AGREEMENT NO. 502.16
PROFESSIONAL SERVICES AGREEMENT
BETWEEN
THE CITY OF BELLFLOWER AND
ONWARD ENGINEERING
FOR ON-CALL CONSTRUCTION MANAGEMENT AND CONSTRUCTION
INSPECTION SERVICES
THIS AGREEMENT is entered into this 14th day of October 2024, by and between the CITY OF BELLFLOWER, a municipal corporation and general law city (“CITY”) and ONWARD ENGINEERING, a California corporation (“CONSULTANT”).
1. CONSIDERATION.
A.As partial consideration, CONSULTANT agrees to perform the work listed in the SCOPE OF SERVICES, below;
B.As additional consideration, CONSULTANT and CITY agree to abide by the terms and conditions contained in this Agreement;
C. As additional consideration, CITY agrees to pay CONSULTANT a sum not to exceed sum(s) as set forth in duly executed Task Order(s) for CONSULTANT’s services. CITY will pay this sum(s) on the basis of the hourly rates and cost reimbursement rates as specified in the attached Exhibit “B,” which is incorporated herein.
2. SCOPE OF SERVICES.
A.CONSULTANT will perform construction management and construction inspection services listed in the attached Exhibit “A” which is incorporated by reference.
B.The specific services required of CONSULTANT under this Agreement will consist of the tasks and obligations defined in a Task Order approved by CITY and CONSULTANT, in response to specific project scopes of work and services requested by CITY. Any duly executed and approved Task Order will become a part of this Agreement. The standard form for the Task Order is set forth in Exhibit C.
C. Consulting services required by CITY will be provided on an as-needed basis with CITY determining and advising CONSULTANT as to when specific services are required to be performed or completed by CONSULTANT.
-105-
City of Bellflower
Agreement No. 502.16
Onward Engineering
D. CONSULTANT will, in a professional manner, furnish all of the labor, technical, administrative, professional and other personnel, all supplies and materials, equipment, printing, vehicles, transportation, office space and facilities, and all tests, testing and analyses, calculation, and all other means whatsoever, except as herein otherwise expressly specified to be furnished by CITY, necessary or proper to perform and complete the work and provide the professional services required of CONSULTANT by this Agreement.
E.CONSULTANT’s duties and services under this agreement may not include preparing or assisting CITY with any portion of CITY’s preparation of a request for proposals, request for qualifications, or any other solicitation regarding a subsequent or additional contract with CITY. CITY retains responsibility for public contracting, including with respect to any subsequent phase of a project. CONSULTANT's participation in the planning, discussions, or drawing of project plans or specifications are limited to conceptual, preliminary, or initial plans or specifications.
CONSULTANT must cooperate with CITY to ensure that all bidders for a subsequent contract on any subsequent phase of this project have access to the same information, including all conceptual, preliminary, or initial plans or specifications prepared by contractor pursuant to this agreement.
3. PERFORMANCE STANDARDS. While performing this Agreement, CONSULTANT will use the appropriate generally accepted professional standards of practice existing at the time of performance utilized by persons engaged in providing similar services. CITY will continuously monitor CONSULTANT’s services. CITY will notify CONSULTANT of any deficiencies and CONSULTANT will have fifteen (15) days after such notification to cure any shortcomings to CITY’s satisfaction. Costs associated with curing the deficiencies will be borne by CONSULTANT.
4. PREVAILING WAGES.
A.Pursuant to Labor Code § 1720, and as specified in 8 California Code of Regulations § 16000, CONSULTANT must pay its workers prevailing wages. It is CONSULTANT’s responsibility to interpret and implement any prevailing wage requirements and CONSULTANT agrees to pay any penalty or civil damages resulting from a violation of the prevailing wage laws.
B.In accordance with Labor Code § 1773.2, copies of the prevailing rate of per diem wages are available upon request from CITY’s Engineering Division or the website for State of California Prevailing wage determination at http://www.dir.ca.gov/DLSR/PWD . CONSULTANT must post a copy of the prevailing rate of per diem wages at the job site.
-106-
City of Bellflower
Agreement No. 502.16
Onward Engineering
C. CITY directs CONSULTANT’s attention to Labor Code §§ 1777.5, 1777.6 and 3098 concerning the employment of apprentices by CONSULTANT or any subcontractor.
D. Labor Code § 1777.5 requires CONSULTANT or subcontractor employing tradesmen in any apprenticeship occupation to apply to the joint apprenticeship committee nearest the site of the public works project and which administers the apprenticeship program in that trade for a certificate of approval. The certificate must also fix the ratio of apprentices to journeymen that will be used in the performance of the contract. The ratio of apprentices to journeymen in such cases will not be less than one to five except:
i.When employment in the area of coverage by the joint
apprenticeship committee has exceeded an average of 15 percent in the 90 days before the request for certificate, or
ii.When the number of apprentices in training in the area exceeds a ratio of one to five, or
iii.When the trade can show that it is replacing at least 1/30 of its membership through apprenticeship training on an annual basis state wide or locally, or
iv. When CONSULTANT provides evidence that CONSULTANT
employs registered apprentices on all of his contracts on an annual average of not less than one apprentice to eight journeymen. v.CONSULTANT is required to make contributions to funds established for the administration of apprenticeship programs if CONSULTANT employs registered apprentices or journeymen in any apprenticeable trade on such contracts and if other contractors on the public works site are making such contributions. vi. CONSULTANT and any subcontractor must comply with Labor Code §§ 1777.5 and 1777.6 in the employment of apprentices.
vii. Information relative to apprenticeship standards, wage schedules and other requirements may be obtained from the Director of Industrial Relations, ex officio the Administrator of Apprenticeship, San Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
E.CONSULTANT and its subcontractors must keep an accurate certified -107-
City of Bellflower
Agreement No. 502.16
Onward Engineering
payroll records showing the name, occupation, and the actual per diem wages paid to each worker employed in connection with this Agreement.
The record will be kept open at all reasonable hours to the inspection of the body awarding the contract and to the Division of Labor Law Enforcement.
If requested by CITY, CONSULTANT must provide copies of the records at its cost.
5. PAYMENTS.
A.For CITY to pay CONSULTANT as specified by this Agreement and as set forth in each approved Task Order, CONSULTANT must submit a detailed invoice to CITY which lists the hours worked and hourly rates for each personnel category and reimbursable costs (all as set forth in Exhibit “B”), the tasks performed, the percentage of the task completed during the billing period, and the cumulative percentage completed for each task.
B.For services involving the preparation of plans and specifications, payment to CONSULTANT, as provided herein, will not exceed ninety percent (90%) of the total amount for the specific Task Order before completing the plans and specifications. The final 10% will be paid within 45 days after CITY accepts the plans and specifications, as determined by the City Manager.
C. Except as otherwise authorized by CITY’s City Council, the maximum not- to-exceed amount for any individual Task Order will be limited to $250,000.
D. CITY’s City Manager may make payments up to $25,000 for special items of work not included in the project scope of work and services as set forth in the Task Order. Payments for special work will only be made after CITY issues a written notice to proceed for the specific special tasks. A written scope of work, an agreed upon additional fee, a schedule for starting and completing the special tasks, and an agreed upon extension of the time for performance, if needed to complete the special work, will be required before CITY issues a notice to proceed for special work. All special work will be subject to all other terms and provisions of this Agreement.
E.CITY will not reimburse CONSULTANT for the following: staff time or overtime for performing secretarial, clerical, or word processing functions; charges for time spent to provide necessary information for CITY audits, billing or budget inquiries; and computer on line charges.
F.CITY will reimburse CONSULTANT for actual and necessary ordinary out-of-pocket expenses reasonably incurred by CONSULTANT in performance of the service provided by CONSULTANT. Such reimbursement will be at cost, i.e., without mark-up. Examples are as -108-
City of Bellflower
Agreement No. 502.16
Onward Engineering
follows: deposition fees; postage; messenger/process service; and document reproduction.
6. NON-APPROPRIATION OF FUNDS. Payments due and payable to CONSULTANT for current services are within the current budget and within an available, unexhausted and unencumbered appropriation of the CITY. In the event the CITY has not appropriated sufficient funds for payment of CONSULTANT services beyond the current fiscal year, this Agreement will cover only those costs incurred up to the conclusion of the current fiscal year.
7. ADDITIONAL WORK.
A.CITY’s Director of Public Works (“Director”) may determine, at the Director’s sole discretion, that CONSULTANT must perform additional work (“Additional Work”) to complete the Scope of Work. If Additional Work is needed, the Director will give written authorization to CONSULTANT to perform such Additional Work.
B.If CONSULTANT believes Additional Work is needed to complete the Scope of Work, CONSULTANT will provide the Director with written notification that contains a specific description of the proposed Additional Work, reasons for such Additional Work, and a detailed proposal regarding cost.
C. Payments over $25,000 for Additional Work above the $250,000 individual task order not-to-exceed amount must be approved by CITY’s city council.
All Additional Work will be subject to all other terms and provisions of this Agreement.
8. FAMILIARITY WITH WORK.
A.By executing this Agreement, CONSULTANT agrees that it has:
i.Carefully investigated and considered the scope of services to be performed;
ii.Carefully considered how the services should be performed; and iii.Understands the facilities, difficulties, and restrictions attending performance of the services under this Agreement.
B.If services involve work upon any site, CONSULTANT agrees that CONSULTANT has or will investigate the site and is or will be fully acquainted with the conditions there existing, before commencing the services hereunder. Should CONSULTANT discover any latent or unknown -109-
City of Bellflower
Agreement No. 502.16
Onward Engineering
conditions that may materially affect the performance of the services, CONSULTANT will immediately inform CITY of such fact and will not proceed except at CONSULTANT’s own risk until written instructions are received from CITY.
9. TERM. The term of this Agreement will be from October 14, 2024 to October 13, 2027. The Director, at CITY’s option, may extend the term twice for not more than a total of five years. Unless otherwise determined by written amendment between the parties, this Agreement will terminate at the end of the Term or as set forth in Section 17, except that the term will be extended to the completion date of any Task Order in effect at the end of the term of this Agreement.
10. TIME FOR PERFORMANCE.
A.CONSULTANT will not perform any work under this Agreement until:
i.CONSULTANT furnishes proof of insurance as required under Section 24 of this Agreement; and
ii.CITY gives CONSULTANT a written notice to proceed.
B.Should CONSULTANT begin work on any phase in advance of receiving written authorization to proceed, any such professional services are at CONSULTANT’s own risk.
11. TIME EXTENSIONS. Should CONSULTANT be delayed by causes beyond CONSULTANT’s control, CITY may grant a time extension for the completion of the contracted services. If delay occurs, CONSULTANT must notify the Director within forty- eight hours (48 hours), in writing, of the cause and the extent of the delay and how such delay interferes with the Agreement’s schedule. The Director will extend the completion time, when appropriate, for the completion of the contracted services.
12. CONSISTENCY. In interpreting this Agreement and resolving any ambiguities, the main body of this Agreement takes precedence over the attached Exhibits; this Agreement supersedes any conflicting provisions. Any inconsistency between the Exhibits will be resolved in the order in which the Exhibits appear below:
A.Exhibit A: Scope of Services;
B.Exhibit B: Fee Schedule;
C. Exhibit C: Standard Task Order Form; and
D. Exhibit D: Proposal of Services.
-110-
City of Bellflower
Agreement No. 502.16
Onward Engineering
13. CHANGES. CITY may order changes in the services within the general scope of this Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the contract time will be adjusted accordingly. All such changes must be authorized in writing, executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in the services will be determined in accordance with written agreement between the parties.
14. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a Taxpayer Identification Number.
15. PERMITS AND LICENSES. CONSULTANT, at its sole expense, will obtain and maintain during the term of this Agreement, all necessary permits, licenses, and certificates that may be required in connection with the performance of services under this Agreement.
16. WAIVER. CITY’s review or acceptance of, or payment for, work product prepared by CONSULTANT under this Agreement will not be construed to operate as a waiver of any rights CITY may have under this Agreement or of any cause of action arising from CONSULTANT’s performance. A waiver by CITY of any breach of any term, covenant, or condition contained in this Agreement will not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition contained in this Agreement, whether of the same or different character.
17. TERMINATION.
A.Except as otherwise provided, CITY may terminate this Agreement at any time with or without cause.
B.CONSULTANT may terminate this Agreement at any time with CITY’s mutual consent. Notice will be in writing at least thirty (30) days before the effective termination date.
C. Upon receiving a termination notice, CONSULTANT will immediately cease performance under this Agreement unless otherwise provided in the termination notice. Except as otherwise provided in the termination notice, any additional work performed by CONSULTANT after receiving a termination notice will be performed at CONSULTANT'’ own cost; CITY will not be obligated to compensate CONSULTANT for such work.
D. Should termination occur, all finished or unfinished documents, data, studies, surveys, drawings, maps, reports and other materials prepared by CONSULTANT will, at CITY’s option, become CITY’s property, and -111-
City of Bellflower
Agreement No. 502.16
Onward Engineering
CONSULTANT will receive just and equitable compensation for any work satisfactorily completed up to the effective date of notice of termination, not to exceed the total costs under Section 1(C).
E.Should the Agreement be terminated pursuant to this Section, CITY may procure on its own terms services similar to those terminated.
F.By executing this document, CONSULTANT waives any and all claims for damages that might otherwise arise from CITY’s termination under this Section.
18. OWNERSHIP OF DOCUMENTS; EXCEPTIONS; WARRANTY. Except as otherwise provided below, all documents, data, studies, drawings, maps, models, photographs and reports prepared by CONSULTANT (collectively, “Documents”) under this Agreement are CITY’s property. CONSULTANT may retain copies of such Documents as desired but will deliver all original materials to CITY upon CITY’s written notice. CITY agrees that use of CONSULTANT’s completed work product, for purposes other than identified in this Agreement, or use of incomplete work product, is at CITY’s own risk. CONSULTANT warrants that all Documents it drafts and completes pursuant to this Agreement constitutes original work. Specifically, CONSULTANT understands and agrees that use of artificial intelligence (AI) tools including, without limitation, ChatGPT, Microsoft’s Bing Chat, Google’s Bard, and Meta’s LLaMA (Large Language Model Meta AI), in the performance of this Agreement does not constitute an original work, i.e., submitting Documents generated by such AI tools to CITY and representing it as CONSULTANT’s original work constitutes a material breach of this Agreement, constitutes a false claim, and may also violate applicable intellectual property right laws including, without limitation, United States Copyright Law. Accordingly, and notwithstanding any other provision of this Agreement as to ownership, CITY specifically rejects ownership of such Documents. CONSULTANT is required to indemnify and defend CITY to the fullest extent allowed by applicable law should it violate this Section.
19. PUBLICATION OF DOCUMENTS. Except as necessary for performance of service under this Agreement, no copies, sketches, or graphs of materials, including graphic art work, prepared pursuant to this Agreement, will be released by CONSULTANT to any other person or public CITY without CITY’s prior written approval. All press releases, including graphic display information to be published in newspapers or magazines, will be approved and distributed solely by CITY, unless otherwise provided by written agreement between the parties.
20. INDEMNIFICATION.
A.CONSULTANT must save harmless, indemnify and defend CITY and all its officers, employees and representatives from and against any and all suits, actions, or claims, of any character whatever, brought for, or on account of, -112-
City of Bellflower
Agreement No. 502.16
Onward Engineering
any injuries or damages sustained by any person or property arising from, pertaining to, or relating to the negligence, recklessness, or willful misconduct of CONSULTANT or any of CONSULTANT’s officers, agents, employees, or representatives.
B.For purposes of this section “CITY” includes CITY’s officers, officials, employees, agents, representatives, and certified volunteers.
C. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
D. The requirements as to the types and limits of insurance coverage to be maintained by CONSULTANT as required by Section 24, and any approval of said insurance by CITY, are not intended to and will not in any manner limit or qualify the liabilities and obligations otherwise assumed by CONSULTANT pursuant to this Agreement, including, without limitation, to the provisions concerning indemnification.
21. ASSIGNABILITY. This Agreement is for CONSULTANT’s professional services.
CONSULTANT’s attempts to assign the benefits or burdens of this Agreement without CITY’s written approval are prohibited and will be null and void.
22. INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that CONSULTANT will act as an independent contractor and will have control of all work and the manner in which is it performed. CONSULTANT will be free to contract for similar service to be performed for other employers while under contract with CITY.
CONSULTANT is not an agent or employee of CITY and is not entitled to participate in any pension plan, insurance, bonus or similar benefits CITY provides for its employees.
Any provision in this Agreement that may appear to give CITY the right to direct CONSULTANT as to the details of doing the work or to exercise a measure of control over the work means that CONSULTANT will follow the direction of the CITY as to end results of the work only.
23. AUDIT OF RECORDS. CONSULTANT will maintain full and accurate records with respect to all services and matters covered under this Agreement. CITY will have free access at all reasonable times to such records, and the right to examine and audit the same and to make transcript therefrom, and to inspect all program data, documents, proceedings and activities. CONSULTANT will retain such financial and program service records for at least three (3) years after termination or final payment under this Agreement.
-113-
City of Bellflower
Agreement No. 502.16
Onward Engineering
24. INSURANCE.
A.Before commencing performance under this Agreement, and at all other times this Agreement is effective, CONSULTANT will procure and maintain the following types of insurance with coverage limits complying, at a minimum, with the limits set forth below:
Type of Insurance Limits
Commercial general liability:$2,000,000
Professional Liability $1,000,000
Business automobile liability $1,000,000
Workers compensation Statutory requirement
B.Commercial general liability insurance will meet or exceed the requirements of the most recent ISO-CGL Forms. The amount of insurance set forth above will be a combined single limit per occurrence for bodily injury, personal injury, and property damage for the policy coverage. Liability policies will be endorsed to name CITY, its officials, and employees as “additional insureds” under said insurance coverage and to state that such insurance will be deemed “primary” such that any other insurance that may be carried by CITY will be excess thereto. Such insurance will be on an “occurrence,” not a “claims made,” basis and will not be cancelable or subject to reduction except upon thirty (30) days prior written notice to CITY.
C. Professional liability coverage will be on an “occurrence basis” if such coverage is available, or on a “claims made” basis if not available. When coverage is provided on a “claims made basis,” CONSULTANT will continue to renew the insurance for a period of three (3) years after this Agreement expires or is terminated. Such insurance will have the same coverage and limits as the policy that was in effect during the term of this Agreement, and will cover CONSULTANT for all claims made by CITY arising out of any errors or omissions of CONSULTANT, or its officers, employees or agents during the time this Agreement was in effect.
D. Automobile coverage will be written on ISO Business Auto Coverage Form CA 00 01 06 92, including symbol 1 (Any Auto).
E.CONSULTANT will furnish to CITY duly authenticated Certificates of Insurance evidencing maintenance of the insurance required under this Agreement and such other evidence of insurance or copies of policies as -114-
City of Bellflower
Agreement No. 502.16
Onward Engineering
may be reasonably required by CITY from time to time. Insurance must be placed with insurers with a current A.M. Best Company Rating equivalent to at least a Rating of “A:VII.”
F.Should CONSULTANT, for any reason, fail to obtain and maintain the insurance required by this Agreement, CITY may obtain such coverage at CONSULTANT’s expense and deduct the cost of such insurance from payments due to CONSULTANT under this Agreement or terminate pursuant to Section 17.
G. Self-Insured Retention/Deductibles. All policies required by this Agreement must allow CITY, as additional insured, to satisfy the self-insured retention (“SIR”) and deductible of the policy in lieu of CONSULTANT (as the named insured) should CONSULTANT fail to pay the SIR or deductible requirements. The amount of the SIR or deductible is subject to the approval of the Assistant City Attorney and the Finance Director. CONSULTANT understands and agrees that satisfaction of this requirement is an express condition precedent to the effectiveness of this Agreement. Failure by CONSULTANT as primary insured to pay its SIR or deductible constitutes a material breach of this Agreement. Should CITY pay the SIR or deductible on CITY’s behalf upon the CONSULTANT’S failure or refusal to do so in order to secure defense and indemnification as an additional insured under the policy, CITY may include such amounts as damages in any action against CONSULTANT for breach of this Agreement in addition to any other damages incurred by CITY due to the breach.
25. USE OF SUBCONTRACTORS. CONSULTANT must obtain CITY’s prior written approval to use any consultants while performing any portion of this Agreement. Such approval must approve of the proposed consultant and the terms of compensation.
26. INCIDENTAL TASKS. CONSULTANT will meet with CITY monthly to provide the status on the project, which will include a schedule update and a short narrative description of progress during the past month for each major task, a description of the work remaining and a description of the work to be done before the next schedule update.
27. NOTICES. All communications to either party by the other party will be deemed made when received by such party at its respective name and address as follows:
If to CONSULTANT:If to CITY:
Attention:Muhammad Ataya
Vice President
Attention:Len Gorecki, Assistant City
Manager/Director of Public Works
Onward Engineering City of Bellflower
300 S. Harbor Blvd.9944 Flora Vista St.
Anaheim, CA 92805 Bellflower, CA 90706
714-495-1435 562-804-1424 x 2217
[email protected] [email protected]
-115-
City of Bellflower
Agreement No. 502.16
Onward Engineering
Any such written communications by mail will be conclusively deemed to have been received by the addressee upon deposit thereof in the United States Mail, postage prepaid and properly addressed as noted above. In all other instances, notices will be deemed given at the time of actual delivery. Changes may be made in the names or addresses of persons to whom notices are to be given by giving notice in the manner prescribed in this paragraph.
28. CONFLICT OF INTEREST. CONSULTANT will comply with all conflict of interest laws and regulations including, without limitation, CITY’s conflict of interest regulations.
29. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor retained any company or person, other than CONSULTANT’s bona fide employee, to solicit or secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed to pay any company or person, other than CONSULTANT’s bona fide employee, any fee, commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting from the award or making of this Agreement. Should CONSULTANT breach or violate this warranty, CITY may rescind this Agreement without liability.
30. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any other party. There will be no incidental or other beneficiaries of any of CONSULTANT’s or CITY’s obligations under this Agreement.
31. INTERPRETATION. This Agreement was drafted in and will be construed in accordance with the laws of the State of California, and exclusive venue for any action involving this agreement will be in the Los Angeles County.
32. COMPLIANCE WITH LAW. CONSULTANT agrees to comply with all federal, state, and local laws applicable to this Agreement.
33. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire understanding of the parties. There are no other understandings, terms or other agreements expressed or implied, oral or written. There are four Attachments to this Agreement. This Agreement will bind and inure to the benefit of the parties to this Agreement and any subsequent successors and assigns.
34. RULES OF CONSTRUCTION. Each Party had the opportunity to independently review this Agreement with legal counsel. Accordingly, this Agreement will be construed simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for or against either Party.
-116-
City of Bellflower
Agreement No. 502.16
Onward Engineering
35. SEVERABILITY. If any portion of this Agreement is declared by a court of competent jurisdiction to be invalid or unenforceable, then such portion will be deemed modified to the extent necessary in the opinion of the court to render such portion enforceable and, as so modified, such portion and the balance of this Agreement will continue in full force and effect.
36. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary action has been taken by the Parties to authorize the undersigned to execute this Agreement and to engage in the actions described herein. This Agreement may be modified by written amendment. CITY’s Manager, or designee, may execute any such amendment on behalf of CITY.
37. ELECTRONIC SIGNATURES. This Agreement may be executed by the Parties on any number of separate counterparts, and all such counterparts so executed constitute one Agreement binding on all the Parties notwithstanding that all the Parties are not signatories to the same counterpart. In accordance with Government Code §16.5, the Parties agree that this Agreement, Agreements ancillary to this Agreement, and related documents to be entered into in connection with this Agreement will be considered signed when the signature of a party is delivered by electronic transmission. Such electronic signature will be treated in all respects as having the same effect as an original signature.
38. CAPTIONS. The captions of the paragraphs of this Agreement are for convenience of reference only and will not affect the interpretation of this Agreement.
39. TIME IS OF ESSENCE. Time is of the essence for each and every provision of this Agreement.
40. FORCE MAJEURE. Should performance of this Agreement be prevented due to fire, flood, explosion, acts of terrorism, war, embargo, government action, civil or military authority, the natural elements, or other similar causes beyond the Parties’ reasonable control, then the Agreement will immediately terminate without obligation of either party to the other.
41. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its financial resources, surety and insurance experience, service experience, completion ability, personnel, current workload, experience in dealing with private consultants, and experience in dealing with public agencies all suggest that CONSULTANT is capable of performing the proposed contract and has a demonstrated capacity to deal fairly and effectively with and to satisfy a public CITY. -117-
City of Bellflower
Agreement No. 502.16
Onward Engineering
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the day and year first hereinabove written.
CITY OF BELLFLOWER ONWARD ENGINEERING
__________________________________________________________ Ryan Smoot, City Manager Muhammad Ataya, Vice President ATTEST:
_____________________________
Mayra Ochiqui, City Clerk
APPROVED AS TO FORM:
_____________________________
Karl H. Berger, City Attorney Taxpayer ID No.80-0101723 ATTACHMENTS:
Exhibit A - Scope of Services
Exhibit B - Fee Schedule
Exhibit C - Standard Task Order Form
Exhibit D - Proposal of Services
-118-
AGREEMENT FILE NO. 502.16
EXHIBIT A – SCOPE OF SERVICES
1. Consultant shall provide construction management and inspection services during the construction of federal/state/local funded public works projects. Scope of the inspection and construction management needs shall be on a project by project basis. The actual cost of the inspection services and construction management (CI/CM) will depend upon hourly rate and number of hours of inspection and CM provided. Consultant shall provide daily detailed inspection services to verify that the contract is sufficiently administered and monitored during construction. The on- call agreement may also be utilized for inspections for permitted work in the public right-of-way.
2. Consultant shall prepare and submit daily inspection reports to the City’s Project Manager and City Inspector for signature at the end of each work day. Consultant shall provide to the City a photo log of the project construction prior to and at the end of the construction period.
3. Consultant shall maintain all construction related project files in accordance with Caltrans’ Local Assistance Procedures Manual Chapter 16.
4. Consultant shall coordinate and direct a pre-construction meeting and prepare minutes thereof for each project in which selected to perform CM/CI.
5. Consultant shall interpret the drawings and specifications, including the preparation of elementary sketches, to clarify design details for the proposed resurface project and resolve field conflicts after consultation with City staff.
6. Consultant shall review applicable shop drawings, working drawings, requests for information, manufacturer’s certificates of compliance, mix designs, samples and all other data required to be submitted by the contractor for conformity with the contract plans and specifications. Ensure compliance with City’s Quality Assurance Plan. Document and submit responses to the contractor and to the City after consultation with City staff.
7. Consultant shall evaluate and determine the acceptability of substitute materials and equipment proposed by the contractor and provide recommendations to the City.
8. The Consultant's Construction Manager/Inspector shall report in writing to the Contractor, City’s Project Manager and Resident Engineer once each week to provide an update on progress of the work.
9. Consultant shall evaluate change order requests with regard to both time and payment, and Requests for Information (RFI) as stated in the City's Contract -119-
Documents, coordinate review with Resident Engineer and design professional of record, advise whether the original design intent is thereby altered, and provide recommendations to the City.
10. Consultant shall monitor contract schedule and construction time, conduct all required employee interviews and review of all certified payrolls.
11. Consultant shall review contractor's monthly Progress Payment Requests and make recommendation for approval to the City and prepare and process progress payment requests on the City's forms for approval. Consultant shall ensure written concurrence of contractor on quantities for each Progress Payment or identify any potential claim.
12. In accordance with the City’s Quality Assurance Program, consultant shall coordinate, observe, and approve all tests and other requirements. Consultant shall coordinate both materials testing and independent assurance testing.
13. Consultant shall schedule and coordinate weekly project status meetings.
14. Consultant in coordination with City staff shall prepare a punch list, identify all construction deficiencies, mediate the resolution of such with the contractor prior to final inspection, and provide a written recommendation of final acceptance for the project to the City.
15. Consultant shall coordinate revision of the final design drawings (AutoCAD and PDF) to reflect "As-Built" conditions by contractor in conjunction with the design professional of record based on furnished information, field sketches, and records kept during construction. Contractor shall provide one set of "As-Built" plans on Mylar to the City along with electronic files.
16. At the end of the project, consultant shall assure the contractor provides the City with three (3) copies of any applicable Operation and Maintenance (O&M) Manual, shop drawings, equipment catalog cuts, maintenance manuals supplied by the manufacturers of the equipment, warranties and guarantees associated with installed equipment, and any spare parts that are supplied by the manufacturers.
On-call construction and inspection services are anticipated to include: grinding, crack filling, localized dig outs, ARHM/TRMAC/Conventional A/C, leveling course, base material placement, concrete removal and replacement (alley approaches, curb ramps, drive aprons, sidewalk, curb and gutter), loop detector placement, tree removal, utility adjustments, landscaping, traffic signal placement, park construction, concrete, demolition, landscaping and other miscellaneous scopes of work. -120-
AGREEMENT FILE NO. 502.16
EXHIBIT B – FEE SCHEDULE
Classification Rate/Hour
Construction
Manager $185.00
Construction
Inspector $145.00
Public
Outreach $95.00
Construction
Inspector (OT)$180.00
Construction
Inspector (DT)$195.00
-121-
EXHIBIT C – TASK ORDER STANDARD FORM
CITY OF BELLFLOWER
AGREEMENT FILE NO. 502.16
TASK ORDER NO. X
______________________________________________________________________ Date Prepared:
Consultant/Contractor Name:
Project Name:
Account Number:
Total Cost:
Description of services to be performed under this Task Order:
Recommended/Approved by:
Len Gorecki, Assistant City Manager/Director
of Public Works
Date
Ryan Smoot, City Manager Date
-122-
-123-
:1 !;u".:=f
cnflMAR ENGINEERING
(1051,": S":r;"w 1
Harbor Boulevard.
)
300$
6k
w
mu
m
m
8 an
2 ”wn
e
9 ..
.
m
w
A aut
o
C.
lfl
m
en
C
"
e wok
b
m
«M
a
w
m
d
w4
.
M.
”3
.
3 a
E
-
M
E
7 R
m TI.
.
.
a
m
w
On
w
a
r
d
E
n
g
i
n
e
e
r
i
n
g
|
D
e
s
i
g
n
S
m
a
r
t
e
r
.
B
u
i
l
d
B
e
t
t
e
r
.
Onward Engineering
300 S. Harbor Blvd., Suite 814
Anaheim, CA 92805
(714) 533.3050 | www.oe-eng.com
1 City of Bellflower August 19th, 2024
City Clerk’s Office
16600 Civic Center Drive
Bellflower, CA 90706
Attn: Kimberly Gonzalez, Public Works Coordinator
[email protected]
Subject: requeSt for propoSalS for on-call conStruction management and inSpection ServiceS for federal/State/local funded public workS projectS Onward Engineering (OE) is pleased to submit this proposal to the City of Bellflower to provide On-Call Construction Management and Inspection Services for Federal/State/Local Funded Public Works Projects. Since 2004, OE has developed and enhanced our approach to public works projects. We have had the honor and pleasure of coordinating projects with many nearby City Clients, including the Cities of Montebello, Norwalk, Santa Fe Springs, Cerritos, Downey, Lynwood, South Gate, and Pico Rivera, among others.
From familiarity and experience in Caltrans and Federal Highway Administration (FHWA) documentation, to understanding the guidelines for processing and obtaining grants and funding, to detailed inspection monitoring adhering to project scheduling, staffing, safety regulations and delivering regular and detailed project-related reports to the City, to advancing solutions when faced with change orders and protocal adjustments, our Team has the experience, knowledge and the tools in place to fit the City’s needs. We train our staff in maintaining open and responsive lines of communication with our Clients. We are advocates on behalf of the City. If the City ever has any concern or issue, we will be here to listen, adapt, and adjust to satisfy the City’s needs and to help meet the City’s goals on every assignment. We value our relationship with the City of Bellflower, and will always protect that relationship by being honest and transparent.
When providing consulting services on public works projects, maintaining a positive public perception is paramount to success. We apply multiple mediums for community coordination. OE’s real-time project maps web page, enhanced public notices, and a customized telephone hotline allows stakeholders to understand the project, check on its status, and communicate any concerns. Additionally, organization and safety are a chief concern. This starts with preparing detailed reports and photo diaries in real-time for the City to review, alleviating any headaches by applying these services. We will tailor our approach and be nimble and responsive to all our assignments.
I would like to thank the City of Bellflower for the opportunity to submit our proposal. If you have any questions, or would like any additional information, please feel free to contact me at: (714) 533-3050, or by email at: mataya@oe- eng.com. We have read, understand, and accept all terms and conditions as set forth in the City of Bellflower’s RFP and Professional Services Agreement, with no exceptions. We look forward to a successful relationship with the City of Bellflower and we thank you for the opportunity to serve.
The information contained in this Proposal or any part thereof, including its exhibits, schedules, and other documents and instruments delivered or to be delivered to the City, are true, accurate, and complete to the knowledge of Onward Engineering. This Proposal includes all information necessary to ensure that the statements therein do not in whole or in part mislead the City as to any material facts.
This proposal is a firm offer for 180 days from the submission date.
Thank you,
Majdi Ataya, PE
President, Onward Engineering
-124-
On
w
a
r
d
E
n
g
i
n
e
e
r
i
n
g
|
D
e
s
i
g
n
S
m
a
r
t
e
r
.
B
u
i
l
d
B
e
t
t
e
r
.
At Onward Engineering (OE), our mission is to set a new standard of excellence in consulting services for our clients, ultimately enhancing the quality of life in the communities we serve.
mISSIon
Statement
Incorporated Year 2004
as a “c” Corporation in
the state of CA. 20 Years
in business 34 Employees
deSIgn Engineering
project Management
conStructIon Management
Staff Augmentation
plan Check
conStructIon Inspection
Surveying
California Secretary of
State business entity
number: C2640309
firm
detailS
profeSSional
ServIceS
firm
HIStory
Onward Engineering
300 S. Harbor Blvd.
Suite 814, Anaheim, CA 92805
(714) 533.3050 | [email protected]
legal name &
addreSS
Firm’s general inFormation
SECTION 6.1.1.1: Introduction
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 2 executive summary
OE has provided local agencies with our expertise on hundreds of Capital Improvement Projects (CIP) involving full- service construction management and inspection services to public agencies including projects which required Federal and State grants and documentation. OE was able to navigate these agencies and successfully obtain and manage funds through many local, State, and Federal Funding sources. Our experience is primarily on street and roadway improvements, including grind and overlay, reconstruction, maintenance (slurry and crack sealing), widening, beautification, traffic improvements, and pedestrian accessibility improvements. Our experience also extends to water, sewer, storm drain, and park improvement projects for which we’ve earned 3 awards: Bellflower-Riverview Park, Lynwood-Ricardo Lara Linear Park, and Lake Forest-Cherry Park.
We utilize Box Enterprise for project document control, allowing the City to have access to the project files in real- time and from any device. This is coupled with our proprietary construction tool Orange Vest, which allows us to document work in realtime, and have those quantities, materials, labor, and equipment automatically update quantity sheets, earned value charts, cost over time charts, quantity over time charts, and percent complete over time charts.
Organization and safety are some of our chief priorities when handling Construction Management and Inspection projects. These two issues entail a human element which is not easily read by looking at the plans. OE understands that behind every project are the people involved, and few firms prioritize this philosophy as much as OE does.
Additionally, maintaining a positive public perception is another priority that is paramount to the success of any project.
In regards to organization and public perception, we have applied multiple mediums which we use to distribute project information and we leverage them in providing communication, transparency and organization. This allows stakeholders to understand the project, check on the status of construction and enjoy continual updates, and to communicate relevant information or concerns. These platforms include OE’s real-time project maps, an informative online web page, enhanced methods for public notification along with communication, such as a customized project hotline, results in the public being informed, thereby developing a positive perception of those behind the project affecting them. introduction6.1.1.16.1.1.1
-125-
FeDeral FunDIng & state caltrans exPerIence
OE has provided Construction Management and Construction Inspection services on several Federally Funded projects requiring CDBG funding and Caltrans coordination.
A brief list of OE’s experience on Federal Funding and State Caltrans projects include:
brea Berry Street and Imperial Highway Sewer Main Replacement Rails to Trails Project
la habra heights Hacienda Road & East Road Stimulus Street Restoration la miraDa Adelfa, Foster & Marquardt Rehabilitation Projects lynwooD Imperial Highway Rehabilitation Project
Pico rivera Rosemead Boulevard Rehabilitation Project
norwalk Studebaker Road & Firestone Blvd. Rehabilitation Project Irvine Red Hill Avenue Pavement Rehabilitation Project
Campus Drive Bikeway Construction Project
bellFlower Bellflower Boulevard & Woodruff Avenue Rehabilitation Woodruff Avenue & Palo Verdes Avenue Rehabilitation
Flower Street Rehabilitation Project
costa mesa Harbor Boulevard & Gisler Avenue Intersection Project Placentia Avenue Median Installation & Landscaping
santa Fe sPrings I-5 Widening Project at Florence Avenue DiamonD bar Residential Area 2 & Arterial Zone 1 Rehabilitation south gate Atlantic Avenue/Firestone Blvd. Intersection Widening reDonDo beach Aviation Boulevard Resurfacing Project (STPL) cerritos Studebaker Road Rehabilitation Project
la habra La Habra Boulevard Rehabilitation Project
costa mesa Bay Street & Ford Road Alley Reconstruction Project commerce Rosini & Rosewood Rehabilitation Project (Phase I) Bristow Park Neighborhood Rehabilitation Project
torrance Torrance Citywide Bus Stop Accessibility Improvement Project Sidewalk Repair for Handicap Accessibility, I-135
la habra 4 Segment Alley Pavement Rehabilitation (Phase I & II) hesPeria FY 2018-19 CDBG Residential Street Improvements, C.O. No. 7150 south el monte CDBG Street Improvements Project
lake Forest ADA Access Ramp Improvement Project - Phase II - PW 2017-09 ADA Access Ramp Improvements, Phases 13 Thru 17 Project ADA Access Ramp Improvements Phase 7
hawaiian garDens Residential Rehabilitation Project
reDonDo beach Citywide Curb Ramp Improvements (Phase III) Placentia ADA Accessible Ramp Phase III
Sidewalk/Pedestrian Accessibility Project (Phase II)
Pico rivera Telegraph Road Median Improvements & Rehabilitation costa mesa Placentia Avenue Median Installation & Landscaping orange county Santiago Canyon Road Project
bellFlower Bellflower Boulevard Complete Streets Project la miraDa Adelfa, Foster & Marquardt Rehabilitation Projects la habra heights Hacienda Road & East Road Stimulus Street Restoration Irvine Red Hill Avenue Pavement Rehabilitation Project
norwalk Bus Shelter Replacement Project
Studebaker Road & Firestone Boulevard Rehabilitation
lynwooD Otis Street Improvement
Martin Luther King Jr. Boulevard Rehabilitation
brea Blackstone Development Project
la habra heights Road Improvements & Slope Stabilization lake Forest Lake Forest Drive Resurfacing, from Bake Parkway to I-5 Freeway alhambra FY 17-18 SB1 Street Rehabilitation Project
Fullerton Euclid Roadway & Sewer Reconstruction Project oe’S 3 unIque
approacHeS
1 Our cost control methods
that include planning
and implementing
scheduling objectives
through continuous
monitoring of project cost,
quantities, estimation and
performance.
2 Emphasis in safety,
quality, and open lines of
communication with the
City, proejct staff and the
public.
3 Knowledge in coordinating
with both Caltrans
& Federal Funding
departments.
oe’S caltranS
approacH
1 Submit Requests for
Authorization (RFA’s) for
Preliminary Engineering,
Right-of-Way, and utility
and construction.
2 Prepare and submit award
& report on expenditures.
3 Assist in the preparation
of both Federal and State
invoices.
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 3 SECTION 6.1.1.1: Introduction
-126-
5 __
_
__
_.
_
_
_
_
_
_
_
_
an
@.
Q
Q
SECTION :
General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture & Landscape Architecture, Geotechnical Engineering/Geology & Material Testing, & Staff Augmentation On-Call Professional Services 4 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 4 co
n
Str
u
c
t
i
o
n
m
a
n
a
g
e
r
S
co
n
Str
u
c
t
i
o
n
i
n
Spe
c
t
o
r
S
principal-in-cHarge
Sub-conSultant
S econdary contact
100% avaIlabIlIty In may 2024
jeffrey eaton - qSp
3 years: Course Studeis & Computer
Science, CSUF, 2004
as: Construction Management,
Santiago Canyon College
qsP: Qualified Stormwater Practitioner100%
available
100% avaIlabIlIty In october 2024
tImotHy Stanley
coursework: Public Works Inspection,
Business Administration & Computer
Technology
caltrans certiFieD: 375: AC
Pavement In-Place Density | 201: Sample
Preparation | 539: Concrete Sampling |
533: Ball Penetration
100%
available
100% avaIlabIlIty In august 2024
kevIn green
ba: Psychology, Sociology & Business,
La Sierra University
certiFieD: SWPPP & Radiation Safety
training: 10 & 30 MSHA & Nuclear Gauge;
OSHA: 40hr Training Certification; QSD & P;
Rapid Set Concrete; Trenching & Shoring Safety;
Confined Workspace; Asbestos Awareness
100%
available
100% avaIlabIlIty In august 2024
joe ZamarrIpa
certiFieD: Public Works Inspection,
-Santiago Canyon College
100% avaIlabIlIty In aPrIl 2025
jorge roque
Degree: Civil Engineering, Instituto
Tecnologico Centro Americano,
-El Salvador
100%
available
100% avaIlabIlIty In august 2024
ruben rocHa
coursework: Business Admin/
Management, Mt. San Jacinot College,
Menifee, CA.
certiFieD: Traffic Signal/ADA Ramp Inspector;
Public Works Inspector, County of Orange;
Field Tech. & Aggregate Test Lab Tech Level 1 &
Trenching & Excavation Awareness
caltrans: No’s.125/216/231/504/518/523/5
24/533/539.
100%
available
100% avaIlabIlIty In august 2024
cHrIS boren
level I & II: Public Works Inspector
exPerience: Capital Improvement Projects; Federal Funding; Caltrans Coordination; Nuclear Densometer Work; Encroachment Permitsavailable 100% avaIlabIlIty In aPrIl 2025
mark luera
courses: Public Works Estimation &
Interpretation, Citrus College
100% avaIlabIlIty In sePtember 2024
robert valle - qSd, cISec
qsP: Qualified Stormwater Pollution Prevention Plan Practitioner #26670 cisec: certIFIeD Inspector: Sediment & Erosion Control #2075 30 yrs: Public Works Inspector - County of Orange
100%
available
100% avaIlabIlIty In august 2024
mIcHael nguyen
aa: Industrial Technology & 60 units:
Mechanical Engineering, Cal Poly, Pomona
16 years: Public Works Inspection
- County of Orange
100% avaIlabIlIty In november 2024
ron oStendorf
exPerIence: Caltrans Coordination,
Trenching, Traffic Control & Safety
Training
100%
STATEMENT: *Key personnel will be available to the extent proposed for the duration of the services. No person designated as key personnel shall be removed or replaced without the prior written consent of Bellflower. organizational chart
100% avaIlabIlIty In august 2024
armando r. caStaÑeda
ac
certiFicates: • Construction Inspection Workshop, APWA
• Valve Trouble Shooting/Wire Tracing/Water Management/Controller Programming, CLCA • Soil Management/Landscape Design, CalPoly
• Hazardous Waste Operations & Emergency Response, Public Safety Council 100%
available
40% avaIlabIlIty as oF august 2024
juStIn SmeetS - pe, plS, qSd
bs: Civil Engineering, CSUF, 2007
Pe: Professional Engineer #78314
Pls: Land Surveyor #9293
qsD: SWPPP Developer #00852
octa (prior) certiFieD Pavement Analysis100available
100% avaIlabIlIty as oF august 2024
raSHId “raSH” Syed - pe
bs: Civil Engineering, Hyderabad Polytech
ba: Public Administration, CSULB
mba: Public Administration, CSULB
available
60% avaIlabIlIty as oF august 2024
delfIno “cHIno conSunjI- pe
bs: Civil Engineering,
University of the Phillippines, 1986
Pe: Professional Engineer #57908
•Engineering Management,
Construction, UCLA Extension, 1991
•Building Construction and,
Construction, AOTS Japan, 1990
•Inland Navigation/Management, IFIT Belgium, 1989
100%
available
80% avaIlabIlIty as oF august 2024
ludwIg “ludy” SmeetS - pe
bs: Civil Engineering, CSULB, 1979
ma: Military Science, A&M, 1990
us army: Command/General Staff College, 1989
Pe: Professional Engineer #37221
member: APWA, ASCE, NSPE, SAME100%
available
majdI ataya - pe
bs: Civil Engineering, CSULB, 1981
m Pa: All Coursework, CSULB, 1993
Pe: Professional Engineer #39392
city oF la habra:(former) Deputy
Director of Public Works & City Engineer100%
available
muHammad ataya - mpa
bs: Political Science, CSULB, 2008
m Pa: Public Administration, CSULB, 2010
certiFicate: CM, UCLA, 2013
Staffing6.1.1.26.1.1.2
aragon, Inc.
luis arguello, ms, eit
Project Engineer/Manager
(951) 776-0345 | aragongeo.com
16801 Van Buren Blvd., Riverside, CA 92504
Geotech Investigation
-127-80
0 31
:
@
0 an
on
@
w M”
.
m
.
