Cities Index.
Agenda packet

Chino City Council
October 21, 2025

Document
Agenda packet
Meeting
October 21, 2025
Body
Chino City Council
Pages
87
Original file
105.9 MB
Text extracted from the city's file for reading and search. Open the original on chino.legistar.com. That file is the official record.

B. Based on substantial evidence, both written and oral, from the public hearing, the Planning Commission makes the following findings and takes the following actions on PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval), and PL24-0120 (Special Conditional Use Permit):

1. PL24-0098 (Site Approval)
a. The proposed Project is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s). The Project site has a General Plan land use designation of Light Industrial (LI). The LI land use designation is intended for industrial uses with fewer impacts on traffic, noises, odors and pollutants and allows for a broad range of uses. The Project has been designed to meet applicable development standards and design guidelines. The Project serves General Plan Goal LU-2 and Objective LU-2.1 which aim to foster the development of new industrial uses in the City while preventing negative impacts on the health, safety, and welfare of residents and General Plan Objective LU-1.3 which encourages commercial development that will support and enhance vibrant commercial areas and serve existing neighborhoods;
b. The proposed Project is permitted within the zoning district in which it is proposed and complies with all applicable provisions of the City’s Zoning Code. The Project is located in the Light Industrial (M1) zoning district and consists of a 158,548 square foot warehouse industrial building and a 3,540 square foot food and beverage building with an outdoor dining area. The restaurant uses and the size of the warehouse building, which exceeds 50,000 square feet, require approval of a Special Conditional Use Permit.

Additionally, the Project meets or exceeds all minimum development standards related to setbacks, building height, lot coverage, parking, and landscaping;
c. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape, access, type and intensity of development have been met or exceeded. The 7.35-acre site is flat and will have adequate infrastructure and four points of vehicular access from Schaefer Avenue and Oaks Avenue. Utilities and stormwater improvements will be extended to serve the site;
d. The subject site for the Project relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed Project, in that the Project site is located along Schaefer Avenue, which is designated as a primary arterial and Oaks Avenue, which is designated as an urban industrial collector.

Access to the site is provided from the adjacent streets. Additionally, 16978
RESOLUTION NO. PC2025-012

Page 3 of 7 ends

Schaefer Avenue is designated as a truck route. Both streets are currently improved and has adequate capacity to serve the proposed Project; e. The proposed Project is compatible with those abutting properties and in the surrounding area. The Project is located within an area designated for industrial uses and is surrounded by existing industrial developments to the east, south and west. To the north, Schaefer Avenue separates the singlefamily residential development from the Project. The Project will have no significant negative light, noise, and aesthetic impacts, as the building has been designed to meet all development and design requirements of the M1 zoning district, in which it is located;
f. The proposed location, size, and operating characteristics of the proposed Project will not be detrimental to the public interest, health, safety or general welfare, as the proposed Project consists of a mixed-use development with an industrial building and a food and beverage building, which is consistent with the M1 zoning district. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”; g. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Addendum satisfies the requirement of CEQA and the CEQA Guidelines (California Public Resources Code §§ 21000 et seq.; 14 Cal. Code Regs. §§ 15000 et seq.); and h. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.

2. PL24-0097 (Special Conditional Use Permit – Warehouse Building ≥ 50,000SF) a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s), in that the proposed use consists of an industrial building exceeding 50,000 square feet, which is permitted subject to approval of a SCUP. The use supports General Plan Goal LU-2 and Objective LU-2.1, which aims to foster the 17079
RESOLUTION NO. PC2025-012

Page 4 of 7 ends

development of new industrial uses that contributes to the City’s economic development, while ensuring such uses are planned and designed to prevent negative impacts on the health, safety, and welfare of residents; b. The subject site is physically suitable, including but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of the use have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development. Additionally, the proposed 158,548 square foot industrial building meets all requirements and development standards in the Zoning Ordinance;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as the 158,548 square foot industrial building will have direct access from one driveway off Schaefer Avenue and a second driveway off Oaks Avenue. Schaefer Avenue is designated as a primary arterial and truck route and Oaks Avenue is designated as an urban industrial collector, both streets designed to carry the volume of traffic typically generated by the use;
d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood. The Project is located within an area designated for industrial uses and is surrounded by existing industrial developments to the east, south and west. To the north, Schaefer Avenue, separates the single-family residential development from the use. The use will have no significant negative light, noise, and aesthetic impacts, as the building has been designed to meet all development and design requirements of the M1 zoning district, in which it is located. Additionally, the M1 zoning district is intended for industrial uses that are less intensive;
e. The proposed location, size, and operating characteristics of the proposed use will not be detrimental to the public interest, health, safety or general welfare, as the 158,548 square foot industrial building is allowed in the M1 zoning district, subject to the approval of a SCUP. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”;
f. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The 17180
RESOLUTION NO. PC2025-012

Page 5 of 7 ends

Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Addendum satisfies the requirement of CEQA and the CEQA Guidelines (California Public Resources Code §§ 21000 et seq.; 14 Cal. Code Regs. §§ 15000 et seq.); and g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.

3. PL24-0120 (Special Conditional Use Permit - Restaurant):
a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s); in that the proposed use consists of individual restaurants located within a multi-tenant building. The proposed use is permitted, subject to approval of a SCUP Furthermore, Objective LU-1.3 of the City’s General Plan encourages commercial development that will support and enhance vibrant commercial areas to serve existing neighborhoods with a combination of daily and specialty daily needs;
b. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of development have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as the restaurant building will have direct access from one driveway off Schaefer Avenue a second driveway off Oaks Avenue. Schaefer Avenue is designated as a primary arterial and Oaks Avenue is designated as an urban industrial collector, both streets designed to carry the volume of traffic typically generated by the proposed restaurant use;
d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood, in that restaurants in the M1 zoning district are allowed, subject to approval of a SCUP. The proposed food and beverage building is located within an area designated for industrial uses and is surrounded by existing industrial developments to the east, south and west.

The restaurant component is strategically located at the northeast corner of 17281
RESOLUTION NO. PC2025-012

Page 6 of 7 ends

the project site, serving as a transitional buffer between the single-family residential neighborhood, separated by Schaefer Avenue, and the larger warehouse industrial building to the south. The use will have no significant negative light, noise, and aesthetic impacts, as the building has been designed to meet all development and design requirements of the M1 zoning district, in which it is located;
e. The proposed location, size, and operating characteristics of the proposed use will not be detrimental to the public interest, health, safety or general welfare, as restaurant uses are allowed in the M1 zoning district, subject to the approval of a SCUP. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”; f. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Addendum satisfies the requirement of CEQA and the CEQA Guidelines (California Public Resources Code §§ 21000 et seq.; 14 Cal. Code Regs. §§ 15000 et seq.); and g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.

4. CEQA Findings. An Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared by LSA Associates, Inc. for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Planning Commission has considered the Addendum and Environmental Impact Report as part of its decision on this Project pursuant to Section 15164. The Planning Commission hereby finds that the Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Planning Commission hereby finds that the Project will not have any impacts that would require a revision to the EIR or any other additional environmental review.

5. Approval of PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval) and PL24-0120 (Special Conditional Use Permit). The Planning 17382
RESOLUTION NO. PC2025-012

Page 7 of 7 ends

Commission hereby approves PL24-0097 (Special Conditional Use Permit), PL24- 0098 (Site Approval) and PL24-0120 (Special Conditional Use Permit) subject to the Conditions of Approval attached hereto as Exhibit “A”. Applicant, including its successors and assigns, shall be responsible for implementing and complying with all conditions set forth in Exhibit “A”.

6. Actions by the Planning Commission Secretary. The Planning Commission Secretary is hereby directed to attest to the adoption of this Resolution as of the date set forth below and forthwith transmit a copy of this Resolution, by regular mail, to the Applicant at the address of record set forth in the Application.

PASSED, APPROVED, AND ADOPTED THIS 16
TH DAY OF JULY 2025.

PLANNING COMMISSION CHAIRPERSON
ATTEST:

SECRETARY, PLANNING COMMISSION
State of California )
County of San Bernardino ) §
City of Chino )
I hereby certify the foregoing Resolution was duly adopted by the Chino Planning Commission at a meeting held on the 16th day of July 2025 and entered in the minutes of said Commission.

AYES: COMMISSIONERS:

NOES: COMMISSIONERS:

ABSENT: COMMISSIONERS:

SECRETARY, PLANNING COMMISSION
Attachment: Exhibit “A” – Conditions of Approval
17483

EXHIBIT A

DEPARTMENTAL

CONDITIONS OF APPROVAL
DATE: July 16, 2025
PROJECT FILE NO.: PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval), and PL24-0120 (Special Conditional Use Permit) LOCATION: Southwest corner of Schaefer Avenue and Oaks Avenue (APN: 1021-052-04, -06, -09 and -11)
APPLICANT: Gateway Terminal LLC
The departments listed below have reviewed the above referenced application. Those departments marked with an “X” have required conditions of approval to be imposed on the project.

Development Services Department –
[X] Planning Division
[ ] ADA Accessibility Division
Public Works Department –
[X] Engineering Division
[ ] Traffic Division
[X] Chino Valley Independent Fire District
[ ] Police Department
[ ] Finance Department
[ ] Community Services, Parks & Recreation Department
17584

DEVELOPMENT SERVICES DEPARTMENT

PLANNING DIVISION CONDITIONS OF APPROVAL
DATE: July 16, 2025
PROJECT FILE NO.: PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval) and PL24-0120 (Special Conditional Use Permit) LOCATION: Southwest corner of Schaefer Avenue and Oaks Avenue (APN: 1021-052-04, -06, -09 and -11)
APPLICANT: Gateway Terminal LLC

1.0 TIME LIMITS:

1.1. The above referenced Site Approval and Special Conditional Use Permits shall expire on July 16, 2026, if building permits are not obtained and/or the approved uses have not commenced. The expiration date may be extended upon written request by the applicant on a City application form.

The request must be received by the Director of Development Services at least 30 days prior to expiration of the application.

1.2. Should any of the special conditionally permitted uses cease to exist for 180 or more consecutive days, then the permit shall be deemed null and void.

2.0 GENERAL REQUIREMENTS:

2.1. Failure to comply with any conditions of approval shall be deemed just cause for revocation of project approval by the Planning Commission and/or City Council.

2.2. The project shall proceed only in accordance with the approved plans on file with the Development Services Department, and with the conditions contained herein and the Chino Municipal Code.

2.3. The Director of Development Services shall have the authority to approve minor deviations in the site plan, architecture and/or landscape providing the total approved building area is not exceeded. If it is determined that the changes will be substantial, approval from the Planning Commission will be required.
17685

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

2.4. Approval of this request shall not waive compliance with any section of the Chino Municipal Code, or any other applicable City ordinances, or applicable specific plan provision.

2.5. Pursuant to Government Code Section 66020, upon approval of the project, the applicant has a 90-day period in which to protest the fees, dedications, reservation or other exaction imposed on this project through the conditions of approval.

2.6. In the event that any condition contained herein is determined to be invalid or legally unenforceable, all remaining conditions shall remain in force.

2.7. In the event that any condition imposing a fee, exaction, dedication, or other mitigation measure is challenged by the applicant and/or other parties in an action filed in a court of law, which action is brought within the time period provided for by law, this approval shall be suspended pending dismissal of such action, the expiration of the limitation period applicable to such action, or final resolution of such action. If any condition is invalidated by a court of law, the applicable section of the entire project shall be reviewed by the City and substitute conditions may be imposed.

2.8. The applicant shall indemnify the City and its elected boards, commissions, officers, agents and employees and will hold and save them and each of them harmless from any and all actions, claims, liabilities, losses, damages, penalties, obligations and expenses, including but not limited to attorneys’ fees and costs, (collectively “claims”) against the City for any such claims and shall be responsible for any judgment arising therefrom. The City shall provide the applicant with notice of the pendency of such action and shall request that the applicant defend such action. The applicant may utilize the City Attorney’s office or use legal counsel of its choosing, but shall reimburse the City for any necessary legal cost incurred by City, including for the City’s required participation in defense of the claims. The applicant shall provide a deposit in the amount of 100% of the City’s estimate, in its sole and absolute discretion, of the cost of litigation, including the cost of any award of attorney’s fees, and shall make additional deposits as requested by City to keep the deposit at such level. If the applicant fails to provide or maintain the deposit, the City may abandon the action and the applicant shall pay all costs resulting therefrom and City shall have no liability to the applicant.

2.9. The City of Chino has an executive contract with Waste Management for all solid waste collection and hauling services within the City. The applicant shall be responsible for making arrangements with Waste Management for disposal of any/all construction debris or trash generated 17786

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 as a result of this permit. Waste Management can be reached at 1-800 423-9986.

2.10. Any change in the project shall be reviewed by the Development Services Department for compliance with CEQA.

2.11. All proposed signs shall be designed to conform with the City’s Sign Code (Chino Municipal Code, Title 16 – Signs) and shall require separate application and approval by the Director of Development Services prior to installation.

2.12. Pursuant to Public Resources Code Section 21089 and Fish and Wildlife Code Section 711.4, the developer shall provide those fees marked [X] below in the form of a check made payable to the San Bernardino County Clerk of the Board of Supervisors within 5 days of Planning Commission approval. Project approval shall not be complete until the required fee(s) is (are) paid:
[X] $50 for the Notice of Determination filing fee.

3.0 PRIOR TO THE ISSUANCE OF A BUILDING AND/OR GRADING PERMIT:

3.1. The applicant/developer shall pay development impact fees at the established rate. Such fees may include, but not be limited to, new construction fee, park or open space fees, school fees, drainage fees, sewer fees, building permit and plan check fees.

3.2. Revised plans, incorporating all conditions of approval, shall be submitted and approved by the Director of Development Services.

3.3. All plans shall be coordinated for consistency.

3.4. The applicant/developer shall submit two sets of structural plans/construction documents. The plans shall include one set of structural calculations, one set of Title 24 energy calculations, and one soils report. The applicant/developer shall also submit the above documents in digital format to the Building Division once approved.

3.5. A construction management plan shall be submitted and approved by the Director of Development Services. The plan shall coordinate and address construction activities that may impact residents and/or surrounding businesses in adjacent areas. Elements of the plan shall contain, but not be limited to, the following:
a. Routing of construction equipment
b. Hours of operation
17887

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 c. Dust control
d. Vector control
e. Vehicle, equipment, and personnel staging
f. Pre-construction meetings
g. Contractor/subcontractor acknowledgement, obligations, and penalties h. Traffic control and coordination
i. Security and interim fencing
j. Signs posted on the site with a contact number for the job site construction manager and the City’s Code Enforcement Division. Signs shall measure at least four feet by eight feet and shall be posted along every street frontage. The developer shall contact the City immediately upon any change in contact numbers.
k. Building and landscape phasing. This plan shall show which buildings and landscaping will be completed in which phases, and how each completed phase will be closed off from phases under construction so as to minimize conflict between construction vehicles, construction equipment, employees, and residents, as applicable.

3.6. A precise wall plan identifying the design, location and construction details of all walls and fences shall be submitted and approved by the Planning and Building Divisions. All perimeter and street-facing walls, including retaining walls, shall be decorative in nature.

3.7. Prior to the issuance of any grading permit, detailed on-site landscaping and irrigation construction drawings along with a copy of the Planning Commission approved conceptual landscape plans and a copy of the conditions of approval shall be submitted for review and approval by the Director of Development Services. A grading permit will not be issued until the City’s outside plan checker has completed one review of detailed landscape and irrigation plans for the development. Payment of the Landscape & Irrigation Plan Review Fee shall be due at the time of submittal. Plans shall be prepared to comply with the City’s Water Efficient Landscape Ordinance, adopted on October 6, 2015, Ordinance No. 2015-008, meet the requirements for a Landscape Documentation Package in accordance with Section 20.19.030 of the Landscape Ordinance, and shall bear the seal of a landscape architect registered with the state of California. If the site includes areas proposed to be placed within a City-maintained Landscape Maintenance District, then the plans shall be prepared on City of Chino, Engineering Division base sheets, and shall bear the seal of a landscape architect registered with the state of California. Original mylars shall be submitted to the City upon approval of plans by the City Engineer.

3.7.1. To minimize damage to paved areas due to tree root growth, trees located within five (5) feet of any paved surface area, shall be 17988

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 provided with root barriers unless it can be demonstrated, to the satisfaction of the Planning Division, that the root growth characteristics of the type of tree proposed does not warrant their installation.

3.8. Approval of the conceptual landscape plan by the Planning Commission does not constitute final approval. The final landscape approval (during the plan check process and/or following installation) shall be subject to the review and approval of the City’s Landscape Architect Consultant and the Director of Development Services. The City Landscape Architect or Director of Development Services may require additional/fewer trees, shrubs, vines, and ground cover as necessary, based on final site conditions during the landscape plan check process or field review process in order to mitigate any site conditions that were not apparent during either the Planning Commission review or plan check review process.

3.9. All new ground-mounted utilities, including but not limited to cable television facilities, and telephone/fiber optic facilities, shall be undergrounded. Equipment that is not placed underground such as SCE transformers, backflow prevention devices, irrigation valves and controllers used for common landscape areas shall be placed in areas out of public view and sufficiently screened. The location and method of screening shall be reflected in a plan and shall be subject to the review and approval by the Director of Development Services.

3.10. All electrical panels and cabinets shall be completely screened. All electrical panels and cabinets shall be fully enclosed and integrated into and architecturally compatible with the building to the satisfaction of the Director of Development Services. The locations of the electrical panels and cabinets shall be reflected on a site plan and elevation(s) to be reviewed and approved by the Director of Development Services.

3.11. Prior to the issuance of a building permit, the approved grading plans shall be attached to the construction plan set. The project shall be built according to the plans approved by the Planning Commission on July 16, 2025, as prepared by Gateway Terminal LLC, O.C. Design & Engineering, Phil May Landscape Architecture and Pacific Consulting Group, Inc. Any substantial modification to the project shall require Planning Commission review and approval. If minor in nature, the modification may be reviewed and approved by the Development Services Director.

3.12. A detailed on-site exterior lighting plan shall be submitted and approved by the Director of Development Services. Plans shall be designed pursuant to Chino Municipal Code Section 20.10.090 (Outdoor Lighting) 18089

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 and shall identify fixture design, illumination (photometric), location, height and method of shielding, so as not to adversely affect adjacent properties.

3.13. Upon submittal of construction drawings to the Building Division for plan check review, all departmental conditions of approval for the project shall be included on the sheet following the title sheet, or the first sheet of the plans. A site plan shall also be attached to all sets of construction drawings. The condition shall be a minimum requirement for acceptance of construction drawings for the Building plan check review.

3.14. The applicant is required to contact the West Valley Mosquito and Vector Control District to determine if an inspection or field survey of potential vectors and their ectoparasites is necessary. If the District so determines, an inspection or field survey shall be conducted by the District, at the applicant’s expense, prior to demolition or grading in order to protect the health of and reduce the risk of neighboring residents to vector-borne diseases. Based on the inspection or survey results, the applicant shall take appropriate vector control methods as recommended by the District.

3.15. A Water Quality Management Plan shall be prepared in accordance with County of San Bernardino requirements and submitted and approved by the City.

3.16. No grading permits shall be issued until all applicable biological resource mitigation measures, identified in the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project, prepared by LSA Associates, Inc., dated June 2025, as they apply to the project area, have been complied with to the satisfaction of the Director of Development Services.

4.0 PRIOR TO START OF CONSTRUCTION:

4.1. A pre-construction meeting, scheduled with the Building Division, shall be held with all applicable City staff members, developer, contractor, superintendent, and all applicable subcontractors.

4.2. The final landscape and irrigation plans for the development shall be approved by the Director of Development Services.

4.3. The approved construction management plan shall be distributed to all contractors and subcontractors and shall be maintained on-site through the duration of construction.
18190

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

5.0 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:

5.1. All conditions of approval shall be completed to the satisfaction of the Director of Development Services.

5.2. The fee for review of the landscaping and irrigation plans by both the City and the City’s landscape architect shall be paid by the developer.

5.3. All landscaping and irrigation shall be installed in accordance with the approved Planning Commission plans on file with the Development Services Department, and irrigation systems fully operational. In addition, all hardscaped and landscaped areas shall be free of trash and debris.

5.4. A licensed landscape architect or contractor, or other licensed certified professional in a related field shall conduct a final field inspection and shall prepare a certificate of completion, which shall be filed with the Director of Development Services. The certificate of completion shall be prepared in accordance with Section 20.19.030.J of the Landscape Ordinance, and shall specifically indicate that plants were installed as specified by the landscape design plan, that the irrigation system was installed as specified by the irrigation design plan, and that an irrigation audit has been performed. All landscape and irrigation audits shall be conducted by a landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape.

5.5. A landscape maintenance program for the entire project site shall be reviewed and approved by the Director of Development Services. The maintenance program shall include general landscape maintenance provisions for pruning, trimming, the replacement of any dead, decayed, or diseased vegetation, ongoing weed abatement, and replacement/repair of the irrigation system, when necessary. The landscape maintenance program shall be included with the contract with the landscape maintenance company to ensure they implement the maintenance program. In addition, the maintenance program should include provisions for periodic inspections to ensure the irrigation system is working properly, and all landscaping is being properly maintained.

5.6. Prior to issuance of a certificate of occupancy for the final unit, any temporary sales and/or construction office buildings/trailers shall be removed from the site.

5.7. The project site shall be clean and free of trash and construction debris, and all construction equipment shall be removed from the site. 18291

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

6.0 ENVIRONMENTAL REQUIREMENTS & MITIGATION MEASURES:

6.1. Comply with all mitigation measures identified in the attached Mitigation Monitoring and Reporting Program contained within the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project and attached as Exhibit “A” to the conditions of approval, which identifies each environmental mitigation measure, the time in which it will be implemented and the responsible party for monitoring its implementation.

7.0 OTHER REQUIREMENTS:

7.1. The applicant shall disclose to all potential tenants or owners of units or buildings that the businesses/uses must be consistent with the standards of the land use designation/zoning district in which the project site is located.

7.2. All existing buildings or structures on the project site that are proposed to be demolished shall be removed or razed within 90 days of the existing church vacating the site or issuance of a grading permit, whichever occurs first. The Director of Development Services may approve an extension of time to complete the demolition, based on evidence that the applicant has exercised reasonable progress. Approval of this application shall be deemed null and void upon failure of the applicant to comply with this condition within the aforementioned time periods.

7.3. The project site shall be cleared of all trash, debris, weeds, and other discarded items within two weeks of Planning Commission approval.

Approval of this application shall be deemed null and void upon failure of the applicant to comply with this condition within the aforementioned time period.

7.4. A coating that will facilitate the removal of graffiti shall be applied over the complete height of one side/both sides of walls and/or fences, and to a height of eight feet on building walls. If a coating is not provided, the owner of the property shall paint the buildings and/or walls to remove graffiti within 72 hours of notice.

7.5. All signs, including subdivision and/or realty signs proposed for this development shall be designed to conform to the Sign Ordinance and shall require separate application and approval by the Planning and Building Divisions prior to installation.
18392

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

7.6. Building and Site Design:

7.6.1. Exterior building color shall be reviewed and approved by the Director of Development Services. Colors shall be coordinated between structures, utilizing compatible hues and intensities.

Final review and approval of paint colors utilizing a color test may be required prior to painting any structure, if determined necessary in the field by the Director of Development Services.

7.6.2. All building drainage gutters, downspouts, vents, etc., located on the exterior walls shall be architecturally compatible with the exterior building design and color, to the satisfaction of the Director of Development Services, or shall be completely concealed from view. They shall not be located on the exterior of building walls near office areas or other prominent locations on the building(s).

7.6.3. All new mechanical equipment and appurtenances of any type (including, but not limited to, electrical cabinets, HVAC equipment, skylights, stack vents or fans) whether located on rooftops, ground level or anywhere on the building structure, shall be completely screened so as not to be visible from any public street and/or adjacent property, subject to review and approval by the Director of Development Services. The parapet wall should serve as the primary method of screening, or the facilities shall be enclosed within the structure of the building. Such enclosure of facilities shall be of compatible design related to building structure for which such facilities are intended to serve.

7.6.4. Returns for parapet walls shall not be visible from public view and shall be evaluated in the field during construction, and modified if necessary so as not to be visible. All parapet returns shall be a minimum of 4 feet deep.

7.6.5. New ladders for roof access shall be mounted on the inside of the building or shall be completely concealed from view for commercial and industrial projects.

7.6.6. All new overhead doors, mechanical doors and/or man doors shall be color coordinated with the building.

7.6.7. An outdoor employee break area shall be provided at the northwest corner of the project site, in front of the industrial warehouse building. This area shall be provided with seating, tables, enhanced paving treatments, hose bibs, decorative trash 18493

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 receptacles, a shade trellis structure, and shade trees, to the satisfaction of the Director of Development Services.

7.6.8. All landscaping shall be designed and installed in accordance with Section 20.19 of the Chino Municipal Code.

7.7. Parking and Lighting:

7.7.1. All exterior lighting fixtures shall be installed in accordance with plans on file with the Development Services Department and shall be fully operational prior to occupancy.

7.7.2. All building-mounted light fixtures within public areas shall be decorative in nature and architecturally compatible with the building. Building-mounted light fixtures shall be reviewed and approved by the Director of Development Services prior to installation. “Wall-paks” or other standardized exterior lighting shall not be permitted within public areas.

7.7.3. All parking and loading areas shall be paved and double-striped in accordance with plans on file with the Development Services Department, Chino Municipal Code Chapter 20.18 (Parking) and the disabled parking and accessibility requirements of state law (see the CalDAG—California Disabled Accessibility Guidebook).

7.7.4. Drive surfaces contiguous with planter areas shall have a 6-inch raised curb separation.

7.7.5. All parking spaces, aisles, entrances and exits shall be doublestriped per City standards.

7.7.6. All parking spaces for compact cars shall be clearly identified as "Compact Car Only" on the pavement, at the opening of the space. Compact parking spaces shall be reasonably distributed throughout the parking area, subject to review and approval by the Director of Development Services.

7.8. Refuse and Recycling:

7.8.1. Separate receptacles (bins) for the collection of refuse, recyclable, and organics materials shall be provided. An adequate number of bins to allow for the collection of refuse recyclable, and organic materials generated by the development shall be provided.
18594

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

7.8.2. Refuse, recyclable, and organics materials bins shall be enclosed by a 6-foot-high (1.83 m) wall with a solid roof that is designed to be architecturally compatible with the building(s), with solid view obstructing gates fitted with self-closing door devices and be designed with cane bolts in front of the block walls to secure the gates when in the open position. The gates should also be equipped with rod locks and corresponding rod holes in both the open and closed gate positions. Bins containing recyclable materials shall be provided protection from adverse environmental conditions that might render the collection materials
unmarketable.

7.8.3. No refuse/recycling/organic enclosure shall be located within any required setback area.

7.8.4. All refuse, recyclable and organic material bin enclosures not located in private yard areas shall be screened with landscaping on all sides, with the exception of the gate area. All sides of the enclosure, with the exception of the gate area, shall be surrounded by a minimum 18” wide planter area for the purpose of providing landscape material.

7.8.5. Refuse storage, recycling and organic areas shall not be used for the storage of materials other than that for which it is designed (refuse, recyclable and organic materials). The premises shall be kept in a neat and orderly condition, and in good repair and appearance at all times.

7.9. Phased Projects:

7.9.1. All required street improvements and a minimum of 10 feet of landscaping on private property shall be installed in conjunction with the construction of Phase 1 of the proposed project. The landscaping within this area shall be included in the landscape maintenance program.

7.9.2. Prior to the first occupancy permit, all undeveloped building pads shall be improved according to the following requirements:

7.9.3. For an undeveloped building pad located adjacent to the street or main drive aisle of the site, the area shall be landscaped with a planting scheme consisting of a low-maintenance drought tolerant erosion control mix of Cucamonga brome (20 lbs/acre), tomcat clover (4 lbs/acre and small fescue (8 lbs/acre) at a minimum of 85% PLS (pure live seed). The irrigation system shall consist of 18695

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 low precipitation sprinkler heads and/or drip system. In addition, shrubs may be required to provide screening from the street, if determined needed by the Director of Development Services.

Said treatment shall be incorporated into the required landscape and irrigation plans.

7.9.4. For a larger phased area located on the interior of the site, a construction fence/green screen may be provided in lieu of the landscape treatment. The fence shall be maintained in good condition at all times.

7.10. Chino Climate Action Plan:

7.10.1. Per Section 15.45.070 of the Chino Municipal Code, demonstrate consistency with the Chino Climate Action Plan by implementing one of the following three options:
a) Exceed the mandatory California Energy Code Title 24, Part 6 standards in effect at the time of application submittal by 5%; or b) Achieve an equivalent reduction through voluntary measures in the California Green Building Standards Code, Title 24, Part 11 (CALGreen) in effect at the time of application submittal; or c) Provide other equivalent greenhouse gas (GHG) reductions through measures including but not limited to, non-vehicle transportation infrastructure, transit, ZEV (zero emission vehicle) infrastructure or other incentives, waste diversion, water conservation, tree planting, renewable energy option packages, or any combination of these or other measures such that GHG emissions are reduced by 0.74 MT CO2e per residential dwelling unit per year and/or per TSF of commercial/industrial use per year.

Applicants that choose Option a described above will be required to verify that their project meets the 5% improvement above the mandatory standards through the appropriate certificate of compliance form for residential construction (CF-1R) or for commercial/industrial construction (PERF-1C). Applicants that choose Options b or c described above will be required to utilize the GHG Performance Standard Checklist developed by the City, or provide other valid documentation, such as CalEEMod or other methodologies, as verified by the Director of Development Services to demonstrate the required GHG reductions consistent with the City's CAP.
18796

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

8.0 CONSTRUCTION SITE SECURITY:

8.1. Each site shall be completely encircled by a minimum 6' tall securityquality chain link fence once precise grading has been completed or as determined by the Deputy Director of Development Services.

8.2. Tennis court or similar screening material shall be securely attached for the length of the fence, excluding gates and 10' on either side of gates.

8.3. Each site shall have only one entry/exit gate, or as approved by the Planning Division.

8.4. Gate hinge pins shall be spot-welded or altered in such a way as to prevent easy removal.

8.5. Each gate shall have a casehardened lock and chain, or other equivalent security hardware.

8.6. “No Trespassing” signs shall be attached to the exterior of the fence at a minimum distance of a third of a mile and at all entrances.

8.7. On or near the exterior of each gate will be a sign with the address of the site in no less than 6" letters. Both the number and street name will be listed on the sign. The address posted will be used for the entire site until the fence is removed and individual addresses assigned.

8.8. Office trailers and tool bins shall be placed adjacent to gates inside the property to allow observation from outside.

8.9. Lighting on trailers and bins is desirable but shall be directed into the property so as not to impede outside observation or endanger nearby traffic with glare.

8.10. Tool bins shall be secured with casehardened locks, preferably with lock guards.

8.11. A sign stating that theft is not acceptable on the site and will be reported to the police, or wording to that effect, will be displayed prominently near each entrance.

8.12. Each site will have an assigned Crime Prevention Manager who is responsible for the following:
a. Providing his/her name and 24-hour telephone access number to the Chino Police Department.
18897

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 b. Have available at all times the names and 24-hour contact numbers for all subcontractors.
c. Have the authority to speak for the development/owners on matters concerning trespassing and other criminal matters.
d. Complete routine fence inspections and arrange for prompt repairs or removal of any damage, graffiti, or loose screening. e. Ensure that no work or maintenance of construction equipment is being performed on the site between 8 PM and 7 AM.
f. Ensure that all above security requirements are complied with, and that all security hardware, fencing, and lighting are maintained in working order.
g. Ensure that thefts are immediately reported to the police department and that reasonable steps are taken, if evident, to prevent future similar incidents.

