Cities Index.
Agenda packet

Colton City Council
July 15, 2025

Document
Agenda packet
Meeting
July 15, 2025
Body
Colton City Council
Pages
1,440
Original file
263.1 MB
Text extracted from the city's file for reading and search. Open the original on coltonca.api.civicclerk.com. That file is the official record.

4.0 │ DEVELOPMENT REGULATIONS
Revised January 2025 4-22
Conditionally Permitted Uses

1. Attached homes that include stacked flats i.e., two separate dwelling units on different floors in the same building.

2. Senior Housing with densities not to exceed 30 dwelling units per acre.

3. Other uses as determined by the Development Services Director or his / her designee to be substantially compatible with principal permitted uses.

Development Regulations
Refer also to Tables 4-A and 4-B for development regulations and standards.

Parking and Circulation

1. Except as specified in these Development Regulations, parking within the CHCCSP project area shall be pursuant to the City of Colton Zoning Ordinance, Title 18 of the Municipal Code.

2. Parking requirements may be met on local interior streets. Parallel parking stall dimensions shall be a minimum eight feet (8’) by twenty two feet (22’).

The first stall measured from a curb return shall be no less than seven feet (7’) from the tangent (beginning point of curb radius).

Walls and Fences

1. All walls and fences shall be designed to be consistent with the CHCCSP Community Design Guidelines set forth in Section 6.0. No wood fences are permitted within the CHCCSP Project area, except for use as access gates in residential areas.

2. Walls and fences constructed on interior lot lines, or at the rear of the required landscape setback areas shall not exceed six feet (6’) in height unless required by an acoustical study.

3. All privacy walls greater than three feet (3’) in height between two buildings facing a street shall be located behind the front of the structure by a minimum of four feet (4’).

4. All refuse and storage areas shall be screened with a decorative block wall that consists of split-face, slump-stone block, or a stucco finish.

5. All types of barbed or razor wire are prohibited. Chain link fencing is only allowed as a temporary use during construction for security purposes. A time limit for temporary use shall be determined by the Development Services Director or his / her designee.

Lighting

1. Exterior lighting plans are required for each project development application to identify the preliminary layout and type of fixture and pole.

Refer to Section 6.0, Community Design Guidelines, for additional lighting standards.

2. Lighting fixtures shall be properly shielded to prevent off-site glare.

Page 437 of 1440 ends

Revised January 2025 4-23
Minimum Open Space and Landscape

1. Private Open Space: A minimum of one hundred (100) square feet of private open space shall be provided for each dwelling unit. Private open space may include ground floor patios or courtyards with a minimum seven feet (7’) x ten feet (10’) dimension for a ground floor area, and second and third floor balconies or decks, and rooftop decks that are accessible.

2. Common Open Space: All residential uses shall have a minimum of fifteen percent (15%) common area landscape coverage of the project site in addition to landscaped parkways within the street right-of-way and any landscape areas for private use by a resident in an enclosed yard, courtyard or patio.

3. All landscape areas to conform to the Community Design Guidelines and Plant Palette in Section 6.0.

Mechanical Equipment
All exterior mechanical / electrical equipment such as, but not limited to air conditioning units and above ground electrical equipment, shall be screened.

Screening shall be provided with landscape and / or decorative walls.

Page 438 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised January 2025 4-24
TABLE 4-A DEVELOPMENT REGULATIONS AND STANDARDS
RES-M1 DETACHED HOMES
Detached
(Garden Court)
Detached
(Cluster)
Detached
(Motor
Court)
Lot Requirements:
 Minimum Lot Size (Square Feet) per
Dwelling Unit
2,000 2,000 2,000
 Minimum Lot Width: 30’ N/A N/A
 Minimum Lot Width at Corner 35’ N/A N/A
 Minimum Lot Depth 55’ N/A N/A
 Minimum Dwelling Unit Size 1,100 s.f. 1,100 s.f. 1,100 s.f.

Minimum Setbacks: (From R/W or Prop. Line)
Front Building Setbacks:
 Local Streets
1 Story 9’ 9’ 9’
2 Story 10’ 10’ 10’
3 Story 12’ 12’ 12’
 Street A and N. Eucalyptus Ave (Add 3’
to each setback above
 Greenbelts, Courtyards and Parks 1’ 1’ 1’
 Single Story Porch or Balcony
Street A and N. Eucalyptus Ave. 7’ 7’ 7’
All Other Streets 5’ 5’ 5’
Greenbelts, Courtyards and Parks 1’ 1’ 1’
Side Building Setbacks:
 Interior Property Line 3’ 3’ 3’
Residential Street (corner lot)
 1 Story 8’ 8’ 8’
 2 or 3 Story 10’ 10’ 10’
 Open Single Story Porch or Balcony
(corner lot)
8’ 8’ 8’
Rear Building Setbacks:
 Primary Building - Alleyway
(See Note 11)
3’ 3’ 3’
 Garage Face to Alley (Drive Apron) 3’ 3’ 3’
 Open Patio Cover 3’ 3’ 3’
Lot Coverage:
 Maximum Coverage 70% 70% 70%
Maximum Building Height:
 Primary Structures 35’ 35’ 35’
Minimum Building Separation: (see Note 16) (See Figure 4-1)  Front to Front
1 Story to 1 Story 20’ 12’
2 Story to 2 or 3 Story 20’ 15’
3+ Story 28’ 16’
 Rear to Rear (w / Alley) (w / Alley) Non-Alley
1 Story to 1 Story (See Note 11) 28’/ 30’ 28 / 30’ 8’
2 Story to 2 Story (See Note 11) 28’/30’ 28’/30’ 8’
3 Story to 2 or 3 Story See Note 11 30’ 10’
 Side to Side
1 Story to 1 Story 6’ 6’ 6’
2 Story to 2 Story 6’ 6’ 6’
3+ Story to 2 or 3+ Story (*12’ if no entries to
units between buildings)
15’* 15’* 15’*
 Front to Side
1 Story to 1 Story 12’ 6’ 6’
2 Story to 2 Story 15’ 7’ 7’
3+ Story to 2 or 3+ Story 15’ 10’ 10’
Minimum Porch and Balcony Separations
 Front to Front (All stories) 15’ 10’ 10’
Walls and Fences: 15’ 15’ 15’
 Max. Height within Building Setback 4’ 4’ 4’
 Maximum Height other Locations: 6’ 6’ 6’
Parking:
 Minimum Resident Parking in Garage 2 spaces 2 spaces 2 spaces  Minimum Guest Parking .3/DU .3/DU .3/DU

Page 439 of 1440 ends

Revised January 2025 4-25
TABLE 4-B DEVELOPMENT REGULATIONS AND STANDARDS
RES-M1 ATTACHED HOMES
Lot Requirements: Single Family Attached
 Minimum Parcel Size: 4,000 square feet
 Minimum Parcel Width 50’
 Minimum Parcel Depth 60’
Minimum Setbacks (From ultimate R.O.W or PL)
Front Building Setbacks2:

Primary Structure
Public Streets or Property Line
1 Story 9’
2 Story 10’
3 Story 12’
 Street A (Add 3’ to each setback above)
 Greenbelts, Courtyards, and Parks 1’
Open Porch (Single story)
 Street A 7
 Other Public Streets or Property Line 5
 Greenbelts, Courtyards, and Parks 1’
Side Building Setbacks
 Exterior property line 10’
 1 Story (Corner Lot) 8’
 2 to 3 Story (Corner Lot) 10’
 Open porch or balcony (Corner Lot) 8’
Rear Building Setbacks
 Primary building. from Alley Lane 3’
 Garage Face to Alley 3’
 Open Patio Cover or Trellis 3’
Lot Coverage:
 Maximum Coverage 70%
Maximum Building Height:
 Primary Structures 35’
 Accessory Structures 1 story or 10’ below building height of primary structure.

Minimum Building Separation: (See Note 16)
 Front to Front
1 Story to 1 Story 20’
2 Story to 1 or 2 Story 25’ (25% of a building may be 20’) 3+ Story to 2 to 3+ Story 30’ (20% of a building may be 25’)  Rear to Rear (Alley way – See Note 11)
1 Story to 1 Story 28’
2 Story to 1 or 2 Story 28’
3+ Story to 2 to 3+ Story See Note 11
 Side to Side
1 Story to 1 Story 8’
2 Story to 1 or 2 Story 10’
3+ Story to 2 to 3+ Story 15’ (12’ if no side entry)
 Front to Side
1 Story to 1 Story 10’
2 Story to 1 or 2 Story 15’
3+ Story to 2 to 3+ Story 15’
Walls and Fences:
 Max. Height in building setback area. 3’
 Maximum height other locations: 6’
Parking:
 Minimum Resident Parking 1 enclosed space on a garage for 1 bedroom or smaller; 2 enclosed spaces in a garage for a 2 bedroom or
larger.
 Minimum Guest Parking 1 space for each 3 units. Public or private on street parking may be counted toward guest requirements.

Page 440 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised January 2025 4-26
Notes to Tables 4-A and 4-B:

1. All building setbacks are measured from the street rights-of-ways shown in street sections or from the ultimate property line

2. Setbacks along private streets shall be measured from back of sidewalk. If no sidewalk, then from face of curb.

3. Minimum parcel widths shall be measured at the front setback line.

4. For building setbacks and building separations, the minimum dimensions shown in the regulations pertains to the main building structure and not to architectural projections, balconies, porches or patio walls and gates.

5. Architectural projections may project a maximum of three feet (3’) into required front, rear or side setback areas, however in all cases there shall be a minimum clearance of four feet (4’) to an opposing projection, including a building, wall or fence. An architectural projection is defined as an element that articulates the building elevation such as eaves, window and door pop out surrounds, media niches, bay windows, pot shelves, chimneys, enhanced window sills, shutter details, window trim, and other similar elements.

6. Balconies, open covered porches, patio walls and gates are permitted to project into the setbacks and building separations as indicated in the development regulations or as otherwise specified in this document.

7. The minimum depth of an open covered porch shall be five feet (5’). Clearance between opposing porches or balconies shall be fifteen feet (15’) in front to front building orientations, ten feet (10’) other conditions.

8. Side yard slopes of 2:1 or greater shall not encroach more than fifty percent (50%) into yard setback areas.

9. Shared use easements are permitted.

10. Recreational vehicle (RV) parking is prohibited for more than seventy-two (72) hours on residential streets.

11. Alley widths for 2-story or less buildings: Where greater than ten (10) dwelling units, shall include a thirty feet (30’) minimum dimension between buildings, with minimum twenty feet wide (20’) travel lanes and three feet (3’) minimum driveway apron or landscape. Alleys with ten (10) dwelling units or fewer, and that do not to exceed one hundred fifty feet (150’) of alley length may be a minimum of twenty-eight feet (28’) minimum between buildings, with a minimum twenty feet (20’) lane and three feet (3’) minimum driveway aprons or landscape. Buildings 3-story or greater shall be subject to City of Colton Fire Department approval.

12. Building articulation is required on rear building elevations along alleyways.

13. Along a side yard adjacent to an alley, there shall be a minimum of two feet (2’) of planting area where a wall or fence is adjacent to an alley curb or sidewalk, whichever is closer to the wall or fence.

14. Wall and Fence measurements: The height of a wall or fence shall be measured from the highest ground level on either side of the wall or fence. In order to allow for variation in topography, the height of a wall or fence may vary in an amount not to exceed eight inches (8”) provided that in no event shall the average height of the wall or fence exceed the maximum height permitted.

15. For each of the three housing types plan configurations listed in Table 4-A, refer to Figures 6-26 through 6-30. For detached or attached homes that do not clearly fit into any of the categories in Table 4-A or Table 4-B, the Development Services Director or his / her designee shall determine which development regulations from above shall apply.

16. Building separations can be satisfied through any combination of lot setbacks (on private lots). Common lot areas (on HOA lots) or common use easements (on private lots). See Figure 4-1.

Page 441 of 1440 ends
Page 442 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised Janury 2025 4-28

Page 443 of 1440 ends

Revised January 2025 4-29

4.2.6 Residential Mixed Use (Res-MU)
The Res-MU zone is intended to allow a mix of housing with commercial and office uses. The zone allows high density housing at 20 – 40 dwelling units per acre (du/ac). Stand-alone residential uses are allowed. Commercial, retail, and office uses are intended to encourage a mix of uses to serve the needs of local residents, employees, and visitors. Projects are encouraged to provide a mix of pedestrianoriented housing and commercial uses. For mixed-use projects with residential uses, at least fifty percent (50%) of the floor area must be residential uses. The land use is located in portions of Planning Areas 9, 12, 14, 15, 16a, and 19a. Res-MU areas total 94 acres with a target density of 24 dwelling units per acre with a target of 2,176 dwelling units.

Permitted Uses
Residential

1. Multiple-family dwellings, including Senior Housing

2. Live/Work Units

3. Residential Care Facilities (both small and large)

4. Assisted Living Facilities (both small and large)

5. Dwelling Unit, Second (ADUs)

6. Transitional and Supportive Housing

7. Single Room Occupancy Uses
Hospitality

1. Hotel, Motel

2. Bed and Breakfast
Cultural and Religious

1. Religious Institution

2. Museum or Public Library
Eating/Drinking

1. Restaurants, cafes, coffee shops, and other specialized food and beverage service establishments
Governmental/Educational

1. School – Private Day Care

2. Day Care

3. Municipal Uses including Fire or Police stations

4. Senior Center
Entertainment

1. Arcade, Game

2. Theaters, including Movie Theater

Page 444 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised Janury 2025 4-30

3. Park, public / private

4. Recreational Facility / Health Club
General Commercial

1. Art Galleries

2. Book Stores

3. Convenience Store

4. General and Specialized Retail

5. Grocery Store

6. Newsstands
Service Commercial

1. Banks and Savings and Loan Institutions

2. Financial, Brokerage Offices, Credit Union, Loan Agencies

3. General: Computer repair, Locksmith Shop, Plumbing Shops

4. Mail, Shipping, Packaging Services

5. Medical Offices and Retail including medical, optical, dental, prescription pharmacies, and mental health services

6. Offices, Administrative, Business, Medical and Professional Offices

7. Personal Services: Dry Cleaning, Laundry, Hair / Nail Salon, Day Spa, Tailor Shops

8. Pet Care (Small Animals): Boarding, Grooming, Veterinary Services Other
Any other general or specialized residential or retail or other use not specifically identified as a conditionally permitted use, deemed compatible with other permitted uses by the Development Services Director or his / her designee.

Accessory and Temporary Permitted Uses

1. Automatic Teller Machines (ATMs)

2. Christmas Tree, Pumpkin Sales / Similar Seasonal Sales / Outdoor Events*

3. Construction Trailers and Containers (Temporary)

4. Home occupations in accordance with City of Colton development code

5. Monument signage and walls consistent with the Specific Plan design guidelines herein

6. Outdoor dining in rights of way directly adjacent and accessory to an approved restaurant use.

7. Outdoor Events, in accordance with City of Colton Special Events Permit requirements

8. Parking Lots

9. Patios and patio covers

10. Private park and recreation facilities, community center buildings

11. Private parks and clubhouse buildings

Page 445 of 1440 ends

Revised January 2025 4-31

12. Satellite dishes and / or antennas shall be permitted pursuant to the City of Colton development code.

13. Swimming pools, spas, sports courts, and other similar outdoor recreational facilities

14. Temporary uses such as model homes, sales offices, and subdivision sales trailers, temporary construction offices and facilities, and real estate signs.

15. Utility buildings, structures, and facilities related to the provision of public services such as electricity, sewer, water, and telephone. Cell towers are subject to approval from the City of Colton Planning Commission

16. Utility Facilities

17. Wireless Telecommunication Facilities that are camouflaged or fully integrated into the architecture of structures

18. Other accessory uses as determined by the Planning Commission to be substantially compatible with principal permitted uses
Conditionally Permitted Uses

1. Amphitheater

2. Car Wash

3. Conference Center

4. Drinking Establishments that serve alcoholic beverages

5. Educational Institution

6. Equipment Rental (Indoor Only)

7. Liquor Stores or Grocery Stores that sell alcohol

8. Lodge or Private Club

9. New or Used Automobile Sales, Leasing and Rental (Indoor Only)

10. Night Clubs (Alcoholic beverages allowed)

11. Parking Structures

12. Performing Arts Center

13. Restaurants and Cafes with Entertainment and / or Dancing (Alcoholic beverages allowed)

14. Vehicle Repair (Indoor Only)

15. Other conditionally permitted uses as determined by the Planning Commission to be substantially compatible with principal permitted uses * Refer to Colton Municipal Code for additional standards.

Development Regulations
Refer also to Table 4-D for development regulations and standards. Objective design standards are provided in Chapter 6.

Page 446 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised Janury 2025 4-32
Lot Requirements*

1. Minimum Lot Size: Two thousand square feet (2,000’)

2. Minimum Lot Width: Twenty-five feet (25’)

3. Minimum Lot Depth: Fifty feet (50’)

4. Maximum Lot Coverage: 80%
FAR and Density Standards

1. Floor Area Ratio (FAR) Up to 2.0 FAR maximum (all uses)

2. Allowed Residential Density 20 – 40 dwelling units per acre Maximum Block Size
Large sites greater than five (5) acres shall be subdivided to create blocks. Block perimeters shall have a maximum of fourteen hundred feet (1,400’), as measured around the combination of each block face along the primary or secondary street alley. The maximum dimension of each block face shall be no more than four hundred fifty feet (450’).

Maximum Building Height
Buildings and other structures shall not exceed sixty feet (60’) in height. Buildings exceeding that height are subject to a major variance.

Special architectural features such as towers, cupolas, chimneys, and other architectural projections may exceed the maximum building height by ten feet (10’). Taller features are permitted for prominent architectural features subject to the approval by the City of Colton’s Development Services Director.

Minimum Open Space and Landscape
All Res-MU residential developments shall provide private open space and common open space as follows.

Page 447 of 1440 ends

Revised January 2025 4-33

1. Private Open Space. Private open space shall be provided for each unit as follows. Private open space may be provided in the form of patios, porches, balconies, or recessed areas open on at least one side. a. A minimum of one hundred (100) square feet of private open space per unit, with a minimum dimension of ten feet (10’) on the ground floor.
b. A minimum of fifty (50) square feet of private open space shall be provided for every four (4) units on any floors above the ground floor.
c. For SROs, Senior Housing, Residential Care Facilities, and Transitional and Support Housing uses, up to fifty percent (50%) of the required private open space can be provided through as common residential open space.
d. Subject to approval by the Development Services Director, common open space may be substituted for private open space at a ratio of 1.5:1.
i. For example, one hundred fifty (150) square feet of
improved common open space per unit may be substituted
for the one hundred (100) square feet of required provided open space. For example, seventy five (75) square feet of common open space per unit can be substituted for fifty (50) square feet of private open space.

2. Common Open Space. Common residential open space shall be provided at a minimum of twenty-five (25) square feet per unit. Common residential open space areas shall have a minimum dimension of ten feet (10’).

Common areas on building rooftops that are furnished with recreational amenities, landscaping, and shade structures can satisfy up to fifty percent (50%) of the common residential open space requirement. a. Shared Common Open Space. When common open space is
designed for shared public / private use, the minimum
requirement for common residential open space shall be reduced to twenty (20) square feet per unit. These common residential open space areas may be provided in the form of pools, playgrounds, recreation fields, or recreation buildings, but no less than fifty percent (50%) of the common residential open space area shall be outdoor, landscaped common residential open space.

3. Sidewalk connections shall be provided from homes to public sidewalks, and between homes and residential open space.

4. All landscape areas shall conform to the Community Design Guidelines and Plant Palette that are located in Section 6.0 of this document.

Parking and Circulation

1. Except as specified in these development regulations, parking in the CHCCSP project area shall be pursuant to the City of Colton Zoning Ordinance, Title 18 of the Municipal Code.

Page 448 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised Janury 2025 4-34
The following parking shall be provided for residential uses:
 One (1) space for studio or 1-bedroom units.
 One and a half (1.5) spaces for 2+ bedroom units.
 Guest parking at a rate of one (1) space for each six (6) units. Public or private on-street parking may be counted toward guest requirements.

The following parking shall be provided for commercial uses:

1. One (1) space per 500 square feet of commercial space.

2. Parking requirements may be met on local interior streets. Parallel parking stall dimensions shall be a minimum eight feet (8’) by twenty-two feet (22’).

The first stall measured from a curb return shall be no less than seven feet (7’) from the tangent (beginning point of curb radius).

3. A parking demand study prepared by a traffic engineer shall be provided to support any change in the parking requirements above and shall require approval by the Planning Commission.

4. The Development Services Director or his / her designee shall have the authority to grant the joint use of parking facilities for two or more uses without the need for a variance. Joint or reciprocal use of parking facilities may only occur when the uses / parties sharing the parking demonstrate that there is not a significant overlap in demand, and that the total number of spaces is sufficient to meet the peak parking demand of any combination of simultaneous uses.

5. A reduction in the required number of parking spaces may be permitted upon site approval by the Planning Commission without the need for a variance whenever, in the opinion of the Planning Commission, a retail use is designed to encourage and facilitate the internal circulation of public transit vehicles and the on-site, convenient, and safe loading and unloading of passengers.
a. Examples include but are not limited to: Omnitrans or other public transit with bus stops adjacent to or on-site; community tram / transit system; park and ride facilities; or facilities with disincentives to individual vehicle use; facilities with incentives encouraging other modes of transportation.

6. Driveway aisle widths shall be in conformance with the City of Colton Zoning Ordinance, Title 18 of the Municipal Code.

7. Vehicular access from the retail site in Planning Area 16 to N. Eucalyptus Avenue shall be provided. Access may be through private streets or aisles.

Assurances satisfactory to the City Engineer from the applicant will be required to ensure such access remains permanent.

8. Parking Stalls: Whenever the computation of the number of off-street parking spaces required by this section results in a fractional parking space, one (1) additional space shall be required for one-half (0.5) or more fractional parking space and any fractional space less than one-half (0.5) of a parking space shall not be counted.

Page 449 of 1440 ends

Revised January 2025 4-35

9. Parking stalls perpendicular to the curb shall be 9 feet (9’) by 19 feet (19’) except for handicap(accessible) spaces which shall meet ADA and City requirements.

Walls and Fences

1. All walls and fences shall be designed to be consistent with the CHCCSP Community Design Guidelines set forth in Section 6.0. No wood fences are permitted within the CHCCSP project area, except for use as access gates in residential areas.

2. Walls and fences constructed on interior lot lines or at the rear of the required landscape setback areas shall not exceed six feet (6’) in height unless required by an acoustical study. Walls and fences constructed on perimeter lot lines shall not exceed six feet (6’) in height.

3. All privacy walls greater than three feet (3’) in height between two buildings facing a street shall be located behind the front of the structure by a minimum of four feet (4’).

4. All service, refuse, and storage areas shall be screened with a decorative block wall in conformance with the Community Design Guidelines.

5. All types of barbed or razor wire are prohibited. Chain link fencing is only allowed as a temporary use during construction for security purposes. A time limit for temporary use shall be determined by the Development Services Director or his / her designee.

Lighting

1. Exterior lighting layout plans for parking and other site areas are required at the Site Plan Review stage that identifies the preliminary layout and type of fixture and pole. If deemed appropriate, a plan that identifies the lighting foot-candles for any given area may be requested by the Development Services Director or his / her designee. Refer to Section 6.0, Community Design Guidelines, for additional lighting standards.

2. Lighting fixtures shall be properly shielded to prevent off-site glare. Spot fixtures shall be directed downward and / or upward, but not outward from the project area. Refer also to the Community Design Guidelines.

Mechanical Equipment
All mechanical / electrical equipment such as, but not limited to, air conditioning, heating, ventilating ducts and exhaust, and aboveground electrical equipment shall be screened. Screening shall be provided as an integral aspect of the building design. Screening shall be provided with landscape and / or decorative walls.

Landscape

1. All areas of the site not occupied by buildings, parking, service and storage areas, or otherwise utilized shall be fully landscaped in conformance with the Community Design Guidelines, Section 6.0, and as described below.

2. Any landscaped area shall be separated from an adjacent vehicular area by a wall or curb at least six inches (6”) higher than the adjacent vehicular area.

Page 450 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised Janury 2025 4-36

3. All service, refuse, and storage area walls visible to the public shall be screened with plant materials. Vines shall also be required and shall not exceed seven feet (7’) on center spacing along required screen walls, minimum five (5) gallon size within minimum eighteen inch (18”) wide planting areas.

4. Parking area landscape requirements as follows. The intent of providing landscaping in parking areas is to offer relief to the monotony of rows of parked cars and to create an attractive overhead shade canopy. Parking lot trees are required to be located a maximum of every four (4) stalls on average (approximately every thirty-six feet [36’]) in cases where face-toface parking stalls occur. Planting “pockets” within the parking lots shall be a minimum four feet (4’) by four feet (4’) clear and may be oriented on a diagonal. At ends of parking rows, landscaped “islands” a minimum of six feet (6’) wide are required for the length of the parking stalls.

5. Along the perimeter of the site within building and parking setback areas, a minimum of one (1) tree per twenty five (25) linear feet of planting area is required. Trees may be grouped or spaced evenly.

6. All trees shall be fifteen (15) gallon minimum size. A minimum of twenty percent (20%) of all trees shall be twenty-four inch (24”) box size and a minimum of five percent (5%) of all trees shall be thirty-six inch (36”) box size. These shall be in addition to those trees planted within the parking lot “islands” and planting “pockets,” which shall be a minimum twenty-four inch (24”) box size. Selected trees in parking lots shall be ones that at maturity form a shade canopy. If palm trees are provided in parking lots, they shall be feather and not fan palms, which provide a greater shade canopy.

7. Screening of parking lots adjacent to street rights-of-ways is required.

Along the perimeter of all parking lots facing a public street or open space, the intent is to provide screening for the first three feet (3’) above the highest point that exists on either the street right-of-way or parking lot. A hedge, berm, decorative masonry wall, or combination of any two may be provided. If a hedge is provided, it shall be a continuous row of plants, five (5) gallon minimum size, equally spaced not to exceed three and one-half feet (3.5’) on center. Hedges should be set back from curbs to allow overhangs of parked cars. If a berm is provided, it shall not exceed a maximum of 3:1 grade on either side of the berm.

Page 451 of 1440 ends

Revised January 2025 4-37
TABLE 4-D DEVELOPMENT REGULATIONS AND STANDARDS
RES-MU
Lot Requirements:
 Minimum Parcel Size 2,000 s.f.
 Minimum Parcel Width 25ʹ
 Minimum Parcel Depth 50ʹ
FAR/Density Standards
 Floor Area Ratio (FAR) Up to 2.0 maximum
 Minimum Residential Density 20 du/acre
 Maximum Residential Density 40 du/acre
 Minimum Residential Floor Area 50% in Mixed Use Projects Minimum Setbacks (From ultimate R.O.W. or PL)
Front Building Setbacks:
 From Valley Blvd. and San Bernardino Ave. 15ʹ
 From Local Roads (Wildrose Ave, Street A,
N. Eucalyptus Ave.)
4ʹ
Side Building Setbacks
 From Valley Blvd. and San Bernardino Ave. 15ʹ
 From Local Roads (Wildrose Ave, Street A,
N. Eucalyptus Ave.)
4ʹ
 Interior Lots 0ʹ
Maximum Front or Street Side Setback (From
ultimate R.O.W. or PL)
Minimum setback + 15ʹ, except that up to 40% of the
lot frontage beyond the minimum setback shall be
occupied by usable open space
Rear Building Setbacks
 Interior Property Line or Alley 10ʹ
Minimum Sidewalk Width 10ʹ from the back of the landscaped parkway or 17ʹ from the back of the curb, whichever is greater
Good Neighbor Minimum Setbacks
 Where the side of a lot abuts the R1, R2, or
Res-M1 zone
10ʹ
 Where the rear of a lot abuts the R1, R2, or
Res-M zone
15ʹ
 Portions of any building over 35’ that abut
the R1, R2, or Res-M zone
20ʹ
Ground Floor Transparency
 For ground floor uses that are non-residential 65%
 For ground floor uses that are residential 40%
Lot Coverage:
 Maximum Coverage 80%
Maximum Building Height:
 Primary Structures 60’
 Accessory Structures 10ʹ below building height of primary structure but not less than 15ʹ
Maximum Block Perimeter 1,400 feet
Walls and Fences:
 Maximum height in building setback area 3ʹ
 Maximum height other locations 6ʹ
Parking:
 Minimum Resident Parking 1 space for studio and 1-bedroom units;

1.5 spaces for 2+ bedroom units
 Minimum Guest Parking 1 space for each 6 units. Public or private on-street parking may be counted toward guest requirements.
 Minimum Commercial Parking 1 space per 500 square feet

Page 452 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised Janury 2025 4-38
Notes to Tables 4-D:

1. All building setbacks are measured from the street rights-of-way shown in street sections or from the ultimate property line.

2. Setbacks along private streets shall be measured from back of sidewalk. If no sidewalk, then from face of curb.

3. Minimum parcel widths shall be measured at the front setback line.

4. Architectural projections may project a maximum of three feet (3’) into required front, rear, or side setback areas; however, in all cases, there shall be a minimum clearance of four feet (4’) to an opposing projection, including a building, wall, or fence. An architectural projection is defined as an element that articulates the building elevation such as eaves, window and door pop out surrounds, media niches, bay windows, pot shelves, chimneys, enhanced window sills, shutter details, window trim, and other similar elements.

5. Balconies, open covered porches, patio walls, and gates are permitted to project into the setbacks as indicated in the development regulations or as otherwise specified in this document.

6. The minimum depth of an open covered porch shall be five feet (5’). Clearance between opposing porches or balconies shall be fifteen feet (15’) in front-to-front building orientations, and ten feet (10’) in other conditions.