%
majd I ataya , Pe
qa/qc manager
43 yearS of exPerience20
yearS witH Firm
FielDs oF exPertise:
ROADWAY WIDENING PAVEMENT ADA RAMP SIDEWALK
qualIFIcatIons
pe #39392: Registered Civil Engineer • bS: Civil Engineering California State University, Long Beach, 1981 • mpa : Full Coursework California State University, Long Beach, 1993 • Former tac cHairman Orange County Transportation Authority • (former) preSident: Engineer’s Flood Control Advisory Committee • (former) preSident & Honoree: Engineer’s Association of Orange County
backgrounD
Majdi is the Principal-In-Charge of Ownard Engineering. Majdi Ataya, Professional Engineer and Former Deputy Director and City Engineer for the City of La Habra’s Public Works Department, is a seasoned engineer with over 43 years of solid and diversified experience in the public works sector. He is extremely familiar with the process of project management and design. He is a highly effective communicator and manager with an outstanding assimilation ability. Majdi is able to adapt and relate to all levels of management, and retain high energy levels and enthusiasm for the project at hand. Majdi understands the importance of excellent communication with public agencies and will be a dependable extension of your staff. exPerIence
Fy 2023-24 Pavement management Program ImPlementation Project, glenDale Majdi served as the QA/QC Manager to the City of Glendale on the Fiscal Year 2023 to 2024 Pavement Management Program Implementation Project. The purpose of this project was to rehabilitate approximately 48,650 linear feet (9.2 miles) of street, a total of 60 streets in all. OE was tasked with providing designs for pavement resurfacing and reconstruction; curb, gutter and sidewalk repairs at 9 separate locations; a total of 124 ADA curb ramps and driveways construction; catch basin enhancements; bus stop improvements and relocations; sewer point repairs; tree well installation and tree planting; utility appurtenance adjustments and relocations; signing and striping; and surveying well monument installations and replacements. Additional work included sewer video inspection to identify sewer defects and preparing sanitary sewer plans for repairs that included point repairs, and sectional and full-length slip lining, along with Traffic Control plans. OE also acquired no-fee permits for ground distrubance work within the City’s right-of-way. DATE: 2024
Fy 2022-23 annual Pavement rehabIlItatIon Project, Phases 1-4, whIttIer Majdi provided QA/QC Management services to the City of Whittier through 4 phases of their Annual Pavement Rehabilitation Project. The project purpose was to rehabilitate approximately 49,000 linear feet (9.3 miles) of 46 streets with a variety of slurry and cape seal, and grind and overlay in order to achieve an extended pavement service life while minimizing future maintenance needs, improve safety and enhance aesthetics. The required work involved pavement, curb, gutter and sidewalk repair and rehabilitation, reconstructing 62 ADA curb ramps (52 with missing truncated domes), replacing 9 cross gutters, utility appurtenance adjusting and relocating, and signing and striping.
The project also required Caltrans Encroachment Permits for streets around Whittier Boulevard, and permits for the Union Pacific Railroad (UPRR) due to street proximity to the right-of-way on the southwest end. OE’s in-house Laser Scanner was utilized to capture visible indications of surface utilities, trees, utility poles, luminaries, fencing, walls, sidewalks, hardscape, signs, and edge of pavement lying within the ramp locations, as well as lip of gutter, flow-line, top of curb, and back of walk elevations were documented. The survey also extended beyond the ramp’s BCRs/ECRs to ensure proper tie-in to the existing infrastructure. DATE : 2022 SECTION : Resumes
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 5 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 6 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -128-
@@O r-: .. a a.
.
.
1. — 71.
I.
F
.n
.l
H
.
I
/ . 4 v )
:2
1;... a 5; PC: JEN
IrvIne center DrIve Pavement rehabIlItatIon, irvineMajdi was the QA/QC Manager for the City of Irvine to r e
h
a
b
i
l
i
t
a
t
e
1 .
5 m
i
l
e
s
o
f
t
h
i
s
6 -
l
a
n
e
a
r
t
e
r
i
a
l
a
n
d
m
a
j
o
r
thoroughfare. The project spanned Irvine Center Drive, fr o
m
J
e
f
f
r
e
y
R
o
a
d
t
o
C
u
l
v
e
r
D
r
i
v
e
,
a
n
d
t
h
e
d
e
s
i
g
n
p
h
a
s
e
included stretches of full-depth reconstruction combined w
i
t
h
a
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
o
f
t
h
e
e
n
t
i
r
e
r
o
a
d
w
a
y
,
6 ,
3 0
0 S
F
of sidewalk, 15,800 LF of median curb, 136 traffic loops, 30,0 0 0
S
F
o
f
l
a
n
d
s
c
a
p
i
n
g
a
n
d
i
r
r
i
g
a
t
i
o
n
,
a
n
d
u
p
g
r
a
d
i
n
g
r
a
m
p
s
to meet ADA compliance. Plans included full plan and profile v
i
e
w
,
s
t
r
i
p
i
n
g
a
n
d
s
i
g
n
i
n
g
p
l
a
n
s
,
t
r
a
f
f
i
c
c
o
n
t
r
o
l
,
p
h
a
s
i
n
g
plans, landscaping plans, construction specifications, an d
e
n
g
i
n
e
e
r
’
s
e
s
t
i
m
a
t
e
.
O
E
w
a
s
r
e
q
u
i
r
e
d
t
o
s
u
b
m
i
t
d
r
a
f
t
plans to utility agencies to ensure conflicts were not enco u
n
t
e
r
e
d
d
u
r
i
n
g
c
o
n
s
t
r
u
c
t
i
o
n
.
A
l
o
n
g
w
i
t
h
t
h
e
d
e
s
i
g
n
,
O
E
also provided construction support services, including resp o
n
d
i
n
g
t
o
R
F
I
s
,
a
t
t
e
n
d
i
n
g
m
e
e
t
i
n
g
s
,
p
r
o
v
i
d
i
n
g
a
s
s
i
s
t
a
n
c
e
related to change orders, and reviewing contractor’s sub m
i
t
t
a
l
s
f
o
r
c
o
n
f
o
r
m
a
n
c
e
w
i
t
h
c
o
n
t
r
a
c
t
d
o
c
u
m
e
n
t
s
.
O
E
prepared as-built documentation in accordance with the Ci t
y
o
f
I
r
v
i
n
e
s
t
a
n
d
a
r
d
s
.
DATE: 08/2008-01/2009nIguel roaD street rehabIlItatIon Project, laguna nIguelMajdi was the QA/QC Manager to the City of Laguna Niguel.
T
h
e
p
r
o
j
e
c
t
c
o
n
s
i
s
t
e
d
o
f
r
e
h
a
b
i
l
i
t
a
t
i
n
g
a
n
a
p
p
r
o
x
i
m
a
t
e
l
y
1.93 mile (10,200-foot) section of Niguel Road that exten d
s
f
r
o
m
A
l
t
a
T
e
r
a
t
o
M
a
r
i
n
a
H
i
l
l
s
D
r
i
v
e
.
N
i
g
u
e
l
R
o
a
d
f
r
o
m
Highland Avenue to Marina Hills Drive (8,450 linear feet) i
s
a
n
a
r
t
e
r
i
a
l
s
t
r
e
e
t
w
i
t
h
t
w
o
l
a
n
e
s
o
f
t
r
a
f
f
i
c
i
n
e
i
t
h
e
r
direction, raised center medians, centerline striping, left a
n
d
r
i
g
h
t
-
t
u
r
n
p
o
c
k
e
t
s
,
a
n
d
b
i
k
e
l
a
n
e
s
.
N
i
g
u
e
l
R
o
a
d
f
r
o
m
Alta Terra to Highland Avenue is a residential collector stree t
(
1 ,
7 5
0 -
f
e
e
t
)
w
i
t
h
o
n
e
l
a
n
e
o
f
t
r
a
f
f
i
c
i
n
b
o
t
h
d
i
r
e
c
t
i
o
n
s
.
A
major part of this project involves the full design of the 64 r
a
m
p
s
f
o
r
t
h
e
n
e
a
r
l
y
2 m
i
l
e
s
t
r
e
t
c
h
h
i
l
l
y
r
o
a
d
w
a
y
.
P
a
r
k
i
n
g
was prohibited on the street except on the north side of Ni g
u
e
l
R
o
a
d
f
r
o
m
A
l
t
a
T
e
r
r
a
t
o
G
a
l
i
n
a
W
a
y
w
h
i
c
h
r
e
q
u
i
r
e
d
traffic management. Additional tasks included repairing cu r
b
,
g
u
t
t
e
r
,
a
n
d
s
i
d
e
w
a
l
k
a
n
d
c
o
n
s
t
r
u
c
t
i
n
g
A
D
A
c
o
m
p
l
i
a
n
t
access ramps where required. DATE: 2020
aDa access ramP ImProvements, Phases 13-17, lake ForestMajdi was the QA/QC Manager for the City of Lake Forest o n
p
h
a
s
e
s
1 3
-
1 7
o
f
t
h
i
s
p
r
o
j
e
c
t
,
w
h
i
c
h
w
a
s
f
u
n
d
e
d
t
h
r
o
u
g
h
the Community Development Block Grant. The goal of the
p
r
o
j
e
c
t
i
s
t
o
r
e
-
d
e
s
i
g
n
e
x
i
s
t
i
n
g
a
c
c
e
s
s
r
a
m
p
s
t
o
m
e
e
t
compliance with the ADA State of California Building Code, T
i
t
l
e
2 4
S
t
a
n
d
a
r
d
s
a
l
o
n
g
w
i
t
h
C
o
u
n
t
y
o
f
O
r
a
n
g
e
S
t
a
n
d
a
r
d
Plans, requiring a full cultural resources study and report of
C
a
l
i
f
o
r
n
i
a
H
i
s
t
o
r
i
c
a
l
R
e
s
o
u
r
c
e
s
,
a
S
a
c
r
e
d
L
a
n
d
s
s
e
a
r
c
h
,
a Reconnaissance Report, and a pedestrian field survey of t
h
e
p
r
o
j
e
c
t
a
r
e
a
.
T
h
i
s
5 p
h
a
s
e
p
r
o
j
e
c
t
r
e
q
u
i
r
e
s
a
t
o
t
a
l
o
f
113 ramp designs, reconstruction and replacement for a peri o
d
o
f
3 .
5 y
e
a
r
s
.
T
h
e
r
a
m
p
s
c
o
m
p
o
n
e
n
t
s
i
n
c
l
u
d
e
s
l
a
n
d
i
n
g
widths, side flares, and landing/running/counter and sid e
w
a
l
k
c
r
o
s
s
s
l
o
p
e
s
.
A
d
j
a
c
e
n
t
s
i
d
e
w
a
l
k
,
c
u
r
b
a
n
d
g
u
t
t
e
r
replacements are made as necessary to accommodate the
n
e
w
r
a
m
p
s
.
DATE: 2022culver DrIve Pavement rehabIlItatIon Project, IrvIneMajdi provided QA/QC Management services to the City of Ir v
i
n
e
o
n
t
h
e
C
u
l
v
e
r
D
r
i
v
e
P
a
v
e
m
e
n
t
R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
.
The project spanned 1,800 LF along Culver Drive, from the n
o
r
t
h
r
a
i
l
r
o
a
d
t
r
a
c
k
s
t
o
W
a
l
n
u
t
A
v
e
n
u
e
.
C
u
l
v
e
r
D
r
i
v
e
i
s
a
principal arterial roadway, providing northeast/southwest a c
c
e
s
s
t
h
r
o
u
g
h
t
h
e
w
e
s
t
e
r
n
p
o
r
t
i
o
n
s
o
f
t
h
e
C
i
t
y
o
f
I
r
v
i
n
e
,
while also serving as a primary travel route through a vari e
t
y
o
f
c
o
m
m
e
r
c
i
a
l
,
r
e
s
i
d
e
n
t
i
a
l
,
a
n
d
i
n
s
t
i
t
u
t
i
o
n
a
l
z
o
n
i
n
g
areas. OE designed localized pavement reconstruction at
t
h
e
n
o
r
t
h
b
o
u
n
d
#
3 l
a
n
e
a
n
d
t
h
e
s
o
u
t
h
b
o
u
n
d
#
1 l
a
n
e
,
where pavement conditions were considerably worse than a d
j
a
c
e
n
t
l
a
n
e
s
;
t
h
e
l
e
n
g
t
h
o
f
t
h
e
p
r
o
j
e
c
t
w
a
s
t
r
e
a
t
e
d
w
i
t
h
full-width 2-inch grind, a 2-inch AC leveling course, and 2-i n
c
h
A
R
H
M
o
v
e
r
l
a
y
.
T
h
e
p
r
o
j
e
c
t
a
l
s
o
e
n
t
a
i
l
e
d
r
e
m
o
v
i
n
g
a
n
d
replacing existing median shed gutter with a standard 8-in c
h
m
e
d
i
a
n
c
u
r
b
,
m
e
d
i
a
n
i
s
l
a
n
d
l
a
n
d
s
c
a
p
e
i
m
p
r
o
v
e
m
e
n
t
s
throughout, and ensuring ramps throughout the project w e
r
e
A
D
A
c
o
m
p
l
i
a
n
t
i
n
a
c
c
o
r
d
a
n
c
e
w
i
t
h
3 R
f
e
d
e
r
a
l
d
e
s
i
g
n
requirements for rehabilitation projects. DATE: 09/2010-03/2011 jamboree roaDway rehabIlItatIon Project, IrvIneMajdi provided QA/QC Management to the City of Irvine to re h
a
b
i
l
i
t
a
t
e
J
a
m
b
o
r
e
e
R
o
a
d
,
f
r
o
m
M
a
c
A
r
t
h
u
r
B
o
u
l
e
v
a
r
d
t
o
Campus Drive. The project limits are on Jamboree Rd. from M
a
c
A
r
t
h
u
r
B
l
v
d
.
,
4 0
0 ’
N
o
r
t
h
t
o
C
a
m
p
u
s
D
r
i
v
e
.
J
a
m
b
o
r
e
e
Road is a principal arterial roadway which provides northeast /
s
o
u
t
h
w
e
s
t
a
c
c
e
s
s
t
h
r
o
u
g
h
t
h
e
w
e
s
t
e
r
n
p
o
r
t
i
o
n
s
o
f
t
h
e
City of Irvine, it is also a major thoroughfare for beach traffi c
a
n
d
t
o
l
l
r
o
a
d
s
.
I
t
i
s
c
r
i
t
i
c
a
l
t
o
n
o
t
e
t
h
a
t
t
h
e
n
o
r
t
h
e
r
n
h
a
l
f
of Jamboree Rd. in the project limits is within the City of N
e
w
p
o
r
t
B
e
a
c
h
,
w
h
i
c
h
r
e
q
u
i
r
e
d
O
E
t
o
a
c
t
i
v
e
l
y
c
o
o
r
d
i
n
a
t
e
with the City and obtain approval for the final design of th e
p
r
o
j
e
c
t
.
T
h
e
d
e
s
i
g
n
i
n
c
l
u
d
e
d
t
h
e
p
r
e
p
a
r
a
t
i
o
n
o
f
c
r
o
s
s
sections to determine the limits of edge grinding for ARH M
o
v
e
r
l
a
y
.
T
h
e
s
c
o
p
e
o
f
w
o
r
k
a
l
s
o
i
n
c
l
u
d
e
d
6 ,
2 7
0 t
o
n
s
o
f
10-inch Full Depth AC, redesigning and detailing nine ram p
s
a
n
d
t
w
o
R
i
g
h
t
T
u
r
n
“
P
o
r
k
C
h
o
p
”
I
s
l
a
n
d
s
t
o
m
e
e
t
A
D
A
compliance, traffic loop installation, and installation of vide o
d
e
t
e
c
t
i
o
n
a
t
2 i
n
t
e
r
s
e
c
t
i
o
n
s
.
D
u
e
t
o
f
u
n
d
i
n
g
d
e
a
d
l
i
n
e
s
,
the city required an expedited design for the project. DATE: 06/2012-12/2012 SECTION : Resumes
RFP for On-Call Construction Management and Inspection Se r
v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower 6 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-129-
J
, L
muHammad ataya, mpa
PublIc outreach
16 yearS of exPerience12
yearS witH Firm
FielDs oF exPertise:
ROADWAY
ASPHALT
CONCRETE
CALTRANS
WIDENING
qualIFIcatIons
bs: Political Science, California State University, Long Beach, 2008 • m Pa : Public Administration, California State University, Long Beach, 2008 • certIFIcate: Construction Management, University of California, Los Angeles backgrounD
Muhammad received his BS in Political Science and Masters in Public Administration from California State University, Long Beach. As the Operations Manager for Onward Engineering, Muhammad is responsible for improving the operational systems, processes, and policies in support of the OE mission, managing and increasing the effectiveness and efficiency of the OE staff, and overseeing and training the OE administrative staff. Additionally, as the head of OE’s Business Development team, Muhammad directs the efforts of the OE proposal writing team and develops marketing programs and campaigns. Muhammad also provides public outreach services for select high-profile projects. This includes managing communication with businesses, residents, and stakeholders using a multitude of information dissemination methods.
exPerIence
neighborhooD resiDential streets ImProvement Project - Phases I & II, anaheim Muhammad provided Public Outreach services for the City of Anaheim on this project which encompassed street improvements on a number of residential neighborhoods. The goal of this project was to restore surface integrity, improve the ride quality and safety of the residential streets, and mitigate any potential trip and fall hazards. These large-scale residential neighborhood rehabilitation projects involved parkway improvements by resurfacing the pavement, removal and replacement of ADA access ramps, sidewalk, curb, cross gutters and concrete aprons, pavement markings, signage and driveway approaches. The project limits for phase I were split into thirteen neighborhood areas: 1 The Athena-Omega Neighborhood, with a population of 1,977 residents, is bordered by Ball Road to the north, Sunkist Street to the east, Winston Road to the south, and State College Boulevard to the west.
The scope involved 191,416 sf of asphalt reconstruction and 63,422 sf of slurry seal; 2 The Biscanye Neighborhood, with a population of 578 residents, is bound by Crestwood Lane to the north, Brookhurst Street to the east, Katella Avenue to the south, and Gilbert Street to the west. The scope included 109,760 sf of asphalt reconstruction and 110,483 sf of slurry seal; 3 The Devonshire Neighborhood, with a residential population of 1,551, is bound by by Buckingham Street and the Riverside I-91 Freeway to the north, Gilbert Street to the east, and the Santa Ana I-5 Freeway to the south. The scope included 245,498 sf of asphalt reconstruction; 4 The Jerillee Lane neighborhood, with a population of 1,365 residents, is bordered by the I-91 freeway to the north, Imperial Highway to the east, Santa Ana Canyon Road to the south, and Lakeview Avenue to the west. The scope of work included 312,892 sf of asphalt reconstruction and 63,422 sf of slurry seal; 5 The Key Lane/Westchester Neighborhood, with a population of 7,332 residents, is bound by Orange Avenue to the north, Western Avenue to the east, Ball Road to the south, and Knott Avenue to the west. The scope included 933,402 sf of asphalt reconstruction and 664,515 sf of slurry seal; 6 The La Reina Neighborhood has a population of 3,415 residents and is bordered by Crescent Avenue to the north, Gilbert Street to the east, Lincoln Avenue to the south, and Dale Avenue to the west. The scope included 554,186 sf of asphalt reconstruction; 7 The Rowland Neighborhood is bordered by Broadway to the north, Magnolia to the east, Rowland to the south, and Kenmore to the west. The scope of work involved 48,714 sf of asphalt-reconstruction, and pavement resurfacing; 8 The West-Westmont Drive Neighborhood, with a population of 8,426 residents, is bordered by La Palma Avenue to the north, Harbor Boulevard to the east, Lincoln Boulevard to the south, and Loara Street to SECTION : Resumes
General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture & Landscape Architecture, Geotechnical Engineering/Geology & Material Testing, & Staff Augmentation On-Call Professional Services 7 General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture & Landscape Architecture, Geotechnical Engineering/Geology & Material Testing, & Staff Augmentation On-Call Professional Services 8 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-130-
J5
1;...Joizl \-J’./:J£JE N55 @%9@@
the west. The scope involved 1,795,739 sf of slurry seal, and 756,645 sf of asphalt reconstruction; 9 The Tanglewood Neighborhood is bound by Imperial Highway to the north, Yosemite Drive to the west, Kellog to the east, and Orangethorpe Avenue to the south. The scope included 339,901 sf of asphalt reconstruction, 358,598 sf of slurry seal, and 18,255 sf of sidewalk improvements. In addition, 65 new trees and 30 tree removals were made for the interest of this neighborhood; 10 The Rio Bravo neighborhood is bordered by Camino Manzana, Calle Granada, and Calle Tampico to the north, Eucalyptus Drive to the east, Santa Ana Canyon Road to the south, and Via Cortez to the west. The scope included 306,997 sf of asphalt reconstruction, 294,712 sf of slurry seal, 14,029 sf of sidewalk improvements, 51 new trees and 24 removals; 11 The Academy/Bel Air Neighborhood is bound by Lincoln Avenue to the north, Dale Avenue to the east, Orange Avenue to the south, and Beach Boulevard to the west. The scope included 263,302 sf of asphalt reconstruction, 201,012 sf of slurry seal, 4,256 sf of sidewalk, 30 new trees and 6 removed; 12 The Gaymont/ Elm Lawn Neighborhood is bound by Orange Avenue, Stonybrook Drive, and Ball Road to the north; Dale Avenue, Magnolia Avenue, and Gilbert Street to the east; the Anaheim City Limit to the south; and Beach Boulevard to the west. The scope included 397,521 sf of asphalt reconstruction, 201,012 sf of slurry seal; 12,842 sf of sidewalk, 3,187 lf of curb and gutter, and 71 new trees along with 15 removals; 13 The Greenleaf-Hampton Neighborhood is bound by La Palma Avenue to the north, Gilbert Street to the east, Crescent Avenue to the south, and the Anaheim City Limit to the west. The scope included 1,073,430 sf. of reconstruction, 494 tree trimmings, 15 removals and 75 new trees.
The project limits for phase II were split into three neighborhood areas: 1 The Kings Court Neighborhood is bound by Ball Road to the north, Euclid Street to the east, Katella Avenue to the south, and Brookhurst Street to the west. The scope included 1.1 million sf of grind and cap and 1.1 million sf of slurry seal; 2 The Velare Neighborhood is bound by Orange Avenue to the north, Gilbert Street to the east, Ball Road to the south, and Magnolia Avenue to the west. The scope included 260,677 sf of grind and cap and 327,499 sf of slurry seal; 3 The Sabina Neighborhood is bound by La Palma Avenue to the north, Harbor Boulevard to the east, Sycamore to the south, and the Anaheim Boulevard to the west. The scope included 152,605 sf of grind and cap, 185,494 sf of slurry seal. Coordinating with the local residents was essential on these projects. DATE: 2016-2018
street & slurry seal rehabilitation Project - Phases I, II & III, laguna beach Muhammad provided Public Outreach services for the City of Laguna Beach on Phases I, II, and III of this project. The project limits for Phase I (2017) were split into three areas: Area A (Skyline) included 934,523 sf, Area B (Lower Bluebird Canyon) included 158,057 sf, and Area C (Summit Drive) included 185,961 sf. The project limits for Phase II (2018) covered three different regions: Area A: Canyon Acres Drive/Arroyo Drive/Woodland Drive/Laguna Canyon Frontage Road, Area B: Residential streets in downtown (Loma Terrace, Y Place), and Area C: streets between Thalia Street and Cress Street. The project limits for Phase III (2019) included two areas, Area A: Coast Royal, and Area B: South Laguna Village. These areas are in South Laguna Beach, from the neighborhoods between West Street and 10th Avenue/ Sunset Avenue. The work included variable grind and overlay in some areas, and Type I Slurry Seal in other areas.
There was 2,562 square feet of French Drain that was installed in Area A. A 4-inch drain line was connected to a catch basin in Area A as well. The specifications also called for new traffic signal poles at the Skyline Drive, Crestview Drive, and Fern Street Intersections. Lastly, the project encompassed parkway and curb and gutter improvements, signage and striping. Due to the residential element involved, OE provided Web Maps and a Project Hotline for affected residents, keeping them updated and informed through out the life of the project. DATE: 2017-2020 santa anita active transPortation Program, cycle 5 atP Project,Phase I, II, & III, el monte
Muhammad provided the City of El Monte with Public Outreach services for the Santa Anita Active Transportation Program (ATP) Project, CIP No. 890. This project was funded by LACMTA Net Toll Revenue Reinvestment Grant Fund and Measure M funding, totaling $2,200,000. This project entailed cold-milling and ARHM overlay (nearly 200,000 tons). Additionally, the project included video detection and traffic signal updates, and wayfinding sign and bike rack installation at various intersections. The purpose of this project was to improve safety for all roadway users, improve conditions for non-motorized modes of travel thereby promoting pedestrian, cycle and transit use, improve neighborhood connectivity and livability, and to improve the comfort of non-motorized user traveling to and from the El Monte Transit Center and Downtown El Monte. Work was split into three segments, Class II Bike Lane Installation on Santa Anita Avenue from Tyler Avenue to Lower Azusa Road (0.53 miles), Pavement, Curb and Ramp Upgrades on Tyler Avenue from Ramona Blvd. to Santa Anita Avenue (0.97 miles), and Pavement, Curb and Ramp Upgrades on Ramona Blvd. from Santa Anita Avenue to Tyler Avenue (0.36 miles). DATE: 09/2023 SECTION : Resumes
General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture & Landscape Architecture, Geotechnical Engineering/Geology & Material Testing, & Staff Augmentation On-Call Professional Services 8 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
delfino “cHino” conSunji, pe
construction manager
37 yearS of exPerience2
yearS witH Firm
FielDs oF exPertise:
CALTRANS ASPHALT RETAIN WALL DRAINAGE ROADWAY
qualIFIcatIons
bs: Civil Engineering, University of the Philippines, 1986 • certIFIcate: Engineering Management for Construction, UCLA Extension, 1991 • certIFIcate: Building Construction & Management, AOTS Japan, 1990 • certIFIcate: Inland Navigation & Management, IFIT Belgium, 1989 • Pe #57908 Professional Engineer backgrounD
Delfino “Chino” Consunji is an experienced professional engineer specializing in the design, construction, project management and inspection of buildings, private development and public works projects. Chino’s experience includes working for engineering consultants, contractors, developers, construction management firms and municipal agencies. He has served as City Engineer for the Cities of La Habra, Norwalk, Brea, West Covina and Downey and as Public Works Director for West Covina and Downey. He has managed the design and construction of over 500 projects with a total contract amount of more than $500 million throughout his over 37-year career. These projects included arterial highways and residential streets rehabilitation; intersection widening improvements; traffic signal upgrades, synchronization and safety enhancements; water, sewer, storm drain and NPDES improvements; building and facility improvements; bridge reconstruction and seismic upgrades; and park improvement projects.
Chino is a Registered Professional Engineer (Civil) in the State of California. exPerIence
local streets rehabilitation, Phase II (asPhalt ImProvements) in zone 3, norwalk Chino was the Construction Manager in the City of Norwalk. The limits were bound by the Union Pacific Railroad to the Northwest, the I-5 Freeway to the Northeast, Imperial Highway to the South, and Firestone Boulevard to Southwest.
The project involved cold mill and ARHM overlay, application of slurry seal to the streets, full depth removal including removal and replacement of base material. The project also included installation of continental crosswalks, traffic signage and detector loop replacement. Incidental work involved replacement of traffic related items such as striping and pavement markings. Work was involved at 1 railroad crossing which required some added coordination. DATE:
01/2024
resiDential streets rehabilitation Program, Downey
As Public Works Director/City Engineer on this Residential Streets Rehabilitation Program in service to the City of Downey, Chino oversaw the implementation of the City’s Pavement Management Program (PMP) and 10-year residential streets rehabilitation program. To develop a comprehensive and cost-effective 10-year street improvement program, the City was divided into 10 areas or residential neighborhoods with each year corresponding to rehabilitating a particular area or neighborhood. As directed by the City Council, in order to expedite implementation of the 10-year rehabilitation program and significantly increase the City’s overall network pavement condition index or PCI, Chino worked with the City Manager, Finance Director, financial and municipal bond consultants, and Los Angeles Metropolitan Transportation Authority (Metro) for the issuance and sale of $30 million in Measure M and Measure R Sales Tax Revenue Bonds that were used to fund these street improvements. The $30 million in bond proceeds were required to be expended with three years of bond issuance. Chino was responsible for preparing and sending out the Requests for Proposals (RFP) for the design of the 10 residential neighborhoods; SECTION : Resumes
General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture & Landscape Architecture, Geotechnical Engineering/Geology & Material Testing, & Staff Augmentation On-Call Professional Services 9 General Civil Engineering Design, Construction Management & Inspection, Traffic Engineering, Architecture & Landscape Architecture, Geotechnical Engineering/Geology & Material Testing, & Staff Augmentation On-Call Professional Services 10 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -132-
L)—
$ @ % . @
administering the design contracts; overseeing the bid an d
c
o
n
t
r
a
c
t
a
w
a
r
d
p
r
o
c
e
s
s
a
n
d
o
v
e
r
s
e
e
i
n
g
c
o
n
s
t
r
u
c
t
i
o
n
and inspection of these street improvement projects. The s
e
p
r
o
j
e
c
t
s
w
e
r
e
c
o
m
p
l
e
t
e
d
w
a
y
a
h
e
a
d
o
f
s
c
h
e
d
u
l
e
.
O
v
e
r
a period of 18 months, 600 residential streets or approximat e
l
y
7 0
m
i
l
e
s
o
f
a
s
p
h
a
l
t
p
a
v
e
m
e
n
t
w
e
r
e
r
e
h
a
b
i
l
i
t
a
t
e
d
w
i
t
h
a total cost of $26.5 million. Rehabilitation included recons t
r
u
c
t
i
o
n
,
o
v
e
r
l
a
y
,
c
a
p
e
s
e
a
l
a
n
d
s
l
u
r
r
y
s
e
a
l
o
f
t
h
e
e
x
i
s
t
i
n
g
asphalt pavement. These projects included removal and repl a
c
e
m
e
n
t
o
f
d
a
m
a
g
e
d
a
n
d
/
o
r
u
p
l
i
f
t
e
d
c
o
n
c
r
e
t
e
s
i
d
e
w
a
l
k
s
and curb and gutter and reconstruction of curb access ram p
s
i
n
a
c
c
o
r
d
a
n
c
e
w
i
t
h
c
u
r
r
e
n
t
A
m
e
r
i
c
a
n
s
w
i
t
h
D
i
s
a
b
i
l
i
t
i
e
s
(ADA) requirements. DATE: 2021
transit system (nts) bus stoP ImProvement, Phase I (Fta FunDeD), norwalkChino served as the Construction Manager to the City of Nor w
a
l
k
o
n
t
h
e
B
u
s
S
t
o
p
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
,
P
h
a
s
e
1 .
T
h
e
City’s Transit System was in need of a revamping of the City ’
s
1 6
6 b
u
s
s
t
o
p
s
,
w
i
t
h
a
n
e
w
b
u
s
s
t
o
p
a
d
d
i
t
i
o
n
w
i
t
h
i
n
t
h
e
City of Santa Fe Springs. Each bus stop required a variety o
f
a
n
y
o
n
e
o
f
t
h
e
f
o
l
l
o
w
i
n
g
u
p
g
r
a
d
e
s
:
s
o
l
a
r
p
o
w
e
r
e
q
u
i
p
t
shelters; seating; trash receptacles; and signs built for re a
l
-
t
i
m
e
p
o
s
t
i
n
g
.
O
E
w
a
s
t
a
s
k
e
d
w
i
t
h
s
i
g
n
a
g
e
i
n
s
t
a
l
l
a
t
i
o
n
at 73 of the City’s bus stops along Routes 1 and 4, alo n
g
w
i
t
h
u
p
g
r
a
d
i
n
g
a
f
u
r
t
h
e
r
9 s
t
o
p
s
.
O
E
p
r
o
v
i
d
e
d
P
E
S
/
Environmental preparations, base map and maintenance pla n
d
e
v
e
l
o
p
m
e
n
t
,
c
o
n
c
e
p
t
p
l
a
n
s
f
o
r
b
u
s
s
t
o
p
s
,
a
s
w
e
l
l
a
s
a
thorough field survey of all of the bus stops which included t
h
e
u
s
e
o
f
d
r
o
n
e
s
u
r
v
e
y
i
n
g
.
O
E
’
s
c
o
n
t
r
i
b
u
t
i
o
n
r
e
q
u
i
r
e
d
6 0
working days out of the project’s duration of approximately 1 8
m
o
n
t
h
s
f
r
o
m
t
h
e
n
o
t
i
c
e
t
o
p
r
o
c
e
e
d
,
w
i
t
h
a
n
e
s
t
i
m
a
t
e
d
total project cost of $1.5 million, funded by the Federal Trans i
t
A
d
m
i
n
i
s
t
r
a
t
i
o
n
(
F
T
A
)
.
DATE: ActiveFy 2023-24 Pavement management Program ImPlementation Project, glenDaleChino served as the Project Manager to the City of Glendal e
o
n
t
h
e
F
i
s
c
a
l
Y
e
a
r
2 0
2 3
t
o
2 0
2 4
P
a
v
e
m
e
n
t
M
a
n
a
g
e
m
e
n
t
Program Implementation Project. The purpose of this proje c
t
w
a
s
t
o
r
e
h
a
b
i
l
i
t
a
t
e
a
p
p
r
o
x
i
m
a
t
e
l
y
4 8
,
6 5
0 l
i
n
e
a
r
f
e
e
t
(9.2 miles) of street, a total of 60 streets in all. OE was task e
d
w
i
t
h
p
r
o
v
i
d
i
n
g
d
e
s
i
g
n
s
f
o
r
p
a
v
e
m
e
n
t
r
e
s
u
r
f
a
c
i
n
g
a
n
d
reconstruction; curb, gutter and sidewalk repairs at 9 separa t
e
l
o
c
a
t
i
o
n
s
;
a
t
o
t
a
l
o
f
1 2
4 A
D
A
c
u
r
b
r
a
m
p
s
a
n
d
d
r
i
v
e
w
a
y
s
construction; catch basin enhancements; bus stop impro
v
e
m
e
n
t
s
a
n
d
r
e
l
o
c
a
t
i
o
n
s
;
s
e
w
e
r
p
o
i
n
t
r
e
p
a
i
r
s
;
t
r
e
e
w
e
l
l
installation and tree planting; utility appurtenance adjustm e
n
t
s
a
n
d
r
e
l
o
c
a
t
i
o
n
s
;
s
i
g
n
i
n
g
a
n
d
s
t
r
i
p
i
n
g
;
a
n
d
s
u
r
v
e
y
i
n
g
well monument installations and replacements. Additional w
o
r
k
i
n
c
l
u
d
e
d
s
e
w
e
r
v
i
d
e
o
i
n
s
p
e
c
t
i
o
n
t
o
i
d
e
n
t
i
f
y
s
e
w
e
r
defects and preparing sanitary sewer plans for repairs that
i
n
c
l
u
d
e
d
p
o
i
n
t
r
e
p
a
i
r
s
,
a
n
d
s
e
c
t
i
o
n
a
l
a
n
d
f
u
l
l
-
l
e
n
g
t
h
s
l
i
p
lining, along with Traffic Control plans. OE also acquired no-f e
e
p
e
r
m
i
t
s
f
o
r
g
r
o
u
n
d
d
i
s
t
r
u
b
a
n
c
e
w
o
r
k
w
i
t
h
i
n
t
h
e
C
i
t
y
’
s
right-of-way. DATE: 2024
sierra vista Drive (west) & Del norte avenue (north) Project, chino hillsChino served as the Project Manager to the City of Chino H
i
l
l
s
f
o
r
t
h
e
S
i
e
r
r
a
V
i
s
t
a
D
r
i
v
e
(
W
e
s
t
)
&
D
e
l
N
o
r
t
e
A
v
e
n
u
e
(North) Project. The purpose of the project is to rehabilita t
e
p
a
v
e
m
e
n
t
a
n
d
i
n
s
t
a
l
l
n
e
w
c
u
r
b
,
g
u
t
t
e
r
,
a
n
d
s
i
d
e
w
a
l
k
along approximately 650 linear feet (0.12 miles) of Sierr a
V
i
s
t
a
D
r
i
v
e
b
e
t
w
e
e
n
P
i
p
e
l
i
n
e
A
v
e
n
u
e
a
n
d
D
e
l
N
o
r
t
e
Avenue and approximately 350 feet (0.07 miles) of Del Nor t
e
A
v
e
n
u
e
f
r
o
m
G
i
r
d
A
v
e
n
u
e
t
o
L
u
g
o
A
v
e
n
u
e
.
C
o
n
c
r
e
t
e
infrastructure improvements were limited to the south si d
e
o
f
S
i
e
r
r
a
V
i
s
t
a
D
r
i
v
e
a
n
d
t
h
e
e
a
s
t
s
i
d
e
o
f
D
e
l
N
o
r
t
e
Avenue. The streets included very minimal existing curb, gu t
t
e
r
,
a
n
d
s
i
d
e
w
a
l
k
.
DATE: 2021Fy2019/2020 resiDential streets rehabilitation, DowneyAs Public Works Director/City Engineer, Chino oversaw the d
e
s
i
g
n
,
b
i
d
a
n
d
c
o
n
t
r
a
c
t
a
w
a
r
d
p
r
o
c
e
s
s
,
c
o
n
s
t
r
u
c
t
i
o
n
a
n
d
inspection of this project. This project rehabilitated 35 resid e
n
t
i
a
l
s
t
r
e
e
t
s
o
r
a
p
p
r
o
x
i
m
a
t
e
l
y
7 m
i
l
e
s
o
f
e
x
i
s
t
i
n
g
a
s
p
h
a
l
t
pavement in the south half of the City with a total cost of $2.8 m
i
l
l
i
o
n
.
R
e
h
a
b
i
l
i
t
a
t
i
o
n
i
n
c
l
u
d
e
d
r
e
c
o
n
s
t
r
u
c
t
i
o
n
a
n
d
o
v
e
r
l
a
y
o
f
the existing asphalt pavement. This project also included rem o
v
a
l
a
n
d
r
e
p
l
a
c
e
m
e
n
t
o
f
d
a
m
a
g
e
d
a
n
d
/
o
r
u
p
l
i
f
t
e
d
c
o
n
c
r
e
t
e
sidewalks and curb and gutter and reconstruction of curb
a
c
c
e
s
s
r
a
m
p
s
i
n
a
c
c
o
r
d
a
n
c
e
w
i
t
h
c
u
r
r
e
n
t
A
D
A
s
t
a
n
d
a
r
d
s
.
Funding for this project came from Measure R, Senate Bill 1, Ve h
i
c
l
e
I
m
p
a
c
t
F
e
e
s
a
n
d
D
e
v
e
l
o
p
e
r
F
u
n
d
s
.
DATE: 2020cameron avenue sewer main rehabilitation, west covinaChino managed the design, bid and contract award proces s
,
c
o
n
s
t
r
u
c
t
i
o
n
a
n
d
i
n
s
p
e
c
t
i
o
n
o
f
t
h
e
C
a
m
e
r
o
n
A
v
e
n
u
e
Sewer Main Rehabilitation. This project replaced approxi m
a
t
e
l
y
2 ,
0 0
0 l
i
n
e
a
r
f
e
e
t
o
f
e
x
i
s
t
i
n
g
1 0
-
i
n
c
h
s
e
w
e
r
m
a
i
n
on Cameron Avenue from Citrus Street to 750 feet east o f
I
n
m
a
n
A
v
e
n
u
e
w
i
t
h
a
1 4
-
i
n
c
h
h
i
g
h
d
e
n
s
i
t
y
p
o
l
y
e
t
h
y
l
e
n
e
(HDPE) pipe. The project also replaced existing sewer man h
o
l
e
s
,
a
d
j
u
s
t
e
d
s
e
w
e
r
l
a
t
e
r
a
l
s
a
n
d
a
p
p
u
r
t
e
n
a
n
t
w
o
r
k
.
T
o
expedite construction and minimize inconvenience to mot o
r
i
s
t
s
a
n
d
s
c
h
o
o
l
c
o
m
m
u
t
e
r
s
,
t
h
e
n
e
w
1 4
-
i
n
c
h
H
D
P
E
p
i
p
e
was installed by pipe bursting method. Project cost was $8 0 0
,
0 0
0 w
i
t
h
f
u
n
d
i
n
g
c
o
m
i
n
g
f
r
o
m
S
e
w
e
r
E
n
t
e
r
p
r
i
s
e
F
u
n
d
.
DATE: 2021
SECTION : Resumes
General Civil Engineering Design, Construction Managem
e
n
t
&
I
n
s
p
e
c
t
i
o
n
,
T
r
a
f
f
i
c
Engineering, Architecture & Landscape Architecture, Geotec h
n
i
c
a
l
E
n
g
i
n
e
e
r
i
n
g
/
G
e
o
l
o
g
y
& Material Testing, & Staff Augmentation On-Call Professional S
e
r
v
i
c
e
s
10 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
J
, L
raSH id “raSH ” Syed
Project/construction manager
35 yearS of exPerience9
yearS witH Firm
FielDs oF exPertise:
ROADWAY
ASPHALT
PAVEMENT
CALTRANS
WIDENING
qualIFIcatIons
bs: Civil Engineering, Hyderabad Polytechnic Institute • ba: Public Administration, California State University, Long Beach • m Pa : Public Administration, California State University, Long Beach backgrounD
Rash possesses over 35 years of solid experience in the public works sector. Rash has a wide range of experience on a variety of projects requiring inspection. As an Associate Engineer, he provided public agencies with tasks including design engineering, plan preparation, specification preparation, plan-checking services, inspection services, Construction Management and support, peer review, stakeholder coordination, public outreach, and staff support. Rash has successfully taken multiple projects from the initial Federal funding application, to the Preliminary Environmental Study, to E-76 approval, and all the way through construction of audited Federally Funded construction projects. Through his long- term experience, he has become proactive in identifying potential obstacles before they occur. exPerIence
The following projects were completed by Rash when he was assigned as Inspector in the City of Cerritos between 6/1989 and 1/2011.
Flora vista Dog Park, bellFlower
Rash provided inspection services on the Flora Vista Dog Park for the City of Bellflower. The park is located along the Bellflower bike trail and pedestrian path at the cul-de-sac on Flora Vista Street. The dog park offers an off-leash play area for large and small dogs and both areas are stationed with dog waste dispenser receptacles. The roaming area is bedded with decomposed granite which is a safe and sanitary option used commonly in community parks.
The park entails special features which include: a custom drinking fountain for owners and dogs, drought tolerant landscaping and a dog bone shaped planter which doubles as seating. The scope of work involved installing fencing excavation, removal and replacement of PCC driveways, ramps, curb and gutter, and the construction of DG footpath and a sidewalk with decorative paw prints. Furthermore, the project entailed landscaping. annual street rehabilitation Projects - sltPP FunDeD, cerritos Rash was the inspector on the City’s annual roadway rehabilitation project for six years totaling $3.4 million in maintenance. The work included AC overlay of several Citywide Arterial Streets, and Type I, Type II Slurry Seal, and ARAM application of residential and collector streets. The projects were funded by SLTPP funds and required Caltrans compliance. The work required heavy coordination with residents and businesses, utility work and relocations, and careful management of funds.
artesia boulevarD reconstruction-Phases I & II, cerrItos Rash served as inspector on phases I and II on the Artesia Boulevard Reconstruction Project. The project limits for Phase I were from Carmenita Road to Valley View Avenue. The scope of the work included removing and replacing damaged asphalt pavement, removing and replacing the damaged curb and gutter, and grind and overlay of the existing street. The project also required traffic striping and traffic control. This was federally funded project with an approximate construction cost of $530,000. Rash managed meetings with Caltrans, meeting the federal and DBA requirements, securing federal funds, certified payrolls, and having the project audited. The project limits for Phase II were located from Clarkdale Avenue to Norwalk Boulevard. This project was a multi-agency project with the City
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-134-
wwé$0$®
of Artesia. It was fully funded by the City of Cerritos, but th e
w
e
s
t
e
r
l
y
b
o
u
n
d
a
r
y
j
o
i
n
e
d
w
i
t
h
t
h
e
C
i
t
y
o
f
A
r
t
e
s
i
a
.
R
a
s
h
worked with the City of Artesia from beginning till end to ob t
a
i
n
a
p
p
r
o
v
a
l
.
T
h
e
s
c
o
p
e
o
f
t
h
e
w
o
r
k
i
n
c
l
u
d
e
d
g
r
i
n
d
a
n
d
overlay.
carmenita roaD reconstruction - Phases I & II, cerrItosRash served as inspector on phases I and II on the Carme n
i
t
a
R
o
a
d
R
e
c
o
n
s
t
r
u
c
t
i
o
n
P
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
l
i
m
i
t
s
f
o
r
Phase I were from Artesia Boulevard to Alondra Boulevard.
T
h
e
s
c
o
p
e
o
f
t
h
e
w
o
r
k
i
n
c
l
u
d
e
d
r
e
m
o
v
i
n
g
a
n
d
r
e
p
l
a
c
i
n
g
damaged asphalt pavement, removing and replacing the d
a
m
a
g
e
d
c
u
r
b
a
n
d
g
u
t
t
e
r
,
a
n
d
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
o
f
t
h
e
existing street. The project also required traffic striping an d
t
r
a
f
f
i
c
c
o
n
t
r
o
l
.
T
h
e
a
p
p
r
o
x
i
m
a
t
e
c
o
n
s
t
r
u
c
t
i
o
n
c
o
s
t
w
a
s
$529,000. The project limits for Phase II were from Artesia Bo u
l
e
v
a
r
d
t
o
S
o
u
t
h
S
t
r
e
e
t
.
T
h
i
s
s
t
r
e
e
t
h
a
d
e
x
i
s
t
i
n
g
m
e
d
i
a
n
islands. The median curb was uplifted. The scope of the w o
r
k
i
n
c
l
u
d
e
d
r
e
m
o
v
i
n
g
a
n
d
r
e
p
l
a
c
i
n
g
t
h
e
u
p
l
i
f
t
e
d
m
e
d
i
a
n
curb, damaged asphalt pavement, removing and replacing t h
e
d
a
m
a
g
e
d
c
u
r
b
a
n
d
g
u
t
t
e
r
,
a
n
d
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
o
f
t
h
e
existing street. The project also required traffic striping and t
r
a
f
f
i
c
c
o
n
t
r
o
l
.
R
a
s
h
w
a
s
a
l
s
o
m
a
n
a
g
i
n
g
t
h
e
d
e
s
i
g
n
p
h
a
s
e
of the project, including project design review during the d e
s
i
g
n
p
h
a
s
e
.
PIuma avenue reconstruction - Phase II, cerritosRash served as inspector for this $200,000 project with lim i
t
s
o
n
P
i
u
m
a
A
v
e
n
u
e
f
r
o
m
A
l
o
n
d
r
a
B
o
u
l
e
v
a
r
d
t
o
t
h
e
G
o
l
f
Course. Rash designed this project in house with the hel p
o
f
t
h
e
C
i
t
y
s
t
a
f
f
.
T
h
e
s
c
o
p
e
o
f
t
h
e
w
o
r
k
i
n
c
l
u
d
i
n
g
f
u
l
l
reconstruction to repair the deteriorated roadway. Parkway i m
p
r
o
v
e
m
e
n
t
s
w
e
r
e
a
l
s
o
m
a
d
e
a
s
p
a
r
t
o
f
t
h
i
s
p
r
o
j
e
c
t
.
cerritos Park east imProvements, cerritosRash provided inspection services on the Cerritos Park East m
a
d
e
u
p
o
f
3 2
a
c
r
e
s
.
