3-22-dp 03 30 00 – Cast-in-Place Concrete - 27 of 35
cracking, provide windbreaks, shading, fog spraying, or wet covering with light colored material in advance of concrete placement.

4. From initial placement through curing, protect concrete from adverse effects of high temperature, low humidity and wind.

5. Cool steel forms and reinforcement prior to concrete placement when steel temperatures exceed 120°F.

6. Cool conveying and placing equipment if necessary to maintain proper concrete placing temperature.

7. Shading of placing area shall be used if required.

V. Stop concrete placement when rainfall is sufficient to damage Work.

W. Prevent cold joints when placing concrete.

1. Concrete placing rate shall ensure each concrete batch is placed while previously placed underlying or adjacent batches of concrete are still plastic so both can be made monolithic by normal use of immersion vibrators.

2. If equipment breaks down or unavoidable prolonged interruptions of continuous placing causes unconsolidated concrete to harden to extent later vibration cannot fully consolidate concrete, immediately consolidate concrete to stable and uniform slope.

3. If delay of placement is then short enough to permit penetration of operating vibrator into concrete, resume placement, taking care to penetrate and re-vibrate concrete placed before delay.

4. If concrete cannot be penetrated with operating vibrator, stop placement and treat cold joint as construction joint if design requirements are such that construction joint is practical.

5. If construction joint will impair structural integrity, as determined by City’s Representative, repair concrete placed before delay as directed by City’s Representative.

6. Repairs in some instances will include removal of concrete placed before delay at Contractor’s expense.

X. Arrange ends of chutes, hopper gates, and other points of concrete discharge so concrete passing from them flows continuously into receiving vessel without separation.

1. Conveyor belts, if used, shall be wiped clean by device operated so mortar adhering to belt is not wasted and shall be of type acceptable to City’s Representative.

2. Chutes shall be ≤ 50’ long.

3. Slopes of chutes shall permit free and continuous flow of concrete being placed.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install concrete at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 19 “Concrete”

3. Other applicable building and CalGreen code requirements

4. ACI 301 Structural Concrete for Buildings Chapter 8.

5. ACI 318 Building Code Requirements for Reinforced Concrete

6. ACI 350 Code Requirements for Environmental Concrete Structures

7. Standard Specifications for Public Works Construction (Greenbook) §203, §302, and §303

8. City of Corona Standard Drawings:

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 499 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 28 of 35
a. Standard Drawing 310 for concrete slope anchors.

9. Manufacturer’s installation and warranty requirements

10. Standard Specifications for Public Works Construction (Greenbook) §303 “Concrete and Masonry Construction.”
D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Where concrete is to be deposited against hardened concrete at horizontal construction joints, begin placing operations by conveying grout mixture through placing system and equipment and depositing mixture on joint.

1. Grout mixture shall be non-shrink grout class 1 as defined in Section 03 60 00.

2. Aggregate shall be Class E as defined herein.

3. Use consolidation techniques to assure proper bond at joint.

F. Deposit concrete into forms as follows:

1. Provide equipment adequate to handle and place concrete with specified aggregate and slump.

2. Keep construction joint surfaces continuously wet for first 12 hours during 24-hour period before placing concrete.

3. Treat cold joints as specified for concrete construction joints in Section 03 15 00.

4. Remove free water before placing concrete.

5. To avoid segregation, deposit concrete as near to its final position as possible. a. Do not use vibrators for extensive shifting of mass of concrete. b. Do not place partially hardened or retempered concrete or concrete contaminated by foreign material into structure.

6. Place concrete in horizontal layers insofar as practical.

7. Begin placing at low point and proceed upgrade.

8. Place concrete in continuous operation between construction joints.

9. Once placement of concrete has begun in a location, do not interrupt placement by diverting placing equipment to other locations unless authorized.

10. Terminate placement with square ends and level tops unless otherwise shown.

11. Place concrete within time limit specified herein and in ASTM C94.

12. Concrete deliveries will be rejected if specified elapsed time from batching to placing is exceeded.

13. Provide sufficient placing capacity so concrete placement is kept plastic and free of cold joints while concrete is placed.

14. Vertical free fall drop shall be ≤4’ below ends of ducts, tremies, chutes or buggies except where suitable equipment is provided to prevent segregation, and where specifically accepted.

15. Tremies shall be ≥ 6” diameter or equivalent cross-section area for rectangular sections.

16. Do not place concrete in horizontal members or sections until concrete in supporting vertical members has been consolidated and 2 hours have elapsed to permit shrinkage to occur.

17. In no case shall concrete be displaced horizontally in forms by >6’ after depositing.

18. Do not drop concrete through reinforcing steel or into deep forms, nor place concrete in forms in manner permitting accumulation of mortar on surfaces above placed concrete.

19. If necessary, use hoppers or vertical ducts of canvas, rubber or metal to convey concrete to place of final deposit without separation or splashing.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 500 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 29 of 35

20. Depth of concrete deposited in each location shall be that which can be fully consolidated in uniform horizontal layers not exceeding 24” in thickness.

21. Place slabs 24” thick or less in 1 course.

22. Avoid inclined layers or inclined construction joints except where required for sloping members.

23. Place each layer while previous layer is still soft.

24. Rate of placement in forms shall be ≤5’ vertical rise per hour.

25. Time between successive lifts shall be defined as time elapsing from completion of 1 lift to start of placing next lift.
a. Unless otherwise accepted, time between successive lifts shall be ≥72 hours.

G. Concrete in ramps and sloping slabs shall be placed uniformly from bottom to top for full width of placement.

1. As Work progresses, vibrate concrete and work it around reinforcement.

2. Screed ramp surface in up-slope direction.

H. Consolidate encasement concrete around duct banks by hand puddling.

1. Do not use mechanical vibration around electrical raceways.

I. Settle, compact and consolidate concrete in forms or excavations throughout depth of concrete layer being placed to produce surface of uniform texture free of rock pockets and excessive voids.

1. Immediately after placement, consolidate each concrete layer using internal vibrating equipment.

2. Do not use vibrators to transport or move concrete within forms. a. If necessary, use hand spading with internal vibrating along formed surfaces permanently exposed to view.

3. Do not use form or surface vibrators unless specifically accepted.

4. Consolidate concrete into dense, homogeneous mass.
a. Work concrete into form corners and angles of forms and around reinforcement and embedded items, eliminating rock pockets without causing concrete materials to segregate, while bringing only a slight excess of water to exposed concrete surface during placement.

5. Use power vibrators of immersion type in sufficient number to accomplish specified results within 15 minutes after concrete is deposited.

6. Vibration shall be accomplished by vertically inserting vibrator into fresh concrete at uniform spacing over full placement area.

7. Distance between insertions shall be approximately 1½ times radius of action of vibrator and overlap adjacent, just vibrated areas by a few inches.

8. Vibrators shall penetrate rapidly to bottom of layer, and slightly into layer below, when fresh.

9. Hold vibrators stationary momentarily, then withdraw slowly so concrete consolidates from bottom upward as entrapped air is removed.

10. Use 2 or more units simultaneously when placing >25 CY. a. Backup vibrator shall be onsite for each in use.

11. Vibrators for structural concrete shall be Group 3 (2”-3½” head, 8,000-12,000Hz, 0.025-

0.05” amplitude) per ACI 309R.

12. Group 2 (1¼”-2½” 8,500-12,500Hz, 0.02”-0.04” amplitude) vibrators may be used only at specific locations when accepted by City’s Representative.

13. When placing concrete around waterstops, carefully rod and vibrate concrete to eliminate air and rock pockets.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 501 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 30 of 35
a. Where flat-strip waterstops are placed horizontally, work concrete under waterstops by hand.
b. Concrete surrounding waterstops shall receive additional vibration over and above that used for adjacent concrete to assure full embedment of waterstops in concrete.

14. Internally vibrate concrete in walls and columns and at same time, ram, stir, or work with suitable appliances, tamping bars, shovels, or forked tools until it completely fills forms or excavations and closes snugly against surfaces.
a. Do not place subsequent layers of concrete until previously placed layers have been worked thoroughly.
b. Keep vibrating head from contact with form surfaces.

15. Do not vibrate concrete excessively or work it in any manner causing segregation of constituents.

16. Perform vibration at each required pour window opening in form walls.

17. Accepted external vibrators will be permitted when concrete is inaccessible to internal vibration.

J. Horizontal surfaces of concrete shall be level whenever run of concrete is stopped.

1. To ensure level, straight joint on exposed surfaces of walls, tack wood strip ≥¾” thick to forms on these surfaces.

2. Carry concrete about ½” above underside of strip.

3. One hour after concrete is placed, remove wood strip.

4. Using trowel, remove irregularities in edge formed by strip, and remove laitance.

K. Do not backfill against walls until concrete has obtained 100% of specified 28-day compressive strength.

3.3 Field Quality Control
A. Refer to the following sections for additional field testing and inspection requirements:

1. Section 03 10 00 for field testing and inspection of formwork and finish dimensions

2. Section 03 15 00 for field testing and inspection of concrete accessories, waterstops and joints.

3. Section 03 20 00 for field testing and inspection of steel reinforcement.

4. Section 03 35 00 for field testing and inspection of concrete finishing.

5. Section 03 39 00 for field testing and inspection of curing.

6. Section 05 12 00 for field testing and inspection of embedded steel bolts.

B. CBC Chapter 17 special inspection shall only be required for Class AA “premium” concrete, Class A “structural” concrete and concrete having specified compressive strength f’c >2500 psi.

C. Maintain placing record on-site showing time and date of placement of concrete having specified compressive strength f’c >2500 psi as required in CBC §1705.3.2.

D. Special inspection and field testing of Class AA and Class A concrete required by Chapter 17 of CBC (Table 1705.3) shall be completed by ICC-certified special inspector selected by City and shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Class AA
Concrete,
Class A
Concrete and
Concrete
Design Mix
Verification
ACI 318, Ch 19 & §26.4.3 &

26.4.4 Periodic per CBC
Table 1705.3
City Contractor
to
reimburse
City for
costs of
Slump ACI 318 §26.4.5, §26.12, ASTM
C31, ASTM C172
Slump per ASTM C143
Continuous per
CBC Table
1705.3 taken at at
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 502 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 31 of 35

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
having f’c
>2500 psi
Air Content ACI 318 §26.4.5, §26.12, ASTM
C31, ASTM C172
Air content per ASTM C173 or
C231
¼ point and ¾
point of batch and
at time fresh
concrete is
sampled to
fabricate
cylinders for
strength tests
first
deputy
inspector
if reinspection
required
Temperature ACI 318 §5.6& 5.8, ASTM C31,
ASTM C172, ASTM C1064
Proper Placement
of Concrete
ACI 318 §26.4.5 Continuous per
CBC Table
1705.3
Verification of insitu Concrete
Strength Prior to
Removal of
Shores and
Forms
ACI 318, §6.10.2
See below for concrete strength
test requirements
Periodic per CBC
Table 1705.3
Precast
Concrete
Members
Erection Contract Documents, ACI 318,
Ch. 16
Periodic per CBC
Table 1705.3
E. Additional field testing of concrete shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Concrete
Materials
Coarse and Fine
Aggregate
Sampling per ASTM D75.

Sieve analysis and fineness
1 test during each
shift in which
Contractor Contractor
(Concrete Gradation modulus per ASTM C136 concrete is
Production on produced on site.

Site) Coarse and Fine ASTM C566 1 morning test Contractor Contractor Aggregate per day.

Moisture Content
Coarse and Fine ASTM C127 (Coarse) 1 test per week Contractor Contractor Aggregate ASTM C128 (Fine)
Specific Gravity
and Absorption
(SSD)
Coarse and Fine
Aggregate
ASTM C33 1 test per week Contractor Contractor
Deleterious
Substances
Coarse
Aggregate Flat
ASTM D4791 1 test per week Contractor Contractor
and Elongated
Particles
Fine Aggregate ASTM C2419 1 test per week Contractor Contractor Sand Equivalent
Value
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 503 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 32 of 35

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Batch-Plant
Control
Monitor and control proportioning
of cement, SCMs, each size
aggregate, water, and admixtures
.Adjust aggregate weights and
amount of added water to
compensate for free moisture in
aggregates.

Adjust water content to produce
specified slump.

Adjust air-entraining admixture to
maintain air content within
specified limits.

Continuous Contractor Contractor
Weighing
Equipment
Accuracy
ASTM C94 1 test per 6
months or
whenever
variations in
properties of
fresh concrete
are detected
Contractor Contractor
Concrete Air Content and
Unit Weight
ASTM C138 or ASTM C231 1 morning test
per day or every
250cy increment
whichever is
stricter.

Contractor Contractor
Slump ASTM C143
No test shall exceed specified
rejection limit.

Average value of all tests shall be
≤ specified working limit.
1 morning test
per day or every
250cy increment
whichever is
stricter.

Contractor Contractor
Air and Concrete
Temperature
ASTM C1064, Concurrent with
slump tests and
as directed
Contractor Contractor
Concrete
Compressive
Strength f’c
Trial Batch
Sample
Preparation
1 st 5 cylinder tests at 7 days
2 nd 5 cylinder tests at 28 days
3 drying
shrinkage
samples and 10
compression test
cylinders for each
class or mix of
concrete used
Contractor Contractor
Cylinder
Sampling
ASTM C172 Sample each 100
cy concrete and
each separate
mix design placed
on any day
Contractor Contractor
Trial-Batch and
Field-Trial
Cylinder Testing
of Compressive
Strength f’c
Field Cylinders per ASTM C31
§9.2
Make ten 6”
diameter x 12”
high cylinders
1 st tests
(2 cylinders)
at 7 days
2 nd test
(2 cylinders)
at 28 days
Contractor Contractor
Laboratory Cylinders per ASTM
C192
Testing per ASTM C39 Conform
to table below
Evaluation per ACI 214 & ACI 318
Chapter 5 “Concrete Quality”
Field Cylinder
Testing of
Make Field Cylinders per ASTM
C31 §9.2
Make ≥ ten 6”
diameter x 12”
City Contractor
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 504 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 33 of 35

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Compressive
Strength f’c
Test per ASTM C39 Average of 2
cylinders
high cylinders per
250 cy concrete
and separate mix
design placed on
any day
1 st tests
(2 cylinders)
at 7 days
2 nd test
(2 cylinders)
at 28 days
Save remaining
cylinders to verify
test results as
directed.

Evaluation per ACI 214 & ACI 318
Chapter 5 “Concrete Quality”
Standard deviation of test results
from same mix and duration shall
be ≤640 psi.

Average of any 3 consecutive
tests shall be ≥ specified 28-day
strength
≥90% of tests shall be ≥ specified
28-day strength
No test shall be <85% of specified
28-day strength
Test Core
Testing of
Compressive
Strength f’c
Take test cores per ASTM C42 if
minimum strengths fall below
those specified.
3 cores per test
as directed
Contractor Contractor
Concrete tested by coring shall be
acceptable if average f’c of 3
cores ≥85% of specified f’c and
no single core strength <75% of
specified f’c.

Penalty clauses may be assessed
as described under Unit Prices for
concrete failing to meet full
specified strength.

Concrete Flexural Strength ASTM C78 As directed Contractor Contractor Unit Weight Yield ASTM C138 As directed Contractor Contractor Drying Shrinkage California Test 530 As directed Contractor Contractor

Finished
Concrete
Dimensional
Tolerance,
Refer to Section 03 35 00 Inspection at
City’s discretion
City City
Footing
Dimensional
Tolerance
ACI 117 Inspection at
City’s discretion
City City
Surface Defects Refer to Section 03 35 00 Inspection at City’s discretion
City City
Cracking in
Flatwork and
Non-Waterbearing
Structures
Refer to Section 03 35 00 Inspection at
City’s discretion
City City

Concrete 11-month
Warranty
Inspection
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed literature
1 test City Contractor
F. Refer to Section 03 10 00 for tolerances of finished concrete.

G. Trial-batch testing and field-trial testing of concrete cylinders shall proceed as follows:

1. Before placing concrete, testing laboratory designated by City’s Representative shall prepare trial batch of each class of “structural” or “premium” concrete based on preliminary concrete mixes submitted by Contractor and using aggregates, cement and admixtures proposed.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 505 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 34 of 35

2. During trial-batch, testing laboratory may adjust aggregate proportions to obtain required properties.
a. Such adjustments shall be considered refinements to mix design and shall not justify extra compensation to Contractor.

3. All concrete shall meet specified requirements whether aggregate proportions are from Contractor’s preliminary mix design, or whether proportions have been adjusted during trial batch process.

4. Trial-batch materials shall be sufficient to yield 3 drying shrinkage and 10 compression test specimens from each batch.

5. Test 5 cylinders at 7 days to establish 7-day average compressive strength.

6. Test remaining 5 cylinders ≤28 days after molding.

7. Required average compressive strengths shall be:

SPECIFIED

COMPRESSIVE
STRENGTH (f’c)
28-DAY LABORATORY TRIAL-BATCH

COMPRESSIVE STRENGTH MINIMUM

TEST RESULTS
28-DAY FIELD-TRIAL TEST

COMPRESSIVE STRENGTH MINIMUM

TEST RESULTS
5-CYLINDER

AVERAGE

ANY SINGLE
TEST
5-CYLINDER

AVERAGE

ANY SINGLE TEST
0 < f’c < 3000 psi f’c +1000 psi f’c f’c + 600psi f’c
3000 psi ≤ f’c < 5000
psi
f’c +1200 psi f’c f’c + 600psi f’c
5000 ≤ f’c f’c +1400psi f’c f’c + 600psi f’c

8. Do not place “structural” or “premium” concrete until mix design has been qualified under test criteria above.
a. Should source of materials or established procedures change, City will require new trial batch testing.

9. Field trial batches may be placed in Work at designated locations accepted by City’s Representative where concrete of lower quality is required. a. For payment purposes, concrete so placed will be considered to be type of concrete specified at that location.

10. Furnish concrete samples for batch testing in steel drums at no cost to City.

11. In lieu of trial-batch testing, Contractor may submit previously designed, tested and successfully used concrete mixes using materials similar to those intended for Work, together with ≥3 certified test reports of 28-day strength of proposed concrete mix.

H. Specified frequency of tests may be increased at City’s Representative’s discretion where excessive variation in concrete properties is observed during construction.

I. Contractor-hired personnel sampling and testing concrete and concrete constituents shall have ACI certification for Concrete Field Testing Technician Grade I.

J. Laboratory used for field testing shall conform to ASTM C1077.

1. If directed by City’s Representative, remove from Work and replace laboratory equipment not acceptably maintained.

K. Contractor shall provide concrete for testing at no charge to City, and shall assist City’s Representative and laboratory personnel in obtaining samples, and disposal and cleanup of excess material.

L. Statistical analysis of compression test results will be performed according to ACI 214.

1. Standard deviation of test results shall not exceed 640 psi when ordered at equivalent water content as estimated by slump.

2. When said standard deviation > 640 psi, increase average strength for which mix is designed as needed to satisfy statistical requirement that:
a. Probability of any test being >500 psi below specified strength <1%.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 506 of 2077 ends

3-22-dp 03 30 00 – Cast-in-Place Concrete - 35 of 35
b. Probability of average of 3 consecutive tests being below specified strength <1%. c. Required average strength shall be calculated using Criterion Number 3 of ACI 214 using actual standard deviation.

M. Concrete which fails to meet ACI requirements and these Specifications is subject to removal and replacement at no cost to City and shall be disposed of as required by law.

N. In lieu of removing and replacing slightly deficient concrete having 85% or more of specified strength, City may, at their sole discretion, elect to reduce payment due to Contractor for substandard concrete as described in Caltrans Standard Specification §90-9 “Compressive Strength.”

3.4 Cleaning
A. Wash out chutes, shovels, finishing trowels and other equipment that has been in contact with wet concrete at a designated concrete washout area.

B. Do not discharge or deposit wet concrete, debris, or other concrete washout effluent on bare ground, on area tributary to storm drain or natural channel or into storm drain facility.

C. Dispose of concrete and concrete waste in accordance with pollution prevention laws and regulations.

D. Refer to Section 01 74 00 for cleanup and disposal requirements.

3.5 Protection
A. Protect concrete against injury until final acceptance by City.

B. Protect fresh concrete from damage due to impact, overstress, vandalism and weather, including precipitation or extremes in temperature or humidity until final acceptance.

C. New concrete not complying with these specifications shall be repaired or removed and replaced prior to final acceptance except where City agrees to reduce payment as described above.

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 507 of 2077 ends

1-22-dp 03 32 10 – Cement Mortar - 1 of 5
SECTION 03 32 10

CEMENT MORTAR
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of cement mortar.

B. Refer to the following sections for Work not covered herein.

1. Section 03 30 00 for cast-in-place concrete.

2. Section 04 05 00 for masonry mortaring and grouting.

C. Conform to Standard Specifications for Public Works Construction (Greenbook) §201-5, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 03 30 00: Cast-in-Place Concrete
J. Section 31 23 00: Excavation and Fill

1.3 System Description
A. Furnish and install cement mortar in compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Factory testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Mortar
Mix
Compressive
Strength,
Consistency, Mortar
Aggregate Ratio,
Water Content, Air
Content, Splitting
Tensile Strength
and Slump
ASTM C780 1 each batch Contractor Contractor

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ASTM C33 Concrete Aggregates

2. ASTM C40 Organic Impurities in Fine Aggregates for Concrete

3. ASTM C109 Compressive Strength of Hydraulic Cement Mortars DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 508 of 2077 ends

1-22-dp 03 32 10 – Cement Mortar - 2 of 5

4. ASTM C150 Portland Cement

5. ASTM C191 Time of Setting of Hydraulic Cement by Vicat Needle

6. ASTM C266 Time of Setting of Hydraulic Cement Paste by Gillmore Needlesaw

7. ASTM C289 Potential Alkali-Silica Reactivity of Aggregates (Chemical Method)

8. ASTM C780 Preconstruction and Construction Evaluation of Mortars for Plain and Reinforced Unit Masonry

9. California Building Code (CBC)

10. California Fire Code (CFC)

11. California Green Building Code (CALGreen Code)

12. California Test Method 229 Durability

13. California Test Method 515 Relative Mortar Strength of Portland Cement Concrete Sand

14. NSF/ANSI 61 Drinking Water System Components – Health Effects

15. SSPWC Standard Specifications for Public Works Construction (Greenbook) §201-5 “Cement Mortar”

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.

Installation Instructions Submit per Installation or Application Instruction requirements.

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of Compliance Submit coating system and application certification per Certificate of Compliance requirements.

Test Record Transcripts Submit for factory tests per test record transcript requirements.

Delivery Tickets Submit as required for payment.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance.

B. Refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, Certificates of Compliance, and Test Record Transcripts.

1.7 Delivery, Storage and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instruction and warranty requirements for delivery, storage and handling of cement mortar.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Refer to Standard Specifications for Public Works Construction (Greenbook) §201-5 for materials requirements for cement mortar.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 509 of 2077 ends

1-22-dp 03 32 10 – Cement Mortar - 3 of 5
C. Cement mortar shall be constructed of:

ITEM MATERIAL SPECIFICATION
Cement Standard Brand
Portland Cement
Conform to ASTM C150 including optional requirements of Table 2 for maximum equivalent alkalis (Na2O+0.658K2O of 0.60%
Type II Modified Low Alkali
Type II/V Modified Low Alkali/Sulfate Resisting
Type III High Early Strength
Type IV Low Heat of Hydration
Type V Sulfate Resistant
Also conform to Table 2 optional requirements
At least 85% of cement by weight shall pass 325 screen.

Sand Specification Conform to ASTM C33
Nonreactive clean, hard durable washed material
From pits acceptable to City’s Representative
Aggregate shall be of character to facilitate producing workable concrete mixture within limits of specified water content and slump.

Organic Impurities
per ASTM C40
Satisfactory
Resultant color of testing solution shall not be darker than ASTM C40 standard
Free Moisture
Content
≤8% at time of batching
Mortar Strength
Relative to Ottawa
Sand per California
Test Method 515
≥100%
Sand Equivalent >75% average for 3 samples
>70% for any 1 sample
Percent Clay, Silt,
Loam per ASTM
C117
<3%
Soundness per
California Test
Method 214
<10%
Soundness requirement will be waived if durability index Df>60 per California Test Method 229.

Ratio of silica
released to
reduction in
alkalinity
<1.0
Weight Lightweight sand not permitted
Reactivity Nonreactive when tested per ASTM C289 and evaluated per ASTM C33 Appendix X1
Water Clean, Clear
Potable Water
TDS≤1000 mg/l
Admixtures Do not use admixtures unless accepted by City’s Representative.

D. Mortar sand shall conform to gradation below. (Refer to Standard Specifications for Public Works (Greenbook) Table 200-1.5.5).

PERCENTAGE PASSING SIEVES BY WEIGHT

SIEVE SIZE ASPHALT CONCRETE SAND GRADATION
#4 100%
#8 95-100%
#16 70-95%
#30 35-70%
#50 5-35%
#100 0-10%
#200 0-5%
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 510 of 2077 ends

1-22-dp 03 32 10 – Cement Mortar - 4 of 5
E. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION
Mortar 2-Component
Cement Based
Product
Low shrinkage.

Designed for repairing damaged concrete surfaces.

Use medium slump repair mortar on horizontal surfaces.

Use non-sag low-slump repair mortar on vertical or overhead surfaces.

Class A Mortar 1 part Portland cement – 1 part fine aggregate Class B Mortar 1 part Portland cement – 1½ parts fine aggregate Class C Mortar 1 part Portland cement – 2 parts fine aggregate Class D Mortar 1 part Portland cement – 2½ parts fine aggregate Class E Mortar 1 part Portland cement – 3 parts fine aggregate Class F Mortar 1 part Portland cement – 3½ parts fine aggregate Concrete Repair
Mortar
Class C with Atlas white Portland cement added as needed so patch matches finish.

Water Add precise amount of water needed to produce required strength and workability
PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to install cement mortar before ordering.

1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Examine areas and conditions under which Work of this section will be performed.

1. Correct conditions detrimental to timely and proper completion of Work.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install cement mortar at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code

3. Other applicable building, fire, plumbing, mechanical and electrical code requirements

4. Manufacturer’s installation and warranty requirements

5. Standard Specifications for Public Works Construction Section 201-5 “Cement Mortar” D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Install cement mortar to tolerances recommended by Manufacturer.

1. Unless otherwise shown, install cement mortar true, plumb, and level using precision gauges and levels.

F. Installation of cement mortar shall pay particular attention to the following:

1. Use mortar as soon as possible after mixing.

2. Mortar shall show no visible signs of setting prior to use.

3. Do not re-temper mortar.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 511 of 2077 ends

1-22-dp 03 32 10 – Cement Mortar - 5 of 5

3.3 Field Quality Control
A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Cement
Mortar
Installation Visual inspection of finished
installation
1 inspection City City
Setting of Mortar ASTM C191 or C266 As directed Contractor Contractor Mortar Cube Test California Test 515 As directed Contractor Contractor Field Performance Demonstrate compliance to
Contract Documents and
Manufacturer’s printed literature
1 test Contractor Contractor
11-month Warranty
Inspection
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed literature
1 test City Contractor

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 512 of 2077 ends

2-22-dp 03 39 00 – Concrete Curing - 1 of 6
SECTION 03 39 00

CONCRETE CURING
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and curing of concrete.

B. Refer to the following sections for Work not covered herein.

1. Refer to Section 03 30 00 for cast-in-place concrete.

C. Conform to Standard Specifications for Public Works Construction (Greenbook) §201-4, 303-1.10, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 03 30 00: Cast-in-Place Concrete
I. Section 03 60 00: Grouting
J. Section 09 90 00: Painting and Coating
K. Section 31 05 23: Cement and Concrete Conforming to Greenbook Specifications

1.3 System Description
A. Furnish and install pigmented curing compound which when applied to fresh concrete will form continuous membrane over exposed surface.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. AASHTO M182 Burlap Cloth Made from Jute or Kenaf and Cotton Mats

2. ASTM C31 Making and Curing Concrete Test Specimens in Field

3. ASTM C156 Water Retention by Concrete Curing Materials

4. ASTM C171 Sheet Materials for Curing Concrete

5. ASTM C192 Making and Curing Concrete Test Specimens in Laboratory

6. ASTM C309 Liquid Membrane-Forming Compounds for Curing Concrete

7. California Building Code (CBC)

8. California Green Building Standards Code (CALGreen Code)

9. Fed Spec UU-B-790A Building Paper, Vegetable Fiber (Kraft, Waterproofed, Water Repellent and Fire Resistant

10. NSF/ANSI 61 Drinking Water System Components – Health Effects

11. SSPWC Standard Specifications for Public Works Construction (Greenbook) §201-4 “Concrete Curing Materials

12. SSPWC Standard Specifications for Public Works Construction (Greenbook) §303-1.10 “Curing.” DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 513 of 2077 ends

2-22-dp 03 39 00 – Concrete Curing - 2 of 6

1.6 Submittals
A. Furnish the following submittals in accordance with ACI 301 and California Building Code.

SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit for curing compounds per Product Data requirements.

Installation Instructions Submit materials and methods for curing per Installation Instruction requirements.

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of
Compliance
For impervious sheet curing materials, submit Certificate of Compliance with ASTM C171.

For curing compounds, submit Certificate of Compliance with ASTM C309.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. In addition to requirements of ACI, refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, and Certificates of Compliance.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow ASTM C309 and Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of curing compounds.

C. At time of use, maintain pigmented curing compounds in thoroughly mixed condition.

D. Store materials in air-tight containers when not in use.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Curing Blankets Reef Industries Houston, TX (800) 231-6074 Sika Corporation Lyndhurst, NJ (800) 325-9504
Accepted equal
Curing Compounds
(Water-Based Resin Type)
Use where air quality
regulations prohibit use of
solvent based compounds
Edoco “Aqua Resincure” Long Beach, CA (310) 834-3401
Euco Euclid Chemical Co / RPM “Aqua-Cure” VOX Cleveland, OH (800) 321-7628 L M Scofield Company “Cureseal W®” Los Angeles, CA (800) 800-9900 Master Builders / BASF “Masterkure-WB” Beachwood, OH (800) 228-3318 W R Meadows SealTight VoComp®20 Hampshire, IL (800) 342-5976 Accepted equal
Evaporation Retardant for
Curing
Euco Euclid Chemical Co / RPM “Eucobarl” Cleveland, OH (800) 321-7628 Master Builders / BASF (Confilm) Beachwood, OH (800) 228-3318 Accepted equal
B. Curing compounds shall be compatible and supplied by 1 Manufacturer capable of providing qualified field service representation.

