Cities Index.
Agenda packet

Baldwin Park City Council
June 3, 2026

Document
Agenda packet
Meeting
June 3, 2026
Body
Baldwin Park City Council
Pages
325
Original file
38.6 MB
Text extracted from the city's file for reading and search. Open the original on baldwinparkca.api.civicclerk.com. That file is the official record.

BOARD AGENDA MEMO

“Ensure High Achievement for ALL Learners”
Meeting Date:

May 12, 2026
Submitted by: Marc W. Chaldu, Associate Superintendent, Business Services Prepared by:

Nancy Rodriguez, Director of Risk Management & Safety Response Subject: Approval of the Memorandum of Agreement between the Baldwin Park Unified School District and the City of Baldwin Park to Provide Crossing Guard Services, Effective July 1, 2026, through June 30, 2027

Type: Action (Consent)

BACKGROUND
As of the 2021-2022 school year, the Baldwin Park Unified School District (District) and the City of Baldwin Park established a Memorandum of Agreement (MOA) to provide students in the community with crossing guard services at designated school sites. The MOA designates that the District and the City of Baldwin Park will each pay half of the costs for crossing guard services, working together to provide safe routes to school for students and families before and after school.

The term of this MOA will be in effect from July 1, 2026, through June 30, 2027. At this time, both entities have reviewed the MOA and agreed to continue services for the upcoming school year. A copy of the MOA is available for review in the Office of the Associate Superintendent of Business and Operations.

FISCAL IMPACT
The City of Baldwin Park will invoice the District for services to be provided within the 2026-27 school year. The total cost of services will not exceed $178,000 and will be paid from LCAP Safety Funds: (Goal 2 - Action 3, Safe, Secure, and Peaceful Schools).

RECOMMENDATION
Marc W. Chaldu recommends Approval of the Memorandum of Agreement between the Baldwin Park Unified School District and the City of Baldwin Park to Provide Crossing Guard Services, Effective July 1, 2026, through June 30, 2027.

Page 120 of 325 ends
Page 1 ends

ITEM NO: 10.

STAFF REPORT

TO: Honorable Mayor and Members of the City Council
FROM: Manuel Carrillo Jr, Chief Executive Officer
Daniel Padilla, Director of Public Works
PREPARED BY: Daniel Padilla, Director of Public Works
DATE: June 3, 2026

SUBJECT: Authorize Award of Contract to Contractor for Barnes Park Multi-Benefit Stormwater Capture Project: Sod
Replacement & Soil Preparation (CIP No. 21-129 Phase C)

SUMMARY:

This item will authorize the award of the Barnes Park Multi-Benefit Stormwater Capture Project: Sod Replacement and Soil Preparation (CIP No. 21-129 Phase C) to Contractor. The project consists of 69,500 square feet of soil preparation and sod replacement.

RECOMMENDED ACTION:

It is recommended that the City Council:

1. Approve and award the construction contract for the Barnes Park Multi-Benefit Stormwater Capture Project: Sod Replacement and Soil Preparation (CIP No. 21-129 Phase C) to SGD Enterprises dba Four Seasons Landscaping in the amount of $150,450.00; and

2. Approve a 13% construction contingency in the amount of $19,550.00 for the project; and

3. Authorize the Mayor and City Clerk to execute the contract with SGD Enterprises dba Four Seasons Landscaping, subject to any revisions deemed necessary by the City Attorney; and

4. Authorize the Director of Finance to make appropriations and budget adjustments as necessary.

FISCAL IMPACT:

There is no impact on the General Fund. The project will use CIP Project Funds that have been previously approved for Barnes Park as listed below:

234-50-520-58100-55001
255-50-520-58100-55001
258-50-520-58100-55001
270-50-520-58100-55001

BACKGROUND:

The Barnes Park Multi-Benefit Stormwater Capture Project was awarded to Zusser Company in March 2024. The scope of work of the Zusser Company contract included soil preparation and sod replacement, but the work has not been completed in accordance with the project plans, specifications, and contract. The City has issued Zusser Company a Notice of Default and has communicated that the City will hire a contractor to perform this work, and Zusser will be responsible for all costs associated with this work.

DISCUSSION:

The City bid the Barnes Park Multi-Benefit Stormwater Capture Project: Sod Replacement and Soil Preparation (CIP No. 21-129 Phase C) on May 28, 2026. The City obtained 3 bids. The lowest responsible and responsive

Page 121 of 325 ends
Page 2 ends

bidder was SGD Enterprises dba Four Seasons Landscaping out of Van Nuys, CA.

ALTERNATIVES:

1. The City Council may choose not to award a construction contract, reject all bids, and re-bid the project. This action is not recommended as re-bidding the project will delay the work and may result in increased costs.

2. Provide Staff with alternate direction.

CEQA REVIEW:

The subject project is exempt from the California Environmental Quality Act (CEQA) pursuant to a Class 1 (Section 15201, Existing Facilities), subsection (c) exemption, which includes the repair, maintenance, and/or minor alteration of existing highways and streets, sidewalks, gutters, bicycle and pedestrian trails, and similar facilities (this includes road grading for the purpose of public safety). The key consideration for a Class 1 exemption is whether the project involves negligible or no expansion of an existing use.

LEGAL REVIEW:

This report has been reviewed and approved by the City Attorney as to legal form and content.

ATTACHMENTS:

1. Opening Bid Sheet- Phase C- Barnes Park Multi- Benefits

2. SGD Enterprises Landscaping- Bid Proposal - CIP 20-129 Phase C - Barnes Park

3. RFP Barnes Park Muti Benefit - Sod Replacement CIP 21-198

Page 122 of 325 ends
Page 123 of 325 ends
Page 124 of 325 ends
Page 125 of 325 ends
Page 126 of 325 ends
Page 127 of 325 ends
Page 128 of 325 ends
Page 129 of 325 ends
Page 130 of 325 ends
Page 131 of 325 ends
Page 132 of 325 ends
Page 133 of 325 ends
Page 134 of 325 ends
Page 135 of 325 ends
Page 136 of 325 ends
Page 137 of 325 ends
Page 138 of 325 ends
Page 139 of 325 ends
Page 140 of 325 ends
Page 141 of 325 ends
Page 142 of 325 ends
Page 143 of 325 ends
Page 144 of 325 ends

CITY OF BALDWIN PARK
Public Works Department

NOTICE INVITING BIDS

INSTRUCTIONS TO BIDDERS AND BID DOCUMENTS

CONTRACT DOCUMENTS AND SPECIFICATIONS

FOR

CITY PROJECT NO. CIP 20-129 Phase C

SOD REPLACEMENT AND SOIL PREPARATION FOR

BARNES PARK MULTI-BENEFIT STORMWATER CAPTURE PROJECT

BID OPENING: Thursday, May 28, 2026 at 2:00pm

Daniel Padilla Date 5/12/2026 Public Works Director

Page 145 of 325 ends

i

TABLE OF CONTENTS

A. NOTICE INVITING SEALED BIDS ............................................................................................. A-1 INSTRUCTIONS TO BIDDERS ................................................................................................... A-4 Information to Bidders ................................................................................................................. A-4

B. BID DOCUMENTS .......................................................................................................................... B-1 Contractor’s Bid Proposal ............................................................................................................. B-1 Bid Schedule ................................................................................................................................... B-3 Designation of Sub-Contractors ................................................................................................. B-18 Bid Bond ........................................................................................................................................ B-19 Ownership Affidavit ................................................................................................................... B-21 Non-Collusion Affidavit ............................................................................................................. B-22 Technical Ability and Experience .............................................................................................. B-23 Certification of Principal ............................................................................................................. B-24 Equal Employment Opportunity Certification ........................................................................ B-25 Public Contract Code Section 10162 Questionnaire ................................................................ B-26 Public Contract Code Section 10285.1 Statement .................................................................... B-27 Public Contract Code Section 10232 Statement ....................................................................... B-28 Contractor’s Registration Law ................................................................................................... B-29 Bidders Guarantee ...................................................................................................................... B-30

C. CONTRACT DOCUMENTS ........................................................................................................... C-1 Contract Service Agreement ......................................................................................................... C-1 Faithful Performance Bond ......................................................................................................... C-17 Laor and Material Payment Bond ............................................................................................. C-19 Warranty Bond ............................................................................................................................. C-21 Supplemental Information to be Completed by Principal ..................................................... C-23 Tax Identification Number ......................................................................................................... C-24 Guarantee ...................................................................................................................................... C-25 Equals ............................................................................................................................................ C-26

D. SPECIFICATIONS ........................................................................................................................... D-1 Definition .......................................................................................................................................... D-1 Special Provisions ............................................................................................................................ D-1 PART 1 GENERAL PROVISIONS ............................................................................................... D-1 Section 1 – General ..................................................................................................................... D-1 Section 2 – Scope of Work.......................................................................................................... D-3 Section 3 – Control of the Work ................................................................................................ D-8 Section 4 – Control of Materials .............................................................................................. D-16 Section 5 – Legal Relations and Responsibilities .................................................................. D-16 Section 6 – Prosecution and Progress of the Work .............................................................. D-20 Section 7 – Measurement and Payment ................................................................................. D-24

Page 146 of 325 ends

ii
Section 8 – Facilities for Agency Personnel ........................................................................... D-27

Technical Provisions ..................................................................................................................... D-28 General Nature of Work .......................................................................................................... D-28 Plans and Technical Specifications ......................................................................................... D-28 Interpretation of Specifications ............................................................................................... D-28 Contractor License .................................................................................................................... D-28 Construction Materials ............................................................................................................ D-28 PART 2 CONSTRUCTION MATERIALS ............................................................................. D-29 Section 200 – Rock Materials ................................................................................................ D-29 Section 201 – Concrete, Mortar, and Related Materials ................................................... D-29 Section 203 – Bituminous Materials .................................................................................... D-30 Section 206 – Miscellaneous Metal Items ........................................................................... D-30 PART 3 CONSTRUCTION METHODS................................................................................. D-31 Section 300 – Earthwork ....................................................................................................... D-31 Section 301 – Subgrade Preparation, Treated Materials, and Placement of Base Materials .................................................................................................................................................. D-33 Section 302 – Roadway Surfacing ....................................................................................... D-33 Section 303 – Concrete and Masonry Construction .......................................................... D-34 Section 304 – Metal Fabrication and Construction ........................................................... D-36 Section 306 – Open Trench Conduit Construction ........................................................... D-36 Section 314 – Traffic Striping, Curb and Pavement Markings, and Pavement Markers ..... .................................................................................................................................................. D-39 PART 4 EXISTING IMPROVEMENTS .................................................................................. D-40 Section 400 – Protection and Restoration ........................................................................... D-40 Section 401 – Removal .......................................................................................................... D-40 Section 402 – Utilities ............................................................................................................ D-43

Technical Specifications ................................................................................................................ D-46 Stormwater Treatment (SWT) ................................................................................................. D-46 Stormwater Infiltration System (SWI) ................................................................................... D-51 Flow Meter, Valve, and Miscellaneous Equipment ............................................................. D-56 Landscape and Surface Improvements Technical Specifications ...................................... D-66

Section 32 84 00 Irrigation System
Section 32 90 00 Landscaping
Section 32 92 23 Sodding
Section 32 93 95 90 Day Maintenance

Exhibit A – Schedule of Performance and Time of Completion ........................................... D-69 Exhibit B – Solid Waste Reporting ............................................................................................. D-70 Exhibit C – Specification Appendix........................................................................................... D-72 Referenced Standard Plans ...................................................................................................... D-73 Caltrans Encroachment Permit Documents .......................................................................... D-74

Page 147 of 325 ends

iii
Geotechnical Report (for Reference Only) ............................................................................ D-76 Storm Drain As-Built Plans ..................................................................................................... D-77 Exhibit D – Federal Prevailing Wage ........................................................................................ D-78 Exhibit E – Countywide Local and Targeted Worker Hiring Policy .................................. D-111

Page 148 of 325 ends

A-1 (1)
Section A NOTICE INVITING SEALED BIDS

City Project No. CIP 20-129 Phase C

SOD REPLACMENT AND SOIL PREPARATION

BARNES PARK MULTI-BENEFIT STORMWATER CAPTURE PROJECT

PUBLIC NOTICE IS HEREBY GIVEN that the City of Baldwin Park invites sealed bids for the above-stated project, and will receive such bids in the offices of the City Clerk, 14403 Pacific Avenue, Baldwin Park, California 91706 , until Thursday, May 28, 2026 at 2:00 PM at which time the proposals will be publicly opened and read. Bidders and/or authorized agents are invited to be present. All information submitted with the bid is public information and may be subject to disclosure. Prospective Bidders may obtain all construction documents, addendum, and/or submit questions by accessing the link to protect on PlanetBids as https://vendors.planetbids.com/portal/55389/bo/bo-search.

Project Description – The work consists of removing and disposing of 69,500 square feet of hybrid Bermuda sod, rototilling the area to a depth of 8 inches, removing and disposing of approximately 80 CY of rock and debris in the upper 8 inches of soil, amend soil per agronomist testing, perform final agronomist testing after soil amending, install hybrid Bermuda sod suitable for heavy soccer use, and minor irrigation repairs as needed.

Bid Proposals – Bids shall be sealed and plainly marked “City Project No. CIP 20-129 Phase C, Sod Replacement and Soil Preparation – Barnes Park Multi-Benefit Stormwater Capture Project.” Bids must be prepared using the Contractor’s Bid Proposal forms and all the other forms identified in the Instructions to Bidders. The forms required to complete a bid package are found in Section “B” of these Contract Documents. No bids will be accepted if not submitted using the approved forms. The Information to Bidders provides prospective bidders a summary of requirements for acceptance of bids, guidelines the City uses in awarding contracts, rules to ensure fairness in contractor procurement and guidelines to aid in interpretation of documents. The Construction Contract / Agreement define the Contract Documents which serve to control construction, work performed, and materials furnished, and includes the Specifications and Plans.

Plans, Specifications, Documents – Specifications and proposal forms may be obtained at the Engineering Division office located at 14403 East Pacific Avenue, Baldwin Park, CA 91706, (626) 960-4011. Electronic versions of the specifications and proposal forms can be obtained on the City’s website by clicking on “Bid Portal” under the “Public Works” tab.

Bid Security – Each bid must be accompanied by cash, certified check, cashier’s check, or bidder’s bond made payable to the City of Baldwin Park or issued by a surety admitted to do business in California, for an amount equal to at least ten percent (10%) of the amount bid. Such guaranty to be forfeited to the City of Baldwin Park should the bidder to whom the contract is awarded fail to enter into the contract. The City of Baldwin Park reserves the right to reject any and all bids and to waive any minor irregularities in the bid documents. Bidders may not withdraw their bid for a period of sixty (60) days after the opening date.

City Business License, Contractors License and Permit – Prior to contract execution, the contractor and his/her subcontractors shall obtain a City of Baldwin Park business license. In accordance with provisions of Section 3300 of the California Public Contract Code, the City has

Page 149 of 325 ends

A-2 (1)
determined that the Contractor shall possess a valid Class A or C27 California Contractor's License. Failure to possess such license may render the bid non responsive.

Prevailing Wages – In accordance with the provisions of Sections 1770 et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done. The Contractor will be required to pay to all persons employed on the project by the Contractor sums not less than the sums set forth in the documents entitled "General Prevailing Wage Determination made by the Director of Industrial Relations pursuant to California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1773, 1773.1." These documents can be reviewed in the office of the City Clerk or may be obtained from the State.

Contractor’s Registration – In accordance with Labor Code Section 1771.1, a contractor or subcontractor shall not be qualified to (a) bid on or be listed in a bid proposal on or after March 1, 2015, or (b) engage in the performance of this Work after April 1, 2015, unless currently registered with the Department of Industrial Relations and qualified to perform the Work pursuant to labor Code Section 1725.5.

Compliance Monitoring and Enforcement – Contractor’s performance of the Work described in this Notice Inviting Bids is subject to compliance monitoring and enforcement by the California Department of Industrial Relations.

Equivalent Securities – Pursuant to California Public Contract Code Section 22300, substitution of eligible and equivalent securities for any moneys withheld to ensure performance under the contract for the work to be performed will be permitted at the request and expense of the successful bidder, unless otherwise prohibited by law.

Worker Hire Policy – The Project is receiving funding from the Safe, Clean Water Program (SCWP) Regional Infrastructure Program. The Los Angeles County Code of Ordinances, Flood Control District Code, Chapter 18 – Safe, Clean Water Program Implementation, Section 18.09, item B.11 indicates that Projects funded through the Regional Program (such as this one) must apply and enforce provisions mirroring those set forth in the current version of the County’s Local and Targeted Worker Hire Policy, adopted by the County’s Board on September 6, 2016 as to contractors performing work on the Project. The City of Baldwin Park will utilize the County’s Policy, which is included in Exhibit E.

Page 150 of 325 ends

A-3 (1)

INSTRUCTIONS TO BIDDERS

The following forms must be completed and submitted with the Contractor’s Bid Proposal or the bid may be considered non-responsive:

1. Bid Proposal

2. Bid Schedule

3. Designation of Subcontractor

4. Bid Bond

5. Ownership Affidavit

6. Non-Collusion Affidavit

7. Technical Ability and Experience

8. Certification of Principal

9. Equal Employment Opportunity Certification

10. Public Contract Code Section 10162 Questionnaire

11. Public Contract Code Section 10285.1 Statement

12. Public Contract Code Section 10232 Statement

13. Contractor Registration Law

14. Bidders Guarantee

These documents are found in Section “B” of these Contract Documents.

INFORMATION TO BIDDERS

1. General – Each proposal must be submitted on the blank forms furnished herewith, and must be presented in a sealed envelope and filed prior to the time and date, and at the place designated in the Notice Inviting Bids. The proposal forms must be completely made out in the manner and form indicated therein, clearly and legibly showing the proposed unit prices in both words and numbers, the extended item totals in numbers, the total bid in both words and numbers, and must be properly signed by the bidder. The bidder’s address, telephone number and State Contractor’s License number must be included. The City Council reserves the right to reject any bid if all the above information is not furnished.

To be eligible to perform work, the bidder must be a Licensed California State Contractor in good standing prior to beginning work.

2. Opening of Bids – All bid proposals submitted as prescribed in the Notice Inviting Bids will be publicly opened and read immediately after the time set and at the place designated in the Notice Inviting Bids. Bidders and/or authorized agents are invited to be present. All information submitted with the bid is public information and may be subject to disclosure.

Page 151 of 325 ends

A-4 (1)

3. Bid Quotes and Unit Prices Extensions – The unit prices and the lump sum prices quoted by the bidder must be entered in words and numbers in the spaces provided on the Contractor’s Bid Proposal form. In case there is a discrepancy between a unit price as stated in words and a unit price as stated in numbers, in general, the unit price as stated in words shall govern.

However, the City reserves the right to use the extended price to determine the bidder’s intention. Similarly, in case there is a discrepancy between the sum total of the extended prices and the total amount bid, unit prices in both words and numbers shall be used to verify extended pricing and the total amount bid. The results shall be considered as representing the bidder’s intention, and the bid total shall be corrected.

If a Contractor’s Bid Proposal contains discrepancies that make it difficult or impossible to determine the bidder’s intention, then such bid may be considered unresponsive, in which case the bid may be disregarded, and bid guarantees returned without further consideration of awarding a contract for the proposed work.

4. Alternate Proposals – The City reserves the right to accept bids on work and alternatives listed in the bid form in sum total or individually or in any combination.

If the bidder fails to specify a subcontractor for any portion of the work to be performed under the contract in excess of one-half of one percent of the bidder’s total bid, or if the bidder specifies more than one subcontractor for the same portion of such work, he agrees to perform that portion himself. The successful bidder shall not, without the written consent of the City either:

a. Substitute any person, firm or corporation as subcontractor in place of the subcontractor designated in the original bid, or permit any subcontract to be assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the bid. b. Bids shall be accompanied by cash, a certified or cashier’s check, or an acceptable bidder’s bond for an amount not less than ten percent (10%) of the bid, made payable to the City of Baldwin Park. Said check or bond shall be given as a guarantee that the bidder will enter into a contract if awarded the work, and in case of refusal or failure to enter into said contract, the check or bond shall be forfeited to the City. c. Before submitting a bid, bidders shall carefully examine the Plans, Specifications, and Contract Documents, and shall visit the site of work so as to fully be informed of all existing conditions and limitations.

5. Signature of Contractor

a. Corporation - Any bids submitted by a corporation must include the name of the corporation, and must be signed by the President and Secretary or Assistant Secretary, and the corporate seal must be affixed. Other persons may sign for the corporation in lieu of the above if a certified copy of a resolution of the corporate board of directors so authorizing them to do so is on file in the City Clerk’s Office.

Page 152 of 325 ends

A-5 (1)
b. Partnerships - Any bids submitted by a partnership must contain the names of all persons comprising the partnership or co-partnership. All partners comprising the partnership unless proof in the form of a certified copy of a certificate of partnership acknowledging the signer to be a general partner is presented to the City Clerk must sign the bid. c. Joint Ventures - Any bids submitted by a joint venture must so state that and must be signed by each joint venturer.
d. Individuals - Any bids submitted by an individual must be signed by that individual unless an up-to-date power of attorney is on file in the City Clerk’s Office, in which case the person indicated in the power of attorney may sign for the individual.

The above rules also apply in the case of a fictitious firm name. In addition, however, where the fictitious name is used, it must be so indicated where the signature appears.

6. Examination of Plans, Contractor Documents and Project Site – The Plans, if any, and Contract Documents are on file and available for inspection in the office of the City Engineer. The Bidders are required to carefully examine the site, Plans, and Contract Documents. The Bidder shall be satisfied as to the character, quality, and quantities of work to be performed, materials to be furnished, and as to the requirements of the proposed contract.

