225
ITEM NO. QTY SIZE DESCRIPTION NET EA. TOTAL
21) 1 4" Model 50-01 / C2 Booster Relief $ 447.00 $ 447.00 Main Valve & Pilot Rubber Rebuild Kit
22) 1 6" Model 60-11 Modified / C3 Booster $ 558.00 $ 558.00 Main Valve & Pilot Rubber Rebuild Kit
23) 1 12" Model 81-02 / C4 Well Check Valve $ 937.00 $ 937.00 Main Valve Rubber Rebuild Kit
24) 2 12" Model 60-46 Modified / C4 Booster Pump Control $ 1,275.00 $ 2,550.00 Main Valve & Pilot Rubber Rebuild Kit
25) 1 10" Model 81-02 / C5 Well Check Valve $ 701.00 $ 701.00 Main Valve Rubber Rebuild Kit
26) 1 10" Model 60-46 Modified / C5 Booster Pump Control $ 1,186.00 $ 1,186.00 Main Valve & Pilot Rubber Rebuild Kit
27) 1 8" Watts Pump Control Valve / C6 Booster $ 820.00 $ 820.00 Main Valve Rubber Rebuild Kit
28) 1 6" Model 50-01 / C6 Booster Relief $ 553.00 $ 553.00 Main Valve & Pilot Rubber Rebuild Kit
29) 1 6" Model 61-02 / M3 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
30) 1 3" Model 52-03 / M3 Surge Anticipator $ 670.00 $ 670.00 Main Valve & Pilot Rubber Rebuild Kit
31) 1 6" Model 61-02 / M10 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
32) 1 3" Model 52-03 / M10 Surge Anticipator $ 670.00 $ 670.00 Main Valve & Pilot Rubber Rebuild Kit
33) 1 6" Model 61-02 / M11 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
34) 1 3" Model 52-03 / M11 Surge Anticipator $ 670.00 $ 670.00 Main Valve & Pilot Rubber Rebuild Kit
35) 1 6" Model 61-02 / M12 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
36) 1 10" Model 790-01 & 58-01 / Well #1 $ 2,003.00 $ 2,003.00 Main Valve & Pilot Rubber Rebuild Kit
37) 1 10" Model 790-01 & 58-01 / Well #4 $ 2,003.00 $ 2,003.00 Main Valve & Pilot Rubber Rebuild Kit
38) 1 8" Model 750-01 / Well #7 $ 736.00 $ 736.00
Main Valve & Pilot Rubber Rebuild Kit
39) 1 8" Model 43-01 / Sun Lakes Beaumont Connection $ 743.00 $ 743.00 Main Valve & Pilot Rubber Rebuild Kit
40) 1 8" Model 131-EJ / H.S. / Beaumont Connection $ 636.00 $ 636.00 Main Valve & Pilot Rubber Rebuild Kit
41) 2 8" Model 131-CW / H.S. / Mtn. to Foothill West $ 646.00 $ 1,292.00 Main Valve & Pilot Rubber Rebuild Kit
42) 2 24" Model 631-01 / Brinton Reservoir $ 1,665.00 $ 3,330.00 Main Valve & Pilot Rubber Rebuild Kit
43) 1 16" Model 210-GL / Southwest Reservoir $ 2,937.00 $ 2,937.00 Main Valve & Pilot Rubber Rebuild Kit
44) 2 20" Model 210-GL / San G Reservoir $ 3,283.00 $ 6,566.00 Main Valve & Pilot Rubber Rebuild Kit
45) 1 6" Model 90-01 / @ Hi Valley Tank Fire Supplement $ 532.00 $ 532.00 Main Valve & Pilot Rubber Rebuild Kit
46) 1 8" Model 750-01 / Banning Heights Roll Seal $ 736.00 $ 736.00
226
ITEM NO. QTY SIZE DESCRIPTION NET EA. TOTAL
Main Valve & Pilot Rubber Rebuild Kit
47) 1 3" Model 50-01 / Lincoln & Woodland $ 950.00 $ 950.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 48) 1 6" Model 90-01 / Lincoln & Woodland $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 49) 1 8" Model 90-01 / Lincoln & Woodland $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 50) 1 3" Model 50-01 / 16th & Hays $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 51) 1 1.5" Model 90-01 / 16th & Hays $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 52) 1 6" Model 90-01 / 16th & Hays $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 53) 1 12" Model 90-01 / 16th & Hays $ 2,525.00 $ 2,525.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 54) 1 3" Model 50-01 / 8th & Jacinto $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 55) 1 1.5" Model 90-01 / 8th & Jacinto $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 56) 1 6" Model 90-01 / 8th & Jacinto $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 57) 1 8" Model 90-01 / 8th & Jacinto $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 58) 1 3" Model 50-01 / 4th & Wilson $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 59) 1 1.5" Model 90-01 / 4th & Wilson $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 60) 1 6" Model 90-01 / 4th & Wilson $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 61) 1 12" Model 90-01 / 4th & Wilson $ 2,525.00 $ 2,525.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 62) 1 2" Model 50-01 / San G & Gilman $ 898.00 $ 898.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 63) 1 1.5" Model 90-01 / San G & Gilman $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 64) 1 4" Model 90-01 / San G & Gilman $ 1,319.00 $ 1,319.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 65) 1 6" Model 90-01 / San G & Gilman $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 66) 1 4" Model 50-01 / Almond & Hoffer $ 1,111.00 $ 1,111.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 67) 1 1.5" Model 90-01 / Almond & Hoffer $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 68) 1 4" Model 90-01 / Almond & Hoffer $ 1,319.00 $ 1,319.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 69) 1 8" Model 90-01 / Almond & Hoffer $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 70) 1 3" Model 50-01 / 8th & George $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 71) 1 1.5" Model 90-01 / 8th & George $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F
227
ITEM NO. QTY SIZE DESCRIPTION NET EA. TOTAL
72) 1 6" Model 90-01 / 8th & George $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 73) 1 8" Model 90-01 / 8th & George $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 74) 1 16" Model 210-17 / Foothill West Reservoir $ 2,591.00 $ 2,591.00 Main Valve & Pilot Rubber Rebuild Kit
75) 252 Labor / Prevailing Wage / 2 Men $ 354.00 $ 89,208.00 76) 64 Travel / 32 Days $ 160.00 $ 10,240.00
TOTAL / WITHOUT TAX $ 186,646.00
NOTES: Main Valve Rebuild Kit Consists of Disc, Diaphragm, & Spacer Washers Any hard parts are extra!!
This quotation is valid for 30 days from the above date.
After 30 days Cla-Val reserves the right to change the pricing due to material cost increases.
All prices are NET
AUTHORIZED BY: SALESPERSON: Mike Trosper
TERRITORY: 3900
QUOTATION EFFECTIVE FOR 30 DAYS FROM See Quote Number
MESSAGES: Quote is for estimating only, Cla-Val Service is billed on an actual time & materials used basis.
If you have any questions regarding this quotation please contact Mike Trosper - Cell (949)-923-0649 24100 Water St. [email protected]
Perris,CA. 92570
P. 951-657-1718 Ext.288 / Fax 951-657-8540
228
Exhibit D -1
11303-0001\2191356v2.doc
EXHIBIT “D”
SCHEDULE OF PERFORMANCE
I. The Contract Officer may approve extensions for performance of the Services in accordance with Section 3.5.
II. All work product is subject to review and acceptance by the City, and must be revised by the Contractor without additional charge to the City until found satisfactory and accepted by City.
229
CLA-VAL CO. WESTERN REGIONAL SERVICE
QUOTATION
QUOTE NUMBER: 110123MT1 DATE: 12/20/2023 PAGE: 1
CUSTOMER: City of Banning
CONTACT: Perry Gerdes
ADDRESS: Banning PHONE: 951-232-9236
JOB NAME: Cla-Val Rebuild FAX:
ITEM NO. QTY SIZE DESCRIPTION NET EA. TOTAL
01) 1 3" Model 50-01 / Hargrave & John St. $ 397.00 $ 397.00 Main Valve & Pilot Rubber Rebuild Kit
02) 1 4" Model 90-01 / Hargrave & John St. $ 430.00 $ 430.00 Main Valve & Pilot Rubber Rebuild Kit
03) 1 6" Model 90-01 / Hargrave & John St. $ 532.00 $ 532.00 Main Valve & Pilot Rubber Rebuild Kit
04) 1 8" Model 90-01 / Hargrave & John St. $ 606.00 $ 606.00 Main Valve & Pilot Rubber Rebuild Kit
05) 1 3" Model 50-01 / San Gorgonio & Lincoln $ 397.00 $ 397.00 Main Valve & Pilot Rubber Rebuild Kit
06) 1 4" Model 90-01 / San Gorgonio & Lincoln $ 532.00 $ 532.00 Main Valve & Pilot Rubber Rebuild Kit
07) 1 8" Model 90-01 / San Gorgonio & Lincoln $ 606.00 $ 606.00 Main Valve & Pilot Rubber Rebuild Kit
08) 1 2" Model 50-01 / San Gorgonio Tank $ 384.00 $ 384.00 Main Valve & Pilot Rubber Rebuild Kit
09) 1 2" Model 90-01 / San Gorgonio Tank $ 374.00 $ 374.00 Main Valve & Pilot Rubber Rebuild Kit
10) 1 6" Model 90-01 / San Gorgonio Tank $ 532.00 $ 532.00 Main Valve & Pilot Rubber Rebuild Kit
11) 1 2" Model 50-01 / Ring of Trees Reg. Station $ 384.00 $ 384.00 Main Valve & Pilot Rubber Rebuild Kit
12) 1 2" Model 90-01 / Ring of Trees Reg. Station $ 374.00 $ 374.00 Main Valve & Pilot Rubber Rebuild Kit
13) 1 6" Model 90-01 / Ring of Trees Reg. Station $ 532.00 $ 532.00 Main Valve & Pilot Rubber Rebuild Kit
14) 1 8" Model 131-01 Modified / K Mart Reg. Station $ 825.00 $ 825.00 Main Valve & Pilot Rubber Rebuild Kit
15) 1 8" Model 81-01 / K Mart Reg. Station $ 632.00 $ 632.00 Main Valve Rebuild Kit
16) 1 6" Model 50-01 / Well #2 $ 553.00 $ 553.00
Main Valve & Pilot Rubber Rebuild Kit
17) 1 8" Model 50-01 / Well #3 $ 627.00 $ 627.00
Main Valve & Pilot Rubber Rebuild Kit
18) 1 4" Model 210-01 / Mountain Tank $ 684.00 $ 684.00 Main Valve & Pilot Rubber Rebuild Kit
19) 1 4" Model 210-09 / Hi Valley Tank $ 948.00 $ 948.00 Main Valve & Pilot Rubber Rebuild Kit
20) 5 4" Model 60-31 / C2 Booster $ 775.00 $ 3,875.00
Main Valve & Pilot Rubber Rebuild Kit
230
21) 1 4" Model 50-01 / C2 Booster Relief $ 447.00 $ 447.00 Main Valve & Pilot Rubber Rebuild Kit
22) 1 6" Model 60-11 Modified / C3 Booster $ 558.00 $ 558.00 Main Valve & Pilot Rubber Rebuild Kit
23) 1 12" Model 81-02 / C4 Well Check Valve $ 937.00 $ 937.00 Main Valve Rubber Rebuild Kit
24) 2 12" Model 60-46 Modified / C4 Booster Pump Control $ 1,275.00 $ 2,550.00 Main Valve & Pilot Rubber Rebuild Kit
25) 1 10" Model 81-02 / C5 Well Check Valve $ 701.00 $ 701.00 Main Valve Rubber Rebuild Kit
26) 1 10" Model 60-46 Modified / C5 Booster Pump Control $ 1,186.00 $ 1,186.00 Main Valve & Pilot Rubber Rebuild Kit
27) 1 8" Watts Pump Control Valve / C6 Booster $ 820.00 $ 820.00 Main Valve Rubber Rebuild Kit
28) 1 6" Model 50-01 / C6 Booster Relief $ 553.00 $ 553.00 Main Valve & Pilot Rubber Rebuild Kit
29) 1 6" Model 61-02 / M3 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
30) 1 3" Model 52-03 / M3 Surge Anticipator $ 670.00 $ 670.00 Main Valve & Pilot Rubber Rebuild Kit
31) 1 6" Model 61-02 / M10 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
32) 1 3" Model 52-03 / M10 Surge Anticipator $ 670.00 $ 670.00 Main Valve & Pilot Rubber Rebuild Kit
33) 1 6" Model 61-02 / M11 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
34) 1 3" Model 52-03 / M11 Surge Anticipator $ 670.00 $ 670.00 Main Valve & Pilot Rubber Rebuild Kit
35) 1 6" Model 61-02 / M12 Pump Control $ 507.00 $ 507.00 Main Valve Rubber Rebuild Kit
36) 1 10" Model 790-01 & 58-01 / Well #1 $ 2,003.00 $ 2,003.00 Main Valve & Pilot Rubber Rebuild Kit
37) 1 10" Model 790-01 & 58-01 / Well #4 $ 2,003.00 $ 2,003.00 Main Valve & Pilot Rubber Rebuild Kit
38) 1 8" Model 750-01 / Well #7 $ 736.00 $ 736.00
Main Valve & Pilot Rubber Rebuild Kit
39) 1 8" Model 43-01 / Sun Lakes Beaumont Connection $ 743.00 $ 743.00 Main Valve & Pilot Rubber Rebuild Kit
40) 1 8" Model 131-EJ / H.S. / Beaumont Connection $ 636.00 $ 636.00 Main Valve & Pilot Rubber Rebuild Kit
41) 2 8" Model 131-CW / H.S. / Mtn. to Foothill West $ 646.00 $ 1,292.00 Main Valve & Pilot Rubber Rebuild Kit
42) 2 24" Model 631-01 / Brinton Reservoir $ 1,665.00 $ 3,330.00 Main Valve & Pilot Rubber Rebuild Kit
43) 1 16" Model 210-GL / Southwest Reservoir $ 2,937.00 $ 2,937.00 Main Valve & Pilot Rubber Rebuild Kit
44) 2 20" Model 210-GL / San G Reservoir $ 3,283.00 $ 6,566.00 Main Valve & Pilot Rubber Rebuild Kit
45) 1 6" Model 90-01 / @ Hi Valley Tank Fire Supplement $ 532.00 $ 532.00 Main Valve & Pilot Rubber Rebuild Kit
46) 1 8" Model 750-01 / Banning Heights Roll Seal $ 736.00 $ 736.00 Main Valve & Pilot Rubber Rebuild Kit
231
47)
1 1.5" Model 90-01 / Lincoln & Woodland $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 48)1 3" Model 50-01 / Lincoln & Woodland $ 950.00 $ 950.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 49)1 6" Model 90-01 / Lincoln & Woodland $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 50)1 8" Model 90-01 / Lincoln & Woodland $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 51)1 3" Model 50-01 / 16th & Hays $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 52)1 1.5" Model 90-01 / 16th & Hays $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 53)1 6" Model 90-01 / 16th & Hays $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 54)1 12" Model 90-01 / 16th & Hays $ 2,525.00 $ 2,525.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 55)1 3" Model 50-01 / 8th & Jacinto $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 56)1 1.5" Model 90-01 / 8th & Jacinto $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 57)1 6" Model 90-01 / 8th & Jacinto $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 58)1 8" Model 90-01 / 8th & Jacinto $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 59)1 3" Model 50-01 / 4th & Wilson $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 60)1 1.5" Model 90-01 / 4th & Wilson $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 61)1 6" Model 90-01 / 4th & Wilson $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 62)1 12" Model 90-01 / 4th & Wilson $ 2,525.00 $ 2,525.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 63)1 2" Model 50-01 / San G & Gilman $ 898.00 $ 898.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 64)1 1.5" Model 90-01 / San G & Gilman $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 65)1 4" Model 90-01 / San G & Gilman $ 1,319.00 $ 1,319.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 66)1 6" Model 90-01 / San G & Gilman $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 67)1 4" Model 50-01 / Almond & Hoffer $ 1,111.00 $ 1,111.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 68)1 1.5" Model 90-01 / Almond & Hoffer $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 69)1 4" Model 90-01 / Almond & Hoffer $ 1,319.00 $ 1,319.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 70)1 8" Model 90-01 / Almond & Hoffer $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 71)1 3" Model 50-01 / 8th & George $ 950.00 $ 950.00
Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 72)1 1.5" Model 90-01 / 8th & George $ 1,106.00 $ 1,106.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F
232
73) 1 6" Model 90-01 / 8th & George $ 1,500.00 $ 1,500.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 74) 1 8" Model 90-01 / 8th & George $ 1,749.00 $ 1,749.00 Main Valve Epoxy Kit & Pilot Rubber Rebuild Kit, SS T&F 75) 1 16" Model 210-17 / Foothill West Reservoir $ 2,591.00 $ 2,591.00 Main Valve & Pilot Rubber Rebuild Kit
76) 1 6" Model 92-01 / Complete New Valve to Replace $ 11,095.00 $ 11,095.00 Misssing Valve / Epoxy Coated & SS Trim
77) 252 Labor / Prevailing Wage / 2 Men $ 354.00 $ 89,208.00 78) 64 Travel / 32 Days $ 160.00 $ 10,240.00
TOTAL / WITHOUT TAX $ 198,847.00
NOTES: Main Valve Rebuild Kit Consists of Disc, Diaphragm, & Spacer Washers Any hard parts are extra!!
This quotation is valid for 30 days from the above date.
After 30 days Cla-Val reserves the right to change the pricing due to material cost increases.
All prices are NET
AUTHORIZED BY: SALESPERSON: Mike Trosper
TERRITORY: 3900
QUOTATION EFFECTIVE FOR 30 DAYS FROM See Quote Number
MESSAGES: Quote is for estimating only, Cla-Val Service is billed on an actual time & materials used basis.
If you have any questions regarding this quotation please contact Mike Trosper - Cell (949)-923-0649 24100 Water St. [email protected]
Perris,CA. 92570
P. 951-657-1718 Ext.288 / Fax 951-657-8540
233
234
Cla-Val Maintence
Sheet
Size Catalog # Stock # Code Control Est. Cost Annually
IN Out
3" RV 3-100-1 100-01-63F MM 1/2" CRL 190 75 $397.00
4" Reg 4-90-01AB 90-01-55E OT 3/8" CRD 70 $430.00
6" Reg 6-90-01AB 90-01-55G OT 3/8" CRD 67 $532.00
8"Reg 8-90-01AB 90-01-57A OS 3/8" CRD 64 $606.00
Size Catalog # Stock # Code Control IN Out Annually
3" RV 6-50-01 50-01-35A OS 1/2" CRL 175 60 $397.00
2" Reg 2-90-01As 90-01-60E OT 3/8" CRD off $430.00
4" Reg 4" 90G-01 C9655 3/8" CRD 55 $532.00
8" Reg 8-90-01AB 90-01-57A OS 3/8" CRD 52 $606.00
Size Catalog # Stock # Code Control IN Out Annually
2" RV 2-50-01 50-01-3B QQ 1/2" CRL 200 60 $384.00
2" Reg 2-90-01AS 90-01-60E QP 3/8" CRD 55 $374.00
6" reg 6-90-01AB 90-01-56G MR 3/8" CRD 50 $532.00
Size Catalog # Stock # Code Control IN Out Annually
2" RV 2-50-01 50-01-3B QQ 1/2" CRL 99 55 $384.00
2" Reg 2-90-01AS 90-01-60E QP 3/8" CRD 50 $374.00
6"Reg 6-90-01AB 90-01-56C QR 3/8" CRD 57 $532.00
Size Catalog # Stock # Code Control IN Out Annually
8" East 8-100-01 131-01 JM 119 70 $825.00
8" West 8-100-01 92-01 IX $632.00
Location Size Catalog # Stock # Control IN Out Bi-Annually Well 1 Roll Seal 10" 10-790-01B CRD 179 78
Well 1 10" 5801 CRL 78 Atmos
Well 2 6" 6-50G-01B CRL 170 Atmos $553.00
Well 3 8" 8-50G-01AB CRL 167 $627.00
Well 4 Roll Seal 10" 10-790-01B CRD 190 Atmos
Well 4 10" 5801 CRL 180 Atmos
Well 7 Roll Seal 8" 8-750-01 H/P CRL 310 Atmos $736.00
Banning Heights Roll
Seal Roll Seal 8" $736.00
Location Size Catalog # Stock # Control IN Out Annually 10" 10-640-01BY 640-01-38IJ CDHS-18 100 70 $743.00 $743.00 Location Size Catalog # Stock # Control IN Out Annually 8 $636.00
8 $1,292.00
Canyon Pressure Sustaining Valves
Regulator Station @ Hargrave and John
Set Point
$1,965.00
Reg Station @ San Gorgonio And Lincoln
$1,965.00
Reg Station @ San Gorgonio Tank
$1,290.00
Reg Station @ Ring of Trees
$1,290.00
Reg Station @ K Mart
$1,457.00
$6,658.00
Beaumont Interconnection Rate of flow Control
Meadowline Interconnection Rate of flow Control
$1,928.00
$2,003.00
$2,003.00
235
Cla-Val Maintence
Sheet
Location Size Catalog # Stock # Control IN Out Annually Location Size Catalog # Stock # Control IN Out Annually 8" 90-01 $532.00 $532.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
3"RV 3-50-01 50-01-35A OS CRL 125 $950.00
6" Reg CRD $1,500.00
8" Reg 8-90-01AB 90-01-57A OS CRD $1,749.00
1 1/2" reg $1,106.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
3" RV CRL 120 $950.00
1 1/2" Reg CRD $1,106.00
6" Reg 6-90-01AB5 90-01-2839 PT CRD $1,500.00
12" Reg 12-90-01AB9 90-01-173E Os CRD $2,525.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
3" RV 3-50-01 50-01-35A OS CRL 135 $950.00
1 1/2" Reg CRD $1,106.00
6" Reg 50-01-158D CRD $1,500.00
8" Reg 8-90-01 90-01-157A OS CRD $1,749.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
3" RV 3-50-01 50-01-35A OS CRL 135 $950.00
1 1/2" Reg CRD $1,106.00
6" Reg 50-01-158D CRD $1,500.00
6" Reg New Valve 50-01-158D CRD $11,095.00
8" Reg 8-90-01 90-01-157A OS CRD $1,749.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
3" RV CRL 120 $950.00
1 1/2" Reg 1-1/2-90-01AS 90-01-1509K NR CRD $1,106.00
6" Reg 6-92-01BD 92-01-1067E NR CRL CRD $1,500.00
12" Reg 6-92-01BD 92-01-1070 NR CRL CRD $2,525.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
2" RV 2-50-01 50-01-2369B CRL 105 $898.00
1 1/2" Reg 1-1/2-90-01AS 90-01-1509K NR CRD $1,106.00
4" Reg 4-92-01BD 92-01-1068 NR CRL CRD $1,319.00
6" Reg 6-92-01BD 92-01-106TE NR CRL CRD $1,500.00
Size Catalog # Stock # Code Control IN Out Bi-Annually
$5,305.00
Interconnection Rate of flow Control
High Valley Supplement
Reg Station @ Lincoln and Woodland
$5,305.00
Reg Station @ 16th and Hays
$6,081.00
Reg Station @ 8th and Jacinto View
Reg Station @ 8th and George
$14,900.00
Reg Station @ 4th and Wilson
$6,081.00
Reg Station @ San Gorgonio and Gilman
$4,823.00
Reg Station @Almond and Hoffer
236
Cla-Val Maintence
Sheet
4" RV CRL 128 $1,111.00
1 1/2 Reg CRD $1,106.00
4" Reg 4-91-01ABS 91--01-132K CRD $1,319.00
8" Reg 8-91-01ABS 91-01-186B CRD $1,749.00
Location Size Catalog # Stock # Control IN Out Tri-Annually Mountain Tank 4" 4-210-01 CDS6A 9 $684.00
High Valley 4" 4-210-01BDY 2120-01-932JCDS6A / CRL 6 $948.00 Brinton Reservoir 24-16 131-01 $1,665.00
Brinton Reservoir 24-17 131-02 $1,665.00
Southwest Res. $2,937.00
San Gorgonio Res $3,283.00
San Gorgonio Res $3,283.00
Foothill west Res. $2,591.00
Size Stock # Control ASCO # Tri-Annually
6-660-31AB 660-3121H 102 c-3H 130 $775.00
6-660-31AB 660-31-6D 102 c-3H $775.00
6-660-31Ab 660-31-60 102 c-3H $775.00
4-60-31-AB 60-31-54E 102 c-3H $775.00
4-60-31AB 60-31-54E 102 c-3H $775.00
4-50-G-01B 81158-02 CRL 135 $447.00
6-60-11BY 60-11-98F 80 $558.00 $558.00
12-81-02 43213K 110 $937.00
12-60-46BY 60-4621G $1,275.00
12-60-46BY 60-4621G $1,275.00
10-81-02 43-2128 $701.00
10-60-46BY 60-46-20J $1,186.00
513-6 3/04 8039-9 185 $820.00
6-50-01 190 $553.00
6-61-02-224 61-02-224J CSM11 120 $507.00
3-52-03 52-03-797C CRA / CRL 100 $670.00
6-61-02-224 61-02-224J CSM11 110 $507.00
3-52-03 52-03-797C CRA / CRL 90 $670.00
6-61-02-224 61-02-224J CSM11 125 $507.00
3-52-03 52-03-797C CRA / CRL 105 $670.00
6-61-02 61-02-90B CSM11 $507.00 $507.00
Pump Control Valves
$5,285.00
Altitude Valves
$17,056.00
Location
C2 Booster 1 Pump Control
$4,322.00
C2 Booster 2 Pump Control
C2 Booster 3 Pump Control
C2 Booster 4 Pump Control
C2 Booster 5 Pump Control
C2 RV
C6 Pump Control Clow Valve
C6 RV $1,373.00
C3 Booster Pump Control
C4 Well Check Valve
$3,487.00
C4 Booster 1(E) Pump Control
C4 Booster 2 (W) Pump Control
C5 Well Check Valve
C5 Booster Pump Control $1,887.00
M12 Well Pump Control
M3 Well Pump Control
M3 Well Surge Anticipator $1,177.00
M10 Well Pump Control
M10 Well Surge Anticipator $1,177.00
M11 Well Pump Control
M11 Well Surge Anticipator $1,177.00
237
Cla-Val Maintence
Sheet
Year 1 Year 2
Annually $11,170.00
Labor $22,656.00
Travel $2,880.00 $36,706.00 $36,706.00
Bi-Annually $54,438.00
Labor $31,152.00
Travel $3,840.00 $89,430.00
Tri-Annually $32,721.00
Labor $35,400.00
Travel $4,160.00
$36,706.00 $126,136.00
Year 3
$36,706.00
$72,281.00
$198,417.00
$36,706.00
$89,430.00
$72,281.00
$89,430.00
238
CITY OF BANNING
STAFF REPORT
TO: CITY COUNCIL
FROM: Douglas Schulze, City Manager
PREPARED BY: Amber Rockwell, CORE Manager
Jim Steffens, Interim Electric Utility Director
MEETING DATE: January 9, 2024
SUBJECT: Consideration of Resolution 2024-03, Approval of the Synergy Professional Services Agreement for Energy Efficiency Programs through a Task Order with the Southern California Public Power Authority (SCPPA)
RECOMMENDATION:
Adopt Resolution 2024-03:
1. Approving the energy efficiency program professional service agreement with Synergy through Southern California Public Power Authority (SCPPA) for an amount not to exceed $600,000 over three fiscal years and authorize the City Manager or his designee to execute all necessary agreements.
2. Authorizing the City Manager, or their designee to make necessary bucket adjustments, appropriations, and transfers related to this resolution.
BACKGROUND:
SCPPA is a Joint Powers Authority, formed in 1980 under the Joint Exercise of Powers Act of the California Legislature. The City of Banning Electric Utility is one of eleven municipal utilities and one irrigation district that make up the members of SCPPA. Over the years, SCPPA’s role has evolved from generation and transmission acquisition, to include legislative advocacy and cooperative efforts to reduce member costs and improve efficiency.
As a SCPPA member, the City of Banning Electric Utility has the benefit of participating in Professional Services Agreements that SCPPA executes at the request of, and on the behalf of, its members. The Electric Department participates in SCPPA’s Public Benefit Committee where activities include the preparation of a State required annual report, which details the use of Public Benefit Funds, and the exchange of information regarding energy efficiency (EE), renewable energy, research, and development programs and low-income services.
In 2022, The Synergy Energy Audit Measures (S.E.A.M.) program replaced the Business Energy Efficiency Funds (B.E.E.F) Program. The BEEF Program limited energy audits and EE direct installs to only commercial businesses. Seeing the need to help a growing number of low-income customers, the S.E.A.M. Program was developed. This program assists an underserved segment of the community while still providing free energy audits and EE direct installs to City of Banning businesses. Under the S.E.A.M. Program, free energy audits and EE measures are now offered to manufactured homes and single-family residences as well.
On September 12, 2023, Resolution 2023-158 was passed ratifying all current SCPPA Task Orders and Master Service Agreements. Within this resolution was the adoption of Task Order BEU-01 and Master 239
Services Agreement for Synergy Companies. The expiration on this Task Order was October 15, 2023.
At this time, direction was given by to only seek approval for existing Task Orders and Master Service Agreements and bring forth new Task Orders and Master Service Agreements through SCPPA for approval on a future date. Task Order BEU-01 expired before execution.
JUSTIFICATION:
California Assembly Bill 723 requires municipal electric utilities to collect revenues for the following Public Benefit Programs:
(1) Cost-effective demand-side management services to promote energy efficiency and energy conservation.
(2) New investments in renewable energy resources and technologies consistent with existing statutes and regulations which promote those resources and technologies. (3) Research, development and demonstration programs for the public interest to advance science or technology which is not adequately provided by competitive and regulated markets. (4) Services provided for low-income electricity customers, including but not limited to, targeted energy efficiency services and rate discounts
Synergy Companies currently administers energy savings programs for small business audits with direct installations, manufactured homes and residential audits with direct installation, and municipal department (EE) updates.
FISCAL IMPACT:
Funds for program expenditures shall be effective from January 9, 2024, to October 15, 2026, with a not to exceed amount of $600,000 for the term of the Task Order. Funds will be budgeted in Public Benefits account 675-7020-473.42-58.
Year Estimated Amount
2023/2024 $200,000
2024/2025 $200,000
2025/2026 $200,000
ALTERNATIVES:
1. Adopt Resolution 2024-03 as recommended.
2. Do not approve Resolution 2024-03 and discontinue City of Banning Electric Utility S.E.A.M. program, abandoning all current projects and dismissing those customers on the current waitlist.
ATTACHMENTS:
1. Resolution_2024-03__Synergy.pdf
2. Exhibit A_SCPPA_Task_Order_BEU_02_-_Synergy_updated__002_.pdf
3. 2023_-_CC_Resolution_No._2023-158_-_Ratifying_SCPPA_Task_Orders.pdf
4. 2023 Synergy updated MSA valid until 10-15-26.pdf
5. BEU-01-A-01_Synergy - signed not executed.pdf
6. SEAM Program 1 Page Flier Business.pdf
7. SEAM Program 1 Page Flier MHP.pdf
8. SEAM Program 1 Page Flier SFR.pdf
240
Resolution 2024-03
RESOLUTION 2024-03
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BANNING, CALIFORNIA,
APPROVING THE SYNERGY PROFESSIONAL SERVICE AGREEMENT FOR ENERGY
EFFICIENCY PROGRAMS THROUGH A TASK ORDER WITH THE SOUTHERN CALIFORNIA
PUBLIC POWER AUTHORITY (SCPPA)
WHEREAS, the City of Banning is a general law municipality governed by elected city councilmembers; and
WHEREAS, the City of Banning owns and operates a retail electrical energy distribution system which serves load to end-use customers in an assigned area of service; and WHEREAS, the City of Banning Electric Utility is one of eleven municipal utilities and one irrigation district that make up the members of SCPPA. Over the years, SCPPA’s role has evolved from generation and transmission acquisition to include legislative advocacy and cooperative efforts to reduce member costs and improve efficiency; and WHEREAS, as a SCPPA member, the City of Banning Electric Utility has the benefit of participating in Professional Services Agreements that SCPPA executes at the request of, and on behalf of, its members; and
WHEREAS, the Electric Utility, through Public Benefits funds, offers the S.E.A.M. Program to customer to provide for energy audits and energy efficient direct installs, and WHEREAS, the Electric Utility desires to enter into a new Task Order with SCPPA to renew a three-year agreement with Synergy to administer the S.E.A.M. Program.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Banning as follows:
SECTION 1. The City Council adopts Resolution 2024-03 ratifying and approving the new professional service agreement with Synergy for the identified energy efficiency programs through a Task Order with the Southern California Public Power Authority (SCPPA), included in Exhibits 1-7, attached hereto and incorporated by reference for a total not to exceed $600,000 for the term of the Task Order budgeted within Public Benefits account 675-7020-473.42-58.
SECTION 2. The City Council ratifies the new Master Services Agreement and Task Order and authorizes the City manager and/or his designee to execute the unexecuted professional service agreement, task order, and amendment made available through SCPPA for Synergy Companies.
SECTION 3. The City Council authorizes the City Manager, or designee, to make necessary budget adjustments, appropriations, and transfers related to this resolution.
SECTION 4. The City Clerk shall certify to the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions. 241
Resolution 2024-03
PASSED, APPROVED AND ADOPTED this 9th day of January 2024.
Alberto Sanchez, Mayor
City of Banning
ATTEST:
Caroline Patton, Administrative City Clerk
City of Banning
APPROVED AS TO FORM AND
LEGAL CONTENT:
Serita R. Young, City Attorney
Richards, Watson & Gershon
242
Resolution 2024-03
CERTIFICATION:
I, Caroline Patton, Deputy City Clerk of the City of Banning, California, do hereby certify that the foregoing Resolution 2024-03, was duly adopted by the City Council of the City of Banning, California, at a regular meeting thereof held on the 9th day of January 2024 by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
Caroline Patton, Administrative City Clerk
City of Banning, California
243
Resolution 2024-03
EXHIBIT A
Synergy Agreement
244
TASK ORDER NO: BEU-02
1 DATE: October 19, 2023
PROJECT DESCRIPTION: Commercial and Residential Direct Install Programs PARTICIPATING MEMBER: Banning Electric Utility
CONSULTANT: Eagle Systems International, Inc. DBA Synergy Companies Synergy Companies (“Consultant”), SCPPA, and the Participating Member (“Participant” or “Banning Electric Utility”) identified above agree that Consultant shall provide the Services specified herein pursuant to the terms and conditions of the Master Professional Services Agreement (“Agreement”) between SCPPA and Contractor dated October 15, 2020, and as Amended on December 16, 2021, and July 20, 2023, except as specifically modified herein.
SCOPE OF SERVICES
Overview
The consultant will implement the Banning Electric Commercial and Residential Direct Install Programs.
Task 1: Program Administration
Consultant shall oversee program administration and provide a database tool for program tracking, which will be stored in a Secure File Transfer Protocol (SFTP network infrastructure).
The database will contain the BEU customer participation records. It will allow BEU to have access to important program data points including, but not limited to energy measures installed, energy assessment forms, and data. Consultant will work with the BEU authorized representative to administer the program and assist customers that reach out directly to BEU.
Administrative duties performed by Consultant will also include monthly reporting, invoicing, and customer service.
Task 1.1: Marketing
Consultant shall market the Energy Efficiency Programs to eligible BEU customers. Eligible customers are commercial customers, residential single-family, residential multi-family, and 245
TASK ORDER NO: BEU-02
2 residential manufactured housing customers. All the marketing collateral needs to adhere to the BEU style guide and be approved by BEU before execution.
Task 1.2: Schedule Program Services
a) Consultant shall provide a dedicated phone number for all BEU customer contacts including scheduling assessments, providing program information, and to answer customer inquiries during normal business hours, Monday through Friday between 8AM - 5PM. b) Consultant shall be responsible for responding to customers within two (2) business days to schedule program services.
c) Consultant shall limit customer site visitsto no more than two (2) visits per customer to provide products and services as described in the Measure Pricing Worksheet attached hereto as Attachment 1. Consultant shall schedule more than (2) visits if only requested by customer to accommodate the customer's schedule.
Task 1.3: Customer Verification
a) Consultant shall verify customer's status as an active BEU electric customer. Customer data shall be transferred through a Consultant provided secure file transfer protocol (SFTP) site or by other secure means.
b) Consultant shall ensure that customers only participate in the program once every 5 years, unless significant changes have occurred at the property (e.g. home remodel, new tenant, new ownership, etc.) or authorized through pre-approval by BEU.
Task 2: Energy Assessments
Task 2.1: On-Site Energy Assessment
a) Consultant shall conduct a thorough whole house energy assessment for commercial, single family, multifamily, and manufactured housing residential customers to assess customer's existing appliances and equipment. b) Consultant shall be required to complete the energy assessment during the on-site visit, using an electronic device such as a laptop or tablet, and answer whole building efficiency and optimization questions including building envelope, lighting, various energy appliances, measures, and potential occupant behaviors. c) During the visit, the Consultant shall quantify each device's estimated energy consumption and identify opportunities for enhanced energy-use efficiency and shall educate the customer by providing clear and actionable recommendations to save energy.
d) Assessments shall be conducted during normal business hours, Monday through Friday including one weekend per month between the hours of 8AM - 5PM. 246
TASK ORDER NO: BEU-02
3 Task 2.2: Final Assessment Report
a) The report shall include energy savings recommendations. b) Consultant shall provide reports by email provided by the customer or standard mail, if preferred by the customer, within (3) business days of the assessment completion.
Task 3: Direct Installation of Energy Efficiency Products During the on-site visit, the Consultant will assess the opportunity for the installation of energy efficiency measures. Based upon the assessment and customer approval, the Consultant shall directly install and distribute energy efficiency measures and products, as determined by BEU within the Program Pricing Worksheet. Consultant shall process installation agreement forms. a) Consultant shall provide reports along with itemized invoices for completed installations to BEU monthly.
b) Installation of energy measures shall be performed at time of scheduled on-site visits. c) These visits shall be at the convenience of the customer during mutually agreed times, to minimize the impact on the customer.
d) Consultants shall ensure the safety of the building's occupants by performing the required combustion safety test using Building Performance Institute (BPI) protocols and Natural Gas Appliance Testing (NGAT) standards. All unsafe or hazardous condition caused by a Consultant shall be addressed and corrected by Consultant before leaving the premises.
Task 3.1: Single Family Homes, Multi-Family Homes, Manufactured Housing Homes Consultant shall install Air Conditioning, Lighting, Plug Load, and Weatherization measures as determined by BEU, and included in Program Pricing Worksheet.
Task 3: Quality Assurance
The Consultant shall follow the quality assurance plan incorporated herein as Exhibit A.
Compensation and Schedule
This task order shall be effective from January 1, 2024, to October 15, 2026, with a not to exceed amount of $600,000 for the term of the Task Order. Consultant shall invoice BEU monthly, after completion of onsite energy assessments, installation of energy measures, and delivery of final reports to BEU and BEU customers.
247
TASK ORDER NO: BEU-02
4 Representatives of Participating Member and Consultant
BANNING ELECTRIC UTILITY
Name: Doug Schulze
Position: City Manager
Street: 99 E Ramsey St
City, State Zip: Banning, CA 92220
Phone # 951-922-3104
Email: [email protected]
Name: Amber Rockwell
Position: C.O.R.E. Manager
Street: 176 E Lincoln St
City, State Zip: Banning, CA 92220
Phone # 951-849-5224
Email: [email protected]
SYNERGY COMPANIES
Doug Price
SoCal General Manager
90 Business Park Drive
Perris, CA 92571
951-443-6151
[email protected]
Matthew Clark
Vice President of Business Development
90 Business Park Drive
Perris, CA 92571
951-230-6425
[email protected]
Amendment(s) to the Agreement
None.
[SIGNATURE PAGE FOLLOWS]
248
TASK ORDER NO: BEU-02
5 IN WITNESS WHEREOF, the parties have signed this Task Order as of the date first written above.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
By:
MICHAEL S. WEBSTER
Executive Director
Approved as to Legal Form and Content:
ARMANDO ARBALLO
Associate Counsel
EAGLE SYSTEMS INTERNATIONAL, INC.
DBA SYNERGY COMPANIES
By:
MATTHEW CLARK
Vice President of Business Development
Participant’s Acknowledgement and Agreement
The undersigned hereby attests that he has the requisite authority to bind the Participant to the obligations set forth in this Task Order. Participant agrees to be responsible for any and all fees, costs and expenses invoiced to SCPPA by Consultant for work performed on behalf of, or for the benefit of, Participant pursuant to the Agreement.
249
TASK ORDER NO: BEU-02
6 Participant agrees to indemnify, defend and hold harmless SCPPA, all other members and their respective directors, officers, agents, representatives, employees, successors and assigns from and against any and all losses, injuries, costs and expenses, damages, liens, claims, or liabilities, including reasonable attorney’s fees, incurred by SCPPA in connection with the work performed for the benefit of, or on behalf of, Participant pursuant to the Agreement, except for the gross negligence or willful misconduct of SCPPA or such other SCPPA members, and their officers, agents, representatives or employees.
CITY OF BANNING ELECTRIC UTILITY
By:
Doug Schulze
City Manager
250
EXHIBIT A
EXHIBIT A-1
Quality Assurance Plan
This document is the Quality Assurance Manual Synergy Programs.
Energy Efficiency Programs
Quality Assurance Plan (QAP):
Synergy Companies
251
EXHIBIT A
EXHIBIT A-2
Introduction
Purpose
The QAP describes the strategy and methods used to ensure that the program:
• Produces high-quality outputs (quality control/quality assurance) • Seeks to continuously improve itself (quality improvement) • Satisfies customers (customer centric).
Quality Assurance Vision
Synergy is committed to providing quality services that meet the performance, cost, and schedule requirements of our clients and customers. Our processes are established on practices, tools, and software that generate consistently reliable results. Our workflow management tools integrate fundamental management and communication techniques, technical processes, and tools into an approach focused on the quality of deliverables. Synergy’s team concentrates on continuous improvement of business processes, customer satisfaction, and continuous quality measurement of delivered services, while identifying opportunities for process improvements.
The success of Synergy’s programs and projects are made possible by adherence to proven quality standards and established QA methods that enable us to offer our clients:
Energy efficiency and sustainability programs that use mature, well-defined, and repeatable processes.
Use of proven measurement and verification (M&V) techniques.
Use of beneficial, cost-effective IT, data communications, and marketing tools and methodologies.
Consistency and transparency in both the methodology of analysis and the presentation of findings is critical if programs and projects are to achieve their objectives of meeting energy reduction goals or funding requirements. To that end, Synergy uses integrated tools for use in collection, analysis, and presentation of building and energy data.
Quality Assurance Plan Purpose
Synergy has developed this QA plan to demonstrate how our team will monitor, assess, and ensure adherence to processes, procedures, and standards to determine the quality and on-time delivery of all deliverables and services for the program. This plan will serve as the blueprint for maintaining consistent quality through all components of the project and in each task.
The QA plan documents the procedures by which the team assesses performance for all aspects of the program against contractual requirements. The plan describes the approach for activities, including program tracking and reporting, process reviews, program audits, project engineering analyses and reports, procedures, and techniques for implementing and sustaining overall quality for the program.
252
EXHIBIT A
EXHIBIT A-3
Quality Assurance Plan Scope
Synergy has created a QA framework to form the basis of the complete quality management approach and strategy. The processes defined in the plan will be leveraged to implement quality into all aspects of performance. Synergy’s workflow management software will guide and track the process to ensure compliance in a transparent manner.
The objective of the QA plan is to describe the roles and responsibilities and the policies and procedures that ensure consistency and quality throughout the projects. The objective enables the QA team to achieve critical measurable results for the program, such as:
Predictable Results: The QA plan is to ensure that deliverables and services are produced in an efficient, effective, reliable, and predictable manner that will consistently produce results compliant with the contractual requirements of the program.
Error Prevention: The QA plan prevents the introduction of errors into deliverables and services. Any errors that are found undergo analysis and subsequent action to preclude reintroduction of the error. This aspect of the QA plan includes the structured approach to pursuing continuous improvement in all aspects of the program.
M&V Documentation: The QA plan ensures a structured approach to the defining, recording, and storing of documentation related to requirements, approvals, reviews, tests, decisions, actions, events, and problems and improvement measures to support verification, validation, and traceability.
Customer Satisfaction: The QA plan ensures the customer receives the best possible deliverables and services. Customer satisfaction surveys will be conducted so that participants may comment on the program and the contractor. Surveys will be conducted either by mail, email or by telephone. The results of the survey will be entered into the database management tool.
Continuous Improvement: Feedback from all the above is used in an ongoing effort to improve the program implementation processes. Results from the survey will be quantified and shared with the program advisor.
Quality Assurance Plan Field Operating Guidelines
A. Technician Training
New technicians receive individual classroom training from the production supervisor and on-the-job training by serving as a helper from a certified trainer.
All technicians are required to pass the EPA test to handle HVAC refrigerants and to become EPA certified. Synergy regularly enrolls its technicians in technical training.
All technicians are required to attend a weekly tailgate meeting, plus a monthly 253
EXHIBIT A
EXHIBIT A-4
technician meeting for on-going training. The type of information that is covered in these training sessions would include measure and service standards, review of safety standards, motivation, customer service, and quality control instruction.
The production supervisor or assistant production manager also provides one-on-one training to technicians in the field.
B. Geotagged Photos of Measures Installed
A geotagged photo is taken of every measure installed for each project completed. The geotagged photo contains the location expressed in latitudinal and longitudinal geo coordinates to several decimal places for increased accuracy. A time stamp and date are also included with these photos that matches the time and date of the completed project.
Geotagged photos assure that the measures reported are installed at the location specified.
With geotagged photos, projects can be inspected remotely with confidence for verifying quality installation and measure reporting accuracy.
The geotagged photos are included with each invoiced project and uploaded to the program’s designated energy efficiency collaboration platform. Geotagged photos can also be shared on an as requested basis for program inspection verification.
C. Technician Installation Guide Mobile Application
The Company provides each technician with an installation and customer service electronic application for download onto their mobile device. The installation guide application provides the measure installation instructions for each program measure serving as a helpful field reference for installation standards.
D. Weekly Tailgate Meeting
A weekly tailgate meeting is held with the technicians to review work schedules, common work issues, and to reinforce quality installations and customer service. This is an excellent time for communication between the production manager and team leads with each technician.
E. Monthly Technician and Associates Meeting
A more formal meeting is held with all company associates once a month where more extensive training and motivation takes place. Each technician is required to attend these meetings. In the event a technician misses the meeting, he receives a follow-up email outline of the meeting and a briefing by his team lead.
F. Dedicated Team Lead
Synergy has established a dedicated program quality production manager and additionally an in-house inspector that works with the technicians to maximize customer service and quality.
254
EXHIBIT A
EXHIBIT A-5
As jobs are inspected, technicians who performed the job being inspected are invited to ride-along with the Synergy in-house inspector to observe and receive feedback on his or her performance. We have found this to be a very helpful learning and teaching opportunity.
Inspection and Verification Plans and Procedures
A. Synergy Inspections and Internal Audit
As mentioned previously, Synergy maintains QPM’S (Quality Production Managers) and/or an in-house inspector that review all electrification and tier 2 efficiency installations for proper functionality and safety. This process will help assure that electrification jobs are maintained to production standards.
The QPMs inspect a minimum of 15% of all non-electrification and non-tier 2 efficiency installation jobs per month. 5% of all jobs are inspected every payroll period with hookups to verify measurements, and an additional 5% of jobs are visually inspected.
Each technician has at least 1 job inspected visually, and 1 job inspected with hookups every pay period.
Desk review verifications of geotagged photos are electronically conducted on 100% of projects completed to ensure that each project has an accompanying geotagged photo file of every measure installed.
B. Correction on Failed Inspections and Confirmation of Energy Savings.
If a job is failed through the COMPANY’s or contractor’s inspection process, either the quality production manager or inspector will do the “repair or correction” or the “installing technician” is required to return to the customer’s home to complete the “repair or correction” on the job.
Under either circumstance, the inspector or installer is to note on the inspection sheet or call the QPM with the date and confirmation of the follow-up visit.
Resolving Customer Issues
Information on customer issues will be recorded in the monthly report. Synergy will address and resolve customer issues discovered through either survey feedback or other means of customer contact. Synergy will pursue continuous improvements to promote complete customer satisfaction. Customer feedback issues will be tracked by Synergy using the monthly reports, as well as a completed complaint form. If any issues cannot be resolved to the satisfaction of the customer by Synergy within five (5) days, Synergy shall immediately provide the program advisor with a detailed description of any such complaint, which will include the name and contact information of the customer and any other information requested by Company.
Synergy will have an Energy Efficiency information sheet with the telephone number on it that 255
EXHIBIT A
EXHIBIT A-6
will reinforce an invitation for the customer to contact Synergy with any questions or issues.
Synergy will have adequate resources dedicated to quality control and customer satisfaction.
Synergy calls the park managers/owners and residents/owners after the work is completed to determine satisfaction and to gain other important information about the work completed. For those customers that may have had some type of reservations, Synergy will quickly respond to any concerns to ensure that customer concerns are adequately addressed.
Synergy will also arrange for an in-house inspector that physically and randomly inspects 5% of jobs completed.
The complaints are maintained in a complaints database, including the nature and date of the complaint and how it was handled. A summary of complaints and compliments are provided in the monthly report.
Double-Dipping Prevention Plan
Prior to paying any Incentives for a Measure or providing other program services to a customer, Synergy does a duplicate measure request inquiry (DMRI) of program data for the customer’s site to determine what measures the customer is eligible for and the same DMRI is conducted at the time of invoicing as an additional control to prevent double-dipping.
DEER and CPUC approved IOU workpaper guidelines for measure base cases are followed to determine feasibility of installing a measure. Previously installed measures can be replaced by the program at the end of their effective useful life (EUL) or remaining useful life (RUL).
Quality Assurance Methodologies
A. DEEMED Methodology
Energy efficiency programs use approved IOU workpapers that are CPUC approved and DEER to determine program energy savings. The contractor and its M&V subcontractor stay current with changes to DEEMED energy savings and potential new approved DEEMED measures and report these to the COMPANY’s program advisor. Program energy savings are adjusted as energy savings changes occur.
B. NMEC
The net metering energy consumption (NMEC) meter-based approach is suitable for programs when no robust and relevant field data exists for the newly proposed innovative measures today, which require these solutions to have to go through more time consuming channels including but not limited to the Emerging Technologies (ET) or customized/calculated pathways. By including the NMEC approach into the program design, the program creates multiple benefit streams including:
1. Immediate consumer adoption.
2. Field data collection that supports future deemed energy savings estimates 256
EXHIBIT A
EXHIBIT A-7
3. Early collaboration with utility and the CPUC’s Ex-Ante Review (EAR) team on measurement and verification (M&V) plans and variables.
4. Standardized data collection procedures compliant with project energy savings estimates and supporting information that is consistent with the requirements set forth by the AB 802 legislation and the CPUC.
For each program or project, the QA team will be consulted on the approach to baseline operations and how measure implementation will be confirmed. Primarily, energy savings calculations will be based on data collected via Synergy’s contracted engineering consultant’s revenue grade 3-phase data acquisition meters and systems.
The QA team will be apprised of the analysis approach. The use of revenue grade 3-phase data acquisition tools will standardize the analytical process such that the QA process can focus on examining the results versus the process. When the energy savings analysis is completed for each project, the analysis will be independently reviewed by the QA team to confirm agreement with the savings estimates and approach to the savings estimates for the measures. The review methodology will be established to examine processes against quality factors using Synergy’s workflow management tools, such that the QA checks and results must be recorded for the project to move to the next stage. Examples of quality factors include:
Correctness: The extent to which a deliverable satisfies the requirements and the stated objectives.
Timeliness: The deliverable is provided when required.
Reliability: The extent to which a deliverable is provided on a consistent basis.
Productivity: The amount of resources to correctly produce the deliverable, including the relationship between the amounts of time needed to accomplish work and the effort expended.
Via the online database, Synergy will maintain a clear record of all project findings, including on-site notes, building and equipment data, and operating characteristics. Secondary review of randomly selected projects will periodically check the QA process to ensure that:
The QA process has been followed, verified by checking that all data and required checks are recorded.
The project results are reasonable, verified by recalculating results using a secondary methodology such as engineering calculations.
Project documentation is complete.
Initial Customer Engagement
Synergy will record initial customer engagement in standard Customer Relationship Management (CRM) software. For sponsored projects and programs, Synergy will make this data available to import into sponsor’s CRM systems. In addition to standard contact 257
EXHIBIT A
EXHIBIT A-8
information, data may include energy consumption, facility metrics such as size, and Return on Investment (ROI) goals.
