01 33 00 – Submittal Procedures - Page 13 of 16
7-18-vw

1.15 Unit Prices
A. Payment for submittals and resubmittals, will be included in the price bid for those items of Work for which the submittals are required.

PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)

END OF SECTION

Page 1146 of 1826 ends

01 33 00 – Submittal Procedures - Page 14 of 16
7-18-vw

THIS PAGE INTENTIONALLY BLANK

Page 1147 of 1826 ends

01 33 00 – Submittal Procedures - Page 15 of 16
7-18-vw

SUBMITTAL TRANSMITTAL FORM
FROM: _________________________
ADDRESS: _________________________
_________________________
_________________________
TELEPHONE: _______________________
TO: City of Corona
Utilities- Water Operations
755 Public Safety Way
Corona, CA 92880
DATE: ____________________________
PROJECT NAME: ___________________
___________________
PROJECT NO.: ___________________
ATTN: ____________________________
Construction Manager
SUBMITTAL NO.:
□ THIS IS AN ORIGINAL SUBMITTAL □ THIS IS A REVISION OF SUBMITTAL NO.

SUBJECT OF SUBMITTAL:

SPECIFICATION SECTION(S): PLAN SHEET NUMBER(S):

CONTRACTOR'S CERTIFICATION: Check & Complete either (A) or (B) below:
(A) We have reviewed in detail and certify material, equipment or construction procedure(s) contained in this submittal meet all requirements specified in or shown on Contract Documents, Construction Specifications and Construction Plans with no exceptions. (B) We have reviewed in detail and certify material, equipment or construction procedure(s) contained in this submittal meet all requirements specified in or shown on Contract Documents, Construction Specifications and Construction Plans except for the following deviations:

Contractor’s Authorized Signature:

Page 1148 of 1826 ends

01 33 00 – Submittal Procedures - Page 16 of 16
7-18-vw

THIS PAGE INTENTIONALLY BLANK

Page 1149 of 1826 ends

4-20-dp 01 35 26 – Governmental Safety Requirements - 1 of 6 SECTION 01 35 26

GOVERNMENTAL SAFETY REQUIREMENTS
PART 1 - GENERAL

1.1 Work Included
A. Governmentally mandated safety requirements, including compliance with OSHA and CalOSHA requirements for worker safety.

B. No attempt is made to replicate or interpret existing OSHA and CalOSHA worker safety requirements referenced herein. Contractor’s attention is directed to certain critical sections of regulations to allow them to reference and interpret the original regulations for themselves.

C. No attempt is made to set out in detail means or methods necessary to satisfy requirements for worker and public safety. Recognition of requirements set forth by law is made to assist Contractor in identifying necessary costs during bid preparation.

1.2 Related Work
A. Section 01 04 00: Coordination
B. Section 01 33 00: Submittal Procedures
C. Section 01 50 00: Temporary Facilities and Controls
D. Section 02 41 13: Selective Site Demolition
E. Section 32 12 16: Paving Conforming to Greenbook Specifications F. Section 31 05 50: Protecting Existing Utilities

1.3 Submittals
A. Furnish the following submittals:

SUBMITTAL DESCRIPTION
Designation of “Project
Safety Official”
Submit name and phone number to City’s Representative at preconstruction meeting.

Designation of
“Competent Person”
Submit name and phone number to City’s Representative at preconstruction meeting.

Injury and Illness
Prevention Program
Submit description of Contractor’s procedures and requirements for safety and hygiene.

Excavation and Shoring
Working Drawings
(Shoring Plan)
Submit detailed plan showing design of shoring, bracing, sloping, or other provisions for worker protection from hazard of caving ground during excavation of any trench, pit, or excavation ≥ 5’ deep.

Shoring plan will be rejected if:
• Plan is based on subsurface conditions more favorable than those shown in Geotechnical Investigation.
• Plan is not prepared by California-licensed civil or structural engineer. • Plan does not address allowable surcharge loads.
• Plan does not fully conform to submittal requirements shown herein.

If shoring plan varies from shoring system standard drawings, plan shall be prepared by California-registered structural or civil engineer as required by CAL/OSHA Construction Safety Orders and applicable laws.

Shoring plan shall be engineered to accommodate surcharge on side of trench of at least 300 psf to allow for equipment wheel loads or stockpiling of materials. Plan shall show allowable surcharge loads for nearby embankments and structures, for spoil banks, and for construction equipment and other construction loading. For all trench conditions, shoring plan shall show minimum horizontal distances from side of trench at its top to near side of surcharge loads.

Plan shall show sequence and procedure for installing and removing shoring system components.

Page 1150 of 1826 ends

4-20-dp 01 35 26 – Governmental Safety Requirements - 2 of 6

SUBMITTAL DESCRIPTION
Shoring plan shall show and accommodate protection of existing underground utilities.

Plan shall include note stating registered civil or structural engineer certifies plan complies with CAL-OSHA Construction Safety Orders, or that registered civil or structural engineer certifies plan is not less effective than shoring, bracing, sloping, or other provisions of Safety Orders.

California Division of
Industrial Safety
Excavation Permit
Submit copy of excavation permit from State Division of Industrial Safety prior to start of excavation.

Confined Space Entry
Program (CSEP)
Submit CSEP meeting requirements of California Code of Regulations Title 8, Sections 5156, 5157, and 5158 addressing confined space procedures including:
• Training of personnel
• Purging and cleaning space of materials and residue
• Potential isolation and control of energy and material inflow • Controlled access to spaces
• Atmospheric testing of spaces
• Ventilation of spaces
• Special hazards consideration
• Personnel protective equipment
• Rescue plan provisions.

Include names and daytime telephone numbers of Contractor’s personnel including each Subcontractor’s personnel assigned to Work having CSEP responsibilities, their CSEP training, and their specific assignment and responsibility in carrying out the CSEP.

Material Safety Data
Sheets
Submit copies of MSDS sheets from chemical manufacturers for all chemical used during construction, startup and testing, or operational activities Job Hazard Analysis Where workers are expected to encounter hazardous materials, submit Job Hazard Analysis documenting:
• Hazard communications program.
• Safety precautions for all persons who may be exposed to hazardous substances used by Contractor as presented in Construction Safety Plan. • Number of people to be involved in Work.
• Written verification that all safety measures will be carried out. • Written verification that required safety equipment is available.

B. Construction safety shall be Contractor’s sole responsibility. City review of safety submittals is for general compliance and coordination only.

1.4 Safety and Health Regulations
A. Contractor shall have full authority over and shall bear full responsibility for jobsite safety and for safeguarding their employees from injury or illness due to construction-related activities.

B. Comply with Safety and Health Regulations for Construction, promulgated by Secretary Standards Act, as set forth in Title 9, CFR. Copies of these regulations may be obtained from Labor Building, 14th and Constitution Avenue NW, Washington, DC 20013.

C. Comply with provisions of Federal Occupational Safety and Health Act, as amended, and with all applicable State of California, Department of Industrial Relations, Construction Safety Orders (CalOSHA) requirements.

D. In response to COVID-19 epidemic, comply with applicable safety orders from Riverside County Public Health Officers including policies regarding face coverings, social distancing, and allowable gathering sizes.

E. Refer to Paragraph 1.3 “Submittals” for required safety submittals.

F. Contractor shall provide safety measures as necessary to protect public and workers within, or in vicinity of Work site. Contractor shall ensure their operations do not create safety hazards.

Page 1151 of 1826 ends

4-20-dp 01 35 26 – Governmental Safety Requirements - 3 of 6 G. All workers shall wear appropriate personal protective equipment (PPE) including safety vests, eye protection, safety shoes, and hard hats as required by OSHA.

H. Contractor shall certify they are experienced and qualified to anticipate and meet safety and health requirements of Work and shall require their personnel to observe proper safety and hygienic precautions.

I. Provide safety equipment, material, and assistance to City’s personnel to facilitate safe and proper inspection of all Work phases.

J. Contractor shall designate in writing a “Project Safety Official,” who shall be at Work site at all times Work is in progress and who shall be thoroughly familiar with Contractor’s Injury and Illness Prevention Program (IIPP) and Code of Safe Practices (CSP). Project Safety Official shall be available at all times to abate any potential safety hazards and shall have authority and responsibility to shut down an unsafe operation, if necessary.

K. Contractor shall have copies or suitable extracts of Construction Safety Orders, Tunnel Safety Orders, and General Industry Safety Orders issued by California State Division of Industrial Safety at Work site
L. Comply with all federal, state, and local laws, regulations, and requirements for handling and storage of chemicals.

M. Monitor for explosive gas levels.

1.5 Confined Space Procedures
A. Confined space safety procedures shall address the following:

B. Entry into permit-required confined spaces as defined in California Code of Regulations Title 8, §5157 may be required as part of Work.

C. This notice is provided for bidding purposes. In accordance with California Code of Regulations Title 8 General Industry Safety Orders, §5157(c)(8), City will provide available information to Contractor for each confined space location. Confined space work areas include:

1. Work areas for which entry is expected to be in accordance with California Code of Regulations Title 8 §5157 (c)(5), Non-Permit required Confined Spaces;

2. Work areas in which hazardous or potentially hazardous atmospheric conditions exist or may exist shall be in accordance with California Code of Regulations Title 8 §5157 (d), (e) and (f) (Permit-Required Confined Space):
• Manholes
• Pipelines
• Tanks
• Vaults

3. The above enclosed or partially-enclosed spaces shall be considered permit-required confined spaces until pre-entry procedures demonstrate otherwise.

4. Prior to start of Work, submit Confined Space Entry Program (CSEP). Refer to Paragraph 1.3 “Submittals” for required CSEP submittal requirements.

5. Before performing work in permit-required confined spaces, Contractor shall implement, administer, and maintain Confined Space Entry Program (CSEP) in accordance with California Code of Regulations Title 8, §5156, 5157, and 5158.

6. Retain copy of said regulations on worksite.

7. Copy of permit shall be available at all times for review by Contractor and City’s Representative at Work site.

8. California law and City’s policy on confined spaces require 2-week advance notification from Contractor for work within confined spaces, submittal of Contractor’s confined space work procedures and rescue plan, compliance with Entry Permit procedures, participation in hazard assessment review of planned precautions and a debriefing upon

Page 1152 of 1826 ends

4-20-dp 01 35 26 – Governmental Safety Requirements - 4 of 6 completion of confined space operation. Compliance with General Industry Safety Orders remains Contractor’s responsibility

9. Contractor’s is legally obligated to satisfy all requirements of Title 8, CCR 5157.

10. Attention is also directed to “Sewer System Entry”, Appendix E to CCR 5157.

11. Permit-required confined spaces may be reclassified by City Safety staff to non-permitrequired confined spaces at Contractor’s expense through provisions set forth in 5157 (c)(7), or a listed non-permit required work area may become a permit- required confined space work area.

12. Where continuous flow of sewage and contaminant may occur in a confined space, atmosphere may suddenly and unpredictably become lethal. Where there is conflict between applicable safety orders, laws and regulations and policies, the more stringent measures shall apply.

D. Work may expose Contractor's employees to hazardous materials underground and from nearby facilities. Hazardous materials may include asbestos, lead, petroleum products, propane gas, natural gas, diesel fuel, gasoline, combustion exhaust products, sewer gas, aqueous ammonia, sodium hypochlorite, treatment chemicals, wastewater and other chemicals.

1.6 Hazardous Substance Safety Procedures
A. Contractor’s hazardous substance safety procedures shall address the following:

1. Contractor shall certify they are experienced and qualified to anticipate and meet safety and health requirements of this Project.

2. Contractor shall require their personnel to observe proper safety and hygienic precautions.

3. Contractor shall be solely responsible for storage, usage, handling and application of hazardous materials encountered or provided as part of Work.

B. Where asbestos is being removed or cut, requirements of California Code of Regulations Title 8 Division 1, Chapter 4, Subchapter 4 and Subchapter 7 shall be implemented.

C. Contractor shall be solely responsible for storage, use, handling, and application of all hazardous materials encountered or provided as part of Work.

D. Job Hazard Analysis:

1. Comply with provisions of Hazards Communication Act (California Code of Regulations Title 8, §5194). If hazardous substances are to be used or handled in course of Work, before commencing each task conduct job hazard analysis for City.

2. Refer to Paragraph 1.3 “Submittals” for Job Hazard Analysis submittal requirements.

1.7 Fire Safety
A. Avoid fire hazards in all welding, cutting, and equipment fueling. Furnish safety devices, fire extinguishers and fire watch personnel required to protect Work and provide for worksite and public safety.

1.8 Excavation Safety
A. Contractor’s excavation safety procedures shall address the following:

1. Prior to beginning any excavation ≥ 5’ deep, Contractor shall submit to City’s Representative name of “Competent Person” as defined in California Code of Regulations Title 8, §1504.

2. Competent person shall be at Work site as required by Cal OSHA.

Page 1153 of 1826 ends

4-20-dp 01 35 26 – Governmental Safety Requirements - 5 of 6

3. Do not begin excavating any trench ≥ 5’ deep, prior to acceptance of Excavation and Shoring Working Drawings required in Paragraph 1.3 “Submittals”, and Contractor submitting excavation permit from California State Division of Industrial Safety.

4. If Contractor fails to submit shoring plan or fails to comply with accepted shoring plan, Contractor shall suspend work at affected location(s). Such suspended work shall not be basis of claim for Extra Work, and Contractor shall receive no additional compensation or Contract time.

B. Excavation Plans for Worker Protection Required by California Labor Code §6705:

1. Excavations shall be performed, protected, and supported as required for safety and in a manner set forth in operation rules, orders, and regulations prescribed by CAL/OSHA Construction Safety Orders.

2. Refer to Paragraph 1.3 “Submittals” for Shoring Plan submittal requirements.

3. City or its Engineer(s) may have made investigations of subsurface conditions in areas where Work is to be performed. If so, these investigations are provided for Contractor’s use, but not made a part of Contract Documents. Records of such investigations, if performed, are available for inspection at City’s office. See Contract General Conditions for more information regarding soils investigations.

4. Maintain excavations within street right-of-way and easements.

5. Do not use shoring system as a form for cast-in-place concrete. Provide adequate space between structure and shoring system for installing and removing forms. Where space between shoring and structure is not sufficient to provide adequate backfill compaction equipment, backfill with 2-sack sand cement slurry.

6. Nothing contained in this section shall be construed as relieving Contractor of full responsibility for providing shoring, bracing, sloping, or other preventive measures necessary for worker protection, nor for any liability resulting from failure to do so.

C. Open Trenches

1. No trench may be left open overnight unless authorized in writing by City’s Authorized Representative.

2. Cover open excavations with steel plates in areas requiring vehicle/truck traffic when not in use. Provide safety fencing around the entire area at all other excavations when not in use.

D. Use of explosives on Work is prohibited.

1.9 Scaffolding, Rigging, and Hoisting Safety Procedures A. Provide scaffolding, rigging, hoisting, and services needed to safely deliver, support, move and install Work. Remove same from premises when Work is complete.

1. Comply with OSHA requirements and applicable laws, ordinances, rules, regulations, and orders pertaining to construction machinery and equipment, hoists, cranes, scaffolding, staging, materials handling facilities, tools, appliances and other construction aids.

2. Obtain safety bulletins and printed safety instructions from Manufacturers regarding proper operation of their equipment and installation of their products.

3. Provide railings, kick plates, enclosures, safety devices, and controls required by Laws and Regulations and as required for adequate protection of life and property.

4. Design temporary supports with adequate safety factor to assure adequate load bearing capability.

5. When requested, submit design calculations by professional engineer registered in State of California before applying loads. Submitted design calculations are for information and record purposes only.

Page 1154 of 1826 ends

4-20-dp 01 35 26 – Governmental Safety Requirements - 6 of 6 B. Prepare and implement accident prevention and safety program to include, but not be limited to:

1. Exercise precautions throughout construction for protection of persons and property.

2. Observe safety provisions of applicable laws and regulations.

3. Observe safety provisions recommended by applicable Manufacturers of products, chemicals, and construction equipment.

4. Post safety provisions in conspicuous and logical location accessible to workers on-site for reference.

5. Guard machinery and equipment and eliminate other hazards.

6. Make reports required by authorities having jurisdiction, and permit safety inspections of the Work.

7. Before commencing construction Work, take necessary action to comply with provisions for safety and accident prevention.

C. Adequately identify and guard hazardous areas and conditions by visual warning devices and, where necessary, physical barriers. Devices shall conform to minimum requirements of OSHA and State agency which administers OSHA regulations where Project is located.

D. Mark or guard excavations in areas from which public is excluded, in manner appropriate for hazard.

E. On multi-level structures, provide safety protection that meets requirements of OSHA and State agency which administers OSHA regulations where Project is located.

1.10 First Aid Information
A. Post first aid facilities and information posters conforming to requirements of OSHA and other applicable Laws and Regulations in readily accessible locations.

1.11 Chemical Handling
A. Obtaining prior acceptance from City for chemical usage.

B. Obtain MSDS sheets from chemical manufacturers. Post copies on-site in conspicuous location for worker reference.

C. Submit MSDS sheets to City’s Representative for all chemicals used during construction, startup and testing, or operational activities, prior to bringing them on site, whether defoliant, soil sterilant, herbicide, pesticide, disinfectant, polymer, reactant, fuel, lubricant, or of other classification, which shows approval of either U.S. Environmental Protection Agency or U.S.

Department of Agriculture.

D. Use and dispose of residues of all such chemicals in strict accordance with printed instructions of Manufacturer.

1.12 Unit Prices
A. Payment for Contractor’s safety procedures, compliance with provisions of safety orders, and OSHA and Cal OSHA regulations will be included in prices bid for items of appurtenant Work.

PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION (not used)

END OF SECTION

Page 1155 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 1 of 12
SECTION 01 40 00

QUALITY REQUIREMENTS
PART 1 - GENERAL

1.1 Work Included
A. Inspection and testing laboratory qualifications, duties and responsibilities.

1. Contractor’s Quality Control Plan and Site Quality Control Plan conforming to ANSI/ASQ E1 for design, procurement, manufacturing, construction, installation and testing activities, ANSI/ASQ E2 for inspection activities related to Work, and ISO 9001 or Cityaccepted substitute for manufacturing facilities.

2. City's inspection and testing.

3. General quality requirements.

4. Contractor’s Quality Control Plan and Site Quality Control Plan shall remain in effect for duration of Work.

B. Refer to Section 31 23 00 for soil compaction testing requirements.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 22 00: Unit Prices
C. Section 01 33 00: Submittal Procedures
D. Section 31 23 00: Excavation and Fill

1.3 Reference Standards
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ANSI/ASQ E1 Quality Program Guidelines for Project Phase of Nonnuclear Power Generation Facilities

2. ANSI/ASQ E2 Guide to Inspection Planning

3. ASTM E329 Agencies Engaged in Construction Inspection, Testing, or Special Inspection

1.4 Quality Assurance
A. Work shall conform to Federal, State and local building codes, electrical codes, fire codes, mechanical codes, energy codes, green building standards codes, and plumbing codes, and to Occupational Safety and Health Act (OSHA) Regulations.

1. Nothing in Contract Documents shall be interpreted as permission or direction to violate any governing code or ordinance.

B. Where reference is made to 3
rd
-party standards such as ANSI, AWWA or ASTM
specifications, or standards or codes adopted or promulgated by public agency, it shall mean latest edition thereof formally adopted and published at time of advertisement for bids.

C. “Tying” or “Bundling” of manufactured equipment into packages to thwart competition shall be considered in non-conformance to intent of Contract Documents.

1. City is under no obligation to accept any Manufacturer based on such “bundling” arrangements and may elect to reject bundled Manufacturers solely because such bundling, in City’s opinion, represents unfair business practice.

D. Manufacturer’s production facilities shall be open for inspection by City or City’s Representative throughout production and testing of products furnished under this Contract.

1. Notify City’s Representative in writing in advance of manufacture of materials as required to facilitate specified City-provided testing or inspection at source of supply. a. City may elect to witness, at their expense, factory tests and certifications required by Contract Documents by reporting intent to do so to Contractor.

2. Notify City’s Representative in writing of time and place of specified factory tests ≥14 Calendar Days before they begin.

Page 1156 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 2 of 12
a. Complete manufacturing operations, checks, adjustments and tests before City’s factory inspection.
b. Factory testing and inspections shall be performed during normal working hours.

3. Notify City’s Representative promptly if scheduled test or inspection is cancelled or rescheduled.
a. If City has given notice of intent to witness testing, City will back-charge Contractor for costs incurred by City due to Contractor’s failure to provide 72-hour notice to City’s Representative of rescheduling or cancellation of tests and inspections.

4. Unless otherwise specified, testing equipment shall be calibrated by testing agency acceptable to City at intervals ≤12 months or following repair or relocating of test equipment.

5. Factory-witnessed tests, where required, shall be completed ≥14 Calendar Days after written notification is delivered to City.
a. City will pay travel expenses for City’s personnel (up to 2 persons) to and from factory or laboratory performance test location within 50 miles of Work for 1 st test
only.
b. Contractor shall pay City’s travel, lodging, food, auto rental, standby, and subsistence expenses for City’s personnel (up to 2 persons) for factory-witnessed tests performed >50 miles from Work and for inspections ≤50 miles of Work after failing first test or inspection.
c. If test results indicate, in opinion of City’s Representative, that tested equipment fails to meet specified requirements, City’s Representative will notify Contractor of performance test failure.
d. Contractor shall thereupon notify Manufacturer to reschedule testing and notify City of time of retest.
e. Manufacturer shall thereupon, at no expense to City, make modifications and perform tests as required to demonstrate conformance to Specifications.

E. Tests of items at place of manufacture during and/or upon completion of manufacture, shall include material tests, hydraulic pressure tests, electric and instrumentation subsystem tests, performance and operating tests and inspections in conformance with relevant industry standards and as detailed in these Specifications.

1. Tests shall satisfy City’s Representative that items tested and inspected comply with Contract requirements.

F. Furnish samples required for testing.

1. Cost of material samples to be tested shall be paid by Contractor.

2. Cost of testing, sampling and laboratory services shall be paid for by City or Contractor as shown.

G. Testing by independent testing agencies shall proceed as follows:

1. Testing agencies shall conform to ASTM E329, shall have ≥5 years’ experience in appropriate area of specialty, and shall be listed on “Roster of Approved Testing Agencies” for either City of Los Angeles, or shall be accepted by City.

2. Where required by these specifications, or where tests occur >50 miles from Work, hire City-accepted independent laboratory to perform testing and certify results. a. Provide labor, products, tools, instruments, water, and power as directed for sampling for required tests.

3. Samples for testing shall be representative of final Work product. a. Samples to be tested or inspected shall be selected by Testing agency, laboratory or City and not by Contractor.
b. Samples treated differently from final Work product will not yield valid test results.

4. Tests of products shall follow commonly recognized standards of national technical organizations, and specified sampling and testing methods.

5. Contractor shall pay for quality assurance testing unless otherwise shown.

6. Retest costs or other testing costs invoiced to City and specified to be paid by Contractor may be deducted from Contractor’s next progress payment in lieu of Contractor’s direct payment of invoice.

Page 1157 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 3 of 12

7. City may test representative samples of each type and size of product furnished using independent testing agency.
a. Failure of samples to pass tests will be deemed sufficient cause to reject entire lot delivered.
b. Do not delivery materials to Work site which have not satisfactorily passed specified testing and inspection.

H. Testing by City shall proceed as follows:

1. Notify City’s Representative in writing ≥14 Calendar Days before City testing of materials is required.

2. Written notice shall include name of supplier along with contact information, address and telephone number for material source or Manufacturer.

I. Test equipment (meters, gauges, torque wrenches, sensors, etc.) supplied or used for taking or recording of qualitative data shall:

1. Have accuracy equal to or exceeding stated acceptance criteria tolerances for test or Work performed.

2. Have current calibration with traceability to National Institute of Standards and Technology (NIST).
a. Supply calibration records.

3. Have traceability to national standards in country of use, subject to acceptance by City’s Representative, where such equipment is supplied and used in facilities outside United States.

J. Compute moving averages as follows per SSPWC (Greenbook) §211-5.:

1. Round moving averages to same number of significant figures as reported for individual test results.

2. When figure to be dropped ≤5, round down.
a. If >5, round up.

3. Moving average shall be continuous for individual material plant or batch plant.

4. In determining moving average for material properties, use all test results representing material used in Work in calculation.

5. Enter test results into calculation sequence in chronological order that Work is performed.

6. First individual test result shall start moving average and shall meet moving average requirements.
a. Until >4 test results are available, moving average shall be numerical average of test results.

7. When > 4 test results are available, determine moving average by multiplying previous moving average by 4, adding new result to this product, and then dividing sum by 5.

8. In computing moving average, whenever upper calculation limit-values for individual tests are stated, use upper calculation limit value in calculations in lieu of test results exceeding upper calculation value.

K. Employ only competent workers on Work.

1. Employed persons found to be incompetent, intemperate, troublesome, disorderly, or otherwise objectionable or who fail to perform Work properly, acceptably and in accordance with Manufacturers’ installation and warranty requirements, shall be immediately removed from Work by Contractor and not reemployed on Work.

2. Welders shall be AWS certified for type of work they are performing. a. Welders on steel pressure piping or tank work shall be AWS certified as boiler and pressure vessel welders per §IX Part A of AWS B2.1 as required by AWWA C200 §3.3.3.1.

3. Steel fabricators shall be certified under AISC Quality Certification Program.

4. Other fabricators shall have ≥5 years’ experience in appropriate area of specialty and shall be listed on “Roster of Licensed Fabricators” for City of Los Angeles, or shall be accepted by City.

Page 1158 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 4 of 12

5. Deputy Inspectors shall comply with ASTM E329 and have ≥5 years’ experience in appropriate area of specialty and shall be listed on “Roster of Approved Testing Agencies” for City of Los Angeles or shall be accepted by City.

L. Make reasonable efforts to prevent unauthorized personnel or domestic animals from entering Work site.

1. When directed by City, remove unauthorized personnel and domestic animals from City’s property.

M. Upon completion of Contract, Work shall be finished, tested and ready for operation.

1. Work shall fulfill its intended purpose as described in Contract Documents, in submittals, and in Manufacturer's literature.

N. Form of evidence of satisfactory fulfillment of installed test and inspection requirements shall be, at City’s Representative’s discretion, either tests or inspections carried out in City’s Representative's presence, or by certificates and reports of tests and inspections carried out by accepted persons or organizations.

1.5 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

MOBILIZATION SUBMITTALS
Quality Control Plan Submit Quality Control Plan for planned and systematic activities to cover Work specified under this Contract.

Quality Control Plan shall cover:

1. Quality control team organization chart

2. Procedures for preventing nonconforming Work

3. Contractor’s qualifications.

4. Subcontractor qualifications.

5. Material Procurement Control, including sources of materials and procedures regarding traceability of materials.

6. Material testing.

7. Manufacturing schedule.

8. Welding procedures.

9. Individual welder qualification certificates for shop and field welding.

10. Plant QA/QC recordkeeping and means of transmitting records to City.

11. Nondestructive Testing.

12. Control and Inspections of fabrication and manufacturing.

13. Shop test and inspection requirements.

14. Packaging and shipping procedures.

15. Storage, handling, erecting and installing instructions.

16. Hold Points (Tests, inspections, and operations requiring City to witness and accept manufacturing operations before further Work may proceed.)

17. Records and Documentation.

18. Material certifications

19. Shop test, NDT, and inspection records. Show accepted test procedure, latest revision, results, date, and name of inspector or tester of examined Work.

20. Engineering calculations

21. Design drawings

22. Warranties

23. Other details regarding adherence to Contract Documents.

Site Quality Control
Plan
Also submit Site Quality Control Plan defining field inspections and tests to ensure work performed on site conforms to Contract Documents and Manufacturers’ Installation Instructions.

Site Quality Control Plan shall cover:

1. Quality control team organizational chart

2. Procedures for preventing nonconforming Work

3. Work instructions and procedures for in-process inspections and testing

4. List of inspections and tests to be performed (photocopies of Contract Documents are acceptable)

5. Data sheets for inspection and testing

Page 1159 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 5 of 12

SUBMITTAL DESCRIPTION

6. Testing laboratory qualifications.

7. Deputy Inspector qualifications.

8. Field Test and Inspection Requirements

9. System Integrator qualifications.

10. Paving quality.

11. Concrete quality.

12. Welding quality
• Welding operator qualifications.
• Welding Personnel Qualification Records.
• Welding Inspector qualifications.
• Welding rod control procedures.
• Weld Procedure Specifications.
• Weld Procedure Qualifications Records.

13. Painting and Coating System quality

14. Mechanical, Plumbing, and HVAC System quality

15. Electrical and Instrumentation System quality

16. Hold Points (Tests, inspections, and operations requiring City to witness and accept manufacturing operations before further Work may proceed.)

17. Records and Documentation
• Testing laboratory reports
• Contractor’s field inspection reports
• Data sheets
• System demonstration logs
• Warranties

18. Record Drawing procedures

19. Final Inspections and Testing

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Site Quality Control
Plan Inspection and
Testing Data Sheets
Submit completed data sheets for inspections and tests performed on site to City’s Representative no later than start of next-day shift.

