Cities Index.
Agenda packet, second session

Brentwood City Council
May 26, 2026

Document
Agenda packet, second session
Meeting
May 26, 2026
Body
Brentwood City Council
Pages
1,460
Original file
117.8 MB
Text extracted from the city's file for reading and search. Open the original on pub-brentwood.escribemeetings.com. That file is the official record.

Project Title: Project #:

Sunset Field Natural Turf Improvement 352-52432
Description/Justification:

This project will convert the natural turf at Sunset Park soccer fields A, B and C from the existing Fescue/Rye blended turf to a Hybrid Bermuda turf. The project will consist of removing all existing turf in the playing areas of fields A, B and C, leveling of the fields, adding and rototilling in soil amendments, prep work and irrigation adjustments followed by the installation of new Hybrid Bermuda sod. The current Fescue/Rye blended turf at soccer fields A, B and C is not withstanding the amount of player use and is resulting in deteriorated fields at a premature time. The Hybrid Bermuda turf is much stronger and can recover from high use much faster than the current turf.

Project Status:

The design and construction phase of this project is anticipated to begin in FY 2030/31.

Supplemental Information:

The goal for this project is to get soccer fields A, B and C at Sunset Park converted to a turf that is more practical for the high use it receives annually.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 3,000 $ 3,000
90040 Planning and Design 500 $ 500
90050 Construction 380,500 $ 380,500
TOTAL $ 384,000 $ 384,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47708 Replacement - Parks and LLAD 384,000 $ 384,000
TOTAL $ 384,000 $ 384,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Parks and Trails Improvements
Location: Sunset Road and Garin Parkway
Project Manager: B. Johnson
Project Priority: 2C – Necessary
Est. Completion Date: 2030/31
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: CSF 2-7
74 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 138 of 1460 ends

Project Title: *MULTI-YEAR* Project #:

Trail Pavement Management - 2026 352-52457

Description/Justification:

This project includes slurry seal, crack seal and asphalt repair in City parks, parking lots and all City maintained pedestrian/bicycle trails. There are twenty-one (21) parking lots and thirty-one (31) trail sites included in this project. These sites are evaluated on an annual basis to ensure they meet the City requirements. Damage is caused by vehicular traffic and soil movement. Some damage is also caused by surface roots from trees in close proximity to the trails. Hardscape renovation is needed to prevent injuries and further catastrophic failure. Identification and correction of non-ADA compliant trail entry points is needed as well.

For FY 2025/26, the work will include the front parking lot at Sunset Park.

Project Status:

The construction phase is estimated to be complete in Fall 2026.

Supplemental Information:

This has been determined to be an annual program due to the volume of parking lots and trails Citywide, with staff prioritizing based on annual inspections.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 500 $ 500
90040 Planning and Design 500 $ 500
90050 Construction 100,000 49,000 $ 149,000
TOTAL $ 101,000 $ 49,000 150,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 100,000 $ 100,000
47293 Measure J 50,000 $ 50,000
TOTAL 150,000 $ 150,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Parks and Trail Improvements
Location: Various City trails
Project Manager: C Lopes/E. McGurk
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: CSF 2-7
75 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 139 of 1460 ends

Project Title: *MULTI-YEAR* Project #:

Trail Pavement Management - 2027
Description/Justification:

This project includes slurry seal, crack seal and asphalt repair in City parks, parking lots and all City maintained pedestrian/bicycle trails. There are twenty-one (21) parking lots and thirty-one (31) trail sites included in this project. These sites are evaluated on an annual basis to ensure they meet the City requirements. Damage is caused by vehicular traffic and soil movement. Some damage is also caused by surface roots from trees in close proximity to the trails. Hardscape renovation is needed to prevent injuries and further catastrophic failure. Identification and correction of non-ADA compliant trail entry points is needed as well.

Project Status:

The design and construction phases will begin in FY 2026/27.

Supplemental Information:

This has been determined to be an annual program due to the volume of parking lots and trails Citywide, with staff prioritizing based on annual inspections.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 500 $ 500
90040 Planning and Design 500 $ 500
90050 Construction 100,000 49,000 $ 149,000
TOTAL 101,000 $ 49,000 $ $ 150,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 100,000 $ 100,000
47293 Measure J 50,000 $ 50,000
TOTAL $ 150,000 $ 150,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Parks and Trail Improvements
Location: Various City trails
Project Manager: C Lopes/E. McGurk
Project Priority: 2C - Necessary
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: CSF 2-7
76 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 140 of 1460 ends

Project Title: Project #:

Trail Pavement Management - Future
Description/Justification:

This project includes slurry seal, crack seal and asphalt repair in City parks, parking lots and all City maintained pedestrian/bicycle trails. There are twenty-one (21) parking lots and thirty-one (31) trail sites included in this project. These sites are evaluated on an annual basis to ensure they meet the City requirements. Damage is caused by vehicular traffic and soil movement. Some damage is also caused by surface roots from trees in close proximity to the trails. Hardscape renovation is needed to prevent injuries and further catastrophic failure. Identification and correction of non-ADA compliant trail entry points is needed as well.

Project Status:

The design and construction phases for this project will occur in future years.

Supplemental Information:

This has been determined to be an annual program due to the volume of parking lots and trails Citywide, with staff prioritizing based on annual inspections.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 500 500 500 500 $ 2,000
90040 Planning and Design 500 500 500 500 $ 2,000
90050 Construction 149,000 149,000 149,000 149,000 $ 596,000 TOTAL $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 600,000 PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 100,000 100,000 100,000 100,000 $ 400,000 47293 Measure J 50,000 50,000 50,000 50,000 $ 200,000
TOTAL $ 150,000 $ 150,000 $ 150,000 $ 150,000 $ 600,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Parks and Trail Improvements
Location: Various City trails
Project Manager: C Lopes/E. McGurk
Project Priority: 2C - Necessary
Est. Completion Date: 2030/31
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: CSF 2-7
77 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 141 of 1460 ends

Water
Improvements
78 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 142 of 1460 ends

Page Project # Project Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost 82 56419 Brentwood Manor Water and Wastewater Rehabilitation $ 230,521 $ 4,756,479 $ 1,500,000 -$ -$ $ 6,487,000 - $ 83 56420 Canal Replacement Cost Share - Segment 5 5,587,000 310,000 - - - - 5,897,000 84 56414 Downtown Alley Rehabilitation - Helen Myers Way and Park Way 2,380,000 3,770,000 - - - - 6,150,000 85 56408 On-Site Chlorine Generation System Upgrade - 2,000,000 - - - - 2,000,000 86 56415 Pump Station 2.4 Installation - 350,000 4,000,000 - - - 4,350,000 87 Sludge Collector Equipment Replacement - 279,000 1,702,000 - - - 1,981,000 88 56320 Underground Water System Corrosion Mitigation 119,216 350,000 - - - - 469,216 89 56422 Valve Actuator and Control System Upgrade 340,000 1,700,000 - - - - 2,040,000 90 56417 Water Line Improvement - Pearson Drive/Foothill Drive 50,000 920,000 - - - - 970,000 91 56423 Water Operations Storage Building 200,000 800,000 - - - - 1,000,000 92 56411 Zone 2 Reduced Water Pressure Zone 99,000 1,301,000 - - - - 1,400,000 TOTAL $ 9,005,737 $ 16,536,479 $ 7,202,000 $ - $ - $ 32,744,216 - $ Water Improvements
Expenditures by Project
Fiscal Years 2026/27 - 2030/31
79 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 143 of 1460 ends

Project Expenditures Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost Legal 10,000 50,000 - - - - $ 60,000
Planning and Design 1,119,382 1,357,118 - - - - $ 2,476,500 Construction 7,633,988 14,360,228 7,202,000 - - - $ 29,196,216 Project Administration 210,867 769,133 - - - - $ 980,000 Land/ROW/Acquisitions 31,500 - - - - - $ 31,500
TOTAL $ 9,005,737 $ 16,536,479 $ 7,202,000 $ - $ - $ 32,744,216 - $ Project Funding Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost General Fund - - - - - - $ -
Development Impact Fees 7,399,344 124,000 - - - - $ 7,523,344 Enterprise 20,138,872 3,380,000 1,702,000 - - - $ 25,220,872 Federal/State/Agency - - - - - - $ -
Development Contributions - - - - - - $ -
Replacement - - - - - - $ -
Other - - - - - - $ -
Unfunded - - - - - - $ -
TOTAL $ 27,538,216 $ 3,504,000 $ 1,702,000 $ - $ - $ 32,744,216 - $ Water Improvements Summary

PROJECT FINANCING
80 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 144 of 1460 ends

81 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 145 of 1460 ends

Project Title: Project #:

Brentwood Manor Water and Wastewater Rehabilitation 562-56419 Description/Justification:

This project includes the replacement of 3,200 linear feet (lf) of water, sewer and storm drain facilities to correct existing operations and maintenance constraints due to the age of the facilities. This project will allow the City to accommodate the anticipated development around the surrounding area and bring the aging facilities up to current standards.

Project Status:

Construction is anticipated to begin in FY 2026/27.

Supplemental Information:

Funding for this project will be split equally between the Water Replacement Fund ($3,243,500) and the Wastewater Replacement Fund ($3,243,500). There will be future O & M costs consisting of routine maintenance and minor repairs of the water, sanitary sewer and storm drain facilities.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 50,000 $ 50,000
90040 Planning and Design 230,521 469,479 $ 700,000
90050 Construction 3,537,000 1,500,000 $ 5,037,000
90070 Project Administration 700,000 $ 700,000
TOTAL 230,521 $ 4,756,479 $ 1,500,000 $ 6,487,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47-Var Enterprise 6,487,000 $ 6,487,000
TOTAL 6,487,000 $ 6,487,000 $

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: Brentwood Manor Subdivision - Curtis
Drive, Lynn Drive, Ellen Lane, Berry
Lane and Broderick Drive
Project Manager: M. Oliveira
Project Priority: 2C - Necessary
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $2,500
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 2-1, IF 3-1, IF 4-1
82 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 146 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Canal Replacement Cost Share - Segment 5 562-56420

Description/Justification:

The City currently utilizes the Contra Costa Water District (CCWD) conveyance facilities (Contra Costa Canal, pumps, underground pipes and screens) for the delivery of Delta water to the Brentwood Water Treatment Plant. Through an agreement with CCWD, the City will pay for its proportional share of upgrades to CCWD's facilities. This project accounts for the City’s proportional share of the projected costs for CCWD’s Canal Replacement Project (Segment 5A and 5B).

Project Status:

The construction phase of this project began in FY 2022/23, with an estimated completion in FY 2026/27.

Supplemental Information:

The City's proportional cost share for this project has been established at 14.5% of capacity, or 30 million gallons per day (MGD) and will be funded 40% by Water Development Impact Fees ($2,415,678) and 60% Water Replacement Funds ($3,481,322). The future annual O & M impact is unknown at this time.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90050 Construction 5,587,000 310,000 $ 5,897,000
TOTAL $ 5,587,000 $ 310,000 5,897,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47250 Development Impact Fees 2,291,678 124,000 $ 2,415,678 47563 Enterprise 3,295,322 186,000 $ 3,481,322
TOTAL 5,587,000 $ 310,000 $ 5,897,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Water Improvements
Location: Along Contra Costa Water District
Conveyance Facilities
Project Manager: A. Baquilar
Project Priority: 1B - Mandatory
Est. Completion Date: 2026/27
Future Annual
O & M Impact: TBD
Public Art
Requirement: Exempt
General Plan Policy: IF 2-1
83 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 147 of 1460 ends

Project Title: Project #:

Downtown Alley Rehabilitation - Helen Myers Way and Park Way 562-56414 Description/Justification:

This project will rehabilitate the Helen Myers Way (formerly Midway) and Park Way alleys in Downtown. This project consists of the installation of new water, sewer and storm drain facilities and either the removal or replacement of existing infrastructure to correct existing operations and maintenance constraints due to the age of the facilities. This project will allow the City to accommodate any future Downtown development and bring the aging facilities up to current standards.

Project Status:

This project is currently under construction, with an estimated completion in FY 2026/27.

Supplemental Information:

Funding for this project will be split equally between the Water Replacement Fund ($3,075,000) and the Wastewater Replacement Fund ($3,075,000). There will be future O & M costs consisting of routine water line and sewer line maintenance.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 180,000 $ 180,000
90050 Construction 2,000,000 3,770,000 $ 5,770,000
90070 Project Administration 200,000 $ 200,000
TOTAL $ 2,380,000 $ 3,770,000 $ 6,150,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47 - Var Enterprise 6,150,000 $ 6,150,000
TOTAL $ 6,150,000 $ 6,150,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: Helen Myers Way alley from Pine
Street to Birch Street and Park Way
alley from Birch Street to Chestnut
Street
Project Manager: M. Oliveira
Project Priority: 1A - Mandatory
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $1,500
Public Art
Requirement: Exempt
General Plan Policy: CIR 1-1, CIR 1-8, CIR 1-9, CIR 2-1, CIR 2-4, IF 1-1, IF 1-2, IF 2-1, IF 3-1, IF 3-2,
N 1-15
84 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 148 of 1460 ends

Project Title: Project #:

On-Site Chlorine Generation System Upgrade 562-56408

Description/Justification:

This project will upgrade and replace the on-site sodium hypochlorite generation systems at well sites throughout the City, which have been in place for more than 15 years. They have proven themselves unreliable, costly to maintain and have become maintenance intensive.

Project Status:

This project is in the planning phase and is anticipated to begin in FY 2026/27.

Supplemental Information:

Replacing the on-site sodium hypochlorite generation systems at well sites throughout the City will help to ensure a safe and reliable disinfection system for the City's groundwater supply. This project will systematically replace the on-site sodium hypochlorite generation systems to ensure wells are not out of service at the same time. Wells No. 6, 7, 8 and 15 will be completed in FY 2026/27. This project ensures the wells are in compliance with state and federal regulations.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90050 Construction 2,000,000 $ 2,000,000
TOTAL 2,000,000 $ 2,000,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47563 Enterprise 2,000,000 $ 2,000,000
TOTAL 2,000,000 $ 2,000,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Water Improvements
Location: Citywide
Project Manager: J. Wolfe
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 2-1
85 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 149 of 1460 ends

Project Title: Project #:

Pump Station 2.4 Installation 562-56415
Description/Justification:

The 2017 Water Master Plan identified this project as necessary to serve the future development of the Innovation Center @ Brentwood, formerly Priority Area -1 and Stonebrook development. This project will install a pump station adjacent to Reservoir

1.3 located on St. Regis Avenue. The new pump station should provide approximately 4,500 gallons per minute (GPM), which is approximately 6.5 millions of gallons per day (MGD), when fully operational. The pump station design will include four (4) 1,500- GPM pumps, a building to house electrical and instrumentation equipment, piping, fittings, flow meter, paved access road and fencing.

Project Status:

Design work will begin in FY 2026/27 with construction starting in FY 2027/28.

Supplemental Information:

Per the Water Master Plan dated June 1, 2017, the majority of system demands within Zone 2 are in the northern and central regions of this zone (the Innovation Center @ Brentwood and Bridle Gate projects) and hence, Pump Station 2.4 would meet this demand and improve efficiency. The funding for this project will come from Water Development Impact Fees ($4,350,000). There will be future O & M costs consisting of power consumption, routine maintenance of pumps and electrical and Supervisory Control and Data Acquisition (SCADA) maintenance.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 350,000 $ 350,000
90050 Construction 4,000,000 $ 4,000,000
TOTAL $ 350,000 $ 4,000,000 $ 4,350,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47250 Development Impact Fees 4,350,000 $ 4,350,000
TOTAL 4,350,000 $ $ 4,350,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: San Jose and St. Regis Avenues
Project Manager: A. Baquilar
Project Priority: 2C - Necessary
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $50,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 1-3, IF 2-1
86 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 150 of 1460 ends

Project Title: Project #:

Sludge Collector Equipment Replacement

Description/Justification:

This project will provide improvements to the City of Brentwood Water Treatment Plant (BWTP) chain and flight sedimentation basins including replacement of cross collector mechanisms, sprockets and floor wear strips. The sedimentation basins were installed in 2007 and have exceeded their service life. Recent condition assessments, including one in March 2023, determined that all submerged components require replacement.

Project Status:

This project will begin the design phase in FY 2026/27.

Supplemental Information:

Contra Costa Water District (CCWD) manages the implementation and construction of this project, which is funded through the Water Replacement Fund. Per the agreement with CCWD, the replacement and upgrade project costs and priorities are reviewed in conjunction with CCWD on an annual basis.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 279,000 $ 279,000
90050 Construction 1,702,000 $ 1,702,000
TOTAL 279,000 $ $ 1,702,000 1,981,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47563 Enterprise 279,000 1,702,000 $ 1,981,000
TOTAL 279,000 $ $ 1,702,000 1,981,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Water Improvements
Location: Citywide
Project Manager: J. Wolfe
Project Priority: 2C – Necessary
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 2-1
87 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 151 of 1460 ends

Project Title: Project #:

Underground Water System Corrosion Mitigation 562-56320 Description/Justification:

This project will install cathodic protection systems on metallic water lines and valves and fittings on fire hydrants, as required.

Cathodic protection is an efficient and cost effective method of protecting the buried metallic structure from either costly repairs or future replacement due to corrosive soils.

Project Status:

Construction of this project is anticipated to be completed in FY 2026/27.

Supplemental Information:

City staff completed analysis of the cathodic protection system for existing metallic water lines and the estimated construction costs were developed based on those findings. The project is funded by Water Development Impact Fees and the Water Enterprise Fund. This project will reduce and prevent the amount of emergency work on the water facilities due to ruptures caused by corrosion and minimize the amount of water lost each year due to leakage caused by corrosion, resulting in reduced future annual O & M costs.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 61,361 8,639 $ 70,000
90050 Construction 46,988 322,228 $ 369,216
90070 Project Administration 10,867 19,133 $ 30,000
TOTAL $ 119,216 $ 350,000 $ 469,216
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47250 Development Impact Fees 272,666 $ 272,666
47560 Enterprise 196,550 $ 196,550
TOTAL 469,216 $ $ 469,216

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: Citywide
Project Manager: A. Grewal
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $2,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 2-1, N 1-15
88 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 152 of 1460 ends

Project Title: Project #:

Valve Actuator and Control System Upgrade 562-56422
Description/Justification:

This project will provide improvements to the master station controls at the Brentwood Water Treatment Plant. The power supply boards for valve actuators at the flocculation/sedimentation basins, ozone contactors and filters have begun to fail, causing failures to other actuator electronics. The valve actuators are wired in series; consequently issues with one valve actuator affects communications for all valve actuators.

Project Status:

This project is in the design phase and construction is planned to begin in FY 2026/27.

Supplemental Information:

Contra Costa Water District (CCWD) manages the implementation and construction of this project, which is funded through the Water Replacement Fund. Per the agreement with CCWD, the replacement and upgrade project costs and priorities are reviewed in conjunction with CCWD on an annual basis.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 340,000 $ 340,000
90050 Construction 1,700,000 $ 1,700,000
TOTAL 340,000 $ 1,700,000 $ $ 2,040,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47563 Enterprise 340,000 1,700,000 $ 2,040,000
TOTAL 340,000 $ 1,700,000 $ $ 2,040,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: 3760 Neroly Road
Project Manager: J. Wolfe
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 2-1
89 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 153 of 1460 ends

Project Title: Project #:

Water Line Improvement - Pearson Drive/Foothill Drive 562-56417

Description/Justification:

The Water Master Plan identified this project as a high priority to improve distribution system operation and efficiency. This project will install approximately 700 lf of new 12” water line through the future extension of Foothill Drive from the Pearson Drive/Foothill Drive intersection to the John Muir Parkway extension, providing a critical connection between the east and west halves of the City’s Zone 2 water distribution network.

Project Status:

Staff is currently working on acquiring the necessary easement rights from a private property owner to construct, maintain and operate the waterline. This project is currently in the design phase and construction is anticipated to begin in FY 2026/27.

Supplemental Information:

This project is recommended per the Water Master Plan dated June 1, 2017. Funding for this project will be split equally between the Water Enterprise Fund ($485,000) and Water Development Impact Fees ($485,000). There will be future O & M costs consisting of routine water line maintenance, exercise valves, fire hydrants and maintaining the pressure in the pipe.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 10,000 $ 10,000
90040 Planning and Design 8,500 $ 8,500
90050 Construction 920,000 $ 920,000
90100 Land/ROW/Acquisitions 31,500 $ 31,500
TOTAL $ 50,000 $ 920,000 970,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47250 Development Impact Fees 485,000 $ 485,000
47560 Enterprise 485,000 $ 485,000
TOTAL $ 970,000 970,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Water Improvements
Location: From Pearson Drive/Foothill Drive
intersection to John Muir Parkway
extension
Project Manager: A. Grewal
Project Priority: 1C - Mandatory
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $1,500
Public Art
Requirement: Exempt
General Plan Policy: IF 2-1, N1-15
90 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 154 of 1460 ends

Project Title: Project #:

Water Operations Storage Building 562-56423
Description/Justification:

Construct a new 5,000 SF pre-fabricated metal shell storage building within the existing footprint of the Municipal Service Center (MSC) at 2201 Elkins Way. The new building will also include racks for storage of materials such as PVC pipe, valves, hydrants, air relief valves, etc. In addition, the construction of the building requires geotechnical, foundation, structural, drainage and surface improvements.

Project Status:

Design work is underway, with construction to begin in FY 2026/27.

Supplemental Information:

Currently, the materials are inadequately stored in portable sea-containers across the MSC. The ability to store materials and equipment in a single on-site location will allow staff to remove the portable containers and consolidate tools and materials in a centralized, easily accessible area. This project is funded by the Water Enterprise Fund ($1,000,000). The future O&M cost consists of maintenance of the building including, general repairs of the interior and exterior, electrical, utilities, security, and annual safety checks.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 200,000 $ 200,000
90050 Construction 750,000 $ 750,000
90070 Project Administration 50,000 $ 50,000
TOTAL $ 200,000 $ 800,000 $ 1,000,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47560 Enterprise 650,000 350,000 $ 1,000,000
TOTAL $ 650,000 $ 350,000 $ 1,000,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: 2201 Elkins Way
Project Manager: A. Baquilar & J. Wolfe
Project Priority: 1A - Mandatory
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $5,000
Public Art
Requirement: N/A
General Plan Policy: IF 1-1
91 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 155 of 1460 ends

Project Title: Project #:

Zone 2 Reduced Water Pressure Zone 562-56411
Description/Justification:

The Balfour Road and Summerset Drive pressure-reducing valve provides flow to provide service pressure to the Apple Hill and Summerset 1 neighborhoods during peak high-demand periods. This flow is largely made available by the pumping provided by Pump Stations 2.1 and 2.2, creating higher energy costs for the City. This project will isolate the valves within these neighborhoods from Zone 1 and make the area a “Zone 2 – Reduced” pressure zone. This new zone would be serviced exclusively by the Sand Creek and Balfour pressure reducing stations and as each reducing station has more than one valve and enough capacity for fire flow demands, these pressure reducing valves would only allow as much flow as is required by the residences in this area.

Project Status:

The preliminary design is underway, with the final design and construction phases anticipated in FY 2026/27.

Supplemental Information:

This project will be funded by the Water Enterprise Fund.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 99,000 250,000 $ 349,000
90050 Construction 1,051,000 $ 1,051,000
TOTAL 99,000 $ 1,301,000 $ $ 1,400,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47560 Enterprise 535,000 865,000 $ 1,400,000
TOTAL 535,000 $ 865,000 $ $ 1,400,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Water Improvements
Location: Apple Hill Estates and Summerset 1
Project Manager: A. Baquilar & J. Wolfe
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1
92 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 156 of 1460 ends

Wastewater
Improvements
93 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 157 of 1460 ends

Page Project # Project Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost 97 59208 Balfour Road – Sanitary Sewer Rehabilitation $ 1,000,000 - $ $ 850,000 $ - $ - $ 1,850,000 - $ 98 59209 Brentwood Boulevard – Sanitary Sewer Rehabilitation 2,025,000 2,025,000 - - - - 4,050,000 99 59202 Citywide Non-Potable Water Distribution System 8,901,902 99,908 406,018 - - - 9,407,828 101 59206 Collection System Improvements 50,000 450,000 - - - - 500,000 102 Highland Way Wastewater Upgrade - - 180,000 1,570,000 - - 1,750,000 103 59140 Wastewater Treatment Plant Expansion - Phase II 93,635,000 25,000,000 5,000,000 - - - 123,635,000 104 59210 Wastewater Treatment Plant Headworks Rehabilitation - 250,000 - 2,650,000 - - 2,900,000 105 Wastewater Treatment Plant Secondary Clarifier Replacement - - - 250,000 3,630,000 - 3,880,000 106 Wastewater Treatment Plant Tertiary Filter Expansion - - - - 4,200,000 - 4,200,000 107 59207 Water and Wastewater Laboratory 290,930 4,709,070 - - - - 5,000,000 TOTAL $ 104,902,832 $ 33,533,978 $ 6,436,018 $ 4,470,000 $ 7,830,000 $ 157,172,828 - $ Wastewater Improvements
Expenditures by Project
Fiscal Years 2026/27 - 2030/31
94 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 158 of 1460 ends

Project Expenditures Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost Legal - 142,270 - 60,000 - - $ 202,270
Planning and Design 9,871,476 1,124,908 180,000 250,000 300,000 - $ 11,726,384 Construction 83,799,185 32,334,070 6,231,018 3,880,000 7,330,000 - $ 133,574,273 Project Administration 10,787,501 75,000 25,000 280,000 200,000 - $ 11,367,501 Land/ROW/Acquisitions 302,400 - - - - - $ 302,400
TOTAL $ 104,902,832 $ 33,533,978 $ 6,436,018 $ 4,470,000 $ 7,830,000 $ 157,172,828 - $ Project Funding Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost General Fund - - - - - - $ -
Development Impact Fees 14,404,221 - 18,000 857,000 4,200,000 - $ 19,479,221 Enterprise 23,663,446 2,100,000 162,000 7,243,000 - - $ 33,168,446 Federal/State/Agency 74,156,036 - - - - - $ 74,156,036
Development Contributions - - - - - - $ -
Replacement 353,792 - - - - - $ 353,792
Other 15,333 30,000,000 - - - - $ 30,015,333
Unfunded - - - - - - $ -
TOTAL $ 112,592,828 $ 32,100,000 $ 180,000 $ 8,100,000 $ 4,200,000 $ 157,172,828 - $ Wastewater Improvements Summary

PROJECT FINANCING
95 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 159 of 1460 ends

96 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 160 of 1460 ends

Project Title: Project #:

Balfour Road – Sanitary Sewer Rehabilitation 592-59208

Description/Justification:

This project, formerly named “Balfour Road Wastewater Rehabilitation”, includes rehabilitating or replacing approximately 3,390 linear feet (lf) of an existing 18 inch and 24 inch Spirolite sanitary sewer main along Balfour Road between Fairview Avenue and Sweetgrass Drive. The sanitary sewer main has been observed to be deforming which is likely to cause infiltration of ground water into sanitary sewer systems.

Project Status:

Project design and construction is anticipated to begin in FY 2026/27, with project completion estimated in FY 2027/28.

Supplemental Information:

In accordance with the City’s Sanitary Sewer Management Plan (SSMP) to minimize sanitary sewer overflows and to prevent any State Water Resources Control Board violations, this section of sanitary sewer main needs to be replaced before a failure occurs.