T
h
e
p
a
r
k
w
a
s
s
p
l
i
t
i
n
t
o
t
w
o
d
i
f
f
e
r
e
n
t
parts: the community center and the outdoor facilities. Th e
c
o
m
m
u
n
i
t
y
c
e
n
t
e
r
i
n
c
l
u
d
e
d
a
6 ,
5 7
8 S
F
m
u
l
t
i
-
p
u
r
p
o
s
e
room, an activity room, dance room, game room, and large c
a
t
e
r
i
n
g
k
i
t
c
h
e
n
w
i
t
h
a
s
m
a
l
l
e
r
c
o
m
m
u
n
i
t
y
k
i
t
c
h
e
n
.
T
h
e
outdoor facilities included 3 baseball diamonds, 2 basket b
a
l
l
c
o
u
r
t
s
,
4 h
a
n
d
b
a
l
l
c
o
u
r
t
s
,
a
n
d
3 5
7 y
a
r
d
s
o
f
j
o
g
g
i
n
g
track, 4 tennis courts, and playground equipment. The facil i
t
i
e
s
a
l
s
o
i
n
c
l
u
d
e
d
a
s
p
r
a
y
p
o
o
l
,
3 p
i
c
n
i
c
s
h
e
l
t
e
r
s
,
p
i
c
n
i
c
tables, restroom, parking areas, and a snack bar. Further m
o
r
e
,
R
a
s
h
w
a
s
r
e
s
p
o
n
s
i
b
l
e
f
o
r
m
a
k
i
n
g
i
m
p
r
o
v
e
m
e
n
t
s
t
o
the park’s facilities, installing safety lights throughout the p a
r
k
,
i
n
s
t
a
l
l
i
n
g
n
e
w
p
l
a
y
g
r
o
u
n
d
e
q
u
i
p
m
e
n
t
,
i
m
p
r
o
v
i
n
g
t
h
e
playground, and making improvements to the athletic court s
/
f
i
e
l
d
s
.
195th street reconstruction, cerritosRash served as inspector for this project on 195th Street from Studebaker Road to Pioneer Boulevard. This p r
o
j
e
c
t
included constructing a median island, installation of reclai m
e
d
w
a
t
e
r
l
i
n
e
,
p
l
a
n
t
i
n
g
o
f
t
r
e
e
s
,
a
n
d
p
r
o
v
i
d
i
n
g
p
o
w
e
r
t
o
the sprinkler system. Because of the location of the project,
t
h
e
c
o
m
m
u
n
i
t
y
w
a
s
n
o
t
i
f
i
e
d
a
n
d
r
e
c
e
i
v
e
d
a
p
p
r
o
v
a
l
o
f
t
h
e
residents.
Downtown PeDestrian ImProvement Project - t-115, torranceRash served as inspector to the City of Torrance on this Do w
n
t
o
w
n
P
e
d
e
s
t
r
i
a
n
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
.
T
h
e
D
o
w
n
t
o
w
n
Pedestrian Improvement Project seeks to provide a more a t
t
r
a
c
t
i
v
e
p
e
d
e
s
t
r
i
a
n
e
n
v
i
r
o
n
m
e
n
t
a
l
o
n
g
C
r
a
v
e
n
s
A
v
e
n
u
e
from Carson Street to Torrance Boulevard. The work encom p
a
s
s
e
d
t
h
e
c
o
n
s
t
r
u
c
t
i
o
n
o
f
a
u
n
i
f
o
r
m
,
s
p
a
c
i
o
u
s
,
a
n
d
A
D
A
-
compliant sidewalks, new decorative LED street lights, impr o
v
e
d
l
a
n
d
s
c
a
p
i
n
g
,
r
o
a
d
w
a
y
p
a
v
e
m
e
n
t
r
e
h
a
b
i
l
i
t
a
t
i
o
n
,
n
e
w
curb and gutter, benches, bike racks, and pedestrian signa g
e
.
T
h
e
w
a
t
e
r
m
a
i
n
l
i
n
e
l
o
c
a
t
e
d
u
n
d
e
r
t
h
e
s
i
d
e
w
a
l
k
w
a
s
relocated under the roadway to provide improved access f o
r
f
u
t
u
r
e
r
e
p
a
i
r
w
o
r
k
.
T
h
e
w
o
r
k
a
l
s
o
i
n
c
l
u
d
e
d
r
e
p
l
a
c
e
m
e
n
t
of the sidewalk, curb and gutter, and curb ramps, roadway r e
p
a
i
r
a
n
d
r
e
p
l
a
c
e
m
e
n
t
o
f
t
r
a
f
f
i
c
s
i
g
n
s
.
DATE: 2018street & slurry seal rehabilitation - Phase II, laguna beachRash provided inspection services for the City of Laguna B e
a
c
h
o
n
P
h
a
s
e
I
I
o
f
t
h
i
s
p
r
o
j
e
c
t
c
o
v
e
r
i
n
g
t
h
r
e
e
p
h
a
s
e
s
i
n
three years. The project limits covered three different regi o
n
s
-
A
r
e
a
A
:
C
a
n
y
o
n
A
c
r
e
s
D
r
i
v
e
/
A
r
r
o
y
o
D
r
i
v
e
/
W
o
o
d
l
a
n
d
Drive/Laguna Canyon Frontage Road, Area B: Residential
s
t
r
e
e
t
s
i
n
d
o
w
n
t
o
w
n
(
L
o
m
a
T
e
r
r
a
c
e
,
Y
P
l
a
c
e
)
,
a
n
d
A
r
e
a
C: streets between Thalia Street and Cress Street. The w o
r
k
i
n
c
l
u
d
e
d
v
a
r
i
a
b
l
e
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
i
n
s
o
m
e
a
r
e
a
s
,
and Type I Slurry Seal in other areas. The specifications al s
o
c
a
l
l
e
d
f
o
r
n
e
w
t
r
a
f
f
i
c
s
i
g
n
a
l
p
o
l
e
s
.
L
a
s
t
l
y
,
t
h
e
p
r
o
j
e
c
t
encompassed parkway and curb and gutter improvemen
t
s
,
s
i
g
n
a
g
e
a
n
d
s
t
r
i
p
i
n
g
.
D
u
e
t
o
t
h
e
r
e
s
i
d
e
n
t
i
a
l
e
l
e
m
e
n
t
involved, OE provided an up-to-date informative Web Page, i
n
t
e
r
a
c
t
i
v
e
W
e
b
M
a
p
s
a
n
d
a
P
r
o
j
e
c
t
H
o
t
l
i
n
e
f
o
r
a
f
f
e
c
t
e
d
residents, keeping them updated and informed through-out
t
h
e
l
i
f
e
o
f
t
h
e
p
r
o
j
e
c
t
.
DATE: 2018
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
J
, L
ludy SmeetS, pe
construction manager
39 yearS of exPerience12
yearS witH Firm
FielDs oF exPertise:
ROADWAY
ASPHALT
CONCRETE
PARK
RESIDENTIAL
qualIFIcatIons
Pe #37221: Registered Civil Engineer • bs: Civil Engineering, CSULB, 1979 • us army: Command & General Staff College, 1989 • ma: Military Science, A&M, 1990 • aPwa member: American Public Works Association asce member: American Society of Civil Engineers • nsPe member: National Society Professional Engineers same member: Society of American Military Engineers
backgrounD
Ludy has over 39 years of civil engineering experience with focus on Project Management and Construction Management. He also has experience in the design of civil engineering projects such as street, sewer, water, and storm drain projects. Ludy has management level experience working in public works departments in cities throughout Southern California. His experience includes public agency budgeting, project implementation, project design, PS&E development, contract bidding, award administration, construction management and project closure reporting. He has selected, directed and managed consultants, architects and engineers as required in order to meet public works department goals and objectives. He has supervised and trained city staff junior engineers. His many responsibilities included providing project management for federally funded projects, and state funded projects. exPerIence
merceD avenue lInear Park Project (cIP 003), el monte
Ludy provided Construction Management services to the City of El Monte on the Merced Avenue Linear Park Project, CIP 003, located on Merced Avenue between Garvey Avenue and Towneway Drive. The improvements consisted of constructing a 1.1-acre linear park within the existing roadway to provide traffic calming through lane reduction, tree planting, seating, picnic areas, play and fitness equipment, sidewalk, planting areas, protective fencing, solar lighting, trash receptacles, bike racks, stormwater retention areas, and all other work as indicated in the construction documents. Replacement of existing 6” and 8” water mainline along the east side of Merced Avenue was also included as part of this project. Additionally, OE provided public outreach support on the project. The Project was funded through the Clean California Grant Funds and Local Funds. DATE: 01/2023-11/2024 neIghborhooD Park renovatIons - cherry Park Project, lake Forest Ludy provided Construction Management and inspection services to the City of Lake Forest on this neighborhood park located on Cherry Avenue, bound by Jeronimo Road to the west, Trabuco Road to the east, Los Alisos Boulevard to the south, and El Toro Road to the north. The work entails grading, landscaping, irrigation, site furnishings, a redesigned play area with resilient surfacing, new playground equipment, and a shade structure. DATE: 2020 arroyo DrIve ImProvement Project, montebello
Ludy supplied Construction Management services to the City of Montebello on the Arroyo Drive Improvement Project.
The project limits are on Arroyo Drive from Astra Drive to Glen Avenue. This project includes pavement rehabilitation, ADA ramp, curb and gutter, and driveway repairs, storm drain improvements, and associated improvements. The budget for this project is $1,239,085 made up of STPL Funds ($1,063,000) Measure R ($146,045) and Prop C ($30,040) funds, and full compliance with all applicable requirements was essential. The project limits on the north side
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-136-
‘ \
I...“ a; EAHSJ'JE NC:
J:
l--.:- .1; II. r. 1'. '11]
are adjacent to the back-lot of St. Joseph’s Salesian Yo u
t
h
R
e
t
r
e
a
t
C
e
n
t
e
r
a
n
d
D
o
n
B
o
s
c
o
T
e
c
h
n
i
c
a
l
I
n
s
t
i
t
u
t
e
.
Coordination for parking access was vital. The Astra Drive n e
i
g
h
b
o
r
h
o
o
d
(
c
u
l
-
d
e
-
s
a
c
)
a
n
d
P
o
t
r
e
r
o
H
e
i
g
h
t
s
P
a
r
k
a
n
d
Community & Senior Center at the west end of the project li m
i
t
s
a
l
s
o
r
e
q
u
i
r
e
d
c
o
o
r
d
i
n
a
t
i
o
n
,
s
i
n
c
e
t
h
e
p
a
r
k
i
n
g
l
o
t
a
n
d
residential neighborhoods can only be accessed from Arroy o
D
r
i
v
e
.
DATE: 2021
mauna loa ave. resIDentIal street ImProvements & water maIn InstallatIon Project, glenDoraLudy provided Construction Management services to the C
i
t
y
o
f
G
l
e
n
d
o
r
a
o
n
t
h
e
M
a
u
n
a
L
o
a
A
v
e
n
u
e
W
a
t
e
r
M
a
i
n
Installation and Street Improvements Project. This project c
o
n
s
i
s
t
e
d
o
f
i
n
s
t
a
l
l
i
n
g
6 ,
4 0
0 L
F
o
f
n
e
w
8 -
i
n
.
w
a
t
e
r
m
a
i
n
and 194,000 SF of street improvements that included pavem e
n
t
r
e
h
a
b
i
l
i
t
a
t
i
o
n
o
f
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
,
c
o
n
c
r
e
t
e
s
i
d
e
w
a
l
k
repairs, curb and gutter repairs, repairing 11 ADA non-compl i
a
n
t
c
u
r
b
r
a
m
p
s
,
t
r
a
f
f
i
c
s
i
g
n
a
l
l
o
o
p
r
e
p
l
a
c
e
m
e
n
t
,
s
i
g
n
i
n
g
,
and striping for a total of 100 working days. The project was l o
c
a
t
e
d
a
l
o
n
g
3 s
t
r
e
e
t
s
o
f
f
G
l
e
n
d
o
r
a
A
v
e
n
u
e
-
M
a
u
n
a
L
o
a
Avenue, Duell Street, and Linfield Street, as well as Minnes o
t
a
A
v
e
n
u
e
.
DATE: 2023local streets rehabIlItatIon Phase I (concrete ImProvements) zone 3, norwalkLudy provided Construction Management services on the L
o
c
a
l
S
t
r
e
e
t
s
R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
g
r
a
m
P
h
a
s
e
I
(
C
o
n
c
r
e
t
e
Improvements) in Zone 3, which is bound by the Union P
a
c
i
f
i
c
R
a
i
l
r
o
a
d
t
o
t
h
e
N
o
r
t
h
w
e
s
t
,
t
h
e
I
-
5 F
r
e
e
w
a
y
t
o
t
h
e
Northeast, Imperial Highway to the South, and Firestone Bo u
l
e
v
a
r
d
t
o
S
o
u
t
h
w
e
s
t
.
T
h
e
p
r
o
j
e
c
t
i
n
v
o
l
v
e
d
r
e
m
o
v
a
l
a
n
d
replacement of sidewalk (3,000 SF); curb and gutter (2,600 L
F
)
;
n
e
w
a
n
d
r
e
p
l
a
c
e
m
e
n
t
A
D
A
c
u
r
b
r
a
m
p
s
(
9 3
r
a
m
p
s
a
n
d
10 truncated domes); driveway approach repairs (500 SF); c r
o
s
s
g
u
t
t
e
r
r
e
p
l
a
c
e
m
e
n
t
s
(
2 9
l
o
c
a
t
i
o
n
s
w
i
t
h
a
s
s
o
c
i
a
t
e
d
curb ramps); including incidental asphalt work, utility relocat i
o
n
s
a
n
d
t
r
a
f
f
i
c
c
o
n
t
r
o
l
.
DATE: 09/2022-11/2022at&t utIlIty Project, hermosa beachLudy provided Construction Management services to the C
i
t
y
o
f
H
e
r
m
o
s
a
B
e
a
c
h
o
n
t
h
i
s
t
h
r
e
e
-
p
h
a
s
e
A
T
&
T
U
t
i
l
i
t
y
Project. The work entailed installation of fiber cable relate d
t
o
f
u
t
u
r
e
s
m
a
l
l
c
e
l
l
f
a
c
i
l
i
t
i
e
s
p
r
o
p
o
s
e
d
b
y
A
T
&
T
.
P
h
a
s
e
1 included 2,573 linear feet of trenching, Phase 2 including 1 ,
6 6
6 l
i
n
e
a
r
f
e
e
t
o
f
t
r
e
n
c
h
i
n
g
,
a
n
d
P
h
a
s
e
3 i
n
c
l
u
d
e
d
1 ,
1 4
6 linear feet of trenching. DATE: 2023
sketchers 2901 anD tunnel Project, hermosa beachLudy provided Construction Management services on this
p
r
o
j
e
c
t
t
o
c
o
n
s
t
r
u
c
t
a
s
u
b
t
e
r
r
a
n
e
a
n
p
e
d
e
s
t
r
i
a
n
t
u
n
n
e
l
connecting the 2901 PCH Building and the 3001 PCH Buildin g
c
u
r
r
e
n
t
l
y
u
n
d
e
r
c
o
n
s
t
r
u
c
t
i
o
n
a
s
a
l
a
r
g
e
r
d
e
v
e
l
o
p
m
e
n
t
project within the City for Hermosa Beach. The tunnel runs a c
r
o
s
s
3 0
t
h
S
t
r
e
e
t
.
DATE: 2023street & slurry seal rehabIlItatIon - Phase III, laguna beachLudy lent his skills in providing full Construction Ma n
a
g
e
m
e
n
t
a
n
d
I
n
s
p
e
c
t
i
o
n
S
e
r
v
i
c
e
s
f
o
r
t
h
e
C
i
t
y
o
f
Laguna Beach on Phase III of the Street and Slurry Seal R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
,
T
h
e
p
r
o
j
e
c
t
c
o
v
e
r
e
d
t
h
e
s
p
a
n
o
f
three phases in three years. The project limits for Phase III ( 2 0
1 9
)
i
n
c
l
u
d
e
s
t
w
o
a
r
e
a
s
:
A
r
e
a
A
-
C
o
a
s
t
R
o
y
a
l
,
a
n
d
A
r
e
a
B-South Laguna Village. These areas are in South Laguna
B
e
a
c
h
,
f
r
o
m
t
h
e
n
e
i
g
h
b
o
r
h
o
o
d
s
b
e
t
w
e
e
n
W
e
s
t
S
t
r
e
e
t
and 10th Avenue/Sunset Avenue. The work included vari
a
b
l
e
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
i
n
s
o
m
e
a
r
e
a
s
,
a
n
d
T
y
p
e
I
S
l
u
r
r
y
Seal in other areas. The specifications also called for ne w
t
r
a
f
f
i
c
s
i
g
n
a
l
p
o
l
e
s
.
L
a
s
t
l
y
,
t
h
e
p
r
o
j
e
c
t
e
n
c
o
m
p
a
s
s
e
d
parkway and curb and gutter improvements, and signag
e
a
n
d
s
t
r
i
p
i
n
g
.
D
u
e
t
o
t
h
e
r
e
s
i
d
e
n
t
i
a
l
e
l
e
m
e
n
t
i
n
v
o
l
v
e
d
,
OE provided an up-to-date informative Web Page, interactiv e
W
e
b
M
a
p
s
a
n
d
a
P
r
o
j
e
c
t
H
o
t
l
i
n
e
f
o
r
a
f
f
e
c
t
e
d
r
e
s
i
d
e
n
t
s
,
keeping them updated and informed through-out the life of t
h
e
p
r
o
j
e
c
t
.
DATE: 2020
santa anIta actIve transPortatIon Program cycle 5 Project, el monteLudy provided the City of El Monte with Inspection Services
f
o
r
t
h
e
S
a
n
t
a
A
n
i
t
a
A
c
t
i
v
e
T
r
a
n
s
p
o
r
t
a
t
i
o
n
P
r
o
g
r
a
m
(
A
T
P
)
Project, CIP No. 890. This project was funded by LACMTA Ne t
T
o
l
l
R
e
v
e
n
u
e
R
e
i
n
v
e
s
t
m
e
n
t
G
r
a
n
t
F
u
n
d
a
n
d
M
e
a
s
u
r
e
M
funding, totaling $2,200,000. This project entailed cold-milli n
g
a
n
d
A
R
H
M
o
v
e
r
l
a
y
(
n
e
a
r
l
y
2 0
0 ,
0 0
0 t
o
n
s
)
.
A
d
d
i
t
i
o
n
a
l
l
y
,
the project included video detection and traffic signal updat e
s
,
a
n
d
w
a
y
f
i
n
d
i
n
g
s
i
g
n
a
n
d
b
i
k
e
r
a
c
k
i
n
s
t
a
l
l
a
t
i
o
n
a
t
v
a
r
i
o
u
s
intersections. The purpose of this project was to improve s a
f
e
t
y
f
o
r
a
l
l
r
o
a
d
w
a
y
u
s
e
r
s
,
i
m
p
r
o
v
e
c
o
n
d
i
t
i
o
n
s
f
o
r
n
o
n
-
motorized modes of travel thereby promoting pedestrian, cy c
l
e
a
n
d
t
r
a
n
s
i
t
u
s
e
,
i
m
p
r
o
v
e
n
e
i
g
h
b
o
r
h
o
o
d
c
o
n
n
e
c
t
i
v
i
t
y
and livability, and to improve the comfort of non-motorized u s
e
r
t
r
a
v
e
l
i
n
g
t
o
a
n
d
f
r
o
m
t
h
e
E
l
M
o
n
t
e
T
r
a
n
s
i
t
C
e
n
t
e
r
a
n
d
Downtown El Monte. Work was split into three segments, Cla s
s
I
I
B
i
k
e
L
a
n
e
I
n
s
t
a
l
l
a
t
i
o
n
o
n
S
a
n
t
a
A
n
i
t
a
A
v
e
n
u
e
f
r
o
m
T
y
l
e
r
Avenue to Lower Azusa Road (0.53 miles), Pavement, Curb a n
d
R
a
m
p
U
p
g
r
a
d
e
s
o
n
T
y
l
e
r
A
v
e
n
u
e
f
r
o
m
R
a
m
o
n
a
B
l
v
d
.
t
o
Santa Anita Avenue (0.97 miles), and Pavement, Curb and Ra m
p
U
p
g
r
a
d
e
s
o
n
R
a
m
o
n
a
B
l
v
d
.
f
r
o
m
S
a
n
t
a
A
n
i
t
a
A
v
e
n
u
e
t
o
Tyler Avenue (0.36 miles). DATE: 09/2023
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
J
, L
juStin SmeetS, pe, plS, qSp
construction manager
19 yearS of exPerience12
yearS witH Firm
FielDs oF exPertise:
WIDENING WATER SEWER DRAINAGE ROADWAY
qualIFIcatIons
Pe #78314: Registered Civil Engineer•Pls #9293: Professional Land Surveyor • qsD/qsP #00852: Qualified SWPPP Developer•bs: Civil Engineering, California State University, Fullerton, 2007•octa certiFication (prior) Pavement Evaluation & Recommendations
backgrounD
Justin wields 18 years of experience involving civil engineering design, municipal engineering and facilities design, construction management and construction administration. Using AutoCAD Civil 3D, Justin handles the management and development of engineering plans and specifications and mapping. Justin additionally handles land development and grading design projects, conducted earthwork calculations, and incorporates typical designs. He is proficient in federally funded projects as well, and familiar with the Caltrans Local Assistance Procedures Manual (LAPM). Justin has successfully taken multiple projects from the initial federal funding application, to the Preliminary Environmental Study, to E-76 approval, and all the way through construction of audited federally funded construction projects.
He has experience managing construction projects and handles planning and running kickoff meetings with the contractor, reviewing project submittals, RFIs, CCOs, and checking contractor invoices against field quantities. Justin ensures to coordinate the daily construction details with the contractor and inspector. He has completed multiple SWPPPs and erosion and sediment control plans per the latest Construction General Permit. exPerIence
lovekIn boulevarD anD barnarD street rehabIlItatIon Project, blythe Justin is the Project Manager on the Lovekin Blvd. and Barnard St. Rehabilitation Project in the City of Blythe to rehabilitate two street segments, 66,403 SF of Lovekin Boulevard, from Hobson Way to Barnard Street; and 81,946 SF of Barnard Street, from the first alley easterly of Lovekin Boulevard to the west edge of Main Street. The combined length is approximately 2,795 linear feet (0.53 miles). The work also includes replacing existing curb ramps with ADA compliant curb ramps, concrete infrastructure repairs (i.e. curb, gutter, sidewalk, and driveways), adjusting or relocating utility appurtenances, and signing and striping replacement. DATE: 2021 euclID roaDway & sewer reconstructIon Project, Fullerton Justin was the Project Manager to the City of Fullerton. The project consisted of reconstructing or resurfacing approximately 3,700 linear feet of arterial streets between Fern Drive and Williamson Avenue and replacing approximately 1,700 feet of sewer mains between Malvern Avenue and Commonwealth Avenue. The project also included reconstructing 9 ADA ramps to bring them up to the most current ADA standards. The sewer work included removing the existing 10-inch VCP and replacing it with new 12-inch VCP pipe between Commonwealth and Malvern and removing and replacing sewer north of Malvern to the end of the street project limits at Fern without upsizing. The worked also included removing the manholes at the center of the Euclid Street/Chapman Avenue intersection and establishing a new connection point approximately 50 feet to the east along Chapman Avenue as well as reconstructing the double barrel siphon and adjusting invert elevations to achieve a suitable slope. The design utilized a trenchless method to install the siphon beneath the OCPW Brea Creek Channel. Additional tasks included adjusting manhole elevations and reconnected service laterals, constructing new curb and gutter where gutter is absent, constructing ADA compliant curb ramps, and repairing curb, gutter, cross gutters, sidewalks and driveways where required. The City utilized SB1 funds for the road rehabilitation and local funds for the sewer improvements. DATE: 2019 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -138-
'n
7-year annual resIDentIal rehabIlItatIon Project, DIamonD barJustin was the Project and Construction Manager to the Ci t
y
o
f
D
i
a
m
o
n
d
B
a
r
o
n
t
h
e
i
r
a
n
n
u
a
l
a
r
t
e
r
i
a
l
a
n
d
r
e
s
i
d
e
n
t
i
a
l
roadway maintenance projects for an annual period of 7
y
e
a
r
s
.
Y
e
a
r
s
2 0
1 0
a
n
d
2 0
1 1
w
e
r
e
a
w
a
r
d
e
d
a
s
s
e
p
a
r
a
t
e
contracts. The City awarded OE an additional 3-year contra c
t
f
o
r
2 0
1 2
–
2 0
1 4
.
I
n
2 0
1 5
,
t
h
e
C
i
t
y
o
f
D
i
a
m
o
n
d
B
a
r
a
w
a
r
d
e
d
OE yet another annual rehabilitation project. The project siz e
s
a
n
d
c
o
s
t
s
w
e
r
e
:
2 0
1 0
:
1 1
.
8 m
i
l
e
s
o
f
a
r
t
e
r
i
a
l
&
r
e
s
i
d
e
n
t
i
a
l
streets ($908 K), 2011: 19 miles of arterial & residential street s
(
$
1 .
8 M
)
,
2 0
1 2
:
1 0
m
i
l
e
s
o
f
a
r
t
e
r
i
a
l
a
n
d
r
e
s
i
d
e
n
t
i
a
l
s
t
r
e
e
t
s
($1.1 M), 2013: 13 miles of arterial & residential streets ($1.3 M),
2 0
1 4
:
1 4
.
5 m
i
l
e
s
o
f
r
e
s
i
d
e
n
t
i
a
l
,
a
r
t
e
r
i
a
l
&
c
o
l
l
e
c
t
o
r
s
t
r
e
e
t
s
($1.8 M), 2015: 14 miles of residential, arterial & collector str e
e
t
s
(
$
1 .
7 5
M
)
a
n
d
2 0
1 6
/
2 0
1 7
:
1 6
.
6 m
i
l
e
s
o
f
r
e
s
i
d
e
n
t
i
a
l
a
n
d
collector streets ($1.58 million). The general scope of work f o
r
e
a
c
h
y
e
a
r
’
s
p
r
o
j
e
c
t
i
n
c
l
u
d
e
d
l
o
c
a
l
i
z
e
d
R
&
R
p
a
t
c
h
i
n
g
,
grind and overlay, cape and slurry seal, traffic loops, traffi c
s
t
r
i
p
i
n
g
,
a
n
d
r
e
q
u
i
r
e
d
h
e
a
v
y
t
r
a
f
f
i
c
p
h
a
s
i
n
g
a
n
d
t
r
a
f
f
i
c
control review. Justin assisted the City through the projec t
b
i
d
d
i
n
g
p
h
a
s
e
,
d
e
v
e
l
o
p
i
n
g
t
e
x
t
a
n
d
s
t
i
p
u
l
a
t
i
o
n
s
f
o
r
t
h
e
bid package to ensure contractor availability during the de s
i
r
e
d
w
o
r
k
i
n
g
m
o
n
t
h
s
.
D
u
e
t
o
t
h
e
p
r
o
x
i
m
i
t
y
t
o
f
r
e
e
w
a
y
s
,
Justin also coordinated with Caltrans to obtain encroachm e
n
t
p
e
r
m
i
t
s
f
o
r
t
h
e
C
i
t
y
f
o
r
f
o
u
r
o
f
t
h
e
p
r
o
j
e
c
t
s
,
w
h
i
c
h
w
a
s
essential. DATE: 2010-2018
los nIetos roaD rehabIlItatIon Project, santa Fe sPrIngsJustin is providing Project Management services to the C
i
t
y
o
f
S
a
n
t
a
F
e
S
p
r
i
n
g
s
t
o
r
e
h
a
b
i
l
i
t
a
t
e
a
p
p
r
o
x
i
m
a
t
e
l
y
2.3 miles of roadway on Los Nietos Road between Pioneer Blv d
.
a
n
d
P
a
i
n
t
e
r
A
v
e
.
T
h
e
s
e
g
m
e
n
t
o
f
L
o
s
N
i
e
t
o
s
w
a
s
n
o
t
e
d
to be in poor condition. Widespread alligator cracking, bloc k
c
r
a
c
k
i
n
g
,
a
n
d
p
o
t
h
o
l
i
n
g
w
e
r
e
o
b
s
e
r
v
e
d
t
h
r
o
u
g
h
o
u
t
t
h
e
project limits. The rehabilitation entailed available grind and o
v
e
r
l
a
y
o
n
t
h
e
s
t
r
e
e
t
s
e
g
m
e
n
t
s
a
n
d
m
i
l
l
i
n
g
t
h
e
f
u
l
l
w
i
d
t
h
of the street in areas where the deterioration was extensiv e
.
O
u
r
t
e
a
m
a
l
s
o
i
d
e
n
t
i
f
i
e
d
a
r
e
a
s
o
f
i
s
o
l
a
t
e
d
d
e
t
e
r
i
o
r
a
t
i
o
n
where digouts and milling the edges of the street may be n e
c
e
s
s
a
r
y
.
A
d
d
i
t
i
o
n
a
l
t
a
s
k
s
i
n
c
l
u
d
e
r
e
c
o
n
s
t
r
u
c
t
i
n
g
c
u
r
b
,
gutter, cross-gutters, and sidewalks in disrepair, as well as
c
o
n
s
t
r
u
c
t
i
n
g
A
D
A
c
o
m
p
l
i
a
n
t
d
r
i
v
e
w
a
y
s
a
n
d
c
u
r
b
r
a
m
p
s
.
Railroad right-of-ways intersect Los Nietos Road within the l
i
m
i
t
s
o
f
t
h
e
p
r
o
j
e
c
t
.
A
l
l
d
e
s
i
g
n
a
n
d
c
o
n
s
t
r
u
c
t
i
o
n
a
c
t
i
v
i
t
i
e
s
within these right-of-way was coordinated with the PUC
a
n
d
c
a
r
r
i
e
d
o
u
t
i
n
a
c
c
o
r
d
a
n
c
e
w
i
t
h
t
h
e
a
p
p
l
i
c
a
b
l
e
P
U
C
Codes. DATE: 2020
bellFlower boulevarD comPlete streets Project-hsIP FunDeD, bellFlowerJustin performed Project Management services for the City o
f
B
e
l
l
f
l
o
w
e
r
o
n
t
h
e
H
S
I
P
–
B
e
l
l
f
l
o
w
e
r
B
o
u
l
e
v
a
r
d
C
o
m
p
l
e
t
e
Streets Project. The project consists of enhancing approxi m
a
t
e
l
y
2 ,
2 0
0 l
i
n
e
a
r
f
e
e
t
(
0 .
4 2
m
i
l
e
s
)
o
f
B
e
l
l
f
l
o
w
e
r
B
o
u
l
e
v
a
r
d
from Artesia Boulevard to the South City Limit, approximate l
y
3 3
0 f
e
e
t
s
o
u
t
h
o
f
R
o
s
e
S
t
r
e
e
t
.
B
e
l
l
f
l
o
w
e
r
B
o
u
l
e
v
a
r
d
i
s
an arterial street with two lanes of traffic and curbside pa r
k
i
n
g
i
n
b
o
t
h
d
i
r
e
c
t
i
o
n
s
,
a
d
u
a
l
l
e
f
t
t
u
r
n
l
a
n
e
,
a
n
d
t
r
a
f
f
i
c
signals at high volume intersections. The project was partiall y
f
u
n
d
e
d
b
y
C
y
c
l
e
9 o
f
t
h
e
H
i
g
h
w
a
y
S
a
f
e
t
y
I
m
p
r
o
v
e
m
e
n
t
Program (HSIP). The project has an estimated cost of $1,16 2 ,
1 0
0 .
T
h
e
s
t
r
e
e
t
e
n
h
a
n
c
e
m
e
n
t
s
i
n
c
l
u
d
e
d
a
d
d
i
n
g
C
l
a
s
s
I
I
I
Bike Lanes, reducing the lane widths, adding raised median s
w
i
t
h
l
a
n
d
s
c
a
p
i
n
g
a
n
d
i
r
r
i
g
a
t
i
o
n
,
u
p
g
r
a
d
i
n
g
a
n
d
a
d
d
i
n
g
high visibility crosswalks, rapid flashing beacons, and pede s
t
r
i
a
n
c
o
u
n
t
d
o
w
n
h
e
a
d
s
a
t
t
h
e
i
n
t
e
r
s
e
c
t
i
o
n
s
,
b
u
l
b
-
o
u
t
s
,
and road resurfacing. DATE: 2020
west 17th street wIDenIng Project, costa mesaJustin was the Project Manager for the City of Costa Mesa o n
t
h
e
W
e
s
t
1 7
t
h
S
t
r
e
e
t
W
i
d
e
n
i
n
g
,
f
r
o
m
P
l
a
c
e
n
t
i
a
A
v
e
n
u
e
t
o
Superior Avenue. 17th Street is a primary arterial. The Standa r
d
r
o
a
d
w
a
y
w
i
d
t
h
f
o
r
a
p
r
i
m
a
r
y
a
r
t
e
r
i
a
l
i
s
a
1 0
6 ’
r
i
g
h
t
o
f
w
a
y
.
The existing configuration was a 2-lane divided highway with
c
e
n
t
e
r
t
w
o
-
w
a
y
l
e
f
t
t
u
r
n
l
a
n
e
.
T
h
e
e
x
i
s
t
i
n
g
l
a
n
d
u
s
e
s
w
e
r
e
mostly commercial properties with a new mixed-use develo p
m
e
n
t
a
t
t
h
e
s
o
u
t
h
e
a
s
t
c
o
r
n
e
r
o
f
1 7
t
h
S
t
r
e
e
t
a
n
d
P
o
m
o
n
a
Avenue. There were 16 properties along West 17th Street wit h
i
n
t
h
e
l
i
m
i
t
s
o
f
t
h
i
s
w
i
d
e
n
i
n
g
.
T
h
e
p
r
o
p
e
r
t
i
e
s
a
l
o
n
g
W
e
s
t
17th Street had varying R/W frontages. This meant that wide n
i
n
g
a
f
f
e
c
t
e
d
e
a
c
h
p
r
o
p
e
r
t
y
d
i
f
f
e
r
e
n
t
l
y
.
T
h
e
d
e
s
i
g
n
i
n
t
e
n
t
for this widening was to meet the classification of four-lane
P
r
i
m
a
r
y
A
r
t
e
r
i
a
l
a
s
d
e
s
c
r
i
b
e
d
i
n
t
h
e
O
C
T
A
M
a
s
t
e
r
P
l
a
n
o
f
Arterial Highways (MPAH). This includes 2-lanes in each direct i
o
n
w
i
t
h
a
m
e
d
i
a
n
.
DATE: 2018cDbg resIDentIal street ImProvement Project-Fy 2018-19 c.o. no. 7150, hesPerIaJustin was the Project Manager for the City of Hesperia o n
t
h
e
F
Y
2 0
1 8
-
1 9
C
D
B
G
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
s
P
r
o
j
e
c
t
.
T
h
e
project consists of constructing approximately 8,550 linear f e
e
t
o
f
s
t
r
e
e
t
s
.
T
h
e
p
r
o
j
e
c
t
l
i
m
i
t
s
i
n
c
l
u
d
e
d
A
s
h
S
t
r
e
e
t
f
r
o
m
Seventh Avenue to Eleventh Avenue (2,850 linear feet), Lar c
h
S
t
r
e
e
t
f
r
o
m
S
e
v
e
n
t
h
A
v
e
n
u
e
t
o
E
l
e
v
e
n
t
h
A
v
e
n
u
e
(
2 ,
8 5
0 linear feet), and Wells Fargo Street from Seventh Avenue to El e
v
e
n
t
h
A
v
e
n
u
e
(
2 ,
8 5
0 l
i
n
e
a
r
f
e
e
t
)
.
T
h
e
s
t
r
e
e
t
s
a
r
e
l
o
c
a
t
e
d
within a residential zone and are to be upgraded from dirt r o
a
d
w
a
y
s
t
o
2 6
”
w
i
d
e
a
s
p
h
a
l
t
c
o
n
c
r
e
t
e
p
a
v
e
m
e
n
t
w
i
t
h
a
n
inverted crown design. Additionally, all surface utility appurt e
n
a
n
c
e
s
w
e
r
e
t
o
b
e
p
r
e
s
e
r
v
e
d
/
m
o
d
i
f
i
e
d
t
o
a
c
c
o
m
m
o
d
a
t
e
the new roadways and driveways of the adjacent residences w
e
r
e
t
i
e
d
i
n
t
o
t
h
e
s
t
r
e
e
t
s
.
DATE: 2018
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-139-
J
, L
robert valle, qsP, cIsec
construction insPector
30 yearS of exPerience5
yearS witH Firm
FielDs oF exPertise:
ROADWAY BRIDGE PAVEMENT ADA RAMP DRAINAGE
qualIFIcatIons
cIsec #2075 Certified Inspector | Sediment & Erosion Control • qsP #26670 Qualified SWPPP Practitioner conFIneD sPace Cal OSHA Construction Safety and Health • ExtEnsivE CoursEs in MathEMatiCs & PubliC Works • exPerience in: Capital Improvement Projects, Encroachment Permitting, Job Order Contracts
backgrounD
Robert is a highly skilled Public Works inspector with over 30 years of experience. He emphasizes an attention to quality, detail and safety on various types of construction projects. His experience involves supplemental task orders and contract change orders; submittals and RFI’s review and response related to constructability; signatory on Notice to Proceed, Progress Payments, Notice of Completion, ensuring project documentation of inspector daily logs, photographs, concurrence of quantities with contractor for payment, and attending meetings with design engineers, stakeholders, and outside agencies. Robert has been responsible for inspector training related to construction, public relations and safety, and for project constructability peer reviews of PS&E. He is well versed in agency special provision that involve Caltrans Standards & Specifications, Standard Specifications for Public Works Construction (Greenbook), public works agency standards, CA MUTCD and WATCH Manual, Regulatory Permits, and NPDES Requirements, alongside document control. Robert also incorporates his skills and knowledge in managing public relations, and he is effective with adept communication toward project stakeholders. He has worked on projects involving road and arterial maintenance and rehabilitation, flood control and bridge repair, grind and overlay, slurry seal, traffic signal upgraids, PCC removal, ADA access ramps replacement, curb, gutter and sidewalk. exPerIence
local streets rehabilitation concrete imProvements, zone 32, norwalk Robert provided inspection services on this project for the City of Norwalk. The project area (Zone 32) is bound by Alondra Boulevard to the north, 166th Street to the south, Pioneer Boulevard to the west, and Norwalk Boulevard to the east. The work entailed ADA ramp improvements, driveway improvements and sidewalk improvements within Zone 32. DATE : 2019
laDera ranch street ImProvement Project, laDera ranch
Robert served as Construction Inspector for the City of Ladera Ranch on the Ladera Ranch Street Improvement Project. The work included cold milling 125,230 SY of existing local and major collector streets, placement of over 24,000 tons of Asphalt Rubber Hot Mix to reinforce fabric Tensar BX 1200 and Glass Pave. The scope of work required remedial repairs of deteriorated pavement sections, curb & gutter, sidewalks, curb ramps for ADA compliance replacements, traffic control (collector and local streets), detour plans, NPDES compliance, utility adjustments (manholes and valves), and striping/stenciling. Also included was pavement crack sealing and approximately 275,000 SY of Slurry Seal placement. Robert oversaw the project schedule and payments to the Contractor, and handled the documentation and project close out for acceptance. He ensured all necessary NPDES BMPs were installed and maintained, and that all compaction of subgrade, aggregate base, and asphalt concrete met the relative compaction minimum percentage requirements. Robert additionally coordinated with local schools, and the Ladera Civic Committee to phase the work in order to minimize inconveniences to nearby residents. . DATE: 2016 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -140-
1....44‘: .HZJ'JtCEAé @ .
I--.: MUM):
santiago canyon roaDway imProvements, lake ForestOn the Santiago Canyon Roadway Improvements Project fo r
t
h
e
C
i
t
y
o
f
L
a
k
e
F
o
r
e
s
t
,
R
o
b
e
r
t
s
e
r
v
e
d
a
s
C
o
n
s
t
r
u
c
t
i
o
n
Inspector in charge of the cold milling and asphalt concr e
t
e
o
v
e
r
l
a
y
o
f
S
a
n
t
i
a
g
o
C
a
n
y
o
n
R
o
a
d
(
5 m
i
l
e
s
)
i
n
c
l
u
d
i
n
g
striping/stenciling, traffic control, and over side drains.
C
o
o
r
d
i
n
a
t
i
o
n
w
i
t
h
t
h
e
C
i
t
y
o
f
L
a
k
e
F
o
r
e
s
t
.
T
h
e
p
r
o
j
e
c
t
included remedial repair of deteriorated pavement sectio n
s
.
R
o
b
e
r
t
w
a
s
r
e
s
p
o
n
s
i
b
l
e
f
o
r
a
l
l
p
r
o
j
e
c
t
d
o
c
u
m
e
n
t
a
t
i
o
n
including Inspection daily logs, weekly statement of worki n
g
d
a
y
s
,
p
r
o
j
e
c
t
p
h
o
t
o
g
r
a
p
h
s
(
b
e
f
o
r
e
,
d
u
r
i
n
g
a
n
d
p
o
s
t
construction), submittal/RFI review and response, and
b
a
c
k
u
p
f
o
r
p
a
y
m
e
n
t
s
.
R
o
b
e
r
t
e
n
s
u
r
e
d
t
h
a
t
a
l
l
N
P
D
E
S
requirements were met, including adherence to the projec t
S
W
P
P
P
a
n
d
a
l
l
n
e
c
e
s
s
a
r
y
B
M
P
s
,
a
n
d
t
o
e
n
s
u
r
e
t
h
a
t
a
l
l
material testing met the specifications of the project. DATE: 2001 glassell avenue street/briDge wiDening Project, anaheImRobert was the Construction Inspector for the Glassell Ave n
u
e
S
t
r
e
e
t
/
B
r
i
d
g
e
W
i
d
e
n
i
n
g
P
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
r
e
q
u
i
r
e
d
adding one lane in each direction over the Santa Ana River C
h
a
n
n
e
l
,
i
n
c
l
u
d
i
n
g
b
i
k
e
l
a
n
e
s
,
s
i
d
e
w
a
l
k
,
a
s
p
h
a
l
t
p
a
v
i
n
g
,
striping/stenciling, and bridge lighting. Coordination with t h
e
C
i
t
i
e
s
o
f
A
n
a
h
e
i
m
a
n
d
O
r
a
n
g
e
,
O
r
a
n
g
e
C
o
u
n
t
y
W
a
t
e
r
District, and the Army CORPS of Engineers was required. Al l
N
P
D
E
S
r
e
q
u
i
r
e
d
a
d
h
e
r
e
n
c
e
t
o
t
h
e
p
r
o
j
e
c
t
S
W
P
P
P
a
n
d
all necessary BMPs. Robert ensured project Inspection
d
a
i
l
y
l
o
g
s
,
w
e
e
k
l
y
s
t
a
t
e
m
e
n
t
o
f
w
o
r
k
i
n
g
d
a
y
s
,
p
r
o
j
e
c
t
photographs (before, during and post construction), sub m
i
t
t
a
l
/
R
F
I
r
e
v
i
e
w
a
n
d
r
e
s
p
o
n
s
e
,
a
n
d
b
a
c
k
u
p
f
o
r
p
a
y
m
e
n
t
s
were propoerly documented and delivered accordingly, and t
h
a
t
a
l
l
m
a
t
e
r
i
a
l
t
e
s
t
i
n
g
m
e
t
p
r
o
j
e
c
t
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
DATE: 2016
antonIo Parkway grInD & overlay arterIal streets ImProvements Project, mission viejo Robert served as the Construction Manager for the constru c
t
i
o
n
o
n
t
h
i
s
m
a
j
o
r
a
r
t
e
r
i
a
l
h
i
g
h
w
a
y
p
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
called for Asphalt Rubber Hot Mix and reinforcing fabric Ten s
a
r
B
X
1 2
0 0
,
G
l
a
s
s
P
a
v
e
,
a
n
d
r
o
c
k
d
u
s
t
b
l
o
t
t
e
r
.
T
h
e
p
r
o
j
e
c
t
included remedial repair of deteriorated pavement sections, c
u
r
b
&
g
u
t
t
e
r
,
s
i
d
e
w
a
l
k
s
,
c
u
r
b
r
a
m
p
s
f
o
r
A
D
A
c
o
m
p
l
i
a
n
c
e
,
traffic control (arterial), detour plans, NPDES compliance, a
n
d
s
t
r
i
p
i
n
g
/
s
t
e
n
c
i
l
i
n
g
.
C
o
o
r
d
i
n
a
t
i
o
n
w
i
t
h
l
o
c
a
l
s
c
h
o
o
l
s
,
Ladera Civic Committee, and the City for lane closures wa s
c
o
n
d
u
c
t
e
d
i
n
o
r
d
e
r
t
o
m
i
n
i
m
i
z
e
i
n
c
o
n
v
e
n
i
e
n
c
e
t
o
t
h
e
public residents. Robert oversaw that all compaction of su b
g
r
a
d
e
,
a
g
g
r
e
g
a
t
e
b
a
s
e
,
a
n
d
a
s
p
h
a
l
t
c
o
n
c
r
e
t
e
m
e
t
t
h
e
minimum percentage requirements. DATE: 2018
santa ana rIver IntercePtor (sarI) & sewer maIn rePlacement Project, yorba linDa Robert was the Construction Manager for the constructi
o
n
o
f
a
n
e
w
1 5
-
i
n
c
h
V
C
P
s
e
w
e
r
m
a
i
n
g
r
a
v
i
t
y
l
i
n
e
w
i
t
h
i
n
the City of Yorba Linda. The project was located along La P
a
l
m
a
A
v
e
n
u
e
,
w
h
i
c
h
r
u
n
s
p
a
r
a
l
l
e
l
t
o
t
h
e
S
a
n
t
a
A
n
a
R
i
v
e
r
Channel. The project included a new order control station w
i
t
h
i
n
t
h
e
S
a
n
t
a
A
n
a
R
i
v
e
r
C
h
a
n
n
e
l
r
i
g
h
t
-
o
f
-
w
a
y
,
a
n
1 8
-
inch PVC encased siphon, which crossed the limits of t
h
e
c
h
a
n
n
e
l
s
o
f
t
-
b
o
t
t
o
m
i
n
v
e
r
t
t
h
a
t
t
i
e
d
i
n
t
o
t
h
e
n
e
w
l
y
constructed SARI Main Line. The project also involved one m
i
c
r
o
t
u
n
n
e
l
i
n
g
o
p
e
r
a
t
i
o
n
a
n
d
m
a
n
h
o
l
e
(
s
)
c
o
n
s
t
r
u
c
t
i
o
n
.
