RESOLUTION NO.:-N.S.
CONTRACT: FOTH & VAN DYKE AND ASSOCIATES, INC. FOR ON-CALL
WATERFRONT ENGINEERING, DESIGN, ENVIRONMENTAL PERMITTING AND
CONSTRUCTION ADMINISTRATION SERVICES FOR CAPITAL IMPROVEMENT
PROJECTS
WHEREAS, on June 11, 2025, the City released a Request for Qualifications (Specification No. 25-11753-C) seeking firms or individuals to provide on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects at the Berkeley Waterfront; and WHEREAS, on July 29, 2025, the City received seven submissions, which were reviewed and ranked
by a panel according to the criteria in the Request for Qualifications; and
WHEREAS, based on the results of the rating of the submission, Foth & Van Dyke and Associates, Inc. has been found by has been found to be fully qualified and responsive to the City’s request; and
WHEREAS, funding will be identified and requested for appropriation as projects arise.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager is authorized to approve a contract and any amendments with Foth & Van Dyke and Associates, Inc. for on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects for the contract period of December 1, 2025 through November 30, 2028 in an amount not to exceed $1,000,000. A record signature copy of said contract and any amendments to be on file in the Office of the City Clerk.
RESOLUTION NO.:-N.S.
CONTRACT: GFT INFRASTRUCTURE, INC FOR ON-CALL WATERFRONT
ENGINEERING, DESIGN, ENVIRONMENTAL PERMITTING AND CONSTRUCTION
ADMINISTRATION SERVICES FOR CAPITAL IMPROVEMENT PROJECTS WHEREAS, on June 11, 2025, the City released a Request for Qualifications (Specification No. 25-11753-C) seeking firms or individuals to provide on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects at the Berkeley Waterfront; and WHEREAS, on July 29, 2025, the City received seven submissions, which were reviewed and ranked
by a panel according to the criteria in the Request for Qualifications; and
WHEREAS, based on the results of the rating of the submission, GFT Infrastructure, Inc. has been found by has been found to be fully qualified and responsive to the City’s request; and
WHEREAS, funding will be identified and requested for appropriation as projects arise.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager is authorized to approve a contract and any amendments with GFT Infrastructure, Inc. for on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects for the contract period of December 1, 2025 through November 30, 2028 in an amount not to exceed $1,000,000. A record signature copy of said contract and any amendments to be on file in the Office of the City Clerk.
RESOLUTION NO.:-N.S.
CONTRACT: GHD INC. FOR ON-CALL WATERFRONT ENGINEERING, DESIGN,
ENVIRONMENTAL PERMITTING AND CONSTRUCTION ADMINISTRATION
SERVICES FOR CAPITAL IMPROVEMENT PROJECTS
WHEREAS, on June 11, 2025, the City released a Request for Qualifications (Specification No. 25-11753-C) seeking firms or individuals to provide on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects at the Berkeley Waterfront; and WHEREAS, on July 29, 2025, the City received seven submissions, which were reviewed and ranked
by a panel according to the criteria in the Request for Qualifications; and
WHEREAS, based on the results of the rating of the submission, GHD Inc. has been found by has been found to be fully qualified and responsive to the City’s request; and
WHEREAS, funding will be identified and requested for appropriation as projects arise.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager is authorized to approve a contract and any amendments with GHD Inc., for on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects for the contract period of December 1, 2025 through November 30, 2028 in an amount not to exceed $1,000,000.
A record signature copy of said contract and any amendments to be on file in the Office of the City Clerk.
RESOLUTION NO.:-N.S.
CONTRACT: MOFFATT & NICHOL FOR ON-CALL WATERFRONT ENGINEERING,
DESIGN, ENVIRONMENTAL PERMITTING AND CONSTRUCTION
ADMINISTRATION SERVICES FOR CAPITAL IMPROVEMENT PROJECTS WHEREAS, on June 11, 2025, the City released a Request for Qualifications (Specification No. 25-11753-C) seeking firms or individuals to provide on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects at the Berkeley Waterfront; and WHEREAS, on July 29, 2025, the City received seven submissions, which were reviewed and ranked
by a panel according to the criteria in the Request for Qualifications; and
WHEREAS, based on the results of the rating of the submission, Moffatt & Nichol has been found by has been found to be fully qualified and responsive to the City’s request; and
WHEREAS, funding will be identified and requested for appropriation as projects arise.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager is authorized to approve a contract and any amendments with Moffatt & Nichol for on-call waterfront engineering, design, environmental permitting and construction administration services for capital improvement projects for the contract period of December 1, 2025 through November 30, 2028 in an amount not to exceed $1,000,000. A record signature copy of said contract and any amendments to be on file in the Office of the City Clerk.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Scott Ferris, Director, Parks Recreation & Waterfront Subject: Donation: Memorial Bench at Berkeley Marina in memory of Dove Charlotte Lenz
RECOMMENDATION
Adopt a Resolution accepting a cash donation in the amount of $3,400 for a memorial bench to be placed at Berkeley Marina in memory of Dove Charlotte Lenz.
FISCAL IMPACTS OF RECOMMENDATION
The value of a single bench and memorial plaque is $3,400, which covers the purchasing and installation costs performed by the City. The cash donation will be deposited into Marina Fund donation revenue budget code 608-52-544-591-0000-000- 000-481110 and will be appropriated in FY 2026.
CURRENT SITUATION AND ITS EFFECTS
The family of Dove Charlotte Lenz wishes to donate a memorial bench in their memory to be placed at the Berkeley Marina with a cash donation of $3,400. Per the City’s Park Bench Donation Policy, individuals may donate memorial benches to the City’s parks in selected locations, subject to the approval of the Director of the Parks Recreation & Waterfront Department, and pay for all associated costs, subject to Council disclosure and approval of the gift donation. The Director has determined that the proposed donation complies with the City’s Bench Donation Policy as described in Resolution No. 64,148-N.S. and has approved the donation, subject to Council approval.
BACKGROUND
Benches are placed throughout the City in accordance with the City’s Park Bench Donation Policy approved by Council on July 22, 2008 (Resolution No. 64,148-N.S.).
The City’s Open Governance Ordinance (OGO) requires City Council disclosure and approval of any gift to the City in excess of $1,000 (BMC Section 2.06.150, Ord. 7,166- N.S.)
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACT
The City’s vendor for benches, Dumor, Inc., makes its priority to purchase only sustainably-harvested wood derived from stringently-regulated timber source locations,
13
Donation: Memorial Bench at Cesar Chavez Park CONSENT CALENDAR October 28, 2025
including California, Oregon, Washington and British Columbia. This policy reduces solid waste volumes in landfills, helps conserve natural resources and limits the environmental effects resulting from the extraction of virgin materials. The benches therefore comply with the City’s environmentally preferable purchasing policy, specifically section 3.7 Forest Conservation.
RATIONALE FOR RECOMMENDATION
The City’s Parks Donation Policy provides a mechanism whereby families can donate a memorial bench that both honors a family member and provides the public with a needed amenity.
CONTACT PERSON
Bruce Pratt, Parks Superintendent, 510-981-6700
Alexandra Endress, Waterfront Manager, 510-981-6737
Attachments:
1: Resolution
RESOLUTION NO. -N.S.
DONATION: MEMORIAL BENCH AT THE BERKELEY MARINA IN MEMORY OF
DOVE CHARLOTTE LENZ
WHEREAS, on July 22, 2008, Council adopted the Park Bench Donation Policy (Resolution No. 64,148-N.S.); and
WHEREAS, the City’s Open Governance Ordinance (OGO) requires City Council disclosure and approval of any gift to the City in excess of $1,000 (BMC Section 2.06.150, Ord. 7,166-N.S.); and
WHEREAS, the family of Dove Charlotte Lenz wishes to donate a memorial bench in their memory to be placed at the Berkeley Marina with a cash donation of $3,400; and WHEREAS, per the City’s Park Bench Donation Policy, individuals may donate memorial benches to the City’s parks in selected locations, subject to the approval of the Director of the Parks Recreation & Waterfront Department, and pay for all associated costs, subject to Council disclosure and approval of the gift donation; and WHEREAS, the Director has determined that the proposed donation complies with City’s Bench Donation Policy as described in Resolution No. 64,148-N.S. and has approved the proposed donation; and
WHEREAS, the cash donation will be deposited into Marina Fund donation revenue budget code 608-52-544-591-0000-000-000-481110- and will be appropriated in FY 2026.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that a cash donation in the amount of $3,400 for a memorial bench to be placed at the Berkeley Marina in memory of Dove Charlotte Lenz is hereby accepted.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Scott Ferris, Director, Parks Recreation & Waterfront Subject: Donation: Memorial Bench at Berkeley Rose in memory of Lee and Dorothy Marsh
RECOMMENDATION
Adopt a Resolution accepting a cash donation in the amount of $3,400 for a memorial bench to be placed at Berkeley Rose Garden in memory of Lee and Dorothy Marsh.
FISCAL IMPACTS OF RECOMMENDATION
The value of a single bench and memorial plaque is $3,400, which covers the purchasing and installation costs performed by the City. The cash donation will be deposited into Parks Tax donation revenue budget code 138-52-542-568-0000-000- 000-481110 and will be appropriated in FY 2026.
CURRENT SITUATION AND ITS EFFECTS
The family of Lee and Dorothy Marsh wishes to donate a memorial bench in their memory to be placed at Berkeley Rose Garden with a cash donation of $3,400. Per the City’s Park Bench Donation Policy, individuals may donate memorial benches to the City’s parks in selected locations, subject to the approval of the Director of the Parks Recreation & Waterfront Department, and pay for all associated costs, subject to Council disclosure and approval of the gift donation. The Director has determined that the proposed donation complies with the City’s Bench Donation Policy as described in Resolution No. 64,148-N.S. and has approved the donation, subject to Council approval.
BACKGROUND
Benches are placed throughout the City in accordance with the City’s Park Bench Donation Policy approved by Council on July 22, 2008 (Resolution No. 64,148-N.S.).
The City’s Open Governance Ordinance (OGO) requires City Council disclosure and approval of any gift to the City in excess of $1,000 (BMC Section 2.06.150, Ord. 7,166- N.S.)
14
Donation: Memorial Bench at Cesar Chavez Park – Mullen Family CONSENT CALENDAR October 28, 2025
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACT
The City’s vendor for benches, Dumor, Inc., makes its priority to purchase only sustainably-harvested wood derived from stringently-regulated timber source locations, including California, Oregon, Washington and British Columbia. This policy reduces solid waste volumes in landfills, helps conserve natural resources and limits the environmental effects resulting from the extraction of virgin materials. The benches therefore comply with the City’s environmentally preferable purchasing policy,
specifically section 3.7 Forest Conservation.
RATIONALE FOR RECOMMENDATION
The City’s Parks Donation Policy provides a mechanism whereby families can donate a memorial bench that both honors a family member and provides the public with a needed amenity.
CONTACT PERSON
Bruce Pratt, Parks Superintendent, 510-981-6700
Attachments:
1: Resolution
RESOLUTION NO. -N.S.
DONATION: MEMORIAL BENCH AT BERKELEY ROSE GARDEN IN MEMORY OF
LEE AND DORTHY MARSH
WHEREAS, on July 22, 2008, Council adopted the Park Bench Donation Policy (Resolution No. 64,148-N.S.); and
WHEREAS, the City’s Open Governance Ordinance (OGO) requires City Council disclosure and approval of any gift to the City in excess of $1,000 (BMC Section 2.06.150, Ord. 7,166-N.S.); and
WHEREAS, the family of Lee and Dorothy Marsh wishes to donate a memorial bench in their memory to be placed at Berkeley Rose Garden with a cash donation of $3,400; and WHEREAS, per the City’s Park Bench Donation Policy, individuals may donate memorial benches to the City’s parks in selected locations, subject to the approval of the Director of the Parks Recreation & Waterfront Department, and pay for all associated costs, subject to Council disclosure and approval of the gift donation; and WHEREAS, the Director has determined that the proposed donation complies with City’s Bench Donation Policy as described in Resolution No. 64,148-N.S. and has approved the proposed donation; and
WHEREAS, the cash donation will be deposited into Parks Tax donation revenue budget code 138-52-542-568-0000-000-000-481110- and will be appropriated in FY 2026.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that a cash donation in the amount of $3,400 for a memorial bench to be placed at Berkeley Rose Garden in memory of Lee and Dorothy Marsh is hereby accepted.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Scott Ferris, Director, Parks Recreation & Waterfront Subject: Donation: Memorial Bench at King Park in memory of Leon and Harriett Reiter
RECOMMENDATION
Adopt a Resolution accepting a cash donation in the amount of $3,400 for a memorial bench to be placed at King Park in memory of Leon and Harriett Reiter.
FISCAL IMPACTS OF RECOMMENDATION
The value of a single bench and memorial plaque is $3,400, which covers the purchasing and installation costs performed by the City. The cash donation will be deposited into Parks Tax donation revenue budget code 138-52-542-568-0000-000- 000-481110 and will be appropriated in FY 2026.
CURRENT SITUATION AND ITS EFFECTS
The family of Leon and Harriett Reiter wishes to donate a memorial bench in their memory to be placed at King Park with a cash donation of $3,400. Per the City’s Park Bench Donation Policy, individuals may donate memorial benches to the City’s parks in selected locations, subject to the approval of the Director of the Parks Recreation & Waterfront Department, and pay for all associated costs, subject to Council disclosure and approval of the gift donation. The Director has determined that the proposed donation complies with the City’s Bench Donation Policy as described in Resolution No. 64,148-N.S. and has approved the donation, subject to Council approval.
BACKGROUND
Benches are placed throughout the City in accordance with the City’s Park Bench Donation Policy approved by Council on July 22, 2008 (Resolution No. 64,148-N.S.).
The City’s Open Governance Ordinance (OGO) requires City Council disclosure and approval of any gift to the City in excess of $1,000 (BMC Section 2.06.150, Ord. 7,166- N.S.)
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACT
The City’s vendor for benches, Dumor, Inc., makes its priority to purchase only sustainably-harvested wood derived from stringently-regulated timber source locations,
15
Donation: Memorial Bench at Cesar Chavez Park CONSENT CALENDAR October 28, 2025
including California, Oregon, Washington and British Columbia. This policy reduces solid waste volumes in landfills, helps conserve natural resources and limits the environmental effects resulting from the extraction of virgin materials. The benches therefore comply with the City’s environmentally preferable purchasing policy, specifically section 3.7 Forest Conservation.
RATIONALE FOR RECOMMENDATION
The City’s Parks Donation Policy provides a mechanism whereby families can donate a memorial bench that both honors a family member and provides the public with a needed amenity.
CONTACT PERSON
Bruce Pratt, Parks Superintendent, 510-981-6700
Attachments:
1: Resolution
RESOLUTION NO. -N.S.
DONATION: MEMORIAL BENCH AT KING PARK AT KING PARK IN MEMORY OF
LEON AND HARRIETT REITER
WHEREAS, on July 22, 2008, Council adopted the Park Bench Donation Policy (Resolution No. 64,148-N.S.); and
WHEREAS, the City’s Open Governance Ordinance (OGO) requires City Council disclosure and approval of any gift to the City in excess of $1,000 (BMC Section 2.06.150, Ord. 7,166-N.S.); and
WHEREAS, the family of Leon and Harriett Reiter wishes to donate a memorial bench in their memory to be placed at King Park with a cash donation of $3,400; and WHEREAS, per the City’s Park Bench Donation Policy, individuals may donate memorial benches to the City’s parks in selected locations, subject to the approval of the Director of the Parks Recreation & Waterfront Department, and pay for all associated costs, subject to Council disclosure and approval of the gift donation; and WHEREAS, the Director has determined that the proposed donation complies with City’s Bench Donation Policy as described in Resolution No. 64,148-N.S. and has approved the proposed donation; and
WHEREAS, the cash donation will be deposited into Parks Tax donation revenue budget code 138-52-542-568-0000-000-000-481110- and will be appropriated in FY 2026.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that a cash donation in the amount of $3,400 for a memorial bench to be placed at King Park in memory of Leon and Harriett Reiter is hereby accepted.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Scott Ferris, Director, Parks Recreation & Waterfront Subject: Grant Application – Caltrans Clean CA Program – Community Cleanup and Employment Pathway (CCEP)
RECOMMENDATION
Adopt a Resolution authorizing the City Manager or his designee to submit a grant application to the Clean CA Community Cleanup and Employment Pathway (CCEP) Grant Program; accept any grants; execute any resulting grant agreements and any amendments; and that Council authorize the implementation of the project and appropriation of funding for related expenses, subject to securing the grant.
FINANCIAL IMPLICATIONS
The City will submit a grant proposal in the amount of $200,000 to cover 10-20 youth participant hourly salary costs and program materials. In addition, local match for the grant will be provided in the form of up to 20% of existing FTE staff costs that administer the program. The grant performance period is from April 1, 2026, to April 30, 2027.
CURRENT SITUATION AND ITS EFFECTS
On September 8, 2025, Caltrans announced the Community Cleanup and Employment Pathway (CCEP) Grant funding opportunity with a submittal deadline of November 3, 2025. The CCEP program is a signature initiative under the Clean California Program, administered by the California Department of Transportation (Caltrans). Through competitive grants, the program provides funding to local agencies to conduct targeted litter cleanup and graffiti removal activities, complemented by educational and engagement efforts that foster community pride and long-term maintenance.
The City’s Parks, Recreation, and Waterfront Department (YouthWorks Division) will submit a grant application for up to $200,000 to operate a one-year program that will connect justice-impacted individuals, those experiencing homelessness, at-risk youth, and others with meaningful job training and paid transitional employment opportunities.
Program activities will focus on litter and graffiti abatement, landscaping, and other beautification efforts in highly-impact public spaces in Berkeley, workforce development, equity and inclusion and sustainable community engagement.
16
Grant Application –Clean CA Program (CCEP) CONSENT CALENDAR October 28, 2025
BACKGROUND
The City’s Parks, Recreation, and Waterfront Department provides programming activities for a wide range of youth, young adults, an
d families in the areas of academic
tutoring, pre-school readiness programs for 0-5 and families, and recreation of all types.
Part-time paid internships through YouthWorks offer Berkeley residents valuable work
experience, training, professional development and career growth opportunities.
YouthWorks aligns with the City of Berkeley’s commitment to racial equity, recognizing
systemic barriers and working to expand access to education, employment, and self- sufficiency.
During the school year of 2024-2025, the YouthWorks Division ran a successful program that involved three cohorts of paid interns from Berkeley High School, Berkeley
Technical Academy, and Berkeley City College. Interns engaged in a wide range of staff-led workshops that focused on health education and workforce development.
Interns worked at health-based community organizations and focused on peer-to-peer mentoring as well as community outreach efforts. Each year, the PRW Department
seeks to build on the success of the program and expand the YouthWorks program offerings to reach a larger number of local youth.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The proposed expansion of the City’s outdoor education program will provide larger numbers of underserved resi
dents with outdoor experiences that will enhance their
stewardship of the environment. This program will help the City work on two long-term City of Berkeley Strategic Goals: 4. Champion and demonstrate social and racial equity, and 7. Be a global leader in addressing climate change, advancing
environmental justice, and protecting the environment.
RATIONALE FOR RECOMMENDATION
This program will help the City to support litter abatement and public space beautification efforts while crea
ting workforce development opportunities for individuals facing barriers to employment.
ALTERNATIVE ACTIONS CONSIDERED
None
CONTACT PERSON
Scott Ferris, Director of Parks, Recreation & Waterfront, 981-6703 Rafael Rangell, YouthWorks Manager, PRW, 847-0984.
Attachments
1: Resolution
RESOLUTION NO. ##,###-N.S.
GRANT APPLICATION – CALTRANS CLEAN CA PROGRAM – COMMUNITY
CLEANUP AND EMPLOYMENT PATHWAY (CCEP)
WHEREAS, on September 9, 2025, the Caltrans Clean CA grant program announced a funding opportunity for the Cleanup and Employment Pathway (CCEP) program; and WHEREAS, said procedures established by the Caltrans Clean CA grant program require the Applicant to certify by resolution the approval of the application before submission of said application; and
WHEREAS, successful Applicants will enter into a contract with Caltrans complete the Grant Scope program.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the Council hereby:
APPROVES THE FILING OF AN APPLICATION FOR the Cleanup and Employment Pathway (CCEP) program GRANT FUND; and
1. Certifies that said Applicant has or will have available, prior to commencement of any work on the program(s) included in this application, the sufficient funds to complete the program(s); and
2. Certifies that if the grant is awarded, the Applicant has or will have sufficient funds to operate the program(s) as described in the Grant Selection Criteria response, and
3. Certifies that the Applicant has reviewed, understands, and agrees to the General Provisions contained in the contract shown in the Grant Administration Guide; and
4. Delegates the authority to F. Scott Ferris, Director, Parks Recreation, and Waterfront, to conduct all negotiations, sign and submit all documents, including, but not limited to applications, agreements, amendments, and payment requests, which may be necessary for the completion of the Grant Scope; and
5. Agrees to comply with all applicable federal, state and local laws, ordinances, rules, regulations and guidelines.
6. A record signature copy of said agreements and any amendments to be on file in the Office of the City Clerk.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jordan Klein, Director, Department of Planning and Development Subject: Adoption of Berkeley Building Codes, including Local Amendments to California Building Standards Code
RECOMMENDATION
1. Adopt first reading of an Ordinance repealing and reenacting the Berkeley Building, Residential, Electrical, Mechanical, Plumbing, Energy, and Green Building Standards Codes in BMC Chapters 19.28, 19.29, 19.30, 19.32, 19.34,
19.36 and 19.37, and adopting related procedural and stricter provisions; schedule a Public Hearing, pursuant to state law, for the second reading on November 18, 2025; and
2. Adopt a Resolution setting forth findings of local conditions that justify more stringent regulations than those provided by the 2025 California Building Standards Code, and rescinding Resolution No. 71,320–N.S.
SUMMARY
The purpose of this report is to provide background on the 2025 California Building Standards Code, identify key changes from the 2022 midcycle adoption to 2025 Code editions, and summarize the proposed local amendments which include:
Amendment to the 2025 California Building Code Part 1, to clarify and provide consistency between the codes for fire resistive requirements supporting fire- rated construction.
Adoption of the 2025 California Building Code Part 2 Appendix H Signs, to provide specific code provisions for the installation of signs. Amendment to the 2025 California Electrical Code Part 3, clarifying the separation requirement for conductors of different services, to provide additional safety to service personnel when working on electrical equipment. Retain previously adopted local amendments to the 2022 California Building Code Part 2 with Mid-Cycle Supplement, to retain Berkeley’s more stringent requirements for repairs to existing buildings, technical amendments to structural
17
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
standards, Exterior Elevated Elements (E3) technical amendments, and Emergency Housing, and readopting Appendices I – Patio Covers, J - Grading and Q – Emergency Housing.
Retain previously adopted local amendments to the 2022 California Residential Code Part 2.5 with Mid-Cycle Supplement, to retain Berkeley’s more stringent requirements for technical structural standards, Climatic and Geographic Design Criteria, and readopting Appendices BB - Tiny Houses, BF - Patio Covers, Appendix BI - Light Straw-Clay Construction, Appendix BJ - Strawbale Construction, Appendix BK - Cob Construction (Monolithic Adobe), and Appendix CI Swimming Pool Safety Act.
Retain previously adopted local amendments to the 2022 California Plumbing Code Part 5 with Mid-Cycle Supplement, to require installation of motion activated gas shut-off valves in construction of new buildings, and alterations or additions to existing buildings containing fuel gas piping for which a mechanical or plumbing permit is issued.
Retain previously adopted local amendments to the 2022 California Green Buildings Standards Code (CALGreen) Part 11 with Mid-Cycle Supplement, to retain Berkeley’s more stringent electric vehicle charging requirements in all building types, reduction in cement use, and construction waste management.
The 2022 California Building Standards Code with Mid-Cycle Supplement, with local amendments, is currently adopted in the Berkeley Municipal Code, Title 19 under Ordinance 7,906-N.S., as the Berkeley Building, Residential, Electrical, Mechanical, Plumbing, Energy, Historical, Existing and Green Codes (Berkeley Building Codes).
FISCAL IMPACTS OF RECOMMENDATION
Adoption of the 2025 California Buildings Standards Code, with the proposed local amendments, will have the typical fiscal impacts for staff training, purchase of new code books and reference material, updates to public facing forms and documents, and other administrative tasks.
CURRENT SITUATION AND ITS EFFECTS
As part of a regular three-year cycle, the State Building Standards Commission has published the 2025 California Building Standards Code that must go into effect no later than January 1, 2026. The California Building Standards Code (California Code of Regulations, Title 24) includes the Building Code (Part 2), Residential Code (Part 2.5), Electrical Code (Part 3), Mechanical Code (Part 4), Plumbing Code (Part 5), Energy Code (Part 6), Historical Code (Part 8), Existing Building Code (Part 10), and Green Building Standards Code (Part 11). The Codes provide for minimum uniform standards
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
for health and safety related to the built environment and for their enforcement through a system of permits, plan review, and inspections.
The ordinance proposed for Council adoption, supported by the resolution of findings, provides for the adoption of the referenced California Codes along with certain local amendments, effective January 1, 2026. If this ordinance does not become effective by January 1, 2026, the 2025 California Building Standards Code will automatically become effective on that date, and the City will not be able to maintain or implement the local amendments tailored to Berkeley. The last day to file for a building permit to be reviewed under the current 2022 Codes will be Wednesday, December 31, 2025.
The City’s building-related codes include local amendments reflecting operations and local climatic, geological, and topographical conditions that need to be included as part of the adoption of the new code. Under state law, local jurisdictions may adopt other administrative provisions appropriate to the locality and may adopt stricter code provisions for non-residential construction if justified by findings of local climatic, geological, or topographical conditions. With the passage of AB-130, local jurisdictions may only adopt modifications affecting residential construction if they are substantially similar to previously adopted modifications that were in effect prior to September 30, 2025, with limited exceptions.
Staff are currently working to develop new local reach codes that would establish stricter requirements related to energy efficiency, in order to increase the resilience of new buildings and improve local public health outcomes. Those reach codes are not included in the attached ordinance; staff anticipate advancing those codes for City Council review in early 2026.
This ordinance, with the local amendments, supports the City’s Strategic Plan goals to create a resilient, safe, connected, and prepared city, and to be a global leader in addressing climate change, advancing environmental justice, and protecting the environment. The proposed actions also support emergency housing provisions to assist in the declared homeless shelter crisis.
BACKGROUND
The Council last adopted new California Building Standards Code with local amendments on May 7, 2024, taking effect on July 1, 2024. As with the last code adoption, staff is conducting community outreach to inform future applicants and other community members that all permit applications submitted on or before December 31, 2025, will be reviewed under the currently adopted 2022 building codes. Outreach includes notifications on the City website, announcements on the Permit Service Center website, notification flyers at the Permit Service Center and around 1947 Center Street, and email notifications to local building professionals.
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
When the Department reopens on January 2, 2026, after the New Year’s Day holiday, new permit applications will be reviewed for conformance to the 2025 California Building Standards Code with adopted local amendments.
Berkeley Building Code (Chapter 19.28)
The 2025 Berkeley Building Code adopted in BMC Chapter 19.28 includes numerous model code changes published by the State of California, including reformatting, relocating Wildland Urban Interface (WUI) standards to a separate WUI Code, and changes that impact occupiable roofs, use and occupancies, fire protection features, means of egress, structural modifications, and special inspections, among others.
These changes are designed to enhance protection of public health, safety and general welfare as they relate to the construction and occupancy of buildings and structures.
