1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver the process measurement equipment as a complete system. Each system shall be properly tagged and identified with its corresponding instrument tag as shown on the P&ID 's and as required in section 26 05 00. Each system shall be factory calibrated and certified prior to delivery.
PART 2 - PRODUCTS
2.1 GENERAL
A. Each diaphragm seal shall consist of a diaphragm, fill fluid, and piping connection for mounting of transmitter. Each unit shall be arranged and designed to directly transmit the process measure by means of fluid through an opening in the lower housing to a pressure sensing device attached and sealed to the upper housing. Diaphragm seals shall be factory assembled to the pressure sensing device.
B. All diaphragm seals shall be made from corrosion resistant materials.
2.2 PRESSURE PROCESS MEASUREMENT DEVICES
A. Annular Ring Diaphragm Seals
1. The pressure sensing ring shall measure pressure for 360 degrees around the full inside circumference of the pipeline. The sensing ring shall also be clamped into the body for the full radial width of the sensor. Pressure shall be transmitted to the gauge by a locked in and sealed fluid such as ethylene glycol or silicone oil. The annular seal shall be factory - assembled to the corresponding pressure instrument and be factory filled. The assembly shall be shipped with a tag stating, "Do not disassemble for installation."
2. The annular ring shall be rated for ASME classes 150 and 300. It shall be constructed of carbon steel. Instrument connection shall be '/4" NPT.
3. The inside diameter of the sensor shall be the same as the mating pipe for a full uninterrupted flow. There shall be no dead ends or crevices, and flow passage shall make the sensor self-cleaning. The sensor shall have an auxiliary tapped and plugged port to allow connection of other equipment.
4. Wetted parts (liner) shall be capable for continuous duty handling a slurry containing 15 percent solids in a hydrocarbon oil similar to kerosene at temperatures up to 225 degrees F.
5. Acceptable Manufacturers:
a. Ashcroft model 80.
b. Red Valve Series 48W.
c. Noshok Type 40
CITY OF BEAUMONT DIAPHRAGM SEALS
MESA LIFT STATION UPGRADE 407363-2
PART 3 - EXECUTION
3.1 INSTALLATION
A. Equipment and materials specified in this section shall be installed, connected, and tested in accordance with the manufacturers' recommendations and as required by these specifications and contract drawings. Contractor shall coordinate with other trades to insure proper connection to piping and other mechanical equipment.
3.2 CALIBRATION AND COMMISSIONING
A. A manufacturer representative shall field calibrate the process measurement system as required by section 40 61 21 and per the manufacturer's documented calibration procedure. The system shall be calibrated to the proper ranges as required by the Owner and the Engineer. Where analog signals are connected to local or remote monitoring equipment, verify that the calibrated ranges and scaling of the local and remote indicators are correct.
B. Prior to final acceptance of the work, the Contractor shall certify the equipment and installation included under this section to be free of defects, and suitable for trouble -free operation.
3.3 FIELD QUALITY CONTROL
A. Tests and Inspections:
1. Visually inspect the installation of the process measurement systems. Verify that the incoming power is within the required range. Verify the functionality of all output signals and communications connections.
2. Test the process measurement system for proper operation at low, mid, and high process conditions.
B. Document data for each measurement and for system calibration. Update the TR20 instrument forms following testing and calibration. These shall be submitted as part of the O&M manual as called for in section 40 61 13.
3.4 TRAINING
A. Provide a minimum of four hours of training for each type of process measurement system provided. Provide training in accordance with section 40 61 26.
END OF SECTION 40 73 63
CITY OF BEAUMONT DIAPHRAGM SEALS
MESA LIFT STATION UPGRADE 407363-3
THIS PAGE INTENTIONALLY LEFT BLANK
CITY OF BEAUMONT DIAPHRAGM SEALS
MESA LIFT STATION UPGRADE 407363-4
SECTION 40 76 00 — PROCESS GAS ANALYTICAL MEASUREMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Process gas analyzers provide continuous gas measurement of the specified gases in the process or ambient environment.
1.2 ACTION SUBMITTALS
A. Product Data:
1. Dimensional Drawings
2. Materials of Construction
3. Measurement Accuracy
4. Range and range ability
5. Enclosure Rating
6. Classification Rating
7. Power
8. Output options
B. Instrumentation TR20 forms.
1.3 INFORMATIONAL SUBMITTALS
A. All submittals as required in 40 61 13.
1.4 QUALITY ASSURANCE
A. Equipment to be furnished under this section shall be the product of firms regularly engaged in the design and manufacturing of this type of equipment. Manufacturer shall assume responsibility for, and guarantee performance of equipment furnished. However, this shall not be construed as relieving the Contractor from responsibility for the proper installation and functionality of the work.
B. Examine the Contract Documents and verify that instruments being provided are compatible with the physical and process conditions associated with the instrument. This includes compatibility with liquids, gases, pressures, temperatures, flows, materials, locations, and mounting requirements. Provide all necessary accessories to the instrument for a complete and operable system.
C. All process lower and upper ranges to be coordinated with Engineer prior to instrument submittals being submitted.
CITY OF BEAUMONT PROCESS GAS ANALYTICAL MEASUREMENT
MESA LIFT STATION UPGRADE 407600-1
1.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver the process measurement equipment as a complete system. Each system shall be properly tagged and identified with its corresponding instrument tag as shown on the P&ID 's and as required in section 26 05 00. Each system shall be factory calibrated and certified prior to delivery.
PART 2 - PRODUCTS
2.1 GENERAL
A. Each process measurement system shall consist of a sensor and an analyzer. Where shown on the drawings, the analyzer may be utilized for multiple sensors. When an analyzer is used for multiple sensors, it shall be capable of displaying simultaneously each process measurement.
B. Each analyzer shall be equipped with means to transmit process measurement information to the plant SCADA system.
1. For hardwired signals, unless otherwise indicated on the drawings, provide the following:
a. 4-20mA output signal for each process measurement (for up to 500 Ohm loads) b. Two programmable SPDT relay outputs, rated at 5A up to 230VAC, for each process measurement
2. Where shown on the drawings, provide the following digital communications to the plant SCADA system:
a. Modbus RTU (Two -Wire RS -485)
C. Each analyzer shall be powered by 24VDC (+/- 15%) unless specifically shown on the drawings as 115VAC (+/- 10%). Each analyzer shall retain its programmable settings in non-volatile memory.
D. Each sensor and corresponding analyzer shall be supplied as a complete and operable system.
This includes all cabling, mounting hardware and fasteners. When installed outdoors, the analyzer shall be protected from the sun such that direct sunlight will not shine on the display.
E. All analyzers shall be waterproof and made from corrosion resistant materials.
F. All sensors shall be rated for permanent submersion and shall be corrosion resistant.
2.2 GAS ANALYSIS PROCESS MEASUREMENT DEVICES
A. Each gas sensor/analyzer shall be provided with a NEMA 4X rating for unclassified areas and NEMA 7 ratings (explosion -proof) for classified areas and specifically listed for Class 1, Division 1 groups B, C and D.
B. All gas analyzers shall be 24VDC powered. Unless specifically indicated otherwise on the drawings, provide for each building with any gas analyzers a 24VDC power supply housed inside of a NEMA 4X enclosure.
CITY OF BEAUMONT PROCESS GAS ANALYTICAL MEASUREMENT
MESA LIFT STATION UPGRADE 407600-2
C. All analyzers shall have a 4-20mA output for each gas being detected capable of driving a 500 - ohm loop load. All analyzers shall have programmable relays rated at 5A up to 230VAC for wiring to a PLC, Horn and/or beacon.
D. Furnish and install a sampling pump module where required to draw an air sample into the analyzer sensor.
E. Infrared type sensors shall be supplied when available for gases being detected.
F. Provide maintenance and calibration equipment necessary to maintain and calibrate the gas analyzers for a period of three years.
G. The following gas detection configurations shall be considered as standard unless shown otherwise on the drawings:
1. Combustible Gas: 0-100% LEL
H. The gas analyzers shall be furnished with a display that indicates the measured gas level.
I. Acceptable Manufacturers:
1. MSA Ultima X Series
2. Det-tronics
PART 3 - EXECUTION
3.1 INSTALLATION
A. Equipment and materials specified in this section shall be installed, connected, and tested in accordance with the manufacturers' recommendations and as required by these specifications and contract drawings. Contractor shall coordinate with other trades to insure proper connection to piping and other mechanical equipment.
B. Install all analyzers five feet above floor level. Install in a location that is easily accessible while as near to the sensor(s) as possible.
3.2 CALIBRATION AND COMMISSIONING
A. A manufacturer representative shall field calibrate the process measurement system as required by section 40 61 21 and per the manufacturer's documented calibration procedure. The system shall be calibrated to the proper ranges as required by the Owner and the Engineer. Where analog signals are connected to local or remote monitoring equipment, verify that the calibrated ranges and scaling of the local and remote indicators are correct.
B. Prior to final acceptance of the work, the Contractor shall certify the equipment and installation included under this section to be free of defects, and suitable for trouble -free operation.
3.3 FIELD QUALITY CONTROL
A. Tests and Inspections:
CITY OF BEAUMONT PROCESS GAS ANALYTICAL MEASUREMENT
MESA LIFT STATION UPGRADE 407600-3
1. Visually inspect the installation of the process measurement systems. Verify that the incoming power is within the required range. Verify the functionality of all output signals and communications connections.
2. Test the process measurement system for proper operation at low, mid, and high process conditions.
B. Document data for each measurement and for system calibration. Update the TR20 instrument forms following testing and calibration. These shall be submitted as part of the O&M manual as called for in section 40 61 13.
3.4 TRAINING
A. Provide a minimum of four hours of training for each type of process measurement system provided. Provide training in accordance with section 40 61 26.
END OF SECTION 40 76 00
CITY OF BEAUMONT PROCESS GAS ANALYTICAL MEASUREMENT
MESA LIFT STATION UPGRADE 407600-4
SECTION 432010 - PUMPS, GENERAL
PART 1 - GENERAL
1.1 THE REQUIREMENT
A. The Contractor shall provide all pumps and pumping appurtenances, complete and operable, in accordance with the Contract Documents.
B. The provisions of this Section shall apply to all pumps and pumping equipment except where otherwise indicated in the Contract Documents.
C. Unit Responsibility: A single manufacturer shall be made responsible for furnishing the Work and for coordination of design, assembly, testing, and installation of the Work of each pump Section; however, the Contractor shall be responsible to the Owner for compliance with the requirements of each pump Section. Unless otherwise indicated, the single Manufacturer shall be the Manufacturer of the pump.
D. Single Manufacturer: Where two or more pump systems of the same type or size are required, the pumps shall all be produced by the same Manufacturer.
1.2 CONTRACTOR SUBMITTALS
A. General: Submittals shall be furnished in accordance with Section 013300 — Contractor Submittals.
B. Shop Drawings: Shop drawings shall contain the following information:
1. Pump name, identification number, and specification Section number.
2. Performance data curves showing head, capacity, horsepower demand, NPSH required, and pump efficiency over the entire operating range of the pump. The equipment Manufacturer shall indicate separately the head, capacity, horsepower demand, overall efficiency, and minimum submergence required at the design flow conditions and the maximum and minimum flow conditions. A family of performance curves at intervals of 100 rpm from minimum speed to maximum speed shall be provided for each centrifugal pump equipped with a variable frequency drive.
3. The Contractor shall require the Manufacturer to indicate on the performance curves the limits recommended for stable operation without surge, without cavitation, and without vibration (except vibration within specified allowable limits). The stable operating range shall be as wide as possible based on actual hydraulic and mechanical measurements taken during the factory performance tests of the pumps.
4. Assembly and installation drawings including shaft size, seal, coupling, bearings, anchor bolt plan, part nomenclature, material list, outline dimensions, and shipping weights.
5. Data, in accordance with Division 11 and 26 for the electric motor proposed for each pump.
6. Elevation of proposed Local Control Panel showing panel -mounted devices, details of enclosure type, single line diagram of power distribution, and current draw of panel, and list of all terminals required to receive inputs or to transmit outputs from the Local Control Panel.
7. Wiring diagram of field connections with identification of terminations between Local Control Panels, junction terminal boxes, and equipment items.
8. Complete electrical schematic diagram.
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 1
C. Operation and Maintenance Manual: The Manual shall contain the required information for each pump Section.
D. Anchorage: The manufacturer shall provide anchor bolt design calculations in accordance with the latest edition of CBC, stamped and signed by a licensed professional engineer in the State of California.
E. Spare Parts List: A Spare Parts List shall contain the required information for each pump Section.
F. Factory Test Data: Signed, dated, and certified factory test data for each pump system which requires factory testing, submitted before shipment of equipment.
G. Certifications
1. Manufacturer's certification of proper installation.
2. Contractor's certification of satisfactory field testing.
1.3 QUALITY ASSURANCE
A. Factory Testing: The following tests shall be conducted on each indicated pump system:
1. Motors: All motors of sizes 100 hp and larger shall be assembled, tested, and certified at the motor factory and the working clearances checked to insure that all parts are properly fitted. The tests shall be in accordance with ANSI/IEEE 112 - Test Procedure for Polyphase Induction Motors and Generators, and ANSI/IEEE 115 - Test Procedure for Synchronous Machines, including heat run and efficiency tests. All computations shall be recorded and certified and dated copies of the test results shall be furnished.
2. Pump Systems: All centrifugal pump systems 100 hp and larger shall be tested at the pump factory in accordance with the Test Code for Centrifugal Pumps of the Standards of the Hydraulic Institute, Inc. Tests shall be performed using the complete pump system to be furnished, including the motor.
3. For motors smaller than 100 hp, the Manufacturer's certified test motor shall be acceptable.
Testing of prototype models will not be acceptable. The following minimum test data shall be submitted:
a. Hydrostatic test data
b. A minimum of five hydraulic test readings between shutoff head and 25 percent beyond the maximum indicated capacity, recorded on data sheets as defined by the Hydraulic Institute.
c. Pump curves showing head, flow, bhp, efficiency, and NPSH requirements. d. Certification that the pump horsepower demand did not exceed the rated motor hp beyond the 1.0 service rating at any point on the curve.
4. Factory Witnessed Tests: All pumps, variable speed drives, and motors, 150 hp and larger shall be factory -tested as complete assembled systems and may be witnessed by the Owner and Engineer. The use of one of each type project motor and variable frequency drive for testing all pumps shall be acceptable. The Contractor shall give the Engineer a minimum of 4 weeks notification prior to the test. All costs for Owner and Engineer expenses shall be borne by the Contractor and shall be included in the bid price. Such costs shall include travel and subsistence for two people excluding salaries. Test results shall be submitted to the Engineer and no equipment shall be shipped until the test data have been approved by the Engineer.
B. Warranty: Unless otherwise specified, each pump shall be supplied with manufacturer's standard warranty of one (1) year from substantial completion.
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 2
PART 2 - PRODUCTS
2.1 GENERAL
A. Compliance with the requirements of the individual pump Sections may necessitate modifications to the Manufacturer's standard equipment.
B. Performance Curves: All centrifugal pumps shall have a continuously rising curve. In no case shall the required horsepower at any point on the performance curve exceed the rated horsepower of the motor or engine, or encroach on the service factor.
C. No cavitation shall be allowed in pumps operating within the stable operating range for the specified operating conditions. For the purposes of this provision, cavitation shall be recognized and accepted as being present in a pumping unit if cavitation noise can be perceived either by the human ear or by acoustic instruments or devices. The presence or absence of cavitation noise shall be verified by the Owner during both the factory performance tests of the pumps and during operation of the pumps up to the end of the warranty period. To assist in revealing potential cavititation during the factory performance tests, in addition to all other required tests, the Manufacturer shall force the pumps to operate at the specified minimum net positive suction head available for each of the following conditions: minimum flow rate, design flow rate and head, and maximum flow rate.
D. All components of each pump system provided under the pump Sections shall be entirely compatible. Each unit of pumping equipment shall incorporate all basic mechanisms, couplings, electric motors, variable frequency controls if required, necessary mountings, and appurtenances.
2.2 MATERIALS OF CONSTRUCTION
A. All materials shall be suitable for the intended application; materials not specified shall be high- grade, standard commercial quality, free from all defects and imperfection that might affect the serviceability of the product for the purpose for which it is intended, and shall conform to the following requirements:
1. Cast iron pump casings and bowls shall be of austenitic ductile iron, conforming to ASTM A 439 - Specification for Austenitic Ductile Iron Castings, or equal.
2. Bronze pump impellers shall conform to ASTM B 62 - Specification for Composition Bronze or Ounce Metal Castings, or B 584 - Specification for Copper Alloy Sand Castings for General Applications, where dezincification does not exist.
3. Stainless steel pump shafts shall be Type 416 or 316. Miscellaneous stainless steel parts shall be of Type 316.
4. All anchor bolts, nuts, and washers that are not buried or submerged shall be hot -dip galvanized, unless otherwise specified in individual pump Sections. Buried or submerged bolts, nuts, and washers shall be stainless steel in accordance with Section 055000 — Metal Fabrications.
2.3 PUMP COMPONENTS
A. Flanges: Suction and discharge flanges shall conform to ANSUASME B16.1 - Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250, and 800 or B16.5 - Pipe Flanges and Flanged Fittings Dimensions.
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 3
B. Lubrication: Vertical pump shafts of clean water pumps shall be product water -lubricated, unless otherwise specified. Deep -well pumps and pumps with dry barrels shall have water- or oil - lubricated bearings and seals and enclosed lineshafts. Pumps for other process fluids shall be lubricated as indicated.
C. Handholes: Handholes on pump casings shall be shaped to follow the contours of the casing to avoid any obstructions in the water passage.
D. Vortex Suppressors: Vertical pumps with marginal submergence shall be provided with vortex suppressors.
E. Drains: All gland seals, air valves, cooling water drains, and drains from variable frequency drive equipment shall be piped to the nearest floor sink, or drain, with galvanized steel pipe or copper tube, properly supported with brackets.
F. Grease Lubrication: For all vertical propeller, mixed -flow, and turbine pumps, other than deep well pumps, of bowl sizes 10 -inches and larger, the Contractor shall provide a stainless steel tube attached to the column for grease lubrication of the bottom bearing.
G. Stuffing Boxes: Where stuffing boxes are indicated for the pump seal, they shall be of the best quality, using the Manufacturer's suggested materials best suited for the specific application. For drainage and liquids containing sediments, the seals shall be fresh -water flushed, using lantern rings.
1. Unless otherwise specified, the packing material shall be interlaced Teflon braiding, containing 50 percent ultrafine graphite impregnation to satisfy the following:
a. Shaft speeds - up to 2500 rpm
b. Temperature - up to 500 degrees F
c. pH range - 0 to 14.
2. If fresh water is not available, the seal shall be flushed with product water cleaned by a solids separator as manufactured by John Crane Co., Lakos (Claude Laval Corp.), or equal.
H. Mechanical Seals: Mechanical seals shall be fresh water -flushed unless indicated otherwise; in which case product water cleaned by a solids separator as above shall be used. Mechanical seals shall be as manufactured by the following, or equal:
Type
Manufacturer
Wastewater Pumps
Double seals:
John Crane Type L Double;
Borg-Warner Type L Double;
Chesterton
Abrasives, Grit, or
Lime Slurry Pumps
Double seals:
John Crane Type I (hard faces);
Borg-Warner Type L (hard faces);
Chesterton
Chemicals or Corrosive
Liquid Pumps
Single seals:
John Crane Type 8-1, 9;
Borg-Warner Type Q, QB;
Chesterton
Water Pumps
Hot and Cold
Single seals:
John Crane, Type I, 21;
Borg-Warner Type L;
Chesterton
CITY OF BEAUMONT
PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 4
I. Where indicated, a buffer fluid must be circulated a minimum 20 psi above discharge pressure, or as required by the Manufacturer, in order to maintain reliable seal performance.
J. Mechanical seals for all services other than chemicals and corrosives shall be equipped with nonclogging, single coil springs and nonsliding, internal, secondary elastomers. Metal parts shall be Type 316 stainless steel, Alloy 20, or Hastelloy B or C.
2.4 PUMP APPURTENANCES
A. Nameplates: Each pump shall be equipped with a stainless steel nameplate indicating serial numbers, rated head and flow, impeller size, pump speed, and Manufacturer's name and model number. Dimension and flow information shall be in metric units, followed by English units in parentheses.
B. Solenoid Valves: The pump Manufacturer shall provide solenoid valves on the water or oil lubrication lines and on all cooling water lines. Solenoid valve electrical ratings shall be compatible with the motor control voltage.
C. Gauges: all pumps (except sample pumps, sump pumps, and hot water circulating pumps) shall be equipped with pressure gauges installed at pump discharge lines. Pump suction lines shall be provided with compound gauges. Gauges shall be located in a representative location, where not subject to shock or vibrations, in order to achieve true and accurate readings.
1. Where subject to shock or vibrations, the gauges shall be wall -mounted or attached to galvanized channel floor stands and connected by means of flexible connectors.
2. Pressure and compound gauges shall be provided in accordance with Section 40 73 13 — Pressure Gauges.
D. Spare Parts: One full set of all recommended spare parts shall be provided with each set of pumps.
PART 3 - EXECUTION
3.1 SERVICES OF MANUFACTURER
A. Inspection, Startup, and Field Adjustment: Where required by the individual pump Sections, an authorized service representative of the Manufacturer shall visit the site for the number of days indicated in those Sections to witness the following and to certify in writing that the equipment and controls have been properly installed, aligned, lubricated, adjusted, and readied for operation.
1. Installation of the equipment.
2. Inspection, checking, and adjusting the equipment.
3. Startup and field testing for proper operation.
4. Performing field adjustments to ensure that the equipment installation and operation comply with the specified requirements.
B. Instruction of the Owner's Personnel
1. Where required by the individual pump Sections, an authorized training representative of the Manufacturer shall visit the site for the number of days indicated in those Sections to instruct the Owner's personnel in the operation and maintenance of the equipment, including step-by-step troubleshooting with necessary test equipment. Instruction shall be specific to the models of equipment provided.
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 5
2. The representative shall have at least two years' experience in training. A resume for the representative shall be submitted.
3. Training shall be scheduled a minimum of three weeks in advance of the first session.
4. Proposed training material and a detailed outline of each lesson shall be submitted for review. Comments shall be incorporated into the material.
5. The training materials shall remain with the trainees.
6. The Owner may videotape the training for later use with the Owner personnel.
3.2 INSTALLATION
A. General: Pumping equipment shall be installed in accordance with the Manufacturer's written recommendations.
B. Alignment: All equipment shall be field tested to verify proper alignment, operation as specified, and freedom from binding, scraping, vibration, shaft runout, or other defects. Pump drive shafts shall be measured just prior to assembly to ensure correct alignment without forcing. Equipment shall be secure in position and neat in appearance.
C. Lubricants: The Contractor shall provide the necessary oil and grease for initial operation.
3.3 PROTECTIVE COATING
A. Materials and equipment shall be coated as required in Section 098000 — Protective Coatings.
3.4 FIELD TESTS
A. Where required by the individual pump Sections, each pump system shall be field tested after installation to demonstrate satisfactory operation without excessive noise, vibration, cavitation, or overheating of bearings.
B. The following field testing shall be conducted:
1. Startup, check, and operate the pump system over its entire speed range. Vibration shall be within the amplitude limits recommended by the Hydraulic Institute Standards at a minimum of four pumping conditions defined by the Engineer.
2. Obtain concurrent readings of motor voltage, amperage, pump suction head, and pump discharge head for at least four pumping conditions at each pump rotational speed. Check each power lead to the motor for proper current balance.
3. Determine bearing temperatures by contact type thermometer. A run time of at least 20 minutes shall precede this test, unless insufficient liquid volume is available.
4. Electrical and instrumentation tests shall conform to the requirements of the Sections under which that equipment is indicated.
C. Field testing will be witnessed by the Engineer. The Contractor shall furnish 5 days advance notice of field testing.
D. In the event any pumping system fails to meet the test requirements, it shall be modified and retested as above until it satisfies the requirements.
E. After each pumping system has satisfied the requirements, the Contractor shall certify in writing that it has been satisfactorily tested and that all final adjustments have been made. Certification
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 6
shall include the date of the field tests, a listing of all persons present during the tests, and the test data.
F. The Contractor shall bear all costs of field tests, including related services of the Manufacturer's representative, except for power and water which the Owner will bear. If available, the Owner's operating personnel will provide assistance in field testing.
END OF SECTION 432010
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 7
THIS PAGE INTENTIONALLY BLANK
CITY OF BEAUMONT PUMPS, GENERAL
MESA LIFT STATION UPGRADE 432010 - 8
SECTION 432513 — DRY PIT SCREW CENTRIFUGAL PUMPING UNITS PART 1 — GENERAL
1.01 DESCRIPTION
A. GENERAL: This specification is for the furnishing and installation of dry pit screw -type centrifugal immersible pumps for pumping raw sewage (potentially containing rags and other fibrous material) without clogging.
1. The pumping units shall be manufactured by Hidrostal H5K-S, or equal, as described in this specification and contract drawing no. 83M801. Any proposed substitutions shall be in accordance with the provisions of this specification and shall be approved by the Engineer and the Owner.
2. The Manufacturer/Supplier (through the Contractor) shall provide four (4) identical pumps of the type and model specified. All four (4) units will be installed with one (1) of the units serving as an operational standby.
B. SITE LOCATION: The Owner's existing Mesa Lift Station is located in Beaumont, California.
Refer to Vicinity Map on the cover sheet of contract drawings.
1.02 UNIT RESPONSIBILITY
A. GENERAL:
1. The Pump Manufacturer shall be responsible (through Contractor) for providing the complete pump, including the motor, base and all required pump components for installation by the Contractor.
2. During the submittal process, the Pump Manufacturer shall provide a notarized certificate stating that all equipment and materials for the pump(s) will be provided by the Pump Manufacturer.
3. Pump Manufacturer shall attend pump start-up and provide field services for assistance to the Contractor. Refer to Par. 1.14 of these specifications.
4. Contractor shall be responsible for ensuring that all equipment operates properly and in accordance with the specifications.
5. Contractor shall have overall responsibility for the furnishing, delivery, installation and successful operation of the specified pumping units.
B. COMPATIBLE EQUIPMENT
1. All combinations of manufactured equipment which are approved under this specification shall be entirely compatible and the Contractor and the listed manufacturer shall be responsible for the compatibility and successful operation of the various components of the units conforming to the specified requirements.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-1
2. All necessary mounting, couplings and appurtenances shall be included with each unit.
3. All materials employed in the pump equipment shall be suitable for the intended application and shall be high grade commercial quality, free from all defects and imperfections that might affect the serviceability of the product for the purpose for which it is intended.
4. Pumps shall be fabricated, assembled and operate in full conformance with the drawings, specifications, engineering data and approved shop drawings.
5. The Contractor shall be responsible for furnishing and installing all pumping equipment; and shall also be responsible for furnishing and installing all miscellaneous equipment items required to provide complete, properly functioning pumping units; all in accordance with the Contract Documents.
1.03 PUMP DELIVERY AND CONTRACT COMPLETION SCHEDULE
A. The specified Hidrostal pumping units having screw -type impellers for sewage pumping typically have long fabrication and delivery schedules, in some cases up to thirty (30) weeks after approval of the pump submittals. This pump manufacturing and delivery time has been accounted for in the allocated contract completion time for this project. The Contractor shall be responsible for adjusting his overall construction schedule in order that the pumping units can be manufactured, shop tested, delivered, installed and field tested within the specified Contract Completion Schedule.
1.04 ALTERNATE PUMP MANUFACTURER REQUIREMENTS
A. SUBMISSION REQUIREMENT FOR ALTERNATE MANUFACTURERS
1. The Engineer, on behalf of the Owner, has performed a detailed evaluation of the specified pumping units for this project. Submission of an alternate pump selection and manufacturer (other than alternate manufacturer/model which may be stated herein) shall require that the Contractor provide the Owner with a $6,500 cash deposit and complete submission within ten (10) calendar days following Award of Contract to cover engineering expenses related to the detailed review for an "approved equal" status.
2. Submission of a bid proposal with an alternate pump manufacturer is at the bidder's risk since no detailed review or "equal" status determination of any alternate pump or manufacturer (other than provided for under this specification) will be performed prior to the bid opening.
B. NON -APPROVED PUMP MANUFACTURER:
1. Submission of a non -approved manufacturer may be subject to rejection.
2. Authority for determination of "approved equal" pump and manufacturer, including conformance with Specification requirements, shall rest solely with the Owner.
3. In the event that the Contractor's submission of an alternate pump selection and manufacturer is rejected, Contractor shall submit the specified pump and manufacturer at no additional cost to the Owner.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-2
4. No additional contract time extension will be granted for the Owner's review and evaluation.
1.05 SITE EXISTING CONDITIONS
A. GENERAL: The existing Mesa Lift Station is a 5,000 GPM nominal capacity wet well/dry pit installation currently containing three (3) Flygt pumps with direct mounted motors.