Bidders are required to inspect the site of the work to satisfy themselves by personal examination or by such other means as they may prefer, of the location of the proposed work, and of the actual conditions, including subsurface, of and at the site of work. If, during the course of its examination, a bidder finds facts or conditions which appear to be in conflict with the letter or spirit of the bidding documents, the Bidder may apply to the City, in writing, for additional information and explanation before submitting its bid.

Submission of a bid by the bidder shall constitute conclusive evidence that, if awarded the Contract, it has relied and is relying on its own examination of (1) the site of the work, (2) access to the site, (3) all other data and matters requisite to the fulfillment of the work and on its own knowledge of existing facilities on and in the vicinity of the site of the work to be constructed under the Contract, (4) the conditions to be encountered, (5) the character, quality and scope of the proposed work, (6) the quality and quantity of the materials to be furnished, and (7) the requirements of the bid, the plans, the specifications, and the other Contract Documents.

Bidders shall not, at any time after submission of the bid, dispute, complain, or assert that there was any misunderstanding in regard to the nature or amount of work to be done. It is mutually agreed that the submission of a Contractor’s Bid Proposal shall be prima facie evidence that the Bidder has made such examination and is satisfied as to the conditions to be encountered in performing the work, and as to the requirements of the proposed Plans and Contract Documents.

7. Interpretation of Plans and Documents – If any person or contractor contemplating submitting a bid for the proposed work is in doubt as to the true meaning of any part of the

Page 153 of 325 ends

A-6 (1)
Plans, Specification, or Contract Documents, or other proposed documents, or finds discrepancies in, or omissions from the drawings or specifications, a written request may be submitted to the City Engineer for all interpretations or corrections thereof.

The person submitting the request will be responsible for its prompt delivery. Requests for interpretation must be received at least five (5) days prior to the bid opening date. Any interpretation or correction of the proposed documents will be made only by an Addendum, and a copy of such will be mailed or delivered to each person or contractor on the plan-holders list in receipt of a set of such documents.

The City of Baldwin Park will not be responsible for any other explanations or interpretations or any oral interpretation of the meaning of the Plans, Specification, or Contract Documents.

Telephone communications with City staff are not encouraged, but are permitted. However, any such oral communication shall not be binding on the City.

8. Intent of Contract Documents – The Contract Documents including any specifications, plans, and drawings thereof are intended to complement each other so that any work exhibited in either, whether in the other or not, is to be furnished according to the true intent and meaning, as if shown or required by all the documents including the specifications, plans, and drawings. In the event there is conflict between Contract Documents, the Specifications establish the precedence of documents.

9. Addenda – Any addenda issued during the time of bidding, or for preparation of bids, shall be made a part of the Contract Documents.

10. Modifications After Bid Opening – A modification which is received from an otherwise successful bidder and which makes the terms of the bid more favorable to the City will be considered at any time it is received and may thereafter be accepted. The City reserves the right to reject any and all modifications after bids have been opened.

11. Withdrawal of Bids – Bids may be withdrawn by written or telegraphic request received from bidders prior to the time set for opening of bids. After such time, a bidder may not withdraw its bid until after the expiration of sixty (60) days.

12. Return of Proposal Guaranties – Within ten (10) days after the award of the contract, the City of Baldwin Park will return the proposal guaranties, other than Bid Bonds, except any guaranties that have been forfeited.

13. Award of Contract – The award of the contract, if it is awarded, will be to the lowest responsive bidder complying with the Notice Inviting Bids, Instructions to Bidders, and the Information For Bidders.

For this project, the award of contract is scheduled to be acted upon by the City Council at the meeting scheduled for Wednesday, June 3, 2026. Work shall start on June 8, 2026.

Page 154 of 325 ends

A-7 (1)

The City reserves the right to reject any and all bids, to waive technical errors or discrepancies, to waive any informality or to waive non-substantial irregularities in the bids. In the case of combined bids, alternate bids, additive bids, or deductive bids, the Agency may specify the basis of determining the lowest responsive bidder in the Contractor’s Bid Proposal. The City, however, reserves the right to choose which alternate, additive, or deductive bid will be awarded based on the available funding the City has. The City also reserves the right to reject or delete one part of a proposal and accept the other, except to the extent that the bids are qualified by specific limitations.

Before award, the Bidder may be required to furnish evidence of adequate capability, equipment, and financial resources to perform the job. Bidders found not qualified may have their bids considered unresponsive and the proposals rejected. If the City Council finds that reasonable cause exists to believe collusion exists among Bidders, or that bid prices are unbalanced between bid items, any or all proposal may be rejected. Execution of Contract – The Contract Agreement is included in Section “C” of these Contract Documents. The Bidder should carefully examine these documents. The contract shall be signed by the successful Bidder, in duplicate, and returned, together with the contract bonds and insurance within ten (10) calendar days of receipt of these documents from the City. No contract shall be binding upon the City until it has been completely executed by the Contractor, approved by the City Attorney, and executed by the City.

Failure to execute a contract and file acceptable bonds and insurance as provided herein within the time limit above may be just cause for the annulment of contract award and the forfeiture of the proposal guarantee. The City will file the Contract Agreement, together with the required certificates and bonds, with the City Clerk after complete execution.

14. Bonds and Insurance – Bid Bonds must be accompanied by cash, cashier’s check, certified check, or surety bond in an amount equal to ten (10) percent of the total amount in the Contractor’s Proposal. Checks and bonds shall be made payable to the City of Baldwin Park.

The successful bidder, simultaneously with the execution of the Contract Agreement, will be required to furnish certificates evidencing that the required worker’s compensation and liability insurance is in effect, as well as the faithful performance bond and the labor and material payment bond. Said bonds shall be in the form and based upon conditions in Section 1-7.2 of the Specifications. A faithful performance bond in an amount equal to one hundred (100) percent of the contract price shall be furnished as security for completion of this contract, and a separate labor and material payment bond in an amount equal to one hundred (100) percent of the contract price shall be furnished as security for payment of all persons performing labor and furnishing materials in connection with this contract. The Bond Forms that are required are included in Section “C” of these Contract Documents. Copies will be furnished to prospective bidders upon request.

Page 155 of 325 ends

A-8 (1)
Prior to final acceptance of the improvements by the Agency, a warranty performance and payment bond in an amount equal to twenty five (25) percent of the contract price shall be obtained by the contractor and shall remain in effect until at least one year after the date of acceptance of the work by the Agency.

Whenever any Surety or Sureties on any such bonds, or any bonds required by Law for the protection of the claims of laborers and material men become insufficient or the City Engineer has cause to believe that such Surety or Sureties have become insufficient, a demand in writing may be made of the Contractor for each further bond or bonds or additional surety, not exceeding that originally required, as is considered necessary, considering the extent of the work remaining to be done. Thereafter, no payment shall be made upon such contract to the Contractor or any assignee of the Contractor until such further bond or bonds or additional surety has been furnished.

15. Equivalent Securities – Pursuant to California Public Contract Code Section 22300, substitution of eligible and equivalent securities for any moneys withheld to ensure performance under the contract for the work to be performed will be permitted at the request and expense of the successful bidder, unless otherwise prohibited by law. At the request and expense of the contractor, securities equivalent to the five percent (5%) withheld from progress payments pursuant to the City of Baldwin Park’s Standard General Conditions shall be deposited with the City Clerk or a state or federally charted bank as the escrow agent, who shall pay such monies to the contractor upon satisfactory completion of the contract.

Securities eligible for investment shall include those listed in Section 16430 of the Government Code or bank or savings and loan certificates of deposit. The contractor shall be the beneficial owner of any securities substituted for monies withheld and shall receive any interest thereof.

16. Bidders Interested in More than One Bid – No person, firm or corporation shall be allowed to make or file or be interested in more than one bid, as prime contractor, for the same work. A person, firm or corporation who has submitted a sub-proposal to a bidder, or who has quoted prices on material to a bidder, is not hereby disqualified from submitting a sub-proposal or quoting prices or other bidders.

17. Non-Collusion Affidavit – The City shall require all bidders to execute and submit a non- collusion affidavit with the Contractor’s Bid Proposal. The City reserves the right to accept the non-collusion affidavit before the award of the contract.

18. Substitutions – Where the specifications or drawings specify any material, product, thing, or service by the more brand names, whether or not “or equal” is added, and a bidder wishes to propose the use of another item as being equal, he shall request approval therefore as set forth in Section 4-6 of the Specifications.

19. Assignment of Contract – No assignment by the contractor of any contract to be entered into hereunder or of any part thereof, or of funds to be received there under by the contractor, will be recognized by the City unless such assignment has had the prior approval of the City and

Page 156 of 325 ends

A-9 (1)
the surety has been given due notice of such assignment in writing and has consented thereto in writing.

20. Other Requirements – The contractor will be required to obtain a City Business License prior to award of the contract.

21. Prevailing Wage – Bidders are required to inform themselves fully of the conditions relating to construction and labor under which the work will be performed. Any contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Pursuant to the provisions of Section 1773.2 of the Labor Code of the State of California, the minimum prevailing rate of per diem wages for each craft, classification or type of workman needed to execute the contract shall be those determined by the Director of Industrial Relations of the State of California, which are on file at the City Hall, City of Baldwin Park, 1414 Mission Street, Baldwin Park, California 91030, and are available to any interested party on request.

In entering into a public works contract, or a subcontract, to supply goods, services, or materials pursuant to a public works contract, the Contractor, or subcontractor, offers and agrees to assign to the awarding body all rights, title and interest in, and to, all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the Contractor, without further acknowledgment by the parties.

22. Bidder’s Registration Requirement – In accordance with Labor Code Section 1771.1, a Bid shall not be accepted and a contract for this Work shall not be entered into after without proof of the Bidder’s and all proposed subcontractors’ current registration with the Department of Industrial Relations to perform public work pursuant to Labor Code Section 1725.5.

23. Pre-Bid Inquiries – In the event the bidder has any questions as to the meaning of any part of the plans and specifications, or if the bidder finds any error, inconsistency, or ambiguity in the Contract Documents, the bidder shall make a written request for clarification prior to submitting its bid. All questions and comments regarding the plans and specifications should be directed via email to the Project Manager indicated below. Questions must be submitted by Wednesday, May 20, 2026 . Questions received after this time and date may not be addressed.

City of Baldwin Park – Public Works Department
14403 East Pacific Avenue, Baldwin Park, CA 91790
Daniel Padilla, Director of Public Works
(626)960-4011, ext. 460
[email protected]

Page 157 of 325 ends

B-1
Section B BID DOCUMENTS

CONTRACTOR’S BID PROPOSAL

City Project No. CIP 20-129 Phase C Sod Replacement & Soil Preparation – Barnes Park Multi-Benefit Stormwater Capture Project

Date: _____________________________
City of Baldwin Park
14403 East Pacific Avenue
Baldwin Park, CA 91706

TO: Honorable Mayor and
Members of the City Council

FROM: Bidder’s Company Name: __________________________________________ Contact Person: __________________________________________ Business Street Address: __________________________________________ City, State, and Zip Code: __________________________________________ Phone No.: __________________________________________ Fax No.: __________________________________________
Contractor License No.: __________________________________________

ATTN: City Clerk

Dear Madam:

We have carefully examined the sites, local conditions affecting the same, the Instructions to Bidders and Notice to Contractors, the agreement, the detailed plans and specifications and all bid and contract documents for the work set forth in the official publications, and submit herewith the following schedule of prices.

If awarded the contract, we agree construction work can start the week of June 8, 2026, and to complete proposed work within 17 working days as stated in the “Schedule of Performance” – Exhibit “A” in Section “D” of these specifications. We further agree to sign and return the contract to the City within ten (10) working days after receiving notice that the contract is ready for signature and to furnish bonds, insurance endorsements and certificates, and any other required documents in the form prescribed by the City at the same time.

Page 158 of 325 ends

B-2
We understand that in case of default in executing such contract with necessary bonds within the specified time, the cash, check or bond accompanying this bid and the money payable thereon shall be forfeited hereby to and remain the property of the City of Baldwin Park, except as provided in Public Contract Code Section 20174.

We have carefully checked all of the figures and understand that the City of Baldwin Park will not be responsible for any errors or omissions on the part of the undersigned in making up this bid.

Page 159 of 325 ends

B-3

BID SCHEDULE

City Project No. CIP 20-129 Phase C - Sod Replacement & Soil Preparation Barnes Park Multi-Benefit Stormwater Capture Project

Item
No. Item Description Qty. & Unit Unit Price (Words) Unit Price Amount 1 REMOVE & DISPOSE
OF SOD 69,500 SF $ $
2 SOIL PREPARATION
& FINE GRADING 69,500 SF $ $
3 SOD (TURF) 69,500 SF $ $
4 SOD

MAINTENANCE

PERIOD - NINETY
(90) Days
1 LS $ $
Total Base Bid: (Numbers) $
NOTE: Award of project will be based on BASE BID amount.

Total Base Bid: (Words)

The following additive bid items shall be included in the Bid. These items will be added individually by the City based on available funding. There is no guarantee that any, all, or some items will be added. The City reserves the right to add individual items as appropriate and within the Project budget. As indicated above, the award of the Project will be based on the BASE BID amount.

ADDITIVE BID

Page 160 of 325 ends

B-4
Item
No. Item Description Qty. & Unit Unit Price (Words) Unit Price Amount A
12-MONTH (365-

DAY) SOD

MAINTENANCE
PERIOD
1 LS $ $
Total Additive Bid: (Numbers) $

Total Additive Bid: (Words)

The undersigned bidder acknowledges receipt of the following addendum issued for the above project. If no addendum has been received, write “none”.

List of Addendum Received:

Signature of Bidder

Page 161 of 325 ends

B-5
The foregoing quantities are approximate only, being given as a basis for the comparison of bids, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable by the Engineer. All bids will be compared on the basis of the Engineer’s estimated quantities of work to be performed.

The bidder agrees that in case of not executing the required contract with necessary bonds within ten (10) days, not including Sundays, after having received notice that the contract is ready for signature, the proceeds of the check or bond accompanying his bid shall become the property of the City of Baldwin Park.

The bidder also certifies that the bid is a balanced bid. In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct.

Page 162 of 325 ends

B-6

DESIGNATION OF SUB-CONTRACTORS

City Project No. CIP 20-129 – Barnes Park Multi-Benefit Stormwater Capture Project

As required by State Law, the General Contractor bidding will hereinafter state the subcontractor on the job for each particular trade or subdivision of the work in excess of one-half percent of the total bid price and will state the first name and principal location of mill, ship, plant or office of each. Where no subcontractor is listed for a particular phase of the work, it is understood that the General Contractor will perform the work. No changes or substitutions may be made in these subcontractors except upon the prior approval of the City.

The undersigned certifies that the bids of the following listed subcontractors were used in producing the bid, and that the subcontractors listed will be used for the work for which they bid, subject to the approval of the City Engineer, and in accordance with the applicable provisions of the Specifications for the listed Work:

Name, address and phone number of
subcontractors, suppliers and vendors
Description of work, materials
and/or equipment
Dollar Value of
Sub-Contract
% of Total Bid
Amount

Bidder’s Name Authorized Signature Date

Page 163 of 325 ends

B-7

BID BOND
(not necessary when cash, certified or cashier’s check accompanies Bid)

KNOW ALL MEN BY THESE PRESENT,
That we, _________________________________, the undersigned Bidder, as Principal and ________________________________________________________, as Surety, our respective heirs, executors, administrators, successors and assigns, are jointly and severally and firmly bound, unto THE CITY OF BALDWIN PARK , hereinafter “Obligee,” for payment of the penal sum hereof in lawful money of the United States, as more particularly set forth herein.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT:

WHEREAS, the Principal has submitted the accompanying Bid for City Project No. CIP 20-129 Phase C Sod Replacement & Soil Preparation - Barnes Park Multi-Benefit Stormwater Capture Project, Project and the Bid must be accompanied by Bid security.

WHEREAS, subject to the terms of this Bond, the Surety is firmly bound unto the Obligee in the penal sum of $________________________________________________ (Ten Percent (10%) ) of the total amount of the Bid on the base contract work submitted by the Principal to the Obligee, as set forth above.

NOW THEREFORE, if the Principal shall not withdraw said Bid within the period specified in the Bidding Documents, or, if no period be specified, for sixty (60) calendar days after award of the Contract for the Project; or if the Principal does not attempt to withdraw the Bid when the requirements of Public Contact Code §5101 et seq. are not met; or if the Principal is awarded the Contract, and shall within the period specified therefore, or if no period be specified, within fourteen (14) calendar days after award of the Contract, enter into a written contract with the Obligee, in accordance with the Bid as accepted, and give such bond(s) with good and sufficient surety or sureties, as may be required, for the faithful performance and proper fulfillment of such Contract and for the payment for labor and materials used for the performance of the Contract and the required insurance documentation, then the above obligation shall be void and of no effect, otherwise to remain in full force and effect.

In the event that suit or other proceeding is brought upon this Bond by the Obligee, the Surety shall pay to the Obligee all costs, expenses and fees incurred by the Obligee in connection therewith, including without limitation, attorneys’ fees and costs.

Page 164 of 325 ends

B-8
IN WITNESS WHEREOF, the parties hereto have set their names, titles, hands, and seal this ________ day of ____________________________, 2026 by their duly authorized agents or representatives

_____________________________________________
Principal

By:__________________________________________

_____________________________________________
Title
_____________________________________________
Address

_____________________________________________
Surety

BY:__________________________________________

_____________________________________________
Title
_____________________________________________
Address

STATE OF CALIFORNIA )
) §

COUNTY OF LOS ANGELES )

________________________________ and ____________________________________ being duly sworn says for himself and not one for the other that he is the Principal or the Surety named in the foregoing bond and that he executed the same and is worth not less than double the monetary sum mentioned therein over and above all statutory exemptions.

Subscribed and sworn to before me this ______ day of _________________, 2026.

____________________________________
Notary Public

Page 165 of 325 ends

B-9

OWNERSHIP AFFIDAVIT

STATE OF CALIFORNIA )
COUNTY OF LOS ANGELES ) §:

CITY OF BALDWIN PARK )

, being duly sworn, deposes and says:

 INDIVIDUAL That he/she is the party making the foregoing proposal:
 PARTNERSHIP That he/she is a member of the co-partnership firm designated as:

and who has been and is duly vested with the authority to make and execute instruments for the co-partnership by:

who constitute the other members of the co-partnership.  CORPORATION That he is of:

a corporation which is making the foregoing proposal:
 JOINT VENTURE That he is of:

one of the parties making the foregoing proposal as a joint venture, and the he/she has been and is duly vested with the authority to execute instruments for an on behalf of the parties making said bid who are:

that such a bid is genuine and not collusive or sham, that the bidder has not colluded, conspired, connived, or agreed, directly or indirectly with any other bidder or person to put in a sham bid or to refrain from bidding; and has not in any manner sought by collusion to secure any advantage against the City of Baldwin Park or any person interested in the proposed contract, for himself or any other person.

Signature of Bidder

Subscribed and sworn to before me this day of , 2026

Signature of officer Administering Oath (Notary Public)

Page 166 of 325 ends

B-10

NON-COLLUSION AFFIDAVIT

City Project No. CIP 20-129 Phase C Sod Replacement and Soil Preparation – Barnes Park Multi- Benefit Stormwater Capture Project
To Be Executed By Each Bidder Of A Principal Contract

STATE OF CALIFORNIA )
) §:

COUNTY OF LOS ANGELES )

being first duly sworn deposes and
says that he is the (sole owner, a
partner, president, etc.) of the party making the foregoing bid; that such bid is not made in the interest of or behalf of any undisclosed person, partnership, company, association, organization or corporation, that such bid is genuine and not collusive or sham, that said bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, or that anyone shall refrain from bidding, that said bidder has not in any manner, directly or indirectly sought by agreements, communication or conference with anyone to fix the bid price of said bidder or of any other bidder, or to fix the overhead, profit, or cost element of such bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract or anyone interested in the proposed contract; that all statements contained in such bid are true, and further, that said bidder has not, directly or indirectly, submitted his bid price, or any breakdown thereof, or the contents thereof, or divulged information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company, association, organization, bid depository, or to any member or agency thereof, or to any other individual information or date relative thereto, or paid and will not pay any fee in connection, therewith to any corporation, partnership, company association, organization, bid depository, or to any member or agency thereof, or to any other individual, except to such person or persons as have a partnership or other financial interest with said bidder in his general business.

Signed:

Title:

Subscribed and sworn to and before me this day of , 2026.

Seal of Notary

Page 167 of 325 ends

B-11

TECHNICAL ABILITY AND EXPERIENCE

The bidder is required to state what work of a similar character to that included in the proposed contract he has successfully performed and give references which will enable the City Council to judge of his responsibility, experience, skill and business and financial standing. A minimum of three references must be included . Additional numbered pages outlining this portion of the proposal may be attached to this page.

REFERENCES:

1. Name of City or Business
Contact Person & Phone No.

Type of Work
Date Completed Total Contract Amount $

2. Name of City or Business
Contact Person & Phone No.

Type of Work
Date Completed Total Contract Amount $

3. Name of City or Business
Contact Person & Phone No.

Type of Work
Date Completed Total Contract Amount $

4. Name of City or Business
Contact Person & Phone No.

Type of Work
Date Completed Total Contract Amount $

Page 168 of 325 ends

B-12

CERTIFICATION OF PRINCIPAL

I am aware of the provisions of Section 3700 of the Labor Code, which require every employer to be insured against liability for Workers' Compensation or to undertake self- insurance in accordance with the provisions of that Code, and I will comply with such provisions before commencing the performance of the work of this Contract. (Section 1861, Labor Code.)

Dated: _________________________ _____________________________________ Signature of Principal

Print Name

NOTE: THIS CERTIFICATE MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.