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Refer to Standard Specifications for Public Works Construction (Greenbook) §201-4 for materials requirements for concrete curing materials.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 514 of 2077 ends

2-22-dp 03 39 00 – Concrete Curing - 3 of 6
C. Materials for concrete curing shall be:

ITEM MATERIAL SPECIFICATION
Curing
Compounds
Conform to ASTM C309 Class B (Resin-type only)
Liquid shall form continuous membrane over exposed concrete surfaces when applied to fresh concrete.

Do not use sodium silicate compounds.

Water loss ≤ 0.15kg/m2 in 24 hours per ASTM C156
Water loss ≤ 0.45kg/m2 in 72 hours per ASTM C156
SSPWC (Greenbook) §204-1 Type 1D clear or translucent with fugitive dye
Sheet Curing
Materials
Type 1 Waterproof Paper Conform to ASTM C171
With white polyethylene sheeting
2- mil nominal PE thickness
Permanently bond to waterproof paper per Fed Spec UU-B-790A Loss of moisture per ASTM C156<0.055 grams/cm2
Type 2 Polyethylene Film White opaque
10-mil nominal PE thickness
Loss of moisture per ASTM C156<0.055 grams/cm2
Type 3 White-Burlap
Polyethylene Sheet
Conform to AASHTO M182
White opaque polyethylene film impregnated or extruded onto 1 side of burlap
4-mil nominal PE thickness
Burlap weight 9oz/yd2
Loss of moisture per ASTM C156 <0.055 grams/cm2
Type 4 Burlap Weight ≥ 10 oz/yard 40” wide
Curing Mats Heavy Shag Rugs,
Carpets or Cotton Mats
Quilted at 4” on center
Dry weight ≥12 oz/sy
Curing Water Shall not contain substances that stain or injure concrete.

D. Materials furnished for Work shall conform to requirements of ACI 301 §201, §203, and §204 as applicable.

PART 3 - EXECUTION

3.1 Preparation
A. Materials and equipment needed for curing and protection shall be on- site prior to start of concrete placement.

B. Protect uncured concrete from exposure to rain for 12 hours.

1. Protect uncured concrete from exposure to runoff or groundwater for 14 days.

C. When recorded peak ambient temperature >85°F and is forecast to reach 85°F on consecutive days, shield concrete from direct sunlight for 3 days.

D. Do not expose uncured concrete to fire or excessive heat E. Surface defect repairs that cannot be made within 2 hours following form removal shall be delayed until after curing compound has been applied.

F. Cover and protect construction joints, shear planes, reinforcing steel and surfaces requiring bond as needed to prevent deposits or overspray of curing compound.

3.2 Installation/Application
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 515 of 2077 ends

2-22-dp 03 39 00 – Concrete Curing - 4 of 6

2. California Building Code Chapter 19 “Concrete”

3. Other applicable building and CalGreen code requirements

4. ACI 301 Structural Concrete for Buildings Chapter 8.

5. ACI 305R Hot Weather Concreting

6. ACI 318 Building Code Requirements for Reinforced Concrete

7. ACI 350 Code Requirements for Environmental Concrete Structures

8. Manufacturer’s installation and warranty requirements

9. Standard Specifications for Public Works Construction §303-1.10 “Curing.” C. Refer variances between above documents and Contract Documents to City’s Representative.

D. Cure finished surfaces using methods and duration similar to that for adjacent concrete.

E. If fresh concrete may check or crack prior to commencement of curing due to weather, materials used, or other reasons, keep concrete damp but not wet using indirect fine water spray until it is unlikely checking or cracking will occur, or until curing commences.

F. Concrete curing shall proceed as follows:

SURFACE DESCRIPTION
Unstripped
Forms
Method 1: Wet wood forms completely after concrete has been placed, and keep wet with water until forms are removed.

For steel forms, keep exposed concrete surfaces continuously wet until forms are removed.

If forms are removed within 14 days of placing concrete, continue curing as described for surfaces with forms removed
Construction
Joints between
Footings &
Walls
Method 2 (Moist Curing): Cover surface with at least 2 layers burlap or cotton mats.

Wet mats with water for duration of 14-day curing period until concrete in walls has been placed.

Horizontal non-architectural flatwork, including roadways, slabs, curbs, and walks may also be watercured by ponding or by covering with 2” of saturated sand in lieu of burlap or cotton mats.

Do not apply curing compound to joint surfaces.

Encasement
Concrete
Method 3: Cover surface with moist earth 4 to 24 hours after concrete is placed.

Earthwork operations that may damage concrete shall not begin until ≥7 days after concrete is placed.

Concrete
Surfaces not
Described
Elsewhere
Method 2 (Moist Curing) (described above)
Method 4 (Curing Compounds): As soon as concrete hardens enough to prevent marring on unformed surfaces, and within 2 hours after form removal, spray surface with 2 coats liquid curing compound at minimum 75-psi pressure and uniform coverage of ≤400ft2/gallon each coat.

Apply first coat as soon as finished concrete surface reaches uniformly damp appearance with no free water on surface.

Allow first coat to dry up to 4 hours, then apply 2nd coat perpendicular to 1st coat.

Respray concrete surfaces subjected to rainfall within 3 hours after curing compound application by method and at coverage specified.

Protect concrete surfaces to which curing compound is applied for duration of curing period from pedestrian and vehicular traffic or causes that will disrupt continuity of curing membrane.

Do not damage seal during curing.

If seal is damaged or broken, reapply curing compound over damaged portion.

Where curing compound is accidentally applied to surfaces against which concrete is to be subsequently placed, remove curing compound by wet sandblasting just before placing new concrete.

Where concrete is placed adjacent to panel coated with curing compound, apply curing compound to previously coated panel areas within 6’ of joint and apply to other locations where curing membrane is disturbed.

Following curing, remove visible traces of curing compound without damaging surface finish.

Appearance is a primary consideration for concrete surfaces exposed to view.

Apply curing compound evenly on these surfaces.

Repair variations in shade, color or tint, resulting from uneven application of curing compound.

Floor Slabs on
Grade
Method 5 (Curing Blankets): Before curing medium is applied, keep entire surface damp using nozzles that atomize flow so surface is not marred or washed.

Apply curing material using Method 4 (Curing Compounds) described above.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 516 of 2077 ends

2-22-dp 03 39 00 – Concrete Curing - 5 of 6

SURFACE DESCRIPTION
After 1 hour but not more than 4 hours after applying curing material, wet surface with water delivered through fog nozzle.

Place concrete curing blankets on slab, with edges butted together and with joints between strips sealed with 2” wide strips of sealing tape or with edges lapped at least 3” and fastened with waterproof cement to form continuous watertight joint.

During first 3 days of curing, do not permit traffic or depositing of materials on curing blankets.

After 3 days, traffic or material deposits shall only occur on top of ⅝” minimum plywood sheets laid over curing blankets.

Leave curing blankets in place for ≥14 days.

Add water under curing blanket as necessary to maintain damp concrete surfaces.

Do not remove curing blankets until concrete for adjacent Work has been placed.

Should curing blankets tear or become damaged, replace damaged sections.

G. Dispose of excess curing water in manner that avoids damage to Work.

H. Hot-weather curing shall proceed as follows:

1. If surface moisture evaporation rate as determined by nomograph in ACI 305R, is expected to be >0.2 psf per hour such as to cause plastic shrinkage cracking, make provision for windbreaks, shading, fog spraying, or wet covering with light colored material in advance of placement.

2. Take such protective measures as quickly as finishing operations allow.

I. Allow concrete to cure ≥14 days before applying architectural finishes.

3.3 Field Quality Control
A. Refer to Section 03 30 00 for field testing and inspection of concrete.

B. Special inspection and field testing of Class AA and Class A concrete required by Chapter 17 of CBC (Table 1705.3) shall be completed by ICBO-certified special inspector selected by City and shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Class AA
Concrete, Class
A Concrete and
Concrete having
f’c exceeding
2500 psi
Curing
Temperature
and
Techniques
ACI 318 §26.4.7-26.4.9 Periodic per CBC
Table 1705.3
City Contractor to
reimburse
City for costs
of first
deputy
inspector if
re-inspection
is required
Curing
Compound
Mixing
Verification
Verify curing compound has
been mixed before spraying
As directed City City
Local
Application
Rate
Within 50ft2 per gallon of
specified rate per California
Test 535
As directed Contractor Contractor
Average
Application
Rate
Within 25ft2 per gallon of
specified rate per California
Test 535
As directed Contractor Contractor
Curing Period Moist Curing Record surface moisture
conditions in daily log
1 inspection per day Contractor Contractor
ImperviousSheet Curing Record condition of
covering and tightness of
laps and tapes in daily log
1 inspection per day Contractor Contractor
Hot-Weather
Protection
Record temperature in daily
log
1 inspection per day
and hourly for 1st 24
hours upon removal
of protection
Contractor Contractor
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 517 of 2077 ends

2-22-dp 03 39 00 – Concrete Curing - 6 of 6

3.4 Protection
A. Protect concrete against injury until final acceptance by City.

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 518 of 2077 ends

1-22-dp 03 60 00 - Grouting - 1 of 10
SECTION 03 60 00

GROUTING
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of cement grout, quick-setting grout, dry-pack grout, nonshrink grout, topping grout, structural repair grout, and pressure grouting other than for masonry.

B. Use quick setting grouts for setting posts and anchors in concrete or masonry.

C. Use non-shrink grout for setting bearing plates.

D. In places of high temperature or fire hazard, use non-shrink grout Class I, and not Class II.

E. Conform to Standard Specifications for Public Works Construction (Greenbook) §201-7, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 03 30 00: Cast-in-Place Concrete
J. Section 03 39 00: Concrete Curing
K. Section 05 05 19: Post-Installed Concrete Anchors
L. Section 09 90 00: Painting and Coating

1.3 System Description
A. Furnish and install complete grouted system with applicable embedments, including appurtenant structural, mechanical, and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Plant testing of aggregate shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Aggregate Sieve Analysis ASTM C136 1 each trial batch City Contractor Amount
passing #200
sieve
ASTM C117 1 each trial batch City Contractor
Fine
Aggregate
Sand
Equivalent
ASTM D2419 As directed City Contractor
Organic
Impurities
ASTM C40 As directed City Contractor
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 519 of 2077 ends

1-22-dp 03 60 00 - Grouting - 2 of 10

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Soundness ASTM C88 As directed City Contractor
C. Plant testing of grout shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Grout Certification of
Mix Design
ACI 301 certified by independent
testing laboratory
1 per mix Contractor Contractor
Strength
Requirements
Applicable specified ASTM Standards
tested at 28 days
1 per product type Contractor Contractor
Grout
Materials
Materials
Inspection
Refer to Paragraph 2.2 below As directed City City

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ASTM C33 Concrete Aggregate.

2. ASTM C39 Compressive Strength of Cylindrical Concrete Specimens

3. ASTM C40 Organic Impurities in Sand for Concrete.

4. ASTM C88 Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate.

5. ASTM C109 Compressive Strength of Hydraulic Cement Mortars (Using 2” Cube Specimens)

6. ASTM C117 Materials Finer than No. 200 Sieve in Mineral Aggregates by Washing.

7. ASTM C136 Sieve or Screen Analysis of Fine and Course Aggregates.

8. ASTM C150 Portland Cement.

9. ASTM C494 Chemical Admixtures for Concrete.

10. ASTM C496 Splitting Tensile Strength of Cylindrical Concrete Specimens.

11. ASTM C531 Linear Shrinkage and Cioefficient of Thermal Expansion of Chemical-Resistant Mortars, Grouts, and Monolithic Surfacings and Polymer Concrete

12. ASTM C579 Compressive Strength of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes

13. ASTM C580 Flexural Strength and Modulus of Elasticity of Chemical-Resistant Mortars, Grouts, Monolithic Surfacings, and Polymer Concretes

14. ASTM C827 Change in Height at Early Ages of Cylindrical Specimens of Cementitious Mixtures

15. ASTM C939 Flow of Grout for Preplaced-Aggregate Concrete (Flow Cone Method)

16. ASTM 1090 Measuring Changes in Height of Cylindrical Specimens from Hydraulic-Cement Grout

17. ASTM C1107 Packaged Dry, Hydraulic-Cement Grout (Non-Shrink).

18. ASTM C1116 Fiber-Reinforced Concrete

19. ASTM D695 Compressive Properties of Rigid Plastics.

20. California Test No. 217 Sand Equivalent

21. California Building Code (CBC)

22. CRD-C 621 Corps of Engineers Specification for Non-Shrink Grout

23. International Concrete Repair Institute (ICRI) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Product Data required for bonding compounds, non-shrink grout, repair grout, topping grout, and water reducing retardant per Product Data requirements.

Installation Instructions Submit per Installation or Application instruction requirements for each type of manufactured grout.

SAMPLES
Material Samples Submit color samples for grout mortar on request. Mortar color shall match adjacent Work.

QUALITY ASSURANCE AND CONTROL SUBMITTALS
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 520 of 2077 ends

1-22-dp 03 60 00 - Grouting - 3 of 10

SUBMITTAL DESCRIPTION
Certificate of Compliance Submit mill test certification including fineness for each shipment of cement per ACI 301.

Submit aggregate gradation and certification per ACI 301.

Submit admixture certification including chloride ion content per ACI 301.

Submit Manufacturer’s certification grouts contain no chlorides or corrosive chemicals.

Submit Manufacturer’s certification non-shrink grout contains no aluminum, zinc, or magnesium powders as method of expansion.

Submit Manufacturer’s certification non-shrink grout does not rely on gas production or gypsum expansion.

Submit certification grout conforms to specified strength requirements Test Record Transcripts Submit for factory tests per Test Record Transcript requirements.

Delivery Tickets Submit as required for payment.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance Submit name and telephone number of grout Manufacturer's representative who will provide on-site service.

Representative shall have at least one year of experience with specified grouts.

B. Refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, Certificates of Compliance, and Test Record Transcripts.

C. When sources of aggregate are changed, submit new certification for new materials prior to its use.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of grout.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Bonding Agent
(Noncorrosive)
Concresive Div BASF Shakopee, MN (800) 433-9517
Edoco / Dayton Superior Kansas City, KS (877) 266-7732
Master Builders / BASF Beachwood, OH (800) 228-3318
Sika Corporation “Armatec 110 EpoCem” Lyndhurst, NJ (800) 933-7452 Accepted equal
Lubricant for Cement
Pressure Grouting
Intrusion Prepakt Intrusion Aid Nanaimo, BC (604) 618-2304 Sika Corporation Intraplast Lyndhurst, NJ (800) 933-7452 Accepted equal
Non-Shrink Epoxy Grout BASF Construction Chemicals “Masterflow 648” Beachwood, OH (800) 228-3318 Five Star Products “Five Star Epoxy Grout” Shelton, CT (800) 243-2206 L&M Construction Chemicals / Laticrete “Epogrout” Bethany, CT(800) 362-3331 Accepted equal
Non-Shrink Grout Class I BASF Construction Chemicals “Masterflow 713” Beachwood, OH (800) 228-3318 Euco Euclid Chemical Co “High Glow Grout” Cleveland, OH (800) 321-7628 Five Star Products “Five Star Grout” Shelton, CT (800) 243-2206 DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 521 of 2077 ends

1-22-dp 03 60 00 - Grouting - 4 of 10

ITEM MANUFACTURER MANUFACTURER LOCATION
Gifford-Hill American, Inc. Dallas, TX (214) 262-3600
Hilti “CG 200PC” Tulsa, OK (800) 879-8000
L&M Construction Chemicals / Laticrete “Duragrout” Bethany, CT(800) 362-3331 Master Builders / BASF. Embeco 636 Beachwood, OH (800) 228-3318 Master Builders / BASFMasterFlow 928 Beachwood, OH (800) 228-3318 Sika Corporation “Sikagrout 212” Lyndhurst, NJ (800) 933-7452 Tremcrete Systems, Incorporated Woodland, CA
Accepted equal
Non-Shrink Grout Class II BASF Construction Chemicals “Masterflow 928” Beachwood, OH (800) 228-3318 Five Star Products “Fluid Grout 100” Shelton, CT (800) 243-2206 L&M Construction Chemicals / Laticrete “Crystex” Bethany, CT(800) 362-3331 Accepted equal
Structural Repair Grout BASF Construction Chemicals “Emaco S88CI” Beachwood, OH (800) 228-3318 Five Star Products “Structural Concrete ES” Shelton, CT (800) 243-2206 Sika Corporation “Sikarepair 224” Lyndhurst, NJ (800) 933-7452 Accepted equal
Water Reducing Retarder Sika Corporation Plastocrete “161MR” Lyndhurst, NJ (800) 933-7452 Sika Corporation “Plastiment” Lyndhurst, NJ (800) 933-7452 Accepted equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Refer to Standard Specifications for Public Works Construction (Greenbook) §201-7 for materials requirements for non-masonry grout.

C. Provide the following grouts for the applications listed:

APPLICATION TYPE OF GROUT
Anchor bolts, anchor rods and reinforcing steel required to be set in grout in which average working or operating temperature >100°F or in high fire risk areas.

Non-Shrink - Class I
Storage tanks and non-motorized equipment and machinery <30 horsepower Non-Shrink - Class I Pumps ≤1000 horsepower, unless indicated otherwise Non-Shrink - Class I Filling block-out spaces for embedded items such as railing posts, gate guide frames, etc.

Non-Shrink - Class I (Class II
where placement time >20
min.)
Surface repairs Cement Grout
Repair of small (largest dimension <12”) holes and defects in concrete members which are not water bearing and not in contact with soil or other fill material Non-Shrink - Class I or NonShrink - Class II or Structural Repair Grout
Repair of small (largest dimension <12”) holes and defects in concrete members which are water bearing or in contact with soil or other fill materials Non-Shrink - Class II or
Structural Repair Grout
Repair of large (largest dimension >12”) holes and defects in concrete members. Structural Repair Grout Applications not listed above, where grout is indicated Non-Shrink Class I, unless specifically indicated otherwise
D. Materials for grout shall be:

ITEM MATERIAL SPECIFICATION
Cement Portland Cement Conform to ASTM C150 Type II/V Modified Low Alkali/Sulfate Resisting, including Table 2 optional requirements
Low Alkali containing ≤0.60% alkalis
Gradation ≥85% of cement by weight shall pass #325 screen.

Water Clean, Clear Potable
Water
TDS<1000 mg/l
Aggregate All Aggregate Conform to ASTM C33
Nonreactive clean hard durable washed material
From pits acceptable to City’s Representative
Ratio of silica released to reduction in alkalinity <1.0 Ratio of fine aggregate to total aggregate shall be <41% for hydraulic structures DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 522 of 2077 ends

1-22-dp 03 60 00 - Grouting - 5 of 10

ITEM MATERIAL SPECIFICATION
and <50% for all other structures.

Fine Aggregate Natural sand, manufactured sand or combination Sand Equivalent ≥75% average for 3 samples or ≥70% for any 1 sample.

Gradation – well graded per ASTM C33
100% passing #8 sieve
45% or more passing #40 sieve
3% max passing #200 sieve
Variation will be accepted if average of 3 consecutive tests falls within limits and variation does not exceed the following:

Sieves #30 or coarser: ≤2.0% variation
Sieves #50 or finer: ≤0.5% variation
Soundness ≤10% loss with sodium sulfate
Fineness modulus <3.00
Admixtures All Admixtures Compatible with grout
Conform to ASTM C494
Do not use admixtures containing calcium chloride
Use admixtures in accordance with Manufacturer’s recommendations Add admixtures separately to grout mix
Water Reducing
Retarder
Conform to ASTM C494 Type D
Bonding
Agent
Epoxy resin with anti-corrosive properties
Grout Dry-Pack Grout Proportions (parts by
volume)
1 part cement
2 parts fine aggregate Water reducing retarder
Sufficient water to make stiff workable mix.

Cement Grout f’c ≥4000 psi within 28 days
Proportions (parts by
volume)
1 part cement
2 / 3 parts fine aggregate Pressure grouting
admixture
Minimum amount of water to make stiff workable
mix.

Coloring Additive Blend white Portland cement with regular cement as needed to match adjacent concrete color
Quick-Setting Grout f’c ≥2500 psi within 24 hours
Set time ≤90 minutes at 70°F to initial set
Color Non-staining
Non-Shrink Epoxy
Grout
f’c ≥5000 psi at 24 hours
≥10,000 psi at 24 hours
Minimum Working Life ≥45 minutes at 75°F
Pourable. Non-shrink 100% solids system, pre-measured and pre-packaged Chemical formulation recommended by Manufacturer for application Non-Shrink Grout
Class I
f’c ≥ 6000 psi per ASTM C39 at 28 days
Tensile Splitting Strength ≥500 psi per ASTM C496 at 28 days Flexural Strength ≥500 psi per ASTM C580 at 28 days
Bond Strength (Concrete to
Grout)
≥1900 psi per ASTM C882 at 28 days
Early-Age Height Change ≤4.0% per ASTM C827
Shrinkage 0.0% per ASTM C827 and ASTM C1090
Expansion ≤0.3% per ASTM C1090
Slump Rejection Limit ≤4” on any test per ASTM C143
Conform to ASTM C1107 Grade B or C when mixed to fluid, flowable, and plastic consistencies.

Prepackaged, inorganic, fluid, non-staining, noncorrosive, non-gas-liberating, non-metallic, free-flowing, cement-based grout requiring only addition of potable water.

Grout, when tested, shall not bleed or segregate and maximum allowed water.

Do not use cement from kilns burning metal-rich hazardous waste fuel.

Grout shall be free of chlorides or corrosive additives.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 523 of 2077 ends

1-22-dp 03 60 00 - Grouting - 6 of 10

ITEM MATERIAL SPECIFICATION
Formulate grout for use at any consistency from fluid to plastic.

Manufacturer’s application instruction shall be printed on container, bag, or packaging.

Non-Shrink Grout
Class II
f’c ≥7500 psi per ASTM C39 at 28 days
Tensile Splitting Strength ≥500 psi per ASTM C496 at 28 days Flexural Strength ≥500 psi per ASTM C580 at 28 days
Bond Strength (Concrete to
Grout)
≥1900 psi per ASTM C882 at 28 days
Slump Rejection Limit ≤4” on any test per ASTM C143
Conform to ASTM C1107 Grade B or C when tested using amount of water needed to achieve fluid consistency per ASTM C939
Prepackaged, inorganic, fluid, non-staining, noncorrosive, non-gas-liberating, non-metallic, free-flowing, cement-based grout requiring only addition of potable water.

Grout, when tested, shall not bleed or segregate and maximum allowed water.

Do not use cement from kilns burning metal-rich hazardous waste fuel.

Grout shall be free of chlorides or corrosive additives.

Grout shall have extended working time of ≥30 minutes when mixed to fluid consistency as defined in ASTM C827 at temperature extremes of 45-90°F in accordance with ASTM C1107.

Formulate grout for use at any consistency from fluid to plastic.

Manufacturer’s application instruction shall be printed on container, bag, or packaging.

Structural Repair
Grout
f’c ≥6000 psi per ASTM C109 at 7 days
Bond Strength (Concrete to
Grout)
≥2000 psi at 1 day per ASTM C882
Slump Rejection Limit ≤4” on any test per ASTM C143
Extended-set pre-packaged cement-based mortar requiring only addition of potable water.

Grout shall be free of chlorides or lime other than that contained within hydraulic cement composition.

For repairs >2 ft3, structural repair grout may be extended by adding clean, damp, coarse aggregate per Manufacturer’s recommendations.

Curing
Materials
Refer to Section 03 39 00 and Manufacturer’s recommendations.

2.3 Mixes
A. Measure grouts as follows:

1. Measure cement grout accurately by volume using containers. a. Do not use shovel measurements.

2. For prepackaged grouts, measure ingredients by means recommended by Manufacturer.

B. Mix grouts as follows:

1. Mix grouts to consistency needed to fill grouted space for each application.

2. Mix grout for ≥1 minute.
a. Agitate diluted grout to keep ingredients mixed.

3. “Dry-pack” consistency shall mean plastic and moldable grout that will not flow.

4. Adjust slump for concrete/grout fill to match placement and finishing conditions but do not exceed specified maximum.

PART 3 - EXECUTION

3.1 Preparation
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 524 of 2077 ends

1-22-dp 03 60 00 - Grouting - 7 of 10
A. Make field measurements needed to install grout before ordering.

1. Make minor changes in dimensions as needed to avoid utilities or structural conflicts.

B. At least 10 Working Days before grouting, conduct pre-installation meeting to review requirements for surface preparation, mixing, placing, and curing for each proposed product.

1. Notify all parties involved with grouting including City’s Representative.

2. Provide services of field technician from grout Manufacturer to attend pre-installation meeting, observe initial installation of each grout type, and correct installation problems.

C. Prepare for grouting beneath equipment base plates as follows:

1. Size concrete equipment pads for equipment bases to be grouted so when equipment base is fully grouted, grout is stopped ≥1.0“ from pad edge.

2. Block out original concrete or finish concrete off sufficient distance below equipment mounting plates to provide ≥1” grout thickness or other thickness shown.

3. Complete mechanical, electrical, and finish work prior to placing topping or concrete/grout fill.

D. Prepare for non-shrink grouting to cement dowels and adhesive anchors in place as follows:

1. Install drilled anchors in concrete having age ≥21 days at time of anchor installation.

2. Identify position of reinforcing steel and other embedded items prior to drilling holes.

3. Unless otherwise shown, when non-shrink-grout anchors are used to resist tensile forces in structural applications, embedment depth shall equal or exceed development length (ld) determined in accordance with ACI 318 for cast in place reinforcing bars of same diameter and grade, unless it can be shown by calculation anchor spacing and edge distance is sufficient to develop tensile strength of anchor using lesser depth of embedment.
a. Submit calculations.

4. Exercise care in drilling to avoid damaging existing reinforcing or embedded items. a. Avoid damaging prestressing tendons, electrical and communications conduit, and piping.

5. Adjust locations of drilled holes to avoid damage to reinforcing bars or embedded items.

6. Relocation of drilled holes and adjustments or modifications to anchored or fastened items shall be considered part of Work and provided at no additional cost to City.

7. Notify City’s Representative if reinforcing steel or other embedded items are encountered during drilling.

8. Do not core drill holes, unless separately accepted.

9. Clean holes with water under pressure prior to grout and anchor installation.

10. Drill, brush, and clean holes in accordance with Manufacturer’s instructions.

E. Do not place grout until base concrete or masonry has attained its design strength.

F. Contact grout Manufacturer’s representative for assistance on hot- and cold-weather grouting techniques and precautions if applicable.

G. When cementitious grouts are used on concrete surfaces, saturate concrete surface with water for 24 hours prior to placement.

1. Upon completion of saturation period, remove excess water with clean, oil-free compressed air prior to grouting.

H. Surface preparation, curing, and protection of cement grout shall conform to Section 03 30

00. I. Holes required for grouting shall be blown clean.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 525 of 2077 ends

1-22-dp 03 60 00 - Grouting - 8 of 10

1. Drill horizontal holes for grouting at slight downward angle to facilitate holding grout until setting is complete.

2. Slightly bend bolts or reinforcing steel installed in horizontal grout holes accordingly.

J. Surfaces to contact with grout shall be free of dirt, loose rust, oil, wax, grease, curing compounds, laitance, loose concrete, and other deleterious materials.

K. Wash concrete surfaces clean and keep moist for ≥24 hours before placing non-shrink cementitious or cement grout.

1. Achieve saturation by covering concrete with saturated burlap bags, use of soaker hoses, or flooding.

2. Upon completion of 24-hour pre-soak, remove visible water from surface before grouting.

L. Shade Work from sunlight for at least 24 hours before and 48 hours after grouting.

M. Apply bonding agent to existing surfaces before applying grout or mortar.

3.2 Installation
A. Refer to 01 73 00 for basic execution and installation requirements.

B. Furnish and install grout at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. Applicable building code requirements

3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Install grout to tolerances recommended by Manufacturer.

1. Unless otherwise shown, install grout true and level using precision gauges and levels.

F. Install dry-pack grout as follows:

1. Use dry-pack grout for built-up surfaces, setting miscellaneous metal items and minor repairs.

2. Roughen surfaces required to be built up with dry-pack grout by brushing, cleaning, and coating with bonding agent specified in this section before applying grout.

3. Apply dry-pack grout immediately after applying bonding compound. a. Apply grout in bands or strips to form smooth covering of required thickness.

4. Slope construction joints in grout.
a. Clean and wet construction joints before resuming application.

5. Cure dry-pack grout in accordance with Section 03 30 00, G. Install cement grout as follows:

1. Cement grout may be used for filling nonbearing portions of equipment pads and pressure grouting.

2. Except for specialized equipment for pressure grouting, mixing and placing apparatus shall be similar to that used for cast-in-place concrete.

H. Install non-shrink grout as follows:

1. Use non-shrink grout for bearing surfaces of machinery and equipment bases, and bearing plates, and for setting bolts and reinforcing steel in holes for grouting.

2. Place non-shrink grout in accordance with grout Manufacturer's instructions.

3. Grout structural, equipment, tank, and piping support bases, unless otherwise shown.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 526 of 2077 ends

1-22-dp 03 60 00 - Grouting - 9 of 10

4. When anchor bolt or anchor rod diameter is ≤1”, hole diameter shall be ≥2”. a. When anchor bolt/rod diameter is >1”, hole diameter shall be ≥2x anchor bolt/rod diameter.

5. Place non-shrink grout in holes in non-sag (trowelable) consistency. a. Place grout in holes before anchor bolt/rod and then insert anchor bolt/rod and vibrate to ensure proper coverage.

6. Grout forms for grouting beneath equipment base plates shall be tight against retaining surfaces.
a. Seal joints liquid-tight as recommended by grout Manufacturer.

