• Deliverables: Consultant shall submit all meeting agendas and presentations to the City a minimum of 2 working days prior to meetings. Draft meeting minutes shall be submitted within three (3) working days following each meeting. Within 3 working days of receiving City and stakeholders' comments, these comments shall be incorporated and final minutes published for distribution and record.

Task 2 — Data Gathering and Analysis
• Gather, review, and understand information on the City's previous planning and design efforts for the Project, including a detailed review of all associated reference documents. • Conduct field visits, inquiries, and investigations to acquire and review all relevant records of existing and proposed utilities including review of record drawings, property boundaries, and right-of-way, environmental and geologic information, as well as to document physical conditions, features, and constraints within the Project area. • Acquire mapping, record drawings, and relevant information (aerial, utility, topographic, geologic, environmental, etc.) from City, County, USGS, and other agency sources. • Compile base mapping.
• Review the conditions of the existing Downtown area and the best options and ways to integrate the proposed features described in the Downtown Beaumont Revitalization Plan. • Complete an independent review of all reference documents provided to either confirm the design recommendations or suggest alternatives. Alternative recommendations shall be identified and discussed in this Scope of Services. At a minimum, Consultant review shall include the following:
o Potential environmental concerns
o Potential regulatory requirements and permits
o Potential utility conflicts and concerns
o Hydrological concerns
o Downtown Beaumont Revitalization Plan - Elevate 2025
o 2040 General Plan PEIR
o General Plan and Downtown Zoning Ordinance
• Meet with City staff and discuss standards, expectations, project approach, and results of data gathering and analysis.
• Deliverables: Consultant shall summarize the results of this task into the Preliminary Design Report (PDR) and submit one (1) electronic copy (searchable pdf), for City review.

City comments shall be incorporated into the final PDR.

Task 3 - Investigations
Task 3.1 Survey and Centerline Control
• Consultant shall conduct topographical and/or aerial surveys of the Downtown area

Page 1290 of 1893 ends

including the full width of the adjacent rights -of -way with 1 -foot contours and cross sections as necessary.
• Consultant shall set centerline control to establish and mark the legal boundaries of the Right-of-way using surveying techniques and existing street and centerline monuments. • Consultant shall place physical markers like iron pins or concrete monuments to indicate the centerline and property lines.
• Deliverables: Results of the Survey and Centerline Control shall be documented and summarized in a Technical Memorandum (TM) that includes exhibits and maps. Results of the Survey and Boundary Control shall be incorporated into the Preliminary Design Report (PDR).

Task 3.2 Richt-of-Way Analysis
• Confirm Existing ROW - Consultant shall perform a Right -of -Way Analysis based on the collected information of the Topographic Survey and Centerline Control. Consultant shall identify the existing right-of-way and ROW boundaries within the project area. The scope of work includes acquiring title reports of all properties fronting the ROW. • Develop Proposed ROW — Develop the additional right-of-way within the Downtown boundaries the City will need to acquire to construct gateway roundabouts, sidewalks, curbs and gutters, and associated infrastructure.
• Deliverables: Results of this Right -of -Way Analysis shall be documented and summarized in a Technical Memorandum (TM) that includes a ROW Plan showing existing property line, proposed ROW acquisitions from adjacent properties, proposed ROW dedications, and final proposed ROW lines. Results of the Right -of -Way Analysis shall be incorporated into the Preliminary Design Report (PDR).

Task 3.3 Utility Research and Potholinc
• Request and acquire utility maps for all utilities within the project area. Develop a utility matrix and create maps for all utilities.
• Define the quantity of utility poles and appurtenances that will need to be undergrounded, removed, and/or relocated in the Downtown Beaumont project area. • Define the quantity and location of utility potholing efforts required for Final Design. • Deliverables: Results of the Utility Research and Potholing shall be documented and summarized in a Technical Memorandum (TM) that includes associated costs for undergrounding, removing, and/or relocating utilities. Results of the Utility Research and Potholing shall be incorporated into the Preliminary Design Report (PDR) and Preliminary Design Plans.

Task 3.4 Geotechnical Investigation
• Perform a geotechnical investigation within the proposed Downtown area boundaries to

Page 1291 of 1893 ends

include any regional seismicity, seismic parameters, fault line evaluation, liquefaction, site preparation, trench stability, suitability of onsite materials for backfill, trench excavation, shoring, dewatering, pipeline bedding, and backfill recommendations, asphalt coring, structural sections for concrete and asphalt, and all other necessary information required for a complete design.
• Deliverables: Results of the Geotechnical Investigation shall be documented and summarized in a Geotechnical Report that includes preparation of street pavement and structural sections. Results of the Geotechnical Investigation shall be incorporated into the Preliminary Design Report (PDR) and Preliminary Design Plans.

Task 3.5 Hydrological/Drainage Assessment
• The Consultant shall perform a hydrological assessment of the runoff entering and exiting the Downtown area and maintain the routing of historical flows as a result of the proposed improvements. This shall include a risk assessment of the current and proposed drainage capacity of the Downtown area, as well as an assessment of how the proposed project may alter flows. Report shall include all necessary street grading or infrastructure modifications needed to maintain historical flows. Varying storm events should be modeled, including the 10 -year and 100 -year storm events. • The Consultant shall also perform a regional hydrological assessment to quantify regional runoff volumes tributary to the Downtown Beaumont project area. As opposed to just maintaining the routing of historical flows, this assessment shall identify potential deficiencies in the existing infrastructure and existing conditions, and propose solutions that can be implemented with the new design to improve stormwater capture and runoff volumes. This may include installation of new storm drains or upsizing of existing storm drains, as well as alteration of existing upstream and downstream infrastructure to improve the existing runoff conditions in the project area. Varying storm events should be modeled, including the 10 -year and 100 -year storm events.
• If the hydrological assessment or any proposed improvements to the Downtown area result in recommendations to alter the existing grade elevations, these changes shall be coordinated, reviewed, and approved by the City.
• Deliverables: Results of the Hydrological/Drainage Assessment shall be documented and summarized in a draft Hydrology Report. Results of the Hydrological/Drainage Assessment (Report) shall be incorporated into the Preliminary Design Report (PDR) and Preliminary Design Plans.

Task 3.6 Traffic Studies and Assessments
• A Traffic Impact Analysis (TIA) shall be conducted to assess the potential improvement impacts on existing traffic conditions in Downtown Beaumont. The TIA shall review the impacts of all the proposed elements recommended in the DBRP, including but not limited to, traffic slowing measures, bike lane additions and modifications, additional cross walks and pedestrian paths, road striping modifications, additional parking, and all other aspects of the proposed DBRP.
• A roundabout analysis shall be conducted to determine the type and size of the proposed

Page 1292 of 1893 ends

roundabouts, number of lanes, speed limit, etc.
• Deliverables: Results of Traffic Studies and Assessments shall be documented and summarized by individual types of Study and Assessments. Results of the Traffic Studies and Assessments shall be incorporated into the Preliminary Design Report (PDR) and Preliminary Design Plans.

Task 3.7 Street and Pedestrian Lighting Analysis
• Part of the preliminary design will be proposed new lighting in the downtown project area.

This may include decorative streetlights, post lights, pathway lights, lighted bollards, and landscape lighting that address safety, mobility, and aesthetics to accommodate a vibrant pedestrian downtown area. A lighting analysis shall be conducted to determine adequate lighting needs throughout the project area. Calculations shall determine the appropriate spacing, height, and lumens for all proposed lighting improvements. • Deliverables: Results of the Lighting Analysis shall be documented and summarized by a technical memorandum. Results of the Lighting Analysis shall be incorporated into the Preliminary Design Report (PDR) and Preliminary Design Plans.

Task 3.8 Tree Impact Analysis
• The Downtown Beaumont Revitalization Plan (DBRP) exhibits depict the installation of trees within the project area. Consultant shall define and determine the impacts of adding and removing trees along these corridors.
• The Analysis shall include the cost impacts to existing trees in Downtown Beaumont. • Deliverables: Results of the Impacted Trees Analysis shall be documented and summarized by a Technical Memorandum (TM). Results of the Impacted Trees Analysis shall be incorporated into the Preliminary Design Report (PDR) and Preliminary Design Plans.

Task 4 — Design Options
• With the information and results from the Data Gathering and Analysis (Task 2) and the Investigations (Task 3), the Consultant shall prepare a minimum of three (3) Design Options best feasible for Downtown Beaumont; as necessary to achieve the goals outlined in the Downtown Beaumont Revitalization Plan (DBRP); and, construct the proposed improvements in an efficient and cost-effective manner, as well as, minimize impacts on adjacent properties, traffic flow and the public.
• Each Design Option shall incorporate a comprehensive summary of all features analyzed in the previous tasks, including both engineering options and aesthetic options (color, material, themes, etc.).
• Each Design Option shall be presented using detailed full color renderings showing all aspects of each option (sidewalk colors and materials; landscaping themes and plant types; lighting themes, materials and types; roundabout sizing, landscaping, and themes; options for striping, crosswalks, and pedestrian paths; bike lane options; parking options;

Page 1293 of 1893 ends

and all other items that will help create the full picture for each design option. • Each Design Option shall be accompanied by a full physical architectural color board that includes material samples and colors that go along with each design alternative. • Renderings and color boards for each Design Option will be used for presentation and to solicit feedback from City Executive Management, City Commissions, and the City Council.
• Upon selection of a Design Option, Consultant shall prepare a Preliminary Design Report (PDR), Preliminary Design Plans, and Preliminary Specifications based on the selected Option.
• Deliverables: Consultant shall create, construct, and/or assemble three (3) Design Option packages to be submitted to the City for feedback. Each Design Option package shall include large-scale full color renderings of the design options, accompanied by a maximum of five (5) physical architectural color boards to showcase each Option. A Preliminary Construction Cost Estimate shall be included for each design option.

Task 5 — Preliminary Design Report (PDR)
Task 5.1 Introduction
• Consultant shall prepare and include a summary of the project background, project description, benefits,
• The Introduction will serve as an executive summary of the Preliminary Design Report (PDR).

Task 5.2 Project Features and Design Criteria
• The Preliminary Design Report (PDR) shall include all design features described and illustrated in the Downtown Beaumont Revitalization Plan including, but not limited to, gateway roundabouts, intersection signalization, raised medians, landscaping, monument signs, parallel median parking, bike lanes, artistic crosswalks and striping, etc. • In addition to the Downtown Beaumont Revitalization Plan, the Consultant shall also reference the design criteria and guidelines in the City's General Plan and Downtown Zoning Ordinance.

Task 5.3 Preliminary Desicn (30% Plans)
• The Consultant shall prepare Preliminary Design plans based on the Preliminary Design Report (PDR) and Downtown Beaumont Revitalization Plan. • Preliminary Design Plans shall include preliminary Street Improvement Plans, Sidewalk, Pedestrian and ADA improvement Plans, Intersection Signalization Plans, Street and Pedestrian Lighting Plans, Signing and Striping Plans that includes adequate bicycle lanes, Landscaping and Irrigation Plans, Utility Plans with existing, proposed, upgrades

Page 1294 of 1893 ends

and relocation plans, Street Furniture Plans, Monument and Overhead Sign Plans, and Way Finding Signage Plans.
• Preliminary Design plans shall encompass the design features described and illustrated in the Downtown Beaumont Revitalization Plan including, but not limited to, gateway roundabouts, intersection signalization, raised medians, landscaping, monument signs, parallel median parking, bike lanes, artistic crosswalks and striping, wayfinding signage, etc.
• Plans shall show construction easements that will be necessary from adjacent properties. • Plans shall show the extent of areas impacted within the adjacent impacted properties, such as grading to properly transition new street/sidewalk grades to existing adjacent property grades and any improvements that need to be reconstructed within adjacent properties. These include any relocation/reconstruction of utility service connections, utility boxes, pull boxes, backflow devices, fire service connections, mailboxes, and any other improvements as necessary.
• Deliverables: Preliminary Design Plans, including 30%, 60%, 90%, and final Preliminary Design plans for City review and approval. Final Preliminary Design Plans shall be incorporated into the PDR in the Exhibit section.

Task 5.4 Preliminary Design Specifications
• The Consultant shall prepare Preliminary Design Specifications, including General Provisions (provided by the City), Special Conditions, Supplemental Special Conditions, Technical Specifications, and detailed Bidding Tables, showing Bid Items, Quantities, Estimated Unit Prices and Total Prices.
• Preliminary Design Specifications shall be prepared in accordance with the City of Beaumont Standards, Riverside County Transportation Department (RCTD) Road Improvement Standards & Specification, Riverside County Flood Control Standards, and the Standard Specifications for Public Works Construction, current edition. • The Preliminary Design Specifications shall be incorporated into the PDR in the Reference section.
• Deliverables: Preliminary Design Specifications, including 30%, 60%, 90%, and final preliminary design specification for City review and approval.

Task 5.5 Preliminary Construction Cost Estimates
• The Consultant shall prepare Construction Cost Estimates in the form of Bidding Tables, showing Bid Items, Quantities, Estimated Unit Prices and Total Prices. In addition to Total Construction Cost, estimated cost escalation and contingency factors shall be shown.

Page 1295 of 1893 ends

• Estimated costs/charges/fees shall be obtained from utility companies for the work they will perform.
• Estimated charges and fees by regulatory/permitting agencies shall be shown (if such costs cannot be obtained, assumed costs shall be indicated). • Estimated costs for any ROW takes, construction easements, work on adjacent private properties.
• Estimated costs for soft costs (final engineering, construction management, inspection, materials testing/inspection, etc. shall be shown as a percentage of construction cost, which is generally approximately 20% of construction cost). In summary, the City is asking for a total project budget inclusive of all potential costs. • The Preliminary Construction Cost Estimates shall include any or all associated costs such as materials testing, inspection, etc.
• Preliminary Construction Cost Estimates shall be incorporated into the PDR in the Exhibits section.
• Deliverables: Preliminary Construction Cost Estimates Task 5.6 Statement of Limitations
• The Preliminary Design Report (PDR) shall include a Statement of Limitations section discussing the limitations or challenges of the project. • The Statement of Limitations is a description of each limitation, why it exists, and how it impacts the study's findings. It also considers whether the limitations could lead to further research.
• Consultant shall describe each limitation concisely but in detail, explain why each limitation exists, and assess the impact of each limitation on the PDR's findings.

Task 5.7 Reports and Studies
• The Preliminary Design Report (PDR) shall include an Exhibit section that includes the primary Deliverables of the Scope of Work such as the Preliminary Design (30%), Preliminary Design Specifications, Preliminary Construction Schedule, etc. • Reference material and/or Exhibits shall be incorporated into the PDR after final City review and approval.

Optional Task 6 - Environmental Services
• The Consultant shall provide an addendum to the 2040 General Plan PEIR consistent with section 15164 of the CEQA guidelines, as recommended in the DBRP. A link to the 2040 General Plan PEIR is provided for reference with this RFP. The addendum shall provide sufficient environmental coverage under CEQA for completion of all the proposed work.

Page 1296 of 1893 ends

If additional environmental studies are necessary, the Consultant shall prepare the determination of the necessary level of environmental documentation, surveying, technical studies, and mitigation based on the proposed improvements. • Deliverables: One (1) electronic copy of the draft environmental documents for City review. City comments shall be incorporated prior to the public notification period. One (1) electronic copy of the final approved environmental documents. All preliminary mitigation measures shall be incorporated into the final environmental document.

Page 1297 of 1893 ends

City of Beaumont Agreement #
C25-120
EXHIBIT "B"

PROPOSAL
(insert behind this page)

Page 1298 of 1893 ends

Pr op osal for the City of Beaumont
0)
s
4-•
ti
li •-
0 a `�
N
4a
L
O •�

0. Ce IX
lia
i�A �
O
Co E
a�
0 (T
a a)
I_ co
OS
•- 3
E o
a)
3 a o
fi 0
4 The Power of C ommitment
Technical Proposal I May 13, 2025

Contents
A. Cover Letter 3
B. Introduction/Information
Services Understanding
Subconsultants
C. Firm Profile
Firm Description
Transportation
Road Corridors
D. Key Personnel
Key Personnel Overview
Key Personnel Experience on Past Projects
E. Scope of Services
Scope of Services Overview
Scope of Work Tasks
F. Approach
Project Understanding
Approach
G. Additional Information
Staffing and Managing Tasks Efficiently.

Other Value -Added Services
H. References
References Overview
Relevant Projects/References
I. Resumes
6 8
8 9
10 10
11 16
17 17
19 20
20 29
30 31
37 38
39 40
41 44
ATTACHMENT - Full Scope of Services 58
© GHD 2025: This document is and will remain the property of GHD. The document may only be used for the purpose for which it was commissioned and in accordance with the Terms of Engagement for the commission. Unauthorized use of this document in any form whatsoever is prohibited.

Page 1300 of 1891 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
2 O
Cover Letter
5 The Power of Commitment

320 Goddard Avenue
Suite 200
Irvine, CA 92618
Z -A-\
Cover Letter
May 13, 2025
949.648.5200
www.ghd.com
Raveena Chara I Procurement & Contracts Specialist I City of Beaumont 1550 E. 6th Street I Beaumont, CA 92223 I rchara@ beaumontca.gov
Re: Technical Proposal for Preliminary Design Report (PDR) for the Downtown Beaumont Revitalization
Dear Ms. Chara and RFP Review Panelists:

As the authors of the City's 2024 Downtown Beaumont
Revitalization Plan (DBRP), GHD, Inc. (GHD) is uniquely positioned to carry forward the City of Beaumont's (City) transformative work.

Our team understands the planning vision, technical framework, and community aspirations behind it —and we're ready to translate it into implementable design solutions that will shape a more vibrant and connected downtown.

Our understanding of the PDR effort is clear: this is not a conceptual planning exercise, but a critical technical step toward implementation and obtaining funding. The PDR will be more than a project document - it will be a roadmap to construction. We will refine the priority improvements identified in the Plan such as roundabouts, corridor reconfigurations, pedestrian and bicycle enhancements, and public realm improvements along 6th Street and Beaumont Avenue into a 30% design package that is grounded in engineering, feasibility, cost, and environmental compliance.

The final deliverable will support grant readiness, permitting, and capital programming while also remaining responsive to evolving stakeholder input and coordination needs.

Entrance to Downtown Napa
- Understanding of the Scope of
Services
Our scope of services will include:
- Field investigations (surveying/mapping, utility
research, geotechnical, potholing, drainage, lighting, and traffic analysis)
- Development of design alternatives and 3D visualizations - Preparation of 30% engineering plans, preliminary
specifications, preliminary cost estimates, and phasing strategies
- CEQA strategy and consistency review with the 2040
General Plan PEIR
- Stakeholder engagement, business owner coordination,
and public outreach support
- Grant -ready documentation and GIS/CAD base files

Page 1302 ends

A. Cover Letter 14

4 In -House Comprehensive Services
As a fully integrated team, we provide in-house planning, engineering, environmental, and public engagement services. Project Manager Steven Latino, PE, TE, is located 10 minutes from City Hall and has extensive knowledge of the City, it's past projects, and stakeholders. Steven along with Assistant Project Manager Erin McPherson, PE, will lead a seasoned group of professionals with deep experience in downtown revitalization and complete streets design. The team's previous work in Beaumont, La Quinta, Temecula, Fairfield, Twentynine Palms, and other cities has resulted in renewed, award -winning community revitalizations backed by successful grant pursuits and strong public support 4 Cost Effective, Timely Services and Approach for
the City
Our in-house services enable team members to work nimbly and efficiently, deliver cost-effective and timely services, and maintain quality and consistency without the delays of multi -firm coordination. Steven can develop a process that not only \works for all the stakeholders, but will set the path going forward for GHD. By streamlining communication and approvals internally, we can quickly respond to City requests, evolving project priorities, and stakeholder needs. We are committed to providing exceptional customer service through dedicated points of contact, proactive conversations, and a collaborative problem -solving approach that prioritizes the City's goals, timelines, and budget.

We hereby certify, under penalty of perjury, that GHD complies with all applicable non- discrimination requirements of State and Federal laws. Our proposal is signed by an official authorized to bind GHD contractually.

On behalf of GHD, we are pleased to submit our proposal to prepare the PDR for the City's DBRP. We look forward to continuing our successful partnership with the City and supporting your efforts to bring this community -driven vision to life.

Todd Tregenza, AICP
Principal in Charge/
Mobility & Places Group Leader
Steven Latino, PE, TE
Project Manager/
Client Relations Lead
Contact Information
Eg Project Manager: Steven Latino, PE 1320
Goddard Way, Suite 200, Irvine CA 92618
office 657.622.4920, mobile 951.252.4916
[email protected]
I2 Authorized Person: Todd Tregenza, AICP
Principal in Charge 12600 Capitol Avenue,
Suite 100, Sacramento, CA 95816
916.235.4216 I [email protected]
-) Trusted Teaming Partners
Geocon West, Inc.: Geotechnical Services
Lisa Battiatio, CEG, LEED AP 141571
Corning Place, Suite 201, Murrieta, CA
925621951.304.23001
[email protected]
KDM Meridian: Surveying/Mapping/
UAV I Richard Maher, PLS I Principal 11340
Reynolds Avenue, Suite 110, Irvine,
CA 92614 1949.768.0731 I Richard
Maher <[email protected]
MNS Engineers, Inc.: Traffic Engineering/
Geometrics I Tony Salas I Project
Manager 13850 Vine Street, Suite 110,
Riverisde, CA 925071909.963.62331
[email protected]
T2 Utility Engineers: Utility ResearchI
Glen Robison, PE I Senior Project Manager
15622 Resesarch Drive, Unit A, Huntington
Beach, CA 92649 1714.487.6786 1
[email protected]

Page 1303 of 189 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
5 O
Introduction/Information
4 The Power of Commitment

Introduction/Information
The Downtown Area of the
City of Beaumont (City),
centered around 6th Street
and Beaumont Avenue, is
the heart of the community,
hosting seasonal events and
home to many unique, locally -
owned small businesses.

The Downtown Beaumont
Revitalization Plan (DBRP)
aims to enhance this area by
transforming streets into pedestrian -friendly spaces, improving safety, and supporting local businesses. Key projects include narrowing and reconfiguring 6th Street to balance regional traffic with pedestrian needs, and evolving Beaumont Avenue to serve as both a crucial link between neighborhoods and an event space. Grace Avenue is envisioned as a bespoke pedestrian space with historic features, while the Civic Center and adjacent lands are considered for capital improvements to reshape their role as a community hub. The Plan also includes consistent branding elements such as gateway landscapes and identifying signage to create a cohesive Downtown identity.

GHD's team is experienced in similar projects across California, will deliver constructable designs, and support community outreach through workshops and engagement with local
stakeholders. This collaborative approach aims to ensure the final roadway configurations align with long-term growth and local needs, fostering a sense of local decision ownership and regional interagency buy -in.

Highlighted below and on the following page is our
understanding of the services that will be provided as well as the firm's collaborative teaming partners that will aide in the successful completion of the Preliminary Design Report (PDR) for the City's Plan.

Page 13 ends

Creating Resilient Communnities
Through a Collaborative Approach
GHD is experienced in working with local communities to create innovative, resilient communities that can adapt to environmental, social, and economic challenges. By
collaborating with the City and community stakeholders
together, we can build a
-, . ...
sustainable and inclusive
community -centered
Downtown space that r..,
supports safe mobility,
connectivity, and future
expansion and growth.

N.

B E AUMONT

-)Services Understanding
GHD understands that a PDR typically
includes a project overview, design
objectives, site analysis, conceptual
design descriptions, system breakdowns,
key technical specifications, preliminary
cost estimates, schedule timelines,
risk assessments, environmental
considerations, and a discussion of
potential design alternatives. We have
taken those items into consideration as well
as our the services outlined below.
- Field investigations (surveying/mapping,
utility research, geotechnical, potholing,
drainage, lighting, and traffic analysis)
- Development of design alternatives and
3D visualizations
- Preparation of 30% engineering plans,
preliminary specifications, preliminary
cost estimates, and phasing strategies
- CEQA strategy and consistency review
with the 2040 General Plan PEIR
- Stakeholder engagement, business
owner coordination, and public
outreach support
- Grant -ready documentation and GIS/
CAD base files
A more detailed scope of services write up
is included within Section E.
4 Subconsultants
Highlighted on this page are our teaming
partners that will round out our services
for the City on this project. Teaming
partners were hand selected based on their
familiarity of working on similar projects,
with the City, and ability to provide
efficient and cost effective services.

T T2 Utility Engineers (T2ue) I

4.1-
1 � ttili Y Utility Research
engineersT2ue specializes in
professional Subsurface Utility Engineering
(SUE), utility coordination, and surveying
services. Since 1993, T2ue has provided
professional insight and quality and
reliable data to manage and mitigate
utility risk before construction begins.

Project benefits include reduced redesign
costs, reduced construction delays and
claims, and improved project safety.

T2ue's highly trained SUE teams conduct
utility investigations based on the unique
requirements of each project. T2ue
recommends and use the appropriate
technologies for designating, locating,
and mapping utility data based on project
scope. They provide clients with services
in accordance with the SUE industry
Standard, ASCE 38, or to meet client -
specified, custom needs.

Geocon West, Inc. (Geocon) I
Geotechnical
Geocon is a California
GEOCON corporation that was
established in 1971 and
has over 300 employees. They are a
professional engineering consulting firm
providing comprehensive geotechnical,
geologic, construction inspection, and
environmental engineering and consulting
services. In addition to these services, they
operate in-house soils and materials testing
laboratories and provide environmental
remediation contracting (cleanup) services.

Geocon is fully staffed, responsive,
and sized so that trained professional,
technical, and support staff can respond
quickly to varying task requirements
and multiple concurrent projects. This
is achievable through Geocon's unique
organizational structure that permits
efficient, competent, professional services
for every project, irrespective of the size
or complexity of the task. The firm is has a
Riverside County office located in Murrieta
and the firm's headquarters is located in
San Diego.
1 DM KDM Meridian (KDM) I

MERIDIAN KDM
KDM Meridian is a full -service
land survey consulting firm serving public
and private clients since 2000. With over
25 years of experience, KDM specializes
in GPS and conventional surveying, LiDAR
scanning, aerial mapping, ALTA surveys, and
related services. The firm employs a skilled
team of 20 professionals, including five
licensed surveyors, and regularly supports
public works and infrastructure projects
throughout California. Led by founder
Richard C. Maher, PLS, KDM is known for
technical precision, responsiveness, and
reliable service. KDM is a certified Small
Business Enterprise (SBE) based in Irvine.

MNS MNS Engineering,
Inc. (MNS) I Traffic
Engineering/Geometrics
Founded in 1962, MNS provides quality
infrastructure consulting services to the
transportation, water resources, and
government service markets throughout
California. Specializing in the core
services of engineering, construction
management, land surveying, and planning,
MNS' has been built on clear and direct
communication and quality services.

MNS understands the technical aspects
required for traffic signal upgrades and are
highly experienced with utility and multi -
agency coordination. MNS uses the latest
CADD equipment and technologies to
prepare PS&Es. Engineering and technical
teams stay current with material and
construction method developments as well
as public agency specification and code
requirements. MNS' local office is located
in Riverside.

Page 1306 of 1893 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
8 O
Firm Profile
5 The Power of Commitment

©o
Firm Profile
3 Firm Description
Established in 1928, GHD is a privately -held, multidisciplinary, professional services firm owned by our people and operating across five continents. We are one of the world's leading professional services companies operating in the global markets of transportation, water, environment, energy and resources, and property and buildings. Our people offer decades of knowledge, as well as an understanding of the challenges facing our clients and communities today. We deliver projects with high standards of safety, quality, and ethics. Driven by a client -service led culture, we connect the knowledge, skill, and experience of our people with innovative practices, technical capabilities, and robust systems to create lasting community benefits.

GHD has 5,000+ employees in North America and 12,000+
employees globally. GHD has a long tradition of repeat, local government clients. 90% of our clients are municipal agencies or government entities, and 75% of our work comes from repeat clients.

Committed to sustainable development, GHD improves the
physical, natural, and social environments of the many
communities in which we operate. We are guided by our workplace health, safety, quality, and environmental management systems, which are certified by Lloyds Register QA to the relevant international standards (ISO and OHSAS).
4 Transportation
The issues influencing transportation sustainability today; and, in the future for industry, business and communities, involve a complex array of factors. We understand these issues and their impacts, and we partner with you to deliver solutions appropriate for every project, business, location, and desired social, economic and environmental outcome.
96+ y©n,To in operation
135+ ooaooVo© served
160+ offlic©o worldwide

1.9© USD ToW7oIMIo 2024
5 global ooTB ©
120 poopo
45+ ,©Mod©© lines
L
Providing engineering, environmental, advisory,
architecture, digital and construction services

Page 130 ends

C. Firm Profile 1 10

GHD At a Glance
Company Name: GHD, Inc.

