Cities Index.
Agenda packet, second session

Brentwood City Council
June 10, 2025

Document
Agenda packet, second session
Meeting
June 10, 2025
Body
Brentwood City Council
Pages
590
Original file
257.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-brentwood.escribemeetings.com. That file is the official record.

JUNE 10, 2025, 7:00 PM

CITY COUNCIL/SUCCESSOR AGENCY AGENDA
CITY COUNCIL CHAMBERS, 150 CITY PARK WAY
*IMPORTANT NOTICE ABOUT PUBLIC COMMENTS AND MEETING PARTICIPATION* City Council Members will be participating from the Council Chamber. Members of the public are invited to attend and participate at: the Council Chambers, 150 City Park Way, Brentwood CA As a courtesy and technology permitting, members of the public may provide remote public comment during public hearings and on business items via the City’s Zoom Platform. However, the City cannot guarantee that the public’s access to teleconferencing technology will be uninterrupted, and technical difficulties may occur from time to time. In those instances, so long as the public may still attend the meeting in person, the meeting will continue. In addition, the Zoom participation option is provided to the public as a courtesy in order to facilitate participation. If Zoom participation is not enabled, the meeting will continue with public attendance in person only. Members of the public desiring to provide comments as a part of the meeting are encouraged to either submit written comments by 3:00 p.m. prior to the meeting or to attend the meeting in person.

HOW PARTICIPATE
The public is invited to participate in the City Council meeting using any of the following methods:

1. IN PERSON:
a. Members of the public can provide in-person comments in the Council Chambers.

Members of the public are encouraged, but not required, to fill out a speaker card. The Council Chambers will have seating available for members of the public to attend in person up to full seating capacity.

2. REMOTE (if enabled): Remarks by members of the public participating via Zoom are limited to speaking on items listed under public hearings; business items; and requests for future agendas items, existing requests. Zoom participation during the general public comment period will not be accepted, except in the event a City Council Member is participating remotely under the provisions of Government Code § 54953 (f). a. Zoom: www.brentwoodca.gov/vcc or Zoom Webinar ID: 760 1397 0037 b. Zoom Phone Numbers. Dial Toll Free: (833) 548-0276 or (833) 548-0282 or (877) 853-5247.
c. During the meeting, each period for public comment will be announced, and participants may use the “Raise Hand” feature on Zoom to request to speak. (If you need instructions on how to use this feature, please contact the City Clerk by noon of the meeting date at [email protected] or 925.516.5182.)

3. E-MAIL
a. Public comments can also be submitted via e-mail to [email protected].

Any public comments received up until 3:00 p.m. of the meeting date will be:

1. distributed to the Council via email before the meeting,

2. posted online for public inspection at www.brentwoodca.gov/meetings and

3. later summarized in the meeting minutes.
b. As e-mails containing public meeting comments are part of the official record, note that personal contact information may be published if it is included with your e-mail.

4. TO WATCH OR LISTEN ONLY:
a. The public may view the meeting via one-way video feed by selecting the video option at the City Council Agendas’ link on the City webpage at www.brentwoodca.gov or via the City’s YouTube Channel: https://www.youtube.com/c/cityofbrentwoodca

CITY COUNCIL/SUCCESSOR AGENCY AGENDA
Zoom Webinar ID: 760 1397 0037

June 10, 2025, 7:00 p.m.

City Council Chambers
150 City Park Way
Brentwood, CA 94513
City Council Zoom Link
A. CALL TO ORDER & ROLL CALL
B. PLEDGE OF ALLEGIANCE
C. PRESENTATIONS
C.1 Internship Program Review
D. PUBLIC COMMENTS
Pursuant to Council/Administrative Policy, Meeting Rules and Procedures section 5.2 (Decorum Generally – Public), comments by members of the public are generally limited to five minutes, or less time if a large number of speakers is anticipated, or if approved by the Mayor. Speakers desiring answers to questions should direct them to the Council/Successor Agency and, if relevant, they may direct them to the appropriate staff member. Speakers can also follow up directly with staff during regular City business hours.

Please file a speaker’s card with the City Clerk on the form provided on the counter at the back of the Chambers.

During this portion of the meeting those present in the Council Chambers are permitted to speak on items that are listed under Presentations; Informational Reports; Consent Calendar; Requests for Future Agenda Items- New Items; or items not on the agenda during this portion of the meeting. Public comments for scheduled agenda items should wait until that time.

In order to ensure that all speakers feel welcome to share their views, members of the audience are kindly requested to refrain from applauding or speaking to the Council from the audience without being called upon first.

Zoom participation during this general public comment period will not be accepted.

E. INFORMATIONAL REPORTS FROM COUNCIL MEMBERS, COMMITTEES, LIAISONS, AND STAFF This portion of the agenda is to provide an opportunity for Council Members to report on attendance at events, subcommittee meetings, and entities on which the Council Member has been appointed as a liaison and for staff to provide brief updates and/or information to the City Council.

F. CONSENT CALENDAR
All matters listed on the consent calendar are considered routine in nature and will be enacted by one motion. If discussion is required, that particular item will be removed from the consent calendar and will be considered separately.

F.1 Meeting Minutes of the City Council
Special City Council Meeting of May 27, 2025
City Council / Successor Agency Meeting of May 27, 2025 F.2 A Proclamation recognizing June 19, 2025, as Juneteenth F.3 Adopt the City of Brentwood Local Roadway Safety Plan Title/Recommendation
Adopt a Resolution adopting the City of Brentwood Local Roadway Safety Plan.

The project is exempt from the California Environmental Quality Act (CEQA) in accordance with CEQA Section 15262.

F.4 Authorize the City Manager to approve Amendment No. 1 with PowerGen Inc. for an additional $40,000; and to execute an agreement or other necessary documents with Municipal Maintenance Equipment to increase the purchase order by an additional $30,000 Title/Recommendation
Adopt a Resolution approving and authorizing the City Manager or designee to execute Amendment No. 1 with PowerGen Inc. for an additional $40,000, for a total not to exceed amount of $160,000 for FY 2024/25, for emergency back-up generator maintenance and repair services to include, but not be limited to, quarterly testing, annual testing, and load bank testing; and to execute an agreement or other necessary documents with Municipal Maintenance Equipment for an additional $30,000, for a total not to exceed amount of $97,000 for FY 2024/25, for Fleet related parts, supplies, and services for the City’s street sweepers and sewer cleaning trucks, and installation of additional safety equipment on the street sweepers.

F.5 Consider appointment of new Commissioners to the City of Brentwood Youth Commission Title/Recommendation
Appoint new Commissioners to the Brentwood Youth Commission.

F.6 Adopt a Resolution delegating annual management responsibility for the investment program to the City Treasurer for FY 2025/26 and make additional amendments to Council Administrative Policy 10-4, Investment Policy
Title/Recommendation
Adopt a Resolution delegating annual management responsibility for the investment program to the City Treasurer for FY 2025/26 and make additional amendments to Council Administrative Policy 10-4, Investment Policy.

F.7 Adopt a Resolution Adopting the 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex
Title/Recommendation
Adopt the proposed resolution adopting the 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex.

F.8 Consideration of appointments to the Contra Costa Transportation Authority’s Citizens Advisory Committee and to the Contra Costa County Advisory Council on Aging Title/Recommendation
Consider Mayor Meyer’s appointment of 1) Ravi Vedantham to the Contra Costa Transportation Authority’s Citizens Advisory Committee, for a four-year term; and 2) Cesar Court to the Contra Costa County Advisory Council on Aging for a two-year term.

G. PUBLIC HEARINGS
Persons addressing the City Council using Zoom are asked to raise their hands using the Zoom feature. Those attending in person and wishing to address the Council may do so from the podium. The Council may adopt reasonable regulations at the onset of the public hearing to facilitate public testimony. These regulations may include time limits. In the absence of such regulations, the public hearing shall follow the protocol for Public Comments.

G.1 Continuance of a public hearing pertaining to the City’s Landscape and Lighting Assessment District No. 23-1 Annexation No. 1 for Fiscal Year 2025/26 Title/Recommendation
It is requested that the City Council continue the public hearing relating to the annexation of territory (Annexation No. 1) to existing Landscape and Lighting Assessment District No. 23-1 (Orchard Grove) for Fiscal Year 2025/26 to a date uncertain.

Page 2 of 590 ends

H. BUSINESS ITEMS
Persons addressing the City Council using Zoom are asked to raise their hands using the Zoom feature. Those attending in person and wishing to address the Council may do so from the podium. The Council may adopt reasonable regulations at the onset of each business item to facilitate public testimony. These regulations may include time limits. In the absence of such regulations, the item shall follow the protocol for Public Comments. Public comment on each of the following items is limited to what is described in the specific agenda item.

H.1 Consider approval of successor Memorandum of Understanding between the City of Brentwood and the Brentwood Employees Association Miscellaneous Office Division for 7/1/2024 – 6/30/2027 and authorize approval of all necessary actions to implement the MOU
Title/Recommendation
Adopt a Resolution Approving and Authorizing the City Manager to: 1) execute a Successor Memorandum of Understanding between the City of Brentwood and the Brentwood Employees Association Miscellaneous Office Division for the period of July 1, 2024 through June 30, 2027; 2) establish seven (7) new classifications, job descriptions, and salary ranges; 3) abolish eighteen (18) obsolete classifications, job descriptions, and salary ranges; 4) adopt an updated 2024/25 Pay Schedule in accordance with 2 CCR Section 570.5, and authorize the Director of Human Resources/Risk Manager in consultation with the City Attorney to make ministerial revisions to it; and 5) adopt Appropriations Amendments to the 2024/25 – 2025/26 General Fund Operating Budget.

H.2 Accept work performed by Goodfellow Sequoia A JV and file a Notice of Completion for Sand Creek Road Extension, CIP Project No. 336-31700; increase the contract amount by $426,614.30; amend the 24/25-28/29 CIP; and amend the 24/25 Operating Budget Title/Recommendation
Adopt a Resolution: 1) approving and authorizing the City Manager or designee to execute Change Order No. 8 to the Contract with Goodfellow Sequoia A JV for Sand Creek Road Extension, CIP Project No. 336-31700 (“Project”), in the amount of $427,205.52, and increase the Contract Price by $426,614.30 for a total Contract Price of $11,427,377.61; 2) amending the 2024/25 – 2028/29 Capital Improvement Program (“CIP”); 3) amending the 2024/25 Operating Budget for the associated Project funding transfer; 4) accepting the work performed by Goodfellow Sequoia A JV for the Project; and 5) requesting the City Clerk file a Notice of Completion with the County Recorder.

H.3 Call for review of a Design Review application for Fire Station #94, proposed to be located on a vacant parcel at 739 First Street in the Downtown
Title/Recommendation
The City Council has two options:

Deny the project, thus upholding the Planning Commission’s action to deny the project, by adopting a resolution based upon direction and proposed findings provided by the City Council (see draft resolution included as Attachment 3); or

1. Approve the project, consistent with staff’s original recommendation to the Planning Commission, thus reversing the Planning Commission’s action to deny the project. A draft resolution for approval is included as Attachment 4.

2. Staff has determined that the project qualifies as a Class 32 categorical exemption under the California Environmental Quality Act (“CEQA”, codified at Public Resources Code §§ 21000, et seq., and further governed by the State CEQA Guidelines, found at 14 CCR §§ 15000, et seq.) Guidelines Section 15332 (In Fill Development Projects), insomuch as the proposed fire station is consistent with the applicable General Plan designation, as well as with the applicable zoning designation and regulations, is proposed on a project site less than 5-acres in size, has no value as habitat for endangered species, would not result in significant effects relating to traffic, noise, air quality, or water quality, and can be adequately served by all utilities and public services.

Page 3 of 590 ends

I. REQUEST FOR FUTURE AGENDA ITEMS - NEW REQUEST(S)
Council Members wishing to have an agenda item placed on a future agenda shall make a request under this section of the agenda. These items will be included on the agenda for the next Council meeting
J. ADJOURNMENT
Any disclosable public records related to an agenda item for the open session of this meeting distributed to all or a majority of the City Council less than 72 hours before this meeting is available for inspection at City Hall, located at 150 City Park Way, during normal business hours.

These writings will also be available for review at the City Council meeting in the public access binder in the entrance of the City Council Chambers.

Public comments received after 3:00 p.m. of the meeting date, but prior to the start of the meeting, will be emailed to the City Council, posted online at www.brentwoodca.gov/councilmeetingonline within one day following the meeting, and will be summarized in the meeting minutes.

The Closed Captioning provided via Zoom is auto generated. It is not the official record and is provided as a convenience.

If you challenge the any of the matters listed under 'Public Hearings' in court, you may be limited to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the Brentwood City Council at, or prior to, the public hearing
NOTICE
In compliance with the Americans with Disabilities Act, the meeting room is wheelchair accessible and disabled parking is available at the City Hall parking lot. If you are a person with a disability and you need disability-related modifications or accommodations to participate in this meeting, please contact the City Clerk's Office at (925) 516-5440 or fax (925) 516-5441. Notification 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility to this meeting. {28 CFR 35.102-35, 104 ADA Title II}

POSTING STATEMENT
On June 5, 2025, a true and correct copy of this agenda was posted on the City Hall Bulletin Board, outside City Hall, 150 City Park Way, Brentwood, CA 94513 and at our website www.brentwoodca.gov
A complete packet of information is available for public review at City Hall or on our website at www.brentwoodca.gov

Page 4 of 590 ends

1 SPECIAL CITY COUNCIL MINUTES
May 27, 2025, 6:30 p.m.

A. CALL TO ORDER & ROLL CALL
Mayor Meyer called the meeting to order at 6:30 p.m.

Roll Call found the following members present: Maloney, Pierson, Mendoza, Oerlemans, and Mayor Meyer.

B. PLEDGE OF ALLEGIANCE
Mayor Meyer led the Pledge of Allegiance.

C. PUBLIC COMMENTS
Mayor Meyer opened public comments.

There being no one wishing to speak, Mayor Meyer closed public comments.

D. RECESS TO CLOSED SESSION
Moved by: Faye Maloney, Council Member
Seconded by: Tony Oerlemans, Council Member
The Council, by motion, moved to recess into Closed Session at 6:32 p.m.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
E. BUSINESS ITEMS
E.1 CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION F. ADJOURNMENT
Council reconvened at 7:02 p.m. with nothing to report out from Closed Session.

Moved by: Faye Maloney, Council Member
Seconded by: Tony Oerlemans, Council Member
The Council, by motion, moved to adjourn at 7:02 p.m.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)

Page 5 of 590 ends

1 CITY COUNCIL/SUCCESSOR AGENCY MINUTES
May 27, 2025, 7:00 p.m.

A. CALL TO ORDER & ROLL CALL
Mayor Meyer called the meeting to order at 7:02 p.m.

Roll Call found the following members present: Maloney, Pierson, Mendoza, Oerlemans, and Mayor Meyer.

B. PLEDGE OF ALLEGIANCE
Mayor Meyer led the Pledge of Allegiance.

C. PUBLIC COMMENTS
Mayor Meyer opened public comments.

Danny Dohrmann, Paul Radliff, Roger Cocksedge, Daniel Duran, Travis Martin, Don Hester, and Dolores Long provided comments in support of the Planning Commission's decision to deny the Design Review application for Fire Station 94.

Rod Flohr provided comments regarding an OpEd printed in the Brentwood Press, authored by Supervisor Diane Burgis.

There being no additional speakers, Mayor Meyer closed public comments.

D. INFORMATIONAL REPORTS FROM COUNCIL MEMBERS, COMMITTEES,

LIAISONS, AND STAFF
Council Member Oerlemans reported on attendance at the Egret Park Ribbon Cutting; the John Marsh Historic Trust Board Meeting; Farmer's Market; watched the Land Use and Development Meeting; attended the Rotary Club Whiskey Walk at The Yard; the Memorial Mile and Picnic at Brentwood Elementary School; the Downtown Brentwood Coalition Bags and Brews event; and agenda review.

Council Member Maloney reported on attendance at Egret Park Ribbon Cutting; Union Cemetery for National Law Enforcement Ceremony in honor of Sergeant Scott Lunger; Senior Health and Resource Fair at the Brentwood Senior Activity Center; meeting with Chris Bachman, Assistant Fire Chief/Fire Marshal; watched the Land Use and Development Meeting; met with residents and business owners from District 1; A Steep In Time Ribbon Cutting hosted by the Brentwood Chamber of Commerce, and graduation ceremony to receive her Master's Degree.

Page 6 of 590 ends

2 Council Member Mendoza reported on attendance at the Egret Park Ribbon Cutting; a CalCities Latino Legislative Caucus meeting; Senior Health and Resource Fair at the Brentwood Senior Activity Center; The Trilogy at the Vineyards Veterans Association Silent Auction Fundraiser; Land Use and Development Meeting; Garin 3rd graders field trip to the Council Chambers; a "Know Your Rights" event; the Downtown Brentwood Coalition Bags and Brews event; and the Memorial Day event at Union Cemetery.

Vice Mayor Pierson reported on attendance at agenda review; Courtyard Marriott Grand Opening Ribbon Cutting; National Alliance on Mental Illness Change Agent Awards Ceremony; Farmer's Market; Land Use and Development meeting; Statement on Auditing Standards No. 99:

Consideration of Fraud interim audit meeting; the Egret Park Ribbon Cutting; Fremont Bank mixer; Artisan Peacock Ribbon Cutting; watched Board of Supervisors meetings; attended the East Bay Leadership Council speaker series with Assemblymember Anamarie Ávila Farías; and the Memorial Day event at Union Cemetery.

Mayor Meyer reported on attendance at Statement on Auditing Standards No. 99: Consideration of Fraud interim audit meeting; the Egret Park Ribbon Cutting; Four City Rotary event honoring East County Mayors; the Hindu Education Foundation Guru Vandina in honor of teacher appreciation; watched the Lafayette Planning Commission meeting staff presentation on the Sunflower Hill Accessible and Affordable Housing Project; Helping One Woman benefit for Lauren Huffmaster; Downtown Brentwood Coalition Bags and Brews event; the Memorial Day event at Union Cemetery; met with Heritage High School student interested in an internship; watched the Land Use and Development Meeting; and attended the California Alliance of Local Electeds meeting.

Interim City Manager, Darin Gale, thanked Public Works for all of the work put into the Public Works Open House 2025; attended a meeting with Brentwood Union School District Superintendent, Dana Eaton; meeting with a developer interested in purchasing a piece of property in the Innovation Center; attended a ride-along with each of the Solid Waste routes; participated in Shadow Lakes Community Clean-Up Event; Brentwood Police Department's Blood Drive; spoke with Rodd Lee, Assistant General Manager, External Affairs at Bay Area Rapid Transit, they are currently not interested in selling any properties in Brentwood; meeting with Aaron McAlister, Deputy Fire Chief, Administration to discuss the parcel at Sand Creek - they will continue to pursue their current application with the City.

E. CONSENT CALENDAR
The Council, by motion, moved to adopt the Consent Calendar as recommended by staff including revisions noted in the staff memo provided for Item E.2., with Council Member Maloney recusing herself from Item E.2, and with the exception of Item E.9, which was pulled for discussion.

Page 7 of 590 ends

3 Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
E.1 Meeting Minutes of the City Council
Accepted Meeting Minutes of the City Council.

E.2 Meeting Minutes of the City Council Prior to December 19, 2024 Moved by: Tony Oerlemans, Council Member
Seconded by: Jovita Mendoza, Council Member
Accepted Meeting Minutes of the City Council Prior to December 19, 2024, with Council Member Maloney recusing herself as she was not in attendance prior to December 19, 2024.

Ayes (4): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, and Tony Oerlemans, Council Member Recused (1): Faye Maloney, Council Member
Motion Approved (4 to 0)
E.3 A Proclamation Recognizing June as Elder Abuse Awareness Month By Proclamation, recognized June as Elder Abuse Awareness Month.

E.4 A Proclamation Recognizing June as National Safety Month By Proclamation, recognized June as National Safety Month.

E.5 A Proclamation Recognizing June as Pride Month
By Proclamation, recognized June as Pride Month.

E.6 A Proclamation Recognizing June 5, 2025, as John Marsh Day By Proclamation, recognized June 5, 2025, as John Marsh Day.

Mayor Meyer and Council Member Oerlemans presented the
proclamation to Bob Jones.

E.7 GANN Limit
Approved Resolution 2025-52 adopting the 2025/26 Proposition 4 (1979) Appropriations Limit, or GANN Limit, using the change in State per capita income factor of 6.44% as the cost-of-living factor and the change in the City population factor of 0.603% to calculate the Limit.

E.8 Award an Agreement for civil engineering services with Freyer & Laureta, Inc. for the Zone 2 Reduced Water Pressure Zone Project, CIP Project No. 562-56411

Page 8 of 590 ends

4 Adopted Resolution 2025-53 approving and authorizing the City Manager or designee to execute an Agreement for civil engineering services with Freyer & Laureta, Inc. (“F&L”) in the amount of $99,900, plus funding authorization for a 10% contingency of $9,990, for a total not-to-exceed funding authorization amount of $109,890, for the Zone 2 Reduced Water Pressure Zone Project, CIP Project No. 562-56411 (“Project”).

CEQA work is ongoing and will be done concurrently with the design process.

E.9 Award of contract to Saboo Inc. for the Parking Garage Security and Safety Enhancements, CIP Project No. 337-37262
Allen Baquilar, Director of Engineering presented this item.

Moved by: Susannah Meyer, Mayor
Seconded by: Faye Maloney, Council Member
The Council, by motion, moved to pull Item E.9 and release the encumbered funds from the Parking Garage Security and Safety Enhancements Project, CIP Project No. 337-37262 (“Project”).

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
E.10 A Resolution adopting a List of Projects for submittal to the California Transportation Commission for Fiscal Year 2025/26 funded by SB 1:

The Road Repair and Accountability Act of 2017
Adopted Resolution 2025-54 adopting a List of Projects for submittal to the California Transportation Commission (“Commission”) for Fiscal Year (“FY”) 2025/26 funded by Senate Bill 1: The Road Repair and Accountability Act of 2017.

E.11 Considering actions pertaining to the annexation of the Orchard Grove North project into the City’s existing Landscape and lighting Assessment District No. 23-1 as Annexation No. 1
Adopted Resolution 2025-55 initiating and declaring the intention to annex the Orchard Grove North project into existing Landscape and Lighting Assessment District No. 23-1 (Orchard Grove) as Annexation No. 1; declaring the intention to levy and collect assessments; and setting the date of June 10, 2025, at 7:00 p.m. or at such time thereafter that the matter can be heard for the public hearing in accordance with the provisions of the Streets and Highways Code “Landscaping and Lighting Act of 1972” and California Proposition 218.

Page 9 of 590 ends

5 E.12 Resolution authorizing the execution of a Memorandum of Understanding with the Brentwood Senior Citizens Club
Adopted Resolution 2025-56 approving and authorizing the City Manager, or designee, to execute a Memorandum of Understanding (“MOU”) between the City of Brentwood and the Brentwood Senior Citizens Club, Inc., to support the delivery of a broad range of programs, activities, and services at the Brentwood Senior Activity Center (“BSAC”) and the Brentwood Community Center (“BCC”) through June 30, 2028. The Resolution also includes approval of a fee waiver for facility use for three (3) years during fiscal years 2025/26, 2026/27 and 2027/28, in an amount not to exceed $100,000 per fiscal year.

E.13 BART Park and Ride Letter of Opposition
Authorized the City Manager, or designee, to sign a Letter of Opposition to the Bay Area Rapid Transit (BART) Board of Directors requesting the continued use of the BART-owned parcel at 3980 Walnut Boulevard in Brentwood as a Park & Ride facility.

F. PUBLIC HEARINGS
F.1 Consideration of actions pertaining to the City’s Landscape and Lighting Assessment Districts, including Landscape and Lighting Assessment District No. 19-3 and No. 21-1, and the Citywide Park Maintenance District No. 98-1 for Fiscal Year 2025/26.

Vatsal Patel, Acting Parks and Recreation Director presented the item.

Mayor Meyer opened Public Hearings
There being no one wishing to speak, Council Member Mendoza moved to close the Public Hearing, seconded by Vice Mayor Pierson.

The motion carried unanimously with Council Member Maloney, Vice Mayor Pierson, Council Member Mendoza, Council Member Oerlemans and Mayor Meyer in favor.

Moved by: Jovita Mendoza, Council Member
Seconded by: Tony Oerlemans, Council Member
Adopted Resolution 2025-57 approving the City of Brentwood’s sixtyeight (68) Landscape & Lighting Assessment Districts (“LLADs”), Landscape & Lighting Assessment District No. 19-3, Landscape & Lighting Assessment District No. 21-1, and Citywide Park Maintenance District No. 98-1 Engineer’s Reports for Fiscal year 2025/26; ordering improvements; confirming the diagram and assessments; levying and collecting assessments; amending the Fiscal Year 2025/26 Operating Budget; and finding that the above actions are exempt from the California Environmental Quality Act.

Page 10 of 590 ends

6 Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
F.2 Public Hearing in Compliance with Assembly Bill 2561 / Government Code Section 3502.3 Regarding Vacancies, Recruitment, and Retention Efforts
Teresa Fairbanks, Acting Director of Human Resources, presented the item.

Mayor Meyer opened the Public Hearing.

There being no one wishing to speak, Council Member Mendoza moved to close the Public Hearing, seconded by Council Member Oerlemans.

The motion carried unanimously with Council Member Maloney, Vice Mayor Pierson, Council Member Mendoza, Council Member Oerlemans and Mayor Meyer in favor.

G. BUSINESS ITEMS
G.1 Presentation and discussion of the proposed 2026 ballot measure to renew the County Urban Limit Line, with possible direction to staff Erik Nolthenius, Planning Manager and Will Nelson, Contra Costa County Advanced Planning Principal Planner, presented the item.

Mayor Meyer opened public comments.

The City Clerk's office received 11 written comments in opposition to the item from: Robert Chuck, Shane & Michelle Ambrosino, Vince Ambrosino, Krystal Mendoza, Evelia Hernandez, Josh Dizon, David West, Brook Rogers, Kimberly Christian, Martiza Diaz, and Carolina Villaseca.

Jana and Taylor Schofield spoke in opposition to moving the Urban Limit Line.

There being no additional speakers, Mayor Meyer closed public comments.

Moved by: Pa'tanisha Pierson, Vice Mayor
Seconded by: Jovita Mendoza, Council Member
The Council, by motion, provided the following direction:
 that staff provide comments to the County prior to June 2, 2025, advising the County that the City of Brentwood is not interested in any expansion of the Urban Limit Line as it relates strictly to the City of Brentwood; and

Page 11 of 590 ends

7  that the City of Brentwood supports the County's offering to contract the Urban Limit Line over the water district facility; and  that the City of Brentwood requests to have the County notify the City of any requests outside our sphere of influence; and  that staff submit to the County all of the public comments received relating to the Urban Limit Line.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
G.2 Additional consideration of whether tattoo studios should be allowed in the Downtown
Eric Nolthenius, Planning Manager, presented the item.

Mayor Meyer opened public comments.

The City Clerk's office received 20 written comments in support of the item from: Ally Meza, Angelica Perez, Ashley Mitchell, Danielle Mitchell, Danny Sullivan, Kathrin Sullivan, Elissa Foote, Jamison Hamot, Kayla Hamot, Katrina Rothwell-Horner, Kiersten Walker, Lee Anne Hable, Lisa Horton, Louie Jweinat, Liz Krantz, Mia Pokrywka, Nicole RodriguezMontgomery, Lynn Tei, Jody Gianni, and Romeo Ysmael.

Gene, Kyle Hable, Lane Weeks, Joe Townzen, Scarlett, Angelica Gonzalez-Perez, Beth, Estrella Juarez, Chris Juarez, Sadie, Amy Noak, Ryan Gillis, Ian Dennis, Jody Gianni, Mia P., and Kayla provided comments in support of allowing tattoo shops in downtown Brentwood.

There being no additional speakers, Mayor Meyer closed public comments.

Council recessed at 10:11 p.m.

Council reconvened in Open Session at 10:22 p.m.

Moved by: Pa'tanisha Pierson, Vice Mayor
Seconded by: Tony Oerlemans, Council Member
The Council, by motion, directed staff to amend the Downtown Specific Plan to allow tattoo parlors as a permitted use, subject to an Administrative Design Review. As part of this review, applicants must provide proof of compliance with California Health and Safety Code Section 119300 the Safe Body Art Act, which establishes minimum statewide health and safety standards.

Page 12 of 590 ends

8 Ayes (3): Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Noes (2): Jovita Mendoza, Council Member, and Susannah Meyer, Mayor
Motion Approved (3 to 2)
G.3 Award of Contract to Conti LLC for the City Facility Audiovisual System Upgrade Project, CIP Project # 337-37259; amending the 2024/25 – 2028/29 Capital Improvement Program (CIP); and amending the FY 2024/25 Operating Budget
Mike Baria, Chief Information Officer, presented this item.

Mayor Meyer opened public comments
There being no one wishing to speak, Mayor Meyer closed public comments.

Moved by: Faye Maloney, Council Member
Seconded by: Tony Oerlemans, Council Member
Adopted Resolution 2025-58 1) approving the contract documents, awarding the bid, and authorizing the City Manager or designee to execute a contract and necessary documents, for the City Facility Audiovisual System Upgrade Project, CIP Project No. 337-37259 to Conti LLC, as the lowest responsive bidder in the amount of $962,961.19, plus funding authorization for a 10% contingency amount of $96,296.12, for a total funding authorization not to exceed amount of $1,059,257.31; 2) amending the 2024/25 – 2028/29 Capital Improvement Program (CIP); and 3) amending the FY 2024/25 Operating Budget for the associated project funding transfer.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
G.4 Receive Water Supply Options Study and Provide Guidance Item G.4 was continued to be brought back to Council at a later date uncertain.