7. Coat forms as recommended by grout Manufacturer for easy form release.

8. After base plate is set in position at proper elevation by steel wedges or double nuts on anchor bolts, fill space between bottom of plate and original concrete pour with nonshrink-type grout through headbox of appropriate size.

9. For grouting beneath base plates, pour mixture of fluid consistency continuously into space between plate and base concrete.

10. Ensure grout space is filled.

11. Where this method of placement is not practical or where required by City’s Representative, submit alternate grouting methods for acceptance by City’s Representative.

I. Install pressure grout as follows:

1. Pressure grouting equipment shall include mixer and holdover agitator tanks and shall be designed to place grout at pressures up to 50 psi.
a. Provide gages to indicate pressure used.
b. Provide mixer with meter capable of indicating grout volume used to ±0.10 ft3 .

2. Prior to grouting, wash systems and holes to be grouted. a. Washing is not required for grouting soil voids outside pipe cylinders or casing pipes.

3. Complete grouting without stoppage once grouting commences. a. If equipment breaks down, wash out grouting system sufficiently to ensure fresh grout and adequate bond and penetration occur upon restarting grouting.

4. Maintain grout pressure until grout has set.

J. Refer to Section 03 39 00 for curing procedures.

K. Finish of grout surface shall match adjacent concrete unless otherwise shown.

3.3 Field Quality Control
A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Cement
Grout
Mix
Material
Properties
ASTM C1019 2 samples per day Contractor Contractor
Non-Shrink
Grout
Compressive
Strength
ASTM C1107 3 samples per batch (7-day
test) + 3 samples per batch
(28-day test) from first
placement of each grout type
and at intervals directed by
City’s Representative
Contractor Contractor
Construction
Tolerance
Refer to Section 03 30 00.

Installation &
Leakage
Visual inspection of finished
installation
1 inspection City City
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 527 of 2077 ends

1-22-dp 03 60 00 - Grouting - 10 of 10

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Field
Performance
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed
literature
1 test Contractor Contractor
11-month
Warranty
Inspection
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed
literature
1 test City Contractor
B. Provide services of factory-authorized representative on-site within 72 hours of request as part of Work to provide:

1. Installation technical assistance, inspection.

2. Field testing and adjustment.

3. Instruction of City’s personnel in operation and maintenance.

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 528 of 2077 ends

2-22-dp 05 05 19 – Post-Installed Concrete Anchors - 1 of 6 SECTION 05 05 19

POST-INSTALLED CONCRETE ANCHORS
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of post-installed concrete anchor bolts.

B. Refer to Section 05 05 23 for cast-in-place embedded anchor bolts and for structural steel connections, including bolting and welding.

C. Conform to Standard Specifications for Public Works Construction (Greenbook) §206, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 03 15 00: Concrete Accessories
J. Section 03 30 00: Cast-in-Place Concrete
K. Section 03 32 10: Cement Mortar
L. Section 03 60 00: Grouting
M. Section 05 05 23: Metal Fastenings and Welds
N. Section 05 50 00: Metal Fabrications
O. Section 05 52 00: Railings
P. Section 09 92 00: Galvanizing
Q. Section 33 05 38: Hangers and Supports

1.3 System Description
A. Furnish and install concrete anchors where shown including appurtenant mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Post-installed anchors shall be capable, under laboratory conditions described in ASTM E488, of sustaining the following loads:

SUBSTRATE LOAD RESISTANCE AT FAILURE
Concrete ≥4 x imposed load
Masonry ≥6 x imposed load
C. Shop quality control documentation shall be available in fabricator’s shop for City’s review.

1.5 References
A. Reference publications listed below and in various sections form part of specification to extent referenced. These are referred to within text by basic designation only.

1. AISC 316 Manual of Steel Construction ASD

2. AISC 317 Manual of Steel Construction Volume II Connections DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 529 of 2077 ends

2-22-dp 05 05 19 – Post-Installed Concrete Anchors - 2 of 6

3. AISC S326 Design Fabrication and Erection of Structural Steel for Buildings

4. ASME/ANSI B1.1 Unified Inch Screw Threads

5. ASME/ANSI B18.21.1 Washers:Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series)

6. ASTM A36 Carbon Structural Steel

7. ASTM A167 Stainless and Heat-Resisting Chromium Nickel Steel Plate, Sheet, and Strip

8. ASTM A193 Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service

9. ASTM A194 Carbon and Alloy Steel Nuts for High-Pressure and High-Temperature Service

10. ASTM A240 Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications

11. ASTM A307 Carbon Steel Bolts, Studs, and Threaded Rod 60 000 psi Tensile Strength

12. ASTM A780 Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

13. ASTM A1011 Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength

14. ASTM C881 Epoxy-Resin-Base Bonding Systems for Concrete

15. ASTM E10 Brinell Hardness of Metallic Materials

16. ASTM E488 Strength of Anchors in Concrete Elements

17. ASTM F436 Hardened Steel Washers

18. ASTM F593 Stainless Steel Bolts, Hex Cap Screws and Studs

19. ASTM F594 Stainless Steel Nuts

20. ASTM F1554 Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength

21. ASTM F3125 High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength

22. California Building Code (CBC)

23. MIL A907E Anti-seize Thread Compound, High-Temperature

24. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 206 “Miscellaneous Metal Items”

25. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 304 “Metal Fabrication and Construction”

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
MANUFACTURER’S LITERATURE
Product Data Submit for manufactured products per Product Data requirements.

Include ICC test reports verifying strength per ASTM E488and material equivalency for embedded anchors.

Include temperature at which load capacity reduces to 90% of that determined at 75°F.

Installation Instructions Submit per Installation Instructions requirements for embedded anchors.

SAMPLES
Material Samples Submit upon request

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of Compliance Submit coating system and application certification per Certificate of Compliance requirements.

Submit ICC-ES or IAPMO-UES report for epoxy anchor grouts for adhesive anchors.

Foundry or Test Record
Transcripts
Submit for factory tests upon request per Foundry or Test Record transcript requirements.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, Certificates of Compliance, Foundry or Test Records, and Material Samples.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of concrete anchor products.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 530 of 2077 ends

2-22-dp 05 05 19 – Post-Installed Concrete Anchors - 3 of 6 C. Store materials above ground on platforms, skids, or other supports and protect from rain, dirt, grease, foreign matter, and corrosion.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

EPOXY-BASED CONCRETE ANCHOR SYSTEMS, FASTENERS AND CONNECTIONS Concrete Anchors –
Capsule Epoxy
Adhesive Anchor
Systems
Hilti USA. “HVU” Tulsa, OK (800) 879-8000
ITW Ramset / Redhead “Epcon” Glendale Heights, IL (800) 348-3231 MKT Fastening LLC “Liquid Roc” Lonoke, AR (501) 676-2222 Powers Fasteners, Inc. “Powers Pure 110+” Brewster, NY (800) 524-3244 Simpson Strong Tie Co. “Epoxy-Tie” Riverside, CA (714) 871-8373 Accepted Equal
Concrete Anchors –
Injectable Epoxy
Adhesive Anchor
Systems
Hilti USA. “HIT” Tulsa, OK (800) 879-8000
Accepted Equal
Epoxy Grout for Anchor
Bolts
Five Star Products “DP Epoxy Grout” Shelton, CT (800) 243-2206 Hilti USA. “HIT” Tulsa, OK (800) 879-8000
Epoxy grout recommended by anchor Manufacturer
Accepted Equal

MECHANICAL CONCRETE ANCHOR SYSTEMS, FASTENERS AND CONNECTIONS Wall Anchors Powers Fasteners, Inc. Brewster, NY (800) 524-3244 Accepted Equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Provide adequately sized anchor bolts for equipment loads and in no case less than size recommended by equipment Manufacturer.

1. Provide embedded sleeve or epoxy-adhesive type anchors whenever possible.

2. Anchor bolt assembly shall consist of anchor bolt, surrounding pipe sleeve, bottom plate, leveling nut, nut and washer.

3. Assembly shall permit reasonable lateral movement of bolts to facilitate matching of bolts to equipment.

4. If stainless steel anchor bolts are not provided, galvanize anchor bolts and anchor bolt assemblies after fabrication.

5. Size anchors per Section 01 73 24 for seismic accelerations shown in Contract Documents.

C. Refer to Section 05 05 23 for structural bolting.

D. Materials for bolts, anchors and welds shall be:

ITEM MATERIAL SPECIFICATION

ANCHOR SYSTEMS
Concrete Anchors – Epoxy
Adhesive Anchor Systems
Embedded Stainless Steel
Threaded Rod “CRES”
(Use for corrosion
resistant applications,
Conform to one of the following:

ASTM A193 Grade B8M Class 1 SAE Type 316 bolts
(Fy=30ksi, Fu=75ksi, E=29000ksi)
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 531 of 2077 ends

2-22-dp 05 05 19 – Post-Installed Concrete Anchors - 4 of 6

ITEM MATERIAL SPECIFICATION
buried, or submersible
locations, fasteners for
equipment, fasteners for
aluminum, nickel silver,
and stainless steel, and in
chemical handling areas
or underground structures
ASTM A193 Grade B8M Class 2 SAE Type 316 bolts
(Fy≥50ksi, Fu≥90ksi, E=29000ksi)
ASTM F593 Condition AF Type 316 bolts with
(Fy≥20ksi, Fu≥65ksi, E=29000ksi)
ASTM F593 Condition A SAE Type 316 bolts
⅛”-¼” shall project through tightened nut.

Weldable
Stainless Steel Threaded
Nuts
Conform to one of the following:

ASTM A194 Grade 8M Class 1 SAE Type 316
(Fy=30ksi, Fu=75ksi, E=29000ksi)
ASTM A194 Grade 8M Class 2 SAE Type 316
(Fy≥50ksi, Fu≥90ksi, E=29000ksi)
ASTM F594 Condition AF SAE Type 316
(Fy≥20ksi, Fu≥65ksi, E=29000ksi)
ASTM F594 SAE Condition A Type 316
(Fy≥30ksi, Fu≥75ksi, E=29000ksi)
Free-cutting steel capable of developing full strength of bolts Stainless Steel Threaded
Washers
Conform to ASTM A240 and ANSI B18.21.1 Type A Plain
Anchor System Conform to ASTM C881 Type IV Grade 3, Classes A, B, and C with exception of gel time and epoxy content
Epoxy Adhesive 2- or 3-component non-shrink non-sag paste, Moisture insensitive when cured
Rated for cracked and uncracked concrete
Tested per ICC-ES AC308 and IBC requirements
Epoxy-Grout Aggregate As furnished prepackaged by epoxy grout Manufacturer Embedded Anchor Bolts
½”-4”
Refer to Section 05 05 23
PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to fabricate and install concrete anchors before submitting Shop Drawings or ordering.

1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Clean surfaces of metalwork to be in contact with concrete, removing rust, dirt, grease and other foreign substances before concrete is placed.

C. Embedded anchors shall be secured accurately in position when concrete is placed to prevent displacement or undue vibration during or after placement of concrete.

D. Concrete anchors not cast in place shall be installed in holes drilled or cored to dimensions shown in anchor Manufacturer’s installation instructions.

3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 24 for execution and installation requirements.

B. Furnish and install concrete anchors at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations.

2. California Building Code Chapter 19 “Concrete.”

3. California Building Code Chapter 22 “Steel.”

4. AISC 316 and 317 Manual of Steel Construction

5. AISC 360 Structural Steel Buildings
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 532 of 2077 ends

2-22-dp 05 05 19 – Post-Installed Concrete Anchors - 5 of 6

6. Other applicable building and fire code requirements.

7. Manufacturer’s installation and warranty requirements.

8. SSPWC Standard Specifications for Public Works Construction (Greenbook) §304 “Metal Fabrication and Construction.”
D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Drill and install epoxy adhesive anchor systems as follows:

1. Do not install drilled anchors until concrete has reached required 28-day compressive strength.

2. Drill holes perpendicular to exposed face of concrete and place within tolerances accepted within AISC documents.

3. Drill holes to permit embedments and spacings required my Manufacturer to develop full anchor strength and to conform with CBC Table 1911.2.

4. Roughen holes with clean and dry brush mounted on power drill.

5. Do not load adhesive anchors until adhesive has reached its indicated strength in accordance with Manufacturer's instructions.

F. Unless expressly shown otherwise or supported by Contractor-submitted and City-accepted shop drawings and engineering calculations, install bolts with embedments, edge distances and spacings per CBC Table 1911.2 including the following requirements:

BOLT DIAMETER MINIMUM EMBEDMENT MINIMUM EDGE

DISTANCE

MINIMUM SPACING
¼” 2½” 1½” 3”
⅜” 3” 2¼” 4½”
½” 4” 3” 6”
⅝” 4½” 3¾” 7½”
¾” 5” 4½” 9”
⅞” 6” 5¼” 10½”
1” 7” 6” 12”
1⅛” 8” 6¾” 13½”
1¼” 9” 7½” 15”
G. Conceal fastenings whenever possible.

3.3 Field Quality Control
A. Special inspection and field testing required by Chapter 17 of CBC (Table 1704.3 and 1704.4) shall be completed by an ICC-certified special inspector selected by City and shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Anchor Bolts Embedded Bolts in
Concrete and
Masonry
CBC Table 1704.4, CBC 1911.5 Continuous per
CBC Table
1704.3
Contractor Contractor
Edge Distances and
Spacings
Visual inspection and
measurement per CBC Table
1911.2
All bolts City City
Bolt Placement Error
Within Same Group
≤⅛” and fit within pre-drilled base All bolts City City Bolt Placement Error
Between Adjacent
Bolt Groups
≤¼” and fit within pre-drilled base All bolts City City Elevation of Anchor
Bolt Tops
±½” All bolts City City
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 533 of 2077 ends

2-22-dp 05 05 19 – Post-Installed Concrete Anchors - 6 of 6

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Bolt Variation from
Perpendicular to
Concrete Surface
0° (no tolerance) All bolts City City
11-month Warranty
Inspection
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed literature
All bolts City Contractor

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 534 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 1 of 18 SECTION 05 05 23

METAL FASTENINGS AND WELDS
PART 1 - GENERAL

1.1 Work Included
A. Basic requirements for metal fastenings and welds.

B. Refer to the following sections for Work not covered herein.

1. Section 05 05 19 for post-installed anchor bolts.

2. Section 33 05 31 for pipeline joint materials.

3. Section 33 05 38 for hangers and supports.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 63 00: Product Substitution Procedures
F. Section 01 65 00: Product Delivery Requirements
G. Section 01 66 00: Product Storage and Handling Requirements H. Section 01 73 00: Execution
I. Section 01 73 24: Seismic Restraint
J. Section 01 73 33: Mechanical Identification
K. Section 03 60 00: Grouting
L. Section 05 05 19: Post-Installed Concrete Anchors
M. Section 05 50 00: Metal Fabrications
N. Section 33 05 31: Pipeline Joint Materials
O. Section 33 05 38: Hangers and Supports

1.3 System Description
A. Use the following fasteners to fasten the metal materials shown:

METAL BEING FASTENED FASTENERS
Aluminum Stainless Steel “CRES”
Cast or Ductile Iron Stainless Steel “CRES”
Non-Structural Steel Low-Carbon Steel
Structural Steel High-Strength Alloy Galvanized Steel
Stainless Steel Stainless Steel “CRES”

1.4 Quality Assurance
A. Employ only competent workers on Work.

1. Employed persons found to be incompetent, intemperate, troublesome, disorderly, or otherwise objectionable or who fail to perform Work properly, acceptably and in accordance with Manufacturers’ installation and warranty requirements, shall be immediately removed from Work by Contractor and not reemployed on Work.

2. Welders shall be AWS certified for type of work they are performing.

B. Construction equipment requirements shall include:

CONSTRUCTION

EQUIPMENT
ITEM

FEATURE REQUIREMENTS
Welding General Of reputable make and maintained in such condition as to enable qualified welders, DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 535 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 2 of 18 Equipment welding operators, and tack welders to follow qualified welding procedures.

Provide consumable material including electrodes. Store and handle other welding consumables per Manufacturer’s recommendations.

SMAW
Electrodes
Use only low-hydrogen electrodes for SMAW
Handle, store, and condition SMAW electrodes as described in AWS D1.1 or applicable procedure
Filler Metals Choose filler metals to suit base metal and process used per above referenced standards
C. Structural steel welding in off-site fabrication shops shall be continuously inspected by governing jurisdiction’s Certified Special Inspector.

1. For fabrication performed in shop of licensed Fabricator accepted by governing Building Official and certified by ICC, only field welding and high-strength bolting of structural steel assemblies will be required to be performed under continuous inspection by ICCcertified Special Inspector.

2. City’s Representative reserves right to inspect fabricated material or steel at Fabricator’s shop to verify materials used conform to mill tests, affidavits of test reports, and that fabrication and welding procedures meet specifications.

3. Notify City’s Representative and supply City’s Representative with test reports ≥2 Working Days in advance of fabrication to allow shop inspection of steel to occur at City’s option.

4. If City’s Representative identifies faulty materials or workmanship in fabricated material at Fabricator’s shop, pay City’s reasonable costs for subsequent retests or inspections.

D. Unless otherwise indicated, nondestructive tests shall conform to applicable sections of ASTM Standards, Part 11, “Metallography; Nondestructive Tests.”

1. Unless otherwise noted, determine standard for nondestructive testing applicable to material and manufacturing method used.

2. Extent of examination and basis for acceptance shall be agreed upon between City’s Representative and Contractor.

3. Contractor’s Shop Drawings submitted for review shall define areas, extent, and type of nondestructive examination.

4. Weld inspection and acceptance criteria shall conform to AWS D1.1 and ASME Boiler and Pressure Vessel Code requirements.

5. Certify personnel performing and interpreting nondestructive examinations have been qualified as Level II or III examiners in accordance with ASNT SNT-TC-1A.

E. Factory testing of factory welds shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY

METAL FASTENINGS
Bolts Chemical and
Physical
Properties
Use applicable ASTM standards
(varies with steel)
Submit
Certificate of
Compliance
for each lot
Contractor Contractor
Fabricated
Steel
Inspection of
High-Strength
Bolted
Connections
ASTM F3125 At City’s
Discretion
during City
instigated
shop
inspection
City Contractor
WELDS
Fabricated Off-jobsite ICC-Certified Special Inspector Continuous Contractor Contractor DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 536 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 3 of 18

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Steel Welding Special
Inspection
selected by Building Official
Welding
Procedures
AWS D1.1 Continuous City Contractor

NONDESTRUCTIVE WELD TESTING
Weld
Examination
Before and
After StressRelieving
Welds Visual Inspection (VT) 100% of total
length
Contractor Contractor
Pressure
Vessels
PT, MT, UT and/or RT, as specified
above, unless otherwise accepted by
City’s Representative
100% of total
length
Contractor Contractor
Plate Edge
Preparation
Prior to
Pressure Vessel
or Thick Plate
Welding
Liquid penetrant (PT) 100% of total
length
Contractor Contractor
Fillet Welds
between Main
Components
Magnetic particle (MT) or liquid
penetrant (PT) examination
100% of total
length
Contractor Contractor
Fillet Welds
Including Welds
between
Stiffeners and
Main Beam
Members
Magnetic particle (MT) or liquid
penetrant (PT) examination
25% of total
length
selected at
random
Contractor Contractor
Partial
Penetration
Welds
Magnetic particle (MT), liquid
penetrant (PT), or ultrasonic (UT)
examination
25% of total
length
selected at
random
Contractor Contractor
Full-Penetration
Welds other
than Butt Welds
Ultrasonic (UT) examination followed
by radiographic examination (RT if
results are not clear, or by MT or PT if
RT is not feasible.
100% of total
length
Contractor Contractor
Butt Welds RT and PT or MT, or UT followed by
PT or MT and PT, if RT is not feasible
100% of total
length
Contractor Contractor
Back-Gouging
Full Penetration
or Butt Welds
PT or MT for pressure vessels.

As agreed upon between Contractor
and City for other mechanical
equipment
100% of total
length
Contractor Contractor
Equipment Welds VT, UT or RT Spot-check as
requested by
City
Contractor Contractor
F. At time of assembling, bolting, or welding, contacting steel surfaces shall be free of rust, loose mill scale, dirt, grease, or other material foreign to steel.

1. Do not apply paint to contact surfaces before bolting, or welding.

G. Holes for shop bolts shall be sub-punched or sub-drilled at fabricator’s option ¼” less in diameter than that of finished holes, and reamed to size with parts assembled with the following exceptions:

1. Do not punch holes in material >⅞” thick.

2. At fabricator’s option, holes in material >⅞” thick may be sub-drilled to diameter specified for sub-punching or may be drilled full size with parts assembled, provided parts are adequately bolted or clamped together.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 537 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 4 of 18

3. Holes in rolled beams and plate girders, including stiffeners and active fillers at bearing points may be sub-punched ⅛” less in diameter than that of finished holes, and reamed to size after assembly if material is not thicker than nominal diameter of bolt less ⅛”.

4. Holes in material ≤⅞” thick for bolts which do not transfer stress caused by external vertical loading may be punched full size or, at fabricator’s option, may be sub-punched ⅛” less in diameter than that of finished holes and reamed to size after assembly. a. This applies to holes for stitch bolts, lateral, longitudinal, or sway bracing and their connecting material, lacing, stay plates, diaphragms which do not transfer shear or stress, inactive fillers, and stiffeners at bearing points. b. However, holes through assembled material shall not pass through both reamed plies and plies punched full-size unless reamed holes have been sub-punched for fabricator’s convenience, or assembled material is >5 plies thick, of which main material consists of ≤3 plies.

H. Repair defective factory welds.

1. Defective factory welds found after stress-relieving may require additional stressrelieving after weld repairs and re-examination of welds, as agreed upon between Contractor and City’s Representative

1.5 References
A. Reference publications listed below and in various sections form part of specification to extent referenced. These are referred to within text by basic designation only.

1. AISC M011 Manual of Steel Construction for Shop and Field Welding

2. AISC 316 Manual of Steel Construction ASD

3. AISC 317 Manual of Steel Construction Volume II Connections

4. AISC S326 Design Fabrication and Erection of Structural Steel for Buildings

5. Aluminum Association Inc. Specifications for Aluminum Structures

6. ASME/ANSI B1.1 Unified Inch Screw Threads

7. ASME/ANSI B18.2.1 Square and Hex Bolts and Screws (Inch Series)

8. ASME/ANSI B18.2.2 Square and Hex Nuts (Inch Series)

9. ASME/ANSI B18.15 Forged Eyebolts

10. ASME/ANSI B18.21.1 Washers:Helical Spring-Lock, Tooth Lock, and Plain Washers (Inch Series)

11. ASME/ANSI B31.1 Power Piping

12. ASME Boiler and Pressure Vessel Code

13. ASNT SNT-TC-1A Recommended Practice

14. ASTM A193 Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service

15. ASTM A194 Carbon and Alloy-Steel Nuts for Bolts for High-Pressure or High-Temperature Service, or both.

16. ASTM A307 Carbon Steel Bolts and Studs, 60 000 psi Tensile Strength

17. ASTM A489 Carbon Steel Lifting Eyes

18. ASTM E165 Liquid Penetrant Examination for General Industry

19. ASTM E433 Reference Photographs for Liquid Penetrant Inspection

20. ASTM E709 Magnetic Particle Testing

21. ASTM F436 Hardened Steel Washers

22. ASTM F541 Alloy-Steel Eyebolts

23. ASTM F593 Stainless Steel Bolts, Hex Cap Screws and Studs

24. ASTM F594 Stainless Steel Nuts

25. ASTM F1554 Anchor Bolts, Steel, 36, 55, and 105-ksi Yield Strength

26. ASTM F3125 High-Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 AWS Welding Handbook

27. AWS QC1 Qualification and Certification of Welding Inspectors

28. AWS/ANSI A2.4 Standard Symbols for Welding, Brazing and Nondestructive Examination

29. AWS/ANSI A2.3 Standard Welding Terms and Definitions

30. AWS/ANSI A5.5 Low-Alloy Steel-Covered Arc-Welding Electrodes

31. AWS/ANSI S B3.0 Welding Procedures and Performance Qualifications

32. AWS/ANSI D1.1 Structural Welding Code – Steel

33. AWS/ANSI D1.2 Structural Welding Code – Aluminum

34. AWS/ANSI D1.3 Structural Welding Code – Sheet Steel DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 538 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 5 of 18

35. AWS/ANSI D1.4 Structural Welding Code – Reinforcing Steel

36. AWS/ANSI D1.6 Structural Welding Code – Stainless Steel

37. AWS/ANSI D1.7 Strengthening and Repairing Existing Structures

38. AWS/ANSI D1.8 Seismic Supplement

39. AWS/ANSI D1.9 Structural Welding Code – Titanium

40. AWS QC1 Qualification and Certification of Welding Inspectors

41. AWS/ANSI W1 Welding Metallurgy

42. California Administrative Code, Title 8, “Construction Safety Orders”

43. California Building Code (CBC)

44. MIL-E-18038 Welding Medium- and High-Tensile Steels

45. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 206 “Miscellaneous Metal Items”

46. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 304 “Metal Fabrication and Construction”

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

MOBILIZATION SUBMITTALS
Welder and Weld
Qualifications
Required for welders performing work on this project.

Submit welding operator qualification records.

Submit welding inspector qualifications.

Submit welding rod control procedures.

MANUFACTURER’S LITERATURE
Shop Drawings Submit for bolts ≥1” per structural Shop Drawing requirements Show welds on applicable Shop Drawings
Show weld type using AWS symbols.

Show weld procedure to be employed.

Show examination procedures to be applied.

Installation Instructions –
Welding Procedures
Submit destructive and nondestructive test results, and welding bead profiles.

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Welding Procedure
Specifications (WPS) and
Procedure Qualification
Records (PQR)
Submit written WPSs and PQRs for each welding procedure used unless requirement is waived by City’s Representative.

Welder Procedure
Qualification (WPQ)
Certificates
Prior to start of Work for factory or field fabrication, submit written WPQs using sample forms in AWS D1.1 or similar forms unless requirement is waived by City’s Representative.

Submit for welders performing Work on this project.

Also submit certifications of procedure qualifications for each welding procedure used.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of products.

C. Store low-hydrogen electrodes in accepted low-hydrogen oven at 300°F-400°F to control moisture in electrode coating.

1. Restore low-hydrogen electrodes not packaged in moisture-proof container by rebaking for ≥2 hours at 450°F-500°F in accepted oven.

2. After rebaking, store low-hydrogen electrodes in low-hydrogen oven at 300°F-400°F.

1.8 Project Site Conditions
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 539 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 6 of 18 A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

BOLTS AND NUTS
Bolts and Nuts A&G Engineering Company Anaheim, CA (714) 630-7400 Birmingham Fastener Supply (BF) Birmingham, AL (800) 695-3511 Copper State Bolt & Nut Phoenix, AZ (800) 603-6887
Industrial Threaded Products, Inc. (wholesaler) Brea, CA (800) 976-2658 Le Jeune Bolt Co. (L) Burnsville, MN (952) 890-4482
Nucor Fasteners (n) Saint Joe, IN (260) 337-1600
Ocean State Stainless, Inc. (wholesaler) Huntington Beach, CA (714) 898-0404 Pacific Coast Bolt (wholesaler) Santa Fe Springs, CA (562) 944-9549 Portland Bolt Co. (PB) Portland, OR (800) 547-6758
Robbins Mfg. Co., Inc.(R) Fall River, MA (508) 675-2555 ShurSeal Industries (wholesaler) Edmonton, AB (780) 435-3771 Silo Fastener, Inc. (S) Kansas City, MO (816) 231-6750
St Louis Screw & Bolt Co. (SL) Saint Louis, MO (314) 389-7500 Texas Bolt Company (TB) Houston, TX (713) 869-7111
Tripac Fasteners (wholesaler) Corona, CA (951) 280-4488 Unytite, Inc. (UNY) Peru, IL (815) 224-2221
Vegas Fastener Manufacturing (VFM) Las Vegas, NV (702) 651-9222 Vulcan Rivet & Bolt Corp (V) Birmingham, AL (205) 841-2711 Western Pacific Products (wholesaler) Chino, CA (909) 591-2410 Accepted Equal Phoenix, AZ (800) 603-6887
Anchor Bolts Portland Bolt & Manufacturing Company Portland, OR (800) 547-6758 Steel City Bolt Birmingham, AL (800) 522-2658
Accepted Equal
Studs Nelson Stud Welding Div. (N) Walnut, CA (909) 468-2105 Stud Welding Associates (+) Elyria, OH (440) 324-3042
Accepted Equal

EPOXY-BASED FASTENERS AND CONNECTORS
Metal-to-Metal Epoxy J-B Weld Company Sulfur Springs, TX (903) 885-7696 Accepted Equal

COATINGS
Anti-Seize Compound
for Stainless Steel Bolts
and Nuts
Anti-Seize Technology “Pure White” Franklin Park, IL (800) 991-1106 Bostik Never Seez Wauwatosa, WI (800) 726-7845
Dixon Ticonderoga Company “AS470” Lakehurst, NJ (732) 657-2255 Husk-Itt Husky Lube O-Seal Norco, CA (951) 340-4000
Loctite Dusseldorf, DEU (800) 624-7767
Permatex Hartford, CT (877) 376-2839
Ramco Specialty Products Anti-seize Huntington Beach, CA (800) 334-7071 Ramco Specialty Products TRX-Synlube Huntington Beach, CA (800) 334-7071 T Christy Enterprises, Inc. Anti-seize Anaheim, CA (714) 507-3300 Accepted Equal
Galvanized Touch Up
Material
Refer to Section 09 92 00

2.2 Materials
A. Where not otherwise shown, use the following list of material specifications, which are acceptable for intended purposes, as referenced, for selecting standard types and grades of materials used.

ITEM MATERIAL SPECIFICATION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 540 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 7 of 18

ITEM MATERIAL SPECIFICATION

FASTENERS, AND CONNECTIONS
Bolts and Nuts – HighStrength Alloy Galvanized
Steel (Use for connection
bolts and anchor bolts for
structural members
outside corrosive areas)
High-Strength Alloy
Carbon Steel –
Galvanized
Conform to one of the following:

ASTM F3125 Grade 120ksi
(Fy=92ksi, Fu=120ksi, E=29000ksi)
ASTM F3125 Grade 150ksi
(Fy=130ksi, Fu≥150ksi, E=29000ksi)
⅛”-¼” shall project through tightened nut.