Certificates of
Compliance
Where specified in Contract Documents or on City’s Request submit certificates of compliance prior to shipment or use of products.

Certificate shall be signed by Manufacturer certifying Work provided conforms to or exceeds requirements of Contract Documents.

Attach supporting reference data, affidavits and certifications as appropriate Submit certification letters on Manufacturer’s letterhead for powered equipment >5 horsepower.

Transcripts of
Acceptance Test
Results
Submit on City’s Request as needed to verify quality of manufactured products.

Report shall describe date and time of test, Work tested, test instrumentation, list of test personnel, calibrations of measuring equipment, test procedure, pass/fail criteria, tabulations of measurements taken, sample calculations, test results, final adjustments and settings, and guaranteed performance data.

Transcripts of acceptance test results shall be in English language.

Submit transcripts of chemical resistance tests on City’s request.

CLOSEOUT SUBMITTALS
Certificates of Proper
Installation
Where specified in Contract Documents, where warranties >1 year are specified, for powered equipment >2 horsepower, or drawing >5 amps at 480VAC, or on City’s Request, submit Manufacturer’s certificates of proper installation after installation of products.

For powered equipment >2 horsepower, or drawing >5 amps at 480VAC, submit Manufacturer’s certificate of proper installation stating:

1. Equipment has been factory-checked or field-checked as necessary and is approved for operation.

2. Equipment operates within allowable limits for vibration.

3. Controls, protective devices, instrumentation, and control panels furnished as part of equipment package are properly installed, calibrated, and functioning.

4. Control logic for start-up, shutdown, sequencing, interlocks, and emergency shutdown have been tested and are properly functioning.

5. Equipment has been installed and adjusted in accordance with Manufacturer's

Page 1160 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 6 of 12

SUBMITTAL DESCRIPTION
requirements and is properly aligned and ready for operation.

6. Equipment has been serviced, lubricated and properly prepared to perform in accordance with intent of Contract Documents.

7. Equipment is ready for operation, and City’s Staff is suitably instructed in operation and maintenance of equipment.

8. Specified Manufacturer's warranty will commence, and be in full force from date of final acceptance of project or applicable portion of project by City.

9. Signer has visited site, inspected equipment and installation, and certifies equipment is ready and suitable for full time operation under full-load conditions.

Certificate shall be signed by Manufacturer and Contractor, certifying material or equipment specified and installed conforms to or exceeds requirements of Specifications and has been inspected by authorized field representative.

Attach supporting reference data, affidavits and certifications as appropriate Reports of Installed
Test and Inspection
Results
Provide and use forms acceptable to City’s Representative which show test information, including specified operational parameters.

1.6 Contractor’s Quality Control
A. Develop Quality Control and Quality Assurance Program for all phases of Work in accordance with ANSI/ASQC E1.

1. Quality control requirements apply to Contractor and subcontractors.

2. Quality Control Plans shall establish authority and responsibility of those responsible for quality program administration, inspections, tests and plan of execution. a. Include organizational charts in Quality Control Plan showing relationship(s) among Contractor’s, subcontractors, management, engineering, purchasing and quality assurance/quality control.

3. Maintain Quality Control Plan organizational chart to reflect current organization and lines of authority throughout Contract duration.

4. Persons performing quality functions shall be qualified by training, education, or experience and have sufficient and defined authority to enforce quality requirements, to identify, initiate, recommend and provide solutions to quality problems and to verify effectiveness of solutions.

5. Monitor quality control of suppliers, Manufacturers, material, equipment, services, site conditions and workmanship to produce Work of specified quality.

6. Conform to specified standards as minimum quality for Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.

7. Perform Work using qualified personnel to produce workmanship of specified quality.

8. Conform to applicable Manufacturer’s instructions and procedures.

9. Program documents shall be available for review by City’s Representative.

B. City’s Representative reserves right to audit Contractor facilities for purpose of verifying compliance with accepted Quality Control Plan.

1. Quality program records shall be controlled by Contractor to provide easy access for record retrieval and maintenance.
a. Make records available to City’s Representative upon request for inspection or City’s Representative’s use.

2. City’s Representative has right to observe Contractor’s Work including design, manufacture, installation, shop or field inspections and tests.

3. Contractor shall coordinate quality activities with City’s Representative.

4. City’s Representative may perform or have performed on its behalf factory inspections during manufacture and testing.

5. Provide City’s Representative unrestricted access to Contractor’s and Subcontractor’s shops for such inspections.

6. City’s exercise of or failure to exercise their right to inspect, witness, test, or audit and subsequent acceptance of Work by City’s Representative shall not relieve Contractor of their obligation to comply with terms and conditions of Contract.

Page 1161 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 7 of 12
C. Subject products, material, and equipment furnished to testing programs at place of manufacture and in field.

1. Products, materials, and equipment will be subject to inspection by City’s Representative.

2. Complete shop and field inspections and tests in accordance with its “accepted” Quality Control Plan, and requirements herein.
a. Record and have involved parties sign off on tests, inspections, and examinations, as well as established results.

3. Provide labor, equipment, calibrated instruments, instrumentation, and other test equipment for testing and commissioning.
a. Labor for testing shall include preparation of procedures, wiring and connecting test equipment and instrumentation, test equipment, instrumentation, materials and consumables, supervision of tests, collection and analysis of data and reports and other work necessary for testing.

4. Materials, elements, and devices related to or contemplated for incorporation in equipment during process of manufacture shall be subjected to tests and inspection deemed necessary in City’s Representative’s opinion to demonstrate compliance with Contract Documents.

5. Submit test results to City’s Representative for acceptance.

6. Acceptance of assemblies, tests and test procedures and acceptance of pertinent test certificates, inspection or waiving of inspections and tests shall in no way relieve Contractor of their contractual obligations for furnishing Work conforming to Contract Documents.
a. Compliance is duty of Contractor, and said duty shall not be avoided by acts or omissions of City’s Representative.

7. Perform checks and tests in accordance with:
a. Individual Specification sections.
b. Manufacturer’s and/or Contractor’s standard practices and recommendations. c. Reference and applicable testing standards.
d. Mutual agreement of Contractor and City’s Representative based on conditions arising in shop or in field.

8. Evaluate test results and advise City’s Representative immediately of discrepancies between test results and test limits or failure of device or system under test. a. Include test limits for acceptability applicable to each test on certified test records.

9. Furnish, set up, and operate test equipment and facilities. a. If factory testing facilities are unavailable to Manufacturer or Contractor, conduct tests elsewhere or have them performed by independent facility accepted by City’s Representative.

10. Protect material and equipment after testing so subsequent testing of other equipment or systems does not disturb, damage, or interfere with function of previously tested items.

11. If test results do not fulfill requirements specified or if defects attributable to Contractor are found in test results, repair, adjust or replace, and retest failing Work to satisfaction of City’s Representative.
a. Repairs shall be subject to acceptance by City’s Representative.

D. Contractor’s failure to stop at hold point may be cause for rejection of those items for which notification was not provided, or Contractor may be requested to repeat operation at their expense.

1. Hold Points require written notification in advance of scheduled time of performance as follows:
a. 10 working days for domestic Work
b. 15 working days for overseas Work.

2. City’s Representative may require activities performed without proper notification to be repeated for City’s Representative’s observation at Contractor’s expense.

E. Additional specifications and standards for special processes (such as welding, nondestructive testing, etc.) are specified in other sections of Contract Documents.

Page 1162 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 8 of 12

1. Specifications for special processes located in other sections of Contract Documents are “in addition to” those specified in this section and do not relieve Contractor from compliance with this section.

2. Should conflicts arise between different or overlapping standards and technical specifications, City’s Representative reserves right to determine applicable standard.

F. Arrange work to be readily accessible and easy to operate and maintain where detail drawings are not included in Contract Documents, supplementary drawings or Shop Drawings and submittals.

G. Design products for service intended.

1. Provide rugged construction, of ample strength for stresses which may occur during fabrication, transportation, erection and during continuous or intermittent operation, and transient conditions.

H. Products shall be adequately stayed, braced and anchored and installed in neat and workmanlike manner.

I. Combinations of manufactured equipment shall be fully compatible and work safely and successfully as a unit.

1. Furnish necessary mountings, couplings and appurtenances with each unit.

J. Relocations or adjustment of existing facilities noted in Contract Documents shall be done as needed.

1. If existing items are lost or damaged during construction, replace with new items of equal or better quality.

K. Make field measurements needed to fabricate and install Work before ordering or beginning Work.

1. Make minor changes in alignments and dimensions as needed to remedy or avoid utilities and structural conflicts.

L. If furnished products differ from those shown and which require changes to enclosures, mounting and support structures, power and control circuitry or other work to accommodate furnished product, provide changes required at no additional cost to City and of same quality as shown.

M. Nonconforming materials and equipment not meeting Contract standards, criteria, or specifications inadvertently used for this project shall be resolved through price deduction, repair, return to source, scrap, or rework at discretion of City’s Representative.

1. Requests for acceptance for deviations or nonconformance to Quality Control Plan shall be made to City’s Representative in writing.

1.7 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

1.8 Unit Prices
A. Refer to Section 01 22 00 for measurement and payment clauses for quality requirements.

PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION

3.1 Inspection
A. Products and Work shall be subject to field and factory inspection and testing in accordance with standards required and defined in Contract Documents.

1. Waiver by City of their right to inspect shall not relieve Contractor of duties to comply with Contract Documents.

Page 1163 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 9 of 12
B. Provide and pay for independent inspection, including CBC-required deputy inspection, and testing services required by Contract Documents.

C. Additional day-to-day inspection will be provided by City's Representative.

1. Provide ≥2 Working Days’ notice to City’s Representative in advance of required observations or inspections by City’s personnel.
a. For inspections by public authorities other than City, promptly inform City of scheduled dates for such inspections.
b. Before backfilling or covering Work, request inspection by City’s Representative to verify proper installation of buried or covered Work.
c. Before finishing, request inspection by City’s Representative to verify no surfaces to receive product have defects or errors which could result in poor or potentially defective application or cause latent defects in workmanship.

2. Inspection shall not be considered as direct control of individual workers and their Work. a. Inspections, tests, acceptances, or approvals by City's Representative or others shall not relieve Contractor from their duty to perform Work in accordance with Contract Documents.

3. City’s Representative will inspect products after delivery and throughout construction process.
a. Products will be subject to rejection at any time on account of failure to meet Contract Documents even though samples may have been accepted as satisfactory at place of manufacture.

4. Provide City’s personnel with safe and proper facilities to access and observe Work and to inspect or perform tests.

5. Procure and submit required certificates of inspection, testing or approval to City's Representative.

6. If Work is covered contrary to written instructions or work is covered before Contractor requests and receives inspection, uncover it at Contractor's expense, if requested by City's Representative.
a. Replace at Contractor's expense.

7. If City's Representative considers it advisable covered Work be re-inspected or tested by others, at City's Representative's written request, uncover Work in question, furnishing necessary labor, products, and tools.
a. If re-inspected Work is found defective, pay for uncovering, exposure, observation, inspection and testing and of satisfactory reconstruction. b. If, re-inspected Work is not found defective, Contractor will be allowed increase in Contract Price, extension of Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing and reconstruction, and a Change Order will be issued.

8. Where shown, City will pay for performance of tests, Contractor shall pay cost of failing tests.

D. If Contract Documents, permits, laws, ordinances, rules, regulations or orders of public authorities having jurisdiction require Work to be inspected, tested, or accepted by someone other than Contractor, give City's Representative timely notice of readiness.

1. Inspection and testing fees imposed by public agencies other than City shall be paid for by Contractor.

2. Procure and submit required certificates of inspection, testing or approval to City's Representative.

E. Permit authorized representatives and agents of Federal or State agencies to inspect work, products, and other relevant data and records.

3.2 Installation/Application/Erection
A. Materials and equipment shall be installed by specialists properly skilled in trades and professions required to assure 1
st
-class workmanship.

Page 1164 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 10 of 12

1. Where required by Contract Documents, Contractor shall cause installation of specific equipment items to be accomplished under supervision of factory-trained installation specialists furnished by Manufacturers.

B. Be prepared to document skills and training of workmen engaged in installation of equipment furnished either by Contractor or City.

C. Coordinate with Manufacturer when Manufacturer's field services are required.

1. Provide City ≥30 Calendar Days’ written notice prior to need for Manufacturer's field services furnished by Contractor.

D. Install products according to Manufacturer's Installation and Warranty requirements.

E. Install products to tolerances recommended by Manufacturer.

F. Install products according to and at location shown in Plans, Shop Drawings, and submittals.

G. Unless otherwise shown, install equipment true, plumb, and level using precision gauges and levels.

1. Do not shim between machined surfaces.

H. Refer variances between Manufacturer's installation instructions and Contract Documents to City’s Representative.

I. Upon completion of Contract, Work shall be finished, tested and ready for operation.

1. Work shall fulfill its intended purpose as described in Contract Documents, in submittals, and in Manufacturer's literature.

3.3 Field Quality Control
A. Frequency of sampling and testing shall be as shown, and shall be performed at such other times as necessary to document contract compliance.

B. Inform City’s Representative of installation and testing schedules ≥3 Calendar Days in advance of field tests.

C. Perform field tests in presence of City’s Representative in accordance with accepted Field Test Plan.

D. Give full cooperation to City’s Representative's inspection at Site during installation.

1. During assembly and installation, request City’s Representative's observation of inprogress tests, which will be impossible to check if installation proceeds further.

E. Within 24 hours of completing each in-progress field test, submit test results to City’s Representative.

F. Refer to Section 01 61 00 for field testing requirements for common products.

G. Repair, correct or replace work failing tests or inspection.

1. Repeat tests at Contractor’s expense, until results satisfy specifications.

2. Repair damages resulting from tests.

H. Repair damage to Work that is not cause for rejection.

I. Work done beyond lines and grades shown on Plans, or extra Work done without written authority of City’s Representative will be considered as unauthorized and no compensation will be made therefor.

1. Remove nonconforming materials from site.

J. Remove rejected work from jobsite.

1. Unless repairs have been made to City's satisfaction, remove Work rejected by City's Representative for failure to comply with Contract Documents within 10 Calendar Days after Written Notice of rejection, whether incorporated in Work or not.

K. Promptly replace and re-execute removed Work in accordance with Contract Documents and without expense to City.

1. Contractor shall bear cost of making good Work of other Contractors destroyed or damaged by such removal or replacement.

Page 1165 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 11 of 12
L. Defective Work or unsuitable materials and/or equipment may be rejected, even though such defective items may have been previously overlooked by City’s Representative.

M. If Contractor fails to remedy, remove, replace, or correct Work under provisions of this section within 10 Calendar Days after receipt of Written Notice, City may remove such Work and store products at Contractor's expense.

1. City shall have authority to cause defective work to be remedied, or removed and replaced, and unauthorized work to be removed by City forces, or otherwise.

2. City shall have authority to deduct costs thereof from monies due or to become due to Contractor, or to bring suit against Contractor and Contractor’s sureties for money damages sustained by City or for specific performance of contractual obligations of Contractor.

END OF SECTION

Page 1166 of 1826 ends

4-20-dp 01 40 00 - Quality Requirements - 12 of 12

THIS PAGE INTENTIONALLY BLANK

Page 1167 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 1 of 8 SECTION 01 50 00

TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL

1.1 Work Included
A. Mobilization, storage yard, temporary utilities, construction aids, barriers and enclosures, security, fire protection, access roads and parking areas, discharge of waters, and temporary controls.

B. Refer to the following sections for Work not covered herein.

1. Section 01 32 23 for construction survey staking.

2. Section 01 35 26 for governmental safety requirements.

3. Section 01 71 13 for mobilization and demobilization requirements.

4. Section 01 74 00 for cleaning and waste management requirements.

5. Section 31 05 50 for requirements to protect existing utilities C. Provide necessary temporary facilities and controls required for execution of Work, including, but not limited to:

1. Storage yard,

2. Temporary utilities,

3. Temporary controls,

4. Construction aids,

5. Security,

6. Fire protection,

7. Parking areas,

8. Storm water BMP’s,

9. Temporary water service,
D. No attempt is made to set out in detail means or methods necessary to satisfy requirements.

1. Recognition of requirements is made to assist Contractor in the identification of necessary costs.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 10 03: Coordination
C. Section 01 22 00: Unit Prices
D. Section 01 32 23: Construction Survey Staking
E. Section 01 33 00: Submittal Procedures
F. Section 01 66 00: Product Storage and Handling Requirements G. Section 01 71 13: Mobilization and Demobilization
H. Section 01 74 00: Cleaning and Waste Management
I. Section 01 77 00: Closeout Procedures
J. Section 31 05 50: Protecting Existing Utilities

1.3 Submittals
A. Furnish the following submittals:

SUBMITTAL DESCRIPTION

MOBILIZATION SUBMITTALS
Construction Facilities
Plan
Submit layout, equipment, materials and procedures proposed for construction of temporary power, telephone, lighting, heating, water, sanitation, field offices and sheds, storm water management, security, dewatering, etc.

Project Signs Submit layout of project signs.

Application for Use of
Recycled Water
Submit application for use of recycled water at time recycled water construction meter is requested

Page 1168 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 2 of 8

SUBMITTAL DESCRIPTION
California Division of
Industrial Safety
Excavation Permit
Submit copy of excavation permit from State Division of Industrial Safety prior to start of excavation.

1.4 Mobilization
A. Obtain temporary easements, which Contractor may require for construction activities outside of existing easements and/or rights-of-way secured by City, at Contractor's expense.

B. Remove obstructions in right-of-way before starting construction.

1. Where private property, such as parked cars, must be removed prior to construction, notify respective property owners 48 hours in advance of right-of-way clearing to allow them to remove their property.

1.5 Temporary Dry Utilities
A. Purchase or generate on-site power for Work where existing outlets are not available.

B. Install temporary lighting when Work is performed at night or under deficient daylight conditions to ensure correct performance, to facilitate inspection, and to meet or exceed OSHA and Cal OSHA mandated lighting levels.

C. Construction telephone shall be available at site at all times Work is in progress.

1. Cellular phones are acceptable.

1.6 Temporary Wet Utilities
A. Use of water utility will be under control of City. Follow requirements and provisions set forth by City regarding use of water.

B. Do not draw water from fire hydrants, except to extinguish fire, without obtaining written permission from City and abiding by conditions set forth by City.

C. Connect to potable water utilities using meters and Division of Drinking Water (DDW) - approved backflow preventers furnished by or acceptable to City.

D. Obtain City-furnished construction water meters and backflow preventers for use of potable water. Water meter and backflow preventer deposit will be waived for City capital improvement projects. Loss or damage to water meter and backflow preventer will be paid by the Contractor from the project retention up to the amounts shown below.

SIZE MAXIMUM CHARGE

FOR METER

REPAIR OR LOSS

MAXIMUM CHARGE FOR

BACKFLOW PREVENTER

REPAIR OR LOSS
3” $800 $2,950
4” $2,053 $3,720
6” $3,388 $5,380
8” $5,173 $9,459
E. Contractor shall pay for potable water used in the prosecution of the Work at the current Business Construction Water use rate per unit (100 cubic feet or 748 gallons).

F. Current potable water rates can be found on the City website at https://www.coronaca.gov/government/departments-divisions/department-of-water-andpower/customer-care/services/business-water-rates.

G. Contractor shall pay a monthly potable water readiness to serve fee used in the prosecution of the Work at the current Business Water rates. Current readiness to serve water rates can be found on the City website at https://www.coronaca.gov/government/departmentsdivisions/department-of-water-and-power/customer-care/services/business-water-rates.

Page 1169 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 3 of 8 H. Contractor shall pay a monthly potable water supply backflow program fee used in the prosecution of the Work at the current Water rate of $6.70. The Current backflow program fee can be found in the Detailed Water Rate Sheet found on the City website at https://www.coronaca.gov/government/departments-divisions/department-of-water-andpower/customer-care/services/business-water-rates.

I. Contractor shall pay a non-refundable installation fee for the processing and installation of construction water meters as follows:

SIZE Non-Refundable
Installation Fee
3” $100
4” $262
6” $386
8” $631
J. If permission is granted to take water through fire hydrants, use one 2½-inch connection for construction water. Reserve remaining outlets for use by fire department. For construction water meters larger than 3-inch, remove the fire hydrant head, install a tee on top of the fire hydrant riser, and reinstall the fire hydrant to maintain the hydrant in service for emergencies while using the hydrant for construction water.

K. Contractor shall, at their expense, arrange to develop water sources, construct temporary piping, valves and appurtenances needed to connect to water utility, and collect, load, transport, and apply water as needed for compaction, testing, concrete work, dust control, and other construction use.

L. Construction water shall be clean and free from objectionable deleterious amounts of acids, alkalis, salts, or organic materials.

M. Use potable water for moisture conditioning of backfill in water pipeline trenches, and flushing of potable waterlines and untreated water pipelines.

N. Provide abundant supply of safe drinking water on jobsite at all times.

O. Post orders against drinking, washing, or bathing in any water in vicinity of Work known to be unsafe.

P. Provide suitable and conveniently located toilets, sanitation, and hand washing facilities for workers, and comply with rules and regulations of State Board of Health and/or other bodies having jurisdiction. Toilets shall be kept supplied with toilet paper and shall have functioning door fasteners.

Q. Leave Contractor-provided toilets and sanitation facilities at site until final inspection has been completed.

R. Do not use public sanitation facilities without written permission.

S. Clean toilets at least once per week until project completion.

T. Do not interrupt water service or wastewater conveyance and disposal without prior written permission from City.

U. Following final inspection remove temporary sanitation facilities and leave site in neat and sanitary condition.

1.7 Access Roads, Parking Areas, and Materials/Equipment Storage Areas A. When entering or leaving roadways carrying public traffic, Contractor’s equipment, whether empty or loaded, shall yield to public traffic.

Page 1170 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 4 of 8 B. Do not block access roads or entrances unless otherwise accepted by City’s Representative.

1. Maintain at least 1-way traffic.

2. Provide signs, traffic cones and other barriers for traffic detours.

C. At discretion of Contractor, contact and negotiate agreement(s) directly with private property owner(s) for use of property for materials and equipment storage areas.

1. Park personal vehicles in materials and equipment storage areas to reduce congestion and traffic impacts on public streets.

D. Access to site for Contractor’s and sub-contractor’s employees, materials, tools, and equipment shall be from Ontario Avenue.

E. Repair damage to off-site and on-site roads in-kind at no cost to City or property owners.

F. Immediately remove spillage resulting from hauling operations along or across public rightof-way.

1. Sweep or wash streets along haul routes daily during hauling operations.

G. Treat access roads and parking areas as needed to control dust and prevent tracking of mud onto paved streets.

H. Refer to Section 01 74 00 for cleaning requirements for access roads.

1.8 Dust Control
A. Dust control operations shall follow applicable air quality regulations and prevent construction dust from harming or annoying persons living in or occupying buildings near Work.

1. Use water or dust preventative to control dust.

2. Cover or wet loads of excavated material, rubbish leaving site, or material being imported to prevent blowing dust.

3. Employ dust control measures to City’s satisfaction throughout project duration.

4. If Contractor fails to control dust, City shall have immediate authority to provide dust control and deduct cost from payments to Contractor.

1.9 Noise Control
A. Noise control shall conform to local noise ordinances and OSHA regulations for acceptable noise exposure.

1. Schedule Work to comply with noise ordinances.

2. Install sound barriers if needed to comply with noise ordinances and Contract Documents.

3. Equip internal combustion engines in vehicles and construction equipment with manufacturer-recommended mufflers.

4. Construct sound attenuation measures around compressors, generators, and other static-engine-driven devices.

5. Do not operate noise-generating construction equipment except during normal working hours unless written permission is obtained from City’s Representative.

6. Back up bells on equipment may only be operated between 7:00 am and 5:00 pm Monday - Friday.

7. Do not use air compressors or operate diesel engine-driven equipment between 5:30 pm and 7:00 am Monday-Friday.

8. Temporary generators will be permitted to operate between 7:00 am and 5:30 pm Monday – Friday providing generator noise level does not exceed 85 dB at 3’.

9. If noise at doorstep of a private residence exceeds allowable noise specified, City may require Contractor to pay each affected household $250 per day to cover expenses of alternative lodging.

B. City desires to maintain courteous relationships with residents adjacent to Work site.

1. Occupied residences or businesses border all sides of project site.

Page 1171 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 5 of 8

2. Prior to construction mobilization, City will prepare and distribute letter to surrounding residents and businesses informing them of pending construction and expected schedule of activities.

3. In support of this, Contractor's employees shall conduct their work in professional manner compatible with residential neighborhood environment.

C. Operation of portable screens and crushers will not be allowed on or adjacent to Work site.

1.10 Fire Protection
A. Minimize fire danger at and near construction site.

B. Protect surrounding private property from fire damage resulting from construction operations.

1.11 Waterway Protection
A. Enforce strict on-site handling rules to keep construction and maintenance materials out of receiving waters, including, but not limited to:

1. Store reserve fuel supplies only within confines of designated construction staging area.

2. Refuel equipment only within designated construction staging area.

3. Regularly inspect construction vehicles for leaks.

B. Clearly mark and stake on ground construction and staging areas shown on Plans.

1. Heavy equipment use outside this area shall be prohibited.

2. Design construction staging areas to contain contaminants such as oil, grease, and fuel products, so they do not drain toward receiving waters or storm drain inlets.

3. If heavy-duty construction equipment is stored overnight adjacent to potential receiving waters, place drip pans beneath machinery engine block and hydraulic systems.

C. Construct silt fence around disturbed soil areas and take measures necessary to prevent erosion and transport of sediment into waterway.

D. Stockpile excavated material within construction staging area.

1. Cover stockpiles with plastic sheets to prevent erosion.

1.12 Protection from Weather
A. Heat and ventilate work areas to protect Work from damage by freezing, high temperatures, weather, and to provide safe environment for workers.

1.13 Vector Control
A. Provide rodent and pest control as necessary to prevent infestation of construction or storage areas.

1. Employ methods and use materials which will not adversely affect conditions at site or on adjoining properties.

1.14 Protection of Personnel and Existing Improvements
A. Refer to Section 01 35 26 for procedures for compliance with governmental safety requirements.

B. In emergency affecting safety of life or of Work or of adjoining property, Contractor, without special instruction or authorization from City’s Representative, is authorized to act to prevent such threatened loss or injury.

1. Contractor shall so act, without appeal, if directed by City or City’s Representative.

2. Compensation claimed by Contractor on account of emergency work shall be determined by and agreed upon by City and Contractor.

C. Manage and arrange operations to minimize public inconvenience and danger.

1. Deliver materials to the Project site over route designated by City’s Representative.

2. Confine Contractor’s equipment, materials, and operations to limits required by law, ordinances, permits, or directions of City’s Representative.

Page 1172 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 6 of 8 a. Do not unreasonably encumber Work site with Contractor’s equipment or materials.

3. Repair damage to existing improvements caused by Contractor’s operations. a. At completion of work each day, leave Work site in clean, safe condition. b. Upon completion of Work, restore damaged facilities to condition acceptable to City.

D. Should damage to persons or property occur as a result of Work, Contractor shall be responsible for proper investigation, documentation, including video or photography, to memorialize and document what transpired.

1. City shall be entitled to inspect and copy such documentation, video, or photographs.

E. Refer to Section 01 66 00 for measures to protect Work, materials, equipment, appliances, and tools against damage by environmental conditions.

F. Prevent damage to property resulting from Contractor’s operations.

1. Care for and protect materials delivered and Work performed until Final Acceptance by City.

2. All Work shall be solely at Contractor’s risk.

3. Protect adjacent property from settlement or loss of lateral support.

4. Erect and maintain, as required by field conditions and progress of Work, all necessary safeguards, signs, barriers, lights, and watchmen for protection of workers and public. a. Post danger signs warning against hazards created in course of construction.

G. Prevent injury or damage to existing improvements and property, including:

1. Sidewalks, curbs, gutters, pavements,

2. Landscaping, trees, shrubbery, and groundcovers

3. Structures, vaults, enclosures, buildings,

4. Fences, signage, traffic signals, utility poles

5. Monuments, property corners, benchmarks

6. Underground pipe and conduit

7. Historical or archeological artifacts

8. Human remains that are not to be moved.

9. Precautionary measures shall apply continuously and not be limited to normal working hours.

10. If such objects, or improvements, are injured or damaged by Contractor's operations, they shall be replaced or restored, at Contractor's expense, to condition at least equal to that prior to mobilization.

H. Protect landscaping, vegetation, and irrigation facilities as follows:

1. During progress of construction take proper precautions to prevent damage to trees, plants, and shrubs.

2. Do not pile excavated material, equipment, construction materials, or anything else on top of branches or against tree trunks.

3. Notify Owner of potential impacts to protected trees or plants, and do not damage, move or otherwise harm said tree or plant prior to investigation and direction from Owner. a. Costs associated with damage to protected trees or plants shall be sole responsibility of Contractor.

4. Protect, or replace in kind, at no additional cost to Owner, existing irrigation and landscape facilities affected by Work.
a. Irrigation system record drawing information is typically missing or incomplete. b. Therefore, Contract Documents do not show details of existing irrigation system. c. Locate irrigation piping, spray heads, control wiring, and controllers and modify components of irrigation system during progress of Work to continue irrigating existing landscaping and vegetation as necessary to maintain health of existing plants, trees, and vegetation.

