviewing the applicable General Plan goals, policies, and implementation programs (see Section 4.4.1, Regulatory Setting), the Project would be consistent with the General Plan by avoiding impact to sensitive biological communities and species by creating a buffer around nesting birds protected by the MBTA and surveying and buffering the BUOW through the implementation of MM BIO-1 through MM BIO-3. Furthermore, as discussed further under Impact BIO-6, the Project would not conflict with the MBHCP since it has expired.

Accordingly, the Project would not conflict with any local policies or ordinances protecting biological resources, and impacts would be less than significant.

Mitigation Measures
Implement MM BIO-1.

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Threshold BIO-6: Would the project conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? Impact Analysis
The Project Site is not located within the boundaries of an approved and active State or federal Habitat Conservation Plan. As discussed under Section 4.4.1, Regulatory Setting, the MBHCP and associated ITP expired on January 1, 2023. As such, the Project must comply with direct requests from USFWS or CDFW. During the NOP comment period for the Project, neither USFWS nor CDFW have made direct requests to the Project regarding habitat conservation. Accordingly, there would be no impact.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects within an approximately 1.5-mile radius of the Project Site that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the Project, in combination with the identified cumulative projects, would result in significant effects to biological resources. Because biological resources are closely tied to a physical site, for purposes of this analysis, the geographic scope would be the Project Area established by GBA, including the Project Site, and the 1.5-mile radius of the Project site where the identified cumulative projects are situated.

As discussed in Section 4.4.3, Impact Analysis, the Project would have no impact on State or federally protected wetlands, it would have no impact on the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors Riverview Marketplace Commercial Project
Environmental Impact Report 4.4 Biological Resources
City of Bakersfield – SCH No. 2025101507 4.4-16
or impede the use of native wildlife nursery sites. In addition, as the Project is not located within the boundaries of an adopted Habitat Conservation Plan or other approved local, regional, or State habitat conservation plan, there would be no impact to these plans. Furthermore, there are no wetlands or riparian habitats found on or near the Project site. No existing trees would be removed, so no tree preservation ordinance is applicable to the Project. Moreover, the Project would not conflict with any local policies or ordinances protecting biological resources, and impacts would be less than significant.

Federal and State-listed species have been identified as having the potential to occur in the Project area; however, due to the highly disturbed nature of the Project Site, these resources are unlikely to occur because no suitable habitat for any of the species identified is located on the Project Site. Additionally, as determined by the November 2025 field survey completed of the Project site, all identified species are notably absent. However, as discussed above, the Project has the potential to impact nesting birds protected under the MBTA and the BUOW. As such, the Project would implement MM BIO-1 through MM BIO-3, which requires a qualified biologist to survey the Project Site prior to construction and create a buffer during construction should nesting birds or the BUOW be suspected to be on or adjacent to the Project Site.

Construction
Similar to the Project, the cumulative projects are located in a disturbed, urbanized area with surrounding development. As with the Project, construction of the cumulative projects would be required to be consistent with applicable federal, State, and local regulations concerning biological resources. Furthermore, it is anticipated that in the event of any potential construction impacts associated with the cumulative projects, appropriate mitigation measures would be identified to reduce those impacts to less than significant. Accordingly, the less than significant impacts, with the implementation of MM BIO-1 through MM BIO-3, associated with the Project are not anticipated to combine with any impacts associated with the cumulative projects to substantially affect biological resources. Cumulative impacts associated with construction would be less than significant.

Operations
Similarly, due to the disturbed nature of the area, operations are not expected to significantly impact biological resources. Operational conditions for the Project and cumulative projects are expected to be not dissimilar from existing conditions. Accordingly, cumulative impacts to biological resources associated with the Project and cumulative projects would be less than significant.

Mitigation Measures
Implement MM BIO-1 through MM BIO-3.

Level of Significance After Mitigation
Cumulative impacts related to cultural resources would be less than significant with MM BIO-1 through MM BIO-3 incorporated.

City of Bakersfield – SCH No. 2025101507 4.5-1

4.5 Cultural Resources
This section discusses potential impacts associated with the proposed Riverview Marketplace Commercial Project (Project) that may result in adverse impacts to cultural resources, including historical and archeological resources and human remains. This section also discusses the Project’s consistency with federal, State, and local plans and regulations that protect cultural resources. This analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether a Project would result into significant impacts to cultural resources. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan), the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance), and a Cultural Resources Assessment (CRA), dated February 2025, for the Project by BCR Consulting (BCR) and included in Appendix D, Cultural Resources Assessment, to this Draft EIR.

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) related to cultural resources.

Comments were received related to Tribal Cultural Resources, and as such, are discussed in Section 4.19, Tribal Cultural Resources, of this Draft EIR.

4.5.1 Regulatory Setting
Federal
National Historic Preservation Act and National Register of Historic Places The National Historic Preservation Act of 1966 (NHPA)(16 U.S.C. ch. 1A, subch. II; § 470), established the National Register of Historic Places (National Register) as “an authoritative guide to be used by federal, state, and local governments, private groups and citizens to identify the Nation’s historic resources and to indicate what properties should be considered for protection from destruction or impairment.”1 The National Register recognizes a broad range of cultural resources that are significant at the national, State, and local levels and can include districts, buildings, structures, objects, prehistoric archaeological sites, historic-period archaeological sites, traditional cultural properties, and cultural landscapes. A resource that is listed in or eligible for listing in the National Register is considered “historic property” under Section 106 of the NHPA.

Section 106 of the NHPA also requires federal agencies to consult with State Historic Preservation Officers (SHPOs) and Tribal Historic Preservation Officers (THPOs) if their projects have the potential to affect a historic resource eligible for or listed on the National Register. The National Register identifies more than 98,000 properties as possessing exceptional national significance in American history and culture.2
Criteria
To be eligible for listing in the National Register, a resource must be at least 50 years of age, unless it is of exceptional importance as defined in Title 36 of the Code of Federal Regulations (CFR), part 60, section 60.4(g). The resource must also be significant in American history, architecture, archaeology, engineering, or culture. The following four criteria for evaluation of 1 36 Code of Federal Regulations (CFR) § 60.
2 United States Department of the Interior (DOI), National Park Service (NPS), What is the National Register of Historic Places? Available at: https://www.nps.gov/subjects/nationalregister/what-is-the-national-register.htm. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-2
eligibility for listing have been established to determine the significance of a resource. A property is eligible for listing if:

A. It is associated with events that have made a significant contribution to the broad patterns of our history;
B. It is associated with the lives of persons significant in our past; C. It embodies the distinctive characteristics of a type, period, or method of construction or that represent the work of a master, or that possess high artistic values, or that represent a significant and distinguishable entity whose components may lack individual distinction; or
D. It has yielded, or may be likely to yield, information important in prehistory or history.3 Context
To be eligible for listing in the National Register, a property must be significant within a historic context. National Register Bulletin #15 states that the significance of a historic property can be judged only when it is evaluated within its historic context. Historic contexts are “those patterns, themes, or trends in history by which a specific...property or site is understood and its meaning... is made clear.”4 A property must represent an important aspect of the area’s history or prehistory and possess the requisite integrity to qualify for the National Register.

Integrity
In addition to meeting one or more of the criteria of significance, a property must have integrity, which is defined as “the ability of a property to convey its significance.”5 The National Register recognizes seven qualities that, in various combinations, define integrity. The seven factors that define integrity are:
• Location
• Design
• Setting
• Materials
• Workmanship
• Feeling
• Association
To retain historic integrity a property must possess several, and usually most, of these seven aspects. Thus, the retention of the specific aspects of integrity is paramount for a property to convey its significance. In general, the National Register has a higher integrity threshold than State or local registers.
3 U.S. DOI, NPS, National Register Bulletin #15: How to Apply the National Register Criteria for Evaluation, 1997, page 8. Available at: https://www.nps.gov/subjects/nationalregister/upload/NRB-15_web508.pdf. Accessed February 2026. 4 Id., at pp. 7 and 8.
5 Id., at p. 44.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-3
Criteria Considerations
Certain types of properties, including religious properties, moved properties, birthplaces or graves, cemeteries, reconstructed properties, commemorative properties, and properties that have achieved significance within the past 50 years are not considered eligible for the National Register unless they meet one of the seven categories of Criteria Considerations A through G, in addition to meeting at least one of the four significance criteria and possess integrity, as defined above.Criteria Consideration G is intended to prevent the listing of properties for which insufficient time may have passed to allow the proper evaluation of their historical importance. The full list of Criteria Considerations is provided below:

A. A religious property deriving primary significance from architectural or artistic distinction or historical importance; or
B. A building or structure removed from its original location but which is significant primarily for architectural value, or which is the surviving structure most importantly associated with a historic person or event; or
C. A birthplace or grave of a historical figure of outstanding importance, if there is no other appropriate site or building directly associated with his or her productive life; or D. A cemetery which derives its primary significance from graves of persons of transcendent importance, from age, from distinctive design features, or from association with historic events; or
E. A reconstructed building when accurately executed in a suitable environment and presented in a dignified manner as part of a restoration master plan, and when no other building or structure with the same association has survived; or F. A property primarily commemorative in intent if design, age, tradition, or symbolic value has invested it with its own historical significance; or G. A property achieving significance within the past 50 years if it is of exceptional importance.

Secretary of the Interior’s Standards
The National Park Service (NPS) issued the Secretary of the Interior’s Standards for the Treatment of Historic Properties (Secretary’s Standards) with accompanying guidelines for four types of treatments for historic resources: Preservation, Rehabilitation, Restoration, and Reconstruction. The most applicable guidelines should be used when evaluating a project for compliance with the Secretary’s Standards. Although none of the four treatments, as a whole, apply specifically to new construction in the vicinity of historic resources, Standards #9 and #10 of the Secretary’s Standards provides relevant guidance for such projects. The Standards for Rehabilitation are as follows:

1. A property will be used as it was historically or be given a new use that requires minimal change to its distinctive materials, features, spaces and spatial relationships.

2. The historic character of a property will be retained and preserved. The removal of distinctive materials or alteration of features, spaces, and spatial relationships that characterize a property will be avoided.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-4

3. Each property will be recognized as a physical record of its time, place and use. Changes that create a false sense of historical development, such as adding conjectural features or elements from other historic properties, will not be undertaken.

4. Changes to a property that have acquired significance in their own right will be retained and preserved.

5. Distinctive materials, features, finishes and construction techniques or examples of craftsmanship that characterize a property will be preserved.

6. Deteriorated historic features will be repaired rather than replaced. Where the severity of deterioration requires replacement of a distinctive feature, the new feature shall match the old in design, color, texture, and where possible, materials. Replacement of missing features will be substantiated by documentary and physical evidence.

7. Chemical or physical treatments, if appropriate, will be undertaken using the gentlest means possible. Treatments that cause damage to historic materials will not be used.

8. Archeological resources will be protected and preserved in place. If such resources must be disturbed, mitigation measures will be undertaken.

9. New additions, exterior alterations, or related new construction will not destroy historic materials, features, and spatial relationships that characterize the property. The new work shall be differentiated from the old and will be compatible with the historic materials, features, size, scale and proportion, and massing to protect the integrity of the property and its environment.

10. New additions and adjacent or related new construction will be undertaken in such a manner that if removed in the future, the essential form and integrity of the historic property and its environment would be unimpaired.

It is important to note that the Secretary’s Standards are not intended to be prescriptive but, instead, provide general guidance. They are intended to be flexible and adaptable to specific project conditions to balance continuity and change, while retaining materials and features to the maximum extent feasible. Their interpretation requires exercising professional judgment and balancing the various opportunities and constraints of any given project. Not every Standard necessarily applies to every aspect of a project, and it is not necessary for a project to comply with every Standard to achieve compliance.

Native American Graves Protection and Repatriation Act
The Native American Graves Protection and Repatriation Act (NAGPRA)( 25 U.S.C. ch. 32 § 3001 et seq.) provides for the protection of Native American human remains and funerary and cultural objects and requires federal agencies to return Native American cultural items to the appropriate Federally recognized Indian tribes or Native Hawaiian groups with which they are associated.6 Archaeological Resources Protection Act
The Archaeological Resources Protection Act of 1979 (ARPA) governs the excavation, removal, and disposition of archaeological sites and collections on federal and Native American lands. The ARPA defines archaeological resources as any material remains of human life or activities that are at least 100 years of age, and which are of archeological interest. The ARPA makes it illegal 6 United States Department of the Interior, National Park Service, Native American Graves Protection And Repatriation Act, 1990.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-5
for anyone to excavate, remove, sell, purchase, exchange, or transport an archaeological resource from federal or Native American lands without a proper permit.7 Archeological and Historic Preservation Act of 1974
The Archeological and Historic Preservation Act of 1974 (AHPA)(54 U.S.C. §§ 312501-312508) requires agencies to report any perceived project impacts on archaeological, historical, and scientific data and requires them to recover such data or assist the Secretary of the Interior in recovering the data.

State
California Environmental Quality Act
The California Environmental Quality Act (CEQA)(Public Resources Code [PRC] § 21000 et seq.) is the principal statute governing environmental review of projects occurring in the State. CEQA requires lead agencies to determine if a proposed project would have a significant effect on the environment, including significant effects on historical or unique archaeological resources. Under CEQA Section 21084.1, a project that may cause a substantial adverse change in the significance of a historical resource is a project that may have a significant effect on the environment.

Historical Resources
CEQA Guidelines Section 15064.5 defines a “historic resource” as including the following:

1. A resource listed in, or determined to be eligible by the State Historical Resources Commission, for listing in the California Register of Historical Resources (California Register) (PRC § 5024.1, Title 14 CCR, Section 4850 et seq.).

2. A resource included in a local register of historical resources, as defined in section 5020.1(k) of the PRC or identified as significant in an historical resource survey meeting the requirements section 5024.1(g) of the PRC, shall be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant.

3. Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be an historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the California Register (PRC § 5024.1, Title 14 CCR, Section 4852) including the following:
(A) Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage; (B) Is associated with the lives of persons important in our past; 7 United States Department of the Interior, National Park Service, Technical Brief # 20: Archeological Damage Assessment: Legal Basis and Methods, 2007.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-6
(C) Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or
(D) Has yielded, or may be likely to yield, information important in prehistory or history.

The significance of a historical resource is impaired when a project demolishes or materially alters in an adverse manner those physical characteristics of a historical resource that convey its historical significance and that justify its eligibility for the California Register. If an impact on a historical or archaeological resource is significant, CEQA requires feasible measures to minimize the impact (State CEQA Guidelines § 15126.4 (a)(1)). Mitigation of significant impacts must lessen or eliminate the physical impact that the project will have on the resource.

Archaeological Resource
If a lead agency determines that an archaeological site is a historical resource, the provisions of PRC Section 21084.1 and CEQA Guidelines Section 15064.5 apply. If an archaeological site does not meet the criteria for a historical resource contained in the CEQA Guidelines, then the site may be treated in accordance with the provisions of PRC Section 21083 if it meets the criteria of a unique archaeological resource. As defined in PRC Section 21083.2, a “unique archaeological resource” is an archaeological artifact, object, or site, about which it can be clearly demonstrated that without merely adding to the current body of knowledge, there is a high probability that it meets any of the following criteria:
• Contains information needed to answer important scientific research questions and there is a demonstrable public interest in that information;
• Has a special and particular quality such as being the oldest of its type or the best available example of its type; or
• Is directly associated with a scientifically recognized important prehistoric or historic event or person.

If an archaeological site meets the criteria for a unique archaeological resource as defined in PRC Section 21083.2, then the site is to be treated in accordance with the provisions of PRC Section 21083.2, which state that if the lead agency determines that a project would have a significant effect on unique archaeological resources, the lead agency may require reasonable efforts be made to permit any or all of these resources to be preserved in place.8If preservation in place is not feasible, mitigation measures shall be required. The CEQA Guidelines note that if an archaeological resource is neither a unique archaeological nor a historical resource, the effects of the project on those resources shall not be considered a significant effect on the environment.9 A significant effect under CEQA would occur if a project results in a substantial adverse change in the significance of a historical resource as defined in CEQA Guidelines Section 15064.5(a).

Substantial adverse change is defined as “physical demolition, destruction, relocation, or alteration of the resource or its immediate surroundings such that the significance of a historical resource would be materially impaired.”10 According to CEQA Guidelines Section 15064.5(b)(2), 8 California Public Resources Code Section 21083.1(a).
9 State CEQA Statute and Guidelines, Section 15064.5(c)(4). 10 State CEQA Guidelines, Section 15064.5(b)(1).

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-7
the significance of a historical resource is materially impaired when a project demolishes or materially alters in an adverse manner those physical characteristics that:

A. Convey its historical significance and that justify its inclusion in, or eligibility for, inclusion in the California Register; or
B. Account for its inclusion in a local register of historical resources pursuant to PRC Section 5020.1(k) or its identification in a historical resources survey meeting the requirements of PRC Section 5024.1(g) Code, unless the public agency reviewing the effects of the project establishes by a preponderance of evidence that the resource is not historically or culturally significant; or
C. Convey its historical significance and that justify its eligibility for inclusion in the California Register as determined by a Lead Agency for purposes of CEQA.

In general, a project that complies with the Secretary’s Standards is considered to have impacts that are less than significant.11
California Register of Historical Resources
The California Register (PRC § 5024.1) is “an authoritative listing and guide to be used by State and local agencies, private groups, and citizens in identifying the existing historical resources of the State and to indicate which resources deserve to be protected, to the extent prudent and feasible, from substantial adverse change.”12 The California Register was established in 1993, and its regulations became effective on January 1, 1998. The California Register is administered by the California Office of Historic Preservation (OHP). The criteria for eligibility for the California Register are based upon National Register criteria.13 Certain resources are determined to be automatically included in the California Register, including California properties formally determined eligible for, or listed in the National Register. To be eligible for the California Register, a prehistoric or historic-period property must be significant at the local, State, and/or federal level under one or more of the following four criteria:

1. Associated with events that have made a significant contribution to the broad patterns of local or regional history or the cultural heritage of California or the United States.

2. Associated with the lives of persons important to local, California, or national history;

3. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or

4. Has yielded, or may be likely to yield, information important in prehistory or history of the local area, California or the nation.

A resource eligible for the California Register must meet one of the criteria of significance described above and retain enough of its historic character or appearance (integrity) to be recognizable as a historical resource and to convey the reason for its significance. This is defined as the ability for the resource to convey its significance through seven aspects: location, setting, design, materials, workmanship, feeling, and association. 11 State CEQA Guidelines, 15064.5(b)(3).
12 California Public Resources Code, Section 5024.1[a]. 13 California Public Resources Code, Section 5024.1[b].

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-8
In addition to meeting one or more of the above criteria, the California Register requires that sufficient time has passed since a resource’s period of significance to “obtain a scholarly perspective on the events or individuals associated with the resources.” (CCR 4852 [d][2]). Fifty years is normally considered sufficient time for a potential historical resource, and in order that the evaluation remain valid for a minimum of five years after the date of this report, all resources older than 45 years (i.e. resources from the “historic-period”) will be evaluated for California Register listing eligibility, or CEQA significance.

It is possible that a historic resource may not retain sufficient integrity to meet the criteria for listing in the National Register, but it may still be eligible for listing in the California Register. Additionally, the California Register consists of resources that are listed automatically and those that must be nominated through an application and public hearing process. The California Register automatically includes the following:
• California properties listed on the National Register and those formally determined eligible for the National Register;
• California Registered Historical Landmarks from No. 770 onward; and, • Those California Points of Historical Interest that have been evaluated by the State Office of Historic Preservation (OHP) and have been recommended to the State Historical Resources Commission for inclusion on the California Register.

Other resources that may be nominated to the California Register include:
• Historical resources with a significance rating of Category 3 through 5 (those properties identified as eligible for listing in the National Register, the California Register, and/or a local jurisdiction register);
• Individual historical resources;
• Historic districts; and,
• Historical resources designated or listed as local landmarks, or designated under any local ordinance, such as an historic preservation overlay zone.

CEQA Guidelines Section 15064.5 Appendix G includes significance criteria relative to archaeological and historical resources. These have been utilized as thresholds of significance here, and a project would have a significant environmental impact if it would:
a) Cause a substantial adverse change in the significance of a historical resource as defined in section 10564.5;
b) Cause a substantial adverse change in the significance of an archaeological resource pursuant to Section 10564.5; or
c) Disturb any human remains, including those interred outside of formal cemeteries.

California Health and Safety Code
California Health and Safety Code Sections 7050.5, 7051, and 7054 address the illegality of interference with human burial remains (except as allowed under applicable sections of the PRC), and the disposition of Native American burials in archaeological sites. These regulations protect such remains from disturbance, vandalism, or inadvertent destruction, and establish procedures to be implemented if Native American skeletal remains are discovered during construction of a Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-9
project, including treatment of the remains prior to, during, and after evaluation, and reburial procedures.

California Public Resources Code
PRC Section 5097.98, as amended by Assembly Bill 2641, provides procedures in the event human remains of Native American origin are discovered during project implementation. Section 5097.98 requires that no further disturbances occur in the immediate vicinity of the discovery, that the discovery is adequately protected according to generally accepted cultural and archaeological standards, and that further activities consider the possibility of multiple burials. Section 5097.98 further requires the Native American Heritage Commission (NAHC), upon notification by a County Coroner, designate and notify a Most Likely Descendant (MLD) regarding the discovery of Native American human remains. Once the MLD has been granted access to the site by the landowner and inspected the discovery, the MLD then has 48 hours to provide recommendations to the landowner for the treatment of the human remains and any associated grave goods. In the event that no descendant is identified, or the descendant fails to make a recommendation for disposition, or if the landowner rejects the recommendation of the descendant, the landowner may, with appropriate dignity, reinter the remains and burial items on the property in a location that will not be subject to further disturbance.

California Administrative Code
Section 4308, Archaeological Features, of Title 14 of the California Administrative Code provides that: “No person shall remove, injure, disfigure, deface, or destroy any object of archaeological, or historical interest or value.”
California Code of Regulations
Title 14, Section 1427 California Code of Regulations Title 14, Section 1427 provides that: “No person shall collect or remove any object or thing of archaeological or historical interest or value, nor shall any person injure, disfigure, deface or destroy the physical site, location or context in which the object or thing of archaeological or historical interest or value is found”.

Traditional Tribal Cultural Places Act (California Senate Bill 18) California Senate Bill 18 (SB 18), enacted in 2004 and referred to as the Traditional Tribal Cultural Places Act, requires city and county governments to consult with California Native American tribes during the adoption of a General Plan or Specific Plan amendment to help protect traditional tribal cultural places through local land use planning before land use decisions are finalized. The intent of involving Tribes at early planning stages is to allow consideration of cultural places in the context of broad local land use policy, before individual site-specific, project-level land use decisions are made by a local government. SB18 requires local governments to provide opportunities for early consultation for projects that include the adoption and amendment of both general plans (defined in Government Code § 65300 et seq.) and specific plans (defined in Government Code § 65450 et seq.) and the designation of open space in a General Plan. To comply with SB 18, local governments must follow the consultation requirements identified below:
• Local governments must request a list of potentially affiliated tribes from the NAHC; • Tribes identified by the NAHC must be formally offered consultation; • Tribes have 90 days to request consultation after receiving notice; and Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-10
• The goal is to reach mutually agreeable measures to preserve or mitigate impacts to Tribal cultural places.

SB 18 applies to both federally recognized Tribes and non-federally recognized California Native American Tribes listed by the NAHC that are culturally affiliated with the planning area for the Project. SB 18 is focused on long-range planning whereas Assembly Bill 52 (AB 52) applies to CEQA review of individual projects, addressing impacts to Tribal Cultural Resources (TCRs).

Consultation under SB 18 does not replace or satisfy AB 52 consultation requirements.

California Assembly Bill 52
AB 52, enacted in 2014, amended CEQA to formally recognize and protect TCRs and to require government-to-government consultation with California Native American Tribes during the environmental review process of a project to ensure the project would affect those resources. AB 52 amended Section 5097.94 of, and added Sections 21073, 21074, 21080.3.1, 21080.3.2, 21802.3, 21083.09, 21084.2, and 21084.3 to the PRC relating to Native Americans. AB 52 was adopted to ensure that tribal cultural resources are identified and considered early in the CEQA process, before irreversible project decisions are made. By requiring improved coordination between CEQA lead agencies, project proponents, and Tribes, it assumes that conflicts and delays would be avoided and respect for Tribal sovereignty and cultural heritage would be strengthened by integrating Tribal knowledge in planning decision-making. AB 52 applies to all projects subject to CEQA that include the filing of a NOP (generally meaning EIRs), Notice of Negative Declarations, and Notice of Mitigated Negative Declarations on or after July 1, 2015.14 The PRC now establishes that “[a] project with an effect that may cause a substantial adverse change in the significance of a tribal cultural resource is a project that may have a significant effect on the environment.” (PRC Section 21084.2.) To help determine whether a project may have such an effect, the PRC requires a lead agency to consult with any California Native American tribe that requests consultation and is traditionally and culturally affiliated with the geographic area of a proposed project. That consultation must take place prior to the determination of whether a negative declaration, mitigated negative declaration, or environmental impact report is required for a project (PRC § 21080.3.1.). If a lead agency determines that a project may cause a substantial adverse change to tribal cultural resources, the lead agency must consider measures to mitigate that impact. Public Resources Code § 21084.3 (b)(2) provides examples of mitigation measures that lead agencies may consider to avoid or minimize impacts to tribal cultural resources.

Section 21074 of the PRC defines “tribal cultural resources.” In brief, in order to be considered a “tribal cultural resource,” a resource must be either:

1. Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe that are either of the following:
a. Included or determined to be eligible for inclusion in the California Register of Historical Resources.
b. Included in a local register of historical resources as defined in subdivision (k) of Section 5020.1. 2.
14 Governor’s Office of Land Use and Climate Innovation (previously the Governor’s Office of Planning and Research). 2014. State of California Tribal Consultation Guidelines, Supplement to General Plan Guidelines. Available at: https://nahc.ca.gov/wp- content/uploads/2019/04/SB-18-Tribal-Consultation-Guidelines.pdf. Accessed February 2026.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-11

2. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Section 5024.1. The lead agency shall consider the significance of the resource to a California Native American tribe if it is:
a. A cultural landscape that meets the criteria of subdivision (a) is a tribal cultural resource to the extent that the landscape is geographically defined in terms of the size and scope of the landscape.
b. A historical resource described in Section 21084.1, a unique archaeological resource as defined in subdivision (g) of Section 21083.2, or a “nonunique archaeological resource” as defined in subdivision (h) of Section 21083.2 may also be a tribal cultural resource if it conforms with the criteria of subdivision (a).

Paleontological Resources
CEQA provides guidance relative to significant impacts on paleontological resources, indicating that a project would have a significant impact on paleontological resources if it disturbs or destroys a unique paleontological resource or site or unique geologic feature. Section 5097.5 of the PRC specifies that any unauthorized removal of paleontological remains is a misdemeanor. Further, California Penal Code Section 622.5 sets the penalties for damage or removal of paleontological resources. CEQA documentation prepared for projects would be required to analyze paleontological resources as a condition of the CEQA process to disclose potential impacts. As of January 2018, paleontological resources are considered in the geological rather than cultural category. Therefore, paleontological resources are not summarized in the body of this section.

Please refer to Section 3.7, Geology and Soils, of this Draft EIR. A paleontological overview completed by the Western Science Center is provided in Appendix D, Cultural Resources Assessment, to this Draft EIR.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Open Space; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies in order to protect the City’s cultural resources.

Land Use Element
LAND/RD-P-3 Ensure that residential uses are located in proximity to commercial services, employment centers, public services, transportation routes, and recreational and cultural resources (l-1).

LAND/CD-P-41 Provide for the intensification of downtown Bakersfield for governmental, financial, professional office, retail, residential, cultural, specialty, and supporting uses (I-1).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-12
LAND/CD-P-43 Encourage renovation and the adaptive reuse of significant cultural and entertainment facilities downtown (l-5).

LAND/PF-P-50 Coordinate with the appropriate agencies so that adequate land and facilities are set aside for schools, parks, police/fire, libraries, cultural facilities, recreational facilities and other service uses to serve the community (1-2).

Parks Element
PARKS-P-16 Accommodate social, cultural and ethnic needs in the design and programming of recreational spaces and facilities (1-2).

City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the city in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic stability of agricultural, residential, commercial, industrial and other areas within the City, and to assure the orderly and beneficial development of such areas.

City of Bakersfield Historic Preservation Program
The City of Bakersfield’s Historical Preservation Program is dedicated to identifying, protecting, and celebrating the unique architectural, cultural, and historical resources that define the community’s rich heritage. By preserving significant buildings, sites, structures, and other features, the City aims to safeguard the stories and styles that shape our city’s identity. This effort fosters public understanding of the City’s past, encourages civic pride, supports educational and recreational opportunities, and promotes thoughtful development that honors the City’s diverse history. In doing so, the City also enhances its appeal to residents, tourists, and businesses alike, ensuring that the City’s shared heritage remains a vital and visible part of the City’s future.15 The City of Bakersfield is home to a variety of unique locations with significant historical, artistic, architectural, and cultural backgrounds. With locations having origins dating back to the 1800s, many places helped City become what it is today.16 The City maintains a local Register of Historic Places that includes 17 historic places and four areas of historic interest. Bakersfield also contains four places listed on the National Register.
17 City of Bakersfield Municipal Code
Chapter 15.72, Historical Preservation
This purpose of this chapter of City of Bakersfield Municipal Code (Municipal Code) is to promote the public health, safety and general welfare by providing for the identification, protection, enhancement, perpetuation and use of improvements, buildings, structures, signs, objects, features, sites, places and areas within Bakersfield that reflect special elements of the city’s 15 City of Bakersfield. 2026. Historic Preservation webpage. Available at: https://www.bakersfieldcity.us/256/Historic-Preservation.

Accessed February 2026.
16 City of Bakersfield. 2026. Historic Preservation webpage. Available at: https://www.bakersfieldcity.us/256/Historic-Preservation.

Accessed February 2026.
17 City of Bakersfield. Bakersfield Register of Historic Places. Available at: https://content.civicplus.com/api/assets/ee46706a-491d- 4252-a2f2-b42a3f33988d. Accessed February 2026.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-13
architectural, artistic, cultural, engineering, aesthetic, historical, political, social and other heritage for the following reasons:

A. To safeguard the city’s heritage as embodied and reflected in such resources; B. To encourage public knowledge, understanding, and appreciation of the City’s past; C. To foster civic and neighborhood pride and a sense of identity based on the recognition and use of cultural resources;
D. To promote the enjoyment and use of cultural resources appropriate for the education and recreation of the people of the City;
E. To preserve diverse and harmonious architectural styles and design preferences of periods of the city’s history and to encourage complementary contemporary design and construction;
F. To protect and enhance the City’s attraction to tourists and visitors (thereby stimulating business and industry);
G. To identify as early as possible conflicts between the preservation of cultural resources and alternative land uses;
H. To integrate the preservation of cultural resources and the extraction of relevant data from such resources into public and private land management and development processes; I. To conserve valuable material and energy resources by ongoing use and maintenance of the existing built environment. (Ord. 4460 § 1, 2007)

4.5.2 Environmental Setting
A CRA for the Project Site was completed in February 2025 by BRC and is included in Appendix D, Cultural Resources Assessment, to this Draft EIR. The CRA prepared includes a cultural resources records search, additional research, intensive-level pedestrian field survey, NAHC Sacred Lands File Search, and vertebrate paleontological resources overview were conducted for the Project consistent with CEQA. This CRA is intended to determine whether cultural resources are located within the Project boundaries, whether any cultural resources are significant pursuant to the above-referenced regulations and standards, and to develop specific mitigation measures that will address potential impacts to existing or potential resources. The following sections include a summary of description of the environmental setting as provided in Appendix D.

Existing Conditions
As discussed in Chapter 2, Project Description, the approximately 46.16-acre Project Site is located south of Rosedale Highway, west of El Toro Viejo Road, east of Coffee Road, and north of Burlington Northern Santa Fe (BNSF) Main Line. The Project Site is bordered by various developments including commercial and residential uses to the west, a PG&E electric substation, railroad tracks and vacant land to the south, a commercial retail center to the north, and commercial retail uses and vacant land to the east. The Project Site is located in section 29, Township 29 South, Range 27 East, Mt Diablo Baseline and Meridian. It is depicted on the United States Geological Survey (USGS) Oildale, California (1968) 7.5-minute topographic quadrangles.

The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-14
paved driveway along Rosedale Highway and Coffee Road. Both Coffee Road and Rosedale Highway are improved with concrete curb and gutters, yet only Rosedale Highway is fully developed with a concrete sidewalk. Portion of Coffee Road is improved with concrete sidewalk.

Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Natural Setting
Prior to the introduction of large-scale agriculture and oil exploration, the San Joaquin River and Tulare Lake’s massive system of channels, sloughs, and tule-choked marshes defined the local ecosystem. As a result, the biotic character of the San Joaquin Valley was historically much more diversified than is presently evident. Large freshwater marshes and vast expanses of grassland supported a variety of wildlife, including grizzly bears and wolves (both locally extinct), tule elk, jackrabbits, quail, and numerous fish, rodents, reptiles and birds The Project Site’s elevation is approximately 370 to 380 feet above mean sea level (AMSL), located in the east portion of the southern San Joaquin Valley. Rainfall in the local area is approximately eight inches per year, on average, and the runoff is channeled from northeast to southwest. Local vegetation consistent non-native season grasses and Russian thistle. Dirt roads and natural clearings have revealed homogenous soils made up of fine silts that contain very few rocks, which exhibit no evidence of prehistoric or historic cultural utility within the Project Site.18 Cultural Setting
Prehistoric Setting
The Project is situated within the traditional boundaries of the Southern Valley Yokuts. This prehistoric population depended heavily on the Tulare, Buena Vista, and Kern Lakes and their connecting sloughs and rivers for sustenance and transportation. The local Southern Valley Yokuts, referred to as the Chuxoxi, represented one of the southernmost Yokut political units and were associated with the channels and sloughs of the Kern River delta. Chuxoxi trade routes and rights to the delta allowed them to reap the benefits of the related perennial water sources. This enabled local populations to pursue a relatively sedentary lifestyle in an otherwise arid climate.

Prehistorically, such sedentism often coincides with a village-style residential model in which residential bases remain the same or seasonal, while specialized procurement parties are deployed to more remote areas to collect specialized resources. This village model has been locally supported by early ethnographers, who considered Yokuts unique in California for forming "true tribes" and for developing an unparalleled array of dialect. 19 Historical Setting
The first Europeans to establish contact with the Sothern Valley Yokuts were Spanish troops led by Captain Don Pedro Fages in pursuit of deserters. Father Francisco Garces also travelled through the San Joaquin Valley searching for an overland route from Yuma to Monterey. During his travels, Garces noted positive interactions with locals. The Mexican era (1821-1848) saw little notable cultural exchange between Mexicans and Southern Valley Yokuts, although an 1833 malaria epidemic devastated the local native population.

The ensuing American era, punctuated by California’s annexation into the United States in 1848, resulted in overwhelming Anglo settlement and seizing of Indian lands, and disrupted any 18 BCR Consulting. 2025. Cultural Resources Assessment Rosedale & Coffee Commercial Retail Center. See Appendix D. 19 BCR Consulting. 2025. Cultural Resources Assessment Rosedale & Coffee Commercial Retail Center. See Appendix D.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-15
remaining prehistoric Yokut influence in the San Joaquin Valley. Mining and ranching represented the early historical focus of the San Joaquin Valley, although the region’s abundant natural water supply, mild climate, and huge tracts of arable land soon led to the successful development of agriculture. The resulting diversion of local water and skyrocketing real estate values transformed the physical and economic character of the valley and have allowed it to remain one of the most productive agricultural regions in the world to this day.20 Project-Site Specific History
According to General Land Office Records, the Project Site was once part of a land patent granted to the Southern Pacific Railroad on April 6, 1876. By the 1940s, the subject property was owned by the Pacific Gas & Electric (PG&E) and contained a PG&E power plant which was in operation until the mid-1980s. The former oil pump site was located on the northern portion of the subject property and overlapped areas utilized by the PG&E plant that was demolished in 2013. By the mid-1980s through early 2000s, a Christmas tree farm was present within the boundaries of the oil pump site while it was in operation. The oil pump site continued to operate and draw oil from the Fruitvale oil reserve and was operated by DD Naturals Resources, LLC until it was recently taken offline.

4.5.3 Impact Analysis
Methodology
As discussed above, the analysis of potential impacts to cultural resources is based on the CRA prepared by BCR for the Project Site, included as Appendix D, and consistent with CEQA (PCR Chapter 2.6, Section 21083.2, and CCR Title 14, Chapter 3, Article 5, Section 15064.5) and Municipal Code Chapter 15.72. The CRA includes a resources search, field survey, and review of regulatory requirements and documents as further described below.

Records Search
On September 12, 2022, a records search was conducted by the SSJVIC at California State University, Bakersfield. This archival research reviewed the status of all recorded historic and prehistoric cultural resources, and survey and excavation reports completed within one half-mile of the Project Site. Additional resources reviewed included the National Register, the California Register, and documents and inventories published by the California OHP. These include the lists of California Historical Landmarks, California Points of Historical Interest, Listing of National Register Properties, and the Inventory of Historic Structures.

Data from the SSJVIC revealed that 20 previous cultural resources studies have taken place, and 14 cultural resources have been recorded within one half-mile of the Project Site. Three of the previous studies from the record search have assessed portions of the Project Site for cultural resources revealing that one cultural resource (a historic-period refuse scatter designated: P-15- 3290) has been previously recorded within its boundaries.

P-15-3290 was originally recorded as a domestic refuse site in 1991 by the Cultural Resource Facility at California State University, Bakersfield. The site contained various glass fragments, ceramics, and kitchen supplies. However, during the initial field survey and the updated field survey, BCR observed that the area has been subject to mechanical clearing and the site is presumed destroyed.
20 BCR Consulting. 2025. Cultural Resources Assessment Rosedale & Coffee Commercial Retail Center. See Appendix D.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-16
Field Survey
The field survey was intended to locate and document previously recorded or new cultural resources, including archaeological sites, features, isolates, and historic-period buildings, that exceed 45 years in age within defined Project boundaries. The Project Site was examined using 15-meter transect intervals, where accessible.

An initial intensive-level field survey of the Project Site was conducted on October 19, 2022, and an updated field survey of the Project Site was conducted on January 16, 2025. The Project Site has been completely disturbed by historic-period oil pumps, oil tanks, and related installations, and some recent demolition and excavation activity. Vegetation included sparse seasonal grasses in areas that have not been subject to asphalt paving or recent demolition and excavation.

Average visibility was approximately 50 percent and sediment comprised sandy silt with very few rocks
One previously recorded resource and four newly recorded historic-period resources were identified during the initial field visit, and they were all re-recorded/updated during the recent field survey in 2025. Table 4.5-1 – Recorded Cultural Resources at Project Site, below, identifies each resource, provides a detailed description, and summarizes its current condition.

Table 4.5-1 – Recorded Cultural Resources at Project Site Resource Description Status
P-15-3290 Originally recorded as a domestic refuse site in 1991 by the Cultural Resource Facility at California State University, Bakersfield. The site contained various glass fragments, ceramics, and kitchen supplies.

The area has been subject to
mechanical clearing and the
site is presumed destroyed.

PWK2203-H-1 Historic-period, 14-acre oil well and pump site located within the grounds of the former PG&E Kern Power Plant. During the initial survey in 2022, the Project Site contained four oil wells with pumping units, two 20-foot diameter oil and water storage tanks, and three wooden electrical distribution poles. The southeasternmost pump and two storage tanks were installed between 1952 and 1958, and the other three pumps were
installed between 1968 and 1984. At least one pump fed into the oil and water storage tanks, and it is assumed that the three pumps were associated with the former tanks on the Project Site The wooden electrical distribution poles supplied power to electric drive motors on each of the units
All oil well pumps and the
water and oil storage tanks
had been demolished and
removed from the Project Site
and the oil well were in the
process of being capped by
the time of the 2025 field
survey was completed. The
wooden electrical distribution
poles have not been altered.

PWK2203-H-4 Historic-period, 230 KV double circuit lattice steel transmission tower within the Midway-Kern 230 KV alignment. Historic aerials indicate it was established by 1958 and it continues to operate and distribute electricity from the PG&E Kern
substation adjacent to the tower.

No visible alterations between
the initial and recent field
survey.

PWK2203-H-5 Historic-period, double circuit lattice steel transmission tower within the Kern Lerdo/Kern Oil 115 KV alignment. Historic aerials indicate that it was established by 1958 and continues to operate and distribute electricity from the PG&E Kern substation adjacent to the tower.

No visible alterations between
the initial and recent field
survey.

PWK2203-H-6. Historic-period, double circuit lattice steel transmission tower shared by the Kern Oil Famoso 70 KV and Kern Live Oak 115 KV alignment. Historic aerials indicate that it was established by 1958 and continues to operate and distribute electricity from the PG&E Kern substation adjacent to the tower.

No visible alterations between
the initial and recent field
survey.

Source: BCR Consulting, 2025.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-17
Digital photographs were taken at various points within the Project Site (Appendix D). Any cultural resources found were recorded on DPR 523 forms consistent with the California OHP Instructions for Recording Historical Resources in the field.

Historical Resources Significance Evaluation
As discussed above, during the field survey, the historic-period refuse scatter designated P-15- 3290 could not be identified. The CRA presumed it was destroyed and does not merit further consideration as a potential historical resource. However, the other four resources identified in Table 4.5-1, above, have been evaluated for recordation as historical and archeological resources consistent with CEQA.

California Register Evaluation
As discussed under Section 4.5.1, Regulatory Setting, a property is eligible for inclusion on the California Register or as a City Landmark if one or more of the following criteria is met:
• Criteria 1: It is associated with the events that have made a significant contribution to the broad patterns of local or regional history, or the cultural heritage of California or the United States;
• Criteria 2: It is associated with the lives of persons important to local, California, or United States history;
• Criteria 3: It embodies the distinctive characteristics of a type, period, region, or method of construction, represents the work of a master, possesses high artistic values; and/or • Criteria 4: It has yielded, or has the potential to yield, information important to the prehistory or history of the local area, California, or the nation.

In addition to meeting one or more of the above criteria, the California Register requires that sufficient time has passed since a resource’s period of significance to “obtain a scholarly perspective on the events or individuals associated with the resources.” (CCR 4852 [d][2]). The California Register also requires that a resource possesses integrity. Table 4.5-2, California Register Eligibility Evaluation, evaluates the four resources identified and whether they meet the California Register criteria.

Table 4.5-2 – California Register Eligibility Evaluation Criteria 1 Criteria 2 Criteria 3 Criteria 4 Conclusion
Resource: PWK2203-H-1
Not Eligible. Although the
Project Site was
connected to oil
exploration and
development in the
County, the installations
occurred late in this era
and were regionally
common. Research has
not indicated a close
association between these
resources and any
important events.

Not Eligible.

Substantial
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.

Not Eligible. The oil
pumps (removed prior to
the 2025 field survey),
utility towers, and tanks
lacked architectural
distinction and did not
display significant or
unique features. They do
not significantly represent
the work of an important
creative individual or
possess high artistic
values.

Not Eligible.

The Project
Site has not
and is not likely
to yield
information
important in
prehistory or
history.

Not a
recommended
historical
resource under
CEQA.

Resource: PWK2203-H-4
Not Eligible. Substantial
research has not indicated
Not Eligible.

Substantial
Not Eligible. The
transmission tower is a
Not Eligible.

The Project
Not a
recommended
Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-18
a close association
between this transmission
tower and any important
events. Although it is
connected with electrical
development and
transmission in the
County, a single tower
does not demonstrate that
connection in any
significant way.
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.
utilitarian structure. It
lacks architectural
distinction and does not
display significant
elements of the era during
which it was constructed.