1. Refer to contract drawings for required demolition and reconfiguration.
2. The proposed Hidrostal pumping units shall be oriented and installed to accommodate both the proposed design layout and existing field conditions.
B. MEASUREMENTS:
1. General: Contractor shall be responsible for obtaining and documenting all necessary field measurements prior to submittal of shop drawings. Contractor's field measurements shall be provided with the project shop drawings.
2. Motor Cables: Measure and verify the required length of motor cables for each unit to point of electrical connection since splicing of cables will not be allowed.
1.06 HYDRAULICS AND SYSTEM OPERATION
A. GENERAL: There will be two (2) primary operating scenarios: The interim condition (which is expected to be the scenario upon initial start-up) and some years thereafter; and the ultimate scenario.
B. DESIGN FLOWS: The current peak flow (dry weather) is estimated at 2020 GPM. There is a proposed new development that will increase the peak flow in the near future. A ballpark estimate for near -term design peak flow is 2250 GPM. Ultimate condition design peak flow is 5105 GPM.
C. PUMPING UNITS: The proposed pumping units are equally sized. During the interim condition, two of the four proposed pumping units are expected to operate. For the ultimate condition, three of the four units will operate in combination, with the fourth unit acting as a standby unit, although units may operationally alternate to provide approximate equal use and wear.
D. FORCE MAINS: The existing force main (FM) is 12 -in. diameter PVC; a proposed 16 -in. PVC force main will to be constructed in parallel with the 12" dia. force main. The existing 12 -in. force main is considered under -capacity for near -term peak flow conditions. Therefore, for the interim condition, use 16 -in. dia. FM and isolate the existing 12 -in. dia. force main. In the future, once normal peak flow to the lift station exceeds 3450 GPM, the 12 -in. dia. force main will be placed in parallel with the 16 -in. force main operating in combination.
1.07 QUALITY ASSURANCE
A. PUMP DESIGN AND MANUFACTURING:
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-3
1. All pumping equipment furnished under this Section shall be of a design and manufacture that has been used in similar applications and it shall be demonstrated to the satisfaction of the Owner that the quality is equal to equipment made by that manufacturer specifically named herein.
2. Manufacturer shall provide evidence of at least five (5) installations in which identically sized equipment has provided satisfactory performance for a minimum of five (5) years in a similar application.
3. No consideration will be given to an individually sized pump that has not been commercially available for five (5) years.
B. ISO 9001 COMPLIANCE:
1. To insure a consistent high standard of quality, the manufacturer of this pumping equipment shall comply with the requirements of the ISO 9001 Quality and such compliance shall be verified by an independent certification agency approved by the International Organization for Standardization.
2. Documentation shall be submitted for approval showing compliance with this requirement, and the equipment will not be released for shipment until approved.
C. CONTRACTOR EXPERIENCE: Contractor shall provide evidence of at least five (5) installations in which similarly sized equipment has been successfully installed by its firm and provided satisfactory performance in a similar application.
1.08 SUBMITTALS
A. GENERAL:
1. Prior to commencing pump fabrication or production, Contractor shall submit a digital copy of submittal data for all proposed material and equipment to the Owner for review and approval.
2. Submittals shall include all product data, shop drawings, performance specifications, pump performance curves, submergence requirements, net positive suction head required, etc. for the specific pumping units.
3. The pump submittal data shall be prepared, in its entirety, by the equipment manufacturer. Shop drawings prepared by the manufacturer's sales representative, fabrication shop or other than the listed manufacturer shall not be acceptable.
4. No additions or modifications to the manufacturer's submittal shall be accepted, with the sole exception of a cover letter provided by the manufacturer's local Representative.
B. QUALIFICATIONS: Submit experience qualifications in accordance with paragraph 1.07.A.2.
C. CATALOG DATA: Provide detailed data on pumps, motors and all related appurtenances.
D. PERFORMANCE DATA CURVES: Provide performance data curves showing head, capacity, horsepower demands, pump efficiency, and net positive suction head required over the entire
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-4
operating range of the pump. Indicate separately the head, capacity, horsepower demand and overall efficiency at the guaranteed point.
E. CERTIFIED PUMP CURVES: Provide certified pump curves showing head, capacity, horsepower demands, pump efficiency, and net positive suction head required over the entire operating range of the pump. Indicate separately the head, capacity, horsepower demand and overall efficiency at the guaranteed point. Certified pump curves shall show compliance with the minimum efficiency at the design point indicated in Part 2 of the specification.
F. FIELD DATA AND MEASUREMENTS: For existing lift stations, provide data for all field measurements pertinent to the pumping unit design and installation. Indicate field measurements taken on the shop drawings with an asterisk (*) on the dimension.
G. SHOP DRAWINGS: Provide shop drawings showing plan and section views for the pumping unit showing all pertinent dimensions.
1. Drawings to be to suitable scale.
2. Show all weights; particularly total weight of unit for installation and removal.
3. Show suction stand details.
4. Show suction and discharge piping details.
5. Show base and necessary elevations and dimensions to match existing conditions.
6. Show anchoring requirements and include anchor bolt design and calculations signed by a professional engineer in the State of California.
H. MOTOR:
1. Provide manufacturer's catalog information, motor drawings and operating characteristics, nameplate data and efficiency characteristics, and maximum starts per hour.
2. Wiring diagrams shall be provided showing power and control wiring terminal connections including wiring identification and color coding.
3. Show motor cable lengths to be provided on the shop drawings. Also indicate required length of cables per field measurements.
4. Junction box sizing for power and control wiring connections shall be provided.
5. Information shall indicate compliance with requirements specified in the Electrical Code.
I. FIELD INSTALLATION INSTRUCTIONS: Provide field installation recommendations, instructions and drawings for the entire pumping unit, including bases.
J. OPERATING AND MAINTENANCE MANUALS:
1. Provide three (3) hard copies and one (1) digital copy of the Operating and Maintenance (O&M) Manual.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-5
2. Include maintenance instructions, assembly views, lubrication instructions and replacement parts lists.
3. Recommendations and instructions for initial start-up and testing.
K. FIELD VALIDATION TESTING: Provide a written plan for the pumping unit portion of the system validation testing and operational demonstrations.
1.09 CERTIFICATION OF INSTALLATION
The Contractor shall provide a letter from the Manufacturer/Supplier of the pumping units to the Owner confirming that all pumping equipment was inspected, operation checked and installation approved; together with an executed "Certification of Proper Installation". Contractor shall coordinate with Owner and Pump Manufacturer/Supplier regarding scheduling for installation.
1.10 ACCEPTANCE TESTING
After completion of the pump installation, acceptance testing of the pumping units shall be performed in accordance with Part 3 of these specifications.
1.11 PUMP GUARANTEE
A. GENERAL: The Contractor shall be deemed to guarantee that all materials and workmanship in the items furnished hereunder shall fully meet all requirements of the Contract Documents, including the Technical Specifications.
B. GUARANTEE PROVISIONS:
1. The guarantee shall apply to all units furnished under the contract.
2. Under the guarantee, the Manufacturer/Supplier (through the Contractor's bond) shall be deemed to have agreed to replace all items made necessary by defects in materials or workmanship in the items supplied by him, and that become evident to the Owner within two (2) years after the date of final payment hereunder; and the Contractor shall pay for all work necessary to remove, restore and replace such defective item to full serviceability and to full compliance with the requirements of the Bidding Documents including the Technical Specifications until expiration of said two (2) year period.
3. Any required replacement shall be made promptly upon receipt of written orders for the same from the Owner, and if not made, Owner may secure the service of others to do this work in accordance with the contract provisions.
4. The guarantee and agreements shall be secured by the Contract Performance Bond provided by the Contractor and shall be in accordance with the General Conditions; and the duration of the guarantee shall be two (2) years.
1.12 DELIVERY, STORAGE AND HANDLING
A. GENERAL: The pumping unit Manufacturer/Supplier shall perform the following:
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-6
1. After shop testing and before dismantling pumping equipment for shipment, all wiring and mechanical connections shall be match marked or tagged to ensure proper field assembly.
2. Materials and equipment shall be boxed, crated or otherwise completely enclosed and protected during shipment, handling and storage.
a. Such boxes, crates or protection shall be clearly labeled with manufacturer's name, brand or model designation, and type or grade.
b. Complete packing list and bills for material shall be included with each shipment.
c. Each item of equipment shall be tagged or marked with the same identification number or mark as shown on the packing lists and bills of material.
B. PROTECTION:
1. After delivery and unloading of the pumping unit/equipment by the Contractor, Contractor shall protect materials and equipment from exposure to the elements and keep dry at all times.
2. Handle and store equipment to prevent damage in accordance with Manufacturer/Supplier instructions.
C. SHIPPING AND DELIVERY:
1. Equipment shall be fabricated, shipped and delivered by Manufacturer/Supplier to the project site where unloading and storage will be performed by the Contractor.
2. Installation Contractor shall coordinate all details of delivery with the Manufacturer/Supplier and the Owner.
3. Manufacturer/Supplier shall provide copies of packing lists and bills of lading to the Contractor on or before the equipment is shipped.
D. INSPECTION:
1. Manufacturer/Supplier representative shall be present at time of unloading equipment to ensure that unloading is properly performed, components delivered are complete and components are properly placed in storage.
2. After all equipment has been delivered and prior to installation by the Contractor, Manufacturer/Supplier representative shall perform an inventory inspection of equipment delivered to the project site to confirm that delivery is in fact, complete.
1.13 PRODUCTION SCHEDULE
Within thirty (30) calendar days after date of award of contract, Manufacturer/Supplier (through Contractor) shall furnish Owner with a preliminary pump production schedule. The schedule shall include starting dates and time allocated for engineering, manufacturing, shop testing and shipment. An updated firm
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-7
production schedule shall be provided to the Owner within ten (10) days following final approval of shop drawings and submittals. Any changes in the production schedule thereafter shall be promptly conveyed to the Contractor and Owner through an updated production schedule.
1.14 MANUFACTURER/SUPPLIER SERVICES
A. GENERAL:
1. All costs pertaining to the MINIMUM manufacturer's services as specified herein shall be included in the contract price; and at no additional cost to the Owner.
2. Manufacturer shall designate a qualified Manufacturer's representative who shall be available both by phone and in person to provide technical information relative to the specific equipment being furnished; including installation.
3. The services described herein are for inspection of delivered equipment, observation of field installation, field acceptance testing and in-service checks as described elsewhere in this specification.
4. For purposes of the paragraph, a work day is defined as 8 -hour period at the site, excluding travel time.
5. The Owner may require that the manufacturer's services described herein be furnished in up to eight (8) separate trips to the project site.
B. INSPECTION OF EQUIPMENT DELIVERY: The service representative of the manufacturer shall be present at the site for a minimum of one-half (1/2) working day and perform tasks described in Paragraph 1.12.D.
C. INSTALLATION ASSISTANCE: Assist the Contractor, as required, at the project site during critical installation phases. Inspect installation of all pumping units after they are set in place and provide "Certificate of Proper Installation": Two (2) working days.
D. START-UP AND FIELD ADJUSTMENT: The service representative of the manufacturer shall be present at the project site to assist Contractor with initial start-up and any required field adjustments as necessary to assure that the pumps are in satisfactory operating condition: One (1) working day.
E. ACCEPTANCE TESTING: Attend pumping unit acceptance testing; perform field testing and documentation as required and per Part 3 of these specifications: Three (3) working days.
F. IN-SERVICE CHECK: Between the eleventh and seventeenth month following field testing and acceptance of the pumping units by the Owner, an in-service check shall be performed per Part 3 of these specifications. The service representative of the Contractor and pump Manufacturer/Supplier shall coordinate with the Owner, attend the in-service check, document all check and test results and provide the Owner with a written summary report: One (1) working day.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-8
PART 2 — PRODUCTS
2.01 DESCRIPTION
A. GENERAL:
1. All manufactured pump related items to be provided under this specification shall be new and of current manufacture.
2. All pumping units shall be provided from one manufacturer as specified.
3. All materials for the pumping units shall be suitable for its intended use and service.
4. Materials not specifically called for shall be high grade; free from any defects and imperfection that might offset serviceability of the product for the purpose for which is was intended.
B. SCHEDULE: The pump(s) and pump -related materials specified herein shall be provided for installation by the Contractor compatible with the specified Contract Completion Schedule. Contractor and pump Manufacturer/Supplier shall closely coordinate regarding the schedule.
2.02 PUMP PERFORMANCE AND CONDITIONS OF SERVICE
A. GENERAL:
1. The screw centrifugal pumps shall conform to the applicable Hydraulic Institute (HI) standards.
2. The pumps shall be designed for continuous operation and will be operated continuously under normal service.
3. The pumps shall be compatible with the design system -head curve(s).
4. The hydraulic efficiencies listed for each pump are the minimum acceptable and shall be guaranteed by the manufacturer.
B. OPERATION CRITERIA:
1. Maximum Pump Speed: 1800 RPM
2. Motor Speed: 1798 RPM
3. Maximum Motor Size: 168 HP (VFD Rated)
4. Minimum Shut-off TDH: 384 -feet
5. Maximum Brake Horsepower:
a. 160 HP (within operating range)
b. 140 HP (at Primary Design Point)
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-9
6. Design Condition Points:
a. Primary Design Point: 1750 GPM @ 228 -feet TDH;
Min. Eff = 72.0%
b. Secondary Point 1: 1500 GPM @ 243 -feet TDH;
Min. Eff = 68.7%
c. Secondary Point 2: 2600 GPM @ 183 -feet TDH;
Min. Eff = 74.5%
C. PUMP CRITERIA:
1. Minimum Suction Diameter: 10"
2. Minimum Discharge Diameter: 5"
3. Minimum Non -Compressible Solids Passage: 3.75"
4. Minimum B-10 Bearing Life: 50,000 Hours
D. NPSH REQUIRED: The maximum Net Positive Suction Head (NPSH) required for the full operating range specified in Par. 2.02.B.7 shall not exceed 11.5 -ft.
2.03 PUMPING UNITS
A. DESIGN:
1. The basic design shall be a single -passage, clog -free pump, utilizing a screw -centrifugal impeller. The overall pump design shall combine high efficiency, low required NPSH, a large solid passage, and the ability to handle rags or other fibrous materials without clogging.
2. The hydraulic design of the impeller shall combine the action of a positive displacement screw with the action of a single -vane centrifugal impeller to provide a single, non -bifurcated flow stream with only gradual changes in flow direction.
a. The leading edge of the impeller vane shall blend into the impeller body in such a way that any rag or other fibrous material caught on the leading edge and folded over both sides of the vane will be unfolded and released as the textile follows the flow stream through the pump.
b. The impeller flange or impeller shall contain a spiral groove on the rear face so that any solids in the pumped media are discharged from the space between the back plate and the rear of the impeller.
3. In order to maintain optimum running clearances along the entire length of the impeller to maintain design hydraulic efficiencies, the geometry of the impeller and suction piece shall be conical, so any axial adjustment of the impeller will cause the clearance between the impeller vane and suction piece to change uniformly along the entire length of the impeller. Designs
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-10
incorporating curved, or combination curved/conical impeller and suction piece are not acceptable because in such designs clearances cannot be adjusted uniformly over the full length of the impeller.
4. Suction and discharge flanges shall be drilled to meet ANSI 1251b. bolting.
B. MATERIALS OF CONSTRUCTION:
1. The pump volute, back plate, suction cover, and impeller flange shall be of closed -grained cast iron, ASTM A48-CL30.
2. Suction liner materials of construction:
a. For pumps with a regulable liner, the suction piece shall be externally adjustable to compensate for wear by means of three (3) stainless steel regulating screws so that the necessary running clearances between the liner and impeller can be maintained for optimum hydraulic efficiency. b. Pumps without a separate suction liner are not considered equal or acceptable.
3. Impeller Materials of Construction: For Hidrostal Model H5K-S:
a. Suction Liner: Hardened Liner
b. Wet End Components: Regulable High Chrome Iron Liner c. Impeller Material: High Chrome Iron
d. All impellers shall be dynamically balanced
4. All materials shall conform to the following specifications:
a. Cast Iron: ASTM A48-CL30
b. Ductile Iron: ASTM A536-72
c. High Chrome Iron: ASTM A532-CL.III Type A, minimum 450 Brinell hardness.
d. Impeller stainless steel: Abrasion Resistant Stainless Steel; minimum 16% Chromium, minimum 235 Brinell hardness.
C. IMMERSIBLE MOTOR:
1. Motor Design:
a. Motor to be manufactured by same manufacture as the pump. b. Motors shall be of explosion -proof design, approved by Factory Mutual for uses in Division 1, Class I, Groups C&D, and hazardous locations.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-11
c. The motors shall be of the immersible type, suitable for full -load, continuous operation either completely dry or fully submerged in the pumped liquid of up to 65 -foot depths. Motors shall be of the "air -filled" type, to optimize efficiency, with stator and rotor housed in a watertight chamber containing only air. Motors of the "oil -filled" type, with stator and rotor immersed in oil or motors which circulate the pumped media through internal cooling media channels, ports, or jackets are not equal or acceptable. d. Motors shall incorporate a separate heat -exchanger circuit, with a shaft - mounted cooling pump circulating oil from a jacket surrounding the stator housing to a heat -exchanger surface cast into the pump back plate. The circulating oil shall transfer excess motor heat directly to the pumped media inside the pump volute, without the need of submergence. The circulating oil shall provide adequate motor cooling at any continuous power output up to an including rated powers in an ambient temperature of up to 40°C. e. Motor stator windings and leads shall be Class I-1 wire, insulated with moisture -resistant Class F insulation for operation at temperatures up to 155 degrees Celsius. The complete system shall be considered a Class F insulation system.
f. Motors shall have a stator varnish applied by the "vacuum -pressure impregnation" method to ensure thorough and complete varnish penetration.
The stator shall be heat -shrink into the stator housing. g.
Motor cable -entry sealing assembly shall consist of the following components to ensure a positive, redundantly watertight seal:
i. The sealing components shall be mechanically isolated from cable strains by a two-piece restraining clamp, which will securely grip the cable above the moisture -sealing components and bear any mechanical forces applied to the cable.
ii. The cable moisture seal shall consist of an elastomer grommet, prevented from extruding past the cable by stainless -steel retaining washers on either side. The grommet shall be compressed tightly against the cable outside diameter (and the entry assembly inner diameter) by a screwed follower gland.
iii. Each individual conductor shall be interrupted by a solid -copper isolation dam to prevent wicking of moisture through the conductor stands. iv. The cable insulation shall be sealed by an epoxy poured into the cable entry and totally encapsulating the stripped -back insulation and the individual copper dams. This poured epoxy seal shall also function as a redundant seal for the cable outside diameter.
v. The cable free end shall be sealed from moisture -entry during shipping, storage, and prior to connection to the control panel by a plastic sleeve securely clamped over the cable end.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-12
vi. Motors which use only a compressed grommet gland, or only a poured epoxy seal, without benefit of redundancy of both types together are not considered equal or acceptable.
h. Shaft sealing shall be independently -mounted, tandem mechanical seals contained in an oil chamber that is formed as an intrinsic part of the motor frame and allows the seals to be completely submerged in and lubricated by the oil bath.
i. The mechanical seal nearest the bearing shall utilize carbon/silicon carbide faces and shall isolate the seal cooling oil from the motor frame. ii. The mechanical seal nearest the impeller shall be a rubber bellows -type construction (except for U and T size motors, which shall be stainless steel bellows -type construction) with the bellows designed to prevent contaminants from contacting the stainless -steel spring which loads the seal face. The seal faces shall be a solid tungsten carbide rotating face running against a solid silicon carbide stationary face. Seals with both faces of similar materials, or seals with bonded, soldered, or converted face surfaces are not equal or acceptable.
iii. The mechanical seal nearest the impeller shall be contained in a seal chamber formed by the impeller flange and a recess cast into the motor frame. To prevent debris from entering the chamber and to prolong the mechanical seal life, a flush port shall be provided so that an optional external water flush can be supplied directly into the seal chamber. 4) The mechanical seal nearest the impeller shall be isolated from contaminants in the pumped media by a labyrinth -fit between the backside of the impeller back shroud and into the back plate, to minimize debris reaching the shaft seal. i. The thrust bearings shall be designed to take the full axial load of the impeller.
J.
Motors shall be immersible, 3 phase, 60 cycle, 168 HP, 1798 RPM.
2. Motor Protection Devices:
a. Motor size (third digit of motor code): U, T
b. Thermal Protection: Thermostats (N/C Klixon type); or thermistors c. Bearing Temperature Protection: Normally closed thermal switch d. Dry Chamber Float Switch: Normally closed float switch
3. Protection Device Specifications:
a. Thermostats (N/C Klixon type): Three normally closed thermal sensors embedded in the stator windings, wired in series, will open a protective circuit if winding temperature exceeds rated operating temperature. These sensors automatically
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-13
reset when winding temperature has cooled to a safe operating temperature.
Thermostats shall not be used on VFD operation.
b. Thermistors: Three thermistor type thermal sensors embedded in the stator windings, wired in parallel, will send a signal to an external relay, which will open a protective circuit if winding temperature exceeds rated operating temperature.
Upon tripping, the external relay must manually reset and the cause of the overheating investigated before the motor can be returned to operation. When the motor is operated on VFD, thermistor type thermal protection must be used. c. For Motors Equipped with Bearing Temperature Protection: One normally closed thermal sensor is provided in close contact to the thrust bearings of the motor. The sensor will be wired to shut down the motor if bearing temperature exceeds rated operating temperature.
d. For Motors Equipped with a Dry Chamber Float Switch: The motor shall be equipped with a normally closed float switch in the dry portion of the motor, to shut down the motor in the event that water should enter the dry portion of the motor.
e. Pump Manufacturer shall provide to the Electrical Contractor a four channel intrinsically safe relay module such as the RK Electronics IS -R series for the connection of the oil conductivity sensor, bearing temperature sensor, and the dry chamber float switch. In addition, the Pump Manufacturer shall provide a thermistor motor protection relay such as the Siemens Sirius 3RN2 series.
4. Conductivity Probe: All motors shall be fitted with a conductivity probe to monitor the moisture content of the oil in the chamber between the outer and the inner mechanical seals. The probe shall be wired to a separate protective circuit, which, when connected to a conductivity -sensitive relays in the control panel, will trip an alarm if moisture content of the oil indicates a failure of the outer mechanical seal.
D. DRY PIT IMMERSIBLE MOUNTING: for Hidrostal Model H5K-S:
1. Mounting Option: Concrete Piers
2. Base Material: Painted Steel Soleplate
3. Elbow or Suction Stand Material: Cast Iron Suction Stand
4. Vertical Pier Mounting with Suction Elbow: The pump manufacturer shall provide a fabricated steel soleplate of sufficient thickness to support the entire weight of the pump and motor. a. The pump manufacturer shall provide the Contractor with drawings and data so that the Contractor can provide two formed concrete piers to properly support the soleplate and pump assembly, while providing sufficient clearance to ensure that the suction does not in contact with the floor.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-14
b. The concrete pump piers shall be formed such that there is no impedance to access the pump piping connections or inspection covers.
c. The pump shall be supplied complete with a cast iron suction elbow which shall be fitted within the confines of the concrete piers.
d. The cast elbow shall include an integral hand -hole cleanout, the interior surface of which shall follow the contours of the suction elbow.
E. PUMP COATING: Pump coating shall be Tnemec N69 Hi -Build Epoxoline II or Owner approved equal; minimum two (2) coats, 5.0 mils DFT each (10 mils DFT total).
F. NAMEPLATES
1. Each pump shall have a Type 316 stainless steel plate permanently attached by stainless steel screws or rivets to the pump frame into which the following information shall be impressed, engraved or embossed:
a. Manufacturer's name
b. Pump size
c. Serial number
d. Impeller diameter
e. Capacity
f. Head rating
g. Speed
h. Bearing numbers
2. Nameplates shall include information unique to each item of equipment and device to identify its function as described herein.
3. Function nameplates shall be approximately 1 -inch by 3 -inches if made separately.
4. Letters of function titles shall not be smaller than 1/4 -inch high.
G. SPARE PARTS: Provide one (1) set each of the following spare parts:
1. Impeller
2. Liner
3. Associated O -rings
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-15
H. PUMP, MODEL AND MANUFACTURER: Pumping shall be Model H5K-S submersible/Immersible units as manufactured by Hidrostal.
PART 3 — EXECUTION
3.01 PUMP EQUIPMENT FACTORY TESTING
A. GENERAL: All pumps shall be factory -tested in accordance with these specifications.
Certified test results shall be submitted to the Owner for approval prior to shipment.
B. ASSEMBLED UNITS: Tests shall be performed on the actual assembled unit over the entire operating range on the certified performance curve. Prototype model tests will not be acceptable.
C. CERTIFIED PUMP CURVES: Certified pump curves shall reflect data secured during actual test runs and shall be signed by a responsible representative of the pump manufacturer. Test reports and procedures shall conform to applicable requirements of the Hydraulic Institute Standards.
D. ACCEPTANCE GRADES: Grade 1B per ANSI/HI 14.6
3.02 INSTALLATION
A. GENERAL:
1. Pumping equipment and related appurtenances shall be installed in accordance with the approved instructions, procedures and shop drawings submitted by the pump manufacturer/supplier and as indicated on the Contract Drawings.
2. Manufacturer/Supplier shall provide the following as summarized below and detailed in Part 1:
a. Inspection of pumping unit equipment upon delivery to project site. b. The necessary installation recommendations, guidelines and drawings to Owner and Contractor.
c. The required Manufacturer services during construction. d. "Certification of Proper Installation" confirming that all pumping equipment was installed, inspected, checked, adjusted and tested in accordance with the manufacturer's recommendations and requirements specified herein.
3. The pump manufacturer shall furnish the services of factory -trained personnel as required to examine the installation, supervise start-up of equipment installed, and repair the equipment at no additional expense to the Owner.
B. ALIGNMENT AND SETTING: Equipment shall be field checked to verify proper alignment and setting, and operation as specified. Equipment shall be secured in position and fixed neatly in appearance.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-16
C. FOUNDATIONS: The Contractor shall furnish and install the reinforced concrete pier supports and all necessary embedment items, anchor bolts, nuts, washers, anchor tie rods, other material necessary for anchoring the equipment to the reinforced concrete pier supports.
D. PIPING AND APPURTENANCES: Furnish and install piping and appurtenances associated with the pumping equipment in accordance with other sections of the Technical Specifications and Contract Drawings.
E. COORDINATION: Contractor shall be responsible for coordinating all applicable aspects of the project with the pump manufacturer/supplier including, but not limited to equipment installation procedures and requirements, specific materials to be furnished, scheduling of materials deliveries, overall construction schedule, equipment storage and protection requirements, and equipment testing requirements.
3.03 FIELD TEST TESTING
A. GENERAL: Field testing shall be performed, as approved by Engineer, to verify performance of all installed equipment. The manufacturer's Field Service Engineer shall assist in the proper conduct of pumping unit field tests.
1. The pump units shall perform in the field as shown on the certified pump curves furnished by the Contractor.
2. Tests shall also demonstrate operation without cavitation, vibration, overheating of moving parts, and excessive noise.
B. FIELD TEST AND ADJUSTMENTS:
1. The Contractor and the Manufacturer's Field Service Engineer shall conduct proper pumping unit field acceptance tests.
2. Tests shall demonstrate operation of the pumping units without cavitation, vibration and excessive noise.
3. Make necessary corrections to achieve smooth pump operation for all units.
3.04 SYSTEM VALIDATION TESTING
A. GENERAL: Manufacturer/Supplier shall assist the Contractor in performing operational demonstration and system validation testing for the specified sewage pumping units.
B. SCHEDULE: Operational demonstrations and validation testing shall not commence for any equipment item or system until all related structures, piping, electrical, instrumentation, control and like work has been installed, tested, and connected in compliance with the pertaining requirements specified elsewhere in the Specifications.
C. PUMPING UNIT FIELD TEST SCOPE: Each pumping unit shall be tested in automatic mode for not less than 48 -hours, with no interruptions.
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-17
1. Pump discharge valves shall be throttled to simulate design condition(s).
2. Flow may be measured via pitot tube or by use of Owner's mag meter.
3. Contractor to provide calibrated test pressure gauges.
4. Record pumping unit flow, discharge pressure, motor voltage and motor amperage at least four (4) separate times at 6 -hour minimum intervals during test period. a. Maintain neat and accurate records of test data and results. b. Provide copy of data and results to Owner together with a summary report.