Previous amendments are retained to the Berkeley Building Code, with administrative provisions to assist in facilitating the City of Berkeley’s Amnesty Program for existing undocumented dwelling units. In addition, Section 113 Board of Appeals in Chapter 1, Scope and Administration, has been renamed Means of Appeal and amended to comply with the California Building Code. The Appeals Board has been changed from the Housing Advisory Commission (HAC) to the City Council. This change is being made due to recent court decisions requiring appeals of Building Code determinations to be heard by the City Council, and also because the HAC members do not necessarily have the technical expertise required by the Building Code.
A new local amendment is being introduced to remove an exception which has created inconsistencies between the California Building Code and the California Residential Code, regarding fire-resistance requirements for structural elements supporting fire- resistive construction. Retention of the exception could allow some buildings to be constructed with a reduced level of fire protection, compromising occupant safety.
Berkeley Residential Code (Chapter 19.29)
The 2025 Berkeley Residential Code adopted in BMC Chapter 19.29 includes numerous model code changes further refining prescriptive provisions for the construction of dwellings and including reformatting, relocating WUI standards to a separate WUI Code, increased seismic restraint requirements for appliances, increasing fire protection features, additional insulation standards, increased smoke alarm requirements, among others. These changes are designed to enhance protection of public health, safety and general welfare as they relate to the construction and use of residential buildings and structures.
Berkeley Electrical Code (Chapter 19.30)
The 2025 Berkeley Electrical Code adopted in BMC Chapter 19.30 is proposed to incorporate a new local amendment clarifying the separation requirement for conductors of different systems, services, or meters. This amendment aims to enhance the safety of occupants, service personnel, and first responders during the utilization, servicing, or
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
operation of these systems, especially considering the aging building stock within the City and the presence of older electrical systems lacking the safety features of modern electrical equipment.
Berkeley Mechanical Code (Chapter 19.32)
The 2025 Berkeley Mechanical Code adopted in BMC Chapter 19.32 incorporates the prior local Berkeley amendment to require installation of residential kitchen range hoods with a minimum air flow of 100 cfm and maximum sound rating not exceeding 3 sones over residential stoves and cooktops. This local amendment is proposed for readoption.
Berkeley Plumbing Code (Chapter 19.34)
The 2022 California Plumbing Code, adopted in BMC Chapter 19.34, incorporates the prior local amendment in response to a referral from the Disaster and Fire Safety Commission, adopted by the City Council on June 1, 2021. This amendment requires mandatory installation of motion activated gas shut-off valves whenever a plumbing or mechanical permit is issued for buildings containing fuel gas piping, regardless of permit valuation. This amendment is intended to reduce or prevent serious gas-related fires or explosions in the event of a major seismic event. This local amendment is proposed for readoption.
Berkeley Energy Code (Chapter 19.36)
The 2025 Berkeley Energy Code adopted in BMC Chapter 19.36 introduces the Long- Term System Cost metric, updated weather data for Berkeley’s climate zone, and higher efficiency requirements for building envelopes. Laboratory spaces are now included, prescriptive baselines favor electric heat pumps, and new requirements cover pipe insulation, lighting controls, and fast-service commercial kitchens with 800-amp electrical service, and is proposed for readoption without local amendments.
No new City amendments were incorporated into the 2025 Berkeley Energy Code.
Berkeley Green Code (Chapter 19.37)
The 2025 California Green Building Standards Code (CALGreen), adopted in BMC Chapter 19.37, introduces more stringent measures for both residential and nonresidential development. Key updates strengthen requirements for EV infrastructure, bicycle parking, and building deconstruction and reuse. Local amendments are also proposed for modification to align with changes in the model code while preserving Berkeley’s previously adopted higher standards for EV charging, low-carbon concrete, and construction and demolition waste diversion. No cost-effectiveness study is required for local amendments to CALGreen.
No new city amendments were incorporated into the 2025 Berkeley Green Code. The existing Berkeley amendments continue to support the 2025 CALGreen requirements for EV charger installations, as recommended in the Berkeley Electric Mobility Roadmap. EV charging infrastructure is a critical component to electric vehicle adoption, and it is significantly more expensive to install as a retrofit than during new construction.
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
Ensuring that newly constructed residential and nonresidential parking has EV charging capability will reduce the long-term costs of EV infrastructure installation, while helping to increase EV adoption, and ultimately help to decrease greenhouse gas emissions associated with transportation.
Berkeley’s Electric Mobility Roadmap emphasizes that being able to charge at home or at work is critical for supporting EV ownership and that, increasingly, daytime charging at work or other nonresidential locations can leverage surplus renewable energy. To get to zero net carbon by 2045, in line with State goals, Berkeley wants at least 610 workplace EV charging stations. Requiring EV charging station installation in new multifamily, nonresidential, and hotel/motel buildings, in concert with EV charging readiness requirements for residential and nonresidential developments, will substantially facilitate electric vehicle adoption in Berkeley.
Previous Local Amendments
Previous local amendments, with some revisions and updates in code language and code sections, are recommended for continuance in the re-enacted Berkeley Building Code (BMC Chapter 19.28). These include:
Article 1. Scope and Administrative Provisions – local amendments concerning permits, applications, fees, undocumented units, appeals, violations, unsafe buildings, and safety assessment placards.
Article 3. Wood Burning Appliances – local amendment reducing the health risks caused by wood smoke based upon Berkeley’s climatic conditions. Article 4. Projection into Public Right of Way – an administrative amendment concerning revocation, removal and indemnification regarding construction in the Right of Way.
Article 5. Existing Buildings – adopting 2025 California Existing Building Code and certain chapters of the 2024 International Existing Building Code to reduce the risk from earthquakes.
Article 6. Repairs to Existing Buildings and Structures – establishing updated regulations for the repairs of damaged structures to comply with the Stafford Act, which authorizes the Federal Emergency Management Agency (FEMA) to fund the repair and restoration of eligible facilities damaged in a declared disaster, and requires that the repair and restoration be "on the basis of the design of such facility as it existed immediately prior to the major disaster and in conformity with current applicable codes, specifications and standards.” Article 7. Amendments to Structural Standards – addressing Berkeley’s close proximity to major earthquake faults. The Tri-chapter Uniform Code Committee (TUCC), which is part of the International Code Council East Bay Chapter, has recommended several structural amendments to previous code editions which
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
are being retained for the 2025 California Building and Residential Codes. Article 8. Construction of Exterior Appurtenances – establishing more stringent construction standards for exterior elevated elements and continuing the amendments adopted in July 2015 following the balcony collapse at 2020 Kittredge Street.
Article 9. Emergency Housing Appendix Q (formally Appendix P) – establishing local amendments reflecting the particular characteristics and needs of Berkeley’s emergency shelter responses.
Previous local amendments that are recommended for continuance in the re-enacted Berkeley Residential Code (BMC Chapter 19.29) include:
Adoption of the California Residential Code Appendices BI (formally Appendix AR) – light straw-clay construction, BJ (formally Appendix AS) - Strawbale Construction, and Appendix BK - Cob Construction in support of sustainable construction practices which reduce environmental impact and provide increased thermal efficiencies.
Adoption of the California Residential Code Appendix BB (formally Appendix AQ) for tiny houses used as dwelling units, relaxing various code requirements as they apply to smaller homes in response to the California housing crisis. Adoption of the California Residential Code Appendix BF - Patio Covers to provide design specifications for patio cover appurtenances. Adoption of the California Residential Code Appendix CI - Swimming Pool Safety Act to provide design specifications for swimming pool safety. Section 19.29.060 Technical Amendments to Structural Standards – addressing Berkeley’s close proximity to major earthquake faults.
Previous local amendments that are recommended for continuance in the re-enacted Berkeley Green Code (BMC Chapter 19.37) include:
Section 19.37.040 Electric vehicle (EV) charging for new construction amendments requiring additional EV infrastructure for new construction projects. Section 19.37.040 Construction and Demolition debris amendments to require that 100% asphalt, concrete, excavated soil and land-clearing debris be diverted from disposal by recycling, reuse, and salvage, in addition to the general 65% diversion requirement.
Section 19.37.040 Low-carbon concrete requirement, which requires that cement used in concrete mix design be reduced by not less than 25 percent.
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
Adoption of the 2025 Berkeley Building Codes with continuing local amendments is important to meeting Berkeley’s Climate Action Plan, Zero Waste, and Fossil Fuel Free Berkeley goals. The Berkeley Green Code, through expanded EV charging and low- carbon concrete requirements, limits the greenhouse gas emissions associated with transportation (currently about 60% of Berkeley’s total emissions) and the use of concrete, a common building product that is responsible for approximately 8% of global carbon emissions. In addition, the increased diversion requirements for construction and demolition materials keeps waste out of landfills. Continued implementation of the Energy Code and Green Code, including the verification of compliance through the building permit and inspection process, results in new buildings operating on cleaner energy, which supports Berkeley’s Climate Action and Fossil Fuel Free City goals.
Therefore, this action is not subject to the California Environmental Quality Act (CEQA), pursuant to CEQA Guidelines Section 15061(b)(3), because it can be seen with certainty that there is no possibility that this action may have a significant effect on the environment. Cal. Code Regs., tit. 14, § 15061(b)(3). Further, the action is exempt from CEQA because it is an action taken by a regulatory agency to protect the environment.
Cal. Code Regs., tit. 14, § 15308.
RATIONALE FOR RECOMMENDATION
State model codes will go into effect on January 1, 2026 without local amendments, unless the City Council adopts or re-adopts such local amendments as proposed in the Ordinance which accompanies this report. Adoption of local amendments and findings will adapt the state codes to better meet the needs of Berkeley’s particular administrative, topographic, geologic and climatic conditions. The purpose of the non- administrative local amendments is to provide a higher level of safety than is reflected in the 2025 codes adopted by the State. The fire and seismic danger and other local conditions, as described in detail in the attached resolution of local conditions, justify Berkeley code amendments that are stricter than the California Building Standards Code.
According to the California Building Standards Commission, the repeal of prior code is often overlooked by municipalities and is critically important to ensure that obsolete provisions are expressly repealed.
ALTERNATIVE ACTIONS CONSIDERED
The City Council could choose to adopt the California Buildings Standards Code with fewer, or no, local amendments; or to take no action and allow the state mandated codes to take effect without local amendments specifically designed for Berkeley.
Adoption of Berkeley Building Codes CONSENT CALENDAR
OCTOBER 28, 2025
CONTACT PERSONS
David Lopez, Chief Building Official, Planning and Development Department, 510-981- 7441
Jeff Jensen, Assistant Building Official, Planning and Development Department, 510- 981-7427
Kurt Hurley, Green Building Program Manager, Planning and Development Department, 510-981-7501
Attachments:
1: Code Adoption Ordinance
2: Resolution Adopting Local Conditions
Attachment 1
ORDINANCE NO. –N.S.
REPEALING AND REENACTING BERKELEY MUNICIPAL CODE CHAPTERS 19.28 (BERKELEY BUILDING CODE), 19.29 (BERKELEY RESIDENTIAL CODE), 19.30 (BERKELEY ELECTRICAL CODE), 19.32 (BERKELEY MECHANICAL CODE), 19.34 (BERKELEY PLUMBING CODE), 19.36 (BERKELEY ENERGY CODE), AND 19.37 (BERKELEY GREEN CODE)
BE IT ORDAINED by the Council of the City of Berkeley as follows:
Section 1. That Berkeley Municipal Code Chapter 19.28 is hereby repealed and reenacted to read as follows:
Chapter 19.28
BERKELEY BUILDING CODE
Sections:
19.28.010 Adoption of the California Building Code
Article 1. Scope and Administrative Provisions
19.28.020 Adoption of Chapter 1 Scope and Administration Article 2. Fire and Smoke Protection Feature Provisions
19.28.030 Technical Amendments to Fire and Smoke Protection Features Article 3. Wood Burning Appliances
19.28.040 Wood Burning Appliances
Article 4. Projection into Public Right of Way
19.28.050 Encroachment into the Public Right of Way - Revocation and Removal Indemnification and Hold Harmless
Article 5. Existing Buildings
19.28.060 Adoption of 2025 California Existing Building Code and certain Chapters of the 2024 International Existing Building Code by Reference
Article 6. Repairs to Existing Buildings and Structures
19.28.070 Adoption of Regulations for the Repairs of Existing Structures Article 7. Amendments to Structural Standards
19.28.080 Technical Amendments to Structural Standards
Article 8. Construction of Exterior Appurtenances
19.28.090 Technical Amendments for Construction of Exterior Projecting
Elements and Appurtenances
Article 9. Emergency Housing
19.28.100 Emergency Housing and Emergency Housing Facilities
19.28.010 Adoption of the California Building Code.
A. The California Building Code, 2025 edition, as adopted in Title 24 Part 2 of the California Code of Regulations, including Appendices H, I, J and Q, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. One copy of this Code is on file in the office of the City Clerk of the City of Berkeley.
B. The California Historical Building Code, 2025 edition, as adopted in Title 24 Part 8 of the California Code of Regulations, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. One copy of this Code is on file in the office of the City Clerk of the City of Berkeley.
C. The California Existing Building Code, 2025 edition, as adopted in Title 24 Part 10 of the California Code of Regulations, including Appendix A, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. One copy of this Code is on file in the office of the City Clerk of the City of Berkeley.
D. This Chapter shall be known as the "Berkeley Building Code" and shall be referred to in this Chapter as "this Code."
E. This Chapter will become effective on January 1, 2026, and shall not apply to any building permit submitted by December 31, 2025.
Article 1. Scope and Administrative Provisions
19.28.020 Adoption of Chapter 1 Scope and Administration Chapter 1 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below.
CHAPTER 1 SCOPE AND ADMINISTRATION
SECTION 101 – GENERAL
101.1 Title. These regulations shall be known as the Berkeley Building Code, hereinafter referred to as “this Code”.
101.4 Referenced codes. The other codes specified in Sections 101.4.1 through 101.4.10, and referenced elsewhere in this Code, shall be considered part of the requirements of this Code to the extent prescribed in each such reference.
101.4.1 Gas. The provisions of the Berkeley Mechanical Code, based on the 2025 California Mechanical Code, and the Berkeley Plumbing Code, based on the 2025 California Plumbing Code, as amended herein, shall apply to the installation of gas piping from the point of delivery, gas appliances and related accessories as covered in this Code. These requirements apply to gas piping systems extending from the point of delivery to the inlet connections of appliances and the installation and operation of residential and commercial gas appliances and related accessories.
101.4.2 Mechanical. The provisions of the Berkeley Mechanical Code, based on the 2025 California Mechanical Code, as amended herein, shall apply to the installation, alterations, repairs and replacement of mechanical systems, including equipment, appliances, fixtures, fittings and/or appurtenances, including ventilating, heating, cooling, air-conditioning and refrigeration systems, incinerators and other energy-related systems.
101.4.3 Plumbing. The provisions of the Berkeley Plumbing Code, based on the 2025 California Plumbing Code, as amended herein, shall apply to the installation, alteration, repair and replacement of plumbing systems, including equipment, appliances, fixtures, fittings and appurtenances, and where connected to a water or sewage system and all aspects of a medical gas system. The provisions of the Berkeley Plumbing Code shall apply to private sewage disposal systems. 101.4.4 Residential property maintenance. The provisions of the Berkeley Housing Code, as adopted in Chapter 19.40, shall apply to existing residential buildings and premises; equipment and facilities; light, ventilation, space heating, sanitation, life and fire safety hazards; responsibilities of owners, operators and occupants; and occupancy of existing premises and structures.
Notwithstanding any provisions contrary in this Chapter, any building or portion thereof constructed in compliance with the Berkeley Building Code shall not be deemed to be in violation of the Housing Code provisions that may conflict. 101.4.5 Fire prevention. The provisions of the Berkeley Fire Code based on the 2025 California Fire Code, as adopted in Chapter 19.48, shall apply to matters affecting or relating to structures, processes and premises from the hazard of fire and explosion arising from the storage, handling or use of structures, materials or devices; from conditions hazardous to life, property or public welfare in the occupancy of structures or premises; and from the construction, extension, repair, alteration or removal of fire suppression and alarm systems or fire hazards in the structure or on the premises from occupancy or operation. 101.4.6 Energy. The provisions of the Berkeley Energy Code, based on the 2025 California Energy Code, as amended herein, shall apply to all matters governing the design and construction of buildings for energy efficiency.
101.4.7 Existing buildings. The provisions of the Berkeley Existing Building Code, based on the 2025 California Existing Building Code, as amended herein, shall apply to matters governing the repair, alteration, change of occupancy, addition to and relocation of existing buildings.
101.4.8 Wildland-Urban Interface. The provisions of the Berkeley Wildland- Urban Interface Code, based on the 2025 California Wildland-Urban Interface Code and adopted in Chapter 19.49, shall apply to building materials, systems and/or assemblies used in the exterior design and construction of new, altered, additions to and demolition of buildings, structures or premises located within a wildland-urban interface (WUI) area.
101.4.9 Electrical. The provisions of the Berkeley Electrical Code, based on the 2025 California Electrical Code, as amended herein, shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances thereto. 101.4.10 Green. The provisions of the Berkeley Green Code, based on the 2025 California Green Building Standards Code, as amended herein, shall apply to enhanced design and construction of buildings through the use building concepts having a reduced negative impact or the positive environmental impact and encouraging sustainable construction practices.
101.5 References to prior codes. Unless superseded and expressly repealed, references in City forms, documents and regulations to the chapters and sections of former Berkeley Building Code editions, shall be construed to apply to the corresponding provisions contained within the 2025 Berkeley Building Code Ordinance No. X,XXX–N.S. and all ordinances amendatory thereof. Any ordinances or parts of ordinances in conflict herewith are hereby superseded and expressly repealed.
SECTION 103 – DIVISION OF BUILDING AND SAFETY
103.1 Creation of enforcement agency. The Division of Building and Safety is hereby created and the official in charge thereof shall be known as the building official. The function of the agency shall be the implementation, administration and enforcement of the provisions of this code.
103.2 Appointment. The building official shall be appointed by the City Manager. 103.3 Deputies. In accordance with the prescribed procedures of the City of Berkeley, the building official shall have the authority to appoint an assistant building official, building inspectors, plans examiners, housing inspectors, permit technicians, and other technical officers and employees. Such employees shall have powers as delegated by the building official.
SECTION 104 – DUTIES AND POWERS OF BUILDING OFFICIAL
104.2.3 Alternative materials, design and methods of construction and equipment.
The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved.
Exception: Reserved
104.7 Official records. The building official shall keep official records as required by Sections 104.7.1 through 104.7.5. Such official records shall be retained for not less than 5 years or for as long as the building or structure to which such records relate remains in existence, unless otherwise required for a longer period by the retention of public record policy of the city.
104.7.1 Approvals. A record of applications received, approved plans, permits and certificates issued shall be maintained by the building official and shall be available for public inspection during business hours in accordance with applicable laws. 104.7.2 Inspections. The building official shall keep a record of each inspection made, including notices of violations issued, notices and orders issued, administrative citation warning letters issued, citations issued and appeals received showing the findings and disposition of each.
104.7.3 Code alternatives and modifications. Application for alternative materials, design and methods of construction and equipment in accordance with Section 104.2.3; modifications in accordance with Section 104.2.4; and documentation of the final decision of the building official for either shall be in writing and shall be retained in the official records.
104.7.4 Tests. The building official shall keep a record of tests conducted to comply with Sections 104.2.2.4 and 104.2.3.5.
104.7.5 Fees. The building official shall keep a record of invoices issued, fees collected and fees refunded in accordance with Section 109.
104.9.1 Materials and equipment reuse. Materials, equipment and devices shall not be reused unless such elements are in good working condition with documentation justifying the condition, labeled and graded as required and expressly approved by the building official.
Add a new Subsection 104.10 to read:
104.10 Unpermitted dwelling units. When a building permit record for a residential unit does not exist, the building official is authorized to make a determination of when the residential unit was constructed and then apply the building standards in effect when the residential unit was determined to be constructed or the current building standards,
whichever is the least restrictive, provided the building or portion thereof does not become or continue to be a substandard or unsafe building. The Building Official is authorized to accept reasonable alternatives to the requirements of the prior or current code editions when dealing with unpermitted dwelling units.
SECTION 105 – PERMITS
105.2 Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following:
Building:
1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar non-occupiable uses, provided that the floor area does not exceed than 120 square feet (11.15 m2), there is an existing primary structure on site and no electrical, plumbing and/or mechanical systems are installed. It is permissible that these structures still be regulated by Section 710A, despite exemption from permit.
2. Fences, other than swimming pool barriers, not over 7 feet (2134 mm) high.
3. Oil derricks.
4. Retaining walls that are not over 4 feet (1219 mm) in height measured from the bottom of the footing to the top of the wall supporting a surcharge or impounding Class I, II or IIIA liquids.
5. Water tanks supported directly on grade if the capacity is not greater than 5,000 gallons (18 925 L) and the ratio of height to diameter or width is not greater than 2:1.
6. Sidewalks and driveways not more than 30 inches (762 mm) above adjacent grade, and not over any basement or story below and are not part of an accessible route.
7. Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work.
8. Temporary motion picture, television and theater stage sets and scenery.
9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches (610 mm) deep, are not greater than 5,000 gallons (18 925 L) and are installed entirely above ground.
10.Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.
11.Swings and other playground equipment accessory to detached one- and two- family dwellings.
12.Window awnings in Group R-3 and U occupancies, supported by an exterior wall that do not project more than 54 inches (1372 mm) from the exterior wall and do not require additional support.
13.Nonfixed and movable fixtures, cases, racks, counters and partitions not over 5 feet 9 inches (1753 mm) in height.
Electrical:
1. Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.
2. Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for a power supply and the installations of towers and antennas.
3. Temporary testing systems: A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.
Gas:
1. Portable heating appliance.
2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.
Mechanical:
1. Portable heating appliance.
2. Portable ventilation equipment.
3. Portable cooling unit.
4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by this code.
5. Replacement of any part that does not alter its approval or make it unsafe.
6. Portable evaporative cooler.
7. Self-contained refrigeration system containing 10 pounds (4.54 kg) or less of refrigerant and actuated by motors of 1 horsepower (0.75 kW) or less.
Plumbing:
1. The stopping of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspection made as provided in this code.
2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of water closets, provided that such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures. 105.3 Application for permit. To obtain a permit, the applicant shall first file an application therefor in writing on a form furnished by the Building and Safety Division for
that purpose. Such application shall not become valid until accepted by the Division as complete and applicable fees paid. Such application shall:
1. Identify and describe the work to be covered by the permit for which application is made.
2. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building and location of work.
3. Indicate the use and occupancy for which the proposed work is intended.
4. Be accompanied by construction documents and other information as required in Section 107.
5. State the valuation of the proposed work as required in Section 109.3.
6. Be signed by the applicant, or the applicant’s authorized agent.
7. Give such other data and information as required by the building official. 105.3.2 Time limitation of application. An application for a permit for any proposed work shall be deemed expired 365 days after the date of filing, or a permit has been issued; except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 180 days per extension. The extension shall be requested in writing and justifiable cause demonstrated on a form furnished by the Building and Safety Division for that purpose. Requests for time extensions shall be accompanied by the payment of a fee set by resolution of the City Council. An application, once abandoned, shall be deemed expired and a new application will be required to be submitted.
Exception. If an application is associated with a code enforcement case, the dates specified in the code enforcement notices take precedence over the timelines specified in this section.
105.5.1 Expiration of Permit. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time for periods not more than 180 days per extension calculated from the date of expiration. The extension shall be requested in writing and justifiable cause demonstrated. (See Health and Safety Code Section 18938.5 and 18938.6.) When a permit is deemed invalid, suspended or abandoned, a new permit is required to complete the work. The new permit application and plans shall be filed describing the remaining work to be completed. Fees shall be assessed based on the valuation of the work remaining to be completed or itemized as allowed by the City of Berkeley fee schedule as adopted. If a site visit or other review is required to determine the extent of the remaining work, a fee may be charged to make such determination.
For the purposes of this section “suspended or abandoned” shall mean that a completed and approved city inspection, per California Building Code Section 110.3, has not been performed for the work approved under the issued permit in the time period the permit is active.
The issuance of a building permit shall not exempt the permittee or any other person from compliance with deadlines imposed in any notice and/or order to correct a code violation issued by the City. If a permit is for a project associated with a code enforcement case, the dates specified in the code enforcement notices take precedence over the timelines specified in this section.
105.8 Permit Conditions. The building official is authorized to stipulate conditions for permits. Permits shall not be issued when public safety would be at risk, as determined by the building official.
SECTION 107—CONSTRUCTION DOCUMENTS
107.5 Retention of construction documents. One set of approved construction documents shall be retained by the building official for a period of not less than 5 years from date of completion of the permitted work, or as required by state or local laws.
SECTION 109 – FEES
109.1 Payment of fees. Except when fees are deferred, a permit application shall not be deemed valid until the fees set forth by resolution of City Council have been paid. Except when fees are deferred, a permit shall not be valid until the fees as set forth by resolution of City Council have been paid, nor shall an amendment to a permit be released until the additional fees, if any, have been paid.
109.2 Schedule of permit fees. On buildings, structures, electrical, gas, mechanical, and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the fee as set forth by resolution of the City Council. Fees for permits and inspections and other related services under this Code shall be assessed and paid as set forth by resolution of the City Council. Unless waived or deferred as provided by local regulations, a plan review fee and other fees as specified in the resolution shall be paid at the time of submitting any documents for review and additional fees as specified in the resolution shall be paid at issuance of the permit. 109.4 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permit shall be subject to a fee as set forth by resolution of the City Council twice the amount and in addition to the permit fees for the portion of the scope of work performed without the permit.
109.7 Re-inspection fees. A re-inspection fee, as set forth by resolution of the City Council, may be assessed for each re-inspection when such portion of work for which an inspection is scheduled is not complete, is required to be reinspected after receiving a
previously approved inspection for the same work, or when corrections previously called for are not made.
This section applies for the following conditions:
1. When the work is not ready for inspection when the inspector arrives at the site.
2. When excessive scheduling of inspections for work not yet completed at the site.
3. When the approved plans, permit and inspection card are not readily available to the inspector at the work site.
4. For failure to provide access on the date for which the inspection is requested.
5. When work deviates from the approved plans and no approved revision to approved plans has been obtained by the permittee.
6. When other reasons, as determined by the building official, requires a re-inspection fee to be assessed.
Re-inspection fees shall not be required each time a job is disapproved for failure to comply with the requirements of this Code.
The applicant shall pay the re-inspection fee as set forth by resolution of the City Council.
In instances where re-inspection fees have been assessed, no additional inspection of the work will be performed until the required fees have been paid.
SECTION 112 – SERVICE UTILITIES
112.1 Authority for Connection of service utilities. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by this code for which a permit is required, until authorization to connect has been obtained from the building official. 112.4 Authority to connect utilities. Clearance for connection of one utility, either gas or electrical, will be withheld until final building, electrical, plumbing, and/or mechanical inspections are made and approval has been given for any new building or change in occupancy classification to an existing building for which connection to such utilities is sought, unless approval has been first obtained from the building official. 112.5 Unsafe utility services. Unsafe utility services are hereby declared to be public nuisances and shall be abated, repaired, rehabilitated, demolished or removed in accordance with the procedures set forth in Chapter 19.40 of the Berkeley Municipal Code (BMC) for residential buildings and Berkeley Building Code for all other buildings, or any alternate procedure that may be adopted by the City of Berkeley. In addition, the City Attorney may pursue other appropriate actions to prevent, restrain, correct or abate the violation as provided for in the BMC. Remedies under this section are cumulative. When utility services are maintained in violation of this Code and in violation of a notice issued pursuant to the provisions of this section, the building official shall institute appropriate action to prevent, restrain, correct or abate the violation.
112.6 Authority to disconnect utilities in emergencies. The building official or building official’s authorized representative shall have the authority to disconnect electrical power or other energy service supplied to the building, structure, system or building service equipment therein regulated by this Code in case of emergency where necessary to eliminate an immediate hazard to life or property or where such utility connection has been made without the approval required by Section 112.1 or 112.2. The building official or building official’s authorized representative shall, whenever possible, notify the serving utility, and the owner of the building, structure or electrical system or equipment and any building occupants of the decision to disconnect prior to taking such action and shall notify them, in writing, of the disconnection as soon as possible thereafter.