It does not represent the
work of an important
creative individual or
possesses high artistic
values.

Site has not
and is not likely
to yield
information
important in
prehistory or
history.
historical
resource under
CEQA.

Resource: PWK2203-H-5
Not Eligible. Substantial
research has not indicated
a close association
between this transmission
tower and any important
events. Although it is
connected with electrical
development and
transmission in the
County, a single tower
does not demonstrate that
connection in any
significant way.

Not Eligible.

Substantial
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.

Not Eligible. The
transmission tower is a
utilitarian structure. It
lacks architectural
distinction and does not
display significant
elements of the era during
which it was constructed.

It does not represent the
work of an important
creative individual or
possesses high artistic
values.

Not Eligible.

The Project
Site has not
and is not likely
to yield
information
important in
prehistory or
history.

Not a
recommended
historical
resource under
CEQA.

Resource: PWK2203-H-6
Not Eligible. Substantial
research has not indicated
a close association
between this transmission
tower and any important
events. Although it is
connected with electrical
development and
transmission in the
County, a single tower
does not demonstrate that
connection in any
significant way.

Not Eligible.

Substantial
research has
failed to connect
the Project Site
with the lives of
persons
important in
California’s past.

Not Eligible. The
transmission tower is a
utilitarian structure. It
lacks architectural
distinction and does not
display significant
elements of the era during
which it was constructed.

It does not represent the
work of an important
creative individual or
possesses high artistic
values.

Not Eligible.

The Project
Site has not
and is not likely
to yield
information
important in
prehistory or
history.

Not a
recommended
historical
resource under
CEQA
Source: BCR Consulting, 2025.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance21 to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5.
• Cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5.
• Disturb any human remains, including those interred outside of dedicated cemeteries. 21 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-19
Project Impacts
Threshold CUL-1 Would the project cause a substantial adverse change in the significance of a historical resource pursuant to § 15064.5? Impact Analysis
The records search conducted for the Project has revealed that 20 previous cultural resource studies have taken place, and 14 cultural resources have been identified within one half-mile of the Project Site. Three of the previous studies assessed portions of the Project Site for cultural resources, and one resource (a historic-period refuse scatter designated P-15-3290) was previously identified within the Project Site boundaries; however, during the field survey conducted by BCR, the resource was not able to be located and assumed to be destroyed. Four additional historic-period cultural resources were identified and evaluated for California Register.

As discussed above, under Historical Resources Significance Evaluation, these identified resources were recommended not eligible for the California Register and therefore are not considered a historic resource under CEQA consistent with CEQA Guidelines Section 15064.5.

As such, impacts to historical resources would be less than significant with no mitigation measures required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact.

Threshold CUL-2: Would the project cause a substantial adverse change in the significance of an archaeological resource pursuant to § 15064.5? Impact Analysis
Although neither the record search nor the field visit conducted as part of the CRA identified archeological resources, ground-disturbing activities have the potential to reveal buried deposits not observed on the surface. Additionally, as some development occurred before the implementation of regulations related to the identification of archaeological resources, it is also possible that archaeological resources were present on the Project Site and were not recorded before or during development.

Therefore, the Project would implement Mitigation Measure (MM) CUL-1, which would require that field personnel be alerted to the possibility of buried prehistoric or historic cultural deposits prior to initiation of ground-disturbing activities. MM CUL-1 would also provide a process for treatment of any archaeological resources inadvertently discovered during Project implementation. Implementation of MM CUL-1 shall also require a cessation of construction activity and consultation with a qualified archaeologist to evaluate the Project Site and make the necessary findings. As such, with the implementation MM CUL-1, impacts to archaeological resources would be less than significant with mitigation incorporated.

Mitigation Measures
The following mitigation measure is applicable to the Project and would be implemented to reduce impacts to a less than significant level.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-20
MM CUL-1 Inadvertent Discovery of Cultural Resources. If suspected cultural resources are encountered during ground disturbance activities, all work within 100 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. If cultural resources are discovered that may have relevance to Native Americans, the specialist or Project Applicant shall provide written notice to the City of Bakersfield, Native American Heritage Commission, and any other appropriate individuals, agencies, and/or groups as determined by the specialist in consultation with the City of Bakersfield to receive input regarding treatment and disposition of the resource, which may include avoidance, testing, and/or excavation to prevent destruction of the resource and/or to allow documentation of the resource for research potential. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield.

Level of Significance After Mitigation
Less than significant impact with mitigation incorporated.

Threshold CUL-3: Would the project disturb any human remains, including those interred outside of dedicated cemeteries?
Impact Analysis
The CRA did not identify any archeological resources on the Project Site, and due to the level of previous development, there is a low probability that intact surface or subsurface archaeological resources or human remains would be discovered during construction. However, as some development occurred before the implementation of regulations related to the identification of human remains, it is possible human remains were present within the Project Site and were not recorded before or during development. In the event that any human remains, or related resources are discovered, such resources would be treated in accordance with all applicable federal, state, and local regulations and guidelines for disclosure, recovery, relocation, and preservation, including State Health and Safety Code. If human remains are encountered during any project activities, State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to PRC Section 5097.98. As such, the Project would implement MM CUL-2, Inadvertent Discovery of Human Remains, requiring a cessation of construction activity until the County coroner can evaluate the discovery and made the necessary findings, would provide a process for treatment of any human remains inadvertently discovered during Project implementation. With implementation of this MM CUL-2, impacts to human remains would be less than significant with mitigation incorporated.

Mitigation Measures
The following mitigation measure is applicable to the Project and would be implemented to reduce impacts to a less than significant level.

Riverview Market Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-21
MM CUL-2 Inadvertent Discovery of Human Remains. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5.

The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Unless otherwise required by law, the site of any reburial of Native American human remains or associated grave goods shall not be disclosed and shall not be governed by public disclosure requirements of the California Public Records Act. The coroner, pursuant to the specific exemption set forth in California Government Code Section 6254 (r), parties, and Lead Agencies, will be asked to withhold public disclosure information related to such reburial, pursuant to the specific exemption set forth in California Government Code Section 6254 (r).

Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Cumulative Impacts
The geographic scope of the cumulative cultural resources analysis is the Project Site and surrounding area as evaluated in the CRA. Impacts to cultural resources are generally site-specific because the integrity of any specific cultural resource is often dependent upon the activities occurring in its immediate vicinity. As discussed in Section 4.5.4, Impact Analysis, none of the cultural resources identified on the Project Site have been determined to meet the definition of historic resources under CEQA, and thus, the Project would have neither a direct nor indirect impact on historical resources. Accordingly, the proposed Project would not contribute cumulatively to impacts to historic resources.

The cumulative projects identified in Section 3.3, Cumulative Development, would all likely require some level of excavation with potential for disturbance of subsurface archaeological resources or human remains. As discussed in discussion of Impact CUL-2 and Impact CUL-3, the proposed Project would implement MM CUL-1 and MM CUL-2 and comply with applicable regulations pertaining to the inadvertent discovery and proper treatment of these resources. This would reduce any potential impacts to less than significant. Likewise, the cumulative projects would be required to comply with applicable federal, State, and local regulations pertaining to these resources. Therefore, cumulative impacts are less than significant with mitigation incorporated.

Mitigation Measures
Implement MM CUL-1 and MM CUL-2.

Level of Significance After Mitigation
Cumulative impacts related to cultural resources would be less than significant with implementation of MM CUL-1 and MM CUL-2.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.5 Cultural Resources
City of Bakersfield – SCH No. 2025101507 4.5-22
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.6-1

4.6 Energy
This section of the Draft EIR addresses the potential impacts to energy associated with construction and operation of the proposed Project. This discussion includes information regarding the regulatory setting, the environmental setting, and potential impacts to energy. A technical report addressing energy was prepared for the proposed Project and is included as, Appendix B: Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.

4.6.1 Regulatory Setting
Federal
Federal Energy Policy and Conservation Act
The Energy Policy and Conservation Act of 1975 was established in response to the 1973 oil crisis. The act created the Strategic Petroleum Reserve, established vehicle fuel economy standards, and prohibited the export of U.S. crude oil (with a few limited exceptions). It also created Corporate Average Fuel Economy (CAFE) standards for passenger cars starting in model year 1978. The CAFE Standards are updated periodically to account for changes in vehicle technologies, driver behavior, and/or driving conditions.

The federal government issued new CAFE standards in 2012 for model years 2017 to 2025, which required a fleet average of 54.5 miles per gallon (mpg) in 2025. On March 30, 2020, the EPA finalized the updated CAFE and greenhouse gas (GHG) emissions standards for passenger cars and light trucks and established new standards covering model years 2021 through 2026, known as the Safer Affordable Fuel Efficient (SAFE) Vehicles Final Rule for Model Years 2021 to 2026.

On December 21, 2021, under the direction of Executive Order 13990 issued by President Biden, the National Highway Traffic Safety Administration (NHTSA) repealed SAFE Vehicles Rule Part One, which had preempted State and local laws related to fuel economy standards. In addition, on March 31, 2022, the NHTSA finalized new fuel standards that will increase fuel efficiency by eight percent annually for model years 2024 to 2025 and by 10 percent for model year 2026.

Overall, the new CAFE standards require a fleet average of 49 mpg for passenger vehicles and light trucks for model year 2026, which will be a 10-mpg increase compared to model year 2021 (NHTSA 2022).

On June 7, 2024, the NHTSA announced final CAFE standards for passenger cars and light trucks built in model years 2027 to 2031 and final fuel efficiency standards for heavy-duty pickup trucks and vans built in model years 2030 to 2035. The final rules establish standards that would require an industry fleetwide average of approximately 50.4 mpg for passenger cars and light trucks in model year 2031, by increasing fuel economy by two percent year over year for passenger cars (model years 2027–2031) and for light trucks (model years 2029–2031). For heavy-duty pickup trucks and vans, the final rule would increase fuel efficiency at a rate of 10 percent per year (model years 2030–2032) and eight percent per year (model years 2033–2035) (NHTSA 2024).

In June 2025, NHTSA published a final rule, “Resetting the Corporate Average Fuel Economy Program.” The rule identifies factors statutorily prohibited from consideration when setting maximum feasible fuel economy standards under the Energy Policy and Conservation Act of 1975, the Energy Independence and Security Act of 2007, and other applicable laws. It also describes NHTSA’s authority to bring the CAFE program into compliance with relevant statutory requirements, in accordance with President Trump’s “Unleashing American Energy” Executive Order and the Secretary’s “Fixing the CAFE Program” Memorandum. The rule also describes Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-2
NHTSA’s interpretation of its authority for a commercial medium- and heavy-duty on-highway vehicle and work truck fuel efficiency improvement program to establish the necessary legal foundation to bring that program into compliance with law. This rule itself does not change existing CAFE or medium- and heavy-duty standards. During the rulemaking process for replacement standards, NHTSA will exercise its enforcement authority regarding all existing CAFE and medium- and heavy-duty standards in accordance with the interpretation set forth in this rulemaking.

Energy Independence and Security Act of 2007
The Energy Independence and Security Act of 2007 (Public Law 110-140) seeks to provide the nation with greater energy independence and security by increasing the production of clean renewable fuels; improving vehicle fuel economy; and increasing the efficiency of products, buildings, and vehicles. It also seeks to improve the energy performance of the federal government. The Act set increased CAFE standards, the Renewable Fuel Standard, appliance energy efficiency standards, and building energy efficiency standards, and accelerated research and development tasks on renewable energy sources (e.g., solar energy, geothermal energy), carbon capture, and sequestration.

State
Warren-Alquist Act
Established in 1974, the Warren-Alquist Act created the California Energy Commission (CEC) in response to the energy crisis of the early 1970s and the state’s unsustainable growing demand for energy resources. The CEC’s core responsibilities include advancing State energy policy, encouraging energy efficiency, certifying thermal power plants, investing in energy innovation, developing renewable energy, transforming transportation, and preparing for energy emergencies. The Warren-Alquist Act is updated periodically through legislative bills to address current energy needs and issues.

Renewables Portfolio Standard
Senate Bills 1078, 107, and X1-2 and Executive Order S-14-08 The California Renewables Portfolio Standard (RPS) Program was established in 2002 under SB 1078 (Sher) and 107 (Simitian). The RPS program required investor-owned utilities, electric service providers, and community choice aggregators to increase the use of eligible renewable energy resources to 33 percent of total procurement by 2020. Initially, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least one percent in order to reach at least 20 percent by December 30, 2010. Executive Order S-14-08 was signed in November 2008 and expanded the state’s Renewable Energy Standard to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2). The California Public Utilities Commission is required to provide quarterly progress reports on RPS goals. This has accelerated the development of renewable energy projects throughout the state. For the year 2020, the three largest retail energy utilities provided an average of 43 percent of their supplies from renewable energy sources. Community choice aggregators provided an average of 41 percent of their supplies from renewable sources.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-3
Senate Bill 350
Senate Bill 350 (De Leon) was signed into law in September 2015. SB 350 establishes tiered increases to the RPS of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. SB 350 also set a new goal to double the energy efficiency savings in electricity and natural gas through energy efficiency and conservation measures.

Senate Bill 100
On September 10, 2018, Governor Brown signed SB 100, which replaced SB 350 requirements.

Under SB 100, the RPS for public-owned facilities and retail sellers consists of 44 percent renewable energy by 2024, 52 percent by 2027, and 60 percent by 2030. SB 100 also established a new RPS requirement of 50 percent by 2026. The bill establishes an overall state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under the bill, the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.

Senate Bill 1020
SB 1020 was signed into law on September 16, 2022. It requires renewable energy and zero-carbon resources to supply 90 percent of all retail electricity sales by 2035 and 95 percent by 2040. Additionally, SB 1020 requires all state agencies to procure 100 percent of electricity from renewable energy and zero-carbon resources by 2035.

California Building Code: Building Energy Efficiency Standards Energy conservation standards for new residential and nonresidential buildings were adopted by the California Energy Resources Conservation and Development Commission (now the CEC) in June 1977 (24 California Code of Regulations [CCR] Part 6). Part 6 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow for consideration and possible incorporation of new energy-efficiency technologies and methods.

The 2022 Building Energy Efficiency Standards were adopted on August 11, 2021, and went into effect on January 1, 2023. The 2022 standards encourage efficient electric heat pumps, establish electric-ready requirements for new homes, expand solar photovoltaic (PV) and battery storage standards, strengthen ventilation standards, and more. The 2022 standards require mixed-fuel single-family homes to be electric-ready to accommodate the replacement of gas appliances with electric appliances. In addition, the standards also include prescriptive PV system and battery requirements for high-rise, multifamily buildings (i.e., more than three stories) and noncommercial buildings such as hotels, offices, medical offices, restaurants, retail stores, schools, warehouses, theaters, and convention centers (CEC 2021). The 2025 Building Energy Efficiency Standards were adopted on September 24, 2024, and became effective and replaced the 2022 Building Energy Efficiency Standards on January 1, 2026. Updates under the 2025 Building Energy Efficiency Standards include electric-ready requirements for some multi-family buildings and commercial kitchens, and solar and battery energy storage requirements for assembly buildings, including religious worship, sports, and recreational buildings.

Under the prescriptive pathway, a new development’s building design is considered the “Standard Design Building,” which represents the energy-efficiency performance of that project should it Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-4
include all prescribed features (e.g., solar, battery storage) with no additional energy-efficiency features beyond what is required at minimum under the mandatory requirements and prescriptive pathway. A project may still demonstrate compliance using the performance pathway without inclusion of prescriptive features like solar or battery storage. However, that building design must match or exceed the energy efficiency performance of the Standard Design Building. For example, if a project would be required to include solar and battery storage under the prescriptive pathway, it can choose to comply with the performance pathway and not include solar and battery storage so long as it can demonstrate that it would achieve the same energy-efficiency performance as if solar and battery storage were included.

California Building Code: CALGreen
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11), or “CALGreen,” was adopted as part of the California Building Standards Code. CALGreen established planning and design standards for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, and internal air contaminants.1 The mandatory provisions of CALGreen became effective January 1, 2011, and were last updated in 2025. The 2025 CALGreen standards became effective January 1, 2026.

Section 5.408 of CALGreen also requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.
2006 Appliance Efficiency Regulations
The 2006 Appliance Efficiency Regulations (20 CCR Sections 1601–1608) were adopted by the CEC on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The regulations include standards for both federally regulated appliances and non–federally regulated appliances. Though these regulations are now often viewed as “business as usual,” they exceed the standards imposed by all other states, and they reduce GHG emissions by reducing energy demand.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. Chapter V, “Conservation/Air Quality Element,” of the Metropolitan Bakersfield General Plan contains the following energy-related policies that may apply to the Project:

Policy 6. Participate in alternative fuel programs.

Policy 29. Encourage the use of alternative fuel and low or zero-emission vehicles. 1 The green building standards became mandatory in the 2010 edition of the code.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-5

4.6.2 Environmental Setting
The Project Site is currently undeveloped and highly disturbed and does not generate energy demands. The Project Site is in the Pacific Gas and Electric Company (PG&E) service area for both electricity and natural gas. PG&E is a publicly traded utility company that generates, purchases, and transmits energy under contract with the California Public Utilities Commission.

Its service territory is 70,000 square miles, extending north to south from Eureka to Bakersfield, and east to west from the Sierra Nevada range to the Pacific Ocean.

Electricity
The electricity distribution system of PG&E consists of 106,681 circuit miles of electric distribution lines and 18,466 circuit miles of interconnected transmission lines. PG&E electricity is generated by a combination of sources such as coal-fired power plants, nuclear power plants, and hydroelectric dams as well as newer sources of energy, such as wind turbines and photovoltaic plants or “solar farms.” “The grid,” or bulk electric grid, is a network of high-voltage transmission lines linked to power plants in the PG&E system. The distribution system consists of lower-voltage secondary lines at the street and neighborhood level, with overhead or underground distribution lines, transformers, and individual service “drops” that connect to the individual customer.

Total electricity consumption in PG&E’s service area was 75,338 gigawatt-hours in 2024. One gigawatt-hour is equivalent to one million kilowatt-hours (kWh). Sources of electricity sold by PG&E for its base plan in 2024, the latest year for which data are available, were:
• 23 percent renewable, consisting mostly of solar and wind • 12 percent of large hydroelectric
• 2 percent natural gas
• 63 percent nuclear
Natural Gas
PG&E gas transmission pipeline systems serve approximately 4.5 million gas customers in northern and central California. The system is operated under an inspection and monitoring program. The system operates in real time on a 24-hour basis and includes leak inspections, surveys, and patrols of the pipelines. PG&E also adopted the Pipeline 2020 program, which aims to modernize critical pipeline infrastructure, expand the use of automatic or remotely operated shut-off valves, catalyze development of next-generation inspection technologies, develop industry-leading best practices, and enhance public safety partnerships with local communities, public officials, and first responders. Total natural gas consumption in PG&E’s service area was 4,255 million therms for 2024.

Transportation Fuels
California contains a network of crude oil pipelines that connects production areas to oil refineries in the Los Angeles area, the San Francisco Bay Area, and the Central Valley. California oil refineries also process Alaskan and foreign crude oil received in ports in Los Angeles, Long Beach, and the San Francisco Bay Area. Crude oil production in California and Alaska is in decline, and California refineries have become increasingly dependent on foreign imports.

Foreign supplies, led by Iraq, Brazil, and Guyana in 2024, provide over half of the crude oil refined in California. According to the United States Energy Information Administration, California’s field Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-6
production of crude oil has steadily declined since the mid-1980s, with a total production of approximately 110 million barrels in 2024. In Kern County, including all incorporated cities, approximately 406 million gallons of gasoline and 225 million gallons of diesel fuel were sold in 2024, the latest year of available data.

4.6.3 Impact Analysis
Methodology
The analysis of electricity and natural gas usage for the proposed project is based on the California Emissions Estimator Model (CalEEMod) version 2022.1, which quantifies energy use associated with proposed land uses. In addition, fuel consumption data from EMFAC2021 version

1.0.2 and OFFROAD version 1.1.3. are used to quantify fuel usage related to construction equipment operation and construction- and operation-related vehicle trips (e.g., construction worker trips and patron vehicle trips).

The operational-phase, project-related emissions are based on the development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed project. Construction emissions are based on information provided for the Project. Where specific information was not available, CalEEMod default values were utilized.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance2to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation; or
• Conflict with or obstruct a state or local plan for renewable energy or energy efficiency.

Project Impacts
Threshold ENG-1: Would the project result in potentially significant environmental impact due to wasteful, inefficient, or unnecessary consumption of energy resources during project construction or operation? Impact Analysis
Construction
Construction of the proposed project would create temporary increased demands for electricity and vehicle fuels compared to existing conditions and would result in short-term energy use from off-road mobile equipment and on-road vehicles.

Construction Equipment Electrical Energy
Construction of the Project would not require electricity to power most construction equipment.

Electricity use during the construction of the proposed Project would vary during different phases 2 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-7
of construction. The majority of construction equipment would be gasoline or diesel-powered.

Later construction phases (e.g., vertical building construction) could result in the use of electricity-powered equipment for interior construction and architectural coatings. However, while not quantified, it is anticipated that the majority of electric-powered construction equipment would be hand tools (e.g., power drills, table saws) and lighting, which would result in minimal electricity usage during construction activities. Additionally, it is anticipated that such equipment would be used on an as-needed basis. Therefore, project-related construction activities would not result in wasteful or unnecessary electricity demands.

Construction Equipment Natural Gas Energy
It is not anticipated that construction equipment used for the Project would be powered by natural gas, and no other natural gas demand is anticipated during construction. Therefore, project-related construction activities would not result in wasteful or unnecessary natural gas usage.

Off-Road and On-Road Transportation Energy
Transportation energy use during the construction of the proposed Project would come from delivery vehicles, haul trucks, and construction employee vehicles, as well as off-road construction equipment. It is anticipated that the majority of off-road construction equipment, such as what is used during demolition and grading, would be gas or diesel-powered. The use of energy resources by these vehicles would fluctuate according to the phase of construction. Fuel consumption during construction (years 2026 through 2027) was calculated based on fuel consumption data from the EMFAC2021 (v. 1.0.2) and OFFROAD (v. 1.1.3) databases. The results are shown in Table 4.6-1, Construction-Related Fuel Usage.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-8
Table 4.6-1 – Construction-Related Fuel Usage
Project Component
Gas Diesel Electricity
VMT Gallons VMT Gallons VMT kWh
Construction Worker Commute
Phase 1 317,886 12,000 452 12 9,053 3,299
Phase 2 196,259 7,261 266 7 6,280 2,290
Left-Turn Lane 317,886 12,000 452 12 9,053 3,299
Traffic Signal Installation 196,259 7,261 266 7 6,280 2,290 Subtotal 522,393 19,572 729 19 15,568 5,675
Construction Vendor Trips
Phase 1 3,516 733 50,463 6,922 0 0
Phase 2 1,067 220 15,980 2,160 0 0
Left-Turn Lane 3,516 733 50,463 6,922 0 0
Traffic Signal Installation 1,067 220 15,980 2,160 0 0
Subtotal 4,676 972 67,769 9,264 0 0
Construction Truck Haul and Onsite Truck Trips
Phase 1 0 0 25 4 0 0
Phase 2 0 0 23 4 0 0
Left-Turn Lane 0 0 25 4 0 0
Traffic Signal Installation 0 0 23 4 0 0
Subtotal 0 0 2,947 467 0 0
Construction Off-Road Equipment
Phase 1 N/A 744 N/A 10.265 N/A 0
Phase 2 N/A 272 N/A 8,350 N/A 0
Left-Turn Lane N/A 14 N/A 625 N/A 0
Traffic Signal Installation N/A 0 N/A 167 N/A 0
Subtotal N/A 1,030 N/A 19,827 N/A 0
Total 527,069 21,574 71,446 29,578 15,568 5,675
Sources: Appendix B
Notes: VMT=vehicle miles traveled; kWh=kilowatt hour
To limit wasteful and unnecessary energy consumption from transportation, the construction contractors would minimize nonessential idling of construction equipment during construction in accordance with 13 CCR Article 4.8, Chapter 9, Section 2449, which limits nonessential idling of diesel-powered off-road equipment to five minutes. In addition, the Project Site is served by numerous regional freeway systems (e.g., State Routes 99, 58, and 178) that provide the most direct routes from various areas of the region. Moreover, all construction equipment would cease operating upon completion of the Project construction. Thus, energy use during the construction of the proposed Project would not be considered inefficient, wasteful, or unnecessary.

Operation
Operation of the proposed project would create additional demands for electricity and natural gas compared to existing conditions and would result in increased transportation energy use.

Operational energy use would include heating, cooling, and ventilation of buildings; water heating; Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-9
operation of electrical systems; use of on-site equipment and appliances; and indoor, outdoor, perimeter, and parking lot lighting.

Electrical Energy
Operation of the proposed Project would consume electricity for various purposes, including but not limited to cooling and ventilation of buildings; operation of electrical systems; lighting; and use of on-site equipment and appliances. Electrical service to the proposed Project would be provided by PG&E through connections to existing off-site electrical lines and new on-site infrastructure.

As shown in Table 4.6-2, Project Grid Electricity Demand, the proposed Project would have a total electricity demand of 5,968,579 kilowatt-hours per year (kWh/yr).

Table 4.6-2: Project Electricity Demand
Land Use Electricity (kWh/year)1,2
Regional Shopping Center3 2,335,726
Medical Office 214,042
Convenience Mart/Gas Station 25,106
Fast Food Restaurant w/Drive Thru 753,849
Automated Carwash 48,643
Public Storage 429,593
Parking Lot 959,688
Renewable Electricity from Onsite PV Systems1
1,201,933
Project Total 5,968,579
Source: Appendix B
1 Based on information provided by the project applicant. 2 Accounts for total electricity use from proposed buildings and parking lots. See Appendix B. 3 The shown electricity demand represents the CalEEMod default electricity demand of 3,537,659 kWh per year minus the anticipated 1,201,933 kWh per year of renewable electricity that would be generated from the proposed on-site PV systems.

While the proposed Project would result in electricity demand, it would be designed and built to meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to increasing energy efficiency. In accordance with the 2025 Building Energy Efficiency Standards, the proposed Project would install rooftop PV systems and battery storage systems. These systems would contribute an estimated 1,201,933 kWh/yr of onsite renewable electricity to offset a portion of the Project's electricity demand from the grid. The on-site PV systems and battery storage—in addition to compliance with the RPS requirements by PG&E to increase electricity from renewable sources in the coming years—would further increase renewable electricity use.

Furthermore, compliance with CALGreen would contribute to reducing indoor water use, which would also contribute to minimizing electricity demand from the transport and distribution of water.

Thus, electricity use from the operation of the proposed Project would not be considered inefficient, wasteful, or unnecessary.

Natural Gas Energy
The proposed project would generate demand for natural gas due to the heating and cooling of the buildings and for water. As shown in Table 4.6-3, Project Natural Gas Demand, the proposed land uses would generate a natural gas demand of 6,150,142 kilobritish thermal units per year (kBTU/yr) under full buildout conditions. Development pursuant to the proposed Project would result in a net increase in natural gas demand. However, the proposed Project would be built to Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-10
meet the current Building Energy Efficiency Standards and CALGreen, which would contribute to optimizing the energy efficiency of the proposed buildings. For example, building insulation requirements would contribute to minimizing the use of natural gas for heating. Thus, overall, the proposed project would not result in wasteful or unnecessary natural gas demands.

Table 4.6-3: Project Natural Gas Demand
Land Use Electricity (kWh/year)1,2
Regional Shopping Center 3,280,464
Medical Office 364,604
Convenience Mart/Gas Station 14,278
Fast Food Restaurant w/Drive Thru 2,109,444
Automated Carwash 167,987
Public Storage 213,366
Parking Lot 0
Project Total 6,150,142
Source: Appendix B
Note: kBTU = kilo British thermal units
1 Based on information provided by the project applicant. 2 Accounts for total natural gas use from proposed buildings. See Appendix B Transportation Energy
The proposed Project would consume long-term transportation-related energy during operations from the use of motor vehicles. Estimates of transportation energy use are based on the overall vehicle miles travels (VMT) and EMFAC2021 fuel consumption data. Project-related vehicle trips would primarily be generated from customers and employees. Additional vehicle trips to the Project Site would include deliveries, waste pickup, and maintenance trips.

Table 4.6-4, Project Annual Operation-Related Fuel Usage, shows the annual energy usage from Project-related vehicle trips at full buildout. While the operation of the proposed Project would result in energy usage, the Project Site is within a half mile of bus stops for three Golden Empire Ticket bus routes (Routes 61, 82, and 84) and would be accessible from the existing surrounding sidewalks and class II bike lanes along Rosedale Highway and Coffee Road (IEG 2026). The proposed Project would also provide bicycle parking and lockers. These amenities could contribute to minimizing vehicle trips and VMT. In addition, fuel efficiency standards for automobiles are established nationwide under the CAFE standards, which are not directly applicable to residents or land use development projects, but to car manufacturers. Thus, future customers and employees of the proposed Project and the general population in the region do not have direct control in determining the fuel efficiency of vehicles manufactured and that are made available. However, compliance with the CAFE standards by car manufacturers would ensure that vehicles produced in future years have greater fuel efficiency and would generally result in an overall benefit of reducing fuel usage by providing the population of the City and region with more fuel-efficient vehicle options. Thus, the assumed and forecast general fuel efficiency based on EMFAC2021 data used to quantify Project-related transportation energy usage in Table

4.6-4 also applies to the population at large, and vehicles driven by Project customers and employees would not be any less efficient than the vehicles driven by the general population.

Thus, it is expected that operation-related fuel usage associated with the Project would not be considered inefficient, wasteful, or unnecessary.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-11
Table 4.6-4: Project Annual Operation-Related Fuel Usage Source
Gasoline Diesel CNG Electricity
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
Gallons
Annual
VMT1
Annual
kWh
Project
Vehicle
Trips
32,807,847 1,328,437 2,787,487 251,080 10,571 313 1,856,622 646,405 Source: Appendix B
Overall, the construction and operation of the proposed Project would not result in the inefficient, wasteful, or unnecessary consumption of energy. The Project would not cause or result in the need for additional energy-producing or transmission facilities. Therefore, any impact would be less than a significant impact.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold ENG-2: Would the project conflict with or obstruct a state or local plan for renewable energy or energy efficiency?
Impact Analysis
The following evaluates the consistency of the proposed project with California’s RPS program.

California Renewables Portfolio Standard
The statewide RPS goal is not directly applicable to individual development projects, but to utilities and energy providers such as PG&E, which would provide all of the electricity needs for the proposed Project. Compliance of PG&E in meeting the RPS goals would ensure that the State meets its objective of transitioning to renewable energy. The proposed Project would be subject to the 2025 Building Energy Efficiency Standards and, in compliance with those standards, would install battery storage and rooftop PV systems. These systems would support the RPS program and the statewide transition to renewable energy. Therefore, implementation of the Project would not conflict with or obstruct plans for renewable energy and energy efficiency.

Accordingly, any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
The area considered for cumulative impacts to electricity and natural gas supplies is the service area of PG&E. Other projects in the PG&E service area would be required to comply with the Building Energy Efficiency Standards and CALGreen, which would contribute to minimizing Riverview Marketplace Commercial Project
Environmental Impact Report 4.6 Energy
City of Bakersfield – SCH No. 2025101507 4.6-12
wasteful energy consumption and promoting renewable energy sources. As discussed in impact discussion ENG-1, construction- and operation-related energy impacts caused by the Project would not be considered inefficient, wasteful, or unnecessary. The Project would therefore not contribute to any cumulative energy impacts when considered together with cumulative development projects and would not be cumulatively considerable.

Mitigation Measures
No mitigation measures are required as impacts would be less than significant.

Level of Significance After Mitigation
No mitigation measures are required as impacts would be less than significant.

City of Bakersfield – SCH No. 2025101507 4.7-1

4.7 Geology and Soils
This Section discusses any potential environmental impacts associated with geology and soils that may result from implementation of the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to result in substantial either direct or indirect adverse physical impacts, including risk of loss, injury or death, associated with known earthquake faults, seismic ground-shaking or ground failure, landslides, soil erosion, unstable geologic unit, expansive soils, soil stability for septic systems, as well as paleontological resources. This Section evaluates potential impacts on geology and soils and identifies measures to reduce or avoid significant impacts.

The analysis is based on a review of relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts to geology and soils. Information in this Section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan); the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance);a Geotechnical Investigation prepared for the Project by Geotechnical Professionals, Inc., dated December 2025, included in Appendix E, Geotechnical Investigation, to this Draft EIR; and a Paleontological Overview prepared for the Project by the Western Science Center. The Paleontological Resources Overview is included in the Cultural Resources Assessment (CRA) prepared for the Project by BCR Consulting (BCR), dated February 14, 2025, and included in Appendix D, Cultural Resources Assessment, to this Draft EIR.

During the scoping period for the Project’s Environmental Impact Report (EIR), no comments were received in response to the Notice of Preparation (NOP) regarding geology and soils.

4.7.1 Regulatory Setting
Federal
Earthquake Hazards Reduction Act
The Earthquake Hazards Reduction Act of 1977 (Public Law 95-124) established the National Earthquake Hazards Reduction Program (Program) which is coordinated through the Federal Emergency Management Agency (FEMA), the United States Geological Survey (USGS), the National Science Foundation, and the National Institute of Standards and Technology.

The purpose of the Program is to establish measures for earthquake hazards reduction and promote the adoption of earthquake hazards reduction measures by federal, State, and local governments; national standards and model code organizations; architects and engineers; building owners; and others with a role in planning and constructing buildings, structures, and lifelines through:
(1) Grants, contracts, cooperative agreements, and technical assistance; (2) Development of standards, guidelines, and voluntary consensus codes for earthquake hazards reduction for buildings, structures, and lifelines; and (3) Development and maintenance of a repository of information, including technical data on seismic risk and hazards reduction.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-2
The Program is intended to improve the understanding of earthquakes and their effects on communities, buildings, structures, and lifelines through interdisciplinary research that involves engineering, natural sciences, and social, economic, and decisions sciences.

National Pollutant Discharge Elimination System Permit
The National Pollutant Discharge Elimination System (NPDES) permit program was established by the CWA to regulate municipal and industrial discharges to surface waters of the United States from their municipal separate storm sewer systems (MS4s). Federal NPDES permit regulations have been established for a broad range of discharges, including point-source municipal waste discharges and non-point-source stormwater runoff. NPDES permits generally identify effluent and receiving water limits on allowable concentrations and/or mass emissions of pollutants contained in the discharge; prohibitions on discharges not specifically allowed under the permit; and provisions that describe required actions by the discharger, including industrial pretreatment, pollution prevention, self-monitoring, and other activities.

State
Alquist-Priolo Earthquake Fault Zoning Act of 1972
The Alquist-Priolo Earthquake Fault Zoning Act (Public Resources Code [PRC], Section 2621 et seq.), regulates development and construction of buildings intended for human occupancy to avoid the hazard of surface fault rupture. The Alquist-Priolo Earthquake Fault Zoning Act categorizes faults as active, potentially active, and inactive. Historic and Holocene age faults are considered active, Late Quaternary and Quaternary age faults are considered potentially active, and pre‐Quaternary age faults are considered inactive. These classifications are qualified by the conditions that a fault must be shown to be “sufficiently active” and “well defined” by detailed site‐ specific geologic explorations to determine whether building setbacks should be established.

Seismic Hazards Mapping Act
The Seismic Hazards Mapping Act of 1990 (PRC, Sections 2690–2699), directs the California Department of Conservation (DOC) and California Geological Survey (CGS) to delineate Seismic Hazard Zones. The purpose of the Seismic Hazards Mapping Act is to reduce the threat to public health and safety and to minimize the loss of life and property by identifying and mitigating seismic hazards. Cities, counties, and State agencies are directed to use seismic hazard zone maps developed by CGS in their land‐use planning and permitting processes. The act requires that site-specific geotechnical investigations be performed prior to permitting most urban development projects within seismic hazard zones.

California Building Standards Code
The California Building Code (CBC) (California Code of Regulations [CCR], Title 24, Part 2), establishes minimum requirements for a building’s structural strength and stability to safeguard the public health, safety, and general welfare. Title 24 is assigned to the California Building Standards Commission, which, by law, is responsible for coordinating all building standards.

Section 19100 et seq. of the California Health and Safety Code establishes the State’s regulations for earthquake protection. This Section of the code requires structural designs to be capable of resisting likely stresses produced by phenomena such as strong winds and earthquakes.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-3
Public Resources Code Sections 5097.5 and 30244
CEQA provides guidance relative to significant impacts on paleontological resources, indicating that a project would have a significant impact on paleontological resources if it disturbs or destroys a unique paleontological resource or site, or unique geologic feature. Requirements for paleontological resource management are included in PRC, Division 5, Chapter 1.7, Section 5097.5, and Division 20, Chapter 3, Section 30244, which state:

No person shall knowingly and willfully excavate upon, or remove, destroy, injure or deface any historic or prehistoric ruins, burial grounds, archaeological or vertebrate paleontological site, including fossilized footprints, inscriptions made by human agency, or any other archaeological, paleontological or historical feature, situated on public lands, except with the express permission of the public agency having jurisdiction over such lands. Violation of this section is a misdemeanor.

These statutes prohibit the removal, without permission, of any paleontological site or feature from lands under the jurisdiction of the state or any city, county, district, authority, or public corporation, or any agency thereof. Consequently, local agencies are required to comply with PRC Section 5097.5 for their own activities, including construction and maintenance, as well as for permit actions (e.g., encroachment permits) undertaken by others. PRC Section 5097.5 also establishes the removal of paleontological resources as a misdemeanor and requires reasonable mitigation of adverse impacts to paleontological resources from developments on public (state, county, city, and district) lands.

Further, California Penal Code Section 622.5 sets the penalties for damage or removal of paleontological resources. CEQA documentation prepared for projects is required to analyze paleontological resources as a condition of the CEQA process to disclose potential impacts. As of January 2018, paleontological resources are considered in the geological rather than cultural category.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Open Space; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies in order to protect the City’s geologic resources and ensure soil stability.

Land Use Element
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

Conservation Element
CON/SOILS-P-6 Continue implementing land grading ordinances that reduce soil erosion/siltation commonly associated with land development Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-4
CON/SOILS-P-7 Land use patterns, grading, and landscaping practices shall be designed to prevent soil erosion while retaining natural watercourses when possible (l-4).

CON/SOILS-P-11 Encourage property owners to improve or preserve soil conditions CON/SOILS-P-12 Prohibit premature removal of ground cover in advance of development and require measures to prevent soil erosion during and immediately after construction
Safety Element
SAFE/GEN-G-1 To develop sustainable communities to preserve life, protect property, the environment, and the economy from natural hazards.

SAFE/GEN-P-1 The adopted Kern County, California Multi-Hazard Mitigation Plan is incorporated by reference. This multi-jurisdictional plan, approved in compliance with the Disaster Mitigation Act of 2000, provides long-term planning to reduce the impacts of future disasters.

SAFE/PS-G-1 Substantially reduce the level of death, injury, property damage, economic and social dislocation and disruption of vital services that would result from earthquake damage.

SAFE/PS-G-7 Protect land uses from the risk of dam failure inundation including the assurances that: the functional capabilities of essential facilities are available in the event of a flood; hazardous materials1 are not released; effective measures for mitigation of dam failure inundation are incorporated into the design of critical facilities; and the rapid and orderly evacuation of populations in the inundation area will occur.

SAFE/PS-P-8 Require seismic review of other potentially hazardous buildings upon any change in their use or occupancy status.

SAFE/PS-P-9 Adopt and maintain high standards for seismic performance of buildings, through prompt adoption and careful enforcement of the most current seismic standards of the Uniform Building Code.

SAFE/PS-P-10 Prohibit development designed for human occupancy within 50 feet of a known active fault and prohibit any building from being placed astride an active fault.

SAFE/PS-P-11 Require site-specific studies to locate and characterize specific fault traces within an Alquist-Priolo Earthquake Fault Zone for all construction designed for human occupancy.

SAFE/PS-P-13 Determine the liquefaction potential at sites in areas of high groundwater prior to development and determine specific mitigation to be incorporated into the foundation design, as necessary to prevent or reduce damage from liquefaction in an earthquake.

SAFE/PS-P-15 Compile information on areas of potential hazards and field information developed as part of CEQA investigations and geologic reports and keep geologic reviews and policy development current and accessible for use in report preparation.
1 Hazardous materials are defined as injurious substances, including pesticides, herbicides, toxic metals and chemicals, liquified natural gas, explosives, volatile chemicals, and nuclear fuels.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-5
Kern County Multi-Jurisdictional Hazard Mitigation Plan The Kern Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) was approved by FEMA on April 9, 2021. The Kern MJHMP provides an explanation of prevalent hazards within the County and how hazards may affect the County, participating cities and special districts differently based upon proximities to natural hazards. It also identifies risks to vulnerable assets, both people and property. The mitigation strategy presented in the Kern MJHMP responds to the identified vulnerabilities within each community and provides prescriptions or actions to achieve the greatest risk reduction based upon available resources. The County and participating jurisdictions intend to save lives, reduce injuries, reduce property damage, and protect natural resources for future generations through mitigation activities.2 The City has its own participating jurisdiction annex report that contained individually assessed hazards, explored hazard vulnerability, developed mitigation strategies, and followed the same planning process as County to create the annexes.

City of Bakersfield Municipal Code
The City of Bakersfield Municipal Code adopts the 2025 CBC in Section 15.05.010. The City’s Building Division is responsible for promoting health and safety in the construction and maintenance of buildings and structures, and the maintenance of property through the enforcement of uniform building construction codes, conservation standards, regulations, and ordinances, including the CBC and the City’s adopted policies, ordinances, and standards.

According to the Geotechnical Investigation prepared for the Project (Appendix E), the Project Site is classified as Seismic Design Category (SDC) D. Under the CBC, sites classified as SDC D require a mandatory geotechnical investigation for most new construction. The investigation must analyze slope instability, liquefaction, soil strength loss, and total/differential settlement.

4.7.2 Environmental Setting
A Geotechnical Investigation was prepared for the proposed Project by Geotechnical Professionals Inc. and is included as Appendix E, Geotechnical Investigation, of this Draft EIR.

The purpose of the Geotechnical Investigation is to provide an evaluation of the existing geotechnical conditions at the site as they relate to the design and construction of the proposed development. More specifically, this investigation was aimed at providing geotechnical recommendations for earthwork, and design of foundations.

Regional Geology
The Project Site is located within the City, which is located near the eastern edge of the broad San Joaquin Valley (Valley), at the base of the Sierra Nevada Mountain Range. The Valley is filled with thick sediments eroded from the mountains on both sides.3 Surface Conditions
The Project Site is “L” shaped with the northern property line bordering Rosedale Highway, and the eastern property line bordering Coffee Road. The eastern portion of the site is bound by a gravel-paved staging/storage area to the south and a Pacific Gas and Electric Company (PG&E) 2 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Update. Available at:
https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Volumes/Volume1.pdf. Accessed March 2026. 3 City of Bakersfield. 2002. Metropolitan Bakersfield General Plan. Available at: https://www.bakersfieldcity.us/271/Adopted-Planning-Documents. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-6
substation/Kern Power Plant to the west. The western portion of the site is bound by El Toro Viejo Road and a fast-food restaurant at the corner of El Toro Viejo Road and Rosedale Highway to the north, and the PG&E substation/Kern Power Plant to the south.