Benchmarking
Synergy will benchmark facilities with Energy Star Portfolio Manager using customer-provided building and energy data. This ensures repeatability of results. Simple kW/sf and kWh/sf benchmarks will be calculated, entered into the CRM software, and used as an indicator of energy savings potential. For projects that move forward, benchmarking will be performed using the Energy Star Portfolio Manager tool based on measured power consumption data. 258
ATTACHMENT 1
1 Measure Pricing Worksheet
02_Synergy_Fees_S
CPPA EE Audits and
259
ATTACHMENT 1
1 260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
AMENDMENT NO. 2
TO THE MASTER GOODS AND SERVICES AGREEMENT BETWEEN
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
AND
EAGLE SYSTEMS INTERNATIONAL, INC. DBA SYNERGY COMPANIES This Amendment No. 2 to the Master Professional Services Agreement between the Southern California Public Power Authority (“SCPPA”) and the Eagle Systems International, Inc. DBA Synergy Companies (“Contractor”) (the “Agreement”), is made and entered into this 20th day of July 2023.
WHEREAS, on October 15, 2020, the SCPPA Board of Directors approved and adopted Resolution 2020-107 to authorize SCPPA to execute the Agreement; WHEREAS, the Agreement is dated October 15, 2020;
WHEREAS, the Agreement has a term of three years with the option to extend the term of the Agreement for one (1) additional term of three (3) years; WHEREAS, on December 16, 2021, SCPPA executed Amendment No. 1 to the Agreement to increase the contract not to exceed amount and update the insurance and standard of care provisions provided in the Agreement;
WHEREAS, SCPPA and Contractor wish to implement an update to update the SCPPA - Synergy Residential Efficiency Services and Products List and the SCPPA - Synergy NonResidential Efficiency Services Products List identified in Exhibit A of the Agreement; WHEREAS, SCPPA and Contractor wish to extend the term of the Agreement for an additional term of three (3) years and increase the contract not to exceed amount from ten million two hundred and fifty thousand dollars ($10,250,000.00) to eighteen million five hundred fifty thousand ($18,550,000.00).
NOW, THEREFORE, in consideration of the premises herein, and for good and valuable consideration, the Parties agree as follows:
1. The SCPPA - Synergy Residential Efficiency Services and Products List and the SCPPA - Synergy NonResidential Efficiency Services and Products List identified in Exhibit A of the Agreement shall be superseded and replaced with the SCPPA - Synergy Residential Efficiency Services and Products List and the SCPPA - Synergy NonResidential Efficiency Services Products List provided in Exhibit 1 of this Amendment No. 2 to the Agreement.
2. Pursuant to Section 10 of the Agreement, the term of the Agreement shall be extended for one (1) additional term of three (3) years so that the Agreement shall now expire on October 15, 2026.
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1977 514
3. The cost of all goods and services provided during the term of the Agreement, including reimbursement of reasonable out-of-pocket expenditures, shall not eighteen million five hundred fifty thousand ($18,550,000.00).
4. Except as provided herein, all other terms and conditions of the Agreement shall remain in full force and effect.
IN WITNESS WHEREOF, each signatory hereto represents that he or she has been properly authorized to execute and deliver this amendment on behalf of the party for which he or she signs.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
By:
MICHAEL S. WEBSTER
Executive Director
Approved as to Legal Form:
CHRISTINE GODINEZ
General Counsel
and;
EAGLE SYSTEMS INTERNATIONAL, INC. DBA SYNERGY COMPANIES By:
MATTHEW CLARK
Vice President of Business Development
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1978 515
EXHIBIT 1
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1979 516
# Technology Residential Measures Unit
Definition
Standard Unit
Price
Volumetric Pricing
(500 + Annual
Installations)
Volumetric Pricing
(1,000 + Annual
Installations)
R-1 Air Conditioning AC Tune-up (Refrigerant Charge, Condenser Coil Clean and Airflow) per system $ 290.40 $ 283.14 $ 275.88 R-2 Air Conditioning Attic solar fan - Large (up to 3000 sq ft 1900 CFM and 50W per household $ 1,031.25 $ 1,005.47 $ 979.69 R-3 Air Conditioning Attic solar fan - Medium (up to 2000 sq ft 1275 CFM and 20 W) per household $ 981.75 $ 957.21 $ 932.66 R-4 Air Conditioning Attic solar fan - Small (upto 1200sq ft 850 CFM & 10 watt) per household $ 981.75 $ 957.21 $ 932.66 R-5 Air Conditioning Brushless motor 1/2 HP per ton per ton $ 184.94 $ 180.31 $ 175.69 R-6 Air Conditioning Ceiling Fan w/ light-all 53-60" per fixture $ 412.50 $ 402.19 $ 391.88 R-7 Air Conditioning Ceiling Fan w/ light-all medium 42-52 " per fixture $ 369.40 $ 367.50 $ 365.50 R-8 Air Conditioning Ceiling Fan w/ light-all small 37-41" per fixture $ 321.75 $ 313.71 $ 305.66 R-9 Air Conditioning Ceiling Fan with No light Kit Large 53-60" per fixture $ 412.50 $ 402.19 $ 391.88 R-10 Air Conditioning Ceiling Fan with No light Kit Medium 42-52" per fixture $ 359.40 $ 357.50 $ 365.50 R-11 Air Conditioning Ceiling Fan with No light Kit Small-37-41" per fixture $ 321.75 $ 313.71 $ 305.66 R-12 Air Conditioning HVAC Duct Crossover Replacement - Manufactured Homes per ton $ 274.74 $ 267.87 $ 261.00 R-13 Air Conditioning HVAC Duct Return Retrofit - Manufactured Homes per ton $ 272.63 $ 265.82 $ 259.00 R-14 Air Conditioning HVAC Duct Test and Seal per system $ 493.63 $ 481.28 $ 468.94 R-15 Air Conditioning HVAC Duct Test and Seal - w/SoCalGas Program per system $ 222.48 $ 216.91 $ 211.35 R-16 Air Conditioning HVAC Efficient Fan Control per system $ 199.38 $ 194.39 $ 189.41 R-17 Air Conditioning HVAC Smart Programmable Thermostat per stat $ 389.00 $ 379.28 $ 369.55 R-18 Air Conditioning HVAC Smart Programmable Thermostat - w/SoCalGas Program per stat $ 250.00 $ 243.75 $ 237.50 R-19 Air Conditioning Programmable Thermostat per fixture $ 107.25 $ 104.57 $ 101.89 R-20 Air Conditioning Room AC Replacement per unit $ 957.00 $ 933.08 $ 909.15 R-21 Air Conditioning Whole House Fan - 1500 CFM per home $ 1,451.58 $ 1,415.29 $ 1,379.00 R-22 Air Conditioning Whole House Fan - 2500 CFM per home $ 1,893.68 $ 1,846.34 $ 1,799.00 R-23 Air Conditioning Whole House Fan - 3300 CFM per home $ 2,065.26 $ 2,013.63 $ 1,962.00 R-24 Air Conditioning Whole House Fan - 4800 CFM per home $ 2,350.53 $ 2,291.76 $ 2,233.00 R-25 Air Conditioning Whole House Fan - 5500 CFM per home $ 2,522.11 $ 2,459.05 $ 2,396.00 R-26 Air Conditioning Window Evap coolers per system $ 1,485.00 $ 1,447.88 $ 1,410.75 R-27 Appliance Microwave oven per fixture $ 206.25 $ 201.09 $ 195.94 R-28 Appliance Refrigerator Replacement & recycling-top mount freezer-16-18 cu ft per fridge $ 1,443.75 $ 1,407.66 $ 1,371.56 R-28 Appliance Refrigerator Replacement & recycling-top mount freezer-19-21 cu ft per fridge $ 1,636.25 $ 1,595.34 $ 1,554.44 R-29 Audits Energy and/or Water Audit (from basic to comprehensive analysis) per household $ 99 - 450 $ 94 - 429 $ 89 - 409 R-30 Fees Minimum trip charge per trip $ 99.00 Waived Waived R-31 Lighting LED A Lamp (6-9w) per lamp $ 13.75 $ 13.41 $ 13.06 R-32 Lighting LED A Lamp (6-9w) - Member Provided per lamp $ 6.88 $ 6.70 $ 6.53 R-33 Lighting LED Candelabra per lamp $ 13.75 $ 13.41 $ 13.06 R-34 Lighting LED Ceiling Flushmount (1 Bulb) 4 ft. White per fixture $ 136.13 $ 132.72 $ 129.32 R-35 Lighting LED Ceiling Flushmount (2 Bulb) 4 ft. White per fixture $ 204.88 $ 199.75 $ 194.63 R-36 Lighting LED Flood Lamp (11-12w) per lamp $ 21.12 $ 20.59 $ 20.06 R-37 Lighting LED Hardwired Ceiling Fixture (Circle) (17w) per fixture $ 128.59 $ 125.38 $ 122.16 R-38 Lighting LED Hardwired Porch Light per fixture $ 126.67 $ 123.50 $ 120.33 R-39 Lighting LED Night Lights per lamp $ 13.74 $ 13.39 $ 13.05 R-40 Lighting LED R-30 per lamp $ 35.75 $ 34.86 $ 33.96 R-41 Lighting LED R-40 per lamp $ 49.50 $ 48.26 $ 47.03 R-42 Lighting LED Retrofit 8 ft. and 4 ft. Light Fixtures with LED Kit per fixture $ 198.00 $ 193.05 $ 188.10 R-43 Lighting Occupancy sensor per sensor $ 75.63 $ 73.73 $ 71.84 R-44 Lighting Solar Tubes per fixture $ 1,395.63 $ 1,360.73 $ 1,325.84 R-45 Lighting Standard T8 to LED T8 Plug and Play - 2 foot per lamp $ 31.35 $ 30.57 $ 29.78 R-46 Lighting Standard T8 to LED T8 Plug and Play - 3 foot per lamp $ 37.95 $ 37.00 $ 36.05 R-47 Lighting Standard T8 to LED T8 Plug and Play - 4 foot per lamp $ 42.08 $ 41.02 $ 39.97 R-48 Lighting Standard T8 to LEDT8 Plug and Play - 8 foot per lamp $ 72.60 $ 70.79 $ 68.97 R-49 Plug Load Control Smart Power Strip (Tier 2) per fixture $ 181.50 $ 176.96 $ 172.43 R-50 Plug Load Control Smart Power Strip (Tier 2) - Install Only per fixture $ 66.00 $ 64.35 $ 62.70 R-51 Plug Load Control Smart Power Strip (Tier 1) per strip $ 74.25 $ 72.39 $ 70.54 R-52 Plug Load Control Smart Power Strip (Tier 1) - Install Only per strip $ 33.00 $ 32.18 $ 31.35 R-53 Pumps and Motors Variable speed drive pool pump - Residential per pump $ 2,406.25 $ 2,346.09 $ 2,285.94 R-54 Water - Indoor Faucet aerators - bath per fixture $ 9.56 $ 9.32 $ 9.08 R-55 Water - Indoor Faucet aerators - bath w/SoCalGas Program per fixture $ 5.00 $ 4.88 $ 4.75 R-56 Water - Indoor Faucet aerators - kitchen per fixture $ 13.68 $ 13.34 $ 13.00 R-57 Water - Indoor Faucet aerators - kitchen w/SoCalGas Program per fixture $ 7.50 $ 7.31 $ 7.13 R-58 Water - Indoor Low Flow Showerhead per fixture $ 25.44 $ 24.80 $ 24.17 R-59 Water - Indoor Low Flow Showerhead w/SoCalGas Program per fixture $ 12.50 $ 12.19 $ 11.88 R-60 Water - Indoor Low Flow Showerhead - Handheld per fixture $ 46.06 $ 44.91 $ 43.76 R-61 Water - Indoor Low Flow Showerhead - Handheld w/SoCalGas Program per fixture $ 23.00 $ 22.43 $ 21.85 Fees
Lighting
Plug Loads
Pumps and Motors
Water - Indoor
Audits
SCPPA - Synergy Residential Efficiency Services and Products List Manufactured-Mobile Homes, Multifamily Dwellings, and Single Family Residences Services and Products are calculated as an ALL-INCLUSIVE DIRECT-INSTALL PRICE (Includes Material, Labor, Marketing, Administration) Air Conditioning
Appliances
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1980 517
R-62 Water - Indoor Low Flow Toilet - 1.1 GPF per fixture $ 577.50 $ 563.06 $ 548.63 R-63 Water - Indoor Low Flow Toilet - 1.28 GPF per fixture $ 522.50 $ 509.44 $ 496.38 R-64 Water - Indoor Ultra Low Flow Toilet - 0.8 GPF per fixture $ 618.75 $ 603.28 $ 587.81 R-65 Water - Indoor Thermostatic Shower Valve per fixture $ 58.44 $ 56.98 $ 55.52 R-66 Water - Outdoor Weather Based Irrigation Controller per unit $ 397.38 $ 387.44 $ 377.51 R-67 Weatherization Add R-19 Attic insulation (up to R30) per sq ft $ 1.79 $ 1.74 $ 1.69 R-68 Weatherization Add R-19 Attic insulation (up to R30) - w/SoCalGas Program per sq ft $ 0.41 $ 0.40 $ 0.39 R-69 Weatherization Add R-38 Attic insulation (up to R38) per sq ft $ 2.09 $ 2.05 $ 1.99 R-70 Weatherization Attic / Whole House Seal per sq ft $ 0.54 $ 0.52 $ 0.51 R-71 Weatherization Blower door test-in only per test $ 168.78 $ 164.56 $ 160.34 R-72 Weatherization CAS testing (if desired or required by installation standards) per test $ 67.38 $ 65.69 $ 64.01 R-73 Weatherization Deeply Buried Ducting, R-60 Attic Insulation, Attic Plane Sealing, Duct Test and Seal per sq ft $ 2.59 $ 2.55 $ 2.52 R-74 Weatherization Door shoe per door $ 27.50 $ 26.81 $ 26.13 R-75 Weatherization Door Threshold per door $ 27.50 $ 26.81 $ 26.13 R-76 Weatherization Door weatherstripping flat type per door $ 67.38 $ 65.69 $ 64.01 R-77 Weatherization Hot water heater wrap per wrap $ 70.13 $ 68.37 $ 66.62 R-78 Weatherization Minor home repair per hour $ 68.06 $ 66.36 $ 64.66 R-79 Weatherization Pipe Insulation per system $ 39.88 $ 38.88 $ 37.88 R-80 Weatherization Shade screens-mobile 100 sq ft $ 824.31 $ 803.70 $ 783.10 R-81 Weatherization Shade screens-multifamily 100 sq ft $ 824.31 $ 803.70 $ 783.10 R-82 Weatherization Shade screens-single family 100 sq ft $ 909.36 $ 886.62 $ 863.89 Weatherization
* If SCPPA members desire to install measures that are not contained on the residential list, Synergy will provide a proposal for their implementation with the SCPPA member before implementation. Synergy will add these measures to the SCPPA price list as part of future SCPPA price list updates if the measure has perceived value for all SCPPA members.
Water - Outdoor
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1981 518
SCPPA - Synergy NonResidential Efficiency Services and Products List # Non-Residential Measures Technology Unit
Definition
Standard Unit
Price
Volumetric
Pricing (500 +
Annual
Installations)
Volumetric Pricing
(1,000 + Annual
Installations)
N-1 AC Tune-up (Refrigerant Charge, Condenser Coil Clean and Airflow) < 10 Ton Air Conditioning per ton $ 90.75 $ 88.48 $ 86.21 N-2 AC Tune-up (Refrigerant Charge, Condenser Coil Clean and Airflow) > 10 Ton Air Conditioning per ton $ 99.75 $ 97.75 $ 95.50 N-3 Brushless motor 1/2 HP per ton Air Conditioning per ton $ 184.94 $ 180.31 $ 175.69 N-4 Brushless motor 3/4 HP per ton Air Conditioning per ton $ 192.94 $ 188.11 $ 183.29 N-5 HVAC Efficient Fan Control Air Conditioning each $ 199.38 $ 194.40 $ 189.41 N-6 Programmable Thermostat Air Conditioning each $ 195.00 $ 190.13 $ 185.25 N-7 Smart Programmable Thermostat Air Conditioning each $ 389.00 $ 379.28 $ 369.55 N-8 Smart Programmable Thermostat w/SoCalGas Program Air Conditioning each $ 250.00 $ 243.75 $ 237.50 N-9 Energy and/or Water Audit (from basic to comprehensive analysis) Audits each $ 99 - 450 $ 94 - 429 $ 89 - 409 N-10 Minimum trip charge Fees per trip $ 99.00 Waived Waived N-11 ≤100W Area/Street Light 5000K Lighting each $ 595.00 $ 580.13 $ 565.25 N-12 ≤100W LED Gas Station Canopy Light 5000K Lighting each $ 495.00 $ 482.63 $ 470.25 N-13 ≤120W LED Canopy Light 5000K Lighting each $ 216.25 $ 210.84 $ 205.44 N-14 ≤13W LED Downlight (Recess) 4 lnch 5000K Lighting each $ 595.00 $ 580.13 $ 565.25 N-15 ≤150W Area/Street Light 5000K Lighting each $ 999.50 $ 974.51 $ 949.53 N-16 ≤200W LED Gas Station Canopy Light 5000K Lighting each $ 595.00 $ 580.13 $ 565.25 N-17 ≤22W LED Downlight (Recess) 6 lnch 5000K Lighting each $ 39.50 $ 38.51 $ 37.53 N-18 ≤30W LED Flood Light Lighting each $ 179.50 $ 175.01 $ 170.53 N-19 ≤35W LED Downlight (Recess) 8 lnch 5000K Lighting each $ 111.25 $ 108.47 $ 105.69 N-20 2 ft 2L U6 LED Retrofit Lighting each $ 69.50 $ 67.76 $ 66.03 N-21 2ft LED Flat Panel Retrofit Lighting each $ 149.50 $ 145.76 $ 142.03 N-22 3FT 1L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 79.95 $ 77.95 $ 75.95 N-23 3FT 2L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 99.95 $ 97.45 $ 94.95 N-24 4FT 1L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 69.50 $ 67.76 $ 66.03 N-25 4ft 1L LED New Fixture Lighting each $ 108.59 $ 104.59 $ 101.59 N-26 4FT 2L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 79.95 $ 77.95 $ 75.95 N-27 4ft 2L LED New Fixture Lighting each $ 189.50 $ 184.76 $ 180.03 N-28 4ft 2L LED Retrofit Kit and Elec. Ballast (8ft 1L retrofit) Lighting each $ 139.00 $ 135.53 $ 132.05 N-29 4FT 3L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 99.95 $ 97.45 $ 94.95 N-30 4ft 3L LED New Fixture Lighting each $ 210.00 $ 204.75 $ 199.50 N-31 4FT 4L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 109.00 $ 106.28 $ 103.55 N-32 4ft 4L LED New Fixture Lighting each $ 235.00 $ 229.13 $ 223.25 N-33 4ft 4L LED Retrofit Kit and Elec. Ballast (8ft 2L retrofit) Lighting each $ 149.00 $ 145.28 $ 141.55 N-34 4ft LED Panel Retrofit Kit New Fixture Lighting each $ 179.50 $ 175.01 $ 170.53 N-35 4ft Tube Guard Lighting each $ 9.00 $ 8.78 $ 8.55
N-36 8FT 1L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 86.88 $ 84.70 $ 82.53 N-37 8ft 1L LED New Fixture Lighting each $ 135.74 $ 130.74 $ 126.99 N-38 8FT 2L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 99.94 $ 97.44 $ 94.94 N-39 8ft 2L LED New Fixture Lighting each $ 236.88 $ 230.95 $ 225.03 N-40 8ft 2L LED Retrofit Kit and Elec. Ballast (8ft 1L retrofit) Lighting each $ 173.75 $ 169.41 $ 165.06 N-41 8FT 3L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 124.94 $ 121.81 $ 118.69 N-42 8ft 3L LED New Fixture Lighting each $ 262.50 $ 255.94 $ 249.38 N-43 8FT 4L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 136.25 $ 132.84 $ 129.44 N-44 8ft 4L LED New Fixture Lighting each $ 293.75 $ 286.41 $ 279.06 N-45 8ft 4L LED Retrofit Kit and Elec. Ballast (8ft 2L retrofit) Lighting each $ 186.25 $ 181.59 $ 176.94 N-46 8ft LED Panel Retrofit Kit New Fixture Lighting each $ 224.38 $ 218.77 $ 213.16 N-47 8ft Tube Guard Lighting each $ 12.00 $ 11.70 $ 11.40 N-48 Chandelier 3W LED Dimmable Candelabra Lighting each $ 14.95 $ 14.58 $ 14.20 N-49 Electronic Ballast (low/medium/high) Lighting each $ 49.50 $ 48.26 $ 47.03 N-50 Green or Red Photo luminescent Exit Sign (Double Sided) Lighting each $ 299.50 $ 292.01 $ 284.53 N-51 Green or Red Photo luminescent Exit Sign (Single Sided) Lighting each $ 150.00 $ 146.25 $ 142.50 N-52 HID to ≤100W LED Highbay 5000K (Warehouse) Lighting each $ 499.50 $ 487.01 $ 474.53 N-53 HID to ≤240W LED Highbay 5000K (Warehouse) Lighting each $ 699.50 $ 682.01 $ 664.53 N-54 Highbay T5 2L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 109.50 $ 106.76 $ 104.03 N-55 Highbay T5 3L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 125.00 $ 121.88 $ 118.75 N-56 Highbay T5 4L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 135.00 $ 131.63 $ 128.25 N-57 Highbay T5 6L LED Lamp and Elec. Ballast Plug-n-Play Lighting each $ 155.00 $ 151.13 $ 147.25 N-58 LED downlight, screw-in-lamp, 1-3 W, interior Lighting each $ 19.95 $ 19.45 $ 18.95 N-59 LED downlight, screw-in-lamp, 4-20 W, interior Lighting each $ 19.95 $ 19.45 $ 18.95 N-60 LED Open or Exit Sign-Green or Red Replacement Battery Back-up Lighting each $ 95.00 $ 92.63 $ 90.25 N-61 LED Wall Packs ≤100W LED Bulb Lighting each $ 349.50 $ 340.76 $ 332.03 N-62 LED Wall Packs ≤150W LED Wallpack High Power Lighting each $ 749.50 $ 730.76 $ 712.03 N-63 LED Wall Packs ≤200W LED Wallpack High Power Lighting each $ 899.50 $ 877.01 $ 854.53 N-64 LED Wall Packs ≤30W LED Wall Pack 5000K Lighting each $ 199.50 $ 194.51 $ 189.53 N-65 LED Wall Packs ≤60W LED Wall Pack 5000K Lighting each $ 399.50 $ 389.51 $ 379.53 N-66 LED Wall Packs ≤80W LED Wall Pack High Power Lighting each $ 399.50 $ 389.51 $ 379.53 N-67 LED Wall Packs ≤90W LED Wall Pack 5000K Lighting each $ 449.50 $ 438.26 $ 427.03 N-68 Lighting Controls Motion Sensors Lighting each $ 129.50 $ 126.26 $ 123.03 N-69 Lighting Controls with Daylight Harvesting Lighting each $ 139.50 $ 136.01 $ 132.53 N-70 PAR16 / MR16 to LED ≤10 W Lighting each $ 14.95 $ 14.58 $ 14.20 N-71 PAR16 / MR16 to LED 2-6 W Lighting each $ 14.95 $ 14.58 $ 14.20 Lighting
Small Commercial, Industrial, and Institutional Facilities Services and Products are calculated as an ALL-INCLUSIVE DIRECT-INSTALL PRICE (Includes Material, Labor, Marketing, Administration) Air Conditioning
Audits
Fees
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1982 519
N-72 PAR20 to LED 3-9W Lighting each $ 19.95 $ 19.45 $ 18.95 N-73 PAR30 to LED 7-19W Lighting each $ 19.95 $ 19.45 $ 18.95 N-74 PAR38 to LED 16-23W Lighting each $ 29.95 $ 29.20 $ 28.45 N-75 Replacement to ≤12W A-type LED Lighting each $ 14.95 $ 14.58 $ 14.20 N-76 Replacement to ≤12W Globe-Type LED Lighting each $ 19.95 $ 19.45 $ 18.95 N-77 Replacement to ≤7W Globe-Type LED Lighting each $ 14.95 $ 14.58 $ 14.20 N-78 Replacement to ≤9W A-type LED Lighting each $ 14.95 $ 14.58 $ 14.20 N-79 Replacement to ≤9W Globe-Type LED Lighting each $ 14.95 $ 14.58 $ 14.20 N-80 Refrigeration LED retrofit 4ft 1L LED (Low Temp) Lighting - Refrigeration each $ 199.50 $ 194.51 $ 189.53 N-81 Refrigeration LED retrofit 4ft 2L LED (Low Temp) Lighting - Refrigeration each $ 299.50 $ 292.01 $ 284.53 N-82 Refrigeration LED retrofit 5ft 1L LED (Low Temp) Lighting - Refrigeration each $ 224.50 $ 218.89 $ 213.28 N-83 Refrigeration LED retrofit 6ft 1L LED (Low Temp) Lighting - Refrigeration each $ 244.50 $ 238.39 $ 232.28 N-84 Refrigeration LED retrofit 7ft 1L LED (Low Temp) Lighting - Refrigeration each $ 399.50 $ 389.51 $ 379.53 N-85 Refrigeration LED retrofit 8ft 1L LED (Low Temp) Lighting - Refrigeration each $ 499.50 $ 487.01 $ 474.53 N-86 Commercial Grade Variable Speed Pool Pump Pumps and Motors each $ 2,750.00 $ 2,681.25 $ 2,612.50 N-87 Anti-Sweat Heat (ASH) Controls (or Humidistat Controls) Cooler Refrigeration each $ 779.50 $ 760.01 $ 740.53 N-88 Anti-Sweat Heat (ASH) Controls (or Humidistat Controls) Freezer Refrigeration each $ 25.00 $ 24.38 $ 23.75 N-89 Door Closer (pneumatic spring) Refrigeration each $ 249.50 $ 243.26 $ 237.03 N-90 Freezer Curtains Medium Per Square Foot Refrigeration Square Foot $ 14.95 $ 14.58 $ 14.20 N-91 Freezer Main Cooler Door Gaskets Low Temperature per Linear ft. Refrigeration Linear Foot $ 19.50 $ 19.01 $ 18.53 N-92 Heavy duty UV Refrigeration Pipe-Insulation Linear ft. Refrigeration each $ 19.50 $ 19.01 $ 18.53 N-93 Install Fan Controllers Refrigeration each $ 499.50 $ 487.01 $ 474.53 N-94 Refrigerant charge for refrigerators/freezers (up to 3 lbs) Refrigeration each $ 95.00 $ 92.63 $ 90.25 N-95 Refrigeration Curtains Medium Per Linear ft. Refrigeration each $ 14.95 $ 14.58 $ 14.20 N-96 Refrigerator Main Cooler Door Gaskets Medium Temperature per Linear ft. Refrigeration each $ 19.50 $ 19.01 $ 18.53 N-97 Replace Standard Fan Motors with Electronically Commutated Motors (ECM) (1/4 - 1 1/2 Hp) Refrigeration each $ 349.50 $ 340.76 $ 332.03 N-98 Replace Standard Fan Motors with Electronically Commutated Motors (ECM) (1/47 - 1/4 Hp) Refrigeration each $ 329.50 $ 321.26 $ 313.03 N-99 Split Systems w/Multiple Coils Tune-up Refrigeration each $ 99.50 $ 97.01 $ 94.53 N-100 Suction Line Insulation (per linear foot) Refrigeration each $ 9.25 $ 9.02 $ 8.79 N-101 Under Counter & Self Contained Tune-up Refrigeration each $ 245.00 $ 238.88 $ 232.75 N-102 Vending Machine Controls Refrigeration each $ 281.00 $ 273.98 $ 266.95 N-103 Walk-In Cooler Tune-up Refrigeration each $ 245.00 $ 238.88 $ 232.75 N-104 Walk-In Freezer Tune-up Refrigeration each $ 245.00 $ 238.88 $ 232.75 N-105 Dipper Wells Water - Indoor each $ 299.50 $ 292.01 $ 284.53 N-106 Dual Flush Retrofits Water - Indoor each $ 225.00 $ 219.38 $ 213.75 N-107 Faucet Aerators Water - Indoor each $ 9.95 $ 9.70 $ 9.45 N-108 Faucet Aerators - w/SoCalGas Program Water - Indoor each $ 5.00 $ 4.88 $ 4.75 N-109 Faucets Water - Indoor each $ 249.50 $ 243.26 $ 237.03 N-110 Flushometer retrofits Water - Indoor each $ 250.00 $ 243.75 $ 237.50 N-111 Premium High Efficiency Toilets (1.1 gpf or less) Water - Indoor each $ 495.00 $ 482.63 $ 470.25 N-112 Pre-Rinse Spray Valve Water - Indoor each $ 125.00 $ 121.88 $ 118.75 N-113 Pre-Rinse Spray Valve - w/SoCalGas Program Water - Indoor each $ 62.00 $ 60.45 $ 58.90 N-114 Repair Toilet Flapper Water - Indoor each $ 49.95 $ 48.70 $ 47.45 N-115 Shower Heads Water - Indoor each $ 42.50 $ 41.44 $ 40.38 N-116 Shower Heads - w/SoCalGas Program Water - Indoor each $ 21.00 $ 20.48 $ 19.95 N-117 Ultra Low Water Urinals (0.125 gpf or less) Water - Indoor each $ 499.50 $ 487.01 $ 474.53 N-118 Zero Water Urinals (0 gpf) Water - Indoor each $ 489.00 $ 476.78 $ 464.55 N-119 High Efficiency Sprinkler Heads Water - Outdoor each $ 24.50 $ 23.89 $ 23.28 N-120 Soil Moisture Sensors Water - Outdoor each $ 59.00 $ 57.53 $ 56.05 N-121 Weather Based Irrigation Controllers Water - Outdoor each $ 397.38 $ 387.44 $ 377.51 Lighting - Refrigeration
Pumps & Motors
Refrigeration
Water Efficiency - Indoor
Water Efficiency - Outdoor
DocuSign Envelope ID: 7B392C3F-7008-46BF-8A58-4AE87A36EC0E 1983 520
2 TASK ORDER NO: BEU-01-A-01
Date: May 23, 2023
Project Description: Commercial and Residential Direct Install Programs Participating Member: Banning Electric Utility (“Participant”) Consultant or Contractor: Eagle Systems International, Inc. DBA Synergy Companies (“Consultant” or “Contractor”)
This Task Order No. BEU-01-A-01 amends Task Order No. BEU-01, and is issued pursuant to the Master Professional Services Agreement between SCPPA and Consultant dated October 15, 2020, and as amended on December 16, 2021 ("Agreement"). Capitalized terms used but not defined herein shall have the meanings ascribed to them in the Master Professional Services Agreement ("Agreement") between SCPPA and Consultant dated October 15, 2020, and Amended on December 16, 2021.
Amendment to Task Order No. BEU-01
This Task Order No. BEU-01-A-01 shall amend the “Compensation and Schedule” provision in Task Order No. BEU-01 to read as follows:
Compensation and Schedule
This Task Order is effective from July 1, 2022 to October 15, 2023 with a not to exceed amount of $200,000. Consultant shall invoice BEU monthly, after completion of onsite energy assessments, installation of energy measures, and delivery of final reports to BEU and BEU customers.
Except as amended herein, all other terms and conditions of Task Order No. No. BEU-01 remain in full force and effect.
[SIGNATURE PAGE FOLLOWS]
DocuSign Envelope ID: 19F482EB-92C2-405E-875C-9DE6E538F16D 1975 521
2 IN WITNESS WHEREOF, the parties have signed this Task Order BEU-01-A-01 as of the date first written above.
SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY
By:
MICHAEL S. WEBSTER
Executive Director
Approved as to Legal Form:
ARMANDO ARBALLO
Assistant General Counsel
EAGLE SYSTEMS INTERNATIONAL, INC. DBA SYNERGY COMPANIES By:
MATTHEW CLARK
Vice President of Business Development
Participant’s Acknowledgement and Agreement
The undersigned hereby attests that he has the requisite authority to bind the Participant to the obligations set forth in this Task Order. Participant agrees to be responsible for any and all fees, costs and expenses invoiced to SCPPA by Consultant for work performed on behalf of, or for the benefit of, Participant pursuant to the Agreement.
Participant agrees to indemnify, defend and hold harmless SCPPA, all other members and their respective directors, officers, agents, representatives, employees, successors and assigns from and against any and all losses, injuries, costs and expenses, damages, liens, claims, or liabilities, including reasonable attorney’s fees, incurred by SCPPA in connection with the work performed for the benefit of, or on behalf of, Participant pursuant to the Agreement, except for the gross negligence or willful misconduct of SCPPA or such other SCPPA members, and their officers, agents, representatives or employees.
BANNING ELECTRIC UTILITY
By:
DOUG SCHULZE
City Manager
DocuSign Envelope ID: 19F482EB-92C2-405E-875C-9DE6E538F16D 1976 522
Synergy Companies is a City of Banning authorized contractor responsible for administering this program.
Schedule appointment with Synergy Companies.
Receive energy eciency upgrades to your home.
Enjoy the increased comfort and energy savings.
COMPANIES We Treat People Right™
Synergy
SYNERGY
ENERGY AUDIT
MEASURES
PARTICIPATING CONTRACTOR HOW TO PARTICIPATE
SCHEDULE
APPOINTMENT
SCAN ME
1-800-818-4298
visit synergycompanies.com
ENERGY
EFFICIENCY
SURVEY
Do you have high energy
bills? An energy eciency
survey can help you
determine how you can
lower energy usage and
increase comfort in your
business.
SMART
THERMOSTAT
Your HVAC uses about 44%
of your energy usage.
Upgrade to a Smart
Thermostat to help lower
cooling and heating
costs. A smart thermostat
also allows your to adjust
the comfort of your home
from anywhere your have
internet.
78 HVAC
OPTIMIZATION
Do your utility bills rise
during the winter and
summer months? Make
sure your heating and
cooling run eciently to
help lower energy usage
and increase the
longevity of the unit/s.
LED
LIGHTING
Do you feel like your room
uncomfortably heats up
when you turn on the
lights? Upgrading to LED
lamps and fixtures
reduce heat transfer and
energy consumption by
up to 75% compared to
older technology.
SMART
THERMOSTAT
Your HVAC uses about 44%
of your energy usage.
Upgrade to a smart
thermostat to help lower
cooling and heating
costs. Also control your
thermostat from an app
while on the go.
LED
LIGHTING
Do you feel like your
building heats up when
you turn on the lights?
Upgrading to LED lamps
and fixtures reduce heat
transfer and energy
consumption by up to
75% compared to older
technology.
HVAC
OPTIMIZATION
Do your utility bills rise
during the winter and
summer months? Make
sure your heating and
cooling run eciently to
help lower energy usage
and increase the
longevity of your unit/s.
78 COMMERCIAL
523
Synergy Companies is a City of Banning authorized contractor responsible for administering this program.
Schedule appointment with Synergy Companies.
Receive energy eciency upgrades to your home.
Enjoy the increased comfort and energy savings.
COMPANIES We Treat People Right™
Synergy
SYNERGY
ENERGY AUDIT
MEASURES
PARTICIPATING CONTRACTOR HOW TO PARTICIPATE
SCHEDULE
APPOINTMENT
SCAN ME
1-800-818-4298
visit synergycompanies.com
ENERGY
EFFICIENCY
SURVEY
Do you have high energy
bills? An energy eciency
survey can help you
determine how you can
lower energy usage and
increase comfort in your
business.
SMART
THERMOSTAT
Your HVAC uses about 44%
of your energy usage.
Upgrade to a Smart
Thermostat to help lower
cooling and heating
costs. A smart thermostat
also allows your to adjust
the comfort of your home
from anywhere your have
internet.
78 HVAC
OPTIMIZATION
Do your utility bills rise
during the winter and
summer months? Make
sure your heating and
cooling run eciently to
help lower energy usage
and increase the
longevity of the unit/s.
LED
LIGHTING
Do you feel like your room
uncomfortably heats up
when you turn on the
lights? Upgrading to LED
lamps and fixtures
reduce heat transfer and
energy consumption by
up to 75% compared to
older technology.
SMART
THERMOSTAT
Your HVAC uses about 44%
of your energy usage.
Upgrade to a smart
thermostat to help lower
cooling and heating
costs. Also control your
thermostat from an app
while on the go.
LED
LIGHTING
Do you feel like your
building heats up when
you turn on the lights?
Upgrading to LED lamps
and fixtures reduce heat
transfer and energy
consumption by up to
75% compared to older
technology.
HVAC
OPTIMIZATION
Do your utility bills rise
during the winter and
summer months? Make
sure your heating and
cooling run eciently to
help lower energy usage
and increase the
longevity of your unit/s.
78 MANUFACTURED HOMES
C
M
Y
CM
MY
CY
CMY
K
1 Page Flier MHP 11.01.2022 Print.pdf 3 11/1/22 1:11 PM 524
Synergy Companies is a City of Banning authorized contractor responsible for administering this program.
Schedule Appointment with Synergy Companies.
Receive energy eciency upgrades to your home.
Enjoy the increased comfort and energy savings.
COMPANIES We Treat People Right™
Synergy
SYNERGY
ENERGY AUDIT
MEASURES
PARTICIPATING CONTRACTOR HOW TO PARTICIPATE
SCHEDULE
APPOINTMENT
SCAN ME
1-800-818-4298
visit synergycompanies.com
ENERGY
EFFICIENCY
SURVEY
Do you have high energy
bills? An energy eciency
survey can help you
determine how you can
lower energy usage and
increase comfort in your
home.
LED
LIGHTING
Do you feel like your room
uncomfortably heats up
when you turn on the
lights? Upgrading to LED
lamps and fixtures
reduce heat transfer and
energy consumption by
up to 75% compared to
older technology.
LED
LIGHTING
Do you feel like your
home heats up when you
turn on the lights?
Upgrading to LED lamps
and fixtures reduce heat
transfer and energy
consumption by up to
75% compared to older
technology.
RESIDENTIAL
525
CITY OF BANNING
STAFF REPORT
TO: CITY COUNCIL
FROM: Douglas Schulze, City Manager
PREPARED BY: Nate Smith, Public Works Deputy Director
Art Vela, Director of Public Works
MEETING DATE: January 9, 2024
SUBJECT: Consideration of Resolution 2024-04, Adopting the Downtown Revitalization and Complete Streets Plan, Prepared by Alta Planning + Design, Inc., as a Set of Policies and Design Guidelines for the Downtown Area
RECOMMENDATION:
Adopt Resolution 2024-04, adopting the Downtown Revitalization and Complete Streets Plan, prepared by Alta Planning + Design, Inc., as a set of policies and design guidelines for the downtown area.
BACKGROUND:
Award of Consultant Contract
On June 22, 2021, the City of Banning was awarded a $297,461 Sustainable Communities Grant (SB-1 Grant) from the California Department of Transportation (Caltrans) to retain the services of an experienced and qualified transportation planning and engineering consultant to develop the Downtown Revitalization and Complete Streets (DRCS) Plan. Th DRCS is a planning document focused on the revitalization of the downtown area of Banning along with a Complete Streets Plan in the ½ mile project corridor on Ramsey Street, and bounded by: Hays Street (north limit), Livingston Street (south limit), Martin Street (east limit) and 8th Street (west limit), as shown in Attachment 3.
On August 24, 2021, the City Council adopted Resolution 2021-78, authorizing the City Manager to enter into an Agreement with Caltrans for the SB-1 Grant for the DRCS Plan. Local match funds in the amount of $38,539 were required and paid through Engineering Division staff time to manage, review, and approve the project and administer the Caltrans grant. Alta Planning + Design, Inc. was awarded the consultant contract through the approval of Resolution 2022-70 on June 14, 2022.
Complete Streets
Complete Streets are for everyone. Complete Streets is an approach to planning, designing, building, operating, and maintaining streets that enable safe access for all people who use them, including pedestrians, bicyclists, motorists, and transit riders of all ages and abilities. The project scope included considering the following factors:
Roadway reconfiguration/traffic circulation change (reduction of traffic lanes, reduction of parking, etc.)
Traffic signal improvements (accessible signals and pushbuttons, transit signal priority, queue jump signal, signal coordination, elimination of permissive left turns, pedestrian “all green” phases, 526
protected bicycle phases and other signal timing/phasing by modal priority, etc.) Shared streets (vehicle access restriction, raised street with pavers, bollards, etc.) Intersection improvements (signal phasing, signs and markings, vehicle turn movement restrictions)
Streetscape improvements (street lighting, landscape planting, public art, bicycle parking corrals, district and store signage, gateway signage, wayfinding signage, etc.) Bicycle lane improvements
Transit- only lanes (red pavement markings, signal modifications, etc.) Bus stop improvements (ADA access improvements, longer bus stops, transit shelters, trash cans, bicycle parking, wayfinding signage, etc.)
Pedestrian crossing improvements (crosswalk markings, flashing beacons, signals, curb extension “bulbouts”, etc.)
Parking zones (flexible, based on time of day, parking zones, hybrid paid commercial yellow loading zones, disabled blue parking zones, passenger white loading zones for private vehicles/ride-hailing, taxis, etc.)
E-Commerce zones for deliveries, perhaps flexible timing Traffic calming (speed bumps and/or tables, raised intersections, sidewalk “bulbouts”, etc.) Storm water management and greening elements were incorporated.
Revitalization Plan
To compliment the Complete Streets analysis, the DRCS Plan looked at the existing conditions and assets in the downtown corridor, and in coordination with project stakeholders and local property and business owners, developed a framework for downtown that included the following topics:
Zoning Recommendations
Parking Recommendations
Signage Programs
Economic Data
Alley reuse/activation
Event space
Stakeholder Participation
To create a successful DRCS Plan, the project team made meaningful connections with community members to ensure the DRCS Plan is relevant and impactful in their daily lives. The consultant prepared a Community Engagement Action Plan which was approved and implemented in order to provide outreach activities that included public participation and participation from key stakeholders to ensure the Plan’s concepts reflect the community’s needs and wishes. The outreach activities engaged local and regional representatives, and provided presentations covering the project background, goals, scope, preliminary and three preferred concepts, and obtained valuable feedback that led to the final selected alternative in the Plan.
Previous activities included community pop-ups at Banning High School, Nicolet Middle School, and Central Elementary School; ‘engagement days’ covering presentations to downtown business owners including a walking audit, stakeholder’s meetings, public Open House workshops, the Sun Lakes Country Club HOA, and at a Chamber of Commerce breakfast meeting, were held. Additionally, this project was advertised on social media, the City’s website and at community events hosted by the Active Transportation Plan (ATP) project team. Two online surveys were conducted to gather initial information and solicit important feedback.
The design team solicited feedback on three (3) project alternatives to identify preferences on the concepts presented to assist in the development of the final recommendations. Comments were incorporated from City staff members, the public, stakeholders, and the downtown business community to develop the final DRCS Plan. Three alternatives were presented to the Planning Commission on June 527
7, 2023 and City Council on June 27, 2023 to assist and provide feedback in the preparation of the final DRCS Plan. The final DRCS Plan is a roadmap for future implementation, containing a list of projects, cost estimates and potential grant opportunities. The results of the Community Outreach efforts are presented in detail in the Appendix to the DRCS Plan, Attachment 2.
Final Plan
The final plan reflects input provided throughout the community feedback phases, and takes the best concepts from each of the 3 project alternatives provided. Highlights included in the final plan include the following:
Transformation of Ramsey Street into a Complete Street, incorporating; wider sidewalks to accommodate pedestrians, outdoor dining, street vendors, event queuing; Class 2 and Class 4 bike lanes; dedicated and enhanced transit stops; loading and unloading flex spaces for business deliveries, on-demand rideshare and food pickup; pedestrian level lighting; enhanced wayfinding and public artwork spaces.
Narrowed roadways to discourage large vehicles and high speeds.
Chicane on Ramsey Street for passive traffic calming treatments.
Enhanced landscaping and storm water capture and treatment.
Activated alleyways to connect parking to businesses and residences, enhance business operations, provide additional off-street gathering areas.
Creating 1st Street as a flexible road by; elevating sidewalks to denote special status; allowing for parking and through access for primary business functions; ability to close off for special events and to create event space; enhanced landscape and hardscape architecture.
Proposing consolidated solid waste management to eliminate individual waste collection bins in the alleys.
Relocating the truck route from Ramsey Street to Livingston Street, around the downtown core.
Proposing increased usage of underutilized space.
Proposing a community pocket park.
Providing a financial analysis of the downtown area and community for use in recruiting new businesses to downtown.
Proposing enhanced community signage on Interstate 10.
Providing a toolkit for the implementation of a demonstration project.
Providing color/theme templates for wayfinding, including wayfinding and signage for transit and public parking.
Provide a basis for the desired type of development within the downtown study area.
Implementation
Adoption of the DRCS Plan will allow the City it in efforts to attract new business interests and to assist in obtaining grants for construction work within the public right of way. Additionally, the DRCS Plan will be referenced within the ongoing General Plan update allowing the City to use it for new developments and re-developments of parcels within the downtown zone. At Council's direction, roadway standards within this plan can be expanded outside the study zone (i.e. Ramsey Street from Martin Street to Alola Street).
The Public Works Department intends to seek grant funding to implement the improvements within the downtown plan, likely in a phased approach as funding allows. This process may take several years to come to fruition.
JUSTIFICATION:
This plan will help to provide City Staff, the community, existing business owners, and potential investors in downtown a shared vision to work towards implementing. It also will provide design goals and guidelines for the downtown area. The approval of Resolution 2024-04 by City Council is required in order to competitively apply for Federal and State grants, with the goal of receiving funds to implement 528
portions of the DRCS Plan over time.
FISCAL IMPACT:
This project was funded from a SB-1 grant provided from Caltrans that was previously accepted by Council on June 22, 2021. The City’s financial commitment is being met by utilization of staff time with Engineering Division staff administering the grant in house. Adoption of the resolution does not make any additional financial obligations to the City at this time.
Any City Council requested changes to the document may require new and additional appropriations.
The contract has been exhausted and deliverable made consistent with the projects scope of work.
ALTERNATIVES:
1. Adopt Resolution 2024-04, as recommended.
2. Adopt Resolution 2024-04, with modifications. City Council may request staff to make revisions to the DRCS Plan.
3. Do not adopt Resolution 2024-04. Without approval of DRCS Plan, the City would be ineligible for grant opportunities that requires such approval.
ATTACHMENTS:
1. Resolution 2024-04, Downtown Complete Streets Plan.docx
2. Exhibit A - Part 1: DRCS Final Plan.pdf
3. Exhibit A - Part 2: DRCS Final Appendix.pdf
4. Project Location Map.pdf
529
Resolution 2024-04
RESOLUTION 2024-04
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BANNING, CALIFORNIA,
ADOPTING THE DOWNTOWN REVITALIZATION AND COMPLETE STREETS PLAN (DRCS), PREPARED BY ALTA PLANNING + DESIGN, INC, AS A SET OF POLICIES AND DESIGN
GUIDELINES AFFECTING THE DOWNTOWN AREA
WHEREAS, on June 22, 2021, the City of Banning was awarded a $297,461 Sustainable Communities Grant (SB-1 Grant) from the California Department of Transportation (Caltrans) to retain the services of an experienced and qualified transportation planning and engineering consultant to develop the Downtown Revitalization and Complete Streets Plan with a required City match of $38,539; and;
WHEREAS, on August 24, 2021, the City Council adopted Resolution 2021-78, authorizing the City Manager to enter into an Agreement with Caltrans for the SB-1 Grant of $297,461 for the DRCS Plan and local match funds were paid through Engineering Division staff time to manage, review and approve the project and administer the Caltrans grant; and WHEREAS, on June 14, 2022, the City Council adopted Resolution 2022-70, awarding the consultant contract for the DRCS Plan to Alta Planning + Design, Inc.; and, WHEREAS, the Scope of Work included the review of existing conditions and assets in the Downtown corridor, and included the preparation and development of a DRCS Plan with the preferred concept developed after extensive public participation; and, WHEREAS, the final DRCS Plan is a roadmap for future implementation; containing a list of projects, cost estimates, and associated potential grant opportunities, and it will guide future design by providing design policies in the Downtown area.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Banning as follows:
SECTION 1. The City Council adopts the Downtown Revitalization and Complete Streets (DRCS) Plan, prepared by Alta Planning + Design, Inc., as a set of policies and design guidelines affecting the Downtown area.
SECTION 2. The City Clerk shall certify the adoption of this resolution and shall cause a certified resolution to be filed in the book of original resolutions.
PASSED, APPROVED AND ADOPTED this 9th day of January, 2024.
Alberto Sanchez, Mayor
City of Banning
530
Resolution 2024-04
ATTEST:
Caroline Patton, Administrative City Clerk
City of Banning
APPROVED AS TO FORM AND
LEGAL CONTENT:
Serita R. Young, City Attorney
Richards, Watson & Gershon
531
Resolution 2024-04
CERTIFICATION:
I, Caroline Patton, Deputy City Clerk of the City of Banning, California, do hereby certify that the foregoing Resolution 2024-04, was duly adopted by the City Council of the City of Banning, California, at a regular meeting thereof held on the 9th day of January 2024 by the following vote, to wit:
AYES:
NOES:
ABSENT:
ABSTAIN:
Caroline Patton, Deputy City Clerk
City of Banning, California
532
Resolution 2024-04
EXHIBIT A
Downtown Revitalization and Complete Streets Final Plan and Appendices 533
BANNING
DOWNTOWN REVITALIZATION
& COMPLETE STREETS PLAN
Final Plan
November 2023
PREPARED BY:
Alta Planning + Design
The Arroyo Group
RCLCO
1534
Existing Conditions & Engagement ����������������������� 4 Concept Themes ��������������������������������������������������� 44 Final Concept �������������������������������������������������������� 82 2 TABLE OF CONTENTS
© 2023 California Department of Transportation and the City of Banning. All Rights Reserved.535 3536
4 EXISTING CONDITIONS &
ENGAGEMENT
City Overview ��������������������������������������������6 Introduction 8
Previous Planning 9
Design Standards Review 9
Demographics Analysis 10
Land Use 11
Live-Work 12
Traffic and Collision Data 13
Transit - Fixed Route 14
Transit - Dial-A-Ride (DAR) 15
Major Trip Generators 15
Urban Design
Downtown Revitalization�������������������������16
District Assets 18
Opportunity Sites 20
District Inventory - 8th St to 4th St 22
District Inventory 4th St to San Gorgonio Ave 24
Complete Streets �������������������������������������34 Parking In Downtown Banning 36
Community Engagement�����������������������38
Round 1 - Initial Engagement 40
Round 2 - Concepts Theme Feedback 42
537
5538
6 CITY OVERVIEW
This section provides background information about existing demographics, land use, transportation, collisions, and commuting that help inform the larger picture of Banning and how the downtown revitalization and complete streets will function within it.
539
7540
Introduction
Near the northwestern edge of Riverside County, the City of Banning, California has approximately 30,000 residents in its 23 square miles. The downtown study area, spanning approximately 0.6 miles in length includes Ramsey Street from 8th St Street to Martin Street.
Downtown Banning is primarily comprised of aging establishments and quick-service restaurants and is characterized by high vacancy rates. Despite these existing challenges, Ramsey Street’s central location, history, and underlying human-scale attributes present significant opportunity for revitalization. Due to proximity to the I-10 highway, many of the existing visitors in Banning are commuters and through-travelers making quick stops. This location however provides an opportunity for Banning to grow and attract visitors that live in the San Gorgonio Pass Area as the eastern portion of Riverside County.
Figure 1. Banning City Boundary and Study Area
Ramsey Street
Livingston Street
Hays Street
Martin Street
8th Street
I-10
8 541
Previous Planning
The City of Banning has plans and policies which support the goals of the Downtown Revitalization and Complete Streets Plan, including the General Plan. The City of Banning completed the General Plan in 2006, and updated the Circulation Element in 2011. The General Plan encourages mixed-use land uses downtown, and also allows for hotels and motels. The General Plan states that residents want a livable city in which there is clustered housing, interior parks and trails, and adequate sidewalks. The Circulation Element also identifies downtown as an important area for sidewalks and bikeway development for safety reasons and economic reasons.
According to the General Plan, commercial development in Banning is focused on Ramsey Street but has remained small due to lot configuration, parking requirements, and multiple small lot ownerships. At the time of writing the General Plan, a Redevelopment Project Area which included downtown existed in which tax revenues and bonds were available to finance projects within the Area. Banning adopted an Economic Development Strategy in 1999 in order to accomplish a series of economic strategies in Redevelopment Areas. The Redevelopment Agency headed these projects, which mostly consisted of housing projects; however, in 2011 the State of California eliminated Redevelopment Agencies. Soon after in 2012 the Banning City Council voted to name the Banning Housing Authority to take over housing assets.
The Core Area of Businesses and Merchants Association (CABAM) was created in 2004 as a subcommittee of the Chamber of Commerce. The CABAM met regularly to discuss local businesses and how to increase development, particularly along Ramsey Street. At the time of writing the General Plan, the core of the freeway-oriented commercial development was a group of fast food restaurants near 22nd St Street on Ramsey Street.
Design Standards Review
The Circulation Element of the General Plan was updated in 2011 and defines Ramsey Street as an arterial street from Highland Springs Avenue to Malki Road. The Plan defines an arterial as a roadway with 4-6 lanes that connect residential, shopping, employment, and recreational activities. The Plan recommends a focus on bikeways and pedestrian pathways along the City’s arterial streets.
9542
Demographics Analysis
The average household income in Banning in 2021 was just under $64,000, far below the average household income of $87,000 in the San Gorgonio Pass Area, and $96,000 in Riverside County.