9.0 THE APPROVED USES SHALL BE OPERATED IN ACCORDANCE WITH THE FOLLOWING:

9.1. All operations shall not create a nuisance due to noise, odor, dust, mud, smoke, steam, vibration or other similar causes.

9.2. The operation or activity shall not cause the emission of any smoke, fly ash, dust, fumes, vapors, gases, or other forms of air pollution that can cause damage to human health, vegetation, or other forms of air pollution that can cause excessive soiling on any other parcel. No emission shall be permitted which exceeds the requirements of the South Coast Air Quality Management District or the requirements of any Air Quality Plan adopted by the City of Chino.

9.3. The operation or activity shall not emit odorous gases or other odorous matter in such quantities as to be dangerous, injurious, noxious, or otherwise objectionable to a level that is detectable with or without the aid of instruments at or beyond the project site boundary.

9.4. The operation shall not discharge, at any point, into any public or private street, public sewer, storm drain, private stream, body of water, or into the ground, any material which can contaminate any water supply, interfere with bacteriological processes in sewerage treatment, or otherwise cause the emission of dangerous or offensive elements, except in accordance with the standards approved by the California Department of Public Health, or any other federal, state or local government agency.

9.5. No operation or activity shall emit heat or cold that would cause a temperature increase or decrease on any adjacent parcel in excess of 100F (5.560C).
18998

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

9.6. No operation or activity shall cause any impermissible source of electronic disturbance that adversely affects persons or the operation of any equipment on any other parcel that is not in conformance with the regulations of the Federal Communications Commission (FCC).

Impermissible interference for the purposes of this document shall mean any interference that violates the rules and regulations of the FCC and/or the Communications Act of 1934, as amended.

9.7. No operation or activity shall be permitted to cause a steady state, earthborne oscillation which is continuous and occurring more frequently than 100 times per minute beyond the project site. Ground vibration caused by moving vehicles, trains, aircraft, or temporary construction or demolition is exempted from this requirement.

9.8. Noise emanating from the project site, and which is received by adjacent land uses, shall not exceed the levels specified below, except that loudspeakers, bells, gongs, buzzers or other noise attention or attracting devices shall not exceed a maximum daytime dBA level of 60 and nighttime dBA of 40, measured anywhere beyond the boundaries of the property within which the noise is created.

Attachment:

Exhibit “A” – Mitigation Monitoring and Reporting Program Maximum Time of
Exposure
Noise
Metric
Noise Level Not To Be Exceeded
7 a.m. to 10 p.m. 10 p.m. to 7 a.m.
30 Minutes/Hour L50 55 dBA 50 dBA
15 Minutes/Hour L25 60 dBA 55 dBA
5 Minutes/Hour L8.3 65 dBA 60 dBA
One Minute/Hour L1.7 70 dBA 65 dBA
Any Period of Time Lmax 75 Dba 70 dBA
19099

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 1
This Mitigation Monitoring and Reporting Program has been prepared for use in implementing mitigation for the:

Chino Gateway Terminal Project
Special Conditional Use Permits (PL24-0097 and PL24-0120), Site Approval (PL24-0098) The program has been prepared in compliance with State law and Addendum to The City of Chino General Plan Environmental Impact Report (State Clearinghouse No. 2008091064) prepared for the project by the City of Chino (City).

The California Environmental Quality Act (CEQA) requires adoption of a reporting or monitoring program for those measures placed on a project to mitigate or avoid significant effects on the environment (Public Resource Code Section 21081.6). The law states the reporting or monitoring program shall be designed to ensure compliance during project implementation.

The monitoring program contains the following elements:
1) The mitigation measures are recorded with the action and procedure necessary to ensure compliance. In some instances, one action may be used to verify implementation of several mitigation measures.
2) A procedure for compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported.
3) The program has been designed to be flexible. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. As changes are made, new monitoring compliance procedures and records will be developed and incorporated into the program.

This Mitigation Monitoring and Reporting Program includes mitigation identified in The City of Chino General Plan Environmental Impact Report (State Clearinghouse No. 2008091064).

MITIGATION MONITORING AND RESPONSIBILITIES
As the Lead Agency, the City is responsible for ensuring full compliance with the mitigation measures adopted for the proposed project. The City shall monitor and report on all mitigation activities.

Mitigation measures shall be implemented at different stages of development throughout the project site. In this regard, the responsibilities for implementation have been assigned to the Applicant, City, Contractor, or a combination thereof. If, during the course of project implementation, any of the mitigation measures identified herein cannot be successfully implemented, the City shall be immediately informed, and the City shall then inform any affected responsible agencies. The City, in conjunction with any affected responsible agencies, shall then determine if modification to the project is required and/or whether alternative mitigation is appropriate.

REGULATORY COMPLIANCE MEASURES
Regulatory Compliance Measures are presented in instances where the proposed project would not create a significant impact but would be required to adhere to regulatory requirements in order to ensure impacts do not become significant. Regulatory Compliance Measures outline compliance with various federal, State, and/or local acts, laws, rules, regulations, municipal codes, policies, etc. 100 191

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 2

THIS PAGE INTENTIONALLY LEFT BLANK
101 192

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 3

MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 13, 2025
Mitigation Measure No. / Implementing Action
Responsible
for
Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
V.1. AESTHETICS
Since there are no significant impacts related to aesthetics as a result of the project, no mitigation measures are required.

V.2. AGRICULTURAL RESOURCES
Since there are no significant impacts related to agricultural resources as a result of the project, no mitigation measures are required.

V.3. AIR QUALITY AND GREENHOUS EGAS EMISSIONS
Since there are no significant impacts related to air quality and greenhouse gas emissions as a result of the project, no mitigation measures are required.

V.4. BIOLOGICAL RESOURCES
Since there are no significant impacts related to biological resources as a result of the project, no mitigation measures are required.

V.5. CULTURAL RESOURCES
Since there are no significant impacts related to cultural resources as a result of the project, no mitigation measures are required.

V.6. GEOLOGY/SOILS and MINERAL RESOURCES
Since there are no significant impacts related to geology/soils and mineral resources as a result of the project, no mitigation measures are required.

V.7. HAZARDS & HAZARDOUS MATERIALS
Since there are no significant impacts related to hazards and hazardous materials as a result of the project, no mitigation measures are required.

V.8. HYDROLOGY/WATER QUALITY
Since there are no significant impacts related to hydrology/water quality as a result of the project, no mitigation measures are required.

V.9. LAND USE and PLANNING
Since there are no significant impacts related to land use and planning as a result of the project, no mitigation measures are required. 102 193

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 4
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 13, 2025
Mitigation Measure No. / Implementing Action
Responsible
for
Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
V.10. NOISE
Since there are no significant impacts related to noise as a result of the project, no mitigation measures are required.

V.11. POPULATION/HOUSING
Since there are no significant impacts related to population/housing as a result of the project, no mitigation measures are required.

V.12. PARKS and PUBLIC SERVICES
Since there are no significant impacts related to parks and public services as a result of the project, no mitigation measures are required.

V.13. TRANSPORTATION/TRAFFIC
Since there are no significant impacts related to transportation/traffic as a result of the project, no mitigation measures are required.

V.14. UTILITY SYSTEMS and INFRASTRUCTURE
Since there are no significant impacts related to utility systems and infrastructure as a result of the project, no mitigation measures are required.

V.15. ENERGY
Since there are no significant impacts related to energy as a result of the project, no mitigation measures are required.

V.16. VEHICLE MILES TRAVELED
Since there are no significant impacts related to vehicle miles traveled as a result of the project, no mitigation measures are required.

V.17. TRIBAL CULTURAL RESOURCES
Since there are no significant impacts related to tribal cultural resources as a result of the project, no mitigation measures are required.

V.18. WILDFIRE
Since there are no significant impacts related to wildfire as a result of the project, no mitigation measures are required. 103 194

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 5

REGULATORY COMPLIANCE MEASURES
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 16, 2025
Regulatory Compliance Measure / Implementing
Action
Responsible
for Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
V.4. BIOLOGICAL RESOURCES
REGUATORY COMPLIANCE MEASURE BIO-1: A
preconstruction survey for burrowing will be conducted
within 30 days prior to initial ground disturbance. If
burrowing owl is found on the site, the developer will
consult with California Department of Fish and Wildlife (CDFW) and relocate the owls in accordance with CDFW
burrowing owl relocation protocols, including the
creation of artificial burrows.

City of Chino
Director of
Development
Services, or
designee.

Within 30 days prior to initial
ground disturbance and during
construction.

Evidence to the City a
qualified biologist is
retained, the required
pre-construction survey
has been completed, and,
if necessary, appropriate
consultation with the
CDFW and relocation of
owls in accordance with
CDFW burrowing owl
relocation protocols,
including the creation of
artificial burrows, has
occurred.

Withhold
grading permit
and/or issuance
of a stop work
order.

REGUATORY COMPLIANCE MEASURE BIO-2: If tree
removal is to be conducted during the nesting season
(February through August), a preconstruction nesting
bird survey shall be conducted by a qualified avian
biologist to ensure that active bird nests would not be disturbed or destroyed. The survey shall be completed no more than three days prior to initial clearing of
vegetation. The nesting bird survey shall include the
project site and adjacent areas where project activities have the potential to affect active nests, either directly or indirectly, due to construction activity, noise, human
activity, or ground disturbance.

If an active nest is identified, a qualified avian biologist shall establish an appropriately sized non-disturbance
City of Chino
Director of
Development
Services, or
designee.

No more than three days prior
to initial clearing of vegetation
if tree removal is to be
conducted during the nesting
season (February through
August).

Evidence to the City a
qualified avian biologist is
retained, the required
pre-construction survey
has been completed, and,
if necessary, appropriate
buffers have been
implemented and
enforced until the nest is
deemed inactive by the
qualified avian biologist.

Withhold
grading permit
and/or issuance
of a stop work
order.
104 195

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 6
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 16, 2025
Regulatory Compliance Measure / Implementing
Action
Responsible
for Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
buffer between 100 and 300 feet (500 feet for raptors)
around the nest, depending on bird species, behavior,
and level of construction activity, using flagging or
staking. Construction activities shall not occur within any non-disturbance buffer zones until the nest is deemed
inactive by the qualified avian biologist.
105 196

PUBLIC WORKS CONDITIONS OF APPROVAL
Reviewed/Approved By: JP Date: 7/1/2025
Template Rev. 2/11/2025
PROJECT NO. PL24-0097 (SCUP)/-0098 (SA)/-0120(SCUP)
DATE: July 1, 2025 PC MEETING DATE: July 16, 2025
PROJECT DESCRIPTION: Proposal for a new mixed use development of two buildings: a building with 158,548 sq ft of industrial warehouse uses and 3,520 sq ft of food and beverage use building. Existing structures, totaling 17,716 SF, are to be demolished. Four (4) lots will be merged into two (2) lots.

PROJECT LOCATION: 5849 Schaefer Avenue
APPLICANT: Gateway Terminal LLC PROJECT ENGINEER: Daniel Aguirre

PRIOR TO THE THREE MAJOR DEVELOPMENT EVENTS, THE APPLICANT SHALL SATISFY AND FULFILL ALL CONDITIONS OUTLINED BELOW. FAILURE TO COMPLY WITH ANY CONDITIONS OF

APPROVAL SHALL BE DEEMED JUST CAUSE FOR REVOCATION OF PROJECT APPROVAL BY THE PLANNING COMMISSION. HOWEVER, THE PUBLIC WORKS DIRECTOR SHALL HAVE THE

AUTHORITY TO APPROVE MINOR DEVIATIONS IN THE CONDITIONS OF APPROVAL, AND ALL PLANS INCLUDING THE CONSTRUCTION DRAWINGS.

1.0 PRIOR TO ISSUANCE OF BUILDING OR CONSTRUCTION PERMITS:

1.1. All required plans and studies shall be prepared by a Registered Professional Engineer and submitted to the Project Engineer for review and approval. All project plans must be approved by the City Engineer's office before a Building Permit will be issued. All maps, studies, calculation sheets, reports, etc. must be on and/or folded in an 11-inch by 8½-inch standard format.

1.2. Make the following dedications:

Street Name Distance Direction From C/L
Oaks Ave 33-ft total from CL to ROW West
(3-ft dedication)

1.2a Dedicate to the City of Chino, a corner cutoff dedication at the southwest corner of Schaefer Ave. and Oaks Ave., per the City’s Municipal Code.

1.2b Prepare and record necessary drainage easements to implement the project in accordance with drainage law.

1.3. Apply for and record a Lot Merger (LM) prior to the issuance of building permits. Record a Conforming Deed with the County of San Bernardino within six months of the recordation of the LM to conform the new legal description. Submit a copy of the recorded Conforming Deed to the Public Works Department.

1.4. Prepare and submit a drainage study, including supporting hydraulic and hydrological data to the project engineer for approval. The study shall confirm or recommend changes to the City’s adopted Master Drainage Plan by identifying off-site and on-site storm water runoff impact resulting from build-out of permitted General Plan land uses. In addition, the study shall identify the project’s contribution and shall provide locations and sizes of catchments and system connection points and all downstream drainage mitigation measures.
106 197
PROJECT NO. PL 24-0098 (SA) 2 July 1, 2025

1.5. Prepare and submit a final grading plan showing building footprints, pad elevations, finished grades, drainage routes, retaining walls, erosion control, slope easements and other pertinent information in accordance with Appendix J of the California Building Code, latest edition.

1.6. Provide a certificate, from a Registered Civil Engineer, certifying that the finished grading has been completed in accordance with the City approved grading plan.

1.7. Submit a soils/geology report in accordance with Appendix J of the California Building Code, latest edition to the project engineer for review and approval.

1.8. Design per City Standards and construct full public improvements for all impacted and interior streets/facilities in accordance with City Code, Standards and Specifications. Such public improvements shall include, but not be limited to, the following (1):

Street Names
Schaefer
Ave
Oaks
Ave
Curb & Gutter (Offset from Centerline) 36’ 22’
Sidewalk (Width) 5’ (2) 5’ (2)
Asphalt Concrete Pavement on Aggregate
Base (Width from Centerline)
Asphalt Concrete Overlay (3) X X
Street Lights (4) X X
Median Island and Landscaping
Parkway Landscaping (5) X X
Striping and Traffic Controls (6) X X
Traffic Signal Interconnect
Conduit System for CATV
Sewer (7) X
Storm Drain X
Domestic Water (8) X X
Recycled Water
Fire Hydrants as required by CVIFD (9) X X
Driveways approaches (10) X X

1. The public improvements listed above are required along the south side of Schaefer Avenue and the west side of Oaks Avenue as specified in our municipal code and per the City of Chino’s General Plan. All required street improvements should follow the new City standard for street trenching backfill and repair. Repair all damage to existing public improvements due to the proposed construction activities and as requested by the Public Works Inspector.

2. The sidewalk shall be extended along the project frontage on Schaefer Ave to the existing catch basin located near the northwesterly corner of the project site. ADA ramps shall be constructed at the southwest and southeast corners of Schaefer and Oaks to align with ADA standards.

3. Grind and overlay a minimum of 2 inches of the existing asphalt pavement along the project frontage in accordance with City of Chino standards. The limits of work shall extend to the street centerline along Oaks Avenue. The extent of asphalt pavement along Schaefer Avenue shall be determined based on the limits shown on the approved precise grading plan, including any areas impacted by new driveway installation, utility connections, or accessibility improvements.

4. Streetlights shall be installed per City of Chino standards and shall utilize an unmetered service pedestal.

5. The parkway maintenance shall be the responsibility of the property owner.

6. Extent of the signing & striping plan shall be dictated by the City Traffic Engineer.

7. Abandon unused sewer service(s) where applicable, per City standards. 107 198
PROJECT NO. PL 24-0098 (SA) 3 July 1, 2025

8. Provide new water meters and services and abandon unused water meters and services where applicable, per City standards.

9. All existing fire hydrants that require relocation will need to be upgraded to the latest model per City of Chino standards.

10. All proposed driveway approaches shall be constructed per City Std. No. 250 with 5-ft sidewalks.

Minimum width shall be 30-ft. Minimum radii per City and Chino Valley Independent Fire District (CVIFD) requirements.

1.9. All improvements shall comply with federal, state, and local accessibility regulations and standards. a. The review or approval of plans and specifications by the City does not permit the violation of any section of the federal law, state law, building code, or local ordinance. b. Where accessibility standards are contradictory, the provision that provides the most accessible (restrictive) condition shall apply.
c. Where the project’s conditions of approval conflict with accessibility regulations and standards, the prevailing provision shall be determined by City’s Accessibility Coordinator and City Engineer.

Pedestrian facilities (privately or publicly owned) that are open to the public shall comply with the City's Policy on Accessible Pedestrian Facilities, accessibility standards in the CBC, and ADA regulations at Part 36 of Title 28, which include the 2010 (ADA) Standards.

Accessibility of existing and proposed building improvements will be evaluated by the City’s building department. Those comments and requests are in addition to those provided herein.

1.10. Design and install a monitoring manhole (per City Standard No. 530) on each domestic sewer lateral connection from any industrial building into the City's main sewer or into a private sewer main that is tributary to the City's main sewer. In addition, design and install a sampling Wye on a stubbedout sewer lateral connection into the main sewer for each industrial building in this development.

1.11. Execute a Public Improvement Agreement and submit security in an amount acceptable to the City Engineer to guarantee construction of the public improvements listed in 1.8. All security must be accessible to the City at any time and in a form acceptable to the City Engineer, pursuant to Government Code, Section 66499.

1.12. Complete and file the petition for annexation of your project property to the City's Landscape and Street Lighting Maintenance District MD 2002-01.

1.13. Annex into the current services special tax community facilities district of the City (the “City Services CFD”) through the submission of an application to the City’s Finance Department along with the payment of $11,000.00 plus the per parcel fee, for the City’s outside costs of the annexation process, or (II) form a new City community facilities district with a services special tax component commensurate with the City Services CFD, or (III) provide a lump sum payment to the City which, based on current interest rate conditions, is projected to finance in perpetuity the same services projected to be provided through annexation into the City Services CFD. Upon completion of the annexation, an annual special tax will be assessed on the property tax bill to each Assessor Parcel at an established rate set by the City Services CFD document entitled “Rate and Method of Apportionment” available for review in the CFD Annual Report located at:
https://www.cityofchino.org/222/Community-Facilities-District-Mello-Roos This annual tax is used to fund Police, Fire and other municipal services provided to residents and businesses in the general City.
108 199
PROJECT NO. PL 24-0098 (SA) 4 July 1, 2025

1.14. Obtain design and plan approval from appropriate utility companies for undergrounding all utility lines adjoining and interior to the project, including power lines of 34.5kV or less in accordance with City Code, Chapter 13.32.

1.15. Comply with all applicable requirements of the City Code.

1.16. The project must ensure that all pedestrian facilities (private or publicly owned) that are open to the public shall comply with accessibility standards in the City’s Policy on Accessible Pedestrian Facilities, the current edition of the CBC in effect at the time of building permit issuance or, if no permit, the date construction commences, and Part 36 of Title 28 of the Americans with Disabilities Act (ADA) regulations, which include the 2010 ADA Standards. This includes the following structures and facilities:
a. Sidewalks and walks (public right of way sidewalk, walks within the development); b. Curb ramps (should be directional with one curb ramp provided for each pedestrian crossing and shall comply with the City’ Policy on Accessible Pedestrian Facilities); c. Pedestrian crossings at driveways; and
d. Crosswalks (marked, unmarked, signalized)

1.17. Existing pedestrian facilities on the frontage of the development, open to the public within the development, shall be evaluated for accessibility. The street frontage includes all adjacent pedestrian facilities, created by, extended from, or connected to any required or provided sidewalks improvements. The frontage may include sidewalks, curb ramps, connecting crosswalks (marked and unmarked), and other associated pedestrian facilities (on-street parking space, etc.). a. The following existing improvements shall be made compliant with accessibility regulations as a part of this project:
i. sidewalks/walks
ii. curb ramps near the southwest and southeast corners of Schaefer Ave and Oaks Ave iii. crosswalk pavement and associated pedestrian facilities (pedestrian push buttons, maneuvering space, clear space)
iv. driveway approaches crossings
v. parking space
b. Improvements that are non-compliant with the accessibility standards in effect at the time of construction or alteration, shall be brought up to current accessibility standards. This work shall be incorporated into the scope of this project and shall be completed prior to acceptance by the City.
c. Improvements that are compliant with the accessibility standards in effect at the time of construction, shall be documented on a separate construction plan with detailed specifications (running and cross slopes of all pedestrian walking surfaces, locations, dimensions and slopes of maneuvering spaces and landings, width of sidewalk, clear width and vertical clearance from obstructions). The accessibility of existing improvements will be verified by City inspection staff upon completion of the project. Discrepancies between documented existing conditions and existing conditions as measured by City staff shall be remediated and brought up to accessibility standards as part of the project.

1.18. Pay all applicable fees pursuant to City Code including, but not limited to, the Development Impact Fees (DIF) and Sewage Facilities Development Fee (SFDF). The actual amount of fees due to the City will be based on the fee schedule in place on the date that the fees are due, or the date that they are paid, whichever occurs last. The fee amount stated in this notice is subject to change based on (1) annual adjustments for inflation, pursuant to Chino Municipal Code Section 3.40.100 109 200
PROJECT NO. PL 24-0098 (SA) 5 July 1, 2025
or 3.45.100, (2) revisions to the Chino Municipal Code, and (3) updates to the fee studies and nexus reports adopted by the City.

Developer is solely responsible for remaining informed about changes in the fee amounts. City shall have no obligation to inform Developer of changes in the fee amounts unless Developer requests notice of such changes, pursuant to Government Code Section 66019(b) and Chino Municipal Code Section 3.40.080(B) or 3.45.080(B).

1.19. All projects developing one (1) acre or more of total land area, or which are part of a larger phased development that will disturb one acre of land, are required to obtain coverage under the State Water Resources Control Board’s (SWRCB) General Permit for storm water discharges associated with construction activity. Proof of filing a Notice of Intent (NOI) with the SWRCB for coverage under this permit is required. A copy of the Waste Discharger’s Identification Number (WDID), issued by the SWRCB, must be submitted to the Project Engineer prior to issuance of grading permits. More detailed information regarding this General Permit, applicable fee information and the necessary forms to complete the NOI are available by calling (916) 341-5537 or on the SWRCB web site at:
http://www.swrcb.ca.gov/water_issues/programs/stormwater/constpermits.shtml.

1.20. Pursuant to Santa Ana Regional Water Quality Control Board Order Number R8-2010-0036, NPDES Permit No. CAS618036, prepare a project-specific Water Quality Management Plan (WQMP) and submit to the project engineer for review and approval. To address NPDES Permit requirements to the maximum extent practicable, the project shall be designed to specify preferential use of Low Impact Development Best Management Practices that reduce pollutants and runoff volume through structural measures (e.g., infiltration, harvesting, and bio-treatment) and non-structural measures (e.g., preserving natural areas, clustering development, and reducing impervious areas). The WQMP shall conform to the requirements of the San Bernardino County Stormwater Program, 2013 WQMP Technical Guidance Document and include the Trash Order Implementation Plan requirements.

1.21. Any future maintenance and repair of sewer laterals, except for the portion of lateral located within the public right-of-way or public easement, and domestic water or fire service laterals to the project site shall be the sole responsibility of the applicant/property owner in accordance with City Code, Chapter 13.04.175 and 13.12.150.

1.22. City staff shall determine the type of water (potable or recycled) to be used for grading operations, dust control activities, and common area/public landscape irrigation at the time of permit issuance.

1.23. All public street corners shall have a minimum curb radii per City Code, Chapter 19.06 and City Standards and Specifications.

1.24. Provide adequate sight distance per City Standard No. 865 for each project driveway and at all intersections. Landscaping type and height shall be maintained to ensure sight distance requirements are perpetuated.

1.25. Comply with all requirements of the Traffic Impact Analysis (TIA) dated May 21, 2025 including participation in fair share contributions (if applicable) and construction of required improvements.

1.26. If the design of the proposed curb ramps requires modifications to the existing traffic signal at the intersection of Schaefer Avenue and Oaks Avenue, the developer shall be responsible for implementing those modifications. During construction, the developer shall be responsible for any damages attributed to the construction of related public improvements and shall coordinate with the Transportation Division and the City’s designated traffic signal maintenance company for technical support of the traffic signal during construction until such time as the improvements are accepted by the City to the satisfaction of the City Engineer.

1.27. Submit to the City electronic files, in Adobe Acrobat PDF format, of all submittals, including reports, studies, improvement plans and City redlines of previous submittals. Include AutoCAD and Esri GIS shape files as an e-transmitted zip file of all approved improvement plans. 110 201
PROJECT NO. PL 24-0098 (SA) 6 July 1, 2025

1.28. The Developer may coordinate with the City to identify any eligible development impact fee (DIF) credits in accordance with the Chino Municipal Code. If any credits are identified, the Developer shall enter into a mutually agreed-upon DIF credit agreement with the City, which shall be subject to City Council approval.

2.0 PRIOR TO REQUEST FOR AND RELEASE OF OCCUPANCY PERMITS/ACCEPTANCE OF PUBLIC IMPROVEMENTS:

2.1. Construct and secure Public Works Department approval of all public facilities enumerated under Section 1.0 above (per Resolution No. 88-23).

2.2. Underground all utility lines adjoining and interior to the project, including power lines of 34.5kV or less in accordance with City Code, Chapter 13.32

2.3. Distribute for signature of all buyers, the information and disclosure notice announcing that the development will be annexed to the City's Landscape and Street Lighting Maintenance Assessment District before transfer of property title and completion and acceptance of all public improvements.

2.4. The applicant’s Civil Engineer shall field verify that all BMPs are designed, constructed, and functional in accordance with the approved WQMP. BMPs shall also be inspected by Public Works Environmental staff. Coordinate inspection with staff and submit a completed City of Chino BMP field verification form for review and approval.

2.5. Provide and record a reciprocal use and maintenance agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.

2.6. Pay all remaining applicable fees pursuant to City Code.

2.7. Rehabilitate all street pavement impacted by utility trench repairs as directed by City staff. Install signing and striping per approved plans.

2.8. Submit to the City, electronic files of Tract/Parcel Map and “as-built” improvement plans in AUTOCAD, Esri GIS shape and Adobe Acrobat PDF formats. AUTOCAD files shall be submitted as an etransmitted zip file of the CAD drawings with all base files attached. Scanned resolution of PDF shall be a minimum of 360 dpi.

3.0 PRIOR TO FINAL ACCEPTANCE/PROJECT CLOSEOUT:

3.1 Complete all Conditions of Approval listed under Sections 1-3 above.

3.2 Submit to the City, electronic files of “as-built” improvement plans in AUTOCAD, Esri GIS shape and Adobe Acrobat PDF formats. AUTOCAD files shall be submitted as an etransmitted zip file of the CAD drawings with all base files attached. Scanned resolution of PDF shall be a minimum of 360 dpi.

Attachment
111 202
Rev 6/6/23

CITY OF CHINO

PUBLIC WORKS DEPARTMENT

DEVELOPMENT ENGINEERING DIVISION
PROJECT NO. PL24-0097(SCUP)/-0098 (SA)/-0120 (SCUP)
PROJECT ENGINEER: Daniel Aguirre
DATE: 7/1/2025

A COPY OF THIS CHECK LIST MUST BE PROVIDED ALONG WITH A COMPLETED PLAN CHECK REVIEW APPLICATION TO THE

ENGINEERING TECHNICIAN WHEN MAKING AN APPOINTMENT FOR FIRST PLAN CHECK SUBMITTAL Copy of Development Engineering Division Conditions of Approval Plan Check Fee Calculation Form
Maps (Subdivision Only)
Preliminary Title Report (no older than six months) (Subdivision Only) Closure Calculations (Subdivision Only)
Referenced Maps (Subdivision Only)
Preliminary Soils Report (no older than sixty days)
Lot line adjustment certificate
Lot merger
Right-of-way dedication
Rough Grading Plans
Precise Grading Plans
Storm Drain Plans
Hydrology and Hydraulic Calculations with Backup Data (Signed and Sealed by a Registered Civil Engineer)
Engineering Cost Estimate (On City Forms) with Engineer’s Wet Signature and Stamp Street Improvements Plans
Cross-Sections (if street plans are required) at 50’ intervals and extended a minimum of 100’ beyond limits of improvements
Sewer Plans (Delta revisions for proposed connections)
Domestic Water Plans (Delta revisions for proposed connections) Recycled Water Plans
Street Light Plans
Voltage Drop Calculations (Signed and Sealed by a Registered Engineer) Signing and Striping Plans
Traffic Signal Interconnect Plans
Traffic Signal Plans (dependent on curb ramp design)
Water Quality Management Plan
Construction Management Plan
112 203
Special Districts Leadership Foundation - District of Distinction Since 2008 June 25, 2025
It is a recommendation of the Fire District that the developer of every new construction project facilitate a preconstruction meeting. The meeting is to be scheduled with the Fire District Inspector for said project.

The following are the conditions of the above referenced permit/project. All conditions shall be adhered to, failure to comply with said conditions may result in the revocation of said permit and/or punitive fines as outlined in the Fire District fee schedule.

We look forward to a cooperative working relationship throughout the project. Should you have any questions regarding the project, including the conditions as set forth herein, please feel free to contact our office at (909) 902-5280.

1.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO RECORDATION:

1.1 Fire access roads shall be designed and plans submitted to the Fire District for approval.

Fire access roads shall be constructed of an all-weather hard surface, such as, asphalt or concrete, and be a minimum unobstructed width of 26 feet and minimum clear height of 13’6”. The road grade shall not exceed twelve percent (12%) maximum. An approved turn around shall be provided at the end of each roadway in excess of 150 feet in length. Aerial access shall be provided for any buildings 30’ ft. and higher per 2019 CFC. Appendix D. A 26’ ft. wide access road shall be a minimum of 15’ ft. to the building and a maximum of 30’ ft. from the building. Access roads shall comply with Fire District Standard No. 111.

Chino Valley Fire District
14011 City Center Drive
Chino Hills, CA 91709
(909) 902-5260 Administration
(909) 902-5250 Fax
Chinovalleyfire.org
2024-00002066
Fire Protection Requirements

GATEWAY TERMINAL LLC
13925 CITY CENTER DR STE 200
CHINO HILLS, CA - California 91709
Project Name: GATEWAY TERMINAL, PL24-
0097(SCUP), PL24-0098 (SA), PL24-0120
Project Address: 5835 & 5885 Schaefer Ave.

Chino, CA. 91710

Board of Directors
Sarah-Ramos Evinger
President
Mike Kreeger
Vice President
Tom Haughey
Harvey Luth
Andrew Romaine
Fire Chief
Dave Williams
113 204
Special Districts Leadership Foundation - District of Distinction Since 2008

1.2 The development and each phase shall have two (2) points of vehicular access during construction. Fire District Standard No. 111 shall be complied with.