112.7 Authority to condemn electrical, plumbing and/or mechanical systems and equipment. Whenever the building official determines that an electrical, plumbing, or mechanical system or equipment regulated by this Code is hazardous to life, health or property, the building official may order in writing that such systems or equipment either be removed or restored to a safe condition. The written notice shall fix a reasonable time limit for compliance with such order. Persons shall not use or maintain defective systems or equipment after receiving such notice except as may be provided therein.
When equipment or an installation is to be disconnected, a written notice of such disconnection and the reasons therefore shall be given within 24-hours of the order to disconnect to the serving utility, the owner and occupants of the building, structure or premises.
When equipment or an installation is maintained in violation of this Code and in violation of a notice issued pursuant to the provisions of this section, the building official shall institute appropriate action to prevent, restrain, correct or abate the violation.
Unsafe electrical, plumbing, and/or mechanical systems or equipment are hereby declared to be public nuisances and shall be abated by repair, rehabilitation, demolition or removal in accordance with the procedures set forth in Chapter 19.40 of the BMC for residential buildings and Berkeley Building Code for all other buildings, or any alternate procedure adopted by the City of Berkeley. In addition, the City Attorney may pursue other appropriate action to prevent, restrain, correct or abate the violation as provided for in the BMC. Remedies under this section are cumulative.
112.8 Connection after order to disconnect. Persons shall not make connections to a service utility, a source of energy, fuel, or power, or a water system or sewer system or equipment that has been disconnected or ordered to be disconnected by the building official, or the use of which has been ordered to be discontinued by the building official, until the building official authorizes the reconnection and use of the disconnected systems or equipment.
SECTION 113 – BOARD OF APPEALS
Section 113 Means of Appeals
113.1 Appeals Procedure. The City Council shall hear and decide on appeals of orders, decisions, or determinations made by the Building Official relative to the application and interpretation of this code. A property owner may appeal an order, decision, or determination of the Building Official within 10 calendar days of the date of mailing of the appealable action. The notice of appeal shall contain a statement of the reasons for the appeal and be filed with the City Clerk of the City of Berkeley. The City Clerk shall forward one copy thereof to the Building Official, who shall transmit to the City Council all their records pertaining to the decision being appealed.
Section 113.1.1 Payment of Fees and Fines. Prior to the deadline to appeal, the property owner must pay the appeal fee, per the adopted fee schedule, in addition to an advance deposit of the fine or file an application for an advanced deposit hardship waiver. If the hardship waiver is not granted, the fine must be deposited to the City within 14 days of mailed notice of that decision. No hearing will be scheduled prior to receipt of payment or approval of the hardship waiver.
Section 113.1.2 Stay of Proceedings. The filing of the notice of appeal shall stay all proceedings by all parties in connection with the matter upon which the appeal is taken until determination of the appeal as hereinafter provided, unless the Building Official determines that such a stay could result in an imminent threat to public safety. 113.2 Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code or the rules legally adopted thereunder have been incorrectly interpreted, the provisions of this code do not fully apply or an equivalent or better form of construction is proposed. The City Council shall not have authority to waive requirements of this code.
113.3 Decisions. The City Council shall review the action of the Building Official and shall do one of the following:
a. Refer the matter back to the Building Official.
b. If the facts stated in or ascertainable from the Notice of Appeal, the written statement of the building official setting forth the reason for their decision, and the other papers, if any, constituting the record do not, in the opinion of the City Council, warrant further hearing, the City Council may affirm the decision of the Building Official. Such decision shall be final.
c. If, in the opinion of the City Council, said facts warrant further hearing, the City Council shall set the matter for hearing and shall give notice of the time and place of said hearing by mailing a copy of such notice by certified mail to the address of the appellant as stated in the Notice of Appeal, at least ten (10) days before the time fixed for the hearing. The City Council may continue the hearing from time to time.
d. Following such hearing, the City Council shall reverse, affirm wholly or partly modify any decision of the Building Official, or make any other decisions or determinations or impose such conditions as the facts warrant. Such decision or determination shall be final.
e. If none of the above actions have been taken by the City Council within thirty (30) days from the date the appeal first appears on the City Council agenda, then the decision of the Building Official shall be deemed affirmed and the appeal shall be deemed dismissed.
f. The appeal is set for hearing but the disposition of the appeal has not been determined within ninety (90) days from the date the appeal first appears on the City Council agenda, then the decision of the Building Official shall be deemed affirmed and the appeal deemed dismissed.
113.4 Administration. The Building Official shall take action without delay in accordance with the decision of the City Council.
SECTION 114 – VIOLATIONS
114.4 Violation penalties. Any person who violates a provision of this code or fails to comply with any of the requirements thereof or who erects, constructs, alters or repairs a building or structure in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provisions of this code, shall be subject to penalties as prescribed by law. Violations of this code are misdemeanors, but may be cited or charged, at the election of the enforcing officer, building official, or City Attorney, as infractions, subject to an election by the defendant under Penal Code Subsection 17(d). Nothing in this Section shall prevent any other remedy afforded by law.
SECTION 116 - UNSAFE STRUCTURES AND EQUIPMENT
116.1 Unsafe conditions. Structures or existing equipment that are or hereafter become structurally or otherwise unsafe, insanitary or deficient because of inadequate means of egress facilities, inadequate light and ventilation, or which constitute a structural or fire hazard, or are otherwise dangerous to human life or the public welfare, or that involve illegal or improper occupancy or inadequate maintenance, shall be deemed an unsafe condition. Unsafe structures shall be taken down and removed or made safe, as the building official deems necessary and as provided for in this section. A vacant structure that is not secured against unauthorized entry shall be deemed unsafe. 116.5.1 Restoration and Abatement process: All such unsafe buildings, equipment, structures or appendages are hereby declared to be public nuisances and shall be abated by repair, rehabilitation, demolition or removal in accordance with the procedures set forth in Chapters 1.24, 19.28, 19.40 and/or 19.44 of the BMC as applicable. As an alternative, the building official, or other employee or official of this jurisdiction as designated by the City Council, may institute any other appropriate action to prevent, restrain, correct or abate the violation.
116.6 Safety Assessment Placards.
116.6.1 Intent. This section establishes standard placards to be used to indicate the condition of a structure for occupancy after a natural or human-caused disaster and a rapid evaluation by authorized personnel. The building official or authorized representatives shall post the appropriate placard at each entry point to a building or structure upon completion of a safety assessment.
116.6.2 Application of provisions. The provisions of this section are applicable to all buildings and structures of all occupancies regulated by the City of Berkeley. The City Council may extend the provisions as necessary.
116.6.3 Definitions.
116.6.3.1 Safety Assessment. Safety Assessment is a visual, non-destructive examination of a building or structure for the purpose of determining the condition for continued occupancy.
116.6.3.2 Placards. Following are titles and descriptions of the official jurisdiction placards to be used to designate the condition of a building structure for continued occupancy, partial or conditional occupancy, or unsafe to enter. Copies of placards are on file in the Building and Safety Division of the Planning and Development Department.
INSPECTED – Lawful Occupancy Permitted is to be posted on any building or structure wherein no apparent hazard has been found. This placard is not intended to mean there is no damage to the building or structure, but that any damage that occurred does not present a hazard to occupants.
RESTRICTED USE is to be posted on each building or structure that has been damaged wherein the damage has resulted in some form of restriction to the continued occupancy.
The individual who posts this placard will note in general terms the type of damage encountered and will clearly and concisely note the restrictions on continued occupancy.
UNSAFE – Do Not Enter or Occupy is to be posted on each building or structure that has been damaged such that continued occupancy poses a threat to life safety. Building or structures posted with this placard shall not be entered under any circumstances except as authorized in writing by the building official, or the building official’s authorized representative. Safety assessment teams shall be authorized to enter these building at any time. This placard is not to be used or considered as a demolition order. The individual who posts this placard will note in general terms the type of damage encountered. 116.6.4 Content of placard. The BMC Section number and the words "City of Berkeley" shall be permanently affixed to each placard.
116.6.5 Unlawful to remove. Once a placard has been attached to a building or structure, it is not to be removed, altered or covered until done so by an authorized representative of the Building Official. It shall be unlawful for any person, firm or corporation to alter, remove, cover or deface a placard unless authorized pursuant to this section.
Article 2. Fire and Smoke Protection Features
19.28.030 Fire and Smoke Protection Features.
Chapter 7 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below.
Section 711 – Floor and Roof Assemblies.
711.2.3 Supporting construction. The supporting construction shall be protected to afford the required fire-resistance rating of the horizontal assembly supported.
Exception: In buildings of Type IIB, IIIB or VB construction, the construction supporting the horizontal assembly is not required to be fire-resistance rated at the following:
1. Horizontal assemblies at the separations of incidental uses as specified by Table 509.1 provided that the required fire- resistance rating does not exceed 1 hour.
2. RESERVED Horizontal assemblies at the separations of dwelling units and sleeping units as required by Section 420.3.
3. Horizontal assemblies at smoke barriers constructed in accordance with Section 709.
Article 3. Wood Burning Appliances
19.28.040 Wood Burning Appliances.
Chapter 31 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below.
Section 3115 - Wood Burning Appliances.
3115.1 Purpose. The purpose of this section is to reduce the health risks caused by wood smoke under the climatic conditions applicable to Berkeley. 3115.2 Definitions. For purposes of this section the following terms shall be defined as set forth below.
1. “EPA” means the United States Environmental Protection Agency.
2. “EPA Certified” means any wood heater that is labeled “EPA Certified” in accordance with the standards in Title 40, Part 60, Subpart AAA, of the Code of Federal Regulations or equivalent, in effect at the time the wood heater is installed.
3. “Pellet heater” means wood heaters that burn pellet fuel exclusively and are either EPA-certified or exempted under EPA requirements set forth in Part 60 Title 40, Subpart AAA, of the Code of Federal Regulations, February 26, 1988.
4. “Wood-burning” means an appliance that burns wood or any wood-based solid fuel, including but not limited to wood pellets.
5. “Wood burning cooking device” means any wood-burning device that is designed or primarily used for cooking.
6. “Wood-burning fireplace” means any permanently-installed masonry or factory- built wood-burning appliance, either open or with doors in front of the combustion chamber, which is neither a wood heater as defined in 40 CFR
60.531 nor designed and used for cooking.
3115.3 Allowable wood-burning fireplace. No wood-burning fireplace or wood heater as defined in 40 CFR 60.531, that is not EPA certified or exempted by under EPA requirements may be installed in any occupancy.
Exception:
1. Existing masonry fireplaces may be repaired in accordance with the applicable codes in effect at the time of the proposed repair or reconstruction. For purposes of this exception, the term repair includes resurfacing the combustion chamber, but does not include replacing any other part of the combustion chamber.
2. Wood burning cooking devices are not prohibited by this section. 3115.4 Documentation. Any person planning to install a wood-burning fireplace or heating stove must submit verifiable documentation to the City showing that the appliance conforms to the requirements of this section.
Article 4. Projection into Public Right of Way
19.28.050 Encroachments into the Public Right of Way – Revocation, Removal, Indemnification and Hold Harmless.
Chapter 32 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below.
SECTION 3202 – ENCROACHMENTS
3202.5 Projection into the Public Right of Way – Revocation, Removal, Indemnification and Hold Harmless.
Any permits granted pursuant to this Code which allow any projection upon, over, or under the public right of way may be revoked by the City at any time. Upon such revocation, the permittee or permittee’s successor(s) or assignee(s) shall forthwith remove such projection at permittee’s cost and expense and without any cost or expense whatsoever to the City.
Any person who is granted a permit pursuant to the provisions of this Code which allows a projection upon, over or under the public right of way shall by the issuance of such permit thereby indemnify and hold harmless the City of Berkeley, its officers and employees of and from any and all liabilities, claims, demands, actions or causes of action for injury or injuries to any person or persons or death or deaths of any person or persons or damage to property arising out of or occasioned in any way by the issuance of said permit, the work performed pursuant to such permit, or the existence of such projection.
The obligation of such indemnification and hold harmless provision shall be applicable to the successor(s) and assignee(s) of the permittee.
Article 5. Existing Buildings
19.28.060 Adoption of 2025 California Existing Building Code and certain Chapters of the 2024 International Existing Building Code by reference. 2025 California Existing Building Code (CEBC), including Appendix A, is adopted in its entirety subject to the modifications thereto which are set forth below.
DIVISION II SCOPE AND ADMINISTRATION
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any CEBC administrative provisions that may conflict.
101.9 Adoption of Certain Chapters of the 2024 International Existing Building Code by reference.
When seismic retrofit is not otherwise required by this Code, the following Chapters of the 2024 International Existing Building Code (IEBC) published by the International Code Council contained in the IEBC Appendix A are hereby adopted by reference as applicable to the types of buildings as designated therein as though fully set forth herein:
Chapter A2, Earthquake Hazard Reduction in Existing Reinforced Concrete and Reinforced Masonry Wall Buildings with Flexible Diaphragms Article 6. Repairs to Existing Buildings and Structures
19.28.070 Adoption of Regulations for the Repairs of Existing Structures.
Add a new Subsection 405.2.7 to Chapter 4 Section 405 of the California Existing Building Code.
405.2.7 Seismic Evaluation and Design Procedures for Repairs. The seismic evaluation and design shall be based on the procedures specified in the California Building Code or ASCE 41 Seismic Evaluation and Retrofit of Existing Buildings. The procedures contained in Appendix A Chapters A1, A3 and A4 of the California Existing Building Code and Appendix A Chapter A2 of the International Existing Building Code shall be permitted to be used as specified in Section 405.2.7.2. 405.2.7.1 Compliance with CBC level seismic forces. Where compliance requires the use of full seismic forces, the criteria shall be in accordance with one of the following:
1. One-hundred percent of the values in the California Building Code. Where the existing seismic force-resisting system is a type that can be designated as “Ordinary,” the values of R, Ωo, and Cd used for analysis in accordance with Chapter 16 of the California Building Code shall be those specified for structural systems classified as “Ordinary” in accordance with Table 12.2-1 of ASCE 7, unless it is demonstrated that the structural system will provide performance equivalent to that of a “Detailed,” “Intermediate” or “Special” system.
2. ASCE 41, using a Tier 3 procedure and the two-level performance objective in Table 405.2.7.1.
Table 405.2.7.1
PERFORMANCE OBJECTIVES FOR USE IN ASCE 41 FOR COMPLIANCE WITH
FULL SEISMIC FORCES
RISK CATEGORY (Based
on CBC Table 1604.5)
STRUCTURAL
PERFORMANCE LEVEL FOR
USE WITH BSE-1N
EARTHQUAKE HAZARD
LEVEL
STRUCTURAL
PERFORMANCE LEVEL
FOR USE WITH
BSE-2N EARTHQUAKE
HAZARD LEVEL
I Life Safety (S-3) Collapse Prevention (CP)
II Life Safety (S-3) Collapse Prevention (CP)
III Damage Control (S-2) Limited Safety (S-4)
IV Immediate Occupancy (S-1) Life Safety (S-3)
405.2.7.2 Compliance with reduced CBC level seismic forces. Where seismic evaluation and design is permitted to meet reduced seismic forces, the criteria used shall be in accordance with one of the following:
1. The California Building Code using 75 percent of the prescribed forces. Values of R, Ωo, and Cd used for analysis shall be as specified in Section 405.2.7.1 Item 1.
2. Structures or portions of structures that comply with the requirements of the applicable chapter in Appendix A of the California Existing Building Code (CEBC) or Appendix A of the International Existing Building Code (IEBC) as specified in Items 2.1 through 2.4 below shall be deemed to comply with this section.
2.1. The seismic evaluation and design of unreinforced masonry bearing wall buildings in Risk Category I or II are permitted to be based on the procedures specified in CEBC Appendix A Chapter A1, provided the design is no less stringent than required in Berkeley Municipal Code Section 19.38.130.
2.2. Seismic evaluation and design of the wall anchorage system in reinforced concrete and reinforced masonry wall buildings with flexible diaphragms in Risk Category I or II are permitted to be based on the procedures specified in IEBC Appendix A Chapter A2.
2.3. Seismic evaluation and design of cripple walls and sill plate anchorage in residential buildings of light-frame wood construction in Risk Category I or II are permitted to be based on the procedures specified in CEBC Appendix A Chapter A3.
2.4. Seismic evaluation and design of soft, weak, or open-front wall conditions in multiunit residential buildings of wood construction in Risk Category I or II are permitted to be based on the procedures specified in CEBC Appendix A Chapter A4.
3. ASCE 41, using the performance objective in Table 405.2.7.2 for the applicable risk category. The design spectral response acceleration parameters Sxs and Sx1 specified in ASCE 41 shall not be taken less than 75 percent of the respective design spectral response acceleration parameters S DS and S D1 defined by the California Building Code and its reference standards.
Table 405.2.7.2
PERFORMANCE OBJECTIVES FOR USE IN ASCE 41 FOR COMPLIANCE WITH
REDUCED SEISMIC FORCES
RISK CATEGORY
(Based on CBC
Table 1604.5)
STRUCTURAL PERFORMANCE
LEVEL FOR USE WITHBSE-1E
EARTHQUAKE HAZARD LEVEL
STRUCTURAL
PERFORMANCE LEVEL FOR
USE WITH BSE-2E
EARTHQUAKE HAZARD
LEVEL
I Life Safety (S-3). See Note a Collapse Prevention (S-5) II Life Safety (S-3). See Note a Collapse Prevention (S-5) III Damage Control (S-2). See Note a Limited Safety (S-4). See Note b IV Immediate Occupancy (S-1) Life Safety (S-3). See Note c
a. For Risk Categories I, II, and III, the Tier 1 and Tier 2 procedures need not be considered for the BSE-1E earthquake hazard level.
b. For Risk Category III, the Tier 1 screening checklists shall be based on the Collapse Prevention, except that checklist statements using the Quick Check provisions shall be based on MS-factors that are the average of the values for Collapse Prevention and Life Safety.
c. For Risk Category IV, the Tier 1 screening checklists shall be based on Collapse Prevention, except that checklist statements using the Quick Check provisions shall be based on MS-factors for Life Safety.
Table 405.2.7.3
REFERENCED STANDARDS
Standard Reference
Number Title Referenced in Code
Section Number
ASCE 41-17
Seismic Evaluation and
Retrofit of Existing
Buildings
405.2.7
Table 405.2.7.1
405.2.7.2
Table 405.2.7.2
Article 7. Technical Amendments to Structural Standards
19.28.080 Various Technical Amendments to Structural Standards.
Chapter 17 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below.
1705.3 Concrete construction. Special inspections and tests of concrete construction shall be performed in accordance with this section and Table 1705.3.
Exception: Special inspections and tests shall not be required for:
1. Isolated spread concrete footings of buildings three stories or less above grade plane that are fully supported on earth or rock, where the structural design of the footing is based on a specified compressive strength, f’ c, no greater than 2,500 pounds per square inch (psi) (17.2 MPa).
2. Continuous concrete footings supporting walls of buildings three stories or less above grade plane that are fully supported on earth or rock where:
2.1.The footings support walls of light-frame construction.
2.2.The footings are designed in accordance with Table 1809.7.
2.3.The structural design of the footing is based on a specified compressive strength, f′c, not more than 2,500 pounds per square inch (psi) (17.2 MPa), regardless of the compressive strength specified in the approved construction documents or used in the footing
construction.
3. Nonstructural concrete slabs supported directly on the ground, including prestressed slabs on grade, where the effective prestress in the concrete is less than 150 psi (1.03 MPa).
4. Concrete foundation walls constructed in accordance with Table 1807.1.6.2.
5. Concrete patios, driveways and sidewalks, on grade.
Chapter 19 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below.
1905.6 Structural plain concrete. Structural plain concrete elements shall comply with this section in lieu of Section 14.1.4 of ACI 318.
1905.6.2 Seismic Design Categories C, D, E and F. Structures assigned to Seismic Design Category C, D, E or F shall not have elements of structural plain concrete, except as follows:
1. Reserved Structural plain concrete basement, foundation or other walls below the base as defined in ASCE/SEI 7 are permitted in detached one- and two- family dwellings three stories or less in height constructed with stud-bearing walls. In dwellings assigned to Seismic Design Category D or E, the height of the wall shall not exceed 8 feet (2438 mm), the thickness shall be not less than 7 1/2 inches (190 mm), and the wall shall retain not more than 4 feet (1219 mm) of unbalanced fill. Walls shall have reinforcement in accordance with Section 14.6.1 of ACI 318.
2. Isolated footings of plain concrete supporting pedestals or columns are permitted, provided that the projection of the footing beyond the face of the supported member does not exceed the footing thickness.
Exception: In detached one- and two-family dwellings three stories or less in height, the projection of the footing beyond the face of the supported member is permitted to exceed the footing thickness.
3. Plain concrete footings supporting walls are permitted, provided that the footings have not fewer than two continuous longitudinal reinforcing bars. Bars shall not be smaller than No. 4 and shall have a total area of not less than 0.002 times the gross cross-sectional area of the footing. For footings that exceed 8 inches (203 mm) in thickness, not fewer than A minimum of one bar shall be provided at the top and bottom of the footing. Continuity of reinforcement shall be provided at corners and intersections.
Exceptions:
a. Where assigned to Seismic Design Category C, detached one- and two- family dwellings three stories or less in height constructed with stud- bearing walls are permitted to have plain concrete footings without longitudinal reinforcement.
b. For foundation systems consisting of a plain concrete footing and a plain concrete stemwall, not fewer than one bar shall be provided at the top of the stemwall and at the bottom of the footing.
c. Footings cast monolithically with a slab-on-ground shall have not fewer than one No. 4 bar at the top and bottom of the footing or one No. 5 bar or two No. 4 bars in the middle third of the footing depth.
Article 8. Construction of Exterior Appurtenances
19.28.090 Technical Amendments for Construction of Exterior Projecting Elements and Appurtenances.
Chapter 12 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below:
1202.7 Ventilation of weather exposed enclosed assemblies. Balconies, landings, decks, stairs and similar exterior projecting elements and appurtenances exposed to the weather and sealed underneath shall have cross ventilation for each separate enclosed space by ventilation openings protected against the entrance of rain and snow and as set forth in Section 2304.12.2.5. Blocking and bridging shall be arranged so as not to interfere with the movement of air. The net free ventilating area shall not be less than 1/150th of the area of the space ventilated. Ventilation openings shall comply with Section 1202.2.2.
An access panel of sufficient size shall be provided on the underside of the enclosed space to allow for periodic inspection.
Exceptions:
1. An access panel is not required where the exterior coverings applied to the underside of joists are easily removable using only common tools.
2. Removable soffit vents 4 inches minimum in width can be used to satisfy both ventilation and access panel requirements.
Chapter 14 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below:
1403.15 Projections exposed to weather. Balconies, landings, decks, stairs and similar floor projections exposed to the weather shall be constructed of naturally durable wood, preservative-treated wood, corrosion resistant (e.g., galvanized) steel, or similar approved materials.
Chapter 23 of the 2025 California Building Code is adopted in its entirety subject to the modifications thereto which are set forth below:
2304.12.2.3 Supporting members for permanent appurtenances. Naturally durable or preservative-treated wood shall be utilized for those portions of wood members that form the structural supports of buildings, balconies, porches or similar permanent building appurtenances where such members are exposed to the weather without
adequate protection from a roof, eave, overhang or other covering to prevent moisture or water accumulation on the surface or at joints between members.
Exception: Sawn lumber in buildings located in a geographical region where experience has demonstrated that climatic conditions preclude the need to use durable materials where the structure is exposed to the weather. 2304.12.2.4 Supporting members for permeable floors and roofs. Wood structural members that support moisture-permeable floors or roofs that are exposed to the weather, such as concrete or masonry slabs, shall be of naturally durable or preservative-treated wood unless and shall be separated from such floors or roofs by an impervious moisture barrier. The impervious moisture barrier system protecting the structure supporting floors shall provide positive drainage of water that infiltrates the moisture-permeable floor topping.
Table 2308.10.1 WALL BRACING REQUIREMENTS a, f, g
Add new footnotes “f” and “g” to the end of Table 2308.10.1 to read:
f. Methods GB, PBS, HPS and SFB are not permitted in Seismic Design Categories D or E. In Seismic Design Categories D, the use of Method PCP is limited to one-story dwellings and accessory structures. g. Methods DWB and PCP are not permitted in Seismic Design Categories E.
Article 9. Emergency Housing
19.28.100 Emergency Housing and Emergency Housing Facilities.
HCD Appendix Q of the 2025 California Building Code is adopted on an emergency basis and reproduced in its entirety subject to the modifications thereto which are set forth below:
APPENDIX Q
EMERGENCY HOUSING
SECTION Q101 - GENERAL
Q101.1 Scope. This appendix shall be applicable to emergency housing and emergency housing facilities, as defined in Section Q102. The provisions and standards set forth in this appendix shall be applicable to emergency housing established pursuant to the declaration of a shelter crisis under Government Code section 8698 et seq. and located in new or existing buildings, structures, or facilities owned, operated, erected, or constructed by, for or on behalf of the City of Berkeley on land owned or leased by the City of Berkeley.
Q101.2 Application. Notwithstanding any provisions of this Code to the contrary, the following requirements shall apply to emergency housing operated during a shelter crisis, as provided for in Government Code Section 8698 et seq. Other than the specific requirements set forth in this appendix, the facilities need not comply with the
requirements of this Code for Group R occupancies unless otherwise specified in this Code.
SECTION Q102 - DEFINITIONS
Q102.1 General. The following words and terms shall, for the purposes of this appendix, have the meanings shown herein. Refer to Chapter 2 of this code for general definitions.
DECLARATION OF SHELTER CRISIS. The duly proclaimed existence of a situation in which a significant number of persons are without the ability to obtain shelter, resulting in a threat to their health and safety. (See Government Code Section 8698) DEPENDENT UNIT. Emergency housing not equipped with a kitchen area, toilet, and sewage disposal system. Recreational vehicles that are not self-contained and without utility service connections shall be considered dependent units.
EMERGENCY HOUSING. Housing in a permanent or temporary structure(s), occupied during a declaration of state of emergency, local emergency, or shelter crisis.
Emergency housing may include, but is not limited to, buildings and structures constructed in accordance with the California Building Standards Code; and emergency sleeping cabins, emergency transportable housing units, and tents constructed in accordance with this appendix.
EMERGENCY HOUSING FACILITIES. On-site common use facilities supporting emergency housing. Emergency housing facilities include, but are not limited to, kitchen areas, toilets, showers and bathrooms with running water. The use of emergency housing facilities is limited exclusively to the occupants of the emergency housing, personnel involved in operating the housing, and other emergency personnel.
EMERGENCY HOUSING SITE. A site containing emergency housing and emergency housing facilities supporting the emergency housing.
EMERGENCY SLEEPING CABIN. Relocatable hard-sided structure constructed in accordance with this appendix, which may be occupied only for emergency housing if allowed by the enforcing agency.
EMERGENCY TRANSPORTABLE HOUSING UNIT. A single- or multiple-section prefabricated structure that is transportable by a vehicle and that can be installed on a permanent or temporary site in response to a need for emergency housing. Emergency transportable housing units include, but are not limited to, manufactured homes, mobilehomes, multifamily manufactured homes, recreational vehicles, and park trailers.
For the purposes of this appendix, emergency transportable housing units may also include commercial modulars as defined in the Health and Safety Code Section 18001.8, if approved by the enforcing agency.
Emergency transportable housing units do not include factory-built housing as defined in the Health and Safety Code Section 19971.
LANDING PLATFORM. A landing provided as the top step of a stairway accessing a loft.
LOCAL EMERGENCY. Local Emergency as defined in the Government Code, Section 8558.