Page 169 of 325 ends

B-13

EQUAL EMPLOYMENT OPPORTUNITY CERTIFICATION

The bidder , proposed subcontractor , hereby certifies that he has , has not , participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that he has , has not , filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee of Equal Employment Opportunity, all reports due under the applicable filing requirements.

Company

By:

Title
Date:

Note:

The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFP 60-1.7(b) (1), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.)

Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations.

Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Federal Highway Administration or by the Director, Office of Federal Contract Compliance, U.S.

Department of Labor.

NOTE: THIS CERTIFICATE MUST BE COMPLETED AND RETURNED BY THE BIDDER EITHER WITH THE BID PROPOSAL AT THE TIME OF THE BID OPENING OR BY THE SUCESSFUL BIDDER, WITHIN 4 WORKING DAYS FOLLOWING THE BID OPENING.

Page 170 of 325 ends

B-14
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE

In accordance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire:

Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a Federal, State, or local government project because of a violation of law or a safety regulation?

Yes No

If the answer is yes, explain circumstances in the space below.

I declare under penalty of perjury that the foregoing information is true and correct.

Dated: _______________________, 2019.
________________________________
Bidder’s Signature

NOTE: THIS QUESTIONAIRE MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.

Page 171 of 325 ends

B-15
PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT

In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder has _____, has not ____ been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1.

Note: The bidder must place a check mark after "has" or "has not" in one of the blank spaces provided. The above Statement is part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

I declare under penalty of perjury that the foregoing information is true and correct.

Dated: _______________________, 2026.

________________________________
Bidder’s Signature

NOTE: THIS CERTIFICATE MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.

Page 172 of 325 ends

B-16
PUBLIC CONTRACT CODE SECTION 10232 STATEMENT

In accordance with Public Contract Code Section 10232, the Contractor, hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a Federal court has been issued against the Contractor within the immediately preceding two year period because of the Contractor's failure to comply with an order of a Federal court which orders the Contractor to comply with an order of the National Labor Relations Board.

Note: The above Statement and Questionnaire are part of the Proposal. Signing this Proposal on the signature portion thereof shall also constitute signature of this Statement and Questionnaire.

Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution.

I declare under penalty of perjury that the foregoing information is true and correct.

Dated: _______________________, 2026.
________________________________
Bidder’s Signature

NOTE: THIS STATEMENT MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.

Page 173 of 325 ends

B-17
CONTRACTOR REGISTRATION LAW - Senate Bill 854 requirements Pursuant to Labor Code section 1725.5, this project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

No contractor or subcontractor may be listed on a bid proposal for a public works project and no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations (DIR).

Each bidder is responsible to list their registered information with the DIR in the space below provided and sign below.

Contractor Name or
subcontractor name
DIR Registration
Number
License
Type/Number
Registration
Date
Expiration
Date

Bidder’s Signature______________________________________________________ Bidders Name__________________________________________________________ NOTE: THIS FORM MUST BE COMPLETED AND RETURNED ALONG WITH THE CONTRACTOR’S BID PROPOSAL.

Page 174 of 325 ends

B-18

BIDDERS GUARANTEE
Enclosed is Cash ( ), Cashier's Check ( ), Certified Check ( ), or Bid Bond ( ), in the sum of $________________________ which is at least 10% of the amount bid.

Contractor: ________________________________________________ Address: ________________________________________________ ________________________________________________
Fax Number: ________________________________________________ Telephone Number: __________________________________________ By: ________________________________________________
Signature of Contractor

________________________________________________
Print Name

________________________________________________
Title
State of California Contractor's License:

Classification: _________ License No.___________________ Expiration: ____

Page 175 of 325 ends

C-1
Section C CONTRACT DOCUMENTS

CONTRACT SERVICE AGREEMENT FOR
City Project No. CIP 20-129 Phase C Sod Replacement and Soil Preparation, Barnes Park Multi-Benefit Stormwater Capture Project

THIS CONTRACT SERVICES AGREEMENT (herein "Agreement"), is made and entered into this ______ day of June, 2026 by and between the CITY OF BALDWIN PARK, a municipal corporation, (herein "City") and __________________________ (herein "Contractor"). The parties hereto agree as follows:

R E C I T A L S
A. City requires all landscape improvements be constructed in accordance with the project specifications and in accordance with industry standards. Contractor has represented to City that Contractor is qualified to perform said services and has submitted a proposal to City for same.

B. City desires to have Contractor perform said services on the terms and conditions set forth herein.

NOW, THEREFORE, based on the foregoing Recitals and for good and valuable consideration, the receipt and sufficiency of which is acknowledged by both parties, City and Contractor hereby agree as follows:

1. SERVICES OF CONTRACTOR

1.1 Scope of Services – In compliance with all terms and conditions of this Agreement, the Contractor shall provide those services specified in the Special and Technical Provisions, which services may be referred to herein as the "services" or "work" hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that Contractor is a provider of first class work and services and Contractor is experienced in performing the work and services contemplated herein and, in light of such status and experience, Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be of good quality, fit for the purpose intended.

Page 176 of 325 ends

C-2

1.2 Documents Included in Contract – This contract consists of the Notice Inviting Bids and Instructions to Bidders, Bid Documents, Proposal Schedule, Bid Bond (Bidder’s Guarantee), Designation of Sub-contractors, Statement of Non-collusion by Contractor, Certification of Principal, Supplemental Information, Specifications, Plans, this Contract Services Agreement, Faithful Performance Bond, Labor and Materials Bond, Warranty Bond, Guarantee, Tax Identification Form, Workers’ Compensation Certification, and any and all schedules and attachments to it which are incorporated as if fully set forth herein. In the event of an inconsistency, this Agreement shall govern.

1.3 Compliance with Law – All services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental agency having jurisdiction in effect at the time service is rendered.

1.4 Licenses, Permits, Fees, and Assessments – Contractor shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor's performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City against any such fees, assessments, taxes penalties or interest levied, assessed or imposed against City hereunder.

Contractor shall be responsible for all sub-contractors' compliance with this Section.

1.5 Familiarity with Work – By executing this Contract, Contractor warrants that Contractor (a) has thoroughly investigated and considered the scope of services to be performed, (b) has carefully considered how the services should be performed, and (c) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement.

If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Contractor discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Contractor shall immediately inform the City of such fact and shall not proceed except at Contractor's risk until written instructions are received from the Contract Officer.

1.6 Care of Work – The Contractor shall adopt reasonable methods during the life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by City's own negligence.

1.7 Further Responsibilities of Parties – Both parties agree to use reasonable care and diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of this Agreement. Unless hereafter specified,

Page 177 of 325 ends

C-3
neither party shall be responsible for the service of the other. Contractor shall require all sub- contractors to comply with the provisions of this agreement.

1.8 Additional Services – City shall have the right at any time during the performance of the services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a written change order is first given by the Contract Officer to the Contractor, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of the Contractor. Any increase in compensation of twenty-five percent (25%) or less of the Contract Sum, or in the time to perform of one hundred eighty (180) days or less may be approved by the Contract Officer. Any greater increases, taken either separately or cumulatively must be approved by the City Council. It is expressly understood by Contractor that the provisions of this Section shall not apply to services specifically set forth in the Scope of Services or reasonably contemplated therein. Contractor hereby acknowledges that it accepts the risk that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than Contractor anticipates and that Contractor shall not be entitled to additional compensation therefore.

1.9 Special Requirements – Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in the "Special Requirements" attached hereto as Exhibit “A through D” and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit “A through D” and any other provisions of this Agreement, the provisions of Exhibit “A through D” shall govern.

1.10 Prevailing Wages Laws – In accordance with Labor Code Section 1770 et seq., the director of the Department of Industrial Relations of the State of California has ascertained a general prevailing rate of wages, which is the minimum amount, which shall be paid to all workers employed to perform the work pursuant to this Agreement. A copy of the general prevailing wage rate determination is on file in the office of the City Clerk and is hereby incorporated in this Agreement. In accordance with the provisions of Labor Code Section 1810 et seq., eight (8) hours is the legal working day. Contractor must forfeit to the City Twenty Five Dollars ($25.00) a day for each worker who works in excess of the minimum working hours when Contractor does not pay overtime. Contractor is required to post a copy of such wage rates at all times at the contract site. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contractor also shall comply with State law requirements to maintain payroll records and shall provide for certified records and inspection of records as required by California Labor Code Section 1770 et seq., including Section 1776. Contractor shall comply with all statutory requirements relating to the employment of apprentices.

Page 178 of 325 ends

C-4

2. COMPENSATION

2.1 Contract Sum – For the services rendered pursuant to this Agreement, the Contractor shall be compensated as specified herein, but not exceeding the maximum contract amount of ($____________________) (herein
"Contract Sum"), except as provided in Section 1.8. The Contract Sum shall include the attendance of Contractor at all project meetings reasonably deemed necessary by the City; Contractor shall not be entitled to any additional compensation for attending said meetings.

2.2 Progress Payments - Prior to the first day of the month, during the progress of the work, commencing on the day and month specified in the Agreement, Contractor shall submit to the Contract Officer a complete itemized statement of all labor and materials incorporated into the work during the preceding month and the portion of the contract sum applicable thereto. Upon approval in writing by the Contract Officer, payment shall be made in thirty (30) days. City shall pay Contractor a sum based upon ninety five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the month covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security. Refer to Section 7.3 of this Agreement for retention of funds.

3. PERFORMANCE SCHEDULE

3.1 Time of Essence – Time is of the essence in the performance of this Agreement. Contractor shall complete work within 17 Working Days, and shall begin work on June 8, 2026 or as soon as feasible after contract execution.

3.2 Schedule of Performance – Contractor shall commence the services pursuant to this Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s) established in the "Schedule of Performance" attached hereto as Exhibit "A", if any, and incorporated herein by this reference. When requested by the Contractor, the Contract Officer may approve extensions to the time period(s) specified in the Schedule of Performance in writing.

3.3 Force Majeure – The time period(s) specified in the Schedule of Performance for performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10) days of the commencement of such delay notify the Contract Officer in writing of the causes for the delay. The Contract Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified. The Contract Officer's determination shall be final and conclusive upon the parties to this Agreement.

Page 179 of 325 ends

C-5

3.4 Term – Unless earlier terminated in accordance with Section 7.8 of this Agreement, this Agreement shall continue in full force and effect until final approval and acceptance of the project by the Contract Officer.

4. COORDINATION OF WORK

4.1 Representative of Contractor – The following principals of Contractor are hereby designated as being the principals and representatives of Contractor authorized to act in its behalf with respect to the work specified herein and make all decisions in connection therewith:

___________________________________
___________________________________
___________________________________

It is expressly understood that the experience, knowledge, capability and reputation of the foregoing principals were a substantial inducement for City to enter into this Agreement.

Therefore, the foregoing principals shall be responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to personally supervise the services hereunder. For purposes of this Agreement, the foregoing principals may not be replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of City.

4.2 Contract Officer – The Contract Officer shall be such person as may be designated by the City Manager or City Engineer. It shall be the Contractor's responsibility to assure that the Contract Officer is kept informed of the progress of the performance of the services and the Contractor shall refer any decisions, which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.

4.3 Prohibition Against Assignment – The experience, knowledge, capability and reputation of Contractor, its principals and employees were a substantial inducement for the City to enter into this Agreement. Neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without the express consent of City.

Page 180 of 325 ends

C-6

4.4 Independent Contractor – Neither the City nor any of its employees shall have any control over the manner, mode or means by which Contractor, its sub-contractors, agents or employees, performs the services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of Contractor's employees, sub- contractors, servants, representatives or agents, or in fixing their number, compensation or hours of service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contractor shall not at any time or in any manner represent that it or any of its sub-contractors, agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contractor in its business or otherwise or a joint venture or a member of any joint enterprise with Contractor.

4.5 Identity of Persons Performing Work – Contractor represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all tasks and services set forth herein. Contractor represents that the tasks and services required herein will be performed by Contractor or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services.

4.6 Utility Relocation – City is responsible for removal, relocation, or protection of existing main or trunk line utilities to the extent such utilities were not identified in the invitation for bids or specifications. City shall reimburse contractor for any costs incurred in locating, repairing damage not caused by contractor and removing or relocating such unidentified utility facilities, including equipment idled during such work. Contractor shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities.

4.7 Trenches or Excavations – Pursuant to California Public Contract Code Section 7104, in the event the work included in this Agreement requires excavations more than four (4) feet in depth, the following shall apply.
a) Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law; (2) Subsurface or latent physical conditions at the site different from those indicated; or (3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract.

b) City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of the work shall issue a change order per Section 1.8 of this Agreement.

Page 181 of 325 ends

C-7
c) That, in the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contractor’s cost of, or time required for, performance of any part of the work, Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract.

Contractor shall retain any and all rights provided either by contract or by law, which pertain to the resolution of disputes and protests between the contracting parties.

5. INSURANCE, INDEMNIFICATION AND BONDS

5.1 Insurance – The Contractor shall procure and maintain, at its sole cost and expense, in a form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the following policies of insurance:

Coverage (Check if applicable)

Minimum Limits

(X)
Comprehensive General Liability Insurance
(including premises and operations)
$2,000,000 per occurrence combined single limit

( )
Contractual Liability Insurance Products
Liability Insurance
$1,000,000 limit

(X)
Comprehensive Automobile Liability
Insurance (includes owned, non-owned,
and hired automobile hazard
$2,000,000 per occurrence combined single limit

( )
Professional Liability Insurance (providing
for a one year discovery period)
$1,000,000 limit

(X)
Workers' Compensation/Employers'
Liability Insurance
Statutory $2,000,000 per occurrence

CONDITIONS:

In accordance with Public Code Section 20170, the insurance of surety companies who provide or issue the policy shall have been admitted to do business in the State of California with a credit rating of “A” minus or better. This insurance shall not be canceled, limited in scope or coverage or non-renewed until after thirty (30) days prior written notice has been given to the City Engineer, City of Baldwin Park, 14403 East Pacific Avenue, Baldwin Park, California 91706.

Any insurance maintained by the City of Baldwin Park shall apply in excess of and not combined with insurance provided by this policy.

The City of Baldwin Park, its officers, employees, representatives, attorneys, and volunteers shall be named as additional named insureds.

Page 182 of 325 ends

C-8
Prior to commencement of any work under this contract, Contractor shall deliver to the City insurance endorsements confirming the existence of the insurance required by this contract, and including the applicable clauses referenced above. Such endorsements shall be signed by an authorized representative of the insurance company and shall include the signatory’s company affiliation and title. Should it be deemed necessary by the City, it shall be Contractor's responsibility to see that the City receives documentation, acceptable to the City, which sustains that the individual signing said endorsements, is indeed authorized to do so by the insurance company.

If the Contractor fails to maintain the aforementioned insurance, or secure and maintain the aforementioned endorsement, the City may obtain such insurance, and deduct and retain the amount of the premiums for such insurance from any sums due under the agreement. However, procuring of said insurance by the City is an alternative to other remedies the City may have, and is not the exclusive remedy for failure of Contractor to maintain said insurance or secure said endorsement. In addition to any other remedies the City may have upon Contractor's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Contractor to stop work hereunder, and/or withhold any payment(s) which became due to Contractor hereunder until Contractor demonstrates compliance with the requirements hereof.

Nothing herein contained shall be construed as limiting in any way the extent to which Contractor may be held responsible for payments of damages to persons or property resulting from Contractor's or its sub-contractor's performance of the work covered under this agreement.

Each contract between the Contractor and any sub-contractor shall require the sub- contractor to maintain the same policies of insurance that the Contractor is required to maintain pursuant to this Section 5.1.

5.2 Indemnification – Contractor shall indemnify the City, its officers, agents and employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities, (herein "claims or liabilities") that may be asserted or claimed by any person, firm or entity arising or alleged to arise out of or in connection with the negligent performance of the work, operations or activities of Contractor, its agents, employees, sub-contractors, or invitees, provided for herein, or arising or alleged to arise from the negligent acts or omissions of Contractor hereunder, or arising or alleged to arise from Contractor's negligent performance of or failure to perform any term, provision, covenant or condition of this Agreement, but excluding such claims or liabilities or portion of such claims or liabilities arising or alleged to arise from the negligence or willful misconduct of the City, its officers, agents or employees, and in connection therewith:
a) Contractor will defend any action or actions filed in connection with any of said claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection therewith;

Page 183 of 325 ends

C-9
b) Contractor will promptly pay any judgment rendered against the City, its officers, agents or employees for any such claims or liabilities arising or alleged to arise out of or in connection with Contractor’s (or its agents’, employees’, sub-contractors’, or invitees’) negligent performance of or failure to perform such work, operations or activities hereunder; and Contractor agrees to save and hold the City, its officers, agents, and employees harmless therefrom;

c) In the event the City, its officers, agents or employees is made a party to any action or proceeding filed or prosecuted against Contractor for such damages or other claims arising or alleged to arise out of or in connection with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder, Contractor shall pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and attorneys' fees for counsel acceptable to City.

d) Contractor's duty to defend and indemnify as set out in this Section 5.2 shall include any claims, liabilities, obligations, losses, demands, actions, penalties, suits, costs, expenses or damages or injury to persons or property arising or alleged to arise from, in connection with, as a consequence of or pursuant to any state or federal law or regulation regarding hazardous substances, including but not limited to the Federal Insecticide, Fungicide and Rodenticide Act ("FIFRA"), Comprehensive Environmental Response, Compensation and Liability Act of 1980 ("CERCLA"), Resource Conservation and Recovery Act of 1976 ("RCRA"), the Hazardous and Solid Waste Amendments of 1984, the Hazardous Material Transportation Act, the Toxic Substances control Act, the Clean Air Act, the Clean Water Act, the California Hazardous Substance Account Act, the California Hazardous Waste Control Law or the Porter-Cologne Water Quality Control Act, as any of those statutes may be amended from time to time.

The Contractor's indemnification obligations pursuant to this Section 5.2 shall survive the termination of this Agreement. Contractor shall require the same indemnification from all sub- contractors.

5.3 Labor and Materials, Performance and Warranty Bonds – Concurrently with execution of this Agreement, Contractor shall deliver to City a labor and materials bond, a performance bond and a warranty bond, in the forms provided by the City Clerk, which secures the faithful performance of this Agreement. The bonds shall contain the original notarized signature of an authorized officer of the surety and affixed thereto shall be a certified and current copy of his power of attorney. The bonds shall be unconditional and remain in force during the entire term of the Agreement and shall be null and void only if the Contractor promptly and faithfully performs all terms and conditions of this Agreement.

Page 184 of 325 ends

C-10

5.4 Sufficiency of Insurer or Surety – Insurance or bonds required by this Agreement shall be satisfactory only if issued by companies qualified to do business in California, rated "A" or better in the most recent edition of Best Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial category Class VII or better, unless such requirements are waived by the Risk Manager of the City due to unique circumstances. In the event the Risk Manager of City ("Risk Manager") determines that the work or services to be performed under this Agreement creates an increased risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the performance bond required by this Section 5 may be changed accordingly upon receipt of written notice from the Risk Manager; provided that the Contractor shall have the right to appeal a determination of increased coverage by the Risk Manager to the City Council of City within ten (10) days of receipt of notice from the Risk Manager.

5.5 Substitution of Securities – Pursuant to California Public Contract Code Section 22300, substitution of eligible equivalent securities for any moneys withheld to ensure performance under the contract for the work to be performed will be permitted at the request and expense of the successful bidder.

6. RECORDS AND REPORTS

6.1 Reports – Contractor shall periodically prepare and submit to the Contract Officer such reports concerning the performance of the services required by this Agreement as the Contract Officer shall require. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services contemplated herein or, if Contractor is providing design services, the cost of the project being designed, Contractor shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or decreased cost related thereto and, if Contractor is providing design services, the estimated increased or decreased cost estimate for the project being designed.

6.2 Records – Contractor shall keep, and require sub-contractors to keep, such books and records (including but not limited to payroll records as required herein) as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate the performance of such services. The Contract Officer shall have full and free access to such books and records at all times during normal business hours of City, including the right to inspect, copy, audit and make records and transcripts from such records. Such records shall be maintained for a period of three (3) years following completion of the services hereunder, and the City shall have access to such records in the event any audit is required.

6.3 Ownership of Documents – All drawings, specifications, reports, records, documents and other materials prepared by Contractor, its employees, sub-contractors and agents in the performance of this Agreement shall be the property of City and shall be delivered to City upon

Page 185 of 325 ends

C-11
request of the Contract Officer or upon the termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Contractor may retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts embodied therein. All sub-contractors shall provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all damages resulting therefrom.

7. ENFORCEMENT OF AGREEMENT

7.1 California Law – This Agreement shall be construed and interpreted both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Los Angeles, State of California, or any other appropriate court in such county, and Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action.

7.2 Disputes – In the event either party fails to perform its obligations hereunder, the non- defaulting party shall provide the defaulting party written notice of such default. The defaulting party shall have ten (10) days to cure the default; provided that, if the default is not reasonably susceptible to being cured within said ten (10) day period, the defaulting party shall have a reasonable time to cure the default, not to exceed a maximum of thirty (30) days, so long as the defaulting party commences to cure such default within ten (10) days of service of such notice and diligently prosecutes the cure to completion; provided further that if the default is an immediate danger to the health, safety and general welfare, the defaulting party shall take such immediate action as may be necessary. Notwithstanding the foregoing, the non-defaulting party may, in its sole and absolute discretion, grant a longer cure period. Should the defaulting party fail to cure the default within the time period provided in this Section, the non-defaulting party shall have the right, in addition to any other rights the non-defaulting party may have at law or in equity, to terminate this Agreement. Compliance with the provisions of this Section 7.2 shall be a condition precedent to bringing any legal action, and such compliance shall not be a waiver of any party's right to take legal action in the event that the dispute is not cured.