G.5 Provide the City Council with requested information related to increasing the Affordable Housing Ordinance’s 13% obligation Sylvia Elias, Senior Analyst, presented the item.

Mayor Meyer opened public comments.

There being no one wishing to speak, Mayor Meyer closed public comments.

Page 13 of 590 ends

9 Moved by: Jovita Mendoza, Council Member
Seconded by: Pa'tanisha Pierson, Vice Mayor
The Council, by motion, directed staff to update the City’s inclusionary affordable housing percentage requirement to a total of 18%, allocating the percentage requirements as 9% Moderate-Income Households, 5% Low-Income Households, and 4% Very Low-Income Households. The Council further directed that a feasibility study will not be required at this time.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)
H. REQUEST FOR FUTURE AGENDA ITEMS - NEW REQUEST(S)
There were no new future agenda items requested by Council.

I. ADJOURNMENT
Moved by: Jovita Mendoza, Council Member
Seconded by: Pa'tanisha Pierson, Vice Mayor
The Council, by motion, moved to adjourn at 11:18 p.m.

Ayes (5): Jovita Mendoza, Council Member, Susannah Meyer, Mayor, Pa'tanisha Pierson, Vice Mayor, Tony Oerlemans, Council Member, and Faye Maloney, Council Member
Motion Approved (5 to 0)

Page 14 of 590 ends

PROCLAMATION
WHEREAS, Juneteenth, observed annually on June 19th, commemorates the day in 1865 when enslaved African Americans in Galveston, Texas, were informed of their freedom—more than two years after the signing of the Emancipation Proclamation; and
WHEREAS, Juneteenth represents a significant milestone in American history and a continued call to recognize and address the legacy of slavery, inequality, and systemic injustice; and
WHEREAS, the City of Brentwood honors the profound contributions of African American individuals and communities who have enriched our culture, strengthened our democracy, and advanced the cause of civil rights; and WHEREAS, Juneteenth is a day for reflection, education, and celebration, serving as a powerful reminder of the resilience, perseverance, and triumph of the human spirit; and
WHEREAS, Brentwood is committed to fostering a more inclusive, equitable, and just community for all its residents.

NOW, THEREFORE, BE IT PROCLAIMED that the City Council of the City of Brentwood does hereby recognize the 19th day of June 2025 as

JUNETEENTH
and encourages all residents to honor this historic day through acts of learning, community engagement, and celebration.

Dated this 10th day of June, 2025
Susannah Meyer, Mayor

Page 15 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.3
06/10/2025
SUBJECT: Adopt the City of Brentwood Local Roadway Safety Plan DEPARTMENT: Engineering
STAFF: Allen Baquilar, Director of Engineering/City Engineer Anju Pillai, Engineering Manager

TITLE/RECOMMENDATION
Adopt a Resolution adopting the City of Brentwood Local Roadway Safety Plan.

The project is exempt from the California Environmental Quality Act (CEQA) in accordance with CEQA Section 15262.

FISCAL IMPACT
The total cost of the Local Roadway Safety Plan (LRSP) prepared by Kimley-Horn and Associates, Inc., was $47,950. The cost of the LRSP is included in the 2024/25 General Fund Operating Budget.

BACKGROUND
Federal regulations require that each state have a Strategic Highway Safety Plan (SHSP). A SHSP is a statewide data-driven traffic safety plan that coordinates the efforts of a wide range of organizations to reduce traffic accident fatalities and serious injuries on all public roads. In coordination with federal, state, local, and private sector safety stakeholders, the SHSP establishes goals, objectives, and challenge areas of traffic safety.

While the SHSP is used as a statewide approach for improving roadway safety, a Local Road Safety Plan (LRSP) is a means for providing local and rural road owners with an opportunity to identify and address unique highway safety needs in their jurisdictions while contributing to the success of the SHSP. The LRSP offers a proactive approach to address safety needs and demonstrates the City’s responsiveness to safety challenges.

Along with all of the other cities in Contra Costa County, staff has prepared an LRSP (Attachment 2) to establish a framework and process for identifying, analyzing, and

Page 16 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.3
06/10/2025
prioritizing roadway safety improvements on City streets. The LRSP is a localized data-driven plan that provides opportunities to address unique roadway safety needs and reduce the number of fatal and severe injury collisions on roadways within the City of Brentwood. The LRSP also provides a toolbox of countermeasures to address the safety patterns to improve safety at key locations. These countermeasures can be incorporated in future projects to address traffic safety.

The LRSP or its equivalent must be updated and validated at least every five years.

The City will then go through the similar process to review crash data, engage with stakeholders and identify new traffic challenge areas and develop recommendations.

Adoption of an LRSP (or equivalent document) is a minimum requirement to be eligible for multiple transportation grants, such as the Highway Safety Improvement Program (HSIP) and the Safe Streets and Roads for All (SS4A), that fund projects that reduce or eliminate roadway fatalities and injuries. Eligible projects include those that provide safety improvements at both signalized and non-signalized intersections, pedestrian/bike projects and other roadway safety improvements.

Contra Costa Transportation Authority (CCTA) has prepared a Countywide Comprehensive Transportation Safety Action Plan (CCTSAP). The CCTSAP is intended to support scoping and multi-jurisdiction bundled applications for competitive grant funding application opportunities. The CCTSAP incorporates the LRSPs of each of the jurisdictions throughout Contra Costa County. After review by its Planning Committee on December 5, 2024, the CCTA Board approved the CCTSAP on December 18, 2024 (Attachment 3), with an ability to incorporate revisions thereafter.

CCTA has a contract commitment with Metropolitan Planning Commission (MTC), the funding grantor, to incorporate the countywide LRSPs into the CCTSAP by June 30, 2025, which will also include the City of Brentwood’s adopted LRSP. This incorporation of the City’s LRSP into the CCTSAP will ensure that the City’s efforts to promote road safety are recognized on a regional level and will give the City an advantage when applying for grant funding to implement local and cross-jurisdictional safety projects.

CITY COUNCIL STRATEGIC INITIATIVE
Focus Area 1: Public Works, Goal 1 Transportation: Proactively engage and collaborate with regional transportation agencies and stakeholders to facilitate the safe and efficient movement of people and goods

Page 17 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.3
06/10/2025

PREVIOUS ACTION
Not Applicable.

DATE OF NOTICE
Not Applicable.

ENVIRONMENTAL DETERMINATION
The project involves a planning study for possible future actions, which the City has not approved, adopted, or funded and does not require the preparation of an EIR or negative declaration but does require consideration of environmental factors.

Therefore, the City finds that the project is exempt from the California Environmental Quality Act (CEQA) in accordance with CEQA Section 15262.

ALTERNATIVE OPTION(S)

1. Do not approve staff’s recommendation.

2. Modify staff’s recommendation based on legally defensible findings.

ATTACHMENT(S)

1. Previous Action

2. Resolution

3. City of Brentwood Local Roadway Safety Plan Final Report

4. CCTA Resolution 21-40-G, as amended

Page 18 of 590 ends

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On June 25, 2024, by Resolution No. 2024-73, the City Council adopted a Resolution adopting the 2024/25 – 2025/26 Operating Budget, which includes funding for the Local Roadway Safety Plan (LRSP) of $47,950.

Page 19 of 590 ends

RESOLUTION NO. 2025-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

BRENTWOOD ADOPTING THE CITY OF BRENTWOOD LOCAL

ROADWAY SAFETY PLAN
WHEREAS, Federal regulations require that each State have a Strategic Highway Safety Plan (SHSP); and
WHEREAS, a SHSP is a statewide data-driven traffic safety plan that coordinates the efforts of a wide range of organizations to reduce traffic accident fatalities and serious injuries on all public roads; and WHEREAS, in coordination with federal, state, local, and private sector safety stakeholders, the SHSP establishes goals, objectives, and challenge areas of traffic safety; and
WHEREAS, while the SHSP is used as a statewide approach for improving roadway safety, a Local Road Safety Plan (LRSP) is a means for providing local and rural road owners with an opportunity to address unique highway safety needs in their jurisdictions while contributing to the success of the SHSP; and WHEREAS, along with all of the other Cities in Contra Costa County, Brentwood City staff has prepared a LRSP to establish a framework and process for identifying, analyzing, and prioritizing roadway safety improvements on City streets; and
WHEREAS, the LRSP is a localized data-driven traffic safety plan that provides opportunities to address unique roadway safety needs and reduce the number of fatal and severe injury collisions on roadways within the City of Brentwood; and
WHEREAS, the LRSP also provides a toolbox of countermeasures to address the safety patterns to improve safety at key locations and these countermeasures can be incorporated in future projects to address traffic safety; and WHEREAS, the LRSP or its equivalent must be updated and validated at least every five years; and
WHEREAS, adoption of LRSP (or equivalent document) is a minimum requirement to be eligible for multiple transportation grants such as the Highway Safety Improvement Program (HSIP) and the Safe Streets and Roads for All (SS4A),

Page 20 of 590 ends
Page 2 of 3 ends

that targets projects intended to reducing and eliminating roadway fatalities and injuries, including but not limited to safety improvements at signalized and nonsignalized intersections, pedestrian/bike projects and roadway safety improvements; and
WHEREAS, Contra Costa Transportation Authority (CCTA) has prepared a Countywide Comprehensive Transportation Safety Action Plan (CCTSAP); and WHEREAS, the CCTSAP is intended to support scoping and multi-jurisdiction bundled applications for competitive grant funding application opportunities to efficiently apply a Safe Systems Approach to achieve the Countywide Vision Zero policy of achieving zero fatal and severe injuries due to traffic collisions; and WHEREAS, the CCTSAP incorporates the LRSPs of each of the jurisdictions throughout Contra Costa County; and
WHEREAS, after review by its Planning Committee on December 5, 2024, the CCTA Board approved the CCTSAP on December 18, 2024, with an ability to incorporate revisions thereafter; and
WHEREAS, CCTA has a contract commitment with Metropolitan Planning Commission (MTC), the funding grantor, to incorporate the countywide LRSPs by June 30, 2025, which will also include the City of Brentwood’s adopted LRSP; and WHEREAS, this incorporation of the City LRSP into the CCTSAP will ensure that the City’s efforts to promote road safety are recognized on a regional level and will give the City an advantage when applying for grant funding to implement local and cross-jurisdictional safety projects; and
WHEREAS, the total cost of the LRSP prepared by Kimley-Horn and Associates, Inc., was $47,950; and
WHEREAS, the cost of the LRSP is included in the 2024/25 General Fund Operating Budget; and
WHEREAS, the LRSP involves a planning study for possible future actions which the City has not approved, adopted, or funded and does not require the preparation of an EIR or negative declaration but does require consideration of environmental factors. Therefore, the City finds that the project is exempt from the California Environmental Quality Act (CEQA) in accordance with CEQA Section 15262.

Page 21 of 590 ends
Page 3 of 3 ends

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood does hereby adopt the City of Brentwood Local Roadway Safety Plan.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 10th day of June 2025 by the following vote:

Page 22 of 590 ends

LOCAL ROADWAY SAFETY PLAN

CITY OF BRENTWOOD
Prepared for:

City of
Brentwood
Prepared by:

Page 23 of 590 ends

City of Brentwood LRSP ii May 2025

FINAL REPORT

CITY OF BRENTWOOD

LOCAL ROADWAY SAFETY PLAN (LRSP)
Prepared for:

City of Brentwood
Engineering Department
150 City Park Way,
Brentwood, California 94513
(925) 516-5420
Prepared by:

Kimley-Horn and Associates, Inc.
555 Capitol Mall, Suite 300
Sacramento, California 95814
(916) 858-5800
This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.

May 2025

Page 24 of 590 ends

City of Brentwood LRSP iii May 2025

ACKNOWLEDGEMENTS
The City of Brentwood’s employees and partners were instrumental in the development, review, and refinement of this LRSP. The City of Brentwood and Kimley-Horn would like to express their appreciation to the supporting staff and partners for their participation and contributions.

City of Brentwood
Anju Pillai (Engineering Manager)
Allen Baquilar (Director of Engineering/City Engineer)
Aman Grewal (Associate Engineer)
Michael Maanao (Police Sergeant)
External Agency Stakeholders
Aaron McAlister (Deputy Fire Chief)
Kristen Jobb (Director, Student Services)
Ron Alderman (Lead Electrician – Traffic Signals)
Community Stakeholders
Norm Cohen (Brentwood Bicycle and Pedestrian
Advisory Committee (BPAC))
Consultant Team (Kimley-Horn)
Robert Paderna, P.E., RSP1
Zachary Ramalingam, EIT
Zander Dally, AICP

STATUTORY NOTICE
23 U.S.C. § 409: US Code - Section 409: Discovery and admission as evidence of certain reports and surveys
Notwithstanding any other provision of law, reports, surveys, schedules, lists, or data compiled or collected for the purpose of identifying, evaluating, or planning the safety enhancement of potential accident sites, hazardous roadway conditions, or railway- highway crossings, pursuant to sections 130, 144, and 148 of this title or for the purpose of developing any highway safety construction improvement project which may be implemented utilizing Federal-aid highway funds shall not be subject to discovery or admitted into evidence in a Federal or State court proceeding or considered for other purposes in any action for damages arising from any occurrence at a location mentioned or addressed in such reports, surveys, schedules, lists, or data.

Page 25 of 590 ends

City of Brentwood LRSP iv May 2025

TABLE OF CONTENTS

1. INTRODUCTION .....................................................................................................................10

1.1. Document Organization ...............................................................................................10

2. VISION, GOAL, AND OBJECTIVES ..............................................................................................12

3. PROCESS .............................................................................................................................14

3.1. Guiding Manuals..........................................................................................................14

3.1.1. Local Roadway Safety: A Manual for California’s Local Road Owners ..................14

3.1.2. Highway Safety Manual .....................................................................................15

3.2. Analysis Techniques ....................................................................................................16

4. STAKEHOLDER ENGAGEMENT...................................................................................................17

5. PUBLIC OUTREACH................................................................................................................18

6. REVIEW OF PLANNING DOCUMENTS..........................................................................................23

7. DATA SOURCES.....................................................................................................................24

7.1. Roadway Network........................................................................................................24

7.2. Intersections ...............................................................................................................24

7.3. Crashes.......................................................................................................................24

8. SAFETY TRENDS ....................................................................................................................25

8.1. Brentwood KSI Crashes Compared to Statewide KA Crashes.........................................25

8.2. California OTS Rankings for Brentwood.........................................................................26

8.3. Severity Level...............................................................................................................26

8.4. Annual Crashes ...........................................................................................................31

8.5. Crash Causes ..............................................................................................................32

8.6. Crash Types.................................................................................................................33

8.7. Lane Departure Crashes ..............................................................................................35

8.8. Aggressive and Impaired Driving Crashes......................................................................35

8.8.1. Aggressive Driving Crashes................................................................................36

8.8.2. Impaired Driving Crashes ..................................................................................37

8.9. Non-Motorized Crashes ...............................................................................................40

8.9.1. Bicycle Crashes ................................................................................................40

8.9.2. Pedestrian Crashes ...........................................................................................40

9. DEMOGRAPHIC AND SOCIOECONOMIC ASSESSMENT...................................................................43

9.1. Framework ..................................................................................................................43

9.1.1. Federal Policies.................................................................................................43

9.1.2. State Policies ....................................................................................................43

9.2. Methodology................................................................................................................44

9.2.1. Underserved Communities................................................................................44

9.3. Demographic and Socioeconomic Assessment ............................................................47

9.4. Crash Data Equity Review ............................................................................................53

10. RECOMMENDATIONS..............................................................................................................55

10.1. Engineering Countermeasures ..................................................................................55

Page 26 of 590 ends

City of Brentwood LRSP v May 2025

10.1.1. Crash Modification Factors .............................................................................55

10.1.2. Engineering Countermeasures Toolbox ...........................................................55

10.1.3. High-Severity Crash Locations ........................................................................59

10.2. Non-Infrastructure Countermeasures .......................................................................61

11. EVALUATION AND IMPLEMENTATION..........................................................................................63

11.1. Evaluation ................................................................................................................63

11.2. Implementation........................................................................................................63

11.2.1. Near- and Mid-Term Focus Areas ....................................................................63

11.3. Funding....................................................................................................................64

11.3.1. Highway Safety Improvement Program (HSIP)..................................................64

11.3.2. Safe Streets and Roads for All (SS4A)...............................................................64

11.3.3. Caltrans Active Transportation Program (ATP)..................................................64

11.3.4. State Transportation Improvement Program (STIP)...........................................65

11.3.5. California SB 1................................................................................................65

11.3.6. California OTS Grants .....................................................................................65

11.3.7. ABAG Regional Funding Programs ...................................................................66

12. NEXT STEPS..........................................................................................................................67

Page 27 of 590 ends

City of Brentwood LRSP vi May 2025

LIST OF APPENDICES
Appendix A Intersection Network Screening Results
Appendix B Segment Network Screening Results
Appendix C Public Comments
Appendix D Summary of Programs, Policies, and Practices for the City of Brentwood

LIST OF FIGURES
Figure 1 — Brentwood LRSP Stakeholder Meeting........................................................................17 Figure 2 — Social Pinpoint Public Comments..............................................................................19 Figure 3 — Summary of Feedback Received via Social Pinpoint....................................................20 Figure 4 — Safety Issues Survey (East Sub-Region)......................................................................21 Figure 5 — Crashes by Severity (2019 - 2023)...............................................................................27 Figure 6 — Citywide KSI Crashes (2019-2023) .............................................................................29 Figure 7 — Citywide Crashes (2019-2023)...................................................................................30 Figure 8 — Annual Crashes (2019 – 2023)....................................................................................31 Figure 9 — Annual KSI Crashes (2019 – 2023)..............................................................................31 Figure 10 — Total Crashes by Cause (2019 – 2023) ......................................................................32 Figure 11 — KSI Crashes by Cause (2019 – 2023).........................................................................33 Figure 12 — Crashes by Type (2019– 2023)..................................................................................34 Figure 13 — KSI Crashes by Type (2019 – 2023)............................................................................35 Figure 14 — Aggressive and Impaired Driving Crashes .................................................................36 Figure 15 — Aggressive Driving Crash Map ..................................................................................38 Figure 16 — Impaired Driving Crash Map.....................................................................................39 Figure 17 — Bicycle and Pedestrian Crashes...............................................................................40 Figure 18 — Non-Motorized Crash Map.......................................................................................42 Figure 19 — City of Brentwood 2020 Population by Age and Sex ...................................................44 Figure 20 — Brentwood Disadvantaged Communities (DACs) Census Tracts ...............................46 Figure 21 — Collision Victim Demographics by Race/Ethnicity in the City of Brentwood................47 Figure 22 — Types of Disabilities.................................................................................................48

Page 28 of 590 ends

City of Brentwood LRSP vii May 2025
Figure 23 — Mode Share in Brentwood........................................................................................49 Figure 24 — Severe and Fatal Crashes in the City of Brentwood ...................................................50 Figure 25 — Bike and Pedestrian Collisions in the City of Brentwood............................................51 Figure 26 — All Collisions in the City of Brentwood ......................................................................52 Figure 27 — Crash Victims by Gender .........................................................................................53 Figure 28 — Crash Victims by Gender and Age ............................................................................53 Figure 29 — Vulnerable Road User Crashes by Type of Violation ..................................................54 Figure 30 — CMF Calculation .....................................................................................................55

LIST OF TABLES
Table 1 — Historical Trends: Brentwood KSI Crashes Compared to Statewide KSI Crashes...........25 Table 2 — Brentwood OTS Ranking (2022)...................................................................................26 Table 3 — KSI Crashes by Facility Type........................................................................................27 Table 4 — Crashes by Severity (2019 – 2023) ...............................................................................28 Table 5 — Brentwood Engineering Countermeasures Toolbox .....................................................56 Table 6 – High-Severity Crash Locations......................................................................................59 Table 7 - Countermeasures for Selected Case Study Locations....................................................60 Table 8 — Brentwood Non-Infrastructure Countermeasures Toolbox ...........................................62

Page 29 of 590 ends

City of Brentwood LRSP viii May 2025

LIST OF ACRONYMS AND TERMINOLOGY
AASHTO American Association of State Highway and Transportation Officials ABAG Association of Bay Area Governments
ATP Active Transportation Program
ARIDE Advance Roadside Impaired Enforcement
CA MUTCD California Manual on Uniform Traffic Control Devices CalEPA California Environmental Protection Agency
Caltrans California Department of Transportation
CEJST Climate and Economic Justice Screening Tool
CMAQ California Mitigation and Air Quality
CMF Crash Modification Factor
CRF Crash Reduction Factor
CTC California Transportation Commission
DAC Disadvantaged Communities
DEV Daily Entering Volume
DRE Drug Recognition Expert
EO Executive Order
EPDO Equivalent Property Damage Only
FAST Fixing America’s Surface Transportation
FHWA Federal Highway Administration
GIS Geographic Information System
HSIP Highway Safety Improvement Program
HFST High Friction Surface Treatment
HSM Highway Safety Manual
IIP Interregional Improvement Program
ITIP Interregional Transportation Improvement Program
KSI Fatal and Severe Injury Crashes
LRSP Local Roadway Safety Plan
LRSM Local Roadway Safety Manual

Page 30 of 590 ends

City of Brentwood LRSP ix May 2025
MEV Million Entering Vehicles
NEV Neighborhood Electric Vehicle
NHTSA National Highway Traffic Safety Administration
PD Police Department
PDO Property Damage Only
RRFB Rectangular Rapid Flashing Beacon
RIP Regional Improvement Program
RSTP Rural Surface Transportation Program
RTIP Regional Transportation Improvement Program
R/W Right-of-Way
SARC School Accountability Report Card
SB Senate Bill
SHSP Strategic Highway Safety Plan
SRTS Safe Routes to School
SS4A Safe Streets and Roads for All
STIP State Transportation Improvement Program
SWITRS Statewide Integrated Traffic Records System
TCAS Traffic Collision Analysis System (Draft)
TDM Transportation Demand Model
TIMS Transportation Injury Mapping System
US ACS United States Census American Community Survey
VMT Vehicle Miles Traveled

Page 31 of 590 ends

City of Brentwood LRSP 10 May 2025

1. INTRODUCTION
This Local Roadway Safety Plan (LRSP) identifies factors associated with the most prevalent vehicle crashes occurring in the City and proposes matching countermeasures to reduce or eliminate those crashes. This report identifies emphasis areas to inform and guide further safety evaluation of the City’s transportation network. The emphasis areas include the type of crash, certain locations, and notable relationships between current efforts and crash history. The LRSP analyzes crash data on an aggregate basis as well as at specific locations to identify high-crash locations, high-risk locations, and city-wide trends and patterns. The analysis of crash history throughout the City’s transportation network allows for the following opportunities:
 Identify factors in the transportation network that inhibit safety for roadway users of all modes of travel.
 Improve safety at high-crash locations and locations which experience a disproportionately high number of fatal and severe injury crashes.
 Develop safety measures aligning with the California Strategic Highway Safety Plan (SHSP) Five Es of safety: Engineering, Enforcement, Education, Emergency Services, and Emerging Technologies, to encourage safer driver behavior and more favorable severity outcomes.

The process and analysis performed for the City’s LRSP includes a summary of vision and goals, crash history analysis, the establishment of emphasis areas, an equity assessment, a countermeasure toolbox, and a set of policy recommendations. The information compiled will provide a foundation for decision making and prioritization of safety countermeasures and projects that enhance safety equitably for all modes of travel within the City. The expanded implementation section will provide guidance to the City on applying for grant funding from various safety programs.

The intent of the LRSP is to:
 Create a greater awareness of road safety and risks
 Reduce the number of fatal and severe-injury crashes
 Develop lasting partnerships
 Provide support for grant funding opportunities
 Aid in the prioritization of investments in traffic safety

1.1. Document Organization
The LRSP is organized into the following sections:
 Section 1 presents an introduction to the LRSP.
 Section 2 presents the vision, goal, and objectives for the LRSP.  Section 3 presents the LRSP development process including guidance documents and analysis techniques.
 Section 4 presents the project stakeholders.
 Section 5 reviews City planning documents and policies.  Section 6 contains the LRSP data sources.
 Section 7 provides a summary of safety trends.
 Section 8 includes the City’s crash data equity analysis.  Section 9 includes recommended engineering and non-infrastructure countermeasures.

Page 32 of 590 ends

City of Brentwood LRSP 11 May 2025
 Section 10 summarizes the evaluation and implementation of the safety countermeasures.  Section 11 identifies next steps.
Appendices

Page 33 of 590 ends

City of Brentwood LRSP 12 May 2025

2. VISION, GOAL, AND OBJECTIVES
The Brentwood LRSP evaluates the transportation network as well as non-infrastructure programs and policies within the City. Mitigation measures are evaluated using criteria to analyze the safety of road users (drivers and passengers, bicyclists, and pedestrians), the interaction of modes, influences on the roadway network from adjacent municipalities, and the potential benefits of safety countermeasures. This effort utilizes historical data to identify trends and develop a toolbox of countermeasures applicable to conditions in the City that can be used for proactive identification and implementation of opportunities, without relying solely on a reaction and response to crashes as they occur.

The Federal Highway Administration (FHWA) maintains a list of Proven Safety Countermeasures. The list currently has 20 Proven Safety Countermeasures, and LRSPs are included on the list of 20 Proven Safety Countermeasures. Implementation of LRSPs has improved safety in local jurisdictions across the country by providing a guide for local jurisdictions to systematically address the conditions that lead to fatal and severe-injury crashes. They provide a locally developed and customized roadmap to directly address the most common safety challenges in the given jurisdiction. Following discussions with Brentwood staff and a review of existing plans and policies for the area, the following Vision, Goals, and Objectives have been established for this project.

Vision: Support the California vision of moving towards significantly reducing fatalities and severe injuries for all road users.

Goal Objectives
Goal 1: Identify areas with a high risk for
crashes.
• Evaluate the City’s roadway network for
crash activity.
• Identify intersections and segments in
need of mitigation.
• Identify areas of interest with respect to
safety concerns for pedestrians and
bicycles.

Goal 2: Illustrate the value of a comprehensive
safety program and the systematic process.
• Demonstrate the systematic process’
ability to identify locations with higher
risk for crashes based on present
characteristics closely associated with
severe crashes.
• Demonstrate, through the systematic
process, the gaps and data collection
activities that can be improved upon.

Page 34 of 590 ends

City of Brentwood LRSP 13 May 2025
Goal 3: Define safety improvements for the
near-, mid- and long-term, including projects
for HSIP, SS4A and other programs with
funding consideration.
• Create the outline for a prioritization
process that can be used in forthcoming funding cycles. • Demonstrate the correlation between
the proposed safety countermeasures
with the Vision Zero Initiative and the
California State Highway Safety Plan
(SHSP).

Goal 4: Identify emphasis areas to prioritize
countermeasure application.
• Use systematic crash analysis to
identify emphasis areas.
• Prioritize emphasis areas for
countermeasure development.
• Align emphasis areas with City goals &
objectives.
• Align emphasis areas with current City
areas of concern.

Goal 5: Proposed List of Conceptual Priority
Projects for Implementation of
Countermeasures.
• Identify conceptual priority projects for
implementation.
• Identify similar areas where
countermeasures can be
implemented.
• Prioritize these countermeasures for
implementation based on cost, effort,
and timeline.

Page 35 of 590 ends

City of Brentwood LRSP 14 May 2025

3. PROCESS
The primary goal for the City of Brentwood and their safety partners is to provide safe, sustainable, and efficient mobility choices for their residents and visitors. Through the development and implementation of this LRSP, the City will continue its collaboration with safety partners to identify and discuss safety issues within the community.

Guidance on the LRSP process is provided at both the national (FHWA) and state (Caltrans) level, and both agencies have developed a general framework of data and recommendations for an LRSP.

The FHWA encourages:
 The establishment of a working group (Stakeholders) to participate in developing a LRSP  The review of crash, traffic, and roadway data to identify areas of concern  The establishment of goals, priorities, and countermeasures to recommend improvements at spot locations, systemically, and comprehensively
Caltrans guidance follows a similar outline with the following steps:

1. Establish leadership

2. Analyze the safety data

3. Determine emphasis areas

4. Identify strategies

5. Prioritize and incorporate strategies

6. Evaluate and update the LRSP
This LRSP documents the results of data and information obtained, including the vision, goals, and objectives for the LRSP; existing safety efforts; crash analyses; emphasis areas; the City’s existing countermeasure toolbox; and potential countermeasures for select priority locations. The development of the LRSP recommendations considers the Five Es of traffic safety defined by the California SHSP: Engineering, Enforcement, Education, Emergency Response, and Emerging Technologies throughout its process.

3.1. Guiding Manuals
The following section describes the analysis process undertaken to evaluate safety within the City at a systemic level. Using a network screening process, locations within the City that will most likely benefit from safety enhancements were identified. Using historic crash data, crash risk factors for the entire network are derived. The outcomes will inform the identification and prioritization of engineering and non-infrastructure safety countermeasures that address certain roadway characteristics and related behaviors that contribute to motor vehicle crashes as well as active transportation users.

This process uses the latest national and state best practices for statistical roadway analysis described in the following sections.

3.1.1. Local Roadway Safety: A Manual for California’s Local Road Owners The purpose of Local Roadway Safety: A Manual for California’s Local Road Owners (Version 1.7, April 2024) (LRSM) is to encourage local agencies to pursue a proactive approach to identifying and analyzing safety issues, while positioning themselves to be eligible for competitive federal, state,

Page 36 of 590 ends

City of Brentwood LRSP 15 May 2025
and local grant programs for project implementation funding opportunities. A proactive approach is defined as analyzing the safety of the entire roadway network through either a one-time, network wide analysis, or by routine analyses of the roadway network.