7. Side yard slopes of 2:1 or greater shall not encroach more than fifty percent (50%) into yard setback areas.

8. Shared use easements are permitted.

9. Recreational vehicle (RV) parking is prohibited for more than seventy-two (72) hours on residential streets.

10. Buildings three (3) stories or greater shall be subject to City of Colton Fire Department approval.

11. Building articulation is required on rear building elevations along alleyways.

12. Along a side yard adjacent to an alley, there shall be a minimum of two feet (2’) of planting area where a wall or fence is adjacent to an alley curb or sidewalk, whichever is closer to the wall or fence.

13. Wall and Fence measurements: The height of a wall or fence shall be measured from the highest ground level on either side of the wall or fence. In order to allow for variation in topography, the height of a wall or fence may vary in an amount not to exceed eight inches (8”) provided that in no event shall the average height of the wall or fence exceed the maximum height permitted.

Page 453 of 1440 ends

Revised January 2025 4-39

4.3 Open Space/Parks (OS/P) and Open
Space Habitat (OS/H)
These land use categories include uses in Planning Areas 3, 6, 11, 12, 13, 14 and 18.

Park uses and design, including all recreational amenities to be included in PA’s 12, 13 and 14, are subject to review and approval of the City Development Services Director and/or his/her designees.

Any use of the Open Space / Habitat areas in PA 3, 6, 11 and 18, other than as a preserved habitat, shall be subject to review and approval by the Development Services Director in consultation with the appropriate public agencies having jurisdiction.

4.4 Sign Regulations
Comprehensive Sign Program
A comprehensive sign program will assure that signs for all land uses within the Colton’s Hub City Centre Specific Plan Amendment (CHCCSP) area are integrated into the overall community vision and theme.

Purpose and Intent
Signage is an important design element of the physical environment and an important aspect of business communication. As a planned architectural feature, a sign can be attractive and harmonize with the physical character of its environment.

The purpose and intent of the sign regulations for the CHCCSP are the same as those identified in the current City Sign Ordinance (Title 18, Chapter 1850).

1. Promote an economically stable and visually attractive community and ensure that the special character and image the City is striving for can be attained.

2. Promote signs and graphics that are attractive, pleasing and harmonized with the physical character of the environment and surrounding properties, while serving the advertising needs of the business community;

3. Promote traffic safety and the smooth and efficient flow of pedestrians and vehicles to their destinations;

4. Direct persons to various activities and enterprises, in order to provide for maximum public convenience.

Authority and Requirements
The sign standards that follow shall apply to all properties located within the CHCCSP project area. The City of Colton Zoning Ordinance, Title 18, Chapter 1850, of the Municipal Code, shall prevail for this section, except as otherwise indicated in the standards that follow. The changes that have been incorporated and modify the current City Ordinance are based on tailoring the signage needs to the CHCCSP area, which as a large master planned mixed use community has

Page 454 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised January 2025 4-40
certain unique signage requirements. If there is a discrepancy between the City Zoning Ordinance and the CHCCSP, then the CHCCSP shall take precedence.

A sign permit shall be obtained from the City prior to the construction or installation of all permanent and temporary signs within the CHCCSP project area.

Design Standards for Signage
The design standards set forth in this section shall be adhered to for all signage within The CHCCSP Specific Plan.

Community Monument Signs
Community monument signs as described in Section 6.0 and illustrated in Figures 6-35 through 6-37 establish the community identity at the primary entries into the CHCCSP area and shall be designed and constructed to meet the intent as shown.

They shall be constructed by the developer for each respective planning area in which they occur. Other than within apartment sites, no additional monument signs are permitted within residential planning areas. Additional monument signs are permitted within commercial parcels.

Commercial Parcel Area Signs
Within commercial (non-residential) areas, additional monument signs are permitted for identification of different office, business and retail centers. It is in the interest of both aesthetics and traffic safety that sign information is kept to a minimum. Only the name of the businesses and / or the name of the shopping center shall appear on the sign. The use of subordinate information such as telephone numbers, lists of products, pictures of products, etc., is not permitted.

Example of 20’ tall sign with shopping center, business / merchant names only.

Each sign shall be designed with the intent and purpose of relating to the architectural style of the main building or buildings within each Planning Area.

The sign shall also be compatible with the style or character of signage and development in adjacent planning areas if said signage was approved following adoption of the CHCCSP. Signs located within non-residential planning areas but adjacent to pre- dominantly residential areas shall consider compatibility with such residential area.

Where there is more than one monument sign located within any Planning Area, all such signs shall follow the uniform design standards described in the City Zoning Ordinance, Chapter 18.50, and shall have designs which are well related to each other by the similar treatment including the following six design elements:

Page 455 of 1440 ends

Revised January 2025 4-41

1. Type of construction materials as used in the several sign components, such as cabinet, sign copy, supports.

2. Letter style of sign copy.

3. Illumination.

4. Type or method used for supports, uprights or structure on which sign is supported.

5. Sign cabinet or other configuration of sign area.

6. Shape of entire sign and its several components.

Each monument sign shall be located in a planted, landscaped area which is of a shape, design and size that will provide a compatible setting and ground definition to the sign, as determined by the Development Services Director or his / her designee. The planted landscaped area shall be maintained on a reasonable and regular basis. Monument signs shall be nonmoving stationary structures. In all components and illumination (if any) shall be maintained by artificial light (either internally or externally) which is stationary and constant in intensity and color at all times (nonflashing).

All retail, office, and business park uses shall be considered non-residential property as relates to the City Sign Code.

A uniform sign program for all new multi-tenant developments of three or more separate tenants is required for all Retail, Office, and Business Park uses and for residential Planning Areas 25, 26 and 27 within high density uses.

The maximum height of a free standing monument for business park or office uses shall be six feet high (6’) and eight feet (8’) wide. For retail uses less than twenty (20) acres in size, the maximum height shall be six feet (6’) high and twelve feet (12’) wide.

For retail uses twenty (20) acres or greater, the maximum monument sign height shall be twenty feet (20’) high and fifteen feet (15’) wide, similar to dimensions of the sign in the example above on the previous page.

Pylon / freeway signs shall be permitted to exceed fifty feet (50’) in height if approved by the City Planning Commission.

Temporary Community Marketing Signs
For the residential areas, temporary signs for sales and marketing of the master planned community should be provided in a comprehensive sign program.

Signage along perimeter and interior streets that identify the community and each of the new developments, including directional signs and other types of community information shall be submitted for review and approval by the Development Services Director. The duration of the use of the signs shall also be determined by the Development Services Director.

Temporary Real Estate Signs for Residential Parcels
Temporary real estate signs advertising real property of ten (10) or more dwellings which has been subdivided for the purposes of sale or lease, shall be subject to the following conditions:

Page 456 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised January 2025 4-42

1. The sign shall remain only as long as some portion of the property advertised for sale remains unsold, or for a period of two (2) years from the recordation of the final map, whichever period is shorter. Subject to review and approval by the Planning Commission, such time may be extended for one year, provided that there is still a bona fide offering of lots in the subdivision for sale. Not more than one (1) such extension may be granted.

2. The signs shall be located on the premises that they advertise.

3. No sign shall exceed thirty-two (32) square feet in area. No one dimension shall exceed feet (8’) for the sign.

4. Not more than one (1) advertising sign that shall be permitted in any subdivision. Additional signs for parking area identification, model home unit identification, (one (1) per model), and other model home information shall not exceed four (4) square feet per sign or a maximum single dimension of two (2) feet.

5. Temporary banners, flags and pennants may be used for advertising the sale or lease of the tract, subdivisions or development and models therein, in compliance with standards of the City Sign Ordinance, Chapter 1850.

6. No signs shall be posted in the public right-of-way. Any sign(s) so posted shall be subject to removal with removal fees to be billed to persons benefiting from sign(s).

7. No lighted or luminous sign shall be so constructed, erected or placed so as to direct or reflect artificial light onto any structure used exclusively for residential purposes.

Temporary Off-Site (Kiosk)
All temporary off-site signs shall be provided in conjunction with a uniform sign program as administered by a company that provides off-site signage and is approved by the City pursuant to the City Zoning Ordinance Section 18.50.120.

Wall Murals
Wall murals may be permitted in any retail planning area subject to the following conditions:

1. Wall murals shall be installed directly on a building wall.

2. There shall be no projection of the wall mural in any direction from the surface of the structure exceeding three (3) inches, except for a frame around the mural.

3. The property owner shall give his written consent to erect and further shall agree to properly maintain and remove that mural in accordance with conditions established by the Planning Commission.

4. Wall murals shall be approved by the Planning Commission subject to:
a. Conceptual compatibility of the design with the immediate environment of the site.
b. Appropriateness of the design and size to the function of the site. c. Compatibility of the design and location within a unified design theme.

Page 457 of 1440 ends

Revised January 2025 4-43
d. Appropriateness of the design as a public work of art. The design may portray, but not be limited to, a cultural, historical or scenic subject.

The Planning Commission shall establish a maximum time period for the existence of a wall mural. The Planning Commission may establish such further conditions, as it deems appropriate upon approval of an application for a wall mural. All applications for murals as specified shall be made on a scale rendering and / or scale model.

Page 458 of 1440 ends

4.0 │ DEVELOPMENT REGULATIONS
Revised January 2025 4-44
This page intentionally left blank.

Page 459 of 1440 ends

Revised January 2025 5-1
SECTION 5

CIRCULATION, PUBLIC FACILITIES AND SERVICES

5.0 Circulation, Public Facilities and
Services

5.1 Circulation Plan
A major road network is already in place for the Colton’s Hub City Centre Specific Plan Amendment (CHCCSP) project area, providing excellent north / south and east / west vehicular circulation routes. A full interchange also exists at Pepper Avenue and the I-10 Freeway. Road and bridge improvements at the interchange are scheduled to occur in 2014. Based upon a comprehensive traffic study prepared for the CHCCSP project area, the required future road sections and rights-of-way were developed. Refer to the Circulation Plan, Figure 5-1 and corresponding road sections in Figure 5-2. Existing and planned road widths are summarized below.

New road improvements or existing roads that require widening or other improvements shall be a condition of development subject to approval by the City engineer and Development Director.

Pepper Avenue
Pepper Avenue is designated as a Major Arterial. It is currently a major north / south 6-lane divided thoroughfare with a full interchange at the I-10 Freeway.

Most of Pepper Avenue has been fully improved and includes a 17 foot wide raised median. See Figure 5-1 and Street Section A on Figure 5-2. The interchange is planned for major improvements in 2014.

The primary change will be to provide a seven foot wide landscaped parkway on the west side of the road with an eight foot wide combination sidewalk and Class I bike lane. The additional right-of-way and improvements will occur as a condition of future development.

Valley Boulevard
Valley Boulevard is designated as a Major Arterial. It is currently a four lane road and will be increased to six lanes and include a raised median. See Figure 5-1 and street section A on Figure 5-2.

San Bernardino Avenue
San Bernardino Avenue is designated as a Collector Street. It is currently a four lane road and will remain in that configuration. See Figure 5-1 and Street Section B on Figure 5-2.

Page 460 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-2
The street width and right-of-way may be expanded approximately 10 feet on the south side of the road in the future to accommodate an Omnitrans Bus Rapid transit line, should that become a reality. See Figure 5-1 and Street Section B on Figure 5-2.

Meridian Avenue
Meridian Avenue is an existing 2-lane local road and will be improved to 4 lanes.

See Figure 5-1 and Street Section B on Figure 5-2.

Wildrose Avenue (North Of Street A), Woodpine Avenue,
Indigo Avenue, Hermosa Avenue, Street A and C Street
Wildrose Avenue, Woodpine Avenue, Indigo Avenue, and C Street are existing 2- lane roads and will remain so. While Wildrose currently extends between Valley Boulevard and San Bernardino Avenue, it will be changed to a cul-de-sac on its north end to avoid through traffic in residential areas. Street A is a new 2-lane road located between Wildrose Avenue and N. Eucalyptus Avenue and is also designated as a 2-lane road.

Wildrose Avenue and Woodpine Avenue will have a 36’ curb to curb street section within a 72’ right of way. Wildrose Avenue between Woodpine Avenue and Valley Blvd will have a 48’ curb to curb street section within a 72’ right-of-way.

Woodpine Avenue and Indigo Avenue will have a 48’ curb to curb street section within a 64’right-of-way.

Wildrose Avenue (South Of Street A) and N. Eucalyptus Avenue Wildrose Avenue (south of Street A) is an existing 2-lane road. N. Eucalyptus Avenue is a new road and an extension of N. Eucalyptus Avenue north of San Bernardino Avenue. Both are planned as 2-lane roads with a 40’ curb to curb street section within a 64’ right-of-way.

Bus Rapid Transit
Based on discussions with representatives of Omnitrans, they are estimating that within the next 5 to 10 years a bus rapid transit (BRT) system will be in place to serve the CHCCSP project area and surrounding communities. The current Omnitrans plans establish a BRT beginning point for the CHCCSP project area along Valley Boulevard at Hermosa Avenue, north on Pepper Avenue, and an end point at the western boundary of the project area along San Bernardino Avenue.

The bus line would continue westerly from that point.

Page 461 of 1440 ends

Revised January 2025 5-3
Figure 5-1 Circulation Plan
LEGEND Major Arterial - 6 lanes divided
Secondary Arterial - 4 lanes
Local Street - 2 lanes
BRT - Holt Line

Page 462 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-4
Note: Pursuant to CHCCSP
Amendment No. 1 Wildrose Village
Figure 5-2 Street Sections

Page 463 of 1440 ends

Revised January 2025 5-5
Because there is no certainty that continuity of the exclusive bus lanes can be provided outside of the specific plan area, instead of exclusive BRT lanes, “queue jumper” lanes and bus priority signalization at major intersections are planned for in the CHCCSP area. These improvements are part of Omnitrans’ Bus Stop Guidelines (2006). Where applicable, all applications for development adjacent to the proposed BRT route shall be subject to review by the Development Services Director to assure queue jumper lanes and bus priority signalization at major intersections can be provided.

Pedestrian Connectivity/Bicycle Routes
One of the primary goals identified for the CHCCSP area is to create a safe, walkable community that connects the residential neighborhoods to one other, as well as to the parks, school, new commercial uses and the surrounding community.

Figure 5-3, Bike Lane and Sidewalk Master Plan, identifies the routes for both pedestrian and bicyclists. To enhance safety, all pedestrian walks along interior residential neighborhood public streets are separated from the street by a landscape parkway. Provisions in the development Regulations and Community Design Guidelines have been provided to ensure that pedestrian connectivity is provided to interconnect all land uses.

5.2 Infrastructure: Grading, Sewer, Water, Storm
Drainage, Utilities

5.2.1 Overview
The following describes the various infrastructure master plans to support the land uses for Colton’s Hub City Center Specific Plan (CHCCSP) including grading, sewer, storm drainage and water. Utilities including electric, telephone, gas and cable television are also discussed. Proposed drainage, sewer, and water master plans have been conceptually designed to provide an adequate level of service for the maximum level of the planned development. These master plans are based on various city infrastructure studies.

5.2.2 Master Grading Plan
The existing topography on the project site is split with a high point at San Bernardino Avenue at Eucalyptus Avenue. Overall the average grades across the site vary from 0.5% to 1.5%. The portion of the site lying westerly of Eucalyptus Avenue drains south and westerly towards Valley Boulevard and the portion of the site lying easterly of Eucalyptus Avenue drains south and easterly towards Valley Boulevard and Meridian Avenue. Portions of the existing golf course currently lie about 7 feet below the grade of Valley Boulevard. As a result, portions of the site will require significant grading. All grading shall be done under the jurisdiction of the latest edition of the CBC, and the City of Colton Building and Safety and Engineering Divisions. The Grading Plan has been designed to accommodate drainage and a street system that meets city standards for acceptable infrastructure grades. The conceptual Master Grading Plan is shown on Figure 5-4.

Page 464 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-6
Note: Pursuant to CHCCSP
Amendment No. 1 Wildrose Village Refer to Figure 5-1 for street locations.

Figure 5-3. Bike Lane and Sidewalk Master Plan

Page 465 of 1440 ends

Revised January 2025 5-7
In most areas, the proposed grades will be within 1 to 7 feet of the existing ground surface. This may increase in the business park, where larger pads are typically needed. The earthwork of each individual development is expected to balance with the exception of Planning Areas 9, 13 and 16 (existing golf course and park sites). Planning Areas 9, 13 and 16 are expected to have significant amounts of import, estimated import quantities are shown on the Conceptual Master Grading Plan. A more detailed analysis of the grading plan will be required as part of the final project design. The grading and earthwork volumes will then be refined to meet the requirements of the City of Colton based on the proposed land use.

5.2.3 Master Sewer Plan
The City of Colton owns, operates and maintains a wastewater collection, pumping and treatment system and will be providing the wastewater collection for the proposed CHCCSP area. The city is responsible for the construction and on-going maintenance of the wastewater collection system within the city limits.

The conceptual Master Sewer Plan shown in Figure 5-5 depicts the existing and proposed location and sizes of the wastewater collection system within the CHCCSP area. At the present time there is an existing 12-inch sewer main in Valley Blvd., west of Pepper, and a 15-inch sewer main within Valley Blvd., east of Pepper Avenue. In addition, there is an existing 12-inch main running north-south in Wildrose Avenue, an existing 8-inch main running east-west on Woodpine Avenue and north-south on Indigo Avenue, an existing 12-inch sewer line running north-south along the existing Eucalyptus Avenue right-of-way, an existing 8-inch sewer line running north-south along Pepper Avenue as well as an existing 8-inch sewer line running north-south in Meridian Avenue which transitions to a 10-inch line near Valley Blvd.

The proposed sewer system consists of a new 8-inch sewer pipe in N Eucalyptus Ave. running southerly to Street “A”, the 8-inch sewer continues on Street “A” connecting to the existing 12-inch sewer on Wildrose Ave. The existing 12” sewer located in Valley Blvd. from Wildrose Avenue to Pepper Avenue will be abandoned or removed and replaced with a new 15 inch sewer pipe. A new 10- inch sewer pipe is proposed within Hermosa Avenue, running northerly from Valley Blvd. All proposed sewer pipes within the CHCCSP area are designed to fall within the proposed dedicated street rights-of-way; no additional rights-ofway are required to provide sewage collection within the CHCCSP area.

A more detailed analysis of the size and location of the wastewater collection system will be required as part of the final design. The sewer pipe size will then be refined to meet the requirements of the City of Colton based on the proposed land use.

5.2.4 Master Water Plan
The City of Colton and West Valley Water District currently provide water service for the CHCCSP area. The City of Colton currently provides water service to the area east of Pepper Avenue and West Valley Water District currently provides water service to the area west of Pepper Avenue. The conceptual Master Water

Page 466 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-8
Plan on Figure 5-7 depicts the existing and proposed location and sizes of the water distribution system within the CHCCSP area.

The portion of the project served by West Valley Water District is in their Pressure Zone 3 system. There is a 12-inch diameter pipeline in Wildrose Ave, Woodpine Ave, Indigo Ave and San Bernardino Ave, between Wildrose Ave and Eucalyptus Ave. There is an 8-inch diameter pipeline in San Bernardino Ave, between Eucalyptus Ave and Pepper Ave., there is also a 10-inch diameter pipeline in Pepper Ave and Valley Ave between Eucalyptus Ave and Pepper Ave. as well as an 8-inch diameter pipeline in Rexford Avenue.

The proposed water distribution system consists of abandoning the existing 16- inch water line in Eucalyptus Avenue and constructing a new 16-inch water line in the new Eucalyptus Avenue right-of-way. Also proposed is a new 8-inch water line in Street “A”. All proposed water lines within the CHCCSP area are designed to fall within the proposed dedicated street rights-of-way; no additional rights-ofway are required to provide water distribution within the CHCCSP area.

West Valley Water District’s existing storage capacity for Pressure Zone 3 is 9 million gallons. Preliminary calculations indicate the need for additional storage for the Zone 3 system. A Water Supply Assessment (WSA) for the Specific Plan area located within the WVWD service area, dated September 5, 2013, has been approved by the West Valley Water District Board of Directors. A WSA has also been approved by the City of Colton for its respective service area.

A more detailed analysis of the size, location and capacity of existing facilities of the water distribution system will be required as part of the final design. The water pipe size will then be refined to meet the minimum requirements of the City of Colton and WVWD based on the proposed land use.

5.2.5 Master Storm Drain
The project site is located within the boundaries of the San Bernardino County Flood Control District. That portion of the project that lies west of Eucalyptus Avenue drains south and westerly towards Valley Boulevard and Sycamore Avenue, to the Rialto Channel Drainage Area, in Master Plan Drainage Area 3-3.

That portion of the project that lies east of Eucalyptus Avenue drains south and easterly towards Valley Boulevard and Meridian Avenue to the previously constructed 108 inch storm drain pipe at Meridian and I-10 Freeway, in Master Plan Drainage Area 3-5. This existing Master Plan 108 inch storm drainpipe is bulkheaded at the I-10 Freeway. Master Storm Drain is shown on Figure 5-6.

Storm drainage master planning is a joint responsibility of the City of Colton and the San Bernardino County Flood Control District. Drainage and flood control facilities and drainage improvements shall be provided in accordance with the requirements of the San Bernardino County Flood Control District. The San Bernardino County Flood Control District is responsible for the regional channels, debris basins, and detention facilities. The city is responsible for the acceptance, maintenance, and master plan design of the local drainage collection systems, local detention basins, and the storm drain infrastructure that carry runoff to San Bernardino County Flood Control District regional facilities.

Page 467 of 1440 ends

Revised January 2025 5-9
The master planned drainage facilities are designed to carry various design flows.

The project will be required to convey safely the 100-year storm event for the developed condition. In order to minimize deficiencies in the existing drainage system, individual developments will be responsible for detaining all stormwater in excess of the sites existing peak runoff. According to the City of Colton, a 72- inch storm drain was constructed from the existing 84-inch storm drain (Colton Drain) in Valley Boulevard, at the west end of the Specific Plan boundary, to Eucalyptus Avenue continuing north on Eucalyptus Avenue as a 66-inch storm drain to the existing George Brown Park detention basin located south of San Bernardino Avenue at Eucalyptus Avenue. This storm drain extension is bulkheaded at the future connection to the existing 84-inch Colton Drain due to backwater issues caused by the Rialto Channel. The constructed length or constructed pipe sizes of this storm drain line have not been verified and would be verified before any connections are made to the storm drain.

When the ultimate 3-5 storm drain system is installed downstream to the Santa Ana River it is anticipated that the George Brown Park site will no longer be required for flood protection (refer to City of Colton Storm Drain System Update by GTS Associates). Prior to the completion of the 3-5 storm drain system the existing George Brown Park site will be required to provide interim flood protection to mitigate flooding downstream. The estimated flood volume to the George Brown Park site based on the rational method calculations in the report “Preliminary Study for Comprehensive Storm Drain Projects 3-3, 3-5, 3-8 Rational Method Volume III” prepared for the City of Colton, dated May 20, 2008, is about 24 acre-feet. The George Brown Park site currently discharges water to the 3-3 drainage basin.

A more detailed analysis of the size and location of the storm drain system will be required as part of the final design for each development application. The storm drain pipe size will then be refined to meet the requirements of the City of Colton based on the proposed land use.

5.2.6 Utilities
The electric, telephone, gas and cable television utilities providers are as follows.

Each will be connected at the most convenient existing locations and extended through the site during the phased construction of the project. a. Electrical Service
For electrical service, the CHCCSP is served by Colton Electric. Address is 150 S. 10th Street, Colton, CA 92324; (909) 370-5104.
b. Gas Service
For gas service, the CHCCSP area is served by The Gas Company. Ad- dress is 1981 W. Lugonia Avenue, Redlands, CA 92374; (909) 335-3919. c. Telephone Service
For telephone service, the CHCCSP area is served by Verizon. Address is 1400 E.

Phillips Boulevard, Pomona, CA 91766; (909) 469-6343.

Page 468 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-10
d. Cable Television Service
For cable television service, the CHCCSP area is served by Time Warner Cable, South Division; (888) TW-CABLE.

5.3 Community Services
The following information provides a summary of the community services to be provided to the CHCCSP project area.

5.3.1 Police and Fire Protection
The Colton Police Department provides law enforcement for the City and will be responsible for servicing the entire CHCCSP project area. Colton’s current standard is a ratio of one sworn police officer per 1,000 residents. The police station is located at 650 N. La Cadena Drive in Colton. Additional sworn police offices will be required to support the development at this same ratio. A sub-station will be required for the project within the future retail center within Planning Area 16 or other location deemed acceptable to the Police Department. As part of any retail development within Planning Area 16, the applicant will be required to work with the Police Department to locate such a facility to the satisfaction of the Police Department and the City Planning Commission.

The City of Colton Fire Department provides fire protection to the CHCCSP area.

They also provide paramedic service in this area. The closest station is Fire Station #212, which is approximately one mile away, located on 1511 N. Rancho Avenue, northeast of the project. The response time from Fire Station is approximately six minutes to the project area.

While no fire station is required for the CHCCSP area, the current Fire Station #212 may need to be upgraded or relocated to better serve new development in the project. Therefore, prior to approval of each application within the CHCCSP area, the applicant(s) will be required to work together with the Fire Department to address their needs. Fire sprinklers are required for all residential buildings with the exception of detached one and two-family homes, per current city requirements. One-family and two-family homes may also require fire sprinklers subject to a determination by the Planning Commission.

In the event lake features occur in the CHCCSP area, access shall be provided for fire trucks for use in case of emergencies to the satisfaction of the Fire Department.

5.3.2 Library Services
The City of Colton has two libraries to serve the CHCCSP project area. The Colton Public Library is the closest at approximately two miles, and is located at 656 N. 9th Street. The Luque Branch Library, is located at 294 East “O” Street.

5.3.3 Public Schools
The Rialto Unified School District (RUSD) serves the student population that will be generated by the residential uses within the CHCCSP.

Page 469 of 1440 ends

Revised January 2025 5-11

5.4 Capital Improvement Program
Public facility and utility infrastructure implementation and financing will be determined based on individual property owner timing and market conditions. It is envisioned that land development costs for public services e.g., sewer, water, storm drain, dry utilities, public parks and open space may be funded through a combination of the following: private developer funds, special assessment districts, Mello-Roos community facilities districts, or other sources.

5.5 Infrastructure Development Requirements
Development within the CHCCSP area is projected to occur over a ten to fifteen year time period.

The scope, timing and location of each development area will depend upon individual property owner requirements. For any project, assurances shall be provided to the City prior to occupancy that all infrastructure improvements necessary to serve that portion or phase of the project are in place. Proposed infrastructure plans for any project shall be reviewed and approved by the City Engineer and Development Services Director to ensure that sizing and design of the infrastructure complies with the infrastructure master plans and technical reports contained in the CHCCSP or within any technical Appendices. Subsequent studies and / or more detailed analysis may be required by the City Engineer if deemed necessary to ensure the health, safety and general welfare of the community.

Model homes and temporary sales offices may be permitted exempt from these conditions subject to approval of the Development Services Director.

5.5 Maintenance
Table 5.1 that follows identifies the Maintenance Responsibilities of the various components within the Specific Plan boundary.

Page 470 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-12
Table 5.1 — Maintenance Responsibilities
City and
/ or
Special
District
Private
Homeowners
Association (HOA)
or SubAssociation
Private Homeowner,
Commercial / Business
Park / Industrial
Property Owners
Utility
Entity
Master Plan Roadways (curb-to-curb, parkways,
sidewalks, street lights) Valley Boulevard,
Pepper Avenue, San Bernardino Avenue,
Hermosa Avenue, Meridian Avenue)
X
Interior Project Roads: (curb-to-curb, parkways,
sidewalks and street lights) Wildrose Avenue,
Indigo Avenue, N. Eucalyptus Avenue,
Woodpine Avenue, Street A
X
Traffic Signals X
Traffic Control Signs X
Private Alleys X
Driveways and Parking Areas Serving
Commercial / Business Park / Office / Retail
uses located in R, BP, OMU and RMU areas.

X
Off-site and on site water, sewer, and storm
drain improvements (excluding laterals) X
Parks - Private X
Parks - Public X
Private Recreation Building, Pool Areas X
Residential Front Yard Landscaping – RES M1
areas.

X
Landscaped Common Areas within individual
project boundaries. X
Community Theme and Wall and Entry
Monuments (outside face for graffiti removal) X
Alley Landscaping X
Electricity X
Natural Gas X
Communication Systems X

Page 471 of 1440 ends

Revised January 2025 5-13
Figure 5-5 Master Sewer Plan

Page 472 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-14
This page intentionally left blank

Page 473 of 1440 ends

Revised January 2025 5-15
Figure 5-6 Master Storm Drain Plan

Page 474 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-16
This page intentionally left blank

Page 475 of 1440 ends

Revised January 2025 5-17
Figure 5-7 Master Water Plan

Page 476 of 1440 ends

5.0 │ CIRCULATION, PUBLIC FACILITIES AND SERVICES
Revised January 2025 5-18
This page intentionally left blank

Page 477 of 1440 ends

Revised January 2025 6-1
SECTION 6

COMMUNITY DESIGN GUIDELINES

6.0 Community Design Guidelines and
Objective Design Standards

6.1 Purpose and Intent
The Colton’s Hub City Centre Specific Plan Amendment (CHCCSP) Community Design Guidelines provides standards and guidelines for all major community design elements: site planning, architecture, monumentation, landscape, signage, lighting and other improvements in order to implement the “Vision” and “Principles” identified in Section 2.0, Community Planning and Design Principles Additionally, the objective design standards set forth in Section 6.8 also provide standards including: site planning and building design to implement the “Vision” and “Principles” for residential mixed use development projects.

Sketches, exhibits and representative project photographs are intended as visual aids in conveying basic design intent. They are provided as a “palette” of design elements to guide the design of the various sites but are not to depict any actual lot or building design. Architects, engineers, landscape architects, developers, builders and others involved with project design of each individual parcel are encouraged to use creativity and imagination in developing their precise design proposals and to build upon these guidelines. Refer also to Section 4, Development Regulations, for each of the respective land use types.

All project applications shall be in substantial conformance with these guidelines.