The Project Site is relatively flat with ground surface elevations ranging from about 381 feet on the western portion of the site to 390 feet in the eastern portion of the Project Site. The Project Site is predominately undeveloped with the eastern portion being used as staging/storage area, large power poles and electrical lines cross the middle of the site spanning from the PG&E substation to Rosedale Highway. The ground surface is predominately soil with some small weeds spread across the Project Site and gravel access/staging areas within the eastern portion of the site. Within the western third of the Project Site, there are five- to eight-feet-high raised access roads that appear to have been created to access oil pump jacks.

The Geotechnical Investigation included a review of aerial photographs from 1952 to present. In 1952, the Project Site was used as part of the Kern Power Plant which included large steel storage tanks, oil pump jacks, storage buildings, drives and miscellaneous structures. The majority of the structures appear to have been demolished and removed between the years 2012 and 2014.

Around the same time as the demolition, the adjacent substation appears to have been developed and some grading was performed onsite.

Subsurface Conditions
As part of the preparation of the Geotechnical Investigation, Geotechnical Professional Inc. conducted a field survey to develop a subsurface profile of limited undocumented fills zero to three feet below existing grades. The undocumented fill soils consisted of predominately slightly moist silty sands with limited clayey sands. The natural soils consist of medium dense to dense silty sands with some thin layers of sandy silts and clayey sands to depths of about 20 to 25 feet where the soils became more dense and sandier. Laboratory testing indicates the upper medium dense natural soils exhibit high strength and low compressibility and have a low susceptibility to hydro collapse. The soils within the upper five feet were predominately dry to slightly moist with an average moisture content of 5.8 percent (about one to three percent dry of optimum). Additional information on the subsurface borings is included in Appendix E, Geotechnical Investigation, of this Draft EIR.

Groundwater and Caving
Groundwater was not encountered in Geotechnical Professional Inc.’s explorations to a depth of 100 feet below existing grades. Groundwater levels in the Project Site vicinity were evaluated based on groundwater well data provided by the California Department of Water Resources (CDWR) Water Data Library at four wells each within about 0.25-miles from the Project Site in each direction. The groundwater well data readily available from these wells indicates the existing and historical high groundwater level is greater than 50 feet below existing grades. Due to the method of drilling with a hollow-stem auger, the potential for caving was very difficult to determine.

Therefore, the Geotechnical Investigation anticipates that the upper dry, sandy soils have the potential to exhibit moderate caving in open cuts and excavations.

Faulting and Seismicity
The Project Site is in a seismically active area of California and is likely to be subjected to strong ground shaking due to earthquakes on nearby faults. During the life of the Project, the Project Site will likely be subject to strong ground motions due to earthquakes on nearby faults.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-7
The CGS defines an active fault as a fault that has ruptured in the last 11,000 years.4 Based on published information, the closest active fault to the Project Site is the San Andreas fault, which is located about 34 miles from the Project Site. The nearest known fault trace and fault zone is the Kern Front Fault, a northeast trending fault, located approximately 6.13 miles northeast of the Project Site.5 The Project Site not located in an Alquist-Priolo Earthquake Fault Zone.

According to the CGS, the Project Site has not been evaluated by CGS for seismic and other geologic hazards. An area can be unevaluated for the following reasons: (1) the area is not developable for significant structures for human occupancy in the foreseeable future, (2) the area is not anticipated to experience levels of earthquake shaking high enough to generate hazards, or (3) CGS plans to delineate hazard zones in the future but has not prepared maps as of 2026.

Ground Rupture
Fault rupture is the surface displacement that occurs when movement on a fault deep within the earth breaks through to the surface. Fault rupture and displacement almost always follows preexisting faults, which are zones of weakness; however, not all earthquakes result in surface rupture (i.e., earthquakes that occur on blind thrusts do not result in surface fault rupture. Rupture may occur suddenly during an earthquake or slowly in the form of fault creep). In addition to damage caused by ground shaking from an earthquake, fault rupture is also damaging to buildings and other structures due to the differential displacement and deformation of the ground surface that occurs from the fault offset. This leads to damage or collapse of structures across this zone. Fault rupture displacements in large earthquakes can range from several feet to greater than 15 feet.

There are no known active faults crossing or projecting through the Project Site. As stated above, the Project Site is not located in an Alquist-Priolo Earthquake Fault Zone. Therefore, ground rupture at this site due to faulting is considered unlikely.

Ground Shaking
An earthquake is classified by the amount of energy released, which traditionally has been quantified using the Richter scale (ML). However, seismologists most commonly use the Moment Magnitude (MW) scale because it provides a more accurate measurement of the size of major and great earthquakes. For earthquakes of less than MW 7.0, the Moment and Richter Magnitude scales are nearly identical. For earthquake magnitudes greater than MW 7.0, readings on the Moment Magnitude scale are slightly greater than a corresponding Richter Magnitude.

The intensity of the seismic shaking, or strong ground motion, experienced at a particular location during an earthquake is dependent on the distance between that location and the epicenter of the earthquake, the magnitude of the earthquake, and the geologic conditions underlying and surrounding that location. Earthquakes occurring on faults closest to a particular site would most likely generate the largest ground motion. However, in the case of the Project Site, there are no known active or potentially active faults that cross the Project Site, including Alquist-Priolo Earthquake Fault Zones.
4 California Department of Conservation. Alquist-Priolo Earthquake Fault Zones webpage. Available at:
https://www.conservation.ca.gov/cgs/alquist-priolo#:~:text=An%20active%20fault%2C%20for%20the,in%20the%20last%2011%2C000%20years. Accessed March 2026. 5 California Department of Conservation California Geological Survey. 2026. Earthquake Zones of Required Investigation map.

Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-8
Geologic Hazards
Liquefaction
Liquefaction is the sudden loss of soil shear strength and sudden increase in porewater pressure caused by shear strains, as could result from an earthquake. Liquefaction tends to occur in loose, saturated fine-grained sands, course silts, or clays with low plasticity. The liquefaction process typically occurs at depths less than 50 feet below the ground surface, although liquefaction can occur at deeper intervals, given the right conditions. The most susceptible zone occurs at depths shallower than 30 feet below the ground surface.

For liquefaction to occur, there must be specific soil type(s), soil saturation, and cyclic accelerations of sufficient magnitude to progressively increase the water pressures within the soil mass. Non-cohesive soil shear strength is developed by the point-to-point contact of the soil grains. As the water pressures increase in the void spaces surrounding the soil grains, soil particles become supported more by water than point-to-point contact. When water pressures increase sufficiently, soil grains lose the strength to hold to each other and the soils begin to liquefy. Liquefaction can lead to several types of ground failure, depending on slope conditions and the geological and hydrological settings. The four most common types of ground failure are:
(1) lateral spreads, (2) flow failures, (3) ground oscillation, and (4) loss of bearing strength.

According to the CGS Earthquake Zones of Required Investigation map indicates that the Project Site has not been evaluated for designation as a liquefaction zone.6 However, according to the Geotechnical Investigation (Appendix E), soil liquefaction is not likely to occur at the Project Site based on the depth of the groundwater in the area.

Seismically Induced Settlement
Settlement typically occurs as a form of horizontal displacement of relatively flat-lying alluvial material toward an open or “unconfined” face such as an open body of water, channel, or excavation. In soils, this movement is generally due to a weak plane and is often associated with liquefaction. As discussed above, the Geotechnical Investigation prepared for the Project determined that soil liquefaction is not likely to occur at the Project Site.

Seismic settlement that is not related to liquefaction occurs when strong earthquake shaking results in densification of loose to medium dense sandy soils above groundwater. Based on the Geotechnical Investigation’s findings, the upper, natural, loose sandy soils on the Project Site exhibited the potential for seismic settlement.

Landslides
Landslides are gravity-driven movements of earth materials that may include rock, soil, unconsolidated sediment, or combinations of such materials. The primary factors influencing the stability of a slope are the nature of the underlying soil or bedrock, the geometry of the slope (height and steepness), and rainfall. The presence of historic landslide deposits is a good indicator of future landslides. Landslides are commonly triggered by unusually high rainfall and the resulting soil saturation, by earthquakes, or a combination of these conditions. According to the CGS Earthquake Zones of Required Investigation map, the Project Site has not been evaluated for 6 California Department of Conservation California Geological Survey. 2026. Earthquake Zones of Required Investigation map.

Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-9
designation of a landslide zone.
7 However, given that the Project Site is flat with no nearby slopes, bluffs, or steam banks, landslides are unlikely to occur on the Project Site.

Paleontological Resources
As previously discussed, a Paleontological Overview is included in Appendix E to the CRA prepared for the Project by BCR Consulting (BCR), dated February 14, 2025, and included in Appendix D, Cultural Resources Assessment, to this Draft EIR.

According to the Palaeontologic Overview, the geologic units underlying the Project Area (one-mile radius of the Project Site) are mapped primarily as alluvial fan deposits from the Holocene epoch. Holocene alluvial units are considered to be of high preservation value, but material found is unlikely to be fossil material due to the relatively modern associated dates of the deposits.

However, if development requires any substantial depth of disturbance, the likelihood of reaching Pleistocene alluvial sediments would increase. The Paleontological Overview concluded that while the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant. Excavation activity associated with the development of the Project Area is unlikely to be paleontologically sensitive, but caution during development should be observed.

4.7.3 Impact Analysis
Methodology
Potential direct and indirect Project impacts were identified based on a review of the Geotechnical Investigation (Appendix E). The Geotechnical Investigation included a review of existing documents, field exploration, laboratory testing, and engineering analysis. The field exploration program for the Project consisted of 17 Cone Penetration Tests (CPTs) and 24 exploratory borings. The CPTs were advanced to depths ranging from 30 to 100 feet below existing site grades. Laboratory soil tests were performed on selected representative samples as an aid in soil classification and to evaluate the engineering properties of the soils. The geotechnical laboratory testing program included moisture content, dry density, grain size, shear strength (direct shear), consolidation, expansion potential, collapse, compaction, R-value, and soil corrosivity and is reported in Appendix C to the Geotechnical Investigation. Engineering evaluations were performed to provide earthwork criteria, foundation and slab design parameters, preliminary pavement sections and assessments of seismic hazards. The proposed development on the Project Site would be feasible from a geotechnical standpoint, provided that applicable regulations are met.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance8to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Directly or indirectly cause potential substantial adverse effects, including the risk fo loss, injury, or death involving:
7 California Department of Conservation California Geological Survey. 2026. Earthquake Zones of Required Investigation map.

Available at: https://maps.conservation.ca.gov/cgs/informationwarehouse/eqzapp/. Accessed March 2026. 8 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-10
o Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault. Refer tp Division of Mines and Geology Special Publication 42.
o Strong seismic ground shaking.
o Seismic-related ground failure, including liquefaction. o Landslides.
• Result in substantial soil erosion or the loss of topsoil. • Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse.
• Be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial direct or indirect risks to life or property. • Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste water.
• Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature.

Project Impacts
Threshold GEO-1: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map, issued by the State Geologist for the area or based on other substantial evidence of a known fault or strong seismic ground shaking?
Impact Analysis
The closest fault to the site is the San Andreas fault, which is located about 34 miles from the Project Site. While the CGS did not evaluate the Project Site for earthquake hazard and no known faults or traces exist on the Project Site, the Project Site is located within Southern California, which is a seismically active region. Therefore, the potential for seismic ground shaking exists at the Project Site.

During the life of the Project, the Project Site will likely be subject to strong ground motions due to earthquakes on nearby faults. The Geotechnical Investigation included calculations that determined the Project Site’s peak ground acceleration (PGAM) to be 0.48g, which ultimately provides seismic design parameters specific for the Project Site based on the 2025 CBC.

The Project would be required to include seismic design in accordance with the 2025 CBC criteria.

The CPT testing conducted at the Project Site indicates that the Project would be considered Site Class D, which represents “stiff soil,” a common default classification requiring enhanced structural design for earthquake resistance. Projects in this category must follow strict lateral-force-resisting systems per ASCE 7-22 to ensure occupant safety. Design and construction of the Project would be required to adhere to the seismic safety requirements contained in the CBC, Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-11
which have been adopted by the City, as well as the applicable recommendations provided in the Geotechnical Investigation required by the City to minimize seismic-related hazards.

Moreover, the Project would not exacerbate existing environmental conditions related to seismic ground shaking at the Project Site because the Project would not involve mining operations, excavation of large areas, or the extraction or injection of oil or groundwater, which could create unstable seismic conditions that would exacerbate ground shaking.

Mandatory compliance with applicable regulatory requirements and incorporation of the recommendations included in the Geotechnical Investigation would reduce the potential for significant damage to structures resulting from strong seismic ground shaking and the exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury or death, to the maximum extent practical. Therefore, based on the above, development of the Project would not directly or indirectly cause substantial adverse effects, including risk of loss, injury, or death involving strong seismic ground shaking hazards. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold GEO-2: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure, including liquefaction? Impact Analysis
According to the Geotechnical Investigation, the Project Site is not located within a zone identified as having a potential for liquefaction by the CGS, as the quadrangle has not yet been assessed.

Therefore, based on the depth of groundwater in the area, the Geotechnical Investigation (Appendix E) determined that soil liquefaction is not likely to occur at the Project Site.

Seismic settlement that is not related to liquefaction occurs when strong earthquake shaking results in densification of loose to medium dense sandy soils above groundwater. The upper, natural, loose sandy soils encountered during the field survey of the Geotechnical Investigation exhibited the potential for seismic settlement. The Geotechnical Investigation estimated that the magnitude of induced seismic ground surface settlement is on the order of a half inch with differential settlement across 60 feet on the order of a quarter inch. As such, the Geotechnical Investigation recommends that the Project includes remedial pad grading, which with implementation, would reduce seismic settlement to less than a quarter inch. Implementation of the remedial pad grading as recommended in the Geotechnical Investigation is required by the City.

Additionally, the Project would comply with seismic design requirements included in the CBC, which is adopted by the City, in addition to the Geotechnical Investigation recommendations related to earthwork, foundations, building floor slabs, corrosions, retaining wall structures, drainage, stormwater infiltration, and external concrete, masonry, and paving. As such, potential impacts associated with exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure including liquefaction would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-12
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold GEO-3: Would the project directly or indirectly cause potential substantial adverse effects, including the risk of loss, injury, or death involving landslides?
Impact Analysis
The Project Site has not been evaluated by the CGS for susceptibility to landslides. However, the Project Site is located on relatively flat ground and is not adjacent to any areas with steep slopes that could produce a landslide in the event that ground shaking occurred at the Project Site. Due to the relatively level topography at the site, the project site and surrounding area are not susceptible to landslides. Therefore, no impact would occur.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold GEO-4: Would the project result in substantial soil erosion or the loss of topsoil?
Impact Analysis
Soil erosion occurs when surface materials are worn away from the earth’s surface due to ground disturbance and/or factors such as wind and precipitation. The potential for soil erosion is determined by characteristics including texture and content, surface roughness, vegetation cover, and slope grade and length. Wind erosion typically occurs when fine-grained non-cohesive soils are exposed to high-velocity winds, while water erosion tends to occur when loose soils on moderate to steep slopes are exposed to high-intensity storm events.

Development of the proposed would require removal and replacement soil throughout the Project Site. This would lead to limited exposure of near surface soils. Soils on the Project Site from zero to three feet below the existing grade consists of undocumented fill, comprised of predominately slightly moist silty sands with limited clayey sands, according to the Geotechnical Investigation.

Current moisture contents of the upper soils are generally below the optimum moisture content.

There is potential for erosion of these materials, depending on drainage and wind patterns.

Therefore, significant moisture conditioning (wetting) will be required as part of required adherence to the recommendations in the Geotechnical Investigation.

Development of the proposed Project would require compliance with the requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The NPDES permitting process applies to projects involving disturbance of one acre or more. These projects are required to prepare and implement a Stormwater Pollution Prevention Plan (SWPPP) that specifies how water quality would be protected during construction activities. This would include implementing best management practices (BMPs) that would reduce the potential for soil erosion. Construction Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-13
BMPs would include, but are not limited to, stabilization of construction entrances and sediment filters on existing inlets. The SWPPP and BMPs are discussed further in Section 4.10, Hydrology and Water Quality.

Upon completion of construction, the Project Site would be fully developed with large areas of impermeable surface and minimal areas of landscaping. The extensive site coverage would reduce the potential for erosion to a minimum. Consequently, operational impacts associated with soil erosion and loss of topsoil due to the Project would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold GEO-5: Would the project be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction or collapse?
Impact Analysis
The Geotechnical Investigation determined that soil liquefaction is not likely to occur at the Project Site and, due to the surface conditions of the Project Site, landslides are not expected to occur.

Regardless, the Project would comply with seismic design requirements included in the CBC, as well as the recommendations of the Geotechnical Investigation. Compliance with the requirements of the CBC and other applicable regulations and standards would reduce potential impacts associated with exposure of people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving seismic-related ground failure including liquefaction, to less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold GEO-6: Would the project be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property?
Impact Analysis
Soils that expand and contract in volume (“shrink-swell” pattern) are considered to be expansive and may cause damage to aboveground infrastructure as a result of density changes that shift overlying materials. Fine-grain clay sediments are most likely to exhibit shrink-swell patterns in response to changing moisture levels. According to the Geotechnical Investigation, granular, non-expansive soils are readily available on the Project Site. As such, there is not a geotechnical requirement for slab thickness or reinforcing based on the non-expansive characteristics of the on-site soils. Additionally, expansion index tests were performed on select bulk samples. The test was performed in accordance with ASTM D4829, to assess the expansion potential of on-site Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-14
soils. Both samples tested were well below the threshold for the expansion index, indicating that there was no expansive soil found.

However, undocumented fills were encountered to depths of predominately three feet below existing grade at the Project Site with localized deeper fills on the order of 5 to 7 feet. These fill soils are not considered to be suitable for direct support of foundations or floor slabs without remedial earthwork. For the proposed improvements included in the Project, the Geotechnical Investigation recommends the removal and recompaction of the fill and a portion of the upper low-density natural soils to provide uniform support for the planned foundations and floor slab. Any imported soils would be predominantly granular and non-expansive. Accordingly, impacts from expansive soils are less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold GEO-7: Would the project have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of waste water? Impact Analysis
No septic tanks or other alternative wastewater disposal system are proposed. Project development would include construction of all necessary on- and off-site infrastructure improvements to adequately serve the Project’s water, wastewater, and drainage needs. Water and wastewater services would be provided by the City. All proposed infrastructure and improvements would require City approval and where necessary, approval by the utility/service provider. Water and wastewater systems are further discussed in Section 4.19, Utilities and Service Systems, of this Draft EIR. No impact would occur.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact and no mitigation required.

Threshold GEO-8: Would the project directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? Impact Analysis
The proposed Project is situated in a highly disturbed environment and there are no unique geologic features located on or around the Project Site. According to the Palaeontologic Overview, the geologic units underlying the Project Area (one mile radius around the Project Site) are mapped primarily as alluvial fan deposits from the Holocene epoch. Holocene alluvial units are considered to be of high preservation value, but material found is unlikely to be fossil material due to the relatively modern associated dates of the deposits. While the presence of any fossil material is unlikely, if excavation activity disturbs deeper sediment dating to the earliest parts of the Holocene or Late Pleistocene periods, the material would be scientifically significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-15
Excavation activity associated with the development of the project area is unlikely to be paleontologically sensitive, but caution during development should be observed. However, because the Project construction would require earthwork and removal of soil, there is potential for the discovery of unknown paleontological resources. Therefore, the Project would implement Mitigation Measure (MM) GEO-1, Paleontological Discovery and Monitoring, which outlines the process for discovery of paleontological resources. With implementation of MM GEO-1, impacts would be less than significant.

Mitigation Measures
MM GEO-1 Paleontological Discovery and Monitoring. In the event paleontological resources, including fossil discoveries, are encountered during construction of the Project, work shall halt within a 50-foot radius of the find and the City shall be immediately informed of the discovery. A qualified paleontologist shall be retained by the Applicant to evaluate the find before restarting work in the area. A qualified paleontologist is a paleontologist who meets the Society of Vertebrate Paleontology (SVP) standards for Qualified Professional Paleontologist, which is defined as an individual preferably with an M.S. or Ph.D. in paleontology or geology, who is experienced with paleontological procedures and techniques, who is knowledgeable in the geology of California (preferably Southern California), and who has worked as a paleontological mitigation Project supervisor for a least one year. The City shall require that all paleontological resources identified on the Project site be assessed and treated in a manner determined by the qualified paleontologist. The qualified paleontologist shall be empowered to halt or divert ground disturbing activities.

If the discoveries are determined to be significant, full-time paleontological monitoring will be recommended for the remainder of ground disturbance for the Project. Paleontological monitoring shall entail the visual inspection of excavated or graded areas and trench sidewalls. In the event that any additional paleontological resources are discovered, the monitor shall have the authority to temporarily divert the construction equipment around the find until it is assessed for scientific significance and collected, if warranted.

Monitoring efforts can be reduced or eliminated at the discretion of the project paleontologist.

Upon completion of fieldwork, all significant fossils collected shall be prepared in a properly equipped paleontology laboratory to a point ready for curation. Following laboratory work, all fossil specimens shall be identified to the most specific taxonomic level possible, cataloged, analyzed, and first offered to the Buena Vista Museum then offered to the Natural History Museum of Los Angeles County for permanent curation and storage. At the conclusion of laboratory work and museum curation, a final Paleontological Monitoring Report (PMR) shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the Project. The report shall include a summary of the field and laboratory methods, an overview of the project area geology and paleontology, a list of taxa recovered, an analysis of fossils recovered and their scientific significance, and recommendations. A copy of the report shall also be submitted to the Buena Vista Museum in Bakersfield.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.7 Geology and Soils
City of Bakersfield – SCH No. 2025101507 4.7-16
Level of Significance After Mitigation
Less than significant with mitigation incorporated.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects in the City that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the Project in combination with the identified cumulative projects would result in significant effects to geology and soils. For purposes of this analysis, the geographic scope would be the City.

Some of the related projects identified in Table 3-1 would require excavation at depths that could potentially cause adverse effects including risk of loss, injury, or death based on strong seismic ground shaking, liquefaction, landslides and that could destroy a unique paleontological resource.

However, related projects that involve substantial excavation with the potential to expose people or structures to adverse effects of liquefaction and destroy paleontological resources are expected to adhere to the CBC, conduct a project-specific geotechnical investigation, and implement recommendations from that investigation or mitigation measures to mitigate impacts. With mandatory compliance with existing regulations and implementation of such mitigation measures, cumulative impacts from related projects are considered to be less than significant.

The Project is required to comply with the MM GEO-1, Paleontological Discovery and Monitoring, thus ensuring impacts to any paleontological resources are less than significant. Therefore, as impacts related to paleontological resources from related projects would be less than significant with implementation of mitigation measures, and as the Project would mitigate its potential impacts to paleontological resources to a less than significant level, cumulative impacts would be less than significant.

Mitigation Measures
Refer to MM GEO-1.

Level of Significance After Mitigation
Cumulative impacts related to geology and soils would be less than significant with mitigation incorporated.

City of Bakersfield – SCH No. 2025101507 4.8-1

4.8 Greenhouse Gas Emissions
This section of the Draft EIR analyzes potential greenhouse gas emissions impacts associated with the construction and operation of the proposed Project. The information in this section is summarized from the detailed greenhouse gas emissions analysis, Appendix B, Air Quality, Greenhouse Gas Emissions, and Energy Technical Study.

4.8.1 Regulatory Setting
Federal
The U.S. Environmental Protection Agency (USEPA) announced on December 7, 2009, that GHG emissions threaten the public health and welfare of the American people and that GHG emissions from on-road vehicles contribute to that threat. The USEPA’s final findings respond to the 2007 U.S. Supreme Court decision that GHG emissions fit within the Clean Air Act definition of air pollutants. The findings do not impose any emission reduction requirements, but allowed the USEPA to finalize the GHG standards proposed in 2009 for new light-duty vehicles as part of the joint rulemaking with the Department of Transportation.

To regulate GHGs from passenger vehicles, the USEPA was required to issue an endangerment finding (USEPA 2025a). The finding identified emissions of six key GHGs—CO2, CH4, N2O, hydrofluorocarbons, perfluorocarbons, and SF6—that have been the subject of scrutiny and intense analysis for decades by scientists in the United States and around the world. The first three are applicable to the Project’s GHG emissions inventory because they constitute the majority of GHG emissions and should be evaluated as part of a project’s GHG emissions inventory.

On January 20, 2025, the President of the United States signed an executive order, Unleashing American Energy, which directed the USEPA to eliminate the social cost of carbon calculation from any federal permitting or regulatory decision and submit recommendations on the legality and continued applicability of the 2009 endangerment finding, among other directives. On July 29, 2025, the USEPA released its proposal to rescind the 2009 endangerment finding and repeal all GHG emission standards for light-duty, medium-duty, and heavy-duty vehicles and engines pursuant to CAA Section 202(a). The proposed rule would remove GHG-related provisions from 40 CFR Part 600 without affecting provisions related to Corporate Average Fuel Economy (CAFE) standards and fuel economy labeling. On February 12, 2026, USEPA finalized its rescission of the 2009 Greenhouse Gas Endangerment Finding.

U.S. Mandatory Report Rule for GHGs (2009)
In response to the endangerment finding, the EPA issued the Mandatory Reporting of GHG Rule that requires substantial emitters of GHG emissions (large stationary sources, etc.) to report GHG emissions data. Facilities that emit 25,000 MTCO2e or more per year are required to submit an annual report.

Corporate Average Fuel Economy Standards
The Energy Policy and Conservation Act of 1975 was established in response to the 1973 oil crisis. The act created the Strategic Petroleum Reserve, established vehicle fuel economy standards, and prohibited the export of U.S. crude oil (with a few limited exceptions). It also created Corporate Average Fuel Economy (CAFE) standards for passenger cars starting in model Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-2
year 1978. The CAFE Standards are updated periodically to account for changes in vehicle technologies, driver behavior, and/or driving conditions.

The federal government issued new CAFE standards in 2012 for model years 2017 to 2025, which required a fleet average of 54.5 miles per gallon (mpg) in 2025. On March 30, 2020, the EPA finalized updated CAFE and greenhouse gas (GHG) emissions standards for passenger cars and light trucks and established new standards covering model years 2021 through 2026, known as the Safer Affordable Fuel Efficient (SAFE) Vehicles Final Rule for Model Years 2021 to 2026. On December 21, 2021, under direction of Executive Order 13990 issued by President Biden, the National Highway Traffic Safety Administration (NHTSA) repealed SAFE Vehicles Rule Part One, which had preempted State and local laws related to fuel economy standards. In addition, on March 31, 2022, the NHTSA finalized new fuel standards that will increase fuel efficiency 8 percent annually for model years 2024 to 2025 and 10 percent for model year 2026. Overall, the new CAFE standards require a fleet average of 49 mpg for passenger vehicles and light trucks for model year 2026, which will be a 10 mpg increase compared to model year 2021.

On June 7, 2024, the NHTSA announced final CAFE standards for passenger cars and light trucks built in model years 2027 to 2031 and final fuel efficiency standards for heavy-duty pickup trucks and vans built in model years 2030 to 2035. The final rules establish standards that would require an industry fleetwide average of approximately 50.4 mpg for passenger cars and light trucks in model year 2031, by increasing fuel economy by 2 percent year over year for passenger cars (model years 2027–2031) and for light trucks (model years 2029–2031). For heavy-duty pickup trucks and vans, the final rule would increase fuel efficiency at a rate of 10 percent per year (model years 2030–2032) and 8 percent per year (model years 2033–2035) (NHTSA 2024). However, the NHTSA released new proposed standards on December 3, 2025, under the SAFE Vehicle Rule III. The new proposed CAFE standards set a 0.5 percent increase in fuel efficiency per year for model year 2023 through 2026 passenger vehicles and light trucks. In addition, it also sets a

0.35 percent and 0.70 percent increase for model year 2027 passenger vehicles and light trucks, respectively, a 0.25 percent increase for model year 2028-2031 light duty vehicles, and a fuel economy standard of 34.5 MPG for model year 2031 light duty vehicles.

Furthermore, on June 11, 2025, the NHTSA published the final rule, “Resetting the Corporate Average Fuel Economy Program.” This interpretive rule issued by the NHTSA does not immediately change or reverse current fuel economy standards; however, the rule clarifies the NHTSA’s interpretation of its obligations for CAFE standards stemming from the Energy Policy and Conservation Act of 1975 and the Energy Independence and Security Act of 2007. The rule asserts that some regulations, such as those established under previous presidential administrations, improperly considered electric vehicles (EVs) when identifying the “maximum feasibility” average fuel economy level upon which CAFE standards are developed, thereby establishing a legal foundation for future rollbacks of CAFE standards.

Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles
In 2024, the USEPA issued a final rule, “Multi-Pollutant Emissions Standards for Model Years 2027 and Later Light-Duty and Medium-Duty Vehicles,” that sets new, more protective standards to reduce harmful air pollutant emissions from light-duty and medium-duty vehicles starting with MY 2027.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-3
State
Current State of California guidance and goals for reductions in GHG emissions are generally embodied in Executive Orders (EO) S-03-05 and B-30-15, Assembly Bill 32, Senate Bill 32, and Senate Bill 375.

Executive Order S-03-05
EO S-03-05, signed June 1, 2005, set the following GHG reduction targets for the state:
• 2000 levels by 2010
• 1990 levels by 2020
• 80 percent below 1990 levels by 2050
Assembly Bill 32, the Global Warming Solutions Act (2006) Commonly known as its legislative bill number (AB 32), this act was signed August 31, 2006, to reduce California’s contribution of GHG emissions. AB 32 follows the 2020 tier of emissions-reduction targets established in EO S-03-05. The California Air Resources Board (CARB) prepared the 2008 Scoping Plan to outline a plan to achieve the GHG emissions reduction targets of AB 32.

Executive Order B-30-15
EO B-30-15, signed April 29, 2015, set a goal of reducing GHG emissions within the state to 40 percent of 1990 levels by year 2030. EO B-30-15 also directed CARB to update the Scoping Plan to quantify the 2030 GHG reduction goal for the state and required state agencies to implement measures to meet the interim 2030 goal, as well as the long-term goal for 2050 in EO S-03-05. It required the California Natural Resources Agency to conduct triennial updates of the California adaption strategy, “Safeguarding California,” to ensure climate change is accounted for in state planning and investment decisions.

Senate Bill 32 and Assembly Bill 197
In September 2016, Governor Brown signed Senate Bill 32 and Assembly Bill 197, making the Executive Order goal for year 2030 into a statewide, mandated legislative target. AB 197 established a joint legislative committee on climate change policies and requires CARB to prioritize direct emissions reductions rather than the market-based cap-and-trade program for large stationary, mobile, and other sources.

Executive Order B-55-18
EO B-55-18, signed September 10, 2018, sets a goal “to achieve carbon neutrality as soon as possible, and no later than 2045, and achieve and maintain net negative emissions thereafter.” EO B-55-18 directs CARB to work with relevant state agencies to ensure future Scoping Plans identify and recommend measures to achieve the carbon neutrality goal. The goal of carbon neutrality by 2045 is in addition to other statewide goals, meaning not only should emissions be reduced to 80 percent below 1990 levels by 2050, but that, by no later than 2045, the remaining emissions should be offset by equivalent net removals of CO2e from the atmosphere, including through sequestration in forests, soils, and other natural landscapes.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-4
Assembly Bill 1279
On August 31, 2022, the California Legislature passed AB 1279, which requires California to achieve net-zero GHG emissions no later than 2045 and to achieve and maintain negative GHG emissions thereafter. Additionally, AB 1279 also establishes a GHG emissions reduction goal of 85 percent below 1990 levels by 2045. CARB will be required to update the Scoping Plan to identify and recommend measures to achieve the net-zero and GHG emissions-reduction goals. 2022 Scoping Plan Update
CARB adopted the 2022 Scoping Plan for Achieving Carbon Neutrality (2022 Scoping Plan) on December 15, 2022, which lays out a path to achieve carbon neutrality by 2045 or earlier and to reduce the state’s anthropogenic GHG emissions (CARB 2022). The Scoping Plan was updated to address the carbon neutrality goals of EO B-55-18 (discussed below) and the ambitious GHG reduction target as directed by AB 1279. Previous Scoping Plans focused on specific GHG reduction targets for our industrial, energy, and transportation sectors—to meet 1990 levels by 2020, and then the more aggressive 40 percent below that for the 2030 target. The 2022 Scoping Plan expands upon earlier Scoping Plans with a target of reducing anthropogenic emissions to 85 percent below 1990 levels by 2045. Carbon neutrality takes it one step further by expanding actions to capture and store carbon, including through natural and working lands and mechanical technologies, while drastically reducing anthropogenic sources of carbon pollution at the same time.

The path forward was informed by the recent Sixth Assessment Report (AR6) of the Intergovernmental Panel on Climate Change (IPCC), and the measures would achieve 85 percent below 1990 levels by 2045 in accordance with AB 1279.

For residential and mixed-use development projects, CARB recommends this first approach to demonstrate that these land use development projects are aligned with state climate goals based on the attributes of land use development that reduce operational GHG emissions while simultaneously advancing fair housing. Attributes that accommodate growth in a manner consistent with the GHG and equity goals of SB 32 have all the following attributes:
▪ Transportation Electrification
• Provide EV charging infrastructure that, at a minimum, meets the most ambitious voluntary standards in the California Green Building Standards Code at the time of project approval. ▪ VMT Reduction
• Is located on infill sites that are surrounded by existing urban uses and reuses or redevelops previously undeveloped or underutilized land that is presently served by existing utilities and essential public services (e.g., transit, streets, water, sewer). • Does not result in the loss or conversion of the State’s natural and working lands. • Consists of transit-supportive densities (minimum of 20 residential dwelling units/acre) or is in proximity to existing transit stops (within a half mile) or satisfies more detailed and stringent criteria specified in the region’s Sustainable Communities Strategy (SCS). • Reduces parking requirements by:
▪ Eliminating parking requirements or including maximum allowable parking ratios (i.e., the ratio of parking spaces to residential units or square feet); or ▪ Providing residential parking supply at a ratio of <1 parking space per dwelling unit; or Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-5
▪ For multifamily residential development, requiring parking costs to be unbundled from costs to rent or own a residential unit.
• At least 20 percent of the units are affordable to lower-income residents; • Result in no net loss of existing affordable units.
▪ Building Decarbonization
• Use all electric appliances without any natural gas connections and does not use propane or other fossil fuels for space heating, water heating, or indoor cooking (CARB 2022).

The second approach to project-level alignment with state climate goals is net zero GHG emissions, especially for new residential projects. The third approach to demonstrating project-level alignment with state climate goals is to align with GHG thresholds of significance, which many local air quality management and air pollution control districts have developed or adopted.

Senate Bill 375
In 2008, SB 375, the Sustainable Communities and Climate Protection Act, was adopted to connect the GHG emissions reductions targets established in the 2008 Scoping Plan for the transportation sector to local land use decisions that affect travel behavior. Its intent is to reduce GHG emissions from light-duty trucks and automobiles (excludes emissions associated with goods movement) by aligning regional long-range transportation plans, investments, and housing allocations to local land use planning to reduce VMT and vehicle trips. Specifically, SB 375 required CARB to establish GHG emissions reduction targets for each of the 18 metropolitan planning organizations (MPO). The Kern Council of Governments (Kern COG) is the MPO for the County of Kern (County) and its 11 incorporated cities, including Bakersfield.

Pursuant to the recommendations of the Regional Transportation Advisory Committee, CARB adopted per capita reduction targets for each of the MPOs rather than a total magnitude reduction target. CARB is required to update the targets for the MPOs every eight years. In June 2017, CARB released updated targets and technical methodology, and then released another update in February 2018, which became effective in October 2018. CARB staff began the target update process in 2024 with a public workshop and plans to conclude it in 2026 with Board approval of the new targets.

The updated targets consider the need to further reduce VMT, as identified in the 2017 Scoping Plan Update, while balancing the need for additional and more flexible revenue sources to incentivize positive planning and action toward sustainable communities. The updated SB 375 targets are in units of percent per capita reduction in GHG emissions from automobiles and light trucks compared to 2005. This excludes reductions anticipated from implementation of State technology and fuels strategies and any potential future State strategies such as statewide road user pricing. The updated targets call for greater per-capita GHG emission reductions from SB 375 than were currently in place, which for 2035 translates into updated targets that either match or exceed the emission reduction levels in the MPOs’ currently adopted SCSs. CARB’s updated targets result in an additional reduction of over 8 MMTCO2e in 2035 compared to the prior targets.

Kern COG’s Regional Transportation Plan/Sustainable Communities Strategy The Kern COG 2022 Regional Transportation Plan/Sustainable Communities Strategy (2022 RTP/SCS), which covers a 24-year period, is the latest adopted RTP/SCS and integrates transportation, land use, and housing in the planning process. The 2022 RTP/SCS provides the foundation for transportation decisions by local, regional, and state officials; documents the Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-6
region’s mobility needs and issues; identifies and attempts to resolve regional issues and provide policy and direction for local transportation plans; documents the region’s goals, policies, and objectives for meeting current and future transportation mobility needs; defines an action plan to address transportation issues and needs, consistent with regional and state policies; identifies transportation improvements in sufficient detail to aid in the development of the state transportation improvement program and to be useful in making decisions related to the development and growth of the region; identifies the agencies responsible for implementing action plans; and documents the region’s financial resources needed to meet mobility needs. Overall, the 2022 RTP/SCS identifies that the Kern COG region will meet its per capita targets for both 2020 and 2035 at 9 percent and 15 percent, respectively. The Kern COG is currently preparing the 2026 RTP/SCS, which would replace the 2022 RTP/SCS once adopted.

Transportation Sector–Specific Regulations
Assembly Bill 1493
California vehicle GHG emission standards were enacted under AB 1493 (Pavley I). Pavley I is a clean-car standard that reduces GHG emissions from new passenger vehicles (light-duty auto to medium-duty vehicles) from 2009 through 2016 and is anticipated to reduce GHG emissions from new passenger vehicles by 30 percent in 2016. California implements the Pavley I standards through a waiver granted to California by the EPA. In January 2012, CARB approved the Advanced Clean Cars program (formerly known as Pavley II) for model years 2017 through 2025.

The program combines the control of smog, soot, and global warming gases with requirements for greater numbers of zero emission (ZE) vehicles into a single package of standards. Under California’s Advanced Clean Car program, by 2025 new automobiles will emit 34 percent less global warming gases and 75 percent less smog-forming emissions.

Executive Order S-01-07
On January 18, 2007, the state set a new low-carbon fuel standard (LCFS) for transportation fuels sold in the state. EO S-01-07 sets a declining standard for GHG emissions measured in CO2e gram per unit of fuel energy sold in California. The LCFS required a reduction of 2.5 percent in the carbon intensity of California’s transportation fuels by 2015 and a reduction of at least 10 percent by 2020. In 2018, the LCFS was amended to include a year 2030 reduction goal of at least 20 percent in the carbon intensity of transportation fuels. The standard applies to refiners, blenders, producers, and importers of transportation fuels and would use market-based mechanisms to allow these providers to choose how they reduce emissions during the “fuel cycle” using the most economically feasible methods.

Executive Order B-16-2012
On March 23, 2012, the State announced that CARB, the California Energy Commission (CEC), the Public Utilities Commission, and other relevant agencies worked with the Plug-in Electric Vehicle Collaborative and the California Fuel Cell Partnership to establish benchmarks to accommodate ZE vehicles in major metropolitan areas, including infrastructure to support them (e.g., electric vehicle charging stations). The EO directed an increase in the number of ZE vehicles in California’s state fleet through the normal course of fleet replacement so that at least 10 percent of fleet purchases of light-duty vehicles would be ZE by 2015 and at least 25 percent by 2020.

The EO also established a target for the transportation sector of reducing GHG emissions to 80 percent below 1990 levels.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-7
Executive Order N-79-20
On September 23, 2020, Governor Newsom signed EO N-79-20, which sets a course to end sales of internal combustion passenger vehicles. EO N-79-20 set a statewide goal that 100 percent of in-state sales of new passenger cars and trucks will be ZE by 2035. Additionally, the fleet goals for trucks are that 100 percent of drayage trucks be ZE by 2035 and 100 percent of medium- and heavy-duty vehicles in the state be ZE by 2045, where feasible. EO N-79-20 also identifies a goal for the state to transition to 100 percent ZE off-road vehicles and equipment by 2035, where feasible. Advanced Clean Cars II (ACC II) approved by CARB on August 25, 2022, codified the zero-emission vehicle transition goal established under EO-N-79-20 and set low-emission and zero-emission vehicle standards for model year 2026 through 2035 vehicles. However, on May 22, 2025, the U.S. Senate voted to revoke the waiver granted by the Biden administration for the ACC II program through congressional resolution. On June 12, 2025, President Trump signed the resolution, which formally nullified ACC II. Currently, implementation of ACC II is unknown.

Renewables Portfolio: Carbon Neutrality Regulations
Senate Bills 1078, 107, and X1-2 and Executive Order S-14-08 A major component of California’s Renewable Energy Program is the renewables portfolio standard (RPS) established under Senate Bills 1078 (Sher) and 107 (Simitian). Under the RPS, certain retail sellers of electricity were required to increase the amount of renewable energy each year by at least 1 percent and to reach at least 20 percent by December 30, 2010. EO S-14-08, signed in November 2008, expanded the State’s renewable energy standard to 33 percent renewable power by 2020. This standard was adopted by the legislature in 2011 (SB X1-2).

Renewable sources of electricity include wind, small hydropower, solar, geothermal, biomass, and biogas. The increase in renewable sources for electricity production will decrease indirect GHG emissions from development projects because electricity production from renewable sources is generally considered carbon neutral.

Senate Bill 350
Senate Bill 350 (De Leon), was signed into law in September 2015. SB 350 establishes tiered increases to the RPS of 40 percent by 2024, 45 percent by 2027, and 50 percent by 2030. SB 350 also set a new goal to double the energy efficiency savings in electricity and natural gas through energy efficiency and conservation measures.

Senate Bill 100
On September 10, 2018, Governor Brown signed SB 100, which replaced the SB 350 requirement of 45 percent renewable energy by 2027 with the requirement of 50 percent by 2026 and raises California’s RPS requirements for 2030 from 50 percent to 60 percent. SB 100 also sets RPS requirements for publicly owned utilities to consist of 44 percent renewable energy by 2024, 52 percent by 2027, and 60 percent by 2030. The bill establishes an overall state policy that eligible renewable energy resources and zero-carbon resources supply 100 percent of all retail sales of electricity to California end-use customers and 100 percent of electricity procured to serve all state agencies by December 31, 2045. Under the bill, the state cannot increase carbon emissions elsewhere in the western grid or allow resource shuffling to achieve the 100 percent carbon-free electricity target.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-8
Senate Bill 1020
SB 1020 was signed into law on September 16, 2022. It requires renewable energy and zero-carbon resources to supply 90 percent of all retail electricity sales by 2035 and 95 percent by 2040. Additionally, SB 1020 requires all state agencies to procure 100 percent of electricity from renewable energy and zero-carbon resources by 2035.

Energy Efficiency Regulations
California Building Code: Building Energy Efficiency Standards Energy conservation standards for new residential and nonresidential buildings were adopted by the California Energy Resources Conservation and Development Commission (now the CEC) in June 1977 (24 California Code of Regulations [CCR] Part 6). Part 6 requires the design of building shells and building components to conserve energy. The standards are updated periodically to allow for consideration and possible incorporation of new energy-efficiency technologies and methods.

