City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

CONTRACTOR’S CERTIFICATE REGARDING
WORKERS’ COMPENSATION
16 CONTRACTOR’S CERTIFICATE REGARDING
WORKERS’ COMPENSATION
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers’ compensation or to undertake self- insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this Contract.

Name of Bidder
Signature
Name and Title
Dated

Page 740 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

BID BOND
17 BID BOND
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

The makers of this bond are,

as Principal, and

, as Surety

and are held and firmly bound unto the City of Beaumont, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to CITY for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated __________________, 20____, for

CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

If the Principal does not withdraw its bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.

Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall in affect its obligation under this bond, and Surety does hereby waive notice of any such changes.

In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and expenses.

Page 741 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

BID BOND
18 IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this _______ day of ________________, 20____, the name and corporate seal of each corporation.

(Corporate Seal)
Principal

By
Title
(Corporate Seal) Surety
By
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title

Page 742 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

BID BOND
19 STATE OF CALIFORNIA )
) ss.

CITY OF ___________ )
On this ________ day of ___________________, in the year 20__, before me, ___________________________, a Notary Public in and for said state, personally appeared _________________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-In-Fact of the (Surety) acknowledged to me that he subscribed the name of the ___________________________ (Surety) thereto and his own name as Attorney-In- Fact.

___________________________
Notary Public in and for said State

(SEAL)

Commission expires: _______________

NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must be attached hereto.

Page 743 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

DESIGNATION OF SUBCONTRACTORS
20 DESIGNATION OF SUBCONTRACTORS
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

In compliance with the Subletting and Subcontracting Fair Practices Act of the Public Contract Code of the State of California, each bidder shall set forth below: (a) the name and the location of the place of business and (b) the portion of the work which will be done by each subcontractor who will perform work or labor or render service to the Contractor in excess of one-half of 1 percent of the prime contractor’s total bid or ten thousand dollars ($10,000), whichever is greater.

Portion of the Work Subcontractor Location of Business % of Work

Page 744 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

DESIGNATION OF SUBCONTRACTORS
21 Portion of the Work Subcontractor Location of Business % of Work

Name of Bidder
Signature
Name and Title
Dated

Page 745 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
22 INFORMATION REQUIRED OF BIDDERS
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

A. INFORMATION ABOUT BIDDER

[**Indicate not applicable (“N/A”) where appropriate.**]

NOTE: Where Bidder is a joint venture, pages shall be duplicated and information provided for all parties to the joint venture.

1.0 Name of Bidder: ___________________________________________

2.0 Type, if Entity: ___________________________________________

3.0 Bidder Address: ___________________________________________ _____________________________________________________________ _____________________________________________________________ _____________________________________________________________ Facsimile Number Telephone Number

4.0 License Information:
_____________________________________________________________ License No. Class of License Expiration Date
__________________
DIR Registration No.

5.0 How many years has Bidder’s organization been in business as a Contractor? ______________________________

6.0 How many years has Bidder’s organization been in business under its present name? ________________________

5.1 Under what other or former names has Bidder’s organization operated? _______________________________________________

Page 746 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
23 7.0 If Bidder’s organization is a corporation, answer the following:

7.1 Date of Incorporation: ________________________________

7.2 State of Incorporation: ________________________________

7.3 President’s Name: ________________________________

7.4 Vice-President’s Name(s): ________________________________

7.5 Secretary’s Name: ________________________________

7.6 Treasurer’s Name: ________________________________

8.0 If an individual or a partnership, answer the following:

8.1 Date of Organization:
______________________________________

8.2 Name and address of all partners (state whether general or limited partnership):
___________________________________________________________ ___________________________________________________________ ___________________________________________________________

9.0 If other than a corporation or partnership, describe organization and name principals: ___________________________________________________________ ___________________________________________________________

10.0 List other states in which Bidder’s organization is legally qualified to do business. ___________________________________________________________ ___________________________________________________________ ___________________________________________________________

Page 747 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
24 11.0 What type of work does the Bidder normally perform with its own forces? ___________________________________________________________ ___________________________________________________________

12.0 Has Bidder ever failed to complete any work awarded to it? If so, note when, where, and why:
___________________________________________________________ ___________________________________________________________

13.0 Within the last five years, has any officer or partner of Bidder’s organization ever been an officer or partner of another organization when it failed to complete a contract? If so, attach a separate sheet of explanation:
___________________________________________________________ ___________________________________________________________

14.0 List Trade References:
___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________

15.0 List Bank References (Bank and Branch Address):
___________________________________________________________ ___________________________________________________________ ___________________________________________________________ ___________________________________________________________

Page 748 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
25 16.0 Name of Bonding Company and Name and Address of Agent:
___________________________________________________________ ___________________________________________________________ ___________________________________________________________

Page 749 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
26 B. LIST OF CURRENT PROJECTS (Backlog)

[**Duplicate Page if needed for listing additional current projects.**]

Project Description of
Bidder’s Work
Completion
Date
Cost of
Bidder’s Work
Contact Name &
Phone

Page 750 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
27 C. LIST OF COMPLETED PROJECTS - LAST THREE YEARS

[**Duplicate Page if needed for listing additional completed projects.**]

Please include only those projects which are similar enough to demonstrate Bidder’s ability to perform the required Work.

Project Client Description of
Bidder’s Work
Period of
Performance
Cost of Bidder’s
Work
Contact Name
& Phone

Page 751 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
28 D. EXPERIENCE AND TECHNICAL QUALIFICATIONS QUESTIONNAIRE

Personnel:

The Bidder shall identify the key personnel to be assigned to this project in a management, construction supervision or engineering capacity.

1. List each person’s job title, name and percent of time to be allocated to this project:

________________________________________________________________

________________________________________________________________

________________________________________________________________

2. Summarize each person’s specialized education:

________________________________________________________________

________________________________________________________________

________________________________________________________________

3. List each person’s years of construction experience relevant to the project:

________________________________________________________________

________________________________________________________________

________________________________________________________________

4. Summarize such experience:

________________________________________________________________

________________________________________________________________

________________________________________________________________

Bidder agrees that personnel named in this Bid will remain on this Project until completion of all relevant Work, unless substituted by personnel of equivalent experience and qualifications approved in advance by the City.

Page 752 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

INFORMATION REQUIRED OF BIDDERS
29 Additional Bidder’s Statements:

If the Bidder feels that there is additional information which has not been included in the questionnaire above, and which would contribute to the qualification review, it may add that information in a statement here or on an attached sheet, appropriately marked:

________________________________________________________________

________________________________________________________________

________________________________________________________________

E. VERIFICATION AND EXECUTION

These Bid Forms shall be executed only by a duly authorized official of the Bidder:

I declare under penalty of perjury under the laws of the State of California that the foregoing information is true and correct:

Name of Bidder
Signature
Name and Title
Dated

Page 753 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

NON-COLLUSION AFFIDAVIT
30 NON-COLLUSION AFFIDAVIT
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

I,___________________________, being first duly sworn, deposes and says that he is of ______________________ the party making the attached bid; that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid.

I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

Name of Bidder
Signature
Name and Title
Dated

Page 754 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

31 PERFORMANCE BOND

KNOW ALL PERSONS BY THESE PRESENTS:

THAT WHEREAS, ___________________________ (hereinafter referred to as “City”) has awarded to ____________________, (hereinafter referred to as the “Contractor”) _______________________ an agreement for ________________________________ (hereinafter referred to as the “Project”).

WHEREAS, the work to be performed by the Contractor is more particularly set forth in the Contract Documents for the Project dated ________________, (hereinafter referred to as “Contract Documents”), the terms and conditions of which are expressly incorporated herein by reference; and
WHEREAS, the Contractor is required by said Contract Documents to perform the terms thereof and to furnish a bond for the faithful performance of said Contract Documents.

NOW, THEREFORE, we, _______________, the undersigned Contractor and _____________________________________________ as Surety, a corporation organized and duly authorized to transact business under the laws of the State of California, are held and firmly bound unto the City in the sum of ___________________________ DOLLARS, ($____________), said sum being not less than one hundred percent (100%) of the total amount of the Contract, for which amount well and truly to be made, we bind ourselves, our heirs, executors and administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that, if the Contractor, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the Contract Documents and any alteration thereof made as therein provided, on its part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their intent and meaning; and shall faithfully fulfill all obligations including the one-year guarantee of all materials and workmanship; and shall indemnify and save harmless the City, its officers and agents, as stipulated in said Contract Documents, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.

As a part of the obligation secured hereby and in addition to the face amount specified therefore, there shall be included costs and reasonable expenses and fees including reasonable attorney’s fees, incurred by City in enforcing such obligation.

As a condition precedent to the satisfactory completion of the Contract Documents, unless otherwise provided for in the Contract Documents, the above obligation shall hold good for a period of one (1) year after the acceptance of the work by City, during which

Page 755 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

32 time if Contractor shall fail to make full, complete, and satisfactory repair and replacements and totally protect the City from loss or damage resulting from or caused by defective materials or faulty workmanship. The obligations of Surety hereunder shall continue so long as any obligation of Contractor remains. Nothing herein shall limit the City’s rights or the Contractor or Surety’s obligations under the Contract, law or equity, including, but not limited to, California Code of Civil Procedure section 337.15.

Whenever Contractor shall be, and is declared by the City to be, in default under the Contract Documents, the Surety shall remedy the default pursuant to the Contract Documents, or shall promptly, at the City’s option:
(1) Take over and complete the Project in accordance with all terms and conditions in the Contract Documents; or
(2) Obtain a bid or bids for completing the Project in accordance with all terms and conditions in the Contract Documents and upon determination by Surety of the lowest responsive and responsible bidder, arrange for a Contract between such bidder, the Surety and the City, and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable. The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.
(3) Permit the City to complete the Project in any manner consistent with California law and make available as work progresses sufficient funds to pay the cost of completion of the Project, less the balance of the contract price, including other costs and damages for which Surety may be liable.

The term “balance of the contract price” as used in this paragraph shall mean the total amount payable to Contractor by the City under the Contract and any modification thereto, less any amount previously paid by the City to the Contractor and any other set offs pursuant to the Contract Documents.

Surety expressly agrees that the City may reject any contractor or subcontractor which may be proposed by Surety in fulfillment of its obligations in the event of default by the Contractor.

Surety shall not utilize Contractor in completing the Project nor shall Surety accept a bid from Contractor for completion of the Project if the CITY, when declaring the Contractor in default, notifies Surety of the City’s objection to Contractor’s further participation in the completion of the Project.

Page 756 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

33 The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project to be performed thereunder shall in any way affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract Documents or to the Project.
[Remainder of Page Left Intentionally Blank.]

Page 757 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

34 IN WITNESS WHEREOF, we have hereunto set our hands and seals this _______ day of ______________, 20__.

_________________________________________

CONTRACTOR/PRINCIPAL

_________________________________________
Name

By_______________________________________

SURETY:

By: ______________________________________
Attorney-In-Fact

The rate of premium on this bond is ____________ per thousand. The total amount of premium charges, $_______________________________.
(The above must be filled in by corporate attorney.)

THIS IS A REQUIRED FORM
Any claims under this bond may be addressed to:
(Name and Address of Surety) ___________________________________________ ___________________________________________
___________________________________________

(Name and Address of Agent or ___________________________________________ Representative for service of
process in California, if different ___________________________________________ from above)
___________________________________________
(Telephone number of Surety and ___________________________________________ Agent or Representative for service
of process in California

Page 758 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

35 STATE OF CALIFORNIA )
) ss.

CITY OF ___________ )
On this ________ day of ___________________, in the year 20__, before me, ___________________________, a Notary Public in and for said state, personally appeared _________________________________, known to me to be the person whose name is subscribed to the within instrument as the Attorney-In-Fact of the (Surety) acknowledged to me that he subscribed the name of the
___________________________ (Surety) thereto and his own name as Attorney-In- Fact.

Notary Public in and for said State
(SEAL)
Commission expires: _______________
NOTE: A copy of the Power-of-Attorney to local representatives of the bonding company must be attached hereto.

Page 759 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

36 PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS That

WHEREAS, the City of Beaumont (hereinafter designated as the “City”), by action taken or a resolution passed ___________ , 20__ has awarded to ________________ hereinafter designated as the “Principal,” a contract for the work described as follows:
______________________________________________________________________ ______ (the “Project”); and
WHEREAS, said Principal is required to furnish a bond in connection with said contract; providing that if said Principal or any of its Subcontractors shall fail to pay for any materials, provisions, provender, equipment, or other supplies used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Code or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of said Principal and its Subcontractors with respect to such work or labor the Surety on this bond will pay for the same to the extent hereinafter set forth.

NOW THEREFORE, we, the Principal and __________________________ as Surety, are held and firmly bound unto the City in the penal sum of ______________ Dollars ($___________) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his or its subcontractors, heirs, executors, administrators, successors or assigns, shall fail to pay any of the persons named in Section 3181 of the Civil Code, fail to pay for any materials, provisions or other supplies, used in, upon, for or about the performance of the work contracted to be done, or for any work or labor thereon of any kind, or amounts due under the Unemployment Insurance Code with respect to work or labor performed under the contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department or Franchise Tax Board from the wages of employees of the contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code, with respect to such work and labor the Surety or Sureties will pay for the same, in an amount not exceeding the sum herein above specified, and also, in case suit is brought upon this bond, all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and investigation expenses.

This bond shall inure to the benefit of any of the persons named in Section 3181 of the Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon this bond.

Page 760 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

37 It is further stipulated and agreed that the Surety on this bond shall not be exonerated or released from the obligation of this bond by any change, extension of time for performance, addition, alteration or modification in, to, or of any contract, plans, specifications, or agreement pertaining or relating to any scheme or work of improvement herein above described, or pertaining or relating to the furnishing of labor, materials, or equipment therefore, nor by any change or modification of any terms of payment or extension of the time for any payment pertaining or relating to any scheme or work of improvement herein above described, nor by any rescission or attempted rescission or attempted rescission of the contract, agreement or bond, nor by any conditions precedent or subsequent in the bond attempting to limit the right of recovery of claimants otherwise entitled to recover under any such contract or agreement or under the bond, nor by any fraud practiced by any person other than the claimant seeking to recover on the bond and that this bond be construed most strongly against the Surety and in favor of all persons for whose benefit such bond is given, and under no circumstances shall Surety be released from liability to those for whose benefit such bond has been given, by reason of any breach of contract between the owner or City and original contractor or on the part of any obligee named in such bond, but the sole conditions of recovery shall be that claimant is a person described in Section 3110 or 3112 of the Civil Code, and has not been paid the full amount of his claim and that Surety does hereby waive notice of any such change, extension of time, addition, alteration or modification herein mentioned.

IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for all purposes be deemed unoriginal thereof, have been duly executed by the Principal and Surety above named, on the _____ day of ______________________ 20______ the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing body.
(Corporate Seal of Principal, __________
if corporation) Principal (Property Name of Contractor) By
(Signature of Contractor)
(Seal of Surety)
Surety
By
Attorney in Fact
(Attached Attorney-In-Fact Certificate and Required Acknowledgements) *Note: Appropriate Notarial Acknowledgments of Execution by Contractor and +surety and a power of Attorney MUST BE ATTACHED.

Page 761 of 1492 ends

CIP WW-09 Beaumont Mesa Lift Station
Force Main Addendum No. 1- June 30, 2023

Addendum No. 1
Request for Clarifications (RFC) Questions

1. Do you have an Engineer’s Estimate for this project? City of Beaumont Response: The City does not provide engineer's estimates during bidding.

2. What is the engineer’s estimate for this project?
City of Beaumont Response: The City does not provide engineer's estimates during bidding.

3. Do you have an Engineer’s Estimate for the Beaumont Mesa Lift Station Force Main project that bids on 07/11/23?
City of Beaumont Response: The City does not provide engineer's estimates during bidding.

4. Item 32 Caltrans coordination will almost certainly require an encroachment permit, even just to have a road work ahead sign on the offramp would require one and we can’t know the permit costs until after submitting the application and traffic plan which will have to be engineered and after that they will calculate the costs of the permit. This item can't be accurately or fairly bid and should be changed to a preset allowance item or omitted entirely and the responsibility of cost placed on the city of Beaumont.

City of Beaumont Response: See Special Conditions SC-07 for the work and costs related to Caltrans permit and coordination.

5. Section GC07 section f states that the contractor has to bear the costs of review of substitutions of "or equal" items. Wouldn't that review process already take place during the submittal process and therefore warrant no extra charge to the contractor? City of Beaumont Response: Correct, there will be no extra charges or additional compensation for submittal reviews.

6. Section GC29 - Will all of these items be required? A field office with heating/AC fax machine, phone line, etc.

City of Beaumont Response: No Field Office is required, see Special Condition SC-19.

7. Section GC46 section c states "paid no later than sixty (35) Days.." Is it 60 days or 35 days? City of Beaumont Response: Payment shall be per the general conditions.

8. Section SC-12 Calls for piping, appurtenances, etc. removals and testing and flushing and all costs are supposed to be included but we don’t know what the existing lines condition is or the joints and if it will even withstand a hydrostatic test. Also you mention dechlorination.

Are there chlorination and Bac-T's required then? How can we bid all these unknowns accurately and fairly?
City of Beaumont Response: For bidding purposes, Contractor shall assume that the existing pipeline can be pressure tested as described in Appendix G of the specifications. De-chlorination is necessary due to the chlorine residual from the water source. Additional chlorination and Bac-T of the lines is not required.

Page 762 of 1492 ends

CIP WW-09 Beaumont Mesa Lift Station
Force Main Addendum No. 1- June 30, 2023

9. The run along Western Knolls gets close to the fence line. Do you anticipate removing portions of the fence along the freeway edge on Western Knolls?
City of Beaumont Response: The contractor should use shoring and other available methods in order to avoid having to remove and replace portions of the fence.

10. Plan sheet 3 of 18 calls out for a 2" Air Valve per detail on sheet 15. There are no details for a 2" Air Valve on sheet 15. Please Advise.

City of Beaumont Response: 2" Air Valve shall be provided with a cover per Detail 1 on Sheet 18, connection to force main shall be a 2-in saddle outlet with a corp stop and DI Pipe.

11. Section GC29 of the General Conditions specifies a field office trailer and amenities for the inspectors. Q1) Is there a site location earmarked for the trailer that currently has power? Q2) Will the inspectors trailer require an additional portable sanitary facility? City of Beaumont Response: No Field Office is required, see Special Condition SC-19.

Any questions regarding this should be sent to:

Grace Wichert
[email protected]

Dated: 06/30/2023

By:
(Bidder’s Company Name)

(Bidder’s Signature)
Date Received by Bidder:

(Bidders Printed Name)

Bidder shall include a signed copy of this Addendum No. 1 with the bid proposal.

END OF ADDENDUM NO. 1

Page 763 of 1492 ends

Access Report 6/30/2023
Agency City of Beaumont (CA)
Bid Number PW23-22 (CIP WW-09)
Bid Title Beaumont Mesa Lift Station Force Main
Vendor Name Accessed First Time Most Recent Access Documents School Wholesale Supplies LLC 2023-06-13 09:41 PM PDT 2023-06-13 09:41 PM PDT Construction Bid Source 2023-06-27 10:04 PM PDT 2023-06-27 10:07 PM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf
Kirtley Construction, Inc.2023-06-19 08:49 AM PDT 2023-06-19 02:07 PM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
02 General Conditions.pdf
Turnkey Solutions, LLC 2023-06-16 12:08 PM PDT 2023-06-16 12:08 PM PDT 02 General Conditions.pdf
Infrastructure Engineers 2023-06-15 08:37 AM PDT 2023-06-15 08:37 AM PDT MNR Construction Inc 2023-06-15 09:49 AM PDT 2023-06-15 09:49 AM PDT Ferreira Construction Co., Inc.2023-06-15 12:27 PM PDT 2023-06-15 12:32 PM PDT 02 General Conditions.pdf
03 Special Conditions.pdf
05 Contract Drawings.pdf
07 Appendices.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Ludwig Engineering 2023-06-27 04:27 PM PDT 2023-06-27 04:27 PM PDT MCC 2023-06-15 12:54 PM PDT 2023-06-19 05:51 AM PDT
02 General Conditions.pdf
03 Special Conditions.pdf
04 Technical Specifications.pdf
05 Contract Drawings.pdf
06 Public Works Agreement.pdf
07 Appendices.pdf
Appendix A - Clarified MMRP.pdf
Appendix B - Force Main As Builts.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix D - Approved Plug Valves.pdf
Appendix E - Pothole Reports.pdf
Appendix F - Various Standard Drawings.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix I - Geotechnical Reports.pdf
Bid Plans - Force Main (SIGNED).pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Weka, Inc 2023-06-15 07:18 AM PDT 2023-06-21 09:24 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Griffith Company 2023-06-26 01:59 PM PDT 2023-06-30 06:51 AM PDT Appendix E - Pothole Reports.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix A - Clarified MMRP.pdf
05 Contract Drawings.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf

Page 764 of 1492 ends

Albert A. Webb Associates 2023-06-15 08:42 AM PDT 2023-06-15 08:44 AM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf
ELITE TEXTILE TRADING LLC 2023-06-16 03:08 AM PDT 2023-06-24 04:50 PM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix D - Approved Plug Valves.pdf
Appendix E - Pothole Reports.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
03 Special Conditions.pdf
04 Technical Specifications.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Wayne Enterprises 2023-06-13 08:42 AM PDT 2023-06-30 08:42 AM PDT Nor-Cal Pipeline Services 2023-06-19 08:11 AM PDT 2023-06-26 01:49 PM PDT Access Report_20230621.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Ferreira Construction Company Inc.2023-06-15 10:50 AM PDT 2023-06-15 10:52 AM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf
Dodge Data & Analytics 2023-06-14 08:00 AM PDT 2023-06-15 03:17 AM PDT Bid Plans - Force Main (SIGNED).pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
MLC CONSTRUCTORS Inc 2023-06-20 11:04 AM PDT 2023-06-20 11:12 AM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
DOWNING CONSTRUCTION, INC.2023-06-15 07:11 AM PDT 2023-06-27 08:51 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
IMS 2023-06-13 01:17 AM PDT 2023-06-13 01:17 AM PDT
Tri-Star Contracting II, Inc. 2023-06-16 09:50 AM PDT 2023-06-19 11:37 AM PDT Bid Plans - Force Main (SIGNED).pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
The Bid Lab 2023-06-14 11:22 PM PDT 2023-06-29 11:49 PM PDT KDC Systems 2023-06-23 04:38 PM PDT 2023-06-28 02:02 PM PDT Construction Bid Source 2023-06-21 09:45 AM PDT 2023-06-21 09:49 AM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf
Kingmen Construction, Inc.2023-06-15 05:55 AM PDT 2023-06-15 05:55 AM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf
Core & Main 2023-06-21 09:28 AM PDT 2023-06-28 08:02 AM PDT Access Report_20230621.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Big Ben Inc.2023-06-29 11:06 PM PDT 2023-06-29 11:25 PM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf
04 Technical Specifications.pdf
Bid Plans - Force Main (SIGNED).pdf
Access Report_20230621.pdf
BONADIMAN WATER INC.2023-06-28 03:15 PM PDT 2023-06-28 03:17 PM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf

Page 765 of 1492 ends

LAE Associates, Inc.2023-06-22 11:36 AM PDT 2023-06-28 10:23 AM PDT Pyramid Building & Engineering, Inc 2023-06-19 09:41 AM PDT 2023-06-19 09:51 AM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Montauk 2023-06-13 01:29 AM PDT 2023-06-27 06:10 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
All American Asphalt 2023-06-21 09:34 AM PDT 2023-06-21 09:34 AM PDT AGC Plan Room 2023-06-15 01:11 PM PDT 2023-06-21 09:33 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Dodge Data & Analytics 2023-06-13 03:18 PM PDT 2023-06-29 03:18 PM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Climate Survival Solutions 2023-06-15 02:51 AM PDT 2023-06-23 01:45 AM PDT 04 Technical Specifications.pdf
Bid Plans - Force Main (SIGNED).pdf
05 Contract Drawings.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Scorpion Backhoe Inc 2023-06-16 08:15 AM PDT 2023-06-16 08:17 AM PDT 03 Special Conditions.pdf
PREMIERWEST LANDSCAPE 2023-06-19 10:19 AM PDT 2023-06-28 03:10 PM PDT 05 Contract Drawings.pdf
Bid Plans - Force Main (SIGNED).pdf
Tukmol General Contractor 2023-06-15 03:16 AM PDT 2023-06-15 03:16 AM PDT Webtech 2023-06-15 01:44 AM PDT 2023-06-15 02:11 AM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf

Page 766 of 1492 ends

Dangelo Co.2023-06-28 10:38 AM PDT 2023-06-28 10:47 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Cushman Contracting Corporation 2023-06-26 11:01 AM PDT 2023-06-26 11:01 AM PDT Tri-Star Contracting II, Inc.2023-06-19 11:58 AM PDT 2023-06-20 09:59 AM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
The Van Dyke Corporation 2023-06-15 07:24 PM PDT 2023-06-16 10:46 AM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Vido Artukovich & Son Inc./ Vidmar Inc. a JV 2023-06-16 01:31 PM PDT 2023-06-21 12:34 PM PDT Access Report_20230621.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Pro-Craft Construction, Inc.2023-06-22 02:27 PM PDT 2023-06-22 02:33 PM PDT Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
Appendix E - Pothole Reports.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
Access Report_20230621.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix F - Various Standard Drawings.pdf
Appendix D - Approved Plug Valves.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
MTGL Testing Laboratories 2023-06-22 12:02 PM PDT 2023-06-22 12:07 PM PDT Kiewit Infrastructure West Co.2023-06-15 08:00 AM PDT 2023-06-21 08:25 AM PDT 01 RFB Beaumont Mesa Lift Station Force Main.pdf

Page 767 of 1492 ends

INLAND WATER WORKS SUPPLY CO.2023-06-28 09:25 AM PDT 2023-06-28 09:30 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf
Griffith Company 2023-06-19 09:40 AM PDT 2023-06-26 10:31 AM PDT Access Report_20230621.pdf
Bid Plans - Force Main (SIGNED).pdf
Appendix I - Geotechnical Reports.pdf
Appendix H - 6-in Force Main Bypass Exhibit.pdf
Appendix G - Pressure Testing Scope.pdf
Appendix F - Various Standard Drawings.pdf
Appendix E - Pothole Reports.pdf
Appendix D - Approved Plug Valves.pdf
Appendix C - QST Impacted Project Requirements.pdf
Appendix B - Force Main As Builts.pdf
Appendix A - Clarified MMRP.pdf
07 Appendices.pdf
06 Public Works Agreement.pdf
05 Contract Drawings.pdf
04 Technical Specifications.pdf
03 Special Conditions.pdf
02 General Conditions.pdf
01 RFB Beaumont Mesa Lift Station Force Main.pdf

Page 768 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

38 02 GENERAL CONDITIONS
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

Page 769 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
1 GENERAL CONDITIONS

TABLE OF CONTENTS
GC01. DEFINITIONS ......................................................................................................... 1 GC02. CONTRACT DOCUMENTS .................................................................................... 2 GC03. CONTRACTS DOCUMENTS: COPIES & MAINTENANCE ..................................... 3 GC04. DETAIL DRAWINGS AND INSTRUCTIONS ........................................................... 3 GC05. EXISTENCE OF UTILITIES AT THE WORK SITE ................................................... 4 GC06. SCHEDULE ............................................................................................................ 5 GC07. SUBSTITUTIONS ................................................................................................... 5 GC08. SHOP DRAWINGS ................................................................................................. 7 GC09. SUBMITTALS ......................................................................................................... 7 GC10. MATERIALS ........................................................................................................... 7 GC11. CONTRACTOR’S SUPERVISION .......................................................................... 8 GC12. WORKERS ............................................................................................................. 8 GC13. SUBCONTRACTORS ............................................................................................. 8 GC14. PERMITS AND LICENSES ..................................................................................... 9 GC15. UTILITY USAGE ..................................................................................................... 9 GC16. INSPECTION FEES FOR PERMANENT UTILITIES ..............................................10 GC17. TRENCHES ...........................................................................................................10 GC18. DIVERSION OF RECYCLABLE WASTE MATERIALS ...........................................11 GC19. REMOVAL OF HAZARDOUS MATERIALS ............................................................11 GC20. SANITARY FACILITIES .........................................................................................11 GC21. AIR POLLUTION CONTROL..................................................................................12 GC22. COMPLIANCE WITH STATE STORM WATER PERMIT ........................................12 GC23. CLEANING UP ......................................................................................................13 GC24. LAYOUT AND FIELD ENGINEERING ....................................................................13 GC25. EXCESSIVE NOISE ..............................................................................................13 GC26. TESTS AND INSPECTIONS ..................................................................................14 GC27. PROTECTION OF WORK AND PROPERTY .........................................................15 GC28. CONTRACTORS MEANS AND METHODS ...........................................................16 GC29. INSPECTOR’S FIELD OFFICE ..............................................................................16 GC30. AUTHORIZED REPRESENTATIVES ....................................................................17 GC31. HOURS OF WORK ................................................................................................17 GC32. PAYROLL RECORDS............................................................................................17 GC33. PREVAILING RATES OF WAGES .........................................................................18 GC34. EMPLOYMENT OF APPRENTICES ......................................................................19 GC35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY.........................19 GC36. LABOR/EMPLOYMENT SAFETY ..........................................................................20 GC37. WORKERS’ COMPENSATION INSURANCE ........................................................20 GC38. EMPLOYER’S LIABILITY INSURANCE .................................................................20 GC39. COMMERCIAL GENERAL LIABILITY INSURANCE ..............................................20 GC40. AUTOMOBILE LIABILITY INSURANCE .................................................................21 GC41. BUILDER’S RISK [“ALL RISK”] ..............................................................................22 GC42. FORM AND PROOF OF CARRIAGE OF INSURANCE ..........................................22 GC43. TIME FOR COMPLETION AND LIQUIDATED DAMAGES .....................................23 GC44. COST BREAKDOWN AND PERIODIC ESTIMATES ..............................................24

Page 770 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
2 GC45. MOBILIZATION .....................................................................................................25 GC46. PAYMENTS ...........................................................................................................26 GC47. PAYMENTS WITHHELD AND BACKCHARGES....................................................27 GC48. CHANGES AND EXTRA WORK ............................................................................27 GC49. OCCUPANCY ........................................................................................................31 GC50. INDEMNIFICATION ...............................................................................................31 GC51. RECORD (“AS BUILT”) DRAWINGS ......................................................................32 GC52. RESOLUTION OF CONSTRUCTION CLAIMS ......................................................32 GC53. CITY’S RIGHT TO TERMINATE CONTRACT ........................................................34 GC54. WARRANTY AND GUARANTEE ...........................................................................36 GC55. DOCUMENT RETENTION & EXAMINATION ........................................................37 GC56. SOILS INVESTIGATIONS .....................................................................................37 GC57. SEPARATE CONTRACTS .....................................................................................37 GC58. NOTICE AND SERVICE THEREOF .......................................................................38 GC59. NOTICE OF THIRD PARTY CLAIMS .....................................................................38 GC60. STATE LICENSE BOARD NOTICE........................................................................38 GC61. INTEGRATION ......................................................................................................38 GC62. ASSIGNMENT .......................................................................................................39 GC63. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL ENTITY ............39 GC64. ASSIGNMENT OF ANTITRUST ACTIONS ............................................................39 GC65. PROHIBITED INTERESTS ....................................................................................39 GC66. LAWS AND REGULATIONS ..................................................................................39 GC67. PATENT FEES OR ROYALTIES. ...........................................................................40 GC68. OWNERSHIP OF DRAWING .................................................................................40 GC69. NOTICE OF TAXABLE POSSESSORY INTEREST ...............................................40

Page 771 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
1 GC01. DEFINITIONS
a. Acceptable, Acceptance or words of similar import shall be understood to be the acceptance of the Engineer and/or the City.
b. Act of God an Act of God is an earthquake of magnitude 3.5 on the Richter scale and tidal waves.
c. Approval means written authorization by Engineer and/or City. d. Contract Documents includes all documents as stated in the Contract. e. City and Contractor are those stated in the Contract. The terms City and Owner may be used interchangeably.
f. Day shall mean calendar day unless otherwise specifically designated. g. Engineer shall mean the General Manager, or his or her designee, of the Department of Public Works for the City of Beaumont, acting either directly or through properly authorized agents, such as agents acting within the scope of the particular duties entrusted to them. Also sometimes referred to as the “City’s Representative” or “Representative” in the Contract Documents. h. Equal, Equivalent, Satisfactory, Directed, Designated, Selected, As Required and similar words shall mean the written approval, selection, satisfaction, direction, or similar action of the Engineer and/or City.
i. Indicated, Shown, Detailed, Noted, Scheduled or words of similar meaning shall mean that reference is made to the drawings, unless otherwise noted. It shall be understood that the direction, designation, selection, or similar import of the Engineer and/or City is intended, unless stated otherwise. j. Install means the complete installation of any item, equipment or material. k. Material shall include machinery, equipment, manufactured articles, or construction such as form work, fasteners, etc., and any other classes of material to be furnished in connection with the Contract. All materials shall be new unless specified otherwise.
l. Perform shall mean that the Contractor, at Contractor’s expense, shall take all actions necessary to complete The Work, including furnishing of necessary labor, tools, and equipment, and providing and installing Materials that are indicated, specified, or required to complete such performance.
m. Project is The Work planned by City as provided in the Contract Documents.

Page 772 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
2 n. Provide shall include provide complete in place, that is furnish, install, test and make ready for use.
o. Recyclable Waste Materials shall mean materials removed from the Project site which are required to be diverted to a recycling center rather than an area landfill.

Recyclable Waste Materials include asphalt, concrete, brick, concrete block, and rock.
p. Specifications means that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards and workmanship for the work. Except for Sections 1-9 of the Standard Specifications for Public Works Construction (“Greenbook”), 2015 Edition which are specifically excluded from incorporation into these Contract Documents, the Work shall be done in accordance with the Greenbook, including all current supplements, addenda, and revisions thereof. In the case of conflict between the Greenbook and the Contract Documents, the Contract Documents shall prevail. q. The Work means the entire improvement planned by the City pursuant to the Contract Documents.
r. Work means labor, equipment and materials incorporated in, or to be incorporated in the construction covered by the Contract Documents.

GC02. CONTRACT DOCUMENTS
a. Contract Documents. The Contract Documents are complementary, and what is called for by one shall be as binding as if called for by all. b. Interpretations. The Contract Documents are intended to be fully cooperative and to be complementary. If Contractor observes that any documents are in conflict, the Contractor shall promptly notify the Engineer in writing. In case of conflicts between the Contract Documents, the order of precedence shall be as follows:

1. Change Orders or Work Change Directives

2. Addenda

3. Special Provisions (or Special Conditions)

4. Technical Specifications

5. Plans (Contract Drawings)

6. Contract

7. General Conditions

8. Instructions to Bidders

9. Notice Inviting Bids

10. Contractor’s Bid Forms

11. Greenbook Standard Specifications (Sections 1-9 Excluded)

12. Standard Plans

Page 773 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
3 13. Reference Documents

With reference to the Drawings, the order of precedence shall be as follows:

1. Figures govern over scaled dimensions

2. Detail drawings govern over general drawings

3. Addenda or Change Order drawings govern over Contract Drawings

4. Contract Drawings govern over Standard Drawings

5. Contract Drawings govern over Shop Drawings

c. Conflicts in Contract Documents. Notwithstanding the orders of precedence established above, in the event of conflicts, the higher standard shall always apply. d. Organization of Contract Documents. Organization of the Contract Documents into divisions, sections, and articles, and arrangement of drawings shall not control the Contractor in dividing The Work among subcontractors or in establishing the extent of Work to be performed by any trade.

GC03. CONTRACTS DOCUMENTS: COPIES & MAINTENANCE
Contractor will be furnished, free of charge, five (5) copies of the Contract Documents.

Additional copies may be obtained at cost of reproduction.

Contractor shall maintain a clean, undamaged set of Contract Documents at the Project site.

GC04. DETAIL DRAWINGS AND INSTRUCTIONS
a. Examination of Contract Documents. Before commencing any portion of The Work, Contractor shall again carefully examine all applicable Contract Documents, the Project site and other information given to Contractor as to materials and methods of construction and other Project requirements. Contractor shall immediately notify the Engineer of any potential error, inconsistency, ambiguity, conflict or lack of detail or explanation. If Contractor performs, permits, or causes the performance of any Work which is in error, inconsistent or ambiguous, or not sufficiently detailed or explained, Contractor shall bear any and all resulting costs, including, without limitation, the cost of correction. In no case shall the Contractor or any subcontractor proceed with Work if uncertain as to the applicable requirements.
b. Additional Instructions. After notification of any error, inconsistency, ambiguity, conflict or lack of detail or explanation, the Engineer will provide any required additional instructions, by means of drawings or other written direction, necessary for proper execution of Work.
c. Quality of Parts, Construction and Finish. All parts of The Work shall be of the best quality of their respective kinds and the Contractor must use all diligence to

Page 774 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
4 inform itself fully as to the required construction and finish. In no case shall Contractor proceed with The Work without obtaining first from the Engineer such Approval may be necessary for the proper performance of Work. d. Contractor’s Variation from Contract Document Requirements. If it is found that the Contractor has varied from the requirements of the Contract Documents including the requirement to comply with all applicable laws, ordinances, rules and regulations, the Engineer may at any time, before or after completion of the Work, order the improper Work removed, remade or replaced by the Contractor at the Contractor’s expense.

GC05. EXISTENCE OF UTILITIES AT THE WORK SITE
a. The City has endeavored to determine the existence of utilities at the Project site from the records of the owners of known utilities in the vicinity of the Project. The positions of these utilities as derived from such records are shown on the Plans. b. No excavations were made to verify the locations shown for underground utilities.

The service connections to these utilities are not shown on the plans. It shall be the responsibility of the Contractor to determine the exact location of all service connections. The Contractor shall make its own investigations, including exploratory excavations, to determine the locations and type of service connections, prior to commencing Work which could result in damage to such utilities. The Contractor shall immediately notify the City and Engineer in writing of any utility discovered in a different position than shown on the Plans or which is not shown on the Plans.
c. All water meters, water valves, fire hydrants, electrical utility vaults, telephone vaults, gas utility valves, and other subsurface structures shall be relocated or adjusted to final grade by the Contractor. Locations of existing utilities shown on the Plans are approximate and may not be complete. The Contractor shall be responsible for coordinating its Work with all utility companies during the construction of The Work.
d. Notwithstanding the above, pursuant to Section 4215 of the Government Code, the City has the responsibility to identify, with reasonable accuracy, main or trunkline facilities on the plans and specifications. In the event that main or trunkline utility facilities are not identified with reasonable accuracy in the plans and specifications made a part of the invitation for bids, City shall assume the responsibility for their timely removal, relocation, or protection. e. Contractor, except in an emergency, shall contact the appropriate regional notification center, Southern California Underground Service Alert at 1-800-227- 2600 at least two working days prior to commencing any excavation if the excavation will be performed in an area which is known, or reasonably should be known, to contain subsurface installations other than the underground facilities

Page 775 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
5 owned or operated by the City, and obtain an inquiry identification number from that notification center. No excavation shall be commenced or carried out by the Contractor unless such an inquiry identification number has been assigned to the Contractor or any subcontractor of the Contractor and the City has been given the identification number by the Contractor.

GC06. SCHEDULE
a. Estimated Schedule. Within fourteen (14) days after the issuance of the Notice to Proceed, Contractor shall prepare a Project schedule and shall submit this to the Engineer for Approval. The receipt or Approval of any schedules by the Engineer or the City shall not in any way relieve the Contractor of its obligations under the Contract Documents. The Contractor is fully responsible to determine and provide for any and all staffing and resources at levels which allow for good quality and timely completion of the Project. Contractor’s failure to incorporate all elements of Work required for the performance of the Contract or any inaccuracy in the schedule shall not excuse the Contractor from performing all Work required for a completed Project within the specified Contract time period. If the required schedule is not received by the time the first payment under the Contract is due, Contractor shall not be paid until the schedule is received, reviewed and accepted by the Engineer.
b. Schedule Contents. The schedule shall allow enough time for inclement weather.

The schedule shall indicate the beginning and completion dates of all phases of construction; critical path for all critical, sequential time related activities; and “float time” for all “slack” or “gaps” in the non-critical activities. The schedule shall clearly identify all staffing and other resources which in the Contractor’s judgment are needed to complete the Project within the time specified for completion. Schedule duration shall match the Contract time. Schedules indicating early completion will be rejected.
c. Schedule Updates. Contractor shall continuously update its construction schedule. Contractor shall submit an updated and accurate construction schedule to the Engineer whenever requested to do so by Engineer and with each progress payment request. The Engineer may withhold progress payments or other amounts due under the Contract Documents if Contractor fails to submit an updated and accurate construction schedule.

GC07. SUBSTITUTIONS
a. Pursuant to Public Contract Code Section 3400(b) the City may make a finding that is described in the invitation for bids that designates certain products, things, or services by specific brand or trade name.
b. Unless specifically designated in the Contract Documents, whenever any material, process, or article is indicated or specified by grade, patent, or proprietary name

Page 776 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
6 or by name of manufacturer, such Specifications shall be deemed to be used for the purpose of facilitating the description of the material, process or article desired and shall be deemed to be followed by the words “or equal.” Contractor may, unless otherwise stated, offer for substitution any material, process or article which shall be substantially equal or better in every respect to that so indicated or specified in the Contract Documents. However, the City may have adopted certain uniform standards for certain materials, processes and articles. c. Contractor shall submit requests, together with substantiating data, for substitution of any “or equal” material, process or article no later than thirty-five (35) days after award of the Contract. To facilitate the construction schedule and sequencing, some requests may need to be submitted before thirty-five (35) days after award of Contract. Provisions regarding submission of “or equal” requests shall not in any way authorize an extension of time for performance of this Contract. If a proposed “or equal” substitution request is rejected, Contractor shall be responsible for providing the specified material, process or article. The burden of proof as to the equality of any material, process or article shall rest with the Contractor. The City has the complete and sole discretion to determine if a material, process or article is an “or equal” material, process or article that may be substituted.
d. Data required to substantiate requests for substitutions of an “or equal” material, process or article data shall include a signed affidavit from the Contractor stating that, and describing how, the substituted “or equal” material, process or article is equivalent to that specified in every way except as listed on the affidavit.

Substantiating data shall include any and all illustrations, specifications, and other relevant data including catalog information which describes the requested substituted “or equal” material, process or article, and substantiates that it is an “or equal” to the material, process or article. The substantiating data must also include information regarding the durability and lifecycle cost of the requested substituted “or equal” material, process or article. Failure to submit all the required substantiating data, including the signed affidavit, to the City in a timely fashion will result in the rejection of the proposed substitution.
e. The Contractor shall bear all of the City’s costs associated with the review of substitution requests.
f. The Contractor shall be responsible for all costs related to a substituted “or equal” material, process or article.
g. Contractor is directed to the Special Conditions (if any) to review any findings made pursuant to Public Contract Code section 3400.

Page 777 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
7 GC08. SHOP DRAWINGS
a. Contractor shall check and verify all field measurements and shall submit with such promptness as to provide adequate time for review and cause no delay in his own Work or in that of any other contractor, subcontractor, or worker on the Project, six (6) copies of all shop or setting drawings, calculations, schedules, and materials list, and all other provisions required by the Contract. Contractor shall sign all submittals affirming that submittals have been reviewed and approved by Contractor prior to submission to Engineer. Each signed submittal shall affirm that the submittal meets all the requirements of the Contract Documents except as specifically and clearly noted and listed on the cover sheet of the submittal. b. Contractor shall make any corrections required by the Engineer, and file with the Engineer six (6) corrected copies each, and furnish such other copies as may be needed for completion of the Work. Engineer’s approval of shop drawings shall not relieve Contractor from responsibility for deviations from the Contract Documents unless Contractor has, in writing, called Engineer’s attention to such deviations at time of submission and has secured the Engineer’s written Approval.

Engineer’s Approval of shop drawings shall not relieve Contractor from responsibility for errors in shop drawings.

GC09. SUBMITTALS
a. Contractor shall furnish to the Engineer for approval, prior to purchasing or commencing any Work, a log of all samples, material lists and certifications, mix designs, schedules, and other submittals, as required in the specifications. The log shall indicate whether samples will be provided in accordance with other provisions of this Contract.
b. Contractor will provide samples and submittals, together with catalogs and supporting data required by the Engineer, to the Engineer within a reasonable time period to provide for adequate review and avoid delays in the Work. c. These requirements shall not authorize any extension of time for performance of this Contract. Engineer will check and approve such samples, but only for conformance with design concept of work and for compliance with information given in the Contract Documents. Work shall be in accordance with approved samples and submittals.

GC10. MATERIALS
a. Except as otherwise specifically stated in the Contract Documents, Contractor shall provide and pay for all materials, labor, tools, equipment, water, lights, power, transportation, superintendence, temporary constructions of every nature, and all other services and facilities of every nature whatsoever necessary to execute and complete this Contract within specified time.

Page 778 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
8 b. Unless otherwise specified, all materials shall be new and the best of their respective kinds and grades as noted and/or specified, and workmanship shall be of good quality.
c. Materials shall be furnished in ample quantities and at such times as to ensure uninterrupted progress of The Work and shall be stored properly and protected as required by the Contract Documents. Contractor shall be entirely responsible for damage or loss by weather or other causes to materials or Work. d. No materials, supplies, or equipment for Work under this Contract shall be purchased subject to any chattel mortgage or under a conditional sale or other agreement by which an interest therein or in any part thereof is retained by the seller or supplier. Contractor warrants good title to all material, supplies, and equipment installed or incorporated in the work and agrees upon completion of all work to deliver the Project, to the City free from any claims, liens, or charges. e. Materials shall be stored on the Project site in such manner so as not to interfere with any operations of the City or any independent contractor.

GC11. CONTRACTOR’S SUPERVISION
Contractor shall continuously keep at the Project site, a competent and experienced full- time Project superintendent approved by the City. Superintendent must be able to proficiently speak, read and write in English. Contractor shall continuously provide efficient supervision of the Project.

GC12. WORKERS
a. Contractor shall at all times enforce strict discipline and good order among its employees. Contractor shall not employ on the Project any unfit person or any one not skilled in the Work assigned to him or her.
b. Any person in the employ of the Contractor whom the City may deem incompetent or unfit shall be dismissed from The Work and shall not be employed on this Project except with the written Approval of the City.

GC13. SUBCONTRACTORS
a. Contractor agrees to bind every subcontractor to the terms of the Contract Documents as far as such terms are applicable to subcontractor’s portion of The Work. Contractor shall be as fully responsible to the City for the acts and omissions of its subcontractors and of persons either directly or indirectly employed by its subcontractors, as Contractor is for acts and omissions of persons directly employed by Contractor. Nothing contained in these Contract Documents shall create any contractual relationship between any subcontractor and the City.

Page 779 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
9 b. The City reserves the right to Approve all subcontractors. The City’s Approval of any subcontractor under this Contract shall not in any way relieve Contractor of its obligations in the Contract Documents.
c. Prior to substituting any subcontractor listed in the Bid Forms, Contractor must comply with the requirements of the Subletting and Subcontracting Fair Practices Act pursuant to California Public Contract Code section 4100 et seq.