As used in this section, “shall” indicates a requirement and “should” indicates a guideline that is strongly recommended and is subject to discretion by the Development Services Director or his / her designee and / or Planning Commission during the development application review process. The renderings and sketches that follow include the Specific Plan project name “Colton’s Hub City Centre”. The City Council has sole discretion to revise the project name at a future date.

Objective Design Standards set forth in Section 6.8 apply to new Res-MU development proposals within the boundary of the Specific Plan. For further discussion of applicability of the objective design standards see Section 7.3.3.

Page 478 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-2

6.2 Design Guideline Objectives and Objective
Standards
The primary objectives of these Guidelines are to:

1. Provide guidance and criteria to City staff, the Planning Commission and City Council in the review of future development applications.

2. Implement the Vision and Principles identified in Section 2.0, Community Planning and Design Principles, including the following:
¤ Establish design elements that create a village environment. ¤ Establish and encourage pedestrian connectivity among various land uses.
¤ Provide emphasis on the pedestrian and pedestrian scaled design elements.
¤ Create a community design that will add value for property owners, future residents, businesses, and the City as a whole.
¤ Implement the Housing Element programs and comply with state housing laws.

6.3 Community Identity / Village Environment
Most memorable communities with a village type environment share certain common characteristics. They are walkable, include quaint parks and beautiful tree shaded streetscapes with rich landscaping in residential and commercial / business areas. They have a distinct identity that comes through due to a combination of quality architectural and landscape design elements, including enhanced entry monumentation, street furnishings and signage. They are also pedestrian scaled: interior streets are primarily two lanes, architectural elements visible from the public domain are more highly detailed with special attention to building forms, roof lines, and entries, windows, and other elements that enrich the community. There is also a timeless quality, one that improves in character and charm over time. These types of village settings are frequently referred to as “Early California” vernacular. Examples of these settings can be found in many older communities such as Pasadena, Claremont, and Riverside.

This Early California vernacular has been selected as the guiding design influence for the CHCCSP. For residential areas, it opens the door to a wide diversity of architectural influences such as Monterey, Spanish Eclectic, Craftsman and Cottage styles, among others. Within the retail areas and particularly the Main Street elements, Early California influences provides a wide range of architectural elements, with pedestrian scaled store fronts that incorporate a rich variety of materials such as stone and brick. For the office and business parks, the village character can be achieved by providing a campus like setting, with tree shaded parkways in public streets and well landscaped project areas.

Page 479 of 1440 ends

Revised January 2025 6-3
The guidelines in this Section identify the quality and character envisioned for the CHCCSP to implement this Early California vernacular. All development proposals for the CHCCSP shall meet or exceed the quality shown.

The guidelines are organized into the following sections:
 RETAIL
 OFFICE
 BUSINESS PARK
 RESIDENTIAL
 RESIDENTIAL MIXED USE
 RESIDENTIAL SITE LANDSCAPE, WALLS, AND FENCES
 COMMUNITY STREETSCAPE MASTER PLAN
 COMMUNITY ENTRY MONUMENTS , WALLS AND FENCES
 COMMUNITY LANDSCAPE GUIDELINES
 OUTDOOR LIGHTING

6.4 Retail Guidelines
Objectives
The objective for Retail areas is to promote development of a vibrant walkable Village Center Hub that includes a “Main Street”, entertainment and hospitality components combined with large format department stores, large format national retail stores and other support uses. The many existing and planned uses near the Center will add to its vitality.

With the planned nearby office, Business Park and residential uses, there is likely to be a substantial number of people that will walk to the Retail areas. This is in addition to the potential use by many of those who are employed by or visit the ARMC. Therefore, during all phases of planning and development, a strong emphasis should be placed on creating pedestrian connectivity to the adjacent and nearby uses.

The Retail Guidelines are divided into several categories as follows:
 Main Street
 Northwest Corner of Pepper Avenue and Valley Boulevard  Large Format Buildings
 Hotel and Motels
 Service Stations and Car Washes
 Drive-through Businesses
Each of the above categories is subdivided into Site Planning / Landscape Guidelines and Architectural Guidelines below. Refer in particular to Section 4.0 Development Regulations, and to Section 7.3.4, for Master Planning requirements for all Retail (R) planning areas.

Page 480 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-4
Main Street - Site Planning / Landscape Guidelines
Main Street “lifestyle centers” typically provide specialty goods, services and restaurants with outdoor patios and dining areas in a village atmosphere, reminiscent of early California Main Streets. These lifestyle centers are typically located within a larger shopping center context. This retailing model, mixing small scale shops and restaurants along a central Main Street within a larger shopping center setting, has become more popular throughout the Inland Empire and nationwide as it combines small village scale shopping and dining with the convenience of having all major national scale retailers in one location. Since shoppers at these centers are inclined to visit more than one store, and tend to spend time browsing through several shops, retail sales are often greater.

Figure 6.1 conveys the overall concept of a Main Street for Colton’s Hub City Centre. It is set within the context of a larger shopping center. The Arrowhead Regional Medical Center, north of the I-10 Freeway and Valley Boulevard, is shown along the right portion of the rendering.

The renderings illustrate the goals for PA 16 and includes specialty shops, restaurants with outdoor seating areas, small plaza / fountain areas and thematic lighting.

The building locations in the rendering are shown for conceptual purposes. The goal is to provide future shopping center developers with an overall concept to guide future detailed plans. The following provides various considerations to be taken into account during the planning and design of the Main Street:

1. To create an attractive and vibrant pedestrian scale Main Street setting, enhance walkways in fronts of buildings with landscaping, thematic lighting fixtures, benches, trellises, and other decorative features.

Organize buildings to encourage pedestrian circulation between stores and adjacent uses. Minimum walkway widths adjacent to buildings should be 12 feet to provide ample room.

2. Provide an arch way or equivalent architectural feature at the primary entry area from Valley Boulevard and/or Pepper Avenue as shown in Figure 6-2.

3. Orient primary store entries and windows to the Main Street so they are easily identifiable and inviting as shown in Figure 6-3.

4. Provide a roundabout to create a focal point for the Main Street and include a fountain and/or other focal element such as a sculpture or specimen tree. Figure 6-4 illustrates a concept with a fountain in a roundabout.

5. Seek to incorporate a movie theater complex in any master plan concept within Planning Area 16 and orient it to the Main Street as an architectural focal point. See Figure 6-5.

6. Provide one row of parking (parallel, perpendicular or angled) on the Main Street on each side of the street. All other parking shall occur in the rear of the Main Street with pedestrian access between buildings to meet minimum parking stall requirements.

Page 481 of 1440 ends

Revised January 2025 6-5
Figure 6-1
Main Street Guidelines

Page 482 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-6
Figure 6-2
Main Street Entry Guidelines

Page 483 of 1440 ends

Revised January 2025 6-7
Figure 6-3
Retail Main Street Architecture Guidelines

Page 484 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-8
Figure 6-4
Main Street Architectural Guidelines

Page 485 of 1440 ends

Revised January 2025 6-9
Figure 6-5
Movie Theater Guidelines

Page 486 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-10

7. In areas between buildings that link parking lots to the Main Street pedestrian, include pedestrian walkways a minimum of fifteen feet (15’) wide and a trellis. Provide pedestrian links to public sidewalks and plaza areas from retail buildings.

8. Incorporate current and future Omnitrans bus routes into final design concepts. Provide enough spacing at bus stops for ADA compliance and to provide seating and a shade canopy along all major streets.

9. Locate refuse bins and their enclosures behind buildings and screened with walls and landscape. Include a planter area with vines to soften the wall.

10. Locate loading docks and service areas in the rear of buildings and screened from public view. Design loading areas to prevent truck back-up maneuvers from or onto the public rights of way.

11. Parking areas and parking lots, including cross walks shall be well lighted.

Provide cut-off type luminaires to avoid glare.

12. Enhance parking areas with canopy / shade trees. Screen all parking areas through use of landscaped berms, low masonry walls and / or hedges from public view.

13. Incorporate trees into tree wells or planting strips along the walkways in from of buildings facing the Main Street. Locate trees no greater than thirty five (35’) feet apart to soften and complement the building elevations and to provide shade for the pedestrian.

14. Provide enhanced paving on main pedestrian pathways in parking lots.

See Figure 6-6.

Main Street - Architecture Guidelines

1. Incorporate appropriate architectural styles reminiscent of California’s rich heritage, including, Monterey, Mission, Spanish eclectic, among others. Art deco is a style that could be complementary for the movie theater or as an accent use such as a thematic diner. Refer to Figures 6-3 through 6-5 for examples that meet the intent. Inappropriate styles would be high-tech, modern or rustic.

2. Provide vertical and horizontal variations on building wall planes, building projections, and door and window bays visible to the public. Also provide large windows, colonnades, awnings, and variation in materials.

3. Design all buildings to pedestrian scaled, e.g., massing and form should not overwhelm the street.

4. A variety of roof types are encouraged. Distinct and interesting rooflines are preferred. Flat roof structures are permitted providing there is variation in heights along the lengths of buildings. Long, unbroken horizontal rooflines are prohibited.

5. The architecture for franchise shops and restaurants, particularly fast food restaurants, should incorporate architectural elements that relate to the overall retail theme of the project.

6. Include a minimum of one significant vertical element extending above the tallest roof lines to provide a focal point and a view terminus on the Main Street.

Page 487 of 1440 ends

Revised January 2025 6-11
Figure 6-6
Pedestrian Walkway Guidelines

Page 488 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-12

7. Decorative awnings, covered walkways, and other enhancements are encouraged as accents.

8. Incorporate one and two-story building massing, with preference for a greater percentage of two-story elements, to create a stronger traditional Main Street character. False second-story elements may be incorporated to provide second story building massing.

9. Provide accent materials such as stone, brick, manufactured stone, accent colors, door and window details, and other enhancements along the first floor level and along all building facades visible to the public. Avoid long unadorned building facades.

10. Include storefront signage along rear facades facing parking lots and / or public spaces in addition to facades facing the Main Street. All signs should be pedestrian oriented in scale.

11. Design building elevations with multiple store front designs instead of one uniform elevation. The intent is to create an eclectic mix of elevations consistent with an Early California vernacular that provides an attractive Main Street character and scale. Provide architectural enhancements on all building corners of the Main Street. Refer to Figure 6-3.

12. Prohibit freestanding fast food drive-thru restaurants on the Main Street as they are not consistent with the character and intent. Fast food restaurants, non-drive thru, may be permitted provided they are incorporated into the overall Main Street architectural character.

13. Provide accent tree planting at all vehicular access points into the site, except service entries.

14. Screen all parking areas from public streets through use of landscaped berms, low masonry walls and/or hedges.

Northwest Corner of Pepper Avenue and Valley Boulevard - Site Planning /Landscape Architectural Guidelines
The northwest corner of Pepper Avenue and Valley Boulevard within Planning Area 16 will be important in establishing a strong and attractive identity for the community and for the retail center in particular. Therefore special guidelines are provided below.

1. Provide a combination fountain, sign monument and plaza. Refer to Figure 6-7 for general design intent.

2. Provide pedestrian access through the plaza at the corner of Pepper Avenue and Valley Boulevard to access shopping areas and the Main Street.

3. Provide specialty paving to enhance the entry character. Paving examples include colored concrete with decorative score lines, colored stamped concrete or stamped AC paving, brick, masonry or other similar materials.

4. Provide accent lighting for the fountain and entry sign.

5. In order to ensure that the corner to the retail center is attractive and inviting, fast food drive thru restaurants shall be subject to a conditional use permit that demonstrates the design intent illustrated in Figure 6-7 can be met.

6. All site planning, landscape and architectural guidelines listed under the Main Street Guidelines above apply to the northwest corner.

Page 489 of 1440 ends

Revised January 2025 6-13
Figure 6-7
Entry Monument/Fountain Concept

Page 490 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-14
Large Format Stores – Site Planning and Landscape Guidelines Large format (department stores and retailers greater than 15,000 square feet) describes development characterized by larger than average retail square footage under one roof. Large format retail development requires extensive parking to accommodate higher parking demand. Within all Retail (R) or Retail Mixed Use (RMU) areas, other than the Main Street or the Northwest retail corner described above, traditional larger format stores are permitted.

1. Provide ample walkways a minimum of twelve feet (12’) in width in front of all buildings to encourage pedestrian use. Also include trees in planting areas or tree wells, at an average of thirty-five feet (35’) on center, within walkway areas adjacent to stores to soften and complement the building elevations and provide shade for the pedestrian. Within common areas provide benches, shade trees, and specialty paving such as colored concrete, colored pavers, or other similar materials.

2. Provide pedestrian walkways to link to the Main Street and surrounding community.

3. Include vehicular access to connect to N. Eucalyptus Avenue.

4. Design entrances and exits to avoid interference with traffic flow along adjacent streets.

5. Locate refuse bins and their enclosures be behind buildings and screen with walls and landscape. Include planter areas with vines to soften the wall.

6. Design loading areas to minimize direct exposure to public view and to prevent truck back-up maneuvers from or onto the public rights-of-ways.

7. Screen loading areas with landscaping to reduce visual impacts.

8. Provide lighting in parking areas and parking lots, including cross walks to the satisfaction of the Development Services Director. Cut off type luminaries shall be provided to avoid glare.

9. Design all ingress and egress into the retail center to minimize impacts on the surrounding uses while permitting ease of access to the center.

10. Enhance parking areas with canopy / shade trees.

11. Provide accent tree planting at all vehicular access points into the site, except at service entries.

12. Screen all parking areas from public view through use of landscaped berms, low masonry walls and/ or hedges.

13. The following minimum tree sizes apply for all development: 5% - 36“ box, 15% - 24” box and 80% -15-gallon.

Large Format Stores – Architecture Guidelines

1. A variety of roof types are encouraged. Distinct and interesting rooflines instead of flat roofed structures are recommended.

2. Include a substantial cornice at the top of a parapet wall or other enhancements.

3. Provide an identifiable base on all big box buildings extending two (2) or more feet up from the finished grade.

Page 491 of 1440 ends

Revised January 2025 6-15
Figure 6-8
Large Format Store Guidelines

Page 492 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-16

4. Include highly resistant base materials to damage, defacing, and general wear and tear. Precast decorative concrete, stone masonry, brick, manufactured stone and commercial grade ceramic tile are examples of acceptable base material.

5. Where practical, locate small retail buildings adjacent to big-box buildings with access from the parking lots areas to create a more human scale setting.

6. To mitigate the appearance of large blank walls visible from public rights of way, incorporate exterior wall treatments such as arcades, portico’s, insets, colonnades, awnings, windows to create variation in massing and materials.

7. Design outdoor gardening facilities or similar outdoor use areas to complement the architecture of the primary building as well as overall site design.

8. Refer to Figure 6-8 for examples that incorporate the design guidelines above.

Hospitality – Site Planning and Landscape Guidelines
Multiple opportunities exist for hotel and motel sites within the Retail (R) and Retail Mixed Use (RMU) land use categories to serve business and recreational travelers. The proximity to restaurants and shopping uses creates an ideal condition for travelers, who typically prefer lodging where they can drive short distances or walk. Hotels and motels may also serve the needs for families of patients at the ARMC and who desire overnight lodging.

While the rendering above shows two hotel locations near the I-10 Freeway and Pepper Avenue interchange, the design guidelines apply to any location, refer also to Figure 6-9.

1. In order to create a presence along a major street frontage, provide direct access to the building along an entry drive and to avoid driving through the parking lot.

2. Provide enhanced landscaping on all street front setback areas, along the building base, adjacent to entrances to hotels and motels, and along property lines visible from offsite or from guest access areas.

3. Provide short term parking spaces near the reception/check in areas.

4. Screen delivery and loading areas to minimize impact on sensitive uses.

5. Screen all mechanical equipment of all types, including swimming pool equipment, to minimize impacts on adjacent uses and from the public right-of-way.

Page 493 of 1440 ends

Revised January 2025 6-17
Figure 6-9
Hospitality Guidelines

Page 494 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-18

6. Design recreational facilities such as swimming to offer privacy to facility users.

7. Avoid locating driveway, garage ramps or loading and service areas where they interfere with the flow of pedestrian movement or impact the privacy of guestrooms.

8. Utilize parking lots and other open spaces on the site to create a buffer between the hotel/motel and the freeway.

9. Screen all parking areas from public view through use of landscaped berms, low masonry walls and/ or hedges.

Hospitality – Architecture Guidelines

1. Divide building bays along the building facades to create interest and in order to avoid long unarticulated wall façades.

2. Design walkway, stairway, balcony railings and other similar details to be visually and stylistically consistent with the basic building design.

3. Exterior corridors on multi-level buildings over two stories located adjacent to residential uses are prohibited.

4. Ensure that all guest rooms are accessible from hallways for structures over two stories, and avoid room entrances directly adjacent to parking lots or exterior walkways.

5. Refer to Figure 6-9 for examples that incorporate the design guidelines above.

Service Stations and Car Washes – Site Planning and Landscape Guidelines
Service stations and car washes are highly utilized uses characterized by unique site features including: Intensive on-site vehicle utilization, on-site repair and servicing, large expanses of paving, use of equipment and machinery, and use of potentially hazardous materials. In order to complement the overall village character for the CHCCSP area, the following site and landscape guidelines shall apply.

1. Orient building elevations containing service or repair bays away from public streets or toward residential uses within three hundred feet (300’) of the property.

2. Group structures together and integrate them into the overall design of a site.

3. Locate service bay door and car wash entry and exit openings away from public streets or residential areas, and provide screening with landscaping to reduce visibility.

4. Provide landscaping within required setback areas consistent with the development regulations and other sections of the Community Design Guidelines. Screen all parking areas from public view through use of landscaped berms, low masonry walls and / or hedges.

5. Provide a fuel delivery truck lane through the site with a minimum turning radius of forty feet (40’) and provide for right side unloading of the vehicle into underground tanks.

Page 495 of 1440 ends

Revised January 2025 6-19
Figure 6-10
Service Station Guidelines

Page 496 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-20

6. For projects located at street corners provide strong design elements to anchor the corner. This can be accomplished using built elements and attractive landscaping features.

7. Enclose storage facilities within the primary structure on the site.

8. Design self-service car wash bays, drying and vacuuming areas to avoid conflict with on-site vehicular circulation.

9. Design self-service car wash bays, and drive-through car wash facilities to ensure all drainage is confined on-site.

10. Provide two-way vehicular access between uses when a service station abuts a commercial development.

11. Shade canopies or structures for a car wash, whether temporary or permanent, shall require approval of the Development Services Director or his / her designee.

12. Provide a seating plaza / customer waiting area with shade trees for drive thru car washes. This is not required for drive thrus that do not provide attendants to wash cars.

Circulation and Parking

1. Design the site so that fuel trucks are able to enter and exit a site with ease and to minimize maneuvering to park and unload.

2. Locate filling pumps, car wash bays, or other on-site facilities to avoid vehicle stacking or overflow onto adjacent streets. Provide vehicle stacking for a minimum of two vehicles per filling pump side.

3. Locate self-service facilities, such as water and air, or telephone so that they do not obstruct on-site circulation.

4. Design all security fencing, in addition to required perimeter walls to be consistent and in character with adjacent architecture.

5. Provide roll-up (or similar) doors at all service bays. Locate all operating mechanisms within the interior of the structure.

Service Stations and Car Washes- Architecture Guidelines

1. Provide architectural variation and interest and all building elevations.

For all building elevations facing public streets, provide enhanced architectural elements. Refer to Figure 6-10.

2. Design all service station buildings in context with the site and complementary to community design standards for adjacent site’s.

3. Avoid corporate or franchise design, except for logos and signage, that does not relate to the overall community character.

4. Design all pump island canopies and canopy / shade structures at car wash facilities with a hip, gable, barrel vaulted, or other roof system to match the architecture of primary structures on the site. Avoid continuous flat roof structures. Temporary canopies are subject to approval by the Development Services Director. See Figure 6-10.

5. Architectural materials to be high quality, durable building materials.

Avoid reflective, glossy and fluorescent surfaces.

Page 497 of 1440 ends

Revised January 2025 6-21

6. Enclose car wash equipment within a permanent structure.

7. Incorporate noise control in car wash building design that minimize noise generated by machinery, blowers, or other mechanical equipment.

8. When service stations / car washes include retail store components, fifty percent (50%) of unobstructed, clear glass is recommended for the store front portion facing a public street.

9. When service stations / car washes include retail uses, provide a clearly defined pedestrian path from required on-site parking to the primary customer entrance.

Drive-Through Businesses – Site Planning and Landscape Guidelines Drive-through businesses include restaurants, banking institutions with drive up teller / ATM access, or other similar facilities. Drive-through businesses require additional site design considerations to mitigate vehicular access, on-site circulation visual and noise impacts. The following supplementary guidelines shall be incorporated into any development providing drive-through service.

1. Create a primary visual presence along the major street frontage with the building, not the parking lot or drive-through lane. To do so, it is recommended that buildings should be located at the minimum front setback line.

2. Screen drive-through aisles from the view of street frontage and adjacent parking areas. through use of landscaped berms, low masonry walls and/ or hedges.

3. Locate drive-through aisles away from adjacent residential structures.

Place menu board speakers to protect adjacent areas from excessive noise.

4. Design drive-through lanes to accommodate car back up at menu board.

5. The following drive-through design features are recommended - a drivethrough lane with a minimum length of one hundred sixty feet (160’), including the following:
¤ A distance of one hundred feet (100’) from the center of the pick-up window or the pay window, whichever is first.
¤ A distance of one hundred feet (100’) from the order or menu board. ¤ Separation of the “drive-through” traffic from pedestrian traffic, vehicular traffic and parking.
¤ Maintain a separate and distinct drive-through lane separate from the parking area.
¤ Drive-through lane widths with a minimum of ten feet (10’) and twelve feet (12’) at curves.
¤ Driveway interference – queuing and circulation must not interfere with ingress and egress at driveways.

Page 498 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-22
Figure 6-11
Drive-Thru Guidelines

Page 499 of 1440 ends

Revised January 2025 6-23
Drive-Through Businesses - Architecture Guidelines

1. Provide enhanced architectural treatment on building elevations facing public streets, whether such elevations function as the front, side, or rear of the building.

2. Screen roof top equipment from public view

3. If the drive-through is part of a shopping center, design the architecture to be compatible with the design of the center.

6.5 Office Guidelines (OFC)
Office Guidelines are intended for all land uses which permit office uses, including Office Mixed Use, Business Parks and Retail Mixed Use areas. One of the primary goals for office buildings areas is to create an office park setting, one that will allow unique designs for individual parcels while at the same time establish unifying elements that complement the overall community.

Additional goals include: 1) creating an office park with quality buildings and landscape that over time will mature into a campus style setting that will enhance the village character of the community, 2) providing pedestrian and vehicular connectivity to the community and, 3) accommodating the needs for functionality in order to be responsive to a broad cross-section of office park developers and tenants.

Refer to the sketches, plans and photographs in Figures 6-12 through 6-14.

Office - Site Planning and Landscape Guidelines

1. In order to create an office park campus atmosphere along Valley Boulevard, locate parking areas on the rear or side areas so only landscaping and walkways will occur between the boulevard and building.

2. In order to facilitate location of the entry and to enhance the architecture, identify primary entries to buildings with a prominent element such as an architectural canopy or deep building recess or other similar element.

3. Link office buildings together with pedestrian walkways. Also, to encourage walking in the community, link office buildings to public sidewalks within the nearest street public right-of-way.

4. Where two or more buildings are located on one lot, provide an outdoor courtyard, plaza or other useable space. Include benches, tables, and / or seat walls plus shade trees.

5. Where parking occurs adjacent to a building, provide a minimum of eight and one half (8.5’) feet of perimeter landscape between the building and the parking. Include trees, shrubs and ground covers in these landscape areas. Whether trees are equally spaced or in groupings, an average spacing of thirty-five feet (35’) is recommended. The following minimum tree sizes apply for all development: 5% - 36 “ box, 15% - 24” box and 80% -15-gallon.

6. Enhance parking areas with canopy type shade trees.

Page 500 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-24

7. Screen all parking areas from public view through use of landscaped berms, low masonry walls and/ or hedges.

8. Enhance a minimum of one primary vehicular entry area with special paving. Examples of enhanced paving include colored concrete with decorative score lines, colored stamped concrete or stamped AC paving, brick, masonry or other similar materials.

9. Loading docks and service areas shall be to rear of buildings and screened from public view.

10. Locate refuse bins and their enclosures behind buildings and screened with walls and landscape. Provide a planting area around trash enclosures and plant vines along walls.

11. Provide well-lit parking areas and parking lots, including cross walks in accordance with City requirements.

12. Design all ingress and egress into office uses to minimize impacts on the surrounding uses while permitting ease of access.

13. Provide accent tree planting at all vehicular access points into the site, except service access points.

Office - Architecture Guidelines

1. For all office building, consider the characteristics of the site and relate designs to the surrounding built environment in scale and character.

2. Coordinate colors, materials and finishes on all exterior elevations of all buildings to achieve continuity of design. Earth tones are encouraged, consistent with the examples shown in Figures 6-12 through 6-14. Avoid bright orange, pink or other intense colors. Materials may be concrete, stone, brick. In the event stone, brick or other similar material is used, manufactured / cultured stone materials shall be permitted. Such materials shall be of high quality and durability.

3. Locate primary entries so they are visible from a public street and accessible to pedestrian walks that link to other parts of the community.

4. Provide an architectural element at primary entries such as an arch, canopy or other similar element to facilitate locating building entries and to create a sense of entry.

5. Incorporating architectural moldings along the roof line of buildings is recommended to occur on buildings to add interest and to create an overall unifying theme to the community.

6. A variety of roof forms are permitted with the office uses. Gable, hip and flat roofs are all acceptable. Flat roofs should be accented or hidden by a parapet wall. Whichever roof form is selected, all roof top equipment shall be screened with a wall material and color complementary to the building material.

7. Refer to Figures 6-7 through 6-9 for additional guidelines. The descriptions provided with each Figure are intended to identify major design elements that are recommended for all office buildings.

Page 501 of 1440 ends

Revised January 2025 6-25
Figure 6-12
Office Guidelines

Page 502 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-26
Figure 6-13
Office Guidelines

Page 503 of 1440 ends

Revised January 2025 6-27
Figure 6-14
Office Guidelines

Page 504 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-28

6.6 Business Park
The following are the goals to create a high quality business park: 1) create a setting with quality buildings and attractive landscape that over time will mature into a campus like environment and complement the “Village” character and vision planned for the CHCCSP area, 2) provide pedestrian connectivity to the overall community, 3) accommodate the needs for functionality in order to be responsive to a broad cross-section of Business Park developers and tenants, and 4) allow unique designs for individual parcels while at the same time establish unifying elements that complement the overall community.

Refer to the sketches, plans and photographs in Figures 6-15 to 6-19 and to Section

4.0, Development Regulations.

Business Park - Site Planning / LandscapeGuidelines

1. In order to establish a village scale and campus character envisioned for the CHCCSP, a maximum building length of two hundred twenty-five feet (225’) shall be maintained within all Business Park areas. The intent is to avoid big box warehousing and distribution developments and the associated truck traffic, which detracts from the health, safety and welfare of the larger community.

2. Locate Business Park buildings with the primary entry visible from the public street and accessible from pedestrian walks that connect to the street. The intent is to encourage walking to and from other uses within the community.

3. Identify primary entries to buildings with a prominent architectural element such as an architectural canopy or deep building recess or other similar element to provide a sense of entry.

4. Provide attractive landscape areas within building setbacks adjacent to public streets that will reinforce a campus setting.

5. Enhance parking areas with shade trees. Screen all parking areas from public view with a berm, wall, and / or hedge pursuant to the development regulations.

6. Plant landscape areas adjacent to buildings with trees, shrubs and ground covers. Trees may be grouped equally or in groups. In order to soften the building elevation and to promote a campus character, provide tree spacing at an average of thirty-five feet (35’) on center. The following minimum tree sizes apply for all development: 5% - 36 “ box, 15% - 24” box and 80% -15-gallon.

7. Provide a minimum of one enhanced (1) primary vehicular entry area with special paving. Examples of enhanced paving include colored concrete with decorative score lines, colored stamped concrete or stamped AC paving, brick, masonry or other similar materials. Consistency between enhanced paving within each planning area shall be provided.

8. Locate loading docks and service areas to rear of buildings and screened from public view.

Page 505 of 1440 ends

Revised January 2025 6-29

9. Locate refuse bins and their enclosures behind buildings and screened with walls and landscape. A minimum of a two feet (2’) wide planting area, planted with vines, is required around trash enclosures.

10. Provide well lighted parking areas and parking lots, including crosswalks in accordance with City requirements.

11. Design all ingress and egress into office uses to minimize impacts on the surrounding uses while permitting ease of access.

Business Park - Architecture Guidelines

1. Simple, clean forms are preferred with prominent architectural elements at corners and / or the mid-section of all buildings emphasizing primary entries.

2. Place special attention on buildings facing the I-10 Freeway, Valley Boulevard and Wildrose Avenue. For buildings visible from these public corridors, the intent is to create a character reflective of an office building complex with clear or spandrel glass along the entire elevation similar to the examples in Figure 6-18.

3. Coordinate colors, materials and finishes on all exterior elevations of all buildings to achieve continuity of design. Earth tone colors, consistent with the examples shown in Figures 6-11 through 6-14 are encouraged.

Avoid bright orange, pink or other intense colors. Materials may be concrete, stone, or brick. In the event stone, brick or other similar material is used, manufactured / cultured stone materials are permitted. Such materials shall be of high quality and durability.

4. A variety of roof forms are permitted. Gable, hip and flat roofs are all acceptable. Accent or hide flat roofs with a parapet wall. Whatever roof form is selected, screen all roof top equipment with a wall material and color complementary to the building material.

Page 506 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-30
Figure 6-15
Business Park Guidelines

Page 507 of 1440 ends

Revised January 2025 6-31
Figure 6-16
Business Park Guidelines

Page 508 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-32
Figure 6-17
Business Park Guidelines

Page 509 of 1440 ends

Revised January 2025 6-33
Figure 6-18
Business Park Guidelines

Page 510 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-34
Figure 6-19
Business Park Guidelines

Page 511 of 1440 ends

Revised January 2025 6-35

6.7 Residential Guidelines
As described in the Community Vision, the primary objective for the residential neighborhoods is to create an attractive, pedestrian friendly, village environment with the charm and character of many older California communities. The guidelines and exhibits below provide the methods to accomplish these objectives.