Replacing this portion of pipeline will also minimize the amount of infiltration which has negative implications to the operation of the City’s Wastewater Treatment Plant.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 300,000 $ 300,000
90050 Construction 675,000 825,000 $ 1,500,000
90070 Project Administration 25,000 25,000 $ 50,000
TOTAL 1,000,000 $ 850,000 $ 1,850,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47593 Enterprise 1,850,000 $ 1,850,000
TOTAL 1,850,000 $ 1,850,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Wastewater Improvements
Location: Balfour Road from Fairview Avenue to
Sweetgrass Drive
Project Manager: M. Huber
Project Priority: 2C - Necessary
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $1,500
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1
97 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 161 of 1460 ends

Project Title: Project #:

Brentwood Boulevard – Sanitary Sewer Rehabilitation 592-59209

Description/Justification:

This project, formerly named “Brentwood Boulevard Wastewater Rehabilitation”, includes rehabilitating or replacing approximately 2,600 lf of an existing sanitary sewer main of varying sizes along Brentwood Boulevard between Oak Street and Havenwood Avenue. This line is comprised mostly of clay sewer pipe which was installed an estimated 68 years ago with no records of previous rehabilitation being performed. As clay pipe has an expected life span of 50 to 60 years, this section is due for replacement. Additionally, on this section of the line, there are approximately 22 sanitary sewer manholes in need of rehabilitation and 6 new manholes needing to be constructed/installed to allow for better maintenance access.

Project Status:

Project design is complete and the construction phase is anticipated to begin in Spring/Summer 2026, with project completion estimated in FY 2026/27.

Supplemental Information:

In accordance with the City’s SSMP to minimize sanitary sewer overflows and to prevent any State Water Resources Control Board violations, this section of sanitary sewer main needs rehabilitation or replacement before a failure occurs. This project will also reduce the amount of groundwater infiltration which has negative implications to the operation of the City’s Wastewater Treatment Plant.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 475,000 475,000 $ 950,000
90050 Construction 1,500,000 1,500,000 $ 3,000,000
90070 Project Administration 50,000 50,000 $ 100,000
TOTAL $ 2,025,000 $ 2,025,000 4,050,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47593 Enterprise 4,050,000 $ 4,050,000
TOTAL $ 4,050,000 4,050,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Wastewater Improvements
Location: Brentwood Boulevard from Oak Street
to Havenwood Avenue
Project Manager: M. Huber
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $1,500
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1
98 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 162 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Citywide Non-Potable Water Distribution System 592-59202 Description/Justification:

In FY 2021/22, the City constructed non-potable water mains along Fairview Avenue and Sand Creek Road, a Recycled Water Pump Station 2.1 (RWPS 2.1) and 14 meter conversions from potable to non-potable for irrigation. This project primarily consists of upgrades to RWPS 2.1 including the electrical switchgear, upsizing pumps and constructing an on-site storage tank.

Recent data collection shows that there continues to be a growing demand for non-potable water, requiring upgrades and improvements to the non-potable water distribution system. This includes RWPS 2.1, which must be improved to provide sufficient flow and capacity, as well as the existing pump that receives raw water from the East Contra Costa County Irrigation District canal adjacent to RWPS 2.1, for rare augmentation when needed. The City is working with a consultant to study current operations, collect additional data and provide a report with any further recommendations.

Project Status:

The remaining portion of this project is in the design phase, with design anticipated to be complete in FY 2026/27 and construction is anticipated to be complete in FY 2027/28.

Supplemental Information:

The Wastewater Treatment Plant (WWTP) discharges recycled water into Marsh Creek at the rate of nearly 4 million gallons per day (MGD) in the winter and roughly 1 MGD in the summer. Utilization and blending of this valuable resource is a major strategic component for compliance with the requirements of the WWTP National Pollutant Discharge Elimination System (NPDES) Permit.

This reduces the reliance and associated treatment costs on potable water and complies with both State and City mandates on increasing recycled water usage.

This project is funded by a State Water Resources Control Board Revolving Fund (SRF) loan, consisting of approximately 20% State and Federal grants and 80% loan, which will be repaid from the Wastewater Development Impact Fee and the Wastewater Enterprise Funds. A portion of this project has been funded by the State Proposition 1 Integrated Regional Water Management grant ($250,000), with matching funds from the City’s Parks and LLAD Replacement Funds ($353,792). There will be future annual O & M costs from routine water maintenance, such as line location, flushing, valve exercising, pump station, site security system, etc.

Project Category: Wastewater Improvements
Location: Sand Creek Road from Fairview
Avenue to Brentwood Boulevard,
Fairview Avenue from Grant Street to
Roddy Ranch Pump Station
Project Manager: M. Oliveira
Project Priority: 1A - Mandatory
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $1,500
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1
99 City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 163 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Citywide Non-Potable Water Distribution System (continued) 592-59202 PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 7,270 $ 7,270
90040 Planning and Design 1,055,546 99,908 $ 1,155,454
90050 Construction 7,299,185 406,018 $ 7,705,203
90070 Project Administration 237,501 $ 237,501
90100 Land/ROW/Acquisitions 302,400 $ 302,400
TOTAL $ 8,901,902 $ 99,908 $ 406,018 9,407,828 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47-Var Federal/State/Agency 9,054,036 $ 9,054,036
47708 Replacement - Parks & LLAD 353,792 $ 353,792
TOTAL $ 9,407,828 9,407,828 $

PROJECT FINANCING CURRENT PROPOSED
100
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 164 of 1460 ends

Project Title: Project #:

Collection System Improvements 592-59206
Description/Justification:

Wastewater collection system improvements have been identified in the City. Three sections of piping have been identified for repairs in order to ensure the sewage conveyance to the Wastewater Treatment Plant does not become interrupted. The structural degradation was observed while performing a Closed Caption Television (CCTV) inspection. This project will modify an existing vault to allow for easier maintenance access. This project will also install a 10” bypass pipeline to alleviate the issue of a sag in an existing 10” pipeline at Dainty Avenue and the railroad tracks. The project will replace 5 to 6 feet of cracked pipeline on Twin Bridge Court, 420 lf of pipeline along Castle Court and 35 lf of 8”pipeline on Valley Green Drive.

Project Status:

This project is in the initial planning and construction is anticipated to be completed in FY 2026/27.

Supplemental Information:

The project will be funded by the Wastewater Replacement Fund. City staff routinely repairs sections of the wastewater collection system piping. Periodically some repair jobs are deemed too large for City crews to complete efficiently. Several large necessary repairs have been identified: one at the Wastewater Treatment Plant, one on Twin Bridge Court, one on Dainty Avenue, one on Castle Court and one on Valley Green Drive.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 50,000 $ 50,000
90050 Construction 450,000 $ 450,000
TOTAL 50,000 $ 450,000 $ 500,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47593 Enterprise 400,000 100,000 $ 500,000
TOTAL 400,000 $ 100,000 $ 500,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Wastewater Improvements
Location: Citywide
Project Manager: M. Oliveira
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1, IF 3-2
101
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 165 of 1460 ends

Project Title: Project #:

Highland Way Wastewater Upgrade
Description/Justification:

The SSMP identified the existing 8” sewer main on Highland Way, from Sand Creek Road to Mill Creek Way, as deficient in the existing sewer system. This project will replace the existing 1,700 lf of 8” sewer main with a 10” sewer main to improve existing operational capacity and accommodate future planned development.

Project Status:

The design phase is anticipated to begin in FY 2027/28 and construction phase is anticipated to begin in FY 2028/29.

Supplemental Information:

Funding for this project comes from the Wastewater Development Impact Fee Fund ($175,000) and the Wastewater Replacement Fund ($1,575,000). There will be future O & M costs consisting of routine maintenance and minor repairs of the sanitary sewer facilities.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 10,000 $ 10,000
90040 Planning and Design 180,000 $ 180,000
90050 Construction 1,380,000 $ 1,380,000
90070 Project Administration 180,000 $ 180,000
TOTAL $ 180,000 $ 1,570,000 $ 1,750,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47255 Development Impact Fees 18,000 157,000 $ 175,000
47593 Enterprise 162,000 1,413,000 $ 1,575,000
TOTAL $ 180,000 $ 1,570,000 $ 1,750,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Wastewater Improvements
Location: Highland Way from Sand Creek Road
to Mill Creek Way
Project Manager: A. Baquilar
Project Priority: 2C - Necessary
Est. Completion Date: 2028/29
Future Annual
O & M Impact: $1,500
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1
102
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 166 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Wastewater Treatment Plant Expansion - Phase II 592-59140 Description/Justification:

The existing 5 MGD tertiary treatment facility was planned and constructed to accommodate future expansions. The Phase II Expansion is designed to treat 6.4 MGD, which will service the final buildout population per the current General Plan and accommodate planned and approved development of the City. The project includes the addition of one diffused aeration basin and one secondary clarifier, retrofit of existing oxidation ditches, modifications to the disinfection process, installation of a biosolids dryer and pyrolysis system and electrical distribution system upgrades. This project is necessary to keep the City in compliance with regulatory requirements.

Project Status:

The construction phase is ongoing and completion is anticipated in FY 2027/28.

Supplemental Information:

Funding is comprised of a deposit refund, Wastewater Development Impact Fees, Wastewater Enterprise Funds ($7,151,246), Wastewater Replacement Funds ($6,962,200) and an SRF loan of $61,246,000, which reflects principal forgiveness of $3,856,000 provided by a federal capitalization grant. The SRF loan is financed over a 30-year period with the debt service payment provided by the Wastewater Enterprise Fund and Wastewater Development Impact Fees. This project also includes a Biosolids Drying and Pyrolysis System. The Future Annual O & M Impact estimates the total operating and maintenance costs associated with this new facility, including personnel, supplies, utilities, building maintenance, administration, etc. The project was included in the City’s Strategic Plan for FY 2016/17 - FY 2017/18. Due to complications and delays brought on by the pandemic and subsequent supply chain issues, completion of this project will require additional funding which is anticipated to be provided by bond financing, to be repaid with future Wastewater Enterprise revenues.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 135,000 $ 135,000
90040 Planning and Design 8,000,000 $ 8,000,000
90050 Construction 75,000,000 25,000,000 5,000,000 $ 105,000,000 90070 Project Administration 10,500,000 $ 10,500,000
TOTAL $ 93,635,000 $ 25,000,000 $ 5,000,000 123,635,000 $ PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47255 Development Impact Fees 14,404,221 $ 14,404,221
47-Var Enterprise 14,113,446 $ 14,113,446
44475 Federal/State/Agency 65,102,000 $ 65,102,000
Other 15,333 30,000,000 $ 30,015,333
TOTAL $ 93,635,000 $ 30,000,000 123,635,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Wastewater Improvements
Location: Existing Wastewater Treatment Plant
site, east of Marsh Creek and north of
Sunset Road
Project Manager: C. Wichert
Project Priority: 1A - Mandatory
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $600,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 1-3, IF 3-1
103
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 167 of 1460 ends

Project Title: Project #:

Wastewater Treatment Plant Headworks Rehabilitation 592-59210 Description/Justification:

The headworks of the WWTP stands as pivotal infrastructure in the treatment process, with multiple sections requiring replacement, repair and expansion. The aging main influent pump Variable Frequency Drives (VFD) are 25 years old and are no longer supported by the manufacturer, making parts procurement and repairs progressively challenging. The barscreens are also approaching the end of their operational lifespan, prompting the necessity for replacement while adding a third bar screen to complete design buildout. Additionally, portions of the concrete structure are corroding, and warrant a comprehensive evaluation and spot repairs. A temporary bypass system would be needed to convey the influent to the facility during this rehabilitation.

Project Status:

This project is anticipated to begin construction in FY 2028/29.

Supplemental Information:

The Wastewater Treatment Plant currently has two influent barscreens that were installed in 2002 and rebuilt in FY 2012/13. The addition of a third barscreen is necessary to handle increased flows to the treatment process. Funding for this project comes from the Wastewater Replacement Fund and Wastewater Development Impact Fee Funds. Future annual O & M costs will be approximately $5,000 annually, consisting of electrical power to operate and preventative and corrective maintenance of the equipment.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 50,000 $ 50,000
90040 Planning and Design 250,000 $ 250,000
90050 Construction 2,500,000 $ 2,500,000
90070 Project Administration 100,000 $ 100,000
TOTAL $ 250,000 $ 2,650,000 $ 2,900,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47255 Development Impact Fees 700,000 $ 700,000
47593 Enterprise 250,000 1,950,000 $ 2,200,000
TOTAL $ 250,000 $ 2,650,000 $ 2,900,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Wastewater Improvements
Location: 2251 Elkins Way
Project Manager: C. Wichert
Project Priority: 2C - Necessary
Est. Completion Date: 2028/29
Future Annual
O & M Impact: $5,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1, IF 3-2
104
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 168 of 1460 ends

Project Title: Project #:

Wastewater Treatment Plant Secondary Clarifier Replacement

Description/Justification:

This project consists of replacing the metal infrastructure and drive units of two secondary clarifiers at the WWTP with stainless steel components that match the design and equipment of the new clarifier constructed as part of the WWTP Expansion.

Project Status:

This project is anticipated to begin design and construction in FY 2028/29.

Supplemental Information:

At the WWTP, a multitude of fixed and moving components operate within the treatment process while submerged. Routine inspections have revealed extensive corrosion in the metal components and drive units, indicating a need for replacement.

Replacing the submerged steel components with stainless steel will prevent future corrosion and extend the useful life of the equipment.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 250,000 $ 250,000
90050 Construction 3,530,000 $ 3,530,000
90070 Project Administration 100,000 $ 100,000
TOTAL 250,000 $ $ 3,630,000 3,880,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47593 Enterprise 3,880,000 $ 3,880,000
TOTAL 3,880,000 $ 3,880,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Wastewater Improvements
Location: 2251 Elkins Way
Project Manager: C. Wichert
Project Priority: 2C - Necessary
Est. Completion Date: 2029/30
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1, IF 3-2
105
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 169 of 1460 ends

Project Title: Project #:

Wastewater Treatment Plant Tertiary Filter Expansion
Description/Justification:

The California Code of Regulations (CCR) Title 22, as related to recycled water production, requires additional filters to satisfy State Water Resources Control Board’s Division of Drinking Water’s requirements to ensure adequate filtration of wastewater prior to disinfection. This project includes the completion of the tertiary filter complex build-out, installing up to four additional tertiary filters, increasing the treatment capacity to meet the current General Plan build-out population estimate.

Project Status:

This project is anticipated to begin design and construction in FY 2029/30.

Supplemental Information:

The WWTP was originally constructed in 2002. Certain components, such as the tertiary filters, were implemented in phases based on population growth, allowing capital investment to be deferred until the infrastructure was necessary. This project will provide the additional filtration treatment capacity necessary to comply with Title 22 Recycled Water regulations and accommodate the current General Plan build-out population estimate.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 300,000 $ 300,000
90050 Construction 3,800,000 $ 3,800,000
90070 Project Administration 100,000 $ 100,000
TOTAL $ 4,200,000 $ 4,200,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47255 Development Impact Fees 4,200,000 $ 4,200,000
TOTAL $ 4,200,000 $ 4,200,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Wastewater Improvements
Location: 2251 Elkins Way
Project Manager: C. Wichert
Project Priority: 2A - Necessary
Est. Completion Date: 2029/30
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 3-1, IF 3-2
106
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 170 of 1460 ends

Project Title: Project #:

Water and Wastewater Laboratory 592-59207
Description/Justification:

This project will provide a new, larger laboratory for the water and wastewater systems. The existing laboratory which was constructed in 2002, is outdated, already outgrown its footprint and the building is not readily expandable. Constructing a new, larger laboratory and converting the existing laboratory to office space will provide laboratory space adequate for build-out conditions, and has the added benefit of eliminating the need to build additional office space.

Project Status:

This final design is underway and anticipated to be complete in FY 2025/26, with construction expected to begin in FY 2026/27.

Supplemental Information:

Completion of this project will provide adequate space and equipment for staff to perform the necessary analysis to satisfy water and wastewater system regulatory requirements. Funding for this project will be 40% from the Water Enterprise Fund ($2M) and 60% from the Wastewater Enterprise Fund ($3M). The future annual O & M costs will be for general maintenance of the building/facility.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 290,930 $ 290,930
90050 Construction 4,709,070 $ 4,709,070
TOTAL 290,930 $ 4,709,070 $ 5,000,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47-Var Enterprise 3,000,000 2,000,000 $ 5,000,000
TOTAL 3,000,000 $ 2,000,000 $ 5,000,000 $

PROJECT FINANCING CURRENT PROPOSED
Project Category: Wastewater Improvements
Location: 2251 Elkins Way
Project Manager: M. Oliveira
Project Priority: 2C - Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $10,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1, IF 2-2
107
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 171 of 1460 ends

Community
Facilities
Improvements
108
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 172 of 1460 ends

Page Project # Project Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost 112 37260 Citywide Access Control System Upgrade $ 50,000 $ 231,300 $ 635,000 $ 559,300 $ - $ 1,475,600 - $ 113 37264 Comprehensive General Plan Update - 135,000 607,500 607,500 - - 1,350,000 114 Corporation Yard Security Improvements - 300,000 - - - - 300,000 115 37261 Downtown Public WiFi Upgrade 10,000 122,151 159,619 - - - 291,770 116 37265 Fleet Electrification 647,488 1,498,460 1,147,961 - - - 3,293,909 118 Housing Element Update – 7th Cycle - - - 6,000 334,500 334,500 675,000 119 Hydrodynamic Separator at Marsh Creek - 100,000 - - - - 100,000 120 37244 Public Art Spaces 467,956 318,427 - - - - 786,383 121 54022 Solid Waste Carts Upgrade 250,000 250,000 300,000 300,000 300,000 300,000 1,700,000 122 Solid Waste Transfer Station Updates - 400,000 1,700,000 - - - 2,100,000 123 Soundwall - Fairview Avenue and Balfour Road - - - - - 3,246,000 3,246,000 124 37231 Vineyards at Marsh Creek – Theater/Event Center/Amphitheater Phase I 603,493 633,934 8,962,573 - - - 10,200,000 125 Zoning Ordinance Comprehensive Update - - - - - 450,000 450,000 TOTAL $ 2,059,378 $ 3,958,831 $ 13,512,653 $ 1,472,800 $ 634,500 $ 4,330,500 $ 25,968,662 Community Facilities Improvements
Expenditures by Project
Fiscal Years 2026/27 - 2030/31
109
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 173 of 1460 ends

Project Expenditures Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost Legal 7,907 45,593 60,750 61,750 33,450 39,950 $ 249,400 Planning and Design 640,556 1,031,694 725,625 459,625 267,600 736,100 $ 3,861,200 Construction 1,338,488 2,634,494 12,507,580 859,300 300,000 3,511,000 $ 21,150,862 Project Administration 72,427 235,050 218,698 92,125 33,450 43,450 $ 695,200 Land/ROW/Acquisitions - 12,000 - - - - $ 12,000
TOTAL $ 2,059,378 $ 3,958,831 $ 13,512,653 $ 1,472,800 $ 634,500 $ 4,330,500 $ 25,968,662 Project Funding Prior 2026/27 2027/28 2028/29 2029/30 2030/31 Total Cost General Fund 199,901 1,510,990 - 675,000 - 450,000 $ 2,835,891 Development Impact Fees - - - - - - $ -
Enterprise 1,448,555 639,010 1,700,000 90,000 300,000 300,000 $ 4,477,565 Federal/State/Agency 1,876,200 522,253 - - - - $ 2,398,453 Development Contributions - - - - - - $ -
Replacement 1,636,451 - 21,619 109,300 - - $ 1,767,370
Other 10,186,383 1,057,000 - - - - $ 11,243,383
Unfunded - - - - - 3,246,000 $ 3,246,000
TOTAL $ 15,347,490 $ 3,729,253 $ 1,721,619 $ 874,300 $ 300,000 $ 3,996,000 $ 25,968,662 Community Facilities Improvements Summary

PROJECT FINANCING
110
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 174 of 1460 ends

111
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 175 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Citywide Access Control System Upgrade 337-37260
Description/Justification:

The City’s Access Control System (ACS) is responsible for securing City facilities and locations and controlling access through the use of City issued credentials such as FOBs or Access Cards. The original system was installed over ten (10) years ago and has received a number of updates and expansions over its life. Advancements in ACS technologies have improved the administration and maintenance of these systems and introduced security enhancements to better protect credentials. This project seeks to assess and reevaluate the City’s current ACS infrastructure and make changes and enhancements where necessary to improve physical security at all City facilities, including the Police Department, City Hall, Community Center, Brentwood Family Aquatic Complex (BFAC), Brentwood Senior Activity Center (BSAC), Municipal Service Center, Solid Waste Transfer Station and the Library.

These enhancements will also allow for better administration of personnel and credentials. Possible integration with the City’s surveillance system will be explored in an effort to streamline workflows and reduce response times for incidents or access requests.

Project Status:

This project is in the planning phase with construction anticipated to begin in FY 2026/27.

Supplemental Information:

The future annual O & M costs will be for annual licensing and maintenance plan.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 1,000 $ 1,000
90040 Planning and Design 50,000 35,000 20,000 $ 105,000 90050 Construction 180,000 600,000 559,300 $ 1,339,300
90070 Project Administration 15,300 15,000 $ 30,300
TOTAL $ 50,000 $ 231,300 $ 635,000 $ 559,300 $ 1,475,600 PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47703 Replacement - Information Systems 1,366,300 109,300 $ 1,475,600 TOTAL $ 1,366,300 $ 109,300 $ 1,475,600

PROJECT FINANCING CURRENT PROPOSED
Project Category: Community Facilities Improvements
Location: Citywide
Project Manager: M. Baria
Project Priority: 2C – Necessary
Est. Completion Date: 2028/29
Future Annual
O & M Impact: $5,000
Public Art
Requirement: Exempt
General Plan Policy: CSF 3-4
112
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 176 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Comprehensive General Plan Update 337-37264
Description/Justification:

This project involves a comprehensive update to the City’s General Plan, adopted July 22, 2014. This project will require a coordinated effort among all City departments, as well as extensive community engagement. Once updated, the General Plan will function as the community’s vision for future development. An Environmental Impact Report will be prepared to comply with the California Environmental Quality Act (CEQA).

Project Status:

The planning phase of this project is anticipated to begin in FY 2026/27, with the goal of substantial completion prior to the commencement of substantive work on the Housing Element of the General Plan in FY 2028/29.

Supplemental Information:

This project will be facilitated by the Community Development Department, with input from all City departments, and will include assistance from professional planning consultants and CEQA consultants. The City collects a General Plan Maintenance Fee of $415.00 per dwelling unit on residential building permits and $415.00 per 2,500 square feet on non-residential building permits.

The majority of the funding will be provided by General Plan Maintenance fees that have been collected on development projects of $852,500. The remainder of the cost of $497,500 will be funded by the General Fund; however, General Plan Maintenance fees collected in future years will recover the remaining cost. At the end of FY 2025/26, the General Fund is expected to have a $1,350,000 General Plan update reserve that will be used for this project.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 13,500 60,750 60,750 $ 135,000
90040 Planning and Design 101,250 455,625 455,625 $ 1,012,500 90070 Project Administration 20,250 91,125 91,125 $ 202,500 TOTAL 135,000 $ 607,500 $ 607,500 $ 1,350,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 1,350,000 $ 1,350,000
TOTAL 1,350,000 $ 1,350,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvements
Location: Citywide
Project Manager: A. Morris
Project Priority: 1E - Mandatory
Est. Completion Date: 2028/29
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: CIR 1-1, CIR 1-2, CIR-4, CSF 2-1, CSF 2-2, CSF 3-1, ED 1-2, ED 1-5, FI 1-1, FI
1-2, FI 1-3, IF 1-1, IF 2-1, IF 3-1, LU 1-
3, LU 1-4, LU 3-1, LU 4-1, LU 5-1, N 1-
1 113
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 177 of 1460 ends

Project Title: Project #:

Corporation Yard Security Improvements

Description/Justification:

Foot and vehicle traffic around the Corporation Yard have increased due to regional trail access, nearby residential development and the adjacent sports complex on Elkins Way. As a result, the Corporation Yard has experienced a rise in unauthorized access and vandalism. The proposed perimeter fencing, fob access and automated gate controlled access are intended to protect City assets, infrastructure and employees by restricting public access to the working areas of the Municipal Service Center (MSC), while maintaining public access for business.

Project Status:

Preliminary site layouts for fencing and gate improvements have been identified. Final design is expected to be completed by City staff, with construction anticipated in FY 2026/27.

Supplemental Information:

This project will decrease the City’s liability by limiting access to areas where vehicles and equipment regularly operate, while maintaining access to the administration building for business purposes. Funding for this project will come from the General Fund, Solid Waste Enterprise ($92,430), Water Enterprise ($72,450) and Wastewater Enterprise ($74,130) funds.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90050 Construction 300,000 $ 300,000
TOTAL 300,000 $ 300,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 60,990 $ 60,990
47-Var Enterprise 239,010 $ 239,010
TOTAL 300,000 $ 300,000 $

PROJECT FINANCING CURRENT PROPOSED
Project Category: Community Facilities Improvements
Location: 2201 Elkins Way
Project Manager: C. Ziemann
Project Priority: 2C – Necessary
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $5,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1
114
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 178 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Downtown Public WiFi Upgrade 337-37261

Description/Justification:

The City’s Downtown WiFi program provides free internet access to anyone visiting the downtown area. The system was implemented in FY 2012/13 and many of the hardware components have reached the end of their useful life. This project seeks to refresh the current system hardware as well as assess design/architecture in an effort to find ways to improve the overall speed, security and performance. Key features of the new system should include improved management software and tools allowing City staff to monitor activity and system health, adjusting service levels as needed.

Project Status:

This project is in the planning phase, with construction anticipated to begin in FY 2026/27.

Supplemental Information:

The future annual O & M costs will be for annual licensing and maintenance plan and additional internet services (if needed).

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 1,000 $ 1,000
90040 Planning and Design 10,000 $ 10,000
90050 Construction 117,151 159,619 $ 276,770
90070 Project Administration 4,000 $ 4,000
TOTAL 10,000 $ 122,151 $ 159,619 $ 291,770 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47703 Replacement - Information Systems 270,151 21,619 $ 291,770 TOTAL 270,151 $ 21,619 $ 291,770 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvements
Location: Downtown
Project Manager: M. Baria
Project Priority: 2C – Necessary
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $10,000
Public Art
Requirement: Exempt
General Plan Policy: CSF 2-7, ED 4-5, ED 4-6
115
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 179 of 1460 ends

Project Title: *MULTI-YEAR* Project #:

Fleet Electrification 337-37265

Description/Justification:

In September 2020, the State of California, by Executive Order N-79-20, set the goal that 100% of in-state sales of new passenger cars and trucks will be zero-emission by 2035, as well as medium and heavy-duty trucks by 2045 for all operations where feasible.

In November 2021, the State established a goal for public fleets to transition to 100% zero-emission vehicles (ZEVs) by 2030, where feasible. This requires public fleets to be converted to electric vehicles, making it necessary to design and install charging stations at City facilities. The City has roughly 100 vehicles that are candidates to transition to electric vehicles, and roughly 8 to 10 of these vehicles are replaced annually. Completion of the electrical infrastructure necessary to support this project at other City sites will be necessary in future years, and will allow for the charging of electric vehicles at the various locations they are used at. The key component of this project is the planning for the additional electrical power required to utilize the electric vehicle chargers.

Project Status:

This project is in the construction phase and is anticipated to be complete in FY 2027/28.

Supplemental Information:

Order N-79-20 requires 50% of fleet vehicles purchased with a gross vehicular weight rating of >8,500 pounds beginning in 2024 to be ZEVs, with 100% of purchases being ZEVs beginning in 2027. The City has roughly 100 vehicles that fit this definition.