GC14. PERMITS AND LICENSES
Permits and licenses necessary for prosecution of The Work shall be secured and paid for by Contractor, unless otherwise specified in the Contract Documents. a. Contractor shall obtain and pay for all other permits and licenses required for The Work, including excavation permit and for plumbing, mechanical and electrical work and for operations in or over public streets or right of way under jurisdiction of public agencies other than the City.
b. The Contractor shall arrange and pay for all off-site inspection of the Work related to permits and licenses, including certification, required by the specifications, drawings, or by governing authorities, except for such off-site inspections delineated as the City's responsibility pursuant to the Contract Documents.
c. Before Acceptance of the Project, the Contractor shall submit all licenses, permits, certificates of inspection and required approvals to the City.

GC15. UTILITY USAGE
a. All temporary utilities, including but not limited to electricity, water, gas, and telephone, used on the Work shall be furnished and paid for by Contractor.

Contractor shall Provide necessary temporary distribution systems, including meters, if necessary, from distribution points to points on The Work where the utility is needed. Upon completion of The Work, Contractor shall remove all temporary distribution systems.
b. Contractor shall provide necessary and adequate utilities and pay all costs for water, electricity, gas, oil, and sewer charges required for completion of the Project.
c. All permanent meters Installed shall be listed in the Contractor’s name until Project Acceptance.
d. If the Contract is for construction in existing facilities, Contractor may, with prior written Approval of the City, use the City’s existing utilities by compensating the City for utilities used by Contractor.

Page 780 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
10 GC16. INSPECTION FEES FOR PERMANENT UTILITIES
All inspection fees and other municipal charges for permanent utilities including, but not limited to, sewer, electrical, phone, gas, water, and irrigation shall be paid for by the City.

Contractor shall be responsible for arranging the payment of such fees, but inspection fees and other municipal fees relating to permanent utilities shall be paid by the City.

Contractor may either request reimbursement from the City for such fees, or shall be responsible for arranging and coordination with City for the payment of such fees.

GC17. TRENCHES
a. Trenches Five Feet or More in Depth. The Contractor shall submit to the City, in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping or other provisions to be made for worker protection from the hazard of caving ground during the excavation of any trench or trenches five feet or more in depth. If the plan varies from shoring system standards, the plan shall be prepared by a registered civil or structural engineer. The plan shall not be less effective than the shoring, bracing, sloping, or other provisions of the Construction Safety Orders, as defined in the California Code of Regulations.
b. Excavations Deeper than Four Feet. If work under this Contract involves digging trenches or other excavation that extends deeper than four feet below the surface, Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any:
1) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law.
2) Subsurface or latent physical conditions at the site differing from those indicated.
3) Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract.

The City shall promptly investigate the conditions, and if it finds that the conditions do so materially differ, or do involve hazardous waste, and cause a decrease or increase in Contractor’s cost of, or the time required for, performance of any part of The Work, shall issue a change order under the procedures described in the Contract Documents.

In the event that a dispute arises between the City and the Contractor as to whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the Contractor’s cost of, or time required for, performance of any

Page 781 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
11 part of The Work, the Contractor shall not be excused from any scheduled completion date provided for by the Contract, but shall proceed with all Work to be performed under the Contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the parties.
c. Groundwater and Dewatering. The Contractor is responsible for all necessary trench and excavation dewatering operations. No additional compensation will be provided should groundwater levels be encountered that are different than those described in the plans and specifications. Discharge of all water must comply with the State Water Resources Control Board’s NPDES permit requirements, as described in these specifications.

GC18. DIVERSION OF RECYCLABLE WASTE MATERIALS
In compliance with the applicable City’s waste reduction and recycling efforts, Contractor shall divert all Recyclable Waste Materials to appropriate recycling centers. Contractor will be required to submit weight tickets and written proof of diversion with its monthly progress payment requests. Contractor shall complete and execute any certification forms required by City or other applicable agencies to document Contractor’s compliance with these diversion requirements. All costs incurred for these waste diversion efforts shall be the responsibility of the Contractor.

GC19. REMOVAL OF HAZARDOUS MATERIALS
Should Contractor encounter material reasonably believed to be polychlorinated biphenyl (PCB) or other toxic wastes and hazardous materials which have not been rendered harmless at the Project site, the Contractor shall immediately stop work at the affected Project site and shall report the condition to the City in writing. The City shall contract for any services required to directly remove and/or abate PCBs and other toxic wastes and hazardous materials, if required by the Project site(s), and shall not require the Contractor to subcontract for such services. The Work in the affected area shall not thereafter be resumed except by written agreement of the City and Contractor.

GC20. SANITARY FACILITIES
Contractor shall provide sanitary temporary toilet buildings for the use of all workers. All toilets shall comply with local codes and ordinances. Toilets shall be kept supplied with toilet paper and shall have workable door fasteners. Toilets shall be serviced no less than once weekly and shall be present in a quantity of not less than 1 per 20 workers as required by CAL-OSHA regulation. The toilets shall be maintained in a sanitary condition at all times. Use of toilet facilities in The Work under construction shall not be permitted.

Any other Sanitary Facilities required by CAL-OSHA shall be the responsibility of the Contractor.

Page 782 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
12 GC21. AIR POLLUTION CONTROL
Contractor shall comply with all air pollution control rules, regulations, ordinances and statutes. All containers of paint, thinner, curing compound, solvent or liquid asphalt shall be labeled to indicate that the contents fully comply with the applicable material requirements.

GC22. COMPLIANCE WITH STATE STORM WATER PERMIT
a. Contractor shall be required to comply with all conditions of the State Water Resources Control Board (“State Water Board”) National Pollutant Discharge Elimination System General Permit for Waste Discharge Requirements for Discharges of Storm Water Runoff Associated with Construction Activity (“Permit”) for all construction activity which results in the disturbance of in excess of one acre of total land area or which is part of a larger common area of development or sale.

Contractor shall be responsible for filing the Notice of Intent and for obtaining the Permit. Contractor shall be solely responsible for preparing and implementing a Storm Water Pollution Prevention Plan (“SWPPP”) prior to initiating Work. In bidding on this Contract, it shall be Contractor’s responsibility to evaluate the cost of procuring the Permit and preparing the SWPPP as well as complying with the SWPPP and any necessary revision to the SWPPP. Contractor shall comply with all requirements of the State Water Resources Control Board. Contractor shall include all costs of compliance with specified requirements in the Contract amount. b. Contractor shall be responsible for procuring, implementing and complying with the provisions of the Permit and the SWPPP, including the standard provisions, monitoring and reporting requirements as required by the Permit. Contractor shall provide copies of all reports and monitoring information to the Engineer. c. Contractor shall comply with the lawful requirements of any applicable municipality, the City, drainage district, and other local agencies regarding discharges of storm water to separate storm drain system or other watercourses under their jurisdiction, including applicable requirements in municipal storm water management programs.
d. Storm, surface, nuisance, or other waters may be encountered at various times during construction of The Work. Therefore, the Contractor, by submitting a Bid, hereby acknowledges that it has investigated the risk arising from such waters, has prepared its Bid accordingly, and assumes any and all risks and liabilities arising therefrom.
e. Failure to comply with the Permit is in violation of federal and state law. Contractor hereby agrees to indemnify and hold harmless City, its officials, officers, agents, employees and authorized volunteers from and against any and all claims, demands, losses or liabilities of any kind or nature which City, its officials, officers, agents, employees and authorized volunteers may sustain or incur for

Page 783 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
13 noncompliance with the Permit arising out of or in connection with the Project, except for liability resulting from the sole established negligence, willful misconduct or active negligence of the City, its officials, officers, agents, employees or authorized volunteers. City may seek damages from Contractor for delay in completing the Contract in accordance with the Contract Documents, caused by Contractor’s failure to comply with the Permit.

GC23. CLEANING UP
a. Contractor at all times shall keep premises free from debris such as waste, rubbish, and excess materials and equipment. Contractor shall not store debris under, in, or about the premises. Upon completion of Work, Contractor shall clean the interior and exterior of the building or improvement including fixtures, equipment, walls, floors, ceilings, roofs, window sills and ledges, horizontal projections, and any areas where debris has collected so surfaces are free from foreign material or discoloration. Contractor shall clean and polish all glass, plumbing fixtures, and finish hardware and similar finish surfaces and equipment and contractor shall also remove temporary fencing, barricades, planking and construction toilet and similar temporary facilities from site. Contractor shall also clean all buildings, asphalt and concrete areas to the degree necessary to remove oil, grease, fuel, or other stains caused by Contractor operations or equipment.
b. Contractor shall fully clean up the site at the completion of The Work. If the Contractor fails to immediately clean up at the completion of The Work, the City may do so and the cost of such clean up shall be charged back to the Contractor.

GC24. LAYOUT AND FIELD ENGINEERING
All field engineering required for laying out The Work and establishing grades for earthwork operations shall be furnished by the Contractor at its expense. Layout shall be done by a registered civil engineer Approved by the Engineer. Any required “as-built” drawings of the Work shall be prepared by the registered civil engineer.

GC25. EXCESSIVE NOISE
a. The Contractor shall use only such equipment on the work and in such state of repair so that the emission of sound therefrom is within the noise tolerance level of that equipment as established by CAL-OSHA.
b. The Contractor shall comply with the most restrictive of the following: (1) local sound control and noise level rules, regulations and ordinances and (2) the requirements contained in these Contract Documents, including hours of operation requirements. No internal combustion engine shall be operated on the Project without a muffler of the type recommended by the manufacturer. Should any muffler or other control device sustain damage or be determined to be ineffective or defective, the Contractor shall promptly remove the equipment and shall not

Page 784 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
14 return said equipment to the job until the device is repaired or replaced. Said noise and vibration level requirements shall apply to all equipment on the job or related to the job, including but not limited to, trucks, transit mixers or transit equipment that may or may not be owned by the Contractor.

GC26. TESTS AND INSPECTIONS
a. If the Contract Documents, the Engineer, or any instructions, laws, ordinances, or public authority require any part of The Work to be tested or Approved, Contractor shall provide the Engineer at least two (2) working days notice of its readiness for observation or inspection. If inspection is by a public authority other than the City, Contractor shall promptly inform the City of the date fixed for such inspection.

Required certificates of inspection (or similar) shall be secured by Contractor.

Costs for City testing and City inspection shall be paid by the City. Costs of tests for Work found not to be in compliance shall be paid by the Contractor. b. If any Work is done or covered up without the required testing or approval, the Contractor shall uncover or deconstruct the Work, and the Work shall be redone after completion of the testing at the Contractor’s cost in compliance with the Contract Documents.
c. Where inspection and testing are to be conducted by an independent laboratory or agency, materials or samples of materials to be inspected or tested shall be selected by such laboratory or agency, or by the City, and not by Contractor. All tests or inspections of materials shall be made in accordance with the commonly recognized standards of national organizations.
d. In advance of manufacture of materials to be supplied by Contractor which must be tested or inspected, Contractor shall notify the City so that the City may arrange for testing at the source of supply. Any materials which have not satisfactorily passed such testing and inspection shall not be incorporated into The Work. e. If the manufacture of materials to be inspected or tested will occur in a plant or location outside the geographic limits of City, the Contractor shall pay for any excessive or unusual costs associated with such testing or inspection, including but not limited to excessive travel time, standby time and required lodging. f. Reexamination of Work may be ordered by the City. If so ordered, Work must be uncovered or deconstructed by Contractor. If Work is found to be in accordance with the Contract Documents, the City shall pay the costs of reexamination and reconstruction. If such work is found not to be in accordance with the Contract Documents, Contractor shall pay all costs.

Page 785 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
15 GC27. PROTECTION OF WORK AND PROPERTY
a. The Contractor shall be responsible for all damages to persons or property that occur as a result of The Work. Contractor shall be responsible for the proper care and protection of all materials delivered and Work performed until completion and final Acceptance by the City. All Work shall be solely at the Contractor’s risk.

Contractor shall adequately protect adjacent property from settlement or loss of lateral support as necessary. Contractor shall comply with all applicable safety laws and building codes to prevent accidents or injury to persons on, about, or adjacent to the Project site where Work is being performed. Contractor shall erect and properly maintain at all times, as required by field conditions and progress of work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and the public, and shall post danger signs warning against hazards created in the course of construction.
b. In an emergency affecting safety of life or of work or of adjoining property, Contractor, without special instruction or authorization from the Engineer, is hereby permitted to act to prevent such threatened loss or injury; and Contractor shall so act, without appeal, if so authorized or instructed by the Engineer or the City. Any compensation claimed by Contractor on account of emergency work shall be determined by and agreed upon by the City and the Contractor. c. Contractor shall provide such heat, covering, and enclosures as are necessary to protect all Work, materials, equipment, appliances, and tools against damage by weather conditions.
d. Contractor shall take adequate precautions to protect existing sidewalks, curbs, pavements, utilities, and other adjoining property and structures, and to avoid damage thereto, and Contractor shall repair any damage thereto caused by The Work operations. Contractor shall:
1) Enclose the working area with a substantial barricade, and arrange work to cause minimum amount of inconvenience and danger to the public. 2) Provide substantial barricades around any shrubs or trees indicated to be preserved.
3) Deliver materials to the Project site over a route designated by the Engineer. 4) Provide any and all dust control required and follow the Applicable air quality regulations as appropriate. If the Contractor does not comply, the City shall have the immediate authority to provide dust control and deduct the cost from payments to the Contractor.
5) Confine Contractor’s apparatus, the storage of materials, and the operations of its workers to limits required by law, ordinances, permits, or

Page 786 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
16 directions of the Engineer. Contractor shall not unreasonably encumber the Project site with its materials.
6) Take care to prevent disturbing or covering any survey markers, monuments, or other devices marking property boundaries or corners. If such markers are disturbed by accident, they shall be replaced by an approved civil engineer or land surveyor, at no cost to the City. 7) Ensure that existing facilities, fences and other structures are all adequately protected and that, upon completion of all Work, all facilities that may have been damaged are restored to a condition acceptable to the City.
8) Preserve and protect from injury all buildings, pole lines and all direction, warning and mileage signs that have been placed within the right-of-way. 9) At the completion of work each day, leave the Project site in a clean, safe condition.
10) Comply with any stage construction and traffic handling plans. Access to residences and businesses shall be maintained at all times.

These precautionary measures will apply continuously and not be limited to normal working hours. Full compensation for the Work involved in the preservation of life, safety and property as above specified shall be considered as included in the prices paid for the various contract items of Work, and no additional allowance will be made therefor.
e. Should damage to persons or property occur as a result of The Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to adequately memorialize and make a record of what transpired.

The City shall be entitled to inspect and copy any such documentation, video, or photographs.

GC28. CONTRACTORS MEANS AND METHODS
Contractor is solely responsible for the means and methods utilized to Perform The Work.

In no case shall the Contractor’s means and methods deviate from commonly used industry standards.

GC29. INSPECTOR’S FIELD OFFICE
a. The Contractor shall be responsible for providing the inspector’s field office. The Office shall be a substantial waterproof construction with adequate natural light and ventilation by means of stock design windows. Door shall have a key type lock or padlock clasp. The office shall have heating and air conditioning and shall be equipped with a telephone, a telephone answering machine, and a fax machine at Contractor’s expense.

Page 787 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
17 b. A table satisfactory for the study of plans and two chairs shall be Provided by Contractor. Contractor shall Provide and pay for adequate electric lights, local telephone service, and adequate heat and air conditioning for the field office until authorized removal.

GC30. AUTHORIZED REPRESENTATIVES
The City shall designate representatives, who shall have the right to be present at the Project site at all times. The City may designate an inspector who shall have the right to observe all of the Contractor’s Work. The inspector is not authorized to make changes in the Contract Documents. The inspector shall not be responsible for the Contractor’s failure to carry out The Work in accordance with the Contract Documents. Contractor shall provide safe and proper facilities for such access.

GC31. HOURS OF WORK
a. Eight (8) hours of work shall constitute a legal day’s work. The Contractor and each subcontractor shall forfeit, as penalty to the City, twenty-five dollars ($25) for each worker employed in the execution of Work by the Contractor or any subcontractor for each day during which such worker is required or permitted to work more than eight (8) hours in any one day and forty (40) hours in any week in violation of the provisions of the Labor Code, and in particular, Section 1810 to Section 1815, except as provided in Labor Code Section 1815. b. Work shall be accomplished on a regularly scheduled eight (8) hour per day work shift basis, Monday through Friday, between the hours of 7:00 a.m. and 5:00 p.m. c. It shall be unlawful for any person to operate, permit, use, or cause to operate any of the following at the Project site, other than between the hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, with no Work allowed on City-observed holidays, unless otherwise Approved by the Engineer:
1) Powered Vehicles
2) Construction Equipment
3) Loading and Unloading Vehicles
4) Domestic Power Tool.

GC32. PAYROLL RECORDS
a. Pursuant to Labor Code Section 1776, the Contractor and each subcontractor shall maintain weekly certified payroll records showing the name, address, social security number, work classification, straight time and overtime hours paid each day and week, and the actual per diem wages paid to each journeyman,

Page 788 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
18 apprentice, worker or other employee employed in connection with the work.

Contractor shall certify under penalty of perjury that records maintained and submitted by Contractor are true and accurate. Contractor shall also require subcontractor(s) to certify weekly payroll records under penalty of perjury. b. The payroll records described herein shall be certified and submitted by the Contractor at a time designated by the City. The Contractor shall also provide the following:
1) A certified copy of the employee’s payroll records shall be made available for inspection or furnished to such employee or his or her authorized representative on request.
2) A certified copy of all payroll records described herein shall be made available for inspection or furnished upon request of the Department of Industrial Relations (“DIR”).
c. The certified payroll records shall be on forms provided by the Division of Labor Standards Enforcement (“DLSE”) of the DIR or shall contain the same information as the forms provided by the DLSE.
d. Any copy of records made available for inspection and furnished upon request to the public shall be marked or obliterated in such a manner as to prevent disclosure of an individual’s name, address, and social security number. The name and address of the Contractor or any subcontractor shall not be marked or obliterated. e. In the event of noncompliance with the requirements of this Section, the Contractor shall have ten (10) days in which to comply subsequent to receipt of written notice specifying any item or actions necessary to ensure compliance with this section.

Should noncompliance still be evident after such ten (10) day period, the Contractor shall, as a penalty to the City, forfeit Twenty-five Dollars ($25.00) for each day, or portion thereof, for each worker until strict compliance is effectuated.

Upon the request of the DIR, such penalties shall be withheld from contract payments.

GC33. PREVAILING RATES OF WAGES
a. The Contractor is aware of the requirements of Labor Code Sections 1720 et seq. and 1770 et seq., as well as California Code of Regulations, Title 8, Section 16000 et seq. (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on certain “public works” and “maintenance” projects. Since this Project involves an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. The Contractor shall obtain a copy of the prevailing rates of per diem wages at the commencement of this Agreement from the website of

Page 789 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
19 the Division of Labor Statistics and Research of the Department of Industrial Relations located at www.dir.ca.gov/dlsr/ . In the alternative, the Contractor may view a copy of the prevailing rates of per diem wages at the City. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to perform work on the Project available to interested parties upon request, and shall post copies at the Contractor’s principal place of business and at the Project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claims, liabilities, costs, penalties or interest arising out of any failure or allege failure to comply with the Prevailing Wage Laws.
b. The Contractor and each subcontractor shall forfeit as a penalty to the City not more than fifty dollars ($50) for each calendar day, or portion thereof, for each worker paid less than the stipulated prevailing wage rate for any work done by him, or by any subcontract under him, in violation of the provisions of the Labor Code.

The difference between such stipulated prevailing wage rate and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the stipulated prevailing wage rate shall be paid to each worker by the Contractor.
c. Contractor shall post, at appropriate conspicuous points on the Project site, a schedule showing all determined general prevailing wage rates and all authorized deductions, if any, from unpaid wages actually earned.
d. If the Work involves federal funds or otherwise requires compliance with the Davis- Bacon Fair Labor Standards Act, the Contractor and all its subcontractors shall comply with the higher of the state or federal prevailing wage rates.

GC34. EMPLOYMENT OF APPRENTICES
The Contractor’s attention is directed to the provisions of Sections 1777.5, 1777.6, and 1777.7 of the Labor Code concerning employment of apprentices by the Contractor or any subcontractor. The Contractor shall obtain a certificate of apprenticeship before employing any apprentice pursuant to Section 1777.5, 1777.6, and 1777.7 of the Labor Code. Information relative to apprenticeship standards, wage schedules, and other requirements may be obtained from the Director of Industrial Relations, the Administrator of Apprenticeships, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.

GC35. NONDISCRIMINATION/EQUAL EMPLOYMENT OPPORTUNITY
Pursuant to Labor Code Section 1735 and other applicable provisions of law, the Contractor and its subcontractors shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap on this Project. The Contractor will take affirmative action to insure that employees are treated during employment or training

Page 790 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
20 without regard to their race, color, religion, sex, national origin, age, political affiliation, marital status, or handicap.

GC36. LABOR/EMPLOYMENT SAFETY
The Contractor shall maintain emergency first aid treatment for his employees which complies with the Federal Occupational Safety and Health Act of 1970 (29 U.S.C. § 651 et seq.), and California Code of Regulations, Title 8, Industrial Relations Division 1, Department of Industrial Relations, Chapter 4.

GC37. WORKERS’ COMPENSATION INSURANCE
The Contractor shall Provide, during the life of this Contract, workers’ compensation insurance for all of the employees engaged in Work under this Contract, on or at the Project site, and, in case any of sublet Work, the Contractor shall require the subcontractor similarly to provide workers’ compensation insurance for all the latter’s employees as prescribed by State law. Any class of employee or employees not covered by a subcontractor’s insurance shall be covered by the Contractor’s insurance. In case any class of employees engaged in work under this Contract, on or at the Project site, is not protected under the Workers’ Compensation Statutes, the Contractor shall provide or shall cause a subcontractor to provide, adequate insurance coverage for the protection of such employees not otherwise protected. The Contractor is required to secure payment of compensation to his employees in accordance with the provisions of Section 3700 of the Labor Code. The Contractor shall file with the City certificates of his insurance protecting workers. Company or companies providing insurance coverage shall be acceptable to the City, if in the form and coverage as set forth in the Contract Documents.

GC38. EMPLOYER’S LIABILITY INSURANCE
Contractor shall provide during the life of this Contract, Employer’s Liability Insurance, including Occupational Disease, in the amount of, at least, one million dollars ($1,000,000.00) per person per accident. Contractor shall provide City with a certificate of Employer’s Liability Insurance. Such insurance shall comply with the provisions of the Contract Documents. The policy shall be endorsed, if applicable, to provide a Borrowed Servant/Alternate Employer Endorsement and contain a Waiver of Subrogation in favor of the City.

GC39. COMMERCIAL GENERAL LIABILITY INSURANCE
a. Contractor shall procure and maintain during the life of this Contract and for such other period as may be required herein, at its sole expense, Commercial General Liability insurance coverage, including but not limited to, premises liability, contractual liability, products/completed operations if applicable, personal and advertising injury – which may arise from or out of Contractor’s operations, use, and management of the Project site, or the performance of its obligations hereunder. Policy limits shall not be less than $2,000,000 per occurrence for bodily

Page 791 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
21 injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit. b. Such policy shall comply with all the requirements of this Article. The limits set forth herein shall apply separately to each insured against whom claims are made or suits are brought, except with respect to the limits of liability. Further the limits set forth herein shall not be construed to relieve the Contractor from liability in excess of such coverage, nor shall it limit Contractor’s indemnification obligations to the City, and shall not preclude the City from taking such other actions available to the City under other provisions of the Contract Documents or law. c. Contractor shall make certain that any and all subcontractors hired by Contractor are insured in accordance with this Contract. If any subcontractor’s coverage does not comply with the foregoing provisions, Contractor shall indemnify and hold the City harmless from any damage, loss, cost, or expense, including attorneys’ fees, incurred by the City as a result thereof.
d. All general liability policies provided pursuant to the provisions of this Article shall comply with the provisions of the Contract Documents.
e. All general liability policies shall be written to apply to all bodily injury, including death, property damage, personal injury, owned and non-owned equipment, blanket contractual liability, completed operations liability, explosion, collapse, under-ground excavation, removal of lateral support, and other covered loss, however occasioned, occurring during the policy term, and shall specifically insure the performance by Contractor of that part of the indemnification contained in these General Conditions, relating to liability for injury to or death of persons and damage to property. If the coverage contains one or more aggregate limits, a minimum of 50% of any such aggregate limit must remain available at all times; if over 50% of any aggregate limit has been paid or reserved, the City may require additional coverage to be purchased by Contractor to restore the required limits. Contractor may combine primary, umbrella, and as broad as possible excess liability coverage to achieve the total limits indicated above. Any umbrella or excess liability policy shall include the additional insured endorsement described in the Contract Documents.