7.3 Retention of Funds – Progress payments shall be made in accordance with the provisions of Section 2.2 of this agreement. In accordance with said section, City shall pay Contractor a sum based upon ninety five percent (95%) of the contract price apportionment of the labor and materials incorporated into the work under the contract during the month covered by said statement. The remaining five percent (5%) thereof shall be retained as performance security to be paid to the Contractor within sixty (60) days after final acceptance of the work by the City Council, after Contractor shall have furnished City with a release of all undisputed contract amounts if required by City. In the event there are any claims specifically excluded by Contractor from the operation of the release, the City may retain proceeds (per Public Contract Code 7107) of up to 150% of the amount in dispute. City’s failure to deduct or withhold shall not affect Contractor’s obligations hereunder.

Page 186 of 325 ends

C-12

7.4 Waiver – No delay or omission in the exercise of any right or remedy by a nondefaulting party on any default shall impair such right or remedy or be construed as a waiver. A party's consent to or approval of any act by the other party requiring the party's consent or approval shall not be deemed to waive or render unnecessary the other party's consent to or approval of any subsequent act. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement.

7.5 Rights and Remedies are Cumulative – Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party.

7.6 Legal Action – In addition to any other rights or remedies, either party may take legal action, law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement.

7.7 Liquidated Damages – Since the determination of actual damages for any delay in performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City liquidated damages for each working day of delay in the performance of any service required hereunder, as specified in subsection 6-9 of the Standard Specifications and the provisions of the Contract Specifications. In addition, liquidated damages may be assessed for failure to comply with the emergency call out requirements described in the scope of services.

The City may withhold from any moneys payable on account of services performed by the Contractor any accrued liquidated damages.

7.8 Termination for Default of Contractor – If termination is due to the failure of the Contractor to fulfill its obligations under this Agreement, Contractor shall vacate any City owned property which Contractor is permitted to occupy hereunder and City may, after compliance with the provisions of Section 7.2, take over the work and prosecute the same to completion by contract or otherwise, and the Contractor shall be liable to the extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to the Contractor for the purpose of setoff or partial payment of the amounts owed the City as previously stated.

7.9 Attorneys' Fees – If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery and

Page 187 of 325 ends

C-13
all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment.

8. CITY OFFICERS AND EMPLOYEES, NONDISCRIMINATION

8.1 Non-liability of City Officers and Employees – No officer or employee of the City shall be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms of this Agreement.

8.2 Conflict of Interest – The Contractor warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement.

8.3 Covenant Against Discrimination – Contractor covenants that, by and for itself, its heirs, executors, assigns, and all persons claiming under or through them, that there shall be no discrimination against or segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status, national origin, or ancestry in the performance of this Agreement. To the extent required by law, contractor shall take affirmative action to insure that applicants are employed and that employees are treated during employment without regard to their race, color, creed, religion, sex, marital status, national origin, or ancestry.

9. MISCELLANEOUS PROVISIONS

9.1 Notice - Any notice, demand, request, document, consent, approval, or communication either party desires or is required to give to the other party or any other person shall be in writing and shall be deemed to be given when served personally or deposited in the US Mail, prepaid, first-class mail, return receipt requested, addressed as follows:

To City: City of Baldwin Park
14403 East Pacific Avenue
Baldwin Park, California 91706
Attention: Public Works Department

To Contractor: ____________________________
____________________________
____________________________
____________________________

9.2 Interpretation – The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply.

Page 188 of 325 ends

C-14

9.3 Integration; Amendment – It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in writing.

9.4 Severability – In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.

9.5 Hiring of Illegal Aliens Prohibited – Contractor shall not hire or employ any person to perform work within the City of Baldwin Park or allow any person to perform work required under this Agreement unless such person is properly documented and legally entitled to be employed within the United States.

9.6 Unfair Business Practices Claims – In entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the contractor or sub-contractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C.

Section 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body renders final payment to the contractor without further acknowledgment by the parties. (Section 7103.5, California Public Contract Code.)

9.7 Corporate Authority – The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound.

9.8 Legal Responsibilities – The Contractor shall keep itself informed of City, State, and Federal laws, ordinances and regulations, which may in any manner affect the performance of its services pursuant to this Agreement. The Contractor shall at all times observe and comply with all such laws, ordinances and regulations. Neither the City, nor their officers, agents, or employees shall be liable at law or in equity as a result of the Contractor’s failure to comply with this section.

Page 189 of 325 ends

C-15

9.9 Termination for Convenience – The City may terminate this Agreement without cause for convenience of the City upon giving contractor 30 days prior written notice of termination of the Agreement. Upon receipt of the notice of termination the Contractor shall cease all further work pursuant to the Agreement. Upon such termination by the City the Contractor shall not be entitled to any other remedies, claims, actions, profits, or damages except as provided in this paragraph. Upon the receipt of such notice of termination Contractor shall be entitled to the following compensation:

1. The contract value of the work completed to and including the date of receipt of the notice of termination, less the amount of progress payments received by contractor.

2. Actual move-off costs including labor, rental fees, equipment transportation costs, the costs of maintaining on-site construction office for supervising the mover-off.

3. The cost of materials custom made for this Agreement which cannot be used by the Contractor in the normal course of his business, and which have not been paid for by City in progress payments.

4. All costs shall not include any markups as might otherwise be allowed by any plans or specifications, which were a part of the Agreement.

The provisions of this paragraph shall supersede any other provision of the Agreement or any provision of any plans, specification, addendums or other documents, which are or may become a part of this Agreement. City and Contractor agree that the provisions of this paragraph are a substantive part of the consideration for this Agreement

Page 190 of 325 ends

C-16
IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above.

CONTRACTOR:

By: By:
(Print Name) (Print Name)

Signature: Signature:

Title: Title:

Address: Address:

CITY OF BALDWIN PARK, a municipal corporation

By:

Daniel Damian, MAYOR

ATTEST: APPROVED AS TO FORM:

By: _______________________________________ __________________________________________ City Clerk City Attorney

Page 191 of 325 ends

C-17

FAITHFUL PERFORMANCE BOND

PUBLIC WORK (CALIFORNIA)

KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, the Principal and the Obligee have entered into a written contract, hereinafter called the Contract, a copy of which is or may be attached hereto, dated the ______ day of June, 2026 referred to and made a part hereof for: the sod replacement and soil preparation improvements and all appurtenant work in accordance with plans and specifications for City Project No. CIP 20-129 Phase C – Barnes Park which agreement requires the Principal to provide Obligee with this bond.

NOW THEREFORE, we, _______________________________________, as Principal, and ___________________________________________, a corporation organized under the laws of _________________________, and duly authorized to transact business in the State of California, as Surety, are held firmly bound unto the City of Baldwin Park, as Obligee, in the sum of _____________________________________________________________________________________ Dollars ($_______________________), lawful money of the United States of America, for the payment whereof well and truly to be made the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

The condition of the foregoing obligation is such that if the Principal, his or its heirs, executors, administrators, successors or assigns, and each of his or its sub-contractors shall well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of said contract, and during the life of any guaranty required under the contract, and shall also well and truly perform and fulfill all the undertakings, covenants, terms, conditions, and agreements of any and all duly authorized modifications of said contract that may hereafter be made, then this obligation shall be void; otherwise it shall be and remain in full force and effect.

As part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the obligee in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The Surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the agreement or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the agreement or to the work or to the specifications.

Page 1 of 2 ends

(Use of City Bond Form is required)

Page 1 of 2 ends

(Use of City Bond Form is required)

Page 192 of 325 ends

C-18

IN WITNESS THEREOF, we have hereunto set our hands and seals this ______ day of ____________________, 2026.

(Corporate Seal) ________________________________________________ Principal

By______________________________________________

Title

(Corporate Seal) ________________________________________________ Surety

By______________________________________________

Title

APPROVED AS TO FORM:

_______________________________________________
City Attorney

Page 2 of 2 ends

(Use of City Bond Form is required)

Page 193 of 325 ends

C-19

LABOR AND MATERIAL PAYMENT BOND

PUBLIC WORK (CALIFORNIA)

KNOW ALL MEN BY THESE PRESENTS:

WHEREAS, ________________________________________, as Principal, has entered into a contract dated ___________________, 2026, with the City of Baldwin Park (Obligee) referred to and made a part hereof to perform the following work, to wit: the sod replacement and soil preparation improvements and all appurtenant work in accordance with plans and specifications for City Project No. CIP 20-129 Phase C – Barnes Park , which requires Principal to file this bond to secure claims made under Civil Code Section 3082 et seq.

NOW THEREFORE, we, ____________________________________, as Principal, and ___________________________________________, a corporation organized under the laws of ______________________ and duly authorized to transact business in the State of California, as Surety, are held firmly bound unto the City of Baldwin Park, as Obligee, and all sub-contractors, laborers, material persons and other persons employed in the performance of the referenced agreement, in the sum of
______________________________________________________________________________ Dollars ($_______________________), lawful money of the United States of America, for the payment whereof well and truly to be made the Principal and Surety bind themselves, their heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.

If the above bounden PRINCIPAL, his or its heirs, executors, administrators, successors, assigns, or any of his or its sub-contractors, fails to pay for any materials, provisions, provender, or other supplies, or teams, implements or machinery, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor to persons named in Section 3181 or the Civil Code, thereon of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor deducted, withheld and paid over to the Employment Development Department from the wages of employees of the contractor and sub- contractors pursuant to Section 13020 of the Unemployment Insurance Code, that the SURETY on this bond will pay the same, in an amount not exceeding the sum specified in this bond, AND ALSO, in case suit is brought upon this bond, a reasonable attorney's fee, which shall be awarded by the court to the prevailing party in said suit, said attorney's fee to be taxed as costs in said suit and to be included in the judgment herein rendered.

As part of the obligation secured hereby, the SURETY shall not be exonerated or released from the obligation of the bond by any change, alteration, or modification in or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement or pertaining or relating to the furnishing of labor, materials, or equipment therefor, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme of work of improvement, nor by any rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in

Page 1 of 2 ends

(Use of City Bond Form is required)

Page 194 of 325 ends

C-20
the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement, or under the bond, nor, where the bond is given for the benefit of claimants, by any fraud practiced by any person other than the claimant seeking to recover on the bond.

This bond shall insure to the benefit of any and all persons, companies and corporations entitled to file claims under Civil Code Section 3082 so as to give them a right of action in a suit on this bond.

This bond is executed for the purpose of complying with the laws of the State of California designated as Title 15, Chapter 7, Works of Improvement, commencing with Section 3247 of the Civil Code of the State of California and all amendments thereto, and shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code of the State of California.

IN WITNESS THEREOF, we have hereunto set our hands and seals this ______ day of _____________________, 2026.

(Corporate Seal) ________________________________________________ Principal

By

Title

(Corporate Seal) ________________________________________________ Surety

By

Title

(California Civil Code Sections 3248, 3225)

APPROVED AS TO FORM:

____________________________________________
City Attorney

Page 2 of 2 ends

(Use of City Bond Form is required)

Page 195 of 325 ends

C-21

WARRANTY BOND

PUBLIC WORKS

WHEREAS, the City Council of the City of Baldwin Park, State of California, and ________________________________________________, (hereinafter designated as "Principal") have entered into a written contract (the "Contract") dated ________________________ whereby Principal agrees complete the sod replacement and soil preparation improvements and all appurtenant work in accordance with plans and specifications for City Project No. CIP 20-129 Phase C – Barnes Park which Contract is hereby referred to and made a part hereof; and

WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the guarantee and warranty of the work for a period of one (1) year following the completion and acceptance thereof against any defective work or labor done or defective materials furnished.

NOW, THEREFORE, we, the Principal and _________________________________________, a corporation organized under the laws of ____________________, and duly authorized to transact business in the State of California, as Surety, are held and firmly bound unto the City of Baldwin Park, (hereinafter called "City"), in the penal sum of
______________________________________Dollars, ($__________________) lawful money of the United States, which is 50% of the amount of the Contract, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.

The condition of this obligation is such that if the above bounded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said Contract and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless City, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney fees, incurred by City in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.

The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the work or to the specifications.

Page 1 of 2 ends

(Use of City Bond Form is required)

Page 196 of 325 ends

C-22

IN WITNESS THEREOF, we have hereunto set our hands and seals this ______ day of _____________________, 2026.

_________________________________________
Principal
By Date
Signature

Title
__________________________________________
Surety
__________________________________________
Address
__________________________________________
Phone Number
By Date
Signature

Title

APPROVED AS TO FORM:

City Attorney

STATE OF CALIFORNIA

COUNTY OF

On before me, , a Notary
Public, personally appeared , personally
known to me OR proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

WITNESS my hand and official seal.

NOTARY PUBLIC

Page 2 of 2 ends

(Use of City Bond Form is required)

Page 197 of 325 ends

C-23

Page 198 of 325 ends

C-24

SUPPLEMENTAL INFORMATION TO BE COMPLETED BY PRINCIPAL

If an individual, so state. If a firm or co-partnership, state the firm and give the names of all individual co-partners composing the partnership. If a Corporation, state legal name of corporation; state also the names of the president, secretary, treasurer and manager thereof.

______________________________________________________
______________________________________________________
______________________________________________________

Business Address:
______________________________________________________
______________________________________________________
______________________________________________________

Telephone Number: ____________________________________

Date: ____________________________________

Print Name: ___________________________________________ Principal

Signature: _____________________________________________

Page 1 of 1 ends

(Use of City Form is required)

Page 199 of 325 ends

C-25

TAX IDENTIFICATION NUMBER
The Tax Equity and Fiscal Responsibility Act of 1982 requires the payer (City of Baldwin Park) to report to the Internal Revenue Service taxable payments to payees.

You (as a payee) are required by law to provide us with your Taxpayer Identification Number (if an individual or partnership, your Social Security Number). If you do not provide us with your correct identification number, you may be subject to a penalty imposed by the Internal Revenue Service.

The payments subject to withholdings may include, but are not limited to, interest, dividends, or other payments to the City of Baldwin Park. Other payments may include rents, royalties, commissions and fees for service of nonemployees.

If you are exempt from income tax, we are still required, by law, to maintain a Tax Identification Number on file. PLEASE PROVIDE YOUR TAX IDENTIFICATION NUMBER next to the appropriate listing below, sign, date and return to:

CITY OF BALDWIN PARK FINANCE DEPARTMENT
14403 East Pacific Avenue
Baldwin Park, CA 91706

Exempt: Yes_____ No_____ Telephone ( ) _____________________________

CORPORATION: _______________________________________________________________________

U.S.A. OR ANY AGENCIES THEREOF: ______________________________________________________

IRS CODE #501 TAX-EXEMPT ORGANIZATION: _____________________________________________

A NON-COMMISSIONED CITY EMPLOYEE: _________________________________________

SOLE PROPRIETOR: ____________________________________________________________________

A PARTNERSHIP: ______________________________________________________________________

OTHER: _______________________________________________________________________(Explain)

_________________________________________ _______________________________________ Signature Date

_________________________________________ _______________________________________ Print Name Title

Page 1 of 1 ends

(Use of City Form is required)

Page 200 of 325 ends

C-26

GUARANTEE

TO THE CITY OF BALDWIN PARK

As a material inducement to the City to award the contract for Project No. CIP 20-129 to the _____________________________________________ , the undersigned (“Guarantor”) has agreed to enter into this guarantee. The Guarantor hereby unconditionally guarantees to the fullest extent allowed by law the following work included in this project: Park improvements and all appurtenant work as per plans and specifications for City Project No. CIP 20-129 Phase C Sod Replacement and Soil Preparation.

Guarantor guarantees that the materials and equipment used by itself and its sub-contractors will be free from defects and that the work will conform to the plans and specifications. Should any of the materials or equipment prove defective or should the work as a whole, or any part thereof, prove defective for any reason whatsoever (except due to intentional torts by the City), or should the work as a whole or any part thereof fail to operate properly or fail to comply with the plans and specifications, Guarantor will, at the City’s sole election: 1) reimburse the City, upon written demand, for all of the City’s expenses incurred replacing or restoring any such equipment or materials, including the cost of any work necessary to make such replacement or repairs; or 2) replace any such defective material or equipment and repair said work completely, all without any cost to the City. Guarantor further guarantees that any such repair work will conform to the plans and specifications for the project. This guarantee will remain in effect for one year from the date on which the contract for the work is accepted by the City.

Guarantor understands and agrees that the City shall have the unqualified option to make any replacements or repairs itself or to have such replacement, repair, performed by the undersigned.

The City shall have no obligation to consult with Guarantor before the City proceeds to perform any repair, replacement, or work itself. If the City elects to have Guarantor perform said repair, replacement, or work, Guarantor agrees that the repair, replacement, or work shall be performed within 15 days after receipt of a written demand from the City.

If the City elects to perform the replacement, repairs itself, Guarantor agrees to make reimbursement payment within 15 days after receipt of a written demand for payment from the City.

If the Guarantor fails or refuses to comply with this guarantee, the City shall be entitled to all costs and expenses, including attorneys and expert fees, reasonably incurred by reason of Guarantor’s failure or refusal.

Guarantor
___________________________
Date
_________________________________
Contractor

By_________________________________

_________________________________
Title

Page 201 of 325 ends

C-27

Section D SPECIFICATIONS

DEFINITION

The Contract Documents control construction, work performed, and materials furnished hereunder. The Contract Documents are specified in the Construction Contract / Agreement, and include the Specifications for the Work of Improvement.

The Specifications include the Standard Specifications, the Special Provisions that supplement or modify the Standard Specifications, the Technical Provisions, Plans, and Standard Plans.

The Standard Specifications is the 2021 Edition of the Standard Specifications for Public Works Construction, including supplements, written and promulgated by the Southern California Chapter of the American Public Works Association and the Southern California Districts of the Associated General Contractors of California.

The State of California Department of Transportation Standard Specifications 2018 Edition, Standard Plans 2018 Edition, and Manual of Traffic Controls 2014 Edition, and the Standard Plans for Public Works Construction, 2021 Edition are incorporated herein by reference and are hereby accepted as Reference Specifications. These Reference Specifications are intended to govern certain construction materials, methods, and details except as modified herein or are inconsistent with the provisions herein.

The section and subsection numbering system used in these Special Provisions and Technical Provisions corresponds to that used in the Standard Specifications.

SPECIAL PROVISIONS

PART 1 GENERAL PROVISIONS

SECTION 1 - GENERAL

1-2 TERMS AND DEFINITIONS – Revise and/or add the following to this subsection:

Acceptance – The formal written acceptance by the Agency of the completed project.

Addendum – The modification of the plans and/or specifications issued to all prospective Bidders during the period when necessary to change, correct, clarify or further define any phase of the work.

Agency – City of Baldwin Park
Approved Equal – or words of like import refer to and indicate material that has been approved by the City Engineer as similar and equal in all respects and acceptable for use in lieu of the particular materials as specified herein. No "approved equal" material shall be used in any of

Page 202 of 325 ends

C-28
the work unless approval to use it is first obtained in writing from the City Engineer. The City reserves the right to reject any and all materials, either before or after installation that are not specified or approved by the City Engineer in writing. In all cases where proprietary articles are specified, it is the intent of these specifications to permit the use of approved equals, unless specifically prohibited. Requests for "Approved Equal" status for proposed substitutions shall be submitted within ten (10) days after the award of the contract. Such requests shall include substantiating data and the proposed credit to the contract price for the use of such substitution, should it be approved.

Approved, Required, Directed – or words of similar import, refer to and indicate that the work or materials shall be “approved,” “required,” or “directed” by the City of Baldwin Park or its duly authorized representative.

Bidder – any individual, firm, partnership, corporation, or combination thereof, submitting a proposal for the work contemplated, acting directly or through a duly authorized representative.

Board – City Council of the City of Baldwin Park
City – City of Baldwin Park
City Council – The body constituting the awarding authority of the City, namely the City Council of the City of Baldwin Park.

Contractor – The person or persons, co-partnership or corporation, private or municipal, who have entered into contract for this work as parties or party of the second part of his or her legal representatives.

County – County of Los Angeles, California.

Day – Working day or Calendar day as specified in the Construction Contract/Agreement and/or in the Contractor’s Bid Proposal.

Department of Public Works or Department – City of Baldwin Park Public Works Department.

Due Notice – A written notification, given in due time, of a proposed action where such notification is required by the contract to be given a specified interval of time (usually 48 hours or two working days) prior to the commencement of the contemplated action.

Notification may be from City to Contractor or from Contractor to City.

Engineer – The City Engineer of the City of Baldwin Park, acting either directly or through authorized agent.

Inspector – The engineering or technical personnel authorized to act as agents for the Engineer in the supervision of work covered by these Specifications, limited to the particular duties entrusted to him/her or them.

Laboratory – Any laboratory of a public agency or a recognized commercial testing laboratory.

Owner – City of Baldwin Park
Prompt – The briefest interval of time required for a considered reply, including time required for approval by a governing body.

Submittal – Any drawing, calculation, specification, product data, samples, manuals, requests for substitutes, spare parts, photographs, survey data, traffic control plans, record drawings, Bonds or similar items required to be submitted to the City under the terms of the Contract.

1-3 ABBREVIATIONS
1-3.2 Common Usage – Add the following to this subsection, along with those indicated in the Plans:

Page 203 of 325 ends

C-29
AGC Associated General Contractors of America
APWA American Public Works Association
ASA American Standards Association
ASHTO American Association of State Highway and Transportation Officials CALTRANS State of California Department of Transportation or DOT LACPW Los Angeles County Public Works
LACSD County Sanitation Districts of Los Angeles County SCG Southern California Gas Company
SCE Southern California Edison Company
SPPWC Standard Plans for Public Works Construction, 2021 Edition, including all amendments
SSPWC Standard Specifications for Public Works Construction, 2021 Edition, including all amendments
WWECP Wet Weather Erosion Control Plan

1-7 AWARD AND EXECUTION OF THE CONTRACT
1-7.1 General – Add the following to this subsection:

By mutual consent in writing of the parties signatory to the contract, alterations or deviations, increases or decreases, additions or omissions, in the plans and specifications may be made and the same shall in no way affect or make void the contract. 1-7.2 Contract Bonds – Add the following to this subsection:

The performance bond shall remain in effect at least until the date of acceptance by the Agency, unless the Engineer allows the date of substantial completion, or except as otherwise provided.