Years in Business: 96+
Organizational Structure: C Corporation
Core Work Areas: architecture I digital
engineering I environmental I construction
planning
Areas of Expertise (for this project):
environment I mobility & places I natural
resources/impact assessment I property &
buildings I transportation (highways, roads,
bridges, rail, transit) I urban design/planning
I water linear infrastructure
Number of Professional Personnel:

Globally: 12k I Nationwide: 2K+ I California:
450+ I Southern California: 150+
Southern California Offices: Irvine I Los
Angeles I Long Beach I Tustin I San Diego
Project Office Location: 320 Goddard
Avenue I Suite 200 I Irvine, CA 92618
GHD has an excellent performance record
with municipal and government agencies
throughout California. Many of GHD's past
and current projects include the following:

Civil engineering
Transportation planning/design
Complete streets and streetscape
planning/design
Active transportation planning/design
Roundabout planning/design
Landscape architecture/wayfinding
GHD is at the forefront of endeavors to
secure a sustainable, safe, accessible, and
efficient transport network in a future of
greater autonomy and flexibility.

We believe that transport is about the
movement of people, not vehicles. We are
driven by the belief that as our cities grow,
and as demand for movement increases,
there are always better ways of doing
things.

To help realize the vision of fully integrated
and effective transport networks, our team
offers the full range of technical and
strategic skills required to shape the future,
including:

Active transportation, bicycle, and
pedestrian advice
Demand management
Freight planning and advice
Integrated land use, transport advice
and studies
Parking strategies, analysis, and advice
Pedestrian simulation and traffic and
transport modeling
Public transport infrastructure ands
service advice
Road safety audits and analysis
Strategic route planning and
feasibility studies
Traffic engineering assessments
and advice

Page 1309 of 18 ends

- Traffic impact assessments
- Transport strategies
- Travel behavior change
- Urban revitalization transport advisor
Seamless integration - both between
modes, and transport and the public realm
- is the future of a successful society, and
we seek the best outcomes for our clients
and for communities to realize this vision.

Road Corridors
Our teams provide services in planning,
design, construction management and
maintenance of all elements of the road
corridor including highways, complex
interchanges, toll roads, bridges and
tunnels.

We understand our clients' challenges and
apply imaginative thinking to deliver the
optimum outcome to achieve lasting
community benefit.

For more than 70 years, GHD has planned,
investigated, designed, and delivered
innovative road systems in urban and rural
environments in many parts of the world.

Road systems design involves a
collaborative vision and approach by a
team of competent planners, engineers and
scientists. From planning and procurement
through to feasibility, investigation, design,
construction support, delivery and
maintenance. Our clients enjoy
personalized solutions for roads that
incorporate master planning, funding and
economic analysis, transport planning,
asset management, environmental
management, risk management and more.

Work has included rehabilitation, expansion,
development rehabilitation, and
construction of new highways, complex
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
11 Enhanced Roadways in
California
GHD has delivered numerous roadway
improvement projects throughout CA
including complete streets, roundabouts
and downtown revitalizations, and
intersections.

SAMPLE PROJECTS
Complete Streets:

Artesia Great Boulevard Complete Streets I Long Beach
Avenue 64 Complete Streets I Pasadena
Broadway Avenue Complete Streets I Long Beach
Imola Avenue Corridor Complete Streets Improvement
Plan I Napa
La Quinta Complete Street, Road Diet, ATP I La Quinta
Milpas Street Crosswalk Safety and Sidewalk Widening I
Santa Barbara
• Shoreline Drive Realignment I Long Beach
• West Texas Complete Streets I Fairfield
Roundabouts:

Avenue 52 at Jefferson Roundabout Roadway/Safety
Improvements I La Quinta
De Portola/Jedediah Smith Roads Roundabout I Temecula
Rocklin Road Complete Street Roundabout I Rocklin
Tank Farm/Orcutt Roads Roundabout I San Luis Obispo,
Twin Cities Road Roundabouts I Galt
Downtown Revitalization/Roadways
• Downtown Revitalization Plan I Beaumont
• Downtown Revitalization/Street Circulation/Community- Based Transportation Plan I Redding
Downtown Specific Plan I Twentynine Palms
TAMC South Salinas PSR-PDS I Salinas
Intersections/Interchanges
5 -Way Intersection Improvements PSR-PDS I Napa
I-710 Transitional Projects I Pasadena
SR 121/8th Street East Intersection Improvements I
Sonoma County
SR 29/SR 221 Interchange, Soscal Junction I Napa
County
interchanges, roundabouts, toll roads,
bridges and tunnels. Our planners and
engineers provide integrated services to
plan, design, construct, revamp, maintain
and manage all aspects of the road corridor
life cycle.

GHD's road systems teams are able to
respond to projects that range from an
urban or rural intersection design to multi-
billion dollar complex highways and
freeways both at, above and below ground
level. Our depth of experience and diverse
skills base ensures that we provide the right
team to deliver the best project for our
clients.

We are innovative and flexible in our
approach to managing and delivering
our projects. We are able to work
independently or in collaboration with other
design teams, alongside clients and
contractor teams either in our offices
or dedicated project offices to suite the
project needs.

Our services include:
- Planning: Master planning, transportation,
traffic and strategic route planning,
bicycle and pedestrian planning studies,
roundabout planning studies, road safety
audits, parking and corridor studies, and
procurement strategies
- Feasibility: Economics, concept design,
roundabout feasibility studies, financing,
environmental appraisals, funding
options and grant preparation/grant
assistance Investigation - Geotechnical,
risk and option analysis, surveys,
estimates, geological assessments,
foundations, contract documentation and
tender evaluation
- Design and engineering: Geometric
design, roundabout design, structural
advice and design, bridges, tunnels,

Page 1310 of 18 ends

tollways, signals, Intelligent Transport
Systems (ITS) and pavements
Construction: Project, risk and tender
management, procurement, design and
construct owner's agent and alliances,
engineering construction support
Maintenance: Network, asset and
life cycle management, systems/
process pavement management and
deteriorating modeling
Our clients appoint GHD for their
technically challenging projects as our
people are well skilled and abreast of latest
developments in their areas of expertise.

The engineering design and digital world
is rapidly changing and with the advent
of new design tools, big data, including
Building Information Management and we
continue to stay abreast with the latest
innovative design tools and software to
secure our future and provide value for
money efficient design.

Main Streets/Complete Streets
GHD provides urban planning, transportation
planning, and engineering to private and
public sector clients around the world. With
local intelligence and global perspective, we
offer clients the ability to develop aworking
relationship with the responsiveness and
focus of a local office with the award -winning
breadth and depth of a major international
consulting firm.

Avenue 64 Complete Street in Pasadena, CA.

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
12 Complete streets design can lead to better
safety, functionality and accessibility, as well
as opportunities to preserve open space and
implement `Green Streets' elements such as
capturing, cleaning, and retaining stormwater
within the upgraded corridor.

We've been refining our approach to
complete streets through innovative and
creative solutions that integrate all modes of
travel into the roadway prism. Our team
verifies that roadway sections reflect
appropriate widths for complete street
elements to minimize or eliminate R/W
impacts and optimize the corridor's
functionality for all modes of transportation.

We provide design services for the following
Complete Streets elements:

Road Repurposing: repurposing the
existing roadway by reducing the number
of vehicle travel lanes is a common means
to create room within the existing corridor
to accommodate Active Transportation
provisions and balance the needs of all
corridor users.

Traffic Calming: various measures of
traffic calming such as reduced roadway
sections, roundabouts, curb extensions,
median islands and pedestrian refuges.

Bicycle Facilities: bicycle trails, buffered
bicycle lanes, separated/protected
bicycle lanes, bicycle signals and signal
priority, green colored pavement markings
and conflict locations, bicycle boxes at
signalized intersections, bicycle parking
and stalls, bicycle detection loops, rumble
strips, bicycle friendly grates and rails,
and bicycle friendly light rail or train
track crossings
Pedestrian Facilities: sidewalks, ADA
related elements, crosswalks, high visibility
crosswalks, crossing islands, pedestrian
activated traffic control devices, curb
bulb outs, lighting ,shade structures and
street furniture.
- Shared -Use Facilities: Shared -use paths,
roundabouts, intersection treatments for
bicycles and pedestrians, grade separated
(overpass or underpass) crossings and
improved signage and pavement markings.

Transit Facilities: Transit stop
improvements, park and ride facilities,
transit boarding islands, bus build -outs,
new transit stops, transit signal priority,
transit -only lanes, light rail transit, and
real-time traveler information.
- Landscaping Green Infrastructure,
and Stormwater Management: includes
landscaping of buffer areas or open
spaces, shade landscaping, bio filtration
swales, infiltration trenches, rain gardens
and drought tolerant plants.
- Grant Applications: writing successful
grant applications for various local
agencies to obtain funding for
active transportation and complete
streets projects.

As part of our designs, we are able to provide
all associated support services such as
survey, traffic engineering, R/W, utility
relocation, public outreach, geotechnical,
environmental, traffic control and landscape
design. Our capabilities span the planning
and preliminary design stage through to
final engineering/contract documents and
construction support services. Additional
relevant services include:
- Community
outreach/stakeholder engagement
- Connectivity analysis
- Green infrastructure
- Placemaking services
- Implementation strategies
Active Transportation Planning
GHD's team helps create active, connected
communities where bicycling and walking
are part of a healthy lifestyle and sustainable
transportation system. We have considerable
experience assisting local agencies with
planning and creating bicycle and pedestrian
infrastructure and providing safe, efficient,
and accessible connectivity for local
communities and regional networks. In
addition, our transportation professionals
bring experience from planning and funding
through design and construction, giving us
the ability to craft actionable, feasible plans
that the City can implement.

Pedestrian and Bike Network
Design
From the perspective of someone biking,
jurisdictional boundaries are often irrelevant
and seamless. Continuous routes are
essential. Similarly, the active transportation
network is not independent, and must be
designed in the context of a multimodal
transportation system and an evolving built
environment. The Project will recommend
bicycle facility connections to urban areas
that create a continuous riding experience.

Preliminary Engineering (PE) and
PDR Services
GHD has robust experience delivering
streetscape projects from concept
to construction. Having a team that
knows what it takes to set a project
up for successful grant funding and
implementation is key to a successful
project. A recent example of this is Lindsey
Van Parys and Todd Tregenza's success
with the City of Pasadena. Todd led the
planning effort of the I-710 Transitional
Project for the city. Lindsey, along with
Todd helped with concept development
and analysis. This document was then used
to secure funding through LA Metro, which
the city is now implementing pieces of that
plan. So far four of the identified projects

Page 1311 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
13 have funding and will move to the next
phase of work.

Future Communities
While the concept of "community" is simple
and universally understood, communities
are inherently dynamic systems, and we are
mindful of local challenges impacting the
physical and economic realms they occupy.

Because no two communities are the same,
our mission is to address the qualities that
make communities unique and enhance
them to support our clients' strategic vision
and community members' values. GHD's
collective term for this integrated
Initiative is called "Future Communities." It is
part of a strategic trio of enterprise -wide
organizational principles. By connecting
our capabilities in urbanization and asset
management across G HD —architects, urban
designers, scientists, engineers, planners
and economists working across our global
network —our multidisciplinary teams are
able to address the most unique and pressing
challenges of communities globally. From
dense cities to rural towns, our experts work
together across typologies, geographies, and
markets to help our most valuable clients lay
the foundation for future success.

Loveable Places
GHD Loveable Places helps to plan and
design places that people want to live in,
visit, spend time in, and travel to —places
people love. This goes beyond new bike
lanes, storefronts, or landscaping - this
approach seeks to understand how people
experience getting between places they
love, how safe they feel, their social
interactions, and developing a plan that
aligns with a community's "place identity" and
"people's experience."
"Place identity" celebrates the uniqueness
of each place. Just like culture shapes
an individual, a unique heritage, and
history shapes a place. Place identity is an
association, the image that springs to mind
when thinking of somewhere. Whether that's
a desire to maintain a small town charm,
celebrate diversity, or highlight recreational
opportunities.
"People's experience" celebrates the lived
reality of a place. We are all different,
experiencing our towns in dynamic and
contrasting ways depending on the time
of day, the season, or our reason for being
there. Our experience also changes with
time. What we experience in a place as a
year-round resident is different than how we
experience it as a visiting tourist.

Loveable Places applies various indicators
and dimensions that measure "loveability."
These are applied in a multi -criteria analysis
to help select and prioritize projects.

These are also used to generate positive
community energy from the start of a
project. We start with a community
engagement strategy that asks the following
questions:
- What do you love?
- What do you wish for?
- What do you wonder?
This approach stands in stark contrast to
traditional outreach efforts that often begin
by asking people where their "pain points"
are - where they have concerns about
safety, or traffic, or connectivity. By starting
our conversation with the community in a
positive manner, we initiate a constructive
self -reflection on what people love about the
City already, what they'd like to see more of,
and then reflect on the future vision.

Community Outreach
We believe community engagement is the
core and the foundation of successful
planning efforts. Plans that fail to seek out,

Page 1312 of 18 ends

understand, and respond to the needs of
the community end up gathering dust on a
shelf or encountering passionate opposition
during implementation. Plans that place
community engagement at the center of the
project, however, can foster collaborative
partnerships and catalyze transformations
that bring residents' vision to life. Our team
has significant experience facilitating
successful community engagement
programs that include multilingual
engagement, prioritize reaching members of
disadvantaged communities, and is familiar
with many of the community groups in
Beaumont through our work on past and
ongoing projects in the city.

GHD community engagement for the DBRP.

For this Project, we understand the City's
priority is to engage the community in a
meaningful dialogue throughout the planning
process, establishing community buy -in for
proposed improvements, and document an
inclusive and broad process for future grant
applications. GHD will lead the engagement
strategy. We pride ourselves on our ability
to couple community and stakeholder input
with our urban design, active transportation,
and engineering experience to develop
concepts that communities embrace, are
visionary, and are technically feasible. This
approach is a powerful and cost-effective
way to engage with residents, business and
property owners, and other stakeholders.

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
14 Our team knows from our prior work that
Beaumont is home to many local groups that
are passionate about their neighborhood
or interest, are deeply invested in their
community, and are fiercely committed
advocates. Engaging these groups early in
the project will be essential to learn about
their priorities, respond to concerns, and
allow residents to feel their needs are heard
and reflected in the final plan. Where groups
have competing needs or interests, early
engagement will allow for informed
discussions so that residents are empowered
to participate in decision -making, influence
the balancing of multiple priorities, and feel
ownership over the resulting PDR.

We are confident and experienced in
facilitating both in -person and on-line
community engagement, including
workshops, focus group or advisory
meetings, and interactive virtual platforms.

We use a variety of web -based tools on our
projects, customized to local needs and
preferences, and understand that not all
tools work in all communities. Working with
our clients, we adapt our methods to meet
local needs and preferences as well as
achieve deep and robust engagement.

Communicating the availability of different
feedback methods is critical, and listening
to the community on how they would like
to be engaged is also vital to the project's
success. In each project, virtual engagement
methods are a supplement to, and not a
replacement for, direct engagement such
as pop-up tables at existing community
events, presentations at existing community
meetings, and workshops or focus groups.

Our Urban Design Lead has led dozens of
design workshops in communities across
California and is committed to crafting a
schedule that allows for transparency and
a charrette environment that encourages
meaningful engagement that can directly
influence design outcomes.

Responding to Agency
Requirements
Our team understands that local agencies
are under increasing requirements at the
local, regional, and state levels. Cities like
Beaumont are seeking to develop complete
streets networks to meet the needs of
residents, as well as develop active
transportation infrastructure to meet local
needs and fulfill regional funding
requirements. In addition, greenhouse
gas and vehicle miles traveled reduction
targets are an important focus of
transportation planning efforts, requiring
a deep understanding of the day-to-day
transportation needs of residents to develop
solutions which will shift trips from driving to
walking, bicycling, and transit. Our diverse
experience in planning, engineering, and
analysis will support development of
recommendations that are strategically
targeted to advance agency objectives and
meet applicable standards, as well as aligning
with competitive grant funding guidelines to
position the City to pursue implementation.

Grant Funding
Stable funding systems are needed to
achieve the City's goals and promote
prosperity in the community. GHD has a long
history of successfully obtaining grant funds
for both municipal and private projects,
including the Caltrans ATP, which would
offset the financial impact to rate payers.

We are experienced in identifying funding
and matching it with project needs. We have
the in-house capacity to create competitive
grant packages and the skills necessary to
design, engineer, and develop your project.

Our team routinely monitors the grant cycles
of numerous state, federal, and private
grants.

Visual Modeling Software of Final
Corridor Concepts
GHD can produce high -quality, realistic
renderings and data visualizations and
for translating transportation -speak into
conversational language, all of which makes
for graphics and plans that members of
the public can easily understand. Our team
is skilled in preparing photo renderings to
depict before and after design treatments,
developing artist renderings and design
visualizations, and bringing fully realized 3D
scenes to life as animated videos and
interactive experiences.

S.:)rtiple vi a AI provided by GHL coy icrt:

Managing a Multidisciplinary Team
Our in-house team includes planners,
engineers, urban planners, and landscape
architects working side -by -side to provide
local and regional networks. Traffic engineers
are skilled in impact analysis, VMT analysis,
and signal design. Because we provide all
services in-house, we develop ATPs that
balance bicycle and pedestrian needs with
other factors, including transit access,
commercial activity, and vehicle circulation.

The end result is a project that advances
active transportation with broad community
support and one that is constructible.

Our experience spans the entire project
development process, from planning
documents such as bicycle master plans,
through PS&E and the construction phase.

Page 1313 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
15 >>o
Key Personnel
5 The Power of Commitment

Key Personnel
- Key Personnel Overview
Our team is truly an integrated, customized team designed to leverage previous experience with the Plan and the experience of our technical resources to meet the needs of the City. The team presented in the organizational chart indicates the roles and hierarchy so that it is clear to all involved how work is communicated, from subconsultants through our Project
Manager, and the QA/QC. As the Principal in Charge, Todd was involved in the approved Revitalization Plan, supported by a deep bench of resources and a Project Manager who has been
performing work in the region for over 21 years. In addition, our Project Manager is only a 10 -minute drive from City Hall, and can be available at a moments notice.

GHD's approach to this setup is to provide continuity and efficiency and optimize value and maximize benefits to the City.

Additionally, as part of our commitment to expand our award - winning team, GHD continues to add new and localized staff to the Inland Empire region. Please refer to Section I of this document for detailed resumes of all key team members working on this project. We are committed to keeping the same project team we are proposing for the life of the project. Should an unexpected change result in a key team member being
unavailable to serve the City on this project, we are backed with the resources of a global network. No changes will be made to the project team without consent of the City.
-}Key Personnel Experience on Past
Projects
We have chosen our key team members based on their project understanding, relevant experience, and technical skills required for this project. Team members have worked on many types of roadway improvement projects from downtown revitalizations and streetscapes to complete streets, roundabouts, roadway

Page 1315 of 18 ends

TECHNICAL ADVISOR/QA/QC
Lindsey Van Parys, PE, QSD/P

BEAUMONT
-CALIFORNIA-

PRINCIPAL IN CHARGE
Todd Tregenza
ASST. PROJECT MANAGER
Erin McPherson G-.

TECHNICAL SERVICES SUPPORT TEAM
Engineering
Michael Pitcock, PE CD —
Christine Provo, PE
Traffic Engineering
Byung Lee, PE, TE *-
Tony Salas i
Geometrics
Hector Salcedo, PE 4 *—
Brandon Reyes, PE i
Hydrological/Drainage Assessment
Erik Fanselau ®—
Environmental
Nicole Greenberg 0 —
Urban Design
Jonathan Linkus, AICP, LEED AP 0 —
Roundabout Design
Ronald Boyle, PE "—
Landscape Architecture
Lucas Piper, PLA, QSD/P
Public Outreach
Yosef Yip
Surveying/Mapping/UAS
Keith Klaggge, PLS 2
Patrick Earl, PLS 2
Geotechnical
Lisa Battiato, CEG, APM, LEED AP 3
Andrew Shoashekan, PE 3
Utility Research
Arthur Robison, PE 4
Key staff. Subconsu/tants: 1. MNS Engineers, Inc.; 2. KDM Meridian; 3. Geocon West, Inc,; 4. T2 Utility Engineers. Other staff resources available in each service category, as needed.

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
17 modifications for ADA compliance, and References section as well as some major intersections and interstates. Please additional projects for crossover with see the chart for key team members resumes.
experience on the projects listed in the
).
r - h
'- *
_
i r. �
>,
l
; ;
_
, Alr, _ y�i
s

KEY PERSONNEL RELEVANT EXPERIENCE

PROJECTS
CO
> 3
c
2i
c
0 O
c6
m
CD
E
0 CD
CO
5 co
O
CI
J
2 2
CU
E
O
N
CO
o
O
O
Cn
_c
-
-
N
d
o
o
O
c
O
N
N
c
Q
c
o
-
E
c
N
eL
CO
CSI
C!)
OS
Q
o
o
o
E
T,,
O
c
O
N
H
H
o
o
U 5
_
m ci-
> E
O
O
,, cod
a>
Q Q
C=
U
4`=
a
C
2 c
E
Cj
O
p
E
O
o
ec
5 U
CB
43 o
�'
Cu
1 O
L
N
.g
O
Cn
fl-
E
U
>.
4 CO
LO
V) CE
W
.�
I---
2 O
CD
72 LL
T
7 m
LI-
m
_�
to
`,
i.-
C
O
m
poi
s �
'
iin
waif ter.
c,
g ;a.

lei

4. r y "

1.1'
4 c �. j TF
r t
1 I
.tom l - . )F. ;,
w
.C
_ ,�J !
..
5 •-
Steven Latino, PE, TE (GHD)
J
J
J
J
Lindsey Van Parys, PE, QSD/P (GHD)
,/
J
J
J
T
J
J
J
J
J
J
J
Todd Tregenza, AICP (GHD)
J
J
J
J
./
J
Erin McPherson, PE (GHD)
J
J
Michael Pitcock, PE (GHD)
Byung Lee, PE, TE (GHD)
ii/
ii/
J
J
Hector Salcedo, PE (MNS)
Erik Fanselau, PE (GHD)
J
J
J
Nicole Greenberg (GHD)
J
Jonathan Linkus, AICP, LEED AP (GHD)
%/
%/
J/
%/
Ronald Boyle, PE (GHD)
N/
%/
J/
i/ i/
J
J
Lucas Piper, PLA, QSD/P (GHD)

Page 1316 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
18 O
Scope of Services
The Power of Commitment

o
Scope of Services
Scope of Services Overview
To meet the requirements of the Request for Proposal (RFP), we have abbreviated our scope of services in this section. Howev- er, our full scope of services with deliverables and assumptions included is provided in an attachment section at the back of the proposal. Considerable time has been taken to meticulously craft this scope, ensuring that our team has prepared a "right - sized" scope aimed at delivering a final product that will set the City up for successful grant applications. Our goal is to clearly convey the need and the proposed solution to stakeholders, decision -makers, and the community.
+Scope of Services Tasks
Task 1: Project Management
GHD will be responsible for the general project management, project coordination, monitoring project progress for adherence to schedule and budget, reporting project progress and
administering the project, including interfacing with the City of Beaumont and the various project stakeholders. More
specifically, GHD will:

Subtask 1.1: Quality Management
GHD will prepare a Quality Management Plan (QMP) that
will generally follow the current Caltrans QMP guidance and template. GHD will conduct Quality Assurance and Quality Control (QA/QC) for the project and conduct QA/QC reviews of all documents, including documents prepared by our teaming partners throughout the project. It is assumed one draft QMP will be prepared, comments will be addressed, and the report will be finalized by GHD and the City of Beaumont.

Perfect Balance of City Familiarity and
a Comprehensive Understanding of the
PnR Process
The differentiating strength of our team is the perfect balance of intimate familiarity with the City and a comprehensive understanding of various aspects of the PDR process. Our team has established a proven record of working cooperatively with City staff, community stakeholders, and City residents to develop and sustain the DBRP. Furthermore, our team has replicated this scope and approach to successfully complete streets, roundabouts, ATP, multimodal corridors, feasibility studies, and the full range of other transportation planning and engineering for numerous local and regional agencies throughout California.

Page 131 ends

E. Scope of Services 120

Subtask 1.2: Project Management
and Administration
This task will include the supervision and
scheduling of project staff, review of work
prepared by GHD staff and subconsultants,
project coordination, client liaison, and
schedule and budget monitoring.

1.2.1: Project Management and
Administration
Upon Notice to Proceed (NTP), GHD will
prepare a Project Management Plan (PMP)
that will include a detailed scope, schedule,
and budget in accordance with the final
signed contract. The PMP will detail
communication and data sharing processes
as well as the data collection, engagement,
and analysis tasks. The PMP will also
specify mapping outputs and templates for
project deliverables. The PMP schedule
will note major milestones, deliverables and
meetings, and estimate engagement events.

While this is an added step in the
project management process, our prior
project experience shows that having
this document enhances the effective
management of the project from both our
and our clients' perspectives.

To be more efficient with the City's partner
agencies' resources, GHD recommends
identifying a Project Development
Team (PDT) that will include the City's
project manager, representatives from
other City departments, and other
stakeholders identified by the City and
GHD. The PDT will be incorporated into
the project administration as needed. PDT
development and engagement is described
in Task 1.3.1 below.

GHD will manage the preparation of
invoices and progress reports monthly. The
monthly progress reports will summarize
budget, schedule status, and identify any
project issues requiring attention by the
City. Other project management activities
include coordinating meetings, scheduling
and managing staff, and overseeing the
quality assurance effort.

GHD will monitor work progress and budget
expended against the level of completion
from the original task assignment.

1.2.2: Meetings and Coordination
GHD's Project Manager, relevant lead, and
select team members will organize and
attend the following meetings (held virtually
unless otherwise noted):
- Project kick-off meeting held in -person
at the City with GHD leadership, including
Lindsey Van Parys, Steven Latino, Erin
McPherson and Todd Tregenza
- PDT meetings with the City, and other
agency/stakeholder representatives,
which will be scheduled to be conducted
once per month (our scope assumes
17 meetings)
- Bi-weekly 30 -minute check -in meetings
with City staff (our scope assumes 34
bi-weekly check -ins)
GHD will coordinate, schedule, and
facilitate meetings, which includes
preparing PDT meeting notes and project
schedule updates. GHD staff will provide
meeting agendas with a minimum of two
(2) working days prior to meetings. Draft
meeting minutes will be submitted within
three (3) working days following each
meeting. Within three (3) working days of
receiving City and stakeholder's comments,
these comments will be incorporated and
final minutes published for distribution and
record.

Subtask 1.3: Community and
Stakeholder Engagement
Subtask 1.3.1: Stakeholder Engagement
Plan and Stakeholder Database
Our team will develop a comprehensive
Stakeholder Engagement Plan (SEP)
to support the project and generate
meaningful input from key stakeholders
within the project area. The SEP will
describe the engagement goals, propose
engagement tactics, timeline, and
stakeholder audience. The SEP will act as
a flexible blueprint, ensuring proactive and
strategic stakeholder engagement. It will be
responsive to the project's needs, allowing
for adjustments in approach if certain
stakeholders and community segments
are not being adequately reached. At a
minimum, the engagement plan will identify:
- Engagement goals
- Overall engagement timeline
- List of stakeholder audience and their
level of involvement
- Project messaging and
communication strategy
- Proposed list of engagement tactics
and activities
Our team will also maintain a stakeholder
database, building from our previous
experience with the DBRP. The database
will comprise of the City as well as key
stakeholder groups within the project area
including civic groups, local community -
based organizations (CBOs), regional
institutions, public agencies, residents,
businesses, and mobility advocacy groups.

The database will also include relevant
departments for all regional partner
agencies. GHD will facilitate an "opt -
in" campaign to gather and update the
database throughout the project.

Page 1319 of 180 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
21 1.3.2: Project Collateral, Templates,
Outreach Notifications and
Communications
Our team will develop a project style
guide that includes a logo, color palette,
fonts, and other key document design
elements that can be applied to outreach
materials, fact sheets, website content,
digital/social content, and project reports
and presentations. GHD will also develop
a template for project related PowerPoint
presentations.

Our team will develop the following
outreach notification and communication
material. GHD will be responsible for the
design of collateral. For printed materials,
GHD will provide digital files to the City for
plotting, printing and/or physical mailing.
- E-blasts/Meeting Invitations: Our
team will use e -blasts to engage
stakeholders listed in the project database
leading up to public workshops and
stakeholder meetings.
- Fact Sheet and Workshop Flyers: Our
team will design a project fact sheet and
two flyers to provide an overview of the
project and promote attendance at public
workshops.

All materials will ensure accessibility,
including translation to Spanish.

1.3.3: Engagement Activities
As mentioned above, our team will create
an engagement strategy that aligns with
the project's engagement goals, such
as garnering project support, soliciting
feedback from key stakeholders, and
understanding operational needs and
concerns. The engagement strategy
will also include proposed engagement
activities to achieve the engagement goals,
subject to City approval, GHD will facilitate
up to two (2) focused workshop/interview
with key stakeholders (i.e. businesses,
property owners, community -based -
organizations), up to two (2) pop-up events
at high -traffic local events/locations, and
up to two (2) board/public presentations
(i.e. City Council, Planning Commission,
or advisory meetings). All activities are
assumed to occur virtually.