LOFT. A floor level located more than 30 inches (762 mm) above the main floor and open to it on at least one side with a ceiling height of less than 6 feet 8 inches (2032 mm), used as a living or sleeping space.
MANUFACTURED HOME. A structure designed to be used as a single-family dwelling, as defined in the Health and Safety Code, Section 18007.
MEMBRANE STRUCTURE. An air-inflated, air-supported, cable or frame-covered structure, not otherwise defined as a tent. (See Chapter 31 of this code.) MOBILEHOME. A structure designed to be used as a single-family dwelling, as defined in the Health and Safety Code, Section 18008.
MULTIFAMILY MANUFACTURED HOME. A structure designed to contain not less than two dwelling units, as defined in the Health and Safety Code, Section 18008.7.
PARK TRAILER. A trailer designed for human habitation that meets all requirements in the Health and Safety Code, Section 18009.3.
RECREATIONAL VEHICLE. A motor home, travel trailer, truck camper, or camping trailer, with or without motive power, designed for human habitation, that meets all requirements in the Health and Safety Code, Section 18010.
STATE OF EMERGENCY. State of Emergency as defined in the Government Code, Section 8558.
TENT. A structure, enclosure or shelter, with or without sidewalls or drops, constructed of fabric or pliable material supported by any manner except by air or the contents that it protects.
SECTION Q103 - EMERGENCY HOUSING
Q103.1 General. Emergency sleeping cabins, emergency transportable housing units including commercial modulars, membrane structures and tents constructed and/or assembled in accordance with this appendix, shall be occupied only during declaration of state of emergency, local emergency, or shelter crisis.
Buildings and structures constructed in accordance with the California Building Standards Code, used as emergency housing, shall be permitted to be permanently occupied.
Q103.2 Existing buildings. Existing residential and nonresidential buildings or structures shall be permitted to be used as emergency housing and emergency housing facilities provided such buildings or structures comply with the building code provisions and/or other regulations in effect at the time of original construction and/or alteration. Existing buildings or structures used as emergency housing shall not become or continue to be substandard buildings, as determined by the enforcing agency.
Q103.2.1 New additions, alterations, and change of occupancy. New additions, alterations, and change of occupancy to existing buildings shall comply with the requirements of the California Building Standards Code effective at the time of addition, alteration, or change of occupancy. The requirements shall apply only to and/or within the specific area of the addition, alteration, or change of occupancy.
Exceptions:
1. Existing buildings and structures used for emergency housing and emergency housing facilities may not be required to comply with the California Energy Code, as determined by the enforcing agency.
2. Change in occupancy shall not mandate conformance with new construction requirements set forth in the California Building Standards Code, provided such change in occupancy meets the minimum fire and life safety requirements set forth in Section Q112 of this appendix.
Q103.3 Occupant load. Except as otherwise stated in this appendix, the maximum occupant load allowed in buildings and structures used as emergency housing shall be determined by the enforcing agency, but the interior floor area shall not be less than 70 square feet (6.5 m 2) for one occupant. Where more than one person occupies the building/structure, the required floor area shall be increased at the rate of 50 square feet (4.65 m2) for each occupant in excess of one.
Exceptions:
1. Tents.
2. Recreational vehicles and park trailers designed for human habitation that meet the requirements in the Health and Safety Code, Sections 18009.3 and 18010, as applicable
3. For emergency housing, including emergency sleeping cabins, the minimum interior floor area may be reduced to 53 square feet (4.9 m2) if the enforcing agency determines that 53 square feet (4.9 m2) is adequate space for a single- occupancy sleeping unit.
Q103.4 Fire and life safety requirements not addressed in this appendix. If not otherwise addressed in this appendix, fire and life safety measures, including, but not limited to, means of egress, fire separation, fire sprinklers, smoke alarms, and carbon monoxide alarms, shall be determined and enforced by the enforcing agency.
Q103.5 Privacy. Emergency housing shall be provided with a privacy lock on each entrance door and all windows for use by the occupants.
Q103.6 Heating. All sleeping areas shall be provided with adequate heating as determined by the enforcing agency.
SECTION Q104 - EMERGENCY SLEEPING CABINS
Q104.1 General. Emergency sleeping cabins shall have an interior floor area of not less than 70 square feet (6.5 m2) for one occupant. Where more than one person occupies the cabin, the required floor area shall be increased at the rate of 50 square feet (4.65 m2) for each occupant in excess of one. The interior floor area shall not exceed 400 square feet (37 m2), excluding lofts.
Q104.2 Live loads. Emergency sleeping cabins shall be designed to resist intrusion of wind, rain, and to support the following live loads:
1. Floor live loads not less than 40 pounds per square foot (1.92 kPa) of floor area.
2. Horizontal live loads not less than 15 pounds per square foot (718 Pa) of vertical wall and roof area.
3. Roof live loads not less than 20 pounds per square foot (958 Pa) of horizontal roof area.
4. In areas where snow loads are greater than 20 pounds per square foot (958 Pa), the roof shall be designed and constructed to resist these additional loads.
Q104.3 Minimum ceiling height. Habitable space and hallways in emergency sleeping cabins shall have a ceiling height of not less than 80 inches (2032 mm). Bathrooms, toilet rooms, and kitchens, if provided, shall have a ceiling height of not less than 76 inches (1930 mm). Obstructions shall not extend below these minimum ceiling heights including beams, girders, ducts, lighting and other obstructions.
Exception: Ceiling heights in lofts constructed in accordance with Section Q108 are permitted to be less than 80 inches (2032 mm).
Q104.4 Means of egress. Emergency sleeping cabins shall be provided with at least two forms of egress placed remotely from each other. One form of egress may be an egress window complying with Section Q104.4.1. When a loft is provided, one form of egress shall be an egress window complying with Section Q104.4.1, provided in the loft space.
Q104.4.1 Egress window. The bottom of the clear opening of the egress window shall not be more than 44 inches (1118 mm) above the floor. The egress window shall have a minimum net clear opening height of 24 inches (610 mm), and a minimum net clear opening width of 20 inches (508 mm). The egress window shall have a minimum net clear opening area of 5 square feet (0.465 m2).
Q104.5 Plumbing and gas service. If an emergency sleeping cabin contains plumbing or gas service, it shall comply with all applicable requirements of the California Plumbing Code and the California Mechanical Code.
Q104.6 Electrical. Emergency sleeping cabins shall be provided with all of the following installed in compliance with the California Electrical Code:
1. Continuous source of electricity.
Exception: The source of electricity may be an emergency generator or renewable source of power such as solar or wind power.
2. At least one interior lighting fixture.
3. Electrical heating equipment listed for residential use and a dedicated receptacle outlet for the electrical heating equipment.
Exception: Electrical heating equipment and a dedicated receptacle outlet for the electrical heating equipment are not required if a nonelectrical source of heating is provided.
4. At least one GFCI-protected receptacle outlet for use by the occupant(s).
Q104.7 Ventilation. Emergency sleeping cabins shall be provided with means of ventilation (natural and/or mechanical) allowing for adequate air replacement, as determined by the enforcing agency.
Q104.8 Smoke alarms. Emergency sleeping cabins shall be provided with at least one smoke alarm installed in accordance with the California Residential Code, Section R314.
Q104.9 Carbon monoxide alarms. If an emergency sleeping cabin contains a fuel- burning appliance(s) or a fireplace(s), a carbon monoxide alarm shall be installed in accordance with the California Residential Code, Section R315 SECTION Q105 - EMERGENCY TRANSPORTABLE HOUSING UNITS
Q105.1 General. In addition to the requirements in this appendix, manufactured homes, mobilehomes, multifamily manufactured homes, commercial modulars, recreational vehicles, and park trailers used as emergency transportable housing shall comply with all applicable requirements in the Health and Safety Code, Division 13, Part 2; and Title 25, Division 1, Chapter 3, Subchapter 2.
No provisions of Sections Q111 through Q114 of this appendix shall be deemed to grant authorization for any additional work that may conflict with the standards specified in Section Q105 applicable for emergency transportable housing units.
SECTION Q106 - TENTS AND MEMBRANE STRUCTURES
Q106.1 General. Tents shall not be used to house occupants for more than 7 days unless such tents are maintained with tight wooden floors raised at least 4 inches (101.6 mm) above the ground level and are equipped with baseboards on all sides to a height of at least 6 inches (152.4 mm). Tents may be maintained with concrete slabs with the finished surface at least 4 inches (101.6 mm) above grade and equipped with curbs on all sides at least 6 inches (152.4 mm) high.
A tent shall not be considered a suitable sleeping place when it is found necessary to provide heating facilities in order to maintain a minimum temperature of 50 degrees Fahrenheit (10 degrees Celsius) within such tent during the period of occupancy.
Membrane structures installed and/or assembled in accordance with Chapter 31 of this code, may be permitted to be used as emergency housing and emergency housing facilities, as determined by the enforcing agency.
Tents and membrane structures shall comply with Chapter 31 of the California Fire Code and shall not be erected for a period of more than 180 days within a 12 month period.
Tents and membrane structures shall be limited to one level located at the level of Fire Department vehicle access road or lane. Tents and membrane structures complying with Chapter 31 of the California Fire Code shall not be subject to additional provisions of Sections Q111 and Q112 of this appendix.
Tents and membrane structures used for sleeping purposes shall be equipped with single station battery powered smoke alarms installed in accordance with Section 907.2.11 of the California Fire Code.
SECTION Q107 - ACCESSIBILITY
Q107.1 General. Emergency housing shall comply with the applicable requirements in Chapter 11B and/or the US Access Board Final Guidelines for Emergency Transportable Housing.
Note: The Architectural and Transportation Barriers Compliance Board (US Access Board) issued the Final Guidelines for Emergency Transportable Housing on May 7, 2014. The final guidelines amended the 2004 ADA Accessibility Guidelines (2004 ADAAG) and the 2004 Architectural Barriers Act (ABA) Accessibility Guidelines (2004 ABAAG) to specifically address emergency transportable housing units provided to disaster survivors by entities subject to the ADA or ABA. The final rule ensures that the emergency transportable housing units are readily accessible to and usable by disaster survivors with disabilities.
SECTION Q108 - LOFTS IN EMERGENCY HOUSING
Q108.1 Minimum loft area and dimensions. Lofts used as a sleeping or living space shall meet the minimum area and dimension requirements of Sections Q108.1.1 through Q108.1.3.
Q108.1.1 Minimum area. Lofts shall have a floor area of not less than 35 square feet (3.25 m2).
Q108.1.2 Minimum dimensions. Lofts shall be not less than 5 feet (1524 mm) in any horizontal dimension.
Q108.1.3 Height effect on loft area. Portions of a loft with a sloping ceiling measuring less than 3 feet (914 mm) from the finished floor to the finished ceiling shall not be considered as contributing to the minimum required area for the loft.
Exception: Under gable roofs with a minimum slope of 6:12, portions of a loft with a sloping ceiling measuring less than 16 inches (406 mm) from the finished floor to the finished ceiling shall not be considered as contributing to the minimum required area for the loft.
Q108.2 Loft access. The access to and primary egress from lofts shall be any type described in Sections Q108.2.1 through Q108.2.4.
Q108.2.1 Stairways. Stairways accessing lofts shall comply with the California Residential Code or with Sections Q108.2.1.1 through Q108.2.1.6.
Q108.2.1.1 Width. Stairways accessing a loft shall not be less than 17 inches (432 mm) in clear width at or above the handrail. The minimum width below the handrail shall be not less than 20 inches (508 mm).
Q108.2.1.2 Headroom. The headroom in stairways accessing a loft shall be not less than 74 inches (1880 mm), as measured vertically, from a sloped line connecting the tread or landing platform nosings in the middle of their width.
Q108.2.1.3 Treads and risers. Risers for stairs accessing a loft shall be not less than 7 inches (178 mm) and not more than 12 inches (305 mm) in height. Tread depth and riser height shall be calculated in accordance with one of the following formulas:
1. The tread depth shall be 20 inches (508 mm) minus 4/3 of the riser height, or
2. The riser height shall be 15 inches (381 mm) minus 3/4 of the tread depth.
Q108.2.1.4 Landing platforms. The top step of stairways accessing lofts shall be constructed as a landing platform where the loft ceiling height is less than 74 inches (1880 mm). The landing platform shall be 18 inches (457 mm) to 22 inches (559 mm) in depth measured from the nosing of the landing platform to the edge of the loft, and 16 inches (406 mm) to 18 inches (457 mm) in height measured from the landing platform to the loft floor.
Q108.2.1.5 Handrails. Handrails shall comply with the California Residential Code, Section R311.7.8.
Q108.2.1.6 Stairway guards. Guards at open sides of stairways shall comply with the California Residential Code, Section R312.1.
Q108.2.2 Ladders. Ladders accessing lofts shall comply with Sections Q108.2.2.1 and Q108.2.2.2.
Q108.2.2.1 Size and capacity. Ladders accessing lofts shall have a rung width of not less than 12 inches (305 mm), and 10 inches (254 mm) to 14 inches (356 mm) spacing between rungs. Ladders shall be capable of supporting a 200 pound (90.7 kg) load on any rung. Rung spacing shall be uniform within 3/8-inch (9.5 mm).
Q108.2.2.2 Incline. Ladders shall be installed at 70 to 80 degrees from horizontal.
Q108.2.3 Alternating tread devices. Alternating tread devices are acceptable as allowed by the enforcing agency.
Q108.2.4 Loft guards. Loft guards shall be located along the open side of lofts. Loft guards shall not be less than 36 inches (914 mm) in height or one-half of the clear height to the ceiling, whichever is less. Loft guards shall not have openings from the walking surface to the required guard height that allow passage of a sphere 4 inches (102mm) in diameter.
SECTION Q109 - LOCATION, MAINTENANCE AND IDENTIFICATION Q109.1 Maintenance. Emergency housing and emergency housing facilities shall be maintained in a safe and sanitary condition, and free from vermin, vectors and other matter of an infectious or contagious nature. The grounds within emergency housing sites shall be kept clean and free from accumulation of debris, filth, garbage and deleterious matter. Emergency housing and emergency housing facilities shall not be occupied if a substandard condition exists, as determined by the enforcing agency.
Q109.1.1 Fire hazards. Dangerous materials or materials that create a fire hazard, as determined by the enforcing agency, shall not be allowed on the grounds within emergency housing sites.
Q109.3 Identification. Emergency housing shall be designated by address numbers, letters, or other suitable means of identification. The identification shall be in a conspicuous location facing the street or driveway fronting the building or structure. Each identification character shall be not less than 4 inches (102 mm) in height and not less than 0.5 inch (12.7 mm) in width, installed/painted on a contrasting background.
SECTION Q110 - EMERGENCY HOUSING FACILITIES SANITATION
REQUIREMENTS
Q110.1 Drinking water. Potable drinking water shall be provided for all occupants of emergency housing.
Q110.2 Kitchens and food facilities. Where provided, kitchens and food facilities, as defined in Section 113789 of the California Health and Safety Code, which support emergency housing sites, shall comply with applicable food safety provisions of Sections 113980 – 114094.5 of the California Health and Safety Code.
Where occupants of dependent units are permitted or required to cook for themselves, a separate area shall be equipped and maintained as a common use kitchen.
Refrigerated storage shall be provided for safe storage of food.
Q110.3 Toilet and bathing facilities. When dependent units are used as emergency housing, the emergency housing site shall be provided with one toilet and one bathing facility for every 15 occupants of each gender. The enforcing agency may permit different types and ratios of toilet and bathing facilities. The approval shall be based upon a finding that the type and ratio of toilet and bathing facilities are sufficient to process the anticipated volume of sewage and waste water, while maintaining sanitary conditions for the occupants of the emergency housing.
Bathing facilities shall be provided with heating equipment which shall be capable of maintaining a temperature of 70 degrees F (21.0 degrees Celsius) within such facilities.
Lavatories with running water shall be installed and maintained in the toilet facilities or adjacent to the toilet facilities.
Q110.4 Garbage, waste and rubbish disposal. All garbage, kitchen waste and rubbish shall be deposited in approved covered receptacles, which shall be emptied when filled and the contents shall be disposed of in a sanitary manner acceptable to the enforcing agency.
SECTION Q111 - EMERGENCY HOUSING LIGHTING AND VENTILATION
REQUIREMENTS
Q111.1 Lighting. Buildings or structures used for emergency housing shall be provided with natural light by means of exterior glazed openings in accordance with Section 1204.2 of the California Building Code, or shall be provided with artificial light in accordance with Section 1204.3 of the California Building Code.
Q111.2 Ventilation. Buildings or structures used for emergency housing shall be provided with natural ventilation in accordance with Section 1202.5 of the California Building Code, or mechanical ventilation in accordance with the California Mechanical Code.
SECTION Q112 - EMERGENCY HOUSING FIRE AND LIFE SAFETY REQUIREMENTS
Q112.1 Location on property. Buildings or structures used for emergency housing, including sleeping cabins, shall be located in accordance with the requirements of Section 705 and Table 705.5 of the California Building Code, based on their type of construction and fire-resistance ratings of the exterior walls. During a shelter crisis, the fire separation distances are permitted to be measured to the existing buildings on the adjacent parcels rather than to the interior lot lines, provided the open spaces are to remain unobstructed for the duration of the shelter crisis.
Q112.2 Buildings on same lot. Buildings or structures used for emergency housing, including sleeping cabins, shall be separated from each other and from other buildings on the same lot as set forth in Section 705.3 of the California Building Code. The Building Official and Fire Marshal may accept reasonable alternatives to these requirements provided reasonably equivalent fire and life safety is achieved.
Q112.3 Means of egress. Buildings or structures used for emergency housing shall be provided with means of egress complying with Chapter 10 of the California Building Code, unless modified elsewhere in this appendix.
Q112.4 Emergency escape and rescue. Each area of a building or structure used for sleeping purposes in emergency housing shall be provided with an emergency escape and rescue opening in accordance with Section 1031 of the California Building Code, unless modified elsewhere in this appendix.
Q112.5 Smoke alarms. Buildings or structures used for emergency housing, which provide sleeping accommodations, shall be equipped with single station battery powered smoke alarms installed in accordance with the location requirements of Section 907.2.11 of the California Fire Code, unless modified elsewhere in this appendix.
Q112.6 Carbon monoxide alarms. Buildings or structures used for emergency housing, which provide sleeping accommodations, and equipped with fuel-burning appliances shall be provided with carbon monoxide detection in accordance with Section 915 of the California Fire Code, unless modified elsewhere in this appendix.
Q112.7 Fire alarm. A manual fire alarm system capable of arousing sleeping occupants in accordance with Section 907.2.9.1 of the California Fire Code shall be installed in buildings, structures, or groups of buildings or structures used for emergency housing and having a gross floor area of more than 2,500 square feet or having more than 49 sleeping occupants.
Exception: Individual buildings or structures in a group of buildings or structures with sufficient separation distances to allow each building or structure to function independently in case of a fire, as approved by the Fire Marshal.
Q112.8 Automatic sprinkler systems. Fire sprinklers shall be provided for new and existing buildings or structures used for emergency housing, including sleeping cabins,
which provide sleeping facilities, as required by Section 903.3 of the California Fire Code. Strict compliance with the requirements of Section 903.3 may not be required when approved by the Fire Marshal. The Fire Marshal is authorized to accept reasonably equivalent alternatives to the installation provisions of Section 903.3 when dealing with buildings or structures used for emergency housing.
Q112.9 Fire extinguishers. Portable fire extinguishers shall be provided in accordance with Section 906.1 of the California Fire Code.
Q112.10 Flammable or combustible liquids. The possession or storage of any flammable or combustible liquids or gases shall not be permitted (intact cigarette lighters excepted). The use of any type of open flame indoors is prohibited unless conditionally approved by the Fire Chief.
Q112.11 Storage in attics, under-floor and concealed spaces. Combustible materials, including but not limited to the possessions of occupants, users and staff shall not be stored in attics, under-floor spaces, or within other concealed spaces of buildings or structures used for emergency housing with sleeping accommodations.
Q112.12 Fire department access. Fire Department access to building and premises used for emergency housing shall be in compliance with Section 503, Section 504 and Appendix D of the California Fire Code, as approved by the Fire Chief.
Q112.13 Water supply. An approved fire protection water supply complying with Section 507 of the California Fire Code, or as approved by the Fire Chief, shall be provided for each structure, group of structures or premises used for emergency housing.
SECTION Q113
ADDITIONAL REQUIREMENTS
Q113.1 Operating procedures. Operating procedures including a security plan and service requirements shall be developed by the professional service provider and shown to be consistent with the shelter standards imposed by the Alameda County Social Services Agency. These procedures shall be designed to maintain order and safety within the buildings or structures used for emergency housing.
SECTION Q114
ALTERNATIVES AND MODIFICATIONS
Q114.1 Alternatives and modifications. Alternative compliance and/or modifications that are reasonably equivalent to the requirements in this appendix may be granted by the Local Administrative Authority in individual cases when dealing with buildings or structures used for emergency housing.
NOTE:
Authority Cited: Health and Safety Code Sections 17040, 17050, 17920.9, 17921, 17921.5, 17921.6, 17921.10, 17922, 17922.6, 17922.12, 17922.14, 17927, 17928, 18300, 18552, 18554, 18620, 18630, 18640, 18670, 18690, 18691, 18865, 18871.3, 18871.4, 18873, 18873.1 through 18873.5, 18938.3, 18944.11, and 19990; and Government Code Section 12955.1.
Reference: Health and Safety Code Sections 17000 through 17062.5, 17910 through 17995.5, 18200 through 18700, 18860 through 18874, and 19960 through 19997; Civil Code Sections 1101.4 and 1101.5; and Government Code Sections 12955.1 and 12955.1.1. (Ord. 7613-NS § 3, 2018)
Section 2. That Berkeley Municipal Code Chapter 19.29 is hereby repealed and reenacted to read as follows:
Chapter 19.29
BERKELEY RESIDENTIAL CODE
Sections:
19.29.010 Adoption of California Residential Code.
19.29.020 Title.
19.29.030 Administrative Provisions.
19.29.040 Subsection R301.2 Climatic and Geographic Design Criteria.
19.29.050 Technical Amendments to Structural Standards.
19.29.010 Adoption of California Residential Code.
The California Residential Code, 2025 Edition, as adopted in Title 24 Part 2.5 of the California Code of Regulations, including Appendices BB, BF, BI, BJ, BK and CI is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. A copy of this Code is on file for use and examination by the public in the office of the City Clerk of the City of Berkeley.
19.29.020 Title.
This Code shall be known as the "Berkeley Residential Code" and may be cited as "this Code".
19.29.030 Administrative provisions.
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any California Residential Code (CRC) administrative provisions that may conflict.
For regulations governing wood burning appliances see BMC 19.28.040.
19.29.040 CRC Subsection R301.2 Climatic and geographic design criteria.
TABLE R301.2
CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA
ICE BARRIER
UNDERLAYMENT
REQUIREDh
FLOOD
HAZARDSg
AIR FREEZING
INDEXi MEAN ANNUAL TEMPj
NO See
Footnote ‘p’ ZERO 57.2◦F
MANUAL J DESIGN CRITERIAn
Elevation
Altitude
correction
factor e
Coincident
wet bulb
Indoor
winter
design
relative
humidity
Indoor
winter
design
dry-bulb
temperature
Outdoor
winter design
dry-bulb
temperature
Heating
temperature
difference
345 N/A 63 N/A 70 40 30
Latitude Daily
range
Indoor
summer
design
relative
humidity
Summer
Design
Grains
Indoor
summer
design
dry-bulb
temperature
Outdoor
summer
design
dry-bulb
temperature
Cooling
temperature
difference
38 16 50 -6 75 80 5
For SI: 1 pound per square foot = 0.0479 kPa, 1 mile per hour = 0.447 m/s. a. Where weathering requires a higher strength concrete or grade of masonry than necessary to satisfy the structural requirements of this code, the frost line depth strength required for weathering shall govern. The weathering column shall be filled in with the weathering index, “negligible,” “moderate” or “severe” for concrete as determined from Figure R301.2(1). The grade of masonry units shall be determined from ASTM C34, ASTM C55, ASTM C62, ASTM C73, ASTM C90, ASTM C129, ASTM C145, ASTM C216 or ASTM C652.
b. Where the frost line depth requires deeper footings than indicated in Figure R403.1(1), the frost line depth strength required for weathering shall govern. The jurisdiction shall fill in the frost line depth column with the minimum depth of footing below finish grade.
WIND DESIGN SUBJECT TO DAMAGE FROM
GROUND
SNOW
LOADo
Speedd
(mph)
Topographic
effectsk
Special
wind
regionl
Wind-
borne
debris
zonem
SEISMIC
DESIGN
CATEGORYf Weatheringa Frost line
depthb Termitec
ZERO 95 NO NO NO D2 or E NEGLIGIBLE N/A VERY
HEAVY
c. The jurisdiction shall fill in this part of the table to indicate the need for protection depending on whether there has been a history of local subterranean termite damage.
d. The jurisdiction shall fill in this part of the table with the wind speed from the ultimate design wind speeds map [Figure R301.2(2)]. Wind exposure category shall be determined on a site-specific basis in accordance with Section R301.2.1.4. e. The jurisdiction shall fill in this section of the table to establish the design criteria using Table 10A from ACCA Manual J or established criteria determined by the jurisdiction.
f. The jurisdiction shall fill in this part of the table with the seismic design category determined from Section R301.2.2.1.
g. The jurisdiction shall fill in this part of the table with: the date of the jurisdiction’s entry into the National Flood Insurance Program (date of adoption of the first code or ordinance for management of flood hazard areas); and the title and date of the currently effective Flood Insurance Study or other flood hazard study and maps adopted by the authority having jurisdiction, as amended. h. In accordance with Sections R905.1.2, R905.4.3.1, R905.5.3.1, R905.6.3.1, R905.7.3.1 and R905.8.3.1, where there has been a history of local damage from the effects of ice damming, the jurisdiction shall fill in this part of the table with “YES.” Otherwise, the jurisdiction shall fill in this part of the table with “NO.” i. The jurisdiction shall fill in this part of the table with the 100-year return period air freezing index (BF-days) from Figure R403.3(2) or from the 100-year (99 percent) value on the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32°F).”
j. The jurisdiction shall fill in this part of the table with the mean annual temperature from the National Climatic Data Center data table “Air Freezing Index-USA Method (Base 32°F).”
k. In accordance with Section R301.2.1.5, where there is local historical data documenting structural damage to buildings due to topographic wind speed-up effects, the jurisdiction shall fill in this part of the table with “YES.” Otherwise, the jurisdiction shall indicate “NO” in this part of the table. l. In accordance with Figure R301.2(2), where there is local historical data documenting unusual wind conditions, the jurisdiction shall fill in this part of the table with “YES” and identify any specific requirements. Otherwise, the jurisdiction shall indicate “NO” in this part of the table.
m. In accordance with Section R301.2.1.2 the jurisdiction shall indicate the wind-borne debris wind zone(s). Otherwise, the jurisdiction shall indicate “NO” in this part of the table.
n. The jurisdiction shall fill in these sections of the table to establish the design criteria using Table 1a or 1b from ACCA Manual J or established criteria determined by the jurisdiction.
o. The jurisdiction shall fill in this section of the allowable stress design table using the Ground Snow Loads in Figure R301.2(3).
p. Flood Hazard Data for the City of Berkeley:
Date of Jurisdiction’s Entry into the NFIP: December 7, 1973;
Date of adoption of the first code or ordinance for management of flood hazards:
Ordinance No. 5085-N.S., July 25, 1978;
Date of Flood Insurance study: Aug 3, 2009;
Panel numbers and dates of all currently effective maps adopted by the AHJ (Ordinance 7108-NS 9/29/09):
FEMA’s “Use of Digital Flood Hazard Data” establishes that paper and digital maps are equivalent. Policy and related information are available from FEMA.