D. INSPECTION AND SUPERVISION: Contractor and Pump Manufacturer/Supplier shall jointly perform operational demonstrations and system validation testing under continuous inspection by the Owner. Technical representative(s) of the equipment manufacturer shall be present at the start of the operational demonstrations, will examine their equipment at least twice near the beginning and end of the validation tests, and will supervise the start- up and adjustment procedures.
E. CORRECTIONS OF DEFECTS: Immediately correct all pump installation related defects and malfunctions disclosed by demonstrations and validation tests using approved methods and new materials for repairs as required.
3.05 IN-SERVICE CHECK
A. GENERAL:
1. As part of the work, an in-service check of the pumping units is required to be validation tested. Refer to Par. 1.14.F.
2. Manufacturer/Supplier (through Contractor) shall provide all necessary equipment to conduct the validation testing as per Paragraph 3.04.C.
B. IN-SERVICE CHECK REQUIREMENTS:
1. Checks shall be detailed and complete and shall be performed under the observation and to the satisfaction of the Owner.
2. Provide documentation of results and summary report as per Par. 3.04.0 within 10 - days following the in-service check.
3. All costs for the in-service check shall be included in the contract price.
END OF SECTION 432513
CITY OF BEAUMONT DRY -PIT SCREW CENTRIFUGAL PUMPING UNITS MESA LIFT STATION UPGRADE 432513-18
SECTION 461500 — ALUMINUM BASIN COVERS (ADD ALTERNATE)
PART 1 - GENERAL
1.1 SUMMARY
A. This specification is for a fully engineered, substantially airtight, aluminum cover structure comprised of panels, and beams.
1.2 SCOPE OF WORK
A. Furnish all labor, materials, and equipment to provide a complete, installed system of fixed and removable, custom fit, flat aluminum covers. The Tank Cover system includes cover panels, structural supports, and attaching hardware.
B. The following shall be covered with an aluminum cover as outlined in this specification:
1. Emergency Storage Basin — Dimensions as shown in plans The covers shall free span the entire clarifier and shall not require any internal supports.
1.3 MANUFACTURERS
A. Basis -of -Design Product: Subject to compliance with requirements, provide aluminum basin covers as manufactured by:
1. Hallsten Corporation (Basis -of -Design)
2. CST Industries
3. Or equal
1.4 ENGINEERING
A. A submittal shall be provided to the engineer prior to the beginning of fabrication. The submittal shall include:
1. Complete structural calculations showing the governing stresses in all members, connections, anchoring to concrete walls, and detailed shop drawings. Preliminary drawings shall be stamped by the cover manufacturer's Professional Engineer. Final Drawings and calculations shall bear the stamp of State of California Professional Civil Engineer.
2. Manufacturer's standard guarantee.
3. A letter of certification signed and sealed by a registered Professional Civil Engineer in the State of California confirming that the aluminum cover is in full compliance with the plans and specifications including any testing provisions included therein.
CITY OF BEAUMONT ALUMINUM BASIN COVERS
MESA LIFT STATION UPGRADE 461500-1
1.5 QUALIFICATIONS
A. Manufacturer: Shall be a company specialized in providing engineered aluminum covers for wastewater treatment tanks/troughs for at least ten (10) years. When requested by the Engineer, submit written evidence to show experience qualifications and adequacy of plant capability and facilities for performance of contract requirements.
B. Erector: Regularly engaged for at least ten (10) years in the erection of aluminum covers for wastewater treatment tanks.
C. Welders: Qualified within the past two (2) years in accordance with AWS.
1.6 PERFORMANCE
A. Span: The clear span length of the cover shall be as noted in drawings.
B. Width: The inside width of the cover shall be as noted in drawings.
C. Distributed Design Live Load and Deflection: All structural components shall be designed to support the dead weight of the structure, plus a live load of 50 pounds per square foot of surface.
The maximum deflection of any component under this load shall not exceed L/240 of the span of that component. In no event shall the dead load deflection exceed the rise of any component in order to avoid surface ponding.
D. Concentrated Live Load: The structural components shall be designed to support a 400 -pound load on a 6" X 6" area located anywhere on the surface of the structure without permanently deforming the tested area.
E. Design Stresses: All allowable design stresses in structural aluminum shall be in accordance with the "Specifications for Aluminum Structures" for building -type structures by the Aluminum Association.
F. Skid Resistance: The cover shall possess an integral non-skid surface and no exposed area of cover system wider than one inch shall be without ribs/non-skid surface. The aluminum -decking surface of the structure shall be Hallsten's Deck Slat, which is ribbed to provide an aggressively non-skid surface. The edges of adjacent deck slats shall double interlock so that the slats shall act together. The decking surface shall be manufactured form 6061-T6 alloy. The Manufacturer of the non-skid surface shall demonstrate in writing satisfactory performance for a minimum period of 10 years in the wastewater industry for the intended purpose. This surface shall not be achieved by the use of paint, adhesive tapes, sand blasting or any other means other than an extruded process.
G. Chemical Resistance: Panels shall be fabricated entirely of 6061-T6 corrosion resistant aluminum extrusions. Every panel to beam connection shall be chemical resistant and will not weaken or corrode and will interlock. A mechanical and replaceable Santoprene seal shall isolate the cover perimeter from the concrete wall. No foam tape or caulk shall be allowed.
H. Configuration: The aluminum cover shall be composed of panels and beams. All panels shall interlock with the adjoining beam and panels without the use of threaded fasteners. Uplift of each panel will be resisted with the use of an integral latch system. The weight of an individual panel
CITY OF BEAUMONT ALUMINUM BASIN COVERS
MESA LIFT STATION UPGRADE 461500-2
shall not exceed 150 pounds. Each removable panel shall be easy to remove without disruption of adjacent panels and the lifting force required shall not exceed the dead weight of the panel.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Aluminum: All aluminum used in the fabrication of the cover shall be alloy 6061-T6. All plate shall be alloy 6061-T6. Material shall be new and of top quality.
B. Welding Electrodes: Welding shall be with electrodes of an alloy, which shall produce welds with strength and corrosion resistant characteristics compatible to the base metal.
C. Fasteners: All fasteners between aluminum components shall be stainless steel or structural plastic. Aluminum shall be isolated from dissimilar materials by means of a stainless steel spacer or an elastomeric isolator. Beams and panels shall be fastened to concrete using stainless steel drill in place anchor bolts.
D. Steel Accessories: No carbon steel components shall be used.
E. Seals: A mechanical and replaceable Santoprene seal shall isolate the cover perimeter from dissimilar materials such as concrete and steel. No foam tape or caulk shall be allowed for isolation of cover system.
F. Access Hatch Panels: Access to any location under the cover shall be gained through integral gear hinged access hatches. The Access Hatch Panels shall have the identical properties as the rest of the aluminum cover including loads, deflection and slip resistance specifications. The access - hinged panels shall be the full panel width. The length of the access panel shall be clearly indicated on drawings. Hinged panel components including hinges, decking and lifting handles shall be extruded 6061-T6. While in the closed position the hatches will be completely flush therefore posing no tripping hazard. In the open position the panel shall lie flat on the cover and will not need a hold open device.
G. Handles: Handles shall be an integral flush mounted aluminum and incorporated into the non-skid deck slat.
2.2 FABRICATION AND WORKMANSHIP
A. Workmanship: The quality of workmanship shall be equal to the best general practice in modern structural fabrication shops. Workmanship, fabrication, and shop connections shall be in accordance with the latest edition of ANSI/AWS D1.2 "Structural Welding Code - Aluminum".
B. Experience: The manufacturer must furnish adequate evidence of a minimum of ten (10) years of ongoing experience in the manufacture of similar structures.
CITY OF BEAUMONT ALUMINUM BASIN COVERS
MESA LIFT STATION UPGRADE 461500-3
C. Preparation for Welding: All components to be welded shall be free of dirt, grease, and other contaminants and shall fit up properly for sound welding. Surfaces to be welded may not be cut with oxygen. Sawing, shearing, or machining may be used.
D. Welding Procedures: All welding shall be with an inert gas shield arc process. Machine settings shall be developed with test welds of the same material, alloy and geometry as the work pieces and samples will be tested destructively.
PART 3 - EXECUTION
3.1 TESTING
A. Loads: After installation the cover structure will be tested for conformance with the deflection limits. A load of 400 pounds will be placed as directed by the Engineer and the maximum deflection created by the load will be measured.
B. Prequalified Shop Testing: MANUFACTURER shall perform a prequalified shop air tightness test and certification for the cover components proposed. This test shall be performed in accordance with the "Procedural Standards for Testing, Adjusting and Balancing of Environment System" as published by the National Environmental Balancing Bureau (NEBB) on cover components of not less than 80 square feet. Said test shall be conducted and witnessed by a NEBB certified technician. The method of testing, test apparatus and proposed contents of the test report shall be submitted to the Engineer for approval. Subsequent to the receipt of Engineer's approval, the Manufacturer shall set up testing protocol and schedule the test. A report of the test shall be prepared by the certified technician and shall be sealed with the NEBB seal. The report shall include a description and illustration of the test components, a description and illustration of the test apparatus and a report of the results. The cover shall maintain an air intrusion leakage rate not to exceed 0.2 cfm per square foot at an applied negative pressure of 0.2 inches of water column for a five-minute duration.
3.2 DELIVERY AND INSTALLATION
A. Delivery: Delivery of the components of the structure shall be made to a location nearest the site that is accessible to over the road trucks, unless otherwise specified.
B. Storage: The manufacturer shall be responsible for jobsite storage of the delivered components.
The components shall be stored off the ground on level surface in such a manner as to prevent damage.
C. Installation: The manufacturer shall furnish such personnel, tools, equipment, and materials as required to install the cover using the recommended procedure. The manufacturer shall also provide a written certification to the Engineer that the cover has been installed according to the manufacturer's requirements.
D. Contractor Installation: The cover manufacturer can provide installation instructions, on site supervision, and inspection if desired. The manufacturer shall also provide a written certification to the Engineer that the cover has been installed according to the manufacturer's requirements.
END SECTION 461500
CITY OF BEAUMONT ALUMINUM BASIN COVERS
MESA LIFT STATION UPGRADE 461500-4
SECTION 462433 — MANHOLE GRINDER SYSTEM
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes Grinder Manhole, Installation Frame & Lifting Guides, and Controller.
1.2 REFERENCE STANDARDS
A. Equipment shall, as applicable, meet the requirements of the following industry standards.
B. ASTM International (ASTM):
1. ASTM A36 - Carbon Steel Plate.
2. ASTM A536 - Ductile Iron Castings.
3. ASTM A48 - Gray Iron Castings.
4. ASTM A564 Grade 630 condition H1150 (17-4) stainless steel C. American Iron and Steel Institute (AISI):
1. AISI Type 1020 Steel
2. AISI Type 1045 Steel.
3. AISI Type 4130 - Heat Treated Alloy Steel.
4. AISI Type 4140 Heat Treated Alloy Steel.
5. AISI Type 18-8 Stainless Steel
6. AISI Type 303 Stainless Steel.
7. AISI Type 304 and 304L Stainless Steel.
8. AISI Type 316 and 316L Stainless Steel.
D. Society of Automotive Engineers (SAE):
1. SAE Type 660 Bearing Bronze.
E. National Electrical Manufacturer's Association (NEMA) Standards.
F. National Electrical Code (NEC).
G. Underwriters Laboratory (UL and cUL).
H. International Electrotechnical Commission (IEC).
1.3 QUALITY ASSURANCE
A. Qualifications:
1. Manufacturer is documented as being engaged in the sale of similar products for over forty -years.
2. Manufacturer is single supplier for equipment listed in this section.
3. Manufacturer's Service Center is located domestically for repairs and upgrades.
4. Manufacturer supports Renew Program, providing new factory -built replacements of selected products for install without requirement to return existing equipment.
5. Manufacturer supports Preventative Maintenance Program, providing inspection and
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-1
service of equipment by Manufacturer's Factory Technicians.
6. Manufacturer stocks all non -custom spare Parts.
B. Regulatory Requirements:
1. Manufacturer is U.L. listed for the construction of controller.
C. Certifications:
1. Manufacturer's management system is ISO9001 certified.
1.4 SUBMITTALS
Submittal documentation is provided for approval in ".pdf' format.
A. Product Data:
1. Product description text.
2. Performance curves or capacity tables.
3. Catalog data.
B. Shop Drawings
1. General arrangement of installation.
2. Product Configuration.
3. Assembly
4. Wiring diagrams
C. Operation and Maintenance Manuals:
Submit one copy of a suitable operation and maintenance manual with shipment of product. An electronic version shall be supplied to create additional copies.
1. The manuals shall include but not be limited to the following: Equipment descriptions, operating instructions, drawings, troubleshooting techniques, recommended maintenance schedule, recommended lubricants, and recommended replacement parts list.
D. Anchoring Design:
1. Submit anchoring calculations and design stamped by a professional engineer licensed in the state of California.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Packaging, Shipping, Handling, and Unloading
1. Packaged in containers or on skids suitable for normal shipping, handling, and storage.
2. Protected from rain, snow, impact, and abrasion while in the possession of the carrier.
B. Acceptance at Site
1. Contractor shall review the contents of the shipment at time of delivery and promptly notify the carrier and supplier of any discrepancies.
C. Storage and Protection
1. Equipment to remain in the packaging provided by the supplier until it is installed.
2. Equipment to be stored in a dry environment between 40 and 100 degrees F.
D. Waste Management and Disposal
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-2
1. Contractor shall be responsible for discarding all packaging materials in an environmentally friendly manner and in accordance with local regulations.
1.6 WARRANTY
A. 12 -month Limited Warranty
1. Manufacturer submits a standard twelve-month limited warranty document clearly identifying the scope, term, and exclusions from the coverage.
1.7 SERVICE
A. Supplier supports product with multiple programs options available.
1. Service Center located domestically for repairs and upgrades.
2. Renew Program: Provides new factory -built replacements of selected products for install without requirement to return existing products.
3. Preventative Maintenance Program: Inspection and service of equipment by Factory Technicians.
4. Spare Parts.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. JWC Environmental Inc,
B. Or Approved equal
2.2 GRINDER MANHOLE
Fiberglass reinforced polyester (FRP) below ground manhole connects into pipeline ahead of pump location and allows installation of an open -channel grinder for solids reduction. Provides above ground access to the grinder.
A. Basis of Design:
1. Muffin Monster Manhole (as manufactured and supplied by JWC Environmental Inc a. 72 -inch barrel diameter with %2 minimum wall thickness able to withstand static load of 150 lb -ft per foot of depth with less than'/4-inch deflection. b. Interior surface smooth isophthalic gelcoat integral to the laminate not applied as spray or secondary process.
c. Interior surfaces white for easy inspection for toxic molds and mildew. d. Supplied with 1/2 -inch thick expanded polystyrene bead board for placement on concreate slab under manhole.
e. 2 -inch NPT FRP conduit tap for electrical cables.
f. Equipped with four (4) AISI 316 stainless steel mounting brackets B. Inlet and Outlet Connections
1. Neoprene boot and stainless steel bands for connection to influent and effluent pipe.
2. Pipe size: 30 -inch (RCP)
C. Manway-Traffic
1. Concentric dome able to withstand 16,000 lb vertical dynamic wheel load plus lateral
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-3
forces.
2. Provides 60 -inch diameter access.
3. For use with cast iron manhole cover (Provided by others) D. Integral open -channel
1. Width sized to accommodate grinder and required hydraulics.
2. Depth sized to accommodate grinder and required hydraulics.
3. Provides 4 -inch deep recess for grinder for improved hydraulic performance.
E. Fiberglass Ladder
1. Meets or exceeds OSHA General Industry Standards, Part 1910.27 for "Fixed Ladders".
2. Non -slip traction surface.
2.3 OPEN -CHANNEL GRINDER
Reduces solids conveyed in a wastewater stream to a size that is non -detrimental to downstream equipment. Grinder uses side rail with flow channel and specially designed fingers with a shape to create a pressure gradient increasing flow capacity and maximize capture of solids. Grinder uses low speed and high torque drive with two counter -rotating shafts stacked with intermeshed individual cutters and spacers supported on both ends of each shaft with mechanical seal and bearing cartridges, driven by an electric motor and speed reducer. Grinder will be subject to infrequent submerged conditions.
A. Basis of Design:
1. Channel Monster Flex model# CMF3624 (Wipes -Ready) as manufactured and supplied by JWC Environmental Inc
a. Maximum Design Flow Capacity: 9,065 GPM (13.05 MGD)
b. Cutter Stack and Perforated Drum Height: 36 inches
c. Perforated Drum Diameter: 24 inches
d. Cutter Stack Configuration: Multi Zone -Staggered and Helical 1) Zone 1 (Grit) Stack Height: Nominal 6 -inches
2) Zone 2 (Working) Stack Height: Nominal 30 -inches
B. Cutter Assembly
1. Stack Configuration: Multi -Zone -Staggered and Helical Stack a. Cutters and spacers stacked with two defined zones, each with its own unique cutter and spacer type, thickness, stacking configuration, and material throughout zone. Zone 1 cutters for high abrasion resistance and Zone 2 cutter for shearing and particle size control.
Zone 1 -Grit Zone
2. Material Zone 1: Alloy Steel.
a. Cutters: Through hardened to 45-52 HRC
b. Spacers: Through hardened to 34-52 HRC.
3. Cutters -Zone 1 (6 -inch Grit Zone) -Staggered Stack a. 7 -tooth Cam style, .438 -inch effective thickness, 4.710 -inch diameter. Designed specifically for waste streams containing heavy volumes of solids. b. Precision ground individual cutter elements with a thickness tolerance of +.000/ - .001.
c. Keyed to shaft with hexagon opening.
Spacers -Zone 1 (6 -inch Grit Zone)
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-4
d. Smooth 0.D. .446 -inch thick, Alloy Steel.
e. Precision ground individual spacer elements with a thickness tolerance of +.001/ - .000.
f. Keyed to shaft with hexagon opening.
Configuration -Zone 1 (Grit Zone)
g. Cutters and spacers form 3 -inch nominal stack height h. Cutters stacked staggered with every other cutter's teeth aligned to minimize absorbed torque requirement and maximize cutter tooth force.
Zone 2 -Working Zone
4. Material Zone 2: Alloy Steel.
a. Cutters: Through hardened to 45-52 HRC
b. Spacers: Through hardened to 34-52 HRC.
5. Cutters -Zone 2 (Working Zone) -Helical Stack
a. 17 -tooth Serrated Cam style, .438 -inch thick, 4.730 -inch diameter. Designed specifically for waste streams requiring focused reduction of disposable and non - disposable cloth products or wipes.
b. Multiple serrations located on outside diameter edge of cutter teeth create punctures or perforations in the cloth or paper materials creating a confetti type cut that inhibits reweaving of the material with hair and other solids. c. Precision ground individual cutter elements with thickness tolerance of +.000/ - .001
d. Keyed to shaft with hexagon inner profile.
Spacers -Zone 2 (Working Zone)
e. Knurled 0.D. .446 -inch thick.
f. Knurled diamond pattern on outside diameters surface. g. Precision ground individual spacer elements with a thickness tolerance of +.001/ - .000.
h. Keyed to shaft with hexagon opening.
A. Intermediate Shaft Collar with Vertical Support
1. Intermediate shaft collars, AISI 304 stainless steel housing, SAE 660 bearing bronze bushing and 17-4 PH rotating element.
2. Vertical Support with adjustable brackets for mounting of the shaft collars.
3. Vertical Support, AISI 304 stainless steel.
4. AISI 304 stainless steel grease fittings and grease lines attached to shaft collars and routed through Vertical Support.
5. Bushing and rotating element factory lubricated with high temperature marine grade grease.
B. Mechanical Seal and Bearing Cartridges -Severe Duty
1. Seals and bearing incorporated into a cartridge style design requiring no external seal flush or lubricants to operate wet or dry.
2. Rated for maximum operating depth: 346 feet (150 psi).
3. Secondary lip seal with grease barrier.
4. Dynamic and Static seal faces to be Tungsten carbide with 6% nickel binder.
5. Cartridge bushing and housing are AISI 304 stainless steel.
6. O -rings to be Viton (Fluorocarbon).
C. Shafts
1. 2 -inch hexagon heat treated AISI 4140 alloy steel.
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-5
2. Minimum tensile strength of 170,000 psi.
3. Supported on either end by Mechanical Seal and Bearing Cartridges.
4. Cantilevered designs are not acceptable.
D. Compression Nut and Spring Disk
1. Compression Nut
a. Stack nut sized to provide proper clamping force to secure cutting stack at manufacturer's recommended torque.
2. Spring Disk
a. Spring element provides a preload of the cutter stack maintaining a clamping force securing the cutter from movement.
b —Disk, or seat element prevents overloading of cutter stack by limiting distance spring element can be compressed.
E. End Housings, Side Rails, Top Cover, Bottom Cover, and Gaskets
1. End Housings
a. Cast integral bushing deflector directs solids away from Mechanical Seal and Bearing Cartridge bushings.
b. Directional flow arrows on side of housings indicate correct installation orientation for solids discharge.
c. Cast ASTM A536-84 65-45-12 ductile iron.
2. Side Rails
a. Evenly -spaced horizontal fingers and flow channels. Flows channel create additional open area through grinder increasing flow capacity. Horizontal fingers direct solids toward cutters by creating a pressure differential towards the cutters. b. Shape of flow fingers creates a pressure gradient to force solids to cutters and minimize water head loss.
c. Fingers and flow channel are positioned on the upstream side of the grinder terminating even with the center of the cutter proving free discharge. d. Side rails with flow channel running the entire length of the side rail are not allowed.
e. Cast ASTM A536-84 65-45-12 ductile iron.
3. Screen Side Rail
a. Opening allows Solids Diverter perforated drum to be positioned close to cutter's tooth tip.
b. Cast ASTM A536 65-45-12 ductile iron.
4. Top Cover:
a. Manufacturing identification plate mounting.
b. Cast ASTM A536-84 65-45-12 ductile iron.
5. Bottom Cover:
a. ASTM A36 Steel.
6. Gaskets:
a. Cork and neoprene rubber.
F. Transfer Gears with integral interlocking lobes
1. Heat treated and hardened AISI 4140 alloy steel.
2. Number of teeth on gears creates ratio of cutter tip speed on low speed shaft to cutter tip speed of highspeed shaft greater than 0.90 and less than 1.00 to promote cleanout of processed material in cutting stack.
G. Couplings
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-6
1. Low Speed Coupling
a. Two-piece 3 -jaw interlocking design.
b. Hardened AISI 4140 alloy steel
2. High Speed Coupling
a. Type L 3 -jaw with elastomer
b. Buna-N spider.
H. Lifting Eyes
1. Drop forged Steel
2. Rated for 13001b
3. Designed for lift of grinder.
I. Speed Reducer
1. Grease lubricated cycloidal design Cyclo Series 6000 with 29:1 reduction ratio.
2. Manufacturer: Sumitomo Machinery Corporation of America.
J. Motor
1. XPNV Immersible Explosion Proof Motor: Baldor Electric Company. a. Installed Horsepower: 5 HP.
b. Motor Service Factor: 1.15.
c. Minimum Motor Efficiency (at Full Load): 91 percent. d. Minimum Motor Power Factor (at Full Load): 76.
Performance:
e. Grinder Peak Torque with Reducer: 1,665 lb -ft.
f. Grinder Peak Force at Cutter Tip: 8,493 lbf.
g. UL rated NEMA 6P, Class I, Div. 1 Groups C&D, Class II Div. 2, Groups F&G, Class III Div. 1.
h. Manufacturer rating of 40 consecutive days of submergence at a maximum depth of 40 feet.
i. Capable of operating in air 100 percent of time with no external cooling required. j. No fan cooling during operation.
k. Utilize ceramic shaft seal requiring no oil lubrication.
K. Identification:
1. Corrosion resistant nameplate affixed to top cover of Grinder.
2. Nameplate Information: Manufacturer's name and address, Model No., Serial No., Capacity, Max. psi, Weight, Manuf. Date.
L. Finishes:
1. Paint Coatings for Ferrous Materials: Prepared to SSPC-SP6 (Commercial Blast Cleaning) and coated with minimum 6 to 8 mils TDFT (total dry film thickness) of an aliphatic acrylic polyurethane paint in the color Hunter Green.
2. Paint Coatings for Previously Coated Components (Motors, Speed Reducers, etc.):
Prepared to SSPC-SP1 (Solvent Cleaning) and SSPC-SP2 (Hand Tool Cleaning) and coated with minimum 6-8 mils TDFT (total dry film thickness) of an aliphatic acrylic polyurethane paint in the color Hunter Green.
2.4 SOLIDS DIVERTER
Cylindrically formed stainless steel perforated screen drum mounted vertically between two housings containing mechanical seals and bearing cartridges, driven by an electric motor and
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-7
speed reducer. Solids captured on the surface of the rotating screen drum are conveyed to the cutters of the Grinder. Low RPM of screen drum allows cutters of Grinder multiple tooth passes to remove and reduce solid. Vertical brush sweeps perforations of screen drum keeping orifices free from buildup.
A. Perforated Screen Drum
1. Screen cylindrically formed using 1/2 inch diameter holes (Orifices) with a nominal 50% open area across the surface of the screen.
2. Maximum area of each orifice: 0.2 square -inches.
3. Screen deburred AISI 316 stainless steel.
4. Trunnions top and bottom of drum ASTM A564 Grade 630 condition H1150 (17-4) stainless steel.
B. Mechanical Seal and Bearing Cartridges -Severe Duty
1. Seals and bearing incorporated into a cartridge style design requiring no external seal flush or lubricants to operate wet or dry.
2. Rated for maximum operating depth: 346 feet (150 psi).
3. Secondary lip seal with grease barrier.
4. Dynamic and Static seal faces to be Tungsten carbide with 6% nickel binder.
5. Cartridge bushing and housing are AISI 316 stainless steel.
6. O -rings to be Viton (Fluorocarbon).
C. End housings
1. Cast ASTM A48 Class 30 gray iron.
D. Shrouds and Covers
1. Shrouds
a. Glass bead blast and passivate AISI 316L stainless steel.
2. Cover
a. Manufacturing identification plate mounting on surface. b. Glass bead blast and passivate AISI 316L stainless steel.
E. Drum Baffle/ Channel Seal and Brush
1. Drum Baffle
a. Glass bead blast and passivate AISI 316L stainless steel.
2. Channel Seal
a. Buna-N rubber 60A durometer.
3. Brush
a. Nylon bristles with PVC base
F. Couplings
1. Low Speed Coupling
a. Two-piece 3 -jaw interlocking design.
b. Hardened AISI 4140 alloy steel
2. High Speed Coupling
a. Type L 3 -jaw with elastomer
b. Buna-N spider.
G. Lifting Brackets
1. AISI 316 stainless steel.
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-8
H. Speed Reducer
1. Grease lubricated cycloidal design Cyclo Series 6000 with 377:1 reduction ratio.
2. Manufacturer: Sumitomo Machinery Corporation of America.
I. Motor
1. XPNV Immersible Explosion Proof Motor: Baldor Electric Company. a. Installed Horsepower: 1 HP.
b. Motor Service Factor: 1.15.
c. Minimum Motor Efficiency (at Full Load): 85.5 percent. d. Minimum Motor Power Factor (at Full Load): 80.
e. UL rated NEMA 6P, Class I, Div. 1 Groups C&D, Class II Div. 2, Groups F&G, Class III Div. 1.
f. Manufacturer rating of 40 consecutive days of submergence at a maximum depth of 40 feet.
g. Capable of operating in air 100 percent of time with no external cooling required. h. No fan cooling during operation.
i. Utilize ceramic shaft seal requiring no oil lubrication.
2.5 SUPPORT AND INSTALLATION FRAME & LIFTING GUIDES
Frame and Guide Rails provides structure for mounting and positioning of the grinder in the integral open channel of the fiberglass manhole. Frame secures the grinder in position and provides structure and baffling to properly support and prevent unwanted bypass of material.
A. Support Frame
1. Support Frame
a. Support Frame slides into Channel Frame guide slots positioning Grinder and Solids Diverter into channel without further fastening or assembly. b. Mechanism for adjustment of the grinder to set the distance of the cutter teeth to the perforated drum of the Solids Diverter.
c. Designs that do not allow for adjustment of cutter teeth to screen are not acceptable.
d. AISI 316L stainless steel with a passivated bead blast finish.