GC40. AUTOMOBILE LIABILITY INSURANCE
Contractor shall take out and maintain at all times during the term of this Contract Automobile Liability Insurance in the amount of, at least, one million dollars ($1,000,000).

Such insurance shall provide coverage for bodily injury and property damage including coverage for non-owned and hired vehicles, in a form and with insurance companies

Page 792 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
22 acceptable to the City. Such insurance shall comply with the provisions of Article 30 below.

GC41. BUILDER’S RISK [“ALL RISK”]
a. It is the Contractor’s responsibility to maintain or cause to be maintained Builder’s Risk [ “All Risk”] extended coverage insurance on all work, material, equipment, appliances, tools, and structures which are a part of the Contract and subject to loss or damage by fire, and vandalism and malicious mischief, in an amount to cover 100% of the replacement cost. The City accepts no responsibility until the Contract is formally accepted by the Governing Board for the work. The Contractor is required to file with the City a certificate evidencing fire insurance coverage. b. Provide insurance coverage on completed value form, all-risk or special causes of loss coverage.
1) Insurance policies shall be so conditioned as to cover the performance of any extra work performed under the Contract.
2) Coverage shall include all materials stored on site and in transit. 3) Coverage shall include Contractor’s tools and equipment. 4) Insurance shall include boiler, machinery and material hoist coverage. c. Such insurance shall comply with the provisions of the Contract Documents.

GC42. FORM AND PROOF OF CARRIAGE OF INSURANCE
a. Any insurance carrier providing insurance coverage required by the Contract Documents shall be admitted to and authorized to do business in the State of California unless waived, in writing, by the City Risk Manager. Carrier(s) shall have an A.M. Best rating of not less than an A:VIII. Insurance deductibles or self-insured retentions must be declared by the Contractor, and such deductibles and retentions shall have the prior written consent from the City. At the election of the City the Contractor shall either 1) reduce or eliminate such deductibles or self- insured retentions, or 2) procure a bond which guarantees payment of losses and related investigations, claims administration, and defense costs and expenses. b. Contractor shall cause its insurance carrier(s) to furnish the City with either 1) a properly executed original Certificates(s) of Insurance and certified original copies of Endorsements effecting coverage as required herein, or 2) if requested to do so in writing by the City Risk Manager, provide original Certified copies of policies including all Endorsements and all attachments thereto, showing such insurance is in full force and effect. The City, its Director’s and officers, employees, agents or representatives are named as Additional Insureds and Provide a Waiver of

Page 793 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
23 Subrogation in favor of those parties. Further, said Certificates(s) and policies of insurance shall contain the covenant of the insurance carrier(s) that shall provide no less than thirty (30) days written notice be given to the City prior to any material modification or cancellation of such insurance. In the event of a material modification or cancellation of coverage, the City may terminate or Stop Work pursuant to the Contract Documents, unless the City receives, prior to such effective date, another properly executed original Certificate of Insurance and original copies of endorsements or certified original policies, including all endorsements and attachments thereto evidencing coverages set forth herein and the insurance required herein is in full force and effect. Contractor shall not take possession, or use the Project site, or commence operations under this Agreement until the City has been furnished original Certificate(s) of Insurance and certified original copies of Endorsements or policies of insurance including all Endorsements and any and all other attachments as required in this Section. The original Endorsements for each policy and the Certificate of Insurance shall be signed by an individual authorized by the insurance carrier to do so on its behalf. c. It is understood and agreed to by the parties hereto and the insurance company(s), that the Certificate(s) of Insurance and policies shall so covenant and shall be construed as primary, and the City’s insurance and/or deductibles and/or self- insured retentions or self-insured programs shall not be construed as contributory. d. The City reserves the right to adjust the monetary limits of insurance coverage’s during the term of this Contract including any extension thereof-if in the City’s reasonable judgment, the amount or type of insurance carried by the Contractor becomes inadequate.
e. Contractor shall pass down the insurance obligations contained herein to all tiers of sub-contractors working under this Contract.

GC43. TIME FOR COMPLETION AND LIQUIDATED DAMAGES
a. Time for Completion/Liquidated Damages. Work shall be commenced within ten (10) days of the date stated in the City’s Notice to Proceed and shall be completed by Contractor in the time specified in the Contract Documents. The City is under no obligation to consider early completion of the Project; and the Contract completion date shall not be amended by the City’s receipt or acceptance of the Contractor’s proposed earlier completion date. Furthermore, Contractor shall not, under any circumstances, receive additional compensation from the City (including but not limited to indirect, general, administrative or other forms of overhead costs) for the period between the time of earlier completion proposed by the Contractor and the Contract completion date. If The Work is not completed as stated in the Contract Documents, it is understood that the City will suffer damage. In accordance with Government Code section 53069.85, being impractical and infeasible to determine the amount of actual damage, it is agreed that Contractor

Page 794 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
24 shall pay to the City as fixed and liquidated damages, and not as a penalty, the sum of $2,000 for each day of delay until The Work is fully completed. Contractor and its surety shall be liable for any liquidated damages. Any money due or to become due the Contractor may be retained to cover liquidated damages. b. Inclement Weather. Contractor shall abide the Engineer’s determination of what constitutes inclement weather. Time extensions for inclement weather shall only be granted when the Work stopped during inclement weather is on the critical path of the Project schedule.
c. Extension of Time. Contractor shall not be charged liquidated damages because of any delays in completion of The Work due to unforeseeable causes beyond the control and without the fault or negligence of Contractor (or its subcontractors or suppliers). Contractor shall within five (5) Days of identifying any such delay notify the City in writing of causes of delay. The City shall ascertain the facts and extent of delay and grant extension of time for completing The Work when, in its judgment, the facts justify such an extension. Time extensions to the Project shall be requested by the Contractor as they occur and without delay. No delay claims shall be permitted unless the event or occurrence delays the completion of the Project beyond the Contract completion date.
d. No Damages for Reasonable Delay. The City’s liability to Contractor for delays for which the City is responsible shall be limited to only an extension of time unless such delays were unreasonable under the circumstances. In no case shall the City be liable for any costs which are borne by the Contractor in the regular course of business, including, but not limited to, home office overhead and other ongoing costs. Damages caused by unreasonable City delay, including delays caused by items that are the responsibility of the City pursuant to Government Code section 4215, shall be based on actual costs only, no proportions or formulas shall be used to calculate any delay damages.

GC44. COST BREAKDOWN AND PERIODIC ESTIMATES
Contractor shall furnish on forms Approved by the City:
a. Within ten (10) Days of award of the Contract a detailed estimate giving a complete breakdown of the Contract price;
b. A monthly itemized estimate of Work done for the purpose of making progress payments. In order for the City to consider and evaluate each progress payment application, the Contractor shall submit a detailed measurement of Work performed and a progress estimate of the value thereof before the tenth (10th) Day of the following month.

Page 795 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
25 c. Contractor shall submit, with each of its payment requests, an adjusted list of actual quantities, verified by the Engineer, for unit price items listed, if any, in the Bid Form.
d. Following the City’s Acceptance of the Work, the Contractor shall submit to the City a written statement of the final quantities of unit price items for inclusion in the final payment request.
e. The City shall have the right to adjust any estimate of quantity and to subsequently correct any error made in any estimate for payment.

Contractor shall certify under penalty of perjury, that all cost breakdowns and periodic estimates accurately reflect the Work on the Project.

GC45. MOBILIZATION
a. When a bid item is included in the Bid Form for mobilization, the costs of Work in advance of construction operations and not directly attributable to any specific bid item will be included in the progress estimate (“Initial Mobilization”). When no bid item is provided for “Initial Mobilization,” payment for such costs will be deemed to be included in the other items of The Work.
b. Payment for Initial Mobilization based on the lump sum provided in the Bid Form, which shall constitute full compensation for all such Work. No payment for Initial Mobilization will be made until all of the listed items have been completed to the satisfaction of the Engineer. The scope of the Work included under Initial Mobilization shall include, but shall not be limited to, the following principal items:

1. Obtaining and paying for all bonds, insurance, and permits.

2. Moving on to the Project site of all Contractor’s plant and equipment required for first month’s operations.

3. Installing temporary construction power, wiring, and lighting facilities.

4. Establishing fire protection system.

5. Developing and installing a construction water supply.

6. Providing and maintaining the field office trailers for the Contractor and the Engineer, complete, with all specified furnishings and utility services including telephones, telephone appurtenances, computer and printer, and copying machine.

7. Providing on-site communication facilities for the Owner and the Engineer, including telephones, radio pagers, and fax machines.

Page 796 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
26 8. Providing on-site sanitary facilities and potable water facilities as specified per Cal-OSHA and these Contract Documents.

9. Furnishing, installing, and maintaining all storage buildings or sheds required for temporary storage of products, equipment, or materials that have not yet been installed in the Work. All such storage shall meet manufacturer’s specified storage requirements, and the specific provisions of the specifications, including temperature and humidity control, if recommended by the manufacturer, and for all security.

10. Arranging for and erection of Contractor’s work and storage yard, including required project signage.

11. Posting all OSHA required notices and establishment of safety programs per Cal-OSHA.

12. Full-time presence of Contractor’s superintendent at the job site as required herein.

13. Submittal of Construction Schedule as required by the Contract Documents.

GC46. PAYMENTS
a. The City shall make monthly progress payments following receipt of undisputed and properly submitted payment requests. Contractor shall be paid a sum equal to ninety percent (95%) of the value of Work performed up to the last day of the previous month, less the aggregate of previous payments. b. The Contractor shall, after the full completion of The Work, submit a final payment application. All prior progress estimates shall be subject to correction in the final estimate and payment.
c. Unless otherwise required by law, the final payment of five percent (5%) of the value of the Work, if unencumbered, shall be paid no later than sixty (35) Days after the date of recordation of the Notice of Completion. d. Acceptance by Contractor of the final payment shall constitute a waiver of all claims against the City arising from this Contract.
e. Payments to the Contractor shall not be construed to be an acceptance of any defective work or improper materials, or to relieve the Contractor of its obligations under the Contract Documents.
f. The Contractor shall submit with each payment request the Contractor’s conditional waiver of lien for the entire amount covered by such payment request, as well as a valid unconditional waiver of lien from the Contractor and all

Page 797 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
27 subcontractors and materialmen for all work and materials included in any prior invoices. Waivers of lien shall be in the forms prescribed by California Civil Code Section 3262. Prior to final payment by the City, the Contractor shall submit a final waiver of lien for the Contractor’s work, together with releases of lien from any subcontractor or materialmen.

GC47. PAYMENTS WITHHELD AND BACKCHARGES
In addition to amounts which the City may retain under other provisions of the Contract Documents the City may withhold payments due to Contractor as may be necessary to cover:
a. Stop Notice Claims.
b. Defective work not remedied.
c. Failure of Contractor to make proper payments to its subcontractors or suppliers. d. Completion of the Contract if there exists a reasonable doubt that the work can be completed for balance then unpaid.
e. Damage to another contractor or third party.
f. Amounts which may be due the City for claims against Contractor. g. Failure of Contractor to keep the record (“as-built”) drawings up to date. h. Failure to provide updates on the construction schedule. i. Site clean up.
j. Failure of the Contractor to comply with requirements of the Contract Documents. k. Liquated damages.
l. Legally permitted penalties.

Upon completion of the Contract, the City will reduce the final Contract amount to reflect costs charged to the Contractor, backcharges or payments withheld pursuant to the Contract Documents.

GC48. CHANGES AND EXTRA WORK
a. Change Order Work.
1) The City, without invalidating the Contract, may order changes in the Work consisting of additions, deletions or other revisions, the Contract amount

Page 798 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
28 and Contract time being adjusted accordingly. All such changes in the Work shall be authorized by Change Order, and shall be performed under the applicable conditions of the Contract Documents. A Change Order signed by the Contractor indicates the Contractor's agreement therewith, including any adjustment in the Contract amount or the Contract time, and the full and final settlement of all costs (direct, indirect and overhead) related to the Work authorized by the Change Order.
2) All claims for additional compensation to the Contractor shall be presented in writing before the expense is incurred and will be adjusted as provided herein. No work shall be allowed to lag pending such adjustment, but shall be promptly executed as directed, even if a dispute arises. No claim will be considered after the work in question has been done unless a written contract change order has been issued or a timely written notice of claim has been made by Contractor. Contractor shall not be entitled to claim or bring suit for damages, whether for loss of profits or otherwise, on account of any decrease or omission of any item or portion of Work to be done.

Whenever any change is made as provided for herein, such change shall be considered and treated as though originally included in the Contract, and shall be subject to all terms, conditions and provisions of the original Contract.
3) Owner Initiated Change. The Contractor must submit a complete cost proposal, including any change in the Contract time, within seven (7) Days after receipt of a scope of a proposed change order, unless the City requests that proposals be submitted in less than seven (7) Days. 4) Contractor Initiated Change. The Contractor must give written notice of a proposed change order required for compliance with the Contract Documents within seven (7) Days of discovery of the facts giving rise to the proposed change order.
5) Whenever possible, any changes to the Contract amount shall be in a lump sum mutually agreed to by the Contractor and the City.
6) Price quotations from the Contractor shall be accompanied by sufficiently detailed supporting documentation to permit verification by the City. 7) If the Contractor fails to submit the cost proposal within the seven (7) Day period (or as requested), the City has the right to order the Contractor in writing to commence the work immediately on a force account basis and/or issue a lump sum change to the contract price in accordance with the City’s estimate of cost. If the change is issued based on the City estimate, the Contractor will waive its right to dispute the action unless within fifteen (15)

Page 799 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
29 Days following completion of the added/deleted work, the Contractor presents written proof that the City’s estimate was in error. 8) Estimates for lump sum quotations and accounting for cost-plus-percentage work shall be limited to direct expenditures necessitated specifically by the subject extra work, and shall be segregated as follows:
(a) Labor. The costs of labor will be the actual cost for wages prevailing locally for each craft or type of worker at the time the extra work is done, plus employer payments of payroll taxes and insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State or local laws, as well as assessment or benefits required by lawful collective bargaining agreements. The use of a labor classification which would increase the extra work cost will not be permitted unless the contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental. (b) Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available in the quantities involved, plus sales tax, freight and delivery. Materials cost shall be based upon supplier or manufacturer’s invoice. If invoices or other satisfactory evidence of cost are not furnished within fifteen (15) Days of delivery, then the Engineer shall determine the materials cost, at its sole discretion.
(c) Tool and Equipment Use. No payment will be made for the use of small tools, tools which have a replacement value of $1,000 or less.

Regardless of ownership, the rates to be used in determining equipment use costs shall not exceed listed rates prevailing locally at equipment rental agencies, or distributors, at the time the work is performed.
(d) Overhead, Profit and Other Charges. The mark-up for overhead (including supervision) and profit on work added to the Contract shall be according to the following:
i. “Net Cost” is defined as consisting of costs of labor, materials and tools and equipment only excluding overhead and profit. The costs of applicable insurance and bond premium will be reimbursed to the Contractor and
subcontractors at cost only, without mark-up.

Page 800 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
30 ii. For Work performed by the Contractor’s forces the added cost for overhead and profit shall not exceed fifteen (15%) percent of the Net Cost of the Work.
iii. For Work performed by a subcontractor, the added cost for overhead and profit shall not exceed fifteen (15%) percent of the Net Cost of the Work to which the Contractor may add five (5%) percent of the subcontractor’s Net Cost.
iv. For Work performed by a sub-subcontractor the added cost for overhead and profit shall not exceed fifteen (15 %) percent of the Net Cost for Work to which the subcontractor and general contractor may each add an additional five (5 %) percent of the Net Cost of the lower tier subcontractor. iv. No additional mark up will be allowed for lower tier subcontractors, and in no case shall the added cost for overhead and profit payable by City exceed twenty-five
(25%) percent of the Net Cost as defined herein.
9) For added or deducted Work by subcontractors, the Contractor shall furnish to the City the subcontractor’s signed detailed estimate of the cost of labor, material and equipment, including the subcontractor markup for overhead and profit. The same requirement shall apply to sub-subcontractors. 10) For added or deducted work furnished by a vendor or supplier, the Contractor shall furnish to the City a detailed estimate or quotation of the cost to the Contractor, signed by such vendor or supplier. 11) Any change in The Work involving both additions and deletions shall indicate a net total cost, including subcontracts and materials. Allowance for overhead and profit, as specified herein, shall be applied if the net total cost is an extra; overhead and profit allowances shall not be applied if the net total cost is a credit. The estimated cost of deductions shall be based on labor and material prices on the date the Contract was executed. 12) Contractor shall not reserve a right to assert impact costs, extended job site costs, extended overhead, constructive acceleration and/or actual acceleration beyond what is stated in the change order for work. No claims shall be allowed for impact, extended overhead costs, constructive acceleration and/or actual acceleration due to a multiplicity of changes and/or clarifications. The Contractor may not change or modify the City’s change order form in an attempt to reserve additional rights. 13) If the City disagrees with the proposal submitted by Contractor, it will notify the Contractor and the City will provide its opinion of the appropriate price

Page 801 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
31 and/or time extension. If the Contractor agrees with the City, a change order will be issued by the City. If no agreement can be reached, the City shall have the right to issue a unilateral change order setting forth its determination of the reasonable additions or savings in costs and time attributable to the extra or deleted work. Such determination shall become final and binding if the Contractor fails to submit a claim in writing to the City within fifteen (15) Days of the issuance of the unilateral change order, disputing the terms of the unilateral change order.
14) No dispute, disagreement or failure of the parties to reach agreement on the terms of the change order shall relieve the Contractor from the obligation to proceed with performance of the work, including extra work, promptly and expeditiously.
15) Any alterations, extensions of time, extra work or any other changes may be made without securing consent of the Contractor’s surety or sureties.

GC49. OCCUPANCY
The City reserves the right to occupy or utilize any portion of The Work at any time before completion, and such occupancy or use shall not constitute Acceptance of any part of Work covered by this Contract. This use shall not relieve the Contractor of its responsibilities under the Contract.

GC50. INDEMNIFICATION
Contractor shall defend (with counsel of City’s choosing), indemnify and hold the City, its officials, officers, agents, employees, and representatives free and harmless from any and all claims, demands, causes of action, costs, expenses, liabilities, losses, damages or injuries, in law or equity, regardless of whether the allegations are false, fraudulent, or groundless, to property or persons, including wrongful death, to the extent arising out of or incident to any acts, omissions or willful misconduct of Contractor, its officials, officers, employees, agents, consultants and contractors arising out of or in connection with the performance of the Work or this Contract, including claims made by subcontractors for nonpayment, including without limitation the payment of all consequential damages and attorney’s fees and other related costs and expenses. Contractor shall defend, at Contractor’s own cost, expense and risk, with counsel of City’s choosing, any and all such aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against City, its officials, officers, agents, employees and representatives. To the extent of its liability, Contractor shall pay and satisfy any judgment, award or decree that may be rendered against City, its officials, officers, employees, agents, employees and representatives, in any such suit, action or other legal proceeding. Contractor shall reimburse City, its officials, officers, agents, employees and representatives for any and all legal expenses and costs incurred by each of them in connection therewith or in

Page 802 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
32 enforcing the indemnity herein provided. The only limitations on this provision shall be those imposed by Civil Code Section 2782.

GC51. RECORD (“AS BUILT”) DRAWINGS
a. Contractor shall prepare and maintain a complete set of record drawings (herein referred to as “as-builts”) and shall require each trade to prepare its own as-builts.

The as-builts must show the entire site for each major trade, including but not limited to water, sewer, electrical, data, telephone, cable, fire alarm, gas and plumbing. Contractor shall mark the as-builts to show the actual installation where the installation varies from the Work as originally shown. Contractor shall mark whichever drawings are most capable of showing conditions fully and where shop drawings are used, Contractor must record a cross-reference at the corresponding location on the contract drawings. Contractor shall give particular attention to concealed elements that would be difficult to measure and record at a later date.

Contractor shall use colors to distinguish variations in separate categories of The Work.
b. Contractor shall note related change order numbers where applicable. Contractor shall organize as-builts into manageable sets, bound with durable paper cover sheets and shall print suitable title, dates and other identification on the cover of each set. Contractor to also provide an electronic version of the as-builts. The suitability of the as-builts will be determined by the Engineer.

GC52. RESOLUTION OF CONSTRUCTION CLAIMS
a. In accordance with Public Contract Code Sections 20104 et seq. and other applicable law, public works claims of $375,000 or less which arise between the Contractor and the City shall be resolved under the following the statutory procedure unless the City has elected to resolve the dispute pursuant to Public Contract Code Section 10240 et seq.
b. All Claims: All claims shall be submitted in writing and accompanied by substantiating documentation. Claims must be filed on or before the date of final payment unless other notice requirements are provided in the contract. "Claim" means a separate demand by the claimant for (1) a time extension, (2) payment of money or damages arising from work done by or on behalf of the claimant and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled, or (3) an amount the payment of which is disputed by the City. c. Claims Under $50,000. The City shall respond in writing to the claim within 45 days of receipt of the claim, or, the City may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses or claims the City may have. If additional information is needed thereafter, it shall be provided upon mutual agreement of the City and the claimant.

The City's written response shall be submitted 15 days after receiving the

Page 803 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
33 additional documentation, or within the same period of time taken by the claimant to produce the additional information, whichever is greater. d. Claims over $50,000 but less than or equal to $375,000. The City shall respond in writing within 60 days of receipt, or, may request in writing within 30 days of receipt of the claim, any additional documents supporting the claim or relating to defenses or claims the City may have against the claimant. If additional information is needed thereafter, it shall be provided pursuant to mutual agreement between the City and the claimant. The City's response shall be submitted within 30 days after receipt of the further documents, or within the same period of time taken by the claimant to produce the additional information or documents, whichever is greater. The Contractor shall make these records and documents available at all reasonable times, without any direct charge. e. The Contractor will submit the claim justification in the following format:
1) Summary of claim merit and price, and Contract clause pursuant to which the claim is made.
2) List of documents relating to claim
(a) Specifications
(b) Drawings
(c) Clarifications (Requests for Information)
(d) Schedules
(e) Other
3) Chronology of events and correspondence
4) Analysis of claim merit
5) Analysis of claim cost
6) Analysis of time impact analysis in CPM format
7) Cover letter and certification of validity of the claim f. If the claimant disputes the City's response, or if the City fails to respond within the statutory time period(s), the claimant may so notify the City within 15 days of the receipt of the response or the failure to respond, and demand an informal conference to meet and confer for settlement. Upon such demand, the City shall schedule a meet and confer conference within 30 Days.

Page 804 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
34 g. If following the meet and confer conference, the claim or any portion thereof remains in dispute, the claimant may file a claim pursuant to Government Code 900 et seq. and Government Code 910 et seq. For purposes of those provisions, the time within which a claim must be filed shall be tolled from the time the claimant submits the written claim until the time the claim is denied, including any time utilized for the meet and confer conference.
h. Submission of a claim, properly certified, with all required supporting documentation, and written rejection or denial of all or part of the claim by City, is a condition precedent to any action, proceeding, litigation, suit, general conditions claim, or demand for arbitration by Contractor.