The policy implements section 107 of Public Law 108-264, 118 Stat. 724 (2004) Panel 13 (not available in printed form)
Panel 14 of 725, Map Number 06001C0014G, August 3, 2009 Panel 18 of 725, Map Number 06001C0018G, August 3, 2009 Panel 19 of 725, Map Number 06001C0019G, August 3, 2009 Panel 38 (not available in printed form)
Panel 51 (not available in printed form)
Panel 52 of 725, Map Number 06001C0052G, August 3, 2009 Panel 53 (not available in printed form)
Panel 54 of 725, Map Number 06001C0054G, August 3, 2009 Panel 56 of 725, Map Number 06001C0056G, August 3, 2009 Panel 57 of 725, Map Number 06001C0057G, August 3, 2009 Panel 80 of 725, Map Number 06001C0080G, August 3, 2009
19.29.050 Technical Amendments to Structural Standards
Chapter 6 of the 2025 California Residential Code is adopted in its entirety subject to the modifications thereto which are set forth below.
Table R602.10.3(3) BRACING REQUIREMENTS BASED ON SEISMIC DESIGN CATEGORYi, j
Add new footnotes “i” and “j” to the end of Table R602.10.3(3) to read:
i. Methods GB, PBS, HPS and SFB are not permitted in Seismic Design Categories D0, D1, and D2.
j.Method DWB are not permitted in Seismic Design Categories D 0, D 1, and D 2 where S1 is greater than or equal to 0.75.
Add a new Subsection R602.10.4.5, to read:
R602.10.4.5 Limits on methods GB and PCP. In Seismic Design Categories D0, D 1, and D2, Method GB is not permitted, but gypsum board is permitted to be placed on the opposite side of the studs from other types of braced wall panel sheathing. In Seismic Design Categories D0, D1, and D2, the use of Method PCP is limited to one-story dwellings and accessory structures.
Section 3. That Berkeley Municipal Code Chapter 19.30 is hereby repealed and
reenacted to read as follows:
Chapter 19.30
BERKELEY ELECTRICAL CODE
Sections:
19.30.010 Adoption of California Electrical Code.
19.30.020 Title.
19.30.030 Administrative provisions.
19.30.040 Amendments to the California Electrical Code
19.30.010 Adoption of California Electrical Code.
The California Electrical Code, 2025 Edition, as adopted by the California Code of Regulations, Title 24, Part 3 is hereby adopted and made a part of this Chapter as though fully set forth herein subject to the modifications thereto which are set forth in this Chapter.
A copy of this Code is on file for use and examination by the public in the office of the City Clerk of the City of Berkeley.
19.30.020 Title.
This Code shall be known as the "Berkeley Electrical Code" and may be cited as "this Code".
19.30.030 Administrative provisions.
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any administrative provisions contained in Article 89 General Code Provisions that may conflict.
19.30.040 Amendments to the California Electrical Code
Chapter 3 of the 2025 California Electrical Code is adopted in its entirety subject to the modifications thereto which are set forth below:
303.3(C) Conductors of Different Systems.
(1) 1000 Volts, Nominal, or Less. Conductors of ac and dc circuits, rated 1000 volts, nominal, or less, from separately derived systems, from separate services, or from separate utility meters shall not be permitted to occupy the same equipment wiring enclosure, cable, or raceway with conductors from other systems, services, or meters.
All conductors shall have an insulation rating equal to at least the maximum circuit voltage applied to any conductor within the enclosure, cable, or raceway.
Secondary wiring to electric-discharge lamps of 1000 volts or less, if insulated for the secondary voltage involved, shall be permitted to occupy the same luminaire, sign, or outline lighting enclosure as the branch-circuit conductors.
Section 4. That Berkeley Municipal Code Chapter 19.32 is hereby repealed and reenacted to read as follows:
Chapter 19.32
BERKELEY MECHANICAL CODE
Sections:
19.32.010 Adoption of the California Mechanical Code.
19.32.020 Title.
19.32.030 Administrative provisions.
19.32.040 Amendments to the California Mechanical Code
19.32.010 Adoption of the California Mechanical Code.
The California Mechanical Code, 2025 Edition, as adopted in Title 24 Part 4 of the California Code of Regulations, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. A copy of this Code is on file for use and examination by the public in the office of the City Clerk of the City of Berkeley.
19.32.020 Title.
This Code shall be known as the “Berkeley Mechanical Code” and may be cited as "this Code".
19.32.030 Administrative provisions.
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any California Mechanical Code administrative provisions that may conflict.
19.32.040 Amendments to the California Mechanical Code
Chapter 4 of the 2025 California Mechanical Code is adopted in its entirety subject to the modifications thereto which are set forth below:
405.4.1 Exhaust Rate. For intermittent-controlled operations, the exhaust rate shall be not less than 100 ft3/min (47.2 L/s) for range hoods or 300 ft3/min (142 L/s) for mechanical exhaust fans and shall be rated for sound at a maximum of 3 sone at greater than or equal to 100 ft3/min (47.2 L/s), including downdraft appliances. For continuous operated ventilation, the exhaust rate shall be not less than 50 ft3/min (23.6 L/s) and shall be rated for sound at a maximum of 1.0 sone.
Exception: A vented range hood shall not be required in dwelling unit kitchens equipped with a local mechanical exhaust system installed in accordance with ASHRAE
62.2. Section 5. That Berkeley Municipal Code Chapter 19.34 is hereby repealed and reenacted to read as follows:
Chapter 19.34
BERKELEY PLUMBING CODE
Sections:
19.34.010 Adoption of the California Plumbing Code.
19.34.020 Title.
19.34.030 Administrative provisions.
19.34.040 Gas Shut-Off Valves
19.34.010 Adoption of the California Plumbing Code.
The California Plumbing Code, 2025 Edition, as adopted in Title 24 Part 5 of the California Code of Regulations, including Appendices A, B and D, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. A copy of this Code is on file for use and examination by the public in the office of the City Clerk of the City of Berkeley.
19.34.020 Title.
This Code shall be known as the “Berkeley Plumbing Code” and may be cited as "this Code."
19.34.030 Administrative Provisions.
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any California Plumbing Code administrative provisions that may conflict.
19.34.040 Gas Shut-Off Valves
Chapter 12 of the 2025 California Plumbing Code is adopted in its entirety subject to the modifications thereto which are set forth below.
1209.0 Excess Flow Valve Automatic Gas Shut-Off Valves. 1209.2 General Requirements for Automatic Gas Shut-Off Valves. Automatic gas shut-off valves shall:
1. Comply with all applicable requirements of the Berkeley Plumbing Code.
2. Be tested and listed by recognized testing agencies such as the Independent Laboratory of the International Approval Services (IAS), Underwriter's Laboratory (UL), International Association of Plumbing and Mechanical Officials (IAPMO) or any other agency approved by the State of California Office of the State Architect (OSA).
3. Be installed on downstream side of the gas utility meter.
4. Be installed in accordance with the manufacturer's instructions.
5. Provide a method for expedient and safe gas shut-off in an emergency.
6. Provide a capability for ease of consumer or owner resetting in a safe manner. 1209.3 Definitions
For the purpose of this Section, terms shall be defined as follows:
AUTOMATIC GAS SHUT- OFF VALVE shall mean either a motion activated gas shut- off valve or device or an excess flow gas shut-off valve or device.
DOWNSTREAM OF GAS UTILITY METER shall mean all gas piping on the property owner’s side of the gas meter and after the service tee.
MOTION ACTIVATED GAS SHUT OFF VALVE shall mean an approved gas valve activated by motion. Valves are set to activate in the event of a moderate or strong seismic event greater than 5.0 on the Richter scale.
UPSTREAM OF GAS UTILITY METER shall mean all gas piping installed by the utility up to and including the meter and the utility’s service tee. 1209.4 Motion Activated Gas Shut-off Valve, Required. A listed motion activated gas shut-off valve shall be installed as follows:
1209.4.1 New Construction. In any newly constructed building or structure containing fuel gas piping.
1209.4.2 Existing Buildings with a single meter. In any existing building or structure containing fuel gas piping served by a single gas meter, when any addition, alteration or repair is made for which a mechanical or plumbing permit is issued. 1209.4.3 Existing Buildings with separate meters serving individual units or tenant spaces. In any existing building or structure containing fuel gas piping served by multiple gas meters, when any addition, alteration or repair is made to an individual unit or tenant space for which a mechanical or plumbing permit is issued. The
requirement for a motion activated gas shut off valve shall apply to the gas meter serving the individual unit or tenant space and the gas meter serving common area(s).
Exceptions:
1. Existing automatic gas shut-off valves installed prior to the effective date of this Section, provided the valves are maintained in operational condition.
2. Automatic gas shut-off valves installed on a gas distribution system owned or operated by a public utility.
Note: For the purpose of the requirements of this Section, excess flow valves are not permitted to be installed as a substitute for motion activated gas shut-off valves. 1209.5 Mounting. Motion activated seismic gas shut-off valves shall be mounted rigidly to the building or structure containing the fuel gas piping, unless otherwise specified in the manufacturer’s installation instructions.
Section 6. That Berkeley Municipal Code Chapter 19.36 is hereby repealed and reenacted to read as follows:
Chapter 19.36
BERKELEY ENERGY CODE
Sections:
19.36.010 Adoption of the California Energy Code.
19.36.020 Title.
19.36.030 Administrative provisions.
19.36.040 Amendments to the California Energy Code.
19.36.010 Adoption of the California Energy Code.
The California Energy Code, 2025 Edition, as adopted in Title 24 Part 6 of the California Code of Regulations, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. A copy of this Code is on file for use and examination by the public in the office of the City Clerk of the City of Berkeley.
19.36.020 Title.
This Code shall be known as the “Berkeley Energy Code” and may be cited as "this Code”.
19.36.030 Administrative provisions.
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any California Energy Code administrative provisions that may conflict.
Section 7. That Berkeley Municipal Code Chapter 19.37 is hereby repealed and reenacted to read as follows:
Chapter 19.37
BERKELEY GREEN CODE
Sections:
19.37.010 Adoption of the California Green Building Standards Code.
19.37.020 Title.
19.37.030 Administrative provisions.
19.37.040 Amendments to the California Green Building Standards Code.
19.37.010 Adoption of the California Green Building Standards Code.
The California Green Building Standards Code (CALGreen), 2025 Edition, as adopted in Title 24 Part 11 of the California Code of Regulations, is hereby adopted and made a part of this Chapter as though fully set forth herein, subject to the modifications thereto which are set forth in this Chapter. A copy of this Code is on file for use and examination by the public in the office of the City Clerk of the City of Berkeley.
19.37.020 Title.
This Code shall be known as the “Berkeley Green Code” and may be cited as "this Code".
19.37.030 Administrative provisions.
All of the administrative provisions contained in Article 1 of Chapter 19.28, the Berkeley Building Code, shall apply to this Code as well and take precedence over any California Green Building Standards Code administrative provisions that may conflict.
19.37.040 Amendments to the California Green Building Standards Code.
Chapter 3 Green Building of the California Green Building Standards Code is adopted in its entirety subject to the modifications thereto which are set forth below:
301.1.2 Residential waste diversion. The requirements of Section 4.408 shall be required for:
1. Any additions or alterations, which increase the building’s conditioned area, volume or size
2. Any building alterations with a permit valuation over $100,000
3. Any interior or exterior demolitions valued over $3,000
301.3.2 Nonresidential waste diversion. The requirements of Section 5.408 shall be required for additions and, alterations and demolitions whenever a permit is required for work.
Chapter 4 Residential Mandatory Measures of the California Green Buildings Code is adopted in its entirety subject to the modifications thereto which are set forth below:
4.106.4.1 New one- and two-family dwellings and townhouses with attached or detached private garages, carports, or any other on-site parking. For each dwelling unit, install a listed raceway to accommodate a dedicated 208/240-volt branch circuit. The raceway shall not be less than trade size 1 (nominal 1-inch inside diameter).
The raceway shall originate at the main service or subpanel and shall terminate into a listed cabinet, box or other enclosure in close proximity to the proposed location of an EV charger. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere 208/240-volt minimum dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overcurrent protective device minimum 40-ampere 208/240-volt dedicated EV branch circuit in close proximity to the proposed location of an EV charger at the time of original construction in accordance with the California Electrical Code.
Exception: A raceway is not required if a minimum 40-ampere 208/240-volt dedicated EV branch circuit is installed in close proximity to the proposed location of an EV charger at the time of original construction in accordance with the California Electrical Code.
4.106.4.1.1 Identification. The service panel or subpanel circuit directory shall identify the overcurrent protective device space(s) reserved for future EV charging as “EV CAPABLEREADY”. The raceway termination location shall be permanently and visibly marked as “EV CAPABLEREADY”.
4.106.4.2.2 Multifamily dwellings.
1. EV ready parking spaces with receptacles.
a. Multifamily parking facilities with assigned parking. Where dwelling units are provided with assigned parking spaces equal to or greater than the number of dwelling units, at least one low power Level 2 EV charging receptacle shall be provided at an assigned parking space for each dwelling unit.
1. Where the total number of dwelling units exceeds the number of assigned parking spaces, all assigned parking spaces shall be provided with one low power Level 2 EV
charging receptacle.
Exception: Areas of parking facilities served by parking lifts, including but not limited to, automated mechani cal-access open parking garages as defined in the California Building Code; or
parking facilities otherwise incapable of supporting electric vehicle charging. Areas of parking facilities served by parking lifts, provided the required percentage of EV Charger spaces are installed elsewhere.
b. Multifamily parking facilities with unassigned parking. Where dwelling units are provided with unassigned parking spaces equal to or greater than the number of dwelling units, at least one low power Level 2 EV charging receptacle shall be provided at an unassigned parking space for each dwelling unit.
1. Where the total number of dwelling units exceeds the number of unassigned parking spaces, all unassigned
parking spaces shall be provided with one low power
Level 2 EV charging receptacle.
Exception: Areas of parking facilities served by parking lifts, including but not limited to, automated mechani cal-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. Areas of parking facilities served by parking lifts, provided the required percentage of EV Charger spaces are installed elsewhere.
c. Multifamily parking facilities with assigned and unassigned parking. Where multifamily buildings are
provided with both
assigned and unassigned parking spaces equal to or greater than the number of dwelling units, at least one low power Level 2 EV charging receptacle shall be provided for each dwelling unit at either the assigned or unassigned parking space, but not both.
d. Receptacle power source. EV charging receptacles in multifamily parking facilities at assigned parking spaces shall be provided with a dedicated branch circuit connected to the dwelling unit’s electrical panel, unless determined as infeasible by the project builder or designer and subject to concurrence of the local enforcing agency.
Exception: Areas of parking facilities served by parking lifts, including but not limited to, automated mechani cal-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. Areas of parking facilities served by parking lifts, provided the required percentage of EV Chargers spaces are installed elsewhere.
e. Receptacle configurations. 208/240V EV charging receptacles shall
comply with one of the following configurations:
1. For 20-ampere receptacles, NEMA 6-20R
2. For 30-ampere receptacles, NEMA 14-30R
3. For 50-ampere receptacles, NEMA 14-50R
4.106.4.2.6 Hotels and motels.
1. EV ready parking spaces with receptacles.
a. Hotels and motels. Forty (40) percent of the total number of parking spaces shall be equipped with low power Level 2 EV charging receptacles.
Exception: Areas of parking facilities served by parking lifts, including but not limited to, automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging.
Areas of parking facilities served by parking lifts, provided the required percentage of EV Charger spaces are installed elsewhere. b. Receptacle configurations. 208/240V EV charging receptacles shall comply with one of the following configurations:
1. For 20- ampere receptacles, NEMA 6-20R
2. For 30- ampere receptacles, NEMA 14-30R
3. For 50- ampere receptacles, NEMA 14-50R
2. EV Ready parking spaces with EV chargers.
a. Hotels and motels. Twenty-five (25) percent of the total number of parking spaces shall be equipped with Level 2 EV chargers.
b. EV charger connectors. EV chargers shall be equipped with J1772 or J3400 connectors.
Exception: Areas of parking facilities served by parking lifts, including but not limited to, automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. Areas of parking facilities served by parking lifts, provided the required percentage of EV Charger spaces are installed elsewhere.
c. An automatic load management system (ALMS) may be used to reduce the maximum required electrical capacity to each space served by the ALMS.
The electrical system and any on-site distribution transformers shall have sufficient capacity to deliver at least 3.3 kW simultaneously to each EV charging station (EVCS) served by the ALMS. The branch circuit shall have a minimum capacity of 40 amperes, and installed EV chargers shall have a capacity of not less than 30 amperes.
SECTION 4.405—MATERIAL SOURCES (RESERVED)
4.405.1 Reduction in cement use. As allowed by the enforcing agency, cement used in concrete mix design shall be reduced not less than 25 percent. Products commonly used to replace cement in concrete mix designs include, but are not limited to:
1. Fly ash
2. Slag
3. Silica fume
4. Rice hull ash
Exception: Minimum cement reductions in concrete mix designs approved by the Engineer of Record may be lower where high early strength is needed for concrete products or to meet an accelerated project schedule.
4.408.1 Construction waste management. Recycle and/or salvage for reuse 100% of excavated soil and land-clearing debris, 100% of concrete, 100% of asphalt, and a minimum of 65 percent of the nonhazardous construction and demolition waste in accordance with either Section 4.408.2, 4.408.3 or 4.408.4, or meet a more stringent local construction and demolition waste management ordinance.
Exceptions:
1. Excavated soil and land-clearing debris. (Reserved)
2. Alternate waste reduction methods developed by working with local agencies if diversion or recycle facilities capable of compliance with this item do not exist or are not located reasonably close to the jobsite.
3. The enforcing agency may make exceptions to the requirements of this section when isolated jobsites are located in areas beyond the haul boundaries of the diversion facility.
Chapter 5 Nonresidential Mandatory Measures of the California Green Buildings Code with Mid-Cycle Supplement is adopted in its entirety subject to the modifications thereto which are set forth below:
5.106.5.3 Electric vehicle (EV) charging. [N] [BSC-CG] Construction to provide electric vehicle infrastructure and facilitate electric vehicle charging shall comply with Section 5.106.5.3.1 EV capable spaces, Section 5.106.5.3.2 Electric vehicle charging stations and associated Table 5.106.5.3.1, or Section 5.106.5.3.6 Electric vehicle charging stations (EVCS)-Power allocation method and associated Table
5.106.5.3.6, and shall be provided in accordance with regulations in the California Building Code and the California Electrical Code.
Exceptions:
1. On a case-by-case basis where the local enforcing agency has determined compliance with this section is not feasible based upon one of the following conditions:
a. Where there is no local utility power supply.
b. Where the local utility is unable to supply adequate power. c. Where there is evidence suitable to the local enforcement agency substantiating that additional local utility infrastructure design requirements, directly related to the implementation of Section 5.106.5.3, may adversely impact the construction cost of the project.
2. Areas of parking facilities served by parking lifts, including but not limited to, automated mechanical-access open parking garages as defined in the California Building Code; or parking facilities otherwise incapable of supporting electric vehicle charging. Areas of parking facilities served by parking lifts, provided the required percentage of EV Charger spaces are installed elsewhere.
5.106.5.3.1 EV Capable Spaces. [N] Twenty (20) percent of the total number of parking spaces shall be EV capable spaces. Calculation for EV capable spaces shall be rounded up to the nearest whole number. shall be provided in accordance with Table 5.106.5.3.1 and The spaces shall comply with the following requirements:
1. Raceways complying with the California Electrical Code and no less than 1-inch (25 mm) diameter shall be provided and shall originate at a service panel or a subpanel(s) serving the area, and shall terminate in close proximity to the proposed location of the EV capable space and into a suitable listed cabinet, box, enclosure or equivalent. A common raceway may be used to serve multiple EV capable spaces.
2. A service panel or subpanel(s) shall be provided with panel space and electrical load capacity for a dedicated 208/240 volt, 40-ampere minimum branch circuit for each EV capable space, with delivery of 30-ampere minimum to an installed EVSE at each EVCS.
3. The electrical system and any on-site distribution transformers shall have sufficient capacity to supply full rated amperage at each EV capable space.
4. The service panel or subpanel circuit directory shall identify the reserved overcurrent protective device space(s) as “EV CAPABLE”. The raceway termination location shall be permanently and visibly marked as “EV CAPABLE.” Note: A parking space served by electric vehicle supply equipment or designed as a future EV charging space shall count as at least one standard automobile parking space only for the purpose of complying with any applicable minimum parking space requirements established by an enforcement agency. See Vehicle Code Section 22511.2 for further details.
TABLE 5.106.5.3.1—EV CAPABLE SPACES AND EVCS
TOTAL NUMBER OF
ACTUAL
PARKING SPACES
NUMBER OF
REQUIRED EV
CAPABLE SPACES
OTHER THAN OFFICE
AND
RETAIL
OFFICE AND RETAIL
NUMBER OF REQUIRED
EVCS 2, 3
NUMBER OF REQUIRED
EVCS2, 3
1-9 0 0 0
10-25 4 2 3
26-50 8 4 6
51-75 13 6 8
76-100 17 8 13
101-150 25 12 19
151-200 35 18 26
201 and over 20 percent of actual
parking spaces1
50 percent of EV capable
spaces1
75 percent of EV capable
spaces1
1. Calculation for spaces shall be rounded up to the nearest whole number.
2. Each EVCS shall reduce the number of required EV capable spaces by the same number.
3. At least one Level 2 EVSE shall be provided.
5.106.5.3.2 Electric vehicle charging stations (EVCS). Separate and in addition to the requirements of Section 5.106.5.3.1, fifteen (15) percent of the total number of parking spaces of Office and Retail Occupancies and ten (10) percent of the total number of parking spaces for all other nonresidential occupancies shall be EV capable spaces shall be provided with electric vehicle supply equipment (EVSE) to create EVCS in the number indicated in Table 5.106.5.3.1. Calculation of required EVCS shall be rounded up to the nearest whole number. The EVCS required by Table 5.106.5.3.1 by this section shall be provided with Level 2 EVSE or DCFC as permitted in Section 5.106.5.3.2.3. At least one minimum 6.6 kVA Level 2 EVSE shall be provided.
One EV charger with multiple connectors capable of charging multiple EVs simultaneously shall be permitted if the electrical load capacity required by Section
5.106.5.3.1 for each EV capable space is accumulatively supplied to the EV charger.
5.106.5.3.2.1 Receptacle configurations. 208/240V EV charging receptacles shall comply with one of the following configurations:
1. For 20-ampere receptacles, NEMA 6-20R
2. For 30-ampere receptacles, NEMA 14-30R
3. For 50-ampere receptacles, NEMA 14-50R
5.106.5.3.2.2 EV charger connectors. EV chargers shall be equipped with SAE J1772 with a maximum output 240 Volts AC or SAE J3400 connectors.
When using level 2 SAE J3400 SAE connectors, supplied by a 480 V 3-phase service, at least 20 percent of the EV charger connectors shall be SAE J1772 with a maximum output 240 Volts AC.
5.106.5.3.2.3 The installation of each DCFC EVSE shall be permitted to reduce the minimum number of required EV capable spaces without EVSE or EVCS with Level 2 EVSE by five, and reduce proportionally the required electrical load capacity to the service panel or subpanel.
5.106.5.3.2.4 The installation of two low power Level 2 EV charging receptacles shall be permitted to reduce the minimum number of required EV capable spaces without EVSE in Table 5.106.5.3.1 required by Section 5.106.3.2.1 by one.
5.106.5.3.2.4.1 Raceway capacity requirements. To allow for future upgrades to the electrical conductors serving low power Level 2 charging receptacles, the listed raceway serving such receptacles shall be sized to allow the installation of a dedicated 208/240-volt 40-ampere branch circuit. Where no raceway is used, the conductors shall be sized to accommodate a 208/240-volt 40-ampere receptacle.
5.106.5.3.6 Electric vehicle charging stations (EVCS) - power allocation method.
The power allocation method, based on occupancy classification, may be used as an alternative to the requirements in Section 5.106.5.3.1, and Section 5.106.5.3.2 and associated Table 5.106.5.3.1. Use Table 5.106.5.3.6 the following factors to determine the total power in kVA required based on the total number of actual parking spaces.
A. Office and Retail Occupancies: The product of the factor of 0.99kVA/parking space times the total number of parking spaces serving Office and/or Retail occupancies determines the total power in kVA for EVSE charging infrastructure required.
B. For occupancies other than Office and Retail occupancies: The product of the factor 0.66 kVA/parking space times the total number of parking spaces determines the power in kVA required for EVSE charging infrastructure required.
Power allocation method shall include the following:
1. Use any kVA combination of EV capable spaces, low power Level 2, Level 2 or DCFC EVSEs.
2. At least one Level 2 EVSE shall be provided.
3. Any remainder power allocation kVA from Section 5.106.3.6 Item (1) shall be converted to one additional low power Level 2 EVSE.
TABLE 5.106.5.3.6-EVCS—POWER ALLOCATION METHOD
TOTAL NUMBER
OF ACTUAL
PARKING SPACES
MINIMUM
TOTAL kVA
@ 6.6 kVA
OTHER THAN OFFICE AND RETAIL
TOTAL kVA REQUIRED IN ANY
COMBINATION OF EV CAPABLE3,4,
LOW POWER LEVEL 2, LEVEL 21, 2,
OR DCFC
OFFICE AND RETAIL
TOTAL kVA REQUIRED IN ANY
COMBINATION OF EV
CAPABLE4, 5,
LOW POWER LEVEL 2, LEVEL
21, 2,
OR DCFC
1-9 0 0 0
10-25 26.4 26.4 26.4
26-50 52.8 52.8 52.8
51-75 85.8 85.8 85.8
76-100 112.2 112.2 112.2
101-150 165 165 165
151-200 231 231 231
201 and over
20 percent if
actual parking
spaces x 6.6
Total required kVA = P × .20 × 6.6
Where P = Parking spaces in facility
Total required kVA = P × .20 ×
6.6 Where P = Parking spaces in
facility
1. Level 2 EVSE @ 6.6 kVA minimum.
2. At least one Level 2 EVSE shall be provided.
3. Maximum allowed kVA to be utilized for EV capable spaces is 75 percent.
4. If EV capable spaces are utilized, they shall meet the requirements of Section 5.106.5.3.1 EV capable spaces.
5. For office and retail buildings the maximum allowed kVA to be utilized for EV capable spaces is 25 percent.
5.106.5.4.1 Existing buildings or parking areas without previously installed EV capable infrastructure [A]. When EV capable infrastructure does not exist at an existing parking facility or building, and the parking facility or building undergoes an addition or alteration listed in Section 5.106.5.4, construction shall include electric vehicle charging in compliance with either Section 5.106.5.3 and associated Table 5.106.5.3.1, or Section
5.106.5.3.6 and associated Table 5.106.5.3.6 for the total number of actual parking spaces being added or altered.
5.106.5.4.2 Existing buildings or parking areas with previously installed EV capable infrastructure [A]. When EV capable infrastructure is available at an existing parking facility or building, and the parking facility or building is undergoing an addition or alteration listed in Section 5.106.5.4, construction shall include electric vehicle charging in compliance with either Section 5.106.5.3 and associated Table 5.106.5.3.1, or Section
5.106.5.3.6 and associated Table 5.106.5.3.6. Install EVCS at all existing EV capable spaces, utilizing the existing allocated power and infrastructure for the total number of actual parking spaces being added or altered, prior to adding any new EV capable spaces. If the area being added or altered exceeds the existing EV capable capacity, allocated power and infrastructure, provide additional EV charging as needed to comply with this section.
SECTION 5.405—MATERIAL SOURCES (RESERVED)
5.405.1 Reduction in cement use. As allowed by the enforcing agency, cement used in concrete mix design shall be reduced not less than 25 percent. Products commonly used to replace cement in concrete mix designs include, but are not limited to:
1. Fly ash.
2. Slag.
3. Silica fume.
4. Rice hull ash.
Exception: Minimum cement reductions in concrete mix designs approved by the Engineer of Record may be lower where high early strength is needed for concrete products or to meet an accelerated project schedule.