1.3 Water systems shall be designed to meet the required fire flow of this development and be approved by the Community Risk Reduction Division. Buildings in excess of 100,000 square feet shall have a minimum of two (2) connections to a public main. The developer shall furnish the Community Risk Reduction Division with three (3) copies of the water system working plans done by the installing contractor for approval, along with the Fire Flow Availability Form completed by the water purveyor prior to recordation. The required fire flow shall be determined by using the California Fire Code, current adopted edition. For all private systems, the water systems shall comply with Fire District Standard Nos. 101, 102, and 103. In areas without water-serving utilities, fire protection water systems shall be based on NFPA Pamphlet 1231. For water connections and work conducted in the public right of way, please refer to separate plans reviewed and approved by the water purveyor.

1.4 Fire hydrants shall be six-inch (6") diameter with a minimum one four-inch (4") and one two and one-half inch (2-1/2") connections. All fire hydrants shall be spaced a maximum of three hundred feet (300') apart. Private water systems shall comply with Fire District Standard Nos. 101, 102, and 114. All hydrants shall be installed with pavement markers to identify their locations.

1.5 Access drives which cross property lines shall be provided with CC & R's, access easements or reciprocating agreements and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.

1.6 Underground fire mains which cross property lines shall be provided with CC & R's, easements, or reciprocating agreements addressing the use and maintenance of the mains and hydrants and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.

2.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMIT:

2.1 Fire access roads shall be constructed and approved by the Community Risk Reduction Division prior to combustibles being brought onto the site.

2.2 Approved street signs shall be installed prior to issuance of building permits, as well as a job site address.

2.3 Fire Protection water systems shall be tested, operational, and approved by the Community Risk Reduction Division prior to combustible materials being brought to the site.

2.4 All flammable vegetation shall be removed from each building site for a minimum distance of thirty feet (30') from any flammable building material including all structures. 114 205
Special Districts Leadership Foundation - District of Distinction Since 2008

2.5 A detailed site plan of the development is required to be submitted in electronic (pdf.) format. The plan must show and be limited to: locations of property lines, buildings, and equipment and hazards for emergency response purposes. Please refer to Fire District Standard No. 143. Additional or revised files may be required during construction and/or prior to final signoff.

2.6 The Developer shall submit, as an electronic file, a drawing of the new streets in pdf format to the Fire District with the building construction plans. Format must contain and be restricted to the following layers: A. Right of way; B. Parcel Lines; C. Street Names; D. Address numbers; E. Fire Hydrants. Additional or revised files may be required during construction and/or prior to final signoff.

3.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO OCCUPANCY:

3.1 An automatic protection fire sprinkler system is required for all buildings 5,000 sq. ft or greater. and/or when used for allowable area increase, if applicable. This system shall comply with NFPA Standard No. 13 and Fire District Standard No. 110. An electronic/PDF set of detailed plans along with hydraulic calculations and material specifications shall be submitted to the Community Risk Reduction Division. The system shall be installed, tested and approved prior to system final. Fire sprinkler systems shall be installed by a licensed C-16 contractor and the contractor is required to submit a report to The Compliance Engine (TCE).

3.2 An automatic fire alarm system is required. An electronic/PDF set of detailed plans shall be submitted showing the design, system components, signaling devices, fire alarm power supply, control panel and auxiliary devices and functions of the alarm system. Please refer to Fire District Standard No. 133 and current adopted editions of the California Building Code, as well as NFPA Standard 72. The contractor is required to submit a report to The Compliance Engine (TCE).

3.3 Approved in-building, two-way emergency responder communication coverage for emergency responders shall be provided in all new buildings, if ERRC evaluation determines the need for installation of system. In-building, two-way emergency responder communication coverage within the building shall be based on the existing coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the exterior of the building. System shall comply with current adopted edition of the California Fire Code, NFPA 70, 72 & 1221 and the contractor is required to submit a report to The Compliance Engine (TCE).

3.4 An automatic fixed fire extinguishing system may be required. An electronic/PDF set of detailed plans shall be submitted to the Community Risk Reduction Division for approval.

System shall comply with current adopted edition of the California Fire Code, NFPA Standard 17-A, and UL 300. Please refer to Fire District Standard No. 112. The contractor is required to submit a report to The Compliance Engine (TCE).

3.5 Insulated liquid carbon dioxide systems with more than 100 pounds (45.4 kg) of carbon dioxide used in beverage dispensing applications shall comply with CFC, Section 5307.3.1., and shall be provided with mechanical ventilation or a gas detection system. The contractor is required to submit a report to The Compliance Engine (TCE). 115 206
Special Districts Leadership Foundation - District of Distinction Since 2008

3.6 A maximum occupant load sign shall be posted in a conspicuous location neat the main entrance/exit of the room, if occupant load is greater than 49 people. Such sign shall be legible.

3.7 Hand-held portable fire extinguishers are required to be installed. The location, type and cabinet design shall be approved by the Community Risk Reduction Division.

3.8 Exits, doors, signs and approved path marking shall be installed in accordance with the current adopted edition of the California Building Code, Section 1007

3.9 "No Parking - Fire Lane" signs shall be installed in interior access drives at locations designated by the Community Risk Reduction Division. Curbs shall be painted red at locations designated by the Community Risk Reduction Division. Please refer to Fire District Standard No. 121.

3.10 An approved recessed Fire Department "KNOX" brand key box is required. The key box shall be located at or near the main entrance(s), and shall be provided with a tamper switch and shall be monitored by an approved central station monitoring service. Please refer to Fire District Standard No. 117.

3.11 An approved Knox key switch and/or Knox lock is required on each automatic electric or manual gate that crosses an EVA. All automatic gates shall be provided with a manual override. Fire District Standard No. 116 & 117 shall be complied with.

3.12 Commercial, industrial, and multi-family building addresses shall be posted with a minimum eight inch (8") numbers, visible from the street and during the hours of darkness they shall be internally or externally electrically illuminated. Posted numbers shall contrast with the background used and be legible from the street.

Where building set back exceeds 100 feet from the roadway, additional non-illuminated six inch (6") numbers shall be displayed at the property access entrance. These numbers shall also contrast with the background used. Fire District Standard No. 122 must be complied with.
116 207
Special Districts Leadership Foundation - District of Distinction Since 2008

3.13 An electronic/PDF set of plans shall be submitted separately for each of the following listed items to the Fire District for review, approval and permit prior to any installation or work being done. Approved plans must be maintained at the worksite during construction. Fees are due at the time of submittal.

a) Building Construction, includes tenant improvement work b) Private (onsite) Underground Fire Protection Water Systems, if applicable c) Fire Sprinkler Systems, designed by C16 contractor or registered engineer d) Fire Alarm Systems or Sprinkler Monitoring Systems designed by a C7, C10 contractor or registered engineer.
e) Knox box and/or security gate locations.
f) Gas detection systems
g) Emergency Responder Radio Coverage Systems
Applicable Standards:
101, 102, 103, 110, 111, 114, 117, 121, 122, 133, 141, 143 CVFD Standards available online at http://www.chinovalleyfire.org 117 208

PARKWAY PLANTER
= 642 S.F.

PLANTER AREA
= 1,863 S.F.

PARKWAY

PLANTER
= 73 S.F.

PLANTER
AREA =
593 S.F. PARKWAY PLANTER = 712 S.F.

PLANTER
AREA
= 192 S.F. PLANTER AREA
= 3,511 S.F.

PLANTER
AREA =
5,801 S.F.*

PLANTER AREA
= 1,318 S.F.

PLANTER AREA
= 4,644 S.F.

PARKWAY PLANTER
= 537 S.F. COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT 22 S.F.

PLANTER
AREA =
2,863 S.F.*

PLANTER
AREA =
5,719 S.F.*

PLANTER
AREA =
1,651 S.F.

PLANTER AREA
= 581 S.F. PLANTER AREA
= 512 S.F.

PLANTER
AREA =
1,412 S.F.

PLANTER AREA
= 1,275 S.F. PLANTER
AREA =
770 S.F.

PLANTER
AREA =
79 S.F. PLANTER
AREA =
79 S.F. PLANTER
AREA =
79 S.F. COMPACT

PLANTER
AREA =
183 S.F. COMPACT COMPACT
MENS
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT WOMENS

STORAGE STORAGE STORAGE STORAGE

OUTDOOR

SEATING AREA OUTDOORSEATING AREA

PARKWAY PLANTER
= 314 S.F. PARKWAY PLANTER
= 1,585 S.F. PARKWAY PLANTER
= 632 S.F. COMPACT COMPACT COMPACT

PLANTER
AREA =
133 S.F. COMPACT
1021-052-04-0-000
CBC 2022
M1- LIGHT INDUSTRIAL

III-B, FULLY

SPRINKLERED
· (1) NEW CONCRETE TILT UP WAREHOUSE / OFFICE BUILDING AS DESCRIBED BELOW · (1) NEW SHIPPING CONTAINER FOOD AND BEVERAGE BUILDING AS DESCRIBED BELOW ASSESSOR'S PARCEL NO:

BUILDING CODE

BUILDING TYPE
BLDG. OCCUPANCY

DESCRIPTION

PROJECT
ZONING
AREAS
LAND AREA :

DESCRIPTION

PROJECT DATA
S1 : WAREHOUSE
B : OFFICE

AREA JUSTIFICATION

CONSTRUCTION TYPE III-B WITH FULLY SUPERVISED AUTOMATIC FIRE SPRINKLER SYSTEMS UNLIMITED AREA WITH 60' YARDS ALL AROUND, THE YARDS CAN BE REDUCED TO 40' IN NO MORE THAN 75% OF THE PERIMETER

49.0%
132 - STALLS
ACCESSIBLE (8' RAMP) 4 - STALLS
PARKING PROVIDED:

TOTAL
17' X 20'
ALLOWABLE LOT COVERAGE:

COVERAGE :

50.0%
ACCESSIBLE (STANDARD) 14' X 20' 2 - STALLS
7 SPACES

PARCEL SIZE
STANDARD STALLS 9' X 19' 67 - STALLS

LANDSCAPED AREA REQUIRED
10% OF PARCEL 32,014 S.F.

LANDSCAPED AREA PROVIDED =
32,727 S.F. AGGREGATE

PLANTER AREAS
NUMBER OF STORIES ALLOWABLE STORIES PER 504.4 = 3
BICYCLE RACK @ 5% OF PARKING

TRUCK LOADING REQUIRED
CLEAN AIR STALLS 9' X 19' 13 - STALLS
TRASH ENCL. AREA PROVIDED 430 S.F.

F1: MANUFACTURING
2 SPACES
TRUCK LOADING PROVIDED 20 SPACES
BUILDING HEIGHT MAXIMUM BUILDING HEIGHT PER 504.3 = 75' *HEIGHT, NUMBER OF STORIES AND ALLOWABLE AREA CALCULATED BASED ON THE MOST RESTRICTIVE OCCUPANCY ALLOWANCE PER § 508.3, IN THIS CASE F1-S CLEAN AIR STALL EVSE 9' X 19' 13 - STALLS
GROSS ±320,139 S.F.

TOTAL AREA

ALL BUILDINGS
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
162,068 S.F.

OFFICE PARKING 1/250
PARKING REQUIRED :
8,500/ 250 = 34 STALLS
20,000/ 1000 = 20 STALLS
20,000/ 2000 = 10 STALLS
110,048/ 4000 = 28 STALLS
92 STALLS
150,048 S.F.
3,500 S.F.
153,548 S.F.

TOTAL PARKING REQUIRED
COMPACT STALLS (25%MAX) 8'-6" X 17' 33 - STALLS
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

WAREHOUSE PARKING 1/2000 SECOND 20,000
WAREHOUSE PARKING 1/1000 FIRST 20,000
1021-052-09-0-000
1021-052-06-0-000
1021-052-11-0-000
TRUCK PARKING PROVIDED 10 SPACES

0.51 ALLOWABLE FAR:

FAR:

0.60 BUILDING 1 158,548 S.F.
(M) TENANT SPACES & RESTROOMS**
(M) INDOOR SEATING AREAS
(M) OUTDOOR SEATING AREAS*

TOTAL FOOTPRINT
FIRST
FLOOR
3,520 S.F.

N/A
3,600 S.F.
3,520 S.F.

F & B BUILDING 3,520 S.F.

BUILDING 1

F & B BUILDINGS
TOTAL PARKING REQUIRED 128
OCCUPANCIES B-S1-F1-M

OCCUPANCIES B & M
3,600 / 100 = 36 STALLS
WAREHOUSE PARKING 1/4000 EXCESS
RESTAURANT SEATING AREAS 1/100
CONTRIBUTES TO PARKING CALCULATIONS BUT NOT TO BUILDING AREA* CONTRIBUTES TO BUILDING AREA BUT NOT TO PARKING CALCULATIONS** M : MERCANTILE
RATIO OF IMPERVIOUS SURFACE: EXISTING 30 % PROPOSED 88% TRUCK PARKING REQUIRED (1 PER EA 2 LOADING) 10 SPACES
SITE OAKS AVE.
6/19/2025 3:12 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A100.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007

ST A T E
OF
C
A
L
FI OR I N AC-34996 RENEWAL DATE 10/31/2019

GI NAC I O
CRESPO

I L CENSED
A
RCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS:
-
-
- architecture O.C. DESIGN & ENGINEERING A100 1 SITE PLAN INDICATED OFFICE
± 3,500 S.F. F.F.
± 5,000 S.F. MEZZ.
± 8,500 S.F.

CL
1 1" = 30'-0"

SITE PLAN
ACCESSIBLE PATH OF TRAVEL. 60" WIDE (MIN.)

CONCRETE TILT UP WALL
12' X14' TRUCK DOOR (GRADE LEVEL)
1 2
3 4
5 6
7 8
9 10
11 BUILDING ENTRANCE. AFFIX A 4" SQ. INTERNATIONAL ACCESSIBILITY SYMBOL PER CBC 11B-216.6 & FIRE DEPARTMENT KNOX BOX
PARKING STALL DOUBLE STRIPPING (PER CITY OF CHINO STDS.) TYPICAL

CONCRETE PAVING, PER CIVIL DRAWINGS
28'-0" WIDE MIN. & CLEAR TO THE SKY FIRE LANE PER THE

CITY OF CHINO'S FIRE DEPARTMENT STANDARDS

PREFABRICATED CONCRETE BUMPER, TYPICAL
TRASH ENCLOSURE, MIN. 6' HIGH SCREEN WALLS WITH METAL
DOORS (2-TRASH / RECYCLE BINS + 1 96 GALLON ORGANICS

RECYCLING BIN) PER CITY OF CHINO STANDARDS SEE
12 9' X10' TRUCK DOOR (DOCK HIGH) TYPICAL
13 14
(E) CURB AND GUTTER, TYP.
15 (E) LIGHT POLE, TYP.
16 (E) PUBLIC FIRE HYDRANT
17 (N) PRIVATE FIRE HYDRANT
18 10'-0 HIGH CONCRETE TILT UP SCREEN WALL, COLOR AND
REVEALS TO MATCH THE BUILDING, SEE ELEVATIONS.
19 10'-0 WROUGHT IRON SLIDING GATE, WITH 1" SQUARE TUBE STEEL PICKETS SPACED AT 6" O.C., PROVIDE PERFORATED SHEET METAL AFFIXED TO THE INSIDE SURFACE PROVIDING MINIMUM 50% SCREEN. PROVIDE FIRE DEPARTMENT KNOX BRAND KEY SWITCH COMPLIANT WITH ONTARIO FD STANDARDS #B-003, #B-004 & #H-001 PROVIDE ELECTRICAL CONDUIT FOR GATE OPENER FUTURE USE 20 8'-0 WROUGHT IRON FENCE
21 22

ENHANCED PEDESTRIAN ACCESS, TOP CAST ACID WASH CONCRETE GRAPHITE COLOR WITH SCORE LINES PER DESIGN.
23 EXTERIOR PATIO "BY OTHERS" SEE RAD PLANS.
24 CONCRETE STAIRS, MEDIUM BROOM FINISH TYPICAL. SEE GRADING PLANS FOR ELEVATIONS.
25 ENHANCED DRIVEWAY APPROACH, 6" MIN. THICK, 3500 PSI
26 TRACTOR TRAILER PARKING STALL, TYPICAL
27 EXISTING SIDEWALK.
28 LITHONIA KBC8 LED WHITE, LIGHTED BOLLARD AT ENTRY
29 30
LOCATION OF INTERIOR ROOF DRAIN, SEE CIVIL PLANS, TYP.
31 SITE PLAN KEYNOTES
32 BYCICLE RACK, (5 PARKING SPACES EACH)
33 PROPOSED LOCATION OF FIRE SPRINKLER RISER
34 6" DIAM. CONCRETE FILLED PIPE BOLLARD, TYPICAL.
3 HOUR CONCRETE TILT UP WALL W/ 3 HOUR JOINTS
3'X7' HOLLOW METAL MAN DOOR (TYPICAL)WITH 60"x60" LANDING.

PARKING SPACES FOR CLEAN AIR VEHICLE / CARPOOL PARKING
NO SMOKING SIGNAGE WITHIN 25'-0" OF BUILDING ENTRIES, OUTDOOR AIR INTAKES, OPERABLE WINDOWS, AND WITHIN THE BUILDING.

CONCRETE APRON: 6" THICK CONCRETE PAVING OVER 4" CLASS 2 AGREGATE OVER 12" (90%) COMPACTED SUBGRADE, 3,000 PSI W/ #3 REBAR @ 18" O.C.

EACH WAY, 4" SLUMP CONTROL JOINTS AT 20'-0" O.C. EACH WAY, HEAVY

BROOM FINISH, SEE CIVIL PLANS
1A

DROUGHT TOLERANT LANDSCAPE W/AUTOMATIC IRRIGATION SYSTEM SEE LANDSCAPING DWGS. MOUND LANDSCAPE WHERE PATH OF TRAVEL OCCURS TO PROVIDE 3" MAX. GRADE ELEVATION DIFFERENCE, TYPICAL 35 36
37 38
39 40
41 42
RUBBER BUMPER BY OTHERS, TYPICAL., PROVIDE EDGE OF
DOCK LEVELERS WHERE NO PIT LEVELER IS PROVIDED.

FUTURE EVSE LOCATION COMPLIANT TO CGBSC § 5.106.5.3.2

SEE ELECTRICAL PLANS
43 PIT STYLE DOCK LEVELER, TYPICAL EVERY OTHER TRUCK DOOR

ACCESSIBLE PARKING, TYP
6" WIDE MOWSTRIP @ PROPERTY LINE, TYPICAL

NOT TO SCALE

VICINITY MAP
SCHAEFER AVE.

CL
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
150,048 S.F.
3,500 S.F.
153,548 S.F.
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

BUILDING 1 158,548 S.F.

OCCUPANCIES B-S1-F1-M
PROVIDE "0" CURB TO

ACCESS MONITORING WELL
0 10' 25' 50' 100' 200'

GRAPHIC SCALE
44 45
DESIGNATED SMOKING AREA FURTHER THAN 25' AWAY FROM
BUILDING DOORS AND VENTILATION OPENINGS.
46 TRANSFORMER PAD, SCREENED WITH LANDSCAPING
MATERIAL, COORDINATE WITH THE UTILITY EXACT LOCATION.
(E) POWER POLE, TO BE RELOCATED
(N) PUBLIC FIRE HYDRANT
47 FORKLIFT RAMP, SEE CIVIL DRAWINGS
2 1" = 30'-0" PROPOSED LOCATION OF PIV VALVE COMPLETELY SCREENED SCHAEFFER AVE. STREET SECTION
3 1" = 30'-0"
OAKS AVE. STREET SECTION
R.O.W.

PLANTER
(E) SIDEWALK
(E) PAVEMENT

PL CL PL

PL CL PL UTILITY EASEMENT TO BE QUITCLAIMED

INGRESS / EGRESS & PARKING EASEMENT
R.O.W.

PLANTER
(E) SIDEWALK
(E) PAVEMENT
SCHAEFER AVE. OAKS AVE.STOCKTON AVE. 19'-6"
249'-3" PROPOSED PROPERTY LINE 510'-9" PROPERTY LINE
361'-5" PROPOSED PROPERTY LINE 98'-6" PROPERTY LINE 147'-6" PROPERTY LINE 163'-1" PROPERTY LINE
100'-0" PROPERTY LINE
366'-11" PROPERTY LINE 330'-2" PROPOSED PROPERTY LINE 70'-9" PROPOSED PROPERTY LINE 14'-0" 36'-0" 50'-0" 8'-0"
30'-0"
22'-0"
381'-4" PROPOSED PROPERTY LINE
8'-6" 5'-6" 2'-0"
14'-0" 36'-0"
50'-0" 50'-0"
2'-6" 5'-6" 2'-0"
8'-0" 22'-0"
30'-0"
100'-0"
60'-0"
110 120
90 93
80 70
60 50
40 20
1 PROPOSED PARCEL 2 ± 34,683 S.F.

PROPOSED
PARCEL 1
± 285,640 S.F.
10 60'-0" TYPICAL
56'-0" TYPICAL 42'-6" 1:1 SETBACK
(N) DRIVEWAY
47'-6"
(N) DRIVEWAY 60'-5"
536'-8" BUILDING DIMENSION 25'-0" SETBACK 312'-0" BUILDING DIMENSION 59'-5" BUILDING SEPARATION 49'-7" SETBACK19'-0" TYP. 17'-0" TYP. 8STALLS @ 9'-0" = 72'-0" 19'-0" TYP. 14 STALLS @ 9'-0" = 126'-0" 19'-0"
TYP.
28'-0"
19 STALLS @ 8'-6" = 161'-6"
17'-0"
TYP.
10 STALLS @ 8'-6" = 85'-0"
17'-0"
TYP.
5 STALLS @ 9'-0" = 45'-0" 19'-0"
TYP. 9'-0" 8'-0"
18'-0" 18'-0" 9'-0" 5'-0"
3 STALLS @ 9'-0"
= 54'-1"
336'-0" BUILDING DIMENSION 240'-0" BUILDING DIMENSION 76'-0" BLDG. DIM. 12'-0"
TYP. 45'-0" TYPICAL
22'-5"
15 11'-11"
6" WIDE, 6" MIN. HIGH CONCRETE CURB, TYPICAL. CURB TO BE 1'

WIDE WHEN ADJACENT TO PARKING STALLS, SEE GRADING PLANS 48 BUILDING COLUMN PER STRUCTURAL, TYPICAL 9'-0" 9'-0"
92 130
10'-7" 125'-6"
30 28'-9" 54'-0"
42'-4"

SETBACK

F & B BUILDINGS
(N) DRIVEWAY
33'-0" 38'-0" 38'-0" 41'-3"
7 STALLS @ 9'-0" = 63'-0" 8 STALLS @ 9'-0" = 72'-0" 90'-10" PROPOSED PROPERTY LINE 368'-0" BUILDING DIMENSION 52'-0" BUILDING DIMENSION 536'-8" BUILDING DIMENSION
228'-0" BUILDING DIMENSION
13 STALLS @ 9'-0" = 117'-0"
308'-8" BUILDING DIMENSION
43'-8" BLDG. D.
13'-0"
BLDG. D.
56'-0" BLDG. D.
48'-0" BLDG. D. 120'-0" BLDG. D. 48'-0" BLDG. D. 120'-0" BLDG. D. 4'-0" TYP. 4'-0" TYP. 4'-0" 96'-0" BLDG. D. 116'-0" BLDG. D. 96'-0" BLDG. D. 19'-0" TYP. 19'-0"
TYP.
28'-0"
(N) DRIVEWAY 41'-3" 30'-2" 6'-11"
84'-0" BLDG. D.
12'-0"
TYP. 45'-0" TYPICAL
33'-0"
SETBACK 30'-0"
19'-0"
TYP
74'-0" BUILDING SEPARATION 28'-0" MIN. TYPICAL
9'-0" 5'-0" 9'-0"
4 STALLS @ 8'-6" = 34'-0"
9 STALLS @ 9'-0" = 81'-0"
8 STALLS @ 9'-0" = 72'-0" 19'-0" TYP.
14 100 30'-0"
14 13A (E) LIGHT POLE TO BE RELOCAED
13A
14 1A
1 1 1A
1 1
1 1
2 10
3 3
3 4
4 4
5 6
6 8 7
9 9
9 2
10 11
11 11
12 12
13 13
13 13
15 15
16 17
17 17
17 17
18 18
19 19
20 20
20 20
27 22
23 23
23 24
24 24
24 25
26 21
38 28
29 29
29 29
30 31
31 31
32 32
32 32
33 34
35 36
36 37
37 38
28 38
39 39
40 41
41 42
43 44 45 44
46 47
47 48 9'-0" 9'-0" 9'-0" 9'-0" 4 STALLS @ 9'-0" = 36'-0" 7 STALLS @ 9'-0" = 63'-0"
132
19'-0"
TYP.
3'-0"
STREET

DECICATION
118 209

MENS F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT WOMENS

STORAGE STORAGE STORAGE STORAGE

OUTDOOR
SEATING AREA OUTDOORSEATING AREA A101 2 SITE UTILIZATION INDICATED 1 1" = 100'-0"

SITE UTILIZATION
SCHAEFER AVE.
5/29/2025 12:34 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A101.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007

ST A T E
OF
C
A
L
FI OR I N AC-34996 RENEWAL DATE 10/31/2019

GI NAC I O
CRESPO

I L CENSED
A
RCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS:
-
-
- architecture O.C. DESIGN & ENGINEERING
0 50' 100' 250' 500'

GRAPHIC SCALE
20' OAKS AVE. SYCAMORE LN.

ASHLEY CT. AMBER RD. BENSON AVE. AMARILLO AVE.

GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL

PROPOSED DEVELOPMENT
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "GI"
ZONING "M2"

GENERAL

INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "LI"
ZONING "M1"

LIGHT INDUSTRIAL
GENERAL PLAN "RD4.5"
ZONING "RD4.5"
3-4.5DUs/Ac
GENERAL PLAN "RD4.5"
ZONING "RD4.5"
3-4.5DUs/Ac
GENERAL PLAN "RD4.5"
ZONING "RD4.5"
3-4.5DUs/Ac
GENERAL PLAN "RD4.5"
ZONING "RD4.5"
3-4.5DUs/Ac
GENERAL PLAN "RD4.5"
ZONING "RD4.5"
3-4.5DUs/Ac
119 210

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT MENS
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT WOMENS

STORAGE STORAGE STORAGE STORAGE

OUTDOOR
SEATING AREA OUTDOORSEATING AREA COMPACT COMPACT COMPACT COMPACT A102 3 PEDESTRIAN CIRCULATION PLAN INDICATED 1 1" = 40'-0"

PEDESTRIAN CIRCULATION PLAN
5/29/2025 12:36 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A100.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007 ST A T E OF CA L FI OR I N AC-34996 RENEWAL DATE 10/31/2019 GI NAC I O CRESPO I L CENSED ARCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS: - - - architecture O.C. DESIGN & ENGINEERING 0 10' 25' 50' 100' 200'

GRAPHIC SCALE

BUILDING ENTRANCE
EXISTING 5' SIDEWALK
DISABLED ACCESSIBLE PATH OF TRAVEL MIN. 5' WIDE

PLAN LEGEND

CROSSWALK UNMARKED

EXISTING CROSSWALK SIGALIZED

PROPOSED CURB RAMP

EXISTING CURB RAMP

DISABLED ACCESSIBLE PARKING

ALL ACCESSIBLE ROUTES DEPICTED IN THIS PLAN SHALL HAVE LESS THAN 5% SLOPE AND LESS THAN 2% CROSS SLOPE
120 211

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
90°
WB-50

AASHTO PATH OF FRONT WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3' 105°
WB-50
AASHTO

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
90°
WB-50
AASHTO

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
90°
WB-50

AASHTO COMPACT

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
90°
WB-50
AASHTO COMPACT COMPACT COMPACT PATH OF FRONT WHEEL PATH OF REAR WHEEL 4' 8.5' 45 FT. MIN. 18' 30' 3' 90° WB-50 AASHTO

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
90°
WB-50
AASHTO COMPACT COMPACT COMPACT PATH OF FRONT WHEEL PATH OF REAR WHEEL 4' 8.5' 45 FT. MIN. 30' 18' 3' 90° AASHTO WB-50 PATH OF FRONT WHEEL PATH OF REAR WHEEL 4' 8.5' 45 FT. MIN. 30' 18' 3' 90° AASHTO WB-50

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
75°
WB-50

AASHTO COMPACT
WB-50

PATH OF OVERHANG

PATH OF FRONT WHEEL

PATH OF REAR WHEEL
4' 8.5'
45 FT. MIN.
30'
18'
3'
AASHTO
30°
60°
90°
120°
150° 180°
1021-052-04-0-000
CBC 2022
M1- LIGHT INDUSTRIAL

III-B, FULLY

SPRINKLERED
· (1) NEW CONCRETE TILT UP WAREHOUSE / OFFICE BUILDING AS DESCRIBED BELOW · (1) NEW SHIPPING CONTAINER FOOD AND BEVERAGE BUILDING AS DESCRIBED BELOW ASSESSOR'S PARCEL NO:

BUILDING CODE

BUILDING TYPE
BLDG. OCCUPANCY

DESCRIPTION

PROJECT
ZONING
AREAS
LAND AREA :

DESCRIPTION

PROJECT DATA
S1 : WAREHOUSE
B : OFFICE

AREA JUSTIFICATION

CONSTRUCTION TYPE III-B WITH FULLY SUPERVISED AUTOMATIC FIRE SPRINKLER SYSTEMS UNLIMITED AREA WITH 60' YARDS ALL AROUND, THE YARDS CAN BE REDUCED TO 40' IN NO MORE THAN 75% OF THE PERIMETER

49.0%
132 - STALLS
ACCESSIBLE (8' RAMP) 4 - STALLS
PARKING PROVIDED:

TOTAL
17' X 20'
ALLOWABLE LOT COVERAGE:

COVERAGE :

50.0%
ACCESSIBLE (STANDARD) 14' X 20' 2 - STALLS
7 SPACES

PARCEL SIZE
STANDARD STALLS 9' X 19' 67 - STALLS

LANDSCAPED AREA REQUIRED
10% OF PARCEL 32,014 S.F.

LANDSCAPED AREA PROVIDED =
32,727 S.F. AGGREGATE

PLANTER AREAS
NUMBER OF STORIES ALLOWABLE STORIES PER 504.4 = 3
BICYCLE RACK @ 5% OF PARKING

TRUCK LOADING REQUIRED
CLEAN AIR STALLS 9' X 19' 13 - STALLS
TRASH ENCL. AREA PROVIDED 430 S.F.

F1: MANUFACTURING
2 SPACES
TRUCK LOADING PROVIDED 20 SPACES
BUILDING HEIGHT MAXIMUM BUILDING HEIGHT PER 504.3 = 75' *HEIGHT, NUMBER OF STORIES AND ALLOWABLE AREA CALCULATED BASED ON THE MOST RESTRICTIVE OCCUPANCY ALLOWANCE PER § 508.3, IN THIS CASE F1-S CLEAN AIR STALL EVSE 9' X 19' 13 - STALLS
GROSS ±320,139 S.F.

TOTAL AREA

ALL BUILDINGS
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
162,068 S.F.

OFFICE PARKING 1/250
PARKING REQUIRED :
8,500/ 250 = 34 STALLS
20,000/ 1000 = 20 STALLS
20,000/ 2000 = 10 STALLS
110,048/ 4000 = 28 STALLS
92 STALLS
150,048 S.F.
3,500 S.F.
153,548 S.F.