GC53. CITY’S RIGHT TO TERMINATE CONTRACT
a. Termination for Cause: The City may, without prejudice to any other right or remedy, serve written notice upon Contractor of its intention to terminate this Contract if the Contractor: (i) refuses or fails to prosecute The Work or any part thereof with such diligence as will ensure its completion within the time required; (ii) fails to complete The Work within the required time; (iii) should file a bankruptcy petition or be adjudged a bankrupt; (iv) should make a general assignment for the benefit of its creditors; (v) should have a receiver appointed; (vi) should persistently or repeatedly refuse or fail to supply enough properly skilled workers or proper materials to complete the work; (vii) should fail to make prompt payment to subcontractors or for material or labor; (viii) persistently disregard laws, ordinances, other requirements or instructions of the City; or (ix) should violate any of the provisions of the Contract Documents.

The notice of intent to terminate shall contain the reasons for such intention to terminate. Unless within ten (10) Days after the service of such notice, such condition shall cease or satisfactory arrangements (acceptable to the City) for the required correction are made, this Contract shall be terminated. In such case, Contractor shall not be entitled to receive any further payment until the Project has been finished. The City may take over and complete The Work by any method it may deem appropriate. Contractor and its surety shall be liable to the City for any excess costs or other damages incurred by the City to complete the Project. If the City takes over The Work, the City may, without liability for so doing, take possession of and utilize in completing The Work such materials, appliances, plant, and other property belonging to the Contractor as may be on the Project site. b. Termination For Convenience: The City may terminate performance of The Work in whole or, in part, if the City determines that a termination is in the City's interest.

The Contractor shall terminate all or any part of The Work upon delivery to the Contractor of a Notice of Termination specifying that the termination is for the

Page 805 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
35 convenience of the City, the extent of termination, and the effective date of such termination.

After receipt of Notice of Termination, and except as directed by the City, the Contractor shall, regardless of any delay in determining or adjusting any amounts due under this Termination for Convenience clause, immediately proceed with the following obligations:
1) Stop Work as specified in the Notice.
2) Complete any Work specified in the Notice of Termination in a least cost/shortest time manner while still maintaining the quality called for under the Contract Documents.
3) Leave the property upon which the Contractor was working and upon which the facility (or facilities) forming the basis of the Contract Documents is situated in a safe and sanitary manner such that it does not pose any threat to the public health or safety. 4) Terminate all subcontracts to the extent that they relate to the portions of The Work terminated.
5) Place no further subcontracts or orders, except as necessary to complete the remaining portion of The Work.
6) Submit to the City, within ten (10) Days from the effective date of the Notice of Termination, all of the documentation called for by the Contract Documents to substantiate all costs incurred by the Contractor for labor, materials and equipment through the Effective Date of the Notice of Termination. Any documentation substantiating costs incurred by the Contractor solely as a result of the City's exercise of its right to terminate this Contract pursuant to this clause, which costs the Contractor is authorized under the Contract Documents to incur, shall: (i) be submitted to and received by the City no later than thirty (30) Days after the Effective Date of the Notice of Termination; (ii) describe the costs incurred with particularity; and (iii) be conspicuously identified as "Termination Costs Occasioned by the City's Termination for Convenience." 7) These provisions are in addition to and not in limitation of any other rights or remedies available to the City.
c. Notwithstanding any other provision of this Article, when immediate action is necessary to protect life and safety or to reduce significant exposure or liability, the City may immediately order Contractor to cease Work on the Project until such

Page 806 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
36 safety or liability issues are addressed to the satisfaction of the City or the Contract is terminated.

GC54. WARRANTY AND GUARANTEE
a. Contractor warrants that all materials and equipment furnished under this Contract shall be new unless otherwise specified in the Contract Documents; and that all Work conforms to the Contract Document requirements and is free of any defect whether performed by the Contractor or any subcontractor or supplier. b. Unless otherwise stated, all warranty periods shall begin upon the filing of the Notice of Completion. Unless otherwise stated, the warranty period shall be for one year.
c. The Contractor shall remedy at its expense any damage to City-owned or controlled real or personal property.
d. Contractor shall furnish the City with all warranty and guarantee documents prior to final Acceptance of the Project by the City.
e. The City shall notify the Contractor, in writing, within a reasonable time after the discovery of any failure, defect, or damage. The Contractor shall within ten (10) Days after being notified commence and perform with due diligence all necessary Work. If the Contractor fails to promptly remedy any defect, or damage; the county shall have the right to replace, repair, or otherwise remedy the defect, or damage at the Contractor’s expense.
f. In the event of any emergency constituting an immediate hazard to health, safety, property, or licensees, when caused by Work of the Contractor not in accordance with the Contract requirements, the City may undertake at Contractor’s expense, and without prior notice, all Work necessary to correct such condition. g. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for Work performed and Materials furnished under this Contract, the Contractor shall:
1) Obtain for City all warranties that would be given in normal commercial practice;
2) Require all warranties to be executed, in writing, for the benefit of the City; and
3) Enforce all warranties for the benefit of the City, unless otherwise directed in writing by the City.

Page 807 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
37 This Article shall not limit the City’s rights under this Contract or with respect to latent defects, gross mistakes, or fraud. The City specifically reserves all rights related to defective work, including but not limited to the defect claims pursuant to California Code of Civil Procedure Section 337.15.

GC55. DOCUMENT RETENTION & EXAMINATION
a. In accordance with Government Code Section 8546.7, records of both the City and the Contractor shall be subject to examination and audit by the State Auditor General for a period of three (3) years after final payment. b. Contractor shall make available to the City any of the Contractor’s other documents related to the Project immediately upon request of the City. c. In addition to the State Auditor rights above, the City shall have the right to examine and audit all books, estimates, records, contracts, documents, bid documents, subcontracts, and other data of the Contractor (including computations and projections) related to negotiating, pricing, or performing the modification in order to evaluate the accuracy and completeness of the cost or pricing data at no additional cost to the City, for a period of four (4) years after final payment.

GC56. SOILS INVESTIGATIONS
When a soils investigation report for the Project site is available, such report shall not be a part of the Contract Documents. Any information obtained from such report as to subsurface soil condition, or to elevations of existing grades or elevations of underlying rock, is approximate only and is not guaranteed. Contractor acknowledges that any soils investigation report (including any borings) was prepared for purposes of design only and Contractor is required to examine the site before submitting its bid and must make whatever tests it deems appropriate to determine the underground condition of the soil.

GC57. SEPARATE CONTRACTS
a. The City reserves the right to let other contracts in connection with this Work or on the Project site. Contractor shall permit other contractors reasonable access and storage of their materials and execution of their work and shall properly connect and coordinate its Work with theirs.
b. To ensure proper execution of its subsequent Work, Contractor shall immediately inspect work already in place and shall at once report to the Engineer any problems with the work in place or discrepancies with the Contract Documents. c. Contractor shall ascertain to its own satisfaction the scope of the Project and nature of any other contracts that have been or may be awarded by the City in prosecution of the Project to the end that Contractor may perform this Contract in the light of such other contracts, if any. Nothing herein contained shall be

Page 808 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
38 interpreted as granting to Contractor exclusive occupancy at site of the Project.

Contractor shall not cause any unnecessary hindrance or delay to any other contractor working on the Project. If simultaneous execution of any contract for the Project is likely to cause interference with performance of some other contract or contracts, the Engineer shall decide which Contractor shall cease Work temporarily and which contractor shall continue or whether work can be coordinated so that contractors may proceed simultaneously. The City shall not be responsible for any damages suffered or for extra costs incurred by Contractor resulting directly or indirectly from award, performance, or attempted performance of any other contract or contracts on the Project site.

GC58. NOTICE AND SERVICE THEREOF
All notices shall be in writing and either served by personal delivery or mailed to the other party as designated in the Bid Forms. Written notice to the Contractor shall be addressed to Contractor’s principal place of business unless Contractor designates another address in writing for service of notice. Notice to City shall be addressed to the City as designated in the Notice Inviting Bids unless City designates another address in writing for service of notice. Notice shall be effective upon receipt or five (5) Days after being sent by first class mail, whichever is earlier. Notice given by facsimile shall not be effective unless acknowledged in writing by the receiving party.

GC59. NOTICE OF THIRD PARTY CLAIMS
Pursuant to Public Contract Code Section 9201, the City shall provide Contractor with timely notification of the receipt of any third-party claim relating to the Contract.

GC60. STATE LICENSE BOARD NOTICE.

Contractors are required by law to be licensed and regulated by the Contractors’ State License Board which has jurisdiction to investigate complaints against contractors if a complaint regarding a patent act or omission is filed within four (4) years of the date of the alleged violation. A complaint regarding a latent act or omission pertaining to structural defects must be filed within ten (10) years of the date of the alleged violation.

Any questions concerning a contractor may be referred to the Registrar, Contractors’ State License Board, P.O. Box 26000, Sacramento, California 95826.

GC61. INTEGRATION
a. Oral Modifications Ineffective. No oral order, objection, direction, claim or notice by any party or person shall affect or modify any of the terms or obligations contained in the Contract Documents.
b. Contract Documents Represent Entire Contract. The Contract Documents represent the entire agreement of the City and Contractor.

Page 809 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
39 GC62. ASSIGNMENT
Contractor shall not assign, transfer, convey, sublet, or otherwise dispose of this Contract or any part thereof including any claims, without prior written consent of the City. Any assignment without the written consent of the City shall be void. Any assignment of money due or to become due under this Contract shall be subject to a prior lien for services rendered or Material supplied for performance of Work called for under the Contract Documents in favor of all persons, firms, or corporations rendering such services or supplying such Materials to the extent that claims are filed pursuant to the Civil Code, the Code of Civil Procedure or the Government Code.

GC63. CHANGE IN NAME AND NATURE OF CONTRACTOR’S LEGAL
ENTITY
Should a change be contemplated in the name or nature of the Contractor’s legal entity, the Contractor shall first notify the City in order that proper steps may be taken to have the change reflected on the Contract.

GC64. ASSIGNMENT OF ANTITRUST ACTIONS
Pursuant to Section 7103.5 of the Public Contract Code, in entering into a public works contract or subcontract to supply goods, services, or materials pursuant to a public works contract, Contractor or subcontractor offers and agrees to assign to the City all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Section 15) or under the Cartwright Act (chapter 2 (commencing with Section 16700) of part 2 of division 7 of the Business and Professions Code), arising from the purchase of goods, services, or materials pursuant to this Contract or any subcontract.

This assignment shall be made and become effective at the time the City makes final payment to the Contractor, without further acknowledgment by the parties.

GC65. PROHIBITED INTERESTS
No City official or representative who is authorized in such capacity and on behalf of the City to negotiate, supervise, make, accept, or approve, or to take part in negotiating, supervising, making, accepting or approving any engineering, inspection, construction or material supply contract or any subcontract in connection with construction of the project, shall be or become directly or indirectly interested financially in the Contract.

GC66. LAWS AND REGULATIONS
a. Contractor shall give all notices and comply with all federal, state and local laws, ordinances, rules and regulations bearing on conduct of work as indicated and specified by their terms. References to specific laws, rules or regulations in this Contract are for reference purposes only, and shall not limit or affect the applicability of provisions not specifically mentioned. If Contractor observes that drawings and specifications are at variance therewith, he shall promptly notify the

Page 810 of 1492 ends

City of Beaumont
General Conditions Mesa Lift Station Force Main
CIP WW-09

GENERAL CONDITIONS
40 Engineer in writing and any necessary changes shall be adjusted as provided for in this Contract for changes in work. If Contractor performs any work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the Engineer, he shall bear all costs arising therefrom. b. Contractor shall be responsible for familiarity with the Americans with Disabilities Act (“ADA”) (42 U.S.C. § 12101 et seq.). The Work will be performed in compliance with ADA laws, rules and regulations. Contractor shall comply with the Historic Building Code, including, but not limited to, as it relates to the ADA, whenever applicable.
c. Contractor acknowledges and understands that, pursuant to Public Contract Code Section 20676, sellers of "mined material" must be on an approved list of sellers published pursuant to Public Resources Code Section 2717(b) in order to supply mined material for this Contract.

GC67. PATENT FEES OR ROYALTIES.

The Contractor shall include in its bid amount the patent fees or royalties on any patented article or process furnished or used in the Work. Contractor shall assume all liability and responsibility arising from the use of any patented, or allegedly patented, materials, equipment, devices or processes used in or incorporated with The Work, and shall defend, indemnify and hold harmless the City, its officials, officers, agents, employees and representatives from and against any and all liabilities, demands, claims, damages, losses, costs and expenses, of whatsoever kind or nature, arising from such use.

GC68. OWNERSHIP OF DRAWING
All Contract Documents furnished by the City are City property. They are not to be used by Contractor or any subcontractor on other work nor shall Contractor claim any right to such documents. With exception of one complete set of Contract Documents, all documents shall be returned to the City on request at completion of The Work.

GC69. NOTICE OF TAXABLE POSSESSORY INTEREST
In accordance with Revenue and Taxation Code Section 107.6, the Contract Documents may create a possessory interest subject to personal property taxation for which Contractor will be responsible.

Page 811 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

39 03 SPECIAL CONDITIONS
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

Page 812 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
1 SPECIAL CONDITIONS

TABLE OF CONTENTS
SC-01. CONSTRUCTION WATER AND DUST CONTROL. ........................................... 1 SC-02. PRECONSTRUCTION PHOTOS AND VIDEO. .................................................. 1 SC-03. COORDINATION WITH THE PUBLIC ................................................................ 1 SC-04. REFERENCED DRAWINGS AND DETAILED PROVISIONS. ............................ 1 SC-05. CONSTRUCTION SOILS TESTING. .................................................................. 1 SC-06. MITIGATION MONITORING AND REPORTING PROGRAM ............................. 1 SC-07. CALTRANS PERMIT AND COORDINATION. .................................................... 3 SC-08. COORDINATION WITH LIFT STATION CONTRACTOR. .................................. 3 SC-09. COORDINATION WITH HPG PIPELINE OWNER. ............................................. 3 SC-10. CONTRACTOR STAGING AREA/MATERIAL STORAGE AREA. ...................... 3 SC-11. PRESSURE TESTING OF INSTALLED PIPELINE. ........................................... 4 SC-12. PRESSURE TESTING OF EXISTING PIPELINE. .............................................. 4 SC-13. CONSTRUCTION STAKING............................................................................... 4 SC-14. PAVEMENT RESTORATION. ............................................................................. 5 SC-15. PROTECTION OF EXISTING 12-IN FORCE MAIN. ........................................... 5 SC-16. POTHOLING OF EXISTING UTILITIES BY CONTRACTOR. ............................. 6 SC-17. DATA TO BE SUBMITTED BY CONTRACTOR. ................................................ 7 SC-18. FITTINGS AND GRADE BREAKS. ..................................................................... 8 SC-19. INSPECTOR’S FIELD OFFICE. .......................................................................... 8 SC-20. PROJECT MEETINGS. ....................................................................................... 8 SC-21. RECESSED PLATES. ......................................................................................... 8 SC-22. ENCROACHMENT PERMIT. .............................................................................. 8 SC-23. CONTRACTOR RED-LINED DRAWINGS. ......................................................... 9 SC-24. DEFINITION OF BID ITEMS. .............................................................................. 9 SC-25. NOTIFICATION OF RESIDENTS AND BUSINESSES. .................................... 10 SC-26. SOUND REQUIREMENTS. .............................................................................. 11 SC-27. MOBILIZATION, DEMOBILIZATION AND INSURANCE. ................................. 11 SC-28. MOBILIZATION, DEMOBILIZATION AND INSURANCE. ................................. 12 SC-29. GUARANTEE. ................................................................................................... 12 SC-30. TRAFFIC STRIPING AND PAVEMENT MARKINGS ........................................ 12 SC-31. TRAFFIC CONTROL. ....................................................................................... 13

Page 813 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
1 SC-01. CONSTRUCTION WATER AND DUST CONTROL. The contractor is responsible for providing all arrangements for construction water and to have a sufficient supply of construction water for the project. Contractor shall comply with South Coast Air Quality Management District Rule 403 – Fugitive Dust. Contractor shall use water trucks or other means to actively prevent, reduce, and mitigate dust emissions using the best available control measures as referenced in Rule 403.

SC-02. PRECONSTRUCTION PHOTOS AND VIDEO. The Contractor shall take preconstruction photos of the entire project site and shall prepare a full color pre- construction video recording of the project site with the Inspector present prior to mobilizing. Photos and video shall be submitted to the City for review and acceptance.

SC-03. COORDINATION WITH THE PUBLIC. If the City receives complaints from individuals or agencies affected by the project; the Contractor shall take immediate action to correct the situation as directed by the City. If the Contractor receives complaints directly, the Contractor shall immediately notify the City Inspector. Thereafter, the Contractor shall take immediate action to correct the situation as directed by the City.

SC-04. REFERENCED DRAWINGS AND DETAILED PROVISIONS. Any and all referenced Standard Drawings and Detailed Provisions, including City, County, or any other details or standards referenced in the contract documents shall be considered part of the contract drawings and specifications. The Contractor shall not be entitled to any compensation due to referenced documents not included in the Specifications and Contract Drawings.

SC-05. CONSTRUCTION SOILS TESTING. Geotechnical observation and compaction testing is required during all grading, earthwork, backfill and compaction activities. The City shall provide this testing through a third-party geotechnical professional. The contractor shall coordinate with the geotechnical professional for all required field observation and testing and provide sufficient time to respond to requests. Any required re-compaction or re-installation of fill material as determined by the geotechnical professional shall be performed at no additional cost to the City. No additional compensation shall be provided due to delays resulting from late or insufficient coordination with the geotechnical professional.

SC-06. MITIGATION MONITORING AND REPORTING PROGRAM. An Initial Study and Mitigated Negative Declaration (IS/MND) was prepared for this project in conformance with the California Environmental Quality Act (CEQA). A copy of the Mitigation Monitoring and Reporting Program (MMRP) is provided in the Appendices to these specifications.

The contractor is responsible for implementation and compliance with the mitigation measures as described in the MMRP. A summary of mitigation responsibilities is provided as follows:

Page 814 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
2 • BIO-1: Biological Resources Worker Environmental Awareness Program – Contractor shall provide time for training of each crew working on the project. The Contractor will provide the project biologist to prepare and perform the training. • BIO-2: Preconstruction Surveys – The Contractor is responsible to provide a project biologist for the preconstruction surveys if work must be done during the breeding season (March 1 through August 31) and to flag any special status species to be avoided during construction. The Contractor shall provide a construction schedule and coordinate with the Construction Manager to ensure the surveys are completed prior to construction.
• BIO-7: Work in Jurisdictional Waters – The project has been designed to avoid impacts to wetlands and jurisdictional waters. Contractor is responsible maintain his operations within the public rights-of-way and outside wetlands or jurisdictional waters.
• BIO-8: Pre-Construction Burrowing Owl Survey – The Contractor is responsible to provide a project biologist for the preconstruction burrowing owl survey within 30-days prior to construction. The Contractor shall provide a construction schedule and coordinate with the Construction Manager to ensure the surveys are completed prior to construction.
• CR-1: Archeological and Native American Monitors - The Contractor is responsible to provide the tribal monitor. Contractor is responsible to communicate with a qualified archeologist in accordance with the MMRP requirements if archeological cultural resource or Native American cultural resources are discovered during project activities. Contractor shall cease earthwork operations and implement archeologist recommendations if this occurs. • CR-2: Worker’s Environmental Awareness Training - The Contractor is responsible to provide the tribal monitor to train contractor crews. Contractor shall provide time for training of each crew working on the project. • CR-5: Inadvertent Discovery of Human Remains – If human remains are discovered during project activities, Contractor is responsible for complying with the MMRP requirements.
• PALEO-1: Paleontological Resources Worker’s Environmental Awareness Training - The Contractor is responsible to provide the paleontologist to train contractor crews. Contractor shall provide time for training of each crew working on the project.
• PALEO-2: Paleontological Resources Mitigation Monitoring Plan and Monitoring- The Contractor is responsible to provide the paleontologist. Contractor is responsible for complying with the MMRP requirements.
• PALEO-3: Paleontological Resources Discovery - The Contractor is responsible to provide the paleontologist. Contractor is responsible for complying with the MMRP requirements.
• NOI-1: Equipment Maintenance – Contractor is responsible in accordance with the MMRP requirements.
• NOI-2: Idling Engines - Contractor is responsible in accordance with the MMRP requirements.

Page 815 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
3 • TRANS-1: Traffic Control Plans - Contractor is responsible for preparing and implementing traffic control plans in accordance with the MMRP requirements.

Payment for MMRP compliance for BIO-1, BIO-2, BIO-8, CR-1, CR-2, PALEO-1, PALEO- 2 and TRANS-1 is provided in the bid schedule and described further in these specifications. All other requirements of the MMRP and CEQA not paid for as a separate bid item shall be included in the Contractor’s bid prices and be considered as included in the prices paid for all other items of work. No additional compensation will be allowed.

SC-07. CALTRANS PERMIT AND COORDINATION. The City has coordinated the project and proposed work with Caltrans. The proposed work is outside of Caltrans existing rights-of-way; however, some work stages will impact traffic using the westbound SR-60 on and off ramps. The contractor is responsible for preparing and coordinating Caltrans approval of the temporary traffic control plans that will impact the westbound SR- 60 on and off ramps. All costs for complying with the Caltrans requirements shall be included in the Contractor’s bid price and no additional compensation will be allowed. The City will pay any plan review fees, permit fees and inspection costs imposed by Caltrans.

SC-08. COORDINATION WITH LIFT STATION CONTRACTOR. The City will or has engaged a separate contractor to construct improvements at the existing Beaumont Mesa Lift Station. The Contractor shall cooperate with the construction manager and the contractor for the lift station in implementing the proposed force main work. No additional compensation shall be provided due to reasonable changes in the work schedule for work associated with the lift station.

SC-09. COORDINATION WITH HPG PIPELINE OWNER. The proposed alignment crosses the Questar Southern Trails pipeline (owned and operated by Dominion Energy) in two places, on Potrero Blvd at STA 24+71.77 and on Western Knolls Avenue at STA 43+50.04. The Contractor must pothole these two crossing points at least four week prior to pipeline installation. Before any construction activity near this pipeline (potholing, excavation, trenching), the Contractor must notify the pipeline owner at least three days prior to start of such construction activity. It is anticipated that an observer from the pipeline company will be on site during such activities. Note that NO MECHANICAL EQUIPMENT is allowed to operate with three horizontal feet and two vertical feet of the pipeline. Any closer work must be performed by hand. All costs for complying with the requirements of this pipeline owner shall be included in the Contractor’s bid price and no additional compensation will be allowed.

SC-10. CONTRACTOR STAGING AREA/MATERIAL STORAGE AREA. There is no specific contractor staging area or material storage area identified for this project. It is anticipated that no equipment or material can be stored within the right-of-way outside of the special work hours identified for this project. It is the Contractor’s responsibility to locate and contract for a suitable staging area, material storage area and/or contractor yard in order to effectively execute the Contract work. All costs for this task shall be included in the bid proposal and no additional compensation will be allowed.

Page 816 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
4 SC-11. PRESSURE TESTING OF INSTALLED PIPELINE. The Contractor is responsible for furnishing, installing and removing all required equipment including water, valves, bulkheads, pumps, piping, meters, backflow device as needed for pressure testing of the force main. All pipelines installed shall be tested at 1.5 times the pipe class. Any water that the Contractor flushes to local storm drains shall be dechlorinated by the Contractor.

The Contractor is required to submit a pressure testing plan to the Engineer for review and approval. Any costs associated with pressure testing shall be included in the bid price and no additional compensation will be allowed.

SC-12. PRESSURE TESTING OF EXISTING PIPELINE. The Contractor is responsible for furnishing, installing and removing all required equipment including water, valves, bulkheads, pumps, piping, meters, backflow device as needed for pressure testing of a portion of the 16-in existing force main. The details of this testing are given in Appendix H. Any water used in conjunction with this testing that the Contractor flushes to local storm drains shall be dechlorinated by the Contractor. The Contractor is required to submit a pressure testing plan to the Engineer for review and approval.