B. Channel Frame
1. Mounts to channel walls supporting weight of grinder with suitable anchors supplied by contractor for installation.
2. Frame guide plate to allow grinder to be lifted or lowered in and out of frame with no removal of fasteners.
3. Adjustable flanges allow frame to connect to manhole integral channel walls for sealing.
C. Guide Rail
1. Provides guidance of grinder into frame of manhole.
2. Mounted to manhole walls with suitable anchors.
3. Uses guide plate mounted to grinder to interface with guide slots in rail to guide grinder into installation frame.
D. Lifting Bail
1. Mounts to top cover of grinder and provides single pick point for lifting of grinder.
2. Eyebolt 1 -1/4 -inch ID
3. Working load Limit: 35001b
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-9
E. Material & Finish
1. Fabricated of AISI 316L stainless steel.
2. Finish: No special requirements
F. Lifting Chain
1. Provides sling hook, shackle, and chain for lifting of grinder.
2. Working load Limit: 30001b
3. Material: AISI 316 stainless steel.
2.6 MOTOR CONTROLLER
A. DESIGN: NEMA 4X enclosure with programmable logic controller (PLC), operation and fail indicators, and selector switches, and pushbuttons.
B. Basis of Design:
1. Model# PC2222 as manufactured and supplied by JWC Environmental Inc. a. Motor Controller Power Supply: 460 V/ 3 PH/ 60 Hz.
b. Control and Monitoring Equipment Power Supply: 24VDC 5A C. Enclosure, Selector Switches, Pushbuttons and Pilot Lights
1. Enclosure NEMA 4X
a. 316SS with hinged door and mounting flanges.
b. Selector Switches: (2) 30 mm, three -position, rated equal or better than the enclosure and indicate On-Off/Reset-Remote for Grinder and Screen. c. Pilot Lights: 30 mm, LED (pilot lamp), rated equal or better than the enclosure and indicate POWER ON, GRINDER RUN, SCREEN RUN, and MOTOR FAULT.
d. Red mushroom style Emergency Stop pushbutton and 30mm Black Reset Pushbutton.
e. Inner door for mounting of pilot devices, selector switches and touchscreen. Thus outer door will be blank and not include windows, pilot devices or equipment. f. 316SS Sun shade and mounting hardware.
1) A.E. Stainless Direct — SS-ESS-PBS1 Stainless Steel Sunshade made to fit dimensions of grinder control panel. Or approved equal.
D. Programmable Logic Controller
1. Basis of Design: Allen Bradley Compact Logix 1769 Series a. 1769-L30ER Processor 2MB
b. 1769-IQ16 16PT Discrete Input Module
c. 1769-IF8 8PT Analog Input Module
d. 1769-0W8I 8PT Analog Output Module (x2)
e. 1769-PB2 PLC Rack Power Supply
f. 1769-ECR End Cap Right
g. Ethernet IP Provisions
E. Operator Interface Terminal
1. Basis of Design: Allen Bradley Panelview 7
a. 2711P -T6 Panelview Plus 7-6" Touchscreen
b. Touch Operation, Color TFT LCD Screen
c. 512MB memory
d. Configuration Factory Talk Software
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-10
e. SD Card Slot
f. To be installed on the inner door of the panel
F. Motor Starters, Overload Relays and Control Power Transformer:
1. Starters
a. IEC, full voltage, and reversing.
b. Maximum short circuit protective fault current 100 kA.
2. Overload Relays
a. Adjustable and sized to full load amperes (FLA) of the motor.
3. Control Power Transformer
a. Produce 120 -volt AC power from the supply power. Sized and fused in accordance with code to accommodate the control power requirements.
G. Current Transducers
1. 4-20mA analog output.
H. Operation:
1. Grinder Control: In accordance with ON-OFF/RESET-REMOTE Selector Switch. a. OFF/RESET Position (OFF): De -energizes Grinder.
b. OFF/RESET Position (RESET): Clears all fault conditions. c. ON Position: Energizes Grinder
2. REMOTE Position: Grinder operates as controlled by a remote start/stop dry contact.Solids Diverter Control: In accordance with ON -OFF -AUTO selector switch setting.
a. OFF Position: Solids Diverter will not run. Motor controller faults to be cleared with RESET pushbutton.
b. ON Position: Solids Diverter will run forward.
c. AUTO Position: Solids Diverter operates as controlled by Grinder operation.
3. Emergency Stop: In accordance EMERGENCY STOP pushbutton depressed:
a. Control circuit de -energizes the PLC outputs to all motor starters, causing the coils of all motors starters to be de -energized.
b. Fail relay energizes. OIT will display message: [Emergency Stop Activated]. c. Emergency Stop condition only cleared locally by resolving the issue, resetting the EMERGENCY STOP switch and depressing the RESET pushbutton.
4. No current sensed at Grinder motor running condition: Controller will activate FAIL indicator and OIT will display message: [Grinder Fail to Run].
5. No current sensed at Solids Diverter motor running condition: Controller will activate FAIL indicator and OIT will display message: [Solids Diverter Fail to Run].
6. Grinder JAM Condition: In accordance with setting of current transducer. a. Controller will stop and reverse the Grinder motor three (3) times and activate the Grinder FAIL indicator and relay.
b. Grinder will stop operation.
7. Grinder MOTOR OVERLOAD Condition: In accordance with setting of Motor Overload Relay.
a. The MOTOR FAULT indicator lamp will be illuminated, and the FAIL contact will be closed.
b. Grinder will stop operation.
8. Grinder MOTOR OVERTEMP Condition: In accordance with setting of Motor Thermostat. (Only with applicable motors).
a. The MOTOR FAULT indicator lamp will be illuminated, and the FAIL contact
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-11
will be closed.
b. Grinder will stop operation.
9. Solids Diverter MOTOR OVERLOAD Condition: Motor will be de -energized. a. The FAULT indicator lamp will be illuminated, and the FAIL contact will be closed. OIT will display message: [Solids Diverter Motor Overload]. b. Solids Diverter will stop operation.
c. Grinder will continue to operate.
10. Solids Diverter MOTOR OVERTEMP Condition: Motor will be de -energized. a. The FAULT indicator lamp will be illuminated, and the FAIL contact will be closed. OIT will display message: [Solids Diverter Motor Overtemp.]. b. Solids Diverter will stop operation.
c. Grinder will continue to operate.
11. Power Failure:
a. While System is Operating: System shall not return to normal operation until power is restored and START pushbutton is pressed.
b. While System is in a Fail Condition: System shall return to a fail state when power is restored. The fail state shall not be cleared until reset.
12. Reset of Grinder and Solids Diverter: Accomplished from the controller only.
13. Remote monitoring and Control
a. Provide dry contact outputs for the following signals: REMOTE position, grinder RUNNING status, Solids Diverter RUNNING status, and grinder FAIL status. b. Accept from a dry contact output from the remote control system a grinder REMOTE START command.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Coordinate installation of the equipment in accordance with the manufacturer's installation instructions, approved submittals, and in accordance with OSHA, local, state, and federal codes, and regulations.
3.2 FIELD QUALITY CONTROL
A. INSPECTION
1. The manufacturer is required to provide the services of a factory or manufacturer's representative for a minimum of one day to inspect the equipment for proper installation, apply power for the first time and check for proper motor rotation, oversee the initial introduction of material into the system and confirm the equipment operates as intended.
B. TRAINING
1. Field training for operations, maintenance, and supervisory staff members is to be provided by a manufacturer or manufacturer's representative. Field instruction shall cover key components of the equipment, operating and maintenance requirements and troubleshooting techniques.
3.3 SPARE PARTS
1. Provide any recommended spare parts listed in the O&M manual to cover the first 12 months of operation.
END OF SECTION 462433
CITY OF BEAUMONT MANHOLE GRINDER SYSTEM
MESA LIFT STATION UPGRADE 462433-12
BEAUMONTA C A L I F O R N I
California Levine Act Statement
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any Beaumont City Council Member from participating in any action related to a contract or application if he or she receives any political contributions totaling more than $250 within the previous twelve months, and for three months following the date a final decision from the business or applicant.
The Levine Act also requires a member of the Beaumont City Council who has received such a contribution to disclose the contribution on the record of the proceeding.
Current Beaumont City Council Members are listed at:
https://www.beaumontca.gov/29/City-Council
Proposers are responsible for accessing this link to review the names prior to answering the following questions.
1. Have you or your company, or any agent on behalf of you or your company, made any political contributions of more than $250 to any Beaumont City Council Member in the 12 months preceding the date of the submission of your proposal or application, or the anticipated date of any Council action?
YES If yes, please identify the Council Member(s):
NO
2. Do you or your company, or any agency on behalf of you or your company, anticipate or plan to make any political contribution of more than $250 to any Beaumont City Council Member in the 12 months following any Council action related to your proposal or application? DYES If yes, please identify the Council Member(s):
NO
Answering yes to either of the two questions above does not preclude the Beaumont City Council from awarding a contract or approving an application or any subsequent action. It does however, preclude the identified Council Member(s) from participating in any actions related to your proposal or application.
9/25/24
Date
2024.09.25 13:04:43
-07'00'
Signature of authorized individual
Borden Excavating,Bryce Borden
Company/Applicant Name
City of Beaumont 1 550 E. 6th Street, Beaumont, CA 92223 1 (951) 769-8520 1 BeaumontCA.gov
BAUME ONTA -C A L I F O R N I
Staff Report
TO: City Council
FROM: Thaxton Van Belle, Director of Reclamation
Kenyon Potter, Principal Engineer
DATE October 15, 2024
SUBJECT: Award a Professional Services Agreement to Converse Consultants for materials testing services during Construction of the Mesa Lift Station Upgrade Project (CIP WW -11)
Description Materials testing services during construction of the Mesa Lift Station Upgrade Project (CIP WW -11)
Background and Analysis:
As reported in preceding action item, staff is anticipating commencement of construction of the Mesa Lift Station Upgrade Project (CIP WW -11) in 2024. The construction project includes a large cast -in -place concrete basin which requires soil compaction testing, concrete sampling and testing, and related inspection.
On September 6, 2024, staff issued an RFP for materials testing services and related inspection during construction of the Project. On September 16, 2024, five (5) proposals were received and evaluated. The following is a summary of the received proposals:
1. Converse Consultants
2. Sladden Engineering
3. RMA Group
4. MTGL Inc.
5. Verdantas
$ 17,510
$ 18,240
$ 22,000
$ 26,624
$ 29,781
After evaluation of qualifications and price, Converse Consultants were selected. City staff is recommending the City Council award a professional services agreement to Converse Consultants for soil compaction and materials testing and related inspection during construction of the Mesa Lift Station Upgrade Project.
Fiscal Impact:
The cost to prepare this staff report is estimated to be $250. Construction cost for the Project will be paid from the Mesa Lift Station Upgrade Project (CIP W-11). The following is a summary of the Project budget and funding:
CIP WW -11 Mesa Lift Station- Construction Project Funding Summary Estimated Total Project Budget= $7,990,129
Current Project Budget= $7,990,129
CIP WW -11 Mesa Lift Station- Construction Project Budget Summary Project
Component
Est. Total
Budget
Current
Budget
Paid to
Date
Remaining
Bud s et
P
Preliminary Services
Environmental
Design
Permits
1 Right -of -Way
Cons
I $7,7411M1 $7,741,569
$7,741,569
Construction Management $248,560 $248,560
$248,560
Equipment
otal
$7,990,129
$7,990,129
$7,990,129
* The design for the project was completed under CIP WW -04/05 when project was part of the combined Force Main and Lift Station Project.
The professional services agreement with Converse Consultants for soil compaction and materials testing and related services during construction will be in an amount not to exceed $17,510. Currently, Converse Consultants is engaged in active contracts for other projects with the City and the cumulative total exceeds the City Manager signing authority for Professional Services, therefore, any items for this vendor must have City Council approval.
Recommended Action:
Award a Professional Services Agreement to Converse Consultants for materials testing and related inspection services during construction of the Mesa Lift Station Upgrade Project (CIP WW -11 in an amount not to exceed $17,510.
Attachments:
A. Request for Proposals
B. Professional Services Agreement (Converse Consultants) C. Levine Act Statement — Converse Consultants
'''..:-.=-••••••••-••■•,......1
BEAUMONT
-CALIFORNIA
Website:
www.ci.beaumont.ca.us
Address:
550 E. 6th Street
Beaumont, CA 92223
Phone:
951.769.8520
Request for Proposal #WW-MLS24-2
Fo
r
Material Testing Services for the
Mesa Lift Station Upgrade Project (WW -1 1)
Questions Due By:
September 12, 2024
2:00 pm
Proposals Due By:
September 16, 2024
2:00 pm
Contact:
Kenyon Potter
Principal Engineer
[email protected]
RFP Available:
www.beaumontca.gov
City of Beaumont Request for Proposal
Introduction
M Materials Testing Services - Mesa Lift
BEAUONT
c�a,�Mua Station Upgrade Project
vo
The City of Beaumont (City) is seeking proposals from qualified firms (Consultant) interested in providing Materials Testing Services during the Construction Phase for the City of Beaumont Mesa Lift Station Upgrade Project (CIP WW -11). The Mesa Lift Station is located at 12940 Potrero Blvd, Beaumont, CA.
All services provided by the Consultant shall be performed by individuals who meet the qualifications, education, and certification/licensing requirements for the position. The successful Consultant shall also have the resources to provide cost effective and timely services to the City.
Qualified firms that submit a proposal will be evaluated in accordance with the requirements defined within this RFP. Upon successful negotiations with the City, the selected firm will provide Engineering Support Services during the construction phase for the Mesa Lift Station Upgrade Project (WW -11) as described in this RFP.
Background
The City of Beaumont was incorporated in November 1912. The City is located in the western portion of Riverside County and is bounded on the west by Calimesa and unincorporated areas, on the north by the unincorporated County areas (Cherry Valley), on the south by unincorporated County areas and the City of San Jacinto, and on the east by the City of Banning. The land area within the City's boundaries is approximately 26 square miles.
As part of the project, the City is building a large concrete basin for emergency storage of wastewater. Materials testing services are needed for the construction of the concrete basin and related backfill work. The basin is estimated to have a construction duration of 90 days.
Scope of Services
The Scope of Services for Materials Testing Services is as follows:
• Perform soil compaction testing and related services. • Perform inspection of concrete formwork and reinforcing. • Perform testing of ready -mix concrete for slump and strength by taking 6" dia x12" cylinders.
1
City of Beaumont Request for Proposal
Additional Responsibilities
M Materials Testing Services - Mesa Lift
BEAUONT
c� u,a Station Upgrade Project
The Consultant shall be responsible for completing the specified services in accordance with the City's Professional Services Agreement (Exhibit A).
Term
The term of the agreement shall be determined upon need of services and consistent with the City's policies. The initial period of the contract is for one year, with a one-year extension as approved by City Council, subject to agreement terms and the Beaumont Municipal Code.
rroposai Requirements
The proposal shall clearly address all of the information requested herein. To achieve a uniform review process and obtain the maximum degree of comparability, it is required that proposals be organized and contain all information as specified below.
A. Cover Letter: Maximum of two pages serving as an Executive Summary which shall include an understanding of the scope of services. The RFP shall be transmitted with a cover letter that must be signed by an official authorized to bind the consultant contractually. That letter accompanying the RFP shall also provide the name, title, address, and telephone number of individuals with the authority to negotiate and contractually bind the consultant. The cover letter constitutes certification by the consultant, under penalty of perjury, that the consultant complies with nondiscrimination requirements of the State and Federal Government. An unsigned proposal or one signed by an individual unauthorized to bind the consultant may be rejected.
B. Introduction/Information: Introduction of the service proposal, including a statement of understanding for the types of services contemplated. Provide a discussion on how the objectives of the scope of services will be accomplished.
Provide the name of the firm submitting the proposal, its mailing address, telephone number, and the name of the individual to contact if further information is required.
Any participating firms and proposed sub -consultants shall be identified and included in the proposal (all sub -consultants must be approved by City prior to signing the agreement with City).
C. Approach: The firm's approach to delivering the scope of services. Provide a description of the firm's approach to communicating effectively with City staff and officials, other jurisdictional stakeholders, and the public, to facilitate successful 1
City of Beaumont Request for Proposal
delivery of assigned tasks.
M Materials Testing Services - Mesa Lift
BEAUONT
c� ua Station Upgrade Project
D. Firm Profile: Provide a description of the firm, including number of professional personnel, years in business, office location(s), organizational structure (e.g., corporation, partnership, sole practitioner, etc.), areas of particular expertise, etc.
E. Location: Location of principal office that will be responsible for the implementation of this contract.
F. Organization. Key Personnel. and Resumes: Provide an organizational chart and a summary description of the key personnel who will be involved in this project, their roles and responsibilities, and their experience in similar past projects. The proposal must name a project manager. In addition to this summary, full resumes should be provided.
G. Project Experience: Provide a list of at least three projects related to scope of the work within the last five years.
H. References: Three to five references to include: name, address, contact person and phone number of the company, length of time services were provided, and a description of the services provided.
I. Scope of Services: Provide a description of the tasks, sub -tasks, and deliverables that will be provided. The Scope of Work Program should be presented in a logical format that can be easily attached to the Professional Services Agreement.
1. Cost proposal: The cost proposal (including hourly rate for staff and unit pricing for testing) shall be submitted in a separate sealed envelope. This should include a fee schedule, a not -to -exceed fee estimate broken down and itemized based on the Scope of Services, and hourly billable costs for the itemized Scope of Services. All hourly fee schedules should be based on the consultant's current fee schedule rates. Rates shall be fixed for the duration of the project. The cost proposal shall clearly identify the estimated man-hours by classification and expenses required for each task, separated by team members, including all sub -consultants and contractors required to complete the Scope of Services.
K. Additional Information: Any other information which should be considered, such as any special services or customer service philosophy which define your firm's practice.
L. Insurance/ Certification: The firm will be required to have professional liability insurance including liability at a minimum of one million per occurrence, worker's compensation, and vehicle coverage including comprehensive and collision insurance 2
City of Beaumont Request for Proposal
Materials Testing Services - Mesa Lift
BEAUMONT
c��, Station Upgrade Project
naming the City of Beaumont as additional insured. The proposal shall state whether such insurances will be in force at time of contract execution.
Submittal
One (1) color digital PDF copy of the proposal must be submitted no later than 2:00pm, Monday, Sept 16, 2024. Proposals may be submitted through Public Purchase by the due date. Postmarks and faxes are not acceptable. Proposal must be titled "RFP WW-MLS24-2 for Engineering Support Services for the Mesa Lift Station Upgrade". Proposals and questions regarding this RFP shall be directed in writing to:
Kenyon Potter
Principal Engineer
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223
[email protected]
No postmarked proposals will be accepted. Once submitted, proposals, including the composition of the consulting staff, cannot be altered without prior written consent of the City.
All costs associated with preparation of any proposal shall be the sole responsibility of the proposer. Each proposal shall be limited to a maximum of 30 pages (not including resumes), using minimum 12 -point font size.
*DUE DATE FOR QUESTIONS IS SEPTEMBER 12, 2024, AT 2:00 PM.
All questions and answers will be posted on Public Purchase within one week of the question due date.
Confidentiality
Prior to the proposal submittal deadline, all proposals will be designated confidential to the extent permitted by the California Public Records Act. After the proposal submittal deadline, all responses will be regarded as public record and will be subject to review by the public. Any language purported to render confidential all or portions of the proposals will be regarded as non -effective and will be disregarded.
Amendments to Request for Proposals
The City reserves the right to amend the RFP by addendum prior to the final proposal 3
City of Beaumont Request for Proposal
submittal date.
Non -Commitment to City
M Materials Testing Services - Mesa Lift
BEAUONT
c�a,� ua Station Upgrade Project
vut
The City reserves the right to reject any and all proposals and to waive informalities and minor irregularities in any proposal reviewed. The City may reject any proposal that does not conform to the instructions provided in this RFP. Additionally, the City reserves the right to negotiate all final terms and conditions of any proposal received before entering into final contract.
Conflicr or interest
The Consultant shall disclose any personal or professional financial, business, or other relationships with the City that may have an impact on the outcome of this contract or any resulting project. The consultant shall also list current clients who may have a financial interest in the outcome of this contract.
rroposal evaluation/beiection
The City intends to engage the most qualified consultant available that demonstrates a thorough understanding of the City's needs. City staff will use the following criteria to evaluate the proposals:
Criteria
Points
Understanding of the Scope of Services
25 Demonstrated Qualifications, Professional Skill and Credentials 25 Related Experience
25 Approach to Performing this Type of Service
25 Total
100
The City may request a qualification interview with the highest ranked consultant(s) prior to determining the final ranking. This selection will be conducted according to the City's adopted procedures. The City reserves the right to reject any and all proposals.
Exhibits
A. Sample Professional Services Agreement
4
City of Beaumont Request for Proposal Materials Testing Services - Mesa Lift BEAUMONT Station Upgrade Project
Ctitticvu,a
END OF REQUEST FOR PROPOSAL
EXHIBITS TO FOLLOW
.. •
5
City of Beaumont Request for Proposal
(,[lkl,&csh4IA(b
Materials Testing Services - Mesa Lift
Station Upgrade Project
EXHIBIT A
Sample Professional Services Agreement
.. •
6
City of Beaumont Agreement #
C24-XX
AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR
THIS AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR is made and effective as of the _t" day of 2024, by and between the CITY OF BEAUMONT ("CITY") whose address is 550 E. 6th Street, Beaumont, California 92223 and EXP U.S. Services, a California Corporation, whose address is 205 N. Michigan, Suite 3600, Chicago, IL 60601 ("CONTRACTOR").
RECITALS
This Agreement is entered into on the basis of the following facts, understandings and intentions of the parties to this Agreement:
A. CITY desires to engage CONTRACTOR to provide professional engineering services for preparation of the Traffic Impact Analysis Report & ALTA/NSPS Title Survey; and B. CONTRACTOR has made a proposal ("Proposal") to the CITY to provide such professional services, which Proposal is attached hereto as Exhibit "A" and incorporated herein by this reference; and
C. CONTRACTOR agrees to provide such services pursuant to, and in accordance with, the terms and conditions of this Agreement, and represents and warrants to CITY that CONTRACTOR possesses the necessary skills, licenses, certifications, qualifications, personnel and equipment to provide such services.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals and mutual covenants contained herein, CITY and CONTRACTOR agree as follows:
1. Term of Agreement. This Agreement is effective as of the date first above written and shall continue until terminated as provided for herein. Notwithstanding anything in this Agreement to the contrary, this Agreement shall automatically terminate after one (1) year(s) unless extended by the parties with the approval of the City Council of the CITY.
2. Services to be Performed. CONTRACTOR agrees to provide the services ("Services") as follows: Professional Engineering Services per Exhibit "A". All Services shall be performed in the manner and according to the timeframe set forth in the Proposal.
CONTRACTOR designates Syed Raza, PE. as CONTRACTOR'S professional(s) responsible for overseeing the Services provided by CONTRACTOR.
3. Associates and Subcontractors. CONTRACTOR may, at CONTRACTOR's sole cost and expense, employ such competent and qualified independent associates, subcontractors and consultants as CONTRACTOR deems necessary to perform the Services; provided, however, that CONTRACTOR shall not subcontract any of the Services without the written consent of CITY.
4. Compensation.
4.01 CONTRACTOR shall be paid at the rates set forth in the Proposal and shall not increase any rate without the prior written consent of the CITY. Notwithstanding anything in this Agreement to the contrary, total fees and charges paid by CITY to
City of Beaumont Agreement #
C24-XX
CONTRACTOR under this Agreement shall not exceed Dollars ($ )•
4.02 CONTRACTOR shall not be compensated for any Services rendered nor reimbursed for any expenses incurred in excess of those authorized unless approved in advance by the CITY, in writing.
4.03 CONTRACTOR shall submit to CITY, on or before the fifteenth (15th) of each month, itemized invoices for the Services rendered in the previous month. The CITY shall not be obligated to pay any invoice that is submitted more than sixty (60) days after the due date of such invoice. CITY shall have the right to review and audit all invoices prior to or after payment to CONTRACTOR. This review and audit may include, but not be limited to CITY's:
a. Determination that any hourly fee charged is consistent with this Agreement's approved hourly rate schedule;
b. Determination that the multiplication of the hours billed times the approved rate schedule dollars is correct;
c. Determination that each item charged is the usual, customary, and reasonable charge for the particular item. If CITY determines an item charged is greater than usual, customary, or reasonable, or is duplicative, ambiguous, excessive, or inappropriate, CITY shall either return the bill to CONTRACTOR with a request for explanation or adjust the payment accordingly, and give notice to CONTRACTOR of the adjustment.
4.04 If the work is satisfactorily completed, CITY shall pay such invoice within thirty (30) days of its receipt. Should CITY dispute any portion of any invoice, CITY shall pay the undisputed portion within the time stated above, and at the same time advise CONTRACTOR in writing of the disputed portion.
5. Obligations of CONTRACTOR.
5.01 CONTRACTOR agrees to perform all Services in accordance with the terms and conditions of this Agreement and the Proposal. In the event that the terms of the Proposal shall conflict with the terms of this Agreement or contain additional terms that purport to bind the CITY other than the Services to be rendered and the price for the Services, the terms of this Agreement shall govern and said additional or conflicting terms shall be of no force or effect.
5.02 Except as otherwise agreed by the parties, CONTRACTOR will supply all personnel, materials and equipment required to perform the Services. CONTRACTOR shall provide its own offices, telephones, vehicles and computers and set its own work hours. CONTRACTOR will determine the method, details, and means of performing the Services under this Agreement.
5.03 CONTRACTOR shall keep CITY informed as to the progress of the Services by means of regular and frequent consultations. Additionally, when requested by CITY, CONTRACTOR shall prepare written status reports.
5.04 CONTRACTOR is responsible for paying, when due, all income and other taxes, fees and withholding, including withholding state and federal taxes, social
City of Beaumont Agreement #
C24-XX
security, unemployment and worker's compensation, incurred as a result of the compensation paid under this Agreement. CONTRACTOR agrees to indemnify, defend and hold harmless CITY for any claims, costs, losses, fees, penalties, interest, or damages suffered by CITY resulting from CONTRACTOR's failure to comply with this provision.
5.05 In the event CONTRACTOR is required to prepare plans, drawings, specifications and/or estimates, the same shall be furnished in conformance with local, state and federal laws, rules and regulations.
5.06 CONTRACTOR represents that it possesses all required licenses necessary or applicable to the performance of Services under this Agreement and the Proposal and shall obtain and keep in full force and effect all permits and approvals required to perform the Services herein. In the event CITY is required to obtain an approval or permit from another governmental entity, CONTRACTOR shall provide all necessary supporting documents to be filed with such entity.
5.07 CONTRACTOR shall be solely responsible for obtaining Employment Eligibility Verification information from CONTRACTOR's employees, in compliance with the Immigration Reform and Control Act of 1986, Pub. L. 99-603 (8 U.S.C. 1324a), and shall ensure that CONTRACTOR's employees are eligible to work in the United States.
5.08 In the event that CONTRACTOR employs, contracts with, or otherwise utilizes any CaIPERS retirees in completing any of the Services performed hereunder, such instances shall be disclosed in advance to the CITY and shall be subject to the CITY's advance written approval.
5.09 Drug -free Workplace Certification. By signing this Agreement, the CONTRACTOR hereby certifies under penalty of perjury under the laws of the State of California that the CONTRACTOR will comply with the requirements of the Drug -Free Workplace Act of 1990 (Government Code, Section 8350 et seq.) and will provide a drug -free workplace.
5.10 CONTRACTOR shall comply with all applicable local, state and federal laws, rules, regulations, entitlements and/or permits applicable to, or governing the Services authorized hereunder.
6. Insurance. CONTRACTOR hereby agrees to be solely responsible for the health and safety of its employees and agents in performing the Services under this Agreement and shall comply with all laws applicable to worker safety including but not limited to Cal - OSHA. Therefore, throughout the duration of this Agreement, CONTRACTOR hereby covenants and agrees to maintain insurance in conformance with the requirements set forth below. Attached hereto as Exhibit "B" are copies of Certificates of Insurance and endorsements as required by Section 7.02. If existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so. CONTRACTOR shall provide the following types and amounts of insurance:
6.01 Commercial general liability insurance in an amount of not less than $1,000,000 per occurrence and $2,000,000 in the aggregate; CONTRACTOR agrees to have its insurer endorse the general liability coverage required herein to include as additional insured's CITY, its officials, employees and agents. CONTRACTOR also
City of Beaumont Agreement #
C24-XX
agrees to require all contractors and subcontractors to provide the same coverage required under this Section 6.
6.02 Business Auto Coverage in an amount no less than $1 million per accident. If CONTRACTOR or CONTRACTOR's employees will use personal autos in performance of the Services hereunder, CONTRACTOR shall provide evidence of personal auto liability coverage for each such person.
6.03 Workers' Compensation coverage for any of CONTRACTOR's employees that will be providing any Services hereunder. CONTRACTOR will have a state - approved policy form providing statutory benefits as required by California law. The provisions of any workers' compensation will not limit the obligations of CONTRACTOR under this Agreement. CONTRACTOR expressly agrees not to use any statutory immunity defenses under such laws with respect to CITY, its employees, officials and agents.