TOTAL PARKING REQUIRED
COMPACT STALLS (25%MAX) 8'-6" X 17' 33 - STALLS
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

WAREHOUSE PARKING 1/2000 SECOND 20,000
WAREHOUSE PARKING 1/1000 FIRST 20,000
1021-052-09-0-000
1021-052-06-0-000
1021-052-11-0-000
TRUCK PARKING PROVIDED 10 SPACES

0.51 ALLOWABLE FAR:

FAR:

0.60 BUILDING 1 158,548 S.F.
(M) TENANT SPACES & RESTROOMS**
(M) INDOOR SEATING AREAS
(M) OUTDOOR SEATING AREAS*

TOTAL FOOTPRINT
FIRST
FLOOR
3,520 S.F.

N/A
3,600 S.F.
3,520 S.F.

F & B BUILDING 3,520 S.F.

BUILDING 1

F & B BUILDINGS
TOTAL PARKING REQUIRED 128
OCCUPANCIES B-S1-F1-M

OCCUPANCIES B & M
3,600 / 100 = 36 STALLS
WAREHOUSE PARKING 1/4000 EXCESS
RESTAURANT SEATING AREAS 1/100
CONTRIBUTES TO PARKING CALCULATIONS BUT NOT TO BUILDING AREA* CONTRIBUTES TO BUILDING AREA BUT NOT TO PARKING CALCULATIONS** M : MERCANTILE
RATIO OF IMPERVIOUS SURFACE: EXISTING 30 % PROPOSED 88% TRUCK PARKING REQUIRED (1 PER EA 2 LOADING) 10 SPACES OAKS AVE. 5/29/2025 12:38 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A103 TRUCK ACCESS PLAN.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007

ST A T E
OF
C
A
L
FI OR I N AC-34996 RENEWAL DATE 10/31/2019

GI NAC I O
CRESPO

I L CENSED
A
RCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS:
-
-
- architecture O.C. DESIGN & ENGINEERING A103 1 TRUCK ACCESS PLAN INDICATED CL
1 1" = 30'-0"

TRUCK ACCESS PLAN
SCHAEFER AVE.

CL
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
150,048 S.F.
3,500 S.F.
153,548 S.F.
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

BUILDING 1 158,548 S.F.

F & B BUILDING 3,520 S.F.

OCCUPANCIES B-S1-F1-M

OCCUPANCIES B & M
(M) TENANT SPACES & RESTROOMS**
(M) INDOOR SEATING AREAS
(M) OUTDOOR SEATING AREAS*

TOTAL FOOTPRINT
FIRST
FLOOR
3,520 S.F.

N/A
3,600 S.F.
3,520 S.F.

F & B BUILDING 3,520 S.F.

OCCUPANCIES B & M
0 10' 25' 50' 100' 200'
GRAPHIC SCALE 25'-0" SETBACK10'-0" ± 88' 14'-0" 36'-0" 50'-0" 8'-0"
30'-0"
22'-0"

TRUCK TURNING

TEMPLATES
· SEMI TRAILER WB-50
AASHTO
· TRASH / RECYCLING

FIRE APPARATUS

ACCESS ROAD DESIGN
PER STANDARD A-1

FIRE LANE,
TYPICAL 26'-0"
26'-0"
R19'-0" 45'-0"
45'-0"
45'-0"
OFFICE
± 3,500 S.F. F.F.
± 5,000 S.F. MEZZ.
± 8,500 S.F.

F & B BUILDING
121 212
A104 1 FENCE PLAN INDICATED
OFFICE
± 3,650 S.F. F.F.
± 4,600 S.F. MEZZ.
± 8,250 S.F. CL 1 1" = 30'-0"

FENCE PLAN

NOT TO SCALE

VICINITY MAP
SCHAEFER AVE. CL STOCKTON AVE. ± 88' 14'-0" 36'-0" 50'-0" 8'-0"
30'-0"
22'-0"
1021-052-04-0-000
CBC 2022
M1- LIGHT INDUSTRIAL

III-B, FULLY
SPRINKLERED · (1) NEW CONCRETE TILT UP WAREHOUSE / OFFICE BUILDING AS DESCRIBED BELOW · (1) NEW SHIPPING CONTAINER FOOD AND BEVERAGE BUILDING AS DESCRIBED BELOW ASSESSOR'S PARCEL NO:

BUILDING CODE

BUILDING TYPE
BLDG. OCCUPANCY

DESCRIPTION

PROJECT
ZONING
AREAS
LAND AREA :

DESCRIPTION

PROJECT DATA
S1 : WAREHOUSE
B : OFFICE

AREA JUSTIFICATION

CONSTRUCTION TYPE III-B WITH FULLY SUPERVISED AUTOMATIC FIRE SPRINKLER SYSTEMS UNLIMITED AREA WITH 60' YARDS ALL AROUND, THE YARDS CAN BE REDUCED TO 40' IN NO MORE THAN 75% OF THE PERIMETER

49.0%
132 - STALLS
ACCESSIBLE (8' RAMP) 4 - STALLS
PARKING PROVIDED:

TOTAL
17' X 20'
ALLOWABLE LOT COVERAGE:

COVERAGE :

50.0%
ACCESSIBLE (STANDARD) 14' X 20' 2 - STALLS
7 SPACES

PARCEL SIZE
STANDARD STALLS 9' X 19' 67 - STALLS

LANDSCAPED AREA REQUIRED
10% OF PARCEL 32,014 S.F.

LANDSCAPED AREA PROVIDED =
32,727 S.F. AGGREGATE

PLANTER AREAS
NUMBER OF STORIES ALLOWABLE STORIES PER 504.4 = 3
BICYCLE RACK @ 5% OF PARKING

TRUCK LOADING REQUIRED
CLEAN AIR STALLS 9' X 19' 13 - STALLS
TRASH ENCL. AREA PROVIDED 430 S.F.

F1: MANUFACTURING
2 SPACES
TRUCK LOADING PROVIDED 20 SPACES
BUILDING HEIGHT MAXIMUM BUILDING HEIGHT PER 504.3 = 75' *HEIGHT, NUMBER OF STORIES AND ALLOWABLE AREA CALCULATED BASED ON THE MOST RESTRICTIVE OCCUPANCY ALLOWANCE PER § 508.3, IN THIS CASE F1-S CLEAN AIR STALL EVSE 9' X 19' 13 - STALLS
GROSS ±320,139 S.F.

TOTAL AREA

ALL BUILDINGS
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
162,068 S.F.

OFFICE PARKING 1/250
PARKING REQUIRED :
8,500/ 250 = 34 STALLS
20,000/ 1000 = 20 STALLS
20,000/ 2000 = 10 STALLS
110,048/ 4000 = 28 STALLS
92 STALLS
150,048 S.F.
3,500 S.F.
153,548 S.F.

TOTAL PARKING REQUIRED
COMPACT STALLS (25%MAX) 8'-6" X 17' 33 - STALLS
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

WAREHOUSE PARKING 1/2000 SECOND 20,000
WAREHOUSE PARKING 1/1000 FIRST 20,000
1021-052-09-0-000
1021-052-06-0-000
1021-052-11-0-000
TRUCK PARKING PROVIDED 10 SPACES

0.51 ALLOWABLE FAR:

FAR:

0.60 BUILDING 1 158,548 S.F.
(M) TENANT SPACES & RESTROOMS**
(M) INDOOR SEATING AREAS
(M) OUTDOOR SEATING AREAS*

TOTAL FOOTPRINT
FIRST
FLOOR
3,520 S.F.

N/A
3,600 S.F.
3,520 S.F.

F & B BUILDING 3,520 S.F.

BUILDING 1

F & B BUILDINGS
TOTAL PARKING REQUIRED 128
OCCUPANCIES B-S1-F1-M

OCCUPANCIES B & M
3,600 / 100 = 36 STALLS
WAREHOUSE PARKING 1/4000 EXCESS
RESTAURANT SEATING AREAS 1/100
CONTRIBUTES TO PARKING CALCULATIONS BUT NOT TO BUILDING AREA* CONTRIBUTES TO BUILDING AREA BUT NOT TO PARKING CALCULATIONS** M : MERCANTILE
RATIO OF IMPERVIOUS SURFACE: EXISTING 30 % PROPOSED 88% TRUCK PARKING REQUIRED (1 PER EA 2 LOADING) 10 SPACES
SITE OAKS AVE.
5/29/2025 12:39 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A103 TRUCK ACCESS PLAN.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007 ST A T E OF CA L FI OR I N AC-34996 RENEWAL DATE 10/31/2019 GI NAC I O CRESPO I L CENSED ARCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS: - - - architecture O.C. DESIGN & ENGINEERING (S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
150,048 S.F.
3,500 S.F.
153,548 S.F.
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

BUILDING 1 158,548 S.F.

OCCUPANCIES B-S1-F1-M
PROVIDE "0"

CURB TO
ACCESS

MONITORING
WELL
(M) TENANT SPACES & RESTROOMS**
(M) INDOOR SEATING AREAS
(M) OUTDOOR SEATING AREAS*

TOTAL FOOTPRINT
FIRST
FLOOR
3,520 S.F.

N/A
3,600 S.F.
3,520 S.F.

F & B BUILDING 3,520 S.F.

OCCUPANCIES B & M 0 10' 25' 50' 100' 200'

GRAPHIC SCALE
SCHAEFER AVE. OAKS AVE.
51'-8" 56'-0" TYPICAL
STUD WALL / CONTAINER WALL, TYPICAL 13456

CONCRETE TILT UP WALL, TYPICAL
KEY NOTES: 2 3HR FR CONCRETE TILT UP WALL @ REDUCED YARD 10'-0 HIGH CONCRETE TILT UP SCREEN WALL, COLOR AND
REVEALS TO MATCH THE BUILDING, SEE ELEVATIONS.
10'-0 WROUGHT IRON SLIDING GATE, WITH 1" SQUARE TUBE STEEL PICKETS SPACED AT 6" O.C., PROVIDE PERFORATED SHEET METAL AFFIXED TO THE INSIDE SURFACE PROVIDING MINIMUM 50% SCREEN. PROVIDE FIRE

DEPARTMENT KNOX BRAND KEY SWITCH COMPLIANT WITH ONTARIO FD STANDARDS #B-003, #B-004 & #H-001 PROVIDE ELECTRICAL CONDUIT FOR

GATE OPENER FUTURE USE
(N) 8'-0 WROUGHT IRON FENCE 1 2 1 1 2 1 1 3 4 4 5 5 6 6 6 6 7 (E) 8'-0 WROUGHT IRON FENCE 2 1/8" = 1'-0" FENCE ELEVATION 3 1/8" = 1'-0"
FENCE ELEVATION 4 1/8" = 1'-0"
W.I. FENCE ELEVATION, TYP. 8'-0" 11'-0" 1'-0" 10'-0"
3'-6" 1 11'-0" 10'-0" 1'-0"
3'-6" 1'-0" 10'-0"
4" O.C.
1" SQUARE PICKET
1" SQUARE PICKET 1 4 4 4 6 5
1" SQUARE PICKET 5 2 3 4
F & B BUILDINGS 3 3 3 3

CORTEN STEEL CLADDING

CORTEN STEEL CLADDING
122 213
4/14/2025 3:49 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A100.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007 ST A T E OF CA L FI OR I N AC-34996 RENEWAL DATE 10/31/2019 GI NAC I O CRESPO I L CENSED ARCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS: - - - architecture O.C. DESIGN & ENGINEERING A200 FIRST FLOOR PLAN INDICATED A220 1

STUD WALL, TYPICAL
STEEL COLUMN (TYP.) 123456789
10 9' X 10' DOCK HIGH DOOR, TYPICAL

CONCRETE TILT UP WALL, TYPICAL
11 GLAZING, TYPICAL
3' X 7' HOLLOW METAL PAINTED TO MATCH THE

BUILDING, TYPICAL
6' X 7' FULL LITE DOUBLE DOORS, TYPICAL

CONCRETE SLAB PER STRUCTURAL
12 BUILDING ENTRANCE.

KEY NOTES:
12' X14' TRUCK DOOR (GRADE LEVEL)

WAREHOUSE
13 DOCK LEVELER, TYPICAL

ROOF DRAIN, TYPICAL

FIRE RISER, TYPICAL
SCALE 1" = 20'-0"
1 FIRST FLOOR PLAN BUILDING 1 4
308'-8" 228'-0"
176'-0" 48'-0" 4'-0"
536'-8" 290'-0" 46'-0" 240'-0" 76'-0" 366'-0"
196'-8" 340'-0"
13'-0" 43'-8"
536'-8" 4'-0" 4'-0"
56'-0" 84'-0" 48'-0" 120'-0" 120'-0" 48'-0" 58'-0" 370'-0" 2A 3HR FR CONCRETE TILT UP WALL, @ REDUCED
YARD 1 2
2A 2 2
2A 2 2 3 4 5 6 57 8 9 9
12 11 10
12 13
13 312'-0" 58'-0" 96'-0" 116'-0" 96'-0"
123 214
4/14/2025 3:50 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A100.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007 ST A T E OF CA L FI OR I N AC-34996 RENEWAL DATE 10/31/2019 GI NAC I O CRESPO I L CENSED ARCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS: - - - architecture O.C. DESIGN & ENGINEERING SCALE 1" = 20'-0"
1 MEZZANINE PLAN BUILDING 1

OPEN TO

WAREHOUSE
BELOW
A220 2 A210 MEZZANINE PLAN INDICATED

STUD WALL, TYPICAL
STEEL COLUMN (TYP.) 1234567

CONCRETE TILT UP WALL, TYPICAL

GLAZING, TYPICAL
KEY NOTES:

ROOF DRAIN, TYPICAL

FIRE RISER, TYPICAL
CLERESTORY WINDOW AT WAREHOUSE, TYPICAL 5
2A 3HR FR CONCRETE TILT UP WALL @ REDUCED
YARD 3
308'-8" 228'-0"
176'-0" 48'-0" 4'-0"
536'-8" 290'-0" 46'-0" 240'-0" 76'-0" 366'-0"
196'-8" 340'-0"
13'-0" 43'-8"
536'-8" 4'-0" 4'-0"
56'-0" 84'-0" 48'-0" 120'-0" 120'-0" 48'-0" 58'-0" 370'-0" 312'-0" 96'-0" 116'-0" 96'-0" 1 1 2 2 2 2 2A 2 2
2A 4 4 5 6 7
124 215
4/14/2025 3:50 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A100.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007 ST A T E OF CA L FI OR I N AC-34996 RENEWAL DATE 10/31/2019 GI NAC I O CRESPO I L CENSED ARCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS: - - - architecture STUD WALL, TYPICAL O.C. DESIGN & ENGINEERING
STEEL COLUMN (TYP.) 123456789
10 CONCRETE TILT UP WALL, TYPICAL
11 STAIRS TO MEZZANINE

GLAZING, TYPICAL
3' X 7' HOLLOW METAL PAINTED TO MATCH THE

BUILDING, TYPICAL
6' X 7' FULL LITE DOUBLE DOORS, TYPICAL

CONCRETE SLAB PER STRUCTURAL
12 BUILDING ENTRANCE.

KEY NOTES:

SCALE 1/8" = 1'-0"
1 FIRST FLOOR OFFICE PLAN
SCALE 1/8" = 1'-0"
2 MEZZANINE FLOOR PLAN
42" HIGH GUARD, TYPICAL

MEZZANINE
OFFICE
± 5,000 S.F.

OPEN
OFFICE

HVAC SHAFT

DISABLED ACCESSIBLE RESTROOMS, TYPICAL

OPEN TO
WAREHOUSE BELOW A220 ENLARGED OFFICE PLAN INDICATED

CONFERENCE
ROOM
OPEN
OFFICE

PRIVATE
OFFICE

WAREHOUSE

STORAGE
LOBBY
OPEN
TO
BELOW
13 ROOF ACCESS HATCH ABOVE
14 GLASS GUARDRAIL WITH HANDRAIL 6

PRIVATE
OFFICE

PRIVATE
OFFICE
LUNCH
ROOM

CONFERENCE
ROOM

WAREHOUSE
24'-8"

ELECTRICAL
ROOM
111'-11" 52'-6"
99'-8" 54'-1" 12'-0" 12'-0" 12'-0" 7'-6" 5'-7"

PRIVATE
OFFICE

STORAGE
UNDER
MEZZA 11'-5" 13'-9"
11'-11" 7'-0"
24'-10" 7'-8" 5'-0" 10'-8" 11'-7" 12'-0" 24'-8" 11'-10" 16'-6"

FIRST FLOOR
OFFICE
± 3,500 S.F. 1 2 2 2 2 2 3 3 3 3 4 5 55 5 24'-1" 6 6 7 8 9 10 11
11 11
11 12
13 14
12 14 34'-2"
125 216
MA1.3
MA1.2
2 MA1.4
1 1
1 MA1.5
03 MA1.6
A
C
1 2 3 4 5 6 7 8
160 SF
WOMENS
160 SF
MENS
80 SF

STORAGE
80 SF

STORAGE
80 SF

STORAGE
80 SF

STORAGE
720 SF

F & B TENANT
720 SF

F & B TENANT
720 SF

F & B TENANT
720 SF

F & B TENANT
MA1.3
2 02
MA1.6
B

SCHAEFER AVENUE
(PUBLIC STREET)

PLANTER
AREA = 86 S.F.

PLANTER
AREA =
79 S.F.

PLANTER
AREA =
79 S.F.

PLANTER
AREA =
79 S.F.

PLANTER AREA = 1651 S.F.

PLANTER AREA = 5719 S.F.

PLANTER AREA = 512 S.F. PLNATER AREA = 581 S.F.
3600 SF

OUTSIDE

SEATING
7' - 4 1/4"
Concrete pad
for transformer

OUTDOOR WALKWAY

DECOMPOSED GRANITE

WITH BINDING AGENT

CONCRETE WITH
EXPANSION JOINS EVERY 8'

GROUND MATERIAL LEGEND
-
C-34996

RENEWAL DATE
10/31/2019

SHEETCHINO GATEWAY INDUSTRIAL
OF SHEETS DATE: DRAWN:

SCALE: PROJECT NO.

I.C.

CONTENTS: CLIENT: REVISIONS:
-
-
5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER

STA T E
OF
CA
L

FI OR I N A

GI NAC I O
CRESPO

I L CENSED
A

RCHITECT GATEWAY TERMINAL

CHINO GETAWAY INDUSTRIAL
architecture 13925 CITY CENTER DR.

SUITE 200
CHINO HILLS, CA 91709
7901 CROSSWAY DRIVE
PICO RIVERA, CA 90660
TEL 562.942.9804
April 15, 2025
A-24-007

FLOOR PLAN
MA1.1
1" = 10'-0" 1 FLOOR PLAN
N
PLANTER AREA = 929 S.F.

PARKWAY PLANTER = 314 S.F.

PARKWAY PLANTER = 1585 S.F.

PLANTER AREA = 1275 S.F.

PARKWAY PLANTER = 632 S.F.

PLANTER AREA = 1907 S.F.
126 217

BLANK PAGE INSERTED FOR

ELIMINATED ADDITIONAL

FLOOR PLAN
127 218
6/18/2025 4:58 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A300.dwg SHEET
OF SHEETS DATE: DRAWN:

SCALE: PROJECT NO. 07-23-2024 I.C.

A-24-007

ST A T E OF CA L FI OR I N
A
C-34996

RENEWAL DATE
10/31/2019

GI NAC I O CRESPO
I L

CENSED ARCHITECT
7901 CROSSWAY DRIVE
PICO RIVERA, CA 90660
TEL 562.942.9804

CHINO GATEWAY INDUSTRIAL
5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC
13925 CITY CENTER DR.

SUITE 200
CHINO HILLS, CA 91709
CLIENT: REVISIONS:
-
-
- architecture
O.C. DESIGN &

ENGINEERING
1 - NORTH ELEVATION @ SCHAEFER AVE.2 - EAST ELEVATION @ OAKS AVE. 3 - SOUTH ELEVATION 4 - WEST ELEVATION SCALE 1= 20'-0" QUAD 1' O.C. FORM LINER REVEAL PAINTED TO MATCH CORTEN STEEL PATINA, TYPICAL A300

ELEVATIONS
INDICATED DETAIL - C TYP. PANEL JOINT DETAIL - A
3 4
"
2"
3 4
"
3 4
" 1
2 " 3
4 " 2"
3 4
" 1
2 " DETAIL - B 2" HORIZONTAL REVEAL
3 4
"
3 4
" 2" 3
4 " 3
4 " 1
2 " 2" VERTICAL REVEAL PANEL JOINT, TYPICAL, SEE DETAIL "A" CONCRETE FINISH EXPOSED CONSTRUCTION CORRUGATED & STRUCTURAL CORTEN STEE; CANOPY FASCIA & SPANDREL GLASS, TYPICAL SOFFIT FACE HORIZ. REVEAL, TYPICAL, SEE DETAIL "B" HIGH PARAPET TO COVER HVAC UNITS 5 - LINE OF SIGHT PARAPET AT OFFICE AREA +- 6' HIGH HVAC UNIT, TYPICAL @ OFFICE AREA COMPLETELY SCREENED FROM VIEW FROM THE RIGHT OF WAY BY THE WALL PARAPETS. 50'-0" SETBACK AT OFFICE AREA SCALE 1= 20'-0" SCALE 1= 20'-0" SCALE 1= 20'-0" 14'-0"
MEZZA.
36'-0" CLEAR
43'-0"
45'-0"
46'-4"
36'-0" CLEAR
43'-0"
36'-0" CLEAR
43'-0"
44'-4"
14'-0"
MEZZA.
36'-0" CLEAR
42'-0"
46'-4"
36'-0" CLEAR
42'-0"
SEE

GRADING PLANS
36'-0" CLEAR
43'-0" SEE

GRADING
PLANS SCALE 1= 20'-0" SPANDREL GLASS, TYPICAL SPANDREL GLASS, TYPICAL CONCRETE FINISH EXPOSED CONSTRUCTION WAINSCOT CONCRETE FINISH EXPOSED CONSTRUCTION WAINSCOT CONCRETE FINISH EXPOSED CONSTRUCTION CONCRETE FINISH EXPOSED CONSTRUCTION CONCRETE FINISH EXPOSED CONSTRUCTION CONCRETE FINISH EXPOSED CONSTRUCTION WAINSCOT CONCRETE FINISH EXPOSED CONSTRUCTION WAINSCOT CONCRETE FINISH EXPOSED CONSTRUCTION WAINSCOT CORRUGATED & STRUCTURAL CORTEN STEE; CANOPY FASCIA & SOFFIT FACE QUAD 1' O.C. FORM LINER REVEAL PAINTED TO MATCH CORTEN STEEL PATINA, TYPICAL CORTEN STEEL CLADDING CORRUGATED CORTEN STEEL CLADDING, TYPICAL CORTEN STEEL CLADDING CORRUGATED CORTEN STEEL CLADDING, TYPICAL PANEL JOINT, TYPICAL, SEE DETAIL "A" HORIZ. REVEAL, TYPICAL, SEE DETAIL "B" PANEL JOINT, TYPICAL, SEE DETAIL "A" HORIZ. REVEAL, TYPICAL, SEE DETAIL "B" 1' O.C. FORM LINER REVEAL BELOW CLERESTORY WINDOW TYPICAL 1' O.C. FORM LINER REVEAL BELOW CLERESTORY WINDOW TYPICAL 1' O.C. FORM LINER REVEAL BELOW CLERESTORY WINDOW TYPICAL 1' O.C. FORM LINER REVEAL BETWEEN TRUCK DOORS TYPICAL 1' DEEP, 1 2" THICK CORTEN STEEL WINDOW CASING, TYPICAL AT SPANDREL / CLERESTORY 1' DEEP, 1 2" THICK CORTEN STEEL WINDOW CASING, TYPICAL AT SPANDREL / CLERESTORY 1' DEEP, 1 2" THICK CORTEN STEEL WINDOW CASING, TYPICAL AT SPANDREL / CLERESTORY 1' DEEP, 1 2" THICK CORTEN STEEL WINDOW CASING, TYPICAL AT SPANDREL / CLERESTORY 4" CORTEN STEEL COPING, TYPICAL 4" CORTEN STEEL COPING, TYPICAL 4" CORTEN STEEL COPING, TYPICAL 4" CORTEN STEEL COPING, TYPICAL 128 219
6'-0" 16 GA. RIBBED MTL. GATES W/ 2"x2"x1/4" STL. ANGLE FRAME AND BRACING 8'-0" MIN. CLR.
1-1/2" ROOF MTL. DECK, PER STRUC. DWG.
9'-0" 10'-0" HIGH CMU TRASH ENCLOSURE BACK WALL SEE SITE PLAN & ELEVATIONS. BUILDING, SEE FLOOR PLANS & ELEVATIONS 10" 10" HIGH BOTTOM SILL 3'-0" WIDE MIN. ADA ACCESS DOOR 34"MIN. 44"MAX.
6'-0" 8'-0" MIN. CLR.
1-1/2" ROOF MTL. DECK, PER STRUC. DWG.
9'-0" 10'-0" HIGH CMU TRASH ENCLOSURE BACK WALL SEE SITE PLAN & ELEVATIONS. 6'-0" 8'-0" MIN. CLR.
1-1/2" ROOF MTL. DECK, PER STRUC. DWG.
9'-0" SLOPE MIN. 1
4" PER 1'-0"
6'-0" 8'-0" MIN. CLR.
1-1/2" ROOF MTL. DECK, PER STRUC. DWG.
9'-0" SLOPE MIN. 1
4" PER 1'-0" 4/14/2025 3:53 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A300.dwg SHEET
OF SHEETS DATE: DRAWN:

SCALE: PROJECT NO. 07-23-2024 I.C.

A-24-007

ST A T E OF CA L FI OR I N
A
C-34996

RENEWAL DATE
10/31/2019

GI NAC I O CRESPO
I L

CENSED ARCHITECT
7901 CROSSWAY DRIVE
PICO RIVERA, CA 90660
TEL 562.942.9804

CHINO GATEWAY INDUSTRIAL
5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC
13925 CITY CENTER DR.

SUITE 200
CHINO HILLS, CA 91709
CLIENT: REVISIONS:
-
-
- architecture
O.C. DESIGN &
ENGINEERING SCALE 1/16" = 1'-0" 2 - CITY SCAPE PARTIAL NORTH ELEVATION @ SCHAEFER AVE. 4 - CITY SCAPE EAST ELEVATION @ OAKS AVE. SCALE 1/16" = 1'-0" 45'-0"
46'-4"
43'-0"
36'-0" CLEAR
A301

ELEVATIONS

INDICATED
18'-7" DETAIL - C TYP. PANEL JOINT DETAIL - A
3 4
"
2"
3 4
"
3 4
" 1
2 " 3
4 " 2"
3 4
" 1
2 " DETAIL - B 2" HORIZONTAL REVEAL
3 4
"
3 4
" 2" 3
4 " 3
4 " 1
2 " 2" VERTICAL REVEAL
4'-4" SCALE 1/16" = 1'-0" 3 - CITY SCAPE PARTIAL NORTH ELEVATION @ SCHAEFER AVE. 46'-4"
14'-0"
MEZZA.
3'-4" SCALE 1/32" = 1'-0" 1 - CITY SCAPE NORTH ELEVATION @ SCHAEFER AVE. SCALE 1/16" = 1'-0" 5 - TRASH ENCLOSURE PLAN & ELEVATIONS 5D 5A - T.E. FLOOR PLAN 5B - T.E. ELEVATION 5C - T.E. ELEVATION 5D - T.E. ELEVATION 5E - T.E. ELEVATION 5E 5B 5C 5'-0"
4'-6" 7'-8"
12'-9" 15'-7"
36'-0" CLEAR
129 220

FIRST FLOOR
0' - 0"
TOP CONTAINER 1
8' - 10 3/4"

CONTAINER BASE
-0' - 6"
87654
TOP CONTAINER 2
18' - 4 3/4"
40' - 0" 38' - 9" 40' - 0" 40' - 0"
158' - 9"
12' - 3 1/2" 12' - 3 1/2"
11' - 1 3/4"
11 06
01 07
06 01 01
11 01
06 04 04 04 04
12 07
1717 020

FIRST FLOOR
0' - 0"
TOP CONTAINER 1
8' - 10 3/4"

CONTAINER BASE
-0' - 6"
4321
TOP CONTAINER 2
18' - 4 3/4"
40' - 0" 38' - 9" 40' - 0"
118' - 9"
12' - 3 1/2"
06 11
06 04 01 01 01
11 07 12 07 12
01 04 04
02 17
-
C-34996

RENEWAL DATE
10/31/2019

SHEETCHINO GATEWAY INDUSTRIAL
OF SHEETS DATE: DRAWN:

SCALE: PROJECT NO.

I.C.

CONTENTS: CLIENT: REVISIONS:
-
-
5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER

STA T E OF CA L FI OR I N A
G
I

NAC I O CRESPO I L CENSED ARCHITECT GATEWAY TERMINAL

CHINO GETAWAY INDUSTRIAL
architecture 13925 CITY CENTER DR.

SUITE 200
CHINO HILLS, CA 91709
7901 CROSSWAY DRIVE
PICO RIVERA, CA 90660
TEL 562.942.9804
April 15, 2025
A-24-007

ELEVATIONS
MA1.2
3/16" = 1'-0"
1 NORTH ELEVATION
3/16" = 1'-0"
2 NORTH ELEVATION B

SEE MATERIALS DETAILS IN NEXT PAGE
130 221

FIRST FLOOR
0' - 0"
TOP CONTAINER 1
8' - 10 3/4"

CONTAINER BASE
-0' - 6"
5678
TOP CONTAINER 2
18' - 4 3/4"
40' - 0" 38' - 9" 40' - 0"
118' - 9"
12' - 3 1/2" 12' - 3 1/2"
06 04
07 12
11 06
11 06
1717

FIRST FLOOR
0' - 0"
TOP CONTAINER 1
8' - 10 3/4"

CONTAINER BASE
-0' - 6"
12345
TOP CONTAINER 2
18' - 4 3/4"
40' - 0" 38' - 9" 40' - 0" 40' - 0"
158' - 9"
12' - 3 1/2" 12' - 3 1/2"
06 11
06 11
06 06
06 07
12 04
1717
-
C-34996

RENEWAL DATE
10/31/2019

SHEETCHINO GATEWAY INDUSTRIAL
OF SHEETS DATE: DRAWN:

SCALE: PROJECT NO.

I.C.

CONTENTS: CLIENT: REVISIONS:
-
-
5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER

STA T E OF CA L FI OR I N A
G
I

NAC I O CRESPO I L CENSED ARCHITECT GATEWAY TERMINAL

CHINO GETAWAY INDUSTRIAL
architecture 13925 CITY CENTER DR.