Heavy hexagon series
Nuts Free-cutting steel capable of developing full strength of bolts Use self-locking nuts or lock-washers and plain nuts
Shape of nuts shall match bolt heads
Threads Conform to ANSI/ASME B18.2.1 for Bolts
Conform to ANSI/ASME B18.2.1 for Nuts
Coarse thread series
Use taps and dies so bolts retain normal clearance after hot-dip galvanizing
Galvanized Coating Refer to Section 09 92 00
Bolts and Nuts - Stainless
Steel “CRES” (Use for
corrosion resistant
applications, buried, or
submersible locations,
fasteners for equipment,
fasteners for aluminum,
nickel silver, and stainless
steel, and in chemical
handling areas or
underground structures
Stainless Steel –
Corrosion-Resistant
Conform to one of the following:

ASTM A193 Grade B8M Class 1 SAE Type 316 bolts with
ASTM A194 Grade 8M Class 1 SAE Type 316 nuts (Fy=30ksi, Fu=75ksi, E=29000ksi)
ASTM A193 Grade B8M Class 2 SAE Type 316 bolts with
ASTM A194 Grade 8M Class 2 SAE Type 316 nuts (Fy≥50ksi, Fu≥90ksi, E=29000ksi)
ASTM F593 Condition AF Type 316 bolts with
ASTM F594 SAE Type 316 nuts
(Fy≥20ksi, Fu≥65ksi, E=29000ksi)
ASTM F593 Condition A SAE Type 316 bolts with
ASTM F594 SAE Type 316 nuts
(Fy≥30ksi, Fu≥75ksi, E=29000ksi)
⅛”-¼” shall project through tightened nut.

Heavy hexagon series
Nuts Free-cutting steel capable of developing full strength of bolts Use self-locking nuts or lock-washers and plain nuts
Shape of nuts shall match bolt heads
Threads Conform to ANSI/ASME B18.2.1 for Bolts
Conform to ANSI/ASME B18.2.1 for Nuts
Coarse thread series
Threads may be either cut or cold-formed
Anti-Seize Lubricant Conform to MIL A907E
Bolts – Embedded
Eyebolts and Lifting
Eyebolts
Stainless Steel Conform to ASTM F541 SAE Type 316
Dimensions per ANSI/ASME B18.15
Welded eye type
Bolts – Naval Brass (Use
for corrosion resistant
applications and for
fastening bronze)
Naval Brass Conform to ASTM B21
Washers (Galvanized) Carbon Steel –
Galvanized
Square or rectangular smooth beveled washers, tapered in thickness
Hardened washers for high-strength bolts shall conform to AISC specification
Galvanized Coating Refer to Section 09 92 00
Washers (Stainless Steel) Stainless Steel SAE Type 316
Square or rectangular smooth beveled washers, tapered in thickness
Lock Washers Same Material as Nuts Provide where shown.

Screws Stainless Steel Do not use slotted-head screws.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 541 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 8 of 18

ITEM MATERIAL SPECIFICATION

WELDING ELECTRODES
Welding Electrode - Steel Steel Electrodes Conform to AWS D1.1 Conform to AWS A5.5
E70xx, except E7024 rods or electrodes shall not be used Low-Hydrogen
Electrodes
Conform to MIL-E-18038m (Ships)
Welding Electrode –
Stainless Steel
Stainless Steel
Electrodes
Type 347 electrode
Welding Electrode –
Aluminum
Aluminum Conform to AWS D1.2
Use type 4043 filler material

ANCHOR SYSTEMS
Embedded Anchor Bolts
½”-4” Stainless Steel
“CRES” (Use for corrosion
resistant applications,
buried, or submersible
locations, fasteners for
equipment, fasteners for
aluminum, nickel silver,
and stainless steel, and in
chemical handling areas
or underground structures
Stainless Steel
Threaded Rod
Conform to one of the following:

ASTM A193 Grade B8M Class 1 SAE Type 316 bolts (Fy=30ksi, Fu=75ksi, E=29000ksi)
ASTM A193 Grade B8M Class 2 SAE Type 316 bolts (Fy≥50ksi, Fu≥90ksi, E=29000ksi)
ASTM F593 Condition AF Type 316 bolts with
(Fy≥20ksi, Fu≥65ksi, E=29000ksi)
ASTM F593 Condition A SAE Type 316 bolts
⅛”-¼” shall project through tightened nut.

Weldable
Stainless Steel
Threaded Nuts
Conform to one of the following:

ASTM A194 Grade 8M Class 1 SAE Type 316
(Fy=30ksi, Fu=75ksi, E=29000ksi)
ASTM A194 Grade 8M Class 2 SAE Type 316
(Fy≥50ksi, Fu≥90ksi, E=29000ksi)
ASTM F594 Condition AF SAE Type 316
(Fy≥20ksi, Fu≥65ksi, E=29000ksi)
ASTM F594 SAE Condition A Type 316
(Fy≥30ksi, Fu≥75ksi, E=29000ksi)
Free-cutting steel capable of developing full strength of bolts Stainless Steel
Threaded Washers
Conform to ASTM A240 and ANSI B18.21.1 Type A Plain
Grout Refer to Section 03 60 00
Embedded Anchor Bolts –
High-Strength Alloy
Galvanized Steel (Use for
anchor bolts for structural
members outside
corrosive areas)
Galvanized HighStrength Alloy Carbon
Steel
Threaded Rod
Conform to one of the following:

ASTM F3125 Grade 120ksi
(Fy=92ksi, Fu=120ksi, E=29000ksi)
ASTM F3125 Grade 150ksi
(Fy=130ksi, Fu≥150ksi, E=29000ksi)
⅛”-¼” shall project through tightened nut.

Galvanized HighStrength Alloy
Threaded Nuts
Free-cutting steel capable of developing full strength of bolts Use self-locking nuts or lock-washers and plain nuts
Threads Coarse thread series
Use taps and dies so bolts retain normal clearance after hot-dip galvanizing
Galvanized Steel
Washers
Conform to ASTM F436 Type 1 and ANSI B18.21.1 Type A Plain Galvanized Coating Refer to Section 09 92 00
Grout Refer to Section 03 60 00
Post-Installed Concrete
Anchors
Refer to Section 05 05 19
B. Fasteners, bolts, nuts, screws, and threads, shall conform to US standards and the following.

1. Screw threads for screws, bolts, nuts, and other threaded hardware shall conform to ANSI B1.1.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 542 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 9 of 18

2. Connections, fasteners, and mountings required to install products shall conform to connections and mountings shown in Contract Documents and Submittals on locationspecific basis.

3. Unless otherwise shown, furnish and install Type 316 stainless steel nuts, bolts, and washers on bolted connections.

4. Nuts shall be symmetrically formed with hole centered and perpendicular to face. a. Tap nuts to fit corresponding thread on bolt such that nut can be run entire length of thread by fingers without forcing, and without play or rocking.

5. Liberally apply anti-seize thread lubricant to threaded portion of stainless steel bolts during assembly.

6. Do not assume acceptance of connections, fasteners, or mountings at 1 location constitutes acceptance of same at all locations.

7. Screws, bolts, and nuts shall be provided with locking devices.

8. Selection of locking means shall consider service conditions and the following:
a. On parts subject to vibration and on connections requiring repeated adjustment or which are not accessible (such as bolts or nuts inside hydraulic cylinders), provide positive reusable locking device on bolts, such as castellated nuts with cotter pins or soft copper lock plate or washer bent over nut and fixed point on structure. b. On other parts, use positive reusable locking devices or spring steel lock washers on bolts.
c. Use lock washers in combination with chemical thread-locking compound when required.
d. Chemical locking compound shall be manufactured for purpose of locking threaded connections, such as Loctite as manufactured by Loctite Corporation, or equal. e. Selection of chemical locking compound shall consider requirements for disassembly and maintenance.

C. Install anchor bolts, nuts, and washers as follows:

1. Anchor bolts, nuts, and washers, and plates shall be adequate for intended use.

2. Anchor bolts shall be either headed bolts, installed with or without pipe sleeves, or swage bolts installed in drilled holes as shown.

3. Install anchor bolts to facilitate true positioning of bearing assemblies.

4. Install anchor bolts perpendicular to concrete surfaces and place within tolerances accepted within AISC documents.

5. Furnish anchor bolts as part of each piece of equipment.

6. Anchor bolts shall be complete with required flat washers, lock washers, and nuts.

7. Refer to Section 01 73 24 for requirements for seismic design of anchor bolts.

8. Where anchor bolts are installed in pipe sleeves, fill pipes with grout at time grout pads are constructed or at time bearing assemblies or masonry plates are placed.

9. Grout to be placed in anchor bolt sleeves shall be Class E (1-part cement to 3-part sand) mortar.

10. Swage bolts installed in holes shall be either sulfured in or grouted in as shown.

D. Unless expressly shown otherwise or supported by Contractor-submitted and City-accepted Shop Drawings and Engineering Calculations, install bolts with embedments, edge distances and spacings per CBC Table 1911.2 including the following requirements:

BOLT DIAMETER MINIMUM EMBEDMENT MINIMUM EDGE

DISTANCE

MINIMUM SPACING
¼” 2½” 1½” 3”
⅜” 3” 2¼” 4½”
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 543 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 10 of 18

BOLT DIAMETER MINIMUM EMBEDMENT MINIMUM EDGE

DISTANCE

MINIMUM SPACING
½” 4” 3” 6”
⅝” 4½” 3¾” 7½”
¾” 5” 4½” 9”
⅞” 6” 5¼” 10½”
1” 7” 6” 12”
1⅛” 8” 6¾” 13½”
1¼” 9” 7½” 15”
E. Welding, welded steel joints and structures fabricated by welding shall conform to the following.

1. Selection of welding processes and development of weld procedures is part of design process established by Contractor and shall consider stress levels and use of each component.
a. Use materials and methods minimizing distortion and developing strength and corrosion resistance of base metals.
b. Fuse metal at welded joints without undercut or overlap.

2. Ensure weld joints are designed and sized in accordance with current engineering standards and practices for each class of equipment.

3. Design, produce, qualify, inspect, and repair structural and non-structural steel welds in accordance with AWS D1.1.

4. Design, produce, qualify, inspect, and repair pipe and pipe related welds in accordance with ASME B31.1.

5. Design, produce, qualify, inspect, and repair welds for pressure vessels or pressure containing parts to accepted welding rules of ASME §VIII and §IX.

6. Remove welding flux immediately.

7. Welded components and assemblies, to be machined, shall be stress-relieved prior to final machining.
a. Perform stress-relief in accordance with AWS D1.1 and applicable welding specifications referenced above.

8. Welds shall be continuous, unless otherwise noted or approved. a. Welds shall be even, with no contact gaps, or crevices left between members or unfilled re-entrant corners that would harbor moisture or dirt and prevent satisfactory application and retention of corrosion protective system. b. At exposed connections, finish, smooth, and blend exposed welds and surfaces so no roughness shows after finishing and contour of welded surface matches that of adjacent surface.

9. Ensure suppliers and subcontractors comply with these requirements as they apply to manufactured equipment.

F. Welding, welded aluminum joints and structures fabricated by welding shall conform to the following.

1. Select welding processes and develop weld procedures as part of design process established by Contractor.
a. Consider stress levels and use of each component.

2. Ensure weld joints are designed and sized in accordance with current engineering standards and practices for each class of equipment.

3. Design, produce, qualify, inspect, and repair structural and non-structural steel welds in accordance with AWS D1.2.

4. Welds shall be continuous, unless otherwise noted or approved.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 544 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 11 of 18 a. Welds shall be even, with no contact gaps, or crevices left between members or unfilled re-entrant corners that would harbor moisture or dirt and prevent satisfactory application and retention of corrosion protective system.

5. Ensure suppliers and subcontractors comply with these requirements as they apply to manufactured equipment.

G. Welding, welded stainless steel joints and structures fabricated by welding shall conform to the following.

1. Select welding processes and develop weld procedures as part of design process established by Contractor.
a. Consider stress levels and use of each component.

2. Ensure weld joints are designed and sized in accordance with current engineering standards and practices for each class of equipment.

3. Design, produce, qualify, inspect, and repair structural and non-structural steel welds in accordance with AWS D1.6.

4. Welds shall be continuous, unless otherwise noted or approved. a. Welds shall be even, with no contact gaps, or crevices left between members or unfilled re-entrant corners that would harbor moisture or dirt and prevent satisfactory application and retention of corrosion protective system.

5. Ensure suppliers and subcontractors comply with these requirements as they apply to manufactured equipment.

H. Welding procedures shall be as follows.

1. Perform welding by electric-arc method, by process at least equal to that required by Standard Qualification Procedure of American Welding Society.

2. Welding Procedure Specifications (WPSs) for welds shall be qualified per applicable Codes.

3. WPS submittals shall be accepted by City’s Representative prior to use for fabrication.

4. Ensure accepted WPSs are in presence of welding personnel prior to production welding.

5. Ensure contents of WPS are being followed.

6. Acceptance and repair of mill-induced discontinuities shall be handled as described in applicable AWS or ASME code sections.

7. Arc strikes and temporary welds in critical locations shall be completely removed, inspected and repaired per AWS D1.1 or applicable procedure.

8. Welding shall only be done on materials above 50°F on dry surfaces.

9. Short-circuiting arc GMAW is prohibited.

10. Electroslag and electrogas welding is prohibited.

I. Qualification of welders shall be as follows.

1. Welding Performance Qualification (WPQs) records for welding personnel shall conform to AWS D1.1 or applicable procedure.

2. Welding operators shall submit documentary evidence of having been qualified by tests as prescribed by AWS D1.1 §5 and AWS W1 §7, to perform type of welding indicated.

3. Test welders and welding operators in accordance with these Codes.

4. Welders and welding operators shall have in their possession, valid qualification records for welding positions and welding processes used.

5. Maintain welder qualification test records and keep current for duration of Work.

6. When cause exists to question a welder’s ability to make welds in accordance with these requirements, City may request welder in question be retested.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 545 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 12 of 18

7. Retrain or replace welders who cannot maintain quality level as specified to satisfaction of City’s Representative.

8. Furnish proof welding operators and welders possess requisite qualifications. a. Allow City’s Representative to witness shop radiography. b. Free access shall be allowed to radiographic film records. c. Furnish necessary copies of test reports, together with copies of supplier’s test reports on welding rod.

J. Dissimilar metals, when used in conjunction with each other shall have insulation provided between adjoining surfaces to eliminate direct contact and resultant current.

1. Materials of construction shall be cathodically compatible to preclude galvanic action.

2. Where dissimilar metals may contact, provide insulation between adjoining surfaces to eliminate direct contact and galvanic action.

3. Electrolytic insulation shall be bituminous impregnated felt, heavy bituminous coatings, nonmetallic separators, bushings, washers, or other accepted materials.

K. For purposes of chemical compatibility, use the following materials for bolts unless otherwise recommended by Manufacturer and accepted by City:

ENVIRONMENTAL OR CHEMICAL EXPOSURE STRENGTH ACCEPTABLE BOLTING METALS

INORGANIC CHEMICALS
Ammonium Sulfate (NH4)2SO4 316SS
Sodium Hypochlorite (NaClO) 15% 316SS
Titanium

ENVIRONMENTS
Recycled Water n/a 316SS
Wastewater n/a 316SS
PART 3 - EXECUTION

3.1 Preparation
A. Holes for bolts shall be full size, punched and reamed, or drilled.

1. Measure bolt locations in field before drilling companion holes in structural steel beam or assembly.

2. Finished hole shall be 1/16” larger than nominal bolt diameter.

3. Holes punched full size shall have burrs and sharp edges removed.

4. Diameter of die shall not exceed diameter of punch by > 3/32” B. Holes for field bolts shall be sub-punched or sub-drilled at fabricator’s option, ¼” less in diameter than that of finished holes and shall be reamed to size through steel templates with hardened steel bushings, with the following exceptions:

1. Holes required to be sub-drilled and reamed may be sub-drilled ⅛” less in diameter than finished hole provided offset of any hole in any ply measured from outer ply after hole is finished ≤ 1/32”, and ≤ 20% of holes provide 1/32” offset.

2. Field splices in plate girders and in truss chords shall be reamed with members assembled.
a. Other field connections may be reamed with members assembled at fabricator’s option.
b. Chord splices in truss members shall, in all cases, be reamed or drilled with at least 3 abutting sections assembled and with milled ends of compression chords in full bearing.

3. Assemblies such as floor systems to girders, complete trusses, rolled beam spans connected by diaphragms, and portals to trusses shall be reamed with members assembled if so shown.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 546 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 13 of 18

4. Field connections of lateral, longitudinal, or sway bracing shall conform to requirements of holes for shop bolts.

5. Holes in material thicker than ⅞” shall not be punched, but shall be sub-drilled to diameter specified for sub-punching, or drilled full size with parts assembled.

C. Accuracy of punching shall be such that for any group of holes when assembled, 75% shall admit rod equal to diameter of bolt at right angles to plane of connection.

1. Otherwise holes shall be reamed.

2. When extent of reaming is such that holes cannot be properly filled or accurately adjusted after reaming, faulty member shall be discarded and replaced.

3. Do not correct mis-punched members without acceptance by City’s Representative.

D. Reaming shall be done after pieces forming member are assembled and bolted together so surfaces are in contact.

1. Remove burrs and sharp edges of reamed hole under or bolt and nut using countersinking tool making 1/16” fillets.

2. Take pieces apart before bolting, if necessary and remove shavings.

3. If it is necessary to disassemble members for shipping or handling, pieces reamed together shall be so marked that they may be reassembled in same position.

4. Do not interchange reamed parts.

E. Drilled holes shall be 1/16” larger than nominal diameter of bolt.

1. Remove burrs and sharp edges of reamed hole under or bolt and nut using countersinking tool making 1/16” fillets.

2. Remove burrs on outside edges.

3. If members are drilled while assembled, secure parts together during drilling.

4. Drill drilled holes to finish size while all thicknesses of metal are assembled, or subdrilled and reamed as required for punched and reamed holes.

5. Holes shall be clean-cut, without torn or ragged edges.

6. Holes that must be enlarged to admit bolts shall be reamed.

7. Drilling shall be done accurately.

F. Prepare surfaces for welding as follows

1. Cut members and sections to be joined by welding accurately to size, with edges sheared, flame-cut or machined to suit required type of welding and to allow full penetration.

2. Surfaces of members or sections to be welded shall be free from rust, grease, and other foreign matters for at least 2” back from weld edge.

3. Accurately cut plates to be joined by welding to size.

4. Roll by pressure to proper curvature, which shall be continuous from edge.

5. Do not flatten curvature along edges with correction by blows.

6. Dimensions and shape of edges to be joined shall allow thorough fusion and penetration.

7. Plate edges shall be properly formed to accommodate welding conditions.

8. If tack welds are used in weld groove, remove each tack before welding operation.

9. Accurately align butt joints and retain in position during welding operations so at finished joint projection of 1 plate beyond its adjoining plate is ≤1/16”.

10. Throat gap for butt joints shall be ≤⅛”.

11. Where possible, design joints so welding may be done in down-hand, vertical or horizontal position.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 547 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 14 of 18

12. Backing plates or other reinforcement on both faces of weld on butt joints shall be chipped and ground flush with surrounding plate.

13. When welding plates, of which one or both >1” thickness, preheat contiguous areas of plates around welding operation to ≥300°F to prevent distortion of weld cracking. a. Keep at uniform temperature throughout process.
b. Preheating to temperature 400°F is not required.

14. Measure temperature using Tempilstiks or other accepted means.

15. Use low hydrogen electrodes where necessary.

16. Edges of surfaces (up to thickness of metal) to be welded shall be sound metal free of visible defects, such as laminations or defects caused by cutting operations, and free from rust, oil, grease, and other foreign matter.

17. Supply welding rods in sufficient quantities to complete welding requirements of materials supplied under this Contract plus 25% surplus. a. Welding electrodes shall conform to AWS Filler Metal Specification A5 or ASME Boiler and Pressure Vessel Code, §II, Part C.
b. Supply welding machines and welding equipment required for erection at Site. c. Provide suitable meters to show welding current and arc voltage. d. Welding rods shall be plastic-wrapped against moisture and shipped in hermetically sealed metal containers.
e. Do not use welding rods, which absorb moisture in coating.

3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 24 for basic execution and installation requirements.

B. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 22 “Steel”

3. Other applicable building code requirements

4. Manufacturer’s installation and warranty requirements

5. AWS B3.0 Welding Procedures and Performance Qualifications

6. AWS D1.1 Structural Welding Code – Steel

7. AWS D1.2 Structural Welding Code – Aluminum

8. AWS D1.3 Structural Welding Code - Sheet Steel

9. AWS D1.4 Structural Welding Code – Reinforcing Steel

10. AWS D1.6 Structural Welding Code – Stainless Steel

11. AISC 316 and 317 Manual of Steel Construction

12. AISC 360 Structural Steel Buildings

13. AISC M011 Manual of Steel Construction for Shop and Field Welding

14. AISC S326 Design Fabrication and Erection of Structural Steel for Buildings

15. Standard Specifications for Public Works Construction (Greenbook) §304-1 “Structural Steel”

16. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 304 “Metal Fabrication and Construction”
C. Refer variances between above documents and Contract Documents to City’s Representative.

D. Protect dissimilar metals from galvanic corrosion using pressure tapes, coatings, or isolators.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 548 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 15 of 18 E. Provide mounts, guides, bearing plates, flanges, anchor and attachment bolts and screws, saddles, supports, pads and skids necessary to securely mount products and equipment.

1. Tighten bolts to Manufacturers' specifications using torque wrenches.

2. Unless otherwise directed, use lubricant such as Copperkote or blue Teflon when making up bolts.

F. Perform bolting as follows:

1. Bolts shall be unfinished bolts, or high-strength steel bolts as shown.

2. Unfinished bolts in shear shall have no more than 1 thread within grip.

3. Bolts shall extend entirely through nut but not more than specified distance beyond outside face of nut.

4. Unfinished structural bolts in tension shall have 2 nuts.

5. Diameter of unfinished bolts shall be ≤ 1/32” smaller than hole diameter.

6. Bolted connections using high-strength steel bolts shall conform to ASTM A3125.

7. Bolts shall not be permitted to drift

8. Holes shall not be enlarged to correct misalignment.

9. If mismatching of holes occurs, provide new materials.

10. Drive bolts accurately into holes without damaging thread.

11. Protect boltheads from damage during driving, and replace if damaged.

12. Boltheads and nuts shall rest squarely against metal.

13. Draw boltheads and nuts tight against work using suitable wrench ≥15” long or torque wrench set to provide similar torque.

14. Tap bolt heads with hammer while nut is being tightened.

15. After being tightened, nuts shall be locked.

16. Bolts used on beveled surfaces having slopes >1:20 with plane normal to bolt axis hall be provided with beveled washers to provide full bearing of boltheads and nuts.

17. Where self-locking nuts are not furnished, bolt threads shall be upset to prevent nuts from backing off.

G. Perform welding as follows:

1. Welding and weld reinforcement shall conform to AWS D1.1 and AWS D1.3,

2. Welders, welding operators, and tackers shall be qualified in accordance with applicable AWS standards.

3. Welded components subject to vibration and fatigue shall be fabricated with fully penetrated welds.

4. Use metal-arc, submerged arc or gas-shield arc process as described in AWS “Welding Handbook” as supplemented by other pertinent AWS standards.

5. Weld sizes between members shall not be less than those specified in AWS D1.1, Structural Welding Code, or ASME §VIII, Division I.

6. In assembly and during welding, clamp, support, and restrain component parts to control dimensions and minimize distortion.

7. Use electrodes intended for grade of steel or metal being joined. a. Use materials and methods that minimize distortion and preserve strength and corrosion resistance of base metals.

8. Obtain fusion without undercut or overlap.

9. Remove welding flux immediately.

10. Provide 2 passes for metal 3/16” thick plus one additional pass for each additional ⅛” in metal thickness.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 549 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 16 of 18 a. Fillet welds shall be ≥¼”;
b. Make fillet welds ≥ 5/16” shall be with 2 or more passes. c. Make fillet welds with full throat, and with each leg of uniform length of indicated size in accordance with Contract Documents and Shop Drawings

11. Butt welds shall be fully penetrated and slightly convex of uniform height. a. In plates >5/16” thick use double-welded type joints.

12. Peening of multiple pass welds to control distortion or to minimize residual stresses may be carried out with light blows from power hammer, using elongated round-nosed tool. a. Peen immediately after depositing and cleaning.
b. Exercise care to prevent scaling, flaking or rupturing of weld and base metal from overpeening.
c. Neither first nor last pass of multiple weld shall be peened.

13. Welds shall be uniform in width and size throughout their length with each layer of weld smooth, free of slag, cracks, pinholes and undercutting, and completely fused to adjacent base metal and weld beads.
a. Avoid coarse ripples, irregular surfaces, non-uniform bead patterns, high crowns, deep ridges or valleys between beads.

14. At exposed connections, finish exposed welds so surfaces are smooth and blended.

15. Stainless-type weld, for protection against pitting or corrosion, shall be of chromium nickel steel.
a. Type, chemical composition and ASTM class of welding rods used for this purpose shall meet with acceptance from City’s Representative.

16. Upon completing weld, remove temporary bracing and attachments. a. Exercise care that base metal to which bracing is attached is not adversely affected. b. Chip projecting welds remaining after this operation and grind flush. c. Weld tears in base metal and grind flush.
d. If temporary bracing or attachments are welded to plates <1” thick, preheat requirements may be waived; however, upon removing these attachments, base metal shall be ground flush and inspected for cracks.

17. Test plates for automatic welding on longitudinal seams shall be attached to sections to be welded if requested by City’s Representative.

B. Finish welding as follows

1. Remove weld splatter, flux, slag and burrs.

2. Grind sharp corners of material to be painted or coated to at least 1/32” on the flat.

3. Dress welds to display good appearance and provide surface suitable for painting.

4. Grind and blend structural welds to avoid stress raisers.

5. Dress welds requiring nondestructive examinations by chipping and grinding as required for good interpretation by selected weld examination methods.

6. Erection bolts required for welded splices or connections may be left in place. a. Burn off ends of erection bolts which project beyond nut flush with face of nut. b. Where bold does not project, tack weld end of bolt and nut to prevent loosening of nut.
c. Complete burning off of bolt ends or tack welding before painting.

C. Repair welding as follows

1. Repair welds to produce workmanlike appearance, with uniform weld contours and dimensions.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 550 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 17 of 18

2. Unacceptable defects in welds shall be chipped out to sound metal and such areas shall be checked by Contractor as directed by City’s Representative to ensure defect has been completely removed before repair welding.

3.3 Field Quality Control
A. Special inspection and field testing required by Chapter 17 of CBC (Table 1704.3 and 1704.4) shall be completed by an ICC-certified special inspector selected by City and shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Metal
Fastenings
and Welds
Welding
Materials
AISC §A3.5 and CBC §1708.4 Periodic per CBC
Table 1704.3
Contractor Contractor
Weld
Procedure
Qualification
AWS QC1 One each
procedure in
presence of City’s
Representative
Welding AISC 341, AWS D1.1, D1.3, CBC
1704.3.1, and CBC Table 1704.3.

Also inspect for proper dimensions and
absence of cracks, undercutting,
surface holes or slag inclusions
Periodic per CBC
Table 1704.3 for
single-pass fillet
welds 5/16” or
smaller or floor
and roof deck
welding
AISC 341, AWS D1.1 CBC 1704.3.1,
and CBC Table 1704.3
Continuous per
CBC Table
1704.3 for all
other welds
Nondestructive
Weld Testing
Magnetic particle testing (MT), dye
penetrant (PT), radiography (RT) or
ultrasonic (UT)
1 inspection each
weld
Welding Gas
Pockets, Slag,
and Oxide
Inclusions
No defects >1/16” in any dimension
Sum of all defects in any square inch
shall be ≤⅜”
Periodic
Brinnell
Hardness
≥ (Parent metal minimum specified
tensile strength in psi) / 500
≤ (Parent metal minimum specified
tensile strength in psi +50 psi )/500
Periodic
Joint Details CBC 1704.3.2 Periodic per CBC
Table 1704.3
High-Strength
Bolting
AISC 360 §M2.5 and CBC 1704.3.3 Periodic per CBC
Table 1704.3
Continuous for
slip-critical bolting
per CBC Table
1704.3
11-month
Warranty
Inspection
Confirm Work conforms to Contract
Documents and Manufacturer’s printed
literature
1 test each
equipment item
City Contractor
Anchor
Bolts
Installation Refer to Section 05 05 19 All bolts City Contractor B. Unless otherwise indicated, nondestructive tests shall conform to applicable sections of ASTM Standards, Part 11, “Metallography; Nondestructive Tests.”

1. Unless otherwise noted, determine standard for nondestructive testing applicable to material and manufacturing method used.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 551 of 2077 ends

2-22-dp 05 05 23 – Metal Fastenings and Welds - 18 of 18

2. Extent of examination and basis for acceptance shall be agreed upon between City’s Representative and Contractor.

3. Contractor’s Shop Drawings submitted for review shall define areas, extent, and type of nondestructive examination.

4. Weld inspection and acceptance criteria shall conform to AWS D1.1 and ASME Boiler and Pressure Vessel Code requirements.

5. Certify personnel performing and interpreting nondestructive examinations have been qualified as Level II or III examiners in accordance with ASNT SNT-TC-1A.

C. Prior to Special Inspection of steel welding, verify seam welds and puddle welds are made in accordance with Contract Documents.

1. Inspection shall ensure proper electrodes, current, travel and speed are used and that no cracks, serious undercutting, overlap, surface holes, or slag inclusions occur.

D. Provide copies of special inspection reports to City’s Representative and applicable Building Official.

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 552 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 1 of 8
SECTION 05 50 00

METAL FABRICATIONS
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of metal fabrications, including formed metal fabrications.