GHD will work with the City to plan all
logistics including venue coordination and
set up and will coordinate with the project
team to support the development of
workshop materials and summaries.

Task 2: Data Gathering and
Analysis
Under this task, data and information will be
collected and planning level base mapping
will be prepared. GHD understands that
the City is expecting the work plan to
incorporate the collection of any required
data not already available.

Subtask Task 2.1: Existing Data
Collection
GHD will collect readily available project
and location data. The types of information
collected will include:
- Photos, observations, and features based
on a field review
- GIS data
- Existing planning and
environmental studies
- Regional plans
- City general plan
- Previous traffic forecasts
- Previous conceptual design drawings
- Existing mapping
- As -built plans
- Utility maps
- Record improvement drawings
and reports
- Floodplain mapping

Page 1320 of 18 ends

- SWITRS collision data
- City collision data (Crossroads database)
- Right-of-way (R/W) mapping and
monument records maps
Subtask 2.2: Field Investigations
In addition to collecting all the above -
mentioned data, our team will conduct a
site visit to investigate existing conditions.

During this visit, the team will bring a smart
level and check existing ADA improvements
to identify any deficiencies that may need
to be addressed .

Subtask 2.3: Environmental Review
- Review and analyze all relevant planning
and design documents provided by the
City, including previous studies, planning
efforts, and community vision plans.

Conduct a detailed review of existing
land uses and environmental constraints,
including an overview of the project
under CEQA, to identify items that may
impact future development. Evaluate the
following key reference documents:
• DBRP - Elevate 2025
2040 General Plan Program
Environmental Impact Report (PEIR)
General Plan and Downtown Zoning
Ordinance
Identify gaps, inconsistencies, or areas
requiring additional analysis to inform
PDR development.

Evaluate potential permitting challenges,
policy conflicts, and mitigation needs from
an environmental planning perspective.

Task 3: Investigations
Subtask 3.1: Survey and Centerline
Control
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
22 3.1.1: Aerial Photogrammetry & Base
Mapping
GHD's survey team, KDM, will perform
aerial photogrammetry using either manned
aircraft or UAVs to capture detailed images
of downtown Beaumont streets and
corridors. The mapping will be conducted
at a scale of one (1) inch = 40 feet, with a
contour interval of one (1) foot, covering
the entire public R/W plus an additional
10 feet beyond it. All streets and alleys
within the designated project area will
be included, with an option to exclude
alleys if necessary. The orthorectified
color aerial imagery will be processed and
delivered at a 0.2 -foot pixel resolution,
making it suitable for use in renderings
and stakeholder presentations. This
comprehensive approach ensures high -
quality, detailed imagery and mapping data
for the project.

3.1.2: Survey Control & R/W
Survey control and R/W include three
key tasks: establishing ground control for
photogrammetric processing, surveying
existing centerline monumentation, and
delineating and depicting center lines
and R/W lines. Initially, ground control
points will be set up to ensure accurate
photogrammetric processing, aligning and
scaling aerial imagery to the correct
geographical coordinates. Following this,
sufficient existing centerline
monumentation will be surveyed to
reestablish the record centerline alignment
of mapped streets, ensuring alignment with
historical records. Finally, center lines and
R/W lines will be delineated and depicted
from record documents on the base
mapping, without the need for obtaining
title reports. This comprehensive approach
ensures precise and reliable mapping and
surveying results, essential for planning,
development, and legal purposes.

Subtask 3.2: R/W Analysis
GHD will perform a comprehensive R/W
Analysis based on the information
collected from the Topographic Survey
and Centerline Control. This analysis aims
to identify the existing R/W and proposed
R/W boundaries within the project area.

Subtask 3.3: Utility Research
(T2UE)
T2UE will utilize the Cl/ASCE 38-22
standards for collecting and depicting
subsurface utilities. This approach will help
build a comprehensive utility model of the
project site. Generally, the investigation will
provide Quality Level D and C with some
Level B to be collected in key locations.

This scope includes R/W to R/W along
Beaumont Avenue and East 6th Street,
approximately 10,000 If.

T2UE will generate record requests
to the various utility companies using
Underground Servicer Alert Design Ticket
Request Systems, track correspondence
and create records, file electronic drawings,
create a utility base map, and depict
overhead facilities.

Subtask 3.4: Geotechnical
Investigation
Geocon will undertake a comprehensive
geotechnical investigation as part of the
Downtown Beaumont Revitalization project.

This investigation will include reviewing
available geologic and as -built information,
performing site reconnaissance, and
coordinating with City representatives
and GHD for encroachment permits and
boring locations. Geocon will hire a drilling
subcontractor to drill up to sixteen (16)
geotechnical borings at various locations
within the project area, ranging from
5 to 20 feet deep. Soil samples will be
collected for laboratory testing to evaluate
pertinent physical and chemical properties.

The findings will be compiled into a
preliminary geotechnical report, which will
include boring logs, geologic conditions,
laboratory test results, and preliminary
recommendations for project planning and
design.

Subtask 3.5: Hydrological/Drainage
Assessment
As part of the PDR, GHD will prepare
a preliminary drainage design and
floodplain assessment of the proposed
improvements. The results of this analysis
will be summarized in the PDR narrative.

Detailed calculations will not be performed
until a preferred alternative is selected and
the design is advanced to the 65% level.

The analysis in this task will include the
following:
- Site visit to review the existing drainage
system.
- Review of existing facility information such
as drainage facility maps, as-builts, etc.
- FEMA floodplain determination and
analysis of impact to the project, if any.
- Determination of applicable drainage and
water quality design standards including
peak storm event requirements, likely to
include both the 10- and 100 -year events.
- Determination of location of receiving
system for the project drainage.
- Initial assessment of the tributary areas
for both onsite and offsite runoff.

Identification, to the extent possible, of
any known problems.
- Discussion with City staff regarding
existing drainage system issues.
- Development of the proposed design
methodology for final design.

Page 1321 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
23 Subtask 3.6: Traffic Studies and
Assessments

3.6.1; Gather Existing Conditions Data
GHD, in partnership with the City's team,
will work together to assemble Geographic
Information System (GIS) and multimodal
transportation data. This includes compiling
and reviewing existing transportation, land
use, and mapping data for the project area.

GHD will also gather available traffic volume
data provided by the City, Caltrans, and
relevant traffic information that is available
on SWITRS and TIMS. The information
collected under this task will be used to
prepare GIS figures that clearly present the
data.

GHD will use a combination of field data
collection and past document review
to better understand issues related to
active transportation along the corridor.

Maps showing existing and proposed
classification maps for the study corridor
will be assembled. GHD also maintains
access to the Replica platform, which
provides derived mobility information
such as travel origins and destinations, trip
purposes, and trip modes from anonymized
mobile sources. This information will
be available to enhance field -collected
information and outputs from the available
travel demand models with "big picture"
real -world travel information. GHD will
prepare an existing conditions memo which
will include a description of the corridor,
multimodal facilities, collision history and
identify any deficiencies.

3.6.2: Design Year Conditions
For this study, GHD will obtain the most
current version of the relevant Travel
Demand Model (TMD). GHD will review the
current and future land use assumptions,
both within the project area. Additionally,
GHD will verify the highway network
coding within the project study area for
the existing and future year networks to
ensure that they are consistent with future
year circulation and land development
assumptions.

Opening Year forecasts will also be
developed using straight line interpolation
between Existing and Design Year volumes.

3.6.3: Transportation Operations
Traffic operations will be performed for all
modes of travel for the Existing, Opening
Year and "No -Build" conditions. Although
Highway Capacity Manual 6th Edition
provides multimodal level -of -service
(MMLOS) methodologies, the analysis steps
are relatively data -intensive and may yield
counterintuitive results. GHD proposes the
Plan instead focus on assessing level of
traffic stress (LTS). LTS, as developed by
the Mineta Transportation Institute and San
Jose State University, quantifies the level of
discomfort experience by bicyclists based
on the speed and volume of traffic, their
separation from vehicles, and frequency
of conflict points on roadways and through
intersections. GHD will document bicycle
and pedestrian LTS along the corridor, and
through each study intersection, before
and after improvement. The resulting LTS
maps and analysis can be used to evaluate
proposed concepts for their ability to
improve safe non -motorized access
between community points of interest like
schools, shops, services, parks, transit, and
other important destinations.

Subtask 3.7: Street and Pedestrian
Lighting Analysis
MNS will complete the Street and
Pedestrian lighting analysis which will
focus on approximately four blocks along
6th Street, between California and Palm

Page 1322 of 189 ends

Avenue. It will also cover approximately
six (6) blocks along Beaumont Avenue,
between 5th and 11th Streets. This area
will include pedestrian -scale lighting, such
as bollards and decorative lighting fixtures,
designed to enhance safety, aesthetics
and create an inviting atmosphere. Specific
emphasis will be placed on ensuring that
lighting solutions meet the aesthetic and
functional needs of the downtown area.

A photometric analysis of the existing
condition and proposed conditions will be
developed to highlight deficiencies and
improvements.

Lighting Standards: The lighting design
will be based on the RP -8-22 standard,
which provides guidelines for roadway
and walkway lighting. This will ensure that
the proposed lighting meets the required
levels of illumination, uniformity, and energy
efficiency appropriate for pedestrian
pathways, public spaces, and downtown
corridors. The study will evaluate fixture
types, placement, and spacing in line with
this standard to achieve optimal safety and
visual appeal.

Subtask 3.8: Tree Impact Analysis
GHD's certified arborist will perform a
tree impact analysis for the projects and
streetscape corridors identified in The
DBRP and as listed below. Where proposed
improvements overlap existing trees or
where new trees are proposed, resulting
impacts and potential associated costs
will be analyzed. Cost impacts of new
shade trees will also include a summary
table of urban tree planting strategies to
mitigate tree root and hardscape conflicts
and maximize health of the future urban
canopy.

City of Beaumont
24 GHD will define and determine the impacts
of adding and removing trees in the
following proposed improvement areas:
- Proposal revitalization hubs
- Proposed private developments
• 6th Street and California Avenue
• 6th Street and Magnolia Avenue
• 6th Street and Maple Avenue
- Walkable Housing Projects
- Downtown Mobility Projects
• 6th Street reconfigurations
Gateway roundabouts
Beaumont Avenue reconfigurations
downtown alleys
- Proposed parking reconfigurations
(general impacts and recommendations
for new tree planting)
- Stewart Park
The Tree Impact Analysis will include up
to two (2) site visits by an ISA Certified
Arborist who will perform a walk -by limited
visual assessment of accessible existing
trees in the proposed improvement areas.

The visual assessment will focus on the
following attributes:
- Overall tree health
- Tree structure
- Obvious defects or impacts to existing
hardscape.

Task 4: Design Options
Subtask 4.1: Design Options
for Roadway Improvements
(Conceptual Design)
With the information and results from
the Data Gathering and Analysis (Task 2)
and the Investigations (Task 3) GHD to
review and evaluate three alternatives. The
approximate length of new roadway along
6th street is 6,000 If from Veile Avenue to
Pennsylvania Avenue and 3,300 linear feet
along Beaumont Avenue from E. 5th Street
to 11th Street. GHD will prepare three
(3) memorandums to share with project
stakeholders. The evaluation may consider
important design features including
adjacent R/W, sensitive environmental
resources, planned and proposed purpose,
need, synergies and overlap, connections
to key locations, access, and other
considerations in coordination with the
City.

GHD will prepare concept level plans
(equivalent to 10 percent) using Autodesk
Civil 3D 2025 and utilizing GHD CAD
standards. This will be achieved by
development of two (2) strip maps per
alternative to showcase planned corridor
improvements, one (1) along 6th Street
and one (1) along Beaumont Avenue for
each alternative. These strip maps will show
hardscape improvements, one to two (1-2)
typical roadway sections, striping, parking,
and GIS level utilities. These documents
will be used as attachments in the PDR
to highlight reasoning for the preferred
alternative.

4.1.1: Preliminary Sketch Mark Ups
(Optional)
GHD to provide preliminary design sketch
mark ups of revitalization hubs included in
the DBRP, September 2024.
- 6th Street and N. California Avenue
- 6th Street and Magnolia Avenue
- Beaumont Avenue and 8th Street
Subtask 4.2: Lighting Design
Options
Using the information compiled in Task

3.7, MNS will develop a minimum of three
(3) distinct lighting design options for the
downtown area that align with the goals
outlined in the DBRP. Each option will
be fully informed by the lighting analysis
and will include both engineering and
aesthetic considerations, such as fixture

Page 1323 of 18 ends

type, placement, intensity, and visual
character. To support the City's review and
decision -making process, each option will
be presented using large-scale, full -color
renderings that depict lighting impacts
and design intent within key areas of
downtown. In addition, we will provide up
to five physical architectural color boards
per option to showcase material finishes,
fixture types, and thematic concepts.

A preliminary cost estimate will also be
included for each alternative to help
evaluate feasibility within future budget
planning. Final design concepts will be
submitted to the City for feedback prior to
down -selection.

Subtask 4.3: Design Options
for Streetscape Amenities and
Enhancements (Conceptual
Design)
Following the same design parameters
and extents/limitations as identified
under Task 4.1, GHD's landscape
architecture and streetscape design team
will develop concept level (10% design)
rendered streetscape improvement plans,
cross -sections, schedules, and design
descriptions to illustrate sidewalks (colors
and materials); landscaping themes and
plant types; lighting themes, materials,
and types; options for striping, crosswalks,
pedestrian paths, bike lanes, and parking
options (as developed by civil team under
task 4.1); and other site furnishings and
streetscape amenities that will help create
the full picture for each design option.

GHD will develop three (3) design
alternative options that will be applied to
the 6th Street corridor and the Beaumont
Avenue corridor (as defined in task 4.1). The
three (3) design alternative options will be
used to create a complete rendered plan
25 PDR for Downtown Beaumont Revitalization Plan
City of Beaumont

set package. The rendered plan package
will consist of the following sheets:
- Rendered plan -view drawings, covering
both Beaumont Avenue and 6th Street
• A set of three (3) rendered plan
view sheets for each of the three (3)
alternatives, nine (9) sheets in total
- Render typical cross sections (one for
Beaumont Avenue and one for 6th Street)
• Sections will be developed for each
of the three (3) alternatives
• Three (3) sheets with two (2) typical
illustrative sections per sheet
- Schedule notes sheet(s) for each
alternative design concept that will:
• Describe the design intent of the
alternatives
Summarizing potential planting
and irrigation strategies for each
alternative
Preliminary plant and furnishing
material palettes for each alternative
to identify the different styles and
themes.

GHD will provide the City with a draft
version of the rendered plan package for
review and comment. After receiving all
comments from the City, GHD will update
the submittal to reflect the comments
and submit as the final design packages.

These rendered packages will be used
as attachments in the PDR to highlight
reasoning for the preferred alternative.

Task 5: PDR
Subtask 5.1: PDR
GHD will prepare a PDR for the DBRP, that
is a comprehensive document that outlines
the Project's background, design features,
limitations, and key deliverables. The
Report serves as an executive summary,
providing a detailed overview of the
project's objectives, scope, and anticipated
benefits. It includes several critical
sections such as the Introduction, Project
Features and Design Criteria, Statement of
Limitations, and Reports and Studies.

The Introduction section summarizes
the project background, description,
and benefits, highlighting the plan's aim
to enhance Beaumont's digital presence
and improve customer engagement. The
Project Features and Design Criteria section
details the design elements described in
the DBRP, including gateway roundabouts,
intersection signalization, raised medians,
landscaping, monument signs, parallel
median parking, bike lanes, and artistic
crosswalks. Additionally, the design criteria
and guidelines from the City's General
Plan and Downtown Zoning Ordinance are
referenced to ensure alignment with the
city's long-term vision.

The Statement of Limitations section
discusses the Project's limitations and
challenges, providing a concise yet detailed
description of each limitation, its origins,
and its impact on the study's findings.

This section also considers whether these
limitations could lead to further research.

The Report appendices will house the
reports and studies and encompasses
the primary deliverables of the Scope
of Work, such as the Preliminary Design
(30%), Preliminary Design Specifications
(PDS), and Preliminary Construction
Schedule. Reference materials and exhibits
are incorporated into the PDR after final
City review and approval. This structured
approach ensures that the PDR provides
a thorough and cohesive overview of the
DBRP, facilitating informed decision -making
and successful project execution.

Page 1324 of 18 ends

PDR for Down
Subtask 5.2: Preliminary Design
(30% Plans)
GHD will prepare Preliminary Design
Plans based on the PDR and the DBRP.

These plans will encompass various
elements, including Preliminary Street
Improvement Plans, Sidewalk, Pedestrian
and ADA Improvement Plans, Intersection
Signalization Plans, Street and Pedestrian
Lighting Plans, Signing and Striping Plans
with adequate bicycle lanes, Landscaping
and Irrigation Plans, existing Utility Plans
with noted conflicts, Street Furniture Plans,
Monument and Overhead Sign Plans, and
Wayfinding Signage Plans.

Drawings will be prepared using GHD CAD
standards and City title block in AutoCAD
C3D Version 2025 software at 1"=40' scale.

Please see the items described below for
additional details.

A preliminary sheet list is as follows:

TITLE
Estimated #
of Sheets
Title 1
1 Key Map
1 Project Notes
1 Legend and Abbreviations
1 Survey Control
1 Typical Sections
5 Layout & Striping Plans
18 Utility & Drainage Plans
18 Construction Details
20 Street & Pedestrian Lighting
Plans
10 Traffic Signal Modifications/
Removals
6 Landscaping & Irrigation Plans
18 Ta Al-
:11.00
own Beaumont Revitalization Plan
City of Beaumont
26 The traffic signal preliminary plans will
include:
- 6th Street & California Avenue:

Roundabout conversion (one signal
removal sheet)
- 6th Street & Palm Avenue: Roundabout
conversion (one signal removal sheet)
- 6th Street & Edgar Avenue: Signal
modification (one sheet)
- 6th Street & Magnolia Avenue: Signal
modification (one sheet)
- Beaumont Avenue & 6th Street: Signal
removal (one sheet)
- Beaumont Avenue & 7th Street: Signal
removal (one sheet)
Subtask 5.2.1: Signal Modifications
and Removals
This component will focus on the removal
of existing traffic signals at specific
intersections and the evaluation of
appropriate modifications for safer, more
pedestrian -friendly crossings at others.

For pedestrian safety, we will also consider
the implementation of H.A.W.K. signals
and Rectangular Rapid Flashing Beacons
(RRFBs) at strategic crossings.

The lighting plans will cover approximately
four blocks along 6th Street, between
California and Palm Avenues. It will also
cover approximately six (6) blocks along
Beaumont Avenue, between 5th and llth
Streets.
- Six (6) Street and Pedestrian Lighting
Preliminary Plans along 6th Street
- Four (4) Street and Pedestrian Lighting
Preliminary Plans along Beaumont Avenue
The preliminary design plans for the
DBRP should include key features such
as gateway roundabouts, intersection
signalization, raised medians, landscaping,
monument signs, parallel median parking,
bike lanes, artistic crosswalks and striping,
and wayfinding signage. Additionally, the
plans must show a preliminary assessment
of construction easements needed from
adjacent properties to ensure minimal
disruption to the community and secure
necessary permissions.

5.2.2 Additional Plans (Optional)
Additional plans showing the extent of
areas impacted outside of preliminary
conflict analysis within the adjacent
impacted properties, such as grading to
properly transition new street/sidewalk
grades to existing adjacent property grades
and any improvements that need to be
reconstructed within adjacent properties.

This includes any relocation/reconstruction
of utility service connections, utility
boxes, pull boxes, backflow devices, fire
service connections, mailboxes, and any
other improvements as necessary can be
negotiated under a contract amendment, if
requested by the City. 30% design would
be required for approval prior to start of
work as well as detail of the ground survey
prior to commencement of work.

Subtask 5.3: Preliminary Design
Specifications (PDS)
GHD will prepare PDS as part of the project
requirements. This includes incorporating
the general provisions provided by the City,
outlining any specific conditions that apply
to the project, and including additional
conditions that supplement the special
conditions. Additionally, the task requires
detailing the technical requirements for
the project and creating detailed bidding
tables that show bid items, quantities,
estimated unit prices, and total prices. The
specifications must comply with the City's
Standards, Riverside County Transportation
Department Road Improvement Standards
and Specifications, Riverside County Flood
Control and Water Conservation District

Page 1325 of 18 ends

Standards, and the Standard Specifications
for Public Works Construction, current
edition. Furthermore, the PDS should
be included in the PDR in the Reference
section.

Subtask 5.4: Preliminary
Construction Cost Estimates
GHD will prepare a comprehensive
Construction Cost Estimates in the form of
Bidding Tables, which will include detailed
Bid Items, Quantities, Estimated Unit Prices,
and Total Prices. These tables should
also reflect the Total Construction Cost,
incorporating estimated cost escalation
and contingency factors. Additionally,
our team will attempt to obtain and
include estimated costs, charges, and
fees from utility companies for the work
they will perform. Charges and fees
from regulatory and permitting agencies
should also be shown; if these costs
cannot be obtained, the assumed costs
must be indicated. Estimated costs for
any R/W takes, construction easements,
and work on adjacent private properties
will be incorporated into the estimates.

Furthermore, our team will estimate
soft costs, such as final engineering,
construction management, inspection,
and materials testing/inspection. GHD will
deliver an estimated project budget that
is inclusive of all potential costs, including
any associated costs such as materials
testing and inspection. These Preliminary
Construction Cost Estimates must be
incorporated into the PDR in the Exhibits
section.

Task 6: Environmental Services
(Optional)
GHD will work with the City to complete
an Addendum to the 2040 General Plan
PEIR previously certified for the General
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
27 Plan Update. The Addendum to the 2040
General Plan PEIR will be completed
in accordance with CEQA Guidelines
(Section 15164 of CEQA guidelines, as
recommended in the DBRP.

Subtask 6.1: Prepare Background
and Project Description
In coordination with the City, GHD will first
prepare a draft Background and Project
Description section of the Addendum,
prior to proceeding with the Addendum
analysis. This iterative process is proposed
to ensure that the Project described in
the Addendum is clear and accurate. The
Background will include a discussion of the
relationship of the 2040 General Plan PEIR
to the DBRP. GHD will submit the Draft to
the City for review.

Subtask 6.2: Prepare PEIR
Addendum
GHD will prepare an Addendum to
the certified 2040 General Plan PEIR
to document an analysis of impacts
associated with implementation of the
DBRP. The PEIR Addendum will be
completed in accordance with the CEQA
Guidelines. This will include: 1) Brief
explanation of the decision not to prepare
a subsequent EIR pursuant to Section
15162; 2) Revised Background and Project
Description prepared under Task No. 6.1; 3)
Completion of an environmental checklist
evaluating the DBRP relative to the
environmental topics in the 2040 General
Plan PEIR and subsequent Addenda; and 4)
Inclusion of applicable mitigation measures.

An Administrative Draft document will
be prepared and submitted to the City
for review. After the review, GHD will
update the Addendum, incorporating City
comments, and will provide a Screencheck
Draft to the City for review.

Subtask 6.3: CEQA Coordination
and Public Hearing
GHD will assist the City with the CEQA
aspects of the City's resolution and staff
report, attendance at public hearing where
the PEIR Addendum is approved, filing of
final CEQA documentation with the State
Clearinghouse if the City desires.

Page 1326 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
28 I...I
O
Approach
5 The Power of Commitment

Approach
-* Project Understanding
The Downtown Area of Beaumont has always been the heart of the community. While outlying suburban residential tracts, nearby retail centers, and expansive logistics districts grab attention and enhance the regional profile of the City, the soul and history of Beaumont remains wedded to Downtown at 6th Street and Beaumont Avenue. There, seasonal events such as the Cherry Valley Festival, 4th of July and Holiday Parades, and weekly Nights at Towncenter are social highlights in the community. Downtown's corridors are also home to the City's many independent, unique, locally -owned small businesses.

Here, the DBRP defines distinct and actionable physical projects to secure and grow this success story by "tailoring the suit to fit the role," through safer complete streets, welcoming gateways and a public realm that orients and protects visiting pedestrians, accommodates ever larger events, and catalyzes the next wave of small business that expand within or arrive as newcomers to the City's "Town Center."
The revitalization roadway proposals are as much about
reclaiming Downtown streets as places for people, rather than as the regional conduits they are today. It is a bold investment in safety, community wellbeing, attracting visitors, and securing investor interest. Today, 6th Street frequently serves as a bypass for Interstate 10 (I 10), with vehicles stacking in from neighboring cities. Narrowing and reconfiguring this "main street" corridor will require careful consideration of use flexibility, regional traffic impact, emergency service access, and balance those factors with crucial pedestrian safety and small business needs.

Likewise, Beaumont Avenue's role is already evolving. Where it provides crucial linkage to neighborhoods north and south, a new section design will balance its role as event space, - Restoration and Regeneration of Our
Local Communities is Not a Foreign
Concept to GHD's Team!
We hope you take a few minutes to watch the video linked below (or by scanning the QR Code) to see how we transformed the vehicle -centric La Quinta Village/Old Town from a road into a destination where people can walk, bike, and enjoy all the Village has to offer. Much like the City's project will be once completed, the American Public Works
Association (APWA) National
Project of the Year award
winning La Quinta Village
Complete Streets - A Road Diet
project was more than a roadway,
it was a way of life.
https://vime_ .
com/790182298
La Quinta Village Complete Streets, Road
Diet, ATP

Page 132 ends

F. Approach 130

frontage for new commercial at 8th, and
for frontage improvements between
8th and 6th. Grace Avenue, in particular
is a special opportunity for a bespoke
pedestrian space that can be a regional
draw, laden with historic narrative, paving
features, pedestrian lighting, and outdoor
dining. The Civic Center and adjacent city -
owned lands are under consideration for
future capital improvements that reshape
their role as a community center flanked
by supportive retail and district -wide
parking. These key projects need to be
framed by consistent, Downtown or Town
Center brand -specific gateway landscapes,
archways, and identifying signage. The
outlay of these wayfinding "bread -crumbs"
amid a consistent street tree canopy,
and in conjunction with the Stewart Park
renovation, are part of an image overhaul
that will elevate Downtown Beaumont to
match the vision of its business owners and
economic development team.

Our team frequently prepares these
projects for small communities across
California and is ready to deliver bid -ready
designs for Beaumont. We also understand
this PDR effort entails a degree of strategic
decision -making and design finalization, to
ensure the final roadway configuration and
use cases comport with long-term growth
factors and local stakeholders needs. Our
team will continue it's intensive community
outreach support through ongoing City -
led downtown business engagement and
our highly illustrative outreach workshops
that explain and confirm the direction
we're taking. GHD recognizes that the
collaborative relationship between
Beaumont's Economic Development team,
the Downtown business stakeholders, and
locals who lean -in brings intrinsic value
to the workshops we held in creating the
Revitalization Plan. Our goal is to ensure
this engineering design phase is no less co -
creative with regional interagency buy -in
and a sense of local decision ownership.
1 REVITALIZATION PLAN
The City stands on the cusp of a thrilling
reformation embarking on the next
transformative phase of its DBRP—turning
vision into reality. We understand that this
PDR effort will provide the bridge between
the bold planning concepts developed in
the Downtown Beaumont Revitalization
Plan (DBRP, 2024) and the technical
precision required for the next phase of
work, the successful design, permitting,
and construction. The intent is to advance
a set of catalytic projects that will restore
downtown as the heart of Beaumont's
community and economic life.

Nestled within the historic core of the
City, the revitalization effort is centered
on the vibrant corridors of 6th Street and
Beaumont Avenue and aims to improve
mobility, enhance public space, and enable
new development through targeted capital
improvements. The DBRP identifies a
series of "Revitalization Hubs" and mobility
enhancements, including reconfigured
intersections, new roundabouts, improved
pedestrian infrastructure, and reimagined

Page 1329 of 18 ends

public realms that will nurture small
businesses and walkable housing, crafting
an environment where community spirit
flourishes.

Our team understands that the PDR
is not merely a collection of concepts
but a technical blueprint that embraces
environmental, geotechnical, utility,
drainage, right-of-way (R/W), and traffic
studies necessary to advance priority
improvements into final design. We will
navigate feasibility constraints (like R/W
availability and utility conflicts), prepare
preliminary civil plans (30%), identify
permitting pathways, estimate costs, and
evaluate design alternatives that support
decision -making and funding applications.

Coordination with ongoing initiatives,
such as updates to the Downtown Code,
ensuring CEQA consistency with the 2040
General Plan PEIR, and meeting community
engagement expectations, is paramount.

We will craft the PDR to document and
resonate with the community's aspirations
while aligning with City standards, financial
realities, and operational needs.

Ultimately, this PDR effort is more than
technical documentation. It is a dynamic
milestone on the path to realizing
Downtown Beaumont's long-range vision.

Our commitment is to deliver a Report
and concepts that is not only actionable
and visionary, but is also rooted in solid
engineering and planning principles.
-Approach
Our approach to delivering the PDR for
Downtown Beaumont is grounded in
experience, collaboration, and a proven
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
31 ability to translate visionary plans into final
design -ready designs. As the authors of the
Downtown Beaumont Revitalization Plan,
our team begins this project with a head
start —we know the vision, the context,
the community voices behind it, and the
physical and regulatory realities that must
be addressed to bring it to life.