Residential - Site Planning and Landscape Guidelines

1. In order to create an attractive street scene, provide “front forward” architecture. This includes locating first floor living areas in front of the garage and turning the garage at a right angle (side-on garages) to the street. Vary building setbacks between the sidewalk and building face in the range of five to ten feet (5’-10’) between adjacent homes, so no two homes are aligned evenly across a street.

2. Provide a minimum of 30% side-on garages of homes along any one street.

Include a window on the face of the garage consistent with other windows on the front elevation of the home.

3. Enhance all four sides of the home, also referred to as 360 degree architecture. Include front porches, balconies, pitched roofs and other architectural features that enliven and activate the street for pedestrians.

Attached Homes

1. Create a pedestrian scaled setting along streets by orienting living areas to face streets and open spaces with garages located behind homes in alley ways or motor courts. This also provides “eyes on the street” that adds to the community security.

2. Whenever possible, interior buildings should be configured around courtyards, gathering areas and open spaces. Amenities should be provided appropriate to the different age groups.

3. Provide a layering of landscape materials with trees, large and small shrubs and ground covers to enhance each home and the community as a whole.

4. Energy efficiency and energy conservation should be considered in siting of buildings.

Residential – Architecture Objective Design Standards
The residential guidelines are intended to promote diversity within the context of an Early California character. Diversity of styles has several advantages including 1) adds architectural richness and interest and 2) providing flexibility to home builders as they will have many architectural options to choose from and will not be constrained by any one particular style.

The examples provided and the guidelines below shall be used as the design criteria for all residential and residential mixed use architecture.

Page 512 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-36
Architectural Styles
A variety of architectural styles are included in Figures 6-20 through 6-23 that complement the Early California theme including Monterey, Craftsman, Spanish Eclectic and Cottage Styles.

Other Early California styles not described in the following Design Guidelines are permitted provided they are true to their origins and incorporate design features of the period. If a style is requested that is not included in these guidelines, the applicant shall provide exhibits that include the same information as occurs within the architectural style Figures in this CHCCSP. The exhibits shall include color photographs of representative homes / buildings that incorporate the style, along with a summary of the appropriate building and roof form, colors, and details for review and approval of the Development Services Director or his / her designee.

Modern or High tech or similar styles not consistent with an Early California heritage shall be avoided. However, for live work homes in Planning Areas 16A and 24, a more contemporary architectural character may be considered, subject to approval of the Planning Commission.

Architectural Standards
The following summarizes the major design principles that shall be incorporated into each floor plan and all building elevations. Refer to Figures 6-24 to 6-31 for additional principles and guidelines as well as Sections 6.8, 6.9, and 6.10 for residential mixed use.

Massing and Scale: The articulation of building facades and variation in rooflines increases the attractiveness in residential architecture. The location of certain building elements also improves massing and scale. On single-family homes, placing one-story elements on two-story houses at street corners effectively steps down the scale and massing, providing a more pedestrian friendly street scene.

Therefore, on corner lot conditions for the single-family homes, architects are encouraged to provide single story elements such as entry canopies, trellises, porches, or other single story architectural enhancements.

Building Materials and Colors: Both play an important role enhancing each neighborhood and the community in general. While earth tones are preferred to complement the early California theme, a variety of color palettes are recommended in order to avoid a monotonous or continuous appearance of buildings. Contrasting of a dark trim against a light house color is one example.

Examples of preferred color palettes that blend with the community theme are provided in the photographs in Figures 6-20 to 6-31 that follow. Bright orange, pink or other intense colors shall be avoided.

Window Details: Window details differentiate architectural styles and provide a high level of architectural enrichment. The selection and proportion of the windows to the facade should be responsive to the architectural style of the building. Size and shape should be considered to assure a balanced relationship with the surrounding roof and walls. Accent shutters are ways to further enhance the architecture and should be in keeping with the scale of the windows. In general, windows should enhance rather than dominate the overall architectural character.

Page 513 of 1440 ends

Revised January 2025 6-37
Porches and Balconies: Another way to add to the architectural interest and functionality of a building is to incorporate porches and balconies. They help add depth to a building facade and break up large wall masses. Front porches and balconies also provide a pedestrian friendly scale and opportunity for social interaction. The design of the porch or balcony shall be consistent with the architectural style.

Columns and Posts: Whether serving as structural or aesthetic elements, columns and posts can reinforce the theme and character of a particular architectural design. The size and scale of columns and posts will vary depending upon the architectural style and should convey a solid, durable image. They may be freestanding or used as a support.

The Articulation of Rear and Side Building Facades: Where homes are visible from streets or alleys, enhancement of rear and side elevations facing the public domain (e.g. public roads, parks, habitat areas) are an important consideration to ensure a quality community. Therefore, the architectural treatments for these conditions shall incorporate architectural enhancements such as enhanced window treatments, moldings, balconies and other appropriate details.

Floor Plans and Elevations: For planning areas that include single-family detached homes, a range of floor plans and elevations shall be provided. A minimum of three (3) different floor plans is required for each planning area with a minimum of three (3) elevations required for all detached homes. Matching elevations should not be repeated adjacent to one another or opposite one another.

For attached homes, a minimum of three (3) distinct architectural elevations are required for duplexes and triplexes. A minimum of two (2) elevations are required for fourplex or greater buildings unless approved by the Development Services Director or his /her designee due to unique design conditions.

Page 514 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-38
Figure 6-20
Cottage Style Architecture Guidelines

Page 515 of 1440 ends

Revised January 2025 6-39
Figure 6-21
Craftsman Style Architecture Guidelines

Page 516 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-40
Figure 6-22
Spanish Eclectic Style Architecture Guidelines

Page 517 of 1440 ends

Revised January 2025 6-41
Figure 6-23
Monterey Style Architecture Guidelines

Page 518 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-42
Figure 6-24
Window Guidelines - Residential

Page 519 of 1440 ends

Revised January 2025 6-43
Figure 6-25
Porches and Balconies Guidelines - Residential

Page 520 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-44
Figure 6-26
Columns and Posts Guidelines – Residential

Page 521 of 1440 ends

Revised January 2025 6-45
Figure 6-27
Motorcourt Guidelines Res-M1

Page 522 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-46
Figure 6-28
Townhouse Guidelines Res-M1

Page 523 of 1440 ends

Revised January 2025 6-47
Figure 6-29
Garden Court Guidelines Res-M1

Page 524 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-48
Figure 6-30
Garden Court Guidelines Res-M1

Page 525 of 1440 ends

Revised January 2025 6-49
Figure 6-31
Garden Court Guidelines Res-M1

Page 526 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-50

6.8 Residential Mixed Use Objective Design
Standards – Site Planning
As described in the Community Vision in Section 1.5, the objectives for the residential mixed use neighborhoods are to create an attractive, pedestrianfriendly, mixed use environment with the charm and character of many older California communities detailed in Section 6.3. The standards and exhibits below provide the methods to accomplish these objectives.

Residential Mixed Use – Building Orientation and Layout

1. Building entries shall face the primary public street with pedestrian access provided from sidewalks to all building entries, parking areas, and publicly accessible open spaces. An exception, in the case of larger sites with multiple buildings, building entries may also be oriented to face internal common open spaces, paseos, and recreational amenities.

1. Building entry orientation

2. A minimum of 60% of the street frontage shall be devoted to buildings located between the minimum and maximum front setback lines. The remaining 40% may be devoted to public courtyards, plazas, recessed entries, and driveways.

3. For buildings located across the street from single family residential and Res-M1 zoned lots, parking lot areas shall not be located along the singlefamily neighborhood street frontages.

4. If adjacent to single family residential or Res-M1 zoned lots, windows, balconies, or similar openings shall be oriented so as not to have a direct line of sight into adjacent units or onto private patios or backyards adjoining the property line. This can be accomplished through the following: step backs of upper stories; window placement; use of clerestory windows, glass block, or opaque glass; or mature landscaping within the rear or side setback areas or other techniques.

5. Ground-floor residential fronting or siding onto major and secondary arterial roadways (i.e. Valley Boulevard and San Bernardino Avenue)

Page 527 of 1440 ends

Revised January 2025 6-51
shall be elevated at least 24 inches (24”) above the finished grade of the sidewalk.

6. Buildings shall be arranged so that they provide common open spaces as required in Chapter 4.0.

7. Surface parking shall be located to the sides and rear of the lot with building massing oriented to the street, to the greatest extent possible.

7. Parking location

8. Setbacks
a. Buildings with ground floor residential are permitted landscaping and protrusions including stairs, a porch, a stoop, a patio, a terrace, a forecourt, a courtyard and/or low wall located between the minimum and maximum front setback lines to
provide a transition space.

Page 528 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-52

8.a. Ground-floor residential setback
b. Buildings with non-residential ground floor uses shall have usable and accessible open space between the minimum and maximum front setback lines that accounts for forty percent (40%) of the setback and may include paved pedestrian spaces for patios and outdoor seating or usable lawn space. Landscaping or a low wall may be permitted within the forty percent (40%) of the setback but may not occupy the entire setback.

8.b. Ground-floor non-residential setback

Page 529 of 1440 ends

Revised January 2025 6-53
Residential Mixed Use – Site Access and Parking

1. Main entries and lobbies shall be oriented toward and visible from the primary street frontages or open space areas that connect directly to the primary street.

1. Main entry orientation and visibility
a. Where there are multiple buildings in a project or if the building is not located adjacent to a primary street, entries may also be oriented to internal circulation streets parking areas, internal pedestrian walkways, or common open spaces that connect directly to a street.

1.a. Alternative building entry orientation

2. Connections shall be provided between new projects and adjacent neighborhood streets and pedestrian and bicycle paths. Connecting streets shall be designed to discourage overloading traffic on existing streets.

Page 530 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-54

3. Building and Unit Entrances.
a. Ground-floor unit entrances shall be accessed via an internal corridor, porch, stoop, patio, terrace, forecourt, and courtyard served by a sidewalk or other designated walkway.

3.a. Ground-floor entrances
b. Upper-floor unit entrances shall be accessed via an internal corridor to avoid long, monotonous balconies and corridors.

4. Pedestrian access shall be provided from the sidewalk at the street frontage to building entries and parking areas.

5. Pedestrian connections shall be provided to adjacent amenities, paths or trails, and/or other connections to adjacent properties.

6. All end parking stalls shall be adjacent to landscape planters as set forth in Chapter 4.0.

7. Parking shall be screened from the street by landscaping, berms, low walls or fences, buildings or a combination of any two (2) as set forth in Section

6.10. 7. Parking screening

8. No more than forty percent (40%) of the public right-of-way frontage shall be used for parking access or driveways.

Page 531 of 1440 ends

Revised January 2025 6-55

9. Parking structures above ground shall be designed to meet the following standards:
a. Be lined or wrapped with residential or commercial uses with a minimum depth of twenty feet (20’) or the required active frontage depth for that location; or

9.a. Parking wrapped with residential
b. Be designed and treated with the same level of architectural detail, material quality, and facade articulation as other facade areas and/or screened with landscape screening (e.g., shrubs, trees, landscaped trellises) and/or ornamental screens.

9.b. Screened parking structure
c. Be below ground-floor residential or commercial units, garage walls shall not extend above finished grade. No portion of the parking structure shall be visible from a primary street.

10. Parking structures located on Valley Boulevard are limited to one (1) access point per 300 linear feet off Valley Boulevard, all other entries shall be limited to side or rear streets.

Residential Mixed Use –Utilities and Trash Enclosures

1. All utility equipment shall be located out of the pedestrian path of travel and purposefully and aesthetically placed adjacent to alleyways, within parking areas, rear or side yards, or within building “notch outs” and screened from public view.

Page 532 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-56

2. All electrical utility equipment, electrical meters, and junction boxes shall be placed within a utility room. If a utility room is not feasible, then all utility equipment shall be purposefully designed as an integral part of the building development, placed adjacent to alleyways, within parking areas, or within rear or side yards, and screened from public view.

3. Mechanical equipment shall be placed in the back of the unit and not visible from public view or screened with landscaping or placed on the roof and screened with architectural materials such as roof or parapet consistent with the overall architectural style.

3. Screened parking structure

4. Trash containers shall be stored within designated storage areas and located away from building fronts and major entries, and/or screened from view in fixed enclosures and comply with the City Zoning Ordinance Chapter 18.23.1.090.

4. Trash enclosure screening

5. Enclosures shall be separated from adjacent parking stalls with a minimum four foot (4’) wide planter area.

Page 533 of 1440 ends

Revised January 2025 6-57

6.9 Residential Mixed Use – Building Design
Residential Mixed Use – Building Form

1. The maximum length of any individual building shall be two hundred (200’) linear feet, regardless of the number of units.

2. At least two different architectural styles, as defined in Chapter 6.7, shall be included in projects with more than ten (10) buildings.

3. For residential projects three stories or taller, the development shall use one or more of the following strategies:
a. Utilize roof forms and low pitches between 2:12 and 4:12 as detailed in Chapter 6.7;
b. Integrate the upper floor units into the roof form;
c. Step back upper floors above the third story; or
d. Use a different material on the top floor walls to visually make the building seem lower.

1. & 3.c. Maximum building length & Step back

4. Buildings located at street corners shall include at least two of the following corner treatments:
a. Change in Fenestration Pattern. One (1) fenestration pattern (size, shape, and/or orientation or windows and doors) different from the rest of the façade.
b. Change in material. At minimum fifty percent (50%) of the corner area uses a different material than the rest of the building/façade.
c. Change in Height. A change in total height of at least four feet greater or less than the height of the abutting primary façade.

Page 534 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-58
d. Roof Line Variation. A different roof line than the rest of the façade.
e. Special Architectural Feature. A special architectural feature such as a tower or cupola.

4.a.b.c. 4.d.e
Residential Mixed Use – Height, Massing, and Articulation

1. Where a residential development is three stories or less, the vertical massing of buildings shall be articulated to express each individual unit.

2. Structures three stories or more should emphasize horizontal planes through the use of trim, awnings, eaves, other ornamentation, or a combination of complementary colors.

2. Horizontal planes

3. The upper story of buildings over two stories shall be stepped back at least four feet to reduce the scale of façades facing streets, courtyards, or open space areas.

4. Buildings over three stories shall have major massing breaks at least every one hundred feet (100’) along any street frontage, adjacent public park, publicly accessible outdoor space, or designated open space, through the use of varying setbacks and/or building entries. Major breaks shall be a minimum of five feet (5’) deep and twenty-five feet (25’) wide and extend the full height of the building.

Page 535 of 1440 ends

Revised January 2025 6-59

5. Buildings shall have a minor massing breaks at least every fifty feet (50’) feet along the street frontage through the use of varying setbacks, building entries and recesses, or structural bays. Minor breaks shall be a minimum of one foot (1’) deep and four feet (4’) wide and extend the full height of the building.

4. & 5. Major and minor massing breaks

6. The street-facing front façades of buildings shall provide at least three of the following articulation elements that are at least twelve inches (12’’) deep and spaced no more than thirty feet (30’) apart:
a. A covered porch;
b. A balcony;
c. A recessed entrance;
d. One or more dormer windows;
e. Columns, pillars, or posts;
f. Eaves projecting at least twelve inches (12”) from the façade plane;
g. Awnings or canopies;
h. Multiple windows with a trim at least four inches (4”) wide; or i. Integral planters that incorporate landscaped areas or places for sitting.

6. Building articulation

Page 536 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-60

7. A clear separation between the ground floor and floors above shall be provided, which may consist of any of the following:
a. A line of awnings or canopies over ground-floor storefronts or windows;
b. A change in material;
c. A change in the scale of openings; and/or
d. A change in building plane, with the middle of the building either recessed from or projecting over the ground floor.

7.b.c. 7.c.d.

8. Ground floor walls along sidewalks or publicly accessible outdoor space areas, that are blank (facades without doors, windows, landscaping treatments, or public art) shall span no more than thirty feet (30’) feet in length.

Residential Mixed Use – Open Space

1. Open space areas shall not be located directly next to arterial streets, service areas, or adjacent commercial development so as to ensure these open space areas are sheltered from the noise and traffic of adjacent streets or other incompatible uses. Alternatively, a minimum ten foot (10’) wide landscaping planter or hedge shall be provided as screening between the open space area and arterial street, service area, or commercial development.

2. Open space surfaces shall include a combination of lawn, garden, pavers, wood planking, concrete, or other serviceable surfacing. The slope shall not exceed ten percent (10%).

Residential Mixed Use – Roof Forms, Entries, and Windows

1. Rooflines shall be broken at intervals no greater than fifty feet (50’) in length without at least of the following:
o Provide variation in roof forms including gabled, hipped, or flat with a parapet wall.
o Provide variation in architectural elements, such as parapets, cornices, and chimneys.
o Provide variation of roof height of at least 18 inches (18”).

Page 537 of 1440 ends

Revised January 2025 6-61

2. When nonresidential and residential uses are located in a vertical mixed use structure, separate pedestrian entrances shall be provided for each use.

3. Long, monotonous balconies and corridors that provide access to multiple units shall be avoided. Instead, access points shall be clustered.

4. Main building entries shall be defined by the use of architecturally compatible elements detailed and set forth in Section 6.7 including but not limited to one or more of the following: canopies, arches, arcades, columns, awnings, decorative lights, small entry plazas, and vertical massing.

5. Building walls along all street frontages shall have windows at all floors above ground level.

6. Windows shall be articulated with sills, trim, shutters, or awnings authentic to the architectural style of the building as set forth in Section

6.7. 7. Glass shall be clear with a minimum of eighty-eight percent (88%) light transmission. Mirrored and deeply tinted glass or applied films that create mirrored windows and curtain walls are prohibited. To add privacy, reduce glare, and provide aesthetic variety to glass, fritted glass, spandrel glass, electrochromic glass, solar control glass, and anti-reflecting glass are appropriate.

Residential Mixed Use – Garages

1. Garages shall not be located adjacent to the primary street unless there is no other driveway access available onsite for residential parking. Where visible by the public or by other residents, garage doors shall be recessed a minimum of four inches (4”) and/or accompanied by projecting elements like porches, bay windows, trellises, architectural ornament, and/or landscaping.

2. Garage doors shall be designed consistent with the overall style of the building. Material, pattern, and color shall be coordinated with the architectural style as set forth in Section 6.7.

3. Garage entries, loading and service entries, utility rooms, stairs, elevators, and other similar inactive elements shall occupy no more than twenty percent (20%) of the width of a public street-facing building façade.

6.10 Residential - Site Landscape, Wall and Fence
Guidelines
Each residential site shall be required to adhere to the minimum following guidelines and standards in addition to those listed in Section 4.0, Development Regulations, and other Sections of the CHCCSP.

Multifamily and Residential Mixed Use development with public and common area landscaping:

1. Provide landscaping in all public and private common areas within the project site or as otherwise required by the Development Services

Page 538 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-62
Director. For private use areas enclosed by four feet (4’) to six feet (6’) high privacy walls or fences, separated by other similar architectural elements, no landscaping is necessary to be provided by the builder or developer.

2. Select plant materials for common areas from the Landscape Palette located in the Community Design Guidelines. Additional plant material may be selected if approved by the Development Services Director or his/her designee.

3. Provide a minimum of fifteen percent (15%) of the total site for common area landscaping. The fifteen percent (15%) is in addition to the landscape area within parkways between sidewalks and streets and any private yard areas enclosed by a wall exceeding a height of four feet (4’).

4. Select street trees for public rights-of-ways that are consistent with the landscape sections and Community Design Guidelines provided herein.

Provide 33% of total boxes at a minimum twenty-four inch (24”) box size and 67% of total boxes at 15 gallon size for street trees in parkways between a sidewalk and curb shall. Street trees are not intended to be included to satisfy the minimum twenty percent (20%) for the common areas.

5. In common areas, provide the following minimums: fifteen (15) gallon minimum tree sizes, with twenty percent (20%) of all trees a minimum of twenty-four inch (24”) box size and five percent (5%) of all trees a minimum of (36”) box size.

6. All areas used for private patios may be screened with a four feet (4’) to six feet (6’) high masonry wall or vinyl fence material pursuant the Community Design Guidelines. However, if less than eight feet (8’) occurs from a sidewalk to a wall where there are fronts or sides of homes adjacent to a public or private street, then the maximum wall height shall be three feet (3’). There shall be no less than two feet (2’) of planting area depth from the face of any wall of any height to a sidewalk or other paved surface, in order to allow for plant materials such as vines and hedges to be planted.

7. No wood fences are permitted within the CHCCSP project area, except for use as access gates in residential areas. Other walls or fences, such as those manufactured with composite materials shall be subject to approval by the Development Services Director or his / her designee. Refer also to Section

4.0, Development Regulations, for additional wall and fence requirements within each land use category.

Residential Privacy Walls and Fences
Where walls or fences occur for privacy between homes, along alleys adjacent to the open space areas, or on corner lots, provide a masonry or vinyl material that complements the building architecture. This includes slumpstone, split face block, stucco finished masonry walls, and vinyl fences. On masonry walls, provide a minimum three inch (3”) high masonry caps. Refer also to Section 4.0, Development Regulations, for additional wall and fence requirements within each land use category.

Page 539 of 1440 ends

Revised January 2025 6-63
For common refuse enclosures, they shall provide a separate gate for recycled material with a sign similar to the example that follows.

6.11 Community Entry Monuments, Walls and
Fences

6.11.1 Entry Monument Guidelines
Community entry monuments are planned at several key locations as part of establishing an overall community identity. The design intent is to create a consistent theme and vocabulary of materials for all residential and commercial / business park areas. The Colton’s Hub City Centre community name and / or logo is included on each monument. The name is subject to change in the future at the discretion of the City Council. Refer to Figure 6-32, Community Wall and Entry Monument Plan for locations of each of the monuments. Sketches and elevations of the monuments are referenced below.

Valley Boulevard and Pepper Avenue
The primary entry into the community occurs from the I-10 Freeway at Pepper Avenue. In order to create a dramatic entry statement and sense of arrival for the entire Specific Plan area, a combination fountain and monument is planned at the northwest corner of Valley Boulevard and Pepper Avenue. A rendering of the concept is shown in Figure 6-33.

Wildrose and Meridian Avenues at Valley Boulevard
Monuments shown in Figure 6-34 are located at these two key entry areas into Commercial / Business areas.

Indigo Avenue and N. Eucalyptus Avenue at San Bernardino Avenue Entry monuments into the residential neighborhoods are shown in Figure 6-34. In order to reinforce an overall community identity, the same vocabulary of materials is used as in the Commercial / Business Park areas.

6.11.2 Community Wall And Fence Guidelines
Community Theme Wall
Community walls are located in residential areas along the project boundary and along streets based on traffic and / or noise considerations. Exceptions to community wall locations include open space boundaries and where easements

Page 540 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-64
do not allow walls. As is the case with entry monuments, the intent is to establish a consistent theme of materials within the community. Refer to Figure 6-32 respectively for wall locations and types.

The height of community walls typically will be six feet except where necessary for noise attenuation. The Development Service Director may select the appropriate height, material and style of the community wall. Acoustical studies will be provided by applicants prior to any residential development to determine required wall heights.

In order to soften the character of walls and to provide a graffiti resistant surface along the public facing side of streets, vines such as Boston Ivy are recommended.

Wood Fences
No wood fences are permitted within the CHCCSP, except for use as access gates to residential yards, up to three (3) feet high picket or similar type fences in front yards. All walls in residential development areas shall be a tan colored slump stone, split face block, or other equivalent material approved by the Development Services Director.

6.12 Community Streetscape Master Plan and
Guidelines
Streetscapes play an important part in developing a distinctive community. Trees, shrubs and groundcovers within parkway, medians, and landscaped setback areas adjacent to the public rights of way all contribute to creating a unified and beautiful community. The streetscape design elements for the major and local streets within the CHCCSP are described below and illustrated in Figure 6-34, and Urban Management Forestry Plan, and Figures 6-35 through 6-39, Streetscape Sections. While specific tree types have been selected for each of the major streets, they may be revised by Development Services Director and his / her designee. In the event they are changed, it is recommended that the form and shape of each substituted tree be similar to those for the respective street tree in the Urban Management Forestry Plan.

All street trees within parkways, between the sidewalks and curbs, are intended to be planted with equidistant spacing versus informal groupings within the medians on Valley Boulevard, Pepper Avenue, and San Bernardino Avenues.

Trees are shown in informal groupings, which is already the case in existing segments of the Pepper Avenue median.

Valley Boulevard
Parkway Trees: Chinese Pistache
Median Trees: Date Palms and Crape Myrtle
Chinese Pistache are broad dome trees, with leaves that turn burgundy in the fall and provide an excellent shade canopy. While the trees are deciduous during the winter, the Southern Magnolias in the median will provide year round foliage.

Page 541 of 1440 ends

Revised January 2025 6-65
Flowering Crape Myrtle trees are also included in the median and will provide summer color.

Pepper Avenue
Parkway Tree: Australian Willow Median Trees: Date Palm and Jacaranda On the east side of Pepper Avenue, within the public right-of-way and adjacent to the Arrowhead Regional Medical Center property, there exists a curb adjacent sidewalk and a variety of mature trees in the landscape area with groupings of California Pepper trees, among others tree varieties.

On the west side of Pepper Avenue that is part the Specific Plan, a new parkway and sidewalk is planned as development occurs. The Australian Willow an evergreen tree that forms a shade canopy tree is shown. It will complement the California Pepper trees along the Medical Center site without the high maintenance associates with the Pepper tree.

Jacaranda trees are presently located within the median and are intended to remain. Additional groupings of Date Palms, which provide year round foliage are shown to further enhance the streetscape.

San Bernardino Avenue
Parkway Tree: Tipu Tree
Median Trees: Camphor Tree and Crape Myrtle
The Tipu tree provides a broad dome deciduous tree with yellow summer flowers that provides an excellent shade canopy during the warmest seasons. While these trees are deciduous during the winter, evergreen Camphors in the median will provide year round foliage. The Crape Myrtles which flower during the summer will provide a seasonal accent.

Along residential areas, a landscaped setback area of five feet (5’) minimum is required between the public sidewalk and the future community theme wall. (See Section 4.0, Development Regulations). Evergreen pines are recommended in this landscaped setback area to enhance the streetscape on San Bernardino Avenue and buffer the adjacent residential uses from the road.

Meridian Avenue
Parkway Tree: Southern Magnolia: An upright evergreen tree with white flowers in the summer.

Page 542 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-66
Figure 6-32
Community Wall and Entry Monument Master Plan

Page 543 of 1440 ends

Revised January 2025 6-67
Figure 6-33
Community Entry Monument A

Page 544 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-68
Figure 6-34
Entry Monument Guidelines

Page 545 of 1440 ends

Revised January 2025 6-69
Figure 6-35
Streetscape Section

Page 546 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-70
Figure 6-36
Streetscape Section

Page 547 of 1440 ends

Revised January 2025 6-71
Figure 6-37
Streetscape Section

Page 548 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-72
Figure 6-38
Streetscape Section

Page 549 of 1440 ends

Revised January 2025 6-73
Figure 6-39
Streetscape Section

Page 550 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-74
Indigo Avenue and C Street
Parkway Tree: London Plane Tree: An upright deciduous tree that provides excellent shade during the hot summer months.

N. Eucalyptus Avenue
Parkway Tree: Evergreen Ash: An upright broad spreading shade tree.

Street A
Parkway Tree: Tipu Tree: A broad dome shade canopy with yellow seasonal flowers.

Parkway Tree: London Plane Tree. An upright stately tree that provides excellent shade during the hot summer months.

These two streets are near mirror images of each other on the land use master plan and are intended to include similar street trees. The evergreen Southern Magnolia, a stately tree that is well adapted to the area, will create a strong streetscape character. It is evergreen year round and flowers during the summer months.

Hermosa Street
Parkway Trees: Australian Willow: Similar leaf shape and character to a California Pepper, but much cleaner, less maintenance.

Wildrose Street
Parkway Trees: Australian Willow in residential areas to the north portion of the road and Southern Magnolia to the south in the Commercial / Business Park areas.

To differentiate commercial and residential areas, two trees are recommended with Southern Magnolia in the residential areas and Australian Willow in Commercial / Business Park areas.

6.13 Open Space Plan - Park and Habitat
A total of 48.4 acres of preserved habitat are provided in the plan in PA’s 3, 6, 11 and 18. While they provide open space for the community, they are reserved for protection of the Delhi Sands Fly and are not intended for public use.

Planning Area 13 is the site of an existing stormwater basin to accommodate flows from the north –side of San Bernardino Ave. This 9.4 acre site also doubles as a park. The site is enclosed with a wrought-iron fence and gate along San Bernardino Ave, and chain link along the remaining three sides. The park includes playing fields in the basin, and a parking lot and concrete pads with picnic tables, outside the basin. Future improvements to this park would be governed by guidelines set forth in Section 6.0, Community Design Guidelines.

Page 551 of 1440 ends

Revised January 2025 6-75
Figure 6-40
Open Space Plan

Page 552 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-76
Refer to Figure 6-40 for the Open Space Plan that identifies the park and habitat areas. Park uses and design, including all recreational amenities to be included, are subject to change shall be subject to review and approval of the City Development Services director and / or his / her designee’s. When developed, the park will be available for all city residents to enjoy.

Outdoor Lighting Guidelines
All commercial and residential development shall have uniform lighting standards with regard to style, materials, and colors in order to ensure a consistent and unified design. Lighting within each land use type, e.g., retail, office, business park, residential mixed use and residential, shall create a unified theme. Figure 6-41 provides examples of lighting fixtures that establish an overall hierarchy and visual palette that is consistent with the design theme of the Colton’s Hub City Centre Specific Plan Amendment (CHCCSP) project area.