The 2022 Building Energy Efficiency Standards were adopted on August 11, 2021, and went into effect on January 1, 2023. The 2022 standards encourage efficient electric heat pumps, establish electric-ready requirements for new homes, expand solar photovoltaic (PV) and battery storage standards, strengthen ventilation standards, and more. The 2022 standards require mixed-fuel single-family homes to be electric-ready to accommodate replacement of gas appliances with electric appliances. In addition, the standards also include prescriptive PV system and battery requirements for high-rise, multifamily buildings (i.e., more than three stories) and noncommercial buildings such as hotels, offices, medical offices, restaurants, retail stores, schools, warehouses, theaters, and convention centers. The 2025 Building Energy Efficiency Standards were adopted September 24, 2024, and became effective and replaced the 2022 Building Energy Efficiency Standards on January 1, 2026. Updates under the 2025 Building Energy Efficiency Standards include electric-ready requirements for some multi-family buildings and commercial kitchens and solar and battery energy storage requirements for assembly buildings including religious worship, sports, and recreational buildings.

Under the prescriptive pathway, a new development’s building design is considered the “Standard Design Building,” which represents the energy-efficiency performance of that project should it include all prescribed features (e.g., solar, battery storage) with no additional energy-efficiency features beyond what is required at minimum under the mandatory requirements and prescriptive pathway. A project may still demonstrate compliance using the performance pathway without inclusion of prescriptive features like solar or battery storage. However, that building design must match or exceed the energy efficiency performance of the Standard Design Building. For example, if a project would be required to include solar and battery storage under the prescriptive pathway, it can choose to comply with the performance pathway and not include solar and battery storage so long as it can demonstrate that it would achieve the same energy-efficiency performance as if solar and battery storage were included.

California Building Code: CALGreen
On July 17, 2008, the California Building Standards Commission adopted the nation’s first green building standards. The California Green Building Standards Code (24 CCR, Part 11), or “CALGreen,” was adopted as part of the California Building Standards Code. CALGreen established planning and design standards for sustainable site development, energy efficiency (in excess of the California Energy Code requirements), water conservation, material conservation, Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-9
and internal air contaminants.1 The mandatory provisions of CALGreen became effective January 1, 2011, and were last updated in 2025. The 2025 CALGreen standards became effective January 1, 2026.

Section 5.408 of CALGreen also requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.
2006 Appliance Efficiency Regulations
The 2006 Appliance Efficiency Regulations (20 CCR Sections 1601–1608) were adopted by the CEC on October 11, 2006, and approved by the California Office of Administrative Law on December 14, 2006. The regulations include standards for both federally regulated appliances and non–federally regulated appliances. Though these regulations are now often viewed as “business as usual,” they exceed the standards imposed by all other states, and they reduce GHG emissions by reducing energy demand.

Solid Waste Regulations
AB 939, Integrated Waste Management Act of 1989
California’s Integrated Waste Management Act of 1989 (AB 939) set a requirement for cities and counties throughout the state to divert 50 percent of all solid waste from landfills by January 1, 2000, through source reduction, recycling, and composting (Public Resources Code Sections 40050 et seq.). In 2008, the requirements were modified to reflect a per capita requirement rather than tonnage. To help achieve this, the act requires that each city and county prepare and submit a source reduction and recycling element. AB 939 also established the goal for all California counties to provide at least 15 years of ongoing landfill capacity.

AB 341
AB 341 (Chapter 476, Statutes of 2011) increased the statewide goal for waste diversion to 75 percent by 2020 and required recycling of waste from commercial and multifamily residential land uses.

AB 1327
AB 1327, the California Solid Waste Reuse and Recycling Access Act, requires areas to be set aside for collecting and loading recyclable materials in development projects (Public Resources Code Sections 42900 et seq.). The act required the California Integrated Waste Management Board to develop a model ordinance for adoption by any local agency requiring adequate areas for collection and loading of recyclable materials as part of development projects. Local agencies are required to adopt the model or an ordinance of their own.

AB 1826
In October 2014, Governor Brown signed AB 1826, requiring businesses to recycle their organic waste on and after April 1, 2016, depending on the amount of waste they generate per week. This law also required that on and after January 1, 2016, local jurisdictions across the state implement an organic waste recycling program to divert organic waste generated by businesses and multifamily residential dwellings that consist of five or more units. Organic waste means food 1 The green building standards became mandatory in the 2010 edition of the code.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-10
waste, green waste, landscape and pruning waste, nonhazardous wood waste, and food-soiled paper waste that is mixed in with food waste.

Water Efficiency Regulations
SBX7-7
The 20x2020 Water Conservation Plan was issued by the Department of Water Resources (DWR) in 2010 pursuant to Senate Bill 7, which was adopted during the 7th Extraordinary Session of 2009–2010 and therefore dubbed “SBX7-7.” SBX7-7 mandated urban water conservation and authorized the DWR to prepare a plan implementing urban water conservation requirements (20x2020 Water Conservation Plan). In addition, it required agricultural water providers to prepare agricultural water management plans, measure water deliveries to customers, and implement other efficiency measures. SBX7-7 required urban water providers to adopt a water conservation target of 20 percent reduction in urban per capita water use by 2020 compared to 2005 baseline use.

AB 1881
The Water Conservation in Landscaping Act of 2006 requires local agencies to adopt the updated DWR model ordinance or an equivalent. AB 1881 also requires the CEC to consult with the DWR to adopt, by regulation, performance standards and labeling requirements for landscape irrigation equipment, including irrigation controllers, moisture sensors, emission devices, and valves to reduce the wasteful, uneconomic, inefficient, or unnecessary consumption of energy or water.

Short-Lived Climate Pollutant Strategy Reduction
Senate Bill 1383
On September 19, 2016, the Governor signed SB 1383 to supplement the GHG reduction strategies in the Scoping Plan to consider short-lived climate pollutants, including black carbon and methane. Black carbon is the light-absorbing component of fine particulate matter produced during incomplete combustion of fuels. SB 1383 required the state board, no later than January 1, 2018, to approve and begin implementing a comprehensive strategy to reduce emissions of short-lived climate pollutants to achieve a reduction in methane by 40 percent, hydrofluorocarbon gases by 40 percent, and anthropogenic black carbon by 50 percent below 2013 levels by 2030, as specified. The bill also establishes targets for reducing organic waste in landfills. On March 14, 2017, CARB adopted the “Final Proposed Short-Lived Climate Pollutant Reduction Strategy,” which identifies the State’s approach to reducing anthropogenic and biogenic sources of short-lived climate pollutants. Anthropogenic sources of black carbon include on- and off-road transportation, residential wood burning, fuel combustion (charbroiling), and industrial processes.

According to CARB, ambient levels of black carbon in California are 90 percent lower than in the early 1960s despite the tripling of diesel fuel use (CARB 2017a). In-use on-road rules are to reduce black carbon emissions from on-road sources by 80 percent between 2000 and 2020.

Local
City of Bakersfield Metropolitan Bakersfield General Plan.

The City’s Conservation Element of the Metropolitan Bakersfield General Plan (General Plan) has identified the following goals, objectives, and policies aimed at reducing greenhouse gas emissions in the development of the City under the General Plan. Applicable GHG emission reducing goals and policies from the General Plan’s Conservation Element are listed below:

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-11
Goals
• Reduce the amount of vehicular emissions in the planning area.

Policies
• Implement the Transportation System Management Program (July 1984) for Metropolitan Bakersfield to improve traffic flow, reduce vehicle trips, and increase street capacity. • Encourage the use of mass transit, carpooling, and other transportation options to reduce vehicle miles traveled.
• Promote the use of bicycles by providing attractive bicycle paths and requiring provision of storage facilities in commercial and industrial projects. • Cooperate with Golden Empire Transit and Kern Regional Transit to provide a comprehensive mass transit system for Bakersfield; require large-scale new development to provide related improvements, such as bus stop shelters and turnouts. • Encourage walking for short-distance trips through the creation of pedestrian-friendly sidewalks and street crossings.
• Encourage the use of alternative fuel and low or zero-emission vehicles (I-5, I-6).

4.8.2 Environmental Setting
Climate Change Setting
Scientists have concluded that human activities are contributing to global climate change by adding large amounts of heat-trapping gases, known as GHGs, to the atmosphere. The primary source of these GHGs is fossil fuel use. The IPCC) has identified four major GHGs—water vapor, carbon dioxide (CO2), methane (CH4), and ozone (O3)—that are the likely cause of an increase in global average temperatures observed in the 20th and 21st centuries. Other GHGs identified by the IPCC that contribute to global warming to a lesser extent are nitrous oxide (N2O), sulfur hexafluoride (SF6), hydrofluorocarbons, perfluorocarbons, and chlorofluorocarbons (IPCC 2001).2,3 The major GHGs are briefly described below.
• Carbon dioxide (CO2) enters the atmosphere through the burning of fossil fuels (oil, natural gas, and coal), solid waste, trees and wood products, and respiration, and also as a result of other chemical reactions (e.g., manufacture of cement). Carbon dioxide is removed from the atmosphere (sequestered) when it is absorbed by plants as part of the biological carbon cycle.
• Methane (CH4) is emitted during the production and transport of coal, natural gas, and oil.

Methane emissions also result from livestock and other agricultural practices and from the decay of organic waste in municipal landfills and water treatment facilities. 2 Water vapor (H2O) is the strongest GHG and the most variable in its phases (vapor, cloud droplets, ice crystals). However, water vapor is not considered a pollutant, because it is considered part of the feedback loop rather than a primary cause of change. 3 Black carbon contributes to climate change both directly, by absorbing sunlight, and indirectly, by depositing on snow (making it melt faster) and by interacting with clouds and affecting cloud formation. Black carbon is the most strongly light-absorbing component of particulate matter emitted from burning fuels such as coal, diesel, and biomass. Reducing black carbon emissions globally can have immediate economic, climate, and public health benefits. California has been an international leader in reducing emissions of black carbon, with close to 95 percent control expected by 2020 due to existing programs that target reducing particulate matter from diesel engines and burning activities (CARB 2017a). However, state and national GHG inventories do not include black carbon yet due to ongoing work resolving the precise global warming potential of black carbon. Guidance for CEQA documents does not yet include black carbon.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-12
• Nitrous oxide (N2O) is emitted during agricultural and industrial activities as well as during the combustion of fossil fuels and solid waste.

GHGs are dependent on the lifetime, or persistence, of the gas molecule in the atmosphere. Some GHGs have a stronger greenhouse effect than others. These are referred to as high global warming potential (GWP) gases. The GWP of GHG emissions are shown in Table 4.8-1, GHG Emissions and Their Relative Global Warming Potential Compared to CO2. The GWP is used to convert GHGs to CO2-equivalence (CO2e) to show the relative potential that different GHGs have to retain infrared radiation in the atmosphere and contribute to the greenhouse effect. For example, under IPCC’s Fifth Assessment Report (AR5), GWP values for CH4, 10 metric tons (MT) of CH4 would be equivalent to 280 MT of CO2.

Table 4.8-1 -GHG Emissions and Their Relative Global Warming Potential Compared to CO2
GHGs Carbon Dioxide (CO2) Methane1(CH4) Nitrous Oxide (N2O) Fourth Assessment
Global Warming Potential Relative to
CO2
2 1 25 298
Fifth Assessment
Global Warming Potential Relative to
CO2
2 1 28 265
Sixth Assessment
Global Warming Potential Relative to
CO2
2 1 30 273
Source: IPCC 2007, 2013, and 2023.

Notes: The IPCC published updated GWP values in its Sixth Assessment Report (AR6) that reflect latest information on atmospheric lifetimes of GHGs and an improved calculation of the radiative forcing of CO2. However, GWP values identified in AR5 are used by the 2022 Scoping Plan for long-term emissions forecasting.
1 The methane GWP includes direct effects and indirect effects due to the production of tropospheric ozone and stratospheric water vapor. The indirect effect due to the production of CO2 is not included.
2 Based on 100 year time horizon of the GWP of the air pollutant compared to CO2.

California’s Greenhouse Gas Sources and Relative Contribution In 2025, the statewide GHG emissions inventory was updated for 2000 to 2023 emissions using the GWPs in IPCC’s AR4 and reported that California produced 360.4 MMTCO2e GHG emissions in 2023 (3.0 percent lower than 2022 levels). Since peak levels in 2004, California’s GHG emissions have generally followed a decreasing trend. By 2014, statewide GHG emissions dropped below the 2020 GHG limit (AB 32 target for year 2020) and have remained below that limit ever since. Additionally, the carbon intensity of California’s economy (the amount of carbon pollution per million dollars of gross state product) is declining.

California’s transportation sector remains the largest source of GHG emissions, producing

37.1 percent of the state’s total emissions. Industrial sector emissions make up 18.6 percent, and electric power generation make up 15.9 percent of the state’s emissions inventory. Other major sectors of GHG emissions include residential and commercial (12.0 percent), agriculture and forestry (8.1 percent), high GWP emissions (5.9 percent), and recycling and waste (2.4 percent).

Emissions from the transportation sector (e.g., on-road vehicles) have generally decreased since their peak in 2002, but this sector has experienced periods of growth and decline. A decrease through 2023 was primarily due to reductions from on-road sources, likely from an increased use in EVs and more fuel-efficient vehicles over that timeframe, and the subsequent decrease in the Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-13
amount of fuel used. Electricity emissions also have decreased since the early 2000s due to the deployment of renewable and less carbon-intensive resources, leading to reduced dependence on fossil-fuel electricity generation. Emissions from the industrial sector decreased from 2022, largely due to the continued downward trend in oil and gas production.

Human Influence on Climate Change
For approximately 1,000 years before the Industrial Revolution, the amount of GHGs in the atmosphere remained relatively constant. During the 20th century, however, scientists observed a rapid change in the climate and the quantity of climate change pollutants in the Earth’s atmosphere that is attributable to human activities.

The recent IPCC Sixth Assessment Report (AR6) summarizes the latest scientific consensus on climate change. It finds that atmospheric concentrations of CO2 have increased by 50 percent since the Industrial Revolution and continue to increase at a rate of two parts per million each year. By the 2030s, and no later than 2040, the world will exceed 1.5°C warming. These recent changes in the quantity and concentration of climate change pollutants far exceed the extremes of the ice ages, and the global mean temperature is warming at a rate that cannot be explained by natural causes alone. Human activities are directly altering the chemical composition of the atmosphere through the buildup of climate change pollutants. In the past, gradual changes in the Earth’s temperature changed the distribution of species, availability of water, and other conditions.

Human activities are accelerating this process so that environmental impacts associated with climate change no longer occur in a geologic time frame but within a human lifetime.

Like the variability in the projections of the expected increase in global surface temperatures, the environmental consequences of gradual changes in the Earth’s temperature are hard to predict.

Projections of climate change depend heavily upon future human activity. Therefore, climate models are based on different emission scenarios that account for historical trends in emissions and on observations of the climate record that assess the human influence of the trend and projections for extreme weather events. Climate-change scenarios are affected by varying degrees of uncertainty. For example, there are varying degrees of certainty on the magnitude of the trends for:
• Warmer and fewer cold days and nights over most land areas. • Warmer and more frequent hot days and nights over most land areas. • An increase in frequency of warm spells/heat waves over most land areas. • An increase in frequency of heavy precipitation events (or proportion of total rainfall from heavy falls) over most areas.
• Larger areas affected by drought.
• Intense tropical cyclone activity increases.
• Increased incidence of extreme high sea level (excluding tsunamis).

Potential Climate Change Impacts for California
There is at least a greater than 50 percent likelihood that global warming will reach or exceed

1.5°C in the near-term, even for the very low GHG emissions scenario (IPCC 2022). Climate change is already impacting California and will continue to affect it for the foreseeable future. For example, the average temperature in most areas of California is already 1°F (~0.56°C) higher than historical levels, and some areas have seen average increases in excess of 2°F (~1.1°C).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-14
The California Fourth Climate Change Assessment identifies the following climate change impacts under a business-as-usual scenario, in which no new actions are taken to curb GHG emissions:
• Annual average daily high temperatures in California are expected to rise by 2.7°F by 2040, 5.8°F by 2070, and 8.8°F by 2100 compared to observed and modeled historical conditions. These changes are statewide averages. Heat waves are projected to become longer, more intense, and more frequent.
• Warming temperatures are expected to increase soil moisture loss and lead to drier seasonal conditions. Summer dryness may become prolonged, with soil drying beginning earlier in the spring and lasting longer into the fall and winter rainy season. • High heat increases the risk of death from cardiovascular, respiratory, cerebrovascular, and other diseases.
• Droughts are likely to become more frequent and persistent through 2100.4 • Climate change is projected to increase the strength of the most intense precipitation and storm events affecting California.
• Mountain ranges in California are already seeing a reduction in the percentage of precipitation falling as snow. Snowpack levels are projected to decline significantly by 2100 due to reduced snowfall and faster snowmelt.
• Marine layer clouds are projected to decrease, though more research is needed to better understand their sensitivity to climate change.
• Extreme wildfires (i.e., fires larger than 10,000 hectares or 24,710 acres) would occur 50 percent more frequently. The maximum area burned statewide may increase 178 percent by the end of the century.
• Exposure to wildfire smoke is linked to increased incidence of respiratory illness. • Sea level rise is expected to continue to increase erosion of beaches, cliffs, and bluffs. (CalOES 2020)
Global climate change risks to California include impacts to public health, water resources, agriculture, coastal sea level, forest and biological resources, and energy.

The issue of global climate change is, by definition, a cumulative environmental impact. The San Joaquin Valley Air Pollution Control District (SJVAPCD) adopted Guidance Methodology for addressing GHG emissions under CEQA on December 17, 2009 (SJVAPCD 2009b). In addition, SJVAPCD adopted a Climate Change Action Plan to identify strategies to reduce GHG emissions in the San Joaquin Valley Air Basin. SJVAPCD’s methodology includes a tiered approach:
• If a project is exempt from CEQA, individual-level and cumulative GHG emissions are treated as less than significant.
• If the project complies with a GHG emissions reduction plan or mitigation programs that avoid or substantially reduce GHG emissions in the geographic area where the project is located (i.e., city or county), individual-level and cumulative GHG emissions are treated as less than significant.
• SJVAPCD does not have thresholds of significance for construction-related GHG emissions. Construction emissions are one-time, nonrecurring emissions. For buildings in 4 Overall, California has become drier over time, with five of the eight years of severe to extreme drought occurring between 2007 and 2016, and with unprecedented dry years in 2014 and 2015 (OEHHA 2018). Statewide precipitation has become increasingly variable from year to year, with the driest consecutive four years occurring from 2012 to 2015 (OEHHA 2018).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-15
general, it is reasonable to look at a 30-year time frame, since this is a typical interval before a new building requires its first major renovation. Therefore, construction emissions are amortized over a 30-year duration and included in the operational emissions analysis.

SJVAPCD’s methodology for evaluating GHG emissions impacts also includes methodology to evaluate whether a project would comply with AB 32 by conducting an analysis of whether the project would reduce GHG emissions by 29 percent from business as usual through implementation of “best performance standards.” The November 30, 2015, Center for Biological Diversity v. California Department of Fish and Wildlife (62 Cal.4th 204) ruling effectively limits use of this performance metric. The 29 percent below business as usual established in the CARB Scoping Plan is derived from the statewide reduction target set by AB 32 for year 2020. The court held that the 29 percent is the statewide goal, but there is no substantial evidence that establishes a nexus between the statewide goal and the percentage reduction a specific land use project would need to achieve to be consistent with the goals of AB 32. Projects must determine the reduction target specific to the land use type being proposed.

Because SJVAPCD’s significance criteria do not establish a nexus that connects the statewide GHG emissions reductions identified in the Scoping Plan to reductions needed for new development projects, an alternate approach to use of the performance metric is utilized until SJVAPCD revises their Guidance Methodology to address the Newhall Ranch ruling. For purposes of this analysis, the Project is evaluated to a net zero threshold to determine potential GHG emissions impacts. While this net zero threshold approach is conservative, it aligns with the State’s carbon neutrality goal under AB 1279. Use of this threshold does not require the Project to independently achieve net-zero operational emissions where all feasible mitigation has been incorporated, and the City adopts appropriate CEQA findings.

Mass Emissions and Health Effects
On December 24, 2018, in Sierra Club et al. v. County of Fresno et al. (6 Cal. 5th 502) (Friant Ranch), the California Supreme Court determined that the EIR for the proposed Friant Ranch project failed to adequately analyze the project’s air quality impacts on human health. The EIR prepared for the project, which involved a master planned retirement community in Fresno County, showed that project-related mass emissions would exceed the SJVAPCD’s regional significance thresholds. In its findings, the California Supreme Court affirmed the holding of the Court of Appeals that EIRs for projects must not only identify impacts to human health but provide an “analysis of the correlation between the project's emissions and human health impacts” related to each criteria air pollutant that exceeds the regional significance thresholds or explain why it could not make such a connection. In general, the ruling focuses on the correlation of emissions of toxic air contaminants and criteria air pollutants and their impact to human health.

In 2009, the EPA issued an endangerment finding for six GHGs (CO2, CH4, N2O, HFCs, PFCs, and SF6) in order to regulate GHG emissions from passenger vehicles. The endangerment finding is based on evidence that shows an increase in mortality and morbidity associated with increases in average temperatures, which increase the likelihood of heat waves and ozone levels. The effects of climate change are identified in Table 5. While identified effects such as sea level rise and increases in extreme weather can indirectly impact human health, neither the EPA nor CARB has established ambient air quality standards for GHG emissions. The state’s GHG reduction strategy outlines a path to avoid the most catastrophic effects of climate change. Yet the state’s GHG reduction goals and strategies are based on the state’s path toward reducing statewide cumulative GHGs as outlined in AB 32, SB 32, AB 1279, and Executive Order S-03-05. Because no single project is large enough to result in a measurable increase in global concentration of Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-16
GHG emissions, climate change impacts of a project are considered on a cumulative basis.

Without federal ambient air quality standards for GHG emissions and given the cumulative nature of GHG emissions, it is not feasible at this time to connect the project’s specific GHG emission to the potential health impacts of climate change.

4.8.3 Impact Analysis
Methodology
The GHG evaluation was prepared in accordance with the requirements of CEQA to determine if significant GHG impacts are likely in conjunction with the type and scale of development associated with the proposed Project. Air pollutant and GHG emissions are calculated using the California Emissions Estimator Model (CalEEMod), version 2022.1. CalEEMod compiles an emissions inventory of construction (fugitive dust, off-gas emissions, on-road emissions, and off-road emissions), area sources, indirect emissions from energy use, mobile sources, indirect emissions from waste disposal (annual only), and indirect emissions from water/wastewater (annual only).

The operational-phase, project-related emissions are based on development of the new proposed commercial and retail land uses. The modeling accounts for the average daily vehicle trips generated, energy usage, water demand, and wastewater and solid waste generation from operation of the proposed Project. Construction emissions are based on information provided for the Project. Where specific information was not available, CalEEMod default values were utilized.

Life cycle emissions are not included in this analysis because not enough information is available.5 • Transportation. The project-related weekday and weekend average daily trip generation data and vehicle miles traveled (VMT) data are provided by Integrated Engineering Group in Appendix H. Project-related VMT, including those associated with light-, medium-, and heavy-duty trucks, was calculated using the KernCOG regional travel demand model, which, in general, is calibrated to account for truck travel distinct from travel associated with passenger vehicles. Transportation criteria pollutant and GHG emissions are based on CalEEMod default vehicle emissions. The modeled fleet mix is based on vehicle fleet mix data provided by IEG and CalEEMod default fleet mix data. The primary source of mobile criteria air pollutants and GHG emissions is tailpipe exhaust emissions from the combustion of fuel (i.e., gasoline and diesel). In addition, for criteria air pollutants, brake and tire wear along with fugitive dust created from vehicles traveling roadways also generate particulate matter.
• Energy Use. Electricity and natural gas demand for the proposed Project is based on CalEEMod default energy rates. Per the Project applicant, the proposed onsite PV systems would generate an anticipated 1,201,933 kilowatt hour (kWh) per year of renewable electricity. For purposes of this analysis, the CalEEMod default electricity demand for the regional shopping center land use is reduced by the anticipated 1,201,933 kWh per year of renewable electricity. Use of natural gas would generate both criteria 5 Life cycle emissions include indirect emissions associated with materials manufacture. However, these indirect emissions involve numerous parties, each of which is responsible for GHG emissions of their particular activity. The California Resources Agency, in adopting the CEQA Guidelines Amendments on GHG emissions found that lifecycle analysis was not warranted for project-specific CEQA analysis in most situations, for a variety of reasons, including lack of control over some sources, and the possibility of double-counting emissions (see Final Statement of Reasons for Regulatory Action, December 2009). Because the amount of materials consumed during the operation or construction of the proposed project is not known, the origin of the raw materials purchased is not known, and manufacturing information for those raw materials is also not known, calculation of life cycle emissions would be speculative. A life-cycle analysis is not warranted (LCI 2008).

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-17
pollutant and GHG emissions, and use of electricity would contribute to GHG emissions generation.
• Water/Wastewater. Water demand data for the proposed Project is based on and derived from the water supply and demand analysis. In total, the proposed project is estimated to use 148,925 gallons per day and 54,357,625 gallons per year. GHG emissions from this sector are attributed to the electricity used for treatment and distribution of water and wastewater.
• Solid Waste. Solid waste generation for the proposed uses is based on CalEEMod defaults. GHG emissions are associated with the decomposition of solid waste. • Area Sources. Area source emissions from use of consumer cleaning products and VOC emissions from paints are based on CalEEMod default values and the square footage of the proposed buildings.
• Refrigerants. GHG emissions from operation of building air conditioning and refrigeration equipment are based on CalEEMod default values based on land use type. • Construction. Appendix B shows the assumed construction activities, phasing, and construction equipment based on information provided by the project applicant and CalEEMod defaults. Demolition debris generated from the left turn lane installation would result in the export of 575 tons of demolition debris. The Project Site would be a balanced site and site preparation and grading activities would not result in export or import of soil.

Emissions of VOCs would primarily be from the application of paints, asphalt pavement, and operation of construction vehicles and off-road equipment. Emissions of NOX, CO, and SOX would primarily be generated from operation of off-road construction equipment as well as construction worker and vendor vehicles. Coarse and fine particulate matter (PM10 and PM2.5) exhaust emissions would also be generated from operation of off-road construction equipment and construction and vendor vehicle trips. Fugitive dust emissions of PM10 and PM2.5 would be generated from ground disturbance activities and asphalt demolition.

The following thresholds of significance are based on the Environmental Checklist contained in Appendix G of the CEQA Guidelines.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance6to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment.
• Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs.
6 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available
at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-18
Project Impacts
Threshold GHG-1: Would the project generate greenhouse gas emissions, either directly or indirectly, that may have a significant impact on the environment? Impact Analysis
Global climate change is not confined to a particular project area and is generally accepted as the consequence of global industrialization over the last 200 years. A typical project, even a very large one, does not generate enough greenhouse gas emissions on its own to influence global climate change significantly; hence, the issue of global climate change is by definition a cumulative environmental impact.

Operation of the Project would generate GHG emissions from vehicle trips, water demand, wastewater and solid waste generation, area sources (e.g., consumer cleaning products), energy usage (i.e., natural gas and electricity), and refrigerants. The Project operational emissions for each phase of development and full buildout are shown in Table 4.8-2, Project Operation GHG Emissions Inventory. As shown in the table, the primary source of project-related emissions would be from mobile-source emissions generated from Project vehicle trips (e.g., employees and patrons). The next largest sources of emissions would be from energy usage, followed by the solid waste and water sectors. Overall, development of the Project would generate annual operational phase GHG emissions of 16,027 MTCO2e per year under full buildout year conditions and would not achieve net zero GHG emissions.

Compliance with SJVAPCD’s Rule 9410 eTRIP program for individual businesses in which the program would apply could contribute to reducing Project-related vehicle trips and mobile sources to the extent feasible. However, it is not anticipated that compliance with Rule 9410 would result in the reductions needed to achieve net zero for the Project. Overall, GHG emissions generated by the Project would be considered to cumulatively contribute to statewide GHG emissions.

Impacts would be significant.

Table 4.8-2 Project Operation GHG Emissions Inventory
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Phase 1 (2026 Opening Year)
Mobile1,2 13,481 94%
Area 5 <1%
Energy 644 4%
Water 75 1%
Solid Waste 194 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 12 <1%
Total All Sectors 14,431 100%
Phase 2 (2027 Opening Year)
Mobile1,3 1,709 91%
Area 1 <1%
Energy 128 7%
Water 19 1%
Solid Waste 29 2%
Refrigerants <1 <1%
Amortized Construction (30-years) 6 <1%
Total All Sectors 1,892 100%
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-19
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Full Buildout (2027 Opening Year)
Mobile1,3 14,894 93%
Area 6 <1%
Energy 773 5%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 16,027 100%
Net Zero Threshold 0 MTCO2e N/A
Exceeds Threshold? Yes N/A
Source: CalEEMod, Version 2022.1.

Notes: Manual summation of values may not equal to the shown totals due to rounding. 1 Based on trip generation, VMT, and vehicle fleet mix data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2026 emissions data.
3 Based on calendar year 2027 emissions data.

Mitigation Measures
MM GHG-1 The project proponent/developer shall design and construct the proposed buildings to be all electric, with electricity to be the only permanent source of energy for all nonemergency building energy needs, including but not limited to water heating; mechanical equipment; and heating, ventilation, and air conditioning (HVAC) (i.e., space-heating and space cooling). All major appliances (e.g., dishwashers, refrigerators, and water heaters) provided/installed shall be electric-powered EnergyStar certified or an equivalent energy efficiency where applicable. The only exception to this measure shall be limited to commercial cooking uses. Prior to issuance of building permits for development projects, project proponent/developer shall provide plans that show the aforementioned requirements to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify installation of the electric-powered EnergyStar or equivalent appliances.

MM GHG-2 Prior to issuance of the certificate of occupancy, the property owner shall provide documentation to the City of Bakersfield Building Division demonstrating enrollment in a 100 percent carbon-free electricity energy plan, such as the Pacific Gas & Electric’s (PG&E) 100% Solar Choice plan, for proposed project building(s) if such plan is available. If a 100 percent carbon-free electricity plan is not available, the property owner shall enroll in an energy plan with the next highest carbon-free electricity until a 100 percent carbon-free electricity energy plan becomes available. Measures to achieve 100 percent carbon-free electricity use may include, but are not limited to, plans for 100 percent renewable electricity. If such carbon-free electricity energy plans are waitlisted, the property owner may enroll in an available energy plan in the meantime, but shall sign up for the waiting list for and enroll in a carbon-free electricity energy plan when it becomes available.

MM GHG-3 All landscaping equipment (e.g., leaf blower) used for property management shall be electric-powered only. Prior to issuance of the first certificate of occupancy, the property owner shall provide documentation (e.g., purchase, rental, and/or services agreement) to the City of Bakersfield Building Division to verify that all landscaping equipment utilized will be electric-powered.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-20
MM GHG-4 Any off-road equipment (e.g., forklifts) used in daily business operations shall be electric-powered. The project proponent/developer shall disclose this requirement to all tenants/business entities prior to the signing of any lease agreement. In addition, the limitation to use only electric-powered off-road equipment shall be included in all leasing agreements.

Prior to issuance of a Business License for a new tenant/business entity, the project proponent/developer and tenant/business entity shall provide a signed document (verification document) to the City of Bakersfield (City) noting that the property owner has disclosed to the tenant/business entity the requirement to use only electric-powered equipment for daily operations. This verification document shall be signed by authorized agents for the project proponent/developer and tenant/business entities. In addition, if applicable, the tenant/business entity shall provide documentation (e.g., purchase or rental agreement) to the City to verify, to the City’s satisfaction, that any off-road equipment utilized will be electric-powered.

MM GHG-5 The project proponent/developer shall coordinate with Golden Empire Transit and provide improvements (e.g., bus shelter) of up to two bus stops. Prior to issuance of the first certificate of occupancy, the project proponent/developer shall provide documentation to the City of Bakersfield Building Division to verify, to the City’s satisfaction, that coordination with Golden Empire Transit has been initiated.

MM GHG-6 The project proponent/developer shall install an end-of-trip shower facility. This end-of-trip shower facility requirement shall be incorporated into all site plans and appropriate building plans and submitted to the City of Bakersfield Building Division. Prior to issuance of the certificate of occupancy, the City of Bakersfield Building Division shall verify the installation of end-of-trip shower facility.

MM GHG-7 The project proponent/developer shall design the parking areas to comply with the Tier 2 Nonresidential Voluntary Measures of the California Green Building Standards Code (CALGreen), Division A5.1, Planning and Design, Section A5.106.5.3.4. This requirement shall be identified on all prepared building and site plans. The project proponent/developer shall submit these building and site plans that note this requirement to the City of Bakersfield Building Division prior to the issuance of construction permits.

Table 4.8-3, Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3, shows the Project-related annual emissions at full buildout with incorporation of Reduction Measure GHG-1 (all-electric building systems and appliances) and Reduction Measure GHG-3 (electric-powered landscaping equipment) in addition to the net change compared to the project-related annuals emissions at full buildout without the reduction measures. Implementation of MM GHG-1 and GHG-3 would contribute to supporting and encouraging use of electricity instead of natural gas or other liquid fuels, which would minimize on-site generation of GHG emissions. As shown in Table 4.8-3, implementation of MM GHG-1 and GHG-3 would reduce project-related GHG emissions by 102 MTCO2e/yr. However, these two mitigation measures would not reduce Project-related emissions to achieve net zero. Overall, the other mitigation measures would help contribute to reducing operation-related Project GHG emissions to the extent feasible.

For example, MM GHG-2 would contribute to increasing use of carbon-free renewable electricity and supplement the on-site renewable electricity generated by the proposed on-site PV systems.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-21
Additionally, MM GHG-5 and GHG-6 would result in active and public transit facility improvements and encourage active transit and public transit use, which would contribute to reducing passenger VMT. Furthermore, MM GHG-7 would result in increased EV charging infrastructure improvements and support use and adoption of EVs. Overall, although implementation of reduction measures would reduce Project-related GHG emissions to the extent feasible, operation of the proposed Project is still anticipated to generate GHG emissions and would not achieve the net zero threshold. Thus, Project-related GHG emissions would have a substantial cumulative contribution to GHG emissions impacts.

Table 4.8-3 Project Operation GHG Emissions Inventory With Reduction Measures GHG-1 and GHG-3
Source
GHG Emissions
(MTCO2e Per Year) (Percent)
Full Buildout (2027 Opening Year) Without
Mitigation
Mobile1,2 14,894 93%
Area 6 <1%
Energy 773 5%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 16,027 100%
Full Buildout (2027 Opening Year) With
Mitigation
Mobile1,2 14,894 93%
Area3 0 0%
Energy4 677 4%
Water 94 1%
Solid Waste 223 1%
Refrigerants 19 <1%
Amortized Construction (30-years) 18 <1%
Total All Sectors 15,926 100%
Net Zero Threshold 0 MTCO2e N/A
Exceeds Threshold? Yes N/A
Net Change
Mobile 0 N/A
Area (6) N/A
Energy (96) N/A
Water 0 N/A
Solid Waste 0 N/A
Refrigerants 0 N/A
Amortized Construction (30-years) 0 N/A
Total All Sectors (102) N/A
Source: CalEEMod, Version 2022.1.

Notes: Manual summation of values may not equal to the shown totals due to rounding. 1 Based on trip generation, VMT, and vehicle fleet mix data provided by Integrated Engineering Group (2026). 2 Based on calendar year 2027 emissions data.
3 Includes implementation of Reduction Measure GHG-3, which requires all landscaping equipment to be electric-powered. 4 Includes implementation of Reduction Measure GHG-1, which requires all-electric building systems and appliances for land uses except for commercial cooking uses.

Level of Significance After Mitigation
Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-22
Impact significant and unavoidable.

Threshold GHG-2: Would the project conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of greenhouse gases?
Impact Analysis
Applicable plans adopted for the purpose of reducing GHG emissions include CARB’s Scoping Plan and Kern COG’s RTP/SCS. A consistency analysis with these plans is presented below.

CARB Scoping Plan
The CARB Scoping Plan is applicable to state agencies but is not directly applicable to cities/counties and individual projects (i.e., the Scoping Plan does not require the City to adopt policies, programs, or regulations to reduce GHG emissions). However, new regulations adopted by the state agencies outlined in the Scoping Plan result in GHG emissions reductions at the local level. As a result, local jurisdictions benefit from reductions in transportation emissions rates, increases in water efficiency in the building and landscape codes, and other statewide actions that affect a local jurisdiction’s emissions inventory from the top down. Statewide strategies to reduce GHG emissions include the LCFS and changes in the corporate average fuel economy standards (e.g., Pavley I and Pavley California Advanced Clean Cars program).

The Project would adhere to the programs and regulations identified by the Scoping Plan and implemented by state, regional, and local agencies to achieve the statewide GHG reduction goals of AB 32 and SB 32. For example, new buildings under the proposed project would be required to, at minimum, meet the current CALGreen and Building Energy Efficiency Standards. The Project would install on-site PV systems to generate renewable electricity (anticipated 1,201,933 kWh/yr), which would be in compliance with the PV requirements under Section 140.10 of the Building Energy Efficiency Standards. Additionally, the Project would include electric vehicle (EV) parking in compliance with the CALGreen EV parking requirements. Installation of the proposed PV systems and EV parking spaces would contribute to achieving the building decarbonization and transportation electrification strategies of the Scoping Plan. Overall, development of the Project would not obstruct implementation nor be inconsistent with the CARB Scoping Plan.

Kern COG’s Regional Transportation Plan/Sustainable Communities Strategy The Kern COG 2022 RTP/SCS transportation projects help more efficiently distribute population, housing, and employment growth, and forecast development is generally consistent with regional-level general plan data to promote active transportation and reduce GHG emissions. The projected regional development, when integrated with the proposed regional transportation network in the 2022 RTP/SCS, would reduce per-capita GHG emissions related to vehicular travel and achieve the GHG reduction per capita targets for the Kern COG region. The 2022 RTP/SCS does not require that local general plans, specific plans, or zoning be consistent with the SCS, but provides incentives for consistency to governments and developers.

The Project would result in the development of a shopping center that would provide retail and commercial uses within the interior area of the City. A VMT analysis was prepared in accordance with Senate Bill 743 to evaluate potential VMT impacts of the project. Per the analysis, the Project would result in an overall net increase in countywide roadway VMT under both existing and cumulative conditions. Additionally, the proposed medical office use would exceed the applicable VMT per employee threshold. Therefore, the Project would not fully support the overall goal of Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-23
the Kern COG 2022 RTP/SCS in reducing per capita GHG emissions related to passenger vehicle travel. Impacts would be significant.

Mitigation Measures
MM GHG-5 and MM GHG-6.

Level of Significance After Mitigation
Impact significant and unavoidable.

Per the VMT analysis prepared, the Project has been designed to incorporate feasible VMT reducing strategies. The Project would include end-of-trip bicycle facilities such as bicycle parking and lockers. In addition, it also includes bicycle facility improvements as it proposes a new bicycle lane along Rosedale Highway, which would extend an existing facility and improve overall bicycle network connectivity. Furthermore, the Project includes pedestrian network improvements such as new sidewalks along its frontages, which would improve pedestrian connectivity and walkability (GTS 2025). Aside from these Project-related design features, future commercial tenants of the proposed Project would be subject to the SJVAPCD Rule 9410 eTRIP rule. These Project improvements in addition to the SJVPACD eTRIP rule would contribute to reducing Project-generated VMT to the extent feasible.

Incorporation of MM GHG-5 and GHG-6, which would result in improvements for up to two bus stops and installation of an onsite end-of-trip shower facility, would also contribute to reducing project-generated VMT to the extent feasible by supporting public transit and bicycle use.

However, overall, the proposed Project would continue to be inconsistent with the Kern COG 2022 RTP/SCS.

Cumulative Impacts
Project-related GHG emissions are not confined to a particular air basin, but are dispersed worldwide. Therefore, impacts identified under Impact GHG-1 are not project-specific impacts to global warming, but the Project’s contribution to this cumulative impact. As stated, implementation of MM GHG-1 through GHG-7 would contribute to minimizing project-related energy sector and mobile source GHG emissions to the extent feasible. However, the Project would still result in a net increase in GHG emissions. Thus, the Project’s GHG emissions and contribution to global climate change impacts are considered cumulatively considerable.

Mitigation Measures
MM GHG-1 through GHG-7
Level of Significance After Mitigation
Impact significant and unavoidable.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.8 Greenhouse Gas Emissions City of Bakersfield – SCH No. 2025101507 4.8-24
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.9-1

4.9 Hazards and Hazardous Materials
This Section discusses any potential environmental impacts associated with hazards and hazardous materials (other than geologic and flood hazards) associated with implementation of the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to create significant hazards through the use, transport, or handling of hazardous materials; upset or accident conditions; emit hazardous materials near schools; be located on a hazardous site; safety and noise conditions near an airport; impair an emergency response plan; or increase exposure to wildfire. This section evaluates potential impacts related to hazards and hazardous materials and identifies measures to reduce or avoid significant impacts.

The analysis in this Section is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether the Project would result in significant impacts associated with hazards and hazardous materials. Information in this Section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan); the City of Bakersfield (City) Municipal Code (BMC) Title 17 (Zoning Ordinance); a Phase I Environmental Site Assessment (Phase I ESA) prepared for the Project by Rincon Consultants (Rincon), dated August 21, 2025; a Soil Vapor Sampling Report (Soil Vapor Report) prepared for the Project by Rincon, dated November 2024 (See Appendix F-1, Phase I ESA); and an Engineering Review of Plugged & Abandoned Oil & Gas Wellbores “REID-KCL” #1 and #3 (Well Engineering Report), prepared by Petrotech Resources Company, Inc. (Petrotech), dated March 1, 2026 (See Appendix F-2, Engineering Review of Plugged and Abandoned Oil and Gas Wellbores).

These Project-specific reports are included in Appendix F, Hazards and Hazardous Materials Supporting Information, of this Draft Environmental Impact Report (EIR).

During the scoping period for the Project’s EIR, no comments were received in response to the Notice of Preparation (NOP) regarding hazardous and hazardous materials.

4.9.1 Regulatory Setting
Federal
Clean Water Act
The Clean Water Act (CWA) (33 U.S.C. Section 1251 et seq.) was enacted with the intent of restoring and maintaining the chemical, physical, and biological integrity of the waters of the United States. The CWA requires states to set standards to protect, maintain, and restore water quality through the regulation of point source and certain non‐point source discharges to surface water. Those discharges are regulated by the National Pollutant Discharge Elimination System (NPDES) permit process (CWA Section 402). In California, NPDES permitting authority is delegated to, and administered by, the nine Regional Water Quality Control Boards (RWQCBs).

The Project is within the jurisdiction of the Central Valley RWQCB.

Section 402 of the Clean Water Act authorizes the California State Water Resources Control Board (SWRCB) to issue NPDES General Construction Storm Water Permit (Water Quality Order 99‐08‐DWQ), referred to as the “General Construction Permit.” Construction activities can comply with and be covered under the General Construction Permit provided that they:

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-2
• Develop and implement a Storm Water Pollution Prevention Plan (SWPPP) which specifies Best Management Practices (BMPs) that will prevent all construction pollutants from contacting stormwater and with the intent of keeping all products of erosion from moving off‐site into receiving waters;
• Eliminate or reduce non‐stormwater discharges to storm sewer systems and other waters of the nation; and
• Perform inspections of all BMPs.

NPDES regulations are administered by the RWQCB. Projects that disturb one or more acres are required to obtain NPDES coverage under the Construction General Permits.

Comprehensive Environmental Response, Compensation, and Liability Act The Comprehensive Environmental Response, Compensation, and Liability Act, as amended (CERCLA)(42 United States Code [U.S.C.] Section 9601 et seq.), commonly known as the “Superfund,” provides federal funding to identify and remediate hazardous materials sites.

CERCLA establishes requirements concerning closed and abandoned hazardous materials sites; provides for liability of persons responsible for releases of hazardous materials at these sites; and establishes a trust fund to provide for cleanup when no responsible party can be identified.