We also bring lessons learned and
best practices from similar corridor
transformations such as the La Quinta
project mentioned above, West Texas
Complete Streets "The Heart of Fairfield",
and the East Broadway Complete Streets
Project in Long Beach to name just a few.

These efforts involved phasing strategies,
complete streets retrofits, traffic modeling,
roundabout design, transit coordination,
ADA compliance, and creative yet
pragmatic design to overcome significant
physical and funding constraints.

Our local and seasoned Project Manager
Steven Latino, along -side our Assistant
Project Manager Erin McPherson will work
with and guide the City with a structured,
adaptable approach that anticipates
challenges, fosters alignment across
departments and agencies, and results in
an actionable, fundable, and community -
supported 30% design package, as well as
a roadmap to construction.

Together, we will build on what we
helped create
Leveraging our planning and traffic teams,
we come equipped with intimate knowledge
of the project area, technical content, and
stakeholder priorities. We'II refine the City's
priority improvements —such as those on
6th Street, Beaumont Avenue, and near
key Revitalization Hubs —into preliminary
designs based on updated conditions and
engineering analyses. This continuity saves
time, reduces startup costs, and ensures
that technical development reflects the
intent and outcomes of the original Plan.

Technical grounding for an informed
design
We will lead with robust data collection:
topographic and utility surveys, traffic
operations assessments, geotechnical
borings, drainage and lighting evaluations,
and R/W research. In the "Heart of
Fairfield" project, these steps were critical
to overcoming physical constraints like
constrained cross slopes and aging
infrastructure —similar challenges we
anticipate in the City's historic downtown.

This early technical grounding allows us to
produce design concepts that are not just
visionary, but feasible, scalable, and cost -
aligned.
"Heart of Fairfield" Early Alternative Option.

Design alternatives and visualizations
that empower decisions
We will develop and refine concept
alternatives for key streets and
intersections including roundabouts, road
diets, widened sidewalks, bike facilities, and
placemaking features with clear decision
matrices that highlight the benefits and the
impacts that each alternative may have, not
only on the built environment, but also on
the benefits and impacts to the roadway
users (pedestrians and bicyclists) users,
adjacent land owners/operators and the
motoring public.

Sample visualizations.

As the saying goes, "a picture is worth
1000 words", we embrace that on many
of our projects, but especially of projects
that will change the way the roadway will
look and feel for the community. Our
3D visualizations have helped decision -
makers and the public visualize dramatic
corridor changes. It can also help the
City to balance stakeholder priorities with
environmental, engineering, and funding
constraints.

To this end, our landscape architectural
team will lead a streetscape and landscape
design approach that helps the community

Page 1330 of 189 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
32 visualize the potential appearance and
continuity of each selected corridor - each
expressing the context -sensitive character.

The visualizations will help enable citizens
and stakeholders to determine the change
in conditions, character, streetscape
elements, and circulation enhancements
for each roadway while enhancing existing
connections, circulation/user needs,
and design for continuity of a unified
corridor. For the City, we will prepare
plan -view exhibits, renderings , and typical
sections for staff and stakeholder review,
highlighting trade-offs and providing clarity.

Guiding the CEQA strategy and
regulatory navigation
We will coordinate closely with City staff
and the 2040 General Plan PEIR to confirm
CEQA consistency and determine whether
a CEQA Addendum, Negative Declaration
(ND), or Mitigated Negative Declaration
(MND) is required. Our environmental
team will also help scope identify federal,
state and local permitting needs early
including environmental constraints,
Caltrans coordination, utility relocations/
considerations, stormwater compliance,
and potential Section 106 or resource
agency consultation cultural and historic
resources to streamline future phases.

Understanding the environmental
requirements and potential mitigation
needs is key to developing a concept that
can be permitted by the various agencies.

Identifying what technical studies are
required (e.g., biological, cultural, noise,
traffic, air quality) and determining the
appropriate level of CEQA documentation
will be critical in shaping the scope,
budget, and schedule of final design and
construction. Our team will evaluate these
factors early in the process to ensure that
the PDR reflects realistic assumptions
and prepares the City for successful
environmental clearance and permitting.

Providing clear and consistent
communication with the City
We know that great projects require
collaboration. As a fully integrated in-house
team, we are nimble and responsive with
planners, engineers, and environmental
professionals working side by side. Our
approach includes: monthly project
meetings and milestone workshops; real-
time coordination using collaborative
platforms like the AutoCAD Cloud,
Bluebeam, and teams; and early and clear
coordination with other agencies such as
Caltrans, Western Riverside Council of
Governments (WRCOG), utility agencies,
and others.

Project Manager Steven Latino will be
the City's main point of contact and Erin
McPherson will serve as a secondary
point of contact, when needed. We have
found - and proven on other projects - that
having a management team provides a very
effective way to balance the needs of the
internal and external project team allowing
us to be responsive in a timely manner.

Having Steven and Erin will result in
ensuring that even if the one of them is on
a short vacation, traveling for business, or
out sick, you will have a contact here at
GHD who knows the ins and outs of the
project and can respond to your requests
and needs in a timely manner.

We will provide regular updates and remain
responsive to the City's evolving needs
throughout the project duration.

Meaningful engagement with the
community, stakeholders and business
owners
Downtown revitalization is most successful
when shaped by those who live, work,
and invest there. Our approach centers
community voices especially those of
business owners, property owners, and
residents who will be directly impacted
by construction and long-term changes.

Having already led extensive outreach for
the Downtown Beaumont Revitalization
Plan, we will build on those relationships
and the feedback previously gathered to
maintain momentum and ensure continued
alignment with community priorities. Some
of the recommendations that came out
of the last round of engagement were to
conduct a community survey, prepare an
economic development brochure, and
continue promoting the Revitalization Plan
through business leadership events.

We will use a targeted, scalable engagement
approach focused on accessibility,
transparency, and impact. Our strategy is
detailed further below.

In the Fort Ord Regional Trail and Greenway
(FORTAG) project, similar outreach led
to tangible design improvements such as
safer crossings and beautification, a seating
node at the Butterfly Garden, hardscape
and amenity theme selection and more. In
Downtown Beaumont, we will ensure that
business continuity, safety, and access are
central considerations during the concept
design phase.

Page 1331 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
33 GET THE FACTS ON FORTAG
A mailer from one of the hundreds of outreach meetings
conducted on the FORTAG project.

Our in-house outreach engagement
specialists will coordinate closely with City
staff to align messages, avoid outreach
fatigue, and ensure that all voices —
especially increase project accessibility to
those historically underrepresented —have
an opportunity to influence the future of
their downtown.

If you would like to read more about the
outreach efforts completed on FORTAG,
you can view more
information here:

A trailblazing journey:

Navigating community
engagement for the
FORTAG: Canyon Del Rey
project.

Our plan is to deliver a roadmap, not
just a report
The final PDR will include 30% design plans,
cost estimates, a phasing and funding
strategy, CEQA documentation guidance,
and construction staging concepts. We
will make the document implementation -
ready —enabling the City to pursue grants,
initiate final design, and confidently plan
capital improvements.

West Texas Gateway Improvements
®V RFIELD
C�)
West Texas Gateway Improvements outreach handout.

In the "Heart of Fairfield", this approach
directly led to a $10.7M ATP award and a
successful bid -ready PS&E package, which
is scheduled for construction this season.

We aim to deliver the same momentum for
the City.

Our approach to delivering the work plan.

The following is a high-level look at our
approach to each of the main tasks
identified in the request for proposals.

Task 1: Project Management
We will begin with a detailed project
kick-off meeting with City staff to
confirm project goals, priority projects
from the Revitalization Plan, and a list of
stakeholders and coordination needs.

During this task, we will review and
validate the list of priorities, define a
communications protocol and confirm
key contacts, host project team meetings
and more. Our team's familiarity with the
Downtown Plan ensures we can move
quickly and collaboratively from day one.

This task will also include our QA/QC
process, which includes discipline leads

Page 1332 of 18 ends

reviewing each deliverable against scope
and City standards, with checklists and
redline tracking. We will maintain a live
project schedule, updated bi-weekly, with
critical path tracking.

Task 2: Data Gathering and
Analysis
We will mobilize immediately to gather
the critical base information needed to
inform design alternatives. Our in-house
knowledge of the work done to date will
help us streamline this process and start off
quickly.

In both Fairfield and Long Beach, early data
gathering uncovered R/W limitations, poor
drainage conditions, and outdated utilities
that directly shaped our design solutions.

We will bring the same proactive lens to
Downtown Beaumont.

Task 3: Investigations
We will work with the City to obtain all
necessary encroachment permits from
day one to start investigating the existing
infrastructure and collecting the field data
we need as identified in our scope of work.

In the La Quinta and Heart of Fairfield
projects, early data gathering uncovered
R/W limitations, poor drainage conditions,
outdated utilities, and utilities that could
not be relocated, that directly shaped our
design solutions. We will bring the same
proactive lens to Downtown Beaumont.

Task 4: Design Options
Based on field data, public input, and
agency feedback, we will develop
conceptual alternatives for each major
improvement. Our engineers will build
these from the Revitalization Plan
City of Beaumont
34 concepts and evolve them into technically
feasible detailed conceptual drawings.

The concepts will be the basis for the
visualization and rendering work that
will be done in a manner that clearly
shows the City, stakeholders, and the
community what the project alternatives
could look like. All alternatives will include
concept -level drawings, visual renderings,
and a summary of benefits, costs, and
constraints.

Task 5: PDR
Our team will deliver a fully developed PDR
that includes:
- 30% preliminary design drawings (plan,
profile, sections, signing and striping,
lighting, utilities)
Design criteria and Basis of Design
(BoD) memorandum
Detailed cost estimates with
contingencies and unit cost assumptions
Phasing recommendations aligned with
available funding and development
CEQA and permitting and
strategy documentation
Summary of public/stakeholder input
and responses
GIS-compatible base files and CAD
drawing sets
As part of this scope, our environmental
team will review the proposed
improvements for consistency with the
City's 2040 General Plan PEIR. We will
prepare a CEQA Consistency Memo
identifying whether an addendum or
supplemental documentation is needed
and identify regulatory requirements. This
step ensures that design alternatives are
not only feasible, but implementable under
CEQA.

In addition, we will prepare exhibits and
technical narratives suitable for ATP, HSIP,
and other grant applications. In the "Heart of
Fairfield" and the City of Fremont's Dumbarton
to Quarry Lakes Trail project, this enabled
the City of Fairfield to quickly apply for and
secure $10.7M in Active Transportation Program
funding and the City of Fremont to leverage
a grant from the local COG to obtain $2M for
preparation of the environmental document and
final design.

Task 6: Environmental Services
(Optional)
Based on the recommendations in the PDR, our
team will prepare documentation needed to
pursue environmental clearance.

Task 7: Stakeholder Coordination and
Communication (Optional)
Effective communication is central to our
approach. If desired by the City, we will work
hand -in -hand with City staff, external partner
agencies, key stakeholders and the community
to shape designs that reflect shared goals
and can move forward with the project in
confidence. As an extension to the City, we'll
propose an engagement strategy and activities
that align with the project's engagement
objectives, such as understanding operational
needs and concerns. These engagement
activities could include targeted workshops with
key stakeholders meetings, one-on-one and
small group meetings interviews with business
owners, property owners, and community -
based organizations to understand operational
needs and concerns, pop-up engagement
events at high -traffic local events and locations,
digital engagement materials, and public
presentation (i.e. support including City Council,
Planning Commission, or advisory meetings)
as needed. We can also prepare engagement
summaries with key takeaways and , a comment
matrix documenting how community input
shaped project direction —supporting both

Page 1333 of 18 ends

transparency and future grant
applications.
3 Project Schedule
GHD has prepared a preliminary
schedule based on our proposed
scope that outlines the timeframe
necessary to complete the project.

Upon kick-off of the project, the
schedule will be revised with detail to
layout exact submittals and further
break down tasks for better tracking
throughout the life of the project.

GHD anticipates the work to take
approximately 16 months from NTP.
-Conclusion
Our approach is informed by
real -world experience, a deep
understanding of the City's context,
and a commitment to implementation.

Our approach emphasizes feasibility,
phasing, regulatory readiness, and
design excellence across every task.

As demonstrated in our sample
projects, our in-house team can guide
complex downtown revitalization
projects from vision to reality —
responsively, collaboratively, and
efficiently. Should we be selected for
this opportunity, we will join the City as
a partner to delivery.

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
35 City of Beaumont - Preliminary Design Report (PDR) for the Downtown Beaumont Revitalization ID
Task Name
2025
Apr May Jun Jul Aug Sep Oct Nov Dec
Jan
Feb Mar Apr
2026
May Jun Jul Aug
Sep
Oct
Nov
Dec
Jan
Feb Mar
Apr
1 RFP Submitted
5/13
10/15
10/15
10/15
IN=1
2/18
2 City Review
M
6/30
• 7/3
3 Interviews
4 Award
5 Notice to Proceed
6 Task 1 Project Management
r
7/4 7/24
p
7 Quality Management Plan
8 Project Management and Administratioon
7/4
9 Meetings and Coordination
7/4
8/15 —1
7/25 9/4
1/1
10 Community and Stakeholder Engagement
11 Task 2 Data Gathering and Analysis
12 Task 3 Investigations
7/25 9/4
9/5 10/16
13 Survey and Centerline Control
14 Right -of -Way Analysis
10/17 EL 11/27
7/25 10/16
9/5 11/6
9/5 - 11/27
15 Utility Research
16 Geotechnical Investigations
17 Hydrological/Drainage Assessment
18 Traffic Studies and Assessments
9/5 11/27
19 Street and Pedestrian Lighting Analysis
9/5 11/6
20 Tree Impact Analysis
21 Task 4 Design Options
p'
11/28
2/19
4/30
22 Roadway Improvements
1/9
1/30
2/19
3/19
23 Lighting
24 Streetscape Ameneties and Enhancements
3/20
5/1
5/1
25 City Review and Selection of Preferred Alternative
26 Task 5 - Preliminary Design Report (PDR)
9/3
27 PDR
® 7/23
7/23
28 Preliminary Plans
6/12 7/23
29 Preliminary Specs
6/12 7/23
7/24 �
30 Preliminary Cost Estimates
31 City Review of PDR
9/4
10/16
32 Finalize PDR/Preliminary Plans, Specs and Cost Estimates 33 Task 6 - Optional Environmental

Page 1334 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
36 O
Additional Information
5 The Power of Commitment

ao
Additional Information
-Staffing and Managing Tasks Efficiently
GHD realizes that efficiency an staffing will be key in order to guarantee a smooth Project for the City. Our Project Manager Steven Latino will be the representative who spends time at the City. Due to his extensive knowledge of the City, the City's past project, knowledge of City Staff, and location, this will allow for him to develop a process not only that works for all the stakeholders but will set the path going forward for GHD.

It is assumed that GHD, once brought into the Project, will review all items associated with the Project and scope and schedule accordingly for the Project kick-off meeting. Steven will work with the City, GHD staff, and subconsultants to determine the best methodology for communication and Project tracking. Currently, GHD uses several tracking tools, including Microsoft Loop and GHD People Planner. In addition, Steven has previously used the Planner add on within Teams to track Projects.

Once the methods have been determined and everything
is up and running smoothly, Steven will work with the City to develop a PMP documenting the process so that there is an understanding between all parties how the work will be carried out. This will allow for consistency for the City and its stakeholders throughout the life of the contract. Additionally, that PMP and staff will stay with them through the life of the Project.

Initially, GHD has identified numerous internal employees that can assist in carrying out the Project duties. As discussed in other sections, we are very aware of the ebbs and flows as it relates to PDRs. GHD is employs over 12,000 people worldwide and understands that the need to add additional staff may become necessary. Our team has extensive internal resources to match the ebb and flow of the PDR environment. We will make sure that sufficient trained resources are available to support the

Page 133 ends

Differentiators
Extensive Experience: With over 95 years in operation, GHD has a long history of successfully delivering engineering services across various sectors.

Local Expertise: Our Irvine office, where the majority of the work for this contract will be performed, is home to more than 80 professionals with extensive experience in Southern California. Our local team is supported by over 425 staff members throughout California and 5,000+ staff members
across North America.

Client -Centric Approach: Driven by a client service -led culture, we connect the knowledge, skill, and experience of our people with innovative practices, technical capabilities, and robust systems to create lasting community benefits.

Proven Track Record: GHD has a proven track record of
success in working with numerous municipalities and agencies in Southern California, ensuring timely and effective project and task delivery.

G. Additional Information 138

volume of work required in this contract, if
more are needed.
-Other Value -Added
Services
Digital Engagement Tools: GHD provides a
suite of digital engagement tools to support
project development, planning approval,
and delivery for major infrastructure
projects globally.

Our services are enabled with a digital
toolkit and processes to support projects
and programs of work, including Multi
Criteria Assessments, Web GIS and 3D
Digital Engagement and Visualization
platforms, which incorporate customizable
information to effectively inform, consult
and engage with stakeholders in a more
immersive and accessible way.

Our digital toolkit, leverages design and
planning data developed during the
project lifecycle, to a provide a central
gateway that uses interactive maps, digital
content, dashboards, and visual tools to
allow internal, agency and community
stakeholders to engage on a project from
their computer, tablet, or mobile phone.

Our tools and processes provide an
engaging and accessible executive
summary of complex project information
like reports, plans, environmental impact
statements, maps, design visualizations,
and construction information.

The toolkit also can be used by internal
stakeholders to access a broader suite
of technical delivery content and project
information and brings a customizable
suite of features and options, powered by
a robust content management system,
including:
- Interactive project maps powered by ESRI
- Collateral and visual content library
- Expandable information panels
- An immersive community engagement
tool with clickable hotspots to view
images, videos, FAQs, and documents
- Visualization tools, 3D models and
photorealistic renderings
- Before and after slides
- In addition, GHD Engage can integrate
with several existing public engagement
and storytelling platforms including:
• Social Pinpoint and other third -
party API integration
Built within the GHD Engage
platform, the EIS Portal, was
created using a combination of ESRI
technical maps streamed within
an 'Easy to Use' navigation system
to help stakeholders explore key
information associated with the
EIS technical reports and location -
based imagery and illustrations.

Page 1337 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
39 11
DLO
References
5 The Power of Commitment

r
O
References
References Overview
GHD has actively collaborated with the City and stakeholders on the PDBR, delivering urban planning and intensive community outreach services. Additionally, our proposed team members have been active in the planning, design, development, and construction of numerous roadway, complete streets, roundabout, ATP, and PSR projects in the Inland Empire and throughout California for various clients. Sensitive to community and agency concerns, we offer strong project management to keep projects on schedule and within budget.
-}Relevant Projects/References
The projects highlighted in this section demonstrate our team's technical capabilities and experience, as well as recent experience comparable to the City's Project. Furthermore, they illustrate our ability to address complex issues and demonstrate our history of working as a collaborative team.

Downtown Beaumont Revitalization Plan (DBRP)
Beaumont CA
The City proposed to
develop a DBRP along
the 6th Street corridor,
which would include two
subdistricts called the
Downtown District and
the Extended Sixth Street
District, as well as a north -south corridor called the Beaumont Avenue District. The new DBRP would offer economic diversity and housing/cultural opportunities in a pedestrian -friendly, mixed - use setting. GHD was selected to provide services for the DBRP that included Economic Development, Planning Commission, City Council, and Community Visioning workshops; coordinating and collaborating with key stakeholders for input; analyzing and documenting existing conditions; reviewing current vision concepts and policies and plans; developing market feasibility strategies for the implementation plan development, site recommendations, and strategic market -driven timing goalposts; providing an initial draft and final DBRP and implementation strategy; and developing key visualizations with published documentation findings.

DOWNTOWN BEAUMONT
Client/Contact
City of Riverside I Kyle
Warsinski I Senior Project
Manager (former Economic
Development Manager at City
of Beaumont) 16927 Magnolia
Avenue, Riverside, CA 92506
951.926.5168
[email protected]
Project Dates
2022-2024

Page 1339 ends

H. References 141

La Quinta Village Complete Streets,
Road Diet, ATP I La Quinta, CA
The "La Quinta Village Complete Streets - A Road Diet
Project" aimed to improve safety and accessibility
of roadways for pedestrians, bicyclists, and golf cart
users. The project transforms three, heavily vehicle -
dominated corridors with three parks, an elementary
school, and other destinations into pedestrian,
bicycle, and neighborhood electric vehicle -friendly
complete streets through the implementation
of a road diet, road repurposing, and converting
five signalized or stop controlled intersections
to roundabouts. GHD provided preliminary cost
estimates and benefits analysis, conceptual design,
Cycle 3 ATP grant application narrative responses,
pedestrian/bicycle counts, NEPA, public outreach,
utility coordination, bidding/construction support/
management. Due to firm's expertise in roundabout
and streetscape design, GHD was also awarded the
additional environmental clearance, R/W acquisition,
and design work. The team's complete understanding
of the City's objectives, grant funding requirements,
SMEs, and an exceptional project approach allowed
GHD to accelerate the schedule, resulting in clearing
environmental, finalizing R/W acquisition and
utility coordination, delivering the final plans, and
submitting the request for allocation for construction
funds more than one year in advance of the original
schedule. GHD provided community engagement
through educational videos and public outreach
communicating expectations and proper usage for the
community.

Client/Contact
City of La Quinta
Bryan McKinney I City
Engineer 179-495 Calle
Tampico, La Quinta, CA
92253 1760.777.7045
bmckinnney@
Iaquintaca.gov
Project Dates
22018-2020
West Texas Complete Streets
Fairfield, CA
West Texas Street is a five -lane arterial road that
serves as a crucial connection between I-80 and
significant transportation hubs. With average daily
traffic volumes exceeding 25,000 vehicles per day
at the expense of community connectivity, safety,
and livability. The city embarked on ajourney of
developing the Heart of Fairfield Specific Plan.

GHD was selected to build on the Plan to prepare
initial feasibility for private funding opportunities
with planned redevelopment, including analysis of
Special Finance Districts and preparation of corridor
transportation study and concepts. Concepts
included implementation of a combination of
bicycle facilities, pedestrian and motor vehicle
safety features/enhancements, and comparison
of the opportunities and constraints of each. They
included evaluation of a roadway reconfiguration
of a five -lane street section to either widened
sidewalks, Class IV and Class IV parking protected,
Class II buffered or Class II bike facilities, travel lane, and TWLT or raised meridian in certain portions of
the corridor. Intersection control was evaluated,
including both traffic signal and roundabout upgrades.

GHD produced a variety of financing option study
documents, transportation corridor study technical
memorandum, four plan line concepts and analysis of
construction phasing, and grant funding opportunities
including for ATP, HSIP, and Urban Greening. GHD
developed a Cycle 5 ATP application for this project
which has been recommended for funding.

Client/Contact
City of Fairfield
Ryan Panganiban 1
Assistant Public Works
Director/City Engineer
11000 Webster
Street, Fairfield, CA
945331 707.428.7017 1
rpanganiban@fairfield.
ca.gov
Project Dates
2018 - Present
De Portola/Jedidiah Smith Roads
Roundabout I Temecula, CA
The De Portola/Jedidiah Smith Roads roundabout
aims to address the City's growing traffic congestion
and enhance roadway safety. This project involves
the construction of a modern roundabout designed
to calm traffic, accommodate non -motorized
users, and maintain the rural character of the area.

Key features include expanded splitter islands and
increased roadway deflection to gradually slow
approaching vehicles, as well as an oval -shaped
roundabout for improved vehicle entry angles and a
smaller footprint. Additionally, it incorporates angled crosswalks and bicycle ramps to enhance visibility
and ease of use for pedestrians and cyclists. GHD is
providing preliminary design, public outreach with the
surrounding community, and PS&E for the proposed
intersection improvements. Community engagement
and consensus building are central to the project's
success. GHD engaged the community with outreach
meetings, receiving valuable feedback about concerns
of the proposed improvements and adjacent property
owners. Many of the concerns involved speeding,
safety, and equestrian accessibility. All design aspects accommodated equestrian mobility in and around
the roundabout, but also the increased trailer usage.

GHD was able to accommodate the design of the
roundabout within the existing City R/W requiring
only temporary easements for construction. GHD
has completed the 60% plans and estimates and is
currently progressing the 90% PS&E package.

Client/Contact
City of Temecula
Traffic Engineering
Division 1 Nick Minicilli 1
Senior Traffic Engineer
141000 Main St.,
Temecula, CA 92590
nick.minicilli@
temeculaca.gov 1
951.693.3912
Project Dates
2024 - Present
The project is located at the intersection of Avenue
52 and Jefferson Street, where an existing roundabout
serves as a critical hub for traffic movement in the
area. While functional, the current configuration has
identified opportunities for safety and accessibility
enhancements. GHD is providing evaluation of the
existing roundabout at the intersection of Ave. 52/
Jefferson Ave. to identify improvements to enhance
safety and functionality. The existing intersection is a single lane roundabout with right -turn by pass lanes
in all directions. Jefferson Ave. is striped as two lanes with trap right turn lanes and Ave. 52 is striped as a
single lane. Approach speeds on the roundabout are
relatively high, and the City's general plan identifies that future expansion of both roads is necessary.

GHD is focusing improvements on functionality
for future expansion of the roundabout including
a two-lane roundabout to accommodate needed
additional lanes. GHD will establish the ideal lane
configuration and provide intersection geometrics
and three concepts to modify the existing roundabout
for compliance with the 2024 NCHRP Report 1043.

GHD is in the preliminary stages and will begin the
evaluation of the roundabout. GHD will present the
alterations to the roundabout to the City Council to
determine the next steps. Once the City Council and
public outreach is complete, GHD will develop bid
ready documents to facilitate the changes.

Client/Contact
City of La Quinta
Engineering Services
Bryan McKinney I City
Engineer 179-495 Calle
Tampico, La Quinta, CA
92253 1760.777.7045
I bmckinnney@
laquintaca.gov
Project Dates
2024 - Present

Page 1340 of 1893 ends

GHD
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
42 SR 29/SR 221 Interchange, Soscal
Junction I Napa County, CA
The Soscal Junction project improves safety, relieves
congestion, and improves multimodal transportation
at the Gateway of Napa Valley. As part of the project,
the construction of two, new roundabouts within the
SR 29/SR 221 interchange keeps the traffic flowing at
one of the busiest highway interchanges. This reduces
the risk of rear -end accidents and traffic delays by
converting the existing signal -lights approaching the
interchange into a series of roundabouts The project
consisted of design of a tight diamond interchange
with two, multi -lane roundabouts on either side
of SR 29. SR 29 was rebuilt as an overcrossing
north of the intersection with SR -221, providing
separation between SR -29 and Soscol Ferry Road
and the adjacent roundabout entry. The project
also constructed Class 1 facility to accommodate
bicycles and pedestrians through the intersection.

GHD assisted with the preparation of the PA/ED with
Caltrans District 4 for a revision to the original Caltrans flyover concept to a diamond interchange at the SR 29
and 221 interchanges, proposing roundabouts for both
ramp intersections. GHD also led portions of design
and finalization of the project during Caltrans' review and approval process and led preparation of select
plan sheets including layout, construction details, and grading plans. This is a high -profile project for Napa Valley Transportation Authority (NVTA), as the agency
has been trying to update this integral intersection for the last decade.

Client/Contact
City of Napa
Engineering Division
Julie Lucido I Deputy
Director of Engineering
955 School Street,
Napa, CA 94559
707.257.9520
[email protected]
Project Dates
2014-2015
Downtown Specific Plan
Twentynine Palms, CA
The City is creating a new Downtown Specific Plan to
guide development for over a 20 -to -25 -year horizon.

The Plan defines goals, policies, and implementation
actions for economic development and employment,
land use/zoning, housing, landscaping, open space,
transportation/connectivity/mobility, and parking.

Downtown should serve as the economic and social
hub, but major retail businesses vacated downtown
properties while developers favor larger lot sizes and
car -oriented formats not suitable to a walkable and
vibrant downtown. The new Plan fosters economic
revitalization and reduces barriers to housing
affordability with a land use strategy that invited
sustainable growth, investments in safer multimodal
roadways and green spaces, and forward -thinking
catalytic projects for new business. GHD was
challenged to reshape the regulatory and capital
investment landscape to entice entrepreneurs, jobs,
residents, and tourists. Key challenges included a
lack of municipal sewer, adequate tourist -oriented
public realm for events, and interest from retail
developers. GHD led a multidisciplinary team including
subconsultants in real estate strategy, VMT analysis,
and archaeology. GHD's responsibilities included all
land use, development planning, and urban design; an
IS/MND; transportation/roadway concepts including
improvements along the SR 62/Twentyine Palms
Highway Corridor, Adobe Road Corridor, and Freedom
Way Downtown Paseo; sewer funding strategies; public
workshops; and draft/final Specific Plan document.