According to the LRSM, “The California Department of Transportation (Caltrans) – Division of Local Assistance is responsible for administering California’s federal safety funding intended for local safety improvements.”
To provide the most benefit and to be competitive for grant funding, the analysis leading to countermeasure selection should focus on both intersections and roadway segments and be considerate of roadway characteristics and traffic volumes. The result should be a list of locations that are most likely to benefit from the implementation of cost-effective countermeasures, preferably prioritized by benefit/cost ratio. The LRSM suggests using a mixture of quantitative and qualitative measures to identify and rank locations that consider both crash frequency and crash rates. These findings should then be screened for patterns such as crash types and severity to aid in the determination of issues causing higher numbers of crashes and the potential countermeasures that could be most effective. Qualitative analysis should include field visits and a review of existing roadway characteristics and devices. The specific roadway context can then be used to assess what conditions may increase safety risk at the site and systematic level.

Countermeasure selection should be supported using Crash Modification Factors (CMFs). These factors are the peer reviewed product of before-and-after research that quantifies the expected rate of crash reduction that can be expected from a given countermeasure. If more than one countermeasure is under consideration, the LRSM provides guidance on how to apply CMFs appropriately.

3.1.2. Highway Safety Manual
The American Association of State Highway and Transportation Officials (AASHTO) Highway Safety Manual (HSM), published in 2010, presents a variety of methods for quantitatively estimating crash frequency or severity at a variety of locations. This four-part manual is divided into Parts: A) Introduction, Human Factors, and Fundamentals, B) Roadway Safety Management Process, C) Predictive Method, and D) Crash Modification Factors.

Chapter 4 of Part B of the HSM discusses the network screening process. The network screening process is a tool for an agency to analyze their entire network as well as identify and rank locations that (based on the implementation of a countermeasure) are most to realize a reduction in the frequency of crashes.

The HSM identifies five steps in this process:

1. Establish Focus: Identify the purpose or intended outcome of the network screening process. This decision will influence data needs, the selection of performance measures and the screening method that can be applied.

2. Identify Network and Establish Reference Populations: Specify the types of sites or facilities being screened (i.e. segments, intersections, or geometrics) and identify groupings of similar sites or facilities.

3. Select Performance Measures: There are a variety of performance measures available to evaluate the potential to reduce crash frequency at a site. In this step, the performance measure is selected as a function of the screening focus and the data and analytical tools available.

Page 37 of 590 ends

City of Brentwood LRSP 16 May 2025

4. Select Screening Method: There are three screening methods described in this chapter:
ranking, sliding window, and peak searching. Each method has advantages and disadvantages; the most appropriate method for a given situation should be selected.

5. Screen and Evaluate Results: The final step in the process is to conduct the screening and analysis and evaluate the results.

The HSM provides several statistical methods for screening roadway networks to identify high risk locations based on overall crash histories.

3.2. Analysis Techniques
Intersections and roadways were analyzed using four crash metrics:
 Number of Crashes
 Equivalent Property Damage Only (HSM Ch. 4)
The initial steps of the crash analysis established sub-populations of roadway segments and intersections that have similar characteristics. For this LRSP, intersections were grouped by their control type (signalized and unsignalized) and segments by their roadway category (arterial, collector, minor collector, and local). Individual crash rates were calculated for each subpopulation. The sub-population level crash rates were then used to assess whether a specific location has more or fewer crashes than expected. These sub-populations were also used to determine typical crash patterns to help identify locations where unusual numbers of specific crash types are occurring.

The network screening process ranks intersections and roadway segments by the number of crashes that occurred at each one over the analysis period and then identifies areas that had more of a given type of crash than would be expected for that type of location. The crash type factors were:
 Crash severity - fatal, severe injury, other visible injury, complaint of pain, and property damage only (PDO)
 Crash type - broadside, rear-end, sideswipe, head-on, hit object, overturned, bicycle, pedestrian, and other
 Environmental factors – lighting and wet roads
 Driver behavior - impaired, aggressive, and distracted driving From the results of the network screening analyses, a short-list of locations was chosen based on crash activity, crash severity, crash patterns, location type, and area within the City to provide the greatest variety of locations covering the widest range of safety opportunities for countermeasure toolbox development. The intent is to populate the safety countermeasure toolbox with mitigation measures that will be applicable to most of the crash activity in the City.

The EPDO method is described in the Highway Safety Manual. This method assigns weighting factors to crashes based on injury level to develop a property damage only score. In this analysis, the injury crash costs were calculated for each location based on the latest Caltrans injury costs. This value is then divided by the injury cost for a property damage only crash. The resulting number is the equivalent number of property damage only crashes at each site. This value allows all locations to be compared based on injury crash costs. (HSM, Chapter 4).

The results of the network screening analysis for both intersections and roadway segments is presented in Appendix A and Appendix B, respectively.

Page 38 of 590 ends

City of Brentwood LRSP 17 May 2025

4. STAKEHOLDER ENGAGEMENT
As part of the LRSP development, project stakeholders were identified and included in the process to ensure the local perspective was kept at the forefront of this planning effort. A stakeholder group comprised of staff from various City and County departments as well as key community members was formed. A complete list is available in the acknowledgements on page iii.

These stakeholders were called together to offer insight on the safety issues present in the City’s transportation network. The stakeholder group met on April 22, 2025 to review the results of the network screening and crash data analysis, provide comments, and ask questions.

Figure 1 — Brentwood LRSP Stakeholder Meeting

Page 39 of 590 ends

City of Brentwood LRSP 18 May 2025

5. PUBLIC OUTREACH
Figure 2 presents a map of the public comments received on the interactive map via Social Pinpoint.

Contra Costa Transportation Authority (CCTA) is preparing a Countywide Comprehensive Transportation Safety Action Plan (CCTSAP). As part of this plan, CCTA received public comments through Social Pinpoint for the East County subregion. The CCTSAP project also held a tabling event at a Farmers’ Market in Brentwood in late September 2022 that encouraged residents to provide comments along with a discussion with the project team of common issues in Brentwood. In total, 41 comments on the interactive map and 33 survey responses were collected through Social Pinpoint.

Page 40 of 590 ends

City of Brentwood LRSP 19 May 2025
Figure 2 — Social Pinpoint Public Comments

Page 41 of 590 ends

City of Brentwood LRSP 20 May 2025
Figure 3 — Summary of Feedback Received via Social Pinpoint

Page 42 of 590 ends

City of Brentwood LRSP 21 May 2025
Most of the East Sub-Region survey responses and comments focused on walking and transit as a main topic, with some comments surrounding other related issues. There was a large concern related to schools and crossings/crosswalks. Figure 4 presents some of the safety issues identified in the survey responses for the East sub-region. The top five safety issues that the Eastern sub-region mentioned were pedestrian safety, speeding drivers, intersection safety, unsafe routes to school, and bicycle safety.

Figure 4 — Safety Issues Survey (East Sub-Region)
0 5 10 15 20 25 30 35
Large Trucks
Street Sideshows
Lighting
Not Enough Separation Between Modes
Pavement Conditions
Unsafe Hazard
Stop Sign/Red Light Violations
Visibility
Bicycle Safety
Unsafe Route to School
Intersection Safety
Speeding Drivers
Pedestrian Safety
What are some of the safety issues you face in this area?

Page 43 of 590 ends

City of Brentwood LRSP 22 May 2025
Online Social Pinpoint comments received within the East Sub-region were largely focused within Brentwood. Some of the most popular comments heard within the East Sub-region can be found below. A list of all the comments received in the City of Brentwood are found in Appendix C.

Top East Sub-Region Comments

1. “I feel like this intersection should have a light that once a cycle all cars stop and it lets all 4 crosswalks go at the same time. This would seriously cut down on who gets to go when. It so frustrating as a pedestrian but even more so as a driver.” 3 upvotes. [McClarren Rd and Griffith Ln]

2. “The cross walk to go to Brentwood Elementary school is extremely dangerous during drop off every single morning. Need a cross guard and cops. Everyone is always running stop signs and in a rush. Only a matter of time when someone is severely injured.” 3 upvotes. [Brentwood Elementary School]

3. “Trail is on both sides of Lone Tree, but with a stop light only down the way without good path access to the light and too little protection for bikes and pedestrians from such a busy road.” 2 upvotes. [Lone Tree Way and Trail Xing West of Anderson Ln]

4. “4-way crosswalk, only 2 ways protected by a crossing guard during school hours. Heavy traffic at all 4 corners. I have personally almost been hit while walking with my children on the unprotected side of the crosswalk and have witnessed children, walking on their own, almost being hit. The drivers are paying most of their attention to the crossing guard, so the unprotected crosswalks drivers rush through. I have also witnessed the crossing guard while stopping traffic, almost be hit by cars.” 2 upvotes. [McClarren Rd and Griffith Ln]

5. “4-way crossing for students walking/biking to school unsafe from all corners.” 2 upvotes. [McClarren Rd and Griffith Ln]

Page 44 of 590 ends

City of Brentwood LRSP 23 May 2025

6. REVIEW OF PLANNING DOCUMENTS
Existing plans, policies, and projects that were recently completed, planned, or are on-going within the City were compiled at the start of the LRSP process in order to gain perspective on the existing efforts for transportation-related improvements within the City. High-level key points regarding transportation improvements and safety-related topics were identified to inform decision making in this LRSP. The following plans and documents were reviewed:
Capital Improvement Programs, 2020, 2021, 2022, 2023, 2024 City of Brentwood General Plan, 2014
 Parks, Trails, and Recreation Master Plan, 2002
 Parks, Trails, and Recreation Master Plan Update, 2019 City of Brentwood Emergency Operations Plan, 2013
Contra Costa Countywide Vision Zero Action Plan, 2022
Contra Costa Transportation Authority Countywide Transportation Plan (CTP): East County Action Plan, 2023
Contra Costa County Active Transportation Plan
The City of Brentwood seeks to improve roadway safety by implementing the Safe System Approach. The Safe System Approach, as defined in the Caltrans SHSP, is built upon the following principles1
:
• Death and serious injuries are unacceptable
• Humans make mistakes
• Humans are vulnerable
• Responsibility is shared
• Safety is proactive
• Redundancy is crucial
While engineering countermeasures are a critical part of preventing fatal and severe injury crashes, the City also recognizes that policy plays a key role in safety as well. The city performed a literature review of relevant policies and programs to identify other means by which the Safe System Approach and road safety could be further established.

Appendix C presents a summary of local programs, policies, and practices as well as considerations of how they can be improved or enhanced to further support and prioritize road safety.
1 2020-2024 SHSP – Jan 2023 (PDF), Caltrans. January 2023. dot.ca.gov/-/media/dotmedia/programs/safety-programs/documents/shsp/2023-shsp-full-report-2020-2024-a11y.pdf Source: What Is a Safe System
Approach? USDOT 2022.

Page 45 of 590 ends

City of Brentwood LRSP 24 May 2025

7. DATA SOURCES
The following data was obtained from the City for use in crash data analysis.

7.1. Roadway Network
The crash analysis, which is described in detail in Section 3, requires each corridor within the City to be classified. The City’s roadway network obtained directly from the City was categorized using FHWA’s roadway classification system provided in the roadway network. The roadway network classification was assigned to each corridor roadway segment as either a major arterial, minor arterial, collector, or local road. This was done in order to compare the functional design and capacity to better stratify analysis results, only comparing roadway segment safety performance with similar peer roadways (i.e., only arterials are compared to arterials, etc.) within the City.

7.2. Intersections
The crash analysis also requires each intersection within the City to be classified by control type.

Intersections throughout the City were classified by control type as either signalized or unsignalized (including roundabouts). The safety analysis also only compares intersection safety performance with similar control types (i.e., signalized intersections are only compared to signalized intersections, etc.) within the City.

7.3. Crashes
Injury collision data for the most recent five-year period (January 1, 2019 through December 31, 2023) was used for the collision analysis. Using data from the past five-year period is sufficient to identify potential trends in crashes by location and types, while not being so long as to have data that would include long-term technology and cultural changes. The collision data was obtained from UC Berkeley’s SafeTrek Transportation Injury Mapping System. Collision records were allocated to intersection and the roadway network segments.

Knowing the impacts of the crash (the injuries or type of damage which occurred) is a key part of assessing the environment and safety factors around the site of the crash. The TIMS dataset used for this analysis categorizes crashes in the following categories:
• 1 – Fatality
 2 – Severe injury
 3 – Other Visible Injury
 4 – Complaint of Pain
Property damage only or “fender bender” crashes that did not result in any forms of injury are not included in this dataset. This LRSP includes crashes which occurred on the City’s roadway network (including intersections which border City limits). However, crashes along Highway 4 were not included as these belong to Caltrans right-of-way and are outside the jurisdiction of the City of Brentwood. It should be noted that though crashes along Highway 4 are not included in this study, the Contra Costa County Fire Protection District (CCCFPD) is a key stakeholder in the development of this LRSP and is responsible for responding to incidents along Highway 4. CCCFPD’s ability to respond to crashes on Highway 4 is dependent upon the City’s local roadway network and can be impacted by congestion or crashes on local roads.

Page 46 of 590 ends

City of Brentwood LRSP 25 May 2025

8. SAFETY TRENDS
The following sections contain the results of the analysis process which included evaluation of Brentwood fatal and severe injury (KSI) crashes compared to statewide levels, among other evaluations including crashes by severity level, cause, pedestrian, and bicycle crashes.

8.1. Brentwood KSI Crashes Compared to Statewide KA Crashes The California SHSP focuses on 16 challenge areas identified by the SHSP Executive Leadership and Steering Committees after an in-depth analysis of California KSI crash data as well as an extensive statewide outreach process that involved hundreds of diverse traffic safety partners around the state. Collisions can be attributed to 13 of the 16 challenge areas. Table 1 presents a summary of City’s historic challenge areas (2013-2022) by comparing KSI crashes to the statewide KSI crashes.

The City of Brentwood was higher than the statewide average in the following eight areas: Aggressive Driving, Impaired Driving, Intersections, Lane Departure, Young Drivers (15-20), Aging Drivers (≥65), Distracted Driving, and Occupant Protection.

Table 1 — Historical Trends: Brentwood KSI Crashes Compared to Statewide KSI Crashes California SHSP Challenge
Area
Brentwood
Comparison to
Statewide
Percentages
Percent of Fatal and Severe Injury
Crashes (2013-2022)
Differential
Brentwood
Percentages
Statewide
Percentages
Aggressive Driving Higher 51.2% 33.4% 17.8%
Impaired Driving Higher 33.1% 23.9% 9.1%
Intersections Higher 32.2% 24.3% 7.9%
Lane Departure Higher 49.6% 42.1% 7.5%
Young Drivers Higher 17.4% 12.1% 5.2%
Aging Drivers Higher 16.5% 12.8% 3.7%
Distracted Driving Higher 5.8% 4.4% 1.4%
Occupant Protection Higher 13.2% 13.1% 0.1%
Bicyclists Lower 6.6% 7.3% -0.7%
Work Zones Lower 0.8% 1.6% -0.7%
Commercial Vehicles Lower 4.1% 6.7% -2.5%
Motorcyclists Lower 14.0% 20.8% -6.7%
Pedestrians Lower 6.6% 18.9% -12.3%
Source: Statewide Integrated Traffic Records System (2013 – 2022).

Driver Licensing is based on crash data from the Fatality Analysis Reporting Service (FARS) (2013 – 2022).

Note: Percentages will not add up to 100%, as a fatality or severe injury could have involved multiple Challenge Areas (i.e., a young driver that was impaired and unrestrained).

Page 47 of 590 ends

City of Brentwood LRSP 26 May 2025

8.2. California OTS Rankings for Brentwood
The California OTS publishes annual reports ranking agencies of similar population by their crash profile. Table 2 presents the City of Brentwood’s 2022 (the most recent) OTS rankings. OTS notes that “Number 1 in the rankings is the highest, or ‘worst’” 2 . Compared to other cities of similar
population, Brentwood ranks among the top 50 in Total Fatal and Injury Crashes. Additionally, Brentwood ranks among the Top 50 for crashes involving Drivers under the Influence (< 35), Bicyclists, Composite crashes, Speed Related crashes, Nighttime crashes (9PM-2:59AM), Hit and Run crashes, and DUI Arrests.

Table 2 — Brentwood OTS Ranking (2022)
Crash Category Victims Killed or Injured OTS Ranking
Total Fatal and Injury 167 26/104
Alcohol Involved 14 59/104
Had Been Drinking Driver < 21 1 48/104
Had Been Drinking Driver 21 – 34 8 44/104
Motorcycles 7 54/104
Pedestrians 8 85/104
Pedestrians < 15 1 70/104
Pedestrians 65+ 0 98/104
Bicycle 16 23/104
Bicyclist < 15 4 28/104
Composite 93 29/104
Crash Category Fatal or Injury Crashes OTS Ranking
Speed Related 38 10/104
Nighttime (9:00pm – 2:59am) 19 27/104
Hit and Run 13 42/104
Type Of Arrests Arrests OTS Ranking
DUI Arrests 76 49/104

8.3. Severity Level
Over the observed five-year time period, there were a total of 636 crashes, 8 of which were fatal and 60 of which resulted in severe injuries, as shown in Figure 5. Nearly two-thirds of all crashes (63.1%) resulted in other visible injuries.
2 City of Brentwood OTS Crash Rankings Results, California Office of Traffic Safety. Accessed March 2025. https://www.ots.ca.gov/rankings/brentwood-2022/

Page 48 of 590 ends

City of Brentwood LRSP 27 May 2025
Figure 5 — Crashes by Severity (2019 - 2023)
UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 Eighty-three percent of crashes in the City occurred at intersections, with nearly half of all crashes (43%) occurring at signalized intersections. Table 3 presents the distribution of all crashes, and especially KSI crashes across the City’s various facility types (signalized intersections, unsignalized intersections, and roadway segments). Fifty-one percent of all KSI crashes occurred at unsignalized intersections, followed by 33.8% signalized intersections and 14.7% at roadway segments.

Table 3 — KSI Crashes by Facility Type
Facility Type Total Crashes Percentage KSI Crashes Percentage Signalized
Intersections 276 43.40% 23 33.82%
Unsignalized
Intersections 255 40.09% 35 51.47%
Roadway
Segments 105 16.51% 10 14.71%
Total 636 100% 68 100%
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 Total: 8
Total: 60
Total: 401
Total: 167
0 50
100
150
200
250
300
350
400
450
Fatal Severe Injury Other Visible Injury Complaint of Pain Signalized Intersections Unsignalized Intersections Roadway Segments

Page 49 of 590 ends

City of Brentwood LRSP 28 May 2025
Table 4 presents the distribution of all crashes by severity across the City’s facility types. Crashes were more common at signalized intersections, followed by unsignalized intersections and roadway segments.

Table 4 — Crashes by Severity (2019 – 2023)
Severity
Signalized
Intersections
Unsignalized
Intersections
Roadway
Segments Total
Crashes % Crashes % Crashes % Crashes %
Fatal 2 0.3% 4 0.6% 2 0.3% 8 1.3%
Severe 21 3.3% 31 4.9% 8 1.3% 60 9.4%
Other Visible Injury 166 26.1% 165 25.9% 70 11.0% 401 63.1% Complaint of Pain 87 13.7% 55 8.6% 25 3.9% 167 26.3%
Total 276 43.4% 255 40.1% 105 16.5% 636 100.0%
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

Page 50 of 590 ends

City of Brentwood LRSP 29 May 2025
Figure 6 — Citywide KSI Crashes (2019-2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

Page 51 of 590 ends

City of Brentwood LRSP 30 May 2025
Figure 7 — Citywide Crashes (2019-2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

Page 52 of 590 ends

City of Brentwood LRSP 31 May 2025

8.4. Annual Crashes
Figure 8 presents the number of annual crashes on roads in the City of Brentwood beginning in 2019.

The year with the most crashes was 2019, with a total of 150 crashes. Annual crashes trended downwards in the years leading up to the COVID-19 pandemic, with 2020 having the least number of crashes. Annual crashes have generally trended upwards since 2020.

It is likely that the COVID-19 pandemic influenced crash trends in 2020 and 2021. In 2020, the number of daily household trips decreased due to widespread shelter-in-place orders; fewer vehicles on the road could be connected to fewer vehicle conflicts and thus fewer crashes. However, reduced roadway volumes and congestion could also be connected to increased vehicle speeds, a phenomenon that numerous law enforcement agencies have reported. As volumes returned to “prepandemic” levels in 2021, law enforcement agencies in California anecdotally noted that vehicle speeds remained high; it is theorized that this pandemic-era aggressive driving behavior has persisted and is partially contributing to the increase in annual crashes than can be seen since 2020.

Figure 8 — Annual Crashes (2019 – 2023)
Figure 9 — Annual KSI Crashes (2019 – 2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 150
101
126 126 133
0 20
40 60
80 100
120
140
160
2019 2020 2021 2022 2023
Total Linear (Total)
14 11
14 10
19 0
5 10
15 20
2019 2020 2021 2022 2023
Total Linear (Total)

Page 53 of 590 ends

City of Brentwood LRSP 32 May 2025

8.5. Crash Causes
As shown in Figure 10, the most frequently identified crash causes were Unsafe Speeds, Improper Turning, and Traffic Signals and Signs. Crash causes that accounted for less than two percent are not pictured in the figure.

Figure 10 — Total Crashes by Cause (2019 – 2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 Unsafe Speed,
186, 29%
Improper Turning,
140, 22%
Traffic Signals and
Signs, 98, 15%
Automobile Right
of Way, 72, 11%
Driving or Bicycling
Under the Influence of
Alcohol or Drug, 41, 6%
Unknown, 20, 3%
Pedestrian Right of Way, 17, 3%
Pedestrian Violation, 11, 2% Other, 51, 8%

Page 54 of 590 ends

City of Brentwood LRSP 33 May 2025
The most common crash causes for KSI crashes include improper turning, unsafe speed and DUIs as show in Figure 11. Crash causes which accounted for more than one crash are presented in Figure 11. Improper turning is related to vehicles turning when or where it is unsafe to do so; these crashes mostly included hit-object crashes, bicycles, broadsides and sideswipes.

Figure 11 — KSI Crashes by Cause (2019 – 2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

8.6. Crash Types
According to reported data, approximately 636 injury crashes occurred within the City during the fiveyear study period on city owned and maintained roadways. Figure 12 indicates that broadsides and rear ends were the most common crash type within the City, followed by hit-object crashes. A large proportion of rear ends occurred at signalized intersections, while broadsides occurred most commonly at unsignalized intersections. The most common crash type along roadway segments was rear ends.

Improper Turning,
16, 25%
Unsafe Speed, 12,
19%
DUI, 10, 16%
Traffic Signals and
Signs, 9, 14%
Pedestrian
Violation, 5, 8%
Automobile Right
of Way, 4, 6%
Pedestrian Right of Way, 4, 6%
Other Hazardous Violation, 2, 3% Unknown, 2, 3%

Page 55 of 590 ends

City of Brentwood LRSP 34 May 2025
Figure 12 — Crashes by Type (2019– 2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 The most common crash types which resulted in fatal and severe injuries were broadsides and hitobject crashes, followed by crashes involving vulnerable road users (Figure 13). Though crashes involving vulnerable road users (bicycles and pedestrians) accounted for 15% of all crashes, they accounted for a disproportionately higher percentage (29%) of all KSI crashes. 13 34 24 11 11 6 2
Total: 7 Total: 5 Total: 2
77 92
22 22 21 22
16 70
34 35
30 27 26
27 0
20 40
60 80
100
120
140
160
180
Broadside Rear End Hit Object Sideswipe Head On Bike Ped Other Overturned Not Stated Segment Signalized Intersections Unsignalized Intersections

Page 56 of 590 ends

City of Brentwood LRSP 35 May 2025
Figure 13 — KSI Crashes by Type (2019 – 2023)
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 Note: The crash marked as “Other” involved a single-vehicle incident where a motorcyclist lost control and crashed.

8.7. Lane Departure Crashes
Caltrans defines crashes involving lane departure as those with crash types listed as ‘Head-On’, ‘HitObject’, or ‘Overturned’. This also includes instances where a vehicle runs off the road or crosses into the opposing lane prior to the crash. There were 145 lane departure crashes over the study period in the City, with an average of approximately 29 lane departure crashes per year. Of the 145 lane departure crashes, 4 were fatal, 19 were reported with severe injuries, 95 with other visible injuries, and 27 with complaints of pain.

8.8. Aggressive and Impaired Driving Crashes
Figure 14 summarizes aggressive and impaired driving crashes by intersections and segments.

Additional information is included in the following sections. 2 4
1 2
1 8 4
2 4
2 3
5 7
8 5
5 4
1 0
2 4
6 8
10 12
14 16
Broadside Hit Object Ped Bike Head On Rear End Sideswipe Overturned Other Segment Signalized Intersections Unsignalized Intersections

Page 57 of 590 ends

City of Brentwood LRSP 36 May 2025
Figure 14 — Aggressive and Impaired Driving Crashes
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

8.8.1. Aggressive Driving Crashes
Aggressive driving includes primary collision factors such as unsafe speed, following too closely and violations related to traffic signals and signs. There were 291 aggressive driving crashes between 2019-2023. One of the crashes resulted in fatalities and twenty-one resulted in severe injuries.

Figure 15 illustrates the aggressive driving crashes within the City. A list of intersection segments of in order of the highest to lowest number of crashes due to aggressive driving is shown below:
• Balfour Rd & Summerset Dr to Fairview Ave
• O’Hare Ave & Sand Creek Rd to Town Center Terrace
A list of the intersections in order ofthe highest to lowest number of crashes due to aggressive driving is shown below:
• Sand Creek Rd and O'Hara Ave
• Balfour Rd and Cortona Way/Eagle Rock Way
• Sand Creek Rd and Shady Willow Ln
• Balfour Rd and Claremont Dr
Balfour Rd and Sellers Ave
41 11
171
10 79
20 Total: 291
Total: 41
0 50
100
150
200
250
300
350
Aggressive Impaired
Segment Signalized Unsignalized

Page 58 of 590 ends

City of Brentwood LRSP 37 May 2025

8.8.2. Impaired Driving Crashes
Impaired driving crashes include all crashes where there was evidence of drug or alcohol use by the driver. Drivers do not need to exceed the legally defined threshold of intoxication to be counted, as Caltrans considers any level of alcohol consumption to have the potential to impact driver responsiveness and decision making. There were 41 impaired driving crashes between 2019-2023, three of which resulted in a fatality and seven of which resulted in severe injuries. Figure 16 depicts the impaired driving crashes within the City. The intersection segment Sand Creek Rd & Fairview Ave to Sandstone Dr was the one segment with a crash due to impaired driving. A list of the intersections in order of the highest to lowest number of crashes due to impaired driving is shown below:
• Lone Tree Way & Brentwood Blvd
• Grant St & Empire Ave
• Grant St & Fairview Ave
• Balfour Rd & Armstrong Way
• Balfour Rd & Rosegate Ave
• Remington St & Walnut Blvd
• Walnut Blvd & McClaren Rd
• Spruce St & Garin Pkwy

Page 59 of 590 ends

City of Brentwood LRSP 38 May 2025
Figure 15 — Aggressive Driving Crash Map
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

Page 60 of 590 ends

City of Brentwood LRSP 39 May 2025
Figure 16 — Impaired Driving Crash Map
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

Page 61 of 590 ends

City of Brentwood LRSP 40 May 2025

8.9. Non-Motorized Crashes
There were a total of 54 crashes involving bicycles and 45 crashes involving pedestrians, as shown in Figure 17 and Figure 18, respectively. Bicycle and pedestrian crashes were most common at intersections, particularly at unsignalized intersections.

Figure 17 — Bicycle and Pedestrian Crashes
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023 Figure 18 illustrates the locations of pedestrian and bicycle crashes at intersections within the City.

Additional information on pedestrian and bicycle crashes is in the following sections.

8.9.1. Bicycle Crashes
There were 48 bicycle-involved crashes in the City over the study period. Of the bicycle-involved crashes, 9 were reported with severe injuries, 35 with visible injuries, and 10 with complaints of pain.

The severe injury bicycle crashes occurred at the following locations:
• Sand Creek Rd & Las Montanas St
• Sand Creek Rd and Minnesota Ave
• Minnesota Ave & Valley Green Dr
• Brentwood Blvd & Central Ave
• Lone Tree Way & Ohara Ave (2)
• Lone Tree Way & Double K Rd
• Medallion Dr & Europena Dr
• Spyglass Dr between Augusta Dr and Monterey Ct

8.9.2. Pedestrian Crashes
Over the study period of 2019-2023, a total of 42 pedestrian-involved crashes occurred in the City.

Of the pedestrian-involved injury crashes, 2 crashes were fatal, 9 were reported with severe injuries, 26 were reported with other visible injuries, and 5 with complaints of pain. 2 5
15 18
25 25
Total: 42
Total: 48
0 10
20 30
40 50
60 Pedestrian Bicycle
Segment Signalized Unsignalized

Page 62 of 590 ends

City of Brentwood LRSP 41 May 2025
The fatal pedestrian crashes occurred at the following intersections:
• Brentwood Blvd & Harvest Dr
• Vineyards Pkwy & Solera St
The severe injury pedestrian crashes occurred at the following locations:
• Brentwood Blvd & Maple St
• Griffith Ln & Continente Ave
• Sand Creek Rd & Brentwood Blvd
• Griffith Ln & Shannon Dr
• Blue Bird Ln & Ohara Ave
• Brentwood Blvd & Fir St
• Lone Tree Way & Empire Ave
• Rutherford Circle & Garland Way
• Jennifer St & Garin Pkwy

Page 63 of 590 ends

City of Brentwood LRSP 42 May 2025
Figure 18 — Non-Motorized Crash Map
Source: UC Berkeley SafeTrek Transportation Injury Mapping System 2019-2023

Page 64 of 590 ends

City of Brentwood LRSP 43 May 2025

9. DEMOGRAPHIC AND SOCIOECONOMIC ASSESSMENT
This LRSP includes a citywide demographic and socioeconomic analysis to better understand how different population groups in the City of Brentwood are impacted by road safety. The framework used to guide the analysis is followed by a summary of the methodology. The equity analysis considers demographics and collisions, followed by general takeaways related to the equity and safety data. The analysis seeks to inform policy and program recommendations for the City in accordance with state and federal equity goals, with the objective of promoting equitable infrastructure investments which will enhance road safety for all road users.