6.04 Optional Insurance Coverage. Choose and check one: Required X /Not Required _; Errors and omissions insurance in a minimum amount of $2 million per occurrence to cover any negligent acts or omissions committed by CONTRACTOR, its employees and/or agents in the performance of any Services for CITY.
7. General Conditions pertaining to Insurance Coverage
7.01 No liability insurance coverage provided shall prohibit CONTRACTOR from waiving the right of subrogation prior to a loss. CONTRACTOR waives all rights of subrogation against CITY regardless of the applicability of insurance proceeds and shall require all contractors and subcontractors to do likewise.
7.02. Prior to beginning the Services under this Agreement, CONTRACTOR shall furnish CITY with certificates of insurance, endorsements, and upon request, complete copies of all policies, including complete copies of all endorsements. All copies of policies and endorsements shall show the signature of a person authorized by that insurer to bind coverage on its behalf.
7.03. All required policies shall be issued by a highly rated insurer with a minimum A.M. Best rating of "A:VII"). The insurer(s) shall be admitted and licensed to do business in California. The certificates of insurance hereunder shall state that coverage shall not be suspended, voided, canceled by either party, or reduced in coverage or in limits, except after thirty (30) days' prior written notice has been given to CITY.
7.04 Self-insurance does not comply with these insurance specifications.
CONTRACTOR acknowledges and agrees that that all insurance coverage required to be provided by CONTRACTOR or any subcontractor, shall apply first and on a primary, non-contributing basis in relation to any other insurance, indemnity or self-insurance available to CITY.
7.05 All coverage types and limits required are subject to approval, modification and additional requirements by CITY, as the need arises. CONTRACTOR shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect CITY's protection without CITY's prior written consent.
City of Beaumont Agreement #
C24-XX
7.06 CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against CONTRACTOR or arising out of the Services performed under this Agreement. CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.
8. Indemnification.
8.01 CONTRACTOR and CITY agree that CITY, its employees, agents and officials should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys' fees, litigation costs, defense costs, court costs or any other costs arising out of or in any way related to the performance of this Agreement by CONTRACTOR or any subcontractor or agent of either as set forth herein. Accordingly, the provisions of this indemnity are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to CITY. CONTRACTOR acknowledges that CITY would not enter into this Agreement in the absence of the commitment of CONTRACTOR to indemnify and protect CITY as set forth herein.
a. To the fullest extent permitted by law, CONTRACTOR shall defend, indemnify and hold harmless CITY, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses, damages or costs of any kind, whether actual, alleged or threatened, actual attorneys' fees incurred by CITY, court costs, interest, defense costs, including expert witness fees and any other costs or expenses of any kind whatsoever without restriction or limitation incurred in relation to, as a consequence of or arising out of, or in any way attributable actually, allegedly or impliedly, in whole or in part to the performance of this Agreement. CONTRACTOR's obligation to defend, indemnify and hold harmless shall include any and all claims, suits and proceedings in which CONTRACTOR (and/or CONTRACTOR's agents and/or employees) is alleged to be an employee of CITY. All obligations under this provision are to be paid by CONTRACTOR as they are incurred by CITY.
b. Without affecting the rights of CITY under any provision of this Agreement or this Section, CONTRACTOR shall not be required to indemnify and hold harmless CITY as set forth above for liability attributable solely to the fault of CITY, provided such fault is determined by agreement between the parties or the findings of a court of competent jurisdiction. 8A. Indemnification Design Professionals.
8A.01 In the event that CONTRACTOR is a design professional under California Civil Code Section 2782.8 this Section 8A shall apply instead of Section 8. To the fullest extent permitted by California law and in accordance with California Civil Code section 2782.8, CONTRACTOR shall indemnify, and hold harmless the City, its officers, employees, trustees and members ("Indemnified Parties") from any and all actions, assessments, counts, citations, claims, costs, damages, demands, judgments, liabilities (legal, administrative or otherwise), losses, notices, expenses, fines, penalties, proceedings, responsibilities, violations, attorney's and consultants' fees and causes of action including, but not limited to those for, injury to property or persons, including personal injury and/or death ("Claim(s)"), to the extent that the Claim(s) arises out of, pertains to, or relates to the negligence, recklessness, or willful misconduct of CONTRACTOR, its directors, officials, officers, employees and consultants arising out of, connected with, or
City of Beaumont Agreement #
C24-XX
resulting from the performance of the Services, the Project, or this Agreement. This indemnity excludes liability caused by the negligence or willful misconduct of any of the Indemnified Parties. The cost to indemnify, hold harmless, and defend charged to CONTRACTOR shall not exceed CONTRACTOR'S proportionate percentage of fault.
9. Additional Services, Changes and Deletions.
9.01 In the event CONTRACTOR performs additional or different services than those described herein without the prior written approval of the City Manager and/or City Council of CITY, CONTRACTOR shall not be compensated for such services.
CONTRACTOR expressly waives any right to be compensated for services and materials not covered by the scope of this Agreement or authorized by the CITY in writing.
9.02 CONTRACTOR shall promptly advise the City Manager and Finance Director of CITY as soon as reasonably practicable upon gaining knowledge of a condition, event or accumulation of events which may affect the scope and/or cost of Services. All proposed changes, modifications, deletions and/or requests for additional services shall be reduced to writing for review and approval by the CITY and/or City Council.
10. Termination of Agreement.
10.01 Notwithstanding any other provision of this Agreement, CITY, at its sole option, may terminate this Agreement with or without cause, or for no cause, at any time by giving twenty (20) days' written notice to CONTRACTOR.
10.02 In the event of termination, the payment of monies due CONTRACTOR for undisputed Services performed prior to the effective date of such termination shall be paid within thirty (30) business days after receipt of an invoice as provided in this Agreement. Immediately upon termination, CONTRACTOR agrees to promptly provide and deliver to CITY all original documents, reports, studies, plans, specifications and the like which are in the possession or control of CONTRACTOR and pertain to CITY.
11. Status of CONTRACTOR.
11.01 CONTRACTOR shall perform the Services in CONTRACTOR's own way as an independent contractor, and in pursuit of CONTRACTOR's independent calling, and not as an employee of CITY. However, CONTRACTOR shall regularly confer with CITY's City Manager as provided for in this Agreement.
11.02 CONTRACTOR agrees that it is not entitled to the rights and benefits afforded to CITY's employees, including disability or unemployment insurance, workers' compensation, retirement, CaIPERS, medical insurance, sick leave, or any other employment benefit. CONTRACTOR is responsible for providing, at its own expense, disability, unemployment, workers' compensation and other insurance, training, permits, and licenses for itself and its employees and subcontractors.
11.03 CONTRACTOR hereby specifically represents and warrants to CITY that it possesses the qualifications and skills necessary to perform the Services under this Agreement in a competent, professional manner, without the advice or direction of CITY
City of Beaumont Agreement #
C24-XX
and that the Services to be rendered pursuant to this Agreement shall be performed in accordance with the standards customarily applicable to an experienced and competent professional rendering the same or similar services in the same geographic area where the CITY is located. Further, CONTRACTOR represents and warrants that the individual signing this Agreement on behalf of CONTRACTOR has the full authority to bind CONTRACTOR to this Agreement.
12. Ownership of Documents; Audit.
12.01 All draft and final reports, plans, drawings, studies, maps, photographs, specifications, data, notes, manuals, warranties and all other documents of any kind or nature prepared, developed or obtained by CONTRACTOR in connection with the performance of Services performed for the CITY shall become the sole property of CITY, and CONTRACTOR shall promptly deliver all such materials to CITY upon request. At the CITY's sole discretion, CONTRACTOR may be permitted to retain original documents, and furnish reproductions to CITY upon request, at no cost to CITY.
12.02 Subject to applicable federal and state laws, rules and regulations, CITY shall hold all intellectual property rights to any materials developed pursuant to this Agreement. CONTRACTOR shall not such use data or documents for purposes other than the performance of this Agreement, nor shall CONTRACTOR release, reproduce, distribute, publish, adapt for future use or any other purposes, or otherwise use, any data or other materials first produced in the performance of this Agreement, nor authorize others to do so, without the prior written consent of CITY.
12.03 CONTRACTOR shall retain and maintain, for a period not less than four years following termination of this Agreement, all-time records, accounting records and vouchers and all other records with respect to all matters concerning Services performed, compensation paid and expenses reimbursed. At any time during normal business hours and as often as CITY may deem necessary, CONTRACTOR shall make available to CITY's agents for examination all of such records and shall permit CITY's agents to audit, examine and reproduce such records.
13. Miscellaneous Provisions.
13.01 This Agreement, which includes all attached exhibits, supersedes any and all previous agreements, either oral or written, between the parties hereto with respect to the rendering of Services by CONTRACTOR for CITY and contains all of the covenants and agreements between the parties with respect to the rendering of such Services in any manner whatsoever. Any modification of this Agreement will be effective only if it is in writing signed by both parties.
13.02 CONTRACTOR shall not assign or otherwise transfer any rights or interest in this Agreement without the prior written consent of CITY. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement.
13.03 CONTRACTOR shall timely file FPPC Form 700 Conflict of Interest Statements with CITY if required by California law and/or the CITY's conflict of interest policy.
13.04 If any legal action or proceeding, including an action for declaratory relief,
City of Beaumont Agreement #
C24-XX
is brought to enforce or interpret the provisions of this Agreement, the prevailing party will be entitled to reasonable attorneys' fees and costs, in addition to any other relief to which that party may be entitled.
13.05 This Agreement is made, entered into and shall be performed in the County of Riverside in the State of California and shall in all respects be interpreted, enforced and governed under the laws of the State of California. The parties agree that venue in any litigation between them shall be in Riverside County, California.
13.06 CONTRACTOR covenants that neither it nor any officer or principal of its firm has any interest, nor shall they acquire any interest, either directly or indirectly, which will conflict in any manner or degree with the performance of their Services hereunder. CONTRACTOR further covenants that in the performance of this Agreement, no person having such interest shall be employed by it as an officer, employee, agent, or subcontractor.
13.07 CONTRACTOR has read and is aware of the provisions of Section 1090 et seq. and Section 87100 et seq. of the Government Code relating to conflicts of interest of public officers and employees. CONTRACTOR agrees that they are unaware of any financial or economic interest of any public officer or employee of the CITY relating to this Agreement. It is further understood and agreed that if such a financial interest does exist at the inception of this Agreement, the CITY may immediately terminate this Agreement by giving notice thereof. CONTRACTOR shall comply with the requirements of Government Code section 87100 et seq. and section 1090 in the performance of and during the term of this Agreement.
13.08 Improper Consideration. CONTRACTOR shall not offer (either directly or through an intermediary) any improper consideration such as, but not limited to, cash, discounts, services, the provision of travel or entertainment, or any items of value to any officer, employee or agent of the CITY in an attempt to secure favorable treatment regarding this Agreement or any contract awarded by CITY. The CITY, by notice, may immediately terminate this Agreement if it determines that any improper consideration as described in the preceding sentence was offered to any officer, employee or agent of the CITY with respect to the proposal and award process of this Agreement or any CITY contract. This prohibition shall apply to any amendment, extension or evaluation process once this Agreement or any CITY contract has been awarded. CONTRACTOR shall immediately report any attempt by any CITY officer, employee or agent to solicit (either directly or through an intermediary) improper consideration from CONTRACTOR.
13.09 Severability. If any portion of this Agreement is declared invalid, illegal or otherwise unenforceable by a court of competent jurisdiction, the entire balance of this Agreement not so affected shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereby have made and executed this Agreement to be effective as of the day and year first above written.
CITY: CONTRACTOR:
CITY OF BEAUMONT
By: By:
City of Beaumont Agreement #
C24-XX
, Mayor
Print Name:
Title:
ATTEST:
By:
, Deputy City Clerk
APPROVED AS TO FORM:
By:
, City Attorney
City of Beaumont Agreement #
C24-XX
EXHIBIT "A"
PROPOSAL
(insert behind this page)
City of Beaumont Agreement #
C24-XX
EXHIBIT "B"
CERTIFICATES OF INSURANCE AND ENDORSEMENTS
(insert behind this page)
City of Beaumont Agreement #
C24-110
AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR
THIS AGREEMENT FOR PROFESSIONAL SERVICES BY INDEPENDENT CONTRACTOR is made and effective upon signature, by and between the CITY OF BEAUMONT ("CITY") whose address is 550 E. 6th Street, Beaumont, California 92223 and The Converse Professional Group (d.b.a. Converse Consultants), a California Corporation, whose address is 717 S. Myrtle Ave., Monrovia, CA 91016 ("CONTRACTOR").
RECITALS
This Agreement is entered into on the basis of the following facts, understandings and intentions of the parties to this Agreement:
A. CITY desires to engage CONTRACTOR to provide materials testing services for the construction phase of the City of Beaumont Mesa Lift Station Upgrade Project (CIP WW -11); and
B. CONTRACTOR has made a proposal ("Proposal") to the CITY to provide such professional services, which Proposal is attached hereto as Exhibit "A" and incorporated herein by this reference; and
C. CONTRACTOR agrees to provide such services pursuant to, and in accordance with, the terms and conditions of this Agreement, and represents and warrants to CITY that CONTRACTOR possesses the necessary skills, licenses, certifications, qualifications, personnel and equipment to provide such services.
AGREEMENT
NOW, THEREFORE, in consideration of the foregoing Recitals and mutual covenants contained herein, CITY and CONTRACTOR agree as follows:
1. Term of Agreement. This Agreement is effective as of the date first above written and shall continue until terminated as provided for herein. Notwithstanding anything in this Agreement to the contrary, this Agreement shall automatically terminate after one (1) year(s) unless extended by the parties with the approval of the City Council of the CITY.
2. Services to be Performed. CONTRACTOR agrees to provide the services ("Services") as follows: Professional Engineering Services per Exhibit "A". All Services shall be performed in the manner and according to the timeframe set forth in the Proposal. CONTRACTOR designates Hashmi Quazi, PE. as CONTRACTOR'S professional(s) responsible for overseeing the Services provided by CONTRACTOR.
3. Associates and Subcontractors. CONTRACTOR may, at CONTRACTOR's sole cost and expense, employ such competent and qualified independent associates, subcontractors and consultants as CONTRACTOR deems necessary to perform the Services; provided, however, that CONTRACTOR shall not subcontract any of the Services without the written consent of CITY.
City of Beaumont Agreement #
C24-110
4. Compensation.
4.01 CONTRACTOR shall be paid at the rates set forth in the Proposal and shall not increase any rate without the prior written consent of the CITY. Notwithstanding anything in this Agreement to the contrary, total fees and charges paid by CITY to CONTRACTOR under this Agreement shall not exceed Seventeen Thousand, Five Hundred and Ten Dollars ($17,510).
4.02 CONTRACTOR shall not be compensated for any Services rendered nor reimbursed for any expenses incurred in excess of those authorized unless approved in advance by the CITY, in writing.
4.03 CONTRACTOR shall submit to CITY, on or before the fifteenth (15th) of each month, itemized invoices for the Services rendered in the previous month. The CITY shall not be obligated to pay any invoice that is submitted more than sixty (60) days after the due date of such invoice. CITY shall have the right to review and audit all invoices prior to or after payment to CONTRACTOR. This review and audit may include, but not be limited to CITY' s:
a. Determination that any hourly fee charged is consistent with this Agreement's approved hourly rate schedule;
b. Determination that the multiplication of the hours billed times the approved rate schedule dollars is correct;
c. Determination that each item charged is the usual, customary, and reasonable charge for the particular item. If CITY determines an item charged is greater than usual, customary, or reasonable, or is duplicative, ambiguous, excessive, or inappropriate, CITY shall either return the bill to CONTRACTOR with a request for explanation or adjust the payment accordingly, and give notice to CONTRACTOR of the adjustment.
4.04 If the work is satisfactorily completed, CITY shall pay such invoice within thirty (30) days of its receipt. Should CITY dispute any portion of any invoice, CITY shall pay the undisputed portion within the time stated above, and at the same time advise CONTRACTOR in writing of the disputed portion.
5. Obligations of CONTRACTOR.
5.01 CONTRACTOR agrees to perform all Services in accordance with the terms and conditions of this Agreement and the Proposal. In the event that the terms of the Proposal shall conflict with the terms of this Agreement or contain additional terms that purport to bind the CITY other than the Services to be rendered and the price for the Services, the terms of this Agreement shall govern and said additional or conflicting terms shall be of no force or effect.
5.02 Except as otherwise agreed by the parties, CONTRACTOR will supply all personnel, materials and equipment required to perform the Services. CONTRACTOR
City of Beaumont Agreement #
C24-110
shall provide its own offices, telephones, vehicles and computers and set its own work hours. CONTRACTOR will determine the method, details, and means of performing the Services under this Agreement.
5.03 CONTRACTOR shall keep CITY informed as to the progress of the Services by means of regular and frequent consultations. Additionally, when requested by CITY, CONTRACTOR shall prepare written status reports.
5.04 CONTRACTOR is responsible for paying, when due, all income and other taxes, fees and withholding, including withholding state and federal taxes, social security, unemployment and worker's compensation, incurred as a result of the compensation paid under this Agreement. CONTRACTOR agrees to indemnify, defend and hold harmless CITY for any claims, costs, losses, fees, penalties, interest, or damages suffered by CITY resulting from CONTRACTOR's failure to comply with this provision.
5.05 In the event CONTRACTOR is required to prepare plans, drawings, specifications and/or estimates, the same shall be furnished in conformance with local, state and federal laws, rules and regulations.
5.06 CONTRACTOR represents that it possesses all required licenses necessary or applicable to the performance of Services under this Agreement and the Proposal and shall obtain and keep in full force and effect all permits and approvals required to perform the Services herein. In the event CITY is required to obtain an approval or permit from another governmental entity, CONTRACTOR shall provide all necessary supporting documents to be filed with such entity.
5.07 CONTRACTOR shall be solely responsible for obtaining Employment Eligibility Verification information from CONTRACTOR's employees, in compliance with the Immigration Reform and Control Act of 1986, Pub. L. 99-603 (8 U.S.C. 1324a), and shall ensure that CONTRACTOR's employees are eligible to work in the United States.
5.08 In the event that CONTRACTOR employs, contracts with, or otherwise utilizes any CalPERS retirees in completing any of the Services performed hereunder, such instances shall be disclosed in advance to the CITY and shall be subject to the CITY's advance written approval.
5.09 Drug -free Workplace Certification. By signing this Agreement, the CONTRACTOR hereby certifies under penalty of perjury under the laws of the State of California that the CONTRACTOR will comply with the requirements of the Drug -Free Workplace Act of 1990 (Government Code, Section 8350 et seq.) and will provide a drug - free workplace.
5.10 CONTRACTOR shall comply with all applicable local, state and federal laws, rules, regulations, entitlements and/or permits applicable to, or governing the Services authorized hereunder.
6. Insurance. CONTRACTOR hereby agrees to be solely responsible for the health
City of Beaumont Agreement #
C24-110
and safety of its employees and agents in performing the Services under this Agreement and shall comply with all laws applicable to worker safety including but not limited to Cal - OSHA. Therefore, throughout the duration of this Agreement, CONTRACTOR hereby covenants and agrees to maintain insurance in conformance with the requirements set forth below. Attached hereto as Exhibit "B" are copies of Certificates of Insurance and endorsements as required by Section 7.02. If existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so. CONTRACTOR shall provide the following types and amounts of insurance:
6.01 Commercial general liability insurance in an amount of not less than $1,000,000 per occurrence and $2,000,000 in the aggregate; CONTRACTOR agrees to have its insurer endorse the general liability coverage required herein to include as additional insured's CITY, its officials, employees and agents. CONTRACTOR also agrees to require all contractors and subcontractors to provide the same coverage required under this Section 6.
6.02 Business Auto Coverage in an amount no less than $1 million per accident.
If CONTRACTOR or CONTRACTOR's employees will use personal autos in performance of the Services hereunder, CONTRACTOR shall provide evidence of personal auto liability coverage for each such person.
6.03 Workers' Compensation coverage for any of CONTRACTOR'S employees that will be providing any Services hereunder. CONTRACTOR will have a state -approved policy form providing statutory benefits as required by California law. The provisions of any workers' compensation will not limit the obligations of CONTRACTOR under this Agreement. CONTRACTOR expressly agrees not to use any statutory immunity defenses under such laws with respect to CITY, its employees, officials and agents.
6.04 Optional Insurance Coverage. Choose and check one: Required X /Not Required _; Errors and omissions insurance in a minimum amount of $2 million per occurrence to cover any negligent acts or omissions committed by CONTRACTOR, its employees and/or agents in the performance of any Services for CITY.
7. General Conditions pertaining to Insurance Coverage
7.01 No liability insurance coverage provided shall prohibit CONTRACTOR from waiving the right of subrogation prior to a loss. CONTRACTOR waives all rights of subrogation against CITY regardless of the applicability of insurance proceeds and shall require all contractors and subcontractors to do likewise.
7.02. Prior to beginning the Services under this Agreement, CONTRACTOR shall furnish CITY with certificates of insurance, endorsements, and upon request, complete copies of all policies, including complete copies of all endorsements. All copies of policies and endorsements shall show the signature of a person authorized by that insurer to bind coverage on its behalf.
7.03. All required policies shall be issued by a highly rated insurer with a minimum
City of Beaumont Agreement #
C24-110
A.M. Best rating of "A:VII"). The insurer(s) shall be admitted and licensed to do business in California. The certificates of insurance hereunder shall state that coverage shall not be suspended, voided, canceled by either party, or reduced in coverage or in limits, except after thirty (30) days' prior written notice has been given to CITY.
7.04 Self-insurance does not comply with these insurance specifications.
CONTRACTOR acknowledges and agrees that that all insurance coverage required to be provided by CONTRACTOR or any subcontractor, shall apply first and on a primary, non- contributing basis in relation to any other insurance, indemnity or self-insurance available to CITY.
7.05 All coverage types and limits required are subject to approval, modification and additional requirements by CITY, as the need arises. CONTRACTOR shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect CITY's protection without CITY's prior written consent.
7.06 CONTRACTOR agrees to provide immediate notice to CITY of any claim or loss against CONTRACTOR or arising out of the Services performed under this Agreement. CITY assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve CITY.
8. Indemnification.
8.01 CONTRACTOR and CITY agree that CITY, its employees, agents and officials should, to the extent permitted by law, be fully protected from any loss, injury, damage, claim, lawsuit, cost, expense, attorneys' fees, litigation costs, defense costs, court costs or any other costs arising out of or in any way related to the performance of this Agreement by CONTRACTOR or any subcontractor or agent of either as set forth herein.
Accordingly, the provisions of this indemnity are intended by the parties to be interpreted and construed to provide the fullest protection possible under the law to CITY.
CONTRACTOR acknowledges that CITY would not enter into this Agreement in the absence of the commitment of CONTRACTOR to indemnify and protect CITY as set forth herein.
a. To the fullest extent permitted by law, CONTRACTOR shall defend, indemnify and hold harmless CITY, its employees, agents and officials, from any liability, claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses, damages or costs of any kind, whether actual, alleged or threatened, actual attorneys' fees incurred by CITY, court costs, interest, defense costs, including expert witness fees and any other costs or expenses of any kind whatsoever without restriction or limitation incurred in relation to, as a consequence of or arising out of, or in any way attributable actually, allegedly or impliedly, in whole or in part to the performance of this Agreement.
CONTRACTOR's obligation to defend, indemnify and hold harmless shall include any and all claims, suits and proceedings in which CONTRACTOR (and/or CONTRACTOR's agents and/or employees) is alleged to be an employee of CITY.
City of Beaumont Agreement #
C24-110
All obligations under this provision are to be paid by CONTRACTOR as they are incurred by CITY.
b. Without affecting the rights of CITY under any provision of this Agreement or this Section, CONTRACTOR shall not be required to indemnify and hold harmless CITY as set forth above for liability attributable solely to the fault of CITY, provided such fault is determined by agreement between the parties or the findings of a court of competent jurisdiction.
8A. Indemnification Design Professionals.
8A.01 In the event that CONTRACTOR is a design professional under California Civil Code Section 2782.8 this Section 8A shall apply instead of Section 8. To the fullest extent permitted by California law and in accordance with California Civil Code section 2782.8, CONTRACTOR shall indemnify, and hold harmless the City, its officers, employees, trustees and members ("Indemnified Parties") from any and all actions, assessments, counts, citations, claims, costs, damages, demands, judgments, liabilities (legal, administrative or otherwise), losses, notices, expenses, fines, penalties, proceedings, responsibilities, violations, attorney's and consultants' fees and causes of action including, but not limited to those for, injury to property or persons, including personal injury and/or death ("Claim(s)"), to the extent that the Claim(s) arises out of, pertains to, or relates to the negligence, recklessness, or willful misconduct of CONTRACTOR, its directors, officials, officers, employees and consultants arising out of, connected with, or resulting from the performance of the Services, the Project, or this Agreement. This indemnity excludes liability caused by the negligence or willful misconduct of any of the Indemnified Parties.
The cost to indemnify, hold harmless, and defend charged to CONTRACTOR shall not exceed CONTRACTOR'S proportionate percentage of fault.
9. Additional Services, Changes and Deletions.
9.01 In the event CONTRACTOR performs additional or different services than those described herein without the prior written approval of the City Manager and/or City Council of CITY, CONTRACTOR shall not be compensated for such services.
CONTRACTOR expressly waives any right to be compensated for services and materials not covered by the scope of this Agreement or authorized by the CITY in writing.
9.02 CONTRACTOR shall promptly advise the City Manager and Finance Director of CITY as soon as reasonably practicable upon gaining knowledge of a condition, event or accumulation of events which may affect the scope and/or cost of Services. All proposed changes, modifications, deletions and/or requests for additional services shall be reduced to writing for review and approval by the CITY and/or City Council.
10. Termination of Agreement.
10.01 Notwithstanding any other provision of this Agreement, CITY, at its sole option, may terminate this Agreement with or without cause, or for no cause, at any time by giving twenty (20) days' written notice to CONTRACTOR.
10.02 In the event of termination, the payment of monies due CONTRACTOR for
City of Beaumont Agreement #
C24-110
undisputed Services performed prior to the effective date of such termination shall be paid within thirty (30) business days after receipt of an invoice as provided in this Agreement.
Immediately upon termination, CONTRACTOR agrees to promptly provide and deliver to CITY all original documents, reports, studies, plans, specifications and the like which are in the possession or control of CONTRACTOR and pertain to CITY.
11. Status of CONTRACTOR.
11.01 CONTRACTOR shall perform the Services in CONTRACTOR's own way as an independent contractor, and in pursuit of CONTRACTOR's independent calling, and not as an employee of CITY. However, CONTRACTOR shall regularly confer with CITY's City Manager as provided for in this Agreement.
11.02 CONTRACTOR agrees that it is not entitled to the rights and benefits afforded to CITY's employees, including disability or unemployment insurance, workers' compensation, retirement, CalPERS, medical insurance, sick leave, or any other employment benefit. CONTRACTOR is responsible for providing, at its own expense, disability, unemployment, workers' compensation and other insurance, training, permits, and licenses for itself and its employees and subcontractors.
11.03 CONTRACTOR hereby specifically represents and warrants to CITY that it possesses the qualifications and skills necessary to perform the Services under this Agreement in a competent, professional manner, without the advice or direction of CITY and that the Services to be rendered pursuant to this Agreement shall be performed in accordance with the standards customarily applicable to an experienced and competent professional rendering the same or similar services in the same geographic area where the CITY is located. Further, CONTRACTOR represents and warrants that the individual signing this Agreement on behalf of CONTRACTOR has the full authority to bind CONTRACTOR to this Agreement.
12. Ownership of Documents; Audit.
12.01 All draft and final reports, plans, drawings, studies, maps, photographs, specifications, data, notes, manuals, warranties and all other documents of any kind or nature prepared, developed or obtained by CONTRACTOR in connection with the performance of Services performed for the CITY shall become the sole property of CITY, and CONTRACTOR shall promptly deliver all such materials to CITY upon request. At the CITY's sole discretion, CONTRACTOR may be permitted to retain original documents, and furnish reproductions to CITY upon request, at no cost to CITY.
12.02 Subject to applicable federal and state laws, rules and regulations, CITY shall hold all intellectual property rights to any materials developed pursuant to this Agreement. CONTRACTOR shall not such use data or documents for purposes other than the performance of this Agreement, nor shall CONTRACTOR release, reproduce, distribute, publish, adapt for future use or any other purposes, or otherwise use, any data or other materials first produced in the performance of this Agreement, nor authorize others to do so, without the prior written consent of CITY.