Client/Contact
City of Twentynine
Palms Department
of Community
Development I Travis
Clark 16136 Adobe
Road, Twentynine
Palms, CA 92277
I 760.367.6799
[email protected]
Project Dates
2021-2022
Milpas Street Crosswalk Safety and
Sidewalk Widening I Santa Barbara, CA
Milpas Street is a busy arterial street in the Eastside neighborhood with five lanes of traffic carrying over
23,000 vehicles per day. Milpas ranks #2 in the
City for the highest number of pedestrian -involved
collisions. As a result, City Council designated Milpas as a Vision Zero Priority Corridor. The community
advocated active transportation solutions including
a bicycle boulevard and walking improvements. The
City applied for an ATP Cycle 6 grant for the Milpas
Street Crosswalk Safety and Sidewalk Widening
Project in 2022 and was successful, with nearly
$8 million awarded to the City for final design and
construction. The improvement project includes
safety enhancements including: new curb extensions,
high -visibility crosswalks, additional lighting,
accessibility improvements, widened sidewalks at
street corners and transit stops, leading pedestrian
intervals at signalized intersections, mast arm mounted rectangular rapid flashing beacons, and a median
refuge island at one non -signalized intersection. Three- foot -wide buffers will be added to the existing bike
lanes between Cota and Canon Perdido Streets to
improve cyclist safety and additional bicycle parking
on Milpas Street will improve cyclist access. GHD is
overseeing the design of nine blocks of intersection
improvements in the main east side arterial street of
Milpas Street. Construction is expected to occur in
2027.

Client/Contact
City of Santa Barbara
Public Works I Alexis
Lopez 1630 Garden
St., Santa Barbara, CA
93103 1805.564.5526
aflores@SantaBarbara.
gov
Project Dates
2021-2022
SR 121/8th Street Intersection
Improvements I Sonoma County, CA
This project incorporates Vision Zero strategies by
reducing the number of conflict points at the integral
intersection forcing vehicles to reduce speeds as
they approach the intersection ]improving safety for
all users. The project also reduces GHG emissions
by minimizing vehicle idle times and encouraging
multimodal users for bicycles/pedestrians to cross
SR 121/SR 12 to connect to the proposed Sonoma
Schellville Trail with the planned San Francisco
Bay Trail. GHD managed the first PID phase as part
of an SCTA on -call task order. GHD developed
and evaluated alternatives to provide a safe and
equitable improvement, which best meet local and
regional goals while minimizing impacts to the natural
environment and protecting historically -significant
structures. GHD oversaw alternative analysis and
development and the PSR-PDS that included traffic
operations analysis, ICEs, VMT assessment, complete
street assessment, estimate, public outreach, and
more. The PSR-PDS explored roundabout and
signalized alternatives. GHD coordinated with many
local stakeholders including SMART, Sonoma County,
and Caltrans. The second phase included a PA/ED
document and an IS/MND for CEQA and a CE under
NEPA. GHD prepared various environmental technical
studies in support of both. GHD prepared the draft
Project Report and supporting studies. The PA/ED
phase is carrying the roundabout and signal alternative forward through the initial analysis. The coordination
with local stakeholders is continuing.

Client/Contact
Sonoma County
Transportation Authority
RCPA I David Ripperda
I Director of Projects &
Programming 1411 King
Street, Santa Rosa, CA
95404 1707.565.2180
I David.Ripperda@scta.
ca.gov
Project Dates
2024 - Present

Page 1341 of 1893 ends

GHD
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
43 O
Resumes
5 The Power of Commitment

O
Resumes
Project Manager
Steven Latino has focused his career on
providing services to local municipalities
throughout Riverside and San Bernardino
Counties. His experience as both a public
and private employee provides a unique
approach to project delivery. During his
career, Steven has taken numerous projects
from concept to completion, which
provides a keen sense of awareness to
agencies' needs. He believes that spending
time in the field and familiarizing his team
with the project before design kicks off
and during the design process eliminates
future challenges. This experience allows
Steven to visualize the construction during
the design phase eliminating constructibility
challenges and alleviating potential for
unnecessary change orders.

Relevant Experience
De Portola/Jedidiah Smith Roads
Roundabouts I Temecula, CA I City of
Temecula I Project Manager: The project
involves the construction of a modern
roundabout designed to calm traffic,
accommodate non -motorized users, and
maintain the rural character of the area.

Key features include expanded splitter
islands and increased roadway deflection
to gradually slow approaching vehicles,
as well as an oval -shaped roundabout
for improved vehicle entry angles and a
smaller footprint. The project incorporates
angled crosswalks and bicycle ramps to
enhance visibility and ease of use for
pedestrians and cyclists. GHD is providing
preliminary design, public outreach with
the surrounding community, and PS&E for
the proposed intersection improvements.

GHD has engaged in community outreach
meetings, receiving valuable feedback
about the concerns of the proposed
improvements, and how to address design
concerns for the adjacent property owners.

GHD was able to accommodate the
roundabout design within the existing City
R/W requiring only temporary easements
for construction. Steven is responsible for
the delivery of a bid ready set of PS&E
documents and coordinating task managers
to deliver the various aspects of this
project. He has provided extensive client
coordination due to the concerns of the
surrounding neighborhood.

Avenue 52 at Jefferson Roundabout
Improvements I La Quinta, CA I City
of La Quinta I Project Manager: G HD
is providing evaluation of the existing
roundabout at the intersection of Ave. 52/
Jefferson Ave. to identify improvements
Why Steven?
O Oversight of multidiscipline teams for
roadway improvement projects
ig Municipal roadway planning and
engineering
• Lives in close proximity to the
community...10 minutes from City Hall
Years of Experience
21 Education/Accreditations
- MBA, Business Administration, University
of Redlands
- BS, Civil Engineering, Purdue University
- PE, CA #73430
- TE, CA #2902
to enhance safety and functionality.

The existing intersection is a single lane
roundabout with right -turn by pass lanes
in all directions. Jefferson Ave. is striped
as two lanes with trap right turn lanes
and Ave. 52 is striped as a single lane.

Approach speeds on the roundabout
are relatively high, and the City's general
plan identifies that future expansion of
both roads is necessary. GHD is focusing
improvements on functionality for future
expansion of the roundabout including a
two-lane roundabout to accommodate
needed additional lanes. GHD will
establish the ideal lane configuration
and provide intersection geometrics and
three concepts to modify the existing
roundabout for compliance with the
2024 NCHRP Report 1043. GHD is in
the preliminary stages and will begin the
evaluation of the roundabout. GHD will
present the alterations to the roundabout
to the City Council to determine the next
steps. Once the City Council and public

Page 1343 of 18 ends

PDR for Dow
ntown Beaumont Revitalization Plan
City of Beaumont
45 outreach is complete, GHD will develop bid
ready documents to facilitate the changes.

Transportation Project Prioritization
Study (TPPS) Update I Rancho Mirage,
CA I CVAG I Technical Support/Agency
Coordinating Lead: The project updates
the TPPS and companion documents
including the Traffic Census Report, the
Regional Arterial Cost Estimate, ATP,
and TUMF Nexus Study. CVAG also has
received funding to conduct a study of
impacts and resultant mitigation needs
of logistics and trucking development
in the Coachella Valley The goal of the
study is to: 1) identify likely areas for high -
cube warehousing and logistics growth,
with consideration given to compatible
zoning, proximity to sensitive receptors,
and accessible truck routes; 2) assess
impacts resulting from increased truck use
on regional transportation infrastructure,
including such impacts as may be caused
by both regional and long distance goods
movement and delivery; and, 3) provide
a cost estimation for impact mitigation
actions for consideration and potential
inclusion into the TPPS and TUMF
updates, controlling for the proportion
of any project cost already allocated to
non -logistics development. The logistics
study component is anticipated to result
in a stand-alone report that can be
distributed to member agencies to aid in
the implementation of AB 98, and that
further provides supplemental information,
analysis and input to be incorporated
into the update of the TPPS and related
documents. GHD will manage and support
the update of the TPPS for CVAG, including
project management, participation in
advisory group meetings, desktop surveys,
field investigations, and verification of
project data with member agencies.

Jackson Street Complete Streets I Indio,
CA I City of Indio I Project Manager: The
City successfully received roughly $5M
to beautify Jackson Street from Kenner
Avenue to Avenue 45 (approximately .75
miles). The intent was to visually transform
Jackson Street by encouraging pedestrians
and bicyclists to use the corridor. Provided
PS&E for the proposed improvements. The
work includes upgrading sidewalk, ADA
ramps and driveways, installation of an
artistic shade structure, Big Belly trash cans
and upgrading landscaping and irrigation
throughout the project. As part of the
project, the City is installing a decorative
shade structure that was designed by an
artist. Responsible to coordinate the design
of the structure with the artist and worked
with a structural engineering team to assist
the artist with the design of the steel
used for the work, as well as foundation
design for the proposed structures. Led
the team to perform a site visit with the
City and artists to determine the best
locations to install the structure, as well
as identified deficiencies in sidewalk and
ADA improvements along the corridor. As
part of the curb ramp revisions, several
crosswalks and intersections required
upgrading and modifications to bring them
into compliance with ADA. Additionally,
the City worked with the team to perform
the necessary public outreach as required
through the grant funding opportunities.

Club Drive Complete Streets I Indian
Wells, CA I City of Indian Wells I Project
Manager: Led a team to prepare the PS&E
for project. The project consisted of new
sidewalks, ADA-compliant curb ramps,
upgrading the bicycle facilities on Club
Drive to connect pedestrians and bicyclists
to a nearby shopping center, and a new
walkway within the private shopping center.

The team prepared a landscape concept
plan with drought tolerant landscaping
and accent lighting. Led the team to
prepare concept alternatives to present
at a public outreach meeting. Assisted in
selecting a preferred alternative based
on nearby stakeholder and community
feedback. Developed a pavement
rehabilitation strategy due to Club Drive
heavy deterioration and excessive cracking.

Worked with the geotech to undertake
borings and prepare different pavement
rehabilitation strategies ranging from grind
and overlay to full depth replacements and
coordinated changes with the City.

Shoreline Drive Realignment/Complete
Streets I Long Beach, CA I City of Long
Beach I QA/QC/Technical Specification
Writer: Providing services for the
realignment of northbound/southbound
Shoreline Dr. under the existing Ocean
Blvd. overcrossing, allowing streamlined
traffic flow and structural integrity. GHD
is designing the Broadway to Shoreline
extension, forming a new signalized
intersection to improve traffic management.

Led the reconstruction of Broadway from
Shoreline to Maine, including the demolition
of the existing bridge to accommodate the
new infrastructure. Implemented converting
one-way to two-way streets on Broadway,
Third Street, and Seventh. Constructing
Class I bike paths along Golden Shore and
Broadway, providing connectivity to the
LARIO Trail and proposed Drake/Chavez
Soccer Fields, promoting sustainable
transportation solutions. Facilitated the
conveyance systems for stormwater and
reclaimed water, allowing efficient flow
and connection to LBMUST via the future
Shoemaker Bridge project.

Page 1344 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
46 Technical Advisor/QA/QC
Lindsey Van Parys is a GHD Principal
and Technical Advisor who provides
overall support and guidance on project
operations. For the past 17 years, she
has focused her career on helping local
agencies improve safety and equity in
their communities through implementing
a variety of transportation projects
including roundabouts, complete streets/
streetscapes, multi -use trails, roadway and
highway improvements, and many other
types of projects. She has expertise in
delivering projects from the conceptual
stage through to construction. Often, she
steers community education and outreach
for a variety of contentious projects
throughout the region, collaborating with
stakeholders, local businesses, agencies,
and the public to build popular acceptance
and ultimately construct the project
without unnecessary impacts. Lindsey has
been with GHD since 2012 and works on
projects across North America.

Relevant Experience
La Quinta Village Complete Street,
Road Diet, ATP I La Quinta, CA I City
of La Quinta I Project Manager:

Responsible for the overall delivery of
the environmental documentation, PS&E,
R/W, and utility clearance for the three-
mile, three street corridor complete street
project consisting of five roundabouts,
water quality infrastructure, pedestrian
and bicycle facilities, golf cart facilities,
and landscape/beautification elements.

Also coordinated stakeholder outreach,
one-on-one meetings with impacted
property owners and business owners
and performed community outreach.

Coordinated utility relocations with six
different utility purveyors and coordinated
with two adjacent projects constructed
concurrently with the complete street
project. Created a robust outreach effort
which included a child focus education
campaign to teach children how to
navigate roundabouts through the creation
"Rosita" a children's cartoon character who
teaches children how to walk and bike a
roundabout. Oversaw development of a
Rosita comic book. Developed four "How
To" educational videos for adults that focus
on how to navigate the roundabouts on
foot, bike, by car and by golf cart.

West Texas Street Complete Streets I
Fairfield, CA I City of Fairfield I QA/QC:

West Texas Street is a five -lane arterial
road that serves as a crucial connection
between I-80 and significant transportation
hubs. GHD was selected to build on
the Plan to prepare initial feasibility for
private funding opportunities with planned
redevelopment, including analysis of
Special Finance Districts and preparation of
corridor transportation study and concepts.

GHD produced a variety of financing
Why Lindsey?
cs Oversight of complete streets,
roundabouts, streetscapes, roadway
and highway improvements
O Steers community education and
outreach on transportation projects
Years of Experience
17 Education/Accreditations
- BS, Civil Engineering, California State
University, Sacramento; BS, Health
Science/Spanish, California State
University, Sacramento
- PE, CA #79989
- QSD/P, CA #23897
option study documents, transportation
corridor study technical memorandum,
four plan line concepts, and analysis of
construction phasing, and grant funding
opportunities including for ATP, HSIP, and
Urban Greening. GHD developed a Cycle 5
ATP application for this project which has
been recommended for funding.

Milpas Street Crosswalk and Sidewalk
ATP I Santa Barbara, CA I City of
Santa Barbara I Project Director: For
this Cycle 6 ATP grant, overseeing the
design of nine blocks of intersection
improvements in the main east side arterial
street. Improvements include safety
enhancements: new curb extensions, high
visibility crosswalks, additional lighting,
accessibility improvements, widened
sidewalks at street corners and transit
stops, leading pedestrian intervals at
signalized intersections, mast arm mounted
rectangular rapid flashing beacons, and a
median refuge island at one non -signalized

Page 1345 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
47 intersection. Three -foot -wide buffers will
be added to bike lanes to improve cyclist
safety, and additional bicycle parking.

SR 121/8th Street East PSR-PDS and
PA/ED I Sonoma, CA I SCTA I Project
Manager: Managed the first phase of
this multimodal intersection improvement
project. Developed and evaluated
alternatives that provide a safe and
equitable improvement which best meet
the local and regional goals while minimizing
impacts to the natural environment
and protecting historically significant
structures. Oversaw alternative analysis and
development and completing the PID was
determined to be a PSR-PDS that included
traffic operations analysis, ICEs, VMT,
assessment, complete street assessment,
estimate, public outreach and more.

The PSR-PDS explored roundabout and
signalized alternatives. Coordinated with
many local stakeholders including Sonoma
County Regional Parks Department,
SMART, Sonoma County, and Caltrans.

PA/ED Phase: Managing the second phase
of the SR 121/8th Street East, the PA/
ED document is an IS/MND for CEQA
and a CE under NEPA. Preparing various
environmental technical studies in support
of both the IS/MND and CE. Preparing
the Draft PR and supporting studies. The
PA/ED phase is carrying the roundabout
and signal alternative forward through the
initial analysis. The coordination is the local
stakeholders is continuing.

Avenue 64 Complete Streets I Pasadena,
CA I City of Pasadena I Project Manager:

Delivered the design of a roundabout
intersection at Avenue 64 and Burleigh
Drive, as well as an intersection bulb out
with medians at Avenue 64 at Cheviotdale
Drive in addition to other complete street,
traffic calming, bicycle, and pedestrian
enhancements for the entrance into the
City of Pasadena from Los Angeles. Led
the team in designing a custom roundabout
at Burleigh Drive to reduce vehicle speeds
while providing full access to adjacent
driveways completely within the City right
of way while still accommodating property/
driveway access and providing a space for
refuse pickup, parking and more. Included
water quality design, utility relocation,
completed roadway resurfacing, lighting,
outreach with property owners, and
coordination with emergency responders.

Highway iii Corridor Revisioning and
Specific Plan I La Quinta, CA I City
of La Quinta I Engineering Manager:

Overseeing the alternative development
for the corridor to transform this into a
"downtown setting" for new residents in a
more walkable, liveable, and economically
diverse mixed -use district. Assisting in
informing the vision for a full specific
plan that includes infill housing, new
workplace uses, walkable main street
environments, and improved public realm
along regional bikeway and cultural trail
corridors. Coordinating with GHD's urban
planners and transportation planners
to develop four major elements of the
specific plan: a comprehensive land -use
driven district plan, a form -based code
drive by architectural guidelines all -
encompassing development standards, a
CEQA environmental assessment expected
to lead to an IS/MND, as well preliminary
engineering designs for a compete streets
enhancement, pedestrian safety and public
realm improvement
Shoreline Drive Realignment I Long
Beach, CA I City of Long Beach I
Project Manager: Overseeing the
$65M construction project involving
the realignment of northbound and

Page 1346 of 189 ends

southbound Shoreline Drive under the
existing Ocean Boulevard Overcrossing,
ensuring streamlined traffic flow and
structural integrity. Directed the extension
of Broadway to Shoreline, forming a new
signalized intersection to improve traffic
management. Led the reconstruction
of Broadway from Shoreline to Maine,
including the demolition of the existing
bridge to accommodate the new
infrastructure. Implemented Class I
Bike Paths along Golden Shore and
Broadway, providing connectivity to the
LARIO Trail and proposed Drake/Chavez
Soccer Fields, promoting sustainable
transportation solutions. Facilitated the
conveyance systems for stormwater and
reclaimed water, ensuring efficient flow
and connection to LBMUST via the future
Shoemaker Bridge project.

FORTAG (California Avenue Segment) I
Monterey County, CA I TAMC I Project
Director: Responsible for overall PS&E,
environmental addendum, R/W, utility
clearance, local agency and public
stakeholder engagement, for another
segment of the 28 -mile trail. This almost
two-mile trail will connect people to open
spaces and removes barriers to access
for active modes of travel within the
City of Marina and provide connectivity
to a third segment of the trail and to
CSUMB. Responsible for evaluating
concepts to cross the busy Imjin Road
by either a bridge, a protected midblock
crossing, a protected intersection, or at
a "Dutch style" roundabout. The project
also will incorporate a protected bicycle
intersection/signal modification, almost 2.0
miles of Class I pathway, safety through
environmental design, lighting/electrical,
and equestrian accommodation.

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
48 i , V
drib
tLr
Principal in Charge
Todd Tregenza has 17 years of experience
in transportation planning, assisting dozens
of agencies in short- and long-range
programming including the development
of travel demand models, general plan
circulation elements, specific and master
plans, corridor studies, CIP, nexus and
fee studies, transportation operational
analyses, and impact analyses. This
experience spans public and private
sectors, extending into on -call contracts
and arrangements with municipalities,
where Todd prepares transportation studies
and grant applications, performing peer
reviews of impact studies and developing
CEQA impact analyses for development
projects of all sizes.

Relevant Experience
Downtown Revitalization Plan I
Beaumont, CA I City of Beaumont I
Project Director: This 506 -acre overlay
plan and economic strategy project
required coordinating detailed urban
designs with guidelines and economically
catalyzing CIP.

West Texas Street Complete Streets I
Fairfield, CA I City of Fairfield I Senior
Transportation Planner: Assisted in
the analysis of corridor alternatives
guided by the vision and goals of the
Heart of Fairfield Specific Plan along
West Texas Street. Corridor concepts
included roundabouts, mid -block
crossing locations for pedestrians, and
parking -protected Class IV or buffered
Class II bikeways. (Preferred plan calls
for a phased implementation of Class IV
bikeways.) Led and assisted in preparation
of HSIP and ATP grant applications for
plan components, then selected project
components to maximize cost -benefit in a
single HSIP application.

San Fernando Road/Newhall Avenue
Roundabout Feasibility Study I Santa
Clarita, CA I City of Santa Clarita I
Transportation Planner: Responsible for
determining the alternatives and modeling
for the feasibility of a roundabout at this
location.

Imola Corridor Complete Streets
Improvement Plan I Napa, CA I Napa
Valley Transportation Authority I Project
Manager: Managed the development of
a 3.5 -mile multimodal complete streets
plan for Imola Avenue. The plan primarily
addressed safety improvements for all
road users and improved pedestrian
and bicyclist mobility. Coordinated plan
development with agency and community
stakeholders to ensure a community -
driven process, then prioritized and
programmed improvements according to
measures of effectiveness, such as cost -
benefit, constructibility, and environmental
stewardship.

Rocklin Road Complete Street
Roundabout Corridor Master Plan
I Rocklin, CA I City of Rocklin I
Why Todd?
a Specializes in transportation planning
and programming
LS Prepares transportation studies, grant
applications
D Provides peer reviews, review of
impact studies, and develops CEQA
impact analyses
Years of Experience
17 Education/Accreditations
- BS, Community and Regional
Development, University of California,
Davis
- AICP, #29678
Transportation Planner: Responsible for
corridor alternatives testing, modeling,
microsimulation, and capacity analysis
for a complete street corridor through six
intersections including two I-80 freeway
ramp intersections.

Sacramento Avenue Complete
Street Corridor Improvement Plan
(CSCIP) I West Sacramento, CA I
City of West Sacramento I Project
Director: Overseeing preparation of the
Sacramento Avenue CSCIP that aims
to deliver a transformative vision for
the communities it serves. The CSCIP
includes a robust trilingual hybrid public
engagement program, streetscape
improvement concepts, separate zoning
and infrastructure planning studies.

Page 1347 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
49 Assistant Project Manager
Erin McPherson's quick grasp of difficult
issues has driven her 15 years of roadway
design work in California. She is a star
problem -solver, especially for complex
projects with compressed schedules
requiring Caltrans coordination and design
manual knowledge. With experience in
construction inspection, she understands
constructibility, foresees potential problems
and safety concerns, and adjusts the design
to avoid delays and change orders. Erin
develops staging plans and SWPPPs to
reduce traffic and environmental impacts
selects materials and structures for
flooplain crossings, and designs grading,
drainage, and utilities plans. Experienced
with habitat plans, she is aware of local
environmental constraints and community
concerns.

Relevant Experience
Milpas Street Crosswalk and Sidewalk
ATP Project I Santa Barbara, CA I City
of Santa Barbara I Assistant Project
Manager: For this Cycle 6 ATP grant,
serving as Assistant Project Manager for
the design of nine blocks of intersection
improvements in the main east side arterial
street, Milpas Street. Improvements include
safety enhancements: new curb extensions,
high visibility crosswalks, additional lighting,
accessibility improvements, widened
sidewalks at street corners and transit
stops, leading pedestrian intervals at
signalized intersections, mast arm mounted
Rectangular Rapid Flashing Beacons, and a
median refuge island at one non -signalized
intersection. Three -foot -wide buffers will
be added to bike lanes between Cota and
Canon Perdido Streets to improve cyclist
safety, and additional bicycle parking.

Shoreline Drive Realignment I Long
Beach, CA I City of Long Beach I Lead
Designer: Served as Lead Designer for
the $65 million construction project
involving the realignment of northbound
and southbound Shoreline Drive under the
existing Ocean Boulevard Overcrossing,
ensuring streamlined traffic flow and
structural integrity. Involved in the
extension of Broadway to Shoreline,
forming a new signalized intersection to
improve traffic management. Led the
reconstruction of Broadway from Shoreline
to Maine, including the demolition of the
existing bridge to accommodate the new
infrastructure. Helped implement Class
I Bike Paths along Golden Shore and
Broadway, providing connectivity to the
LARIO Trail and proposing Drake/Chavez
Soccer Fields, promoting sustainable
transportation solutions. Involved in
facilitating the conveyance systems for
stormwater and reclaimed water, ensuring
efficient flow and connection to the LB
MUST via the future Shoemaker Bridge
project.

FORTAG (California Avenue Segment) I
Monterey County, CA I TAMC I Project
Designer: Responsible for overall PS&E,
Why Erin?
O Roadway design and understanding of
design standards in California
51 Works with the local community to
address their concerns
Years of Experience
17 Education/Accreditations
- BS, Civil Engineering, California State
University, Sacramento
- PE, CA #91111
environmental addendum, R/W, utility
clearance, local agency and public
stakeholder engagement, for another
segment of the 28 -mile trail. This almost
two-mile trail will connect people to open
spaces and removes barriers to access
for active modes of travel within the
City of Marina and provide connectivity
to a third segment of the trail and to
CSUMB. Responsible for evaluating
concepts to cross the busy Imjin Road
by either a bridge, a protected midblock
crossing, a protected intersection, or at
a "Dutch style" roundabout. The project
also will incorporate a protected bicycle
intersection/signal modification, almost 2.0
miles of Class I pathway, safety through
environmental design, lighting/electrical,
and equestrian accommodation.

SR 57 Northbound Improvement,
(Orangewood to Katella) I Orange
County I Parsons I Erosion Control
Designer: Provided hydraulic analysis for
the Santa Ana River in Orange County,
Stormwater Data Report, and water quality
plan sheets. Project required coordination
with flood control agencies, cities, and
various Caltrans disciplines.

Page 1348 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
50 Engineering
Michael Pitcock works on a variety of
project types including roadway extensions,
widenings, and rehabs; Intersections;
Interchanges and Multimodal improvements.

Michael's primary focuses are alternatives
intersections and California state highway
infrastructure, having worked on more than
30 roundabout projects and dozens of
projects on the California State Highway
System. Michael prepares, concepts,
designs, and documents for all project
phases, from feasibility studies to full PS&E.

Michael specializes in the Caltrans approvals
process having developed multiple PSRs,
PRs, and other memorandums required for
approvals (intersection control evaluation,
DSDDs and Stormwater Data Reports).

Michael uses this experience, across
multiple project phases, to address potential
conflicts in future phases ahead of time,
streamlining other phases.

Relevant Experience
La Quinta Village Complete Street,
Road Diet, ATP I La Quinta, CA I City
of La Quinta I Engineer: Assisted with
the preliminary estimates and design
for three complete street corridors that
would have five roundabouts and several
road diet improvements. Project included
roundabouts, water quality infrastructure,
pedestrian and bicycle facilities, and
landscape/beautification elements.

SR 121 at 8th Street East Intersection
Improvements I Sonoma County, CA
SCTA I Project Engineer: Prepared
Geometric Design for both build
alternatives, including one signalized
alternative and roundabout alternative.

Led the preparation of the PSR-PDS and
numerous project attachments including
the Design Alternatives and the project
cost estimate. This project aims to provide
long awaited improvements to a high traffic
intersection which have been in limbo
for decades. This project is a fast -paced
project aimed to initiate Caltrans oversight
allowing for additional funding to be
pursued to provide longstanding vehicular
and pedestrian traffic improvements to
Sonoma and the surrounding area.

SR 29/SR 221 Interchange, Soscol
Junction I Napa County, CA I NVTA I
Assistant Project Engineer: Assisted
with the preparation of the PA/ED with
Caltrans District 4 for a revision to the
original Caltrans flyover concept to a
diamond interchange at the SR 29 and 221
interchanges, proposing roundabouts for
both ramp intersection. Later, led portions
of design and finalization of the project
during Caltrans' review and approval
process, led preparation of select plan
sheets, including Layout, Construction
Details, and Grading Plans. This is a
high -profile project for Napa Valley
Transportation Authority, as the agency
has been trying to update this integral
intersection for the last decade.

Why Michael?
O Works on roadway projects of all types
throughout California providing PS&E,
PSR, PDS, PR, and other phases
• Worked on more than 30 roundabouts
and California State Highway System
projects
Years of Experience
5 Education/Accreditations
- BS, Civil Engineering, California State
University, Sacramento
- PE, CA #93542
SR 121 Napa 5 -Way Intersection
Improvements I Napa County, CA I City
of Napa I Project Engineer: Leading the
preparation of the design of two modern
roundabouts, replacing the existing,
substandard, signalized intersection at
Route 121, 3rd Street, Coombsville Road,
and East Avenue in the City of Napa. This
project required adherence to the Caltrans
Project Development Procedures Manual,
Highway Design Manual, and other Caltrans
guidelines, to facilitate the completion
of a Project Report under tight schedule
constraints. This project would provide
critical circulation improvements for all
modes of transportation, streamlining
access for nearby businesses and schools.

SR 49 San Andreas Commercial Gateway
I San Andreas, CA I Calaveras County I
Project Engineer: Prepared a PSR-PDS
report and associated appendices for
the SR 49 Commercial Gateway Project,
constructing approximately two miles
of new multimodal facilities and three
intersection improvements in the town of
San Andreas.

Page 1349 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
51 Geometrics (MNS)
Hector Salcedo is an experienced engineer
who understands the key aspects of all
Caltrans project phases. He has experience
working on all three phases of Caltrans
project delivery phases which include
the PID, PA/ED, PS&E. His vast project
experience includes review and preparation
of technical reports and preliminary
geometric designs in the planning and
development of major interchanges
throughout Southern California,
environmental technical studies, utility
coordination, and project coordination.