9.1. Framework
This section applies a socioeconomic and demographic approach to the safety analysis conducted for the LRSP to supplement the technical collision data analysis by identifying any correlations between equity and safety data, in accordance with federal and state guidelines. This ensures that vulnerable and disadvantaged populations can benefit from additional safety considerations.

Meeting the needs of equity populations is a critical step in equitable distribution of resources and outcomes. As such, the equity analysis aims to summarize key safety and equity findings.

9.1.1. Federal Policies
Equity analysis in transportation planning became solidified by two key federal policies: Title VI of the Civil Rights Act of 1964 and Executive Order (EO) 12898 in 1994. Title VI of the Civil Rights Act of 1964 prohibits discrimination on the basis of race, color, or national origin in programs and activities receiving federal financial assistance. EO 12898 directs all federal agencies to develop an Environmental Justice Strategy that, “identifies and addresses the disproportionately high and adverse human health or environmental effects of its programs, policies, and activities on minority populations and low-income populations.” Both policies mandate transportation agencies to identify, address, and serve disadvantaged communities through their work.

More recently in 2021, EO 14008 was signed establishing Justice40 with the goal that 40 percent of the overall benefits of certain federal investments flow to disadvantaged communities that are marginalized, underserved, and overburdened by pollution. Previously published Justice40 tract maps and tools, specifically the recently archived US DOT Equitable Transportation Community (ETC) Explorer, were utilized in the equity analysis to identify disadvantaged communities. Although the US DOT ETC Explorer has been recently archived, the dataset is critical in identifying historically disadvantaged communities.

9.1.2. State Policies
California SB 535 (2012) directs investments of cap-and-trade funds towards “Disadvantaged Communities” (DACs). The SB 535 DAC Map (2022) was established to identify DACs throughout the state of California.

The equity analysis conducted as part of the LRSP initiated with an analysis of the 2022 California Environmental Protection Agency (CalEPA) SB 535 DAC Map, a 2022 Justice40 tract map, the US DOT ETC Explorer, and the CEJST to determine if any tracts within the city were considered disadvantaged. The equity analysis identified four disadvantaged communities outlined in the

Page 65 of 590 ends

City of Brentwood LRSP 44 May 2025
recently archived US DOT ETC Explorer. See Figure 20 for Disadvantaged Communities (DACs) Census Tracts in the City of Brentwood.

9.2. Methodology
Equity demographics were analyzed to better understand the population. The equity analysis builds on the crash data analysis from the LRSP and forms the basis for the equity policy and program recommendations provided.

Demographic data for the city’s population was collected from the United States Census American Community Survey (US ACS) 5-year estimates for 2023 for total population by race/ethnicity, age, and income to identify equity communities within the city. Age was included in the demographic data to capture the city’s young and aging populations.

9.2.1. Underserved Communities
Brentwood is located within an urbanized area with a population of approximately 64,2923 as of 2020. Figure 19 displays the 2020 population in the City of Brentwood broken down by age and sex.

Figure 19 — City of Brentwood 2020 Population by Age and Sex Source: U.S. Census Bureau, 2020 DEC Demographic Profile for the City of Brentwood, Accessed April 2025 The US Department of Transportation (USDOT) has developed a list of SS4A Underserved Communities Census Tracts (historically disadvantaged communities). The disadvantaged census tracts identified in this list exceeded the 50th percentile (75th for resilience) across at least four of the following six transportation disadvantaged indicators. Each of the six disadvantage indicators are assembled at the census tract level using data from the Centre for Disease Control and 3 U.S. Census Bureau, Table DP1 Profile of General Population and Housing Characteristics 2020 DEC Demographic Profile, Available at
https://data.census.gov/table/DECENNIALDP2020.DP1?q=profile+brentwood+city&g=160XX00US0608142.

Page 66 of 590 ends

City of Brentwood LRSP 45 May 2025
Prevention (CDC) Social Vulnerability Index, Census American Community Survey, Environmental Protection Agency (EPA) Smart Location Map, US Department of Housing and Urban Development (HUD) Location Affordability Index, EPA Environmental Justice Screen, Federal Emergency Management Agency (FEMA) Resilience Analysis & Planning Tool, and FEMA National Risk Index.

1. Transportation Access disadvantage identifies communities and places that spend more, and longer, to get where they need to go (CDC Social Vulnerability Index, Census America Community Survey, EPA Smart Location Map, HUD Location Affordability Index).

2. Health disadvantage identifies communities based on variables associated with adverse health outcomes, disability, as well as environmental exposures (CDC Social Vulnerability Index).

3. Environmental disadvantage identifies communities with disproportionate pollution burden and inferior environmental quality (EPA EJ Screen).

4. Economic disadvantage identifies areas and populations with high poverty, low wealth, lack of local jobs, low homeownership, low educational attainment, and high inequality (CDC Social Vulnerability Index, Census America Community Survey, FEMA Resilience Analysis & Planning Tool).

5. Resilience disadvantage identifies communities vulnerable to hazards caused by climate change (FEMA National Risk Index).

6. Equity disadvantage identifies communities with a high percentile of persons (age 5+) who speak English "less than well" (CDC Social Vulnerability Index).

Page 67 of 590 ends

City of Brentwood 2025 LRSP 46 May 2025
Figure 20 — Brentwood Disadvantaged Communities (DACs) Census Tracts Source: USDOT ETC Explorer, Accessed August 2024.

Page 68 of 590 ends

City of Brentwood LRSP 47 May 2025

9.3. Demographic and Socioeconomic Assessment
The City of Brentwood is home to a diverse population. This section reports on the demographics data of road users in Brentwood as collected from the US Census Bureau and processed by the Metropolitan Transportation Commission (MTC) Bay Area Vision Zero (BayVIZ) System. In terms of race and ethnicity, white people make up the largest population of crash victims by race/ethnicity in Brentwood at 48.8% and Hispanic or Latino origin account for 17.4% of crash victims. Persons of black heritage and other/unknown are overrepresented in fatal and severe injury crashes, accounting for 10.8% and 19.7% of fatal and severe injury crashes though they only account for 9% and 6.6% of the population, respectively. Figure 21 below provides a breakdown of populations by race and ethnicity and crash victims by race and ethnicity in Brentwood.

Figure 21 — Collision Victim Demographics by Race/Ethnicity in the City of Brentwood Source: Bay Area Vision Zero (BayVIZ) System, Fall 2023, Accessed April 2025 According to the 2023 American Community Survey, 29.2% of households in Brentwood speak a language other than English at home. Spanish is spoken in 13.0% of households; other IndoEuropean languages and Asian and Pacific Islander languages are spoken in 5.8% and 9.0% of households, respectively4
. In terms of age, approximately 15.1% of the population in Brentwood is 4 United States Census Bureau, Table S1601 Language Spoken at Home 2023 ACS 5-Year Estimates, Available at
https://data.census.gov/table/ACSST5Y2023.S1601?q=Language+Spoken+at+Home&g=010XX00US_160XX 00US0608142.

Page 69 of 590 ends

City of Brentwood LRSP 48 May 2025
65 years and older, and 26.1% of the population is under 18 years old5. Approximately 10.6% of the population in Brentwood is disabled6
. Figure 22 presents a breakdown of the types of disabilities (there is overlap between categories).

Figure 22 — Types of Disabilities
Source: 2023 American Community Survey, City of Brentwood According to 2023 American Community Survey, approximately 2.1% of workers in Brentwood walk to work and 0.2% commute by bike7
. However, cyclist and pedestrians account for 29.5% of fatal and severe injury crashes recorded during the study period. Figure 23 presents the mode share of trips in Brentwood.
5 United States Census Bureau, Table S0101 Age and Sex 2023 ACS 5-Year Estimates, Available at https://data.census.gov/table/ACSST5Y2023.S0101?g=160XX00US0608142. 6 United States Census Bureau, Table S1810 Disability Characteristics 2023 ACS 5-Year Estimates, Available at https://data.census.gov/table/ACSST5Y2023.S1810?q=disability&g=160XX00US0608142. 7 United States Census Bureau, Table S0801 Commuting Characteristics by Sex 2023 ACS 5-Year Estimates, Available at https://data.census.gov/table/ACSST5Y2023.S0801?q=commuting&g=160XX00US0608142.

Page 70 of 590 ends

City of Brentwood LRSP 49 May 2025
Figure 23 — Mode Share in Brentwood
Source: BayVIZ 2025 and U.S. Census Bureau American Community Survey (ACS) 5-year 2019-2023 The City aims to increase the mode share for these active modes of transportation by making the City’s roadway network safer through infrastructure improvements, education, and community engagement. The options available to the City to improve its roadway network identified in the LRSP countermeasure toolbox will benefit residents, students, and individuals who travel across the City to access destinations. Implementing safety improvements will serve to mitigate disparity by increasing the safety for residents that commute via active transportation.

Approximately 19.1% of the total severe and fatal crashes in the City from 2019-2023 occurred within the disadvantaged communities. Figure 24 presents severe and fatal crashes citywide and within disadvantaged communities. Pedestrian and bicycle collisions in the disadvantaged communities account for approximately 35.7% of all citywide pedestrian and bicycle collisions. Figure 25 presents pedestrian and bicycle collisions citywide and within the disadvantaged communities from 2019-2023. Approximately 29.4% of all citywide injury collisions were located within disadvantaged communities from 2019-2023. Figure 26 presents all citywide collisions by severity and identifies the disadvantaged communities. The disadvantaged community census tracts account for approximately 22.7% of the land area within the City (approximately 2,155 acres of land is designated as a disadvantaged community within approximately 9,510 acres of city area) yet disproportionately experience more overall collisions and more pedestrian and bicycle collisions than the rest of the city.

Page 71 of 590 ends

City of Brentwood LRSP 50 May 2025
Figure 24 — Severe and Fatal Crashes in the City of Brentwood Source: TIMS Crash Data (2019 – 2023).

Page 72 of 590 ends

City of Brentwood LRSP 51 May 2025
Figure 25 — Bike and Pedestrian Collisions in the City of Brentwood Source: TIMS Crash Data (2019 – 2023).

Page 73 of 590 ends

City of Brentwood LRSP 52 May 2025
Figure 26 — All Collisions in the City of Brentwood
Source: TIMS Crash Data (2019 – 2023).

Page 74 of 590 ends

City of Brentwood LRSP 53 May 2025

9.4. Crash Data Equity Review
Crash victim demographics from the TIMS dataset were reviewed, particularly gender and age.

Figure 27 presents a breakdown of crashes by gender. From 2019-2023, approximately 48% of crash victims were female, 51% were male, and 1.1% were not stated.

Figure 27 — Crash Victims by Gender
Source: TIMS Crash Data, 2019-2023
Figure 28 presents a breakdown of crash victims by age. There were 87 crash victims of age 14 or younger, and 126 crashes where the victim(s) were ages 15-19. There were 213 crashes involving young drivers (age 19 or less). Over the study period, there were approximately 105 crashes where the crash victim was 65 years old or older.

Figure 28 — Crash Victims by Gender and Age
Source: TIMS Crash Data, 2019-2023

Page 75 of 590 ends

City of Brentwood LRSP 54 May 2025
Crash data from TIMS ranging from 2019-2023 was reviewed to determine the parties at fault in vehicle-pedestrian/bicycle crashes involving pedestrians and bicyclists and is presented in Figure

29. Approximately 82.8% of crashes involving vulnerable road users were due to driver violations.

The most common driver violations were improper turning (turning at a distance unnecessarily far from a curb, turning without using turn signals, or making a type of turn prohibited by signage) and pedestrian right of way violations (making a maneuver from a motor vehicle without respecting the right-of-way of a pedestrian) each account for approximately 17% of vulnerable user collisions.

Followed by traffic signals and signs (collision was caused by inadequate, inconsistent, and/or confusing signage) at 16% and automobile right of way (making a maneuver without respecting the right-of-way of another driver) at 14%. Six percent of crashes involving vulnerable road users were due to pedestrian violations, and 9% were not assigned fault. Pedestrian violations included the following: pedestrian failure to cross at crosswalks between adjacent traffic signal controlled intersections (1%), pedestrian failure to yield ROW when crossing outside of marked and unmarked crossings (4%), and pedestrian failure to follow “WALK” or “WAIT” or “DON’T WALK” signals (1%).

Figure 29 — Vulnerable Road User Crashes by Type of Violation Source: TIMS Crash Data, 2019-2023
Improper Turning
17%
Pedestrian Right of
Way, 17%
Traffic SIgnals and Signs
16%
Automobile Right of
Way 14%
Unknown
9%
Unsafe Speed
7%
Pedestrian Violation
7%
Wrong Side of
Road 4%
Other Improper Driving, 3%
Driving or Bicycling Under the Influence, 2%
Other Than Driver (or Pedestrian), 2%
Brakes, 1% Other Hazardous
Violation, 1%

Page 76 of 590 ends

City of Brentwood LRSP 55 May 2025

10. RECOMMENDATIONS
The following sections provide more information on potential engineering and non-infrastructure safety countermeasures that might address conditions that were observed to contribute to crash activity in the City.

10.1. Engineering Countermeasures
The following sections contain a description of Crash Modification Factors (CMFs) and Crash Reduction Factors (CRFs) associated with the engineering countermeasures toolbox.

10.1.1. Crash Modification Factors
When identifying potential systemic safety improvements, it is important to look at CMFs for the proposed improvements. The CMF Method is found in Part D of the HSM. CMFs are defined as the ratio of effectiveness of one condition in comparison to another condition and represent the relative change in crash frequency due to a change in one specific condition. Countermeasures with CMFs less than one are expected to reduce crashes if applied, while those countermeasures with CMFs greater than one are expected to increase crashes. Figure 30 illustrates the definition of CMFs.

Figure 30 — CMF Calculation
A Crash Reduction Factor (CRF) is similar to a CMF but stated in different terms. A CRF is defined as a percentage of crash reduction that might be expected after the implementation of a given countermeasure at a specific site. In application, the higher a CRF value is, the more effective the countermeasure is at preventing crashes. The countermeasures proposed in this LRSP were chosen because of their effectiveness in reducing crashes, especially those most commonly occurring in the City.

10.1.2. Engineering Countermeasures Toolbox
The systemic improvements identified as most likely effective to be for Brentwood are listed in Table 5, and include a wide range of countermeasures that can be implemented in phases where appropriate. Many of these proposed countermeasures have already been implemented in the City, including but not limited to pedestrian countdown signal heads, conversion of stop-controlled intersections to roundabouts, and installation of retro-reflective backplates on traffic signal heads.

The CMF indicates how effective the countermeasure is at reducing crashes. CMFs and CRFs have been provided for reference to aid the City of Brentwood in understanding potential reductions from crashes by different countermeasures. Caltrans funding levels for each countermeasure are also provided to aid the City in determining what the local match would likely be if the City were to pursue grant funding. Most countermeasures are eligible for Caltrans funding up to 90%, though some are lower.

Page 77 of 590 ends

City of Brentwood LRSP 56 May 2025
Table 5 — Brentwood Engineering Countermeasures Toolbox Countermeasure
Also Addresses
Crash Modification
Factor (CMF)
Crash Reduction
Factor (CRF)
CRF Applies to
Caltrans Funding Cost to Implement
Pedestrian Bicycle All Nighttime Pedestrian and
Bicycle
Signalized Intersections
Modify signal to provide a Leading Pedestrian Interval (LPI) X 0.4 60% X 90% $ Install Left Turn Lane, Add Left Turn Phase 0.45 55% X 90% $$$ Install High Friction Surface Treatment (HFST) 0.45 55% X 90% $$$ Install intersection lighting 0.6 40% X 90% $$
Pedestrian scramble X 0.6 40% X 90% $$
Curb extensions X 0.63 37% X N/A $$
Install pedestrian median fencing on approaches X 0.65 35% X 90% $$ Protected left turn phase 0.7 30% X 90% $$
Convert signal from pedestal-mounted to mast arm 0.7 30% X 90% $$$ Install signs with LED borders as advanced warning 0.7 30% X 90% $$ Install raised median on approaches 0.75 25% X 90% $$
Pedestrian countdown signal heads X 0.75 25% X 90% $
Signal ahead warning signs 0.85 15% X N/A $
Retroreflective backplates 0.85 15% X 90% $
Improve signal timing (coordination) 0.85 15% X 50% $$
Advanced stop bar before crosswalk and bicycle box X X 0.85 15% X 90% $ Install raised pavement markers and striping 0.9 10% X 90% $ Flashing yellow arrow 0.94 6% X N/A $
Convert intersection to roundabout (from signal) Varies Varies X 90% $$$ Convert intersection to mini/compact roundabout (from
signal) Varies Varies X 90% $$
Install a raised intersection X Not Available Not Available X N/A $$ Unsignalized Intersections
Install High Friction Surface Treatment (HFST) 0.55 55% X 90% $$$ Pedestrian Signal or Pedestrian High Intensity Activated Crosswalk (HAWK) X 0.45 55% X 90%
$$$
Install all-way STOP control 0.5 50% X 90% $
Directional median openings to restrict turning movements 0.5 50% X 90% $$ Reduced Left-Turn Conflict (R-CUT) intersections 0.5 50% X 90% $$$ Pedestrian refuge island X 0.55 45% X 90% $$
$$$ Requires design and construction of extensive infrastructure improvements $$ Requires procurement and/or minor construction activities $ Requires limited staff resources and can be implemented in-house with current engineering and/or maintenance staff

Page 78 of 590 ends

City of Brentwood LRSP 57 May 2025
Countermeasure
Also Addresses
Crash Modification
Factor (CMF)
Crash Reduction
Factor (CRF)
CRF Applies to
Caltrans Funding Cost to Implement
Pedestrian Bicycle All Nighttime Pedestrian and
Bicycle
Install splitter-islands on minor road approaches 0.6 40% X 90% $$ Crosswalk lighting X 0.6 40% X X 90% $$
Install splitter-islands on minor road approaches 0.6 40% X 90% $$ Add intersection lighting 0.6 40% X 90% $$
Colored bicycle lanes X 0.61 39% X 90% $
Curb extensions X 0.63 37% X N/A $$$
Install/upgrade pedestrian crossing with enhanced safety X 0.65 35% X 90% $$$ Rectangular Rapid Flashing Beacon (RRFB) X 0.65 35% X 90% $$ Install left-turn lane 0.65 35% X 90% $$
Install flashing beacons as advanced warning 0.7 30% X 90% (if beacons are utilized)
$$
Upgrade pavement markings 0.75 25% X 90% $
Install raised median on approaches 0.75 25% X 90% $$
Clear sight triangles 0.8 20% X 90% $
Install right-turn lane 0.8 20% X 90% $$
Install/upgrade intersection warning/regulatory signs 0.85 15% X 90% $ Install flashing beacons at stop-controlled intersections 0.85 15% X 90% $$ Convert intersection to roundabout Varies Varies X 90% $$$ Retroreflective strips on sign posts Not Available Not Available X 90% $ Install a raised intersection X Not Available Not Available X N/A $$$ Partial street closure or diagonal diverter Not Available Not Available X N/A $$ Full street closure X X Not Available Not Available X X N/A $$ Roadway Segments
Improve pavement friction (High Friction Surface Treatment) 0.45 55% X 90% $$$ Install chevron signs on horizontal curves 0.60 40% X 90% $ Remove or relocate fixed object outside of Clear Recovery Zone

0.65 35% X 90% $$$
Install pedestrian median fencing X X 0.65 35% X 90% $$ Install bike lanes X X 0.65 35% X 90% $
Add segment lighting 0.65 35% X 90% $$
Install/upgrade pedestrian crossing (with enhanced safety features) X X 0.65 35% X 90%
$$
Install raised pedestrian crossing X X 0.65 35% X 90% $$ $$$ Requires design and construction of extensive infrastructure improvements $$ Requires procurement and/or minor construction activities $ Requires limited staff resources and can be implemented in-house with current engineering and/or maintenance staff

Page 79 of 590 ends

City of Brentwood LRSP 58 May 2025
Countermeasure
Also Addresses
Crash Modification
Factor (CMF)
Crash Reduction
Factor (CRF)
CRF Applies to
Caltrans Funding Cost to Implement
Pedestrian Bicycle All Nighttime Pedestrian and
Bicycle
Install rectangular rapid flashing beacon X X 0.65 35% X 90% $$ Install curve advance warning signs (flashing beacon) 0.70 30% X 90% $$ Install dynamic/variable speed warning signs 0.70 30% X 90% $$ Install curve advance warning signs 0.75 25% X 90% $
Install impact attenuators 0.75 25% X 90% $$
Install centerline rumble strips/stripes 0.80 20% X 90% $$ Install edge line rumble strips/stripes 0.85 15% X 90% $$ Install/Upgrade signs with new fluorescent sheeting
(regulatory/warning) 0.85 15% X 90% $
Install delineators, reflectors and/or object markers 0.85 15% X 90% $ Speed feedback signs (mobile or fixed) X X Not Available Not Available X Opportunity for OTS funding
$$
Install lane narrowing treatments (extend curb inward/extend median) X Not Available Not Available X N/A $$
Install a chicane, deviation, or angled slow point Not Available Not Available X N/A $$$ Install speed hump Not Available Not Available X N/A $$ $$$ Requires design and construction of extensive infrastructure improvements $$ Requires procurement and/or minor construction activities $ Requires limited staff resources and can be implemented in-house with current engineering and/or maintenance staff

Page 80 of 590 ends

City of Brentwood LRSP 59 May 2025

10.1.3. High-Severity Crash Locations
The City identified high-severity crash locations as a result of the network screening analysis. Table 6 presents the locations and contains notes for why these locations were prioritized.

Table 6 – High-Severity Crash Locations
Priority Location Crashes EPDO Notes
Sand Creek Rd and Brentwood
Blvd 14 469
3 Severe Injury crashes, 3
Pedestrian crashes, 1 Bike crash, 9
Dark
Balfour Rd and Cortona
Way/Eagle Rock Way 10 431
3 Severe Injury crashes, 6
Broadsides, 7 Aggressive driving
crashes
Lone Tree Way and O'Hara Ave 10 431 3 Severe Injury crashes (2 involved bicycles)
Brentwood Blvd and Sims Rd 5 363 2 Severe Injury crashes. Most crashes related to Improper turning
Brentwood Blvd from Sims Rd to
Lone Tree Way 4 352 2 Severe Injury crashes (study with intersection above) Balfour Rd from City limits to
American Ave 3 342 1 Fatality, 1 Severe Injury crash, adjacent to Heritage High School 1 Existing signal modification project.

Six project case study locations were selected for further analysis and recommendations. For each of these locations, recommended countermeasures were developed to provide a case study to organize projects when applying for funding. These locations were identified through the analysis process based on their crash histories, the observed crash patterns, and their differing characteristics to provide the most insight into potential systemic safety countermeasures that the City can employ to achieve the most cost-effective safety benefits. The countermeasures are listed in Table 7.

An additional set of low-cost countermeasures is also recommended for systemic implementation across the City. These improvements include installing retroreflective signage and traffic signal backplates, as well as a recommendation to follow the requirements of Assembly Bill (AB) 413 to restrict parking within 20 feet of crosswalks on the vehicle approach side with the goal of improving visibility for all road users (also known as daylighting)8 . AB 413 was signed into law on October 10,
2023, with ticketed enforcement being permitted following January 1, 2025. While daylighting may be conducted with low-cost treatments such as signage, painted curbs, or raised delineators, it is recommended that the City also conduct outreach to inform the public about this new law and its impact in removing parking spaces.
8 AB-413 Vehicles: stopping, standing, and parking. October 10, 2023. Available at https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=202320240AB413

Page 81 of 590 ends

City of Brentwood LRSP 60 May 2025
Table 7 - Countermeasures for Selected Case Study Locations Countermeasure
Crash
Reduction
Factor
(CRF)
Cost
Sand Creek Rd and Brentwood Blvd
Upgrade to high-visibility crosswalks 25% $$
Upgrade signal heads to incorporate
retroreflective backplates 15% $
Upgrade pedestrian push buttons 25% $
Refresh limit lines 10% $
Implement Leading Pedestrian Interval (LPI) 60% $
Balfour Rd and Cortona Way/Eagle Rock Way
Upgrade to high-visibility crosswalks 25% $$
Upgrade signal heads to incorporate
retroreflective backplates 15% $
Install advanced warning beacons on
approaches 30% $$
Upgrade pedestrian push buttons 25% $
Implement Leading Pedestrian Interval (LPI) 60% $
Increased enforcement of speeding and
aggressive driving 5% $
Lone Tree Way and O'Hara Ave
Install colored bicycle lanes through
intersection 39% $
Upgrade signal heads to incorporate
retroreflective backplates 15% $
Install high-visibility crosswalks on all four
approaches 25% $$
Reduce number of receiving lanes on west
side (road diet) 35% $$$
Upgrade pedestrian push buttons 25% $
Implement Leading Pedestrian Interval (LPI) 60% $
Brentwood Blvd and Sims Rd
Install left turn lane along Brentwood Blvd 35% $$$
Refresh limit line 25% $
Upgrade lighting near intersection 40% $$
Refresh center lines and edge lines 25% $

Page 82 of 590 ends

City of Brentwood LRSP 61 May 2025
Countermeasure
Crash
Reduction
Factor
(CRF)
Cost
Brentwood Blvd from Sims Rd to Lone Tree Way
Install speed feedback signage along
Brentwood Blvd 30% $$
Install center left turn lane 30% $$$
Refresh limit lines and center lines 25% $
Improve lighting along segment 35% $$
Balfour Rd from City limits to American Ave
Increased enforcement during school arrival
and dismissal 5% $
Road diet (reduce to one lane in each
direction) 35% $$$
Install retroreflective backplates 15% $
Implement leading pedestrian interval 60% $
Install speed feedback signage 30% $$
Install colored bike lanes 35% $
Consider reducing the number of receiving
lanes on west side (Road Diet) 35% $$
Citywide Systemic Improvements
Install retroreflective backplates on signal
heads 15% $
Implement intersection daylighting per AB 413 11% $
Install retro-reflective signage and strips at
unsignalized intersections 15% $

10.2. Non-Infrastructure Countermeasures
The National Highway Traffic Safety Administration (NHTSA) Countermeasures that Work, Ninth Edition, is a reference to assist safety stakeholders in selecting effective, science-based noninfrastructure traffic safety countermeasures for major highway safety problem areas. While many of the countermeasures are more appropriate to apply at the state-level or require legislative modifications to implement, Table 8 contains countermeasures that have demonstrated effectiveness and could be applied at the City level. Note that while there are several other noninfrastructure countermeasures available, only those which have an effectiveness rating of four stars or higher are presented. Access to Drug Recognition Experts (DREs) and Advanced Roadside Impaired Driving Enforcement (ARIDE) training for law enforcement is not included in the document but are countermeasures that could also be considered for the City.

Page 83 of 590 ends

City of Brentwood LRSP 62 May 2025
Table 8 — Brentwood Non-Infrastructure Countermeasures Toolbox Countermeasure Effectiveness Cost to
Implement Use Time to Implement
Aggressive Driving
Automated enforcement systems (red
light camera systems)
*****
Effective $$$† Medium Medium
Impaired Driving
Publicized Sobriety Checkpoints *****
Effective $$$ Medium Short
High-Visibility Saturation Patrols
(large number of law enforcement
officers patrolling a specific area)
****
Situational $$ High Short
Occupant Protection (Seat Belts, Helmets, Child Seats)
Short-term high visibility enforcement *****
Effective $$$ Medium Medium
Integrated nighttime seat belt
enforcement
(night time seat belt enforcement in
conjunction with High-Visibility
Saturation Patrols for impaired
driving)
****
Situational $$$ Unknown Medium
Distracted Driving
High visibility cellphone/text
messaging enforcement
****
Situational $$$ Low Medium
Effectiveness:
***** Demonstrated to be effective by several high quality evaluations with consistent results **** Demonstrated to be effective in certain situations Cost to Implement:
$$$ Requires extensive new facilities, staff, equipment, or publicity, or makes heavy demands on current resources $$ Requires some additional staff time, equipment, facilities, and/or publicity $ Can be implemented with current staff, perhaps with training; limited costs for equipment, facilities, and publicity †
Can be covered by income from citations
Use:

High: More than two-thirds of states, or a substantial majority of communities Medium: Between one-third and two-thirds of states or communities Low: Less than one-third of states or communities
Unknown: Data not available
Time to Implement:

Long: More than 1 year
Medium: More than 3 months but less than 1 year
Short: 3 months or less

Page 84 of 590 ends

City of Brentwood LRSP 63 May 2025

11. EVALUATION AND IMPLEMENTATION

11.1. Evaluation
The success of the LRSP can be evaluated using the general process outlined below. This process can be useful to monitor progress towards implementation of safety improvement projects and strategies, and to determine when updates to the LRSP should be considered.  Law enforcement continues monitoring and recording of traffic incidents on local roadways.  Conduct frequent progress meetings (annually or quarterly) betweenCity staff and a working group (i.e. traffic safety committee) to review the latest crash data, including assessing the effectiveness of safety countermeasures implemented, discussing ongoing traffic safety challenges, and tracking progress on plan implementation.  Maintain a list of focus/priority areas where there are transportation safety concerns based on review of crash data. The list of priority and/or top crash locations can be updated as an outcome of review of updated crash data and trends.
 Perform an update to the plan after no more than five years. It is recommended that updates to the LRSP be approved by City Council and made available to the public in accordance with Caltrans’ Local Roadway Safety Plan guidance.