SUITE 200
CHINO HILLS, CA 91709
7901 CROSSWAY DRIVE
PICO RIVERA, CA 90660
TEL 562.942.9804
April 15, 2025
A-24-007

ELEVATIONS
MA1.3
3/16" = 1'-0"
1 SOUTH ELEVATION
3/16" = 1'-0"
2 SOUTH ELEVATION B

MATERIAL BOARD
Material Description Comments
01 Corten Steel Planter Boxes Containers are Corten Steel - Rusted, Sealed and Clear Coated 02 Board Form Concrete
03 Custom steel green wall fencing system
04 Corten Steel Corrugated Panels - Fencing Corrugated Metal Fencing, Horizontal Corten Steel - Rusted, Sealed and Clear Coated 05 Corten Steel wall panels
06 Rusted and sealed corten steel Containers are Corten Steel - Rusted, Sealed and Clear Coated 07 Corten Steel Custom Outdoor Lighting - Corten Steel - Rusted, Sealed and Clear Coated 08 Decomposed Granite Gold
09 New concrete sidewalk
10 Art walls
11 Metal Mechanical Screen Metal Mechanical Screen Corten Steel - Rusted, Sealed and Clear Coated, holes not to exceed .25" 12 Rebar Fencing Rebar Fencing, Horizontal - Rusted, Sealed and Clear Coated 13 Field Color DE6347 Shining Knight
14 Accent 1 DE6344 Wisp of Smoke
15 Accent 2 DE6356 Sheet Metal
16 Canopy Cladding Tricorn Black
17 Vision Glass PPG SOLARBAN 60 (2) DUAL GLAZING
18 Spandrel PPG SPANDREL PPG SOLAR GRAY LOW-E
SOLARBAN 60 W/ GRAY BACKING
131 222

FIRST FLOOR
0' - 0"
TOP CONTAINER 1
8' - 10 3/4"

CONTAINER BASE
-0' - 6"
AC
TOP CONTAINER 2
18' - 4 3/4"
B
12' - 3 1/2"
11' - 1 1/2"
06 06 06
06 07
12 11
01 02

FIRST FLOOR
0' - 0"
TOP CONTAINER 1
8' - 10 3/4"

CONTAINER BASE
-0' - 6"
CA
TOP CONTAINER 2
18' - 4 3/4"
B
12' - 3 1/2"
11' - 1 1/2"
06 06 06
06 11
01 12
07 0202
-
C-34996

RENEWAL DATE
10/31/2019

SHEETCHINO GATEWAY INDUSTRIAL
OF SHEETS DATE: DRAWN:

SCALE: PROJECT NO.

I.C.

CONTENTS: CLIENT: REVISIONS:
-
-
5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER

STA T E OF CA L FI OR I N A
G
I

NAC I O CRESPO I L CENSED ARCHITECT GATEWAY TERMINAL

CHINO GETAWAY INDUSTRIAL
architecture 13925 CITY CENTER DR.

SUITE 200
CHINO HILLS, CA 91709
7901 CROSSWAY DRIVE
PICO RIVERA, CA 90660
TEL 562.942.9804
April 15, 2025
A-24-007

ELEVATIONS
MA1.4
1/4" = 1'-0"
1 WEST ELEVATION
1/4" = 1'-0"
2 EAST ELEVATION

MATERIAL BOARD
Material Description Comments
01 Corten Steel Planter Boxes Containers are Corten Steel - Rusted, Sealed and Clear Coated 02 Board Form Concrete
03 Custom steel green wall fencing system
04 Corten Steel Corrugated Panels - Fencing Corrugated Metal Fencing, Horizontal Corten Steel - Rusted, Sealed and Clear Coated 05 Corten Steel wall panels
06 Rusted and sealed corten steel Containers are Corten Steel - Rusted, Sealed and Clear Coated 07 Corten Steel Custom Outdoor Lighting - Corten Steel - Rusted, Sealed and Clear Coated 08 Decomposed Granite Gold
09 New concrete sidewalk
10 Art walls
11 Metal Mechanical Screen Metal Mechanical Screen Corten Steel - Rusted, Sealed and Clear Coated, holes not to exceed .25" 12 Rebar Fencing Rebar Fencing, Horizontal - Rusted, Sealed and Clear Coated 13 Field Color DE6347 Shining Knight
14 Accent 1 DE6344 Wisp of Smoke
15 Accent 2 DE6356 Sheet Metal
16 Canopy Cladding Tricorn Black
17 Vision Glass PPG SOLARBAN 60 (2) DUAL GLAZING
18 Spandrel PPG SPANDREL PPG SOLAR GRAY LOW-E
SOLARBAN 60 W/ GRAY BACKING
132 223

PARKWAY PLANTER
= 642 S.F.

PLANTER AREA
= 1,079 S.F.

PARKWAY

PLANTER
= 73 S.F.

PLANTER
AREA =
593 S.F. PARKWAY PLANTER = 712 S.F.

PLANTER
AREA
= 553 S.F.* PLANTER AREA
= 3,646 S.F.

PLANTER
AREA =
5,801 S.F.*

PLANTER AREA
= 989 S.F.

PLANTER AREA
= 4,848 S.F.*

PARKWAY PLANTER
= 537 S.F.

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT 22 S.F.

PLANTER
AREA =
3,263 S.F.*

PLANTER
AREA =
5,719 S.F.*

PLANTER
AREA =
1,651 S.F.

PLANTER AREA
= 581 S.F. PLANTER AREA
= 512 S.F.

PLANTER
AREA =
1,907 S.F.

PLANTER AREA
= 1,275 S.F. PLANTER
AREA =
929 S.F.

PLANTER
AREA =
79 S.F. PLANTER
AREA =
79 S.F. PLANTER
AREA =
79 S.F. COMPACT

COMPACT

PLANTER
AREA =
86 S.F. COMPACT COMPACT
MENS
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT WOMENS

STORAGE STORAGE STORAGE STORAGE

OUTDOOR

SEATING AREA OUTDOORSEATING AREA

PARKWAY PLANTER
= 314 S.F. PARKWAY PLANTER
= 1,585 S.F. PARKWAY PLANTER
= 632 S.F. 1021-052-04-0-000
CBC 2022
M1- LIGHT INDUSTRIAL

III-B, FULLY

SPRINKLERED
· (1) NEW CONCRETE TILT UP WAREHOUSE / OFFICE BUILDING AS DESCRIBED BELOW · (1) NEW SHIPPING CONTAINER FOOD AND BEVERAGE BUILDING AS DESCRIBED BELOW ASSESSOR'S PARCEL NO:

BUILDING CODE

BUILDING TYPE
BLDG. OCCUPANCY

DESCRIPTION

PROJECT
ZONING
AREAS
LAND AREA :

DESCRIPTION

PROJECT DATA
S1 : WAREHOUSE
B : OFFICE

AREA JUSTIFICATION

CONSTRUCTION TYPE III-B WITH FULLY SUPERVISED AUTOMATIC FIRE SPRINKLER SYSTEMS UNLIMITED AREA WITH 60' YARDS ALL AROUND, THE YARDS CAN BE REDUCED TO 40' IN NO MORE THAN 75% OF THE PERIMETER

49.0%
257 - STALLS
ACCESSIBLE (8' RAMP) 4 - STALLS
PARKING PROVIDED:

TOTAL
17' X 20'
ALLOWABLE LOT COVERAGE:

COVERAGE :

50.0%
ACCESSIBLE (STANDARD) 14' X 20' 4 - STALLS
13 SPACES

PARCEL SIZE
STANDARD STALLS 9' X 19' 165 - STALLS

LANDSCAPED AREA REQUIRED
10% OF PARCEL 32,014 S.F.

LANDSCAPED AREA PROVIDED =
33,733 S.F. AGGREGATE

PLANTER AREAS
NUMBER OF STORIES ALLOWABLE STORIES PER 504.4 = 3
BICYCLE RACK @ 5% OF PARKING

TRUCK LOADING REQUIRED
CLEAN AIR STALLS 9' X 19' 26 - STALLS
TRASH ENCL. AREA PROVIDED 430 S.F.

F1: MANUFACTURING
2 SPACES
TRUCK LOADING PROVIDED 2 SPACES
BUILDING HEIGHT MAXIMUM BUILDING HEIGHT PER 504.3 = 75' *HEIGHT, NUMBER OF STORIES AND ALLOWABLE AREA CALCULATED BASED ON THE MOST RESTRICTIVE OCCUPANCY ALLOWANCE PER § 508.3, IN THIS CASE F1-S CLEAN AIR STALL EVSE 9' X 19' 26 - STALLS
GROSS ±320,139 S.F.

TOTAL AREA

ALL BUILDINGS
(F1) MANUFACTURING
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
162,068 S.F.

OFFICE PARKING 1/250
PARKING REQUIRED :
8,500/ 250 = 34 STALLS
20,000/ 1000 = 20 STALLS
20,000/ 2000 = 10 STALLS
31,048/ 4000 = 8 STALLS
74,500 / 500 = 149 STALLS
221 STALLS
74,500 S.F.
75,548 S.F.
3,500 S.F.
153,548 S.F.

TOTAL PARKING REQUIRED
COMPACT STALLS (25%MAX) 8'-6" X 17' 32 - STALLS
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

WAREHOUSE PARKING 1/2000 SECOND 20,000
WAREHOUSE PARKING 1/1000 FIRST 20,000
1021-052-09-0-000
1021-052-06-0-000
1021-052-11-0-000
TRUCK PARKING PROVIDED 1 SPACES

0.51 ALLOWABLE FAR:

FAR:

0.60 BUILDING 1 158,548 S.F.
(M) TENANT SPACES & RESTROOMS**
(M) INDOOR SEATING AREAS
(M) OUTDOOR SEATING AREAS*

TOTAL FOOTPRINT
FIRST
FLOOR
3,520 S.F.

N/A
3,600 S.F.
3,520 S.F.

F & B BUILDING 3,520 S.F.

BUILDING 1

F & B BUILDINGS
TOTAL PARKING REQUIRED 257
OCCUPANCIES B-S1-F1-M

OCCUPANCIES B & M
3,600 / 100 = 36 STALLS
MANUFACTURINg PARKING 1/500
RESTAURANT SEATING AREAS 1/100
CONTRIBUTES TO PARKING CALCULATIONS BUT NOT TO BUILDING AREA* CONTRIBUTES TO BUILDING AREA BUT NOT TO PARKING CALCULATIONS** M : MERCANTILE
RATIO OF IMPERVIOUS SURFACE: EXISTING 30 % PROPOSED 88% TRUCK PARKING REQUIRED (1 PER EA 2 LOADING) 1 SPACES
WAREHOUSE PARKING 1/4000 EXCESS
SITE OAKS AVE.
4/14/2025 3:45 PM - Y:\2024\A-24-007-Oaks & Shaeffer Chino\OAKS-PLANNING\OAKS-A100 ALT.dwg SHEET OF SHEETS DATE: DRAWN: SCALE: PROJECT NO. 07-23-2024 I.C.A-24-007

ST A T E
OF
C
A
L
FI OR I N AC-34996 RENEWAL DATE 10/31/2019

GI NAC I O
CRESPO

I L CENSED
A
RCHITECT 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 TEL 562.942.9804 CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA - CONRETE TILT UP WAREHOUSE / OFFICE BUILDING - UTR # 0180SCHAEFER CONTENTS: GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA 91709 CLIENT: REVISIONS:
-
-
- architecture O.C. DESIGN & ENGINEERING A100ALT 1 SITE PLAN INDICATED OFFICE
± 3,500 S.F. F.F.
± 5,000 S.F. MEZZ.
± 8,500 S.F.

CL
1 1" = 30'-0"

SITE PLAN
ACCESSIBLE PATH OF TRAVEL. 60" WIDE (MIN.)

CONCRETE TILT UP WALL
12' X14' TRUCK DOOR (GRADE LEVEL)
1 2
3 4
5 6
7 8
9 10
11 BUILDING ENTRANCE. AFFIX A 4" SQ. INTERNATIONAL ACCESSIBILITY SYMBOL PER CBC 11B-216.6 & FIRE DEPARTMENT KNOX BOX
PARKING STALL DOUBLE STRIPPING (PER CITY OF CHINO STDS.) TYPICAL

CONCRETE PAVING, PER CIVIL DRAWINGS
28'-0" WIDE MIN. & CLEAR TO THE SKY FIRE LANE PER THE

CITY OF CHINO'S FIRE DEPARTMENT STANDARDS

PREFABRICATED CONCRETE BUMPER, TYPICAL
TRASH ENCLOSURE, MIN. 6' HIGH SCREEN WALLS WITH METAL
DOORS (2-TRASH / RECYCLE BINS + 1 96 GALLON ORGANICS

RECYCLING BIN) PER CITY OF CHINO STANDARDS SEE
12 9' X10' TRUCK DOOR (DOCK HIGH) TYPICAL
13 14
(E) CURB AND GUTTER, TYP.
15 (E) LIGHT POLE, TYP.
16 (E) PUBLIC FIRE HYDRANT
17 (N) PRIVATE FIRE HYDRANT
18 10'-0 HIGH CONCRETE TILT UP SCREEN WALL, COLOR AND
REVEALS TO MATCH THE BUILDING, SEE ELEVATIONS.
19 10'-0 WROUGHT IRON SLIDING GATE, WITH 1" SQUARE TUBE STEEL PICKETS SPACED AT 6" O.C., PROVIDE PERFORATED SHEET METAL AFFIXED TO THE INSIDE SURFACE PROVIDING MINIMUM 50% SCREEN. PROVIDE FIRE DEPARTMENT KNOX BRAND KEY SWITCH COMPLIANT WITH ONTARIO FD STANDARDS #B-003, #B-004 & #H-001 PROVIDE ELECTRICAL CONDUIT FOR GATE OPENER FUTURE USE 20 8'-0 WROUGHT IRON FENCE
21 22

ENHANCED PEDESTRIAN ACCESS, TOP CAST ACID WASH CONCRETE GRAPHITE COLOR WITH SCORE LINES PER DESIGN.
23 EXTERIOR PATIO "BY OTHERS" SEE RAD PLANS.
24 CONCRETE STAIRS, MEDIUM BROOM FINISH TYPICAL. SEE GRADING PLANS FOR ELEVATIONS.
25 ENHANCED DRIVEWAY APPROACH, 6" MIN. THICK, 3500 PSI
26 TRACTOR TRAILER PARKING STALL, TYPICAL
27 EXISTING SIDEWALK.
28 LITHONIA KBC8 LED WHITE, LIGHTED BOLLARD AT ENTRY
29 30
LOCATION OF INTERIOR ROOF DRAIN, SEE CIVIL PLANS, TYP.
31 SITE PLAN KEYNOTES
32 BICYCLE RACK
33 PROPOSED LOCATION OF FIRE SPRINKLER RISER
34 6" DIAM. CONCRETE FILLED PIPE BOLLARD, TYPICAL.
3 HOUR CONCRETE TILT UP WALL W/ 3 HOUR JOINTS
3'X7' HOLLOW METAL MAN DOOR (TYPICAL)WITH 60"x60" LANDING.

PARKING SPACES FOR CLEAN AIR VEHICLE / CARPOOL PARKING
NO SMOKING SIGNAGE WITHIN 25'-0" OF BUILDING ENTRIES, OUTDOOR AIR INTAKES, OPERABLE WINDOWS, AND WITHIN THE BUILDING.

CONCRETE APRON: 6" THICK CONCRETE PAVING OVER 4" CLASS 2 AGREGATE OVER 12" (90%) COMPACTED SUBGRADE, 3,000 PSI W/ #3 REBAR @ 18" O.C.

EACH WAY, 4" SLUMP CONTROL JOINTS AT 20'-0" O.C. EACH WAY, HEAVY

BROOM FINISH, SEE CIVIL PLANS
1A

DROUGHT TOLERANT LANDSCAPE W/AUTOMATIC IRRIGATION SYSTEM SEE LANDSCAPING DWGS. MOUND LANDSCAPE WHERE PATH OF TRAVEL OCCURS TO PROVIDE 3" MAX. GRADE ELEVATION DIFFERENCE, TYPICAL 35 36
37 38
39 40
41 42
RUBBER BUMPER BY OTHERS, TYPICAL., PROVIDE EDGE OF
DOCK LEVELERS WHERE NO PIT LEVELER IS PROVIDED.

FUTURE EVSE LOCATION COMPLIANT TO CGBSC § 5.106.5.3.2

SEE ELECTRICAL PLANS
43 PIT STYLE DOCK LEVELER, TYPICAL EVERY OTHER TRUCK DOOR

ACCESSIBLE PARKING, TYP
6" WIDE MOWSTRIP @ PROPERTY LINE, TYPICAL

NOT TO SCALE

VICINITY MAP
SCHAEFER AVE.

CL
(F1) MANUFACTURING
(S1) WAREHOUSE
(B) OFFICE

TOTAL FOOTPRINT
FIRST
FLOOR
MEZZA
FLOOR
74,500 S.F.
75,548 S.F.
3,500 S.F.
153,548 S.F.
(B) OFFICE

TOTAL MEZZANINE
5,000 S.F.
5,000 S.F.

OCCUPANCIES B-S1-F1-M
0 10' 25' 50' 100' 200'

GRAPHIC SCALE
44 45
DESIGNATED SMOKING AREA FURTHER THAN 25' AWAY FROM
BUILDING DOORS AND VENTILATION OPENINGS.
46 TRANSFORMER PAD, SCREENED WITH LANDSCAPING
MATERIAL, COORDINATE WITH THE UTILITY EXACT LOCATION.
(E) POWER POLE, TO BE RELOCATED
(N) PUBLIC FIRE HYDRANT
47 FORKLIFT RAMP, SEE CIVIL DRAWINGS
2 1" = 30'-0" PROPOSED LOCATION OF PIV VALVE COMPLETELY SCREENED SCHAEFFER AVE. STREET SECTION
3 1" = 30'-0"
OAKS AVE. STREET SECTION
R.O.W.

PLANTER
(E) SIDEWALK
(E) PAVEMENT

PL CL PL

PL CL PL UTILITY EASEMENT TO BE QUITCLAIMED

INGRESS / EGRESS & PARKING EASEMENT
R.O.W.

PLANTER
(E) SIDEWALK
(E) PAVEMENT
SCHAEFER AVE. OAKS AVE.STOCKTON AVE. 19'-6"
249'-3" PROPOSED PROPERTY LINE 510'-9" PROPERTY LINE
361'-5" PROPOSED PROPERTY LINE 98'-6" PROPERTY LINE 147'-6" PROPERTY LINE 163'-1" PROPERTY LINE
366'-11" PROPERTY LINE 330'-2" PROPOSED PROPERTY LINE 70'-9" PROPOSED PROPERTY LINE 14'-0" 36'-0" 50'-0" 8'-0"
30'-0"
22'-0"
381'-4" PROPOSED PROPERTY LINE
8'-6" 5'-6" 2'-0"
14'-0" 36'-0"
50'-0" 50'-0"
2'-6" 5'-6" 2'-0"
8'-0" 22'-0"
30'-0"
100'-0"
60'-0"
120
110
190
90 80
70 60
50 40 20
1 PROPOSED PARCEL 2 ± 34,683 S.F.

PROPOSED
PARCEL 1
± 285,640 S.F.
10 60'-0" TYPICAL
56'-0" TYPICAL 42'-6" 1:1 SETBACK
(N) DRIVEWAY
40'-0"
(N) DRIVEWAY 42'-3"
536'-8" BUILDING DIMENSION 25'-0" SETBACK 312'-0" BUILDING DIMENSION 59'-5" BUILDING SEPARATION 49'-7" SETBACK19'-0" TYP. 17'-0" TYP. 19'-0"
TYP.
28'-0"
18 STALLS @ 8'-6" = 153'-0"
17'-0"
TYP.
10 STALLS @ 8'-6" = 85'-0"
17'-0"
TYP.
5 STALLS @ 9'-0" = 45'-0" 19'-0"
TYP. 9'-0" 8'-0"
18'-0" 18'-0" 9'-0" 5'-0"
3 STALLS @ 9'-0"
= 27'-0"
8'-0"
336'-0" BUILDING DIMENSION 240'-0" BUILDING DIMENSION 76'-0" BLDG. DIM. 12'-0"
TYP. 45'-0" TYPICAL
30'-0"
15 15'-0"
6" WIDE, 6" MIN. HIGH CONCRETE CURB, TYPICAL. CURB TO BE 1'

WIDE WHEN ADJACENT TO PARKING STALLS, SEE GRADING PLANS 48 BUILDING COLUMN PER STRUCTURAL, TYPICAL 9'-0" 9'-0"
130
200
10'-7" 125'-6"
30 28'-9" 54'-0"
45'-4"
1:1 SETBACK

F & B BUILDINGS
(N) DRIVEWAY
33'-0" 38'-0" 38'-0" 41'-3"
8'-6" 6 STALLS @ 9'-0" = 54'-0" 8 STALLS @ 9'-0" = 72'-0" 8 STALLS @ 9'-0" = 72'-0" 9'-0" 90'-10" PROPOSED PROPERTY LINE 368'-0" BUILDING DIMENSION 52'-0" BUILDING DIMENSION 536'-8" BUILDING DIMENSION
228'-0" BUILDING DIMENSION
12 STALLS @ 9'-0" = 108'-0" 8'-6" 8'-6"
308'-8" BUILDING DIMENSION
43'-8" BLDG. D.
13'-0"
BLDG. D.
56'-0" BLDG. D.
48'-0" BLDG. D. 120'-0" BLDG. D. 48'-0" BLDG. D. 120'-0" BLDG. D. 4'-0" TYP. 4'-0" TYP. 4'-0" 96'-0" BLDG. D. 116'-0" BLDG. D. 96'-0" BLDG. D. 19'-0" TYP. 19'-0"
TYP.
28'-0"
(N) DRIVEWAY 41'-3" 30'-2" 6'-11"
84'-0" BLDG. D.
33'-0"
SETBACK 30'-0" 30'-0" 9'-0" 8'-6"
17'-0"
18'-0"
74'-0" BUILDING SEPARATION 28'-0" MIN. TYPICAL
9'-0" 5'-0" 9'-0" 8'-6" 4 STALLS @ 9'-0" = 36'-0" 19'-0" TYP. 14 100 30'-0"
14 13A (E) LIGHT POLE TO BE RELOCAED
13A
14 1A
1 1 1A
1 1
1 1
10 3
3 4
4 4
5 6
6 8 7
9 9
9 2
10 11
11 11
12 12
13 13
13 13
15 15
16 17
17 17
17 17
18 18
19 19
20 20
20 20
27 22
23 23
23 24
24 24
24 25
26 21
38 28
29 29
29 29
30 31
31 31
32 32
32 32
33 34
35 36
36 37
37 38
28 38
39 39
41 41
42 43
44 45 44
46 47
48 MANUFACTURING
± 74,500 S.F. 19'-0" TYP.
19'-0"
TYP.
8 STALLS @ 9'-0" = 72'-0"
9'-0" 9'-0" 9'-0" 9'-0" 9'-0" 8 STALLS @ 9'-0" = 72'-0" 8 STALLS @ 9'-0" = 72'-0"
8 STALLS @ 9'-0" = 72'-0"
7 STALLS @ 9'-0" = 63'-0"
8 STALLS @ 9'-0" = 72'-0"
9 STALLS @ 9'-0" = 81'-0"
16 STALLS @ 9'-0" = 144'-0"16 STALLS @ 9'-0" = 144'-0"
14 STALLS @ 9'-0" = 126'-0"
8 STALLS @ 9'-0" = 72'-0"8 STALLS @ 9'-0" = 72'-0"8 STALLS @ 9'-0" = 72'-0"8 STALLS @ 9'-0" = 72'-0" 16 STALLS @ 9'-0" = 144'-0"
210
140
220
230
150
240 250
160
257
170
180
133 224

LINE OF SIGHT LINE OF SIGHT LINE OF SIGHT LINE OF SIGHT

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

COMPACT
COMPACT COMPACT MENS F & B TENANT 720 SQFT F & B TENANT 720 SQFT F & B TENANT 720 SQFT F & B TENANT 720 SQFT WOMENS STORAGE STORAGE STORAGE STORAGE OUTDOOR SEATING AREA OUTDOOR SEATING AREA

COMPACT COMPACT COMPACT

COMPACT (N) BUILDING
OAKS AVE. SCHAEFER AVE. REVISIONS BY p L E R T S A T i STERi l E h D GE PI T F O DATE 05-31-2027 RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y A SIGNATURE 0 A HC I R CE 4 T 24049 JOB NO. OF 7 SHEETS R.S. R.S. CHECKED DATE DRAWN SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,
CHINO, CA 05-28-2025 05-28-2025 L-5 PRELIMINARY LANDSCAPE PLAN p L E R T S A T i STERi l E h D GE PI T F O DATE 05-31-2025 RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y A SIGNATURE 0 A HC I R CE 4 T CERTIFICATION OF LANDSCAPE DESIGN I hereby certify that: (1) I am a professional appropriately licensed in the State of California to provide professional landscape design services. (2) The landscape design and water use calculations for the property located at (3) (provide street address or parcel number(s)) were prepared by me or under my supervision. (4) The landscape design and water use calculations for the identified property comply with the requirements of the City of Chino, CA, Water Efficient Landscape Ordinance (Municipal Code Chapter 13.18) and the City of Chino, CA, Water Efficient Landscape Guidelines. (5) The information I have provided in this Certificate of Landscape Design is true and correct and is hereby submitted in compliance with the City of Chino, CA, Water Efficient Landscape Guidelines. Print Name Date Signature License Number Address Telephone E-mail Address Landscape Design Professional's Stamp REDLANDS INDUSTRIAL 2810 REDLANDS AVE, PERRIS, CA LANDSCAPE AREA = 32,727 s.f. PHIL MAY LANDSCAPE ARCHITECTURE 2532 WALLACE AVE. FULLERTON, CA 92831 909-373-1959 LANDSCAPE ARCHITECT CONSULTANTS GATEWAY TERMINAL LLC 13925 CITY CENTER DR. SUITE 200 CHINO HILLS, CA91709 OWNER / DEVELOPER O.C. DESIGN & ENGINEERING 7901 CROSSWAY DRIVE PICO RIVERA, CA 90660 562-942-9804 ARCHITECT PLANT PICTURES PLAN PLANT PICTURES PLAN PLANT PICTURES PLAN NORTH COVER SHEET 0 20' 40' 80' SCALE: 1" = 40'-0" CHINO GATEWAY INDUSTRIAL 5885 SCHAEFER AVE., CHINO, CA ARCHITECTURAL LANDSCAPE PLANS SHEET INDEX L-1 COVER SHEET L-2 L-3 L-4 PRELIMINARY LANDSCAPE PLAN-2 L-6 05-28-2025 05-28-2025 L-7 COLOR LANDSCAPE PLAN 134 225
1 2 3 6 7 8 3 LINE OF SIGHT LINE OF SIGHT LINE OF SIGHT LINE OF SIGHT

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

COMPACT
COMPACT COMPACT MENS F & B TENANT 720 SQFT F & B TENANT 720 SQFT F & B TENANT 720 SQFT F & B TENANT 720 SQFT WOMENS STORAGE STORAGE STORAGE STORAGE OUTDOOR SEATING AREA OUTDOOR SEATING AREA

COMPACT COMPACT COMPACT

COMPACT (N) BUILDING
OAKS AVE. SCHAEFER AVE. TREES SHRUBS PERENNIALS GROUNDCOVERLANDSCAPE ELEMENTS PROPOSED 12345678 REVISIONS BY p L E R T S A T i STERi l E h D GE PI T F O DATE 05-31-2027 RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y A SIGNATURE 0 A HC I R CE 4 T 24049 JOB NO. OF 7 SHEETS R.S. R.S. CHECKED DATE DRAWN SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,
CHINO, CA 05-28-2025 05-28-2025 NORTH

PRELIMINARY
LANDSCAPE PLAN 0 15' 30' 60' SCALE: 1" = 30'-0" ALL LANDSCAPE INSTALLATION SHALL BE PERMANENTLY MAINTAINED. ALL LANDSCAPE AREAS SHALL RECEIVE AUTOMATIC IRRIGATION SYSTEM. ALL LANDSCAPE PLANS AND INSTALLATIONS SHALL ADHERE TO CITY OF CHINO DESIGN GUIDELINES, CODES AND REGULATIONS. COMPLIANCE STATEMENTI AM FAMILIAR WITH THE REQUIREMENTS FOR LANDSCAPE AND IRRIGATION PLANS CONTAINED IN THE WATER EFFICIENT LANDSCAPE REGULATIONS OF THE CITY OF CHINO. I HAVE PREPARED THIS PLAN IN COMPLIANCE WITH THOSE REGULATIONS, I CERTIFY THAT THE PLAN IMPLEMENTS THOSE REGULATIONS TO PROVIDE EFFICIENT USE OF WATER. p L E R T S A T i ST ERi l E h D GE IP T F O DATE RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y A SIGNATURE 0 A HC I R CE 4T 05-31-2025 ENLARGED AREA SEE SHEET L-3 05-28-2025 135 226
1 2 3 6 7 8 3 LINE OF SIGHT LINE OF SIGHT
COMPACT COMPACT COMPACT COMPACT TREES SHRUBS PERENNIALS GROUNDCOVER LANDSCAPE ELEMENTS PROPOSED 12345678 REVISIONS BY p L E R T S A T i STERi l E h D GE PI T F O DATE 05-31-2027 RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y A SIGNATURE 0 A HC I R CE 4 T 24049 JOB NO. OF 7 SHEETS R.S. R.S. CHECKED DATE DRAWN SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,
CHINO, CA 05-28-2025 05-28-2025 NORTH

PRELIMINARY
LANDSCAPE PLAN-2 0 5' 10' 20' SCALE: 1" = 10'-0" ALL LANDSCAPE INSTALLATION SHALL BE PERMANENTLY MAINTAINED. ALL LANDSCAPE AREAS SHALL RECEIVE AUTOMATIC IRRIGATION SYSTEM. ALL LANDSCAPE PLANS AND INSTALLATIONS SHALL ADHERE TO CITY OF CHINO DESIGN GUIDELINES, CODES AND REGULATIONS. COMPLIANCE STATEMENTI AM FAMILIAR WITH THE REQUIREMENTS FOR LANDSCAPE AND IRRIGATION PLANS CONTAINED IN THE WATER EFFICIENT LANDSCAPE REGULATIONS OF THE CITY OF CHINO. I HAVE PREPARED THIS PLAN IN COMPLIANCE WITH THOSE REGULATIONS, I CERTIFY THAT THE PLAN IMPLEMENTS THOSE REGULATIONS TO PROVIDE EFFICIENT USE OF WATER. p L E R T S A T i ST ERi l E h D GE IP T F O DATE RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y ASIGNATURE 0 A HC I R CE 4T 05-31-2025 05-28-2025 136 227

REVISIONS BY
p
L
E
R
T S
A T
i
STER
i l E
h D
GE
P
I
T
F O DATE 05-31-2027 RENEWAL DATE F C
A
O

L I N I A
R
1 3 PE
N
D
S
C
S . M
a
A
y A SIGNATURE
0 A
HC I
R
CE
4 T 24049 JOB NO. OF
7 SHEETS R.S. R.S. CHECKED DATE DRAWN SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,
CHINO, CA 05-28-2025 05-28-2025 TREES
PLANT
PICTURES - 1
137 228

REVISIONS BY
p
L
E
R
T S
A T
i
STER
i l E
h D
GE
P
I
T
F O DATE 05-31-2027 RENEWAL DATE F C
A
O

L I N I A
R
1 3 PE
N
D
S
C
S . M
a
A
y A SIGNATURE
0 A
HC I
R
CE
4 T 24049 JOB NO. OF
7 SHEETS R.S. R.S. CHECKED DATE DRAWN SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,
CHINO, CA 05-28-2025 05-28-2025 SHRUBS
PLANT
PICTURES -2
138 229
REVISIONS BY p L E R T S A T i STERi l E h D GE PI T F O DATE 05-31-2027 RENEWAL DATE F C A O L I N I A R 1 3 PE NDSC S . Ma A y A SIGNATURE 0 A HC I R CE 4 T 24049 JOB NO. OF 7 SHEETS R.S. R.S. CHECKED DATE DRAWN SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,
CHINO, CA 05-28-2025 05-28-2025 PERENNIALS GROUND COVERS PLANT
PICTURES - 3
139 230
1 2
3 6
78 3

LINE OF SIGHT

LINE OF SIGHT

LINE OF SIGHT

LINE OF SIGHT

COMPACT

COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT COMPACT

COMPACT

COMPACT COMPACT

MENS F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
F & B
TENANT
720 SQFT
WOMENS

STORAGE STORAGE STORAGE STORAGE

OUTDOOR

SEATING AREA

OUTDOOR

SEATING AREA

COMPACT COMPACT COMPACT
(N) BUILDING
OAKS AVE.