All lighting fixtures in the CHCCSP area shall comply with the following regulations and provisions:

1. All outdoor lighting, including spotlights, floodlights, electrical reflectors, and other means of illumination for signs, structures, landscaping, parking, loading, unloading and similar areas shall be focused, directed, and arranged to minimize or adjoining property.

2. Lights shall be break-resistant plastic, recessed, or otherwise designed to reduce the problems associated with damage and replacement of fixtures.

Fixtures shall be vandal proof.

3. Neon and similar types of lighting are prohibited in all areas except in Retail areas in conjunction with the entertainment center unless otherwise approved by the Planning Commission.

4. Community entry monuments, commercial and residential entry monuments, the major entry monument and fountain at the northwest corner of Valley Boulevard and Pepper Avenue, and public plazas in the retail site should be creatively lit to develop a sense of place and arrival.

5. All exterior lighting designs shall address safety and security. Parking lots and commercial building entrances shall be well lighted for security reasons to a minimum average of one footcandle, unless otherwise approved by the police department.

6. All exterior lights should be shielded where feasible and focused to minimize spill light into the night sky or adjacent properties.

7. No freestanding lighting fixtures shall exceed forty feet (40’) in height, unless approved by the Development Services Director or his / her designee.

8. Service area lighting shall be contained within the service yard boundaries and enclosure walls.

9. All electrical meter pedestals and light switch / control equipment shall be located with minimum public visibility if possible or shall be screened with appropriate plant materials.

Page 553 of 1440 ends

Revised January 2025 6-77
Figure 6-41
Lighting Guidelines

Page 554 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-78

10. The level of on-site lighting as well as lighting fixtures shall comply with any and all applicable illumination requirements and policies of the City of Colton. Energy conservation including use of LED lighting systems should be emphasized when designing any light system.

11. All community landscape common areas, private facilities, streetscapes, and other use areas may contain accent or other night lighting elements subject to approval of the Development Services Director or his / her designee.

12. Pedestrian corridors shall be lit to ensure safe walking environments throughout the project area.

6.14 Landscape Planting Guidelines

6.14.1 Plant Material Guidelines
The quality and long-term appearance for all landscaped areas will depend on many factors including the initial selection of the plant materials, soil preparation and installation, irrigation management and care and maintenance. These guidelines apply to all public or private common areas that will be maintained by a landscape maintenance district, homeowners associations, or similar entity.

General Landscape Requirements

1. All areas required to be landscaped should be planted with turf, groundcover, shrub and / or trees selected from the plant palette contained in these guidelines or as supplemented by the City of Colton Development Services Director or his / her designee. In general, the plant materials designs should provide a layered appearance, with lower growing plants in the foreground and larger growing plants in the background.

2. Cut slopes equal to or greater than eight feet (8’) in vertical height and fill slopes equal to or greater than five feet (5) in vertical height shall be planted with a ground cover to protect the slope from erosion and instability. Slopes exceeding fifteen feet (15’) in vertical height shall be planted with shrubs spaced not more than ten feet (10’) average on center, or trees spaced not to exceed thirty feet (30’) average on center, or a combination of shrubs and trees at equivalent spacing, in addition to the groundcover. The plants selected and planting methods shall be suitable for the soil and climatic conditions.

3. Reference should be made to the City of Colton Standards for erosion control methods for slopes and other landscaped areas.

Climate
The Plant material palette has been selected based on compatibility with the climatic conditions among other considerations discussed below.

Horticultural Soils Test Requirements
Soil characteristics within the site may be variable. The developers / builders for parcels that require landscape development within public areas shall procure a horticultural soils report in order to determine proper planting and maintenance

Page 555 of 1440 ends

Revised January 2025 6-79
recommendations for proposed plant materials. Soils testing shall be performed by a qualified agricultural laboratory and shall include a soil fertility and agricultural suitability analysis with pre-planting and post-planting recommendations.

Invasive Species
Non-native invasive plant species shall not be used in landscape plans.

Plant Pest and Disease Control
Diseases and pests can have deleterious affects on one or many plants, whether native or ornamental in origin. Recent pest and disease problems include oleander scorch blight and several eucalyptus problems, requiring that these specific varieties should be avoided. Other plants that today are without known problems may develop problems in the future. While there is no way to predict the occurrence of new pests or diseases there are useful methods to limit the impact of outbreaks and should be incorporated into final design plans for each project.

These include the following:

1. Maintain optimum plant health through soil preparation, water management, and nutrient monitoring.

2. Review community plant material on a regular basis to observe health problems due to disease or pest infestation and take appropriate action.

3. Place plant material in appropriate planting areas and provide proper spacing consistent with the requirements of the plant species.

4. Place plants in similar hydro zone grouping to maximize efficient water use.

6.14.2 Plant Palette
The plant palette in Table 6.1 has been selected to create a unified and cohesive design theme for the community. Plants have also been selected for their appropriateness to climatic conditions, soil conditions, and concern for maintenance and water conservation.

Plant selections should take into consideration grouping of plants with similar cultural requirements in order to minimize water use and to provide conditions where plant material will thrive.

In the streetscape sections of the design guidelines, specific trees have been identified. In those cases, the intent is to illustrate the intended form and character that fulfills the design intent, i.e., evergreen versus deciduous, upright or vertical in form versus dome shaped. Should alternate selections be desired for any given street subject to approval by the Development Services Director or his / her designee, they should reflect the same form and character as those included in the streetscape sections. If alternates are selected for a particular street, the change shall apply to the entire streetscape for the area the change occurs and shall be approved by the Development Services Director or his / her designee.

Page 556 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-80

6.14.3 Irrigation
All landscaped areas shall be watered with a permanent underground irrigation system, designed in a manner to ensure a minimum of 100% water coverage.

The combined summer elements of heat and wind shall be taken into account to assure proper irrigation design and equipment selection.

Irrigation controllers shall have a minimum time setting of one minute and be capable of providing multiple repeat start times. All irrigation heads adjacent to walks, drives, and curbs (car overhangs) shall be of the pop-up type.

All landscaped areas shall be watered with a permanent underground irrigation system, designed in a manner to ensure a minimum of 100% water coverage.

The combined summer elements of heat and wind shall be taken into account to assure proper irrigation design and equipment selection.

Irrigation controllers shall have a minimum time setting of one minute and be capable of providing multiple repeat start times. All irrigation heads adjacent to walks, drives, and curbs (car overhangs) shall be of the pop-up type. Irrigation backflow prevention devices and controllers shall be located with mini- mum public visibility or screened with appropriate plant materials.

Water Conservation Measures

1. Drip and / or bubbler irrigation should be utilized where appropriate.

2. Use of moisture sensors and / or central control irrigation systems should be incorporated where appropriate and feasible.

3. For all areas to be publicly maintained, irrigation systems shall be designed per City guidelines.

General Requirements
Irrigation systems and plans shall be prepared pursuant to the respective landscape maintenance district guidelines and / or City of Colton ordinances.

Page 557 of 1440 ends

Revised January 2025 6-81
Table 6.1 — Plant Materials List
TREES
Botanical Name Common Name
Acacia subporosa Weeping acacia
Arbutus unedo Strawberry tree
Betula albo White birch
Brachychiton populneus Bottle tree
Cedrus deodora Deodar cedar
Cinnamonum camphora Camphor tree
Cupaniopsis Anacardioides Carrot Wood
Cupressus sempervirens Italian cypress
Eucalyptus spp. Eucalyptus
Fraxinus uhdei Evergreen ash
Koelreuteria spp. Flame tree
Lagerstroemia spp. Crape myrtle
Liquidambar styraciflua Liquidambar
Lirondendron tulipifera Tulip tree
Magnoia grandiflora Magnolia
Olea europaea (fruitless) Fruitless olive tree
Pinus spp. Pine
Pistacia chinensis Chinese pistache
Platanus acerifolia London plane tree
Platanus racemosa Sycamore
Podocarpus gracilior Fern pine
Prunus spp. Flowering peach
Pyrus spp. Ornamental pear
Quercus agrifolia Coast live oak
Quercus spp. Oak spp.

Rhus lancea African sumac
Robinia pseudoacacia Locust
Salix babylonica Weeping willow
Schinus molle California pepper
Tipuana Tipu Tipu tree
Ulmus parvifolia Chinese elm
Zelkova serrulata Sawleaf zelkova

GROUND COVERS
Botanical Name Common Name
Acacia redolens ‘desert carpet’ Dwarf trailing acacia
Arctostaphylos ‘John Dourley’ John Dourley manzanita
Ceanothus griseus hor ‘yankee point’ California lilac
Fragaria chiloenses Wild strawberry
Gazania rigens Clumping gazania
Hypericum Calycinum Hypericum
Lonicera Japonica Halls Honeysuckle
Myoporum species Myoporum
Rosemarinus officinalis species Rosemary
Turf grasses Various drought tolerant varieties

Page 558 of 1440 ends

6.0 │ COMMUNITY DESIGN GUIDELINES
Revised January 2025 6-82
Table 6.1 - Continued
SHRUBS
Botanical Name Common Name
Abelia spp. Abelia
Agapanthus sp. Lily of the Nile
Arctostaphylos sp. Manzanita
Baccharis sp. Desert broom
Ceanothus sp. California lilac
Cistus spp. Rockrose
Cotoneaster species Cotoneaster
Dietes Veseta Fortnight lily
Elaeagnus pungens Silver berry
Escallonia fradesii Pink escallonia
Euryops pectinatus No Common Name (NCN)
Feijoa sellowiana Pineapple guava
Grevillea Noelli NCN
Grewia caffra Lavender starflower
Hemerocallis species Daylily
Heteromeles arbutifolia Toyon
Iris douglasiana Douglas iris
Juniperus torulosa Hollywood juniper
Juniperus h. Bar Harbor Bar Harbor true juniper
Lavandula spp. Lavenders
Ligustrum spp. Privet
Moraea bicolor Fortnight lily
Myrtus communis True myrtle
Nandina spp. Heavenly bamboo
Ornamental grasses Fountain grass
Phormium tenax New Zealand flax
Photinia fraseri Photinia
Pittosporum tobira Mock orange
Plumbago auriculata Cape plumbago
Pyracantha species Firethorn
Rhapiolepis spp. India hawthorn
Rosa californica California wildrose
Salvia spp. Sages
Taxus baccata English yew
Tulbaghia Violacea Society garlic
Xylosma congestum Shiny xylosma
VINES
Botanical Name Common Name
Distictis buccinatoria Blood red trumpet vine
Ficus repens* Creeping fig
Grewia caffra Lavendar star flower vine
Mac Fadyena unguis-cati* Cat’s claw vine
Parthenocissus tricuspidata* Boston ivy
Wisteria floribunda Wisteria
*One of these vines shall be used on the masonry walls of trash enclosures.

Page 559 of 1440 ends

Revised January 2025 7-1
SECTION 7

ADMINISTRATION

7.0 Administration
The procedures for implementation and administration of Colton’s Hub City Centre Specific Plan (CHCCSP) are as follows:

7.1 Colton’s Hub City Centre Specific
Plan (CHCCSP) Adoption and
Applicability
The CHCCSP is a regulatory plan, which upon adoption will constitute zoning of the property. Development plans, tract or parcel maps, precise development plans or other actions requiring ministerial or discretionary approval within the boundaries of the project (except as relates to existing public school uses), must be consistent with the CHCCSP. Actions deemed to be consistent with the CHCCSP shall be deemed to be consistent with the City of Colton General Plan as mandated in California Government Code Section 65454. Should the regulations contained herein differ from the regulations of the City of Colton Zoning Ordinance, Title 18 of the Municipal Code, the regulation of the CHCCSP shall take precedence.

7.2 Implementation
The CHCCSP shall be implemented through the processing of tract maps, parcel maps, site plans, conditional use permits or related processes. The implementation process, as described below, provides the mechanism for review of these documents to assure there is development consistency with the CHCCSP goals and objectives, land use, community design and development regulations.

Page 560 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-2

7.2.1 DEVELOPMENT REVIEW PROCESS
Tentative Tract Maps, Parcel Maps and Site Plans or other applications for development within the CHCCSP area shall be submitted to the Development Services Development Services Director or his / her designee, or as otherwise determined by the Director, for review and processing for all projects. They shall be reviewed by the City for consistency with the Land Use Plan and all other provisions set forth in this document.

7.2.2 CONVEYANCE MAPS
In certain cases, there may be a need by property owners to parcelize their properties to conform to the Specific Plan land use boundaries or for other purposes. For example, one large property ownership may be designated for two or more different land uses such as retail and residential. In this case, the owner may be interested in legally dividing the parcel(s) but not be interested in developing any buildings, roads or other infrastructure at the time. In such cases, a Parcel Map or Tract Map for conveyance purposes or financing purposes, may be processed under the same application and process as a Tentative Tract Map.

However, since no building or infrastructure approvals are requested, the applicant would not be required to include any grading, sewer or water plans, other than property boundary information and related requirements, e.g., legal description, etc. In addition, no bonding or security would be required except for final monuments. For any such Maps, a condition of approval would be placed on the Map indicating it is for conveyance or financing purposes only. In all cases, the Subdivision Map Act requirements will prevail, including assurances that all parcels that are to be divided will have legal access acceptable to the City of Colton.

7.3 PROCEDURES FOR PROJECT REVIEWS,

APPROVALS, AND AMENDMENTS
The following procedures are to be used for the review and approval of development applications for individual planning areas, and to establish the requirements for making changes or additions to the Colton’s Hub City Centre Specific Plan (CHCCSP).

7.3.1 PLAN APPROVAL
The City of Colton’s development review procedures shall be employed for project implementation as described in the City of Colton Zoning Ordinance, Chapter

18.58, Administration, except as amended herein.

Housing developments in which at least 20 percent of the units are affordable to lower income households and that are located on sites that been rezoned to accommodate the lower-income RHNA shall be allowed by right. Pursuant to California Government Code Section 65583.2(i), by rights mean that no conditional use permit, planned unit development permit, or other discretionary local government review or approval that would constitute a “project” for purposes of Division 13 (commencing with Section 21000) of the Public Resources Code shall be required.

Page 561 of 1440 ends

Revised January 2025 7-3

7.3.2 DESIGN REVIEW
All projects in the CHCCSP are required to be reviewed and approved (or recommended for approval to Planning Commission) by the City Development Services Director or his / her designee (See Section 18.58.030(c)(3)) of the Municipal Code. The CHCCSP Design Guidelines and Objective Design Standards shall be used by the City of Colton’s Development Services Director or his / her designee to review each builder’s proposal for conformance with the overall community design objectives.

All projects that meet the RES-MU objective design standards and development regulations shall be processed ministerially, with the exception of projects that meet one or more of the three criteria below, for which Architectural and Site Plan Review by Planning Commission is required.
• Projects that have buildings longer than 200 feet.
• Projects that have a density greater than or equal to 31 du/ac. • Master Planned projects that are larger than 10 acres in area.

In addition to any standard City requirement for Site Plan or Design Review submittals, the following areas shall be addressed in any applicants submittal.

SITE PLANNING/LANDSCAPING

1. Building orientation / placement

2. Garage design and placement

3. Access and circulation

4. Parking areas

5. Site planning and design

6. Landscaping, private parks and open space as appropriate

7. Landscaping theme for project and for development edge

8. Plant materials that are drought tolerant

9. Fencing /screening / buffering

10. Perimeter and interior walls and fencing

11. Lighting for buildings, streets, alleys, parks or other common areas

12. Utilities and ancillary equipment

13. Fire safety access

14. Pedestrian connections

15. Streetscape design

16. Entry treatments

BUILDING DESIGN

1. Architectural styles for residential and residential mixed use (i.e., Monterey, Craftsman, etc.)

2. Architecture design and styles for commercial uses e.g., Retail, Office, Business Park, Hospitality

3. Preliminary design including elevations of all four sides of buildings

Page 562 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-4

4. Building massing, form and scale

5. Roof pitch

6. Windows and doors

7. Materials and colors

8. Signage consistent with the overall community character

9. Equipment screening

PROJECT SUBMITTAL
The findings below apply to all land use applications and are in addition to the findings required for approval of respective development applications (tract maps, architectural and site plan approvals, conditional use permits, etc.) by the City Zoning Ordinance. The findings are intended to ensure that the relationship of the proposed development layout, uses and building designs with respect to existing and future adjacent development are considered in the overall design of every land use application.

It is incumbent upon the applicant to supply the necessary materials, text and graphics to allow the City to make the required findings. The City may establish specifications for these submission requirements that augment standard City submittal requirements.

FINDINGS

1. The project complies with all provisions of the Colton’s Hub City Centre Specific Plan.

2. Areas intended for public use, such as public parks, recreational facilities and open space, are coordinated among neighborhoods and that the streetscape, landscape, hardscape and public amenities are mutually compatible.

3. The development proposal complies with the applicable community design guidelines of the CHCCSP, any applicable subsequent design guidelines and is compatible with surrounding areas, including, but not limited to building design and placement, colors, materials, height, and massing.

4. Consideration and application of public safety and security are incorporated into the project design.

5. Sustainability and conservation of resources are adequately addressed.

7.3.3 OBJECTIVE DESIGN STANDARDS FOR RESIDENTIAL MIXED

USE PROJECTS
SENATE BILL 35 (SB 25)
SB 35 requires cities and counties to streamline review and approval of eligible affordable housing projects through a ministerial process, exempting such projects from environmental review under the California Environmental Quality Act (“CEQA”). This process does not allow public hearings to consider the merits of the project; rather only design review or public oversight of the development is allowed, which must be objective and strictly focused on assessing compliance

Page 563 of 1440 ends

Revised January 2025 7-5
with criteria required for streamlined projects as well as objective design review of the project (Section 65913.4(c)(1).

SB 35 requires the availability of a streamlined ministerial approval process for multifamily residential developments in jurisdictions that have not yet made sufficient progress toward meeting their regional housing need allocation (RHNA) goal for construction of above-moderate income housing and/or housing for units below 80% area median income (AMI).

As a part of this streamlining process, cities are required to establish objective design standards for multifamily residential development. Projects eligible for SB 35 streamlining include multifamily infill developments with a portion of affordable units. They must be consistent with underlying zoning and be evidenced to have no human health impacts or impacts to natural or historical resources.

Objective design standards for projects in the Res-MU zone are located in Chapter

6.0 of this document.

SENATE BILL 330 (SB 330)
Senate Bill 330 Housing Accountability Crisis Act of 2019 provides for a faster housing project review process. It states that all A local governments must provide a preliminary application for housing development projects seeking vesting rights.

The application allows applicants to provide a limited subset of information on the proposed project. After submitting the preliminary application to the local agency, applicants have 180 days to submit a full application or the preliminary application will expire.

SB 330 also established time limits for final application review. The law states that “Not later than 30 calendar days after any public agency has received an application for a development project, the agency shall determine in writing whether the application is complete.” SB 330 provides for an applicant appeal process, and limits review of the appeal by the jurisdiction to 60 days.

APPLICABILITY
Objective Design Standards set forth in Section 6.8 apply to new Res-MU development proposals within the boundary of the Specific Plan. According to the parameters set forth by Senate Bill 35, the Streamlined Ministerial Process shall be available to proposed projects having at least 10% of units priced to be affordable to households making at or below 80% of the Area Median Income level (AMI), prior to calculating any density bonus.

The project site must meet the “infill” requirements set forth in the California Government Code Section 65913.4 and be zoned for residential or mixed-use development. The applicant must also demonstrate that the site is not within Prime Farmland, or farmland within statewide importance, wetlands, a very high fire hazard severity zone, an earthquake fault zone, special flood hazard area, protected habitat area, or a conservation easement.

Page 564 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-6

7.3.4 PLAN CONSISTENCY:

Following approval of a site plan, tract map or other application for development, (collectively referred to as the Plan) if any changes are proposed regarding the location or alteration of any use, boundary, structures or other substantive change shown on an approved Plan, a revised Plan shall be submitted to the Development Services Director or his/her designee, for approval. If the Development Services Director or his/her designee determines that the proposed revision is in substantial conformance and complies with the provisions of the CHCCSP document and the general intent of the approved Plan, the revised Plan may be approved without resubmittal to the approval process described in the above Section. Such decision shall be posted on the City bulletin board and be final unless appealed to the City Council within ten (10) days from the date of such posting.

7.3.5 MASTER PLAN REQUIRED FOR RETAIL (R), RETAIL MIXED USE (RMU), OR OFFICE MIXED USE (OMU):

Any application for R uses in Planning Areas 16, 20 or 22, RMU uses in Planning Areas 24, and Office Mixed Use (OMU) in Planning Areas 19B, 21 and 23, shall include a Master Plan for the entire respective planning area. The Master Plan shall be provided prior to building design reviews by the City. The objective of this Master Plan is to ensure that any proposed plan by an applicant for any one location or portion of a Planning Area is: 1) designed in a cohesive manner with adjacent areas, 2) provides vehicular and pedestrian access to adjacent sites and major roadways, and 3) is consistent with all Community Planning and Design Principles in Section 2.0 and other design guidelines and development regulations in other Sections of this Specific Plan. All Master Plans are subject to approval by the Planning Commission.

It is understood an applicant may not own all the properties in a given Planning Area, and / or he may not have any agreements to acquire or lease all acres within that Planning Area. In such cases, the Development Services Director or his / her designee shall determine the extent of involvement, if any, of other property owners, e.g., whether meetings with adjacent or nearby property owners are necessary. That decision shall be made on case by case basis.

For an applicant’s parcel, the Master Plan shall identify: 1) the proposed building pads and / or conceptual building footprints, 2) parking areas based on the required number of parking stalls in Section 4.0 and / or applicable city codes, and 3) the locations for vehicular and pedestrian access for ingress and egress to the subject site and to adjacent parcels and to roads shown in the Circulation Plan in Figure 4-1. For parcels in the same planning area other than those of the applicant, the Master Plan shall conceptually identify all the same elements as above. Only general areas for parking need to be shown, not parking stalls. Instead, general boundaries of parking areas may be shown.

Special features identified in the Community Design Guidelines, such as an entry monument and fountain on the corner of Pepper Avenue and Valley Boulevard, shall also be shown conceptually in the Master Plan for Planning Area 16. Within Planning Area 16, a police substation may be required in any Master Plan based on Police Department recommendations.

Page 565 of 1440 ends

Revised January 2025 7-7
It is strongly recommended that prior to filing, the applicant discuss with the Development Services Director or his / her designee, the appropriate scale of the plan and any additional information that may be required. Based on the applicants Master Plan submittal, a review by city staff shall be provided and comments submitted to the applicant. If revisions are required, the applicant shall re-submit the Master Plan to address staff comments to the satisfaction of the Development Service Director.

7.3.6 MINIMUM AND MAXIMUM RESIDENTIAL DENSITY
RANGES:

Minimum and maximum density ranges are provided for each residential land use category and are shown in Section 3.1, Table 3.2, Land Use Summary. A “Target Dwelling Unit” and “Target Density” total is also shown for each residential planning area. The Target Dwelling unit totals were based on multiplying the total acres of each planning area by the Target Density.

The total number of dwelling units (DU) proposed for any residential planning area is permitted to have fewer units than shown in Table 3.2, Planning Area Summary, under “Target DU” and may be less than the Target Density.

The total number of dwelling units proposed for any planning area may or may not be permitted to have a greater number of DU than the “Target DU” number.

Provisions for exceeding the Target DU require an additional step described below under density transfers. Projects in the RES-MU zone are exempt from the provisions of the target density transfer.

In all cases, the total DU for any planning area may not exceed the maximum density permitted of the respective land use category. For example, 118 DU is the Target for PA 2 and 158 is the maximum number of DU permitted. This maximum number is determined based on multiplying the total site net acres by the maximum density of 14 du / ac. (11.3 acres x 14 du / ac.) Should the total requested dwelling units by an applicant exceed the “Target DU”, however, a request for greater than the target number of dwelling units requires additional steps as described below under Target Density Transfers (TDT) in order to assure the total CHCCSP does not exceed its permitted maximum total of 4,156 dwelling units.

TARGET DENSITY TRANSFER:

A “Target Dwelling Unit (DU)” total is included for each residential Planning Area in Section 3.0, Table 3.2, Planning Area Summary. The maximum permitted DU in the CHCCSP is 4,156. During the site planning and / or tentative tract map stages of design, the actual number of dwelling units requested by an applicant within a particular planning area may differ from the target number shown in the Planning Area Summary. The total number of dwelling units for any individual planning area may exceed the “Target DU” subject to the following conditions:
 The written approval of the property owner(s) or their designated representative of the planning area(s) affected by a commensurate reduction in the target number of dwelling unit totals must be provided. However, if said property owner(s) previously submitted an application which includes

Page 566 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-8
fewer dwelling units than is included in the “Target” number of that property owners respective residential planning area(s), and such application was approved by the Planning Commission, then such approval of the application shall be deemed as that owner’s approval.
 In such cases, the planning area for which an approval was granted by the Planning Commission, shall be deemed to be the new final total permitted dwelling units in that planning area. In this case the Development Services Director or his / her designee shall have the discretion to assign the unused dwelling units to any other residential planning area.
 The assignment of dwelling units to another residential planning area shall be based upon a first come first served basis, providing: 1) a completed application in accordance with city requirements is submitted by the owner or his authorized representative to the City that specifies the total dwelling units requested, 2) it meets all development regulations and other applicable standards and guidelines of this Specific Plan and, 3) it is approved by the Director of Development Services.
 Within ninety (90) days of said acknowledgment by the Development Services Director or his / her designee, the applicant shall submit a tentative tract map and site plan pursuant to all City requirements. If such tentative tract map is not submitted or is deemed incomplete, the Development Services Director or his / her designee shall, in his or her sole discretion, be able to assign any unused dwelling units to the next applicant requesting an increase with the same provisions.

7.3.7 COMMERCIAL BUILDINGS – PERMITTED TOTAL SQUARE
FEET:

Each planning area designated for all commercial Retail, Office, Business Park, Hospitality uses contains a projected amount of building square footage which is included in the CHCCSP EIR Traffic Study. During the refined site planning and tract map stages of design, the actual amount of square feet requested by an applicant in a particular commercial planning area may differ from the amount shown in the Traffic Study. If an increase to the square feet of gross building area exceeds the total listed in the Traffic Study within a planning area, the Development Services Director or his / her designee may permit such an increase up to five percent of the total allocation provided in the Traffic Study. Increases above the five percent shall require approval of the Planning Commission. In all cases where changes are requested to increase the projected amount of square feet in any planning area, the Development Services Director or his / her designee shall determine whether subsequent environmental review and/or studies are required, including but not limited to traffic studies and acoustical studies.

7.3.8 SPECIFIC PLAN AMENDMENTS:

Amendments may be requested at any time pursuant to Section 65453(a) of the Government Code. If the Development Services Director or his / her designee deems the Amendment major, it will be processed in the same manner as the original Specific Plan.

Page 567 of 1440 ends

Revised January 2025 7-9
Depending upon the nature of the proposed Specific Plan Amendment, a supplemental environmental analysis may be required, pursuant to the California Environmental Quality Act (CEQA), Section 15162. If required, it is the applicant’s responsibility to provide an analysis of the impacts of the amendment relative to the original EIR.

7.3.9 FINDINGS FOR APPROVAL OF SPECIFIC PLAN
AMENDMENTS:

In considering approval or disapproval of Specific Plan Amendments, the City Council shall find that the proposed Amendment is in compliance with the following:

1. The proposed Amendment is consistent with the General Plan and its Elements in effect at the time of submission.

2. The proposed Amendment does not result in an incompatibility with surrounding land uses with respect to use, development standards, density, or issues of health, public safety or general welfare.

3. The proposed Amendment is consistent with the overall design character and general community structure of CHCCSP.

4. The proposed Amendment, with appropriate mitigation measures, is not likely to increase environmental impacts beyond those identified and mitigated in the EIR, or substantially and avoidably injure significant wildlife, or their habitat.

7.3.10 MINOR MODIFICATIONS:

The following minor modifications to the CHCCSP do not require a Specific Plan Amendment but are still subject to review and approval by the Development Services Director or his / her designee. The Development Services Director or his/her designee shall, however has the discretion to refer any such request for modification to the Planning Commission.

1. Final facility sizing and precise location of water, sewer and storm drainage improvements when directed by the City Engineer and Director of Water / Wastewater.

2. Change in utility and / or infrastructure servicing agency.

3. Arterial, collector or local road alignment revisions when the centerline moves by less than one hundred feet (100’) providing the planning areas that are affected do not change more than five percent in total area.

4. Alignment of pedestrian walks and / or off-street bike lanes.

5. Decrease in project density for up to one land use category. For example the RES-M1 category (5.1 to 14 du / ac.) may be reduced to Res M (0-5 du / ac.). In such a case the development standards for the reduced land use category shall apply.

6. Adjustment of individual planning areas so long as the total acreage of that planning area does not decrease or increase by generally more than five percent of the stated acres within the CHCCSP.

Page 568 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-10

7. Minor landscape changes with respect to plant material types, wall materials and general locations.

8. Modifications to Community Design Guidelines, with respect to minor variations within the particular architectural style, landscape features, plant palette, walls and entry monuments, subject to review by the Development Services Director.

9. Changes in park and recreation facilities, subject to concurrence by the Development Services Director.

10. Specific modifications of a similar nature to those listed above, which the Development Services Director or his / her designee deems minor, which are in keeping with the intent of the CHCCSP and which are in conformance with the General Plan, subject to concurrence by the Community Services Director.

7.3.11 EFFECTIVE DATE:

All Amendments per this Section adopted by ordinance shall take effect thirty (30) days after adoption of the second reading by the City Council.

7.4 NONCONFORMING STRUCTURES AND LOTS

7.4.1 PURPOSE AND INTENT
This section establishes uniform provisions for the regulation of legal nonconforming uses, structures and lots. Within the zoning districts established by this CHCCSP, certain land uses and structures were legally established under the requirements of the Colton Municipal Code or prior specific plans that may be prohibited, regulated, or restricted differently under the terms of this Specific Plan Amendment or any subsequent amendments of it.