B. Refer to the following sections for Work not covered herein.

1. Section 05 05 19 for post-installed concrete and masonry anchors

2. Section 05 05 23 for structural steel connections, including bolting and welding.

3. Section 05 14 00 for structural aluminum framing.

4. Section 05 51 00 for stairs, ladders, and platforms.

5. Section 05 52 00 for railings.

6. Section 05 53 00 for gratings and floor plates.

7. Section 09 92 00 for galvanizing.

8. Section 33 05 31 for piping joint materials and bolting C. Conform to Standard Specifications for Public Works Construction (Greenbook) §206, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 01 73 24: Seismic Restraint
I. Section 03 15 00: Concrete Accessories
J. Section 03 30 00: Cast-in-Place Concrete
K. Section 03 32 10: Cement Mortar
L. Section 03 60 00: Grouting
M. Section 05 05 19: Post-Installed Concrete Anchors
N. Section 05 05 23: Metal Fastenings and Welds
O. Section 05 14 00: Structural Aluminum Framing
P. Section 05 51 00: Stairs, Ladders, and Platforms
Q. Section 05 52 00: Railings
R. Section 05 53 00: Gratings and Floor Plates
S. Section 09 90 00: Painting and Coating
T. Section 09 92 00: Galvanizing
U. Section 33 05 31: Piping Joint Materials
V. Section 33 05 38: Hangers and Supports

1.3 System Description
A. Furnish and install metal fabrications where shown including appurtenant mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 553 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 2 of 8

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Form metal fabrications true to detail with clean, straight, sharply defined profiles and smooth surfaces of uniform color and texture, free from defects impairing strength or durability.

C. Shop quality control documentation shall be available in fabricator’s shop for City’s review.

1.5 References
A. Reference publications listed below and in various sections form part of specification to extent referenced. These are referred to within text by basic designation only.

1. AISC 316 Manual of Steel Construction ASD

2. AISC 317 Manual of Steel Construction Volume II Connections

3. ASME/ANSI B1.1 Unified Inch Screw Threads

4. ANSI/ASME B18.15 Forged Eyebolts

5. ANSI AWS A2.4 Standard Symbols for Welding, Brazing and Nondestructive Examination

6. API 9A Wire Rope

7. ASSE 1060 Outdoor Enclosures for Backflow Prevention Devices

8. ASTM A36 Carbon Structural Steel

9. ASTM A167 Stainless and Heat-Resisting Chromium Nickel Steel Plate, Sheet, and Strip

10. ASTM A193 Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service

11. ASTM A194 Carbon and Alloy Steel Nuts for High-Pressure and High-Temperature Service

12. ASTM A240 Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and Strip for Pressure Vessels and for General Applications

13. ASTM A276 Stainless Steel Bars and Shapes

14. ASTM A283 Low and Intermediate Tensile Strength Carbon Steel Plates

15. ASTM A307 Carbon Steel Bolts, Studs, and Threaded Rod 60 000 psi Tensile Strength

16. ASTM A413 Carbon Steel Chain

17. ASTM A489 Carbon Steel Lifting Eyes

18. ASTM A786 Hot-Rolled Carbon, Low Alloy, High-Strength Low Alloy, and Alloy Steel Floor Plates

19. ASTM A1008 Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low Alloy, High-Strength Low Alloy with Improved Formability, Required Hardness, Solution Hardened, and Bake Hardenable

20. ASTM B26 Aluminum Alloy Sand Castings

21. ASTM B455 Copper-Zinc-Lead Alloy (Leaded-Brass) Extruded Shapes

22. ASTM B584 Copper Alloy Sand Castings

23. ASTM C881 Epoxy-Resin-Base Bonding Systems for Concrete

24. ASTM E10 Brinell Hardness of Metallic Materials

25. ASTM F541 Alloy Steel Eyebolts

26. ASTM F593 Stainless Steel Bolts, Hex Cap Screws and Studs

27. ASTM F594 Stainless Steel Nuts

28. ASTM F3125 High Strength Structural Bolts, Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa) Minimum Tensile Strength

29. ASTM F1267 Metal, Expanded, Steel

30. AWS Welding Handbook

31. AWS A5.5 Low-Alloy Steel-Covered Arc-Welding Electrodes

32. AWS D1.1 Structural Welding Code – Steel

33. AWS QC1 Qualification and Certification of Welding Inspectors

34. California Building Code (CBC)

35. MIL A907E Antiseize Thread Compund, High-Temperature

36. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 206 “Miscellaneous Metal Items”

37. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 304 “Metal Fabrication and Construction”
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 554 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 3 of 8

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

DRAWINGS
Shop Drawings Submit for formed metal fabrications per structural Shop Drawing requirements .

MANUFACTURER’S LITERATURE
Product Data Submit for manufactured products per Product Data requirements.

Installation Instructions Submit per Installation Instructions requirements.

SAMPLES
Material Samples Submit upon request

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of
Compliance
Submit coating system and application certification per Certificate of Compliance requirements.

Foundry or Test
Record Transcripts
Submit for factory tests upon request per Foundry or Test Record transcript requirements.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, Certificates of Compliance, Foundry or Test Records, and Material Samples.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of metal fabrications.

C. Store materials above ground on platforms, skids, or other supports and protect from rain, dirt, grease, foreign matter, and corrosion.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

METAL FABRICATIONS
Fabricated Metalwork Desert Iron and Machine Works, Inc Thermal, CA (310) 773-0589 Accepted Equal
Stair Treads Harsco Industrial / IKG Aluminum Grating Stair Tread with Mebac Nosing
Channelview, TX (800) 324-8417
McNichols Company Type A-Standard with
Corrugated Angle Nosing
Tampa, FL (877) 884-4653
Nystrom Building Products Brooklyn Park, MN (800) 547-2635 SlipNOT Div. W S Molnar Co Detroit, MI (800) 754-7668
Accepted Equal

METAL PRODUCTS
Perforated Metal and
Expanded Metal
AMICO Div. Gibraltar Industries Birmingham, AL (800) 326-8842 Bobco Metals Los Angeles, CA (888) 304-5927
McNichols Company Tampa, FL (877) 884-4653
Metalex Libertyville, IL (888) 639-6382
Accepted Equal
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 555 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 4 of 8

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Refer to Standard Specifications for Public Works Construction (Greenbook) §206-1 for materials requirements for metal fabrications.

C. Structural steel shall conform to requirements of Section 05 12 00.

D. Structural aluminum shall conform to requirements of Section 05 14 00.

E. Materials for bolts, anchors and welds shall be:

ITEM MATERIAL SPECIFICATION

FASTENERS, AND CONNECTIONS
Post-Installed Concrete
Anchors
Refer to Section 05 05 19
Nuts, Bolts, Washers, and
Screws
Refer to Section 05 05 23
Welds and Electrodes Refer to Section 05 05 23

ANCHOR SYSTEMS
Concrete Anchors Refer to Section 05 05 19

METAL FABRICATIONS
Pipe Guards Steel Fabricate from ⅜” thick x 12” wide steel plate, bent to fit against wall or column at both ends and to fit around pipe with 2” clearance between pipe and pipe guard.

Drill each end for ¾” anchor bolts.

Finish Refer to Section 09 90 00.

METAL PRODUCTS
Chain Stainless Steel SAE Type 316
Length sufficient to provide 6” sag at center of opening spanned.

Steel Forgings Steel Conform to ASTM F3125
Class C forgings
≥0.35% carbon content, annealed
Brinell hardness 1.30-1.90 per ASTM E10
Washers (Stainless Steel) Stainless Steel SAE Type 316
Washers (Galvanized) Carbon Steel –
Galvanized
Square or rectangular smooth beveled washers, tapered in thickness
Galvanized Coating Refer to Section 09 92 00
F. Materials for metal shapes and members shall be:

ITEM MATERIAL SPECIFICATION
Hardware – Steel Including
Castings, Rolled, Pressed
and Forged Articles
Steel Hardware Conform to ASTM A36
Galvanized Coating Refer to Section 09 92 00
Aluminum Castings Aluminum Conform to ASTM B26 Alloy 443.0F Perforated Metal and
Expanded Metal
Stainless Steel SAE Type 316
Gauge as shown on Plans – Thickness ≥16 gauge
Steel Conform to ASTM F1267
Gauge as shown on Plans – Thickness ≥16 gauge
Galvanized Coating Refer to Section 09 92 00
Plate and Sheet – Stainless
Steel
Stainless Steel Conform to ASTM A167 or ASTM A240 SAE Type 316 StructuralMembers –
Stainless Steel
Stainless Steel SAE Type 316
G. The following product design criteria, options and accessories are required for metal products:

ITEM DESCRIPTION
Boat Snap Design Swivel Eye,
Size to match attached chain
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 556 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 5 of 8

ITEM DESCRIPTION
Chain – ASTM Grade 43
High Test
Size and Nominal
Strength
⅜” chain 5400-lb rated
½” chain 9200-lb rated
Eyebolt Size and Diameter ⅜” eyebolt (1”ID / 1-21/32”OD) ½” eyebolt (1-3/16”ID / 2-1/16”OD)
⅝” eyebolt (1⅜”ID / 2½”OD)
¾” eyebolt (1½”ID / 2-13/16”OD)
⅞” eyebolt (1-11/16” ID / 3¼”OD)
1” eyebolt (1-13/16”ID / 3-9/16”OD)
H. Wall thicknesses shall be:

GAUGE THICKNESS RANGE NOMINAL VALUE
20 0.0329”-0.0389” 0.0359”
18 0.0438”-0.0518” 0.0478”
16 0.0548”-0.0648” 0.0598”
14 0.0697”-0.0797” 0.0747”
12 0.986”-0.1106” 0.1046”
10 0.1285”-0.1405” 0.1345”
9 0.140”-0.150” 0.1495”
8 0.157”-0.167” 0.1644”
7 0.175”-0.185” 0.1793”
6 0.1943”
5 0.2092”
4 0.2242”
3 0.2391”
n/a 0.25”
2 0.2656”
1 0.2813”
0 0.3125”
00 0.3438”
000 0.3750”
0000 0.4063”
00000 0.4375”
000000 0.4688”
0000000 0.5000”
I. Before leaving shop, steel not shown or specified to be galvanized or stainless shall receive coat of pigmented primer recommended by Manufacturer of final paint system.

1. Parts inaccessible after assembly shall receive 2
nd coat of same primer.

2. Final painting shall conform to Section 09 90 00.

3. Galvanizing shall conform to Section 09 92 00.

PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to fabricate and install metal fabrications before submitting Shop Drawings or ordering.

1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Preassemble items in shop to greatest extent possible.

1. Use connections maintaining structural value of joined pieces.

C. Equip items to be cast into concrete or built into masonry with integrally welded steel strap anchors ≤8” from ends or corners and ≤24” on center.

D. Perform cutting, drilling, and fitting required to install metal fabrications.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 557 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 6 of 8

1. Fit exposed connections accurately together to form hairline joints.

2. Weld connections that are not to be left exposed but cannot be shop welded because of shipping size limitations.

3. Do not weld, cut, or abrade galvanized joining surfaces intended for bolted or screwed field connections.

4. Set fabrications accurately in location, alignment, and elevation, with edges and surfaces level, plumb, true, and free of rack and measured from established lines and levels.

E. Clean surfaces of metalwork to contact concrete, removing rust, dirt, grease and other foreign substances before concrete is placed.

1. On City’s request, coat steel surfaces (excluding nuts and bolts) to contact exposed concrete with protective sealant coating of accepted heavy bitumastic troweling mastic applied per Manufacturer’s application instructions before installing metalwork.

2. Coat aluminum surfaces to contact concrete with heavy alkali-resistant bituminous paint or 1 coat of zinc chromate.

3. Insulate aluminum surfaces from contact with dissimilar metals using neoprene gaskets or washers.

F. Where metalwork is to be installed in recesses in formed concrete, said recesses shall be made, metalwork installed, and recesses filled with dry-pack mortar in conformance with Section 03 32 10.

3.2 Installation
A. Refer to Sections 01 73 00 and 01 73 24 for execution and installation requirements.

B. Furnish and install metal fabrications at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 20 “Aluminum”

3. California Building Code Chapter 22 “Steel”

4. Other applicable building and fire code requirements

5. Manufacturer’s installation and warranty requirements

6. SSPWC Standard Specifications for Public Works Construction (Greenbook) §304 “Metal Fabrication and Construction”
D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Install metal fabrications to tolerances recommended by Manufacturer.

1. Unless otherwise shown, install metal fabrications true, plumb, and level using precision gauges and levels.

2. Cut, drill, and punch metals cleanly and accurately.

3. Remove burrs and ease edges.

4. Remove sharp or rough edges on exposed surfaces.

5. Joints shall have close fit with corner joints coped or mitered and in true alignment.

F. Where needed to complete and support Work, provide steel framing and supports as needed.

1. Fabricate support structures in sizes, shapes, and profiles necessary to support Work.

2. Use steel shapes, plates, and bars of welded construction conforming to Sections 05 12

00. and 05 05 23.

3. Fabricate steel pipe columns for supporting wood frame or other Work from steel pipe with steel baseplates and top plates.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 558 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 7 of 8

4. Drill or punch baseplates.

5. Add top plates for anchor and connection bolts and weld to pipe with fillet welds all around.

6. Make fillet welds same size as pipe wall thickness.

7. Fabricate shelf angles from steel angles of sizes shown for attachment to concrete or masonry.

8. Provide horizontally slotted holes to receive ¾” bolts spaced ≤6” from ends and ≤24” on center unless otherwise shown.

9. For cavity walls, provide vertical channel brackets to support angles from backup masonry and concrete.

10. Galvanize shelf angles located in exterior walls.

11. Prime shelf angles located in exterior walls with primer specified in Section 09 90 00.

12. Refer to Section 05 05 19 for post-installed concrete anchor requirements.

G. Fabricate seams and connections to be exposed to weather in manner excluding water.

1. Provide weep holes where water may accumulate.

H. Repair or recondition existing metal fabrications, where shown, as follows:

1. Disassemble Work as deemed necessary by City for proper repair or reconditioning.

2. Remove existing coatings.

3. Clean and prepare surfaces.

4. Perform visual inspection of metal.

5. Notify City’s Representative of major damage

6. Supplement with further NDE (MT, PT, UT) if necessary.

7. Repair minor damage.

8. Replace damaged anchors, hardware, and appurtenances.

9. Refurbish Work.

10. Recoat per Section 09 90 00

11. Repair galvanizing per Section 09 92 00.

12. Reassemble Work.

I. Refer to Section 05 05 19 for post-installed concrete anchors.

J. Form exposed connections with hairline joints, flush and smooth.

1. Locate joints where least conspicuous.

2. Conceal fastenings whenever possible.

K. Bolting for piping shall conform to Section 33 05 31.

L. Built-up parts shall be free of warp.

M. Exposed ends and edges of metal shall be slightly rounded.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 559 of 2077 ends

1-22-dp 05 50 00 – Metal Fabrications - 8 of 8

3.3 Field Quality Control
A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS
PAID
FOR BY
Metal
Fabrications
No Bends, Twists or
Open Joints
Visual inspection All metalwork City City
No Projecting Edges or
Corners at Intersections
Field Performance Demonstrate compliance to 1 test Contractor Contractor Contract Documents and
Manufacturer’s printed
literature
11-month Warranty Demonstrate compliance to 1 test City Contractor Inspection Contract Documents and
Manufacturer’s printed
literature

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 560 of 2077 ends

1-22-dp 05 51 00 – Stairs, Ladders, and Platforms - 1 of 6 SECTION 05 51 00

STAIRS, LADDERS, AND PLATFORMS
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of stairs, ladders, and platforms.

B. OSHA Standard 29 CFR 1926.1053 (a) requires fall protection be provided where length of climb on fixed ladders ≥ 24’ or where top of fixed ladder >24’ above lower levels.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 03 32 10: Cement Mortar
I. Section 05 05 19: Post-Installed Concrete Anchors
J. Section 05 05 23: Metal Fastenings and Welds
K. Section 05 14 00: Structural Aluminum Framing
L. Section 05 50 00: Metal Fabrications
M. Section 09 90 00: Painting and Coating
N. Section 33 05 38: Hangers and Supports

1.3 System Description
A. Furnish and install complete stairs and ladders where shown including appurtenant mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Workmanship and finish shall conform to requirements of American Welding Society and Aluminum Association, as applicable.

C. Connections and accessories shall safely withstand stresses and strains to which they will be subjected.

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. Aluminum Association Inc. Aluminum Construction Manual

2. Aluminum Association Inc. Specifications

3. ANSI / ASC A14.3 Ladders - Fixed - Safety Requirements

4. ANSI H35.2 Dimensional Tolerances for Aluminum Mill Products

5. ASTM A36 Carbon Structural Steel

6. ASTM A276 Stainless Steel Bars and Shapes

7. ASTM B209 Aluminum and Aluminum Alloy Sheet and Plate

8. ASTM B221 Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

9. ASTM B241 Aluminum and Aluminum-Alloy Seamless Pipe and Seamless Extruded Tube

10. ASTM B308 Aluminum-Alloy 6061-T6 Standard Structural Shapes DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 561 of 2077 ends

1-22-dp 05 51 00 – Stairs, Ladders, and Platforms - 2 of 6

11. ASTM D962 Standard Specification for Aluminum Pigments, Powder, and Paste

12. AWS A2.4 - Standard Symbols for Welding, Brazing and Non-destructive Examination

13. AWS A5.10 - Specification for Aluminum and Aluminum-Alloy Arc-Welding Electrodes

14. AWS D1.2 - Structural Welding Code - Aluminum

15. California Building Code (CBC)

16. California Mechanical Code (CMC) §904.10

17. OSHA Standard 29 CFR1910.24 Fixed Industrial Stairs

18. OSHA Standard 29 CFR1910.27 Fixed Ladders

19. OSHA Standard 29 CFR 1926.1053 Ladders

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

DRAWINGS
Shop Drawings Submit for fabricated stairs and ladders per structural Shop Drawing requirements
Show dimensions, sizes, thickness, gauges, materials, finishes, joint attachment and erection procedure.

Shop drawings shall be stamped and signed by California-licensed civil or structural engineer.
.

MANUFACTURER’S LITERATURE
Product Data Submit for manufactured products per Product Data requirements.

Installation Instructions Submit per Installation Instruction requirements

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of Compliance Submit coating system and application certification per Certificate of Compliance requirements.

Foundry or Test Record
Transcripts
Submit for factory tests upon request per Foundry or Test Record transcript requirements.

Welder Qualification
Certificates
Submit for welders performing Work.

Also submit certifications of procedure qualifications for each welding procedure used.

Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, Certificates of Compliance, Foundry or Test Records and Material Samples.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of stairs and ladders.

C. Store materials above ground on platforms, skids, or other supports and protect from rain, dirt, grease, foreign matter, and corrosion.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 562 of 2077 ends

1-22-dp 05 51 00 – Stairs, Ladders, and Platforms - 3 of 6 PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

LADDERS
Ladders – Aluminum Alaco Ladder Co. Chino, CA (909) 591-7561 City Tool Works, Inc. Ontario, CA (909) 923-8080
WernerCo. Inc. Greenville, PA (888) 229-7727
Accepted equal
Ladders – Fiberglass WernerCo. Inc. Greenville, PA (888) 229-7727 Ultra Fiberglass Systems Milwaukee, WI (414) 461-5051
Accepted equal
Ladders – Stainless
Steel
City Tool Works, Inc. Ontario, CA (909) 923-8080
Inwesco Inc. Azusa, CA (626) 334-9304
Pipeline Products VL100 San Marcos, CA (800) 998-1079
Remco Machining and Fabrication Bloomington, CA (909) 877-3530 Accepted equal

FABRICATED STRUCTURES
Fabricated Aluminum
Structures
CST Industries, Inc. Conroe, TX (913) 621-3700
Gardena, CA (310) 353-5100
RPS Engineering, Incorporated Elburn, IL (847) 931-1950 Irwindale, CA (626) 856-5656
Ultraflote Corporation Houston, TX (713) 461-2100
Accepted Equal
STAIRS
FRP Ship Ladders Ultra Fiberglass Systems Milwaukee, WI (414) 461-5051 Accepted equal
Stair Treads and
Platforms
Hoertig, Inc. Fountain Valley, CA (714) 545-1575
Keene Building Products / Metalex Libertyville, IL (888) 639-6382 Lapeyre Stair New Orleans, LA (866) 433-5518
McNichols Company Tampa, FL (877) 884-4653
SlipNOT Div. W S Molnar Co. Detroit, MI (800) 754-7668
Accepted equal
Stairways - Fiberglass Structural Fiberglass, Inc. Bedford, PA (814) 623-0458 Accepted equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Materials for stairs and platforms shall be:

ITEM MATERIAL SPECIFICATION
Interior and
Exterior Stairs -
Aluminum
Aluminum Materials Aluminum
Dimensions Conform to Plans and OSHA Std CFR1910.24
Minimum Width ≥22” required by OSHA Std CFR1910.24
Allowable Slope 30º to 50º above horizontal required by OSHA Std CFR1910.24
Tread ≥8” deep slip-resistant tread required by OSHA Std CFR1910.24
Vertical
Clearance
≥7’ required by OSHA Std CFR1910.24
Platforms or
Landings
≥30” on 1 side required by OSHA Std CFR1910.24
Railings 30”-34” high required by OSHA Std CFR1910.24
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 563 of 2077 ends

1-22-dp 05 51 00 – Stairs, Ladders, and Platforms - 4 of 6 C. Before leaving shop, steel not shown or specified to be galvanized or stainless shall receive 1 coat of pigmented primer recommended by Manufacturer of final paint system.

1. Parts inaccessible after assembly shall receive 2
nd coat of same primer.

2. Final painting shall conform to Section 09 90 00.

D. The following design criteria are required for equipment specified in this section:

ITEM DESCRIPTION
Platforms and Stair Treads Live Load 100 psf or concentrated 300-lbf load at mid span whichever creates higher stress or deflection
Allowable Live Load
Deflection
<L/360 per CBC Table 1604.3 and ≤¼”,
Allowable Total Load
Deflection
<L/240 per CBC Table 1604.3 and ≤¼”,
Stair Tread Nosing Integral non-slip
PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to fabricate and install stairs and ladders before submitting Shop Drawings or ordering.

1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Clean surfaces of work to be in contact with concrete, removing rust, dirt, grease and other foreign substances before concrete is placed.

C. Coat aluminum surfaces to contact concrete with heavy alkali-resistant bituminous paint or one coat of zinc chromate.

D. Insulate aluminum surfaces from contact with dissimilar metals using neoprene gaskets or washers.

E. Secure embedded metalwork accurately in position when concrete is placed to prevent displacement or undue vibration during or after placement of concrete.

F. Where Work is to be installed in recesses in formed concrete, said recesses shall be made, Work installed, and recesses filled with dry-pack mortar in conformance with Section 03 32

10. 3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install stairs and ladders at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations.

2. Applicable building and fire code requirements

3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to Owner’s Representative.

E. Install stairs and ladders to tolerances recommended by Manufacturer.

1. Unless otherwise shown, install stairs and ladders true, plumb and level using precision gauges and levels.

F. Welding shall comply with Section 05 05 23.

1. Continuously weld permanent connections along entire area of contact.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 564 of 2077 ends

1-22-dp 05 51 00 – Stairs, Ladders, and Platforms - 5 of 6 G. Bolting shall comply with Section 05 05 23.

1. Conceal fastenings whenever possible.

H. Joints shall have a close fit with corner joints coped or mitered and in true alignment.

I. Built-up parts shall be free of warp.

J. Exposed ends and edges of work shall be slightly rounded.

K. Mount ladders so clearance from back of ladder to wall behind ladder exceeds 7”.

3.3 Field Quality Control
A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Stairs
and
Ladders
No bends, twists or
open joints
No projecting edges
or corners at
intersections
Visual inspection All work Owner Owner
Field Performance Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-month Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Owner Contractor

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 565 of 2077 ends

1-22-dp 05 52 00 – Railings - 1 of 5
SECTION 05 52 00

RAILINGS
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of railings and handrails.

B. Refer to Section 05 05 19 for post-installed anchor bolts.

C. Refer to Section 05 05 23 for metal fastenings and welds.

D. Unless otherwise noted, refer to APWA Southern California Chapter Standard Plans for Public Works Construction Standard Drawing 606 for requirements for metal hand railings.

E. Conform to Standard Specifications for Public Works Construction (Greenbook) §206-5, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 03 30 00: Cast-in-Place Concrete
I. Section 03 32 10: Cement Mortar
J. Section 05 05 19: Post-Installed Concrete Anchors
K. Section 05 05 23: Metal Fastenings and Welds
L. Section 05 50 00: Metal Fabrications
M. Section 05 51 00: Stairs, Ladders, and Platforms
N. Section 09 90 00: Painting and Coating
O. Section 33 05 38: Hangers and Supports

1.3 System Description
A. Furnish and install complete handrails and railings where shown including appurtenant mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in the necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. Aluminum Association Standard 1 – Aluminum Standards and Data

2. Aluminum Association Standard for Anodized Architectural Aluminum

3. ASTM A53 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

4. ASTM B26 Aluminum-Alloy Sand Castings

5. ASTM B209 Aluminum and Aluminum Alloy Sheet and Plate

6. ASTM B221 Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

7. ASTM B241 Aluminum and Aluminum-Alloy Seamless Pipe and Seamless Extruded Tube

8. ASTM B429 Aluminum-Alloy Extruded Structural Pipe and Tube

9. ASTM B487 Measurement of Metal and Oxide Coating Thickness by Microscopical Examination of Cross Section DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 566 of 2077 ends

1-22-dp 05 52 00 – Railings - 2 of 5

10. ASTM F880 Stainless Steel Socket, Square Head, and Slotted Headless-Set Screws

11. ASTM F912 Alloy Steel Socket Set Screws

12. AWS/ANSI D1.1 Structural Welding Code – Steel

13. AWS/ANSI D1.2 Structural Welding Code – Aluminum

14. AWS/ANSI D1.6 Structural Welding Code – Stainless Steel

15. California Building Code (CBC)

16. OSHA Standard 29 CFR 1926.502b “Guardrail Systems”

17. OSHA Standard 29 CFR 1926.502b “Guardrail Systems”

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

DRAWINGS
Shop Drawings Submit for fabricated and formed handrails and railings per structural Shop Drawing requirements
.

MANUFACTURER’S LITERATURE
Product Data Submit for manufactured products per Product Data requirements.

Installation Instructions Submit per Installation Instruction requirements

SAMPLES
Material Samples Submit upon request

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of
Compliance
Submit coating system and application certification per Certificate of Compliance requirements.

Engineering
Calculations
Required for submitted handrail systems <2” diameter or < Schedule 80 per Engineering Calculations requirements.

Foundry or Test
Record Transcripts
Submit for factory tests upon request per Foundry or Test Record Transcript requirements.

Welder Qualification
Certificates
Submit for welders performing Work on this project.

Also submit certifications of procedure qualifications for each welding procedure used.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, Certificates of Compliance, Engineering Calculations, Foundry or Test Record Transcripts and Material Samples.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of handrails and railings.

C. Store materials above ground on platforms, skids, or other supports and protect from rain, dirt, grease, foreign matter, and corrosion.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

HANDRAIL
Handrail - Aluminum Alumarail Manuracturing, Inc. Woodbridge, ON (877) 258-6288 Golden Railings, Inc. Broomfield, CO (303) 279-5807
Hanson Architectural Systems / C.R. Laurence Co. Hillsboro, OR (800) 599-2965 Hollaender Manufacturing Company “Interna-Rail” Cincinnati, OH (800) 772-8800 DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 567 of 2077 ends

1-22-dp 05 52 00 – Railings - 3 of 5

ITEM MANUFACTURER MANUFACTURER LOCATION
Hollaender Manufacturing Company “Speed-Rail” Cincinnati, OH (800) 772-8800 Idealshield Detroit, MI (866) 825-8659
Accepted Equal

ACCESSORIES
Perforated Metal and
Expanded Metal
McNichols Company Tampa, FL (877) 884-4653
Accepted Equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Materials for aluminum handrails shall be:

ITEM MATERIAL SPECIFICATION
Handrails –
Aluminum
Aluminum Base Metal Anodized Aluminum Conform to ASTM B241 Alloy 6005-T5, 6061-T6, or 6063-T6
fy ≥ 25ksi
Pipe and Tubing Aluminum Alloy Conform to ASTM B241 or ASTM B429
Slip-on or Bolt-on Fittings Aluminum Alloy Conform to ASTM B26 Plates and Sheets Aluminum Alloy Conform to ASTM B209
Rods, Bars, or Shapes Aluminum Alloy Conform to ASTM B221 Dimensions Conform to Plans, CBC
Chapter 10 and OSHA Std
CFR1926.502
Top Bar Height
Guardrails
Conform to CBC §1013 42” above base ± 3” for guard rails Top Bar Height Staircase
and Ramp Handrails
Conform to CBC §1012 34-38” above stair tread nosings or ramp slope
Intermediate Bars Conform to CBC §1013 As required to prevent passage of 21”-diameter sphere
Bar Diameter Conform to CBC §1607A.7 2” except where Engineering Calculations are submitted to
document 1½” pipe will resist 200-lbf
horizontal load applied to top rail
Tube Wall Thickness Conform to CBC §1607A.7 Schedule 80 except where Engineering Calculations are
submitted to document Schedule 40
pipe will resist 200-lbf horizontal load
applied to top rail
Finish (Refer to and
conform to Aluminum
Association Standard 1)
Mechanical Finish M10 Unspecified
Chemical Finish C22 Medium matte sodium
hydroxide etch
Anodic Coating Conform to Aluminum Association
Standard for Anodized Architectural
Aluminum Class I Anodic Coating,
AA-C22
A41 0.7-mil thick clear coating
Set Screws Steel Conform to ASTM F912
Plate per ASTM B633 followed by
trivalent conversion & JS600 topcoat
≥ 6 µm thick measured per ASTM
B487
Stainless Steel Conform to ASTM F880 SAE Type
302
Stainless Steel Hardware SAE Type 316
Handrail Safety
Chain
Stainless Steel Type 316 Type of Chain Straight link chain 3/16” diameter
Links per Foot 12 links minimum per foot
Chain Length 4” longer than access opening
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 568 of 2077 ends

1-22-dp 05 52 00 – Railings - 4 of 5

ITEM MATERIAL SPECIFICATION
Chains Required 2 each opening
Mounting Height – top chain 42” above floor
Mounting Height – lower chain 24” above floor
Snaphooks boat snap at each end
Guardrail -
Aluminum FreeStanding
Anodized Aluminum Pipe
or Alloy 6005-T5, 6061-
T6 or 6063-T6
Conform to ASTM B241
Clear satin anodized finish 0.7
mil AA-M10-C22-A41
Dimensions Conform to Plans, CBC
Chapter 10 and OSHA Std
CFR1926.502
Top Bar Height
Guardrails
Conform to CBC §1013 42” above base ± 3” for guard rails Top Bar Height Staircase
and Ramp Handrails
Conform to CBC §1012 34-38” above stair tread nosings or ramp slope
Intermediate Bars Conform to CBC §1013 As required to prevent passage of / 21”-diameter sphere
Bar Diameter Conform to CBC §1607A.7 1½” or 2” as required to resist 200- lbf horizontal load applied to top rail
Stainless Steel Hardware SAE Type 316
PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to fabricate and install handrails and railings before submitting shop drawings or ordering.