Also included in this item of work is for the Contractor to provide a video inspection of a portion of the existing 16-in force main to identify the extent of the existing pipeline and the connection point for the proposed pipeline. This work shall be done as part of the initial work of the contract prior to confirming the final quantity of 16-in PVC pipe to purchase for the project. See Appendix H for additional details. Any costs associated with pressure testing shall be included in the bid price and no additional compensation will be allowed.

SC-13. CONSTRUCTION STAKING. The City will provide pre-construction staking at every vertical and horizontal angle point and at 200 foot intervals along the proposed pipeline alignment to assist Contractor in the pre-construction video and potholing. Upon completion of the potholing, review of field data, modifications to the alignment and pipeline submittals, the City will provide construction staking for the pipeline and appurtenances. One (1) set of stakes will be provided at 25-foot +/- intervals and at all angle points, connections, and appurtenances in accordance with the pipeline drawings.

Any costs for re-staking due to stakes lost during construction shall be paid for by the Contractor.

The Contractor shall notify City’s Surveyor at least 72 hours in advance when requesting staking. Saturdays, Sundays and holidays shall not be considered as including any portion of the 72-hour advance notice. The Contractor shall specify the portion of staking to be done for each request. The Contractor has been allocated four survey requests for this project, including the pre-construction staking. Any additional staking requests shall be paid for by the Contractor. The City will provide the survey request form and contact information at the pre-construction meeting.

Page 817 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
5 SC-14. PAVEMENT RESTORATION.

A. General
The Contractor shall return the site to pre-construction conditions as close as practical.

Contractor shall be responsible to repair and restore the existing pavement as applicable.

Contractor shall inspect the existing pavement prior to preparation of Bid. Contractor shall repair any pavement damaged by this operation. The Contractor shall restore the pavement per the requirements set forth in Trench Repair Details and the attached technical specifications or as required by the City, whichever is more stringent.

B. Existing Pavement And Paving Replacement
Cutting, removal and replacement of the existing asphalt concrete (AC) pavement shall be in accordance with the technical paving specifications and the permit provisions of the agency having jurisdiction over the right-of-way; and the highest and most stringent requirement or criteria shall govern the AC removal and replacement.

For bid quantity estimating purposes, the weighted average thickness calculations for the pavement section shall be as follows:

1. AC Pavement: 6.0 inches

2. Aggregate Base: 6.0 inches
Payment for replacement AC paving shall be on a lump sum basis.

C. Remnant Paving
Contractor shall remove and replace any remnant pavement section less than 3 ft wide.

All pavement edges shall be cut. When the trench is along the edge of pavement, a minimum of 3’ of pavement shall be removed and replaced per the above criteria.

D. Grinding
Contractor shall grind the existing pavement per City Requirements as applicable prior to overlay with asphalt concrete capping. Contractor shall overlay additional 10 ft. on each side of the disturbed area.

E. Submittals And Approvals
Contractor shall submit all asphalt mix designs directly to the Engineer for review and approval. Mix designs must be approved by the City prior to any asphalt repair.

F. Raising Of Vaults, Manholes And Valve Cans
Contractor shall raise any vault, manhole covers or valve can covers impacted by the pavement repair.

G. Costs
Contractor shall include all costs for this work in the Bid Proposal and no additional compensation will be allowed. All work shall comply with City Encroachment permit as applicable. At the pre-construction meeting, the Contractor shall provide a detailed breakdown (Schedule of Values) of pricing for each individual work item for the pavement repair bid items.

SC-15. PROTECTION OF EXISTING 12-IN FORCE MAIN. The Contractor is hereby notified that the existing in-service 12-in force main is located parallel to the proposed 16- in force main. The Contractor shall take all due precautions and shall protect the existing 12-in force main in place. See SC-16 for additional requirements for locating and potholing. In the event the existing 12-in force main is damaged or compromised in any

Page 818 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
6 way during the execution of this contract, the Contractor shall immediately notify the Engineer and repair any damage. The Contractor shall maintain on the job site repair materials for the 12-in force main, including but not limited to repair clamps and 12-in PVC Pipe.

SC-16. POTHOLING OF EXISTING UTILITIES BY CONTRACTOR.

A. General:

Contractor shall understand that most of the existing underground utilities shown on the drawings are from record and pothole information obtained during the design phase of the project. Refer to Appendix E for information and data relative to these utility potholes previously performed. Every underground utility crossing the proposed pipeline shall be potholed by the Contractor. In addition, the Contractor shall pothole at least 10 locations of the existing parallel 12-in forcemain to confirm its alignment. The Contractor shall prepare a potholing plan to be submitted and approved by the Engineer.

B. Performing Potholes:

The Contractor may perform the necessary utility potholes using his own crew or by using a qualified, experienced underground utility potholing firm. Under either scenario, the data must be accurate as to exact horizontal location; size and type of utility; elevation to top and bottom of utility; pipeline station utility is crossing; etc. Contractor’s proposed potholing procedure and method shall be approved by Engineer prior to Contractor proceeding with the potholing work. The Contractor shall prepare, sign and submit a complete potholing report for review and approval by the Engineer.

It is noted that the proposed potholes are in advance of beginning construction and shall not take the place of Contractor requirement to uncover existing crossing utilities immediately in advance of pipeline excavation; which shall remain the responsibility of the Contractor, and no additional compensation shall be made therefor.

All potholing data shall be added to the as-built drawings.

C. Schedule For Potholing By Contractor:

Contractor shall provide the accurate potholing data and information to the Engineer at least two (2) weeks prior to the pipe installation. Accordingly, the Contractor’s potholing plan shall be submitted within five (5) calendar days following “award of contract” and actual potholing shall be completed within twenty (20) calendar days after approval. The schedule for utility potholing by the Contractor shall be incorporated into the Contractor’s overall construction schedule to be submitted for review and approval.

Changes or delays caused by the Contractor’s failure to properly perform the utility “potholing” either from an accuracy standpoint or a schedule standpoint, shall not be considered as a basis for any extra work compensation or contract time extension.

D. Services And Laterals:

Services and laterals are part of the proposed utilities requiring advance potholing. Where underground main conduits such as water, gas, sewer, telephone, electric power or cable television are shown on the drawings, Contractor shall assume that a lateral for each utility facility extends to every parcel or property, whether or not a service lateral is shown.

In the event that any service lines are shown on the drawings, Contractor shall understand that these services are conceptual as to location and quantity and Contractor shall

Page 819 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
7 coordinate directly with the serving utility for existence/location of service laterals. All costs associated with service connection crossings shall be included in the appropriate bid items of the proposal and no additional compensation will be allowed.

E. Notification For Unknown Utilities:

Upon discovering, in the field, the existence or location of any utility omitted from or shown incorrectly on the drawings, or improperly marked or otherwise indicated, the Contractor shall immediately notify the Engineer, providing full details as to function, depth, location and size.

F. Crossing Of Existing Utilities:

Contractor shall not interrupt or disturb any utility facility without authority from the utility company or order from the City. Where protection is required to ensure integrity of utility facilities located as shown on the Construction Drawings or visible to Contractor.

Contractor shall, unless otherwise provided, furnish and place all necessary protection at no additional cost to the City. The Contractor shall construct the proposed pipelines adjacent to existing utilities. The City has no information about compaction of trench backfill for said utilities. If said trench backfill fails during construction of the proposed pipelines, Contractor shall remove and replace said backfill, compact as specified herein, and remove and replace any asphalt concrete pavement as required, all at no additional cost to the City.

Contractor shall have a sufficient supply of repair or replacement materials on the job site to repair or replace damaged or destroyed facilities resulting from the construction work.

Repairs shall be made with like materials and said repairs shall be approved by the Engineer and owners of damaged utilities prior to backfill. All costs associated with potholing (except as otherwise stipulated herein), protecting in place, relocating, and/or repair of existing utilities shall be included in the bid prices and no additional compensation will be allowed.

G. Payment For Additional Utility Potholing:

Payment for additional potholing as described herein shall be in accordance with the unit price for a utility pothole as designated on the bidding sheet. No payment will be made under this bid item for service lines and laterals.

SC-17. DATA TO BE SUBMITTED BY CONTRACTOR. The Contractor is authorized to arrange, prepare and deliver all required submittals immediately upon receipt of “Notice of Award.” Said delivery shall take place not later than ten (10) calendar days following issuance of the "Notice to Proceed." All required submittals per the Technical Specifications must be reviewed and approved by the Engineer, before any material is purchased and/or before any shop fabrication is started. Submittals shall include but are not limited to the following:

A. Construction schedule, including anticipated shutdowns.

B. PVC Pipe
C Ductile Iron Fittings
D. Valves (mainline, control and appurtenances)
E. Sewage Air valves and enclosures.

F. Asphalt Mixes, Aggregate Base, CDF, Concrete

Page 820 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
8 G. SWPPP for storm water pollution prevention.

H. Traffic Control Plans (if revised)
I. Pressure Testing / Connection / Start-up Plan
J. Potholing Plan and Data
K. 12-in PVC Pipe Repair Materials
L. Bypass Plan for 6-in Beaumont Crossing LS Force Main at 4th Street (see Appendix I for conceptual layout)
M. Other data, information or submittal required per the Special Conditions or Technical Specifications
After receipt of such data, the Engineer will give early approval or correction to expedite the execution of the work under this Contract. The Engineer's approval of the Contractor's submittal data shall not relieve the Contractor from having the entire responsibility for the correctness of details and dimensions. The Contractor shall assume all responsibility and risk for misfits due to errors in the Contractor's submittal data.

SC-18. FITTINGS AND GRADE BREAKS. All minor grade breaks shown on the plans may be accomplished by taking small angular deflections at the field joints and the use of short length pipe segments. Maximum joint deflection shall not exceed 80% of that recommended by the manufacturer. Ductile Iron Fittings shall be used when the deflection angle is more than recommended by the manufacturer.

SC-19. INSPECTOR’S FIELD OFFICE. No Inspector’s Field Office is required for this project. The requirements of GC-29 shall be deleted.

SC-20. PROJECT MEETINGS. The Engineer will schedule monthly progress meetings for the project for the duration of the project. The Contractor’s project manager and project superintendent or qualified representative shall attend all progress meetings. As warranted, a representative from the Contractor’s sub-consultants or suppliers shall attend. The Contractor shall provide a three week look ahead schedule based on the approved and updated master contractor schedule at each progress meeting. The progress meetings will be held at the City Hall offices. At the Engineer’s sole option, the progress meetings may be held at other locations.

From time to time as project conditions warrant, the Engineer may call for additional field meetings. The meetings will be held at the job site. The Contractor’s field superintendent shall attend all field meetings.

All costs associated with all project and field meetings shall be included in the applicable bid item(s) on the Bidding Sheet, and no additional compensation shall be made therefore.

SC-21. RECESSED PLATES. Any steel plates placed on the job within existing pavement shall be recessed and flush with existing pavement.

SC-22. ENCROACHMENT PERMIT. All proposed work is within the City’s existing rights- of-way. The Contractor shall obtain from the City a no-cost encroachment permit for the project. The Contractor shall submit prepare and submit a permit application and all

Page 821 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
9 applicable data to the City prior to construction activities. All costs associated with obtaining and maintaining this permit shall be included in the applicable bid item(s) on the Bidding Sheet, and no additional compensation shall be made therefore.

SC-23. CONTRACTOR RED-LINED DRAWINGS. Per GC51, the Contractor is required to prepare a complete set of record drawings for the project. In the course of the work, the Contractor shall maintain a set of red-lined drawings, documenting all changes to the approved plans, including approved change orders. The Contractor shall show evidence of up-to-date redlined drawings to the inspector prior to approval of any and all progress payments.

SC-24. DEFINITION OF BID ITEMS. The unit prices paid for the items listed in the Contractor’s Proposal as defined herein shall be considered full compensation for furnishing all labor, materials, tools, and equipment, and doing all work involved in furnishing and installing the materials complete and in place, in accordance with the details shown on the Plans, as specified herein, and as directed by the Engineer.

All incidental work which is neither shown on the Plans nor otherwise specified, and which is necessary to complete the improvements as shown on the Plans and as specified in the Contract Documents (defined in the Contract/Agreement), shall be furnished and installed as though such work were shown on the Plans or specified in the Contract Documents, and no additional compensation shall be allowed therefore.

All Conditions of the Contract apply to work of this Section.

Scope of Work:

The scope of work includes, but is not limited to, each bid item listed in the Contractor’s Proposal and as described in the these specifications.

This work includes furnishing labor, materials, tools, equipment, transportation, and services required for complete and satisfactory construction of Beaumont Mesa Lift Station Force Main Project, in accordance with the Plans and these Specifications prepared by the City of Beaumont Engineering Division.

All Bid Items shall be in accordance with the latest edition of the Standard Specifications for Public Works Construction (2018 edition), County of Riverside Standards and Specifications and Eastern Municipal Water District Standards and Specifications, and the Technical Specifications herein.

Other Reference Standards:

1. California Vehicle Code

2. Work Area Traffic Control Handbook (WATCH)

3. California Manual of Uniform Traffic Control Devices (CA-MUTCD) (latest edition)

Page 822 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
10 4. County of Riverside Standards and Specifications (Ordinance 461) (latest edition available at: https://rctlma.org/trans/Land-Development/Road- Standards)

5. Eastern Municipal Water District Standards for force mains (latest edition available at: https://www.emwd.org/

All work within the project areas shall follow the pipeline plans prepared for this project, and were applicable, approved Standard Plans and the Standard Plan for Public Works Construction, Standard Specifications for Public Works Construction and County of Riverside Standards and Specifications (Ordinance 461) as identified herein.

The City of Beaumont refers to Eastern Municipal Water District (EMWD) standards for the many of the materials associated with this force main project. The specific EMWD standards used are listed as follows:

Section 02768 Furnish and Install PVC Force Main
Section 15064 Plastic (PVC) Pressure Water Pipe & Fittings (used for force main) Section 15089 Nuts and Bolts
Section 15105 Plug Valves
Section 15188 Air Release Valves for Sewage Service
Section 15340 Manholes and Fittings

These standards are provided in Appendix F.

SC-25. NOTIFICATION OF RESIDENTS AND BUSINESSES. The Contractor shall provide notice of the work, in person and with printed notification (in English and Spanish language), at least ten (10) working days prior to commencing construction activities, to all agencies, firms, institutions, postal service, residents, stores, utilities and waste disposal service providers fronting or affected by the work. Additional printed notification (in English and Spanish language) shall be given not less than forty-eight (48) hours prior to performing any work which will restrict property access, partially close the street, or which will restrict or disallow street parking. No full street closures will be allowed.

The printed notices shall contain a general description of the work to be done and the date that the work is to be done. The notices shall also include a statement that parking will be restricted as called for on the "NO PARKING" signs to be posted along the street.

All public notices must be reviewed and approved by the Resident Engineer prior to its distribution.

The Contractor shall also post printed "NO PARKING-TOW AWAY" signs at one- hundred-foot (100') maximum spacing along each side of the affected street for forty-eight (48) hours prior to the commencement of the street repair work. The Contractor shall

Page 823 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
11 document the day, date and time the "NO PARKING" signs were posted. Posting of signs on trees and utility poles will not be allowed.

The signs shall contain the day, date, hours and vehicle code section reference that parking will be prohibited on that particular street, CVC 22651L and CVC 22654D. Signs that prohibit or restrict parking shall be removed immediately upon completion of work in the restricted or prohibited area.

The printed notices and the "NO PARKING" signs shall be furnished by the Contractor.

SC-26. SOUND REQUIREMENTS. Sound control shall conform to General Conditions Article 25 and the provisions in Section 3-12.3, "Noise Control," of the Standard Specifications for Public Works Construction and these Technical Provisions.

The noise level from the Contractor's operations, between the hours of 9:00 p.m. and 6:00 a.m., shall not exceed 86 dBA at a distance of 50 feet. This requirement shall not relieve the Contractor from responsibility for complying with local ordinances regulating noise level.

The noise level requirement shall apply to the equipment on the job or related to the job, including but not limited to trucks, transit mixers or transient equipment that may or may not be owned by the Contractor. The use of loud sound signals shall be avoided in favor of light warnings except those required by safety laws for the protection of personnel.

SC-27. MOBILIZATION, DEMOBILIZATION AND INSURANCE. This bid item shall conform to General Conditions, Article 45, and the following:

Mobilization shall consist of preparatory work and operations, including, but not limited to those necessary for the movement of personnel, equipment, supplies and incidentals to the project site and for all other work and operations which must be performed or costs incurred prior to beginning work on the various contract items on the project site. This item also includes obtaining all business licenses and permits, as required for the entire project, from all related agencies, including, but not limited to utility companies, private and public agencies and the City; and complying with the requirements specified in those licenses and permits; coordination, and incidentals necessary to perform all related items of work.

De-mobilization shall consist of the completion of all final construction and administrative work required to secure the project for termination and acceptance by the Engineer, including, but not limited to the following:

1. Satisfactory completion of force main, associated appurtenances and street pavement repairs;

2. Removal of all temporary facilities, construction office, temporary utilities, temporary BMPs, plant, equipment, surplus material, construction debris and

Page 824 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
12 similar from project limits and adjacent property, as required and as directed by the Engineer;

3. Restoration of all temporary roads and haul routes and construction storage and office areas, etc. to original or better condition;

4. Completion of record of drawings (as-built), to the satisfaction of the Engineer;

5. Submission of final certified payroll documents to the Engineer;

6. Completion of the requirements of permits issued by other agencies;

7. Satisfactory completion of all other contractually and legally required construction and administrative items of work.

Insurance shall include all insurance and bonding required by these specifications.

SC-28. MOBILIZATION, DEMOBILIZATION AND INSURANCE. Construction Survey will be provided by the City. See Special Conditions for additional details.

Monument Preservation by the contractor includes qualified personnel, equipment, and supplies required for, but not limited to tie out of all monuments, replacement of disturbed monuments, and additional items included in the contract documents.

For any monumentation impacted by this project outside of the bid alignment and nominal construction impact area, the contractor will be responsible to provide pre and post- construction corner records for the City to file with Riverside County.

SC-29. GUARANTEE. In addition to guarantees required elsewhere, the contractor shall and hereby does guarantee all Work for a period of one (1) year after the date of acceptance of the Work by the City and shall repair and replace any and all such Work, together with any other work which may be displaced in so doing that may prove defective in workmanship and/or materials within the one (1) year period from the date of acceptance, without expense whatsoever to the City, ordinary wear and tear and usual abuse or neglect excepted. In the event of failure to comply with the above mentioned conditions within five (5) days after being notified in writing, the City is hereby authorized to proceed to have the defects repaired and made good at the expense of the Contractor, who shall pay the cost and charges therefore immediately upon demand.

SC-30. TRAFFIC STRIPING AND PAVEMENT MARKINGS. All traffic stripes and markings, both replaced in-kind or as shown on plan, shall be thermoplastic. Application of thermoplastic traffic stripes (lane lines, centerlines) and thermoplastic pavement markings (word and symbol markings, limit lines, crosswalk, etc.) shall conform to the provisions in Section 84, "Pavement Markings," of the 2018 Caltrans Standard Specifications and these Technical Provisions.

The Contractor shall layout and “cat-track” the alignment of the proposed striping at 15- foot intervals and “spot” the proposed pavement markings as called for on the Plans.

Striping shall vary no more than 2 inches in 50 feet from the specified alignment. The Engineer may waive minor variations.

Page 825 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
13 The Contractor shall not proceed with applying any thermoplastic pavement striping and markings until the Engineer has checked and approved the cat-tracking and spotting, and has authorized the Contractor to proceed.

All traffic striping shall be performed with a road liner type striping machine. Where the configuration or location of a traffic stripe is such that the use of a road liner type striping machine is unsuitable, thermoplastic may be applied by other methods and equipment approved by the Engineer. The Engineer shall determine if the road liner type striping machine is unsuitable for a particular use.

Except as otherwise noted on the Plans or as directed by the Engineer, all angle points, as shown on the Striping Plans shall be painted as a smooth, tangent curve with a radius and length as approved in the field.

Temporary tape or reflective markers utilized for the purposes of interim delineation for centerline, lane lines, and crosswalk lines shall be placed to the side of the final striping pattern in such a way so that it will not interfere with the first coat of paint. All temporary tape and reflective markers applied for the purpose of interim delineation shall be removed by the Contractor at no additional cost to the City upon completion of the first coat of striping and prior to the final striping.

Newly applied or existing striping or markings which are damaged as a result of the construction, including wheel markings by public traffic and the construction equipment, shall be replaced in kind, and any associated removals shall be performed as outlined in these Technical Provisions at the sole expense of the Contractor and no separate compensation will be allowed therefore.

Existing traffic striping and pavement markings that do not conform to the approved Plans shall be removed by wet sandblasting. Other methods may be requested by the Contractor, but shall be submitted in writing to the Engineer for approval. Blackout of existing traffic striping or pavement markings, which do not conform to the approved Plan, shall not be allowed.

SC-31. TRAFFIC CONTROL. Traffic controls, including but not limited to, vehicular and pedestrian traffic controls, maintenance of vehicular and pedestrian access through work areas, detours, and lane closures shall be in accordance with these Technical Provisions; Traffic Control Plans; California MUTCD, Part 6, Temporary Traffic Control, Caltrans adopted 2014; the current "Work Area Traffic Control Handbook" (WATCH); Subsection 7-1, Section 12 “Temporary Traffic Control” and Section 81 “Miscellaneous Traffic Control Devices” of the current Caltrans Standard Specifications, including all its subsequent amendments. Traffic signs shall also conform to Section 56 “Overhead Sign Structures, Standards, and Poles” of the Caltrans Standard Specifications, where applicable.

Temporary pavement marking and striping shall also conform to Section 84 “Markings” of the Caltrans Standard Specifications, where applicable.

Page 826 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
14 Nothing in the Technical Provisions shall be construed as relieving the Contractor from its responsibility to provide for the safety and convenience of traffic and the public during construction.

The Temporary Traffic Control (TTC) Plans shall be prepared by the Contractor and shall be approved by the City Engineer prior to work. The TTC plans will include the appropriate number of stages to safely implement the project The Contractor shall provide safe and continuous passage for pedestrian and vehicular traffic at all times.

The TTC Plans shall be signed and stamped by a California Registered Traffic or Civil Engineer and submitted to the City for approval.

In the event of conflict, the order of precedence shall be as follows:

1. Technical Provisions

2. Traffic Control Plans

3. California Manual on Uniform Traffic Control Devices, Part 6, Temporary Traffic Control, Caltrans adopted 2014.

4. Work Area Traffic Control Handbook. (WATCH)

5. Caltrans Standard Specifications

6. Standard Specifications for Public Works Construction

Traffic Control shall be in accordance with the following Special Provisions:

1. All streets shall remain open to through traffic at all times, no street closures are anticipated. A minimum of one through lane of traffic is required. If not possible, the Contractor shall include flagging operations as needed. The Contractor shall make provisions to allow local traffic access to all properties along the alignment.

The Contractor shall provide a smooth travel way and either a flagger and/or signing to direct traffic.

2. The Contractor shall be responsible for the preparation of Traffic Control Plans as necessary for the work. The Traffic Control Plans shall be signed and stamped by a California Registered Traffic Engineer and transmitted to the City for approval no later than fourteen (14) calendar days prior to the scheduled commencement of work. Comments and corrections shall be returned to the Contractor within five (5) working days. The Traffic Control Plans shall conform to the requirements listed in these Technical Provisions; California MUTCD Part 6, Temporary Traffic Control; the Work Area Traffic Control Handbook; the Standard Specifications; and the Caltrans Standard Specifications.

Page 827 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
15 3. All traffic controls and safety devices, equipment and materials, including but not limited to cones, channelizers, delineators, flashing warning lights, barricades, high level warning devices (telescoping flag trees), flags, signs, markers, portable barriers, temporary railing (Type-K), temporary fencing, temporary crash cushion, flashing arrow signs, changeable message sign, markings, and flagging equipment shall be provided and maintained in “like new” condition.