The CHCCSP discourages the long-term continuance of these nonconformities and encourages their abatement. However, this Specific Plan Amendment includes provisions to permit these nonconforming uses to be expanded or redeveloped if certain conditions are met. Nonconforming uses and structures shall not be enlarged, expanded, or extended, except as expressly stated in this section, nor shall the existence of a nonconforming use or structure be a determining factor for adding other uses or structures allowed in the same land use district.

7.4.2 DEFINITIONS
The following definitions shall be applicable:

Nonconforming. “Nonconforming” means a building, structure or portion thereof, or use of building or land which does not conform to the regulations of this specific plan and which lawfully existed at the time the regulations became effective through adoption, revision or amendment
Nonconforming lot. “Nonconforming lot” means a lot, the area, dimensions or location of which was lawful prior to the adoption, revision or amendment of this specific plan, but which fails by such reason to conform to the present requirements of the specific plan.

Page 569 of 1440 ends

Revised January 2025 7-11
Nonconforming structure. “Nonconforming structure” means a structure or building, the size, dimensions or location of which was lawful prior to the adoption, revision, or amendment of this specific plan, but which fails by such reason to conform to the present requirements of the specific plan.

Nonconforming use. “Nonconforming use” means a use or activity which was lawful prior to the adoption, revision or amendment of this specific plan, but which fails by such reason to conform to the present requirements of the specific plan.

7.4.3 NONCONFORMING USES
A nonconforming use shall be subject to the provisions contained in this section:

1. A nonconforming use may be altered, subject to the approval of the Development Services Director or his / her designee. The Director shall have the discretion to approve uses that are expanded or modified by less than ten per cent (10%) of the lawful floor space or ground area existing at the time the use became nonconforming.

2. For a nonconforming use of land not involving a structure, the use may not be moved, in whole or in part, from the location it occupied at the time the use became nonconforming to any other portion of the lot or parcel upon which it is located, unless there exists proof of intent to occupy such area or location on the lot or parcel prior to the time the use of land became nonconforming. Expansions or modifications of ten per cent (10%) or greater shall be referred to the Planning Commission.

3. If no structural alterations are proposed, a nonconforming use of a structure may be changed to another nonconforming use of lesser intensity, or closer to conformity with the underlying designation, provided the Director determines that the proposed use is of lesser intensity or more appropriate to the land use district than the existing nonconforming use. In permitting such a change, the Director may impose conditions to ensure that the degree of nonconformity is not subsequently increased, along with such other conditions as are necessary to mitigate any adverse impacts of the changed use upon neighboring properties.

4. If a nonconforming use is superseded by an allowed use, such use shall thereafter conform to the regulations for the land use district in which it is located, and the nonconforming use may not be resumed.

7.4.4 NONCONFORMING STRUCTURES
A nonconforming structure may be continued in use so long as it is in compliance with all codes, ordinances and laws of the City and, other than building code regulations as set forth in the Colton Municipal Code, subject to the following provisions:

1. If a nonconforming structure or nonconforming portion of a structure is destroyed by any means to an extent of more than fifty percent (50%) of its reasonable replacement value at the time of destruction, it may not be reconstructed except in conformity with the provisions of this Specific Plan Amendment.

Page 570 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-12
Exception: a nonconforming residential structure may be reconstructed in any district that allows such a use if it meets all building and safety regulations, and if, to the extent reasonable and feasible, the construction conforms with the regulations of this Specific Plan.

2. If a structure is moved for any reason for any distance, it shall thereafter conform to the regulations for the land use district into which it is relocated.

3. If a nonconforming structure is abandoned or vacated for one-hundred eighty days or more, any subsequent use of the property shall conform with the regulations of the land use district in which it is located.

4. The provisions of this section shall not apply to billboards.

Nonconforming billboards shall be terminated in accordance with applicable provisions of the California Outdoor Advertising Act and the Colton sign code.

7.4.5 NONCONFORMING LOTS
Any lot that becomes nonconforming upon adoption of this Specific Plan may be used or built upon, provided that the development project otherwise conforms to the requirements of this Specific Plan.

SPECIFIC PLAN AMENDMENT
Any lot that, by action of the City of Colton or any other government agency, becomes nonconforming by means of condemnation, acquisition, or dedication shall be allowed to apply the standards for the lot in effect prior to the agency action.

7.4.6 OTHER NONCONFORMITIES
This section shall apply to any other circumstance which does not conform to the requirements of this Specific Plan including, but not limited to, nonconforming fence heights or location; lack of buffers or screening; lack of or inadequate landscaping; lack of or inadequate off-street parking; and any other nonconformity created by adoption of this Specific Plan. Because nonconformities addressed in this section involve less investment and are more easily corrected than those addressed in Sections 7.3, 7.4 or 7.5 of this section, the intent of this Specific Plan is to eliminate such nonconformities as quickly as practicable. The following shall apply:

1. Non-conforming development with approved site plan or conditional use permit. A non-conforming development that is consistent with a site plan or conditional use permit approved before the effective date of this Specific Plan shall be deemed to be in conformance with this Specific Plan to the extent that it is consistent with the approved site plan and to the extent that such development conforms to all conditions imposed thereon.

A nonconformity, other than one of those enumerated in Sections 7.4.3,

7.4.4 or 7.4.5 of this section, shall be brought into conformance upon the occurrence of any one of the following:

Page 571 of 1440 ends

Revised January 2025 7-13
a. Any increase of more than fifteen (15) percent floor area or fifty (50) percent value of the building or premises.
b. For a lot or parcel located in a commercial or industrial zone, any change in use to a more intensive use when a new certificate of occupancy is requested.

2. In no event shall the extent of such nonconformities be increased or expanded.

7.4.7 REPAIRS AND MAINTENANCE
On any nonconforming structure, and on any conforming structure containing a nonconforming use, routine maintenance work may be performed, and nonbearing walls, fixtures, wiring, or plumbing may be repaired or replaced; provided that:

1. The value of the repair and replacement work during any twelve-month period does not exceed ten percent of the replacement cost of the entire structure; and

2. The square footage of the structure that is nonconforming or has a nonconforming use is not increased.

7.4.8 ABANDONMENT
Any nonconforming use, structure, or other nonconformity which is not thus occupied or so used for a continuous period of one hundred eighty days (6 months) shall be deemed abandoned and shall not thereafter be re-occupied or used except in a manner that conforms to the requirements of this specific plan.

1. Presumption of Abandonment. A nonconforming use, structure, or other nonconformity shall be presumed abandoned when any of the following occurs:
a. The owner or authorized representative has in writing or by public statement indicated intent to abandon the use, structure, or other nonconformity; b. A less intensive use has replaced the original nonconforming use; c. The owner or authorized representative has physically changed the structure or its permanent equipment in such a way as to indicate a change in use or activity to something other than the nonconforming use; or
d. The structure has been removed through applicable procedures for the condemnation of unsafe structures.
e. Electric utility service has been terminated for 180 days or more.

2. Overcoming Presumption of Abandonment. A presumption of abandonment may be rebutted upon evidence presented by the owner or authorized representative showing no intent to abandon the use, structure, or other nonconformity. Such evidence may include proof that

Page 572 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-14
during the alleged period of abandonment the owner or authorized representative has done either of the following:
a. Maintained the lot and structure, if any, in accordance with the building code; or
b. Has actively and continuously marketed the lot or structure for sale or lease.

7.4.9 DETERMINATION OF NONCONFORMING STATUS
In all cases where the nonconformity of a use, structure or lot is at issue, the property owner or authorized representative shall have the burden of establishing that a nonconforming lot, structure, or use lawfully exists pursuant to laws applicable at the time it was established or constructed.

7.4.10 NONCONFORMING USES DETRIMENTAL TO HEALTH AND
SAFETY
No provisions of this section or this specific plan shall be construed to allow the continuance of any nonconforming structure or use when it is detrimental to the health, safety, or welfare of the public.

7.4.11 APPEALS
Any person aggrieved by a decision of the Director other official enforcing the provisions of this section may appeal to the Planning Commission.

7.5 ENFORCEMENT

PURPOSE AND INTENT
This section establishes provisions for the enforcement of all provisions, standards, regulations, and guidelines in the CHCCSP. It is intended to provide the City with flexibility in determining appropriate remedies to use in case of any violation. As a result, all herein described penalties are cumulative in nature.

DECLARATION OF UNLAWFULNESS AND PUBLIC NUISANCE
Any building, structure or other improvements set up, erected, constructed, altered, enlarged, converted, moved or maintained contrary to the provisions of this Specific Plan, any use of land, building, or premises established, conducted or operated or maintained contrary to the provisions of this Specific Plan shall be and the same is declared to be unlawful and a public nuisance. Upon a request by the Director, the City Attorney shall immediately commence action or proceedings for the abatement and removal and the enjoining thereof in the manner prescribed by law, and shall take such other steps and shall apply to such courts as may have jurisdiction to grant such relief as will abate and remove the structure or building or use, and enjoin any person, firm or corporation from setting up, erecting, building, maintaining or the use of any such building or structure or using property contrary to the provisions of this title. The remedies provided herein shall be cumulative and not exclusive.

Page 573 of 1440 ends

Revised January 2025 7-15

CITATION AUTHORITY
The Chief of Police and his / her authorized designees are authorized to issue a citation for an infraction or misdemeanor as to such violation after such notice if there is neither correction nor compliance.

VIOLATIONS AND PENALTIES
Any person violating any of the provisions of this Specific Plan shall, unless otherwise specifically provided in this Specific Plan or by statute, be guilty of a misdemeanor; provided, that where the City Attorney or other prosecutor determines that such action would be in the interests of justice, the City Attorney or other prosecutor may prosecute any such offense as an infraction. In the event a notice to appear is prepared as a misdemeanor, the City Attorney or other prosecutor may nonetheless prosecute any such offense as an infraction.

USE OF ADMINISTRATIVE FINES AND PENALTIES
Notwithstanding the use of criminal citations filed as infractions or misdemeanors, every violation of a provision of this Specific Plan, the penalty for which is defined as an “infraction” or “misdemeanor,” shall also be subject to an administrative fine and penalty in accordance with the provisions of Chapter 8.12 of the Colton Municipal Code. The use of administrative fines and penalties are in addition to all other remedies, criminal or civil, which may be pursued by the city to address any violation of provision, standard, regulation, guideline, rule or other law adopted by the city, or other applicable state codes. Use of this chapter shall be at the sole discretion of the City and nothing in this chapter shall prevent the City from initiating a civil, criminal or other legal or equitable proceedings as an alternative to the proceedings set forth in this Specific Plan.

7.6 DEFINITIONS
Refer also to the City of Colton Zoning Ordinance, Title 18 of the Municipal Code, for definitions. The following definitions shall also apply to the Colton’s Hub City Centre Specific Plan area and supercede those in the Zoning Ordinance.

Acreage, Net: that area of a lot or parcel less public rights-of-way and public dedicated open space or other public use.

Alley: a public or private service way providing access to property and not intended for general traffic circulation.

CEQA: The California Environmental Quality Act.

Common Area: that area of a lot or parcel held in common and / or single ownership and not reserved for the exclusive use or benefit of an individual tenant or owner.

Common Open Space: all common landscape areas, private recreation areas, private pedestrian corridors and private streets within a lot or parcel that is controlled and maintained by a homeowners association.

Defensible Space: a physical space which is made usable and safe by means of a design encouraging pedestrian circulation, visual access and the elimination of visually obstructed areas.

Page 574 of 1440 ends

7.0 │ ADMINISTRATION
Revised January 2025 7-16
Detention Basin: a pond, pool or basin used for the temporary storage of water runoff.

Development Agreement: a legally binding instrument executed between two or more parties which sets forth the specific criteria under which a certain development project may proceed. Modifications to the terms and conditions of the agreement require the mutual written consent of all parties entering into the agreement.

Drive-thru Facility: a facility synonymous with “drive in business” in the City Zoning Ordinance.

Façade: means the exterior wall of a building exposed to public view or that wall viewed by persons outside the building.

Guest Parking: on-site parking spaces provided for intermittent use by visitors.

Infrastructure: basic facilities and services needed to sustain residential and commercial activities including, but not limited to, sewer, water, storm drain, and streets.

Land Use Plan: a plan showing proposed location, extent and intensity of development of land to be used in the future for varying types of residential, commercial, industrial, agricultural, recreational, educational and other public and private purposes or combination of purposes.

Live / Work Unit: A single-family dwelling unit which contains adequate work space typically accessible from separate entrance reserved for, and regularly used by, one (1) or more persons residing therein.

Minimum Parcel Area: the minimum amount of land that must be contained in a parcel for development purposes.

Mixed Use: the development of a tract of land or building or structure with two or more different uses such as, but not limited to, residential, office, manufacturing, retail, public, or entertainment, in a compact urban form.

Open Space: Any parcel or area of land or water and set aside, dedicated, designated, or reserved for public or private use or enjoyment of owners, occupants and guests.

Open Space, Common: land within or related to a development, not individually owned or dedicated for public use, which is designed and intended for the common use or enjoyment of the residents or tenants of the development.

Open Space, Private: an open space, fenced or otherwise, which is reserved normally for the exclusive use by the occupants of a single dwelling or building or property.

Open Space, Public: an open space owned by a public agency and maintained by it for the use and enjoyment of the general public.

Planning Area: a specifically delineated area or district within a Specific Plan with development regulations and standards that uniformly govern the use, placement, spacing and size of land and buildings.

Page 575 of 1440 ends

Revised January 2025 7-17
Project: means the total development within the boundaries as defined on the development plan.

Retention Basin: a pond, pool or basin used for the permanent storage of water runoff.

Shared Parking: a situation where the same parking spaces can be utilized by two or more different uses due to the differing peak hours of operation of the uses involved.

Site: means any plot or parcel of land or combination of contiguous lots or parcels of land.

Temporary Use: a use established for a fixed period of time with the intent to discontinue such use upon the expiration of the time period.

Tot Lot: an improved and equipped play area for small children.

Use, Conditional: a use, listed by the regulations of any particular district as a conditional use within that district and allowable therein, solely on a discretionary and conditional basis, subject to development/design review or to a conditional use permit, and to all other regulations.

Zero Lot Line: the location of a building on a lot in such a manned that one or more of the building’s sides rest directly on a lot line.

Page 576 of 1440 ends

Item: 1.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Isaac T. Suchil, City Clerk
Item Name: Minutes - Approval of Minutes for the City Council Regular Meetings Held on May 20, 2025 and June 17, 2025, on File in the Office of the City Clerk.

Recommended Action:

Approval of Minutes for the City Council Regular Meetings held on May 20, 2025 and June 17, 2025.

Background:

Minutes for the City Council Regular Meetings held on May 20, 2025 and June 17, 2025.

Issues/Analysis:

None
Fiscal Impacts:

None
Alternatives:

None
Attachments:

1. 2025-05-20 -Draft Minutes

2. 2025-06-17 - Draft Minutes

Page 577 of 1440 ends

1 CITY OF COLTON
City Hall, Council Chambers
650 N. La Cadena Drive
Colton, CA 92324
Website: www.coltonca.gov
Mayor Frank J. Navarro
Council Members:

David J. Toro – District 1
Kelly J. Chastain – District 2
Dr. Luis S. Gonzalez – District 3
John R. Echevarria – District 4
City Clerk Isaac T. Suchil
City Treasurer Henry M. Razo
City Manager William R. Smith
City Attorney Carlos Campos

REGULAR MEETING MINUTES

CITY COUNCIL,

COLTON UTILITY AUTHORITY, COLTON PUBLIC FINANCING

AUTHORITY,

COLTON HOUSING AUTHORITY

REGULAR MEETING
TUESDAY, MAY 20, 2025 – 5:00 P.M.

CITY HALL, COUNCIL CHAMBERS
CLOSED SESSION - 5:00 p.m.

Closed Session Meeting held on the above given date at 5:00 p.m., in the Council Chamber of City Hall, with Mayor Navarro presiding.

CITY COUNCIL ROLL CALL
Councilmembers present were MPT Toro, CM Chastain, CM González, CM Echevarria and Mayor Navarro.

CLOSED SESSION PUBLIC COMMENT – None

CLOSED SESSION
City Attorney Campos announced that the City Council would meet in Closed Session to Discuss Items A and B.

Mayor Navarro adjourned the meeting to Closed Session at 5:01 p.m.

A. CONFERENCE WITH LABOR NEGOTIATORS
Pursuant to Government Code Section 54957.6
Agency Designated Representatives: Bill Smith, City Manager Employee Groups: Teamsters - General Employees

Page 578 of 1440 ends

2 Teamsters - Mid-Manager Employee Association
International Brotherhood of Electric Workers, Local 47 - Electric Division International Brotherhood of Electric Workers, Local 47 - Water/Wastewater Division
Colton Police Officers Association (CPOA)
Colton Police Management Association (CPMA)
Colton Police Dispatchers Association (CPDA)
Colton Police Civilian Employee Association (CPCA)
Colton Firefighters Association (CFA)
Confidential Employees Group
B. CONFERENCE WITH REAL PROPERTY NEGOTIATORS (Section 54956.8)) Property: APN 0276-144-55 & 0276-144-54
Agency Negotiator: Bill Smith, City Manager
Negotiating Parties: MGR Real Estate
Under Negotiation: Price and Terms of Payment
City Attorney Reports/Reportable Action
City Attorney Campos announced that the City Council met in Closed Session and discussed Items A and B; direction was given, but there was no reportable action.

OPEN SESSION
Regular Meeting held on the above-given date at 6:00 p.m. in the Council Chamber of City Hall, with Mayor Navarro presiding.

INVOCATION Pastor Dane Aacker, Center Point Church.

FLAG SALUTE Veterans of Foreign Wars (VFW) Commander Bernie Moyeda

CITY COUNCIL ROLL CALL
Council Members Present Staff Present
Frank J. Navarro, Mayor William R. Smith, City Manager
David J. Toro, MPT Carlos Campos, City Attorney
Kelly J. Chastain Isaac T. Suchil, City Clerk
Dr. Luis S. González
John Echevarria Absent
Henry M. Razo, City Treasurer

CEREMONIAL MATTERS
• Proclamation - Colton Student Leadership Day
CM González read a proclamation establishing May 20, 2025 as Colton Student Leadership Day, and then presented recognition certificates, on behalf of the Mayor and City Council, as well as recognition certificates from San Bernardino County Supervisor Joe Baca Jr. to the following students:

Page 579 of 1440 ends

3 • Sarah Bautista
• Anthony Castellanos
• Kaeley Diaz
• Hailey Dubon
• Emily Estrada
• Sienna Fernandez
• Alejandra Gomez
• Joceline Lopez
• Ash Mendoza
• Edith Orta
• Ignacio Parra
• Ghael Resaid Pasos
• Abel Perez
• Emily Perez
• Melany Jimenez Prado
• Anthony Reveles
• Genesis Rodela Uriarte
• Recognitions – Colton High School SoCal STEAM Challenge Participants Jessica Sutorus, Environmental Conservation Supervisor, and Cecilia Griego, Senior Water Conservation Specialist and 2025 Chair of the So Cal STEAM Challenge Committee, presented recognition certificates to following students for their participation in the Colton High School SoCal STEAM Challenge:
• Hiliana Serrano
• Ezra Ochoa
• Izak Landero
• Elizabeth Hernandez
• Tommy Lopez
• Cristian Heredia
• Diana Ruvalcaba
• David Olvera
• Adrianna Silva
• Leilanee Gomez

MAYOR AND COUNCIL DISCLOSUER ITEMS

GIFT DISCLOSURES - NONE
AB 1234 ORAL REPORTS:

MPT Toro and CM Echevarria attended the 2025 International Council for Shopping Centers’s (ICSC) conference, which was held on May 18th-20th in Las Vegas, Nevada.

Mayor Navarro and CM González attended the 2025 San Bernardino County Transportation Authority’s (SBCTA) City County Conference, which was held May 8th-9th at Lake Arrowhead Resort, CA.

APPOINTMENTS
Recreation and Parks Youth Commissioner - Ava Diaz
A consensus was reached by the Council to appoint Ava Diaz to the Recreation and Parks Commission as a Youth Commissioner.

MAYOR AND COUNCIL DISCUSSION ITEMS – None

Page 580 of 1440 ends

4 PUBLIC HEARINGS
(1) Public Hearing - LRA Fire Hazard Severity Zones - TIME AND PLACE FIXED

TO CONSIDER A PUBLIC HEARING TO INTRODUCE BY TITLE ONLY AND WAIVE THE FULL READING OF ORDINANCE O-06-25, AN

ORDINANCE OF THE CITY COUNCIL OF THE CITY OF COLTON,

CALIFORNIA, ADOPTING LRA FIRE HAZARD SEVERITY ZONES,
ORDINANCE NO. O-06-25. A power point was presented to Council by Ray Bruno, City of Colton Fire Chief.

Mayor Navarro announced the Public Hearing Open.

The City Clerk submitted the Affidavit of Publication and reported that no protests or objections thereto, and no letters of objection for this item were received.

Public Comment - None
A Motion was made by CM Echevarria, and a second by CM González, to close the Public Hearing.

Vote: Unanimous, Motion Passed.

Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provided by staff: Battalion Chief/ Fire Marshall, Jon Boggs.

Motion and Second by Council Member González / Council Member Chastain to waive full reading of Ordinance No. O-06-25 to adopt LRA fire hazard severity zone(s).

Vote: Unanimous, Motion Passes
BUSINESS ITEMS - None
PUBLIC COMMENT – (public comment can be viewed and heard at www.coltonca.gov) Darlene M. Bush-Lobato, Colton Woman’s Club
Erica LaGay, Reche Canyon resident. (Submitted a letter to Colton City Council as she was not able to attend the meeting and asked that it be placed in the minutes.)

CONSENT CALENDAR
Mayor Navarro presents the Consent Calendar Items 2 through 20.

Motion and Second by CM Echevarria/CM González to approve the consent calendar as presented.

Vote: Unanimous, Motion Passes with Council Member Chastain & Council Member

Page 581 of 1440 ends

5 Echevarria voting no on item 15.
(2) Minutes - Approval of Minutes for the City Council Special Meeting Held on April 28, 2025, on File in the Office of the City Clerk.
[City Clerk: Isaac T. Suchil]
(3) Warrants - Approve US Bank voucher dated 03/20/2025 and totaling $79,256.75; voucher numbers 218824 to 218938 dated 04/17/2025 and totaling $1,570,974.39 and voucher numbers 218939 to 219068 dated 04/24/2025 and totaling $3,420,797.59.
[Staff Person: Stacey Dabbs]
(4) Bid Rejection - La Loma Reservoir Project - Reject All Bids for the La Loma Reservoir Project. [Staff Person: Chad Blais]
(5) Change Order - Estate Design and Construction - Approve Change Order #1 to Contract with Estate Design and Construction for the Water Department Restroom Remodel Project. [Staff Person: Chad Blais]
(6) Change Order - Unlimited Environmental Inc. - Approve Change Order #1 to the Contract with Unlimited Environmental, Inc. for Rialto Tank Demolition Project. [Staff Person: Chad Blais]
(7) Contract Amendment - Krieger and Stewart, Inc. - Approve Contract Amendment with Krieger and Stewart, Inc. for Engineering Design & Construction Services. [Staff Person: Chad Blais]
(8) Contract Award - CASC Engineering - Approve 2025 Contract with CASC Engineering to Provide On-Call Environmental Consulting Services.
[Staff Person: Heidi Duron]
(9) Contract Award - Kimley-Horn & Associates - Approve 2025 Contract with Kimley-Horn & Associates to Provide On-Call Environmental Consulting Services. [Staff Person: Heidi Duron]
(10) Contract Award - Matich Corp - Approve Contract Award to Matich Corporation for the Fiscal Year 2024-2025 Asphalt Paving Project and Approve and Adopt a Resolution Amending the Fiscal Year 2024-2025 Capital Improvement Budget, RESOLUTION NO. R-30-25. [Staff Person: Chad Blais]
(11) Contract Award - SWC Contracting - Approve Contract Award to SWC Contracting for the Equipping of Well Plant No. 33 Project and Corresponding Budget Resolution, RESOLUTION NO.

R-34-25.
[Staff Person: Chad Blais]
(12) Contract Inspection Services - TKE - Approve a Contract with TKE Engineering Inc., for Inspection Services for the Well 22 and 33 Construction Projects.
[Staff Person: Chad Blais]
(13) Cooperative Agreement Amendment - San Bernardino County Transportation Authority - Approve Amendment No. 2 to Second Amended and Restated Cooperative Agreement No.18-1001904-05 with the San Bernardino County Transportation Authority (SBCTA) for the I-10/ Mt. Vernon Avenue Interchange Project (Project), RESOLUTION NO. R-31-25.
[Staff Person: Chad Blais]
(14) Emergency Condition - Agua Mansa Power Plant - Confirm Ongoing Emergency Condition at Agua Mansa Power Plant.
[Staff Person: Charles Berry]
(15) FY2025-26 Budget Adoption - Approve and Adopt the Fiscal Year 2025-26 Budget and the Annual GANN Limit for FY2025-26, RESOLUTION NO. R-32-25, R-33-25, CHA-02-25, CUA-02-25. [Staff Person: Stacey Dabbs]

Page 582 of 1440 ends

6 (16) Notice of Completion - Citywide Roofing Tile Replacement Project - Approve the Execution and Recordation of the Notice of Completion for the Citywide Roofing Tile Replacement Project. [Staff Person: Chad Blais]
(17) Property Purchase - M Street - Approve and Adopt a Resolution Approving the Purchase of the M Street Property for $900,000, RESOLUTION NO. R-106-24.
[Staff Person: Tom Welch]
(18) Purchase - Sherman & Reilly - Approve Purchase of TRT-184/160 Single Turret Trailer from Sherman & Reilly.
[Staff Person: Charles Berry]
(19) Purchase - Sherman & Reilly - Approve Purchase of One DDHXA-75 Duct Dawg Trailer from Sherman & Reilly.
[Staff Person: Charles Berry]
(20) 2025-2028 Pre-Qualified List - Environmental Consultants - Approve and Adopt a Resolution Approving the 2025-2028 Environmental Consultants Pre-Qualified List, RESOLUTION NO. R-29-

25. [Staff Person: Heidi Duron]

MAYOR AND COUNCIL ORAL REPORTS AND COMMENTS
Council and Mayor comments can be viewed and heard at www.coltonca.gov.

CITY MANAGER'S REPORTS – None

ADJOURNMENT
Council Meeting was adjourned at 7:03p.m. with a moment of silence for Rachel Warner, Ramon Anthony Aguilar, Anita H Mascorro, Jhonnie Studardo Reyes Hernandez, Lourdes Rodriguez-Reyes, Francisco Cacho.
___________________________
Isaac T. Suchil
Colton City Clerk

Page 583 of 1440 ends

1 CITY OF COLTON
City Hall, Council Chambers
650 N. La Cadena Drive
Colton, CA 92324
Website: www.coltonca.gov
Mayor Frank J. Navarro
Council Members:

David J. Toro – District 1
Kelly J. Chastain – District 2
Dr. Luis S. Gonzalez – District 3
John R. Echevarria – District 4
City Clerk Isaac T. Suchil
City Treasurer Henry M. Razo
City Manager William R. Smith
City Attorney Carlos Campos

REGULAR MEETING MINUTES

CITY COUNCIL,

COLTON UTILITY AUTHORITY, COLTON PUBLIC FINANCING

AUTHORITY,

COLTON HOUSING AUTHORITY

REGULAR MEETING
TUESDAY, JUNE 17, 2025 – 5:00 P.M.

CITY HALL, COUNCIL CHAMBERS
Closed Session Meeting held on the above given date at 5:00 p.m., in the Council Chamber of City Hall, with Mayor Navarro presiding.

CITY COUNCIL ROLL CALL
Councilmembers present were MPT Toro, CM Gonzalez, CM Echevarria and Mayor Frank J. Navarro; CM Chastain was absent and excused.

PUBLIC COMMENT - Closed Session - None

CLOSED SESSION
City Attorney Campos announced the City Council would meet in Closed Session to discuss Items A and B.

A. CONFERENCE WITH LABOR NEGOTIATORS
City Representatives: Bill Smith, City Manager & Tom Cody, HR Director Employee Groups: Teamsters - General Employees
Teamsters - Mid-Manager Employee Association
International Brotherhood of Electric Workers, Local 47 - Electric Division

Page 584 of 1440 ends

2 International Brotherhood of Electric Workers, Local 47 - Water/Wastewater Division
Colton Police Officers Association (CPOA)
Colton Police Management Association (CPMA)
Colton Police Dispatchers Association (CPDA)
Colton Police Civilian Employee Association (CPCA)
Colton Firefighters Association (CFA)
Confidential Employees Group
B. PUBLIC EMPLOYEE PERFORMANCE EVALUATION
Job Title - City Manager
Mayor Navarro adjourned the meeting to Closed Session at 5:05 p.m. and the meeting reconvened with all members being present at 6:00 p.m.

City Attorney Campos announced that the City Council met in Closed Session and discussed Items A and B; there was no reportable action.

OPEN SESSION
Open Session Meeting held on the above given date at 6:00 p.m. in the Council Chamber of City Hall, with Mayor Navarro presiding.

INVOCATION Pastor Scott Thibodo - Centerpoint Church
FLAG SALUTE Veterans of Foreign Wars (VFW) Commander Bernie Moyeda

CITY COUNCIL ROLL CALL
Councilmembers present were MPT Toro, CM González, CM Echevarria and Mayor Navarro; CM Chastain was absent and excused.

STAFF PRESENT
City Manager Smith, City Attorney Campos, and City Clerk Isaac T. Suchil; City Treasurer Henry M. Razo was absent.

CEREMONIAL MATTERS
• Proclamation - Parks and Recreation Month
Mayor Navarro read a proclamation declaring July as Parks and Recreation Month.

The Mayor presented the proclamation to Heidi Struts, Recreation Services Manager, who accepted on behalf of the Community Services Department.

Page 585 of 1440 ends

3 • Recognition - Excellence in Innovative Technology for Visually Impaired and Community Service – Danaya Figueroa
CM Echevarria presented a recognition certificate to Danaya Figueroa on behalf of the Mayor and City Council. Echevarria also presented Figueroa with a recognition certificate from Supervisor Baca Jr. (by his office) and acknowlaged the Spartians Adult Football League who awarded Figueroa with a scholarship award.