The payment bond shall remain in effect until the Agency makes the final payment including retention that is due to the contractor.

The contractor warrants and guarantees to the Agency that all work will not be defective.

Therefore, the contractor shall furnish a warranty performance and payment bond equal to at least ten percent of the final contract price or $1,000, whichever is greater, before the contract payment bond may be released or the retention payment paid. The warranty performance and payment bond shall be in effect until at least one year after the date of acceptance of the work by the Agency.

SECTION 2 – SCOPE OF WORK

2-1 WORK TO BE DONE – Add the following to this subsection:

Where the manufacturer of any material or equipment provides written recommendations or instructions for its use or method or installation (including labels, tags, manuals or trade literature), such recommendations or instructions shall be compiled with except where the contract documents specifically require deviations.

2-2 PERMITS – Add the following to this subsection:

Page 204 of 325 ends

C-30
The Contractor shall, at their own expense, obtain a business license from the City of Baldwin Park. The Contractor shall comply will all Federal, State or local laws, ordinances or rules and regulations relating to the performance of the work.

Before starting any construction work, the Contractor will be required to obtain all necessary permits from the City, which may include obtaining a no fee encroachment permit for Work within the public right-of-way, as well as all other permits required from all other agencies.

Should this Project require construction of trenches or excavations which are five (5) feet or deeper and into which a person is required to descend, the Contractor shall obtain a Cal/OSHA permit and furnish the City with a copy before Work can commence on this Project. Contractor shall bear all cost for fees for all agencies except for the City’s permit fees.

The Contractor shall prepare required documentation associated with the permits indicated in the subsections below. The City will submit said documentation to the permitting agencies, unless the City requests the Contractor submit documentation. The Contractor shall not proceed with associated Work until all approvals have been received by the permitting agencies.

Add the following subsections:

2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES

2.5-1 General – Add the following to this subsection:

Parking of the Contractor's vehicles at any given location on City residential streets for more than twenty-four (24) hours, shall not be permitted.

2-6 CHANGES REQUESTED BY THE CONTRACTOR – Add the following to this subsection:

All authorized alterations affecting the requirements and information given on the approved plans shall be in writing. Changes shall not be made to any plan or drawing after the Engineer has approved the same, except by written direction of the Engineer. Should it appear that the work to be done, or any matter relative thereto is not sufficiently detailed or explained in these Specifications, Special Provisions, Technical Provisions, or Plans, the contractor shall apply to the Engineer for such further explanations as may be necessary and shall conform to such explanation or interpretation as part of the original specifications. In the event of doubt or questions relative to the true meaning of the specifications, reference shall be made to the City Council, whose decision thereon shall be final.

2-8 EXTRA WORK – Add the following to this subsection:

The contractor shall proceed with extra work only upon written order from the Engineer. For such extra work the contractor shall receive payment as agreed upon in writing, or shall be paid on force account. Work involving contract unit prices, the contractor shall not exceed any of the quantities in the proposal unless prior authorization from the engineer is obtained in writing.

2-10 DISPUTED WORK – Add the following to this subsection:

Page 205 of 325 ends

C-31
The disputes of construction claims on public works contracts shall be processed in accordance with the applicable provisions of the California Public Contract Code, including Section 20104, et seq. A summary is provided below. Refer to the referenced Code sections for details.

A. In accordance with Public Contract Code Section 20104, and for the purposes of Paragraphs B only, the term “Defined Claim” shall mean a separate demand by the Contractor to the Owner of a value of $375,000 or less, for any of the following: (a) a time extension, (b) payment of money or damages arising from work done by the Contractor pursuant to the Contract Documents and payment of which is not otherwise expressly provided for or the Contractor is not otherwise entitled to, or (c) an amount of payment which is disputed by the Owner.

B. Resolution of Defined Claims
Pursuant to Sections 20104 et seq., of the Public Contracts Code, the provisions of this Paragraph B shall apply to all “Defined Claims,” as such term is defined in Paragraph A (i.e., claims that are in the amount of $375,000 or less).

Page 206 of 325 ends

C-32
Filing and Response to Defined Claim
The Defined Claim shall be in writing, include the documents necessary to substantiate the Defined Claim, and be filed with the Owner on or before the date of the final payment for the work.

If the Defined Claim is less than $50,000, the new Owner shall respond in writing to the Defined Claim within 45 days of its receipt; or the Owner may request in writing within 30 days of receipt of the Defined Claim any additional documentation supporting the Defined Claim or relating to defenses or claims the Owner may have against the Contractor, and in such event the Owner's response shall be submitted to the Contractor within the later of 15 days after the receipt of the further documentation, or the time taken by the Contractor in producing the additional information.

If the Defined Claim is over $50,000, the Owner shall respond in writing to the Defined Claim within 60 days of its receipt, or the Owner may request in writing within 30 days of receipt of the Defined Claim any additional documentation supporting the Defined Claim or relating to defenses or claims the Owner may have against the Contractor, and in such event the Owner's response shall be submitted to the Contractor within the later of 30 days after the receipt of the further documentation, or the time taken by the Contractor in producing the additional information or requested documentation.

Meet and Confer Regarding Defined Claim
If the Contractor disputes the Owner's written response, or if the Owner fails to respond within the prescribed time, to the Defined Claim, the Contractor may notify the Owner in writing within 15 days, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of the demand, the Owner shall schedule a meet and confer conference within 30 days. If the claim or any portion thereof remains in dispute following the meet and confer conference, the Contractor may file a claim pursuant to Government Code Section 900, et seq. For purposes of this Paragraph B, the running of the period of time within which a claim must be filed shall be tolled from the time the Contractor submits the Defined Claim until the time such Defined Claim is denied, including any period of time utilized by the meet and confer conference.

Procedures for Civil Actions Filed to Resolve Defined Claims The following procedures shall apply to any civil action filed pursuant to this Paragraph B:

Non-Binding Mediation – Within 60 days, but no earlier than 30 days, following the filing of responsive pleadings, the court shall submit the matter to non-binding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, and shall be commenced within 30 days of the submittal and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court.

Judicial Arbitration – If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Section 1141.10, et seq., of the Code of Civil Procedure, notwithstanding Code of Civil Procedure Section 1141.11. The civil discovery procedures

Page 207 of 325 ends

C-33
of Code of Civil Procedure Section 2019, et seq., shall apply, consistent with the rules pertaining to judicial arbitration. In addition to the provisions of Code of Civil Procedure Section 1141.10, et seq., (a) arbitrators shall, upon stipulation of the parties, be experienced in construction law, and (b) any party appealing an arbitration award who does not obtain a more favorable judgment shall, in addition to payment of costs and fees, also pay the attorney’s fees on appeal of the other party.

Interest on Award of Judgment
In any suit filed pursuant to Paragraph (G)3.2, the Owner shall pay interest at the legal rate on any arbitration award or judgment, which interest shall begin to accrue on the date the suit is filed in a court of law.

C. Resolution of Claims other than Defined Claims
The provisions of this Paragraph C shall apply to all claims that are not “Defined Claims,” as such term is defined in Paragraph A (i.e., claims that are in excess of $375,000.00).

Written Claim
If the Contractor is not satisfied with any action by the City Council to resolve the protest of any claim other than a Defined Claim, it shall file with the City Council, within fifteen (15) days after such determination, a written claim which shall comply with the requirements for a claim under Division 3.6 of Title 1 (commencing with Section 810) of the California Government Code. The City Council shall take action with respect to any such claim as provided in Division 3.6 of Title 1 of the Government Code. Denial of such claim by the City Council shall be a prerequisite to the institution of any legal proceeding challenging the action of the City Council. If the Contractor fails to file a claim within the time specified herein, it shall be deemed satisfied with the action of the City Council with respect to its protests, and such failure to file a claim shall be deemed to be a waiver of all claims and demands arising out of or relating to this Contract.

Limitation Period
Demand for Arbitration of any claim other than a Defined Claim shall be served upon the Owner within the time limits set forth in Division 3.6 of the California Government Code for commencement of legal proceedings against a local public agency.

Arbitration
Except as provided to the contrary herein, arbitration of any claim other than a Defined Claim may be initiated by the Contractor and shall be conducted in accordance with the provisions of California Code of Civil Procedure Sections 1280, et seq. The parties hereto agree that there shall be a single neutral Arbitrator who shall be selected in the following manner: (1) The Demand for Arbitration shall include a list of five names of persons acceptable to the Contractor to be appointed as Arbitrator. The Owner shall determine if any of the names submitted by Contractor are acceptable and, if so, such person will be designated as Arbitrator; (2) In the event that none of the names submitted by Contractor are acceptable to Owner or if for any reasons the Arbitrator selected in Step (1) is unable to serve, the Owner shall submit to Contractor a list of the five names of persons acceptable to Owner for appointment as Arbitrator to Contractor who shall in turn have 10 days in which to determine if one such person is acceptable; (3) If after Steps (1) and

Page 208 of 325 ends

C-34
(2) the parties are unable to mutually agree upon a neutral Arbitrator, the matter of selection of an Arbitrator shall be submitted to the Los Angeles County Superior Court pursuant to Code of Civil Procedure Section 1281.6.

SECTION 3 – CONTROL OF THE WORK

3-4 AUTHORITY OF THE BOARD AND ENGINEER – Add the following to this subsection:

The Engineer shall retain all written protests filed, and, upon completion of the work, shall submit all such protests to the Board, together with a copy of the Engineer’s prior written decisions for consideration by the Board at the time of final acceptance of the work. The Contractor or its representative may appear and be heard by the Board concerning any such protests. In connection with acceptance of the work and final payment under the Contract, the Board shall make its determination with respect to each protest filed with the Engineer. The decision of the Board shall be final.

3-5 INSPECTION – Add the following to this subsection:

The City may provide inspection for an 8-hour day and 40-hour week for normal working days.

The Contractor, at the City’s overtime rate, shall pay inspection work requested by the Contractor outside of the prescribed working hours.

The Engineer will make, or have made, such inspections and tests as he/she deems necessary to see that the Work is in conformance with the Contract Documents. In the event such inspections or tests reveal noncompliance with the Contract Documents, the Contractor shall bear the cost of such corrective measures as deemed necessary by the Engineer, as well as the cost of subsequent re-inspection and re-testing.

Work done in the absence of inspection by the Engineer may be required to be removed and replaced under the inspection of the Engineer, and the entire cost of removal and replacement shall be borne by the Contractor, regardless of whether the work removed is found to be defective or not. Work covered without the approval of the Engineer shall, if so directed by the Engineer, be uncovered to the extent required by the Engineer, and the Contractor shall similarly bear the entire cost of performing all the work and furnishing all the materials necessary for the removal of the covering and its subsequent replacement, including all costs for additional inspection.

3-7 CONTRACT DOCUMENTS
3-7.1 General – Add the following to this subsection:

The Contractor shall maintain a control set of Plans and Specifications on the Project site at all times. All final locations determined in the field, and any deviations from the Plans and Specifications, shall be marked in red on the control set to show the as-built conditions. This control set of Plans shall also be edited for all Addenda, Requests for Information, Change Orders, field changes not involving cost, and any other variation that occurred during construction. Upon completion of all Work, the Contractor shall return the control set to the City Engineer. Final payment will not be made until this requirement is met.

Page 209 of 325 ends

C-35
Where a work feature is shown on the drawings or identified in the Specifications but is not specifically indicated as an item in the Bid sheets, and there is no ambiguity regarding the requirement to construct, install, or construct and install that work feature, the Contractor is required to complete the work feature. All costs to the Contractor for constructing, installing, or both constructing and installing such a work feature shall be included in the Bid.

3-7.2 Precedence of Contract Documents – Amend this subsection with the following order:

In case of conflict between Contract Documents, the document highest in precedence shall control. The precedence shall be as follows:
1) Permits
2) Change Orders
3) Construction Contract / Agreement
4) Addenda
5) Bid Proposal
6) Technical Provisions
7) Special Provisions
8) Plans (AutoCAD files will be made available for horizontal control) 9) Standard Plans
10) Standard Specification
11) Reference Specifications

Detail drawings shall take precedence over general drawings.

3-8 SUBMITTALS

3-8.4 Supporting Information – Replace the second paragraph in this subsection with the following:

1. List of subcontractors per 3-3.

2. Control set of plans per 3-7.1.

3. List of materials per 4-4.

4. Certificates of Compliance per 4-5.

5. Construction schedules per 6-1.

6. Spill Prevention and Emergency Response Plan per 3-12.5.3.

7. Landscape and irrigation materials/components per Landscape Technical Specifications.

3-12.3 Noise Control – Add the following to this subsection:

Care shall be taken as to not make excessive noise adjacent to residences before 8:00 a.m. Sound control shall conform to the provisions in Section 7-1.01I, “Sound Control Requirements,” of the State Specifications, these Provisions, and the Baldwin Park Municipal Code.

Page 210 of 325 ends

C-36
The noise level from the Contractor’s operations, between the hours of 8:00 p.m. and 7:00 a.m. (requires advance night work approval), shall comply with City of Baldwin Park Municipal Code.

Said noise level requirements shall apply to all equipment on the job or related to the job, including, but not limited to, trucks, transit mixers or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel.

Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore.

3-12.6.3 Storm Water Pollution Prevention Plan (SWPPP)– Replace this subsection with the following:

Prior to beginning any work, if applicable, the Contractor shall review and comply with the existing SWPPP.

3-13 COMPLETION, ACCEPTANCE, AND WARRANTY
3-13.3 Warranty – Add the following to this subsection:

The Contractor shall and hereby does guarantee all work for a period of one (1) year after the date of acceptance of the work by the City and shall repair and replace any and all such work, together with any other work which may be displaced in so doing, that may prove defective in workmanship and/or material within the one (1) year period from date of acceptance, ordinary and normal wear and tear excepted.

SECTION 4 - CONTROL OF MATERIALS

4-3 INSPECTION
4-3.1 General
4-3.1.1 Inspection Requirements – Add the following subsection:

At the option of the City Engineer, the source of supply of each of the materials shall be approved by the Engineer before delivery is started and before such material is used in the work.

Representative preliminary samples of the character and quality prescribed shall be submitted by the contractor or producer of material to be used in the work, for testing or examination as desired by the Engineer. All tests of industry materials furnished by the contractor shall be made in accordance with commonly recognized industry standards or special methods and tests as prescribed in these specifications.

The contractor shall furnish such samples of materials as are requested by the Engineer, without charge. No material shall be used until the Engineer has approved it. Samples will be secured and tested whenever necessary to determine the quality of material.

SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES

Page 211 of 325 ends

C-37
5-2 SPECIAL NOTICES:
5-2.1 Public Notifications for Construction – Add the following subsection:

Residents, Businesses, Schools, Churches, etc., located on streets that will be impacted by construction activities must be notified by the Contractor in the form of a written construction advisory letter at least one week in advance (but not more than 4 weeks) of work commencing.

Written notification shall include:
 Description of Work
 Hours of Work
 Dates of Work
 Parking and Access Restrictions
 Contractor Contact Information
The Contractor shall provide the construction advisory letters, subject to the approval of the City Engineer, to all affected properties, adjacent to the work site as required in these specifications and in the Plans prior to construction on each “treet.
"Temporary No Park”ng Signs" shall be posted at least 72 hours, but no more than 96 hours, in advance of the work. These signs shall read “Temporary No Parking Tow-Away CVC ”2654 (d)".

The signs shall be placed no more than 100 feet apart on each side of the street and at shorter intervals if conditions warrant. The Contractor shall provide the signs and will be responsible for adding clear and precise dates and hours of closure to the signs. All signs shall be removed within 24 hours after the effective date. If the date of closure is changed, the Contractor will be responsible for reposting the signs in accordance with the above requirements.

The Contractor shall notify the following public agencies before commencing any work:

Baldwin Park Police Department – Notify Watch Commander, Telephone: (626) 960-1955 (If Watch Commander is not available, notify Dispatcher at (626) 960-4011 ext. 434 Baldwin Park Engineering Division – Project Engineer, Telephone: (626) 813-5255 Baldwin Park Maintenance Division – Notify Maintenance Operations Manager, Telephone: (626) 960-1955
LA County Fire Department, Station 29 - Notify Dispatcher, Telephone: (626) 337-0525

5-3 LABOR
5-3.3 Payroll Records – Add the following to this subsection:

Certified Payroll Records shall be submitted to the Engineer every two weeks beginning with the actual start day of construction, and shall be consecutively numbered until the completion of the work. Progress payments will be withheld pending receipt of any outstanding reports.

5-3.4 Hours of Labor – Add the following to this subsection Eight hours constitutes a legal day’s work. The Contractor shall forfeit, as a penalty to the City, $25.00 for each worker employed in the execution of the contract by the Contractor or any subcontractor under them for each calendar day during which such worker is required or permitted to work more than eight hours in any one calendar day and 40 hours in any one

Page 212 of 325 ends

C-38
calendar week in violation of the provisions of the Labor Code, and in particular, Sections 1810 to 1815 thereof, inclusive, except that work performed by employees of Contractors in excess of eight hours per day, and 40 hours during any one week, shall be permitted at not less than one and one-half times the basic rate of pay, as provided in said Section 1815.

The Contractor will assure that a qualified supervisor is present at all times when work is being performed.

5-4 INSURANCE
5-4.2 General Liability Insurance – Add the following to this subsection:

The Contractor shall, at its own expense, take out and maintain during the life of the contract such public liability and property damage insurance protecting the contractor and any sub- contractor performing work covered by the contract from claims for damages for personal injury, including accidental death, as well as from claims for property damages, which may arise from his operations under the contract, and shall protect him and the City from claims for such damages, naming the City as an additional insured under the policy, whether such operations be by themself or by any sub-contractor or by anyone directly or indirectly employed by either of them and the amount of such insurance shall be as follows:

Public Liability Insurance in an amount not less than one million dollars ($1,000,000) for injuries, death, to any one person, and subject to the same limit for each person in an amount not less than five million dollars ($2,000,000.00) on account of one accident.

Property Damage Insurance in an amount of two hundred and fifty thousand dollars ($250,000.00) resulting from any one accident that may arise from the operations of the Contractor in performing the work provided herein.

If and whenever the Contractor or any sub-contractor, in carrying on the contract operations, shall use and operate automobiles, trucks or other vehicles on public streets and highways, each shall carry, at his own expense, Automobile Public Liability and Property Damage Insurance, with limits of not less than two hundred and fifty thousand dollars ($250,000.00) for any one person and one million dollars ($1,000,000.00) for any one accident, and two hundred thousand dollars ($200,000.00) property damage.

Equivalent Combined Policy – A combined single limit policy with aggregate limits in the amount of five million dollars ($2,000,000.00) will be considered equivalent to the required minimum limits specified above. The term “public streets and highways” shall be deemed to include without limiting the generality thereof, all roads, roadways and thoroughfares used for access to the site of the work.

The Contractor shall furnish the City with satisfactory proof of insurance required. Such proof shall be furnished with the executed Contract Documents, naming the City as an additional insured.

5-4.3 Worker’s Compensation Insurance – Add the following to this subsection:

The Contractor shall furnish the Agency with satisfactory proof of insurance required. The insurance shall be taken out with a responsible insurance carrier authorized under the laws of the State of California and satisfactory to the City. In case any work is sublet, the contract shall

Page 213 of 325 ends

C-39
require the subcontractor similarly provide Worker’s Compensation Insurance for the subcontractor’s employees. The Contractor shall provide, and shall cause each subcontractor to provide, adequate insurance for the protection of his employees not otherwise protected.

5-7 SAFETY
5-7.1 Work Site Safety
5-7.1.1 General – Add the following subsection:

The Contractor shall maintain site lighting throughout the duration of the Project. If the existing lighting is removed, then the Contractor shall provide temporary lights, such that the same level of lighting is provided during construction as was existing prior to Project implementation. Costs associated with temporary lighting shall be considered as included in associated Bid items and no additional compensation will be allowed therefor.

SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK

6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK
6-1.1 Construction Schedule – Add the following to this subsection:

Two-week lookahead schedules will be required at weekly construction meetings as indicated in Section 6-1.1.2.

6-1.1.1 Pre-Construction Meeting – Add the following subsection:

Prior to commencing work, there will be a pre-construction meeting to be attended by the Engineer, Contractor, Design Engineer, Inspector, and Street Superintendent at which time the Contractor shall be informed of specific instructions necessary to meet construction quality standards and other documentation which may be required. The Contractor shall submit a detailed construction schedule, components, parts and materials specifications proposed for use on the project during this meeting.

Unless previously submitted to the City Engineer, the Contractor shall bring to the pre- construction conference copies of each of the following:

1. Construction Schedule.

2. Procurement schedule of major equipment and materials and items requiring long lead time.

3. Shop drawing/sample submittal schedule.

4. Preliminary schedule of values (lump sum price breakdown) for progress payment purposes.

5. Written designation of the on-site field superintendent and the Project manager. Both daytime and emergency telephone numbers shall be included in the written designation.

The purpose of the conference is to designate responsible personnel and establish a working relationship. The parties will discuss matters requiring coordination and establish procedures

Page 214 of 325 ends

C-40
for handling such matters. The complete agenda will be furnished to the Contractor before the meeting date. The Contractor shall be prepared to discuss all of the items listed below.