City of Beaumont Agreement #
C24-110
12.03 CONTRACTOR shall retain and maintain, for a period not less than four years following termination of this Agreement, all-time records, accounting records and vouchers and all other records with respect to all matters concerning Services performed, compensation paid and expenses reimbursed. At any time during normal business hours and as often as CITY may deem necessary, CONTRACTOR shall make available to CITY's agents for examination all of such records and shall permit CITY's agents to audit, examine and reproduce such records.
13. Miscellaneous Provisions.
13.01 This Agreement, which includes all attached exhibits, supersedes any and all previous agreements, either oral or written, between the parties hereto with respect to the rendering of Services by CONTRACTOR for CITY and contains all of the covenants and agreements between the parties with respect to the rendering of such Services in any manner whatsoever. Any modification of this Agreement will be effective only if it is in writing signed by both parties.
13.02 CONTRACTOR shall not assign or otherwise transfer any rights or interest in this Agreement without the prior written consent of CITY. Unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under this Agreement.
13.03 CONTRACTOR shall timely file FPPC Form 700 Conflict of Interest Statements with CITY if required by California law and/or the CITY's conflict of interest policy.
13.04 If any legal action or proceeding, including an action for declaratory relief, is brought to enforce or interpret the provisions of this Agreement, the prevailing party will be entitled to reasonable attorneys' fees and costs, in addition to any other relief to which that party may be entitled.
13.05 This Agreement is made, entered into and shall be performed in the County of Riverside in the State of California and shall in all respects be interpreted, enforced and governed under the laws of the State of California. The parties agree that venue in any litigation between them shall be in Riverside County, California.
13.06 CONTRACTOR covenants that neither it nor any officer or principal of its firm has any interest, nor shall they acquire any interest, either directly or indirectly, which will conflict in any manner or degree with the performance of their Services hereunder.
CONTRACTOR further covenants that in the performance of this Agreement, no person having such interest shall be employed by it as an officer, employee, agent, or subcontractor.
13.07 CONTRACTOR has read and is aware of the provisions of Section 1090 et seq. and Section 87100 et seq. of the Government Code relating to conflicts of interest of public officers and employees. CONTRACTOR agrees that they are unaware of any financial or economic interest of any public officer or employee of the CITY relating to this Agreement. It is further understood and agreed that if such a financial interest does
City of Beaumont Agreement #
C24-110
exist at the inception of this Agreement, the CITY may immediately terminate this Agreement by giving notice thereof. CONTRACTOR shall comply with the requirements of Government Code section 87100 et seq. and section 1090 in the performance of and during the term of this Agreement.
13.08 Improper Consideration. CONTRACTOR shall not offer (either directly or through an intermediary) any improper consideration such as, but not limited to, cash, discounts, services, the provision of travel or entertainment, or any items of value to any officer, employee or agent of the CITY in an attempt to secure favorable treatment regarding this Agreement or any contract awarded by CITY. The CITY, by notice, may immediately terminate this Agreement if it determines that any improper consideration as described in the preceding sentence was offered to any officer, employee or agent of the CITY with respect to the proposal and award process of this Agreement or any CITY contract. This prohibition shall apply to any amendment, extension or evaluation process once this Agreement or any CITY contract has been awarded. CONTRACTOR shall immediately report any attempt by any CITY officer, employee or agent to solicit (either directly or through an intermediary) improper consideration from CONTRACTOR.
13.09 Severability. If any portion of this Agreement is declared invalid, illegal or otherwise unenforceable by a court of competent jurisdiction, the entire balance of this Agreement not so affected shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereby have made and executed this Agreement to be effective as of October , 2024.
CITY:
CITY OF BEAUMONT
By:
David Finn, Mayor
ATTEST:
By:
Nicole Wheelwright, Deputy City Clerk
APPROVED AS TO FORM:
By:
John O. Pinkney, City Attorney
CONTRACTOR:
Converse Consultants
By:
Print Name: Hashmi Quazi
Title: Principal -In -Charge
City of Beaumont Agreement #
C24-110
EXHIBIT "A"
PROPOSAL
(insert behind this page)
Converse Consultants
Eeorcnmc t l & Ground
ng
Environmental &Groundwater Science
Inspection & Testing Services
Presented To:
CITY OF BEAUMONT
550 East 6th Street
Beaumont, CA 92223
BEAUMONT
Presented By:
CONVERSE CONSULTANTS
2021 Rancho Drive, Suite 1
Redlands, CA 92373
CaPivuua,
September 16, 2024
Converse Consultants
Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services September 16, 2024
Mr. Kenyon Potter
Principal Engineer
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223
Subject: PROPOSAL TO PROVIDE MATERIALS TESTING SERVICES Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
Converse Project No. 24-81-263-00 (30/40)
Dear Mr. Potter:
Converse Consultants (Converse) appreciates the opportunity to submit our Proposal to provide materials testing services which will be a required during construction of the above referenced project.
In preparation of this proposal, we performed the following. • Reviewed the City of Beaumont's (City) Request for Proposal #WWMLS24-2 for Material Testing Services for the Mesa Lift Station Upgrade Project (WW -11). • Reviewed Geotechnical Investigation Report for Mesa Lift Station Upgrades provided by Converse on June 23, 2022.
• Discussed the project scope with you over the phone on September 12, 2024.
Converse understands the project involves the City building a large concrete basin for emergency storage of wastewater located at the Mesa Lift Station, 12940 Potrero Blvd., Beaumont, CA. The scope of services for the project will include the following. • Perform soil compaction testing and related services. • Perform inspection of concrete formwork and reinforcing. • Perform testing of ready -mix concrete for slump and strength by taking 6 -inch x 12 - inch diameter cylinders.
We understand the initial period of the contract is for one year, with a one-year extension as approved by the Beaumont City Council. The basin is estimated to have a construction duration of 90 days.
Our Project Director and the individual authorized to negotiate and sign a contract on behalf of Converse is Hashmi Quazi. He is a registered civil and geotechnical engineer with over 37 years of experience in Southern California. His contact information is provided in the required information shown below.
2021 Rancho Drive, Suite 1, Redlands CA 92373
Telephone: (909) 796-0544 ♦ FaPcs ii$:1 7®t-i 724 www.converseconsultants.com
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Hashmi Quazi, PhD, PE, GE, Principal -In -Charge 1 Project Director 2021 Rancho Drive, Suite 1
Redlands, California 92373
Office: 909-474-2847 1 Cell: 951-264-3286 1 Email: [email protected] Converse is proposing and will perform all services under this RFP. We will provide quality assurance services related to soils inspection and compaction and specialty inspection of concrete, etc. Our services will be provided in accordance with project contract documents and applicable ICC, CBC, ASTM, ACI, AASHTO and AWS standards, codes, city ordinances, etc.
We have over 35 professional and technical staff, available to service your projects, including in-house State of California licensed geotechnical engineers, engineering geologists, environmental scientists, special inspectors, laboratory and field technicians, drafting/CAD specialists, and other support personnel specialized in their respective fields.
Our laboratory in our Redlands office can perform geotechnical materials tests that will be required for your projects. In addition, we have full -service laboratories in our Monrovia and Palm Desert offices who can perform all required testing. These laboratories are approved by various certifying agencies, including California Department of Transportation (Caltrans), Division of the State Architect (DSA), Concrete and Cement Reference Laboratory (CCRL) and American Association of State Highway and Transportation Offices (AASHTO). They are supervised by a registered civil engineer to ensure quality control and are available 24 hours a day.
Converse will:
• Have a licensed civil/geotechnical engineer in responsible charge of all work as directed which may include quality assurance of field and laboratory work, certifying materials test result, both laboratory and field comply with project specifications, reports of investigation or construction summaries, providing recommendations. • Provide field and laboratory technicians with certification issued by ACI, ICC, NICET, Caltrans and/or AASHTO to perform the respective field observations, sampling and test methods utilized.
• Converse's DIR No. is 100001465 with an expiration date of 06/30/2026.
We have reviewed and understand all elements of the RFP. Converse is willing to enter into a contract as described in the Professional Services Agreement of the RFP.
Please feel free to contact Dr. Quazi, an officer authorized to sign and bind this proposal at 909-474-2847 if you have any questions or wish to discuss this proposal in detail. We appreciate the opportunity to be of service to City of Beaumont.
CONVERSE CONSULTANTS
Hashmi Quazi, PhD, PE, GE
Principal -In -Charge / Project Director
G►� Converse Consultants M:\JOBFILE\2024\81\24-81-263 City of Beaumcpp , ,Q a Lift a5,0 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
B. INTRODUCTION / INFORMATION
Our Project Director and the individual authorized to negotiate and sign a contract on behalf of Converse is Hashmi Quazi. He is a registered civil and geotechnical engineer with over 37 years of experience in Southern California. His contact information is provided in the required information shown below.
Hashmi Quazi, PhD, PE, GE, Principal -In -Charge 1 Project Director 2021 Rancho Drive, Suite 1
Redlands, California 92373
Office: 909-474-2847 1 Cell: 951-264-3286 1 Email: [email protected] Converse understands the City's needs for the Mesa Lift Station Upgrade Project and are able to provide the services required.
Project Understanding
Converse understands the project involves the City building a large concrete basin for emergency storage of wastewater located at the Mesa Lift Station, 12940 Potrero Blvd., Beaumont, CA. The scope of services for the project will include the following. • Perform soil compaction testing and related services. • Perform inspection of concrete formwork and reinforcing. • Perform testing of ready -mix concrete for slump and strength by taking 6 -inch x 12 - inch diameter cylinders.
We understand the initial period of the contract is for one year, with a one-year extension as approved by the Beaumont City Council. The basin is estimated to have a construction duration of 90 days.
Accomplish Scope of Services
Converse has the personnel and ability to accomplish the scope of services for this RFP.
Below is a description of the quality control, budget control and ability to meet project schedules.
Techniques for Quality Control of Project Documents
Our internal Quality Controls for project documents and Project Management procedures have been developed over several decades. We continually learn and improve from both our success and our challenges. We reinforce communication, tracking of time expenditures, and a tiered review system. For every project, our quality control starts at the inception. A technical memo is prepared by the designated project manager before the start of a project. The memo highlights our scope of work, schedule and budget. All documents are prepared under the supervision of the designated project manager. The final document is reviewed by the project principal -in -charge. Our laboratories are supervised by a registered civil engineer. All deliverables are reviewed by a Principal Professional.
Quality Control
Quality control (Q/C) includes the operation and activities necessary to make the quality of the product what it should be. QC applies to all aspects of Converse practice. This includes corporate management, field investigation procedures and practice, geotechnical analyses, G.� Converse Consultants M:\JOBFILE\2024\81\24-81-263 City of Beaum pA Ll�iSQ521roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
design, report, laboratory testing and construction inspection and testing. As part of our QC on a project, we will conduct the following.
• Match the qualifications and experience of the staff before they are assigned to the project.
• Conduct an in-house project kick-off meeting to go over the project plan and specification with our team members.
• Establish chain of command and reporting protocol among the team members. • Review daily field reports for non-compliance and corrective action. • Review laboratory test results prior to issuing to the team members.
Our engineering staff is provided with regular training sessions to review the codes and regulations by which our services are governed. These training sessions serve as refreshers for experienced staff and continuing education for younger engineers.
Our Technician Training and Competency Review Policy and Procedures require that each technician, regardless of their Converse personnel classification or outside agency certifications, will have one of the following training status classifications for each test they perform: Trained with Current Competency Verification (V), Trained with Competency Verification Holding (H), Trainee (T), or not qualified. The staff assigned to perform a test will be properly trained with current competency verification for the testing task to which they are assigned.
Converse laboratories strive to meet and exceed industry standards. Participating in sample test reference programs for soils, fine aggregates, coarse aggregates and bituminous materials, Converse's laboratories carry the certifications required by local agencies and the industry. CCRL performs periodic inspections of Converse and AMRL distributes and evaluates the results of proficiency test samples. Their inspections verify compliance of our Quality Control Manual (QMC) to the ASTM standards, verify our compliance with the policies and procedures contained in the QCM, equipment with the ASTM standard testing procedures, and our technicians in performance of tests in accordance with the standard testing procedures.
As a result of these AMRL and CCRL services and the compliance of Converse with their standards, Converse is accredited by the Cement and Concrete Reference Laboratory (CCRL), Caltrans, and the Division of the State Architect (DSA). Converse is accredited in Portland Cement Concrete, Portland Cement Concrete Aggregates, Soils, Bituminous Concrete, Bituminous Concrete Aggregates, Masonry Products, and inspection services.
Each piece of field and laboratory testing equipment is listed on an Equipment Inventory Log and assigned an equipment number. For each piece of equipment, an Equipment Calibration Record form is completed, and the calibration record maintained. The Equipment Inventory Log and Equipment Calibration Record forms are maintained in a master file located in the laboratory manager's office.
Ability to Maintain Schedules
Schedule maintenance for materials testing and inspection projects is a matter of technical expertise, availability of qualified personnel, and internal quality controls. Our field staff and Converse Consultants 77
M:\JOBFILE\2024\81\24-81-263 City of Beaumdhtpp �a Li,, f> tio pl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
contract managers understand the necessity of proceeding on schedule through construction projects. To maximize our efficiency, we typically dispatch field technicians with multiple relevant certifications. Depending on the sequencing of construction activities, one person can observe and test several items in one day on each site or between sites. In addition, our certified laboratories are available 24 hours a day, 7 days a week to accommodate fluctuations in testing needs. Typical turnaround time for lab results is 48 hours, or when due.
Budget Control
During the course of the project, our project manager will monitor the amount of work performed and budget expended on a weekly basis. He will update the budget tracking sheet and keep the City's representative informed of the budget status. The project manager will identify the disposition of any requests for work that falls outside of our initial scope of work and budget. He will seek the City's representative before providing the services. If more testing is requested than initially planned or if the contractor is behind in his schedule, we will meet with the City's representative to discuss how we can be modified our scope to meet the budget.
Ability to Provide Superior Service and Multiple Project Coordination Our staff consists of roughly 50 technical personnel between our 3 Southern California offices. We are able to staff large multi -phased projects with the right people for each task. Whenever possible, we will assign field technicians who can perform multiple tests in one site visit. Our project managers and field service coordinator be available to our clients at extended hours for urgent dispatch requests and consultations.
Administrative
Converse administrative staff include office billing personnel and project professionals.
The billing personnel follow the guidelines in the contract with regard to the format of the invoice and date due. Each invoice is supported by daily field reports, which indicate the work performed, associated test results, and time charged. These daily reports are signed by the City's approved field representatives. These procedures reduce the potential for disputes related to our administrative staff services.
Our project professionals will include the individuals who are listed in this proposal. Their charges will include time for preparing and reviewing reports, attending meetings at your request, and providing as -needed consultation.
Firm Contact Information
Converse Consultants
Hashmi Quazi, PhD, PE, GE, Principal -In -Charge 1 Project Director 2021 Rancho Drive, Suite 1, Redlands, California 92373
Office: 909-474-2847 1 Cell: 951-264-3286 1 Email: [email protected] Sub -Consultants
Converse can provide all materials testing services required for this project so we will not use the services of any sub -consultants.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g dit pl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
C. APPROACH
Our designated Project Manager, Jim Cunneen, will be the single point of contact with the City of Beaumont staff, officials and the public to facilitate successful delivery of the assigned tests. Before the project starts Mr. Cunneen will prepare 2 memos.
The first memo will list the contact information and their role on the project. This will be issued to the City, so they can reach out to the right individual depending on the needs and situation.
The second memo will list the technical requirements of the project for our internal staff use.
These two processes have helped us in delivering a project within schedule and budget.
G►� Converse Consultants p
M:\JOBFILE\2024\81\24-81-263 City of Beau mo t, g L1f� 4 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
D. FIRM PROFILE
Converse was established in 1946 to provide professional services in the fields of geotechnical engineering, engineering geology, groundwater sciences, environmental sciences, and soil and materials testing and inspection.
Number of Personnel: 170 nationwide
Years in Business: 78
Organizational Structure: Corporation
We are an employee -owned corporation, with 9 offices and more than 170 employees throughout the United States — California (Monrovia, Redlands, Costa Mesa, Palm Desert and Palmdale), Nevada (Las Vegas, Reno, and Elko), and Pennsylvania.
Converse Consultants (Converse) has the relevant qualifications and experience working on similar projects throughout Southern California. Our staff is familiar with the guidelines for inspection and testing of construction material. They possess the required registration/certification to render services related to their expertise. Because of our large pool of in-house staff, we can service multiple projects and still comply with your schedule.
We have an in-house laboratory within our Redlands office, and we have similar facilities in our Monrovia and Palm Desert offices. Our laboratories are certified by Caltrans and the Division of State Architects (DSA). We participate in the AMRL, CCRL and Caltrans proficiency samples testing program, which enable us to maintain the quality of our laboratory testing. A registered civil engineer supervises each lab to ensure all our equipment is calibrated regularly, and quality control is available 24/7. Whatever the challenge, Converse can meet all your geotechnical and materials testing needs.
Types of Services Offered
Our clients include public agencies and the private sector in the fields of transportation, water/wastewater, educational, residential, commercial, industrial, health care and other market segments. Our services include the following.
• Geotechnical Engineering
• Shallow and Deep Foundation Design
• Geology and Fault Study
• Seismic Analysis
• Special Inspections During Construction
• Laboratory Testing of Soils & Construction Materials
• QA/QC During Grading & Post Grading
• Environmental & Hazardous Materials
• Occupational & Environmental Health & Safety
• Groundwater Resources
• Design and QA/QC Monitoring of Landfills
G►� Converse Consultants pp �
M:\JOBFILE\2024\81\24-81-263 City of Beau mo t, �a dit4n p roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
E. LOCATION
Converse's principal office location that will be responsible for the implementation of this project is as follows.
2021 Rancho Drive, Suite 1
Redlands, California 92373
G►� Converse Consultants pp ��
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, �a dit^^ 10 4f aroposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
F. ORGANIZATION, KEY PERSONNEL AND RESUMES
Our organization chart, staff matrix and key personnel resumes are shown below.
Organization Chart
Our project team is illustrated in the Organization Chart below. Depending on your project needs, we will select individuals who can provide the most technically sound and cost- effective solution. Our Project Director is Hashmi Quazi, PhD, PE, GE and our Project Manager is Jim Cunneen, JC, PE.
BEAUMONT
Engineers & Geologists
Robert Gregorek, MS, PG,
CEG
Siva Sivathasan, PhD, PE,
GE, DGE, QSD, F.ASCE
Babak Abbasi, PhD, PE
Aleksey Zhukov, BS
Catherine Nelson, BS, GIT
Stephen McPherson, BS, GIT
Principal -in -Charge/
Project Director
Hashmi S. Quazi, PhD, PE, GE
L
Field Services Director/
Project Manager
Jim Cunneen, JD, PE
Field Services Coordinator
Penney Munns
Laboratory
Jita Smith
Travell Landrum
Christian Quintero
1 Field Technicians
Bill Kowalski
Diego Garcia
Brian Kauffman
Randy White
Sean Castillo
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g Llft1 p45aroposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Staff Matrix
Converse has a large pool of staff with the qualifications and experience that we will draw from depending on the project demands. The following table identifies our principal and support staff along with their duties, licenses/certifications and years of experience.
Name
Duties for Projects
Licenses/Certifications
37 ENGINEERS / GEOLOGISTS
Hashmi Quazi
PIC/Project Director
Jim Cunneen
FSD/Project Manager
Siva Sivathasan
Principal Engineer
PhD, PE, GE
JD, PE
PhD., PE, GE, DGE, QSD, F.ASCE
Robert Gregorek
Senior Geologist
MS, PG, CEG
36 30
44 ENGINEERS / GEOLOGISTS
Babak Abbasi
Project Engineer
Catherine Nelson
PhD, PE
Project Geologist
Aleksey Zhukov
Staff Engineer
BS, GIT
8 5
BS, Caltrans 105, 125, 201, 202, 205, 216,
217, 226
6 FIELD TECHNICIANS
Bill Kowalski Lead Field Technician
Diego Garcia Field Technician
Brian Kauffman Field Technician
Randy White Field Technician
Sean Castillo
Caltrans 125, 231, 504, 518, 539, 540, 543,
556, 557, ACI Grade 1, Nuclear Gauge
Caltrans 125, 504, 518, 539, 540, 556, 557,
ACI Grade I, Nuclear Gauge
Caltrans 504, 518, 539, 540, 557, ACI Grade
I, Nuclear Gauge
Caltrans 125, 231, 504, 518, 523, 539, 540,
556, 557, Nuclear Gauge
Field Technician
Caltrans 216, 231, Nuclear Gauge, ACI
21 14
21 23
16 LABORATORY STAFF
Jita Smith
Travel) Landrum
Christian Quintero
Lab Supervisor
Lab Technician
Lab Technician
Caltrans 105, 125 AGG, 201, 202, 205, 216,
217, 226, 227, 229
Nuclear Gauge, ACI Grade I, Caltrans 125,
504, 518, 523, 539, 540, 543, 556, 557
Nuclear Gauge, ACI Grade I, Caltrans 231,
504, 518, 539, 540, 543, 556, 557
6 5
8 G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beau mo t, g Llftl gdpl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
The primary contacts who will be responsible for communication with the City staff, officials and the public to facilitate successful delivery of the assigned tasks are shown below and have prior experience working on similar projects. They have teamed with owner Hashmi Quazi, PhD, PE, GE, Principal in Charge/Project Manager, has over 37 years of experience providing geotechnical and materials testing services. He will be the City's point - of -contact on contract matters and the overall services offered. He will be available for the duration of the contract and his duties will include the following. • Quality Assurance/Quality Control (QA/QC) for all Converse activities. • Technical assistance and oversight.
• Contract and budget negotiations.
• Report review.
• Attending project meetings as needed.
Jim Cunneen, JD, PE, Field Services Director / Project Manager has over 36 years of experience in geotechnical observation and testing and materials testing projects. He will be the point of contact for all field services. His duties for this project will include the following. • Attend project kick-off meeting and all as -needed progress meetings • Assign personnel to projects on an as -needed basis in coordination with your representatives
• Work with Field Services Coordinator and Lead Technician to forecast man-hours. • Supervision of field activities and laboratory testing for projects in construction phase involving materials testing services
• Verify/approve all lab test results before issuing to the project team • Review all field daily reports to verify compliance with the project plan and specification and prepare interim reports on project progress • Oversee our staff to ensure our services are on schedule and within budget • Assure that all deliverables are submitted on time
• Review, monitor, and provide general direction for our laboratory and field personnel • Review and issue reports and invoices for submittal
• Consultation and attend as -needed project progress meetings Key Personnel Resumes
The key personnel assigned to your project have direct experience providing services for the types of projects described in the RFP. Their resumes are provided on the following pages. Additional resumes will be provided upon request.
G►� Converse Consultants pp �
M:\JOBFILE\2024\81\24-81-263 City of Beau mo t, �a dfl^ Ib 4 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Hashmi Quazi, PhD, PE, GE
Principal -in -Charge / Project Director
Dr. Quazi has over 37 years of experience providing
geotechnical engineering services and has earned a
reputation for providing quality work in an honest and ethical manner, on time and within budget. Dr. Quazi provides
quality control, budget oversight, and technical assistance on project types including lift stations, pump stations, pipelines, water treatment plants, reservoirs and other related studies.
Relevant Experience
EDUCATION
• Ph.D., Civil Engineering, University of
Arizona, 1987
• M.S., Civil Engineering, Arizona State
University, 1982
• B.S., Bangladesh Engineering
University, 1978
REGISTRATIONS/CERTIFICATIONS
• California, Civil Engineer, #46651
• California, Geotechnical Engineer,
#2517
River Road Lift Station Expansion, Jurupa Valley, CA. Principal in Charge. Provided technical oversight and budget allocation for the construction phase of the project. The River Road Lift Station located in Jurupa Valley, California expansion consisted of conduit and utility trenching as well as pavement repairs at various locations.
Van Buren Blvd. Lift Station, Riverside, CA. Principal in Charge. Provided technical oversight and budget allocation for the construction phase of the project. The Jurupa Community Services District project consisted grading modifications of vaults at lift station site and all associated work, trenching and backfilling of conduits on site between lift station and genset, approximately 69 linear feet of 8 inch PVC force main at Van Buren Blvd. and Clay Street, and excavation and demolition of existing valve vault.
Ahwahnee Lift Station, San Bernardino County, CA. Principal in Charge. Provided technical oversight and budget control during the design and construction phases. The project included installation of two 10' x 40' x 8' pre -cast concrete tanks and some miscellaneous piping, valving, and manholes construction. The concrete tanks were located about five (5) feet from the existing lift station which is approximately 17' x 20' in the plan area.
Murrieta Road Pump Station, Perris, CA. Principal in Charge. Provided technical oversight and budget control during the construction phase. The project consisted of a new booster station and related pipelines which were designed and constructed at a new location to replace the existing Murrieta Road Booster Pump Station. The booster station was a 100' x 50' masonry block wall building with a reinforced concrete floor slab supported by spread footings.
Buford Booster Pump Station, Wrightwood, CA. Principal in Charge. Provided technical oversight and budget allocation for the construction phase of the project. The project consisted of the construction of a new concrete block CMU booster pump/chemical building and 2 new generator pads at a water treatment plant.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beau mdht, g dit1 4 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Jim Cunneen, JD, PE
Director of Field Services / Project Manager
Mr. Cunneen has 36 years of experience of experience
performing geotechnical investigations, environmental due diligence / compliance, and construction materials testing for a wide range of major earthwork and constructions projects such as bridges, roadways, pipelines, and other related project types.
Relevant Experience
EDUCATION
• Juris Doctor, American College of
Law, Anaheim, California 2007
• BS, Civil Engineering, California
State University, Long Beach 1990
REGISTRATIONS
• Civil Engineer, California No. 59444
• Registered Environmental Assessor
I, California No. 06320 (Program
Ceased)
• ASTM Training for Phase I ESAs
Linda Vista Reservoir and Pump Station Replacement,
Anaheim, California. Project Manager. Managed material
testing, inspection and prepared reports for the construction phase of the project. The 5.3 - acre site was composed of two parcels. The reservoir is one of the City of Anaheim's 13 water supply reservoirs and a critical component in the City's potable water supply system as it serves both the "flatland" and hill and canyon areas of the city. Site preparation work included overexcavation and re -compaction per report recommendations. Group Delta performed the compaction / field density testing to verify compliance with the project specifications and all construction materials testing, such as concrete and reinforcing steel.
Westminster Water Storage Tank, Westminster, California. Project Manager. Managed material testing, inspection and prepared reports for the construction phase of the project.
The project involved replacing a failed water tank that caused extensive damage. This project was performed on a fast -track basis to allow a rapid reconstruction schedule for the city.
Cucamonga Valley Water District Lloyd W. Michael Water Treatment Plan, Materials Testing & Inspection, Rancho Cucamonga, California. Project Manager. Managed material testing, inspection and prepared reports for the construction phase of the project.
The $40M project brought new storage capacity and two new water -quality improvement processes to the facility. The District constructed a new 30 MGD pump station, a new 6 MG water storage reservoir, new water treatment facilities and other appurtenant facilities. The project required 3 years to complete and allowed the CVWD to meet federal requirements from the Environmental Protection Agency.
Francis Street Storm Drain Project Ontario, California. Project Manager. Managed material testing, inspection and prepared reports for the construction phase of the project.
The project consisted of construction of 7,500 linear feet of 18" to 120" RCP connecting to the West Cucamonga Creek Channel. Project included the construction of storm drain improvements, catch basins, reinforced concrete box, water line, the construction of street improvements, pavement removals, construction of curb and gutter, cross gutter, sidewalk, curb ramps, PCC pavement, and asphalt concrete paving. Field Technicians performed field compaction testing of storm drain trench backfill, waterline trench backfill, prepared sub grade material, Class II aggregate base rock, and asphalt concrete using properly calibrated Nuclear Gauges in accordance with ASTM D-2922.
G►� Converse Consultants ��
M:\JOBFILE\2024\81\24-81-263 City of Beaumdhtpp �a Li,, ft^^go pl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Bill Kowalski
Lead Technician
Mr. Kowalski has over 21 years of experience working as a field technician. He has performed field testing for various public works and private construction projects, including lift stations, pump stations, water pipeline, sewer pipeline, water treatment facilities, reservoirs and other related water projects.
Relevant Experience
Van Buren Lift Station, Riverside, CA. Field Technician.
Performed observation, field density testing and inspection services. The Jurupa Community Services District project consisted grading modifications of vaults at lift station site and all associated work, trenching and backfilling of conduits on site between lift station and genset, approximately 69 linear feet of 8 inch PVC force main at Van Buren Blvd. and Clay Street, and excavation and demolition of existing valve vault.