1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Clean surfaces of metalwork to be in contact with concrete, removing rust, dirt, grease and other foreign substances before concrete is placed.

C. Aluminum surfaces to contact concrete shall be coated with heavy alkali-resistant bituminous paint or one coat of zinc chromate.

D. Aluminum surfaces to contact dissimilar metals shall be insulated from dissimilar metals using neoprene gaskets or washers.

E. All embedded metalwork shall be secured accurately in position when concrete is placed to prevent displacement or undue vibration during or after placement of concrete.

F. Where metalwork is to be installed in recesses in formed concrete, said recesses shall be made, metalwork installed, and recesses filled with dry-pack mortar in conformance with Section 03 32 10.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install handrails and railings at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. Applicable building code requirements

3. AWS D1.2 Structural Welding Code – Aluminum

4. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 569 of 2077 ends

1-22-dp 05 52 00 – Railings - 5 of 5
E. Install handrails and railings to tolerances recommended by Manufacturer.

1. Unless otherwise shown, install handrails and railings true, plumb, and level using precision gauges and levels.

2. Do not erect railings on structures until concrete to which it attaches is completed and falsework supporting concrete is released.

3. For structures on horizontal or vertical curves, railing shall conform to curvature of structure using series of short chords.
a. Lengths of chords shall be distance center-to-center of rail posts.

4. Erect vertical rails on anchor bolts or in holes formed by inserts provided in concrete railing base to receive railing posts.
a. Remove sheet metal inserts before erecting railing.

5. Carefully erect railing true to line and grade.
a. Misalignment at any joint between two panels shall be ≤ 1/16”. b. Deviation of posts or balusters from vertical shall be ≤ ⅛” c. Joints shall be matchmarked.
d. Joints shall have close fit with corner joints coped or mitered and in true alignment.

6. Built-up parts shall be free of warp.

7. After erecting railing, repair abrasions in exposed metal.

F. Welding shall comply with Section 05 05 23.

1. Continuously weld permanent connections along entire contact area.

2. Grind welds flush with adjacent surfaces.

G. Bolting shall comply with Section 05 05 23.

1. Conceal fastenings whenever possible.

3.3 Field Quality Control
A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Handrails
and
Railings
No bends, twists or
open joints
No projecting
edges or corners
at intersections
Visual inspection All metalwork City City
Alignment Maximum variation of adjacent railing
panels within 1/16”
All joints City City
Posts and balusters vertical with
maximum ⅛” deviation from vertical
All posts City City
Field Performance Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-month Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 570 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 1 of 9
SECTION 05 53 00

GRATINGS AND FLOOR PLATES
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of metal gratings, metal floor plates.

B. Materials, testing, and installation of metal frames and supports for gratings.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 65 00: Product Delivery Requirements
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 73 00: Execution
H. Section 03 32 10: Cement Mortar
I. Section 05 05 19: Post-Installed Concrete Anchors
J. Section 05 05 23: Metal Fastenings and Welds
K. Section 05 50 00: Metal Fabrications
L. Section 09 90 00: Painting and Coating
M. Section 09 92 00: Galvanizing
N. Section 33 05 38: Hangers and Supports

1.3 System Description
A. Design gratings, floor plates, and supports to incorporate design criteria and performance requirements shown.

B. Furnish and install complete grating and/or floor plate system where shown, including mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Conform to NAAMM MBG 531 and NAAMM MBG 532.

1. Form gratings from materials of size, thickness, and shapes shown, but not less than required to support indicated loads.

2. Fit exposed connections accurately together to form hairline joints.

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ANSI H35.2 Dimensional Tolerances for Aluminum Mill Products

2. ANSI/ASME B18.15 Forged Eyebolts

3. ASTM A36 Carbon Structural Steel

4. ASTM A123 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

5. ASTM A153 Zinc Coating (Hot-Dip) on Iron and Steel Hardware

6. ASTM A167 Stainless and Heat-Resisting Chromium Nickel Steel Plate, Sheet, and Strip

7. ASTM A193 Alloy-Steel and Stainless Steel Bolting Materials for High-Temperature Service

8. ASTM A194 Carbon and Alloy Steel Nuts for High-Pressure and High Temperature Service

9. ASTM A276 Stainless Steel Bars and Shapes
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 571 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 2 of 9

10. ASTM A325 Structural Bolts, Steel, Heat Treated 120/105 ksi Minimum Tensile Strength

11. ASTM A489 Carbon Steel Lifting Eyes

12. ASTM A490 Heat-Treated Steel Structural Bolts 150ksi Minimum Strength

13. ASTM A510 Wire Rods and Coarse Round Wire, Carbon Steel

14. ASTM A653 Steel Sheet, Zinc-Coated (Galvanized) or Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process

15. ASTM A666 Annealed or Cold-Worked Austenitic Stainless Steel Sheet, Strip, Plate, And Flat Bar

16. ASTM A793 Rolled Floor Plate, Stainless Steel

17. ASTM A1008 Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution-Hardened, and Bake-Hardenable

18. ASTM A1011 Steel, Sheet and Strip, Hot-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength

19. ASTM A1018 Steel, Sheet and Strip, Heavy-Thickness Coils, Hot-Rolled, Carbon, Commercial, Drawing, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, and Ultra-High Strength

20. ASTM B6 Zinc

21. ASTM B209 Aluminum and Aluminum Alloy Sheet and Plate

22. ASTM B221 Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes

23. ASTM B241 Aluminum and Aluminum-Alloy Seamless Pipe and Seamless Extruded Tube

24. ASTM B308 Aluminum-Alloy 6061-T6 Standard Structural Shapes

25. ASTM B633 Electrodeposited Coatings of Zinc on Iron and Steel

26. ASTM E84 Surface Burning Characteristics of Building Materials

27. ASTM F541 Alloy Steel Eyebolts

28. ASTM F593 Stainless Steel Bolts, Hex Cap Screws and Studs

29. ASTM F594 Stainless Steel Nuts

30. AWS D1.1 Structural Welding Code – Steel

31. MIL-G-18015 A (Ships) Aluminum Planks. (6063-T6)

32. NAAMM MBG 531 Metal Bar Grating Manual

33. NAAMM MBG 532 Heavy-Duty Metal Bar Grating Manual

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

DRAWINGS
Shop Drawings Submit for fabricated gratings, floor plates and cover plates per structural Shop Drawing requirements
.

Submit layout drawings for grating, showing direction of span, type and depth of gratings, size and shape of grating panels, seat angle details, and details of grating hold-down fasteners.

MANUFACTURER’S LITERATURE
Product Data Submit for gratings per Product Data requirements.

Submit load and deflection tables for each style and depth of grating used.

Submit data for clips and anchorage devices.

Submit data on shop-applied coatings.

Installation Instructions Submit per Installation Instructions requirements.

Include Manufacturer’s recommendations for reinforcing cut openings.

SAMPLES
Material Samples Submit on request

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Engineering Calculations Submit for grating and grating support systems, including seismic anchorage calculations.

Grading and grating support calculations may be omitted for grating frames embedded in concrete.

Foundry or Test Record
Transcripts
Submit for factory tests upon request per Foundry or Test Record transcript requirements.

Welder Qualification
Certificates
Submit for welders performing work on this project.

Also submit certifications of procedure qualifications for each welding procedure used.

CLOSEOUT SUBMITTALS
Warranty Furnish 1-year warranty from date of final acceptance DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 572 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 3 of 9
B. Refer to Section 01 33 00 for definition of requirements for Shop Drawings, Product Data, Installation Instructions, Certificates of Compliance, Foundry or Test Records and Material Samples.

1.7 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of gratings and floor plates.

C. Store materials above ground on platforms, skids, or other supports and protect from rain, dirt, grease, foreign matter, and corrosion.

1. Protect composite gratings from UV exposure.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

GRATING SYSTEMS
Grating - Aluminum Grating Pacific, Inc. Los Alamitos, CA (562) 598-4314 Harsco Industrial / IKG Channelview, TX (800) 324-8417
McNichols Company Tampa, FL (877) 884-4653
SlipNOT Div. W S Molnar Co. Detroit, MI (800) 754-7668
Accepted Equal
Grating – Fiberglass
Reinforced
Polymners (FRP)
Aetna Plastics Corporation “Chemgrate®: or “Fibergrate®” Valley View, OH (800) 634-3074 American Grating “Gridwalk SuperSpan” Henderson, NV (702) 567-0303 Bedford PROGrid® and PROGrate® Bedford, PA (800) 377-3280 Delta Composites, LLC (HS) Houston, TX (713) 225-3225
Enduro Composites Houston, TX (281) 921-9002
Fibergrate Composite Structures, Inc. Stephenville, TX (254) 965-3148 Grating Pacific, Inc. Los Alamitos, CA (562) 598-4314
Harsco Industrial IKG Channelview, TX (281) 452-6637
International Grating, Inc. Houston, TX (713) 633-0982
Grating Pacific, Inc. Los Alamitos, CA (562) 598-4314
McNichols Company Tampa, FL (877) 884-4653
Seasafe, Inc. Lafayette, LA (337) 406-2345
SlipNOT Div. W S Molnar Co. Detroit, MI (800) 754-7668
Strongwell Corporation “Duradek” Chatfield, MN (276) 645-8054 Ultra Fiberglass Systems Milwaukee, WI (414) 461-5051
Accepted Equal
Grating – Cast Iron Alhambra Foundry Company Ltd. Alhambra, CA (626) 289-4294 Long Beach Iron Works, Inc. Long Beach, CA (562) 432-5451 Neenah Foundry Ontario, CA (626) 602-6796
South Bay Foundry Santee, CA (619) 956-2780
U S Foundry and Manufacturing Corp Medley, FL (305) 885-0301 Accepted Equal
Grating – Steel Grating Pacific, Inc. Los Alamitos, CA (562) 598-4314 Inwesco Inc. Azusa, CA (626) 334-9304
McNichols Company Tampa, FL (877) 884-4653
SlipNOT Div. W S Molnar Co. Detroit, MI (800) 754-7668
Accepted Equal

GRATING PLANKS AND TRENCH COVERS
Grating Planks - Harsco Industrial / IKG Channelview, TX (800) 324-8417 DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 573 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 4 of 9

ITEM MANUFACTURER MANUFACTURER LOCATION
Aluminum Accepted Equal
Safety Grating
Planks - Steel
Harsco Industrial / IKG “Deck Span” Channelview, TX (800) 324-8417 Cooper B-Line / Eaton “Grip Strut” Highland, IL (800) 851-7415 Accepted Equal

GRATING ACCESSORIES
Grating Anchor
Systems
Struct-Fast® Grate-Fast Easton, MD (800) 327-6719
Accepted Equal
Grating Pedestals -
Fiberglass
Grating Pacific, Inc. Los Alamitos, CA (562) 598-4314
Ultra Fiberglass Systems Milwaukee, WI (414) 461-5051
Accepted Equal
Lifting Eyebolts Cleveland City Forge Wellington, OH (440) 647-5400 Sierra Pacific Engineering and Products Long Beach, CA (800) 433-5554 Accepted Equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Materials for gratings, floor plates and cover plates shall be:

ITEM MATERIAL SPECIFICATION
Cover Plates –
Checkered Aluminum
Aluminum Conform to one of the following:

ASTM B308 Alloy 6061 T6 temper (Fy=35ksi, fu=38ksi E=10,000ksi) Thickness 3/16”
Lug Pattern Shall have raised lug pattern on top face and smooth bottom face.

Provide lugs ≥1” long raised at least ½” above surface.

Lug pattern shall orient lugs at 90° from adjacent lugs in 2 orthogonal directions.

Orient rows of lugs 45° from plate edges.

Thickness As required to limit total-load deflection to <L/240 per CBC Table 1604.3 or ¼”, whichever is less
Frame Miter and weld corners of embedded angle frames and grind welds smooth.

Abrasive Surface For abrasive-surface floor plate roll abrasive granules into surface or bond abrasive material metallically to steel
Lifting Handles Provide each removable section with U-bolt lifting handles located at opposite ends.

Angle Supports Aluminum to match floor plate material
Cover Plates –
Checkered Steel
Welded Mild Carbon
Structural Steel
Conform to ASTM A789 for dimensions and fabrication
Conform to one of the following for steel properties
ASTM A36 (Fy=36ksi, Fu=58ksi, E=29000ksi
ASTM A283 Grade C (Fy=30ksi, Fu=55ksi, E=29000ksi)
ASTM A283 Grade D (Fy=33ksi, Fu=60ksi, E=29000ksi)
Thickness 3/16”
Galvanized Coating Refer to Section 09 92 00.

Lug Pattern Shall have raised lug pattern on top face and smooth bottom face.

Provide lugs ≥1” long raised at least ½” above surface.

Lug pattern shall orient lugs at 90° from adjacent lugs in 2 orthogonal directions.

Orient rows of lugs 45° from plate edges.

Thickness As required to limit total-load deflection to <L/240 per CBC Table 1604.3 or ¼”, whichever is less
Frame Miter and weld corners of embedded angle frames and grind welds smooth.

Abrasive Surface For abrasive-surface floor plate roll abrasive granules into surface or bond abrasive material metallically to steel
Lifting Handles Provide each removable section with U-bolt lifting handles located at opposite ends.

Angle Supports Steel to match floor plate material
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 574 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 5 of 9

ITEM MATERIAL SPECIFICATION
Cover Plates –
Checkered Stainless
Steel
Welded Stainless
Steel
Conform to the following for materials, dimensions and fabrication SAE Type 316/316L
ASTM A793 (Fy=31ksi, Fu=73ksi, E=29000ksi
Thickness 3/16”
Lug Pattern Shall have raised lug pattern on top face and smooth bottom face.

Provide lugs ≥1” long raised at least ½” above surface.

Lug pattern shall orient lugs at 90° from adjacent lugs in 2 orthogonal directions.

Orient rows of lugs 45° from plate edges.

Thickness As required to limit total-load deflection to <L/240 per CBC Table 1604.3 or ¼”, whichever is less
Frame Miter and weld corners of embedded angle frames and grind welds smooth.

Abrasive Surface For abrasive-surface floor plate roll abrasive granules into surface or bond abrasive material metallically to steel
Lifting Handles Provide each removable section with U-bolt lifting handles located at opposite ends.

Angle Supports Stainless steel to match floor plate material Grating – PressureLocked Aluminum I-Bar
Aluminum Conform to the following:

ASTM B221 Alloy 6063 T42 temper (Fy=11ksi, Fu=23ksi E=9,900ksi) Size – Refer to Plans
Aluminum Frame Conform to the following:

ASTM B221 Alloy 6063 T42 temper (Fy=11ksi, Fu=23ksi E=9,900ksi) Miter and weld corners of embedded angle frames and grind welds smooth.

Grating – Fiberglass Fiberglass Size – Refer to Plans
Molded fiber-reinforced polymer (FRP) composite (yellow) Core Unidirectionally aligned glass fibers
Mat Standard corrosion liner
Veil Standard corrosion liner
Ultraviolet Stabilizer Add to exterior surfaces in type and amount recommended by resin manufacturer.

Color As selected by City’s Representative
Skid-Resistant
Coating
Anti-slip permanently-bonded grit coating of selected color.

Flame Spread ≤25 per ASTM E84
Clips, Saddles, and
Fastener
Components
Stainless Steel SAE Type 316
Stainless Steel
Frame
SAE Type 316
Miter and weld corners of embedded angle frames and grind welds smooth.

Grating – Steel Welded Steel Bars Conform to one of the following:

ASTM A36 (Fy=36ksi, Fu=58ksi, E=29000ksi)
ASTM A1011 Grade 36 Type 2 (Fy=36ksi, Fu=58.3ksi, E=29000ksi) ASTM A1018 Grade 50 (Fy=50ksi, Fu=65.3ksi, E=29000ksi)
Size – Refer to Plans
Wire Rod for
Grating Crossbars
Conform to ASTM A510
Steel Frame Conform to one of the following:

ASTM A36 (Fy=36ksi, Fu=58ksi, E=29000ksi)
ASTM A1011 Grade 36 Type 2 (Fy=36ksi, Fu=58.3ksi, E=29000ksi) ASTM A1018 Grade 50 (Fy=50ksi, Fu=65.3ksi, E=29000ksi)
Frame – Miter and weld corners of embedded angle frames and grind welds smooth.

Galvanized Coating Refer to Section 09 92 00.

Grating Planks -
Aluminum
Aluminum Conform to the following:

ASTM B221 Alloy 6063 T42 temper (Fy=11ksi, Fu=23ksi E=9,900ksi) DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 575 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 6 of 9

ITEM MATERIAL SPECIFICATION
Conform to MIL-G-18015 Type II or IV
Extruded in 6” widths with integral I-bar bearing bars at ≤6” on center.

Top surface solid with raised ribs unless otherwise shown.

Depth – ¾” / 1” / 1¼” / 1½” / 1¾” / 2” / 2¼” / 2½”
Planks shall have continuous tongue-and-groove interlock at each side, except interlocking planks shall be arranged so any 4’ wide section may be removed independently from neighboring grating sections Top Surface Pattern – Unpunched, / Rectangular pattern of 3” by 19/32” rectangular openings spaced 4” on center / 13/16” holes spaced 1 ½” on-center / 1” holes spaced 2” on-center
Aluminum Frame Conform to the following:

ASTM B221 Alloy 6063 T42 temper (Fy=11ksi, Fu=23ksi E=9,900ksi) Miter and weld corners of embedded angle frames and grind welds smooth.

Safety Grating Planks -
Steel
Sheet Steel Punched into 1⅞” by 11/16” open serrated diamond-shape pattern formed into plank sections.

Galvanized Coating Refer to Section 09 92 00.

Bolts – Embedded
Eyebolts and Lifting
Eyebolts
Stainless Steel Conform to ASTM F541 SAE Type 316
Dimensions per ANSI/ASME B18.15
Welded eye type
C. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION
Gratings Grating shall be fully banded including cutouts for penetrations ≥1.0” before galvanizing or installation.

Design Live Load Rating
(Outdoor Paved Areas)
AASHTO H-25 Loading
Design Live Uniform
Load Rating (Indoors or
Areas Above Pavement
Elevation)
Refer to Structural Load Sheet S1 for Floor Loads / 300 / 200 / 100 / 60 psf or 1000 / 300 / 250 / 300-lbf
concentrated load at midspan, whichever produces
greater stress or deflection
Span Refer to Plans / XX ft
Allowable Live Load
Deflection
<L/360 per CBC Table 1604.3 or ¼”, whichever is less
Allowable Total Load
Deflection
<L/240 per CBC Table 1604.3 or ¼”, whichever is less
Maximum Weight of any
Piece or Leaf
80 lbs
Minimum Depth (Steel) See plans / ≥ 1” / 1¼” / 1½ / 1¾” / 2” / 2¼” / 2½” / 3” / 3½” / 4” / 5” / 6” / 7”
Minimum Depth
(Aluminum)
See plans / ≥ 1” / 1¼” / 1½ / 1¾” / 2” / 2¼” / 2½” / 3” / 3½” / 4” / 5” / 6” / 7”
Bearing Bar Size or
Flange Width
≥ ¼” / 5/16” / ⅜” / ½”
Bearing Bar Spacing
(Steel)
≤ 15/16” / 1-3/16” / 1⅜” / 1⅞” / 2⅜”
Bearing Bar Spacing
(Aluminum)
≤ 15/16” / 1-3/16” / 1⅜” / 1⅞” / 2⅜”
Minimum Moment of
Inertia (Imin)
Refer to plans / XXX in4/ft
Minimum Section
Modulus (Smin)
Refer to plans / XXX in3/ft
Substitutions in bar width and spacing may be proposed if section modulus is not compromised.

Traffic Surface Abrasive Grit Coating
Spans Fabricate single sections for each span.

Do not clamp 2 or more grating sections together within spans.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 576 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 7 of 9

ITEM DESCRIPTION
Cross Bars (Steel) Size ≥⅜” @ 6” on center
Weld or mechanically lock bars into position so no
movement occurs between bearing and cross bars.

Cross Bars (Aluminum) Size ≥⅜” @ 4” on center
Weld or mechanically lock bars into position so no
movement occurs between bearing and cross bars.

Cutouts Provide where required for equipment access or
penetrations, including valve operators, stems, and gate frames.

Arrange cutouts to permit grating removal without
disturbing items penetrating gratings.

Banding Fully band grating perimeters.

Fully band cutouts or openings interrupting 4 or more
bearing bars with bars of same size and material as
bearing bars before galvanizing or installation
Fully band other cutouts for penetrations ≥1.0” before
galvanizing or installation.

Weld banding to each cut bearing bar.

Banding shall use same material and cross section as
bearing bars.

Clearances Provide ≤⅛” clearance between grating ends and inside face of vertical support angles.

Finish (Aluminum) Class I clear anodized finish
Toeplates Fabricate toeplates for attaching in field.

Lifting Eyebolts Size and Diameter ⅜” eyebolt (1”ID / 1-21/32”OD) ½” eyebolt (1-3/16”ID / 2’1/16” OD)
⅝” eyebolt (1⅜” ID / 2½”OD)
¾” eyebolt (1½”ID / 2-13/16”OD)
⅞” eyebolt (1-11/16”ID / 3¼”OD)
1” eyebolt (1-13/16”ID / 3-9/16”OD
Fastenings Fasten grating pieces in 2 locations to each support.

Non-Slip Nosings at Stairway
Tops
Grating edges forming top riser for stairways shall have integral non-slip nosing of width equal to stairway.

Support Angles Support Around
Openings
Fabricate from metal shapes, plates, and bars of welded construction to sizes, shapes, and profiles needed to
receive gratings.

Miter and weld connections for perimeter angle frames.

Provide support angles matching grating material around openings.

Support angles in concrete shall be embedded.

Miter and weld angles at corners
Floor Plates and Cover Plates Thickness ¼” / ½” / ¾” / 1” D. Cut, drill, tap, and punch materials to receive hardware cleanly and accurately.

1. Remove burrs and ease edges to approximate 1/32” radius.

2. Remove sharp or rough areas on exposed surfaces.

E. Refer to Section 09 92 00 for galvanizing.

F. Before leaving shop, carbon steel not shown or specified to be galvanized or in contact with concrete shall receive one coat of pigmented primer recommended by Manufacturer of final paint system. Parts inaccessible after assembly shall be given second coat of same primer.

G. Final painting shall conform to Section 09 90 00.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 577 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 8 of 9
PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to fabricate and install gratings and floor plates before submitting shop drawings or ordering.

1. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Clean surfaces of metalwork to be in contact with concrete, removing rust, dirt, grease and other foreign substances before concrete is placed.

C. Aluminum surfaces to contact concrete shall be coated with heavy alkali-resistant bituminous paint or one coat of zinc chromate.

D. Aluminum surfaces to contact dissimilar metals shall be insulated from dissimilar metals using neoprene gaskets or washers.

E. Secure embedded metalwork accurately in position when concrete is placed to prevent displacement or undue vibration during or after placement of concrete.

F. Where metalwork is to be installed in recesses in formed concrete, said recesses shall be made, metalwork installed, and recesses filled with dry-pack mortar in conformance with specifications in Section 03 32 10.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install gratings and floor plates at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations.

2. Applicable building code requirements.

3. Manufacturer’s installation and warranty requirements.

D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Install channels, angle seats, gratings and floor plates to tolerances and installation clearances recommended by Manufacturer.

1. Install channels, angle seats, gratings and floor plates true and level using precision gauges and levels.

2. Do not notch bearing bars at supports to maintain elevation.

3. Attach removable units to supporting members using type and size of clips and fasteners shown, or if not shown, as recommended by Manufacturer for type of installation conditions shown.

4. Attach nonremovable units to supporting members by welding where both materials are same.

5. Attach dissimilar materials by bolting as indicated above.

F. Attach fasteners and connections as follows:

1. Welding shall conform to Section 05 05 23.
a. Continuously weld permanent connections along entire area of contact.

2. Bolting shall conform to Section 05 05 23.
a. Conceal fastenings where possible.

3. Attach clips or saddles to bearing bars only.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 578 of 2077 ends

1-22-dp 05 53 00 – Gratings and Floor Plates - 9 of 9
G. Built-up parts shall be free of warp.

H. Exposed ends and edges of metal shall be slightly rounded.

I. Preassemble items in shop to extent possible.

1. With written permission of City’s Representative, minor or unforeseen access openings and banding of grating may be made in field.

2. Reinforce field-cut openings in accordance with Manufacturer’s instructions.

J. Set seat angles for grating flush with finished floor.

K. Maintain gratings and checker plates flush with finished floor.

L. Attach toeplates to gratings by welding at indicated locations.

3.3 Field Quality Control
A. Field testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Gratings
and Floor
Plates
No Bends, Twists
or Open Joints
No Projecting
Edges or Corners
at Intersections
Visual Inspection All gratings
and floor
plates
City City
Tolerances ≤ ⅛” in 3’ deviation from vertical
≤ ¼” in 20’ deviation from horizontal
≤ ¼” in 20’ deviation from Plan location
All gratings
and floor
plates
City City
Field
Performance
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test Contractor Contractor
11-Month
Warranty
Inspection
Demonstrate compliance to Contract
Documents and Manufacturer’s printed
literature
1 test City Contractor

END OF SECTION
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 579 of 2077 ends

SECTION 09 90 00

PAINTING AND COATING

IN SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
PART 1 - GENERAL

1.1 Work Included
A. Furnish labor, materials and equipment required for satisfactory preparation of surfaces and subsequent application of protective coatings.

B. Unless otherwise specified or directed by City’s Representative, paint all surfaces except:

1. Nameplates, Manufacturer’s data plates, UL labels, and stamping and instruction labels.

2. Grease fittings.

3. Threads of threaded fittings.

4. Mating, contacting, or rotating machined surfaces, operators, shafts, gears, linkages, bearings, packing glands, and sensing elements.

5. Platform gratings, stair treads, thresholds, and other walk surfaces.

6. Maintenance hole covers, and valve lids,

7. Aluminum or anodized aluminum items not in contact with concrete.

8. Stainless steel items.

9. Galvanized items.

10. Items embedded in concrete except aluminum.

11. Submerged brass or copper tubing.

12. Flexible items including flexible conduit, rubber items, and flexible or fabric connections to fans or ducts.

13. Buried pipe exteriors.

14. Pipe interiors.

15. Mortar-coated pipe and fittings.

16. Electrical conduit

17. Electrical wiring and insulation.

18. Factory-coated items having a complete factory finish, including control panels, and motors,
C. Protect surfaces not to be painted.

1. Prevent abrasive, solvent, surface preparation, or paint materials from falling on or marring adjacent surfaces.

2. Remove, mask, or use plastic or drop cloths to cover surfaces to be protected.

3. Protect working parts of mechanical and electrical equipment from damage during surface preparation and painting process.

4. Mask openings in motors and machinery to prevent paint, dust, and other materials from entering.

5. Remove masking materials and clean surfaces at completion of painting operations.

D. Coat contacting metal surfaces of structures to be bolted together as follows:

1. When bolted contact is to exist between mating surfaces of ferrous or metal parts of identical chemical composition, such surfaces need not be painted, but resulting crevices shall be watertight and filled or sealed with paint.

2. Protect such surfaces during shipping and handling.
a. Apply rust-resistant oil or coating to be removed before surfaces are mated.

3. Do not paint contacting metal surfaces formed by high-strength bolts in friction-type or flanged connections.

4. Where nonmetal surface is in bolted contact with metal surface, clean contacting metal DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 580 of 2077 ends

surfaces and coat metal with 3 coats of specified primer.

E. Structural steel, and metal floor decking which will not be exposed in final construction shall have no finish other than 1 coat of shop primer.

F. Shop primers on surfaces to be coated shall be treated as temporary coatings intended to prevent ferrous or other surfaces from oxidizing during shipment.

1. Shop primers shall be chemically compatible with field primers and topcoats of this section.

2. Shop primers shall conform to MPI#79 and be universal modified-alkyd primers, fast curing, and lead- and chromate-free.

3. Shop primers not conforming to MPI#79 shall be accepted in writing by topcoat manufacturer.

4. Shop primers shall contain pigments to make them easily distinguishable from specified zinc-rich field primers.

5. Bituminous primers over metal are incompatible with coating systems specified herein and shall be field-removed by sandblasting prior to primer application.

6. Specified field primers may cover non-bituminous shop primers provided finish coating system Manufacturer deems them compatible with coating system Manufacturer’s painting system.

7. Thicknesses of shop primers will not be counted toward thicknesses of field primers.

G. Conform to Standard Specifications for Public Works Construction (Greenbook) §210-1, §310, applicable permits, and requirements herein.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 61 00: Common Product Requirements
E. Section 01 63 00: Product Substitutions
F. Section 01 65 00: Product Delivery Requirements
G. Section 01 66 00: Product Storage and Handling Requirements H. Section 01 73 00: Execution
I. Section 01 73 33: Mechanical Identification
J. Section 01 74 00: Cleaning and Waste Management
K. Section 09 92 00: Galvanizing

1.3 Definitions
A. The following definitions apply:

1. Coating: Refer to definition of “paint” herein.

2. Dry Film Thickness (DFT): Thickness of fully cured coat of paint measured in mils (1/1000”).

3. Finish: Refer to definition of “paint” herein.

4. Paint: Surface treatments, emulsions, enamels, paints, epoxy resins and protective coatings other than anodizing or galvanizing, whether used as pretreatment, primer, intermediate coat, or finish coat

1.4 System Description
A. Furnish and install complete functional coating system for specified surface in compliance with applicable local air quality management regulations.