CERCLA also enabled revision of the National Contingency Plan (NCP). The NCP (40 Code of Federal Regulations [CFR] Part 300) established the National Priorities List (NPL), identifying hazardous materials cleanup sites around the country and provides the guidelines and procedures needed to respond to releases and threatened releases of hazardous materials.

The Superfund process includes conducting a preliminary site assessment/inspection, listing on the NPL, preparation of a remedial investigation/feasibility study (RI/FS), and filing a record of decision identifying the cleanup method, remedial design, and remedial action. The NPL is a list of the worst hazardous waste sites that have been identified by Superfund.

The Superfund Amendments and Reauthorization Act (SARA) reauthorized and amended CERCLA to provide clarification on the law, establish new means of enforcement, and increase State and citizen involvement in the Superfund program. SARA increased the Superfund trust fund to $8.5 billion.1
Emergency Planning and Community Right-to-Know Act
The federal Emergency Planning and Community Right-To-Know Act (EPCRA) was enacted to inform communities and residents of chemical hazards in their area. Businesses are required to report the locations and quantities of chemicals stored on-site to both State and local agencies.

EPCRA requires the U.S. EPA to maintain and publish a digital database list of toxic chemical releases and other waste management activities reported by certain industry groups and federal facilities. This database, known as the Toxic Release Inventory, gives the community more power to hold companies accountable for their chemical management.

Hazardous Materials Transportation Act
The Hazardous Materials Transportation Act of 1975 (HMTA)(49 U.S.C. Sections 5101–5127) authorizes the U.S. Department of Transportation (U.S. DOT) to regulate the transportation of hazardous materials in the United States. The U.S. DOT is the primary regulatory authority for 1 United States Environmental Protection Agency. 2025. The Superfund Amendments and Reauthorization Act (SARA) webpage.

Available at: https://www.epa.gov/superfund/superfund-amendments-and-reauthorization-act-sara. Accessed April 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-3
the interstate transport of hazardous materials and establishes regulations for safe handling procedures (i.e., packaging, marking, labeling, and routing).

Hazardous Materials Transportation Uniform Safety Act
The transportation of hazardous materials is regulated at the federal level under HMTA, as amended by the Hazardous Materials Transportation Uniform Safety Act of 1990 (HMTUSA).

HMTUSA was enacted to improve the safe transportation of hazardous materials in intrastate, interstate, and foreign commerce and to promote nationwide uniformity among hazardous materials transportation regulations. Under HMTUSA, the U.S. Secretary of Transportation is authorized to designate hazardous materials, promulgate and enforce regulations governing their transportation, and establish requirements related to packaging, labeling, handling, routing, and permitting. The HMTUSA also clarifies the extent to which federal hazardous materials transportation regulations preempt inconsistent state and local requirements, while allowing states and Indian tribes to designate highway routes and impose restrictions for hazardous materials transportation when such actions are consistent with federal standards. Compliance with regulations adopted pursuant to HMTUSA is intended to minimize risks to public health, safety, property, and the environment associated with the transportation of hazardous materials.

Occupational Safety and Health Act
Congress passed the Occupational and Safety Health Act of 1970 (OSH Act)(29 U.S.C. Section 651 et seq.) to ensure worker and workplace safety. The OSH Act was intended to ensure that employers provide places of employment free from recognized hazards to safety and health. The OSH Act established the National Institute for Occupational Safety and Health (NIOSH) as the research institution for the Occupational Safety and Health Administration (OSHA), a division of the U.S. Department of Labor that oversees the administration of the OSH Act. OSHA’s Hazardous Waste Operations and Emergency Response Standards apply to five groups of employers and their employees. This includes any employees who are exposed or potentially exposed to hazardous substances (including hazardous waste) and who are engaged in clean-up operations; corrective actions; voluntary clean-up operations; operations involving hazardous wastes at treatment, storage, and disposal facilities; and emergency response operations.

Resource Conservation and Recovery Act/Hazardous and Solid Waste Act Resource Conservation and Recovery Act (RCRA)(42 U.S.C. Section 6901 et seq.) authorized the U.S. EPA to enact a “cradle to grave” system of regulating hazardous wastes. This includes enabling, reporting, and record keeping requirements for the generation, transportation, treatment, storage, and disposal of hazardous wastes.

Toxic Substances Control Act
The Toxic Substances Control Act of 1976 (TSCA)(15 U.S.C. Sections 2601–2629) charged the United State Environmental Protect Agency (U.S. EPA) with the authority to regulate testing, record keeping, and reporting requirements for certain chemical substances. Specific substances, including polychlorinated biphenyls (PCBs), asbestos, lead-based paint, and radon were specifically addressed by the TSCA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-4
State
Assembly Bill 30 (2022)
Assembly Bill (AB) 30 established statewide requirements to reduce emissions of volatile organic compounds (VOCs) associated with gasoline storage and dispensing by requiring the use of certified vapor recovery controls at service stations. In general, these requirements are implemented through the California Air Resources Board (CARB) and local air districts and include controls for gasoline vapors displaced during both fuel deliveries to underground storage tanks (often referred to as Phase I or Stage I vapor recovery) and vehicle refueling at the dispenser (often referred to as Phase II or Stage II vapor recovery, where applicable). Compliance with applicable vapor recovery requirements is intended to minimize evaporative emissions of gasoline constituents (including benzene and other VOCs), thereby reducing potential public exposure and contributing to attainment of ambient air quality standards.

California Code of Regulations Title 22
Hazardous waste management and transportation in California are regulated under Title 22 of the California Code of Regulations (CCR), Division 4.5, which establishes environmental health standards for the identification, generation, transportation, treatment, storage, and disposal of hazardous waste. Title 22 is administered by the California Department of Toxic Substances Control (DTSC) and implements the statutory requirements of the California Hazardous Waste Control Law. Of particular relevance to hazardous materials transportation, Chapter 13 of Title 22 sets forth standards applicable to transporters of hazardous waste, including requirements for compliance with the hazardous waste manifest system, recordkeeping, spill response, and discharge reporting. Title 22 regulations also incorporate and are intended to be consistent with applicable federal hazardous materials transportation regulations, including those adopted by the U.S. Department of Transportation. Compliance with Title 22 is intended to ensure the safe handling and transportation of hazardous waste within, into, out of, and through the State of California, thereby minimizing potential risks to public health, safety, and the environment.

California Occupational Safety and Health Administration The California Occupational Safety and Health Administration (Cal/OSHA) is the primary agency responsible for worker safety in the handling and use of chemicals in the workplace. Cal/OSHA standards are generally more stringent than federal regulations. Employers are required to monitor worker exposure to listed hazardous substances and notify workers of exposure (8 CCR Sections 337‐340). The regulations specify requirements for employee training, availability of safety equipment, accident‐prevention programs, and hazardous substance exposure warnings.

In addition, Cal/OSHA regulates medical and/or infectious waste.

CCR Title 8, Industrial Relations, contains the State’s occupational safety and health regulations and related labor rules administered through the California Department of Industrial Relations, including Cal/OSHA requirements, intended to protect workers and the public from workplace hazards. For hazards and hazardous materials, Title 8 establishes standards for injury and illness prevention planning, hazard communication (e.g., chemical identification, labeling, and safety data sheets), employee training, exposure monitoring and control, and the provision and use of appropriate personal protective equipment. Title 8 also includes industry-specific safety orders applicable to construction and general industry activities (e.g., requirements for excavation safety, demolition, confined spaces, and equipment operation), which would apply to Project construction and operational activities as applicable.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-5
Cal/OSHA has established construction-related asbestos standards (8 CCR Section 1529) and industrial-related asbestos standards (8 CCR Section 5208). These standards regulate handling and disposal of asbestos encountered during construction and industrial activity. Construction related asbestos standards apply to exposure associated with construction work such as demolition and excavation. The industrial standards apply to all industrial activity that falls under Cal/OSHA purview. Cal/OSHA has also established standards addressing lead paint encountered during construction (8 CCR Section 1532.1). These standards include exposure assessment, safety requirements, and employee training pertaining to lead exposure and handling.

California Fire Code
The California Fire Code (CFC) is included in the California Building Standards Code (CBC) (24 CCR DTPart 9). The CFC includes provisions and standards for emergency planning and preparedness, fire service features, fire protection systems, hazardous materials, fire flow requirements, fire hydrant locations and distribution.

Department of Toxic Substances Control
DTSC is a department of the California Environmental Protection Agency (CalEPA) with responsibility for implementing and enforcing California’s own hazardous waste laws (known collectively as the Hazardous Waste Control Law). Although similar to RCRA, the California Hazardous Waste Control Law and its associated regulations define hazardous waste more broadly and regulate a larger number of chemicals. Hazardous wastes regulated by California but not by the U.S. EPA are called “non-RCRA hazardous wastes.” Other laws that affect hazardous waste are specific to handling, storage, transportation, disposal, treatment, reduction, cleanup, and emergency planning.

The Hazardous Waste and Sites List (Cortese List) (Government Code [Gov. Code] Section 65962.5) includes DTSC-listed hazardous waste facilities and sites, Department of Health Services lists of contaminated drinking water wells, sites listed by the SWRCB as having underground storage tank leaks and have had a discharge of hazardous wastes or materials into the water or groundwater, and lists from local regulatory agencies of sites that have had a known migration of hazardous waste/material.

Hazardous Materials Release Response Plans and Inventory Act of 1985 The Hazardous Materials Release Response Plans and Inventory Act (Business Plan Act)(Health and Saf. Code [HSC], Div. 20, Ch. 6.95), requires businesses using hazardous materials to prepare a plan that describes their facilities, hazardous materials inventories, emergency response plans, and training programs. Businesses must submit this information to their respective County Department of Environmental Health (DEH). The DEH verifies the information and provides it to agencies responsible for protection of public health and safety and the environment. Business Plans are required to include emergency response plans and procedures in the event of a reportable release or threatened release of a hazardous material. These plans must include, but are not limited to:
• Protocols for immediate notification to the administering agency and to the appropriate local emergency rescue personnel.
• Procedures for the mitigation of a release or threatened release to minimize any potential harm or damage to persons, property, or the environment. • Evacuation plans and procedures, including immediate notice, for the business site.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-6
Business Plans are also required to include training for all new employees, and annual training, including refresher courses, for all employees in safety procedures in the event of a release or threatened release of a hazardous material.

Hazardous Waste Control Act
The Hazardous Waste Control Act of 1972 (HSC Section 25100 et seq.) created the State hazardous waste management program, which is similar to, but more stringent than, the federal RCRA program. The act is implemented by regulations contained in Title 26 of the CCR, which describes the following required aspects for the proper management of hazardous waste:
identification and classification; generation and transportation; design and permitting of recycling, treatment, storage, and disposal facilities; treatment standards; operation of facilities and staff training; and closure of facilities and liability requirements. These regulations list more than 800 materials that may be hazardous and establish criteria for identifying, packaging, and disposing of such waste. Under the Hazardous Waste Control Act and Title 26, the generator of hazardous waste must complete a manifest that accompanies the waste from generator to transporter to the ultimate disposal location. Copies of the manifest must be filed with the DTSC.

Public Resources Code 3208.1
Public Resources Code (PRC) Section 3208.1 authorizes the California Geologic Energy Management Division (CalGEM) or a district deputy to order or permit the re-abandonment of a previously abandoned oil or gas well when there is reason to question the integrity of the prior abandonment, or when the well is not accessible or visible, to prevent damage to life, health, and property. The statute also establishes responsibility for re-abandonment costs. Generally, the operator responsible for plugging and abandoning “deserted” wells under PRC Section 3237 remains responsible; however, in limited circumstances the property owner, developer, or other party causing construction over or near the well, or a party that later disturbs the abandonment integrity, may be required to obtain necessary rights and perform or fund the re-abandonment.

These provisions are intended to ensure previously abandoned wells remain protective and accessible for future monitoring or remedial work, particularly where site redevelopment is proposed.

Unified Hazardous Waste and Hazardous Materials Management Regulatory Program The Unified Hazardous Waste and Hazardous Materials Management Regulatory Program (Unified Program) required the administrative consolidation of six hazardous materials and waste programs (Program Elements) under one agency, a Certified Unified Program Agency (CUPA).

The CUPA designated for the City is the Bakersfield Fire Department (BFD), which consists of 14 fire stations and 300 firefighters. Within the BFD, the CUPA program is part of the Fire Prevention Division and has seven inspectors and one supervisor. They currently regulate about 1,600 facilities and implement all six CUPA Program Elements for the City. BFD combines the annual fire safety inspection with the appropriate CUPA elements. The information put into the California Environmental Reporting System (CERS) is available to first responders and provides facility maps, chemical inventories and contact information, all critical information for responders.2 The Unified Program is intended to provide relief to businesses complying with the overlapping and sometimes conflicting requirements of formerly independently managed programs. The Unified Program is implemented at the local government level by CUPAs. Most CUPAs have been 2 California CUPA Forum. 2026. CUPA Profiles. Bakersfield City Fire Department. Available at: https://calcupa.org/cupa-profiles/index.html#:~:text=The%20CUPA%20program%20here%20is,program%20elements%20for%20the%20city. Accessed April 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-7
established as a function of a local environmental health or fire department. Some CUPAs have contractual agreements with another local agency, a participating agency, which implements one or more Program Elements in coordination with the CUPA.

The Program Elements consolidated under the Unified Program are Hazardous Waste Generator and On‐site Hazardous Waste Treatment Programs (“Tiered Permitting”); Aboveground Petroleum Storage Tank Spill Prevention, Control, and Countermeasure (SPCC) plans; Hazardous Materials Release Response Plans and Inventory Program (Hazardous Materials Disclosure or “Community‐Right‐To‐Know”); California Accidental Release Prevention Program (Cal ARP); Underground Storage Tank (UST) Program; and Uniform Fire Code Plans and Inventory Requirements.

Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16, 019-16. At the time this EIR was published for public review, the City was in the process of updating its General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Open Space; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies regarding hazards and hazardous materials.

Land Use Element
LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

Safety Element
SAFE/GEN-G-1 To develop sustainable communities to preserve life, protect property, the environment, and the economy from natural hazards.

SAFE/GEN-P-1 The adopted Kern County, California Multi-Hazard Mitigation Plan is incorporated by reference. This multi-jurisdictional plan, approved in compliance with the Disaster Mitigation Act of 2000, provides long-term planning to reduce the impacts of future disasters.

SAFE/PUB-G-4 Assure that fire, hazardous substance regulation and emergency medical service problems are continuously identified and addressed in a proactive way, in order to optimize safety and efficiency.

SAFE/PUB-G-7 Protect land uses from the risk of dam failure inundation including the assurances that: the functional capabilities of essential facilities are available in the event of a flood; hazardous materials3 are not released; effective measures for mitigation of dam failure inundation are incorporated into the design of critical facilities; and the rapid and orderly evacuation of populations in the inundation area will occur.
3 Hazardous materials are defined as injurious substances, including pesticides, herbicides, toxic metals and chemicals, liquified natural gas, explosives, volatile chemicals, and nuclear fuels.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-8
SAFE/PUB-P-4 Monitor, enforce and update as appropriate all emergency plans as needs and conditions in the planning area change, including the California Earthquake Response Plan, the Kern County Evacuation Plan, and the City of Bakersfield Disaster Plan
SAFE/PUB-P-7 Enforce ordinances regulating the use/manufacture/sale/transport/ disposal of hazardous substances and require compliance with state and federal laws regulating such substances
SAFE/PUB-P-8. The Kern County and Incorporated Cities Hazardous Waste Management Plan and Final Environmental Impact Report serve as the policy document guiding all facets of hazardous waste
SAFE/PUB-P-18 Design discretionary critical facilities located within the potential inundation area for dam failure in order to: mitigate the effects of inundation on the facility; promote orderly shut-down and evacuation (as appropriate); and prevent on-site hazards from affecting building occupants and the surrounding communities in the event of dam failure
SAFE/PUB-P-19 Design discretionary facilities in the potential dam inundation area used for the manufacture, storage or use of hazardous materials to prevent on-site hazards from affecting surrounding communities in the event of inundation SAFE/PUB-P-24 Require the city's and county's emergency preparedness programs to have a three-fold emphasis: hazard mitigation, disaster response and self-sufficiency of residents, business and industry Kern County Multi-Jurisdictional Hazard Mitigation Plan The Kern Multi-Jurisdictional Hazard Mitigation Plan (MJHMP) was approved by FEMA on April 9, 2021. This Kern MJHMP provides an explanation of prevalent hazards within the County and how hazards may affect the County and participating cities and special districts differently based upon proximities to natural hazards. It also identifies risks to vulnerable assets, both people and property. The mitigation strategy presented in the Kern MJHMP responds to the identified vulnerabilities within each community and provides prescriptions or actions to achieve the greatest risk reduction based upon available resources. The County and participating jurisdictions intend to save lives, reduce injuries, reduce property damage, and protect natural resources for future generations through mitigation activities.4 The City has its own participating jurisdiction annex report that contained individually assessed hazards, explored hazard vulnerability, developed mitigation strategies, and followed the same planning process as County to create the annexes.

Kern County and Incorporated Cities Hazardous Waste Management Plan The Kern County Operational Area Hazardous Materials Area Plan addresses the use, storage, and transportation of hazardous materials and the generation and transportation of hazardous wastes in the Kern County Operational Area. At the time of a significant emergency, the Kern County Operational Area serves as the coordination and communication link between the cities and special districts within the County’s boundaries. Serving as the lead agency in the Kern County Operational Area is the County of Kern, while oversight and administrative support is provided by the Kern County Office of Emergency Services. During incidents involving the release 4 County of Kern. 2021. Kern Multi-Jurisdictional 2020 MJHMP Update. Available at:
https://psbweb.kerncounty.com/planning/pdfs/MJHMP/Volumes/Volume1.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-9
or threatened release of hazardous substances, the Hazardous Materials Area Plan identifies local, State, and federal responsibilities.

4.9.2 Environmental Setting
The following sections describe the environmental setting based on a Phase I ESA prepared by Rincon and dated August 21, 2025; a Soil Vapor Report prepared by Rincon and dated November 2024; and a Well Engineering Report prepared by Petrotech and dated March 1, 2026. These Project-specific reports are included in Appendix F, Hazards and Hazardous Materials Supporting Information, of this Draft EIR.

Existing Conditions
The Project Site is largely vacant and is located south of Rosedale Highway, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located in an area that is primarily composed of residential, commercial, and industrial land uses. Adjacent properties include commercial shopping centers with retail stores and restaurants, a furniture store, a PG&E transmission station, and vacant land. The Project Site is situated at an elevation of approximately 390 feet above mean sea level with topography sloping gently down to the west. The adjacent topography consists of relatively flat land. Multiple power poles and transmission lines are located on the Project Site. No other structures, roads, or other improvements are located on the Project Site. A chain-link fence was noted around the perimeter of the Project Site.

Table 4.9-1, Current Adjacent Land Uses, lists the land uses surrounding the Project Site.

Table 4.9-1 Current Adjacent Land Uses
Direction Relative
to Project Site Description
Northern
Rosedale Highway followed by a commercial shopping center with retail stores and restaurants
Northeastern Intersection of Rosedale Highway and Coffee Road followed by a tire shop Eastern Coffee Road followed by a canal, a commercial shopping center with a restaurant and retail stores, and vacant land to the southeast
Southern PG&E transmission station
Western Restaurant, vacant land, and El Toro Viejo Road followed by a furniture store Source: Rincon, Phase I ESA, 2025.

The Project Site is located within the Fruitvale oil/gas field and four newly “plugged” oil and gas production wells, two previously “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed” tanks are mapped as located on the Project Site.

No natural gas transmission pipelines or hazardous liquid pipelines are located on the Project Site or adjacent properties. Additionally, no pipeline-related accidents or incidents are mapped within 0.25 mile of the Project Site.

Perfluorooctane sulfonic acid (PFOS) was detected in a City drinking water well located approximately 2,800 feet east of the Project Site and tested quarterly as part of a PFAS investigative order. This well contains PFOS at a concentration less than its State Water Resources Control Board (SWRCB) notification level. Perfluorooctanoic acid (PFOA) was not detected above the laboratory reporting limit in this drinking water well.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-10
Historical Uses
The Phase I ESA includes a historical records review completed for the Project Site and is included in Table 4.9-2, Historical Land Uses, below.

Table 4.9-2 Historical Land Uses
Land Use Earliest
Use Date Description
Undeveloped 1906 Undeveloped land
Vacant/
Industrial
1952 Vacant land in the northern/northwestern portion, several aboveground storage tanks (ASTs) and a portion of a power plant with industrial structures in the southeastern portion, power transmission lines traversing the central portion in a north-south direction
Industrial 1961 Similar to previous, with additional smaller ASTs in the northeastern portion and disturbed areas/bermed areas west of a power plant (site drainage controls) and smaller structures (oil wells) in the northern/northwestern portion Industrial 2012 Some power plant structures in the southeastern portion have been removed; larger ASTs removed by 2014
Industrial 2016 The remainder of the power plant structures in the southeastern portion have been removed; covered stockpiles in the southeastern portion Vacant 2018 Vacant land with power transmission lines, smaller ASTs in the northeastern portion and covered stockpiles in the southeastern portion have been removed Source: Rincon, Phase I ESA, 2025.

PG&E Kern Power Plant
The southern portion of the Project Site was previously developed with the PG&E Kern Power Plant (2401 Coffee Road), which formerly included two natural gas- and oil-burning power generation facilities, petroleum ASTs, and cooling towers. The former PG&E Kern Power Plant was demolished in 2013 and is associated with a closed Cleanup Program case as of 2019, which included soil remediation and groundwater monitoring under the oversight of the Central Valley Regional Water Quality Control Board (CVRWQCB).

A Land Use Covenant (LUC) was recorded for the former power plant site (including the Project Site) and required the preparation of a Soil Management Plan (SMP), which was prepared for the Project area and approved by the CVRWQCB. Based on the soil remediation conducted and residual concentrations of Contaminant of Concern (COCs) in soil and soil vapor at the Project Site below commercial/industrial Water Quality Control Board Environmental Screening Levels (ESLs), the former onsite/southern adjacent power plant is considered a controlled recognized environmental condition (CREC). As concluded in the Phase I ESA, no additional assessment is recommended at the Project Site.

Oil Wells
Four newly “plugged” oil and gas production wells, two previously “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA, the oil wells were plugged and abandoned to current CalGEM standards. As noted in the Well Engineering Report, the original plugging and abandonment of the two wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface.

Confirmation samples were collected and analyzed for Total petroleum hydrocarbons as gasoline (TPH-g), Total petroleum hydrocarbons as diesel (TPH-d), and Total petroleum hydrocarbons as Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-11
motor oil (TPH-o) to confirm that soil remaining onsite did not contain TPH-g, TPH-d, or TPH-o at concentrations in exceedance of commercial/industrial Water Quality Control Board ESLs.

As identified above, a Soil Vapor Report was prepared for the Project Site by Rincon to describe soil vapor sampling activities conducted to evaluate the potential for soil vapor impacts to future commercial site occupants given this historical use of the site and the fact that a portion of the site is located on an oil field. Soil vapor probes were installed on October 21 through 24, 2024 in 31 locations across the site to evaluate every building pad location in the proposed development.

Each soil vapor probe was sampled using a mobile laboratory on October 28 through 30, 2024 and analyzed for VOCs. Neither VOCs nor methane were detected above the laboratory reporting limits in any soil vapor samples collected from the soil vapor probes located in the Project’s proposed building pads or the proposed parking and electric vehicle charging areas on the Project Site during the soil vapor assessment. The Phase I ESA concluded that no additional assessment is recommended as a result of its investigation of the Project Site. The Phase I ESA indicated it has not found evidence that hazardous materials or petroleum products exist at the Project Site at levels that would require mitigation.

Adjacent Oli Refinery
The eastern adjacent property at 2152 Coffee Road previously operated as an oil refinery (Sunland Refining/ World Oil Corp.) and is associated with four open Cleanup Program Site cases, with TPH, VOC, and PFAS impacts to soil, soil vapor, and/or groundwater. Based on the distance to the remaining soil, soil vapor, and groundwater impacts (approximately 980 feet away), this site is considered a de minimis condition with respect to the Project Site. A de minimis condition is defined pursuant to ASTM E1527-21 as, “a condition related to a release that generally does not present a threat to human health or the environment and that generally would not be the subject of an enforcement action if brought to the attention of appropriate governmental agencies. A condition determined to be a de minimis condition is not a recognized environmental condition nor a controlled recognized environmental condition.”

4.9.3 Impact Analysis
Methodology
Potential direct and indirect impacts were identified in part based on a review of the Phase I ESA, Soil Vapor Report, and Well Engineering Report included as Appendix F, as well as other documentation, including the City’s General Plan and Zoning Ordinance and the Kern County and Incorporated Cities Hazardous Waste Management Plan.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance5to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials;
5 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-12
• Create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment;
• Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school; • Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would create a significant hazard to the public or the environment;
• For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area; • Impair implementation of or physically interfere within an adopted emergency response plan or emergency evacuation plan;
• Expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildfires.

Project Impacts
Threshold HAZ-1: Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials?
Impact Analysis
Construction
During construction of the proposed Project, heavy equipment (e.g., dozers, excavators, tractors) would be operated on the Project Site. This heavy equipment likely would be fueled and maintained by petroleum-based substances such as diesel fuel, gasoline, oil, and hydraulic fluid, which are considered hazardous if improperly stored or handled. In addition, materials such as paints, adhesives, solvents, and other substances typically used in building construction would be located on the Project Site during construction.

As such, construction of the Project would involve the transport and use of hazardous materials in the Project area. However, continued compliances with laws, regulations, and policies governing the use of these materials would ensure that Project implementation would not serve to increase public or environmental exposure to hazardous materials. These regulations are detailed above in the regulatory section. In addition, the City’s development review process ensures that land use compatibility as it relates to hazards is examined and enforced in the entitlement process. Further, any future development that would occur under the Project would be subject to environmental analysis by City staff. Therefore, impacts would be less than significant.

Operation
The Project would construct various commercial buildings including a gas station and car wash.

No residential uses are proposed. It is anticipated that the majority of Project operations would involve employing common maintenance and janitorial supplies, such as cleaners and solvents, paints and thinners for site maintenance, and other common chemicals. The limited quantities Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-13
and nature of chemicals used by the Project for the generally commercial uses would not be considered significant.

However, the proposed gas station and car wash would utilize hazardous materials regularly during operations. Gas station operations include the use of gasoline and diesel fuel, which are stored in underground storage tanks (USTs). During refueling, VOCs can be releases as vapors, including benzene, toluene, ethyl-benzene, xylenes, and naphthalene. Often, fuel additives are also utilized at gas stations. Additionally, carbon monoxide and formaldehyde are produced by vehicles at the station. Propane tanks (exchange cages), motor oil, lubricants, battery fluids, and hydraulic fluids can also be released due to the nature of regular uses by automobiles.

However, gas stations are heavily regulated by hazardous materials laws focusing on leak prevention, vapor recovery, and fire safety, overseen primarily by the CUPA, which for this Project, is BFD. Specifically, under HSC Section 25500, businesses must submit inventories of hazardous materials (gasoline, diesel), referred to in the Hazardous Material’s Business Plans (HMBP), to the local CUPA agencies to ensure emergency preparedness. Therefore, the HMBP required for the gas station would be reviewed by BFD. Fueling practices are regulated by Title 8 CCR Section 1594, which prohibits fueling while the engine is running and requires controls for spills. Similarly dispensing units are regulated by Title 8 CCR Section 5573, which requires that dispensers have safe, listed equipment with nozzle-activated controls. Additionally, CARB mandates systems to control gasoline vapors during both tanker deliveries (Phase I) and consumer fueling (Phase II) to protect air quality.

Commercial car washes often result in the discharge of oil, grease, copper, lead, nickel, and zinc in the wastewater. As such, operations of the car wash would be required to comply with hazardous material regulations under federal, state, and local laws, focusing on water protection, chemical handling, and waste disposal. Specifically, the CWA requires that car washes treat or properly dispose of water containing detergents, degreasers, oils, and metal and prohibits discharges into storm drains. Similarly, the Project would be required to comply with the RCRA, which mandates "cradle-to-grave" control over hazardous waste, including oil, sludge, and certain soaps. Additionally, the OHSA Hazard Communication Standard (29 CFR Section1910.1200) requires proper labelling, handling procedures, and worker training for handling chemicals. And finally, operations of the car wash would be required to comply with CCR Title 22, which requires secondary containment for chemicals and specific disposal protocols for car wash sludge.

Moreover, the use of these materials would be in accordance with the manufacturers’ specifications for use, storage, and disposal of such products which have been formulated to avoid substantial exposure hazards. Compliance with applicable federal, state, and local requirements concerning the handling, storage and disposal of hazardous waste would reduce the potential to release contaminants. Therefore, impacts related to the routine transport, use, and disposal of hazardous materials would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-14
Threshold HAZ-2: Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Impact Analysis
Construction
As discussed under Section 4.9.2, Environmental Setting, above, the Phase I ESA determined that there is one CREC in connection with the Project Site, and no additional assessment is recommended at the Project Site. The PG&E Kern Power Plant was formerly present in the southern portion of the Project Site, which was demolished, assessed, and remediated under the oversight of the CVRWQCB. The case was closed on June 3, 2019, with a recorded Land Use Covenant. Additionally, the Project Site had oil wells, which have been plugged and abandoned under CalGEM oversight. Additionally, as identified in the Soil Vapor Report, given the site-wide lack of detections and prior site closure, no further assessment is recommended for soil vapor at the Project Site. As such, no hazards currently exist on the Project Site that could affect construction.

All construction activities would comply with laws, regulations, and policies governing the use of hazardous materials, ensuring that Project implementation would not serve to increase public or environmental exposure to hazardous materials and preventing impacts related to accident or upset conditions. In addition, the City’s development review process ensures that land use compatibility as it relates to hazards is examined and enforced in the entitlement process.

Additionally, BFD, the CUPA for the Project, would also review project plans for consistency with these regulations.

Operation
Project operations would likely involve typical hazardous materials/chemicals such as cleaners, paints, solvents, and fertilizers and pesticides for site landscaping for most of the commercial uses and regular use of hazardous materials during operation of the gas station and car wash.

As previously discussed under Impact HAZ-1, any routine transport, use, and disposal of these materials during Project operations would adhere to federal, State, and local regulations for transport, handling, storage, and disposal of hazardous substances. The car wash and gas station would be required to adhere to regulations specifically designed to contain spills and accidental release, prepare a HMBP, reviewed by BFD as the CUPA, to outline responses to emergencies or accidents. Therefore, with adhere to these mandatory requirements, the Project would not pose a significant threat related to the release of hazardous materials into the environment. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-15
Threshold HAZ-3: Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school?
Impact Analysis
Construction/Operation
The Project Site is located in the Fruitvale School District (FSD), which is located in northwest portion of the City. FSD includes Columbia Elementary, Discovery Elementary, Endeavour Elementary, Quailwood Elementary and Fruitvale Junior High Schools, and has a current TK-grade 8 enrollment of 3,062 students. Specifically, the Project Site is located within the Columbia Elementary School boundary, located at 703 Mondavi Way and approximately 0.89 miles southwest of the Project, and the Fruitvale Junior High School boundary, located at 2114 Calloway Drive and approximately 0.45 miles west of the Project Site.6 The Project Site is also within the school boundaries for Liberty High School, located at 925 Jewetta Avenue and approximately 1.68 miles southwest of the Project Site.7 Liberty High School is part of the Kern High School District (KHSD), which is California’s largest grades 9-12 high school district serving over 42,000 students.8 As such, the Project is not located with 0.25 miles of an existing or proposed school.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold HAZ-4: Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code § 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Impact Analysis
The Cortese List is a planning document used by the State, local agencies and developers to comply with the CEQA requirements in providing information about the location of hazardous materials release sites. This list is published by DTSC. As identified in the Phase I ESA, the Project Site is neither currently on the Cortese List currently or historically. However, as discussed in Section 4.9.2, Environmental Setting, the eastern adjacent property at 2152 Coffee Road previously operated as an oil refinery (Sunland Refining/ World Oil Corp.) and is associated with four open Cleanup Program Site cases, with TPH, VOC, and PFAS impacts to soil, soil vapor, and/or groundwater. However, based on the distance to the remaining soil, soil vapor, and groundwater impacts (approximately 980 feet away), this site is considered a de minimis condition with respect to the Project Site. Accordingly, Project construction and operation would not create a significant hazard to the public or the environment. Impacts would be less than significant. 6 Fruitvale Schools District. 2026. District & School Boundaries Map. Available at:
https://1.cdn.edl.io/zvrE010AY3pDw5rMUmBUuq4ANUtkm0KjJ5o56ghSNFTWFiVT.pdf. Accessed February 2026. 7 Kern High School District. 2025. Kern High School District Attendance Boundaries. Available at:
https://4.files.edl.io/9823/08/13/25/162531-7107f99b-35ca-4dc6-8fae-6b121ea94130.pdf. Accessed February 2026. 8 Kern High School District. 2026. About Us webpage. Available at: https://www.kernhigh.org/apps/pages/aboutus. Accessed February 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-16
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold HAZ-5: For a project located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Impact Analysis
The nearest airport to the Project site is the Meadows Field Airport (BFL), located approximately

3.92 miles to the northeast. The Project site is not located within the he Kern County Airport Land Use Compatibility Plan, Zone C for Meadows Field Airport. As such, the proposed Project is not located within two miles of a public airport, which would result in a safety hazard or excessive noise for people residing or working in the Project area. No impact would occur.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Threshold HAZ-6: Would the project impair implementation of or physically interfere within an adopted emergency response plan or emergency
evacuation plan?
Impact Analysis
According to the California Department of Forestry and Fire Protection (CAL FIRE), the Project Site is not within or in proximity to a Very High Fire Hazard Severity Zone (VHFHSZ). The Project Site is located within a Local Responsibility Area and currently receives fire protection services through a Joint Powers Agreement with BFD and Kern County Fire Department. Calls for service from the Project Site would be addressed by KCFD. No aspect of the Project would prevent the implementation of the Kern MJHMP and Emergency Operations Plan. Construction of the proposed Project would be generally confined to the Project Site and would not physically impair access to the Project Site or the surrounding area. During both construction and long-term operation, the Project would be required to maintain adequate emergency access for emergency vehicles as required by the City, BFD, and KCFD. Furthermore, compliance with the fire code and local ordinances would ensure that the Project would not impair an adopted emergency response plan or emergency evacuation plan. Therefore, the Project would not interfere within an adopted emergency response plan or emergency evacuation plan. No impact would occur.

Mitigation Measure
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-17
Threshold HAZ-7: Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildfires?
Impact Analysis
According to CAL FIRE’s FHSZ viewer, the entire Project Site and surrounding area is designated as LRA. The Project site is identified as having no Fire Hazard Severity Zone (FHSZ) and it is not within or near to a VHFHSZ. The closest FHSZ, both moderate and high, is located in a Local Responsibility Area (LRA) and is approximately 4.29 miles northeast of the Project Site, as the uplands around the Kern River transition to Sequioa National Forest. The nearest VHFHSZ in a State Responsibility Area is located 16.17 miles east of the Project Site. As such, it is anticipated that the KCFD would adequately meet the fire protection demands of the proposed Project.

Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
No impact with no mitigation required.

Cumulative Impacts
Section 3.3, Cumulative Development, identifies projects within an approximately 1.5-mile radius of the Project Site that are planned, under construction, or have been recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to Hazards and Hazardous Materials. For purposes of this analysis, the geographic scope would be the City.

As discussed in this section, the Project site is not located on a hazardous site list compiled pursuant to California Government Code Section 65962.5. The Phase 1 ESA prepared for the Project identified that there is one CREC in connection with the Project Site, and no additional assessment is recommended at the Project Site. The PG&E Kern Power Plant was formerly present in the southern portion of the Project Site, which was demolished, assessed, and remediated under the oversight of the CVRWQCB. The case was closed on June 3, 2019, with a recorded Land Use Covenant. Additionally, the Project Site had oil wells, which have been plugged and abandoned under CalGEM oversight. Additionally, as identified in the Soil Vapor Report, given the site-wide lack of detections and prior site closure, no further assessment is recommended for soil vapor at the site. As such, no hazards currently exist on the Project Site that could affect construction. As with the Project, all related projects identified in Table 3-1 would be required to adhere to applicable federal, State, and local regulations, including the CCR, OHSA, and air quality regulations from CARB and SCAQMD. Therefore, the proposed Project would not combine with other cumulative development projects to result in Hazards and Hazardous Materials impacts; as a result, cumulative impacts would be less than significant.

Mitigation Measures
No mitigation is required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.9 Hazards and Hazardous Materials City of Bakersfield – SCH No. 2025101507 4.9-18
Level of Significance After Mitigation
The proposed Project would not result in significant cumulative impacts associated within hazards or hazardous materials. No mitigation is required.

City of Bakersfield – SCH No. 2025101507 4.10-1

4.10 Hydrology and Water Quality
This section of the Environmental Impact Report (EIR) identifies and analyzes the hydrologic resources available to the Riverview Marketplace Commercial Project (Project) while assessing the potential impact the Project could have on those resources. The existing water and drainage systems serving the Project Site were used to establish a baseline with which to compare potential impacts associated with the Project and will inform the degree of impact that the proposed Project could have on those existing hydrologic systems. Federal, State, regional, and local regulations will provide appropriate context regarding the hydrologic resources of the Project Site and the surrounding area. Impacts in this section are assessed regarding their effects on water quality, groundwater availability, and other hydrological conditions. The analysis also considers the Project’s potential effects in flood, tsunami, and seiche zones.

Information is based in part on the Southwest Corner of Rosedale Highway and Coffee Road, Bakersfield, California Drainage Study, dated July 24, 2025, and Sewer Area Study. Dated May 13, 2026, prepared by Kimley-Horn, and the Water Supply and Demand Analysis for the Coffee and Rosedale Commercial Retail Development Project for the City of Bakersfield, prepared by Placeworks. These studies are included in Appendix I, Utilities and Hydrology, of this Draft EIR.

During the scoping period for the Project EIR, no comments were received in response to the Notice of Preparation (NOP) regarding hydrology and water quality.

4.10.1 Regulatory Setting
Federal
Federal Emergency Management Agency
FEMA administers the National Flood Insurance Program (NFIP) to provide subsidized flood insurance to jurisdictions that comply with FEMA regulations to limit development within floodplains. FEMA also prepares Flood Insurance Rate Maps (FIRMs) to identify areas subject to flooding. These FIRMs provide flood information and identify flood hazard zones. The design standards for flood protection are also established by FEMA. FEMA’s minimum level of flood protection for new development is the 100-year flood event, also described as a flood having a one percent annual chance of occurring.

In addition, FEMA has created requirements and procedures for evaluating earthen levee systems and mapping areas affected by those systems. Levee systems are evaluated for their ability to provide protection from 100-year flood events, with the results documented in the FEMA Levee Inventory System. Levee systems must meet minimum freeboard standards and must be maintained according to an officially adopted maintenance plan. Other FEMA levee system evaluation criteria include structural design and interior drainage.

Clean Water Act
The U.S. Environmental Protection Agency (EPA) serves as the lead federal agency responsible for water quality management. The Clean Water Act (CWA) of 1972 is the primary federal law that governs and authorizes water quality control activities by the EPA and individual states.

Various elements of the CWA address water quality, as described below. Wetland protection elements, including permits to allow for dredge or fill activities, are administered by the United States Army Corps of Engineers (USACE) under Section 404 of the CWA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-2
Under Section 401 of the CWA, applying for a Section 404 permit to discharge dredge or fill material into waters of the United States requires obtaining certification from the appropriate State agency stating that the dredge or fill materials are consistent with the State’s water quality standards and criteria. In California, the authority to grant water quality certification or waive the requirement is delegated by the State Water Resources Control Board (SWRCB) to the nine Regional Water Quality Control Boards (RWQCBs).

Under federal law, the EPA has published water quality regulations within Volume 40 of the Code of Federal Regulations (40 CFR). Section 303 of the CWA requires individual states to adopt water quality standards for all surface waters of the United States. As defined by the CWA, water quality standards consist of two elements: (1) designated beneficial uses of the water body in question and (2) criteria that protect the designated uses. Section 304(a) requires the EPA to publish advisory water quality criteria that reflect the latest scientific knowledge regarding the potential effects on public health and welfare related to the presence of pollutants in water. Where multiple uses exist, water quality standards must protect the most sensitive use. In California, the EPA has designated the SWRCB and its RWQCBs with the authority to identify beneficial uses and adopt water quality criteria.

Safe Drinking Water Act
Under the Safe Drinking Water Act (SDWA) (Public Law 93-523), passed in 1974, the EPA regulates contaminants of concern to domestic water supply. Contaminants of concern relevant to domestic water supply are defined as those that pose a public health threat or that alter the aesthetic acceptability of the water. These types of contaminants are regulated by the EPA’s primary and secondary maximum contaminant levels (MCLs), which are applicable to treated water supplies delivered to a distribution system. MCLs and the process for setting these standards are reviewed once every five years. Amendments to the SDWA enacted in 1986 established an accelerated schedule for setting MCLs for drinking water.

The EPA has delegated to the California Department of Public Health (CDPH) the responsibility for administering California’s drinking-water program. The CDPH is accountable to the EPA for program implementation and for adopting standards and regulations that are at least as stringent as those developed by the EPA. The applicable state primary and secondary MCLs are set forth in Title 22, Division 4, Chapter 15, Article 4 of the California Code of Regulations.

National Pollutant Discharge Elimination System Permit
The National Pollutant Discharge Elimination System (NPDES) permit program was established by the CWA to regulate municipal and industrial discharges to surface waters of the United States from their municipal separate storm sewer systems (MS4s). Federal NPDES permit regulations have been established for a broad range of discharges, including point-source municipal waste discharges and non-point-source stormwater runoff. NPDES permits generally identify effluent and receiving water limits on allowable concentrations and/or mass emissions of pollutants contained in the discharge; prohibitions on discharges not specifically allowed under the permit; and provisions that describe required actions by the discharger, including industrial pretreatment, pollution prevention, self-monitoring, and other activities.

Federal Flood Insurance Program
The U.S. Congress established the National Flood Insurance Program (NFIP) with the passage of the National Flood Insurance Act of 1968. The NFIP is a federal program enabling property owners in participating communities to purchase insurance as protection against flood losses in Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-3
exchange for State and community floodplain management regulations that reduce future flood damages. Participation in the NFIP is based on an agreement between communities and the Federal Government. If a community adopts and enforces a floodplain management ordinance to reduce future flood risk to new construction in floodplains, the Federal Government will make flood insurance available within the community as a financial protection against flood losses. This insurance is designed to provide an insurance alternative to disaster assistance to reduce the escalating costs of repairing damage to buildings and their contents caused by floods. The Federal Insurance and Mitigation Administration (FIMA) within FEMA is responsible for administering the NFIP and administering programs that provide assistance for mitigating future damages from natural hazards.

Executive Order 11988 – Floodplain Management
Executive Order 11988 requires federal agencies to avoid, to the extent possible, the long- and short-term adverse impacts associated with the occupancy and modification of floodplains, and to avoid direct and indirect support of floodplain development wherever there is a practicable alternative. In accomplishing this objective, agencies are to take action to reduce the risk of flood loss, to minimize the impact of floods on human safety, health, and welfare, and to restore and preserve the natural and beneficial values served by flood plains.