1. The Contractor’s construction schedule.

2. Notification of local residents before starting any Work and keeping them informed throughout the Project.

3. Procedures for transmittal, review, and distribution of the Contractor’s submittals.

4. Processing applications for payment.

5. Maintaining record documents.

6. Critical Work sequencing.

7. Maintaining sewage service during construction, including proposed by-passes.

8. NPDES requirements.

9. Field decisions and Change Orders.

10. Use of Project site, office and storage areas, security, housekeeping, and the City’s needs.

11. Major equipment deliveries and priorities.

12. Traffic control.

13. Any other item that the City representative states is relevant to the meeting.

6-3 TIME OF COMPLETION
6-3.1 General – Add the following to this subsection:

Contractor shall commence the services pursuant to these specifications upon receipt of a written notice to proceed and shall perform all services within 17 Working Days. When requested by the Contractor, the City Engineer may approve extensions to the time period(s) specified in the Schedule of Performance in writing.

Where a single shift is worked, eight (8) consecutive hours between 7 a. m. and 5 p.m. shall constitute a day’s work (Working Day) at straight time for all workers. Forty (40) hours between Monday, 7 a.m., and Friday, 5 p.m. shall constitute a week's work at straight time. Holidays as herein referred to shall be deemed to be:

New Year’s Day Christmas Day
Martin Luther King Day Columbus Day
President’s Day Veterans Day
Memorial Day Thanksgiving Day & day after
Independence Day
Labor Day

Construction work is limited to normal working hours unless prior written approval is obtained from the Engineer. Normal working hours are between the hours of 7 a.m. and 6 p.m. Grading,

Page 215 of 325 ends

C-41
paving, sweeping, idling trucks & equipment will not be permitted prior to 7:00 am. Deviation from these hours and days will not be permitted unless prior written consent is obtained from the City Engineer, except in emergencies involving immediate hazard to persons or property.

The Contractor shall obtain approval for any deviation from regular working hours or days by submitting a written request to the Engineer at least 5 working days in advance, for approval by the City Engineer. This includes, but not limited to, the following restrictions:

Thanksgiving Holiday from the end of the day on the preceding Friday, to the following Monday morning.

Christmas & New Years Holidays from the end of the day on any Friday preceding the 24th of December 2026 to the 2nd of January 2024.

Weekends from 5:00 pm Friday to 7:00 am Monday.

Night/Extended work hours (5:00 pm – 7:00 pm) can be authorized on a day-by-day basis with prior approval from the City Engineer. Night work requires a special permit with inspection fees and advance approval by the City Engineer.

Expenses for such deviations shall be included in the proposal prices, and will not be considered as an addition to the contract.

6-6 SUSPENSION OF THE WORK
6-6.1 General – Add the following to this subsection:

Should suspension of work be ordered by reason of the failure of the contractor to carry out orders or to perform any provisions of the contract; or by reason of weather conditions being unsuitable for performing any item or items of work; the contractor, at its expense, shall do all the work necessary to provide a safe, smooth, and unobstructed passageway through construction for use by public traffic during the period of such suspension. In the event that the contractor fails to perform the work above specified, the City will perform such work and the cost thereof will be deducted from payment due or to become due to the contractor.

If the Engineer orders a suspension of all of the work or a portion of the work which is the current controlling operation or operations due to unsuitable weather or to such other conditions as are considered unfavorable to the suitable prosecution of the work, the days on which the suspension is in effect shall not be considered working days.

If a portion of work at the time of such suspension is not a current controlling operation or operations, but subsequently does become the current controlling operation or operations, the determination of working days will be made on the basis of the then current controlling operation or operations.

If a suspension of work is ordered by the Engineer, due to the failure on the part of the contractor to carry out orders given or to perform any provision of the contract, the days on which the suspension order is in effect shall be considered working days if such days are working days as defined.

6-9 Liquidated Damages – Add the following to this subsection:

Page 216 of 325 ends

C-42
It is agreed by the parties that if the improvements are not completed by the time prescribed to complete the work, City and Contractor agree that Contractor will pay to City, not as a penalty, but as predetermined liquidated damages, the sum specified in the Construction contract / Agreement (Five Hundred Dollars - $500.00 - per day ) for each and every working day’s delay beyond the time prescribed to complete the work.

Similarly, it is further agreed that if signal operations, road striping, and signing are not coordinated or traffic lanes are not kept open for public use, on the days, at the times, and in the manner specified in the Contract Documents and the City approved traffic control plans, City and Contractor agree that Contractor will pay to City, not as a penalty, but as predetermined liquidated damages, the sum of Five Hundred Dollars ($500.00) per hour for each and every hour that:
(a) Contractor fails to keep open any traffic lane for public use as required by these Special Provisions and the City approved traffic control plans; (b) Contractor fails to temporary stripe the roadway prior to opening up the roadway for normal vehicular travel immediately following resurfacing; (c) Contractor fails to permanently re-stripe the roadway and remove any conflicting striping or delineation within seven (7) calendar days following resurfacing of that section of roadway;
(d) Contractor fails to remove signs which conflict with new striping or fails to install signs required by the Contract Documents which are necessary for safe traffic movement; and/or
(e) Contractor fails to turn on or coordinate modification to existing signal operations as required by these Special Provisions and the City approved traffic control plans.

Contractor agrees to pay such liquidated damages, and in case the same are not paid, Contractor agrees that the Agency may deduct the amount thereof from any money due or that may become due the Contractor under the contract.

It is further agreed that in case the work called for under the contract is not finished and completed in all parts and requirements within the time specified, the Agency shall have the right to extend the time for completion or not, as may seem best to serve the interest of the City; and if it decides to extend the time limit for the completion of the contract, it shall further have the right to charge to the Contract, their heirs, assigns or sureties; and to deduct from the final payment for the work, all or any part, as it may deem proper, of the actual cost of engineering, inspection, superintendence, and other overhead expenses which are directly chargeable to the contract, and which accrue during the period of such extension.

SECTION 7 – MEASUREMENT AND PAYMENT

7-1 MEASUREMENT OF QUANTITIES FOR UNIT PRICE WORK
7-1.2 Methods of Measurement – Add the following to this subsection:

Page 217 of 325 ends

C-43
Payment of each item will include full compensation for furnishing all labor, materials, tools, equipment and backup equipment; transportation and technical competence for performing all Work necessary to complete each item as indicated on the Plans and as specified in these Contract Documents, including but not limited to obtaining all applicable certifications necessary for specialty personnel and major equipment, and all other applicable permits; securing a storage yard to store all equipment and materials to be used on the job (if needed), disposal of waste materials, restoration of the site, etc. Costs for mobilization/demobilization shall be included as part of the other items and no additional payment will be allowed.

7-2 LUMP SUM WORK – Add the following to this subsection:

The Contractor shall, within five (5) Working Days of receipt of a request from the Engineer, submit a complete breakdown of Lump Sum Bid prices showing the value assigned to each part of the Work, including an allowance for profit and overhead. In submitting the breakdown, the Contractor certifies that it is not unbalanced and that the value assigned to each part of the Work represents its estimate of the actual cost, including profit and overhead, of performing that part of the Work. No extra costs shall be allowed for providing these breakdowns.

7-3 PAYMENT
7-3.1 General – Add the following to this subsection:

When an item of Work is not listed in the Bid Schedule, the cost of such Work shall be considered to be included in the cost of the other Work that is listed. The Contractor is to provide all labor, material, equipment, and incidentals necessary to complete the Project in accordance with the Contract Documents, including the following:

a) All "Special Provisions" Work required to complete the Project in a safe and orderly manner including, but without being limited to, safety measures, hoists, flagmen, clean- up, barricades, fences, temporary utilities, utility fees and charges, parking for the Contractor's and subcontractor's personnel, and temporary facilities as may apply to this Work;
b) All insurance in accordance with the insurance requirements of the Contract; c) Maintain and update current record drawings onsite (3-7.1). Upon project completion, provide the City a legible set of record drawings, operation and maintenance manuals, warranties, and guarantees;
d) All permits required;
e) Repair or replace all existing improvements (public or private) damaged by the Contractor. The Contractor is responsible to provide evidence of pre-existing conditions; f) Watchman or security service, as necessary;
g) Perimeter fencing of work zones and staging area as necessary for public safety and protection of equipment and materials (including movement of fencing to better protect active construction areas);

Page 218 of 325 ends

C-44
h) Dust control, street cleaning, and protection and/or replacement of existing surfaces or properties;
i) Submittal Log of all submittals required to the City including, but not limited to, material, products, concrete testing data, batch plant testing data, shop drawings, and traffic control and phasing plans. Said log shall be updated for each project meeting.

7-3.2 Partial and Final Payment – Add the following to this subsection:

Prior to judicial determination of any claim or claims or in accord therewith, the City may apply an amount withheld to the payment and satisfaction of sub-contractors for labor and services rendered and materials furnished. In so doing, the City shall be deemed the agent of the Contractor and any payment so made by the City shall be considered as a payment made in good faith; provided that such payment shall not be made except by court order if the Contractor furnished a bond satisfactory to the City to indemnify the City against any lien or claim.

If any lien or claim should remain unsatisfied after final payment to the Contractor, the Contractor, upon demand, shall refund to the City any money that the latter may be compelled to pay to discharge such lien or claim, including all costs and reasonable attorney’s fees.

Before the City will make the final payment to the Contractor, the Contractor shall furnish the City with lien releases from all sub-contractors and suppliers of material, together with a certified statement that the releases represent all the materials furnished and all the sub-contractors engaged for the work.

7-3.4 Mobilization – Add the following to this subsection:

Mobilization shall consist of preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies and incidentals to the project site.

Mobilization shall additionally include the following:
 Submittal of all required documents, i.e.; Construction Schedule, Material Submittals, Bonds.
 Establishment of any temporary on-site sanitary facilities and portable water facilities as required.
 Establishing access from the public road to the specific work area including repairs and reconstruction to existing improvements, if necessary.  Furnishing and installing project security/construction perimeter fencing (during the construction period), including the movement of said fencing as needed to better protect active construction areas.
 All irrigation system repairs due to damage caused during the Contractor’s removal of the sod, soil preparation and fine grading, sod installation, and any other associated work. The contractor shall endeavor to protect the irrigation system and adjacent improvements at all times.

 Prior to the start of work, the contractor shall perform a complete irrigation system check to verify the performance and condition of the irrigation system and notify the

Page 219 of 325 ends

C-45
City of any deficiencies, damage, or non-operational components identified before commencing work. Any damage caused by the contractor to the existing irrigation system or surrounding improvements during the course of work shall be repaired or replaced by the contractor at no additional cost to the City.

 Arranging for work and storage yard.
 Underground Service Alert (USA) Markings – The contractor shall be responsible for the scheduling of utility markings prior to construction start and complete removal per a method approved by the Engineer before acceptance of the work.  Demobilization and final site cleanup and restoration to the satisfaction of the Engineer.

All costs involved in complying with the requirements of this paragraph shall be absorbed or included in the prices paid for the various contract items of work and no additional compensation will be allowed.
7-4 PAYMENT FOR EXTRA WORK
7-4.3 Markup – Add the following to this subsection:

Markup shall be limited to the following:

Labor 15%
Materials 15%
Equipment Rental 15%
Other 15%

7-5 DESCRIPTION OF BID ITEMS
A. GENERAL

Bid Items described are presented to indicate major categories of the work for purposes of comparative bid analyses, payment breakdown for monthly progress payments and to comply with the California Labor Code relating to the price for sheeting, shoring, and bracing of excavations. Bid items are not intended to be exclusive descriptions of work categories and the Contractor shall determine and include in its pricing all materials, labor, and equipment necessary to complete each Bid Item (work phase) as shown and specified.

B. CONTRACTOR’S COST BREAKDOWN
Lump Sum Price Breakdown – For work to be performed for a lump sum price, the Contractor shall submit a price breakdown to the Construction Manager prior to the first payment and within ten (10) days after Notice to Proceed. The price

Page 220 of 325 ends

C-46
breakdown, as agreed upon by the Contractor and the Construction Manager, shall be used for preparing future estimates for partial payments to the Contractor, and shall list the major items of work with a price fairly apportioned to each item.

Mobilization, overhead, bond, insurance, other general costs, and profit shall be prorated to each item so that the total of the prices for all items equal the lump sum price. At the discretion of the Construction Manager, mobilization, bond, and insurance costs may be provided for separately if accompanied by invoices to verify actual expenses.

The price breakdown shall be generally in the same format as the Contract specifications, divisions, and subdivisions, with major items of Work listed individually. The price breakdown shall be by structure, civil, landscaping, or other logical division of work. The price breakdown for architectural, structural, mechanical, and electrical work shall include separate items for identifiable portions of the structures. The price breakdown shall include separate allowances for any testing and startup work required. Measurable approximate quantities of work performed by the Contractor or its subcontractors shall be provided. For quantities that are the sum total of several individual quantities, backup summaries shall be provided which list the individual descriptions and quantities.

These summaries then will be used to determine the quantities of work in place in subsequent progress payment requests.

The above is a statement of the intent of the Contract Documents to provide a moderate level of detail, acceptable to the Construction Manager, to allow a fair and reasonable estimate to be made of the value of Work installed. The detail of the price breakdown must be sufficient to provide timely processing of the monthly progress payment request.

The price breakdown will be subject to the approval of the Construction Manager, and upon request, the Contractor shall substantiate the price for any or all items and provide additional level of detail, including quantities of Work. The price breakdown shall be sufficiently detailed to permit its use by the Construction Manager as one of the bases for evaluating requests for payments. The Construction Manager shall be the sole judge of the adequacy of the price breakdown.

C. Bid Item Descriptions

1. Remove and Dispose of Sod – The unit price paid includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals associated with

Page 221 of 325 ends

C-47
all preparatory and operational work necessary to remove the existing sod and dispose of it in conformance with State and Local requirements. The contractor shall endeavor to remove sod & roots uniformly and consistently to preserve existing slopes and drainage patterns, and to not create dips or depressions. The contractor shall protect the existing irrigation system and adjacent improvements in place. Sod shall be removed from the project site immediately upon removal; stockpiling will not be allowed.

Remove and Dispose of Sod – Square Feet

2. Soil Preparation and Fine Grading – The unit price paid includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals associated with all preparatory and operational work necessary to rototill existing subgrade to a minimum depth of 8 inches (after sod removal); remove and dispose of rock and debris larger than 1 inch (including smaller rock and debris in concentrated clusters collectively larger than 1 inch) in the upper 8 inches of subgrade; perform minor grading, as necessary, to maintain existing grades and to ensure proper industry standard slopes and drainage; complete agronomist testing; amend soil by rototilling fertilizer and amendments into the upper 6 inches of subgrade; and complete final agronomist testing after amending soil. The contractor shall assume that 80 cubic yards of rock and debris will be removed and disposed of, and the unit price paid will include this work. The contractor shall protect the existing irrigation system and adjacent improvements in place. Please refer to technical specifications. Rock and debris shall be removed from the project site immediately upon removal; stockpiling will not be allowed.

Soil Preparation and Fine Grading - Square Feet

3. Sod Installation – The unit price paid includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals associated with all preparatory and operational work necessary to furnish and install hybrid Bermuda “Tahoma 31” sod suitable for heavy, year-around soccer use.

Contractor shall ensure proper soil-to-root contact and uniform installation across the entire field area, and shall install in accordance with industry best practices for sports turf establishment. Please refer to technical specifications.

Sod Installation - Square Feet

4. Ninety (90) Day Sod Maintenance Period – The lump sum price paid will include mowing twice per week, fertilization, weeding and pest control, and irrigation management for a period of ninety (90) days. Perimeter fencing shall not be

Page 222 of 325 ends

C-48
removed until the end of the maintenance period. The period will be extended if the sod is not in a growing and healthy condition. Please refer to technical specifications.

Sod Maintenance – Lump Sum

A. 12-month (365-Day) Sod Maintenance Period – The lump sum price paid will include mowing twice per week, fertilization, weeding and pest control, and irrigation management for a period of 12 months (365 days). The period will be extended if the sod is not in a growing and healthy condition. Please refer to technical specifications.

Sod Maintenance – Lump Sum

***END OF SECTION**

Page 223 of 325 ends

D-1

TECHNICAL PROVISIONS

GENERAL NATURE OF WORK
The work to be performed under this contract is described in the Notice Inviting Sealed Bids.

PLANS AND TECHNICAL SPECIFICATIONS
The plans to be utilized in conjunction with these specifications are the approved City of Baldwin Park.

INTERPRETATION OF SPECIFICATIONS
The Engineering Division, City of Baldwin Park, shall be the interpreting authority of technical specifications for City Project No. CIP 20-129 Phase C.

CONTRACTOR LICENSE
The contractor shall hold the following licenses:
 City Business License.
 A California “A” and or "C 26" License.

PART 4 EXISTING IMPROVEMENTS

SECTION 400 PROTECTION AND RESTORATION

400-1 GENERAL – Add the following to this subsection:

All costs to the Contractor for protecting, removing, restoring, relocating, repairing, replacing, or reestablishing existing or proposed improvements shall be included in the Bid. Existing or proposed improvements damaged or removed without written authorization from the Engineer shall be replaced by the Contractor at no cost to the City. The Contractor shall leave the Work area in the same or better condition as compared to before beginning Contract Work.

402-6 COOPERATION – Add the following to this subsection:

The Contractor’s attention is directed to the fact that Work may be conducted at or adjacent to the site by other contractors during the performance of the Work under this Contract. The Contractor shall conduct its operations so as to cause a minimum of interference with the work of such other contractors, and shall cooperate fully with such contractors to provide continued safe access to their respective portions of the site, as required to perform work under their respective contracts. Compensation for compliance shall be included in the various items of the Work, and no additional compensation shall be allowed, therefor.

Page 224 of 325 ends

D-2

Exhibit A SCHEDULE OF PERFORMANCE AND TIME OF

COMPLETION

Attention is directed to the provisions of Section 8-1.03 ("Beginning of Work"), Section 8-

1.06 ("Time of Completion"), and Section 8-1.07 ("Liquidated Damages"), of the State Specifications, and these Provisions.

The Contractor shall commence construction work within the week of June 8, 2026.

The Contractor shall diligently prosecute the work to completion before the expiration of 17 Working Says after the "start of work on the contract.”

The Contractor and its securities will pay the sum of one thousand dollars ($1,000) as liquidated damages for each working day of delay in the performance of the work in this agreement and as shown on the plans.

Page 225 of 325 ends

D-3

Exhibit C

SPECIFICATION APPENDIX

CONTENTS:
1) Technical Specifications
2) Compaction Testing Results
3) Agronomist Test (prior to recent soil amendments)

Page 226 of 325 ends

SECTION 32 62 23 - SODDING - 1
SECTION 32 92 23 - SODDING

PART 1: GENERAL

1.01 DESCRIPTION

A. The General Provisions shall apply to all Sodding work operations. Provide all labor, materials, tools, transportation, equipment, and incidentals necessary to perform work as indicated on the Plans and as herein specified.

B. Related Sections.

Section 32 80 00: Irrigation System
Section 32 93 43: Trees
Section 32 93 95: 90 Day Maintenance Period
Section 32 90 00: Landscaping

C. The Standard Specifications for Public Works Construction, “Greenbook”, latest edition, is referenced as if herein contained and the Contractor shall keep a copy at the project site. These Specifications shall supersede conflicts with information given in the “Greenbook”, unless otherwise determined by the City.

D. Defin
itions.

1. City: City of Baldwin Park

2. Engineer: City En gineer, or the City Engineer’s designated representative.

3. ASTM: American Society of Testing Materials

E. All vendors, suppliers, and manufacturer’s representatives and the associ ated addresses, phone, and fax numbers on the Plans and in the Specifications are listed for convenience only. They are subject to change and their inclusion in no way constitutes an endorsement by the City.

1.02 QUALITY ASSURANCE

A. Comply with all applicable local, state, federal requirements regarding materials, methods of work, and disposal of excess and waste materials.

B. Grower’s directions, specifications and detailed drawings will be followed in all cases where articles used furnish directions covering points not delineated on the Plans or Specifications.

C. The work included in this section wi ll be done to the satisfaction of the City and decision by the Engineer as to the true construction meaning of the Plans and Specifications will be final.

D. All drop slips for sod fertilizers shall be given to the City.

Page 227 of 325 ends

SECTION 32 62 23 - SODDING - 2

1.03 ENVIRONMENTAL REQUIREMENTS

A. Do not install sod when ambient temperatures may drop below 45 degrees F (12 degrees C) or above 95 degrees F (39 degrees C).

B. Do not install sod when wind velocity exceeds 30 mph (48 k/hr).

C. Do not install sod when soil is overly compacted preventing water permeability.

Rototill as necessary to allow for plant establishment, see Part 3 Execution.

PART 2: PRODUCTS

2.01 REFERENCES

A. ANSI Z60.1 - Nursery Stock.

B. California State Department of Agriculture - Regulations for nursery inspections, rules, and grading.

2.02 SOD

A. Sod shall be Bandera Bermuda and grown by an established sod nursery having been in the business of growing sod a minimum of five (5) years Sod shall be free of turf disease, insects, or weeds, and capable of healthy, vigorous growth.

B. Sod shall be grown in a blown sand medium and it shall be cut with a 1/2” to 3/ 4” thickness of soil that completely covers the root zone. Sod shall be delivered to the site in big rolls. The sod shall arrive vigorous and have a lush appearance, uniform texture and dark green color throughout with no dead or dying edge. The sod shall be sufficiently dense to bear handling and placement without tearing.

C. Remove all nylon mesh from sod prior to installation.

D. Sod may be obtained from:

West Coast Turf
(888) 893-8873

2.03 FERTILIZERS, SOIL CONDITIONING MATERIALS AND WATER

A. Ge neral.

1. Fertilizing and soil conditioning materials shall comply with the applicable requirements of the City’s Standards and Specifications. All

Page 228 of 325 ends

SECTION 32 62 23 - SODDING - 3
materials shall be packaged first grade, commercial quality products identified as to source, type of material, weight, and manufacturer’s guaranteed analysis. Fertilizing and soil conditioning material shall not contain toxic ingredients or fillers in quantities harmful to human life, animals, or plants.