CERTIFICATIONS/REGISTRATIONS
• ACI Certified Field Technician
Grade I
• Nuclear Gauge Certification
• Caltrans 125- Sampling Highway,
Materials & Products
• Caltrans 231- Relative Compaction,
Soils & Aggregates (Nuclear)
• Caltrans 504- Air Content, Freshly
Mixed Concrete, Pressure
• Caltrans 518- Density of Fresh
Concrete
• Caltrans 539- Sampling Freshly
Mixed Concrete
• Caltrans 540- PCC Cylinder
Fabrication
• Caltrans 543 - Air Content of
Freshly Mixed Concrete
• Caltrans 556- Slump of Fresh
Portland Cement Concrete
• Caltrans 557- Temperature of
Freshly Mixed Portland Cement
Concrete
Wildomar Lift Station, Wildomar Area, Riverside County, CA. Field Technician. Performed in -place density testing of compacted trench backfill. The project consisted of the construction of Wildomar Area Lift Station which consisted of approximately 1,300 linear feet of 8 -inch parallel sewer line, 1,200 linear feet of 14 -inch force main, pump and electrical upgrades to the B1 and B2 lift station facilities.
Murrieta Road Pump Station, Perris, CA. Field Technician. Performed observation, field density testing and inspection services. The project consisted of a new booster station and related pipelines which were designed and constructed at a new location to replace the existing Murrieta Road Booster Pump Station. The booster station was a 100' x 50' masonry block wall building with a reinforced concrete floor slab supported by spread footings.
2.5 MG Tank & Pump Station, Hesperia, CA. Field Technician. Performed compaction testing and concrete sampling and testing. The project consisted of the design and construction of a 2.5 -million -gallon water tank, pump station, and associated pipelines and appurtenances located at 13500 Live Oak Street, Hesperia, CA. The proposed water tank diameter was 115 feet with a height of 30 feet and was constructed at -grade with a 4 -foot - wide by 2.5 -foot -deep ring wall foundation. A second future water tank is proposed with a footprint of 25 feet by 50 feet. The building was a one-story masonry block wall structure founded on shallow footings with a slab -on -grade.
G►� Converse Consultants pp �e L� M:\JOBFILE\2024\81\24-81-263 City of Beaumoht, f ti77 o pl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Diego Garcia
Field Technician
Mr. Garcia has 14 years of experience providing field
observation and laboratory testing services. He is responsible for providing nuclear gauge density testing and field density testing of soils on various projects. He is also experienced working on a variety of projects such as street improvement, water pipelines, sewer pipelines, essential buildings and other types of project work.
Relevant Experience
River Road Lift Station Expansion, Jurupa Valley, CA. Field Technician. Performed observation and field testing for the project. The River Road Lift Station located in Jurupa Valley, California expansion consisted of conduit and utility trenching as well as pavement repairs at various locations.
Van Buren Blvd. Lift Station, Riverside, CA. Field
Technician. Performed observation and field testing for the project. The Jurupa Community Services District project consisted grading modifications of vaults at lift station site and all associated work, trenching and backfilling of conduits on site between lift station and genset, approximately 69 linear feet of 8 inch PVC force main at Van Buren Blvd. and Clay Street, and excavation and demolition of existing valve vault.
REGISTRATIONS/CERTIFICATIONS
• ACI Concrete Field Testing — Grade
• Nuclear Gauge Certification
• Caltrans 125- Sampling Highway,
Materials & Products
• Caltrans 231 — Compaction of Soils
& Aggregates
• Caltrans 504- Air Content, Freshly
Mixed Concrete, Pressure
• Caltrans 518- Density of Fresh
Concrete
• Caltrans 523- Method of Test for
Flexural Strength of Concrete
• Caltrans 533- Ball Penetration in
Fresh Portland Cement Concrete
• Caltrans 539- Sampling Freshly
Mixed Concrete
• Caltrans 540- PCC Cylinder
Fabrication
• Caltrans 543 - Air Content of
Freshly Mixed Concrete
• Caltrans 556- Slump of Fresh
Portland Cement Concrete
• Caltrans 557- Temperature of
Freshly Mixed Portland Cement
Concrete
Ahwahnee Lift Station, San Bernardino County, CA. Field Technician. Performed observation and field testing for the project. The project included installation of two 10' x 40' x 8' pre -cast concrete tanks and some miscellaneous piping, valving, and manholes construction. The concrete tanks were located about five (5) feet from the existing lift station which is approximately 17' x 20' in the plan area.
Murrieta Road Pump Station, Perris, CA Field Technician. Performed observation and field testing for the project. The project consisted of a new booster station and related pipelines which were designed and constructed at a new location to replace the existing Murrieta Road Booster Pump Station. The booster station was a 100' x 50' masonry block wall building with a reinforced concrete floor slab supported by spread footings.
Buford Booster Pump Station, Wrightwood, CA. Field Technician. Performed observation and field testing for the project. The project consisted of the construction of a new concrete block CMU booster pump/chemical building and 2 new generator pads at a water treatment plant.
G►� Converse Consultants pp �� Q
M:\JOBFILE\2024\81\24-81-263 City of Beaumdht, �a dit114141 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
G. PROJECT EXPERIENCE
Converse has provided geotechnical material testing services for lift and pump stations throughout southern for decades. Below is a list of projects for which we have provided these services and on the following pages are detailed project experience for which we provided services in the last 5 years.
• River Road Lift Station
• Diamond Regional Lift Station
• Ahwahnee Lift Station
• Bogert Trail Sewer Lift Station
• Van Buren Lift Station
• Diaz Road Lift Station
• Jurupa Comm. Service District Lift Station
• Stoney Mountain Lift Station
• Pilgram Creek Lift Station
• Murrieta Road Booster Pump Station
• Vactor Pump Station
• Steeplechase Booster Pump Station
• Kalmia Booster Pump Station
• Carancho Pump Station
• Buford Plant Pump Station
• EM -11 Pump Station
• IEUA Pump Stations
• Romoland Pump Station
• Euclid Ave. Pump Station
• Cactus Ave. Pump Station
• Marywood Pump Station
• Cannon Pump Station & Pipeline
• Simpson Pump Station
• Tenaja Pump Station
• North Bay Intake Pump Station
• Whitegates Pump Station
G►� Converse Consultants pp �
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, �a dfl4Q 4:4 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
River Road Lift Station
PROJECT LOCATION
Jurupa Valley, CA
OWNER / CLIENT
Jurupa Community Services District
c/o Albert A. Webb Associates
3788 McCray Street
Riverside, CA 92506
Sinnaro Yos
951-320-6033
PROJECT TEAM
Hashmi Quazi, Principal -In -Charge
Diego Garcia, Field Technician
RESPONSIBILITIES
Geotechnical Observation and Material Testing and Inspection
PROJECT DURATION
September 2020 — December 2020
PROJECT DESCRIPTION
The project included the expansion of the River Road Lift Station located in Jurupa Valley, California. It consisted of conduit and utility trenching as well as pavement repairs at various locations.
SCOPE OF WORK DURING CONSTRUCTION
• Provided as needed in -place density tests of compacted trench backfill. • Verified quality of fresh concrete and collected concrete cylinders. • Provided laboratory testing which included Modifed Proctor, compressive strength concrete cylinders, extraction and gradation of asphalt mix and Hveem density testing. • Reviewed and analyzed the data from field and laboratory testing. • Prepared a report to document the findings and conclusions developed during the field and laboratory activities.
G►� Converse Consultants pp ��
M:\JOBFILE\2024\81\24-81-263 City of Beau mo t, �a ditS#n p roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Pilgram Creek Lift Station
PROJECT LOCATION
Oceanside, CA
OWNER / CLIENT
City of Oceanside
Z&K Consultants, Inc.
17130 Van Buren Blvd., 122
Riverside, California 92504
Mina Henin
951-310-7470
PROJECT TEAM
Hashmi Quazi, Principal -in -Charge
Sean Castillo, Field Technician
Bill Kowalski, Field Technician
Travell Landrum, Field Technician
RESPONSIBILITIES
Material Testing Services
PROJECT DURATION
August 2022 — July 2023
PROJECT DESCRIPTION
The project consisted of approximately 6,500 square feet of improvements to the existing sewer lift station along the north side of Douglas Drive in Oceanside, California.
SCOPE OF WORK DURING CONSTRUCTION
• Attended pre -construction meeting (Converse project manager and field technician). • Reviewed plans and specifications provided by the client. • Conducted testing of compaction of subgrade soil at the southwest corner of the sewer lift station pad.
• Excavated to 12.0 feet below grade surface.
• Reviewed recommendations for the wet well and valve vault given by Construction Testing and Engineering during exploration.
• Prepared a Subgrade Bottom Stabilization Report and submitted it to the client for their use.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g df logdp1 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Murrieta Road Pump Station
PROJECT LOCATION
Perris, CA
OWNER / CLIENT
Eastern Municipal Water District
2270 Trumble Road
Perris, CA 92572-8300
Greg Kowalski
951-928-3777, ext 4466
PROJECT TEAM
Hashmi Quazi, Principal in Charge
Catherine Nelson, Project Geologist
Bill Kowalski, Field Technician
Sean Castillo, Field Technician
Diego Garcia, Field Technician
RESPONSIBILITIES
Geotechnical Observation, Materials Testing & Inspection
PROJECT DURATION
May 2024 — On -going
c`.a Rd. I- L rlc ;..`.aticr
PROJECT DESCRIPTION
The project consisted of a new booster station and related pipelines which were designed and constructed at a new location to replace the existing Murrieta Road Booster Pump Station. The booster station was a 100' x 50' masonry block wall building with a reinforced concrete floor slab supported by spread footings.
SCOPE OF WORK DURING CONSTRUCTION
• Attended kick off meeting and other required meetings. • Provided full-time observation during site grading and take in -place density tests of compacted fill at the new site.
• Conducted full-time observation during placement of compacted backfill at the excavation after demolition of the old pump station.
• Performed in -place density test of the compacted fill. • Conducted inspection of pipe trench bottom and bedding, slab/foundation bottoms. • Provided compaction testing for pavement subgrade, base material and AC pavement. • Performed modified proctor, sieve analysis, sand equivalent, expansion index, soils corrosivity and Hveem test on asphalt concrete.
• Provided project management and consultation when needed. • Prepared and distributed to the client a grading report summarizing all observations and test results.
G►� Converse Consultants M:\JOBFILE\2024\81\24-81-263 City of Beau mcpp , ,Q df a p15aroposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Buford Plant Pump Station
PROJECT LOCATION
Wrightwood, CA
OWNER / CLIENT
Golden State Water Company
160 East Via Verde, Suite 100
San Dimas, CA 91773
Dennis Ambayec
818-476-2515
PROJECT TEAM
Hashmi Quazi, Principal -In -Charge
Robert Gregorek, Senior Geologist
Diego Garcia, Field Technician
RESPONSIBILITIES
Geotechnical Observation and Material Testing and Inspection
PROJECT DURATION
September 2020 to February 2021
PROJECT DESCRIPTION
The project consisted of the construction of a new concrete block CMU booster pump/chemical building and 2 new generator pads at a water treatment plant.
SCOPE OF WORK DURING CONSTRUCTION
• Provided as needed soil compaction testing in accordance with the ASTM Standard D1556 (Sand Cone Method) or the ASTM D6938 (Nuclear Method). • Conducted as needed concrete sampling and making concrete cylinders. • Provided laboratory testing of maximum dry density and optimum moisture contents on soils and compressive strength testing of concrete cylinders. • Performed rebar and forms inspection, concrete and CMU wall installation. • Provided project management during the construction phase of the project at each site.
• Reviewed and analyzed the data from field and laboratory testing. • Prepared a report to document the findings and conclusions developed during the field and laboratory activities.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g Llft 40 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
H. REFERENCES
Our mission is to work together with our clients to provide responsive and quality services, resulting in the development of long-term relationships. The successful completion of any project involves the total satisfaction of the client. Our clients will attest to the quality and cost-effectiveness of our services. Below is a list of references including organization, contact name, title, address, telephone number and description of services provided.
Client Reference and Information
Description of Services
Greg Kowalski
Principal Engineer
Eastern Municipal Water District
2270 Trumble Road
Perris, CA 92572-8300
951-928-3777, ext. 4466
Scott Lynch
Principal Engineer
Jurupa Community Services District
11201 Harrel Street
Mira Loma, CA 91752
951-685-7434
Omar Gonzalez
Project Engineer
Ontario Municipal Utilities Company
1425 South Bon View Ave.
Ontario, CA 91761
909-395-2578
Converse has teamed with the Eastern Municipal
Water District for over 2 decades to provide
geotechnical observation, materials testing and
inspection services on lift stations, pump stations,
water treatment, pipeline, reservoirs and other
water related projects.
Converse has teamed with the Jurupa Community
Services District for over a decade to provide
geotechnical observation, materials testing and
inspection services on lift stations, pump stations,
pipeline, reservoirs and other water related
projects.
Converse has teamed with the Ontario Municipal
Utilities Company for over 2 decades to provide
geotechnical observation, materials testing and
inspection services on lift stations, pump stations,
pipeline, reservoirs and other water related
projects.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g dit Agdpl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
I. SCOPE OF SERVICES
Converse has decades of experience providing geotechnical material testing services throughout southern California for lift station and pump station projects. We understand the City will need material testing services for the Mesa Lift Station Upgrade. The scope of services we will provide includes the following.
Soil Compaction Testing
• Review soils report, project plans and specifications. • Review submitted on -site and/or imported materials to determine their suitability as fill materials.
• Inspect bottom of excavations.
• Perform in -place density tests according to ASTM
D1556 (sand cone method). Soil density tests may also
be performed by nuclear method according to ASTM
D6938 and adjusted to ASTM D1556 provided
calibration curves are periodically checked.
• Provide fill placement inspection and testing during
construction of structure foundations and backfill of
utility trenches on an intermittent and continuous basis as required to establish proper execution and conformance with the specifications.
This includes testing (e.g., field density tests) on -site soil for subgrades to receive fill, fill placement, parking areas, walkways, and subgrade.
• Review and provide laboratory testing on soil, backfill materials, aggregate base, etc.
Develop compaction curves for materials encountered. Monitor excavation and stockpiling of suitable fill materials from mass excavation, existing aggregate base, and the crushing of existing soils for use as fills.
• Prepare reports summarizing all observations and test results. • Provide soils testing including but not limited to: Maximum Dry Density, Sand Equivalent, Expansion Index, and sampling.
• Prepare reports summarizing all observations and test results.
Concrete
• Review concrete mix designs, product mill certificates for compliance. • Perform batch plant inspection for design compliance. • Review each batch ticket, inspect concrete placement, and test concrete slump.
• Provide a minimum of one test for each type of cement and aggregate for conformance to the working drawings and
specifications for mix designs.
• Verify concrete meets the specified strength and in required areas of locations.
• Fabricate and pick-up concrete cylinders.
• Test concrete for compressive strength. Test one cylinder for 7 days and two at 28 days; retain one cylinder for possible test at 56 days.
• Monitor concrete tests results and advise for non -conforming tests.
Converse Consultants M:\JOBFILE\2024\81\24-81-263 City of Beaumdhtpp ,,a Lift A41 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
• Perform anchor pull tests.
• Prepare reports summarizing all observations and test results.
Laboratory Testing
Laboratory tests will include the following.
• Maximum dry -density and optimum moisture contents on soils and aggregate base. • Compressive strength tests of concrete cylinders.
Compaction Report
At the completion of each day's work, we will submit a daily report which will include the following.
• Observation made during compacted fill placement (if provided) • Test number
• Location by station
• Approximate elevation
• Approximate material depth
• Dry density
• Percent moisture content
• Percent compaction
• Method used
• Remarks
Also, all failed tests and retests will be reported in the same table.
We will certify all compaction tests as specified in the contract documents if we provide full- time observation and testing. Otherwise, our report will be for test results only. We cannot certify areas we have not observed and tested.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beau mo t, g dit aQApl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
J. COST PROPOSAL
Converse's Cost Proposal is provided in a separate document per the instructions of the RFP.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g df ti77 4 roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
K. ADDITIONAL INFORMATION
Converse's does not have any additional information to provide.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g dit pl roposal\24-81-263_pro(30)Beaumont-liftstation
Proposal To Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
L. INSURANCE / CERTIFICATION
Converse will provide the required insurance certification to the City when/ if we are chosen to enter into a contract for the services noted in the RFP.
G►� Converse Consultants pp
M:\JOBFILE\2024\81\24-81-263 City of Beaumo t, g Llft a pl roposal\24-81-263_pro(30)Beaumont-liftstation
Converse Consultants
Eeorcnmc t l & Ground
ng
Environmental &Groundwater Science
Inspection & Testing Services
Presented To:
CITY OF BEAUMONT
550 East 6th Street
Beaumont, CA 92223
BEAUMONT
Presented By:
CONVERSE CONSULTANTS
2021 Rancho Drive, Suite 1
Redlands, CA 92373
CaPivuua,
September 16, 2024
Converse Consultants
Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services September 16, 2024
Mr. Kenyon Potter
Principal Engineer
City of Beaumont
550 E. 6th Street
Beaumont, CA 92223
Subject: COST PROPOSAL TO PROVIDE MATERIALS TESTING SERVICES Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
Converse Project No. 24-81-263-00 (30/40)
Dear Mr. Potter:
Converse Consultants (Converse) appreciates the opportunity to submit our Cost Proposal in response to the City of Beaumont's (City) Request for Proposal #WWMLS24- 2 for Material Testing Services for the Mesa Lift Station Upgrade Project (WW -11).
Our cost for the project is provided below.
Field Services Costs
Service Type
Unit
Total
Units
Unit
Rate
Cost
Field Technician to take in place density and
moisture tests of compacted soil (10 working
days @ 4 hrs./day)
Field Technician to take test of fresh concrete
and make concrete cylinder samples (2 days @
8 hrs./day
Rebar Inspection (4 hrs./week for 10 weeks)
Hr.
Hr.
40 16
$150.00 $6,000.00
$150.00 $2,400.00
Hr.
40 $150.00
$6,000.00
Sample pick-up
Hr.
8 $65.00
Field Services Cost Total
•
Laboratory Testing Costs
$520.00
$14,920.00
Type of Tests
Number
of Tests
Cost Per
Test
Total Cost
Modified proctor for optimum moisture and density (soils) 2 $190.00
$380.00
Concrete Cylinder compression testing
Laboratory Testing Cost Total
8 $45.00
$360.00
$740.00
2021 Rancho Drive, Suite 1, Redlands, CA 92373
Telephone: (909) 796-0544 ♦ Facsimile: (909) 796-7675 ♦ www.converseconsultants.com
Cost Proposal to Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
Office Support Costs
T • e of Activity
Unit
Total
Units
Unit Rate
Total Cost
Office Support
Project Professional
Hr.
4 $80.00
$320.00
Hr.
2 $155.00
$310.00
QC by a Principal Engineer
Hr.
1 $220.00
$220.00
Close-out report
Lump
Sum
1 $1,000.00
Office Support Cost Total
Cost Summary
$1,000.00
$1,850.00
Item
Cost
Field Services Costs
Laboratory Testing Costs
Office Support Costs
$14,920.00
$740.00
TOTAL
$1,850.00
$17,510.00
In general, our fees are based on the following conditions and assumptions described below.
• The technician's field hours are an estimate. It will vary depending on the contractor's schedule and progress. We will charge only for the hours' work performed.
• When full-time observation by a Converse representative is not required, the testing services described above will be performed on a test -results -only basis at the request of your authorized representative, who will be responsible for coordinating our services with the construction schedule. No comments regarding compaction procedures or observations will be made for test -results -only services. • For on -call services, the test locations will be prepared and ready for testing by Converse field personnel upon their arrival at the site. • Work will be conducted during an eight -hour day at the site. Overtime will be charged at 1.5 times the regular hourly rate.
• All requests for field service should be received by this office not less than one working day (24 hours) prior to the time the services are to be performed. • There will be a 2 -hour minimum charge in case of work cancellation after our field personnel have been dispatched.
• There may be a 2 -hour minimum charge if services are cancelled within 6 hours of the scheduled call out time.
• There will be a 4 -hr minimum charge for field services performed for less than 4 hours.
• The contractor and/or client will be responsible for excavating and backfilling all test locations.
r/►.� Converse Consultants
M:\JOBFILE\2024\81\24-81-263 City of Beaumont, Mesa Lift Station Upgrades\Proposal\24-81-263_pro(30)Beaumont-liftstation
Cost Proposal to Provide Materials Testing Services
Mesa Lift Station Upgrade Project (CIP WW -11) (RFP #WW-MLS24-2) 12940 Potrero Boulevard
City of Beaumont, San Bernardino County, California
September 16, 2024
• Our field representative will not direct, supervise or lay out the work of the contractor.
• Our services will not include a review of the contractor's safety measures on or near the job site.
• If any additional inspection or laboratory testing is required, it will be performed in accordance with the attached Schedule of Fees.
• Converse field reports will be provided to your authorized representative in the field on a daily basis as the testing is completed. The field reports will summarize test results and time charged per day, and document work performed. • Meetings and consultations not described above, that are requested by the client, are not included in the cost summary, but will be charged on a time -and -materials basis in accordance with the attached Schedule of Fees. • Should additional services be required other than those presented herein, we will discuss the matter with you. If requested, we will prepare a detailed proposal and cost estimate for such services. Additional services will not be performed without prior written authorization.
• No services will be provided prior to our signature of an agreement with you. No additional work required will be provided without written authorization and a budget amendment from your authorized representative.
Please contact Dr. Quazi if you have any questions or would like to discuss our submittal in greater detail. We appreciate the opportunity to work with the City of Beaumont.
CONVERSE CONSULTANTS
Hashmi Quazi, PhD, PE, GE
Principal -In -Charge / Project Manager
Dist.: 1/Addressee (email)
Encl: Schedule of Fees and General Conditions
Converse Consultants
M:\JOBFILE\2024\81\24-81-263 City of Beaumont, Mesa Lift Station Upgrades\Proposal\24-81-263_pro(30)Beaumont-liftstation
Appendix
CONVERSE CONSULTANTS
Prevailing Wage Schedule of
Fees Personnel
Introduction
It is the objective of Converse Consultants to provide its clients with quality professional and technical services and a continuing source of professional advice and opinions. Services will be performed in a manner consistent with that level of care and skill ordinarily exercised by members of the profession currently practicing in the same locality under similar conditions. This fee schedule is valid through December 31, 2024.
Hourly Charges for Personnel
Staff assignments will depend on personnel availability, job complexity, project site location, and experience level required to satisfy the technical requirements of the project and to meet the prevailing standard of professional care.
Field Technical Services (all including vehicle and equipment) Construction Inspector — ACl/ICC and/or AWS/CWI certified (concrete, post -tension, masonry, structural steel, fireproofing; includes concrete batch plant and local steel fabrication inspections) $150 DSA Masonry Inspector 150
Non -Destructive Testing Inspector (ultrasonic, magnetic particle, dye penetrant, skidmore, pull testing, torque testing, Schmidt hammer, and pachometer) 150
Coring Technician 150
Soils Technician (soil, base, asphalt concrete, and moisture emission testing) 150 Sample Pick -Up 65
Professional Services (consultation for field and office, if requested) Staff Professional $135
Senior Staff Professional 145
Project Professional 155
Project Manager 175
Senior Professional 175
Principal Professional 220
Principal Consultant 235
Laboratory Testing
Laboratory Technician Per Test
(see Geotechnical Laboratory Testing and Materials Testing Services fee schedules.) Laboratory Supervisor $100
Office Support
Clerical/Word Processing $80
Drafting 80
CAD Operator/Drafting Manager 85
Overtime and special shift rates for Field Services personnel are determined in accordance with Prevailing Wage law. Travel time to and from the job site will be charged at the hourly rates for the appropriate personnel.
Expenses
1. Exploration expenses (drilling, trenching, etc.) are charged at cost plus fifteen percent.
2. Travel and subsistence expenses (transportation, room and board, etc.) for individuals on projects requiring travel and/or living 50 miles away from the project site are charged at cost plus fifteen percent.
3. Automobile and truck expenses are charged at cost plus fifteen percent (rentals) or at the current IRS milage rate per mile for company -owned vehicles traveling between principal office and project.
4. Other out-of-pocket direct project expenses (aerial photos, long-distance telephone calls, permits, bonds, outside printing services, tests, etc.) are charged at cost plus fifteen percent.
Invoices
1. Invoices will be submitted to the Client on a monthly basis, and a final bill will be submitted upon completion of services.
2. Payment is due upon presentation of invoice and is past -due thirty days from invoice date. In the event Client fails to make any payment to Converse when due, Converse may immediately cease work hereunder until said payment, together with a service charge at the rate of eighteen percent per annum (but not exceeding the maximum allowed by law) from the due date, has been received.
Further, Converse may at its sole option and discretion refuse to perform any further work irrespective of payment from Client in the event Client fails to pay Converse for services when said payments are due.
3. Client shall pay attorneys' fees or other costs incurred in collecting any delinquent amount.
General Conditions
The terms and provisions of the Converse General Conditions are incorporated into this fee schedule as though set forth in full. If a copy of the General Conditions does not accompany this fee schedule, Client should request a copy from this office.
Converse Consultants PW2024 rage 13bb 0
Compensation for laboratory testing services will be m
engineering time. Costs of tests not on this schedule w rates are based on non -contaminated soil. A surcharge
based on the project.
IDENTIFICATION AND INDEX PROPERTIES TESTS
Visual Classification, ASTM D2488
Engineering Classification, ASTM D2487
Moisture Content and Dry (bulk) Density,
ASTM D2216 and D2937
Moisture Content, ASTM D2216
Shrinkage Limit, ASTM D4943
Atterberg Limits, ASTM D4318
Several points
One Point
Particle Size Analysis, ASTM D6913
Fine Sieve, from +#200 to #4
Coarse and Fine Sieve, from #200 to 3 in
Hydrometer
Percent Passing #200 Sieve, ASTM D1140
Specific Gravity
Fine, passing #4 sieve, ASTM D854 100.00
Coarse, retained on #4 sieve, ASTM C127 100.00
Sand Equivalent Test, ASTM D2419 130.00
Double Hydrometer Dispersion, ASTM D4221 150.00
COMPACTION AND BEARING STRENGTH
Standard Proctor Compaction, ASTM D698 or ASTM D1557
Method A or B 200.00
Method C, 6" mold 210.00
California Impact Method, Caltrans 216 220.00
R -value, ASTM D2844 and CTM301 270.00
California Bearing Ratio (CBR), ASTM D1883
1 Point 530.00
3 Points 750.00
Relative Density
0.1 Cubic Foot Mold 200.00
0.5 Cubic Foot Mold 300.00
SHEAR STRENGTH
Torvane/Pocket Penetrometer 25.00
Direct Shear
Quick Test 75.00
Consolidated, Drained, granular soil,
ASTM D3080 220.00
Consolidated, Drained, fine grained soil,
ASTM D3080 260.00
Consolidated, Undrained, fine grained soil 220.00
Residual Strength, per cycle 70.00
Remolded Specimens 70.00
STATIC UNIAXIAL AND TRIAXIAL STRENGTH TESTS
(PER POINT)
Unconfined Compression, ASTM D2166 150.00
Unconsolidated, Undrained, ASTM D2850 160.00
Consolidated, Undrained, per point 700.00
Consolidated, Drained, per point 700.00
With Pore Pressure Measurement, per load 150.00
Remolded Specimen 90.00
CONSOLIDATION (ASTM2435) AND SWELL COLLAPSE
(ASTM D4546) TESTS
8 Load Increments 250.00
Additional Load Increment 50.00
Time -Ratio, per load increment 90.00
Single Point, collapse test 90.00
25.00 20.00
85.00 CONVERSE CONSULTANTS
Schedule of Fees - Geotechnical Laboratory Testing
ade in accordance with this fee schedule which includes test report(s) and ill be by quote and/or in accordance with our current hourly fee schedule. The will be charged for handling contaminated material, which will be determined Single Load Swell, ASTM D4546
20.00 Ring Sample, Field Moisture 95.00
25.00 Ring Sample, Air Dried 95.00
Remolded Sample 70.00
Expansion Index Test, UBC 29-2/ASTM D4829 130.00
HYDRAULIC CONDUCTIVITY TESTS
Constant Head, ASTM D2434 250.00
150.00 Falling Head Flexible Wall, ASTM D5084 300.00
50.00 Triaxial Permeability, EPA 9100 350.00
Remolded Specimen 60.00
100.00
180.00 CHEMICAL TESTS
120.00 Corrosivity (pH, resistivity, sulfates, chlorides) 220.00
80.00 Organic Content, ASTM D2974 100.00
Conditions: Unit rates presented on this fee schedule are for routinely performed geotechnical laboratory tests. Numerous other earth material physical tests can be performed in our geotechnical laboratories, including rock core, soil cement and soil lime mixture tests. Tests not listed can be quoted upon request. This fee schedule is valid through December 31, 2024.