Banning households skew older, with 48.2% of households over the age of 65, compared to 35.7% in the San Gorgonio Pass Area, and 27.4% in all of Riverside County. Within the downtown study area, residents are younger compared to the rest of Banning, but the median household income is the lowest in the city and households are growing slower than other parts of Banning.1 The CalEnviroScreen tool is used to identify communities that face disproportionate pollution burdens compared to other census tracts in the state. The state of California considers census tracts that score higher than 75% to be disadvantaged. The CalEnviroScreen results show that most of the study area is in the 79th percentile, however to the immediate northeast, north of the I-10 highway the percentile is higher. These results show that the Downtown study area is a disadvantaged community. These pollution levels are likely from the traffic on the I-10 highway. Diesel trucks release exhaust which contains hundreds of chemicals, including many that are harmful to health and can cause problems like eye, throat, and nose irritation, heart and lung disease, and lung cancer.2 In the most heavily burdened census tract in downtown Banning, there are 0.432 tons of diesel particulate matter released per year, which is higher than 87% of other census tracts in the state.
Per CalEnviroScreen, housing-burden households in California are both low-income and burdened by housing costs. In the most heavily burdened tract downtown, 26% of people are housing burdened. Residents facing these housing challenges can suffer mental health impacts.
The Public Health Alliance of Southern California also has a tool which considers public health aspects like income, education, housing conditions, and environmental conditions. The Health Places Index (HPI) tool measures these aspects and compares census tracts to others in the state.
Per the HPI tool, downtown Banning has healthier community conditions than only 2.5% of other California cities. In the HPI tool, downtown Banning scores particularly low in economic, educational, and transportation areas.
Almost half of all traffic to existing downtown Banning establishments originates from within Banning, meaning the businesses do not attract patronage from outside of the city.3 The businesses that do attract commuters are largely the fast food chain restaurants that are placed near the I-10 exit ramps. Collectively, Jack in the Box, Vape Town, IHOP, and Wing’s Garden Cafe drive nearly half of all traffic in downtown Banning. Despite being immediately adjacent to Interstate-10, the census block groups that comprise Banning, and those immediately bordering the city, account for approximately 46% of all visitors to the Downtown Banning area.4 1 ESRI, RCLCO
2 CalEnviroScreen 4.0.
3 SafeGraph, ArcGIS, RCLCO
4 SafeGraph, ArcGIS, RCLCO
Figure 2. Cal EnviroScreen 4.0
10 543
0%
5%
10%
15%
20%
25%
Local
Restaurant
Fast
Casual
Auto
Parts
General
Merchandise
Fast
Food
Theaters Grocery Clothing &
Accessory
Stores
Liquor
Store
Service
w/ Retail
Component
10%
11%
12%
15%
16%
25%
4%
2% 2%
1%
Land Use Figure 3. Land Use
Downtown Banning has limited multifamily housing options. The City has not developed new multifamily rental properties in over twenty years, and currently only has 471 market-rate multifamily rental units. Since 2020 there has been a surge of development permits issued in the city, but most of these permits were issued for single family structures.5 5 U.S. Department of Housing and Urban Development, RCLCO 11544
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization | (WORKING DRAFT) R1-15403.02 | August 26, 2022 THE MAJORITY (88%) OF BANNING RESIDENTS WORK OUTSIDE OF THE CITY, WITH A SIGNIFICANT PORTION (55.4%) COMMUTING GREATER THAN 25 MILES TO WORK. HIGHER-DENSITY BUSINESS CORES ALONG INTERSTATE-10, SAN
BERNARDINO, RIVERSIDE, AND PALM SPRINGS ARE KEY EMPLOYMENT CENTERS FOR BANNING RESIDENTS
INFLOW/OUTFLOW JOB COUNTS COUNT SHARE
Employed in the Selection Area 5,466 100%
Employed in the Selection Area but Living Outside 4,025 73.6% Employed and Living in the Selection Area 1,441 26.4%
Living in the Selection Area 12,277 100%
Living in the Selection Area but Employed Outside 10,836 88.3% Living and Employed in the Selection Area 1,441 11.7%
Work Patterns, 2019
Banning
Employment Locations of Residents, 2019
Banning and Surrounding Southern California
COMMUTE DISTANCE OF BANNING RESIDENTS COUNT SHA
TOTAL PRIMARY JOBS 12,277 100
Less than 10 miles 3,160 25.7
10 to 24 miles 2,317 18.9
25 to 50 miles 3,055 24.9
Greater than 50 miles 3,745 30.5
Downtown Banning Source: Census on the Map; Esri; R
10 Miles
25 Miles
50 Miles
MAP KEY
Jobs/Sq. Mile
202 – 392
86 – 201
27 – 85
5 – 26
1 – 4
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization | (WORKING DRAFT) R1-15403.02 | August 26, 2022 | 14 THE MAJORITY (88%) OF BANNING RESIDENTS WORK OUTSIDE OF THE CITY, WITH A SIGNIFICANT PORTION (55.4%) COMMUTING GREATER THAN 25 MILES TO WORK. HIGHER-DENSITY BUSINESS CORES ALONG INTERSTATE-10, SAN
BERNARDINO, RIVERSIDE, AND PALM SPRINGS ARE KEY EMPLOYMENT CENTERS FOR BANNING RESIDENTS
INFLOW/OUTFLOW JOB COUNTS COUNT SHARE
Employed in the Selection Area 5,466 100%
Employed in the Selection Area but Living Outside 4,025 73.6% Employed and Living in the Selection Area 1,441 26.4%
Living in the Selection Area 12,277 100%
Living in the Selection Area but Employed Outside 10,836 88.3% Living and Employed in the Selection Area 1,441 11.7%
Work Patterns, 2019
Banning
Employment Locations of Residents, 2019
Banning and Surrounding Southern California
COMMUTE DISTANCE OF BANNING RESIDENTS COUNT SHARE
TOTAL PRIMARY JOBS 12,277 100%
Less than 10 miles 3,160 25.7%
10 to 24 miles 2,317 18.9%
25 to 50 miles 3,055 24.9%
Greater than 50 miles 3,745 30.5%
Downtown Banning Source: Census on the Map; Esri; RCLCO 10 Miles
25 Miles
50 Miles
MAP KEY
Jobs/Sq. Mile
202 – 392
86 – 201
27 – 85
5 – 26
1 – 4
Live-Work
The majority (88%) of Banning residents work outside of the city, many commuting greater than 25 miles to get to work. Employment centers for Banning residents are mainly in San Bernardino, Riverside, and Palm Springs. Only 1,440 people both live and work in Banning. Nearly 75% of employees in the city commute into Banning. The largest employers in Banning are the Banning Unified School District, the San Gorgonio Memorial Hospital, the Smith Correctional Facility and the Banning Justice Center.6 6 City of Banning; Riverside County; Census on the Map; ESRI; RCLCO Figure 4. Commuting Patterns
0 10
20 30
40 50
Healthcare
and Education
Retail,
Hospitality, and
Other Services
Manufacturing
and Logistics
Professional
Services
Government
4%
8%
14%
29%
44%
12 545
Traffic and Collision Data Figure 5. Cyclist and Pedestrian Crashes 2010-2021 Data uploaded by the California Highway Patrol and local law enforcement agencies into the Statewide Integrated Traffic Records System (SWITRS) from 2010-2021 shows that bicyclist and pedestrian crashes in Downtown Banning are mostly concentrated along 8th St Street, where posted traffic speeds are 35mph. Several crashes have also occurred on Ramsey Street and Livingston Street. Most of the crashes downtown resulted in a pedestrian injury, however, there have also been three cyclist injuries, two of which happened at the same intersection of 8th St and Williams, and the other by 8th St and the I-10 EB entrance ramp.
Two pedestrians have been killed in crashes just outside of the study area on the I-10 highway and on George Street near the middle school and elementary school. It is worth noting that this data is a partial view of pedestrian and bicyclist involved collisions as these crash types are historically underreported. Additionally, this data does not account for near misses or areas where pedestrians and cyclists avoid due to real or perceived dangers. In the city of Banning, there were 82 crashes involving either pedestrians or cyclists. 7 (8.5%) of these 82 crashes were within the downtown boundary bound by 8th Street at the west, Hays Street at the north, Martin Street at the east, and Livingston Street at the south. Injuries are most likely related to speed of vehicles coming to and from the highway on 8th Street due to wide streets that encourage speeding. Other injuries can be attributed to crossings and street conditions that lack high visibility and signage.
Additional information regarding crashes and safety in Banning is identified in the 2022 Local Road Safety Plan. For the 427 city wide crashes between 2017 and 2021, they are categorized by location based on proximity to intersections. Crashes that occurred within the 250 feet sphere of influence of an intersection are counted as intersections versus outside of that sphere are counted as roadway segments. 65% (279)crashes occurred at unsignalized intersections and only 16% (67) and 19% (81) occurred at signalized intersections and roadway segments respectively. In an effort to reduce crashes and improve safety a number of programs and projects outlined in the plan relate to the study area. As part of the federal-aid Highway Safety and Improvement Program (HSIP) Grant, traffic signals on Ramsey Street between Hargrave Street and Sunset Street were upgraded in 2018. These included controllers, pedestrian pushbuttons, signals hardware, new mast arms, detection, and installation of Emergency Vehicle Pre-Emption Devices. Four of the unsignalized intersections along Ramsey Street, Martin Street, 2nd Street, 6th Street and 16th Street were selected for pedestrian crossing improvements via HISP Grant in 2021. 15 mph Cyclist Injury
Pedestrian Injury
Pedestrian Killed
25 mph
35 mph
45 mph
13546
MARTIN
Figure 6. Bus Routes and Stops
These improvements include rectangular rapid flashing beacons (RRFBs), enhanced crosswalk striping, and Americans with Disabilities Act (ADA)-compliant curb ramps. 7 Transit - Fixed Route
The City of Banning’s Short Range Transit Plan (2021) outlines Banning’s Transit service including Banning Connect services. Transit routes 1, 5, and 6 travel through Downtown Banning connecting to services and retail. In the City there are 14 bus shelters with intent to add shelters to the bus stops that do not have one. The City is also exploring other locations for stops with shelters.
Route 1 – Beaumont/Banning/Cabazon Route 1 is among the most used route in the system, operating along Ramsey Street and serving the commercial area Beaumont (Walmart), residential areas of Cabazon and Casino Morongo, and the outlet malls in Cabazon. Ridership on Route 1 accounts for approximately 72% of the total use of the system. While the longest in distance, this route operates on an one-hour headway from Beaumont to Casino Morongo.
The major stops on this line include Albertsons, Wal-Mart, Banning City Hall, Mid-County Justice Center, Social Services offices in Banning, San Gorgonio Memorial Hospital, Casino Morongo and the Desert Hills Outlets in Cabazon. The second loop of Route 1 also runs on an hour headway departing from Casino Morongo and servicing the Cabazon Community Center and the residential areas of Cabazon. Two buses are operated on this route which allows for hourly service to the two respective areas.
Route 5 – Northern Banning Route 5 accounts for 17 percent of Banning’s Transit System use, providing service to the areas that lie north of the I-10 Freeway in the City of Banning.
Major stops on this route are the Mid-County Justice Center, Banning City Hall, the Banning Community Center, Library, Medical Facilities, San Gorgonio Memorial Hospital and the commercial area of Beaumont (Walmart).
Route 6 – Southern Banning Accounting for 11% of Banning’s transit system’s use, Route 6 provides service to the southern area of Banning. Major stops on this route are the Mid-County Justice Center, Banning City Hall, the Mt. San Jacinto Pass Campus, Banning High School, Smith Correctional Facility, Medical Facilities, San Gorgonio Memorial Hospital and the commercial area of Beaumont (Walmart).
7 City of Banning Local Road Safety Plan August 2022 Report 14 547
Transit - Dial-A-Ride (DAR)
The transit plan also outlines the Dial-A-Ride service offered to seniors, aged 60 and older, persons with disabilities and passengers eligible under the Americans with Disabilities Act (ADA). In accordance with ADA requirements, DAR operates during the same time frames as the local fixed routes for ADA clients. Limited service hours are available for non-ADA passengers from 6:00am to 6:45pm on weekdays and 8:00am to 4:45pm on the weekends.
ADA passengers are also required to fill out a certification application to determine eligibility. If terms are met, the applicant receives a card certifying their eligibility to ride.
The primary uses for the Dial-A-Ride system are transportation to medical appointments, workshop programs for persons with disabilities, shopping areas, and employment. Diala-Ride services also provide connections to the RTA, Sunline, and Banning and Beaumont fixed routes. Additionally, demand for paratransit is expected to grow. This is a universal transit/paratransit theme nationwide and Banning is anticipated to continue to see growth in the paratransit program. The savings in administrative costs mentioned above in the fixed route section also applies to DAR and like fixed route the COVID-19 pandemic has drastically impacted ridership numbers and fare box revenue in the end of 2019/2020 fiscal year and continues to impact ridership currently.
Major Trip Generators
Major passenger trip destinations that the Banning transit system services are the Sun Lakes Plaza Shopping Center, the Walmart Supercenter in Beaumont, the Banning Justice Center, San Gorgonio Pass Hospital, Beaver and Loma Linda Medical Plazas, the Cabazon Outlet Stores, Desert Hills Premium Outlets and Casino Morongo and the Mt. San Jacinto College San Gorgonio Pass Campus. There is a high demand for service to these destinations whether for employment, necessities or pleasure.
Figure 7. Major Trip Generators
Retail/Entertainment
Government/Higher Education
Medical
15548
16 URBAN DESIGN
DOWNTOWN REVITALIZATION
This section presents an urban design analysis of Downtown Banning which aims to understand how people interact with and experience the area.
Each topic is discussed on a different page, with goals derived from the physical, aesthetic, and regulatory frameworks of successful downtowns in similarly-sized cities. Assets for a district are features that attract people to an area and/or contribute to its identity and character. Building around existing assets is a key strategy to facilitate revitalization and ensure that it proceeds in a manner that is authentic to Banning’s history and character. 549
17550
1 2 3
18 Fox Cineplex is D’Place The Station Taphouse Bar and Grill Jitterz Coffee at The Haven District Assets
EXISTING DESTINATIONS
Existing destinations are those uses which currently attract a significant number of people, as determined by field observations and cell phone visit data obtained by RCLCO (see market analysis appendix for more information). City Hall, Central Elementary School and Banning Village Market are examples of destinations of necessity, while the Fox Theater and Station TapHouse Bar and Grill are examples of leisure destinations, or destinations of choice where people come for a particular experience. Several of the uses which attract the largest number of people are destinations which contain uses or structures not compatible with a downtown urban design setting. These “pass-through assets” are more likely to be visited for a short period of time, with on-site parking leading to a “grab and go” type of experience which provides less opportunities to capture greater amounts of visitor time and expenditure. Examples are Jack in the Box (22% of total downtown visits) and Parts Authority, an auto parts store which is the highest sales tax generator in the area.
GOOD QUALITY BUILDINGS
The City of Banning was incorporated in 1913, and much of the building fabric of Downtown dates from the years prior to World War II, when development in the American Main Street tradition was at its peak. This town-building tradition, which incorporated various architectural styles, prioritized one and two-story storefront buildings which open onto sidewalks and engage the street with transparent windows, creating a human scale and pedestrian orientation which enriched their downtowns as districts. The Haven building, a large two-story brick building with a clock tower at the corner of Ramsey Street and San Gorgonio Avenue, is the most prominent example of this; however, other structures throughout can be found, including the block of San Gorgonio Avenue between Hays and Williams Streets, which also includes newer structures built in the main street tradition.
GOALS
• Identify, highlight and promote Downtown’s existing assets within the urban fabric
• Use existing assets as a guide for the future vision, identity and branding of the Downtown
• Identify buildings which contribute to the pedestrian experience of Downtown
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization | (WORKING DRAFT) The retail visitor analyses were performed utilizing data from SafeGraph which provides a sample of cell phone data for over 18 million places of interest (POIs) where the cell phone was located for at least four minutes. ► The graph below shows that the most visited locations within Downtown Banning are Jack in the Box (22%), Vape Town (10%), IHOP (9%), and Wing’s Garden Cafe (8%). Collectively, these four establishments are driving nearly half (49%) of all traffic in the Downtown Banning area.
► The graph to the right displays the home location of visitors to the Downtown Banning area. For the most part these visitors stem from the immediate Banning area and parts of nearby Cabazon, Cherry Valley, Beaumont and the outlying communities of the San Gorgonio Pass Area.
► Despite being immediately adjacent to Interstate-10, the census block groups that comprise Banning, and those immediately bordering the city, account for approximately 46% of all visitors to the Downtown Banning area.
Map of Estimated Visit Percentage by Retailer - 2022
Downtown Banning
ESTIMAT
>21
≤1
Map of visits to downtown businesses as captured by cellular data (see market review appendix) Figure 8. Downtown Business Visitation
551
19 SAN GORGON OI
6TH
5TH
4TH
3RD
6TH
R
A
M
S
E
Y
8TH
W
I
L
L
I
A
M
S
FAY
2ND
1ST
7TH
ALESSANDRO
L
I
V
I
N
G
S
T
O
N
H
AY
S
MURRAY
4TH
I
1 0
I
1 0
I
1 0
I
1 0
H
AY
S
J
A
C
I
N
T
O
V
I
E
W
MARTIN
J
O
H
N
B
RYA
N
T
2.5-Min Walk (660’)
5-Min Walk (1320’)
1 2
3 Downtown Assets
Pass-Through Assets
Specific Plan Area
Walking Radius 5 min (1320’)
W RAMSEY ST
W WILLIAM ST E WILLIAM ST
W HAYES ST E HAYES ST
N 8TH ST
N 7TH ST
N 6TH ST
N 5TH ST
N 4TH ST
N 3RD ST
N 2ND ST
N 1ST ST
N SAN GORGONIO AVE
N ALESSANDRO AVE
MARTIN ST
S 8TH ST
S 6TH ST
S 4TH ST
S 3RD ST
S 2ND ST
S 1ST ST
S SAN GORGONIO AVE
E RAMSEY ST
BRYANT ST
BRYANT ST
I-10 I-10
I-10
Figure 9. District Asset Map
552
1 2 3
20 Repurpose Potential (Banning Hotel
today and historically, when it
advertised a cafe)
Vacant lot next to Boys and Girls Club Redeveloped but unoccupied Opportunity Sites
Opportunity sites are parcels of land, outside the public right-of-way, which have the opportunity to be developed into something which can benefit the district – new ground-up development, open space, or parking/transportation facilities. Opportunity sites also include existing structures which have the opportunity to be reused in a different way which could bring additional benefit to the district.
VACANT LOTS
A significant number of vacant lots are located throughout the Downtown on almost every block, contributing to the sense of economic stagnation and reducing walkability in the area.
CITY-OWNED OPPORTUNITY SITES
The City controls many sites whose development it can incentivize through land writedowns or other means, for catalytic development with potential public benefit elements (e.g. open space, affordable housing, public parking).
REPURPOSE POTENTIAL (GOOD QUALITY BUILDING)
Some good-quality structures are partially or fully unoccupied and present opportunities to be leased for uses that bring economic activity to the Downtown. Examples include the commercial space in the historic 199 W Ramsey St mixed-use building, which fronts on an entry plaza and could be used for a restaurant or other public-facing use, and the vacant, recently renovated office building at 66 N 1st St.
OFF-STREET PARKING LOTS
As described on page 34, there are over 1,200 parking spaces available in Downtown Banning, including a perpendicular and diagonal on-street parking along most of the northsouth streets in the central downtown area. The presence of these public resources could allow off-street parking lots to redevelop into new uses, “filling in” the downtown and creating a more walkable environment. Elimination of minimum parking requirements should be considered to encourage private investment in these spaces.
Goals
• Bring vacant properties into productive uses that contribute to creating a vibrant Downtown • Catalyze the development and vibrancy of the overall Downtown with development on key opportunity sites
553
21 SAN GORGON OI
6TH
5TH
4TH
3RD
6TH
R
A
M
S
E
Y
8TH
W
I
L
L
I
A
M
S
FAY
2ND
1ST
7TH
ALESSANDRO
L
I
V
I
N
G
S
T
O
N
H
AY
S
MURRAY
4TH
I
1 0
I
1 0
I
1 0
I
1 0
H
AY
S
J
A
C
I
N
T
O
V
I
E
W
MARTIN
J
O
H
N
B
RYA
N
T
2.5-Min Walk (660’)
5-Min Walk (1320’)
3 2
1 Vacant Lots
Underutilized Parcels
Repurpose Potential (good quality building)
Publicly Owned Opportunity Site
Off-Street Parking Lots
On-Street Opportunity
Specific Plan Area
Walking Radius 5 min (1320’)
W RAMSEY ST
W WILLIAM ST E WILLIAM ST
W HAYES ST E HAYES ST
N 8TH ST
N 7TH ST
N 6TH ST
N 5TH ST
N 4TH ST
N 3RD ST
N 2ND ST
N 1ST ST
N SAN GORGONIO AVE
N ALESSANDRO AVE
MARTIN ST
S 8TH ST
S 6TH ST
S 4TH ST
S 3RD ST
S 2ND ST
S 1ST ST
S SAN GORGONIO AVE
E RAMSEY ST
BRYANT ST
BRYANT ST
I-10 I-10
I-10
3 554
1 2 3
22 I-10 Serving fast food restaurants Underutilized parking lots Vacant lot 4th and Ramsey St District Inventory - 8th St to 4th St
OVERALL CHARACTER:
•The western end of the corridor (8th and Ramsey) is characterized by a busy, vehicular-focused intersection connecting to downtown’s only direct connection to I-10. Fast-food restaurants, a drug store, and a gas station surround the intersection and provide a service point for regional visitors. The Riverside County Office of Social Services and Greyhound Bus station are also located in this segment on the south side of Ramsey between 4th and 6th with a building footprint of .68 acres.
•Limited signage and identity markings and nondescript suburban development hide the presence of the downtown core just to the east. Visitors from I-10 especially are presented with almost no cues to direct them toward downtown.
•A scattering of varied business types and land uses, varied setbacks from the street frontage and breaks in development diminish the sense of a cohesive and visually connected downtown experience.
LAND USES:
•This area contains several of the most visited destinations in the study area: Jack in the Box (22%), Vape Town (10%), IHOP (9%). These popular businesses have been classified as Pass-through Assets within our analysis to further consider in the planning effort and distinguish from the more pedestrian-focused, walkable assets in other core areas of the downtown. •Three (3) completely vacant lots face Ramsey, located on both sides of the corridor. Vacant sites have been classified as Opportunity Sites within this analysis for potential future development consideration. •The northern side of Ramsey is characterized by a scattering of single restaurant businesses, other small commercial developments, and single-family residential units fronting directly on the corridor.
PARKING:
•Several large parking lots are located on the southern edge of the corridor, serving the existing fast-food restaurants and social services building. From visual observation, the lots appear largely underutilized during non-peak business times. Parking lots have been classified as Opportunity Sites within this analysis for potential future development consideration.
POTENTIAL RELATIONSHIP TO THE OVERALL DOWNTOWN DISTRICT:
•Because this is the only area of downtown with direct connection to / from I-10 east and west, this area will likely play an important role as a gateway/ connector into the downtown. The ability to attract more guests to downtown from the outside will play an important part in revitalizing downtown Banning. •While addressing critical pedestrian and bicycle safety issues is an important need, urban design should also address welcoming and arrival into downtown from a vehicle.
555
23 Greyhound Bus
Station
Riverside County
Department Public CBD The Wellness Generation
Bella Vista Cottages
and Apartments
Mountain View Estates Trailer
Park Community Papaya Bay
Reynaldo’s
Music and Voice
Institute
Cancer
Federation
Snowballs and
Snacks
IHOP Jack in the
Box
Santiago’s
Taco Shop
Banning
Donuts
2.5-Min Walk (660’)
5-Min Walk (1320’)
S 6TH ST
S 4TH ST
S 8TH ST N 8TH ST
N 4TH ST
W RAMSEY ST
I-10
W RAMSEY ST
Vacant Lots
Underutilized Parcels
Repurpose Potential (good quality building)
Publicly Owned Opportunity Site
Downtown Assets
Off-Street Parking Lots
On-Street Opportunity
Specific Plan Area
Walking Radius 5 min (1320’)
2 3
1 Pass-Through Assets
Access from I-10 West
Entrance to Downtown
12,250’ - 5 Min Walk
556
1 2 3
24 Ramsey Street sidewalk and
storefronts Downtown branded lightpole Downtown alley next to Fox Theater District Inventory 4th St to San Gorgonio Ave
OVERALL CHARACTER:
•The central segment of the Ramsey corridor, between 4th St and San Gorgonio Ave, is characterized by the densification of commercial businesses and the beginning of an evenly set back, continuous storefront frontage. As Ramsey moves toward San Gorgonio the corridor really begins to feel like a true, walkable downtown ‘Main Street’. The area feels like the one of the most pedestrian-active parts of the downtown district and walkable within a 5-minute walk range of the Ramsey/San Gorgonio intersection.
•Some street trees do exist along Ramsey but there are big gaps in spacing and many of the trees are not performing well in the urban conditions. The hot streetscape conditions during daytime hours limit the overall use and walkability of the district. Opportunities for providing regularly spaced street trees and shading will be worth further study and consideration to help make the district more pedestrian friendly and walkable.
•No existing outdoor dining or business streetscape usage observed along Ramsey. Finding opportunities to further activate downtown streetscapes with programming, especially programming aligned to adjacent business usage will be important to further explore. A system of placemaking, art, lighting, district branding, signage and wayfinding will offer additional layers to help activate Ramsey, largely absent within the current conditions. •A system of alleyway spaces connect along Ramsey and provide back-of-house access and operations for downtown businesses. Alleyways connect to a variety of off-Ramsey development conditions and spaces. Utilizing these secondary connections will help create a richer range of downtown connectivity and a network of new explorable downtown spaces and programming.
LAND USES:
•This area contains several locally popular destinations including: Fox Theater, Jitterz Coffee, The Station TapHouse Bar and Grill, KK Market, and the Boys and Girls Club. These popular businesses have been classified as Assets within our analysis to consider how we may further build around them as part of preparing planning concepts.
•Several sites have existing buildings that are in good condition and may be suitable candidates to focus on for potential repurposing. These sites have been classified as Opportunity Sites within this analysis for potential consideration in developing planning concepts.
•A large, City-owned vacant plot at the SE corner of 3rd St and Ramsey offers a unique redevelopment opportunity, one that could add a significant new spark to a downtown core that begins to wane westward along Ramsey St, past 2nd St. This would be a great opportunity to extend the energy of the downtown core and fill in some development gaps existing along Ramsey.
This would be a site the City also doesn’t have to rely on a 3rd party property owner or developer to complete key long-term planning objectives; the City could undertake development themselves, or find a development partner, and in turn help catalyze other development to follow. The City has expressed interest in creating a park for this property. Completing a comprehensive planning process will inform how this property whether park or other use will help complement a full downtown vision. With its larger size and proximity to the downtown core, there are likely a range of development typologies and open space types that could be suitable options for this space. 557
25 2.5-Min Walk (660’)
Wings Garden
Cafe
Set Free Thrift
Store
Elegant Affair
Wedding venue
Boys and Girls
Club
Banning
Smog & Auto
Repair
Parts
Authority
Ramsey Villa
Apartment Fitness
Lounge
Jitterz
Coffee
T-Mobile
Banning Art
Gallery
Angels Black
Tiger Martial
Arts Studio LA’s Nothing Over Nine
Ninety
KK Market Fox
Cineplex is
D’Place Superior
Banning Tech Know
Barber Shop
The Station Taphouse
Bar and Grill
2.5-Min Walk (660’)
5-Min Walk (1320’)
W RAMSEY ST
N 3RD ST
N 2ND ST S 2ND ST
S 1ST ST N 1ST ST
S 4TH ST
S 3RD ST
N 4TH ST
Vacant Lots
Underutilized Parcels
Repurpose Potential (good quality building)
Publicly Owned Opportunity Site
Downtown Assets
Off-Street Parking Lots
On-Street Opportunity
Specific Plan Area
Walking Radius 5 min (1320’)
Pass-Through Assets
S SAN GORGONIO AVE N SAN GORGONIO AVE
Access from S San Gorgonio Ave 2 3
1 558
1 2 3
26 Carpenter Hamilton Park Historic Coplin House Connection to Downtown from Courthouse
District Inventory - San Gorgonio Ave to Martin St
OVERALL CHARACTER:
•The City Hall park and Historic Coplin House on the northeast and southeast corners, respectively, of San Gorgonio and Ramsey, enclose the intersection and connect this area to the downtown core to the west.
•East of City Hall, however, Ramsey Street opens up to two lanes eastbound, and one cross-street is missing (former Murray Street), giving the street more of a high-speed character. This sense is heightened because of the vacant lot on the south side of the street and auto sales/parking lot uses on the north side between Alessandro Street and Martin Street.
LAND USES:
•The district is dominated by a 3-4 acre vacant city-owned lot occupying the majority of the south frontage of Ramsey. The lot has excellent visibility from I-10 and has garnered development interest from hotel operators and affordable housing developers. It may represent one of the only opportunities to create a development of sufficient size to create its own environment in support of the downtown. •City Hall, the Banning Police Department and the Riverside County Courthouse just east of the downtown boundary are significant employers and destinations; increasing utilization of downtown by employees and visitors to these destinations presents an initial opportunity. •The park connecting City Hall to the San Gorgonio/Ramsey Street intersection is shady and has plenty of seating, but it feels hidden from the corner and thus does not function as a downtown amenity.
PARKING:
•There is a large amount of public parking on the east and west sides of San Gorgonio Avenue between Ramsey and Livingston. These parking areas are underutilized, in part because they lack district and site signage indicating that they are public lots.
Potential Relationship to the Overall Downtown District:
A significant new hotel or housing development on the City-owned lot could turn this district into a newer civic/mixed-use complement to the downtown core, feeding people toward the retail uses that predominate to the west.
The area could function as an eastern gateway to Downtown. 559
27 alk (660’)
Banning Police
Dept
Jitterz
Coffee
T-Mobile Socal Gas
Banning Art
Gallery
Angels Black
Tiger Martial
Arts Studio
LA’s Nothing
Over Nine
Ninety
Fox
Cineplex is
D’Place Superior
Banning Tech Know
Barber Shop
The Station Taphouse
Bar and Grill
Banning Civic
Center
2.5-Min Walk (660’)
5-Min Walk (1320’)
S SAN GORGONIO AVE N SAN GORGONIO AVE
N ALESSANDRO ST
MARTIN ST MARTIN ST
E RAMSEY ST W RAMSEY ST
Williams Vacant Lots
Underutilized Parcels
Repurpose Potential (good quality building)
Publicly Owned Opportunity Site
Downtown Assets
Off-Street Parking Lots
On-Street Opportunity
Specific Plan Area
Walking Radius 5 min (1320’)
Pass-Through Assets
S 1ST ST N 1ST ST
Access from S San Gorgonio Ave
KK Market
2 1 3
560
1 2 3
28 Repplier Park Aquatic Center Banning Native American Center Banning Village Market District Inventory - N San Gorgonio Ave
OVERALL CHARACTER:
• While outside the current study area boundary, this area exhibits some of the most walkable and pleasant downtown qualities in the City. Buildings mostly engage the street and are occupied, some street trees are growing well, and land uses which serve daily needs keep the area active.
LAND USES:
• Significant local destinations in the area include Central Elementary School, Banning Village Market (the primary market for central Banning) and the Dorothy Ramon (San Manuel Band of Serrano Indians) Learning Center; these are categorized as Assets within our analysis. • Local service uses, such as gyms, salons and storefront offices, predominate in smaller storefronts, maintaining the area with a reasonable amount of activity. The west side of San Gorgonio between Hays and Williams has a continuous line of street-facing buildings which have also been categorized as Assets.
• Vacant lots and parking areas on the east side of the street present opportunities for development, possibly of downtown housing typologies.
PARKING:
•The City recently constructed a public parking lot with electric vehicle chargers on the east side of the street.
POTENTIAL RELATIONSHIP TO THE OVERALL DOWNTOWN DISTRICT:
• This area forms a neighborhood-serving, walkable corridor which connects downtown to the market and school as well as the recreational facilities within walking distance a few blocks north. It could highlight San Gorgonio’s role as a local, multimodal cross-axis intersecting with the more regional corridor of Ramsey Street.
561
29 2.5-Min Walk (660’)
La Carreta
Dulceria
Dorthy Ramon
Learning Center
Rise Above
Boxing Academy
McClellen Wilson
and Patterson
Flamingo’s
Event Planner
Central
Elementary
School Banning Village
Market
N SAN GORGONIO AVE
W WILLIAMS ST E WILLIAMS ST
Extreme Hair
Salon
Elvira’s Boutique
Protein Garden
Super Subs
2.5-Min Walk (660’)
5-Min Walk (1320’)
Vacant Lots
Underutilized Parcels
Repurpose Potential (good quality building)
Publicly Owned Opportunity Site
Downtown Assets
Off-Street Parking Lots
On-Street Opportunity
Specific Plan Area
Walking Radius 5 min (1320’)
Pass-Through Assets
N ALESSANDRO ST
N 2ND ST
N 1ST ST
W HAYS ST E HAYS ST
MARTIN ST
3 2
1 562
1 2 3
30 Cluster #1 - Ramsey & San Gorgonio
Intersection Cluster #3 - Large Vacant Plot
along East Ramsey Cluster #4- Redeveloped but some unoccupied Area of Interest
FIVE AREAS OF INTEREST ARE IDENTIFIED ON THE MAP AT RIGHT:
Near the intersection of Ramsey and San Gorgonio – This area is the center of downtown, with existing entertainment-oriented businesses including the Fox Theater. It presents the clearest opportunity to build upon assets to revitalize downtown.
Ramsey near 4th and 3rd Streets – This area presents a number of opportunity sites, including a potential open space next to the Boys and Girls Club. New development and open space could complement social service uses.
City-Owned Large Development Site – The large development site is a unique opportunity to build a new section of downtown, connected to City Hall, to complement the historic downtown core. Development will need to abide by Surplus Land Act rules which “is a “right of first refusal” law that requires all local agencies to offer surplus land for sale or lease to affordable home developers and certain other entities before selling or leasing the land to any other individual or entity.” 1
San Gorgonio North – This area also has cultural, educational and recreational assets and a pleasant street character. The area could be strengthened in its function as a neighborhood corridor connecting downtown to residential areas further north. 8th St and Ramsey – This area is an important arrival point to the city and vehicular gateway to downtown.
1 California Department of Housing and Community Development 1 2
3 4
5 563
31 2.5-Min Walk (660’)
5-Min Walk (1320’)
N SAN GORGONIO AVE S SAN GORGONIO AVE
W RAMSEY ST
W WILLIAM ST E WILLIAM ST
W HAYES ST E HAYES ST
N 8TH ST
N 7TH ST
N 6TH ST
N 5TH ST
N 4TH ST
N 3RD ST
N 2ND ST
N 1ST ST
N ALESSANDRO AVE
MARTIN ST
S 8TH ST
S 6TH ST
S 4TH ST
S 3RD ST
S 2ND ST
S 1ST ST
E RAMSEY ST
BRYANT ST
BRYANT ST
I-10 I-10
I-10
Vacant Lots
Underutilized Parcels
Repurpose Potential (good quality building) Publicly Owned Opportunity Site Downtown Assets
Off-Street Parking Lots
On-Street Opportunity
Specific Plan Area
Walking Radius 5 min (1320’)
Upgraded Street Connections Pass-Through Assets 14
2 5
3 564
1 2 3
32 To
Downtown
Banning
Potential
Bridge
Treatments
To
Downtown
Banning
Potential
Focal
Element
To
Downtown
Banning
Potential
Bridge
Treatments
Potential
Focal
Element
SIGNAGE
Signage leading to Downtown Banning is needed in multiple locations including along the I-10 mainline, at the end of the freeway exits at 8th Street and Hargrave Street, and along San Gorgonio Avenue.
REORIENTATION OF CIRCULATION
The lack of direct freeway access to Downtown Banning at San Gorgonio Avenue is a significant constraint to economic development in the area.
When I-10 was first constructed, exiting motorists traveling eastbound connected to a one-way Bryant Street and came to an intersection at San Gorgonio; motorists traveling westbound connected to a one-way Livingston Street, similarly coming to intersect San Gorgonio. In the long term, working to reestablish this street pattern would strengthen the position of Downtown Banning (although it would negatively effect 8th Street and Hargrave Street). It would also provide motorists traveling south toward Idyllwild a direct connection to CA Route 243.
GOALS:
•Increase visibility, recognition and access to Downtown Banning for passthrough I-10 travelers •Provide clear gateways into and out of Downtown, identifying it as a unique district
I-10 East Bound Freeway Exit at 8th St I-10 West Bound Freeway Exit at 8th St San Gorgonio Ave North Bound over I-10 Access and Gateways
Despite being an area which is recognizably different from most of the suburban-style development in nearby communities, Downtown Banning is almost entirely unmarked, unrecognizable and difficult to access for the millions of travelers who pass by it on I-10 annually. The area is not even signed for Banning residents who access it from local streets.
Currently, nearly half of retail visits to downtown derive from Banning itself, and the majority of other visitors come from nearby communities such as Beaumont and Cabazon.
Nevertheless, increasing visibility of downtown from I-10 gives the district the opportunity to tap into the spending power of the approximately 134,000 daily drivers (2017, Caltrans) which travel along the interstate highway.
FOCAL ELEMENTS
Focal elements could be landscaping, decorative walls, pylons, public art, etc. which announce arrival or directions to the downtown.
BRIDGE TREATMENTS
Potential bridge treatments could include “Downtown Banning” murals painted on the side of I-10 overpasses or treatments underneath the bridge, such as murals or lighting, which improve the active transportation experience into Downtown. 565
33 SAN GORGON OI
6TH
5TH
4TH
3RD
6TH
RAMSEY
8TH
WILLIAMS
FAY
2ND
1ST
7TH
ALESSANDRO
LIVINGSTON
HAYS
MURRAY
4TH
I 10
I 10
I 10
I 10
HAYS
JACINTO VIEW
MARTIN
JOHN
BRYANT
2.5-Min Walk (660’)
5-Min Walk (1320’)
District Access and Gateways Map.
Access to Western Banning and Beaumont
W RAMSEY ST
W WILLIAM ST E WILLIAM ST
W HAYES ST E HAYES ST
N 8TH ST
N 7TH ST
N 6TH ST
N 5TH ST
N 4TH ST
N 3RD ST
N 2ND ST
N 1ST ST
N SAN GORGONIO AVE
N ALESSANDRO AVE
MARTIN ST
S 8TH ST
S 6TH ST
S 4TH ST
S 3RD ST
S 2ND ST
S 1ST ST
S SAN GORGONIO AVE
E RAMSEY ST
BRYANT ST
BRYANT ST
I-10 I-10
I-10
Access to Central Elementary School,
Nicolet Middle School, Banning Aquatic
Center and Nature Area
Access to Eastern Banning and
I-10
Access to Banning High School
and Nature Area
134K ADT
1 2
3 Gateway
Potential Additional FreewayOriented Signage Zone
Access
District Marker and Identification
Specific Plan Area
Walking Radius 5 min (1320’)
LIVINGSTON ST
566
34 COMPLETE STREETS
Ramsey Street serves as Banning’s Downtown Main Street supported by adjacent parallel streets of Hays and Livingston, north and south respectively. Running perpendicular to these are 4th St- 1st St from west to east respectively as well as San Gorgonio, Alessandro St and Martin St. 8th St at the west of the study area connects to interstate 10 and is a major gateway to the study area. The following section outlines the existing conditions of these streets, addressing the challenges of varied right-of-way segments, missing pedestrian elements, and constrained conditions that do not meed ADA requirements. Many opportunities in these few streets exist for improving accessibility, safety, and comfort for non automobile users, and elevating the daily experience of traveling along Ramsey Street or patronizing its storefronts. Opportunity also exists to reconsider the distribution of parking downtown in order to re-distribute the public right-of-way for assets such as wider sidewalks, street trees, and bicycle facilities, while still maintaining access for those visiting or living in Banning to experience downtown.
567
35568
0 25 50 100
Feet
N 4th
S 6th
N 8th S 8th
S 4th
Livingston
W Ramsey
13 25
19 1
20 9
4 101
44 41
9 4
4 19
8 6
5 6
3.5 4
3 5
1 2 1 1 1 2 2 1 1
2 3 6
6 3
4 4
22 8
8 6
19 On Street
2.40 0.32
0.18 0.20
0.01 2.07
Off Street
Angled
Perpendicular
Commercial loading 30 min max.
Passenger loading-5 min max.
Private
Public
Parallel- Not Marked
Short term parking
1.50 4.70 496
129
71 39
3 57
420
Total Off Street 6.10
8.90 Acres
Number
of Spaces
Total All Parking
Total On Street 590
625
1,215
Parking In Downtown Banning
In downtown Banning there are over 1,215 parking spaces of on-street and off-street combined. Close to 1/3 of these are private off street lots, but still might be used by those parking downtown due to relatively loose and sometimes ill defined use. 129 off street spaces are public, with 101 of them located in the 1.4 acre lot shared by the Riverside Department of Public Social Services and the Greyhound Bus Station. The other 28 are on the west side of San Gorgonio between Livingston Street and Ramsey Street. These parking spaces were counted as both existing formal spaces with striping, as well as all spaces where no formal markings exist, but parking is happening. Many spaces that are unmarked are on streets with vacant lots and were counted to get the general quantity of potential space if all land use were built-out. An average of 18’ for parallel spaces was used to calculate number of approximate spaces available, rounding down to the nearest whole number.
There are 590 total on-street spaces. All 39 perpendicular spaces are on South 1st Street, while the 71 angled spaces are on 1st Street, 2nd Street, and 3rd Street. 480 parallel spaces are spread out throughout the downtown. 57 of them being short term green curb spaces and 3, yellow loading spaces. On-Street Parking on Ramsey Street on one side or both could be eliminated to make more room for pedestrian and active transportation infrastructure as the number of potential available spaces on the north side of Livingston Street alone could offset all of the spaces on Ramsey Street and is only one block from shop fronts. Businesses also have parking behind stores but it is often crumbling and overgrown. Resurfacing these lots and making them safe and accessible at all times of day as well as easily connected via sidewalks and alleys will allow patrons to continue to access stores without dealing with traffic on Ramsey. Parking throughout downtown needs to be formally marked with signage and striping so drivers easily can tell if they can park or not, and also prevent vehicles from parking in odd positions causing a chain reaction of lower numbers of vehicles along a street. 1st 2nd 3rd 4th 8th
Number Of On-Street
Parking By Type
32 19 12 20 17
35 6th
17 Alessandro
9 Hays
101
Livingston
99 Martin
49 Ramsey
118
San Gorgonio
39 22 Angled
Parallel
Perpendicular
Sum of NumSpaces by StreetAdjacent and AngledPerpParallel 1st 2nd 3rd 4th 6th Alessandro Hays Livingston Martin Ramsey San Gorgoni...
StreetAdjacent
0 50
100
Sum of NumSpaces
32 19 20 12 17
35.5 17 9
101 99
49 118.5
22 39
Sum of NumSpaces by StreetAdjacent
1st 2nd 3rd 8th Livingston Ramsey San Gorgoni...
StreetAdjacent
0 100
200
300
Sum of NumSpaces
79 79
35 6 28
370
28 1st 2nd 3rd 8th Livingston Ramsey San Gorgonio
79 79
35 6 28
370
28 Number Of Off-Street Parking by Access Street
Public Parking With Lack of Signage/
Lack of Markings for Street Parking
0 25 50 100 US Feet
0 25 50 100
Feet
S 6th
N 8th S 8th
Livin
13 25
19 44
41 9
4 4 19
8 6
3 5
1 2 1 1 1 2
2 19
On Street
2.40 0.32
0.18 0.20
0.01 2.07
Off Street
Angled
Perpendicular
Commercial loading 30 min max.
Passenger loading-5 min max.
Private
Public
Parallel- Not Marked
Short term parking
1.50 4.70 496
129
71 39
3 57
420
Total Off Street 6.10
8.90 Acres
Number
of Spaces
Total All Parking
Total On Street 590
625
1,215
36 569
N 4th
N 3rd
N 1stN San Gorgonio S San Gorgonio
N AlessandroMartin St Martin St
N 2nd
S 4th
S 3rdN 2nd
S 1st
E Ramsey
Livingston
ngston
W Ramsey
1 20 9
4 14
14 15
27 19
7 101
21 9
30 4.5
3 7 4 1
3 4
5 7
3 5
7 6
1 3
6 5
3 19 13
8 11 10
8 3
8 3
1 10
2 5
35 12
10 9 9
28 4
5 6
3.5 4
5 6 6
6 5
5 11 12 6 4
2 2 1 1
3 6
4 2 2 4 4 2
3 4
6 3
4 2
4 3 5
6 5
4 5
22 1 1
11 6
8 11
8 6
9 3 8 4 9 1 8
2 8
3 3
9 3
1 3
5 1
8 13
2 3 4
5 10
6 6 16 13
Lack of Markings for Parking Unclear Ownership and Use
of Lots Behind Businesses
Street Treated As Parking Lot Public Parking With Lack of Signage Uncertain Parking Allowance on Livingston
Angled Parking On Wide Streets Angled Parking On Wide Streets Short Term Parking Near
Police Station Street Turned Into Parking Lot
37570
38 COMMUNITY ENGAGEMENT
Engagement with members of the community is a vital part of the design process and helped the project team guide decisions for how best to implement the desires of the community. Throughout the project there were several engagement events with community and stakeholder groups both to gain initial insights and later to get feedback on several design concept themes.
571
39572
Round 1 - Initial Engagement
In Person Events
The initial engagement took place on October 27th, 2022 at a number of places throughout the day. These included: Downtown Business owners Ad Hoc Committee, Banning High School, Nicolet Middle School, Central Elementary School, and a Community Workshop Meeting at City Hall. At these different locations the project team gave presentations and heard valuable feedback from community members.
Collecting feedback happened with the aid of display boards with information on topics including: Urban Design, Development Experience, and Street Safety and Transportation.
Urban Design
The community showed interest in slow streets, programmed alleys, bike parking as well as active street terrace, green stormwater management, shade, and outdoor gathering. There were a few dislikes marked on the board, including active street terrace with elements like barrels and furniture, as well as outdoor gathering space which might relate to the concern of unhoused people downtown voiced by some.
Development and Experience
Participants were excited about street festivals, public parks and open space, farmer/flea markets, outdoor movies and night attractions. Initial findings also showed interest in mixed use development to offer spaces for residential and livework studios downtown.
Street Safety and Transportation
Street improvements focusing on pedestrian and cyclist safety were supported with speed and making space for all users being a top priority. All ages shared this sentiment but even more so from students who mentioned the desire for a safer route from schools to Downtown to meet up after school.
Example engagement board from initial day
40 573
Round 1 - Initial Experience Survey
Throughout the duration of the project in addition to in person engagement there were two online surveys which allowed for the community to provide input on the project. The first survey had 250 complete responses and asked general questions about their use of downtown amenities they might like to see in Downtown Banning.
TIME SPENT DOWNTOWN?
77% of people visit downtown because they live here and time spent downtown was 51% for less than one hour, 13% for a few hours, 5% for most of the day, and 30% for I do not visit downtown.
HOW OFTEN DO YOU WALK, BIKE, OR TAKE TRANSIT DOWNTOWN?
52% of respondents never use non-vehicular modes downtown while 20% do a few times per month. less than monthly and a few times a week both had 12%, and 2.5% used non-vehicular modes everyday.
WHAT WOULD MAKE YOU FEEL MORE COMFORTABLE OR SAFER WALKING, BIKING, ROLLING, OR TAKING TRANSIT DOWNTOWN? PLEASE CHOSE TOP 3.
Respondents ranked safer crossing infrastructure (crosswalks, pedestrian signals, etc.), and pedestrian lighting as most desired to make nonauto mobility more comfortable. Wider sidewalks, seating, shade and bicycle parking were also desired to a lesser degree. Less cars on the street, bus stops with more amenities, and more affordable transit options ranked lowest. Some write-ins for the Other category included:
“More businesses that were family friendly, everything is catered to low income”, Businesses like food restaurants, clothing stores, modernizing downtown area like Fullerton or Brea” “Less transients” “Stores to Shop” and “diagonal parking, like on State Street in Redlands to slow down motorists and make Ramsey more ‘pedestrian friendly’”.
WHICH OF THE FOLLOWING STREETSCAPE AMENITIES WOULD YOU LIKE TO SEE IN DOWNTOWN BANING? PLEASE CHOSE TOP 3.
Respondents wanted lighting, outdoor dining, green landscaping and shade as their most desired elements. Seating, plaza/meeting space, public art and city monument/gateway are moderately desired, while pocket parks, hydration stations, wayfinding, pedestrian-only alleys are the least ranked.
GENERALLY, WOULD YOU BE WILLING TO LOSE PARKING SPACE OPTIONS IN DOWNTOWN BANNING IF IT MEANT WALKING AND BIKING FACILITIES WERE IMPROVED?
53% responded yes, 41% no and 5% other including comment about building a parking structure.
Engagement announcement for first round of engagement in October and a link to survey
41574
Round 2 - Concepts Theme Feedback
The second engagement day took place on May 17th, 2023. The day included a presentation at the Chamber of Commerce Sunrise Breakfast, walk audit with Downtown business owners, and two workshop sessions, one for business owners followed by a community open house. The three concepts presented were: The Spark, Park & Play, and Gradient, which illustrated various design and placemaking treatments.
Results from the workshops (below) showed that the community preferred The Spark concept with Park & Play and Gradient vying for the 2nd favorite in different instances. See appendix for additional details.
Look & Feel
Streetscape & Mobility
The Spark (8 Votes)
Park & Play (2 Votes)
Gradient (1 Vote)
Public Realm/Open Space
& Placemaking
The Spark (9 Votes)
Park & Play (2 Votes
Gradient (0 Vote)
Land Use
The Spark (2 Votes)
Park & Play (1 Vote)
Gradient (2 Votes)
Ramsey & San Gorgonio
The Spark (9 Votes)
Park & Play (5 Votes)
Gradient (1 Vote)
Alleys
The Spark (9 Votes)
Park & Play (2 Votes)
Gradient (1 Vote)
Shared Streets
The Spark (4 Votes)
Park & Play (1 Vote)
Gradient (5 Votes)
Complete Street Design
Land Use and Open Space
Overall
The Spark (4 Votes)
Park & Play (5 Votes)
Gradient (0 Votes)
Dev Site #3- Social Services
The Spark (1 Vote)
Park & Play (4 Votes)
Gradient (0 Votes)
Dev Site #2- Civic Center
The Spark (2 Votes)
Park & Play (4 Votes)
Gradient (1 Vote)
Dev Site #1- SE Lot
The Spark (2 Votes)
Park & Play (2 Votes)
Gradient (2 Votes)
Mobility
The Spark (4 Votes)
Park & Play (2 Votes)
Gradient (1 Vote)
Gateways
The Spark (6 Votes)
Park & Play (0 Votes)
Gradient (1 Vote)
Complete Street design boards
Land use and open space board- The Spark
Mobility- The Spark
Gateways- The Spark
Full maps for drawing and comments- The Spark
42 575
Round 2 - Concept Themes Survey
The second survey presented the design concept themes of The Spark, Park & Play and Gradient. The survey had 127 complete responses. Participants could rank their choices for each using the photo simulation vignettes to give a sense of what that theme could look like. Out of the seven categories all categories besides, Look & Feel, had The Spark as the first choice with almost 50% or over 50% of respondents choosing it.
Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Main Street Survey Results
Which Main Street Concept Do You Like Most?
Rank 1-3, most to least.
Spark Park & Play Gradient
Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: bb2a138f-9db7432196621ca02cb20904, Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: bb2a138f-9db7432196621ca02cb20904, Look & Feel Survey Results
Spark Park & Play Gradient
Which Streetscape and Mobility Elements Do You Like Most? Rank 1-3, most to least.
Example of survey result which shoes The Spark at almost 50% or over 50% Look & Feel was the only category which didn’t have a clear first choice 43576
44 CONCEPT THEMES
Concept Design Themes�������������������������������������� 46 Three Concepts 47
The Spark 48
Park & Play 50
Gradient 52
Mobility and gateways ���������������������������������������� 54 Concepts 55
Access and Gateways 56
Concepts 57
Land Use & Open Space�������������������������������������� 58 Concepts 59
Existing Downtown Framework 60
Park & Play 64
Gradient 66
Look and Feel ������������������������������������������������������� 68 Color Palettes�������������������������������������������������������� 76 Small Town Charm 78
Scenic 80
577
45578
46 CONCEPT DESIGN THEMES
Three distinct themes were investigated to bring varied character to the corridor. A design theme is a unifying and recurrent idea which is made clear through recognizable elements such as patterns, forms, colors, textures and materials. 579
1: The Spark
3: Gradient
Three Concepts
RESTORE DOWNTOWN AS THE HEART OF
THE COMMUNITY
GREAT HUBS, ACTIVE SPACES
LIVE/WORK BANNING; BLURRING THE
LINES
2: Park & Play
47580
The Spark
RESTORE DOWNTOWN AS THE HEART OF THE
COMMUNITY
Key Design Moves
• Mobility: More traditional main street with balance of parking and protected bike lanes.