I. Refer to Section 31 05 50 for procedures to protect existing utilities.

J. Refer to Section 01 32 23 for procedures to protect monuments, survey markers, and benchmarks:

Page 1173 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 7 of 8

1.15 Site Security
A. Safely guard Work, materials, equipment and property from loss, theft, damage and vandalism.

1. Project site is subject to vandalism.

2. Contractor's duty to safely guard property shall include protecting City's property and other private property from injury or loss in connection with performance of Contract.

3. If existing fencing or barriers are breached or removed for purposes of construction, provide and maintain temporary security fencing equal to existing in manner satisfactory to City.

4. Provide temporary fencing around construction staging area.

5. Fence temporary openings when openings are no longer necessary. a. During night hours, weekends, holidays, and other times when no Work is performed at site, provide temporary closures or enlist services of security guards to protect temporary openings.
b. Bear responsibility for protecting plant and material on site of Work when openings are not closed.

6. Upon completion of each day’s work, leave Work area secure and free of hazards.

7. Provide necessary temporary signs, warning devices, chain link fences, and barricades.

8. Protect temporary and permanent fence, gate, and driveway openings to prevent intrusion by unauthorized persons.

B. Employ security staff as needed to provide required security and prevent unauthorized entry.

1. Contractor shall compensate damage to property of City and others arising from failure to provide adequate security.

C. Make no claim against City for damage resulting from trespass.

1. City is not responsible for items lost, damaged, or stolen from construction or storage areas or for injuries to public due to unsafe conditions.

D. Provide temporary access to adjacent properties during non-construction hours.

E. Install and maintain for duration of construction remotely monitored site surveillance system to include video cameras mounted on temporary poles.

1. Install surveillance system to provide full video surveillance of site with connection to monitoring station where police can be notified when unauthorized activity occurs.

2. Remove surveillance system following notice of substantial completion.

F. Maintain security program throughout construction until City's acceptance and occupancy precludes need for Contractor's security program.

G. Costs for security as specified in this Section shall be borne by Contractor.

1.16 Existing Conditions
A. Nothing in this section shall relieve Contractor of responsibility to:

1. Fully examine Contract Documents and site where Work is to be performed in accordance with General Conditions

2. Be familiar with local conditions and federal, state, and local laws, rules and regulations that may affect performance of Work

3. Study available surveys and investigative reports about subsurface and latent physical conditions pertaining to worksite

4. Perform such additional surveys and investigations as Contractor deems necessary to complete Work at bid price; and

5. Correlate results of such data with requirements of Contract Documents.

B. If dispute arises between City and Contractor involving hazardous waste and whether site conditions differ materially from those Contractor could or should have discovered by investigations required by these Contract Documents, Contractor shall not be excused from

Page 1174 of 1826 ends

4-20-dp 01 50 00 – Construction Facilities and Temporary Controls - 8 of 8 scheduled completion date provided in Contract Documents and shall proceed with Work in manner and in time required by Contract Documents.

1.17 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

1.18 Unit Prices
A. Refer to Section 01 22 00 for measurement and payment clauses for temporary facilities and controls.

PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION (not used)

END OF SECTION

Page 1175 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 1 of 8 5-17-vw
SECTION 01 63 00

PRODUCT SUBSTITUTION PROCEDURES
PART 1 - GENERAL

1.1 Scope
A. Acceptable manufacturers, accepted alternates, and procedures for seeking product substitutions.

1.2 Related Work
A. Section 01 33 00: Submittal Procedures

1.3 General Requirements
A. Pursuant to California Public Contract Code §3400, Deadline for receipt of Substitution Requests shall expire at 5:00 P.M. Pacific Standard Time, 7 calendar days before date of bid opening published in Notice Inviting Bids.

B. Standard Products - Where products are specified by reference standard, any product meeting the standards referenced may be used. Submit information on such products in accordance with the requirements of Section 01 33 00.

C. Proprietary Products – Where products or processes are specified by trade, patent or proprietary name, said specification, unless marked "no exceptions", or “City standard – no exceptions”, shall be deemed to be followed by the words "or accepted equal accepted in writing by City’s Representative." In such case substitution of similar products as “accepted equals” will be considered under this section.

D. Selection of Proprietary Product - Where more than one proprietary name is specified, Contractor may provide any one of the products specified.

E. Use only one manufacturer for each specific application throughout the Work notwithstanding that similar materials or equipment of two or more manufacturers or producers may be specified for the same application.

F. Systems of Like Manufacture - Where products are specified in groups to be furnished by one Manufacturer, no substitution will be considered that is not similarly furnished by one Manufacturer. Where Contractor proposes to use a system of equipment other than that shown in the Contract Documents, propose the substitution as a complete system.

G. Substitution Request Procedure Before Bid Opening - Submit written request on enclosed form for proposed substitutions to City Representative prior to deadline for receipt of substitution requests. Submit proposed substitutions relating to a particular subcontract or trade in one package. If City accepts any proposed substitutions, such acceptance will be set forth by addendum. No substitution will be considered after deadline for receipt of substitution requests has expired unless accompanied by an offer of savings to City.

H. Substitution Request Procedure After Bid Opening – City will only consider substitutions after bid opening if accompanied by an offer of savings to City in excess of $1,000. Submit written request on enclosed form to City’s Representative.

Submit proposed substitutions relating to a particular subcontract or trade in one package. If City accepts any proposed substitutions, such acceptance will be set forth by change order.

I. Contractor's Responsibility for Construction Modifications - Drawings have been detailed in compliance with dimensions and International Council of Building

Page 1176 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 2 of 8 5-17-vw
Officials (ICBO) Evaluation Report data for products specified. If proposed substitute product is accepted by City’s Representative, Contractor shall assume both responsibility for construction modifications and additional costs required by reason of this acceptance. If substitution results in a decrease in cost, potential savings to City may be submitted to City’s Representative for consideration.

J. No time extension will be allowed for substitution of materials.

1.4 Standardization of Equipment and Certain Materials
A. Pursuant to Public Contracting Code §3400, the City may make findings designating certain “sole source” materials, products, things or services provided by specific brand or trade name for statutorily enumerated purposes.

B. Public Contracting Code §3400 is very often inapplicable to maintenance and construction projects performed by the City Department of Water and Power (DWP) on its water and wastewater utility systems.

C. When Public Contracting Code §3400 is inapplicable, the City’s general police powers authorize it to specify “sole source” equipment and products for a variety of reasons, including, but not limited to, the City’s need to establish uniform, complete and compatible equipment and product specifications, in order to help establish reliability, durability, uniformity, parts availability, repair and maintenance savings, and training improvements for the DWP staff.

D. Resolution No. 2013-057 adopted by the City on June 19, 2013 designated certain equipment and product specifications for construction of potable water, water reclamation and reclaimed water facilities.

E. Resolution No. 2013-057 gave authority to the DWP General Manager to review the adopted Specifications from time-to-time and to amend the Specifications upon making any findings required by applicable law.

F. Systems of Like Manufacture - To ensure standardization and uniformity in all parts of Work and to provide City with inter-changeability capabilities, simplified spare parts inventory, and standardized maintenance programs and Manufacturers' services, where products are specified in groups to be furnished by one Manufacturer, no substitution will be considered not similarly furnished by one Manufacturer. Where Contractor proposes to use system of equipment other than that shown in Contract Documents, substitution shall be proposed as complete system.

G. Material items exempt from standardization include structural steel, reinforcing steel, fasteners and bolting materials, building insulation, sheet metal, materials specified only by reference to recognized standard, and items hidden from view where interchangeability, color, and texture is no significant factor for standardization.

H. Contractor shall inform their suppliers and subcontractors of these requirements and shall provide necessary coordination to accomplish standardization specified.

I. Pursuant to California Public Contract Code §3400(b), City reserves right to reject product substitutions (1) on the basis of maintenance of economies of scale available to City through standardizing of Manufacturers and minimizing spare parts inventories, or (2) if City has provided in Invitation for Bids that the product is necessary to (i) field test or experiment to determine the product’s suitability for future use, (ii) match other products in use on a completed public improvement or one in the course of completion, (iii) obtain a necessary item only available from one source, or (iv) respond to an emergency declared in accordance with requirements of California Public Contract Code §3400(c)(4).

Page 1177 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 3 of 8 5-17-vw

1.5 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
Substitution Request Form Submit Substitution Request on form furnished below.

Contractor’s Certification of
Performance and
Assumption of Liability
Submit Certificate of Performance certifying that the proposed substitution is equal to or better in all respects to the product specified and that the proposed substitution will, in all respects perform the function for which it is intended.

Certificate of Compliance Required as needed to substantiate Product Substitutions Dimensional Data Required for Product Substitutions
Material Samples Required as needed to substantiate Product Substitutions Foundry or Test Record
Transcripts
Required as needed to substantiate Product Substitutions Material List and Ratings Required as needed to substantiate Product Substitutions Names and Addresses of
Nearest Local
Manufacturer’s
Representatives
Required for Product Substitutions (Use allotted space on attached Substitution Request Form)
List of Three Local Product
Installations
Names and contact information for three installations within 100-mile radius of project completed in prior three years. Required for Product Substitutions (Use allotted space on attached Substitution Request Form)
Manufacturer’s Service
Contract Statement of
Qualifications
Required for installations of products that include optional maintenance service contracts.

Warranty Furnish warranty equal to or better than warranty required for specified product.

B. Determination of Equality - Burden of proof of equality of substituted item shall be on Contractor. Acceptance of such substitutions is entirely at City’s discretion.

C. List of Accepted Substitutions - City will issue to bidders by addendum a list setting forth accepted substitutions. No products proposed for substitution, shall be ordered before being accepted in writing by City’s Representative.

D. Products accepted as "accepted equals" shall, in City's opinion, meet the following requirements:

1. Products shall be of equal quality, substance and function to those listed.

2. Architectural finishes and colors of accepted equals shall, in City’s opinion be compatible with existing finishes and colors.

3. Products shall be standard products of a reputable Manufacturer having regularly been engaged for 5 years in manufacture of products furnished.

4. Products shall have a reputation for assuring long-lasting trouble-free service.

5. Factory-authorized, factory-trained and competent service personnel and stocked service parts shall be available within a 150-mile radius of Work.

6. Manufacturer shall be capable of certifying compliance with listed reference standards.

E. Denial of Substitution - If, in City’s opinion, proposed substitution is not equal to or better in every material respect to specified product or was not submitted for acceptance in manner outlined above, Contractor shall furnish products specified.

F. Responsibility for Coordinating Substitutions with Construction Trades – Inform all other trades, vendors, and subcontractors of effects of substitutions on their Work or products. Failure to notify shall not relieve Contractor of their duty to make

Page 1178 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 4 of 8 5-17-vw
payments arising from alterations in specified products or methods needed to complete Work in acceptable manner.

1.6 Contractor's Responsibility for Cost of Substitution Reviews A. Pay all costs incurred by City’s Representative and City to review Requests for Substitutions.

1.7 Bid Shopping and Reverse Auctions
A. Substitutions for products and services of manufacturers or subcontractors listed at time of bid and/or in Contractor’s initial Submittal will only be permitted under one or more of the following circumstances:

1. Where Contractor offers a credit to City sufficient in City’s opinion to justify accepting substitution by Change Order.

2. Where Contractor-listed manufacturer or subcontractor has gone out of business.

3. Where Contractor-listed manufacturer or subcontractor has, in City’s opinion, failed to perform or no longer possesses both capability and willingness to perform to standard required by Contract Documents.

4. With respect to subcontractors listed at time of bid, substitution is for a circumstance permitted by California Public Code Section 4107.

PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION (not used)
PART 4 – SAMPLE FORMS

Page 1179 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 5 of 8 5-17-vw

SUBSTITUTION REQUEST FORM
TO: City of Corona, Utilities- Water Operations

755 Public Safety Way
Corona, CA 92880
PROJECT NAME: _____________________________________________________________ FROM CONTRACTOR: ________________________________________________________ We hereby submit for consideration the following product substitution of specified item for above project:

DRAWING OR SHEET NUMBER
SECTION NO. OR PARAGRAPH SPECIFIED ITEM
____________ _______________ ___________________________________ ____________ _______________ ___________________________________ ____________ _______________ ___________________________________ ____________ _______________ ___________________________________ PROPOSED SUBSTITUTION:____________________________________________________ Attach a brief description of the reason for proposed substitution.

Attach complete dimensional information and technical data needed to substantiate product substitution, including ICBO reports and laboratory tests, if applicable.

Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation.

Where product substitutions are proposed at multiple locations, submit copies of plans showing in red each location where the product substitution is proposed.

Submit with request all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Differences in quality of materials and construction shall be indicated.

Submit Manufacturer’s Statement of Responsibility.

Page 1 of 3 ends
Page 1180 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 6 of 8 5-17-vw

SUBSTITUTION REQUEST FORM
Fill in Blanks Below:

A. Does the substitution affect dimensions shown on Drawings? Yes No If yes, attach copy of plans and clearly indicate changes.

B. Will the undersigned pay for the changes to the building design, including engineering, detailing and review costs caused by the requested substitution? Yes No ___
C. What effect does the substitution have on other trades?

1._________________________________________________________________

2. _________________________________________________________________

3. _________________________________________________________________ D. What effect does substitution have on applicable code requirements?

1._________________________________________________________________

2. _________________________________________________________________

3. _________________________________________________________________ E. What is the ICBO Approval Number? ____________________________________ F. Differences between proposed substitution and specified item:

1._________________________________________________________________

2. _________________________________________________________________

3. _________________________________________________________________ G. List three installations where product is in use:

1._________________________________________________________________

2. _________________________________________________________________

3. _________________________________________________________________ H. Address of Authorized Manufacturer’s Representative:
__________________________________________________________ Representative
__________________________________________________________ Address
__________________________________________________________ City/State/Zip Code
I. Manufacturer's guarantees of the proposed and specified items are:

Same Different (Explain) _______________________________________ ___________________________________________________________________ J. City’s share of cost savings, if substitution is approved $____________________

Page 2 of 3 ends
Page 1181 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 7 of 8 5-17-vw

SUBSTITUTION REQUEST FORM

CONTRACTOR'S CERTIFICATION OF PERFORMANCE AND ASSUMPTION OF LIABILITY

FOR EQUAL PERFORMANCE
I certify that the proposed substitution is equal to
or better in all respects to the product specified
and that the proposed substitution will, in all
respects, perform the function for which it is
intended.

Submitted By:

Signature Title
Firm
Address
Telephone Date
For use by Design Engineer:

Accepted
Accepted as Noted
Not Accepted
Received Too Late
By
Date
Remarks
Concurrence By:

City
Signature must be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval.

Page 3 of 3 ends

END OF SECTION

Page 1182 of 1826 ends

01 63 00 – Product Substitution Procedures - Page 8 of 8 5-17-vw

THIS PAGE INTENTIONALLY BLANK

Page 1183 of 1826 ends

01 66 00 – Product Storage and Handling Requirements - Page 1 of 4 9-16-vw
SECTION 01 66 00

PRODUCT STORAGE AND HANDLING REQUIREMENTS
PART 1 - GENERAL

1.1 Work Included
A. Handling, storage and protection of products.

1.2 Related Work
A. Section 01 33 00: Submittal Procedures
B. Section 01 40 00: Quality Requirements
C. Section 01 61 00: Common Product Requirements
D. Section 01 65 00: Product Delivery Requirements

1.3 References
A. ANSI/NSF 60 Drinking Water Treatment Chemicals – Health Effects B. ANSI/NSF 61 Drinking Water System Components – Health Effects

1.4 Storage and Handling
A. Store products at jobsite as follows:

1. Contractor shall be responsible for damage or loss to products until Final Acceptance.

2. Store materials per Manufacturer’s recommendations, and in protected area at temperature between 35°F and 110°F.

3. Store products so as to preserve their quality and fitness for Work.

4. Locate stored products and equipment to be incorporated in Work to facilitate prompt inspection.

5. Inspect products periodically to assure products are undamaged and are maintained under required conditions. Maintain log of inspections and make available upon request.

6. Store products with seals and labels intact and legible.

7. Protect products against moisture, weather, temperature extremes, dust, debris, tampering, theft, vandalism, ultraviolet radiation, or damage from improper handling, storage, or exposure.

8. Protect exposed metals from rust and corrosion, even for items that may be sandblasted or otherwise cleaned before painting.

9. Ventilate materials subject to corrosion or moisture damage to prevent condensation.

10. Any corrosion in evidence prior to final acceptance shall be removed, or product shall be removed or replaced.

11. Store items not designed for outdoor exposure off-ground and under cover.

12. Store aggregate in well-drained area to minimize change in moisture content.

Prevent contamination by other materials.

13. Store cementitious materials in weather-tight spaces. Keep free from moisture.

Page 1184 of 1826 ends

01 66 00 – Product Storage and Handling Requirements - Page 2 of 4 9-16-vw

14. Store fasteners and connectors in original unopened containers until used.

15. Cover stored materials with tarpaulin or other covering to prevent soiling or exposure to weather. Fasten coverings to prevent removal by wind.

16. Cover plastic and similar brittle items to protect from sun exposure and temperature extremes.

17. Store flammable products to conform with City, County, State, and Federal safety codes for storage of flammable materials.

18. Within three working days following pipe delivery, remove the pipe end covers, swab the entire pipe interior with a bleach solution, replace pipe end covers, and securely wrap the plastic and tape. Retain pipe end covers and plastic wrap covering on pipe until pipe is installed in trench.

19. Cover, plug, or cap pipe ends, valve ends, and equipment openings with rubber, plastic, or canvas to prevent intrusion or contamination at all times when installation is not in progress. These provisions shall apply during noon hour as well as overnight.

20. String pipe along right of way in manner that will not interfere with free passage of vehicles.

21. Do not store pipe on roadway or parkway of streets.

22. Do not use pipeline as drain for removing water that has infiltrated into trench.

Maintain inside of pipe free from foreign materials and in a clean and sanitary condition until final acceptance.

23. Store items in accordance with requirements of project Storm Water Pollution Prevention Plan (SWPPP), if applicable. If no SWPPP has been prepared for project, store items in accordance with appropriate best management practices (BMP’s) listed in California Stormwater Quality Association (CASQA) Stormwater Best Management Practice Handbook for Construction latest edition. Comply with all City, County, State and Federal pollution prevention laws and permits.

24. Between delivery and installation, store all equipment to be incorporated into Work in manner to prevent damage or deterioration. Provide environmental controls, such as heaters or protective encapsulation, to guard against condensation and moisture damage.

25. Motor space heaters shall be operational at all times when motors are stored on site.

26. If prolonged (more than 90 days) storage is required for any item of rotating equipment, institute preventive maintenance program to include grease protection of bare metal surfaces, periodic indexing of rotating parts, renewal of grease in bearings and any procedures recommended by Manufacturer. Maintain records to demonstrate full compliance with these requirements.

27. To ensure adequate protection of all electrical and instrumentation equipment and panels and electric motors, store all such equipment in suitable enclosure designed to protect equipment from dust and moisture. Maintain storage facilities and stored equipment, providing all utilities required.

28. Notify City in writing if delivered or stored product is damaged. Exterior surfaces of delivered items shall be in perfect unblemished condition. Do not repair damaged products without prior written approval.

29. During the interval between delivery and installation, store all equipment to be incorporated into the Project in a manner to prevent damage or deterioration.

Page 1185 of 1826 ends

01 66 00 – Product Storage and Handling Requirements - Page 3 of 4 9-16-vw
Provide environmental controls, such as heaters or protective encapsulation, to ensure against condensation and moisture damage. Motor space heaters shall be operational at all times when motors are stored on site. In the event prolonged (more than 90 days) storage is required for any item of rotative equipment, institute a preventive maintenance program that shall include grease protection of bare metal surfaces, periodic indexing of rotating parts, renewal of grease in bearings and any procedures recommended by the manufacturer.

Maintain adequate records to demonstrate full compliance with these requirements. Make all equipment available for inspection by the City.

30. To ensure adequate protection of all electrical and instrumentation equipment and panels and electric motors, store all such equipment in a suitable enclosure designed to protect the equipment from dust and moisture. The Contractor shall be responsible for maintaining the storage facilities and equipment stored therein and making provisions for all utilities required. Provide continuous access to the City for all equipment so stored.

B. Handle products as follows:

1. Handle products with care, using proper equipment according to Manufacturer's recommendations.

2. Provide equipment and personnel to handle products, materials, and equipment by methods to prevent soiling and damage.

3. Provide protection during handling to prevent marring and otherwise damaging products, packaging, and surrounding surfaces.

4. Lift large heavy items only at points designated by Manufacturer. Do not drop, drag, bump, bend or handle products in manner that causes abrasions, bruises, cracks, mars, scars, scratches, or other damage. Use padded slings and hooks for lifting as needed to prevent damage. Improper handling shall be cause to reject mishandled products.

5. Use rubber or canvas belt slings or pneumatic-tired cradles to lift or lower coated pipe, valves and other products. Sling width shall equal or exceed pipe or product diameter. Do not handle coated products using ropes, hooks, chains, calipers or cables. Store such materials on padded skids.

6. Inspect each product item for damage, defects, completeness and correct operation before installing.

7. Notify City in writing if delivered or stored product is damaged. Do not repair damaged products without prior written acceptance.

8. Before installation, swab joints and interiors of piping materials to remove foreign matter and contaminants.

9. Clean and protect machined surfaces and shafting from corrosion using proper type and amount of coating as described in Manufacturer’s warranty requirements to assure protection to one year after final acceptance.

10. Maintain records for City's review of deliveries to show Contractor's order number, purchase order number, and equipment number. Include labeling or shipping tag in records.

1.5 Unit Prices
A. Payment for the Work in this section shall be included as part of the lump-sum or unit-price bid amount for which such Work is appurtenant.

Page 1186 of 1826 ends

01 66 00 – Product Storage and Handling Requirements - Page 4 of 4 9-16-vw
PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION

3.1 Warranty Requirements
A. Strictly follow manufacturer’s instruction and warranty requirements for storage and handling of products.

END OF SECTION

Page 1187 of 1826 ends

01 71 13 – Mobilization and Demobilization 1 of 4
5-17-vw
SECTION 01 71 13

MOBILIZATION AND DEMOBILIZATION
PART 1 - GENERAL

1.1 Work Included
A. Mobilization shall include:

1. Provide bonds and insurance.

2. Obtain required permits.

3. Provide preconstruction photos and videos

4. Prepare and update project schedule

5. Provide project sign(s).

6. Construct and remove temporary traffic control facilities.

7. Locate existing utilities.

8. Construct and remove temporary utilities (construction power, wiring, and lighting).

9. Obtain temporary easements Contractor may require for construction activities outside of existing easements and/or rights of way secured by City.

10. Install and remove temporary fence.

11. Perform required surveys, testing, site maintenance, and cleanup.

12. Move onto the site of all Contractors' plant, tools, material, equipment, and temporary buildings required for construction operations.

13. Provide and maintain storage facilities required for temporary storage of products, equipment, and materials.

14. Provide site security and monitoring systems.

15. Establish fire protection system.

16. Develop construction water supply as required.

17. Provide field office trailer for the Contractor (at Contractor's option)

18. Provide field office trailer (for City’s use)

19. Provide on-site sanitary facilities and potable water facilities for Contractor’s personnel.

20. Arrange for and establish Contractor's storage yard as required. (Contractor is solely responsible for obtaining property owner agreements to use private property for storage or laydown areas per the Contract Documents.)

21. Possess all OSHA required notices and establishment of safety programs.

22. Submit initial submittals.

23. Implement stormwater pollution control best management practices.

24. Arrange for and establish traffic control.

B. Mobilization will be deemed complete when all items necessary to conduct field operations are on site and operable.

C. When using vacant property to park, service and store products, obtain approval from City’s Representative. Notify adjacent property owners in writing of this proposed use at least 7 calendar days prior to use. Obtain written acceptance from property owner

Page 1188 of 1826 ends

01 71 13 – Mobilization and Demobilization 2 of 4
5-17-vw
stating conditions of their approval. Conform to setbacks and other conditions required by City or County regulations or permits.

D. Remove obstructions in right-of-way before starting construction. Where private property, such as parked cars, must be removed prior to construction, notify respective property owners 72 hours in advance of right-of-way clearing to allow them to remove their property.

E. Remove temporary structures and controls before inspection for Final Completion or when directed. Clean and repair damage caused by installation or use of temporary facilities and controls. Restore existing facilities used during construction to specified or original condition.

1.2 Related Work
A. Section 01 04 00: Coordination
B. Section 01 29 73: Schedule of Values
C. Section 01 32 33: Construction Photographic and Video Documentation D. Section 01 33 00: Submittal Procedures
E. Section 01 50 00: Temporary Facilities and Controls
F. Section 01 74 00: Cleaning and Waste Management
G. Section 01 77 00: Closeout Procedures

1.3 Submittals
A. Furnish the following submittals:

SUBMITTAL DESCRIPTION
Storage Yard Refer to Section 01 50 00.

Project Signs Refer to Section 01 50 00.

Construction Facilities Plan Refer to Section 01 50 00.

B. The Contractor's site office and other construction facilities shall be of a temporary nature.

C. Contractor shall be wholly responsible for the security of his site office and laydown area, and for all its plant, materials, equipment and tools at all times.

1.4 Demobilization
A. At the completion of the project, perform the following activities:

1. Remove all equipment, materials, and temporary facilities installed during mobilization and construction phases of the work.

2. Remove and properly dispose of all excess or waste materials, debris, rubbish, and temporary facilities from the site, structures and all facilities.

3. Repair pavement, roads, landscaping, and all other areas affected by construction operations and restore them to original condition or to a minimum condition specified.

4. Remove spatter, grease, stains, fingerprints, direct, dust, labels, tags, packing materials, and other foreign items or substances from interior and exterior surfaces, equipment, signs, and lettering.

5. Repair, patch, and touch up chipped, scratched, dented or otherwise marred surfaces to match specified finish.

Page 1189 of 1826 ends

01 71 13 – Mobilization and Demobilization 3 of 4
5-17-vw

6. Remove paint, clean and restore all equipment and material nameplates, labels and other identification markings.

7. Clean all slabs, pavements and ground surfaces.

8. Restore site to its original condition. Demobilization and site restoration at a developed site will include, but not be limited to, regrading of the ground surface disturbed during mobilization and construction; reconstruction of fences, walls, berms, drains, or other surface features; sweeping of paved areas; repair or replacement of damaged asphalt pavement; concrete roadways, slabs, driveways, driveway entrances, curbs, gutters and sidewalks; and replacement of bushes, trees, or ground cover, which were present prior to commencement of work.

1.5 Unit Prices
A. Payment for mobilization, demobilization, including payment for construction, modification, maintenance, removal and restoration associated with access, and storage facilities, will be included in the lump sum bid price for Mobilization/Demobilization.

PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION
A. Refer to Section 01 32 33 for preconstruction and construction photographic and video documentation requirements.

END OF SECTION

Page 1190 of 1826 ends

01 71 13 – Mobilization and Demobilization 4 of 4
5-17-vw

THIS PAGE INTENTIONALLY BLANK

Page 1191 of 1826 ends

01 73 00 – Execution - Page 1 of 4
3-17-vw
SECTION 01 73 00

EXECUTION
PART 1 - GENERAL

1.1 Work Included
A. Examination of site before bidding, preparation for construction, and execution of Work.

1.2 Related Work
A. Section 01 32 33: Construction Photographic and Video Documentation B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 65 00: Product Delivery Requirements
E. Section 01 66 00: Product Storage and Handling Requirements F. Section 01 71 13: Mobilization and Demobilization
G. Section 01 74 00: Cleaning and Waste Management
H. Section 01 75 00: Equipment Commissioning and Facility Startup I. Section 01 77 00: Closeout Procedures
J. Section 01 78 39: Project Record Documents
K. Section 02 41 13: Selective Site Demolition
L. Section 31 12 16: Paving Conforming to Greenbook Specifications M. Section 31 05 50: Protecting Existing Utilities
N. Section 33 30 31: PVC Gravity Sewer

1.3 Project/Site Conditions
A. Ascertain suitability of native soil for backfill before submitting bid. If native soil is found to be unsuitable, provide suitable material for meeting compaction requirements at no additional cost to City.

B. Items furnished shall be capable of fulfilling their intended purpose in environment in which they are installed. Allow for local temperature extremes, climactic conditions and corrosive environments where necessary to ensure proper functioning of furnished products.

C. The action of beginning installation, application or erection of any product shall be deemed sufficient evidence that both the Contractor and the installer accept existing field conditions as acceptable for installation, application or erection of that product, except where written notice is given of Contractor or installer’s concerns before starting applicable work.

1.1 References
A. ASME/ANSI B31.3 Process Piping Design
B. AWWA C105 / ANSI A21.5 Polyethylene Encasement for Ductile-Iron Pipe Systems C. Reference Specifications listed under the various sections of these Contract Documents form a part of the Contract Documents only to extent they are referenced.

Page 1192 of 1826 ends

01 73 00 – Execution - Page 2 of 4
3-17-vw

1.4 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid for which such Work is appurtenant. No additional payment will be made for Work in this Section.