Work was performed under a City permit and included tre n
c
h
s
h
o
r
i
n
g
,
b
a
c
k
f
i
l
l
,
t
r
e
n
c
h
p
a
v
i
n
g
,
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
o
f
La Palma Avenue, traffic control, striping/stenciling, an SW P
P
P
R
i
s
k
L
e
v
e
l
2 a
n
d
a
l
l
n
e
c
e
s
s
a
r
y
B
M
P
s
t
o
m
e
e
t
N
P
D
E
S
requirements. The project had multiple stakeholders includi n
g
O
C
F
C
D
,
O
C
P
u
b
l
i
c
W
o
r
k
s
,
O
C
P
a
r
k
s
(
C
R
V
P
)
,
O
C
S
u
r
v
e
y
,
OCSD, Consultant Management Group (MWH Constructors),
C
o
n
s
u
l
t
a
n
t
D
e
s
i
g
n
(
T
e
t
r
a
T
e
c
h
)
,
C
i
t
y
o
f
Y
o
r
b
a
L
i
n
d
a
,
U
S
Army CORPS of Engineers, and California Department of Fi s
h
a
n
d
W
i
l
d
l
i
f
e
.
C
o
o
r
d
i
n
a
t
i
o
n
w
i
t
h
o
w
n
e
r
(
O
C
S
D
)
o
f
t
h
e
sewer line and odor control station was required in order t o
o
b
t
a
i
n
f
i
n
a
l
a
c
c
e
p
t
a
n
c
e
.
R
o
b
e
r
t
e
n
s
u
r
e
d
t
h
a
t
a
l
l
s
h
o
r
i
n
g
met Cal OSHA requirements and that all material testing me t
t
h
e
m
i
n
i
m
u
m
r
e
q
u
i
r
e
m
e
n
t
s
.
DATE: 2015mIDway cIty asPhalt concrete Pavement overlay Project, miDwayRobert was the Construction Manager for the Orange Cou n
t
y
a
r
e
a
o
f
M
i
d
w
a
y
C
i
t
y
.
W
i
t
h
i
n
t
h
e
l
i
m
i
t
s
a
l
s
o
i
n
v
o
l
v
e
d
the City of Westminster. The project included utilizing co l
d
m
i
l
l
i
n
g
o
f
r
o
a
d
w
a
y
s
,
p
l
a
c
i
n
g
A
s
p
h
a
l
t
R
u
b
b
e
r
H
o
t
M
i
x
,
aggregate base (CMB), reinforcing fabric Tensar BX 1200, a n
d
G
l
a
s
s
P
a
v
e
.
T
h
e
m
a
i
n
s
c
o
p
e
o
f
t
h
e
p
r
o
j
e
c
t
i
n
c
l
u
d
e
d
remedial repair of deteriorated pavement sections, curb & g
u
t
t
e
r
,
c
r
o
s
s
g
u
t
t
e
r
s
a
n
d
s
p
a
n
d
r
e
l
s
,
c
u
r
b
r
a
m
p
s
f
o
r
A
D
A
compliance, traffic control (arterial and local streets), detou r
p
l
a
n
s
,
N
P
D
E
S
c
o
m
p
l
i
a
n
c
e
,
a
l
l
e
y
p
a
v
i
n
g
a
n
d
l
o
n
g
i
t
u
d
i
n
a
l
gutter, and striping/stenciling. Coordination with local sch o
o
l
s
a
n
d
t
h
e
C
i
t
y
o
f
W
e
s
t
m
i
n
s
t
e
r
f
o
r
p
h
a
s
i
n
g
o
f
w
o
r
k
t
o
minimize inconvenience to the public residents was implem e
n
t
e
d
.
R
o
b
e
r
t
a
d
d
i
t
i
o
n
a
l
l
y
e
n
s
u
r
e
d
t
h
a
t
a
l
l
c
o
m
p
a
c
t
i
o
n
of subgrade, aggregate base, and asphalt concrete met the r
e
l
a
t
i
v
e
c
o
m
p
a
c
t
i
o
n
m
i
n
i
m
u
m
p
e
r
c
e
n
t
a
g
e
r
e
q
u
i
r
e
m
e
n
t
s
.
DATE: 2012
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-141-
J
, L
cHriS boren
construction insPector
17 yearS of exPerience10
yearS witH Firm
FielDs oF exPertise:
ROADWAY PAVEMENT ADA RAMP SIDEWALK WIDENING
qualIFIcatIons
levelS I & II: Public Works Inspector • experience: Federally Funded Projects; CA State Caltrans Projects backgrounD
Chris is a Construction Inspector at Onward Engineering. He has a variety of certifications and has taken part in multiple training programs over his 17 years of experience. His experience includes a plethora of projects, and he advocates safety and quality at the jobsite. His accuracy and efficiency in the field ensure a successful project. Chris’ work will always include making sure that the contractor is efficient with his time and acting in the best interest of the City as their advocate in the field.
exPerIence
19th st. hellman ave. Pavement rehabilitation, rancho cucamonga Chris provided inspection services to the City of Rancho Cucamonga on the 19th St. Hellman Avenue Pavement Rehabilitation project. The project limits were from Haven Avenue to West City Limit, and Hellman Avenue from Baseline Road to 19th Street. The project included a Grind and Asphalt Rubber Hot Mix (ARHM) overlay, adjustments to manholes, water valves, and gas valves. It also included the installation of traffic loops, traffic signs, striping, and traffic signal video detection. In addition, the project called for traffic control for the duration of the project. DATE: 12/2014 bristow Park neighborhooD rehabilitation Project, commerce Chris provided inspection services on this CDBG-funded project roadway project in the City of Commerce.
The Bristow Park Neighborhood Rehabilitation Project was constricted by the I-5 Freeway to the north, BNSF Railroad to the south, the City of Los Angeles Boundary to the west and the 710 Freeway to the east. The project covered approximately 4,900 LF of roadway. During the design phase a cost-benefit analysis was conducted to provide the City with multiple rehabilitation alternatives, including conventional full-depth reconstruction, Asphalt Rubber Aggregate Membrane (ARAM), Asphalt Rubber Hot Mix (ARHM), Inter-layer Systems and Cold-In-Place Recycling (CIR)/Full Depth Reclamation. Multiple design coordination meetings were additionally held between the City, OE and other stakeholders during design to ensure the most complete design possible. A combination of full-depth reclamation and reconstruction and Grind & Overlay was the selected rehabilitation method. Construction also included replacing damaged sidewalk, installing 25 new ramps and upgrading 13 more to meet ADA compliance, reconstruction of cross-gutters, and replacing street signs, trimming tree roots and installing barriers. DATE: 11/2013 resiDential area 1b & arterial zone 7 roaD maintenance Project, DIamonD bar Chris was the Inspector in the City of Diamond Bar. Areas 1B and Zone 7 consisted of 8.9 miles of residential streets, 1.3 miles of collector streets, and 2.5 miles of arterial roadways. For the annual project OE was tasked with providing a design for rehabilitating the streets in a manner that meets the City’s tight budget.
Each street was individually inspected to determine the most cost effective remedy. The scope of work entailed 29,000 SY of chip seal, type II slurry seal, 5,235 tons of AC overlay, 210,000 SF of cold milling the existing pavement to a variable-depth of 6’ from the edge of the gutter, removal and replacement of 2,249 tons of AC pavement, adjusting 127 manhole frames and covers, and 147 water & gas valve covers, and installing 6 traffic loop detectors. Furthermore, an elementary school was within the project limits, which made scheduling and phasing for both the pavement and striping operations essential in order to provide safety and accessibility from beginning and end of the school day. DATE: 01/2014 SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -142-
crenshaw blvD. & lomita blvD. Intersection ImProvement Project, lomItaChris provided inspection Services for this arterial roadw a
y
a
n
d
i
n
t
e
r
s
e
c
t
i
o
n
r
e
h
a
b
i
l
i
t
a
t
i
o
n
p
r
o
j
e
c
t
i
n
t
h
e
C
i
t
i
e
s
of Lomita and Torrance. As a joint agency project, it requi r
e
d
e
x
t
e
n
s
i
v
e
c
o
o
r
d
i
n
a
t
i
o
n
w
i
t
h
b
o
t
h
t
h
e
C
i
t
y
o
f
L
o
m
i
t
a
and Torrance in order to ensure success of the project. The
p
r
o
j
e
c
t
l
i
m
i
t
s
s
p
a
n
n
e
d
1 ,
3 0
0 L
F
o
n
C
r
e
n
s
h
a
w
B
o
u
l
e
v
a
r
d
to the north and south of Lomita Blvd., and 2,900 LF on L
o
m
i
t
a
B
l
v
d
.
f
r
o
m
C
r
e
n
s
h
a
w
B
l
v
d
.
t
o
N
a
r
b
o
n
n
e
A
v
e
n
u
e
.
The construction included 4,800 tons of ARHM overlay, 1 ,
5 0
0 t
o
n
s
o
f
A
C
b
a
s
e
p
a
v
i
n
g
,
f
i
e
l
d
i
d
e
n
t
i
f
i
c
a
t
i
o
n
a
n
d
reconstruction of failed pavement areas, PCC curb ramp, si d
e
w
a
l
k
a
n
d
c
u
r
b
a
n
d
g
u
t
t
e
r
r
e
p
l
a
c
e
m
e
n
t
s
,
t
r
a
f
f
i
c
s
i
g
n
a
l
modifications including the installation of a new video dete c
t
i
o
n
s
y
s
t
e
m
a
n
d
t
h
e
r
e
w
i
r
i
n
g
o
f
t
h
e
i
n
t
e
r
s
e
c
t
i
o
n
s
,
a
n
d
roadway signing and striping improvements. The project
a
l
s
o
i
n
c
l
u
d
e
d
c
h
a
i
r
i
n
g
a
n
d
p
r
e
s
e
n
t
i
n
g
a
t
a
c
o
m
m
u
n
i
t
y
coordination meeting in order to disseminate project infor m
a
t
i
o
n
.
I
n
a
d
d
i
t
i
o
n
,
t
h
e
p
r
o
j
e
c
t
r
e
q
u
i
r
e
d
w
o
r
k
i
n
g
w
i
t
h
t
h
e
Contractor and the City to negotiate field quantity reducti o
n
s
a
n
d
c
h
a
n
g
e
o
r
d
e
r
s
w
h
i
c
h
c
r
e
a
t
e
d
a
l
a
r
g
e
a
m
o
u
n
t
o
f
project savings on the job. DATE: 02/2014
rosInI & rosewooD rehabIlItatIon Project-Phase I & II, commerceChris provided inspection services to the City of Com m
e
r
c
e
o
n
p
h
a
s
e
s
I
a
n
d
I
I
o
f
t
h
e
R
o
s
i
n
i
a
n
d
R
o
s
e
w
o
o
d
Neighborhood Roadway Rehabilitation project. This politi c
a
l
l
y
-
s
e
n
s
i
t
i
v
e
r
e
s
i
d
e
n
t
i
a
l
r
e
c
o
n
s
t
r
u
c
t
i
o
n
p
r
o
j
e
c
t
t
o
o
k
place just south of I-5 and north of heavily traveled Washin g
t
o
n
B
o
u
l
e
v
a
r
d
.
D
u
r
i
n
g
t
h
e
d
e
s
i
g
n
,
a
t
h
o
r
o
u
g
h
p
a
v
e
m
e
n
t
investigation was conducted, which included an inventory of
p
o
t
e
n
t
i
a
l
p
a
r
k
w
a
y
i
m
p
r
o
v
e
m
e
n
t
s
w
h
i
c
h
w
e
r
e
p
r
i
o
r
i
t
i
z
e
d
to ensure maximum utilization of the City’s available budge t
.
O
u
r
t
e
a
m
p
r
e
s
e
n
t
e
d
s
e
v
e
r
a
l
o
p
t
i
o
n
s
t
o
t
h
e
C
i
t
y
w
i
t
h
a
cost-benefit analysis. This heavily deteriorated roadway w a
s
r
e
c
o
n
s
t
r
u
c
t
e
d
u
t
i
l
i
z
i
n
g
F
u
l
l
-
D
e
p
t
h
R
e
c
l
a
m
a
t
i
o
n
,
1 4
”
o
f
roadway was excavated, and a 10” section was treated wit h
c
e
m
e
n
t
.
T
h
e
c
o
n
s
t
r
u
c
t
i
o
n
e
n
t
a
i
l
e
d
r
e
p
l
a
c
i
n
g
c
u
r
b
a
n
d
gutter and sidewalk, adjusting 33 manholes and 19 valve lid s
,
i
n
s
t
a
l
l
i
n
g
l
o
o
p
s
a
n
d
t
r
a
f
f
i
c
s
t
r
i
p
i
n
g
,
a
s
w
e
l
l
a
s
e
n
s
u
r
i
n
g
that ramps met ADA standards. DATE: 08/2012-06/2013
chIno hIlls Parkway & chIno ave. rehabIlItatIon - stPl FunDeD, DIamonD barChris was the construction inspector for the City of D
i
a
m
o
n
d
B
a
r
f
o
r
t
h
i
s
S
T
P
L
-
f
u
n
d
e
d
p
r
o
j
e
c
t
.
T
h
e
s
i
t
e
spanned 1.25 miles along Chino Hills Parkway, from the no r
t
h
c
i
t
y
l
i
m
i
t
t
o
t
h
e
s
o
u
t
h
c
i
t
y
l
i
m
i
t
,
a
n
d
C
h
i
n
o
A
v
e
n
u
e
,
from Chino Hills Parkway to the eastern city limit. The scope
i
n
c
l
u
d
e
d
g
r
i
n
d
a
n
d
A
R
H
M
o
v
e
r
l
a
y
,
7 8
3 S
F
o
f
l
o
c
a
l
R
&
R
,
a
n
d
minimal PCC curb, gutter, and sidewalk replacements. A con s
t
r
u
c
t
a
b
i
l
i
t
y
r
e
v
i
e
w
w
a
s
c
o
n
d
u
c
t
e
d
p
r
i
o
r
t
o
c
o
n
s
t
r
u
c
t
i
o
n
commencing, and noted several additional reconstructio
n
a
r
e
a
s
a
l
o
n
g
w
i
t
h
s
e
v
e
r
a
l
r
a
m
p
u
p
g
r
a
d
e
s
t
o
a
d
d
t
o
t
h
e
scope. In addition, paving was coordinated to be complete d
a
t
n
i
g
h
t
t
o
m
i
n
i
m
i
z
e
t
r
a
f
f
i
c
c
o
n
g
e
s
t
i
o
n
.
DATE: 06/2012-09/2012
uPgraDe leFt turn Phases FlashIng yellow arrow sIgnal-7 locatIons, rancho cucamonga Chris served the City of Rancho Cucamonga in providin
g
c
o
n
s
t
r
u
c
t
i
o
n
i
n
s
p
e
c
i
t
i
o
n
s
e
r
v
i
c
e
s
f
o
r
t
h
e
p
u
r
p
o
s
e
o
f
upgrading left turns on this project. The work entailed remo v
i
n
g
a
n
d
r
e
p
l
a
c
i
n
g
t
h
e
e
x
i
s
t
i
n
g
l
e
f
t
t
u
r
n
s
i
g
n
a
l
t
o
f
l
a
s
h
i
n
g
yellow arrow at 7 locations (4 on Day Creek Blvd. and 3 on Ba s
e
L
i
n
e
R
d
.
)
,
a
s
w
e
l
l
a
s
m
o
d
i
f
y
i
n
g
e
x
i
s
t
i
n
g
m
e
d
i
a
n
s
a
t
B
a
s
e
Line and Spruce (westbound left), Day Creek and Victoria Pa r
k
(
n
o
r
t
h
b
o
u
n
d
a
n
d
s
o
u
t
h
b
o
u
n
d
l
e
f
t
)
,
a
n
d
D
a
y
C
r
e
e
k
a
n
d
Silverberry (northbound and southbound left). The media n
m
o
d
i
f
i
c
a
t
i
o
n
s
i
n
c
l
u
d
e
4 ’
s
h
i
f
t
s
t
o
i
n
c
r
e
a
s
e
a
n
d
i
m
p
r
o
v
e
sight distance. This project also included replacing the con t
r
o
l
l
e
r
,
a
n
d
m
i
n
o
r
p
a
v
i
n
g
a
n
d
s
t
r
i
p
i
n
g
.
DATE: 2021vineyarD avenue at san bernarDino roaD traFFic signal moDiFication, rancho cucamonga Chris provided construction inspection services on this pr o
j
e
c
t
i
n
t
h
e
C
i
t
y
o
f
R
a
n
c
h
o
C
u
c
a
m
o
n
g
a
,
w
h
i
c
h
e
n
t
a
i
l
e
d
traffic signal modifications at the intersection of Vineyard A
v
e
n
u
e
a
n
d
S
a
n
B
e
r
n
a
r
d
i
n
o
R
o
a
d
f
o
r
r
e
m
o
v
i
n
g
t
h
r
e
e
p
u
l
l
boxes, abandoning existing footing, removing and salvagi n
g
e
x
i
s
t
i
n
g
s
i
g
n
a
l
c
a
b
i
n
e
t
a
n
d
r
e
l
o
c
a
t
i
n
g
t
r
a
f
f
i
c
s
i
g
n
a
l
equipment into new cabinet, furnishing and installing one T
y
p
e
1 -
A
p
o
l
e
a
n
d
4 ”
P
V
C
c
o
n
d
u
i
t
,
i
n
s
t
a
l
l
i
n
g
t
h
r
e
e
#
6 p
u
l
l
boxes, one #6E pull box, and one N40 pull box, furnishing a n
d
i
n
s
t
a
l
l
i
n
g
E
c
o
n
o
l
i
t
e
C
o
b
a
l
t
A
T
C
C
o
n
t
r
o
l
l
e
r
,
T
y
p
e
R
s
i
g
n
a
l
controller cabinet with new foundation, side mounted CBS-1 2 7
c
a
b
i
n
e
t
s
h
e
l
l
,
a
n
d
i
n
s
t
a
l
l
i
n
g
T
o
m
a
r
E
m
e
r
g
e
n
c
y
V
e
h
i
c
l
e
Preemption Detector and cabling. The Contractor was als o
t
a
s
k
e
d
w
i
t
h
r
e
p
l
a
c
i
n
g
e
x
i
s
t
i
n
g
i
n
c
a
n
d
e
s
c
e
n
t
l
i
g
h
t
s
w
i
t
h
new LED signal indicators, pulling new wires, potholing, and
t
r
a
f
f
i
c
c
o
n
t
r
o
l
.
DATE: 2020
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-143-
J
, L
jorge roque
constructIon InsPector
44 yearS of exPerience3
yearS witH Firm
FielDs oF exPertise:
ASPHALT RESIDENTIAL PAVEMENT CALTRANS RETAIN WALL
qualIFIcatIons
bs Civil Engineering, Instituto Tecnologico Centro Americano, El Salvador backgrounD
Jorge Roque has more than 44 years of experience in overseeing the design and engineering of street and highway improvement projects. As a Public Works Associate, he has managed Capital Improvement Projects for 14 years. In this time, Jorge supervised inspectors and managed project progress to ensure compliance with project quality assurance procedures. He prepared plans and specification for street and infrastructure improvements according to Public Works Standards. As a Permit Department Manager, Jorge performed work, calculating fees, and establishing permit conditions according to scope of work. Jorge additionally performed plan checking and reviews involving plans for street improvements, water main and sewer improvements, along with grading, calculated checks on grading, infrastructure, and roadway improvements projects.
exPerIence
resiDential storm Drain & sewer line Installation, montebello Jorge served as the construction inspector for the City of Montebello on the Storm Drain and Sewer Line Installation Project. The project involved constructing 5,000 LF of sewer line and manholes along with 4,500 LF of 48” diameter corrugated storm drain pipe, 22 catch basins, and head walls for inlets and outlets with grouted 12” diameter rip rap rocks. This project was a part of a 1,200 residential unit (600 acres) construction effort within the City of Montebello in Montebello Hills, located east of Montebello Boulevard, from Michael Collins to San Gabriel Boulevard. In addition to verifying on-site safety, Jorge also observed and documented all aspects of the construction, including conducting inspections on required trench layout work, material allocation, pipe bedding, pipe laying, shoring, catch basins and pipes inverts that were also closely verified by the Surveyor, to make sure the work was in accordance with the plans and specifications. DATE: 2023
montebello boulevarD bike lane & siDewalk imProvement, montebello Jorge served as construction inspector on the Montebello Boulevard Bike Lane and Sidewalk Improvement Project for the City of Montebello. The project limits were approximate 1.3 miles, from Lincoln Avenue to Paramount Boulevard.
Jefferson Avenue to Paramount Boulevard involved street widening which included adding a bike lane that required an excavation of approximately 8,000 cubic yards of dirt and the construction of 750 LF of a 5-ft. high retaining wall along the easterly side at the Costco Way intersection. This also invovled the construction of 2,500 LF of 12-inch diameter C900 PVC for reclaimed water, the construction of 6,000 LF of curb and gutter, 12,000 LF of a new raised median curb, 40, 000 square feet of sidewalk, along with upgrading 25 curb ramps for ADA compliance. A raised median was also installed, with a decorative river-rock dry stream as part of the percolation and storm water infiltration system at 22 locations, 18-in. wide decorative decomposed granite along the perimeter of medians with planting and drip irrigation system. Approximately 150 of 24” box trees were planted, along with 3,700 1-gallon trees and 5,500 SF of ground covers were also planted. Bus shelters were installed at two locations, and a reclaimed water line was constructed from Lincoln Avenue to Jefferson Avenue along with infrastructure, water line, gas line and streetlights relocations due to the street widening. Overall, approximately 500,000 SF of grind and overlay were ground and 10,000 tons of AC were installed. All of the surveying monuments were re-installed and recorded at the Los Angeles County surveying Department after paving. DATE: 2023
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -144-
/. /. —_H—_H
13.4; a; EAPEIUEIJCE
v A
~ ) =
l;...:. .h‘h. Fain]
Paving the way aram installation & imProvement at 60 streets, montebelloJorge served as construction inspector for the constructi o
n
o
f
t
h
i
s
A
R
A
M
I
n
s
t
a
l
l
a
t
i
o
n
P
r
o
j
e
c
t
f
o
r
6 0
s
t
r
e
e
t
s
i
n
t
h
e
City of Montebello. The project involved Micro Mill, Skin Pa t
c
h
,
C
r
a
c
k
S
e
a
l
,
A
s
p
h
a
l
t
R
u
b
b
e
r
A
g
g
r
e
g
a
t
e
M
e
m
b
r
a
n
e
,
Hot Mix Asphalt Paving, Utilities Adjustments to new gr a
d
e
,
a
n
d
s
t
r
i
p
i
n
g
a
n
d
m
a
r
k
i
n
g
s
.
J
o
r
g
e
’
s
t
a
s
k
s
i
n
c
l
u
d
e
d
inspection following micro milling to determine the areas w h
e
r
e
s
k
i
n
p
a
t
c
h
a
n
d
c
r
a
c
k
s
e
a
l
s
w
e
r
e
r
e
q
u
i
r
e
d
b
e
f
o
r
e
t
h
e
ARAM (Asphalt Rubber Aggregate Membrane) application.
A
f
t
e
r
t
h
e
A
R
A
M
,
t
h
e
c
o
n
t
r
a
c
t
o
r
i
n
s
t
a
l
l
e
d
R
e
c
y
c
l
e
d
h
o
t
m
i
x
asphalt paving. The 60 streets were resurfaced with the desi g
n
o
f
b
e
i
n
g
m
a
i
n
t
e
n
a
n
c
e
f
r
e
e
f
o
r
1 0
t
o
1 5
(
o
r
m
o
r
e
)
y
e
a
r
s
.
Jorge observed every aspect of construction and document e
d
l
a
b
o
r
a
n
d
m
a
t
e
r
i
a
l
a
l
l
o
c
a
t
i
o
n
s
.
DATE: 2017washington blvD. street ImProvements--Phase II, montebelloJorge served as the construction inspector for the constr u
c
t
i
o
n
o
f
t
h
i
s
f
e
d
e
r
a
l
c
o
n
t
r
a
c
t
c
o
m
p
l
i
a
n
t
m
a
j
o
r
a
r
t
e
r
i
a
l
roadway improvement and pavement rehabilitation of Washin g
t
o
n
B
o
u
l
e
v
a
r
d
,
f
r
o
m
t
h
e
e
a
s
t
C
i
t
y
l
i
m
i
t
t
o
t
h
e
w
e
s
t
C
i
t
y
limit in the City of Montebello. The project consisted of pave m
e
n
t
r
e
h
a
b
i
l
i
t
a
t
i
o
n
,
n
e
w
l
a
n
d
s
c
a
p
e
d
m
e
d
i
a
n
i
s
l
a
n
d
s
,
a
C
i
t
y
monument sign, bus pads, ADA improvements, sidewalk and c
u
r
b
a
n
d
g
u
t
t
e
r
i
m
p
r
o
v
e
m
e
n
t
s
.
A
l
s
o
i
n
c
l
u
d
e
d
w
e
r
e
r
o
a
d
w
a
y
safety improvements and signing and striping. A pavement a n
a
l
y
s
i
s
w
a
s
c
o
n
d
u
c
t
e
d
,
a
l
o
n
g
w
i
t
h
a
l
t
e
r
n
a
t
e
r
e
h
a
b
i
l
i
t
a
t
i
o
n
strategies which included a budget analysis to complete a
s
m
u
c
h
o
f
t
h
e
s
t
r
e
e
t
i
m
p
r
o
v
e
m
e
n
t
s
a
s
t
h
e
f
i
x
e
d
p
r
o
j
e
c
t
budget would allow. Jorge was responsible for Notice-to-Pr o
c
e
e
d
i
s
s
u
a
n
c
e
,
r
e
v
i
e
w
o
f
c
h
a
n
g
e
o
r
d
e
r
s
a
n
d
p
r
o
g
r
e
s
s
payments, as well as overseeing compliance with the project’ s
p
l
a
n
s
a
n
d
s
p
e
c
i
f
i
c
a
t
i
o
n
s
,
a
l
o
n
g
w
i
t
h
c
o
m
p
l
i
a
n
c
e
w
i
t
h
t
h
e
City’s requirements and ordinances (hours of work, noise ordi n
a
n
c
e
,
e
t
c
.
)
.
J
o
r
g
e
a
l
s
o
o
v
e
r
s
a
w
t
h
e
g
e
n
e
r
a
l
p
e
r
f
o
r
m
a
n
c
e
of the Contractor, provided daily inspection reports and c l
e
a
r
l
y
i
d
e
n
t
i
f
i
e
d
t
h
e
d
a
i
l
y
a
c
t
i
v
i
t
i
e
s
,
w
o
r
k
a
c
c
o
m
p
l
i
s
h
e
d
,
number of employees and equipment on the job, and issues a
n
d
c
o
n
c
e
r
n
s
d
u
r
i
n
g
t
h
e
p
r
o
j
e
c
t
.
DATE: 2019bluFF roaD imProvement Project montebelloJorge provided construction inspection services to the Cit y
o
f
M
o
n
t
e
b
e
l
l
o
o
n
t
h
e
B
l
u
f
f
R
o
a
d
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
.
The project limits were from Sycamore Street to Oakwood S
t
r
e
e
t
.
J
o
r
g
e
i
n
s
p
e
c
t
e
d
c
o
m
p
l
i
a
n
c
e
w
i
t
h
t
h
e
p
l
a
n
s
a
n
d
specifications of the contract, oversaw traffic control, and p
r
o
v
i
d
e
d
d
a
i
l
y
l
o
g
a
n
d
i
n
s
p
e
c
t
i
o
n
r
e
p
o
r
t
e
n
t
r
i
e
s
,
i
n
c
l
u
d
i
n
g
pictures of the project. Jorge also reviewed and reporte d
c
o
n
t
r
a
c
t
o
r
c
l
a
i
m
s
,
p
r
e
p
a
r
e
d
w
e
e
k
l
y
u
p
d
a
t
e
r
e
p
o
r
t
s
,
reviewed the contractor’s invoices, verified completed wo r
k
,
a
n
d
a
p
p
r
o
v
e
d
a
l
l
q
u
a
n
t
i
t
i
e
s
.
T
h
i
s
p
r
o
j
e
c
t
i
n
c
l
u
d
e
d
t
h
e
removal and replacement of broken concrete sidewalk, re c
o
n
s
t
r
u
c
t
i
o
n
o
f
c
u
r
b
a
n
d
g
u
t
t
e
r
s
,
a
n
u
p
g
r
a
d
e
o
f
6 c
u
r
b
ramps to comply with ADA requirements, the removal and r e
p
l
a
c
e
m
e
n
t
o
f
1 0
0 L
F
o
f
m
e
t
a
l
b
e
a
m
g
u
a
r
d
r
a
i
l
i
n
g
,
d
i
g
o
u
t
s
on asphalt cold milling of existing 2-in.-deep asphalt and inst a
l
l
i
n
g
2 i
n
c
h
e
s
o
f
a
s
p
h
a
l
t
w
h
e
r
e
a
p
p
r
o
x
i
m
a
t
e
l
y
1 ,
1 0
0 t
o
n
s
of asphalt were being installed. The project also included t h
e
a
d
j
u
s
t
m
e
n
t
o
f
u
t
i
l
i
t
y
c
o
v
e
r
s
,
t
r
a
f
f
i
c
s
t
r
i
p
i
n
g
,
p
a
v
e
m
e
n
t
markings and curb painting. DATE: 2021
ellingbrook Drive imProvement Project, montebelloJorge provided construction inspection services to the Ci t
y
o
f
M
o
n
t
e
b
e
l
l
o
o
n
t
h
e
E
l
l
i
n
g
b
r
o
o
k
D
r
i
v
e
I
m
p
r
o
v
e
m
e
n
t
Project. The project limits were from Firvale Avenue to the e a
s
t
e
r
l
y
e
n
d
o
f
t
h
e
c
u
l
d
e
s
a
c
.
J
o
r
g
e
p
r
o
v
i
d
e
d
c
o
m
p
l
i
a
n
c
e
with the plans and specifications of the contract, along w
i
t
h
o
v
e
r
s
e
e
i
n
g
t
r
a
f
f
i
c
c
o
n
t
r
o
l
,
a
n
d
p
r
o
v
i
d
e
d
d
a
i
l
y
l
o
g
and inspection report entries, including pictures of the p
r
o
j
e
c
t
.
J
o
r
g
e
a
l
s
o
r
e
v
i
e
w
e
d
a
n
d
r
e
p
o
r
t
e
d
c
o
n
t
r
a
c
t
o
r
claims, prepared weekly update reports, reviewed contrac t
o
r
’
s
i
n
v
o
i
c
e
s
,
v
e
r
i
f
i
e
d
c
o
m
p
l
e
t
e
d
w
o
r
k
,
a
n
d
a
p
p
r
o
v
e
d
a
l
l
quantities allocated. This project included the removal and r
e
p
l
a
c
e
m
e
n
t
o
f
b
r
o
k
e
n
3 ,
5 0
0 S
F
o
f
s
i
d
e
w
a
l
k
,
r
e
m
o
v
a
l
a
n
d
replacement of 900 SF of driveways, reconstruction of 220 L
F
o
f
c
u
r
b
a
n
d
g
u
t
t
e
r
s
,
u
p
g
r
a
d
i
n
g
1 2
c
u
r
b
r
a
m
p
s
t
o
c
o
m
p
l
y
with ADA requirements, 84,000 SF of asphalt, cold milling 2-i n
.
-
d
e
e
p
a
s
p
h
a
l
t
a
n
d
i
n
s
t
a
l
l
i
n
g
2 i
n
c
h
e
s
o
f
a
s
p
h
a
l
t
w
h
e
r
e
approximate 1,250 tons of asphalt were installed. Jorge als o
o
v
e
r
s
a
w
t
h
e
a
d
j
u
s
t
i
n
g
o
f
u
t
i
l
i
t
y
c
o
v
e
r
s
,
t
r
a
f
f
i
c
s
t
r
i
p
i
n
g
,
pavement markings and curb painting. DATE: 2021
maPle avenue imProvement Project, montebelloJorge provided construction inspection services to the City o
f
M
o
n
t
e
b
e
l
l
o
o
n
t
h
e
M
a
p
l
e
A
v
e
n
u
e
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
.
The project limits were from Washington Boulevard to Mine s
A
v
e
n
u
e
a
l
o
n
g
M
a
p
l
e
A
v
e
n
u
e
.
T
h
i
s
p
r
o
j
e
c
t
i
n
c
l
u
d
e
d
t
h
e
removal and replacement of broken sidewalk, driveways, re c
o
n
s
t
r
u
c
t
i
o
n
o
f
c
u
r
b
a
n
d
g
u
t
t
e
r
s
,
u
p
g
r
a
d
i
n
g
A
D
A
c
u
r
b
ramps to compliance, cross gutters removal and replacem e
n
t
,
a
n
d
a
s
p
h
a
l
t
c
o
l
d
m
i
l
l
i
n
g
o
f
2 -
i
n
c
h
-
d
e
e
p
a
s
p
h
a
l
t
a
n
d
installing 2 inches of asphalt. Jorge provided compliance w
i
t
h
p
l
a
n
s
a
n
d
s
p
e
c
i
f
i
c
a
t
i
o
n
s
o
f
t
h
e
c
o
n
t
r
a
c
t
,
a
s
w
e
l
l
a
s
overseeing traffic control, and he provided daily log and ins p
e
c
t
i
o
n
r
e
p
o
r
t
e
n
t
r
i
e
s
,
i
n
c
l
u
d
i
n
g
p
i
c
t
u
r
e
s
o
f
t
h
e
p
r
o
j
e
c
t
.
Jorge also reviewed and reported contractor claims, prepar e
d
w
e
e
k
l
y
u
p
d
a
t
e
r
e
p
o
r
t
s
,
r
e
v
i
e
w
e
d
c
o
n
t
r
a
c
t
o
r
’
s
i
n
v
o
i
c
e
s
,
verified completed work, and approved all quantities alloca t
e
d
.
J
o
r
g
e
a
d
d
i
t
i
o
n
a
l
l
y
i
n
s
p
e
c
t
e
d
t
h
e
a
d
j
u
s
t
i
n
g
o
f
u
t
i
l
i
t
y
covers, traffic striping and markings, pavement markings an d
c
u
r
b
p
a
i
n
t
i
n
g
.
DATE: 2016
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-145-
J
, L
ruben rocHa, aci
construction insPector
17 yearS of exPerience7
yearS witH Firm
FielDs oF exPertise:
ROADWAY
ASPHALT
PAVEMENT
CALTRANS
WIDENING
qualIFIcatIons
coursework: General Education, Business and Management, Mt. San Jacinto College, Menifee, 2006 • certIFIeD: General Construction Inspector; Traffic Signal Inspector; ADA Curb Ramp Inspecton; Nuclear Gauge • acI certIFIeD: Field Technician Level I; Aggregate Testing Lab Technician Level I; Trenching & Excavation Awareness • osha certIFIeD: 40 hour Hazwoper; 10-Hour Safety Training; Confined Space Safety in Construction • caltrans certIFIeD: D125: Sampling Highway Materials/Products; 216 & 231: Relative Compaction, Soils & Aggregates (Nuclear); 504: Air Content, Freshly Mixed Concrete, & Pressure; 518: Density of Fresh Concrete; 523 & 524: Method of Test for Flexural Strength of Concrete & Rapid Set Concrete; 533:
Ball Penetration in Fresh Portland Cement Concrete; 539: Sampling Freshly Fixed Concrete; 540: PCC Cylinder Fabrication; 552: Method of Test for Relative Compaction of Polymer Concrete with Nuclear Gages; 556 & 557:
Slump & Temperature of Freshly Mixed Cement Concrete.
backgrounD
Ruben Rocha has over 17 years of experience as a construction inspector as both a Lead inspector and Materials Inspector and technician, with work relating to large large rail, civil and structural transportation projects. His experience on this work involved interpreting and implementing construction plans, compliance with local, State and Federal regulations, ensuring the quality and functionality of concrete and earthwork for road and bridge structures, and he has performed inspections for ADA compliance, piers, reinforcing steel, pier caps, coping for MSE wall, abutments and decks. Ruben has supervised site activities to procure quality deliverables, on time and within budget, and he has performed routine inspections for compliance with regulatory agencies (Caltrans, FDOT & ODOT) to ensure structures met project specifications. Ruben has been responsible for coordinating material testing and performing field inspections, and overseeing conformance of construction work and materials to generally accepted engineering practices and principles, contract documents, geotechnical (soils) reports, and construction plans and specifications. Ruben works well with complex information and can establish and maintain a cooperative and effective working relationship with construction management teams, clients, and the public. exPerIence
route 47 geralD DesmonD briDge rePlacement, long beach
Ruben served as construction inspector on the Route 47 Gerald Desmond Bridge Replacement Project for the City of Long Beach. The project purpose was to replace the existing Gerald Desmond Bridge, connecting Route 710 to Terminal Island, in order to provide sufficient roadway capacity to accommodate current and future traffic demand, reduce approach grades, provide a structurally sound and seismically resistant bridge, and provide vertical clearance that would allow for existing container ships and new-generation vessels currently being constructed to pass through the Back Channel. Rubens tasks involved the review of the construction plans, provide oversight of concrete testing that included procurement of cylinders, slump, and air content field tests, maintain daily inspector reports and material quantity records through out the construction stages, monitor the construction schedule over the course of construction, and verify that all deliveries had accurate tickets and were from approved suppliers. Ruben additionally reviewed the accuracy of the reported concrete and asphalt yields, issued notices to the Contractor, recorded time and materials in case of disputed work, lead discussions with local homeowners to resolve their
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-146-
j—
] é % 9 $ @
1;...» .mn LR“!
concerns, reviewed plans for sewer systems and expans
i
o
n
s
,
s
e
r
v
e
d
a
s
a
l
i
a
i
s
o
n
b
e
t
w
e
e
n
t
h
e
m
u
n
i
c
i
p
a
l
c
l
i
e
n
t
,
engineers, and contractors, examined road and utility repai r
s
c
o
m
p
l
e
t
e
d
b
y
t
h
e
c
o
n
t
r
a
c
t
o
r
a
n
d
u
t
i
l
i
t
y
c
o
m
p
a
n
y
f
o
r
compliance with the project plans and specifications, and e n
s
u
r
e
d
t
h
a
t
b
u
i
l
d
i
n
g
p
l
a
n
s
,
m
a
t
e
r
i
a
l
s
,
s
a
f
e
t
y
p
r
o
c
e
d
u
r
e
s
,
and other variables followed Federal, State, and local City c o
d
e
s
.
DATE: 2021
street enhancement Project, huntington ParkRuben provided Lead Construction Inspector services to t h
e
C
i
t
y
o
f
H
u
n
t
i
n
g
t
o
n
P
a
r
k
o
n
t
h
e
S
t
r
e
e
t
E
n
h
a
n
c
e
m
e
n
t
Project. The scope of work included construction improv e
m
e
n
t
s
o
f
d
a
m
a
g
e
d
,
l
i
f
t
e
d
,
b
r
o
k
e
n
,
a
n
d
r
a
i
s
e
d
c
u
r
b
s
,
gutters, and cross gutters, the removal and replacemen
t
o
f
n
o
n
-
c
o
m
p
l
i
a
n
t
A
D
A
p
e
d
e
s
t
r
i
a
n
r
a
m
p
s
,
a
d
j
u
s
t
m
e
n
t
of existing utilities to finish grade, pavement markings a
n
d
s
t
r
i
p
i
n
g
a
n
d
s
i
g
n
a
g
e
,
i
s
o
l
a
t
e
d
a
r
e
a
s
o
f
r
o
a
d
w
a
y
structural section repair, asphalt concrete pavement grind i
n
g
,
a
n
d
o
v
e
r
l
a
y
.
R
u
b
e
n
c
o
o
r
d
i
n
a
t
e
d
s
c
h
e
d
u
l
e
s
f
o
r
t
r
a
d
e
subcontractors to obtain a smooth and adequate workflo
w
.
I
n
a
d
d
i
t
i
o
n
,
h
e
c
o
n
d
u
c
t
e
d
o
n
g
o
i
n
g
i
n
s
p
e
c
t
i
o
n
s
o
f
t
h
e
work-in-process to ensure that the final product met drawi n
g
s
a
n
d
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
H
e
a
l
s
o
r
e
v
i
e
w
e
d
,
i
n
s
p
e
c
t
e
d
a
n
d
approved traffic control systems in accordance with Caltran s
a
n
d
C
i
t
y
s
t
a
n
d
a
r
d
s
a
n
d
r
e
q
u
i
r
e
m
e
n
t
s
,
a
n
d
h
e
a
s
s
i
s
t
e
d
the Resident Engineer in all aspects of field work for the p r
o
j
e
c
t
i
n
c
l
u
d
i
n
g
:
i
n
s
p
e
c
t
i
o
n
o
f
c
o
n
s
t
r
u
c
t
i
o
n
o
p
e
r
a
t
i
o
n
s
,
along with conducting field labor compliance interviews. Ru b
e
n
p
r
o
v
i
d
e
d
s
u
p
p
o
r
t
w
i
t
h
t
h
e
c
o
n
t
r
a
c
t
c
h
a
n
g
e
o
r
d
e
r
s
,
tracked weekly statements of working days, prepared ser v
i
c
e
c
o
n
t
r
a
c
t
d
o
c
u
m
e
n
t
s
,
k
e
p
t
l
o
g
s
f
o
r
s
u
b
m
i
t
t
a
l
s
,
R
F
I
s
,
RFCs, and RFQs, review extra work bills submitted by contrac t
o
r
s
,
a
n
d
m
o
r
e
.
T
h
e
p
r
o
j
e
c
t
c
o
s
t
w
a
s
a
p
p
r
o
x
i
m
a
t
e
l
y
$
2 .
1 million. DATE: 10/2020-05/2021
hawthorne & Pch water main rePlacement Project, torranceRuben served as the Water Main Construction Lead Inspec t
o
r
o
n
t
h
e
H
a
w
t
h
o
r
n
e
a
n
d
P
C
H
W
a
t
e
r
M
a
i
n
R
e
p
l
a
c
e
m
e
n
t
Project for the City of Torrance. The project had an estimate d
b
u
d
g
e
t
o
f
$
1 m
i
l
l
i
o
n
.
R
u
b
e
n
p
r
o
v
i
d
e
d
i
n
s
p
e
c
t
i
o
n
s
f
o
r
t
h
e
replacement of existing potable water mains including valv e
s
,
f
i
r
e
h
y
d
r
a
n
t
s
,
a
n
d
s
e
r
v
i
c
e
c
o
n
n
e
c
t
i
o
n
s
w
h
e
r
e
h
e
w
a
s
responsible for ensuring all work activities were within com p
l
i
a
n
c
e
w
i
t
h
t
h
e
p
l
a
n
s
a
n
d
s
p
e
c
i
f
i
c
a
t
i
o
n
s
o
f
t
h
e
p
r
o
j
e
c
t
.
He also provided inspection of traffic control, demolition, t
r
e
n
c
h
e
x
c
a
v
a
t
i
o
n
,
p
i
p
e
l
a
y
i
n
g
,
s
i
d
e
w
a
l
k
r
e
c
o
n
s
t
r
u
c
t
i
o
n
,
streetlights, and traffic signal systems. In addition, Rube n
c
o
o
r
d
i
n
a
t
e
d
w
i
t
h
t
h
e
C
o
n
t
r
a
c
t
o
r
s
,
C
i
t
y
o
f
T
o
r
r
a
n
c
e
personnel, utility companies, surveyors, and stakeholders,
a
n
d
h
e
d
o
c
u
m
e
n
t
e
d
a
l
l
a
c
t
i
v
i
t
y
i
n
d
a
i
l
y
l
o
g
s
,
m
a
i
n
t
a
i
n
e
d
photo records, and recorded all relevant data such as m a
t
e
r
i
a
l
q
u
a
n
t
i
t
i
e
s
t
o
t
h
e
C
i
t
y
’
s
P
r
o
j
e
c
t
M
a
n
a
g
e
r
.
DATE: 01/2020-08/2020
miD-coast trolly Project, san DiegoRuben was the Construction Inspector and Material Tester o
n
t
h
e
C
i
t
y
o
f
S
a
n
D
i
e
g
o
’
s
M
i
d
-
C
o
a
s
t
T
r
o
l
l
y
P
r
o
j
e
c
t
.
T
h
e
Mid-Coast Trolley extended the Blue Line Trolley service f r
o
m
t
h
e
S
a
n
t
a
F
e
D
e
p
o
t
i
n
D
o
w
n
t
o
w
n
S
a
n
D
i
e
g
o
t
o
t
h
e
University City community, serving major activity centers s
u
c
h
a
s
O
l
d
T
o
w
n
,
U
C
S
a
n
D
i
e
g
o
,
a
n
d
W
e
s
t
f
i
e
l
d
U
T
C
.
O
n
this project, Ruben coordinated schedules for trade subco n
t
r
a
c
t
o
r
s
t
o
o
b
t
a
i
n
a
s
m
o
o
t
h
a
n
d
a
d
e
q
u
a
t
e
w
o
r
k
f
l
o
w
.
I
n
addition, he conducted an ongoing inspection of work-in-p r
o
c
e
s
s
t
o
e
n
s
u
r
e
t
h
a
t
t
h
e
f
i
n
a
l
p
r
o
d
u
c
t
m
e
t
d
r
a
w
i
n
g
s
a
n
d
specifications. Ruben also reviewed, inspected and approv e
d
t
r
a
f
f
i
c
c
o
n
t
r
o
l
s
y
s
t
e
m
s
i
n
a
c
c
o
r
d
a
n
c
e
w
i
t
h
C
a
l
t
r
a
n
s
standards and requirements, and he assist the Resident En g
i
n
e
e
r
i
n
a
l
l
a
s
p
e
c
t
s
o
f
f
i
e
l
d
w
o
r
k
f
o
r
t
h
e
p
r
o
j
e
c
t
i
n
c
l
u
d
i
n
g
:
inspection of nonstructural construction operations, chang e
o
r
d
e
r
p
r
e
p
a
r
a
t
i
o
n
,
e
t
c
.