State
Porter-Cologne Water Quality Control Act
The Porter-Cologne Water Quality Control Act (Porter-Cologne Act) of 1969 is California’s statutory authority for the protection of water quality. Under the Porter-Cologne Act, the state must adopt water quality policies, plans, and objectives that protect the state’s waters for the use and enjoyment of its residents. The Act requires the SWRCB and its RWQCBs to adopt and periodically update water quality control plans (Basin Plans). Basin Plans are the regional water quality control plans required by both the CWA and the Porter-Cologne Act, in which beneficial uses, water quality objectives, and implementation programs are established for each of the RWQCBs.

The act also requires waste dischargers to notify the RWQCBs of their activities through the preparation of Reports of Waste Discharge and authorizes the SWRCB and its RWQCBs to issue and enforce waste discharge requirements, NPDES permits, Section 401 water quality certifications, and other approval actions.

State Water Resources Control Board (SWRCB)
In California, the SWRCB has broad authority over water quality control issues for the State. The SWRCB is responsible for developing statewide water quality policy and exercises the powers delegated to the State by the federal government under the CWA. Other state agencies with jurisdiction over water quality regulation in California include the California Department of Health Services (CDHS) for drinking water regulations, the California Department of Pesticide Regulation (CDPR), the California Department of Fish and Wildlife (CDFW), and the Office of Environmental Health and Hazard Assessment (OEHHA).

Regional authority for planning, permitting, and enforcement is delegated to the RWQCBs. The regional boards are required to formulate and adopt water quality control plans for all areas in the region and establish water quality objectives in those plans. The proposed Project is within the jurisdiction of the Central Valley RWQCB.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-4
NPDES Permit System and Waste Discharge Requirements for Construction The 1972 amendment to the CWA established the NPDES permit program. The NPDES permit program outlined in the CWA contains effluent limitation guidelines, water quality requirements, and permit program requirements for discharges to waters of the United States. The EPA has overall responsibility for the NPDES program, but administration of the program in California has been delegated to the SWRCB and the nine RWQCBs.

The 1987 amendment to the CWA established a framework for regulating discharges under the NPDES program. In 1990, the EPA promulgated regulations for permitting stormwater discharges from industrial sites, including construction sites that disturb five acres or more, and from municipal separate MS4s serving a population of 100,000 people or more. The November 16, 1990, regulations, known as the Phase I regulations (Title 55 [FR] 47990), rely on NPDES permit coverage to address stormwater runoff from operators of medium and large MS4s, construction activity disturbing five acres of land or greater, and 10 categories of industrial activity.

California Water Code
The California Water Code (CWC) is the principal law regulating water quality in California. Water quality provisions must be complied with as contained in numerous code sections including: 1) the Health and Safety Code for the protection of ground and surface waters from hazardous waste and other toxic substances; 2) the Fish and Game Code for the prevention of unauthorized diversions of any surface water and discharge of any substance that may be deleterious to fish, plant, animal, or bird life; 3) the Harbors and Navigation Code for the prevention of the unauthorized discharge of waste from vessels into surface waters; and 4) the Food and Agriculture Code for the protection of groundwater which may be used for drinking water supplies.

The CDFW, through provisions of the Fish & Game Code (§§ 1601 - 1603), is empowered to issue agreements for any alteration of a river, stream, or lake where fish or wildlife resources may be adversely affected. CDFW regulates wetland areas only to the extent that those wetlands are part of a river, stream, or lake as defined by CDFW (CA Legislative Info, n.d.). Surface water quality is the responsibility of RWQCBs, water supply and wastewater treatment agencies, and city and county governments. The principal means of enforcement by the RWQCBs is through the development, adoption, and issuance of water discharge permits. RWQCB basin plans establish water quality objectives that are defined as the limits or levels of water quality constituents or characteristics for the reasonable protection of beneficial uses of water.

California Toxics Rule
The California Toxics Rule (CTR) fills a gap in California’s water quality standards necessary to protect human health and aquatic life beneficial uses. The CTR supplements and does not change or supersede the criteria that EPA promulgated for California waters in the National Toxics Rule (NTR). The human health NTR and CTR criteria that apply to drinking water sources (those water bodies designated in the Basin Plans as municipal and domestic supply) consider chemical exposure through consumption of both water and aquatic organisms (fish and shellfish) harvested from the water. For waters that are not drinking water sources (e.g., enclosed bays and estuaries), human health NTR and CTR criteria only consider the consumption of contaminated aquatic organisms. The CTR and NTR criteria, along with the beneficial use designations in the Basin Plans and the related implementation policies, are the directly applicable water quality standards for toxic priority pollutants in California waters.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-5
Watershed Management Initiative
The State and Regional Water Boards are currently focused on looking at entire watersheds when addressing water pollution. The Water Boards adopted the Watershed Management Initiative (WMI) to further their goals. The WMI establishes a broad framework overlying the numerous federal and state-mandated priorities. As such, the WMI helps the Water Boards achieve water resource protection, enhancement, and restoration while balancing economic and environmental impacts. The integrated approach of the WMI involves three main ideas:
• Use water quality to identify and prioritize water resource problems within individual watersheds. Involve stakeholders to develop solutions.
• Better coordinate point source and nonpoint source regulatory efforts. Establish working relationships between staff from different programs.
• Better coordinate local, state, and federal activities and programs, especially those relating to regulations and funding, to assist local watershed groups Sustainable Groundwater Management Act
The 2014 Sustainable Groundwater Management Act (SGMA) requires governments and water agencies of high and medium-priority basins to halt overdraft and bring groundwater basins into balanced levels of pumping and recharge. Under SGMA, these basins should reach sustainability within 20 years of implementing their sustainability plans. The DWR categorizes the priority of groundwater basins. For critically over-drafted basins, which will be in 2040. For the remaining high and medium-priority basins, 2042 is the deadline. The SGMA also requires local public agencies and Groundwater Sustainability Agencies (GSAs) in high- and medium-priority basins to develop and implement Groundwater Sustainability Plans (GSPs) or Alternatives to GSPs.

GSPs are detailed road maps for how groundwater basins will reach long-term sustainability. The Valley portion of Kern County in which the Project site is located is managed by the Kern River Groundwater Sustainability Agency (KRGSA), which is comprised of the City of Bakersfield, Kern Delta Water District, and Improvement District No. 4 of the Kern County Water Agency.

Senate Bill 610 (Chapter 643, Statutes of 2001)
The California Water Code (Water Code) §§ 10910 through 10915 were amended by the enactment of SB 610 in 2002. SB 610 requires an assessment of whether available water supplies are sufficient to serve the water demand generated by large development projects, as well as the reasonably foreseeable cumulative demand in the region over the next 20 years under average normal year, single dry year, and multiple dry year conditions. If groundwater is the supply source, the required assessments must include detailed analyses of historic, current, and projected groundwater pumping and an evaluation of the sufficiency of the groundwater basin to sustain a new project’s demands.

Local
Metropolitan Bakersfield General Plan
The Metropolitan Bakersfield General Plan (General Plan), dated December 2002, was updated in January 2016 per Resolution No. 018-16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-6
the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Open Space, Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals, policies, and implementation programs in order to protect the City’s geologic resources and ensure soil stability. The Conservation Element of the Bakersfield Metropolitan General Plan includes the following goals and policies that address hydrology and water quality and are applicable to the Project:

Conservation Element
CON/WR-G-4 Continue cooperative planning for and implementation of programs and projects which will resolve water resource deficiencies and water quality problems.

CON/WR-P-7 Provide substitute or supplemental water resources to areas already impacted by groundwater quality degradation by supporting facilities construction for surface water diversions,
CON/WR-P-8 Consider each proposal for water resource usage within the context of total planning area needs and priorities-major incremental water transport, groundwater recharge, flood control, recreational needs, riparian habitat preservation and conservation.

Safety Element
SAFE/PS-P-13 Determine the liquefaction potential at sites in areas of high groundwater prior to development and determine specific mitigation to be incorporated into the foundation design, as necessary to prevent or reduce damage from liquefaction in an earthquake.

SAFE/PS-G-1 Minimize hazards to planning area residents resulting from flooding.

SAFE/PS-G-2 Reduce the risk of flooding to land uses.

SAFE/PS-G-3 Maintain adequate flood flow capacity in the Kern River channel to prevent flooding from anticipated 100-year design flood flows.

SAFE/PS-P-1 Develop specific standards which apply to development located in flood hazard areas, as defined by Federal Flood Insurance maps and most recent information as adopted by the responsible agency (1-1, 1-2).

SAFE/PS-P-3 Prevent urban development encroachment which would impede flood flows in the Kern River designated floodway (1-3, 1-5).

Public Services and Facilities Element
PSFE/SRMD-G-1 Ensure the provision of adequate storm drainage facilities to protect planning area residents from flooding resulting from stormwater excess.

PSFE/SRMD-P-4 Use drainage area retention basins for drainage disposal when direct discharge to a waterway is not available. Combine storm drainage usage with recreational usage when feasible. Incorporate in such basins recessed areas for off-season retention of nuisance flows. Maintain all basins with Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-7
the primary purpose of drainage disposal, with recreational usage as a secondary objective.

Urban Water Management Planning Act
Through the Urban Water Management Planning Act of 1983, the California Water Code requires all urban water suppliers within California to prepare and adopt a UWMP and to update the plan every five years. This applies to all suppliers providing water to more than 3,000 customers or supplying more than 3,000 acre-feet (af) of water annually. The Act is intended to support conservation and efficient use of urban water supplies at the local level. The Act requires that total projected water use be compared to water supply sources over the next 20 years in five-year increments, that planning occur for single- and multiple dry water years, and that plans include a water recycling analysis that incorporates a description of the wastewater collection and treatment system within the agency’s service area along with current and potential recycled water uses.

4.10.2 Environmental Setting
Hydrology
The Project Site is “L”- shaped, with the northern property line bordering Rosedale Highway and the eastern property line bordering Coffee Road. The eastern portion of the site is bound by a gravel-paved staging/storage area to the south and a PG&E substation/Kern Power Plant to the west. The western portion of the site is bound by El Toro Viejo Road and a fast-food restaurant at the corner of El Toro Viejo Road and Rosedale Highway to the west, and the PG&E substation/Kern Power Plant to the south. The site is predominantly undeveloped, with the eastern portion being used as a staging/storage area; large power poles and electrical lines cross the middle of the site, spanning from the PG&E substation to Rosedale Highway, and two tank structures within the northeastern portion of the site that are surrounded by a chain link fence.

The ground surface is predominantly soil with some small weeds spread across the site and gravel access/staging areas within the eastern portion of the site. Within the western third of the site are 5- to 8-foot-high raised access roads that appear to have been created to access oil pump jacks.

The current USGS topographic map (Oildale Quadrangle 2022) indicates that the Project Site is situated at an elevation of approximately 390 feet above mean sea level, with topography sloping gently down to the west. The adjacent topography consists of relatively flat land.

Flood Hazard
The Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM) for the Project area shows the Project Site being covered by one map panel, 06029C1825F. 1 The entirety
of the Project Site is classified as Zone X, an area noted as having a minimal flood hazard. The Project is not located near any dams, reservoirs, or large water bodies.

Water Quality
The U.S. Geological Survey defines water quality as “a measure of the suitability of water for a particular use based on selected physical, chemical, and biological characteristics."2 This can be 1 Federal Emergency Management Agency (FEMA),2023. Flood Insurance Rate Map. Available at:
https://msc.fema.gov/arcgis/rest/directories/arcgisjobs/nfhl_print/mscprintb_gpserver/j2c884ebb19b942098395a380957e7568/scratch/FIR METTE_56ca9c51-79a2-4cd0-8907-d7577bde9f8f.pdf. Accessed May 2026. 2 U.S. Geological Survey, Water Quality Information by Topic. Available at: https://www.usgs.gov/special-topics/water-science-school/science/water-quality-information-topic. Accessed May 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-8
determined by the quantity of undesired constituents or pollutants in the water and their characteristics. Typical pollutants associated with construction would include sediments from disturbing soils, fuels, lubricants, and liquid waste. From operations, typical pollutants would include cleaning solvents, pesticides from landscaping, and petroleum products. While some level of constituents may be acceptable for certain uses (e.g., dust mitigation on a construction site) it may be unsuitable for others (e.g., drinking water). In an urban environment, the quantity of certain pollutants in the stormwater systems is generally associated with the type and intensity of the land use. Highly urban land uses will produce different and varying quantities of pollutants than rural land uses.

The Project Site is currently undeveloped and is currently vacant, so there is no activity on site.

Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA, the oil wells were plugged and abandoned to current CalGEM standards. As noted in the Well Engineering Report, the original existing plugging and abandonment of both wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface.

Accordingly, there is less potential for the introduction of certain pollutants into the surrounding environment.

Groundwater
The City pumps groundwater and recharges surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically overdrafted and identified as a high-priority basin by the California Department of Water Resources (DWR). It is not currently adjudicated.

The City, along with five other agencies, is a member of the Kern River Groundwater Sustainability Agency (KRGSA) which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County GSP which was adopted by DWR in December of 2024.

The City’s Water Resources Department operates a Domestic Water System and a Wholesale Water System. The primary source of supply for the Domestic Water System, a retail water supplier that operates under a service contract with California Water Service (Cal Water), is groundwater and recharged surface water pumped from city-owned wells. This is supplemented by surface water supplies from treatment plants owned by Cal Water and Kern County Water Agency Improvement District No. 4’s (KCWA ID4).

4.10.3 Impact Analysis
Methodology
Southwest Corner of Rosedale Highway and Coffee Road, Bakersfield, California Drainage Study and Sewer Area Study (Drainage Study and Sewer Area Study, respectively), prepared by Kimley-Horn, and Water Supply and Demand Analysis (WSA), prepared by Placeworks, have been prepared for the Project and are included in Appendix I. The Drainage Study (See Appendix I-2) was prepared consistent with the City of Bakersfield Hydrology Manual and utilizes City Standards for determining sizing of stormwater basin(s) on the Project Site by analyzing the Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-9
volume from a 100-year, 24-hour storm event to determine retention basin requirements, size the basins to be able to retain the volumes while provided the required one inch of freeboard, and size the pipes to adequately convey the 100-year peak flow rate obtained from the rational method.

Similarly, the Sewer Area Study (Appendix I-3) calculates remaining downstream sewer capacity for the Project and utilizes City Standards for determining existing and proposed sewer flow by monitoring existing sewer manholes to determine existing peak dry weather flows, quantifying the proposed flows from the Project based on City sewer generation rates, quantifying sewer flows from future downstream projects, and analyzing critical sewer segments for available capacities post project completion.

The WSA (Appendix I-1) assesses the adequacy of water supplies to meet the Project’s water demand in addition to future water demands within the City of Bakersfield’s service area. The analysis documents whether the City’s total projected water supplies for normal, single dry, and multiple dry water years over a 20-year period will meet the proposed project’s projected water demand as well as future service area demands.

To establish existing conditions, several data sources were consulted, including FEMA, the National Oceanic and Atmospheric Administration (NOAA) Atlas, the United States Department of Agriculture (USDA) Natural Resources Conservation Service web soil survey, the SWRCB, the California Geological Survey, the RWQCB, and City documents. To identify potential impacts, the Project was compared to existing conditions and then evaluated for potential impacts per the significance thresholds identified below.

To identify potential impacts related to flood hazards the FEMA FIRMette was used to identify the Project Site relative to flood zones, and geographical analysis was employed to identify the Project Site relative to bodies of water with flooding potential. To identify potential impacts related to tsunamis, the California Geological Survey Tsunami Mapper application was employed to identify the Project site relative to tsunami zones. To identify potential impacts related to seiche, geographic analysis was employed to identify the Project Site’s location relative to large standing bodies of water. Finally, applicable water quality control plans and federal, State, and local regulations and plans were evaluated to determine whether the proposed project would violate any applicable regulations or standards.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality;
• Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin;
3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-10
• Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
▪ Result in substantial erosion or siltation on- or off-site; ▪ Substantially increase the rate or amount of surface in a manner which would result in flooding on- or off-site;
▪ Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff;
▪ Impede or redirect flood flows;
• In flood hazard, tsunami, or seiche zones, risk of release of pollutants due to project inundation; or
• Conflict with or obstruct the implementation of a water quality control plan or sustainable groundwater management plan.

Project Impacts
Threshold HWQ-1: Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or ground water quality?
Impact Analysis
Construction
Construction of the Project would include site preparation and other earthwork activities that have the potential to result in erosion on and adjacent to the Project site. If erosion is not prevented or contained, sediments and particulates, along with any contaminants found within, could potentially be conveyed offsite and into downstream waters, causing water quality degradation and the subsequent violation of water quality standards. Additionally, disturbed soils have an increased potential for fugitive dust to be released into the air and carried offsite. The Project would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling, and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies Best Management Practices (BMPs) to prevent construction pollutants from moving offsite. According to the State Water Resources Board, the Project is required to comply with the General Permit because project-related construction activities would disturb at least one acre of soil.

The City owns and maintains a municipal separate storm sewer system (MS4). The Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board (CVRWQCB) National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer Systems (Order No. R5-2016-0040; NPDES No. CAS0085324) (MS4 Permit). The MS4 Permit mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the city because of operational stormwater discharges throughout the City, including the project site. By complying with the General Permit and MS4 Permit, the project Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-11
would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.

Operations
During operation, the Project would not involve storage of substantial hazardous materials on-site. Potential pollutants would be typical of commercial development, such as cleaning solvents and pesticides for landscaping. Stormwater, including runoff from the proposed building and designated parking areas, could carry pollutants into public storm drains during operations.

The City owns and maintains a municipal separate storm sewer system (MS4). The Project’s operational urban stormwater discharges are covered under the Central Valley Water Quality Control Board (CVRWQCB) National Pollutant Discharge Elimination System Permit and Waste Discharge Requirements General Permit for Discharges from Municipal Separate Storm Sewer Systems (Order No. R5-2016-0040; NPDES No. CAS0085324) (MS4 Permit). The MS4 Permit mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the city because of operational stormwater discharges throughout the City, including the project site. By complying with the General Permit and MS4 Permit, the project would not violate any water quality standards or waste discharge requirements, and impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold HWQ-2: Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Impact Analysis
As discussed above, the City operates both a Domestic Water System and a Wholesale Water System. The water supply sources for the Domestic Water System are groundwater and recharged surface water supplies pumped from City owned wells and treated surface water from two water treatment plants. The WSA prepared for the Project analyzed the Project’s impact on the Domestic Water System because it is the water available for municipal supply within the Project area. The 2020 City’s Domestic Water System’s water supply was approximately 74 percent groundwater, 25 percent surface water, and one percent recycled water.

The WSA (Appendix I) includes projections for 2025 through 2040 that show that the City’s Domestic Water System will be able to meet demands with projected supplies under normal and drought conditions. Water demand would increase from 52,430 acre feet per year (afy) in 2025 to 63,834 afy in 2030 under normal conditions and would increase from 42,662 afy to 46,642 afy for the fifth consecutive drought year. The water use projections have not been adjusted to account for future water savings from codes, standards, or ordinances, or transportation and land use plans and are therefore very conservative.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-12
The Project’s water demand at Project buildout in 2027 is anticipated to be 166.8 afy, which amounts to less than one percent of the City’s total water demand for normal-year conditions for the year 2030. Further, the City’s Urban Water Management Plan (UWMP) projects an increase in water demand of 9,224 afy from 2020 to 2030. More specifically, the water demand for the commercial land use sector would increase by 1,876 afy from 2020 to 2030. The estimated Project water demand of 166.8 afy is only 8.9 percent of the increase in demand for the commercial land use sector and thus is accounted for in the UWMP as part of the future development in the City.

Moreover, as noted in the WSA, the City can also increase the use of its groundwater wells during years of reduced Kern River supplies. The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would further reduce water demands by 10 to 15 percent during drought conditions. Therefore, as concluded in the WSA, the Project’s Domestic Water System can adequately meet the Project's demand without depleting groundwater or affecting its overall quality. Accordingly, the Project would not significantly impact local groundwater recharge or impede sustainable groundwater management of the basin. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required Threshold HWQ-3a: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would result in substantial erosion or siltation on- or off-site?
Impact Analysis
The Project Site does not currently contain any streams or rivers that would be impacted by the implementation of the Project. As discussed in the Hydrology Study (see Appendix I), under existing conditions, the Project Site ground surface is predominantly soil with some small weeds spread across the site and gravel access/staging areas within the eastern portion of the site.

Within the western third of the site are 5- to 8-foot-high raised access roads.

As discussed under Threshold HWQ-1, the Project would be required to comply with the NPDES General Permit for stormwater discharges. Construction activities subject to the General Permit include clearing, grading, stockpiling, and excavation. To conform to the requirements of the General Permit, a SWPPP would need to be prepared that specifies BMPs to prevent construction pollutants from moving offsite, as well as establish measures to reduce the potential for erosion.

Implementation of the Project would involve approximately 1,656,775 square feet of impervious area and approximately 426,810 square feet of pervious area, resulting in an impervious ratio of

0.8. However, the Project proposes to implement a retention basin as well as multiple catch basins that would be sized to adequately treat runoff water from the Project site as shown in the Drainage Study. As such, the Project would not result in on-site and off-site erosion and siltation. Impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-13
Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold HWQ-3b: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or off-site? Impact Analysis
Per the FEMA FIRMette for the proposed Project area, the Project site is located within Zone X, which denotes an area with reduced flood risk. While upon completion of construction, the amount of impervious surface on the Project Site would be increased when compared to existing conditions, the Project’s drainage facilities would be designed to ensure that all on- and off-site drainage and storm drain facilities would be adequately sized to accommodate runoff from storm events consistent with the recommendations included in the Drainage Study (Appendix I-2).

Furthermore, the proposed drainage design would be reviewed and approved by the City to ensure that the Project does not result in increased flows off-site or otherwise significantly impact downstream drainage facilities. Additionally, the proposed Project would not alter the course of a stream or river that would result in flooding. Accordingly, the proposed development would not cause additional flooding or substantial runoff, exceed the capacity of existing drainage facilities, or impede or redirect flood flows such that on-site or off-site areas are significantly impacted.

Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact with no mitigation required.

Threshold HWQ-3c: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? Impacts Analysis
The Project would include the addition of impervious surfaces as well as on-site stormwater infrastructure that would be sized to meet the drainage needs of the Project. As discussed in the Sewer Area Study (Appendix I-3), upon completion of construction, Project sewer flows will be conveyed on-site through an underground sewer main of various sizes, generally from east to west, connecting to the existing 36-inch City sewer main in El Toro Viejo Road. The City sewer Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-14
main traverses south across a vacant parcel, turns west on Brimhall Road, and continues to Jewetta Avenue where it increases in size to 42 inches and turns south. The 42-inch main continues south across the Kern River and increases in size to a 48-inch main at Bolthouse Drive.

The 48-inch main continues south on Buena Vista Road until it turns east at McCutchen Road.

The sewer main continues east to the sewer lift station located at the southeast corner of McCutchen Road and Gosford Road. As concluded in the Sewer Area Study, the Project contributes only two percent of the existing flows and one percent of the cumulative flows.

Therefore, the Project’s impact on the City sewer is an insignificant addition to the downstream system.

Additionally, the Project’s operational urban stormwater discharges are covered under the CVRWQCB MS4 Permit, which mandates the implementation of a stormwater management framework to ensure that water quality is maintained within the City because of operational stormwater discharges throughout the City, including the Project site. By complying with the General Permit and MS4 Permit, the Project would not cause substantial additional sources of polluted runoff or overwhelm the existing stormwater and sewer infrastructure. Accordingly, impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Threshold HWQ-3d: Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would impede or redirect flood flows?
Impact Analysis
The Project would include a detention basin on the northern portion of the Project Site that would be fenced and screened with landscaping. The Project would not alter the course of a stream or river and would not substantially increase impervious surface in a manner that would result in impediments to or redirection of flood flows. The Project site is located within FEMA Zone X, which denotes an area with reduced flood risk. Even in the event of a flood, the proposed Project would not introduce new structures or surfaces that would substantially affect flood waters. Any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-15
Threshold HWQ-4: Would the project if in flood hazard, tsunami, or seiche zones, risk the release of pollutants due to project inundation?
Impact Analysis
The Project site is not located within a floodplain. There are no nearby levees that would be susceptible to failure or flooding of the site. The Project site, like most of the city, is located within the Lake Isabella flood inundation area, which is the area that would experience flooding in the event that there was a catastrophic failure of the Lake Isabella Dam. There is an approved Lake Isabella Dam Failure Evacuation Plan that establishes a process and procedures for the mass evacuation and short-term support of populations at risk below the Lake Isabella Dam. The City would utilize the evacuation plan to support its Emergency Operations Plans (EOPs). With the implementation of the evacuation plan, the Project would not expose people or structures to a significant risk of loss, injury, or death involving flooding, including flooding as a result of the failure of a levee or dam. Accordingly, the proposed Project is not within a zone with risk of seiche, and there is minimal risk of release of pollutants due to seiche-related project inundation. Impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required Threshold HWQ-5: Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan? Impact Analysis
The City pumps groundwater and recharges surface water from the Kern County Subbasin, which is part of the larger San Joaquin Valley Groundwater Basin. The Kern County Subbasin is designated as critically over drafted and identified as a high-priority basin by the DWR. It is not currently adjudicated.

The City, along with five other agencies, is a member of the KRGSA which covers approximately 232,499 acres of land overlying the Kern County Subbasin. The KRGSA was formed in compliance with the Sustainable Groundwater Management Act to cooperatively manage local groundwater in a sustainable manner. KRGSA, along with other GSAs within the Kern County Subbasin, collectively submitted the Draft Kern County GSP which was adopted by DWR in December of 2024. The GSP aims to maintain water levels above the Minimum Threshold levels to allow the City’s wells to meet the demands of the Domestic Water System while minimizing undesirable results such as declining pump capacity, well inefficiency, water levels falling below pump intakes and pump screens, and degraded water quality. The City’s groundwater operations are subject to compliance with the requirements of the GSP.

Optimization of the City’s Kern River supplies to promote the goals of the GSP involves the full use of the City’s available Kern River entitlement. The Kern River Conjunctive Use Optimization project would be implemented over time so that it can be adjusted to meet changing conditions.

The City’s Kern River supplies would be delivered as a first priority to meet demands of the surface water treatment plants, with the remaining supplies being recharged to the groundwater basin through the Kern River channel, the 2,800-acre recharge facility, Truxtun Lake, and other City Riverview Marketplace Commercial Project
Environmental Impact Report 4.10 Hydrology and Water Quality City of Bakersfield – SCH No. 2025101507 4.10-16
park facilities. Additional Kern River supplies may become available to the City through an Application to Appropriate Water filed with the SWRCB. As noted in the WSA (Appendix I-1) prepared for the proposed Project, the City can increase use of their groundwater wells during years of reduced Kern River supplies. The City’s Kern River supplies replenish the groundwater basin to provide reliability of groundwater supplies for a five-year drought. In addition, water conservation efforts accomplished by implementing the Water Shortage Contingency Plan would result in reductions in water demands by 10 to 15 percent during drought conditions. The proposed Project would not result in substantial degradation of water quality or drawdown of groundwater supplies and would not conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan. Therefore, this impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

Cumulative Impacts
Impact Analysis
All the proposed projects in the area would be subject to State and local water quality regulations, whose robustness is sufficient to ensure that the combined water quality effects of each project would not be cumulatively considerable. With respect to construction operations, projects would comply with the State’s NPDES Construction General Permit, requiring implementation of a stormwater pollution prevention plan during construction activities. During operation, no project would directly discharge stormwater into receiving waters. Rather, on-site runoff would be treated in bio-retention basins prior to entering the downstream system. Therefore, cumulative impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant impact. No mitigation is required.

City of Bakersfield – SCH No. 2025101507 4.11-1

4.11 Land Use and Planning
This section discusses the potential land use and planning impacts associated with the Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the proposed Project’s potential to physically divide an established community and/or cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. This analysis is based on a review of the relevant regulatory setting, existing conditions, and a discussion of the thresholds used to determine whether a Project would result in significant impacts to land use and planning.

Information in this section is based, in part, on the Metropolitan Bakersfield General Plan (General Plan) and the City of Bakersfield (City) Municipal Code (BMC) Title 17(Zoning Ordinance).

During the scoping period for the Project’s Environmental Impact Report (EIR), comments were received regarding potential issues related to urban decay.

4.11.1 Regulatory Setting
Federal
There are no federal regulations related to land use and planning applicable to the Project.

State
State Planning and Zoning Law
California’s planning law (California Government Code [Gov Code] Section 65300) requires every city and county in California to adopt a comprehensive, long-term general plan for physical development of a city or county. A general plan should consist of an integrated and internally consistent set of goals and policies that are grouped by topic into a set of elements and are guided by a citywide vision. The mandatory elements for all jurisdictions are land use, circulation, housing, conservation, open space, noise, and safety. Cities and counties in the San Joaquin Air Pollution Control District must also address air quality in their general plans. Cities and counties that have identified disadvantaged communities must also address environmental justice in their general plans, including air quality.

Additionally, each of the specific and applicable requirements in the state planning law should be examined to determine if there are environmental issues within the city that a general plan should address.

California’s zoning law (Gov Code Section 65800) requires every county and city in California to adopt regulatory ordinances that dictate site-specific land use, building heights, set-backs, and density. The zoning law also requires that county or city zoning ordinances be consistent with the general plan of the county or city and that a zoning ordinance be amended within a reasonable time so that it is consistent with the general plan in the event that the ordinance becomes inconsistent with the plan by reason of amendment to the plan. While Government Code Section 65700 provides a general exemption for charter cities with a population under 2 million, the City of Bakersfield has committed by Resolution
Assembly Bill 72 (2017) HCD Oversight
Assembly Bill (AB) 72 strengthens the ability of the California Department of Housing and Community Development (HCD) to enforce housing laws that require local governments to Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-2
achieve housing goals. Specifically, it requires HCD to review any action or failure to act by a local agency that it determines is inconsistent with an adopted housing element and to issue findings whether the action or failure to act substantially complies with the housing element. Under AB 72, HCD can find a jurisdiction out of compliance with state housing law at any time. HCD may review local government’s actions and inactions, including program actions committed within an adopted housing element, to determine consistency or inconsistency with state housing law. If HCD makes findings of inconsistency, housing element compliance may be revoked and additional actions may be taken, including referral to the Attorney General’s Office. 1 Assembly Bill 1397 (2017) Residential Development Inventory Assembly Bill (AB) 1397 adds to existing law that requires jurisdictions to include an inventory of land suitable for residential development in their housing elements, including vacant sites and sites having the potential for redevelopment. Under AB 1397, housing element law is strengthened by limiting the reliance of local governments on sites that do not have a realistic capacity for development of housing. Specifically, AB 1397 makes changes to the definition of land suitable for residential development to increase the number of sites where new multifamily housing can be built. It requires the inventory of land to be available for residential development in addition to being suitable for residential development and to include vacant sites and sites that have "realistic and demonstrated potential for redevelopment during the planning period to meet the locality's housing need for a designated income level."2 Senate Bill 166 (2017) “No Net Loss” Law
Senate Bill (SB) 166 (Gov Code Section 65863) was adopted to ensure development opportunities remain available throughout the planning period to accommodate a jurisdiction’s regional housing need allocation (RHNA), especially for lower- and moderate-income households.

Under SB 166, a jurisdiction must maintain adequate sites to accommodate its remaining, unmet RHNA by each income category at all times throughout the entire planning period. It may not take any action to reduce a parcel’s residential density unless it makes findings that the remaining sites identified in its Housing Element sites inventory can accommodate the jurisdiction’s remaining unmet RHNA by each income category, or if it identifies additional sites so that there is no net loss of residential unit capacity. It requires jurisdictions that approve a development of a parcel identified in its Housing Element sites inventory with fewer units than shown in the Housing Element, it must either make findings that the Housing Element’s remaining sites have sufficient capacity to accommodate the remaining unmet RHNA by each income level or identify and make available sufficient sites to accommodate the remaining unmet RHNA for each income category.

SB 166 also prevents a jurisdiction from disapproving a housing project on the basis that approval of the development would trigger the identification or zoning of additional adequate sites to accommodate the remaining RHNA.3
Office of Land Use and Climate Innovation
The Governor’s Office of Land Use and Climate Innovation (LCI) is responsible for the State’s long-range planning and research and constitutes the comprehensive State planning agency. The 1 Holland & Knight. A Closer Look at California’s New Housing Production Laws. Available at:
https://www.hklaw.com/files/Uploads/Documents/Articles/WhitePaper/CaliforniasNewHousingProductionLaws.pdf. Accessed March 2026.
2 Ibid.
3 California Department of Housing and Community Development. 2019. No Net Loss Law Government Code Section 65963. Available at: https://www.hcd.ca.gov/community-development/housing-element/housing-element-memos/docs/sb-166- final.pdf. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-3
LCI is responsible for the formulation of long-range land use goals and policies, the management of State planning grants, and the encouragement of local and regional planning. It also creates and adopts General Plan Guidelines as well as the CEQA Guidelines (for adoption by the Secretary of Natural Resources). LCI is also responsible for operating the State Clearinghouse for distribution and review of CEQA documents.4 Prior to July 1, 2024, this agency was referred to as the Governor’s Office and Planning and Research.

Urban Decay Analysis
CEQA Guidelines Section 15131 states that “[e]conomic or social information may be included in an EIR or may be presented in whatever form the agency desires.” While economic and social effects of a project are not treated as significant effects on the environment, “[a]n EIR may trace a chain of cause and effect from a proposed decision on a project through anticipated economic or social changes resulting from the project to physical changes caused in turn by the economic or social changes (14 CCR Section 15131(a)). In turn, social or economic effects of a project may be used to determine the extent of any physical changes caused by the project (14 CCR Section 15131(b)).

The physical manifestation of a project’s socioeconomic impact is referred to as “urban decay.” (See Bakersfield Citizens for Local Control v. City of Bakersfield (2004) 124 Cal.App.4th 1184.) As it relates to commercial retail projects, a variety of factors are considered when determining whether an analysis of this indirect impact is warranted under CEQA, including project size, its proximity to other shopping opportunities and the anticipated type of retailers and their market areas. (Id. at p. 1207.) Essentially the questions to be resolved when analyzing urban decay are:
1) will the proposed project cause the closure of existing retail establishments; and 2) would closure(s) result in extended vacancies that cause physical changes defined as urban decay.

Regional
Local
Metropolitan Bakersfield General Plan
The General Plan, dated December 2002, was updated in January 2016 per Resolution No. 018- 16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it had not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Housing; Open Space: Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies related to land use and planning:

Land Use Element
LAND/GEN-G-1 Accommodate new development which captures the economic demands generated by the marketplace and establishes Bakersfield’s role as capital of the southern San Joaquin Valley.
4 California Governor’s Office of Land Use and Climate Innovation. 2026. About Us, Responsibilities webpage. Available at:
https://lci.ca.gov/about/responsibilities.html. Accessed March 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-4
LAND/GEN-G-2 Accommodate new development which provides a full mix of uses to support its population.

LAND/GEN-G-3 Accommodate new development which is compatible with and complements existing land uses.

LAND/GEN-G-4 Accommodate new development which channels land uses in a phased, orderly manner and is coordinated with the provision of infrastructure.

LAND/GEN-G-6 Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards.

LAND/GEN-G-7 Establish a built environment which achieves a compatible functional and visual relationship among individual buildings and sites.

LAND/GEN-G-8 Target growth companies that meet clean air requirements and create sustainable employment in jobs paying higher wages.

LAND/CD-P-15 Allow for the development of a variety of commercial centers/corridors which are differentiated by their function, intended users and level of intensity, including convenience centers serving local residential neighborhoods, sub-regional centers which serve groupings of neighborhoods, and major regional centers which serve the planning area and surrounding areas.

LAND/CD-P-16 Allow for the development of a variety of commercial uses, including those which serve residents (groceries, clothing, etc.), highway users, and tourists-visitors.

LAND/CD-P-18 Require all new commercial designations be assigned to sites where the aggregate of all contiguous parcels designated for commercial use is no less than five (5) acres, except for approved specific plans, parcels to be developed for highway-oriented service uses at freeway on- and off-ramps, or where physical conditions are such that commercial is the only logical use of the property.

LAND/CD-P-19 Allow for the intensification and development of existing commercial areas in an infill fashion.

LAND/CD-P-20 The depth of new commercial developments shall be at least half the length of the street frontage. Exceptions may be made where existing development or physical constraints provide a more logical shape.

LAND/CD-P-24 Encourage the clustering of commercial development in compact areas, rather than extended along streets and highways.

LAND/CD-P-25 Provide for infill of commercial land uses to be compatible with the scale and character of existing commercial districts and corridors.

LAND/CD-P-26 Encourage adjacent commercial uses to be of compatible height, setback, color and materials.

LAND/CD-P-28 Require that commercial development provide design features such as screen walls, landscaping and height, setback and lighting restrictions Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-5
between the boundaries of adjacent residential land use designations so as to reduce impacts on residences due to noise, traffic, parking, and differences in scale.

LAND/CD-P-30 Street frontages along all new commercial development shall be landscaped.

LAND/CD-P-30.A Require new large retail commercial development projects to evaluate decay impacts on existing commercial uses as set forth in the implementation measures.

LAND/CD-P-30.B Require perimeter street(s) around new commercial office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and vehicular access from adjacent residential neighborhoods or promote convenient access to public transit services, and where anticipated traffic will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist that create a logical separation between the uses, or to encourage infill development.

LAND/GEN-P-76: Provide for a mix of land uses which meets the diverse needs of residents; offers a variety of employment opportunities; capitalizes, enhances, and expands upon existing physical and economic assets; and allows for the capture of regional growth.

LAND/GEN-P-78: Accommodate new projects which are infill or expansion of existing urban development.

LAND/GEN-P-79: Provide for an orderly outward expansion of new "urban" development (any commercial, industrial, and residential development having a density greater than one unit per acre) so that it maintains continuity of existing development, allows for the incremental expansion of infrastructure and public services, minimizes impacts on natural environmental resources, and provides a high quality environment for living and business.

LAND/GEN-P-81: Allow for flexibility in the specific siting of multi-family residential and commercial uses from the locations generally depicted on the Land Use Map in areas which are undeveloped, used for resource production, or are developed at very low densities through Planned Unit Development, Planned Commercial Developments and Specific Plans, provided that:
a) The overall density and distribution of land uses is maintained; b) Multi-family and commercial uses are located in proximity to principal roadways, public transit, employment nodes, commercial services, and recreational uses and within 330 feet of the location depicted on the Land Use Policy Map;
c) Uses are sited to take advantage of pedestrian greenbelts, recreational amenities, and natural environmental resources; d) The availability of infrastructure to the site or adjacent service areas is not adversely impacted.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-6
LAND/GEN-P-85: Encourage the revitalization of deteriorated land uses and buildings.

LAND/GEN-P-86: Encourage infill of vacant parcels.

City of Bakersfield Housing Element
The Housing Element is the City’s eight-year blueprint (2023-2031) for meeting the housing needs of the community. The Housing Element provides a coordinated strategy for preserving the City’s existing housing stock and advancing opportunities for new housing in a way that enhances quality of life and equitable access to resources. It also serves as a strategy to address housing needs across the economic and social spectrum, reflecting the needs of a diverse community.

Meeting current and projected housing needs ensures that the City can accommodate its share of the RHNA. The Housing Element identifies constraints to housing production as well as policies and actions to help overcome these constraints.

City of Bakersfield Land Use Zoning Ordinance
The City’s Zoning Ordinance is included in Title 17 of the Bakersfield Municipal Code. The Zoning Ordinance implements the goals and policies of the General Plan, which serve to promote and protect the public health, safety, peace, morals, comfort, convenience, and general welfare. The Zoning Ordinance assists in providing a definite plan of development for the City and to guide, control and regulate the future growth of the City in accordance with the General Plan. The Zoning Ordinance also is intended to protect the established character and the social and economic stability of agricultural, residential, commercial, industrial and other areas within the City, and to assure the orderly and beneficial development of such areas.

Bakersfield Municipal Code
The Project Site is zoned M-2 General Manufacturing whereby Chapter 17.30 of the BMC sets out the regulations that apply to the M-2 general manufacturing zone unless otherwise specified.

The BMC includes hierarchical rights where higher-intensity zones automatically allow lower-intensity uses. The M-2 Zone allows any uses permitted in the M-1 Zone: Section 17.28.020(A) M-1 Light Manufacturing Zone, allows uses permitted in the C-O (Professional and Administrative Office), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zones; provided, however, that no building shall be used as a dwelling except accessory buildings which are incidental to the permitted use of the land, and that no building shall have a dwelling unit except when such use as a dwelling unit is incidental to the primary use of the building.

M-2 GENERAL MANUFACTURING ZONE

17.30.020 Uses Permitted. Any use permitted in the M-1 zone; However, no building shall be used as a dwelling except accessory buildings which are incidental to the permitted use of the land, and that no building shall have a dwelling unit except when such use as a dwelling unit is incidental to the primary use of the building.

17.30.035 Additional requirements.

A. All permitted and conditional uses pursuant to this chapter shall be subject to site plan review as provided in Chapter 17.08 of this code.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-7
B. Landscaping shall be subject to the requirements of Chapter

17.61 of this code.

C. Off-street parking and loading shall be subject to the requirements of Chapter 17.58.

D. Signs shall be subject to the requirements of Chapter 17.60 of this code.

E. Industrial and/or commercial development proposed adjacent to property zoned or designated for residential development shall be required to be separated by a solid masonry wall constructed a minimum height of six feet from highest grade. Any wall located within or along the front yard area shall not exceed a height of four feet. Along street frontages, landscaping shall be required in lieu of or in combination with a solid wall, as determined by the development services director, to screen the proposed development from the residential uses.

17.30.040 Building height. Building height in an M-2 zone shall be thirteen stories and shall not exceed one hundred fifty feet.

17.30.050 Front yard. Front yard requirements in an M-2 zone shall be as follows:

A. All buildings shall be located a minimum of ten feet from the front property line.

17.30.060 Side yard. Side yard requirements in an M-2 zone shall be as follows:

A. Where the lot abuts any R, MH zone, or PUD project of a residential nature, there shall be a side yard of not less than twenty feet.

B. On a corner lot, the side yard on the street side of the lot shall be not less than ten feet.

C. In all other cases, a side yard shall not be required.

17.30.070 Rear yard. Rear yard requirements in an M-2 zone shall be as follows:

A. Where the lot abuts any R, MH zone, or PUD project of a residential nature, there shall be a rear yard of not less than twenty feet.

B. Where there is an alley at the rear of the lot, such rear yard may be measured to the center of the alley.

C. In all other cases, a rear yard shall not be required.

17.30.080 Minimum lot area. There shall be no minimum lot area in an M-2 zone.

17.30.090 Distance between buildings on the same lot. There shall be no distance requirements between buildings on the same lot in an M-2 zone.

4.11.2 Environmental Setting
The Project Site is located the northwestern portion of the City. The Project Site is an approximately 46.16-acre undeveloped L-shaped property situated along the south side of Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-8
Rosedale Highway (CA-58), north of the railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. The Project Site is currently secured on all sides by six-foot-tall chain-link fencing, with vehicular access provided via gated unpaved entry drives along Coffee Frontage Road and one concrete paved driveway along Rosedale Highway. Existing onsite features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Nearby uses include Rosedale Highway and a commercial retail center (Northwest Promenade), to the north; a Pacific Gas & Electric (PG&E) electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east.

The General Plan land use designation of the Project Site is P (Public Facilities). The Project Site is zoned M-2 (General Manufacturing). The Project applicant is seeking an amendment to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses are permitted under the commercial designations. Therefore, to proceed with the Project and its proposed uses and to provide consistency with the Project Site’s M-2 zoning designation, the LI designation has been determined to be the appropriate land use designation.