PART 2 - PRODUCTS

2.1 Materials
A. Refer to Section 33 30 31 for pipe materials.

B. Unless otherwise specified, furnish and install Type 316 stainless steel nuts, bolts, and washers on all bolted connections.

C. Liberally apply anti-seize thread lubricant to the threaded portion of all stainless steel bolts during assembly.

D. Dissimilar metals, when used in conjunction with each other shall have suitable insulation provided between adjoining surfaces to eliminate direct contact and resultant current. Insulation shall be bituminous impregnated felt, heavy bituminous coatings, nonmetallic separators, washers, or other accepted materials.

2.2 Equipment
A. Furnish special tools, wrenches and appliances needed to adjust, operate, maintain or repair mechanical equipment supplied.

PART 3 - EXECUTION

3.1 Preparation
A. Contractor represents they have carefully examined Contract Documents and site where Work is to be performed and they have familiarized themselves with all local conditions and federal, state, and local laws, ordinances, rules, and regulations that may affect in any manner the performance of Work.

B. Refer to Section 01 32 33 for preconstruction and construction photographic and video documentation requirements.

C. Refer to Section 01 65 00 for requirements to verify field dimensions, utility locations, and electrical compatibility before shipping products.

D. Carefully lay out work in advance to minimize cutting, channeling, chasing or drilling of structural pads or elements. Review in advance with City’s Representative all cuts, channeling, drilling, or welding required to accommodate mechanical or electrical equipment. Do not begin such work until notified by City’s Representative. Repair damage to structures, piping equipment or finishes using skilled workers of appropriate trades.

E. Relocations or adjustment of existing facilities needed to facilitate construction must be accepted in writing by City’s Representative and subsequently relocated or adjusted by Contractor as directed. If existing items are lost or damaged during construction, replace with new items of equal or better quality.

F. Trimming of existing tree branches and roots required to accommodate construction activities shall be done under direction of certified arborist.

Page 1193 of 1826 ends

01 73 00 – Execution - Page 3 of 4
3-17-vw
G. Make field measurements needed to fabricate and install Work before ordering or beginning work. Make minor changes in alignments and dimensions as needed to remedy or avoid utilities and structural conflicts.

H. Material safety data sheets (MSDS) shall be available and maintained at Project site.

3.2 Installation / Application / Erection
A. Maintain complete set of Contract Documents including shop drawings at jobsite field office or superintendent's truck at all times.

B. Refer conflicts between Manufacturer's installation instructions and Contract Documents to City's Representative. Additional costs incurred by Contractor resulting from City’s Representative's direction in resolving installation instruction conflicts will be reimbursed as Extra Work. Costs incurred by Contractor, through failure to timely notify City’s Representative of a conflict, shall be borne by Contractor.

C. Install products at locations shown on Plans and submittals.

D. Unless otherwise shown, install all equipment on concrete bases at least 6 inches high. Anchor baseplates to the concrete base with epoxy grouted anchor bolts. For equipment with grouted bases, fill the space beneath with grout as specified. Grout the equipment base after initial fitting and alignment.

E. Before welding, abutting joints shall be free of strain.

F. Prime and paint exposed surfaces of copper, brass, and bronze piping. Clean painted surfaces and touch up bare or marred spots with finish to match factory finish.

G. Paint and coat in workmanlike manner so as to produce an even film of uniform thickness. Pay attention to edges, angles, flanges, corners, crevices, and joints to ensure that they have been thoroughly cleaned and that they receive specified thickness of paint or coating. Finished surfaces shall be free from runs, drops, ridges, waves, shiners, laps, brush marks, and variations in color, texture and finish. The hiding shall be so complete that addition of another coat would not increase the hiding. Apply coats so as to produce film of uniform thickness.

H. Do not force-fit or spring pipe, conduit or equipment into place. Corrective measures for cases of poor alignment shall be accepted in advance by City's Representative.

I. Deflections at joints shall fall within Manufacturers' published tolerance limits.

J. Mitered piping joints are not permitted.

K. Pipe bends shall conform to ASME B31.3 and be free from wrinkles, creases or corrugations.

L. Pipe bends shall use accepted AWWA fittings, except that API standard fittings may be used for above-ground steel pipe.

M. Cut pipe threads with sharp dies and make up joints with accepted thread sealing compound. Threads to be seal-welded shall be made up dry. Do not use Teflon sealers.

N. Epoxy coated pipe, valves and fittings shall be fabricated and installed without cutting, notching or welding.

O. Install valves and equipment to facilitate easy operation and servicing. Where geometry of manufactured valves and equipment and field conditions make it difficult

Page 1194 of 1826 ends

01 73 00 – Execution - Page 4 of 4
3-17-vw
or impossible for average worker to operate or service an installed item, notify City’s Representative of conflict before installing item.

P. Unless otherwise shown, encase buried valves and ductile iron pipe and fittings in two layers of 8-mil polyethylene wrap in accordance with ANSI A21.5 and AWWA C105.

Q. Install Type 316 stainless steel nuts, bolts, and washers on all installations.

R. Liberally apply anti-seize thread lubricant to the threaded portion of all stainless steel bolts during assembly.

3.3 Salvage and Removals
A. Refer to Section 02 41 13 and drawings for selective site demolition.

END OF SECTION

Page 1195 of 1826 ends

01 74 00 – Cleaning and Waste Management - Page 1 of 6
12-17-vw
SECTION 01 74 00

CLEANING AND WASTE MANAGEMENT
PART 1 - GENERAL

1.1 Work Included
A. Cleaning during construction, final cleaning on completion of Work and disposal of waste.

1.2 Related Work
A. Section 01 33 00: Submittal Procedures
B. Section 01 35 44: Environmental Procedures for Hazardous Materials C. Section 01 50 00: Temporary Facilities and Controls
D. Section 02 41 13: Selective Site Demolition

1.3 Submittals
A. Furnish the following submittals

SUBMITTAL DESCRIPTION
Dust Control Plan See Paragraph 1.4 below

1.4 Air Pollution Control
A. Comply with all laws, ordinances, rules, regulations, and orders pertaining to air pollution.

B. Do not discharge smoke, dust, equipment exhaust, or any other air contaminants into atmosphere in quantities sufficient to violate Federal, State, AQMD or local regulations.

C. Label all containers of paint, thinner, curing compound, solvent or liquid asphalt to indicate the contents fully comply with the applicable material requirements.

D. Maintain equipment engines in proper tune and operate construction equipment to minimize exhaust emissions. Do not discharge air pollutants (dust, smoke, or other air contaminants) into atmosphere in such quantities to violate regulations of any legally constituted authority.

E. Phase and schedule polluting construction activities to avoid emission peaks.

F. Do not allow fugitive dust to be visible beyond City’s facilities’ property lines.

1. Employ dust control measures to City’s satisfaction throughout project duration to prevent construction dust from harming or annoying persons living in or occupying buildings near Work.

2. Use reasonable and typical watering and dust preventative techniques to reduce fugitive dust emissions. Furnish all labor, equipment, and means required (including watering or soil binders), and carry out effective measures wherever and as often as needed to prevent Contractor’s operations from producing dust in amounts damaging to property, cultivated vegetation, or domestic animals; or causing a nuisance as determined by City.

Page 1196 of 1826 ends

01 74 00 – Cleaning and Waste Management - Page 2 of 6
12-17-vw

3. Wet all unpaved demolition and construction areas as necessary during excavation and construction.

4. Use temporary dust covers to reduce dust emissions and meet SCAQMD Rule 403.

5. Cover or wet loads of excavated material or rubbish leaving site or of material being imported to prevent blowing dust.

6. Spread soil binders on site, unpaved roads, and parking areas when needed to control dust and wind-blown particles from causing a nuisance or violating air quality standards.

7. Submit dust control plan and obtain City’s acceptance before beginning Work off paved roads or any activity that might stir up dust.

G. Pursuant to CCR Title 13 §2449(d)(3), Contractor shall ensure self-propelled dieselfueled vehicles on jobsite, 25-hp and up and not designed for on-road driving, limit idling to no more than 5 consecutive minutes, with the following exceptions:

1. Idling when queuing;

2. Idling to verify vehicle is in safe operating condition;

3. Idling for testing, servicing, repairing, or diagnostic purposes;

4. Idling necessary to accomplish work for which vehicle was designed (such as operating a crane)

5. Idling required to bring machine system to operating temperature; and

6. Idling necessary to ensure safe operation of vehicle.

H. Promptly pay fines assessed for noncompliance with Title 13 idling limitations for any equipment owned or rented by Contractor or his subcontractors.

I. Comply with air quality regulations pertaining to portable engines with rated horsepower of 50-bhp or greater and other applicable portable equipment by meeting the following requirements:

1. Engines or other applicable portable equipment shall have SCAQMD permit or be registered with CARB.

2. Engines furnished shall satisfy applicable emissions standards, as set forth in CCR Title 13 (Article 5, §2450-2466) and Title 40 of Code of Federal Regulations, Part 89.

3. Engines shall be equipped with non-resettable elapsed-operating-time meter.

Submit activity reports to regulators as required.

4. If any of the Contractor or subcontractor engine or equipment is to be located at City facilities for more than twelve (12) consecutive months, provide the City with all information necessary for City to revise its Title V operating permit. This information shall include, but is not limited to, detailed equipment description, specifications, emissions information, dispersion modeling, permits, registrations, monitoring records, and source tests reports required by the permit for the subject equipment. Submit this information to the City no later than the end of the sixth month the equipment is located at City facilities. If the Contractor fails to provide the specified information in the specified time frame, the Contractor shall bear all fees, costs, and penalties including, but not limited to, filing fees, attorney fees, fees associated to acquire necessary offsets, fees for excessive emissions, etc. associated with City obtaining necessary variances from SCAQMD.

Page 1197 of 1826 ends

01 74 00 – Cleaning and Waste Management - Page 3 of 6
12-17-vw
J. Provide responsible personnel in direct control of all vehicle and equipment fueling operations at all times to prevent fuel spills. Continuously monitor fueling at all times and comply with SCAQMD Rule 461, “Gasoline Transfer and Dispensing.” K. Per SCAQMD Rule 401 – “Visible Emissions,” no visible emissions from any engine shall be as dark as or darker than No. 1 in the Ringleman Chart for a period or periods aggregating more than 3 minutes per hour.

L. Maintain usage records of volatile organic compound (VOC) materials according to SCAQMD Rule 109 and pay annual fees according to Rule 301. Usage records shall contain:

1. Manufacturer’s Name

2. Product Name/Number

3. Quantity (in gallons)

4. VOC Content (in lb/gal)

5. SCAQMD Rule Number or California Code section

1.5 Cleaning During Construction
A. Maintain areas impacted by Work in a neat, safe, clean and sanitary condition, including adjacent properties, and public and on-site access roads to satisfaction of agency having jurisdiction over property. Keep work-impacted areas free from construction waste, mud, debris and rubbish.

B. Treat access roads and parking areas as needed to control dust and prevent tracking of mud onto paved streets.

1. Minimize spillage on haul routes.

2. Clean public access roads to site. Remove material falling from haul trucks and clean spill areas.

3. Wet down dry materials and rubbish, apply dust palliative or modify operations as needed to prevent blowing dust.

4. Under no circumstances shall vehicles leaving Work site track mud onto public right-of-way.

5. Sweep streets daily using self-loading rear-broom motor sweeper with vacuum and spray nozzles to remove any mud or waste tracked from Work site to public streets. If streets are kept clean, City’s Representative may accept less frequent cleaning.

6. Refer to Section 01 50 00 for dust control measures.

C. Dispose of rubbish, surplus, demolition, and waste materials occurring at Work site offsite in conformance with local, state, and Federal codes, ordinances, and antipollution laws governing locations and methods of disposal.

1. Provide containers for collecting and disposing of waste materials.

2. Do not stockpile rubbish or debris. Store worksite rubbish and debris in roll-off, enclosed containers prior to disposal.

3. Do not burn or bury rubbish and waste materials on project site.

4. Do not dispose of volatile wastes, such as mineral spirits, oil or paint thinner, in storm or sanitary drains.

5. Do not dispose of wastes into streams or waterways.

Page 1198 of 1826 ends

01 74 00 – Cleaning and Waste Management - Page 4 of 6
12-17-vw

6. Dispose of asbestos as required by law.

7. Dispose of lead paint as required by law.

8. Establish regular intervals of collection and disposal of materials and waste.

9. Secure disposal site and legally dispose of all excess materials not used in backfilling operations.

10. Remove from the site and legally dispose of all materials resulting from demolition work which are not otherwise shown for salvage.

11. Take care to prevent spillage on haul routes. Contain and remove such spillage and clean the area.

12. Clean public access roads to site. Remove material falling from haul trucks.

D. Obtain written permission from property owner prior to disposing of surplus materials, waste products or debris on private property.

E. Use only cleaning materials recommended by manufacturer of surface to be cleaned.

F. If Contractor fails to keep Work site free from rubbish and debris, City’s Representative may suspend Work until condition is corrected.

1.6 Final Cleaning
A. Restore construction areas to preconstruction conditions after completion of Work and immediately before final inspection.

B. Restore lines and grades of areas used for earthwork storage.

C. Clean, sweep, and wash Work and equipment including finishes.

D. Remove grease, dust, dirt, stains, labels, fingerprints and foreign materials from sight-exposed interior and exterior finished surfaces. Polish surfaces such as glass, stainless steel, plumbing fixtures, finish hardware and similar finish surfaces and equipment.

E. Repair, patch and touch up marred surfaces to specified finish to match adjacent surfaces.

F. Broom-clean paved surfaces.

G. Rake-clean other surfaces of grounds.

H. Remove from City's property temporary structures and materials, sanitary facilities, fencing, barricades, and equipment and appurtenances not required as part of, or appurtenant to, completed Work.

I. After Work is complete, remove from site loose concrete, lumber, wire, aggregate or rock piles, reinforcing, rubbish, debris and materials not incorporated in Work.

Remove excess pointing mortar materials and other debris within pipes.

1.7 Unit Prices
A. Payment for cleaning, waste management, and disposal will be included in items of Work to which cleaning, waste management, and disposal is appurtenant.

PART 2 - PRODUCTS (Not Applicable)

Page 1199 of 1826 ends

01 74 00 – Cleaning and Waste Management - Page 5 of 6
12-17-vw
PART 3 - EXECUTION (Not Applicable)

END OF SECTION

Page 1200 of 1826 ends

01 74 00 – Cleaning and Waste Management - Page 6 of 6
12-17-vw

THIS PAGE INTENTIONALLY BLANK

Page 1201 of 1826 ends

01 77 00 – Closeout Procedures - Page 1 of 4
3-18-vw
SECTION 01 77 00

CLOSEOUT PROCEDURES
PART 1 - GENERAL

1.1 Work Included
A. Specific administrative procedures, closeout submittals, and forms to be used at substantial completion and final completion of Work, and project record documents.

1.2 Related Work
A. Section 01 29 73: Schedule of Values
B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 74 00: Cleaning and Waste Management
E. Section 01 75 00: Equipment Commissioning and Facility Startup F. Section 01 78 39: Project Record Documents

1.3 Quality Assurance
A. Upon completion of contract, Work shall be finished, tested and ready for operation.

Work shall fulfill its intended purpose as described in Contract Documents, in submittals, and in Manufacturers’ literature.

B. Where connections or disruptions have been made to existing work, repair, reactivate, refill and recharge components, restoring them to preconstruction conditions. Follow procedures of authorities having ownership or jurisdiction for Work involving existing utilities and services.

1.4 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
Monument Survey Show record locations of monuments or benchmarks disturbed and reset by Contractor. Monument survey, if required shall be sealed by surveyor licensed to practice in California.
.

Schedule of Materials and
Equipment Costs
See Section 01 29 73
Record Drawings See Section 01 78 39

1.5 Unit Prices
A. Payment for Work required in Contract Documents will be included in the price bid for items of work for which Work is required.

PART 2 - PRODUCTS (not used)
PART 3 - EXECUTION

3.1 Field Quality Control

Page 1202 of 1826 ends

01 77 00 – Closeout Procedures - Page 2 of 4
3-18-vw
A. Following system demonstration, schedule and attend final inspection and walkthrough with City’s Representative. At walkthrough, City’s Representative will review City-prepared punch list of items requiring correction with Contractor and present punch list to Contractor within 72 hours of meeting. Address the punch list items promptly.

B. Should Contractor elect to protest a punch list item rather than address it to City’s satisfaction, City reserves the right to withhold up to 150% of the value of the disputed Work, in accordance with Public Contracting Code, as reserve sufficient to hire a third party to perform unfinished work until such time as the dispute can be resolved.

C. Eleven month warranty inspection shall be conducted prior to release of bonds.

Work failing to comply with Specifications or performance standards stated in Manufacturers’ submittals or printed promotional literature will at that time be tagged as defective and scheduled for repair. Repair all defective work in strict accordance with the Contract Documents and to the satisfaction of City’s Representative.

1. City will establish inspection date and will notify Contractor at least 30 days in advance.

2. Warranty Inspection Report will be prepared by City’s Representative and delivered to Contractor. It will set forth the number and type of failures observed and the names of persons making the inspection.

3. Repairs shall proceed promptly. Upon completion of inspection and receipt of Inspection Report, City will establish a date for Contractor to proceed with remedial Work. Delay on the part of the Contractor to proceed with remedial work on schedule shall constitute a breach of this contract. In such case, City may proceed to have defects remedied as outlined in Contract Documents.

4. Costs of warranty inspection and repair shall be borne by Contractor, who shall include an appropriate amount for testing and repair in his bid. No additional allowance will be paid by City for warranty inspection and repairs.

D. Perform landscaping plant maintenance in accordance with the requirements of Section 32 90 00.

3.2 Adjusting and Cleaning
A. Refer to Section 01 74 00 for requirements for final cleaning.

B. Complete repair and restoration operations before requesting final inspection.

1. Repair or remove and replace defective construction. a. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
b. Where damaged or worn items cannot be repaired or restored, provide replacements.
c. Remove and replace operating components that cannot be repaired. d. Restore damaged construction and permanent facilities used during construction to specified condition.

2. Remove and replace chipped, scratched, and broken glass, reflective surfaces, and other damaged transparent materials.

Page 1203 of 1826 ends

01 77 00 – Closeout Procedures - Page 3 of 4
3-18-vw

3. Touch up and otherwise repair and restore marred or exposed finishes and surfaces.
a. Replace finishes and surfaces that that already show evidence of repair or restoration.
b. Do not paint over "UL" and other required labels and identification, including mechanical and electrical nameplates.
c. Remove paint applied to required labels and identification.

4. Replace parts subject to operating conditions during construction that may impede operation or reduce longevity.

5. Replace burned-out bulbs, bulbs noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

3.3 Extra Stock/Spare Parts
A. Supply with the equipment any special tools and the manufacturer's standard spare parts, if required by Contract Documents or for normal operation and maintenance during the first year of operation. Package tools in a steel case, clearly and indelibly marked on the exterior to indicate equipment for which tools are intended.

B. Deliver spare parts in manufacturer's original containers labeled to completely describe contents and equipment for which it is furnished.

C. Provide to the City’s Representative a list of all spare and replacement parts with individual prices and location where they are available. Prices shall remain in effect for a period of not less than one year after final acceptance.

END OF SECTION

Page 1204 of 1826 ends

01 77 00 – Closeout Procedures - Page 4 of 4
3-18-vw

THIS PAGE INTENTIONALLY BLANK

Page 1205 of 1826 ends

01 78 39 – Project Record Documents - Page 1 of 4
7-18-vw
SECTION 01 78 39

PROJECT RECORD DOCUMENTS
PART 1 - SCOPE

1.1 General Requirements
A. Maintain one accurate, legible set of Record Drawings at site and available for review by City’s Representative in Contractor’s field office or in superintendent’s truck for duration of Work.

B. Final project Record Drawings prepared by engineer of record will rely on contractor record drawings, and information collected during construction by City’s Representative and others as basis for preparing final project Record Drawings.

C. Prepare construction photographic documentation.

D. Refer to Section 01 32 33 for requirements for construction photos and video documentation.

1.2 Related Work
A. Section 01 32 33: Construction Photographic and Video Documentation B. Section 01 33 00: Submittal Procedures
C. Section 01 79 00: Demonstration and Training

1.3 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
Record Drawing Prints One working set of record drawings as created during the course of Work; and
One final set of record drawings, certified as to
accuracy and signed
.

PDF File of Record Drawings on CD ROM Disc One copy in labeled plastic jewel case Record Drawing Certifications Submit monthly with progress payment request Photograph Digital Files on CD ROM Disc One copy in labeled plastic jewel case

1.4 Record Drawing Requirements
A. Provide Record Drawings on one set of full-size project blackline prints of Contract Drawings and other drawings forming part of contract, showing installed locations of improvements and all changes made during construction.

B. Before backfilling trenches, show on Record Drawings locations by key dimensions, depths, elevations, all underground piping, conduit, duct banks, sensor lines, cables, valves, capped ends, branch fittings, pull boxes, and Work whose location differs from that shown on Plans, or where design is shown schematically, and dimensions are not shown on original plans.

C. Do not conceal Work until required Record Drawing information has been recorded.

City may direct Contractor to expose concealed Work if Work was not recorded on Record Drawings.

D. Show all Record Drawing changes in contrasting color to original.

Page 1206 of 1826 ends

01 78 39 – Project Record Documents - Page 2 of 4
7-18-vw
E. In showing changes in Work, or added Work, use same legends used on Contract Drawings. Show locations and elevations to same level of accuracy as original Contract Documents. Tie dimensions to permanent point with 2-point tie-down system.

F. Report changes and deviations promptly to City's Representative.

G. Record drawings shall incorporate addenda, supplementary drawings, working drawings, change orders and clarifications.

H. Incorporate the following into Record Drawings:

1. Addenda

2. Supplementary Drawings

3. Working Drawings

4. Change Orders – note the number of the change order on the drawing

5. Responses to Requests for Information

6. Jobsite memorandums

7. Clarifications

8. Field observations of existing utilities and conditions

9. Informal no-cost changes and corrections requested or accepted by City’s Representative

10. Additional details describing Work not shown on Plans

11. Survey notes

12. Field notes

13. System demonstration logs

14. Explanatory comments at informal changes where cause is significant but not obvious
I. Locate by survey and identify on Record Drawings substructures encountered while excavating and subsequently left in place.

J. Where Plans are diagrammatic or lacking precise details, produce dimensioned fullsize sheets as Record Drawings. For installations outside of structures, give locations by coordinates and elevations. Where substructures are encased in concrete, give outside dimensions of encasement. Contractor may submit additional 24” x 36” sheets detailing record work as approved by City.

K. Mark record drawings at time material and equipment are installed to maintain drawings current with all entries reviewed by City’s Representative. Bring Record Drawings to all progress meetings.

L. Show actual measured dimensions, not calculated values.

M. Maintain Record Drawings on an up-to-date basis with all entries reviewed by City’s Representative. Bring record drawings to all progress meetings.

N. Protect Record Drawings from damage or loss.

O. Clearly show on Record Drawings all discrepancies between Contract Documents and installed Work.

P. Record information on how to maintain and/or service concealed Work.

Page 1207 of 1826 ends

01 78 39 – Project Record Documents - Page 3 of 4
7-18-vw
Q. Concealed shall mean construction installed underground or in area which cannot be readily inspected by use of access panels, inspection plates or other removable features.

R. Record final hydraulic and electrical equipment control settings in appropriate tables and spaces provided on Record Drawings.

S. In addition to paper record drawings, provide PDF copy of record drawings on CD ROM disc or flash drive delivered to City in labeled plastic case.

1.5 Photograph Requirements
A. Provide construction progress photographs of all work to be buried or hidden including:

1. Piping;

2. Pipe connections, valves, fittings, and equipment;

3. Conduits, duct banks;

4. Reinforced concrete footings, walls, and foundations with reinforcing steel in place prior to concrete placement;

5. Construction site, electrical, mechanical and;

6. Other items as directed by City Representative.

B. Provide construction progress photographs and final completion photographs as required in Section 01 32 33.

1.6 Unit Prices
A. Payment for record drawings required in Contract Documents will be included in price bid for items of work for which record drawings are required.

B. Progress payment requests may be withheld if daily logs, schedule updates, record drawings, or project photographs are damaged, lost or not kept current to satisfaction of City's Representative.

PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION

3.1 General
A. Maintain the following in Contractor’s field office in clean, dry, legible condition:

1. Contract Drawings,

2. Specifications,

3. Addenda,

4. accepted Shop Drawings,

5. Samples,

6. Photographs and video documentation,

7. Change Orders,

8. Other Modifications of Contract,

9. Test records,

Page 1208 of 1826 ends

01 78 39 – Project Record Documents - Page 4 of 4
7-18-vw

10. Survey data,

11. Field Orders,

12. All other documents pertinent to Contractor’s Work, including Work by Subcontractors.

B. During progress payment request meetings, submit signed certification stating record drawings are complete and accurate as of date of payment request, and present current record drawing documents for review.

C. Make documents available at all times for inspection by City. Do not use Record Drawings for any other purpose nor remove them from office without City’s acceptance.

D. At Completion of Work and after Final Inspection, copy Record Drawing information (as installed) data, using red ink, onto new set of high quality prints. Certify with signature as to completeness and accuracy of "as installed" information shown on prints.

E. Deliver marked record set of Record Drawings as submittal to City, for review and acceptance, both field developed prints and final signed prints as condition precedent to City's final acceptance of Work and release of retained funds. City will use final signed Record Drawings to create reproducible mylar Record Drawings.

F. Submit completed project photographs on CD or USB Drive with final record drawings submittal.

END OF SECTION

Page 1209 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 1 of 9
SECTION 02 41 13

SELECTIVE SITE DEMOLITION
PART 1 - GENERAL

1.1 Work Included
A. Site demolition, including above and below existing site improvements and utilities as shown on the plans.

B. Work will require restoring existing facilities, utilities, and structures to remain in place if damaged by demolition or removal operations.

C. Refer to the following sections for Work not covered herein.

1. Section 01 50 00 for dust and noise control requirements.

2. Section 32 12 16 Paving Conforming to Greenbook Specifications

3. Section 31 05 50 for protecting existing utilities.

1.2 Related Work
A. Section 01 10 01: Summary of Work and Sequence of Construction B. Section 01 22 00: Unit Prices
C. Section 01 33 00: Submittal Procedures
D. Section 01 35 43: Environmental Procedures
E. Section 01 35 44: Environmental Procedures for Hazardous Materials F. Section 01 40 00: Quality Requirements
G. Section 01 50 00: Temporary Facilities and Controls
H. Section 01 65 00: Product Delivery Requirements
I. Section 01 66 00: Product Storage and Handling Requirements J. Section 01 73 00: Execution
K. Section 01 74 00: Cleaning and Waste Management
L. Section 31 05 50: Protecting Existing Utilities
M. Section 31 23 00: Excavation and Fill

1.3 System Description
A. Remove the following items.

1. Site items including:
a. Existing concrete overflow drains and grate
b. Existing drainage rock
c. Existing straw baffles
d. Existing pipe clean outs
e. Buried existing gravity sewer piping as shown on plans f. Buried existing perforated drain piping as shown on plans B. Legally dispose of Items not designated for salvage.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods needed for proper performance of Work of this section.

Page 1210 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 2 of 9

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ANSI/ASSE A10.6 Safety and Health Program Requirements for Demolition Operations

2. California Building Code (CBC)

3. California Fire Code (CFC)

4. California Green Building Code (CGBC)

5. California Mechanical Code (CMC)

6. California Plumbing Code (CPC)

7. ICRI 310.2R Selecting and Specifying Concrete Surface Preparation for Sealers, Concrete Coatings, Polymer Overlays, and Concrete Repair

8. ICRI 310.3R Preparation of Concrete Surfaces for Repair Using Hydrodemolition Methods

9. NFPA 70 National Electric Code (NEC)

10. NFPA 241 Safeguarding Construction, Alteration, and Demolition Operations

1.6 Hazardous Materials Survey
A. A hazardous materials survey has not been completed for this project.

1.7 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION

MOBILIZATION SUBMITTALS
Report on Preexisting
Damage
Submit inspection report of facility and site itemizing defects and damage or deterioration in place before start of demolition.

Permits Submit copies of permits and notices authorizing demolition Submit copies of permits for transport and disposal of debris

DRAWINGS
Working Drawings Submit Working Drawing detailing removal operations and showing methods and sequence of removal and equipment to be used.

Include inventory of items to be removed and salvaged.

QUALITY ASSURANCE AND CONTROL SUBMITTALS
Receipt for Legal Disposal of
Regulated Materials
Submit receipt for acceptable disposal of legally regulated waste materials.

CLOSEOUT SUBMITTALS
Certificates of Severance of
Utility Services
Submit as required by City’s Representative for utilities being disturbed or abandoned.

Include drawings documenting locations of service lines and capped utilities B. Refer to Section 01 33 00 for definition of requirements for Working Drawings.

1.8 Project Site Conditions
A. Refer to Section 01 10 01 for full list of project site conditions.

1.9 Unit Prices
A. Refer to Section 01 22 00 for measurement and payment clauses for site demolition.

B. Where no bid item is set forth for hazardous materials, the following Work shall be completed under other appropriate bid items:

1. Preparation and submittals of hazardous materials surveys, reports, and environmental documentation as required by law.