MAYOR AND COUNCIL ITEMS - None

GIFT DISCLOSURES
Mayor Navarro asked the members present if there were any agenda items that were a conflict of interest pursuant to CMC Section 2.04.030. None disclosed.

AB 1234 ORAL REPORTS
Mayor Navarro asked the members present if there were any brief reports on meetings attended at the expense of the city. (GC Section 53232.3(d). None disclosed.

APPOINTMENTS - None
MAYOR AND COUNCIL DISCUSSION ITEMS - None

PUBLIC HEARINGS
(1) Public Hearing - LLMD I - TIME AND PLACE FIXED TO CONSIDER A

PUBLIC HEARING TO APPROVE AND ADOPT A RESOLUTION OF THE

CITY COUNCIL OF COLTON, CALIFORNIA APPROVING THE ANNUAL ENGINEER’S REPORT FOR THE COLTON LANDSCAPE AND LIGHTING MAINTENANCE DISTRICT NO. I FOR FISCAL YEAR 2025/2026, & APPROVE

AND ADOPT A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF

COLTON, CALIFORNIA, ORDERING THE LEVY AND COLLECTION OF

ASSESSMENTS FOR THE COLTON LANDSCAPE AND LIGHTING
MAINTENANCE ASSESSMENT DISTRICT NO. I FOR FISCAL YEAR
2025/2026, RESOLUTION NO. R-43-25 & R-44-25 [Staff Person: Chad Blais] Mayor Navarro announced the Public Hearing Open.

City Clerk Suchil submitted the Affidavit of Publication and reported that no protests or objections were received for this item.

Staff Presentation
Public Works and Utilities Director Chad Blais introduced Associate Engineer, Moises Peralta, and Engineering Technician II, George Mekhil, who presented the item to Council using a PowerPoint presentatation, and recommended council approve item as presented.

Page 586 of 1440 ends

4 Public Comment – None
A Motion to close the Public Hearing was made by CM González and seconded by MPT Toro.

Vote: Unanimous, Motion Passed with CM Chastain being absent.

Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provide by staff: Moises Peralta, Associate Engineer.

A Motion to approve and adopt Resolution Numbers R-43-25 and R-44-25 to approve the annual Engineer’s Report for the Colton Landscape and Lighting Maintenance Assessement District No.I for Fiscal Year 2025/2026, and to order the levy and collection of Assesments for the Colton Landscape and Lighting Maintenance Assessment Distric No. I, was made by CM Echevarria, and seconded by CM González.

Vote: Unanimous, Motion Passed with CM Chastain being absent. (2) Public Hearing - LLMD II - TIME AND PLACE FIXED TO CONSIDER A

PUBLIC HEARING TO APPROVE AND ADOPT A RESOLUTION OF THE

CITY COUNCIL OF COLTON, CALIFORNIA APPROVING THE ANNUAL ENGINEER’S REPORT FOR THE COLTON LANDSCAPE AND LIGHTING MAINTENANCE ASSESSMENT DISTRICT NO. II FOR FISCAL YEAR
2025/2026 & APPROVE AND ADOPT A RESOLUTION OF THE CITY

COUNCIL OF COLTON, CALIFORNIA, ORDERING THE LEVY AND

COLLECTION OF ASSESSMENTS FOR THE COLTON LANDSCAPE AND
LIGHTING MAINTENANCE ASSESSMENT DISTRICT NO. II FOR FISCAL YEAR 2025/2026, RESOLUTION NO. R-45-25 & R-46-25. [Staff Person: Chad Blais]
Mayor Navarro announced the Public Hearing Open.

City Clerk Suchil submitted the Affidavit of Publication and reported that no protests or objections were received for this item.

Staff Presentation
Associate Engineer, Moises Peralta, and Engineering Technician II, George Mekhil, presented to Council using a PowerPoint presentation.

Public Comment. – None
A Motion to close the Public Hearing was made by Council Member González seconded by MPT Toro.

Vote: Unanimous, Motion Passed with CM Chastain being absent.

Page 587 of 1440 ends

5 Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provide by staff: Moises Peralta, Associate Engineer.

A Motion to approve and adopt Resolution Numbers R-45-25 and R-46-25 to approve the annual Engineer’s Report for the Colton Landscape and Lighting Maintenance Assessement District No. II for Fiscal Year 2025/2026, and to order the levy and collection of Assesments for the Colton Landscape and Lighting Maintenance Assessment Distric No. II was made by Council Member González, and seconded by MPT Toro.

Vote: Unanimous, Motion Passed with CM Chastain being absent. (3) Public Hearing - Stormwater Fee - TIME AND PLACE TO CONSIDER A

PUBLIC HEARING TO APPROVE AND ADOPT A RESOLUTION OF THE

CITY COUNCIL OF THE CITY OF COLTON, CALIFORNIA APPROVING

THE BASIC FEE FOR STORM WATER SERVICES AND THE STORM WATER MANAGEMENT USER FEE FOR FISCAL YEAR 2025/2026 AS PROVIDED FOR IN CHAPTER 14.01 OF THE COLTON MUNICIPAL CODE,
RESOLUTION NO.

R-47-25. [Staff Person: Chad Blais]
Mayor Navarro announced the Public Hearing Open.

City Clerk Suchil submitted the Affidavit of Publication and reported that no protests or objections were received for this item.

Staff Presentation
Associate Engineer, Moises Peralta, and Engineering Technician II, George Mekhil, presented to Council using a PowerPoint presentation.

Public Comment.- None
A Motion to close the Public Hearing was made by CM González seconded by MPT Toro.

Vote: Unanimous, Motion Passed with CM Chastain being absent.

Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provide by staff: Moises Peralta, Associate Engineer.

A Motion to approve and adopt Resolution Number R-47-25 to approve the basic fee for storm water services and the storm water management user fee for fiscal Year 2025/2026 as provided for in Chapter 14.01 of the Colton Municipal Code was made by CM Echevarria, and seconded by MPT Toro.

Vote: Unanimous, Motion Passed with CM Chastain being absent.

Page 588 of 1440 ends

6 BUSINESS ITEMS
(4) AB 481 Report - Approve Annual Update to City Council on Military Equipment Pursuant to California AB481.

Staff Presentation
Police Chief, Anthony Vega, presented the Item to Council using a PowerPoint presentation.

Public Comment- None
Council Discussion
Discernment and discussion between Mayor and Councilmembers present, with clarification provide by staff: Anthony Vega, Chief of Police.

A Motion to approve the annual update to the City Council on Military Equipment pursuant to California AB481 was made by CM Echevarria, and seconded by CM González.

Vote: Unanimous, Motion Passed with CM Chastain being absent.

A motion was made by CM Echavarria and seconeded by CM Gonzalez to apporove the annual update on military equipment pursuant to California AB481.

Vote: Unanimous, Motion Passed with CM Chastain being absent.

PUBLIC COMMENT - The following community members addressed the Council:
• Brad Lindermoan, Colton resident
• John Stylianioes, Colton resident
• Pierce Eatmon, Colton resident

Page 589 of 1440 ends

7 CONSENT CALENDAR
City Manager, William R. Smith, informed the Council that staff would be pulling Item #13 from the agenda;
Mayor Navarro presented the Consent Calendar Items 5 through 27, minus Item #13.

Councilmembers present selected items for clarification by staff: MPT Toro, Items 12 and

23. City Manager, William R. Smith, and Electric Utilities Director, Charles Berry, provided the clarification needed.

Motion and Second by CM González/CM Echevarria to approve Consent Calendar Items 5 through 27 (minus Item #13), with González voting no on Item #27.

Vote: Unanimous, Motion Passes with CM González voting no on Item #27, and with CM Chastain being absent.
(5) Minutes - Approval of Minutes for the City Council Regular Meetings Held on May, 20, 2025 and June 3, 2025, on File in the Office of the City Clerk. [City Clerk: Isaac Suchil]
(6) Warrants - Approve voucher numbers 219381 to 219462 dated 05/15/2025 and totaling $528,931.39; voucher numbers 219463 to 219608 dated 05/22/2025 and totaling $1,057,007.24 and a payroll disbursement listing dated 02/01/2025 to 02/14/2025 and totaling $1,188,659.85.
[Staff Person: Stacey Dabbs]
(7) Change Order - Roy Allan Slurry Seal, Inc. - Approve Change Order No. 1 with Roy Allan Slurry Seal Inc., for FY 24-25 Slurry Seal Project. [Staff Person: Chad Blais]
(8) Conclude Emergency Condition at Agua Mansa Power Plant - Conclude Emergency Condition at Agua Mansa Power Plant.
[Staff Person: Charles Berry]
(9) Contract Amendment - ECORP Consulting - Approve Second Contract Amendment for Environmental Services with ECORP Consulting Inc., and Corresponding Reimbursement Agreement with Applicant.
[Staff Person: Heidi Duron]
(10) Contract Amendment - ICF Resources - Approve Third Amendment to Professional Services Agreement with ICF Resources, LLC for Electric Engineering Consulting Services.
[Staff Person: Charles Berry]
(11) Contract Award - ESRI - Approve Award of Contract to Environmental System Research Industries Inc. (ESRI) for Electric GIS Support. [Staff Person: Chad Blais]
(12) Contract Award - Great Western Installations, Inc - Award Contract to Great Western Installations, Inc for Dauer Park Playground Renovation. [Staff Person: Deb Farrar]

Page 590 of 1440 ends

8 (13) Contract Award - LC Paving & Sealing, Inc. - Approve the Award of Contract to LC Paving & Sealing, Inc. for the West Colton Bike Lane Project for the Amount of $1,978,522.00, RESOLUTION NO. R-53-25.
[Staff Person: Chad Blais]
(14) Contract Award - Synagro - Approve Award of Contract to Synagro for Hauling & Disposal of Class B Bio-solids.
[Staff Person: Chad Blais]
(15) Contract Award - Various Transformers - Approve Contract Award to AMEK A&S, INC., in the Amount of $711,068, AR Transformers INC., in the Amount of $76,417, Magnetron USA LLC in the Amount of $42,085, and Pulse MAC Solutions, LLC in the Amount of $79,326 for Various Transformers.
[Staff Person: Charles Berry]
(16) DBE Participation Level for FY 25/26 - Approve Resolution Authorizing the Annual Anticipated DBE Participation Level (AADPL) for Federal Fiscal Year 2025/2026, RESOLUTION NO. R-52-25
[Staff Person: Chad Blais]
(17) Grant Allocation Revision - JAG Funding - Approve Grant Allocation Revision of Justice Assistance Grant (JAG) Funding to Reflect the Purchase of Photography Equipment.
[Staff Person: Anthony Vega]
(18) MOU - IBEW-Electric 2025-2027 - Approve and Adopt MOU with IBEW-Electric for 2025-2027, RESOLUTION NO. R-49-25.
[Staff Person: Tom Cody]
(19) Notice of Completion - Fencing at Habitat Park - Approve the Execution and Recordation of the Notice of Completion for the Fencing Project at the Colton Eco Friendly Park with Community Sports Fields and Amenities. [Staff Person: Deb Farrar]
(20) Notice of Completion - FY2023-24 Asphalt Paving Project - Approve the Execution and Recordation of the Notice of Completion for the FY 23-24 Asphalt Paving Project.
[Staff Person: Chad Blais]
(21) Notice of Completion - Gonzales & Hutton Centers Painting Project - Approve the Execution and Recordation of the Notice of Completion for the Gonzales and Hutton Community Centers Painting Project.
[Staff Person: Chad Blais]
(22) Notice of Completion - Library Restroom Project - Approve the Execution and Recordation of the Notice of Completion for the Library Restroom Project. [Staff Person: Chad Blais]
(23) Purchase - Altec Industries, Inc. - Approve the Purchase of One AN67-e100 Aerial Platform Truck from Altec Industries, Inc.
[Staff Person: Charles Berry]

Page 591 of 1440 ends

9 (24) Purchase - Altec Industries, Inc. - Approve the Purchase of One TS336-VG VGroove Trailer-Mounted Tensioner from Altec Industries, Inc. [Staff Person: Charles Berry]
(25) Purchase - Altec Industries, Inc. - Approve the Purchase of One TS20-4P TrailerMounted Drum Puller from Altec Industries, Inc. [Staff Person: Charles Berry]
(26) Resolution - Fire Marshal Mandated Inspections - Approve a Resolution Accepting the 2025 California State Fire Marshal Mandated Inspections, RESOLUTION NO.

R-51-25.
[Staff Person: Ray Bruno]
(27) Resolution - Local Responsibility Area Wildland Protection Reimbursement Agreement - Approve Resolution Renewing the Local Responsibility Area Wildland Protection Reimbursement Agreement, RESOLUTION NO. R-48-25. [Staff Person: Ray Bruno]

MAYOR AND COUNCIL ORAL REPORTS AND COMMENTS
Comments from Mayor, Council and City Treasurer on various issues and activities throughout the community.

Council comments can be seen at www.coltonca.gov web site CITY MANAGER'S REPORTS - None

ADJOURNMENT
At 7:12 p.m.Mayor Navarro adjourned the Regular Council Meeting in Memorium of Colton resident Eleanor Tejada; a moment of silence was observed in her honor. ___________________________
Isaac T. Suchil,
Colton City Clerk

Page 592 of 1440 ends

Item: 2.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Stacey Dabbs, Finance Director
Item Name: Warrants - Approve US Bank voucher dated 05/29/2025 and totaling $66,459.62; voucher numbers 219609 to 219688 dated 05/28/2025 and totaling $100,680.52; voucher numbers 219689 to 219804 dated 05/29/2025 and totaling $1,202,944.23; voucher numbers 219805 to 219910 dated 06/05/2025 and totaling $3,095,006.02; voucher numbers 219911 to 220000 dated 06/12/2025 and totaling $1,010,144.26 and voucher numbers 220001 to 220099 dated 06/19/2025 and totaling $434,354.66.

Recommended Action:

Staff recommends the City Council approve US Bank voucher dated 05/29/2025 and totaling $66,459.62; voucher numbers 219609 to 219688 dated 05/28/2025 and totaling $100,680.52; voucher numbers 219689 to 219804 dated 05/29/2025 and totaling $1,202,944.23; voucher numbers 219805 to 219910 dated 06/05/2025 and totaling $3,095,006.02; voucher numbers 219911 to 220000 dated 06/12/2025 and totaling $1,010,144.26 and voucher numbers 220001 to 220099 dated 06/19/2025 and totaling $434,354.66.

Background:

The California Government Code requires that the legislative body ratify all vouchers issued in the course of conducting City business.

Issues/Analysis:

All vouchers and related backup documentation have been reviewed by the Finance Director and City Manager.

Fiscal Impacts:

None.

Alternatives:

1. Provide alternative direction to staff.

Page 593 of 1440 ends

Attachments:

1. Voucher lists 07.15.25

Page 594 of 1440 ends
Page 595 of 1440 ends
Page 596 of 1440 ends
Page 597 of 1440 ends
Page 598 of 1440 ends
Page 599 of 1440 ends
Page 600 of 1440 ends
Page 601 of 1440 ends
Page 602 of 1440 ends
Page 603 of 1440 ends
Page 604 of 1440 ends
Page 605 of 1440 ends
Page 606 of 1440 ends
Page 607 of 1440 ends
Page 608 of 1440 ends
Page 609 of 1440 ends
Page 610 of 1440 ends
Page 611 of 1440 ends
Page 612 of 1440 ends
Page 613 of 1440 ends
Page 614 of 1440 ends
Page 615 of 1440 ends
Page 616 of 1440 ends
Page 617 of 1440 ends
Page 618 of 1440 ends
Page 619 of 1440 ends
Page 620 of 1440 ends
Page 621 of 1440 ends
Page 622 of 1440 ends
Page 623 of 1440 ends
Page 624 of 1440 ends
Page 625 of 1440 ends
Page 626 of 1440 ends
Page 627 of 1440 ends
Page 628 of 1440 ends
Page 629 of 1440 ends
Page 630 of 1440 ends
Page 631 of 1440 ends
Page 632 of 1440 ends
Page 633 of 1440 ends
Page 634 of 1440 ends
Page 635 of 1440 ends
Page 636 of 1440 ends
Page 637 of 1440 ends
Page 638 of 1440 ends
Page 639 of 1440 ends
Page 640 of 1440 ends
Page 641 of 1440 ends
Page 642 of 1440 ends
Page 643 of 1440 ends
Page 644 of 1440 ends
Page 645 of 1440 ends
Page 646 of 1440 ends
Page 647 of 1440 ends
Page 648 of 1440 ends
Page 649 of 1440 ends
Page 650 of 1440 ends
Page 651 of 1440 ends
Page 652 of 1440 ends
Page 653 of 1440 ends
Page 654 of 1440 ends
Page 655 of 1440 ends
Page 656 of 1440 ends
Page 657 of 1440 ends
Page 658 of 1440 ends
Page 659 of 1440 ends
Page 660 of 1440 ends
Page 661 of 1440 ends
Page 662 of 1440 ends
Page 663 of 1440 ends
Page 664 of 1440 ends
Page 665 of 1440 ends
Page 666 of 1440 ends
Page 667 of 1440 ends
Page 668 of 1440 ends
Page 669 of 1440 ends
Page 670 of 1440 ends
Page 671 of 1440 ends
Page 672 of 1440 ends
Page 673 of 1440 ends
Page 674 of 1440 ends
Page 675 of 1440 ends
Page 676 of 1440 ends
Page 677 of 1440 ends
Page 678 of 1440 ends
Page 679 of 1440 ends
Page 680 of 1440 ends
Page 681 of 1440 ends
Page 682 of 1440 ends
Page 683 of 1440 ends
Page 684 of 1440 ends
Page 685 of 1440 ends
Page 686 of 1440 ends
Page 687 of 1440 ends
Page 688 of 1440 ends
Page 689 of 1440 ends
Page 690 of 1440 ends
Page 691 of 1440 ends
Page 692 of 1440 ends
Page 693 of 1440 ends
Page 694 of 1440 ends
Page 695 of 1440 ends
Page 696 of 1440 ends
Page 697 of 1440 ends
Page 698 of 1440 ends
Page 699 of 1440 ends
Page 700 of 1440 ends
Page 701 of 1440 ends
Page 702 of 1440 ends
Page 703 of 1440 ends
Page 704 of 1440 ends
Page 705 of 1440 ends
Page 706 of 1440 ends
Page 707 of 1440 ends
Page 708 of 1440 ends
Page 709 of 1440 ends
Page 710 of 1440 ends
Page 711 of 1440 ends
Page 712 of 1440 ends
Page 713 of 1440 ends
Page 714 of 1440 ends
Page 715 of 1440 ends
Page 716 of 1440 ends
Page 717 of 1440 ends

Item: 3.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Charles Berry, Electric Utility Director
Item Name: Agreement - Blais & Associates - Approve Agreement with Blais & Associates for Grant Writing Services.

Recommended Action:

Staff recommends that the City Council:

1. Waive the formal bidding process in accordance with Colton Municipal Code 3.08.140 (E) and approve a $29,000 professional services agreement for Blais and Associates to provide grant-writing services to apply for the Community Energy Reliability & Resilience Investment (CERRI) grant program; and,

2. Authorize the City Manager or his designee to execute all documents related to the applications.

Background:

The City of Colton currently has a contract with Blais and Associates for grant writing services out of the City Manager's Office. The current proposal for grant-writing services to apply for the CERRI grant program is for $29,000, which when totaled with other City grant applications, could exceed the City Manager's $50,000 limit when combined with the existing contract.

Blais and Associates are uniquely qualified due to their extensive experience and proven success in securing grants for the City of Colton. They have a well-documented history of:
• Successfully obtaining grants from State and Federal departments for the City of Colton. • Demonstrating a deep understanding of the specific requirements and expectations of these funding bodies.
• Providing tailored services that align precisely with our City’s objectives.

Page 718 of 1440 ends

Proven Performance and Results
Blais & Associates' previous work with the City of Colton has consistently resulted in:
• High-quality, compelling grant proposals that align with funding agency guidelines. • A high success rate in securing funding, including Department of Energy Block Grants and Department of Toxic Substances Control grants in previous Fiscal Years (FY).

Specialized Knowledge
The vendor possesses specialized knowledge and skills that are crucial for our specific needs, including:
• In-depth familiarity with the grant project, as they had recently applied for a State grant application for the Strategic Growth Council Program grant, which the City scored high. • Expertise in federal grant applications.

Time Sensitivity
The current timeline for grant applications necessitates immediate and dedicated support. Blais & Associates has demonstrated their ability to start work promptly and deliver high-quality proposals within tight deadlines. Their established processes and familiarity with the City’s needs ensure that the City can meet critical submission deadlines.

Due to Blais & Associates’ demonstrated success and established familiarity with the City of Colton, staff recommends waiving the competitive bidding process pursuant to Colton Municipal Code Section 3.08.140(E), which allows the City Manager to waive formal bidding for NonPublic Projects when it is determined to be in the best interest of the City and its administrative operations
Issues/Analysis:

The Community Energy Reliability & Resilience Investment (CERRI) Program is a competitive grant initiative that supports grid hardening and resilience projects throughout California. The program aims to enhance energy reliability, reduce the frequency and impact of power outages, and ensure that communities, particularly those most vulnerable, have consistent access to clean, affordable, and dependable energy.

CERRI directly supports California’s climate and energy goals while advancing energy equity and driving local economic development. Project funding is prioritized for initiatives that deliver tangible community benefits and align with statewide policy objectives.

Program Objectives:
• Enhance Energy Reliability and Resilience
Reduce the frequency, duration, and severity of power outages and strengthen community capacity to maintain essential services during emergencies. • Deliver Equitable Community Benefits

Page 719 of 1440 ends

Direct resources toward priority communities, including low-income, disadvantaged, and tribal populations, and those with critical energy resilience needs. • Advance State Energy and Climate Goals
Accelerate California’s transition to a clean energy future through strategic infrastructure investments.
• Promote Workforce Development
Create high-quality, family-sustaining jobs with strong labor protections, and invest in workforce training for long-term careers in the clean energy sector.

Proposed Use of CERRI Funds
If awarded, CERRI funding would support critical infrastructure improvements, including:
• Utility Pole Management and Power Line Relocation
Rebuilding and rerouting an existing 66-kilovolt (kV) transmission line to accommodate future development. The new 0.75-mile line will include approximately 20 poles spaced around 200 feet apart, with guy wires as needed.
• Deployment of Distributed Energy Resources (DERs)
Construction of resilience-enhancing DERs, including a 5 MW Battery Energy Storage System (BESS) integrated with a 1 MW solar array at the Agua Mansa Power Plant.

These components will form part of a microgrid to bolster system adaptability and maintain power during outages.

Following internal review, staff have concluded that this proposed project strongly aligns with the California Energy Commission’s (CEC) priority investment areas, including:
• Utility Pole Management
• Power Line Relocation
• Deployment and Construction of Distributed Energy Resources Fiscal Impacts:

Sufficient appropriations for grant-writing services for the Environmental and Climate Justice Community Change Grants Program are budgeted and available in the FY2026 adopted budget in account Electric Utility Fund, Environmental Sustainability and Conservation Division, Professional Services Account Number 520-8000-8005-2350-0923-000.

Alternatives:

Provide Alternative Direction to Staff.

Attachments:

1. Q_Colton_CERRI_082925

Page 720 of 1440 ends

Quote Prepared By:

Natale Lessey
949-589-6338
[email protected]
www.blaisassoc.com
Colton: CERRI Round 2 5/16/25 1 of 2
Client Name
Client Contact(s)
Grant Program
Project Due
Project Name
Date Prepared
Project Cost
$29,000
$0
$0
$0
$0
$29,000
Activity
Project Quote
May 16, 2025
$29,000
City of Colton
Jessica Sutorus, Environmental Conservation Supervisor
Community Energy Reliability and Resilience Investment (CERRI) Program - Round 2
August 29, 2025
TBD
Preparatory work including reviewing guidelines and application materials; developing timeline & checklist; hosting a kick-off conference call with client; attending to follow-up action items from kick-off call; preparing internal e-file system.

Complete Budget Form (Attachment 05).

Complete Project Schedule (Attachment 04).

Complete Project Narrative Form (Attachment 02).

Complete Application Form (Attachment 01).

Conference calls and client coordination. Provide 80% draft and 100% final to client for review. Incorporate up to two sets of written client feedback and comments. Prepare final files for Client's permanent record keeping. Submit application via ECAMS system.

Develop two (2) letters of support (Attachment 08).

Complete Submittal Checklist (Attachment A).

Complete Applicate Declaration Form (Attachment 10).

Complete forms. Includes 1) CEQA Compliance (Attachement 06), 2) NEPA Environmental Questionnaire (Attachment 07).

Complete Scope of Work (Attachment 03).

Complete Match Funding Commitment Letter (Attachment 08).

Complete Project Metrics Form (Attachement 09).

Complete Foreign National Participation Document (Attachment 11).

GRAND TOTAL
Direct Costs

SUBTOTAL

SUBTOTAL
Final Files (link)
Reproduction for hard copy (not applicable)
Express Delivery mail or courier services (not applicable)

Page 721 of 1440 ends

Quote Prepared By:

Natale Lessey
949-589-6338
[email protected]
www.blaisassoc.com
Colton: CERRI Round 2 5/16/25 2 of 2
Signature Approving Costs and Authorizing Notice to Proceed Date Printed Name
Please note that this quote is fixed fee for service based on current conditions and understandings. Many factors may change during the development of a project, including Client requests, that may increase the amount of work required to successfully perform services. During the course of work, if there is a material change in scope, B&A will notify the point of contact and mutually agree to a change order or discuss alternatives.

By signing this quote, the Client agrees to:
- Provide requested information prior to stipulated deadline, dates to be jointly agreed upon and incorporated into the Timeline and Checklist. - Attend all scheduled calls and be available for ad-hoc calls, as needed. - Respond to inquiries from the B&A team within one business day. - Assign a person to be B&A's main point of contact throughout the duration of the project.

Notes and Assumptions
1) To best serve you, B&A has reserved staff time for this project until the response date requested in the transmittal e-mail. 2) Total Funding: $170M. The Round 2 Grant Funding Opportunity (solicitation) will include $37.28 million in Year 3 funding plus roll over $14.59 million in unspent funds from the Round 1 Grant Funding Opportunity.

Page 722 of 1440 ends

Item: 4.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Anthony Vega, Chief of Police
Item Name: Agreement - AXON Enterprise, Inc. - Approve an Agreement with AXON Enterprise, Inc. for Seventy-Five (75) Body Worn Cameras, Seventy-Five (75) Tasers, Fusus Pro Licenses, and Associated Equipment and Software.

Recommended Action:

Staff recommends the City Council dispense with competitive bidding in accordance with Colton Municipal Code Section 3.08.140(e) and approve a five-year agreement with Axon Enterprise, Inc., for $1,587,796.89 for the purchase and implementation of the Officer Safety Plan 10 Plus, Axon Fusus Pro Licenses, body-worn cameras, Taser 10 units, virtual reality training systems, data management software, and related services and warranties.

Background:

The Colton Police Department currently utilizes Axon technologies for officer safety, evidence management, and transparency. The existing Axon agreement is scheduled to terminate on September 15, 2025, and the department seeks to maintain continuity by transitioning to Axon’s latest bundled platform — the Officer Safety Plan 10 Plus — which includes upgrades to hardware, enhanced training tools, and a full suite of data integration services.

This updated plan also incorporates Axon Fusus Pro, a real-time crime center platform that enhances situational awareness by integrating video feeds, GPS, body camera footage, and mapping systems.

Issues/Analysis:

The proposed agreement includes the following major components:
• 75 Body-Worn Cameras (Axon Body 4) with mounting equipment, multi-bay docks, and tap refresh replacements during the contract term
• 75 TASER 10 Units, holsters, magazines (live, training, inert), and replacement cartridges • Axon Fusus Pro and Basic Licenses supporting 75 officers, along with 150 CCTV stream

Page 723 of 1440 ends

licenses
• Unlimited Axon Evidence Storage and Redaction Assistant Licenses • Virtual Reality Training System, including VR headsets, tablets, controllers, and training content
• Axon Signal and associated installation services
• Warranties on key hardware components throughout the five-year term Axon has provided a bundled discount of over $674,000 off the list price, with an annual cost of approximately $315,914.75, beginning August 2025. The pricing also includes a net transfer debit adjustment to accommodate the termination of the previous Axon contract.

Because this agreement ensures continuity of mission-critical public safety equipment and software already in use and integrates with current operations, staff respectfully requests an exemption from the competitive bidding process pursuant to Colton Municipal Code (CMC) Section 3.08.140 – Exceptions to Competitive Bidding – Non-Public Projects, specifically Subsection (e):
"Purpose of Bidding is Otherwise Accomplished. When the City Manager determines that it is in the best interest of the City and its administrative operations to dispense with public bidding for Non-Public Projects under this chapter. Prior City Council concurrence with the City Manager's determination shall be required for Non-Public Project purchases over one hundred thousand dollars.

Fiscal Impacts:

Sufficient appropriations are available for the first contract year in the FY 2025-26 budget in General Fund Police Administration Safety Equipment Account # 100-6070-6071-1180-0000- 000. A five-year contract commitment requires additional ongoing appropriations for years two through five of the agreement in the following amounts:
• Year 1: $324,137.92
• Years 2–5: $315,914.74 each year
Alternatives:

1. Provide alternative direction to staff.

Attachments:

1. Colton CA OSP10+ Rewrite Quote (75) with Fusus Pro- + Addtl Basic Pro -Final 6-12-25

Page 724 of 1440 ends
Page 1 ends

Q-669569-45820DG
Issued: 06/12/2025
Quote Expiration: 06/30/2025
Estimated Contract Start Date: 09/15/2025
Account Number: 109468
Payment Terms: N30
Mode of Delivery: UPS-GND
Credit/Debit Amount: $0.00

SHIP TO BILL TO SALES REPRESENTATIVE PRIMARY CONTACT
Colton Police Dept. - CA
650 N La Cadena Dr
Colton,
CA
92324-2823
USA
Colton Police Dept. - CA
650 N La Cadena Dr
Colton
CA
92324-2823
USA
Email:
95-6000694
David Gollobit
Phone: +1 6023212774
Email: [email protected]
Fax:

Gregory Castillo
Phone:

Email: [email protected]
Fax:

Quote Summary Discount Summary
Program Length 60 Months Average Savings Per Year $134,876.09 TOTAL COST $1,539,905.76
ESTIMATED TOTAL W/ TAX $1,587,796.89 TOTAL SAVINGS $674,380.47 Axon Enterprise, Inc.
17800 N 85th St.