His recent project experience includes
design on the Interstate 10 Design -Build
Project where he was responsible for a
three-mile segment of roadway modeling
and preparation of over 100 roadway plans
complying to the Caltrans HDM, Standard
Plans and Plan Preparation Manual. Hector
uses his vast experience to ensure the
most practical, and safe designs on his
projects with a full understanding of the
Caltrans delivery process. He has technical
experience with AutoCAD/Civil 3D and
MicroStation/Inroads platforms.

Relevant Experience
First Street Feasibility Study I Beaumont,
CA I City of Beaumont, CA I Project
Manager: MNS developed a feasibility
study along First Street from Beaumont
Avenue to Pennsylvania Avenue analyzing
the impacts, cost and improvements
needed to upgrade First Street to four -lane
facility with sidewalks. This street serves as
a critical connection between Beaumont
Avenue and Pennsylvania Avenue for local
circulation and access to State Route

60. The study focused on the following:
preparing a constraints memorandum
discussing the existing conditions
and determined the potential level of
environmental document needed for
future phases; preparing preliminary design
concepts for the ultimate roadway width
along the corridor; identifying potential
R/W impacts along the corridor; identifying
potential conflicts to existing utilities and
sending out utility as -built requests to
owners; surveying and R/W mapping.

Hollis Street Transit and Pedestrian
Improvements I Emeryville, CA I City
of Emeryville, CA I Assistant Project
Manager: Providing land surveying and
design services along the Hollis Street
corridor between 40th and Powell St.

The project removed a channelized
right -turn lane and required traffic
signal modification. The design consists
of removing two existing signal poles,
installing new signal poles and push button
posts, and confirming ADA compliance
of pedestrian push button locations.

Additional elements include bicycle
and pedestrian improvements such as
bulbout sidewalks, bus pads, dedicated
loading areas to improve transit safety and
efficiency, and pavement/utility upgrades.

Why Hector?
• Experienced roadway engineer
providing local PID, PA/ED, PS&E,
PSR/PDR phase services
O Worked on over 100 roadway plans.

Years of Experience
10 Education/Accreditations
- BS, Civil Engineering/Transportation,
California State Polytechnic University,
Pomona
- PE, CA #90382
Calle Contento and La Serena Way
Roundabouts along Rancho California
Road I Riverside County I RCTD I Project
Manager: Negotiated and established an
approved contract of over $1M, managed
and reviewed subconsulting invoices
and project deliverables, responsible for
overseeing the project schedule to achieve
environmental clearance (CEQA) and final
design approval, communicated monthly
with the county, oversaw the project
design of the roundabouts to ensure
meeting roundabout design standards
and constructability, and provided design
oversight on the roundabout performance
analysis and plan and profile exhibits.

PSR/PDS for SR 60/Redlands Boulevard,
Moreno Valley, CA I City of Moreno
Valley/Caltrans I Roadway Lead: Designed
three interchange alternatives, coordinated
on choosing a locally preferred alternative,
reviewed and coordinated the TEPA/PEAR
Reports, prepared exhibits for a Caltrans
kick-off meeting to introduce alternatives
and schedule, and developed preliminary
cost estimates.

Page 1350 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
52 Environmental
Nicole Greenberg is a skilled professional
in environmental permitting and impact
assessment, specializing in land use
planning and natural resource management.

She develops permit strategies,
streamlines the environmental regulatory
process for clients, and coordinates
their needs with agencies, utilities, and
municipalities. Nicole effectively addresses
permitting requirements for public works
infrastructure, coastal development, and
energy sector projects. Her expertise
includes CEQA and NEPA compliance,
water infrastructure, coastal planning,
energy development, and sustainability.

Relevant Experience
Downtown Beaumont Revitalization Plan
I Beaumont, CA I City of Beaumont
Technical Lead: Conducted a due diligence
review by assessing the City's general plan
and creating an Existing Site Conditions
Report. This Teport evaluates the General
Plan and Program -level Environmental
Impact Report's effectiveness in addressing
potential environmental impacts of the
Downtown Beaumont Revitalization Plan.

It also includes an assessment of potential
future developments in downtown
Beaumont and provides guidance on
reviewing future projects under CEQA.

De Portola/Jedediah Smith Roads
Roundabout I Temecula, CA I City
of Temecula I CEQA and Regulatory
Compliance Lead: Effort included
assessing environmental and community
impacts associated with the roundabout
design for CEQA and NEPA exemptions,
including relevant categorical exemptions
and exclusions. The environmental review,
addressing CEQA and NEPA requirements,
focuses on aesthetics, biological and
cultural resources, safety, and traffic. The
project secured partial funding from a
federal Housing and Urban Development
grant. The project aims to reduce traffic
delays and congestion on De Portola/
Ynez Road, a key artery next to a busy
commercial area. A single -lane roundabout
at the project site will enhance traffic flow,
preserve the rural character, and introduce
traffic calming measures to meet the City's
circulation goals.

Highway iii Corridor Specific Plan I La
Quinta, CA I City of La Quinta I CEQA
Lead: Serving as CEQA Lead and manages
the Draft IS/MND document for this
highway corridor improvement project. The
City of La Quinta is preparing a Specific
Plan and form -based code to facilitate
the establishment of Highway 111 as a
vibrant mixed -use corridor to guide the
orderly development and redevelopment
of local infrastructure, businesses, and
housing. Responsible for tracking project
deliverables, client and project manager
coordination, and task delegation to deliver
the IS/MND document on time and on
budget.

Why Nicole?
0 Worked on transportation projects in
Riverside and San Bernardino Counties
0 Specializes in evironmental permitting
and impact assessment
Years of Experience
13 Education/Accreditations
- MS, Environmental Studies, College of
Charleston
- BS, Marine/Environmental Biology and
Policy, Monmouth University
Randolph Corridor ATP I Commerce, CA
I City of Commerce I CEQA/Regulatory
Compliance Lead: Prepared/submitted the
NOE including cultural records requests to
meet regulatory requirements. The City, in
secured $6,703,891 from the LA Metro for
active transportation upgrades. This project
will enhance Randolph Corridor, improve
connectivity to the LA River and transit
network, and include streetlight upgrades
to fill gaps in biking and walking routes.

Additionally, Nicole coordinates with clients
and participates in progress meetings with
to monitor schedule and budget.

Camp San Luis Obispo Vehicular Bridge
3 Replacement I San Luis Obispo,
CA I California Military Department I
Technical Lead: Managed the Draft and
Final IS/MND document to support CEQA
requirements for this vehicular bridge
replacement project. Project support
included section writing, address comment
responses, and client coordination to track
project milestones in accordance with
CEQA guidelines. Additional responsibilities
included budget tracking, team calibration
meetings, and managed client deliverables.

Page 1351 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
53 MI Urban Design
Jonathan Linkus is GHD's urban design +
planning lead in the Americas. His 14 years
delivering public and private planning
projects are based on thoughtful client and
stakeholder relationships and integrated
thinking across urban scales. His work
pioneers novel community uplift strategies
which have garnered 11 regional, state,
and national planning and civil engineering
awards as lead planner or project manager.

His project types include downtown
specific plans, mixed use university
plans (long range development plans),
community parks, coastal resiliency, and
airport -connected projects.wards as lead
planner or project manager. His project
types include university plans (long range
development plans), mixed -use, downtown
specific plans, community parks, coastal
resiliency, and airport -connected projects.

Relevant Experience
Downtown Revitalization Plan I
Beaumont, CA I City of Beaumont I
Project Manager/Lead Planner: Served
as Project Manager/Lead Planner for 506 -
acre overlay plan and economic strategy
coordinating detailed urban designs with
guidelines and economically catalyzing CIP.

The City proposed to develop a DBRP along
the 6th Street corridor, which would include
two subdistricts called the Downtown
District and the Extended Sixth Street
District, as well as a north -south corridor
called the Beaumont Avenue District. The
new DBRP would offer economic diversity
and housing/cultural opportunities in a
pedestrian -friendly, mixed -use setting.

GHD was selected to provide services
for the DBRP that included Economic
Development, Planning Commission,
City Council, and Community Visioning
workshops; coordinating and collaborating
with key stakeholders for input; analyzing and
documenting existing conditions; reviewing
current vision concepts and policies and
plans; developing market feasibility strategies
for the implementation plan development,
site recommendations, and strategic market -
driven timing goalposts; providing an initial
draft and final DBRP and implementation
strategy; and developing key visualizations
with published documentation findings.

Downtown Specific Plan I Twentynine
Palms, CA I City of Twentynine Palms I
Project Manager/Lead Planner: Served
as Project Manager/Lead Planner for this
long-range, 210 -acre comprehensive
master plan for economic revitalization of a
liveable, walkable, and vibrant heart of the
community; with two public workshops and
CEQA.

Highway iii Corridor Specific Plan I La
Quinta, CA I City of La Quinta I Lead
Planner/Urban Designer: Served as Lead
Planner/Urban Designer for this 450 -acre
comprehensive master plan for infill mixed -
use development for a liveable and vibrant
heart for the community along a 3.0 -mile
retail corridor.

Why Jonathan?
cg Worked in coordination with the City
on the previous Downtown Beaumont
Revitalization Feasibility Study
O Knows the project area, City standards,
and community wants/needs
Years of Experience
14 Education/Accreditations
- BArch, Architecture, University of Southern
California
- MAUD, Urban Design, Harvard University
- Certified Planner (AICP), #30431
- LEED AP, US Green Building Council
General Plan and Gateway Overlay
I Arcata, CA I City of Arcata I Lead
Planner/Urban Designer: Served as Lead
Planner/Urban Designer for this 52 -acre
conceptual housing (2,500 dwelling units)
and mixed -use development planning
for opportunity sites within the Gateway
Overlay District.

Imola Corridor Complete Street Master
Plan I Napa, CA I City of Napa I Team
Planner/Urban Designer: Responsible for
public outreach visioning guidance and
event participation, conceptual streetscape
design and visualization, and mobility hub
for the 2.5 mile corridor.

Canberra City Centre Transit -Oriented
Study I Canberra, ACT, AU I City
Renewal Authority I Lead Planner/Urban
Designer: Served as Lead Planner/Urban
Designer for a 12 -acre urban concept
that integrates transit infrastructure and
walkable mixed -use development to
activate the heart of Canberra as a national
crossroads.

Page 1352 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
54 Mur ti
Roundabout Design
Ron Boyle serves as lead designer and
provides QA/QC on a variety of public
works and private projects in California,
where his specialties in roundabouts,
interchange, and roadway design are
required. He has over 39 years of design
experience and 32 years of project
management experience and is skillful at
working with state and local agency staff.

Ron has been involved in the planning
design or construction of over 100
roundabouts, many of which were the
first of their type in communities requiring
extensive public outreach. In addition to
playing a lead role on projects, he provides
peer review of roundabout projects,
including those developed by private
developers, local agencies, and Caltrans.

Relevant Experience
Downtown Revitalization Plan I
Beaumont, CA I City of Beaumont I
Roundabout Alternative Designer:

Served as Roundabout Designer for this
506 -acre overlay plan and economic
strategy coordinating detailed urban
designs with guidelines and economically
catalyzing CIP.

La Quinta Village Complete Street, Road
Diet, ATP I La Quinta, CA I City of La
Quinta I QC/Design Review: Reviewed
the preparation of three complete street
corridors including five roundabouts, a
road diet to reduce travel lanes to provide
bicycle lanes, and various pedestrian
crossing improvements outlined in the ATP
grant application.

SR 29/SR 221 Interchange - Soscol
Junction I Napa County, C I NVTA I
Lead Designer: Developed geometrics
for a new local interchange adjacent to an
existing freeway -to -freeway interchange.

Project entailed the horizontal and vertical
relocation of SR 29 to facilitate stage
construction of two multi -lane roundabouts
and new freeway on- and off -ramps.

Roundabout at 40th Street East/
East Avenue S-8 I Palmdale, CA I JT
Engineering I Roundabout Designer:

Prepared roundabout geometrics for a new
hybrid lane roundabout at this semi -rural
intersection with high-speed approaches.

Rocklin Road Complete Street
Roundabout Corridor Improvement I
Rocklin, CA I City of Rocklin I Project
Manager/Lead Designer: Project entailed
a complete street corridor through six
intersections, including two I-80 freeway
ramp intersections. The corridor was
divided into three projects, each utilizing
federal CMAQ funds and included
extensive public outreach, right of way
acquisitions, and utility relocations.

Tank Farm Road at Orcutt Road
Roundabout I San Luis Obispo, CA I
City of San Luis Obispo I Roundabout
Designer: Prepared roundabout
geometrics for a new single -lane
Why Ron?
0 Specializes in roundabouts,
interchanges, and roadway design
IS Worked on over 100 roundabouts,
many being the first of their type in
communities requiring extensive public
outreach
Years of Experience
42 Education/Accreditations
- BS, Civil Engineering, California State
Polytechnic University, San Luis Obispo
- PE, CA #46387
roundabout at this semi -rural intersection
with high-speed approaches.

SR 29, First Street, and Second Street
Roundabouts along California Boulevard
I Napa, CA I City of Napa I Project
Manager/Lead Designer: Performed
project management, public outreach,
and led design and plan production for
three closely spaced roundabouts at SR
29 and First Street northbound ramps
and California Boulevard at First Street
and Second Street. Plans were processed
through Caltrans Office Engineer and
construction was completed in 2019 at a
cost of $11.2 million.

I-5/Deschutes Road Roundabout
Interchange Reconstruction PA/ED,
PSR, PR, PS&E, and CM I Anderson, CA
I City of Anderson I QC/Design Review:

Performed the geometric layouts and the
overall quality control for the freeway ramp
modifications, deep utility construction,
and staged construction/traffic handling
plans on a roundabout with five -legs and
new northbound off -ramp.

Page 1353 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
55 Landscape Architecture/Irrigation
Lucas Piper has over 17 years of design
and project management experience.

He has worked on a wide variety of
projects ranging from roadway corridors,
intersections, parks and trails, and habitat
restoration. Lucas is a qualified QSD/P
and has worked on several stormwater
pollution management, stabilization, and
LID projects. He is experienced in a wide
range of design and consulting processes
and services including site analysis and
planning, geospatial analysis, conceptual
design development, 3D renderings, public
outreach, construction PS&E, and SWPPPs.

Relevant Experience
Downtown Revitalization Plan I
Beaumont, CA I City of Beaumont I
Landscape Architect: Served as the
Landscape Architect for this 506 -acre
overlay plan and economic strategy
coordinating detailed urban designs with
guidelines and economically catalyzing CIP.

La Quinta Complete Streets, Road Diet,
ATP I La Quinta, CA I City of La Quinta I
Landscape Architect: Assisted in the
preparation of the streetscape design for
five roundabouts and half mile of roadway.

Desert plant materials, indigenous or
adaptable to the area were incorporated
in the design. Water quality swales/basins
were incorporated in many of the parkway
strips to provide stormwater detention/
water quality BMPs.

Imola Avenue Corridor Complete Street
I Napa, CA I City of Napa I Landscape
Architect: Assisted in the development of
the PS&E package that provided planting/
irrigation in four existing medians on a
City roadway gateway. Plant materials
were selected for their sustainability, low
maintenance, and color/texture. Provided
construction level PS&E that would provide
an inviting roadway landscape.

Tank Farm/Orcutt Roads Roundabout I
San Luis Obispo, CA I City of San Luis
Obispo I Landscape Architect: Served
as Landscape Architect of Record for
the preparation of the landscape PS&E
documents. Assisted with LID water
detention basin planning/design as well as
erosion control seeding and BMP design.

Unique challenges included the use and
modification of existing City irrigation
smart controllers and satisfying required
water detention needs.

Artesia Great Boulevard Complete
Streets I Long Beach, CA I City of Long
Beach I Landscape Architect: Project
addresses ongoing vehicular congestion
issues and improves bicycle, pedestrian,
and transit elements through a complete
street upgrade of 1.2 miles of an urban
arterial boulevard. Responsible for
assisting in the development of landscape
architecture construction documents for
roadway medians/adjacent parkways.

Work included planting, irrigation, and site
Why Lucas?
p Experience working on roadway
corridors, intersections, roundabouts,
and complete streets
p Provides site analysis, planning,
geospatial analysis, conceptual design,
3D renderings, and public outreach
Years of Experience
17 Education/Accreditations
- BArch, Landscape Architecture, University
of Oregon
- PLA, CA #5873
- QSD/P, CA #25768
furnishing design. Additional responsibilities
include QA/QC review and approval.

Avenue 64 Complete Streets I Pasadena,
CA I City of Pasadena I Landscape
Architect: Provided Landscape
Architecture design support to improve
the safety of the intersection, while the
proposed landscape design and plant
material choices looked to transform a
field of concrete to a safer and sustainable
intersection. Primary responsibilities
included design support, QA/QC review,
and bid/construction services.

Shoreline Drive Realignment I Long
Beach, CA I City of Long Beach I
Landscape Architect/QA/QC: Project
includes realignment of southern terminus
of I-710 into Downtown Long Beach.

Responsible for developing planting/
irrigation concept and construction
documents for roadway medians, LID water
quality basins, and multi -use trail segments.

Page 1354 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
56 Byung Lee has 23 years of experience providing traffic operations, traffic engineering design, and ITS engineering design for projects throughout the State. His experience covers a wide range of project types including signal design, lighting design, signing & striping plans, traffic operations, and safety analyses. Byung has extensive hands-on experience in traffic operations/microsimulation models, including Synchro, SimTraffic, and VISSIM. Byung is also adept at preparing documents for changes to existing at -grade crossings, such as General Order 88B required by the CPUC.

Years of Experience: 23
Education/Accreditations
- MS, Environmental Engineering, University of California, Berkeley - PE, CA #90221; TE, CA #2908
Relevant Experience:

Artesia Great Boulevard Improvements I Long Beach, CA
I City of Long Beach I Traffic Engineer: Served as Project Traffic Engineer responsible for traffic signal modification plans for 12 traffic signals along the corridor with the addition of bicycle facility, pedestrian safety, and transit improvements.

The improvements consist of Adaptive Traffic Control System signal enhancements, pedestrian improvements at all pedestrian crossings, Class II bike lanes between Atlantic Avenue and Susana Road, and variety of improvements including upgraded street lighting, improved bus shelters, and bulbouts.

Clements Avenue Complete Street I Alameda, CA I City of Alameda I Project Manager: Prepared traffic signal modifications to include bike signals, rectangular rapid flashing beacons, and PS&E.

Ukiah Streetscape and Road Diet - Phase 2 I Ukiah, CA I Traffic Engineer I Traffic Engineer: Responsible for traffic signal modifications for this federally, state and locally funded project as part of a road diet through the downtown. The project reduced travel lanes, improving parking and pedestrian improvements, added landscaping, and rebuilding the roadway.

M i.i f a `ail
4 7�
Erik Fanselau's 25 years of civil engineering experience includes design, project management, utility coordination, and construction management with transportation and water resources projects. His expertise in hydrology/hydraulics covers drainage system analysis, water quality treatment, and erosion control, often involving basin delineation and peak flow determination using calculations and modeling software, such as StormCAD, EPA-SWMM, and HEC-RAS.

Years of Experience: 25
Education/Accreditations
- BS, Civil Engineering, California State University, Sacramento - PE, CA #64814; CFM, US #7220, QSD/P, LEED AP #10591588 Relevant Experience:

West Texas Street Improvements I Fairfield, CA I City of Fairfield I Water Quality Discipline Lead
Served as Water Quality Discipline Lead for 4,900 feet of road reconstruction and bicycle and pedestrian improvements. The design required a unique solution to incorporate permanent water quality treatment without dramatically changing the project.

Bioretention treatment was incorporated into the proposed landscape planters.

Great Artesia Blvd. I Long Beach, CA I City of Long Beach I Drainage Lead: Served as Drainage Lead for three miles of bus stop and pedestrian improvements along Artesia Boulevard between Harbor Avenue and Downey Avenue. Work included a drainage analysis, water quality design, and custom drainage inlet design.

Shoreline Drive Improvements I Long Beach, CA I City of Long Beach I Drainage Lead: Served as Drainage Discipline Lead for the redesign and reconstruction of the western portion of Shoreline Drive in the vicinity of the 710 Freeway and Cesar Chavez Park in Long Beach. Roads will be reconstructed, trails created, water quality added, relocation of major utilities, and bike and pedestrian facilities created.

Page 1355 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
57 }uauaZiuivao3 AG MO d MU 4-
saoinaa g }o a dooS IIflJ
V �J

Q JL _J/A-\©
^1
r -
I L J
Full Scope of Services
-Scope of Services Tasks
Task 1: Project Management
GHD will be responsible for the general project management, project coordination, monitoring project progress for adherence to schedule and budget, reporting project progress and
administering the project, including interfacing with the City of Beaumont and the various project stakeholders. More
specifically, GHD will:

Subtask 1.1: Quality Management
GHD will prepare a Quality Management Plan (QMP) that
will generally follow the current Caltrans QMP guidance and template. GHD will conduct Quality Assurance and Quality Control (QA/QC) for the project and conduct QA/QC reviews of all documents, including documents prepared by our teaming partners throughout the project. It is assumed one draft QMP will be prepared, comments will be addressed, and the report will be finalized by GHD and the City of Beaumont.

Deliverables: Quality Management Plan (QMP) in .doc and .pdf format.

Subtask 1.2: Project Management and
Administration
This task will include the supervision and scheduling of project staff, review of work prepared by GHD staff and subconsultants, project coordination, client liaison, and schedule and budget monitoring.

1.2.1: Project Management and Administration
Upon Notice to Proceed (NTP), GHD will prepare a Project Management Plan (PMP) that will include a detailed
scope, schedule, and budget in accordance with the final 4 Scope of Services Overview
Our full scope of services with deliverables and assumptions included is provided in this attachment section. Considerable time has been taken to meticulously craft this scope, ensuring that our team has prepared a "right -sized" scope aimed at delivering a final product that will set the City up for successful grant applications. Our goal is to clearly convey the need and the proposed solution to stakeholders, decision -makers, and the community.

Page 135 ends

ATTACHMENT - Full Scope of Services 159

signed contract. The PMP will detail
communication and data sharing processes
as well as the data collection, engagement,
and analysis tasks. The PMP will also
specify mapping outputs and templates for
project deliverables. The PMP schedule
will note major milestones, deliverables and
meetings, and estimate engagement events.

While this is an added step in the
project management process, our prior
project experience shows that having
this document enhances the effective
management of the project from both our
and our clients' perspectives.

To be more efficient with CVAG's partner
agencies' resources, GHD recommends
identifying a Project Development
Team (PDT) that will include the City's
project manager, representatives from
other City departments, and other
stakeholders identified by the City and
GHD. The PDT will be incorporated into
the project administration as needed. PDT
development and engagement is described
in Task 1.3.1 below.

GHD will manage the preparation of
invoices and progress reports monthly. The
monthly progress reports will summarize
budget, schedule status, and identify any
project issues requiring attention by the
City. Other project management activities
include coordinating meetings, scheduling
and managing staff, and overseeing the
quality assurance effort.

GHD will monitor work progress and budget
expended against the level of completion
from the original task assignment.

Deliverables:
- Project Management Plan (PMP)
- Monthly Invoicing/Progress Reports
- Project Schedule
- Monthly Updates

1.2.2: Meetings and Coordination
GHD's Project Manager, relevant lead, and
select team members will organize and
attend the following meetings (held virtually
unless otherwise noted):
- Project kick-off meeting held in -person
at the City with GHD leadership, including
Lindsey Van Parys, Steven Latino, Erin
McPherson and Todd Tregenza
- PDT meetings with the City, and other
agency/stakeholder representatives,
which will be scheduled to be conducted
once per month (our scope assumes
17 meetings)
- Bi-weekly 30 -minute check -in meetings
with City staff (our scope assumes 34
bi-weekly check -ins)
GHD will coordinate, schedule, and
facilitate meetings, which includes
preparing PDT meeting notes and project
schedule updates. GHD staff will provide
meeting agendas with a minimum of two
(2) working days prior to meetings. Draft
meeting minutes will be submitted within
three (3) working days following each
meeting. Within three (3) working days of
receiving City and stakeholder's comments,
these comments will be incorporated and
final minutes published for distribution and
record.

Deliverables:
- Meeting Agendas
- Draft and Final Meeting Minutes
Assumptions and Exclusions:
- Scope assumes up to 16 meetings.

Kick-off meeting will be in person. Other
meetings will be virtual.

Page 1358 of 18 ends

- Scope assumes 32 bi-weekly check ins.

Check ins will be held virtually
Subtask 1.3: Community and
Stakeholder Engagement
Subtask 1.3.1: Stakeholder Engagement
Plan and Stakeholder Database
Our team will develop a comprehensive
Stakeholder Engagement Plan (SEP)
to support the project and generate
meaningful input from key stakeholders
within the project area. The SEP will
describe the engagement goals, propose
engagement tactics, timeline, and
stakeholder audience. The SEP will act as
a flexible blueprint, ensuring proactive and
strategic stakeholder engagement. It will be
responsive to the project's needs, allowing
for adjustments in approach if certain
stakeholders and community segments
are not being adequately reached. At a
minimum, the engagement plan will identify:
- Engagement goals
- Overall engagement timeline
- List of stakeholder audience and their
level of involvement
- Project messaging and
communication strategy
- Proposed list of engagement tactics
and activities
Our team will also maintain a stakeholder
database, building from our previous
experience with the DBRP. The database
will comprise of the City as well as key
stakeholder groups within the project area
including civic groups, local community -
based organizations (CBOs), regional
institutions, public agencies, residents,
businesses, and mobility advocacy groups.

The database will also include relevant
departments for all regional partner
PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
60 agencies. GHD will facilitate an "opt -
in" campaign to gather and update the
database throughout the project.

Deliverables:
- Stakeholder Engagement Plan
- Stakeholder Database

1.3.2: Project Collateral, Templates,
Outreach Notifications and
Communications
Our team will develop a project style
guide that includes a logo, color palette,
fonts, and other key document design
elements that can be applied to outreach
materials, factsheets, website content,
digital/social content, and project reports
and presentations. GHD will also develop
a template for project related PowerPoint
presentations.

Our team will develop the following
outreach notification and communication
material. GHD will be responsible for the
design of collateral. For printed materials,
GHD will provide digital files to the City for
plotting, printing and/or physical mailing.
- E-blasts/Meeting Invitations: Our
team will use e -blasts to engage
stakeholders listed in the project database
leading up to public workshops and
stakeholder meetings.
- Fact Sheet and Workshop Flyers: Our
team will design a project fact sheet and
two flyers to provide an overview of the
project and promote attendance at public
workshops.

All materials will ensure accessibility,
including translation to Spanish.

Deliverables: E-blast/Meeting Invitations,
Fact Sheets, and Workshop Flyers

1.3.3: Engagement Activities
As mentioned above, our team will create
an engagement strategy that aligns with
the project's engagement goals, such
as garnering project support, soliciting
feedback from key stakeholders, and
understanding operational needs and
concerns. The engagement strategy
will also include proposed engagement
activities to achieve the engagement goals,
subject to City approval, GHD will facilitate
up to two (2) focused workshop/interview
with key stakeholders (i.e. businesses,
property owners, community -based -
organizations), up to two (2) pop-up events
at high -traffic local events/locations, and
up to two (2) board/public presentations
(i.e. City Council, Planning Commission,
or advisory meetings). All activities are
assumed to occur virtually.

GHD will work with the City to plan all
logistics including venue coordination and
set up and will coordinate with the project
team to support the development of
workshop materials and summaries.

Deliverables:
- Up to two (2) key stakeholder
workshops/interviews
- Up to two (2) pop-up events
- Up to two (2) board/public presentations
Task 2: Data Gathering and
Analysis
Under this task, data and information will be
collected and planning level base mapping
will be prepared. GHD understands that
the City is expecting the work plan to
incorporate the collection of any required
data not already available.

Subtask Task 2.1: Existing Data
Collection
GHD will collect readily available project
and location data. The types of information
collected will include:
- Photos, observations, and features based
on a field review
- GIS data
Existing planning and
environmental studies
- Regional plans
- City general plan
- Previous traffic forecasts
- Previous conceptual design drawings
- Existing mapping
- As -built plans
- Utility maps
- Record improvement drawings
and reports
- Floodplain mapping
- SWITRS collision data
- City collision data (Crossroads database)
- Right-of-way (R/W) mapping and
monument records maps
Subtask 2.2: Field Investigations
In addition to collecting all the above -
mentioned data, our team will conduct a
site visit to investigate existing conditions.

During this visit, the team will bring a smart
level and check existing ADA improvements
to identify any deficiencies that may need
to be addressed .

Subtask 2.3: Environmental Review
Review and analyze all relevant planning
and design documents provided by the
City, including previous studies, planning
efforts, and community vision plans.

Conduct a detailed review of existing
land uses and environmental constraints,
including an overview of the project
under CEQA, to identify items that may

Page 1359 of 180 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
61 impact future development. Evaluate the
following key reference documents:
• DBRP - Elevate 2025
2040 General Plan Program
Environmental Impact Report (PEIR)
General Plan and Downtown Zoning
Ordinance
- Identify gaps, nconsistencies, or areas
requiring additional analysis to inform
PDR development.
- Evaluate potential permitting challenges,
policy conflicts, and mitigation needs from
an environmental planning perspective.