• Land Use: Traditional, mixed-use downtown with development focused on core of downtown with infill on north-south streets and reuse of existing structures.
• Open Space: A network of narrow, historic inspired back-alley pedestrian paseos to be looped to connect a collection of new open spaces like court yards and shared street and key downtown businesses.
Figure 10. Communal Alleyway
48 581
Figure 11. 1st St and Ramsey Shared Street
49582
Park & Play
GREAT HUBS, ACTIVE SPACES
Key Design Moves
• Mobility: Wide shared use sidewalk on main street allows users that park off of Ramsey to access downtown. Roundabouts at 4th and Martin slow traffic into downtown.
• Land Use: Combination of residential and mixed-use with entertainment attractors and a hotel to provide place for play and activities for local residents and visitors.
• Open Space: Playful elements on widened main street and alleys. Expanded Civic Center park connects to new land uses in downtown.
Figure 12. Playful Alleyway
50 583
Figure 13. 1st St and Ramsey Shared Street
51584
Key Design Moves
• Mobility: Tree lined boulevard main street with protected bike lanes and shared streets.
• Open Space: Streets and alleys filled with stormwater green infrastructure.
Flexible park space at Civic Center.
• Land Use: Live/work housing and small scale commercial/industrial land uses blend into commercial and more traditional residential from south to north through downtown.
Gradient
LIVE/WORK BANNING; BLURRING THE LINES
Figure 14. Green Infrastructure Alleyway
52 585
Figure 15. 1st St and Ramsey Shared Street
53586
54 MOBILITY AND GATEWAYS
Three mobility concepts were created to explore how combinations of Complete Streets elements would work together to provide safe access to and within Downtown for pedestrians and cyclists. The Appendix provides more details on these mobility concepts with diagrams and precedent imagery of mobility elements.
Similarly, the exploration of gateway alternatives considered how residents and visitors would know where Downtown began when coming from the interstate or other parts of town.
587
1: The Spark
3: Gradient
RESTORE DOWNTOWN AS THE HEART OF
THE COMMUNITY
GREAT HUBS, ACTIVE SPACES
LIVE/WORK BANNING;
BLURRING THE LINES
Concepts
2: Park & Play
55 Spark
Class IV
8 6
8 12
Class IVClass IV
Class II/IIB
Shared Use SIdewalk
Class IV HAYS
ALESSANDROMARTIN
4TH3RD2ND1ST
6TH
8TH
LIVINGSTON
RAMSEY
SAN GORGONIO Class IV Two-way
Class IV Two-way
Shared Street Shared Street
777
13 Shared Use SIdewalkShared Use SIdewalk
Blvd. Class IIB or IV
Protected
Roundabout
Class II/IIB
Class IV Two-way Class IV Two-way
Class IV Two-way-South
Blvd. Class IIB or IV
Park N Play
ALESSANDROMARTIN
4TH3RD2ND1ST
6TH
8TH
SAN GORGONIO
HAYS
LIVINGSTON
RAMSEY
Shared UseSW North
Gradient
Blvd. Blvd. Shared Use SW South
Protected
Roundabout Blvd. C
lass IIB or IV.
13 7
65 Class II/IIB
Class IV Two-way-South Side
ALESSANDROMARTIN
4TH3RD2ND1ST
6TH
8TH
SAN GORGONIO
HAYS
LIVINGSTON
RAMSEY
Class IV Two-way Class IV Two-way
Class IV
Shared StreetShared Street
588
G1: Gateway Sign G 2: Monument Sign G4: I-10 Bridge Markers G5: Off/On Ramp Markers G6: Off/On Ramp Markers Access and Gateways
The Spark
• G1: Gateway Sign. Currently proposed to span over Ramsey at 3rd St. Suggest moving the location to 4th St to better align with where we see the western gateway to the downtown core starting with the proposed planning and development concepts. Although some interesting concept directions have been proposed for the gateway elements, it may be worth stepping back and looking at a holistic approach to all the downtown elements and features as part of a branded downtown effort. Could also consider a downsized approach to the message board to be a more monument-type or pylon-type rather than a road-spanning gateway structure, which could feel very heavy and constraining to future downtown extents.
Alternatives to digital message boards, such as gateway signs and banners, should also be considered. 4th St should be the start of the pedestrian-focused core of downtown, rather than a vehicular focused entry so scaling the gateway elements appropriately will be important.
Park & Play
• G4: 1-10 Bridge Markers. Uniquely identify Banning from I-10 in both the east and west bound directions. Potentially combine with study for other access and gateway opportunities.
• G5: Off/On Ramp Markers. Mark arrival to Banning from I-10 exit ramps with a sign type coordinated with the rest of the gateway and access types. With the limited space, this may need to be a pylontype or monument-type.
Gradient
• G6: Feature Edge Treatment. Repetitive marching of unique urban elements and planting between Livingston and I-10 as arrival edge feature and definition of Downtown Banning as a sustainable district for passerby.
• G2: Monument Sign. Currently proposed at 8th St (southeast corner). 8th St to 4th St to be more of the vehicular focused side of downtown. Will a smaller message board type at 8th be visible enough to call attention to arrival to downtown Banning? Will a gateway element perhaps be more appropriate at this location (and message board at 4th)?
• G3: East Side Gateway. Nothing has been proposed for the eastern edge of downtown as part of the City’s Message Board Signage package, but a complimentary gateway or message board could be considered to better mark the eastern gateway to downtown. Potential locations could include element locations at:
Martin St, the eastern edge of the Civic Center (halfway between Alessandro and San Gorgonio), or at the San Gorgonio intersection. 56 589
1: The Spark
3: Gradient
Concepts
2: Park & Play
G6
G4
G5
Pylon
G2 G1 G3
57590
58 LAND USE & OPEN SPACE
Land Use and Open Space concepts presented three ideas of how to revitalize downtown. Each concept had a particular focus. The Spark depicted a more traditional mixed-use downtown with focus on 1st Street and Alleys, Park & Play provided a more visitor and entertainment focus on Ramsey Street, and Gradient blended land uses from the more residential north side of Ramsey to live-work area near Livingston Street.
591
2: Park & Play
1: The Spark
3: Gradient
Concepts
TRADITIONAL, MIXED-USE
DOWNTOWN
PLACES FOR OUR COMMUNITY
SENSE OF DISCOVERY
FRESH ENTERTAINMENT
DESTINATION FOR VISITORS
MAIN STREET PARK AND STROLL
LIVE/WORK COMMUNITY
SOFTENING AND GREENING
CUSTOMIZED PRODUCTION
59592
Existing Downtown
Framework
1: Freeway to Downtown Transition Area. This area links the freeway entrance at 8th Street to other portions of I-10. Businesses are geared toward freeway and vehicular traffic in general, including fast food restaurants and banks. Large, expansive parking lots cover much of the south side of the street. Despite the appearance of the area, this portion does have some of the most visited businesses in downtown. 2: Downtown Core. The center of downtown, this area is the historic downtown. The portions along Ramsey Street between San Gorgonio Avenue and 2nd Street and along 1st Street between Livingston and Hays have a stronger concentration of pedestrian-friendly, retail shopfronts including popular attractions such as Jitters Coffee, the Fox Theater and the Firehouse Bar and Grill. The portion west of 2nd Street has a more mixed land use, with single-family and multi-family residential, autooriented retail and office/R&D-type facilities. 3: Civic Center/Eastern Transition Area. This area consists of civic-focused uses including City Hall, Police Station and Superior Court.
Ramsey Street transitions from a wide boulevard to the east into the downtown street it is in the Downtown Core. The area has a significant daytime population which could contribute more to the Downtown Core.
4: City-Owned Opportunity Site. This large city-owned, vacant plot has the potential to drastically transform downtown with new development and relate to the Civic Center/Eastern Transition Area to create a new district of Downtown, feeding the downtown core. 5: Vehicular Gateway to Downtown. This intersection will be the pass-through for freeway traffic entering Downtown Banning. 6: Vehicular to Pedestrian Transition/Gateway Point. 4th Street marks the point at which block and building orientation patterns change significantly, marking the beginning of the walkable, historic downtown core. This is an appropriate location for a gateway element to mark the change.
7: Eastern Gateway. There is currently no discernible existing edge or gateway into downtown from the east, but land use and street design changes could create a strong gateway in this area.
60 593
5 6 2 7
3 4
1 Commercial/ Retail Use
Civic Use
Office Use
Residential Use
5 Minute Walk .25 Miles
MARTIN ST
8TH ST
4TH ST
RAMSEY ST
HAYS ST
61594
The Spark
TRADITIONAL, MIXED-USE DOWNTOWN , PLACES FOR OUR COMMUNITY, SENSE OF DISCOVERY Open Space
• OS1: Alley and Paseo Places. A network of narrow back-alley pedestrian paseos to be looped to connect a collection of new open spaces and key downtown businesses. Paseos to be designed as ‘places’ to encourage adjacent business spill-out, exploration, art, and other experiential programming. Intended to initially connect core downtown areas radiating out and connecting to more areas over time to create a broad and connected network of downtown experiences.
• OS2: Banning Pedestrian Mall. A traffic-calmed, pedestrian and event space running north-south along the roadway of 1st Street between Livingston and Hays, creating a plaza-like space and providing opportunities within to stage events and activities of various sizes to help activate downtown Banning. The Mall should be connected to the overall open space network and circulation to encourage pedestrian movement and walkability downtown. The corridor will still be usable by vehicles but may be limited to certain times of day or controlled through other traffic calming measures.
OS1
OS5
OS3
OS4
OS7
OS6
OS2
• OS3: Civic Center Plaza. A new vision for Carpenter Hamilton Park will better open and connect the park to the Ramsey / San Gorgonio intersection and core downtown development. A more hardscape-focused, plaza-like civic space will be highly visible and become the ceremonial gateway to City Hall. The existing fountain to be the focal point of the revamped civic space.
• OS4: Courtyard Discovery Places. A series of new courtyard spaces will provide an opportunity to increase overall vibrancy downtown by introducing a range of new programming options and to serve a broad selection of user groups. Some potential programming for the courtyards may include more intimate, local business focused events and activities such as: spill-out seating, outdoor movies, instructional classes, live music, art installations, and others. A scattering of various courtyard spaces will be linked with pedestrian paseos and help promote a sense of discovery downtown. • OS5: City Recreation Park. The .66-acre vacant lot at 3rd St and Ramsey is a unique opportunity to provide a more actively programmed downtown park space that could serve kids using the adjacent Boys and Girls club as well as local residents not wanting to drive out of the downtown area to find more active types of recreation. Potential sport courts, sports fields, vending kiosks, exercise equipment, and other active recreation uses could be provided in the park.
• OS6: Parklet Places and Connectors. Replacing individual parallel parking spaces along Ramsey with more usable parklets will create opportunities for outdoor dining and other programming.
Parklets grouped along an entire block can provide enhanced connections between areas that cannot be connected through back alleys.
• OS7: Building Pass-throughs. Several potentially underutilized buildings could be repurposed with publicly accessible pedestrian pass-throughs included to help complete key circulation links in the downtown and provide a unique architectural way of integrating interior-focused programming to the downtown experience. Art installations, cafes, entertainment pop-ups, and other uses could all be housed within the buildings and become more easily discoverable for those exploring downtown. LEGEND
62 595
Land Use
• LU1: Civic Center Expansion. Phased expansion concept for the Civic Center to include new expanded Civic Center facilities focused on a featured corner plaza space, new structured district parking garage, and pedestrian paseo connections linking the development. See more detailed information on the proposed expansion concept under Development Site #2.
• LU2: Mixed-use Residential Development. New residential / urban living development concept for the 5-acre City-owned property along Ramsey between San Gorgonio Ave and Martin Street. Concept includes a multi-family residential development, potentially affordable, with parking, mixed-use residential infill with ground floor retail facing Ramsey Street/ San Gorgonio Ave, district parking garage, new courtyard open space, and pedestrian paseo connections linking the development. See more detailed information on the proposed development concept under
Development Site #1.
LU3
LU1
LU2
LU4
LU5
LU4
LU4
• LU3: Downtown Retail Infill. New retail development blocks fill in gaps along San Gorgonio Ave and 1st Street to strengthen a more consolidated downtown core and activated by new adjacent courtyard open spaces and pedestrian paseo connections. • LU4: Multifamily Residential Infill. New multifamily and mixeduse residential infill developments on the outskirts of the core downtown area and support the other new downtown development.
New infill development to include ground floor retail when facing Ramsey. Pedestrian paseo connections to link the new / existing development. See more detailed information on the proposed development concepts under Development Site #3.
• LU5: Neighborhood Shopping Center. New shopping center repurpose and infill concept for the 2.4-acre County Services property at the southwest corner of 4th Street and Ramsey Street. The existing County Services building would be repurposed to a roughly 27,000 SF grocery store and surrounding infill retail would further break down the large existing parking lot with opportunities to add new retail businesses along Ramsey, including a potential location for the proposed laundry mat development. Pedestrian paseo connections to link the new / existing development and create a more walkable district. See more detailed information on the proposed development concept under Development Site #3.
LEGEND
63596
Park & Play
DESTINATION FOR VISITORS, ENTERTAINMENT, MAIN STREET PARK AND STROLL Open Space
• OS1: Main Street Ramsey. Widened sidewalk along Ramsey Street, especially on the north side, to become a major east / west pedestrian promenade and Main Street strolling experience through the downtown, connecting key core area open spaces and businesses. On the west end, 4th Street to become a gateway to a more pedestrian-focused downtown. Opportunities for outside visitors coming into Banning to park and explore downtown on foot to be provided along Ramsey, including a major park and walk hub at 4th Street. On the east end, the Superior Court property anchors the edge of downtown as a major local employment center and could help drive a steady flow of local daytime visitors downtown with a strengthened connection.
• OS2: Boulevard Entry Ramsey. A tree-lined boulevard with a central median and accent planting to greet visitors arriving to downtown Banning from the 8th Street I-10 entrance. Broad medians will allow for easy vehicular u-turning and navigation to western downtown businesses catering primarily to outside visitors / I-10 stopOS4 OS1
OS2 OS3 OS1
overs. Ensuring ease of arrival and access from outside are important to encourage further exploration downtown.
• OS3: Civic Core. A new Civic Center expansion coupled with new-build development at the City’s 5-acre southeast property presents a major opportunity to not only link two important downtown development areas but also create an important open space destination supported by usage shared between both developments. Linking both sides of Ramsey Street will be important to make the north / south side developments feel seamless and connected. A potential tabled roadway crossing could physically help link both sides and slow east / west crossing traffic to prioritize pedestrians. A major new civic open space could be an attractor for both local residents and outside visitors. Some potential programming for the civic park may include: a large event lawn, kids play area, civic-scale water feature or focal element, accent planting areas, shade and greening, and other uses TBD. Lining the park edges with retail and other uses will also help better activate the park.
• OS4: City Park. With proximity to the vehicular / pass-through traffic side of downtown, a new city park at 3rd Street and Ramsey Street would also potentially serve visitors coming into downtown from outside Banning. A flexible-use space is envisioned to allow for a range of users to use the space and would operate mostly as a passive park. A dog park component would be one use that could serve both local residents and be attractive to visitors from the outside to stop and use the park.
LEGEND
64 597
Land Use
• LU1: Civic Center Expansion. Phased expansion concept for the Civic Center to include new expanded Civic Center facilities that would front directly up to Ramsey as a concept and better engage the Ramsey Street/ San Gorgonio Ave intersection, new civic core park, and a widened Ramsey promenade. Ground floor retail would serve the Civic Center facility and help activate the adjacent promenade. Enhanced architectural features on the new Civic Center building would provide visual cues framing the downtown core and act as a gateway. A new structured district parking garage would serve the Civic Center parking needs and be a district parking resource. See more detailed information on the proposed expansion concept under Development Site #2.
• LU2: Mixed-use Hotel/Conference Development. New hotel / conference / urban living development concept for the 5-acre City-owned property along Ramsey Street between San Gorgonio Ave and Martin Street with a focus on attracting outside visitors and guests to downtown Banning. Concept includes a 4-story hotel / conference facility, 5-story multifamily residential development, and LU5
LU4
LU1
LU2
LU3
LU6
a shared structured garage parking. New retail infill development blocks complete the concept on the western half of the property.
New hotel and retail development to front on an existing new civic park and take advantage of the open space linking to the Civic Center development to the north. See more detailed information on the proposed development concept under Development Site #1. • LU3: Entertainment Use. An entertainment use could provide a draw to the hotel and bridge the gap between the hotel and Downtown Core. Examples include pickleball, modern mini golf, axe throwing or an indoor shooting range focusing on Old West or bolt action weapons. See more detailed information under Development Site #1.
• LU4: Ramsey-oriented Infill Development. New retail
development blocks focused on east / west infill along Ramsey Street to strengthen a more connected and activated promenade walk linking downtown. Several infill blocks between 1st Street and 2nd Street to include additional upper level residential / and parking facility over the ground floor retail.
• LU5: Themed Attractor. Business sector focused on elevating the typical retail or customer experience to help attract visitors normally just passing by, help retain them and create opportunities for guests to further explore downtown Banning. Two potential types of subbusinesses being targeted within this category include: Destination Rest Stop and Specialty Farmer’s Market. These uses to be paired with an electric vehicle recharging facility to bring more people in.
See more detailed information under Development Site #3. • LU6: New Drive-thru Restaurant(s). Fast food restaurants located between 4th Street and 8th Street represent some of the most visited existing uses in downtown Banning with visitors coming from I-10 to visit the various businesses as they pass through the area.
Opportunities to infill more food uses exist and will help draw in more outside visitors to downtown. Opportunities to enhance the current and new uses with spill-out seating and shared hang-out spaces would help get visitors out of their cars and exploring more of the downtown area.
LU6
LEGEND
LU3
LU1
LU2
LU5
LU4
65598
Gradient
LIVE/WORK COMMUNITY, SOFTENING AND GREENING, CUSTOMIZED PRODUCTION Open Space
• OS1: District Greening. Finding opportunities to add regular urban greening to existing and repurposed corridors and open spaces downtown will help provide much needed shade and cooling to the district and promote a more walkable environment.
Cutting trees into existing sidewalk areas (with the needed soil volume) will be a long-term project but will drastically change the district. A continuous median along Ramsey will be an opportunity to also plant a regular rhythm of shade trees. Opportunities to also add green infrastructure to the district will help build a more sustainable community and lighten the load on expensive piped infrastructure over time.
• OS2: Secondary Pedestrian Connectors. Existing north / south alleyways to become secondary pedestrian circulation routes to better connect the district and increase walkability. With limited placemaking envisioned within these corridors, opportunities exist for adding green infrastructure and converting these spaces to true ‘green alleys’.
OS3
OS1
OS2
OS4
OS5
• OS3: Civic Center Park. The existing Carpenter Hamiliton Park would be expanded to become an enlarged flexible-use park space for major city-wide events and other programming. Food trucks and other event infrastructure could be brought in as needed to scale up or down events within the space. The entire expanded park to be designed with the geometries needed for a parking lot and would have the ability to be driven over and parked upon with stabilized subsurface systems but would be planted and remain park-like on the surface. No roadway curbs planned within the park area. • OS4: Community Garden. Aligned with the overall sustainability / greening of this concept, a small-scale community garden at 3rd and Ramsey would provide a community sourced agriculture use that could be supported, run, and used by local residents.
The adjacent Boys and Girls Club could also be engaged to help maintain the gardens and use it as a learning tool for the children. • OS5: Buffer Greenbelts. Several east / west greenbelts have been proposed south of Ramsey to help buffer the production / hybrid industrial / creative office land uses proposed in this concept from other potentially non-congruous uses such residential and live / work uses and to give some enhanced visual and noise screening. These buffering greenbelts to also offer important greening to the district and be opportunities to add green infrastructure.
Open Space
LEGEND
66 599
LU4
Land Use
• LU1: Civic Center Improvements. No major facility changes are proposed for the existing Civic Center building in this concept, only modifications to the existing parking lot and to Carpenter Hamiliton Park. Focus of the facility’s primary parking would shift to be head-in parking along Hays. The west side of the Civic Center would function as spill-over parking and mainly as an expanded flexible-use park space when not needed for facility parking.
• LU2: Affordable Housing for Artists. New residential artist living development concept for the 5-acre City-owned property along Ramsey between San Gorgonio and Martin. Concept includes a 3-story artist loft development with surface parking lot flanked by a multi-story live / work development to the south. The western side of the site includes retail infill along Ramsey and larger production / hybrid industrial / creative office blocks on Livingston. See more detailed information on the proposed development concept under Development Site #1.
LU6 LU1
LU2
LU3
LU3
LU5
LU5
• LU3: Live/Work Residential Infill. New live / work infill developments on underutilized or vacant properties along both the north and south sides of Ramsey and between Ramsey and Livingston. Intended to help add people to the district to support new downtown amenities. Live / work units along Ramsey to include ground floor small-scale, self-employed businesses such as artist studios, dentists, accountants, etc and to activate the Ramsey frontage with more economically feasible uses that could work outside of the main downtown core.
• LU4: Multifamily Residential Infill. New multifamily infill developments on underutilized or vacant properties between Ramsey and Hays. Intended to help add people to the district to support new downtown amenities. Low-rise multifamily building types are intended to help better transition denser downtown development to the scale of the adjacent single family residential neighborhoods.
• LU5: Small-scale Production / Hybrid Industrial / Creative Office. Opportunity to introduce some new types of productionbased, hybrid industrial, and creative office uses to the district that would offer business types not happening in surrounding areas and offer the district a unique market position. Many of these businesses could fill in the largely underutilized or vacant properties along Livingston with cost-effective warehouse types of buildings and not affect the smaller-scale, brick-and-mortar Ramsey frontage.
Livingston would offer an attractive access route for those businesses needing loading or truck service without conflicting with more pedestrian-focused areas of downtown.
• LU6: Retail Infill. New retail infill development blocks focused in / around the Ramsey / San Gorgonio intersection to strengthen the downtown core with more consolidated and connected
development. Included with infill to be the vacant lot south of La Carreta Dulceria.
LEGEND
67600
68 LOOK AND FEEL
Each concept had a unique color and material aesthetic to show options for Downtown and ranged from more traditional streetscape, to colorful sculptural design.
601
2: Park & Play
1: The Spark
3: Gradient
SUBTLE ENHANCEMENTS WITH
RUSTIC DESIGN ELEMENTS
PLAYFUL AND COLORFUL WITH
SCULPTURAL ELEMENTS
NATURE FORWARD WITH
PLANTINGS AND NEUTRAL TONES
69602
Public Realm/Placemaking
ENHANCED EXISTING ASSETS
Parklets Public Seating
Farmer’s Market
Town Square
Night Activation
Textured Elements Bike Racks Alley Activation
Gateway Element Bench
Artistic Details Paving
Streetscape Amenities
ELEGANT, DECORATIVE DETAILS, FINE TEXTURES
The Spark
RESTORE DOWNTOWN AS THE HEART OF THE COMMUNITY
70 603
Figure 16. Ramsey and San Gorgonio Intersection
71604
Transit Shelter
Bike Racks
Sculptural Bench
Creative Public Seating
Bench
Pedestrian Lighting Paving
Streetscape Amenities
VIBRANT, SCULPTURAL, INTERACTIVE
Park & Play
GREAT HUBS, ACTIVE SPACES
Creative Public Seating
Multi-Generational Play
Parklets
Interactive Art
Alley Activation
Sculpture
Public Realm / Placemaking
ILLUMINATION AND DISCOVERY IN THE DISTRICT
72 605
Figure 17. Ramsey and San Gorgonio Intersection
73606
Bike Racks
Bench
Information
Textured Elements Paving
Streetscape Amenities
“ECO-CITY”, ORGANIC, BALANCE
Stormwater Infrastructure as Art
Gradient
LIVE/WORK BANNING; BLURRING THE LINES
Community Gardens
Creative Public Seating
Social Space
Parklets
Alley Activation Interactive Art
Public Realm / Placemaking
SOFTEN THE EXPERIENCE
74 607
Figure 18. Ramsey and San Gorgonio Intersection
75608
76 COLOR PALETTES
Two color palettes options were created based on Banning’s history and natural assets. One of these will help guide future design and planning work in the city for amenities, facades, wayfinding, and other signage. 609
77610
Small Town
Charm
COLOR PALETTE
The Small Town Charm color palette encompasses Banning’s colorful history and economic development to this day. It draws inspiration from the vibrant colors of local murals, the annual Stagecoach parade and rodeo, and the bustling downtown
shopping and restaurant scene.
The Small Town Charm
color palette encompasses
Banning’s colorful history
and economic development
to this day. It draws
inspiration from the vibrant
colors of local murals, the
annual Stagecoach parade
and rodeo, and the bustling
downtown shopping and
restaurant scene.
Note: Colors coincide with a few key
points of Banning’s history.
SMALL TOWN CHARM
COLOR PALETTE
1862
Banning developed in coincidence with the
start of the Colorado River Gold Rush
1853
Banning’s first permanent landmark is built on
what is now known as Gilman Ranch.
1774
The Serano and Cahuilla Indian tribes were
well established when Mexican and Spanish
expedition reach the area.
1876
The railroad replaces the stagecoach,
but Banning is still famous for its annual
Stagecoach Days Celebration.
1913
The town of Banning is officially incorporated
and named after Phineas Banning, Father of
the Port of Los Angeles.
1940
The Colorado River aqueduct construction leads
to massive boom in commerce and the local
economy, tripling Banning’s population size.
Present
More than 1500 acres of developable land
are available for housing and commercial
opportunities.
Stagecoach Red
Port Blue
Aqua
Acre Green
Goldrush Yellow
Adobe Tan
Valley Umber
78 611
IRATION
79612
SCENIC
COLOR PALETTE
Bayleaf
Sunset Orange
Goldenrod
Almond
Cedar
Cerulean
Azure
The Scenic color palette
draws inspiration from the
surrounding landscape
and backdrop of the San
Gorgonio and San Jacinto
mountains. With the desert
to the east, the ocean to
the west, and mountains
and lakes both north and
south you can always find
something to do.
Note: Colors coincide with colors
found in Banning’s surrounding
landscapes.
Reminiscent of the mountains painted
against a bright blue sky
Reminiscent of the lush trees and landscapes
in some of Banning’s neighborhoods
Reminiscent of Banning’s striking sunsets and
autumn foliage
Giving a nod to the almond-growing heritage
of Banning
Scenic
COLOR PALETTE
The Scenic color palette draws inspiration from the surrounding landscape and backdop of the San Gorgonio and San Jacinto mountains. With the desert to the east, the ocean to the west, and mountains and lakes both north and south you can always find something to do.
80 613
IRATION
81614
82 FINAL CONCEPT
This section presents the final concept for the Banning Downtown Complete Street and Revitalization project.
The concept is based on community feedback and is primarily The Spark concept with additional elements that complemented it from the other two concepts. This section outlines the design for the streets, land use, and how the design eventually comes to fruition through funding and implementation.
Preferred Concept Theme ��������������������84
The Spark 86
Circulation 88
Look & Feel 90
Full Concept Plan ����������������������������������92
Ramsey Street Downtown Core 96
1st Street 100
Alleys and Courtyards 106
Hays Street & Post Office Linear Park 114
Civic Center Expansion & San Gorgonio Ave 116
East Ramsey Street & South East Lot 122
City Park 126
Neighborhood Shopping Center & Gateway 128
Implementation����������������������������������� 134
Prioritization 135
Grant Funding 136
Cost Estimates 142
SCAG Go Human Pilot Projects 148
Wayfinding 154
615
83616
84 PREFERRED CONCEPT THEME
Three concepts developed in the analysis phase of the project were used to present different design concepts and a range of mobility types, look and feel, land use, and open space. The analysis and engagement with community favored The Spark concept, with additional elements from Park & Play and Gradient. 617
2: Park & Play
1: The Spark
3: Gradient
0 20 40 60 80 100
US FEET
1"=100'
Hub Area
Connections
Gateways
Multi Modal Corridor
LEGEND
6th
3rd
2nd
1st
San Gorgonio
Alessandro
Martin
Ramsey
Hays
Livingston
8th
4th
0 20 40 60 80 100
US FEET
1"=100'
LEGEND
6th
3rd
2nd
1st
San Gorgonio
Alessandro
Martin
Ramsey
Hays
Livingston
8th
4th
LEGEND
6th
3rd
2nd
1st
San Gorgonio
Alessandro
Martin
Ramsey
Hays
Livingston
8th
4th
Med Density Res
RESTORE DOWNTOWN AS THE
HEART OF THE COMMUNITY
GREAT HUBS, ACTIVE SPACES
LIVE/WORK BANNING;
BLURRING THE LINES
85618
The Spark
RESTORE DOWNTOWN AS THE HEART
OF THE COMMUNITY
Key Design Moves
Mobility: More traditional main street with balance of parking and protected bike lanes.
Land Use: Traditional, mixed-use Downtown with development focused on core of Downtown with infill on north-south streets and reuse of existing structures.
Open Space: A network of narrow, historic inspired alley pedestrian paseos to be looped to connect a collection of new open spaces like court yards and shared street and key Downtown businesses.
Applied
Mobility: Ramsey Street features chicanes which slow vehicular traffic and allow for pockets of on street parallel parking. Raised cycle track on either side are connected to wider sidewalks with space for street amenities and furniture. A two-way cycletrack on San Gorgonio Ave connects to schools to the north and south.
Land Use: New: grocery store, hotel, entertainment attractions, retail, residential, live-work, creative industrial.
Open Space: 1st Street is a slow, shared street that connects across Ramsey Street. Complimented by controlled alleys and courtyards that connect to new development and park spaces.
Plazas
Main Gateways
Secondary Gateways
LEGEND
Downtown Center Pedestrian Oriented Corridor
Trees
Cycletrack
Class 2B Bike Lane
4TH
8TH
6TH
86 619
3RD
2ND
1ST
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
87620
Circulation
The Complete Street design allows for vehicular circulation through downtown to access businesses and parking. For cyclists and other micromobility users, cycletracks on Ramsey St and San Gorgonio create safe, comfortable access through and to downtown. To maintain a pedestrian-oriented downtown with cycletracks and shared 1st Street, trucks are routed on Livingston Street. The intersections connecting Livingston Street to Ramsey Street may require further study to accommodate truck turns. Additionally, there are future ideas to use Bryant Street on the south side of the interstate as a couplet for one-way truck traffic. This would require modification and closures to highway ramps and requires partnership with Caltrans for further study.
Cycletrack
Class 2B Bike Lane
Vehicular
Truck Route
Pedestrian-Oriented Corridor
4TH
3RD
2ND
1ST
8TH
6TH
88 621
SAN GORGONIO
RAMSEY
S. ALOLA
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
89622
Look & Feel
90 623
91624
Full Concept
Plan
This plan view shows the entirety of the final concept for Downtown from Martin to 8th Street and Livingston to Hays Street.
All work will be done within public right-of-way.
4TH
8TH
6TH
92 625
0 50 100
3RD
2ND
1ST
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
93626
Areas of Focus
This section is divided into five sections highlighting the major Design Moves of the concept. Each section contains the annotated plan view, sections, precedent imagery, photo simulation, and land use details. 1. RAMSEY STREET, 1ST STREET, ALLEYS/
COURTYARDS, HAYS STREET
PG. 96
2. CIVIC CENTER EXPANSION
& SAN GORGONIO AVE
PG. 116
3. SOUTH EAST LOT
& EAST RAMSEY STREET
PG. 122
4. CITY PARK
PG. 126
5. NEIGHBORHOOD SHOPPING
CENTER & GATEWAY
PG. 128
4TH
8TH
6TH
5 94 627
3RD
2ND
1ST
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
2 43
1 95628
Ramsey Street Downtown Core
The existing wide, and variable width right-of-way, though constrained in some places, allows for the design of a Complete Street along Ramsey Street. The design of the Complete Street accommodates all users with safety and comfort as the top priorities. Travel lanes are 11 feet wide and are designed as a chicane that reduces speeds in the pedestrian-focused Downtown. With the chicane design, parking and short-term flex zones for drop off and deliveries alternate between the north to south side on each end of the blocks. Pedestrians can cross the street at intersections with curb extensions providing a shorter crossing for distance and tighter turning radius for vehicles. Sidewalks are wide, ranging from 10 to 18 feet with room amenities such as outdoor seating, and native, drought tolerant trees and plantings for shade and stormwater catchment. For bicyclists and micromobility users, a protected intersection at Ramsey Street and San Gorgonio Ave would facilitate safe travel through town. This design would benefit school children and parents traveling to the schools located approximately half a mile north and south of Downtown. The 5 foot one-way sidewalk-level cycletracks along Ramsey Street are an extension of the sidewalk with the recommended minimum 3-foot buffer from on-street parking.
Pedestrian-scale street lights are located approximately every 100 feet and are supplemented by overhead string lights. Transit is accessed via bus stops approximately a quarter-mile apart at 3rd Street, 4th Street, and Banning Civic Center (both sides).
Ramsey Street Downtown core between 1st and 4th Street 3RD ST Short term flex zone for deliveries
and rideshare services Bus stop with shelter, trash, lighting, and real time transit information Curb Extensions
Dedicated sidewalk level
bike paths with buffer from parking and traffic
629
2ND ST
1ST ST
A B Wide sidewalk with sidewalk
dining, street trees, and
stormwater catchment
Overhead and pedestrianscale street lamps for safety Chicanes calm traffic and allow for alternating parking
Protected intersection
connects Two-way
cycletrack on San
Gorgonio Ave with sidewalk level one-way
paths on Ramsey Street
SAN GORGONIO AVE
97630
Precedent images for Ramsey Downtown core
98 631
12’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
11’ 8’
73’
RAMSEY
5’ 3’ 11’ 3’ 5’ 15’
SIDEWALK
CYCLE
TRACK
SIDEWALK
CYCLE
TRACK
W E
15’ Sidewalk
12’ Sidewalk 12’ Sidewalk
5’ CT +3’ Buer
5’ CT +3’ Buer 5’ CT +3’ Buer
15’ Sidewalk
5’ CT +3’ Buer
73’
1”=10’
A
Ramsey Street complete street with chicane travel lanes, parking, raised cycle tracks, and wide sidewalks
B
Ramsey Street by Fox Theater
70’
15’ 5’ 3’ 11’ 11’ 3’ 5’ 17’
SIDEWALK TRAVEL LANE TRAVEL LANE SIDEWALK
SIDEWALK
CYCLE
TRACK
SIDEWALK
CYCLE
TRACK
RAMSEY AT FOX
W E
99632
1st Street
1st Street is the heart of the Downtown and connects historic and cultural locations north and south of town. Pedestrians are again the focus, with the street design signaling this to drivers via the raised curbless intersection of 1st and Ramsey. This elevated feature transitions back to street grade midblock north and south of Ramsey.
It also transitions on the north side to the expansive, Native American/Historic-themed street mural leading to the Dorothy Ramon Learning Center and Garden.
Plan view for shared, slow, pedestrian-oriented 1st Street
HAYS ST
1ST ST
Durable, cooling paint street mural representing Native American and Banning history 1s Street becomes prominent connection to local community organizations, businesses and neighborhood 633
A
RAMSEY ST
Gateway elements along
Livingston Street to attract
attention from highway
Curbless intersection with
cooling paint mural
Parking for local businesses along the 1st Street
Potential future indoor/outdoor
pedestrian cut-through with retail from alley to 1st Street
LIVINGSTON ST
Curbless intersection slopes to street level after half block north and south of Ramsey Street Overhead lighting signifies Downtown core
Potential future open space and cut-through from alley to 1st Street
SAN GORGONIO AVE
101634
1st Street
The slow, shared street enabled by the design elements such as permeable pavers, plantings, and pedestrian-scale lighting creates space for people such as street festivals and opens the possibility to expand the public realm as infill park and seating spaces with shade and stormwater infrastructure. 1ST STREET - B
100’ 50’ S N
Section of 1st Street with potential expansion
of open space behind Fox Theater
102 635
Precedent images for shared, slow, pedestrian oriented 1st street 103636
Existing 1st Street and Ramsey Street
104 637
A
Photo simulation of Slow-Shared 1st Street and Ramsey Street with chicane travel lanes and sidewalk level bike lanes A
A
Curbless intersection across
Ramsey St at 1st St
One-way sidewalk level
cycletracks on Ramsey
Chicane travel lanes to
slow traffic speed
Native plantings for shade and
stormwater catchment
Pedestrian-scale light
posts and overhead
across street
Pedestrian-oriented 1st St
1ST STREET
RAMSEY STREET
105638
Alleys and Courtyards
Alleys and courtyards create a network of pedestrian connections in the heart of Downtown. These public gathering and connective spaces would be controlled with gates that are locked in the evening to prevent vandalism. Shade for users to relax would be provided by new trees and artistic, colorful elements. Lighting would also make the spaces feel safe with string lights and pedestrian-scale street lamps.
Stormwater catchment would be collected via plantings in alleys and courtyards as part of the larger green infrastructure network. Courtyards are designed so that they could be built first and have commercial development along San Gorgonio fill in over time. An alternative design is also presented with permeable surface parking lots on the north and south ends of the blocks. Both or either of these lots could be built to provide public parking for Downtown, and could be filled in with commercial development and expanded courtyards as needed. The designs in all cases allow for access of consolidated waste collection via north-south alleys, or mid block from San Gorgonio. Future connections through the parcels midblock between the courtyards and 1st Street could also facilitate more pedestrian movement through town and provide unique retail experiences along these indoor/outdoor arcades.
A
Full courtyards and alleys on blocks north and south of Ramsey Street Consolidated waste pickup
SAN GORGONIO AVE
HAYS ST
RAMSEY ST
Controlled access alleys and courtyards with amenities such as game courts, outdoor stages, shade structures, lighting, seating,
trees, trash receptacles, and native plantings for stormwater catchment Consolidated
waste pickup
639
New
Commercial
New
Commercial
Alternative with permeable surface parking lots that could be filled with courtyards and commercial development
Consolidated waste pickup
SAN GORGONIO AVE
HAYS ST
RAMSEY ST
Permeable pavers in parking lots for stormwater catchment 107640
Precedent images for alleys and courtyards
108 641
72’
14’ 58’
Section for Alley/Courtyard next to Fox Theater
A
109642
Existing Alley next to Fox Theater
110 643
Photo simulation of Alley next to Fox Theater with seating, shade and lighting A
AALLEY
RAMSEY ST
Controlled-access alleys with
seating and amenities
Controlled-access courtyards
connected to alleys
Historic and local themed art
by local artists
Pedestrian-scale lighting
111644
Existing Alley and parking lot north of Ramsey Street next to Dulceria 112 645
Photo simulation of Alley and Courtyard north of Ramsey Street next to Dulceria A
AALLEY
HAYS ST
RAMSEY ST
Consolidated waste collection
Pedestrian-scale lighting
Permeable pavers for
stormwater
Native, drought tolerant plant species for
stormwater catchment and greening
Controlled access from Hays
Street with decorative
gates and planters
Shade structures to mitigate
heat island effect
Controlled access courtyard
space for community
gathering and relaxation
113646
Hays Street & Post Office Linear Park
Hays Street is the northern boundary of the study area and is where the residential neighborhood to the north transitions to Downtown. There are two alternative designs for Hays Street that show how different amounts of parking affect the width of sidewalks and ability to have street trees. The one represented in the diagram below includes parking along one side, which allows for 10 foot sidewalks and trees on both sides. The other section showing parking on both sides only has 6 foot sidewalks and no street trees and is essentially the existing condition. To the east on the other side of the police station is another new section of Hays Street that reclaims the street from the parking lot of the post office. This pedestrian-oriented street could be designed to accommodate food vendors serving employees and visitors to the Civic Center, Police Station, and Post Office. It could also serve Downtown more broadly on Festival Nights when Ramsey Street is closed to traffic.
Hays Street and linear park in Post Office parking lot
A/B
Parking on one side allows for wider sidewalks, and native, drought tolerant trees and planting
12’ Two-way cycletrack on San Gorgonio Ave connecting
to grade schools and local businesses north and south of Downtown (section in following section)
HAYS ST
SAN GORGONIO AVE
MURRAY ST
ALESSANDRO ST
114 647
10’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
11’ 8’
50’
Parking One Side
Parking Both Sides
11’ 10’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
8’
PARKING
8’ 11’
50’
6’ 11’ 6’
W E
W E
9’ Sidewalk
10’ Sidewalk
11’ Travel Lane
11’ Travel Lane
10’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
11’ 8’
50’
Parking One Side
kith Sid
11’ 10’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
8’
PARKING
8’ 11’
50’
6’ 11’ 6’
SLOW STREET/ PARKING ACCESS LINEAR PARK
45’
20’ 25’
W E
W E
W E
A
B
C
Typical sections for Hays Street showing one-or two-sided parking Linear park in Post Office parking lot
10’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
11’ 8’
50’
Parking One Side
Parking Both Sides
11’ 10’
SIDEWALK TRAVEL LANE TRAVEL LANE PARKING SIDEWALK
8’
PARKING
8’ 11’
50’
6’ 11’ 6’
W E
W E
9’ Sidewalk
10’ Sidewalk
11’ Travel Lane
11’ Travel Lane
C
MARTIN ST
115648
Civic Center Expansion & San Gorgonio Ave
The phased expansion concept for the Civic Center includes new expanded Civic Center facilities that would front directly up to Ramsey Street and better engage the intersection, new civic core park, and a widened Ramsey promenade. Enhanced architectural features on the new Civic Center building would provide visual cues framing the Downtown core and act as a gateway. Behind the new Civic Center, a new structured district parking garage would serve the Civic Center parking needs and be a district parking resource allowing the public to park and walk to the Downtown core via a network of pedestrian paths and promenades.
Phase 2:
Demolish existing City Hall
Phase 3:
New City Hall expansion building, located facing Ramsey Street. • New Civic Area: 18,920 SF
Phase 4:
New structured parking garage to replace former City Hall site on back site, located facing Hays Street. • Parking Area: 31,524 SF
• Parking Spaces Per Floor: 96
• Floors: 2
• Total Parking Spaces: 192
Phase 1:
New City Hall expansion building to be located within current parking lot New Civic Area: 23,214 SF
P1
P2
P3
P4
649
Plan view of Civic Center expansion and San Gorgonio Ave Complete Street enhancements PH1
PH3
PH2
P4
AB
Protected intersection
connects Two-way
cycletrack on San
Gorgonio Ave with sidewalk level one-way
paths on Ramsey Street
New Civic Center with multi-story garage for Civic employee and Public use 12’ Two-way cycletrack on San Gorgonio Ave provides protected facility for cyclists and micromobility users connecting Downtown to high school south of the highway across the overpass
RAMSEY ST
SAN GORGONIO AVE
HAYS ST
117650
San Gorgonio Ave
13’
SIDEWALK SIDEWALK
TWO-WAY
CYCLETRACK
TRAVEL LANE TRAVEL LANE
11’
68’
11’ 3’ 12’ 10’
PARKING
8’
S N
13’
SIDEWALK SIDEWALK
TWO-WAY
CYCLETRACK
TWO-WAY
CYCLETRACK
TRAVEL LANE TRAVEL LANE
11’
68’
11’ 3’ 12’ 10’
13’
SIDEWALK TRAVEL LANE TRAVEL LANE SIDEWALK
11’
60’
11’ 3’ 12’ 10’
11’ Travel Lane
11’ Travel Lane
10’ Sidewalk
12’ cycletrack + 3’ Buer
13’ Sidewalk
PARKING
8’
S N
S N
SAN GORGONIO
A B
Sections for San Gorgonio Ave with 12’ two-way cycletrack. North of Ramsey Street has parking on west side 118 651
Precedent images for Civic Center expansion and San Gorgonio Ave complete street enhancements 119652
Existing Ramsey Street and San Gorgonio Ave intersection 120 653
A
Photo simulation of Ramsey Street and San Gorgonio Ave with protected intersection and cycletracks A
SAN GORGONIO AVE
RAMSEY ST
One-way sidewalk level
cycletracks on Ramsey St Protected intersection
at Ramsey St and San
Gorgonio Ave
Two-way Class IV Cycletrack
121654
East Ramsey Street & South East Lot
Ramsey Street through this section of Downtown would have a planted median with trees to signal a transition into the Downtown starting at the new gateway across Ramsey at Martin Street. Bus stops would allow transit riders to access Downtown via the stops on either side of Ramsey Street near the Civic Center. The lot to the south east of this intersection of Ramsey Street and San Gorgonio Ave would be a Downtown activity anchor for all types of users. New residential opportunities, in the form of apartments and live-work studios, would be located at the eastern edge near the new gateway at Martin Street. In the middle of the block would be a two-story parking structure accessed from Livingston serving the new hotel, conference center, and potentially provide public parking Downtown. The historic San Gorgonio Inn sign could be located near the hotel where it stood and be part of a larger wayfinding program in town. A new themed attractor, commercial development and active entertainment parks would be located on the western third of the lot between the oldest buildings in town and the new hotel. These attractor areas would provide entertainment for both local residents and visitors passing through or staying at the new hotel. The active entertainment park would be a continuation of the Civic Park to the north and could include large event lawn, play areas, shade, etc. Additional parking with permeable-surface would provide parking to these areas and be a collection point of stormwater contributing to the larger green infrastructure system in town.
Residential:
• Area: 15.398 SF
• Units Per Floor: 16
• Floors: 3
• Total Resi Units: 48
R1
Surface Parking Lot for Themed Attractors West
Side:
• Parking Area: 14,375 SF
• Total Parking Spaces: 48
P3
H1 Hotel/Conference
Center:
• Hotel Area: 24,894 SF
• Conference Area: 5,000 SF
• Rooms Per Floor: 41
• Floors: 4
• Total Rooms: 123
C2 Themed Attractor/Park:
• Retail Area: 15,404 SF
• Park Area: 17,934 SF
C1 In-fill Commercial:
• Retail Area: 6,476 SF
P1 Parking Garage:
• Parking Area: 25,573 SF
• Parking Spaces Per Floor: 78
• Floors: 2
• Total Parking Spaces: 156
P2 Surface Parking Lot for Residential on East Side:
• Parking Area: 12,376 SF
• Total Parking Spaces: 48
Shade covered alley connection across
San Gorgonio to new
themed attractor site
SAN GORGONIO AVE
Residential:
• Residential Area: 740 SF
• Floors: 2
• Total Residential Units: 20
• Parking Under Unit
R2
655
Plan view of East Ramsey Street along South East Lot with hotel/parking garage, themed attractor, open spaces, and housing in the form of apartments and live-work studios C2 C2
C1 C2
P2
H1 R1
R2
Short term flex zone for hotel,
deliveries, and rideshare services
Permeable pavers and planting
for parking lot to collect/mitigate stormwater runoff
Bus stop with shelter, trash, lighting, and real time transit information Pedestrian-scale lighting and overhead string
lights for safety and
Downtown branding
Pedestrian-scale gateway at Martin Street to signal
beginning of Downtown
Planted median with native, drought tolerant species. Serves as traffic calming, stormwater catchment, shade, and act as transition after gateway to Downtown from the east at Martin Street
RAMSEY ST
LIVINGSTON ST
A
ALESSANDRO ST
MARTIN ST 123656
14’
SIDEWALK TRAVEL LANE BUS STOP/FLEX ZONE SIDEWALK
11’ 14’
TRAVEL LANE
11’ 10’
83’
5’ 3’ 5’ 10’-13’
W E
SIDEWALK
CYCLE
TRACK
SIDEWALK
CYCLE
TRACK
Bus Stop Flex Zone
14’ Sidewalk
10’ Sidewalk
RESTORED SAN
GORGONIO INN SIGN
RAMSEY EAST
East Ramsey Street
Section of east Ramsey Street with planted median and bus stop A
124 657
Precedent images for east Ramsey Street and South East Lot 125658
Plan view of city park
City Park
The .66-acre vacant lot at 3rd St and Ramsey is a unique opportunity to provide a more actively programmed
Downtown park space that could serve children using
the adjacent Boys and Girls club as well as local residents seeking recreational opportunities within downtown. Ball courts and open spaces for sports, vending kiosks, exercise equipment, and other active recreation uses could be
provided in the park.
A
B
Bus stop with shelter, trash, lighting, and real time transit information Cooling paint across
intersection and on half
of numbered streets
mimicking 1st Street
3ND STREET
2ND STREET
RAMSEY ST
LIVINGSTON ST
126 659
B
Livingston HAYS
8 111110
PARKING
8’
TRAVEL LANE TRAVEL LANE
12’ 12’
W E
W E
14 78’
5 3
8’
SIDEWALK
40’
Livingston Street with one lane of parking and wider sidewalk with trees A
Ramsey Street in front of city park with bus stop
Bus Stop/BG Park
Livingston
PARKING
8’
TRAVEL LANE TRAVEL LANE
11’ 11’ 10’
PARKING
8’
TRAVEL LANE TRAVEL LANE
12’ 12’
SIDEWALK
CYCLE
TRACK
W E
W E
14’
SIDEWALK BUS STOP SIDEWALK
78’
5’ 3’ 5’ 11’
8’
SIDEWALK
40’
SIDEWALK
CYCLE
TRACK
SIDEWALK
CYCLE
TRACK
Precedent images for city park
127660
Neighborhood Shopping Center & Gateway
The final concept has a new shopping center and retail infill for the 2.4-acre County Services property at the southwest corner of 4th St and Ramsey. The existing County Services building would be repurposed to a roughly 27,000 SF grocery store. Surrounding infill retail would further replace the large existing parking lot, with opportunities to add new retail businesses along Ramsey, including a potential location for the proposed laundromat development. Residential and small creative industrial spaces would round out the land uses along 4th Street and Livingston Street.
MATCH LINE
MF1 MF2
MXR2 Mixed-use Residential #2:
• Ground Floor Retail Area: 3,471 SF
• Upper Floor Residential Area: 6,930 SF
• Residential Units Per Floor: 7
• Total Floors: Ground Floor +1
• Total Residential Units: 11
MF1 Multi-family Residential #1 (4-plexes):
• Area: 3,900 SF/Building
• Units Per Floor: 2
• Floors Per Building: 2
• 4-plex Buildings: 4
• Total Units: 16
• Parking: 4 bay garage/building
MF2 Multi-family Residential #2:
• Area: 9,742 SF
• Units Per Floor: 10
• Floors: 2
• Total Residential Units: 20
• Parking: Garages on Site
MF3 Multi-family Residential #3:
• Area: 6,600 SF
• Units Per Floor: 7
• Floors: 2
• Total Units: 14
MF4 Multi-family Residential #4:
• Area: 5,850 SF
• Units Per Floor: 9
• Floors: 2
• Total Units: 18
P2 Surface Parking Lot #2:
• Parking Area: 3,770 SF
• Parking Spaces: 11
• Additional permit parking on N 4th Street
MXR1 Mixed-use Residential #1:
• Ground Floor Retail Area: 7,607 SF
• Ground Floor Residential Area: 7,171 SF
• Ground Floor Residential Units: 7
• Upper Floor Residential Area: 14,750 SF
• Upper Floor Residential Units: 15
• Total Floors: Ground Floor +2
• Total Residential Units: 37
P1 Surface Parking Lot #1:
• Permeable Surface for stormwater catchment
• Parking Area: 5,184 SF
• Parking Spaces: 32
C4 • In-fill Commercial:
• Area: 7,300 SF
C3 • In-fill Commercial:
• Area: 5,500 SF
C2 • In-fill Commercial:
• Area: 5,540 SF
C1 • Existing County Services Building
• Converted to New Grocery Store:
• Commercial Area: 27,000 SF
• Surface Parking Spaces: 63
Table-top crosswalk with pedestrian signal at
intersection of Ramsey
Street and 6th Street 6TH STREET
661
Plan view of neighborhood grocery store and adjacent mix of residential and commercial uses C1 C2
P2
MF4
C4
MF3
C3 MXR1
P1
MXR2
MATCH LINE
Repurposed Social Services Building
Permeable pavers and planting for parking lot to collect/ mitigate stormwater runoff
Gateway elements along
Livingston Street to attract drivers from I-10
Class IIB buffered bike lane, and
additional parking protection on south side of Ramsey Street Curb extensions to create shorter,
safer crossings for pedestrians
and lower traffic speed through downtown
Bus stop with shelter, trash, lighting, and real time transit information Pedestrian-scale gateway at 4th Street to signal
beginning of Downtown
Planted median with native, drought
tolerant species. Serves as traffic calming, stormwater catchment, shade A
4TH STREET
RAMSEY ST
129662
Precedent images for neighborhood shopping area and 4th Street gateway 130 663
BANNING
BANNING
4th Gateway
10’
SIDEWALK TRAVEL LANE SIDEWALK
11’
TRAVEL LANE
11’ 17’
80’
6’ 2’ 15’
CLASS 2B
BIKE LANE
2’ 6’
10’
SIDEWALK TRAVEL LANE SIDEWALK
11’
TRAVEL LANE
11’ 17’
80’
6’ 2’ 15’
C 2B
LANE
2’ 6’
C 2B
LANE
CLASS 2B
BIKE LANE
W E
W E
A
Section of Ramsey Street with planted median west of 4th and gateway sign over east leg of 4th Street Gateway sign at night
131664
Existing Ramsey Street at 4th Street
132 665
A
Photo simulation of Ramsey Street showing 4th Street gateway and planted median A
RAMSEY ST
4TH ST
LIVINGSTON ST
Class IIB buffered bike lane
4th St Gateway Sign with historic
and natural themes
Bus stops with shelter, lighting, trash,
and real time transit info
Storm water catchment
Pedestrian-scale lighting
133666
134
IMPLEMENTATION
There are a number of projects outlined in this plan and not all can be completed all at once with some requiring extensive construction and coordination with stakeholder partners. Other projects are simpler and can be completed with little effort creating the “spark” of the Banning Downtown Complete Streets and Revitalization.