Roughly 8 to 10 of these vehicles are replaced annually. This means the City needs to install charging infrastructure for 4 to 5 vehicles in use at the Corporation Yard now, with additional chargers installed each year as the fleet is converted to ZEV’s.

Completion of this electrical infrastructure is necessary to support this project at other City sites and to enable future charging of mandated replacement vehicles as older gasoline and diesel units are replaced in the coming years. The key component of this project is the planning for the extreme amount of required Kilowatt voltage that must be pulled into the City-designated sites to support the large vehicle volume that will be utilizing the electric vehicle chargers. Funding for this project will come from the General Fund, Solid Waste Enterprise ($169,063), Water Enterprise ($148,377) and Wastewater Enterprise ($121,115) funds. The City was also conditionally approved for $2,655,453 in grant funding by 1) Bay Area Air Quality Management District ($1,876,200), 2) Energy Infrastructure Incentives for Zero-Emission Commercial Vehicles ($522,253), and 3) PG&E EV Fleet Electrification Program ($257,000). In addition to the conditionally approved grants, up to $569,000 is expected from an Inflation Reduction Act Solar Investment Tax Credit. If this additional funding is received, the General Fund and Enterprise Fund expenditures will be eliminated or reduced accordingly. There will be future annual O&M costs consisting of routine maintenance and minor repairs of the charging stations.

Project Category: Community Facilities Improvements
Location: Corporation Yard
Project Manager: C. Ziemann
Project Priority: 1B - Mandatory
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $5,000
Public Art
Requirement: Exempt
General Plan Policy: CIR-2-5
116
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 180 of 1460 ends

Project Title: *MULTI-YEAR* Project #:

Fleet Electrification (continued) 337-37265
PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90050 Construction 647,488 1,498,460 1,147,961 $ 3,293,909 TOTAL $ 647,488 $ 1,498,460 $ 1,147,961 3,293,909 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 199,901 $ 199,901
47-Var Enterprise 438,555 $ 438,555
47-Var Federal/State/Agency 1,876,200 522,253 $ 2,398,453 Other 257,000 $ 257,000
TOTAL $ 2,514,656 $ 779,253 3,293,909 $

PROJECT FINANCING CURRENT PROPOSED

117
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 181 of 1460 ends

Project Title: Project #:

Housing Element Update – 7th Cycle
Description/Justification:

This project consists of a required update of the Housing Element of the City’s General Plan for the 7th Cycle. It will include clarifications and adjustments for changes in State law. This project will require extensive community engagement. Once updated, the Housing Element will be consistent with State requirements and the Bay Area regional planning cycle. California Environmental Quality Act (CEQA) analysis will be prepared to comply with CEQA.

Project Status:

The planning phase of this project is anticipated to begin in FY 2028/29. The 7th Cycle Housing Element must be completed by January 31, 2031.

Supplemental Information:

This project will be facilitated by the Community Development Department, with input from the other City departments, and will include assistance from professional planning consultants. Funding is provided through General Plan Maintenance fees that have been collected on development projects and reserved in the General Fund.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 1,000 33,450 33,450 $ 67,900
90040 Planning and Design 4,000 267,600 267,600 $ 539,200 90070 Project Administration 1,000 33,450 33,450 $ 67,900 TOTAL 6,000 $ $ 334,500 $ 334,500 $ 675,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 675,000 $ 675,000
TOTAL 675,000 $ 675,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvements
Location: Citywide
Project Manager: A. Morris
Project Priority: 1E - Mandatory
Est. Completion Date: 2030/31
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: LU 2
118
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 182 of 1460 ends

Project Title: Project #:

Hydrodynamic Separator at Marsh Creek

Description/Justification:

This project consists of the installation of one hydrodynamic separator (HDS) unit along Brentwood Boulevard to reduce trash and debris from stormwater runoff before it enters Marsh Creek. The HDS unit will serve as a structural stormwater best management practice (BMP) designed to capture gross solids, sediment, and floatable pollutants conveyed through the municipal storm drain system.

Project Status:

The design phase is currently underway, with construction anticipated to begin in FY 2026/27.

Supplemental Information:

Brentwood Boulevard has been identified as a high-priority trash generation corridor. The proposed hydrodynamic separator installation will provide full trash capture treatment for approximately 5,500 linear feet (lf) of Brentwood Boulevard.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90050 Construction 100,000 $ 100,000
TOTAL 100,000 $ 100,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 100,000 $ 100,000
TOTAL 100,000 $ 100,000 $

PROJECT FINANCING CURRENT PROPOSED
Project Category: Community Facilities Improvements
Location: Brentwood Boulevard
Project Manager: B. Wilson
Project Priority: 1C – Mandatory
Est. Completion Date: 2026/27
Future Annual
O & M Impact: $1,000
Public Art
Requirement: Exempt
General Plan Policy:
119
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 183 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Public Art Spaces 337-37244
Description/Justification:

This project consists of the installation of three or more monuments at select locations throughout the City. The project's purpose is to improve the identity of the City at three or more high traffic areas. Two installation sites identified are: the median at Sand Creek Road in front of the Streets of Brentwood; and Brentwood Boulevard adjacent to the Police Station. Installation of “Fields of Time”, adjacent to the Police Station, was completed in late 2025. Installation of “Radiant Convergence”, in the Sand Creek median, is estimated to be completed in late 2026. The Arts Commission will be an active partner in making recommendations to City Council for future installations.

Project Status:

Estimated completion of the two current sites is FY 2026/27.

Supplemental Information:

Funding consists of $157,277 from the Public Art Administration Fund and $629,106 from the Public Art Acquisition Fund. The future annual O & M impact is undetermined at this time. The project was included in the City’s Strategic Plan for FY 2016/17 - FY 2017/18.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 977 7,023 $ 8,000
90040 Planning and Design 15,979 40,021 $ 56,000
90050 Construction 441,000 188,883 $ 629,883
90070 Project Administration 10,000 70,500 $ 80,500
90100 Land/ROW/Acquisitions 12,000 $ 12,000
TOTAL 467,956 $ 318,427 $ 786,383 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL Other 786,383 $ 786,383
TOTAL 786,383 $ 786,383 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvements
Location: Citywide - At major vehicular entry
points
Project Manager: T. Nguyen
Project Priority: 1E - Mandatory
Est. Completion Date: 2026/27
Future Annual
O & M Impact: TBD
Public Art
Requirement: Exempt
General Plan Policy: CSF 5-10
120
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 184 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Solid Waste Carts Upgrade 542-54022

Description/Justification:

This project is necessary to keep the City in compliance with California Senate Bill 1383. This mandate requires the City to move food waste from the garbage cart to the yard waste cart, to update the cart labeling on all three lids and to ensure all three cart colors match the state’s mandated color scheme. The project will replace solid waste cart lids with new language, ensuring the City is in compliance with SB1383.

Project Status:

This work is scheduled to begin in FY 2025/26 and is expected to be completed in FY 2030/31.

Supplemental Information:

This project will be fully funded by the Solid Waste Enterprise Fund.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90050 Construction 250,000 250,000 300,000 300,000 300,000 300,000 $ 1,700,000 TOTAL 250,000 $ 250,000 $ 300,000 $ 300,000 $ 300,000 $ 300,000 $ 1,700,000 $ PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47540 Enterprise 1,010,000 90,000 300,000 300,000 $ 1,700,000 TOTAL 1,010,000 $ 90,000 $ 300,000 $ 300,000 $ 1,700,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvements
Location: Solid Waste Transfer Station, 2301
Elkins Way
Project Manager: J. Carlson
Project Priority: 1B - Mandatory
Est. Completion Date: 2030/31
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1
121
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 185 of 1460 ends

Project Title: Project #:

Solid Waste Transfer Station Updates
Description/Justification:

This project is necessary to keep the City’s transfer station floor in good working condition, expand the floor capacity in order to satisfy requirements of SB 1383 and to accommodate increased operating volumes as the City grows. SB 1383 requires the City to process food waste and organic materials separately, requiring additional floor space. Additional parking spaces will also be created to accommodate additional trucks that have been added to the garbage truck fleet, as operations have grown since the facility’s initial construction in 2014.

Project Status:

The planning and design phase is scheduled to begin in FY 2026/27 and the project is expected to be completed in FY 2027/28.

Supplemental Information:

Funding consists of $1,050,000 from the Solid Waste Enterprise and $1,050,000 from the Solid Waste Replacement Fund.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 90040 Planning and Design 400,000 100,000 $ 500,000
90050 Construction 1,600,000 $ 1,600,000
TOTAL $ 400,000 $ 1,700,000 $ 2,100,000
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47-Var Enterprise 400,000 1,700,000 $ 2,100,000
TOTAL $ 400,000 $ 1,700,000 $ 2,100,000

PROJECT FINANCING CURRENT PROPOSED
Project Category: Community Facilities Improvements
Location: Solid Waste Transfer Station, 2301
Elkins Way
Project Manager: J. Carlson
Project Priority: 1B - Mandatory
Est. Completion Date: 2027/28
Future Annual
O & M Impact: $25,000
Public Art
Requirement: Exempt
General Plan Policy: IF 1-1
122
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 186 of 1460 ends

Project Title: Project #:

Soundwall - Fairview Avenue and Balfour Road

Description/Justification:

The soundwalls along Fairview Avenue and Balfour Road need to be replaced. In October 2023, Wood Rodgers, an independent engineering firm, conducted the “Structural Observation Condition Assessment of Brentwood Soundwall” for a contracted amount of $17,945. Their observations included viewing the wall for any deficiencies structurally or aesthetically. The report identified areas in need of repairs and replacing. For long term maintenance cost planning, the report recommends it would be more cost efficient to replace the wall.

Project Status:

The design phase is anticipated to begin in 2030/31.

Supplemental Information:

This project is currently unfunded. Cost of the project has been projected using current estimates inflated by 3% annually.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 5,000 $ 5,000
90040 Planning and Design 30,000 $ 30,000
90050 Construction 3,211,000 $ 3,211,000
TOTAL 3,246,000 $ 3,246,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL Unfunded 3,246,000 $ 3,246,000
TOTAL $ 3,246,000 $ 3,246,000

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvement
Location: Fairview Avenue and Balfour Road
Project Manager: A. Baquillar
Project Priority: 2B - Necessary
Est. Completion Date: 2030/31
Future Annual
O & M Impact: TBD
Public Art
Requirement: Exempt
General Plan Policy: CSF-2-6
123
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 187 of 1460 ends

Project Title: * MULTI-YEAR * Project #:

Vineyards at Marsh Creek – Theater/Event Center/Amphitheater Phase I 337-37231 Description/Justification:

The project, formerly named “Vineyards at Marsh Creek – Event Center/Amphitheatre”, is located within the Vineyards at Marsh Creek development. Consistent with a development agreement between the City and the developer of the Vineyards at Marsh Creek, the developer has submitted a total of $3.5 million, plus interest, to the City for the design and construction of the project.

Due to cost escalations, Phase I has been revised to consist of a parking lot and multi-use theater and/or event center. Phase II would expand to a 750-seat amphitheater and box office with amenities. Phase II is currently unfunded. Preliminary design & studies on Phase I has commenced and construction is anticipated to begin in Summer 2027.

Project Status:

Preliminary design and studies on Phase I are underway and construction is planned to begin Summer 2027. A Subsequent Envinromental Impact Review was started in 2023 and will be completed prior to construction.

Supplemental Information:

City Council directed staff to gather information for the creation, design, development and construction of a 10,000 square foot, or similar sized, multi-use Theater and/or Event Center. This project is funded by $4,031,058 from the Vineyards Event Center Fund, $350,000 from the Public Art Acquisition Fund and the remainder from the Vineyards Projects Fund. Future annual O & M costs shall be funded through a combination of the General Fund and the Landscape and Lighting Assessment District 06-3 Fund.

This project was included in the City’s Strategic Plan for FY 2022/23 - FY 2023/24.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 6,930 23,070 $ 30,000
90040 Planning and Design 564,577 455,423 150,000 $ 1,170,000 90050 Construction 8,700,000 $ 8,700,000
90070 Project Administration 62,427 125,000 112,573 $ 300,000 TOTAL 633,934 $ 603,493 $ 8,962,573 $ 10,200,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL Other 9,400,000 800,000 $ 10,200,000
TOTAL 9,400,000 $ 800,000 $ 10,200,000 $

PROJECT FINANCING CURRENT PROPOSED

Project Category: Community Facilities Improvements
Location: Subdivision 8796, west of State
Route 4, north of Marsh Creek
Road, south of Fairview Avenue
Project Manager: A. Baquilar/H. Aleem
Project Priority: 1D - Mandatory
Est. Completion
Date:
2027/28
Future Annual
O & M Impact:

Phase I $450,000
Phase II $630,000
Public Art
Requirement: Exempt
General Plan Policy: CSF 1-1
124
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 188 of 1460 ends

Project Title: Project #:

Zoning Ordinance Comprehensive Update
Description/Justification:

This project will comprehensively update the City's Zoning Ordinance to be consistent with the new General Plan, to be consistent with State law and professional best practices and to be easily understood and implemented. The project will include a corresponding environmental review document for CEQA compliance.

Project Status:

This project would begin in FY 2030/31 and is anticipated to be completed in FY 2032/33.

Supplemental Information:

This project will be facilitated by the Community Development Department, with input from the other City departments, and will include assistance from professional planning consultants and environmental consultants. The project will commence following the comprehensive update of the General Plan and substantial completion of the Housing Element Update and is expected to take approximately 24 months, spanning FY 2030/31 through FY 2032/33.

PROJECT EXPENDITURES Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 70239 Legal 1,500 $ 1,500
90040 Planning and Design 438,500 $ 438,500
90070 Project Administration 10,000 $ 10,000
TOTAL 450,000 $ 450,000 $
PROJECT FUNDING Prior 2026/27 2027/28 2028/29 2029/30 2030/31 TOTAL 47100 General Fund 450,000 $ 450,000
TOTAL 450,000 $ 450,000 $

PROJECT FINANCING CURRENT PROPOSED
Project Category: Community Facilities Improvements
Location: Citywide
Project Manager: A. Morris
Project Priority: 1E - Mandatory
Est. Completion Date: 2032/33
Future Annual
O & M Impact: $0
Public Art
Requirement: Exempt
General Plan Policy: LU 1, LU 6
125
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 189 of 1460 ends

Future Improvements
The Future Improvements section includes any improvements that are planned, but currently unfunded.

All-Access Playground
Project Manager: A. Wanden
Location: Shady Willow Lane/Grant Street (APN 0190-31004) Description/Justification:

This project will construct an all-access playground on a 0.98 acre parcel. The current cost estimate for this project is $800,000.

Brentwood Boulevard and Guthrie Lane Traffic Signal
Project Manager: A.Pillai
Location: Brentwood Boulevard and Guthrie Lane
Description/Justification:

This project will construct a traffic signal and related intersection improvements including signage, striping and handicap ramps at the intersection of Brentwood Boulevard and Guthrie Lane. The Police Station is located in the southeast corner of this intersection. Currently, the traffic conditions do not warrant a traffic signal at this location; however, the City is monitoring traffic levels and will re-evaluate the situation if the need arises. The Pike project, or Harvest Commerce Center, located on the northeast corner, paid $5,400 for their fair share of the traffic signal.

The current cost estimate for this project is $500,000.

Brentwood Boulevard Beautification
Project Manager: A. Pillai & A. Wanden
Location: Brentwood Boulevard between Downtown and Sunset Road Description/Justification:

Construct and install elements for the beautification of Brentwood Boulevard between Downtown and Sunset Road to enhance economic development and improve the quality of life for residents. Elements will include:
sidewalk, curb, and gutter; planter strip; landscaping; green infrastructure; and utility improvements. Current cost estimate for this project is $3,000,000.

Brentwood Boulevard Sewer and Water Main
Project Manager: A. Pillai
Location: Brentwood Boulevard from Lone Tree Way to 200’ south of Delta Road Description/Justification:

This project will install a 12" sewer main, 12" water main and 8" non-potable water main, approximately 2,360', along Brentwood Boulevard from Lone Tree Way to 200' south of Delta Road. This project will also provide lateral stubs for Sims Road, service laterals for existing properties along Brentwood Boulevard, and sewer and water service for existing residents and future development along Brentwood Boulevard north of Lone Tree Way. This project is contingent upon future development along Brentwood Boulevard. At the appropriate time, the City will investigate a variety of funding sources, including development contributions, should the adjacent properties be developed. The current cost estimate for this project is $4,750,000. 126
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 190 of 1460 ends

Future Improvements
Brentwood Boulevard Widening North - Phase II
Project Manager: A. Pillai
Location: Brentwood Boulevard from Homecoming Way to Lone Tree Way Description/Justification:

This project will continue the widening of Brentwood Boulevard (120 foot right-of-way) with two lanes in each direction (approximately 2,300 linear feet (lf)) and will include: two bike lanes, curb and gutter, sidewalks, street lights, green infrastructure and minor landscaping on each side of the roadway. This project will also include moving the overhead power lines, telephone lines and cable lines underground, where feasible. This project will improve safety and traffic flow, and facilitate adjacent development. Brentwood Boulevard Widening North is broken up into three phases. Phase II is from Homecoming Way to Lone Tree Way. The City will be applying for Federal grants as they become available. Current cost estimate for this project is $12,250,000.

Brentwood Boulevard Widening North - Phase III
Project Manager: A. Pillai
Location: Brentwood Boulevard from Lone Tree Way to 200 feet south of Delta Road Description/Justification:

This project will continue the widening of Brentwood Boulevard (120 foot right-of-way) with two lanes in each direction (approximately 2,400 lf) and will include: bike lanes, curb and gutter, 16 foot median, sidewalks, street lights, green infrastructure and landscaping on each side of the roadway. This project will also include moving the overhead power lines, telephone lines and cable lines underground, where feasible. This project will improve safety and traffic flow, and facilitate adjacent development. Brentwood Boulevard Widening North is broken up into three phases. Phase III is from Lone Tree Way to 200 feet south of Delta Road. The City will be applying for Federal grants as they become available. Current cost estimate for this project is $14,100,000.

Brentwood Boulevard Widening South
Project Manager: A. Pillai
Location: Brentwood Boulevard from Chestnut Street to Fir Street Description/Justification:

This project will continue the widening of Brentwood Boulevard (100 foot right-of-way) with two lanes in each direction (approximately 1,500 lf), from Chestnut Street to Fir Street, to improve vehicular movement through the City. The project will include bike lanes, curb and gutter, medians, sidewalks, street lights, green infrastructure and landscaping. This project will improve traffic flow and provide smooth progression along Brentwood Boulevard. The City began to maintain this roadway in 2012 when the California Department of Transportation relinquished Brentwood Boulevard to the City. This project is part of the City's overall Master Plan and is expected to be built at a date to be determined. Current cost estimate for this project is $10,600,000.

CCWD Trail (Brighton Station Segment)
Project Manager: J. Ellis
Location: CCWD right-of-way, parallel to State Route 4 between Empire Avenue and Grant Street Description/Justification: This project will provide safe, off-street trail access to schools for children and provide non-motorized transportation connections in the community on the East Bypass (formerly CCWD) trail. The completion of this trail is necessary to carry out the Parks, Trails and Recreation Master Plan to connect subdivisions, parks, schools and amenities throughout the community. Discovery Builders was required, through the conditions of approval, to develop this trail as part of the Brighton Station Project. Discovery Builders was unable to secure right of entry from the adjacent property owner to build the trail; therefore, they paid the City $161,283, and at the time of receipt, the equivalent of the construction costs for the trail. The City will be responsible for building the trail and is currently in negotiations with the surface rights holder to quitclaim interest 127
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 191 of 1460 ends

Future Improvements
to CCWD. The development contribution is currently being held in the Parks and Trails Development Impact Fee Fund.

City Fiber Optic Connection - Phase II
Project Manager: A. Pillai & M. Baria
Location: Citywide
Description/Justification:

The IT Master Plan has determined missing fiber optic segments that would provide the City with a complete fiber optic ring. This project will also install fiber to connect various City facilities including parks, water reservoirs, pump stations, and traffic signals. The additional fiber connections will give the City a redundant network path, bring availability of gigabit services to connected facilities and will lay the groundwork for future technology improvements such as the installation of surveillance cameras and expansion of the City's Wi-Fi network into additional City parks. The project is currently unfunded, but will be implemented in phases based on priority as funding becomes available. The IT Master Plan identified a cost range for this project which will be refined as the project scope is finalized. This project was previously designed under CIP #337-37237 and $25,784.86 was capitalized in FY 2019/20.

City Park Shade and Dance Floor (Stage Area)
Project Manager: A. Wanden
Location: City Park
Description/Justification:

There has been a request for an expansion of the dance floor by the staging area to allow more hard surface areas for dancing or performances at various City events. Additional shade is desired to help shield performers during the summer months. Both additions would enhance the experience for both the guests and performers at City Park. The current cost estimate for this project is $93,000.

Citywide Overhead Utility Replacement – Phase II
Project Manager: A. Pillai
Location: Citywide
Description/Justification:

This project undergrounds overhead utilities along portions of major streets utilizing Rule 20A PG&E credits and converts adjacent properties from overhead to underground service connections where necessary. Fairview Avenue has been identified as the top priority for the next utility conversion. Phase I undergrounded Fairview Avenue from Sand Creek Road to San Jose Avenue in 2018. Phase II will complete the remainder of Fairview Avenue between San Jose Avenue to Deer Creek Channel (north of Summerwood Drive). This project will aesthetically enhance portions of Fairview Avenue. There is a remaining balance of approximately $418,000 in work credits allocated by PG&E that is available to the project through 2033. The estimate for construction of this project is $1,600,000.

Facilities Emergency Back-up Generators
Project Manager: A. Pillai
Location: Community Center and Brentwood Senior Activity Center (BSAC) Description/Justification:

In the event of an emergency, the City of Brentwood will need to maintain power to critical infrastructure in order to provide critical services to the residents. The Community Center and the Senior Center have been identified as emergency shelters and cooling sites, and emergency back-up generators will be needed to maintain these critical 128
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 192 of 1460 ends

Future Improvements
services. The City will seek grant funding to fund the emergency back-up generators. The estimated construction cost is $890,000.

Gregory Lane and Sunrise Drive Drainage Improvements
Project Manager: A. Pillai
Location: Gregory Lane and Sunrise Drive
Description/Justification:

This project will widen the existing pavement on Gregory Lane and Sunrise Drive; install curb and gutter, and new storm drain pipe to improve drainage. The existing roadways rely on drainage swells to drain water to the channel.

Portions of the drainage swells have been filled by residents wanting on-street parking in front of their homes.

Other portions of the drainage swell do not appear to operate as originally designed. These problems have caused City crews to respond to reports of flooding on multiple occasions. This project is currently unfunded. Funding sources, such as grants, will be explored. Current cost estimate for this project is $1,650,000.

Heron Park Restroom
Project Manager: A. Wanden
Location: 950 Garin Parkway
Description/Justification:

This project will construct fully operational restroom at Heron Park. Heron Park has informal sports fields used by various residents and contains a highly utilized playground area that is adjacent to the Dakota Trail and is a destination park for many users. Heron Park meets the criteria for needing a restroom. Adding restrooms to City parks was a top priority item brought to the City’s attention in the 2019 Parks, Trails and Recreation Master Plan Update. The future annual O & M impact consists of maintenance, restroom supplies and adding the new restroom to the restroom and trash can servicing contract. The current cost estimate for this project is $300,000.

Marsh Creek Sewer Constriction Upgrade
Project Manager: A. Pillai
Location: Marsh Creek sewer crossing, north of Sunset Road, between sewer manholes 2450 and 2462 Description/Justification:

The existing 12-inch sewer main crossing at Marsh Creek, for the Lone Tree Way sewer trunk main, is currently adequate, but in the future will constrict the sewer flow and cause upstream surcharges when upstream development resumes. To prevent the potential for this surcharge, and to accommodate future development growth, an 18-inch replacement or 12-inch parallel sewer main crossing is recommended by the Brentwood Wastewater Collection System Master Plan Update. Current cost estimate for this project is $390,000.

Priority Area 1 Mitigation Measures
Project Manager: A. Pillai
Location: Priority Area 1
Description/Justification:

This project will construct various mitigation measures identified in the Priority Area 1 (PA1) Master Plan. These mitigation measures will be built when the additional traffic from the various development projects in PA1 begins to create the anticipated traffic impacts.
129
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 193 of 1460 ends

Future Improvements
Reservoir 1.4 - Zones 1 and 2
Project Manager: A. Pillai
Location: Vicinity of Innovation Center @ Brentwood Development Description/Justification:

Construct a 4.0 million gallon reservoir near the proposed Bridle Gate Development, which will store water from Zone 1 and pump to Zone 2 during high (peak) water demands and fire flow demands. Currently, Zone 2 customers receive water from Zone 1 through an 18” water transmission main on Heidorn Ranch Road. This project will improve the water circulation and pressures for the end-users in Zone 2. This project is contingent upon future development in the proposed Bridle Gate project and Innovation Center @ Brentwood. At the appropriate time, the City will investigate a variety of funding sources, including Development Impact Fees, should the adjacent property be developed. Spring 2022 cost estimate for this project is $16,410,000.

Water Treatment Plant Expansion
Project Manager: C. Wichert
Location: TBD
Description/Justification:

This project will increase the capacity of the water treatment system to provide an adequate supply of safe drinking water for the ultimate build-out population of the City. Upon completion of a water supply alternatives analysis, the most beneficial and cost-effective alternative will be selected. Spring 2022 cost estimate for this project is $100,000,000.

Windsor Way Park Expansion
Project Manager: J. Ellis
Location: Sycamore Court and Sycamore Avenue
Description/Justification:

This project comprises the expansion of Windsor Way Park to the adjacent City-owned, two-acre parcel. Facilities will include a large turf play area, new park amenities and play structure, and is anticipated to include a small community/resource center building. The park expansion will add needed community facilities to an existing, very small park that currently only contains a play apparatus and basketball court. The current preliminary cost estimate for the project, as anticipated following the adoption of the 2019 Parks, Trails and Recreation Master Plan and Fall 2019 City Council Strategic Planning sessions, is between $2M and $5M. Future construction of this project is unfunded at this time.
130
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 194 of 1460 ends

Development Improvements
The Development Improvements section includes any improvements to be developed or built by a developer or builder in conjunction with the improvements necessary to support their project. These improvements will ultimately be offered for dedication to the City. For the purposes of this document, the Development Improvements are those that provide an area-wide benefit not specific to the project.

American Avenue Extension
Project Manager: A. Pillai
Location: American Avenue from the existing end of improvements along Heritage High School and Adams Middle School back to Balfour Road
Description/Justification:

This project includes the acquisition of approximately 3,900 linear feet of 140 foot wide right-of-way with two travel lanes in each direction separated by a 16 foot wide median, bike lanes, approximately 20 feet of landscape on both sides of the street, green infrastructure and updating existing improvements to current ADA Standards. This project will also install water, non-potable water, sanitary sewer and storm drain mains.

In addition, a traffic signal will be required at the new intersection of Balfour Road and the American Avenue Extension. This project will facilitate circulation to the adjacent properties should they be annexed into the City and developed. This project is currently outside City limits and the urban limit line but is within the City's planning area and General Plan. This project will be incorporated into future development conditions of approval and will be developer funded. Current cost estimate for this project is $10,300,000.