2. Remediation and legal disposal of first 50 lbm of asbestos containing construction materials, including gaskets, grout, and other incidental ACCM’s.

Page 1211 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 3 of 9

3. Remediation and legal disposal of first 50 lbm of lead-based paint (LBP) and/or lead containing paint (LCP).

4. Remediation and legal disposal of first 50 lbm of other collective hazardous materials including cadmium-plated bolts, chromium containing paint, mercury switches, mercury ballasts, and PCB’s.

C. For quantities of ACCM’s, LBP/LCP’s, or other hazardous materials >50 lbm, a change order will be negotiated with Contractor for removal and remediation or encapsulation.

PART 2 – PRODUCTS

2.1 Acceptable Consulting and Remediation Firms
A. Acceptable hazardous material consulting firms include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Hazardous Materials
Consulting Firms
A-Tech Consulting, Inc. Orange, CA (714) 434-6360
Ambient Environmental, Inc. Norco, CA (951) 272-4730
Citadel Environmental Services, Inc. Glendale, CA (818) 246-2707 Pacific Environmental Company Laguna Niguel, CA (800) 303-6484 Patriot Environmental Services, Inc. Wilmington, CA (800) 624-9136 Accepted equal with ≥5 years experience
B. Acceptable remediation firms include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Hazardous Materials
Removal and Disposal
Advanced Cleanup Technologies, Inc. Carson, CA (800) 334-2284 Ocean Blue Environmental Long Beach, CA (562) 624-4120
Patriot Environmental Services, Inc. Wilmington, CA (800) 624-9136 PSC Industrial Outsourcing Long Beach, CA (562) 997-6000 Specialized Environmental Anaheim, CA (562) 698 9222
Accepted equal with ≥5 years experience

2.2 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Asbestos
Encapsulation
Compound
Certane 1000 Post Removal Encapsulant. Eden Prairie, MN Accepted equal
PART 3 - EXECUTION

3.1 Preparation
A. Survey and field-identify structures, improvements, systems and equipment to be demolished before beginning demolition Work.

1. Field-identify conduit, piping, ductwork, equipment, pads, and improvements to be removed with tags or paint.

2. Schedule walkthrough with City’s Representative to confirm items to be demolished and items to be protected in place are properly identified

3. Notify utility companies in advance and obtain approval before starting demolition.

B. Do not begin demolition until after Work to be demolished is tagged.

C. Arrange and pay for disconnecting, capping and plugging of utility services.

1. Place markers to show location of disconnected services.

2. Ascertain utilities servicing occupied or active portions of surrounding facilities will not be disturbed unless otherwise indicated.

D. Shut off or disconnect utilities affecting demolition Work.

Page 1212 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 4 of 9

1. Coordinate and schedule shutdowns with City.

2. Notify City 3 Calendar Days in advance of shutdowns required to perform Work. a. City will open/close valves on piping and electrical disconnects required for shutdowns.

3. Where City cannot facilitate proposed duration of outage (8 hour maximum), phase demolition and retrofit Work to allow system or equipment to be reconnected within Cityallotted timeframe or provide temporary power and utility connections as required to maintain service to systems or equipment.

4. Contractor may provide temporary power by portable generator.

E. Coordinate Work with operation and maintenance of existing facilities.

1. If existing facilities cannot be removed from service, perform demolition Work while facility is in operation, using procedures and equipment that do not jeopardize operation or materially reduce efficiency of that facility.

2. Do not begin Work until permission for activities in each area has been granted by City in writing.

3. Complete Work with minimum delay as quickly as possible.

4. When necessary for proper operation or maintenance of portions of facility, reschedule operations so Work will not conflict with required operations or maintenance.

5. Do not interfere with use of adjacent facilities not subject to Work. a. Maintain free and safe passage to and from such facilities. b. Erect and maintain dustproof partitions where needed to limit dust, noise and dirt migration to neighboring properties and occupied portions of adjacent improvements. c. Use water mist and other suitable methods to limit spread of dust and dirt.

6. Provide, erect, and maintain barricades, lighting, guardrails, and protective devices as required to protect adjoining property, occupants, workers, and public safety.

7. Do not store on-site or sell on-site removed items or materials.

8. Do not close or obstruct roadways without permits.
a. Conduct operations to minimize interference to public or private roadways.

F. Where use of cutting torches is anticipated, clear Work area of flammable materials.

1. Maintain portable fire suppression devices nearby throughout flame-cutting.

2. Maintain adequate ventilation throughout flame-cutting G. Prevent movement, settlement, or collapse of structures, facilities, utilities, services, sidewalks, driveways, roadways, and trees.

1. Provide and place shoring and bracing.

2. Cease operations and notify City’s Representative immediately when safety of structures appears to be endangered.
a. Take precautions to properly support structure.
b. Do not resume operations until safety is restored.

3. Erect temporary protection including walks, fences, railings, canopies, and covered passageways needed to ensure safety of personnel and equipment in proximity to demolition.

4. Assume liability for movement, settlement, or collapse. a. Promptly repair damage.

H. Prior to beginning selective demolition, perform thorough inspection of facility and site.

1. Report to City’s Representative defects and structural damage to or deterioration of existing construction to remain.

Page 1213 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 5 of 9
I. Protect existing improvements, improvements, and landscaping to remain.

1. Erect visible fencing around drip line of trees or groups of trees to remain.

J. City assumes no responsibility for items scheduled for demolition.

K. Photograph and measure locations of all pavement markings to allow replacement upon completion of paving operations.

3.2 Demolition
A. Refer to Section 01 73 00 for basic execution requirements.

B. Concrete structure removal shall occur as follows:

1. Exercise care to protect existing structures to remain.

2. Repair collateral damage from demolition as directed by City’s Representative.

3. Before beginning removal operations, sawcut minimum 1” deep true line along limits of demolition on faces of elements to be visible in finished Work.

4. Carefully remove concrete, leaving clean, tooled, near-planar surface for new concrete to bond to.

5. If removal damages edge of existing concrete to be bonded to new concrete, sawcut behind damaged concrete and replace to sawcut line.

6. Burn off reinforcing steel exposed by concrete removal in areas not to be covered by new Work.
a. Burn steel off 1” below concrete surface.
b. Patch voids with epoxy mortar.

7. Burn off reinforcing steel 2” below new finished surface in areas to be covered by new Work.

8. Remove debris from cavities created by demolition.

C. Demolish items as shown on Plans.

1. When a piece of equipment is to be permanently demolished, also remove all ancillary components including wiring, cables, boxes, conduit, solenoids, piping, fittings, valves, switches, and instruments.

2. When a piece of equipment is to be modified or replaced, seal or cap existing conduit, piping, or duct penetrations that will not be reused after existing conduit, piping, or ductwork has been removed.

3. Remove unused piping, and support systems back to point of concealment including abandoned conduit above accessible ceiling finishes.

4. Use chutes, hoists, or other devices to convey debris to ground level in controlled descent.

5. Minimize accumulation of debris in adjacent roadways, walkways, work areas, or Owneroccupied areas except where permission from Owner is obtained.

6. Do not use explosives for demolition.

7. Repair adjacent collateral damage to construction and finishes caused by demolition Work.

D. Protect in place piping systems passing through demolition areas to serve other portions of premises.

E. The following demolition standards shall be followed:

1. Applicable EPA, OSHA, Cal OSHA, and SCAQMD regulations

2. ANSI/ASSE A10.6 Safety and Health Program Requirements for Demolition Operations

3. NFPA 241 Safeguarding Construction, Alteration, and Demolition Operations

4. Standard Specifications for Public Works Construction §300-1 “Clearing and Grubbing”

Page 1214 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 6 of 9

5. Other applicable building, fire, plumbing, mechanical and electrical code requirements F. Refer variances between above documents and Contract Documents to City’s Representative.

G. Demolished items shown to be removed and disposed of by Contractor shall, upon removal become Contractor’s property and shall be disposed of legally.

H. Remediate asbestos according to guidelines set up by EPA, OSHA, CalOSHA and other regulatory agencies. Procedures shall include:

1. Adhere to CCR Title 8, §1529, including construction safety orders regulating dusts, fumes, mists, vapors, and gases associated with asbestos.

2. Asbestos removal shall be performed by trained and registered personnel.

3. Control measures may include wet methods, encapsulation, or removal with HEPA-filterequipped vacuums into labeled polyethylene bags.

4. Demolition shall comply with SCAQMD Rule 1403.
a. Asbestos-related Work conducted during demolition shall be performed by Californialicensed asbestos-abatement contractor under supervision of California State Certified Asbestos Consultant.

5. Remove and dispose of asbestos-containing construction materials (ACCM’s) in compliance with notification, monitoring, and asbestos-removal procedures stipulated in SCAQMD Rule 1403 to reduce asbestos-related health risks.

6. Throughout Work, maintain records of compliance with Rule 1403 for City inspection upon request, including:
a. Evidence of notification of SCAQMD pursuant to Rule 1403, b. Contact information for Asbestos-Abatement Contractor, c. Contact information for Asbestos Consultant,
d. Receipts or other evidence of legal off-site disposal of ACCM’s.

7. Air monitoring relating to asbestos removal Work shall be performed by or under direct supervision of a California State Certified Asbestos Consultant as required by law.

8. Refer to Section 01 35 44 for procedures for disposing of asbestos materials.

I. Following remediation, demolition shall occur as follows:

1. Facilities scheduled for demolition shall be removed, salvaged and disposed of as shown in Contract Documents.
a. Remove and dispose of portions of items scheduled for demolition which interfere with project construction.

2. Backfill and compact site areas disturbed by demolition Work with earth or gravel backfill in accordance with Section 31 23 00.

3. Protect work not intended to be removed or salvaged. a. If in opinion of City’s Representative demolition method used may endanger or damage parts of structure or affect satisfactory operation of facilities, promptly change method upon receipt of notification from City’s Representative.

4. No blasting will be permitted.

5. Equipment, material and piping, scheduled for demolition and not required to be salvaged to City shall become Contractor’s property and shall be removed from project site and disposed of legally.

6. Do not reuse material salvaged from demolition Work on this project except where permitted by Contract Documents.

J. Patching and repair shall occur as follows:

Page 1215 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 7 of 9

1. Patching shall include restoration of surface or item to condition as near as practicable to match existing adjoining surfaces unless otherwise directed.

2. Where patching involves cleaning, painting, special coating, wall covering or other applied finish, clean and refinish entire surface plane, wall or ceiling unless complete refinishing of entire space is required elsewhere.

3. Repair and restore existing improvements to pre-demolition condition.

K. Dispose of removed materials legally and off-site in licensed and City-accepted landfill.

L. Each load for landfill disposal shall be accompanied by manifest verifying hazardous materials were legally disposed of to absolve City of responsibility.

1. Return completed copy of manifest to City after disposal.

3.3 Pavement Removal
A. Remove pavement or road surfacing within limits of construction excavations prior to excavation operations of any nature. Remove surplus material and dispose of as specified.

B. Prior to removal of existing surfacing, make pavement cuts for pipelines at limits of excavations as shown or required by permit. Pavement cuts for trenches shall be neat and straight along both sides of trench and shall parallel pipe alignment to provide unfractured level pavement joints for bonding existing surfacing to new pavement replacement. Make pavement cuts for pipelines at least 12 inches outside trench face to provide benched surface of undisturbed base on which new pavement will be placed to match existing pavement.

C. Where large irregular surfaces are removed, trim or cut paving parallel or perpendicular to roadway centerlines. Cut edges shall have clean, solid vertical faces free from loose material.

D. For trenches 5 feet deep or less, tunnel under existing curbs, gutters, sidewalks and concrete flatwork.

E. Cutting of concrete flatwork shall be done only by permission granted in excavation or encroachment permit.

F. Portland cement concrete pavement, including cross gutters, curbs and gutters, sidewalks, driveways, and other concrete surfaces shall be saw cut to minimum depth of 1½ -inches prior to removal.

G. Sawcut concrete pavement at edge of trench or excavation. Sawcut concrete curbs, gutters and sidewalks to the nearest score marks or construction joints beyond damaged portion as may be required in each case by authority having jurisdiction.

H. Pneumatic tools may be used to cut concrete pavement only with written permission of City's Representative. In such event, a subsequent saw cut shall be made after backfilling, and additional concrete pavement shall be removed and disposed of by Contractor prior to resurfacing.

I. Do not demolish Portland cement concrete using impact equipment such as stomper attachments on backhoes and excavators, wrecking balls, or other means of demolition that may result in vibration and ground shaking unless prior written consent is secured from City’s Representative at least 3 working days before start of demolition.

J. Asphalt concrete surfaces shall be initially cut by means of sawcutting prior to removal of surfacing. Pavement saw-cutting will be required within rights-of-way of county roads and highways, or as required by permits or local governing bodies.

K. Road-mixed surfaces shall be cut at limits of trench and/or excavation prior to removal of existing surfacing.

Page 1216 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 8 of 9

END OF SECTION

Page 1217 of 1826 ends

6-22-dp 02 41 13 – Selective Site Demolition - 9 of 9

THIS PAGE INTENTIONALLY BLANK

Page 1218 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 1 of 10
SECTION 03 10 00

CONCRETE FORMING
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, erection and removal of concrete formwork including formwork, bracing, shoring, supports, falsework, and all appurtenant work.

B. Setting of embedded bolts, anchors, pipe sleeves, conduit sleeves, conduit and similar work under direction of respective trades.

1.2 Related Work
A. Section 01 33 00: Submittal Procedures
B. Section 01 40 00: Quality Requirements
C. Section 01 65 00: Product Delivery Requirements
D. Section 01 66 00: Product Storage and Handling Requirements E. Section 01 73 00: Execution
F. Section 31 23 00: Excavation and Fill
G. Section 03 20 00: Concrete Reinforcing
H. Section 03 30 00: Cast-in-Place Concrete
I. Section 32 13 73: Concrete Paving Joint Sealants

1.3 System Description
A. Furnish and install concrete formwork including appurtenant structural, or mechanical mountings or connections required for compliance with applicable building codes and standards.

B. Forms, shoring and falsework shall perform the following functions:

1. Confine concrete ingredients including water, sand and cement while placing concrete.

2. Confine concrete to required lines, grades and construction tolerances.

3. Provide safe working environment in accordance with OSHA regulations.

4. Support all dead loads and live loads plus superimposed construction loads including equipment, stored materials, personnel, impact loads form falling concrete or other materials, foundation pressures repetitive stress loads from vibrating concrete, and all other vertical and lateral loads during construction.

5. Be of sufficient number and area to allow construction to proceed on schedule.

6. Upon removal, leave concrete with nontoxic, clean, dry surface, free from ridges, fins, offsets, deflection marks, or similar defects. Surface shall be in condition that can be finished by Contractor as required by Contract Documents.

C. It shall be Contractor’s responsibility to design, construct and maintain safe forms, shoring and falsework, including staging, walkways, forms, ladders, and similar appurtenances, at all times in accordance with applicable OSHA regulations.

D. Design formwork prior to fabrication, placing the order, or use on the jobs.

E. Design joints in forms to remain mortar-tight and withstand placing pressures without bulging outward or creating surface patterns.

F. Provide truss supports if adequate foundation for shores cannot be secured.

G. Forms, shoring and falsework that fail to provide all of above functions shall be removed from jobsite immediately at no additional cost to City.

H. Cap protruding reinforcement bars for worker protection in accordance with applicable safety codes.

Page 1219 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 2 of 10

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Comply with the requirements of California Division of Occupational Health and Safety Construction Safety Orders Section 1717 and OSHA Part 1926, Section 1926.701 that apply to the work of this section. Prepare and maintain at least one copy of the required drawings at the site. Design of structures shown on drawings includes no allowance for imposed construction loads. Provide forms, shoring and falsework adequate for dead loads and live loads plus imposed loads during construction, including equipment, height of concrete drop, concrete and foundation pressures, stresses, lateral stability, and other safety factors during construction.

C. Formwork shall comply with ACI 347, except as exceeded by requirements of other regulatory agencies or as otherwise shown.

D. Tolerances of formwork shall comply with ACI 117. Failure of finished concrete work to meet specified tolerances shall be remedied at Contractor’s expense.

1.5 References
A. ACI 117 Standard Tolerances for Concrete Construction and Materials B. ACI 318 Building Code Requirements for Reinforced Concrete C. ACI 347 Recommended Practice for Concrete Formwork
D. California Building Code (CBC) – latest edition
E. California Division of Occupational Health and Safety Construction Safety Orders F. PS1 U.S. Product Standard Code for Concrete Forms, Class 1 G. PS20 American Softwood Lumber Standard

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
Shop Drawings Required for construction and expansion joints placement and for sequence of forming and concrete placing operations per structural shop drawing requirements.
.

Required for embedments, conduit, piping and other wall penetrations per structural shop Drawing requirements.

Product Data Required for form ties, taper tie plugs (if used), form gaskets related work per product data requirements.

Engineering Calculations Required for falsework, formwork and vertical shoring per Engineering Calculations requirements. Calculations shall include statement from preparing engineer certifying falsework, formwork and vertical shoring design meets or exceeds design requirements of Cal OSHA Construction Safety Orders including Article 29 §1717, “Falsework and Vertical Shoring.” B. Refer to Section 01 33 00 for definition of requirements for shop drawings, catalog data, and engineering calculations.

C. Contractor shall maintain at least one copy of accepted shop drawings on site throughout concrete placing operations.

1.7 Delivery, Storage and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow Manufacturer’s instruction and warranty requirements for delivery, storage and handling of concrete formwork.

Page 1220 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 3 of 10

1.8 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid amount for which such Work is appurtenant.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include the following:

ITEM MANUFACTURER MANUFACTURER LOCATION
Form Ties Burke Company (Penta-Tie System) San Mateo, CA Dywidag Systems International Munich. GE
Richmond Screw Anchor Company (Snap Tys) Fort Worth, TX Accepted equal
Reusable and Washoff Forms for Site
Concrete
Labrado – wash off
L.M. Scofield (Lascolite) - reusable
Accepted equal
Form Coatings Grace Construction Materials (Formfilm)
Sika Chemical Corporation (Antisot) Lyndhurst, NJ
Sonneborn Building Products, Inc. (Form-Saver)
Accepted equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Unless expressly accepted by City’s Representative, all lumber brought onto jobsite for use as forms, shoring, or bracing shall be new material of grade shown on accepted shop drawings. Form surfaces shall be smooth.

C. Form materials that remain or leave residues on or in concrete must be classified as acceptable for potable water use by Environmental Protection Agency within 30 days of application or use. Concrete formwork containing arsenic or other toxic materials shall be removed from jobsite and disposed of offsite.

D. Formwork will not adversely affect the concrete and will facilitate placement of concrete to the shape, form, line and grade shown.

E. Formwork shall be constructed of the following materials:

ITEM MATERIAL SPECIFICATION
Wall Forms Steel Design per ACI 347
Provide rubber grommets where ties pass through forms
to prevent loss of cement paste.

Plywood panel PS1 Class 1 edge-sealed Douglas Fir or Southern Yellow Pine plywood
5/8” minimum thickness
Stud spacing close enough to prevent deflection marks.

Floor gasket 1” to 1½” diameter polyethylene rod gasket to seal bottom of wall forms resting on floor slabs or footings to prevent loss of fines and paste during concrete placing and
vibration.

Roof and Floor Forms Plywood ACI 347, PS1 Class 1 edge-sealed Douglas Fir or Southern Yellow Pine plywood
5/8” minimum thickness
Stud spacing close enough to prevent deflection marks.

Page 1221 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 4 of 10

ITEM MATERIAL SPECIFICATION
All Other Forms Steel Panels or Tongueand-Groove LumberACI 347 Provide rubber grommets where ties pass through steel
forms to prevent loss of cement paste.

Plywood ACI 347, PS1 Class 1 edge-sealed Douglas Fir or Southern Yellow Pine plywood
5/8” minimum thickness
Stud spacing close enough to prevent deflection marks.

Lumber for Falsework Douglas Fir or Southern
Yellow Pine
PS 20 Construction Grade or better
Plywood Forms for Surfaces to
be Painted
Plywood Medium Density Overlaid Plywood, MDO Ext. Grade Form Ties – Plywood Forms Plastic Do not use wire form ties.

Do not use snap ties which cause spalling of concrete
upon form stripping or tie removal.

F. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION
Forms and Falsework
Strength Design
Design Load Design for total dead load plus live load of 50 psf.

Minimum Vertical Design Load 100 psf.

Design of structures shown on drawings includes no
allowance for imposed construction loads. Provide forms, shoring and falsework adequate for dead loads and live loads plus all imposed vertical and lateral loads during construction.

Chamfers and Fillets Chamfers Provide ¾” chamfer on exterior corners except where otherwise shown.

Fillets Do not provide fillets on reentrant corners except where shown.

Form Coating Acceptable Materials Non-grainraising, nonstaining resin or polymer type coating Unacceptable Materials Coatings leaving residual matter on concrete surface.

Coatings adversely affecting concrete bonding to paint, plaster, mortar, protective coatings, waterproofing or other applied materials.

Coatings containing mineral oils, paraffins, waxes or other nondrying ingredients.

Form Joint Sealers Design Resilient foam rubber strips, non-hardening plastic type caulking compound free of oil.

Alternate Design Waterproof pressure sensitive plastic tape of minimum 8-mil thickness and 2” width.

Form Tie Hole Filling Use rubber plugs, plastic caulking compound or equal PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to install concrete formwork before submitting shop drawings or ordering. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Install a sufficient number of plumb and string lines before placing concrete.

C. Set pipe stubs, wall sleeves, anchor bolts and other embedded work in forms where required before placing concrete. Consult with all trades that require openings for the passage of pipes, conduits and other inserts and properly and accurately install the necessary pipe sleeves, anchors, or other required inserts, and properly size the equipment pads. Use templates to maintain anchor bolts in position during concrete placing.

D. Embedded items shall be subject to the following constraints.

Page 1222 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 5 of 10

1. Locate embedded items so as not to reduce strength of construction.

2. No embedded item (parallel to surface) shall have an outside diameter greater than ⅓ of slab or wall thickness.

3. Embedded items parallel to surface shall be placed between top or interior reinforcing steel and bottom or exterior reinforcing steel.

4. Embedded items shall not be spaced closer than 3 diameters on center. Diameter shall be taken as largest outside diameter of embedded item.

5. Support embedded items independently from reinforcing steel in manner preventing metallic contact and electrolytic deterioration.

6. Walls or slabs 4½ inches or less in thickness shall have no embedded items (parallel to surface) other than conduit.

7. For corrosion protection, place embedded metallic items so at least 2 inches clearance is provided between any embedded metallic item and any part of concrete reinforcement. Do not secure embedded items in place by wiring or welding to reinforcement.

8. Supplemental reinforcing shall be placed around openings as required.

E. Thoroughly clean forms and embedments before placing concrete.

1. Remove any encrusted dirt, concrete, mortar or grout from forms or embedments.

2. Treat form surfaces with a lubricant acceptable to the City’s Representative at least 2 weeks before using forms.

3. Remove any excess lubricant before placing concrete.

4. Take care to keep lubricant off surfaces of steel reinforcement and embedded items.

F. Before the placement of concrete within the forms, each trade having embedded items, shall certify that all items are properly located and braced. This certification shall be provided by the Contractor to the City’s Representative at least 24 hours in advance of placement.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install concrete formwork at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. Applicable building code requirements

3. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Install concrete formwork to tolerances recommended by Manufacturer and as described below to meet tolerances shown under “Field Quality Control.” Unless otherwise shown, install concrete formwork true, plumb and level using precision gauges and levels.

F. All forms shall be true in every respect to the required shape and size, shall conform to the established alignment and grade, and shall be of sufficient strength and rigidity to maintain their position and shape under the loads and operations incident to placing and vibrating the concrete. Suitable and effective means shall be provided on all forms for holding adjacent edges and ends of panels and sections tightly together and in accurate alignment so as to prevent the formation of ridges, fins, offsets, or similar surface defects in the finished concrete.

G. Concrete forms shall conform to the shape, lines, and dimensions of members as called for on the drawings, and shall be substantial, free from surface defects, and sufficiently tight to

Page 1223 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 6 of 10
prevent leakage. Forms shall be properly braced or tied together to maintain their position and shape under a load of freshly placed concrete. If adequate foundation for shores cannot be secured, trussed supports shall be provided.

H. Form all vertical surfaces except where concrete placement against earth is shown.

I. For members of comparatively limited height, where character of ground is such it can be trimmed to required lines and stand securely without caving or sloughing throughout concrete placement, City’s Representative may permit placing concrete against earth at Contractor’s risk. Should ground fail during concrete placement for any reason, including weather, or other natural or manmade causes, Contractor shall remove concrete in areas of earth failure and reconstruct with forms and new concrete at Contractor’s sole expense.

J. Where concrete is permitted to be placed against trimmed ground in lieu of forms, add at least 1” thickness of additional concrete to face of concrete being formed against earth.

K. Where taper ties are approved for use, larger end of taper tie shall be on wet side of walls in structures retaining water or groundwater
L. Secure gaskets at bottom of wall forms before placing concrete.

M. Provide adequate cleanout holes at bottom of each lift of forms.

N. Provide form windows where concrete cannot be placed from top of wall in manner that meets contract document requirements and the following:

1. The minimum form window opening shall be 18” x 18”.

2. The bottom of the lower openings shall be no more than 48 inches from the top of the wall-footing.

3. The horizontal centerline distance between such openings shall not exceed 96 inches nor shall the distance between the nearest opening and the bulkhead for the vertical joint exceed 36 inches.

4. The vertical centerline distance between horizontal rows of openings shall not exceed 96 inches.

5. Under no circumstances shall forming be such that the drop of concrete in the forms will exceed 4 feet in any one place.

O. Quantity and dimensions of cleanout holes and form windows shall be subject to approval by City’s Representative.

P. Concrete construction joints shall only be made where shown on Contract Documents and accepted shop drawings or approved in writing by City’s Representative. When second lift is placed on hardened concrete, Contractor shall take care to ensure quantities, locations, and tightness of form ties prevents unsatisfactory effects on finished concrete.

Q. Unless otherwise indicated, exterior corners in concrete members shall be provided with 3/4- inch chamfers. Re-entrant corners in concrete members shall not have fillets unless otherwise indicated.

3.3 Field Quality Control
A. Notify the City’s Representative at least 24 hours prior to concrete placement, so the completed formwork can be inspected.

B. Final inspection will be made only after all formwork, embeds, blowouts, screeds, ties, final adjustments, and related work have been completed by the Contractor.

C. Correct defective work found in the inspection, prior to delivery of the concrete.

D. Monitor plumb and string line positions continually throughout concrete placement and correct deficiencies immediately.

Page 1224 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 7 of 10
E. Neither the review of the Contractor’s drawings nor inspection of forms by the City’s Representative or special inspector shall relieve the Contractor of responsibility for the adequacy of the forms nor from the necessity for remedying all defects which may develop or become apparent with use. The City’s Representative may at any time condemn any section, or section of the forms found deficient in all respect, and the Contractor shall promptly remove the condemned forms for the work and replace them.

F. Special inspection and field testing required by Chapter 17 of the CBC (Table 1704.4) shall be completed by an ICBO-certified special inspector selected by City and shall include the following:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY
Concrete
Formwork
Shape, Location
and Dimensions
of Item Being
Formed
ACI 318 6.1.1, and
paragraph C below
Periodic per CBC
Table 1704.4
City Contractor to
reimburse City
for costs of
first deputy
inspector if reinspection is
required
G. Additional field testing shall include the following:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY
Formwork
and
Finished
Concrete
Tolerance of
Finished
Concrete Work
As described below and
ACI 117
Manometer survey may be
required for horizontal slabs
to demonstrate compliance
Inspection at City’s
discretion (may
occur after
concrete is in
place)
City City
H. Tolerances of finished concrete shall be as follows:

ITEM TOLERANCE
Variation of Constructed Linear Outline from Established Position in Plan
¼ inch maximum in 10 feet
½-inch maximum in 20 feet or more
Variation from Level or from Grades Shown ¼ inch maximum in 10 feet ½-inch maximum in 20 feet
¾ inch maximum over entire structure
Variation from Plumb ¼ inch maximum in 10 feet
½-inch maximum in 20 feet or more
Variation in Thickness of Slabs and Walls Minus ¼ inch
Plus ½ inch
Variation in Locations and Sizes of Slabs and Wall Openings Plus or Minus ¼ inch

3.4 Adjusting and Cleaning
A. Remove forms being careful not to damage concrete. Contractor shall remedy damage from improper or premature form removal at his sole expense.

1. No heavy loading on green concrete will be permitted.

2. Forms supporting non-load bearing vertical members including walls and columns shall remain in place for at least 2 days.

3. Forms supporting roof slabs and above-ground floor slabs shall remain in place for at least 14 days and until test cylinders for supported item show all tested concrete has attained 90% of specified 28-day compressive strength,

4. In addition, forms supporting roof slabs and above-ground floor slabs shall remain in place and until test cylinders for slabs, panels, walls, columns, and supporting members

Page 1225 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 8 of 10
adjacent to that item show all tested concrete has attained 90% of specified 28-day compressive strength,

5. Time required to reach 90% of specified 28-day compressive strength shall be established by City’s Representative based on test cylinders taken for this purpose.