667
Prioritization
The projects are split into three phases of priority based on complexity.
Priority A Projects - 0-5 Years
The first phase in 0-5 years begins with Priority A projects which are the easiest and lowest cost improvements to kick-start the revitalization and street improvements. This phase includes: The Go Human Pilot Projects, Parking Signage/Plan, Shared 1st Street, Controlled Alleys, Lighting Across Ramsey Street and 1st Street, Wayfinding Signage/Plan, and Bus Stop Improvements.
Priority B Projects - 5-10 Years
The second phase in 5-10 years continues with Priority B projects which are ones that expand the spark of the initial projects through the creation of new public spaces and gateway elements to designate the new downtown area between 4th Street and Martin Street as well as ones along the interstate and near on-off ramps. This phase includes: Courtyards, Gateways, 3rd Street Park, and Post Office Linear Park.
Priority C Projects - 10-20 Years
The third phase in 10-20 years contains the more complex and costly projects involving significant funding, and coordination with stakeholders to make needed roadway and land use improvements. These projects once completed will make Downtown Banning a pedestrian-oriented space where all users feel comfortable walking and rolling. This phase includes: Ramsey Complete Street from Martin Street to 8th Street, San Gorgonio Ave twoway cycletrack, San Gorgonio Ave/Ramsey Street protected intersection, Numbered/ secondary street improvements, Indoor pedestrian pass-throughs, Livingston-highway ramp reconfiguration, and Civic Center expansion.
PROJECT
Active
Transportation
Program (ATP)
P
Pilot projects
Parking signage
Shared 1st Street
Controlled alleys
Lighting across Ramsey and 1st St
Wayfinding
Bus stop improvements
Courtyards
Gateways
3rd Street park
Post Office linear park
Ramsey Complete Street- Martin St to 8th St
San Gorgonio Ave two-way cycletrack
San Gorgonio Protected Intersection
Numbered/secondary street improvements (1st, 2nd,
3rd, 4th, Hays, Livingston/6th)
Indoor pedestrian pass-throughs connecting alleys to
1st Street/courtyard expansions.
Livingston-Highway ramp reconfiguration for truck
route
Civic Center Expansion
C
A
B
135668
Grant Funding
Grant funding for these projects will be a combination of State, Regional, and Federal funds and cover all aspects of the project to complete roadway improvements, amenity and placemaking, and climate resiliency elements.
State
Active Transportation Program (ATP)
The ATP was created to expand the use of active transportation through encouragement and safety measures that increase the proportion of walking and biking trips, reduce greenhouse gas emissions, and enhance public health. Eligible projects include infrastructure projects, education, encouragement, outreach, and enforcement of non-infrastructure projects. These projects further the goals of the ATP through a combination of infrastructure and non-infrastructure activities, and the development of active transportation plans in disadvantaged communities. Senate Bill 1 (SB 1) stipulates that $100 million of revenues from the Road Maintenance and Rehabilitation Account will be available annually to the ATP. The ATP consolidates existing federal and state transportation programs, including the Transportation Alternatives Program (TAP), Bicycle Transportation Account (BTA), and State Safe Routes to School (SRTS), into a single program with a focus to make California a national leader in active transportation. Applications are typically submitted in July.
https://catc.ca.gov/programs/active-transportation-program Affordable Housing And Sustainable Communities Program
(AHSC)
The goals of AHSC are to support compact development in order to preserve land, reduce greenhouse gas emissions, and increase the supply of affordable housing near jobs, stores, transit, and other key destinations. Eligible projects include sustainable transportation infrastructure, such as new transit vehicles, sidewalks, and bike lanes; transportation-related amenities, such as bus shelters, benches, or shade trees; and other programs that encourage residents to walk, bike, and use public transit.
https://sgc.ca.gov/programs/ahsc/
California Department of Forestry and Fire Protection
(CalFire) Urban and Community Forestry Grants
The Urban and Community Forestry Grant Program strives to increase the long-term benefits trees provide, improve the public’s understanding and appreciation of urban trees, and advance urban forest management and tree care. Special consideration is given to projects serving disadvantaged and/or low-income communities.
https://www.fire.ca.gov/what-we-do/grants/urban-andcommunity-forestry-grants California Strategic Growth Council Regional Climate
Collaboratives (RCC) Grant
The Regional Climate Collaboratives (RCC) Program is designed to help communities establish partnerships, funding pathways, plan and policy readiness, and a local network of Technical Assistance providers to pursue funding and implement climate projects. RCC funds collaboratives of cross-sectoral and community-rooted partners, seeking to advance both place-based and region-wide climate change mitigation, adaptation, and resiliency efforts. https://www.grants.ca.gov/grants/regional-climate-collaborativesprogram-round-2/ California Transportation Commission Local Partnership
Program (LPP)
This program provides $200 million in funding for local and regional transportation agencies with voter-approved taxes, tolls, or fees, which are dedicated solely to transportation improvements. The program provides funding for aging infrastructure, road conditions, active transportation, transit and rail, and health and safety benefits. The LPP funds are distributed through a 40% statewide competitive component and a 60% formulaic component.
https://catc.ca.gov/programs/sb1/local-partnership-program Clean California Grant
The California Department of Transportation (Caltrans) developed the Clean California Local Grant Program through which funds will go to local communities to beautify and improve local streets and roads, tribal lands, parks, pathways, and transit centers. Through the combination of adding beautification measures and art in public spaces along with the removal of litter and debris, this effort will enhance communities and improve spaces for walking and recreation. The goals of the Clean CA are to: Reduce the amount of waste and debris within public rights-of-way, pathways, parks, transit centers, and other public spaces; enhance, rehabilitate, restore, or install measures to beautify and improve public spaces and mitigate the urban heat island effect; enhance public health, cultural connection, and community placemaking by improving public spaces for walking and recreation.
https://cleancalifornia.dot.ca.gov/local-grants/local-grant-program Clean Mobility Options (CMO)
Clean Mobility Options (CMO) is a statewide public program that empowers under-resourced communities across California to better understand and overcome mobility obstacles with vouchers that fund community needs assessments and clean, shared, zeroemission transportation projects such as car EV carshare/charging, bikeshare, and zero-emission transit services. The goals are to improve access to clean mobility options, advance workforce development in the clean transportation sector, increase zeroemission vehicle adoption, reduce vehicle miles traveled, advance mobility equity and improve air quality. Clean Mobility Options is funded by California Climate Investments, a statewide initiative that puts billions of Cap-and-Trade dollars to work reducing greenhouse gas emissions, strengthening the economy, and improving public health and the environment—particularly in underserved communities, and California Energy Commission’s Clean
Transportation Program, which is investing more than $1 billion to accelerate the deployment of zero-emission transportation infrastructure and support in-state manufacturing and workforce training and development.
https://cleanmobilityoptions.org/about/
The Ford Family Foundation Large Good Neighbor Grants
Good neighbor grants are designed to support community
initiatives including unforeseen emergencies that interrupts programming or services. Examples of Good neighbor grants include: Emergency repairs to essential equipment at a food bank, library, fire hall or other community service provider; Updates to facilities at a beloved community gathering place, including ADA accessibility and technology; Community events such as celebrations, clean-ups or summer arts and music festivals; New or 136 669
special programs for the children and families in your communities; Studies or research on a community need; Playgrounds or recreational facilities; Translation of materials or outreach to special populations; Basic needs for vulnerable children and families; Programs or projects that support local economic development efforts. Grants will fund up to one-third of a project or program’s total budget and 50 percent of the budget should be raised before applying.
https://www.tfff.org/grants/open-grants/
Rubberized Pavement Grant Program
The California Department of Resources Recycling and Recovery (Cal Recycle) provides the Rubberized Pavement Grant Program formerly called the Rubberized Asphalt Concrete (RAC) Grant Program, to promote markets for recycled-content surfacing products derived from waste tires generated in California, and decrease the adverse environmental impacts created by unlawful disposal and stockpiling of waste tires. In past rounds, $4 million has been available for funding. $250,000 is the maximum for individual applications.
https://calrecycle.ca.gov/tires/grants/pavement/
State Transportation Improvement Program (STIP)
The STIP is a multi-year capital improvement program of transportation projects on and off the State Highway System, funded with revenues from the Transportation Investment Fund and other funding sources. Funding consists of two components:
Caltrans’ Interregional Transportation Improvement Program (ITIP) and regional transportation planning agencies’ Regional Transportation Improvement Program (RTIP). Pedestrian and bicycle projects may be programmed under ITIP and RTIP. STIP programming occurs every two years. In 2022, STIP added additional funding for active transportation improvements. https://catc.ca.gov/programs/state-transportation-improvementprogram Transportation Development Act Funds (TDA)
TDA provides funding from State Transit Assistance (STA) and Local Transportation Fund (LTF). This program funds a variety of transportation programs including for pedestrians, bicyclists, and transit facilities. The amount of funding is based on sales tax collected in each county. This fund is administered by Caltrans. https://dot.ca.gov/programs/rail-and-mass-transportation/ transportation-development-act
The Urban Greening Program- California Natural Resources Agency
The Urban Greening Program, funded by the General Fund, continues the legacy of these programs. Consistent with AB 32, the Urban Greening Program will fund projects that reduce greenhouse gases while also transforming the built environment into places that are more sustainable, enjoyable, and effective in creating healthy and vibrant communities. These projects will establish and enhance parks and open space, using natural solutions to improve air and water quality and reducing energy consumption, and creating more walkable and bike-able trails. Approximately $23.7 million is available for urban greening projects. The State anticipates one funding cycle; however, funding cycles are contingent upon the number of competitive applications. There are no maximum or minimum grant amounts.
https://resources.ca.gov/grants/urban-greening
Regional
Caltrans Sustainable Transportation Planning Grant Program Sustainable Communities Competitive: To fund local and regional multimodal transportation and land use planning projects that further the region’s RTP SCS/APS (where applicable), contribute to the State’s GHG reduction targets, and address the needs of underserved communities.
Sustainable Communities Formula: To fund local and regional multimodal transportation and land use planning projects that further the region’s RTP SCS/APS (where applicable) and contribute to the State’s GHG reduction targets. Climate Adaptation Planning:
To fund local and regional identification of transportation related climate vulnerabilities through the development of climate adaptation plans, as well as project-level adaptation planning to identify adaptation projects and strategies for transportation infrastructure.
Strategic Partnerships: To fund transportation planning studies in partnership with Caltrans that address the regional, interregional, and statewide needs of the State highway system.
https://dot.ca.gov/programs/transportation-planning/divisionof-transportation-planning/regional-and-community-planning/ sustainable-transportation-planning-grants
Southern California Association of Governments- Go Human SCAG seeks to facilitate opportunities for equity-centered strategies to meet local and regional safety goals. The Go Human Community Hubs Grant Program offers funding opportunities for community organizations to implement local traffic safety and community engagement strategies that leverage community gathering and resource sites or networks. The program aims to support streetlevel community resiliency and increase the safety of people most harmed by traffic injuries and fatalities, including without limitation Black, Indigenous and People of Color; people with disabilities; and frontline workers, particularly those walking and biking.
Funding for this program is provided by a grant from the California Office of Traffic Safety (OTS), through the National Highway Traffic Safety Administration.
Funding is available to recipients across the SCAG region, which encompasses the counties of Imperial, Los Angeles, Orange, Riverside, San Bernardino and Ventura and will be distributed to prioritize equity, particularly within communities that have been historically disinvested or in disadvantaged communities. https://scag.ca.gov/apply-funding
Transportation Uniform Mitigation Fee (TUMF)
The Western Riverside Council of Governments developed and administers the Transportation Uniform Mitigation Fee (TUMF). This fee is an obligation that must be met on all new development in Western Riverside County. For some developments, the developer is exempt from paying TUMF, but where the local agency has determined that TUMF is due, a developer will need to pay their TUMF fees. These fees vary based on the land use type of the proposed development and its size. These factors influence how traffic will be increased due to development. The TUMF fee goes toward providing improvements to improve local traffic. https://wrcog.us/174/TUMF
137670
Federal
California Department of Parks and Recreation Outdoor
Recreation Legacy Partnership (ORLP) Program
The Outdoor Recreation Legacy Partnership (ORLP) program was established in 2014 and is funded through the Land and Water Conservation Fund. ORLP is a nationally competitive program targeting grant assistance to help economically disadvantaged urban communities of at least 30,000 people with no, or almost no, access to publicly available, close-by, outdoor recreation. Funds can be used for the acquisition and/or development of new, or to substantially renovate obsolete, public parks and other outdoor recreation spaces. The Outdoor Recreation Legacy Partnership (ORLP) Program is a federal National Park Service (NPS) grant program. ORLP involves two competitive layers. Applications are first competitively reviewed by California Department of Parks and Recreation, Office of Grants and Local Services (OGALS).
Applications selected by the state are then forwarded to National Park Service to compete in the nationwide competition.
https://www.parks.ca.gov/?page_id=30578
Carbon Reduction Program
Authorized with the BIL in 2022, the Carbon Reduction Program is a DOT program that funds projects that support a reduction in transportation emissions. Eligible projects include bicycle and pedestrian infrastructure and public transit facilities. Caltrans distributes funding based on population sizes using the 2020 Census.
https://www.fhwa.dot.gov/bipartisan-infrastructure-law/crp_fact_ sheet.cfm
The Community Development Block Grant (CDBG)
The Community Development Block Grant (CDBG) is a Federally funded block grant program created by Congress in 1974, with the overall goal to develop viable urban communities by providing decent housing and a suitable living environment primarily for lowmod income persons.
CDBG works toward the development of viable urban communities, by providing decent housing and a suitable living environment and expanding economic opportunities, principally for persons of low and moderate income. Example eligible activities include public services such as senior or child care services, health services, youth services; housing services such as programs for lower and moderate income households; and public improvements such as streets, curbs, gutters, sidewalks, streetlights, sewers, storm drains, traffic signals, parks and recreation facilities, health facilities, and fire station improvements.
https://rivcoeda.org/Departments/Housing/CommunityDevelopment-Block-Grant/Community-Development/CDBGProgram Congestion Mitigation and Air Quality (CMAQ)
Improvement Program
CMAQ provides funding to state and local agencies for
transportation projects that help meet Clean Air Act objectives.
Funded projects must work to reduce congestion and improve area quality in nonattainment or maintenance zones for ozone, carbon monoxide or particulate matter. CMAQ funds can be used for bicycle and pedestrian projects that are included in the metropolitan planning organization (MPO) current transportation plan and transportation improvement program (TIP). Projects can include bicycle and pedestrian facilities that are not exclusively recreational and for outreach related to safe bicycle use. https://www.transportation.gov/sustainability/climate/federalprograms-directory-congestion-mitigation-and-air-quality-cmaq House Transportation & Infrastructure (T&I) Committee
Appropriations
The House T&I Committee invites Members of Congress to request funding for projects in their communities. Project funds can be used for planning, final design, and construction projects. Eligible projects include bicycle & pedestrian infrastructure projects that increase access, strengthen multimodal connections, reduce greenhouse gas emissions, and enhance environmental justice. https://transportation.house.gov/subcommittees/
subcommittee/?ID=107420
Neighborhood Access and Equity Grants
Authorized by the Inflation Reduction Act in August 2022, these grants aim to make roads safer for all modes of transportation.
The purpose of the grant is to reconnect communities that have highways running through them. Funds can be used to redesign highways for all modes, build trails and bike lanes, provide transit connections, install green infrastructure, reduce urban heat islands, and build safety features. https://www.transportation.gov/grants/ rcnprogram/about-neighborhood-access-and-equity-grantprogram https://www.transportation.gov/grants/rcnprogram/aboutneighborhood-access-and-equity-grant-program RAISE Grants
Previously known as the BUILD and TIGER grant, the RAISE grant funds the building and repair of transportation networks. Available through the U.S. Department of Transportation, the RAISE grant allows sponsors at the State and local levels to obtain funding for multi-modal, multi-jurisdictional projects that are more difficult to support through traditional funding initiatives.
https://www.transportation.gov/RAISEgrants
138 671
Reconnecting Communities and Neighborhoods Grant
Program
The Bipartisan Infrastructure Law (BIL) established the new Reconnecting Communities Pilot (RCP) discretionary grant program, funded with $1 billion over the next 5 years. It is the firstever Federal program dedicated to reconnecting communities that were previously cut off from economic opportunities by transportation infrastructure. Funding supports planning grants and capital construction grants, as well as technical assistance, to restore community connectivity through the removal, retrofit, mitigation, or replacement of eligible transportation infrastructure facilities.
Eligible facilities may include a highway, including a road, street, or parkway or other transportation facility, such as a rail line, that creates a barrier to community connectivity, including barriers to mobility, access, or economic development, due to high speeds, grade separations, or other design factors. Planning grants may be used to study the feasibility and impacts of removing, retrofitting, or mitigating an existing eligible facility or to conduct planning activities necessary to design a project to remove, retrofit, or mitigate an existing eligible facility.
https://www.transportation.gov/grants/rcnprogram/about-rcp\ Safe Streets and Roads for All (SS4A)
Established by the Bipartisan Infrastructure Law (BIL), this program funds initiatives that prevent roadway deaths and serious injuries and can be used to carry out items in support of creating safety Action Plans like Vision Zero, and in implementing infrastructure including pilot programs, installing pedestrian and bicycle networks, transforming roadway corridors into Complete Streets, improving the safety of intersections. Up to $1 billion is available each year of the program.
https://www.transportation.gov/grants/SS4A
Surface Transportation Block Grant (STBG)
Extended by the BIL, these grants are used to fund projects that maintain and improve the transportation performance of federalaid highways, bridges, and tunnels, install pedestrian and bicycle infrastructure and implement transit capital projects. Additional Transportation Alternatives* set aside funds for active transportation, and active transportation access to transit improvements. https://www.fhwa.dot.gov/specialfunding/stp/
*Title 23, U.S.C. 101(a)(29) Transportation alternatives. - The term “transportation alternatives” means any of the following activities when carried out as part of any program or project authorized or funded under this title, or as an independent program or project related to surface transportation: (A) Construction, planning, and design of on-road and off- road trail facilities for pedestrians, bicyclists, and other non-motorized forms of transportation, including sidewalks, bicycle infrastructure, pedestrian and bicycle signals, traffic calming techniques, lighting and other safety-related infrastructure, and transportation projects to achieve compliance with the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.).
https://fhwa.dot.gov/map21/docs/title23usc.pdf
139672
Grants- State
PROJECT
Active
Transportation
Program (ATP)
Affordable
Housing And
Sustainable
Communities
Program (AHSC)
California
Department of
Forestry and Fire
Protection (CalFire)
Urban and
Community Forestry
Grants
California
Strategic Growth
Council Regional
Climate
Collaboratives
(RCC) Grant
California
Transportation
Commission Local
Partnership Program
(LPP)
Clean
California
Grant
Clean
Mobility
Options
(CMO)
The Ford Family
Foundation Large
Good Neighbor
Grants
Rubberized
Pavement
Grant
Program
State
Transportation
Improvement
Program (STIP)
Transportation
Development Act
Funds (TDA)
The Urban
Greening
Program
Caltrans
Sustainable
Transportation
Planning Grant
Program
Southern California
Association of
Governments- Go
Human
Transport
Uniform Mit
Fee (TUM
Pilot projects
Parking signage
Shared 1st Street
Controlled alleys
Lighting across Ramsey and 1st St
Wayfinding
Bus stop improvements
Courtyards
Gateways
3rd Street park
Post Office linear park
Ramsey Complete Street- Martin St to 8th St
San Gorgonio Ave two-way cycletrack
San Gorgonio Protected Intersection
Numbered/secondary street improvements (1st, 2nd,
3rd, 4th, Hays, Livingston/6th)
Indoor pedestrian pass-throughs connecting alleys to
1st Street/courtyard expansions. x x
Livingston-Highway ramp reconfiguration for truck
route
Civic Center Expansion
STATE
C
A
B
140 673
Grants- Regional & Federal
PROJECT
Active
Transportation
Program (ATP)
Affordable
Housing And
Sustainable
Communities
Program (AHSC)
California
Department of
Forestry and Fire
Protection (CalFire)
Urban and
Community Forestry
Grants
California
Strategic Growth
Council Regional
Climate
Collaboratives
(RCC) Grant
California
Transportation
Commission Local
Partnership Program
(LPP)
Clean
California
Grant
Clean
Mobility
Options
(CMO)
The Ford Family
Foundation Large
Good Neighbor
Grants
Rubberized
Pavement
Grant
Program
State
Transportation
Improvement
Program (STIP)
Transportation
Development Act
Funds (TDA)
The Urban
Greening
Program
Caltrans
Sustainable
Transportation
Planning Grant
Program
Southern California
Association of
Governments- Go
Human
Transporta
Uniform Miti
Fee (TUM
Pilot projects
Parking signage
Shared 1st Street
Controlled alleys
Lighting across Ramsey and 1st St
Wayfinding
Bus stop improvements
Courtyards
Gateways
3rd Street park
Post Office linear park
Ramsey Complete Street- Martin St to 8th St
San Gorgonio Ave two-way cycletrack
San Gorgonio Protected Intersection
Numbered/secondary street improvements (1st, 2nd,
3rd, 4th, Hays, Livingston/6th)
Indoor pedestrian pass-throughs connecting alleys to
1st Street/courtyard expansions. x x
Livingston-Highway ramp reconfiguration for truck
route
Civic Center Expansion
STATE
C
A
B
amily
Large
hbor
s
Rubberized
Pavement
Grant
Program
State
Transportation
Improvement
Program (STIP)
Transportation
Development Act
Funds (TDA)
The Urban
Greening
Program
Caltrans
Sustainable
Transportation
Planning Grant
Program
Southern California
Association of
Governments- Go
Human
Transportation
Uniform Mitigation
Fee (TUMF)
California Department
of Parks and
Recreation Outdoor
Recreation Legacy
Partnership (ORLP)
Program (Granted by
NPS)
Carbon
Reduction
Program
The Community
Development
Block Grant
(CDBG)
Congestion
Mitigation and
Air Quality
(CMAQ)
Improvement
Program
House
Transportation &
Infrastructure (T&I)
Committee
Appropriations
Neighborhood
Access and Equity
Grants
RAISE
Grants
Reconnecting
Communities and
Neighborhoods
Grant Program
Safe Streets and
Roads for All
(SS4A)
Surface
Transportation
Block Grant
(STBG)
x x
FEDERAL
141674
Cost Estimates -
Full Project Summary and Details
These costs are rough order of magnitude estimates for all aspects of the final design from roadway construction to amenities and irrigation. The following sections break down this cost summary by project with Ramsey Street, 1st Street, Alleys/Courtyards, and the Park. For this cost estimate all gateway elements are excluded.
DESCRIPTION UNIT UNIT COST QUANTITY COST
24" Box Tree EA $1,200.00 675 $810,000.00
Landscaping SF $20.00 65,000 $1,300,000.00
Shrub and groundcover Irrigation SF $16.00 65,000 $1,040,000.00 Irrigation equipment EA $15,000.00 30 $450,000.00
Tree removal EA $2,000.00 40 $80,000.00
Soil CY $65.00 7,200 $468,000.00
Tree Root Vault System + Soil MI $3,650,000.00 0.4 $1,460,000.00 Fencing LF $125.00 600 $75,000.00
Bioswale LF $200.00 2,000 $400,000.00
TOTAL $6,083,000.00
Total in 2023 (rounded to nearest $10,000) $6,080,000.00
DESCRIPTION UNIT UNIT COST QUANTITY COST
Demo (to include all soils, pavements, and miscellaneous removaSF $30.00 210,000 $6,300,000.00 AC Paving with Aggregate Base Ton $400.00 2,710 $1,084,000.00 Concrete Curb and Gutter LF $100.00 30,000 $3,000,000.00 Curb Ramps and Warning Strip EA $10,000.00 60 $600,000.00 Striping LF $6.00 14,000 $84,000.00
Pavement Markings (STOP,YIELD) EA $475.00 50 $23,750.00 Poured Concrete Walk 4" SF $20.00 284,900 $5,698,000.00 Cool Paving for Mural & Mural Materials LS $30,000.00 1 $30,000.00 Ground mural LS $15,000.00 1 $15,000.00
Bicycle Signage EA $500.00 18 $9,000.00
Traffic Signal Modification including Bike Signal Heads and Loops LS $350,000.00 1 $350,000.00 Paving decorative SF $35.00 6,000 $210,000.00
Bike Lanes SF $15.00 40,000 $600,000.00
Median Islands SF $55.00 14,000 $770,000.00
Cool paving SF $15.00 47,700 $715,500.00
Permeable asphalt, subbase, and geotextiles SF $25.00 44,800 $1,120,000.00 TOTAL 20,609,250.00
Total in 2023 (rounded to nearest $10,000) $20,610,000.00
DESCRIPTION UNIT UNIT COST QUANTITY COST
String Lights LF $12.00 14,386 $172,632.00
Pedestrian scale street lights EA $8,000.00 75 $600,000.00 Small Shade Structure (12'X12') SF $250.00 4,800 $1,200,000.00 Trash Receptacle EA $1,800.00 30 $54,000.00
Amenities (Benches, Bike racks, etc.) EA $3,500.00 20 $70,000.00 Map and Wayfinding Signage EA $5,000.00 4 $20,000.00
Bus Shelters EA $35,000.00 4 $140,000.00
Pjt SiEA $50000 30 $1500000
LIGHTING + PEDESTRIAN AMENITIES
ROADWAY + PAVING
LANDSCAPE + STORMWATER
Full Project Cost Summary
LANDSCAPE + STORMWATER $6,080,000.00
ROADWAY + PAVING $20,610,000.00
LIGHTING + PEDESTRIAN AMENITIES $2,710,000.00
SOFT COSTS $3,820,000.00
CONSTRUCTION TOTAL COST $33,220,000.00
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $38,200,000.00 CEQA EXEMPTION DOCUMENTATION $50,000.00
CONTINGENCY (30%) $11,460,000.00
Total in 2023 (Rounded to nearest 10,000) $49,710,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $52,690,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $55,850,000 142 675
Permeable asphalt, subbase, and geotextiles SF $25.00 44,800 $1,120,000.00 TOTAL 20,609,250.00
Total in 2023 (rounded to nearest $10,000) $20,610,000.00
DESCRIPTION UNIT UNIT COST QUANTITY COST
String Lights LF $12.00 14,386 $172,632.00
Pedestrian scale street lights EA $8,000.00 75 $600,000.00 Small Shade Structure (12'X12') SF $250.00 4,800 $1,200,000.00 Trash Receptacle EA $1,800.00 30 $54,000.00
Amenities (Benches, Bike racks, etc.) EA $3,500.00 20 $70,000.00 Map and Wayfinding Signage EA $5,000.00 4 $20,000.00
Bus Shelters EA $35,000.00 4 $140,000.00
Project Signage EA $500.00 30 $15,000.00
Poured in Place Concrete Seat Walls (@Park) LF $275.00 178 $48,950.00 Game Courts SF $20.00 3,900 $78,000.00
Drinking Fountain with Bottle Filler + Pet Bowl EA $15,000.00 1 $15,000.00 Play equipment and surfacing LS $300,000.00 1 $300,000.00 TOTAL $2,713,582.00
Total in 2023 (rounded to nearest $10,000) $2,710,000.00 Subtotal $29,400,000.00
DESCRIPTION UNIT UNIT COST QUANTITY COST
Traffic Control and Traffic Control Plan 1 3% of TTL C $882,000.00 Stormwater Pollution Prevention Plan (SWPPP) Development and 1 3% OF TTL C $882,000.00 Mobilization/Demobilization and Clean-up 1 5% OF TTL C $1,470,000.00 Utilities Relocation/Protection/Coordination 1 2% OF TTL C $588,000.00 TOTAL $3,822,000.00
Total in 2023 (rounded to nearest $10,000) $3,820,000.00
CONSTRUCTION TOTAL COST
Total in 2023 (rounded to nearest $10,000) $33,220,000.00
TOTAL COST
Plans, Specifications, Estimates 1 15% OF TTL C $4,983,000.00 SUBTOTAL $38,203,000.00
Subtotal in 2023 (rounded to nearest 10,000) $38,200,000.00 CEQA Documentation 1 $50,000.00 $50,000.00
Contingency 1 30% OF TTL $11,460,000.00
TOTAL in 2023 $49,710,000.00
Total in 2023 (rounded to nearest $10,000) $49,710,000.00 LIGHTING + PEDESTRIAN AMENITIES
SOFT COSTS
143676
Cost Estimates -
Ramsey Street
0 50 100
4TH
3RD
2ND
1ST
8TH
6TH
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
RAMSEY - VEHICULAR RAMSEYDOWNTOWN CORE RAMSEY- CIVIC
Ramsey - Downtown Core Project
LANDSCAPE + STORMWATER $1,270,000
ROADWAY + PAVING $2,810,000
LIGHTING + PEDESTRIAN AMENITIES $240,000
SOFT COSTS $560,000
CONSTRUCTION TOTAL COST $4,880,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $5,610,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $1,683,000
Total in 2023 (Rounded to nearest 10,000) $7,340,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $7,780,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $8,250,000 Ramsey - Vehicular Project
LANDSCAPE + STORMWATER $390,000
ROADWAY + PAVING $1,400,000
LIGHTING + PEDESTRIAN AMENITIES $180,000
SOFT COSTS $260,000
CONSTRUCTION TOTAL COST $2,230,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $2,560,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $768,000
Total in 2023 (Rounded to nearest 10,000) $3,380,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $3,580,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $3,790,000 Ramsey - Civic Project
LANDSCAPE + STORMWATER $800,000
ROADWAY + PAVING $1,870,000
LIGHTING + PEDESTRIAN AMENITIES $260,000
SOFT COSTS $380,000
CONSTRUCTION TOTAL COST $3,310,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $3,810,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $1,143,000
Total in 2023 (Rounded to nearest 10,000) $5,000,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $5,300,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $5,620,000 Ramsey - Downtown Core Project
LANDSCAPE + STORMWATER $1,270,000
ROADWAY + PAVING $2,810,000
LIGHTING + PEDESTRIAN AMENITIES $240,000
SOFT COSTS $560,000
CONSTRUCTION TOTAL COST $4,880,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $5,610,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $1,683,000
Total in 2023 (Rounded to nearest 10,000) $7,340,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $7,780,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $8,250,000 Ramsey - ALL PROJECTS COMBINED
LANDSCAPE + STORMWATER $2,460,000
ROADWAY + PAVING $6,080,000
LIGHTING + PEDESTRIAN AMENITIES $680,000
SOFT COSTS $1,200,000
CONSTRUCTION TOTAL COST $10,420,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $11,980,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $3,594,000
Total in 2023 (Rounded to nearest 10,000) $15,624,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $16,560,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $17,550,000 144 677
Cost Estimates -
1st Street
0 50 100
4TH
3RD
2ND
1ST
8TH
6TH
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
1ST STREET LIVINGSTON
1st Street Project
LANDSCAPE + STORMWATER $1,410,000
ROADWAY + PAVING $3,010,000
LIGHTING + PEDESTRIAN AMENITIES $340,000
SOFT COSTS $40,000
CONSTRUCTION TOTAL COST $4,800,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $5,520,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $1,656,000
Total in 2023 (Rounded to nearest 10,000) $7,230,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $7,660,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $8,120,000 145678
0 50 100
4TH
3RD
2ND
1ST
8TH
6TH
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
ALLEYS/
COURTYARDS
Alleys / Courtyards
LANDSCAPE + STORMWATER $150,000
ROADWAY + PAVING $1,480,000
LIGHTING + PEDESTRIAN AMENITIES $920,000
SOFT COSTS $330,000
CONSTRUCTION TOTAL COST $2,880,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $3,310,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $993,000
Total in 2023 (Rounded to nearest 10,000) $4,350,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $4,610,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $4,890,000 Cost Estimates -
Alleys/Courtyards
146 679
0 50 100
4TH
3RD
2ND
1ST
8TH
6TH
SAN GORGONIO
RAMSEY
MARTIN
ALESSANDRO
HAYS
LIVINGSTON
PARK
Park
LANDSCAPE + STORMWATER $580,000
ROADWAY + PAVING $150,000
LIGHTING + PEDESTRIAN AMENITIES $470,000
SOFT COSTS $160,000
CONSTRUCTION TOTAL COST $1,360,000
TOTAL COST WITH PLANS, SPECIFICATIONS, ESTIMATES $1,560,000 CEQA EXEMPTION DOCUMENTATION $50,000
CONTINGENCY (30%) $468,000
Total in 2023 (Rounded to nearest 10,000) $2,080,000
Total in 2024 (Rounded to nearest 10,000) - 6% Esc. $2,200,000 Total in 2025 (Rounded to nearest 10,000) - 6% Esc. $2,330,000 Cost Estimates -
Park
147680
SCAG Go Human Pilot
Projects
Go Human is a community engagement program with the
goals of reducing traffic collisions in Southern California and encouraging people to walk and bike more. SCAG’s Go Human Kit of Parts Lending Library provides pop-up materials to temporarily demonstrate potential and planned street design treatments and safety infrastructure to create safer and more inviting public spaces.
The Go Human Kit of Parts includes materials to showcase five street treatments. The street treatments include a parklet, curb extension (bulb- out), median refuge island, artistic crosswalk, and separated bike lane. The Kit of Parts are made of portable, light-weight materials that are easy to transport and assemble.
Temporary safety demonstrations create opportunities for residents to experience streets that are re-designed for safety in live traffic settings, test out, refine, and identify support for improvements. 1 1 SCAG Go-Human
Bike Lane Curb Extension
Popup areas Popup areas
Bike Lane
Decorative Crosswalk Strips Parklet
Decorative Crosswalk Strips
148 681
4 Parts
GLOSSARY OF TERMS
5. Parklet Railing
9. Bike Lane Marker
13. Shark teeth (Crosswalk)
6. Stanchion
10. Decorative
Crosswalk Strips
7. Bike Lane Railing
11. End Mesh
(Bulb out)
8. Bike Lane Bollard
12. Circles (Bulb Out)
1. Plane 2. End Plane
(Parklet, left)
3. End Plane
(Parklet, Right)
4. Nose Plane
(Ped. Island)
5 Accessories
Hardware
18. Tape
21. Bollard
19. Post
22. Cafe Table 23. Umbrella 23. Treatment Sign
20.Bike Lane Bracket
14. Pedestal 15. Threaded cap 16. Screw 17. Parklet Bracket Glossary of Terms
Diagram of parts and accessories for Go Human kits from SCAG Final Kit of Parts Design Guide 149682
Go Human 1st St and Ramsey St
This Go Human demonstration would showcase the pedestrian-oriented 1st Street along with the traffic calming and Complete Street designs for Ramsey Street. Additional amenities such as traffic cones, additional bike lane markers, K Rails, planters, tape, street furniture/umbrellas, and turf would be used to enhance the event to more accurately represent the design intent of the plan.
This demonstration would use several of the Go Human Kit elements including:
• Bike Bollards and Railings (20x each)
• Bike Lane Marker (2x)
• Curb Extensions (2x)
• Decorative Crosswalk (1 set of 12 stripes)
• Parklet (1x)
• Necessary Tape/hardware to restripe/assemble
• Yellow Tape - apx 145’ to mark new centerline
• Black Tape - apx 120’ to cover existing yellow from 1st to east end of alley • Black Tape - apx 150 sqft to cover three sharrows
• Green Paint for conflict striping
150 683
PARKLET -
KIT B (1/1)
EXTRA TABLES,
CHAIRS,
UMBRELLAS
TURF, GAMES,
POPUP TENTS
CROSSWALK -
KIT B (1/1)
CURB EXT - KIT B (2/2)
EXTRA K RAILS TO
CLOSE STREET
EXTRA K RAILS TO CLOSE STREET
CURB EXT - KIT B (1/2)
EXTRA CONES FOR EDGE
OF BIKE LANE/NEW SW
EDGE (5’ FROM CURB)
EXTRA PLANTERS
EXTRA STREET FURNITURE
EXTRA CONES FOR CURB
EXTENSION/PARKING END
EXTRA BIKE MARKER BIKE LANE MARKER B (2/2)
4’ SPACE BETWEEN EXISTING CURB AND
CONES TO REPLICATE SW EXTENSION
WITH BENCHES AND PLANTERS
CIRCLES FROM CURB EXTENSIONS (9 TOTAL)
TEMPORARY YELLOW LINE FOR CHICANE ( 9’ FROM EXISTING)
TEMPORARY PARKING T’S 5X (FOR SHOW) BLACK TAPE COVER UP SHARROWS Chicane end/ parking T’s inline
with corner of building. Chicane is
18’ out from curb
TEMPORARY PARKING T’S
4X (FOR SHOW)
BIKE LANE MARKER B (1/2)
BIKE LANE RAILINGS AND BOLLARDS
(20 EACH /KIT) 10’ SPACING
10’ 10’ 10’ 11’ 11’ 4’ 3’ 3’ 5’ 5’ 5’
3’ 5’ 5’
8’
9’
11’
Chicane ends
apx 20’ from
alley/18’ out
from curb
Chicane ends apx
15’ from alley
Curb extension/parking
T’s apx 20’ from
crosswalk
EXTRA GREEN
MARKINGS
FOR BIKE LANES
BLACK TAPE OVER EXISTING CENTER
LINE AND BIKE LANE POCKET
10’ 8’
10’ 8’
Go Human drawing for 1st St and Ramsey demonstration
RAMSEY ST
2ND ST
1ST ST
151684
Go Human Alley, Courtyard and Ramsey St
This Go Human demonstration would showcase the Alley and Courtyard along with the traffic calming and Complete Street designs for Ramsey Street. Additional amenities such as traffic cones, additional bike lane markers, K Rails, planters, tape, street furniture/umbrellas, and turf would be used to enhance the event to more accurately represent the design intent of the plan.
This demonstration would use several of the Go Human Kit elements including:
• Bike Bollards and Railings (20x each)
• Bike Lane Marker (2x)
• Curb Extensions (2x)
• Decorative Crosswalk (1 set of 12 stripes)
• Parklet (1x)
• Necessary Tape/hardware to restripe/assemble
-Yellow Tape - apx 200’ to mark new centerline
-Black Tape - apx 300’ to cover existing marked section of yellow and bike lane pocket lines -Black Tape - apx 200 sqft to cover two sharrows and bike lane marker -Green Paint for conflict striping
152 685
CURB EXT - KIT A (2/2)
PARKLET -
KIT A (1/1)
CURB EXT - KIT A (1/2)
EXTRA K RAILS
K RAIL TO REPRESENT
CONTROLLED ALLEY
EXTRA TABLES,
CHAIRS, UMBRELLAS
EXTRA TABLES, CHAIRS,
UMBRELLAS TURF,
GAMES, POPUP TENTS
TEMPORARY CENTER LINE
BLACK TAPE OVER EXISTING CENTER LINE
EXTRA CONES
EXTRA
CONES
BIKE LANE RAILINGS AND BOLLARDS
(20 EACH /KIT) 10’ SPACING
CROSSWALK FROM
MEDIAN ISLANDKIT A (1/1)
BIKE LANE MARKER -
KIT A (2/2)
BIKE LANE
MARKER -
KIT A (1/2)
EXTRA STREET
FURNITURE
EXTRA GREEN TMARKINGS FOR BIKE LANES 11’ 11’ 5’ 3’ 3’ 3’ 5’ 7’ 10’ 10’ 10’
EXTRA BIKE MARKER
EXTRA BIKE MARKER
Go Human drawing for Alley, Courtyard and Ramsey St demonstration
RAMSEY ST
1ST ST
1ST ST
153686
Wayfinding
Wayfinding is the process of determining and following a path or route between an origin and a destination, often intended for pedestrians and cyclists and for assisting people driving cars locate parking and other key destinations. This means that wayfinding helps people get to the destinations they desire, whether it be parking lots off Main Street or downtown attractions. This is achieved with signage and maps, special lettering, colors, symbols, iconic shapes, texture, and surface treatment working in unison to highlight key locations, attractions, and services, and provide route confirmation. Banning should establish a wayfinding signage program to review existing signage and plan for new or upgrade existing, wayfinding signage in Downtown Banning and across the city.
The following sections are recommendations for the Downtown area but may be subject to change following the implementation of a City Wayfinding Program. Roadway-oriented signage should be designed to comply with CA MUTCD design standards. It is important to note that the MUTCD allows for communities to create community-sensitive wayfinding. Community Wayfinding allows custom colors and enhancement markers (logos). DOT encourages transportation agencies to go beyond the minimum requirements, and proactively provide convenient, safe, and context-sensitive facilities that help roadway users of all types, ages, and abilities of all ages and utilize universal design characteristics (2010).
Design recommendations for wayfinding signage in Banning include:
• Signage should be designed at a human scale with attention to detail and craftsmanship. • Pedestrian-oriented signs should comply with standard clearances from other street elements and comply with ADA requirements.
• Wayfinding signage should be placed near important intersections, public plazas, or other areas with high pedestrian volume.
• Wayfinding signage should clearly communicate the locations of nearby destinations, by means such as arrows, infographics, and vicinity maps.
• Avoid placing too many signs on the street, which can cause visual clutter and confusion to people. • Externally illuminated signs should be designed to minimize glare. The reflective coating should be used on other signs to minimize glare.
Examples of wayfinding signage families which should be simple, intuitive, and approachable, with a consistent design language between elements.
154 687
Example of wayfinding signage families
Additional Wayfinding Information
The Manual of Uniform Traffic Devices, Section 2D.50 allows for community-sensitive wayfinding but there are basic specific guidelines that must be followed.
The California Manual on Uniform Traffic Control Devices or CA MUTCD is the state standard (based on the national MUTCD) for all traffic control devices installed on any street, highway, bikeway, or private road open to public travel. Both on-street and off-street bicycle facilities are required to follow the standards within the CA MUTCD. Devices should be designed so that:
• Size, shape, color, composition, lighting or retroreflection, and contrast are combined to draw attention to the devices. • Size, shape, color, and simplicity of message combine to produce a clear meaning.
• Legibility and size combine with placement to permit adequate time for response.
• Uniformity, size, legibility, and reasonableness of the message combine to command respect.
• Options for customizing signs while adhering to the CA MUTCD include adding unique mounting structures or an identifying enhancement marker.
• While the CA MUTCD provides standards and guidelines for the design, size, and content of wayfinding signs, many jurisdictions have implemented unique signs to enhance visibility or reinforce local identity.
• Creative wayfinding elements enhance community identity and pride, reflect local values and character, and may provide more helpful information than signs which strictly follow the basic guidance of the CA MUTCD
155688
689
BANNING
DOWNTOWN REVITALIZATION
& COMPLETE STREETS PLAN
Appendix
November 2023
PREPARED BY:
Alta Planning + Design
The Arroyo Group
RCLCO
690
CONTENTS
Section Diagrams �������������������������������������������������������������������������������������� 3 Community Engagement����������������������������������������������������������������������� 68 Mobility Alternatives ������������������������������������������������������������������������������� 90 Development Sites��������������������������������������������������������������������������������� 100 Toolkit�������������������������������������������������������������������������������������������������������114 Plantings ��������������������������������������������������������������������������������������������������122 Development Opportunity & Existing Conditions Analysis ����������������125 2 © 2023 California Department of Transportation and the City of Banning. All Rights Reserved.691
SECTION DIAGRAMS
3692
4 SECTION DIAGRAMS - RAMSEY STREET
Ramsey Street between 8th Street and Martin Street is the historic heart of downtown Banning. The street in less than a mile changes from highway connection to downtown main street with various businesses.
Right-of-way length correlates to these areas and as shown in more analysis in this section, the alignment of sidewalks and streets changes with gaps throughout. There is much opportunity for reallocation and rearrangement of the right-of-way to make Ramsey a complete street for all users.
693
5 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
694
1 2 3
6 Eastbound Westbound
Side
8’ 24’ 12’ 12’ 4’ 12’ 8
Sidewalk Left Turn Lane Travel Lane Bike Right Turn Lane Lane
Travel Lane
8’ 24’ 10’ 22’ 8’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 64’ Road Width
80’ ROW
56’ Road Width
72’ ROW
Eastbound Westbound
2 1
SAN GO
0 400’
Eastbound Westbound
Sidewalk
8’ 24’ 12’ 12’ 4’ 12’ 8’
Sidewalk Left Turn Lane Travel Lane Bike Right Turn Lane Lane
Travel Lane
8’ 24’ 10’ 22’ 8’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 64’ Road Width
80’ ROW
56’ Road Width
72’ ROW
Eastbound Westbound
2 1
0 400’ 80
Ramsey & 8th St
At the western edge of the study area, Ramsey St meets 8th St at a busy and dangerous intersection. In 2014 a 16 year old male was hit crossing the intersection headed south by a pickup truck headed west. In 2021 a driver hit a 14 year old female pedestrian headed south.
The street width here on Ramsey changes from 56’ to 64’ to accommodate the left and right turns lanes WB. These in addition to a straight travel lane are 12’ with a 4’ “pocket” class II bike lane at the intersection east and westbound.
The total ROW for this section spans from 72’ to 80’ including sidewalks which are 8’ meeting ADA requirements but are inadequate in places where the road width changes leaving the sidewalk without a complete path.
There is a bus stop with shelter on the northeast corner of Ramsey and a bus stop sign with no amenities opposite on the south west side.
Existing Conditions Ramsey St and 8th St 64’ 80’
12’ 24’ 12’
4’
12’
56’
72’
10’ 24’ 22’
Class II Bikeway Inadequate Sidewalk Vacant Lot
1 2
RAMSEY ST
8TH ST
VACANT LOT
1 2 3
0 50’ 100’
OPPORTUNITY FOR BIKE
CONFLICT STRIPING
INADEQUATE SIDEWALK -
NEEDS IMPROVEMENT
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY TO IMPROVE
BIKE FACILITY
OPPORTUNITY TO IMPROVE
EXISTING BUS STOP & SHELTER
OPPORTUNITY FOR GATEWAY DESIGN
AS ENTRY POINT TO DOWNTOWN
12’ VEHICLE LANES
CONSTRAINTS
1 Class II Bikeway 2 Inadequate Sidewalk 3 Vacant Lot
695
7 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and 8th St 64’ 80’
12’ 24’ 12’
4’
12’
56’
72’
10’ 24’ 22’
1 2
RAMSEY ST
8TH ST
VACANT LOT
1 2 3
0 50’ 100’
OPPORTUNITY FOR BIKE
CONFLICT STRIPING
INADEQUATE SIDEWALK -
NEEDS IMPROVEMENT
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY TO IMPROVE
BIKE FACILITY
OPPORTUNITY TO IMPROVE
EXISTING BUS STOP & SHELTER
OPPORTUNITY FOR GATEWAY DESIGN
AS ENTRY POINT TO DOWNTOWN
12’ VEHICLE LANES
CONSTRAINTS
696
6’ 24’ 10’ 22’ 6’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 62’ Road Width
76’ ROW
56’ Road Width
68’ ROW
Eastbound Westbound
3 4
8’ 22’ 10’ 30’ 6’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 6’ 24’ 10’ 22’ 6’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 62’ Road Width
76’ ROW
56’ Road Width
68’ ROW
Eastbound Westbound
Eastbound Westbound
3 4
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
0 400’
Existing Sections
Ramsey & 6th St
Ramsey near 6th St has no bicycle pedestrian crashes from 2010-2021. Street widths are 56’ and 62’ in this section with ROW of 68’ and 76’ respectively. A mid block crossing of Ramsey on the east side of 6th St provides pedestrians the ability to cross but is minimal in treatment with “ladder” treatment and only one sign on the right side of street in either direction. The crossing of 6th St is even less apparent with only a stop sign and standard markings. Sidewalks are 6’ for most of this section, causing tight conditions for all users, especially those with mobility challenges due to hydrants, light posts, benches, and trash recycling bins blocking the sidewalk.
The most significant issue with the mid-block crossing of Ramsey is the north side in which the crosswalk runs into cracked and uneven sidewalk with no real curb cut between two driveways. The north sidewalk here is non linear east to west causing pedestrians to navigate arduous curb and sidewalk conditions.
Nearby on the north side of Ramsey east of the entrance to 6th St is a bus stop with bench but no shelter which could be added in the empty space behind it or with sidewalk widening.
Existing Conditions Ramsey St and 6th St
0 50’ 100’
56’
68’
10’ 24’ 22’
6’
64’
Significant Sidewalk Issue Potential for Sidewalk Extension & Parklet/Parkway
1 Opportunity for Bus Shelter 2 3
3 4
RAMSEY ST
6TH ST
VACANT LOT
VACANT LOT
VACANT LOT
2 62’
76’
10’ 22’ 30’
3 1
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP. SMALL DRIVEWAYS HAVE
NON-LEVEL SLOPES
CONSTRAINED 6’ SIDEWALK CONDITIONS;
HISTORIC STREET LIGHTS CREATE NARROW
CONDITIONS OPPORTUNITY TO ADD
BUS SHELTER TO BUS STOP
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS
OPPORTUNITY FOR OFF-STREET PARKING
AND LESS ON-STREET PARKING
SIGNIFICANT SIDEWALK
ISSUE; NOT ADA COMPLIANT
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY TO BRING
SIDEWALK LEVEL ACROSS
OPPORTUNITY FOR
PARKLET OR PARKWAY
OPPORTUNITY FOR PEDESTRIAN
REFUGE ISLAND AND RECTANGULAR
RAPID FLASHING BEACON (RRFB)
8 697
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and 6th St
0 50’ 100’
56’
68’
10’ 24’ 22’
6’
64’
3 4
RAMSEY ST
6TH ST
VACANT LOT
VACANT LOT
VACANT LOT
2 62’
76’
10’ 22’ 30’
3 1
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP. SMALL DRIVEWAYS HAVE
NON-LEVEL SLOPES
CONSTRAINED 6’ SIDEWALK CONDITIONS;
HISTORIC STREET LIGHTS CREATE NARROW
CONDITIONS OPPORTUNITY TO ADD
BUS SHELTER TO BUS STOP
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS
OPPORTUNITY FOR OFF-STREET PARKING
AND LESS ON-STREET PARKING
SIGNIFICANT SIDEWALK
ISSUE; NOT ADA COMPLIANT
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY TO BRING
SIDEWALK LEVEL ACROSS
OPPORTUNITY FOR
PARKLET OR PARKWAY
OPPORTUNITY FOR PEDESTRIAN
REFUGE ISLAND AND RECTANGULAR
RAPID FLASHING BEACON (RRFB)
9698
6’ 24’ 10’ 22’ 6’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 56’ Road Width
68’ ROW
Eastbound Westbound
62’ Road Width
76’ ROW
5 6
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
0 400’
Existing Sections
6’ 24’ 10’ 22’ 6’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 56’ Road Width
68’ ROW
Eastbound Westbound
8’ 22’ 10’ 30’ 6’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk 62’ Road Width
76’ ROW
Eastbound Westbound
5 6
Existing Conditions Ramsey St and 4th St
0 50’ 100’
62’
76’
10’ 22’ 30’
70’
56’
10’ 24’ 22’
1 Opportunity for Bus Shelter 2 Inconsistent Sidewalk 3 Intersection
RAMSEY ST
4TH ST
VACANT LOT - IN DISCUSSION FOR LAUNDROMAT/ICE
CREAM SHOP
VACANT LOT
1 2 3
RED CURB, TYP.
OPPORTUNITY TO IMPROVE
BUS STOP/SHELTER
INCONSISTENT SIDEWALK
AND MULTIPLE DRIVEWAYS
SURROUNDING BUS STOP
CREATES UNSAFE
PEDESTRIAN CONDITIONS
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS, TYP.
OPPORTUNITY TO EXPAND
SIDEWALK; COULD POTENTIALLY
IMPROVE INTERSECTION AND
REALIGN CROSSWALK OPPORTUNITY TO ADD
BUS SHELTER TO BUS STOP
5 6
Ramsey & 4th St
One pedestrian was involved in a crash at the intersection of Ramsey and 4th St street in 2018 in which a driver headed north taking a left turn hit a 47 year old female pedestrian. The condition at this intersection is similar to others along Ramsey with standard low visibility markings and no pedestrian signage. Travel lanes are wide, accommodating parking in some areas between driveways. The street width ranges from 56’ and 62’ with ROW of 68’ and 76’ respectively. The sidewalk again on the north side of Ramsey is linearly inconsistent with a jog approximately 125’ west of the intersection where a vacant property, potentially a laundromat or other business abuts the exit of the Bella Vista Cottages and Apartments. Sidewalks in this section are mostly 6’ leading again to narrow conditions for pedestrians along the busy street.
There is one bus stop and bench outside of the Bella Vista property which could be improved with a shelter and moved out of the sidewalk using the open space behind. The opposite side of the street to the west has a stop with shelter and bench directly in front of the greyhound station that shares parking and building with the Riverside County Department of Public Services.