2. The Contractor shall furnish to the Engineer the Cer tificate of Compliance stating that the material substantially meets the City’s specifications.

3. Exact fertilizing and conditioning materials and the required composition and quantities shall be determined by the agronomic soils test.

B. Commercial Fertilizer.

1. Commercial fertilizer shall be a palletized or granular product having a chemical analysis as specified on the Plans or in the Specifications.

Commercial fertilizer shall be free-flowing material delivered in unopened sacks. Material which becomes caked or otherwise damaged shall not be used.

2. Pre-planting fertilizer composition to be Best 6-24-24XB. Post-planting composition shall be Best 6-24-24XB. Fertilizer shall provide one pound of P and K per 1,000 square feet. Nitrogen shall not exceed 1/3 pound per 1,000 square feet. Exact composition and type to be determined by agronomic soil test.

3. Fertilizer can be obtained from:

J.R. Simplot
Lathrop, CA 95330
Phone: (209) 858-2511
Fax: (209) 858-2519

C. Water.

1. Water shall be clean, fresh, and free of substances or matter which could inhibit vigorous growth of plants.

2. Water shall be supplied at Contractor’s expense at no additional cost to the City through the end of the maintenance period.

Page 229 of 325 ends

SECTION 32 62 23 - SODDING - 4
PART 3: EXECUTION

3.01 FERTILIZING

A. Two to three days prior to sodding, fertilize with J.R. Simplot Best 6-24-24XB at one pound of P and K per 1,000 square feet. Exact quantity shall be determined by the agronomic soil test

Adequately irrigate after application.

B. Fifteen days after sod installation is complete, fertilize as above with J. R. Simplot Best 16-24-24XB

3.02 INSTALLING SOD

A. Soil conditioning and fine grading s hall be completed before sodding. No heavy equipment shall operate over the subgrade after grading is completed.

B. The subgrade shall be moist but not wet when sod is laid. Sod shall be laid with closely fitted joints, and the ends of the trips shall be staggered. Openings shall be plugged with sod.

C. Within two hours after installing sod and before rolling, the sod shall be adequately irrigated with a minimum of 1/2” of water. All seams and joints shall then be rolled until the sod is well bonded to the subgrade.

D. The area shall then be watered thoroughly with 2 to 4 inc hes of water to penetrate the subsoil at least 8 inches. Watering shall be repeated as necessary to keep the sod moist until rooted into the subgrade. Sodded areas shall be protected against foot traffic until the sod is well established.

3.03 MAINTENANCE

A. Maintenance period will be a minimum of ninety (90) days after Date of Acceptance by the City of all sod installation.

B. Maintenance includes:

1. Water, weed, fertilize, mow, edge and spray as necessary to promote a healthy growing condition. Keep project neat and attractive throughout the maintenance period.

2. Applying he rbicides for weed control, as needed, or directed by City, in accordance with manufacturer’s instructions. Remedy damage resulting from the use of herbicides.

3. Exterminate rodents and insects as required.

Page 230 of 325 ends

SECTION 32 62 23 - SODDING - 5

4. Adjus t irrigation system scheduling to sufficiently saturate root zone a. Adjusting elevation of heads to new finish grade.
b. Adjust head locations / add head locations to eliminate overthrow on sidewalks.

5. Repair or replace any damaged item caused by vehicles, vandals, bicycles, or foot traffic during the maintenance period.

6. (During growing season) fertilize turf every four weeks with one pound of nitrogen per 1,000 square feet in a complete fertilizer product (4-1-4 ratio).

C. Maintenance period may be extended if turf grass and other plant material is not in a healthy growing condition. When all maintenance work has been completed to the satisfaction of the Engineer, the Contractor will be released through written notification by the Engineer.

D. Mow turf a minimum of two (2) times a week with the first mowing to be completed seven (7) days after installation of sod. Maintain a mowing height of 3/8” to ¾” inches. Do not cut more than 1/3 of grass blade at anyone mowing.

Grass shall be mowed with a sharp power-driven reel mower. Clippings shall be collected and removed.

PART 4: PAYMENT

4.01 TURF-SOD

Payment for Turf-Sod shall be made at the contract unit price per square foot (SF) as set and shall include full compensation for all labor, materials, tools, equipment, and incidentals for doing all work involved.

4.02 SOD MAINTENANCE

Payment Sod Maintenance will be considered included in the lump sum (LS) contract price for Ninety (90) Days Maintenance, and no additional compensation will be made, therefore.

4.03 SOD REPLACEMENT

Payment for Replacement of Damaged Sod during the course of construction or during the maintenance period will be considered included in the lump sum (LS) contract price for ninety (90) days maintenance as set forth in the bid schedule and no additional compensation will be made therefore.

END OF SECTION

Page 231 of 325 ends

SECTION 32 93 95 – MAINTENANCE PERIOD - 1
SECTION 32 93 95 – MAINTENANCE PERIOD

PART 1 GENERAL

1.01 SUMMARY

A. The General Provisions shall apply to all Continuous maintenance of plant material during and after the maintenance period. Provide all labor, materials, tools, transportation, equipment, and incidentals necessary to perform work as indicated on the Plans and as herein specified.

B. Related Sections.

Section 32 80 00: Irrigation
Section 32 93 23: Sodding
Section 32 93 43: Trees

C. The Standard Specifications for Public Works Construction, “Greenbook”, latest edition, is referenced as if herein contained and the Contractor shall keep a copy at the project site. These Specifications shall supersede conflicts with information given in the “Greenbook”, unless otherwise determined by the City.

D. Defin
itions.

1. City: City of Baldwin Park

2. Engineer: City En gineer, or the City Engineer’s designated representative.

3. ASTM: American Society of Testing Materials

E. All vendors, suppliers, and manufacturer’s representatives and the associated addresses, phone, and fax numbers on the Plans and in the Specifications are listed for convenience only. They are subject to change and their inclusion in no way constitutes an endorsement by the City.

1.02 SUBMITTALS

A. Closeout Submit tals: Furnish reproducible mylar prints and microfiche negatives of project record drawings and digital files in a format acceptable to the Owner, after review by the City Engineer, and one month prior to the end of the maintenance period.

1.03 QUALITY ASSURANCE

A. Qualifications: Demonstrate experience in horticulture and landscape maintenance, practices, and techniques. Provide sufficient number of workers with adequate equipment to perform the work during the maintenance period.

Page 232 of 325 ends

SECTION 32 93 95 – MAINTENANCE PERIOD - 2

1.04 MAINTENANCE

A. Maintenance Service: After landscape planting and irrigation work have been completed, reviewed, and accepted by the City planner, provide maintenance of planted areas by means of watering, weeding, rolling, pruning, mowing, re- seeding, cultivating, spraying, mulching, trimming, edging, and other operations necessary for care and upkeep for a period of ninety (90) calendar days after “Date of Acceptance of Installation”.

B. Construction fencing shall remain until after the maintenance period is complete or as directed by the Engineer.

PART 2 PRODUCTS

2.01 MATERIALS

A. Provide materials used in conjunction with the maint enance work in accordance with the requirements of Sections 32 80 00, Section 32 93 23, and Section 32 93

43. PART 3 EXECUTION

3.01 FE RTILIZING

A. Apply an application of Gro- Power Premium Hi-Nitrogen 18-3-7: consisting of the following percent’s bye weight: 14-nitrogen, 4-phosphoric acid, 9-potash, 3- sulfur, 30-humus, 6-humic acids, or equal, commercial fertilizer at the rate of 8 pounds per 1,000 square feet 30 days after planting.

1. Repeat fertilizer application at 45- to 60-day intervals until the end of the maintenance period.

3.02 LANDSCAPE PLANTING MAINTENANCE

A. Provide maintenance of new planting consisting of watering, cultivating, applying pre-emergence weed control, weeding, mulching, re-staking, pruning, tightening, and repairing of guys, resetting plants to proper grades or upright position, restoration of planting saucers, and furnishing and applying such sprays and invigorants as are necessary to maintain the plants free of insects and disease and in thriving condition.

B. Irrigate planting ar eas as required to ensure active growth. Maintain planting areas in a moist, but not saturated, condition. Regulate irrigation as necessary to avoid erosion and gullying.

Page 233 of 325 ends

SECTION 32 93 95 – MAINTENANCE PERIOD - 3

1. Supplemental hand watering may be required to maintain new and existing planting.

2. When hand watering, use water wand to break the water force.

C. Inspect plants, including turf, for disease or insec t damage weekly. Treat affected material immediately.

1. Remove damaged or diseased growth from trees and shrubs. Treat cuts larger than 1/2-inch in diameter with tree paint.

2. Immediately remove any dead or dying plants not in a vigorous thriving condition. Replacement plants shall be the same species and size as those originally planted.

3. Pruning: Pruning work shall be performed by skilled workman in accordance with standard horticultural pruning practices. Remove from the project all pruned branches and other excess material. Remove and replace plant material excessively pruned, or malformed plants resulting from improper pruning practices at no additional cost to Owner.

a. Trees: Prune trees to select and develop permanent scaffold branches; to eliminate narrow V-shaped branch forks that lack strength; to reduce toppling and wind damage by thinning out crowns; to maintain a natural appearance and to balance crown with roots. Prune only as directed by the City Arborist.

D. Re-stake, tighten, and repair ties. Reset to proper grades or upright position any plants that are not in their proper growing position. Stakes shall remain in place through the guaranty period. Readjust tree ties to prevent rubbing.

E. Weeding: Keep plant basins and. areas between plants free of weeds. Control weeds with pre-emergent herbicides. If weeds develop, use legally approved herbicides. Avoid frequent soil cultivation that may destroy shallow roots. Weed paved areas including public or private sidewalks.

F. Insect, Animal, Rodent, and Disease Control: C ontrol with legally approved materials as required.

G. Protection: Maintain protection of the planted areas. Damaged areas shall be repaired or replaced at the Contractor's expense.

H. Trash: Remove trash weekly in all planted areas, pedestrian walkways, patios, and plazas.

Page 234 of 325 ends

SECTION 32 93 95 – MAINTENANCE PERIOD - 4
I. If it becomes evident that certain turf areas and groundcovers have not established uniformly or properly, replant the areas immediately with the same plants and quantity as specified to achieve 90 percent coverage of healthy, actively growing turf and groundcovers for acceptance at Final Review.

J. Wash all trees weekly and immediately after rain, or as directed by City Engineer, to remove dust, dirt, and salt build-up on foliage. Trees shall be washed at a time that is appropriate to the specific species of tree.

3.03 SOD MAINTENANCE

A. Maintenance period will be a minimum of ninety (90) days after Date of Acceptance by the City of all sod installation.

B. M aintenance includes:

1. Water, weed, fertilize, mow, edge, and spray as necessary to promote a healthy growing condition. Keep project neat and attractive throughout the maintenance period.

2. Applying herbicides for weed control, as needed, or directed by City Engineer, in accordance with manufacturer’s instructions. Remedy damage resulting from the use of herbicides.

3. Exterminate rodents and insects as required.

4. Adjust irrigation system scheduling to sufficiently saturate root zone.

5. Repair or replace any damaged item caused by vehicles, vandals, bicycles, or foot traffic during the maintenance period.

6. (During growing season) fertilize turf every four weeks with one pound of nitrogen per 1,000 square feet in a complete fertilizer product (4-1-4 ratio).

C. Maintenance period may be extended if turfgrass and other plant material is not in a healthy growing condition. When all maintenance work has been completed to the satisfaction of the Engineer, the Contractor will be released through written notification by the Engineer.

D. Mow turf a minimum of two (2) times a week with th e first mowing to be completed within the first ten (10) days after installation of sod. Maintain a mowing height of 2” inches. Do not cut more than 1/3 of grass blade at anyone mowing. Grass shall be mowed with a sharp power-driven reel or rotary mower.

Clippings shall be collected and removed.

Page 235 of 325 ends

SECTION 32 93 95 – MAINTENANCE PERIOD - 5

3.04 IRRIGATION SYSTEM MAINTENANCE

A. Provide maintenance of irrigation system consisting of cleaning nozzles, servicing valves, setting controller programs, and other activities required during the landscape maintenance period.

B. System Observation: Check systems for proper operation. Lateral lines shall be flushed out after removing the last sprinkler head or two at each end of the lateral.

All heads are to be adjusted as necessary for unimpeded coverage.

C. Controllers: Set and program automatic controllers for seasonal water requirements. Give the Owner's representative Instruction on how to turn off system in case of emergency.

D. Repairs: Repair all damages to Irrigation system at the Contractor's expense.

Repairs shall be made within 24 hours.

E. All Irrigation heads shall be adjusted to provide 100 percent coverage (head -to- head) with minimal overspray onto hardscape or paving.

3.05 FINAL REVIEW

A. Conduct Final Review at the completion of the formal maintenance period.

B. Submit a written request for review to the City Engineer 10 working days before the completion of work in order that a mutually agreeable time for review may be arranged.

C. The Architect, Contractor, Owner, and others as the City Engineer will direct, shall be present at the Final Review.

D. If, after the review, the City Engineer accepts that the work has been performed in accordance with the Contract Drawings and Specifications, and that plant materials are in satisfactory growing condition, and the irrigation system is in operating order, the City Engineer will issue written notice of final acceptance and end of the formal maintenance period.

E. Work requiring corrective action or replacement in the judgment of the City Engineer shall be performed within 10 days after the Final Review. Perform corrective work and replace materials in accordance with the Contract Drawings and Specifications.

Page 236 of 325 ends

SECTION 32 93 95 – MAINTENANCE PERIOD - 6

3.06 CLEANING

A. Maintain planted areas free of debris. Cultivate and weed at intervals of not more than 14 calendar days.

B. Wash down walks and paving areas, only, with high pressure hose at intervals of not more than 7 calendar days.

C. Upon completion of the ma intenance period leave landscaped areas clean and free of debris and weeds.

3.07 PROTECTION

A. Protect planting areas and plants against damage for duration of maintenance period. Maintenance includes temporary protection fences, barriers, and signs as required for protection. If plants become damaged or injured, treat or replace as directed by City Engineer.

PART 4 PAYMENT

4.01 MAINTENANCE (90 DAYS)

Payment for Maintenance (90 Days) shall be made at the lump sum (LS) contract price as set forth in the bid schedule.

END OF SECTION

Page 237 of 325 ends
Page 238 of 325 ends
Page 239 of 325 ends
Page 240 of 325 ends
Page 241 of 325 ends
Page 242 of 325 ends

Soil Analyses Plant Analyses Water Analyses

WALLACE LABORATORIES, LLC
365 Coral Circle
El
Segundo, CA 90245
phone (310) 615-0116 fax (310) 640-6863

Febr
uary 28, 2025

Bossuet Esquinca, [email protected]
Zusser Company
528 Palisades Drive, #504
Los Angeles, CA 90272

RE: Barnes Park
Two samples received Feb. 26, 2025

Dear Bossuet,

#1 Park Field Area, 10"

The pH is highly alkaline at 8.46. Salinity is moderate at 0.88 millimho/cm.

Nitrogen, potassium, boron and magnesium are moderate. Phosphorus and sulfur are modest. Iron, manganese, zinc and copper are high. Sodium is modest. SAR (sodium adsorption ratio) is 2.7. Aluminum is moderate. Plant-available lead is moderate.

Aluminum restricts growth by interfering with the metabolism of phosphorus and calcium. It causes stunting and discoloration. Foliage may turn a dull gray green.

Aluminum is high in poorly aerated soil and in overly acidic soils. Soluble calcium helps to reduce the toxicity of aluminum.

#2 Park Field Area, 30"

The pH is highly alkaline at 8.42. Salinity is modest at 0.40 millimho/cm.

Nitrogen, phosphorus, magnesium and potassium are modest. Sulfur is low. Manganese, zinc and boron are moderate. Iron and copper are high. Sodium is low. SAR is 1.1.

Aluminum is moderate. The concentrations of common non-essential heavy metals are low.

Recommendations

General soil preparation on a square foot basis for 10” soil. Broadcast the following uniformly; rates are per 1,000 square feet for a 6-inch lift. Incorporate them homogeneously 6" deep.

Potassium sulfate (0-0-50) – 8 pounds
Triple superphosphate (0-45-0) – 4 pounds
Agricultural gypsum - 10 pounds
Organic soil amendment - about 4 cubic yards, sufficient for 4% to 6% soil organic matter

Page 243 of 325 ends

Continuation, February 28, 2025, page 2

Soil Analyses Plant Analyses Water Analyses

For
the preparation on a volume basis for 30” soil, homogeneously blend the following materials into the soil. Rates are expressed per cubic yard:

K-Mag or Diamond K KMS (sul po mag) (0-0-22) – 1/2 pound Triple superphosphate (0-45-0) – 1/4 pound
Agricultural gypsum – 1/2 pound
Organic soil amendment - about 20% by volume, sufficient for 3% to 5% soil organic matter

Organic soil amendment:

1. Humus material shall have an acid-soluble ash content of no less than 6% and no more than 20%. Organic matter shall be at least 50% on a dry weight basis.

2. The pH of the material shall be between 6 and 7.5.

3. The salt content shall be less than 10 millimho/cm @ 25° C. on a saturated paste extract.

4. Boron content of the saturated extract shall be less than 1.0 part per million.

5. Silicon content (acid-insoluble ash) shall be less than 50%.

6. Calcium carbonate shall not be present if to be applied on alkaline soils.

7. Types of acceptable products are composts, manures, mushroom composts, straw, alfalfa, peat mosses etc. low in salts, low in heavy metals, free from weed seeds, free of pathogens and other deleterious materials.

8. Composted wood products are conditionally acceptable [stable humus must be present]. Wood based products are not acceptable which are based on red wood or cedar.

9. Sludge-based materials are not acceptable.

10. Carbon:nitrogen ratio is less than 25:1.

11. The compost shall be aerobic without malodorous presence of decomposition products.

12. The maximum particle size shall be 0.5 inch, 80% or more shall pass a No. 4 screen for soil amending.

Maximum total permissible pollutant concentrations in amendment in parts per million on a dry weight basis:

arsenic 12 copper 100 selenium 10
cadmium 15 lead 150 silver 10
chromium 200 mercury 10 vanadium 50
cobalt 50 molybdenum 20 zinc 250
nickel 100

Higher amounts of salinity or boron may be present if the soils are to be preleached to reduce the excess or if the plant species will tolerate the salinity and/or boron.

Page 244 of 325 ends

Continuation, February 28, 2025, page 3

Soil Analyses Plant Analyses Water Analyses

Irr
igate deeply after amending the soil. Lower the pH to less than 8.0. Afterwards, apply ammonium sulfate (21-0-0) at 5 pounds per 1,000 square feet.

For maintenance fertilization, apply ammonium sulfate (21-0-0) at 5 pounds per 1,000 square feet about once per quarter.

Monitor the site with periodic soil and leaf tissue testing. Adjust the maintenance program as needed.

Sincerely,

Garn A. Wallace, Ph. D.

GAW:n

Page 245 of 325 ends

WALLACE LABS SOILS REPORT Print Date Feb. 27, 2025 Receive Date 2/26/25 365 Coral Circle Location Barnes Park
El Segundo, CA 90245 Requester Bossuet Esquinca, Zusser Company (310) 615-0116 graphic interpretation: * very low, ** low, *** moderate ammonium bicarbonate/DTPA * * * * high, * * * * * very high extractable - mg/kg soil Sample ID Number 25-58-29 25-58-30 Interpretation of data Sample Description #1 Park Field Area, 10" #2 Park Field Area, 30" low medium high elements graphic graphic
0 - 7 8-15 over 15 phosphorus 6.51 ** 3.24 ** 0-60 60 -120 121-180 potassium 70.09 *** 38.58 ** 0 - 4 4 - 10 over 10 iron 31.61 ***** 17.75 ***** 0- 0.5 0.6- 1 over 1 manganese 3.17 **** 0.90 *** 0 - 1 1 - 1.5 over 1.5 zinc 6.93 **** 1.41 *** 0- 0.2 0.3- 0.5 over 0.5 copper 2.60 **** 1.25 **** 0- 0.2 0.2- 0.5 over 1 boron 0.46 *** 0.23 *** calcium 491.41 **** 414.07 **** magnesium 60.25 *** 37.19 ** sodium 71.95 ** 21.10 * sulfur 29.03 ** 7.87 * molybdenum 0.05 *** 0.03 *** nickel 0.20 * 0.06 * The following trace aluminum 2.09 *** 1.09 *** elements may be toxic arsenic 0.17 * 0.18 * The degree of toxicity barium 1.84 * 2.85 * depends upon the pH of cadmium 0.05 * 0.01 * the soil, soil texture, chromium n d * n d *
organic matter, and the cobalt 0.03 * 0.02 * concentrations of the lead 5.74 *** 1.47 ** individual elements as well lithium 0.22 * 0.18 * as to their interactions mercury n d * n d *
selenium n d
* n d *
The pH optimum depends silver n d * n d *
upon soil organic strontium 3.06 * 2.74 * matter and clay content- tin n d * n d *
for clay and loam soils: vanadium 0.26 * 0.09 * under 5.2 is too acidic

6.5 to 7 is ideal Saturation Extract
over 8.0 is too alkaline pH value 8.46 **** 8.42 ****
The ECe is a measure of ECe (milli- 0.88 *** 0.40 **
the soil salinity: mho/cm) millieq/l millieq/l
1-2 affects a few plants calcium 70.5 3.5 40.3 2.0
2-4 affects some plants, magnesium 12.5 1.0 8.9 0.7
> 4 affects many plants. sodium 92.6 4.0 29.6 1.3
potassium 16.5 0.4 5.4 0.1
cation sum 9.0 4.2
problems over 150 ppm chloride 44 1.2 38 1.1
good 20 - 30 ppm nitrate as N 33 2.3 12 0.9
phosphorus as P 0.0 0.0 0.0 0.0
toxic over 800 sulfate as S 44.3 2.8 17.3 1.1
anion sum 6.3 3.0
toxic over 1 for many plants boron as B 0.08 * 0.07 *
increasing problems start at 3 SAR 2.7 ** 1.1 *
est. gypsum requirement-lbs./1000 sq. ft. 12 4
relative infiltration rate fair/slow fair/slow
estimated soil texture sandy loam sandy loam
lime (calcium carbonate) no no
organic matter fair/low low/fair
moisture content of soil 8.8% 6.9%
half saturation percentage 14.5% 13.9%
Elements are expressed as mg/kg dry soil or mg/l for saturation extract. pH and ECe are measured in a saturation paste extract. nd means not detected.