11.2. Implementation
Implementation of the LRSP can be accomplished through development and implementation of safety improvement projects and strategies, the establishment of new/updated policies and programs, and development/strengthening of relationships with stakeholders.

With regard to projects, the following section identifies potential focus areas for the City in the nearto-mid-term.

11.2.1. Near- and Mid-Term Focus Areas
The opportunities identified in this LRSP provide more of the systemic countermeasures that can be applied within the City. Over the next three to five years, it is recommended that the City concentrate its efforts on the following emphasis areas:

1. Aggressive Driving

2. Speeding

3. Vulnerable Road Users (Pedestrians & Bicyclists)

4. Intersections with Unconventional Geometries
Analysis conducted at the citywide level indicated that these factors were some of the most frequent influences contributing to crashes within the City. The countermeasure opportunities previously discussed in this report for both systemic and project-specific improvements can be used as a basis for developing projects at locations where addressing these focus areas would be of the most benefit. Projects that address these focused areas can be developed with a high benefit-to-cost ratio (by applying City-wide crash rates), allowing competitive projects to be developed even at sites with little to no direct crash history, but with conditions that might contribute to future crashes.

Page 85 of 590 ends

City of Brentwood LRSP 64 May 2025

11.3. Funding
Competitive funding resources are available to assist in the development and implementation of safety projects in Brentwood. The City should continue to seek available funding and grant opportunities from local, state, and federal resources to accelerate their ability to implement safety improvements throughout Brentwood. The following is a high-level introduction into some of the main funding programs and grants for which the City can apply.

11.3.1. Highway Safety Improvement Program (HSIP)
The HSIP is a Federal program housed under Fixing America’s Surface Transportation (FAST) Act. This program apportions funding as a lump sum for each state, which is then divided among apportioned programs. These flexible funds can be used for projects to preserve or improve safety conditions and performance on any Federal-aid highway, bridge projects on any public road, facilities for nonmotorized transportation, and other project types. Safety improvement projects eligible for this funding include:
 New or upgraded traffic signals
 Upgraded guard rails
 Pedestrian warning flashing beacons
 Marked crosswalks
California’s local HSIP focuses on infrastructure projects with national recognized crash reduction factors. Normally HSIP call-for-projects is made at an interval of one to two years. The applicant must be a city, a county, or a tribal government federally recognized within the State of California.

Additional information regarding this program at the Federal level can be found online at:
https://safety.fhwa.dot.gov/hsip/. California specific HSIP information – including dates for upcoming call for projects - can be found at: http://www.dot.ca.gov/hq/LocalPrograms/hsip.html.

11.3.2. Safe Streets and Roads for All (SS4A)
The SS4A Grant Program is a federal program established by the Bipartisan Infrastructure Law. A total of $5 billion are available from 2022-2026 in the form of planning grants and implementation grants. Grant applications for projects that implement the Safe Systems Approach, such as those related to speed management, improvements in underserved communities, and vulnerable road users, are encouraged. Implementation grant projects must be identified in an applicant’s qualifying Safety Action Plan. The SS4A Self-Certification Eligibility Worksheet describes the required elements of an Action Plan and can be accessed at: https://www.transportation.gov/sites/dot.gov/files/2024- 02/SS4A-FY24-Self-Certification-Worksheet.pdf
Additional information about implementation grants can be found at:
https://www.transportation.gov/grants/ss4a/implementation-grants

11.3.3. Caltrans Active Transportation Program (ATP)
Caltrans Active Transportation Program (ATP) is a statewide funding program, created in 2013, consolidating several federal and state programs. The ATP funds projects that encourage increased mode share for walking and bicycling, improve mobility and safety for non-motorized users, enhance public health, and decrease greenhouse gas emissions. Projects eligible for this funding include:
 Bicycle and pedestrian infrastructure projects

Page 86 of 590 ends

City of Brentwood LRSP 65 May 2025
 Bicycle and pedestrian planning projects (e.g. safe routes to school)  Non-infrastructure programs (education and enforcement) This program funding is provided annually. The ATP call for projects typically comes out in the spring.

Information on this program and cycles can be found online at:
http://www.dot.ca.gov/hq/LocalPrograms/atp/

11.3.4. State Transportation Improvement Program (STIP) The State Transportation Improvement Program (STIP) provides state and federal gas tax money for improvements both on and off the state highway system. STIP programming occurs every two years.

The programming cycle begins with the release of a proposed fund estimate, followed by California Transportation Commission (CTC) adoption of the fund estimate. The fund estimate serves to identify the amount of new funds available for the programming of transportation projects. Once the fund estimate is adopted, Caltrans and the regional planning agencies prepare transportation improvement plans for submittal. Caltrans prepares the Interregional Transportation Improvement Program (ITIP) using Interregional Improvement Program (IIP) funds, and regional agencies prepare Regional Transportation Improvement Programs (RTIPs) using Regional Improvement Program (RIP) funds. The STIP is then adopted by the CTC.

11.3.5. California SB 1
SB 1 is a landmark transportation investment to rebuild California by fixing neighborhood streets, freeways, and bridges in communities across California and targeting funds toward transit and congested trade and commute corridor improvements.

California’s state-maintained transportation infrastructure will receive roughly half of SB 1 revenue:
$26 billion. The other half will go to local roads, transit agencies, and an expansion of the state’s growing network of pedestrian and cycle routes. Each year, this new funding will be used to tackle deferred maintenance needs both on the state highway system and the local road system, including:
 Bike and Pedestrian Projects: $100 million
o This will go to cities, counties and regional transportation agencies to build or convert more bike paths, crosswalks and sidewalks. It is a significant increase in funding for these projects through the ATP.
 Local Planning Grants: $25 million

11.3.6. California OTS Grants
This program has funding for projects related to traffic safety, including transportation safety education and encouragement activities. Grants applications must be supported by local crash data (such as the data analyzed in this LRSP) and must relate to the following priority program areas:
 Alcohol Impaired Driving
 Distracted Driving
 Drug-Impaired Emergency Medical Services
 Motorcycle Safety
 Occupant Protection
 Pedestrian and Bicycle Safety
 Police Traffic Services
 Public Relations, Advertising, and Marketing Program

Page 87 of 590 ends

City of Brentwood LRSP 66 May 2025
 Roadway Safety and Traffic Records

11.3.7. ABAG Regional Funding Programs
ABAG provides funding allocation for various multi-modal transportation projects in the Bay Area.

Projects that are considered for this regional funding program must be eligible for Congestion Mitigation and Air Quality (CMAQ), Rural Surface Transportation Program (RSTP), or STIP funds.

Performance outcomes which are considered for selection include those which:
 Reduce regional VMT per capita
 Reduce regional congest VMT per capita
 Increase multi-modal or alternative travel choices
 Provide long term benefits, sustaining both rural and urban economies  Improve movement of goods, in and through the region
 Improve safety and security
Maintain and improve upon the existing transportation system

Page 88 of 590 ends

City of Brentwood LRSP 67 May 2025

12. NEXT STEPS
The City has completed this LRSP to guide the process of future transportation safety improvements for years to come. In addition to the actions identified in the Implementation Plan, the City can perform the following to guide the success of this LRSP and its overall safety efforts. • Develop investment program to help achieve the City’s crash reduction goals. • Work with state and partner agencies on implementation of large-scale programs and policies.
• Incorporate safety analysis findings in future updates of safety programs. • Monitor statewide safety priorities, guidance, and funding opportunities.

Page 89 of 590 ends

City of Brentwood LRSP 68 May 2025

APPENDIX A

INTERSECTION NETWORK SCREENING RESULTS

Page 90 of 590 ends

Intersection
Injury Crashes
EPDO*
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Impaired
Dark
Wet
Case Study Location
Sand Creek Rd and Brentwood Blvd 14 469 0 3 9 2 1 4 3 0 1 0 1 3 1 4 0 9 1 X Lone Tree Way and Shady Willow Ln 12 92 0 0 4 8 5 0 2 1 0 0 0 3 1 6 0 2 1 Balfour Rd and Fairview Ave 12 124 0 0 11 1 5 1 3 1 0 0 0 1 1 5 1 4 1 Sand Creek Rd and Fairview Ave 12 110 0 0 8 4 0 0 6 2 2 0 0 2 0 6 0 4 0 Sand Creek Rd and O'Hara Ave 12 110 0 0 8 4 1 0 8 2 0 0 0 0 1 8 1 3 2 Balfour Rd and Cortona Way/Eagle Rock Way 10 431 0 3 6 1 6 1 3 0 0 0 0 0 0 7 0 3 2 X Lone Tree Way and O'Hara Ave 10 431 0 3 6 1 3 0 2 1 1 0 0 0 3 5 1 4 0 X Sand Creek Rd and Sand Creek Xing 9 83 0 0 6 3 3 0 3 0 1 0 0 2 0 5 0 3 0 Sand Creek Rd and Shady Willow Ln 8 186 0 1 5 2 1 1 6 0 0 0 0 0 0 7 0 2 1 Central Blvd and Fairview Ave 8 72 0 0 5 3 2 1 2 0 1 0 0 1 1 4 0 0 0 Lone Tree Way and Canada Valley Rd 7 166 0 1 2 4 2 1 3 0 1 0 0 0 0 6 0 4 0 Central Blvd and Minnesota Ave 7 66 0 0 5 2 5 0 1 0 0 0 0 0 1 5 0 0 0 Balfour Rd and Claremont Dr 7 70 0 0 6 1 1 0 5 0 0 0 0 0 1 7 0 0 1 Sand Creek Rd and Minnesota Ave 7 285 0 2 3 2 0 1 4 0 0 0 0 0 2 6 0 1 0 Brentwood Blvd and 2nd Ave 7 70 0 0 6 1 2 2 1 1 1 0 0 0 0 4 0 3 1 Walnut Blvd and Balfour Rd 7 171 0 1 3 3 4 1 1 1 0 0 0 0 0 5 0 0 1 Brentwood Blvd and Balfour Rd 7 66 0 0 5 2 0 0 4 1 0 1 0 0 1 5 1 2 0 Lone Tree Way and Jeffery Way 6 151 0 1 0 5 3 0 2 0 1 0 0 0 0 3 1 2 0 Balfour Rd and Griffith Ln 6 64 0 0 6 0 2 1 1 1 1 0 0 0 0 5 1 1 0 Central Blvd and Brentwood Blvd 6 169 0 1 4 1 3 0 1 0 0 0 0 0 2 4 0 1 0 Lone Tree Way and Heidorn Ranch Rd 5 31 0 0 0 5 0 2 3 0 0 0 0 0 0 3 0 0 0 Lone Tree Way and Empire Ave 5 145 0 1 0 4 1 2 1 0 0 0 0 1 0 2 0 2 0 Lone Tree Way and Anderson Ln/Adams Ln 5 49 0 0 4 1 1 0 2 2 0 0 0 0 0 4 0 1 0 Brentwood Blvd and Grant St/Sunset Rd 5 158 1 0 3 1 1 0 4 0 0 0 0 0 0 4 0 0 0 Balfour Rd and John Muir Pkwy 4 34 0 0 2 2 2 0 1 1 0 0 0 0 0 2 0 2 0 City of Brentwood Crash Summary
Signalized Intersections

Page 91 of 590 ends

Intersection
Injury Crashes
EPDO*
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Impaired
Dark
Wet
Case Study Location
City of Brentwood Crash Summary
Empire Ave and Shady Willow Ln Signalized Intersections 4 143 0 1 1 2 1 0 0 1 2 0 0 0 0 2 0 0 1 Lone Tree Way and Fairview Ave 4 38 0 0 3 1 0 0 3 0 0 0 1 0 0 4 0 1 0 Central Blvd and Griffith Ln 4 43 0 0 4 0 1 0 0 0 3 0 0 0 0 2 0 2 0 Lone Tree Way and Brentwood Blvd 4 143 0 1 1 2 1 0 3 0 0 0 0 0 0 2 2 1 0 Balfour Rd and Hudson Dr 4 34 0 0 2 2 1 0 3 0 0 0 0 0 0 4 0 0 0 Balfour Rd and American Ave 3 28 0 0 2 1 0 0 1 0 0 0 1 1 0 1 0 0 1 Grant St and Empire Ave 3 32 0 0 3 0 1 0 0 1 0 0 0 0 1 2 1 0 0 Grant St and Fairview Ave 3 142 1 0 2 0 1 0 0 0 1 0 0 0 1 1 1 0 0 Central Blvd and 2nd St 3 32 0 0 3 0 2 0 0 1 0 0 0 0 0 2 0 1 0 Brentwood Blvd and Oak St 3 28 0 0 2 1 0 1 1 0 1 0 0 0 0 1 0 2 1 Pine St and 2nd St 3 32 0 0 3 0 1 0 0 0 0 0 0 0 2 1 0 1 0 Balfour Rd and McViking Way 3 28 0 0 2 1 1 0 2 0 0 0 0 0 0 3 0 0 0 Unsignalized Intersections
Balfour Rd and Sellers Ave 11 109 0 0 9 2 8 2 1 0 0 0 0 0 0 9 0 3 0 Balfour Rd and Garin Pkwy 7 221 0 1 4 2 6 0 0 0 0 0 0 0 1 3 0 2 0 Balfour Rd and Armstrong Way 6 55 0 0 4 2 4 0 0 0 1 0 0 1 0 0 1 1 1 Balfour Rd and Rosegate Ave 5 54 0 0 5 0 3 1 1 0 0 0 0 0 0 0 1 1 0 Brentwood Blvd and E Sims Rd 5 363 0 2 3 0 0 1 2 1 1 0 0 0 0 2 0 2 1 X Balfour Rd and Guise Way 5 208 0 1 4 0 2 0 1 1 1 0 0 0 0 2 0 1 0 Lone Tree Way and Double K Rd 4 198 0 1 3 0 0 0 2 1 0 0 0 0 1 2 0 0 0 O'Hara Ave and Grant St 4 38 0 0 3 1 0 0 1 1 1 0 0 0 1 3 0 1 0 Brentwood Blvd and Sunrise Rd 4 43 0 0 4 0 0 1 0 1 1 0 0 1 0 0 0 1 0 Balfour Rd and Heritage High School Driveway 3 342 1 1 1 0 0 0 2 0 1 0 0 0 0 1 0 1 0 X Lone Tree Way and Windy Spring Ln 3 28 0 0 2 1 0 0 2 0 1 0 0 0 0 2 0 0 0 Neroly Rd and Lavender Way 3 23 0 0 1 2 1 0 1 0 0 0 0 0 1 2 0 0 0

Page 92 of 590 ends

Intersection
Injury Crashes
EPDO*
Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
Broadside
Sideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Impaired
Dark
Wet
Case Study Location
City of Brentwood Crash Summary
Central Pkwy and Peachwillow Dr Signalized Intersections 3 32 0 0 3 0 1 1 0 0 0 0 0 1 0 0 0 1 0 Dainty Ave and Walnut Blvd 3 23 0 0 1 2 1 1 0 1 0 0 0 0 0 0 0 0 0 Brentwood Blvd and Spruce St 3 178 0 1 0 2 1 0 0 1 0 0 0 0 1 2 0 1 0 Remington St and Walnut Blvd 3 187 0 1 2 0 1 1 0 0 0 0 0 1 0 0 1 2 0 Brentwood Blvd and Havenwood Ave 3 28 0 0 2 1 1 1 1 0 0 0 0 0 0 1 0 1 1 Walnut Blvd and McClaren Rd 3 32 0 0 3 0 1 1 0 0 0 1 0 0 0 1 1 1 0 Spruce St and Garin Pkwy 3 28 0 0 2 1 1 0 0 0 0 0 1 0 1 0 1 1 1 *Equivalent Property Damage Only Crashes

Page 93 of 590 ends

City of Brentwood LRSP 69 May 2025

APPENDIX B

SEGMENT NETWORK SCREENING RESULTS

Page 94 of 590 ends

Facility Limits
Injury Crashes
EPDO
2 Fatal
Serious Injury
Other Visible Injury
Complaint of Pain
BroadsideSideswipe
Rear End
Head On
Hit Object
Overturned
Other
Pedestrian
Bicycle
Aggressive
Impaired
Dark
Wet
Priority Location
O'Hara Ave Sand Creek Rd to Town Center Terrace 5 204 0 1 3 1 0 0 2 0 3 0 0 0 0 0 0 3 1 Sand Creek Rd Shady Willow Ln to CA-4 Ramps 3 28 0 0 2 1 0 1 2 0 0 0 0 0 0 0 0 1 0 Brentwood Blvd Lone Tree Way to E Sims Rd 4 352 0 2 2 0 1 0 1 1 1 0 0 0 0 0 0 1 0 X Brentwood Blvd Pine St to Diablo Way 4 43 0 0 4 0 1 0 0 1 1 0 0 1 0 0 0 2 0 Brentwood Blvd E Sims Rd to Neroly Rd/Delta Rd 4 43 0 0 4 0 0 1 2 0 0 0 0 0 1 0 0 0 0 Minor Arterial
Major Arterial
City of Brentwood Crash Summary

2. Equivalent Property Damage Only Crashes

1. Local Critical Crash Rate Differential

Page 95 of 590 ends

City of Brentwood LRSP 70 May 2025

APPENDIX C

PUBLIC COMMENTS

Page 96 of 590 ends

City of Brentwood LRSP May 2025
No. Location Comment Up Votes
1 Adams Ln and Grant St
Cars always block bike lane or ignore crosswalk pedestrians. I’ve witnessed three close calls to kids on bike or walking getting hit by vehicle when they attempt to make a right turn on grant from adams.
0 2 Amber Ln and Salice Way We need to have a safety crosswalk between Salice Way and Amber Lane to allow kids to cross and attend Pioneer Elementary School safely. 0
3 American Ave and Heritage
High School North Driveway
This should be at the top of the list to fix. 0
4 American Ave and Heritage
High School South Driveway
There is only one way in and out of the access road to Adam’s MS and Heritage HS. During drop off and pick up times traffic is really bad. Creating an alternate entrance/exit would be extreme beneficial.
1 5 Anderson Ln North of
Kenwood Dr
After you leave the Brentwood Park there are no side walks or bike lanes as you approach Lone Tree. It very dangerous to walk or ride your bike on Anderson to Brownstone as well. 0 6 Armstrong Way S of Nunn St
People treat armstrong way like their personal drag race strip at all times of day. The noise is a nuisance and obviously safety is a concern as well. Some sort of traffic calming is in order!
0 7 Ascot Pl West of Dover Ct Many car speed thru Brentwood park around each exit/entrance 0 8 Balfour Rd and Brentwood
Blvd
Only one crossing guard and its a 4 way intersection, the guard stays on one corner by Jamba Juice only. I always see cars running lights and on top of that some kids crossing on foot or on bikes don't look and I've seen some close calls. 0 9 Balfour Rd and Tradition Way History of pedestrians hit by cars here. Needs a stop sign 1 10 Brentwood Blvd and Birch St
Children of all ages cross the street here and there is no crosswalk. The city is well aware that kids cross here with no safety measures in place and has done nothing about it. They are going to continue to cross here because it is simply the only route 2 11 Brentwood Blvd and Birch St Seriously need an over the road pedestrian bridge. 0 12 Brentwood Elementary
School
The cross walk to go to Brentwood Elementary school is extremely dangerous during drop off every single morning. Need a cross guard and cops. Everyone always running stop signs and in a rush. Only a matter of time when someone is severely injured. 3 13 Brentwood Elementary
School
I agree, and the people who park at the church and cross there instead of walking to the crosswalk is a problem. I know the principal goes out there to direct traffic, but it is a nightmare for those of us who live in the area and have to drop kids off. 0 14 Brentwood Elementary
School
The area is a big problem. I walked with my kids to school and drive them to school also.

The problems are drivers parking at the side of the street, parking at bike lanes and at the bus stop and leaving their vehicles unattended. Drivers not stopping, r 2

Page 97 of 590 ends

City of Brentwood LRSP May 2025
No. Location Comment Up Votes
15 Chestnut St and 3rd St This is a very busy intersection during school hours. My daughter was hit on her bicycle in the crosswalk. 0
16 Foothill Dr and E Country
Club Dr
In Brentwood red lights still mean you can go, this is a huge problem out here. Will not allow my kids to cross the street to walk to school, which doesn’t help with the traffic to the schools that only have one way in and one way out.
0 17 Larkspur Ln
Speeding on Larkspur Lane is out of control. Nearly every car that drives down this street is at least 10 miles over the speed limit, some people drive down this street at 60mph. The city sent out a survey for speed bumps and ‘did not receive enough re 0 18 Lone Tree Way and Trail Xing
West id Anderson Ln
This path is used by neighborhood families to get to Marsh Creek School but there isn’t a safe convenient way to cross Lone Tree Way. This problem will only worsen when the new elementary school construction is complete. We need a safe route for Rose 1 19 Lone Tree Way and Trail Xing
West id Anderson Ln
Trail is on both sides of Lone Tree, but wit a stop light only down the way without good path access to the light and too little protection for bikes and pedestrians from such a busy road. 2 20 McClarren Rd and Griffith Ln 4 way crossing for students walking/biking to school unsafe from all corners 2 21 McClarren Rd and Griffith Ln
4 way crosswalk, only 2 ways protected by a crossing guard during school hours. Heavy traffic at all 4 corners. I have personally almost been hit while walking with my children on the unprotected side of the crosswalk and have witnessed children, walking 2 22 McClarren Rd and Griffith Ln
I see cars driving through crosswalks while children have not cleared the crosswalk completely, daily. Have almost been hit several times. Crossing guard only crosses two of the 4 crosswalks. The crosswalk linking the new development, Villagio, is unmanned 1 23 McClarren Rd and Griffith Ln
I feel like this intersection should have a light that once a cycle all cars stop and it lets all 4 crosswalks go at the same time. This would seriously cut down on who gets to go when. It so frustrating as a pedestrian but even more so as a driver. 3 24 Mendota St and Garin Pkwy Traffic and walking safety mostly during school release hours 0 25 Minnesota Ave and Sand
Creek Trail
The crossing during school hours needs better signs and lights to make the driver aware of the crossing 1
26 Minnesota Ave and Trail
Hi This road could use a cross walk or a speed bump as it a spot to cross to get to the trail on the other side. We use it often as does many people I see. Its a blind corner as well with the curve....
0 27 Minnesota Ave by Bristow
Middle School
Too many cars park along the school side of the street. Suv, trucks, and cars are in the red zone/yellow zone area preventing visibility for children in crosswalks and along the school sidewalks. Automobiles are trying pull out of the school driveways ha 0

Page 98 of 590 ends

City of Brentwood LRSP May 2025
No. Location Comment Up Votes
28 Oak St and Garin Pkwy Busy intersection with teens crossing without looking. Challenging for vehicles to get through intersection. 0
29 Oak St and Garin Pkwy
Worry about pedestrians first. It’s the drivers responsibility to be on alert for pedestrians.

People speed up and down Larkspur at speeds up to 60 mph. The city is well aware of this problem and has done nothing.
0 30 Oak St East of 4th St Speed bump only 0
31 O'Hara Ave and O'Hara Ln No crosswalk or sidewalk going towards lone tree way. 0 32 Rose Brook Terrace and Ron
Nunn Elementary School
driveway
At this location there is a walking gate to the private gated community, Apple Hill. Parents and students use this gate to enter/exit during drop off and pick up. During pick up after school, parents and students walk straight from this gate across the s 0 33 San Jose Ave and Wildcat Ln Speed bumps or other ways to reduce speed at this intersection. Too many speeders driving way above posted speed limit endangering pedestrians and bikers. 1 34 San Jose Ave between Mill
Creek Way and Wildcat Ln
Need speed bumps or other safety measures on San Jose Ave between Fairview and Hwy 4 underpass. Too many speeders rushing through this street, disregarding crosswalks and children walking to school.
1 35 Shady Willow Ln and Grant St
My daughter and I walk to and from school and we have almost been hit several times while crossing the street (we cross over Shady Willow on Grant). There is no crossing guard before or after school. Cars will turn right from the left hand turn lane due 0 36 Walnut Blvd
Homeless Encampment
History of crime and unlawful drug use near this encampment. Safety hazard for pedestrians walking near by.
1 37 Walnut Rd and Indiana Ave
The real problem is that there is no provided bus service. Every parent in Brentwood is driving their kids to school at the same time. It is a NIGHTMARE. It would be much simpler to have a few neighborhood meetup areas for school bus pick up. I would 0

Page 99 of 590 ends

City of Brentwood LRSP May 2025

APPENDIX D

SUMMARY OF PROGRAMS, POLICIES, AND PRACTICES FOR THE

CITY OF BRENTWOOD

Page 100 of 590 ends

City of Brentwood LRSP Appendix C (i) May 2025
Topic Current Status Implement or Enhance
Complete Streets Policy
The City of Brentwood
adopted a Resolution
adopting a Complete Streets
Policy9
. The City of Brentwood
General Plan Circulation
Chapter includes Action CIR
1d encouraging complete
streets to support City
circulation goals10.

It is recommended that the City of
Brentwood continue implementing
Action CIR 1d to promote the
City’s Complete Streets Policy.

Traffic Impact Fees
The City levies traffic impact
fees outlined in the City’s
Cost Allocation Plan11.

Consider dedicating a percentage
of fees for traffic safety
improvements.

Safe Routes to School
Funding
The City does not have a SRTS
program. Contra Costa
Transportation Authority
(CCTA) has a Safe Routes to
School (SR2S) program12.

Seek grant funding opportunities
to create a SRTS plan for the
elementary/middle/high schools
in Brentwood.

Traffic Safety Education The City has a traffic safety
webpage with resources13.

Work with education and PD to
develop traffic safety education
programs in public areas and
schools, including bicycle/
pedestrian components. It is also
recommended that the City
provide opportunities for residents
to request traffic infrastructure
improvements with the Public
Works Department.
9 City of Brentwood, A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BRENTWOOD ADOPTING A “COMPLETE STREETS POLICY” FOR THE CITY OF BRENTWOOD (“CITY”), Available at https://pubbrentwood.escribemeetings.com/FileStream.ashx?DocumentId=4282. 10 City of Brentwood, 2014, City of Brentwood General Plan, Available at https://www.brentwoodca.gov/home/showpublisheddocument/3428/637806072129300000 11 City of Brentwood, 2025, Cost Allocation Plans, Available at https://www.brentwoodca.gov/government/finance-information-systems/financialdocuments/cost-allocation-plans. 12 Contra Costa Transportation Authority, 2025, Safe Routes to School (SR2S), Available at https://ccta.net/projects/safe-routes-to-school-sr2s/ 13 City of Brentwood, 2025, Traffic Safety Unit (TSU), Available at https://www.brentwoodca.gov/government/police/traffic-safety-unit-tsu.

Page 101 of 590 ends

City of Brentwood LRSP Appendix C (ii) May 2025
Topic Current Status Implement or Enhance
Program for Reviewing
Crash Activity
The City is responsive to
safety incidents and
coordinates with PD.

Set up formal program for
reviewing crash activity at a fixed
time interval; Update database for
future LRSP analyses & updates.

Crossroads Database
Updates
City of Brentwood PD
maintains an incident log.

Consider integrating the existing
PD crash database with the
crossroads system (or similar) to
ensure accurate geocoding of
crashes and recoding of crash
party and victim information.

City Enforcement on
Bicycle Rules
The City of Brentwood
Municipal Code Chapter

10.12 outlines areas in which
bicycling is prohibited14. The
City of Brentwood PD is also
actively engaging with the
public about bicycle safety15.

City transportation division should
engage with PD in enforcement
and education at strategic
locations based on collision
patterns, community events, and
safety priorities.

Sobriety / Seatbelt
Checks
The City conducts sobriety
checkpoints16.

City Traffic and Transportation
division should engage with PD in
planning and implementing
sobriety and & seatbelt checks
based on collision patterns,
community events, and safety
priorities.

Coordination between
City Law Enforcement
and Adjacent
Jurisdictions
The City has coordinated with
adjacent jurisdictions
regarding investigations of
elder and dependent adult
abuse. No concurrent
jurisdiction responsibility and
agreements are listed in the
Brentwood Police
Department Policy Manual17.

Consider coordination with
adjacent jurisdictions regarding
OTS grants for seatbelt/ DUI
checkpoints or other safety
initiatives.
14 City of Brentwood, 2024, Chapter 10.12: Bicycles, Skateboards, Roller Skates, Motorcycles and Toy Vehicles, Available at https://ecode360.com/43614653.
15 City of Brentwood, 2024, Brentwood PD Bike Rodeo, Available at https://www.brentwoodca.gov/government/police/community-youth-outreach/brentwood-pd-bikerodeo#ad-image-0. 16 City of Brentwood Police Department, 2024, Brentwood Police Department DUI/Driver’s License Checkpoint Planned Social Media Post, Available at:
https://www.instagram.com/p/DDX58gyS02I/?utm_source=ig_web_copy_link. 17 Brentwood Police Department, 2025, Brentwood Police Department Policy Manual, Available at https://www.brentwoodca.gov/home/showpublisheddocument/10472/638771994281330000

Page 102 of 590 ends

City of Brentwood LRSP Appendix C (iii) May 2025
Topic Current Status Implement or Enhance
Speed Surveys The City conducts speed
surveys18 19
Continue to implement regular
surveying as required by California
Vehicle Code; Review new
guidance from Assembly Bill 43.

Speed Limits
Speed Limits are set using
regularly conducted speed
surveys10 11
Continue to update as required by
California Vehicle Code; Exercise
context-based flexibility offered
under Assembly Bill 43.