1. Comply with Manufacturer’s application requirements and applicable codes, standards, and South Coast Air Quality Management District regulations, including Rule 1107 for shop coating and Rule 1113 for field coating.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 581 of 2077 ends

1.5 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Equipment and its use shall conform to the following:

1. Use only good, clean brushes and equipment.
a. Clean brushes, buckets, and spraying equipment shall be cleaned immediately at end of each painting period.

2. Maintain Contractor’s painting and coating equipment in first-class working condition. a. Compressors shall have suitable traps and filters to remove water and oils from air. b. Perform blotter test at each start-up period and as deemed necessary by City’s Representative.

3. Steel wire brushes shall have sufficient rigidity to clean surface, shall be kept free of excess foreign matter, and shall be discarded when they are no longer effective.

4. Hand scrapers shall be made of suitable material ad kept sharp enough to be effective.

5. Brushes shall have sufficient body and bristle length to spread paint in uniform coat.

6. Rollers shall be of type that do not leave stippled texture in paint film.

7. On surfaces inaccessible for brushing, apply paint by spray or by sheepskin daubers especially made for this purpose.

8. Spraying shall be done by experienced operators.
a. Provide water trap acceptable to City’s Representative on spray painting equipment.

9. Use mechanical mixers to mix paint sufficient length of time before use to mix pigment and vehicle.
a. To keep pigment in suspension, keep paint mixed while being applied.

10. Use application equipment, tools, pressure settings and techniques in accordance with Manufacturer’s application instructions.

C. Paint shall be homogenous, free of contaminants, and of consistency suitable for intended use.

1. Pigment shall be finely ground and properly dispersed in vehicle such that pigment does not settle, cake, or thicken in container, or become granular or curdled.

D. Factory testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR BY

RETESTS PAID
FOR BY
Painting and
Coating
Materials
Compliance with
Contract
Requirements
Federal Standard 141 Test
representative
sample
Contractor Contractor
Paint from
Proposed
“equals”
Spectrographic
and Durability
Tests
Federal Standard 141
and applicable ASTM
standards
As directed Contractor Contractor
Valve, Pump,
Hydrant, Meter
and Pipeline
Appurtenance
Interiors
Holidays ASTM D5162
Certify as holiday free
using low voltage (22.5-
80V with approximately
80,000Ω resistance)
holiday detector and
sponge saturated with

0.5% sodium chloride
solution
Each lined item Contractor Contractor
Lining Thickness Verify thickness with
magnetic-type dry film
thickness gauge.

Each lined item Contractor Contractor
E. Surface preparation and priming operations accomplished offsite for prefabricated structural members will be monitored 100% by City-selected quality control inspector at City’s option.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 582 of 2077 ends

1. Where factory Work is performed >50 miles from jobsite, costs incurred by offsite inspection shall be borne by Contractor.

2. Refer to Section 01 40 00 for off-site inspection and reimbursement requirements.

F. Submit schedule of shop activities as specified below under “Submittals.” G. If shop Work is not scheduled on consecutive basis to facilitate scheduling of offsite inspector, expenses incurred by multiple trips to shop will be borne by Contractor.

H. Failure by City to exercise option for shop inspection shall in no way relieve Contractor of their duty to meet Contract requirements.

1.6 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ANSI Z55.1 Gray Finishes for Industrial Apparatus and Equipment

2. ANSI Z535 American National Standard for Safety Colors

3. ASTM D16 Terminology Relating to Paint, Varnish, Lacquer and Related Products

4. ASTM D449 Asphalt Used in Dampproofing and Waterproofing

5. ASTM D1187 Asphalt-Base Emulsions for Use as Protective Coatings for Metal

6. ASTM D4138 Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

7. ASTM D5162 Discontinuity (Holiday) Testing of Nonconductive Protective Coating on Metallic Substrates

8. ASTM D6386 Surface Preparation of Galvanized Surfaces

9. AWWA C550 Protective Epoxy Interior Coatings for Valves and Hydrants

10. California Green Building Standards Code (CALGreen Code)

11. Federal Specification TT-P-19 Paint, Latex (Acrylic Emulsion, Exterior Wood and Masonry)

12. Federal Specification TT-S-230 Sealing Compound, Synthetic Rubber Base, Single Component Chemically Curing

13. Federal Standard 141 Paint, Varnish, Lacquer, and Related Materials: Methods of Inspection, Sampling, and Testing

14. MPI#79 Primer, Alkyd, Anti-Corrosive for Metal

15. NACE 6D-173 Manual for Painter Safety

16. NACE RP0188 Discontinuity (Holiday) Testing of Protective Coatings

17. NSF/ANSI 61 Drinking Water System Components – Health Effects

18. NSF/ANSI 600 Health Effects Evaluation and Criteria for Chemicals in Drinking Water

19. SSPC Guide 12 Guide for Illumination of Industrial Painting Projects

20. SSPC PA1 Shop, Field and Maintenance Painting

21. SSPC PA2 Measurement of Dry Paint Thickness with Magnetic Gauges

22. SSPC PA3 Safety in Paint Applications

23. SSPC SP1 Solvent Cleaning

24. SSPC SP2 Hand Tool Cleaning

25. SSPC SP3 Power Tool Cleaning

26. SSPC SP5/NACE 1 White Metal Blast Cleaning

27. SSPC SP6/NACE 3 Commercial Blast Cleaning

28. SSPC SP7 Brush-off Blast Cleaning

29. SSPC SP10/NACE 2 Near White Blast Cleaning

30. SSPC SP11 Power Tool Cleaning to Bare Metal

31. SSPC SP13/NACE 6 Surface Preparation of Concrete

32. SSPC SP15 Commercial-Grade Power Tool Cleaning

33. SSPC Vis1 Pictorial Surface Preparation Standards for Painting Steel Surfaces

34. SSPWC Standard Specifications for Public Works Construction (Greenbook) §210-1 “Paint”

35. SSPWC Standard Specifications for Public Works Construction (Greenbook) §310 “Painting”

1.7 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

MOBILIZATION SUBMITTALS
Applicator’s Quality
Assurance
Submit list of ≥5 completed projects of similar size and complexity.

Include product name and location, name of owner, name of contractor, name of City’s representative, name of coating Manufacturer, approximate area of coatings applied and date of completion
Applicator’s Quality
Assurance for
Submerged or
In addition to above, submit letter from coating system Manufacturer on their stationery stating application Contractor is factory-authorized and trained to apply their product and that coating system Manufacturer will honor specified warranty of DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 583 of 2077 ends

SUBMITTAL DESCRIPTION
Severe-Service
Coating Systems
systems applied by applicator.

Paint, Color, and
Finish Schedule
Submit finish schedule showing the following for each surface type.

1. Surface description

2. Manufacturer of proposed system

3. Proposed Surface preparation

4. Proposed primer product and thickness

5. Proposed intermediate coat and thickness

6. Proposed finish coat and thickness

7. Proposed color

8. Proposed finish (flat, eggshell, satin, semi-gloss or high gloss) Identify proposed exceptions or departures from Contract Documents in submitted finish schedule along with reason for proposed exception or departure (eg Specified product no longer marketed in Southern California.

MANUFACTURER’S LITERATURE
Product Data Submit per Product Data requirements.

Include VOC data.

Application
Instructions
Submit for each paint and coating per Application Instruction requirements.

Include:

1. Surface Preparation Requirements.

2. MSDS sheets identifying flammability, toxicity, allergenic properties and other characteristics requiring field precautions.

3. Safety practices.

4. Minimum and maximum recommended dry-film thicknesses per coat for prime, intermediate, and finish coats.

5. % solids by volume.

6. Recommended thinners.

7. Statement verifying selected prime coat is recommended by Manufacturer for use with selected intermediate and finish coats.

8. Recommended application, equipment, humidity, and temperature limitations.

9. Curing requirements and instructions.

10. Patching, repair, and touch-up instructions.

SAMPLES
Material and Color
Samples
Submit current Manufacturer’s color samples showing full range of available standard colors.

On City’s request, field-apply up to 3 coating samples at no extra cost for review.

City will select colors.

After City-selects color, submit 2 sets of color samples for each color and finish type.

Show color formula on back of each color sample.

Include color samples with formulas in O&M instructions.

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Certificate of
Compliance

1. With each delivery of paint and coating materials, Manufacturer shall certify materials conform to Contract Documents.

2. Submit certification that coatings conform to applicable local Air Quality Management District rules and regulations for products and application

3. Submit coating system and application certification that coatings conform to specified requirements and are suitable for intended application per certificate of compliance requirements.

Inspection Reports 1. Submit inspection reports and data collection sheets for surface preparation and profile checks, coating thickness measurements for each coat, holiday tests, ambient conditions, and other pertinent records.

2. Submit written 3rd-party report from accepted testing agency describing inspections made and actions taken to correct nonconforming Work.

3. Report nonconforming Work not corrected.

CLOSEOUT SUBMITTALS
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 584 of 2077 ends

SUBMITTAL DESCRIPTION
O & M & Cleaning
Instructions
Submit per Operation and Maintenance Instruction requirements.

Warranty Furnish 1-year warranty from date of final acceptance B. Refer to Section 01 33 00 for definition of requirements for Product Data, Application Instructions, O&M Instructions, Certificates of Compliance, and Material Samples.

1.8 Delivery, Storage, and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instructions and warranty requirements for delivery, storage, and handling of painting and coating products.

C. Labels on coating system containers shall show:

1. Coating or material name, formula, or specification number

2. Generic type of material

3. Manufacturer

4. Color name and number

5. Batch or lot number

6. Date of manufacture

7. Shelf-life date

8. Mixing and thinning instructions

9. Hazards connected with use of coating system and precautions, if any, required to prevent injury.

D. Deliver materials to Project Site in original, unopened containers bearing label information specified above.

E. Store paint and coating materials used on job in 1 place designated by City’s Representative.

1. Store materials in clean dry area within temperature range stipulated by Manufacturer.

2. Store paint materials in area ≥50°F

3. Store flammable materials in accordance with local building codes.

4. Separate flammable materials and store in suitable area.

F. Keep containers sealed until ready for use.

1. Do not open or use painting and coating system materials until City’s Representative has inspected containers and has obtained necessary data from information shown on containers and labels.

2. Do not use paint until ≥7 days have elapsed since date of manufacture.

3. Do not use materials beyond Manufacturer’s shelf-life or pot-life limits.

4. Do not use mixed materials beyond pot life limits.

5. Do not apply new coatings to surfaces beyond Manufacturer’s specified recoat limits.

G. Protect materials from damage or contamination.

1. Keep containers closed when not in use.

H. Deliver, store and handle shop-primed steel and shop-coated items as follows:

1. Upon completing blasting and priming, primer on steel shall be cured sufficiently to minimize damage during handling.

2. When transporting structural steel, use spacers and protective devices to eliminate scuffing during unloading.

3. If wood spacers are used, remove wood splinters and particles from shop-primed surfaces after separation.

4. Use padded chains or ribbon binders to secure loaded items and minimize damage to shop-coated surfaces during shipping.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 585 of 2077 ends

5. Handle shop-coated items with care during loading/unloading, installation, and erection to minimize damage.

6. Prevent abrasion damage during loading, unloading, storage and erection. a. Do not slide steel across another plate or member except to fit sheets into position during fabrication.

7. Fully cover shop-primed or shop-coated items with protective coverings or tarpaulins to prevent deposition of road salts, fuel residue, and other contaminants in transit.

8. Do not place or store shop-coated items on ground or on top of other Work unless ground or Work is covered with protective covering or tarpaulin.

9. Steel may be elevated above ground level or other steel members using accepted spacers.

10. Place shop-coated items above ground upon platforms, skids, or other supports.

1.9 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Materials shall be of current manufacture and shall conform to applicable regulations for application and intended service.

1. Materials shall conform to applicable Federal, state and local regulations, including South Coast Air Quality Management District Regulations.

2. Coats of coating systems shall come from 1 Manufacturer and shall be accepted by Manufacturer for intended service.

3. Should product specified herein no longer be manufactured or not meet current regulations, substitute currently manufactured product of at least equal performance meeting applicable regulations subject to City’s Representative’s acceptance, at no additional cost.

B. Materials specified are those that have been evaluated for the specific service.

1. Listed products establish a standard of quality.

2. Standard products of Manufacturers other than those listed will be accepted when it is proved to satisfaction of City’s Representative that they are equal to or better than specified materials in the following properties:
a. Quality
b. Composition
c. Utility
d. Durability
e. Resistance to abrasion and physical damage
f. Life expectancy
g. Ability to recoat in future
h. Solids content by volume
i. Dry film thickness per coat
j. Compatibility with other coatings
k. Suitability for intended service
l. Resistance to chemical attack
m. Temperature limitations in service and during application n. Type and quality of recommended undercoats and topcoats o. Ease and convenience of application
p. Ease and convenience of repairing damaged areas
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 586 of 2077 ends

q. Stability of colors
C. Paints and coatings used on Work shall comply with VOC limits set forth in CALGreen Code §5.504.4.3.

D. Products listed were in general use in 2018.

1. If changes in air quality, water quality or other regulations render listed product obsolete, substitute equivalent product shown in Manufacturer’s literature as being formulated and appropriate for surface to be coated.

E. Factory-applied base coatings to specific products may differ slightly from those listed below where primers are factory-applied by Manufacturers.

F. Base-coat substitutions for convenience of Contractor are subject to the following.

1. Surface preparation shall meet or exceed surface preparations specified below.

2. Primer or base coat shall be that recommended and normally used by Manufacturer for condition and exposure of finished installation.

3. Chemical composition of factory-applied base coats shall be similar to chemical composition specified below.

4. If different coating system is recommended by Manufacturer to meet performance specifications of other sections, Manufacturer shall notify Contractor in writing and said notice shall be forwarded to City’s Representative.

5. Verify compatibility of adjacent coats with coating Manufacturers.

6. If necessary, apply barrier coat between prime coat and subsequent field coats to ensure compatibility.

7. Total DFT shall be ≥ DFT specified.

8. Finish coat shall be as specified.

9. In event of paint system failure, repair paint system in failed area to specifications of this section.

G. Acceptable Manufacturers for pretreatment and shop coats include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Aluminum
Pretreatment
Henkel North America Bonderite C-IC 33 Madison Heights, MI (248) 583-9300 International AWL Grip Alumiprep 33 Amsterdam NED (800) 589-1267 Accepted equal
Steel Pretreatment Henkel North America Galvaprep 5 Madison Heights, MI (248) 583-9300 Accepted equal
Surface Cleaners
and Degreasers
AkzoNobel / Devoe – Devprep 88 Amsterdam NED (800) 589-1267 Carboline Company Surface Cleaner No 3 St Louis, MO (888) 227-2654 Sherwin-Williams Co Clean and Etch Cleveland, OH (800) 524-5979 Ontario, CA (909) 717-3064
Accepted equal

MPI#79 Universal
Shop Primer
AkzoNobel - Ameritone - Devoe - Sinclair - Dulux - Glidden Amsterdam NED (800) 589-1267 Benjamin Moore and Company – Vista Paints Montvale, NJ (201) 573-9600 Carboline Company St Louis, MO (888) 227-2654
Chemcoat
PPG Protective & Marine Coating Amercoat Pittsburgh, PA (412) 434-3131 Yorba Linda CA (714) 777-0300
Primetime Manufacture
Rust-Oleum International LLC / RPM Vernon Hills, IL(877) 385-8155 Sherwin-Williams Company Cleveland, OH (800) 524-5979
Ontario, CA (909) 717-3064
Tnemec Company, Inc. Kansas City, KS (800) 863-6321
Compton, CA (310) 804-2326
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 587 of 2077 ends

H. Acceptable Manufacturers for industrial and architectural applications include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Industrial Coating
Systems
3M Saint Paul, MN (888) 364-3577
AkzoNobel - Ameritone - Devoe - Sinclair - Dulux - Glidden Amsterdam NED (800) 589-1267 Ameron Corrosion Control Division Brea, CA (714) 256-7755 Carboline Company St Louis, MO (888) 227-2654
Dampney Company, Inc. Everett, MA (800) 537-7023
Dudick, Inc., Streetsboro, OH Streetsboro, OH (330) 562-1970 E I DuPont de Nemours & Company Wilmington, DE (302) 774-1000 GET Global Eco Technologies Pittsburg, CA (925) 473-9250 Henkel North America Madison Heights, MI (248) 583-9300 IET Integrated Environmental Technologies Santa Barbara, CA (805) 969-2292 PPG Protective & Marine Coating Amercoat Pittsburgh, PA (412) 434-3131 Yorba Linda CA (714) 777-0300
Rust-Oleum International LLC / RPM Vernon Hills, IL(877) 385-8155 Sanchem, Inc. Chicago, IL (312) 733-6100
Sherwin-Williams Company Cleveland, OH (800) 524-5979
Ontario, CA (909) 717-3064
Superior Environmental Products, Inc. Addison TX (972) 490-0566 Tnemec Company, Inc. Kansas City, KS (800) 863-6321
Compton, CA (310) 804-2326
Wasser Corporation Auburn, WA (800) 627-2968
ZRC Worldwide Marshfield, MA (781) 319-0400
Accepted equal
I. Substitutions will be considered providing the following minimum conditions are met.

1. Request for substitution shall be accepted in writing per Section 01 63 00.

2. Proposed coating system dry film thickness shall equal or exceed specified system thickness.

3. Proposed coating system shall employ an equal or greater number of separate coats.

4. Proposed coating system shall employ coatings or paints of same generic type.

5. Requests for substitution shall include full descriptive literature and required for submittal above including generic coating type, non-volatile content by volume and list of 10 similar projects ≥3 years old where coatings or paints have been applied to similar exposure.

6. City’s Representative may also require submittal of laboratory data sheets certified by independent testing laboratory satisfactory to City’s Representative, showing results of complete spectrographic and durability tests on proposed substitute.

7. City’s Representative shall be sole and final judge of acceptability of substitutions.

J. In addition to requirements stated elsewhere, acceptable manufacturers shall demonstrate ≥10 years’ domestic experience in manufacture of coating systems similar to those furnished.

K. In addition to requirements stated elsewhere, painting, coating, and coating application accessories shall be products of 1 manufacturer.

L. Thinners, cleaners, driers, and additives shall conform to Manufacturer’s application instructions.

2.2 Materials - General
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Surface preparation, prime coatings, and finish coats for various systems are specified herein.

1. Intermediate and finish coats shall be of slightly contrasting shades of specified color.

2. Coating alternates specified shall serve as general guide for type of coating desired.

C. Painting and coating materials shall be specially adapted for use around surface to be coated in its expected environment.

1. Primer coats shall be used as recommended by Manufacturer for these conditions and shall be applied at rates and thicknesses recommended by Manufacturer.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 588 of 2077 ends

D. Materials schedules below list competing products of 2 or 3 manufacturers to establish general standard of quality required.

1. Other listed manufacturers shall furnish products of equivalent chemistry, thickness and product life where their products are not itemized.

E. The following colors are required:

ITEM FINISH COLOR

TREATMENT
PLANTS

FINISH COLOR

PUMPS, WELLS,

AND ENCLOSED
PIPING

FINISH COLOR (AT
GRADE or EXPOSED)

RECYCLED WATER SYSTEM IMPROVEMENTS
Air and Vacuum Relief Valve Assemblies Brown Purple Purple Air and Vacuum Relief Valve Covers Purple Purple
Piping Brown Purple Purple
Pressure Vessels Brown Purple Purple
Pump and Pump Bases (excluding motor) Brown Purple Purple Valves (all types) Brown Purple Purple
Valve Can Lids Purple Purple Purple
Vault Hatch Lids Factory Finish Factory Finish Factory Finish Fire Hydrants Purple Purple

SITE AND BUILDING IMPROVEMENTS
Safety Markings Safety Yellow Safety Yellow Safety Yellow Electrical Equipment, Controls, Panels ANSI safety white ANSI safety white ANSI safety white Electrical Motors (Do not field coat) ANSI 61 light grey ANSI 61 light grey ANSI 61 light grey Instruments ANSI 61 light grey ANSI 61 light grey ANSI 61 light grey Plant Process Wastewater Piping Refer to Section
01 73 33
Refer to Section 01 73
33 Refer to Section 01 73
33 Other Plant Piping Refer to Section
01 73 33
Refer to Section 01 73
33 Refer to Section 01 73
33 Valve Interiors White White White
F. Color definitions shall be as follows:

COLOR PANTONE ID #
(CLOSEST MATCH

IN SUNLIGHT)

COMMERCIAL COLOR NAME
PPG/PMC Sherwin Williams Tnemec
ANSI Safety Green Pantone 335C Safety Green4085 -
384U
ANSI Safety Red Pantone186C Safety Red 4081 -
485C 2X
ANSI Safety
Orange
Pantone151C Safety Orange 4083 -
021C
ANSI Safety Yellow Pantone109C Flirtatious 1212-7 Safety Yellow 4084 - U2X
89HT
ANSI Safety Purple Pantone 259C
ANSI Safety White White High-Reflective White
7757
White 00WH
ANSI Safety Gray
ANSI Safety Brown
ANSI Safety Blue Pantone 285C
ANSI 24 Gray ANSI 24
ANSI 33 Gray ANSI 33
ANSI 45 Gray ANSI 45
ANSI 49 Medium
Light Gray
ANSI 49
ANSI 61 Light Gray ANSI 61
Flint Gray Flint Gray 4019
Light Blue Pantone 2925C
Dark Blue Pantone 2766C Blue Tang 1160-7 Honorable Blue 6811 Old Glory Blue 78BL Purple Pantone 512C
Reclaimed Water
Purple
Pantone 522 Grape Arbor 1247-5 Berry Frappé 9068 Reclaimed Water Purple 16SF
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 589 of 2077 ends

Green Royal Hunter Green
1133-7
Derbyshire 6741 Garden 35GN
Olive-lite Pantone 451C
Safety Orange Field Poppy 1195-7 Invigorate 6886 79HT
Safety Red Rum Punch 1190-7 Positive Red 6871 69HT
Desert Sand Desert Camel 12-16 Ligonier Tan 7717 Desert Sands 04BR Brown Fudge 1073-7 Rugged Brown 6062 Safety Brown 15SF
G. Color trade names are provided for reference and do not indicate preference for Manufacturer.

1. Alternative Manufacturers may be furnished, provided colors can be matched H. Final colors will be selected by City from submitted color samples.

I. Color pigments shall be pure, non-fading, types to suit substrates and intended service shown.

1. Lead content shall not exceed amounts permitted by federal, state and local government regulations.

2. Paints applied to submerged concrete or metal contacting potable water shall be approved by the California State Department of Health Services

2.3 Materials – Painting and Coating of Valves, Pumps, Flow Meters, Pipe Supports, Exposed Piping, and Pipeline Appurtenances
A. Coating shall occur as follows:

1. Shop prime exteriors at place of manufacture.

2. Prepare the following surfaces to conform to SSPC-SP6/NACE3 “Commercial Blast Cleaning” before shop priming:
a. Exterior items
b. Items to receive zinc-rich primer
c. Items to receive high-performance coatings

3. Prepare other surfaces to conform to SSPC-SP3 “Power Tool Cleaning” before shop priming.

4. Shop prime to conform to applicable sections of SSPC PA1 “Shop, Field and Maintenance Painting”

5. Coat buried metal valves, above ground metal valves, flow meters, and pumps at place of manufacture unless otherwise directed.

6. Apply other primer, intermediate, and finish coats to exterior of pipe supports, exposed piping, and pipeline appurtenances in field unless otherwise directed.

7. Finish coat on exposed pipe, valves, and appurtenances shall match color and sheen of adjacent piping.
a. Where factory coat does not match color and sheen of adjacent piping, apply additional finish coat to match adjacent piping.

8. Coat hand-wheels, pipe supports, and floor stands same as valves.

9. For pipe areas employing grooved or shouldered couplings, limit coating thickness in groove or shoulder area to ≤10 mils.

B. Coat non-buried piping and piping appurtenance exteriors with this coating system:

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Valve, Pump, ,
Flow Meter, Pipe
Support, Piping, or
Pipeline
Appurtenance
Exterior Coating
Polyamidoamine
Epoxy / Aliphatic
Acrylic Urethane
Total DFT 8.0-15.0 mils
Surface
Preparation
SSPC-SP6/NACE 3 Commercial blast cleaning

1.5-3.0-mil surface angular blast anchor profile
Base Coat (ShopApplied) Polyamidomine
Epoxy
Tnemec Sherwin Williams
Macropoxy 646-100

PPG/PMC
Amerlock 2 VOC
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 590 of 2077 ends

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Series L69
Epoxoline
DFT 3.0-5.0 mils
DFT 3.0-5.0 mils DFT 3.0-5.0 mils
Intermediate Coat Polyamidomine
Epoxy
Tnemec
Series L69
Epoxoline
DFT 3.0-5.0 mils
Sherwin Williams
Macropoxy 646-100
DFT 3.0-5.0 mils

PPG/PMC
Amerlock 2 VOC
DFT 3.0-5.0 mils
Finish Coat Aliphatic or Acrylic
Urethane or
Polysiloxane
Tnemec
Endura-Shield II
Series 1095
DFT 2.0-3.0 mils
Sherwin Williams
Sher-Loxane-800
DFT 2.0-4.0 mils

PPG/PMC
Amershield VOC
Polyurethane
DFT 2.0-4.0 mils
C. Coating systems for buried valve, flow meter, pipeline and pipeline appurtenance exteriors shall meet requirements for buried metal specified elsewhere in this section.

D. Apply interior lining of valves 3” and larger as follows:

1. Coat interior metal surfaces excluding seating areas and bronze and stainless-steel pieces.
a. Remove protuberances which may produce pinholes in lining. b. Round sharp edges to be coated.
c. Remove contaminants which may prevent bonding of lining.

E. Apply interior lining of valves 3” and larger per AWWA C550.

2.4 Metal, Interior and Exterior, Normal Exposure
A. Coat exposed non-galvanized steelwork, non-galvanized handrails, exposed pipework, fittings, mechanical equipment, pumps, machinery, doors, door frames and window sash with this coating system.

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Coating for NormalExposure Steel
Polyamidoamine
Epoxy / Aliphatic
Acrylic Urethane
Total DFT 8.0-15.0 mils
Surface
Preparation
SSPC-SP6/NACE 3 Commercial blast cleaning

1.5-3.0-mil surface angular blast anchor profile
(Where blast cleaning is not possible, provide SSPC SP-15 CommercialGrade Power Tool cleaning.) Base Coat (ShopApplied) Polyamidoamine
Epoxy
Tnemec
Series L69 Epoxoline
DFT 3.0-5.0 mils
Sherwin Williams
Macropoxy 646-100
DFT 3.0-5.0 mils

PPG/PMC
Amerlock 2 VOC
DFT 3.0-5.0 mils
Intermediate Coat
(Field-Applied)
Polyamidomine
Epoxy
Tnemec
Series L69 Epoxoline
DFT 3.0-5.0 mils
Sherwin Williams
Macropoxy 646-100
DFT 3.0-5.0 mils

PPG/PMC
Amerlock 2 VOC
DFT 3.0-5.0 mils
Finish Coat (FieldApplied) Aliphatic or Acrylic
Urethane or
Polysiloxane
Tnemec
Endura-Shield II
Series 1095
DFT 2.0-3.0 mils
Sherwin Williams
Sher-Loxane-800
DFT 2.0-4.0 mils

PPG/PMC
Amershield VOC
Polyurethane
DFT 2.0-4.0 mils
B. Metalwork previously given shop prime coat accepted by City's Representative shall be touched up as required in field with Tnemec Series 27 WB Typoxy or equal.

2.5 Metal, Severe Exposure to Moisture or Chemical Fumes A. Coat exterior non-submerged metal with severe exposure to moisture or chemical fumes with this coating system.

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Coating for Metal
Exposed to
Moisture or
Chemical Fumes
Aromatic Urethane
Zinc-Rich Primer /
Modified Polyamine
Total DFT 8.5-14.5 mils
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 591 of 2077 ends

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Epoxy / Aliphatic
Acrylic Urethane
Surface
Preparation
SSPC-SP10/NACE 2 Near-white metal blast cleaning

2.0-3.0-mil surface angular blast anchor profile
Base Coat Aromatic Urethane
Zinc Rich Primer
Tnemec
Series 94 H2O
Tneme-zinc
DFT 2.5-3.5 mils
Gray Green
Sherwin Williams
Corethane Galvapac
2K100
DFT 2.5-3.5 mils
Gray Green

PPG/PMC
Dimetcote 21-5
DFT 2.0-5.0 mils
Gray
Intermediate Coat Modified Polyamine
Epoxy
Tnemec
Series L69 Epoxy
DFT 4.0-5.0 mils,
Sherwin Williams
Macropoxy 646-100
DFT 4.0-6.0 mils

PPG/PMC
Amerlock 2VOC
DFT 4.0-6.0 mils
Finish Coat Aliphatic or Acrylic
Urethane or
Polysiloxane
Tnemec
Series 1095

2.0-3.0 mils DFT
Sherwin Williams
Sher-Loxane-800
DFT 2.0-4.0 mils

PPG/PMC
Amershield VOC
Polyurethane
DFT 2.0-4.0 mils
B. Coat interior non-submerged metal with severe exposure to hydrogen sulfide fumes with this coating system.