Potentially some, or many of those using these services commute to and from on bus and could benefit from real-time bus headway information. 10 699
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and 4th St
0 50’ 100’
62’
76’
10’ 22’ 30’
70’
56’
10’ 24’ 22’
RAMSEY ST
4TH ST
VACANT LOT - IN DISCUSSION FOR LAUNDROMAT/ICE
CREAM SHOP
VACANT LOT
1 2 3
RED CURB, TYP.
OPPORTUNITY TO IMPROVE
BUS STOP/SHELTER
INCONSISTENT SIDEWALK
AND MULTIPLE DRIVEWAYS
SURROUNDING BUS STOP
CREATES UNSAFE
PEDESTRIAN CONDITIONS
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS, TYP.
OPPORTUNITY TO EXPAND
SIDEWALK; COULD POTENTIALLY
IMPROVE INTERSECTION AND
REALIGN CROSSWALK OPPORTUNITY TO ADD
BUS SHELTER TO BUS STOP
5 6
11700
Sidewalk Left Turn Lane Travel Lane Sidewalk
6’ 16’ 10’ 22’ 6’
Travel Lane
56’ Road Width
72’ ROW
48’ Road Width
60’ ROW
Eastbound Westbound
8 7
Sidewalk Left Turn Lane Travel Lane Sidewalk
6’ 16’ 10’ 22’ 6’
Travel Lane
10’ 24’ 32’ 6’
Sidewalk Travel Lane Travel Lane Sidewalk
56’ Road Width
72’ ROW
48’ Road Width
60’ ROW
Eastbound Westbound
Eastbound Westbound
8 7
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
0 400’
Existing Conditions Ramsey St and 3rd St
0 50’ 100’
56’
72’
24’ 32’
48’
60’
16’ 10’ 22’
7’
58’ 116’
1 Opportunity for Parklet or Parkway 2 Opportunity for Curb Extension 3 Opportunity for Sidewalk Extension 7 8
RAMSEY ST
3RD ST
VACANT LOT IN DISCUSSION FOR SMALL
MARKET
IN DISCUSSION FOR CORNER
RESTUARANT ON BOTTOM
FLOOR
BOYS AND GIRLS CLUB LOT
SEE SHEETS XX FOR CONCEPTS
1 2 3
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
ANGLED PARKING
ALLEYWAY, TYP.
OPPORTUNITY FOR
PARKLET OR PARKWAY RED CURB, TYP.
OPPORTUNITY TO ADD
CURB EXTENSION
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR
BUS SHELTER
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS, TYP.
OPPORTUNITY TO
EXTEND SIDEWALK
OPPORTUNITY TO
INCLUDE SITE AND ALLEY
Ramsey & 3rd St
The intersection of Ramsey and 3rd St is less intense only having travel lanes and no specified turn lanes. Sharrows on Ramsey are the standard causing cyclists to navigate traffic. The street widths in this section are 48’ and 56’ with ROW at 60’ and 72’ respectively. Opportunities for curb extensions exist at this and many other intersections along Ramsey given the wide street conditions.
There is a bus stop with bench on the southeast corner of Ramsey and 3rd St in front of a vacant lot west of the Boys and Girls Club which could be improved with a shelter. Between the vacant lot and the Boys and Girls Club is an Alley which has potential to be activated with art and other pedestrian oriented amenities. 12 701
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and 3rd St
0 50’ 100’
56’
72’
24’ 32’
48’
60’
16’ 10’ 22’
7’
58’ 116’
7 8
RAMSEY ST
3RD ST
VACANT LOT IN DISCUSSION FOR SMALL
MARKET
IN DISCUSSION FOR CORNER
RESTUARANT ON BOTTOM
FLOOR
BOYS AND GIRLS CLUB LOT
SEE SHEETS XX FOR CONCEPTS
1 2 3
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
ANGLED PARKING
ALLEYWAY, TYP.
OPPORTUNITY FOR
PARKLET OR PARKWAY RED CURB, TYP.
OPPORTUNITY TO ADD
CURB EXTENSION
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR
BUS SHELTER
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS, TYP.
OPPORTUNITY TO
EXTEND SIDEWALK
OPPORTUNITY TO
INCLUDE SITE AND ALLEY
13702
10’ 24’ 34’ 6’
Sidewalk Travel Lane Travel Lane Sidewalk
10’ 25’ 12’ 5’ 16’ 6’
Sidewalk Travel Lane Bike Right Turn Lane Sidewalk
Lane
Travel Lane
58’ Road Width
74’ ROW
58’ Road Width
74’ ROW
Eastbound Westbound
Eastbound Westbound
9 10
SAN GORG
AL
0 400’
10’ 24’ 34’ 6’
Sidewalk Travel Lane Travel Lane Sidewalk
10’ 25’ 12’ 5’ 16’ 6’
Sidewalk Travel Lane Bike Right Turn Lane Sidewalk
Lane
Travel Lane
58’ Road Width
74’ ROW
58’ Road Width
74’ ROW
Eastbound Westbound
Eastbound Westbound
9 10
0 400’
Existing Conditions Ramsey St and 2nd St + 1st St
0 50’ 100’
58’
12’ 25’
5’
16’
34’
74’74’
24’
Crosswalk Realignment or 2 Turn Lane and Bike Lane 3 Opportunity for Bus Shelter Curb Extension 1 9 10
RAMSEY ST
2ND ST
1ST ST
IN DISCUSSION FOR
CORNER RESTUARANT
ON BOTTOM FLOOR
1 2 3
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP.
ALLEYWAY
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY TO REALIGN
CROSSWALK OR ADD CURB
EXTENSION
OPPORTUNITY TO
REPURPOSE TURN LANE
INCONSISTENT WITH
EXISTING CLASS III
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR
BUS SHELTER
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
ANGLED PARKING
PERPENDICULAR PARKING
Ramsey & 2nd St/1st St
The street in the section of Ramsey between 2nd and 1st St street is 58’ wide with a ROW of 74’. At the intersection of 2nd St westbound is a “pocket” bike lane between a 16’ right turn and 12’ travel lane. Again, due to the inconsistency of the northern sidewalk, geometry of intersections is misaligned.
The north eastern corner of the intersection of 2nd St and Ramsey is shifted north causing the crosswalks to be slightly angled. Realignment of the intersection with curb extensions would give consistency to Ramsey and make navigation for all users easily understood. Additionally the southern sidewalk on Ramsey here is 6’ and should be widened to accommodate more pedestrians in the heart of downtown.
The intersection of Ramsey and 1st St has artwork in the middle and is an example of how art can bring excitement to a street and visually slow drivers via conditions oriented towards non automobile users. There are two bus stops with benches in this section providing access to downtown. One is on the northwest corner of Ramsey and 2nd St, while the other is on the northwest corner of Ramsey and 1st St. These stops could potentially be combined due to close proximity, allowing for more investment at one stop rather than two approximately 300’ apart.
14 703
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and 2nd St + 1st St
0 50’ 100’
58’
12’ 25’
5’
16’
34’
74’74’
24’
9 10
RAMSEY ST
2ND ST
1ST ST
IN DISCUSSION FOR
CORNER RESTUARANT
ON BOTTOM FLOOR
1 2 3
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP.
ALLEYWAY
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY TO REALIGN
CROSSWALK OR ADD CURB
EXTENSION
OPPORTUNITY TO
REPURPOSE TURN LANE
INCONSISTENT WITH
EXISTING CLASS III
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR
BUS SHELTER
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
ANGLED PARKING
PERPENDICULAR PARKING
15704
12’
Sidewalk
17’ 10’ 20’ 11’
Travel Lane Left Turn Lane Travel Lane Sidewalk
Hamilton Park
56’ Road Width
74’ ROW
48’ Road Width
70’ ROW
Eastbound Westbound
12 11
12’
Sidewalk
17’ 10’ 20’ 11’
Travel Lane Left Turn Lane Travel Lane Sidewalk
Varies 6’ 20’ 10’ 12’ 14’
Sidewalk Carpenter
Hamilton Park
Travel Lane Left Turn Lane Travel Lane Right Turn Lane
Existing Sections
56’ Road Width
74’ ROW
48’ Road Width
70’ ROW
Eastbound Westbound
Eastbound Westbound
12 11
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
0 400’
Existing Conditions Ramsey St and San Gorgonio Ave
0 50’ 100’
48’
20’ 10’ 18’
56’
10’ 12’ 14’ 20’
74’
70’
1 Obstructed for Parklet or Parkway 2 Opportunity for Curb Extension Opportunity for Active Transportation Space and Downtown Gateway
3 11 12
RAMSEY ST
1 2
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP.
OPPORTUNITY TO DIRECT
ON-STREET PARKING TO
OFF-STREET PARKING
PARK OPPORTUNITY
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY TO REMOVE
ON-STREET PARKING DUE TO
INCONSISTENT CURB MARKINGS
3 Ramsey & San Gorgonio
Another major intersection of downtown is Ramsey and San Gorgonio Ave. San Gorgonio connects the south side of Banning on the other side of I-10 that runs east-west just south of Livingston and the study area. San Gorgonio is the middle of the three crossings that span the approximate mile of downtown with the others being 8th St Street at the west and Hargrave Street to the east. This results in more traffic coming through this intersection and is a direct connection point along the route between middle, elementary schools north of Ramsey and the high school to the south.
Similar opportunities exist here for curb extensions, and bike lanes, in addition to others more unique to this segment like the presence of Carpenter Hamilton Park on the northeast corner of the intersection.
Another opportunity is the alley at the historic Fox Theater which opened in 1928 1 and has potential to be a vibrant pedestrian oriented space.
1 CinemaTreasures.org- 2010
16 705
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and San Gorgonio Ave
0 50’ 100’
48’
20’ 10’ 18’
56’
10’ 12’ 14’ 20’
74’
70’
11 12
RAMSEY ST
1 2
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP.
OPPORTUNITY TO DIRECT
ON-STREET PARKING TO
OFF-STREET PARKING
PARK OPPORTUNITY
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY TO REMOVE
ON-STREET PARKING DUE TO
INCONSISTENT CURB MARKINGS
3 17706
8’ 20’ 12’ 12’ 26’ 8’
Sidewalk Travel Lane/Bus Boarding Travel Lane Left Turn Lane Travel Lane Sidewalk 10’ 20’ 10’ 26’ 7’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk Existing Sections
56’ Road Width
73’ ROW
70’ Road Width
86’ ROW
Eastbound Westbound
Eastbound Westbound
13 14
SAN GORG
0 400’ 800’
8’ 20’ 12’ 12’ 26’
Sidewalk Travel Lane/Bus Boarding Travel Lane Left Turn Lane Travel Lane 10’ 20’ 10’ 26’ 7’
Sidewalk Travel Lane Center Turn Lane Travel Lane Sidewalk Existing Sections
56’ Road Width
73’ ROW
70’ Road Width
86’ ROW
Eastbound Westbound
Eastbound Westbound
13 14
0 400’
Existing Conditions Ramsey St and Alessandro St
0 50’ 100’
70’
12’ 12’ 25’ 21’
86’
73’
56’
10’ 26’ 20’
1 Opportunity for High Visibility Crossing Opportunity for More Active Modes Street Allocation
2 Wide Street Induces Speeding With
25 MPH Limit
3 13
14 RAMSEY ST
ALESSADNDRO ST
1 2
3 BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
VACANT LOT
RED CURB, TYP.
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
Ramsey & Alessandro
Ramsey between San Gorgonio and Alessandro has a street width that changes due to the bus stop and what appears to be parking. The street width goes from 56’ to 70’ heading west with ROW of 73’ and 86’ respectively. The street in the bump-out adjacent to the bus stop could be transformed into other uses ranging from formal parking, to parklets, or active transportation lane. The intersection of Alessandro and Ramsey could be improved with high visibility crosswalks. 18 707
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and Alessandro St
0 50’ 100’
70’
12’ 12’ 25’ 21’
86’
73’
56’
10’ 26’ 20’
13 14
RAMSEY ST
ALESSADNDRO ST
1 2
3 BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
VACANT LOT
RED CURB, TYP.
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
19708
Ramsey & Martin
Ramsey at the end of the study area at Martin is 56’ wide with a ROW of 69’ Improvements to this intersection include high visibility crossings and wider sidewalk on the south side of Ramsey. Curb extensions at the intersection could also provide safer and shorter crossing at this point of Ramsey which might have higher speeds as it is where traffic comes in and out of downtown.
8’ 20’ 12’ 12’ 12’ 5’
Sidewalk Travel Lane Left Turn Lane Travel Lane Right Turn Lane Sidewalk 8’ 20’ 12’ 12’ 26’
Sidewalk Right Turn Lane Travel Lane Left Turn Lane Travel Lane Existing Sections
70’ Road Width
86’ ROW
56’ Road Width
69’ ROW
Eastbound Westbound
Eastbound Westbound
15 16
SAN GORG
0 400
8’ 20’ 12’ 12’ 12’ 5’
Sidewalk Travel Lane Left Turn Lane Travel Lane Right Turn Lane Sidewalk 8’ 20’ 12’ 12’ 26’ 8’
Sidewalk Right Turn Lane Travel Lane Left Turn Lane Travel Lane Sidewalk Existing Sections
70’ Road Width
86’ ROW
56’ Road Width
69’ ROW
Eastbound Westbound
Eastbound Westbound
15 16
0 400’ 800’
Existing Conditions Ramsey St and Martin St
0 50’ 100’
1 Opportunity for Curb Extension70’
26’ 12’ 12’ 20’
56’
12’ 12’ 12’ 20’
69’
86’
8 & 5
15 16
RAMSEY ST
MARTIN ST
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP.
OPPORTUNITY FOR CURB EXTENSION
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
1 20 709
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
Existing Conditions Ramsey St and Martin St
0 50’ 100’
70’
26’ 12’ 12’ 20’
56’
12’ 12’ 12’ 20’
69’
86’
15 16
RAMSEY ST
MARTIN ST
BUS STOP + BUS SHELTER BUS STOP + BENCH BUS STOP
RED CURB, TYP.
OPPORTUNITY FOR CURB EXTENSION
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
1 21710
22 SECTION DIAGRAMS - 4TH-1ST STREETS
The streets connecting north-south from Livingston to Ramsey and Hays provide access to the “back of house” nature of Livingston, as well as the downtown heart of Ramsey. Parking can be found on all of these streets in various forms but not always optimized which if done well, could add more parking to these streets and remove some from Ramsey creating a more pedestrian and non automobile focused downtown center.
711
23 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
712
4th St & Livingston/Ramsey
The segment of 4th St between Livingston and Ramsey has faint turn lanes and no designated parking. It’s sandwiched between the large parking lot of the Riverside County Department of Public Social Services and a car mechanic/ vacant lot. The street is 64’ with an 80’ ROW. Completing the sidewalk along the vacant lot will be necessary to make this a functioning street of downtown. 6’ 26’ 38’ 8’
Sidewalk Travel Lane Travel Lane Sidewalk
Southbound
64’ Road Width
78’ ROW
Sidewalk/Parkway Travel Lane Travel Lane
16’ 28’ 12’ 28’
Turn Lane
68’ Road Width
100’ ROW
Southbound Northbound
Southbound Northbound
18 17
1 Incomplete Sidewalk 2 Wide Street and Crossing
24 713
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 300’ 600’
17 64’
38’ 26’
4TH ST
78’
LIVINGSTON ST
RAMSEY ST
OPPORTUNITY FOR
SIDEWALK COMPLETION
OPPORTUNITY TO REMOVE TURN
POCKET AND RESTRIPE THE STREET FOR
ANGLED PARKING ON BOTH SIDES
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING
LIVINGSTON ST
SAN
OPPORTUNITY TO EXPAND
SIDEWALK; COULD POTENTIALLY
IMPROVE INTERSECTION AND
OPPORTUNITY FOR REALIGN CROSSWALK
TRUNCATED DOMES
OPPORTUNITY FOR
TRUNCATED DOMES
MATCHLINE - SEE PAGE XX
1 2
3 25714
4th St & Hays
Continuing north on 4th St to Hays, the street is 68’
with a 100’ ROW. There is minimal striping on this
wide street segment, and the striping that exists
is confusing for all users due to the non uniformity
of it. Re-striping a turn lane and other elements
can help with traffic calming and help all users
understand where they should be in the street.
Sidewalk/Parkway Travel Lane Travel Lane Sidewalk/Parkway 16’ 28’ 12’ 28’ 16’
Turn Lane
68’ Road Width
100’ ROW
Southbound Northbound
18 17
1 Wide Street With No Crossings 2 Narrow Sidewalk 3 Inconsistant Striping 26 715
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 50’ 100’
0 300’ 600’
18 68’
100’
4TH ST
HAYS ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
OPPORTUNITY FOR
PARKWAY REVITILIZATION
LIVINGSTON ST
SAN
OPPORTUNITY TO ADD CURB
EXTENSIONS ACROSS HAYS ST
RESTRIPE ROADWAY TO CREATE A
CENTER TURN LANE THAT RUNS THE
LENGTH OF THE STREET TO CREATE
UNIFORMITY AND HELP WITH TRAFFIC
CALMING - SIGNIFICANT ROW FOR
OTHER ELEMENTS SUCH AS BIKE LANES
1 2
3 27716
3rd St & Livingston/Ramsey
On 3rd St between Livingston and Ramsey is another wide street with a width of 68’ and ROW of 80’. The east side of the street has no sidewalk and has vacant lots the whole length between 3rd St and the Boys and Girls Club. The west side of the street is a mix of commercial near Ramsey and residential with newly renovated houses on the southern half of the block. These houses however are for sale and have no sidewalk built in front. Restriping angled parking here could provide spaces for park and downtown users.
Existing Sections 3rd St
8’ 16’ 36’ 16’ 10’
Sidewalk/ Angled Parking Travel Lane Angled Parking
Parkway
Sidewal
68’ Road Width
88’ ROW
Sidewalk/
Parkway
Travel Lane
68’ 12’
80’ ROW
16’ 16’ 52’
Sidewalk/ Angled Parking Travel Lane
Parkway
Si
68’ Road Width
100’ ROW
68’ Road Width
Northbound Southbound
Northbound Southbound
Northbound Southbound
19 20
21 1 Inconsistant Sidewalks 2 Some Curb Extensions
28 717
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’ 0 300’ 600’
68’
80’
19 OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
OPPORTUNITY FOR CURB EXTENSION
OPPORTUNITY FOR CURB EXTENSION
OPPORTUNITY TO RESTRIPE THE STREET FOR
ANGLED PARKING ON BOTH SIDES - WILL
PROVIDE PARKING FOR NEW PARK
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
3RD ST
LIVINGSTON ST
RAMSEY ST
LIVINGSTON ST
SAN
OPPORTUNITY FOR
SIDEWALK COMPLETION
OPPORTUNITY TO ADD
CURB EXTENSION
OPPORTUNITY FOR
TRUNCATED DOMES
MATCHLINE - SEE PAGE XX
1 2
29718
3rd St & Hays
This segment of 3rd St is an example of angled parking on side streets that can be added to other streets to offset removal of some or all parking on Ramsey. Street width
is 68’ and the ROW is 88’ and 100’. Crosswalk and curb
extension improvements would help make this type of
street safer for non automobile users as drivers look for parking and may be distracted. Other issues relate to
sidewalk alignment with the east sidewalk being jogged
due to new parking lot paving causing sidewalk users to navigate into paved driveway to avoid existing utility box. 8’ 16’ 36’ 16’ 10’
Sidewalk/ Angled Parking Travel Lane Angled Parking
Parkway
Sidewalk
68’ Road Width
88’ ROW
80’ ROW
16’ 16’ 52’ 16’
Sidewalk/ Angled Parking Travel Lane
Parkway
Sidewalk
68’ Road Width
100’ ROW
68 Road Width
Northbound Southbound
Northbound Southbound
19 20
21 8’ 16’ 36’ 16’ 10’
Sidewalk/ Angled Parking Travel Lane Angled Parking
Parkway
Sidewalk
68’ Road Width
88’ ROW
Parkway
80’ ROW
16’ 16’ 52’ 16’
Sidewalk/ Angled Parking Travel Lane
Parkway
Sidewalk
68’ Road Width
100’ ROW
68’ Road Width
Northbound Southbound
Northbound Southbound
19 20
21 Angled Parking and 3
Inconsistent Sidewalk
No Markings Besides Old, Non Marked Pavement
Angled Parking
1 2
30 719
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 300’ 600’
20 21
36’
88’
68’
100’
68’
OPPORTUNITY TO ADD ANGLED
PARKING, OR RESTRIPE FOR PARALLEL
PARKING - INSTALL PARKING T’S OPPORTUNITY FOR CURB
EXTENSIONS ACROSS 3RD ST
3RD ST
HAYS ST
LIVINGSTON ST
SAN
OPPORTUNITY FOR HIGH
VISIBILITY CROSSWALKS AND
STOP BAR STRIPING, TYP.
Inconsistant Sidewalk
alignment. Utility in the way
1 2 3
31720
2nd St & Livingston/Ramsey
On 2nd St between Livingston and Ramsey the street is 48’ with a ROW of 60’. Angled parking is on the northbound
side while the southbound is a mix of green curb and
unmarked parallel spaces. Potential to convert green curb to normal spaces for more downtown parking.
Existing Sections 2nd St
5’ 16’ 32’ 5’
Sidewalk Angled Parking Travel Lane Sidewalk
48’ Road Width
60’ ROW
13’ 8’
Sidewalk/
Parkway
Sidewalk
65’ ROW
22 Northbound Southbound
Northbound Southbound
46’ Road Width
15’ 15’
Sidewalk/
Parkway
Sidewalk/
Parkway
60’ ROW
Northbound Southbound
30’ Road Width
24 23
1 Mixed Parking and Driveways 2 Narrow Sidewalks 3 Narrow Sidewalk, Old Curb ramp 32 721
0 50’ 100’
0 300’ 600’
22 48’
28’50’
60’
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING
OPPORTUNITY TO REALIGN
CROSSWALK OR ADD CURB EXTENSION
OPPORTUNITY FOR
TRUNCATED DOMES
2ND ST
LIVINGSTON ST
SAN
LIVINGSTON ST
RAMSEY ST
EXISTING GREEN CURB CONVERTS
TO REGULAR CURB AND PARKING
T’S FOR PARALLEL PARKING
CLEANERS LOCATED HERE - 15
MINUTE PARKING DUE TO ON/OFF
STREET PARKING
1 2 3
MATCHLINE - SEE PAGE XX
PEDESTRIAN INJURY
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
33722
2nd St & Hays
The segment of 2nd St at Hays transitions from a 46’ street to 30’ with 65’ to 60’ ROW respectively as it moves north into the residential and elementary school area. There is parallel parking on this segment of 2nd St and could be turned into red curb on the northern end as the street
width is 30’ and near a school.
48’ Road Width
60’ ROW
13’ 8’
Sidewalk/
Parkway
Sidewal
65’ ROW
22 Northbound Southbound
46’ Road Width
15’ 15’
Sidewalk/
Parkway
Sidewalk/
Parkway
60’ ROW
Northbound Southbound
30’ Road Width
24 23
60’ ROW
13’ 8’
Sidewalk/
Parkway
Sidewalk
65’ ROW
22 Northbound Southbound
46’ Road Width
15’ 15’
Sidewalk/
Parkway
Sidewalk/
Parkway
60’ ROW
Northbound Southbound
30’ Road Width
24 23
Narrow Street With
Unmarked Parallel Parking
Narrow Street With
Unmarked Parallel Parking
1 2
34 723
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 300’ 600’
23 24
30’
60’
46’
65’
HAYS ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
POTENTIAL CROSSING OPPORTUNITY
ACROSS HAYES - PART OF TRAFFIC
CALMING CONCEPT
PLANTING OPPORTUNITIES
IN PARKWAY
EXISTING CATCH BASINS
PROPOSED RED CURB
INADEQUATE CURB RAMP
OPPORTUNITY FOR
TRUNCATED DOMES
2ND ST
LIVINGSTON ST
SAN
1 2
35724
1st St & Livingston/Ramsey
The segment of 1st St between Livingston and Ramsey
looks and functions more as a parking lot than a street with either side having perpendicular parking and curbed driveway ramps in and out of the street onto Ramsey and Livingston. The street width is 68’ with a 96’ ROW divided by a dashed single line. The planters at the end with trees make sight-lines for turning onto adjacent streets difficult and are not standard in their location on what would be standard curb extension area. Opportunity for 1st to be a shared street that could allow some parking might make
this central street of downtown more of desirable place to be and host events in town.
Existing Sections 1st St
Sidewalk/Parkway Perpendicular Parking Perpendicular Parking Sidewalk/Parkway 14’ 18’ 32’ 18’ 14’
Travel Lane
68’ Road Width
96’ ROW
Sidewalk Angled Parking Angled Parking Sidewalk/Parkway 6’ 18’ 32’ 18’ 16’
Travel Lane
68’ Road Width
90’ ROW
Southbound Northbound
Southbound Northbound
25 26
Driveway Entrance With Planters Planters Block Sightline to Perpendicular Parking
1 2 3 Angled Parking
36 725
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 300’ 600’
25 32’68’
96’
LIVINGSTON ST
SAN
LIVINGSTON ST
RAMSEY ST
1ST ST
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
OPPORTUNITY FOR MURALIZATION
TO REDO AND MAINTAIN
PROVIDE SIGHTLINES FOR
VEHICLES TO PROCEED FORWARD
1ST ST & LIVINGSTON ST INTERSECTION
TREATED AS DRIVEWAY
ONLY SIDE STREET WITH
CENTER LINE STRIPING
OVERALL QUESTION: IS 1ST ST TREATED
LIKE A STREET OR A PARKING LOT?
HOW IS IT REGULATED - TREATED LIKE
A ROADWAY SEGMENT
1 2 3
MATCHLINE - SEE PAGE XX
37726
1st St & Hays
To the north, the parking on 1st St is angled along the same street width of 68’ and reduced ROW of 90’ from
96’ south of Ramsey. The sidewalk on the southbound side is 6’ wide which is narrow for users accessing cars and downtown, especially having to navigate around light
posts. Narrowing the 32’ travel lane could help with traffic calming and allow for more sidewalk space in addition to curb extensions.
68’ Road Width
96’ ROW
Sidewalk Angled Parking Angled Parking Sidewalk/Parkway 6’ 18’ 32’ 18’ 16’
Travel Lane
68’ Road Width
90’ ROW
Southbound Northbound
25 26
Opportunity for Trees and
Curb Extension
Opportunity for Trees and
Curb Extensions
1 2
38 727
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 300’ 600’
26 68’68’
90’
100’
LIVINGSTON ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS AND STOP BAR STRIPING, TYP.
INADEQUATE CURB RAMP
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR CURB EXTENSIONS
PROPOSED 4 WAY STOP - SIDE STREET
HAS PRIORITY WHILE THROUGH STREET
HAS NO STOP FOR PEDESTRIANS
HAYS ST
1ST ST
1 2
MATCHLINE - SEE PAGE XX
OPPORTUNITY FOR TREES
39728
40 SECTION DIAGRAMS - HAYS STREET
Hays St runs parallel to Ramsey St north of it. The segment of Hays Street in the study area is between 4th St and Martin St. Hays is where the downtown area begins to blend in with neighboring residential and community focused sites like schools, libraries, and places of worship. 729
41 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
730
Hays & 4th St/3rd St
Hays between 4th St and 3rd St is a 38’ street with 50’ ROW and has no markings but allows for parallel parking. Re-striping the street with one side parking removed and adding crosswalks and stopping bars could provide space for active transportation users and safe crossings.
Existing Sections Hays St
Existing Sections Hays St
8’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
6’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
38’ Road Width
52’ ROW
Eastbound Westbound
Eastbound Westbound
5’
Sidewalk
7’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
Eastbound Westbound
27 28
29 27A
Obstructed Sidewalk Opportunity for High
Visibility Crossings
1 2
42 731
27 0 50’ 100’
38’
19’ 19’
50’
HAYS ST
4TH ST
3RD ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY TO ADD CURB
EXTENSIONS ACROSS HAYS ST
EXISTING ROW ALLOWS FOR PARKING
ON BOTH SIDES AND TRAVEL LANE IN
EACH DIRECTION - LIMITED PARKING
USE COULD PROVIDE ADDITIONAL
SPACE FOR AT FACILITY IF REMOVED
FROM ONE SIDE
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR CURB
EXTENSIONS ACROSS 3RD ST
LIVINGSTON ST
SAN
MATCHLINE - SEE PAGE XX
12 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
43732
Hays & 2nd St
Hays at 2nd St is the same 38’ street with 50’ ROW and limited striping.
The intersection of Hays and 2nd St should be considered in the larger network planning for access to the nearby grade schools.
Existing Sections Hays St
Existing Sections Hays St
8’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
6’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
38’ Road Width
52’ ROW
Eastbound Westbound
Eastbound Westbound
5’
Sidewalk
7’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
Eastbound Westbound
27 28
29 27A
Obstructed Narrow Sidewalk Opportunity for High Visibility 3 Obstructed Narrow Sidewalk Crossing & Curb Extensions
1 2
44 733
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
50’
27A
0 50’ 100’
38’
HAYS ST
2ND ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
POTENTIAL CROSSING OPPORTUNITY
ACROSS HAYES - PART OF TRAFFIC
CALMING CONCEPT
OPPORTUNITY FOR
TRUNCATED DOMES
LIVINGSTON ST
SAN
INADEQUATE CURB RAMP
MATCHLINE - SEE PAGE XX
C
S
G
123
45734
Hays & 1st St/San Gorgonio
Hays between 1st St and San Gorgonio is the same 38’ street with a slightly wider 52’ ROW and limited striping. The intersections of Hays and 1st St and San Gorgonio should be considered in the larger network planning for access to the nearby grade schools. High visibility crosswalks and curb extensions can make intersections more pedestrian and active transportation focused.
Existing Sections Hays St
8’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
50O
38’ Road Width
52’ ROW
Eastbound Westbound
5’
Sidewalk
7’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
Eastbound Westbound
28 29
27A
Obstructed Narrow Sidewalk 3
Opportunity for Curb Extensions
Opportunity for Curb Extensions
and High Visibility Crossings
Opportunity for Alley
Connection to Ramsey
1 2
46 735
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
28 0 50’ 100’
38’
52’
HAYS ST
1ST ST
SAN GORGONIO AVE
OPPORTUNITY FOR
HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR CURB EXTENSIONS
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR
TRUNCATED DOMES
OPPORTUNITY FOR
TRUNCATED DOMES
LIVINGSTON ST
SAN
INADEQUATE CURB RAMP
MATCHLINE - SEE PAGE XX
123
47736
Hays & Murray
The eastern edge of Hays ends at the intersection with Murray. The segment of Hays between Murray and Alessandro is walled off for the police station vehicle parking and will most likely not be changed. Improvements to the intersection and Hays include a high visibility crosswalk of Murray and wider sidewalks.
Narrow Sidewalks and
Green Curbs
Opportunity for High Visibility 2
Crosswalk
1 52’ ROW
5’
Sidewalk
7’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
Eastbound Westbound
28 29
48 737
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
29 0 50’ 100’
1 2 HAYS ST
50’
38’
MURRAY ST
OPPORTUNITY FOR
HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR
TRUNCATED DOMES
SAN
MATCHLINE - SEE PAGE XX
49738
Driveway Eintrance and Signage 3
For Public Employee Parking
1 2 Parking Lot Condition Driveway Entrance
Existing Sections Hays St
8’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
6’
Sidewalk
6’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
38’ Road Width
52’ ROW
Eastbound Westbound
Eastbound Westbound
5’
Sidewalk
7’
Sidewalk
19’
Travel Lane
19’
Travel Lane
38’ Road Width
50’ ROW
Eastbound Westbound
27 28
29 27A
Travel Lane
18’
Travel Lane Perpendicular Parking
24’ Road Width
42’ ROW
Eastbound Westbound
30 Hays & Murray
The segment of Hays between Alessandro and Martin is another street similar to south 1st St that has been conditioned as a parking lot with driveway type entrances. With the closure of Hays by the police station, this additional parking lot of Hays leads to a disruption of the grid. The 18 parking spaces along the south side of Hays are assumed to be part of the parking lot marked for Riverside County Employee and Public parking. Reallocating these spaces elsewhere could easily be done via signage along one of the adjacent half blocks of Martin or Alessandro street parking. If these 18 spaces are only used by the public, they could also be eliminated entirely, as the adjacent streets have ample parking.
Reclaiming this street could provide space to use as a shared-slow street that the city could use for events or host food trucks serving city employees at the court house, post office, and police station among others.
50 739
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
30 0 50’ 100’
OVERALL QUESTION: IS HAYS ST
TREATED LIKE A STREET OR A PARKING
LOT? HOW IS IT REGULATED - TREATED
LIKE A ROADWAY SEGMENT
HAYS ST & ALESSANDRO ST
INTERSECTION TREATED AS DRIVEWAY
HAYS ST & MARTIN ST INTERSECTION
TREATED AS DRIVEWAY
1 2
3 42’
HAYS ST
SAN
ALESSANDRO ST
MARTIN ST
MATCHLINE - SEE PAGE XX
51740
52 SECTION DIAGRAMS - LIVINGSTON STREET
Livingston runs parallel to Ramsey and is south of it transitioning from South 6th on the west end to South Livingston on the west. This western edge is the next street over from Hargrave Street. Livingston is bisected by North San Gorgonio Ave and acts as the “back of house” street for Ramsey.
Potential for parking exists all along Livingston and this street could play an important role in creating a more pedestrian focused downtown main street on Ramsey.
741
53 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
742
Livingston & 6th St
Livingston connects at the western end to the southern end of 6th St directly adjacent to the northern side of interstate 10. The street width of Livingston is 26’ with a ROW of 42’ except for the few hundred feet connecting to 6th St without tree lawn. Widening the sidewalk will provide more access for pedestrians, especially if more parking is allocated to Livingston to offset removal elsewhere.
Existing Sections Livingston St
5’
Sidewalk
13’
Travel Lane
13’
Travel Lane
14’
Travel Lane
18’
Travel Lane
26’ Road Width
32’ ROW
11’
Sidewa
32’ Road Width
42’ ROW
Eastbound Westbound
Eastbound Westbound
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
31 32
33 1 Obstructed Narrow Sidewalk
54 743
0 50’ 100’
26’
13’ 13’
32’
32’
18’ 14’
42’
31 LIVINGSTON ST
6TH ST
LIVINGSTON ST
SAN G
EXISTING ROW ALLOWS FOR LARGE
VEHICLE PARKING AND LANES OR TRUCK
BYPASS IF NO PARKING IS ON EITHER SIDE
MATCHLINE - SEE PAGE XX
1 0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
55744
Livingston & 4th St
This section of Livingston is the same 42’ ROW and has opportunity to have high visibility crosswalk at 4th St. Other opportunity for more trees in the parkway exists on the northeast corner. 14’
Travel Lane
18’
Travel Lane
26’ Road Width
32’ ROW
11’
Sidewalk
32’ Road Width
42’ ROW
Eastbound Westbound
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
31 32
33 1 Narrow Sidewalk
Parkway
56 745
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
32’
42’
32 18’ 14’
LIVINGSTON ST
4TH ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR
SIDEWALK COMPLETION
OPPORTUNITY FOR
TRUNCATED DOMES
LIVINGSTON ST
SAN
MATCHLINE - SEE PAGE XX
1 57746
Livingston & 3rd St/2nd St
In this section a driver heading east hit a 31 year old female pedestrian headed east. High visibility crosswalks along Livingston for these cross streets would make safer conditions for those walking to their cars, or pedestrians accessing this part of the study area. This section also shows how properties could be accessed only by Livingston versus both Livingston and connecting to Ramsey via streets like 2nd St shown here. 14’
Travel Lane
18’
Travel Lane
26’ Road Width
32’ ROW
11’
Sidewalk
32’ Road Width
42’ ROW
Eastbound Westbound
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
31 32
33 1 Parking Lot Access From Livingston
58 747
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
42’
32 0 50’ 100’
32’
18’ 14’
LIVINGSTON ST
3RD ST
2ND ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
EXISTING CURB CUTS FOR PARKING LOTS
SHOW THAT PARKING CAN BE ACCESSED
FROM LIVINGSTON IF WE WANTED TO
HAVE NO ACCESS FROM RAMSEY
PEDESTRIAN INJURY
LIVINGSTON ST
SAN G
OPPORTUNITY FOR
SIDEWALK COMPLETION
MATCHLINE - SEE PAGE XX
MATCHLINE - SEE PAGE XX
1 59748
Livingston & 1st St
The intersection of 1st St and Livingston is more like a driveway to parking lot than intersection of streets. Planters block sight lines to Livingston. Determining how many spaces are used by which business on 1st St and adjacent lots will help determine how this street should exist as it is in the heart of the downtown and could potentially serve non automobile users better as a shared public space rather than parking lot.
14’
Travel Lane
18’
Travel Lane
26’ Road Width
32’ ROW
11’
Sidewalk
32’ Road Width
42’ ROW
Eastbound Westbound
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
31 32
33 1 Obstructed Site Lines
60 749
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
32 0 50’ 100’
32’
42’
18’ 14’
LIVINGSTON ST
1ST ST
LIVINGSTON ST
SAN
1ST ST & LIVINGSTON ST INTERSECTION
TREATED AS DRIVEWAY
MATCHLINE - SEE PAGE XX
1 61750
Livingston & San Gorgonio
The intersection of Livingston and San Gorgonio is a potential gateway to the downtown as it is the first place users pass through when traveling on San Gorgonio across the I-10 bridge. Curb extensions would make crossing here safer along with high visibility crosswalks. Wider sidewalks and active transportation lanes on the San Gorgonio bridge will make traveling for non automobile users safer, especially those traveling to the high school south of downtown along this street.
14’
Travel Lane
18’
Travel Lane
26’ Road Width
32’ ROW
11’
Sidewalk
32’ Road Width
42’ ROW
Eastbound Westbound
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
31 32
33 Opportunity to Install ADA Compliant
Curb Ramps and High Visibility Crossings
1 62 751
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
32 0 50’ 100’
0 400’ 800’ 32’
42’
32’
18’ 14’
LIVINGSTON ST
SAN GORGONIO AVE
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
CURB RAMPS ARE NOT
ADA COMPLIANT
1 63752
Livingston & Alessandro
The segment of Alessandro here is between two vacant properties.
Livingston continues from before with a 32’ road and 42’ ROW with only sidewalk on one side. There are metal posts with red diagonal signs in the roadway at the ends of the street preventing traffic from passing through, but hasn’t prevented people from using the properties for event staging/parking. It is unclear what the future of these properties is but could become a hotel.
14’
Travel Lane
18’
Travel Lane
26’ Road Width
32’ ROW
11’
Sidewalk
32’ Road Width
42’ ROW
Eastbound Westbound
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
31 32
33 1 Vacant Lots
64 753
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’ 0 400’ 800’
32’
42’
18’ 14’
32 LIVINGSTON ST
ALESSANDRO ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
CURB RAMPS ARE NOT
ADA COMPLIANT
MATCHLINE
SEE PAGE XX
1 65754
Livingston & Martin
Martin is the eastern boundary of the study area and the edge of the downtown adjacent to the court house. The intersection of Livingston and Martin could soon have more traffic as parking could be added to Livingston and diverted from other streets. Improvements at this intersection include completing the sidewalk along the eastern corner of Livingston and Martin as well as adding a crosswalk.
32 Road Width
42’ ROW
14’
Travel Lane
18’
Travel Lane
32’ Road Width
32’ ROW
Eastbound Westbound
32 33
Incomplete Sidewalk and Curb
Ramps Not ADA Compliant
1 66 755
0 300’ 600’
RAMSEY ST
HAYS ST
LIVINGSTON ST
8TH ST
6TH ST
4TH ST
3RD ST
2ND ST
1ST ST
SAN GORGONIO AVE
ALESSANDRO ST
MARTIN ST
0 50’ 100’
0 400’ 800’
32’
33 18’ 14’
LIVINGSTON ST
MARTIN ST
OPPORTUNITY FOR HIGH VISIBILITY
CROSSWALKS, TYP.
INCOMPLETE SIDEWALK
CURB RAMPS ARE NOT
ADA COMPLIANT
MATCHLINE
SEE PAGE XX
67756
COMMUNITY ENGAGEMENT
Engagement with members of the community is a vital part of the design process and helped the project team guide decisions for how best to implement the desires of the community. Throughout the project there were several engagment events both gain initial insights and later to get feedback on several design concept themes. 68 757
69758
Round 1 - Initial Engagement
The initial engagement took place on October 27th, 2022 at a number of places throughout the day. These included:
Downtown Ad Hoc Committee, Banning High School, Nicolet Middle School, Central Elementary School, Community
Meeting at City Hall. At these different locations the poject team gave presentations and heard valuable feedback
from community members. Collecting feedback happened
with the aid of display boards with information on topics including: Urban Design, Development Experience, and
Street Safety and Transportation.
Community Engagement
70 759
Slow
Streets 1
(tan road)
programm
ed alleys
(yellow
sculpture
pic)
bike
parking
Active
street
terrace (pic
with
barrels)
shade and
comfort
programm
ed alleys
(dairy block
pic)
green
stormwate
r
manageme
nt
Outdoor
Gathering
Space
(beer
garden pic)
fix it
station
Slow
Streets 2
(theater
pic)
wayfinding
Active
street
terrace
(green
umbrella
pic)
Sum of Yes 6 6 6 5 5 5 5 5 3 1 1 1
Sum of Maybe 1 1
Sum of No 1 1
6 6 6
5 5 5 5 5
3 1 1 1 1 1 1 1
0 1
2 3
4 5
6 7
Axis Title
Urban Design Options
Urban Design
Sum of Yes
Sum of Maybe
Sum of No
raised
osswalk curb extensions pedestrianscale lighting
enhanced bus
shelters with
shade
raised
intersection
flush curb
Separated Bike
lanes (classIV
planters paint)
Separated Bike
lanes (classIV
Green paint)
enhanced ped
crossing
midblock ped
reffuge
real time
transit info chicane
4 4 4 3 3 2 2 2 2 2 1
2 1 2
4 4
3 3
2 2 2 2 2
1 2
1 2
1 1 1 1 1 1 1 1
Street Safety
Sum of Yes
Sum of Maybe
Sum of No
Urban Design
The community showed interest in slow streets, programmed alleys, bike parking as well as active street terrace, green stormwater management, shade, and outdoor gathering. There were a few dislikes marked on the board, including active street terrace with elements like barrels and furniture, as well as outdoor gathering space which might relate to the concern of unhoused people downtown voiced by some.
71760
street
festivals
public park
and
playground
arts and
music events
farmers/flea
market
outdoor
movies
night
attractions(st
agecoach
horse parade)
cultural/seaso
nal events
and
attractions(
native
dancing)
mixed use
(urban
downtown pic
3)
mixed use
(spanish style
brick corner
pic 2)
cultural/seaso
nal events
and
attractions(st
agecoach
horse parade)
mixed use
(spanish style
white pic 1)
mixed use
(brown/tan
apts pic 4)
Sum of Yes 8 8 8 7 6 6 5 4 4 3 1
Sum of Maybe 1 2 1 1
Sum of No 1 1
8 8 8
7 6 6
5 4 4
3 1 1
2 1 1 1 1
0 1
2 3
4 5
6 7
8 9
Count
Development and Experience Options
Development and Experience
Sum of Yes
Sum of Maybe
Sum of No
pedestrian
enhanced busraisedSeparated BikeSeparated Bike
enhanced pedmidblock pedreal time
4 4
3 3
2 2 2 2 2
1 2
1 2
1 1 1 1 1 1 1 1
Street Safety
Sum of Yes
Sum of Maybe
Sum of No
Development and Experience
Participants were excited about street festivals, public parks and open space, farmer/flea markets, outdoor movies and night attractions. Initial findings also showed interest in mixed use development to offer spaces for residential and live-work studios downtown.
72 761
speed humps raised
crosswalk curb extensions pedestrian
scale lighting
enhanced bus
shelters with
shade
raised
intersection
flush curb
Separated Bike
lanes (classIV
planters paint)
Separated Bike
lanes (classIV
Green paint)
enhanced ped
crossing
midblock ped
reffuge
real time
transit info chicane
Sum of Yes 6 4 4 4 3 3 2 2 2 2 2 1
Sum of Maybe 2 1 2
Sum of No 1 1 1 1 1 1 1 1 1
6 4 4 4
3 3
2 2 2 2 2
1 2
1 2
1 1 1 1 1 1 1 1 1
0 1
2 3
4 5
6 7
Count
Street Safety Options
Street Safety
Sum of Yes
Sum of Maybe
Sum of No
raisedpedestrian
enhanced busraisedSeparated BikeSeparated Bike
enhanced pedmidblock pedreal time
6 4 4 4
3 3
2 2 2 2 2
1 2
1 2
1 1 1 1 1 1 1 1 1
Street Safety
Sum of Yes
Sum of Maybe
Sum of No
Street Safety and Transportation
Street improvements focusing on pedestrian and cyclist safety were supported with speed and making space for all users being top priority. All ages shared this sentiment but even more so from students who mentioned the desire for a safer route from schools to Downtown to meet up after school.
73762
Initial Experience Survey
Throughout the duration of the project in addition in person engagement there were two online surveys which allowed for the community to provide input on the project. The first survey had had 250 complete responses and asked general questions about their use of downtowna amenities they might like to see in Downtown Banning.
TIME SPENT DOWNTOWN?
77% of people visit downtown because they live here and time spent downtown was 51% for less than one hour, 13% for a few hours, 5% for most of the day, and 30% for I do not visit downtown.
HOW OFTEN DO YOU WALK, BIKE, OR TAKE TRANSIT DOWNTOWN?
52% of respondents never use non vehicular modes downtown. 20% a few times per month, 12% less than monthly, 12% a few times a week and 2.5% everyday.
WHAT WOULD MAKE YOU FEEL MORE COMFORTABLE OR SAFER
WALKING, BIKING, ROLLING, OR TAKING TRANSIT DOWNTOWN? PLEASE CHOSE TOP 3.
Respondents so far of the open survey ranked safer crossing infrastructure (crosswalks, pedestrian signals, etc.), and pedestrian lighting as most desired to make non auto mobility more comfortable. Wider sidewalks, seating, shade and bicycle parking were also desired to a lesser degree. Less cars on the street, bus stops with more amenities, and more affordable transit options ranked lowest. Some write-ins for the Other category included: “More businesses that were family friendly, everything is catered to low income”, Businesses like food restaurants, clothing stores, modernizing downtown area like Fullerton or Brea” “Less transients” “Stores to Shop” and “diagonal parking, like on State Street in Redlands to slow down motorists and make Ramsey more ‘pedestrian friendly’”.
WHICH OF THE FOLLOWING STREETSCAPE AMENITIES WOULD YOU LIKE TO SEE IN DOWNTOWN BANING? PLEASE CHOSE TOP 3.
Respondents so far of the open survey want lighting, outdoor dining, green landscaping and shade as their most desired elements. Seating, plaza/meeting space, public art and city monument/gateway are moderately desired, while pocket parks, hydration stations, wayfinding, pedestrian-only alleys are the least ranked.
GENERALLY, WOULD YOU BE WILLING TO LOSE PARKING SPACE OPTIONS
IN DOWNTOWN BANNING IF IT MEANT WALKING AND BIKING FACILITIES WERE IMPROVED?
53% responded yes, 41% no and 5% other including comment about building a parking structure.
Age of Respondents
Race or Ethnicity of Respondents
74 763
Concept Themes Outreach and Survey
The second engagement day took place on May 17th, 2023. The day included presentation at The Chamber of Commerce Sunrise Breakfast, walk audit with Downtown business owners, and two workshop sessions for business owners followed by full community. The three concepts presented were: The Spark, Park & Play, and Gradient, which illustrated various design and placemaking treatments. Results from the workshops (below) showed that the community preferred The Spark concept with Park & Play and Gradient vying for the 2nd favorite in different instances. See appendix for additional details.
The second survey presented the design concept themes of The Spark, Park & Play and Gradient. The survey had 127 complete responses. Participants could rank their choices for each using the photo simulation vignettes to give a sense of what that theme could look like. Out of the seven categories all categories besides look & feel had The Spark as the first choice with almost 50% or over 50% of respondants chosing it.
Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Main Street Survey Results
Which Main Street Concept Do You Like Most?
Rank 1-3, most to least.
Spark Park & Play Gradient
Banning, CA | July 6th, 2023
Which Alley Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 23437bf358c94e2b-b125-ab293252714d, Which Shared Street Concept Do You Like Most? Rank 13, most to least.
Banning, CA | July 6th, 2023
Which Alley Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 23437bf358c94e2b-b125-ab293252714d, Which Shared Street Concept Do You Like Most? Rank 13, most to least.
Alleys Survey Results
Spark Park & Play Gradient
Which Alley Concept Do You Like Most?
Rank 1-3, most to least.
75764
Banning, CA | July 6th, 2023
Which Alley Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 23437bf358c94e2b-b125-ab293252714d, Which Shared Street Concept Do You Like Most? Rank 13, most to least.
Banning, CA | July 6th, 2023
Which Alley Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 23437bf358c94e2b-b125-ab293252714d, Which Shared Street Concept Do You Like Most? Rank 13, most to least.
Shared 1st Street Survey Results
Which Shared Street Concept Do You Like Most
Rank 1-3, most to least.
Spark Park & Play Gradient
Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: bb2a138f-9db7432196621ca02cb20904, Which Main Street Concept Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 10eccc9c-e73c-44b58576-fb9cc7c449c6, Which Streetscape and Mobility Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: bb2a138f-9db7432196621ca02cb20904, Look & Feel - Streetscape and Mobility Survey Results
Spark Park & Play Gradient
Which Streetscape and Mobility Elements Do You Like Most? Rank 1-3, most to least.
76 765
Look & Feel - Purblic Realm/Open Space Survey Results Look & Feel - Land Use Elements Survey Results Which Public Realm/Open Space & Placemaking Elements Do You Like Most? Rank 13 most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: f3c9382753664de798d06258feb983a2, Which Land Use Elements Do You Like Most? Rank 13, most to least.
Which Public Realm/Open Space & Placemaking Elements Do You Like Most? Rank 13 most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: f3c9382753664de798d06258feb983a2, Which Land Use Elements Do You Like Most? Rank 13, most to least.
Which Public Realm/Open Space & Placemaking Elements
Do You Like Most? Rank 1-3, most to least.
Spark Park & Play Gradient
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: f3c9382753664de798d06258feb983a2, Which Land Use Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 7075bd14-c0424a0c-a09b-a740ba28dc68, Created with Zencity data and analysis
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: f3c9382753664de798d06258feb983a2, Which Land Use Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: 7075bd14-c0424a0c-a09b-a740ba28dc68, Which Land Use Elements Do You Like Most?
Rank 1-3, most to least.
Spark Park & Play Gradient
77766
Which Design Language and Detail Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: c4869b12-b2d94543-bde66f174b11b81d, what is your age?
Which Design Language and Detail Elements Do You Like Most? Rank 13, most to least.
Organization: engagebanning, Engagement: 766885b15ee44635-b3968dbe7cb4483e, Questions: c4869b12-b2d94543-bde66f174b11b81d, what is your age?
Which Design Language and Detail Elements Do You Like Most? Rank 1-3, most to least.
Spark Park & Play Gradient
Look & Feel - Design Language and detail Elements Survey Results 78 767
This Page is intentionally left blank
79768
Open Ended Concept Survey Comments
Housing Unhoused Landscape History/Feeling Transit Reference Business Gateway Bikes Pedestrians Parking/Traffic Do you have any other thoughts or comments about the
project and concepts?
California, Banning, Desert, or any other historical information posted. Let me learn something.
Jun 30, 2023
Thank you for caring enough about Banning to work toward having a vibrant, healthy downtown! Jun 28, 2023
Concern that survey may be skewed to Spark because the Spark option is always listed first on the survey questions.
Jun 27, 2023
Something that would appeal to people that drive by on the freeway and make them want to stop and take a load off.
Jun 26, 2023
Clean up Ramsey street. Get rid of all the burned down hotels. We have a prime location. Our city is right of a busy highway.
When there’s traffic we have thousands of people using our streets. So many potential customers. Let’s entice them in. We can have that small town charm. We are a small town with no charm.
Jun 25, 2023
Homelessness needs to be addressed for the down town area to be developed into anything. Looking forward to seeing positive change in the down town area of banning it’s long overdue.
Jun 25, 2023
Love all the effort!
Jun 23, 2023
We should implement drought tolerant landscapes and large shaded trees that require minimal water use. I love the ideas of more natural themes and think it would be beneficial to have during hot, sunny days where lots of shade could help.
Jun 23, 2023
Lower tax for business. Add more restaurants. Relocate the homeless to the end of banning by cabazon away from the freeway.
Jun 22, 2023
Would love to have dining options that are not chain restaurants. Maybe indoor/outdoor concept.
Jun 22, 2023
Every city should keep an appreciation of their history but that doesn’t mean the whole city needs to keep the history throughout. Banning is growing, from people all over and is becoming very diverse in culture and age, which should be kept in mind when designing. Take a look at Victoria Gardens, Haven City Market, and Citrus Plaza.