T
h
e
p
r
o
j
e
c
t
h
a
d
a
n
a
p
p
r
o
x
i
m
a
t
e
cost of $2.1 billion. DATE: 02/2018-05/2019
caltrans District 8 on-call For highways 10, 61, 15/91, 60, 138 & 58, riversiDe county Ruben served as the Roadway Construction Inspector on t h
i
s
C
a
l
t
r
a
n
s
p
r
o
j
e
c
t
f
o
r
t
h
e
C
o
u
n
t
y
o
f
R
i
v
e
r
s
i
d
e
.
R
u
b
e
n
provided multiple services for the various Caltrans projects i n
D
i
s
t
r
i
c
t
8 ,
i
n
c
l
u
d
i
n
g
i
n
s
p
e
c
t
i
o
n
s
o
f
r
e
l
a
t
i
v
e
c
o
m
p
a
c
t
i
o
n
tests, soil and asphalt sampling, the preparation of de t
a
i
l
e
d
d
a
i
l
y
r
e
p
o
r
t
s
,
q
u
a
n
t
i
t
y
e
s
t
i
m
a
t
e
s
,
a
n
d
r
e
v
i
e
w
i
n
g
contractor’s invoices. Alongside this, Ruben provided highw a
y
i
n
s
p
e
c
t
i
o
n
,
c
o
n
c
r
e
t
e
p
a
v
e
m
e
n
t
r
e
p
l
a
c
e
m
e
n
t
,
s
h
o
u
l
d
e
r
widening, concrete panels profiling, panels joint seal, e m
e
r
g
e
n
c
y
s
t
o
r
m
d
a
m
a
g
e
r
e
p
a
i
r
s
,
h
i
g
h
w
a
y
r
e
h
a
b
i
l
i
t
a
t
i
o
n
,
grinding, asphalt concrete paving, striping, earthwork, CI D
H
p
i
l
i
n
g
,
r
e
i
n
f
o
r
c
i
n
g
f
a
b
r
i
c
s
,
d
r
a
i
n
a
g
e
i
m
p
r
o
v
e
m
e
n
t
s
,
signal and lighting work, installation of concrete barriers, t r
a
f
f
i
c
c
o
n
t
r
o
l
s
y
s
t
e
m
,
u
t
i
l
i
t
y
r
e
l
o
c
a
t
i
o
n
a
n
d
c
o
o
r
d
i
n
a
t
i
o
n
,
report writing, record keeping, and cost analysis. Ruben als o
a
s
s
i
s
t
e
d
t
h
e
R
e
s
i
d
e
n
t
E
n
g
i
n
e
e
r
b
y
p
r
o
v
i
d
i
n
g
i
n
-
p
r
o
j
e
c
t
administration that included coordination with the contract o
r
s
,
C
i
t
i
e
s
,
e
n
v
i
r
o
n
m
e
n
t
a
l
a
n
d
p
u
b
l
i
c
a
g
e
n
c
i
e
s
,
a
n
d
c
l
a
i
m
analysis, and he attended, participated in, and documented a
l
l
p
r
o
j
e
c
t
r
e
l
a
t
e
d
m
e
e
t
i
n
g
s
w
h
i
l
e
k
e
e
p
i
n
g
a
c
c
u
r
a
t
e
d
a
i
l
y
project activity of records. DATE: 2018-2021
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
J
, L
timotHy Stanley
construction insPector
32 yearS of exPerience7
yearS witH Firm
FielDs oF exPertise:
ROADWAY
ASPHALT
CONCRETE PARK
RESIDENTIAL
qualIFIcatIons
caltrans certiFieD ctm-375: AC Pavement In-Place Density • ctm -201: Sample Preparation • ctm- 539: Concrete Sampling • CtM-533: Ball Penetration • coursework Public Works Inspector & Business Administration and Computer Technology
backgrounD
Tim is a Public Works Inspector with 32 years of experience working almost exclusively as a Public Works Inspector for a variety of cities including the cities of Anaheim, La Quinta, Murrieta, Mission Viejo, Fremont, and Hawthorne.
Tim’s experience includes projects of all sizes. His accuracy and efficiency in the field ensures a successful and well- documented project, from construction through closeout. Tim’s work will always include making sure that the jobsite is safe and that the contractor is efficient with his time. He has worked on community facilities, and roadway projects including traffic signal, storm drain, sewer and water projects. His experience and familiarity with Caltrans makes him a valuable addition to any Public Works Inspection team. exPerIence
InglewooD avenue & Flagler lane resurFacIng, reDonDo beach Tim provided Construction Inspection services to the City of Redondo Beach on the Inglewood Avenue and Flagler Lane Resurfacing Projects. The project limits are on Inglewood Avenue between Grant Avenue and 190th Street (3,800 linear feet) and on Flagler Lane from 190th Street to Beryl Street (1,060 linear feet) adjacent to the Dominguez Park and Redondo Beach Dog Park. The project includes asphalt and concrete removals, street resurfacing, driveway and alley approaches, cross gutter and spandrel construction, ADA curb ramp construction, utility adjustment, cross gutter replacement, slot paving, signing and striping, tree removal and installation, seal coating, traffic loop detector installation, and other items per plans and specifications. DATE: 2020 blackstone DeveloPment Project, brea
Tim served as inspector to the City of Brea on the Blackstone Development Project. Blackstone is a master planned community developed by Shea Homes and included approximately 100 acres of land situated in unincorporated Orange County just north of the Brea City Limits. The development was divided into six housing tracks that included single-family homes, apartments, and some high density affordable housing units. The project also included constructing a community recreation center and a dog park. Some of the housing track segments had been sold to other builders; namely, Standard Pacific, Jamboree Housing, and Advent Companies. Two communities were developed in this project: (1) Barcelo, which consists of forty-seven (47) single family detached homes, and (2) Contesa, which is made up of 100 high density housing units. Standard Pacific developed the Serano community consisting of one hundred fifty (150) high density units while Jamboree Housing and Advent Companies constructed ninety-seven (97) affordable apartments, having acquired funding through the American Recovery and Reinvestment Act (ARRA) funds. Following the completion of the project units, plans to grade and develop further up the ridge to the peak of the most northerly hillside range in Orange County with a panoramic view were underway. Tim was tasked with inspecting the roadway and all sewer and water systems that supply the new development, in accordance with the City of Brea standards, as well as inspecting and approving a new traffic signal being installed at the intersection of Valencia and Santa Fe. DATE: 2013
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -148-
i)\f‘) _., 5 @99 Q
arrow highway & lone hill avenue imProvement Project, san DimasTim was the inspector on the City of San Dimas’ Arrow High w
a
y
&
L
o
n
e
H
i
l
l
A
v
e
n
u
e
I
m
p
r
o
v
e
m
e
n
t
p
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
limits included the Arrow Highway and Lone Hill Avenue inte r
s
e
c
t
i
o
n
,
L
o
n
e
H
i
l
l
A
v
e
n
u
e
f
r
o
m
5 0
0 f
e
e
t
n
o
r
t
h
o
f
A
r
r
o
w
Highway to Cienega Avenue, and Gladstone Street from
M
o
n
t
e
V
i
s
t
a
A
v
e
n
u
e
t
o
S
a
n
D
i
m
a
s
A
v
e
n
u
e
.
T
h
e
s
c
o
p
e
o
f
work included 2,364 CY of excavation, removing 1,268 LF of c o
n
c
r
e
t
e
c
u
r
b
a
n
d
g
u
t
t
e
r
,
6 ,
2 2
9 S
F
o
f
c
o
n
c
r
e
t
e
s
i
d
e
w
a
l
k
,
and 965 LF of curb, constructing river rock cobble paving i
n
t
h
e
m
e
d
i
a
n
s
o
n
A
r
r
o
w
H
i
g
h
w
a
y
,
i
n
s
t
a
l
l
i
n
g
7 ,
2 9
9 t
o
n
s
of asphalt concrete pavement, constructing Class II aggre g
a
t
e
b
a
s
e
,
a
n
d
c
e
m
e
n
t
-
t
r
e
a
t
e
d
b
a
s
e
.
F
u
r
t
h
e
r
m
o
r
e
,
t
h
e
project entailed 10,332 SF of cold-milling to 2-inch depth o f
a
s
p
h
a
l
t
c
o
n
c
r
e
t
e
p
a
v
e
m
e
n
t
,
c
o
n
s
t
r
u
c
t
i
n
g
8 i
n
c
h
e
s
o
f
PCC curb and gutter, 6 inches of PCC curb and gutter,
a
c
o
m
m
e
r
c
i
a
l
d
r
i
v
e
w
a
y
,
5 -
f
o
o
t
-
w
i
d
e
P
C
C
s
i
d
e
w
a
l
k
,
a
n
d
1 2
curb ramps. In addition, the work involved adjusting the lan d
s
c
a
p
e
a
n
d
i
r
r
i
g
a
t
i
o
n
s
y
s
t
e
m
o
n
t
h
e
m
e
d
i
a
n
s
,
i
n
s
t
a
l
l
i
n
g
traffic signals on Arrow Highway at the Lone Hill intersect i
o
n
,
r
e
m
o
v
i
n
g
5 t
r
e
e
s
,
i
n
s
t
a
l
l
i
n
g
A
s
p
h
a
l
t
R
u
b
b
e
r
H
o
t
M
i
x
,
installing 31 traffic loops, adjusting water and gas valves a n
d
m
a
n
h
o
l
e
s
t
o
g
r
a
d
e
,
r
e
l
o
c
a
t
i
n
g
t
r
a
f
f
i
c
s
i
g
n
a
l
p
u
l
l
b
o
x
e
s
,
and installing a catch basin. DATE: 10/2014
crenshaw boulevarD reconstruction & lomita boulevarD resurFacing, lomitaTim was the Senior Inspector to the City of Lomita for the C
r
e
n
s
h
a
w
B
o
u
l
e
v
a
r
d
a
n
d
L
o
m
i
t
a
B
o
u
l
e
v
a
r
d
I
n
t
e
r
s
e
c
t
i
o
n
Reconstruction and Lomita Boulevard Resurfacing Project. T h
i
s
p
r
o
j
e
c
t
c
a
l
l
e
d
f
o
r
a
p
p
r
o
x
i
m
a
t
e
l
y
2 ,
3 2
5 c
u
b
i
c
y
a
r
d
s
o
f
reconstruction in the intersection of Crenshaw Boulevard a n
d
L
o
m
i
t
a
B
o
u
l
e
v
a
r
d
.
A
s
m
a
l
l
p
o
r
t
i
o
n
o
f
t
h
i
s
i
n
t
e
r
s
e
c
t
i
o
n
(west) was within the City of Torrance, so interagency coor d
i
n
a
t
i
o
n
w
a
s
e
s
s
e
n
t
i
a
l
.
T
h
i
s
p
r
o
j
e
c
t
i
n
v
o
l
v
e
d
r
e
s
u
r
f
a
c
i
n
g
on Crenshaw Boulevard in both directions, south (approxi m
a
t
e
l
y
1 ,
0 5
6 l
i
n
e
a
r
f
e
e
t
)
a
n
d
n
o
r
t
h
(
a
p
p
r
o
x
i
m
a
t
e
l
y
3 2
5 feet), and resurfacing on Lomita Boulevard from the Cre n
s
h
a
w
B
o
u
l
e
v
a
r
d
i
n
t
e
r
s
e
c
t
i
o
n
e
a
s
t
t
o
N
a
r
b
o
n
n
e
A
v
e
n
u
e
(around 2,700 feet). DATE: 02/2014
siDewalk rePair: hanDicaP accessibility - I-135, torranceTim provided inspection services on the Sidewalk Repair for
H
a
n
d
i
c
a
p
A
c
c
e
s
s
i
b
i
l
i
t
y
P
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
T
o
r
r
a
n
c
e
.
This project was CDBG funded and included 79,300 SF of
s
i
d
e
w
a
l
k
r
e
m
o
v
a
l
a
n
d
c
o
n
s
t
r
u
c
t
i
o
n
o
f
a
3 1
/
2 ”
t
h
i
c
k
P
C
C
sidewalk over 4” CMB, 5,300 LF of curb and gutter remova l
a
n
d
r
e
p
l
a
c
e
m
e
n
t
t
o
m
a
t
c
h
e
x
i
s
t
i
n
g
c
u
r
b
h
e
i
g
h
t
s
a
n
d
gutter widths, restoration of 1 ft. wide AC pavement, 10,90 0 S
F
o
f
d
r
i
v
e
w
a
y
r
e
p
l
a
c
e
m
e
n
t
a
n
d
c
o
n
s
t
r
u
c
t
i
n
g
4 ”
t
h
i
c
k
PCC driveway over 6” CMB, 180 LF of removing the existing c o
r
n
e
r
r
a
d
i
u
s
c
u
r
b
a
n
d
c
o
n
s
t
r
u
c
t
i
n
g
a
n
e
w
v
a
r
i
a
b
l
e
h
e
i
g
h
t
corner PCC curb. The project also entailed the removal of 11 ,
8 7
0 S
F
o
f
c
r
o
s
s
g
u
t
t
e
r
w
i
t
h
c
u
r
b
&
g
u
t
t
e
r
a
n
d
s
u
b
g
r
a
d
e
,
1,900 SF of pavement replacement, furnishing and installin g
2 8
5 p
a
r
k
w
a
y
t
r
e
e
s
,
a
n
d
3 1
0 l
o
c
a
t
i
o
n
s
o
f
r
o
o
t
p
r
u
n
i
n
g
.
Additionally, the work entailed periphery parkway impro v
e
m
e
n
t
s
a
n
d
1 0
d
e
t
e
c
t
a
b
l
e
w
a
r
n
i
n
g
s
u
r
f
a
c
e
p
a
n
e
l
s
a
t
access ramps. Furthermore, the scope of work involved inst a
l
l
i
n
g
a
l
a
n
d
s
c
a
p
i
n
g
a
n
d
i
r
r
i
g
a
t
i
o
n
s
y
s
t
e
m
,
r
e
m
o
v
i
n
g
a
n
d
replacing water meter utility covers, and pavement marking s
.
DATE: 2016
aDa accessibility ramPs - Phase III (cDbg FunDeD), PlacentiaTim provided inspection services for the City of Placentia.
T
h
e
p
r
o
j
e
c
t
c
a
l
l
e
d
f
o
r
r
e
m
o
v
i
n
g
a
n
d
c
o
n
s
t
r
u
c
t
i
n
g
s
i
x
t
y
-
six (66) ADA ramps, 14,000 SF of sidewalk, 1,600 LF of cu r
b
a
n
d
g
u
t
t
e
r
,
t
w
o
d
r
i
v
e
a
p
p
r
o
a
c
h
e
s
a
n
d
r
e
m
o
v
a
l
o
f
1 9
parkway trees. It was critical that the ramps be constructed i
n
c
o
m
p
l
i
a
n
c
e
w
i
t
h
c
u
r
r
e
n
t
A
m
e
r
i
c
a
n
s
w
i
t
h
D
i
s
a
b
i
l
i
t
y
A
c
t
standards and requirements. Furthermore, design services
i
n
c
l
u
d
e
d
a
s
i
t
e
a
s
s
e
s
s
m
e
n
t
a
n
d
f
i
e
l
d
g
a
t
h
e
r
i
n
g
d
a
t
a
f
o
r
each ramp location, a design analysis and preparation of th e
D
e
s
i
g
n
R
e
c
o
m
m
e
n
d
a
t
i
o
n
t
o
a
c
h
i
e
v
e
A
D
A
c
o
m
p
l
i
a
n
c
e
,
a
survey elevation for 20 identified locations, and the prepar a
t
i
o
n
o
f
t
h
e
p
r
o
j
e
c
t
s
p
e
c
i
f
i
c
a
t
i
o
n
s
.
T
h
e
p
r
o
j
e
c
t
r
e
q
u
i
r
e
d
working with the City staff to complete the construction
d
o
c
u
m
e
n
t
s
o
n
s
c
h
e
d
u
l
e
.
M
o
r
e
o
v
e
r
,
t
h
e
c
o
n
s
t
r
u
c
t
i
o
n
management and inspection phase included employee inte
r
v
i
e
w
s
,
r
e
v
i
e
w
i
n
g
c
e
r
t
i
f
i
e
d
p
a
y
r
o
l
l
s
,
c
h
e
c
k
i
n
g
a
l
l
g
r
a
d
e
s
,
and keeping the contractor on schedule and within budget f o
r
t
h
i
s
f
e
d
e
r
a
l
l
y
f
u
n
d
e
d
C
D
B
G
p
r
o
j
e
c
t
.
DATE: 03/2015la Floresta village DeveloPment Project, breaTim served as inspector to the City of Brea. The La Floresta
d
e
v
e
l
o
p
m
e
n
t
s
i
t
e
e
n
c
o
m
p
a
s
s
e
s
a
p
p
r
o
x
i
m
a
t
e
l
y
1 2
0 a
c
r
e
s
,
surrounded by Imperial Highway to the south, Valencia Avenue t
o
t
h
e
w
e
s
t
,
a
n
d
R
o
s
e
D
r
i
v
e
t
o
t
h
e
e
a
s
t
.
T
h
e
L
a
F
l
o
r
e
s
t
a
s
i
t
e
is a planned multi-use development, which includes single fam i
l
y
h
o
m
e
s
,
a
p
a
r
t
m
e
n
t
s
a
n
d
c
o
m
m
e
r
c
i
a
l
p
r
o
p
e
r
t
i
e
s
.
T
h
e
c
o
r
e
of the development site incorporated both residential and no n
-
r
e
s
i
d
e
n
t
i
a
l
c
o
m
p
o
n
e
n
t
s
.
T
h
e
r
e
s
i
d
e
n
t
i
a
l
p
r
o
d
u
c
t
t
y
p
e
s
vary, from 5.0 to 8.5 net dwelling units per acre, to 28.5 net d
w
e
l
l
i
n
g
u
n
i
t
s
p
e
r
a
c
r
e
.
T
h
e
c
o
r
n
e
r
o
f
V
a
l
e
n
c
i
a
A
v
e
n
u
e
a
n
d
Imperial Highway is designated for mostly non-residential us e
,
a
l
t
h
o
u
g
h
1 5
0 r
e
s
i
d
e
n
t
i
a
l
u
n
i
t
s
a
r
e
i
n
c
o
r
p
o
r
a
t
e
d
i
n
t
o
t
h
i
s
area. The La Floresta Village has 1,088 residential units, 156,8 0 0
S
F
o
f
m
i
x
e
d
u
s
e
c
o
m
m
e
r
c
i
a
l
l
a
n
d
,
a
n
d
5 4
a
c
r
e
s
d
e
v
o
t
e
d
to an active adult recreation center for residents. The La Flor e
s
t
a
V
i
l
l
a
g
e
i
s
p
a
r
t
o
f
a
p
l
a
n
t
o
b
u
i
l
d
a
c
o
m
m
u
n
i
t
y
w
h
e
r
e
residents can live, work, shop and play in a “small town” sett i
n
g
t
h
a
t
i
s
u
n
i
q
u
e
t
o
t
h
e
h
e
r
i
t
a
g
e
a
n
d
h
i
s
t
o
r
y
o
f
t
h
e
C
i
t
y
o
f
Brea. Inspection services included roadway, storm drain, sewe r
a
n
d
w
a
t
e
r
i
n
s
t
a
l
l
a
t
i
o
n
.
DATE: 2013
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-149-
J
, L
jeffery eaton, qSp
constructIon InsPector
35 yearS of exPerience3
yearS witH Firm
FielDs oF exPertise:
ROADWAY
RESIDENTIAL
PAVEMENT
SLURRY SEAL
DRAINAGE
qualIFIcatIons
qsP Qualified SWPPP Practitioner | 35 yrs. Public works construction The County of Orange as: construction management Santiago Canyon College | 3 yrs. stuDy & comPuter science California State University, Fullerton, ‘01-’04
backgrounD
Jeffrey Eaton is a long-time experienced and motivated construction inspector, having acquired successful employment with many reputable companies. Jeffrey has also recently obtained an AS degree in Construction Management from Santiago Canyon College. Jeffrey has accumulated 35 years of experience in public works construction for the County of Orang alone, with 11+ years of that in serving as a construction inspector for County Capital Improvement Projects, which called for encroachment permits, subdivisions, job order contracts, and Caltrans projects. Jeffrey has recently come out of retirement, having last served as a Senior Construction Inspector with a current certificate for Qualified SWPPP Practitioner (QSP). In his previous experience involving with public works projects, Jeffrey was involved in/responsible for testing and inspecting construction materials, performing geotechnical investigations, and pavement design and rehabilitation. exPerIence
Pavement analysis & investigations, santa ana
Jeffrey provided construction inspection services and supervised engineering technicians in the process of performing pavement analysis and investigations in the City of Santa Ana. Additional work for Jeffrey included performing the pavement analysis using ground penetrating radar and a falling weight deflectometer, and the design work for overlay thicknesses for the County’s resurfacing projects. Jeffrey also reviewed plans and specifications for The County Public Works Projects in which he wrote geotechnical and materials reports for the County geotechnical engineer, in which involved design work requiring compliance to The County Standard Plans and Greenbook Specifications. Further design work included traffic control plans using the MUTCD, and further geotechnical investigations involved field techniques such as drilling, site reconnaissance, and visual inspection. Lastly, Jeffrey assisted the geotechnical engineer and engineering geologist in inspecting the Seven Oaks Dam periodically, lending a geotechnical engineer point of view. DATE: 2021
roaDway rehabilitation Documentation & DraFt rePorting, santa ana Jeffrey was tasked with evaluating and analyzing designed road structural sections for rehabilitation, writing Materials Reports for geotechnical projects, subdivisions, and arterial highways, and writing street rehabilitation reports for County and City road projects. This included reports on strategies for rehabilitation, along with mapping removals and replacements, including measuring quantities. Jeffrey was also involved in the design and implementation of various computer applications and drafting boring logs, project exhibits, and maps. DATE: 2018 right-oF-way anD ProPerty Permits insPection, orange
Jeffrey provided construction inspection services on public works construction projects involving work in The County of Orange Right-of-Way and County Property Permits. This included inspecting various permits for homeowners, utility companies, developers, and businesses. Jeffrey also reviewed engineering plans for permit construction,
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-150-
13.4; a; 5111951151455
v )
which required the use of the County’s CPP system. Jeffrey
f
u
r
t
h
e
r
i
n
s
p
e
c
t
e
d
t
h
e
s
u
b
d
i
v
i
s
i
o
n
w
o
r
k
,
w
h
i
c
h
i
n
c
l
u
d
e
d
curb and gutter, sidewalk, paving, storm drain, catch basins ,
l
a
n
d
s
c
a
p
i
n
g
,
g
r
a
d
i
n
g
,
a
n
d
u
t
i
l
i
t
y
i
n
s
t
a
l
l
m
e
n
t
.
J
e
f
f
r
e
y
a
l
s
o
performed grading inspections in subdivision construction f
o
r
p
r
i
v
a
t
e
p
r
o
p
e
r
t
y
p
r
o
j
e
c
t
s
,
w
h
i
c
h
i
n
c
l
u
d
e
d
i
n
s
p
e
c
t
i
n
g
mass grading in subdivision, retaining walls, and building fou n
d
a
t
i
o
n
s
,
a
l
o
n
g
w
i
t
h
r
e
v
i
e
w
i
n
g
c
e
r
t
i
f
i
c
a
t
e
s
o
f
c
o
m
p
l
i
a
n
c
e
from engineers and contractors, and reviewing grading plans
a
n
d
g
e
o
t
e
c
h
n
i
c
a
l
r
e
p
o
r
t
s
.
J
e
f
f
r
e
y
m
a
d
e
s
u
r
e
t
o
p
e
r
f
o
r
m
the daily entries into the department’s APPS system. DATE: 2021 oso Parkway briDge at sr-241 caltrans Project, orangeJeffrey served as the Lead Construction Inspector on Oso
P
a
r
k
w
a
y
B
r
i
d
g
e
a
t
S
R
2 4
1 C
a
l
t
r
a
n
s
P
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
involved the inspection of temporary traffic control, pa v
i
n
g
,
g
r
a
d
i
n
g
,
s
t
o
r
m
d
r
a
i
n
,
t
r
a
f
f
i
c
s
i
g
n
a
l
s
,
s
t
r
i
p
i
n
g
,
p
o
s
t
construction BMP’s, temporary BMP’s, a concrete barrier, T h
e
M
i
d
w
e
s
t
G
u
a
r
d
r
a
i
l
S
y
s
t
e
m
,
o
v
e
r
h
e
a
d
s
i
g
n
s
t
r
u
c
t
u
r
e
s
,
roadside signs, toll road booth structure removal, toll plaz a
c
o
n
s
t
r
u
c
t
i
o
n
(
w
i
t
h
j
o
i
n
t
e
d
p
l
a
n
e
c
o
n
c
r
e
t
e
p
a
v
e
m
e
n
t
)
,
bridge pile driving, temporary soil nail shoring, bridge abu t
m
e
n
t
,
a
n
d
a
b
r
i
d
g
e
a
p
p
r
o
a
c
h
s
l
a
b
.
J
e
f
f
r
e
y
a
d
d
i
t
i
o
n
a
l
l
y
assisted the structure inspector for a bridge constructi o
n
i
n
s
p
e
c
t
i
o
n
.
O
t
h
e
r
t
a
s
k
s
J
e
f
f
r
e
y
p
e
r
f
o
r
m
e
d
i
n
c
l
u
d
e
d
writing daily inspection reports, preparing weekly statement
o
f
w
o
r
k
i
n
g
d
a
y
s
,
p
r
e
p
a
r
i
n
g
m
o
n
t
h
l
y
p
r
o
g
r
e
s
s
p
a
y
m
e
n
t
s
,
and reviewing submittals and RFI’s, along with reviewiing
e
x
t
r
a
w
o
r
k
b
i
l
l
s
,
a
n
d
m
a
i
n
t
a
i
n
i
n
g
a
p
r
o
f
e
s
s
i
o
n
a
l
w
o
r
k
i
n
g
relationship with the Resident Engineer, Structure Inspect o
r
,
C
a
l
t
r
a
n
s
P
e
r
m
i
t
C
o
o
r
d
i
n
a
t
o
r
,
T
r
a
n
s
p
o
r
t
a
t
i
o
n
C
o
r
r
i
d
o
r
Agency, Design Engineer, and the general public. DATE: 2020 ocPw caPital imProvement Projects, orangeJeffrey provided construction inspection services on Ca p
i
t
a
l
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
s
f
o
r
C
o
u
n
t
y
o
f
O
r
a
n
g
e
P
u
b
l
i
c
Works (OCPW) on work that included arterial highway con s
t
r
u
c
t
i
o
n
,
s
t
o
r
m
d
r
a
i
n
c
o
n
s
t
r
u
c
t
i
o
n
,
s
l
u
r
r
y
s
e
a
l
,
a
s
p
h
a
l
t
concrete overlay, landscaping, flood control construction,
a
n
d
s
t
r
u
c
t
u
r
a
l
c
o
n
c
r
e
t
e
.
P
a
r
t
o
f
J
e
f
f
r
e
y
’
s
t
a
s
k
s
r
e
q
u
i
r
e
d
the review of plans, special provisions, and estimates f o
r
v
a
r
i
o
u
s
t
y
p
e
s
o
f
p
r
o
j
e
c
t
s
,
w
r
i
t
i
n
g
c
o
n
t
r
a
c
t
c
h
a
n
g
e
orders, preparing progress payments with quantity calcula t
i
o
n
s
,
r
e
v
i
e
w
i
n
g
c
o
n
t
r
a
c
t
s
u
b
m
i
t
t
a
l
s
a
n
d
R
F
I
’
s
,
r
e
v
i
e
w
i
n
g
extra work bills, preparing weekly statement of working d a
y
s
,
a
n
d
p
r
o
d
u
c
i
n
g
d
a
i
l
y
i
n
s
p
e
c
t
i
o
n
r
e
p
o
r
t
s
.
J
e
f
f
r
e
y
a
l
s
o
conducted preconstruction meetings and weekly progress
m
e
e
t
i
n
g
s
,
a
l
o
n
g
w
i
t
h
i
n
s
p
e
c
t
i
n
g
J
o
b
O
r
d
e
r
C
o
n
t
r
a
c
t
i
n
g
maintenance projects, and performing NPDES compliance in s
p
e
c
t
i
o
n
s
o
n
a
l
l
p
r
o
j
e
c
t
s
.
DATE: 2020Dana Point harbor DreDging Project, Dana PointJeffrey provided construction inspection services as the L
e
a
d
i
n
s
p
e
c
t
o
r
o
n
t
h
e
D
a
n
a
P
o
i
n
t
H
a
r
b
o
r
D
r
e
d
g
i
n
g
P
r
o
j
e
c
t
in the City of Dana Point. The project required inspection wo r
k
o
n
d
r
e
d
g
i
n
g
w
i
t
h
i
n
D
a
n
a
P
o
i
n
t
H
a
r
b
o
r
,
t
h
e
i
n
s
t
a
l
l
a
t
i
o
n
and removal of temporary pipeline from the harbor to Capist r
a
n
o
B
e
a
c
h
f
o
r
s
e
d
i
m
e
n
t
d
e
p
o
s
i
t
,
t
h
e
g
r
a
d
i
n
g
o
f
d
r
e
d
g
e
d
material at Capistrano Beach and Baby Beach (DPH), coo
r
d
i
n
a
t
i
n
g
w
i
t
h
O
C
S
u
r
v
e
y
o
n
c
a
l
c
u
l
a
t
i
n
g
q
u
a
n
t
i
t
i
e
s
,
a
n
d
inspecting temporary BMP’s. DATE: 2016
Dana Point harbor Parking lot overlay Project, Dana PointJeffrey provided Lead Inspection services on the Dana Poi n
t
H
a
r
b
o
r
P
a
r
k
i
n
g
L
o
t
O
v
e
r
l
a
y
P
r
o
j
e
c
t
i
n
t
h
e
C
i
t
y
o
f
D
a
n
a
Point, which was a job order contract. The project involv e
e
d
p
a
v
e
m
e
n
t
a
n
d
c
u
r
b
r
e
m
o
v
a
l
a
n
d
r
e
p
l
a
c
e
m
e
n
t
,
A
C
overlay, striping, and temporary BMP’s. DATE: 2017
trabuco creek Project - Phase vII, irvineJeffrey provided Lead Inspection services on phase VII of t h
e
T
r
a
b
u
c
o
C
r
e
e
k
P
r
o
j
e
c
t
.
T
h
e
m
a
i
n
w
o
r
k
d
e
t
a
i
l
i
n
c
l
u
d
e
d
steel sheet pile installation (5,000+ LF), bike trail constructio n
,
C
M
U
w
a
l
l
s
,
d
o
w
n
d
r
a
i
n
,
a
n
d
a
c
a
b
l
e
f
e
n
c
e
.
DATE: 2019resiDential street rehabilitation Project, la habraJeffrey provided inspection services on the Residential
S
t
r
e
e
t
R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
i
n
t
h
e
C
i
t
y
o
f
L
a
H
a
b
r
a
.
The project consisted of rehabilitating approximately 23 2 ,
8 1
0 l
i
n
e
a
r
f
e
e
t
(
4 4
m
i
l
e
s
)
o
f
r
e
s
i
d
e
n
t
i
a
l
s
t
r
e
e
t
s
,
w
h
i
c
h
involved 7 zone segments within the City limits slated for
t
h
e
F
Y
1 9
-
2 0
F
i
s
c
a
l
Y
e
a
r
.
F
o
l
l
o
w
i
n
g
a
s
i
t
e
a
s
s
e
s
s
m
e
n
t
,
block cracking, alligator cracking, and potholing was obse r
v
e
d
a
t
v
a
r
i
o
u
s
f
r
e
q
u
e
n
c
i
e
s
t
h
r
o
u
g
h
o
u
t
t
h
e
s
e
g
m
e
n
t
e
d
areas. The resulting associated sub-tasks for this proj e
c
t
r
e
q
u
i
r
e
d
c
o
n
s
t
r
u
c
t
i
n
g
A
D
A
c
o
m
p
l
i
a
n
t
c
u
r
b
r
a
m
p
s
,
reconstructing damaged curb, gutter and cross-gutters
a
n
d
d
r
i
v
e
w
a
y
s
a
d
j
a
c
e
n
t
t
o
r
e
m
o
v
e
d
c
u
r
b
&
g
u
t
t
e
r
,
a
d
j
u
s
t
i
n
g
utility appurtenances, and striping. The construction inclu d
e
d
c
o
l
d
m
i
l
l
i
n
g
a
n
d
A
R
H
M
o
v
e
r
l
a
y
.
O
u
r
t
e
a
m
c
o
o
r
d
i
n
a
t
e
d
with the City to ensure that concurrent water main project s
l
o
c
a
t
e
d
w
i
t
h
i
n
t
h
e
s
a
m
e
z
o
n
i
n
g
s
e
g
m
e
n
t
s
a
s
t
h
e
s
t
r
e
e
t
rehabilitation program were properly integrated to minimize
r
e
d
u
n
d
a
n
c
i
e
s
i
n
t
h
e
c
o
n
s
t
r
u
c
t
i
o
n
a
c
t
i
v
i
t
i
e
s
.
DATE: 2020
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
J
, L
joe Z amarippa
construction insPector
30 yearS of exPerience9
yearS witH Firm
FielDs oF exPertise:
ROADWAY
ASPHALT
PAVEMENT
CALTRANS
WIDENING
qualIFIcatIons
certIFIeD: Public Works Construction Inspector, Santiago Canyon College backgrounD
Joe is a Public Works Inspector with 30 years of experience in construction as an Inspector. His typical duties have included providing daily construction reports, documenting labor and equipment on-site each day and hours worked; measuring, calculating, and recording all construction quantities, and taking work and site photos. Joe’s experience includes projects of all sizes. His accuracy and efficiency in the field ensures a successful and well-documented project, from construction through closeout. His work includes making sure that the jobsite is safe and that the contractor is efficient with his time.
exPerIence
local streets rehabilitation Phase I (concrete ImProvements) zone 3, norwalk Joe served as construction inspector on the Local Streets Rehabilitation Program Phase I (Concrete Improvements) in Zone 3, which is bound by the Union Pacific Railroad to the Northwest, the I-5 Freeway to the Northeast, Imperial Highway to the South, and Firestone Boulevard to Southwest. The project involves removal and replacement of sidewalk (3,000 SF); curb and gutter (2,600 LF); new and replacement ADA curb ramps (93 ramps and 10 truncated domes); driveway approach repairs (500 SF); cross gutter replacements (29 locations with associated curb ramps); including incidental asphalt work, utility relocations and traffic control. DATE: 09/2022-11/2022 Phase 6b resiDential street rehabilitation Project, la mIraDa Joe was the Construction Inspector on phase 6B of this Residential Street Rehabilitation Project for the City of La Mirada. The project covered the residential area north of Biola University, bound by Biola Avenue to the west and La Mirada Boulevard to the east, and by Imperial Highway to the north. The work entailed AC pavement reconstruction, cold milling, asphalt rubber hot mix overlay, Type 2 slurry seal, removal and replacement of damaged curb, gutter, cross gutter, sidewalk and curb ramps. Construction also included adjustment of manholes and water valves, traffic signing, striping, markings. DATE: 2022
Phase 3 local streets rehabilitation (zone 24, 27, & 32), norwalk Joe served as the construction inspector to the City of Norwalk on the 3rd Stage of Construction of the Local Streets Rehabilitation Paving Improvements. The work included three separate City projects (No. 7924-Zone 24. No. 7925-Zone 25, and No. 7926-Zone 32). Stage 1 of this project included concrete improvements, and OE provided CM and Inspection services for Zone 32 of that phase. Stage 3 included a variety of pavement rehabilitation methods including full-depth repair, grind and overlay, and slurry seal for Zones 24, 27, and 32. Twenty-one streets with a total of 3.6 centerline miles were included as part of this project. These limits were within the two blocks of Highdale Street between Elaine Avenue and Ibex Avenue which had a PCI rated less than 25 (very poor). The streets were also adjacent to Edmondson Elementary School, requiring careful coordination with the school. The replacement of the deteriorated pavement and accessibility ramps was important to improving the safety of the school zone and extending the useful life of the streets. The rehabilitation work involved street repaving which included curb and gutter repairs, slotted cross gutter replacements and pedestrian accessibility ramps at intersection corners to meet current standards. DATE: 2021
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -152-
various streets ImProvement, Fy 2020-21 (cIP no. 881), montebelloJoe served as construction inspector to the City of Mont e
b
e
l
l
o
o
n
t
h
i
s
p
r
o
j
e
c
t
.
T
h
e
r
e
a
r
e
f
i
v
e
s
t
r
e
e
t
s
e
g
m
e
n
t
s
included in this project. These five segments are (1) Minson W
a
y
,
f
r
o
m
S
y
c
a
m
o
r
e
S
t
r
e
e
t
t
o
t
h
e
C
u
l
-
D
u
-
S
a
c
;
(
2 )
A
l
l
s
t
o
n
Street, from W. City Limit to W. Olympic Boulevard; (3) Med f
o
r
d
S
t
r
e
e
t
,
f
r
o
m
A
l
l
s
t
o
n
S
t
r
e
e
t
t
o
1 8
t
h
S
t
r
e
e
t
;
(
4 )
M
i
l
l
i
s
Street, from Kensington Way to Medford Street; and (5) Ke n
s
i
n
g
t
o
n
W
a
y
,
f
r
o
m
O
l
y
m
p
i
c
B
o
u
l
e
v
a
r
d
t
o
A
l
l
s
t
o
n
S
t
r
e
e
t
.
The work included variable grind and ARHM overlay, full rec o
n
s
t
r
u
c
t
i
o
n
f
o
r
h
e
a
v
i
l
y
d
e
t
e
r
i
o
r
a
t
e
d
a
r
e
a
s
,
c
o
n
s
t
r
u
c
t
i
o
n
of a concrete alley intersection, and PCC improvements co v
e
r
i
n
g
c
r
o
s
s
g
u
t
t
e
r
s
,
s
i
d
e
w
a
l
k
,
c
u
r
b
a
n
d
g
u
t
t
e
r
,
d
r
i
v
e
w
a
y
approaches, curb ramps, and brick pavers. DATE: 2021
slurry seal For santa gertruDes & hillsborough Project, la mIraDaJoe was the Construction Inspector for the City of La Mirad a
o
n
t
h
e
S
l
u
r
r
y
S
e
a
l
f
o
r
S
a
n
t
a
G
e
r
t
r
u
d
e
s
a
n
d
H
i
l
l
s
b
o
r
o
u
g
h
Project (CIP 2021-07). The project limits are on Santa Gertru d
e
s
A
v
e
n
u
e
f
r
o
m
L
e
m
o
n
D
r
i
v
e
t
o
L
a
M
i
r
a
d
a
B
o
u
l
e
v
a
r
d
(
2 .
4 miles) and on Hillsborough Drive from Alicante Road to Beac h
B
o
u
l
e
v
a
r
d
(
0 .
9 m
i
l
e
s
)
.
T
h
e
s
c
o
p
e
o
f
w
o
r
k
i
n
c
l
u
d
e
s
T
y
p
e
I
I
Slurry Seal as well as digout areas. DATE: 2021
neighborhooD slurry seal-area 1 Project, la mIraDaJoe was the Construction Inspector on this neighborhood s
l
u
r
r
y
s
e
a
l
p
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
L
a
M
i
r
a
d
a
.
T
h
i
s
p
r
o
j
e
c
t
covers several residential streets within the City, includi n
g
t
h
e
F
o
s
t
e
r
P
a
r
k
n
e
i
g
h
b
o
r
h
o
o
d
a
n
d
I
m
p
e
r
i
a
l
H
i
g
h
w
a
y
,
Neargrove Road, Jalisco Road, Florita Road, Crestoak Drive, G a
r
a
D
r
i
v
e
,
A
s
h
g
r
o
v
e
D
r
i
v
e
,
E
x
c
e
l
s
i
o
r
D
r
i
v
e
,
N
e
a
r
t
r
e
e
R
o
a
d
,
Bluefield Avenue, Stanleaf Drive, Figueras Road, and San Br u
n
o
D
r
i
v
e
.
C
o
n
s
t
r
u
c
t
i
o
n
i
n
c
l
u
d
e
d
S
l
u
r
r
y
S
e
a
l
(
T
y
p
e
)
o
f
t
h
e
streets and some localized repairs. DATE: 2019
neighborhooD slurry seal - area 2, la mIraDaJoe provided construction inspection services on this Neig h
b
o
r
h
o
o
d
S
l
u
r
r
y
S
e
a
l
P
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
L
a
M
i
r
a
d
a
.
T
h
e
limits of work included residential streets in the area south o
f
L
e
f
f
i
n
g
w
e
l
l
A
v
e
n
u
e
,
w
e
s
t
o
f
S
a
n
t
a
G
e
r
t
r
u
d
e
s
A
v
e
n
u
e
,
east of Telegraph Road, and north of Foster Road. The co n
s
t
r
u
c
t
i
o
n
i
n
c
l
u
d
e
d
2 ,
1 5
0 e
l
o
n
g
a
t
e
d
t
o
n
s
o
f
T
y
p
e
I
I
S
l
u
r
r
y
Seal. DATE: 2020
collector street slurry seal Project, la mIraDaJoe provided Construction Inspection services for the C o
l
l
e
c
t
o
r
S
t
r
e
e
t
S
l
u
r
r
y
P
r
o
j
e
c
t
(
C
I
P
N
o
.
2 0
1 8
-
0 9
)
.
T
h
i
s
neighborhood slurry seal project covers collector street s
w
i
t
h
i
n
t
h
e
C
i
t
y
i
n
c
l
u
d
i
n
g
B
i
o
l
a
A
v
e
n
u
e
,
S
t
a
g
e
R
o
a
d
,
Escalona Road, Foster Road, Adelfa Drive, and Alicante Road.
T
h
e
c
o
n
s
t
r
u
c
t
i
o
n
i
n
c
l
u
d
e
d
1 ,
3 6
7 e
l
o
n
g
a
t
e
d
t
o
n
s
o
f
T
y
p
e
II Slurry Seal on collector streets. DATE: 2020
local streets rehabIlItatIon Project, norwalkJoe served as the primary inspector in this Local Streets Re h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
N
o
r
w
a
l
k
t
o
r
e
h
a
b
i
l
i
t
a
t
e
multiple street segments within the City. Twenty-one str e
e
t
s
w
i
t
h
a
t
o
t
a
l
o
f
3 .
6 c
e
n
t
e
r
l
i
n
e
m
i
l
e
s
w
e
r
e
i
n
c
l
u
d
e
d
a
s
part of this project. These limits were within the two bloc k
s
o
f
H
i
g
h
d
a
l
e
S
t
r
e
e
t
b
e
t
w
e
e
n
E
l
a
i
n
e
A
v
e
n
u
e
a
n
d
I
b
e
x
Avenue and had a PCI rated less than 25 (very poor). The s t
r
e
e
t
s
w
e
r
e
a
d
j
a
c
e
n
t
t
o
E
d
m
o
n
d
s
o
n
E
l
e
m
e
n
t
a
r
y
S
c
h
o
o
l
.
The replacement of the deteriorated pavement and acce
s
s
i
b
i
l
i
t
y
r
a
m
p
s
w
a
s
i
m
p
o
r
t
a
n
t
t
o
i
m
p
r
o
v
i
n
g
t
h
e
s
a
f
e
t
y
of the school zone and extending the useful life of the s t
r
e
e
t
s
.
T
h
e
r
e
h
a
b
i
l
i
t
a
t
i
o
n
w
o
r
k
i
n
v
o
l
v
e
d
s
t
r
e
e
t
r
e
p
a
v
i
n
g
which included curb and gutter repairs, slotted cross gutt e
r
r
e
p
l
a
c
e
m
e
n
t
s
a
n
d
p
e
d
e
s
t
r
i
a
n
a
c
c
e
s
s
i
b
i
l
i
t
y
r
a
m
p
s
a
t
intersection corners to meet current standards. DATE: 05/10/2019 alonDra boulevarD traFFic signal & roaDway imProvements, la miraDaJoe provided construction inspection services to the City o
f
L
a
M
i
r
a
d
a
o
n
t
h
e
A
l
o
n
d
r
a
B
o
u
l
e
v
a
r
d
T
r
a
f
f
i
c
S
i
g
n
a
l
a
n
d
Roadway Improvements Project which covered nearly 1.75 mil e
s
o
f
r
o
a
d
w
a
y
o
n
A
l
o
n
d
r
a
B
o
u
l
e
v
a
r
d
b
e
t
w
e
e
n
V
a
l
l
e
y
V
i
e
w
Drive and Mottley Drive. The work entailed traffic signal in s
t
a
l
l
a
t
i
o
n
s
a
n
d
u
p
g
r
a
d
e
s
,
A
C
p
a
v
e
m
e
n
t
r
e
c
o
n
s
t
r
u
c
t
i
o
n
,
cold milling, asphalt rubber hot mix overlay, Type 2 slurry s
e
a
l
,
r
e
m
o
v
a
l
a
n
d
r
e
p
l
a
c
e
m
e
n
t
o
f
d
a
m
a
g
e
d
c
u
r
b
,
g
u
t
t
e
r
,
cross gutter, sidewalk and curb ramps. Construction will a
l
s
o
i
n
c
l
u
d
e
a
d
j
u
s
t
m
e
n
t
o
f
m
a
n
h
o
l
e
s
a
n
d
w
a
t
e
r
v
a
l
v
e
s
,
traffic signing, striping, markings, and raised pavement mar k
e
r
s
.