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Coating for Interior
Metal Exposed to
High Hydrogen
sulfide fumes
Modified Polyamine
Epoxy
Total DFT 30.0-40.0 mils
Surface
Preparation
SSPC-SP10/NACE 2 Near-white metal blast cleaning
≥3.0-mil surface angular blast anchor profile
Base Coat Modified Polyamine
Epoxy
Tnemec
Series 435 Perma
Shield
DFT 15-20 mils
Sherwin Williams
Duraplate 6100
DFT: 15-20 mils

PPG/PMC
Novaguard 810
Phenolic novolac epoxy
DFT 15-20 mils
Finish Coat Modified Polyamine
Epoxy
Tnemec
Series 435 Perma
Shield
DFT 15-20 mils
Sherwin Williams
Duraplate 6100
DFT: 15-20 mils

PPG/PMC
Novaguard 810
Phenolic novolac epoxy
DFT 15-20 mils

2.6 Nonferrous Metal, Galvanized Steel, Stainless Steel, Aluminum, Copper, or Brass A. Copper, bronze, chromium plate, nickel, stainless steel, aluminum, nonferrous, and factoryfinished materials and surfaces shall not be painted except as otherwise specified.

1. Nameplates painted over shall be replaced in kind.

2. Grease fittings painted over shall be replaced in kind.

3. Galvanized finish will not be considered factory finish.

B. Coat aluminum embedded in or in contact with concrete to prevent electrolysis.

C. Coat galvanized metal, aluminum, copper or brass with this coating system where coating is required.

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Coating for
Galvanized Metal,
Aluminum, Copper
or Brass
Hydrophobic
Acrylic Primer /
HDP Acrylic
Polymer Finish
Total DFT 4.0-10.0 mils
Surface Preparation SSPC-SP1 Solvent Cleaning followed by SSPC-SP2 Hand Tool Cleaning
Prepare and scarify galvanized surfaces in accordance with ASTM D6386 Base Coat Etch Chemically etch in
accordance with
Tnemec Technical
Memo #10-78 and in
Chemically etch in
accordance with
Manufacturer’s
recommendations
Prepare surface in
accordance with
Manufacturer’s
recommendations
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 592 of 2077 ends

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
accordance with
ASTM D6386

Intermediate Coat Hydrophobic
Acrylic
Tnemec
Series V115 Uni Bond
DF
DFT 2.0-3.0 mils
Sherwin Williams
Macropoxy 646-100
DFT 3.0-5.0 mils

PPG/PMC
Amerlock 2VOC
DFT 3.0-5.0 mils
Finish Coat HDP Acrylic
Polymer or
Polysiloxane
Tnemec
Series 1029
Enduratone
DFT 2.0-3.0 mils
Sherwin Williams
Sher-Loxane-800
DFT 2.0-4.0 mils

PPG/PMC
Amershield VOC
DFT 2.0-4.0 mils

2.7 Metal, Buried
A. Coat buried metal which includes valves, bolts, nuts, structural steel and fittings with this system.

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Coating for Buried
Metal
Hybrid Inorganic
Water-Based
Epoxy
Total DFT 12.0-24.0
mils
Total DFT 16.0-24.0
mils
Total DFT 16.0-24.0
mils
Surface Preparation SSPC-SP6/NACE 3 Commercial blast cleaning

1.5-3.0-mil surface angular blast anchor profile
≥1.5-mil surface angular blast anchor profile
Base Coat Hybrid Inorganic
Water-Based
Epoxy
Tnemec
Series 27 WB Typoxy
DFT 6.0-12.0 mils
Sherwin Williams
Sherglass FF Low
VOC
DFT: 8.0-12.0 mils

PPG/PMC
Amerlock 2VOC
DFT 8.0-12.0 mils
Finish Coat Hybrid Inorganic
Water-Based
Epoxy
Tnemec
Series 27 WB Typoxy
DFT 6.0-12.0 mils
Sherwin Williams
Sherglass FF Low
VOC
DFT: 8.0-12.0 mils

PPG/PMC
Amerlock 2VOC
DFT 8.0-12.0 mils

2.8 Materials – Painting and Coating of PVC, CPVC and FRP A. Coat PVC, CPVC and FRP items with this system.

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
PVC, CPVC and
FRP pipe
Modified
Polyamine Epoxy
/ Pigmented
Aliphatic Acrylic
Urethane
Total DFT 4.0-8.0 mils
Surface Preparation SSPC-SP1 Solvent cleaning followed by thorough and uniform abrasion with medium grain sandpaper
Base Coat Modified
Polyamine Epoxy
Tnemec
Series L69 Epoxy
DFT 2.0-3.0 mils
Sherwin Williams
Macropoxy 646-100
DFT 2.0-3.0 mils

PPG/PMC
Amerlock 2VOC
DFT 2.0-4.0 mils
Finish Coat Pigmented
Aliphatic Acrylic
Urethane or
Polysiloxane
Tnemec
Endura-Shield II
Series 1095
DFT 2.0-3.0 mils,
Sherwin Williams
Sher-Loxane-800
DFT 2.0-4.0 mils

PPG/PMC
Amershield VOC
Polyurethane
DFT 2.0-4.0 mils
B. Coat PVC, CPVC and FRP where such pipe is above grade and exposed to sunlight, or where required in vaults and buildings for color coding of pipes, or to match adjacent finishes.

2.9 Masonry, Exterior, Normal Exposure
A. Where Contract Documents require masonry to be painted, paint exterior masonry surfaces subject to normal exposure with this system.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 593 of 2077 ends

ITEM MATERIAL SPECIFICATION

ALTERNATE

SPECIFICATION

ALTERNATE

SPECIFICATION
Coating for Exterior
Masonry Surfaces
Modified
Waterborne
Acrylate
Total DFT 8.0-16.0 mils
Surface Preparation Remove dirt, dust, grease, laitance or other deleterious matter.

Filler Filler Fill cracks and voids with suitable caulking material compatible with specified coating.

Base Coat Modified
Waterborne
Acrylate
Tnemec
Series 156
Envirocrete
DFT 4.0-8.0 mils
Sherwin Williams
Loxon Block Surfacer
DFT 8.0–12.0 mils
PPG Paints
Perma-Crete 4-100
DFT 9.3 – 11.6 mils
Finish Coat Modified
Waterborne
Acrylate
Tnemec
Series 156
Envirocrete
DFT 4.0-8.0 mils
Sherwin Williams Pro
Industrial Acrylic
DFT 2.0–4.0 mils
PPG Paints
Pitt-Tech Plus
DFT 2.0 – 4.0 mils
PART 3 - EXECUTION

3.1 Preparation
A. Pre-application meeting shall be held 1 to 2 weeks before start of coating system application for products covering > 100 ft2.

1. Meeting shall be attended by Contractor, applicator, Manufacturer’s representative and City’s Representative and shall cover:
a. Environmental requirements set by Manufacturer for their product b. Protection of surfaces not scheduled to be coated
c. Stormwater pollution prevention requirements
d. Surface preparation
e. Application
f. Repair
g. Field quality control
h. Dust control
i. Cleaning
j. Protection of coating systems
k. 11-month inspection
l. Coordination with other work
B. Notify City’s Representative ≥3 days before start of field surface preparation Work.

C. Surfaces to be coated or painted shall be in proper condition to receive material specified before coating or painting is done.

1. Do not apply painting materials to wet, damp, dusty, dirty, fingermarked, rough, unfinished, or defective surfaces.

2. Prepare concrete, iron, steel, and wood surfaces in accordance with applicable Manufacturer’s instructions and SSPC standards.

D. Solvent cleaning shall conform to SSPC SP1 and the following:

1. Oil, grease, soil, drawing and cutting compounds, contaminants, and salts shall be removed by solvent cleaning, emulsions, cleaning compounds, steam cleaning, or other methods which may not involve solvent action before hand cleaning or power tool cleaning.

2. Cleaning with solutions of alkaline cleaners shall be followed by fresh-water rinse. a. When recommended by paint Manufacturer or specified, follow fresh-water rinse with passivating dichromate or dilute chromic acid wash.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 594 of 2077 ends

3. Remove oil or grease by 1 of the following methods:
a. Wiping or scrubbing surface with rags or brushes wetted with solvent. b. (Final wiping shall use clean solvent and clean rags or brushes.) c. Spraying surface with solvent.
d. (Final spraying shall use clean solvent.)
e. Complete immersion in tank or tanks of solvent.
f. (Solvent for last immersion shall not contain detrimental amounts of contaminant.) g. Emulsion cleaners may be used provided surface treated is subsequently washed to remove detrimental residues.
h. Steam cleaning may be used, using detergents or cleaners provided surface is steamed or washed to remove detrimental residues.

4. If chemical paint strippers are used to remove paint, use suitable solvent to remove wax from stripper remaining on surface.
a. Remove alkaline residues from paint strippers by washing surface with fresh water. b. Remove all detrimental paint residue or stripping agent.

5. Regardless of solvent-cleaning method, no detrimental residue shall remain following cleaning.

E. Hand cleaning shall conform to SSPC SP2 and the following:

1. Remove loose mill scale, loose rust, dirt, and loose or non-adherent paint by hand brushing, hand sanding, hand scraping, hand chipping, hand impact tools, or combination of these methods.
a. Although not all mill scale, rust, and paint need be removed, loose mill scale, rust, paint and other detrimental foreign matter shall be removed. b. Remove stratified rust (rust scale) by hand hammering, hand chipping, hand impact tools or combination of these methods.
c. Remove loose mill scale and loose or non-adherent rust by hand wire brushing, hand sanding, hand scraping, or combination of these methods.

2. Rust and mill scale are classified as “loose mill scale” and “loose or non-adherent rust” if they can be removed from steel surface by vigorous hand brushing with new, commercially available wire brush of suitable type at rate of 2 ft2
per minute.
a. This test shall be conducted on area not previously brushed, scraped, or sanded, but from which all detrimental stratified rust (rust scale), oil, and grease (if present) have been removed.
b. This test establishes standard for surface preparation and shall and shall not be considered as establishing production rate by cleaning. c. Regardless of methods used for cleaning, clean surface at least as well as surface resulting from this test.

3. Operate hand tools in such manner no burrs or sharp edges are left on surface and no sharp cuts are made into steel.

4. After removing loose or non-adherent paint, feather edges of remaining old paint so repainted surface will have smooth appearance.
a. Remaining old paint shall have sufficient adhesion so it cannot be lifted as layer by inserting blade of putty knife beneath it.

5. Remove accessible weld flux and spatter by hand scraping or hand impact tools, followed by wire brushing.

6. Clean accessible portions of all partially enclosed steel members. a. Before assembly, clean new Work areas which will be inaccessible after assembly.

7. Properly clean rivets, welds, corners, joints, and openings.

8. After completing hand cleaning, remove dust and other loose matter from surface.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 595 of 2077 ends

a. If detrimental amounts of grease or oil are still present, spot clean these areas with solvent.

F. Power-tool cleaning shall conform to SSPC SP3 and the following:

1. Remove loose mill scale, loose rust, and loose paint with power wire brushes, power impact tools, power grinders, power sanders, or combination of these methods. a. Although not all mill scale, rust, and paint need be removed, loose mill scale, rust, paint and other detrimental foreign matter shall be removed. b. Remove stratified rust (rust scale) by power impact tools or, if minor quantities are present, by hand.
c. Large areas of tight or well-adhered paint, even if removable, shall only be removed where specified.

2. Acceptable power-tool cleaning methods include:
a. Power wire brushing, using rotary, radial, or cup brushes of suitable size, entering all accessible openings, angles, joints, and corners.
b. (Steel wire of such brushes shall have sufficient rigidity to clean surface, shall be kept free of excess foreign matter, and shall be discarded when no longer effective. c. (Clean surface, but do not burnish to detrimental degree.) d. Power impact tool cleaning, using power-driven chipping or scaling hammers, rotary scalers, single- or multiple-piston scalers, or similar impact cleaning tools. e. (Maintain cutting edges of such tools in effective condition.) f. Power grinding, using abrasive wheels or power sanding using abrasive materials. g. (Discard sanding or abrasive materials when they become ineffective.)

3. Rust and mill scale are classified as “loose mill scale,” “loose or non-adherent rust,” and “loose or removable paint,” if they can be removed from steel surface by power wire brushing using commercial electric or air wire-brushing machine operated at speed under load of 3,450 rpm and equipped with 6” diameter cup brush of double-row, knotted construction, made of No.20-gage music wire.
a. Hold brush against steel surface with force of 16 lbf. b. Rate of cleaning shall be ≥ 2 ft2
per minute
c. This test shall be conducted on area not previously brushed, scraped, or sanded, but from which all detrimental stratified rust (rust scale), oil, and grease (if present) have been removed.
d. This test establishes standard for surface preparation and shall and shall not be considered as establishing production rate by cleaning. e. Clean surface at least as well as surface resulting from this test.

4. After removing loose or non-adherent paint, feather edges of remaining old paint so repainted surface will have smooth appearance.
a. Remaining old paint shall have sufficient adhesion so it cannot be lifted as layer by inserting blade of putty knife beneath it.

5. Remove accessible weld flux and spatter by hand scraping or hand impact tools, followed by wire brushing.

6. Clean accessible portions of all partially enclosed steel members. a. Before assembly, clean new Work areas which will be inaccessible after assembly.

7. Properly clean rivets, welds, corners, joints, and openings, using power wire brushing, sharp chisels used in chipping, scaling hammers, rotary grinders, sanders, or combination of these methods.

8. After completing hand cleaning, remove dust and other loose matter from surface. a. If detrimental amounts of grease or oil are still present, spot clean these areas with solvent.

G. Power-tool cleaning to bare metal, where specified, shall conform to SSPC SP11.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 596 of 2077 ends

H. Abrasive blast cleaning (sandblasting) shall be completed as follows:

1. Abrasive blast cleaning is defined as removing mill scale, rust, rust scale, oxide, paint, contamination, and foreign matter from surfaces, using fine abrasives, such as siliceous or mineral abrasives, 80 to 100 mesh propelled through nozzles or centrifugal wheels..

2. Metal surface may be cleaned by 1 of the following methods:
a. Dry sandblasting, using compressed air blast nozzles and dry sand of particle size no larger than that passing #18 mesh screen, US sieve series. b. Wet or water vapor sandblasting, using compressed air blast nozzles, water, and sand of particle size no larger than that passing #18 mesh screen, US sieve series. c. Grit blasting using compressed air blast nozzles and crushed grit made of cast iron, malleable iron, steel, or synthetic grits other than sand. d. (Largest commercial grade of metal grit permitted shall be SAE Grit #G25 abrasive material.)
e. Shot blasting, using compressed air nozzles and cast iron, malleable iron, steel, or synthetic shot.
f. (Largest commercial grade shot permitted shall be SAE Shot #S330.) g. Closed, re-circulating nozzle blasting using compressed air, vacuum, and any of the preceding abrasives,
h. Grit blasting using centrifugal wheels and crushed grit made of cast iron, malleable iron, steel, or synthetic grits.
i. (Largest commercial grade grit permitted shall be SAE Shot #330.)

3. Compressed air used for nozzle blasting shall be free of detrimental amounts of condensed water, or oil.
a. Provide adequate separators or traps.

4. Do not use abrasives that have become contaminated in automatic equipment. a. When shop or field blast cleaning with handheld nozzles, do not recycle or reuse blast particles.
b. Abrasives used in blast cleaning shall be new, washed, graded and free of contaminants which might interfere with adhesion of coatings and paints. c. Do not reuse abrasive unless accepted by City’s Representative. d. Particle size of abrasives used in blast cleaning shall produce specified surface profile in per recommendations of Manufacturer of paint or coating system, subject to acceptance by City’s Representative.

5. Implement debris containment systems for surfaces subject to abrasive blast cleaning, regardless of whether LBP/LCP materials are present.
a. Mask openings in motors and machinery to prevent paint and abrasive materials from entering.
b. Place drop cloths or apply masking tape where required to prevent spatter, dripping and overspray from contact with floors, surfaces and equipment not scheduled to receive paint or coatings.
c. Protect surrounding areas and surfaces not scheduled to be blasted and/or coated from damage or coloration during surface preparation and coating application. d. Perform blast cleaning operations in manner such that no damage is done to partially or fully completed Work.

6. Remove weld spatter, sharp edges, burrs, and weld slag from metal surfaces. a. Grind smooth rough welds, beads, peaked corners, sharp edges, erection lugs and protrusions in accordance with SSPC SP-2 and SSPC SP-3. b. Neutralize welds with chemical solvent compatible with specified coating materials. c. Use clean cloths and chemical solvent.
d. Wipe dry with clean cloths.
e. Do not leave residue on cleaned surfaces.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 597 of 2077 ends

7. Remove oil and grease from metal surfaces in accordance with SSPC SP-1. a. Use clean cloths and cleaning solvents and wipe dry with clean cloths. b. Do not leave film or greasy residue on cleaned surfaces before sandblasting.

8. Do not sandblast or prepare more surface than can be coated or painted in same working day.
a. Sandblasting shall be done not more than 8 hours ahead of painting, subject to humidity and weather conditions between time of sandblasting and painting operations.

9. Complete abrasive blast cleaning using dry or water vapor methods unless otherwise directed.
a. Maintain dust emissions within legal levels and within levels which will not create nuisance.

10. Equip abrasive blasting nozzles with “deadman” emergency shutoff nozzles. a. Blast nozzle pressure shall be ≥95 psi and shall be verified using accepted nozzle pressure gauge at each start-up period or as directed by City’s Representative. b. Nozzles used during blast cleaning operations shall be sufficient to ensure timely completion of Work on schedule.

11. Blast cleaning from rolling scaffolds shall only be done within confines of interior perimeter of scaffold.
a. Reaching beyond limits of perimeter will be allowed only if blast nozzle is maintained in position which will produce profile acceptable to City’s Representative.

12. Keep Work areas clean, and do not allow blasting particles to accumulate and constitute nuisance or hazard.
a. Remove spent abrasives and other debris at Contractor’s expense. b. If waste is determined to be hazardous, dispose of waste as required by law.

13. During abrasive blast cleaning, prevent damage to adjacent coatings. a. Schedule blast cleaning and coating such that dust, dirt, blast particles, old coatings, rust, or mill scale will not damage or fall upon wet or newly coated surfaces.

14. After blast cleaning and prior to applying coating, dry clean substrates by dusting, sweeping, and vacuuming to remove residue from blasting.

15. If rusting or discoloration of sandblasted surfaces occurs before painting, remove such rusting or discoloration by additional sandblasting.

16. Clean dry sandblasted and coated/painted surfaces before applying paint or coating systems by combination of blowing with clean dry air, brushing/brooming with clean brushes of hair, bristle, or fiber, and/or vacuuming as directed by City’s Representative. a. Air hose for blowing shall be ≥½” diameter and equipped with shut-off device. b. Remove loose traces of blast products from surface, and remove abrasive from pockets and corners.

17. Clean wet sandblasted surfaces before applying paint or coating systems by rinsing with fresh water to which sufficient corrosion inhibitor has been added to prevent rusting, or with fresh water followed immediately by inhibition treatment. a. Supplement cleaning by brushing or vacuuming to remove residues.

18. Sandblasted surfaces shall not be left overnight before painting.

19. Coat abrasive blast-cleaned surfaces with primer before visible rust forms on surface. a. Do not leave blast-cleaned surfaces uncoated for > 8 hours. b. Cleaned areas not receiving base coat within 8-hour period shall be recleaned prior to application of base coat.

I. White metal blast cleaning shall conform to SSPC SP5/NACE 1, and the following:

1. White metal blast-cleaned surface is defined as surface with gray-white, uniform metallic color, slightly roughened to form suitable anchor pattern for coatings.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 598 of 2077 ends

a. Surface when viewed without magnification shall be free from oil, grease, dirt, visible mill scale, rust, corrosion products, oxides, paint or foreign matter. b. Color of clean surface may be affected by abrasive medium used.

J. Near-white metal blast cleaning shall conform to SSPC SP10/NACE 2, and the following:

1. Near-white blast-cleaned surface is defined as 1 from which all oil, grease, dirt, mill scale, rust, corrosion products, oxides, paint, or foreign matter have been removed from surface except for very light shadows, very light streaks, or slight discoloration caused by rust, stain, mill scale, oxides, or slight, tight residues of paint or coating that may remain. a. At least 95% of each square inch of surface shall be free of visible residues, and remainder shall be limited to light discoloration mentioned above.

K. Commercial blast cleaning shall conform to SSPC SP6/NACE 3, and the following:

1. Commercial blast-cleaned surface is defined as 1 from which all oil, grease, dirt, rust scale, and foreign matter have been removed from surface and rust, mill scale, and old paint have been removed except for slight shadows, streaks, or discoloration caused by rust, stain, mill scale, oxides, or slight, tight residues of paint or coating that may remain. a. If surface is pitted, slight residues of rust or paint may be found in bottom of pits. b. At least ⅔ of every square inch of surface area shall be free of visible residues, and remainder shall be limited to light discoloration, slight staining or light residues mentioned above.

L. Brush-off blast cleaning shall conform to SSPC SP7, and the following:

1. Brush-off blast cleaned surface is defined as 1 from which all oil, grease, dirt, rust scale, loose mill scale, loose rust, and loose paint or coatings are removed, but tight mill scale and tight-adhered rust, paint, and coating are permitted to remain provided all mill scale and rust have been exposed to abrasive blast pattern sufficient to expose numerous flecks of underlying metal fairly uniformly distributed over entire surface. a. Heavy oil and grease deposits shall be removed by solvent cleaning. b. Small quantities of oil or grease may be removed by blast cleaning. c. Excessive rust scale shall be removed by impact tools and hand cleaning.

M. Prepare galvanized surfaces as follows:

1. Hand clean to remove concrete spatter, heavy grease, and foreign matter by hand scraping or wire brushing.

2. After hand cleaning, clean galvanized surfaces by solvent cleaning to remove oil, grease, and detrimental foreign matter.

3. After washing, roughen areas by abrasive blasting using abrasive no larger than #30 mesh.

4. Abrasive blasting shall not remove galvanizing.

N. Prepare wood surfaces as follows:

1. Remove cracked or peeled paint, loose chalky paint, dirt, and foreign matter by wire brushing, scraping, sanding, or other accepted means immediately prior to painting.

2. Wipe or dry brush surfaces to remove dust or chalky residue remaining from cleaning.

3. Allow wood surface to dry before painting.

O. Before application, examine areas and conditions under which coating systems are to be applied.

1. Concrete and masonry surfaces shall cure 30 days prior to coating or painting.

2. Ensure surfaces to receive coatings are dry and free from visible oil, grease, dirt, dust, laitance, mill scale, rust, paint oxides, corrosion products, blisters, loose paint, moisture, and other foreign matter in accordance with specified SSPC standards.

3. Neutralize spots showing effects of alkali.

4. Neutralize welds with suitable chemical compatible with specified paint or coating system.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 599 of 2077 ends

5. Notify City’s Representative of areas or conditions which are not acceptable to receive coatings.
a. Do not begin surface preparation or application until unacceptable areas or conditions have been corrected.

P. Prior to application of paint or coating, notify City’s Representative to inspect and accept prepared surfaces to receive paint or coating.

1. Surface preparation inspection for metals shall be based on comparison with SSPC-Vis1 “Surface Preparation Standards for Painting Steel Surfaces”

2. Prepare and submit report of surface preparation inspections. a. Failure to provide inspections and reports shall be cause for rejection of applied coating if there is reasonable doubt, as determined solely by City’s Representative, that specified surface preparation or paint application procedures were not followed.

Q. Touch up shop-primed surfaces to cover scratches or abraded areas, using primer similar to and compatible with shop-primer and specified finish coat.

R. Using brush, stripe paint critical locations such as welds, corners, edges, roof lap seams, nuts, bolts, ends, rafter flanges and other areas identified by City’s Representative using specified primer.

S. Where surfaces are joined so closely that proper surface preparation and paint application is not possible, prepare and paint such surfaces prior to assembly or installation.

3.2 Application
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install paint and coating systems at locations shown on Plans and Submittals.

C. Unless otherwise specified, ferrous surfaces except for stainless steel or galvanized iron or steel surfaces shall be painted or coated, including top surfaces of steel roof support framing and underside of steel roof plates bearing on roof supports.

D. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. SSPC PA3 Guide to Safety in Paint Application

3. NACE 6D-173 Manual for Painter Safety

4. Applicable building, fire, plumbing, mechanical and electrical code requirements

5. Manufacturer’s installation and warranty requirements

6. SSPC-PA1 “Shop, Field and Maintenance Painting
E. Refer variances between above documents and Contract Documents to City’s Representative.

F. Do not apply coatings when environmental conditions are not appropriate or jeopardize appearance or quality of coating.

1. This includes but is not limited to the following unsatisfactory environmental conditions. a. When air temperature is <50°F or >125°F or is outside limits recommended by Manufacturer for satisfactory application.
b. When it is expected air temperature will drop to <40°F or rise to >125°F within 8 hours after application of coating.
c. When surface temperature is <5°F (3°C) above dew point or is outside limits recommended by Manufacturer for satisfactory application. d. When relative humidity is outside limits recommended by Manufacturer for satisfactory application.
e. When surfaces are exposed to fog or condensation.
f. During precipitation including rain, sleet, snow, fog or mist.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 600 of 2077 ends

g. When wind velocity is outside limits recommended by Manufacturer for satisfactory application.
h. In dust or smoke-laden atmospheres.
i. When above conditions are prevalent, postpone paint or coating application until conditions are favorable.
j. Complete daily paint or coating application in time to permit film sufficient drying and curing time before damage by atmospheric conditions.

G. Mixing shall be done as follows:

1. Mixing shall occur in enclosed areas designated by City’s Representative where materials are protected from direct sunlight, inclement weather, or freezing.

2. Protect surfaces of City’s paving, structures, and improvements from material spillage within mixing area.

3. Remove surface film, and if necessary, strain paint material before mixing.

4. Mix thoroughly using slow-speed power mixer until components are thoroughly combined and are of smooth consistency.
a. Use exact proportions specified by Manufacturer.
b. Mix only components specified and furnished by Manufacturer. c. Do not intermix additional components for reasons of color or otherwise, even within same generic type of coating.
d. Exercise care to ensure all material is removed from containers during mixing and metering.
e. Do not use partial batches.

5. Do not use multiple-component coatings that have been mixed beyond their pot life.

6. Provide small quantity kits for touch-up painting and for painting other small areas.

7. When power mixing multiple components, do not introduce moisture or air into product.

8. Do not dispose of coating and coating-system washdown materials using floor drains, dikes, channels, or storm drains.

H. Thinning shall only be permitted within limits set by applicable regulatory agencies and as permitted by Manufacturer and accepted by City’s Representative.

1. Perform thinning in presence of City’s Representative.

2. If thinning is accepted, do not exceed maximum allowable amount of thinner per gallon of coating material.

3. Stir coating materials when adding thinner.

4. Do not flood coating material surface with thinner prior to mixing.

5. Do not reduce coating materials more than necessary to obtain proper application characteristics and to obtain specified dry-film thicknesses.

6. If paint becomes thick in cool weather, it may be heated by immersing container in hot water.

I. Coating applications shall conform to the following:

1. Painting of structures shall occur after erection or assembly. a. Requests to do painting other than undercoats before erection or assembly shall be submitted to and accepted by City’s Representative in writing before proceeding with coating.
b. Surfaces exposed to atmosphere which would be inaccessible for painting after erection or assembly shall receive full number of coats before erection or assembly. c. Caulk open seams at contact surfaces of stiffeners and built-up members which would retain moisture with non-sag polysulfide material conforming to Federal Specification TT-S-230, Type 2 or other accepted material before applying second coat of primer. d. Emulsion and alkyd paints shall contain mildewcide, and both paint and mildewcide shall conform to Federal Specification TT-P-19
DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C

Page 601 of 2077 ends

e. Do not use finish coats containing lead.
f. Do not paint stainless steel surfaces.
g. Except for anchor bolt assemblies, steel surfaces embedded in concrete need not be painted.

2. Schedule coating Work to avoid excessive dust and airborne contaminants. a. Protect Work from dust and airborne contaminants during coating application and curing.

3. Work is subject to intermittent shutdown if, in opinion of City’s Representative, cleaning, coating and painting operations are creating localized condition detrimental to ongoing facility activities, personnel or adjacent property.
a. In event of emergency shutdown by City’s Representative, immediately correct deficiencies.
b. Additional costs created by shutdown shall be borne by Contractor.

4. Remove dust, blast particles, and other debris from blast-cleaned surfaces by dusting, sweeping, and vacuuming.
a. Allow ventilator fans to clean airborne dust to provide good visibility of working area prior to coating applications.
b. Remove dust from coated surfaces by dusting, sweeping, and vacuuming prior to applying succeeding coats.

5. Previous paint coats shall be dry and fully cured and surface of paint coat being covered shall be free from moisture, dust, grease, and deleterious material which would prevent bond of succeeding paint coats.
a. In spot coating old paint which lifts after application of first spot coat shall be removed by scraping and the area repainted before applying second coat.

6. Conform to Manufacturer’s Application Instructions, completing Work within over-coating timeframe of prime or intermediate coat.
a. Follow recommendations of Manufacturer including selection of spray equipment, brushes, rollers, cleaners, thinners, mixing, drying time, temperature and humidity of application, and safety precautions.
b. Do not paint under adverse ambient conditions that may affect life or appearance of coating.
c. Do not apply coatings over damp or moist surfaces.

7. Prepare undercoats and intermediate coats to differ noticeably in coloration to each other on succeeding coating applications to ensure even coverage by shading or tinting, as appropriate, for paint material and color.
a. Shading or tinting shall be done by Manufacturer.

8. Uniformly apply coatings at spreading rate required to achieve specified DFT. a. Application shall be by airless spray method, except brush and roller application may be required for exterior surfaces if environmental and neighborhood conditions preclude spray application.
b. Apply coatings to be free of film characteristics such as runs or blisters that might adversely affect performance or appearance of coating systems.

9. Spraying shall be done by cross-lap method of spraying, stroking first in 1 direction and shortly later, spraying across this section at right angles to first set of passes. a. Exercise care during spraying to hold nozzle perpendicular and sufficiently close to receiving surface to avoid excessive evaporation of volatile components or loss of material to air or bridging of cracks and crevices.
b. Runs, sags, thin areas in paint coat, or skips and holidays shall be considered as evidence Work is unsatisfactory, and Contractor may be required to apply remaining paint by brush.

10. When finished and dried, brush strokes shall appear in 1 direction only. a. There shall be no curved brush strokes showing.

DocuSign Envelope ID: C84981ED-FBC3-4385-B815-326A43071F1C