Deliverables: One (1) electronic copy
(PDF) of an Environmental Review
Summary to be included in the PDR.

Includes one (1) round of City comments
to be incorporated into the final PDR.

Assumptions and Exclusions:
- Land use and building permit reviews
would be addressed by the construction
contractor and are not evaluated under
this scope.
- The City will provide all relevant
background documents, including
prior planning studies, environmental
documents, and zoning regulations, in a
timely manner.
- The environmental review will be limited
to a high-level screening based on
available public and City -provided data;
no new field surveys, detailed modeling,
or technical reports will be conducted at
this stage.
- The review will not include analysis
of private development proposals
outside of the Downtown Revitalization
Plan boundaries
Task 3: Investigations
Subtask 3.1: Survey and Centerline
Control

3.1.1: Aerial Photogrammetry & Base
Mapping
GHD's survey team, KDM, will perform
aerial photogrammetry using either manned
aircraft or UAVs to capture detailed images
of downtown Beaumont streets and
corridors. The mapping will be conducted
at a scale of one (1) inch = 40 feet, with a
contour interval of one (1) foot, covering
the entire public R/W plus an additional
10 feet beyond it. All streets and alleys
within the designated project area will
be included, with an option to exclude
alleys if necessary. The orthorectified
color aerial imagery will be processed and
delivered at a 0.2 -foot pixel resolution,
making it suitable for use in renderings
and stakeholder presentations. This
comprehensive approach ensures high -
quality, detailed imagery and mapping data
for the project.

Deliverables:
- Topographic Map (1"=40' w/ one
(1) -foot contours)
- Color Orthophoto Mosaic (CAD
referenced GeoTIFF or equivalent)
Assumptions: No detailed field survey for
sidewalks, ramps, or civil design elements;
no subsurface utility mapping, potholing
or ground augmentation aerial imagery;
mapping assumes adequate visibility
for aerial methods, tree cover or urban
canyon effects may reduce accuracy or
visibility in localized areas.

3.1.2: Survey Control & R/W
Survey control and R/W include three
key tasks: establishing ground control for
photogrammetric processing, surveying
existing centerline monumentation, and
delineating and depicting center lines
and R/W lines. Initially, ground control
points will be set up to ensure accurate
photogrammetric processing, aligning
and scaling aerial imagery to the correct
geographical coordinates. Following
this, sufficient existing centerline
monumentation will be surveyed to
reestablish the record centerline alignment
of mapped streets, ensuring alignment with
historical records. Finally, center lines and
R/W lines will be delineated and depicted
from record documents on the base
mapping, without the need for obtaining
title reports. This comprehensive approach
ensures precise and reliable mapping and
surveying results, essential for planning,
development, and legal purposes.

Deliverables:
- Centerline and R/W Base Map (1'=40)
- Survey Control Report
Subtask 3.2: R/W Analysis
GHD will perform a comprehensive
R/W Analysis based on the information
collected from the Topographic Survey
and Centerline Control. This analysis aims
to identify the existing R/W and proposed
R/W boundaries within the project area.

Deliverables: Technical Memorandum
detailing findings of the R/W Analysis/R/W
plan illustrating existing and proposed R/W
boundaries.

Assumptions:
- Legals and Plats will not be prepared

Page 1360 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
62 - Adequate R/W data will be collected
under the survey task
- Title Reports are not included in this task
at this time
Subtask 3.3: Utility Research
(T2UE)
T2UE will utilize the Cl/ASCE 38-22
standards for collecting and depicting
subsurface utilities. This approach will help
build a comprehensive utility model of the
project site. Generally, the investigation will
provide Quality Level D and C with some
Level B to be collected in key locations.

This scope includes R/W to R/W along
Beaumont Avenue and East 6th Street,
approximately 10,000 If.

T2UE will generate record requests
to the various utility companies using
Underground Servicer Alert Design Ticket
Request Systems, track correspondence
and create records, file electronic drawings,
create a utility base map, and depict
overhead facilities.

Subtask 3.4: Geotechnical
Investigation
Geocon will undertake a comprehensive
geotechnical investigation as part of the
Downtown Beaumont Revitalization project.

This investigation will include reviewing
available geologic and as -built information,
performing site reconnaissance, and
coordinating with City representatives
and GHD for encroachment permits and
boring locations. Geocon will hire a drilling
subcontractor to drill up to sixteen (16)
geotechnical borings at various locations
within the project area, ranging from
5 to 20 feet deep. Soil samples will be
collected for laboratory testing to evaluate
pertinent physical and chemical properties.

The findings will be compiled into a
preliminary geotechnical report, which will
include boring logs, geologic conditions,
laboratory test results, and preliminary
recommendations for project planning and
design.

Deliverables:
- Boring Location Exhibit
- Laboratory Test Results
- Preliminary Geotechnical Report
Assumptions:
- Access to core/boring locations during
regular business hours (7.00 am to 5:00
pm) Monday through Friday. No night or
weekend work
- Manned traffic control will not
be required
- Traffic control will be per 2024
Watchbook Manual
- Encroachment Permit will be no fee.

Subtask 3.5: Hydrological/Drainage
Assessment
As part of the PDR, GHD will prepare
a preliminary drainage design and
floodplain assessment of the proposed
improvements. The results of this analysis
will be summarized in the PDR narrative.

Detailed calculations will not be performed
until a preferred alternative is selected and
the design is advanced to the 65% level.

The analysis in this task will include the
following:
- Site visitto review the existing drainage
system.
- Review of existing facility information such
as drainage facility maps, as-builts, etc.

FEMA floodplain determination and
analysis of impact to the project, if any.
- Determination of applicable drainage and
water quality design standards including
peak storm event requirements, likely to
include both the 10- and 100 -year events.
- Determination of location of receiving
system for the project drainage.
- Initial assessment of the tributary areas for
both onsite and offsite runoff. Iden
- tification, to the extent possible, of any
known problems.
- Discussion with City staff regarding
existing drainage system issues.
- Development of the proposed design
methodology for final design.

Deliverables: Preliminary Drainage/
Floodplain Assessment
Subtask 3.6: Traffic Studies and
Assessments

3.6.1; Gather Existing Conditions Data
GHD, in partnership with the City's team,
will work together to assemble Geographic
Information System (GIS) and multimodal
transportation data. This includes compiling
and reviewing existing transportation, land
use, and mapping data for the project area.

GHD will also gather available traffic volume
data provided by the City, Caltrans, and
relevant traffic information that is available
on SWITRS and TIMS. The information
collected under this task will be used to
prepare GIS figures that clearly present the
data.

GHD will use a combination of field data
collection and past document review
to better understand issues related to
active transportation along the corridor.

Maps showing existing and proposed
classification maps for the study corridor
will be assembled. GHD also maintains
access to the Replica platform, which
provides derived mobility information

Page 1361 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
63 such as travel origins and destinations, trip
purposes, and trip modes from anonymized
mobile sources. This information will
be available to enhance field -collected
information and outputs from the available
travel demand models with "big picture"
real -world travel information. GHD will
prepare an existing conditions memo which
will include a description of the corridor,
multimodal facilities, collision history and
identify any deficiencies.

3.6.2: Design Year Conditions
For this study, GHD will obtain the most
current version of the relevant Travel
Demand Model (TMD). GHD will review the
current and future land use assumptions,
both within the project area. Additionally,
GHD will verify the highway network
coding within the project study area for
the existing and future year networks to
ensure that they are consistent with future
year circulation and land development
assumptions.

Opening Year forecasts will also be
developed using straight line interpolation
between Existing and Design Year volumes.

3.6.3: Transportation Operations
Traffic operations will be performed for all
modes of travel for the Existing, Opening
Year and "No -Build" conditions. Although
Highway Capacity Manual 6th Edition
provides multimodal level -of -service
(MMLOS) methodologies, the analysis steps
are relatively data -intensive and may yield
counterintuitive results. GHD proposes the
Plan instead focus on assessing level of
traffic stress (LTS). LTS, as developed by
the Mineta Transportation Institute and San
Jose State University, quantifies the level of
discomfort experience by bicyclists based
on the speed and volume of traffic, their
separation from vehicles, and frequency
of conflict points on roadways and through
intersections. GHD will document bicycle
and pedestrian LTS along the corridor, and
through each study intersection, before
and after improvement. The resulting LTS
maps and analysis can be used to evaluate
proposed concepts for their ability to
improve safe non -motorized access
between community points of interest like
schools, shops, services, parks, transit, and
other important destinations.

Subtask 3.7: Street and Pedestrian
Lighting Analysis
MNS will complete the Street and
Pedestrian lighting analysis which will
focus on approximately four blocks along
6th Street, between California and Palm
Avenue. It will also cover approximately
six (6) blocks along Beaumont Avenue,
between 5th and 11th Streets. This area
will include pedestrian -scale lighting, such
as bollards and decorative lighting fixtures,
designed to enhance safety, aesthetics
and create an inviting atmosphere. Specific
emphasis will be placed on ensuring that
lighting solutions meet the aesthetic and
functional needs of the downtown area.

A photometric analysis of the existing
condition and proposed conditions will be
developed to highlight deficiencies and
improvements.

Lighting Standards: The lighting design
will be based on the RP -8-22 standard,
which provides guidelines for roadway
and walkway lighting. This will ensure that
the proposed lighting meets the required
levels of illumination, uniformity, and energy
efficiency appropriate for pedestrian
pathways, public spaces, and downtown
corridors. The study will evaluate fixture
types, placement, and spacing in line with
this standard to achieve optimal safety and
visual appeal.

Deliverables: Preliminary Lighting
Study documenting key findings
and recommendations technical
memorandum. It will include a photometric
analysis of the existing and proposed
conditions. The memorandum will highlight
energy -efficient recommendations in
line with local and industry standards,
including the use of LED fixtures where
applicable.

Subtask 3.8: Tree Impact Analysis
GHD's certified arborist will perform a
tree impact analysis for the projects and
streetscape corridors identified in The
DBRP and as listed below. Where proposed
improvements overlap existing trees or
where new trees are proposed, resulting
impacts and potential associated costs
will be analyzed. Cost impacts of new
shade trees will also include a summary
table of urban tree planting strategies to
mitigate tree root and hardscape conflicts
and maximize health of the future urban
canopy.

GHD will define and determine the impacts
of adding and removing trees in the
following proposed improvement areas:

Proposal revitalization hubs
Proposed private developments
• 6th Street and California Avenue
• 6th Street and Magnolia Avenue
• 6th Street and Maple Avenue
Walkable Housing Projects
Downtown Mobility Projects
• 6th Street reconfigurations
• Gateway roundabouts
• Beaumont Avenue reconfigurations
• downtown alleys

Page 1362 of 189 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
64 - Proposed parking reconfigurations
(general impacts and recommendations
for new tree planting)
- Stewart Park
The Tree Impact Analysis will include up
to two (2) site visits by an ISA Certified
Arborist who will perform a walk -by limited
visual assessment of accessible existing
trees in the proposed improvement areas.

The visual assessment will focus on the
following attributes:
- Overall tree health
- Tree structure
- Obvious defects or impacts to existing
hardscape.

Deliverables: Results of the Impacted
Trees Analysis and on -site tree
assessments will be documented and
summarized in a Technical Memorandum
(TM) Results of the Impacted Trees
Analysis will be incorporated into the PDR
(Task 5) and PDS (Task 4).

Assumptions and Exclusions:
- Limited visual assessment of existing
trees will be limited to accessible trees
within the project area
- Trees behind fencing or on private
property will not be assessed
- Tree analysis excludes tree risk
assessments
- Geo-location of existing trees
is excluded.
- For budgeting purposes, it is assumed
that the TM will result in one draft
submittal and one round of comments
from the City and a final TM submittal
Task 4: Design Options
Subtask 4.1: Design Options
for Roadway Improvements
(Conceptual Design)
With the information and results from
the Data Gathering and Analysis (Task 2)
and the Investigations (Task 3) GHD to
review and evaluate three alternatives. The
approximate length of new roadway along
6th street is 6,000 If from Veile Avenue to
Pennsylvania Avenue and 3,300 linear feet
along Beaumont Avenue from E. 5th Street
to 11th Street. GHD will prepare three
(3) memorandums to share with project
stakeholders. The evaluation may consider
important design features including
adjacent R/W, sensitive environmental
resources, planned and proposed purpose,
need, synergies and overlap, connections
to key locations, access, and other
considerations in coordination with the
CITY.

GHD will prepare concept level plans
(equivalent to 10 percent) using Autodesk
Civil 3D 2025 and utilizing GHD CAD
standards. This will be achieved by
development of two (2) strip maps per
alternative to showcase planned corridor
improvements, one (1) along 6th Street
and one (1) along Beaumont Avenue for
each alternative. These strip maps will show
hardscape improvements, one to two (1-2)
typical roadway sections, striping, parking,
and GIS level utilities. These documents
will be used as attachments in the PDR
to highlight reasoning for the preferred
alternative.

4.1.1: Preliminary Sketch Mark Ups
(Optional)
GHD to provide preliminary design sketch
mark ups of revitalization hubs included in
the DBRP, September 2024.
- 6th Street and N. California Avenue
- 6th Street and Magnolia Avenue
- Beaumont Avenue and 8th Street
Deliverables:
- Three (3) Alternative Analysis
Memorandums (electronic PDF)
- Two (2) Strip Maps per alternative
totalling six (6) Strip Maps
(electronic PDFs)
Assumptions and Exclusions:
- It is assumed that no Freeway on/off-
ramp modifications will be needed.
- For budgeting purposes, it is assumed
that this analysis will result in one round
of comments from the City, which will
eliminate two (2) of the alternatives and
provide a preferred alternative moving
forward to the 30% design phase.
- It is assumed that the optional task will be
negotiated under a contract amendment,
if requested by the City
Subtask 4.2: Lighting Design
Options
Using the information compiled in Task

3.7, MNS will develop a minimum of three
(3) distinct lighting design options for the
downtown area that align with the goals
outlined in the DBRP. Each option will
be fully informed by the lighting analysis
and will include both engineering and
aesthetic considerations, such as fixture
type, placement, intensity, and visual
character. To support the City's review and
decision -making process, each option will
be presented using large-scale, full -color

Page 1363 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
65 renderings that depict lighting impacts
and design intent within key areas of
downtown. In addition, we will provide up
to five physical architectural color boards
per option to showcase material finishes,
fixture types, and thematic concepts.

A preliminary cost estimate will also be
included for each alternative to help
evaluate feasibility within future budget
planning. Final design concepts will be
submitted to the City for feedback prior to
down -selection.

Deliverables:
- Three (3) Preliminary Lighting Design
Options each option to include
engineering -based and aesthetic
strategies using roll plots. Integration
of fixture types, materials, pole styles,
color temperature, and mounting heights.

Emphasis on creating a safe, inviting
atmosphere that supports the City's
revitalization goals.
- Visual Representations in Large-scale,
full -color renderings illustrating lighting
effects and design intent. Up to five
physical architectural color boards
per option to convey material and
finish selection.
- Preliminary Cost Estimates to include
a conceptual -level cost breakdown
for each lighting design option,
including equipment, installation, and
maintenance considerations.

Subtask 4.3: Design Options
for Streetscape Amenities and
Enhancements (Conceptual
Design)
Following the same design parameters
and extents/limitations as identified
under Task 4.1, GHD's landscape
architecture and streetscape design team
will develop concept level (10% design)
rendered streetscape improvement plans,
cross -sections, schedules, and design
descriptions to illustrate sidewalks (colors
and materials); landscaping themes and
plant types; lighting themes, materials,
and types; options for striping, crosswalks,
pedestrian paths, bike lanes, and parking
options (as developed by civil team under
task 4.1); and other site furnishings and
streetscape amenities that will help create
the full picture for each design option.

GHD will develop three (3) design
alternative options that will be applied to
the 6th Street corridor and the Beaumont
Avenue corridor (as defined in task 4.1). The
three (3) design alternative options will be
used to create a complete rendered plan
set package. The rendered plan package
will consist of the following sheets:
- Rendered plan -view drawings, covering
both Beaumont Avenue and 6th Street
• A set of three (3) rendered plan
view sheets for each of the three (3)
alternatives, nine (9) sheets in total
- Render typical cross sections (one for
Beaumont Avenue and one for 6th Street)
• Sections will be developed for each
of the three (3) alternatives
• Three (3) sheets with two (2) typical
illustrative sections per sheet
- Schedule notes sheet(s) for each
alternative design concept that will:

Describe the design intent of the
alternatives
Summarizing potential planting
and irrigation strategies for each
alternative
Preliminary plant and furnishing
material palettes for each alternative
to identify the different styles and
themes.

GHD will provide the City with a draft
version of the rendered plan package for
review and comment. After receiving all
comments from the City, GHD will update
the submittal to reflect the comments
and submit as the final design packages.

These rendered packages will be used
as attachments in the PDR to highlight
reasoning for the preferred alternative.

Deliverables:
- Draft Rendered Plan Package for
each alternative (three separate
alternative packages)
- Final Rendered Plan Package for
each alternative
Assumptions and Exclusions:

It is assumed that no freeway on/off-
ramp modifications will be needed
Plan -view drawings will be 24X36" sheets
at 1"=50' scale
For budgeting purposes, it is assumed
that this analysis will result in one round
of comments from the City which will
eliminate two (2) of the alternatives for
each of the corridors (Beaumont Avenue.
and 6th Street) and provide apreferred
alternative to move forward into 30%
design phase.

Task 5: PDR
Subtask 5.1: PDR
GHD will prepare a PDR for the DBRP, that
is a comprehensive document that outlines
the Project's background, design features,
limitations, and key deliverables. The
Report serves as an executive summary,
providing a detailed overview of the
project's objectives, scope, and anticipated
benefits. It includes several critical
sections such as the Introduction, Project

Page 1364 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
66 Features and Design Criteria, Statement of
Limitations, and Reports and Studies.

The Introduction section summarizes
the project background, description,
and benefits, highlighting the plan's aim
to enhance Beaumont's digital presence
and improve customer engagement. The
Project Features and Design Criteria section
details the design elements described in
the DBRP, including gateway roundabouts,
intersection signalization, raised medians,
landscaping, monument signs, parallel
median parking, bike lanes, and artistic
crosswalks. Additionally, the design criteria
and guidelines from the City's General
Plan and Downtown Zoning Ordinance are
referenced to ensure alignment with the
city's long-term vision.

The Statement of Limitations section
discusses the Project's limitations and
challenges, providing a concise yet detailed
description of each limitation, its origins,
and its impact on the study's findings.

This section also considers whether these
limitations could lead to further research.

The Report appendices will house the
reports and studies and encompasses
the primary deliverables of the Scope
of Work, such as the Preliminary Design
(30%), Preliminary Design Specifications
(PDS), and Preliminary Construction
Schedule. Reference materials and exhibits
are incorporated into the PDR after final
City review and approval. This structured
approach ensures that the PDR provides
a thorough and cohesive overview of the
DBRP, facilitating informed decision -making
and successful project execution.

Deliverables: PDR (in .pdf and .doc format)
Subtask 5.2: Preliminary Design
(30% Plans)
GHD will prepare Preliminary Design
Plans based on the PDR and the DBRP.

These plans will encompass various
elements, including Preliminary Street
Improvement Plans, Sidewalk, Pedestrian
and ADA Improvement Plans, Intersection
Signalization Plans, Street and Pedestrian
Lighting Plans, Signing and Striping Plans
with adequate bicycle lanes, Landscaping
and Irrigation Plans, existing Utility Plans
with noted conflicts, Street Furniture Plans,
Monument and Overhead Sign Plans, and
Wayfinding Signage Plans.

Drawings will be prepared using GHD CAD
standards and City title block in AutoCAD
C3D Version 2025 software at 1"=40' scale.

Please see the items described below for
additional details.

A preliminary sheet list is as follows:

TITLE
Estimated #
of Sheets
Title 1
1 Key Map
1 Project Notes
1 Legend and Abbreviations
1 Survey Control
1 Typical Sections
5 Layout & Striping Plans
18 Utility & Drainage Plans
18 Construction Details
20 Street & Pedestrian Lighting
Plans
10 Traffic Signal Modifications/
Removals
6 Landscaping & Irrigation Plans
18 i ti
@0:

The traffic signal preliminary plans will
include:
- 6th Street & California Avenue:

Roundabout conversion (one signal
removal sheet)
- 6th Street & Palm Avenue: Roundabout
conversion (one signal remval sheet)
- 6th Street & Edgar Avenue: Signal
modification (one sheet)
- 6th Street & Magnolia Avenue: Signal
modification (one sheet)
- Beaumont Avenue & 6th Street: Signal
removal (one sheet)
- Beaumont Avenue & 7th Street: Signal
removal (one sheet)
Subtask 5.2.1: Signal Modifications
and Removals
This component will focus on the removal
of existing traffic signals at specific
intersections and the evaluation of
appropriate modifications for safer, more
pedestrian -friendly crossings at others.

For pedestrian safety, we will also consider
the implementation of H.A.W.K. signals
and Rectangular Rapid Flashing Beacons
(RRFBs) at strategic crossings.

The lighting plans will cover approximately
four blocks along 6th Street, between
California and Palm Avenues. It will also
cover approximately six (6) blocks along
Beaumont Avenue, between 5th and 11th
Streets.
- Six (6) Street and Pedestrian Lighting
Preliminary Plans along 6th Street
- Four (4) Street and Pedestrian Lighting
Preliminary Plans along Beaumont Avenue
The preliminary design plans for the
DBRP should include key features such
as gateway roundabouts, intersection
signalization, raised medians, landscaping,

Page 1365 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
67 monument signs, parallel median parking,
bike lanes, artistic crosswalks and striping,
and wayfinding signage. Additionally, the
plans must show a preliminary assessment
of construction easements needed from
adjacent properties to ensure minimal
disruption to the community and secure
necessary permissions.

5.2.2 Additional Plans (Optional)
Additional plans showing the extent of
areas impacted outside of preliminary
conflict analysis within the adjacent
impacted properties, such as grading to
properly transition new street/sidewalk
grades to existing adjacent property grades
and any improvements that need to be
reconstructed within adjacent properties.

This includes any relocation/reconstruction
of utility service connections, utility
boxes, pull boxes, backflow devices, fire
service connections, mailboxes, and any
other improvements as necessary can be
negotiated under a contract amendment, if
requested by the City. 30% design would
be required for approval prior to start of
work as well as detail of the ground survey
prior to commencement of work.

Deliverables:
- Preliminary 30 % Design Plans for City
review and approval
- Final Preliminary Design Plans will be
incorporated into the PDR in the Exhibit
section.

Assumptions and Exclusions:
- It is assumed all grading related tasks
are understood to be completed to
the extent possible with an aerial
topographical survey
- Utility relocation and reconstruction
plans have been excluded. It is assumed
detailed relocaton and reconstruction
plans will be developed after approval
of the PDS documentation. GHD will
show utility locations and note conflicts
for future negotiations with Utility
Companies.
- It is assumed overhead sign design
and monument design will be at a
planning level and structural design
elements will be excluded. GHD will
show general placement and approved
messaging only.
- It is assumed that the optional task will be
negotiated under a contract amendment,
if requested by the City.

Subtask 5.3: Preliminary Design
Specifications (PDS)
GHD will prepare PDS as part of the project
requirements. This includes incorporating
the general provisions provided by the City,
outlining any specific conditions that apply
to the project, and including additional
conditions that supplement the special
conditions. Additionally, the task requires
detailing the technical requirements for
the project and creating detailed bidding
tables that show bid items, quantities,
estimated unit prices, and total prices. The
specifications must comply with the City's
Standards, Riverside County Transportation
Department Road Improvement Standards
and Specifications, Riverside County Flood
Control and Water Conservation District
Standards, and the Standard Specifications
for Public Works Construction, current
edition. Furthermore, the PDS should
be included in the PDR in the Reference
section.

Deliverables: PDS (in .pdf and .doc
format)
Subtask 5.4: Preliminary
Construction Cost Estimates
GHD will prepare a comprehensive
Construction Cost Estimates in the form of
Bidding Tables, which will include detailed
Bid Items, Quantities, Estimated Unit Prices,
and Total Prices. These tables should
also reflect the Total Construction Cost,
incorporating estimated cost escalation
and contingency factors. Additionally,
our team will attempt to obtain and
include estimated costs, charges, and
fees from utility companies for the work
they will perform. Charges and fees
from regulatory and permitting agencies
should also be shown; if these costs
cannot be obtained, the assumed costs
must be indicated. Estimated costs for
any R/W takes, construction easements,
and work on adjacent private properties
will be incorporated into the estimates.

Furthermore, our team will estimate
soft costs, such as final engineering,
construction management, inspection,
and materials testing/inspection. GHD will
deliver an estimated project budget that
is inclusive of all potential costs, including
any associated costs such as materials
testing and inspection. These Preliminary
Construction Cost Estimates must be
incorporated into the PDR in the Exhibits
section.

Deliverables: Preliminary Construction
Cost Estimates (in .xls format)
Task 6: Environmental Services
(Optional)
GHD will work with the City to complete
an Addendum to the 2040 General Plan
PEIR previously certified for the General
Plan Update. The Addendum to the 2040
General Plan PEIR will be completed

Page 1366 of 183 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
68 in accordance with CEQA Guidelines
(Section 15164 of CEQA guidelines, as
recommended in the DBRP.

Subtask 6.1: Prepare Background
and Project Description
In coordination with the City, GHD will first
prepare a draft Background and Project
Description section of the Addendum,
prior to proceeding with the Addendum
analysis. This iterative process is proposed
to ensure that the Project described in
the Addendum is clear and accurate. The
Background will include a discussion of the
relationship of the 2040 General Plan PEIR
to the DBRP. GHD will submit the Draft to
the City for review.

Deliverables: Draft and Final Background
and Project Description
Assumptions and Exclusions:
- This task includes time for one (1) kick-
off meeting and one (1) review meeting
between City staff and GHD.

GHD can prepare figures to support the
environmental review and will be utilized
in the Addendum
If revisions to the figures are needed
for the context of the Addendum, GHD
assumes the up to one (1) round of review
on figures
After City review of the draft
Background and Project Description,
GHD will incorporate the edits into the
Administrative Draft Addendum under
Task No. 6.2
Subtask 6.2: Prepare PEIR
Addendum
GHD will prepare an Addendum to
the certified 2040 General Plan PEIR
to document an analysis of impacts
associated with implementation of the
DBRP. The PEIR Addendum will be
completed in accordance with the CEQA
Guidelines. This will include: 1) Brief
explanation of the decision not to prepare
a subsequent EIR pursuant to Section
15162; 2) Revised Background and Project
Description prepared under Task No. 6.1; 3)
Completion of an environmental checklist
evaluating the DBRP relative to the
environmental topics in the 2040 General
Plan PEIR and subsequent Addenda; and 4)
Inclusion of applicable mitigation measures.

An Administrative Draft document will
be prepared and submitted to the City
for review. After the review, GHD will
update the Addendum, incorporating City
comments, and will provide a Screencheck
Draft to the City for review.

Deliverables: Administrative Draft PEIR
Addendum; Screencheck PEIR Addendum;
Final PEIR Addendum
Assumptions and Exclusions:
- This task includes time for three (3)
document review meetings between City
staff and GHD.
- This scope of services assumes that
no new or revised background reports
or technical studies are required to
complete the analysis
Subtask 6.3: CEQA Coordination
and Public Hearing
GHD will assist the City with the CEQA
aspects of the City's resolution and staff
report, attendance at public hearing where
the PEIR Addendum is approved, filing of
final CEQA documentation with the State
Clearinghouse if the City desires.

Deliverables:
- Review and input on CEQA Resolution
and Staff Report
- Draft and Final Notice of Determination
Assumptions and Exclusions:
- GHD assumes the City will pay any
CEQA filing fees and will post the
Notice of Determination (NOD) with the
County Clerk
- The City is the CEQA lead agency
and is responsible for making the
final determinations regarding
CEQA compliance.
- The City will provide necessary
background documents in a
timely manner
- Any legal review of CEQA documentation
or the Resolution will be conducted by
the City or its legal counsel
- Preparation of new CEQA documents
(aside from the PEIR Addendum)
are excluded.
- Facilitating or organizing the
public hearing itself (e.g., logistics,
presentations, community outreach) is
not included
- Preparation or peer review of technical
studies (traffic, air quality, biological,
etc.) is not included
- Provision of translated CEQA documents
or public materials is excluded.