Anderson Lane Widening
Project Manager: A. Pillai
Location: Anderson Lane from Lone Tree Way north to Neroly Road Description/Justification:

Widening of the existing 2,600 linear feet of Anderson Lane to a 60 foot wide residential collector street, including: extension of water and sewer mains, 8 foot bike lanes in each direction, green infrastructure, landscaping on each side of the road, a 5 foot detached sidewalk and updating adjacent existing improvements to current ADA Standards. Full improvements are required for 920 linear feet of roadway and 1,680 linear feet of widening. This project is necessary to facilitate development in the area and to improve traffic flow. Some of the improvements (new sidewalk, pavement widening, street lights and landscaping) on the west side of the street were built by Pulte Homes as a part of the Brentwood Parks Subdivision. The remaining unimproved portions of this street will be incorporated into future development conditions of approval and will be funded by a developer(s). Current cost estimate for this project is $2,700,000.

Balfour Road Widening West
Project Manager: A. Pillai
Location: Balfour Road from American Avenue to Deer Valley Road Description/Justification:

Widen 7,300 linear feet of existing Balfour Road to a 140-foot wide arterial street including: two travel lanes in each direction separated by a 16-foot wide median, bike lanes, green infrastructure, landscaping, 12-inch sewer line, 16-inch water line and storm drain. This project also includes construction of the south portion of Balfour Road (approximately 800 linear feet) from American Avenue west to the City limit line and update all existing improvements to current ADA Standards. This project will improve traffic flow and safety, and provide adequate access to school sites for the orderly development of the area. This project is currently outside the City limits and urban limit line but within the City's planning area and General Plan. This project will be incorporated into future development conditions of approval and will be developer funded. A portion of the 131
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 195 of 1460 ends

Development Improvements
funding will be reimbursed from the City’s Development Fee Program. Current cost estimate for this project is $15,500,000.

East Bypass (formerly CCWD) Trail (Amber Lane Segment)
Project Manager: J. Ellis
Location: CCWD right-of-way parallel to State Route 4 between the Grant Street trail and Amber Lane Description/Justification:

This project will provide safe, off-street trail access to schools for children and provide non-motorized transportation connections in the community on CCWD trail. The completion of this trail is necessary to carry out the Parks, Trails and Recreation Master Plan to connect subdivisions, parks, schools and amenities throughout the community and the Innovation Center @ Brentwood planning area. Per the conditions of approval for the Amber Lane Apartments project and with assistance of the City, the developer will pursue approval from CCWD to construct this trail segment. The City is currently in negotiations with the surface rights holder to quitclaim interest to CCWD. A portion of these improvements may be reimbursable through the City’s Development Fee Program.

Empire Avenue Extension North - Phase II
Project Manager: A. Pillai
Location: Empire Avenue from 400 feet north of Lone Tree Way to City limits Description/Justification:

Complete the widening along the east side of Empire Avenue to a 140 foot wide arterial street for 1,400 feet in length consisting of curbs, gutters, sidewalks, bike lanes, green infrastructure, landscaping and median, including the undergrounding of overhead utilities and 12-inch non-potable water line. This project is necessary to improve traffic flow and safety, and facilitate the development of adjacent and nearby properties.

The project has been and will be incorporated into future development conditions of approval and will be developer funded. A portion of the funding will be reimbursed from the City’s Development Fee Program.

This project will only widen lanes on the east side of the street, as the west half of the street is the City of Antioch's responsibility. Segments of the project are currently under construction as a part of development along Empire Avenue. The current cost estimate for this project is $2,375,000.

Fairview Avenue Improvements - Phase VII
Project Manager: A. Pillai
Location: Fairview Avenue from Grant Street to approximately Fairview Court Description/Justification:

Complete the widening along the west side of Fairview Avenue to a 60-foot wide residential collector street for 1,800 feet in length. Improvements shall include the installation of soundwalls, curb and gutter, sidewalk, water (existing 20-inch water line and proposed 12-inch non-potable water line) and 12-inch proposed sewer and service lines to the west side properties as a residential collector street. This project will improve traffic flow and safety, and facilitate adjacent development. This project will be incorporated into future development conditions of approval and will be developer funded as adjacent properties are developed. The current cost estimate for this project is $3,000,000.
132
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 196 of 1460 ends

Development Improvements
Fairview Avenue Improvements - Phase VIII
Project Manager: A. Pillai
Location: Fairview Avenue from Sand Creek Road to Apricot Way Description/Justification:

Complete the widening along the west side of Fairview Avenue for 1,600 linear feet including soundwalls, curb and gutter, sidewalk, 8-inch non-potable water line, 8-inch sewer and utility services to the westerly properties.

This project will improve traffic flow and safety, and facilitate adjacent development. This project will be incorporated into future development conditions of approval and will be developer funded as adjacent properties are developed. The current cost estimate for this project is $2,450,000.

Hanson Lane Neighborhood Parks: Hanson Park and Salmon Park Project Manager: J. Ellis
Location: The eastern terminus of Hanson Lane bounded by Marsh Creek to the east, the extension of Lone Tree Drive to the north and existing residential to the west.

Description/Justification:

This project fulfills the need for neighborhood parks as specified in the most recent Parks, Trails and Recreation Master Plan and is a condition of approval for Subdivision No. 9574. The developer will be reimbursed from the City’s Development Impact Fee Program for 1.5 acres of the 1.63 acres of park the developer is required to build as per the project conditions of approval.

Heidorn Ranch Road - Phase II
Project Manager: A. Pillai
Location: Heidorn Ranch Road from East Bay Municipal Utility District (EBMUD) aqueduct to the Sand Creek Road extension west of State Route 4
Description/Justification:

Roadway improvements consisting resulting in a 140-foot wide four-lane arterial roadway approximately 1,700 feet long. The Improvements consist of two travel lanes in each direction separated by a 16-foot median, storm drain, 12-inch sewer, 16-inch water line, 12-inch non-potable water line, bike lane, sidewalk, green infrastructure and landscaping on both sides of the roadway. The City of Antioch’s developer is constructing this project and sharing the cost per the agreement with City of Brentwood. This project will improve and facilitate the orderly development of the adjacent properties. The remaining improvement on east side of this roadway will be incorporated into future development conditions of approval and will be developer funded.

A portion of the funding will be reimbursed from the City’s Development Fee Program and a portion is shared with the City of Antioch.

John Muir Parkway Extension/Foothill Drive Extension
Project Manager: A. Pillai
Location: John Muir Parkway from Ventura Drive to Foothill Drive extension and Foothill Drive from current southern terminus to John Muir Parkway
Description/Justification:

Construct 2,000 feet of road including: a 16 foot median, two 12 foot lanes, 12-inch water main, 24-inch storm drain, 8-inch sewer main, 12-inch non-potable water main, green infrastructure, median landscaping, street lights and extend Foothill Drive approximately 600 feet to John Muir Parkway. This section of roadway will replace the existing Concord Avenue, which was displaced by State Route 4. The relocation of the existing Concord Avenue is necessary to ensure continued traffic circulation in the area. It will provide north/south traffic circulation, access to surrounding properties and connect to the terminus of existing Foothill Drive. This project was previously designed under CIP #336-31640 and $1,231,501.35 was capitalized in FY 2019/20. 133
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 197 of 1460 ends

Development Improvements
John Muir Parkway Widening
Project Manager: A. Pillai
Location: John Muir Parkway from Eagle Rock Avenue to the north boundary of Deer Creek Subdivision No. 8352
Description/Justification:

Widen approximately 1,140 linear feet of John Muir Parkway to a collector street within 96 feet of right of way.

As there are existing 12-inch water and non-potable water lines, improvements shall include curb and gutter, 18-inch storm drain, 12-inch sewer lines, 5-foot wide sidewalk, irrigation, green infrastructure and landscaping within the median and on both sides of the street, soundwall (as required) and updating all existing improvements to meet current ADA Standards. This project will be incorporated into future development conditions of approval and will be developer funded. The current cost estimate for this project is $1,750,000.

Lone Tree Way Sewer Interceptor
Project Manager: A. Pillai
Location: Lone Tree Way from Arroyo Seco Road to the Wastewater Treatment Plant Description/Justification:

Install 2,200 feet of 12-inch sewer main within Lone Tree Way from Arroyo Seco Road, until it crosses Marsh Creek, to the Wastewater Treatment Plant. This new interceptor sewer main will provide sewer service to the northerly region of Brentwood, which currently does not have any sewer treatment service, and will also relieve some of the sewer flow demand from the existing sewer system to the Wastewater Treatment Plant. The Brentwood Wastewater Collection Systems Master Plan Update has identified the need for adding an interceptor sewer main to service the northerly and westerly regions of Brentwood as development progresses. The current sewer system will be unable to adequately convey future development sewer flows.

It is more cost effective to build the new interceptor sewer main than to upsize the existing sewer system.

This project will be incorporated into future development project conditions of approval and the City will reimburse the developer per the City’s Development Fee Program. The current cost estimate for this project is $1,380,000.

Lone Tree Way Widening - Brentwood Boulevard
Project Manager: A. Pillai
Location: Lone Tree Way from Tilton Lane to Brentwood Boulevard Description/Justification:

Approximately 3,500 linear feet of divided roadway improvements consisting of widening the roadway (two lanes in each direction) within 140-foot right-of-way separated by 16-foot wide medians, installation of curb and gutter, sidewalk, soundwalls, non-potable water line, green infrastructure, landscaping, drainage, undergrounding of overhead lines and utility relocations. The project also includes acquiring right-of-way to achieve the necessary 140-foot right-of-way width. Widening the roadway up to two lanes in each direction and installing left turn lanes will facilitate adjacent development. This project will be incorporated into the future development project conditions of approval and will be partially developer funded and by the City’s Development Fee Program. The current cost estimate for this project is $6,440,000. 134
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 198 of 1460 ends

Development Improvements
Minnesota Avenue Realignment
Project Manager: A. Pillai
Location: Minnesota Avenue at Grant Street west of Union Pacific Railroad Description/Justification:

This project proposes to realign Minnesota Avenue westerly, away from the Union Pacific Railroad crossing, to create a tangent intersection with Grant Street. These improvements will consist of two vehicle travel lanes, bike lanes, curb and gutter, sidewalk, green infrastructure and landscaping within 60-foot right-of-way for approximately 1,600 linear feet. This project will be incorporated into the conditions of approval of surrounding developments and will be developer funded. A small portion of the roadway improvements were previously built by Subdivision No. 8808. The current cost estimate for this project is $2,300,000.

O’Hara Avenue Improvements
Project Manager: A. Pillai
Location: O'Hara Avenue from Second Street to Sand Creek Road Description/Justification:

This project will widen 2,200 linear feet of O’Hara Avenue to a 120-foot wide collector street and includes two travel lanes in each direction separated by a median island, installation of curb and gutter, sidewalk, sound walls, bike lanes, green infrastructure and landscaping on both sides of the street. The improvements will also include an 8-inch non-potable line and a 10-inch sanitary sewer line. This roadway project will improve the northbound and southbound vehicular traffic. This project will be incorporated into the conditions of approval of future adjacent development projects and primarily developer funded. A portion of the funding will be reimbursed through the City’s Development Fee Program. The current cost estimate for this project is $3,900,000.

O’Hara Avenue Widening
Project Manager: A. Pillai
Location: O'Hara Avenue from Lone Tree Way to Neroly Road Description/Justification:

Widen existing O'Hara Avenue from a two-lane road to a four-lane arterial within 140-foot right-of-way for a length of approximately 2,800 feet, including landscape median, walls, 30-inch water line, 42-inch storm drain line, 12-inch sanitary sewer line, 12-inch non-potable water line and undergrounding existing overhead lines.

This project will provide additional traffic capacity along O'Hara Avenue to accommodate future development per the City's Roadway Master Plan. The majority of the street improvements have been completed by Pulte Homes and Richmond American Homes along their project frontage, except for a remaining 1,600 linear foot segment of roadway. The remaining project improvements on the east side will be incorporated into conditions of approval for future adjacent development and will be developer funded. A portion of the funding will be reimbursed through the City’s Development Fee Program. The current cost estimate for this project is $4,600,000.

Parkside Villas Neighborhood Park
Project Manager: J. Ellis
Location: Subdivision No. 8982, north of Sand Creek, south of Apricot Way, west of Fairview Avenue Description/Justification:

Non-reimbursable park space totaling 2.26 acres. This project fulfills the need for neighborhood parks as specified in the most recent Parks, Trails and Recreation Master Plan and is a condition of approval for Subdivision No. 8982. The developer will not be reimbursed from the City’s Development Impact Fee Program for this park per the project conditions of approval.
135
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 199 of 1460 ends

Development Improvements
San Jose Avenue Extension - Phase II
Project Manager: A. Pillai
Location: West end of San Jose Avenue, adjacent to Brentwood Hills subdivision, continuing as a northwesterly extension to Sand Creek Road
Description/Justification:

Extend San Jose Avenue 2,300 linear feet as a modified collector roadway within varying right-of-way (60 foot – 86 foot) consisting of a vehicle travel lane and a bike lane in each direction, sidewalk with parkway landscaping on each side, storm drain, green infrastructure, water line and non-potable water line. The northerly extension, connecting to Sand Creek Road, will also include vehicle turn lanes onto Sand Creek Road.

This project is required to improve traffic flow and safety and provides alternate access to State Route 4 from the area west of State Route 4. It will also provide access for future commercial development in the northwest quadrant of the city. This project will be incorporated into future development project conditions of approval and will be developer funded except for the 16-inch Zone I water line. A portion of the funding will be reimbursed through the City’s Development Fee Program. The current cost estimate for this project is $3,200,000.

Seecon 7590 & 7560 Lone Tree Way Neighborhood Park
Project Manager: J. Ellis
Location: Subdivision No. 9597, East of O’Hara Avenue, west of Tilton Lane, south of Bonnie Lane Description/Justification:

This project fulfills the need for neighborhood parks as specified in the most recent Parks, Trails and Recreation Master Plan and is a condition of approval for Subdivision No. 9597. The developer will be reimbursed from the City’s Development Impact Fee Program for this park per the project conditions of approval. The park will include playground equipment, seating areas and a shade structure.

Shady Willow Lane Extension - Phase II
Project Manager: A. Pillai
Location: Shady Willow Lane from Grant Street to Sand Creek Road Description/Justification:

Widen 1,280 linear feet of Shady Willow Lane to a four-lane arterial street, with existing 140-foot right-of-way, consisting of curb and gutter, sidewalk, wall, bike lanes, green infrastructure, landscaping in the median and parkway and a bridge over Sand Creek. There is an existing 16-inch water line and proposed is a 12-inch nonpotable water line and 10-inch sewer line for missing portion. This project is necessary to improve traffic circulation in the northwest quadrant and alleviate traffic congestion on Fairview Avenue. This project will be incorporated in the developer's conditions of approval and will be funded by the developer. A portion of the funding will be reimbursed from the City’s Development Fee Program. The majority of the improvements, such as widening of the east and west side, median landscape, most of the parkway landscaping and the bridge over Sand Creek, have already been built by the development on the east and west side. The remaining improvements along the Maggiora parcel will be built when that property develops. The current cost estimate for this project is $3,250,000.
136
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 200 of 1460 ends

Development Improvements
Shady Willow Lane Widening
Project Manager: A. Pillai
Location: Shady Willow Lane from southern boundary of Arbor Ridge Apartments to Amber Lane Description/Justification:

Widen 700 linear feet of existing two-lane Shady Willow Lane to an arterial street within 140-foot wide rightof-way, consisting of curb and gutter, wall, sidewalk, bike lanes, undergrounding of existing overhead utilities, landscaping and two lanes in each direction separated by a median island. Project also includes a traffic signal at the intersection of Shady Willow and Amber Lane. There is existing 16-inch water line and 10-inch sewer and proposed 12-inch non-potable water line. This project is necessary to improve traffic circulation and to facilitate the orderly development of the area. The majority of the improvements have already been completed except the widening on the west side of Shady Willow Lane, which will be incorporated into the conditions of approval when the adjacent property develops. A portion of the funding will be reimbursed from the City’s Development Fee Program. This project will provide another north/south arterial link between commercial centers on Lone Tree Way and Sand Creek Road. Current cost estimate for this project is $2,300,000.

Stonebrook Neighborhood Park
Project Manager: J. Ellis
Location: South of Sand Creek Road, northwest of San Jose Avenue Description/Justification:

This project fulfills the need for neighborhood parks as specified in the most recent Parks, Trails and Recreation Master Plan and is a condition of approval for Subdivision No. 9586. The developer will be reimbursed from the City’s Development Impact Fee Program for this park per the project conditions of approval. Parcel A is

8.49 acres of which 4.35 acres are usable park space with less than three percent slope and is reimbursable.

The non-reimbursable Parcel “H” is for open space and trail purposes. The developer will construct a 10 foot wide asphalt multi-use trail on Parcel “H” from the southern boundary of the Project at the existing terminus of Black Gold Trail, thence to the extension of Sand Creek Road adjacent to the park in Parcel ‘A’.

Trumark Trailside Neighborhood Park
Project Manager: J. Ellis
Location: Subdivision No. 9610, north of Sand Creek, south of Apricot Way, west of Fairview Avenue Description/Justification:

Non-reimbursable park space totaling 2.169 acres. This project fulfills the need for neighborhood parks as specified in the most recent Parks, Trails and Recreation Master Plan and is a condition of approval for Subdivision No. 9610. The developer will not be reimbursed from the City’s Development Impact Fee Program for this park per the project conditions of approval.
137
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 201 of 1460 ends

Appendix

ACRONYMS
This document includes numerous abbreviations and acronyms in need of explanation. Thus, a list of acronyms is provided to aid the reader when the context does not define the meaning.

ABAG – Association of Bay Area Governments
ADA – Americans with Disabilities Act
AMI – Advanced Metering Infrastructure
AMR – Automatic Meter Reading
ATS – Automatic Transfer Switch
BFAC – Brentwood Family Aquatic Center
CCCFCD – Contra Costa County Flood Control District
CCTA – Contra Costa Transportation Authority
CCWD – Contra Costa Water District
CFD – Community Facilities District
CIFP – Capital Improvement Financing Program
CIP – Capital Improvement Program
ECCRFFA – East Contra Costa Regional Fee and Financing
Authority
FY – Fiscal Year
GAAP – Generally Accepted Accounting Principles
GASB – Governmental Accounting Standards Board
GFOA – Government Finance Officers Association
ITS – Intelligent Transportation System
LED – Light-Emitting Diode
LF – Linear Foot/Feet
LLAD – Landscape and Lighting Assessment
District
MGD – Millions of Gallons per Day
MTC – Metropolitan Transportation Commission
NPDES – National Pollution Discharge
Elimination System
O & M – Operating and Maintenance
OBAG – One Bay Area Grant
PEG – Public, Education and Government
PMP – Pavement Management Program
RMRA – Road Maintenance and Rehabilitation
Account
ROW – Right-of-Way
S&P – Standard and Poor’s Rating Service
SB – Senate Bill
SCADA – Supervisory Control and Data
Acquisition
SRF – State Water Resources Control Board
Revolving Fund
SSMP – Sanitary Sewer Management Plan
VFD – Variable Frequency Drive
WWTP – Wastewater Treatment Plant

138
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 202 of 1460 ends

Appendix

GLOSSARY OF TERMS
Account
A subdivision within a fund for the purpose of classifying transactions.

Account Number
Numeric identification of the account. Typically a unique number or series of numbers. The City’s account number structure is comprised of three fields of characters. The first field is three characters wide and identifies the various unique funds within the accounting system. The next field contains either four or five characters and identifies the division within the City. The final field contains seven characters and identifies the object code of the account number. The same object code may be used in many divisions. The combination of the three fields provides for a unique number for the transaction.

Accrual Basis of Accounting
The method of accounting under which revenues are recorded when they are earned (regardless of when cash is received) and expenditures are recorded when goods and services are received (regardless if disbursements are actually made at that time).

Actual Cost
The amount paid for an asset; not its market value, insurable value, or retail value. It generally includes freight-in and installation costs but not interest on the debt to acquire it.

Adopted Budget
A budget which typically has been reviewed by the public and “Adopted” (approved) by the City Council prior to the start of the fiscal year.

Americans with Disabilities Act
Federal legislation which requires the accessibility of public facilities for handicapped persons.

Annual Comprehensive Financial Report
The financial statements for the City, prepared in conformity with GAAP as set forth by GASB.

Appropriation
An authorization by the City Council to make expenditures and to incur obligations for specific amounts and purposes. All annual appropriations lapse at fiscal year-end.

Assessed Valuation
An official value established for real estate or other property as a basis for levying property taxes.

Assessments
Charges made to parties for actual services or benefits received.

Assets
Government-owned property that has monetary value.
139
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 203 of 1460 ends

Appendix
Average Cost
Total of all costs for all units bought (or produced) divided by the number of units acquired (or produced).

Balance Available
The amount of money available for appropriation or encumbrance. It is the excess of cash and near-cash assets of a fund over its liabilities and reserves; or commonly called surplus available for appropriation. It is also the unobligated balance of an appropriation which may be encumbered for the purposes of the specific appropriation.

Balanced Budget
When there is neither a budget deficit nor a budget surplus – when revenues equal expenditures.

Bond
A municipal bond is a written promise from a local government to repay a sum of money on a specific date at a specified interest rate. Bonds are most frequently used to finance capital improvement projects such as buildings, streets and bridges.

Budget
A plan of financial operation, for a set time period, which identifies specific types and levels of services to be provided, proposed appropriations or expenses and the recommended means of financing them.

Budget Amendments
The Council has the sole responsibility for adopting the City’s budget, and may amend or supplement the budget at any time after adoption by majority vote. The City Manager has the authority to approve line item budgetary transfers between expenditure objects of the budget as long as it is in the same fund and within the same division.

Budget Calendar
The schedule of key dates which City departments follow in the preparation, revision, adoption and administration of the budget.

Budget Detail
A support document to the published budget that details the line item expenditures.

Budget Year
The fiscal year for which the budget is being considered; fiscal year following the current year.

California Society of Municipal Finance Officers
The purpose of this organization is to promote professional administration of municipal finance and to strive for the attainment of professional status of all those responsible for the conduct of the activities of the field.

Capital Improvement Program
A financial plan of authorized expenditures for tangible, long-term construction of, or improvements to, public physical facilities.
140
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 204 of 1460 ends

Appendix
Capital Outlay
Expenditures which result in the acquisition of, or addition to, fixed assets. A capital item is tangible, durable, non-consumable, costs $10,000 or more and has a useful life of more than ten years.

Capital Project Fund
A governmental fund used to account for the acquisition and construction of major capital facilities other than those financed by proprietary funds and trust funds.

Community Facilities District
These funds account for special benefit assessments levied for a variety of allowable uses, including but not limited to police services, joint use school facilities and library facilities. The allowable uses of the funds are governed by the formation documents of each individual District.

Congestion Management Plan
Required for consideration of Measure “J” funding of transportation improvements.

Contingency
An appropriation of funds to cover unforeseen events that occur during the fiscal year such as flood emergencies, Federal mandate shortfalls in revenue and similar events.

Contractual Services
A series of object codes, which include the expense of custodial, janitorial and other services, procured independently by contract or agreement with an individual, firm, corporation or other governmental units.

Controllable Costs
Costs that can be influenced by the department involved, unlike other fixed costs such as rent, which is contracted by lease in advance.

Costs
Amount of money that must be paid to acquire something, purchase price or expense.

Current Fiscal Year
The fiscal year in progress.

Debt Service
The City’s obligation to pay the principal and interest of all bonds and other debt instruments according to a pre-determined payment schedule.

Department
A basic organizational unit of government which is functionally unique in its delivery of services.

Depreciation
The process of allocating the cost of a capital asset to the periods during which the asset is used.

141
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 205 of 1460 ends

Appendix
Development
In real estate, the process of placing improvements on or to a parcel of land; projects where such improvements are being made. Such improvements may include drainage, utilities, subdividing, access, buildings or any combination of these elements.

Direct Labor
Cost of personnel that can be identified in the product or service, such as the salary of the person who provides the direct service.

Division
An organizational component of a department, which may be further subdivided into programs.

Encumbrance
The commitment of appropriated funds to purchase goods or services. An encumbrance is not an expenditure. An encumbrance reserves funds to be expended.

Expenditure/Expense
The outflow of funds paid or to be paid for an asset obtained or goods and services obtained regardless of when the expenditure is actually paid. The term expenditure applies to Governmental Funds. The term expense is used for Enterprise and Internal Service Funds. For complete fund descriptions, refer to the Guide to Funds.

Fee
Cost of a service.

Fiscal Year
The 12-month period for recording financial transactions specified by the City as beginning July 1st and ending June 30th.

Fixed Assets
Assets of long-term character such as land, buildings, machinery, equipment or furniture.

Fixed Cost
A cost that remains constant regardless of volume or demand. Fixed costs include salaries, interest expense, rent, depreciation and insurance expenses.

Forecasts
Estimates of the future impact of current revenue and expenditure policies based on specific assumptions about future conditions such as inflation or population growth. Forecasts are neither predictions about the future nor a statement of policy intentions.

142
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 206 of 1460 ends

Appendix
Fund
A separate accounting entity, with a self-balancing set of accounts, to record all financial transactions (revenues and expenditures) for specific activities or government functions. Funds are classified into three categories: governmental, proprietary or fiduciary. Commonly used funds in governmental accounting are:

General Fund, Special Revenue Funds, Debt Service Funds, Capital Project Funds, Enterprise Funds, Internal Service Funds, Fiduciary Funds and Special Assessment Funds. For complete fund descriptions, refer to the Guide to Funds.

Fund Balance
The excess of assets over liabilities and reserves; also known as surplus funds. This term applies to governmental funds only.

General Obligation Bond
Also referred to as GO Bonds, are usually limited by state law as to the amount as well as the length of indebtedness that a government can have. These “Full Faith and Credit” bonds are secured by all of the financial assets of the local government, including property taxes.

Geographic Information System
A computer based Geographic Information System is being established by the Information Services Division for the tracking and monitoring of development projects.

Goal
A general statement of broad direction, purpose or intent which describes the essential reason for existence and which is not limited to a one-year time frame. Generally, a goal does not change from year to year.

Government Accounting
Principles and procedures in accounting for federal, state and local governmental units. The National Council on Governmental Accounting establishes rules. Unlike commercial accounting for corporations, encumbrances and budgets are recorded in the accounts. Assets of a governmental unit are restricted for designated purposes.

Government Enterprise
Governmentally sponsored business activity. A utility plant may be a government enterprise which raises revenue by charging for its services.

Government Finance Officers Association
A non-profit professional association serving more than 18,000 government finance professionals throughout North America.

Governmental Fund
This category of funds account for all records or operations not normally found in business, such as the General Fund, Special Revenue Funds, Debt Service Funds and Capital Project Funds.

Grant
Contributions or gifts of cash or other assets from another governmental entity to be used or expended for a specific purpose, activity or facility. An example is the Community Development Block Grant awarded by the Federal Government.
143
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 207 of 1460 ends

Appendix
Historical Cost
Actual expenses incurred during the previous fiscal years. The basis for how trends are determined.

Accounting principle requiring that all financial statement items be based on original cost or acquisition cost.

Hourly Billing Rate
The rate of a position on an hourly schedule including the cost of the positions hourly salary plus the hourly fringe benefit costs, plus the division or department overhead costs, plus the City’s general and administrative costs. This “Total” labor cost per hour is used to determine various costs of services provided to the public.

Housing and Community Development
Sets the standards for quality and workmanship in the rehabilitation of rental properties.

Indirect Cost
Costs not directly accountable to a cost object, but included in total cost overhead.

Inflation
Rise in the prices of goods and services, as happens when spending increases relative to the supply of goods on the market.

Infrastructure
The physical assets of the City, such as streets, water, wastewater, public buildings and parks, and the support structures within a development.

Investment
Securities and real estate purchased and held for the production of income in the form of interest, dividends, rentals or base payments.