SCHAEFER AVE.

TREES
SHRUBS

PERENNIALS

GROUNDCOVER

LANDSCAPE ELEMENTS
PROPOSED 12345678
REVISIONS BY p L E
R
T S A T i
STER
i l E h D
GE
P
I
T
F O
DATE
05-31-2027

RENEWAL DATE F C A O L I
N I A R 1 3 PE
N
D
S
C
S
.

M
a
A
y A

SIGNATURE
0 A
HC I R CE 4T
24049
JOB NO.

OF
7 SHEETS
R.S.

R.S.

CHECKED
DATE
DRAWN
SHEET

CHINO GATEWAY

INDUSTRIAL
5885 SCHAEFER AVE.,

CHINO, CA
05-27-2025
05-27-2025
NORTH

PRELIMINARY

LANDSCAPE PLAN
0 15' 30' 60'
SCALE: 1" = 30'-0"
ALL LANDSCAPE INSTALLATION SHALL BE PERMANENTLY MAINTAINED.

ALL LANDSCAPE AREAS SHALL RECEIVE AUTOMATIC IRRIGATION SYSTEM.

ALL LANDSCAPE PLANS AND INSTALLATIONS SHALL ADHERE TO CITY OF CHINO DESIGN GUIDELINES, CODES AND REGULATIONS.

COMPLIANCE STATEMENT

I AM FAMILIAR WITH THE REQUIREMENTS FOR

LANDSCAPE AND IRRIGATION PLANS CONTAINED

IN THE WATER EFFICIENT LANDSCAPE
REGULATIONS OF THE CITY OF CHINO. I HAVE

PREPARED THIS PLAN IN COMPLIANCE WITH

THOSE REGULATIONS, I CERTIFY THAT THE PLAN

IMPLEMENTS THOSE REGULATIONS TO PROVIDE
EFFICIENT USE OF WATER.
p L E
R
T S A T i
ST ER
i l E h D
GE I
P
T
F O
DATE

RENEWAL DATE F C A O L I
N I A R 1 3 PE
N
D
S
C
.
a
S
M
A
y A

SIGNATURE
0 A
HC I R CE 4T
05-31-2025
05-27-2025
140 231
PARKWAY PLANTER = 829 S.F. PLANTER AREA = 1,025 S.F.

T T T T
10''S 10''S 10''S
8''W 8''W 8''W 8''W
W
W 12''W 12''W 12''W 36''SD 36''SD 4''W 4''W 4''W 4''W
G
G
10''W 10''W 10''W
G
E
T
T
T
T

COMPACT
COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACT COMPACT COMPACT PARKWAY PLANTER = 138 S.F. PLANTER AREA = 326 S.F. PARKWAY PLANTER = 1,183 S.F.

PARKWAY PLANTER = 712 S.F. PLANTER AREA = 86 S.F. PLANTER AREA = 1,596 S.F. PLANTER AREA = 218 S.F. PLANTER AREA = 4,396 S.F. PLANTER AREA = 316 S.F. PLANTER AREA = 240 S.F. PLANTER AREA = 56 S.F. PLANTER AREA = 245 S.F. PLANTER AREA = 239 S.F. PLANTER AREA = 2,371 S.F. PLANTER AREA = 1,633 S.F. PLANTER AREA = 113 S.F. PLANTER AREA = 309 S.F. PLANTER AREA = 556 S.F. PLANTER AREA = 4,843 S.F.

COMPACT COMPACT COMPACT PLANTER AREA = 528 S.F. PLANTER AREA = 317 S.F. PLANTER AREA = 445 S.F. PLANTER AREA = 456 S.F. PLANTER AREA = 1,028 S.F. COMPACTCOMPACT PLANTER AREA = 227 S.F.

PLANTER AREA
= 91 S.F.

PLANTER AREA
= 91 S.F. PLANTER AREA = 3,443 S.F. PLANTER AREA = 1,163 S.F. PLANTER AREA = 93 S.F. PLANTER AREA = 93 S.F. COMPACTCOMPACT COMPACT COMPACT NON SEATING HARDSCAPE AREA WITH PLANTERS AREA = 3,429 S.F. PLANTER AREA = 1,524 S.F. PLANTER AREA = 1,057 S.F. COMPACTCOMPACT PARKWAY PLANTER = 1,877 S.F. PARKWAY PLANTER = 95 S.F. PARKWAY PLANTER = 93 S.F. PARKWAY PLANTER = 425 S.F.

L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
“ ”
232 141
233 142
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
143 234
235 144
MENS F & B TENANT 720 SQFT F & B TENANT 720 SQFT F & B TENANT 720 SQFT F & B TENANT 720 SQFT WOMENS STORAGE STORAGE STORAGE STORAGE OUTDOOR SEATING AREA OUTDOOR SEATING AREA L L L L L L L L L L L L L L L L L L L L A101 G101H101I 101J 101 K101 B101 C101 D101 E101 F101 L101 145 236
146 237
238 147
148 239
149 240
G
G
G
G
G
G
G
G
G
G
G
G
E E

G G G G G G
E
E
E
E
E
E

COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACTCOMPACTCOMPACT

COMPACTCOMPACT COMPACT COMPACT
150 241

T T T T T T
10''S 10''S 10''S 10''S 10''S
8''W 8''W 8''W 8''W 8''W
10''W 10''W 10''W 10''W 10''W 10''W
T

COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT L
151 242
152 243
153 244
8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W 8''W

COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACT

COMPACT

COMPACT COMPACT

COMPACT COMPACT COMPACT

COMPACT
L
154 245
155 246
10''W 10''W 10''W 10''W 10''W 10''W 10''W 10''W 10''W

COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACT COMPACTCOMPACTCOMPACT COMPACT COMPACTCOMPACT COMPACTCOMPACT COMPACT

COMPACT

COMPACT COMPACT

COMPACT COMPACT COMPACT

COMPACT
L
156 247
L N'LY PL CL100' (50') (50') S'LY PL (5') (36') (36') (14') 27' 5' 4' TYPICAL SECTIONS NTS SCHAEFER AVE 2% 5' WALK 157 248

TYPICAL SECTIONS NTS OAKS AVE W'LY PL
CL60' (30') (30') E'LY PL (8') (22') (22') 5'
2%5' WALK 20'
158 249
RESOLUTION NO. PC2025-012

A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
CHINO, CALIFORNIA, APPROVING PL24-0097 (SPECIAL
CONDITIONAL USE PERMIT), PL24-0098 (SITE APPROVAL), AND PL24-0120 (SPECIAL CONDITIONAL USE PERMIT) FOR APPROVAL

TO CONSTRUCT THE CHINO GATEWAY TERMINAL PROJECT
CONSISTING OF A 158,548 SQUARE FEET INDUSTRIAL
WAREHOUSE BUILDING, A 3,540 SQUARE FOOT RESTAURANT

BUILDING WITH AN OUTDOOR DINING AREA, AND TO

CONDITIONALLY PERMIT RESTAURANTS, AND A WAREHOUSE
INDUSTRIAL BUILDING GREATER THAN 50,000 SQUARE FEET,
LOCATED ON APPROXIMATELY 7.35 ACRES OF LAND WITHIN THE
LIGHT INDUSTRIAL (M1) ZONING DISTRICT AT THE SOUTHWEST
CORNER OF SCHAEFER AVENUE AND OAKS AVENUE (APN: 1021-
052-04, -06, -09 AND -11).

WHEREAS, Gateway Terminal LLC (the “Applicant”), has filed an application with the City of Chino (the “City”) for approval of PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval), and PL24-0120 (Special Conditional Use Permit) (the “Project”) to construct the Chino Gateway Terminal Project consisting of a 158,548 square foot warehouse industrial building, a 3,540 square foot restaurant building with an outdoor dining area, and to conditionally permit restaurants and a warehouse industrial building greater than 50,000 square feet, located on approximately 7.35 acres of land within the Light Industrial (M1) zoning district at the southwest corner of Schaefer Avenue and Oaks Avenue (APN: 1021-052-04, -06, -09 and -11); and
WHEREAS, in compliance with the California Environmental Quality Act (CEQA), an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project, dated June 2025, has been prepared by LSA Associates, Inc.; and
WHEREAS, the Planning Commission of the City of Chino has completed its study of the proposed Project; and
WHEREAS, on July 16, 2025, the Planning Commission held a duly noticed public hearing for the Project in compliance with law, including compliance with the relevant provisions of the California Government Code and Chino Municipal Code, entertained the written and oral report of staff, and took public testimony on the Project.

NOW, THEREFORE, the Planning Commission of the City of Chino, California, does hereby FIND, DETERMINE, and RESOLVE as follows:

A. The foregoing recitals are true and correct and incorporated herein.

EXHIBIT B
250
RESOLUTION NO. PC2025-012

Page 2 of 7 ends

B. Based on substantial evidence, both written and oral, from the public hearing, the Planning Commission makes the following findings and takes the following actions on PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval), and PL24-0120 (Special Conditional Use Permit):

1. PL24-0098 (Site Approval)
a. The proposed Project is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s). The Project site has a General Plan land use designation of Light Industrial (LI). The LI land use designation is intended for industrial uses with fewer impacts on traffic, noises, odors and pollutants and allows for a broad range of uses. The Project has been designed to meet applicable development standards and design guidelines. The Project serves General Plan Goal LU-2 and Objective LU-2.1 which aim to foster the development of new industrial uses in the City while preventing negative impacts on the health, safety, and welfare of residents and General Plan Objective LU-1.3 which encourages commercial development that will support and enhance vibrant commercial areas and serve existing neighborhoods;
b. The proposed Project is permitted within the zoning district in which it is proposed and complies with all applicable provisions of the City’s Zoning Code. The Project is located in the Light Industrial (M1) zoning district and consists of a 158,548 square foot warehouse industrial building and a 3,540 square foot food and beverage building with an outdoor dining area. The restaurant uses and the size of the warehouse building, which exceeds 50,000 square feet, require approval of a Special Conditional Use Permit.

Additionally, the Project meets or exceeds all minimum development standards related to setbacks, building height, lot coverage, parking, and landscaping;
c. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape, access, type and intensity of development have been met or exceeded. The 7.35-acre site is flat and will have adequate infrastructure and four points of vehicular access from Schaefer Avenue and Oaks Avenue. Utilities and stormwater improvements will be extended to serve the site;
d. The subject site for the Project relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed Project, in that the Project site is located along Schaefer Avenue, which is designated as a primary arterial and Oaks Avenue, which is designated as an urban industrial collector.

Access to the site is provided from the adjacent streets. Additionally, 251
RESOLUTION NO. PC2025-012

Page 3 of 7 ends

Schaefer Avenue is designated as a truck route. Both streets are currently improved and has adequate capacity to serve the proposed Project; e. The proposed Project is compatible with those abutting properties and in the surrounding area. The Project is located within an area designated for industrial uses and is surrounded by existing industrial developments to the east, south and west. To the north, Schaefer Avenue separates the singlefamily residential development from the Project. The Project will have no significant negative light, noise, and aesthetic impacts, as the building has been designed to meet all development and design requirements of the M1 zoning district, in which it is located;
f. The proposed location, size, and operating characteristics of the proposed Project will not be detrimental to the public interest, health, safety or general welfare, as the proposed Project consists of a mixed-use development with an industrial building and a food and beverage building, which is consistent with the M1 zoning district. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”; g. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Addendum satisfies the requirement of CEQA and the CEQA Guidelines (California Public Resources Code §§ 21000 et seq.; 14 Cal. Code Regs. §§ 15000 et seq.); and h. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.

2. PL24-0097 (Special Conditional Use Permit – Warehouse Building ≥ 50,000SF) a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s), in that the proposed use consists of an industrial building exceeding 50,000 square feet, which is permitted subject to approval of a SCUP. The use supports General Plan Goal LU-2 and Objective LU-2.1, which aims to foster the 252
RESOLUTION NO. PC2025-012

Page 4 of 7 ends

development of new industrial uses that contributes to the City’s economic development, while ensuring such uses are planned and designed to prevent negative impacts on the health, safety, and welfare of residents; b. The subject site is physically suitable, including but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of the use have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development. Additionally, the proposed 158,548 square foot industrial building meets all requirements and development standards in the Zoning Ordinance;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as the 158,548 square foot industrial building will have direct access from one driveway off Schaefer Avenue and a second driveway off Oaks Avenue. Schaefer Avenue is designated as a primary arterial and truck route and Oaks Avenue is designated as an urban industrial collector, both streets designed to carry the volume of traffic typically generated by the use;
d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood. The Project is located within an area designated for industrial uses and is surrounded by existing industrial developments to the east, south and west. To the north, Schaefer Avenue, separates the single-family residential development from the use. The use will have no significant negative light, noise, and aesthetic impacts, as the building has been designed to meet all development and design requirements of the M1 zoning district, in which it is located. Additionally, the M1 zoning district is intended for industrial uses that are less intensive;
e. The proposed location, size, and operating characteristics of the proposed use will not be detrimental to the public interest, health, safety or general welfare, as the 158,548 square foot industrial building is allowed in the M1 zoning district, subject to the approval of a SCUP. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”;
f. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The 253
RESOLUTION NO. PC2025-012

Page 5 of 7 ends

Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Addendum satisfies the requirement of CEQA and the CEQA Guidelines (California Public Resources Code §§ 21000 et seq.; 14 Cal. Code Regs. §§ 15000 et seq.); and g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed use, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.

3. PL24-0120 (Special Conditional Use Permit - Restaurant):
a. The proposed use is consistent with the goals and policies of the City’s adopted General Plan and/or applicable specific plan(s); in that the proposed use consists of individual restaurants located within a multi-tenant building. The proposed use is permitted, subject to approval of a SCUP Furthermore, Objective LU-1.3 of the City’s General Plan encourages commercial development that will support and enhance vibrant commercial areas to serve existing neighborhoods with a combination of daily and specialty daily needs;
b. The subject site is physically suitable, including, but not limited to, parcel size, shape, access and availability of utilities, for the type and intensity of use proposed, as all minimum zoning requirements governing parcel size, shape access, type and intensity of development have already been met or exceeded and the appropriate infrastructure and public improvements are conditioned to be constructed with the development;
c. The subject site relates to streets and highways properly designed, both as to width and type of pavement to carry the type and quantity of traffic generated by the proposed use; as the restaurant building will have direct access from one driveway off Schaefer Avenue a second driveway off Oaks Avenue. Schaefer Avenue is designated as a primary arterial and Oaks Avenue is designated as an urban industrial collector, both streets designed to carry the volume of traffic typically generated by the proposed restaurant use;
d. The proposed use is compatible with those on abutting properties and in the surrounding neighborhood, in that restaurants in the M1 zoning district are allowed, subject to approval of a SCUP. The proposed food and beverage building is located within an area designated for industrial uses and is surrounded by existing industrial developments to the east, south and west.

The restaurant component is strategically located at the northeast corner of 254
RESOLUTION NO. PC2025-012

Page 6 of 7 ends

the project site, serving as a transitional buffer between the single-family residential neighborhood, separated by Schaefer Avenue, and the larger warehouse industrial building to the south. The use will have no significant negative light, noise, and aesthetic impacts, as the building has been designed to meet all development and design requirements of the M1 zoning district, in which it is located;
e. The proposed location, size, and operating characteristics of the proposed use will not be detrimental to the public interest, health, safety or general welfare, as restaurant uses are allowed in the M1 zoning district, subject to the approval of a SCUP. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”; f. The proposed Project will not have a significant adverse impact on the environment as an Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Addendum satisfies the requirement of CEQA and the CEQA Guidelines (California Public Resources Code §§ 21000 et seq.; 14 Cal. Code Regs. §§ 15000 et seq.); and g. The minimum safeguards necessary to protect the public health, safety and general welfare have been required of the proposed Project and have been imposed as conditions of Project approval by the Chino Planning Commission. In addition, certain safeguards have been required of the proposed Project, which the Planning Commission deems necessary to protect the public health, safety, and general welfare. These safeguards (Conditions of Approval) are attached hereto as Exhibit “A”.

4. CEQA Findings. An Addendum to the City of Chino General Plan Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project has been prepared by LSA Associates, Inc. for this Project pursuant to Section 15164 of the California Environmental Quality Act (CEQA) Guidelines. The Planning Commission has considered the Addendum and Environmental Impact Report as part of its decision on this Project pursuant to Section 15164. The Planning Commission hereby finds that the Project is within the scope of the EIR, which adequately describes the activity for the purposes of CEQA. The Planning Commission hereby finds that the Project will not have any impacts that would require a revision to the EIR or any other additional environmental review.

5. Approval of PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval) and PL24-0120 (Special Conditional Use Permit). The Planning 255
256

EXHIBIT A

DEPARTMENTAL

CONDITIONS OF APPROVAL
DATE: July 16, 2025
PROJECT FILE NO.: PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval), and PL24-0120 (Special Conditional Use Permit) LOCATION: Southwest corner of Schaefer Avenue and Oaks Avenue (APN: 1021-052-04, -06, -09 and -11)
APPLICANT: Gateway Terminal LLC
The departments listed below have reviewed the above referenced application. Those departments marked with an “X” have required conditions of approval to be imposed on the project.

Development Services Department –
[X] Planning Division
[ ] ADA Accessibility Division
Public Works Department –
[X] Engineering Division
[ ] Traffic Division
[X] Chino Valley Independent Fire District
[ ] Police Department
[ ] Finance Department
[ ] Community Services, Parks & Recreation Department
257

DEVELOPMENT SERVICES DEPARTMENT

PLANNING DIVISION CONDITIONS OF APPROVAL
DATE: July 16, 2025
PROJECT FILE NO.: PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval) and PL24-0120 (Special Conditional Use Permit) LOCATION: Southwest corner of Schaefer Avenue and Oaks Avenue (APN: 1021-052-04, -06, -09 and -11)
APPLICANT: Gateway Terminal LLC
NOTE: CONDITION IN BOLD WAS ADDED BY THE PLANNING COMMISSION.

1.0 TIME LIMITS:

1.1. The above referenced Site Approval and Special Conditional Use Permits shall expire on July 16, 2026, if building permits are not obtained and/or the approved uses have not commenced. The expiration date may be extended upon written request by the applicant on a City application form.

The request must be received by the Director of Development Services at least 30 days prior to expiration of the application.

1.2. Should any of the special conditionally permitted uses cease to exist for 180 or more consecutive days, then the permit shall be deemed null and void.

2.0 GENERAL REQUIREMENTS:

2.1. Failure to comply with any conditions of approval shall be deemed just cause for revocation of project approval by the Planning Commission and/or City Council.

2.2. The project shall proceed only in accordance with the approved plans on file with the Development Services Department, and with the conditions contained herein and the Chino Municipal Code.

2.3. The Director of Development Services shall have the authority to approve minor deviations in the site plan, architecture and/or landscape providing the total approved building area is not exceeded. If it is determined that 258

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 the changes will be substantial, approval from the Planning Commission will be required.

2.4. Approval of this request shall not waive compliance with any section of the Chino Municipal Code, or any other applicable City ordinances, or applicable specific plan provision.

2.5. Pursuant to Government Code Section 66020, upon approval of the project, the applicant has a 90-day period in which to protest the fees, dedications, reservation or other exaction imposed on this project through the conditions of approval.

2.6. In the event that any condition contained herein is determined to be invalid or legally unenforceable, all remaining conditions shall remain in force.

2.7. In the event that any condition imposing a fee, exaction, dedication, or other mitigation measure is challenged by the applicant and/or other parties in an action filed in a court of law, which action is brought within the time period provided for by law, this approval shall be suspended pending dismissal of such action, the expiration of the limitation period applicable to such action, or final resolution of such action. If any condition is invalidated by a court of law, the applicable section of the entire project shall be reviewed by the City and substitute conditions may be imposed.

2.8. The applicant shall indemnify the City and its elected boards, commissions, officers, agents and employees and will hold and save them and each of them harmless from any and all actions, claims, liabilities, losses, damages, penalties, obligations and expenses, including but not limited to attorneys’ fees and costs, (collectively “claims”) against the City for any such claims and shall be responsible for any judgment arising therefrom. The City shall provide the applicant with notice of the pendency of such action and shall request that the applicant defend such action. The applicant may utilize the City Attorney’s office or use legal counsel of its choosing, but shall reimburse the City for any necessary legal cost incurred by City, including for the City’s required participation in defense of the claims. The applicant shall provide a deposit in the amount of 100% of the City’s estimate, in its sole and absolute discretion, of the cost of litigation, including the cost of any award of attorney’s fees, and shall make additional deposits as requested by City to keep the deposit at such level. If the applicant fails to provide or maintain the deposit, the City may abandon the action and the applicant shall pay all costs resulting therefrom and City shall have no liability to the applicant.

2.9. The City of Chino has an executive contract with Waste Management for all solid waste collection and hauling services within the City. The 259

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 applicant shall be responsible for making arrangements with Waste Management for disposal of any/all construction debris or trash generated as a result of this permit. Waste Management can be reached at 1-800 423-9986.

2.10. Any change in the project shall be reviewed by the Development Services Department for compliance with CEQA.

2.11. All proposed signs shall be designed to conform with the City’s Sign Code (Chino Municipal Code, Title 16 – Signs) and shall require separate application and approval by the Director of Development Services prior to installation.

2.12. Pursuant to Public Resources Code Section 21089 and Fish and Wildlife Code Section 711.4, the developer shall provide those fees marked [X] below in the form of a check made payable to the San Bernardino County Clerk of the Board of Supervisors within 5 days of Planning Commission approval. Project approval shall not be complete until the required fee(s) is (are) paid:
[X] $50 for the Notice of Determination filing fee.

3.0 PRIOR TO THE ISSUANCE OF A BUILDING AND/OR GRADING PERMIT:

3.1. The applicant/developer shall pay development impact fees at the established rate. Such fees may include, but not be limited to, new construction fee, park or open space fees, school fees, drainage fees, sewer fees, building permit and plan check fees.

3.2. Revised plans, incorporating all conditions of approval, shall be submitted and approved by the Director of Development Services.

3.3. All plans shall be coordinated for consistency.

3.4. The applicant/developer shall submit two sets of structural plans/construction documents. The plans shall include one set of structural calculations, one set of Title 24 energy calculations, and one soils report. The applicant/developer shall also submit the above documents in digital format to the Building Division once approved.

3.5. A construction management plan shall be submitted and approved by the Director of Development Services. The plan shall coordinate and address construction activities that may impact residents and/or surrounding businesses in adjacent areas. Elements of the plan shall contain, but not be limited to, the following:
260

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 a. Routing of construction equipment
b. Hours of operation
c. Dust control
d. Vector control
e. Vehicle, equipment, and personnel staging
f. Pre-construction meetings
g. Contractor/subcontractor acknowledgement, obligations, and penalties h. Traffic control and coordination
i. Security and interim fencing
j. Signs posted on the site with a contact number for the job site construction manager and the City’s Code Enforcement Division. Signs shall measure at least four feet by eight feet and shall be posted along every street frontage. The developer shall contact the City immediately upon any change in contact numbers.
k. Building and landscape phasing. This plan shall show which buildings and landscaping will be completed in which phases, and how each completed phase will be closed off from phases under construction so as to minimize conflict between construction vehicles, construction equipment, employees, and residents, as applicable.

3.6. A precise wall plan identifying the design, location and construction details of all walls and fences shall be submitted and approved by the Planning and Building Divisions. All perimeter and street-facing walls, including retaining walls, shall be decorative in nature.

3.7. Prior to the issuance of any grading permit, detailed on-site landscaping and irrigation construction drawings along with a copy of the Planning Commission approved conceptual landscape plans and a copy of the conditions of approval shall be submitted for review and approval by the Director of Development Services. A grading permit will not be issued until the City’s outside plan checker has completed one review of detailed landscape and irrigation plans for the development. Payment of the Landscape & Irrigation Plan Review Fee shall be due at the time of submittal. Plans shall be prepared to comply with the City’s Water Efficient Landscape Ordinance, adopted on October 6, 2015, Ordinance No. 2015-008, meet the requirements for a Landscape Documentation Package in accordance with Section 20.19.030 of the Landscape Ordinance, and shall bear the seal of a landscape architect registered with the state of California. If the site includes areas proposed to be placed within a City-maintained Landscape Maintenance District, then the plans shall be prepared on City of Chino, Engineering Division base sheets, and shall bear the seal of a landscape architect registered with the state of California. Original mylars shall be submitted to the City upon approval of plans by the City Engineer.
261

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

3.7.1. To minimize damage to paved areas due to tree root growth, trees located within five (5) feet of any paved surface area, shall be provided with root barriers unless it can be demonstrated, to the satisfaction of the Planning Division, that the root growth characteristics of the type of tree proposed does not warrant their installation.

3.8. Approval of the conceptual landscape plan by the Planning Commission does not constitute final approval. The final landscape approval (during the plan check process and/or following installation) shall be subject to the review and approval of the City’s Landscape Architect Consultant and the Director of Development Services. The City Landscape Architect or Director of Development Services may require additional/fewer trees, shrubs, vines, and ground cover as necessary, based on final site conditions during the landscape plan check process or field review process in order to mitigate any site conditions that were not apparent during either the Planning Commission review or plan check review process.

3.9. All new ground-mounted utilities, including but not limited to cable television facilities, and telephone/fiber optic facilities, shall be undergrounded. Equipment that is not placed underground such as SCE transformers, backflow prevention devices, irrigation valves and controllers used for common landscape areas shall be placed in areas out of public view and sufficiently screened. The location and method of screening shall be reflected in a plan and shall be subject to the review and approval by the Director of Development Services.

3.10. All electrical panels and cabinets shall be completely screened. All electrical panels and cabinets shall be fully enclosed and integrated into and architecturally compatible with the building to the satisfaction of the Director of Development Services. The locations of the electrical panels and cabinets shall be reflected on a site plan and elevation(s) to be reviewed and approved by the Director of Development Services.

3.11. Prior to the issuance of a building permit, the approved grading plans shall be attached to the construction plan set. The project shall be built according to the plans approved by the Planning Commission on July 16, 2025, as prepared by Gateway Terminal LLC, O.C. Design & Engineering, Phil May Landscape Architecture and Pacific Consulting Group, Inc. Any substantial modification to the project shall require Planning Commission review and approval. If minor in nature, the modification may be reviewed and approved by the Development Services Director.
262

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

3.12. A detailed on-site exterior lighting plan shall be submitted and approved by the Director of Development Services. Plans shall be designed pursuant to Chino Municipal Code Section 20.10.090 (Outdoor Lighting) and shall identify fixture design, illumination (photometric), location, height and method of shielding, so as not to adversely affect adjacent properties.

3.13. Upon submittal of construction drawings to the Building Division for plan check review, all departmental conditions of approval for the project shall be included on the sheet following the title sheet, or the first sheet of the plans. A site plan shall also be attached to all sets of construction drawings. The condition shall be a minimum requirement for acceptance of construction drawings for the Building plan check review.

3.14. The applicant is required to contact the West Valley Mosquito and Vector Control District to determine if an inspection or field survey of potential vectors and their ectoparasites is necessary. If the District so determines, an inspection or field survey shall be conducted by the District, at the applicant’s expense, prior to demolition or grading in order to protect the health of and reduce the risk of neighboring residents to vector-borne diseases. Based on the inspection or survey results, the applicant shall take appropriate vector control methods as recommended by the District.

3.15. A Water Quality Management Plan shall be prepared in accordance with County of San Bernardino requirements and submitted and approved by the City.

3.16. No grading permits shall be issued until all applicable biological resource mitigation measures, identified in the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project, prepared by LSA Associates, Inc., dated June 2025, as they apply to the project area, have been complied with to the satisfaction of the Director of Development Services.

3.17. Special Condition:

3.17.1. The applicant shall reinforce the outdoor seating area to protect patrons and minimize damage in the event of a
vehicular collision, subject to review and approval of the Director of Development Services.

4.0 PRIOR TO START OF CONSTRUCTION:

4.1. A pre-construction meeting, scheduled with the Building Division, shall be held with all applicable City staff members, developer, contractor, superintendent, and all applicable subcontractors.
263

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

4.2. The final landscape and irrigation plans for the development shall be approved by the Director of Development Services.

4.3. The approved construction management plan shall be distributed to all contractors and subcontractors and shall be maintained on-site through the duration of construction.

5.0 PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY:

5.1. All conditions of approval shall be completed to the satisfaction of the Director of Development Services.

5.2. The fee for review of the landscaping and irrigation plans by both the City and the City’s landscape architect shall be paid by the developer.

5.3. All landscaping and irrigation shall be installed in accordance with the approved Planning Commission plans on file with the Development Services Department, and irrigation systems fully operational. In addition, all hardscaped and landscaped areas shall be free of trash and debris.

5.4. A licensed landscape architect or contractor, or other licensed certified professional in a related field shall conduct a final field inspection and shall prepare a certificate of completion, which shall be filed with the Director of Development Services. The certificate of completion shall be prepared in accordance with Section 20.19.030.J of the Landscape Ordinance, and shall specifically indicate that plants were installed as specified by the landscape design plan, that the irrigation system was installed as specified by the irrigation design plan, and that an irrigation audit has been performed. All landscape and irrigation audits shall be conducted by a landscape irrigation auditor. Landscape audits shall not be conducted by the person who designed the landscape or installed the landscape.

5.5. A landscape maintenance program for the entire project site shall be reviewed and approved by the Director of Development Services. The maintenance program shall include general landscape maintenance provisions for pruning, trimming, the replacement of any dead, decayed, or diseased vegetation, ongoing weed abatement, and replacement/repair of the irrigation system, when necessary. The landscape maintenance program shall be included with the contract with the landscape maintenance company to ensure they implement the maintenance program. In addition, the maintenance program should include provisions for periodic inspections to ensure the irrigation system is working properly, and all landscaping is being properly maintained.
264

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

5.6. Prior to issuance of a certificate of occupancy for the final unit, any temporary sales and/or construction office buildings/trailers shall be removed from the site.

5.7. The project site shall be clean and free of trash and construction debris, and all construction equipment shall be removed from the site.

6.0 ENVIRONMENTAL REQUIREMENTS & MITIGATION MEASURES:

6.1. Comply with all mitigation measures identified in the attached Mitigation Monitoring and Reporting Program contained within the Addendum to the City of Chino General Plan Certified Environmental Impact Report (SCH# 2008091064) for the Chino Gateway Terminal Project and attached as Exhibit “A” to the conditions of approval, which identifies each environmental mitigation measure, the time in which it will be implemented and the responsible party for monitoring its implementation.

7.0 OTHER REQUIREMENTS:

7.1. The applicant shall disclose to all potential tenants or owners of units or buildings that the businesses/uses must be consistent with the standards of the land use designation/zoning district in which the project site is located.

7.2. All existing buildings or structures on the project site that are proposed to be demolished shall be removed or razed within 90 days of the existing church vacating the site or issuance of a grading permit, whichever occurs first. The Director of Development Services may approve an extension of time to complete the demolition, based on evidence that the applicant has exercised reasonable progress. Approval of this application shall be deemed null and void upon failure of the applicant to comply with this condition within the aforementioned time periods.