6. Forms for all items of work not specifically mentioned herein shall remain in place for time periods determined by City’s Representative.

7. Immediately after removing forms, wet concrete surfaces and keep surface moist until curing procedures begin.

8. Do not apply construction, equipment or permanent loads on columns, supported slabs or supported beams until all concrete in load path to foundation has attained the 28-day design compressive strength.

9. Do not backfill against walls until the top slab is in place and all concrete has obtained compressive strength equal to the specified 28-day compressive strength.

B. Embedded-tie removal shall proceed as follows:

1. No form-tying device or part thereof other than metal shall be left embedded in concrete.

2. Ties shall not be removed in such manner as to leave a hole extending through interior of concrete members.

3. Where metal rods extend through concrete to support or strengthen forms, rods shall remain embedded and shall terminate at least 1” back from formed face or faces of concrete,

4. Where taper ties are removed, ream holes left by removal of form tie cones with suitably toothed reamers. Finished surface of holes shall be clean and roughened for bond before being filled with mortar.

5. A precast neoprene or polyurethane tapered plug shall be placed at the wall centerline.

Hole shall then be completely filled with non-shrink or regular cement grout for above grade walls that are dry on both sides.

6. Exposed faces of walls and ceilings, and floors shall have outer 2 inches of exposed face filled with cement grout matching color and texture of surrounding wall surface.

C. Removable-tie removal shall proceed as follows:

1. Where taper ties are approved for use, place the larger end of the taper tie on the wet side of walls in water retaining structures. After the taper tie is removed, thoroughly clean and roughen the hole for bond.

2. Locate a precast neoprene or polyurethane tapered plug at the wall centerline.

3. Completely fill the hole with non-shrink grout for water bearing and below-grade walls.

Completely fill the hole with non-shrink or regular cement grout for above-grade walls which are dry on both sides.

4. Fill the outer 2 inches of exposed faces of walls with a cement grout matching the color and texture of the surrounding wall surface.

D. Maintain forms in good condition at all times, particularly as to size, shape, strength, rigidity, tightness, and smoothness of surface.

1. Forms, when in place, shall conform to the established alignment and grades.

2. Before concrete is placed, the forms shall be thoroughly cleaned.

3. The form surfaces shall be treated with a non-staining mineral oil or other lubricant acceptable to the Construction Manager. Any excess lubricant shall be satisfactorily removed before placing the concrete. Where field oiling of forms is required, the Contractor shall perform the oiling at least 2 weeks in advance of their use. Care shall be exercised to keep oil off the surfaces of steel reinforcement and other metal items to be embedded in concrete.

Page 1226 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 9 of 10
E. Forms may be reused only if in good condition and only if acceptable to City’s Representative.

1. Light sanding between uses will be required wherever necessary to obtain uniform surface texture on all exposed concrete surfaces. Exposed concrete surfaces are defined as surfaces which are permanently exposed to view.

2. Fill residual tie rod holes with metal caps or other methods accepted by City’s Representative.

3. Thoroughly clean form before reuse.

F. Do not remove shoring and false work after concrete placement or concrete has attained at least 90 percent of the 28-day design compressive strength as demonstrated by control test cylinders, but not sooner than 14 days.

END OF SECTION

Page 1227 of 1826 ends

7-17-vw 03 10 00 – Concrete Forming - 10 of 10

THIS PAGE INTENTIONALLY BLANK

Page 1228 of 1826 ends

5-18-dp 03 15 00 –Concrete Accessories - 1 of 5
SECTION 03 15 00

CONCRETE ACCESSORIES
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of construction joints for concrete work.

B. Refer to Section 03 30 00 for requirements for cold joints.

1.2 Related Work
A. Section 01 22 00: Unit Prices
B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 65 00: Product Delivery Requirements
E. Section 01 66 00: Product Storage and Handling Requirements F. Section 01 73 00: Execution
G. Section 01 74 00: Cleaning and Waste Management
H. Section 03 10 00: Concrete Forming
I. Section 03 20 00: Concrete Reinforcing
J. Section 03 30 00: Cast-in-Place Concrete
K. Section 32 13 73: Concrete Paving Joint Sealants

1.3 System Description
A. Furnish and install concrete accessories where shown, including construction joint materials.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

1.5 References
A. Reference publications below form part of this specification to extent referenced and are referred to within text by basic designation only.

1. ACI 301 Structural Concrete for Buildings Chapter 8.

2. ACI 318 Building Code Requirements for Reinforced Concrete

3. ASTM D41 Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing

4. ASTM D43 Coal Tar Primer Used in Roofing, Dampproofing, and Waterproofing

5. ASTM D412 Test Methods for Vulcanized Rubber and Thermoplastic Elastomers—Tension

6. ASTM D624 Tear Testing for Rubber and Elastomers

7. ASTM D638 Tensile Properties of Plastics

8. ASTM D746 Brittleness Temperature of Plastics and Elastomers by Impact

9. ASTM D747 Apparent Bending Modulus of Plastics by Means of a Cantilever Beam

10. ASTM D792 Density and Specific Gravity

11. ASTM D1149 Rubber Deterioration—Cracking in an Ozone Controlled Environment

12. ASTM D2240 Rubber Property—Durometer Hardness

13. California Building Code (CBC)

1.6 Submittals
A. Furnish the following submittals:

SUBMITTAL DESCRIPTION
Working Drawings Show location and type of joints for each structure.

Product Data Submit for accessories per Product Data requirements.

Installation Instructions Submit for accessories per Installation Instructions requirements.

Show methods and equipment proposed for joint cleanup and waste disposal.

Page 1229 of 1826 ends

5-18-dp 03 15 00 –Concrete Accessories - 2 of 5

SUBMITTAL DESCRIPTION
Certificate of Compliance At least 24 hours before placing concrete, submit certification from each trade having embedded items in concrete to be placed stating embedded items for each trade are properly located, placed and braced.

Materials Samples Also submit samples of fabricated mitered cross and tee constructed of each size and shape of material to be fabricated into crosses or tees.

Owner’s Representative may randomly select fabricated joint samples for testing.

Prepare construction joint sealant adhesion and cohesion test specimens at intervals of 5 working days while sealants are being installed.

Warranty Furnish 3-year warranty from date of final acceptance B. In addition to requirements of ACI, refer to Section 01 33 00 for definition of requirements for Product Data, Installation Instructions, and Certificates of Compliance.

1.7 Delivery, Storage and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery storage and handling requirements.

B. Strictly follow Manufacturer’s instruction and warranty requirements for delivery, storage and handling of concrete accessories.

C. Storage of materials shall conform to requirements of ACI 301.

D. Store materials to prevent damage by moisture or breakage.

E. Do not use aluminum embedments in concrete.

1.8 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid amount for which such Work is appurtenant.

B. Refer to Section 01 22 00 for measurement and payment clauses for concrete accessories.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION

CRACK CONTROL STRIPS
Plastic Crack-Control Strips BoMetals, Inc. Carrolton, GA (770) 832-2000 Accepted equal

JOINT FILLERS
Joint Fillers Refer to Section 07 92 00

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Materials for concrete accessories for facilities not in contact with potable water shall be:

ITEM MATERIAL SPECIFICATION

CRACK CONTROL STRIPS
Plastic Crack-Control
Strips (Zip Strips)
Virgin Poly-VinylChloride Compound

JOINT SEALANTS
Asphalt Paint Asphalt Conform to ASTM D41 or ASTM D43
Pre-Molded Joint Filler,
Sub-Caulking, or Backing
Rod for Self-Leveling
Sealants
Extruded, Closed-Cell,
Polyethylene Foam
Refer to Section 07 92 00.

Preformed Expansion
Joint Filler for Concrete
(Bituminous)
Refer to Section 07 92 00.

Non-Extruding and Refer to Section 07 92 00.

Page 1230 of 1826 ends

5-18-dp 03 15 00 –Concrete Accessories - 3 of 5

ITEM MATERIAL SPECIFICATION

CRACK CONTROL STRIPS
Plastic Crack-Control
Strips (Zip Strips)
Virgin Poly-VinylChloride Compound
Resilient Filler
(Bituminous)
Pre-Molded Joint Filler –
Non-Water Holding
Structures
Neoprene Sponge or
Polyurethane
Refer to Section 07 92 00.

Joint Sealant Primer Conform to sealant Manufacturer’s recommendations.

Plane Horizontal Joints
Self-Leveling 2-
Component
Polyurethane
Refer to Section 07 92 00
Conform to ASTM C920 Class 25 Grade P
Vertical and Overhead
Surfaces
Non-Sag 2-Component
Polyurethane
Refer to Section 07 92 00
Conform to ASTM C920 Class 25 Grade NS
C. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION

CRACK CONTROL STRIPS
Plastic Crack-Control
Strips (Zip Strips)
Design 2-part assembly designed to permit removal of top portion after concrete has hardened, creating clean, neatly defined joint groove for application of caulk or sealant as specified.

Width Provide 1", 1½” and 2" strips as applicable.

PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to install concrete accessories before submitting shop drawings or ordering. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. Before placing concrete within forms, each trade having embedded items, including affected by pour shall certify items are properly located, placed and braced. Accuracy of placement of embedded items is Contractor’s responsibility.

C. Construction joints shown on Contract Documents and accepted shop drawings may be made as shown with provision of keys or other locking shapes to secure proper union with subsequent work.

3.2 Installation/Application
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install concrete accessories at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 19 “Concrete”

Page 1231 of 1826 ends

5-18-dp 03 15 00 –Concrete Accessories - 4 of 5

3. Other applicable building code requirements

4. ACI 301 Structural Concrete for Buildings Chapter 8.

5. ACI 318 Building Code Requirements for Reinforced Concrete

6. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Prepare vertical surfaces of joints as follows:

1. Construction joints shall have keyed, stepped, or roughened surfaces.

F. Construction joints for slabs shall be roughened surfaces only. Do not key construction joints at slab on grade receiving vehicular loading.

G. Construction joints shown on Contract Documents and accepted Working Drawings may be made as shown using keys or other locking shapes to secure proper union with subsequent Work.

H. Locate construction joints as follows:

1. Construction joints are defined as planned joints where 2 placements of concrete meet, across which development and maintenance of bond and water tightness are required, and through which reinforcement is not interrupted.

2. Construction joints may be vertical or horizontal.

3. Locate construction joints as shown on Plans or Working Drawings, or as accepted by City’s Representative.

I. Prepare construction joints as follows:

1. Perform initial construction joint cleaning at latest practicable time and as last operation before setting forms and installing embedded items.

2. Clean concrete such that clean, sound mortar and some coarse aggregate are exposed.

3. Methods for cleaning concrete construction joint surfaces may include wet sandblasting, high-pressure water-blasting, or other methods that do not damage bond surface, cause excessive cutting of surface and undercutting of coarse aggregate particles, or poor uniformity of surface treatment as accepted by City’s Representative.

4. Perform high-pressure water-blasting with proper equipment that is operated at 6,000 psi or greater.

5. Green cutting, removal of unhardened concrete surfaces by water or air-water jet, will not be permitted.

6. Waste Disposal: Method used in disposing of waste water employed in cutting, washing and rinsing concrete surfaces shall ensure waste water does not stain, discolor, or affect exposed surfaces, or damage environment of project area. Disposal method shall be subject to City’s acceptance.

J. Prepare vertical surfaces of joints as follows:

1. Clean joint surface of laitance, loose or defective concrete, coatings, sand, curing compound, stains, and foreign matter that may reduce bond or water tightness of joint.

2. Wash, hydro-blast or sandblast surface with clean water.

3. Clean concrete such that clean, sound mortar and some coarse aggregate are exposed.

4. Method of disposing of sand and wastewater used to wash concrete surfaces shall cause no staining, discoloration, or deterioration of exposed surfaces of structures and improvements.

5. Coat joint surface with epoxy-bonding agent unless otherwise shown.

6. Wet joints not coated with bonding agent before placing concrete adjacent to joint.

K. Prepare horizontal surfaces of joints as follows:

Page 1232 of 1826 ends

5-18-dp 03 15 00 –Concrete Accessories - 5 of 5

1. Roughen horizontal surface with minimum ¼” amplitude profile for good bond.

2. Clean tooled joint surface of laitance, loose or defective concrete, coatings, sand, curing compound, stains, and foreign matter that may reduce bond or water tightness of joint.

3. Wash, hydro-blast or sandblast surface with clean water.

4. Clean concrete such that clean, sound mortar and some coarse aggregate are exposed.

5. Remove ponded water from surface of joints.

6. Method of disposing of sand and wastewater used to wash concrete surfaces shall cause no staining, discoloration, or deterioration of exposed surfaces of structures and improvements.

7. Coat joint surface with epoxy-bonding agent unless otherwise shown.

8. Wet joints not coated with bonding agent before placing concrete adjacent to joint.

9. Cover horizontal joints, except expansion or contraction joints, with 1” layer of Class D mortar (1 part Portland cement – 2½ parts fine aggregate). Limit water in mortar to that required to produce consistency similar to fresh concrete.

10. Check joints for strength and pinholes after splicing.

L. Do not extend steel reinforcement through contraction or expansion joints except where shown on Plans.

M. Install contraction joints containing plastic strip in slabs at locations shown on Plans or as accepted by City’s Representative.

1. Use metal straightedge (guillotine) of same size as plastic strip to cut slot in fresh concrete for insertion of plastic strip.

2. Install plastic strip flush with concrete surface.

3. Work concrete surfaces adjacent to inserted strip with float to close voids around strip and produce contact of concrete with strip.

4. When concrete has hardened, remove upper portion of plastic strip to create joint groove for sealant.

5. Seal joints with mastic joint sealer.

6. Apply sealant materials in accordance with Manufacturer’s recommendations.

END OF SECTION

Page 1233 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 1 of 8
SECTION 03 20 00

CONCRETE REINFORCING
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of steel reinforcement in concrete, including reinforcing bar, welded wire fabric, couplers, concrete inserts, wires, clips, supports, chairs, spacers, epoxy embedment, and other embedded accessories.

1.2 Related Work
A. Section 01 33 00: Submittal Procedures
B. Section 01 40 00: Quality Requirements
C. Section 01 65 00: Product Delivery Requirements
D. Section 01 66 00: Product Storage and Handling Requirements E. Section 01 73 00: Execution
F. Section 03 10 00: Concrete Forming
G. Section 03 30 00: Cast-in-Place Concrete
H. Section 32 12 16: Asphalt Paving Systems Conforming to Greenbook Specifications I. Section 32 12 73: Concrete Paving Joint Sealants

1.3 System Description
A. Furnish and install complete steel reinforcement including appurtenant structural, mechanical and/or electrical mountings or connections required for compliance with Manufacturer’s installation requirements and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Factory testing shall include the following:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY
Steel
Reinforcement
Material
Properties
ASTM A615 As required by City City Contractor
Steel
Reinforcement
Welding
Compliance
with AWS D1.4
AWS D1.4 As required by City City Contractor
Radiographic
testing
AWS D1.4 As required by City City Contractor

1.5 References
A. ACI 117 Standard Tolerances for Concrete Construction Materials B. ACI 315 Details and Detailing of Structural Reinforcement C. ACI 318 Building Code Requirements for Reinforced Concrete D. ASTM A82 Steel Wire, Plain, for Concrete Reinforcement E. ASTM A185 Welded Steel Wire Fabric, Plain, for Concrete Reinforcement F. ASTM A615 Deformed and Plain Billet-Steel Bars for Concrete Reinforcement G. ASTM A706 Low-Alloy Steel Deformed Bars for Concrete Reinforcement H. ASTM C1116 Fiber-Reinforced Concrete
I. AWS D1.4 Structural Welding Code – Reinforcing Steel

Page 1234 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 2 of 8
J. California Building Code (CBC)
K. CRSI MSP Concrete Reinforcing Steel Institute Manual of Standard Practice L. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 201-2 “Reinforcement for Concrete”
M. WRI Manual of Standard Practice for Welded Wire

1.6 Submittals
A. Furnish the following submittals.

SUBMITTAL DESCRIPTION
CBC Chapter 17 Special
Inspection Required
Contractor Statement of
Responsibility
As required in CBC Section 1706
Shop Drawings Shop bending diagrams, placing lists and drawings of reinforcing steel required per structural shop drawing requirements. Comply with ACI 315. .

Show actual bar lengths to nearest inch measured to intersection of tangent extensions of outside bar surface.

Bar placement diagrams shall clearly show dimensions of each bar splice.

Show location of any coupler used with details of how they are installed in formwork.

Show locations of construction and expansion joints.

Show locations of all embedded items including anchor bolts, wall sleeves, conduit and piping which may conflict with steel reinforcing.

Show locations of each coupler and how they are to be installed in formwork.

Product Data Required for mechanical couplers with ICBO test reports per product data requirements.

Installation Instructions Submit written welding procedure for each type of rebar weld for each size of bar intended to be spliced by welding. (A mere statement that AWS procedures will be followed is unacceptable.)
Submit manufacturer’s instructions and recommendations for installation of each type of mechanical coupler used.

Test Record Transcripts For each load of steel reinforcement delivered, submit mill certificates and Manufacturer’s certification of chemical and physical properties of steel as needed to verify steel materials.

Also, submit information needed to determine carbon equivalent of any steel to be welded in accordance with AWS D1.4 and per test record transcript requirements.

Material Samples Required from each heat of reinforcing steel upon City’s Representative’s request.

Sample quantities required if requested shall conform to SSPWC Section 201-

2.4 Required for each type of welded splice upon City’s Representative’s request.

Welder Qualification
Certificates
Required as specified in AWS D1.4 for all welders performing welding of steel reinforcement.

Also submit certifications of procedure qualifications for each welding procedure used.

B. Refer to Section 01 33 00 for definition of requirements for shop drawings, product data, installation instructions, test record transcripts, and material samples.

1.7 Delivery, Storage and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery, storage, and handling requirements.

B. Strictly follow CRSI recommendations included in Manual of Standard Practice for delivery, storage and handling of steel reinforcement.

C. Bundle reinforcement and tag with suitable identification to facilitate sorting, placing and transport.

Page 1235 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 3 of 8
D. Bars with kinks or bends not shown on shop drawings shall be removed from site.

E. Bars with rust, scale, oil or any other coating that would reduce or destroy bond between concrete and steel shall be removed from site.

1.8 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid amount for which such Work is appurtenant.

PART 2 – PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include the following:

ITEM MANUFACTURER MANUFACTURER LOCATION
Dowel System
(alternate to slip
dowels)
Greenstreak (Speed Dowel) St Louis, MO
Accepted equal
Mechanical Bar
Couplers
Dayton Superior (Dowel Bar Splicer System) Dayton, OH
Erico Products, Inc. (Lenton Form Saver) Solon, OH
Richmond Screw Anchor Company (Dowel Bar Splicer
System)
Fort Worth. TX
Accepted equal
Epoxy Grout Systems
for Rebar Dowels into
Existing Concrete
Edoco “BurkEpoxy NS” Kansas City, KS
Master Builders Inc. “Concresive Paste LPL” Cleveland, OH Pecora Corporation “Dynapoxy EP430 Fast” Harleysville, PA Sika Corporation “Sikadur 31 Hi-Mod Gel” (vertical or
overhead applications)
Lyndhurst, NJ
Sika Concrete Restoration Systems SikaDur 32, Hi-Mod
LPL
Lyndhurst, NJ
Simpson Strong Tie Co. Dublin, CA
Accepted equal
Rebar Supports Dayton Superior Dayton, OH
Accepted equal

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Steel reinforcement shall be constructed of the following materials:

ITEM MATERIAL SPECIFICATION
Steel Bar Reinforcement Steel ASTM A615 Grade 60 Billet Steel Deformed Bars Steel Bar Reinforcement -
Welded
Low Alloy Steel ASTM A706 Grade 60 Deformed Bars
Welded Wire Fabric Steel Wire ASTM A185
For wires smaller than W4 size, provide in flat sheets. Do not use roll mesh.

For wires larger than W4 size, provide in flat sheets only Wire Reinforcement Cold Drawn Steel Wire ASTM A82
Tie Wire Annealed Steel 14 gauge minimum
C. Bar supports, chairs or dobies shall comply with CRSI Manual of Standard Practice Chapter 3 and shall be constructed of the following materials:

ITEM MATERIAL SPECIFICATION
Concrete Blocks (Dobies)
(Do not use in slabs or walls
less than 6 inches thick, or
where architectural finish is to
Concrete Minimum 28-day compressive strength f’c equal to that of concrete but not less than 4,000 psi.

Embed wire ties in concrete block bar supports.

Page 1236 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 4 of 8

ITEM MATERIAL SPECIFICATION
be applied.)
Plastic Bar Supports
(Do not use on grade)
Plastic CRSI Class 1 gray
Wire Bar Supports (Do not use
in wastewater environments or
environments exposed to
continuous moisture, water or
corrosion.)
Steel Wire CRSI Class 1 (with ⅛-inch-thick gray plastic coating) D. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION
Mechanical Couplers Provide where shown on accepted shop drawings.

Couplers shall develop 125% of yield strength of reinforcement being spliced.

Do not reduce bar cross section to accommodate couplers.

Threaded couplers require use of next larger size of reinforcing or shall be used with reinforcing bars with specially forged ends providing upset threads which do not decrease the basic cross section of the bar.

Supply all components needed for complete splice.

Epoxy coated at locations where adjacent concrete member is fully or intermittently submerged or buried and subject to exposure to groundwater.

Welded Splices Provide where shown on accepted shop drawings.

Splices shall develop 125% of yield strength of reinforcement being spliced.

Provide all materials required to meet AWS D1.4.

Bending and Forming Bars Conform to ACI 315 and ACI 318.

Fabricate to tolerances shown in ACI 117.

Reinforcing shall be shop fabricated, ready for installation by masons.

PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to install steel reinforcement before submitting shop drawings or ordering. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish, accurately position and install steel reinforcement at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 19 “Concrete” Section 1907 “Modifications to Reinforcement” and Section 1908 “Modifications to ACI 318”

3. Other applicable building code requirements

4. ACI 315 Details and Detailing of Structural Reinforcement

5. ACI 318 Building Code Requirements for Reinforced Concrete

6. Manufacturer’s installation and warranty requirements D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Bundle reinforcement and tag with suitable indication to facilitate sorting and placing, and transport and store at site so as not to damage material. The Contractor shall keep a sufficient supply of tested, approved and proper reinforcement at site to avoid delays.

Page 1237 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 5 of 8
F. Minimum cover for non-pre-stressed steel reinforcement per ACI 318 shall be as follows:

LOCATION BAR SIZE MINIMUM COVER
Concrete Cast Against and Permanently Exposed to Earth #4- #18 3.0 inches Formed Concrete Exposed to Earth or Weather #3-#5 1.5 inches #6-#18 2.0 inches
Formed Concrete Not Exposed to Weather or Earth:

Slabs, Walls or Joists
#3-#11 0.75 inches
G. Minimum spacing between parallel bars per ACI 318 shall be 1 inch or 1 bar diameter, whichever is greater.

H. Installation of steel reinforcement bars shall proceed as follows:

1. Install steel reinforcement to tolerances shown in ACI 117 and Section 7.5 of ACI 318.

2. Do not straighten or re-bend reinforcing steel in manner that will damage material. Do not use bars with bends not shown on Plans. Bends shall be cold-bent. Do not use heat.

3. Reinforcing shall be supported and wired together to prevent displacement using annealed iron wire ties or suitable clips at intersections. Use concrete, plastic or metal supports, spacers or metal hangers which are strong and rigid enough to prevent displacement of steel during concrete placement.

4. Where concrete is placed against earth, use supporting concrete dobies in sufficient numbers to support bars without settlement, but in no case shall support be continuous.

Tie reinforcing steel to dobies with wire ties embedded in blocks. Plastic bar supports not allowed on grade.

5. Where concrete is placed over formwork, furnish concrete, metal, plastic or other acceptable bar chairs and spacers.

6. Bend tie wires away from forms to provide specified concrete cover.

7. Accessories used to support reinforcing bars shall be placed and spaced such that deflections of supports due to weight of supported bars is within tolerances specified by ACI 117 and ACI 318.

8. Where additional bars are provided by Contractor for any reason, they shall be provided at no additional cost to City unless City’s preapproval is evidenced by written change order issued prior to placing steel reinforcement.

9. Bars may be moved as necessary to avoid conflicts with other reinforcement steel, conduits or embedded items. If bars are moved by more than one bar diameter or enough to exceed specified tolerances, secure approval from City’s Representative before placing concrete.

10. Provide additional reinforcing bars around sleeves and openings as shown on Drawings.

11. Store, transport, and place epoxy coated reinforcing bars in such a manner as to avoid chipping of the epoxy coating. Use non-abrasive slings made of nylon and similar materials. Use specially coated bar supports. Repair all chips or cracks in the epoxy coating with a compatible epoxy repair material prior to placing concrete.

I. Installation of welded wire fabric reinforcement shall proceed as follows:

1. Welded wire fabric placed over horizontal forms shall be supported on slab bolsters.

Space slab bolsters no greater than 30 inches on centers, Bolsters shall extend continuously across entire width of reinforcing mat and shall support mat in plane indicated.

2. Welded wire fabric placed over ground shall be supported on wired concrete dobies spaced not more than 36 inches on center in any direction.

3. The construction practice of placing welded wire fabric on ground and hooking it into place in freshly placed concrete shall not be used.

4. Straighten mesh to lie in flat plane and bend mesh as shown or required to fit work.

Page 1238 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 6 of 8

5. Provide laps of at least one complete mesh, unless otherwise detailed. Tie every other wire at laps.

J. Splices shall be made as follows:

1. Splicing shall meet requirements of ACI 318 and applicable building codes unless noted otherwise on drawings.

2. Splicing of vertical bars in concrete is not permitted, except at indicated or approved horizontal construction joints or as detailed on plans or shop drawings.

3. Splicing of horizontal bars in concrete is not permitted, except as detailed on plans or shop drawings.

4. Use of mechanical couplers is not permitted, except as detailed on plans or shop drawings.

5. Welding of reinforcing bars is not permitted, except as detailed on plans or shop drawings.

K. Dowelling and epoxying of rebar into hardened concrete shall proceed as follows:

1. Hole diameter shall be as recommended by epoxy Manufacturer but shall be at least ¼” greater in diameter than outer surface of reinforcing bar deformations.

2. Depth of hole shall be as recommended by epoxy Manufacturer, but shall not be less than 12 bar diameters, unless noted otherwise or unless required to prevent penetration through opposite surface of existing concrete member.

3. Drill hole using methods that do not interfere with proper bonding of epoxy.

4. Field locate reinforcement in existing concrete before drilling using pachometer or other approved locator device. Adjust location of holes to be drilled to avoid drilling through or nicking any existing reinforcing bars.

5. Use compressed air to remove all dust and loose material from freshly drilled holes.

6. Inject epoxy into hole through tube placed at bottom of hole. Withdraw tube as epoxy is placed but keep injection tip immersed to prevent air pockets from forming.

7. Fill hole to a depth that ensures excess material will be expelled from hole during dowel placement.

8. Twist dowels during insertion into partially filled hole to guarantee full wetting of bar surface with epoxy. Insert bar slowly to prevent air pockets from forming.

3.3 Field Quality Control
A. Special inspection and field testing required by Chapter 17 of CBC (Table 1704.3 and 1704.4) shall be completed by an ICBO-certified special inspector selected by City and shall include the following:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY
Steel
Reinforcement
Size Grade and
Type
Compliance with
Contract Documents
Periodic per CBC
Table 1704.3
City Contractor to
reimburse City
for costs of
first deputy
inspector if reinspection is
required
Verification of
Weldability (for
Steel Other than
ASTM A706)
AWS D1.4, & ACI 318
Sec 3.5.2
Periodic special
inspection per
CBC Table 1704.3
Welding AWS D1.4 & ACI 318
Sec 3.5.2
Also inspect for proper
dimensions and
absence of cracks,
undercutting, surface
holes or slag inclusions
Periodic per CBC
Table 1704.3
Placement ACI 318 Sec 3.5, & Periodic per CBC

Page 1239 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 7 of 8

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY

7.1-7.7 & CBC 1913.4 Table 1704.3
Epoxy
Embedded
Dowels
Epoxy Manufacturer’s
Requirements
All dowels
B. Additional field testing shall include the following:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY
Welded Wire
Fabric
Placement Pre-placement
photographs (with
yardstick) showing
support system and
separation from grade
All welded wire
fabric
Contractor Contractor

END OF SECTION

Page 1240 of 1826 ends

7-17-vw 03 20 00 – Concrete Reinforcing - 8 of 8

THIS PAGE INTENTIONALLY BLANK

Page 1241 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 1 of 22
SECTION 03 30 00

CAST-IN-PLACE CONCRETE
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of concrete for buried and above-ground cast-in-place structures, flatwork and paving.