4.11.3 Impact Analysis
Methodology
Potential impacts to land use and planning were evaluated by identifying conflicts between the proposed Project and applicable land use plans. Consistency with land use policies and regulations is determined by reviewing the relevant planning documents applicable to the Project area, including the General Plan and Zoning Ordinance. Inconsistency between a project and a land use plan does not on its own represent a significant impact to the environment unless it would result in “a substantial, or potentially substantial, adverse change in any of the physical conditions within the area affected by the project.”5
As discussed above, California’s planning law does not require a project demonstrate strict conformity with a land use plan. A project would be considered consistent with a general plan if it demonstrates that it is “compatible with the General Plan's objectives, policies, general land uses and programs.”6“The question is not whether there is a direct conflict between some mandatory provision of a general plan and some aspect of a project, but whether the project is compatible with, and does not frustrate, the general plan’s goals and policies.”7 Accordingly, a project’s consistency with a land use plan’s goals or achievement of those goals is taken into account when determining potential impacts.
5 CEQA Guidelines section 15382.
6 Napa Citizens for Honest Government v. Napa County Bd. of Supervisors (2001) (91 Cal. App. 4th 342, 378)). 7 Ibid.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-9
Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance8to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Physically divide an established community.
• Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Project Impacts
Threshold LUP-1 Would the project physically divide an established community? Impact Analysis
Projects that typically divide established communities are projects like new highways, roadways, bridges, and utility lines, which can create new physical obstacles between different parts of a community. The Project would redevelop an undeveloped property into an approximately 405,531 square foot commercial retail center. The Project would also include off-site improvements consisting of existing signalized intersection of Coffee Road and Jet Way. Specifically, the improvements would include the installation of a new traffic light pole/structure at the southeast corner of the Coffee Road and Jet Way intersection and any necessary roadway improvements (i.e., modification to the existing raised median to provide a dedicated left-turn lane, roadway striping). Construction and operation of the proposed Project would be limited to the boundaries of the affected parcel and the identified off-site areas and would not encroach upon the surrounding area. The immediately surrounding area is developed with other commercial uses to the north, west, and east. The Project would not include the development of new obstacles that would divide the existing community. Additionally, the Project would connect to the existing roadway system and other infrastructure and would not involve the reconfiguration of streets that could have the potential to alter the surrounding pattern of future development. Because the Project would not physically divide an established community, no impact would occur.

The Project Site is designated as P and zoned as M-2. As part of the Project, the General Plan designation would be amended to change the designation from P to LI, which both allows for the Project’s use and aligns with its existing zoning designation. The specific businesses and/or tenants that would ultimately occupy each of the buildings included in the Project are not fully known at this time. However, it is assumed that larger interior anchor buildings within the Project Site would be occupied by markets, retail uses, storage uses, and a health club, and the outer building pads would be occupied by smaller retail tenants, a medical office, drive-thrus, fast casual and sit-down restaurants, a car wash, and a gas station with 20 dual-sided pumps. As such, these uses would be consistent with the Project Site’s amended General Plan land use designation, current zoning designation, and compatible with the established land use patterns in the immediately surrounding area. Therefore, the Project would not divide an established community, and there would be no impact, with no mitigation required. 8 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-10
Mitigation Measures
None required.

Level of Significance After Mitigation
No impact.

Threshold LUP-2: Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect? Impact Analysis
As described above, the Project Site is surrounded by Rosedale Highway and the Northwest Promenade to the north; a PG&E electric substation and vacant land to the south; El Toro Viejo Road, commercial retail, and a PG&E electric substation to the west; and Coffee Road, Friant-Kern Canal, and a commercial retail center to the east. The Project’s proposed commercial center would be consistent with the surrounding commercial uses, as well as the amended General Plan designation and current zoning designation, thus implementing the City’s vision for the area.

General Plan
The General Plan is discussed under Section 4.11.1, Regulatory Setting, and includes goals, policies, and implementing programs to achieve the City’s development vision. The applicable goals, policies, and implementing programs were adopted for purposes of avoiding or mitigating environmental effects contained in the various General Plan elements and those that are relevant to the Project are analyzed for consistency in Table 4.11-1, General Plan Consistency. A project’s inconsistency with a policy is only considered significant if such inconsistency would cause significant physical environmental impacts.

Table 4.11-1 General Plan Consistency
General Plan Goals and Policies Project Consistency
Land Use Element
General (Goals)
Goal 1: Accommodate new development which
captures the economic demands generated by the
marketplace and establishes Bakersfield’s role as capital of the southern San Joaquin Valley.

Consistent: The Project would develop an
approximately 405,531 square foot commercial retail
center. The Project would provide for economic growth
and revenue generation to the City through creation of a flexible, market-driven development that responds to the existing and future needs and demands of the City's
commercial markets.

Goal 2: Accommodate new development which
provides a full mix of uses to support its population.

Consistent: The specific businesses and/or tenants
that would ultimately occupy each of the buildings
included in the Project’s commercial development are
not fully known. However, the development is expected
to include single and multi-tenant retail; sit down, fast casual, and drive-thru restaurants; a car wash; a health club; a medical office; a bank; public storage; a gas
station; and associated electrical and fire riser rooms.

Therefore, the Project would provide a variety of
commercial uses that would serve various visitors and
customers that would be determined by the market.

Goal 3: Accommodate new development which is
compatible with and complements existing land uses.

Consistent: As discussed above, the Project Site is
surrounded by existing commercial uses to the north,
west, and east. The Project is consistent with the
Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-11
General Plan Goals and Policies Project Consistency
amended land use designation and zoning district.

Goal 4: Accommodate new development which
channels land uses in a phased, orderly manner and is
coordinated with the provision of infrastructure.

Consistent: Project development is anticipated to be
completed in two development phases. The first phase
would consist of development of approximately 37.8
acres located at the north end of the Project, as well as associated off-site improvements. The second phase
would result in development of the remaining 8.36 acres at the south-east end of the Project. Project buildout is anticipated to occur over an approximately 20-month
timeframe, commencing in early 2026 and ending in
late-2027. Phase 1 is anticipated to commence in early
2026 and completed by late 2027, with Phase 2
commencing in early 2027 and completed by late 2027.

Additionally, Project development would include
construction of all necessary on- and off-site
infrastructure improvements to adequately serve the
Project’s water, wastewater, and drainage needs. Solid
waste and recycling generated by the Project would be
collected and hauled away by and transported
to/disposed of at the appropriate facilities. Plans for utilities and service systems that would serve the Project include provision of electricity (PG&E), natural gas
(PG&E), and telecommunications (AT&T and
Spectrum). All new utility infrastructure would be
installed underground or placed in enclosed spaces
(e.g., utility closets).

Goal 6: Accommodate new development that is sensitive
to the natural environment, and accounts for
environmental hazards.

Consistent: As discussed in Section 4.9, Hazardous
and Hazardous Materials, of this Draft EIR, the Project would result in less than significant impacts. Geologic hazards are evaluated in Section 4.7, Geology and
Soils, of this Draft EIR. In Section 4.7, it is concluded that the Project would have less than significant impacts related to geologic hazards with incorporation of
mitigation measures. Impacts to Biological Resources in Section 4.4 of the Draft EIR were determined to be less than significant with incorporation of mitigation
measures.

Goal 7: Establish a built environment which achieves a
compatible functional and visual relationship among
individual buildings and sites.

Consistent: Section 4.1, Aesthetics, of this Draft EIR
evaluates the visual impacts of the Project Site. As
discussed in Section 4.1, the Project would have a
contemporary architectural design with articulated
facades. Buildings would have a maximum height of 90
feet (60 feet below the maximum building height for the M-2 zoning district). Building materials would include
but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display
windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and
cohesiveness to the Project Site. Along the Coffee Road Frontage and Rosedale Highway frontages would run a
“dry creek” feature composed of decorative cobbles and
decomposed granite and crushed rocks. As such, this
Draft EIR concluded that the Project would not have a
significant aesthetic impact and would be visual
compatible with the surrounding area.

Goal 8: Target growth companies that meet clean air
requirements and create sustainable employment in jobs
paying higher wages.

Consistent: As previously discussed, the Project’s
ultimate tenants would driven by the market; however,
the Project’s buildings would be constructed to promote the sustainable principles of smart growth. Compliance
with state laws regarding water and energy
Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-12
General Plan Goals and Policies Project Consistency
conservation, including Title 24, also would result in
increased efficiency and sustainability. Landscaping is anticipated to be native and drought tolerant and would comply with the Model Water Efficient Landscape
Ordinance, consistent with the City’s Municipal Code.

Commercial Development (Policies)
Policy 15: Allow for the development of a variety of
commercial centers/corridors which are differentiated by their function, intended users and level of intensity,
including convenience centers serving local residential neighborhoods, sub-regional centers which serve
groupings of neighborhoods, and major regional centers
which serve the planning area and surrounding areas.

Consistent: See the Project Consistency response to
Goal 2, above.

Policy 16: Allow for the development of a variety of
commercial uses, including those which serve residents
(groceries, clothing, etc.), highway users, and tourists-visitors.

Consistent: See the Project Consistency response to
Goal 2, above.

Policy 18: Require all new commercial designations be
assigned to sites where the aggregate of all contiguous parcels designated for commercial use is no less than five (5) acres, except for approved specific plans, parcels to be developed for highway-oriented service uses at
freeway on- and off-ramps, or where physical conditions are such that commercial is the only logical use of the property.

Consistent: The proposed Project Site is approximately

46.16 acres, which exceeds the five acre minimum.

Policy 19: Allow for the intensification and development of existing commercial areas in an infill fashion.

Consistent: The Project proposes to transform an
underutilized site into an active infill commercial center that would create economic, retail and service
opportunities in an area served with existing
infrastructure and public services.

Policy 20: The depth of new commercial developments
shall be at least half the length of the street frontage.

Exceptions may be made where existing development or
physical constraints provide a more logical shape.

Consistent: The Project would have frontages along
Coffee Road and Rosedale Highway (see Figure 7,
Street Frontage Enlargements, included in the Project
Description of this Draft EIR). The Project’s siting and setbacks are consistent Chapter 17.30, M-2 General
Manufacturing Zone, of City’s Municipal Code. The
Project Site is an L-shape parcel, which would be fully developed with the commercial development. The
Project is therefore designed to conform to the shape of the Project Site. Additionally, the Project would be
required to undergo design review by the City prior to
receiving approval.

Policy 24: Encourage the clustering of commercial
development in compact areas, rather than extended
along streets and highways.

Consistent: As discussed above, the Project consists
of an active infill commercial center on a site that is surrounded by existing commercial development to the
north, west, and east.

Policy 25: Provide for infill of commercial land uses to be compatible with the scale and character of existing
commercial districts and corridors.

Consistent: See the Project Consistency responses to
Policies 19, 20, and 24, above. The Project would have
a contemporary architectural design with articulated
facades. Buildings would have a maximum height of 90
feet (60 feet below the maximum building height for the M-2 zoning district). Building materials would include
but not be limited to cement plaster with stone veneer, aluminum wood siding metal canopies, and large display
windows. Careful and judicial use of landmark buildings, as well as signage, distinctive landscape palettes, and other such elements would provide an identity and
cohesiveness to the Project Site.

Policy 26: Encourage adjacent commercial uses to be of Consistent: See the Policy Consistency response to Policy 25. As previously discussed, the Project’s siting Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-13
General Plan Goals and Policies Project Consistency
compatible height, setback, color and materials. and setbacks are consistent Chapter 17.30, M-2 General Manufacturing Zone, of City’s Municipal Code.

Policy 28: Require that commercial development provide
design features such as screen walls, landscaping and
height, setback and lighting restrictions between the
boundaries of adjacent residential land use designations so as to reduce impacts on residences due to noise,
traffic, parking, and differences in scale.

Consistent: As previously discussed, the Project’s
siting and setbacks are consistent Chapter 17.30, M-2
General Manufacturing Zone, of City’s Municipal Code.

The Project would feature 325,120 square feet of new
landscaping along the entire site perimeter and internal to the Project Site. Landscaping would include a variety of ornamental trees, shrubs, and groundcover that
would help soften the massing of the buildings, provide for a pedestrian oriented experience and provide shade.

The Project would also include enhanced paving areas
within small plaza areas, in front of storefronts and
enhanced vehicle paving at entry points. Along the
Coffee Road Frontage and Rosedale Highway frontages
would run a “dry creek” feature composed of decorative
cobbles and decomposed granite and crushed rocks.

Lighting for the Project is intended to minimize light
trespass and glare from the Project Site onto adjacent
properties and to provide safety and nighttime visibility through shielded, focused, and directed illumination.

Lighting would consist of exterior building-mounted light fixtures; interior lighting for the new building; lighting for pedestrian walkways and common gathering areas;
lighting for the green spaces; ground-mounted
decorative lighting for landscape and architectural
features; signage lighting; lighting for the new parking areas, drive aisles, and loading dock areas; and security lighting.

The Project is anticipated to require a number of sign
types that would help identify and promote the Project
and its businesses and tenants. Sign types would
include multi-tenant pylon and monument signs, project
identification monument signs, tenant wall signs, and
onsite directional and legal signs.

Policy 30: Street frontages along all new commercial
development shall be landscaped.

A. Require new large retail commercial development
projects to evaluate decay impacts on existing
commercial uses as set forth in the implementation
measures.

B. Require perimeter street(s) around new commercial
office, retail, mixed-use, and industrial business park land uses where they will enhance pedestrian and
vehicular access from adjacent residential
neighborhoods or promote convenient access to
public transit services, and where anticipated traffic
will not detrimentally impact local streets. Exceptions may be allowed if natural or artificial barriers such as, but not limited to, railroads, utility corridors, canals or other watercourses, or topographic features exist
that create a logical separation between the uses, or
to encourage infill development.

Consistent: See the Project Consistency responses to
Policy 28, above, and Implementing Programs 18
through 21, below.

The Golden Empire Transit (GET) District is the main
transit agency servicing the City. Currently, GET
operates three bus routes: Route 61, Route 82 and
Route 84. Nearby pedestrian facilities include sidewalks along both sides of Rosedale Highway, both sides of
Coffee Road north of Jet Way and the westside of
Coffee Road south of Jet Way. Pedestrian crosswalks
are provided at signalized intersections along Rosedale Highway and Coffee Road. Existing Class II Bike Lanes
are provided in both directions along Rosedale Highway
and Coffee Road.

Pedestrian access to the Project Site would be provided via public sidewalks (10-foot-wide meandering multi-use paths) along Rosedale Highway and along Coffee Road.

Internal walkways would connect to the public sidewalks at key locations along Rosedale Highway and Coffee
Road. The internal walkways would provide access to
the various uses and areas of the Project. The internal sidewalks would also provide connectivity to the
Project’s “play area” that would consist of landscaped
mounds, benches, picnic tables, bike racks and a lawn
area. Also, striped crosswalks would be provided at key locations to allow for safe pedestrian crossing.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-14
General Plan Goals and Policies Project Consistency
General (Policies)
Policy 76: Provide for a mix of land uses which meets
the diverse needs of residents; offers a variety of
employment opportunities; capitalizes, enhances, and
expands upon existing physical and economic assets;
and allows for the capture of regional growth.

Consistent: The Project would develop an
approximately 405,531 square foot commercial retail
center. The Project would provide for economic growth
and revenue generation to the City through creation of a flexible, market-driven development that responds to the existing and future needs and demands of the City's
commercial markets.

The specific businesses and/or tenants that would
ultimately occupy each of the buildings included in the Project’s commercial development are not fully known.

However, the development is expected to include single
and multi-tenant retail; sit down, fast casual, and drive-thru restaurants; a car wash; a health club; a medical office; a bank; public storage; a gas station; and
associated electrical and fire riser rooms. Therefore, the Project would provide a variety of commercial uses that would serve various visitors and customers that would
be determined by the market.

Policy 78: Accommodate new projects which are infill or expansion of existing urban development.

Consistent: As previously discussed, The Project
proposes to transform an underutilized site into an active infill commercial center that would create economic,
retail and service opportunities in an area served with existing infrastructure and public services.

Policy 79: Provide for an orderly outward expansion of
new "urban" development (any commercial, industrial,
and residential development having a density greater
than one unit per acre) so that it maintains continuity of existing development, allows for the incremental
expansion of infrastructure and public services,
minimizes impacts on natural environmental resources,
and provides a high quality environment for living and
business.

Consistent: See the Project Consistency response to
Policy 78. The Project is consistent with surrounding,
existing commercial development to the north, west, and east. The Project would be served by existing public
services at the Project Site (see Project Consistency
Response to Goal 4). As demonstrated in this Draft EIR, impacts the environment have been mitigated with
mitigation measures (MM AQ-1, MM AQ-2, MM BIO-1
through MM BIO-3, MM CUL-1, MM CUL-2, MM GHG-1 through MM GHG-7, MM GEO-1). The Project includes contemporary architectural
Policy 81: Allow for flexibility in the specific siting of multi-family residential and commercial uses from the locations generally depicted on the Land Use Map in areas which
are undeveloped, used for resource production, or are
developed at very low densities through Planned Unit
Development, Planned Commercial Developments and
Specific Plans, provided that:

A. The overall density and distribution of land uses is maintained;
B. Multi-family and commercial uses are located in
proximity to principal roadways, public transit,
employment nodes, commercial services, and
recreational uses and within 330 feet of the location
depicted on the Land Use Policy Map;
C. Uses are sited to take advantage of pedestrian
greenbelts, recreational amenities, and natural
environmental resources;
D. The availability of infrastructure to the site or
adjacent service areas is not adversely impacted.

Consistent: As previously discussed, the Project would
be consistent with siting requirements and setbacks
required for the M-2 zoning district.

Policy 85: Encourage the revitalization of deteriorated land uses and buildings.

Consistent: See the Project Consistency response to
Policy 78.

Policy 86: Encourage infill of vacant parcels. Consistent: See the Project Consistency response to Policy 78.

Implementing Programs
Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakersfield – SCH No. 2025101507 4.11-15
General Plan Goals and Policies Project Consistency
Program 18: Require an Urban Decay Study for a retail
commercial shopping center proposed or estimated to be
over 250,000 square feet Gross Leasable Area "(GLA) in
size.

Consistent: An Urban Decay Analysis Technical
Memorandum was prepared for the Project by
PlaceWorks and dated September 19, 2025 (see
Appendix J). The Urban Decay Analysis analyzes the
retail market demand in the metropolitan Bakersfield
area to determine the potential of the Project to cause urban decay. The analysis found that the Project should not cause urban decay because there would be unmet
market demand after developing the Project, currently
and in five years. As such, the Project would not exceed expected market demand, and thus, will not directly
cause long-term vacancies in other competitive
retailers, leading to urban decay.

Program 19: Require an Urban Decay Study for a retail
store that will occupy more than 90,000 square feet Gross Leasable Area (GLA) and twenty percent (20%) or more
of the GLA is devoted to the sale of non-taxable
merchandise
Consistent: See the Project Consistency response to
Program 18.

Program 20: At time of site plan review, if an Urban
Decay Study has not yet been prepared and a project
meets or exceeds one of the thresholds listed above or
additional or new information would make preparation of a new or revised Urban Decay Study prudent, an Urban
Decay Study shalt be prepared. Phased submittal of a
PCD plan will require that assumptions regarding the total size, Gross Leasable Area, of the project at complete
build out be made to enable the City to determine the
need for an Urban Decay Study.

Consistent: See the Project Consistency response to
Program 18.

Program 21: If an Urban Decay Study has not been
submitted, the City shall require a PCD or PCD
Combining zone on all commercial projects over 20 acres in size. Retail Commercial designations within specific plan areas are exempt from the PCO requirement.

Consistent: See the Project Consistency response to
Program 18.

Source: Metropolitan Bakersfield General Plan, 2002.

In consideration of the above, the Project would be consistent with the applicable land use planning goals and policies. Therefore, any impact would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Cumulative Impacts
Impact Analysis
Section 3.3, Cumulative Development, identifies projects that are planned, are under construction, or are recently completed. A summary of these projects is provided in Table 3-1, Cumulative Projects List. Potential cumulative impacts would occur if the proposed Project in combination with the identified cumulative projects would result in significant effects to land use and planning.

For purposes of this analysis, the geographic scope for purposes of identifying cumulative impacts to land use and planning would be the City.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.11 Land Use and Planning
City of Bakerfield – SCH No. 2025101507 4.11-16
The Project would redevelop the Project Site with a commercial marketplace development and seek a land use designation change to LI. This land use designation change would be consistent with the Project Site’s existing zoning designation and the City’s vision for the area.

The Urban Decay Analysis Technical Memorandum, prepared by PlaceWorks and dated September 19, 2025, evaluated whether the Project, together with reasonably foreseeable pipeline retail development, could exceed market demand and cause long-term vacancies in competitive retail centers leading to urban decay. The analysis found that the Project would not not cause urban decay impacts because there would be unmet market demand after developing the Project, currently and after five years. Thus, the Project would not directly cause long-term vacancies in other competitive retail centers, leading to urban decay.

Each of the cumulative projects would be subject to CEQA and review by City regulatory agencies.

This would include a review of each project’s consistency with the General Plan, Zoning Ordinance, and other applicable requirements. Any conflicts would be mitigated or resolved through the City’s discretionary review and approval process. Impacts to land use would be less than significant. Accordingly, the proposed Project when combined with the cumulative projects, would not have any cumulatively considerable impacts on land use and planning.

Mitigation Measures
None required.

Level of Significance After Mitigation
The Project would result in less than significant cumulative impacts to land use and planning. No mitigation is required.

City of Bakersfield – SCH No. 2025101507 4.12-1

4.12 Mineral Resources
This section discusses potential impacts to mineral resources that may result from the proposed Riverview Marketplace Commercial Project (Project). Potential effects are evaluated based on the Project’s potential to result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the State; and the potential to result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan. Information in this section is based, in part, on the Metropolitan Bakersfield General Plan Update (General Plan) and its Environmental Impact Report (General Plan EIR), a Phase I Environmental Site Assessment (Phase I ESA) prepared for the Project by Rincon Consultants (Rincon) and dated August 21, 2025, and an Engineering Review of Plugged & Abandoned Oil & Gas Wellbores “REID-KCL” #1 and #3 (Well Engineering Report), prepared by Petrotech Resources Company, Inc. (Petrotech) and dated March 1, 2026 both reports are included in Appendix F, Hazards and Hazardous Materials Supporting Information, of this Draft Environmental Impact Report (EIR).

During the scoping period for the Project’s EIR, no comments were received in response to the Notice of Preparation (NOP).

4.12.1 Regulatory Setting
State
Surface Mining and Reclamation Act
The Surface Mining and Reclamation Act (SMARA) of 1975 (California Public Resources Code [PRC] §§ 2710-2796) required the California State Mining and Geology Board to classify California mineral resources with the Mineral Resource Zones (MRZs) system. These zones have been established based on the presence or absence of significant sand and gravel deposits and crushed rock and stone sources (e.g., products used in the production of cement). The MRZ categories are defined as follows:
• MRZ-1: Areas where available geologic information indicates there is little likelihood for the presence of significant mineral resources.
• MRZ-2a: Areas underlain by mineral deposits where geologic data indicate that significant measured or indicated resources are present. As shown on the California Mineral Land Classification Diagram, MRZ-2 is divided on the basis of both degree of knowledge and economic factors. Areas classified MRZ-2a contain discovered mineral deposits that are either measured or indicated reserves as determined by such evidence as drilling records, sample analysis, surface exposure, and mine information.

Land included in the MRZ-2a category is of prime importance because it contains known economic mineral deposits.
• MRZ-2b: Areas underlain by mineral deposits where geologic information indicates that significant inferred resources are present. Areas classified MRZ-2b contain discovered mineral deposits that are either inferred reserves as determined by limited sample analysis, exposure, and past mining history or are deposits that presently are sub-economic. Further exploration work and/or changes in technology or economics could result in upgrading areas classified MRZ-2b to MRZ-2a.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-2
• MRZ-3a: Areas containing known mineral occurrences of undetermined mineral resource significance. Further exploration work within these areas could result in the reclassification of specific localities into MRZ-2a or MRZ-2b categories. As shown on the California Mineral Land Classification Diagram, MRZ-3 is divided on the basis of knowledge of economic characteristics of the resources. • MRZ-3b: Areas containing inferred mineral occurrences of undetermined mineral resource significance. Land classified MRZ-3b represents areas in geologic settings that appear to be favorable environments for the occurrence of specific mineral deposits. Further exploration work could result in the reclassification of all or part of these areas into the MRZ-3a category or specific localities into MRZ-2a or MRZ-2b categories.
• MRZ-4: Areas of no known mineral occurrences where geologic information does not rule out either the presence or absence of significant mineral resources.

Department of Conservation, California Geologic Energy Management Division The California Geologic Energy Management Division (CalGEM) is a subdivision of the California Department of Conservation (DOC). CalGEM, formerly the Division of Oil, Gas, and Geothermal Resources, oversees the drilling, operation, maintenance, and plugging and abandonment of oil, natural gas, and geothermal energy wells. CalGEM functions as an information repository but also regulates oil and gas extraction activities consistent with state regulations, which include Section 3000 et seq. of the State Public Resources Code and Title 14, Division 2, Chapter 4 of the California Code of Regulations. CalGEM maintains Well Finder, an online mapping application that depicts California’s oil and gas industry information. CalGEM regularly updates oil well locations and status, oil field boundaries, lease boundaries, and district boundaries.

Local
City of Bakersfield General Plan Update
The City of Bakersfield (City’s) General Plan, Metropolitan Bakersfield General Plan dated December 2002, was updated in January 2016 per Resolution No. 018-16 and 019-16. At the time this EIR was published for public review, the City was in the process of updating its Bakersfield 2045 General Plan, but it has not yet been adopted. The General Plan includes goals, policies, and directions to achieve the City’s vision of the community and future development. The General Plan includes 12 elements that focus on: Land Use; Circulation; Open Space; Housing; Conservation; Noise; Safety; Downtown Redevelopment; Public Services Facilities; Parks; Kern River Plan; and Historical Resources.

The General Plan established the following goals and policies in order to protect the City’s mineral resources:

Conservation Element
CON/MR-G-1 Protect areas of significant resource potential for future use.

CON/MR-G-2 Document areas of current mineral and energy resource extraction, as a basis for land use and conservation policies and programs.

CON/MR-G-3 Avoid conflicts between the productive use of mineral and energy resource lands and urban growth.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-3
CON/MR-G-4 Protect land, water, air quality and visual resources from environmental damage resulting from mineral and energy resource development.

CON/MR-P-1 Maintain maps and descriptions of potential mineral and energy resources as a basis for policy and program implementation.

CON/MR-P-2 Document the location, status, and long-term viability of sand and gravel quarries and petroleum drilling sites for purposes of avoiding near and long-term land use conflicts and provide a basis for compliance monitoring.

CON/MR-P-4 Land use decisions shall recognize the importance of identified mineral resources and need for conservation of resources identified by the State Mining and Geology Board.

CON/MR-P-5 Protect significant mineral and petroleum resource areas, including potential sand and gravel extraction areas.

CON/MR-P-7 Promote development of compatible uses adjacent to mineral extraction areas.

CON/MR-P-8 Allow development of resource extraction sites subject to the conditional use permit procedure in zones where such uses are not permitted by right and where it can be shown that proposed extraction uses are compatible with surrounding uses.

CON/MR-P-9 Encourage preservation of any known deposits of gemstones and fossils.

CON/MR-P-10 Implement, as appropriate, the California Environmental Quality Act to minimize land use conflicts and reduce environmental impacts of all proposed resource extraction operations.

CON/MR-P-11 Prohibit incompatible development in areas which have a significant potential for harm to public health, safety and welfare due to mineral and petroleum extraction and processing.

CON/MR-P-13 Require surface mineral resource extraction sites to have plans and procedures for land reclamation; pursuant to the Surface Mining and Reclamation Act of 1975 (Public Resource Code Section 2710 et seq.) and conforming with the requirements of the State Mining and Geology Board Reclamation Regulations, to be implemented upon completion of extraction operations at each site or portion thereof.

CON/MR-P-14 Review all discretionary mineral or petroleum development including renewal of existing authorizations, under the policies and procedures of the California Environmental Quality Act.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-4
CON/MR-P-16 Require all mineral development to be predicated on appropriate reclamation plans that meet the standards of the State Surface Mining and Reclamation Act and the implementing guidelines of the State Mines and Geology Board, and (or) the standards of the State Division of Oil and Gas. Reclamation/restoration of the sites shall be done as each phase of development or extraction is completed.

4.12.2 Environmental Setting
As described in Chapter 2, Project Description, the Project Site is located in the northwestern portion of the City on an approximately 46.16-acre, undeveloped site, situated along the south side of Rosedale Highway, north of railroad tracks, west of Coffee Road, and east of El Toro Viejo Road. The Project Site is located on a portion of a larger property formerly occupied by the PG&E Kern Power Plant. Existing on-site features include abandoned oil wells; electrical transmission lines on metal poles, towers, and wooden poles; and several dirt roads and mounds.

Development of the Project Site would include construction and operation of a commercial retail center that would encompass approximately 405,531 square feet of total building space. The General Plan designates the Project Site as P (Public Facilities), and the Zoning Ordinance zones the Project Site as M-2 (General Manufacturing). The Project would include a General Plan Amendment (GPA) to the City’s General Plan, changing the Project Site’s designation from P (Public Facilities) to LI (Light Industrial), to facilitate the Project Site’s proposed use and create alignment with the Project Site’s M-2 zoning designation, which under the City’s stacked zoning code allows, by right, all uses permitted in M-1 (Light Manufacturing), C-O (Professional and Administrative Offices), C-1 (Neighborhood Commercial) and C-2 (Regional Commercial) zone.

Therefore, the LI designation has been determined to be the appropriate land use designation.

The principal mineral resources under development in the City are oil, natural gas, sand and gravel. The region is a major oil-producing area, with substantial oil and gas fields existing within the City boundaries. According to the General Plan, sand and gravel areas within the City are concentrated primarily along the floodplain and alluvial fan of the Kern River, where clean, coarse deposits have been left by major floods over the past several thousand years. Sand and gravel are an important resource for construction, development, and physical maintenance in the City.

The California Department of Conservation Division of Mine Reclamation does not indicate that any active mining operations are located on or near the Project Site.1 Additionally, the Mineral Resource Zone (MRZ) classification areas in the City are shown in the California Geological Survey’s mineral resources map, “Updated Mineral Land Classification Map for Portland Cement Concrete-Grade Aggregate in the Bakersfield Production-Consumption Region, Kern County, California.”2 The Project Site falls within the MRZ-3 zone, which indicates areas containing mineral deposits the significance of which cannot be evaluated from available data.

Oil production activities within the City have been historically concentrated in the outskirts of the City’s developed area. As noted above, the Project Site is within the Fruitvale Oil Field, however, the Fruitvale Oil Field has been depleted to a state of being under-pressured and is incapable of flowing liquid to the surface and is no longer active.
1 California Department of Conservation (DOC). 2016. Division of Mine Reclamation, Mines Online. Available at:
https://maps.conservation.ca.gov/mol/index.html. Accessed January 2026. 2 California DOC. 2009. California Geological Survey. Updated Mineral Land Classification Map for Portland Cement Concrete-Grade Aggregate in the Bakersfield Production-Consumption Region, Kern County, California. Available at:
https://filerequest.conservation.ca.gov/?q=SR_210. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-5
Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA prepared for the Project (Appendix F), the oil wells were plugged and abandoned to current CalGEM standards. As noted in the Well Engineering Report, the original existing plugging and abandonment of both wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface.

4.12.3 Impact Analysis
Methodology
The effects of the proposed project on mineral resources were assessed qualitatively. The analysis included identifying mineral resources employing maps and databases made available to the public by the State and assessing the potential effects of the proposed Project on these resources. Sources employed include the California Geologic Energy Management Division (CalGEM) Well Finder and the California Geological Survey’s mineral resources map, “Updated Mineral Land Classification Map for Portland Cement Concrete-Grade Aggregate in the Bakersfield Production-Consumption Region, Kern County, California.” Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance3to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would:
• Result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state.
• Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? Project Impacts
Threshold MIN-1: Would the project result in the loss of availability of a known mineral resource that would be a value to the region and the residents of the state?
Impact Analysis
As discussed in Section 3.12.2, Environmental Setting, the DOC’s Mines Online mapping application indicates that there are no mineral mines located on or near the Project Site. The California Geological Survey’s mineral map indicates that the Project Site falls within the MRZ-3 zone, which indicates areas containing mineral deposits the significance of which are unknown.

The most recent mineral resources map for the Project Site was published in 2009 and did not further delineate this zone into (a) or (b). However, there are no established current economic operations for concrete aggregate extraction within or near the Project Site.

As noted in the Engineering Review of Plugged & Abandoned Oil & Gas Wellbores RED KCL #1 and #3, (Appendix F-2), like most fields located in this area of Kern County, the Fruitvale Oil Field 3 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-6
has been depleted to a state of being under-pressured and is incapable of flowing liquid to the surface
Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA (Appendix F-1), the oil wells were plugged and abandoned to current CalGEM standards. Based on the California DOC’s Well Finder map, the Project site is within the Fruitvale oil/gas field. Five “plugged” oil and gas production wells, two “plugged” oil and gas production wells, one “plugged” waterflood well, and three “abandoned/removed tanks” are mapped as located on the Project Site. According to the Phase I ESA, the oil wells were plugged and abandoned to current CalGEM standards. Additionally, as noted in the Well Engineering Report, the original existing plugging and abandonment of both wells was approved by CalGEM’s predecessor at the time as adequately meeting the requirement for protecting all subsurface strata, ground water, and the surface. The Phase I ESA concludes that there is no evidence of any petroleum products still existing within the Project site. Therefore, no known mineral resource is located on the Project Site. Moreover, the Project does not propose operations that would encroach upon existing oil operations. Accordingly, the Project would have less than significant impacts related to the loss of a known mineral resource, and no mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Threshold MIN-2: Would the project result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan?
Impact Analysis
As discussed above, the Project Site does not serve as an active mining site, nor is there any mining activity in the Project vicinity. Additionally, as discussed above, all wells located on site have been permanently plugged and abandoned. The Project Site is designated by the General Plan as P and would require a GPA to change the land use designation to LI, which has been determined to be consistent with the proposed uses included in the Project. As such, the Project Site is not designated as Mineral and Petroleum (R-MP), which is a land use designation utilized for areas which contain producing, or potentially productive, petroleum fields and mineral deposits. Therefore, the Project would not result in the loss of availability of a locally important mineral resource recovery site and there would be less than significant impacts. No mitigation is required.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-7
Cumulative Impacts
As previously discussed, the Project site does not contain any active mining or mineral extraction operations and all wells on site have been permanently sealed and abandoned. The Project Site and its surrounding vicinity falls within the MRZ-3 zone, where there is not enough available geologic information to determine the presence of significant mineral resources. While the Project Site is located within the Fruitvale oil/gas field and active oil and gas wells are located directly west and south of the Project, implementation of the Project would not impact the operation of these wells. All other cumulative projects proposed within the vicinity of the Project would be required to analyze the project-specific impacts to any mining, mineral extraction, and wells in the vicinity of the Project Site and mitigate any potential impacts accordingly. Therefore, the Project in combination with cumulative impacts would have a less than significant cumulative impact. As such, no mitigation is required. Accordingly, neither the proposed Project nor the cumulative projects would have impacts, including cumulative impacts, associated with mineral resources.

Mitigation Measures
No mitigation measures are required as the Project would have less than significant impacts to mineral resources.

Level of Significance After Mitigation
There would be no Project-specific or cumulative significant impacts related to mineral resources and no mitigation is required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.12 Mineral Resources
City of Bakersfield – SCH No. 2025101507 4.12-8
This page intentionally left blank.

City of Bakersfield – SCH No. 2025101507 4.13-1

4.13 Noise
This section of the Draft EIR addresses potential noise and vibration impacts associated with the Project. This discussion includes information regarding noise fundamentals, regulatory setting, the existing noise environment, the noise analysis methodology, and the potential Project-related noise and vibration impacts. A noise study, dated April 2026, was prepared by Placeworks for the Project and is included as Appendix G, Noise and Vibration Technical Study.

4.13.1 Noise Fundamentals
Noise is most often defined as unwanted sound. Although sound can be easily measured, the perception of noise and the physical response to sound complicate the analysis of its impact on people. People judge the relative magnitude of sound sensation in subjective terms such as “noisiness” or “loudness.”
The following are brief definitions of terminology:
• Sound. A disturbance created by a vibrating object, which, when transmitted by pressure waves through a medium such as air, is capable of being detected by a receiving mechanism, such as the human ear or a microphone.
• Noise. Sound that is loud, unpleasant, unexpected, or otherwise undesirable. • Decibel (dB). A unitless measure of sound, expressed on a logarithmic scale and with respect to a defined reference sound pressure. The standard reference pressure is 20 micropascals (20 µPa).
• Vibration Decibel (VdB). A unitless measure of vibration, expressed on a logarithmic scale and with respect to a defined reference vibration velocity. In the U.S., the standard reference velocity is 1 micro-inch per second (1x10-6 in/sec). • A-Weighted Decibel (dBA). An overall frequency-weighted sound level in decibels that approximates the frequency response of the human ear.
• Equivalent Continuous Noise Level (Leq); also called the Energy-Equivalent Noise Level.

The value of an equivalent, steady sound level which, in a stated time period (often over an hour) and at a stated location, has the same A-weighted sound energy as the time-varying sound. Thus, the Leq metric is a single numerical value that represents the equivalent amount of variable sound energy received by a receptor over the specified duration.
• Statistical Sound Level (Ln). The sound level that is exceeded “n” percent of the time during a given sample period. For example, the L50 level is the statistical indicator of the time-varying noise signal that is exceeded 50 percent of the time (during each sampling period); that is, half of the sampling time, the changing noise levels are above this value and half of the time they are below it. This is called the “median sound level.” The L10 level, likewise, is the value that is exceeded 10 percent of the time (i.e., near the maximum) and this is often known as the “intrusive sound level.” The L90 is the sound level exceeded 90 percent of the time and is often considered the “effective background level” or “residual noise level.”
• Maximum Sound Level (Lmax). The highest RMS sound level measured during the measurement period.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-2
• Root Mean Square Sound Level (RMS). The square root of the average of the square of the sound pressure over the measurement period.
• Day-Night Sound Level (Ldn or DNL). The energy-average of the A-weighted sound levels occurring during a 24-hour period, with 10 dB added to the sound levels occurring during the period from 10:00 PM to 7:00 AM.
• Community Noise Equivalent Level (CNEL). The energy average of the A-weighted sound levels occurring during a 24-hour period, with 5 dB added from 7:00 PM to 10:00 PM and 10 dB from 10:00 PM to 7:00 AM. NOTE: For general community/environmental noise, CNEL and Ldn values rarely differ by more than 1 dB (with the CNEL being only slightly more restrictive – that is, higher than the Ldn value). As a matter of practice, Ldn and CNEL values are interchangeable and are treated as equivalent in this assessment. • Peak Particle Velocity (PPV). The peak rate of speed at which soil particles move (e.g., inches per second) due to ground vibration.
• Sensitive Receptor. Noise- and vibration-sensitive receptors include land uses where quiet environments are necessary for enjoyment and public health and safety. Residences, schools, motels and hotels, libraries, religious institutions, hospitals, and nursing homes are examples.

Characteristics of Sound
When an object vibrates, it radiates part of its energy in the form of a pressure wave. Sound is that pressure wave transmitted through the air. Technically, airborne sound is a rapid fluctuation or oscillation of air pressure above and below atmospheric pressure that creates sound waves.

Sound can be described in terms of amplitude (loudness), frequency (pitch), or duration (time).

Loudness or amplitude is measured in dB, frequency or pitch is measured in Hertz [Hz] or cycles per second, and duration or time variations is measured in seconds or minutes.

Amplitude
Unlike linear units such as inches or pounds, decibels are measured on a logarithmic scale.

Because of the physical characteristics of noise transmission and perception, the relative loudness of sound does not closely match the actual amounts of sound energy. Table 2, Noise Perceptibility, presents the subjective effect of changes in sound pressure levels. Ambient sounds generally range from 30 dBA (very quiet) to 100 dBA (very loud). Changes of 1 to 3 dBA are detectable under quiet, controlled conditions, and changes of less than 1 dBA are usually not discernible (even under ideal conditions). A 3 dBA change in noise levels is considered the minimum change that is detectable with human hearing in outside environments. A change of 5 dBA is readily discernible to most people in an exterior environment, and a 10 dBA change is perceived as a doubling (or halving) of the sound.

Frequency
The human ear is not equally sensitive to all frequencies. Sound waves below 16 Hz are not heard at all but are “felt” more as a vibration (predominantly in a person’s chest cavity). Similarly, though people with extremely sensitive hearing can hear sounds as high as 20,000 Hz, most people cannot hear above 15,000 Hz. In all cases, hearing acuity falls off rapidly above about 10,000 Hz and below about 200 Hz.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-3
When describing sound and its effect on a human population, A-weighted (dBA) sound levels are typically used to approximate the response of the human ear. The A-weighted noise level has been found to correlate well with people’s judgments of the “noisiness” of different sounds and has been used for many years as a measure of community and industrial noise.

Duration
Time variation in noise exposure is typically expressed in terms of a steady-state energy level equal to the energy content of the time-varying period (called Leq), or alternately, as a statistical description of the sound level that is exceeded over some fraction of a given observation period.

For example, the L50 noise level represents the noise level that is exceeded 50 percent of the time—half the time the noise level is higher than this level and half the time the noise level is lower—or exceeded for 30 minutes in an hour. Similarly, the L2, L8 and L25 values represent the noise levels that are exceeded 2, 8, and 25 percent of the time or 1, 5, and 15 minutes per hour, respectively. These “n” values are typically used to demonstrate compliance with cities’ noise ordinances for stationary noise sources. Other values typically noted during a noise survey are the Lmin and Lmax. These values represent the minimum and maximum root-mean-square noise levels obtained over the measurement period, respectively.

Because community receptors are more sensitive to unwanted noise intrusion during the evening and at night, state law and many local jurisdictions use an adjusted 24-hour noise descriptor called the Community Noise Equivalent Level (CNEL) or Day-Night Noise Level (Ldn). The CNEL descriptor requires that an artificial increment (or “penalty”) of 5 dBA be added to the actual noise level for the hours from 7:00 pm to 10:00 pm and 10 dBA for the hours from 10:00 pm to 7:00 am.

The Ldn descriptor uses the same methodology except that there is no artificial increment added to the hours between 7:00 pm and 10:00 pm. Both descriptors give roughly the same 24-hour level, but the CNEL is slightly higher and therefore more restrictive. The CNEL or Ldn metrics are commonly applied to the assessment of roadway- and airport-related noise sources.

Sound Propagation
Sound dissipates exponentially with distance from the noise source. This phenomenon is known as “spreading loss.” For a single-point source, sound levels decrease by approximately 6 dBA for each doubling of distance from the source (conservatively neglecting ground attenuation effects, air absorption factors, and barrier shielding).

For example, if a backhoe at 50 feet generates 84 dBA, at 100 feet the noise level would be 78 dBA, and at 200 feet it would be 72 dBA. This drop-off rate is appropriate for noise generated by on-site operations from stationary equipment or activity at a project site. If noise is produced by a line source, such as highway traffic, the sound decreases by 3 dBA for each doubling of distance over a reflective (“hard site”) surface such as concrete or asphalt. Line source noise in a relatively flat environment with ground-level absorptive vegetation decreases by an additional

1.5 dBA for each doubling of distance.

Psychological and Physiological Effects of Noise
Physical damage to human hearing begins at prolonged exposure to noise levels higher than 85 dBA. Exposure to high noise levels affects the entire system, with prolonged noise exposure in excess of 75 dBA increasing body tensions, which affects blood pressure and functions of the heart and the nervous system. Extended periods of noise exposure above 90 dBA result in permanent cell damage, which is the main driver for employee hearing protection regulations in the workplace. For community environments, the ambient or background noise problem is Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-4
widespread, though generally worse in urban areas than in outlying, less-developed areas.