Traffic Calming Policies
The City General Plan
includes Policy CIR 3-8
outlining traffic management
and calming techniques to
control speeds on residential
streets and collector streets
with residential
developments. The City does
have a Traffic Calming
Program to implement traffic
calming devices if initial
enforcement and engineering
do not resolve speeding
issues20.

Continue implementation of the
traffic calming program to reduce
aggressive driving on local roads.

Transit Vehicles
Accommodation of
Bicycles
Bikes are permitted on Tri
Delta Transit21
Continue to accommodate
bicycles on transit to promote
multi-modal trips.

Coordination of Transit
Providers and City Staff Yes.

Continue coordination; Work to
identify areas for improvements
particularly with first and last mile
connections.
18 City of Brentwood, 2025, Determining Speed Limits, Available at:
https://www.brentwoodca.gov/government/engineering/traffic-transportation/determining-speed-limits. 19 City of Brentwood, 2023, Speed Surveys by Street, Available at https://www.brentwoodca.gov/home/showpublisheddocument/3290/638239722663470000. 20 City of Brentwood, 2025, Traffic Calming, Available at https://www.brentwoodca.gov/government/engineering/traffic-transportation/traffic-calming. 21 Tri Delta Transit, 2024, Bikes on Buses, Available at https://www.trideltatransit.com/fares-guides/appstools-to-ride/bikes-on-buses/.

Page 103 of 590 ends

City of Brentwood LRSP Appendix C (iv) May 2025
Topic Current Status Implement or Enhance
Bicycle and Pedestrian
Master Plans
The City of Brentwood has a
Parks, Trails and Recreation
Master Plan22 and Parks,
Trails and Recreation Master
Plan Update23.

Develop a Bike and Pedestrian
Master Plan. The plan can include
an assessment of existing
conditions, bike/ped crash data,
and potential projects. Consider
tracking bike and pedestrian
crashes, and implementing
identified projects with high need
and high feasibility.

General Plan Addresses
Multimodal Traffic Safety
The General Plan has multiple
policies pertaining to
multimodal transportation
included in the Circulation
Chapter2
.

Continue to implement
recommendations under General
Plan; Regularly assess progress
and areas for improvement; Avoid
projects that prioritize operational
improvements over multimodal
safety.

Inventory of Bicycle,
Pedestrian, Parking, and
other facilities
The City of Brentwood has a
Master Plan Trail Map which
provides an inventory of Class
I Bike Paths24. The City of
Brentwood also indicates that
they keep an inventory of
Class II Bike Lanes25. The City
Public Works Department
Street Maintenance Division
monitors sidewalk
maintenance26.

Continue to provide an inventory
of bicycle facilities but consider
providing a map classifying all
bicycle facilities (Class I, II, III, and
IV) citywide. Consider publishing
an inventory of pedestrian,
parking, and other facilities.

Consider performing annual
monitoring of bicycle, pedestrian,
parking, and other facilities.
22 City of Brentwood, 2002, Parks, Trails and Recreation Master Plan, Available at:
https://www.brentwoodca.gov/home/showpublisheddocument/8139/638321025674830000 23 City of Brentwood, Parks, Trails & Recreation Master Plan Update, Available at https://www.brentwoodca.gov/home/showpublisheddocument/3768/637812746114400000 24 City of Brentwood, 2018, Master Plan Trail Map: Trail Connectivity and Circulation Network Diagram, Available at https://www.brentwoodca.gov/home/showpublisheddocument/3762/637812055093170000. 25 City of Brentwood, 2025, Trails - Bike Trails/Lanes, Available at https://www.brentwoodca.gov/government/parks-recreation/parks-and-trails/trails. 26 City of Brentwood, 2025, Street Maintenance, Available at https://www.brentwoodca.gov/government/public-works/street-maintenance.

Page 104 of 590 ends

City of Brentwood LRSP Appendix C (v) May 2025
Topic Current Status Implement or Enhance
Traffic Safety Audit
Program
The City has not published
evidence of a formal program,
however, the Traffic and
Transportation Section of the
Engineering Department
oversees responsibility of the
City of Brentwood’s streets,
highways, and transit
systems. The City’s Traffic
Safety Unit (TSU) within the
Police Department
investigates collisions and
participates in traffic
education programs27.

Implement a traffic safety audit
program to regularly review
collision data and respond to
community feedback regarding
traffic safety challenges.

Coordination between
Emergency Response
and City Transportation
Planning
The City Traffic Engineer
serves as the Transportation
Planning staff and is a
member of the Emergency
Management Team as
outlined in the City of
Brentwood Emergency
Operations Plan28 to ensure
proper emergency responses.

Continue engaging emergency
response in transportation
planning processes; Include
membership in project technical
advisory committees where
appropriate.

Coordination between
Local Health Agencies
and City Transportation
Planning
None posted online.

Consider engaging local health
agencies in transportation
planning processes; Include
membership in project technical
advisory committees where
appropriate.

Resident Feedback
Community members can
leave comments using
Brentwood Connect 24/7 to
issue a service request29.

Continue to seek out resident
feedback; Review comments for
trends and patterns that may
suggest opportunities for systemic
safety improvements.
27 City of Brentwood, 2025, Traffic Safety Unit (TSU), Available at https://www.brentwoodca.gov/government/police/traffic-safety-unit-tsu. 28 City of Brentwood, 2013, City of Brentwood Emergency Operations Plan, Available at https://www.brentwoodca.gov/home/showpublisheddocument/8454/638368726787530000. 29 City of Brentwood, 2025, Brentwood Connect 24/7, Available at https://www.brentwoodca.gov/government/public-works/service-request

Page 105 of 590 ends

City of Brentwood LRSP Appendix C (vi) May 2025
Topic Current Status Implement or Enhance
Maintenance of Roadway
Surfaces
The City of Brentwood Public
Works Department Street
Maintenance Division
maintains local roadways 30.

Continue regular maintenance of
roadway surfaces; integrate safety
improvements such as bike lanes
and advanced stop bars into
roadway resurfacing projects.

Transportation Demand
Management
Policies/Programs
The City General Plan lists
Policy CIR I-16 pertaining to
Transportation Demand
Management (TDM).

Coordinate with the Contra Costa
County Transportation Authority to
review strategies to
implement/improve local TDM
programs.

Use of overlays, specific
plans, redevelopment
areas to encourage infill
development to reduce
VMT
City follows direction in SB
743 regarding VMT31.

Identify areas where infill
development will require safety
improvements; Coordinate with
County to ensure connectivity and
continuation of safety amenities
with other municipalities.

Regular Collection of
Traffic / Bicycle /
Pedestrian Volumes
On a case-by-case basis32.

Require bicycle and pedestrian
counts as part of routine traffic
counting policies for the City when
traffic impact studies or
environmental documents are
being developed.

Program for Installing
Wayfinding Signage Yes (On a project basis).

Utilize solar-powered digital
bulletin boards to advertise traffic
safety best practices or
wayfinding. Coordinate with
Contra Costa County to
implement branded wayfinding
program; Identify key City
destinations and access route.

Warrants for Traffic
Control Devices Uses CA MUTCD10warrants.

Continue to use CA MUTCD
warrants; Where frequent citizen
requests are not covered by
existing warrants, consider
developing local warrants to
facilitate decision making.
30 City of Brentwood, 2025, Street Maintenance, Available at https://www.brentwoodca.gov/government/public-works/street-maintenance 31 City of Brentwood, 2024, CITY COUNCIL AGENDA ITEM NO. I.2 10/22/2024 - Planning Commission request regarding standards and methodology for Vehicle Miles Traveled (VMT), Available at https://pubbrentwood.escribemeetings.com/filestream.ashx?DocumentId=23472 32 City of Brentwood, 2024, Traffic Volumes, Available at https://www.brentwoodca.gov/government/engineering/traffic-transportation/traffic-volumes

Page 106 of 590 ends

City of Brentwood LRSP Appendix C (vii) May 2025
Topic Current Status Implement or Enhance
School Zone Safety Enforced by PD33.

Continue enforcement of road
safety in school zones; Seek grant
funding opportunities for
additional personnel in school
zones.

Crosswalk Safety
Crossing guard program is
overseen by the City but
managed by a crossing guard
contractor company.

Increase the deployment of
crossing guards at critical
locations along school routes;
review the public comments
received regarding school safety.

Create a webpage on the City
website regarding the City’s
crossing guard program. Increase
enforcement of safe driving and
active transportation behaviors
near busy crosswalk locations;
Update pedestrian crossing design
standards in accordance with
latest best practices. Seek grant
funding for additional
enforcement near high pedestrian
activity locations.
33 City of Brentwood, 2025, School Resource Officer, Available at https://www.brentwoodca.gov/government/police/community-youth-outreach/school-resource-officer

Page 107 of 590 ends

RESOLUTION 21-40-G (Rev 2)
RE: ADOPTION OF THE CONTRA COSTA COUNTYWIDE TRANSPORTATION SAFETY POLICY

AND IMPLEMENTATION GUIDE (GUIDE) FOR LOCAL AGENCIES
WHEREAS, walking, rolling (e.g., micromobility devices such as electric scooters and neighborhood electric vehicles), and bicycling can benefit air quality by reducing traffic congestion, greenhouse gas emissions, air pollutants, and energy use from vehicles, and can provide a safe, convenient, healthy, active, and affordable alternative to the Single-Occupant Vehicle (SOV), serving as first and last multi-mile multimodal physically protected connections, that increase transit ridership, that should be more effectively encouraged locally and prioritized given that the majority of the average household’s total trips traveled are shorter distance; and
WHEREAS, on July 18, 2018, the Authority Board adopted Resolution 18-45-G and the Countywide Bicycle and Pedestrian Plan (CBPP), including Appendices such as a List of Locally Sponsored Projects (Appendix D) which, as amended, will be publicly accessible via the agency website and considered as part of the Safe Streets and Roads for All (Fiscal Year 2025) Program’s Comprehensive Safety Action Plan (checklist certification) as it accompanies this Guide, along with Community-Based Transportation Plans (CBTPs), subregional Action Plans, and the Countywide Comprehensive Transportation Safety Action Plan (CCTSAP); and WHEREAS, human life and health are paramount and should take priority, e.g., when addressing objectives of the publicly accessible transportation system and prioritizing uses of the publicly accessible Right-of-Way (ROW); and
WHEREAS, the intent of the Guide, along with the CBPP, and this agency’s work, is to be consistent with the Core Elements of Vision Zero, speed management, and the Safe Systems Approach, including prioritizing human safety over speed (and over movement of vehicular volume / throughput) providing adequate (distracted driver) reaction time and visibility, and accommodating inevitable mistakes; and
WHEREAS, transportation systems, policies, and projects should be designed and implemented first to protect people, health and human life, and the collective greater good in maximizing public benefit in the public ROW, first through redundancies and shared responsibilities before private interests so that no traffic incident will result in a fatal or severe injury; and

Page 108 of 590 ends

Resolution 21-40-G (Rev 2)
December 18, 2024

Page 2 of 4 ends

WHEREAS, a multimodal hierarchical pyramid, in order from the widest point to the narrowest, should be prioritized by pedestrians, bicyclists, micromobility, middle modalism, transit, and vehicle occupants; and
WHEREAS, investments within the Safe Systems hierarchical pyramid should be focused in order from the widest point to the narrowest: the built environment, latent safety strategies, active safety strategies, and education; and
WHEREAS, the Countywide Vision Zero Working Group (VZWG) was convened in December 2019, February and October 2020, and May 2021 to steer development of the Guide, under the CBPP, and in November 2023 and December 2024 to steer development of the CCTSAP and CBPP project list prioritization; and
WHEREAS, actions to make Contra Costa County’s streets, pathways, and trails safer for all user types, particularly those who are most physically vulnerable, such as pedestrians, bicyclists, people using personal mobility devices, seniors, youth, and people with disabilities, will further encourage people of all ages and abilities to walk, bicycle, roll, and ride transit; and WHEREAS, the key goals identified in the CBPP include: 1) increasing safety and security for pedestrians and bicyclists; 2) create a safe, connected, and comfortable network of bikeways and walkways for all ages and abilities; 3) equitably serve all of Contra Costa County communities while ensuring that public investments are focused on projects with the greatest benefits; and 4) expand safe, convenient, and affordable alternatives to SOVs; and WHEREAS, the key objectives indicated in the CBPP are as follows: 1) reduce the rate of pedestrian and bicyclist fatal and severe injuries; 2) increase the number of miles of low-stress bikeways in Contra Costa County; and 3) integrate Complete Streets principles and best practices into Authority funding and design guidance; and WHEREAS, the priorities indicated in the CBPP (Table 7-1) include the following: emphasis on selecting projects of countywide significance; taking into account project alternatives and cost effectiveness in achieving project objectives; weighing network expansion versus existing network completion or maintenance; gap closures and improved connectivity (to, from, and between residential, parks and recreational destinations or routes, outdoor open spaces, transit, shopping, schools, and employment locations); range and number of users (all ages and abilities, transit riders); increased transit ridership; latent demand; local community and policy support; deliverability, readiness, and feasibility; and leveraging matching fund sources; and WHEREAS, the Countywide Bicycle and Pedestrian Advisory Committee prioritizes building out long-distance travel routes with a focus on establishing and maintaining a safer, contiguous

Page 109 of 590 ends

Resolution 21-40-G (Rev 2)
December 18, 2024

Page 3 of 4 ends

countywide Low-Traffic-Stress Network (mainly Class I and Class IV bicycle facilities) per the CBPP; and
WHEREAS, the first implementation action in the CBPP was to develop a countywide Vision Zero and a systematic safety approach for Contra Costa County to a countywide Vision Zero Policy, and systematic pedestrian and bicyclist safety analyses, using a data-informed and systemic assessment of the common patterns of fatal and severe traffic injuries in Contra Costa County. In addition, the Authority would support its partners in identifying efficient and costeffective engineering and non-engineering strategies, including implementing proven countermeasures to assist jurisdictions to more efficiently address the public health crisis; and WHEREAS, the countywide Vision Zero and Safety Policy Statement in Resolution No. 4400, adopted by the Metropolitan Transportation Commission (MTC) on June 12, 2020, is to work together with partner agencies, with a goal to move toward Vision Zero, to encourage and support equitable and data-informed actions toward eliminating fatal and serious (severe, lifealtering, and traumatic) traffic injuries for the Bay Area region, by which the adoption and use of the Guide is anticipated to make Contra Costa County jurisdictions more competitive when competing for federal, State, and regional funding; and WHEREAS, the Guide for local agencies provides a consistent countywide framework, with a hybrid reactive and increasingly proactive Safe Systems Approach to address safety, exposure, and risk management; and
WHEREAS, the nine-county regional MTC, cities of San Francisco, Oakland, San Jose, Fremont, Alameda, and counties of Sonoma and Contra Costa (unincorporated communities) are among the first 52 jurisdictions in the United States working toward Vision Zero; and WHEREAS, the California Department of Transportation Strategic Highway Safety Plan, which guides safety funding and strategy for the state of California, is in support of Vision Zero and the Safe Systems Approach that includes a system-wide method of project development for transportation infrastructure such as intersections, sidewalks, bike lanes, and trail crossings where common characteristics that cause fatal or severe injury collisions exist at multiple locations.

NOW, THEREFORE, BE IT RESOLVED, that the Authority Board hereby:
1) Adopts the CBPP, subregional Action Plans, CBTPs, CCTSAP, and Guide collectively as a Vision Zero Comprehensive Safety Action Plan.
2) Affirms its commitment to urgently implement travel independence and peoplePage 110 of 590 Resolution 21-40-G (Rev 2)
December 18, 2024

Page 4 of 4 ends

centered policies and the core elements of Vision Zero and the data-informed Safe Systems Approach (which, among other preventive strategies, focuses on other locations that have similar characteristics of street or public ROW infrastructure, or driver behavior, when/as compared to higher collision rate locations) as a priority, eliminating preventable fatal and severe injuries, and adopts a target date of December 31, 2034, after first achieving a 50 percent reduction no later than December 31, 2029.
3) Formalizes the existing Ad-Hoc multi-disciplinary VZWG as the advisor to Vision Zero planning and implementation, plan monitoring, priorities, and communications.

This resolution was entered into at a meeting of the Contra Costa Transportation Authority Board held December 18, 2024 in Walnut Creek, California by the following vote:

AYES:

NOES:

ABSENT:

ABSTAIN:

Chair Arnerich and Commissioners Carlson, Glover, Kelley, Meadows, Noack, and Commissioner Alts. Gee and Xavier
None
Commissioner Alts. Obringer and Stepper
None
__________________________________
Newell Arnerich, Chair
Attest: ___________________________________
Tarienne Grover, Clerk of the Board

Page 111 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.4
06/10/2025
SUBJECT: Authorize the City Manager to approve Amendment No. 1 with PowerGen Inc. for an additional $40,000; and to execute an agreement or other necessary documents with Municipal
Maintenance Equipment to increase the purchase order by an additional $30,000
DEPARTMENT: Public Works
STAFF: Casey Wichert, Director of Public Works
Scott Dempsey, Fleet/Facilities Maintenance Manager

TITLE/RECOMMENDATION
Adopt a Resolution approving and authorizing the City Manager or designee to execute Amendment No. 1 with PowerGen Inc. for an additional $40,000, for a total not to exceed amount of $160,000 for FY 2024/25, for emergency back-up generator maintenance and repair services to include, but not be limited to, quarterly testing, annual testing, and load bank testing; and to execute an agreement or other necessary documents with Municipal Maintenance Equipment for an additional $30,000, for a total not to exceed amount of $97,000 for FY 2024/25, for Fleet related parts, supplies, and services for the City’s street sweepers and sewer cleaning trucks, and installation of additional safety equipment on the street sweepers.

FISCAL IMPACT
The increases in the purchase order amounts are summarized as follows:

The Fleet Maintenance Services Fund and the Vehicle and Equipment Replacement Fund have sufficient 2024/25 Operating Budget available for the amendment and purchase order increases.

PowerGen Inc.

Municipal
Maintenance
Equipment
Original Purchase Order Amount $ 120,000 $ 67,000
Increase Funded By:

Fleet Maintenance Services Fund 40,000 9,310
Vehicle and Equipment Replacement Fund 20,690
New Total Not-to-Exceed Purchase Order Amount $ 160,000 $ 97,000

Page 112 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.4
06/10/2025
The Fleet Maintenance Services Fund receives annual contributions from various City funds in order to ensure sufficient resources are available. Annual funding in the Operating Budget is provided by the Enterprise Funds (78%), General Fund (16%), and Other Funds (5%).

The Vehicle and Equipment Replacement Fund receives annual contributions from various City funds in order to ensure sufficient resources are available when replacement is needed. Annual funding in the Operating Budget is provided by the Enterprise Funds (57%), General Fund (38%), and Other Funds (5%).

BACKGROUND
As part of the budget adoption, City staff includes budgeted amounts for the maintenance and repair of city vehicles and equipment. The Council/Administrative Policy No. 10-7 (‘Purchasing Policy’) requires that purchases of goods or services over $50,000 per vendor, per fiscal year must be approved by the City Council. Public Works currently has purchase orders with PowerGen Inc. for $120,000 for emergency back-up generator maintenance and repair services, and with Municipal Maintenance Equipment for $67,000 for parts, maintenance and repair services for the City’s Street Sweepers and Sewer cleaning trucks.

The Fleet Maintenance Division maintains the City’s vehicle and equipment fleet, which includes the City’s nineteen emergency back-up generators. PowerGen Inc. was the lowest responsible bidder for emergency back-up generator maintenance and repair services and are utilized as needed. Municipal Maintenance Equipment is the authorized Northern California Dealer for the City’s Schwarze Street Sweepers and Vaccon Sewer cleaning trucks.

As the City continues to grow, the City’s fleet size and maintenance requirements increase, as well. There have been several unanticipated major repairs that were contracted out to PowerGen Inc. and Municipal Maintenance Equipment since July 2024, including but not limited to a control panel replacement, a transfer switch replacement, capacitor replacement, and installation of safety equipment and monitoring devices.

Due to the increased need and cost of repairs, services and parts, staff is requesting an increase to purchase orders with these vendors (including approval of an amendment with PowerGen Inc., and agreement or other necessary documents with Municipal Maintenance Equipment, as required) in order to have sufficient funds for the remainder of this fiscal year.

Page 113 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.4
06/10/2025

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

DATE OF NOTICE
Not Applicable.

ENVIRONMENTAL DETERMINATION
Not Applicable.

ALTERNATIVE OPTION(S)
Alternatives to the staff recommendation:

1. Continue item with direction for staff to return with additional information.

ATTACHMENT(S)

1. Previous Action

2. Resolution

Page 114 of 590 ends

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On October 27, 2022, by Ordinance No. 1045, the City Council adopted the Purchasing Policy No. 10-7.

On June 25, 2024, by Resolution 2024-73, the City Council adopted the FY 2024/25 – 2025/26 Operating Budget.

On June 25, 2024, by Resolution 2024-67 and 2024-03-SA, the City Council of the City of Brentwood and the Successor Agency Board approved and authorized the City Manager or City Attorney and Executive Director or General Counsel as appropriate, to execute agreements, purchase orders and/or change orders for ongoing and/or recurring purchases that have anticipated spending over $50,000 (City Manager and Executive Director) and $75,000 (City Attorney and General Counsel) for FY2024/25, after approval as to form by the City Attorney or General Counsel, for the not-toexceed dollar amounts with specified vendors.

On January 28, 2025, by Resolution 2025-10, the City Council adopted the amended FY 2024/25 Operating Budget.

On January 28, 2025, by Resolution 2025-07 and 2025-02-SA, the City Council of the City of Brentwood and the Successor Agency Board approved and authorized the City Manager or City Attorney and Executive Director or General Counsel as appropriate, to execute agreements, purchase orders and/or change orders for ongoing and/or recurring purchases that have anticipated spending over $50,000 (City Manager and Executive Director) and $75,000 (City Attorney and General Counsel) for FY2024/25, after approval as to form by the City Attorney or General Counsel, for the updated not-to-exceed dollars amounts with specified vendors.

Page 115 of 590 ends

RESOLUTION NO. 2025-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

BRENTWOOD APPROVING AND AUTHORIZING THE CITY
MANAGER OR DESIGNEE TO EXECUTE AMENDMENT NO. 1 WITH
POWERGEN INC. FOR AN ADDITIONAL $40,000 FOR A TOTAL
NOT TO EXCEED AMOUNT OF $160,000 FOR FY 2024/25, FOR

EMERGENCY BACK-UP GENERATOR MAINTENANCE AND REPAIR

SERVICES TO INCLUDE, BUT NOT LIMITED TO, QUARTERLY
TESTING, ANNUAL TESTING, AND LOAD BANK TESTING; AND TO

EXECUTE AN AGREEMENT OR OTHER NECESSARY DOCUMENTS

WITH MUNICIPAL MAINTENANCE EQUIPMENT FOR AN
ADDITIONAL $30,000, FOR A TOTAL NOT TO EXCEED AMOUNT
OF $97,000 FOR FY 2024/25, FOR FLEET RELATED PARTS,
SUPPLIES AND SERVICES FOR THE CITY’S STREET SWEEPERS

AND SEWER CLEANING TRUCKS, AND INSTALLATION OF

ADDITIONAL SAFETY EQUIPMENT ON THE STREET SWEEPERS
WHEREAS, on October 27, 2022, by Ordinance No. 1045, the City Council adopted the Purchasing Policy No. 10-7; and
WHEREAS, on June 25, 2024, by Resolution 2024-73, the City Council adopted the FY 2024/25 – 2025/26 Operating Budget; and
WHEREAS, on June 25, 2024, by Resolution 2024-67 and 2024-03-SA, the City Council of the City of Brentwood and the Successor Agency Board approved and authorized the City Manager or City Attorney and Executive Director or General Counsel as appropriate, to execute agreements, purchase orders and/or change orders for ongoing and/or recurring purchases that have anticipated spending over $50,000 (City Manager and Executive Director) and $75,000 (City Attorney and General Counsel) for FY2024/25, after approval as to form by the City Attorney or General Counsel, for the not-to-exceed dollar amounts with specified vendors; and WHEREAS, on January 28, 2025, by Resolution 2025-10, the City Council adopted the amended FY 2024/25 Operating Budget; and
WHEREAS, on January 28, 2025, by Resolution 2025-07 and 2025-02-SA, the City Council of the City of Brentwood and the Successor Agency Board approved and authorized the City Manager or City Attorney and Executive Director or General Counsel as appropriate, to execute agreements, purchase orders and/or change orders for ongoing and/or recurring purchases that have anticipated spending over $50,000 (City Manager and Executive Director) and $75,000 (City Attorney and General Counsel) for FY2024/25, after approval as to form by the City Attorney or General Counsel, for the updated not-to-exceed dollars amounts with specified vendors.

Page 116 of 590 ends
Page 2 of 2 ends

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood approves and authorizes the City Manager or designee to execute:

1. Amendment No. 1 with PowerGen Inc., for an additional $40,000, for a total not to exceed amount of $160,000 for FY 2024/25, for emergency back-up generator maintenance and repair services to include, but not be limited to, quarterly testing, annual testing, and load bank testing; and

2. An agreement or other necessary documents with Municipal Maintenance Equipment for an additional $30,000, for a total not to exceed amount of $97,000 for FY 2024/25, for Fleet related parts, supplies and services for the City’s street sweepers and sewer cleaning trucks, and installation of additional safety equipment on the street sweepers.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 10th day of June 2025 by the following vote:

Page 117 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.5
06/10/2025
SUBJECT: Consider appointment of new Commissioners to the City of Brentwood Youth Commission
DEPARTMENT: Parks and Recreation
STAFF: Vatsal Patel, Acting Parks and Recreation Director Thien Nguyen, Recreation Manager
Stacey Dempsey, Recreation Supervisor

TITLE/RECOMMENDATION
Appoint new Commissioners to the Brentwood Youth Commission.

FISCAL IMPACT
There is no fiscal impact associated with this action.

BACKGROUND
The Brentwood Youth Commission consists of ten (10) members. The body’s purpose is to “to provide a voice for youth in the community; actively empower youth by supporting and providing programs, activities and initiatives; and create a positive and motivating environment for youth to prosper in the community.” (Brentwood Municipal Code § 2.50.070(A).) To qualify to serve as a Commissioner, an individual must, at the time of the appointment, be between eleven and eighteen years of age and a city resident. (Brentwood Municipal Code § 2.50.020(A).) Vacancies were advertised on the City website, as well as the middle and high schools. Two (2) completed applications were received by the original April 4, 2025 deadline, so the application period was extended until May 2, 2025. Seven (7) completed applications were received by the extended deadline, and those applicants were interviewed on May 21, 2025. The interviews were conducted by an interview panel consisting of a Park and Recreation Commissioner, the Youth Commission Staff Liaison, and one Youth Commissioner, as stated in the Youth Commission By-Laws.

Five (5) Commissioner terms will begin July 1, 2025 and end June 30, 2027.

The Youth Commission is recommending to the City Council the following applicants to fill the five (5) vacant Commissioner positions:

Page 118 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.5
06/10/2025
Owen Spishock 2-year term (returning member)
Aaroah Ranjan 2-year term (new member)
Amara Espinosa 2-year term (new member)
Sahil Narula 2-year term (new member)
Manya Mohan 2-year term (new member)

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

DATE OF NOTICE
Not Applicable.

ENVIRONMENTAL DETERMINATION
Not Applicable.

ALTERNATIVE OPTION(S)
The City Council may request additional information to return to a future City Council meeting. Existing Commissioners’ current terms expire on June 30, 2025; however, all Commissioners serve until a successor is named, unless removed by the City Council. (Brentwood Municipal Code § 2.50.020(C).)

ATTACHMENT(S)

1. Previous Action

Page 119 of 590 ends

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On June 11, 2024, the City Council appointed the following Youth Commissioners to two-year terms beginning July 1, 2024: Megan Dowdy, Rojan Habon, Carena Helvey, Rachel Lei, and Alana Osivwemu; and the following Youth Commissioner to a oneyear term beginning July 1, 2024: Valentina Barros.

Page 120 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.6
06/10/2025
SUBJECT: Adopt a Resolution delegating annual management responsibility for the investment program to the City Treasurer for FY 2025/26 and make additional amendments to Council Administrative Policy 10-4, Investment Policy
DEPARTMENT: Finance and Information Systems
STAFF: Kerry Breen, Director of Finance and Information Systems Sonia Agostini, Accounting Manager
Clarissa Domen, Accountant II

TITLE/RECOMMENDATION
Adopt a Resolution delegating annual management responsibility for the investment program to the City Treasurer for FY 2025/26 and make additional amendments to Council Administrative Policy 10-4, Investment Policy.

FISCAL IMPACT
There is no fiscal impact associated with staff’s recommended action. The City’s current managed investment portfolio totals approximately $234 million, with an additional $118 million in short term liquidity pools earning approximately 4.4% annual interest.

BACKGROUND
Council/Administrative Policy No 10-4, Investment Policy (the “Policy”), provides the City Council authority to delegate investment program management to the City Treasurer on an annual basis. Section 14 of the Policy requires 1) an annual review of the Policy by the City Council at a public meeting and 2) any changes to the Policy be considered by City Council also at a public meeting. Section 5 of the Policy delegates investment management responsibility to the City Treasurer/Director of Finance and Information Systems for a one-year period and requires this responsibility to be renewed annually.

Staff reviewed the City’s Policy and consulted with the City’s investment management firm, PFM Asset Management, LLC (“PFMAM”). PFMAM stated the Policy is in compliance with the sections of the California Government Code that govern the investment of public funds. However, PFMAM recommended the following modifications to the Glossary of Terms section of the Policy to 1) update the name of one of the rating services, from “Standard and Poor’s” to “S&P Global”; and 2) put

Page 121 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.6
06/10/2025
the Glossary of Terms in alphabetical order. Staff further recommends a clarification to the definition of “trustee.” These changes are indicated in the redline draft attached as Exhibit A to the Resolution accompanying this staff report.