Scottsdale, Arizona 85255
United States
VAT: 86-0741227
Domestic: (800) 978-2737
International: +1.800.978.2737

Page 725 of 1440 ends
Page 2 ends

Payment Summary
Date Subtotal Tax Total
Aug 2025 $313,649.76 $10,488.16 $324,137.92
Aug 2026 $306,564.00 $9,350.74 $315,914.74
Aug 2027 $306,564.00 $9,350.74 $315,914.74
Aug 2028 $306,564.00 $9,350.74 $315,914.74
Aug 2029 $306,564.00 $9,350.75 $315,914.75
Total $1,539,905.76 $47,891.13 $1,587,796.89

Page 726 of 1440 ends
Page 3 ends

Quote Unbundled Price: $2,298,111.20
Quote List Price: $1,700,466.20
Quote Subtotal: $1,539,905.76
Pricing
All deliverables are detailed in Delivery Schedules section lower in proposal Item Description Qty Term Unbundled List Price Net Price Subtotal Tax Total Program
100553 TRANSFER CREDIT - SOFTWARE AND SERVICES 1 $1.00 ($5,913.29) ($5,913.29) $0.00 ($5,913.29) 100552 TRANSFER CREDIT - GOODS 1 $1.00 $12,999.05 $12,999.05 $1,137.42 $14,136.47 M00033 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 75 60 $468.62 $335.81 $335.81 $1,511,145.00 $46,753.71 $1,557,898.71 A la Carte Hardware
H00002 AB4 Multi Bay Dock Bundle 10 $3,277.80 $0.00 $0.00 $0.00 $0.00 H00001 AB4 Camera Bundle 75 $1,798.00 $0.00 $0.00 $0.00 $0.00 A la Carte Software
ProLicense Pro License Bundle 1 60 $48.82 $48.75 $2,925.00 $0.00 $2,925.00 BasicLicense Basic License Bundle 10 60 $16.27 $16.25 $9,750.00 $0.00 $9,750.00 A la Carte Services
100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 $1,500.00 $1,500.00 $1,500.00 $0.00 $1,500.00 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 $7,500.00 $7,500.00 $7,500.00 $0.00 $7,500.00 Total $1,539,905.76 $47,891.13 $1,587,796.89
Delivery Schedule
Hardware
Bundle Item Description QTY Shipping Location Estimated Delivery Date AB4 Camera Bundle 100147 AXON BODY 4 - CAMERA - NA US FIRST RESPONDER BLK RAPIDLOCK 10 1 08/15/2025
AB4 Camera Bundle 100147 AXON BODY 4 - CAMERA - NA US FIRST RESPONDER BLK RAPIDLOCK 65 1 08/15/2025
AB4 Camera Bundle 100147 AXON BODY 4 - CAMERA - NA US FIRST RESPONDER BLK RAPIDLOCK 2 1 08/15/2025
AB4 Camera Bundle 100466 AXON BODY 4 - CABLE - USB-C TO USB-C 83 1 08/15/2025 AB4 Camera Bundle 100775 AXON BODY 4 - MAGNETIC DISCONNECT CABLE 83 1 08/15/2025 AB4 Camera Bundle 74028 AXON BODY - MOUNT - WING CLIP RAPIDLOCK 83 1 08/15/2025 AB4 Multi Bay Dock Bundle 100206 AXON BODY 4 - 8 BAY DOCK 9 1 08/15/2025 AB4 Multi Bay Dock Bundle 100206 AXON BODY 4 - 8 BAY DOCK 1 1 08/15/2025 AB4 Multi Bay Dock Bundle 70033 AXON - DOCK WALL MOUNT - BRACKET ASSY 9 1 08/15/2025 AB4 Multi Bay Dock Bundle 70033 AXON - DOCK WALL MOUNT - BRACKET ASSY 1 1 08/15/2025 AB4 Multi Bay Dock Bundle 71019 AXON BODY - DOCK POWERCORD - NORTH AMERICA 9 1 08/15/2025 AB4 Multi Bay Dock Bundle 71019 AXON BODY - DOCK POWERCORD - NORTH AMERICA 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100126 AXON VR - TACTICAL BAG 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100390 AXON TASER 10 - HANDLE - YELLOW CLASS 3R 2 2 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100390 AXON TASER 10 - HANDLE - YELLOW CLASS 3R 75 2 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100393 AXON TASER 10 - MAGAZINE - LIVE DUTY BLACK 75 1 08/15/2025

Page 727 of 1440 ends
Page 4 ends

Hardware
Bundle Item Description QTY Shipping Location Estimated Delivery Date BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100393 AXON TASER 10 - MAGAZINE - LIVE DUTY BLACK 2 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100394 AXON TASER 10 - MAGAZINE - HALT TRAINING BLUE 4 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100395 AXON TASER 10 - MAGAZINE - LIVE TRAINING PURPLE 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100396 AXON TASER 10 - MAGAZINE - INERT RED 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100399 AXON TASER 10 - CARTRIDGE - LIVE 1500 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100400 AXON TASER 10 - CARTRIDGE - HALT 750 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100401 AXON TASER 10 - CARTRIDGE - INERT 30 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100591 AXON TASER - CLEANING KIT 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100611 AXON TASER 10 - SAFARILAND HOLSTER - RH 75 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100623 ENHANCED HOOK-AND-LOOP TRAINING (HALT) SUIT (V2) 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100681 AXON SIGNAL - SIDEARM SENSOR ONLY 75 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100748 AXON VR - CONTROLLER - TASER 10 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100832 AXON VR - CONTROLLER - HANDGUN VR19H 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101122 AXON VR - HOLSTER - T10 SAFARILAND GRAY - RH 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101294 AXON VR - TABLET 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101300 AXON VR - TABLET CASE 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101455 AXON TASER 10 - REPLACEMENT TOOL KIT - INTERPOSER BUCKET 1 1 08/15/2025
BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101456 AXON TASER 10 - REPLACEMENT INTERPOSER BUCKET 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20018 AXON TASER - BATTERY PACK - TACTICAL 15 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20018 AXON TASER - BATTERY PACK - TACTICAL 75 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20018 AXON TASER - BATTERY PACK - TACTICAL 2 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20378 AXON VR - HEADSET - HTC FOCUS 3 3 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 70033 AXON - DOCK WALL MOUNT - BRACKET ASSY 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 71019 AXON BODY - DOCK POWERCORD - NORTH AMERICA 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 71044 AXON SIGNAL - BATTERY - CR2430 SINGLE PACK 150 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 74200 AXON TASER - DOCK - SIX BAY PLUS CORE 1 1 08/15/2025 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80087 AXON TASER - TARGET - CONDUCTIVE PROFESSIONAL RUGGEDIZED 1 1 08/15/2025
BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80090 AXON TASER - TARGET FRAME - PROFESSIONAL 27.5 IN X 75 IN 1 1 08/15/2025
BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100399 AXON TASER 10 - CARTRIDGE - LIVE 230 1 08/15/2026 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100400 AXON TASER 10 - CARTRIDGE - HALT 600 1 08/15/2026 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100399 AXON TASER 10 - CARTRIDGE - LIVE 220 1 08/15/2027 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100400 AXON TASER 10 - CARTRIDGE - HALT 600 1 08/15/2027 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100210 AXON VR - TAP REFRESH 1 - TABLET 3 1 02/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101009 AXON VR - TAP REFRESH 1 - SIDEARM CONTROLLER 3 1 02/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101012 AXON VR - TAP REFRESH 1 - CONTROLLER 3 1 02/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20373 AXON VR - TAP REFRESH 1 - HEADSET 3 1 02/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73309 AXON BODY - TAP REFRESH 1 - CAMERA 77 1 02/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73689 AXON BODY - TAP REFRESH 1 - DOCK MULTI BAY 10 1 02/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100399 AXON TASER 10 - CARTRIDGE - LIVE 230 1 08/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100400 AXON TASER 10 - CARTRIDGE - HALT 600 1 08/15/2028 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100399 AXON TASER 10 - CARTRIDGE - LIVE 220 1 08/15/2029 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100400 AXON TASER 10 - CARTRIDGE - HALT 600 1 08/15/2029 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73310 AXON BODY - TAP REFRESH 2 - CAMERA 77 1 08/15/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73688 AXON BODY - TAP REFRESH 2 - DOCK MULTI BAY 10 1 08/15/2030 Software
Bundle Item Description QTY Estimated Start Date Estimated End Date Basic License Bundle 73683 AXON EVIDENCE - STORAGE - 10GB A LA CARTE 10 09/15/2025 09/14/2030

Page 728 of 1440 ends
Page 5 ends

Software
Bundle Item Description QTY Estimated Start Date Estimated End Date Basic License Bundle 73840 AXON EVIDENCE - ECOM LICENSE - BASIC 10 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100801 AXON RECORDS - OSP LICENSE 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101180 AXON TASER - DATA SCIENCE PROGRAM 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101705 AXON FUSUS - LICENSE - PRO USER 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101711 AXON FUSUS - LICENSE - ADDITIONAL CCTV STREAMS 150 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20248 AXON TASER - EVIDENCE.COM LICENSE 1 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20248 AXON TASER - EVIDENCE.COM LICENSE 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 20370 AXON VR - USER ACCESS - FULL VR 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73449 AXON BODY - LICENSE - DEVICE CONNECTIVITY 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73478 AXON EVIDENCE - REDACTION ASSISTANT USER LICENSE 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73618 AXON COMMUNITY REQUEST 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73638 AXON STANDARDS - LICENSE 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73682 AXON EVIDENCE - AUTO TAGGING LICENSE 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73683 AXON EVIDENCE - STORAGE - 10GB A LA CARTE 750 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73686 AXON EVIDENCE - STORAGE - UNLIMITED (AXON DEVICE) 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73739 AXON PERFORMANCE - LICENSE 75 09/15/2025 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 73746 AXON EVIDENCE - ECOM LICENSE - PRO 75 09/15/2025 09/14/2030 Pro License Bundle 73683 AXON EVIDENCE - STORAGE - 10GB A LA CARTE 3 09/15/2025 09/14/2030 Pro License Bundle 73746 AXON EVIDENCE - ECOM LICENSE - PRO 1 09/15/2025 09/14/2030 Services
Bundle Item Description QTY
BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100751 AXON TASER 10 - REPLACEMENT ACCESS PROGRAM - DUTY CARTRIDGE 75 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101184 AXON INVESTIGATE - TRAINING - OPERATOR AND EXAMINER 6 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101193 AXON TASER - ON DEMAND CERTIFICATION 1 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101780 AXON FUSUS - PSO - SW IMPLEMENTATION - PRO 1 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 11642 AXON INVESTIGATE - THIRD PARTY VIDEO SUPPORT 75 A la Carte 100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 A la Carte 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 Warranties
Bundle Item Description QTY Estimated Start Date Estimated End Date BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100197 AXON VR - EXT WARRANTY - HEADSET 3 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100213 AXON VR - EXT WARRANTY - TABLET 3 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100704 AXON TASER 10 - EXT WARRANTY - HANDLE 75 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 100704 AXON TASER 10 - EXT WARRANTY - HANDLE 2 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101007 AXON VR - EXT WARRANTY - CONTROLLER 3 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 101008 AXON VR - EXT WARRANTY - HANDGUN CONTROLLER 3 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80374 AXON TASER - EXT WARRANTY - BATTERY PACK T7/T10 15 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80374 AXON TASER - EXT WARRANTY - BATTERY PACK T7/T10 75 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80374 AXON TASER - EXT WARRANTY - BATTERY PACK T7/T10 2 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80396 AXON TASER - EXT WARRANTY - DOCK SIX BAY T7/T10 1 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80464 AXON BODY - TAP WARRANTY - CAMERA 75 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80464 AXON BODY - TAP WARRANTY - CAMERA 2 08/15/2026 09/14/2030 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 80465 AXON BODY - TAP WARRANTY - MULTI BAY DOCK 10 08/15/2026 09/14/2030

Page 729 of 1440 ends
Page 6 ends

Shipping Locations
Location Number Street City State Zip Country
1 650 N La Cadena Dr Colton CA 92324-2823 USA
2 650 N La Cadena Dr Colton CA 92324-2823 USA
Payment Details
Aug 2025
Invoice Plan Item Description Qty Subtotal Tax Total
Year 1 100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 $300.00 $0.00 $300.00 Year 1 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 $1,500.00 $0.00 $1,500.00 Year 1 BasicLicense Basic License Bundle 10 $1,950.00 $0.00 $1,950.00 Year 1 H00001 AB4 Camera Bundle 75 $0.00 $0.00 $0.00
Year 1 H00002 AB4 Multi Bay Dock Bundle 10 $0.00 $0.00 $0.00 Year 1 M00033 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 75 $302,229.00 $9,350.74 $311,579.74 Year 1 ProLicense Pro License Bundle 1 $585.00 $0.00 $585.00 Invoice Upon Fulfillment 100552 TRANSFER CREDIT - GOODS 1 $12,999.05 $1,137.42 $14,136.47 Invoice Upon Fulfillment 100553 TRANSFER CREDIT - SOFTWARE AND SERVICES 1 ($5,913.29) $0.00 ($5,913.29) Total $313,649.76 $10,488.16 $324,137.92
Aug 2026
Invoice Plan Item Description Qty Subtotal Tax Total
Year 2 100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 $300.00 $0.00 $300.00 Year 2 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 $1,500.00 $0.00 $1,500.00 Year 2 BasicLicense Basic License Bundle 10 $1,950.00 $0.00 $1,950.00 Year 2 H00001 AB4 Camera Bundle 75 $0.00 $0.00 $0.00
Year 2 H00002 AB4 Multi Bay Dock Bundle 10 $0.00 $0.00 $0.00 Year 2 M00033 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 75 $302,229.00 $9,350.74 $311,579.74 Year 2 ProLicense Pro License Bundle 1 $585.00 $0.00 $585.00 Total $306,564.00 $9,350.74 $315,914.74
Aug 2027
Invoice Plan Item Description Qty Subtotal Tax Total
Year 3 100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 $300.00 $0.00 $300.00 Year 3 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 $1,500.00 $0.00 $1,500.00 Year 3 BasicLicense Basic License Bundle 10 $1,950.00 $0.00 $1,950.00 Year 3 H00001 AB4 Camera Bundle 75 $0.00 $0.00 $0.00
Year 3 H00002 AB4 Multi Bay Dock Bundle 10 $0.00 $0.00 $0.00 Year 3 M00033 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 75 $302,229.00 $9,350.74 $311,579.74 Year 3 ProLicense Pro License Bundle 1 $585.00 $0.00 $585.00 Total $306,564.00 $9,350.74 $315,914.74
Aug 2028
Invoice Plan Item Description Qty Subtotal Tax Total
Year 4 100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 $300.00 $0.00 $300.00

Page 730 of 1440 ends
Page 7 ends

Aug 2028
Invoice Plan Item Description Qty Subtotal Tax Total
Year 4 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 $1,500.00 $0.00 $1,500.00 Year 4 BasicLicense Basic License Bundle 10 $1,950.00 $0.00 $1,950.00 Year 4 H00001 AB4 Camera Bundle 75 $0.00 $0.00 $0.00
Year 4 H00002 AB4 Multi Bay Dock Bundle 10 $0.00 $0.00 $0.00 Year 4 M00033 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 75 $302,229.00 $9,350.74 $311,579.74 Year 4 ProLicense Pro License Bundle 1 $585.00 $0.00 $585.00 Total $306,564.00 $9,350.74 $315,914.74
Aug 2029
Invoice Plan Item Description Qty Subtotal Tax Total
Year 5 100610 AXON SIGNAL - INSTALLATION SERVICE - VIRTUAL 1 $300.00 $0.00 $300.00 Year 5 20379 AXON VR - PSO - FULL INSTALLATION - INSIDE SALES 1 $1,500.00 $0.00 $1,500.00 Year 5 BasicLicense Basic License Bundle 10 $1,950.00 $0.00 $1,950.00 Year 5 H00001 AB4 Camera Bundle 75 $0.00 $0.00 $0.00
Year 5 H00002 AB4 Multi Bay Dock Bundle 10 $0.00 $0.00 $0.00 Year 5 M00033 BUNDLE - OFFICER SAFETY PLAN 10 PLUS 75 $302,229.00 $9,350.75 $311,579.75 Year 5 ProLicense Pro License Bundle 1 $585.00 $0.00 $585.00 Total $306,564.00 $9,350.75 $315,914.75

Page 731 of 1440 ends
Page 8 ends

Tax is estimated based on rates applicable at date of quote and subject to change at time of invoicing. If a tax exemption certificate should be applied, please submit prior to invoicing.

Standard Terms and Conditions
Axon Enterprise Inc. Sales Terms and Conditions
Axon Master Services and Purchasing Agreement:

This Quote is limited to and conditional upon your acceptance of the provisions set forth herein and Axon’s Master Services and Purchasing Agreement (posted at https://www.axon.com/sales-terms-and-conditions), as well as the attached Statement of Work (SOW) for Axon Fleet and/or Axon Interview Room purchase, if applicable. In the event you and Axon have entered into a prior agreement to govern all future purchases, that agreement shall govern to the extent it includes the products and services being purchased and does not conflict with the Axon Customer Experience Improvement Program Appendix as described below.

ACEIP:

The Axon Customer Experience Improvement Program Appendix, which includes the sharing of de-identified segments of Agency Content with Axon to develop new products and improve your product experience (posted at www.axon.com/legal/sales-terms-and-conditions), is incorporated herein by reference. By signing below, you agree to the terms of the Axon Customer Experience Improvement Program.

Acceptance of Terms:

Any purchase order issued in response to this Quote is subject solely to the above referenced terms and conditions. By signing below, you represent that you are lawfully able to enter into contracts. If you are signing on behalf of an entity (including but not limited to the company, municipality, or government agency for whom you work), you represent to Axon that you have legal authority to bind that entity. If you do not have this authority, please do not sign this Quote.

Exceptions to Standard Terms and Conditions

Page 732 of 1440 ends
Page 9 ends

Agency has existing contract(s) originated via Quote(s):

Q-399569
Agency is terminating those contracts effective 9/15/2025 Any changes in this date will result in modification of the program value which may result in additional fees or credits due to or from Axon.

The parties agree that Axon is applying a Net Transfer Debit of $7,085.76 Any credits contained in this quote are contingent upon payment in full of the following amounts:

NA
100% discounted body-worn camera and docking station hardware contained in this quote reflects a TAP replacement for hardware purchased under existing quotes aforementioned above. All TAP obligations from this contract will be considered fulfilled upon execution of this quote. \s1\ \d1\
Signature Date Signed
6/12/2025

Page 733 of 1440 ends
Page 10 ends
Page 734 of 1440 ends

Item: 5.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Chad Blais, PW & Utility Services Director Item Name: Bond Release - DAP-001-800 - Approve Release of the Payment and Performance, and Maintenance Bonds for DAP-001-800 (Donut Star) at 736 W. Valley Blvd. – APN: 0162- 122-09 and 0162-122-10
Recommended Action:

Staff recommends that the City Council:

1. Authorize staff to release Payment and Performance Bonds, including any riders, for completed improvements for DAP-001-800 (Donut Star) located at 736 W. Valley Blvd. with APN: 0162-122-09 and 0162-122-10.

2. Authorize Staff to release Maintenance Bonds one full year after formal City acceptance of public improvements for DAP-001-800 (Donut Star) located at 736 W. Valley Blvd. with APN: 0162-122-09 and 0162-122-10.

Background:

On June 13, 2023, the Planning Commission of the City of Colton approved DAP-001-800, a Conditional Use Permit (CUP), an Administrative Architectural & Site Plan Review Application, and a Major Certificate of Appropriateness to allow the construction of a new 2,013 square foot donut shop with a drive-thru drive-up window (no menu boards proposed) and one (1) replacement 1,056 sf single family home with an attached 2-car garage on lot measuring 15,000 square feet and Zoned C-2 (General Commercial) and located in the Terrace Historic District.

Donut Star, the drive-thru donut shop is situated at 736 West Valley Boulevard.

Construction of the drive-thru donut shop and residential home is now complete, including applicable required public improvements. Final inspection was provided by the Public Works and Utility Inspector.

Page 735 of 1440 ends

Issues/Analysis:

Bond submittal as a means to guarantee construction of public improvements prior to the start of construction is a standard condition of approval for development projects in accordance with City policies and the Subdivision Map Act. Such public improvements include street, sewer, and drainage improvements. Per City of Colton Municipal Code § 16.56 and Chapter 5 of the Subdivision Map Act (SMA), the developer had the option to submit guarantees via formal Bonds or Cash in-lieu of Bonds. The developer opted to submit cash-in-lieu of Bonds for the required Performance and Labor and Materials Bonds, including Maintenance and Warranty.

Receipts are included as Exhibit A. Bond amounts are summarized as follows:

Bond Type Amount
Performance Bond $ 20,400.00
Labor and Materials (Payment) Bond $ 20,400.00
Maintenance and Warranty Bond $ 2,040.00
Total $ 42,840.00
Government Code Section 66499(b) authorizes the City Council to release bonds if the improvements are completed. The Maintenance and Warranty Bonds are required to remain in place for a period of one (1) full year as a warranty for the constructed public improvements.

The Payment and Performance Bonds (Cash in-lieu of Bonds) will be released/refunded immediately after City Council approval.

Fiscal Impacts:

There are no fiscal impacts to release the Payment and Performance Bonds. After Maintenance Bonds are released, funding for public improvements constructed through this project will be maintained by the Streets Division maintenance budget.

Alternatives:

1. Provide alternative direction to staff.

Attachments:

1. Exhibit A - Bonds (Cash In-lieu of)

Page 736 of 1440 ends

T B R CONCRETE
[email protected] (909) 550-9565
Engineering Estimate
Date: 12-14-2024
Encroachment Permit
Project Location: 736 E. Valley Blvd. , Colton
Item Description of Work Quantity Value Estimate
1 Remove & haul away existing curb
& gutter, driveway approach and
sidewalks
600 SF sidewalk
72 LF C&G
$3,700

2 New driveways, 23 ft. and 10 ft. 2new driveway
approach & aprons
$ 5,200

3 Repair/replace curb & gutter 81 LF $ 6,500
4 Replace new sidewalk 638 SF $ 5,000
TOTAL: $20,400
The cost of above work does not include other consultant cost such as traffic engineering, traffic control service, etc.

Page 737 of 1440 ends

Donut Star
811 W Valley Blvd
Colton, CA 92324-2001
Invoice Date: 1/28/2025
Record # Record Type Fee Account Group Fee Description Amount ENG24-0402 OFF SITE CONSTRUCTION FAITHFUL PERFORMANCE BOND

LABOR & MATERIALS (PAYMENT) BOND PUBLIC IMPROVEMENT
BONDS
762-2360-000 $20,400.00
$20,400.00
762-2360-000 $2,040.00
$42,840.00
Invoice Total: $42,840.00
Printed: Tuesday, January 28, 2025 5:38 PM 1 of 1
Please send your payment to this address: City of Colton 650 N La Cadena Dr
Colton, CA 92324
City of Colton
City of Colton
650 N La Cadena Dr
Colton,CA 92324
INVOICE #
I-7175
Date Due: 2/27/2025

MAINTENANCE & WARRANTY BOND
762-2360-000

Page 738 of 1440 ends

DESCRIPTION ACCOUNT QTY PAID
PermitTRAK $42,840.00
ENG24-0402 Address: 736 W VALLEY BLVD APN: 016212209 $42,840.00 PUBLIC WORKS STREET IMPROVEMENT OFF SITE CONSTRUCTION BONDS $42,840.00 FAITHFUL PERFORMANCE BOND 762-2360-000 0 $20,400.00
LABOR & MATERIALS (PAYMENT) BOND 762-2360-000 0 $20,400.00 MAINTENANCE & WARRANTY BOND 762-2360-000 0 $2,040.00
TOTAL FEES PAID BY RECEIPT: I7176 $42,840.00
Printed: Tuesday, January 28, 2025 5:49 PM
Date Paid: Tuesday, January 28, 2025
Paid By: DONUT STAR
Pay Method: CHECK 2242
1 of 1
Cashier: MP01
Cash Register Receipt
City of Colton
Receipt Number
I7176

Page 739 of 1440 ends
Page 740 of 1440 ends

Item: 6.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Chad Blais, PW & Utility Services Director Item Name: Budget Amendment - CR&R Disposal Services - Approve and Adopt a Resolution to amend the Fiscal Year 2024/2025 Public Works Budget for Solid Waste Professional Services and Streets Professional Services, RESOLUTION NO. R-54-25.

Recommended Action:

Staff recommends that the City Council take the following action:

Approve Resolution R-54-25 amending the FY 2024-2025 Public Works Budget to increase appropriations in the Solid Waste Professional Services Expenditure Account by $300,000 for Residential Refuse Services, and to increase appropriations in the Streets Professional Services Expenditure Account by $100,000 for Municipal Disposal Services.

Background:

In 2017 CR&R purchased the right to provide municipal solid waste collection services in the City of Colton from Republic Services. The terms and conditions of CR&R Municipal Solid Waste (MSW) service do not change from the original Franchise Agreement with Republic Services.

On December 20, 2022, City Council approved Resolution R-130-22 providing for annual adjustments in CR&R’s refuse collection rates. Pursuant to the Resolution there was a rate adjustment effective January 1, 2023, and another on July 1, 2023.

A Second Amendment to the agreement with CR&R was approved by City Council on July 16, 2024, that will extend the contract period, freeze residential rates through June 30, 2026, stipulate funding to the City, and provide various updates to other services.

Page 741 of 1440 ends

Issues/Analysis:

Refuse expenditures in the Solid Waste Professional Services fund exceeded the original budget projections for fiscal year 2024-25 due to unexpected legal fees. Additionally, the cost of the City’s Municipal Solid Waste service (Billable Tonnage) has risen due to increased cleanup requests for crime scene/homeless encampments, illegal dumping, and residential clean-up events (the City is allowed 300 free tons per fiscal year and is charged for any tonnage beyond that).

Therefore, staff is hereby requesting approval to increase appropriations for Fiscal Year 2024- 2025 by $400,000 to pay for CR&R monthly invoices, legal fees, and the municipal solid waste billable tonnage overages through June 30, 2025.

Fiscal Impacts:

Approval of R-54-25 will amend the FY 2024-2025 budget to:
• Increase appropriations in Solid Waste Fund Professional Services Account Number 523-6150-6163-2350-0000-000 by $300,000.
• Increase appropriations in Public Works Streets Professional Services Account Number 100-6150-6160-2350-0000-000 by $100,000.

Alternatives:

Provide alternative direction to staff.

Attachments:

1. Resolution R-54-25

Page 742 of 1440 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
- 1 -
RESOLUTION NO. R-54-25

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF COLTON, AMENDING THE FISCAL YEAR 2024/2025 ADOPTED BUDGET TO
APPROPRIATE ADDITIONAL FUNDS FOR UNEXPECTED REFUSERELATED EXPENSES WHEREAS, the budget for fiscal year 2024/2025 has been approved by City Council, and must now be amended to increase appropriations in the Public Works Solid Waste, and Streets Professional Services line items; and
WHEREAS, the increased funding will be utilized to pay for CR&R invoices for Residential Disposal Services and City Municipal Waste Services through the end of the fiscal year by amending their respective Professional Services Expenditure Accounts for fiscal year 2024/2025.

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF COLTON DOES HEREBY RESOLVE AS FOLLOWS:

Section 1 The City Council hereby amends the fiscal year 2024/2025 budget as follows:
• Increase appropriations by $300,000 in the Solid Waste Professional Services Account Number 523-6150-6163-2350-0000-000.
• Increase appropriations by $100,000 in the General Fund Streets Professional Services Account Number 100-6150-6160-2350-0000-000.

PASSED, ADOPTED AND APPROVED THIS 15TH DAY OF JULY 2025. ______________________________
FRANK J. NAVARRO
Mayor
ATTEST:

Page 743 of 1440 ends

1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
- 2 -
_____________________________
ISAAC T. SUCHIL
City Clerk

Page 744 of 1440 ends

Item: 7.

Staff Report
Meeting Date: July 15, 2025
To: City Council
From: Bill Smith, City Manager
Prepared By: Anthony Vega, Chief of Police
Item Name: Contract Award - AALRR - Approve the Contract Agreement with Atkinson, Andelson, Loya, Ruud & Romo (AALRR) for Professional Legal Services.

Recommended Action:

Staff recommends City Council:

1. Dispense with competitive bidding under Colton Municipal Code Section 3.08.140 (e) and approve a contract with Atkinson, Andelson, Loya Ruud & Romo (AALRR) for professional legal services related to personnel, labor relations, and administrative investigations for an amount not to exceed $800,000; and,

2. Authorize the City Manager to execute a three-year agreement with the option to renew for an additional three years.

Background:

Since 2019, AALRR has provided professional labor and employment legal services to the City of Colton through a contract with the Human Resources Department. Their services have supported successful labor negotiations, employment-related legal matters, and personnel investigations. City Council recently extended its contract with AALRR during the July 16, 2024 meeting.

Given the overlap in personnel and labor-related legal matters between departments, and AALRR’s established knowledge of the City’s policies, procedures, and labor environment, the Police Department seeks to leverage the existing relationship by “piggybacking” onto the current City contract.

Issues/Analysis:

The Police Department regularly requires legal services to address internal personnel investigations, labor and employment matters, and policy consultations. AALRR has a proven

Page 745 of 1440 ends
← All documents from this meeting