B. Refer to Section 03 10 00 for concrete forming.

C. Refer to Section 03 15 00 for concrete accessories, including construction joints and cast-inconcrete anchors.

D. Refer to Section 03 20 00 for concrete reinforcing.

E. Refer to Section 03 39 00 for concrete curing.

F. Refer to City of Corona Standard Plan 401 for requirements for thrust blocks 4”-18”.

G. Floor hardener shall be applied to entire concrete slab around pump cans and in shop area.

1.2 Related Work
A. Section 01 33 00: Submittal Procedures
B. Section 01 40 00: Quality Requirements
C. Section 01 65 00: Product Delivery Requirements
D. Section 01 66 00: Product Storage and Handling Requirements E. Section 01 73 00: Execution
F. Section 01 74 00: Cleaning and Waste Management
G. Section 03 10 00: Concrete Forming
H. Section 03 15 00: Concrete Accessories
I. Section 03 20 00: Concrete Reinforcing
J. Section 03 39 00: Concrete Curing
K. Section 07 92 00: Joint Sealants
L. Section 31 23 00: Excavation and Fill
M. Section 32 12 16: Asphalt Paving Systems Conforming to Greenbook Specifications N. Section 32 13 73: Concrete Paving Joint Sealants

1.3 System Description
A. Furnish and install complete concrete structural system including appurtenant structural, mechanical and/or electrical mountings, embedments or connections required for compliance with Manufacturer’s installation requirements of other trades and compliance with applicable building codes and standards.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

B. Proportion mixes either by laboratory trial batch or field experience methods, using specified materials acceptable for each type of concrete required, and complying with ACI 211.1.

Page 1242 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 2 of 22
C. Factory (batch plant) testing of aggregate shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY
FIRST

TEST PAID
FOR BY

RETESTS

PAID FOR
BY
Aggregate Ratio of Silica
Released to
Reduction in
Alkalinity
ASTM C33 As directed City Contractor
Loss with
Sodium Sulfate
ASTM C33 As directed City Contractor
Sieve Analysis ASTM C136 1 each trial batch City Contractor Coarse
Aggregate
Abrasion Loss ASTM C33 As directed City Contractor
Fine
Aggregate
Sand Equivalent ASTM D2419 As directed City Contractor
Organic
Impurities
ASTM C40 As directed City Contractor
Color of
Supernatant on
Washing
ASTM C33 As directed City Contractor
D. Plant testing shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER

TEST STANDARD) FREQUENCY

FIRST TEST

PAID FOR
BY

RETESTS

PAID FOR
BY
Concrete Certification of
Mix Design
ACI 301 certified by
independent testing
laboratory
1 per mix Contractor Contractor
Ready-Mix
Concrete
Materials
Materials
Inspection
See Paragraph 2.2 below As directed City City

1.5 References
A. ACI 117 Standard Tolerances for Concrete Construction Materials B. ACI 211.1 Selecting Proportions for Normal, Heavyweight, and Mass Concrete C. ACI 214 Evaluation of Strength Test Results for Concrete D. ACI 301 Structural Concrete for Buildings
E. ACI 304 Measuring, Mixing, Transporting, and Placing Concrete F. ACI 305 Hot Weather Concreting
G. ACI 309 Consolidation of Concrete
H. ACI 315 Details and Detailing of Concrete Reinforcement I. ACI 318 Building Code Requirements for Reinforced Concrete J. ACI 350 Environmental Engineering Concrete Structures K. ASTM C31 Making and Curing Concrete Test Specimens in Field L. ASTM C33 Concrete Aggregates
M. ASTM C39 Compressive Strength of Cylindrical Concrete Specimens N. ASTM C40 Organic Impurities in Fine Aggregates for Concrete O. ASTM C42 Obtaining and Testing Drilled Cores and Sawed Beams of Concrete P. ASTM C78 Flexural Strength of Concrete Using Simple Beam with Third Point Loading Q. ASTM C88 Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate R. ASTM C94 Ready-Mixed Concrete
S. ASTM C117 Materials Finer than 75-μm (No. 200) Sieve in Mineral Aggregates by Washing
T. ASTM C136 Sieve Analysis of Fine and Coarse Aggregates U. ASTM C138 Unit Weight, Yield, and Air Content (Gravimetric) of Concrete V. ASTM C143 Slump of Hydraulic Cement Concrete
W. ASTM C150 Portland Cement

Page 1243 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 3 of 22
X. ASTM C156 Water Retention by Concrete Curing Materials Y. ASTM C157 Length Change of Hardened Hydraulic Cement Mortar and Concrete Z. ASTM C172 Sampling Freshly Mixed Concrete
AA. ASTM C173 Air Content of Freshly Mixed Concrete by Volumetric Method BB. ASTM C191 Time of Setting of Hydraulic Cement by Vicat Needle CC. ASTM C192 Making and Curing Concrete Test Specimens in Laboratory DD. ASTM C231 Air Content of Freshly Mixed Concrete by Pressure Method EE. ASTM C260 Air Entraining Admixtures for Concrete
FF. ASTM C266 Time of Setting of Hydraulic Cement Paste by Gillmore Needlesw GG. ASTM C289 Potential Alkali-Silica Reactivity of Aggregates (Chemical Method) HH. ASTM C309 Liquid Membrane-Forming Compounds for Curing Concrete II. ASTM C494 Chemical Admixtures for Concrete
JJ. ASTM C881 Epoxy-Resin-Base Bonding Systems for Concrete KK. ASTM C932 Surface-Applied Bonding Compounds for Exterior Plastering LL. ASTM C1077 Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation
MM. ASTM C1116 Fiber-Reinforced Concrete
NN. ASTM D1751 Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types) OO. ASTM D2419 Sand Equivalent Value of Soils and Fine Aggregate PP. ASTM E119 Fire Tests of Building Construction and Materials QQ. California Building Code (CBC)
RR. California Green Building Standards Code (CALGreen Code) SS. Caltrans Standard Specifications – Section 90 Portland Cement Concrete TT. California Test Method 214 Soundness of Aggregates
UU. California Test Method 227 Cleanness Value
VV. California Test Method 229 Durability
WW. California Test Method 515 Relative Mortar Strength of Portland Cement Concrete Sand XX. California Test Method 530 Effect of Water-Reducing and Set-Retarding Admixtures on Drying Shrinkage of Concrete
YY. Fed Spec UU-B-790A Building Paper, Vegetable Fiber (Kraft, Waterproofed, Water Repellent and Fire Resistant
ZZ. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 201 “Concrete, Mortar, and Related Materials
AAA. SSPWC Standard Specifications for Public Works Construction (Greenbook) Section 303 “Concrete and Masonry Construction.”

1.6 Definitions
A. Construction Joints: When fresh concrete is placed against a hardened concrete surface, the joint between the two placements is called a construction joint. Unless otherwise indicated, provide all joints in water bearing members with a sealant groove of the shape indicated.

B. Contraction Joints: Contraction joints are similar to construction joints except the fresh concrete shall not bond to the hardened surface of the first placement, which shall be coated with a bond breaker. Stop the slab reinforcement 4-1/2 inches from the joint; which is provided with a sleeve-type dowel, to allow shrinkage of the concrete of the second placement. Provide sealant groove unless otherwise indicated on the drawings.

C. Expansion Joints: Allows the concrete to expand freely by providing a space between the two placements. Form the joint as indicated. This space is obtained by placing a filler joint material against the first placement, which acts as a form for the second placement.

D. Control Joints: The function of the control joint is to provide a weaker plane in the concrete, where shrinkage cracks are expected to occur. Saw cut or form a groove, of the shape and dimensions indicated, in the concrete. Fill the groove afterward with a joint sealant material as specified.

Page 1244 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 4 of 22
E. The term “hydraulic structure” used in these Specifications refers to environmental engineering concrete structures for the containment, treatment or transmission of water or other fluids.

1.7 Submittals
A. Furnish the following submittals in accordance with ACI 301 and California Building Code.

SUBMITTAL DESCRIPTION
CBC Chapter 17 Special
Inspection Required
Contractor Statement of
Responsibilitiy
As required in CBC §1704
Shop Drawings Required per structural shop drawing requirements. In addition to requirements listed under steel reinforcement, show control joints and placement schedule indicating location of construction joints. .

Product Data Required for admixtures and curing compounds per product data requirements.

Installation Instructions Required for admixtures per installation instruction requirements.

Submit materials and methods for curing per installation instruction requirements.

Certificate of Compliance Submit certification from independent testing laboratory mix design complies with these specifications.

Submit mill test certification including fineness for each shipment of cement per ACI 301.

Submit aggregate gradation and certification per ACI 301.

Submit admixture certification including chloride ion content per ACI 301.

At least 24 hours before placing concrete, submit certification from each trade having embedded items in concrete to be placed stating embedded items for each trade are properly located, placed and braced and equipment pads are properly sized.

Engineering Calculations
(Mix Design)
Required for concrete mix design per engineering calculations requirements sealed by California-licensed Civil Engineer.

Mix design shall show:
• Mix identification number
• Applicable proportions, weights and quantities of Portland cement, aggregate, water, admixtures, and sand
• Size and source of concrete aggregates
• Type and source of Portland cement
• Brand and designation of chemical admixtures
Intended type of construction
In addition to original mix design, provide new mix design if change in brand or type of cement or change in source or gradation of aggregates is permitted or if defective concrete occurs.

Brand and Type of
Cement/Source of
Aggregate
Submit brand and type of cement and source of aggregates to allow sampling and testing by City’s Representative.

Delivery Tickets Required for ready-mix concrete as needed to document delivery quantities. In accordance with ASTM C94 Sections 16.1 and 16.2, each ticket shall show • Name of ready-mix batch plant,
• Serial number of ticket,
• State certified equipment used in preparing mix,
• Truck number,
• Name of purchaser & name & location of job
• Mix number,
• Quantities by weight of cement, sand, each class of aggregate, admixtures and water added in batching plant,
• Type and brand of cement & admixtures,
• Source & identification of aggregates,
• Amount of water allowed to be added at site for specified mix,

Page 1245 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 5 of 22

SUBMITTAL DESCRIPTION
• Total yield in cubic yards,
• Date & time of day to nearest minute corresponding to time batch was dispatched, time batch left plant, time batch arrived on site, time unloading began and time unloading was completed.
• Reading of revolution counter at first addition of water Certificates shall be from public weighmaster. City’s Representative will not accept concrete in absence of certificate.

Warranty Furnish one-year warranty from date of final acceptance B. In addition to requirements of ACI, refer to Section 01 33 00 for definition of requirements for shop drawings, product data, installation instructions, certificates of compliance, engineering calculations, test record transcripts, and material samples.

1.8 Delivery, Storage and Handling
A. Refer to Sections 01 65 00 and 01 66 00 for delivery storage and handling requirements.

B. Strictly follow Manufacturer’s instruction and warranty requirements for delivery, storage and handling of concrete admixtures and curing compounds.

C. Storage of materials shall conform to requirements of Section 2.5 of ACI 301 or SSPWC.

D. Store materials to prevent damage by moisture or breakage.

E. Store sacked cement in manner permitting access for inspection and sampling.

F. Use cement in sequence of receipt of shipments.

G. Coarse aggregate with maximum size greater than ¾ inch shall be prepared, stored, and handled in 2 or more size groups. When aggregates are proportioned for each batch of concrete, the 2 size groups shall be combined.

H. Do not use any aluminum materials for handling concrete.

1.9 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid amount for which such Work is appurtenant.

PART 2 - PRODUCTS

2.1 Acceptable Manufacturers
A. Acceptable Manufacturers include:

ITEM MANUFACTURER MANUFACTURER LOCATION
Admixtures –
Dampproofing – Integral
Hydrophobic
Waterproofing
(Alternate to crystalline
waterproofing)
Hycrete Carlstadt, NJ
BASF Hydrocide 600 Freeport, TX
Euclid Chemical Company Damp-Proofing Asphalt
Coating
Cleveland, OH
W.R. Meadows Sealmastic Hampshire, IL
Accepted equal
Admixtures – Set
Accelerating (Use when
air temperature is less
than 40F)
Grace Concrete Products “Daraset” Cambridge, MA
Master Builders Inc. “Pozzutec 20” Cleveland, OH
Sika Corporation “Plastocrete 161FL” Lyndhurst, NJ
Accepted equal
Admixtures – Set
Retarding (Use when air
temperature exceeds 80F)
Grace Concrete Products “Daratard” Cambridge, MA
Master Builders Inc. “Pozzolith 300R” Cleveland, OH
Sika Corporation “Plastocrete” Lyndhurst, NJ
Accepted equal
Admixtures – Water Grace Concrete Products “WRDA 79” Cambridge, MA

Page 1246 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 6 of 22

ITEM MANUFACTURER MANUFACTURER LOCATION
Reducing (Normal Range) Master Builders Inc. “Pozzolith 322-N” Cleveland, OH Sika Corporation “Plastocrete 161” Lyndhurst, NJ
Accepted equal
Admixtures – Water
Reducing (High Range)
Grace Concrete Products “WRDA 19 or Duracem
100”
Cambridge, MA
Master Builders Inc. “Rheobuild 716 or Rheobuild
1000”
Cleveland, OH
Sika Corporation “Sikament FF or Sikament 86” Lyndhurst, NJ Accepted equal
Bonding Agent (Hardened
Concrete to Fresh
Concrete)
Adhesive Engineering Company “Concresive
1001LPL”
San Carlos, CA
Edoco “BurkEpoxy MV” Kansas City, KS
Concresive Div BASF 1001 LPL Freeport, TX
Epoxtile 2391
Euco Epoxy 463
Master Builders Inc. “Concresive Liquid LPL” Cleveland, OH Pecora Corporation “Dynapoxy EP420” Harleysville, PA
Sika Corporation “Sikadur 32 Hi-Mod” or “Sikadur 32
Hi-Mod (LPL)” Epoxy Adhesive
Lyndhurst, NJ
Accepted equal
Epoxy Bonding Adhesive
for Rebar (Steel)
Adhesive Engineering Company “Concresive
1001LPL”
San Carlos, CA
Edoco “BurkEpoxy NS” Kansas City, KS
Master Builders Inc. “Concresive Paste LPL” Cleveland, OH Pecora Corporation “Dynapoxy EP430 Fast” Harleysville, PA Sika Corporation “Sikadur 31 Hi-Mod Gel” (vertical
or overhead applications)
Lyndhurst, NJ
Sika Concrete Restoration Systems SikaDur 32, HiMod LPLLyndhurst, NJ Simpson Strong Tie Co. Dublin, CA
Accepted equal
B. Only one brand of cement shall be used.

C. All admixtures shall be compatible and by a single Manufacturer capable of providing qualified field service representation.

2.2 Materials
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Concrete structural systems shall be constructed of the following materials:

ITEM MATERIAL SPECIFICATION
Cement Standard Brand
Portland Cement
ASTM C150
Type II/V Modified Low Alkali/Sulfate Resisting
Also meet Table 2 optional requirements
At least 85% of cement by weight shall pass 325 screen.

Water Clean, Clear Potable
Water
TDS≤1000 mg/l Water shall not contain impurities causing change in time in setting of Portland cement >25% nor
reduction of f’c>10% compared with results obtained using distilled water
Water for Nonreinforced
Concrete
Clean, Clear Potable
Water
TDS≤2000 mg/l

Page 1247 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 7 of 22

ITEM MATERIAL SPECIFICATION
Coarse Aggregate Specification Meet ASTM C33 requirements Nonreactive gravel, crushed gravel, crushed rock or
combination supplied from pits acceptable to City’s
Representative.

Aggregate shall be of character to facilitate producing workable concrete mixture within limits of specified water content and slump.

Prepare and handle aggregates with a maximum size
greater than ¾-inch in two or more size groups. Combine aggregate groups when aggregates are proportioned for
each batch of concrete.

Cleanness Value
per California Test
Method 227
75 minimum
Percentage Wear
per ASTM C131
Abrasion loss < 10.5% after 100 revolutions
Abrasion loss < 42% after 500 revolutions
Specific Gravity per
ASTM C127

2.58 minimum
Ratio of Silica Released
to Reduction in Alkalinity

1.0 maximum
Fine Aggregate Specification Meet ASTM C33 requirements Nonreactive clean, hard durable washed material
From pits acceptable to City’s Representative
Organic Impurities
per ASTM C40
Satisfactory
Resultant color of testing solution shall not be darker than ASTM C40 standard
Mortar Strength Relative
to Ottawa Sand per
California Test Method
515
100% minimum
Sand Equivalent per
ASTM D2419
>75% average for 3 samples
>70% for any one sample
Percent Clay, Silt, Loam
per ASTM C117
<3%
Soundness per
California Test Method
214
<10%
Soundness requirement will be waived if durability index Df>60 per California Test Method 229.

Ratio of silica released
to reduction in alkalinity
<1.0
Weight Lightweight sand not permitted
Reactivity Nonreactive when tested per ASTM C289 and evaluated per ASTM C33 Appendix X1
Surface-Applied Bonding Agent Surface-Applied
Bonding Compound
ASTM C932
Epoxy Bonding Agent Epoxy Resin ASTM C881
Grout for Smooth Concrete
Finish
1 part Portland cement (½ gray & ½ white portland
cement) White portland cement to be Atlas white or equal. 1 part fine sand passing No. 16 sieve
Calcium chloride (add amount equal to 5% of cement by
volume.)
Sufficient water to provide consistency of thick paint.

Ready-Mix Concrete ASTM C94

Page 1248 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 8 of 22
C. Concrete aggregate will be designated by letter per Standard Specifications for Public Works (Greenbook) Section 201 and shall conform to the following gradations:

PERCENTAGE PASSING SIEVES BY WEIGHT
SIEVE
SIZE

GRADING A
(For concrete
street paving not
integral with curb)

GRADING B
(For concrete
channel and box
inverts)

GRADING C
(For Class AA, A,
A2 or B concrete
not used for
paving or channel
or box inverts. May
be used for Class
C Concrete)

GRADING D
(May be used for
Class B extruded
curbs and gutters
or for gunite)

GRADING E
(For trench
backfill, slurry and
masonry grout
May be used for
Class C concrete.)
2” 100% 100%
1½” 95-100% 95-100% 100%
1” 64-80% 80-96% 95-100%
¾” 55-71% 64-80% 77-93% 100% 100%
⅜” 37-53% 40-52% 50-70% 92-100% 90-100%
No. 4 32-42% 35-46% 39-51% 42-60% 60-80%
No. 8 25-35% 28-38% 31-41% 33-47% 50-70%
No. 16 18-28% 21-31% 22-32% 22-38% 33-53%
No. 30 10-18% 10-20% 12-22% 17-25% 19-35%
No. 50 3-9% 3-10% 3-15% 6-15% 5-15%
No 100 0-4% 0-4% 0-5% 1-6% 2-7%
No. 200 0-2% 0-2% 0-2% 0-3% 0-4%
D. Design concrete mix to meet properties and proportions specified. Design mix to minimize shrinkage, surface flaws, honeycombing and rock pockets around steel reinforcing. Limiting parameters specified are not intended to be a mix design. Additional cement or water reducing agent may be required to achieve workability demanded by Contractor’s methods and aggregates. Contractor is responsible for costs associated with furnishing concrete with required workability, density and strength.

E. In mix designs, the percentage of sand of the total weight of fine and coarse aggregate shall not exceed 41 for hydraulic structures or 50 for all other structures, unless noted otherwise.

F. Use the required quantity of cement regardless of whether or not an admixture is used.

Admixtures shall consist of the following materials subject to acceptance by the City’s Representative:

ITEM MATERIAL SPECIFICATION
Admixtures General Requirements Do not use to reduce cement requirement Shall be free from thiocyanates
Chloride ion <0.05%
Plasticizing Agents ASTM C1017
Set Accelerating Agents (Use
when air temperature is less
than 40°F)
ASTM C494 Type C
Do not use calcium chloride or other chloride-based
accelerators in concrete having steel reinforcing or
embedments.

Calcium Chloride ASTM D98 Use only for nonreinforced concrete High-Range Water Reducing
Admixtures (High Range)
(HRWRA)
ASTM C494 Type B
Water Reducing Agents (High
Range)
ASTM C494 Type F or G
Only one water-reducing admixture shall be used
Water Reducing Agents
(Normal Range)
ASTM C494 Type A
Only one water-reducing admixture shall be used
Water Reducing and Set
Accelerating Agents
ASTM C494 Type E
Only one water-reducing admixture shall be used

Page 1249 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 9 of 22

ITEM MATERIAL SPECIFICATION
Water Reducing and Set
Retarding Hydration Stabilizing
Agents
ASTM C494 Type D
Only one water-reducing admixture shall be used
Specific Performance
Admixtures (SPA)
ASTM C494 Type S
G. Supplementary Cementitious Materials (SCM’s) shall consist of the following materials:

ITEM MATERIAL SPECIFICATION
Fly Ash and other SCM’s Not permitted
H. The following product design criteria, options and accessories are required:

ITEM DESCRIPTION
Class A “Structural” Concrete
Greenbook 600-CW-4000
(Use for foundations, footings,
ring walls, retaining walls, slabs
on grade, beams, columns,
walls, roof and floor slabs, and
other structural concrete.)
f’c 4000 psi per ASTM C39
Cement Content 600 lb cement per cubic yard minimum
but not more than 700 lb cement per cubic yard
Maximum Water/Cement Ratio 0.45 by weight
Aggregate SSPWC Greenbook Grading C
Maximum Aggregate Size 1½ inches
Slump 4-inches maximum per ASTM C143
Water Reducing Admixture Required
Maximum Transit Time 60 minutes (250 revolutions maximum) Class A2 “Premium NonStructural” Concrete
Greenbook 600-C-2500
(Use for pads and minor
structures where City elects to
waive CBC Special Inspection
requirements.)
f’c 2500 psi per ASTM C39
Cement Content 600 lb cement per cubic yard minimum
but not more than 700 lb cement per cubic yard
Maximum Water/Cement Ratio 0.45 by weight
Aggregate SSPWC Greenbook Grading C
Maximum Aggregate Size 1½ inches
Slump 4-inches maximum per ASTM C143
Water Reducing Admixture Optional
Maximum Transit Time 60 minutes (250 revolutions maximum) Class B “Street Paving”
Concrete
(Use for street pavement not
integral with curb and gutter.)
Greenbook 520-A-2500
f’c 2500 psi per ASTM C39
Cement Content 520 lb cement per cubic yard minimum
but not more than 700 lb cement per cubic yard
Maximum Water/Cement Ratio 0.55 by weight
Aggregate SSPWC Greenbook Grading A
Maximum Aggregate Size 2 inches
Slump 3 inches maximum per ASTM C143
Water Reducing Admixture Optional
Maximum Transit Time 90 minutes
Class B “Site Paving” Concrete
(Use for curbs, gutters,
sidewalks, and non-vehicular
paving.)
Greenbook 520-B-2500
f’c 2500 psi per ASTM C39
Cement Content 520 lb cement per cubic yard minimum
but not more than 700 lb cement per cubic yard
Maximum Water/Cement Ratio 0.55 by weight
Aggregate SSPWC Greenbook Grading B
Maximum Aggregate Size 2 inches
Slump 4-inches maximum per ASTM C143
Water Reducing Admixture Optional
Maximum Transit Time 90 minutes
Class B “Site Paving” Concrete
(Use for extruded curbs and
gutters.)
Greenbook 520-D-2500
f’c 2500 psi per ASTM C39
Cement Content 520 lb cement per cubic yard minimum
but not more than 700 lb cement per cubic yard
Maximum Water/Cement Ratio 0.55 by weight
Aggregate SSPWC Greenbook Grading D
Maximum Aggregate Size ¾ inches
Slump 2 inches per ASTM C143
Water Reducing Admixture Optional
Maximum Transit Time 90 minutes

Page 1250 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 10 of 22

ITEM DESCRIPTION
Class C “Utility” Concrete
(Use for encasement, thrust
blocks, fence and guardrail
posts, and mass concrete.)
Greenbook 520-C-2500
f’c 2500 psi per ASTM C39
Cement Content 520 lb cement per cubic yard minimum
but not more than 700 lb cement per cubic yard
Maximum Water/Cement Ratio 0.55 by weight
Aggregate SSPWC Greenbook Grading C
Maximum Aggregate Size 1½ inches
Slump 3-6 inches per ASTM C143
Water Reducing Admixture Optional
Maximum Transit Time 90 minutes
Class D “Slurry Backfill”
Concrete (Use for trench
backfill.)
Greenbook 94-E-100
f’c 100 psi per ASTM C39
Cement Content 94 lb cement per cubic yard
Maximum Water/Cement Ratio 0.60 by weight
Aggregate ¾ inches
Maximum Aggregate Size SSPWC Greenbook Grading E
Slump 6” maximum per ASTM C143
Water Reducing Admixture Optional
Maximum Transit Time 120 minutes
Reinforcing Steel fy 60,000 psi
Fiber-Reinforced Concrete
(Provide in Class AA, A, A2
and B concrete mixes to limit
microcracking and shrinkage
cracks)
Synthetic Fibers Refer to Section 03 24 00
Additional Requirements for
Concrete to which Floor
Hardener is to Be Applied
Slump <4 inches, except where ambient temperatures
are below 65°F, use slump < 3 inches.

Air Content <3%
Other Requirements Do not use set-accelerating admixtures containing calcium chloride.

Do not use admixtures that increase bleeding.

I. With addition of high range water reducer, slump shall be 7 inches +/- 1 inch.

J. Materials furnished for Work shall comply with requirements of ACI 301 §201, §203, and §204 as applicable.

K. Cement shall be clean and free from contaminants. Do not use cement reclaimed from cleaning bags or leaking containers. Do not use lumpy cement.

2.3 Mixes
A. Proportioning shall meet requirements of ACI 301 Chapter 3 “Proportioning.” B. Quantity of water shall be just sufficient to produce workable batches of concrete which can be worked into place without segregation or other flaws and compacted using vibratory methods to provide desired density, impermeability, and smoothness of surface. Adjust water quantity added if needed to adjust for variations in moisture content of aggregate while providing uniform consistency between batches. Determine consistency of batches by slump testing as described below.

C. Mixing shall meet requirements of ACI 301 Chapter 7 “Mixing.” D. Apply admixtures according to Manufacturer’s installation and warranty requirements.

E. Set controlling and water reducing admixtures shall be applied as follows:

1. Use or addition of admixtures shall be at Contractor’s option to increase workability and shall result in no increase in cost to City.

2. Use or addition of admixtures shall be subject to approval by City’s Representative.

Page 1251 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 11 of 22

3. Concrete containing admixture shall be first placed at location determined by City’s Representative.

4. High range water reducing admixtures shall be added to concrete on site after all other ingredients have been mixed and initial slump has been verified. Do not use more than 14 ounces of water reducer per sack of cement. Water reducer shall be considered as part of mixing water when calculating water cement ratio.

5. If high-range water reducer is added to concrete on site, it may be used in conjunction with same water reducer added at batch plant. Concrete shall have slump of 3 inches ±½ inch before adding high range water reducing admixture at job site.

6. High-range water-reducing admixture shall be accurately measured and pressure injected into mixer as single dose by experienced technician. Standby system shall be provided and tested before each day’s operation of job site system.

7. Mix concrete at mixing speed for at least 30 mixer revolutions after adding high-range water reducer.

F. Retempering of partially hardened concrete or mortar will not be permitted.

G. Trial batch testing shall proceed as follows:

1. Before placing any concrete, testing laboratory designated by City’s Representative shall prepare trial batch of each class of “structural” or “premium” concrete based on preliminary concrete mixes submitted by Contractor and using aggregates, cement and admixtures proposed.

2. During trial batch, testing laboratory may adjust aggregate proportions to obtain required properties. Such adjustments shall be considered refinements to mix design and shall not justify extra compensation to Contractor.

3. All concrete shall meet specified requirements whether aggregate proportions are from Contractor’s preliminary mix design, or whether proportions have been adjusted during trial batch process.

4. Trial batch materials shall be sufficient to yield 3 drying shrinkage and 10 compression test specimens from each batch.

5. Test 5 cylinders at 7 days to establish 7-day average compressive strength.

6. Test remaining 5 cylinders no more than 28 days after molding.

7. Required average compressive strengths shall be as follows:

SPECIFIED

COMPRESSIVE
STRENGTH (f’c)
28-DAY LABORATORY TRIAL BATCH

COMPRESSIVE STRENGTH MINIMUM

TEST RESULTS
28-DAY FIELD TEST

COMPRESSIVE STRENGTH

MINIMUM TEST RESULTS
5-CYLINDER

AVERAGE
ANY SINGLE TEST 5-CYLINDER AVERAGE
0 < f’c < 3000 psi f’c +1000 psi f’c f’c + 600psi
3000 psi ≤ f’c < 5000
psi
f’c +1200 psi f’c f’c + 600psi
5000 ≤ f’c f’c +1400psi f’c f’c + 600psi

8. Do not place “structural” or “premium” concrete until mix design has been qualified under test criteria above. Should source of materials or established procedures change, City may require new trial batch testing.

9. Field trial batches may be placed in Work at designated locations accepted by City’s Representative where concrete of lower quality is required. For payment purposes, concrete so placed will be considered to be type of concrete specified at that location.