5.408.3 Concrete, asphalt, excavated soil and land clearing debris. 100 percent of concrete, asphalt, trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. For a phased project, such material may be stockpiled on site until the storage site is developed.
Exception: Reuse, either on-or off-site, of vegetation or soil contaminated by disease or pest infestation.
Notes:
1. If contamination by disease or pest infestation is suspected, contact the County Agricultural Commissioner and follow its direction for recycling or disposal of the material. (www.cdfa.ca.gov/)
2. For a map of known pest and/or disease quarantine zones, consult with the California Department of Food and Agriculture. (www.cdfa.ca.gov) Section 8. Copies of this Ordinance shall be posted for two days prior to adoption in the display case located near the walkway in front of Council Chambers, 2134 Martin Luther King Jr. Way. Within 15 days of adoption, copies of this Ordinance shall be filed at each branch of the Berkeley Public Library and the title shall be published in a newspaper of general circulation.
* * * * * *
Attachment 2
RESOLUTION NO. ##,###-N.S.
ADOPTING FINDINGS AS TO LOCAL CLIMATIC, GEOLOGICAL, AND
TOPOGRAPHICAL CONDITIONS RENDERING REASONABLY NECESSARY
ENUMERATED LOCAL BUILDING STANDARDS THAT ARE MORE STRINGENT
THAN THOSE MANDATED BY THE CALIFORNIA BUILDING STANDARDS CODE WHEREAS, the City is proposing to readopt various enumerated changes and modifications to the 2025 California Building Standards Code, California Code of Regulations, Title 24, as set forth below; and
WHEREAS, Health & Safety Code §17958(a) allows the City to make modifications or changes to the California Building Standards Code and other regulations adopted pursuant to Health & Safety Code §17921(a) which result in more stringent local requirements where those modifications or changes are substantially equivalent to changes or modifications that were previously filed by the City and were in effect as of September 30, 2025; and
WHEREAS, all the proposed changes and modifications to the 2025 California Building Standards Code were in effect as of September 30, 2025, except for certain minor technical changes proposed here for clarity and consistency; and WHEREAS, Health & Safety Code §§17958,17958.5 and17958.7 require that such changes be supported by findings made by the governing body that such more stringent local requirements are necessary because of "local climatic, geological, or topographical conditions"; and
WHEREAS, such findings must be made available as a public record and a copy thereof with each such modification or change shall be filed with the California Building Standards Commission; and
WHEREAS, on May 7, 2024, the Berkeley City Council adopted Resolution No. 71,320- N.S. making findings in support of previous local code amendments.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that it finds that each of the proposed changes or modifications to the California Building Standards Code which are enumerated below are reasonably necessary because of local conditions in the area encompassed by the City of Berkeley, as set forth below:
A. LOCAL CONDITIONS
1. Climatic Conditions
a. Discussion
2 The City of Berkeley is located at the geographic center of the Bay Area. The western limits are defined by the Bay at near sea level and the eastern limits by the abruptly rising Berkeley Hills to 1,200 feet. The eastern limit faces open parklands and open space (covered with vegetative fuel loading) to the east and is exposed to a unique danger from wild land fires during periods of hot, dry weather in the summer months.
Many of the Berkeley homes in this area have wood shake and shingle roofs and are
surrounded by brush type vegetation. The situation is made even worse by the negative effects of high wind conditions during the fire season. During May to October, critical climatic fire conditions occur where the temperature is greater than 80°F, the wind speed is greater than 15 mph, fuel moisture is less than or equal to 10.0 percent, wind
direction is from north to the east-southeast and the ignition component is 65 or greater. These conditions occur more frequently during the fire season but this does not preclude the possibility that a serious fire could occur during other months of the year.
The critical climate fire conditions create a situation conducive to rapidly moving, high intensity fires. Fires starting in the wild land areas along the easterly border are likely to
move rapidly westward into Berkeley's urban areas.
In September 1923, critical climatic fire conditions were in effect and Berkeley sustained one of the most devastating fires in California's history. A fire swept over the range of the hills to the northeast of Berkeley and within two hours was attacking houses within the City limits. A total of 130 acres of built-up territory burned. 584 Berkeley buildings were wholly destroyed and about 30 others seriously damaged. By far the greater portion were single-family dwellings, but among the number were 63 apartments, 13 fraternity, sorority and students' house clubs and 6 hotels and boarding houses.
In December of 1980, during critical climatic fire conditions, a small fire started at Berkeley's northeast limits and within minutes five homes were totally destroyed by fire.
On October 20, 1991, a disastrous firestorm swept down from the Oakland hills. Within the first few hours, thousands of people were evacuated. Ultimately over 3,000 dwelling units were destroyed, of which more than 70 were in Berkeley. This fire matched the pattern established by the fires of 1923 and 1980. Additionally, the conditions that led to it were the same as the conditions that led to a 1970 fire that destroyed 70 homes in Oakland.
Berkeley frequently experiences cold winter days with accompanying temperature inversions which trap wood smoke near the ground and increase air pollution. These stagnant air days are marked by increased acute respiratory disease, including asthma, and a small but consistent increase in deaths from heart and lung disease. During these periods the usual onshore flow of clean marine air ceases and wood smoke air pollution becomes an area-wide phenomena. Studies by the Bay Area Air Quality Management District suggest that between 20 and 50% of air polluting small particles come from residential wood burning.
In addition, local surface winds frequently transport moisture laden air from the surface of the Bay waters into the City. Larger scale prevailing weather patterns and winds created by the jet stream from the west also transport highly humid air and storms across the
3 Pacific Ocean through the strait between the San Francisco peninsula and the Marin Headlands straddled by Golden Gate Bridge and into the City. The moderating effect of the Bay waters on local temperatures tends to reduce local temperature extremes, even during periods of high inland temperatures. The combination of moist air from adjacent waters and the associated mild temperatures means that it is common for local weather conditions to hover near the dew point. This can result in the formation of fog associated with local and regional marine weather layers, which commonly cover the City for hours or even days at a time with an average morning relative humidity of 82 percent.
Much of Northern California is considered to possess a predominantly Mediterranean climate. At times Berkeley does experience periods of high temperature and/or low humidity particularly between mid-July and mid-October, when the danger of hillside fires is greatest. Throughout the rest of the year, the marine weather environment is characterized by higher humidity and lower overall prevailing temperatures, resulting in a higher overall moisture content in building construction materials and slower drying of building materials and assemblies once wet or humidified.
Scientific evidence has established that natural gas combustion, procurement and transportation produce significant greenhouse gas emissions that contribute to global warming and climate change. Human activities releasing greenhouse gases into the atmosphere cause increases in worldwide average temperature, which contribute to melting of glaciers and thermal expansion of ocean water, drought conditions, increase in vegetative fuel, and length of fire seasons. As a coastal city located on the San Francisco Bay, Berkeley is experiencing the repercussions of climate change due excessive greenhouse gas emissions. Rising sea levels have caused significant coastal erosion and have increased impacts to infrastructure during extreme tides.
Scientific evidence also suggests storms are growing with higher intensity due to climate change and will be followed by an increased frequency of dry periods. By 2100, average temperatures in the San Francisco Bay Area is expected to increase up to 11 o, bringing 6-10 additional heat waves to Berkeley each year. According to historical records, Bay Area sea level has risen 8 inches over the last century and the pace of sea level rise has increased since 2011. While regional variability exists, the median increase for the San Francisco Bay is expected to reach almost 1 ft by 20501 under a low risk model, while 2.7 ft is projected under an extreme risk scenario. Such climate change events are expected to increase the risk of flooding in low-lying areas of Berkeley, while hillside communities face increased risk of wildfires.
b. Summary
Local climatic conditions of periods of limited rainfall, high temperature and/or low humidity particularly between mid-July and mid-October, and high winds along with existing building construction create periodic extremely hazardous fire conditions that 1 Griggs, G., Cayan, D., Tebaldi, C., Fricker, H., & Árvai, J. (2017). Rising Seas in California. California Ocean Science Trust, (April), 71. Retrieved from http://www.opc.ca.gov/webmaster/ftp/pdf/docs/rising- seas-in-california-an-update-on-sea-level-rise-science.pdf
4 adversely affect the acceleration intensity and size of fires in the City. The same climatic conditions may result in the concurrent occurrence of one or more fires, which may spread in the more populated areas of the City without adequate fire department personnel to protect against and control such a situation. Throughout the rest of the year, the marine weather environment is characterized by higher humidity and lower overall prevailing temperatures, resulting in a higher overall moisture content in building construction materials and slower drying of building materials and assemblies once wet or humidified.
Berkeley is susceptible to the impacts of climate change, including sea level rise, increased average temperatures, and reduced air quality.
2. Geological Conditions
a. Discussion
The City of Berkeley is in a region of high seismic activity and is traversed by the
Hayward fault. It has the San Andreas earthquake fault to the west and the Calaveras earthquake fault to the east. All three faults are known to be active as evidenced by the damaging earthquakes they have produced in the last 100 years and can, therefore, be
expected to do the same in the future. Of primary concern to Berkeley is the Hayward Fault, which has been estimated to be capable of earthquakes exceeding a magnitude of 7.0 on the Richter scale. It extends through many residential areas and passes through a small business district and the University of California. A large number of
underground utilities cross the fault, including major water supply and natural gas lines. Intensified damage during an earthquake may be expected in liquefaction zones along the Bay west of Interstate 80 and in known slide areas, as well as hillside areas (occupied mainly by dwellings) located within or near the fault zone; some areas are steep and have been subjected to slides.
The waterfront areas and areas in the Berkeley flatlands immediately adjacent to creeks and water streams present a major potential for soil liquefaction hazard. The
Eastshore Freeway may liquefy and fail under heavy shaking or it may be inundated by a tsunami. The north hill area is most susceptible to landslides because of the presence of soft and unconsolidated sediments, extensive water content in the ground and the steepness of slopes.
Great potential damage can be related to the likely collapse of freeway overpasses.
In the event of a major earthquake, Berkeley's firefighting capability could be significantly affected by loss of its main water supply. There is also the strong possibility of inundation due to failure of water reservoirs in the hill area. Summit Reservoir at the Kensington border in Berkeley and Berryman Reservoir North have recently been replaced by steel tanks. Berryman Reservoir South has received a seismic upgrade.
Additional potential situations following an earthquake include broken natural gas mains and ensuing fire in the streets, building fires, as the result of broken service connections, the need for rescues for collapsed structures, and the rendering of first aid
and other medical attention to a large number of people.
5 b. Summary
Local geological conditions include high seismic activity and large concentrations of residential type buildings as well as a major freeway. Since the City of Berkeley is located in a densely populated area having buildings and structures constructed over and near a vast array of fault systems capable of producing major earthquakes, the modifications cited herein are intended to better limit property damage as a result of a seismic activity and to establish criteria for repair of damaged properties following a local emergency.
3. Topographical Conditions
a. Discussion
The City of Berkeley has many homes built throughout the urban portion of the Berkeley Hills that are reached by narrow and often winding paved streets which hamper access for fire apparatus and escape routes for residents. In addition, many of the hillside homes are on the extreme eastern edge of the City and require longer response times for the total required firefighting force. Panoramic Way and other hill areas with narrow and winding streets may face the problem of isolation from the rest of
the City.
In the areas north and south of the University of California, there are large concentrations of apartments, rooming houses, and fraternity and sorority houses. A number of apartments in these areas are of wood frame construction and are up to five stories in height from grade level. The fire potential is moderately high due to building congestion, heights, and wood shingle roof coverings and siding. Fires can be expected
to involve large groups of buildings in these areas. It is noted that Berkeley most probably has more physically impaired people per capita than any other community in
the United States. It is estimated that 14% of the approximate population of 124,321 per the 2021 Census in Berkeley are physically impaired. Emergency egress and rescue for these people are more difficult during a fire or other life safety emergency.
The Eastshore Freeway, running along the western edge of Berkeley, is one of the most heavily used and congested freeway sections in the state. Noted impacts have included increased rates of asthma, particularly among children. The proximity of Berkeley to this freeway and its location downwind from prevailing patterns negatively affects air quality, thus increasing the impact of wood smoke in Berkeley.
Part of the Pacific Coast Range, the Berkeley Hills, define the eastern boundary of the City and form a natural obstruction to the movement of humidified, cooler air out of the San Francisco Bay basin and the City of Berkeley into the dryer adjacent inland valleys and the interior of the State. Although these hills do not form an absolute air barrier, they do play a significant role in the creation of local microclimates. This effect is evidenced by the disparity in temperatures and relative humidity commonly experienced during periods of warm weather between communities adjacent to the San Francisco Bay / Pacific Ocean and communities in the Bay Area inland valleys only a few miles inland.
6 The City of Berkeley is part of a densely populated metropolitan area with limited space for landfills. It is important to preserve the limited landfill space for materials which cannot be diverted and to keep land-clearing debris out of landfills, where decomposition of such organic material would result in methane.
b. Summary
Local topographical conditions include hillside housing with many narrow and winding streets with slide potential for blockage in the abruptly rising Berkeley hills.
These
conditions create an extremely serious problem for the Fire Department when a major fire or earthquake occurs. Many situations will result in limiting or total blockage of fire department emergency vehicular traffic, overtaxed fire department personnel and a total lack of resources for the suppression of fire in buildings and structures in the City of Berkeley. In addition, under these local conditions, the presence of wood smoke can cause increased disease, including asthma, and increased deaths from heart and lung disease. The built environment also provides little space for landfills.
B. REASONABLE NECESSITY
The proposed changes and modifications to the California Building Standards Code are reasonably necessary due to the local conditions set forth above because they reduce
the risks to life, public safety, health, welfare and property which result from the City’s changing climate and location astride an active earthquake fault. They are further justified for the reasons set forth below.
In adopting the California Building Standards Code as the Berkeley Building Codes, the City proposes to make certain substantive modifications whose effect is to impose more stringent requirements locally than are mandated by the California Building Standards Code. These are:
( 1 ) Building standards relating to increased fire resistance (Berkeley Building Code Chapter 19.28 Article 2);
(2) Standards to reduce the health risk caused by wood smoke under the climatic conditions of Berkeley (Berkeley Building Code Chapter 19.28 Article 3);
(3) Building standards for retrofit of certain existing building types with seismic weaknesses (Berkeley Building Code Chapter 19.28 Article 5); (4) Standards for repair of existing buildings (Berkeley Building Code Chapter
19.28, Article 6);
(5) Provisions requiring retrofitting of unreinforced masonry buildings (Berkeley Building Code Chapter 19.28 Article 6 and Berkeley Municipal Code Chapter
19.38);
(6) Provisions requiring retrofitting of soft, weak, or open front buildings (Berkeley Building Code Chapter 19.28 Article 6 and Berkeley Municipal Code Chapter
19.39);
7 (7) Various technical amendments to structural standards (Berkeley Building Code Chapter 19.28 Article 7, Berkeley Residential Code Chapter 19.29 Section 19.29.060);
(8) Building standards for construction of exterior elevated elements (E3) to resist moisture intrusion (Berkeley Building Code Chapter 19.28 Article 8); (9) Building standards for emergency housing during the declaration of a shelter crisis (Berkeley Building Code Chapter 19.28 Article 9); (10) Provisions requiring conductor separation for conductors of different systems (Berkeley Electrical Code Chapter 19.30 Section 19.30.040); (11) Provisions requiring range hood ventilation with sound ratings in residential dwelling units (Berkeley Mechanical Code Chapter 19.32 Section 19.32.040); (12) Provisions requiring installation of motion activated gas shut-off valves (Berkeley Plumbing Code Chapter 19.34 Section 19.34.040); (13) Provisions increasing and expanding the applicability of construction and demolition waste diversion requirements (Berkeley Green Code Chapter
19.37 Section 19.37.040);
(14) Provisions to reduce the cement content in construction concrete mix designs (Berkeley Green Code Chapter 19.37 Section 19.37.040); and (15) Provisions for increasing electric vehicle charging requirements in new low-rise residential, multifamily, and nonresidential buildings. (Berkeley Green Code Chapter 19.37 Section 19.37.040).
These more stringent local requirements are reasonably necessary to address risks created by local conditions set forth above for
the following reasons:
The fire -resistive construction in the city made pursuant to Chapter 19.28 Article 2 reduce the risk to life and property associated with structure fires in the City. The air pollution modifications made by Chapter 19.28 Article 3 Section
19.28.040, and Chapter 19.32 Section 19.32.040 reduce the risk to public safety created by air pollution throughout the City.
The structural modifications made by Chapter 19.28 Article 5, Article 6, Article 7, Chapter 19.29 Section 19.29.060, Chapter 19.32 Section 19.32.40, Chapter 19.34 Section 19.34.040,
Chapters 19.38 and 19.39 reduce the risk
to life and property and hasten recovery from predictable future natural disasters.
The E3 modifications made by Chapter 19.28, Article 8, reduce the risk to life and property resulting from the effect of the City's climate and topography on exterior building construction features and materials.
The waste diversion modifications made by Chapter 19.37 Section 19.37.040 improve public health, safety and welfare by preserving the limited landfill space for materials which cannot be diverted resulting from the effect of local
8 topography with limited space for landfills, and mitigating the impacts of climate change.
The cement reduction modifications made by Chapter 19.37 Section 19.37.040 support the City’s decarbonization efforts by reducing the embodied emissions associated with the production of concrete, thus mitigating the impacts of climate change.
The EV infrastructure modifications made by Chapter 19.37 Section 19.37.040 support the City’s decarbonization efforts by increasing electric vehicle charging infrastructure in both low-rise residential, multifamily, and nonresidential buildings, thus mitigating the impacts of climate change.
BE IT FURTHER RESOLVED that certain local amendments to the Codes are not more stringent than the provisions of the California Codes but rather cover matters
not addressed by those Codes or are administrative in nature and do not modify building standards pursuant to Health & Safety Code §17958, §17958.5 and §17958.7. These amendments establish administrative regulations for the effective
enforcement of building standards throughout the City of Berkeley as follows:
Chapter 19.28, Article 1 (Administrative provisions and definitions) and Article 4 (Construction in the Right of Way), and Administrative amendments to Chapter 19.29 (California Residential Code), to Chapter 19.30 (California Electrical Code), to Chapter
19.32 (California Mechanical Code), to Chapter 19.34 (California Plumbing Code), to
Chapter 19.36 (California Energy Code) and to Chapter 19.37 (California Green Building Standards Code), which are local amendments to the California Codes affecting
administration provisions only.
BE IT FURTHER RESOLVED that this Resolution shall go into effect on January 1, 2026.
BE IT FURTHER RESOLVED that Resolution No. 71,320-N.S. is hereby rescinded effective January 1, 2026.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: https://berkeleyca.gov/
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jennifer Louis, Chief of Police, Police Department Subject: Authorization to Encrypt Berkeley Police Department Primary Radio Channels
RECOMMENDATION
Adopt a Resolution rescinding the City Council’s existing policy (established in September of 2021) that limits the Police Department’s use of encrypted public safety radio transmissions to Special Response Team operations, special patrol and investigative operations, prolonged critical incidents, execution of search warrants, or transmissions of Criminal Justice Information (CJI) and Personally Identifiable Information (PII) pursuant to California Department of Justice (DOJ) Bulletin 20-09-CJIS and authorize the encryption of all primary Berkeley Police Department (BPD) radio channels.
SUMMARY
This report requests Council approval to rescind the 2021 directive keeping most BPD radio channels unencrypted and to authorize encryption of all primary dispatch channels. The action will align Berkeley with every other Alameda and Contra Costa County agency that will transition to encryption in October 2025, ensure compliance with California DOJ and federal CJIS security requirements, protect community privacy, and address well-documented officer safety and operational integrity concerns.
FISCAL IMPACTS OF RECOMMENDATION
The City has already procured Motorola radios with built-in encryption capability. No additional costs are anticipated and, if necessary, any training or administrative costs associated with the transition will be absorbed within the Police Department’s existing operating budget.
CURRENT SITUATION AND ITS EFFECTS
The Berkeley Police Department’s primary and secondary dispatch channels currently remain unencrypted and therefore accessible in real time via scanner applications and internet streaming services. In recent months and over the last several years, BPD officers and detectives have documented multiple incidents where suspects actively monitored unencrypted radio traffic while committing crimes, most often in coordinated
18
Authorization to Encrypt Berkeley Police Department
Primary Radio Channels
CONSENT CALENDAR
October 28, 2025
overnight commercial burglaries involving multiple suspects. Intelligence shared through regional partnerships confirms that this is widespread, organized, and in some cases involves armed offenders.
Local examples include arrests in which suspects were stopped while listening to BPD’s primary channel on a mobile device, recovery of phones from suspects that were actively broadcasting BPD channels, and investigative video showing lookouts using hand-to-ear signals consistent with monitoring radio traffic and alerting accomplices immediately prior to officer arrival. These behaviors demonstrate that suspects use scanner apps and similar tools to evade capture, to organize sideshows and other mass gatherings, and to track officer movements in real time.
The officer safety implications are substantial. When suspects have advance notice of officer presence or activity in an area, it not only enables their evasion of arrest; it can create a tactical disadvantage for responding personnel and increases the risk of a violent encounter. Advance knowledge of officer locations, response times, and tactics allows offenders to avoid detection, to reposition or withdraw, to prepare aggressive responses, or to set up ambushes if a confrontation ensues. The risk is greatest during low-staffing periods (typically overnight hours), when reporting parties and on-scene witnesses are often exposed and fewer officers are available to provide backup. The overall result is reduced operational effectiveness, higher risk of officer injury or death, compromised evidence recovery, increased danger to victims and witnesses, and diminished morale and confidence among public safety personnel.
Utilizing unencrypted radio channels also undermines regional operational and compliance benefits. The East Bay Regional Communications System Authority (EBRCSA) scheduled Contra Costa agencies to encrypt their communications on October 7, 2025, and Alameda County agencies on October 9, 2025. On October 7, Contra Costa agencies completed the encryption of their communications. Due to a need to correct a minor patching issue, the Alameda County agencies encryption is now scheduled for October 15, 2025. However, because the Berkeley Police Department cannot implement encryption without a change to Council policy, any Berkeley transition will occur after the rest of Alameda County. Without Council approval, Berkeley would be the only agency in the two-county system to continue broadcasting primary dispatch traffic unencrypted. That status not only concentrates criminal attention on Berkeley’s open channels but also exposes the City to heightened liability as the City would be choosing not to meet statewide privacy and security expectations at a time when all of the other regional law enforcement partners did so.
This initiative is a Strategic Plan Priority Project, advancing our goal to create a resilient, safe, connected, and prepared city.
Authorization to Encrypt Berkeley Police Department
Primary Radio Channels
CONSENT CALENDAR
October 28, 2025
BACKGROUND
BPD is a member of the East Bay Regional Communications System Authority, a shared radio system designed to provide interoperable communications for police, fire, and other responders across Alameda and Contra Costa Counties. On October 12, 2020, the California Department of Justice issued Information Bulletin 20-09-CJIS, which requires the protection of Criminal Justice Information (CJI) and Personally Identifiable Information (PII) transmitted over radio systems and directs agencies to use encryption consistent with the FBI CJIS Security Policy. Agencies unable to encrypt immediately were directed to adopt restrictive interim workarounds and submit compliance plans with the understanding that full encryption would be implemented over time.
In September 2021, Council considered encryption as part of approving the City’s Motorola radio contract. At that time, the County was not yet prepared to implement systemwide encryption and Council adopted a written policy that, except for Special Response Team operations and transmissions of CJI or PII pursuant to DOJ Bulletin 20-09-CJIS, most public safety radio transmissions remain unencrypted and accessible to the media and public through scanners or similar technology. The City’s Motorola system was procured with encryption capability and the Council’s action recognized encryption would eventually become necessary.
EBRCSA has since finalized a systemwide transition to AES 256-bit encryption for October of this year. Without Council approval to move forward with encryption, Berkeley will be the only agency in either county whose main dispatch radio communications remain publicly accessible in real time.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
There are no identifiable environmental sustainability or climate impacts associated with this action.
RATIONALE FOR RECOMMENDATION
Operating unencrypted radio channels is inconsistent with DOJ directives and exposes individuals, officers, and the City to significant risk. This is due to the operational reality that responding to and investigating calls for service regularly requires transmitting names, dates of birth, driver’s license numbers, warrant information, addresses, or mental health information. As neighboring cities and counties move to protect CJI and PII, Berkeley risks being out of step with privacy standards and regulatory expectations.
More critically, continuing to broadcast sensitive information without encryption creates tangible vulnerabilities that criminals exploit to avoid capture, to harm officers or community members, and to jeopardize ongoing investigations and prosecutions. While interim workarounds such as encrypted secondary channels and mobile data terminals have been used, those measures are operationally inefficient and unsustainable given staffing constraints in sworn and dispatch personnel. Continued reliance on these
Authorization to Encrypt Berkeley Police Department
Primary Radio Channels
CONSENT CALENDAR
October 28, 2025
workarounds increases the likelihood of delayed or incomplete information, reduced situational awareness, and heightened safety risks. To maintain transparency and media access, the Berkeley Fire Department’s radio channels will remain unencrypted, ensuring continued public awareness of major incidents such as fires, collisions, and other critical events that often involve joint police and fire responses. This is possible as the fire channels do not typically include PII or police tactics.
Encrypting BPD’s primary radio channels will protect officer safety and operational integrity by preventing suspects from anticipating or countering police response, and by eliminating the tactical advantage criminals currently gain from open access to dispatch communications. Encryption will safeguard community privacy by ensuring that PII and CJI are not publicly broadcast and will bring Berkeley into compliance with DOJ Bulletin 20-09-CJIS and the FBI CJIS Security Policy. Aligning with the regional transition reduces liability risk for the City and mitigates the incentive for offenders to disproportionately target Berkeley because it remains the last window into real-time police operations in the East Bay.
Full encryption also addresses staffing realities. Because the dedicated encrypted channel cannot always be staffed with allocated resources, BPD has experienced delayed or incomplete communications when relying on alternate channels.
Implementing full encryption will eliminate these inefficiencies and ensure that both officers and dispatchers operate with complete and accurate information in real time, improving safety and mission effectiveness.
Beyond operational and legal benefits, encryption ensures officer safety and proactively reduces preventable risks. At the same time, encryption does not eliminate transparency. BPD will continue and expand its existing public information practices, including publication of crime and use-of-force data on the BPD Transparency Hub, timely notifications to City Council regarding significant incidents, social media updates through established City channels (Twitter/X, Facebook, Instagram, and Nixle), media briefings and access facilitated by the Public Information Officer, and continued access to records through the California Public Records Act.
Given the legal, operational, and public-safety imperatives described above, rescinding the Council’s 2021 policy and authorizing full encryption of primary radio channels in coordination with the EBRCSA transition in October of 2025, is recommended. While an extended period of community engagement and education would have been preferable, the urgency of DOJ compliance and the immediate risks posed by ongoing unencrypted broadcasts justify near-term action. If approved, BPD will implement a public outreach plan during the transition that includes a description of the changes for the public, media notifications, and opportunities for community feedback.
Authorization to Encrypt Berkeley Police Department
Primary Radio Channels
CONSENT CALENDAR
October 28, 2025
ALTERNATIVE ACTIONS CONSIDERED
One alternative is to maintain the current policy and continue using interim workarounds such as encrypted secondary channels and mobile data computers. This approach was rejected because it is operationally inefficient, burdens personnel, does not fully meet DOJ/CJIS expectations, and leaves the City exposed to increased risk. A second alternative is to delay implementation of encryption; this was rejected because it would leave Berkeley as the sole unencrypted agency in the region, concentrate criminal attention on our open channels, and increase potential liability and safety risks.