Prices are based on the assumption that samples are uncontaminated and do not contain heavy metals, acids, carcinogens and/or volatile organics which can be measured by an organic vapor analyzer or photoionization detector with a concentration greater than 50 parts -per -million (ppm). Quoted testing fees are based on the assumption that no protective clothing will be required to handle samples. If Level D protective clothing will be required during handling of samples (as defined in Federal CFR Part 1910.120), then a 40% increase in fees presented in this schedule will be applied. Level C protective clothing will be a 60% increase in fees. Converse will not handle samples that require either Level B or Level A protection in our geotechnical laboratories.
Contaminated samples will be returned to the client. Uncontaminated samples will be disposed of 30 days after presentation of test results. The client must disclose the source of samples. Samples imported from out of state will be incinerated after testing in accordance with requirements of the United States Department of Agriculture. Soil samples obtained within the State of California currently designated quarantine areas will also be incinerated in accordance with the requirement of the State of California, Department of Food and Agriculture, Division of Plant Industry, Pest Exclusion. A $5.00 incineration fee will be added to each sample that is required to be incinerated in accordance with State and Federal law.
Test results requiring plots will be presented in a publishable format generated from computer programs. Otherwise, raw test numbers will be presented. A minimum laboratory fee of $50.00 will be charged to present and mail test results. Beyond the standard U.S. Mail delivery, specialized transmittal will be charged at additional cost (e.g., Federal Express, UPS, etc.). Geotechnical testing does not include engineering and/or geologic review and analysis.
Typical turnaround for geotechnical laboratory testing is two weeks (or roughly ten working days). To expedite test turnaround to five working days, a 50% increase in the fees in this schedule will be applied. Many geotechnical tests require at least one week to perform in accordance with ASTM or other standard specifications. Fees presented in this schedule for relatively undisturbed direct shear, consolidation or expansion pressure tests are based on the assumption that 2.416 -inch inside diameter brass ring samples will be provided to the geotechnical laboratory for testing. Remolded specimens will be compacted in standard 2.5 -inch outside diameter brass rings for direct shear, consolidation and expansion pressure tests. All fees presented in this schedule are based on the assumption that the client will deliver samples to our laboratory at no additional cost to Converse.
Invoices will be issued monthly and are payable on receipt unless otherwise agreed upon. Interest of 1.5% per month (but not exceeding the maximum allowed by law) will be payable on any amount not paid within thirty days; payment thereafter to be applied first to accrued interest and then to the principle unpaid amount. The Client shall pay any attorneys' fees or other costs incurred in collecting any delinquent amounts.
Converse Consultants GLT2024
CONVERSE CONSULTANTS
Schedule of Fees - Materials Laboratory Testing
Compensation for laboratory testing services will be based on rates in accordance with this fee schedule which includes test report(s) and engineering time. Costs of tests not on this schedule will be by quote and/or in accordance with our current hourly fee schedule. Our services will be performed in accordance with the General Conditions. This fee schedule is valid through December 31, 2024.
AGGREGATES
Moisture Content, ASTM D2216 25.00
Particle Size Analysis
Coarse, ASTM C136, each 120.00
Coarse and Fine, ASTM C136 & C137), each 180.00
Specific Gravity & Absorption
Coarse Aggregate, ASTM C127 115.00
Fine Aggregate, ASTM C128 175.00
Unit Weight per Cubic Foot, ASTM C29 75.00
Soundness, Sodium or Magnesium, ASTM C88, each 550.00
Potential Alkali Reactivity, ASTM D289 700.00
Freeze Thaw Soundness 175.00
Los Angeles Abrasion, per class, ASTM C131, C535 375.00 Sand Equivalent, ASTM D2419 180.00
Lightweight Particles, ASTM C123, each 300.00
Clay Lumps & Friable Particles, ASTM C142, each 290.00
Stripping Test, ASTM D1664, each 85.00
Organic Impurities, ASTM C40 140.00
Durability By Quote
CONCRETE TESTS
Laboratory Trial Batch, ASTM C192 By Quote
Laboratory Mix Design, Historical Data By Quote
Compression Test, 6"x12" Cylinder, ASTM C39, each 45.00 Lightweight Concrete
Compression 45.00
Unit Weight 45.00
Specimen Preparation, Trimming or Coring, each 75.00
Bond Strength, ASTM C321
Prepared by Converse 250.00
Prepared by Others 150.00
Core Compression Test, ASTM C12, each 120.00
Flexure Test, 6"x6" Beams, ASTM C78, each 130.00
Modulus of Elasticity, Static, ASTM C469, each 275.00
Length Change, ASTM C157, 3 bars, 5 readings each,
up to 26 days 550.00
Splitting Tensile, 6"x12" Cylinders, each 110.00
Field Concrete Control (sampling, slump, temperature,
cast 4 cylinders, molds, cylinder pick-up, within 10 miles of office, stand-by extra), ASTM/UBC, hourly rate
schedule, or each cylinder 95.00
Field Concrete Control (same as above plus air content test), ASTM/UBC, each cylinder 95.00
Hold Cylinder 10.00
Cylinder Mold, sent to job site but not cast by Converse or returned to Converse 5.00
MASONRY (ASTM C140, E447, UBC STANDARD 24-22)
Moisture Content, as received, each 105.00
Absorption, each 85.00
Compression, each 85.00
Shrinkage, ASTM C426, each 250.00
Net Area and Volume, each 30.00
Masonry Blocks, per set of 9 1,500.00
Masonry Core Compression, each 125.00
Masonry Core Shear, each 245.00
Masonry Core Trimming, each 150.00
Compression Test, grouted prisms, 8"x8"x16", each 300.00 Compression Test, grouted prisms, 12"x16"x16", each 425.00 Compression Test
2"x4" Mortar Cylinder, each 45.00
3"x6" Grout Prisms, each 45.00
2" Cubes, ASTM C109, each 45.00
Cast by Others 45.00
Mortar or Grout Mix Designs By Quote
FIREPROOFING TESTS
Oven Dry Density, per sample 80.00
MOISTURE EMISSION TEST
Moisture Emission Test Kit 85.00
ASPHALTIC CONCRETE
Stability, Flow, and Unit Weight, ASTM D6927 500.00
Marshall ASTM D1559, ASTM D2726 450.00
Measured Maximum Specific Gravity of Mix, ASTM 02041,
Rice Method, each 350.00
Void Analysis of Cores or Marshall Specimens,
Calculations Only, ASTM D3203, set of 2 or 3 60.00
Laboratory Mixing of Asphalt & Concrete, per sample 75.00 Complete Asphalt Concrete Mix Design
Hveem or Marshall By Quote
Extraction of Asphalt and Gradation, ASTM D2172, Method B, or California 310, including ash correction, each 455.00 Extraction of Rubberized Asphalt & Gradation, each 350.00 Specific Gravity, ASTM D2726 or ASTM D1188
Uncoated 95.00
Coated 125.00
Immersion -Compression 650.00
Particle Coating, ASTM D2489 95.00
Stripping, ASTM D1664 85.00
Moisture or Volatile Distillates in Paving Mixtures, or Materials Containing Petroleum Products or
By -Products 350.00
Retained Strength, ASTM D1074/D1075, 6 specimens By Quote Retained Stability, Mil, Std, 520A, Method 104,
6 specimens By Quote
CBR, ASTM D1883, including M/D Curve, 1 point 400.00
Asphalt Temperature 15.00
STRUCTURAL STEEL
Tensile Test #9 Bar or Smaller, each 60.00
Bend Test #9 Bar or Smaller, each 60.00
Tensile Test #10 Bar or Greater, each 300.00
Tensile Test #14 Bar, each 330.00
Rebar Coupler Tensile Test 160.00
Tensile Test, Welded #9 Bar or Smaller, each 160.00
Tensile Test, Welded #10 Bar or Greater, each 300.00
Tensile Test, Welded #14 Bar, each 330.00
Tensile Test, Mechanically Spliced, #9 Bar or Smaller,
each 210.00
Tensile Test, Mechanically Spliced, #10 Bar or Greater, each 350.00
HIGH STRENGTH BOLT, NUT, AND WASHER TESTING
Wedge Tensile Test, A490 Bolts
Under 100,000 lbs., each 130.00
Over 100,000 lbs., each 140.00
Wedge Tensile Test, A325 Bolts
Under 100,000 lbs., each 160.00
Tensile Test, Anchor Bolts, tested with displacement
transducers, each 300.00
Nut Hardness, Proof & Cone Proof Load Test, each 65.00
Washer Hardness, each 55.00
A325 or A490, Bolt Hardness Only, each 55.00
Bolt A325 or A490 Wedge Tensile
Under 100,000 lbs. & Hardness, each 240.00
Over 100,000 lbs. & Hardness, each 280.00
Bolt, Nut & Washer, all tests per set with bolts
Under 100,000 lbs. 400.00
Over 100,000 lbs. 500.00
See Schedule of Fees - Geotechnical Laboratory Testing for soil testing. Hourly rates are available upon request. Field Laboratory rates are available upon request. Listed unit rates are based upon the assumption that samples will be delivered to our laboratory at no cost to Converse.
Converse Consultants MTS2024
age
0 CONVERSE CONSULTANTS
General Conditions -
Right of Entry
Client warrants to Converse that it has full legal right to authorize Converse's entry upon the real property where Converse's services are to be performed ("Site" herein) and upon all property, if any, required for ingress and egress to the Site.
Client authorizes Converse to enter upon the Site and such adjoining property as is necessary to allow Converse to perform its services.
Converse will take reasonable precautions to minimize any damage to the Site; however, Client acknowledges that during the normal course of the performance of Converse's services, some damage to the Site may occur. The correction of any damage to the Site (surface or subterranean) shall be the obligation of the Client.
Information Supplied by Client
Client warrants the accuracy of any information supplied by it to Converse, acknowledges that Converse will not verify the accuracy of such information, and agrees that Converse is entitled to rely upon any such information.
Client shall immediately notify Converse in writing of any data, information or knowledge in the possession of or known to Client relating to conditions existing at the Site and shall provide Converse with the location, size and depth of any and all underground tanks, piping or structures existing upon the Site.
Client shall defend, indemnify and save harmless Converse, its officers, agents and employees from and against any and all daims, costs, suits and damages, induding attorneys' fees, arising out of errors, omissions and inaccuracies in documents and information provided to Converse by Client.
Ownership of Data and Documents; Samples
All reports, boring logs, field data, field notes, laboratory test data, calculations, estimates and other documents prepared by Converse shall remain the sole property of Converse.
Client shall have the right to the use of all data, recommendations, proposals, reports, design criteria and similar information provided to it by Converse ("information" herein); provided, however, that the information shall not be used or relied upon by any party other than Client, save and except as may be required by the design and licensing requirements of the project for which the information is provided; further, such use shall be limited to the particular site and project for which the information is provided. To the extent Client utilizes Converse's information by providing or making the same available to any third party (a) Client agrees to give written notice to any such third party that it may not utilize or rely on any aspect of Converse's information and (b) Client agrees to defend, indemnify and hold Converse harmless against any and all claims, demands, costs, losses, damages and expenses, including attorneys fees, that may be asserted against or sought from Converse by any such third party.
Clients right to the use of the information is expressly conditioned upon Client's prompt payment to Converse of all sums due under the Client/Converse agreement. In the event of Client's nonpayment or partial payment of said amounts, Client agrees that it shall not use any of the information for any purpose whatsoever and shall return the same to Converse within 2 business days upon demand.
Converse will retain all samples of soil, rock or other materials obtained in the course of performing its services for a period of thirty (30) days. Thereafter, further storage or transfer of samples to Client may be made at Client's expense upon written request from Client to Converse received by Converse prior to the expiration of the 30 -day period.
Converse shall retain permanent records relating to the Converse services for a period of five (5) years following submittal of Converse's report, during which period the records will be made available to Client upon reasonable notice given by Client and upon payment to Converse of an amount sufficient to reimburse Converse for its necessary and reasonable expenses in making said records available.
Standard of Care and Professional Responsibility
Client acknowledges that the services to be performed by Converse involve the use of tests, calculations, analyses and procedures which are in a constant state of development, improvement and refinement and that, as such, improvements, changes in methods, and modifications of procedures have been made in the past, are now being made, and are expected to continue to be made in the future.
Further, Client recognizes that, while necessary for investigations, commonly used exploration methods, such as drilling borings or excavating trenches, involve an inherent risk. For example, exploration on a site containing contaminated materials may result in inducing cross - contamination, the prevention of which may not be complete using presently recognized sealing methods.
Client recognizes that the state of practice, induding but not limited to the practice relating to contamination or hazardous waste conditions, is changing and evolving and that standards existing at the present time may subsequently change as knowledge increases and the state of the practice continues to improve.
Client recognizes that projects containing contaminated materials may not perform as anticipated by Client, even though Converse's services are performed in accordance with the level of care and skill required of it. Further, certain govemmental regulations relating to hazardous waste sites may purport to require achievement of results which cannot be accomplished in an absolute sense. It is recognized that a satisfactorily designed, constructed and maintained monitoring system may assist in the early detection of environmental changes allowing for early correction of problems. Unless it is specifically included in the scope of services to be performed by Converse, Client understands that Converse shall not perform such monitoring.
The services to be provided by Converse pursuant to the agreement to which these General Conditions are a part shall be provided in accordance with generally accepted professional engineering, environmental, and geologic practice in the area where these services are to be rendered and at the time that services are rendered. Client acknowledges that the present standard in the engineering and environmental professions does not include, and Converse does not extend to Client, a guarantee of perfection of the work contemplated hereby; further, that even in the exercise of normal and reasonable care, errors or omissions may from time to time occur. Except as expressly set forth in these General Conditions, no other warranty, express or implied, is extended by Converse.
Converse shall have no duty to supervise, coordinate or otherwise be involved in the performance of services or work by any third -party consultant, contractor or subcontractor.
Where Converse's services involve field observation of grading, filling and compaction (or any of them), it is agreed:
a. That Converse shall in no way be responsible for the manner in which such work is performed by any third party.
b. That in the event Converse is to provide periodic observation, Client acknowledges that Converse cannot be responsible for any work performed at a time or times when Converse was not performing its observation services.
Converse will not provide an opinion conceming the performance of any third party, save and except to the extent that said work was in fact observed and tested by Converse during the course of construction.
c. That where Converse's services indude continuous observation, Client agrees not to allow grading, filling or compaction to be performed at any time or times when Converse is not physically present upon the Site and shall restrict the amount and extent of such grading, filling and compaction to that which can be properly observed by Converse personnel present on the Site. d. That in the event Converse is to conduct test borings for Client, Client acknowledges that the accuracy of said test borings relates only to the specific location in which the boring itself was performed and that the nature of many sites is such that differing subsurface soil characteristics can be experienced within a small distance. As such, Client acknowledges that greater accuracy is obtained when the number of test borings is increased.
Technical Limitations
Client acknowledges and agrees that: (1) it is unreasonable to expect Converse to be able to completely evaluate subsurface conditions, even after the most comprehensive exploratory program; (2) site conditions change frequently due to the passage of time, human activities, and climatic conditions and uncertainties are therefore inherent in the nature of Converse's services and impossible to avoid; (3) the identification of geotechnical and environmental conditions and the prediction of future or concealed conditions is an inexact scientific endeavor; (4) the state of the art of geotechnical and environmental practice is such that Converse cannot guarantee that its recommendations will prove adequate on this project and the Client assumes the risk of any such failure, except as otherwise provided in these General Conditions and that (5) these General Conditions contains spedfic LIMITATIONS OF LIABILITY.
Indemnity of Client and Limitation of Liability
Converse shall indemnify Client, its officers, directors, agents or employees from any claim, demand or liability arising from personal injury or property loss or damage caused by the sole negligence or willful misconduct of Converse.
Anything to the contrary in the agreement to which these General Conditions are attached or in these General Conditions notwithstanding, Converse's liability shall be limited to the lesser of the fees charged to Client by Converse for the services performed for Client, or the sum of fifty thousand dollars. Client may, at its option, increase the maximum amount for which Converse shall be liable by payment of an additional fee.
For the maximum liability sum of one hundred thousand dollars, the additional amount to be paid shall be four percent of the total Converse fee charged hereunder; for the maximum liability sum of one million dollars, the additional amount to be paid shall be five percent of the total Converse fees charged hereunder Client acknowledges and agrees that its recovery, if any, shall be satisfied, in the first instance, from the proceeds of Converse's insurance, and to the extent of any deficiency in the available insurance proceeds, then and only then, by Converse.
Client acknowledges that Converse has agreed to charge Client a reduced fee for services in exchange for the above limitation of liability and that said reduction in fees is consideration for said limitation.
Client shall defend and save harmless Converse, its officers, directors, agents and employees from all liability, claims and demands, including expenses of suit and reasonable attomeys' fees arising from personal injuries, including disease and death, property loss or damage, injury to others (including personnel of Client, Converse or Converse Consultants GC99-1
subcontractors performing work hereunder), and air or ground pollution or environmental impairment arising out of or in any manner connected with or related to the performance of Converse's services, except where there is a judicial determination that such injury, loss or damage shall have been caused by the sole negligence or willful misconduct of Converse.
Client acknowledges that Converse has charged Client a reduced fee for services to be performed by it in exchange for this hold harmless and that the reduction in fees is consideration for said hold harmless provision.
Converse will not be liable for consequential damages of any kind, nature or description.
Hazardous Waste, Pollution and Health Hazard Projects ("Hazardous Projects" Herein)
Prior to the commencement of services by Converse on any hazardous project, Client agrees to advise Converse in writing of any known hazardous waste or materials existing on or near the Site or if any of said services are to be performed in an area where dust, fumes, gas, noise, vibrations or other particulate or nonparticulate matter is in the atmosphere where it raises a potential or possible health hazard or nuisance to anyone working within the area.
Anything in these General Conditions notwithstanding, Client shall indemnify and hold Converse, its officers, directors, agents, servants and employees, harmless from any claim, demand or action brought by any party whomsoever, including employees of Converse which claim, demand or action is based upon injury or damage caused or alleged to have been caused by hazardous wastes or hazardous materials whether or not such waste or materials were known to exist prior to the commencement of services.
Client agrees to be responsible for the removal and disposal of any hazardous waste uncovered as a result of the site investigation, including drill cuttings, unless specifically included within the scope of work
It is agreed that the discovery of unanticipated hazardous materials constitutes a changed condition mandating an immediate renegotiation of the scope of services or termination of services. Converse will at all times endeavor to perform in a faithful and trustworthy manner. Client understands that Client or Converse may be required by local and/or state and/or federal statute to report the discovery of hazardous materials to a government agency. Client also understands that Converse may be required by local and/or state and/or federal statute to report the discovery of hazardous materials to a government agency, and that Converse, when practical, will do so only after notifying Client. In the event Converse discovers hazardous material that we believe poses an immediate threat to public health and safety, Converse will use its best judgment to notify appropriate emergency personnel for immediate containment. Client agrees to take no action of any kind against Converse when Converse makes a good -faith effort to fulfill its obligations.
Client's Responsibilities
Client shall immediately provide Converse with full information in writing as to Client's requirements for the services to be provided by Converse and shall designate in writing within five (5) days of the effective date of the agreement to which these General Conditions are a part, a representative to act on Client's behalf in conjunction with the services to be provided hereunder. Client shall promptly review all documents, reports, data and recommendations submitted by Converse and shall communicate with Converse conceming such reviews for the purpose of avoiding delay in the performance of the services to be rendered by Converse.
Client shall notify any third party who may perform on the Site of the standard of care being undertaken by Converse pursuant hereto and of the limitations of liability contained herein.
Client shall require as a condition to the performance of any such third party a like indemnity and limitation of liability on their part against Converse.
Confidentiality
Converse shall hold all information provided to it by Client and the results of the work performed by it confidential and shall not disclose the same to any third party except where required by Govemmental regulatory agencies or as otherwise required by law.
Disputes
Converse shall have the right to bring a legal action in a state or federal court against Client for any sums due or alleged to be due to it or for services rendered. Except for this right, Converse and Client agree that as an express condition to the right of either party to bring a legal action against the other, they shall first submit any dispute to mediation by a neutral person acceptable to both parties.
Each party shall bear its own attorneys' fees, costs and other expenses, except that each party shall be responsible and pay for one-half of the costs and expenses of the mediator.
In the event that legal action is required, the prevailing party shall be entitled to recover all of its costs incurred in connection therewith including, without limitation, staff time, court costs, attorneys' fees, consultant and expert witness fees and any other related expenses. In this regard, in order to make the prevailing party whole, the parties acknowledge and agree that the prevailing party shall be entitled to recover all of its costs incurred in connection with the legal action and shall not be limited to "reasonable attorneys fees" as defined in any statute or rule of court.
The obligations, responsibilities, warranties and liabilities of the parties shall be solely those expressly set forth herein. Remedies and limitations of liability shall apply regardless of whether an action is brought in contract, or is based on either party's negligence, or another theory of law. All of the rights, remedies, obligations, terms, conditions and limitations of liability stated herein shall extend collectively to and be binding upon the parties' partners, joint ventures, licensors, successors, assigns, insurers, and affiliates. Client and Converse agree that any legal action with respect to the services to be performed under these General Conditions shall be brought against the parties, and not against individual officers, employees or former employees of the parties. All legal actions by either party against the other for breach of these General Conditions or for the failure to perform in accordance with the applicable standard of care, however framed, that are essentially based upon such breach or failure shall be barred two (2) years from the time claimant knew or should have known of its right to make a claim, but, in any event, not later than four (4) years from substantial completion of Converse's services.
Jobsite Safety
Converse shall be responsible for its activity and that of its employees on the Site.
This shall not be construed to relieve the Client, its general contractor or any subcontractor of their obligation to maintain a safe jobsite.
Neither the professional activities nor the presence of Converse or its employees and subcontractors shall be understood to control the operations of others, nor shall it be construed to be an acceptance of the responsibility for jobsite safety.
Converse will not direct, supervise or lay out the work of the Client, contractor, or any subcontractors. Converse's services will not include a review or evaluation of the adequacy of the contractor's safety measures on or near the Site.
Schedules
Unless otherwise specified in the agreement, Converse shall be obligated to perform within a reasonable period of time. Converse shall not be responsible for delays in the completion of its services created by reason of any unforeseeable cause or causes beyond the control and/or without the fault or negligence of Converse, including but not restricted to acts of God or the public enemy, acts of the Government of the United States or of the several states, or any foreign country, or any of them acting in their sovereign capacity, acts of other contractors with Client, fire, floods, epidemics, riots, quarantine restrictions, strikes, civil insurrections, freight embargoes, and unusually severe weather.
Should completion of any portion of the services to be rendered by Converse be delayed beyond the estimated date of completion for any reason which is beyond the control of or without default or negligence of Converse, then and in that event Client and Converse shall mutually agree on the terms and conditions upon which the services may be continued or terminated.
Invoices
Converse shall submit monthly progress invoices to Client, and a final bill shall be submitted upon completion of the services. Within thirty (30) days after receipt of an invoice, Client shall pay the full amount of the invoice. If Client objects to all or any portion of any invoice, it shall so notify Converse of the same within fifteen (15) days from the date of receipt of said invoice and shall pay that portion of the invoice not in dispute, and the parties shall immediately make every effort to settle the disputed portion of the invoice.
If Client fails to make payment within thirty (30) days after receipt of an invoice, then Client shall pay an additional monthly service charge of one and one-half percent (1% %) on all such amounts outstanding. The additional charge shall not apply to any disputed portion of any invoice resolved in favor of Client. In the event Client fails to pay any undisputed amount to Converse when due, Converse may immediately cease work until said payment together with a service charge at the rate of 1% % per month, as specified above, from the due date has been received.
Further, Converse may, at its sole option and discretion, refuse to perform any further work irrespective of payment from Client.
In the event that all or any portion of the 1% % service charge provided for herein is deemed to be an interest charge, then and in that event said interest charge shall be limited to the maximum amount legally allowed by law.
Client acknowledges Converse's fee schedules are revised annually and agrees that the fee schedule in effect at the time the services are performed shall apply to such services.
Insurance
Converse represents that it now carries, and will continue to carry during the term of the contract to which these General Conditions are a part, Workers Compensation insurance and that, if requested, Converse shall provide to Client certificates as evidence of the aforementioned insurance.
Assignments
Client shall not assign this contract or any portion thereof to any other person or entity without the express written consent of Converse. Nothing contained in this contract or any part thereof shall be construed to create a right in any third party whomsoever, and nothing herein shall inure to the benefit of any third party.
Severability
If any provision of these General Conditions is finally determined to be contrary to, prohibited by, or invalid under applicable laws or regulations, such provision will be renegotiated so as to give effect to the intent of the parties to the maximum possible extent. Such determination and renegotiation shall not affect of invalidate the remaining provisions or these General Conditions.
Governing Law
These General Conditions shall be governed by and construed under the laws of the State of California.
Converse Consultants GC99-1
City of Beaumont Agreement #
C24-110
EXHIBIT "B"
CERTIFICATES OF INSURANCE AND ENDORSEMENTS
(insert behind this page)
A`c I® CERTIFICATE OF LIABILITY INSURANCE
DATE(MM!DDrYYYY)
08/26/2024
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the po icy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
PRODUCER
Poms & Associates Insurance Brokers
CA License #0814733
4500 Park Granada, Suite 206
Calabasas CA 91302
CONTACT Jennifer De Jesus
NAME:
PAHONIE Extl. (800) 578-8802 ;a/c, Nol: (818) 449-9321
E-MAIL ) jdeesus omsassoc.com
ADDRESS: @p
INSURER(S)AFFORDING COVERAGE
NAIC N
INSURER A: Crum & Forster Indemnity Co/C&F
INSURED
The Converse Professional Group
717 S. Myrtle Avenue
Monrovia CA 91016
INSURER B: Travelers Property Casualty Insurance Company 36161
INSURER C :
INSURER D :
INSURER E :
INSURER F
COVERAGES
CERTIFICATE NUMBER: 24-26 GL/BA/PROF
REVISION NUMBER:
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLIC ES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR
LTR
TYPE OF INSURANCE
ADM
INSD
'11BH
WVD
POLICY NUMBER
POLICY EFF
(MM/DD/YYYY)
POLICY EXP
(MMIDD/YYYY)
LIMITS
A
X
COMMERCIAL GENERAL LIABILITY
Y
Y
EPK-148213
06/30/2024
06/30/2026
EACH OCCURRENCE
$ 1,000,000
CLAIMS-MADE
X
OCCUR
DAMAGE TO RENTED
PREMISES (Ea occurrence)
0010
$ 0,0
MED EXP (Any one person)
$ 5,000
PERSONAL &ADV INJURY
$ 1,000,000
GEN'LAGGREGATE
7 POLICY
OTHER:
LIMITAPPLIES PER:
X PRO
JECT LOC
GENERAL AGGREGATE
$ 3,000,000
PRODUCTS-COMP/OPAGG
3,000,000
$
Contractors Pollution
$ 1,000,000
B
AUTOMOBILE
X
LIABILITY
ANY AUTO
OWNED
-
_
SCHEDULED
AUTOS
NON -OWNED
AUTOS ONLY
Y
Y
810 -3N061037 -24-43-G
08/17/2024
08/17/2025
COMBINED SINGLE LIMIT
(Ea accident)
$ 1,000,000
BODILY INJURY (Per person)
$
BODILY INJURY (Per accident)
$
PROPERTY DAMAGE
(Per accident)
$
Roadside Assistance
$
UMBRELLA LIAB
EXCESS LIAB
_
OCCUR
CLAIMS -MADE
EACH OCCURRENCE
$
AGGREGATE
$
DED RETENTION $
$
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY Y / N
ANY PROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
N /A
PER
STATUTE
OTH-
ER
E.L. EACH ACCIDENT
$
E.L. DISEASE - EA EMPLOYEE
$
E.L. DISEASE - POLICY LIMIT
$
A
Errors & Omissions
Retro Date: 8/14/1984
EPK-148213
06/30/2024
06/30/2026
Each Claim
Aggregate
Deductible Each Claim
1,000,000
1,000,000
25,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may he attached if more space is required) The City of Beaumont, its elected and appointed officers, employees, agents and volunteers are included as Additional Insured as required by written contract with respect to General Liability and Auto Liability. Waiver of Subrogation wording applies per attached form. 30 Days Notice of Cancellation to cert holder, 10 days for non-payment of premium applies.
*This Certificate of Insurance supersedes all previously issued certificates.
CERTIFICATE HOLDER
CANCELLATION
City of Beaumont
550 East 6th Street
Beaumont
I
CA 92223
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
©1988-2015 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are registered marks of ACORD