7.3. The project site shall be cleared of all trash, debris, weeds, and other discarded items within two weeks of Planning Commission approval.

Approval of this application shall be deemed null and void upon failure of the applicant to comply with this condition within the aforementioned time period.

7.4. A coating that will facilitate the removal of graffiti shall be applied over the complete height of one side/both sides of walls and/or fences, and to a height of eight feet on building walls. If a coating is not provided, the owner of the property shall paint the buildings and/or walls to remove graffiti within 72 hours of notice.
265

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

7.5. All signs, including subdivision and/or realty signs proposed for this development shall be designed to conform to the Sign Ordinance and shall require separate application and approval by the Planning and Building Divisions prior to installation.

7.6. Building and Site Design:

7.6.1. Exterior building color shall be reviewed and approved by the Director of Development Services. Colors shall be coordinated between structures, utilizing compatible hues and intensities.

Final review and approval of paint colors utilizing a color test may be required prior to painting any structure, if determined necessary in the field by the Director of Development Services.

7.6.2. All building drainage gutters, downspouts, vents, etc., located on the exterior walls shall be architecturally compatible with the exterior building design and color, to the satisfaction of the Director of Development Services, or shall be completely concealed from view. They shall not be located on the exterior of building walls near office areas or other prominent locations on the building(s).

7.6.3. All new mechanical equipment and appurtenances of any type (including, but not limited to, electrical cabinets, HVAC equipment, skylights, stack vents or fans) whether located on rooftops, ground level or anywhere on the building structure, shall be completely screened so as not to be visible from any public street and/or adjacent property, subject to review and approval by the Director of Development Services. The parapet wall should serve as the primary method of screening, or the facilities shall be enclosed within the structure of the building. Such enclosure of facilities shall be of compatible design related to building structure for which such facilities are intended to serve.

7.6.4. Returns for parapet walls shall not be visible from public view and shall be evaluated in the field during construction, and modified if necessary so as not to be visible. All parapet returns shall be a minimum of 4 feet deep.

7.6.5. New ladders for roof access shall be mounted on the inside of the building or shall be completely concealed from view for commercial and industrial projects.

7.6.6. All new overhead doors, mechanical doors and/or man doors shall be color coordinated with the building.
266

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

7.6.7. An outdoor employee break area shall be provided at the northwest corner of the project site, in front of the industrial warehouse building. This area shall be provided with seating, tables, enhanced paving treatments, hose bibs, decorative trash receptacles, a shade trellis structure, and shade trees, to the satisfaction of the Director of Development Services.

7.6.8. All landscaping shall be designed and installed in accordance with Section 20.19 of the Chino Municipal Code.

7.7. Parking and Lighting:

7.7.1. All exterior lighting fixtures shall be installed in accordance with plans on file with the Development Services Department and shall be fully operational prior to occupancy.

7.7.2. All building-mounted light fixtures within public areas shall be decorative in nature and architecturally compatible with the building. Building-mounted light fixtures shall be reviewed and approved by the Director of Development Services prior to installation. “Wall-paks” or other standardized exterior lighting shall not be permitted within public areas.

7.7.3. All parking and loading areas shall be paved and double-striped in accordance with plans on file with the Development Services Department, Chino Municipal Code Chapter 20.18 (Parking) and the disabled parking and accessibility requirements of state law (see the CalDAG—California Disabled Accessibility Guidebook).

7.7.4. Drive surfaces contiguous with planter areas shall have a 6-inch raised curb separation.

7.7.5. All parking spaces, aisles, entrances and exits shall be doublestriped per City standards.

7.7.6. All parking spaces for compact cars shall be clearly identified as "Compact Car Only" on the pavement, at the opening of the space. Compact parking spaces shall be reasonably distributed throughout the parking area, subject to review and approval by the Director of Development Services.

7.8. Refuse and Recycling:

7.8.1. Separate receptacles (bins) for the collection of refuse, recyclable, and organics materials shall be provided. An adequate 267

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 number of bins to allow for the collection of refuse recyclable, and organic materials generated by the development shall be provided.

7.8.2. Refuse, recyclable, and organics materials bins shall be enclosed by a 6-foot-high (1.83 m) wall with a solid roof that is designed to be architecturally compatible with the building(s), with solid view obstructing gates fitted with self-closing door devices and be designed with cane bolts in front of the block walls to secure the gates when in the open position. The gates should also be equipped with rod locks and corresponding rod holes in both the open and closed gate positions. Bins containing recyclable materials shall be provided protection from adverse environmental conditions that might render the collection materials
unmarketable.

7.8.3. No refuse/recycling/organic enclosure shall be located within any required setback area.

7.8.4. All refuse, recyclable and organic material bin enclosures not located in private yard areas shall be screened with landscaping on all sides, with the exception of the gate area. All sides of the enclosure, with the exception of the gate area, shall be surrounded by a minimum 18” wide planter area for the purpose of providing landscape material.

7.8.5. Refuse storage, recycling and organic areas shall not be used for the storage of materials other than that for which it is designed (refuse, recyclable and organic materials). The premises shall be kept in a neat and orderly condition, and in good repair and appearance at all times.

7.9. Phased Projects:

7.9.1. All required street improvements and a minimum of 10 feet of landscaping on private property shall be installed in conjunction with the construction of Phase 1 of the proposed project. The landscaping within this area shall be included in the landscape maintenance program.

7.9.2. Prior to the first occupancy permit, all undeveloped building pads shall be improved according to the following requirements:

7.9.3. For an undeveloped building pad located adjacent to the street or main drive aisle of the site, the area shall be landscaped with a 268

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 planting scheme consisting of a low-maintenance drought tolerant erosion control mix of Cucamonga brome (20 lbs/acre), tomcat clover (4 lbs/acre and small fescue (8 lbs/acre) at a minimum of 85% PLS (pure live seed). The irrigation system shall consist of low precipitation sprinkler heads and/or drip system. In addition, shrubs may be required to provide screening from the street, if determined needed by the Director of Development Services.

Said treatment shall be incorporated into the required landscape and irrigation plans.

7.9.4. For a larger phased area located on the interior of the site, a construction fence/green screen may be provided in lieu of the landscape treatment. The fence shall be maintained in good condition at all times.

7.10. Chino Climate Action Plan:

7.10.1. Per Section 15.45.070 of the Chino Municipal Code, demonstrate consistency with the Chino Climate Action Plan by implementing one of the following three options:
a) Exceed the mandatory California Energy Code Title 24, Part 6 standards in effect at the time of application submittal by 5%; or b) Achieve an equivalent reduction through voluntary measures in the California Green Building Standards Code, Title 24, Part 11 (CALGreen) in effect at the time of application submittal; or c) Provide other equivalent greenhouse gas (GHG) reductions through measures including but not limited to, non-vehicle transportation infrastructure, transit, ZEV (zero emission vehicle) infrastructure or other incentives, waste diversion, water conservation, tree planting, renewable energy option packages, or any combination of these or other measures such that GHG emissions are reduced by 0.74 MT CO2e per residential dwelling unit per year and/or per TSF of commercial/industrial use per year.

Applicants that choose Option a described above will be required to verify that their project meets the 5% improvement above the mandatory standards through the appropriate certificate of compliance form for residential construction (CF-1R) or for commercial/industrial construction (PERF-1C). Applicants that choose Options b or c described above will be required to utilize the GHG Performance Standard Checklist developed by the City, or provide other valid documentation, such as CalEEMod or other methodologies, as verified by the Director of Development 269

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 Services to demonstrate the required GHG reductions consistent with the City's CAP.

8.0 CONSTRUCTION SITE SECURITY:

8.1. Each site shall be completely encircled by a minimum 6' tall securityquality chain link fence once precise grading has been completed or as determined by the Deputy Director of Development Services.

8.2. Tennis court or similar screening material shall be securely attached for the length of the fence, excluding gates and 10' on either side of gates.

8.3. Each site shall have only one entry/exit gate, or as approved by the Planning Division.

8.4. Gate hinge pins shall be spot-welded or altered in such a way as to prevent easy removal.

8.5. Each gate shall have a casehardened lock and chain, or other equivalent security hardware.

8.6. “No Trespassing” signs shall be attached to the exterior of the fence at a minimum distance of a third of a mile and at all entrances.

8.7. On or near the exterior of each gate will be a sign with the address of the site in no less than 6" letters. Both the number and street name will be listed on the sign. The address posted will be used for the entire site until the fence is removed and individual addresses assigned.

8.8. Office trailers and tool bins shall be placed adjacent to gates inside the property to allow observation from outside.

8.9. Lighting on trailers and bins is desirable but shall be directed into the property so as not to impede outside observation or endanger nearby traffic with glare.

8.10. Tool bins shall be secured with casehardened locks, preferably with lock guards.

8.11. A sign stating that theft is not acceptable on the site and will be reported to the police, or wording to that effect, will be displayed prominently near each entrance.

8.12. Each site will have an assigned Crime Prevention Manager who is responsible for the following:
270

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025 a. Providing his/her name and 24-hour telephone access number to the Chino Police Department.
b. Have available at all times the names and 24-hour contact numbers for all subcontractors.
c. Have the authority to speak for the development/owners on matters concerning trespassing and other criminal matters.
d. Complete routine fence inspections and arrange for prompt repairs or removal of any damage, graffiti, or loose screening. e. Ensure that no work or maintenance of construction equipment is being performed on the site between 8 PM and 7 AM.
f. Ensure that all above security requirements are complied with, and that all security hardware, fencing, and lighting are maintained in working order.
g. Ensure that thefts are immediately reported to the police department and that reasonable steps are taken, if evident, to prevent future similar incidents.

9.0 THE APPROVED USES SHALL BE OPERATED IN ACCORDANCE WITH THE FOLLOWING:

9.1. All operations shall not create a nuisance due to noise, odor, dust, mud, smoke, steam, vibration or other similar causes.

9.2. The operation or activity shall not cause the emission of any smoke, fly ash, dust, fumes, vapors, gases, or other forms of air pollution that can cause damage to human health, vegetation, or other forms of air pollution that can cause excessive soiling on any other parcel. No emission shall be permitted which exceeds the requirements of the South Coast Air Quality Management District or the requirements of any Air Quality Plan adopted by the City of Chino.

9.3. The operation or activity shall not emit odorous gases or other odorous matter in such quantities as to be dangerous, injurious, noxious, or otherwise objectionable to a level that is detectable with or without the aid of instruments at or beyond the project site boundary.

9.4. The operation shall not discharge, at any point, into any public or private street, public sewer, storm drain, private stream, body of water, or into the ground, any material which can contaminate any water supply, interfere with bacteriological processes in sewerage treatment, or otherwise cause the emission of dangerous or offensive elements, except in accordance with the standards approved by the California Department of Public Health, or any other federal, state or local government agency. 271

DEVELOPMENT SERVICES DEPARTMENT PLANNING DIVISION

CONDITIONS OF APPROVAL
FILE NO.: PL24-0097 (SCUP), -0098 (SA) & -0120 (SCUP) DATE: July 16, 2025

9.5. No operation or activity shall emit heat or cold that would cause a temperature increase or decrease on any adjacent parcel in excess of 100F (5.560C).

9.6. No operation or activity shall cause any impermissible source of electronic disturbance that adversely affects persons or the operation of any equipment on any other parcel that is not in conformance with the regulations of the Federal Communications Commission (FCC).

Impermissible interference for the purposes of this document shall mean any interference that violates the rules and regulations of the FCC and/or the Communications Act of 1934, as amended.

9.7. No operation or activity shall be permitted to cause a steady state, earthborne oscillation which is continuous and occurring more frequently than 100 times per minute beyond the project site. Ground vibration caused by moving vehicles, trains, aircraft, or temporary construction or demolition is exempted from this requirement.

9.8. Noise emanating from the project site, and which is received by adjacent land uses, shall not exceed the levels specified below, except that loudspeakers, bells, gongs, buzzers or other noise attention or attracting devices shall not exceed a maximum daytime dBA level of 60 and nighttime dBA of 40, measured anywhere beyond the boundaries of the property within which the noise is created.

Attachment:

Exhibit “A” – Mitigation Monitoring and Reporting Program Maximum Time of
Exposure
Noise
Metric
Noise Level Not To Be Exceeded
7 a.m. to 10 p.m. 10 p.m. to 7 a.m.
30 Minutes/Hour L50 55 dBA 50 dBA
15 Minutes/Hour L25 60 dBA 55 dBA
5 Minutes/Hour L8.3 65 dBA 60 dBA
One Minute/Hour L1.7 70 dBA 65 dBA
Any Period of Time Lmax 75 Dba 70 dBA
272

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 1
This Mitigation Monitoring and Reporting Program has been prepared for use in implementing mitigation for the:

Chino Gateway Terminal Project
Special Conditional Use Permits (PL24-0097 and PL24-0120), Site Approval (PL24-0098) The program has been prepared in compliance with State law and Addendum to The City of Chino General Plan Environmental Impact Report (State Clearinghouse No. 2008091064) prepared for the project by the City of Chino (City).

The California Environmental Quality Act (CEQA) requires adoption of a reporting or monitoring program for those measures placed on a project to mitigate or avoid significant effects on the environment (Public Resource Code Section 21081.6). The law states the reporting or monitoring program shall be designed to ensure compliance during project implementation.

The monitoring program contains the following elements:
1) The mitigation measures are recorded with the action and procedure necessary to ensure compliance. In some instances, one action may be used to verify implementation of several mitigation measures.
2) A procedure for compliance and verification has been outlined for each action necessary. This procedure designates who will take action, what action will be taken and when, and to whom and when compliance will be reported.
3) The program has been designed to be flexible. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. As changes are made, new monitoring compliance procedures and records will be developed and incorporated into the program.

This Mitigation Monitoring and Reporting Program includes mitigation identified in The City of Chino General Plan Environmental Impact Report (State Clearinghouse No. 2008091064).

MITIGATION MONITORING AND RESPONSIBILITIES
As the Lead Agency, the City is responsible for ensuring full compliance with the mitigation measures adopted for the proposed project. The City shall monitor and report on all mitigation activities.

Mitigation measures shall be implemented at different stages of development throughout the project site. In this regard, the responsibilities for implementation have been assigned to the Applicant, City, Contractor, or a combination thereof. If, during the course of project implementation, any of the mitigation measures identified herein cannot be successfully implemented, the City shall be immediately informed, and the City shall then inform any affected responsible agencies. The City, in conjunction with any affected responsible agencies, shall then determine if modification to the project is required and/or whether alternative mitigation is appropriate.

REGULATORY COMPLIANCE MEASURES
Regulatory Compliance Measures are presented in instances where the proposed project would not create a significant impact but would be required to adhere to regulatory requirements in order to ensure impacts do not become significant. Regulatory Compliance Measures outline compliance with various federal, State, and/or local acts, laws, rules, regulations, municipal codes, policies, etc. 273

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 2

THIS PAGE INTENTIONALLY LEFT BLANK
274

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 3

MITIGATION MONITORING AND REPORTING PROGRAM CHECKLIST
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 13, 2025
Mitigation Measure No. / Implementing Action
Responsible
for
Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
V.1. AESTHETICS
Since there are no significant impacts related to aesthetics as a result of the project, no mitigation measures are required.

V.2. AGRICULTURAL RESOURCES
Since there are no significant impacts related to agricultural resources as a result of the project, no mitigation measures are required.

V.3. AIR QUALITY AND GREENHOUS EGAS EMISSIONS
Since there are no significant impacts related to air quality and greenhouse gas emissions as a result of the project, no mitigation measures are required.

V.4. BIOLOGICAL RESOURCES
Since there are no significant impacts related to biological resources as a result of the project, no mitigation measures are required.

V.5. CULTURAL RESOURCES
Since there are no significant impacts related to cultural resources as a result of the project, no mitigation measures are required.

V.6. GEOLOGY/SOILS and MINERAL RESOURCES
Since there are no significant impacts related to geology/soils and mineral resources as a result of the project, no mitigation measures are required.

V.7. HAZARDS & HAZARDOUS MATERIALS
Since there are no significant impacts related to hazards and hazardous materials as a result of the project, no mitigation measures are required.

V.8. HYDROLOGY/WATER QUALITY
Since there are no significant impacts related to hydrology/water quality as a result of the project, no mitigation measures are required.

V.9. LAND USE and PLANNING
Since there are no significant impacts related to land use and planning as a result of the project, no mitigation measures are required. 275

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 4
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 13, 2025
Mitigation Measure No. / Implementing Action
Responsible
for
Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
V.10. NOISE
Since there are no significant impacts related to noise as a result of the project, no mitigation measures are required.

V.11. POPULATION/HOUSING
Since there are no significant impacts related to population/housing as a result of the project, no mitigation measures are required.

V.12. PARKS and PUBLIC SERVICES
Since there are no significant impacts related to parks and public services as a result of the project, no mitigation measures are required.

V.13. TRANSPORTATION/TRAFFIC
Since there are no significant impacts related to transportation/traffic as a result of the project, no mitigation measures are required.

V.14. UTILITY SYSTEMS and INFRASTRUCTURE
Since there are no significant impacts related to utility systems and infrastructure as a result of the project, no mitigation measures are required.

V.15. ENERGY
Since there are no significant impacts related to energy as a result of the project, no mitigation measures are required.

V.16. VEHICLE MILES TRAVELED
Since there are no significant impacts related to vehicle miles traveled as a result of the project, no mitigation measures are required.

V.17. TRIBAL CULTURAL RESOURCES
Since there are no significant impacts related to tribal cultural resources as a result of the project, no mitigation measures are required.

V.18. WILDFIRE
Since there are no significant impacts related to wildfire as a result of the project, no mitigation measures are required. 276

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 5

REGULATORY COMPLIANCE MEASURES
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 16, 2025
Regulatory Compliance Measure / Implementing
Action
Responsible
for Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
V.4. BIOLOGICAL RESOURCES
REGUATORY COMPLIANCE MEASURE BIO-1: A
preconstruction survey for burrowing will be conducted
within 30 days prior to initial ground disturbance. If
burrowing owl is found on the site, the developer will
consult with California Department of Fish and Wildlife (CDFW) and relocate the owls in accordance with CDFW
burrowing owl relocation protocols, including the
creation of artificial burrows.

City of Chino
Director of
Development
Services, or
designee.

Within 30 days prior to initial
ground disturbance and during
construction.

Evidence to the City a
qualified biologist is
retained, the required
pre-construction survey
has been completed, and,
if necessary, appropriate
consultation with the
CDFW and relocation of
owls in accordance with
CDFW burrowing owl
relocation protocols,
including the creation of
artificial burrows, has
occurred.

Withhold
grading permit
and/or issuance
of a stop work
order.

REGUATORY COMPLIANCE MEASURE BIO-2: If tree
removal is to be conducted during the nesting season
(February through August), a preconstruction nesting
bird survey shall be conducted by a qualified avian
biologist to ensure that active bird nests would not be disturbed or destroyed. The survey shall be completed no more than three days prior to initial clearing of
vegetation. The nesting bird survey shall include the
project site and adjacent areas where project activities have the potential to affect active nests, either directly or indirectly, due to construction activity, noise, human
activity, or ground disturbance.

If an active nest is identified, a qualified avian biologist shall establish an appropriately sized non-disturbance
City of Chino
Director of
Development
Services, or
designee.

No more than three days prior
to initial clearing of vegetation
if tree removal is to be
conducted during the nesting
season (February through
August).

Evidence to the City a
qualified avian biologist is
retained, the required
pre-construction survey
has been completed, and,
if necessary, appropriate
buffers have been
implemented and
enforced until the nest is
deemed inactive by the
qualified avian biologist.

Withhold
grading permit
and/or issuance
of a stop work
order.
277

MITIGATION MONITORING AND REPORTING PROGRAM

CHINO GATEWAY TERMINAL PROJECT
Mitigation Monitoring and Reporting Program 6
Project Name: Chino Gateway Terminal Project Applicant: Gateway Terminal, LLC.

Date: June 16, 2025
Regulatory Compliance Measure / Implementing
Action
Responsible
for Monitoring Timing of Verification Method of Verification Verified
Date/
Initials
Sanctions for
NonCompliance
buffer between 100 and 300 feet (500 feet for raptors)
around the nest, depending on bird species, behavior,
and level of construction activity, using flagging or
staking. Construction activities shall not occur within any non-disturbance buffer zones until the nest is deemed
inactive by the qualified avian biologist.
278

PUBLIC WORKS CONDITIONS OF APPROVAL
Reviewed/Approved By: JP Date: 7/1/2025
Template Rev. 2/11/2025
PROJECT NO. PL24-0097 (SCUP)/-0098 (SA)/-0120(SCUP)
DATE: July 1, 2025 PC MEETING DATE: July 16, 2025
PROJECT DESCRIPTION: Proposal for a new mixed use development of two buildings: a building with 158,548 sq ft of industrial warehouse uses and 3,520 sq ft of food and beverage use building. Existing structures, totaling 17,716 SF, are to be demolished. Four (4) lots will be merged into two (2) lots.

PROJECT LOCATION: 5849 Schaefer Avenue
APPLICANT: Gateway Terminal LLC PROJECT ENGINEER: Daniel Aguirre

PRIOR TO THE THREE MAJOR DEVELOPMENT EVENTS, THE APPLICANT SHALL SATISFY AND FULFILL ALL CONDITIONS OUTLINED BELOW. FAILURE TO COMPLY WITH ANY CONDITIONS OF

APPROVAL SHALL BE DEEMED JUST CAUSE FOR REVOCATION OF PROJECT APPROVAL BY THE PLANNING COMMISSION. HOWEVER, THE PUBLIC WORKS DIRECTOR SHALL HAVE THE

AUTHORITY TO APPROVE MINOR DEVIATIONS IN THE CONDITIONS OF APPROVAL, AND ALL PLANS INCLUDING THE CONSTRUCTION DRAWINGS.

1.0 PRIOR TO ISSUANCE OF BUILDING OR CONSTRUCTION PERMITS:

1.1. All required plans and studies shall be prepared by a Registered Professional Engineer and submitted to the Project Engineer for review and approval. All project plans must be approved by the City Engineer's office before a Building Permit will be issued. All maps, studies, calculation sheets, reports, etc. must be on and/or folded in an 11-inch by 8½-inch standard format.

1.2. Make the following dedications:

Street Name Distance Direction From C/L
Oaks Ave 33-ft total from CL to ROW West
(3-ft dedication)

1.2a Dedicate to the City of Chino, a corner cutoff dedication at the southwest corner of Schaefer Ave. and Oaks Ave., per the City’s Municipal Code.

1.2b Prepare and record necessary drainage easements to implement the project in accordance with drainage law.

1.3. Apply for and record a Lot Merger (LM) prior to the issuance of building permits. Record a Conforming Deed with the County of San Bernardino within six months of the recordation of the LM to conform the new legal description. Submit a copy of the recorded Conforming Deed to the Public Works Department.

1.4. Prepare and submit a drainage study, including supporting hydraulic and hydrological data to the project engineer for approval. The study shall confirm or recommend changes to the City’s adopted Master Drainage Plan by identifying off-site and on-site storm water runoff impact resulting from build-out of permitted General Plan land uses. In addition, the study shall identify the project’s contribution and shall provide locations and sizes of catchments and system connection points and all downstream drainage mitigation measures.
279
PROJECT NO. PL 24-0098 (SA) 2 July 1, 2025

1.5. Prepare and submit a final grading plan showing building footprints, pad elevations, finished grades, drainage routes, retaining walls, erosion control, slope easements and other pertinent information in accordance with Appendix J of the California Building Code, latest edition.

1.6. Provide a certificate, from a Registered Civil Engineer, certifying that the finished grading has been completed in accordance with the City approved grading plan.

1.7. Submit a soils/geology report in accordance with Appendix J of the California Building Code, latest edition to the project engineer for review and approval.

1.8. Design per City Standards and construct full public improvements for all impacted and interior streets/facilities in accordance with City Code, Standards and Specifications. Such public improvements shall include, but not be limited to, the following (1):

Street Names
Schaefer
Ave
Oaks
Ave
Curb & Gutter (Offset from Centerline) 36’ 22’
Sidewalk (Width) 5’ (2) 5’ (2)
Asphalt Concrete Pavement on Aggregate
Base (Width from Centerline)
Asphalt Concrete Overlay (3) X X
Street Lights (4) X X
Median Island and Landscaping
Parkway Landscaping (5) X X
Striping and Traffic Controls (6) X X
Traffic Signal Interconnect
Conduit System for CATV
Sewer (7) X
Storm Drain X
Domestic Water (8) X X
Recycled Water
Fire Hydrants as required by CVIFD (9) X X
Driveways approaches (10) X X

1. The public improvements listed above are required along the south side of Schaefer Avenue and the west side of Oaks Avenue as specified in our municipal code and per the City of Chino’s General Plan. All required street improvements should follow the new City standard for street trenching backfill and repair. Repair all damage to existing public improvements due to the proposed construction activities and as requested by the Public Works Inspector.

2. The sidewalk shall be extended along the project frontage on Schaefer Ave to the existing catch basin located near the northwesterly corner of the project site. ADA ramps shall be constructed at the southwest and southeast corners of Schaefer and Oaks to align with ADA standards.

3. Grind and overlay a minimum of 2 inches of the existing asphalt pavement along the project frontage in accordance with City of Chino standards. The limits of work shall extend to the street centerline along Oaks Avenue. The extent of asphalt pavement along Schaefer Avenue shall be determined based on the limits shown on the approved precise grading plan, including any areas impacted by new driveway installation, utility connections, or accessibility improvements.

4. Streetlights shall be installed per City of Chino standards and shall utilize an unmetered service pedestal.

5. The parkway maintenance shall be the responsibility of the property owner.

6. Extent of the signing & striping plan shall be dictated by the City Traffic Engineer.

7. Abandon unused sewer service(s) where applicable, per City standards. 280
PROJECT NO. PL 24-0098 (SA) 3 July 1, 2025

8. Provide new water meters and services and abandon unused water meters and services where applicable, per City standards.

9. All existing fire hydrants that require relocation will need to be upgraded to the latest model per City of Chino standards.

10. All proposed driveway approaches shall be constructed per City Std. No. 250 with 5-ft sidewalks.

Minimum width shall be 30-ft. Minimum radii per City and Chino Valley Independent Fire District (CVIFD) requirements.

1.9. All improvements shall comply with federal, state, and local accessibility regulations and standards. a. The review or approval of plans and specifications by the City does not permit the violation of any section of the federal law, state law, building code, or local ordinance. b. Where accessibility standards are contradictory, the provision that provides the most accessible (restrictive) condition shall apply.
c. Where the project’s conditions of approval conflict with accessibility regulations and standards, the prevailing provision shall be determined by City’s Accessibility Coordinator and City Engineer.

Pedestrian facilities (privately or publicly owned) that are open to the public shall comply with the City's Policy on Accessible Pedestrian Facilities, accessibility standards in the CBC, and ADA regulations at Part 36 of Title 28, which include the 2010 (ADA) Standards.

Accessibility of existing and proposed building improvements will be evaluated by the City’s building department. Those comments and requests are in addition to those provided herein.

1.10. Design and install a monitoring manhole (per City Standard No. 530) on each domestic sewer lateral connection from any industrial building into the City's main sewer or into a private sewer main that is tributary to the City's main sewer. In addition, design and install a sampling Wye on a stubbedout sewer lateral connection into the main sewer for each industrial building in this development.

1.11. Execute a Public Improvement Agreement and submit security in an amount acceptable to the City Engineer to guarantee construction of the public improvements listed in 1.8. All security must be accessible to the City at any time and in a form acceptable to the City Engineer, pursuant to Government Code, Section 66499.

1.12. Complete and file the petition for annexation of your project property to the City's Landscape and Street Lighting Maintenance District MD 2002-01.

1.13. Annex into the current services special tax community facilities district of the City (the “City Services CFD”) through the submission of an application to the City’s Finance Department along with the payment of $11,000.00 plus the per parcel fee, for the City’s outside costs of the annexation process, or (II) form a new City community facilities district with a services special tax component commensurate with the City Services CFD, or (III) provide a lump sum payment to the City which, based on current interest rate conditions, is projected to finance in perpetuity the same services projected to be provided through annexation into the City Services CFD. Upon completion of the annexation, an annual special tax will be assessed on the property tax bill to each Assessor Parcel at an established rate set by the City Services CFD document entitled “Rate and Method of Apportionment” available for review in the CFD Annual Report located at:
https://www.cityofchino.org/222/Community-Facilities-District-Mello-Roos This annual tax is used to fund Police, Fire and other municipal services provided to residents and businesses in the general City.
281
PROJECT NO. PL 24-0098 (SA) 4 July 1, 2025

1.14. Obtain design and plan approval from appropriate utility companies for undergrounding all utility lines adjoining and interior to the project, including power lines of 34.5kV or less in accordance with City Code, Chapter 13.32.

1.15. Comply with all applicable requirements of the City Code.

1.16. The project must ensure that all pedestrian facilities (private or publicly owned) that are open to the public shall comply with accessibility standards in the City’s Policy on Accessible Pedestrian Facilities, the current edition of the CBC in effect at the time of building permit issuance or, if no permit, the date construction commences, and Part 36 of Title 28 of the Americans with Disabilities Act (ADA) regulations, which include the 2010 ADA Standards. This includes the following structures and facilities:
a. Sidewalks and walks (public right of way sidewalk, walks within the development); b. Curb ramps (should be directional with one curb ramp provided for each pedestrian crossing and shall comply with the City’ Policy on Accessible Pedestrian Facilities); c. Pedestrian crossings at driveways; and
d. Crosswalks (marked, unmarked, signalized)

1.17. Existing pedestrian facilities on the frontage of the development, open to the public within the development, shall be evaluated for accessibility. The street frontage includes all adjacent pedestrian facilities, created by, extended from, or connected to any required or provided sidewalks improvements. The frontage may include sidewalks, curb ramps, connecting crosswalks (marked and unmarked), and other associated pedestrian facilities (on-street parking space, etc.). a. The following existing improvements shall be made compliant with accessibility regulations as a part of this project:
i. sidewalks/walks
ii. curb ramps near the southwest and southeast corners of Schaefer Ave and Oaks Ave iii. crosswalk pavement and associated pedestrian facilities (pedestrian push buttons, maneuvering space, clear space)
iv. driveway approaches crossings
v. parking space
b. Improvements that are non-compliant with the accessibility standards in effect at the time of construction or alteration, shall be brought up to current accessibility standards. This work shall be incorporated into the scope of this project and shall be completed prior to acceptance by the City.
c. Improvements that are compliant with the accessibility standards in effect at the time of construction, shall be documented on a separate construction plan with detailed specifications (running and cross slopes of all pedestrian walking surfaces, locations, dimensions and slopes of maneuvering spaces and landings, width of sidewalk, clear width and vertical clearance from obstructions). The accessibility of existing improvements will be verified by City inspection staff upon completion of the project. Discrepancies between documented existing conditions and existing conditions as measured by City staff shall be remediated and brought up to accessibility standards as part of the project.

1.18. Pay all applicable fees pursuant to City Code including, but not limited to, the Development Impact Fees (DIF) and Sewage Facilities Development Fee (SFDF). The actual amount of fees due to the City will be based on the fee schedule in place on the date that the fees are due, or the date that they are paid, whichever occurs last. The fee amount stated in this notice is subject to change based on (1) annual adjustments for inflation, pursuant to Chino Municipal Code Section 3.40.100 282
PROJECT NO. PL 24-0098 (SA) 5 July 1, 2025
or 3.45.100, (2) revisions to the Chino Municipal Code, and (3) updates to the fee studies and nexus reports adopted by the City.