CONTACT PERSON
Jennifer Louis, Chief of Police, Police Department, (510) 981-5700 Attachments:
1: Resolution
Exhibit A: EBRCSA Memo Regarding Encryption
Exhibit B: 9-28-2021 Supplemental 3 Agenda Material
RESOLUTION NO. ##,###-N.S.
RESCINDING THE CITY COUNCIL’S POLICY REGARDING UNENCRYPTED PUBLIC
SAFETY RADIO CHANNELS AND AUTHORIZING THE ENCRYPTION OF BERKELEY
POLICE DEPARTMENT PRIMARY RADIO CHANNELS
WHEREAS, the California Department of Justice issued Information Bulletin 20-09-CJIS (October 12, 2020) requiring encryption of all Criminal Justice Information (CJI) and Personally Identifiable Information (PII) transmitted over radio systems, consistent with the FBI CJIS Security Policy; and
WHEREAS, in September 2021 the City Council adopted a policy that most City public safety radio transmissions remain unencrypted, except for Special Response Team operations and transmissions of CJI/PII; and
WHEREAS, the Berkeley Police Department has documented numerous incidents in which suspects used unencrypted radio traffic to coordinate crimes, evade capture, and endanger officers and community members; and
WHEREAS, advance notice of officer presence or activity creates a tactical disadvantage and increases the risk of violent confrontation or ambush; and WHEREAS, failure to encrypt would leave Berkeley the only unencrypted agency in Alameda and Contra Costa Counties, creating a unique public safety risk, undermining regional consistency, and exposing the City to liability; and WHEREAS, the East Bay Regional Communications System Authority (EBRCSA) has scheduled encryption for Contra Costa agencies on October 7, 2025, and Alameda County agencies, including Berkeley, on October 15, 2025, which is the earliest date BPD could transition; however, actual implementation will occur as soon as practicable following Council authorization and administrative preparation.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the policy adopted on September 28, 2021, of transmitting unencrypted information on primary channels is hereby rescinded.
BE IT FURTHER RESOLVED that the Council authorizes the City Manager to approve the encryption of all primary Berkeley Police Department radio channels, to be implemented promptly after Council approval and required administrative steps are completed.
East Bay Regional Communications System Authority (EBRCSA) Radio Encryption Transition: Timeline and Frequently Asked Questions (FAQ) Subject: Transition to AES 256-bit Encryption for Radio Communications Effective Dates: September 3 & 4, 2025
The East Bay Regional Communications System Authority (EBRCSA) is transitioning primary radio talk groups to AES 256-bit encryption. This change is being made to comply with state and federal mandates regarding the protection of sensitive information and to enhance safety.
Transition Schedule:
• Alameda County Agencies: September 3, 2025, from 0330 to 0530 hours. • Contra Costa County Agencies: September 4, 2025, from 0330 to 0530 hours.
A final list of affected agencies is found at the end of this memo Operational Support During Transition: A radio technician will be available in the communications center during the transition period to assist with the resetting of radio consoles and to address any questions from staff.
Preparation for Personnel: To ensure a smooth transition, all personnel working during these hours are strongly encouraged to familiarize themselves with the location of the encrypted zones on their radios before September 3 or 4. Simulating the process will help ensure operational readiness.
Frequently Asked Questions (FAQ) for Community and Media Engagement The following information is provided to assist Chiefs and other personnel in responding to inquiries from the public and media.
1. Why are law enforcement agencies moving to radio encryption? This transition is a critical step to ensure compliance with legal and security requirements. Specifically, it addresses:
• State Mandates: The California Department of Justice (DOJ) requires the protection of Criminal Justice Information (CJI) and Personal Identifying Information (PII) during transmission.
• Federal Standards: The Federal Bureau of Investigation (FBI) Criminal Justice Information Services (CJIS) Security Policy mandates encryption for the transmission of sensitive data.
• Officer Safety: Encrypting primary radio channels prevents individuals with malicious intent from monitoring police activities, including tactical information and officer locations, thereby reducing the risk to officers during dynamic situations.
2. The CA DOJ memo requiring the protection of PII and CJI was issued in 2020. Why is this transition happening now? Since the 2020 DOJ memo, many agencies have implemented interim solutions to protect PII and CJI, such as using back-up channels or in- car computers for data exchange. Some agencies also began using encrypted secondary channels for primary traffic. EBRCSA has worked to develop and implement a system-wide encryption solution to ensure consistent and comprehensive compliance for member agencies.
3. How common is radio encryption among other law enforcement agencies in California? While a precise count is not available, it is EBRCSA’s understanding that most law enforcement agencies in California have already transitioned to or utilize encrypted radio channels for their primary communications, including most Bay Area law enforcement agencies.
4. Are there alternatives to encryption for protecting PII and CJI? While other solutions exist, they do not fully meet the rigorous standards set by the DOJ and FBI, are cost prohibitive to continue long-term or could compromise peace officer safety. The DOJ memo explicitly states that “the transmission of such information must be encrypted. ”
5. How will the media and public learn about in-progress events? Each department will manage such communications based on their specific needs, potentially through social media updates and encouraging all media to contact department dispatch or public information officers for official information.
6. Will the EBRCSA issue a press release about this change? No. EBRCSA is only providing the technical infrastructure for the transition. Public communication needs vary significantly among member agencies, so the EBRCSA will defer all media inquiries to the individual departments for comment.
7. How have other agencies handled public and media communications regarding encryption? For examples of how other agencies have managed this process, please review the following resources:
• City of Los Altos: https://www.losaltosca.gov/404/Radio-Encryption • City of Santa Clara Police Department: https://www.santaclaraca.gov/our- city/departments-g-z/police-department/community/news/police-radio-system
Table 1: Alameda County, September 3
Agency Technician Assigned Time Block
ACSO Jethro 0330
Oakland Justice 0330
Livermore Patricia 0330
Piedmont J.J. 0330
San Leandro John 0330
Pleasanton Phil 0400
Alameda Robert 0400
Albany Matt 0400
Emeryville Brandon 0400
UC Berkeley Randy 0400
Berkeley J.J. 0445
Fremont John 0445
Hayward Justice 0445
Newark Patricia 0445
Oakland Housing Authority Jethro 0445
Table 2: Contra Costa County, September 4
Agency Technician Assigned Time Block
Contra Costa SO Robert 0330
Concord Phil 0330
San Ramon Matt 0330
Antioch Jethro 0400
EBRPD John 0400
Pinole J.J. 0400
Richmond Brandon 0400
Brentwood Phil 0400
Martinez Justice 0445
Pleasant Hill Robert 0445
Walnut Creek Matt 0445
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jennifer A. Louis, Chief of Police
Subject: Revenue Grant: California Office of Traffic Safety (OTS) for the 2025-2026 “Selective Traffic Enforcement Program (STEP) Grant
RECOMMENDATION
Adopt a Resolution authorizing the Chief of Police to accept the "Selective Traffic Enforcement Program (STEP)" grant and enter into the resultant grant agreement and any amendments, with the California Office of Traffic Safety. This OTS grant is for $240,000 for the period of October 1, 2025 through September 30, 2026, which is Federal Fiscal Year 2026.
FISCAL IMPACTS OF RECOMMENDATION
The total of this project will not exceed $240,000. Grant revenues will be deposited into budget code 309-71-703-812-0000-000-000-431110 to offset expenditures.
Appropriation of the expenditures is being included in the First Amendment to the Appropriations Ordinance. This grant will fund overtime, benefits, equipment, training costs, and reduce additional General Fund expenditures.
CURRENT SITUATION AND ITS EFFECTS
Securing OTS grant funding is a Strategic Plan Priority Project, advancing our goal to create a resilient, safe, connected, and prepared city.
Currently the Traffic Bureau at the Berkeley Police Department is staffed by two Motor Officers, one Traffic Data Analyst, a Sergeant, and a Lieutenant. Motor officers’ responsibilities include injury-collision investigations and traffic enforcement; however, resources often deplete rapidly due to ancillary duties and personnel shortages in the operations/patrol division. OTS funding builds upon our current traffic safety efforts by allowing patrol and motor officers opportunities to address traffic safety issues-most significantly pedestrian and bicycle safety, distracted and impaired driving- in addition to and outside of their regularly scheduled duties. Additionally, the funds provide opportunities for leadership development and learning in traffic safety and DUI/impaired driving enforcement, and enhance the department's overall mission of public safety.
This grant year’s funding will allow for the purchase of Lidars for speed enforcement,
19
Revenue Grant: Fiscal Years 2025/2026 Alcoholic Beverage Control (ABC) Alcohol Policing Partnership (APP) Grant
CONSENT CALENDAR
October 28, 2025
preliminary alcohol screening devices (PAS) for DUI investigations, and bicycle helmets for juvenile bicycle safety and education.
BACKGROUND
Office of Traffic Safety (OTS) has ranked the City of Berkeley in the top three for the past several years in pedestrian and bicycle related injury collisions when compared to sixty-one other cities with comparable populations. Each year hundreds of people are injured in traffic collisions that occur in the City of Berkeley. Berkeley maintains a high ranking in total fatal and injury collisions, hit and run injury collisions, motorcycle involved collisions, nighttime collisions, and speed related collisions. With assistance from the 2025-2026 Office of Traffic Safety STEP Grant we will continue our efforts to reduce the number of people injured in collisions whether they choose to walk, drive, bike or ride a motorcycle in our city.
In 2021, the City of Berkeley was ranked number 1 (1/60) for collisions involving bicyclists, number 2 (2/60) pedestrians, and 12 (12/61) for pedestrians over 65 years old and. Based on these statistics and OTS rankings, the City of Berkeley is one of the most dangerous cities in the State of California to walk or ride a bicycle.
Between January 1, 2015 and January 1, 2025 there have been twenty-nine fatal collisions in the City of Berkeley. Seventeen of those resulted in a pedestrian being killed, three resulted in a bicyclist being killed, and three involved drugs or alcohol.
In 2024 alone, the Berkeley Police Department (BPD) investigated 4 fatal collisions, an increase from 2023.
The OTS Grant and the City Council’s Vision Zero Program have shared ideologies.
BPD’s participation directly supports two of three of Vision Zero’s tenets. BPD’s efforts directly support Public Awareness Education and Traffic Enforcement. Public Awareness through our social media, departmental messaging, and direct contact with the public (in the field and at community meetings) and data-driven enforcement of primary collision factor offenses in areas where they have the highest probability of occurring.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The City of Berkeley continues to have one of the highest bicycle and pedestrian usage rates in the County of Alameda and, as a result, there are many bicyclists and pedestrians sharing the roadway with motorists. This grant will support the City of Berkeley's efforts to promote more sustainable forms of transportation, reducing greenhouse gas emissions-with the goal of reducing traffic injuries and fatalities related to all modes of transportation.
Revenue Grant: Fiscal Years 2025/2026 Alcoholic Beverage Control (ABC) Alcohol Policing Partnership (APP) Grant
CONSENT CALENDAR
October 28, 2025
RATIONALE FOR RECOMMENDATION
The Police Department requests this funding be approved to enhance our current mission of providing a safer environment for pedestrians, bicyclists, motorcyclists, and motorists on all City of Berkeley roadways and highways.
ALTERNATIVE ACTIONS CONSIDERED
The California Office of Traffic Safety currently provides the only known grant funding specific to traffic enforcement and related education. Not accepting this OTS grant would require additional overtime expenditures from General Fund resources or could result in a decrease in the overall safety of the people of Berkeley
CONTACT PERSON
Lieutenant Rashawn Cummings, Police Traffic Bureau, (510) 981-5983 Attachments:
1: Resolution
RESOLUTION NO. ##,###-N.S.
REVENUE GRANT: SELECTIVE TRAFFIC ENFORCEMENT PROGRAM (STEP)
GRANT FROM THE OFFICE OF TRAFFIC SAFETY TO FUND STRATEGIES TO
REDUCE THE NUMBER OF INJURIES AND DEATHS RELATED TO TRAFFIC
COLLISIONS IN THE CITY OF BERKELEY
WHEREAS, the Police Department is committed to providing a safe and secure environment through law enforcement within the City of Berkeley; and WHEREAS, the Office of Traffic Safety (OTS) has made grant funding available to the Police Department to assist them in their mission of increasing traffic safety; and WHEREAS, this grant will provide funding to support efforts to reduce injury and fatal collisions involving pedestrians, bicyclists, motorcyclists, and motorists on all City of Berkeley roadways and highways; and
WHEREAS, grant revenues will be deposited into budget code 309-71-703-812-0000- 000-000-431110, in the DUI Enforcement Education Program Fund.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the Chief of Police is authorized to accept the Selective Traffic Enforcement Program (STEP) Grant and enter into the resultant grant agreement and any amendments, with the Office of Traffic Safety (OTS) to fund increased levels of impaired or distracted driving enforcement, nighttime seatbelt enforcement, motorcycle safety enforcement, and educational programs regarding bicycle and pedestrian collisions in the amount of $240,000 for the period of October 1, 2025 to September 30, 2026.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jennifer A. Louis, Chief of Police
Subject: Revenue Grant: Cannabis Tax Fund Grant Program (CTFGP) Acceptance
RECOMMENDATION
Adopt a Resolution authorizing the Chief of Police to accept the CTFGP grant and enter into the resultant grant agreement and any amendments, with the California Highway Patrol. This grant is for $101,783.28 for the period of July 1, 2025 through June 30, 2026.
FISCAL IMPACTS OF RECOMMENDATION
The total of this project will not exceed $101,783.28. Grant revenues will be deposited into budget code 336-71-703-812-0000-000-000-432110 to offset expenditures.
Appropriation of the expenditures is being included in the First Amendment to the Appropriations Ordinance. This grant will fund overtime, benefits, training costs, and reduce additional General Fund expenditures.
CURRENT SITUATION AND ITS EFFECTS
Securing CTFGP grant funding is a Strategic Plan Priority Project, advancing our goal to create a resilient, safe, connected, and prepared city.
Currently the Traffic Bureau at the Berkeley Police Department is staffed by two motor officers, one traffic data analyst, a Sergeant, and a Lieutenant. Motor officers’ responsibilities include injury-collision investigations and traffic enforcement; however, resources often deplete rapidly due to ancillary duties and personnel shortages in the operations/patrol division. CTFGP funding builds upon our current traffic safety efforts by allowing patrol and motor officers opportunities to address traffic safety issues-most significantly impaired driving- in addition to and outside of their regularly scheduled duties. Additionally, the funds provide opportunities for leadership development and learning in traffic safety and DUI/impaired driving enforcement, and enhance the department's overall mission of public safety.
BACKGROUND
Office of Traffic Safety (OTS) has ranked the City of Berkeley in the top three for the past several years in pedestrian and bicycle related injury collisions when compared to sixty-one other cities with comparable populations. Each year hundreds of people are
20
Revenue Grant: Cannabis Tax Fund Grant Program Grant
for 2025-2026 CONSENT CALENDAR
October 28, 2025
injured in traffic collisions that occur in the City of Berkeley. Berkeley maintains a high ranking in total fatal and injury collisions, hit and run injury collisions, motorcycle involved collisions, nighttime collisions, and speed related collisions. With assistance from the 2025-2026 CTFGP grant we will continue our efforts to reduce the number of people injured in collisions.
The CTFGP Grant and the City Council’s Vision Zero Program have shared ideologies.
BPD’s participation directly supports two Vision Zero’s tenets. BPD’s efforts directly support Public Awareness Education and Traffic Enforcement. Public Awareness through our social media, departmental messaging, and direct contact with the public (in the field and at community meetings) and data-driven enforcement of primary collision factor offenses in areas where they have the highest probability of occurring.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The City of Berkeley continues to have one of the highest bicycle and pedestrian usage rates in the County of Alameda and, as a result, there are many bicyclists and pedestrians sharing the roadway with motorists. This grant will support the City of Berkeley's efforts to promote more sustainable forms of transportation, reducing greenhouse gas emissions, with the goal of reducing traffic injuries and fatalities related to all modes of transportation.
RATIONALE FOR RECOMMENDATION
The Police Department requests this funding be approved to enhance our current mission of providing a safer environment for pedestrians, bicyclists, motorcyclists, and motorists on all City of Berkeley roadways and highways.
ALTERNATIVE ACTIONS CONSIDERED
The California Highway Patrol currently provides grant funding specific to traffic enforcement and related education. Not accepting this grant funding would require additional overtime expenditures from General Fund resources or could result in a decrease in the overall safety of the citizens of Berkeley
CONTACT PERSON
Lieutenant Rashawn Cummings, Police Traffic Bureau, (510) 981-5983 Attachments:
1: Resolution
Exhibit A: Intent to Award
RESOLUTION NO. ##,###-N.S.
REVENUE GRANT: CANNABIS TAX FUND GRANT PROGRAM GRANT (CTFGP)
FROM THE CALIFORNIA HIGHWAY PATROL TO FUND STRATEGIES TO REDUCE
THE NUMBER OF INJURIES AND DEATHS RELATED TO TRAFFIC COLLISIONS IN
THE CITY OF BERKELEY
WHEREAS, the Police Department is committed to providing a safe and secure environment through law enforcement within the City of Berkeley; and WHEREAS, the California Highway Patrol (CHP) has made grant funding available to the Police Department to assist them in their mission of increasing traffic safety; and WHEREAS, this grant will provide funding to support efforts to reduce injury and fatal collisions involving pedestrians, bicyclists, motorcyclists, and motorists on all City of Berkeley roadways and highways; and
WHEREAS, grant revenues will be deposited into budget code 336-71-703-812-0000- 000-000-432110, in the DUI Enforcement Education Program Fund.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the Chief of Police is authorized to accept the CTFGP Grant and enter into the resultant grant agreement and any amendments, with the CHP to fund increased levels of impaired driving enforcement in the amount of $101,783.28 for the period of July 1, 2025 to June 30, 2026.
State of California-Transportation Agency GAVIN NEWSOM, Governor
DEPARTMENT OF CALIFORNIA HIGHWAY PATROL
Safety, Service, and Security An Internationally Accredited Agency 601 North 7th Street
Sacramento, CA 95811
(916) 843-4360
(800) 735-2929 (TT/TDD)
(800) 735-2922 (Voice)
June 13, 2025
File No.: 060.17344.17369
Commander Rashawn Cummings
Berkeley Police Department
125 University Avenue
Berkeley, CA 94704
Dear Commander Cummings:
On behalf of the California Highway Patrol (CHP), it is my pleasure to inform you, the Berkeley Police Department, is conditionally approved for Cannabis Tax Fund Grant Program (CTFGP) funding in the amount of $101,783.28. The purpose of this grant funding is to help your agency reduce and mitigate the impacts of impaired driving in your community.
The official Grant Agreement for signature is forthcoming. In order to execute your Grant Agreement, please provide documentation from a local governing body, authorizing your organization to receive this grant funding, to the Cannabis Grants Unit, by email at [email protected], as soon as possible.
Refer to California Code of Regulations Title 13, Division 2, Chapter 13, Section 1890.13(g) for additional information.
The CHP looks forward to partnering with you and your agency on this project in an effort to make California’s roadways a safer place to travel. If you have any questions, please feel free to contact the Cannabis Grants Unit at (916) 843-4360.
Sincerely,
M. W. HEADRICK, Chief
Enforcement and Planning Division
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Jennifer Louis, Chief of Police
Subject: Revenue Grant: Fiscal Years 2025/2026 Alcoholic Beverage Control (ABC) Alcohol Policing Partnership (APP) Grant
RECOMMENDATION
Adopt a Resolution authorizing the City Manager, to execute a grant contract and any subsequent amendments, with the Alcoholic Beverage Control (ABC) in the amount of $75,012 for Fiscal Year 2025/2026.
FISCAL IMPACTS OF RECOMMENDATION
The Berkeley Police Department (BPD) will receive $75,012 in grant funding for Fiscal Year 2025/2026. The funds will support BPD operations aimed at reducing underage drinking, limiting youth access to alcohol, and ensuring compliance by businesses with state laws under the Business and Professions Code. Grant revenues will be deposited into the Police Department’s One-Time Grant Fund. There is no required local match of funds to obtain the grant.
CURRENT SITUATION AND ITS EFFECTS
The City of Berkeley continues to face significant challenges with underage drinking and alcohol-related disturbances, particularly in areas surrounding the University of California, Berkeley. These issues significantly impact public safety, place strain on local law enforcement resources, and diminish the quality of life for residents, students, and visitors.
The consequences of unchecked underage drinking and alcohol-related misconduct extend beyond immediate safety concerns. Excessive alcohol consumption can lead to long-term health impacts, academic decline, increased risks of addiction, and exposure to violence or injury. Community stakeholders, including residents, business owners, and University officials, have voiced concerns over the impact of alcohol misuse on Berkeley’s reputation as a safe, vibrant, and cultured city.
BPD will also collaborate with the Alameda County District Attorney’s Office to bring non- compliant businesses into alignment with state law. A comprehensive, data-driven approach that combines enforcement, education, and community collaboration is required to address these challenges.
21
Revenue Grant: Fiscal Years 2025/2026 Alcoholic
Beverage Control (ABC) Alcohol Policing Partnership (APP) Grant
CONSENT CALENDAR
October 28, 2025
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
BACKGROUND
ABC created the Alcohol Police Partnership (APP) grant in 1995. The primary purpose of the grant is to create strong collaborations between ABC and local law enforcement agencies. The goal of the grant is to target businesses that facilitate sales to minors or intoxicated individuals, deliver education and training to officers, businesses and underage people, and use proactive enforcement measures such as business compliance checks and Minor Decoy operations.
The City of Berkeley has previously received ABC funding, resulting in measurable reductions in alcohol-related incidents, including underage drinking and public intoxication. However, due to a lack of recent ABC grant funding, and significant staffing issues, these problems have resurfaced and intensified, making underage alcohol consumption and public drinking increasingly commonplace.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
There are no identifiable environmental impacts associated with this report.
RATIONALE FOR RECOMMENDATION
The BPD has been awarded an Alcoholic Beverage Control (ABC) grant in the amount of $75,012 funding the department’s ability to enforce alcohol laws including but not limited to underage sales, underage drinking and liquor licensing. Without this funding, BPD’s capacity to reduce alcohol-related crimes as well as alcohol related injuries and overconsumption would be limited.
ALTERNATIVE ACTIONS CONSIDERED
If the award is not accepted, the City will be unable to provide this enhanced level of service to our community.
CONTACT PERSON
Jennifer Louis, Chief of Police, 981-5700
Attachments:
1: Resolution
RESOLUTION NO. ##,###-N.S.
ACCEPT REVENUE GRANT:
BERKELEY POLICE DEPARTMENT TO ACCEPT ALCOHOLIC BEVERAGE
CONTROL ALCOHOL POLICING PARTNERHSIP GRANT FOR THE FISCAL YEAR OF 2025/2026.
WHEREAS, the Police Department is committed to providing a safe and secure environment through vigorous law enforcement within the City of Berkeley; and WHEREAS, underage access to alcohol and excessive drinking is currently a problem within the City of Berkeley; and
WHEREAS, there has been a longstanding problem with underage drinking and the availability of alcohol to people under the age of 21 throughout the City; and WHEREAS, the police department does not have sufficient resources within the existing budget and staffing constraints to expand their work on these specific issues; and WHEREAS, establishments that sell alcoholic beverages and/or bars can be magnets for criminal activity; and
WHEREAS, the underage minors and the young adult community continues to acquire alcoholic beverages through fake identification, merchants who fail to check identification or asking someone to purchase products for them; and
WHEREAS, the Berkeley Police Department desires to undertake enforcement to limit access to alcoholic beverages by minors funded in part from state funds from Alcoholic Beverage Control (ABC); and
WHEREAS, the funds have been appropriated into the ABC Alcohol Policing Partnership grant fund with the understanding that grant funds received hereunder shall not be used to supplant expenditures controlled by this body.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager is hereby authorized to execute a contract and any amendments or extensions with Alcoholic Beverage Control in order to accept funds in the amount of $75,012 from ABC for the enforcement of alcohol related laws for FY 2025-2026.
BE IT FURTHER RESOLVED that any liability arising out of the performance of this contract, including civil court actions for damages, shall be the responsibility of the grant recipient and the authorizing agency. Alcoholic Beverage Control disclaim responsibility for any such liability.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: https://berkeleyca.gov/
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Terrance Davis, Director, Public Works Department Subject: Contract No. 32300085 Amendment: Abbe & Associates, Integrated Zero Waste Management Strategic Plan
RECOMMENDATION
Adopt a Resolution authorizing the City Manager to amend Contract No. 32300085 with Abbe & Associates, to support completion of the Integrated Zero Waste Management Strategic Plan by increasing the contract by $221,400 resulting in a total contract amount not to exceed $721,400 and extending the term through October 31, 2027.
FISCAL IMPACTS OF RECOMMENDATION
Funding is available in the FY2026 Adopted budget in Zero Waste Fund 601.
CURRENT SITUATION AND ITS EFFECTS
This contract amendment expands the consultant’s scope of work in managing the Integrated Zero Waste Strategic Plan (Plan) to include a comprehensive financial analysis that will be inclusive of five years of recommended rate calculations. This body of work will include:
Rate Survey & Comparison;
Financial Analysis & Projections;
Rate Calculations & Recommendations;
Community Engagement Public Workshops;
Prop 218 Design & Support; and
Transfer Station Funding Alternative and Investigation & Data Collection.
These recommendations are designed to ensure adequate revenue to cover operating expenses, maintain appropriate fund reserves, support the implementation of new diversion programs, and fund infrastructure investments necessary to meet the City’s Zero Waste goals.
The Plan identifies the policies, programs, and infrastructure needed to increase the City’s diversion rate to 93 percent over the 10-year planning period. Reaching this level of diversion is essential to advancing the City’s Zero Waste goals and meeting state-
22
Contract No. 32300085 Amendment Abbe & Associates, Integrated Zero Waste Management Strategic Plan CONSENT CALENDAR
October 28, 2025
mandated waste reduction requirements. Increasing diversion reduces the volume of material sent to landfill, helping the City reduce escalating disposal costs, comply with state regulations such as Senate Bill 1383, and achieve its Climate Action Plan goals.
Without continued investment in new programs, diversion strategies, and infrastructure, the City may fall short of regulatory compliance, facing financial penalties, and missing critical milestones in its long-term Zero Waste objectives.
The Plan describes:
The stakeholder-driven planning process which included a citywide survey, listening sessions, interviews and focus groups, in-person and online workshops, and meetings with the City’s Zero Waste Commission and Environment and Climate Commission,
Goals and guiding principles developed through the stakeholder process, The results of the comprehensive Materials Characterization Study conducted and prepared for the plan,
A description of the 33 Zero Waste initiatives to be implemented in the short-term (1-3 years), medium-term (4-7 years), and long-term (8-10 years), Updated information about Transfer Station Feasibility Study (2019), including estimated costs for rebuilding the Transfer Station, and the financing plan for the Transfer Station, and
Costs for implementing the policies, programs and infrastructure identified in the plan and the potential impact on collection rates.
In addition to the Zero Waste Division’s stated programmatic and policy goals, there is a critical need to conduct a comprehensive rate study for both the collection operation and the Transfer Station. This analysis will determine the full staffing and equipment cost of service for collection and disposal, as well as evaluate the financial impacts of new programs and infrastructure needed to achieve the City’s Zero Waste objectives. The Zero Waste Division is currently in the third year of a five-year Proposition 218 Rate Schedule, which was approved by City Council on June 27, 2023. Since adoption, the fund balance has been depleted at a faster pace than anticipated, creating the need to return to City Council in FY 2027 one year earlier than planned to establish a new five- year Proposition 218 Rate Schedule. Past rate studies did not include unanticipated expenses, such as state mandated fleet electrification, 14.5% labor salary increases and emergency repairs to the Transfer Station Tipping Floor.
Contract No. 32300085 Amendment Abbe & Associates, Integrated Zero Waste Management Strategic Plan CONSENT CALENDAR
October 28, 2025
BACKGROUND
The City has a long history of local, state and nationwide environmental leadership.