Jurisdiction
Geographic or political entity governed by a particular legal system or body of laws.

Landscape and Lighting Assessment District Funds
Funds to account for revenues derived from annual assessments which are used to pay the cost incurred by the City for landscape maintenance and street lighting maintenance.

Maintenance of Effort
A criterion that must be met in a street improvement as mandated by the State.

Millage Rate
The tax rate used to calculate local property taxes, expressed in mills per dollar (e.g., 1 mill equals $1 per $1,000 of assessed valuation).

Megahertz
A designation of the broadcast capability of a local government radio system.

144
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 208 of 1460 ends

Appendix
Millions of Gallons Per Day
Rating used in infrastructure water projects.

Net
Figure remaining after all relevant deductions have been made from the gross amount; or to arrive at the difference between additions and subtractions or plus amounts and minus amounts.

Object Codes
Specific numerical classifications for which money is allocated for disbursements. The City uses object codes as the last seven characters of the account number and represents the lowest level of classification within the General Ledger accounting system.

Operating and Maintenance
Cost associated with a capital facility that will impact the City of Brentwood on an ongoing and annual basis.

Operating Expense
A series of object codes which include expenditures for items which primarily benefit the current period and are not defined as personnel services, contractual services or capital outlays.

Ordinance
The laws of a municipality.

Organization
Organized structure of roles and responsibilities functioning to accomplish predetermined objectives.

Organization Chart
A chart showing the interrelationships of positions within an organization in terms of authority and responsibilities. There are basically three patterns of organization: line organization, functional organization and line and staff organization.

Overage
Too much, opposite of shortage.

Overhead
Indirect expenses of running an organization not directly associated with a particular item of service. For example, wages paid to an employee providing a service and the costs of the required materials for performing the service are direct costs. Electricity and building insurance are overhead expenses. By applying a factor called the burden rate, cost accounting attempts to allocate overhead, where possible, to the cost of the services provided.

Overtime
Time worked in excess of an agreed upon time for normal working hours by an employee. Hourly or nonexempt employees must be compensated at the rate of one and one-half their normal hourly rate for overtime work beyond 40 hours in a workweek. Working on holidays or weekends is sometimes referred to as overtime work.
145
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 209 of 1460 ends

Appendix
Pavement Management Software
Software used by project managers to aid in planning and managing roadway improvement projects.

Per Capita
By or for each individual. Anything figured per capita is calculated by the number of individuals involved and is divided equally among all.

Performance Measures
Specific quantitative measures of work performed within a program (e.g. miles of streets cleaned). Also, specific quantitative measures of results obtained through a program (e.g., percent change in response time compared to previous year).

Prepaid
Expense paid in advance, such as a one-year insurance policy paid when purchased or rent paid in advance of the period covered.

Prior Year
The fiscal year preceding the current year.

Projection
Estimate of future performance made by economists, corporate planners and credit and securities analysts, typically using historic trends and other assumed input.

Redevelopment Fund
The elimination of redevelopment agencies has precluded the future financing of projects; therefore, prior funding reported will represent contractual agreements funded prior to the redevelopment dissolution.

Funds previously contributed by the Brentwood Redevelopment Agency were for projects within, or of benefit to, a redevelopment project area.

Resolution
In general, expression of desire or intent. Legal order by a government entity.

Revenues
Funds, received from various sources and treated as income to the City, which are used to finance expenditures. Examples are tax payments, fees for services, receipts from other governments, fines, grants, licenses, permits, shared revenue and interest income.

Right-of-Way
Is a public designation for space needed to accommodate streets, public utilities and other public facilities.

Special District
A designated geographic area established to provide a specialized service (e.g., Landscape Maintenance District).

Total Cost
Costs including all ancillary costs. For example, the total cost of a project would include the direct costs and indirect costs.
146
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 210 of 1460 ends

Appendix
Transient Occupancy Tax
This tax is collected from the operators of hotels and motels located within the City. A percentage of this tax is then remitted to the City.

Unit Cost
Compare the volume of work anticipated to the items needed to complete the work and the funds required to purchase these items.

Variable
Data item that can change its value; also called a factor or an element.

Variance
Difference between actual experience and budgeted or projected experience in any financial category. 147
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 211 of 1460 ends

Appendix
GUIDE TO FUNDS – DESCRIPTION OF FUNDS
Fund Accounting System
The City uses funds to report on its financial position and the results of its operations. Fund accounting is designed to demonstrate legal compliance, and to aid financial management, by segregating transactions related to certain City functions or activities.

A fund is an accounting entity with a self-balancing set of accounts established to record the financial position and results of operations of a specific governmental activity. The City maintains the following fund types:

Governmental Fund Types
General Fund is the primary operating fund of the City and accounts for all financial resources, except those required to be accounted for in another fund.

Capital Project Funds account for financial resources segregated for the acquisition of major capital projects or facilities (other than those financed by proprietary fund types).

Debt Service Funds account for the accumulation of resources for and payment of, interest and principal on general long-term debt and related costs.

Permanent Funds account for and report resources that are restricted to the extent that only earnings, and not principal, may be used for purposes that support City programs for the benefit of the City and its citizens.

Special Revenue Funds account for the proceeds of specific revenue sources (other than special assessments, expendable trusts or capital projects) that are restricted by law or administrative action to expenditures for specified purposes.

Fiduciary Fund Types
Custodial Funds account for assets held by the City as trustee or agent for individuals, private organizations, other governmental units and/or other funds. These funds are custodial in nature (assets correspond with liabilities) and do not involve measurement of results of operations.

Private-Purpose Trust Funds account for the activities and financial position of the Successor Agency to the Brentwood Redevelopment Agency. These funds are held in a trust arrangement for the benefit of local taxing entities, including the City of Brentwood.

Other Employee Benefit Trust Fund – Corebridge Financial (“Corebridge”, formerly Variable Annuity Life Insurance Company – VALIC) includes assets and activities of the City’s single-employer deferred compensation plan held by a third-party administrator.

Proprietary Fund Types
Enterprise Funds account for operations in a manner similar to private business enterprises where the intent is that the costs (expenses, including depreciation) of providing goods or services to the general public on a continuing basis is to be financed or recovered primarily through user charges.

Internal Service Funds account for the financing of goods or services provided by one department or agency to other departments or agencies of the City or to other governmental units on a costreimbursement basis. 148
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 212 of 1460 ends

Appendix
The following is a guide to current City funds by fund number. 100 General Fund – The government’s primary operating fund. It accounts for all financial resources of the general government, except those required to be accounted for in another fund. 203 Gas Tax – This fund accounts for monies received from the State of California under Street and Highways Code Section 2105. The allocations must be spent for street maintenance, construction and a limited amount for engineering.
205 Gas Tax – This fund accounts for monies received from the State of California under Street and Highways Code Section 2106. The allocations must be spent for street maintenance, construction and a limited amount for engineering.
206 Gas Tax – This fund accounts for monies received from the State of California under Street and Highways Code Section 2107. The allocations must be spent for street maintenance, construction and a limited amount for engineering.
207 Gas Tax – This fund accounts for monies received from the State of California under Street and Highways Code Section 2107.5. The allocations must be spent for street maintenance, construction and a limited amount for engineering.
208 Gas Tax – This fund accounts for monies received from the State of California under Street and Highways Code Section 2103. The allocations must be spent for street maintenance, construction and a limited amount for engineering.
209 Gas Tax – This fund accounts for monies received from the State of California under Street and Highways Code Section 2032. The allocations must be spent for street maintenance, construction and a limited amount for engineering.
214 SB1186 Disability Access – This fund accounts for monies received due to Senate Bill 1186 (SB1186), which requires cities to collect a $4 fee for new and renewed business licenses for purposes of increasing compliance with state disability laws. 216 Police Grants – This fund accounts for all Police, Federal, State and County grants awarded to the Police Department requiring segregated fund accounting. 217 Grants – This fund accounts for miscellaneous Federal, State and County grants requiring segregated fund accounting.
219 Economic Development Grant – This fund accounts for the set aside of 20% of business license tax collected. The monies are used to award grants to promote economic activity. 230 Citywide Park Assessment District – This fund accounts for special benefit assessments levied on property owners for citywide park maintenance.
149
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 213 of 1460 ends

Appendix
231 Community Facilities District #2 – This fund accounts for public safety services; acquisitions and maintenance of open space; clean water maintenance and construction and maintenance of flood and storm drain facilities.
232 Community Facilities District #3 – This fund accounts for public safety services; acquisitions and maintenance of open space; clean water maintenance and construction and maintenance of jointuse school facilities. 233 Community Facilities District #4 (Services) – This fund accounts for public safety services; maintenance of open space; clean water maintenance; maintenance of joint-use school facilities; roadway rehabilitation and under grounding of overhead utilities. 234 Community Facilities District #5 – This fund accounts for acquisition, construction and maintenance of flood and storm drainage facilities; public safety services; construction and maintenance of joint-use school facilities; rehabilitation/expansion of library sites; government facilities and community facilities and roadway rehabilitation and utility undergrounding. 235 Community Facilities District #4 (Facilities) – This fund accounts for acquisition, construction of flood and storm drainage facilities; construction of joint-use school facilities; rehabilitation/expansion of library sites; government facilities and community facilities. 250 Water Development Impact Fee – This fund accounts for development fees collected for the design and construction of water facilities within the City. 251 Roadway Development Impact Fee – This fund accounts for development fees collected for the design and construction of roadways within the City.
252 Parks and Trails Development Impact Fee – This fund accounts for development fees collected for the design and construction of parks within the City. 255 Wastewater Development Impact Fee – This fund accounts for development fees collected for the design and construction of wastewater facilities within the City. 256 Community Facilities Development Impact Fee – This fund accounts for development fees collected for the design and construction of public facilities within the City. 261 Development Impact Fee Administration – This fund accounts for development fees collected for the administration of the Development Impact Fee Program. 262 Agriculture Land Administration – This fund accounts for 20% of the Agriculture Preservation fees collected from development. Monies are to be used for administrative purposes associated with establishing, monitoring and managing farmland conservation easements. 263 Agriculture Land Acquisition – This fund accounts for 80% of the Agriculture Preservation fees collected from development. The monies are used for farmland mitigation purposes. 150
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 214 of 1460 ends

Appendix
264 First-Time Homebuyer – This fund accounts for affordable housing funds used to provide loans to first-time homebuyers who qualify as moderate to very-low income households. 265 Affordable Housing In-Lieu Fee – This fund accounts for development fees collected for affordable housing. The monies are used to ensure 10% of all new dwellings are affordable for low and very low income households.
267 Public Art Administration – This fund accounts for 20% of the Public Art fees collected from development and shall be specifically designated for community education programs, publicity, dedications and administration of the public art program. 268 Public Art Acquisition – This fund accounts for 80% of the Public Art fees collected from development and shall be utilized for all costs related to selection, acquisition, placement, installation, display and maintenance of artwork.
269 Parking In-Lieu – This fund accounts for development fees collected for off-street parking facilities located within the Downtown area.
272 Riparian Mitigation – This fund accounts for a stewardship endowment for maintenance of a riparian mitigation site.
280 Asset Forfeiture – This fund accounts for property or funds seized by the Police Department.

After a case has been tried and a guilty verdict is returned, the funds are considered forfeited.

Federal funds must be used for narcotic enforcement and crime suppression. State funds must be used for areas related to drug prevention.
281 Abandoned Vehicle Abatement – This fund accounts for monies which can only be used for the abatement, removal and disposal, as public nuisances, of any abandoned, wrecked, dismantled or inoperative vehicles, or parts thereof, from private or public property. 285 PEG Media – This fund accounts for public, educational and governmental access fees collected from cable operators established per the Municipal Code and franchise agreements. This fund accounts for Public Access, Educational and Governmental (PEG) television channels provided for the citizens of Brentwood.
286 Parks Advertising – This fund accounts for Parks and Recreation advertising fees collected to publish and distribute the Parks and Recreation Activities guide, as well as, enhance the amenities at the Sunset Athletic Complex, the Brentwood Family Aquatic Complex and the Brentwood Skate Park.
293 Measure J – This fund accounts for the local jurisdiction portions of the Measure J – Contra Costa County sales tax allocated for Local Street Maintenance and Improvements. These monies can only be spent on local streets and roads, transit operations, growth management planning and compliance, bicycle and pedestrian trails and parking facilities. 151
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 215 of 1460 ends

Appendix
302 City Low Income Housing – This fund accounts for the activities related to the assets assumed by the City of Brentwood as Housing Successor for the housing activities of the former Brentwood Redevelopment Agency.
336 Roadway Improvements – This fund accounts for transactions related to proceeds from assessment bonds and other resources and their use to acquire and construct certain roadway improvements.
337 Community Facilities Improvements – This fund accounts for various community facilities improvement projects associated with either the construction or improvement of the City’s community facilities.
352 Parks and Trails Improvements – This fund accounts for various park and trail improvement projects associated with either the construction or improvement of the City’s parks. 361 Civic Center Project Lease Revenue Bond Acquisition – This fund accounts for transactions related to proceeds from the 2009 Civic Center Bonds and other resources and their use to acquire and construct certain capital facilities and infrastructure. 366 2015 Lease Financing – This fund accounts for transactions related to proceeds from the 2015 Lease Financing and their use to acquire and construct certain capital facilities and infrastructure. 380 Civic Center Capital Improvement Financing Program – This fund accounts for savings from refinanced bonds and their use to finance a portion of the Civic Center project. 381 City Capital Improvement Financing Program – This fund accounts for savings from refinanced bonds and their use to acquire and construct certain capital facilities and infrastructure.
392 Capital Infrastructure – This fund accounts for funds to be used for non-residential development related infrastructure projects with a focus on non-residential projects that may promote economic development.
393 Vineyards Projects – This fund accounts for transactions related to proceeds from assessment bonds and other resources and their use to finance infrastructure improvements within the Vineyards development area.
435 2018 A Refinance Debt Service – This fund accounts for CIFP tax assessment receipt and debt service payments of CIFP Infrastructure Revenue Bonds.
436 2014 A & B Refinance Debt Service – This fund accounts for CIFP tax assessment receipt and debt service payments of CIFP Infrastructure Revenue Bonds. 437 2012 A Refinance Debt Service – This fund accounts for CIFP tax assessments receipts and debt service payments of CIFP Infrastructure Revenue Bonds.
152
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 216 of 1460 ends

Appendix
438 Capital Improvement Financing Program 2003-1 Debt Service – This fund accounts for CIFP tax assessment receipts and debt service payments on CIFP Infrastructure Revenue Bonds. 439 Capital Improvement Financing Program 2002-1 Debt Service – This fund accounts for CIFP tax assessments receipts and debt service payments of CIFP Infrastructure Revenue Bonds. 441 Capital Improvement Financing Program 94-1 Debt Service – This fund accounts for CIFP tax assessment receipts and debt service payments on CIFP Infrastructure Revenue Bonds. 442 Capital Improvement Financing Program 98-1 Debt Service – This fund accounts for CIFP tax assessments receipts and debt service payments on CIFP Infrastructure Revenue Bonds. 443 Capital Improvement Financing Program 99-1 Debt Service – This fund accounts for CIFP tax assessments receipts and debt service payments on CIFP Infrastructure Revenue Bonds. 444 Capital Improvement Financing Program 2000-01 Debt Service – This fund accounts for CIFP tax assessment receipt and debt service payments on CIFP Infrastructure Revenue Bonds. 445 Capital Improvement Revenue Refunding Bonds Series 2021 A & B Debt Service – This fund accounts for debt service transactions related to the refinance of the 2012 Capital Improvement Revenue Refunding Bonds.
448 General Obligation Bonds Series 2002 Debt Service – This fund accounts for tax levies from which general obligation debt service transactions are made on the General Obligation Bond Series 2002. This bond was used to finance the Police Station. 449 Capital Improvement Financing Program 2004-1 Debt Service – This fund accounts for CIFP Tax assessment receipts and debt service payments on CIFP Infrastructure Revenue Bonds. 460 Randy Way Assessment District Debt Service – This fund accounts for Randy Way tax assessment receipts and debt service payments of CIFP Infrastructure Revenue Bonds. 461 2019 Civic Center Project Lease Revenue Refunding Bonds Debt Service – This fund accounts for debt service transactions relating to the 2009 Civic Center Project Lease Revenue Bonds. 463 Capital Improvement Financing Program 2006-1 Debt Service – This fund accounts for CIFP tax assessment receipt and debt service payments of CIFP Infrastructure Revenue Bonds. 464 Capital Improvement Financing Program 2005-1 Debt Service – This fund accounts for CIFP Tax assessments receipts and debt service payments on CIFP Infrastructure Revenue Bonds. 466 2015 Lease Financing Debt Service – This fund accounts for debt service transactions related to the 2015 Lease Financing.
510 Housing Enterprise – This fund accounts for the administration of the Housing Enterprise which includes the Housing rental units, Affordable Housing and the First-Time Homebuyers program. 153
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 217 of 1460 ends

Appendix
511 Housing Rental Trust – This fund accounts for the operation and maintenance of the Housing rental units.
513 Housing Replacement – This fund accounts for revenues and expenditures associated with the replacement of housing rental capital assets and infrastructure. 540 Solid Waste Enterprise – This fund accounts for the operation, maintenance and capital costs of the solid waste system. These activities are funded by user charges. 542 Solid Waste Improvements – This fund accounts for expenditures associated with solid waste capital improvement projects.
543 Solid Waste Replacement – This fund accounts for revenues and expenditures associated with the replacements of solid waste capital assets and infrastructure. 560 Water Enterprise – This fund accounts for the operation, maintenance and capital costs of the water system. These activities are funded by user charges. 562 Water Improvements – This fund accounts for expenditures associated with water capital improvement projects.
563 Water Replacement – This fund accounts for revenues and expenditures associated with the replacements of water capital assets and infrastructures. 590 Wastewater Enterprise – This fund accounts for the operation, maintenance and capital costs of the wastewater system. These activities are funded by user charges. 592 Wastewater Improvements – This fund accounts for expenditures associated with wastewater capital improvement projects.
593 Wastewater Replacement – This fund accounts for revenues and expenditures associated with the replacements of wastewater capital assets and infrastructures. 6XX Landscape and Lighting Assessment Districts – These funds account for special benefit assessments levied on property owners for landscape and street lighting maintenance. 701 Information Systems – To provide a source of funding for the development and coordination of the City’s information system’s needs.
702 Vehicle and Equipment Replacement – To provide a source of funding for vehicle and equipment replacement.
703 Information Systems Replacement – To provide a source of funding for the replacement of information systems such as computers and the phone system. 154
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 218 of 1460 ends

Appendix
704 Facilities Replacement – To provide a source of funding for repairs or the replacement of City facilities.
705 Tuition – To provide a source of funding for expenditures related to continuing education. 706 Fleet Maintenance Services – To provide a source of funding for the maintenance of all City vehicles, except for Police Department vehicles.
707 Facilities Maintenance Services – To provide a source of funding for maintenance and repairs of City facilities.
708 Parks and LLAD Replacement – To provide a source of funding for the replacement of landscaping, equipment and facilities in the citywide parks and Landscape and Lighting Assessment Districts (LLAD).
709 Insurance – To provide a source of funding for future insurance costs and unforeseen expenses due to legal matters or lawsuits.
710 Pension/Other Post-Employment Benefits (OPEB) Obligation – To provide an intermediateterm funding source for OPEB and pension expenses. 155
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 219 of 1460 ends

Project Title Page # Project # Total Cost Category
Aquatic Complex Locker Rooms Remodeling 60 52454 $ 466,590 Parks and Trails Improvements Aquatic Complex Mechanical Room Improvements 61 52434 495,000 Parks and Trails Improvements Aquatic Complex Slides & Stair Replacement 62 500,000 Parks and Trails Improvements Aquatic Complex Water Play Structure Replacement 63 386,250 Parks and Trails Improvements Balfour Road – Sanitary Sewer Rehabilitation 97 59208 1,850,000 Wastewater Improvements Basketball Court Lighting – Homecoming & Windsor Parks 64 52453 723,000 Parks and Trails Improvements Brentwood Boulevard – Sanitary Sewer Rehabilitation 98 59209 4,050,000 Wastewater Improvements Brentwood Boulevard Widening North - Phase I 46 31620 10,196,085 Roadway Improvements Brentwood Manor Water and Wastewater Rehabilitation 82 56419 6,487,000 Water Improvements Canal Replacement Cost Share - Segment 5 83 56420 5,897,000 Water Improvements Citywide Access Control System Upgrade 112 37260 1,475,600 Community Facilities Improvements Citywide Non-Potable Water Distribution System 99 59202 9,407,828 Wastewater Improvements Collection System Improvements 101 59206 500,000 Wastewater Improvements Comprehensive General Plan Update 113 37264 1,350,000 Community Facilities Improvements Corporation Yard Security Improvements 114 300,000 Community Facilities Improvements Countywide Smart Signals 48 31706 1,991,603 Roadway Improvements Downtown Alley Rehabilitation - Helen Myers Way and Park Way 84 56414 6,150,000 Water Improvements Downtown Public WiFi Upgrade 115 37261 291,770 Community Facilities Improvements Fleet Electrification 116 37265 3,293,909 Community Facilities Improvements Highland Way Wastewater Upgrade 102 1,750,000 Wastewater Improvements Housing Element Update – 7th Cycle 118 675,000 Community Facilities Improvements Hydrodynamic Separator at Marsh Creek 119 100,000 Community Facilities Improvements Innovation Center @ Brentwood Infrastructure 49 31695 7,912,000 Roadway Improvements Irrigation Controllers 65 52451 923,988 Parks and Trails Improvements Lone Tree Way - Union Pacific At-Grade Crossing 51 31340 24,722,000 Roadway Improvements Lone Tree Way Roadway Improvements 52 31701 17,693,336 Roadway Improvements On-Site Chlorine Generation System Upgrade 85 56408 2,000,000 Water Improvements Pavement Management Program - 2026 53 31705 3,010,596 Roadway Improvements Pavement Management Program - 2027 54 3,146,914 Roadway Improvements Pavement Management Program - Future 55 13,273,121 Roadway Improvements Playground Replacement - Caboose Park 66 258,000 Parks and Trails Improvements Playground Replacement - City Park 67 500,000 Parks and Trails Improvements Playground Replacement - Lake Park 68 258,000 Parks and Trails Improvements Playground Replacement - Miwok Park 69 52448 500,000 Parks and Trails Improvements Playground Replacement - Oak Meadow Park 70 52445 395,000 Parks and Trails Improvements Playground Replacement - Sage Glen Park 71 500,000 Parks and Trails Improvements Playground Replacement - Walnut Park 72 500,000 Parks and Trails Improvements Public Art Spaces 120 37244 786,383 Community Facilities Improvements Pump Station 2.4 Installation 86 56415 4,350,000 Water Improvements Sand Creek Sports Complex 73 52446 24,163,172 Parks and Trails Improvements Sludge Collector Equipment Replacement 87 1,981,000 Water Improvements Solid Waste Carts Upgrade 121 54022 1,700,000 Community Facilities Improvements Solid Waste Transfer Station Updates 122 2,100,000 Community Facilities Improvements Soundwall - Fairview Avenue and Balfour Road 123 3,246,000 Community Facilities Improvements Sunset Field Natural Turf Improvement 74 52432 384,000 Parks and Trails Improvements Trail Pavement Management - 2026 75 52457 150,000 Parks and Trails Improvements Trail Pavement Management - 2027 76 150,000 Parks and Trails Improvements Trail Pavement Management - Future 77 600,000 Parks and Trails Improvements Underground Water System Corrosion Mitigation 88 56320 469,216 Water Improvements Valve Actuator and Control System Upgrade 89 56422 2,040,000 Water Improvements Vineyards at Marsh Creek – Theater/Event Center/Amphitheater Phase I 124 37231 10,200,000 Community Facilities Improvements Wastewater Treatment Plant Expansion - Phase II 103 59140 123,635,000 Wastewater Improvements Wastewater Treatment Plant Headworks Rehabilitation 104 59210 2,900,000 Wastewater Improvements Wastewater Treatment Plant Secondary Clarifier Replacement 105 3,880,000 Wastewater Improvements Wastewater Treatment Plant Tertiary Filter Expansion 106 4,200,000 Wastewater Improvements Water and Wastewater Laboratory 107 59207 5,000,000 Wastewater Improvements Water Line Improvement - Pearson Drive/Foothill Drive 90 56417 970,000 Water Improvements Water Operations Storage Building 91 56423 1,000,000 Water Improvements Zone 2 Reduced Water Pressure Zone 92 56411 1,400,000 Water Improvements Zoning Ordinance Comprehensive Update 125 450,000 Community Facilities Improvements Total City Projects (Includes Prior and Future Costs) $ 329,684,361 Index By Project Title (Alphabetical)
156
City of Brentwood 2026/27 – 2030/31 Capital Improvement Program

Page 220 of 1460 ends

City of Brentwood
150 City Park Way | Brentwood, CA 94513
www.brentwoodca.gov

Page 221 of 1460 ends

RESOLUTION NO. 2026-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
BRENTWOOD: ADOPTING THE 2026/27–2030/31 CAPITAL

IMPROVEMENT PROGRAM (CIP)
WHEREAS, Government Code Section 65400, et seq., provide that, after adoption of all or part of a general plan, the City is to identify reasonable and practical means for implementing the General Plan so that it serves as an effective guide for orderly growth and development, preservation and conservation of open-space land and natural resources, and the efficient expenditure of public funds relating to subjects addressed in the General Plan; and
WHEREAS, Government Code section 65401 requires proposed public works recommended for planning, initiation, or construction during the ensuing fiscal year to be submitted for review and report as to conformity with the adopted General Plan; and
WHEREAS, the City of Brentwood adopted the most recent General Plan Update in July 2014, which states the City may include General Plan items in the Capital Improvement Program (CIP) as the City deems appropriate; and WHEREAS, General Plan policy requires inclusion of certain capital projects sponsored by the City and necessary to achieve General Plan action items in the fiveyear CIP; and WHEREAS, the purpose of the CIP is to integrate capital planning with the General Plan and other City activities, and to ensure that planning for capital improvements is tied to realistic funding sources; and
WHEREAS, this CIP includes projects that have been carefully evaluated to ensure: (1) the City’s capital improvement needs are met, both now and in the future (2) the projects support the City’s Mission Statement, General Plan, and most recent City of Brentwood Strategic Plan, and (3) available funding sources are identified; and
WHEREAS, it is necessary to define improvements and anticipated construction schedules to ensure proper pre-planning, design and community review before construction begins; and
WHEREAS, on March 17, 2026, City Finance staff met with the Budget and Debt Management Ad Hoc Committee and reviewed a preliminary draft of the 2026/27 – 2030/31 CIP; and
WHEREAS, on April 14, 2026, the proposed 2026/27 – 2030/31 CIP was presented to the City Council at the CIP Workshop and the draft CIP was updated to incorporate Council direction from that workshop; and

Page 222 of 1460 ends
Page 2 of 2 ends

WHEREAS, on May 5, 2026, the Planning Commission reviewed the proposed 2026/27–2030/31 CIP and determined that it is consistent with the City’s General Plan; and
WHEREAS, beginning May 15, 2026, a copy of the draft 2026/27–2030/31 CIP was made available for public review on the City’s website; and WHEREAS, adoption of the 2026/27–2030/31 CIP establishes the City’s capital improvement plan for the five-year period, but does not independently authorize any project-specific construction contract, final project approval, or futureyear appropriation that otherwise requires separate City Council action.

NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Brentwood hereby adopts the 2026/27 – 2030/31 Capital Improvement Program as presented in Exhibit “A”, including roadway, parks and trails, water, wastewater, and community facilities improvements to be constructed during the next five years.