Jun 22, 2023
Creative office space ,Virtual office space , open space, colorful buildings, Hotel not Motel , sculpture art, more inviting for small businesses, inviting atmosphere , the designs are very nice colorful and more inviting .no dollar stores, no liquor stores, no more taco places, can we get a fish dinner restaurant. No more fast food, can we get a olive garden, TGIF Fridays, BJs or other better restaurants
Jun 22, 2023
We need a new “Orange Hill Mining Co.” up the hillside for our view and a nice dinner, for one thing. This is the new North Tustin, Beverly Hills, Orange Hill, of Banning, the last and highest spot before Palm Springs and all that is coming. Do NOT ruin it with industrial! Places to show off horses, stagecoach - high end like Norco’s Horse Town USA. Last chance to not mess up the Pass. Mix Corona Del Mar / Laguna Beach / Norco and PS into one right here. Like Sun Lakes CC, but on the outside! 1 level high end hotels, but do not ruin views. Do that down the mountain. Thank you.
Jun 22, 2023
Follow Beaumont’s ideas. They have allowed so many new shopping centers and its always full. Bring some of that economy to Banning. Make Banning new. It’s old and run down. We live here but go out of Banning to shop and play.
Jun 22, 2023
Stormwater management makes sense and provides a green space.
Jun 22, 2023
We need more things to do in Banning. I am very tired of having to go all the way to other cities like Moreno Valley and Palm Springs to be able to enjoy going out with family. Banning has absolutely nothing but homes, horrible choices for food, no shops, and virtually no entertainment.
Jun 21, 2023
More department/grocery stores will bring more money and more people with money. Beaumont is one of the fastest growing cities in California and we are it’s sister city, which means we are able to get the same growth if there was something to draw families in. Lack of stores and entertainment will keep a poor town, a poor town. In order to grow banning. Banning needs to grow itself.
Jun 21, 2023
All of this would be great if the transient wouldn’t destroy the property. People are afraid of going into certain areas of Banning because of the homeless.
Jun 17, 2023
Safer, cleaner downtown, Cameras, police enforcement & presence Jun 16, 2023
Keep the history, but with California natural landscaping and storm water infrastructure Jun 14, 2023
City should bring in a grocery store/ box brand into the downtown area. Promote shopping locally with a new concept that will benefit residents. The down town area could be brightened with restaurants/ bars that have a down town Redlands or old town Temecula feel.
Jun 14, 2023
80 769
Housing Unhoused Landscape History/Feeling Transit Reference Business Gateway Bikes Pedestrians Parking/Traffic Buildings no more than 2 stories. Attract the people we want to see. More upscale dining, shops and activities. Skating rink, Ballroom dancing.
Jun 8, 2023
Maybe work on the drug and homeless problem in the area first. you want to spend all our money on something nice for them to ruin it. Get rid of the Grey hound stop releasing the criminals from jail into the city. It’s terrible when I can even get gas at 22nd with out getting hit up for change
Jun 7, 2023
Instead of focusing on an area that only city employees are pertinent too, why not focus on other areas that really need improvement. The downtown area is not in need of an uplift at the moment.
Jun 2, 2023
Landscaping should be low maintenance and drought tolerant. Perhaps more hardscapes (e.g. DG , colored gravel). Tree’s should be away from building. I’d like to see lights strung from across Ramsey from buildings like historic pictures show. The addition of a large tree to be used for a Christmas tree lighting would be well received. One comment on the concept; the vibrant colors used with the gray contrast makes it very difficult to visualize what it would actually look like in real life.
Jun 1, 2023
I believe park and play, then spark, then gradient would be the wisest. I believe it would bring more life to the area and give the feel of a vibrant community.
Jun 1, 2023
In some instances, I preferred elements from 2 different ones and not all the details in each individual design May 29, 2023
Right now it is a waist of money, that could be used more effectively. Also the city counsel needs to learn to listen to those who are working for the good of the citizens . Investigate the process and correct their mistakes before making decisions.
Sherri has worked so hard and no one on counsel listens or considers checking on the problems brought up by her. Like they are only there for themselves or intimidated by the city manager, or fattening their pockets by city manager for some reason.
May 28, 2023
I want to suggest something unique, historic like Redlands. Also, some fun activities as well, such as monthly fair or event.
Something you can hangout and never get board
May 26, 2023
1, 3,2 most to least concept. You may want to consider closing Ramsey from 8th street to Hargrave. The Ramsey can only hold single lane in this area. Would work better to route traffic around to Lincoln where streets are wider and able to handle heavier traffic. Look closer at design review for this area. Encourage a for historic outward appearance instead of a mixture of back street garage vs plain stucco exterior. You don’t get a good vibe looking at uninteresting stucco.
May 26, 2023
Provide enough waste containers to keep the area clean. Provide enough lights to keep the area safe.
May 26, 2023
Don’t screw up Banning’s small town Horse Town Charm. Take care of the major issues affecting this town, burn out businesses, homeless and drugs. When those issues are quelled and continually enforced, then you can start making over the downtown. Until then, no matter what you do, it’s like putting lipstick on a pig.
May 26, 2023
Need to clean up transients for this to be effective.
May 26, 2023
The only thing that will draw people to downtown, is to have something there that they can’t get elsewhere- ex: Costco, Target, Sam’s Club, Trader Joe’s, Whole Foods, Olive Garden, Outback Steakhouse, Red Lobster. Places that people need or want to return to, over and over. Cute streets and bike racks aren’t going to bring people, there has to be a major destination spot to draw them in, and then nice surroundings will keep them coming back.
May 26, 2023
I would love to see more activities and areas for the kids teenagers and of course area where family can get together besides a park arcade will be something fun for the kids
May 25, 2023
It would like to see more bright lighting in the area as well in the neighborhoods close to it. It would be nice to have a small playground for the kids while the parent have a sitting area to watch and relax May 25, 2023
Some other ideas: a) https://i2.wp.com/lenjourneys.com/wp-content/uploads/2019/02/seoul-25.jpg?ssl=1 b) https://www. realtor.com/wp-content/uploads/2016/03/iStock_000054265102_Medium.jpg c) https://hips.hearstapps.com/hmg-prod/ images/broken-shaker-at-freehand-hotel-1659475341.jpg
May 25, 2023
Get the homeless off the street so they don’t mess it up more May 25, 2023
I like 1-3-2 in all questions but unable to change order May 25, 2023
81770
Spark
• Connect to Dorothy Cultural Center on 1st Street, Respect all historical resources.
• Church on 1st brings many people
• Oakland has opportunities for (unsure, heal atl?) always could be good.
• San Gorgonio: Hays to Williams, is it an “Arts District?” Wonderful, have cafes in artist studios in the curved building.
Park & Play
• Ramsey & San G - Park & Play - Liked sidewalk
“Steel stagecoach cutout as gateway (into Ramsey”
Unintelligible note (control, Baldwin park?)
Gradient
• Ramsey & San G - Gradient -
Trees might block business views.
Like additional trees in any concept.
Comments
Main St- Ramsey & San
Gorgonio
The Spark (9 Votes)
Park & Play (5 Votes)
Gradient (1 Vote)
Alleys
The Spark (9 Votes)
Park & Play (2 Votes)
Gradient (1 Vote)
1st Shared Street
The Spark (4 Votes)
Park & Play (1 Vote)
Gradient (5 Votes)
Complete Streets Design Board Results
82 771
Spark
Streetscape & Mobility- Gathering Spaces and Shared Street Public Realm/OS- Celebrate cultural, represents heart of city Park & Play
Gradient
Comments
Look & Feel Board Results
Streetscape & Mobility
The Spark (8 Votes)
Park & Play (2 Votes)
Gradient (1 Vote)
Public Realm/Open
Space & Placemaking
The Spark (9 Votes)
Park & Play (2 Votes
Gradient (0 Vote)
Land Use
The Spark (2 Votes)
Park & Play (1 Vote)
Gradient (2 Votes)
83772
Land Use & Open Space Board Results
The Spark (4 Votes)
Park & Play (5 Votes)
Gradient (0 Votes)
Spark
• Connect to Dorothy Cultural Center on 1st Street, Respect all historical resources.
• Church on 1st brings many people
• Oakland has opportunities for (unsure, heal atl?) always could be good.
• San Gorgonio: Hays to Williams, is it an “Arts District?” Wonderful, have cafes in artist studios in the curved building.
Park & Play
• Seniors can’t walk far to park
• More outdoor dining, many people have moved from OC/Irvine would love to see.
• Need to fix up to attract people.
• Want people to come here but not so (unsure, commental?) Live here, culture rich, history diverse. Famous people come here (for?) Christmas.
Gradient
• Fitness walk
• Lots of artists
• Like work/live
Comments
84 773
Mobility Board Results
The Spark (4 Votes)
Park & Play (2 Votes)
Gradient (1 Vote)
Spark
• Likes angled parking
• Likes parking / parklets
Park & Play
• Worry street parking being sacrificed on Park & Play
• Tone down color in theme. Want bikeshare opportunities, tone down bike lane
• Take into account (transplants?)
• Hasn’t had a problem with parking. Other back of house (parking) lots aren’t scary. City not big enough to utilize parking structure.
• Stopping and walking is fun in Banning, especially with places to visit (like proposed alleys, lots, Ramsey ideas.)
• Don’t really need parking on Ramsey if other lots can be utilized.
Gradient
• Likes median but also parklets
Comments
85774
Gateways Board Results
The Spark (6 Votes)
Park & Play (0 Votes)
Gradient (1 Vote)
Spark
• What became of the trolley around town?
• Likes light up, old town aesthetic. Flags are cool.
• Lightly connecting across street, should have one section that’s predominantly ped that has these.
Park & Play
• (likes that the) Interstate is very consistent (with regards to signage) get this stuff (designs like palm springs sign in pic) off interstate.
• Gateway after roundabout to pull people downtown
• Needs to be 8th Street where people are coming from freeway Gradient
Comments
86 775
Land Use Development Sites Board Results
Dev Site #3- Social Services
The Spark (1 Vote)
Park & Play (4 Votes)
Gradient (0 Votes)
Spark
Park & Play
Gradient
Dev Site #2- Civic Center
The Spark (2 Votes)
Park & Play (4 Votes)
Gradient (1 Vote)
• D2 - Remove hedges & keep trees in the park
• D2 - Like the idea of centralized parking
• D1 - Likes idea of artist housing, has to be done well Dev Site #1- SE Lot
The Spark (2 Votes)
Park & Play (2 Votes)
Gradient (2 Votes)
• D1 - “Bring a lot of people, establish residence”
Comments
87776
Plotted Maps For Comments
•Wanted to buy for food trucks or community garden with Boys & Girls Club • Signage Plan
• Protecting cleanliness and orderliness is important to Downtown. • (Park and Play) Best alternative for low foot traffic areas. • No low-income housing: “record in Banning has not been good (but affordable housing is OK”) • Lighting & safety is key for new people.
• Arts & Crafts businesses are coming.
• Stagecoach theme doesn’t draw young people.
• Connect to cultural center / gathering, used to be arts district. • Banks, DMV, Grocery gone. Emphasize diversity, So much history. Compare to Oakland. • Gut (?) the building & make into recreation. (1st and Hayes) • Boutique hotel with adjacent activity(?) pool.
Spark
Park & Play
Gradient
88 777
Other Comments From
Public Open House
• Concern from business owners about removal of parking on 1st. Business owner suggested building parking garage on Livingston.
• Concern that not enough effort was dedicated to understanding Native American culture/relationship to town. Pointed out the close proximity of the Dorthy Ramon Learning Center to the downtown project study area.
Walk Audit Comments
Site D1- SE Lot
• Have it be mixed-use
• San Gorgonio Inn was the anchor of the city. Style of the building was notewroty, and the Inn provided comfort food for the community. Incorporate old sign, which the city now has.
People coming in from the freeway will notice the sign as they’re driving by. • City has old sign in storage
Site D2- Civic Center
• Open this area up, have it be a civic space. Currently feels like dead space. People think it’s a scary space; homeless people mostly use it.
Site D3- Social Services Building
Alleys
• Can tie them into events that happen at banquet home, and any other adjacent business/city.
• Students and pedestrians will utilize them.
• Have to be maintained and kept clean.
• Provide enclosures for trash.
• Provide shading.
• Keep them closed at night, but still retain access for maintenance vehicles. 1st St
• Where most people park for Fox Theater.
• Fox Theater needs access from the front at all times (city laws). • Need signage to let people know where parking is at.
• There are drainage problems at the emergency exits, back of Fox.
Boys & Girls Club
• Splash pad for when it’s hot during the summer?
• Have it be a public/private space – kids get exclusive access during certain times of the day.
General Comments
• City needs much more open space.
• Local indigenous tribe would want to incorporate their art • Stagecoach them is dying because it doesn’t appeal to the current demographic. • There is a landlord across from the Fox Theater that refuses to do anything with it – is currently vacant.
• Smaller trees at Ramsey St so not to block business signage. • Keep semi trucks out of Ramsey.
89778
MOBILITY ALTERNATIVES
90 779
Enhanced Crosswalk Bike Lanes Transit Widen Sidewalk
The Spark
RESTORE DOWNTOWN AS THE HEART OF THE COMMUNITY
Shared Street
Mobility
• 8th - 4th: Class IV lanes and more typical existing sidewalk widths.
Median turn lane.
• 4th - San Gorgonio: Standard sidewalks. Class IV bike lanes. Angled parking and parklets predominantly on north side but can be on south.
• San Gorgonio - Martin: Class IV bike lanes. Parallel parking. • 1st St/Alleys: 1st Street north and south are shared streets which are primarily pedestrian with design treatment to enhance that experience. Vehicular movement is slowed with minimal parking.
Alleys are hardscaped with historic inspired design and allow for engaging pedestrian experience and mobility.
• Livingston: Parking on north side of street offsets parking removed from Ramsey. Livingston could also be used as Truck route to divert truck traffic from Ramsey.
91780
13’ 6’ 3’ 10’ 10’ 10’ 3’ 6’ 13’ 10’ 6’ 2’ 11’ 11’ 15’ 2’ 6’ 11’ 10’ 5’ 3’ 8’ 11’ 11’ 8’ 3’ 5’ 10’ • Class IV 6’ lanes.
• Median turn lane.
• Class IV 6’ lanes.
• Angled parking/parklets (can switch to either side).
• Class IV 5’ lanes.
• Parallel parking both sides.
-Protected with bollards, planters, etc.
-Buffered using wide painted striping
• LEGEND
92 781
Shared Use Sidewalk Bike Lane Enhanced Crosswalk Parking Park & Play
GREAT HUBS, ACTIVE SPACES
Traffic Calming, Roundabout
Mobility
• 8th - 4th: Boulevard with trees in wide median enhances entrance from 8th to downtown for all users and slows vehicle speeds. Turn pocket also within median. Class IV bike facilities for complete street activity.
• 4th - SG: Wider paseo shared use sidewalk on north side. Allows for bikes. Parallel parking on north side. South sidewalk is also wider. • San Gorgonio - Martin: Boulevard similar to 8th-4th. Wider sidewalk on north side by civic center.
• 1st St/Alleys: Wide shared-use sidewalks allow active transportation users. Alleys incorporate art and colorful elements and are key connections from parking to spaces downtown.
• Livingston: Parking on north side of street offsets parking removed from Ramsey. Possible couplet with Bryant Street on other side of I-10.
Livingston could also be used as Truck route to divert truck traffic from Ramsey.
• Roundabout: Roundabouts at 4th and Martin slow traffic coming into downtown and create opportunities for gateway elements in the middle. Traffic circles can also have protected facilities for active transportation users.
93782
10’ 6’ 2’ 12’ 14’ 12’ 2’ 6’ 10’ 16’ 11’ 11’ 8’ 28’ 10’ 6’ 2’ 10’ 8’ 10’ 2’ 6’ 20’ • Class IV 6’ lanes.
• Median doubles as turn pocket.
• Shared use sidewalk allows bikes and pedestrians.
• One lane parallel parking.
• Class IV 6’ lanes.
• Wider north sidewalk.
• No parking.
-Protected with bollards, planters, etc.
-Buffered using wide painted striping
• LEGEND
94 783
Gateway Features Enhanced Crosswalk Bike Lanes Transit Wide Sidewalk Gradient
LIVE/WORK BANNING, BLURRING THE LINES
Mobility
• 8th - 4th: Boulevard with trees in median enhances entrance from 8th to downtown for all users and slows vehicle speeds. Class IV bike facilities and wider sidewalks promote all modes of travel. Turn pockets incorporated into wider median.
• 4th - SG: Boulevard with Class IV bike lanes. Slightly wider north sidewalk.
• SG - Martin: Wide shared-use sidewalk on southside accommodates all active transportation users. Tree lined median slows traffic coming into downtown. Parallel parking on either side.
• 1st St/Alleys: Green infrastructure focused design. 1st transitions from shared-use sidewalks to Shared Streets which relates to shift of land use from commercial mixed use to residential.
• Livingston: Parking on north side of street offsets parking removed from Ramsey. Possible couplet with Bryant Street on other side of I-10.
Livingston could also be used as Truck route to divert truck traffic from Ramsey.
95784
18’ 8’ 11’ 8’ 11’ 8’ 10’
• Class IV 6’ Lanes.
• Median doubles as turn pocket.
10’ 6’ 2’ 12’ 14’ 12’ 2’ 6’ 10’ 10’ 6’ 2’ 11’ 8’ 11’ 2’ 6’ 18’ • Boulevard with wider sidewalk north side and in front of Fox Theater on south side.
• No parking.
• Boulevard.
• Shared use sidewalk south side.
• Parallel parking both sides.
-Protected with bollards, planters, etc.
-Buffered using wide painted striping
• LEGEND
96 785
ALTERNATIVE 2: PARK & PLAY
SECTION A-A
SECTION B-B
ALTERNATIVE 1: THE SPARK
SECTION A-A
SECTION B-B
ALTERNATIVE 3: GRADIENT
SECTION A-A
SECTION B-B
• Two-way cycle track east side, (Class 2B south of Ramsey). • One side angled parking.
• Two-way cycle track east side, (Class 2B south of Ramsey). • Parallel parking both sides.
• Two-way cycle track east side, (Class 2B south of Ramsey). • Parallel parking both sides.
• Class IV 6’ lanes.
• Median turn lane.
• Class IV 6’ lanes.
• Median doubles as turn pocket.
• Class IV 6’ lanes.
• Median doubles as turn pocket.
13’ 6’ 3’ 10’ 10’ 10’ 3’ 6’ 13’ 10’ 6’ 2’ 12’ 14’ 12’ 2’ 6’ 10’ 23’ 15’ 11’ 11’ 3’ 12’ 25’ 22’ 8’ 10’ 10’ 8’ 8’ 12’ 22’ 22’ 8’ 10’ 10’ 8’ 8’ 12’ 22’ 10’ 6’ 2’ 12’ 14’ 12’ 2’ 6’ 10’
Mobility Summary
8th St to 4th St
97 Spark
Class IV
8 6 8
12 Class IV Class IV
Class II/IIB
Shared Use
SId
e
w
alk
Class IV HAYS
ALESSANDROMARTIN
4TH3RD2ND1ST
6TH
8TH
LIVINGSTON
RAMSEY
SAN GORGONIO
Class IV Two-way Class IV Two-way
Shared Street Shared Street
7 7
13 Shared Use
SId
e
w
alk
Shared Use
SId
e
w
alk
Blvd. Class IIB or
Protected
Roundabout
Class II/IIB
Class IV Two-way Class IV Two-way
Class IV Two-way-South
Blvd. Class IIB or IV
Park N Play
4TH3RD2ND1ST
6TH
8TH
SAN GORGONIO
HAYS
LIVINGSTON
RAMSEY
Shared Use SW North
Gradient
Protected
Roundabout Blvd. Class IIB or IV.
7 Class II/IIB
4TH
6TH
8TH
Class IV Two-way
B B B B
B B
A
A
A
A
A
A
786
SECTION A-A
SECTION B-B
SECTION A-A SECTION A-A
SECTION B-B
ALTERNATIVE 1: THE SPARK ALTERNATIVE 2: PARK & PLAY ALTERNATIVE 3: GRADIENT • Shared Street- mixed people and auto and allows cars
slowly, possibly has a few parking spaces.
• Shared Street- mixed people and auto and allows cars
slowly, possibly has a few parking spaces.
SECTION B-B
• Shared use sidewalks.
• Parallel parking.
4th St to San Gorgonio
• Class IV 6’ lanes.
• Angled parking/parklets (can switch to either side). • Shared use sidewalk allows bikes and pedestrians. • One lane parallel parking.
10’ 6’ 2’ 11’ 8’ 11’ 2’ 6’ 18’
• Boulevard with wider sidewalk north side and in front of Fox Theater on south side.
• No parking.
10’ 6’ 2’ 11’ 11’ 15’ 2’6’ 11’ 16’ 11’ 11’ 8’ 28’
14’ 56’ 18’ 26’ 8’ 10’ 10’ 8’ 26’ 14’ 56’ 18’
98 Class IV
6 8
12 Class IV
Class II/IIB
Shared Use
SId
e
w
alk
Class IV HAYS
ALESSANDROMARTIN
4TH3RD2ND1ST
LIVINGSTON
RAMSEY
SAN GORGONIO
Class IV Two-way Class IV Two-way
Shared Street Shared Street
7 7 7
13 Shared Use
SId
e
w
alk
Shared Use
SId
e
w
alk
Blvd. Class IIB or IV
Protected
Roundabout
Class II/IIB
Class IV Two-way Class IV Two-way
Class IV Two-way-South
Blvd. Class IIB or IV
Park N Play
ALESSANDROMARTIN
4TH3RD2ND1ST
6TH
8TH
SAN GORGONIO
HAYS
LIVINGSTON
RAMSEY
Shared Use SW North
Gradient
Blvd. Blvd
Protected
Roundabout Blvd. Class IIB or IV.
13 7 6
Class II/IIB
Class IV Two-way-South Side
4TH3RD2ND1ST
6TH
8TH
SAN GORGONIO
HAY
LIVIN
RAM
Class IV Two-way Class IV Two-way
Class IV
Shared StreetShared Street
B B B B B B
A
A
A
A
A
A
787
8 Class IV
HAYS
ALESSANDROMARTIN
LIVINGSTON
RAMSEY
SAN GORGONIO
Class IV Two-way
Gradient
Blvd. Blvd. Shared Use SW South
Protected
Roundabout Blvd. Class IIB or IV.
13 7 6 5
Class II/IIB
Class IV Two-way-South Side
ALESSANDROMARTIN
4TH3RD2ND1ST
6TH
8TH
SAN GORGONIO
HAYS
LIVINGSTON
RAMSEY
Class IV Two-way Class IV Two-way
Class IV
Shared StreetShared Street
A
A
A
A
7 7
13 Shared Use
SId
e
w
alk
Shared Use
SId
e
w
alk
Blvd. Class IIB or IV
Class II/IIB
Class IV Two-way Class IV Two-way
Class IV Two-way-South
ALESSANDROMARTIN
4TH3RD2ND1STSAN GORGONIO
HAYS
LIVINGSTON
RAMSEY
Shared Use SW North
San Gorgonio to Martin
ALTERNATIVE 2: PARK & PLAY
SECTION A-A
ALTERNATIVE 1: THE SPARK
SECTION A-A
ALTERNATIVE 3: GRADIENT
SECTION A-A
18’ 8’ 11’ 8’ 11’ 8’ 10’
• Boulevard.
• Shared use sidewalk south side.
• Parallel parking both sides.
10’ 6’ 2’ 10’ 8’ 10’ 2’ 6’ 20’
• Class IV 6’ lanes.
• Wider north sidewalk.
• No parking.
• Class IV 5’ lanes.
• Parallel parking both sides.
10’ 5’ 3’ 8’ 11’ 11’ 8’ 3’ 5’ 10’
A
A
99788
DEVELOPMENT SITES
100 789
Games and Entertainment Food and Leisure Spaces Hotel, Conference (Park and Play)
Mixed-Use Residential
(Spark)
Artist Housing
(Gradient)
Development Site #1
CITY-OWNED SITE
This 5.10-acre site consisting of multiple parcels owned by the City of Banning/Banning Successor Agency is the former home of the San Gorgonio Inn and the largest vacant opportunity in Downtown Banning.
From a market perspective, the site presents opportunities for highway-oriented uses such as hospitality; it also has sufficient size to possibly create the kind of amenities desired by a market-rate or multifamily housing project. Either hotel or residential uses would bring significant population into the downtown to energize the retail core.
Since the City purchased the site in 2007, it has been subject to several attempts at redevelopment; the current proposal is for a combination hotel and mixed-use project. Any disposition of the site by the City of Banning will be subject to the Surplus Land Act (2019) which requires that the property first be offered to one of:
• A qualified affordable housing developer for the development of 100% affordable housing • A mixed-use development containing at least 300 residential units, with 25% affordable units Demand for high-density market-rate residential may be limited in Banning, so pursuing an affordable housing development is likely a good strategy. Affordable housing developments might be developed for families or artists. A 100% affordable housing project would likely not fill the entire site, leaving other parts of the site for retail, hospitality and entertainment uses.
Spark: Mixed-Use Residential Concept
Park and Play: Hotel, Conference and Civic Park Concept Gradient: Affordable Housing for Artists and Creative Production Concept FOCUS: COMPETITIVE SOCIALIZING ENTERTAINMENT
FACILITY
(Park and Play, R2)
The southwestern portion of the site, in particular, presents opportunities for an entertainment-oriented use that forms a bridge between the larger use that occupies most of the site and the Downtown Core’s entertainment offerings to the west. One of these uses could be a “Competitive socializing entertainment facility.” Also known as ‘Eat N Play’ or ‘Sports-tainment’, this facility would serve specific sections of the entertainment market looking for entertainment-type activities that can be done in larger groups and/or feature a more hands-on, active, and competitive type of entertainment. These activities often include blending physical activities with food and beverage offerings, utilizing new and upcoming technologies, and incorporating general hanging out as an amenity. Uses proposed to provide a niche market offering and encourage outside visitors and guests who may not otherwise visit downtown Banning.
101790
HIGH DENSITY MIXED-USE
RESIDENTIAL CONCEPT
MF1
MF1
MU1
MU1
MU2
MU2
P1
P1
P2
P2
MULTI-FAMILY RESIDENTIAL: • Resi Area: 41,888 SF • Resi Units Per Floor: 43 • Floors: 2-4 • Total Resi Units: 135 SURFACE PARKING LOT: • Parking Area: 56,815 SF • Total Parking Spaces: 174 MIXED-USE RESIDENTIAL #1: • GF Retail Area: 8,796 SF • Upper Floor Resi Area: 8,796 SF • Resi Units Per Upper Floor: 9 • Total Floors: GF+2 • Total Resi Units: 18 MIXED-USE RESIDENTIAL #2: • GF Retail Area: 9,156 SF • Upper Floor Resi Area: 9,156 SF • Resi Units Per Upper Floor: 9 • Total Floors: GF+3 • Total Resi Units: 27 PARKING GARAGE #2: • Parking Area: 24,699 SF • Parking Spaces Per Floor: 76 • Floors: 2 • Total Parking Spaces: 152 MF1
P1
MU1
MU2
P2
102 791
HOTEL/CONFERENCE CENTER: • Hotel Area: 18,309 SF • Conference Area: 5,000 SF • Rooms On GF: 20 • Rooms On Upper Floors: 36 • Floors: GF+3 • Total Rooms: 128 MULTI-FAMILY RESIDENTIAL: • Resi Area: 32,492 Sf • Resi Units Per Floor: 34 • Floors: 5 • Total Resi Units: 170 PARKING GARAGE: • Parking Area: 53,787 Sf • Parking Spaces Per Floor: 165 • Floors: 3 • Total Parking Spaces: 495 SURFACE PARKING LOT: • Parking Area: 16,029 SF • Total Parking Spaces: 49 IN-FILL RETAIL: • Retail Area: 6,377 SF
ENTERTAINMENT USE: • Retail Area: 14,406 SF
HOTEL/CONFERENCE CONCEPT
H1
P1
R1
R2
P2
MF1
H1
P1
R1
R2
P2
MF1
H1
P1
R1
R2
P2
MF1
103792
MULTI-FAMILY RESIDENTIAL #1: • Resi Area: 15,389 SF • Resi Units Per Floor: 16 • Floors: 2 • Total Resi Units: 32 SURFACE PARKING LOT #1: • Parking Area: 13,990 SF • Total Parking Spaces: 46 MULTI-FAMILY RESIDENTIAL #2:
• Resi Area: 17,427 SF • Resi Units Per Floor: 18 • Floors: 2 • Total Resi Units: 36 SURFACE PARKING LOT #2: • Parking Area: 15,842 SF • Total Parking Spaces: 52 MULTI-FAMILY RESIDENTIAL #3: • Resi Area: 740 SF • Floors: 2 • Total Resi Units: 20 • Parking: Under Unit MULTI-FAMILY RESIDENTIAL #4: • Resi Area: 740 SF • Floors: 2 • Total Resi Units: 20 • Parking: Under Unit IN-FILL RETAIL #1: • Retail Area: 2,640 SF
IN-FILL RETAIL #2: • Retail Area: 3,696 SF
CREATIVE OFFICE / HYBRID
INDUSTRIAL #1: • Commercial Area: 8,171 SF
CREATIVE OFFICE / HYBRID
INDUSTRIAL #2: • Commercial Area: 8,171 SF
MF1
P1
MF2
R1
R2
P2
MF3
MF4
C1
C2
P1
MF2
R2 R1
P2
C2 C1 MF4 MF3
MF1
P1
MF2
R1
R2
P2
MF3
MF4
C1
C2
MF1
AFFORDABLE HOUSING FOR
ARTISTS CONCEPT
104 793
Development Site #2
CITY HALL EXPANSION
Corner Civic Center
(Park and Play)
Corner Civic Park
(Spark)
Flexible Park
(Gradient)
Public/Private Partnership New Civic Park
Opportunity Site #2 is the footprint of Banning City Hall, which form part of the Civic Center along with the Police Department, County Courthouse, Fire Department, Probation Office and the U.S. Post Office. City Hall is currently over capacity, and an expansion will likely be required in the medium-term future as the City continues to grow and demand for services increase.
The location and size of the site makes it an interesting location for public parking facilities that can serve civic office uses during the day and retail uses during nights and weekends. Expansion of civic facilities could be coupled with expanded parking facilities to serve the downtown more broadly. However, the cost of construction of both state-of-the-art civic meeting and office facilities and parking garages is very significant. Any development would take place in phases over a long period of time.
Finally, City Hall currently lacks relationship to the corner of San Gorgonio and Ramsey which is the center of downtown and includes such historic neighbors as the Haven Building and Coplin House. The three concepts show three different methods of reimagining this corner.
Spark: Corner Civic Park Concept
Park and Play: Corner Building Concept
Gradient: Flexible Park/Parking Concept
FOCUS: CIVIC REDEVELOPMENT USES (PARK AND PLAY)
Many cities have undertaken redevelopment of their civic centers. In an era of limited local budgets, cities have turned to public-private partnerships to achieve their upgraded facilities. Taking advantage of excess landholdings and the transition to work-from-home, developers reduce the physical footprint of City Halls and in its place install community-oriented open spaces and new commercial or mixed-use development.
105794
PHASE 1:
New City Hall expansion building to be
located within current parking lot. • New Civic Area: 23,214 SF PHASE 2:
Demolish existing City Hall
PHASE 3:
New City Hall expansion building,
located facing Ramsey. • New Civic Area: 18,920 SF
PHASE 4:
New structured parking garage to
replace former City Hall site on back
site, located facing Hays. • Parking Area: 31,524 SF • Parking Spaces Per Floor: 96 • Floors: 2 • Total Parking Spaces: 192
CIVIC CENTER EXPANSION
CONCEPT #1
PH1
PH2
PH3
PH4
PH1
PH1
PH3
PH3
PH4
PH4
PH2
106 795
PHASE 1:
New City Hall expansion building to be
located at the corner of San Gorgonio and
Ramsey, replacing Carpenter Hamilton
park, and to orient city functions toward the
existing downtown core, ground floor retail to
line Ramsey and activate the corner. • New Civic Area: 16,070 SF PHASE 2:
New garage expansion into existing City Hall
surface parking lot • Parking Area: 23,173 SF • Parking Spaces Per Floor: 71 • Floors: 2 • Total Parking Spaces: 142 PHASE 3:
Existing Civic Hall demolition.
PHASE 4:
New civic park to replace part of previous
City Hall building (explore perhaps preserving
some part of old building for within park).
PHASE 5:
New structured parking garage to replace
former City Hall site on back site, towards
Hays, connect to Phase 2 garage to expand
garage capacity and provide central
downtown parking garage for all destinations • Parking Area: 19,510 SF • Parking Spaces Per Floor: 60 • Floors: 2 • Total Parking Spaces: 180
CIVIC CENTER EXPANSION
CONCEPT #2
PH1
PH2
PH3
PH4
PH5
PH1
PH2
PH3
PH5
PH4
PH2 PH1
PH3
PH5
PH4
107796
PH1
PH1
PHASE 1:
• Flexible Civic Center park
• Total Parking Spaces: 65
CIVIC CENTER EXPANSION
CONCEPT #3
PH1
108 797
FOCUS: THEMED ATTRACTORS
These businesses are distinctly branded to be highly visible and seen from afar, offer a comfortable and inviting place to welcome visitors, and provide a unique type of place / experience / offering that makes them a destination and mainstay where they operate. Good signage and store positioning help them be seen from nearby thoroughfares and be reached from what would normally be a pass-by experience. These businesses typically serve outside customers but employ local residents to fulfill two important market goals.
Destination Rest Stops: offer upgraded travel services and food offerings, comfortable and clean facilities, fuel and charging stations, rest and relax areas, and other travel amenities. A well-known example is Buc-ee’s in Texas, these types of facilities offer a distinctly different experience from the typical gas station or convenience store.
Specialty Farmer’s Market: provide a unique place to showcase and sell goods coming from the local market and offer a venue for local businesses to collectively gather and reach outside markets. Hadley’s Fruit Orchard is a local example. Unique branding and design give these businesses a distinctly local flavor and distinctly different experience from the typical grocery store or supermarket.
Development Site #3
4TH STREET INTERSECTION
Main Street Retail
(Park and Play)
Neighborhood Shopping
Center (Spark)
Live/Work Townhomes
(Gradient)
Buc-ee’s Hadley’s Fruit Orchards
The intersection of Ramsey Street and 4th Street contains a variety of vacant and underutilized properties under private ownership which can together strengthen the key ideas at play in each of the three concepts.
The largest property, located at the southwest corner, is a former grocery store which is currently leased out as a public assistance office to the Riverside County Department of Public Social Services. Over the medium- to long-term, this tenant might be relocated into the Civic Center and the property be made available to a use that is more coherent with the direction of the adjoining neighborhood. This property also has excellent freeway frontage which could be taken advantage of through pylon signage and branding.
The concepts also explore different methods for development to relate to the mixed single-family/multi-family/ commercial/industrial context of the blocks around this intersection.
Spark: Neighborhood Shopping Center and Residential Concept Park and Play: Destination Rest Stop Concept
Gradient: Live/Work and Production Concept
109798
MIXED-USE RESIDENTIAL #2:
• GF Retail Area: 3,471 SF
• Upper Floor Resi Area: 6,930 SF
• Resi Units Per Floor: 7
• Total Floors: GF+1
• Total Resi Units: 11
MULTI-FAMILY RESIDENTIAL #1 (4-PLEX):
• Resi Area: 1,816 SF
• Resi Units Per Floor: 2
• Floors per Building: 2
• 4-plex Buildings: 4
• Total Resi Units: 16
• Parking: Unit Garages on Site
MULTI-FAMILY RESIDENTIAL #2:
• Resi Area: 9,742 SF
• Resi Units Per Floor: 10
• Floors: 2
• Total Resi Units: 20
• Parking: Unit Garages on Site
•
MULTI-FAMILY RESIDENTIAL #3:
• Resi Area: 6,600 SF
• Resi Units Per Floor: 7
• Floors: 2
• Total Resi Units: 14
SURFACE PARKING LOT #2:
• Parking Area: 6,600 SF
• Total Parking Spaces: 22
IN-FILL RETAIL #1:
• Retail Area: 7,300 SF
IN-FILL RETAIL #2:
• Retail Area: 5,500 SF
IN-FILL RETAIL #3:
• Retail Area: 5,540 SF
EXISTING COUNTY SERVICES BUILDING
• Converted to New Grocery Store:
• Commercial Area: 27,000 SF
NEIGHBORHOOD SHOPPING CENTER AND
RESIDENTIAL CONCEPT
P1
MF1
MF2
MF3
MIXED-USE RESIDENTIAL #1:
• GF Retail Area: 7,607 SF
• GF Resi Area: 7,171 SF
• GF Resi Units: 7
• Upper Floor Resi Area: 14,750 SF
• Resi Units Per Upper Floor: 15
• Total Floors: GF+2
• Total Resi Units: 37
SURFACE PARKING LOT #1:
• Parking Area: 15,930 SF
• Total Parking Spaces: 32
MU1
P2
MU2
R1
R2
R3
C1
MF1 MF2
MF3
MU1
MU2
R1
R2 R3
C1
MF1
MF2
MF3
MU1
MU2
R1
R2
R3
C1
P1
P2
110 799
IN-FILL RETAIL #1:
• Retail Area: 4,600 SF
IN-FILL RETAIL #2:
• Retail Area: 4,600 SF
IN-FILL RETAIL #3 - NEW
LAUNDROMAT:
• Retail Area: 4,800 SF
EXISTING COUNTY SERVICES
BUILDING:
Converted to New Destination Rest Stop
• Commercial Area: 27,000 SF
SURFACE PARKING LOT/ ELECTRIC
VEHICLE CHARGING:
• Total Parking Spaces: 146
DESTINATION REST STOP
CONCEPT
R1
R2
R3
C1
P1
R1
R3 R2
C1 P1
R1
R2
C1 R3
P1
111800
LIVE/WORK AND PRODUCTION
CONCEPT
MU1
MU2
MU3
MU4
MF1
C1
C2
MU1
MU2
MU3
MU4
MF1
C1
C2
C2
MU1
MU2
MU3
MU4
MF1
C1
C2
C2
MIXED-USE LIVE/WORK #1: • GF Retail Area: 550 SF • Upper Floor Live/Work Area: 990 SF • Total Floors: GF+2 • Total Resi Units: 5 MIXED-USE LIVE/WORK #2: • GF Retail Area: 550 SF • Upper Floor Live/Work Area: 990 SF • Total Floors: GF+2 • Total Resi Units: 5 MIXED-USE LIVE/WORK #3: • GF Retail Area: 550 SF • Upper Floor Live/Work Area: 990 SF • Total Floors: GF+2 • Total Resi Units: 5 MIXED-USE LIVE/WORK #4: • GF Retail Area: 990 SF • Upper Floor Live/Work Area: 990 SF • Total Floors: GF+2 • Total Resi Units: 5 MULTI-FAMILY RESIDENTIAL #1: • Resi Area: 5,758 SF • Resi Units Per Floor: 6 • Floors: 2 • Total Resi Units: 12 • Parking: Unit Garages on Site
CREATIVE OFFICE / HYBRID
INDUSTRIAL: • Commercial Area: 12,633 SF
EXISTING COUNTY SERVICES
BUILDING
Converted to Creative Office / Hybrid
Industrial Complex (with New Buildings): • Commercial Area: 47,200 SF 112 801
113802
TOOLKIT
This section highlights core elements of a downtown revitalization and complete streets toolkit that was used for this planning project and will serve as a guide for implementing the design elements outlined in this plan. 114 803
115804
Large scale plaza and civic space
Roadway Streetscape - Shade and urban
greening
Small scale plaza or courtyard
Alley paseo - Activated with greening
Sidewalk extension and parklet
Recreational Park - Play equipment and family
areas
4 1
5 2
6 3
Open Space and Connection Toolkit
Goals:
• Link new development areas and fill in activity gaps with a diverse network of open spaces and connections.
• Consider incorporating portions of San Gorgonio north of Hays into the study area to improve connectivity to the City’s neighborhoods
• Create centers of activity by providing open spaces that complement immediately proximate assets
Toolkit:
1. Roadway Streetscapes
• Street trees, shade, site furnishings, wayfinding signage, and pedestrian lighting
• Comfortable for strolling and seating
• Part of Complete Streets corridors
• Activated and vibrant
2. Alleys and Paseos
• Pedestrian-scaled walkways and building cut-throughs
• Programmed for use
• Expand greening and infiltration opportunities
3. Recreational Parks
• Recreation focused, sports fields, kids play areas
• Green and pastoral, less urban
4. Larger Scale Plazas and Civic Spaces
• Community events, activities and gatherings
• Civic scale placemaking features and elements
• Multi-purpose seating opportunities
5. Smaller Scale Plazas and Courtyards
• Small gathering and individual hang out opportunities • Intimate spaces and/or business supporting public spaces • Shade and greening
6. Sidewalk Extensions and Parklets
• Expand local business operations
• Help activate adjacent streetscapes and businesses
7. Recreational Greenways
• Multi-use regional trails and bikeways
• Urban greening and stormwater infiltration
• Promote health and wellness
116 805
Placemaking, Events, and Downtown
Programing Toolkit
GOALS:
• Vigorously program events and spaces to attract new
people to downtown
• Provide attractions for a variety of people, with a variety of interests, throughout the day and year
• Establish a funded and effective governing and
implementing structure connected to local government
and business
TOOLKIT:
Activities
1. Outdoor Dining
2. Shopping / Strolling
3. Entertainment / Gathering
/ Hanging Out
4. Family-oriented Activities
5. Dog-friendly Activities
6. Remote Working
7. Tourism
Events
8. Farmers Market
9. Seasonal Events (4th of July,
Christmas, etc)
10. Car Shows
11. Art Show / Art Walk
12. Food / Tasting Events
13. Outdoor Movie Night
14. Arts and Crafts Shows
15. Small Concert and Music
Shows
16. Outdoor Garden Show
17. Block Party
18. Pop-up and Sponsored
Events
19. Private Event Hosting
Elements
20. Public Art
21. Signage and Wayfinding
22. Pedestrian Lighting
23. Public Wi-Fi Hot Spots
24. Kid’s Play Elements
25. Interactive Play and
Gaming Features
26. Interactive Lighting and
Experiential Art Installations
27. Bike Parking
28. Multi-purpose Seating and
Benches
29. Monument and Gateway
Elements
30. Upgraded Crosswalks
31. Planting and Urban
Greening
32. Accent Paving and Focal
Points
33. Food and Beverage Kiosks
34. Food Trucks
35. Social Media Moments
36. Temporary Road Closure
Elements
37. District Branding Elements
38. Shading and Human
Comfort
District signage and gateway element
Outdoor dining and entertainment Farmer’s Market Mural art and story telling Canopy lighting Upgraded crosswalks
2 8
22 30
20 37
117806
Low Density Apartment
- The Charlie La Mirada
25 Units, 0.8 Acre, 29 du/ac
Major Mixed-Use
- New Majestic Apartments, Perris
23 Units, 1.0 Acre, 24 du/ac
Row Homes - Houston Lot Development
10 Units, 0.53 Acre, 19 du/ac
Infill Mixed-Use - Palomar Heritage Building,
Temecula 22 Units, 0.4 Acre, 58 du/ac
Bungalow Court - South LA Bungalow Court
8 Units, 0.2 Acre, 40 du/ac
Senior Affordable Housing - Mission
Village Senior, Moreno Valley
102 Units, 2.4 Acres, 43 du/ac
5 1
7 2
8 3
Housing Type Site Size Tenure/ Affordability
Less than
1 Acre
More than
1 Acre
Affordable Rental Ownership
1. Major Mixed-Use
2. Infill Mixed-Use
3. Senior Affordable
4. Family Affordable
5. Low-Density
Apartment
6. Live/Work
7. Row House
8. Bungalow Court
Housing Toolkit
Downtown Banning needs to attract more people, and there is no more sure method to doing so than building housing within the area. Given long-term trends and the economic climate of the past decade, it is likely that most new ground-up development within the area will need to be entirely or largely composed of residential uses to be feasible. Multifamily and attached singlefamily housing would be an appropriate addition to side streets within the downtown area, and multifamily housing could be located on upper floors of commercial mixed-use buildings. These housing types should be geared toward demographics that would make the most use of downtown amenities and businesses, and which are not well served by current development patterns in the city. Apartments for younger people are a clear need, but downsized housing for empty nesters and multifamily housing for independent seniors could also be appropriate.
As illustrated in the Opportunity Sites figure (#2), sites that could be potentials for housing development are mostly less than one acre in size. The small size of parcels poses challenges for development from a physical standpoint, requiring the City to provide a great deal of flexibility on development standards; it also means that larger developers of the type that have been responsible for most recent construction in Banning will not be interested in developing. Through creating simple standards for development, or even preapproved plans, and outreach and assistance to the local construction and development industry, Banning could encourage the development of these small sites by locals, building wealth within the community.
With the site across from City Hall, the City does have at least one large parcel which presents an opportunity for a larger-scale development which might include housing. The City-owned site will be subject to the Surplus Land Act, meaning that the property must either be offered first for affordable housing or else consist of a mixed-use project with at least 300 residential units, 25% of which are affordable. The construction of a quality affordable housing project could meet a significant community need while beautifying the area and spurring future private investment in housing once market conditions improve.
214’
310’
66’
107’
133’
145’
133’
118 807
Electric vehicle charging stations
Food-Focused Community Gathering Spaces
Niche Retail
Programmed, privately run open space
supporting food-focused community gathering
spaces or other downtown entertainment
Niche Experiences
Commercial Mixed-Use with Community-Oriented
Ground-Floor Space
4 2
5 2
6 3
Commercial and Retail Toolkit
GOALS:
• Introduce new commercial uses which bring vitality to Downtown, which encourage people to linger and visit
multiple businesses within the area
• Complement existing businesses with new synergistic and proximate commercial uses
• Seek commercial types that appeal to local clientele, including residents of future housing developments, but also tap into the large potential demand of I-10 drivers making longer trips
• Consider businesses which can fit into a unique theme or branding for Downtown Banning which can help attract
regional tourism and passthrough travel
TOOLKIT:
1. Independent Restaurants and other Food and Drink
2. Food-Focused Community Gathering Spaces (e.g. Food Halls) • Supported with programming such as events, art, music • Mix indoor and outdoor spaces – potential tie-in with public open spaces to create more of an attraction
3. Commercial Mixed-Use with Community-Oriented GroundFloor Space • Incorporate highly demanded facilities such as selfstorage, data centers, small-scale logistics on upper floors or at rear of large properties in order to subsidize communityserving uses such as artist studios, community clinics or social service organizations on ground floor or street frontage
4. Electric vehicle charging stations (Tesla Supercharger) • Limited competition currently. Should be well signed and advertised
• Consider distributed network spreading people
throughout downtown
• Consider valet service at peak times
5. Niche Retail (e.g. Local Flora Nursery, Novelty Shops, Galleries) • Would be supported if related to a particular downtown theme or brand
• For example, outdoor/desert mountain theme could be
supported by a nursery/landscape design center featuring local flora like Cholla, Ocotillo, Desert Willow, Blue Palo Verde, Brittlebush, Jojoba, California Barrel Cactus, and Chuparosa
6. Niche Experiences
• Would be supported if related to a particular downtown theme or brand
• For example, Old West/Stagecoach theme could be
supported by indoor shooting ranges with historic weapons 119808
Raised Crosswalks- Connects pedestrians at
sidewalk height while slowing vehicles
Class IV More extensive- Painted and physical
elements separating cyclists
Curb Extensions- Shortens crossing distance while
slowing vehicles
Class IV Less Intense- Separated bike lanes using
simple buffer and vertical separation
Midblock Median- Reduces exposed crossing
distance and creates safe waiting space.
RRFB Flashing beacons- Alert drivers of
pedestrians that trigger them at non-signalized
crossings
4 1
5 2
6 3
Complete Streets Toolkit
GOALS:
• Create spaces and connections that are safe and pleasant for non automotive users
• Provide Signage and information for easier navigation of downtown on all modes of travel
TOOLKIT:
1. Class IV Protected Bike Infrastructure- More Intense • Uses concrete curbs to separate cyclists from traffic • Paint or thermoplastic used to highlight bikeway
2. Class IV Protected Bike Infrastructure- Less Intense • Uses less “permanent” elements like planters, bollards, plastic/ concrete barriers.
• Not always painted
3. Rectangular Rapid-Flashing Beacon (RRFB)
• Helpful for midblock crossings where signal is not an option •
4. Raised Crosswalks
• Crosswalk on top of vertical deflection speed table
• Can be painted, brick, or other treatment
• Pedestrians feel safer in raised space for them within roadway
5. Curb Extensions
• Shorten crossing distance
• Act as horizontal deflection to reduce speeding
• Adds space for planting and other streetscape elements
6. Sidewalk Extensions and Parklets
• Used at signalized or unsignalized intersections
• Create protected space for pedestrians and cyclists
120 809
Speed Tables- Helps maintain slower
speeds on local and downtown streets
Real-Time Transit Information- Prevents
riders from waiting for no-show service
Chicanes and Pinch-points- Slow traffic on
local streets while providing more space for
amenities.
Pedestrian-Scale Lighting- Safer and more
enjoyable condition
Raised Intersections- Changes environment
from car to pedestrian orientation
Shaded Transit Shelters- Creates pleasant
waiting environment for transit riders
7 8 9
7. Raised Intersections
• Brings attention to pedestrian environment having crossings at same height as sidewalks
• Slows vehicles down transitioning into crossing area
• Materials other than asphalt can be used to change aesthetic to more pedestrian oriented area
8. Speed Tables and Humps
• Used to reduce speeds to 15-25 mph
9. Chicanes and Pinchpoints
• Slow speed through horizontal deflection
• Increase amount of public space available on corridor that can be activated using street furniture or other amenities
10. Shaded Transit Shelters
• Makes waiting for transit comfortable and safe on high temperature or rainy days
11. Real-Time Transit Information
• Provides transit riders with information to give peace of mind waiting for service
12. Pedestrian-Scale Lighting
• Creates safer place for pedestrians at night
• More pleasant atmosphere created for nighttime activities downtown
10 11 12
121810
PLANTINGS
122 811
Tree Planting Palette
In the City of Banning, the hot season lasts for three months from June to September with an average high temperature of 94°F. Exposure to full sunlight during these months due to sparse cloud cover could make it feel as hot as 109°F. Trees are a great solution to provide shade and reduce the heat island effect while also adding greenery to the city and habitat for wildlife. This is a recommended selection of trees that do well in hot climates for typical planting within the City of Banning.
Mulga (Acacia anerua)
Height: 20’-30’ Width: 20’-30’
Heat Tolerance: 94°F
Rosewood (Dalbergia sissoo)
Height: 60’ Width: 20’-30’
Heat Tolerance: 94°F
Fern Pine (Afrocarpus gracilor)
Height: 15’-50’ Width: 6’-8’
Heat Tolerance: 112°F
Tecate Cypress (Hesperocyparis forbesii)
Height: 33’ Width: 25’
Heat Tolerance: 94°F
Hackberry Tree (Celtis reticulata)
Height: 30’-60’ Width: 10’-25’
Heat Tolerance: 94°F
Palo Blanco (Mariosousa
willardiana)
Height: 20’ Width: 10’
Heat Tolerance: 112°F
Ghost Gum (Corymbia papuana)
Height: 60’ Width: 40’
Heat Tolerance: 94°F
Texas Umbrella Tree (Melia azedarach
‘Umbraculiformia’)
Height: 20’-25’ Width: 20’-30’
Heat Tolerance: 104°F
123812
Fruitless Olive (Olea europaea ‘Wilsonii’)
Height: 30’ Width: 30’
Heat Tolerance: 112°F
Chilean Mesquite (Prosopsis chilensis)
Height: 50’ Width: 80’
Heat Tolerance: 112°F
Desert Museum Palo Verde (Parkinsonia x
‘Desert Museum’)
Height: 20’-30’ Width: 20’-25’
Heat Tolerance: 112°F
Engelmann Oak (Quercus engelmannii)
Height: 25’-40’ Width: 25’-40’
Heat Tolerance: 110°F
Mount Altas Pistache (Pistacia atlantica)
Height: 60’ Width: 60’
Heat Tolerance: 108°F
African Sumac (Rhus lancea)
Height: 25’ Width: 30’
Heat Tolerance: 112°F
Tipu tree (Tipuana tipu)
Height: 50’ Width: 50’
Heat Tolerance: 94°F
124 813
DEVELOPMENT OPPORTUNITY
& EXISTING CONDITIONS
ANALYSIS
125814
DEVELOPMENT OPPORTUNITY
& EXISTING CONDITIONS
ANALYSIS
B A N N I N G D O W N T O W N R E V I TA L I Z AT I O N
B A N N I N G , C A L I F O R N I A
Prepared for The Arroyo Group
October 13, 2023
815
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 2 Since 1967, RCLCO has been the “first call” for real estate developers, investors, the public sector, and non-real estate companies and organizations seeking strategic and tactical advice regarding property investment, planning, and development.
RCLCO leverages quantitative analytics and a strategic planning framework to provide end-to-end business planning and implementation solutions at an entity, portfolio, or project level. With the insights and experience gained over 50 years and thousands of projects–touching over $5B of real estate activity each year–RCLCO brings success to all product types across the United States and around the world.