DATE: 2020
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
-153-
J
, L
mIcHael nguyen
constructIon InsPector
32 yearS of exPerience7
yearS witH Firm
FielDs oF exPertise:
ROADWAY
RESIDENTIAL
PAVEMENT
SLURRY SEAL
DRAINAGE
qualIFIcatIons
16 years insPection for the County of Orange • aa Degree inDustrial technology California Polytechnic Universtiy, Pomona • 60 unIts mechanIcal engIneerIng California Polytechnic Universtiy, Pomona
backgrounD
Michael worked for 16 years as a Construction Inspector to a Supervising Construction Inspector for the County of Orange, the highest attainable position in the County’s inspection series (Principal Construction Inspector was converted to Administration Manager I recently). His typical duties include providing daily construction reports, documenting labor and equipment on-site each day and hours worked; measuring, calculating, and recording all construction measurements and quantities, ensuring safety for construction site and NPDES compliance for State/ Regional Water Quality Control Boards, and taking work in progress and site photos. While at the County of Orange, he was known as the Slurry King due to his ability to document and track quantities in a precise way. exPerIence
rosecrans avenue imProvement Project, manhattan beach
Michael provided Construction Inspection services to the City of Manhattan Beach on the Rosecrans Avenue Improvement Project. The limits of the project was on the major arterial of Rosecrans Avenue, from Aviation Boulevard to Village Drive. This segment of roadway is approximately 4,200 linear feet, and the roadway condition varied, with rutting, blocking, and alligator cracking found throughout. Rosecrans Avenue sees heavy daily traffic volume, and it is an important thoroughfare in the City, so it had a high-profile identify. The project entailed cold milling and rubberized asphalt concrete overlay, installation of Tensar GlasPave50, double adjustment of manholes, pavement marking/striping, installation of traffic loops, multiple commercial driveway upgrades, and access ramp upgrades at 8 locations. All eastbound lanes including the left turn pockets of Rosecrans Avenue from Aviation Boulevard to Village Drive were part of the project limits. Construction work was performed at night, adding another level of complexity.
DATE: 02/2021
local resiDential streets rehabilitation, zone 19 Project, Phase II, norwalk Michael provided Construction Inspection services on phase 2 for the City of Norwalk’s Local Residential Streets Rehabilitation, Zone 19 Project. The pavement management zone limits were bound by Stranstead Avenue to the west, Priscila Street to the north, Shoemaker Avenue to the east, and Rosecrans Avenue to the south, containing approximately 37,500 linear feet (7.1 miles) of local road surface that was slated for rehabilitation. The project was split into two phases: Phase A for concrete work, and Phase B for asphalt work, with the objective of improving the PCI for residential streets, extending the useful roadway life to at least 20 years, improving drainage, upgrading to safer and easier ride quality streets with greater pedestrian access, minimizing future maintenance costs and enhancing aesthetics. The scope called for the development of PS&E to include a total of 94 ADA curb ramps and 8 slotted cross gutters, along with driveway apron construction, utility appurtenance adjustments and relocation, and signing and striping replacement. Also for this project, OE utilized its state-of-the-art high-speed 3D point cloud laser scanner to conduct surveys of approximately 60 existing centerline monuments for preservation. DATE: 2022
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-154-
i)¢j
\J—r—J. - .. 13.4; a; :./.P:J£J:NC: Q A
5-4. :h‘h. 1:.1'511] l
street & slurry seal rehabIlItatIon - Phase III, laguna beachMichael provided full Construction Inspection Services for t
h
e
C
i
t
y
o
f
L
a
g
u
n
a
B
e
a
c
h
o
n
p
h
a
s
e
I
I
I
o
f
t
h
i
s
p
r
o
j
e
c
t
.
T
h
e
project limits for Phase III (2019) included two areas, Area A :
C
o
a
s
t
R
o
y
a
l
,
a
n
d
A
r
e
a
B
:
S
o
u
t
h
L
a
g
u
n
a
V
i
l
l
a
g
e
.
T
h
e
s
e
areas are in South Laguna Beach, from the neighborhoods
b
e
t
w
e
e
n
W
e
s
t
S
t
r
e
e
t
a
n
d
1 0
t
h
A
v
e
n
u
e
/
S
u
n
s
e
t
A
v
e
n
u
e
.
The work included variable grind and overlay in some areas ,
a
n
d
T
y
p
e
I
S
l
u
r
r
y
S
e
a
l
i
n
o
t
h
e
r
a
r
e
a
s
.
T
h
e
r
e
w
a
s
2 ,
5 6
2 square feet of French Drain that was installed in Area A. A 4 -
i
n
c
h
d
r
a
i
n
l
i
n
e
w
a
s
c
o
n
n
e
c
t
e
d
t
o
a
c
a
t
c
h
b
a
s
i
n
i
n
A
r
e
a
A
as well. The specifications also called for new traffic signal p
o
l
e
s
a
t
t
h
e
S
k
y
l
i
n
e
D
r
i
v
e
,
C
r
e
s
t
v
i
e
w
D
r
i
v
e
,
a
n
d
F
e
r
n
S
t
r
e
e
t
Intersections. Lastly, the project encompassed parkway a n
d
c
u
r
b
a
n
d
g
u
t
t
e
r
i
m
p
r
o
v
e
m
e
n
t
s
,
s
i
g
n
a
g
e
a
n
d
s
t
r
i
p
i
n
g
.
Due to the residential element involved, OE provided Web M
a
p
s
a
n
d
a
P
r
o
j
e
c
t
H
o
t
l
i
n
e
f
o
r
a
f
f
e
c
t
e
d
r
e
s
i
d
e
n
t
s
,
k
e
e
p
i
n
g
them updated and informed through out the life of the proj e
c
t
.
DATE: 2020
mauna loa avenue resiDential street ImProvements & water main Installation Project, glenDoraMichael provided Construction Inspection services to the C
i
t
y
o
f
G
l
e
n
d
o
r
a
o
n
t
h
e
M
a
u
n
a
L
o
a
A
v
e
n
u
e
W
a
t
e
r
M
a
i
n
Installation and Street Improvements Project. This project c
o
n
s
i
s
t
e
d
o
f
i
n
s
t
a
l
l
i
n
g
6 ,
4 0
0 L
F
o
f
n
e
w
8 -
i
n
.
w
a
t
e
r
m
a
i
n
and 194,000 SF of street improvements that included pavem e
n
t
r
e
h
a
b
i
l
i
t
a
t
i
o
n
o
f
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
,
c
o
n
c
r
e
t
e
s
i
d
e
w
a
l
k
repairs, curb and gutter repairs, repairing 11 ADA non-compli a
n
t
c
u
r
b
r
a
m
p
s
,
t
r
a
f
f
i
c
s
i
g
n
a
l
l
o
o
p
r
e
p
l
a
c
e
m
e
n
t
,
s
i
g
n
i
n
g
,
and striping for a total of 100 working days. The project was
l
o
c
a
t
e
d
a
l
o
n
g
3 s
t
r
e
e
t
s
o
f
f
G
l
e
n
d
o
r
a
A
v
e
n
u
e
-
M
a
u
n
a
L
o
a
Avenue, Duell Street, and Linfield Street, as well as Minneso t
a
A
v
e
n
u
e
.
DATE: 2023
rialto cemetary Project, rialtoMichael served as Construction Inspecto to the City of Ri a
l
t
o
o
n
t
h
e
R
i
a
l
t
o
C
e
m
e
t
a
r
y
P
r
o
j
e
c
t
.
T
h
e
p
u
r
p
o
s
e
o
f
t
h
e
project was to perform value engineering on a catch basi n
,
d
r
a
i
n
l
i
n
e
,
a
n
d
c
u
r
b
a
n
d
g
u
t
t
e
r
s
t
o
i
m
p
r
o
v
e
d
r
a
i
n
a
g
e
for the project, and adding additional sidewalk repairs fo r
A
D
A
c
o
m
p
l
i
a
n
c
e
.
T
i
m
e
w
a
s
s
p
e
n
t
f
o
r
t
h
e
p
r
e
p
a
r
a
t
i
o
n
,
administration, inspection, and negotiation for Change Or d
e
r
s
#
0 1
a
n
d
#
0 2
.
F
u
r
t
h
e
r
s
e
r
v
i
c
e
s
p
r
o
v
i
d
e
d
i
n
c
l
u
d
e
d
engineering support, and negotiating with the Contractor
f
o
r
a
f
a
i
r
c
o
s
t
a
n
d
t
o
b
r
i
n
g
v
a
l
u
e
f
o
r
t
h
e
C
i
t
y
t
o
a
m
e
n
d
deficiencies noted during construction without impacting t
h
e
o
v
e
r
a
l
l
c
o
n
s
t
r
u
c
t
i
o
n
s
c
h
e
d
u
l
e
a
n
d
t
o
a
c
h
i
e
v
e
c
o
s
t
savings for the City. DATE: 2023
n. concourse avenue street ImProvement Project, Fy 2020-21 (cP no. 880), montebello Michael was the Construction Inspector on the N. Concou r
s
e
A
v
e
n
u
e
S
t
r
e
e
t
I
m
p
r
o
v
e
m
e
n
t
P
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
Montebello. The project limits were on N. Concourse Avenu e
f
r
o
m
W
.
M
a
d
i
s
o
n
A
v
e
n
u
e
t
o
W
.
B
e
v
e
r
l
y
B
o
u
l
e
v
a
r
d
.
T
h
e
work entailed a grind and ARHM overlay, and concrete im p
r
o
v
e
m
e
n
t
s
i
n
c
l
u
d
i
n
g
g
u
t
t
e
r
,
d
r
i
v
e
w
a
y
a
p
p
r
o
a
c
h
e
s
,
c
u
r
b
ramps, and sidewalk segments within the project limits. DATE: 2022 baja st. retaining wall & zones 2 & 3 street co
n
c
r
e
t
e
r
e
h
a
b
i
l
i
t
a
t
i
o
n
Project, laguna beach
Michael was the Construction Inspector on this project in t
h
e
C
i
t
y
o
f
L
a
g
u
n
a
B
e
a
c
h
.
T
h
e
B
a
j
a
S
t
r
e
e
t
R
e
t
a
i
n
i
n
g
W
a
l
l
Replacement is a project adjacent to 870 Baja Street. The w o
r
k
e
n
t
a
i
l
e
d
c
o
n
s
t
r
u
c
t
i
n
g
a
s
h
o
t
c
r
e
t
e
c
o
n
c
r
e
t
e
w
a
l
l
w
i
t
h
soil nails in front of a failing CMU retaining wall which was s u
p
p
o
r
t
i
n
g
a
s
l
o
p
e
o
n
p
r
i
v
a
t
e
p
r
o
p
e
r
t
y
.
A
s
f
o
r
t
h
e
Z
o
n
e
s
2 & 3 Street Concrete Rehabilitation Project, it was a sidewalk r
e
p
a
i
r
p
r
o
j
e
c
t
w
h
i
c
h
i
n
c
l
u
d
e
d
v
a
r
i
o
u
s
l
o
c
a
t
i
o
n
s
i
n
Z
o
n
e
s
2 and 3. The sidewalk repairs covered 9,000 square feet and
t
h
e
w
o
r
k
a
l
s
o
c
o
v
e
r
e
d
s
p
a
n
d
r
e
l
r
e
p
a
i
r
s
,
c
u
r
b
a
n
d
g
u
t
t
e
r
,
and cross gutter removal and replacement. DATE: 2020
2017 slurry seal Program (I-139 / I-159), torranceMichael served as Construction Inspector on this $2.5 m
i
l
l
i
o
n
d
o
l
l
a
r
s
l
u
r
r
y
s
e
a
l
p
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
T
o
r
r
a
n
c
e
covering three residential neighborhoods, as well as Camino
d
e
l
a
C
o
s
t
a
f
r
o
m
C
a
l
l
e
M
i
r
a
m
a
r
t
o
t
h
e
C
i
t
y
l
i
m
i
t
;
M
a
d
i
s
o
n
Street and Hawthorne Boulevard service road between 240 t
h
S
t
r
e
e
t
a
n
d
S
k
y
p
a
r
k
D
r
i
v
e
;
2 4
0 t
h
S
t
r
e
e
t
f
r
o
m
H
a
w
t
h
o
r
n
e
Boulevard to Madison Street; and arterial and collector st r
e
e
t
s
o
n
A
n
z
a
A
v
e
n
u
e
,
f
r
o
m
C
a
l
l
e
M
a
y
o
r
t
o
S
e
p
u
l
v
e
d
a
Boulevard, Ocean Avenue from the Pacific Coast Highway to
T
o
r
r
a
n
c
e
B
o
u
l
e
v
a
r
d
,
a
l
o
n
g
w
i
t
h
M
a
d
r
o
n
a
A
v
e
n
u
e
s
o
u
t
h
o
f
the Prairie Avenue Bridge to Sepulveda Boulevard. Four City p
a
r
k
i
n
g
l
o
t
s
w
e
r
e
a
l
s
o
s
l
u
r
r
y
s
e
a
l
e
d
.
DATE: 12/2017
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
-155-
J
, L
kevIn green
constructIon InsPector
15 yearS of exPerience2
yearS witH Firm
FielDs oF exPertise:
ROADWAY PAVEMENT ADA RAMP SIDEWALK WIDENING
qualIFIcatIons
swPPP certIFIeD Storm Water Pollution Prevention Plan • certIFIeD Radiation Safety • osha 10 & 30 MSHA & Nuclear Gauge • qsP/qsD 40 Hour Training Certification • raPID set concrete • trenchIng & shorIng saFety • conFIneD worksPace • asbestos awareness • ba: Psychology/Sociology/Business, La Sierra University
backgrounD
Kevin Green has accumulated over 13 years of experience in performing both construction inspection and construction management services on highway and public works construction projects for the interest of both state and local agencies. His work experience over those years includes performing constructability reviews, field inspection, materials testing, documents control, and site management. The work involved on these projects required extensive roadway and highway construction and rehabilitation, emergency roadway repair and local street rehabilitations that encompassed earthwork, Jointed Plane Concrete and Rapid Set Concrete and Hot Mix Asphalt and Alternative Rubberized Asphalt Membrane paving and Cold foam-in-place recycle paving, barrier rail, concrete and electrical work, directional drilling, Cast-in-Drilled Hole for overhead sign foundations, pile driving, materials testing, and SWPPP/WPC and COZEP compliance. Further work that required both Kevin’s inspection review and management oversight include electrical, controllers, pull boxes, ramp meters, traffic signals, crosswalk push buttons and signals, ETTM systems, traffic loops, camera systems, hot mix asphalt, jointed plane/rapid strength/set concrete paving, median concrete barrier, electrical, striping, traffic control and construction liaison to the Caltrans Chief Public Information Officer. Kevin brings to the table a thorough knowledge of The Caltrans Standard Plans, Specifications and Construction Manual and of construction oversight. exPerIence
santa anIta actIve transPortatIon Program cycle 5 Project, el monte Kevin provided the City of El Monte with Inspection Services for the Santa Anita Active Transportation Program (ATP) Project, CIP No. 890. This project was funded by LACMTA Net Toll Revenue Reinvestment Grant Fund and Measure M funding, totaling $2,200,000. This project entailed cold-milling and ARHM overlay (nearly 200,000 tons). Additionally, the project included video detection and traffic signal updates, and wayfinding sign and bike rack installation at various intersections. The purpose of this project was to improve safety for all roadway users, improve conditions for non-motorized modes of travel thereby promoting pedestrian, cycle and transit use, improve neighborhood connectivity and livability, and to improve the comfort of non-motorized user traveling to and from the El Monte Transit Center and Downtown El Monte. Work was split into three segments, Class II Bike Lane Installation on Santa Anita Avenue from Tyler Avenue to Lower Azusa Road (0.53 miles), Pavement, Curb and Ramp Upgrades on Tyler Avenue from Ramona Blvd. to Santa Anita Avenue (0.97 miles), and Pavement, Curb and Ramp Upgrades on Ramona Blvd. from Santa Anita Avenue to Tyler Avenue (0.36 miles). DATE: 09/2023 i-405 civil roaDway & electrical construction, orange
Kevin performed as the Lead Construction Inspector on the I-405 Civil Roadway and Electrical Construction Project for the County of Orange. His assigned duties included supervising four construction inspectors and two technical analysts in the midst of having to perform concrete inspection services and also while overseeing the removal of SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -156-
'5
15.4; a; EXPERJENCE
J‘ _/1 _
1;...:. an]. r.
curbs and gutters, the grading of freeway bridges, MSE w a
l
l
s
,
r
e
t
a
i
n
i
n
g
w
a
l
l
s
,
b
a
c
k
f
i
l
l
,
H
M
A
p
a
v
i
n
g
,
c
o
n
c
r
e
t
e
,
a
n
d
storm drains and vaults for this job. This fast-paced project
c
o
n
t
i
n
u
e
d
o
n
f
o
r
a
3 -
y
e
a
r
p
e
r
i
o
d
.
DATE: 2021lacmta - metro golD line Foothill extension Phase 2a, orangeKevin provided Construction Inspection services on the L A
C
M
T
A
-
M
e
t
r
o
G
o
l
d
L
i
n
e
F
o
o
t
h
i
l
l
E
x
t
e
n
s
i
o
n
P
h
a
s
e
2 A
Project. The Metro Gold Line Foothill Extension Constructio n
A
u
t
h
o
r
i
t
y
(
C
o
n
s
t
r
u
c
t
i
o
n
A
u
t
h
o
r
i
t
y
)
,
w
a
s
c
r
e
a
t
e
d
i
n
1 9
9 8
as an independent agency by the California State Legislat u
r
e
t
o
s
p
e
c
i
f
i
c
a
l
l
y
a
d
d
r
e
s
s
t
h
e
p
l
a
n
n
i
n
g
,
d
e
s
i
g
n
i
n
g
a
n
d
construction of the Los Angeles County Metropolitan Trans p
o
r
t
a
t
i
o
n
A
u
t
h
o
r
i
t
y
(
L
A
C
M
T
A
)
G
o
l
d
L
i
n
e
,
f
r
o
m
L
o
s
A
n
g
e
l
e
s
to Pasadena. Since then, further extensions have been pla n
n
e
d
w
i
t
h
t
h
e
u
l
t
i
m
a
t
e
g
o
a
l
o
f
r
e
a
c
h
i
n
g
O
n
t
a
r
i
o
A
i
r
p
o
r
t
i
n
2019. The purpose of the project was to address a 11.5 mile s e
g
m
e
n
t
f
r
o
m
P
a
s
a
d
e
n
a
t
o
A
z
u
s
a
b
y
w
a
y
o
f
a
n
e
x
t
e
n
s
i
o
n
of the Gold Line that would occupy a portion of previously a
b
a
n
d
o
n
e
d
B
u
r
l
i
n
g
t
o
n
N
o
r
t
h
e
r
n
S
a
n
t
a
F
e
R
a
i
l
w
a
y
(
B
N
S
F
)
trackage now owned and operated by Southern California Re g
i
o
n
a
l
R
a
i
l
A
u
t
h
o
r
i
t
y
(
S
C
R
R
A
)
.
W
i
t
h
i
n
t
h
e
p
r
o
j
e
c
t
l
i
m
i
t
s
o
f
Phase 2A were six at-grade crossings with movement on frei g
h
t
a
n
d
l
i
g
h
t
r
a
i
l
t
r
a
c
k
s
.
E
a
c
h
o
f
t
h
e
s
e
c
r
o
s
s
i
n
g
s
i
m
p
r
o
v
e
d
Automatic Highway Warning Systems (AHWS) to further en
h
a
n
c
e
t
h
e
s
a
f
e
t
y
o
f
t
h
e
p
u
b
l
i
c
.
T
h
e
i
m
p
l
e
m
e
n
t
e
d
d
e
s
i
g
n
also improved upon the existing Automatic Block System
p
r
e
s
e
n
t
t
o
d
a
y
.
P
r
o
j
e
c
t
H
i
g
h
l
i
g
h
t
s
i
n
c
l
u
d
e
d
i
n
t
e
r
f
a
c
i
n
g
o
f
freight and light rail crossing systems, meeting railroad sign a
l
s
t
a
n
d
a
r
d
s
,
f
r
e
i
g
h
t
c
r
o
s
s
i
n
g
a
n
d
w
a
y
s
i
d
e
s
i
g
n
a
l
d
e
s
i
g
n
,
technical specifications per SCRRA standards, constructi o
n
p
h
a
s
i
n
g
p
l
a
n
s
,
p
r
o
g
r
a
m
d
e
v
e
l
o
p
m
e
n
t
,
i
n
-
s
e
r
v
i
c
e
t
e
s
t
i
n
g
of freight signal system, and full signal system “as-built” draw i
n
g
s
.
K
e
v
i
n
w
a
s
t
a
s
k
e
d
w
i
t
h
t
h
e
r
e
s
p
o
n
s
i
b
i
l
i
t
y
i
n
p
r
o
v
i
d
i
n
g
concrete inspections on concrete mix designs, the Quality C o
n
t
r
o
l
p
l
a
n
s
,
a
n
d
t
o
v
e
r
i
f
y
a
v
a
r
i
e
t
y
o
f
s
a
m
p
l
i
n
g
t
o
m
e
e
t
t
h
e
requirements of ACI. This project lasted for approximately a t h
r
e
e
y
e
a
r
p
e
r
i
o
d
.
DATE: 2019i-710 Freeway & hobart yarD briDge Pavement rehabilitation & wiDening, orangeKevin served as the Construction Inspector on the I-710 Fre e
w
a
y
a
n
d
H
o
b
a
r
t
Y
a
r
d
B
r
i
d
g
e
P
a
v
e
m
e
n
t
R
e
h
a
b
i
l
i
t
a
t
i
o
n
a
n
d
Widening Project. The project spanned a 3.5 mile stretch of I
-
7 1
0 t
h
r
o
u
g
h
t
h
e
C
i
t
y
o
f
C
o
m
m
e
r
c
e
,
C
i
t
y
o
f
V
e
r
n
o
n
,
C
i
t
y
of Bell, and the unincorporated area of East Los Angeles, fr o
m
S
l
a
u
s
o
n
A
v
e
n
u
e
t
o
R
o
u
t
e
6 0
.
T
h
e
p
r
o
j
e
c
t
a
l
s
o
i
n
c
l
u
d
e
d
concrete pavement rehabilitation and jointed plain conc r
e
t
e
p
a
v
e
m
e
n
t
(
J
P
C
P
-
R
S
)
a
n
d
c
o
n
t
i
n
u
o
u
s
l
y
r
e
i
n
f
o
r
c
e
d
concrete pavement(CRCP-RS), as well as bridge approac
h
s
l
a
b
r
e
p
a
i
r
s
o
n
s
e
v
e
r
a
l
b
r
i
d
g
e
s
a
l
o
n
g
t
h
e
c
o
r
r
i
d
o
r
.
A
l
l
northbound lanes between Bandini Boulevard and the I-5/I-7 1 0
I
n
t
e
r
c
h
a
n
g
e
w
e
r
e
r
e
p
l
a
c
e
d
w
i
t
h
J
P
C
P
-
R
S
.
T
h
e
m
e
d
i
a
n
shoulders were repaved with JPCP-RS, and the median barr i
e
r
w
a
s
u
p
g
r
a
d
e
d
t
o
m
e
e
t
c
u
r
r
e
n
t
s
t
a
n
d
a
r
d
s
.
T
h
e
p
r
o
j
e
c
t
further included installing new overhead sign structures an d
c
h
a
n
g
e
a
b
l
e
m
e
s
s
a
g
e
s
i
g
n
,
a
n
d
u
p
g
r
a
d
e
s
t
o
d
r
a
i
n
a
g
e
.
A significant scope element of the project was the widenin g
o
f
t
h
e
H
o
b
a
r
t
Y
a
r
d
B
r
i
d
g
e
i
n
b
o
t
h
d
i
r
e
c
t
i
o
n
s
f
o
r
1 ,
3 0
0 L
F
over 18 sets of railroad tracks. Additionally, existing barriers a n
d
o
v
e
r
h
a
n
g
s
w
e
r
e
d
e
m
o
l
i
s
h
e
d
a
n
d
t
h
e
b
r
i
d
g
e
w
i
d
e
n
i
n
g
was constructed at six other locations. Work included insta l
l
a
t
i
o
n
o
f
g
i
r
d
e
r
s
,
f
o
r
m
i
n
g
,
a
n
d
p
o
u
r
i
n
g
o
f
d
i
a
p
h
r
a
g
m
a
n
d
backwalls and deck construction. The purpose of the projec t
w
a
s
t
o
w
i
d
e
n
a
n
d
r
e
h
a
b
i
l
i
t
a
t
e
t
h
e
n
o
r
t
h
a
n
d
s
o
u
t
h
b
o
u
n
d
lanes of Route 710 in seven stages. The project was compl e
t
e
d
1 8
m
o
n
t
h
s
a
h
e
a
d
o
f
s
c
h
e
d
u
l
e
t
h
a
n
k
s
t
o
i
n
n
o
v
a
t
i
v
e
solutions as a result of collaborative partnering. To achiev e
t
h
i
s
,
K
e
v
i
n
a
n
d
t
h
e
t
e
a
m
r
e
l
i
e
d
o
n
o
p
e
n
a
n
d
t
r
a
n
s
p
a
r
e
n
t
communication and partnering strategies focused on deliv e
r
i
n
g
i
d
e
a
s
f
r
o
m
e
a
c
h
t
e
a
m
m
e
m
b
e
r
.
A
d
v
a
n
c
e
d
p
l
a
n
n
i
n
g
efforts also re-sequenced project staging to complete con s
t
r
u
c
t
i
o
n
w
i
t
h
i
n
6 1
%
o
f
t
h
e
c
o
n
t
r
a
c
t
e
d
s
c
h
e
d
u
l
e
w
i
n
d
o
w
with no claims or disputes. For his tasks at hand, Kevin mon i
t
o
r
e
d
t
h
e
r
e
m
o
v
a
l
o
f
c
u
r
b
s
a
n
d
g
u
t
t
e
r
s
a
n
d
t
h
e
g
r
a
d
i
n
g
of the I-710 freeway bridges, along with overseeing the co n
s
t
r
u
c
t
i
o
n
o
f
M
S
E
w
a
l
l
s
,
r
e
t
a
i
n
i
n
g
w
a
l
l
s
,
b
a
c
k
f
i
l
l
a
s
p
h
a
l
t
paving, concrete, storm drain installation and vaults. The p
r
o
j
e
c
t
w
a
s
c
o
m
p
l
e
t
e
d
w
i
t
h
n
o
l
o
s
t
t
i
m
e
i
n
c
i
d
e
n
t
s
i
n
a
period of almost 2 years. DATE: 2018
resiDential street rehabilitation Project, la habraKevin provided inspection services on the Residential Str e
e
t
R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
i
n
t
h
e
C
i
t
y
o
f
L
a
H
a
b
r
a
.
T
h
e
project consisted of rehabilitating approximately 232,810 line a
r
f
e
e
t
(
4 4
m
i
l
e
s
)
o
f
r
e
s
i
d
e
n
t
i
a
l
s
t
r
e
e
t
s
,
w
h
i
c
h
i
n
v
o
l
v
e
d
7 zone segments within the City limits slated for the FY 19-20
F
i
s
c
a
l
Y
e
a
r
.
F
o
l
l
o
w
i
n
g
a
s
i
t
e
a
s
s
e
s
s
m
e
n
t
,
b
l
o
c
k
c
r
a
c
k
i
n
g
,
alligator cracking, and potholing was observed at vario u
s
f
r
e
q
u
e
n
c
i
e
s
t
h
r
o
u
g
h
o
u
t
t
h
e
s
e
g
m
e
n
t
e
d
a
r
e
a
s
.
T
h
e
resulting associated sub-tasks for this project required c o
n
s
t
r
u
c
t
i
n
g
A
D
A
c
o
m
p
l
i
a
n
t
c
u
r
b
r
a
m
p
s
,
r
e
c
o
n
s
t
r
u
c
t
i
n
g
damaged curb, gutter and cross-gutters and drivewa
y
s
a
d
j
a
c
e
n
t
t
o
r
e
m
o
v
e
d
c
u
r
b
&
g
u
t
t
e
r
,
a
d
j
u
s
t
i
n
g
u
t
i
l
i
t
y
appurtenances, and striping. The construction included c o
l
d
m
i
l
l
i
n
g
a
n
d
A
R
H
M
o
v
e
r
l
a
y
.
O
u
r
t
e
a
m
c
o
o
r
d
i
n
a
t
e
d
w
i
t
h
the City to ensure that concurrent water main projects l o
c
a
t
e
d
w
i
t
h
i
n
t
h
e
s
a
m
e
z
o
n
i
n
g
s
e
g
m
e
n
t
s
a
s
t
h
e
s
t
r
e
e
t
rehabilitation program were properly integrated to minimize
r
e
d
u
n
d
a
n
c
i
e
s
i
n
t
h
e
c
o
n
s
t
r
u
c
t
i
o
n
a
c
t
i
v
i
t
i
e
s
.
DATE: 2020
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
J
, L
mark luera
constructIon InsPector
16 yearS of exPerience5
yearS witH Firm
FielDs oF exPertise:
ROADWAY
RESIDENTIAL
PAVEMENT
SLURRY SEAL
DRAINAGE
qualIFIcatIons
PublIc works Plan InterPretatIon & estImatIng Citrus College | regulations & coDes County of Orange, County of Los Angeles & Multiple Cities & Municipalities backgrounD
Mark Luera is a public works inspector with over 16 years of experience involving a variety of public works projects.
His education at Citrus College involved coursework on Public Works Plan Interpretation and Estimations which entailed plans and estimate time interpretation alongside public works material, labor and equipment standards and requirements. He is thoroughly familiar with County of Orange Public Works regulations, codes and process.
His experience also includes working for the County of Los Angeles and City of Manhattan Beach as an Inspector, delivering exceptional multi-tasking capabilities with effective time management techniques. His responsibilities involved inspection of roadway, catch basin and storm drain reconstruction and repair, verifying conformity to plans and specifications, retrieving samples, compiling and reviewing materials, labor records, preparing test specimens and assisting and conducting field tests. Mark additional handled the inspection of concrete and asphalt installation, responded to contractor submittals, schedules, and requests, and verified compliance of pollution measures for the interest of public safety. Mark concurrently worked in the field permit offices, issuing permits for encroachments within the County right-of-way, where he interacted with the public, developing public outreach experience by answering questions and resolving complaints and providing input for local and public agencies. In demonstrating strong communication skills and ability to establish a rapport with the public, Mark has been commended for his positive relationship with constituents.
exPerIence
cowan heights Pcc & ac remeDial rePair Project, orange Public works Mark served as Construction Inspector to the County of Orange on the Cowan Heights PCC and AC Remedial Repair Project. Project site work was located within a number of Orange County streets, including Brighton Drive, Cowan Heights Drive, Highcliff Drive, Huntsman Road, Kimberwick Drive, La Sierra Place, Overhill Drive, Rangeview Drive, Saddlery Road, and Sirrine Drive. Mark’s inspection services focused on road maintenance project work being performed under The County of Orange Construction’s Job Order Contract. The scope of work for the project included removing existing striping and pavement markings, grinding operations, placement of base materials, asphalt concrete placement, fabrication of structural steel, erection of falsework, placement of concrete, application of a “slurry seal” and re-establishing pavement markings and related work, forms and documentation. DATE: 03/2020 ocean view channel rehabilitation, orange Public works
Mark served as Construction Inspector to the County of Orange Public Works Department on The Ocean View Channel Rehabilitation Project. The project required the construction of a 2,200 foot reinforced concrete trapezoidal channel that lined the existing earthen channel. Key tasks that Mark was involved with included inspecting the channel to establish horizontal and vertical control, calculating earthwork quantities for use in conducting earthwork operations and dewatering operations, the installation of steel rebar, the placing of concrete along the walls and
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-158-
.J /
r‘
mufipsmsucs A
,—J =
\J
1:4. mm. Eli“!
''''''
invert of the channel, the paving of the access road, the m
o
b
i
l
i
z
a
t
i
o
n
a
n
d
d
e
m
o
b
i
l
i
z
a
t
i
o
n
o
f
o
p
e
r
a
t
i
o
n
s
a
n
d
s
i
t
e
preparations. The project was completed on time, within bu d
g
e
t
,
a
n
d
w
i
t
h
a
c
c
e
p
t
a
b
l
e
q
u
a
l
i
t
y
c
o
n
t
r
o
l
w
h
i
l
e
a
d
h
e
r
i
n
g
to all engineer’s safety requirements. DATE: 03/2020
liberty village neighborhooD & marine avenue Pavement rehabilitation, manhattan beach Mark served as Construction Inspector for the City of Manha t
t
a
n
B
e
a
c
h
f
o
r
t
h
e
r
e
h
a
b
i
l
i
t
a
t
i
o
n
o
f
a
p
p
r
o
x
i
m
a
t
e
l
y
2 0
,
6 0
0 feet of pavement on the Liberty Village Neighborhood and
M
a
r
i
n
e
A
v
e
n
u
e
P
a
v
e
m
e
n
t
R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
.
M
a
r
k
’
s
inspection work consisted of verifying the cold milling of exi s
t
i
n
g
p
a
v
e
m
e
n
t
a
n
d
o
v
e
r
l
a
y
w
i
t
h
r
u
b
b
e
r
i
z
e
d
a
s
p
h
a
l
t
,
A
C
paving, traffic striping and markings, and traffic loop repla c
e
m
e
n
t
.
I
n
a
d
d
i
t
i
o
n
,
t
h
e
p
r
o
j
e
c
t
i
n
v
o
l
v
e
d
c
o
n
c
r
e
t
e
r
e
p
a
i
r
,
which including sixty (60) ADA access ramp installations wit h
i
n
t
h
e
L
i
b
e
r
t
y
V
i
l
l
a
g
e
a
n
d
t
w
e
n
t
y
-
o
n
e
(
2 1
)
a
l
o
n
g
M
a
r
i
n
e
Avenue which also required curb repairs, sidewalk and cross g
u
t
t
e
r
r
e
p
l
a
c
e
m
e
n
t
s
.
DATE: 05/2019
resurFacIng Project, avenIDa barbosa & buena vIsta st. From avenIDa barbosa to cIty lImIts - P-1026, irwinDaleMark served as the Construction Inspector for the City of
I
r
w
i
n
d
a
l
e
o
n
t
h
i
s
g
r
i
n
d
a
n
d
o
v
e
r
l
a
y
p
r
o
j
e
c
t
w
i
t
h
p
r
o
j
e
c
t
limits located at Avenida Barbosa (between Buena Vista St r
e
e
t
a
n
d
A
r
r
o
w
H
i
g
h
w
a
y
)
a
n
d
B
u
e
n
a
V
i
s
t
a
(
f
r
o
m
A
v
e
n
i
d
a
Barbosa to the City Limits around Village Road). Constr u
c
t
i
o
n
e
n
t
a
i
l
s
s
e
p
a
r
a
t
e
b
i
d
s
c
h
e
d
u
l
e
s
f
o
r
t
h
e
w
o
r
k
o
n
Buena Vista Street and Avenida Barbosa (2” grind and overl a
y
w
i
t
h
a
s
s
o
c
i
a
t
e
d
s
t
r
i
p
i
n
g
)
a
s
w
e
l
l
a
s
a
n
a
l
t
e
r
n
a
t
e
b
i
d
for an additional 1” grind and overlay on the Avenida Barbo s
a
p
r
o
j
e
c
t
l
i
m
i
t
s
.
T
h
i
s
p
r
o
j
e
c
t
h
a
d
a
c
o
n
s
t
r
u
c
t
i
o
n
c
o
s
t
o
f
$600,000. DATE: 2021
la seDa Pavement slurry seal anD scrub Project - Phases I & II, los angeles Public works On the La Seda Pavement, Slurry and Scrub Project, Mark s
e
r
v
e
d
a
s
C
o
n
s
t
r
u
c
t
i
o
n
I
n
s
p
e
c
t
o
r
f
o
r
t
h
e
C
o
u
n
t
y
o
f
L
o
s
Angeles Public Works Department. The primary objective o f
t
h
i
s
p
r
o
j
e
c
t
w
a
s
t
o
p
r
e
s
e
r
v
e
5 m
i
l
e
s
o
f
r
e
s
i
d
e
n
t
i
a
l
r
o
a
d
s
,
located at the South San Jose Hills community, bounded b y
G
i
a
n
o
A
v
e
n
u
e
,
C
i
t
y
o
f
W
e
s
t
C
o
v
i
n
a
,
L
a
S
e
d
a
R
o
a
d
,
a
n
d
Valley Boulevard. The project was constructed in two phas e
s
.
P
h
a
s
e
1 i
n
c
l
u
d
e
d
p
a
v
e
m
e
n
t
,
s
i
d
e
w
a
l
k
a
n
d
c
r
o
s
s
w
a
l
k
,
rehabilitation and repair on all concrete related works includi n
g
t
h
e
p
r
e
p
a
r
a
t
i
o
n
a
n
d
i
n
s
t
a
l
l
a
t
i
o
n
o
f
m
i
s
s
i
n
g
s
i
d
e
w
a
l
k
s
.
Phase 2 included pavement preservation treatments. Additi o
n
a
l
p
r
o
j
e
c
t
w
o
r
k
r
e
q
u
i
r
e
m
e
n
t
s
i
n
c
l
u
d
e
d
c
o
s
t
e
s
t
i
m
a
t
i
n
g
,
Document Preparation, ADA curb ramp repair, signing and s t
r
i
p
i
n
g
.
DATE: 11/2020
lotus avenue Pavement Preservation, los angeles Public worksMark served as Construction Inspector for the County of Lo s
A
n
g
e
l
e
s
P
u
b
l
i
c
W
o
r
k
s
D
e
p
a
r
t
m
e
n
t
o
n
t
h
e
L
o
t
u
s
A
v
e
n
u
e
Pavement Preservation Project. The goal of the project w a
s
t
o
p
r
e
s
e
r
v
e
8 .
9 m
i
l
e
s
o
f
r
e
s
i
d
e
n
t
i
a
l
r
o
a
d
s
l
o
c
a
t
e
d
i
n
the community of East Pasadena bounded by Del Mar Boul
e
v
a
r
d
,
R
o
s
e
m
e
a
d
B
o
u
l
e
v
a
r
d
,
H
u
n
t
i
n
g
t
o
n
D
r
i
v
e
,
a
n
d
t
h
e
Cities of San Marino and Pasadena. The scope included
p
a
v
e
m
e
n
t
p
r
e
p
-
w
o
r
k
,
p
a
r
k
w
a
y
i
m
p
r
o
v
e
m
e
n
t
s
,
c
o
n
c
r
e
t
e
panels along roadways and driveway approaches, and c
u
r
b
r
a
m
p
s
u
p
g
r
a
d
e
s
.
T
h
e
p
r
o
p
o
s
e
d
c
o
n
s
t
r
u
c
t
i
o
n
w
o
r
k
involved micro-milling to improve road ride-ability, scrub se a
l
t
o
s
e
a
l
e
x
i
s
t
i
n
g
c
r
a
c
k
s
,
a
n
d
s
l
u
r
r
y
s
e
a
l
t
o
p
r
e
s
e
r
v
e
t
h
e
pavement and provide a smoother, more finished driving su r
f
a
c
e
.
M
a
r
k
p
r
o
v
i
d
e
d
p
r
o
j
e
c
t
c
o
s
t
e
s
t
i
m
a
t
i
o
n
s
,
d
o
c
u
m
e
n
t
preparation including environmental study documents, and
p
r
e
l
i
m
i
n
a
r
y
d
e
s
i
g
n
.
DATE: 01/2019PellIser vIllage concrete restoratIon, los angeles Public worksMark served as Construction Inspector for the County of L
o
s
A
n
g
e
l
e
s
P
u
b
l
i
c
W
o
r
k
s
D
e
p
a
r
t
m
e
n
t
o
n
t
h
e
P
e
l
l
i
s
e
r
Village Concrete Restoration Project, located at Banducci R
o
a
d
,
f
r
o
m
S
t
a
l
l
i
o
n
S
p
r
i
n
g
s
D
r
i
v
e
t
o
P
e
l
l
i
s
e
r
R
o
a
d
.
M
a
r
k
was responsible with overseeing project cost estimations, p
a
v
e
m
e
n
t
a
n
d
s
t
r
i
p
i
n
g
i
n
s
t
a
l
l
a
t
i
o
n
,
r
e
h
a
b
i
l
i
t
a
t
i
o
n
,
r
e
p
a
i
r
and improvement, and document preparation. This safety
a
n
d
c
o
m
p
l
e
t
e
s
t
r
e
e
t
c
o
m
p
o
n
e
n
t
p
r
o
j
e
c
t
c
o
n
s
i
s
t
e
d
,
i
n
general, of paving approximately 1.3 miles of roadway should e
r
s
.
T
h
e
g
o
a
l
o
f
t
h
e
p
r
o
j
e
c
t
w
a
s
t
o
h
e
l
p
a
l
l
e
v
i
a
t
e
t
h
e
P
M
-
10 problem in the area, create added safety for motorists a n
d
a
v
o
i
d
p
o
t
e
n
t
i
a
l
a
c
c
i
d
e
n
t
-
r
i
s
k
s
i
t
u
a
t
i
o
n
s
b
y
p
r
o
v
i
d
i
n
g
a
paved surface that would allow for easier vehicle handling, w
h
i
l
e
a
l
s
o
p
r
o
v
i
d
i
n
g
a
d
d
i
t
i
o
n
a
l
d
r
i
v
i
n
g
c
o
r
r
e
c
t
i
o
n
r
o
a
d
w
a
y
and reduce “run off the road” type of accidents. DATE: 2018 RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
J
, L
ron oStendorf
construction insPector
29 yearS of exPerience6
yearS witH Firm
FielDs oF exPertise:
ROADWAY PAVEMENT ADA RAMP SIDEWALK WIDENING
qualIFIcatIons
construction management & coDes coursework: Saddleback College • raDiation saFety oFFicer:
Nuclear Gauges • certiFicate: Nuclear Density & Moisture Operation • caltrans certiFicate ProFiciency:
125- Sample Highway Materials; 231- Compaction of Soils Aggregates backgrounD
Ron is a Construction Inspector with 29 years of experience in the public and commercial sectors. Ron worked for 26 years as a Construction Inspector for multiple geotechnical firms. His typical duties have included providing daily construction reports, documenting labor and equipment on-site each day and hours worked, observation and testing of fill placement, measuring, calculating, and recording all construction quantities, as well as taking work and site photos. Ron’s experience includes a plethora of projects, and he advocates safety and quality at the jobsite. His accuracy and efficiency in the field ensure a successful project. Ron will always advocate tirelessly on behalf of the city’s interests, stressing efficiency and proper time management throughout the work. exPerIence
granD ave. beautiFication Project, FeDeral Project hPlul-5455 (016), DIamonD bar Ron provided construction inspection services to the City of Diamond Bar for the Grand Avenue Beautification Project. The project consisted of traffic signal equipment replacement, landscape and irrigation improvements, decorative crosswalks, and asphalt pavement rehabilitation of Grand Avenue at Diamond Bar Boulevard and Grand Avenue at Longview Drive. New decorative traffic signal poles and mast arms were installed within in the existing right-of-way. Several signal foundations required removal and, due to utility locations, the placement of temporary signal equipment to place a new foundation in the same location. Two of the signal foundations required re-design and engineering calculations due to utility conflicts. A decorative City monument sign was installed east of the Longview Drive city limit, and decorative pre-cast concrete posts and wood rails were installed along the sidewalks and median islands. This was tied together with irrigation, landscaping, tree wells with tree grates including in- ground up-lighting for the parkway trees, and median landscaping with decorative rocks set in a concrete bed. Work also included the installation of decorative sidewalks and ADA ramps with colored concrete and decorative pavers at each intersection. Due to the traffic volume on Grand Avenue, this work was scheduled and coordinated in two phases: inside and outside lanes over two weekends. The removals began on Friday evening, concrete was formed and poured on Saturday, pavers were installed on Sunday, and full traffic operations were restored for the Monday morning peak traffic. The work was completed on time. DATE: 2015 telegraPh roaD meDian ImProvements & rehabilitation, PIco rIvera Ron provided inspection Services to the City of Pico Rivera on the Telegraph Road Landscape Median Improvements Project. The project limits were on Telegraph Road, between Rosemead Boulevard and Passons Boulevard and on Rosemead Boulevard between Telegraph Road and Vista Del Rosa. This high profile project was funded by the Federal Highway Safety Improvement Program (HSIP) and Proposition C. A portion of the project limits were in the City of Downey, and multi-agency coordination was essential to the success of the project. Telegraph Road is a major residential and commercial thoroughfare running east-west. The roadway rehabilitation comprised of reconstruction of heavily deteriorated areas, including the Telegraph Road and Lindell Avenue intersection. The work also included a
2.5” grind and ARHM overlay. The project also called for curb and gutter, sidewalk, curb ramps, and landscape median improvements. The landscape component entailed fine grading, automatic irrigation installation, constructing SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower -160-
¢/\
_l_/
13.4; a; El. ’PEI’JmJ’" -:.
/
I)
1;“; mm. nil“.
a moisture barrier, and placement of over 16,000 tons of m u
l
c
h
,
n
e
a
r
l
y
2 ,
0 0
0 s
h
r
u
b
s
,
8 5
t
r
e
e
s
,
a
n
d
5 0
b
r
o
w
n
t
r
u
n
k
palms. This project was hailed as a landmark project for the C
i
t
y
,
a
n
d
a
r
i
b
b
o
n
c
u
t
t
i
n
g
c
e
r
e
m
o
n
y
w
a
s
h
e
l
d
t
o
c
e
l
e
b
r
a
t
e
the completion of work. DATE: 03/2013-09/2013
citywiDe resiDential street rehabilitation Project, PlacentiaRon provided inspection services to the City of Placentia fo r
t
h
e
C
i
t
y
w
i
d
e
R
e
s
i
d
e
n
t
i
a
l
S
t
r
e
e
t
R
e
h
a
b
i
l
i
t
a
t
i
o
n
P
r
o
j
e
c
t
.
The project was funded by a variety of sources including
G
a
s
T
a
x
,
P
r
o
p
o
s
i
t
i
o
n
1 B
,
M
e
a
s
u
r
e
M
1 ,
a
n
d
M
e
a
s
u
r
e
M
2 .
The analysis included 75 miles of roadway and the actual d
e
s
i
g
n
s
p
a
n
n
e
d
3 5
m
i
l
e
s
.
T
h
e
s
c
o
p
e
o
f
w
o
r
k
e
n
t
a
i
l
e
d
rehabilitating the roadway using primarily Type II slurry s e
a
l
,
c
h
i
p
s
e
a
l
,
a
n
d
p
o
r
t
i
o
n
s
o
f
f
u
l
l
R
&
R
.