Page 1367 of 18 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
69 E
o
t.)
t
to
t

x
Pr op osal for the City of Beaumont
0)
s
4-•
ti
li •-
0 a `�
N
4a
L
O •�

0. Ce IX
lia
i�A �
O
Co E
a�
0 (T
a a)
I_ co
OS
•- 3
E o
a)
3 a o
fi 0
4 The Power of C ommitment
Cost Prop osal I May 13, 2025

320 Goddard Avenue
Suite 200
Irvine, CA 92618
949.648.5200
www.ghd.com
Cost Proposal Letter
May 13, 2025
Raveena Chara I Procurement & Contracts Specialist I City of Beaumont 1550 E. 6th Street I Beaumont, CA 92223 I rchara@ beaumontca.gov
Re: Cost Proposal for Preliminary Design Report (PDR) for the Downtown Beaumont Revitalization Dear Ms. Chara and RFP Review Panelists:

Enclosed for your consideration is GHD Inc.'s (GHD) cost proposal for the Preliminary Design Report (PDR) for the Dowtown Beaumont Revitalization Poject. We are very excited about this project and look forward to working with the City of Beaumont (City) on this important endeavor.

GHD's fee proposal includes a breakdown of work tasks, personnel hours, personnel rates, and fees associated with our scope of services and approach to accomplish the City's goals.

We thanks you for your consideration of this project.

Regards,
Todd Tregenza, AICP
Principal in Charge/Mobility & Places Group Leader
Steven Latino, PE, TE
Project Manager/Client Relations Lead

Page 1370 of 189 ends

PDR for Downtown Beaumont Revitalization Plan
City of Beaumont
2 Preliminary Design Report (PER) for the Downtown Beaumont Revitalization Projec
Deeelor
Task1 Project Management
Subtask 1.1 Quality Management
Subtask 1.2 Project Management and Administration
Subtask 1.3 Stakeholder Engagement Plan and Stakeholder Database Taak2 Data Gathering and Analysis
Subtask 21 Existing Data Collection
Subtask 2.2 Field Investigations
Subtask 23 Environmental Review
Task3 Investigations
Subtask 3.1 Survey and Centerline Control
Subtask 3.2 Right -of -Way Analysis
Subtask 3 3 Utility Research
Subtask 3.4 Geotechnical Investigation
Subtask 3 5 Hydrological/Drainage Analysis
Subtask 3.6 Traffic Studies and Assessments
Subtask 3 7 Street and Pedestrian Lighting Analysis
Subtask 3.8 Tree Impact Analysis
Task4 Design Options
Subtask 4,1 Design Options for Roadway Improvements (Conceptual Design) Subtask 4.2 Lighting Design Options
Subtask 4.3 Design Options for Streetscape Amenities and Enhancements(Con +• al Design Task5 Preliminary Design Report (PDR)
Subtask 5.1 Preliminary Design Report
Subtask az Preliminary D ❑ (30% Plans)
Subtask 5.3 Preliminary Design Specl 'Cons
Subtask a4 Preliminary Construction Cost Estimates
Task6 Optional Environmental Services
Subtask 61 Optional Environmental S Background and PD
Subtask 6.2 Prepare PEIR Addendum
Subtask 6.3 CEQA Coordination and Public Hearing
Task7
Subtask 7.1 Salary Increases (July 1, 2026)
Prcoed
Manager
Steven
Latina
Ass an
Project
Manager
Erin
McPherso
76 208
6 28
4 20
2 12
Technical
Advises/QA/QC
Lindsey Van
Par
Rcundabou
Design
Ron Boyle
Environmental
Nicole
Greenberg
Engineer
GHD Sta
80 0 200
0 0 0
0 0 0
401 000
6 0 20
20 8 240
8 0 80
4 0 160
0 98 1 0
0 24 0
0 4034
0 OI 0 NM 0
0 0 0
Landscape
Architecture Lead
Lucas Pipe.

OHS Sta
244
20 120
24 B0
Lan cope
Architecture &
Alboriet
OHO Ste
Landscape
Support
OHO Sta
O o C
O 86 C
40 160 0 240 0 a
O o 0 0 0 0 0 0 r0 Ali
o o 0 0 0 0 0 0 0 0
40 160 0 240 0' 0 0 0 0 0
32 140 40 200 0' lir 0 I' 0 0 0
a o 0 0 of 0 0 0 0 0
24 80 40 160 0 0 0 0 0 0
4 4D 0 20l '0 0 0 0 0 0
4 20 S 2011 0 0 0 0 0 0
0 0 0 0. 5 44 11 6 l 7
0 0 0 0 1 10 2 2 6
0 0 0 0 0 4 26 8 4 6
0 0 0 0 0 0 8 1 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0
Landscape
Drafter
OHO Sta
Er.

Fenaelau
Transpcnation
br Env Supped
GHD Ste
En
S5005
OHO Ste
QAIQC
GIS (Env)
GHD
Ste
Air Quality I
GHG (Env)
GHD Sta
Public
Outreach SME
e Bel
Public
Outreac
20 124
0 0
0 0
20 24
Travel Demand
Madeline
OHO Ste
Miorosimulation
GHD S
Traffic
Operations
GHD Sta
Transportation
Engineer
GHD Ste
Urban Design/Public
Outreach
Jonathan Linkus
a
Proect
cocrdktato
GHD Staff
48 694
O 24
48 466
O 204
O 138
O 30
O 50
O 58
0 1382
O 8
O 52
0 32
O 8
O 80
0 1096
0 20
O 86
6 968
O 508
O 20
O 440
O 1592
168
832
240
352
O 171
40 11 88 $16,084
1 43 $8.712
O 0 $0
So
0 0
0 0 • 9i
O 0
O 0
0 0
0 III
01 $186,639
$7,897
$122,657
$56.085
$23.208
$6,048
$8,185
$8,975
$231,449
$2,084
$8,987
95,264
$2,084
$20,952
$169,797
$6,335
$15,945
$180,748
$108,105
$6,335
$66,308
$314,606
$45,286
$152,784
$50,451
$66,085
$32,372
$7,576
$011 $0
$0 $0
$0 $0
$0 $0
$o II $0I
$0 $0
$011 $15,521
$0 $0
$0 $15,521
$0 $0
$0 I $14,828
$0 $0
$0 $0 $0 $14,828
$0 $0 $0 $0
$116,600 I $48,169 I $27,405 I $26,730
$105,600 $0 $0 $0
$0 $0 $0 $0
$11,000 $48,169 $0 $0
$0 $0 $27,405 $0
$0 $0 $0 $0
$0 $0 $0 $0
$0 $0 $0 $26,730
$0 $0 $0 $0
$0 I $87,992
$0 $0
$0 $57,992
$0 $0
$0 II $184,718
$0 $0
$0 $149,716
$0 $15,004
$0 $19,998
$0 Ilallle,$a
$0 $0
$0 $0
$0 $0
80 "Ili $0
$0 $0
00 $0
$0 $0
$ol30 I
$0 $0
$0 $0
$0 $0
$0 $0
$011ML $0 I
$0 $0
$0 $0
$0 $0
$011 $0 I
$0 90
Total
Subcontractors
$15,521
$0
915.521
S0
$14,828
So
$14.828
50 $218,904
$105,600
$0
$59,169
$27,405
$0
$0
$26,730
$0
557.992
$o
$57,992
$0
$184,718
$0
$149,716
$15,004
$19,998
$0
$0
$0
So
$0
S0
$6,025
S0
82 000
$4,025
81,250
90 $1.250
50 $5,610
SO
90 $0
$0
$0
$4,950
$0
$660
$0
$0
90 $0
$0
$0
$0
$0
$0
$0
$0
$0
90 $9,765
59,765
$208,185
$7897
9140 178
$60,110
$39,286
$6,048
$24.263
$8,975
$455,963
$107.684
$8,987
$64,433
$29,490
$20,952
$174,747
$33,065
$16,605
$238,740
$108,105
$64,327
$66,308
$499,324
945.286
$302,500
$65,455
$86,083
$32,372
$7,576
$16,084
$8,712
$9,765
$9,765

Page 1371 of 1893 ends

E
o
t.)
t
to
t

City of Beaumont Agreement #
C25-120
EXHIBIT "C"

CERTIFICATES OF INSURANCE AND ENDORSEMENTS
(insert behind this page)

Page 1373 of 1893 ends
Page 1 of 2 ends

Q:.'

ACRD CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)
08/27/2025
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS

CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.

If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).

PRODUCER
Willis Towers Watson Northeast, Inc.
c/o 26 Century Blvd
P.O. Box 305191
Nashville, TN 372305191 USA
CONTACT WTW Certificate Center
NAME:
(A/CNNo. Ext): 1-877-945-7378 (A/C No): 1-888-467-2378
E-MAIL [email protected]
ADDRESS:

INSURER(S) AFFORDING COVERAGE
NAIC#
INSURERA: Allied World Assurance Company US Inc
19489

INSURED
GHD Inc.
3200 E Camelback Ed Suite 210
Phoenix, AZ 85018
INSURERS: Zurich American Insurance Company
16535
INSURER C: Beazley Insurance Company Inc
37540
INSURERD:

INSURER E :

INSURER F :

COVERAGES
CERTIFICATE NUMBER: W40122515
REVISION NUMBER:

THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS

CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.

ILTR

TYPE OF INSURANCE
INSD
SUBR
WVD

POLICY NUMBER

POLICY EFF
(MM/DDIYYYY)

POLICY EXP
(MM/DD/YYYY)
LIMITS
A
X

COMMERCIAL GENERAL LIABILITY
Y
Y
0310-4497
12/01/2024
12/01/2025

EACH OCCURRENCE
$ 1,000,000

CLAIMS -MADE L OCCUR
DAMAGE MI ESOSES (Ea occurrence)

PREMISES
$ 1,000,000
MED EXP (Any one person)
$ 50,000

PERSONAL&ADVINJURY
$ 1,000,000
GEN'L

AGGREGATE
X

LIMIT APPLIES

JECT PRO
PER:

LOC

GENERAL AGGREGATE
$ 2,000,000

PRODUCTS - COMP/OPAGG
$ 2,000,000
$
B

AUTOMOBILE
X
X
X

LIABILITY

ANY AUTO
OWNED

AUTOS ONLY
x
X

SCHEDULED
AUTOS
a NON -OWNED �I
ceUmpOuea:LS250
Y
Y
BAP 3757423-10
07/01/2025
07/01/2026

COMBINED SINGLE LIMIT
(Ea accident)
$ 2,000,000
BODILY INJURY (Per person)
$
BODILY INJURY (Per accident)
$

PROPERTY DAMAGE
(Per accident)
$
Hired Physical Damag4$
100,000.00

UMBRELLA LIAB

EXCESS LIAB
OCCUR

CLAIMS -MADE

EACH OCCURRENCE
$

AGGREGATE
DED
RETENTION $
$
B

WORKERS COMPENSATION

AND EMPLOYERS' LIABILITY

ANYPROPRIETOR/PARTNER/EXECUTIVE
OFFICER/MEMBEREXCLUDED?
(Mandatory in NH)
If yes, describe under
DESCRIPTION OF OPERATIONS below
Y / N
No
N/A
Y
WC 0380936-10
07/01/2025
07/01/2026
X
PER

STATUTE
OTH-
ER
E.L. EACH ACCIDENT
$ 1,000,000
E.L. DISEASE - EA EMPLOYEE
$ 1,000,000
E.L. DISEASE - POLICY LIMIT
$ 1,000,000
C
Professional Liability
Y
V29594240601
12/01/2024
12/01/2025
Each Claim:

Aggregate:
$2,000,000
$2,000,000
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) GHD Project no.: 12668609, Downtown revitalization preliminary design project City of Beaumont, its elected and appointed officers, employees, agents and volunteers are included as Additional Insureds as respects to General Liability, and Auto Liability where required by contract or agreement.

Waiver of Subrogation applies in favor of Additional Insureds with respects to General Liability, Auto Liability, and

CERTIFICATE HOLDER

CANCELLATION

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE

THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS.

AUTHORIZED REPRESENTATIVE
City of Beaumont
550 E. Sixth St
Beaumont, CA 92223
ACORD 25 (2016/03)
© 1988-2016 ACORD CORPORATION. All rights reserved.

The ACORD nam bbd 11.rediSittMmarks of ACORD
SR ID: 28311135 BATCH: 4101296

AGENCY CUSTOMER ID:

LOC #:

ACORO�

ADDITIONAL REMARKS SCHEDULE

Page 2 of 2 ends

AGENCY
Willis Towers Watson Northeast, Inc.

NAMED INSURED
GHD Inc.
3200 E Camelback Rd Suite 210
Phoenix, AZ 85018

POLICY NUMBER
See Page 1

CARRIER
See Page 1

NAIL CODE
See Page 1
EFFECTIVE DATE: See Page 1

ADDITIONAL REMARKS

THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance Professional Liability where required by contract or agreement and Workers Compensation where required by written contract, agreement or permit where permissible by law or statute.

ACORD 101 (2008/01)
© 2008 ACORD CORPORATION. All rights reserved.

The ACORD name pEwscriwEDgjftEllrgcNarks of ACORD
SR ID: 28311135 BATCH: 4101296 CERT: W40122515

Policy Term: December 1, 2024 - December 1, 2025
POLICY NUMBER: 0310-4497

COMMERCIAL GENERAL LIABILITY
CG 20 10 10 01
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

ADDITIONAL INSURED - OWNERS, LESSEES OR

CONTRACTORS - SCHEDULED PERSON OR

ORGANIZATION
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART

SCHEDULE
Name of Person or Organization:

Where required by written contract
(If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.)
A. Section II — Who Is An Insured is amended to
include as an insured the person or organization
shown in the Schedule, but only with respect to
liability arising out of your ongoing operations per-
formed for that insured.

B. With respect to the insurance afforded to these
additional insureds, the following exclusion is
added:

2. Exclusions
This insurance does not apply to "bodily inju-
ry" or "property damage" occurring after:
(1) All work, including materials, parts or
equipment furnished in connection with
such work, on the project (other than
service, maintenance or repairs) to be
performed by or on behalf of the addi-
tional insured(s) at the site of the cov-
ered operations has been completed;
or
(2) That portion of "your work" out of which
the injury or damage arises has been
put to its intended use by any person or
organization other than another con-
tractor or subcontractor engaged in
performing operations for a principal as
a part of the same project.

CG 20 10 10 01
© esag$op$rReesDinr89D00

Page 1 of 1 ends

Policy Term: December 1, 2024 - December 1, 2025
POLICY NUMBER: 0310-4497 COMMERCIAL GENERAL LIABILITY
CG 20 37 10 01
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

ADDITIONAL INSURED - OWNERS, LESSEES OR

CONTRACTORS - COMPLETED OPERATIONS
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART

SCHEDULE
Name of Person or Organization:

Where required by written contract
Location And Description of Completed Operations:

Where required by written contract
Additional Premium:

N/A
(If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.)
Section II — Who Is An Insured is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work" at the location designated and described in the schedule of this endorsement performed for that insured and included in the "products -completed operations haz- ard".

CG 20 37 10 01
© II3Q (1)8rRi�spfrt$9100 Page 1 of 1 O

POLICY NUMBER: 0310-4497 COMMERCIAL GENERAL LIABILITY
CG 24 04 05 09

WAIVER OF TRANSFER OF RIGHTS OF RECOVERY

AGAINST OTHERS TO US
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART

PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART

SCHEDULE
Name Of Person Or Organization:

Where required by written contract
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.

The following is added to Paragraph 8. Transfer Of
Rights Of Recovery Against Others To Us of
Section IV — Conditions:

We waive any right of recovery we may have against
the person or organization shown in the Schedule
above because of payments we make for injury or
damage arising out of your ongoing operations or
"your work" done under a contract with that person
or organization and included in the "products -
completed operations hazard". This waiver applies
only to the person or organization shown in the
Schedule above.

CG 24 04 05 09
© InsurdlaTA8ef afffth9@c., 2008 Page 1 of 1 O

Policy Term: December 1, 2024 - December 1, 2025
POLICY NUMBER: 0310-4497 COMMERCIAL GENERAL LIABILITY
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

ADDITIONAL NOTICE OF CANCELLATION
(AMENDMENT OF CANCELLATION CONDITION)
This endorsement modifies insurance provided under the following:

COMMERCIAL GENERAL LIABILITY COVERAGE PART
Section IV — Commercial General Liability Conditions is amended to include the following additional condition:

In the event that we cancel this policy for any reason, other than for the nonpayment of premium, we will provide advance written notice of such cancellation to the entity(ies) or individual(s) shown in the Schedule below in accordance with the number of days stated.

SCHEDULE
Entity or Individual
Address
Number of Days Advance
Written Notice of Cancellation
(Other Than Nonpayment of
Premium)
Where required by written
contract
Where required by written
contract
30 Days
GL 00068 00 (03/11)

Page 1379 of 1893 ends

Coverage Extension Endorsement
ZURICH
Policy No.

Eff. Date of Pol.

Exp. Date of Pol.

Eff. Date of End.

Producer No.

Add'I. Prem
Return Prem.

BAP 3757423-10
07/01/2025
07/01/2026
07/01/2025
---
---
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

This endorsement modifies insurance provided under the:

Business Auto Coverage Form
Motor Carrier Coverage Form
A. Amended Who Is An Insured

1. The following is added to the Who Is An Insured Provision in Section II — Covered Autos Liability Coverage:

The following are also "insureds":
a. Any "employee" of yours is an "insured" while using a covered "auto" you don't own, hire or borrow for acts performed within the scope of employment by you. Any "employee" of yours is also an "insured" while operating an "auto" hired or rented under a contract or agreement in an "employee's" name, with your permission, while performing duties related to the conduct of your business. b. Anyone volunteering services to you is an "insured" while using a covered "auto" you don't own, hire or borrow to transport your clients or other persons in activities necessary to your business. c. Anyone else who furnishes an "auto" referenced in Paragraphs A.1.a. and A.1.b. in this endorsement. d. Where and to the extent permitted by law, any person(s) or organization(s) where required by written contract or written agreement with you executed prior to any "accident", including those person(s) or organization(s) directing your work pursuant to such written contract or written agreement with you, provided the "accident" arises out of operations governed by such contract or agreement and only up to the limits required in the written contract or written agreement, or the Limits of Insurance shown in the Declarations, whichever is less.

2. The following is added to the Other Insurance Condition in the Business Auto Coverage Form and the Other Insurance — Primary and Excess Insurance Provisions Condition in the Motor Carrier Coverage Form:

Coverage for any person(s) or organization(s), where required by written contract or written agreement with you executed prior to any "accident", will apply on a primary and non-contributory basis and any insurance maintained by the additional "insured" will apply on an excess basis. However, in no event will this coverage extend beyond the terms and conditions of the Coverage Form.

All other terms, conditions, provisions and exclusions of this policy remain the same.

Page 1380 of 1893 ends

Includes copyrighted material of Insurance Services Office, Inc., with its permission.

U -CA -424-F CW (04/14)

Page 1 of 1 ends

1. Breakdown;

2. Repair;

3. Servicing;

4. "Loss"; or

5. Destruction.

2. The following is added to the Paragraph A. Coverage Provision of the Physical Damage Coverage Section:

Temporary Substitute Autos — Physical Damage
We will pay the owner for "loss" to the temporary substitute "auto" unless the "loss" results from fraudulent acts or omissions on your part. If we make any payment to the owner, we will obtain the owner's rights against any other party.

The deductible for the temporary substitute "auto" will be the same as the deductible for the covered "auto" it replaces.

M. Amended Duties In The Event Of Accident, Claim, Suit Or Loss Paragraph a. of the Duties In The Event Of Accident, Claim, Suit Or Loss Condition is replaced by the following:
a. In the event of "accident", claim, "suit" or "loss", you must give us or our authorized representative prompt notice of the "accident", claim, "suit" or "loss". However, these duties only apply when the "accident", claim, "suit" or "loss" is known to you (if you are an individual), a partner (if you are a partnership), a member (if you are a limited liability company) or an executive officer or insurance manager (if you are a corporation). The failure of any agent, servant or employee of the "insured" to notify us of any "accident", claim, "suit" or "loss" shall not invalidate the insurance afforded by this policy.

Include, as soon as practicable:
(1) How, when and where the "accident" or "loss" occurred and if a claim is made or "suit" is brought, written notice of the claim or "suit" including, but not limited to, the date and details of such claim or "suit"; (2) The "insured's" name and address; and
(3) To the extent possible, the names and addresses of any injured persons and witnesses.

If you report an "accident", claim, "suit" or "loss" to another insurer when you should have reported to us, your failure to report to us will not be seen as a violation of these amended duties provided you give us notice as soon as practicable after the fact of the delay becomes known to you.

N. Waiver of Transfer Of Rights Of Recovery Against Others To Us The following is added to the Transfer Of Rights Of Recovery Against Others To Us Condition:

This Condition does not apply to the extent required of you by a written contract, executed prior to any "accident" or "loss", provided that the "accident" or "loss" arises out of operations contemplated by such contract. This waiver only applies to the person or organization designated in the contract.

O. Employee Hired Autos — Physical Damage
Paragraph b. of the Other Insurance Condition in the Business Auto Coverage Form and Paragraph f. of the Other Insurance — Primary and Excess Insurance Provisions Condition in the Motor Carrier Coverage Form are replaced by the following:

For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own:
(1) Any covered "auto" you lease, hire, rent or borrow; and (2) Any covered "auto" hired or rented under a written contract or written agreement entered into by an "employee" or elected or appointed official with your permission while being operated within the course and scope of that "employee's" employment by you or that elected or appointed official's duties as respect their obligations to you.

However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto".

Includes copyrighted materRaC,]. aula32ls®fic18 ce, Inc., with its permission.

U -CA -424-H NY (10/21)

Page 4 of 6 ends

Blanket Notification to Others of Cancellation
or Non -Renewal
Policy No.

Eff. Date of Pol.

Exp. Date of Pol.

Eff. Date of End.

Producer No.

Add'I. Prem
Return Prem.

BAP 3757423-10
07/01/2025
07/01/2026
07/01/2025
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.

This endorsement modifies insurance provided under the:

Commercial Automobile Coverage Part
A. If we cancel or non -renew this Coverage Part by written notice to the first Named Insured, we will mail or deliver notification that such Coverage Part has been cancelled or non -renewed to each person or organization shown in a list provided to us by the first Named Insured if you are required by written contact or written agreement to provide such notification. However, such notification will not be mailed or delivered if a conditional notice of renewal has been sent to the first Named Insured. Such list:

1. Must be provided to us prior to cancellation or non -renewal;

2. Must contain the names and addresses of only the persons or organizations requiring notification that such Coverage Part has been cancelled or non -renewed; and

3. Must be in an electronic format that is acceptable to us.

B. Our notification as described in Paragraph A. of this endorsement will be based on the most recent list in our records as of the date the notice of cancellation or non -renewal is mailed or delivered to the first Named Insured. We will mail or deliver such notification to each person or organization shown in the list:

1. Within seven days of the effective date of the notice of cancellation, if we cancel for non-payment of premium; or

2. At least 30 days prior to the effective date of:
a. Cancellation, if cancelled for any reason other than nonpayment of premium; or b. Non -renewal, but not including conditional notice of renewal.

C. Our mailing or delivery of notification described in Paragraphs A. and B. of this endorsement is intended as a courtesy only. Our failure to provide such mailing or delivery will not:

1. Extend the Coverage Part cancellation or non -renewal date;

2. Negate the cancellation or non -renewal; or

3. Provide any additional insurance that would not have been provided in the absence of this endorsement.

D. We are not responsible for the accuracy, integrity, timeliness and validity of information contained in the list provided to us as described in Paragraphs A. and B. of this endorsement.

All other terms and conditions of this policy remain unchanged.

U -CA -832-A CW (01/13)

Page 1 of 1 ends

Includes copyrighted majel- Ir1Rgr8gE ery$ 8Jffice, Inc., with its permission.

Policy #WC 0380936-10
WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed. 4-84)

WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT
We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule.

Schedule

ALL PERSONS AND/OR ORGANIZATIONS THAT ARE REQUIRED BY WRITTEN

CONTRACT OR AGREEMENT WITH THE INSURED, EXECUTED PRIOR TO THE

ACCIDENT OR LOSS, THAT WAIVER OF SUBROGATION BE PROVIDED UNDER THIS POLICY FOR WORK PERFORMED BY YOU FOR THAT PERSON AND/OR ORGANIZATION.

WC 00 03 13
(Ed. 4-84)
© 1983 National Council on Compensation Insurance.

Page 1383 of 1893 ends

WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 99 06 43

BLANKET NOTIFICATION TO OTHERS OF CANCELLATION OR NONRENEWAL ENDORSEMENT This endorsement adds the following to Part Six of the policy.

PART SIX

CONDITIONS
Blanket Notification to Others of Cancellation or Nonrenewal

1. If we cancel or non -renew this policy by written notice to you, we will mail or deliver notification that such policy has been cancelled or non -renewed to each person or organization shown in a list provided to us by you if you are required by written contract or written agreement to provide such notification. However, such notification will not be mailed or delivered if a conditional notice of renewal has been sent to you. Such list:
a. Must be provided to us prior to cancellation or non -renewal; b. Must contain the names and addresses of only the persons or organizations requiring notification that such policy has been cancelled or non -renewed; and
c. Must be in an electronic format that is acceptable to us.

2. Our notification as described in Paragraph 1. above will be based on the most recent list in our records as of the date the notice of cancellation or non -renewal is mailed or delivered to you. We will mail or deliver such notification to each person or organization shown in the list:
a. Within seven days of the effective date of the notice of cancellation, if we cancel for non-payment of premium; or
b. At least 30 days prior to the effective date of:
(1) Cancellation, if cancelled for any reason other than nonpayment of premium; or (2) Non -renewal, but not including conditional notice of renewal.

3. Our mailing or delivery of notification described in Paragraphs 1. and 2. above is intended as a courtesy only.

Our failure to provide such mailing or delivery will not:
a. Extend the policy cancellation or non -renewal date; b. Negate the cancellation or non -renewal; or
c. Provide any additional insurance that would not have been provided in the absence of this endorsement.

4. We are not responsible for the accuracy, integrity, timeliness and validity of information contained in the list provided to us as described in Paragraphs 1. and 2. above.

All other terms and conditions of this policy remain unchanged.

This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 07/01/2025
Insured GHD Holdings US LLC
Policy No. WC 0380936-10
Insurance Company Zurich American Insurance Company
Endorsement No.

Premium $
WC 99 06 43
(Ed. 01-13) Includes copyright material of the National Council on Compensation Insurance, Inc. used with its permission. © 2012 Copyright National Pag of ne> iKaurance, Inc. All Rights Reserved.

Page 1 of 1 ends

NOTICE: THESE POLICY FORMS AND THE APPLICABLE RATES ARE EXEMPT

FROM THE FILING REQUIREMENTS OF THE NEW YORK INSURANCE LAW AND REGULATIONS. HOWEVER, THE FORMS AND RATES MUST MEET THE MINIMUM STANDARDS OF THE NEW YORK INSURANCE LAW AND REGULATIONS.

Effective date of this Endorsement: 01 -Dec -2024
This Endorsement is attached to and forms a part of Policy Number: V29594240601 Beazley Insurance Company, Inc. Referred to in this endorsement as either the "Insurer" or the "Underwriters"

NOTICE OF CANCELLATION TO CERTIFICATE HOLDER
This endorsement modifies insurance provided under the following:

AFB A&E MEDIA TECH® POLICY
In consideration of the premium charged for the Policy, it is hereby understood and agreed that in addition to the provisions of Clause XVI. CANCELLATION AND NONRENEWAL B., if this policy is cancelled by the Underwriters, other than for non-payment of premium, the Underwriters will provide 90 days written notice to the following party(ies):

All certificate holders that require such advance notice by written contract per list provided to the Underwriters by the Insured.

All other terms and conditions of this Policy remain unchanged.

Au orized Representative--
E01414 Page 1 of 1
082009 ed.

Class Code: 2-14013

Page 1385 of 1893 ends

NTMO
BEAU

C A L I F O R N A
California Levine Act Statement
California Government Code Section 84308, commonly referred to as the "Levine Act," prohibits any Beaumont City Council Member from participating in any action related to a contract or application if he or she receives any political contributions totaling more than $500 within the previous twelve months, and for twelve months following the date a final decision from the business/board or applicant.

The Levine Act also requires a member of the Beaumont City Council who has received such a contribution to disclose the contribution on the record of the proceeding.

Current Beaumont City Council Members are listed at:
https://www.beaumontca.gov/29/City-Council
Proposers are responsible for accessing this link to review the names prior to answering the following questions.

1. Have you or your company, or any agent/board member on behalf of you or your company/entity, made any political contributions of more than $500 to any Beaumont City Council Member in the 12 months preceding the date of the submission of your proposal or application, or the anticipated date of any Council action? YES If yes, please identify the Council Member(s):

X NO

2. Do you or your company/entity, or any agency on behalf of you or your company/entity, anticipate or plan to make any political contribution of more than $500 to any Beaumont City Council Member in the 12 months following any Council action related to your proposal or application?
YES If yes, please identify the Council Member(s):
x NO
Answering yes to either of the two questions above does not preclude the Beaumont City Council from awarding a contract or approving an application or any subsequent action. It does however, preclude the identified Council Member(s) from participating in any actions related to your proposal or application.
8/28/2025
Date
Signatu off authorized individual
Todd Tregenza, GHD
Company/Applicant Name
City of Beaumont 1550 E. 6th Street, Beaumont, CA 92223 I (951) 769-8520 I BeaumontCA.gov

Page 1386 of 1893 ends