Learn more about RCLCO at www.RCLCO.com.
ABOUT RCLCO
REPORT AUTHORS
Project Director:
Derek Wyatt, Managing Director
► P: (310) 203-3035 | E: [email protected]
Project Manager:
Jordan LaMarche, Vice President
► P: (310) 752-9032 | E: [email protected]
Additional Authors:
Tyler Fischer, Associate
816
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 3
BACKGROUND & OBJECTIVES
BACKGROUND & OBJECTIVES
The Arroyo Group (“Client”) was retained by the City of Banning for the purpose of advising on the Banning Downtown Revitalization project. RCLCO has been commissioned as a sub-consultant by Arroyo Group to complete an existing conditions analysis for the commercial and retail spaces in Downtown Banning as well as outlining demographic and economic conditions of Banning and surrounding areas. To this end, RCLCO will evaluate the synergy between existing land uses in Downtown Banning and potential new developments by outlining three alternative downtown revitalization strategies.
RCLCO is providing initial findings relevant to the existing conditions of the Downtown Banning, the City of Banning, as well as an analysis of broader market trends. This component of the study focuses specifically on population, demographic, and social characteristics, economic conditions and factors, and local business conditions.
Specific analytical objectives of this effort included:
► Site Assessment: Evaluate the location qualities of the site, particularly access and visibility, quality of surrounding development, and visitation of existing businesses. ► Regional Economic Analysis: Identify and evaluate key geographic regions for comparison of demographic and economic variables. Provide an overview of commuter patterns for existing residents and key employment statistics for the City of Banning
Map of Downtown Banning
817
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 4
DEVELOPMENT OPPORTUNITY &
STRATEGY
818
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 5
DOWNTOWN BANNING ABSORPTION
POTENTIAL
Note: Assumes a stabilized occupancy rate of 95% for apartments. Assumes first development could be delivered in 2027.
Source: American Community Survey (US Census); Esri; Moody’s; CoStar; RCLCO
BASED ON HOUSEHOLD GROWTH PATTERNS AND INCREASING POTENTIAL CAPTURE OF LOCAL AND REGIONAL ACTIVITY, DOWNTOWN BANNING COULD SUPPORT NEARLY 400 NET NEW RESIDENTIAL UNITS OVER THE NEXT 10+ YEARS ► Concentration of rental apartment products, comprising 305 units (77% of total units), with for-sale product types comprising 90 units (23%) » The analysis considers the complete potential of Downtown Banning’s ability to continue capturing an increasing share of housing activity throughout the region.
Cumulative Residential Development Potential
31 61
92 122
153
183
214
244
275
305
9 18
27 36
45 54
63 72
81 90
0 50
100
150
200
250
300
350
400
450
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Cumulative Units Delivered
Rental For-Sale
819
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 6
POTENTIAL RETAIL CONDITIONS
Source: CoStar; Esri; City of Banning; RCLCO
INCREASING NEW DEVELOPMENT FOR RESIDENTIAL AND HOTEL USES IN DOWNTOWN WOULD INCREASE THE DEMAND BASE
FOR COMMERCIAL SPACE, HOWEVER DOWNTOWN WILL STILL NEED TO COMPETE WITH OTHER LOCAL AND REGIONAL
DESTINATIONS
► The increased residential density and new potential hotel rooms in Downtown Banning would generate approximately 40,000 square feet of demand for new retail space.
However, not all of that demand is likely to be captured in Downtown itself. In fact, it is likely that a meaningful portion of this new demand would flow to existing retail offerings, but the revitalization of Downtown should attempt to capture as many of those dollars as possible. ► The real opportunity for increased retail activity is to increase Downtown Banning’s share of existing and growing retail demand throughout the larger competitive market area.
FULL BUILD OUT
Total Housing Units 1 395
CMA Average Household Income (2023$) $102,914
Occupancy Rate 2 96%
Percent Spent on Retail 3 30%
Total Annual Retail Spending $11,724,477
Sales Per Square Feet 4 $450
Potential Demand From New Downtown Residents 26,054
Total Hotel Rooms 5 120
Guests Per Room 6 1.2
Occupancy Rate 7 70%
Visitor Retail Spending 8 $170
Total Annual Retail Spending $6,254,640
Sales Per Square Feet 4 $450
Potential Demand From New Hotel Guests 13,899
Potential Demand for New Retail from New Uses 39,954
1 Per RCLCO assumptions.
2 Assumes stabilized occupancy of 95% for rental units and 100% for for-sale units. 3 Per BLS Consumer Expenditure Report
4 Per RCLCO assumptions.
5 Based on current plans for proposed hotel development 6 Per RCLCO assumptions.
7 Assumed Stabilized Occupancy
8 Based on visitor spending patterns in the Inland Empire 820
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 7
ADDITIONAL RETAIL OPPORTUNITY
Source: CoStar; Esri; Broker Interviews; RCLCO
CURRENTLY, DOWNTOWN BANNING IS ESTIMATED TO CAPTURE LESS THAN 0.5% OF TOTAL RETAIL SPENDING FROM HOUSEHOLDS IN THE LOCAL MARKET. BRANDING EFFORTS AND NEW DEVELOPMENT SHOULD ATTEMPT TO INCREASE THAT SHARE, WHICH WOULD SUPPORT AN EXPANSION OF THE RETAIL OFFERING IN DOWNTOWN. ► Based on current households in the market area, average household income, and percent of income spent on retail, the current annual retail spending in the CMA is about $1.7 Billion.
► Based on RCLCO’s analysis of retail spending in Downtown Banning (Slide 30), RLCCO has determined that retail sales in Downtown Banning are about $16.5 million per year.
Based on RCLCO’s SafeGraph data analysis, about 46% of retail spending in Downtown originates from the local market area. Therefore retail spending from the local market attests for about $7.6 million or a share of 0.4% of all household retail spending in the CMA. ► If Banning were to successfully increase it’s capture of local retail demand by a quarter of a percentage to a full percentage, as well as maintain a similar relationship between capture of local households and other sources of demand, the incremental demand for retail could range from 17,500 square feet to as high as 88,500 square feet. % SHARE INCREASE SALES/SQUARE FOOT
400 450 500
0.25% 22,172 19,708 17,737
0.50% 44,343 39,416 35,474
1.00% 88,686 78,832 70,949
% SHARE INCREASE SQUARE FOOTAGE INCREASE
400 450 500
0.25% 13.4% 11.9% 10.7%
0.50% 26.8% 23.8% 21.4%
1.00% 53.5% 47.6% 42.8%
FULL BUILD OUT
Total CMA Households $57,450
CMA Average Household Income (2023$) $102,914
Total Income $5,912,409,300
Percent Spent on Retail 30%
Total Annual Retail Spending $1,773,722,790
Current Downtown Retail Spending $16,658,320
Percent of Retail Spending that Originates from Local Market 46% Local Retail Spending $7,662,827
Total Downtown Banning Retail Spending as a Percentage of Total Spending 0.4%
821
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 8
DEVELOPMENT STRATEGIES
RECOGNIZING THE ECONOMIC REALITIES OF THE CITY, IT IS IMPORTANT TO IDENTIFY WAYS TO GENERATE INTEREST, ACTIVITY, AND INVESTMENT WITHOUT MEANINGFUL CAPITAL SPENDING. THIS COULD INCLUDE THE FOLLOWING:
► Awareness
» The City of Banning should actively promote and educate various groups, including but not limited to residents in Banning and neighboring cities, businesses, travelers along I-10, and developers, regarding what is happening and changing in Downtown Banning. » An important first step is a new branding and signage strategy that emphasizes what is happening in Downtown and also serves as an effective way-finding tool to provide direction regarding where to go and what to see.
» The branding and signage should also emphasize the new and unique programming that should begin to take place and grown in Downtown. This would help to solve the question of “what is there to do there” and begin to develop some traditions and interactive events that foster a sense of place and community in the revitalized Downtown.
Some examples include farmers markets, festivals, live music, etc. ► Incentives for Development
» One of the most desirable and important tools to incentivize development is certainty. Anything that mitigates the risk of a lengthy and expensive entitlement process gives developers confidence that a project can move forward more efficiently and be more economically viable. » In addition to streamlining the planning process, the city could consider public financing options. This could include things like tax sharing agreements (e.g., transient occupancy tax), Enhanced Infrastructure Financing District (EIFD), and a Business Improvement District (a public-private partnership that provides a special assessment that can be used for funding infrastructure and other improvements). The benefits of these options are that they do not require a significant capital outlay from the city and do not increase taxes for the rest of the residents and stakeholders of the city. Instead, these are ways for these specific developers, owners, and businesses to fund the improvements that support their projects without adding additional costs that impact its viability. ► Catalytic Project
» In addition to a commitment to provide incentives for development, identifying a catalytic project is an important first step in helping to build critical mass and momentum which can begin to stimulate economic growth, enhance the urban environment, and lay the groundwork for creating a more vibrant and sustainable downtown in Banning.
The city already has a site across from the Banning Civic Center and interested developer that is proposing a denser development than currently exists in Downtown. The City should view itself as a partner with this developer in finding ways to expedite the planning and development of this project, while also providing other incentives and concessions that allow for an economically viable project in the near-term. 822
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 9
EXISTING CONDITIONS ANALYSIS
823
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 10
GEOGRAPHY DEFINITIONS
Source: Esri
NEAR THE NORTHWESTERN EDGE OF RIVERSIDE COUNTY, THE CITY OF BANNING IS AN AGING COMMUNITY WITH LIMITED RECENT ECONOMIC DEVELOPMENT.
► The downtown area, spanning just over a half mile in length, is largely comprised of aging establishments and quick service restaurants and is characterized by high vacancy.
Future development in Downtown Banning should benefit from high visibility as the area is adjacent to Interstate 10.
KEY
Downtown Banning
KEY
San Gorgonio Pass Area (Competitive Market Area [CMA])
City of Banning
Map of Banning, Beaumont, and Surrounding Area
Map of Downtown Banning
824
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 11
SITE CONTEXT
Image Source: Esri, Google Images
STRENGTHS
► Visibility and Access: Located adjacent to major interstate freeway I-10, the Downtown Banning area is visible and accessible from a major freeway. Further, the site is easily accessible to residents of the San Gorgonio Pass Area as well as the eastern portion of San Bernardino.
OPPORTUNITIES
► Limited Multifamily Housing: Banning has not had the delivery of new multifamily rental product in over 20 years and currently only has 471 market-rate multifamily rental units across 12 properties. Given the mixed-use concept, the Banning Downtown Revitalization has the opportunity to potentially deliver low-density multifamily units or attached single-family housing that would provide synergies across the retail offerings. These land uses could utilize public land to offer additional affordable housing. ► Historic Fox Cineplex: This historic theater, constructed in 1928, has the potential to serve as a focal point of the Banning Downtown Revitalization. This redevelopment benefits from the presence of a charming landmark, which can be leveraged to create synergies with neighboring retail and dining options and drive increased traffic to the downtown Banning area.
► Rapidly Growing City: The City of Banning was the fastest-growing city in California in 2020 as it grew by 3.8%. The expansion of the city is set to continue with the ongoing development of the Atwell master-planned community by Tri Pointe Homes and the developer set to deliver over 4,000 new homes to Banning.
CHALLENGES
► Community Serving Retail: Retail establishments currently located in the Banning Downtown area are largely community and commuter serving. The majority of these business do not attract patronage from outside the immediate Banning, and those that do are likely capturing spending from commuters due largely to the site’s proximity to Interstate-10 (Jack in the Box, IHOP). The retail offerings at the site will likely need to be elevated and represent a broader array of shopping options to transform the site into a retail destination.
► Aging and Economically Challenged Suburb: Banning is classified as an economically challenged suburb, with lower home values and little to no population growth. The average household income in Banning in 2021 was just under $64,000, far below the average household income of $87,000 in the San Gorgonio Pass Area, and $96,000 in Riverside County. With lower incomes and an aging and elderly population, Downtown Banning needs to provide new opportunities to attract a younger, more affluent demographic to the area.
Fox Cineplex Map of Downtown Banning
825
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 12 THE INLAND EMPIRE EXPERIENCED LESS SEVERE JOB LOSS IN 2020 THAN THE NATION AS A WHOLE, DEMONSTRATED A STRONG RECOVERY IN 2021, AND IS PROJECTED TO CONTINUE TO OUTPACE THE COUNTRY OVER THE NEXT FIVE YEARS ► Between 2011 and 2019, the Inland Empire added over 400,000 jobs, translating to average annual job growth of 3.4% per year. In comparison, the country as a whole demonstrated average annual job growth of just 1.6% during this same period. ► The Inland Empire lost nearly 58,000 jobs in 2020 following the start of the COVID-19 pandemic, representing a 3.7% downturn in job growth compared to over 6% nationally.
Additionally, the Inland Empire enjoyed job growth of 4.9% in 2021 surpassing the national average of 2.8%. Further, the Inland Empire is projected to average job growth of
2.4% over the next five years versus just 1.4% nationally during the same period.
REGIONAL EMPLOYMENT GROWTH
Source: Moody’s Analytics; RCLCO
Historical and Projected Employment Growth, 1992-2026;
Inland Empire
-8%
-6%
-4%
-2%
0%
2%
4%
6%
8%
-100
-80
-60
-40
-20
0 20
40 60
80 100
Annual Growth Rate
Annual Growth (000s)
Historical Growth - Inland Empire Growth Rate - Inland Empire Growth Rate - National 826
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 13
INLAND EMPIRE EMPLOYMENT IS PROJECTED TO GROW BY
10.4% OVER THE NEXT DECADE WITH CONTINUED GROWTH
IN EDUCATION & HEALTH SERVICES AND PROFESSIONAL &
BUSINESS SERVICES SECTORS AND A RECOVERY IN
LEISURE & HOSPITALITY
► Trade, transportation, & utilities has been the primary employment sector in the Riverside MSA for more than two decades and is projected to remain well ahead of Education & health services, projected to total 497,000 and 308,000 jobs respectively in 2031.
► Education & health services surpassed government as the second largest employment sector in the Riverside MSA in 2020, and is projected to grow an additional 16.4% between 2022 and 2031.
► The recovery and continued growth of the leisure & hospitality sector is projected to account for over 80,000 jobs by 2031.
► The construction industry is projected to retract by approximately 14% over the next decade, representing a loss of over 14,000 jobs in the field.
REGIONAL EMPLOYMENT
Source: Moody’s Analytics, RCLCO
Historic Projected Employment by Industry, 1991-2031;
Inland Empire
Employment Growth and Distribution by Industry 2010-2031 Inland Empire
INDUSTRY
SHARE OF
GROWTH (2010-
2021)
FORECASTED
GROWTH (2022-
2031)
TOTAL
DISTRIBUTION
(2021)
Trade, Transp. & Utilities 64.2% 4.5% 41.4%
Edu. & Health Services 56.2% 16.4% 21.8%
Construction 82.8% -14.4% 11.8%
Prof. & Business Services 35.6% 14.1% 10.5%
Leisure & Hospitality 29.5% 35.4% 8.7%
Manufacturing 11.9% 1.0% 2.4%
Government 4.0% 7.5% 2.2%
Other Services 12.4% 24.6% 1.1%
Financial Activities 10.3% 8.8% 1.0%
Natural Resources 35.9% 17.2% 0.1%
Information -31.9% 5.6% -1.1%
TOTAL 36.3% 10.4% 100.0%
0 100
200
300
400
500
600
Total Employment (000s)
Trade, Transp. & Utilities
Edu. & Health Services
Government
Leisure & Hospitality
Prof. & Business Services
Manufacturing
Construction
Other Services
Financial Activities
Information
Natural Resources
827
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 14
IN DEPTH DEMOGRAPHICS
Source: Esri; RCLCO
BANNING IS AN ECONOMICALLY DISADVANTAGED CITY WITH A SIGNIFICANT PROPORTION OF HOUSEHOLDS (52.5%) EARNING LESS THAN $50,000 ANNUALLY AND HISTORICAL HOUSEHOLD GROWTH (0.2% BETWEEN 2010 AND 2021) MUCH LOWER THAN SURROUNDING COMMUNITIES (1.0%+)
Note: The Competitive Market Area above is the geography defined on page 16.
CHARACTERISTIC CITY OF BANNING SAN GORGONIO PASS AREA RIVERSIDE COUNTY CALIFORNIA
POPULATION
2000 23,913 92,065 1,545,387 33,871,648
2010 29,603 134,658 2,189,641 37,253,956
2021 30,352 155,491 2,454,022 39,476,705
2026 31,740 163,765 2,587,751 40,507,842
Growth Rate (2000-2010) 2.2% 3.9% 3.5% 1.0%
Growth Rate (2010-2021) 0.2% 1.3% 1.0% 0.5%
Growth Rate (2021-2026) 0.9% 1.0% 1.1% 0.5%
Per Capita Income (2021) $23,220 $30,811 $29,814 $38,272
HOUSEHOLDS
2000 8,791 34,107 506,218 11,502,870
2010 10,838 47,596 686,260 12,577,498
2021 11,037 54,861 763,728 13,283,432
2026 11,509 57,616 800,787 13,615,954
Growth Rate (2000-2010) 2.1% 3.4% 3.1% 0.9%
Growth Rate (2010-2021) 0.2% 1.3% 1.0% 0.5%
Growth Rate (2021-2026) 0.8% 1.0% 1.0% 0.5%
Average Household Size (2021) 2.75 2.83 3.21 2.97
Average Household Income (2021) $63,776 $87,217 $95,683 $113,468 HOUSEHOLDS AGE DISTRIBUTION (2021)
Under 35 14.4% 15.5% 19.3% 19.4%
35-54 22.5% 30.9% 35.3% 36.2%
Over 55 63.1% 53.6% 45.4% 44.4%
HOUSEHOLDS INCOME DISTRIBUTION (2021)
Under $50,000 52.5% 36.8% 33.5% 31.6%
$50,000-$99,999 29.9% 30.5% 31.3% 27.7%
Over $100,000 17.6% 32.7% 35.2% 40.6%
HOUSEHOLD RENTER PROPENSITY
Renter Propensity (2000) 28.4% 27.2% 31.1% 43.1%
Renter Propensity (2010) 31.6% 26.5% 32.6% 44.1%
Renter Propensity (2021) 32.9% 25.2% 32.0% 44.3%
Renter Propensity (2026) 31.7% 24.4% 31.6% 44.2%
Renter Propensity of Growth (2000-2010) 45.3% 24.7% 36.9% 54.5% Renter Propensity of Growth (2010-2021) 102.5% 16.4% 26.5% 47.8% Renter Propensity of Growth (2021-2026) 2.8% 8.4% 22.0% 42.1% Renter Growth Rate (2000-2010) 3.2% 3.1% 3.6% 1.1%
Renter Growth Rate (2010-2021) 0.5% 0.8% 0.8% 0.5%
Renter Growth Rate (2021-2026) 0.1% 0.3% 0.7% 0.5%
828
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 15 $63,776
$87,217
$95,683
$113,468
Banning City San Gorgonio Pass
Area
Riverside County California
2.1%
3.4%
3.1%
0.9%
0.2%
1.3%
1.0%
0.5%
0.8%
1.0%
1.0%
0.5%
Banning City San Gorgonio Pass Area Riverside County California 2000-2010 2010-2021 2021-2026
DEMOGRAPHIC OVERVIEW
Source: Esri; RCLCO
THE CITY OF BANNING HAS A GREATER RENTER PROPENSITY AND LOWER AVERAGE HOUSEHOLD INCOME THAN THE
BROADER SAN GORGONIO PASS AREA AND IS PROJECTED TO HAVE SLOWER HOUSEHOLD GROWTH OVER THE NEXT FIVE YEARS Tenure – Household Type (2021) Average Household Income (2021) Average Household Size (2021) Annual Household Growth Rate Note: The Banning-Beaumont and Surround Areas above is the geography defined on page 14.
67.1% 74.8% 68.0%
55.7%
32.9% 25.2% 32.0%
44.3%
Banning City San Gorgonio Pass
Area
Riverside County California
Rent
Own
2.75 2.83
3.21 2.97
Banning City San Gorgonio Pass
Area
Riverside County California
829
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 16
HOUSEHOLDS BY AGE
Source: Esri; RCLCO
BANNING HOUSEHOLDS SKEW OLDER, WITH 48.2% OF HOUSEHOLDS OVER THE AGE OF 65; COMPARED TO 35.7% IN THE SAN GORGONIO PASS AREA, AND 27.2% IN ALL OF RIVERSIDE COUNTY Household Distribution by Age (2021)
2.6%
11.8%
11.9%
10.6%
14.9%
20.0%
28.2%
2.2%
13.3%
16.4%
14.5%
17.9%
18.1%
17.6%
2.9%
16.4%
17.9%
17.5%
18.2%
15.1%
12.1%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
<25 25-34 35-44 45-54 55-64 65-74 75+
Banning City San Gorgonio Pass Area Riverside County
830
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 17 BANNING HAS A HIGH PROPORTION OF LOW-INCOME HOUSEHOLDS WITH 52.5% OF HOUSEHOLDS EARNING LESS THAN $50,000 AND 24.5% EARNING LESS THAN $25,000 ANNUALLY; COMPARED TO 36.8% AND 17.3% RESPECTIVELY IN THE SAN GORGONIO PASS AREA.
HOUSEHOLDS BY INCOME
Source: Esri; RCLCO
Household Distribution by Income (2021)
12.7%
11.8%
10.9%
17.1%
18.5%
11.4%
11.3%
3.8%
2.5%
9.7%
7.6%
8.2%
11.3%
17.2%
13.4%
19.2%
7.3%
6.1%
8.6%
7.2%
6.9%
10.8%
17.0%
14.3%
18.8%
7.9%
8.5%
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
<$15,000
$15,000-$24,999$25,000-$34,999$35,000-$49,999$50,000-$74,999$75,000-$99,999 $100,000-$149,999$150,000-$199,999
$200,000+
Banning City San Gorgonio Pass Area Riverside County
831
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 18
BANNING DEMOGRAPHIC DISTRIBUTION
Median Age by Census Tract
Banning, 2022
Household Growth by Census Tract,
Banning, 2010 - 2022
Median Household Income by Census Tract,
Banning, 2022
KEY
$150,000+
$100,000 - $124,999
$75,000 - $99,999
$50,000 - $74,999
Under $50,000
KEY
> 3%
2% - 3%
1% - 2%
0% - 1%
< 0%
Source: Esri; RCLCO
HOUSEHOLD GROWTH IN BANNING HAS BEEN LIMITED OVER THE LAST DECADE AS THE CITY IS AN AGING COMMUNITY, THE MAJORITY OF RESIDENTS ARE OVER THE AGE OF 55, SKEWING MUCH OLDER THAN SURROUNDING AREAS. BANNING HAS A HIGH PROPORTION OF HOUSEHOLDS EARNING LESS THAN $75,000 THOUGH CENSUS TRACTS IN NEARBY COMMUNITIES ARE MORE AFFLUENT.
KEY
65 and Over
55 – 64
45 – 54
35 – 44
Under 35
832
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 19
NEIGHBORHOOD ATLAS
U
R
B
A
N
ECONOMIC CENTER:
Significant concentrations of employment and often the historic urban cores of cities
EMERGING ECONOMIC CENTER:
Well-located but underutilized locations; rapidly densifying from single-family/low- density to new mixed-use cores
MIXED-USE DISTRICT:
Situated near major employment cores, tend to be residentially focused, typically with high-density housing and upscale retail HIGH-END NEIGHBORHOOD:
Low-density and high-value single-family housing
STABLE NEIGHBORHOOD:
Historically working-class with diverse housing types, though many are gentrifying
CHALLENGED NEIGHBORHOOD:
Predominately residential with significantly lower home values and rents, along with high vacancy and unemployment rates S
U
B
U
R
B
A
N
ESTABLISHED HIGH-END:
High home values and established development patterns
STABLE MIDDLE-INCOME:
Wide variety of home values that are attainable to a range of households
ECONOMICALLY CHALLENGED:
Lower home values and have seen little to no population growth in recent years
GREENFIELD LIFESTYLE:
Bulk of new development at suburban fringe, often near established high-end suburbs
GREENFIELD VALUE:
At suburban fringe, often adjacent to stable or economically RCLCO Advisory: The Updated Neighborhood Atlas: A Roadmap to Growth Patterns in the Last Decade challenged areas or near low-wage job concentrations Downtown Banning
BANNING PRIMARILY CONSISTS OF GREENFIELD VALUE SUBURBS, THOUGH DOWNTOWN BANNING IS CHARACTERIZED AS AN
ECONOMICALLY CHALLENGED SUBURB CONSISTING OF LOWER VALUE HOMES WITH LIMITED RECENT POPULATION GROWTH Neighborhood Atlas Map;
Diamond Bar and surrounding neighborhoods - 2020
833
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 20 THE MAJORITY (88%) OF BANNING RESIDENTS WORK OUTSIDE OF THE CITY, WITH A SIGNIFICANT PORTION (55.4%) COMMUTING GREATER THAN 25 MILES TO WORK. HIGHER-DENSITY BUSINESS CORES ALONG INTERSTATE-10, SAN
BERNARDINO, RIVERSIDE, AND PALM SPRINGS ARE KEY EMPLOYMENT CENTERS FOR BANNING RESIDENTS
BANNING LIVE/WORK TRENDS
INFLOW/OUTFLOW JOB COUNTS COUNT SHARE
Employed in the Selection Area 5,466 100%
Employed in the Selection Area but Living Outside 4,025 73.6% Employed and Living in the Selection Area 1,441 26.4%
Living in the Selection Area 12,277 100%
Living in the Selection Area but Employed Outside 10,836 88.3% Living and Employed in the Selection Area 1,441 11.7%
Work Patterns, 2019
Banning
Employment Locations of Residents, 2019
Banning and Surrounding Southern California
COMMUTE DISTANCE OF BANNING RESIDENTS COUNT SHARE
TOTAL PRIMARY JOBS 12,277 100%
Less than 10 miles 3,160 25.7%
10 to 24 miles 2,317 18.9%
25 to 50 miles 3,055 24.9%
Greater than 50 miles 3,745 30.5%
Downtown Banning Source: Census on the Map; Esri; RCLCO 10 Miles
25 Miles
50 Miles
MAP KEY
Jobs/Sq. Mile
202 – 392
86 – 201
27 – 85
5 – 26
1 – 4
834
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 21
EMPLOYMENT IN BANNING IS CONCENTRATED ALONG
RAMSEY STREET WHICH RUNS ADJACENT TO INTERSTATE-10
► The majority of employees commute into Banning, with only 1,440 Banning residents working within the city. Majority of workers are between the ages of 30 and 54 (52%) and are heavily concentrated in the healthcare and education industry (44%). ► Employment in Banning is broadly distributed market with a few major large employers, primarily in the public sector. The largest employers in Banning are the Banning Unified School District (570 employees), the San Gorgonio Memorial Hospital (375 employees), the Smith Correctional Facility (137 employees), and the Banning Justice Center, a part of the Superior Court of California (approximately 70 employees).
► Greater than 88% of residents of Banning commute outside of the city for work and nearly 75% of the employees of Banning reside outside of the city.
BANNING LIVE/WORK TRENDS
PRIMARY JOBS COUNT SHARE
Employed in the Selection Area 5,466 100%
Worker Age
Age 29 or younger 1,198 21.9%
Age 30 to 54 2,844 52.0%
Age 55 or older 1,424 26.1%
Heat Map of Banning Employment, 2019
Source: City of Banning; Riverside County; Census on the Map; Esri; RCLCO Employment by Sector, 2019
Banning
MAP KEY
Jobs/Sq. Mile
339 – 824
108 – 338
23 – 107
3 – 22
1 – 2
Downtown Banning
14%
29%
8%
44%
4%
Manufacturing and
Logistics
Retail, Hospitality, and
Other Services
Professional Services
Healthcare and Education
Government
835
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 22
BANNING EMPLOYMENT COMPARISON
Source: Census on the Map; RCLCO
HIGH CONCENTRATION OF MANUFACTURING AND LOGISTICS EMPLOYEES LIVE IN BANNING AND ARE LIKELY COMMUTING OUT OF THE CITY FOR WORK.
EMPLOYED IN BANNING % OF TOTAL RESIDENTS OF BANNING % OF TOTAL Manufacturing and Logistics 791 14% 3,082 25%
Retail, Hospitality, and Other Services 1,588 29% 3,661 30% Professional Services 438 8% 1,767 14%
Healthcare and Education 2,407 44% 3,116 25%
Government 242 4% 651 5%
TOTAL 5,466 100% 12,277 100%
14%
29%
8%
44%
4%
Manufacturing and
Logistics
Retail, Hospitality, and
Other Services
Professional Services
Healthcare and Education
Government
Employed in Banning by Employment Sector
2019
25%
30% 14%
25%
5%
Manufacturing and
Logistics
Retail, Hospitality, and
Other Services
Professional Services
Healthcare and Education
Government
Residents of Banning by Employment Sector
2019
836
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 23
EMPLOYMENT IN BANNING IS CHARACTERISTICALLY DISTRIBUTED ACROSS SMALLER RETAIL AND PROFESSIONAL SERVICES
EMPLOYERS, WITH A NUMBER OF LARGER PUBLIC EMPLOYERS IN THE GOVERNMENT AND HEALTHCARE AND EDUCATION SECTORS.
EMPLOYMENT IN BANNING
Source: US Census; RCLCO, Inspired by Employment in America, 2014 – Robert Manduca
KEY JOB CATEGORIES
MANUFACTURING AND LOGISTICS
PROFESSIONAL SERVICES
HEALTHCARE AND EDUCATION
RETAIL, HOSPITALITY, AND OTHER SERVICES
GOVERNMENT
Downtown Banning
Employment by Sector, 2019;
Banning and Surrounding San Gorgonio Pass Area
837
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 24
SUBMARKET OVERVIEW
Source: CoStar; Esri; RCLCO
BANNING HAS NOT EXPERIENCED NEW APARTMENT DEVELOPMENT IN OVER 30 YEARS AND DESPITE LIMITED INVENTORY
HAS HIGHER LEVELS OF VACANCY THAN THE SURROUNDING SAN GORGONIO PASS AREA, LIKELY DRIVEN BY THE VINTAGE (OLDER AGE) OF SUPPLY OF AVAILABLE UNITS IN BANNING
BANNING
SAN
GORGONIO
PASS AREA
INLAND
EMPIRE
CURRENT CHARACTERISTICS (2022 YTD)
Properties 12 35 1,429
Units 471 1,986 157,057
Avg. Effective Rent $1,372 $1,360 $2,018
Vacancy 8.1% 3.6% 3.1%
SHORT-TERM TRENDS (2017-2021)
Avg. Rent Growth 5.8% 6.0% 7.6%
Avg. Vacancy 8.3% 4.3% 3.9%
Avg. Net Absorption 1 7 2,126
Avg. Completions 0 0 1,593
LONG-TERM TRENDS (2007-2021)
Avg. Rent Growth 2.7% 2.3% 3.6%
Avg. Vacancy 8.6% 5.9% 5.4%
Avg. Net Absorption 0 7 1806
Avg. Completions 0 3 1491
Map of San Gorgonio Pass Area and Banning
838
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 25 WITH NO NEW INVENTORY THE APARTMENT MARKET IN BANNING IS RELATIVELY STAGNANT. HOWEVER, BANNING EXPERIENCED SIZEABLE RENT GROWTH OF 10.5% IN 2021 DESPITE VACANCY REMAINING LARGELY UNCHANGED ► Most apartment markets experienced significant rent growth in 2021 due to increased demand as employment markets began to recover from the impacts of the Covid-19 pandemic lockdowns.
► The pandemic also catalyzed outward migration from larger urban areas towards the Coachella Valley and the Inland Empire. The influx of new renters further pressured the rental market which may have had a spillover effect on rents in Banning. ► The historically large rent growth of 2021 is amplified by the limited inventory within the City of Banning with an inventory of fewer than 500 total apartments. With vacancy steady around 8%, and no absorption (positive or negative) in 2021, increased rents are likely a result of the small sample size and heavy influence from nearby markets.
RENTAL APARTMENT MARKET
Source: CoStar; RCLCO
-10.0%
-5.0%
0.0%
5.0%
10.0%
15.0%
-20
-15
-10
-5
0 5
10 15
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 YTD
Vacancy / Rent Growth
Units
Change in Inventory Net Absorption Vacancy Effective Rent Growth Completions, Absorptions, Vacancy, and Rent Growth
Banning; 2007 – 2022 YTD
839
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 26 THE SAN GORGONIO PASS AREA LAST SAW NEW DEVELOPMENT IN 2008 AND FOLLOWING A SHORT-LIVED INCREASE IN VACANCY HAS EXPERIENCED DECLINING VACANCY NEARLY EVERY YEAR SINCE 2009. RENT GROWTH OF 8.9% IN 2021 WAS A NEAR RECORD-HIGH FOR THE AREA, EXCEEDED ONLY BY 9.3% RENT GROWTH IN 2017
RENTAL APARTMENT MARKET
Source: CoStar; RCLCO
Completions, Absorptions, Vacancy, and Rent Growth
San Gorgonio Pass Area; 2007 – 2022 YTD
-8.0%
-6.0%
-4.0%
-2.0%
0.0%
2.0%
4.0%
6.0%
8.0%
10.0%
12.0%
-20
-10
0 10
20 30
40 50
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 YTD
Vacancy / Rent Growth
Units
Change in Inventory Net Absorption Vacancy Effective Rent Growth 840
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 27
BUILDING PERMITS
Source: U.S. Department of Housing and Urban Development; RCLCO
NEW DEVELOPMENT IN BANNING DROPPED OFF
PRECIPITOUSLY AFTER 2003, BUT IN 2020 SURGED AND IS
AGAIN GROWING A PROPORTION OF DEVELOPMENT IN THE
SAN GORGONIO PASS AREA
► After declining from the late 1990s until the early 2000s, building permits rapidly declined in the in Banning beginning in 2003, and in the San Gorgonio Pass Area a few years later in 2005.
► While the number of units from building permits in the San Gorgonio Pass Area have not yet reached pre-financial crisis levels, permits in Banning in 2020 were the highest since 2003. As a proportion of the broader area, permits in Banning exceeded 40% for the first time since 1997.
► Since 1996 Banning has permitted only 171 multifamily units, which occurred between 2002 and 2005. Despite Banning beginning to permit a greater number of single-family units in 2020, there has been a significant absence of multi-family units being permitted over the past few decades.
Residential Building Permits Comparison;
San Gorgonio Pass Area and Banning; 1990 - 2021
Building Permits by Year;
Banning; 1981-2021
60% 63%
44%
53%
33%
37%
31%
15%
3% 1% 0% 1%
43%
27%
0%
10%
20%
30%
40%
50%
60%
70%
0 500
1000
1500
2000
2500
3000
3500
1990 1992 1994 1996 1998 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 Banning San Gorgonio Pass Area Banning as a Proportion of San Gorgonio Pass Area 0 100
200
300
400
500
600
700
1981 1986 1991 1996 2001 2006 2011 2016 2021
Units in Single-Family Structures Units in All Multi-Family Structures 841
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 28
NEW HOME DEVELOPMENTS
Source: Tri Pointe Homes; New Home Source
A BOOM IN NEW HOUSING CONSTRUCTION IN BANNING WILL LIKELY
ATTRACT RELATIVELY HIGHER EARNING HOUSEHOLDS
The median home value in Banning as of 2021 was just under $310,000 compared to roughly $369,000 in the San Gorgonio Pass Area and nearly $434,000 for Riverside County. ► The Atwell master-planned community by Tri Pointe Homes began selling new homes in Banning in 2020 and at build out is planned to provide over 4,400 new homes in the city. The developer currently has three actively selling communities in Banning; Landmark, Horizon, and Arroyo. The Cienega and Centerstone communities have already sold out. » The Arroyo neighborhood offers three to five-bedroom homes ranging from nearly 1,800 square feet to just under 2,300 square feet with three to five bedrooms and a two-car garage. Pricing for Arroyo ranges from $478,000 to $490,000. » The homes in the Landmark community range in size from 2,140 square feet to 2,625 square feet and offer three to four bedrooms with a two-car garage and are priced between $498,000 and $526,000.
» Horizon provides larger homes, ranging from 2,430 square feet to nearly 3,300 square feet with four or five bedrooms and a three-car garage. These homes are priced from $533,000 to over $590,000.
► The population of Banning could increase by roughly 12,000 people with the introduction of these new homes (4,400 homes at an average household size of 2.75). This would represent a 40% population increase over the current population of 30,000 and would account for 29% of city’s the population at build out.
» Given the expected positioning of these communities, the growth is likely to be concentrated among young families moving to the area in search of new, quality housing in a master-planned setting.
» This tremendous increase of new households will likely generate substantial retail demand as demographics shift younger and more affluent.
Land Use Plan for the Atwell Master-Planned Community
842
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 29
THE CITY OF BANNING HAS HAD LIMITED RETAIL DELIVERIES OVER THE PAST DECADE WHICH COMBINE FOR JUST OVER 41,000 SQUARE FEET OF NEW RETAIL SPACE
► There was significant negative net absorption of over 70,000 square feet in 2019 leading to increased vacancy of 11% in Banning. ► Despite the effects of the Covid-19 pandemic on brick-and-mortar retail, Banning has enjoyed positive net absorption each year since 2020 resulting in retail vacancy of just 6%.
RETAIL MARKET
Source: CoStar; RCLCO
Completions, Absorptions, Vacancy, and Rent Growth
Banning; 2006 – 2022 YTD
-15%
-10%
-5%
0%
5%
10%
15%
-100,000
-80,000
-60,000
-40,000
-20,000
0 20,000
40,000
60,000
80,000
100,000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 YTD
Vacancy Rate
SF Delivered / Absorbed
Deliveries, SF Net Absorption, SF Vacancy Rate
843
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 30
EXISTING RETAIL VISITORS
Source: SafeGraph, ArcGis, RCLCO
ALMOST HALF OF ALL TRAFFIC TO EXISTING DOWNTOWN
BANNING ESTABLISHMENTS ORIGINATES FROM WITHIN
BANNING
The retail visitor analyses were performed utilizing data from SafeGraph which provides a sample of cell phone data for over 18 million places of interest (POIs) where the cell phone was located for at least four minutes. ► The graph below shows that the most visited locations within Downtown Banning are Jack in the Box (22%), Vape Town (10%), IHOP (9%), and Wing’s Garden Cafe (8%). Collectively, these four establishments are driving nearly half (49%) of all traffic in the Downtown Banning area.
► The graph to the right displays the home location of visitors to the Downtown Banning area. For the most part these visitors stem from the immediate Banning area and parts of nearby Cabazon, Cherry Valley, Beaumont and the outlying communities of the San Gorgonio Pass Area.
► Despite being immediately adjacent to Interstate-10, the census block groups that comprise Banning, and those immediately bordering the city, account for approximately 46% of all visitors to the Downtown Banning area.
ESTIMATED VISITS PERCENTAGE
>84% of the Block Group
<4% of the Block Group
Map of Estimated Visit Percentage by Retailer - 2022
Map of Downtown Banning Visitors by Origin (Block Group of Residence) - 2022 Downtown Banning
ESTIMATED VISITS PERCENTAGE
>22% of Banning Downtown Traffic
≤1% of Banning Downtown Traffic
844
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 31 12%
25%
1%
16%
4%
10%
15%
11%
2%
2%
General Merchandise Local Restaurant Service w/ Retail Component Fast Casual Grocery Theaters
Auto Parts Fast Food Clothing & Accessory Stores
Liquor Store
EXISTING RETAIL CONDITIONS
EXISTING RETAIL IN THE CITY OF BANNING IS LARGELY
CONCENTRATED IN SERVICES
Service oriented businesses account for approximately 24% of retail space in the current Downtown Banning area. However, despite playing a vital role in the community, these businesses do not contribute to the city’s taxable revenue. ► Local restaurants, which occupy only 7% of all retail space in Downtown Banning with six restaurants, account for 25% of the taxable revenue in the area. ► The Parts Authority, an auto parts store, also generates a significant 15% of total taxable revenue while occupying 5% of the retail space in Downtown Banning. ► Retail space in Downtown Banning is currently 69% occupied, with 15 vacant spaces comprising 50,700 square feet.
DOWNTOWN BANNING
# OF RETAIL
SPACES RETAIL SALES TAXABLE SALES % TAXABLE SALES $
% OF ALL TAXABLE
REVENUE SQUARE FEET
RETAIL SALES
/ SF
General Merchandise 3 $1,441,500 100% $1,441,500 12% 3,100 $465 Local Restaurant 6 $3,071,750 100% $3,071,750 25% 12,287 $250 Service 19 $0 0% $0 0% 39,412 $0
Service w/ Retail Component 5 $3,135,060 5% $156,753 1% 17,417 $180 Fast Casual 2 $1,945,320 100% $1,945,320 16% 4,472 $435 Grocery 2 $2,153,110 25% $538,278 4% 3,098 $695
Theaters 1 $1,245,780 100% $1,245,780 10% 9,228 $135
Auto Parts 1 $1,768,800 100% $1,768,800 15% 8,040 $220
Fast Food 1 $1,377,500 100% $1,377,500 11% 2,755 $500
Clothing & Accessory Stores 1 $269,500 100% $269,500 2% 700 $385 Community Space 4 $0 N/A $0 0% 13,491 N/A
Liquor Store 1 $250,000 100% $250,000 2% 1,000 $250
Vacant 15 $0 N/A $0 0% 50,722 N/A
TOTAL 61 $16,658,320 72% $12,065,181 100% 165,722 $101
Distribution of Taxable Retail Sales by Business Type; Downtown Banning Source: CoStar; RCLCO
845
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 32
EXISTING RETAIL CONDITIONS
Source: CoStar; Esri; Broker Interviews; RCLCO
Property Address Anchor Tenant Occupied SF $/SF Avg.
12 S San Gorgonio Ave Law Offices of Thomas Watkins 4,047 $21.00 NNN 60 W Ramsey St Fox Cineplex Theatre 9,228 $14.25 MG
74 W Ramsey St Angel's Black Tiger 3,304 $14.25 MG
42 W Ramsey St Banning Center for the Arts 10,266 $30.36 MG 33 S San Gorgonio Ave Brow Rebellion 1,779 $17.50 NNN (Est.) 99 S San Gorgonio Ave Lithopass Printing Forms 2,138 $17.00 NNN (Est.) 70 S 1st St American Legion 1,771 $16.50 NNN (Est.)
50 S 1st St C's Beauty & Barber 2,000 $15.38 NNN (Est.) 144 W Ramsey St Vacant 0 $17.50 NNN (Est.)
116 W Ramsey St Wing's Garden Café 3,026 $16.50 NNN (Est.) 166 W Ramsey St Vacant 0 $15.50 NNN (Est.)
170 W Ramsey St Safe Plating Inc. 2,400 $17.00 NNN (Est.) 182 W Ramsey St An Elegant Affair Wedding Caterer 10,000 $19.00 NNN (Est.) 240 W Ramsey St Boys & Girls Clubs of America 6,912 $16.50 NNN (Est.) 51-57 S 2nd St Tenax Cleaners 2,399 $11.16 MG
65 S 2nd St Vacant 0 $12.00 NNN (Est.)
376 W Ramsey St Banning Smog Test Center 3,613 $15.50 NNN (Est.) 557 W Livingston St Vacant 0 $15.50 NNN (Est.)
572-584 W Ramsey St Banning Donut 2,300 $14.50 NNN (Est.) 770 W Ramsey St Jack in the Box 2,755 $15.50 NNN (Est.) 660 W Ramsey St Floral Expressions 5,064 $16.00 NNN (Est.) 730 W Ramsey St IHOP 4,022 $15.50 NNN (Est.)
53 S 6th St HELP Inc 4,308 $17.00 NNN (Est.)
614 W Ramsey St Vacant 0 $17.50 NNN (Est.)
755 W Ramsey St Santiago's Taco Shop 1,584 $15.50 NNN (Est.) 583 W Ramsey St Vacant 0 $15.50 NNN (Est.)
62 N 8th St Jack's Market 2,398 $15.50 NNN (Est.)
663 W Ramsey St Vacant 0 $17.00 NNN (Est.)
647 W Ramsey St Music & Voice Institute 1,631 $17.50 NNN (Est.) 603 W Ramsey St Vacant 0 $22.00 NNN (Est.)
575 W Ramsey St Papaya Bay Thai Cuisine 1,933 $17.50 NNN (Est.) 553 W Ramsey St Reynaldo's Restaurant 1,227 $18.00 NNN (Est.) 515-521 W Ramsey St Vacant 0 $13.68 +UTIL
41 W Ramsey St The Station Tap House Bar and Grill 2,717 $15.50 NNN (Est.) 30-40 S 1st St Janeth Beauty Salon 4,888 $11.40 MG
55-61 W Ramsey St Vacant 0 $15.50 NNN (Est.)
50 N 1st St Good Guys Flooring 6,400 $12.00 NNN
64-66 N 1st St Vacant 0 $13.50 NNN (Est.)
89 N San Gorgonio Ave La Carreta Dulceria 2,850 $16.50 NNN (Est.) 263 W Ramsey St Vacant 0 $16.50 NNN
321 W Ramsey St Parts Authority 8,040 $14.50 NNN (Est.) 66 S San Gorgonio Ave Vacant 0 $18.00 NNN (Est.)
TOTAL/AVG. 115,000 $16.42
RETAIL BUILDINGS IN DOWNTOWN BANNING ARE
SIGNIFICANTLY OLDER THAN IN NEARBY BEAUMONT.
RETAIL LEASES RANGE FROM $11 TO $21 PER SQUARE
FOOT
► Retail spaces in Banning were built, on average, in 1955 as opposed to Beaumont, where retail locations were built in 1988 on average. Retail occupancy in Downtown Banning is currently 69%.
► The newest spaces in Downtown Banning are the IHOP and Jack in the Box, which were constructed in 2002 and 2006. Aside from these two spaces, all locations in Downtown Banning were constructed before 1990. In relation, the City of Beaumont has had 20 new retail establishments constructed since 2010, 12 of which were built on or after 2020.
► According to several brokers and property owners in the Downtown Banning area, there has been a recent increase in interest in retail space in Banning as a value alternative to Beaumont. However, difficulty with leasing has stemmed from the age of the retail locations, prospective tenants requesting improvements to existing locations, and concerns regarding neighboring land uses.
Map of Downtown Banning Retail Locations by Size and Occupancy; 2022
RETAIL LOCATION SIZE
20,000 Square Feet
500 Square Feet
RETAIL LOCATION STATUS
Occupied
Vacant
846
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 33
DISCLAIMERS
847
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 34
CRITICAL ASSUMPTIONS
Our conclusions are based on our analysis of the information available from our own sources and from the client as of the date of this report. We assume that the information is correct, complete, and reliable.
We made certain assumptions about the future performance of the global, national, and local economy and real estate market, and on other factors similarly outside either our control or that of the client. We analyzed trends and the information available to us in drawing these conclusions. However, given the fluid and dynamic nature of the economy and real estate markets, as well as the uncertainty surrounding particularly the near-term future, it is critical to monitor the economy and markets continuously and to revisit the aforementioned conclusions periodically to ensure that they are reflective of changing market conditions.
We assume that the economy and real estate markets will experience a period of slower growth in the next 12 to 24 months, and then return to a stable and moderate rate in 2024 and beyond. However, stable and moderate growth patterns are historically not sustainable over extended periods of time, the economy is cyclical, and real estate markets are typically highly sensitive to business cycles. Further, it is very difficult to predict when inflection points in economic and real cycles will occur.
With the above in mind, we assume that the long-term average absorption rates and price changes will be as projected, realizing that most of the time performance will be either above or below said average rates.
Our analysis does not consider the potential impact of future economic shocks on the national and/or local economy, and does not consider the potential benefits from major "booms” that may occur. Similarly, the analysis does not reflect the residual impact on the real estate market and the competitive environment of such a shock or boom. Also, it is important to note that it is difficult to predict changing consumer and market psychology.
As such, we recommend the close monitoring of the economy and the marketplace, and updating this analysis as appropriate.
Further, the project and investment economics should be “stress tested” to ensure that potential fluctuations in revenue and cost assumptions resulting from alternative scenarios regarding the economy and real estate market conditions will not cause failure.
In addition, we assume that the following will occur in accordance with current expectations:
► Economic, employment, and household growth
► Other forecasts of trends and demographic and economic patterns, including consumer confidence levels ► The cost of development and construction
► Tax laws (i.e., property and income tax rates, deductibility of mortgage interest, and so forth) ► Availability and cost of capital and mortgage financing for real estate developers, owners and buyers ► Competitive projects will be developed as planned (active and future) and that a reasonable stream of supply offerings will satisfy real estate demand ► Major public works projects occur and are completed as planned Should any of the above change, this analysis should be updated, with the conclusions reviewed accordingly (and possibly revised). 848
Arroyo Group | Market Demand and Fiscal Impact Analysis | Banning Downtown Revitalization R1-15403.02 | October 13, 2023 | 35 Reasonable efforts have been made to ensure that the data contained in this study reflect accurate and timely information and are believed to be reliable. This study is based on estimates, assumptions, and other information developed by RCLCO from its independent research effort, general knowledge of the industry, and consultations with the client and its representatives. No responsibility is assumed for inaccuracies in reporting by the client, its agent, and representatives or in any other data source used in preparing or presenting this study. This report is based on information that to our knowledge was current as of the date of this report, and RCLCO has not undertaken any update of its research effort since such date.
Our report may contain prospective financial information, estimates, or opinions that represent our view of reasonable expectations at a particular time, but such information, estimates, or opinions are not offered as predictions or assurances that a particular level of income or profit will be achieved, that particular events will occur, or that a particular price will be offered or accepted. Actual results achieved during the period covered by our prospective financial analysis may vary from those described in our report, and the variations may be material. Therefore, no warranty or representation is made by RCLCO that any of the projected values or results contained in this study will be achieved.
Possession of this study does not carry with it the right of publication thereof or to use the name of "Robert Charles Lesser & Co." or "RCLCO" in any manner without first obtaining the prior written consent of RCLCO. No abstracting, excerpting, or summarization of this study may be made without first obtaining the prior written consent of RCLCO. This report is not to be used in conjunction with any public or private offering of securities or other similar purpose where it may be relied upon to any degree by any person other than the client without first obtaining the prior written consent of RCLCO. This study may not be used for any purpose other than that for which it is prepared or for which prior written consent has first been obtained from RCLCO.
GENERAL LIMITING CONDITIONS
849
A U S T I N
1 0 0 C o n g r e s s A v e n u e , S u i t e 2 0 0 0
A u s t i n , T X 7 8 7 0 1
L O S A N G E L E S
1 1 6 0 1 W i l s h i r e B o u l e v a r d , S u i t e 1 6 5 0 L o s A n g e l e s , C A 9 0 0 2 5
O R L A N D O
9 6 4 L a k e B a l d w i n L a n e , S u i t e 1 0 0
O r l a n d o , F L 3 2 8 1 4
WA S H I N G TO N , D C
7 2 0 0 W i s c o n s i n A v e n u e , S u i t e 1 1 1 0 B e t h e s d a , M D 2 0 8 1 4
850
851
10 E. Hays Street
Project Location Map
Martin Street
N. 8th Street
Ramsey Street
W. Livingston Street
0.25 Miles 852
CITY OF BANNING
STAFF REPORT
TO: CITY COUNCIL
FROM: Douglas Schulze, City Manager
PREPARED BY: Carla Young, Business Support Manager
Jim Steffens, Interim Electric Utility Director
MEETING DATE: January 9, 2024
SUBJECT: Consideration of Resolution 2024-06, Approval of Itron Software-as-aService Product RECOMMENDATION:
Adopt Resolution 2024-06 approving the annual maintenance Software as a Service agreement for the Itron agreement in the not-to-exceed amount of $39,630 per year for a total of two years.
BACKGROUND:
On September 12, 2023, City Council approved Resolution 2023-162 consolidating the Software as a Service (SAAS) products utilized citywide. At that time, there were some agreements that were previously approved under the original resolution for the project so it was not included in Resolution 2023-162. The Purchasing division, acting to facilitate the requirements of the Government Accounting Standards Board (GASB) reporting on software agreements, has determined that all SAAS maintenance should be approved annually and paid by a purchase order.
The Itron Master Services agreement, which includes the SAAS agreement, is an annual cost of $39,630. It will be included in future citywide annual approval requests moving forward.
JUSTIFICATION:
The software application and platform is a necessary tools utilized by Staff for continued AMI metering operations for the Electric Utility department. The software provides informational data and reporting enabling Staff and Council to manage the City of Banning Electric Utility.
FISCAL IMPACT:
Staff budgets for the software annually.
FY 2023/2024 $39,630
FY 2024/2025 $39,630
ALTERNATIVES:
1. Adopt Resolution 2024-06 as recommended.
2. Adopt Resolution 2024-06 with modifications.
3. Do not approve Resolution 2024-06 and direct staff to abandon the Itron metering system and seek alternate software and meters to manage metering needs for the Electric Utility.
ATTACHMENTS:
1. Resolution_2024-06__Itron.pdf
853
1. Exhibit A - 2024-06_Att 3_C00659_ITRON_INC_ Executed.pdf
2. 2024-06_Att 2_Resolution 2023-162.pdf
854
Resolution 2024-06