4. The Contractor shall furnish and properly install, construct, erect, use and continuously inspect and maintain, twenty-four (24) hours per day, seven (7) days per week, which includes holidays, all said devices, equipment and materials and all temporary and permanent pedestrian and driving surfaces as necessary to provide for the safety and convenience of, and to properly warn, guide, control, regulate, channelize and protect the vehicular traffic, pedestrian traffic, project workers, and the public throughout the entire limits of the work activity and beyond said limits as necessary to include areas affecting or affected by the work, from the date of Notice to Proceed to the completion and acceptance of the work.

5. All barricades shall be equipped with flashing warning lights, and all traffic cones shall be no less than 711mm (28“) in height, except that shorter cones, 305 mm (12“) minimum height, may be permitted during striping maintenance operations where the only function of the cone is to protect the wet paint from the traffic.

6. Reflectorized (both sides) temporary self-adhesive markers, 100mm (4in) wide, shall be applied to unstriped pavement surface before opening the travel way to public traffic. Reflectorized temporary yellow markers shall be used for to delineate the centerline to separate opposing traffic. Reflectorized temporary white markers shall be used to delineate lanes of travel and placed in 600mm (24in) intervals transverse to the road to delineate stop bars and limit lines.

7. The reflectorized temporary markers shall be removed the same day the first coat of striping has been placed on the pavement. The removal of the markers shall be done such a way that the pavement is not damaged.

8. Except as otherwise approved by the Engineer, two-way vehicular traffic shall be maintained at all times within two (2) 11’ wide lanes. Other streets of lesser widths may be reduced to one (1) 12’ wide lane with work activity being limited to one side at a time, and the one-way vehicular traffic being maintained at all times by properly trained and experienced flaggers. All lane closures shall have flashing arrow signs to provide additional, high level, advanced warning.

14. No reduction of the traveled way width shall be permitted on any City street before 7:00 a.m. or after 5:00 p.m., on weekends or City recognized holidays, or when active work is not being done, unless otherwise approved by the Engineer.

Page 828 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
16 15. Properly trained and experienced flaggers shall be provided to direct traffic when said traffic is to be interrupted, when two-way traffic is to be reduced to one-way traffic, and at other such times as is necessary to safely pass traffic through or around the work area and when so directed by the Engineer.

16. Vehicular access to occupied residential property may be restricted on weekdays, other than holidays, between the hours of 8:30 a.m. and 3:30 p.m. while essential work activity is taking place only upon approval by the Engineer and providing the Contractor gives the property owner or resident at least forty- eight (48) hour advance written and oral notice.

17. Convenient and safe pedestrian access to occupied residential and business property shall be maintained at all times. Access to mailboxes shall be maintained at all times such that the postal delivery service is not interrupted.

Trash pick-up services shall not be interrupted. Access to vacant and unused property may be restricted when approved by the Engineer. Both vehicular and pedestrian access shall be maintained at all times to all other property except as otherwise specifically authorized in writing by the Engineer.

18. Vehicular access to business driveways shall be maintained at all times during construction.

19. Traffic control and safety devices and equipment being used that becomes damaged, destroyed, faded, graffitied, encrusted, soiled, misplaced, worn out, inoperative, lost, or stolen shall be promptly repaired, refurbished, or replaced.

Traffic control and safety devices and equipment being used, that are displaced or not in an upright position from any cause, shall be promptly returned or restored to their proper position.

20. An unobstructed view of all signs and warning devices including, but not limited to, stop signs, stop ahead signs, street name signs, and other regulatory, warning and construction signs, markers, and warning devices shall be maintained at all times. All speed limit signs shall be black on white with signs at either end of the project notifying the motoring public that fines are doubled in construction zones.

No trucks or other equipment or materials shall be stopped, parked, or otherwise placed so as to obscure said signs, markers and devices from the view of the vehicular and pedestrian traffic to which it applies.

21. When entering or leaving roadways carrying public traffic, the Contractor’s equipment, whether empty or loaded, shall yield to said public traffic at all times, except where the traffic is being controlled by police officers, fire officers, properly trained and experienced flaggers, or at traffic signalized intersections.

22. Stockpiling or storage of materials on any public right-of-way or parking area will not be allowed without the specific written permission of the Engineer. Materials

Page 829 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
17 spilled along or on said right-of-way or parking area shall be removed completely and promptly. All stockpile and storage areas shall be maintained in a safe, neat, clean, and orderly condition, and shall be restored to equal or better than original condition upon completion of the work.

23. On projects involving work on, closure of, or partial closure of existing streets, and where vehicular access to the abutting property must be restricted, the work shall be so selected, arranged and scheduled that the person(s) requiring access to said abutting property and residents along said streets affected will be able to park within a reasonable distance of not more than 500’ from their homes or destination. In addition, no two adjoining streets shall be closed at the same time, except as otherwise approved by the Engineer. Residents must be given written notice of such restrictions a minimum of 48 hours in advance.

24. When work has been completed on a particular street or has been suspended or rescheduled, and said street is to be opened to vehicular traffic, all equipment, “NO PARKING” signs, other obstructions, and unnecessary traffic control devices and equipment shall be promptly removed from that street, except as otherwise approved by the Engineer.

25. Should the Contractor be neglectful, negligent, or refuse, fail, or otherwise be unavailable to promptly, satisfactorily, and fully comply with the provisions specified and referred to herein above, the City reserves the right to correct or mitigate any situation, that in the sole opinion of the Engineer, constitutes a serious deficiency or serious case of noncompliance, by any means at its disposal at the Contractor’s or permittee’s expense, and shall deduct the cost therefore from the Contractor’s progress or final payments. Such corrective action taken by the City shall not reduce or abrogate the Contractor’s legal obligations and liability for proper traffic control and safety measures and shall not serve to transfer said obligations and liabilities from the Contractor to the City or the City’s agents.

26. Violations of any of the above Provisions or provisions of the referenced publications, unless promptly and completely corrected to the satisfaction of the Engineer, shall, at the sole discretion of the City, be grounds for termination of the Contract, or shut down or partial shutdown of the work, without compensation to the Contractor or permittee, or liability to the City, all as prescribed by contractual obligation or State law, whichever is applicable.

27. Contractor shall be responsible for the furnishing, installation, monitoring, operation, and maintenance of temporary off-site traffic and street improvements, at intersections along alternate routes during construction, as shown on the plans or modify the temporary offsite improvements at the direction of the Traffic Engineer.

Page 830 of 1492 ends

City of Beaumont
Special Conditions Mesa Lift Station Force Main
CIP WW-09

SPECIAL CONDITIONS
18 [Page Left Intentionally Blank.]

Page 831 of 1492 ends

City of Beaumont
Request for bid Mesa Lift Station Force Main
CIP WW-09

40 04 TECHNICAL SPECIFICATIONS
CIP WW-09 BEAUMONT MESA LIFT STATION FORCE MAIN

Page 832 of 1492 ends

City of Beaumont
Technical Specifications Mesa Lift Station Force Main
CIP WW-09

TECHNICAL SPECIFICATIONS
1 TECHNICAL SPECIFICATIONS

Page 833 of 1492 ends

Section 4 # of Pages
Technical Specifications Table of Contents

TECHNICAL SPECIFICATIONS
011000 Summary of work ………………………………………………………………………………… 7 013100 Project Management and Coordination …………………………………………………….…… 12 013130 Safety ………………………………………………………………………………………..….… 4
013200 Construction Progress Documentation ………………………………………………...………….. 8 013300 Contractor Submittals …………………………………………………………………………… 10 014000 Quality Requirements ……………………………………………………………...………………8 014200 Abbreviations and Reference Standards …………………………………………………………. 6 015000 Temporary Facilities and Controls …………………………………………………………..….. 10 015300 Protection of Existing Facilities ………………………………………………………………….. 2 015600 Project Environmental Controls ………………………………………………………………….. 6 016100 Product Requirements …………………………………………………………………………….. 4 017700 Closeout Procedures ………………………………………………………………………………. 5 017823 Operation and Maintenance Data ………………………………………………………………… 6 017839 Project Record Documents ……………………………………………………………………….. 4 099723 Epoxy Coating for Wastewater Structures ……………………………………………………….16 315000 Excavation Support and Protection ……………………………………………………………….. 2 319000 Geotechnical Report ……………………………………………………………………………... 64 02768 Furnish and Install PVC Force Main ……………………………………………...........………….10 15064 Plastic (PVC) Pressure Water Pipe & Fittings ………………………………………………………3 15089 Nuts and Bolts ……………………………………………………………………………………….1 15105 Plug Valves ………………………………………………………………………………………….2
15108 Air Release Valves for Sewage Service ……………………………………………………………..3 15340 Manholes and Fittings ………………………………………………………………………………2

Page 834 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-1

SECTION 011000 – SUMMARY OF WORK
PART 1 - GENERAL

1.1 SUMMARY
A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Construction Documents

4. Phased construction

5. Lift station operation during construction

6. Construction and schedule constraints

7. Sequence of construction

8. Access to site.

9. Coordination with occupants.

10. Specification and drawing conventions.

B. Related Requirements:

1. Section 015000 "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1.2 PROJECT INFORMATION
A. Project Identification: City of Beaumont, Beaumont Mesa Lift Station Force Main Project

1. Project Location: Potrero Blvd, Western Knolls Avenue, Nicholas Road and 4th Street; City of Beaumont, California
B. Owner: City of Beaumont
C. Engineers: Force Main - Albert A. Webb Associates, Brad Sackett (951) 686-1070 Lift Station - Aqua Engineering, Justin Logan (801) 299-1327

1. Engineers have been engaged for this Project to provide engineering services.

1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. The following list has been furnished for the convenience of the Contractor and shall not be considered as representing all Work required in the Contract Documents. Contractor shall not take advantage of any errors or omissions in this listing and shall report any discrepancies or

Page 835 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-2

questionable items to the Engineer for clarification. The Work of Project is defined by the Contract Documents and consists of the following:

1. The Mobilization of all equipment, labor, tools, and materials to and from the project site.

2. Pressure Testing of a section of existing 16-in diameter force main

3. Construction of a new 16-in diameter force main and appurtenances.

4. Construction of a new air valve facility near the north end of Nicholas Road

5. Construction of new manholes at the intersection of Nicholas Road and 4th Street

6. Pavement Repair on Western Knolls Avenue and 4th Street.

7. Testing and Startup and Commissioning as described in Section 017500 – Commissioning.

List above is intended to provide an overview of the major project components and does not include all work described in Contract Documents.

B. Type of Contract.

1. Project will be constructed under a single prime contract.

1.4 CONSTRUCTION DOCUMENTS
A. The Contractor may obtain copies of the construction documents as directed in the Instruction to Bidders in Volume 1, “Notice and Invitation to Bidders.” Electronic copies of the existing force drawings are available in the appendices. Note that only limited “record drawings” or “as- constructed drawings” for previous construction projects are available and may not accurately reflect the as-constructed condition.

1.5 PHASED CONSTRUCTION
A. The Work shall be conducted in accordance with an approved Contractor’s Schedule.

1. It is expected that the project will consist of a single phase(s). Work on the project initial phase shall commence simultaneously with the Notice to Proceed and be substantially complete and ready for full use Two Hundred and Ten (210) calendar days after the issue of Notice to Proceed.

B. Phases:

1. The project consists of a single phase of work, however, the single phase must be sequenced to maintain the existing parallel 12-in diameter force main continuously. All work is to be completed in 210 calendar days from the issue of Notice to Proceed.

Page 836 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-3

C. The Contractor’s Schedule shall include completion dates. It shall also be coordinated with the sequencing plan. It is anticipated and expected that work will begin with the issue of the Notice to Proceed.

1.6 LIFT STATION OPERATION DURING CONSTRUCTION:

A. Continuous operation of the Owner's existing facilities is of critical importance. The purpose of the following is to provide a general overview of the operations and critical facilities that must remain in operation during the construction:

1. Existing Facility Description: The existing facilities consist of a parallel 12-in diameter force main and appurtenances and the discharge or an existing 6-in diameter force main at Nicholas Road and 4th Street.

2. During construction, the existing facilities must remain in operation. Therefore, the Contractor must protect the existing force main in place and follow a sequential removal and construction approach for the facilities at the intersection of Nicholas Road and 4th Street.

1.7 CONSTRUCTION AND SCHEDULE CONSTRAINTS

1. Construction of the Work may require short disruptions of the facilities to make critical connections or replace infrastructure. Contractor shall schedule and conduct activities to enable existing facilities to operate continuously, unless otherwise specified. Contractor shall provide temporary facilities, bypass systems, or other approved means to ensure continuous operation of facilities to meet system operational and emergency demands.

2. Contractor shall notify Engineer and Owner in writing at least 14 working days in advance of any operation that will disrupt Owner's facilities or operations or any required shutdown. Prior to removing any portion of the existing facilities, submit and obtain Engineer and Owner approval for all submittals required to construct the proposed improvements.

3. Clearly demonstrate in the CPM Schedule and other submittals, to the satisfaction of the Owner and the Engineer, the Contractor's ability to complete the Work requiring an interruption of service (shutdown work) within the allowable duration. The Contractor is responsible for any required dewatering and including this effort in the shutdown schedules.

4. If the Contractor does not clearly demonstrate the ability to complete the shutdown work in the CPM Schedule proposed during a shutdown period, the Owner reserves the right to limit the scope of the shutdown work which the Contractor may undertake.

5. Opportunities for shutdown of existing force main operation will be limited to periods of low flows and of very limited duration. The periods of daily low flows are typical associated with hours between 10:00 PM and 6:00 AM.

1.8 SEQUENCE OF CONSTRUCTION
A. The following paragraphs are provided as guidance to the Contractor with the intent of providing general information regarding the required sequencing of construction of individual processes and infrastructure. It is not the intent of the following paragraphs to identify all the work required to be in place for any given connection.

Page 837 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-4

B. The listing of items below also does not indicate or imply that all constraints or special conditions have been identified. The list is not a substitute for the duty of the Contractor to coordinate and plan for completion, all Work by the Substantial/Contract Completion Dates specified in the Contract Documents. The Contractor is responsible for all coordination and scheduling with the City staff and personnel. The Contractor shall verify that all facilities are available before the start-up of the system. Also, some of the facilities may be constructed (but not Substantially Complete) simultaneously, or ahead of the identified process predecessors. It is noted that the guidelines may change upon a more detailed review of the scheduling. The Engineer is not responsible for scheduling the Contractor’s work.

1. Task 1 – Testing of the Existing 16-in Dia. Force Main

Construction Predecessor: Mobilization

For this task to be completed, the following activities must be completed:
a. Pressure Testing of a section the existing 16-in dia. force main b. Video Inspection of a section of the existing 16-in dia. force main c. Repair of ex. 16-in dia force main at testing point on Western Knolls Avenue

Construction Notes and Work Constraints: Coordinate all work with City’s staff.

2. Task 2 – Construction of the Proposed 16-in Dia. Force Main and Appurtenances

Construction Predecessor:
a. Delivery of 16-in PVC Pipe.
b. Video Inspection of a section of existing 16-in dia. force main

For this task to be completed, the following activities must be completed:
a. Installation and testing of proposed 16-in dia. force main along Potrero Blvd and Western Knolls Parkway.
b. Proposed Connection at Lift Station and along Western Knolls Avenue c. Construction of the proposed air valve facility near the north end of Nicholas Road

Construction Notes and Work Constraints: Existing 12-in dia force main to remain operational throughout this work. It is anticipated that the first portion of the pipeline to be constructed is near the existing lift station to minimize any conflicts with the separate work on the lift station.

3. Task 3 – Connection to ex. 12-in dia. force main at STA 59+30 +/-

Construction Predecessor:
a. Delivery of new valve.
b. Task 2 Substantial Completion

For this task to be completed, the following activities must be completed:
a. Shutdown approval and scheduling.
b. Partial Dewatering of existing 12-in dia. force main.

Construction Notes and Work Constraints: Task 2 must be completed and ready to be operational.

Page 838 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-5

4. Task 4 – Manhole installations at Nicolas Road and 4th Street:

Construction Predecessor:
a. Delivery of new polymer concrete manholes

For this task to be completed, the following activities must be completed:
a. Existing 12-in and 6-in force mains need to be re-routed around construction footprint.
b. Potholing of existing facilities within construction footprint.

Construction Notes and Work Constraints: Existing force mains shall remain operational at all times except for short shutdowns to make final connections. In general, this task may be completed in parallel with any of tasks listed above. The Contractor shall propose a sequence of construction. This sequence must be submitted to the Owner for approval, along with all details necessary for complete implementation.

C. The Contractor shall prepare and submit a phasing/sequencing plan. The contractor may use the individual sequencing listed above to propose construction phasing. The proposed phasing plan will be evaluated by the Engineer and the Owner prior to approval. When developing the phasing plan, the contractor shall evaluate other construction factors such as the requirement to keep the lift station operational at all times, material lead times, and provide adequate access for City’s operations and maintenance.

D. The contractor shall coordinate ahead of time connections and potential operational interruptions with the City staff and will be responsible for planning and coordinating all aspects of the work. The Contractor is required to submit a detailed work plan for each shutdown, connection or tie-in event.

E. It shall be the responsibility of the Contractor to ensure that the existing facilities maintain operability throughout the construction. The Contractor shall be held liable for damages resulting from sewage spills caused by improperly performed shutdowns and bypasses.

F. If a proposed bypass operation is needed, the Contractor shall submit a bypass plan in accordance with Section 020960 of the Specifications. Prior to any bypassing, the plan must be approved by the Owner and Engineer. The Contractor shall be responsible for clean -up and repair of any damage caused during bypassing.

1.9 ACCESS TO SITE
A. General: Contractor shall have full access to the public rights-of-way based on the plans and conditions of the encroachment permits, defined as the limits of construction, for construction operations during construction period. Contractor's use of public right-of-way is limited to perform the proposed work or to retain other contractors for work on proposed facilities. The Contractor is notified that another contractor will be working at the Beaumont Mesa Lift Station at the same time as separate work. The Contractor shall cooperate in scheduling any of his proposed work in front of the existing lift station with the contractor for the lift station work.

B. Use of Site: Limit use of Project site to work in areas indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

Page 839 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-6

1. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

2. Contractor shall coordinate with the City and provide access during construction to the lift station and all appurtenances along the existing force main for operating, cleaning, and maintenance of all facilities.

1.10 COORDINATION WITH OCCUPANTS
A. Full Owner Occupancy: The City will be operating the Beaumont Mesa Lift Station throughout this contract.

1. Maintain access to the lift station site at all times. Do block access, even for short periods, without written permission from the City.

2. Notify the City not less than 72 hours in advance of activities that will affect City's operations and access to the lift station site..

B. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

C. Work Hours: Limit work to normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, except City Recognized Holidays, unless otherwise indicated and/or agreed with the Owner all in accordance with General Conditions, except for specifically scheduled night work.

D. Smoking requirements are to comply with California State law.

1.11 SPECIFICATION AND DRAWING CONVENTIONS
A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. General and Special Conditions: Requirements of General and Special conditions provided in Volume I of Contract Documents apply to the Work of all Sections in the Specifications.

Page 840 of 1492 ends

CITY OF BEAUMONT SUMMARY OF WORK
BEAUMONT MESA L-S FORCE MAIN 011000-7

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations and scheduled on Drawings.

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

END OF SECTION 011000

Page 841 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination drawings.

2. Requests for Information (RFIs).

3. Requests for Change (RFCs)

4. Project Web site.

5. Project meetings.

1.2 DEFINITIONS
A. RFI: Request from Owner, Engineer, or Contractor seeking information required by or clarifications of the Contract Documents.

B. RFC: Request from Contractor proposing a change to the contract requirements.

1.3 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, and telephone number of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

1.4 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

Page 842 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-2
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the schedule of values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Preinstallation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.5 COORDINATION DRAWINGS
A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:
a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
b. Indicate dimensions shown on the Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Engineer indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to acoustical ceiling grid.

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment.

Page 843 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-3

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

6. Review: Engineer will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility.

1.6 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified. A sample RFI form is included at the end of this Specification.

1. Engineer will return RFIs submitted to Engineer by other entities controlled by Contractor with no response.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

3. Owner or Engineer will not review the Contractor’s RFIs that are in fact Requests for Changes (RFCs), as determined by the Owner. In such cases, Contractor will be required to resubmit on the appropriate RFC form.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Project number.

3. Date.

4. Name of Contractor.

5. Name of Engineer.

6. RFI number, numbered sequentially.

7. RFI subject.

8. Specification Section number and title and related paragraphs, as appropriate.

9. Drawing number and detail references, as appropriate.

10. Field dimensions and conditions, as appropriate.

11. Contractor's suggested resolution. If Contractor's solution(s) impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

12. Contractor's signature.

13. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Engineer.

D. Engineer's Action: Engineer will review each RFI, determine action required, and respond.

Allow seven (7) working days for Engineer's response for each RFI. RFIs received by Engineer after 1:00 p.m. PST will be considered as received the following working day.

Page 844 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-4

1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for coordination information already indicated in the Contract Documents.
d. Requests for adjustments in the Contract Time or the Contract Sum. e. Requests for interpretation of Engineer's actions on submittals. f. Incomplete RFIs or inaccurately prepared RFIs.

2. Engineer's action may include a request for additional information, in which case Engineer's time for response will date from time of receipt of additional information.

3. Engineer's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit a Change Proposal. a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Engineer and Construction Manager in writing within 10 (10) days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log weekly. Software log with not less than the following:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Engineer.

4. RFI number including RFIs that were dropped and not submitted.

5. RFI description.

6. Date the RFI was submitted.

7. Date Engineer's response was received.

F. On receipt of Engineer's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Engineer within seven (7) days if Contractor disagrees with response.

1. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate.

2. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.

1.7 REQUEST FOR CHANGE (RFCs)
A. Contractor shall submit a Request for Change when Contractor proposes a change in the Contract requirements. All change requests shall be submitted on the RFC form atta ched to this Specification. As shown therein, Contractor is required to fully describe the benefit(s) to the Owner, benefit(s) to the Contractor, the cost and/or schedule impact(s) associated with the requested change, along with whether or not Contractor proposes or requires a Contract Change Order for implementing the change. Except for as described in Section 1.6 herein, any Contractor RFC that is submitted on the RFI form will be returned without review.

Page 845 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-5
B. As noted on the RFC form, it is understood that certain RFCs can be responded to promptly, with minimal expenditures required by Owner. It is also understood that other RFCs require significant expenditures by Owner in order to properly evaluate and respond to Contractor’s RFC. For those RFCs that fall in the latter category, Owner will provide an estimate (time and money) to Contractor as an initial response to RFC. Contractor may then elect to have Owner proceed with evaluating Contractor’s RFC (with estimated value deducted from Contractor’s Contract with the Owner), or elect to withdraw Contractor’s RFC.

1.8 PROJECT MEETINGS
A. General: Construction Manager will schedule and conduct meetings and conferences at Project site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Engineer of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Entity responsible for conducting meeting will record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner, Construction Manager, and Engineer, within three (3) days of the meeting.

B. Preconstruction Conference: Engineer will schedule and conduct a preconstruction conference before starting construction, at a time convenient to Owner and Engineer, but no later than fifteen (15) days after execution of the Agreement.

1. Attendees: Authorized representatives of Owner, Construction Manager, Engineer, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing and long-lead items.
d. Designation of key personnel and their duties.
e. Procedures for processing field decisions and Change Orders. f. Procedures for RFIs.
g. Procedures for testing and inspecting.
h. Procedures for processing Applications for Payment.
i. Distribution of the Contract Documents.
j. Submittal procedures.
k. Preparation of record documents.
l. Use of the premises.
m. Work restrictions.
n. Working hours.
o. Owner's occupancy requirements.
p. Responsibility for temporary facilities and controls. q. Procedures for disruptions and shutdowns.

Page 846 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-6
r. Construction waste management and recycling.
s. Parking availability.
t. Office, work, and storage areas.
u. Equipment deliveries and priorities.
v. First aid.
w. Security.
x. Progress cleaning.