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

DATE OF NOTICE
Not Applicable.

ENVIRONMENTAL DETERMINATION
Not Applicable.

ALTERNATIVE OPTION(S)
Alternative Options to the Staff Recommendation:

1. Modify staff’s recommendation based on City Council direction.

2. Continue item with direction for staff to return with additional information.

ATTACHMENT(S)

1. Previous Action

2. Resolution

3. EXHIBIT A – Council/Administrative Policy No. 10-4, Investment Policy

Page 122 of 590 ends

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On May 28, 2024, the City Council approved Resolution 2024-54, delegating management responsibility for the investment program to the City Treasurer.

Page 123 of 590 ends

RESOLUTION NO. 2025-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

BRENTWOOD DELEGATING ANNUAL MANAGEMENT

RESPONSIBILITY FOR THE INVESTMENT PROGRAM TO THE CITY
TREASURER FOR FISCAL YEAR 2025/26 AND AMENDING
COUNCIL/ADMINISTRATIVE POLICY NO. 10-4, INVESTMENT
POLICY
WHEREAS, the Council/Administrative Policy No. 10-4, Investment Policy (“Policy”) requires an annual review by the City Council at a public meeting; and WHEREAS, the Policy requires that management responsibility for the investment program be delegated on an annual basis to the City Treasurer; and WHEREAS, the Policy has been reviewed by the City’s external investment management firm; and
WHEREAS, the Policy has been updated to reflect recommended clarifications in terminology; and
WHEREAS, the Policy is in compliance with all applicable California Government Code provisions regulating the investment of public funds.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood hereby delegates annual management responsibility for the investment program to the City Treasurer for Fiscal Year 2025/26; and amends Council/Administrative Policy No. 10-4, Investment Policy, in the manner set forth in Exhibit A attached hereto and incorporated herein.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 10th day of June 2025 by the following vote:

Page 124 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 1 of 13 ends

TABLE OF CONTENTS
Section Page

1. Introduction .......................................................................................................................... 2

2. Scope ................................................................................................................................... 2

3. Prudence ............................................................................................................................. 2

4. Objectives ............................................................................................................................ 2

4.1 Safety ...................................................................................................................... 2

4.2 Liquidity ................................................................................................................... 2

4.3 Return on Investment .............................................................................................. 2

5. Delegation of Authority ......................................................................................................... 2

6. Ethics and Conflict of Interest ............................................................................................... 3

7. Permitted Investment Instruments ........................................................................................ 3

7.1 U.S. Treasuries ........................................................................................................ 3

7.2 U.S. Agency Obligations .......................................................................................... 3

7.3 California State & Local Agency Obligations ............................................................ 3

7.4 Other State Obligations............................................................................................ 3

7.5 Repurchase Agreements ......................................................................................... 4

7.6 Reverse Repurchase Agreements ........................................................................... 4

7.7 Bankers’ Acceptances ............................................................................................. 5

7.8 Commercial Paper ................................................................................................... 5

7.9 Medium-Term Notes ................................................................................................ 5

7.10 Time Deposits ......................................................................................................... 6

7.11 Negotiable Certificates of Deposit ........................................................................... 6

7.12 State of California’s Local Agency Investment Fund ............................................... 6

7.13 Insured Savings Account ........................................................................................ 6

7.14 Local Government Investment Pools ...................................................................... 6

7.15 Money Market Funds .............................................................................................. 6

7.16 Supranationals .................................................................................................................. 7

7.17 Asset-Backed Securities .......................................................................................... 7

8. Prohibited Investments ......................................................................................................... 7

9. Maximum Maturity ................................................................................................................ 7

10. Reporting Requirements ......................................................................................................... 8

11. Internal Controls ...................................................................................................................... 8

12. Performance Standards .......................................................................................................... 8

13. Safekeeping and Custody .................................................................................................... 8

14. Annual Review of Policy ....................................................................................................... 8

15. Glossary of Terms ............................................................................................... 9

EXHIBIT A

Page 125 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 2 of 13 ends

1. Introduction
The purpose of this document is to identify various policies and procedures that enhance opportunities for a prudent and systematic investment policy and to organize and formalize investment-related activities.

The investment policies and practices of the City of Brentwood are based on state law and prudent money management. All funds will be invested in accordance with the City of Brentwood's Investment Policy, and California Government Code Sections 53601 and 53646. The investment of bond proceeds will be governed by the provisions of relevant bond documents.

2. Scope
It is intended that this policy cover all funds (except bond proceeds and retirement funds) and investment activities under the direction of the Brentwood City Council.

3. Prudence
The Treasurer and City Council are trustees and therefore fiduciaries subject to the prudent investor standard. When investing, reinvesting, purchasing, acquiring, exchanging, selling, or managing public funds, a trustee shall act with care, skill, prudence, and diligence under the circumstances then prevailing, including, but not limited to, the general economic conditions and the anticipated needs of the City, that a prudent person acting in a like capacity and having familiarity with those matters would use in the conduct of funds of a like character and with like aims, to safeguard the principal and maintain the liquidity needs of the City.

4. Objectives
The primary objectives, in priority order, of the investment activities of the City of Brentwood shall be:

4.1 Safety. Safety of principal is the foremost objective of the investment program.

Investments of the City of Brentwood shall be undertaken in a manner that seeks to ensure preservation of capital in the portfolio.

4.2 Liquidity. The investment portfolio of the City of Brentwood will remain sufficiently liquid to enable the City to meet its cash flow requirements.

4.3 Return On Investment. The investment portfolio of the City of Brentwood shall be designed with the objective of attaining a market rate of return on its investments consistent with the constraints imposed by its safety objective and cash flow considerations.

5. Delegation of Authority
The management responsibility for the investment program is hereby delegated to the Treasurer for a one-year period, subject to review and renewable annually. The Treasurer shall monitor and review all investments for consistency with this investment

Page 126 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 3 of 13 ends

policy. No person may engage in an investment transaction except as provided under the limits of this policy. The Treasurer may delegate its investment decision making and execution authority to an investment advisor. The advisor shall follow the policy and such other written instructions as are provided.

6. Ethics and Conflict of Interest
Officers and employees involved in the investment process shall refrain from personal business activities that could conflict with proper execution of the investment program, or which could impair their ability to make impartial decisions.

7. Permitted Investment Instruments
The City shall limit investments in any one non-government issuer, except investment pools, to no more than 5% regardless of security type.

7.1 U.S. Treasuries: United States Treasury notes, bonds, bills, or certificates of indebtedness, or those for which the full faith and credit of the United States are pledged for the payment of principal and interest.

7.2 U.S. Agency Obligations: Federal agency or United States government- sponsored enterprise obligations, participations, or other instruments, including those issued by or fully guaranteed as to principal and interest by federal agencies or United States government-sponsored enterprises.

7.2.1 Any mortgage pass through security issued and guaranteed by a Federal Agency with a maximum final maturity of five years, provided that these securities are rated in a rating category of “AA”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a nationally recognized statistical rating organization (“NRSRO”). Purchase of securities authorized by this subdivision may not exceed 20 percent of the City's investment portfolio.

7.3 California State & Local Agency Obligations: Obligations of the State of California or any local agency within the state, including bonds payable solely out of revenues from a revenue-producing property owned, controlled or operated by the state or any local agency or by a department, board, agency, or authority of the state or any local agency provided that these securities are rated in a rating category of “A”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO. Purchase of securities authorized by this subdivision when combined with purchases authorized by subdivision 7.4 may not exceed 30 percent of the City’s investment portfolio.

7.4 Other State Obligations: Registered treasury notes or bonds of any of the other 49 United States in addition to California, including bonds payable solely out of the revenues from a revenue-producing property owned, controlled, or operated by a state or by a department, board, agency, or authority of any of the other 49 United

Page 127 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 4 of 13 ends

States, in addition to California, provided that these securities are rated in a rating category of “A”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO. Purchase of securities authorized by this subdivision when combined with purchases authorized by subdivision 7.3 may not exceed 30 percent of the City’s investment portfolio.

7.5 Repurchase Agreements: Repurchase Agreements used solely as short-term investments not to exceed 90 days.

The following collateral restrictions will be observed: Only U.S. Treasury securities or Federal Agency securities as described in 7.1 and 7.2 will be acceptable collateral. All securities underlying Repurchase Agreements must be delivered to the City's custodian bank versus payment or be handled under a tri-party repurchase agreement. The total of all collateral for each Repurchase Agreement must equal or exceed, on the basis of market value plus accrued interest, 102 percent of the total dollar value of the money invested by the City of Brentwood for the term of the investment.

For any Repurchase Agreement with a term of more than one day, the value of the underlying securities must be reviewed on a regular basis, but no less frequently than quarterly. Market value must also be calculated each time there is a substitution of collateral. Any deficiency in the market valuation of the underlying securities must be made up no later than the business day following the valuation.

The City of Brentwood or its trustee shall have a perfected first security interest under the Uniform Commercial Code in all securities subject to Repurchase Agreement.

The City of Brentwood may enter into Repurchase Agreements with (1) primary dealers in U.S. Government securities who are eligible to transact business with, and who report to, the Federal Reserve Bank of New York, and (2) California and nonCalifornia banking institutions having assets in excess of $1 billion and in the highest short-term rating category as provided by a NRSRO.

The City of Brentwood will have specific written agreements with each firm with which it enters into Repurchase Agreements.

7.6 Reverse Repurchase Agreements: Reverse repurchase agreements will not be allowed without the prior approval of the City Council. If a reverse repurchase agreement is approved, the following guidelines will be applied: The City may invest in reverse repurchase agreements only with "primary dealers" with which the City has entered into a master repurchase agreement contract. The City may invest in reverse repurchase agreements with the following conditions: The City may only use reverse repurchase agreements to (1) cover a temporary cash shortage, or (2) augment earnings. Reverse repurchase agreements may not be used to leverage the portfolio.

Page 128 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 5 of 13 ends

In addition, if a reverse repurchase agreement is authorized, it may be utilized only if the security to be sold on reverse repurchase agreement has been owned and fully paid for by the City for a minimum of 30 days prior to the sale; the total of all reverse repurchase agreements on investments owned by the City does not exceed 20% of the City’s investment portfolio; and the agreement does not exceed a term of 92 days, unless the agreement includes a written codicil guaranteeing a minimum earning or spread for the entire period between the sale of the security using a reverse repurchase agreement and the final maturity date of the same security.

The proceeds of the reverse repurchase agreement may not be invested in securities whose maturity exceeds the term of the Reverse Repurchase Agreement.

7.7 Bankers' Acceptances: Bankers' Acceptances issued by domestic or foreign banks, which are eligible for purchase by the Federal Reserve System, provided that these securities are rated in the highest short-term rating category by a NRSRO. Bankers’ Acceptances may not exceed 180 days maturity. Purchase of securities authorized by this subdivision may not exceed 40 percent of the City of Brentwood's investment portfolio.

7.8 Commercial Paper: Commercial paper of “prime” quality of the highest letter and number rating as provided for by a NRSRO. The entity that issues the commercial paper shall meet all of the following conditions in either paragraph (1) or paragraph (2):
(1) The entity meets the following criteria: (A) Is organized and operating in the United States as a general corporation. (B) Has total assets in excess of five hundred million dollars ($500,000,000). (C) Has debt other than commercial paper, if any, that is rated in a rating category of “A”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO.
(2) The entity meets the following criteria: (A) Is organized within the United States as a special purpose corporation, trust, or limited liability company. (B) Has program wide credit enhancements, including, but not limited to, over collateralization, letters of credit or a surety bond. (C) Has commercial paper that is rated in a rating category of “A-1” or higher, or the equivalent, by a NRSRO.

Eligible commercial paper shall have a maximum maturity of 270 days or less.

The City shall be subject to the following concentration limits:
(1) Effective until January 1, 2026, no more than 40 percent of the City‘s money may be invested in eligible commercial paper.
(2) After January 1, 2026, no more than 25 percent of the City’s money may be invested in eligible commercial paper.

7.9 Medium-Term Notes: Medium-term corporate notes defined as all corporate and depository institution debt securities with a maximum remaining maturity of five years or less, issued by corporations organized and operating within the United States or by depository institutions licensed by the U.S. or any state and operating within the U.S.

Page 129 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 6 of 13 ends

Medium-term notes shall be rated in a rating category of “A”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO. Purchase of medium-term corporate notes may not exceed 30 percent of the City's investment portfolio.

7.10 Time Deposits: FDIC insured or fully collateralized time certificates of deposit in financial institutions located in California, including U.S. branches of foreign banks licensed to do business in California. All time deposits must be collateralized in accordance with the California Government Code section 53652. Purchase of time deposits shall not exceed 25% of the City's investment portfolio.

7.11 Negotiable Certificates of Deposit: Negotiable certificates of deposit or deposit notes issued by a nationally or state-chartered bank or a state or federal association as defined in Section 5102 of the Financial Code or by a state-licensed branch of a foreign bank; provided that the senior debt obligations of the issuing institution are rated in a rating category of “A” long-term or “A-1” short-term, the equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO. Purchase of negotiable certificates of deposit may not exceed 30 percent of the City of Brentwood's investment portfolio.

7.12 State of California's Local Agency Investment Fund: The City may invest in the Local Agency Investment Fund (LAIF) established by the State Treasurer for the benefit of local agencies. The City may invest up to the maximum deposit limit per account as permitted by the LAIF Investment Advisory Board. The LAIF portfolio should be reviewed periodically.

7.13 Insured Savings Account

7.14 Local Government Investment Pools: Shares of beneficial interest issued by a joint powers authority organized pursuant to California Government Code Section 6509.7 that invests in the securities and obligations authorized in California Government Code Section 53601 subdivisions (a) to (r), inclusive. Each share shall represent an equal proportional interest in the underlying pool of securities owned by the joint powers authority. To be eligible under this section, the joint powers authority issuing the shares shall have retained an investment adviser that meets all of the following criteria: (1) The adviser is registered or exempt from registration with the Securities and Exchange Commission. (2) The adviser has not less than five years of experience investing in the securities and obligations authorized in California Government Code Section 53601 subdivisions (a) to (q), inclusive. (3) The adviser has assets under management in excess of five hundred million dollars ($500,000,000).

7.15 Money Market Funds: Shares of beneficial interest issued by diversified management companies that are money market funds registered with the Securities and Exchange Commission under the Investment Company Act of 1940 (15 U.S. C. Sec. 80a-1, et seq.). The company must have met either of the following criteria: (1) attained the highest ranking letter and numerical rating provided by not less than two NRSROs or (2) have an investment advisor registered with the Securities and Exchange Commission with not less than five years' experience managing money market mutual funds with assets under management in excess of $500,000,000. Page 130 of 590

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 7 of 13 ends

The purchase price of shares shall not exceed 15 percent of the investment portfolio of the City of Brentwood.

7.16 Supranationals: United States dollar denominated senior unsecured unsubordinated obligations issued or unconditionally guaranteed by the International Bank for Reconstruction and Development, International Finance Corporation, or Inter-American Development Bank, with a maximum remaining maturity of five years or less and eligible for purchase and sale within the United States. Supranationals shall be rated in the rating category of “AA”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO. Purchases of supranationals may not exceed 30% of the City's investment portfolio.

7.17 Asset-Backed Securities: Mortgage pass-through securities, collateralized mortgage obligations, mortgage-backed or other pay-through bonds, equipment lease-backed certificates, consumer receivable pass-through certificates, and consumer receivable-backed bonds. Securities eligible for investment under this subdivision shall be rated in a rating category of “AA”, its equivalent or higher (without regard to any gradations within such categories by numerical qualifier or otherwise) by a NRSRO and have a maximum remaining maturity of five years or less. Purchases of asset-backed securities may not exceed 20% of the City's investment portfolio.

Credit criteria listed in this section refers to the credit of the issuing organization at the time the security is purchased. The maximum percentage limitations apply at the time of purchase.

A security purchased in accordance with this section shall not have a forward settlement date exceeding 45 days from the time of investment.

8. Prohibited Investments
The City may only invest in those obligations authorized by this policy and shall not invest any funds in inverse floaters, range notes, or interest-only strips that are derived from a pool of mortgages, or in any security that could result in zero interest accrual if held to maturity.

Notwithstanding the prohibition in the above paragraph, the City may invest in securities issued by, or backed by, the United States government that could result in zero - or negative - interest accrual if held to maturity, in the event of, and for the duration of, a period of negative market interest rates. The City may hold these instruments until their maturity dates. This paragraph shall remain in effect only until January 1, 2026, and as of that date is repealed.

9. Maximum Maturity
Investment maturities shall be based on a review of cash flow forecasts. Maturities will be scheduled so as to permit the City of Brentwood to meet all projected obligations.

Unless otherwise noted within this investment policy, the City may not invest in a security that exceeds five (5) years from the date of purchase. For purposes of compliance with this Policy, an investment’s term or remaining maturity shall be measured from the settlement date to final maturity. Page 131 of 590

COUNCIL/ADMINISTRATIVE POLICY

10. Reporting Requirements
The City Treasurer or outside Investment Advisor shall generate and present to the Brentwood City Council monthly reports for accounting and management purposes.

Required elements of this report will include:
 Description of investment instrument
 Interest rate or yield to maturity
 Purchase date
 Maturity date
 Purchase price
 Par value
 Current market value as of the date of the report and the source of this valuation
 Overall portfolio yield based on cost
 List of all transactions during the past month
On a quarterly basis, within 45 days following the end of the quarter, a quarterly report will be prepared and rendered to the Brentwood City Council. This report will provide data similar to the monthly data as well as any narrative necessary for clarification. Also, the quarterly report shall state compliance of the portfolio to the statement of investment policy, or manner in which the portfolio is not in compliance. In addition, the City Treasurer will include in this report a statement denoting the ability of the City to meet its expenditure requirements for the next six months, or provide an explanation as to why sufficient money shall, or may not, be available.

11. Internal Controls
The City Treasurer/Director of Finance and Information Systems is responsible for establishing and maintaining an internal control structure designed to ensure the assets of the City are protected from loss, theft, fraud or misuse.

12. Performance Standards
The investment portfolio shall be designed with the objective of obtaining a rate of return throughout budgetary and economic cycles, commensurate with the investment risk constraints and the cash flow needs. The City will measure the portfolio’s performance against a market benchmark that is commensurate with the City’s investment risk constraints and the cash flow characteristics of the portfolio.

13. Safekeeping and Custody
The assets of the City of Brentwood shall be secured through the third-party custody and safekeeping procedures. Bearer instruments shall be held only through third-party institutions. Collateralized securities such as repurchase agreements shall be purchased using the delivery vs. payment procedure.

14. Annual Review of Policy
The Treasurer shall annually render to the City Council this Investment Policy, which shall be considered at a public meeting. Any changes in the policy shall also be considered by the City Council at a public meeting.

Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 8 of 13 ends
Page 132 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY

15. Glossary of Terms

15.1 Glossary: Except as otherwise provided in this policy, whenever the words defined or described in the Glossary attached to this policy are used in this policy, they shall have the same meaning attributed to them in the Glossary. However if there is a conflict between a definition contained in the Glossary and a definition of those same words in Sections 53600 et. seq. of the Government Code, the definition in the Government Code shall govern.

GLOSSARY OF TERMS
ACCRUED INTEREST: Interest that is due on a bond or other fixed income security since the last interest payment was made. This often occurs for bonds purchased on the secondary market, since bonds usually pay interest every six months, but the interest is accrued by the bondholders on a day-to-day basis. When a bond is sold, the buyer pays the seller the market price plus the accrued interest, for which the buyer will be reimbursed when the issuer next pays interest.

Accrued interest is calculated on a 30-day month/360-day year for corporate bonds and municipal bonds, and on actual-calendar-days for Government bonds. Income bonds and bonds in default trade without accrued interest. When calculating accrued interest on a bond that is being sold, it is conventional to consider the time period from the most recent payment up to, but not including, the date on which the bond sale is settled.

AGENCIES: Federal agency securities and/or Government-sponsored enterprises.

ASSET-BACKED SECURITIES: Bonds created from various types of consumer debt. Returns on these securities come from customer payments on their outstanding loans. The primary types of asset-backed securities are mortgages, home equity loans, auto loans, leases, credit card receivables and student loans.

BANKERS’ ACCEPTANCE: A draft or bill or exchange accepted by a bank or trust company.

The accepting institution guarantees payment of the bill, as well as the insurer.

BOND: A certificate of debt that is issued by a government or corporation in order to raise money with a promise to pay a specified sum of money at a fixed time in the future and carrying interest at a fixed rate. Generally, a bond is a promise to repay the principal along with interest (coupons) on a specified date (maturity). The main types of bonds are corporate bond, municipal bond, treasury bond, treasury note, treasury bill, and zero-coupon bond. It is a tradable debt instrument that might be sold at, above or below par (the amount paid out at maturity), and are rated by bond rating services such as Standard & Poor's S&P Global and Moody's Investors Service, to specify likelihood of default. The Federal government, states, cities, corporations, and many other types of institutions sell bonds. It is relatively more secured than equity and has priority over shareholders if the company becomes insolvent and its assets are distributed.

Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 9 of 13 ends
Page 133 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 10 of 13 ends

COLLATERAL: Assets pledged by a borrower to secure a loan or other credit, and subject to seizure in the event of default.

COMMERCIAL PAPER: An unsecured obligation issued by a corporation or bank to finance its short-term credit needs, such as accounts receivable and inventory. Maturities typically range from 2 to 270 days. Commercial paper is available in a wide range of denominations, can be either discounted or interest-bearing, and usually have a limited or nonexistent secondary market. Commercial paper is usually issued by companies with high credit ratings, meaning that the investment is almost always relatively low risk.

CUSTODIAN: An agent, bank, trust company, or other organization which holds and safeguards an individual's, mutual funds, or investment company's assets for them.

DELEGATION OF AUTHORITY: Management responsibility for the investment program.

DEPOSITORY INSTITUTION: A central repository through which members electronically transfer stock and bond certificates (a clearinghouse facility).

FDIC: Federal Deposit Insurance Corporation. A federal agency that insures bank deposits to a specified amount.

FEDERAL RESERVE SYSTEM: The central bank of the United States created by Congress and consisting of a seven member Board of Governors in Washington, D.C., 12 regional banks and about 5,700 commercial banks that are members of the system.

INTEREST RATE: Interest per year divided by principal amount, expressed as a percentage.

INVESTMENT: The utilization of monies, not immediately needed to pay demands, by investing these surplus funds in accordance with the three objectives of safety first and foremost, followed by liquidity then yield.

INVESTMENT ADVISOR: A person or organization employed by an individual or mutual fund to manage assets or provide investment advice.

LAIF: Local Agency Investment Fund – The aggregate of all funds from political subdivisions that are placed in the custody of the State Treasurer for investment and reinvestment.

LETTERS OF CREDIT: A document issued by a bank which guarantees the payment of a customer's drafts for a specified period and up to a specified amount.

LIMITED LIABILITY COMPANY: LLC. A type of company whose owners and managers receive the limited liability and (usually) tax benefits of an S Corporation without having to conform to the S Corporation restrictions.

LIQUIDITY: A liquid asset is one that can be converted easily and rapidly into cash without a substantial loss of value. In the money market, a security is said to be liquid if the spread

Page 134 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 11 of 13 ends

between bid and asked prices is narrow and sales of reasonable size can be done at those quotes.

MARKET VALUE: The price at which a security is trading and could presumably be purchased or sold.

MARKETABLE SECURITIES: Securities that can be easily converted into cash. Such securities will generally have highly liquid markets allowing the security to be sold at a reasonable price very quickly.

MATURITY: The date upon which the principal or stated value of an investment becomes due and payable.

MOODY’S: One of the most prominent credit rating agencies in the U.S.

MUTUAL FUNDS: An open-ended fund operated by an investment company which raises money from shareholders and invests in a group of assets, in accordance with a stated set of objectives. Mutual funds raise money by selling shares of the fund to the public, much like any other type of company can sell stock in itself to the public. Mutual funds then take the money they receive from the sale of their shares (along with any money made from previous investments) and use it to purchase various investment vehicles, such as stocks, bonds and money market instruments. In return for the money they give to the fund when purchasing shares, shareholders receive an equity position in the fund and, in effect, in each of its underlying securities. For most mutual funds, shareholders are free to sell their shares at any time, although the price of a share in a mutual fund will fluctuate daily.

NEGOTIABLE CERTIFICATES OF DEPOSIT: A CD with a very large denomination, usually $1 million or more. These are usually bought by institutional investors who are interested in low-risk investments. Negotiable certificates of deposit are usually in bearer form, and have secondary markets that are highly liquid.

NRSRO: Nationally recognized statistical rating organization.

PAR VALUE: The nominal dollar amount assigned to a security by the issuer. For an equity security, par value is usually a very small amount that bears no relationship to its market price, except for preferred stock, in which case par value is used to calculate dividend payments. For a debt security, par value is the amount repaid to the investor when the bond matures (usually, corporate bonds have a par value of $1,000, municipal bonds $5,000, and federal bonds $10,000). In the secondary market, a bond's price fluctuates with interest rates. If interest rates are higher than the coupon rate on a bond, the bond will be sold below par value (at a "discount").

If interest rates have fallen, the bond will be sold above par value.

PASS THROUGH SECURITY: A security representing pooled debt obligations that passes income from debtors to its shareholders. The most common type is the mortgage-backed certificate.

Page 135 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 12 of 13 ends

PORTFOLIO: Collection of securities held by an investor.

PRIMARY DEALERS: A designation given by the Federal Reserve System to commercial banks or broker/dealers who meet specific criteria, including capital requirements and participation in Treasury auctions.

PROMISSORY NOTES: A document signed by a borrower promising to repay a loan under agreed-upon terms.

REPURCHASE AGREEMENTS: A holder of securities sells these securities to an investor with an agreement to repurchase them at a fixed price on a fixed date. The security “buyer” in effect lends the “seller” money for the period of the agreement and the terms of the agreement are structured to compensate him for this. Dealers use RP extensively to finance their positions.

RETURN ON INVESTMENT: ROI. A measure of a corporation's profitability, equal to a fiscal year's income divided by common stock and preferred stock equity plus long-term debt. ROI measures how effectively the firm uses its capital to generate profit; the higher the ROI, the better.

REVERSE REPURCHASE AGREEMENTS: A purchase of securities with an agreement to resell them at a higher price at a specific future date. This is a way to borrow money and allow the securities to be held as collateral. Reverse repurchases occur most often in government securities, and often also in other securities that are highly valued and thus considered a good source of collateral.

SEC: Securities and Exchange Commission – Agency created by Congress to protect investors in securities transactions by administering securities legislation.

SECURITIES: Investment instruments, other than insurance policies or fixed annuities, issued by a corporation, government, or other organization which offers evidence of debt or equity. The official definition, from the Securities Exchange Act of 1934, is: "Any note, stock, treasury stock, bond, debenture, certificate of interest or participation in any profit-sharing agreement or in any oil, gas, or other mineral royalty or lease, any collateral trust certificate, pre-organization certificate or subscription, transferable share, investment contract, voting-trust certificate, certificate of deposit for a security, any put, call, straddle, option, or privilege on any security, certificate of deposit, or group or index of securities (including any interest therein or based on the value thereof), or any put, call, straddle, option, or privilege entered into on a national securities exchange relating to foreign currency, or in general, any instrument commonly known as a 'security'; or any certificate of interest or participation in, temporary or interim certificate for, receipt for, or warrant or right to subscribe to or purchase, any of the foregoing; but shall not include currency or any note, draft, bill of exchange, or banker's acceptance which has a maturity at the time of issuance of not exceeding nine months, exclusive of days of grace, or any renewal thereof the maturity of which is likewise limited." SEC: Securities and Exchange Commission – Agency created by Congress to protect investors in securities transactions by administering securities legislation.

Page 136 of 590 ends

COUNCIL/ADMINISTRATIVE POLICY
Subject:

INVESTMENT POLICY
Policy No: 10-4 Date: May 23, 2023
June 10, 2025
Resolution No.
2023-592025-XX

Page 13 of 13 ends

SPECIAL PURPOSE CORPORATION: A business interest formed solely in order to accomplish some specific task or tasks. A business may utilize a special purpose entity for accounting purposes, but these transactions must still adhere to certain regulations.

SUPRANATIONALS: International financial institutions that are generally established by agreements among nations, with member nations contributing capital and participating in management. Supranational bonds finance economic and infrastructure development and support environmental protection, poverty reduction, and renewable energy around the globe.

SURETY BOND: A bond issued by an entity on behalf of a second party, guaranteeing that the second party will fulfill an obligation or series of obligations to a third party. In the event that the obligations are not met, the third party will recover its losses via the bond.

TIME DEPOSITS: Savings account or CD held in a financial institution, usually a bank, for a fixed term or with the understanding that the customer can withdraw only by giving advanced notice.

TRANSACTIONS: An agreement between a buyer and a seller to exchange an asset for payment. In accounting, any event or condition recorded in the book of accounts.

TRUST: A legal arrangement in which an individual (the trustor) gives fiduciary control of property to a person or institution (the trustee) for the benefit of beneficiaries.

TRUSTEE: An individual or organization which holds or manages and invests assets for the benefit of another. The trustee is legally obliged to make all trust-related decisions with the beneficiary’s trustee's interests in mind, and may be liable for damages in the event of not doing so. Trustees may be entitled to a payment for their services, if specified in the trust deed.

In the specific case of the bond market, a trustee administers a bond issue for a borrower, and ensures that the issuer meets all the terms and conditions associated with the borrowing.