BE IT FURTHER RESOLVED that appropriations, transfers, and other budgetary actions necessary to implement the 2026/27–2030/31 CIP shall be included in the applicable City budget or otherwise presented to the City Council for approval as required.

PASSED, APPROVED, AND ADOPTED by the City Council of the City of Brentwood at a regular meeting held on the 26th day of May 2026 by the following vote:

Page 223 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
SUBJECT: Approve amendments to the Brentwood Municipal Code related to the adoption of Objective Design Standards for Residential and Mixed-Use Development needed to comply with State law as required by the City’s adopted Housing Element implementation policies
DEPARTMENT: Community Development
STAFF: Alexis Morris, Director of Community Development Erik Nolthenius, Planning Manager
Jennifer Hagen, Principal Planner

TITLE/RECOMMENDATION
Introduce and waive first reading of an Ordinance approving text amendments (RZ 25-001) to the Brentwood Municipal Code related to the adoption of Objective Design Standards for Residential and Mixed-Use Development including adding Chapter

17.825 - Objective Design Standards and Chapter 17.815 - By-Right Approval Process as well as other updates throughout the Municipal Code needed to comply with State law as required by the City’s Housing Element.

The text amendments are exempt from the California Environmental Quality Act (CEQA), pursuant to Public Resources Code Section 21065, CEQA Guidelines Sections 15060(c)(2), 15378, and 15061(b)(3), as it can be seen with certainty that there is no possibility that they may have a significant effect on the environment.

FISCAL IMPACT
Adoption of the proposed ordinance will not result in a fiscal impact, as staff will continue to process appropriate planning applications through designated review processes, which include the collection of fees for the cost of these processes, in accordance with the City’s Cost Allocation Plan.

BACKGROUND

RELEVANT STATE LAWS
The intent of Objective Design Standards (ODS) is to address recent changes in state law that seek to streamline and increase housing production, by making approval

Page 224 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
processes more routine and predictable. A key component of several of these new laws is increased limitations on discretionary review processes, placing a greater emphasis on objective design and development standards as the primary criteria for project approval or denial. Relevant laws include those adopted as part of the 2017 "housing package" (a series of 15 separate pieces of legislation), including SB 35 (Wiener), which allows "by right" approval of certain housing projects, followed by more recently passed legislation, notably SB 330 (Skinner) (extended by SB 8), the Housing Crisis Act.

SB 330 placed additional limitations on project review and the application of objective design standards to all multi-family residential units, not just those that are affordable, to further encourage housing production. Specifically, SB 330 amended the Housing Accountability Act to clarify, among other things, that design review must be objective and “strictly focused on assessing compliance with criteria required for streamlined projects, as well as any reasonable objective design standards” (i.e., non-subjective) (Government Code § 65913.4(d)(1)). As defined by State law, objective design standards “involve no personal or subjective judgment by a public official and are uniformly verifiable by reference to an external and uniform benchmark or criterion available and knowable by both the applicant or development proponent and the public official prior to submittal, and includes only such standards as are published and adopted by ordinance or resolution by a local jurisdiction before submission of a development application.” SB 330 also prohibits cities from adopting new standards or enforcing standards established on or after January 1, 2020, that are not objective.

It is important to note that under these legislative changes, the role of design review bodies in cities will be required to evolve with the introduction and implementation of objective design standards. For example, there will be instances where the City will be limited in its ability to apply subjective design standards and conditions of approval. Thus, it is important for the City to prepare and adopt appropriate objective standards to continue to implement its design review goals where discretionary review is limited.

With these new laws and procedures in place, and expecting the emphasis on objective standards to continue in future legislation, it is in the City’s interest to have a robust group of residential design and development standards (i.e., objective design standards) in place, to ensure that projects deliver high-quality design, appropriate site planning, and amenities, and are compatible with surrounding neighborhoods and the community.

Page 225 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026

CITY COUNCIL DIRECTION
On January 24, 2023, the City Council provided direction on reinitiating the City’s Zoning Code Update, including the creation of objective design standards for new residential development. The current Residential Design Guidelines (adopted by the City in 2006) articulate the importance of high-quality design that complements and enhances the existing fabric of the community. The 2006 guidelines expressed the community’s desires and ensured that new residential development respected the past, while embracing the future and welcoming new residents. However, many of the current guidelines are subjective relative to the review of new development.

On June 27, 2023, the City Council unanimously adopted Interim Urgency Ordinance No. 1059, implementing Interim Objective Design Standards for residential housing projects. On December 12, 2023, the City Council held a Special Meeting to discuss and provide direction on initial goals and objectives for a comprehensive set of Objective Design Standards for Residential and Mixed-Use Development (ODS), as well as to provide direction on the format of the document itself. Since then, staff held a community meeting on March 27, 2024, and conducted an architectural preference survey that was advertised on social media and City feeds. Based on the City Council’s direction, De Novo Planning Group and JZMK Partners, in collaboration with City staff (collectively referred to as the project team), have prepared the first draft of the ODS that will replace the current interim standards.

On May 19, 2025, staff presented an introduction of the Draft ODS to the Land Use and Development Committee and invited the community to provide comments to the City. This coincided with the introduction of an initial public comment period that was advertised on social media and City feeds. In addition, staff updated the City’s website to include the initial Draft ODS, as well as the 2006 Residential Design Guidelines for reference. Since the publication of the Draft ODS on May 16, 2025, staff has not received any comments.

PLANNING COMMISSION MEETING OF SEPTEMBER 16, 2025
On September 16, 2025, the Planning Commission considered the proposed amendments to the Brentwood Municipal Code related to the Draft ODS. During the meeting, the Planning Commission discussed several potential recommended changes to the document. After discussion, the Planning Commission continued the item to October 21, 2025 to allow additional time to review the proposed ODS.

Page 226 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
PLANNING COMMISSION MEETING OF OCTOBER 21, 2025
On October 21, 2025, the Planning Commission again considered the proposed amendments to the Brentwood Municipal Code related to the Draft ODS. During the meeting, the Planning Commission discussed several potential recommended changes to the document. After discussion, the Planning Commission requested that the changes discussed be incorporated into the document and be brought back again to the Planning Commission for review prior to moving the item forward to the City Council.

PLANNING COMMISSION MEETING OF MARCH 17, 2026
On March 17, 2026, the Planning Commission again considered the proposed amendments to the Brentwood Municipal Code related to the Draft ODS that had been revised based on direction provided on October 21, 2025. Specific direction related to roof materials, contemporary architecture, increased objectivity, and miscellaneous recommended changes throughout the guidelines were incorporated prior to the final review. A full discussion and a complete summary table of the requested changes by the Planning Commission and how each of the items are addressed, can be found within the March 17th agenda report. At the conclusion of the hearing, the Planning Commission was supportive of the revised ODS draft and text amendments. The Planning Commission unanimously adopted Resolution No. 25-015, recommending that the City Council approve the amendments as presented in the agenda report with minor, non-substantive changes. The Zoning Code amendments related to the Objective Design Standards and statutory requirements are included in Attachments 3, 4, and 5, and the Draft Objective Design Standards are included as Attachment 6, Exhibit D.

PROJECT DESCRIPTION AND ANALYSIS
The City Council initiated amendments to the Zoning Ordinance to implement new residential objective design standards and to provide effective implementation of the Housing Element. The proposed text amendments to the Brentwood Municipal Code are needed to comply with state law as required by the City’s Housing Element Implementation Program Action H.1g: Residential Design Guidelines.

Action H.1g: Residential Design Guidelines
Continue implementation of the City’s approved Residential Design Guidelines and encourage a variety of housing types to continue to provide safe, sound, and attractive for units all residents. The intent of these guidelines is to express

Page 227 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
the housing design features the City would like to encourage in order to improve certainty and to minimize the processing time for design review applications. The City will also review the Residential Design Guidelines for subjective language and adopt modifications to promote objectivity – as of January 24, 2023, the City Council has approved to create objective standards for all residential uses by the end of 2023.

Based on preliminary City Council direction, as well as Planning Commission direction provided on October 21, 2025, the City prepared the attached revised draft of the Residential Objective Design Standards (March 2026) included in Attachment 6. In addition, staff has created an extended and linked Table of Contents within Attachment 7 that may assist in reviewing and navigating the document more efficiently. The Draft ODS provides a basis for review and approval of residential projects based on objective, measurable, and verifiable design criteria that seek to ensure new residential development is attractive, compatible, appropriately scaled, and visually harmonious with existing neighborhoods and environments within Brentwood.

As part of the process of drafting the initial ODS, the project team used the current 2006 Residential Design Guidelines as inspiration for the future standards to continue to respect the past while embracing the future of Brentwood. This included going line by line through the existing guidelines, comparing the current goals and carrying over the best practices and guidelines into new objective standards where applicable, and removing old and outdated criteria. A complete summary of the originally proposed ODS can be found in the September 16, 2025, October 21, 2025, and March 17, 2026 Planning Commission agenda reports for reference.

To implement the proposed ODS, various amendments throughout the Brentwood Municipal Code (BMC) are also necessary. To effectively implement the new standards, staff has drafted two new BMC Chapters (Chapter 17.825 - Objective Design Standards and Chapter 17.815 - By-Right Approval Process). In addition, staff has updated various other references through the BMC to address the new standards and their applicability. The proposed BMC amendments can be found in Exhibits A, B, and C of the attached Ordinance (Attachments 3, 4, and 5 of this report).

OBJECTIVE DESIGN STANDARDS FORMAT
Consistent with the requirements of recent and pending legislation (SB 35, SB 330, and others), the Draft ODS (included as Attachment 6, Exhibit D) are intended to provide a basis for review and approval of residential projects based on objective, measurable, and verifiable design criteria. The Draft ODS have been created to

Page 228 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
include simple and clear language, using terms that are universally understood. By way of example, a subjective design standard would be one that requires a “significant entry" on the front elevation (which is subject to interpretation), while a corresponding objective design standard would be one that includes a specific measurement, such as the entry needing to be at least 25% the width of the elevation. A specific example from the 2006 Residential Design Guidelines included guidance to “minimize privacy intrusions on adjacent residences; windows should be placed to minimize views into the living spaces and yard spaces near neighboring homes. The Draft ODS now includes specific requirements that state “within singlefamily and multi-family buildings, windows facing each other and located within 40 ft. of each other shall not directly align with one another.” The Draft ODS document is graphically rich, employing features such as simple and clear language, a picturebased format, as well as a combination of text, diagrams, and imagery.

OBJECTIVE DESIGN STANDARDS CONTENT
Each chapter within the Draft ODS starts with a Purpose subsection that outlines the high-level goals of the section through subsections that organize one or more design standards to regulate specific design guidance. The design guidance is provided for each subsection with an intent statement that outlines General Plan and other planning policies and specific intent of the standards that follow.

The Draft ODS contains six chapters:

1. Introduction.

2. Site Planning. This chapter outlines a project’s boundaries and parameters.

It establishes the project limits for the development, as all subsequent site planning concepts will be specifically applicable within the defined boundary area.

3. Site Design. This chapter outlines a project’s shared and private open spaces that serve multiple purposes, encourage gathering, improve the health and wellness of residents and embraces nature in the built environment. In addition, the chapter establishes objectives related to building orientation, site access and utilities to ensure quality design and site layouts that increase pedestrian comfort and safety.

4. Building Design. This chapter provides objectives to help mediate the scale, massing, and bulk of buildings within a project to reflect a human scale,

Page 229 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
enhance the pedestrian experience and respond to a building’s context through refined building massing and façade articulation.

5. Architectural Styles. This chapter establishes architectural styles that are intended to establish a strong, consistent design image and direction for the City of Brentwood. All styles reflect the desires, aspirations, and vision of the City. Based on Planning Commission recommendations, Contemporary Architecture has been removed from the guidelines. The architectural styles discussed include the following:
 Spanish
 Mediterranean
 Ranch
 Craftsman
 Queen Anne
 Colonial
 Italianate

6. Landscape. This chapter establishes objectives that emphasize landscaping as a fundamental design component, retaining mature landscaping to the extent appropriate, to reinforce a sense of the natural environment and to maintain an established appearance. It also assists in establishing landscape clearances and other design elements to buffer residential units to the extent possible from the impacts of abutting roadway or different intensities of land uses and fire hazard areas.

RECOMMENDED AMENDMENT
After the conclusion of the Planning Commission hearing and the completion of the March 2026 Draft ODS that is currently posted on the City’s website, City staff identified one additional area that could provide additional objectivity related to undergrounding of utilities. As currently written, the City’s municipal code section relating to undergrounding of utilities and appurtenances may be interpreted to only apply to conduits and not transformers. It is the City’s intent to require underground transformers on all residential lots. To clarify this through the ODS, staff is recommending the following chapter be added to the final ODS:

2.6 Single Family Subdivisions

2.6.4 Electric Transformers
Pad-mounted electric transformers are prohibited within the front yard setback area of any residential lot or within any lot, parcel, or other area within a

Page 230 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026
single-family residential subdivision, including, but not limited to, any residential lot, common area, landscape parcel, bioretention area, stormwater treatment area, open space parcel, park parcel, or other subdivision parcel.

Any electric transformers required within these areas shall be installed subsurface.

PROCESS MOVING FORWARD
Once the ODS are adopted, they will be used to evaluate all new residential and mixed-use applications that are submitted. Based on the requirements of State law, many of those applications will be for design review only, wherein the Planning Commission or City Council will not have the discretion that it has had in the past.

Rather, the ODS will be a tool utilized by staff and architectural peer review consultants to ensure that applications are consistent with the guidelines, while the Planning Commission’s review will be very limited and primarily to confirm conformance with the ODS. The ODS are intentionally very detailed because they are meant to be used by architects and practitioners, etc., however they were thoughtfully crafted to be easily understood.

CONCLUSION
Staff is requesting that the City Council review and approve the Draft ODS including adding 2.6.4 Electric Transformers, and supplemental Code amendments. If necessary, the City Council may provide additional recommended changes to the Draft ODS. This is the culmination of a two-year plus work effort, and staff recognizes that the Draft ODS is a lengthy and complex document that requires time for the City Council to review and therefore provided the City Council with draft document three weeks prior to meeting to review in order to allow for the City Council to deliberate, and provide comments.

CITY COUNCIL STRATEGIC INITIATIVE
Focus Area 4: Community Development
Implement Zoning Ordinance update to maintain compliance with State law, including developing objective design standards (SB 330 compliance)

PREVIOUS ACTION
Previous action by the City Council is included in Attachment 1.

Page 231 of 1460 ends

CITY COUNCIL AGENDA ITEM NO. G.2
05/26/2026

DATE OF NOTICE
The City of Brentwood published a public hearing notice in the Brentwood Press on May 15, 2026.

ENVIRONMENTAL DETERMINATION
Pursuant to the California Environmental Quality Act (CEQA), Public Resources Code §§ 21000, et seq., as amended and implementing State CEQA Guidelines, 14 CCR §§ 15000, et seq. (collectively “CEQA”), the adoption of the Ordinance implementing the objective design standards and the Objective Design Standards for Residential and Mixed-Use Development (“the Ordinance”) does not constitute a “project” within the meaning of Public Resources Code Section 21065, or 14 CCR §§ 15060(c)(2) or 15378 because it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment. Even if the adoption of the Ordinance did constitute a project under CEQA, the objective design standards documents fall within the “common sense” exemption set forth in 14 CCR § 15061(b)(3), exempting projects from CEQA where “it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment…” The Ordinance does not authorize new development or increase the density or intensity of uses otherwise permitted.

Therefore, the Ordinance is not subject to further CEQA review.

ALTERNATIVE OPTION(S)
The following are alternative options that the City Council may consider:

1. Direct staff to make additional changes to the proposed amendments and return with revised ordinances.

2. Decline to adopt the proposed amendments and ODS at this time. Note that the Interim ODS will remain in effect until such time as new standards are adopted that would supersede the Interim Standards.

ATTACHMENT(S)

1. Previous Actions

2. Draft Ordinance

3. Exhibit A – Chapter 17.825 (Objective Design Standards)

4. Exhibit B – Chapter 17.815 (By-Right Approval Process)

5. Exhibit C – Miscellaneous BMC Amendments

6. Exhibit D – Draft Objective Design Standards for Residential and Mixed-Use Development

7. Linked Table of Contents

Page 232 of 1460 ends

PREVIOUS ACTION
Previous actions related to this agenda item that were taken by the Council are listed below. To view prior actions and materials, and Brentwood Municipal Code references in the staff report, as applicable:
 Visit www.brentwoodca.gov/meetings, and select the meeting date(s) desired to see the reference materials and videos.
 Visit www.brentwoodca.gov/municipalcode to research references to the Brentwood Municipal Code and search by the code section(s) cited.

On November 16 and 17, 2017, the City Council held workshops to discuss, deliberate, and direct staff on priorities and the allocation of financial resources for the development of a Strategic Plan initiative. The Council directed staff to initiate a comprehensive zoning ordinance update.

On February 27, 2018, the City Council adopted Resolution No. 2018-21 to approve the FY 2018/19 and FY 2019/20 City of Brentwood Strategic Plan, including Strategic Initiative 4.1.c, preparation of a comprehensive zoning ordinance update which has been continued over the past few years into the current Strategic Plan FY 2022/23 – FY 2023/24 (Focus Area 4: Land Use Planning, Goal 1: Implement Zoning Ordinance update).

On June 9, 2020, by Resolution No. 2020-73, the City Council adopted the City’s 2020/21 – 2024/25 Capital Improvement Program (“CIP”), which includes the Zoning Ordinance Update, CIP Project No. 337-37228.

On January 24, 2023, the City Council provided direction on reinitiating the City’s Zoning Code Update, including a new focused and phased approach that is to be scaled down in size and focused into specific tasks.

On May 23, 2023, the City Council approved a Professional Services Agreement with De Novo Planning Group to prepare and complete the Focused Zoning Ordinance Update and Objective Design Standards.

On December 9, 2025, the City Council approved an amendment to extend the Professional Services Agreement with De Novo Planning Group to prepare and complete the Focused Zoning Ordinance Update and Objective Design Standards.

Page 233 of 1460 ends

ORDINANCE NO. XXXX

AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF
BRENTWOOD APPROVING A TEXT AMENDMENT (RZ 25-001) TO

AMEND THE BRENTWOOD MUNICIPAL CODE RELATING TO
OBJECTIVE DESIGN STANDARDS FOR RESIDENTIAL AND MIXEDUSE DEVELOPMENT TO COMPLY WITH STATE LAW AND IMPLEMENT THE CITY’S HOUSING ELEMENT
WHEREAS, Government Code Section 65800 et seq. provides for the adoption and amendment of zoning laws, ordinances, rules and regulations; and WHEREAS, City staff prepared a zoning text amendment (the “Ordinance”) that would adopt Objective Design Standards for Residential and Mixed-Use Development, as required by state law and the City’s Housing Element, and to establish procedures for their review; and
WHEREAS, on September 29, 2017, in an effort to address the State’s ongoing housing crisis, Governor Jerry Brown signed Senate Bill 35 into law, which amended Government Code Sections 65400 and 65582.1, and added Section 65913.4, requiring cities and counties to streamline their review and approval of eligible housing projects; and
WHEREAS, on October 9, 2019, in an effort to address the State’s ongoing housing crisis, Governor Newsom signed Senate Bill 330 into law, which amended Government Code Sections 65589.5 and 65941.1, limiting a jurisdiction’s ability to deny a housing project when it complies with all objective general plan and zoning standards; and
WHEREAS, on September 28, 2022, in an effort to address the State’s ongoing housing crisis, Governor Newsom signed Assembly Bill 2011 into law, which amended Government Code Sections 65400 and 65585, and added Sections 65912.100-101, requiring jurisdictions to subject certain multifamily housing projects in commercial districts to a ministerial, streamlined approval process if the development satisfies specified objective planning standards; and WHEREAS, on October 11, 2023, Governor Newsom signed Senate Bill 423 into law, which amended and extended the streamlined ministerial approval process established by Senate Bill 35; and
WHEREAS, the City of Brentwood has committed to amending the Brentwood Municipal Code to provide regulations for residential and mixed-use objective design standards to ensure quality, economically feasible, and sustainable design under the streamlined review and approval processes required by State law; and WHEREAS, the City has complied with the requirements of the Local Planning and Zoning Law (Government Code Sections 65100, et seq.), and the City’s

Page 234 of 1460 ends
Page 2 of 4 ends

applicable ordinances and resolutions with respect to approval of amendments to Title 17 of the Brentwood Municipal Code (“Zoning Ordinance”); and WHEREAS, in an effort to comply with State Housing Streamlining Laws, an amendment to the City’s Zoning Ordinance regulating and implementing Objective Design Standards is proposed and attached hereto as provided in Exhibits “A,” “B,” and “C” and the Brentwood Objective Design Standards for Residential and MixedUse Development are attached hereto as Exhibit “D”; and WHEREAS, State Housing Element Law (Government Code Sections 65580, et seq.) requires that the City Council adopt a Housing Element for the eight-year period 2023-2031; and
WHEREAS, on February 13, 2024, the City Council approved Resolution No. 2024-16, which amended and approved a revised 2023-2032 Housing Element (“Housing Element”); and
WHEREAS, on April 12, 2024, the State Department of Housing and Community Development (HCD) certified the Housing Element; and WHEREAS, the Housing Element included a program that required the City to review its Zoning Code and Residential Design Guidelines for subjective language and adopt modifications to promote objectivity related to the creation of objective residential design guidelines; and
WHEREAS, on September 16, 2025 and October 21, 2025, the Planning Commission conducted a duly and properly noticed public hearing to take public testimony and consider the Ordinance regarding the proposed Zoning Code amendments, the staff report and all attachments, and oral and written public comments, and continued the item; and
WHEREAS, on March 17, 2026, the Planning Commission held a duly-noticed public hearing to consider the staff report, recommendation by staff, and public testimony concerning this Ordinance. Following the public hearing, the Planning Commission found that the proposed Ordinance is consistent with the goals and policies of the General Plan and voted to recommend that the City Council adopt the proposed Ordinance by a vote of 5-0; and
WHEREAS, the City published a notice of public hearing in the Brentwood Press on May 15, 2026, in accordance with City policies and Government Code Section 65090; and
WHEREAS, on May 26, 2026, the City Council held a duly-noticed public hearing to consider the Ordinance, including: (1) the public testimony and agenda reports prepared in connection with the Ordinance, (2) the policy considerations discussed therein, and (3) the consideration by the City’s Planning Commission; and WHEREAS, all legal prerequisites to the adoption of the Ordinance have occurred.

Page 235 of 1460 ends
Page 3 of 4 ends

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF BRENTWOOD DOES ORDAIN AS FOLLOWS:

SECTION 1. Recitals. The above recitals are incorporated into this Ordinance as though fully set forth herein.

SECTION 2. CEQA. The Project is exempt from the California Environmental Quality Act, pursuant to Public Resources Code Section 21000, et seq., as amended and implementing State CEQA Guidelines, 14 CCR Sections 15000, et seq. (collectively “CEQA”), because the adoption of the Ordinance does not constitute a “project” within the meaning of Public Resources Code Section 21065, or 14 CCR Sections 15060(c)(2) or 15378, because it has no potential for resulting in either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment. Even if the adoption of the Ordinance did constitute a project under CEQA, the objective design standards documents fall within the “common sense” exemption set forth in 14 CCR Section 15061(b)(3), excluding projects where “it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment…” The Ordinance does not authorize new development or increase the density or intensity of uses otherwise permitted. Therefore, the Ordinance is not subject to further CEQA review.

SECTION 3. Rezoning. Brentwood Municipal Code Section 17.870.008 provides:

No rezoning of property or text amendment shall occur which is inconsistent with the city’s community development plan. In making a decision, the Planning Commission and Council shall consider the consistency of the proposed action to the community development plan and other applicable city plans, and shall consider whether the proposed action is inappropriate or otherwise contrary to the public interest.

The zoning text amendment is consistent with the General Plan, as amended from time to time, insomuch as it is responsive to the adopted Housing Element implementation Action H.1g: Residential Design Guidelines, which commits the City to reviewing the Residential Design Guidelines for subjective language and adopting modifications to promote objectivity. In addition, the proposed amendments will help to ensure quality, economic feasibility and sustainable design under the streamlined review and approval processes required by state law; including Senate Bill (“SB”) 35, SB 423, SB 330, Assembly Bill (“AB”) 2011 and other State laws.

SECTION 4. Amendment. Specified sections, or portions of sections, of Title 17 of the Brentwood Municipal Code are hereby amended, as shown in Exhibits A, B, and C, attached hereto and incorporated herein. Exhibit A consists of new Chapter 17.825 (Objective Design Standards); Exhibit B consists of new Chapter

17.815 (By-Right Approval Process); and Exhibit C consists of miscellaneous

Page 236 of 1460 ends
Page 4 of 4 ends

amendments throughout the existing sections of the Brentwood Municipal Code that are reflected in strikethrough for deletions and underline for additions. In addition, the City Council adopts the proposed Brentwood Objective Design Standards for Residential and Mixed-Use Development, which are attached hereto as Exhibit D and incorporated herein. Portions of sections not listed in the attached exhibits are not modified and remain in full force and effect.

SECTION 5. Effective Date; Publication Date. This ordinance shall be published in accordance with Government Code Section 36933. This ordinance shall take effect 30 days after its adoption. The City Clerk is directed to cause the Brentwood Municipal Code to be modified accordingly.

THE FOREGOING ORDINANCE was introduced by title only with the first reading waived at a regular meeting of the City Council of the City of Brentwood held on the 26th day of May 2026 by the following vote:

Page 237 of 1460 ends

Chapter 17.825 Residential Objective Design Standards
§ 17.825.001. Purpose and Intent.
§ 17.825.002. Applicability.
§ 17.825.003. Relationship to Other Standards and Requirements. § 17.825.004. Exceptions.
§ 17.825.005. Review and Decision Procedure.
§ 17.825.006. Appeals.
§ 17.825.001. Purpose and Intent.

This chapter is intended to establish and apply objective design standards to new residential and mixed-use development projects within the City of Brentwood where state law limits the City's enforcement of design standards to objective standards or where state law or the Brentwood Municipal Code requires a by-right approval process, except for those projects described in Section

17.825.002(D). Projects subject to this chapter may request an exception from one or more objective design standards pursuant to Section 17.825.004, to the extent permitted by applicable state law. The purpose of this chapter is to:

A. Create high-quality, enforceable objective design standards.

B. Streamline the review and approval process for qualifying residential and mixed-use projects.

C. Ensure greater certainty for applicants, decision makers, residents, and the public.

D. Enhance the existing character of the city and maintain compatibility with other established uses within the City as new development and property improvements occur.

E. Continue to ensure the highest level of design quality while allowing for appropriate flexibility to create variation as needed.

F. Create objective design standards that involve no personal or subjective judgment and are verifiable by reference to an external and uniform benchmark or criterion.

G. Facilitate the implementation of the Brentwood General Plan.

H. Update standards on a timely basis to respond to new legislative actions. § 17.825.002. Applicability.

A. The provisions of this chapter shall apply to all new residential and mixed-use development projects located within the City of Brentwood, except as otherwise provided in subsection D.

B. The provisions of this chapter shall apply where state law or the Brentwood Municipal Code requires a by-right approval process.

C. The City of Brentwood Objective Design Standards for Residential and Mixed-Use Development are hereby adopted and incorporated by reference herein, as adopted by the City

Page 238 of 1460 ends

Council and amended from time to time.