T
h
e
f
i
n
a
l
d
e
s
i
g
n
included rehabilitating 41% of the City’s residential roadwa y
s
,
i
n
c
l
u
d
i
n
g
1 0
9 n
e
w
A
D
A
c
o
m
p
l
i
a
n
t
c
u
r
b
r
a
m
p
s
,
5 ,
4 4
5 tons of slurry, 105,050 SY of chip seal, grind and overlay wit h
3 5
,
0 0
0 t
o
n
s
o
f
A
C
p
a
v
i
n
g
,
a
d
j
u
s
t
i
n
g
2 0
9 m
a
n
h
o
l
e
s
a
n
d
369 water valves, and 2,363 LF of curb and gutter. OE revie w
e
d
t
h
e
C
i
t
y
’
s
2 0
1 1
P
a
v
e
m
e
n
t
M
a
n
a
g
e
m
e
n
t
R
e
p
o
r
t
,
a
n
d
completed a reconnaissance field survey to better unders t
a
n
d
t
h
e
e
x
i
s
t
i
n
g
p
a
v
e
m
e
n
t
c
o
n
d
i
t
i
o
n
s
.
T
h
e
f
i
e
l
d
s
u
r
v
e
y
included walking each proposed roadway to make recomme
n
d
a
t
i
o
n
s
f
o
r
n
e
c
e
s
s
a
r
y
l
o
c
a
l
i
z
e
d
A
C
R
&
R
p
a
t
c
h
e
s
,
a
n
d
t
o
identify damaged curb & gutter and uplifted, or non-ADA c o
m
p
l
i
a
n
t
s
i
d
e
w
a
l
k
s
.
T
h
e
p
r
o
j
e
c
t
a
l
s
o
r
e
q
u
i
r
e
d
p
r
o
v
i
d
i
n
g
a
location matrix with photographs for each recommended re p
a
i
r
,
a
l
o
n
g
w
i
t
h
t
h
e
e
s
t
i
m
a
t
e
d
b
u
d
g
e
t
a
l
l
o
c
a
t
i
o
n
f
o
r
e
a
c
h
location and work item. DATE: 06/2012-11/2012
atlantic avenue & Firestone boulevarD Intersection ImProvements, south gateRon provided inspection services for the City of South Gate
o
n
t
h
i
s
$
6 m
i
l
l
i
o
n
p
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
l
i
m
i
t
s
w
e
r
e
o
n
t
w
o
arterial streets: Atlantic Avenue from Firestone Boulevard to P a
t
a
t
a
S
t
.
(
1 ,
3 0
0 L
F
)
a
n
d
F
i
r
e
s
t
o
n
e
B
o
u
l
e
v
a
r
d
,
f
r
o
m
D
o
r
o
t
h
y
Avenue to Atlantic Ave. (2,200 LF). The project involved the wi d
e
n
i
n
g
a
n
d
r
e
a
l
i
g
n
m
e
n
t
o
f
t
h
e
i
n
t
e
r
s
e
c
t
i
o
n
t
o
i
n
c
r
e
a
s
e
t
h
e
number of thru, left turn lanes, the length of turn pockets, an d
r
i
g
h
t
t
u
r
n
l
a
n
e
s
.
I
n
a
d
d
i
t
i
o
n
t
o
t
h
e
w
i
d
e
n
i
n
g
,
t
h
e
s
c
o
p
e
entailed a concrete approach to the intersection; concret e
i
n
t
e
r
s
e
c
t
i
o
n
;
g
r
i
n
d
a
n
d
A
R
H
M
o
v
e
r
l
a
y
;
f
o
u
r
l
e
g
s
o
f
t
h
e
intersection; 50,000 SF of sidewalk, 1,850 LF of curb and gutte r
,
2 ,
1 0
0 L
F
o
f
D
I
P
w
a
t
e
r
l
i
n
e
a
n
d
2 ,
8 4
0 L
F
o
f
r
e
c
y
c
l
e
d
w
a
t
e
r
l
i
n
e
,
and 4,656 LF of median island curb with decorative landscapin g
a
n
d
a
c
i
t
y
m
o
n
u
m
e
n
t
s
i
g
n
.
T
h
i
s
p
r
o
j
e
c
t
w
a
s
f
u
n
d
e
d
w
i
t
h
Measure R, MTA and other state funding sources, and requir e
d
t
h
e
p
r
e
p
a
r
a
t
i
o
n
o
f
a
n
a
w
a
r
d
p
a
c
k
a
g
e
a
n
d
t
h
e
c
o
n
t
i
n
u
e
d
upkeep of project files, invoices, reports and submittals in a c
c
o
r
d
a
n
c
e
w
i
t
h
C
a
l
t
r
a
n
s
’
L
A
P
M
.
DATE: 10/2012-05/2013rosini & rosewooD rehabilitation Project - Phase II, commerceRon was the construction inspector for the City of Com m
e
r
c
e
o
n
P
h
a
s
e
I
I
o
f
t
h
i
s
p
o
l
i
t
i
c
a
l
l
y
-
s
e
n
s
i
t
i
v
e
r
e
s
i
d
e
n
t
i
a
l
reconstruction project. The $1.4 million project spanned 6, 9 6
0 L
F
o
f
r
e
c
o
n
s
t
r
u
c
t
i
o
n
,
u
t
i
l
i
z
i
n
g
F
u
l
l
D
e
p
t
h
R
e
c
l
a
m
a
t
i
o
n
(FDR). The scope included excavating 14 inches of roadway, tr e
a
t
i
n
g
a
1 0
-
i
n
c
h
s
e
c
t
i
o
n
o
f
b
a
s
e
w
i
t
h
c
e
m
e
n
t
,
a
d
j
u
s
t
i
n
g
3 3
manholes and 19 valve lids, installing loops, and traffic stripi n
g
.
F
u
r
t
h
e
r
m
o
r
e
,
t
h
e
p
r
o
j
e
c
t
e
n
t
a
i
l
e
d
c
o
n
d
u
c
t
i
n
g
a
p
a
v
e
m
e
n
t
investigation, including a traffic count analysis, and review of c
u
r
b
,
g
u
t
t
e
r
a
n
d
s
i
d
e
w
a
l
k
t
o
d
e
s
i
g
n
a
n
e
n
d
u
r
i
n
g
s
o
l
u
t
i
o
n
.
T
h
e
plans included a full plan and profile and signing and striping p l
a
n
s
f
o
r
a
l
l
r
o
a
d
w
a
y
s
.
DATE: 08/2012-06/2013resiDential area 7 & arterial zone 5 roaD maintenance, DIamonD barRon was the inspector on the Area 7 and Arterial Zone 5 Ro a
d
M
a
i
n
t
e
n
a
n
c
e
P
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
D
i
a
m
o
n
d
B
a
r
.
T
h
e
limits of this project included a total of 19.5 centerline mile s
o
f
r
e
s
i
d
e
n
t
i
a
l
,
c
o
l
l
e
c
t
o
r
a
n
d
a
r
t
e
r
i
a
l
s
t
r
e
e
t
s
w
i
t
h
i
n
t
h
e
city. The scope of work included rehabilitation of the road w
a
y
u
s
i
n
g
p
r
i
m
a
r
i
l
y
s
l
u
r
r
y
s
e
a
l
a
n
d
c
h
i
p
s
e
a
l
m
e
t
h
o
d
s
.
I
n
areas of extreme degradation, an asphalt overlay or full wid t
h
g
r
i
n
d
a
n
d
r
e
p
l
a
c
e
m
e
n
t
w
a
s
r
e
c
o
m
m
e
n
d
e
d
d
e
p
e
n
d
i
n
g
on funding availability. In order to provide an accurate des i
g
n
,
a
f
i
e
l
d
w
a
l
k
w
a
s
c
o
o
r
d
i
n
a
t
e
d
t
o
n
o
t
e
a
n
y
n
e
c
e
s
s
a
r
y
localized AC removal and replacement patches, damaged
c
u
r
b
&
g
u
t
t
e
r
,
a
n
d
n
o
n
-
A
D
A
c
o
m
p
l
i
a
n
t
s
i
d
e
w
a
l
k
s
.
T
h
i
s
full breadth field survey also included the correlation of fi e
l
d
w
o
r
k
i
t
e
m
s
t
h
r
o
u
g
h
p
h
o
t
o
g
r
a
p
h
s
a
n
d
t
a
b
l
e
s
i
n
o
r
d
e
r
to ensure that the full scope of work was identified. The be s
t
r
e
h
a
b
i
l
i
t
a
t
i
o
n
m
e
t
h
o
d
w
a
s
r
e
c
o
m
m
e
n
d
e
d
t
o
t
h
e
C
i
t
y
,
based on existing field conditions and the allotted project b u
d
g
e
t
.
DATE: 11/2010-04/2011
hacienDa roaD & east roaD stimulus Project, la habra heIghtsRon was an inspector for the Hacienda Road & East Stimulus
p
r
o
j
e
c
t
f
o
r
t
h
e
C
i
t
y
o
f
L
a
H
a
b
r
a
H
e
i
g
h
t
s
.
T
h
e
p
r
o
j
e
c
t
w
a
s
funded by the ARRA, and spanned Hacienda Road, from the n
o
r
t
h
c
i
t
y
l
i
m
i
t
s
t
o
A
v
o
c
a
d
o
,
a
n
d
E
a
s
t
R
o
a
d
f
r
o
m
H
a
c
i
e
n
d
a
Road to Fullerton Road. The scope of work included roadway r
e
h
a
b
i
l
i
t
a
t
i
o
n
w
i
t
h
a
r
e
a
s
b
e
i
n
g
R
e
m
o
v
e
d
&
R
e
p
l
a
c
e
d
w
i
t
h
a full structural section 16-inches deep and grind & overlay i n
o
t
h
e
r
a
r
e
a
s
.
T
h
e
p
r
o
j
e
c
t
a
l
s
o
i
n
c
l
u
d
e
d
p
r
o
v
i
d
i
n
g
e
r
o
s
i
o
n
control by re-compacting an adjacent slope and installing ri p
r
a
p
,
i
n
s
t
a
l
l
i
n
g
m
e
t
a
l
g
u
a
r
d
r
a
i
l
i
n
g
a
n
d
t
r
a
f
f
i
c
l
o
o
p
s
,
a
n
d
improving drainage with new rolled curb and gutter, v-ditch i n
s
t
a
l
l
a
t
i
o
n
s
,
a
n
d
r
e
l
o
c
a
t
i
n
g
s
e
v
e
r
a
l
e
x
i
s
t
i
n
g
u
t
i
l
i
t
i
e
s
.
W
i
t
h
t
h
e
roads providing single lane access to and from adjacent neig h
b
o
r
h
o
o
d
s
,
c
a
r
e
f
u
l
a
t
t
e
n
t
i
o
n
w
a
s
g
i
v
e
n
t
o
p
r
o
j
e
c
t
p
h
a
s
i
n
g
and traffic control design. During the bid and construction p h
a
s
e
s
,
i
t
w
a
s
e
n
s
u
r
e
d
t
h
a
t
t
h
e
p
r
o
j
e
c
t
a
d
h
e
r
e
d
t
o
C
a
l
t
r
a
n
s
’
Local Assistance Procedures Manual, and took care of all Cal t
r
a
n
s
p
a
p
e
r
w
o
r
k
r
e
q
u
i
r
e
d
f
o
r
E
-
7 6
a
p
p
r
o
v
a
l
a
n
d
c
l
o
s
e
o
u
t
.
E-76 permits set strict documentation and submittal schedu l
e
r
e
q
u
i
r
e
m
e
n
t
s
f
o
r
t
h
e
p
r
e
-
b
i
d
p
h
a
s
e
,
a
s
w
e
l
l
a
s
s
t
r
i
c
t
l
a
b
o
r
compliance documentation requirements for closing out a pro j
e
c
t
t
o
e
n
s
u
r
e
f
u
n
d
i
n
g
r
e
m
a
i
n
s
a
v
a
i
l
a
b
l
e
.
DATE: 2019
SECTION 6.1.1.2: Staffing
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
J
, L
armando r. caStaÑeda
construction InsPector
9 yearS of exPerience2
yearS witH Firm
FielDs oF exPertise:
WATER
PARK
SEWER
ADA RAMP
ROADWAY
qualIFIcatIons
certIFIeD Construction Inspection Workshop, Amer ican Public Works Association • certIFIeD Public Works Administration – MSA Educational Workshop Series, Maintenance Superintendents Association (MSA) reInForceD concrete InsPectIon • Protector Del agua traInIng Program – Plant Materials for Water Conservation; Irrigation Principles (Repair, Troubleshooting, Controller Programming, Scheduling), MWD - Metropolitan Water District of Southern California • trench shorIng anD excavatIon saFety, United Rentals • clca’s IrrIgatIon semInar, Valve Trouble Shooting; Wire Tracing; Water Management; Controller Programming, California Landscape Contractors Association • soIl mgmt./lanDscaPe DesIgn, Cal Poly Pomona • hazarDous waste oPeratIons & emergency resPonse, Pacific Safety Council backgrounD
Armando Castañeda has developed 9 years of experience in many aspects of construction inspection, having first joined Albert A. Webb Associates between 2005 to 2009 serving as construction inspector. His inspection experiences has involved completing both public and private projects encompassing water and sewer main and lateral line construction; grading; asphalt; irrigation system installation; landscaping; MUSCO field lighting installations; masonry; and electrical and plumbing. In addition, Armando has performed inspection of landscape maintenance projects for the City of Riverside, including verifying compliance with project specifications. His extensive education, training, and experience in the fields of public works, landscaping, and construction allows him to be assigned to a multitude of various projects. Armando has extended his extensive inspection experience as a construction inspector to residential, commercial, and industrial development projects. exPerIence
state street PiPeline rePlacement Project, monte vista water District Armondo served the Monte Vista Water District (MVWD) as construction inspector on the State Street Pipeline Replacement Project. The project consisted of over 7,000 LF of 12” water mainline. Armondo inspected 14 connection locations on water and fire services lines ranging from 2” to 12”, checking for compliance per plan specifications, materials, proper backfilling and compaction. He also performed inspections of the water service line to existing meters consisting of DL pipe with 45 and 90 degree bends to C900 PVC pipeline, and he inspected service meter box’s concrete installation. DATE: 2019
juruPa community services District’s PiPelines installation at cantu-galleano ranch roaD, riversiDe
Armando served as Construction Inspector for the County of Riverside’s Jurupa Community Services District’s Pipelines Installation Project, located at Cantu-Galleano Ranch Road which contained 3150 feet LF. of 16” CML/CMC Recycled Water and 2058 feet LF of 18” CML/CMC Domestic Water. Armando’s services as construction inspector involved a 16” CML/CMC fully welded Recycled Water line, which included the pipeline through the Cantu-Galleano Ranch Road Bridge in 24” Steel Casing, as well as the 18” CML/CMC fully welded Domestic Water line which also included the pipeline through the Cantu-Galleano Ranch Rd Bridge in 24” Steel Casing as well as an extra 22” steel casting pipeline for future use. Armando was additionally responsible for the installation of the 16” fully welded CML/ CMC and 18” fully welded CML/CMC pipelines per the manufacturer’s lay drawings, keeping the ends of the pipes covered and protected from contaminants until installed, as well as monitoring the fully welded (2 pass) welded joints for any backfill and bacterial disinfections. The project had a cost of approximately $11 million. DATE: 2023
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower SECTION 6.1.1.2: Staffing
-162-
’—
\
11.4; 0; EXPERIENCE
\f‘)
_l
1;...:. ,mn ruin.
centex, lennar, Dr horton, & kb homes water line & sewer insPectionsArmando served as Construction Inspector for the Centex, L
e
n
n
a
r
,
D
R
H
o
r
t
o
n
,
a
n
d
K
B
H
o
m
e
s
W
a
t
e
r
L
i
n
e
s
a
n
d
S
e
w
e
r
inspections needs. Alongside material verification, Arman d
o
p
e
r
f
o
r
m
e
d
i
n
s
p
e
c
t
i
o
n
s
o
n
a
l
l
o
f
t
h
e
w
a
t
e
r
m
a
i
n
l
i
n
e
service lines. The lines ranged from 8 inches to 12 inches in
p
i
p
i
n
g
c
o
n
s
t
r
u
c
t
e
d
o
f
C
9 0
0 P
V
C
a
n
d
d
u
c
t
i
l
e
i
r
o
n
w
i
t
h
a
housing track and fully welded joints. Additional inspection s
i
n
c
l
u
d
e
d
s
e
w
e
r
p
i
p
e
s
w
i
t
h
s
i
z
e
s
r
a
n
g
i
n
g
f
r
o
m
1 0
i
n
c
h
e
s
to 30 inches. Sewer air and video testing was performed on i
n
-
p
i
p
e
g
r
a
d
e
s
,
f
i
r
e
h
y
d
r
a
n
t
s
,
b
l
o
w
o
f
f
,
p
r
e
s
s
u
r
e
t
e
s
t
i
n
g
,
and manhole installation, and waterline chlorine disinfectio n
w
a
s
p
e
r
f
o
r
m
e
d
f
o
r
b
a
c
t
e
r
i
a
l
s
a
m
p
l
i
n
g
.
DATE: 2018haraDa heritage Park lanDscaPe imProvements, Phase 2, riversiDe countyAs the Construction Inspector for the County of Riverside
o
n
t
h
e
H
a
r
a
d
a
H
e
r
i
t
a
g
e
P
a
r
k
L
a
n
d
s
c
a
p
e
I
m
p
r
o
v
e
m
e
n
t
s
Project, Phase 2, Armando provided inspections for app
r
o
x
i
m
a
t
e
l
y
$
5 .
7 m
i
l
l
i
o
n
w
o
r
t
h
o
f
t
h
e
p
r
o
j
e
c
t
r
e
q
u
i
r
e
d
landscape improvements. Details of the project included ins t
a
l
l
i
n
g
i
r
r
i
g
a
t
i
o
n
s
y
s
t
e
m
s
;
e
l
e
c
t
r
i
c
a
l
;
m
a
s
o
n
r
y
b
l
o
c
k
w
a
l
l
s
;
two baseball fields; lighting for five soccer fields; walkways; 1 6
0 0
s
q
u
a
r
e
f
e
e
t
o
f
b
u
i
l
d
i
n
g
c
o
n
c
e
s
s
i
o
n
s
;
p
l
u
m
b
i
n
g
a
n
d
restrooms; two retaining walls; grading; parking lot pavin g
;
s
h
e
l
t
e
r
s
;
p
a
r
k
a
m
e
n
i
t
i
e
s
;
a
n
d
u
n
d
e
r
g
r
o
u
n
d
w
a
t
e
r
a
n
d
sewer lines. DATE: 2020
orcharD Park well site lanDscaPing anD block wall, riversiDe countyArmando was responsible of the inspection of all landsca p
i
n
g
,
i
r
r
i
g
a
t
i
o
n
s
y
s
t
e
m
,
w
a
t
e
r
d
i
s
t
r
i
c
t
b
o
o
s
t
e
r
p
u
m
p
,
a
n
d
block wall protection. DATE: 2021
ceDar creek Park Phase 2, riversiDe countyArmando was responsible of the inspection of landscapin g
,
i
r
r
i
g
a
t
i
o
n
,
w
a
t
e
r
a
n
d
s
e
w
e
r
s
e
r
v
i
c
e
s
,
a
n
d
w
a
t
e
r
p
a
r
k
features. DATE: 2018
District water anD sewer Facility InsPection, riversiDe county, caArmando served as an inspector for the Riverside County a n
d
w
a
s
r
e
s
p
o
n
s
i
b
l
e
o
f
i
n
s
p
e
c
t
i
n
g
t
h
e
D
i
s
t
r
i
c
t
W
a
t
e
r
a
n
d
Sewer Facility. DATE: 2018
golDen state water comPany, yorba linDaArmando was responsible of the inspection of removi n
g
a
n
d
r
e
p
l
a
c
i
n
g
a
l
l
w
a
t
e
r
m
a
i
n
s
e
r
v
i
c
e
l
i
n
e
s
t
o
t
h
e
condemedium complex. DATE: 2019
water main rePlacement, wattsArmando was responsible of the replacement of water main a
n
d
s
e
r
v
i
c
e
l
i
n
e
w
h
i
c
h
i
n
c
l
u
d
e
s
1 0
0 f
e
e
t
o
f
2 4
I
n
c
h
d
u
c
t
i
l
e
iron pipes which included hot tapping for service lateral line.
DATE: 2020
Interstate-215 segment 2. caltrans lanDscaPe rePlacement Project, caltransArmondo provided Inspection services on the I-215 Segmen t
2 C
a
l
t
r
a
n
s
L
a
n
d
s
c
a
p
e
R
e
p
l
a
c
e
m
e
n
t
P
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
consisted of irrigation booster pump, irrigation controllers, v a
l
v
e
a
n
d
a
s
s
e
m
b
l
y
o
v
e
r
3 9
,
0 0
0 l
f
o
f
s
c
h
e
d
u
l
e
4 0
,
1 i
n
c
h
t
o
3 inch PVC pipe, over 200 sprinklers, 36” box trees, 18 24” box
s
h
r
u
b
s
,
a
n
d
o
v
e
r
1 ,
0 0
0 s
h
r
u
b
s
.
DATE: 2020sr-210 baseline Project, highlanD, ca. sbctaArmondo provided construction inspection on the SR-2 1 0
B
a
s
e
l
i
n
e
P
r
o
j
e
c
t
.
T
h
e
p
r
o
j
e
c
t
r
e
q
u
i
r
e
d
i
n
s
t
a
l
l
a
t
i
o
n
per plans and specification compliances which included s c
h
e
d
u
l
e
4 0
P
V
C
1 2
,
0 9
0 L
F
,
c
l
a
s
s
3 1
5 P
V
C
4 ,
9 5
5 L
F
,
4 ,
8 3
4 plants, placement of 19 4’X3’ and 13 6’X4’ boulders, 4” to 8” ro c
k
b
l
a
n
k
e
t
p
l
a
c
e
d
-
i
n
,
6 i
n
c
h
e
s
o
f
c
o
n
c
r
e
t
e
(
9 7
,
9 3
8 s
q
f
t
)
,
decorative stamp concrete (13,956 sq ft), hydroseeding (250 ,
5 3
5 s
q
f
t
)
,
a
n
d
c
o
m
p
o
s
t
s
p
r
e
a
d
i
n
g
(
2 ,
3 2
0 c
y
)
.
DATE: 2019Phase 1a, roaDway anD utility imProvement bob hoPe Dr. anD romona rD. street imProvement Armondo was the inspector of compaction testing, grating, a
n
d
i
n
s
t
a
l
l
a
t
i
o
n
o
f
1 6
9 ,
3 3
2 s
q
f
t
4 ”
A
C
p
a
v
e
m
e
n
t
,
6 ”
t
o
8 ”
curb and gutter (8,731 lf), 4 access ramps, mandering bike p
a
t
h
4 ”
o
f
c
o
n
c
r
e
t
e
1 2
,
9 9
1 s
q
f
t
,
3 c
u
r
b
i
n
l
e
t
c
a
t
c
h
b
a
s
i
n
,
12” to 18” storm drain pipe (255 lf), spandrels and cross gutte r
s
(
1 ,
1 6
0 s
q
f
t
)
,
2 ,
1 5
3 s
q
f
t
o
f
s
i
d
e
w
a
l
k
,
8 ”
t
o
1 2
”
P
V
C
s
e
w
e
r
main (4,901 lf), 16 48” sewer manhole, 6” wet barrel fire hy d
r
a
n
t
,
j
a
c
k
a
n
d
b
o
r
e
2 4
”
X
3 /
4 ”
s
t
e
e
l
c
a
s
i
n
g
(
3 1
3 l
f
)
,
1 8
”
D
I
polyethylene in-case water main (1,954 lf). DATE: 2015
RFP for On-Call Construction Management and Inspection Ser v
i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower
SECTION 6.1.1.2: Staffing
-163-
J
, L
el monte santa anIta actIve transPortatIon Program, cycle 5 atP,Phase I, II, & III Majdi Ataya Muhammad Ludy Smeets Kevin Green
Project
team
OE provided Construction Management and inspection services for the City of El Monte on the Santa Anita Active Transportation Program, Cycle 5 ATP Project. The purpose of this project was to improve safety for roadway users and to improve conditions for non-motorized modes of travel, thereby promoting pedestrian cycle and transit use.
In doing so, the intent was to improve neighborhood connectivity and livability, and to enhance the comfort of non- motorized users traveling to and from the El Monte Transit Center and Downtown El Monte. The work entailed roadway rehabilitation, parkway improvements that involved 51 ADA curb ramps, 4,000 square feet of sidewalk, and 200 linear feet of curb and gutter, and upgrades to video detection and traffic signals at 7 intersections, along with wayfinding sign and bike rack installation at various intersections. The project was split into 3 phases. Phase I involved class II bike lane installation along 0.53 miles at Santa Anita Avenue, from Tyler Avenue to Lower Azusa Road; Phase II had pavement, curb and ramp upgrades at Tyler Avenue, from Ramona Boulevard to Santa Anita Boulevard for .97 miles; and Phase III entailed pavement, curb and ramp upgrades located at Ramona Boulevard, from Santa Anita Avenue to Tyler Avenue for .36 miles..
•Reference: John Rico, Associate Engineer, [email protected], (626) 580-2058 11333 Valley Boulevard, El Monte, CA 91731-3293 •Date of the project: 09/2023 •Status of the project: Completed •Cost: $134,700 (FEDERAL FUNDED) norwalk norwalk transit system (nts) bus stoP imProvement, Phase 1 (Fta FunDeD) Majdi Ataya Muhammad Chino Consunji
P roject
team
OE provided Design Engineering, Construction Management and Construction Inspection services to the City of Norwalk on the Bus Stop Improvement Project, Phase 1. The City’s Transit System was in need of a revamping of the City’s 166 bus stops, with a new bus stop addition within the City of Santa Fe Springs. Each bus stop required a variety of any one of the following upgrades: solar power equipt shelters; seating; trash receptacles; and signs built for real-time posting. OE was tasked with signage installation at 73 of the City’s bus stops along Routes 1 and 4, along with upgrading a further 9 stops. OE provided PES/Environmental preparations, base map and maintenance plan development, concept plans for bus stops, as well as a thorough field survey of all of the bus stops which included the use of drone surveying. OE’s contribution required 60 working days out of the project’s duration of approximately 18 months from the notice to proceed, with an estimated total project cost of $1.5 million, funded by the Federal Transit Administration (FTA).
•Reference: Janet Welde, Senior Management Analyst, (562) 929-5600, [email protected], 12700 Norwalk Boulevard, Rm.6, Norwalk, CA 90650
•Date of the project: 02/2024-05/2024•Status of the project: Completed •Cost: $190,684 (FEDERAL FUNDED) downey garDenDale street Pavement rehabilitation, FeD stPl 5334 (047) Majdi Ataya Muhammad Ludy Smeets
P roject
team
OE provided construction management and inspection services to the City of Downey for the Gardendale Street Pavement Rehabilitation Project. The project involved the reconstruction of failed pavement sections, cold-milling of the existing pavement, subgrade compaction, and construction of an asphalt pavement base course, leveling course, and rubberized asphalt overlay. The scope of work also included the installation of new fire hydrants, repairs to water mains, and water main installations through pressure testing and flushing. Concrete improvements included curbs, gutters, cross-gutter spandrels, alley approaches, cross gutters, ADA-compliant ramps, and sidewalks, as well as adjusting manholes and utility covers to grade, survey monument preservation and restoration, installation of traffic loops, signing and striping for one lane in each direction, and Class II bike lanes. The work was completed on time. •Reference: Desi Gutierrez, PE, Senior Civil Engineer, (562)622-3468, [email protected], 11111 Brookshire Avenue. Downey, CA 90241
•Date of the project: 2017 •Status of the project: Completed •Cost: $2,168,683.00 (FEDERAL FUNDED) project experience & referenceS6.1.1.36.1.1.3
SECTION 6.1.1.3: Project Experience & References
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 41 -164-
San bernardino “e” street rehabilitation Project
Majdi Ataya Muhammad Ludy Smeets
P roject
team
OE provided Construction Management and Inspection Services on the E Street Rehabilitation Project in San Bernardino. This project entailed pavement rehabilitation of “E” Street, from 300 feet northerly of 10th Street to Highland Avenue. This project was a joint effort between Omnitrans and the City of San Bernardino. The project was funded with Federal Transit Administration (FTA) monies. The project consisted of removal and reconstruction of various concrete improvements, including curb ramps, sidewalk, driveway approaches, curb, curb gutter, cross gutter, spandrel; repair of existing PCC culverts; roadway mill; water service lateral/ main, and meter removal and replacement; construct bus lanes by removing asphalt concrete pavement and underlining Portland cement concrete pavement; application of traffic striping and paving markings. •Reference: Michael W. Grubbs, MS, PE, Project Manager, (909) 384-5179, [email protected], 201 N. E Street, 2rd Floor, San Bernardino, CA 92401
•Date of the project: 2017 •Status of the project: Completed •Cost: $149,000 (FEDERAL FUNDED) redondo beacH aviation boulevarD resurFacing Project (stPl) Majdi Ataya Ludy Smeets
P roject
team
OE provided design engineering and construction management services for the City of Redondo Beach on the federally funded street resurfacing project along Aviation Boulevard from Manhattan Beach Boulevard to Marine Avenue. The project included developing the Preliminary Environmental Study (PES) and submitting it to Caltrans. The design scope included a 2-inch cold-mill, a 5-inch AC removal, some areas of full-depth removal and replacement, ADA improvements for curb ramps, utility cover adjustment, traffic loop replacement, and striping.
During construction, OE provided construction management services for the duration of the project, which included thorough and detailed file management due to the federally funded nature of the project. Furthermore, OE provided utility research and coordination with the agencies involved. •Reference: Lauren Sablan, Principal Engineer, (310) 318-0661, [email protected], 20500 Madrona Avenue, Torrance, CA 90503
•Date of the project: 01/2014-04/2015 •Status of the project: Completed •Cost: $600,000 (FEDERAL FUNDED) pico rivera telegraPh roaD meDian imProvements & rehabilitation Majdi Ataya Muhammad Ludy Smeets
P roject
team
OE provided Construction Management & Inspection Services to the City of Pico Rivera on the Telegraph Road Landscape Median Improvements Project. The project limits were on Telegraph Road, between Rosemead Boulevard and Passons Boulevard and on Rosemead Boulevard between Telegraph Road and Vista Del Rosa. This high profile project was funded by the Federal Highway Safety Improvement Program (HSIP) and Proposition C. A portion of the project limits were in the City of Downey, and multi-agency coordination was essential for the successful completion of the project. Telegraph Road is a major residential and commercial thoroughfare running east-west. The roadway rehabilitation comprised of reconstruction of heavily deteriorated areas, including the Telegraph Road and Lindell Avenue intersection. The work also included a 2.5” grind and ARHM overlay. The project also called for curb and gutter, sidewalk, curb ramps, and landscape median improvements. The landscape component entailed fine grading, automatic irrigation installation, constructing a moisture barrier, and placement of over 16,000 tons of mulch, nearly 2,000 shrubs, 85 trees, and 50 brown trunk palms. This project was hailed as a landmark project for the City, and a ribbon cutting ceremony was held to celebrate the completion of work. •Reference: Jose Loera,Associate Engineer, (562) 801-4350, [email protected], 6615 Passons Blvd., Pico Rivera, CA 90660 •Date of the project: 03/2013-09/2013 •Status of the project: Completed •Cost: $2.1 million (FEDERAL FUNDED) SECTION 6.1.1.3: Project Experience & References
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 42 -165-
montebello arroyo Drive imProvement Project
Majdi Ataya Muhammad Ludy Smeets J. Zamarippa
P roject
team
OE provided turnkey construction management and inspection services to the City of Montebello. The project limits are on Arroyo Drive from Astra Drive to Glen Avenue. This project includes pavement rehabilitation (2”-3” grind and overlay), ADA ramp, curb and gutter, and driveway repairs, storm drain improvements, and associated improvements.
The budget for this project is $1,239,085 made up of STPL Funds ($1,063,000) Measure R ($146,045) and Prop C ($30,040) funds, and full compliance with all applicable requirements was essential. The project limits on the north side are adjacent to the back-lot of St. Joseph’s Salesian Youth Retreat Center and Don Bosco Technical Institute.
Coordination for parking access was vital. The Astra Drive neighborhood (cul-de-sac) and Potrero Heights Park and Community & Senior Center at the west end of the project limits also required coordination, since the parking lot and residential neighborhoods can only be accessed from Arroyo Drive.
REFERENCE: Albert Mendoza, PE, Deputy Director of Public Works, 323-887-1200 x469, [email protected], 1600 W Beverly Boulevard, Montebello, CA. 90640
•Date of the project: 2021 •Status of the project: Completed •Cost: $40,000 norwalk Phase 3 local streets rehabIlItatIon (zone 24, 27 & 32) Majdi Ataya Ludy Smeets J. Zamarippa
P roject
team
OE provided CM and Inspection services to the City of Norwalk on the 3rd Stage of Construction of the Local Streets Rehabilitation Paving Improvements. The work included three separate City projects (No. 7924-Zone 24. No. 7925- Zone 25, and No. 7926-Zone 32). Stage 1 of this project included concrete improvements, and OE provided CM and Inspection services for Zone 32 of that phase. Stage 3 included a variety of pavement rehabilitation methods including full-depth repair, grind and overlay, and slurry seal for Zones 24, 27, and 32. Twenty-one streets with a total of 3.6 centerline miles were included as part of this project. These limits were within the two blocks of Highdale Street between Elaine Avenue and Ibex Avenue which had a PCI rated less than 25 (very poor). The streets were also adjacent to Edmondson Elementary School, requiring careful coordination with the school. The replacement of the deteriorated pavement and accessibility ramps was important to improving the safety of the school zone and extending the useful life of the streets. The rehabilitation work involved street repaving which included curb and gutter repairs, slotted cross gutter replacements and pedestrian accessibility ramps at intersection corners to meet current standards.
•Reference: Raymond Velasco, Principal Civil Engineer, (562)-929-5723 [email protected], 12700 Norwalk Boulevard, Norwalk, CA 90650
•Date of the project: 2021 •Status of the project: Completed •Cost: $64,216 montebello varIous streets ImProvement, Fy 2020-21 (cIP no. 881) Majdi Ataya J. Zamarippa
P roject
team
OE provided construction inspection services to the City of Montebello on this project. There are five street segments included in this project. These five segments are (1) Minson Way, from Sycamore Street to the Cul-Du- Sac; (2) Allston Street, from W. City Limit to W. Olympic Boulevard; (3) Medford Street, from Allston Street to 18th Street; (4) Millis Street, from Kensington Way to Medford Street; and (5) Kensington Way, from Olympic Boulevard to Allston Street. The work included variable grind and ARHM overlay, full reconstruction for heavily deteriorated areas, construction of a concrete alley intersection, and PCC improvements covering cross gutters, sidewalk, curb and gutter, driveway approaches, curb ramps, and brick pavers. •Reference: Albert Mendoza, PE, Director, 323-887-1200 x469, [email protected] 1600 W Beverly Boulevard, Montebello, CA. 90640
•Date of the project: 2022 •Status of the project: Completed •Cost: $780,000 SECTION 6.1.1.3: Project Experience & References
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 43 -166-
©®
la mirada alonDra blvD. traFFIc sIgnal/roaDway ImProvement Majdi Ataya Muhammad Mike Nguyen J. Zamarippa
Project
team
OE provided inspection services to the City of La Mirada on this project which covered nearly 1.75 miles of roadway on Alondra Boulevard between Valley View Drive and Mottley Drive. This section of roadway alternates between a 4-lane and 6-lane minor arterial with dedicated left-turn lanes and a center median which alternates between hardscaped median, painted median, and dual-left turn lane. The roadway is located primarily within a residential zone east of Stage Road and a commercial zone to the west. Cerritos College was also located within the project limits. Two railroad crossings intersect the roadway and are located west of Heron Avenue and Phoebe Avenue, respectively. The railroad nearest to Heron Avenue did not appear to be operational. Alondra Boulevard is also utilized by the Orange County Transportation Authority, operating Bus Route 460, with bus stops located along both sides of the roadway.
The work entailed traffic signal installations and upgrades, AC pavement reconstruction, cold milling, asphalt rubber hot mix overlay, Type 2 slurry seal, removal and replacement of damaged curb, gutter, cross gutter, sidewalk and curb ramps. Construction also included adjustment of manholes and water valves, traffic signing, striping, markings, and raised pavement markers.
Eric Villagracia, Project Manager, (562) 902-2373, [email protected] 15515 Phoebe Avenue, La Mirada, CA. 90638 •Date of the project: 2021 •Status of the project: Completed •Cost: $119,000 norwalk local resiDential streets rehabilitation, zone 19, Phase II Majdi Ataya Chino Ludy Smeets Mike Nguyen Muhammad Kevin Green P roject
team
OE provided design engineering and construction management services on phase 2 for the City of Norwalk’s Local Residential Streets Rehabilitation, Zone 19 Project. The pavement management zone limits were bound by Stranstead Avenue to the west, Priscila Street to the north, Shoemaker Avenue to the east, and Rosecrans Avenue to the south, containing approximately 37,500 linear feet (7.1 miles) of local road surface that was slated for rehabilitation. The project was split into two phases: Phase A for concrete work, and Phase B for asphalt work, with the objective of improving the PCI for residential streets, extending the useful roadway life to at least 20 years, improving drainage, upgrading to safer and easier ride quality streets with greater pedestrian access, minimizing future maintenance costs and enhancing aesthetics. The scope called for the development of PS&E to include a total of 94 ADA curb ramps and 8 slotted cross gutters, along with driveway apron construction, utility appurtenance adjustments and relocation, and signing and striping replacement. Also for this project, OE utilized its state-of-the-art high-speed 3D point cloud laser scanner to conduct surveys of approximately 60 existing centerline monuments for preservation. •Reference : Raymond Velasco, Principal Civil Engineer, (562)-929-5723, [email protected] 12700 Norwalk Boulevard, Norwalk, CA 90650
•Date of the project:2022 •Status of the project: Completed •Cost: $206,945 redondo beacH inglewooD avenue & Flagler lane resurFacing Project Majdi Ataya Muhammad Ludy Smeets Tim Stanley
P roject
team
OE provided Construction Inspection services to the City of Redondo Beach on the Inglewood Avenue and Flagler Lane Resurfacing Projects. The project limits are on Inglewood Avenue between Grant Avenue and 190th Street (3,800 linear feet) and on Flagler Lane from 190th Street to Beryl Street (1,060 linear feet) adjacent to the Dominguez Park and Redondo Beach Dog Park. The project includes asphalt and concrete removals, street resurfacing, driveway and alley approaches, cross gutter and spandrel construction, ADA curb ramp construction, utility adjustment, cross gutter replacement, slot paving, signing and striping, tree removal and installation, seal coating, traffic loop detector installation, and other items per plans and specifications. •Reference: Daniel Gruezo, Civil Engineer, (310) 318-0661 x2279, [email protected] 415 Diamond Street, Redondo Beach, CA 90277
•Date of the project: 2019 •Status of the project: Completed •Cost: $288,000 SECTION 6.1.1.3: Project Experience & References
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 44 -167-
©®®®©®
HermoSa beacH street ImProvements at varIous locatIons (cIP 186 & 190) Majdi Ataya Muhammad Ludy Smeets Tim Stanley
P roject
team
OE provided Construction Management and Inspection services for Street Improvements at Various Locations through out the City of Hermosa Beach. The purpose of the project was to restore the surface integrity of the streets, improve the ride quality and safety, as well as mitigate any potential hazards by means of pavement resurfacing. The project included 5,135 feet of full depth street repairs, 3,186 tons of grind and overlay rehabilitation, and 38 ADA Ramp upgrades, along with various sidewalk repairs. OE also provided the City with community coordination by means of establishing public accessable online web maps to inform and update the public on the project, as well a the distribution of public notifications. •Reference: Romany Basilyous, Associate Engineer, 310.318.0263, [email protected] 1315 Valley Drive, Hermosa Beach, CA 90254
•Date of the project: 07/2021 - 09/2021 •Status of the project: Completed •Cost: $200,000 el monte merceD avenue lInear Park Project (cIP 003)
Majdi Ataya Muhammad Ludy Smeets Tim Stanley
P roject
team
OE provided Construction Management and Inspection services to the City of El Monte on the Merced Avenue Linear Park Project, CIP 003, located on Merced Avenue between Garvey Avenue and Towneway Drive. The improvements consisted of constructing a 1.1-acre linear park within the existing roadway to provide traffic calming through lane reduction, tree planting, seating, picnic areas, play and fitness equipment, sidewalk, planting areas, protective fencing, solar lighting, trash receptacles, bike racks, stormwater retention areas, and all other work as indicated in the construction documents. Replacement of existing 6” and 8” water mainline along the east side of Merced Avenue was also included as part of this project. Additionally, OE provided public outreach support on the project. The Project was funded through the Clean California Grant Funds and Local Funds.. •Reference: Kevin Ko, Project Manager, (626) 580-2250, [email protected] 11333 Valley Boulevard, El Monte, CA 91731 •Date of the project: 01/2023 - 11/2024 •Status of the project: Completed •Cost: $413,115 manHattan beacH cycle 1 water main InFrastructure ImProvement Project Majdi Ataya Muhammad Tim Stanley
P roject
team
OE provided Construction Inspection services to the City of Manhattan Beach on the Cycle 1 Water Infrastructure Improvement Project that included the excavation and installation of over 3200 linear feet of 6-inch and 8-inch Ductile Iron Pipe, water valves, curb to curb pavement rehabilitation, ADA compliant curb ramp replacements, all appurtenant work, and 19 valves at the following 6 locations in the City, with all but Manhattan Beach Blvd. requiring street resurfacing for the entire width of the roadway: 12th Street, from Meadows Avenue to Peck Avenue; 23rd Street, from Redondo Avenue to Herrin Avenue; Manhattan Beach Boulevard, from Pacific Avenue to Sepulveda Boulevard; 17th Street, from Meadows Avenue to Rowell Avenue; 22nd Street, from Redondo Avenue to Herrin Avenue; and Herrin Avenue, from 22nd Street to 23rd Street. The project presented unique challenges in coordinating traffic control, work hours, and minimizing the impact to Meadows Elementary School. Portions with deficient fire flow capacity were selected based on pipe size and locations containing severe operations and maintenance issues in order to resolve fire flow and residual pressure, and to minimize potential for negative impacts to public health, the environment, and the number of residents impacted by main breaks, and allowing for more isolated main shutdown during emergency repairs. This project had a 220 working day schedule. •Reference: Tim Birthisel, PE, Senior Civil Engineer, (310) 802-5368, [email protected], 3621 Bell Avenue, Manhattan Beach, CA. 90266
•Date of the project: 2021 •Status of the project: Completed •Cost: $74,000 SECTION 6.1.1.3: Project Experience & References
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 45 -168-
® ® @
©
® ® @
©
brea steel Drive & Pleasant hills water imProvements
Majdi Ataya Muhammad Ludy Smeets
P roject
team
OE provided full construction management and inspection services to the City of Brea on the Steele Drive and Pleasant Hills Water Improvements Project. The project limits were on residential streets within the Steele Drive and Pleasant Hills tracts. The scope of construction entailed replacing approximately 11,840 linear feet of existing water mains with PVC C900 and rehabilitation of the street. The Project also included the removal and replacement of existing damaged sidewalk, concrete curb and gutter, curb ramps and AC pavement, along with the adjustment of existing utilities facilities to grade, construction survey, survey monument restoration, traffic signage and striping, temporary traffic control, and other miscellaneous improvements. •Reference: Raymond Contreras, Project Manager, [email protected], (714) 990-7763, 1 Civic and Cultural Center, Brea, CA 92821
•Date of the project: 2021 •Status of the project: Completed •Cost: $74,360 glendora resiDential street ImProvements & water main Installation Project Majdi Ataya Muhammad Chino Mike Nguyen
P roject
team
OE provided Construction Management and Inspection services to the City of Glendora on the Mauna Loa Avenue Water Main Installation and Street Improvements Project. This project consisted of installing 6,400 LF of new 8-in. water main and 194,000 SF of street improvements that included pavement rehabilitation of grind and overlay, concrete sidewalk repairs, curb and gutter repairs, repairing 11 ADA non-compliant curb ramps, traffic signal loop replacement, signing, and striping for a total of 100 working days. The project was located along 3 streets off Glendora Avenue-Mauna Loa Avenue, Duell Street, and Linfield Street, as well as Minnesota Avenue. . •Reference: Michael Mai, Associate Civil Engineer, (626) 914-8217, [email protected], 116 E. Foothill Boulevard, Glendora, CA 91741
•Date of the project: 2023 •Status of the project: Completed •Cost: $148,335 rancHo cucamonga uPgraDe leFt turn Phases Flashing yellow arrow signal - 7 locations Majdi Ataya Ludy Smeets Chris Boren
P roject
team
OE provided inspection services for the City of Rancho Cucamonga that entailed removing and replacing the existing left turn signal to flashing yellow arrow at 7 locations (4 on Day Creek Blvd. and 3 on Base Line Rd.) as well as modifying existing medians at Base Line and Spruce (westbound left), Day Creek and Victoria Park (northbound and southbound left), and Day Creek and Silverberry (northbound and southbound left). The median modifications include 4’ shifts to increase and improve sight distance. This project also included replacing the controller, and minor paving and striping.