Analytical data determined on soil fraction passing a 2 mm sieve.

Page 246 of 325 ends

CITY OF BALDWIN PARK

DEPARTMENT OF PUBLIC WORKS

BARNES PARK MULTI-BENEFIT

STORMWATER CAPTURE PROJECT
113

VICINITY MAP
1 5

CITY COUNCIL

BARNES PARK MULTI-BENEFIT

STORMWATER CAPTURE PROJECT AT

BARNES PARK, BALDWIN PARK, CA
(3251 PATRITTI AVENUE)

SHEET INDEX
DWG NO. SHEET NO. SHEET TITLE
CIVIL

EROSION CONTROL

LANDSCAPE

ARCHITECTURE

ELECTRICAL
1 T.01

GENERAL NOTES
NPDES NOTES:

IMPORTANT NOTICE
PROJECT NO. CIP 21-1
8 COUNTY OF LOS ANGELES, CALIFORNIA

CITY OF BALDWIN PARK

DEPARTMENT OF PUBLIC WORKS

BENCHMARK

BASIS OF BEARING
113

COORDINATE DATUM

IMPORT (FILL)

EXPORT (CUT)

TOTAL EXPORT
1,2 CY
1  CY
EARTHWORK 4UANTITIES
1,1 CY
TOTAL DISTURBED AREA 5.5 AC

Page 247 of 325 ends

PATRITTI AVENUE
90186||01|#90186||01|#80612||01|#80612||01|#

CITY OF BALDWIN PARK

DEPARTMENT OF PUBLIC WORKS

IMPORTANT NOTICE

BARNES PARK MULTI-BENEFIT

STORMWATER CAPTURE PROJECT
113
MATCH LINE - SEE SHEET C.06
8 MATCH LINE - SEE SHEET C.08
C.07
STRIPING NOTES:

CONSTRUCTION NOTES:

NOTES:

DOMESTIC WATER NOTES:

LEGEND:

STORM DRAIN NOTES:

ADA AREA ENLARGED VIEW:

P.O.T. NOTES:

PARKING STALL COUNT
REGULAR STALLS ADDED = 92
ADA STALLS ADDED = 4
TOTAL STALLS ADDED = 96

Page 248 of 325 ends

AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) A36 1.5"
R

41.1 0.42
40 4,893HZ3
A37 1.5"
R

41.1 1.64
40 4,893HZ3
A33 1.5"
R

41.1 0.82
40 4,893HZ3
A32 1.5"
R

27.4 1.64
40 3,262HZ3
A35 1.5"
R

27.4 0.42
40 3,262HZ3
A34 1.5"
R

27.4 0.82
40 3,262HZ3
A52 1"
DT

9.3 0.79
30 1,118HZ1
930'
TUBING
A45 1"
DT

14.9 0.79
30 1,801HZ1
1,490'
TUBING
A50 1"
DT

12.1 0.79
30 1,462HZ1
1,210'
TUBING
A53 1"
TB
10 1.50
30 N/AHZ4
A47 1"
DT

12.7 0.79
30 1,270HZ2
1,910'
TUBING
A46 1.5"
MPR
24 0.45
40 2,924HZ3
A31 1"
DT

14.6 0.79
30 1,757HZ1
1,460'
TUBING
A49 1"
TB
16 1.50
30 N/AHZ4
A48 1"
TB
2 1.50
30 N/AHZ4
A38 1"
TB
20 1.50
30 N/AHZ4
A51 1"
DT

16.9 0.79
30 2,040HZ1
1,690'
TUBING
1"
3/4"
3/4" 3/4"
3/4"
3/4"
11/4"
3/4"
1"
1"
3/4"
3/4"
11/2"
3/4"
1"
3/4"1"
3/4"
3/4"
3/4"
3/4"
1"
11/4"
1"
3/4"
3/4"
11/4"
11/4"
1"
1"
1"
1"
11/4"
11/4"
2"
2" 2"
3"
3"
3"
3"
3"
3"
3"
11/4"
3/4"
3/4"
3/4"
1"
11/4"
1"
3/4"
2"
2"
11/2"
11/2"
2"
11/2"
1"
3/4"
1"
3/4"
3/4"
1"
3/4"
3/4"
3/4"
11/4" 11/4"
11/4"
11/2"
2"
1"1"
11/4"
1"
1"1"
1"
18 18
18 18
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F

CITY OF BALDWIN PARK

DEPARTMENT OF PUBLIC WORKS

IMPORTANT NOTICE

BARNES PARK MULTI-BENEFIT

STORMWATER CAPTURE PROJECT

IRRIGATION PLAN

PATRITTI AVENUE
TORCH
STREET
605 FREEWAY
Scale: 1" = 20'-0"
40'10' 20'0 5'
North
Match Line 'A', See Sheet LI.2

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND

APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE

IRRIGATION DESIGN PLAN
NOTE A:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR CLARITY ONLY. THE ACTUAL LOCATION

OF MAINLINE AND RELATED IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES, TYPICAL.

NOTE B:

CONTRACTOR SHALL ADJUST ALL HEADS AS REQUIRED TO ACCOMMODATE ANY

VERTICAL OBSTRUCTIONS THAT MAY OCCUR IN THE LANDSCAPE, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, TREES, ETC. WHEN A SLIGHT RELOCATION

OF THE HEAD IS NOT SUFFICIENT TO CLEAR THE OBSTACLE, OR IF IT NEGATIVELY

AFFECTS THE COVERAGE, AN ADDITIONAL HEAD SHALL BE INSTALLED TO PLACE ONE HEAD ON EITHER SIDE OF THE OBSTACLE. THE NOZZLES OF THESE TWO HEADS SHALL

HAVE ARC PATTERNS THAT ADD UP TO THE ORIGINAL ARC PATTERN OF THE HEAD INDICATED ON THE PLANS. THE CONTRACTOR SHALL VERIFY ALL HEAD LAYOUT WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE C:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL LINES ARE SHOWN

WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE. THE

CONTRACTOR SHALL CONFIRM ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE D:

CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING WITHIN THE DRIPLINE OF EXISTING TREES. NO MECHANICAL TRENCHING WITHIN THE DRIPLINE OF THE EXISTING TREE WILL BE ALLOWED. AIR SPADE SHALL BE UTILIZED FOR ALL TRENCHING WITHIN THE DRIPLINE OF TREES. VERIFY ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE.

NOTE E:

IRRIGATION PLANS SHALL COMPLY WITH CITY OF BALDWIN PARK'S SUB CHAPTER 153.160 WATER EFFICIENT LANDSCAPING STANDARD
LI.1
50 113

Page 249 of 325 ends

305
304
303
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130) AeccDbStructure (AeccNetwork130) AeccDbStructure (AeccNetwork130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130)
AeccDbStructure (AeccNetwork130) AeccDbStructure (AeccNetwork130) AeccDbStructure (AeccNetwork130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)
AeccDbCogoPoint (AeccLand130)AeccDbCogoPoint (AeccLand130) AeccDbCogoPoint (AeccLand130)
A25 1.5"
R

27.4 0.82
40 3,262HZ3
A26 1.5"
R

41.1 1.64
40 4,841HZ3
A27 1.5"
R

41.1 0.82
40 4,893HZ3
A41 1.5"
R

41.1 1.64
40 4,893HZ3
A40 1.5"
R

41.1 0.82
40 4,893HZ3
A43 1.5"
R

41.1 0.42
40 4,893HZ3
A42 1.5"
R

41.1 0.42
40 4,893HZ3
A39 1.5"
R

41.1 0.42
40 4,893HZ3
A44 1"
DT

5.3 0.79
30 634HZ1
530'
TUBING
A24 1"
DT

7.4 0.79
30 890HZ2
740'
TUBING
A29 1"
DT

15.1 0.79
30 1,829HZ2
1,510'
TUBING
A30 1.5"
MPR
28 0.45
40 3,575HZ3
A21 1.5"
DT

21.3 0.79
30 2,579HZ2
2,130'
TUBING
A22 1"
TB
18 1.50
30 N/AHZ4
A20 1"
DT

16.0 0.79
30 1,927HZ1
1,600'
TUBING
A23 1"
DT

7.3 0.79
30 876HZ1
730'
TUBING
2"
11/4"11/4"
11/2"
2"11/4" 11/4"
2"
11/2" 11/4"
11/4"
2"
11/2"
11/4"
11/4"
11/2"
2"
2"
11/4"
11/2"
11/4"
11/2"
11/4"
11/4"
2"
11/4"
11/2"
11/4"
11/4"
11/4"11/2"
2"
11/4"
11/2"
11/4"
2"
11/2"
11/4"
2"
11/4" 11/4"
11/4"
11/2"
11/4"
11/4"
11/2"
1"
1"
11/2"
1"
3/4"
11/4"3/4"
3/4"
1"
1"
1"
11/4"
3/4"
3/4"
1"
11/4"
11/4"
3" 3"
3"
3"3"3" 3"
A28 1"
TB
8 1.50
30 N/AHZ4
3/4"
3/4"
3/4"
3/4"
1"
3/4"
3/4"
1"
11/4"
1"
1" 11/4"
1"
1"
1"
1"
3/4"
3/4"
3/4"
1"
1"
3/4"
3/4"
3/4" 3/4" 1" 1"
1" 1"
1"
3/4"
1"
3/4"
18 18
18 1818
18 18
18 18
18 18
18 18
18 18
18 18
18 18
18 181818
18 18
18 18
18 18
18181818
18 18
F
F
F
F
F FF
F
F
F
F
F
F
F
F
F
F
F
F
F

CITY OF BALDWIN PARK

DEPARTMENT OF PUBLIC WORKS

IMPORTANT NOTICE

BARNES PARK MULTI-BENEFIT

STORMWATER CAPTURE PROJECT

PATRITTI AVENUE
605 FREEWAY
Scale: 1" = 20'-0"
40'10' 20'0 5'
Match Line 'B', See Sheet LI.3
Match Line 'A', See Sheet LI.1

IRRIGATION PLAN
REFER TO SHEET LI.4 FOR IRRIGATION LEGEND & NOTES
REFER TO SHEETS LI.5 TO LI.7 FOR IRRIGATION DETAILS
North

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND

APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE

IRRIGATION DESIGN PLAN
NOTE A:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED

IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR
CLARITY ONLY. THE ACTUAL LOCATION OF MAINLINE AND RELATED

IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES,
TYPICAL.

NOTE B:

CONTRACTOR SHALL ADJUST ALL HEADS AS REQUIRED TO

ACCOMMODATE ANY VERTICAL OBSTRUCTIONS THAT MAY OCCUR IN

THE LANDSCAPE, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, TREES, ETC. WHEN A SLIGHT RELOCATION OF THE

HEAD IS NOT SUFFICIENT TO CLEAR THE OBSTACLE, OR IF IT

NEGATIVELY AFFECTS THE COVERAGE, AN ADDITIONAL HEAD SHALL

BE INSTALLED TO PLACE ONE HEAD ON EITHER SIDE OF THE
OBSTACLE. THE NOZZLES OF THESE TWO HEADS SHALL HAVE ARC

PATTERNS THAT ADD UP TO THE ORIGINAL ARC PATTERN OF THE HEAD INDICATED ON THE PLANS. THE CONTRACTOR SHALL VERIFY

ALL HEAD LAYOUT WITH OWNER'S AUTHORIZED REPRESENTATIVE
PRIOR TO STARTING WORK.

NOTE C:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL

LINES ARE SHOWN WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE

BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE

PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED
REPRESENTATIVE. THE CONTRACTOR SHALL CONFIRM ALL LAYOUT

IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE D:

CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING
WITHIN THE DRIPLINE OF EXISTING TREES. NO MECHANICAL

TRENCHING WITHIN THE DRIPLINE OF THE EXISTING TREE WILL BE ALLOWED. AIR SPADE SHALL BE UTILIZED FOR ALL TRENCHING WITHIN THE DRIPLINE OF TREES. VERIFY ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE.

NOTE E:

IRRIGATION PLANS SHALL COMPLY WITH CITY OF BALDWIN PARK'S SUB CHAPTER 153.160 WATER EFFICIENT LANDSCAPING STANDARD LI.2
51 113

Page 250 of 325 ends

A17 1"
TB
7 1.50
30 N/AHZ4
A18 1"
DT

11.7 0.79
30 1,414HZ2
1,170'
TUBING
A11 1"
DT

15.5 0.79
30 1,871HZ1
1,550'
TUBING
A10 1"
TB
7 1.50
30 N/AHZ4
A12 1"
TB

4.5 1.50
30 N/AHZ4
A15 1"
DT

16.6 0.79
30 2,004HZ2
1,660'
TUBING
A16 1"
TB
14 1.50
30 N/AHZ4
A14 1"
DT

6.6 0.79
30 797HZ1
A13 1.5"
MPR

25.1 0.45
40 3,324HZ2
A8 1"
DT

15.4 0.79
30 1,864HZ1
1,540'
TUBING
A9 1"
S

10.8 1.75
30 392HZ2
A7 1"
TB
10 1.50
30 N/AHZ4
A6 1"
DT

17.9 0.79
30 2,168HZ1
1,790
TUBING
A4 1"
DT

11.5 0.79
30 1,393HZ2
1,150'
TUBING
A5 1.5"
S
26 1.75
30 1,085HZ2A3 1"
TB
5 1.50
30 N/AHZ4
A2 1"
MPR
3 0.45
40 661HZ1
A1 1"
DT

11.1 0.79
30 1,340HZ2
1,110'
TUBING
3/4"
3/4"
1"
3/4"
11/4"
1"
2" 11/4"
3/4"
3/4"
3/4"
11/4"
3/4"
3/4"
1"
3/4"
3/4"
1"
3/4" 3/4"
3/4"3/4"
1"
1"
11/2"
1"
3/4"
3/4" 11/4"
3/4"
3/4"1"
3/4"3/4"
3"
2" 2"
2"
2"
3" 3"
3"
3"
3"
660'
TUBING
A19 1"
DT

14.7 0.79
30 1,774HZ1
1,470'
TUBING
11/4"
11/4"
3/4"3/4"
3/4"3/4"
3/4"
1"
1"
1"
11/4" 1"
1"
1"
1"
11/4"
1"
1"
1"
3/4"
3/4"
1"
1"
3/4"
3/4" 3/4"
11/4"1"
1"
1"
1"
1"
1"
1"
1"
1"
1"
11/4"
11/4"1"
3/4"
3/4"
3/4"
3/4"
1"
3/4"
3/4"
1"
1"
11/4"
11/4"
11/4"
1"
1"1"
11/4"
1"
1"
1"
11/4"
3/4"
3/4"
3/4"1"
1"
1"
11/4"
1"
3/4"
1"
1" 11/4" 3/4"
3/4"
F
F
F
F
F
F
F
F
FF
FF
F
F
F
F
F
F
F
F
F
F
F
F
F
C
R
E
F
F FF
F
3" MBF V
3/4"

CITY OF BALDWIN PARK

DEPARTMENT OF PUBLIC WORKS

IMPORTANT NOTICE

BARNES PARK MULTI-BENEFIT

STORMWATER CAPTURE PROJECT

PATRITTI AVENUE
BESS
AVENUE
Scale: 1" = 20'-0"
40'10' 20'0 5'
Match Line 'B', See Sheet LI.2

IRRIGATION PLAN
North
605 FREEWAY
NOTE A:

POINT OF CONNECTION (POC) #1 SHALL BE DOWNSTREAM OF TWO (2) EXISTING 2" DOMESTIC WATER METERS. THE CONTRACTOR SHALL VERIFY THE ACTUAL LOCATION,

WATER TYPE, METER SIZE AND WATER PRESSURE IN THE FIELD PRIOR TO STARTING WORK. MEASUREMENT OF THE STATIC (NO WATER MOVING) WATER PRESSURE IS

ACCEPTABLE FOR POTABLE WATER SYSTEMS WHERE NO PUMP HAS BEEN INDICATED ON THESE PLANS. WHEN USING RECYCLED WATER, OR ON POTABLE WATER SYSTEMS

REQUIRING A PUMP, ONLY THE MEASUREMENT OF DYNAMIC (WATER MOVING THROUGH THE METER) WATER PRESSURE, SHALL BE ACCEPTABLE. THE DYNAMIC WATER

PRESSURE SHALL BE MEASURED AT THE MAXIMUM SYSTEM DEMAND AS INDICATED BELOW. IF ANY OF THE POC INFORMATION SHOWN ON THESE DRAWING IS FOUND TO BE

DIFFERENT THAN THE ACTUAL POC INFORMATION GATHERED IN THE FIELD, IMMEDIATELY NOTIFY THE LANDSCAPE ARCHITECT AND IRRIGATION CONSULTANT.

SHOULD THE CONTRACTOR FAIL TO VERIFY THE POC INFORMATION AS SHOWN HEREIN,

ANY CHANGES REQUIRED BY LOW PRESSURE OR VOLUME SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

WATER PRESSURE AT POC: 78 PSI (STATIC)
DESIGN WATER PRESSURE: 66.4 PSI
MAXIMUM SYSTEM DEMAND: 41.1 GPM
PRESSURE BOOST REQUIRED: N/A PSI
RESIDUAL WATER PRESSURE: 11.6 PSI
NOTE B:

CONTROLLER "A" SHALL BE OF THE BRAND, MODEL AND STATION SIZE AS INDICATED ON THE IRRIGATION MATERIALS LEGEND. THE CONTROLLER SHALL BE INSTALLED IN THE APPROXIMATE LOCATION SHOWN. THE CONTRACTOR SHALL COORDINATE THE

REQUIRED ELECTRICAL POWER SUPPLY AT THIS LOCATION WITH THE OWNER'S AUTHORIZED REPRESENTATIVE. FINAL LOCATION OF CONTROLLER AND ELECTRICAL

POINT OF CONNECTION SHALL BE CONFIRMED WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE C:

THESE PLANS ARE DIAGRAMMATIC, THE MAINLINE AND RELATED IRRIGATION EQUIPMENT IS SHOWN WITHIN THE PAVING FOR CLARITY ONLY. THE ACTUAL LOCATION

OF MAINLINE AND RELATED IRRIGATION EQUIPMENT SHALL BE WITHIN PLANTER AND A MINIMUM OF 18" OFF ADJACENT HARDSCAPE AND OTHER OBSTACLES, TYPICAL.

NOTE D:

CONTRACTOR SHALL ADJUST ALL HEADS AS REQUIRED TO ACCOMMODATE ANY

VERTICAL OBSTRUCTIONS THAT MAY OCCUR IN THE LANDSCAPE, INCLUDING BUT NOT LIMITED TO LIGHT POLES, FIRE HYDRANTS, TREES, ETC. WHEN A SLIGHT RELOCATION

OF THE HEAD IS NOT SUFFICIENT TO CLEAR THE OBSTACLE, OR IF IT NEGATIVELY

AFFECTS THE COVERAGE, AN ADDITIONAL HEAD SHALL BE INSTALLED TO PLACE ONE HEAD ON EITHER SIDE OF THE OBSTACLE. THE NOZZLES OF THESE TWO HEADS SHALL

HAVE ARC PATTERNS THAT ADD UP TO THE ORIGINAL ARC PATTERN OF THE HEAD INDICATED ON THE PLANS. THE CONTRACTOR SHALL VERIFY ALL HEAD LAYOUT WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE E:

THESE PLANS ARE DIAGRAMMATIC, TREE BUBBLERS AND LATERAL LINES ARE SHOWN

WITHIN THE PAVING FOR CLARITY ONLY, THE ACTUAL LOCATIONS SHALL BE WITHIN THE PLANTER. THE TREE BUBBLERS SHALL BE ALIGNED WITH TREES AS SHOWN ON THE PLANTING PLANS, AND AS DIRECTED BY OWNER'S AUTHORIZED REPRESENTATIVE. THE

CONTRACTOR SHALL CONFIRM ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE PRIOR TO STARTING WORK.

NOTE F:

CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING WITHIN THE DRIPLINE OF EXISTING TREES. NO MECHANICAL TRENCHING WITHIN THE DRIPLINE OF THE EXISTING TREE WILL BE ALLOWED. AIR SPADE SHALL BE UTILIZED FOR ALL TRENCHING WITHIN THE DRIPLINE OF TREES. VERIFY ALL LAYOUT IN FIELD WITH OWNER'S AUTHORIZED REPRESENTATIVE.

NOTE G:

IRRIGATION PLANS SHALL COMPLY WITH CITY OF BALDWIN PARK'S SUB CHAPTER 153.160 WATER EFFICIENT LANDSCAPING STANDARD
IRRIGATION POINT OF CONNECTION #1;
REFER TO NOTE "A"
IRRIGATION CONTROLLER "A";
REFER TO NOTE "B"

I HAVE COMPLIED WITH THE CRITERIA OF THE IRRIGATION GUIDELINES AND

APPLIED THEM ACCORDINGLY FOR THE EFFICIENT USE OF WATER IN THE

IRRIGATION DESIGN PLAN
LI.3
52 113

Page 251 of 325 ends
← All documents from this meeting