Developer is solely responsible for remaining informed about changes in the fee amounts. City shall have no obligation to inform Developer of changes in the fee amounts unless Developer requests notice of such changes, pursuant to Government Code Section 66019(b) and Chino Municipal Code Section 3.40.080(B) or 3.45.080(B).

1.19. All projects developing one (1) acre or more of total land area, or which are part of a larger phased development that will disturb one acre of land, are required to obtain coverage under the State Water Resources Control Board’s (SWRCB) General Permit for storm water discharges associated with construction activity. Proof of filing a Notice of Intent (NOI) with the SWRCB for coverage under this permit is required. A copy of the Waste Discharger’s Identification Number (WDID), issued by the SWRCB, must be submitted to the Project Engineer prior to issuance of grading permits. More detailed information regarding this General Permit, applicable fee information and the necessary forms to complete the NOI are available by calling (916) 341-5537 or on the SWRCB web site at:
http://www.swrcb.ca.gov/water_issues/programs/stormwater/constpermits.shtml.

1.20. Pursuant to Santa Ana Regional Water Quality Control Board Order Number R8-2010-0036, NPDES Permit No. CAS618036, prepare a project-specific Water Quality Management Plan (WQMP) and submit to the project engineer for review and approval. To address NPDES Permit requirements to the maximum extent practicable, the project shall be designed to specify preferential use of Low Impact Development Best Management Practices that reduce pollutants and runoff volume through structural measures (e.g., infiltration, harvesting, and bio-treatment) and non-structural measures (e.g., preserving natural areas, clustering development, and reducing impervious areas). The WQMP shall conform to the requirements of the San Bernardino County Stormwater Program, 2013 WQMP Technical Guidance Document and include the Trash Order Implementation Plan requirements.

1.21. Any future maintenance and repair of sewer laterals, except for the portion of lateral located within the public right-of-way or public easement, and domestic water or fire service laterals to the project site shall be the sole responsibility of the applicant/property owner in accordance with City Code, Chapter 13.04.175 and 13.12.150.

1.22. City staff shall determine the type of water (potable or recycled) to be used for grading operations, dust control activities, and common area/public landscape irrigation at the time of permit issuance.

1.23. All public street corners shall have a minimum curb radii per City Code, Chapter 19.06 and City Standards and Specifications.

1.24. Provide adequate sight distance per City Standard No. 865 for each project driveway and at all intersections. Landscaping type and height shall be maintained to ensure sight distance requirements are perpetuated.

1.25. Comply with all requirements of the Traffic Impact Analysis (TIA) dated May 21, 2025 including participation in fair share contributions (if applicable) and construction of required improvements.

1.26. If the design of the proposed curb ramps requires modifications to the existing traffic signal at the intersection of Schaefer Avenue and Oaks Avenue, the developer shall be responsible for implementing those modifications. During construction, the developer shall be responsible for any damages attributed to the construction of related public improvements and shall coordinate with the Transportation Division and the City’s designated traffic signal maintenance company for technical support of the traffic signal during construction until such time as the improvements are accepted by the City to the satisfaction of the City Engineer.

1.27. Submit to the City electronic files, in Adobe Acrobat PDF format, of all submittals, including reports, studies, improvement plans and City redlines of previous submittals. Include AutoCAD and Esri GIS shape files as an e-transmitted zip file of all approved improvement plans. 283
PROJECT NO. PL 24-0098 (SA) 6 July 1, 2025

1.28. The Developer may coordinate with the City to identify any eligible development impact fee (DIF) credits in accordance with the Chino Municipal Code. If any credits are identified, the Developer shall enter into a mutually agreed-upon DIF credit agreement with the City, which shall be subject to City Council approval.

2.0 PRIOR TO REQUEST FOR AND RELEASE OF OCCUPANCY PERMITS/ACCEPTANCE OF PUBLIC IMPROVEMENTS:

2.1. Construct and secure Public Works Department approval of all public facilities enumerated under Section 1.0 above (per Resolution No. 88-23).

2.2. Underground all utility lines adjoining and interior to the project, including power lines of 34.5kV or less in accordance with City Code, Chapter 13.32

2.3. Distribute for signature of all buyers, the information and disclosure notice announcing that the development will be annexed to the City's Landscape and Street Lighting Maintenance Assessment District before transfer of property title and completion and acceptance of all public improvements.

2.4. The applicant’s Civil Engineer shall field verify that all BMPs are designed, constructed, and functional in accordance with the approved WQMP. BMPs shall also be inspected by Public Works Environmental staff. Coordinate inspection with staff and submit a completed City of Chino BMP field verification form for review and approval.

2.5. Provide and record a reciprocal use and maintenance agreement to assure common ingress and egress and joint maintenance of all common access, parking areas and drives.

2.6. Pay all remaining applicable fees pursuant to City Code.

2.7. Rehabilitate all street pavement impacted by utility trench repairs as directed by City staff. Install signing and striping per approved plans.

2.8. Submit to the City, electronic files of Tract/Parcel Map and “as-built” improvement plans in AUTOCAD, Esri GIS shape and Adobe Acrobat PDF formats. AUTOCAD files shall be submitted as an etransmitted zip file of the CAD drawings with all base files attached. Scanned resolution of PDF shall be a minimum of 360 dpi.

3.0 PRIOR TO FINAL ACCEPTANCE/PROJECT CLOSEOUT:

3.1 Complete all Conditions of Approval listed under Sections 1-3 above.

3.2 Submit to the City, electronic files of “as-built” improvement plans in AUTOCAD, Esri GIS shape and Adobe Acrobat PDF formats. AUTOCAD files shall be submitted as an etransmitted zip file of the CAD drawings with all base files attached. Scanned resolution of PDF shall be a minimum of 360 dpi.

Attachment
284
Rev 6/6/23

CITY OF CHINO

PUBLIC WORKS DEPARTMENT

DEVELOPMENT ENGINEERING DIVISION
PROJECT NO. PL24-0097(SCUP)/-0098 (SA)/-0120 (SCUP)
PROJECT ENGINEER: Daniel Aguirre
DATE: 7/1/2025

A COPY OF THIS CHECK LIST MUST BE PROVIDED ALONG WITH A COMPLETED PLAN CHECK REVIEW APPLICATION TO THE

ENGINEERING TECHNICIAN WHEN MAKING AN APPOINTMENT FOR FIRST PLAN CHECK SUBMITTAL Copy of Development Engineering Division Conditions of Approval Plan Check Fee Calculation Form
Maps (Subdivision Only)
Preliminary Title Report (no older than six months) (Subdivision Only) Closure Calculations (Subdivision Only)
Referenced Maps (Subdivision Only)
Preliminary Soils Report (no older than sixty days)
Lot line adjustment certificate
Lot merger
Right-of-way dedication
Rough Grading Plans
Precise Grading Plans
Storm Drain Plans
Hydrology and Hydraulic Calculations with Backup Data (Signed and Sealed by a Registered Civil Engineer)
Engineering Cost Estimate (On City Forms) with Engineer’s Wet Signature and Stamp Street Improvements Plans
Cross-Sections (if street plans are required) at 50’ intervals and extended a minimum of 100’ beyond limits of improvements
Sewer Plans (Delta revisions for proposed connections)
Domestic Water Plans (Delta revisions for proposed connections) Recycled Water Plans
Street Light Plans
Voltage Drop Calculations (Signed and Sealed by a Registered Engineer) Signing and Striping Plans
Traffic Signal Interconnect Plans
Traffic Signal Plans (dependent on curb ramp design)
Water Quality Management Plan
Construction Management Plan
285
Special Districts Leadership Foundation - District of Distinction Since 2008 June 25, 2025
It is a recommendation of the Fire District that the developer of every new construction project facilitate a preconstruction meeting. The meeting is to be scheduled with the Fire District Inspector for said project.

The following are the conditions of the above referenced permit/project. All conditions shall be adhered to, failure to comply with said conditions may result in the revocation of said permit and/or punitive fines as outlined in the Fire District fee schedule.

We look forward to a cooperative working relationship throughout the project. Should you have any questions regarding the project, including the conditions as set forth herein, please feel free to contact our office at (909) 902-5280.

1.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO RECORDATION:

1.1 Fire access roads shall be designed and plans submitted to the Fire District for approval.

Fire access roads shall be constructed of an all-weather hard surface, such as, asphalt or concrete, and be a minimum unobstructed width of 26 feet and minimum clear height of 13’6”. The road grade shall not exceed twelve percent (12%) maximum. An approved turn around shall be provided at the end of each roadway in excess of 150 feet in length. Aerial access shall be provided for any buildings 30’ ft. and higher per 2019 CFC. Appendix D. A 26’ ft. wide access road shall be a minimum of 15’ ft. to the building and a maximum of 30’ ft. from the building. Access roads shall comply with Fire District Standard No. 111.

Chino Valley Fire District
14011 City Center Drive
Chino Hills, CA 91709
(909) 902-5260 Administration
(909) 902-5250 Fax
Chinovalleyfire.org
2024-00002066
Fire Protection Requirements

GATEWAY TERMINAL LLC
13925 CITY CENTER DR STE 200
CHINO HILLS, CA - California 91709
Project Name: GATEWAY TERMINAL, PL24-
0097(SCUP), PL24-0098 (SA), PL24-0120
Project Address: 5835 & 5885 Schaefer Ave.

Chino, CA. 91710

Board of Directors
Sarah-Ramos Evinger
President
Mike Kreeger
Vice President
Tom Haughey
Harvey Luth
Andrew Romaine
Fire Chief
Dave Williams
286
Special Districts Leadership Foundation - District of Distinction Since 2008

1.2 The development and each phase shall have two (2) points of vehicular access during construction. Fire District Standard No. 111 shall be complied with.

1.3 Water systems shall be designed to meet the required fire flow of this development and be approved by the Community Risk Reduction Division. Buildings in excess of 100,000 square feet shall have a minimum of two (2) connections to a public main. The developer shall furnish the Community Risk Reduction Division with three (3) copies of the water system working plans done by the installing contractor for approval, along with the Fire Flow Availability Form completed by the water purveyor prior to recordation. The required fire flow shall be determined by using the California Fire Code, current adopted edition. For all private systems, the water systems shall comply with Fire District Standard Nos. 101, 102, and 103. In areas without water-serving utilities, fire protection water systems shall be based on NFPA Pamphlet 1231. For water connections and work conducted in the public right of way, please refer to separate plans reviewed and approved by the water purveyor.

1.4 Fire hydrants shall be six-inch (6") diameter with a minimum one four-inch (4") and one two and one-half inch (2-1/2") connections. All fire hydrants shall be spaced a maximum of three hundred feet (300') apart. Private water systems shall comply with Fire District Standard Nos. 101, 102, and 114. All hydrants shall be installed with pavement markers to identify their locations.

1.5 Access drives which cross property lines shall be provided with CC & R's, access easements or reciprocating agreements and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.

1.6 Underground fire mains which cross property lines shall be provided with CC & R's, easements, or reciprocating agreements addressing the use and maintenance of the mains and hydrants and shall be recorded on the titles of affected properties. Copies of the recorded documents shall be provided at the time of Fire District plan review.

2.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO ISSUANCE OF BUILDING PERMIT:

2.1 Fire access roads shall be constructed and approved by the Community Risk Reduction Division prior to combustibles being brought onto the site.

2.2 Approved street signs shall be installed prior to issuance of building permits, as well as a job site address.

2.3 Fire Protection water systems shall be tested, operational, and approved by the Community Risk Reduction Division prior to combustible materials being brought to the site.

2.4 All flammable vegetation shall be removed from each building site for a minimum distance of thirty feet (30') from any flammable building material including all structures. 287
Special Districts Leadership Foundation - District of Distinction Since 2008

2.5 A detailed site plan of the development is required to be submitted in electronic (pdf.) format. The plan must show and be limited to: locations of property lines, buildings, and equipment and hazards for emergency response purposes. Please refer to Fire District Standard No. 143. Additional or revised files may be required during construction and/or prior to final signoff.

2.6 The Developer shall submit, as an electronic file, a drawing of the new streets in pdf format to the Fire District with the building construction plans. Format must contain and be restricted to the following layers: A. Right of way; B. Parcel Lines; C. Street Names; D. Address numbers; E. Fire Hydrants. Additional or revised files may be required during construction and/or prior to final signoff.

3.0 THE ITEMS BELOW ARE CONDITIONS OF APPROVAL AND ARE TO BE COMPLETED PRIOR TO OCCUPANCY:

3.1 An automatic protection fire sprinkler system is required for all buildings 5,000 sq. ft or greater. and/or when used for allowable area increase, if applicable. This system shall comply with NFPA Standard No. 13 and Fire District Standard No. 110. An electronic/PDF set of detailed plans along with hydraulic calculations and material specifications shall be submitted to the Community Risk Reduction Division. The system shall be installed, tested and approved prior to system final. Fire sprinkler systems shall be installed by a licensed C-16 contractor and the contractor is required to submit a report to The Compliance Engine (TCE).

3.2 An automatic fire alarm system is required. An electronic/PDF set of detailed plans shall be submitted showing the design, system components, signaling devices, fire alarm power supply, control panel and auxiliary devices and functions of the alarm system. Please refer to Fire District Standard No. 133 and current adopted editions of the California Building Code, as well as NFPA Standard 72. The contractor is required to submit a report to The Compliance Engine (TCE).

3.3 Approved in-building, two-way emergency responder communication coverage for emergency responders shall be provided in all new buildings, if ERRC evaluation determines the need for installation of system. In-building, two-way emergency responder communication coverage within the building shall be based on the existing coverage levels of the public safety communication systems utilized by the jurisdiction, measured at the exterior of the building. System shall comply with current adopted edition of the California Fire Code, NFPA 70, 72 & 1221 and the contractor is required to submit a report to The Compliance Engine (TCE).

3.4 An automatic fixed fire extinguishing system may be required. An electronic/PDF set of detailed plans shall be submitted to the Community Risk Reduction Division for approval.

System shall comply with current adopted edition of the California Fire Code, NFPA Standard 17-A, and UL 300. Please refer to Fire District Standard No. 112. The contractor is required to submit a report to The Compliance Engine (TCE).

3.5 Insulated liquid carbon dioxide systems with more than 100 pounds (45.4 kg) of carbon dioxide used in beverage dispensing applications shall comply with CFC, Section 5307.3.1., and shall be provided with mechanical ventilation or a gas detection system. The contractor is required to submit a report to The Compliance Engine (TCE). 288
Special Districts Leadership Foundation - District of Distinction Since 2008

3.6 A maximum occupant load sign shall be posted in a conspicuous location neat the main entrance/exit of the room, if occupant load is greater than 49 people. Such sign shall be legible.

3.7 Hand-held portable fire extinguishers are required to be installed. The location, type and cabinet design shall be approved by the Community Risk Reduction Division.

3.8 Exits, doors, signs and approved path marking shall be installed in accordance with the current adopted edition of the California Building Code, Section 1007

3.9 "No Parking - Fire Lane" signs shall be installed in interior access drives at locations designated by the Community Risk Reduction Division. Curbs shall be painted red at locations designated by the Community Risk Reduction Division. Please refer to Fire District Standard No. 121.

3.10 An approved recessed Fire Department "KNOX" brand key box is required. The key box shall be located at or near the main entrance(s), and shall be provided with a tamper switch and shall be monitored by an approved central station monitoring service. Please refer to Fire District Standard No. 117.

3.11 An approved Knox key switch and/or Knox lock is required on each automatic electric or manual gate that crosses an EVA. All automatic gates shall be provided with a manual override. Fire District Standard No. 116 & 117 shall be complied with.

3.12 Commercial, industrial, and multi-family building addresses shall be posted with a minimum eight inch (8") numbers, visible from the street and during the hours of darkness they shall be internally or externally electrically illuminated. Posted numbers shall contrast with the background used and be legible from the street.

Where building set back exceeds 100 feet from the roadway, additional non-illuminated six inch (6") numbers shall be displayed at the property access entrance. These numbers shall also contrast with the background used. Fire District Standard No. 122 must be complied with.
289
Special Districts Leadership Foundation - District of Distinction Since 2008

3.13 An electronic/PDF set of plans shall be submitted separately for each of the following listed items to the Fire District for review, approval and permit prior to any installation or work being done. Approved plans must be maintained at the worksite during construction. Fees are due at the time of submittal.

a) Building Construction, includes tenant improvement work b) Private (onsite) Underground Fire Protection Water Systems, if applicable c) Fire Sprinkler Systems, designed by C16 contractor or registered engineer d) Fire Alarm Systems or Sprinkler Monitoring Systems designed by a C7, C10 contractor or registered engineer.
e) Knox box and/or security gate locations.
f) Gas detection systems
g) Emergency Responder Radio Coverage Systems
Applicable Standards:
101, 102, 103, 110, 111, 114, 117, 121, 122, 133, 141, 143 CVFD Standards available online at http://www.chinovalleyfire.org 290

Page 1 of 2 ends

Appeal Application
CITY of CHINO
Development Services Department
Planning Division
13220 Central Avenue
Chino, CA 91710
(909) 334-3253
www.cityofchino.org
Staff Use Only
File No. Date Received Filing Fee
 Resident
 Non-Resident
Received By
Related Files Time Received Receipt No. Supervisor Authorization The applicant or any interested aggrieved person may appeal the determination of the Development Services Director or Planning Commission within ten (10) calendar days from the date of such determination. The appeal must be in writing in accordance with Section 20.23.150 of the City of Chino Zoning Ordinance. The required appeal fee as adopted by the City Council must accompany an appeal to the Planning Commission of a decision of the Development Services Director or an appeal to the City Council of a decision of the Planning Commission or it will be considered incomplete and the appeal will not be considered. A building permit will not be issued until after the 10-day appeal period is complete. If an action of the Commission is appealed, the City Council will hear the appeal and render a final decision.

Appeal Process
 An appeal to the Planning Commission of an administrative action or determination  An appeal to the City Council of a Planning Commission action or determination  An appeal to the City Council of an environmental action or determination Type of Appeal Requested
Project number(s):

Project address or location:

Contact Name: Phone Number:

Email Address: Fax Number:

Mailing Address:

Appellant’s Name: Phone Number:

General Information (Print of Type)
Supporters Alliance for Environmental Responsibility (SAFER) 510-836-4200 1939 Harrison Street, Suite 150 Oakland, CA 94612
[email protected]
Victoria Yundt 510-836-4200
X
PL24-0097, PL24-0098, PL24-0120
Located at the southwest corner of Schaefer Avenue and Oaks Avenue (APNs: 1021-052-04, -06, -09 and -11) Specific action or decision which is being appealed:

The Planning Commission's July 16, 2025 decisions to (1) adopt Resolution No. PC2025-012, approving the Chino Gateway Terminal Project including PL24-0097 (Special Conditional Use Permit), PL24-0098 (Site Approval), and PL24-0120 (Special Conditional Use Permit); and (2) adopt an Addendum to the City of Chino General Plan Environmental Impact Report (SCH No. 2008091064), certified in 2010, for the Project.

Specific grounds for the appeal, and the relief requested is as follows:

The grounds for this appeal are set forth in the attached letter, dated July 15, 2025. SAFER requests that the City Council withdraw the Planning Commission's approval of the Project and Addendum and direct staff to prepare an initial study for the Project, followed by a project-specific EIR or negative declaration as required by CEQA.

EXHIBIT C
291

Page 2 of 2 ends

Appellant’s Affidavit
I hereby certify that the statements and information contained herein are in all respects true and correct to the best of my knowledge and belief.

Appellant’s Signature: _________________________________________ Date: ___________________________ Print Name: _________________________________________________ Relationship to Subject Appeal:
 Property Owner
 Business Owner
 Resident
 Other:

Victoria Yundt
292
July 15, 2025

VIA EMAIL
Jimmy Alexandris, Chairperson
Lissa Fraga, Vice Chairperson
Brandon Blanchard, Commissioner
Kevin Cisneroz, Commissioner
Steve Lewis, Commissioner
Vincent Lopez, Commissioner
Lawrence Vierira, Commissioner
Planning Commission
City of Chino
P.O. Box 667
Chino, CA 91708-0667
[email protected]
Kim Le, Senior Planner
Development Services Department
City of Chino
13220 Central Avenue
Chino, CA 91710
[email protected]
Re: Comment on Addendum to the City of Chino General Plan EIR (SCH 2008091064) for the Chino Gateway Terminal Project July 15, 2025 Planning Commission Agenda Item 4
Dear Chair Alexandris, Vice Chair Fraga, Honorable Planning Commissioners and Ms. Le:

This comment is submitted on behalf of Supporters Alliance for Environmental Responsibility (“SAFER”) regarding the Chino Gateway Terminal Project (PL24-0097, PL24-0098, PL24-0120), which proposes demolition of three existing buildings and associated ancillary structures (totaling 17,716 square feet) and the development of a 158,548 square-foot warehouse building and a 3,520 square-foot multi-tenant restaurant building, located on an approximately 7.35-acre site bounded by Schaefer Avenue and Oaks Avenue intersection in the City of Chino, on Accessor’s Parcel Numbers 1021-052-04, 1021-052-06, 1021-052-09, and 1021-052-11 (“Project”), to be heard as Agenda Item 4 at the Planning Commission’s July 15, 2025 meeting.

SAFER objects to the City’s reliance on an Addendum to the City of Chino General Plan Environmental Impact Report (SCH No. 2008091064), certified in 2010 (“GPEIR”), for the Project. Under the California Environmental Quality Act (“CEQA”), an addendum is not appropriate because the Project is not within the scope of the prior program EIR and there is new information available since certification of the 2010 GPEIR indicating new significant impacts and/or the availability of new mitigation measures. Therefore, SAFER requests that the Planning Commission refrain from taking any action on the Project at this time and, 293
July 15, 2025
Comment on Addendum to the City of Chino General Plan EIR for the Chino Gateway Terminal Project

Page 2 of 2 ends

instead, direct staff to prepare an initial study for the Project, followed by a project-specific EIR or negative declaration as required by CEQA.

Sincerely,
Rebecca Davis
LOZEAU | DRURY LLP
294
September 16, 2025

VIA EMAIL
Eunice M. Ulloa, Mayor
Curtis Burton, Mayor Pro Tem
Karen Comstock, Councilmember
Christopher Flores, Councilmember
Marc Lucio, Councilmember
Walt Pocock, Councilmember
Natalie Gonzaga, City Clerk
City of Chino
13220 Central Avenue
Chino, CA 91710
[email protected]
Kim Le, Senior Planner
Development Services Department
City of Chino
13220 Central Avenue
Chino, CA 91710
[email protected]
Re: Comment on Addendum to the City of Chino General Plan EIR for the Chino Gateway Terminal Project, September 16, 2025 City Council Agenda Item 17
Dear Mayor Ulloa and Honorable City Councilmembers:

This comment is submitted on behalf of Appellant Supporters Alliance for Environmental Responsibility (“SAFER”) regarding the Chino Gateway Terminal Project, which proposes the development of a 158,548 square-foot warehouse building and a 3,520 square-foot multi-tenant restaurant building, located on an approximately 7.35-acre site bounded by Schaefer Avenue and Oaks Avenue intersection in the City of Chino (“Project”), to be heard on appeal as Agenda Item 17 at the City Council’s September 16, 2025 meeting.

SAFER objects to the City’s reliance on an Addendum to the City of Chino General Plan Environmental Impact Report, certified in 2010 (“General Plan EIR”), for the Project.

Under the California Environmental Quality Act (“CEQA”), an addendum is not appropriate because there is new information available since certification of the General Plan EIR indicating new significant impacts and the availability of new mitigation measures.

SAFER submits the following comment and related exhibits to inform the City Council of the new, significant impacts that the Project will have on individuals living and working in the City of Chino, which were not addressed or mitigated in the 2010 General Plan EIR or Addendum. Specifically, the comment and related exhibits address the Project’s potentially significant biological resources, air quality, health, and noise impacts. As evidenced by the expert comments submitted by expert wildlife ecologist Dr. Shawn 295
September 16, 2025
Comment on Chino Gateway Terminal Project Addendum

Page 2 of 17 ends

Smallwood, Ph.D., air quality expert Dr. James Clark, Ph.D., and noise expert Ani Toncheva of Wilson Ihrig, CEQA requires that an updated, new initial study and a subsequent EIR, or, at the very least, an MND be prepared for the Project prior to approval. Dr. Smallwood, Dr.

Clark, and Ms. Toncheva’s written comments and CVs are attached as Exhibits A, B, and C, respectively.

Therefore, SAFER requests that the City Council not approve this Project or the Addendum, and instead refer it back to staff to address these shortcomings in an initial study and subsequent mitigated negative declaration or environmental impact report.

PROJECT DESCRIPTION
The Project proposes demolition of three existing buildings and associated ancillary structures (totaling 17,716 square feet) and the development of a 158,548 square-foot warehouse building and a 3,520 square-foot multi-tenant restaurant building, located on an approximately 7.35-acre site bounded by Schaefer Avenue and Oaks Avenue intersection in the City of Chino. The Project site is partially undeveloped.

The Project is anticipated to generate up to 72 employees (18 restaurant employees and 54 warehouse employees). The hours of operation for the proposed facilities include 8:00 a.m. to 10:00 p.m., 7 days per week for the restaurant tenants and 24 hours per day, and 7 days per week for the industrial tenants.

LEGAL STANDARD
CEQA contains a strong presumption in favor of requiring a lead agency to prepare an EIR. This presumption is reflected in the fair argument standard. Under that standard, a lead agency must prepare an EIR whenever there is substantial evidence in the whole record before the agency that supports a fair argument that a project may have a significant effect on the environment. (Pub. Res. Code § 21082.2 (“PRC”); Laurel Heights Improvement Ass’n v.

Regents of the University of California (1993) [“Laurel Heights II”] 6 Cal.4th 1112, 1123; No Oil, Inc., 13 Cal.3d at 75, 82; Quail Botanical Gardens v. City of Encinitas (1994) 29 Cal.App.4th 1597, 1602.)
Preparation of an Addendum Under CEQA
The City prepared the Addendum to the previously certified 2010 General Plan EIR.

Pursuant to the CEQA Guidelines, an addendum to a previous EIR is proper only where “some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR have occurred.” (14 CCR § 15164(a).) Looking to Guidelines Section 15162, an addendum is not appropriate when:
(1) Substantial changes are proposed in the project which will require major revisions of the previous EIR or negative declaration due to the involvement of new 296
September 16, 2025
Comment on Chino Gateway Terminal Project Addendum

Page 3 of 17 ends

significant environmental effects or a substantial increase in the severity of previously identified significant effects;
(2) Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previous EIR or Negative Declaration due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
(3) New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
(A)The project will have one or more significant effects not discussed in the previous EIR or negative declaration;
(B) Significant effects previously examined will be substantially more severe than shown in the previous EIR;
(C) Mitigation measures or alternatives previously found not to be feasible would, in fact, be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or
(D)Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. (14 CCR § 15162.)
Tiering Under CEQA
CEQA permits agencies to “tier” CEQA documents, in which general matters and environmental effects are considered in a document “prepared for a policy, plan, program or ordinance followed by narrower or site-specific [environmental review] which incorporate by reference the discussion in any prior [environmental review] and which concentrate on the environmental effects which (a) are capable of being mitigated, or (b) were not analyzed as significant effects on the environment in the prior [EIR].” (Pub. Res. Code [“PRC”] § 21068.5.) “[T]iering is appropriate when it helps a public agency to focus upon the issues ripe for decision at each level of environmental review and in order to exclude duplicative analysis of environmental effects examined in previous [environmental reviews].” (Id. § 21093.) CEQA regulations strongly promote tiering of environmental review. “Later activities in the program must be examined in light of the program [document] to determine whether an additional environmental document must be prepared.” (14 CCR § 15168(c).) The first consideration is whether the activity proposed is covered by the program. (Id. § 15168(c)(2).) If a later project is outside the scope of the program, then it is treated as a separate project and the previous environmental review may not be relied upon in further review. (See, Sierra Club v. County of Sonoma (1992) 6 Cal.App.4th 1307, 1320-21.) The 297
September 16, 2025
Comment on Chino Gateway Terminal Project Addendum

Page 4 of 17 ends

second consideration is whether the “later activity would have effects that were not examined in the program.” (14 CCR § 15168(c)(1).) A program environmental review may only serve “to the extent that it contemplates and adequately analyzes the potential environmental impacts of the project . . . .” (Sierra Nevada Conservation v. County of El Dorado (2012) 202 Cal.App.4th 1156, 1171 [quoting Citizens for Responsible Equitable Envtl. Dev. v. City of San Diego Redevelopment Agency (2005) 134 Cal.App.4th 598, 615].) If the program environmental review does not evaluate the environmental impacts of the project, a tiered CEQA document must be completed before the project is approved. (Id. at 1184.) For these inquiries, the “fair argument test” applies. (Sierra Club, 6 Cal.App.4th at 1318; see also Sierra Club v. County of San Diego (2014) 231 Cal.App.4th 1152, 1164 [“when a prior EIR has been prepared and certified for a program or plan, the question for a court reviewing an agency’s decision not to use a tiered EIR for a later project ‘is one of law, i.e., ‘the sufficiency of the evidence to support a fair argument.’”] [quoting Sierra Club, 6 Cal.App.4th at 1318].) Under the fair argument test, a new EIR must be prepared “whenever it can be fairly argued on the basis of substantial evidence that the project may have significant environmental impact.” (Sierra Club, 6 Cal.App.4th at 1316 [quotations and citations omitted].) When applying the fair argument test, “deference to the agency’s determination is not appropriate and its decision not to require an EIR can be upheld only when there is no credible evidence to the contrary.” (Id. at 1318.) “[I]f there is substantial evidence in the record that the later project may arguably have a significant adverse effect on the environment which was not examined in the prior program EIR, doubts must be resolved in favor of environmental review and the agency must prepare a new tiered EIR, notwithstanding the existence of contrary evidence.” (Id. at 1319.)

DISCUSSION
I. UNDER CEQA’S TIERING PROVISIONS, AN EIR, NOT AN ADDENDUM, MUST BE PREPARED FOR THE PROPOSED PROJECT.

A. A Project-Level MND or EIR is Required Because the Project may Result in Significant Environmental Impacts not Previously Analyzed in the 2010 General Plan EIR.

A lead agency may tier EIRs where multiple individual projects or phased projects are to be undertaken, and the individual projects are linked geographically, temporally, or in an otherwise logical manner. (14 CCR §§ 15165, 15168.) Here, the 2010 General Plan EIR is a program EIR subject to CEQA Guidelines section 15168. Under section 15168, “[i]f a later activity would have effects that were not examined in the program EIR, a new initial study would need to be prepared leading to either an EIR or a negative declaration.” (14 CCR § 15168(c)(1) [emphasis added].) Importantly, in reviewing an agency’s decision whether to prepare a tiered EIR, the “fair argument” test applies. (Sierra Club v. Cnty. of Sonoma (1992) 6 Cal.App.4th 1307, 1318.) Under the fair argument test, a new EIR must be prepared “whenever it can be fairly argued on the basis of substantial evidence that the project may have a significant environmental impact.” (Id. at 1316; see also, Friends of Coll. of San 298
September 16, 2025
Comment on Chino Gateway Terminal Project Addendum

Page 5 of 17 ends
← All documents from this meeting