•Reference: Romeo David, PE, Civil Engineer, [email protected], (909) 477-2740 x4070, 10500 Civic Center Dr., Rancho Cucamonga, CA 91729
•Date of the project: 2021 •Status of the project: Completed •Cost: n/a SECTION 6.1.1.3: Project Experience & References
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 46 -169-
® @
©
® @
©
® ® ©
PhasE 1 pre-conStruction
project fileS
Available to the City Project Manager via
either City CMIS, or OE’s ENTERPRISE
• DCRs & RFIs
• Correspondence/Submittals
• CCOs & Progress Reports
• Lab & Field Test Reports
• Materials Delivery Tickets
• Compliance Certification
• Progress Reports & Photos
• Meeting Minutes
• Guarantees & Certifications
job control documentS
• Project Schedule & Bid Schedule
• Bi-Montly Status Reports
• Weekly Statement of Working Days
• Construction Change Orders
• Monthly Construction Payments
• Certified Payroll Records
• Labor Compliance Documents
PhasE 3 poSt-conStructionPhasE 2 conStruction
constructability review
Review/Recommendations • Comments in
Writing • Meeting with DE & PM
rFi coorDination
RFI Response Log
biD awarD suPPort
Bid Analysis
meetings
Meeting Minutes • Meeting Agenda • Look-
Ahead Schedule Review
submittal review
Submittal Log • Stamped Submittals
• Recommendations
Final walk-through/insPection
Certify Completion Recommendations
as-built Plans
IOR Red-Lines • Contractor Red-Lines • CM
Coordinated Records • Final As-Built Documentation
Punch lists
Preliminary Punch List • Final Punch List
non-comPliance items
Non-Compliance Notes
comPletion recommenDations
Completion Recommendations
• Final Report of Completion
Final Payment requests
Final Payment Recommendations • CM Payroll Review
Notes • Employee Interview Forms
• Employee Interview Reports
construction Documentation
Final Project Files (per LAPM) • Final Project Report
• As-Built Drawings • Digital Set of Drawings •
Construction Files
state auDiting
Books • Records • Documents of Audits
• Examinations • Excerpts • Transactions
• Claims Analysis • Litigation (3 year retainment)
submit Project Files
Project summary
Overview of Completed Work • Photos
• Upcoming Work • Closures & Restrictions
scheDule revIew & trackIng
Construction Schedule Updates
PublIc outreach
Mailer Resident Notifications • Community
Coordination Files • Discussion Notes & Dates
• Web Page Updates/Changes
constructIon InsPectIon
Review & File Daily Reports • Weekly Working Day
• Statement Reports • Daily Photo Diary
raw image files & video (digital)
traFFIc control
Traffic Control Notes • Signing
& Striping Inspection • Traffic
Control Plans Review
job saFety comPlIance
Safety Infraction Reports
change orDers
Change Order Notes • Change Order
Recommendations • Verify Accurate Records/
Quantities • Verify Records Back-Up
labor comPlIance
Contractor Certified Payroll Records • CM Payroll
Review Notes • Employee Interview Forms
• Employee Interview Reports
geotechnIcal InvestIgatIon
& materIals testIng
Testing Reports & Tracking Log • Review Comments
& Recommendations
water qualIty swPPP & bmP’s
Weekly Work Reports
constructIon DocumentatIon
see job control documents & project files
survey monuments
Manage/Track/Report Survey
Monument Documentation
cm & InSpectIon Scope of work
SECTION 6.1.1.4: Methodology
metHodology6.1.1.46.1.1.4
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 47 -170-
i . ‘ 3::6
ENGINEERING
design smarter. build better.
.fiml finial. . ,E.,_;I, .mlgfinl m l l \7 m ; L m E (9% |
P u b l i c out
r
e
a
c
h
Scan QR Code
public outreacH
At OE, we believe that effective public outreach is at the heart of every successful capital improvement project.
It’s not just about construction; it’s about people and communities. We know that keeping everyone informed, engaged, and supportive makes a world of difference. Minimizing disruptions, gaining public support, and maintaining a positive image throughout the project are crucial. That’s why we place a strong emphasis on public outreach. By sharing project information with those affected, we build trust and open lines of communication. This approach leads to fewer complaints, safer work environments, and a smoother construction process. We understand the value of making the community feel involved and respected. Through proactive outreach, we turn potential challenges into opportunities for collaboration and understanding. It’s about fostering a positive experience for everyone involved and bringing the human element of our projects to life.
PubliC notiCEs
At OE, we take pride in crafting and designing public notices (PDFs) with essential project information and updates for affected stakeholders. We handle this task on behalf of the City, ensuring that the community remains informed.
Contractors’ notices are often bland and hard to read or understand. In contrast, our notices are crafted to be clear, engaging, and informative, making sure affected stakeholders are aware of all the project details. These notices provide accessible information, helping residents stay informed about any driving or parking restrictions and other important updates. By making the community excited about the project’s outcomes, we foster a sense of involvement and cooperation, making the construction process smoother for everyone.
The purpose of this project is to rehabilitate the distressed asphalt pavement and concrete throughout the project limits. In
doing so, we hope to improve neighborhood connectivity and livability; and to enhance the comfort, safety and aesthetics of the residents and business owners throughout the neighborhood.
The project may require a temporary closure of certain sections of the street and limited access during construction hours.
Zone 3...............................Summer 2023
Lower Azusa Road............Spring 2024
Arden Drive.......................Spring 2024
ROADWAY REHABILITATION
and PARKWAY IMPROVEMENTS
4,000
Square Feet
SIDEWALK
43 Count
CURB RAMPS
3,000
Linear Feet
CURB/GUTTER
and SIGNING and STRIPING UPGRADES.
PURPOSEPURPOSE
SCHEDULESCHEDULE
SITE AREASSITE AREASN
W Hondo Pkwy.W Hondo Pkwy.
Santa Anita Ave.Santa Anita Ave.
Whitmore St.Whitmore St.
Chico Ave.Chico Ave.
Marybeth Ave.Marybeth Ave.
Brockway Pl.Brockway Pl.
N
N
Venita St.Venita St.
Gidley St.Gidley St.
Bisby St.Bisby St.
Frankmont S
t
.
Frankmont S
t
.
Glenfair St.Glenfair St.
Marsen St.Marsen St.
Elmcrest St.Elmcrest St.
Fieldcrest St
.
Fieldcrest St
.
Haverly St.Haverly St.
Emery St.Emery St.
Ar
d
e
n
D
r
.
Ar
d
e
n
D
r
.
Em
e
r
y
S
t
.
Em
e
r
y
S
t
.
Ha
l
i
f
a
x
R
d
.
Ha
l
i
f
a
x
R
d
.
Ra
n
g
e
r
A
v
e
.
Ra
n
g
e
r
A
v
e
.
Wh
i
t
n
e
y
D
r
.
Wh
i
t
n
e
y
D
r
.
S
h
a
s
t
a
P
l
.
S
h
a
s
t
a
P
l
.
Es
t
o
A
v
e
.
Es
t
o
A
v
e
.
Muhall St.Muhall St.
Ranchito St.Ranchito St.
E
l
M
o
n
t
e
A
v
e
.
E
l
M
o
n
t
e
A
v
e
.
Do
r
e
e
n
A
v
e
.
Do
r
e
e
n
A
v
e
.
Hickson St.Hickson St.
Dido St.Dido St.
N
L
o
w
e
r
A
z
u
s
a
R
d
.
L
o
w
e
r
A
z
u
s
a
R
d
.
Peck Rd.Peck Rd.
Durfee Av
e
.
Durfee Av
e
.
El Monte El Monte
Ave.Ave.
Santa Santa Anita Anita Ave.Ave.
N
Ar
d
e
n
D
r
.
Ar
d
e
n
D
r
.
Valley Blvd.Valley Blvd.
Lower
A
z
u
s
a
R
d
.
Lower
A
z
u
s
a
R
d
.
A
r
d
e
n
W
a
y
A
r
d
e
n
W
a
y
MEETING
TO DISCUSS
UPCOMINGZONE 3
CONSTRUCTION
PUBLICNOTICE
The City of El Monte would like to invite
residents and property owners in the vicinity of the upcoming construction project in the Zone 3 residential neighborhood to attend a virtual public meeting. The purpose of the meeting is to provide information and gather feedback
regarding the proposed concrete improvements
and pavement rehabilitation project in the Zone
3 residential area. The meeting will be held on Monday, May 10th, 2023, at 7:00 pm, via Microsoft Teams. The City staff and project engineers will be in attendance to present the project details, answer questions and receive comments. The City
of El Monte values your input and feedback on this important project, and we encourage you to attend this meeting to learn more about the project. Your participation is essential so that the project meets the needs and concerns of the community. Please
review the map on the flip side of this brochure to see if your street is included in the limits of this project.
Thank you for your participation and support.
from The City of El Monte
INVITEINVITE
CI
T
Y
A
D
D
R
E
S
S
1Will IWill I Have AccessHave Access to Myto My Driveway?Driveway? Vehicular access to driveways will be maintained except when necessary construction prohibits
such access for reasonable periods with a minimum 48-hour notice. 3What areWhat are
the Workingthe Working
Hours?Hours?
Construction hours are from:
7am to 4:30pm. These hours
are subject to change.
All parking restrictions will be limited to a reasonable period with a 48- hour advance notice. Information on parking and driving restrictions will be updated regularly and is available at:
oe-eng.com/elmontezone3 2Are Are
there anythere any
ParkingParking
or Streetor Street
Limits?Limits?
4Will myWill my
Trash beTrash be
Collected?Collected?
The Contractor will not schedule
any work on local/residential streets
that will prevent trash pickup on the
same day as trash collection.
Q & AQ & A
WHEN
DAY, MONTH,
YEAR, TIME
WHERE
Microsoft Teams
inforMativE WEb PagEs
At Onward Engineering, we design and maintain informative web pages hosted on a separate sub-domain linked directly to the City’s website. This approach allows us to efficiently produce and update all public notices (PDFs), project information, updates, and dynamic maps without burdening City resources. Our web pages feature enhanced public notices prepared for the contractor on behalf of the City. These notices are crafted to be clear, engaging, and easy to understand, ensuring residents are well-informed about the project. The web pages provide a convenient way for residents to access important information, follow driving or parking restrictions, and stay updated on the project’s progress. By making information readily accessible, we help the community stay involved and excited about the project’s outcomes.
SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 48 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 49 -171-
“lb?
wasnwzswom DRIVE NEIGHEORHOOD .5”,m mmwmvmwn-oym -
1. FREQUENTLY
ASKED
QUESTIONS
1. M... (an I pat my me) Mm, mlmdinn? -._. ~—...-_.. ~—.._--._..-_ mu who. 5. «Law _ wk." (on | wk on ”was 4.1,? .___.._.._..-.._.... ~.—...-..._1.-_..._. ~~~.E_-...-.._ . w,“ | hm owe» to my Away? ._— H-H— .n.._._......_._.. . w»... .. I». am»... a I'm pmikl?
. w»... ... u. writing Inn"? _—.—y..m..—.—..~- ~u...a-..—.n..-—— How a, I 9.4 . ma Im in mm cl my haun? mum...— ++co~mlww nio
any cANvaN cu'roFr rm s cm 0255! on no“: cousaTIou
ocmazn 1a. 2017 , acvoazk 20.2017
5;: MAP pan Dun/ms uzsmcnous AND Dzroun nouns
«. 5.. WM mm .m m, ,... m m— .M. W. - x 1 - .n a. m m M “any“ man; a: nun-mm Ixmmmumlmbmmmm
P u b l i c out
r
e
a
c
h
Scan QR Code
tElEPhonE hotlinE
Onward Engineering provides the City with a dedicated telephone hotline for the entire project lifecycle. This hotline allows for easy tracking, generation, and saving of call logs, including caller information, time of call, and voice-mail.
When callers use the hotline, they are greeted by a brief pre-recorded introduction followed by a vocalized menu offering helpful project information such as street closures, parking restrictions, and schedule changes. Callers also have the option to be routed to a specific staff member for more detailed assistance. Our hotline system is customizable and works seamlessly even if different phases of the project are handled by various consultants, as the contact person can be updated as needed. This system reduces headaches for the City and provides peace of mind to the community, ensuring that they can voice their concerns and obtain information with a simple phone call.
DynaMiC MaPs
At OE, we have the tools and expertise to create interactive and dynamic maps that keep the public informed.
Stakeholders can access these maps online to get real-time updates on detours, phasing, temporary parking, street closures, and general project limits. Our Construction Managers communicate changes to the schedule in real-time, allowing us to update the site before the contractor even leaves for the day. We manage and update the site and its content in real-time, in accordance with City requirements. This approach provides the City with convenient, easy- to-access content for oversight and allows for the effective dissemination of valuable information to the community.
Our dynamic maps ensure that everyone stays informed and up-to-date on all aspects of the project.
To view project pages and map, please visit:
www.oe-eng.com/dbarea5
SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 49 -172-
Slurry Seal Map Q
v No Parking or Driving on day of
consilucilon from 7 am to 5 pm. click on
yoursneer name inine legend or click on
662 Vlews
SHARE ED|T
Day 1(RED): Tue. Sept 5 / Day 2(8LUE...
v Q Annlios Pl (Bowcreek mm Pamera)
. weal side 0! Ammo: - From Centerio c...
. Junewood PI (chandelle P! E to End)
12 more
Day 3 (PURPLE): Thuri Sept 7 I Day 4
o Somh Slde Falomlno - 12' from Curb (m ,.
11 more
Day 5: Saturday. September 16. 2017
D Ballena Dr (Golden springs Dr to Palomi,..
0 El Enclno Di (Palomino or no Golden Spll".
O PalomIno Dr (Bellena Dr (0 S E! Encino Dr)
D Cenier Armlios Pl-12’Wide(Panlera So...
. Nomi Slde o! nhcresl - 12' "cm Curb (w
v Q sonih Side Higncresi Dr — 12' from Curb (...
0 Gold Rush Dr (Highcren Dr to Chandelle
0 Center of Tonio Ln - 12' Wide (Golden Sp."
0 Golden Springs North homage road (El E .
o Cenler Gold Rush Dr «12‘Wide(chandell ,
......... .
®
orange veSt application
orange veSt © is a proprietary tool (web application and iOS application) which streamlines and organizes construction documents, built with the inspection team in mind. Orange Vest allows the CM and Inspector to document work in real-time, and to have field quantities, materials, labor, and equipment automatically update Quantity Sheets, Earned Value Charts, Cost Over Time Charts, Quantity Over Time Charts, and Percent Complete Over Time Charts. It also allows the team to proactively monitor bid items that are nearing 75% complete and keep track of any overages.
The orange veSt © application allows users to generate Field Notifications (Incident Reports), manage Punch- Lists, automatically generate Weekly Statement of Working Day reports, manage Potential Change Orders, Unit Price Change Orders, and Contract Change Orders. On the Construction Management side, it allows users to review and approve/reject submittals and respond to RFIs.
The value of this tool is unprecedented. It took our team over 8 years to develop, and it includes input from former County, District, and Public Works Professionals and Supervising Inspectors.
The following showcases further details, features and usages of this tool:
rFI moDule
Requests for information (RFI) –Throughout all phases of a project, questions come up. In the past, the questions would be fragmented across platforms. Some via email, some hard copy, some scanned, some via text, some over the phone. The RFI module allows you to centralize these requests and to respond to them directly. A user can submit an RFI, either as a user of the app or via a public link for each project. They also mark that RFI as Normal, Expedited, or Critical. They can also attach a PDF to that RFI if needed. Once it is submitted, the Construction and Project Manager is notified via email that an RFI has been submitted, they can respond right away, and the response will be sent directly to the original party that submitted the RFI. The system will also prioritize alerts to the PM/CM so that they address expedited and critical RFIs first. Anytime a change is made to an RFI, the program automatically makes a PDF that includes the RFI information, when an answer is added, that PDF is updated to include the answer. The system also auto-generates a PDF log of the RFIs.
SECTION 6.1.1.4: Methodology SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 50 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 51 -173-
RFI Number
0007
¥
RFI Numbe/
LEN/OI ol umpumnce
Novma‘
lll 0/
Imwmnco
Normal
Normal
CMiCa‘
Expedited
ormca/
Dmical
1/25/22
4/6/22
4/27/22
5/6/22
4/27/22
6/16/22
Dne
Suhmlfled
5/5/22
7/20/22
Into Duo
2/5/22
4/20/22
4/29/22
3/23/22
4/29/22
6/20/22
Dlie Du:
5/20/22
7/22/22
smm
TCSI Duo Dam
Tam Llnk
um oipondod tjocl
3/1 5/22
4/6/22
11/27/22
5/6/22
5/13/22
6/14/22
Duslm Tesl
Tes‘ RFI
Quesfion Regarding man Sheet 5
Decoratwe Pavers
Tesx
Tam Overdue Message
Cnpy Submission Form URL Ewart Lug
AWAIYING RESPONSE A
RESPONDED / COMPLETED A
Rm. «1 By
Duslm Golden
Tepwe Tes‘
Majdi Maya
Muhammad Alaya
Apple Store
Muhammad Ateya
Actions
BE
4,
Acuous
submIttal moDule
The Submittal Module allows Contractors to submit documentation for the materials and processes used during construction, and allows the Contractor to send in the PDF (via our app or public link). The Contractor can submit that document as a new submittal or as a follow up to a previous submittal (re-submittal). The PM/CM is then notified of the posting for their review, and can click the stamp icon and mark the PDF up digitally with a full suite of markup tools. When done, the PM/CM selects a status for that Submittal (Approved-No Exceptions Taken, Approved-Make Corrections Noted, Rejected, Rejected-Revise & Resubmit, Rejected-Submit Specified Item). Then a cover page is auto-generated for that marked up document, which includes an entire tracking history for that Submittal as well as a digital stamp with signature. The system also auto-generates a PDF log of Submittals (both pending and reviewed). list oF Features
View project dashboard, prepare comprehensive daily reports, automatically generate weekly statement of working days, view product quantities to approve progress payments, prepare change order leveraged by real team data, access project files, sign and countersign reports, file field notifications and incident reports, submit and review construction submittals, prepare and respond to requests for information, and more.
SECTION 6.1.1.4: Methodology SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 51 -174-
Suhminal Nmnrm 1m. or orlglnul Submlltal nescnpunn
085430 7/11/22 Plan Sheet
Number n1 Pages Speclllcallon Section last Status
Pending Review
Suhmmal Number Date uf
E 1/19/22 T251 Public Link
E 1/19/22 Ten Public Link
1 3/2/22 Test DUbIlSh bug
I 3/10/22 mle
[ 3/1 0/22 mle
I 3/15/22 TITLE
I Wall Il'lQI-II,‘
Add New Projecl
Number ur Pages
I»
(wiry of Orange, §FIVB Parking L01 Asphall Cont/ere Dru: la” Published DCRs
Start Date August 23, 2021 Days Remaining 14
309
Elapsed Ti
Spec cal an
123
Secllcn
Secflon
SECTION
[.251 Slams
Submll Specified Item
3/02/22
Dusm Gordon
Sub/n11 Specmed nem
3/02/22
Counney Mamn
Submil specified llem
3/03/22
Apple store
Rejecled
3/10/22
Duslln Gordon
submit spear/red llern
3/10/22
Dusun Gordan
Make Cunecims Nmed
3/1 6/22
Courtney Manln
Aclimls
(9-;
DASHBOARD
DAILY REPORTS
WSWD
QUANTITIES
Hello Muhammad Ataya, welcome to your project dashboard, Selva Pa mg
To swiich proyects please use the dropdown in the (op righi corner v J I Updated: Monday, 08/23/2021 a
CHANGE ORDERS
PROJECT DOCS
NOTIFICATIONS
PROJECT
USERS
SUPPORT
|.79°/o
mated Earned
Value
1k
$237,641.97
Actual Cost of Work Performed >
$568,603.79
Authorlzed Consiructlon Cost
Active Projects 12
County of Omnge
Avendale 8. Narrow Canyon Grind and Overlay
DashboarD at a glance
The project dashboard gives you a quick look at the project’s progress, so you know at a glance how many days are remaining, whether or not any daily reports are missing or incomplete, how much time has elapsed, the estimated earned value (automatically updated with each published daily report), the weather forecast that includes an hour- by-hour breakdown, and charting tools to dive deeper on the project’s numbers.
Dashboar D : In-De P th
The project dashboard has three charts currently available: cost over time, which can be viewed for the project as a whole, or specifically for up to 3 bid items at a time; the quantity over time chart, showing both the cumulative & the day/week/month totals for the project as a whole or as individual bid items; the percent complete over time chart, which can be viewed for the project or for individual bid items (up to 3 at a time).
SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 52 -175-
Add New Project Hello Muhammad Ataya. welcome to your project dashboard To swuch proiects please use the droprdown in the top right corner ( nuntu of Orange, Selva PEFHHQ Lot Asphalt Concrete Overlay Start Date August 23, 2021 Days Remaining 14 Active
30%
Published DCRs Elapsed Time
i 7/"
Value
Estimated Earned
/,/
Updated: Monday, 08/23/2021 6 I
$237,641.97
Actual Cost of Work Performed >
$568,603.79
Authorized Construction Cost
Active Projects 12
County of Orange
Avendale a Narrow Canyon Grind and Overlay
Add New Project Hello Muhammad Ataya, welcome to your project dashboard, To swuch proiects please use the dropdown in the top right corner Countv of Orange‘ Selva Parking Lot Asphalt Concrete Overlay Co
s
!
Time Time
Active Projects 12
County at Orange
Avendale & Narrow Canyon Grind and Overlay
—
Pe
r
c
e
n
t
a cent Complete Over Time
Time
Daily rePorting
The daily report is the brains of the application. We built our app with the inspector in mind, as the inspector is the eyes and ears of the project. The daily report dashboard gives the inspector his daily information at a glance. The top bar allows the inspector to jump into work performed (to track labor, equipment, and quantities completed), PCO (potential change orders), notes, tickets, punch list, and weekly recap. biD itemization
Adding a bid item is easy, and it takes all the guess work out of it. No more typos or inaccurate bid items. These are pulled directly from the bid sheet which is uploaded to the system as a CSV file (or manually input). Once a bid item is in, you are ready to add labor and equipment hours to it, or to add quantities performed that day.
SECTION 6.1.1.4: Methodology SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 53 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 52 -176-
( mp: mp. WEDl‘JESDA'VQ AUGUST 25. 2021
OVERVIEW
1%
Precipita
3.1 mph
Wind
lion Partly Cloudy
ESE 83.7 | 65.7
Temperature
WORK PERFORMED
militia!"
32%
Cloud Cover
29.90 in
Pressure
RJ Noble Company, Inc.
Pavement
Recycling
m Aciive Today
PHOTOS
H3800
TlCKETS PUNCHLIST WK RECAP
Bld
S1I'
Bld
Item 43:
Remove roadway
uctural
section
Item 11:
l Traffic control
sign
B | : Bld Item 58:
Lilrsiitflncifd Asphalt concrete
mllllng pavement Dig
outs
Bid Item 15: Bld Item 45:
sand bag Root Pruning
< DER FOR WEDNESDAY, AUGUST 25, ’ '1]
OVERVIEW
Bid Item: 43
Remove roadway
structural section
Bid Item: 85
Paving Mat Interlayer
Bid Item: 45
Root Pruning
WORK PERFORMED
Bid Item 55
Limited Cold milling
Bid Item: 102
Remove and Replace
wheel stops
Bld Item‘ 83’
Bid Item: 88
4' striping Chevron
Asphalt concrete
pavement Dig outs
Bid Item 3:
28" cone
Bld Item 2:
Flagperson 2
flagmen 4 weeks
I :lv Pomp
Contractor mobilized into phase I north side.
lnstalled temporary perimeter fencing. Applying
crack seal to phase 1 (north side) of parking lot.
Contractor performing R&Rs and grinding to
transition overlay. Contractor placing Glasspave
25 and paving 2” overlay for north parking lot
and entrance. Contractor striping north parking
lot and entrance.
—
PHOTOS
Eid Itern‘ ‘58
#
Bid Item: 60
Asphalt concrete
pavement Overlay creek Seal 1
, purity DI Orange .7 Selva Parking Lot Asphalt Concre '
TICKETS PUNCHLIST WK RECAP
Bid Item: 70
mm dilllu LabOIEI RJ Noble Company, Inc. 1h am I
Zach Harpold - Laborer RJ Noble Company. Inc. 1h em I
Nate Sparta Laborer RJ Noble Company, Inc. 2h am i
Project classiFications
Once you add a bid item, assigning labor and equipment is a breeze. Just select the classification, and the system will filter only the personnel and equipment that fit that classification. You only need to type out the name and description once, and it is available throughout the project. If you prefer to put the name and description first, you can do that and the system will show you a list of classifications assigned to that person and equipment. notes
Notes are easy to input. They can be formatted & rearranged. You can use voice text to dictate your notes when you are in a rush. Then you can edit those notes later if needed. You can also assign notes specifically to a bid item, or you can type them out as general notes.
SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 53 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 55 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 54 -177-
< in H I on 'rvturlterm AUbLI" T Selva :rlIJrlrigu
Parklng Lot Asphalt Concré ' l w
OVERVIEW WORK PERFORMED PHOTOS TICKETS PUNCHLIST WK RFCL‘IF' w NobIe Company, Inc
Sk L a John Deere 21 0 LE 2n 0
In M er RJ Noble Company. Inc m
Mini Grinder with Operator (rental)
Pavement Recycling Tractors, Rubber Tire, Industrial, Skid Steer w/ loader or dozer 2h 0m Zach Harpold Laborer RJ Noble Company, Inc. 1h om
Personnel
Andy Vlllegas Anibal same
“Add New! RJ Noble Company, RJ Noble Company. ‘ Ins. Inc.
Eric Torres Jose Paleclos
RJ Noble Company, RJ Noble Company. Inc. Inc.
Daniel Hernandez M anuel Serrato r Jlmmy Gonzales
Custom Country Custom Country All American Asphalt
RJ Noble Germany. Inc,
:rrzs mm H "m“ ”W . 7. I . Selva ParkingLotAephaItConcre OVERVIEW WORK PERFORMED r NOTES PHOTOS TICKETS PUNCHLIST WK FEEr‘RP BI!5I::: Ex.x‘E«»
A
Add Note
Did you know? Vou can Drag and Drop notesto reorder them. ‘l
l
l
'
Contractor onsite at 7 am begins R&R of isolated asphalt concrete pavement repair and cold milling around existing C&G on west end. Contractor removing (grinding) 1' slot pave temp AC ramp up to lip of gutter. The temp AC ramp was placed to remove trip hazard of public when parking lots were opened for the weekends.
Kyle Sato (00 Parks Arhorist) onsite at 8:30 am to view roots in pavement dig outs. Arborist gave approval to remove roots from R&R areas.
III
—
Photos management
Photos can be easily snapped from within the app, or uploaded from the photo library. Add photos, caption them, and rearrange to tell a visual story. No more fumbling to format or organize photos. Let ORANGE VEST© do it for you. Also, the system captures as many photos as you take. You can take 30 photos and only include 8 in the daily report, and the 22 that are not included will automatically be saved as separate image files. quantity moDule
The quantity module shows you the quantities for any period of time. You can view the quantities for the “prior period”, “to date:”, or “remaining”. Tapping the bid item provides a drop-down menu showing the breakdown of that bid item.
SECTION 6.1.1.4: Methodology
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 55 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 54 -178-
’7 V 7‘ .‘ . - nge 1 1 76458694444441“: r117 64586944444446 7117 64586944444446 . ~ .
Subcontracmr paiming arrows for parking lot I Subcontractor painting arrows for parking lot ’ Subcontractor painting arrows for parking lot ’ entrance, entrance, entrance.
A r. v.'11y1) < Ell lLlITITIES E‘ID ITEM LIET '5‘ Selva Par 9 Lol Asphall ConCrE T PrevPriced Items 08/23/21 6 08/30/21 a Expon as Report
PRIOR PERIOD THIS PERIOD TO DATE REMAINING
ORIGINAL THIS PERIOD
BID ITEM NUMBER & NAME
PRICE QUANTITY QTY, USED
43 Remove roadway suuctural section $86 45 yd3 411 335.530 95 47 $435315 55 Limited Cold milling 31425 M 2,713 $38,660.25 5,213 874285425 58 Asphalt concre‘e pavement Dig ouls $123750 Ion 956 31111066700 97 50 $12,041 25 @9113“ concrete pavement Overlay $90.25 ton 2,348 $211,907.00 1,165 3105,1412; 70 Crack Seal $0.66 I! 1,200 $79200 $76560
102 Remove and Replace wheel stops 36365 as 196 812475.40 0 $0.00 TOTAL: 848220231 $226,718.35
cm & inSpection detailed Scope of work
pHaSe 1: pre-conStruction
1 | pre-conStruction meeting
Deliverables: Meeting Agenda • Meeting Minutes
The Construction Manager will arrange and conduct pre-construction meetings and answer questions for the District, additional agency stakeholders, residents and businesses.
The Construction Inspector will attend pre-construction meetings and answer questions as needed. 2 | conStructability review
Deliverables: Plans • Specifications Markup
The CM will review the PS&E to become familiar with the project. The CM will run the initiation of project controls at this phase as well as review and comment on the Contractor’s preliminary schedule, submittals, and notifications to utilities. The CM will arrange and conduct pre-construction meetings and answer questions from the District and businesses. The CM will meet with the inspector to review the contractor’s plans for traffic control, detours, shutdowns and access for emergency vehicles. They will also review of phasing plan/sequence of work.
The Inspector will review the PS&E and become familiar with the Contractor’s preliminary schedule while making suggestions to the CM. The inspector will also attend pre-construction meeting and answer questions as necessary.
Allows our team to convey all project specific information and key items and allows the OE team to gain a clear understanding of the project requirements and District goals.bEnEfIts 3 | rfi coordination
Deliverables: RFI Responses • RFI Log
The CM will review RFI’s, samples, shop drawings, and coordinate with the project designer for interpretation. The CM will also conduct meetings with the Contractor to discuss and resolve any RFIs.
The Inspector will assist with background and clarifications, and provide field data for necessary RFI information.
Quick & accurate responses to Contractor to minimize delays.bEnEfIts detailed Scope of ServiceS6.1.1.56.1.1.5
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 56 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 57 SECTION 6.1.1.5: Detailed Scope of Services SECTION 6.1.1.5: Detailed Scope of Services -179-
4 | Submittal review
Deliverables: Submittal Log • Stamped Submittals • Submittal Recommendations The CM will process and track submittals, shop drawings, change orders, and revisions, and review estimates for reasonableness and cost effectiveness.
The Inspector will provide aid with background, clarifications, and provide field information as necessary.
Checks that all contractor materials and notices comply with PS&E.bEnEfIts 5 | conStruction documentation
Deliverables: Paper & Digital Copies of Construction Documents OE will work with the District to implement a system for organizing, tracking, filing, and managing paper/electronic correspondence including letters, information requests, submittals, contracts, reports, O&M manuals, progress payments, and change orders, etc. The CM will establish job control documents:
DCRs, weekly & bi-weekly status reports, weekly statement of working days, construction change orders, certified payroll records and labor compliance documents. The CM will receive, log, and document monthly construction payments, material receipts, weigh certificates, and material submittals.
The Inspector will coordinate with the CM for all project records, including: DCRs, correspondence, submittals, Contract Change Orders (CCOs), progress payments, Lab and Field Test Reports, Materials Delivery Tickets and Compliance Certification, Progress Reports, Progress Photos, and Meeting Minutes, guarantees, certifications, affidavits, leases, easements, deeds, O&M manuals warranties, and all other necessary documents. This information is made available to the District in real time using our cloud-based system Box Enterprise.
pHaSe 2: conStruction
6 | meetingS
Deliverables: Meeting Agenda - Meeting Minutes - Weekly Statement of Calendar Working Days Report The CM will schedule and conduct weekly progress and dispute resolution meetings as necessary to discuss contract issues, procedures, progress, problems, CCOs, submittals, RFIs, deficiencies and schedules. These meetings will be conducted weekly at the initial stages, and then may transition to biweekly.
The Inspector will attend progress meetings to communicate, coordinate and resolve any issues that may arise at the job site.
Provides open discussion about milestones & issues which are then applied toward verifying District PS&E compliance.bEnEfIts
detailed Scope of ServiceS
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 57 SECTION 6.1.1.5: Detailed Scope of Services SECTION 6.1.1.5: Detailed Scope of Services -180-
mw
@
7 | ScHedule review
Deliverables: Construction Schedule Updates - 4-Week Look-Ahead Sc h
e
d
u
l
e
The CM will review schedule updates. The CM will compare w o
r
k
p
r
o
g
r
e
s
s
w
i
t
h
p
l
a
n
n
e
d
s
c
h
e
d
u
l
e
a
n
d
n
o
t
i
f
y
the Contractor of any slippages and pursue options to get t h
e
C
o
n
t
r
a
c
t
o
r
b
a
c
k
o
n
s
c
h
e
d
u
l
e
.
T
h
e
C
M
w
i
l
l
obtain weekly updates from Contractor that incorporate pro g
r
e
s
s
,
w
e
a
t
h
e
r
d
e
l
a
y
s
,
a
n
d
C
C
O
i
m
p
a
c
t
s
.
T
h
e
CM will assist the District in negotiating time extensions a
n
d
s
u
b
m
i
t
m
o
n
t
h
l
y
p
r
o
g
r
e
s
s
r
e
p
o
r
t
s
t
o
t
h
e
District with a narrative on the progress and complete an E a
r
n
e
d
V
a
l
u
e
A
n
a
l
y
s
i
s
,
a
n
d
r
e
v
i
e
w
a
n
d
v
e
r
i
f
y
quantities of work.
The Inspector will review construction progress schedules re g
u
l
a
r
l
y
,
v
e
r
i
f
y
s
c
h
e
d
u
l
e
s
a
r
e
o
n
t
r
a
c
k
,
i
d
e
n
t
i
f
y
deviations, and ensure corrective actions are taken to bring t h
e
p
r
o
j
e
c
t
b
a
c
k
o
n
s
c
h
e
d
u
l
e
.
Provides a solid baseline schedule for planning and analysis o
f
t
h
e
p
r
o
j
e
c
t
.
bEnEfIts
8 | montHly StatuS reportSDeliverables: Monthly Report
The CM will prepare monthly reports highlighting project prog r
e
s
s
,
C
C
O
’
s
,
c
o
s
t
i
s
s
u
e
s
,
a
n
d
s
c
h
e
d
u
l
e
.
9 | water quality and Swppp
The Inspector shall monitor and enforce the Contractor co m
p
l
i
a
n
c
e
w
i
t
h
W
a
t
e
r
Q
u
a
l
i
t
y
C
o
n
t
r
o
l
P
l
a
n
s
.
The Inspector will also oversee Contractor’s Storm Water Pol l
u
t
i
o
n
P
r
e
v
e
n
t
i
o
n
(
S
W
P
P
P
)
r
e
s
p
o
n
s
i
b
i
l
i
t
i
e
s
.
Clear communication and records to Contractor.
bEnEfIts
10 | community coordination
Deliverables: Community Coordination Records (Includes Business Nam e
,
C
o
n
t
a
c
t
,
P
h
o
n
e
N
u
m
b
e
r
&
A
d
d
r
e
s
s
)
- Discussion Notes, Date & Actions Taken
The CM shall serve as primary contact and authority for thi s
t
a
s
k
.
R
e
s
p
o
n
d
t
o
q
u
e
s
t
i
o
n
s
a
n
d
c
o
n
c
e
r
n
s
o
f
community, and coordinate with the Inspector to ensure proje c
t
n
o
t
i
c
e
s
a
n
d
s
i
g
n
s
a
r
e
u
p
d
a
t
e
d
.
T
h
e
C
M
w
i
l
l
assist the District with coordinating services of other con s
u
l
t
a
n
t
s
a
n
d
r
e
v
i
e
w
P
u
b
l
i
c
N
o
t
i
c
e
s
t
o
e
n
s
u
r
e
accuracy and to avoid business impacts. The CM will noti f
y
t
h
e
D
i
s
t
r
i
c
t
’
s
P
r
o
j
e
c
t
M
a
n
a
g
e
r
w
i
t
h
a
n
y
significant issue, and work with the Inspector to compile a lo g
o
f
a
l
l
q
u
e
r
i
e
s
a
n
d
d
i
s
c
u
s
s
i
o
n
s
w
i
t
h
b
u
s
i
n
e
s
s
community.
The Inspector will work with the Contractor to update signs w
i
t
h
i
n
p
r
o
j
e
c
t
l
i
m
i
t
s
,
a
n
d
c
o
o
r
d
i
n
a
t
e
w
i
t
h
t
h
e
Contractor, safe and acceptable access to adjacent busine s
s
e
s
d
u
r
i
n
g
c
o
n
s
t
r
u
c
t
i
o
n
.
T
h
e
I
n
s
p
e
c
t
o
r
w
i
l
l
coordinate the mitigation of construction impacts with all nec e
s
s
a
r
y
p
a
r
t
i
e
s
,
a
n
d
e
n
s
u
r
e
a
l
l
P
u
b
l
i
c
N
o
t
i
c
e
s
are distributed to each business affected by the project.
RFP for On-Call Construction Management and Inspection Serv i
c
e
s
f
o
r
F
e
d
e
r
a
l
/
S
t
a
t
e
/
Local Funded Public Works Projects for the City of Bellflower 58 SECTION 6.1.1.5: Detailed Scope of Services
-181-
.Mv-x/u
5. .
Minimizes construction impact to residents and businesses.bEnEfIts 11 | conStruction inSpection
Deliverables: Daily Reports - Weekly Statement of Working Days - Daily Photo Diary - Image File - Video File The CM will work closely with the Construction Inspector and review Daily Construction Reports (DCRs) provided by the Inspector.
The Inspector will prepare DCRs and WSWD, monitor compliance with District’s Construction Demolition & Recycling Ordinance, review soil compaction and materials testing certifications of compliance, coordinate with the District regarding quality of work completed, take photos and video prior, during, and after construction and prepare Daily Photo Diaries. The Inspector will prepare field blue-line set of drawings to incorporate Contractor record drawing markups. Lastly, assist in monthly progress payment recommendations by making measurements of bid items.
Checks active jobsite monitoring with documentation and project progress. Also, provides notes on labor, weather, progress, key items, and field observations. Clear documentation of existing condition, progress of construction, and final field conditions. bEnEfIts
12 | traffic control
Deliverables: Traffic Control Notes
The Inspector will coordinate with the CM and will provide inspection of traffic-related work and installations, monitor traffic control to maintain pedestrian and vehicular safety, with minimal disruption, safe access, control of traffic, and provide inspection of all traffic-related work.
Allows us to maintain safe traffic flows during construction.bEnEfIts 13 | job Safety compliance
Deliverables: Safety Infraction Reports
The CM will work with the contractor to implement job safety procedures in compliance with CAL-OSHA requirements, and monitor Contractor’s compliance with established safety protocol.
The Inspector will monitor job safety procedures in compliance with CAL-OSHA requirements, monitor the Contractor’s compliance with established safety program, document deficiencies and hazards, and investigate, report on accidents, observe construction safety, public safety and convenience, and report discovered problems to the District.
Produces a safe and successful construction project from inception to completion.
Also, verify full Federal, State and local safety standard compliance.bEnEfIts
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 59 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 58 SECTION 6.1.1.5: Detailed Scope of ServicesSECTION 6.1.1.5: Detailed Scope of Services ®
@
14 | cHange orderS
Deliverables: Change Order Notes & Recommendations
The CM will establish, implement and coordinate systems for processing all contract change orders; review and evaluate, via an independent cost estimate, cost proposals submitted by the contractor for all contract change orders; negotiate CCO and prepare using District’s standard format and give recommendations; perform quantity and cost analysis for negotiation of CCOs; analyze any additional claims and perform claims administration including monitoring, logging, and tracking claim status; & evaluate cost reduction proposals to provide recommendations to the District.
The Construction Inspector will maintain data for change orders and record information regarding time of dispute, time of notification by contractor.
Provides a clear documentation review and recommendation for change orders to maximize value of contract.bEnEfIts
15 | progreSS paymentS
Deliverables: Verification of Accurately Kept Records of the Quantities Installed - Provide Feedback The CM will track quantities of work completed for progress payment, develop & implement procedures for review & process of progress payment applications, assist the District with review, certification, and process of payments. The CM will keep track of monthly progress and access the contractors’ progress payment applications. If the CM notes any discrepancies, the differences will be negotiated with the contractor before processing payments through the District’s PM.
Provide accurate measurements of work completed by the Contractor.bEnEfIts 16 | labor compliance
Deliverables: Contractor Certified Payroll Pecords)- Construction Manager Payroll Review Notes - Employee Interview Forms & Reports
The CM will monitor compliance with Prevailing Wages and ensure compliance with Federal Labor Laws & the Davis- Bacon Act. The CM will ensure contractors submit certified payroll reports and that labor and hours reported by the Contractor match DCRsl.
The Inspector will conduct field construction employee interviews & verify/document job-site posting of wage rates & labor compliance posters.
Checks for full grant funding compliance.bEnEfIts
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 59 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 61
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 60 SECTION 6.1.1.5: Detailed Scope of Services
-183-
(99 ES (9 CE 0 Q Q
pHaSe 3: poSt-conStruction
17 | fInal walk-tHrougH & InSpectIon
The CM will recommend and conduct a final inspection with the District Staff and project design consultant.
The inspector will conduct final inspections, close-out encroachment & construction permits.
Confirmation to stakeholders of work having been completed.bEnEfIts 18 | aS-built planS
Deliverables: Inspector’s & Contractor’s Red-Lines - Designer Coordination Records - Final As-Built Documentation The CM will maintain as-built work records and activities during construction and will transmit Contractor and IOR red-lines for incorporation into as-built plans, review plans to ensure accuracy and quality, and deliver as-built drawings to District.
The Inspector will review the Contractor’s as-builts daily and verify the Contractor keeps these records up to date throughout construction, and will coordinate the preparation and submittal of as-builts.
Representation and documentation of field changes made during construction along with accurate records.
bEnEfIts
19 | puncH liStS
Deliverables: Preliminary & Final Lists - Inspector’s Non-Compliance Notices & Notes The CM will issue preliminary & final punch lists, and monitor and follow-through with Contractor until completion of punch list items. The CM will review and distribute the Inspector’s notes regarding non-compliant work items and recommend mitigating procedures. The CM will also finalize the bid items, claims, change orders, punch list items, correct shop drawings, and oversee the completion of record drawings.
The Inspector will prepare in-progress punch lists at completion of each project phase until completion.
The Inspector will direct and notify contractors about non-compliance and correct compliance problems as discovered.
Clear communication and records to Contractor. All non-compliant items are noted and fixed prior to notice of completion.bEnEfIts
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 61 RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 60 SECTION 6.1.1.5: Detailed Scope of Services
-184-
pHaSe 3: poSt-conStruction20 | non-compliance itemS
Deliverables: Non-Compliance Notes
The CM will review and distribute the Inspector’s notes regarding non-compliant work items and recommend mitigating procedures for fixing non-compliance. The CM will also finalize the bid items, claims, and change orders.
The Inspector will direct and notify contractors about non-compliance and correct compliance problems as discovered.
21 | completion recommendationS
Deliverables: Completion Recommendations Report - Final Report of Completion The CM will evaluate completion of work and recommend final inspection. This includes preparing the Report of Expenditures Checklist and necessary attachments. The CM will also provide support for construction claims analysis and litigation and will be available for any audits including internal District audits.
The Inspector will provide notes and concurrence to the CM regarding completion of all field work.
Verifies that work items are completed as specified.bEnEfIts 22 | project completion report
Deliverables: Final Progress Payment - Notice of Completion - Final Report The CM will review and process request for final payment and release retention; develop a reasonable cost control system to include regular monitoring of actual costs for activities in progress and estimates for uncompleted tasks and proposed changes and identify variances between costs; file Notice of Completion; prepare final report; review project records.
The Inspector will confirm final field quantities to the CM. The Inspector will provide complete measurements and calculations to administer progress payments and make recommendations for payments.
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 62 SECTION 6.1.1.5: Detailed Scope of Services SECTION 6.1.1.5: Detailed Scope of Services -185-
ma
m
a
mo
®
mo
@
CM & InspeC tion QA/QC
quality assurance anD quality control (qa/qc) For
construction management anD InsPection
Our Construction Managers (CMs) and Inspectors diligently review the contractor’s weekly and daily schedules before work begins each day. We closely coordinate with the contractor to establish a clear understanding of critical activities and the work to be inspected.
We meticulously track submittals, tests performed, samples taken, non-compliance reports, and inspection/ testing associated with non-compliant work through detailed reports.
We provide thorough quality assurance and inspections to ensure that all work meets the required standards and regulations.
We actively monitor the contractor’s Quality Control Program to maintain high standards throughout the project.
With our extensive experience in Construction Management and Inspection, we recognize that a robust QA/QC plan, implemented from the project’s onset, is key to success. At OE, we follow a comprehensive QA/QC manual that clearly defines roles, responsibilities, expectations, review requirements, and quality standards for all documents and procedures within our organization.
Our team’s expertise, honed through numerous public works construction projects in Southern California, helps keep our projects on track.
We understand the importance of comprehending the entire project timeline, from start to finish, and we excel in creating CPM schedules and managing monthly updates with the responsible agencies. goals For Proactively managing Project controls
Equip construction teams with the tools and documents needed to accurately estimate, plan, and monitor work, ensuring alignment with the project’s cost, schedule, quantities, and performance targets.
Identify opportunities and potential risks early to minimize or avoid impacts on cost, schedule, quantities, and performance. Our primary focus is on the early detection of opportunities or risks, followed by the implementation of alternative solutions to quickly address any issues.
Implement control tools and documents to support Change Management processes and the preparation/review of change orders for approval. Our Change Management Control system provides early warning and approval control for deviations in engineering costs, material and equipment costs, and construction activities across all phases.
Enhance communication to give the City long-term visibility, enabling proactive and informed decision-making.
Our Construction Managers will hold regular meetings with the contractor to discuss the schedule’s status and identify potential roadblocks or challenges. They will promptly review each monthly update and provide feedback or acceptance upon receiving the contractor’s submittal. At the start of every project, we tailor the QA/QC program and work plan to meet the project’s specific needs.
Onward Engineering’s approach to project controls involves conscious planning and execution of the work, along with continuous monitoring of cost, schedule, quantities, and performance, to achieve estimating, cost control, and scheduling objectives.
1 2
3 4
1 2
3 4
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 63 SECTION 6.1.1.5: Detailed Scope of Services
-186-
RFP for On-Call Construction Management and Inspection Services for Federal/State/ Local Funded Public Works Projects for the City of Bellflower 64 SECTION 6.1.1.6: Work Hours/Level of Effort Summary & SECTION 6.1.1.7: Project Schedule Task Project Tasks
CONSTRUCTION
MANAGER
hourly
CONSTRUCTION
INSPECTOR
hourly
OFFICE ENGINEER/
PUBLIC OUTREACH
hourly
1 Pre-constructIon
Constructibility Review, RFI Review and Coordination, Bid Analysis, Pre-con meeting, Submittal Review.
80 2 constructIon management & constructIon InsPectIon* (Includes Labor Compliance).
320
3 PublIc outreach & coorDInatIon (oPtIonal)
(Setting up informational website, preparing enhanced public notice, setting up project hotline and automated call log, managing the website with updates, building and updating dynamic map with construction schedule, parking and driving restrictions, and updates).
40 4 Post-constructIon
Final Walkthrough, Punchlist, As-Builts, Completion Recommendation,Final Payment Request, Submit Project Files and Labor Compliance Records. 80 Total 160 320 40
*OE pays all construction inspections prevailing wage in compliance with the requirements of the Department of Industrial Relations (DIR). Hours estimated are based off of a 40 working day schedule per the specs and the City’s RFP.
ONWARD ENGINEERING agrees to full compliance with the RFP schedule and with no changes requested. work HourS/level of effort Summary6.1.1.66.1.1.6
project ScHedule6.1.1.76.1.1.7
-187-