Elevated ambient noise levels can result in noise interference (e.g., speech interruption/masking, sleep disturbance, disturbance of concentration) and cause annoyance. Although the A-weighted scale and the energy-equivalent metric are commonly used to quantify the range of human response to individual events or general community sound levels, the degree of annoyance or other response also depends on several other perceptibility factors, including:
• Ambient (background) sound level
• General nature of the existing conditions (e.g., quiet rural or busy urban) • Difference between the magnitude of the sound event level and the ambient condition • Duration of the sound event
• Number of event occurrences and their repetitiveness
• Time of day that the event occurs
Since most people do not routinely work with decibels or A-weighted sound levels, it is often difficult to appreciate what a given sound pressure level number means. To help relate noise level values to common experience, Table 4.13-1, Typical Noise Levels, shows typical noise levels from familiar sources.

Table 4.13-1 Typical Noise Levels
Common Outdoor Activities
Noise Level
(dBA) Common Indoor Activities
110 Rock Band
Jet Flyover at 1,000 feet
100
Gas Lawn Mower at three feet
90 Diesel Truck at 50 feet, at 50 mph Food Blender at 3 feet 80 Garbage Disposal at 3 feet
Noisy Urban Area, Daytime
70 Vacuum Cleaner at 10 feet
Commercial Area Normal speech at 3 feet
Heavy Traffic at 300 feet 60
Large Business Office
Quiet Urban Daytime 50 Dishwasher Next Room
Quiet Urban Nighttime 40 Theater, Large Conference Room (background)
Quiet Suburban Nighttime
30 Library
Quiet Rural Nighttime Bedroom at Night, Concert Hall (background) 20 Very Remote & Unpopulated Area
Nighttime
Broadcast/Recording Studio
10 Lowest Threshold of Human Hearing 0 Lowest Threshold of Human Hearing Source: Caltrans 2013.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-5
Characteristics of Vibration
Vibration is an oscillatory motion through a solid medium in which the motion’s amplitude can be described in terms of displacement, velocity, or acceleration. Vibration is normally associated with activities stemming from operations of railroads or vibration-intensive stationary sources but can also be associated with construction equipment such as jackhammers, pile drivers, and hydraulic hammers. As with noise, vibration can be described by both its amplitude and frequency. Vibration displacement is the distance that a point on a surface moves away from its original static position; velocity is the instantaneous speed that a point on a surface moves; and acceleration is the rate of change of the speed. Each of these descriptors can be used to correlate vibration to human response, building damage, and acceptable equipment vibration levels. During construction, the operation of construction equipment can cause groundborne vibration. During the operational phase of a project, receptors may be subject to levels of vibration that can cause annoyance due to noise generated from the vibration of a structure or items within a structure.

Vibration amplitudes are usually described in terms of either the peak particle velocity (PPV) or the root mean square (RMS) velocity. PPV is the maximum instantaneous peak of the vibration signal, and RMS is the square root of the average of the squared amplitude of the signal. PPV is more appropriate for evaluating potential building damage, and RMS is typically more suitable for evaluating human response.

As with airborne sound, annoyance with vibrational energy is a subjective measure that depends on the level of activity and the sensitivity of the individual. To sensitive individuals, vibrations approaching the threshold of perception can be annoying. People accustomed to elevated ambient vibration levels, such as in an urban environment, may tolerate higher vibration levels.

Table 4.13-2, Human Reaction to Typical Vibration Levels, displays the human response and the effects on buildings resulting from continuous vibration (in terms of PPV).

Table 4.13-2 Human Reaction to Typical Vibration Levels Vibration Level,
PPV (in/sec) Human Reaction Effect on Buildings

0.006–0.019 Threshold of perception, possibility of
intrusion
Vibrations unlikely to cause damage of any
type

0.08 Vibrations readily perceptible
Recommended upper level of vibration to
which ruins and ancient monuments should
be subjected

0.10 Level at which continuous vibration
begins to annoy people
Virtually no risk of “architectural” (i.e., not
structural) damage to normal buildings

0.20 Vibrations annoying to people in buildings
Threshold at which there is a risk to
“architectural” damage to normal dwelling –
houses with plastered walls and ceilings

0.4–0.6
Vibrations considered unpleasant by
people subjected to continuous vibrations
and unacceptable to some people walking
on bridges
Vibrations at a greater level than normally
expected from traffic, but would cause
“architectural” damage and possibly minor
structural damage
Source: Caltrans 2020.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-6

4.13.2 Regulatory Setting
State
California Building Code
The California Green Building Standards Code (CALGreen) has requirements for insulation that affect exterior-to-interior noise transmission for non-residential structures. Pursuant to CALGreen Section 5.507.4.1, Exterior Noise Transmission, an architectural acoustics study may be required when a project site is in a 65 dBA CNEL or Ldn noise contour of an airport, freeway or expressway, railroad, industrial source, or fixed-guideway source. Where noise contours are not readily available, if buildings are exposed to a noise level of 65 dBA Leq during any hour of operation, specific wall and ceiling assembly and sound-rated windows may be necessary to reduce interior noise to acceptable levels.

Local
City of Bakersfield General Plan
The City’s General Plan Noise Element includes an assessment of the existing community noise environment, including surveys of residents, and an action plan for achieving goals for the future noise environment in the City. The noise element aims to protect the health and well-being of the City’s residents by establishing and preserving quiet environments. Goals and policies from the noise element that are applicable to the Project are:
• Goal: Ensure that residents of the Bakersfield Metropolitan Area are protected from excessive noise and existing moderate levels of noise are maintained. • Goal: Protect the citizens of the planning area from the harmful effects of exposure to excessive noise and protect the economic base of the area by preventing the encroachment of incompatible land uses near known noise-producing roadways, industries, railroads, airports, and other sources.
• Policy. Review discretionary industrial, commercial, or other noise generating land use projects for compatibility with nearby noise-sensitive land uses. Additionally, the development of new noise generating land uses which are not preempted from local regulation will be reviewed if resulting noise levels will exceed the performance standards contained within Table VII-2 in areas containing residential or other noise-sensitive land uses.
• Policy. Require noise level criteria applied to land uses other than residential or other noise-sensitive uses to be consistent with the recommendations of the California Office of Noise Control.
• Policy. Establish threshold standards for the determination of the existence of cumulative noise impacts that are significant and will therefore require mitigation to achieve acceptable noise standards that do not exceed the standards contained in this element.

In addition to goals and policies, the noise element includes the following applicable implementations.
• Implementation 2. Review discretionary development plans, programs, and proposals, including those initiated by both the public and private sectors, to ascertain and ensure their conformance to the policy framework outlined in this element.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-7
• Implementation 4. Require proposed commercial and industrial uses or operations to be designed or arranged so that they will not subject residential or other noise sensitive land uses to exterior noise levels in excess of 65 dB(A) CNEL and interior noise levels in excess of 45 dB(A) CNEL and so that impacts on noise sensitive uses shall not exceed the performance in standards in Table VII-2 (Table 5 in this study). • Implementation 10. Standards for Project Noise Impacts for Mobile Sources. A significant increase of existing ambient noise levels affecting existing noise sensitive land uses, and requiring the adaptation of practical and feasible mitigation measures, is deemed to occur where a project will cause:
▪ An increase of the existing ambient noise levels by 5 dB(A) or more, where the existing ambient level is less than 60 dB(A) CNEL.
▪ An increase of the existing ambient noise level by 3 dB(A) or more, where the existing ambient level is 60 dB(A) to 65 dB(A) CNEL.
▪ An increase of the existing ambient noise level by 1.5 dB(A) or more, where the existing ambient level is greater than 65 dB(A) CNEL.

Standards for Cumulative Noise Impacts for Mobile Sources. A project’s contribution to noise increase would normally be considered cumulatively considerable and considered significant when ambient noise levels affect noise sensitive land uses (receptors) and when the following occurs.
• A project increases the ambient (cumulative without project) noise level by 1 dB(A) or more; and,
• The cumulative with project noise levels cause the following:
▪ An increase of the existing ambient noise level by 5 dB(A) or more, where the existing ambient level is less than 60 dB(A) CNEL.
▪ An increase of the existing ambient noise level by 3 dB(A) or more, where the existing ambient level is 60 to 65 dB(A) CNEL
▪ An increase on the existing ambient noise level by 1.5 dB or more, where the existing ambient level is greater than 65 dB(A) CNEL.

The Bakersfield General Plan provides regulations to control unnecessary, excessive, and annoying noise and vibration in the City. Exterior noise limits based on noise-sensitive land uses are shown in Table 4.13-3, Exterior Stationary Noise Standards.

Table 4.13-3 Exterior Stationary Noise Standards
Category
Cumulative number of
minutes in any one-hour
period
Daytime 7:00 am to 10:00 pm Nighttime 10:00 pm to 7:00
am
1 30 (L50) 55 50
2 15 (L25) 60 55
3 5 (L8.3) 65 60
4 1 (L1.7) 70 65
5 0 (Lmax) 75 70
Source: Bakersfield 2002, Table VII-2.

Note: Each of the noise level standards specified in this table shall be reduced by five (5) dB(A) for pure tone noises, noises consisting primarily of speech or music, or for recurring impulsive noises. These noise level standards should be applied at a residential or other noise-sensitive land use and not on the property of a noise-generating land use.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-8
City of Bakersfield Municipal Code
Construction Noise
Under Section 9.22.050, Noise during construction, of the Bakersfield Municipal Code, the City prohibits construction activities from 9:00 p.m. to 6:00 a.m. Monday through Friday (including federal holidays), and before 8:00 a.m. or after 9:00 p.m. on weekends that produce loud or unusual noise which annoys or disturbs a reasonable person of normal sensitivity.

Design Standards for Retail Developments
Noise standards for retail developments is under Section 17.08.140(I), Delivery/Loading and Solid Waste Operations for Projects Exceeding Fifty Thousand Square Feet of Gross Floor Area and/or Five Acres of Buildable Area. Under Section 17.08.140(I)(2), in addition to compliance with the noise level performance standards table in the noise element of the Metropolitan General Plan for daytime/nighttime exterior noise levels, other than trash removal by the City or its contractors, all loading, unloading, delivery, private refuse collection and related operations shall not be permitted between the hours of 10:00 p.m. and 7:00 a.m. adjacent to any land zoned or developed with residential uses. These activities may occur if the developer submits evidence to the City that sound mitigation will reduce the noise generated by such operations to less than 3 dBA above the measured background noise level at the same period for any three continuous minutes in any hour during the operation as measured at the property line adjacent to said residential lands.

Under Section 17.08.140(I)(3), loading docks shall include separate walls for noise attenuation adjacent to residential areas and be screened with landscaping (evergreen trees twenty feet on center) so the loading docks are not visible from residential areas or public streets.

4.13.3 Environmental Setting
Ambient Noise Measurements
To determine a baseline noise level in the vicinity of the Project, ambient noise monitoring was conducted in the vicinity of the Project Site. Noise monitoring was conducted on November 17, 2022, and November 18, 2022. Noise measurements consisted of three short-term (15-minute) measurements during the afternoon peak traffic hours of 3:00 pm to 6:00 pm; and one long-term (24-hour) measurement. Although the noise monitoring was conducted in late 2022, it is applicable for establishing baseline conditions as the Project area is dominated by traffic noise and there have been no significant changes in the Project area since the monitoring was conducted. Additionally, the noise modeling included in the technical appendices to the Noise and Vibration Technical Study, Appendix G, is based on the Project as proposed.

The primary noise source at all measurement locations is roadway traffic. Activities from surrounding commercial and retail uses (such as car doors shutting, faint music, conversations, and truck delivery/loading) also contributed to the overall noise environment. Meteorological conditions during the measurement period were favorable for outdoor sound measurements and were noted to be representative of the typical conditions for the season. Generally, conditions included cloudy skies with temperatures varying between 65 to 73 degrees Fahrenheit (°F) and winds averaging 1 mile per hour (mph) or less. All sound level meters were equipped with a windscreen during measurements.

Results are summarized in Table 4.13-4, Long-Term Noise Measurement Summary and Table 4.13-4, Short Term Noise Measurement Summary below and shown on Figure 3, Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-9
Approximate Noise Monitoring Locations within Appendix G, Noise and Vibration Technical Study.

Table 4.13-4 Long-Term Noise Measurement Summary
Monitoring
Location Description
24-hour Noise Level, dBA
CNEL Lowest Leq(1hr) Highest Leq(1hr)
LT-1
8290 Rosedale Highway
(between Arby’s and Del
Taco restaurants).
11/17/2022, 2:00 pm
79 65.5 76.0
Table 4.13-5 Short-Term Noise Measurements Summary in A-Weighted Sound Levels Monitoring
Location Description
15-Minute Noise Level, dBA
Leq Lmax Lmin L50 L25 L8 L2
ST-1 Alongside Rosedale Highway
(SR-58) 11/17/2022, 4:57 pm 80.2 101.8 58.0 73.9 78.7 81.2 86.8 ST-2 Across 2301 El Toro Viejo Road
(residence) 11/17/2022, 4:32 pm 67.3 83.5 50.1 57.6 64.1 72.7 77.4 ST-3 Coffee Road north of Jet Way
11/17/2022, 3:11 pm 75.7 90.6 56.4 73.4 76.5 79.7 82.3
• Long-Term Location 1 (LT-1) was mounted along Rosedale Highway (State Route 58) at 8290 Rosedale Highway (between Arby’s and Del Taco restaurants) and approximately 60 feet north of the nearest westbound travel lane centerline. A 24-hour noise measurement was conducted, beginning at 2:00 pm on Thursday, November 17, 2022.

The noise environment is characterized primarily by Rosedale Highway vehicular traffic. • Short-Term Location 1 (ST-1) was at the northern project site boundary next to 8875 Rosedale Highway (a Sonic restaurant). The measurement location was approximately 15 feet south of the nearest eastbound travel lane centerline. A 15-minute noise measurement began at 4:57 pm on Thursday, November 17, 2022. The noise environment is characterized primarily by traffic noise from Rosedale Highway. Traffic noise generally ranged from 70 dBA to 83 dBA.
• Short-Term Location 2 (ST-2) was along the western project site boundary across from 2301 El Toro Viejo Road (residence). The measurement location was approximately 5 feet east of the nearest northbound travel lane centerline. A 15-minute noise measurement began at 4:32 pm on Thursday, November 17, 2022. The noise environment is characterized primarily by traffic noise from Rosedale Highway and El Toro Viejo Road.

Secondary noise sources included truck-stop operations of power washers, cargo doors opening and closing, and heavy-duty trucks moving and loading and unloading cargo.

Traffic noise levels generally ranged from 60 dBA to 75 dBA from local traffic. Traffic from Rosedale Highway was up to 60 dBA. Other noise levels from secondary noise sources ranged between 50 dBA to 55 dBA.
• Short-Term Location 3 (ST-3) was across the project site boundary along Coffee Road just north of Jet Way. A 15-minute noise measurement began at 3:11 pm on Thursday, November 17, 2022. This is a high-traffic-volume area, and the noise environment is characterized by roadway noise from Coffee Road and Rosedale Highway. Noise levels generally ranged between 70 dBA to 83 dBA.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-10
Sensitive Receptors
Certain land uses are particularly sensitive to noise and vibration, including residential, schools, hospitals, and open space/recreation areas where quiet environments are necessary for enjoyment, public health, and safety. These uses are regarded as sensitive to noise because they are where citizens most frequently engage in activities which are likely to be disturbed by noise, such as reading, studying, sleeping, resting, or otherwise engaging in quiet or passive recreation.

Commercial and industrial uses are not particularly sensitive to noise or vibration. The nearest existing sensitive receptors to the Project Site include the Green Acres Estates Senior Mobile Home Park to the west along Rosedale Highway and single-family residential uses to the southwest along El Toro Viejo Road. Additional residential receptors are more than 750 feet from the Project Site to the north.

4.13.4 Impact Analysis
Methodology
The analysis of construction noise from future development projects anticipated under the City’s General Plan utilizes the Federal Highway Administration (FHWA) Roadway Construction Noise Model (RCNM). The model is based on a representative equipment mix for standard construction activities. Given the variable nature of construction, the worst-case scenario is modeled by combining the Leq contributions from the simultaneous operation of the three loudest pieces of equipment for a given activity. Construction noise levels are modeled from the acoustical center of a hypothetical construction area of each phase to the property line of the nearest noise-sensitive receptor.

Future traffic noise levels were calculated for roadway segments forecasted to experience the most substantial increases in traffic volume. Transportation noise levels were modeled using the FHWA Traffic Noise Prediction Model, incorporating the provided traffic volumes, posted speeds, vehicle type percentages, number of lanes, and intervening site conditions. Average daily traffic (ADT) segment volumes provided by Integrated Engineering Group (IEG) for existing and project buildout are used to estimate traffic noise increases.

Groundborne vibration and noise from construction is determined using Federal Transit Administration (FTA) methodology and reference vibration levels for typical equipment. Vibration levels are modeled from the nearest disturbance area of the construction site to the foundation or building façade of the nearest sensitive receptor.

Thresholds of Significance
The City utilizes the California Environmental Quality Act (CEQA) Guidelines, Appendix G, and thresholds of significance1to analyze the environmental impacts of the Project. Per CEQA Guidelines, an impact is considered significant if the Project would result in:
• Generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies. (Threshold N-1) 1 Association of Environmental Professionals (AEP). 2025. CEQA Guidelines Appendices, Appendix G: Environmental Checklist Form. Available at: https://www.califaep.org/docs/CEQA_Handbook_2025combined.pdf. Accessed January 2026.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-11
• Generation of excessive ground-borne vibration or ground-borne noise levels. (Threshold N-2)
• For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels. (Threshold N-3)
As mentioned above, under the General Plan Noise Element, Implementation 10, a significant traffic noise impact would occur if the Project would result in a noise increase at noise sensitive land uses of:
• 1.5 dBA or more where the existing noise level is above 65 dBA CNEL. • 3 dBA or more where the existing noise level is between 60 to 65 dBA CNEL. • 5 dBA or more where the existing noise level is less than 60 dBA CNEL.

Construction Noise
Section 9.22.050 of the Bakersfield Municipal Code prohibits construction activities from 9:00 p.m. to 6:00 a.m., Monday through Friday (including federal holidays), and before 8:00 a.m. or after 9:00 p.m. on weekends. The City does not have an established noise threshold for construction noise. The FTA provides criteria for acceptable construction noise levels and recommends a daytime noise threshold of 80 dBA Leq for residential uses, 85 dBA Leq for commercial uses, and 90 dBA Leq for industrial uses. For the purposes of this analysis, the FTA criterion is used for nearby receptors.

Stationary Noise
The City’s General Plan Noise Element establishes exterior noise levels based on receiving land use. Residential areas shall not exceed an exterior daytime noise level of 75 dBA Lmax or 55 dBA L50 and an exterior nighttime noise level of 70 dBA Lmax or 50 dBA L50. These exterior noise standards are used to determine impact significance at nearby sensitive receptors.

Vibration
The City does not have specific thresholds for vibration-induced architectural damage related to construction activities. The FTA provides criteria for acceptable levels of ground-borne vibration for various types of buildings. Therefore, to determine impact significance, the FTA criteria was used for this analysis. These criteria are shown in 4.13-6, Groundborne Vibration Criteria:

Architectural Damage. For purposes of this analysis, the threshold of 0.2 PPV (in/sec) will be used to determine impact significance for building vibration damage to residential uses and 0.3 PPV (in/sec) will be used for commercial buildings.

Table 4.13-6 Groundborne Vibration Criteria: Architectural Damage Building Category PPV (in/sec)
I. Reinforced concrete, steel, or timber (no plaster) 0.5 II. Engineered concrete and masonry (no plaster) 0.3
III. Nonengineered timber and masonry buildings 0.2
IV. Buildings extremely susceptible to vibration damage 0.12 Source: FTA 2018.

Note: PPV = peak particle velocity
Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-12
The City does not have specific thresholds for vibration-induced annoyance related to construction activities. The FTA provides criteria for acceptable levels of ground-borne annoyance. Therefore, to determine impact significance, the FTA criteria were used for this analysis. These criteria are shown in Table 4.13-7, Groundborne Annoyance Criteria.

According to FTA’s Transit Noise and Vibration Impact Assessment Manual, a vibration velocity (VdB) of 75 to 85 VdB will annoy individuals. For purposes of this analysis, the threshold of 75 VdB was used to determine impact significance for human vibration annoyance for residential uses and 85 VdB was used for commercial uses.

Table 4.13-7 Groundborne Annoyance Criteria
Vibration
Velocity Level
Noise Level
Human Response
Low Frequency Mid Frequency
65 VdB 25 dBA 40 dBA
Approximate threshold of perception for many
humans. Low-frequency sound: usually inaudible. Mid-frequency sound: excessive for quiet sleeping areas. 75 VdB 35 dBA 50 dBA
Approximate dividing line between barely perceptible
and distinctly perceptible. Many people find transit
vibration at this level annoying. Low-frequency noise:
tolerable for sleeping areas. Mid-frequency noise:
excessive in most quiet occupied areas.
85 VdB 45 dBA 60 dBA
Vibration tolerable only if there are an infrequent
number of events per day. Low-frequency noise:
excessive for sleeping areas. Midfrequency noise:
excessive even for infrequent events for some
activities.

Source: FTA 2018, Table 5-5.

Notes: Low Frequency= Approximate noise level when vibration spectrum peak is near 30 hertz (Hz).

Mid Frequency= Approximate noise level when vibration spectrum peak is near 60 Hz.

Project Impacts
NOI-1: The proposed project’s construction activities would result in temporary noise increases in the vicinity of the project site that would not exceed applicable standards. [Threshold N-1]
Impact Analysis
Construction
The transport of workers and materials to and from the construction site would incrementally increase noise levels along Rosedale Highway. Individual construction vehicle pass-bys may create momentary noise levels of up to approximately 85 dBA (Lmax) at 50 feet from the vehicle, but these occurrences would generally be infrequent and short-lived. Based on data provided by the applicant, the Project would generate up to 264 combined temporary worker and vendor daily trips during the overlapping building construction and site preparation phases. A maximum of 140 daily haul truck tips is estimated during off-site improvements. Existing trips along Rosedale Highway are over 20,000 ADT. The addition of these construction trips would be temporary and would not substantially increase ambient noise levels. When compared to the thousands of existing daily trips along Rosedale Highway and Coffee Road, the traffic noise increase would be less than 0.1 dBA CNEL. Therefore, the Project would have a less than significant impact.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-13
Construction Equipment
Noise generated by on-site construction equipment is based on the type of equipment used, its location relative to sensitive receptors, and the timing and duration of noise-generating activities.

Each phase of construction involves different types of equipment and has distinct noise characteristics. Noise levels from construction activities are typically dominated by the loudest pieces of equipment. The dominant equipment noise source is typically the engine, although work-piece noise (such as dropping of materials) can also be noticeable.

The Project would be constructed in two phases. Each phase has its own set of construction activities; however, they all have similar equipment mixes in each activity (e.g., site preparation, demolition, and paving). This construction noise analysis modeled the worst-case phase in terms of number of equipment, equipment noise levels, and proximity to off-site sensitive receptors. The noise produced by each activity is determined by combining the Leq contributions from the top three loudest pieces of equipment used at a given time while accounting for the ongoing time variations of engine under load (commonly referred to as the usage factor). Heavy equipment, such as a dozer or a loader, can have maximum, short-duration noise levels of up to 85 dBA at 50 feet. However, overall noise emissions vary considerably, depending on the specific activity at any given moment.

Noise attenuation due to distance, the number and type of equipment, and the load and power requirements to accomplish tasks at each construction phase would result in different noise levels at a given receptor. Since noise from construction equipment is intermittent and diminishes at a rate of at least 6 dBA per doubling of distance (conservatively ignoring other attenuation effects from air absorption, ground effects, and shielding effects), the average noise levels at noise-sensitive receptors could vary considerably as mobile construction equipment moves around the site (site of each development phase) with different loads and power requirements. The City of Bakersfield does not have an established construction noise threshold. Therefore, the FTA criterion of 80 dBA Leq is used to determine impact significance at off-site sensitive receptors and 85 dBA Leq is used for off-site non-noise sensitive receptors.

Construction noise levels associated with the Project were modeled using RCNM from the acoustical center of the construction activity area to the nearest sensitive receptors. Equipment for grading and site preparation is modeled at spatially averaged distances (i.e., from the acoustical center of the general construction site to the property line of the nearest receptors) because the area around the center of construction activities best represents the potential average construction-related noise levels at the various sensitive receptors for mobile equipment.

Building construction and architectural coating are measured from the edge of the proposed buildings to the nearest sensitive receptors. Additionally, paving is measured from the nearest paving areas to the nearest sensitive receptors. Construction noise modeling does not account for existing masonry walls at nearby residential property lines (e.g., single-family residential uses to the southwest along El Toro Viejo Road), which could provide up to 6 dBA reduction based on existing wall heights. Results are summarized in 4.13-8, Phase 1 Project-Related Construction Noise, dBA Leq, and Table 4.13-9, Phase 2 Project-Related Construction Noise, dBA Leq.

As demonstrated in Tables 4.13-8 and 4.13-9, construction noise levels due to development of Phase 1 and Phase 2 of the Project would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, Project related construction noise impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-14
Table 4.13-8 Phase 1 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM
Reference
Noise
Level
Nearest Off-Site Receptors
Commercial
Receptor to
North
Commercial
Receptor to
East
Residential
Receptor to
South
Commercial
Receptor to
West
Distance in feet: 50 300 580 275 225
Site Prep 84 68 62 69 71
Rough Grading 84 69 63 70 71
Fine Grading 83 67 61 68 70
Distance in feet: 50 215 415 380 70
Building Construction 75 62 56 57 72
Architectural Coating 77 64 58 59 74
Distance in feet: 50 180 395 130 55
Paving 79 68 61 71 78
Distance in feet: 50 200 415 185 65
Utilities Trenching 81 69 62 69 78
Maximum dBA Leq 69 63 71 78
Exceeds FTA Threshold? 1 No No No No
Notes: Calculations with the FHWA RCNM software are in Appendix G 1 FTA Thresholds: 80 dBA residential, 85 dBA commercial Table 4.13-9 Phase 2 Project-Related Construction Noise, dBA Leq Construction
Activity Phase
RCNM
Reference
Noise Level
Nearest Off-Site Receptors
Commercial
Receptor to North
Commercial
Receptor to East
Residential
Receptor to West
Distance in feet: 50 1,350 585 1,950
Site Prep 84 55 62 52
Rough Grading 84 56 63 53
Fine Grading 83 54 61 51
Distance in feet: 50 1,200 505 1,825
Building Construction 75 47 54 43
Architectural Coating 77 49 57 45
Distance in feet: 50 1,150 465 1,770
Paving 79 52 60 48
Utilities Trenching 81 53 62 50
Maximum dBA Leq 56 63 53 53
Exceeds FTA
Threshold? 1
No No No No
Notes: Calculations with the FHWA RCNM software are in Appendix G. 1 FTA Thresholds: 80 dBA residential, 85 dBA commercial Construction Noise from Off-Site Roadway Improvements
As a part of the Project, various roadway improvement would be implemented along Rosedale Highway and Coffee Road. These off-site improvements would require construction equipment, including but not limited to water trucks, loaders, pavers, rollers, air compressors, tractors, scrapers, and graders. Construction activities from roadway improvements would not expose surrounding sensitive receptors to prolonged periods of construction noise. Though some equipment could reach up to 85 dBA Leq at a distance of 50 feet, construction for the off-site improvements would progress in a linear fashion, generating less noise at each receptor each Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-15
day. The nearest off-site sensitive receptor is approximately 700 feet south of the proposed roadway improvements and noise levels would be up to 62 dBA Leq. Additionally, off-site roadway improvements would be temporary and anticipated to last a limited period—22 work days—and would not occur during nighttime hours. Construction noise levels due to off-site roadway improvements of the Project would be below the FTA thresholds for residential (80 dBA Leq) and commercial uses (85 dBA Leq). Therefore, Project related off-site roadway improvements construction noise impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

NOI-2: Project implementation would result in long-term, operation-related noise that would not exceed local standards. [Threshold N-1] Impact Analysis
Mobile-Source Noise Impacts
A project will normally have a significant effect on the environment related to noise if it substantially increases the ambient noise levels at adjoining areas. Most people can detect changes in sound levels of approximately 3 dBA under normal, quiet conditions, and changes of 1 to 3 dBA under quiet, controlled conditions. Changes of less than 1 dBA are usually indiscernible. A change of 5 dBA is readily discernible to most people in an exterior environment.

Noise levels above 65 dBA CNEL are normally unacceptable at sensitive receptor locations such as residences, schools, and noise environments in these areas would be considered degraded.

Based on this, a significant impact would occur if the following traffic noise increases occur relative to the existing noise environment or exceed 65 dBA CNEL. The Project traffic analysis included 26 study roadway segments in the project vicinity. Table 4.13-10, Project and Cumulative Traffic Noise Increase, shows that the estimated project and cumulative traffic noise increase over existing conditions at the 26 study roadway segments would be up to 0.4 dBA CNEL. As shown in the table, the Project would not exceed the 1.5 dBA minimum threshold. In addition, the estimated cumulative related traffic noise increase would be less than 1 dBA CNEL and the contribution from the Project would also be less 1 dBA CNEL. As shown in Table 4.13-10, the Project would comply with General Plan Noise Element Implementation 10. Therefore, Project related traffic noise impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-16
This page intentionally left blank.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-17
Table 4.13-10 Project and Cumulative Traffic Noise Increase Roadway Segment
Traffic Noise Increase in dBA CNEL
2027 No
Project
2027 with
Proposed
Project Increase
2028 No
Project
2028 with
Proposed
Project Increase
2046 No
Project
2046 with
Proposed
Project Increase
Rosedale Highway (CA-58) Old Farm Road to Verdugo Lane 73.3 73.5 0.2 73.3 73.5 0.2 73.3 73.5 0.2 Rosedale Highway (CA-58) Verdugo Lane to Calloway Drive 73.9 74.2 0.2 73.9 74.2 0.2 73.9 74.2 0.3 Rosedale Highway (CA-58) Calloway Drive to El Toro Viejo Road/Clay Patrick Farr Way

75.1 75.4 0.3 75.1 75.4 0.3 75.1 75.5 0.4
Rosedale Highway (CA-58) El Toro Viejo Road/Clay Patrick Farr Way to Northwest Promenade

75.3 75.7 0.4 75.3 75.7 0.4 75.3 75.7 0.5
Rosedale Highway (CA-58) Northwest Promenade to Coffee Road 75.4 75.6 0.2 75.4 75.6 0.2 75.4 75.6 0.3 Rosedale Highway (CA-58) Coffee Road to Patton Way 74.9 75.0 0.1 74.9 75.0 0.1 74.9 75.0 0.1 Coffee Road Olive Drive to Hageman Road 75.0 75.2 0.2 75.1 75.2 0.1 75.7 75.9 0.2 Coffee Road Hageman Road to Meany
Avenue/Riverlakes Drive

75.8 76.0 0.2 75.8 76.0 0.1 76.5 76.7 0.2
Coffee Road Riverlakes Drive/Meany Avenue to
Downing Avenue

76.7 76.9 0.2 76.7 76.9 0.2 77.4 77.6 0.2
Coffee Road Downing Avenue to Granite Falls
Drive

76.9 77.1 0.2 77.0 77.1 0.2 77.6 77.9 0.2
Coffee Road Granite Falls Drive to Rosedale
Highway (CA-58)

76.7 76.9 0.2 76.7 76.9 0.2 77.3 77.6 0.3
Coffee Road Rosedale Highway (CA-58) to Jet Way 77.4 77.6 0.2 77.4 77.6 0.2 78.0 78.3 0.2 Coffee Road Jet Way to Brimhall Road 77.5 77.9 0.5 77.5 77.9 0.4 78.1 78.6 0.5 Coffee Road Brimhall Road to Westside Parkway
EB Ramps

78.3 78.4 0.2 78.3 78.4 0.1 78.9 79.0 0.2
Coffee Road Westside Parkway EB Ramps to
Truxtun Road

77.5 77.7 0.2 77.5 77.7 0.2 78.1 78.3 0.2
Coffee Road Truxtun Road and Stockdale Highway 78.2 78.4 0.1 78.2 78.4 0.1 78.3 78.5 0.2 Calloway Drive Noriega Road to Hageman Road 75.4 75.4 0.1 75.4 75.4 0.0 75.9 75.9 0.1 Calloway Drive Hageman Road to Meacham Road 75.5 75.6 0.1 75.6 75.6 0.1 75.6 75.7 0.1 Calloway Drive Meacham Road to Rosedale Highway
(CA-58)

75.8 75.9 0.1 75.8 75.9 0.1 75.9 76.0 0.1
Calloway Drive Rosedale Highway (CA-58) to Brimhall
Road

76.7 76.8 0.1 76.7 76.8 0.1 77.0 77.1 0.1
Brimhall Road Allen Road to Old Farm Road 69.3 69.5 0.2 69.3 69.5 0.2 69.7 69.9 0.2 Brimhall Road Old Farm Road to Jewetta Avenue 70.1 70.4 0.3 70.1 70.4 0.2 70.6 70.8 0.3 Brimhall Road Jewetta Avenue to Verdugo Lane 70.8 71.2 0.4 70.9 71.2 0.3 71.3 71.7 0.4 Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-18
Roadway Segment
Traffic Noise Increase in dBA CNEL
2027 No
Project
2027 with
Proposed
Project Increase
2028 No
Project
2028 with
Proposed
Project Increase
2046 No
Project
2046 with
Proposed
Project Increase
Brimhall Road Verdugo Lane to Calloway Drive 71.6 71.9 0.3 71.6 71.9 0.3 72.0 72.4 0.4 Brimhall Road Calloway Drive to Harvest Creek Road 71.9 72.3 0.4 71.9 72.3 0.4 72.4 72.8 0.5 Brimhall Road Harvest Creek Road to Coffee Road 72.3 72.8 0.4 72.4 72.8 0.4 73.0 73.4 0.4 Hageman Road Calloway Drive to Coffee Road 73.3 73.5 0.2 73.3 73.5 0.2 73.3 73.5 0.2 Source: Project traffic provided by IEG (2025). .

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-19
Stationary-Source Noise Impacts
Car Wash
The Project includes the development of a car wash near the northwestern end of the Project Site. The car wash would generate noise at the nearby receptors primarily due to vacuums and the tunnel dryers. Dryer and vacuum noise levels decrease by approximately 6 dBA for each doubling of distance from the source (not including ground attenuation effects and shielding factors). The analysis below uses the City’s 75 dBA Lmax or 55 dBA L50 daytime and 70 dBA Lmax or 50 dBA L50 nighttime exterior noise standards to determine impact significance at nearby sensitive receptors. It should be noted that Leq noise levels represent a steady state sound level containing the same total energy as a time varying signal over a given sample period.

Vacuum Noise
Noise measurements from a car wash study with similar layout, equipment, and capacity were conducted. Based on these measurements, noise from unholstered, in-use vacuums was 64 dBA at a distance of 40 feet. Typically, the average person uses a vacuum for 5 minutes, and 60 percent of the vacuums are conservatively assumed to operate at once, which would be 13 vacuums. The simultaneous use of 13 vacuums would equal approximately 75 dBA at 40 feet.

The nearest residential receptor to the proposed vacuum stalls is approximately 780 feet southwest and the nearest commercial receptor is approximately 345 feet to the north. Vacuum stall noise levels at the nearest residential receptor would be approximately 49 dBA, and approximately 56 dBA at nearest commercial use to the north, without accounting for shielding provided by the proposed storage building and proposed Pad 2 building. Conservatively assuming a 3 dBA reduction to account for shielding that would be provided by the current site plan showing an on-site storage building and 8 dBA reduction to account for shielding that would be provided by the Pad 2 building, vacuum stall noise levels would be approximately 45 dBA at the nearest residential receptor and 48 dBA at the nearest commercial receptor.

Tunnel Dryer
Tunnel dryers are typically placed one to two feet within the car wash exit structure. Dryer noise levels are approximately 80 dBA at 30 feet, based on previous PlaceWorks car wash measurements. The nearest residential receptor to the tunnel dryer is approximately 780 feet southwest and the nearest commercial receptor is approximately 265 feet to the north. Tunnel dryer noise levels at the nearest residential receptor would be approximately 52 dBA, and approximately 61 dBA at the nearest commercial use to the north, without accounting for shielding provided by the proposed storage building. Conservatively assuming a 5 dBA reduction to account for shielding that would be provided by the on-site storage building, tunnel dryer noise levels would be approximately 47 dBA at the nearest residential receptor.

Table 4.13-11 shows approximate car wash noise levels at the nearest sensitive receptors with the operation of the Project. These calculations conservatively take into account shielding from proposed on-site buildings. Ambient noise monitoring indicates that existing ambient noise levels currently exceed the daytime noise standard.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-20
Table 4.13-11 Attenuated Noise Levels at Sensitive Receptors, dBA Lmax Reference Noise Source
Reference Noise
Level
Commercial to
North1, 2 Residential to South1
Distance in feet 40 345 770
Vacuum on (unholstered) 64 48 45
Distance in feet 30 265 780
Tunnel dryers 80 61 47
Cumulative Noise Level 61 49
Measured L50 (Existing Ambient)3

73.9 57.6
Measured Lmax (Existing Ambient)3
101.8 83.5
Note: dBA = A-weighted Sound Pressure Level.

Noise levels rounded up or down to the nearest whole number. 1 Distance measured from the center of vacuum stalls and tunnel dryers to nearest receptor (based on site plans provided by applicant). 2 Accounts for shielding from on-site structures.
3 See Table 7 for ambient noise measurements.

As shown in Table 4.13-11, existing ambient L50 and Lmax noise levels currently exceed daytime and nighttime City thresholds. Referenced car wash equipment manufacturer specifications noise levels are shown in Lmax, the attenuated noise levels in Table 4.13-11 represent Lmax values that are evaluated against the City's Lmax exterior noise standard. Cumulative vacuum and tunnel dryer Lmax noise levels would not exceed the existing ambient noise levels at the nearest residential receptor to the southwest and commercial uses to the north. Proposed Project car wash operational noise levels would not exceed the City’s 75 dBA Lmax daytime and 70 dBA Lmax nighttime exterior noise standards. Furthermore, Leq noise levels represent a steady state sound level containing the same total energy as a time varying signal over a given sample period.

Conservatively assuming Table 4.13-11 Lmax car wash noise levels occurred 50% over a given sample period, operational noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards as well. In addition, car wash operational noise would be less than the existing ambient noise by approximately 8 dBA to 12 dBA. Therefore, Project related operational car wash noise impacts would be less than significant.

Loading and Unloading
The Project includes a mix of commercial and retail uses that would include loading and unloading activities. The nearest residential receptor is approximately 1,800 feet west from the nearest proposed retail building with loading docks. PlaceWorks staff collected noise measurements for loading dock operations with trailers that have truck refrigeration units (TRU). Measurements data showed a single TRU generated average noise levels of 63.0 dBA L50 at 20 feet. The nearest “Major Retail” buildings support three trailers at each loading dock. At a distance of 1,800 feet, operations from a single TRU would attenuate to approximately 24 dBA L50. When accounting for three TRUs operating simultaneously, noise would be up to 29 dBA L50 at the nearest residences.

Assuming all seven Major Retail loading docks were operating simultaneously, noise would be up to 38 dBA L50 at the nearest residences. Proposed project loading and unloading operational noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards. In addition, loading dock operational noise would be less than the existing ambient noise. Therefore, Project related operational loading dock noise impacts would be less than significant.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-21
Mechanical Equipment
The Project would include the use of rooftop heating, ventilation, and cooling (HVAC) systems for the commercial and retail buildings. HVAC equipment would be no closer than 360 feet from the nearest receptor property line. Typical HVAC noise is approximately 72 dBA at a distance of 3 feet (York 2026). At 360 feet, HVAC noise would attenuate to approximately 30 dBA Leq. Because HVAC mechanical equipment is a steady-state noise source, the Leq would not vary considerably from the L50. Therefore, HVAC noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards. Additionally, HVAC noise levels would be below the existing ambient noise level of 67.3 dBA Leq at the nearest residence. Therefore, Project related operational HVAC noise impacts would be less than significant.

Drive-Thru Operations
The Project would include multiple drive-thru restaurants with varying hours of operation. Noise associated with drive-thru windows would be predominantly from the speaker boxes. Field measurements measured typical drive-thru speaker box noise at approximately 73.6 dBA L50 at four feet. The closest noise-sensitive receptor to a proposed drive-thru speaker box is approximately 650 feet southwest, adjacent to Rosedale Highway on the north side of the proposed Pad 1. At 650 feet, noise levels would attenuate to approximately 52 dBA L50, without accounting for shielding provided by the proposed Pad 1 building. Conservatively assuming an 8 dBA reduction to account for shielding that would be provided by the Pad 1 building, speaker box noise levels would be approximately 46 dBA L50 at the nearest noise sensitive receptors.

Therefore, speaker box noise levels would not exceed the City’s 55 dBA L50 daytime and 50 dBA L50 nighttime exterior noise standards, and impacts would be less than significant.

Combined Stationary Source Noise
Ambient noise levels measured 67.3 dBA Leq, 57.6 dBA L50, and 83.5 dBA Lmax at the nearest residence to the Project Site. The combined noise level from the operation of the Project at the nearest residence to the southwest would be approximately 51 dBA L50, when accounting for existing and proposed intervening structures. Combined Project noise levels would not exceed the City’s 55 dBA L50 daytime exterior noise standard at the nearest noise sensitive residential use to the southwest. Project operational hours would not extend past 10:00 PM on any given day, which would result in combined stationary noise levels that would comply with the 50 dBA L50 nighttime exterior noise standard at the nearest noise sensitive residential use to the southwest. Additionally, combined noise levels would be below existing ambient noise levels.

Therefore, combined stationary noise impacts would be less than significant.

Mitigation Measures
None required.

Level of Significance After Mitigation
Less than significant with no mitigation required.

Riverview Marketplace Commercial Project
Environmental Impact Report 4.13 Noise
City of Bakersfield – SCH No. 2025101507 4.13-22
NOI-3 The project would not create excessive short-term or long-term groundborne vibration and groundborne noise. [Threshold N-2] Impact Analysis
Construction Vibration
Potential vibration impacts associated with development projects are usually related to the use of heavy construction equipment during the demolition and grading phases of construction.

Construction can generate varying degrees of ground vibration depending on the construction procedures and equipment. Construction equipment generates vibration that spreads through the ground and diminishes with distance from the source. The effect on buildings in the vicinity of the construction site varies depending on soil type, ground strata, and receptor-building construction.

The effects from vibration can range from no perceptible effects at the lowest vibration levels, to low rumbling sounds and perceptible vibrations at moderate levels, to slight structural damage at the highest levels. Vibration from construction activities rarely reaches the levels that can damage structures. Pile driving is not proposed.

Architectural Damage
The FTA criteria for architectural damage vary based on the building category. The applicable FTA threshold for the surrounding off-site commercial structures is 0.30 in/sec PPV, and the applicable FTA threshold for residential uses is 0.20 in/sec PPV. At a distance greater than approximately 20 feet, construction-generated vibration levels at the commercial buildings would be less than the 0.30 in/sec PPV threshold, and at a distance greater than approximately 25 feet, vibration levels would be less than the 0.20 in/sec PPV threshold. To determine potential vibration-induced architectural damage, the distance from the vibration source (construction equipment) to the vibration-sensitive receptors (commercial/residential buildings) is measured from the edge of the construction site to the nearest building façade.

← All documents from this meeting