3. Minutes: Entity responsible for conducting meeting will record and distribute meeting minutes.

C. Progress Meetings: Construction Manager will conduct progress meetings at weekly intervals.

1. Attendees: In addition to representatives of Owner, Construction Manager, and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. 1) Review schedule for next period.
b. Contractor shall prepare three-week look ahead schedules for review at each progress meeting. The three-week look ahead schedules are not an acceptable substitute for CPM schedule updates that must be submitted with Contractor’s monthly partial payment requests.
c. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Status of documentation.
5) Deliveries.
6) Off-site fabrication.
7) Access.
8) Site utilization.
9) Temporary facilities and controls.
10) Progress cleaning.
11) Quality and work standards.
12) Status of correction of deficient items.
13) Field observations.

Page 847 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-7
14) Status of RFIs.
15) Status of proposal requests.
16) Pending changes.
17) Status of Change Orders.
18) Pending claims and disputes.
19) Documentation of information for payment requests.

3. Minutes: Entity responsible for conducting the meeting will electronically record, transpose and distribute the meeting minutes to each party present and to parties requiring information.
a. Schedule Updating: Revise Contractor's construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

4. It is noted that inspection will not be provided during scheduled progress meetings.

Contractor is not permitted to perform work that requires inspection (as determined by Owner) during the progress meetings. Contractor shall adjust his schedule to accommodate said weekly progress meetings and no additional compensation will be provided for same. Contractor’s bid shall consider Owner’s requirements for weekly progress meetings. Owner, at its sole discretion, may decrease the frequency of progress meetings if deemed appropriate.

PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)

Page 848 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-8
SAMPLE
CONTRACTOR'S REQUEST FOR INFORMATION (RFI) #__________

To (Engineer):

From (Contractor):

Subject:

Reference: Construction Drawing: Specification (Section and Page):

REQUEST
Information is requested as follows:

Information Requested By (Name): Date:

Response Requested By (Date):

Received by CM (Date):

RESPONSE
Response to Information Request:

Response By (Name): Date:

Final Distribution:

Page ___ of ___

Page 849 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-9
SAMPLE
CONTRACTOR'S REQUEST FOR CHANGE (RFC) #__________

To (Engineer):

From (Contractor):

Subject:

Reference: Construction Drawing: Specification (Section and Page):

REQUEST
The following change is requested:

Change Requested By (Name): Date:

Response Requested By (Date):

Received by CM (Date):

Benefit to Owner:

Benefit to Contractor:

Cost and/or Schedule Impact:

Change Order Required or Proposed? ____ YES ____ NO

RESPONSE

Page 850 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-10
Response to Change Request: (1)

RESPONSE (Continued)

Response By (Name): Date:
(1) It is understood that certain RFCs can be responded to promptly, with minimal expenditures required by Owner. It is also understood that other RFCs require significant expenditures by Owner in order to properly evaluate and respond to Contractor's RFC. For those RFCs that fall in the latter category, Owner will provide an estimate (time and money) to Contractor as an initial response to RFC. Con- tractor may then elect to have Owner proceed with evaluating Contractor's RFC (with estimated value deducted from Contractor's Contract with Owner), or elect to withdraw Contractor's RFC.

Final Distribution:

Page 851 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-11
END OF SECTION 013100

Page 852 of 1492 ends

CITY OF BEAUMONT PROJECT MANAGEMENT AND COORDINATION
BEAUMONT MESA L-S FORCE MAIN 013100-12

THIS PAGE INTENTIONALLY LEFT BLANK

Page 853 of 1492 ends

CITY OF BEAUMONT SAFETY
BEAUMONT MESA L-S FORCE MAIN 013130 - 1

SECTION 013130 - SAFETY
PART 1 - GENERAL

1.1 SUMMARY
A. Contractor’s safety program shall conform to the requirements specified in the General Conditions.

B. This specification provides general guidance for site safety and a site safety program.

1.2 DEFINITIONS
A. For the purposes of this Section, an “active construction area” is any area where construction activities are occurring or construction activities could be considered a potential hazard to people.

B. A “Designated Safety Officer” or “Safety Representative” for the purposes of this Contract, means anyone who is capable of identifying the existing and predictable hazards in the areas surrounding a construction project or those working conditions at a construction project that are unsanitary or dangerous to employees. A “Designated Safety Officer” has the authority to make prompt corrective measures to eliminate those hazards.

C. For the purposes of this Section, a “classified area” represents any area within the classified boundary or envelope of an active wastewater treatment process basin, channel, or other facility.

A table summarizing the classified areas present within the boundaries and scope of this project is provided in paragraph 1.4 of this Section.

1.3 SUBMITTALS
A. Demonstrate compliance action with the stipulations of California Occupational Safety and Health Administration (CAL OSHA), Mine Safety and Health Administration (MSHA), and other applicable local, state, and federal safety requirements by submitting to Engineer a copy of all safety plans, programs, and permits. Such plans and programs shall include, but are not limited to:

1. Hazard Analysis Prior to Major Activities (job safety analysis, JSA).

2. Emergency Plan.

3. Rigging and Hoisting Plans.

4. Excavation and Trenching Plans.

5. Respiratory Protection Program.

6. Fire Protection Plan.

7. Confined Space Entry Program.

8. Explosives Handling and Storage.

9. Confined Space Entry Program.

10. Electrical Safety (drop cords, temporary power, GFCI’s, etc.)

11. Lock Out/Tag Out.

12. Fall Protection.

13. Heavy Equipment Operations.

14. Burning and Welding Operations.

Page 854 of 1492 ends

CITY OF BEAUMONT SAFETY
BEAUMONT MESA L-S FORCE MAIN 013130 - 2

15. Training Plan.

16. Tunneling/Underground/Jacking/Boring Operations.

17. Project Site Rules and Regulations (hazard protection plan).

18. Material Handling (storage-disposal).

19. Fuel Storage and Refueling.

20. Hazard Communication/Right to Know.

21. Subcontractor Requirements.

22. Ventilation.

23. Personal Protective Equipment (hearing, eye, face).

24. Power Transmission/Distribution (temporary and/or permanent).

25. Crossing other utilities

26. Traffic Control.

27. Environmental Controls.

28. Safety Meetings.

29. Spill Control Plan.

30. First Aid Facilities.

B. Engineer’s receipt of safety plans or programs will not relieve Contractor in any way from the full and complete responsibility for safety and training of its personnel, and the onsite personnel of Owner, Engineer, and other visitors to areas of active construction areas. On a daily basis, inform Engineer of changes to the boundaries of the active construction areas.

C. Be responsible for safety training all personnel who will have access to the active construction areas to meet state, federal, local and Contractor requirements. Maintain reasonable, regularly scheduled training sessions in mutually accessible facilities through entire Contract. Training costs for all personnel and visitors, except those costs associated with training personnel of Contractor, subcontractors, suppliers, and visitors will be considered incidental to other lump-sum portions of the Work and no additional compensation for such training will be provided.

D. Safety Program Requirements:

1. Safety Representative Requirements:
a. Assign a full-time Safety Representative.
b. The Safety Representative’s duties and responsibilities will be hazard recognition, accidents prevention, new employee orientation (including subcontractors), and the maintaining and supervising of safety precautions and program. This person shall have no other duties. The Safety Representative or a qualified and approved deputy shall be onsite at all times while Work is ongoing. c. Qualifications of the Safety Representative and assigned deputies shall be submitted to Engineer for review. Acceptance of their qualifications by Engineer is required prior to the start of any activity on the Project. The Safety Representative will, as a minimum, meet the requirements of regulations per the CAL OSHA Enforcement Branch Program.

2. Hazardous Substances:
a. Provide Engineer with a list of all hazardous substances anticipated to be brought on-site.
b. Maintain on site Material Safety Data Sheets (MSDS) prior to arrival of any hazardous substances on the Project.
c. Use storage area(s) as outlined in the spill control plan.

3. Job Safety Analysis (JSA):
a. Outline the sequence of the Work, equipment to be used, identify hazards that may exist or may be created and what procedures and/or safety equipment will be used

Page 855 of 1492 ends

CITY OF BEAUMONT SAFETY
BEAUMONT MESA L-S FORCE MAIN 013130 - 3

to eliminate or reduce these hazards. A Scope of Work JSA shall be prepared and provided to the Engineer prior to the start of unusual, hazardous, or have ri sk potential activities on the Project. The name of the competent person assigned to this activity will be included on the JSA.
b. Complete a JSA for any activity, which may be of an unusual nature or involves unique hazards.

4. Reports
a. Provide to Engineer copies of Contractor’s and subcontractor’s:
1) First aid, recordable, lost time and near miss, monthly logs. 2) OSHA 200 injury log (annually).
3) Safety meeting reports and topics (weekly).
4) List of competent persons as required by OSHA and the Project Health and Safety Manual for each required task and their qualification as such. 5) Injury and accident reports will be submitted to Engineer within 24 hours of any incident. Immediate notification to Engineer of an accident is required. Full cooperation with Engineer in accident investigation is required.
b. Conduct weekly safety inspections. Corrective actions shall be taken within 24 hours to address all deficiencies identified during inspections. Deficiency reports shall be prepared and submitted to Engineer within 48 hours indicating corrective actions taken. Failure to comply with required corrective measures identified in the safety inspection will result in the delayed signing of the monthly application for progress payment by Engineer.
c. Provide Engineer with a report of any periodic audit of Contractor’s safety performance and/or records.

1.4 CLASSIFIED AREAS
A. The adjacent site is an active wastewater lift station that must remain operational and online at all times. Consequently, construction activities for this project will involve working near equipment that must remain online and operational. In addition to the usual hazards of open, deep structures, manholes and equipment/machinery that is actively operating, many of these structures are considered classified zones (per NFPA 820) with potential hazards for fire and explosions due to the presence of explosive gases associated with wastewater.

B. Contractor shall take all additional precautions necessary when working within the classified zones and envelopes in these areas to prevent sparks, open flames, ignitions, and reduce the risk of fire or explosion. Precautions include but are not limited to: reviewing classified areas with all workers and subcontractors as part of the regular safety meetings and site orientation; providing proper PPE for workers entering classified areas; avoid using electrical tools, plugs, extension cords, welding equipment, open flames/heaters, and other potential sources for sparks or ignition within the classified envelopes; and following all guidelines and recommendations provided in NFPA and CALOSHA for working in classified areas,
C. Refer to Electrical Site Layout Drawings for NFPA 820 classified areas if needed.

END OF SECTION 013130

Page 856 of 1492 ends

CITY OF BEAUMONT SAFETY
BEAUMONT MESA L-S FORCE MAIN 013130 - 4

THIS PAGE INTENTIONALLY LEFT BLANK

Page 857 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 1 SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's construction schedule.

2. Construction schedule updating reports.

3. Daily construction reports.

4. Site condition reports.

1.2 RELATED SECTIONS:

A. General Conditions
B. Section 013300 “Contractor Submittals”

1.3 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must sta rt and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

C. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

D. Float: The measure of leeway in starting and completing an activity.

1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date.

Page 858 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 2

1.4 INFORMATIONAL SUBMITTALS
A. Format for Submittals: Submit required submittals in the following format:

1. Working electronic copy of schedule file, where indicated.

2. PDF electronic file.

3. Two (2) paper copies.

B. Startup Network Diagram: Of size required to display entire network for entire construction period. Show logic ties for activities.

C. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

1. Submit a working electronic copy of schedule labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.

D. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for each activity in reports shall contain activity number, activity description, original duration, remaining duration, early start date, early finish date, late start date, late finish date, and total float in calendar days.

1. Activity Report: List of all activities sorted by activity number and then early start date, or actual start date if known.

2. Logic Report: List of preceding and succeeding activities for all activities, sorted in ascending order by activity number and then early start date, or actual start date if known.

3. Total Float Report: List of all activities sorted in ascending order of total float.

4. Earnings Report: Compilation of Contractor's total earnings from the Notice to Proceed until most recent Application for Payment.

E. Construction Schedule Updating Reports: Submit with Applications for Payment.

F. Daily Construction Reports: Submit at weekly intervals to the Construction Manager.

G. Site Condition Reports: Submit at time of discovery of differing conditions.

1.5 COORDINATION
A. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

Page 859 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 3 PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of final completion.

1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.

B. Activities: Treat each separate area as a separate numbered activity for each main element of the Work. Comply with the following:

1. Activity Duration: Define activities so no activity is longer than twenty (20) days, unless specifically allowed by Engineer.

2. Procurement Activities: Include procurement process activities for the long lead items , major items, and Owner Selected equipment requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.

3. Submittal Review Time: Include review and resubmittal times in schedule as indicated in Section 013300 "Contractor Submittals." Coordinate submittal review times in Contractor's construction schedule with submittal schedule.

4. Startup and Testing Time: Include no fewer than fifteen (15) days for startup and testing.

5. Substantial Completion: Indicate completion in advance of date established for Substantial Completion and allow time for Engineer's and Construction Manager's administrative procedures necessary for certification of Substantial Completion.

6. Punch List and Final Completion: Include not more than thirty (30) days for completion of punch list items and final completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Work under More Than One Contract: Include a separate activity for each contract.

3. Work by Owner: Include a separate activity for each portion of the Work performed by Owner.

4. Work Restrictions: Show the effect of the following items on the schedule:
a. Coordination with existing construction.
b. Limitations of continued occupancies.
c. Uninterruptible services.
d. Partial occupancy before Substantial Completion.
e. Use of premises restrictions.
f. Provisions for future construction.
g. Seasonal variations.
h. Environmental control.

5. Work Stages: Indicate important stages of construction for each major portion of the Work.

Page 860 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 4 D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion.

E. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or commence prior to submittal of next schedule update. Summarize the following issues:

1. Unresolved issues.

2. Unanswered Requests for Information.

3. Rejected or unreturned submittals.

4. Notations on returned submittals.

5. Pending modifications affecting the Work and Contract Time.

F. Recovery Schedule: When periodic update indicates the Work is fourteen (14) or more calendar days behind the current approved schedule, submit a separate recovery schedule indicating means by which Contractor intends to regain compliance with the schedule.

G. Computer Scheduling Software: Prepare schedules using current version of a program that has been developed specifically to manage construction schedules.

2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE)
A. General: Prepare a computerized Work Break Down schedule utilizing Primavera Project Management, most current version.

B. Startup Network Diagram: Submit diagram within fourteen (14) days of date established for the Notice to Proceed. Outline significant construction activities for the first ninety (90) days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities.

C. CPM Schedule: Prepare Contractor's construction schedule using a time-scaled CPM network analysis diagram for the Work.

1. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted for use no later than sixty (60) days after date established for the Notice to Proceed.
a. Failure to include any work item required for performance of this Contract shall not excuse Contractor from completing all work within applicable completion dates, regardless of Engineer's approval of the schedule.

2. Establish procedures for monitoring and updating CPM schedule and for reporting progress. Coordinate procedures with progress meeting and payment request dates.

3. Use "one workday" as the unit of time for individual activities. Indicate nonworking days and holidays incorporated into the schedule in order to coordinate with the Contract Time.

D. CPM Schedule Preparation: Prepare a list of all activities required to complete the Work.

Using the startup network diagram, prepare a skeleton network to identify probable critical paths.

Page 861 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 5

1. Activities: Indicate the estimated time duration, sequence requirements, and relationship of each activity in relation to other activities. Include estimated time frames for the following activities:
a. Preparation and processing of submittals.
b. Mobilization and demobilization.
c. Purchase of materials.
d. Delivery.
e. Fabrication.
f. Utility interruptions.
g. Installation.
h. Work by Owner that may affect or be affected by Contractor's activities. i. Testing and commissioning.
j. Punch list and final completion.
k. Activities occurring following final completion.

2. Critical Path Activities: Identify critical path activities, including those for interim completion dates. Scheduled start and completion dates shall be consistent with Contract milestone dates.

3. Processing: Process data to produce output data on a computer-drawn, time-scaled network. Revise data, reorganize activity sequences, and reproduce as often as necessary to produce the CPM schedule within the limitations of the Contract Time.

4. Format: Mark the critical path. Locate the critical path near center of network; locate paths with most float near the edges.
a. Sub networks on separate sheets are permissible for activities clearly off the critical path.

E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using a network fragment to demonstrate the effect of the proposed change on the overall project schedule.

F. Initial Issue of Schedule: Prepare initial network diagram from a sorted activity list indicating straight "early start-total float." Identify critical activities. Prepare tabulated reports showing the following:

1. Contractor or subcontractor and the Work or activity.

2. Description of activity.

3. Main events of activity.

4. Immediate preceding and succeeding activities.

5. Early and late start dates.

6. Early and late finish dates.

7. Activity duration in workdays.

8. Total float or slack time.

9. Average size of workforce.

10. Dollar value of activity (coordinated with the schedule of values).

G. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports showing the following:

1. Identification of activities that have changed.

Page 862 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 6

2. Changes in early and late start dates.

3. Changes in early and late finish dates.

4. Changes in activity durations in workdays.

5. Changes in the critical path.

6. Changes in total float or slack time.

7. Changes in the Contract Time.

H. Responsible Person:

1. Designate, in writing and within five (5) calendar days after Notice of Award, person responsible for preparation, maintenance, updating, and revision of all schedules.

2. Qualifications of Responsible person:
a. Authority to act on behalf of Contractor.
b. 5 years verifiable experience in preparation of complex construction schedules for projects of similar value, size, and complexity.
c. Knowledge of critical path method (CPM) scheduling utilizing Primavera Project Planner software.

3. References: Submit written reference of 3 project Owners who have personal experience with this scheduler on previous projects. Identify name, address, telephone number , project name, and cost.

4. Scheduler: Dedicated full time to this project, located on-site. All scheduling software and hardware located on-site. Scheduler will attend all project meetings called for as specified in section 013100.

5. Engineer reserves the right to disapprove scheduler when submitted by Contractor if not qualified. Engineer reserves the right to remove the scheduler from the project if found to be incompetent.

2.3 REPORTS
A. Daily Construction Reports: The Contractor shall prepare a daily construction report recording the following information concerning events at Project site:

1. List of subcontractors at Project site.

2. List of separate contractors at Project site.

3. Approximate count of personnel at Project site.

4. Equipment at Project site.

5. Material deliveries.

6. High and low temperatures and general weather conditions, including presence of r ain or snow.

7. Accidents.

8. Meetings and significant decisions.

9. Unusual events.

10. Stoppages, delays, shortages, and losses.

11. Meter readings and similar recordings.

12. Emergency procedures.

13. Orders and requests of authorities having jurisdiction.

14. Change Orders received and implemented.

15. Work Change Directives received and implemented.

16. Services connected and disconnected.

17. Equipment or system tests and startups.

18. Partial completions and occupancies.

Page 863 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 7

19. Substantial Completions authorized.

B. Site Condition Reports: Immediately on discovery of a difference between site conditions and the Contract Documents, prepare and submit a detailed report. Submit with a Request for Information. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents.

C. Quarterly Reports: The Contractor shall assist the Engineer, as requested, in preparing quarterly reports, which shall include at a minimum, the following:

1. A summary of progress to date including a description of progress since the last report, percent construction complete, percent contractor invoiced, and percent schedule elapsed.

2. A description of compliance with environmental requirements.

3. A listing of change orders including amount, description of work, and change in contract amount and schedule.

4. Any problems encountered, proposed resolution, schedule for resolution, and status of previous problem resolutions.

PART 3 - EXECUTION

3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.

1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.

2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.

3. As the Work progresses, indicate final completion percentage for each activity.

B. Distribution: Distribute copies of approved schedule to Engineer, Construction Manager, Owner, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.

1. Post copies in Project meeting rooms and temporary field offices.

2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.

END OF SECTION 013200

Page 864 of 1492 ends

CITY OF BEAUMONT CONSTRUCTION PROGRESS DOCUMENTATION
BEAUMONT MESA L-S FORCE MAIN 013200 - 8

THIS PAGE INTENTIONALLY LEFT BLANK

Page 865 of 1492 ends

CITY OF BEAUMONT CONTRACTOR SUBMITTALS
BEAUMONT MESA L-S FORCE MAIN 013300 - 1

SECTION 013300 – CONTRACTOR SUBMITTALS
PART 1 - GENERAL

1.1 SUMMARY
A. Section includes requirements for the submittal schedule and administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other submittals. The Contractor shall coordinate the submittal requirements in this section with those given in the General and Special Conditions of Volume 1, “Bid and Contract Documents.” Where discrepancies exist, the requirements of Volume 1 shall govern.

B. Related Requirements:

1. Section 013200 “Construction Progress Documentation” for submitting schedules and reports, including Contractor's construction schedule.

2. Section 017823 "Operation and Maintenance Data" for submitting operation and maintenance manuals.

3. Section 017839 "Project Record Documents" for submitting record Drawings, record Specifications, and record Product Data.

1.2 DEFINITIONS
A. Action Submittals: Written and graphic information and physical samples that require Engineer's responsive action.

B. Informational Submittals: Written and graphic information and physical samples that do not require Engineer's responsive action. Submittals may be rejected for not complying with requirements.

1.3 ACTION SUBMITTALS
A. Submittal Schedule: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Engineer and additional time for handling and reviewing submittals required by those corrections.

B. Construction Schedule: Within fourteen (14) days after the date of Notice to Proceed, the Contractor shall submit a construction schedule providing the starting and completion dates of the various stages of the Work. The Contractor shall be prepared to discuss its construction schedule at the pre-construction conference.

Page 866 of 1492 ends

CITY OF BEAUMONT CONTRACTOR SUBMITTALS
BEAUMONT MESA L-S FORCE MAIN 013300 - 2
C. Schedule of Values or lump sum price breakdown: Within fourteen (14) days after the date of Notice to Proceed, the Contractor shall submit a schedule of values or lump sum price breakdown for progress payment purposes.

1.4 SUBMITTAL ADMINISTRATIVE REQUIREMENTS
A. Engineer's Digital Data Files: Electronic copies of digital data files of the Contract Drawings will be provided by Engineer for Contractor's use in preparing submittals.

1. Engineer will furnish Contractor one set of digital data drawing files of the Contract Drawings for use in preparing Shop Drawings.
a. Engineer makes no representations as to the accuracy or completeness of digital data drawing files as they relate to the Contract Drawings. b. Contractor shall execute a data licensing agreement in the form of Agreement form acceptable to Owner and Engineer.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. The Engineer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

Time for review shall commence on Engineer's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

1. Initial Review: Allow fifteen calendar (15) days for initial review of each submittal.

Allow additional time if coordination with subsequent submittals is required. Engineer will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow fifteen (15) days for review of each resubmittal.

4. Submittal Copies: Unless additional copies are required for final submittal, and unless Engineer observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.

D. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:

Page 867 of 1492 ends

CITY OF BEAUMONT CONTRACTOR SUBMITTALS
BEAUMONT MESA L-S FORCE MAIN 013300 - 3

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier. a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LNHS-061000.01).

Resubmittals shall include an alphabetic suffix after another decimal point (e.g., LNHS-061000.01.A)

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Engineer.

4. Transmittal Form for Electronic Submittals: Use electronic form acceptable to Owner, containing the following information:
a. Project name.
b. Date.
c. Name and address of Engineer.
d. Name of Construction Manager.
e. Name of Contractor.
f. Name of firm or entity that prepared submittal.
g. Names of subcontractor, manufacturer, and supplier.
h. Category and type of submittal.
i. Submittal purpose and description.
j. Specification Section number and title.
k. Specification paragraph number or drawing designation and generic name for each of multiple items.
l. Drawing number and detail references, as appropriate. m. Location(s) where product is to be installed, as appropriate. n. Related physical samples submitted directly.
o. Indication of full or partial submittal.
p. Transmittal number.
q. Submittal and transmittal distribution record.
r. Other necessary identification.
s. Remarks.

5. Metadata: Include the following information as keywords in the electronic submittal file metadata:
a. Project name.
b. Number and title of appropriate Specification Section. c. Manufacturer name.
d. Product name.

E. Options: Identify options requiring selection by Engineer.

F. Deviations: Identify deviations from the Contract Documents on submittals.

G. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.