D. Exempt Housing Projects. The provisions of this chapter are not applicable to:

1. Accessory dwelling units pursuant to Section 17.715.

2. Two-unit projects pursuant to Section 17.790.

3. Mixed-use projects with less than two-thirds of the building square footage dedicated to housing.
§ 17.825.003. Relationship to Other Standards and Requirements.

A. The City of Brentwood intends this chapter to establish reasonable, uniform and comprehensive standards and procedures for residential and mixed housing development within the City of Brentwood, consistent with and to the extent permitted under federal and California State law. The standards and procedures contained in this chapter are intended to, and should be applied to, protect and promote public health, safety and welfare, and also balance the benefits that flow from robust, comprehensive housing development with the City's local values, which include, without limitation, the aesthetic character of the City, its neighborhoods and community.

B. Whenever any provision of the zoning ordinance and any other provision of law including the Objective Design Standards, or any other ordinance or resolution, imposes overlapping or contradictory regulations or contains restrictions covering any of the same subject matter, that provision which is more restrictive or imposes higher standards shall control, except as expressly provided otherwise in this title. The provisions ofthis chapter are intended to support other chapters and design guidelines, including as noted below:

1. Standards for Applicable Zoning District. The Objective Design Standards supplement and are in addition to the development standards for the applicable zoning district in which a proposed project is located.

2. Subdivision Regulations. Title 16 establishes regulations for the subdivision of land throughout the City of Brentwood.

3. Relation to Other Regulations. Where a conflict occurs between the requirements of the Objective Design Standards and other City requirements, that provision which is more restrictive or imposes higher standards shall control, except as expressly provided otherwise in this title or as required by State law.

4. The Objective Design Standards provide language, diagrams, sketches, and graphics to assist developers and the public in understanding the standards and how they shall be applied to qualifying residential projects.
§ 17.825.004. Exceptions.

A. The purpose of these provisions is to establish a procedure by which a property owner may seek an exception of objective design standards as set forth in this chapter where standards are infeasible due to specific physical situations regarding the site or project, or where a unique design solution may be better suited to the site. It shall be the purpose of this procedure to allow justice, while preserving to the greatest possible extent the purposes and intent of the objective design standards.

Page 239 of 1460 ends

B. An exception application shall be prepared, submitted, and processed pursuant to Chapter

17.800. Applicants who request an exception from the objective design standards are required to obtain a discretionary approval and are not eligible for processing pursuant to Chapter

17.815, unless State law requires otherwise. By requesting a discretionary review, the applicant acknowledges and agrees that their project will not be subject to the processing requirements of SB 330. Applicants may be subject to review by the Planning Commission for otherwise by-right projects. In addition, applicants may be required to hold community meetings to get neighborhood input, to the extent permitted by applicable State law.

C. An exception from objective design standards as set forth in this chapter may be granted by the Planning Commission upon determination that all of the following findings can be made:

1. That strict compliance with the specified standard would result in practical difficulty or unnecessary hardship inconsistent with the purposes of the objective standards, due to unique physical or topographic circumstances or conditions of design; or alternatively that strict compliance would preclude an effective design solution improving livability, operational efficiency or appearance.

2. That strict compliance with the standard would deprive the applicant of privileges enjoyed by owners of similarly zoned property; or alternatively that strict compliance would preclude an effective design solution fulfilling the basic intent of the applicable regulations.

3. That if granted, the exception will not adversely affect the character, livability or appropriate development of abutting properties or the surrounding area, and will not be detrimental to the public welfare or contrary to adopted plans or development policy.

4. That the proposed development would be of a quality and character appropriate to, and serving to protect the value of, private and public investments in the immediate area.

5. The resulting architectural style of the structure would be complementary to and compatible with the architectural style of the existing homes in the immediate neighborhood. § 17.825.005. Review and Decision Procedure.

A. The community development director (or designee) shall be the review authority for any objective design review approval for projects subject to the objective design standards for byright permitting processes, as required by state law. Land use approval of any entitlement required in conjunction of the objective design review or for requests for exceptions shall be made by the review authority identified in Chapter 17.800 and/or Chapter 17.820, as applicable.

B. The applicant shall submit all materials to the City, including all materials required by checklists created for the review process to the appropriate body or person pursuant to Chapter

17.800 and the more specific provisions set forth in subsequent chapters for the specific entitlement.

C. The Planning Commission, or, when applicable, the community development director (or designee) shall evaluate the application based on the project's conformance with the objective development and design standards, as well as all applicable regulations of the zoning ordinance and other city ordinances, policies or resolutions.

D. In approving an objective design review subject to objective design standards, the Planning

Page 240 of 1460 ends

Commission, or, when applicable the community development director (or designee) may impose conditions of approval as deemed necessary to ensure that the application:

1. conforms to the General Plan and other applicable plans or policies adopted by the City Council and any additional discretionary approvals;

2. meets the requirements of the zoning district where the proposal islocated, as well as any other applicable provisions of the zoning regulations; and

3. complies with the Objective Design Standards as adopted within, or by reference in, Chapter 17.825.
§ 17.825.006. Appeals.

The design review for residential projects utilizing objective design standards are evaluated under the review processes as provided for by, and in conformance with, this chapter. The reviewing authority may restrict or deny a proposed residential design if it determines that the design is not consistent with the objective design standards. Any such restriction or denial shall be based on written findings identifying the objective standard or standards with which the project does not comply, to the extent required by applicable state law. Action of the Planning Commission, or, when applicable, the community development director (or designee) may be appealed pursuant to Chapter 17.880.

Page 241 of 1460 ends

Chapter 17.815

BY-RIGHT APPROVAL PROCESS
Sections

17.815.001 Purpose.

17.815.002 Definitions.

17.815.003 Eligibility for by-right approval.

17.815.004 Application requirements.

17.815.005 Review of application.

17.815.006 Affordable housing agreement.

17.815.007 Development standards.

17.815.008 Interpretation.

17.815.001. Purpose.

This Chapter specifies the process for reviewing uses entitled to review as a “use by right” by state law. In enacting this Chapter, it is also the intent of the City to implement the goals, objectives, and policies of the City’s Housing Element of the General Plan.

17.815.002. Definitions.

A. For purposes of this Chapter 17.815, “affordable rent” means the maximum allowable rent for a unit affordable to lower income households, equal to one-twelfth (1/12th) of thirty percent (30%) of sixty percent (60%) of area median income adjusted for assumed household size of one person in a studio affordable unit, two persons in a one-bedroom affordable unit, three persons in a two-bedroom affordable unit, and one additional person for every additional bedroom; or as determined by the financing for the project, such as rents established for projects receiving tax credits.

B. “Low barrier navigation center” shall have the meaning set forth in Section 17.030.030.

C. “Low-income household” shall have the meaning set forth in Section 17.725.002.

D. “Permanent supportive housing” means housing as defined in Government Code Section 65650(a) serving the target population as defined in Government Code Section 65650(c) that meets all of the requirements of Government Code Section 65650, et seq., or successor provision and contains no more than 50 units.

E. “Rent” means the total of monthly payments by the tenant of an affordable unit for: (1) use and occupancy of the affordable unit and all facilities associated with the affordable unit, including but not limited to parking, bicycle storage, storage lockers, and use of all common areas; (2) any separately charged fees or service charges assessed which are required of all tenants of units in the project, except security deposits; and (3) an allowance for utilities paid by the tenant.

Page 242 of 1460 ends

17.815.003. Eligibility for By-Right Approval.

The following uses are eligible for by-right approval:

A. Housing development projects located on sites zoned Planned Development 49 (PD-49) Subarea B where:

1. Twenty percent of the total number of housing units in the project are proposed to be available for rent to lower income households at affordable rent or affordable housing cost, as applicable; and

2. No subdivision is required for the housing development.

B. Permanent supportive housing and low barrier navigation centers.

C. All other uses eligible for “by-right” approval under state law.

17.815.004. Application Requirements.

An applicant for a housing development project eligible for by-right approval shall submit an application for design review approval as required by Chapter 17.820. All housing development projects shall comply with all objective design standards applicable to the zoning district and project type, as set forth in Chapter 17.825. No conditional use permit, planned unit development permit, or other discretionary review or approval may be required.

17.815.005. Review of Application.

A. The application for design review approval shall be reviewed as provided in Section 17.820 by the community development director (or designee) subject to appeal as provided in Section 17.820.007.

B. As provided by Government Code Section 65583.2(i), the housing development project is exempt from the California Environmental Quality Act. Review of the housing development project shall be limited to conformance with objective standards established by the general plan, zoning ordinance, and design guidelines.

C. Permanent supportive housing shall be reviewed consistent with the provisions of Government Code Section 65650 et seq.

D. Low barrier navigation centers shall be reviewed consistent with the provisions of Government Code Section 65660 et seq.

E. An eligible by-right housing development project that is “housing for very low, low-, or moderate-income households,” as that term is defined in state law governing the Housing Accountability Act (Government Code Section 65589.5 or successor statute), may be denied only if the decision-making body can make written findings, based upon a preponderance of the evidence in the record, that the project falls within one of the specifically enumerated findings set forth in that statute.

17.815.006. Affordable Housing Agreement.

Page 243 of 1460 ends

A. The applicant shall enter into a binding affordable housing agreement or restrictive covenant consistent with Chapter 17.725 (Affordable Housing), and as described below, with the City, which sets forth the conditions and guidelines to be met regarding the affordable housing included in the project, including but not limited to the type, size and location of each affordable unit; the eligible occupants; affordable rents; phasing of the affordable units in relation to the market-rate units; and other relevant provisions approved by the City Attorney.

B. The affordable housing agreement with the City shall run with the land and shall be prepared in a form approved by the City Attorney, to be executed by the City Manager, or their designee. The agreement shall require the continued affordability of all rental units that qualified the applicant for by-right approval for a minimum of fifty-five (55) years.

Rents for the affordable units shall be set at an affordable rent.

C. The executed affordable housing agreement shall be recorded against the housing development prior to final or parcel map approval, or prior to issuance of building permits for the housing development, whichever is earliest. The affordable housing agreement shall be binding on all future owners and successors in interest.

17.815.007. Development Standards.

A. Building permits and final inspections or certificates of occupancy shall be issued concurrently for the market rate units and for the affordable units that qualified the project for by-right approval, so that the affordable units comprise the required percentage of total units.

B. All affordable units within a residential development shall be comparable to the marketrate units in exterior design, quality, materials, architectural elements and overall construction quality, as well as number and proportion of bedroom types. In addition, all affordable units shall include the same or similar interior amenities offered for market-rate units within a residential development. Affordable units shall be dispersed throughout the residential development so as to prevent the concentration of affordable units.

C. To comply with fair housing laws, the affordable units shall contain the same proportional mix of bedroom sizes as the market-rate units. In mixed-income buildings, the occupants of the affordable units shall have the same access to the common entrances and to the common areas, parking, and amenities of the project as the occupants of the market-rate housing units, and the affordable units shall be located throughout the building and not isolated on one floor or to an area on a specific floor.

D. All housing development projects shall comply with all objective design standards applicable to the zoning district and project type, as set forth in Chapter 17.825 (Residential Objective Design Standards).

Page 244 of 1460 ends

17.815.008. Interpretation.

This chapter is intended to supplement, and shall be construed in a manner consistent with, applicable state housing laws. If any portion of this chapter conflicts with any applicable state law, state law shall prevail. All statutory references in this chapter shall be deemed to include any future amendments or successor provisions.

Page 245 of 1460 ends

Chapter 17.100 Residential Zones – General Regulations
§ 17.100.003. Design and site development review required.

A. Design and site development review shall be required pursuant to Chapter 17.820 for each new housing unit, including a single-family dwelling, duplex, triplex, townhouse, multiple residential dwelling or mobile home.

B. The city council may, through resolution, delegate to the planning department design and site development review for certain types or categories of residential projects.

C. Except as set forth in Subsection D below or prohibited by state law due to procedural timelines, prior to the granting of design and site development review by the planning department, written notification of the pending application shall be given to the planning commission. If any member of the planning commission requests, within five days of receipt of the notification, that a pending application be considered by the commission, such application shall be scheduled at the next regularly scheduled meeting.

D. To the extent that state law prohibits the City from requiring a discretionary design review process for certain residential development projects, such projects shall nevertheless comply with all objective design standards applicable to the zoning district and project type, as set forth in Chapter 17.825 or in any other applicable provisions of this title. Compliance with such standards shall be reviewed through a process consistent with state law pursuant to Chapter 17.815.
§ 17.100.004. Design criteria—Single-family residence.

A. All housing units shall be designed in accordance with all objective design standards applicable to the zoning district and project type, as set forth in Chapter 17.825 (Residential Objective Design Standards) which shall apply to all residential and mixed-use projects.

B. All housing units shall have a minimum overall width and depth of twenty feet.

C. Exterior building material shall be of the type customarily used on conventional housing and shall be compatible with the existing homes in the immediate neighborhood. Recommended siding material includes all types of board; plywood a minimum of one-half inch thick class 303 or 303-6 only with approved stain or paint application, and the use of hot dipped galvanized nails only; stucco; brick, stone, cultured stone; shake or shingle which has been pressure treated at the mill.

D. The architectural style of the structure shall be complimentary to and compatible with the architectural style of the existing homes in the immediate neighborhood.

E. All siding material shall extend to a maximum of ten inches from the finish grade of the lot.

F. All roofing material shall be of the type customarily used on conventional housing and shall be compatible with the existing homes in the immediate neighborhood. Recommended roofing material includes all types of tile; composition which is a thick butt architectural; and cedar shake or shingle which has been pressure treated at the mill.

G. All roofs shall have a minimum twelve-inch eave overhang and shall have a pitch of not less

Page 246 of 1460 ends

than a four-inch vertical rise for each twelve-inch horizontal run.

C. All materials shall be installed in accordance with the Uniform Building Code (UBC) and manufacturer's specifications.

D. All housing units shall have an enclosed two-car garage having an inside clear width of eighteen feet and depth of twenty feet. Garages shall be constructed with material identical to or compatible with the external material of the housing unit. Garage doors shall have a minimum width of sixteen feet except where two doors are provided, in which case the doors shall have a minimum width of eight feet. A garage facing a street shall be set back not less than twenty feet measured from the property line to the center of the garage door.

E. The floor elevation of the housing unit shall be a maximum of twenty-four inches above the finish grade of the lot or be compatible with the immediate neighborhood.

E. All housing units shall comply with the minimum setback standards established for the singlefamily residential zone in which the unit is located.

F. Front yards and unfenced side yards adjacent to a street shall be landscaped in conformance with the standards set forth in Sections 17.630.008(H) through (N). Landscaping shall be installed within eighteen months of occupancy of that housing unit.

Chapter 17.280 DT (Downtown) Zone
§ 17.280.002. Downtown specific plan.

The downtown specific plan establishes the primary means of regulating land use and development within the specific plan area. It also establishes the primary means of planning city actions and investments in support of the growth of the downtown. The regulations contained within the downtown specific plan replace land use and development regulations previously contained within the city of Brentwood's zoning ordinance for this district. Except as provided in Chapter 17.825, which shall prevail where applicable, the provisions of the downtown specific plan shall control, Iin the event of any instance of conflicting regulations with other municipal planning documents containing policies for land use and development in the downtown specific plan area. the downtown specific plan document shall control. The downtown specific plan document does not replace or augment regulations pertaining to issues of building safety codes or other nonplanningrelated codes. All applications for new constructions, substantial modifications to existing buildings, and for changes in land use, shall be reviewed for conformance with the policies contained in the downtown specific plan.

Chapter 17.290 BB (Brentwood Boulevard) Zone
§ 17.290.003. Brentwood Boulevard specific plan.

The Brentwood Boulevard specific plan (BBSP) establishes the primary means of regulating land use and development within the BB zone. It also establishes the primary means of planning city actions and investments in support of the growth and redevelopment of Brentwood Boulevard. The regulations contained within the BBSP replace land use and development regulations previously contained within this title for applicable properties. Except as provided in Chapter 17.825, which

Page 247 of 1460 ends

shall prevail where applicable, the provisions of the BBSP shall control in the event of any instance of conflicting regulations with other municipal planning documents containing policies for land use and development in the BB zone, the BBSP and this chapter shall control. The BBSP and this chapter do not replace or augment regulations pertaining to issues of building safety codes or other nonplanning related codes. All applications for new construction, substantial modifications to existing buildings, and for changes in land use, shall be reviewed for conformance with the BBSP.

Chapter 17.295 PA-1 (Priority Area One) Zone
§ 17.295.003. Brentwood Boulevard Priority Area One specific plan.

The PA-1 SP establishes the primary means of regulating land use and development within the PA-1 zone. It also establishes the primary means of planning city actions and investments in support of the growth and redevelopment of the area within the PA-1 zone. The provisions of the PA-1 SP replace land use and development regulations previously contained within this title for applicable properties. Except as provided in Chapter 17.825, which shall prevail where applicable, the provisions of the PA-1 SP shall control the event of any instance of conflicting regulations with other municipal planning documents containing policies for land use and development in the PA1 zone, the PA-1 SP and this chapter shall control. The PA-1 SP and this chapter do not replace or augment regulations pertaining to issues of building safety codes or other non-planning related codes. All applications for new construction, substantial modifications to existing buildings, and for changes in land use, shall be reviewed for conformance with the PA-1 SP.

Chapter 17.450 Planned Development Zones – General Regulations § 17.450.005. Regulations for lot area, density, yards, height and related matters.

The development regulations, except as provided in Chapter 17.825, which shall apply to all residential and mixed-use projects, shall be specified within the regulations adopted for the specific planned development zone. Deviation from those regulations shall be permitted only through zoning text amendment or the grant of a variance.

Chapter 17.800 Administrative Procedures and Permits
§ 17.800.001. Title and purpose of provisions.

A. Title. The provisions of this article shall be known as the "administrative procedure and permits regulations" of this title.

B. Purpose. The purpose of these provisions is to provide administrative and legislative procedures for the review of plans, the processing and review of applications for consideration and relief under this title, for appeal procedure with respect to zoning administrator and commission determinations and interpretations, and ordinance amendment procedures. Byright permitting processes, as required by state law, may require an applicant to obtain an administrative approval to verify compliance with existing Zoning regulations and objective design standards applicable to the zoning district and project type, as set forth in Chapter

Page 248 of 1460 ends

17.825.
§ 17.800.013. Procedures and permits enumerated.

The following permits or other procedures or entitlements may be used to accomplish the purposes of this title:

A. Chapter 17.810, Development Agreements;
B. Chapter 17.815 By-Right Approval Process
C. Chapter 17.820, Design and Site Development Review;
D. Chapter 17.825, Residential Objective Design Standards E. Chapter 17.830, Conditional Use Permit;
F. Chapter 17.840, Home Occupation Permit;
G. Chapter 17.850, Temporary Use Permit;
H. Chapter 17.860, Variance;
I. Chapter 17.870, Zoning Ordinance Amendment;
J. Chapter 17.880, Appeal;
K. Chapter 17.890, Enforcement and Penalties.
(Ord. 408, 1987)
Chapter 17.820 Design and Site Development Review
§ 17.820.001. Title and purpose of provisions.

A. Title. The provisions of this chapter shall be known as the "design and site development review procedure" of this title.

B. Purpose. The purpose of these regulations is to allow design and site development review of all developments, signs, buildings, structures and other facilities constructed or modified in any zone where design and site development review is required in order thereby to foster a good design character through consideration of aesthetic and functional relationships to surrounding development, and in order to further enhance the city's appearance, and the livability and usefulness of properties.

The purpose of the planning commission or community development director (or designee) in the design and site development review process is to recognize the interdependence of land values and aesthetics, and to provide a method by which the city may implement this interdependence to its benefit, and to the benefit of its individual citizens. It is also the purpose of the planning commission or community development director (or designee) to preserve and enhance the beauty and environmental amenities of the city by:

1. Stimulating creative design;

2. Encouraging the innovative use of materials, methods and techniques;

3. Preserving balance and harmony;

Page 249 of 1460 ends

4. Integrating the functions, appearance, and locations of buildings and improvements, including parking, so as to best achieve a balance between private prerogatives and preferences and the public interest and welfare.
(Ord. 408, 1987; Ord. 663 § 1, 2001; Ord. 1084, 3/11/2025) § 17.820.002. Applicability of provisions.

This procedure shall apply to all proposals for which design and site development review is required by provisions of this title except that approval of a conditional use permit shall satisfy the requirement for design and site development review provided the criteria set forth herein was part of the conditional use permit consideration and so specified as a condition of approval. By-right permitting processes pursuant to Chapter 17.815, as required by state law, may require an applicant to obtain an administrative approval to verify compliance with existing zoning regulations and objective design standards applicable to the zoning district and project type, as set forth in Chapter

17.825.
(Ord. 408, 1987)
§ 17.820.003. Exemptions.

A. Design and site development review shall not be required in the case of:

1. Minor additions to, and remodeling of, existing structures which do not involve a change in the site design and provided that the zoning administrator has approved a "certificate of compatibility" certifying that the proposed addition or remodeling complies with the design criteria set forth in Section 17.820.007.

2. Two-unit housing developments and urban lot splits, which shall comply with the provisions of Chapters 16.169 and 17.797, as applicable. § 17.820.005. Architectural review authority—Design standards and guidelines.

The members of the Brentwood planning commission, as appointed by the city council, or the community development director (or designee) shall have the authority to review, conditionally approve and disapprove architectural plans, drawings and sketches. The community development director (or other ministerial authority) may review projects that are exempt under state law from discretionary review. Such projects may be reviewed pursuant to Chapter 17.815 to verify compliance with existing zoning regulations and objective design standards applicable to the zoning district and project type, as set forth in Chapter 17.825.

The city council shall adopt objective design standards for residential projects as set forth in Chapter 17.825 and design guidelines for commercial and industrial projects, all of which shall be applied by the planning commission, the community development director, and on appeal, the city council, in reviewing applications for development. Said standards and guidelines are to be set forth in pictorial and/or narrative form and may illustrate undesirable as well as desirable examples of design. Documents containing the standards and guidelines shall be available for public reference in the community development department.
(Ord. 408, 1987; Ord. 663 § 1, 2001; Ord. 1084, 3/11/2025) § 17.820.006. Review process.

Page 250 of 1460 ends

A. The planning commission shall review and act on architectural plans concurrently with any other land use permit or entitlement application submitted to the city, such as a conditional use permit or tentative parcel or tract map.

B. The planning commission may delegate specific types of projects to the community development director for review and action.

C. The community development director (or designee) may review projects that are exempt under state law from discretionary review. Such project may be reviewed pursuant to Chapter

17.815 to verify compliance with existing zoning regulations and objective design standards applicable to the zoning district and project type, as set forth in Chapter 17.825. § 17.820.007. Design and site review criteria.

The planning commission, community development director, and on appeal the city council, in consideration of all applications for design and site development review shall determine whether the proposed project conforms to the following criteria:

A. The proposed development shall comply with all applicable design criteria or standards set out in this title or other city ordinance including those set forth in Chapter 17.825the City's Objective Design Standards for Residential and Mixed-Use Projects (including interim standards as adopted by the city council through ordinance 1060) and the City's Commercial and Industrial Design Guidelines;
B. Where the proposed development is located in an area for which a specific plan, planned development, neighborhood plan or precise plan has been adopted by the city council, the design of the development shall conform in all significant respects with such plans; C. The proposed development shall conform with all requirements for landscaping, screening, parking, usable open space and off-street loading as set forth in this title; D. All applicable regulations of the zoning ordinance and other city ordinances, policies or resolutions.
(Ord. 408, 1987; Ord. 663 § 1, 2001; Ord. 1084, 3/11/2025)

Page 251 of 1460 ends

MARCH 2026 DRAFT

FOR R ES I D EN T I A L &

MIXED-USE DEVELOPMENT

CITY OF

BRENTWOOD

OBJECTIVE DESIGN STANDARDS

Page 252 of 1460 ends

i

BRENTWOOD ODS

ACKNOWLEDGMENTS

CITY COUNCIL

PLANNING COMMISSION

CITY STAFF
Susannah Meyer Mayor
Pa’tanisha Pierson Vice Mayor
Faye Maloney Council Member
Jovita Mendoza Council Member
Tony Oerlemans Council Member
Rod Flohr Chairperson
Kristopher Brand Vice Chairperson
Gerald Johnson Commissioner
Jeremy Jones Commissioner
Anita Roberts Commissioner
G. Harold Duffey City Manager
Thomas Lloyd Smith Interim City Attorney
Alexis Morris Director of Community Development
Erik Nolthenius Planning Manager
Jennifer Hagen Principal Planner

Page 253 of 1460 ends

CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT ii

PREPARED FOR

PREPARED BY

ADOPTED BY
City of Brentwood
150 City Park way,
Brentwood, CA 94513
Ordinance XX - X
JZMK Partners
3080 Bristol Ave, Suite 350
Costa Mesa, CA 92626

Page 254 of 1460 ends

iii BRENTWOOD ODS

CONTENTS
1 INTRODUCTION

1.1 Purpose. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

1.2 Organization. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1.3 Applicability. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

1.4 User Guide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

1.5 Relationship With General Plan & Zoning Code. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

1.6 Terminology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 2 SITE PLANNING

2.1 Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

2.2 Edge Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

2.3 Block Size & Structure. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

2.4 Usable Open Space. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

2.5 Public Open Space. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

2.6 Single Family Subdivisions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

2.7 Two Unit Housing Development & Urban Lot Splits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 3 SITE DESIGN

3.1 Shared & Private Open Space. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

3.2 Vehicular Access & Parking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48

3.3 Bicycle Circulation & Parking. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51

3.4 Pedestrian Access & Circulation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

3.5 Site Lighting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 4 BUILDING DESIGN

4.1 Massing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

4.2 Building Orientation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73

4.3 Step-Backs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75

4.4 Articulation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

4.5 Façade Design. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77

4.6 Ground Floor Uses. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80

4.7 End Units. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84

4.8 Window Alignment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 85

4.9 Street Facing Transparency. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86

Page 255 of 1460 ends

CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT iv

4.10 Noise And Odor Attenuation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88

4.11 Entry Typologies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89

4.12 Utilities, Service Areas & Building Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99 5 ARCHITECTURAL STYLES

5.1 Overview And Applications. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107

5.2 Spanish. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110

5.3 Mediterranean. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118

5.4 Ranch. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 126

5.5 Craftsman. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132

5.6 Queen Anne. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138

5.7 Italianate. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 144

5.8 Colonial. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 6 LANDSCAPE

6.1 Landscape Materials & Vegetation (S,M,L). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159

6.2 Irrigation (S,M,L). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 164

6.3 Fire Hazard (S,M,L). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166

6.4 Hardscape (S,M,L). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 167

6.5 Walls & Fencing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 168

6.6 Landscape Lighting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 170

6.7 Site Furnishings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174

Page 256 of 1460 ends

v

BRENTWOOD ODS

INTRODUCTION

1.1 PURPOSE

1.2 ORGANIZATION

1.3 APPLICABILITY

1.4 USER GUIDE

1.5 RELATIONSHIP WITH GENERAL PLAN & ZONING CODE

1.6 TERMINOLOGY

Page 257 of 1460 ends

1 1

CITY OF BRENTWOOD

OBJECTIVE DESIGN STANDARDS
- DRAFT

Page 258 of 1460 ends

2 BRENTWOOD ODS

1.1 Purpose

1.1.1 Overview
The development of new residential and mixed-use projects in the City of Brentwood (hereafter referred to as the “City”) is guided by a long-standing commitment to high-quality design, community character, and a strong sense of place. Historically, development has been regulated through a coordinated framework of planning and regulatory documents, including the General Plan, the Zoning Ordinance, and a range of topic-specific regulations and design guidelines. These documents reflect both Brentwood’s unique cultural roots and its evolution as a growing Bay Area community seeking to balance change with continuity.