The City and its community members have implemented many environmentally focused policies, initiatives, and programs, including establishing one of the first municipal recycling programs in the nation.
Public Works is responsible for implementing the City’s solid waste and recycling programs. Staff drive the collection trucks and transfer trucks, operate the Solid Waste and Recycling Transfer Station and provide customer service, accounting, and financial management. City staff also provide outreach, education and customer technical assistance as well as performing customer audits for compliance with mandatory state recycling and organics regulations. Together, 110 employees are responsible for providing services for 28,000 residential and commercial customers throughout the City and 130,000 self-haul customers per year at the Transfer Station.
The City Auditor’s Report, “Underfunded Mandate: Resources, Strategic Plan, and Communication Needed to Continue Progress Toward the Year 2020 Zero Waste Goal,” issued on July 1, 2014, concluded that a comprehensive, written strategic plan that clearly defines roles and responsibilities and assigns sufficient resources is needed to guide the City and its Zero Waste Division towards the goal of achieving zero waste.
Important components to developing an Integrated Zero Waste Management Strategic Plan are the identification of a target percentage for a Zero Waste Goal, determining the potential costs to achieve a set goal, and reevaluating and proposing a revised target year.
On July 24, 2017, the Zero Waste Commission passed a motion recommending the City move forward immediately to: 1) redefine the City’s Zero Waste Goal and 2) issue the RFP for a Zero Waste Management Strategic Plan.
The current contract to be amended with Abbe & Associates is a result of a City RFP process. On April 28, 2022, the City released a Request for Proposal (RFP), Specification No. 22-11477-C, seeking qualified firms for the development and completion of an Integrated Zero Waste Management Strategic Plan (Plan) to provide methodologies and guidance for the City’s Zero Waste Division’s operation, personnel, program and financial requirements to meet the City’s Climate Action Plan and Zero Waste goals.
On June 23, 2022, the City received two proposals from professional consulting firms, which were evaluated by a panel of City staff using a set of RFP criteria that included the City of Berkeley’s local vendor preference policy and the Alameda CTC Local Business Contract Equity (LBCE) program. Both firms demonstrated extensive relevant capabilities and experience in their proposals. The selection panel determined Abbe & Associates LLC to be the highest-ranking firm based on their proposal.
Contract No. 32300085 Amendment Abbe & Associates, Integrated Zero Waste Management Strategic Plan CONSENT CALENDAR
October 28, 2025
The City’s Solid Waste Management Plan (1995 and 2000), the Source Reduction and Recycling Element (1992) and the Climate Action Plan (2009) are the most recent documents guiding the City’s efforts toward eliminating Berkeley's materials sent to landfills to achieve its goal of zero waste. Although proposed, the City’s most recent Solid Waste Management Plan Update (2005) was not formerly adopted by the City.
The 2005 update was designed to achieve a 2010 goal of reaching 75% diversion of all materials being disposed.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
An Integrated Zero Waste Management Strategic Plan will enhance the environmental sustainability of our community through waste reduction, material reuse and recycling,
RATIONALE FOR RECOMMENDATION
An Integrated Zero Waste Management Strategic Plan that incorporates and reflects public, City staff, and City Council input and recommendations are necessary to ensure the City has the committed resources, staffing, and guidelines to meet its Zero Waste Goal.
ALTERNATIVE ACTIONS CONSIDERED
The alternative would be to issue an RFP for the comprehensive financial analysis that will develop five years of recommended rate calculations, which would require a delay in the rate setting process, a duplication of effort and additional cost with two distinct consultants working on the same rate setting process. Amending the existing contract not to exceed amount is the most cost effective, expeditious and efficient route to complete this process.
CONTACT PERSON
Leticia Jaurequi, Solid Waste & Recycling Manager, (510) 981-6362 1: Resolution
RESOLUTION NO. ##,### - N.S.
CONTRACT NO. 32300085 AMENDMENT ABBE & ASSOCIATES, INTEGRATED
ZERO WASTE MANAGEMENT STRATEGIC PLAN
WHEREAS, the City’s Solid Waste Management Plan (1995 and 2000), the Source Reduction and Recycling Element (1992), and the Climate Action Plan (2009) are the most recent documents guiding the city’s efforts toward eliminating Berkeley’s materials sent to landfills to achieve its goal of zero waste; and WHEREAS, the City’s most recent Solid Waste Management Plan Update (2005) was designed to achieve a 2010 goal of reaching 75% diversion of all materials being disposed, it was not formerly adopted by the City Council; and WHEREAS, on October 11, 2022, by Resolution no. 70,563- N.S., City Council authorized contract no. 32300085 to conduct an Integrated Zero Waste Management Plan; and WHEREAS, on June 27, 2023, City Council adopted a Proposition 218 5-year rate schedule; and
WHEREAS, since these rates were adopted, fund balance has been depleted at a faster rate anticipated, resulting in the need to return to City Council in FY 2027, 1 year earlier than expected, resulting in the need to bring forward a new 5-year Proposition 218 rate schedule; and
WHEREAS, funding for this contract is available in the FY 2026 adopted budget in Zero Waste Fund 601.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager, or designee, is authorized to amend Contract No. 32300085 with Abbe & Associates, to support completion of the Integrated Zero Waste Management Strategic Plan by increasing the contract by $221,400 resulting in a total contract amount not to exceed $721,400 and extending the term through October 31, 2027. A recorded signature copy of the said contract and any amendments is to be on file in the City Clerk department.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: http://www.CityofBerkeley.info/Manager
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Terrance Davis, Director, Department of Public Works Subject: Contract No: 32300115 Amendment: On-Call Arborist Services, HortScience Bartlett Consulting
RECOMMENDATION
Adopt a Resolution authorizing the City Manager to execute an amendment to Contract No. 32300115 with HortScience Bartlett Consulting for on-call arborist services, increasing the contract amount by $270,000 for a total not to exceed amount of $395,000 and extending the term of the contract from December 31, 2025, to February 9, 2028.
FISCAL IMPACTS OF RECOMMENDATION
Funding for this contract amendment is available in the Fiscal Year (FY) 2026 capital improvement program budget in the Capital Improvement Fund (501) and Measure FF- Street Repair (166). Funding for FY 2027 and FY 2028 is subject to appropriation in the future fiscal years' capital budget based on the department's needs for arborist services.
CURRENT SITUATION AND ITS EFFECTS
In order for specific capital improvement programs to move forward, City resources must be supplemented with outside arborist consultants. Public Works projects require arborist services to assess trees adjacent to improvements when root systems are exposed during construction to provide recommendations for root treatment and tree preservation strategies, and to monitor construction activities that may impact trees. Additionally, wildlife biology surveys are required when project work limits overlap with sensitive habitat areas and during bird nesting seasons to ensure compliance with environmental regulations. Since Public Works does not have arborist positions and the City does not employ wildlife biologists, consultant services are essential for these specialized assessments. HortScience Bartlett Consulting provides wildlife biology services through their subconsultant LSA Associates.
The contract with HortScience Bartlett Consulting was established to provide on-call arborist services from FY 2023 through FY 2026, with a not to exceed amount of $125,000. This contract was authorized by City Council on September 20, 2022, through Resolution No. 70,534-N.S., following a competitive procurement process (RFQ Specification No. 22-11520-C).
23
Contract Amendment: Contract No. 32300115 CONSENT CALENDAR On-Call Arborist Services, HortScience Bartlett Consulting October 28, 2025
From February 9, 2023, to July 31, 2025, the City has encumbered approximately $90,000 (72%) of the total contract amount for arborist services. The remaining contract capacity is projected to be appropriated by the end of the calendar year. With the anticipated increase in capital improvement projects due to the recent passage of Measure FF, staff proposes amending the contract for HortScience Bartlett Consulting to increase expenditure authority by $270,000 for a total not to exceed amount of $395,000.
These services support the Strategic Plan goal of providing state-of-the-art, well- maintained infrastructure, amenities, and facilities.
BACKGROUND
The Department manages capital projects through design and construction. The Department lacks in-house arborist expertise, necessitating consultant arborist services for projects with work areas adjacent to trees. Additionally, the City does not employ wildlife biologists, making outside consultant services essential for required biological surveys. The City has successfully utilized HortScience Bartlett Consulting to assess trees when roots are exposed during construction, and provide tree protection recommendations. Through HortScience Bartlett Consulting subconsultant LSA Associates, the City has been able to conduct required wildlife surveys including nesting bird assessments in sensitive habitat areas
ENVIRONMENTAL SUSTAINABILITY
There are no negative environmental effects of this action. This contract will help ensure the successful completion of capital improvement projects while protecting the City's urban forest, when feasible. The arborist services help minimize impacts to trees during construction by assessing tree health when roots are exposed and providing mitigation recommendations, supporting safety and the City's climate action goals by preserving mature trees that provide carbon sequestration, air quality improvements, and urban heat island mitigation. Additionally, wildlife biology surveys ensure compliance with environmental regulations and protect sensitive species during construction activities.
RATIONALE FOR RECOMMENDATION
HortScience Bartlett Consulting has expertise in arboriculture and provides wildlife biology services through their subconsultant LSA Associates, and has demonstrated excellent performance under the current contract. Public Works does not have arborist positions and requires these specialized services for its capital improvement projects.
Furthermore, the City does not employ wildlife biologists, making consultant services the only option for required biological assessments including nesting bird surveys and sensitive habitat evaluations. Amending this contract will assist the City in proceeding with planned capital improvement projects while ensuring safety, proper tree protection, and wildlife assessments.
Contract Amendment: Contract No. 32300115 CONSENT CALENDAR On-Call Arborist Services, HortScience Bartlett Consulting October 28, 2025
ALTERNATIVE ACTIONS CONSIDERED
Council could choose not to amend this contract, which would require the City to conduct a new procurement process. This would delay the progress of planned capital improvement projects and could result in gaps in service delivery as the current contract nears capacity.
CONTACT PERSON
Wahid Amiri, Deputy Director, Public Works, (510) 981-6396 Ronald A. Nevels, Manager of Engineering, Public Works, (510) 981-6439 Terrence Salonga, Interim Supervising Civil Engineer, Public Works, (510) 981-6447 Attachments:
1: Resolution – Amendment to Contract with HortScience Bartlett Consulting
RESOLUTION NO. ##,###-N.S.
CONTRACT NO. 32300115 AMENDMENT: HORTSCIENCE BARTLETT
CONSULTING FOR ON-CALL ARBORIST SERVICES
WHEREAS, on September 20, 2022, by Resolution No. 70,534-N.S., the City Council authorized Contract No. 32300115 with HortScience Bartlett Consulting for on-call arborist services, in an amount not to exceed $395,000 for a three-year period expiring December 31, 2025; and
WHEREAS, HortScience Bartlett Consulting provides both arborist services directly and wildlife biology services through their subconsultant LSA Associates; and WHEREAS, the City does not have arborist positions within Public Works or wildlife biologist staff positions citywide to perform the necessary specialized services required for capital improvement projects; and
WHEREAS, capital improvement projects can require specialized services including tree assessments when roots are exposed during construction and wildlife surveys in sensitive habitat areas and during bird nesting season; and
WHEREAS, the City desires to retain on-call arborist services for various Public Works projects, including multiple projects from recently approved Measure FF; and WHEREAS, HortScience Bartlett Consulting has demonstrated excellent performance in providing arborist services directly and wildlife biology services through their subconsultant LSA Associates under the current contract; and WHEREAS, funding is available in the FY 2026 budget in the Capital Improvement Fund 501 and Measure FF-Street Repair Fund 166, and funding for future years will be identified and requested for appropriation as project needs arise.
NOW THEREFORE, BE IT RESOLVED by the Council of the City of Berkeley that the City Manager is authorized to execute an amendment to Contract No. 32300115 with HortScience Bartlett Consulting for on-call arborist services, increasing the amount by $270,000 for a total not to exceed $395,000 and extending the term of the contract to February 9, 2028. A record signature copy of said contract and any amendments will be on file in the Office of the City Clerk.
Office of the City Manager
2180 Milvia Street, Berkeley, CA 94704 ● Tel: (510) 981-7000 ● TDD: (510) 981-6903 ● Fax: (510) 981-7099 E-Mail: [email protected] Website: https://berkeleyca.gov/
CONSENT CALENDAR
October 28, 2025
To: Honorable Mayor and Members of the City Council
From: Paul Buddenhagen, City Manager
Submitted by: Terrance Davis, Director, Public Works
Subject: Contract for Construction (Bauman Landscape and Construction, Inc.) and Contract No. 32300026: Amendment for Engineering Services (Diablo Engineering Group) for the Ohlone Greenway Modernization and Safety Project
RECOMMENDATION
Adopt a Resolution:
1. Approving plans and specifications for the Ohlone Greenway Modernization and Safety Project, Specification No. 26-11748-C;
2. Accepting the bid of Bauman Landscape and Construction, Inc., the lowest responsive and responsible bidder;
3. Authorizing the City Manager to execute a contract with Bauman Landscape and Construction, Inc. and any amendments, extensions, and/or change orders until completion of the Project in accordance with the approved plans and specifications, in an amount not to exceed $3,782,000, which includes a 10% contingency for unforeseen circumstances; and
4. Authorizing the City Manager to execute a contract amendment with Diablo Engineering Group to provide engineering services during the construction phase of the Project, increasing the contract amount by $100,000 for a total not-to- exceed amount of $650,000.
SUMMARY
The purpose of the Ohlone Greenway Modernization and Safety Project (Project) is to construct operational and safety improvements to the Ohlone Greenway from the Virginia Gardens crossing at the southernmost Project limit to the Santa Fe Avenue crossing at the northernmost limit. The Project goals are to: upgrade the pathway as a low-stress multi-use pathway; improve the comfort of all pathway users; and improve safety especially at roadway intersections and during non-daylight hours. Construction for this project will be funded by an Alameda County Transportation Commission (Alameda CTC) Vehicle Registration Fee program grant, a Bay Area Rapid Transit (BART) Safe Routes to BART Measure RR grant, and local funds.
24
Contract for Construction (Bauman CONSENT CALENDAR
Landscape and Construction Inc.) and
Contract Amendment for Engineering Services (Diablo Engineering Group) October 28, 2025 for the Ohlone Greenway Modernization and Safety Project
Construction Contract
The Project was advertised through an open and competitive bidding process. Bids were publicly opened on September 23, 2025, and Bauman Landscape and Construction, Inc. was determined to be the lowest, responsive, and responsible bidder, submitting a bid of $3,438,098.80, which falls within the approved Project budget. Staff recommends awarding the construction contract for this Project to Bauman Landscape and Construction, Inc.
Engineering Services Contract
The City’s design team, comprised of Public Works staff and the design consultant, Diablo Engineering Group (Diablo), developed conceptual designs, conducted public outreach, reviewed and incorporated feedback from the community, City departments, and transit agencies, and finalized the design by preparing plans, specifications, and estimates (PS&E). During this process, City staff determined that additional funding is needed under Diablo’s contract to provide engineering design-related services through the duration of construction. $40,000 has been budgeted from the Measure BB Bike & Pedestrian Fund (135) but requires a contract amendment to increase the not-to-exceed amount. Staff recommends increasing the contract amount by $100,000, for a total not- to-exceed amount of $650,000, to ensure sufficient contract capacity should additional work be required to keep the Project on schedule.
FISCAL IMPACTS OF RECOMMENDATION
The construction budget for the Ohlone Greenway Modernization and Safety Project (Project) is $3,782,000, including contingency. As the Project’s construction phase is anticipated to start in FY 2026 and end in FY 2027, funding will be appropriated over these two fiscal years as follows:
Construction Funding for
Ohlone Greenway Modernization and Safety Project
(FY 2026 & FY 2027)
Alameda CTC Grant Funding – VRF (Fund 307) $1,020,159
Safe Routes to BART Measure RR (Fund 307) $2,761,841
Total Construction Funding $3,782,000
Low bid by Bauman Landscape and
Construction, Inc.
$3,438,098.80
10% Construction Contingency $343,901.20
Total Not-to-Exceed Construction Cost $3,782,000.00
Contract for Construction (Bauman CONSENT CALENDAR
Landscape and Construction Inc.) and
Contract Amendment for Engineering Services (Diablo Engineering Group) October 28, 2025 for the Ohlone Greenway Modernization and Safety Project
In addition, Staff have identified $40,000, to be funded in FY 2026 and FY 2027, for design-related services by Diablo during the construction phase as follows. Although $40,000 has been budgeted at this time, staff is requesting an increase of $100,000 to the Diablo contract authority, as shown below, as a contingency and to provide the ability to act swiftly should additional services be needed during construction.
Diablo Engineering Services Contract for
Ohlone Greenway Modernization and Safety Project
Measure B Bike & Ped (Fund 131)1 $225,978
Measure BB Bike & Ped (Fund 135)1 $73,180
Alameda CTC Grant Funding – VRF (Fund 307)1 $250,842
Measure BB Bike & Ped (Fund 135)2 $40,000
Total Funding for Diablo Engineering
Services Contract
$590,000
1 Funding budgeted for FY 2023-FY 2025
2 Funding budgeted for FY 2026-FY 2027
Current Diablo Engineering Services Contract No. 32300026 $550,000 Proposed Amendment for Design-Related Services during Construction $40,000 Proposed Amendment for Contingency Design-Related Services $60,000 Total Not-to-Exceed Contract Amount $650,000
No other contractor or consultant funding is expected to be required for the remainder of this Project.
CURRENT SITUATION AND ITS EFFECTS
Key Project Elements
The Project includes the following elements:
Widening the Ohlone Greenway multi-use pathway and updating lighting with new dark-skies compliant pathway lighting where feasible. On-street, buffer-protected two-way cycle track on Peralta Avenue between Hopkins Street to the south and the Ohlone Greenway to the north. Safety improvements at the Virginia Gardens, Cedar Street, Rose Street, Hopkins Street, Peralta Avenue, Gilman Street, and Santa Fe Avenue crossings, consisting of combinations of traffic calming elements including rectangular rapid flashing beacons (RRFBs), raised crosswalks, high-visibility crosswalk markings, curb extensions, and/or median refuges.
These elements were included as Project-specific recommendations in the Council- approved 2017 Berkeley Bicycle Plan.
Contract for Construction (Bauman CONSENT CALENDAR
Landscape and Construction Inc.) and
Contract Amendment for Engineering Services (Diablo Engineering Group) October 28, 2025 for the Ohlone Greenway Modernization and Safety Project
Public Outreach
Staff have actively engaged with the public on numerous occasions during development of the Project. Where feasible, stakeholder comments have been incorporated in the Project design. In addition to regular updates to the Project website and email correspondence, below is a summary of significant public engagement activities:
November 2022: The Project team hand-delivered letters to residences on Peralta Avenue and the Hopkins Park Apartments to initiate individual discussions about the proposed two-way cycle track on Peralta Avenue. February 2023: Staff and design consultants held two in-person events at Cedar Rose Park where the proposed conceptual design options were discussed. February 2023: Staff and design consultants hosted an online community meeting to present the proposed conceptual design options in detail, inform the public about the Project website and upcoming online survey, and respond to questions.
February 2023 – March 2023: Staff invited comments via an online survey. The survey was advertised via sidewalk stickers, posted signage along the pathway, and postcards to all residences within 300 feet of the Project area. Staff received input from over 500 participants.
August 2023: Staff posted revised conceptual design plans on the Project website for community input.
September 13, 2023: Staff presented to the Commission on Disability to discuss design considerations.
September 2023: Staff posted the final conceptual design on the Project website, which addressed design considerations that arose from community engagement and balanced competing interests, such as preservation of green space and trees versus pathway width.
January 18, 2024: Staff provided a Project overview to the Transportation & Infrastructure Commission (TIC).
February 7, 2025: Staff met community garden volunteers to provide a Project update and discuss upcoming coordination to preserve existing vegetation to the extent feasible.
In addition, the Project team engaged in ongoing email correspondence with stakeholder groups including residents adjacent to the site and the community gardens along Peralta Avenue, during the design development phase of the Project.
Construction Contract
On August 25, 2025, the City released an Invitation for Bids for the Project construction, under Specification No. 26-11748-C. On September 23, 2025, nine bids were opened, with bids ranging from $3,438,098.80 to $4,005,300.00. The determination of the lowest bid was based on the total bid price, as described in the bid documents. The lowest bidder is Bauman Landscape and Construction, Inc., with a bid of $3,438,098.80. Staff have identified funding to cover the total bid price of the low bidder, plus a 10 percent
Contract for Construction (Bauman CONSENT CALENDAR
Landscape and Construction Inc.) and
Contract Amendment for Engineering Services (Diablo Engineering Group) October 28, 2025 for the Ohlone Greenway Modernization and Safety Project
contingency, as indicated above. Staff have verified that Bauman Landscape and Construction, Inc. is the lowest responsive and responsible bidder.
The Living Wage Ordinance does not apply to this Project as Department of Public Works construction contracts are, pursuant to City policy, subject to State prevailing wage laws. Bauman Landscape and Construction, Inc. has submitted a Certification of Compliance with the Equal Benefits Ordinance. The Community Workforce Agreement applies to this project because the construction cost exceeds $500,000. As a result, the successful bidder and all subcontractors will be required to sign an agreement to be bound by the terms of the Community Workforce Agreement.
Engineering Services Contract
In February 2022, Diablo was selected by City staff via a Project-specific open competitive request for qualifications (RFQ) process for preliminary engineering and final design services. Council adopted a resolution (No. 69,709-N.S) on April 26, 2022 authorizing the City Manager to execute a contract with Diablo for preliminary engineering and final design services for the Project. The City subsequently executed a contract with Diablo (Contract No. 32300026) for a not-to-exceed amount of $550,000.
Diablo’s contract included $36,487 for engineering design-related services during the construction phase, but due to (1) a more lengthy and robust community engagement process in response to numerous comments from the public on conceptual design options, (2) irrigation design as a result of a new pollinator garden and 18 new trees to be planted in Cedar Rose Park, also in response to community input, and (3) additional administrative and project management efforts due to a longer-than-anticipated project duration, which were all authorized by City staff to progress the Project, $40,000 is needed to meet Diablo’s expense for design-related services during the construction phase. Such services are anticipated to include responses to technical inquiries from the contractor, reviewing and approving submittals for construction materials, and on- site construction observation and guidance to ensure compliance with the design, as Diablo is the engineer-of-record for the Project.
Staff is requesting an amendment to Diablo’s contract to increase the contract amount by $100,000 for a total not-to-exceed amount of $650,000. This will allow staff to act swiftly during construction should additional services be needed due to circumstances such as unanticipated complexity of the electrical design, the need for increased oversight to protect trees during construction, increases in consultant rates since the project was originally scoped in 2022, and unforeseen circumstances that may arise during construction. Unutilized funds will revert back to their original funding sources at the completion of the Project.
Strategic Plan Goals
The Project is in alignment with the Strategic Plan Priority of advancing the City’s goal to provide state-of-the-art, well-maintained infrastructure, amenities, and facilities.
Contract for Construction (Bauman CONSENT CALENDAR
Landscape and Construction Inc.) and
Contract Amendment for Engineering Services (Diablo Engineering Group) October 28, 2025 for the Ohlone Greenway Modernization and Safety Project
BACKGROUND
The purpose of the Ohlone Greenway Modernization and Safety project is to construct operational and safety improvements to the Ohlone Greenway from the Virginia Gardens crossing at the southernmost Project limit to the Santa Fe Avenue crossing at the northernmost limit. The Project goals are to: upgrade the pathway as a low-stress pedestrian and bicycle path; improve the comfort of all pathway users; and improve safety, especially at roadway intersections and during non-daylight hours.
The Project will implement the 2017 Berkeley Bicycle Plan Tier 1 priority recommendations for the pathway and intersection improvements to the Greenway. In particular, the Project includes crossing safety improvements at two High-Injury Street segments Cedar Street and Rose Street- as identified in the 2020 Vision Zero Action Plan. The improvements are also included in the 2016 Berkeley Strategic Transportation (BeST) Plan.
Previous Resolutions and Contracts Associated with Project Funding and Expenses January 26, 2021: Council adopted Resolution No. 69,709-N.S authorizing the City Manager to submit unfunded BeST Plan Second Addendum Five-Year Priority Projects to the Alameda County Transportation Commission (Alameda CTC) for inclusion in their five-year Comprehensive Investment Plan (CIP) for fiscal year 2022 through 2026, accept the grants awarded, and execute any resultant agreements and amendments. In December 2021 a revenue contract (Alameda CTC Agreement No. A22-0024) was executed in the amount of $1.271 million to fund a portion of consultant and construction costs for the Project. This agreement expires on December 31, 2027, though staff intends to complete the project in early 2027.
April 26, 2022: Council adopted Resolution No. 70,321-N.S. authorizing the City Manager to execute a contract and any amendments with Diablo Engineering Group for preliminary engineering and final design for the Project, for an amount not to exceed $550,000, for the period from June 1, 2022 through December 31, 2024. In August 2022 Contract No. 32300026 was executed with Diablo Engineering Group for an amount not to exceed $550,000. In December 2024 the City Manager extended the term of this contract through December 31, 2025.
An additional extension will be needed to extend the term of the contract through June 30, 2027. Staff will continue to review the need to extend this contract on an annual basis until the completion of construction, which is anticipated for early 2027.
October 10, 2023: Council adopted Resolution No. 71,076-N.S. authorizing the City Manager to submit a grant application to Bay Area Rapid Transit (BART) to receive up to $3 million from the Safe Routes to BART (SR2B) Grant Program. In
Contract for Construction (Bauman CONSENT CALENDAR
Landscape and Construction Inc.) and
Contract Amendment for Engineering Services (Diablo Engineering Group) October 28, 2025 for the Ohlone Greenway Modernization and Safety Project
October 2024 a revenue contract was executed in the amount of $3 million to fund the remainder of the Project construction costs. This agreement requires the project to be completed by February 2028, though staff intends to complete the project in early 2027.
April 15, 2025: Council approved a $150,000 Budget Referral, “Ohlone Greenway Safety Improvements Project Unfunded Balance” authored by Councilmember Kesarwani to fund the completion of the Project design. On June 24, 2025 Council adopted the FY 2026 Budget Update which included the funding requested in the budget referral.
ENVIRONMENTAL SUSTAINABILITY AND CLIMATE IMPACTS
The Project was determined to be exempt from the California Environmental Quality Act (CEQA) and a Notice of Exemption (NOE) was filed in December 2023. The Project addresses safety issues and modernizes the Ohlone Greenway to create a safer and more seamless path of travel for a variety of destinations, including the North Berkeley BART station. Increasing cycling and walking and improving connections to transit supports Goal 5: Accelerate Implementation of the City’s Bicycle & Pedestrian Plans in the City’s Climate Action Plan because it reduces emissions in the community and in the region.
RATIONALE FOR RECOMMENDATION
Not taking the recommended actions at this time would risk the following: (1) missing an important window of opportunity for construction during seasons of drier weather (spring to fall 2026), (2) increased construction and overall project costs if the Project is delayed, and (3) the City defaulting on its obligations to deliver the Project by the grant funding deadlines.
ALTERNATIVE ACTIONS CONSIDERED
No alternative actions were considered for this Project. The City conducted a public bid process and Bauman Landscape and Construction, Inc. submitted the lowest responsive and responsible bid. The work to implement this Project requires contracted services, as the City does not possess the in-house labor, equipment resources, or the design engineer’s knowledge as engineer-of-record, which are necessary to complete this work.
CONTACT PERSON
Wahid Amiri, Deputy Public Works Director, 510-981-6396 Mark Helmbrecht, Transportation Manager, Public Works, 510-981-6403 Kenneth Jung, Supervising Civil Engineer, Public Works, 510-981-7028 Jesse Peoples, Associate Civil Engineer, Public Works, 510-981-6449 Attachments:
1: Resolution