UNIFORM COMMERCIAL CODE: UCC. Set of laws regulating commercial transactions, especially ones involving the sale of goods and secured transactions.

U.S. TREASURY: The department of the U.S. government that issues Treasury securities.

YIELD: The rate of annual income return on an investment, expressed as a percentage. (a) INCOME YIELD is obtained by dividing the current dollar income by the current market price for the security. (b) NET YIELD or YIELD TO MATURITY is the current income yield minus any premium above par or plus any discount from par in purchase price, with the adjustment spread over the period from the date of purchase to the date of maturity of the bond.

Page 137 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.7
06/10/2025
SUBJECT: Adopt a Resolution Adopting the 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex
DEPARTMENT: Police Department
STAFF: Timothy Herbert, Chief of Police
Michael Thompson, Police Lieutenant

TITLE/RECOMMENDATION
Adopt the proposed resolution adopting the 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex.

FISCAL IMPACT
There is no fiscal impact to adopt the City of Brentwood’s Annex of the 2024 Contra Costa County Local Hazard Mitigation Plan.

BACKGROUND
In 2024, staff worked with Contra Costa County and other local jurisdictions to update the 2018 Contra Costa County Local Hazard Mitigation Plan (LHMP) in accordance with 44 CFR 201.6 (a)(4), which allows for local governments to work together to create a multi-jurisdictional plan, which serves as a guide for the county to become more resilient to the impacts of natural, human-caused, and technological hazard.

Local hazard mitigation plans form the foundation of a community's long-term strategy to reduce disaster losses and break the cycle of disaster damage, reconstruction, and repetitive damage. The Federal Emergency Management Agency (FEMA) supports local mitigation planning to achieve the fostering of partnerships amongst all levels of government, develop and strengthen non-government and private partnerships, promote more disaster-resilient communities, and reduce the costs associated with disaster response and recovery by promoting mitigation activities.

FEMA makes funding available for planning through the Hazard Mitigation Assistance (HMA) grant programs, including but not limited to: the Hazard Mitigation Grant Program (HMGP); HMGP-Post Fire; the Building Resilient Infrastructure and

Page 138 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.7
06/10/2025
Communities (BRIC) Program; the Flood Mitigation Assistance (FMA) Program; and Safeguarding Tomorrow Revolving Loan Fund. Approved mitigation plans are a requirement for local governments, including special districts, to be eligible for the projects funded under the HMA and other FEMA programs, including the Rehabilitation of High Hazard Potential Dams (HHPD). Additionally, Public Assistance funding is available to implement mitigation measures for damaged eligible facilities to protect against future damages, so long as the recipient has an approved state mitigation plan. Mitigation plans must be reviewed and updated every five years and formally adopted by each participating jurisdiction’s governing body as part of receiving approval. Although an approved local mitigation plan is one of the conditions for applying for and receiving FEMA mitigation grants, having an approved mitigation plan does not mean that mitigation grant funding will be awarded.

The County Base Plan was approved by FEMA and the California Office of Emergency Services (CalOES) on September 23, 2024. As noted by the County:

Given the number of participants, the plan is divided into two volumes.

Volume I is the county plan; it includes the overall analysis of the hazards, a county profile, the countywide mitigation action items, and sets the foundation for participating jurisdiction annexes. Volume II is comprised of the annexes for each participating city and special district.

City of Brentwood stakeholders and the public were given a number of opportunities to be involved throughout the planning process for Brentwood’s portion of Volume II.

Opportunities were provided via a public survey, in-person and virtual public meetings, and public engagement activities to review the Plan draft (i.e., public comment period). The public meetings allowed the County to introduce the Plan update, identify additional hazards of concern that should be included, if any, and to provide input for the various mitigation measures intended to eliminate or reduce the negative impact to those hazards. Language translation assistance in Spanish was available in all public meetings. The public survey asked community representatives and members of the public to rate each of the hazards in terms of perceived risk.

Furthermore, they were asked to rate “mitigation importance” for each of the identified hazards in the Plan. The information gathered from this survey was used to inform the hazard risk prioritization process, and to ensure the Plan adequately addressed the public’s concerns and priorities. The survey was available in English, Spanish, Tagalog, Traditional Chinese, and Simplified Chinese. A total of 60 respondents that lived in the City and 22 that worked in the City participated in the survey.

Page 139 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.7
06/10/2025
The attached City of Brentwood Annex provides details and supporting documentation of the City’s extensive public outreach efforts to invite the review of and feedback on the City of Brentwood Annex.

Post-adoption, the LHMP requires annual progress tracking with the steering committee and plan participants, which might result in changes. Furthermore, changes in staff and local leadership may also change the mitigation strategy and priorities. Every five years, the mitigation plan needs to be reviewed and updated due to changes in population, demographics, infrastructure, and hazards.

The attached City of Brentwood Annex identifies mitigation goals and actions to reduce or eliminate long-term risk to people and property in the City of Brentwood from the impacts of future hazards and disasters. Adopting this plan demonstrates commitment to the hazard mitigation goals and actions outlined in the Annex.

CITY COUNCIL STRATEGIC INITIATIVE
Not Applicable.

PREVIOUS ACTION
Previous Action by the City Council is included on Attachment 1.

DATE OF NOTICE
Not Applicable.

ENVIRONMENTAL DETERMINATION
Not Applicable.

ALTERNATIVE OPTION(S)
The City Council may opt not to adopt the City of Brentwood Annex to the 2024 Contra Costa County Local Hazard Mitigation Plan. However, each jurisdiction, including special districts, that participated in the planning process and is seeking FEMA approval, must adopt the mitigation plan. A participating jurisdiction that does not adopt the plan will not be considered to have an approved plan and will not be eligible for certain kinds of non-emergency disaster assistance from FEMA.

Page 140 of 590 ends

CITY COUNCIL AGENDA ITEM NO. F.7
06/10/2025

ATTACHMENT(S)

1. Previous Action

2. Resolution

3. Previous Action Resolution 2019-31

4. 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex

5. Contra Costa Co Amendment 37 Annexes

Page 141 of 590 ends

RESOLUTION NO. 2025-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BRENTWOOD ADOPTING THE 2024 CONTRA COSTA COUNTY
LOCAL HAZARD MITIGATION PLAN – CITY OF BRENTWOOD
ANNEX.

WHEREAS, on August 26, 2008, the City Council adopted Resolution No. 2008-206, authorizing the City Manager to sign a letter of intent to participate in the Contra Costa County Hazard Mitigation Planning Partnership; and WHEREAS, local hazard mitigation plans form the foundation of a community's long-term strategy to reduce disaster losses and break the cycle of disaster damage, reconstruction and repetitive damage; and
WHEREAS, in 2024, City staff worked with Contra Costa County and other local jurisdictions to update the 2018 Contra Costa County Local Hazard Mitigation Plan (LHMP) in accordance with 44 CFR Section 201.6(a)(4) which allows for local governments to work together to create a multi-jurisdictional plan; and WHEREAS, the Contra Costa County Base Plan was approved by the Federal Emergency Management Agency (FEMA) and the California Office of Emergency Services (CalOES) on September 23, 2024; and
WHEREAS, the City of Brentwood Annex identifies mitigation goals and actions to reduce or eliminate long-term risk to people and property in the City of Brentwood from the impacts of future hazards and disasters; and WHEREAS, the LHMP requires annual progress tracking with the steering committee and plan participants; and
WHEREAS, adoption of the 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex by the City of Brentwood City Council demonstrates the City’s commitment to the hazard mitigation goals and actions outlined in the Annex.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood does hereby adopt the 2024 Contra Costa County Local Hazard Mitigation Plan – City of Brentwood Annex, and content related to Brentwood may require revisions to meet the plan approval requirements, changes occurring after adoption will not require the City of Brentwood to re-adopt any further iterations of the plan.

Subsequent plan updates following the approval period for this plan will require separate adoption resolutions.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 10th day of June 2025 by the following vote:

Page 142 of 590 ends

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On August 26, 2008, the City Council adopted Resolution No. 2008-206 authorizing the City Manager to sign a letter of intent to participate in the Contra Costa County Hazard Mitigation Planning Partnership.

On March 26, 2019, the City Council adopted Resolution No. 2019-31 authorizing the City Manager or their designee to adopt all of volume 1 and the City of Brentwood portion of volume 2 of the Contra Costa County Operational Area Hazard Mitigation Plan Update.

Page 143 of 590 ends
Page 144 of 590 ends
Page 145 of 590 ends

City of
Brentwood
Annex
2024 Hazard
Mitigation
Plan
Contra Costa County,
California

Page 146 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
Table of Contents i

TABLE OF CONTENTS

1. Introduction............................................................................................................................... 1

2. Local Planning Team ................................................................................................................ 1

3. Jurisdiction Profile.................................................................................................................... 1

3.1. Population .......................................................................................................................... 1

3.1.1. Underserved Population ............................................................................................. 2

3.2. Brief History........................................................................................................................ 3

3.3. Governing Body Format...................................................................................................... 3

4. Development Trends................................................................................................................. 3

4.1. Changes in Priority ............................................................................................................. 4

5. Capability Assessment............................................................................................................. 4

5.1. Planning and Regulatory Capabilities ................................................................................. 5

5.2. Administrative and Technical Capabilities........................................................................... 9

5.3. Financial Resources ......................................................................................................... 11

5.4. Education and Outreach Capabilities................................................................................ 12

6. Hazard Mitigation Plan Integration......................................................................................... 14

6.1. Past Plan Integration ........................................................................................................ 14

6.2. Potential Future Integration .............................................................................................. 14

7. Significant Hazard Past Events.............................................................................................. 15

8. National Flood Insurance Program........................................................................................ 16

8.1. Floodplain Manager.......................................................................................................... 16

8.2. Participation Activities....................................................................................................... 16

8.2.1. Substantial Damage.................................................................................................. 16

8.2.2. Substantial Improvement .......................................................................................... 16

8.3. Repetitive Loss and Severe Repetitive Loss Properties.................................................... 17

9. Hazard Vulnerability and Impact Assessment ...................................................................... 17

9.1. FEMA National Risk Index................................................................................................ 26

9.1.1. Expected Annual Loss .............................................................................................. 27

9.1.2. Social Vulnerability ................................................................................................... 28

9.1.3. Community Resilience .............................................................................................. 28

9.1.4. Annualized Frequency .............................................................................................. 29

10. Hazard Risk Ranking.......................................................................................................... 29

11. Mitigation Actions .............................................................................................................. 32 Appendix A. Hazard Maps........................................................................................................ 46 Appendix B. Stakeholder and Public Engagement ................................................................ 50 Appendix C. Hazard Risk Assessment Methodology............................................................. 74

Page 147 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex ii
Appendix D. Hazard Risk Ranking Details.............................................................................. 82 Appendix E. Plan Adoption.................................................................................................... 102

Page 148 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 1

1. INTRODUCTION
This Annex details the hazard mitigation elements specific to the City of Brentwood, a participating jurisdiction to the 2024 Contra Costa County Hazard Mitigation Plan update. This Annex is not intended to be a standalone document but supplements the information contained in Volume 1 (Planning Areawide Elements). Therefore, all sections of Volume 1 (Planning Area-wide Elements) including the planning process, mitigation goals and objectives, hazard identification and risk assessment, mitigation strategy, and plan maintenance apply to and were met by the City of Brentwood. This Annex provides additional information specific to the City, with a focus on providing additional details on the hazard risk assessment and mitigation strategy (i.e., mitigation actions) for this community.

2. LOCAL PLANNING TEAM
The City of Brentwood Local Planning Team was comprised of the members listed on Table 1.

Table 1. City of Brentwood Local Planning Team Members
Name Title Department
Michael Thompson Lieutenant City of Brentwood Police
Department
Kenneth Murphy Chief Building Official City of Brentwood Community Development
Doug Pittman Emergency Services Program
Manager
City of Brentwood Police
Department (Consultant)

3. JURISDICTION PROFILE
The City of Brentwood, incorporated in 1948, is in the eastern portion of Contra Costa County, seven (7) miles southeast of the City of Antioch (center to center) and 32 miles east of the City of Oakland. It is situated along the San Joaquin Delta in the East Bay region of the San Francisco Bay Area. The major thoroughfare is State Route 4, which traverses Contra Costa County from east to west and provides access to San Joaquin County. The City of Brentwood has a total area of 11.67 square miles, of which

0.01 square miles is water. The landscape is marked by rolling hills, native grasses, oak trees, and fruit orchards, with two (2) public golf courses.

3.1. Population
The City of Brentwood had a population of 66,127 as of July 1, 2022. Between 2010 and 2020, the population increased by approximately 24.9% with an additional increase of 2.9% between 2020 and 2022. Table 2 shows the City of Brentwood’s population distribution between 2010 and 2022.1 Table 2. Population Estimates
Jurisdiction 2010 2020 2022 Population Change
(2010 – 2022)
City of Brentwood 51,481 64,292 66,127 28.4%
1 United States Census Bureau. (2022). Quick Facts: City of Brentwood. Retrieved from https://www.census.gov/quickfacts/fact/table/brentwoodcitycalifornia/.

Page 149 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 2

3.1.1. Underserved Population
The 2023 California State Hazard Mitigation Plan identifies the Centers for Disease Control and Prevention (CDC) Social Vulnerability Index (SVI) as the most appropriate and authoritative dataset to identify areas where efforts can be prioritized to ensure equitable outcomes from mitigation planning and actions.

CDC’s SVI combines 16 social factors, within four (4) themes (i.e., socioeconomic status, household characteristics, racial and ethnic minority status, and housing type and transportation), to identify areas of social vulnerability. Table 3 outlines the SVI information for the City of Brentwood.

Note: ArcGIS mapping analysis was performed utilizing Census Tract data by overlaying Census Tracts with the City of Brentwood planning area boundary. The information outlined in this section includes data from the Census Tracts that intersect the jurisdiction.

Table 3. Social Vulnerability Index (2020)
Theme Social Factors Population Percent
Socioeconomic
Status
People below 150% poverty estimate 9,343 14.5%
Unemployed
(Civilian 16 years old and older) 2,492 3.9%
Housing Cost Burden 5,603 8.7%
No High School Diploma 3,675 5.7%
No Health Insurance 1,897 3.0%
Household
Characteristics
65 years old and older 11,711 18.2%
17 years and younger 21,157 32.9%
Civilian with a Disability 10,307 16.0%
Single-Parent Household 1,350 2.1%
English Language Proficiency 2,335 3.6%
Racial and Ethnic
Minority Status
• Hispanic or Latino (of any race)
• Black or African American
• Asian
• American Indian or Alaska Native
• Native Hawaiian or Pacific Islander
• Two or More Races
• Other Races
42,305 65.8%
Housing Type and
Transportation
Multi-Unit Structures 1,252 1.9%
Mobile Homes 272 0.4%
Crowding 726 1.1%
No Vehicle 781 1.2%
Group Quarters 303 0.5%

Page 150 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 3

3.2. Brief History
Brentwood began as a farming community in the late 1800s and it is known throughout the Bay Area for its agricultural products, primarily its cherries, corn, and peaches. Brentwood was originally laid out on land donated from property owned by John Marsh, an East Contra Costa County pioneer. The City is named after Marsh’s ancestral home, the town of Brentwood in the County of Essex, England. Many of the old farms have been replaced by suburban developments since 1990. Despite the decrease in farmland, the City of Brentwood remains a popular location for Bay area residents to visit to pick their own fruits and berries.

3.3. Governing Body Format
The City of Brentwood has a Mayor-Council system of governance. Primary power lies with the five (5) council members. The Mayor presides over Council meetings and has the power to appoint and ceremonial duties. Official city business is administered by the Office of the City Manager. The City Council assumes responsibility for the adoption of this Plan, and the Police Department oversees its implementation.

4. DEVELOPMENT TRENDS
California Law requires counties and cities to prepare and adopt a General Pan, a comprehensive longrange plan to guide community development. The General Plan must contain seven (7) state-mandated elements – land use, housing, circulation, safety, open space, conservation, and noise – and may contain additional elements as a jurisdiction sees fit. Additionally, the General Plan must comprise an integrated and internally consistent set of goals, policies, and implementation measures. The City of Brentwood adopted its General Plan under this law and has updated it several times over the years, including most recently in July 2014.

Brentwood was a typical small, bedroom/farming community until the mid-1990s, when the City experienced tremendous growth through the mid-2000s. During this time, the population of the City had more than tripled. For the first few years after that expansionary period, the City saw significantly reduced growth, including a decline in property valuations. Over the last several years, growth has been back to a moderate level and property valuations have increased.

Although the City continues to emphasize growth in the commercial, industrial, and retail sectors, office and industrial development also slowed as a result of the recession. While this has returned to a degree, it is expected that the pace of new permits for office, industrial, and retail construction will continue to be fairly sluggish during the next several years as market absorption of existing and vacant space will need to take place before significant amounts of new construction is feasible.

Table 4 summarizes development trends in the performance period since development of the previous hazard mitigation plan and expected future development trends.

Page 151 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 4
Table 4. Recent and Expected Development Trends
Criteria Response
Has your jurisdiction annexed any
land since the development of the
previous Hazard Mitigation Plan?
No
If yes, give the estimated area
annexed and estimated number of
parcels or structures.

N/A
Is your jurisdiction expected to annex
any areas during the performance
period of this Plan?
No
Has your jurisdiction had any major
changes in development over the
past five (5) years that have occurred
in hazard prone areas?
No
If yes, please briefly describe. N/A
Are any areas targeted for
development or major redevelopment
in the next five (5) years that will
occur in hazard prone areas?
Yes
If yes, please briefly describe.

The PA-1 Specific Plan area, located in the northwest corner of the City, is targeted for significant jobs development in the next few years, including a possible transit village with the extension of BART.

Please provide the number of permits
for each hazard area or provide a
qualitative description of where
development has occurred.

The City of Brentwood does not have a database tracking the number of development permits issued in specific hazard areas. At the time an applicant proposes development in a specific location, if applicable, staff assesses hazard risk specific to individual projects.

For example, areas with steep slopes/potential landslide hazards require a hillside development permit and soils/geotechnical report.

4.1. Changes in Priority
The overall hazard mitigation priorities have not significantly changed for the City of Brentwood since the last Plan update. However, mitigation actions from the previous Plan were updated, and a more concerted effort on achieving equitable outcomes for all communities, including underserved communities and socially vulnerable populations, has been implemented.

5. CAPABILITY ASSESSMENT
Federal regulations require hazard mitigation plans to identify goals for reducing long-term vulnerabilities to the identified hazards in the planning area (Section 201.6(c)(3)(i)). A critical step in the development of specific hazard mitigation actions and projects is assessing existing authorities, policies, programs, and resources and capabilities to use or modify local tools to reduce losses and vulnerability from profiled hazards.

A capability assessment was conducted for the City of Brentwood and participating jurisdictions’ authorities, policies, programs, and resources. Goals and mitigation actions were developed using input from this assessment. Information regarding the City’s implementation of and continued participation in the National Flood Insurance Program (NFIP) can be found in Section 8 of this Annex.

Page 152 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 5
The Local Planning Team assessed the City’s capabilities that can contribute to the reduction of longterm vulnerabilities to hazards. The capabilities include the following categories:
• Planning and Regulatory Capabilities
• Administrative and Technical Capabilities
• Financial Capabilities
• Education and Outreach Capabilities
Additionally, ways to expand on and improve these existing policies and programs to integrate hazard mitigation into the day-to-day activities and programs of the City were considered.

5.1. Planning and Regulatory Capabilities
These include local ordinances, policies, and laws to manage growth and development (e.g., land use plans, capital improvement plans, transportation plans, emergency preparedness and response plans, building codes, and zoning ordinances). The City of Brentwood will adopt the approved 2024 Contra Costa County Hazard Mitigation Plan into the City’s General Plan Safety Element for AB 2140 compliance. Table 5 contains a list of legal and regulatory capabilities. The description section of each Planning and Regulatory Capability includes a paragraph on expansion, implementation, and improvement.

Table 5. Planning and Regulatory Capabilities
City Code, Title 15: Building and Construction
Includes: Building Code, Electrical Code, Plumbing Code, Mechanical Code, Housing Code, House Moving, Grading, Community Preservation, Fire Code, Floodplain Management City Building Regulations (incorporates by reference and is based upon the 2022 California Building Code, 2022 California Residential Code, 2022 California Green Building Standards Code, and 2022 California Existing Building Code [all codified in California Code of Regulations, Title 24]); adopted November 17, 2022.

Title 15 also addresses floodplain management including participation in NFIP as the basis for establishing the special flood hazard areas (SFHA). It also designates and lists the duties and responsibilities of the Floodplain Manager.

Expansion, Implementation, and Improvement: The Building and Fire codes will be reviewed based on developing trends in identified hazards and mitigation measures that can make them more effective at preventing losses. They will be updated to comply with the latest International and State building codes.

As FEMA develops new guidance for the NFIP, it will be incorporated into the City Code, as appropriate, and integrated as updates to this Hazard Mitigation Plan.

Lead
Department
City of Brentwood Community
Development Department
Hazards
Addressed
Climate Change, Dam and Levee
Failure, Drought, Earthquake,
Flood, Severe Weather, Wildfire

Page 153 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 6
City Code, Title 16: Subdivisions and Land Development
The City Subdivision Code addresses the development of groups of residences and commercial property. It describes requirements for transportation, water, and wastewater services. It sets limits on residential property density. The Planning Commission is designated as the Advisory Agency with respect to subdivisions.

Expansion, Implementation, and Improvement: Subdivision Code should be modified and updated to support changes in land use development. It should be implemented to require adequate infrastructure to support residential area populations.

Lead
Department
City of Brentwood Community
Development Department
Hazards
Addressed
Climate Change, Dam and Levee
Failure, Drought, Earthquake,
Flood, Severe Weather, Tsunami,
Wildfire, Sea Level Rise
City Code, Title 17: Zoning
The City Zoning Code addresses land use in precise detail. It sets standards for building and construction types and usage for all parcels in the City. It lists and describes building zones in the City.

Expansion, Implementation, and Improvement: The Zoning Code must be modified and updated to reflect changes in development. Zoning Code may be used to address land use regulations that support mitigation actions such as development in wetlands, floodplains, and preservation of open space.

Lead
Department
City of Brentwood Community
Development Department
Hazards
Addressed
Climate Change, Drought,
Earthquake, Flood, Severe
Weather, Tsunami, Wildfire, Sea
Level Rise
City General Plan
Includes the following Elements: Land Use, Growth Management, Circulation, Community Image and Design, Economic Development, Public Services and Facilities, Housing, Resource Management, Environment Hazards, Conservation
The purpose of the City General Plan is to express the broad goals and policies, and specific implementation measures, which will guide decisions on future growth, development, and the conservation of resources. The General Plan, adopted in July 2014, includes ten (10) elements:
• Circulation
• Community Services and Facilities
• Conservation and Open Space
• Economic Development
• Fiscal Sustainability
• Growth Management
• Infrastructure
• Land Use
• Noise
• Safety
Expansion, Implementation, and Improvement: This Hazard Mitigation Plan will be incorporated in the General Plan Safety Element, and it will be closely aligned. The General Plan will include specific actions that support mitigation throughout the City. The City is conducting a comprehensive update to its General Plan. The opportunity to incorporate additional hazard mitigation and abatement measures will be contemplated for inclusion into the updated General Plan.

Lead
Department
City of Brentwood Community
Development Department
Hazards
Addressed
Climate Change, Drought,
Earthquake, Flood, Severe
Weather, Tsunami, Wildfire, Sea
Level Rise

Page 154 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 7
Emergency Operations Plan
The City’s Emergency Operations Plan (EOP) describes what the local jurisdiction’s actions will be during a response to an emergency; includes annexes that describe in more detail the actions required of the local jurisdiction’s departments/ agencies. Additionally, the EOP describes the role of the Emergency Operation Center (EOC) and the coordination between the EOC and the local/tribal jurisdictions. Lastly, it describes how the EOC serves as the point of coordination between local, tribal, State, and Federal agencies during a disaster. This Hazard Mitigation Plan provides the basis for the hazards included and described in the EOP.

Expansion, Implementation, and Improvement: This Hazard Mitigation Plan will be used as an essential tool to update the City EOP. California Office of Emergency Services (Cal OES) requires that EOPs describe applicable hazards as part of the Plan. The latest Hazard Mitigation Plan hazards descriptions will be included.

Mitigation actions that are preparedness and response in nature will be analyzed for applicability for inclusion in the description of EOP processes and procedures.

Lead
Department
City of Brentwood Police
Department
Hazards
Addressed
Climate Change, Dam and Levee
Failure, Drought, Earthquake,
Flood, Landslide, Sea Level Rise,
Severe Weather, Tsunami,
Wildfire
Capital Improvement Plan
The Capital Improvement Plan (CIP) provides broad direction for development of City facilities and infrastructure. It describes a strategy to maintain adequate support for the City’s communities and commerce; and addresses transportation, greenhouse gases, stormwater, and other environmental factors.

Expansion, Implementation, and Improvement: The CIP should include mitigation measures that will be funded by the City such as improvements to stormwater collection systems, elevation of roadways at risk for flooding and strengthening of structures.

Lead
Department
City of Brentwood Public Works
Department and Engineering
Department
Hazards
Addressed
Climate Change, Dam and Levee
Failure, Drought, Earthquake,
Flood, Landslide, Sea Level Rise,
Severe Weather, Tsunami,
Wildfire
Stormwater Management Program
The Stormwater Management Program (SMP) is responsible for ensuring that the City complies with its municipal stormwater National Pollutant Discharge Elimination System (NPDES) permits. The NPDES program is mandated by the Federal Clean Water Act and administered in California by the State Water Resources Control Board and the Regional Water Quality Control Boards on behalf of the U.S. Environmental Protection Agency (EPA).

Expansion, Implementation, and Improvement: Mitigation actions in the Hazard Mitigation Plan can inform updates and revisions to the SMP. Watershed protection processes are a useful source of information for developing mitigation activities. This Hazard Mitigation Plan should be aligned with the Program.

Lead
Department
City of Brentwood Engineering
Department; City of Brentwood
Community Development
Department
Hazards
Addressed Flood
Continuity of Operations Plan
This Plan is under development.

Lead
Department City Manager’s Office Hazards Addressed
Climate Change, Dam and Levee
Failure, Drought, Earthquake,
Flood, Landslide, Sea Level Rise,
Severe Weather, Tsunami,
Wildfire

Page 155 of 590 ends

2024 Hazard Mitigation Plan
Contra Costa County, California
City of Brentwood Annex 8
County Climate Action Plan
The Contra Costa County Climate Action Plan (CAP), adopted in December 2015, is the County’s strategic approach to reduce greenhouse gas (GHG) emissions from sources throughout the unincorporated area. The CAP reflects the County’s programs and actions to decrease energy use, improve energy efficiency, develop renewable energy, reduce vehicle miles traveled, increase multi-modal travel options, expand green infrastructure, reduce waste, and improve the efficiency of government operations. The City is in the process of developing its own CAP.

Expansion, Implementation, and Improvement: The CAP will be updated in parallel with the General Plan.

While the General Plan will provide the long term resiliency framework of goals and policies, the CAP will provide strategic implementation programs to show how the County will reduce GHG emissions in support of the State’s adopted reduction targets for 2030 and 2050, reducing GHG emissions 40% below 1990 levels by 2030, with consideration of the State’s long term goal to reduce GHG emissions to 80% below 1990 levels by 2050.

Lead
Department
Contra Costa County Department
of Conservation and Development
Hazards
Addressed
Climate Change, Drought, Flood,
Severe Weather, Wildland Fire,
Sea Level Rise
Contra Costa Hazardous Materials Plan / Hazardous Material Business Plan Addresses the storage, use, and emergency planning for hazardous materials and extremely hazardous substances in the community and businesses.

Expansion, Implementation, and Improvement: This Hazard Mitigation Plan will support mitigation measures compatible with the County Hazardous Materials Plan to reduce potential hazardous materials releases.

Lead
Department
Contra Costa Health Services,
Hazardous Materials Program
Office; Contra Costa County Fire
Protection District
Hazards
Addressed Hazardous Materials Incidents
Alameda and Contra Costa County Regional Wildfire Prevention Plan The Contra Costa Resource Conservation District (CCRCD) and the Alameda City Resource Conservation District (ACRCD) worked jointly with funding from the Coastal Conservancy to develop a Regional Priority Plan (RPP) for Contra Costa and Alameda Counties. The goal of the RPP process was to identify regional natural resource concerns that could be exacerbated by catastrophic wildfire and develop projects or other methods to remedy those issues ahead of the next wildfire event. The planning process started in November 2020 and completed in September 2022.

Expansion, Implementation, and Improvement: This Hazard Mitigation Plan and Regional Wildfire Prevention Plan should be aligned where mitigation actions in this Hazard Mitigation Plan support the goals of the Regional Wildfire Prevention Plan. The wildfire analysis in this Hazard Mitigation Plan can inform updates and revisions to the Wildfire Prevention Plan.

Lead
Department
Contra Costa County Fire
Protection District
Hazards
Addressed Wildfire
Contra Costa County Community Wildfire Protection Plan
The Contra Costa County Wildfire Protection Plan (CWPP), updated in 2019, provides an analysis of wildfire hazards and risk in the wildland urban interface (WUI) in Contra Costa County. The Plan follows the standards for CWPPs established by the Federal Healthy Forest Restoration Act.

Expansion, Implementation, and Improvement: This Hazard Mitigation Plan and County Community Wildfire Protection Plan should be aligned where mitigation actions support the goals of the CWPP. The wildfire analysis in this Hazard Mitigation Plan can inform updates and revisions to the CWPP.

Lead
Department
Contra Costa County Fire
Protection District
Hazards
Addressed Wildfire

Page 156 of 590 ends
← All documents from this meeting