Brentwood’s identity is deeply shaped by its agricultural heritage and rich history. Long before European settlement, the area now known as Brentwood was home to several Native American tribes, including the Tuchiyunes, Acalanes, Bologones, and Caruinez, who established communities along the region’s fertile soils. In 1772, Spanish soldiers exploring the Mount Diablo area settled what became known as Los Meganos Rancho. The Rancho was later sold in 1837 to Dr. John Marsh, the first American citizen of what would become Contra Costa County. Dr. Marsh built the first permanent home in the area in 1851, which still remains at its original location on the outskirts of the City.

The arrival of the railroad marked a turning point, transforming Brentwood into an organized town. As rail lines expanded across the Marsh Ranch, land was donated to establish a town site, and Brentwood took shape as a recognizable community. By the late nineteenth century, the area had become a major agricultural center and one of the largest shipping points for wheat and barley between New Orleans and San Francisco. In the early twentieth century, the construction of a major irrigation system further diversified local agriculture, solidifying Brentwood’s reputation as a thriving farming community. Today, agriculture remains an important part of the City’s identity, with working farms still located on the outskirts of town and seasonal harvests drawing visitors from across the region.

As Brentwood has grown, development has expanded outward from its historic downtown core, which remains a focal point of older commercial and residential buildings that embody the City’s small-town character. While new neighborhoods and mixed-use districts have been introduced to accommodate population growth, the City has consistently emphasized the importance of preserving its rural atmosphere, human-scaled development patterns, and visual continuity. One of the City’s long-standing General Plan goals is to create and maintain a strong sense of place by preserving and enhancing Brentwood’s identity and small-town qualities. 1 INTRODUCTION

Page 259 of 1460 ends

CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 3
This philosophy was historically reflected in the City’s residential design guidelines, which were adopted to articulate community expectations, encourage thoughtful architecture, and ensure that new development respects the past while embracing future growth. These original guidelines emphasized consistent high-quality residential development, pedestrianoriented neighborhoods, visual continuity balanced with architectural diversity, and the sensitive integration of higher-density housing types. They also stressed the importance of high-quality materials, durable construction, and attentive architectural and landscape details, including porches, roof overhangs, mature landscaping, and articulated building forms.

In recent years, the regulatory context for housing development in California has changed significantly.

The passage of several state housing laws—including Senate Bill (SB) 35, SB 330, SB 6, and Assembly Bill (AB) 2011—has introduced new requirements to streamline housing approvals and limit discretionary review for qualifying projects. Under these statutes, cities must approve eligible housing proposals through ministerial processes, provided that such projects comply with applicable objective standards.

In response, the City of Brentwood has chosen to adopt Objective Design Standards (ODS) as a modernized extension of its long-standing design values. These standards translate the community’s historic design principles into clear, measurable, and consistently applied rules that can be used in a ministerial review context. In doing so, the City seeks to preserve the spirit and intent of its original guidelines while aligning with state law requirements for objectivity, predictability, and legal defensibility.

The Objective Design Standards are intended to facilitate housing production efficiently while maintaining the high design quality long expected by the community. They provide a transparent framework for evaluating residential and mixed-use projects, ensuring that development continues to reinforce neighborhood character, promote pedestrian-oriented environments, and contribute to cohesive community design. By articulating measurable requirements rather than subjective preferences, the City strengthens the defensibility of its regulations and demonstrates that its standards are reasonable, proportionate, and aligned with state housing mandates.

Ultimately, the Objective Design Standards represent an evolution of Brentwood’s planning legacy.

They build upon the City’s historic commitment to thoughtful design, respect for community character, and high-quality development, while responding pragmatically to contemporary legal and housing challenges. Through this approach, Brentwood seeks to continue welcoming new residents, supporting housing diversity, and fostering growth that honors its agricultural roots, historic downtown, and enduring small-town identity.

Page 260 of 1460 ends

4 BRENTWOOD ODS

1.1.2 Goals
The purpose of these Objective Design Standards is to require high-quality single-family, multifamily, and mixed-use residential development through a clear set of rules that are understandable to the general public, City staff, and the development community. The three primary goals of these standards are to:

The three primary goals of these standards are to:
a. Preserve the character of Brentwood’s neighborhoods by balancing the form and design of existing development with new construction techniques and styles. b. Encourage human-scaled buildings that promote high quality site and building design. c. Emphasize a pedestrian-oriented environment where buildings and public realm design are cohesive and complementary of a diverse range of uses. d. Establish clear, objective, and consistently applied design requirements that help demonstrate the City’s standards are reasonable, predictable, and aligned with state law, thereby strengthening the City’s legal defensibility in the review and approval of housing projects.

Page 261 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 5

1.2 Organization
The Objective Design Standards ar organized, starting with an introduction, in six sections:

1. Introduction

2. Site Planning

3. Site Design

4. Building Design

5. Architectural Styles

6. Landscape
The Purpose subsection outlines the high-level goals of the section through subsections that organize one or more design standards to regulate specific design guidance. Additionally, the purpose of the ODS draws from Goals and Policies of the Brentwood General Plan. The design guidance is provided for each subsection with an intent statement that outlines General Plan and other planning policies and specific intent of the standards that follow.

Page 262 of 1460 ends

6 BRENTWOOD ODS

1.3 Applicability

1.3.1 Applicable Project Types
These Objective Design Standards apply to all new construction projects that meet the following criteria:

1. Single-family projects. Defined as a project consisting of single-family residential uses with detached dwelling units.

2. Multi-family projects. Defined as a project consisting of multifamily residential uses with two (2) or more attached dwelling unitse.

3. Mixed-use projects, featuring a combination of residential and other uses with the residential use at a minimum density of 6.5 dwelling units per acre.

All other project types including commercial-only projects and interior renovations less than 30% of floor area are not subject to these objective design standards but must satisfy existing development standards in the Zoning Code.

1.3.2 Exceptions & Exemptions
All applicable projects are required to comply with Objective Design Standards. Should a project not be able to or choose not to adhere to the Objective Design Standards, approvals through the Excemptions process may be requested.

Excemptions: See Brentwood Municipal Code Title 17: Chapter 17.825.004

Page 263 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 7

1.4 User Guide
The Objective Design Standards are intended for residents, property and business owners, developers, builders, architects, designers, and City staff involved in the review and approval of single-family, multi-family, and mixed-use developments within the City. The following steps are a quick way to understand the different sections of the document and how to use it.

Step 1: Review the Site Planning & Site Design Standards.

Site Planning involves a careful analysis of the opportunities and constraints of the site, including but not limited to existing features including mature trees, topography, drainage patterns, easements, and other dedications, including public rights-of-way, open space, and stormwater buffers. The components of site development extend beyond building placement and configuration, including surrounding uses, retaining walls, landscape design, hardscape considerations, and parking.

The Site Design Standards outline several requirements on these topics.

Step 2: Review the Building Design Standards.

While new projects need not copy existing development, their mass and scale shall respect adjacent building context and uses. The Building Design standards establish requirements on these issues. These standards apply no matter which style is being utilized for the project design.

Page 264 of 1460 ends

8 BRENTWOOD ODS
Step 3: Review the Architectural Style Standards.

The design and detailing of buildings are paramount to a quality environment, and the City is committed to authentic expressions of architectural style. Architectural design elements and materials shall be consistent throughout the project, recognizing that a building is 3-dimensional and must be well designed on all sides. Detailing, materials, window and door choices shall reinforce the overall project design. To provide guidance on architectural styles, the architectural standards offer a menu of elements and traditional details in which individual buildings may be designed.

The selected styles are based on prevailing designs in Brentwood’s neighborhoods, specific plan areas and City planned development. Additional feedback has been provided from community outreach and an online survey to provide a range of appropriate styles.

The styles are as follows:
• Spanish
• Mediterranean
• Ranch
• Craftsman
• Queen Anne
• Colonial
• Italianate
• Contemporary
Within each style section, a description of various elements related to roof forms, windows, decorative details, and other topics are provided. The Architectural Style standards require certain elements, while other elements may be selected from a menu of options.

Page 265 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 9
Step 4: Review the Mixed-Use Development Standards, if applicable.

For developments that incorporate a commercial component in addition to residential housing, the Mixed-Use Development Standards, located at the end of each chapter of Architectural Style, provide direction on the design of storefronts, types of decorative accents, and other relevant topics. Mixed-use proposals shall be consistent with these standards.

Step 5: Review the Brentwood Municipal Code and consult with Community Development Staff.

All developments must comply with the subdivision, land development, and zoning regulations contained in Titles 16 and 17 of the Brentwood Municipal Code. Applicants should consult with Community Development Department staff for assistance in understanding and complying with these regulations.

Step 6: Consult with the Community Development Planning Division It is highly recommended for prospective applicants to obtain and become familiar with the application and submittal requirements for a project prior to a formal submittal. Additionally, the Community Development Department offers a Conceptual Project Review (CPR) service that is available to the public. A CPR application allows applicants to receive staff review from various departments prior to a formal application submittal.

The Brentwood Municipal Code establishes required procedures for submitting and reviewing development applications. Applicants should consult with Community Development Department staff for assistance with these procedures and requirements.

Page 266 of 1460 ends

10 BRENTWOOD ODS

1.5 Relationship With General Plan & Zoning
Code
The Objective Design Standards in this document work as a baseline, creating citywide standards that apply to all new single family, multi-family and mixed-use residential projects. This document shall work in tandem with the Brentwood Municipal Code or guideline documents, including but not limited to the City’s General Plan, Zoning Code and Planned Developments. Any design standards from the ODS shall supercede those in the General Plan, or Zoning Code, if there are conflicting guidelines or regulations unless otherwise approved by the Director of Community Development.
• General Plan. The General Plan contains objective standards related to development density for all land uses in the City. The Objective Design Standards in this document are consistent with the General Plan and dictate the bulk, mass, and design of buildings in a more finegrained way than the General Plan. • Zoning. Titles 16 (Subdivisions and Land Development) and 17 (Zoning) of the Brentwood Municipal Code, and applicable Specific Plans contain objective standards including setback, height, parking, and open space requirements. These district-by-district standards will continue to dictate basic development standards, and the Objective Design Standards will apply in addition to these requirements, providing refinement in terms of site and building design. • Other Municipal Code Sections. The City also maintains and enforces standards including but not limited to stormwater drainage, roadway and traffic requirements, sewer, water and standards for working within the public right-of-way to install sidewalks, street trees, and lighting. These standards will continue to apply and will supercede any conflict with the ODS. • Building Standards Codes. All construction in the State of California is subject to the California Building Standards Codes which dictate health, safety, and energy and water efficiency standards for new and remodeled structures. Refer to Title 15 of City of Brentwood Municipal Code for additional specifications and requirements. These standards will continue to apply and will supercede any conflict with the ODS.
• Standard Plans & Specifications and Engineering Procedures Manual. All public and private site improvements are designed and constructed in accordance with the Standard Plans and Specifications providing a framework for consistent, safe, efficient, and high-quality construction and maintenance of public and private infrastructure. These standards will continue to apply and will supercede any conflict with the ODS.

Page 267 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 11

1.6 Terminology
The following terminology is applicable to the Objective Design Standards and can be found within the ODS document. Definitions of terms found below apply only to this document and will take precedence over the Brentwood Municipal Code in cases of conflict, but only within the context of this document. Additional definitions that may be applicable to the ODS document may be found within the City of Brentwood Municipal Code.

Active Frontage: Active frontages are building frontages with active uses where there is visual engagement between those in the street and those on the ground floor. Active uses include retail stores, restaurants, markets, galleries, libraries, community centers,common areas and offices that generate high pedestrian traffic throughout the day.

Alley: A public thoroughfare used as a secondary vehicular means of access.

Arcade: A series of arches supported by columns or piers, typically forming a covered walkway or passage.

Arched Lintel: A structural element above an opening, like a door or window, that is shaped as an arch to support the weight of the wall above.

Back-of-walk: The edge of a sidewalk that is furthest away from an adjacent road, or closest to the extent of the right-of-way.

Belvedere: Architectural structure, often a small tower or rooftop pavilion, designed to provide a panoramic view.

Block Length: The length of a parcel or series of parcels measuring from the edge of one public right-of-way or public access easement to another.

Board and Batten Siding: A wall cladding system consisting of wide vertical boards with narrower strips (battens) covering the seams between the boards.

Brackets: Projecting supports attached to the wall or eaves that help support roof overhangs or decorative elements.

Building Envelope: the physical separator between the conditioned and unconditioned environment of a building including the resistance to air, water, heat, light, and noise transfer.

Building Façade Full Break: A significant interruption or separation in the façade, including a passageway, courtyard, or a change in building height that visually and structurally divides the building.

Page 268 of 1460 ends

12 BRENTWOOD ODS
Building Frontage Components Terminology: There are three zones that make up the space between a street’s curb to the building face. A fourth zone, the vehicle throughway, is where movement of autos and bikes occur.

1. Frontage/Setback Zone: Located on private property, providing a transition or buffer between buildings and the public realm and allows people to access buildings without interfering with pedestrian movement.

2. Pedestrian Clear Zone: Located in public right-of-way or a public access easement, this zone is where movement of people is the priority. Sidewalks or other hardscape surfaces meant for foot traffic are its defining component.

3. Buffer Zone: Located in public right-of-way or a public access easement, this zone is where street trees, traffic control devices, and lighting are located, and provides a buffer between where people walk and the street.

4. Vehicle Throughway: Space intended for parking, drop-off or movement of mobile traffic, be it vehicular, personal electric transportation or bicycles.

Page 269 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 13 Building frontage in public and private streets shall be designed in accordance with the zones illustrated below:

FIGURE 1.1 RESIDENTIAL FRONTAGE
R.O.W.

PUBLIC FRONTAGE
LOT

PRIVATE FRONTAGE
s a b c
FIGURE 1.2 MIXED-USE FRONTAGE
R.O.W.

PUBLIC FRONTAGE
LOT

PRIVATE FRONTAGE
s a b c
Frontage/Setback Zone
Pedestrian Clear Zone
Buffer Zone
a c Vehicle Throughway
s b
TABLE 1.1: REQUIRED PUBLIC OPEN SPACE

VEHICLE THROUGHWAY
• Street Parking
• Bike Lanes
• Loading/Drop-Off Zones
• Parklets
• Bus Stops
R.O.W. PEDESTRIAN REALM

PEDESTRIAN

CLEAR ZONE BUFFER ZONE
• Sidewalk • Street Trees/Planting
• Street Lighting
• Seating
• Bike Parking
• Public Art
• Outdoor Dining
• Bus Shelters
• Utilities (e.g., hydrants)

FRONTAGE/SETBACK ZONE
• Additional Dining Space
• Courtyards
• Building Arrival Space
• Planted Areas
• Hardscape
• Slope Areas

Page 270 of 1460 ends

14 BRENTWOOD ODS
Building Façade Length: The overall length of a façade without a full break in the building.(see full break definition below)
Building Projection: The part or feature of a building which extends outside of the enclosing walls. It can be a building feature that is mounted on, and/or extends from the surface of the building wall or façade, typically above ground level.

Build-To Zone: A specific distance beyond the building setback from the front property line to the building face, excluding areas for Mid-block Connections, Primary Connections, Secondary Connections, or Public Open Space.

Carriage-Style Garage Doors: Doors designed to resemble the hinged, swing-out doors of historic horse-drawn carriage houses, typically featuring decorative panels, crossbucks, or trim details, and often simulated with modern overhead or sliding mechanisms.

Clay-Tile Roof: A roof system that uses fired clay tiles as the primary exterior roofing material, installed over an underlying roof structure to provide weather protection and architectural character.

Connection: A space that links one physical space to another. It may be traversable by pedestrian, bicycle or automobile traffic.

Corrugated Metal Roof: A roofing system made of metal panels with a wavy or ridged profile, designed to increase strength and efficiently shed water.

Corrugated Panels: Metal or other material sheets with a series of parallel ridges and grooves (corrugations) that increase strength and stiffness.

Craftsman Tapered Pillars: Vertical support elements that gradually decrease in width from the base to the top, typically used on porches or entryways in Craftsman-style architecture. They are often mounted on a masonry or concrete pier and support roof elements or overhangs while emphasizing the horizontal and sturdy proportions characteristic of the style.

Curved Roof: A roof whose surface is continuously arched or curved rather than flat or angular.

Decorative Veneer Accents: Thin, non-structural layers of material applied to building façades or architectural elements to provide texture, pattern, or visual interest, while emulating the appearance of natural masonry, stone, brick, or other premium materials.

Double-Hung Sash: A type of window with two movable sashes (frames holding glass) that slide vertically past each other within the window frame.

Earth-Tone Colors: Colors inspired by natural elements including soil, rocks, clay, sand, and vegetation, typically muted, warm, and neutral in appearance.

Page 271 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 15 Eave: The lower edge of a roof that extends beyond the exterior wall of a building.

End Unit: A dwelling unit at the end of a connected row of homes with only one shared wall on one side. End units tend to include additional windows on the wall that isn’t attached providing more natural light.

Engineered Wood: A man-made wood product created by binding or layering wood fibers, strands, veneers, or particles with adhesives to form structural or panel products.

Exposed Beams/ Rafter Tails: Structural or decorative elements of a roof in which the ends of beams or rafters extend beyond the exterior wall and remain visible, rather than being concealed by soffits or fascia. They contribute to the architectural character and articulation of rooflines.

Façade Composition: The expression of a façade through a variety of techniques including forms, patterns, fenestration, elements, details, materials, texture, finishes, etc. Façade Composition is used to create the architectural character and design theme of a building.

Façade Modulation: Used to shape a building’s exterior massing, façade modulation is a change in building plane though the recess or projection of sections of a façade.

Façade Plane: Any stretch of a building façade existing along the same axis line, regardless of pattern differentiation or change in rhythm.

Foot-Candle: A measurement of illumination on a one-square foot surface from a uniform source of light.

Footprint: Footprint or building footprint provides the outline of a building drawn along the exterior walls, with a description of the exact size, shape, and location of its foundation.

Gabled Roof: A roof form with two sloping planes that meet at a central ridge, creating a triangular wall section known as a gable at each end of the building.

Height: The height of a structure is defined as the vertical distance from finished grade to the highest point of a structure.

Hip Roof: Roof type in which all sides slope downward toward the walls, usually with a gentle or moderate pitch, and has no vertical ends (no gables).

Landscaped Area: Surface area dedicated for planting of trees, shrubs, flowers, ornamental grass, turf (natural or artificial), ground cover, or other horticultural elements.

Lintels: A horizontal structural element placed over an opening, including a door or window, to support the weight of the wall above.

Page 272 of 1460 ends

16 BRENTWOOD ODS
Live/Work: A building or area within a building that combines both residential with commercial, retail or office use.

Low-Profile Ribbed Panels: Metal roofing panels that have shallow, narrow raised ribs or seams, giving a subtle textured appearance while shedding water and providing structural strength.

Marquesina Awnings: A small, projecting canopy over a door, window, or entryway, commonly used in Spanish-style architecture, typically supported by brackets or columns and finished with fabric, canvas, or clay tiles to complement the building’s façade and roof.

Masonry Roof: A masonry roof uses durable, individual units like brick, stone, or concrete blocks/ tiles and does not need to be a structural masonry roof.

Metal Roof: A durable, long-lasting roof material made from metals. These may also include metal roofs which are stone-coated.

Metal-Shingle Roof: A roof covering made of individual metal shingles designed to mimic the appearance of traditional roofing materials like slate, wood shake, or tile.

Metal-Tile Roof: A roof covering made of metal panels shaped to resemble traditional clay or concrete tiles.

Mid-Block Connection: A public right-of-way or private land area with a public access easement that connects from one public right-of-way to another public right-of-way.

Modified Grid: An interconnected network of streets generally rectilinear in alignment and orthogonal at intersections, with modifications to allow for terrain or environmental considerations, including occasional curves or diagonally directed streets. The gridiron-like layout and shorter blocks typical of the modified grid street pattern allow for multiple travel routes, dispersing vehicular traffic within a geographic area, and encourage pedestrian activity.

Multi-Pane Windows: Windows in which the glazing is divided into two or more individual panes or lights, separated by muntins, mullions, or grids, creating a pattern of smaller glass sections within a single window frame.

Muntins: The narrow strips of material that divide a window sash into smaller panes of glass (also called lights or lites).

Octagonal Turret: A small, tower-like projection from a building with eight sides, often extending above the roofline.

Page 273 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 17 Outdoor Rooms: Outdoor rooms are an extension of a living space, an outside space that promotes greater connection to the outdoor. It can include anything from an attached, screened-in porch to a detached gazebo or a landscaped area with a bench.

PA-1: Priority Area One, a specific plan that is bounded by Lone Tree Way to the north, Shady Willow Lane to the east, Sand Creek to the south, and Heidorn Ranch Road to the west; and bisected from north-to-south by State Route 4.

Parapet: Vertical extension of a wall above the roofline, railing, or terrace edge; can be purely decorative or serve as a safety barrier
Parking/Loading/Flex Zone: An essential zone for people and goods, providing separation between moving vehicles in the travel-way and people in the pedestrian realm. This zone can contain multiple uses along a street including commercial deliveries, parklets, on-street parking, and taxi zones. It can be used for mobility at specific times of the day.

Park/Public Park: All areas within the city, operated, maintained or controlled by the city that are designated for use as park, recreation or open space purposes, whether such property is a park, parkway, greenbelt, sports field, internal or adjacent sidewalks, general trail, on-street parking adjacent to park property, children’s playground area, picnic area, or is maintained as open space, including undeveloped sites for future parks and includes any structure thereon.

Paseo / Pedestrian Path: A public place or path designed for walking; promenade that connects into or through a development.

Pedestrian-Scaled Block: A development block that is dimensionally sized to suit pedestrian flow rather than fit the needs of automobile traffic and circulation. Landscape and architectural elements are sized and spaced to be perceived from a short distance.

Perimeter Length: The lineal distance as measured along the perimeter of a building, parcel, lot, etc.

Planter: An above grade container for planting.

Podium: The lower floors of a building that form the “base” of a building typically including a courtyard level above. Podiums typically include structured parking, a courtyard level above, a different and larger floorplate than floors above, and may be a different construction type than the rest of the building.

Podium Level: The level directly above the Podium. The Podium Level typically includes a courtyard, a smaller building area than the levels below, and a change in construction type.

Page 274 of 1460 ends

18 BRENTWOOD ODS
Primary Building Entry: The entrance to a building typically leading to a lobby, courtyard, or other large shared space that is accessed from the primary building frontage.

Primary Building Frontage: The building frontage that abuts the most primary of streets, Pedestrian Pathway, or Mid-Block Connection surrounding the building. In the case of a through-lot, the primary building frontage could be on either public right-of-way.

Primary Façade Plane: Majority area of the façade that is in the same plane.

Public Open Space: A publicly accessible open space area on a privately developed parcel that may include plazas, courtyards, seating areas, parks, parklets, play areas, recreational facilities or equipment, dog parks, etc.

Public Service Utilities Easement (PSUE): A portion of property that cannot be built on, planted on, otherwise covered or obstructed so that underground or overhead public utilities can be accessed for maintenance and repair.

Queen Anne Style Ornamentation: Intricate decorative detailing characteristic of the style, including turned woodwork, which are delicate wooden spindles often seen on porch railings, balusters, and friezes, sometimes called “ginderbread trim” in vernacular references. Patterned shingles or wall textures in fish-scale, diamond, or scalloped patterns and shape area also ornamental features. Gables can also be ornamental with decorative bargeboards, finials, or cresting. Often porches will have decorative details of curved or turned posts, railings, brackets and latticework framing the entry.

R-1-E/SFR: A designated zone as described in the Brentwood Municipal Code and labeled as R-1-E, single-family residential estate zone. Designation shall be interchangeable with SFR as described in this document.

R-1/SFR: A designated zone as described in the Brentwood Municipal Code and labeled as R-1, single-family residential zone. Designation shall be interchangeable with SFR as described in this document. PD and Specific Plan subareas that allow for densities less than 5 dwelling units per acre are to be treated as SFR.

R-2/MDR: A designated zone as described in the Brentwood Municipal Code and labeled as R-2, moderate density multi-family residential zone. Designation shall be interchangeable with MDR as described in this document. PD and Specific Plan subareas that allow for densities between 5 and 11 dwelling units per acre are to be treated as MDR.

Page 275 of 1460 ends

INTRODUCTION
CITY OF BRENTWOOD OBJECTIVE DESIGN STANDARDS - DRAFT 19 R-3/HDR: A designated zone as described in the Brentwood Municipal Code and labeled as R-3, high density multifamily residential zone. Designation shall be interchangeable with HDR as described in this document. PD and Specific Plan subareas that allow for densities between 11 and 20 dwelling units per acre are to be treated as HDR.

RE/SFR: A designated zone as described in the Brentwood Municipal Code and labeled as RE, ranchette estate zone. Designation shall be interchangeable with SFR as described in this document.

Saltbox Roof: A asymmetrical pitched roof with one long slope and one short slope, typically extending down the rear of a building.

Shed Dormers: A roofed projection that extends vertically from a sloped roof, featuring a single, sloping roof plane that typically slopes in the same direction as the main roof but at a shallower angle. It provides additional headroom, light, and usable space within the upper story or attic.

Shed Roof: A single-sloped roof form consisting of one continuous plane that pitches in one direction, without ridges, hips, or valleys.

Slate Roof: A roof system that uses natural slate stone tiles as the primary exterior roofing material, installed in overlapping courses over a supporting roof structure.

Spanish Clay Tile Vent: Small, decorative clay tile or cast element embedded in a stucco or masonry wall to allow air circulation, while maintaining the characteristic terra-cotta color and Spanish architectural style.

Square Tower Hip Roof: A roof type for a square or nearly square tower where all four sides slope downward from a central peak, forming a hip roof over the tower.

Standing Seam Metal Roof: A metal roofing system composed of continuous panels running vertically from the roof ridge to the eave, with raised seams (ribs) that interlock to conceal fasteners.

Step-back: A step-back (or building step-back) is an architectural design element that is typically applied to the upper-story of a building or development. Typically, a step back requires that any portion of a building above a certain height is further pushed-in towards the center of the property.

Storefront Commercial: Any commercial property located on the ground floor that has a storefront window that may be individually leased or rented for any purpose other than residential use.

Transparency: The amount of transparent area on a building façade.

Page 276 of 1460 ends

20 BRENTWOOD ODS
Usable Green Space: An unobstructed area or areas, accessible in whole or in part to all occupants of the building it serves, and being available for safe and convenient use for recreation or leisure activities. It may be on roofs or structures or at grade and may include private balconies or patios but shall not include Off-Street parking areas, Off-Street loading areas or service driveways.

Usable Open Space: The total combined open space areas of publicly accessible, common, and private open spaces.

VHDR: A density range category where allowable residential density of a development project is between 21 and 30 units per acre. Designation shall be interchangeable with MFVHDR as described in the PA-1 specific plan document.

Vinyl: A synthetic plastic material (polyvinyl chloride, PVC) used for exterior cladding, trim, windows, and other architectural elements.

Visible Light Transmittance: A measurement of the amount of light in the visible portion of the spectrum that passes through glass. The higher the number, the greater the amount of light that is passing through the glass. Visible transmittance (VT - expressed as a number from 0 to 1), is the typical measurement used for windows.

Wood Shakes: Thick, textured, rustic roofing or siding materials hand-split (or machine-split to micic this) from logs, offering more natural variation
Wood Shingles: Thin, tapered, smooth, and machine sawn pieces of wood used for roofing and siding

Page 277 of 1460 ends
← All documents from this meeting