H. Measure cement and aggregate for mixing concrete using direct weighing equipment accessible to City’s Representative.

I. Tolerances of measurement equipment shall be as follows:

Page 1252 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 12 of 22

1. Cement: Use weighing equipment accurate to ±1% of total weight

2. Aggregate: Use weighing equipment accurate to ±3% of total weight

3. Admixtures: Use weighing equipment accurate to ±3% of total weight

4. Water: Use metering equipment accurate to ±3% of total volume J. Water feed control mechanism shall be capable of being locked in position to deliver constant flow of water to each batch of concrete. A positive quick-acting valve shall be used for cut-off in water line to mixer. Operating mechanism shall not allow leakage to occur when valves are closed.

K. Ready mixed concrete shall meet ASTM C94 and the following additional requirements.

1. Materials used in ready-mixed concrete shall be subject to continuous inspection at batching plant by City’s Representative.

2. Begin mixing as soon as possible after concrete is placed in contact with aggregate. In no case shall 30 minutes elapse before mixing proceeds.

3. Concrete mixer design and operation shall ensure properly mixed concrete with uniform distribution of ingredients. Maintain mixers properly and in working order.

4. Mixers shall have no aluminum parts in contact with concrete.

L. Transit mixers shall meet the following requirements:

1. Transport and deliver all ready-mixed concrete to site using agitating equipment. Do not use non-agitating equipment or combination truck and trailer equipment to transport or deliver ready-mixed concrete.

2. Deliver ready-mixed concrete to site and complete discharge within “maximum travel time” specified above after addition of cement to aggregates. Also, deliver mixed concrete to site and complete discharge before drum has been revolved the specified maximum number of revolutions.

3. Transit mixers shall conform to “Standards for Operation of Truck Mixers and Agitators of the National Ready-Mixed Concrete Association” and “Truck Mixer and Agitator Standards of the Truck Mixer Manufacturer’s Bureau.”

4. Transit mixers shall have electrically actuated counters to record number of revolutions of drum or blades. Counter shall be resettable recording type, and shall be mounted in driver’s cab. Counters shall be actuated at time of starting mixers at mixing speeds.

5. Mixers and agitators in transit mixers shall have metal plate or plates installed by Manufacturer in prominent place showing equipment manufacturer’s designated drum volume capacity, speed of rotation for agitating, and mixing speeds of mixing drum or blades.

6. Transit mixers shall have identification number painted on mixer that can be easily read from batching platform.

7. Volume of concrete introduced into mixer shall not exceed equipment manufacturer’s specified mixing capacity.

8. Empty mixer of any previously mixed load before adding new concrete.

9. Materials, including mixing water shall be in mixer drum before actuating counter to count rotations.

10. Each batch of concrete shall be properly proportioned and mixed in transit mixer for 70 to 100 revolutions of drum or blades at rotation rate designated by equipment manufacturer. Additional mixing, if any, shall be at agitating speed designated by equipment manufacturer unless otherwise accepted by City’s Representative.

11. Truck mixers and their operation shall ensure concrete throughout mixed batch is discharged within acceptable limits of uniformity of consistency, mix and grading.

12. Adequate control of ready-mixed concrete may require addition of water into batch at discharge point, in which case water shall be mixed for at least 30 revolutions at equipment manufacturer’s designated mixing speed.

Page 1253 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 13 of 22

13. Slump tests taken at approximately ¼ point and ¾ points of load during discharge shall give slumps within 2 inches of each other when the specified slump is more than 3 inches and within 1 inch when the specified slump is 3 inches or less. Mixers failing to meet this requirement shall not be used on job until causing condition is corrected and satisfactory performance is verified on-site using additional slump tests. Mechanical parts of failing mixer, including water measurement and discharge apparatus, blades, rotation speed and drum clearances shall be serviced and checked before further attempt to use equipment.

14. Each delivery of ready-mixed concrete shall be accompanied by delivery ticket furnished to City’s Representative as described in Paragraph 1.6 above.

M. Paving and stationary mixers shall meet the following requirements:

1. Equip paving and stationary mixers with accurate timing device designed and constructed to lock discharge lever. Regulation of this device shall be under supervision of City’s Representative.

2. Provide water control equipment with each concrete mixer.

3. Place proper proportions of aggregate, cement, and water for each concrete batch into mixer for at least 1 minute (1½ minutes for reinforced concrete.)

4. Mixer rotating speed shall conform to that recommended by Manufacturer. Total volume of any batch shall not exceed water level copacity of mixer or Manufacturer’s specified mixer capacity.

N. Machine mixing is required except where it is obviously impractical, in which case City’s Representative may accept hand-mixing.

O. Hand-mixing will be accepted when less than 1 cy concrete is required.

1. Do not use hand-mixing methods which allow loss of mixing water.

2. Hand-mix concrete on water-tight platform or in mortar box in batches not to exceed ⅓ cubic yard each.

3. Spread aggregates in uniform layer.

4. Evenly distribute required quantity of cement over aggregates.

5. Turn entire batch with shovels until ingredients are thoroughly blended before adding water.

6. After adding proper amount of water, turn batch with shovels again until uniform consistency is obtained.

P. Compartments of trucks or other equipment used to transport dray aggregate and cement, or mixed concrete shall be constructed to prevent loss or leakage of contents during charging, transit, or discharging.

Page 1254 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 14 of 22
PART 3 - EXECUTION

3.1 Preparation
A. Make field measurements needed to install Concrete structural systems before submitting shop drawings or ordering. Make minor changes in dimensions and alignments as needed to avoid utilities or structural conflicts.

B. No concrete shall be placed except in the presence of a duly authorized representative of the City’s Representative. The Contractor shall notify the City’s Representative in writing at least 24 hours in advance of placement of any concrete.

C. Set and secure in the forms all reinforcement, anchor bolts, sleeves, inserts and similar items where shown or by shop drawings and shall be acceptable to the City’s Representative before placing any concrete. Accuracy of placement is the responsibility of the Contractor.

D. Before placing concrete within forms, each trade having embedded items, including water stops within forms and affected by concrete placement shall certify all items are properly located, placed and braced.

E. Earth surfaces shall be thoroughly wetted by sprinkling before placing concrete. At time of concrete placement, ground surface shall be moist, but free from standing water, mud and debris.

F. Cold joints in concrete shall be deemed to occur whenever placement of concrete is interrupted for any reason so new concrete is neither incorporated integrally with previously placed concrete in opinion of City’s Representative nor keyed in place with preformed construction joint shown on Contract Documents or accepted shop drawings. Prepare horizontal surfaces of cold joints as follows:

1. Compacting and roughen horizontal with minimum ¼” amplitude profile for good bond.

2. Clean tooled joint surface of all laitance, loose or defective concrete and foreign matter by hydroblasting or sandblasting to expose aggregate.

3. Thoroughly wash hydro-blasted or sandblasted surface with clean water.

4. Remove all ponded water from surface of construction joints.

5. Coat joint surface with epoxy-bonding agent unless otherwise shown.

G. Construction joints shown on Contract Documents and accepted shop drawings may be made as shown with provision of keys or other locking shapes to secure proper union with subsequent work.

H. Before placing concrete, secure inspection of steel reinforcement and obtain acceptance by City’s Representative at least 4 hours before placing concrete.

I. Before placing concrete, thoroughly clean of all dirt, grease, loose scale and rust, grout, mortar and other foreign substances the surfaces of all metalwork to be in contact with concrete.

J. Before placing concrete, provide dewatering, runoff diversion and protection as needed to ensure proper and water-free environment suitable for concrete hardening and curing. Do not place concrete underwater or in spaces where standing water is present. Protect uncured concrete from exposure to rain, runoff or groundwater. Do not allow water to flow over the surface of any concrete in such manner and at such velocity as to injure the surface finish of the concrete.

K. Before placing concrete, clean all dried grout from forms and embedded items encrusted with dried grout from concrete previously placed in the vicinity or adjacent to the proposed concrete placement.

L. Corrosion Protection: Pipe, conduit, dowels and other ferrous items required to be embedded in concrete construction shall be so positioned and supported before placement

Page 1255 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 15 of 22
of concrete that there will be a minimum of 2 inches clearance between said items and any part of the concrete reinforcement. Securing such items in position by wiring or welding them to the reinforcement will not be permitted.

M. Notify City’s Representative in writing at least 24 hours before placing any concrete. Do not place concrete except when City’s Representative or his duly authorized representative is present.

N. Order of placement of concrete shall be acceptable to City’s Representative. To minimize shrinkage effects, place concrete in units bounded by construction joints shown in shop drawings. Placement shall occur such that each unit shall cure at least 7 days for hydraulic structures and 3 days for all other structures before contiguous units are placed, except corner sections of vertical walls shall not be placed until the 2 adjacent wall panels have cured at least 14 days for hydraulic structures and 7 days for all other structures.

O. Provide sufficient illumination in interior of all forms so concrete at places of deposit is visible from deck or runway.

P. Schedule concrete placement during evening or morning hours or provide ice or pre-cooled aggregate as needed to maintain temperature of concrete within the following ranges immediately before placement.

1. Concrete less than 12 inches thick: 55°F to 90°F

2. All other concrete: 50°F to 90°F

3. When concrete temperature exceeds 80°F, only set retarding admixtures shall be used.

4. When concrete temperature exceeds 85°F, time between introducing cement to aggregates and discharge shall not exceed 45 minutes.

5. No additional compensation will be made to contractor for measures used to maintain concrete temperature within specified limits.

Q. Hot weather placement shall proceed as follows:

1. Comply with ACI 305.

2. From initial placement through curing, protect concrete from adverse effects of high temperature, low humidity and wind.

R. All ends of chutes, hopper gates, and all other points of concrete discharge shall be arranged so concrete passing from them will flow continuously into receiving vessel without separation. Conveyor belts, if used, shall be wiped clean by device operated so mortar adhering to belt is not wasted and shall be of type acceptable to City’s Representative.

Chutes shall be no longer than 50 feet long. Slopes of chutes shall permit free and continuous flow of concrete being placed.

3.2 Installation/Application
A. Refer to Sections 01 73 00, 01 73 24, and 01 73 33 for basic execution and installation requirements.

B. Furnish and install concrete at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 19 “Concrete”

3. Other applicable building and CalGreen code requirements

4. ACI 301 Structural Concrete for Buildings Chapter 8.

5. ACI 318 Building Code Requirements for Reinforced Concrete

6. Manufacturer’s installation and warranty requirements

7. Standard Specifications for Public Works Construction Section 303 “Concrete and Masonry Construction.”

Page 1256 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 16 of 22
D. Where hydrophobic waterproofing admixtures are added, admixture Manufacturer’s installation and warranty requirements shall also be followed.

E. Refer variances between above documents and Contract Documents to City’s Representative.

F. Pumping of concrete will only be permitted if satisfactory end results are obtained.

1. For redundancy, provide standby pump on site or provide pumping equipment with two cylinders, designed to operate with one cylinder only.

2. Replace pumping equipment or hoses that fail to function properly.

3. Minimum diameter of hose and conduits shall be in accordance with ACI 304

4. Do not use aluminum conduits to convey concrete.

5. Concrete samples for slump, air content and test cylinders will be taken at placement (discharge) end of line.

G. Do not drop concrete through reinforcing steel or into any deep form, nor place concrete in any form in manner permitting accumulation of mortar on surfaces above placed concrete. If necessary, use hoppers or vertical ducts of canvas, rubber or metal to convey concrete to place of final deposit without separation or splashing. Free fall shall not exceed 4 feet below ends of ducts, chutes or buggies except in column forms. In no case shall concrete be displaced horizontally in forms by more than 6 feet after depositing. Deposit concrete in uniform horizontal layers not deeper than 2 feet. Avoid inclined layers or inclined construction joints except where required for sloping members. Place each layer while previous layer is still soft. Rate of placement in forms shall not exceed 5 vertical feet of rise per hour.

H. Place thrust blocks behind all non-welded, non-flanged or non-restrained valves, fittings, reducers, tees, crosses, bends and dead ends. Place thrust blocks as follows:

1. Wrap fittings and valves, leaving stainless steel bolts exposed. Do not allow concrete to contact flanges or bolts.

2. City’s Representative shall inspect formwork and be present throughout placement of concrete.

3. Unless otherwise shown on drawings, provide bearing surface not less than 3 times pipe diameter in all directions.

4. Thrust block shall bear against undisturbed soil.

5. In soft or disturbed soil, increase bearing surface as directed by City’s Representative.

I. Concrete in ramps and sloping slabs shall be placed uniformly from bottom to top for full width of placement. As work progresses, vibrate concrete and carefully work it around reinforcement. Screed ramp surface in an up-slope direction.

J. Thoroughly settle, compact and consolidate concrete in forms or excavations throughout entire depth of concrete layer being placed.

1. Consolidate concrete into dense, homogeneous mass, filling all corners and angles, thoroughly embedding reinforcement and embedments, eliminating all rock pockets and bringing only a slight excess of water to exposed concrete surface during placement.

2. Vibrators shall be Group 3 per ACI 309. Use high-speed power vibrators (8,000 rpm to 12,000 rpm) of immersion type in sufficient number and with (at least one) standby units as required to accomplish specified results within 15 minutes after concrete is deposited.

Group 2 vibrators may be used only at specific locations when accepted by City’s Representative.

3. Concrete in walls shall be internally vibrated and at same time, rammed, stirred, or worked with suitable appliances, tamping bars, shovels, or forked tools until it completely fills forms or excavations and closes snugly against all surfaces. Do not place subsequent layers of concrete until previously placed layers have been worked thoroughly as specified. Keep vibrating head from contact with form surfaces.

Page 1257 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 17 of 22

4. Do not vibrate concrete excessively or work it in any manner causing segregation of its constituents.

K. Horizontal surfaces of concrete shall be level whenever run of concrete is stopped. To ensure level, straight joint on exposed surfaces of walls, tack wood strip at least ¾ inch thick to forms on these surfaces. Carry concrete about ½ inch above underside of strip. About one hour after concrete is placed, remove wood strip. Using trowel, remove irregularities in edge formed by strip, and remove all laitance.

L. Concrete finishing shall proceed as follows:

1. As soon as forms are removed, examine all exposed surfaces and rub or grind all fins, bulges or ridges in satisfactory method to provide smooth, uniform and continuous surface.

2. Do not plaster or coat surfaces to be smoothed.

3. Do not use aluminum finishing tools.

4. Finished surfaces shall present finished, smooth, continuous hard surface.

5. Tolerances of finished concrete shall be as shown in Section 03 10 00.

6. City’s Representative will inspect finished surface for voids, holes, honeycombing, rock pockets or similar depression defects. Damage shall be repaired as specified.

7. Repair surface defects within 2 hours of form removal.

8. Surface defect repairs that cannot be made within 2 hours following form removal shall be delayed until after curing compound has been applied. In such case, area involved shall then be wet sandblasted to remove curing compound following which repairs shall be made as specified, and curing compound shall be reapplied over repaired area.

M. Repair defective work at Contractor’s expense as follows:

SURFACE DEFECTS

DEFECT REPAIR METHOD
Tie Rod Cone Holes Ream circular holes with suitable toothed reamers to leave surfaces of holes clean and rough. Do not ream rectangular holes or holes deeper than their least surface dimension.

Repair holes in approved manner with dry-packed cement grout.

Cracks in Retaining
Walls and Walls in
Contact with Backfill
Apply waterproofing membrane to cover fill side of wall. or
Vee cracks on water-bearing face with suitable tools.

Fill with construction joint sealant designed for water-bearing structures Cracks in
Water-bearing
Structures
Vee cracks on water-bearing face with suitable tools.

Fill with construction joint sealant designed for water-bearing structures.

Minor Voids, Holes
or Honeycombing
Cut back from trueline at least ½ inch over entire area. Use chipping and cutting tools as needed.

Do not feather edges.

Remove 1/32-inch of surface film from hardened and cured portions by wet sandblast.

Remove all laitance or soft material before bonding.

Moisten exposed surface but do not wet it enough to overcome suction needed for bond.

Mix for repair shall be 1 sack cement to 3 cubic feet sand with Atlas white Portland cement added as needed on interior walls to make patch match finish.

Apply bonding agent if required.

Apply repair mix.

HOLES EXTENDING THROUGH CONCRETE

DEFECT REPAIR METHOD
Small Holes less
than 12 inches in
least dimension
Fill hole with non-shrink grout.

Where face of repaired surface is exposed to view, hold grout back 2 inches from finished surface.

Patch remaining 2 inches as described above for “Minor Voids, Holes or Honeycombing.” For water bearing structures, apply bentonite
material around perimeter of hole.

Page 1258 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 18 of 22
Large Holes greater
than 12 inches in
least dimension
Chip keyway into edge of opening.

Repair keyed opening as described above for “Small Holes.” Large Holes greater
than 24 inches in
least dimension
Chip keyway into edge of opening
If reinforcing is not present, dowel and epoxy reinforcing of size matching reinforcing in existing wall across opening in both directions.

Repair keyed and reinforced opening as described above for “Small Holes.”.

N. Perform all repairs using approved methods that do not disturb bond or cause sagging or horizontal fractures. Finished surfaces shall be cured using methods and duration similar to that for adjacent concrete.

O. Concrete finishing of unformed surfaces shall proceed as follows:

1. After proper and adequate vibration and tamping, bring unformed surfaces of slabs, floors, walls and curbs to uniform surface with suitable tools.

2. Screed concrete and then immediately treat with liquid evaporation retardant. Reuse retardant as needed after each operation to prevent drying shrinkage cracks.

3. Classes of unformed surfaces shall be as follows:

FINISH LOCATION DESCRIPTION
U1
(screeded
finish)
Grade slabs and foundations
to be covered with concrete or
fill material
Sufficient leveling and screeding to produce even, uniform surface with surface irregularities not exceeding 3/8 inch. No further special finish.

U4
(hairbroom
finish)
Non water-bearing slabs
Water bearing slabs with
slopes >10%
After completing steel trowel finish U3, add light hairbroom finish with brooming perpendicular to drainage unless otherwise shown. Resulting surface shall be rough enough to provide nonskid finish.

P. Do not backfill against walls until concrete has obtained 100% of specified 28-day compressive strength.

Q. Concrete finishing of formed surfaces shall proceed as follows:

1. Repair surface defects.

2. Immediately after stripping forms, inspect concrete surface. Repair poor joints, voids, rock pockets and other defective areas.

3. Fill form tie holes as directed in Section 03 10 00.

3.3 Field Quality Control
A. Refer to Section 03 10 00 for field testing and inspection of formwork.

B. Refer to Section 03 15 00 for inspection of concrete accessories and joints.

C. Refer to Section 03 20 00 for field testing and inspection of steel reinforcement.

D. Refer to Section 03 39 00 for field testing and inspection of curing.

E. CBC Chapter 17 special inspection shall only be required for Class A “structural” concrete and concrete having specified compressive strength f’c exceeding 2500 psi.

F. Maintain placing record on-site showing time and date of placement of all concrete having specified compressive strength f’c exceeding 2500 psi as required in CBC Section 1704.4.2.

G. Special inspection and field testing of Class A concrete required by Chapter 17 of CBC (Table 1704.4) shall be completed by ICBO-certified special inspector selected by City and shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST
TEST
PAID
FOR BY

RETESTS

PAID FOR
BY

Page 1259 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 19 of 22

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST
TEST
PAID
FOR BY

RETESTS

PAID FOR
BY
Class A
Concrete and
Concrete
having f’c
exceeding
2500 psi
Design Mix
Verification
ACI 318, Ch 4 & 5.2-5.4, CBC
1904.25.25, 1913.2, & 1913.3
Periodic per CBC
Table 1704.4
City Contractor
to
reimburse
City for
costs of first
deputy
inspector if
reinspection
is required
Slump ACI 318 Sec. 5.6& 5.8, ASTM
C31, ASTM C172 & CBC
1913.10 Slump per ASTM C143
Continuous per CBC
Table 1704.4 taken
at at ¼ point and ¾
point of batch and at
time fresh concrete is
sampled to fabricate
cylinders for strength
tests
Air Content ACI 318 Sec. 5.6& 5.8, ASTM
C31, ASTM C172 & CBC
1913.10 Air content per ASTM
C173 or C231
Temperature ACI 318 Sec. 5.6& 5.8, ASTM
C31, ASTM C172 & CBC
1913.10
Proper
Placement of
Concrete
ACI 318 Sec. 5.9-5.10, CBC
1913.6, 1913.7,& 1913.8
Continuous per CBC
Table 1704.4
Verification of
in-situ
Concrete
Strength Prior
to Removal of
Shores and
Forms
ACI 318, Sec. 6.2
See below for concrete strength
test requirements
Periodic per CBC
Table 1704.4
Curing
Temperature
and
Techniques
ACI 318, Sec. 5.11-5.13, & CBC
1913.9
Periodic per CBC
Table 1704.4
H. Additional field testing of concrete shall include:

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST
TEST
PAID
FOR BY

RETESTS

PAID FOR
BY
Concrete
Compressive
Strength f’c
Trial Batch 1
st 3 cylinder tests at 7 days
2 nd 3 cylinder tests at 28 days
average compressive strength at
28 days shall exceed 125% of
specified compressive strength
f’c
3 drying shrinkage
samples and 10
compression test
cylinders for each
class or mix of
concrete used
Contractor Contractor
Cylinder
Sampling
ASTM C172 Sample each 100 cy
concrete and each
separate mix design
placed on any day
Contractor Contractor
Cylinder
Testing of
Compressive
Strength f’c
Field Cylinders per ASTM C31
Section 9.2
Make six 6-inch
diameter x 12-inch
high cylinders per
100 cy concrete and
separate mix design
placed on any day
1 st test at 7 days
2 nd test at 28 days
Save remaining
cylinders to verify test
results as directed.

City Contractor
Laboratory Cylinders per ASTM
C192
Testing per ASTM C39 Average
of two cylinders
Evaluation per ACI 214 & ACI
318 Chapter 5 “Concrete
Quality”
Standard deviation of test results
shall not exceed 640 psi.

Page 1260 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 20 of 22

ITEM TEST FOR

TEST STANDARD
(ASTM OR OTHER TEST

STANDARD) FREQUENCY
FIRST
TEST
PAID
FOR BY

RETESTS

PAID FOR
BY
Test Core
Testing of
Compressive
Strength f’c
Take test cores per ASTM C42 if
minimum strengths fall below
those specified.
3 cores per test as
directed
Contractor Contractor
Concrete tested by coring shall
be acceptable if average f’c of 3
cores equals 85% of specified f’c
and no single core strength is
less than 75% of specified f’c
Concrete Flexural
Strength
ASTM C78 As directed Contractor Contractor
Unit Weight
Yield
ASTM C138 As directed Contractor Contractor
Drying
Shrinkage
California Test 530 As directed Contractor Contractor
Concrete
Finishing
Dimensional
Tolerance
ACI 117 and Section 03 10 00 Inspection at City’s
discretion
City City
Surface
Defects
Holes larger than ½ inch
diameter or greater than ¼ inch
deep are defined as surface
defects. More stringent
requirements exist for some
specified finishes.

As directed City City
Permeability
and Cracking
in WaterBearing
Structures
Section 03 08 50 As directed City City
Cracking in
Flatwork and
Non-Waterbearing
Structures
No cracks wide enough to stick
a dime in except at expansion or
contraction joints.

As directed City City
Concrete 11-month
Warranty
Inspection
Demonstrate compliance to
Contract Documents and
Manufacturer’s printed literature
1 test City Contractor
I. Concrete samples for batch testing shall be furnished in steel drums at no cost to City.

J. In lieu of trial batch testing, Contractor may submit previously designed, tested and successfully used concrete mixes using materials similar to those intended for this project, together with at least 3 certified test reports of 28 day strength of proposed concrete mix.

K. Laboratory used for field testing shall meet or exceed requirements of ASTM C1077.

L. Contractor shall provide concrete for testing at no charge to City, and shall assist City’s Representative and laboratory personnel in obtaining samples, and disposal and cleanup of excess material.

M. Statistical analysis of compression test results will be performed according to ACI 214.

Standard deviation of test results shall not exceed 640 psi when ordered at equivalent water content as estimated by slump. When said standard deviation exceeds 640 psi, increase average strength for which mix is designed as needed to satisfy statistical requirement that:

1. Probability of any test being more than 500 psi below specified strength < 1%.

2. Probability of average of any 3 consecutive tests being below specified strength <1%.

Page 1261 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 21 of 22
Required average strength shall be calculated using Criterion Number 3 of ACI 214 using actual standard deviation.

N. All concrete which fails to meet ACI requirements and these Specifications is subject to rejection, removal, and replacement at no increase in cost to City.

O. In lieu of removing and replacing slightly deficient concrete having 85% or more of specified strength, City may, at their sole discretion, elect to reduce payment due to Contractor for substandard concrete as described in Caltrans Standard Specification §90-9 “Compressive Strength.”

3.4 Cleaning
A. Wash out chutes, shovels, finishing trowels and all other equipment that has been in contact with wet concrete at a designated concrete washout area.

B. Do not discharge or deposit wet concrete, debris, or other concrete washout effluent on bare ground, on area tributary to storm drain or natural channel or in any storm drain facility.

C. Dispose of concrete and concrete waste in accordance with all pollution prevention laws and regulations.

D. Refer to Section 01 74 00 for cleanup and disposal requirements.

3.5 Protection
A. Protect all concrete against injury until final acceptance by City.

B. Protect fresh concrete from damage due to impact, overstress, vandalism and weather, including precipitation or extremes in temperature or humidity until final acceptance.

C. Prevent drying of concrete and avoid roughening or otherwise damaging concrete surface.

D. Any new concrete not complying with these specifications shall be satisfactorily repaired or removed and replaced prior to final acceptance except where City agrees to reduce payment as described above.

END OF SECTION

Page 1262 of 1826 ends

11-17-vw 03 30 00 – Cast-in-Place Concrete - 22 of 22

THIS PAGE INTENTIONALLY BLANK

Page 1263 of 1826 ends

3-18-vw 03 35 00 –Concrete Finishing - 1 of 6
SECTION 03 35 00

CONCRETE FINISHING
PART 1 - GENERAL

1.1 Work Included
A. Materials, testing, and installation of concrete finishing.

B. Refer to Section 03 10 00 for concrete form removal.

C. Refer to Section 03 30 00 for cast-in-place concrete.

D. Refer to Section 03 39 00 for concrete curing, floor hardeners, and dampproofing.

1.2 Related Work
A. Section 01 22 00: Unit Prices
B. Section 01 33 00: Submittal Procedures
C. Section 01 40 00: Quality Requirements
D. Section 01 65 00: Product Delivery Requirements
E. Section 01 66 00: Product Storage and Handling Requirements F. Section 01 73 00: Execution
G. Section 01 74 00: Cleaning and Waste Management
H. Section 03 10 00: Concrete Forming
I. Section 03 30 00: Cast-in-Place Concrete
J. Section 03 39 00: Concrete Curing
K. Section 32 12 16: Asphalt Paving Systems Conforming to Greenbook Specifications L. Section 32 13 73: Concrete Paving Joint Sealants

1.3 System Description
A. Finish concrete as specified herein and shown on Plans.

1.4 Quality Assurance
A. Use adequate numbers of skilled workmen trained and experienced in necessary trades and crafts and completely familiar with specified requirements and methods for proper performance of Work of this section.

1.5 References
A. ACI 117 Standard Tolerances for Concrete Construction Materials B. California Building Code (CBC)
C. California Green Building Standards Code (CALGreen Code) D. SSPWC Standard Specifications for Public Works Construction (Greenbook) §303 “Concrete and Masonry Construction.”
E. USBR M47 Repair of Concrete

1.6 Unit Prices
A. Payment for Work in this section shall be included as part of lump-sum or unit-price bid amount for which such Work is appurtenant.

B. Refer to Section 01 22 00 for measurement and payment clauses for concrete finishing.

PART 2 - PRODUCTS

2.1 Materials

Page 1264 of 1826 ends

3-18-vw 03 35 00 –Concrete Finishing - 2 of 6
A. Refer to Section 01 61 00 for basic requirements for products and materials.

B. Materials for concrete structural systems shall be:

ITEM MATERIAL SPECIFICATION
Grout for Smooth Concrete
Finish
1 part Portland cement (½ gray & ½ white Portland cement) White Portland cement to be Atlas white or equal.
1 part fine sand passing No. 16 sieve
Calcium chloride (add amount equal to 5% of cement by
volume.)
Sufficient water to provide consistency of thick paint.

C. Materials furnished for Work shall conform to requirements of ACI 301 §201, §203, and §204 as applicable.

PART 3 - EXECUTION

3.1 Preparation
A. Schedule concrete placements so newly placed concrete will not be damaged by blasting or other operations.

B. Protect uncured concrete from exposure to rain, runoff or groundwater.

3.2 Installation
A. Refer to Section 01 73 00 for basic execution and installation requirements.

B. Furnish and install concrete at locations shown on Plans and Submittals.

C. The following installation standards shall be followed:

1. Applicable OSHA and Cal OSHA regulations

2. California Building Code Chapter 19 “Concrete”

3. Other applicable building and CalGreen code requirements

4. SSPWC Standard Specifications for Public Works Construction (Greenbook) §303 “Concrete and Masonry Construction.”
D. Refer variances between above documents and Contract Documents to City’s Representative.

E. Horizontal surfaces of concrete shall be level whenever run of concrete is stopped. To ensure level, straight joint on exposed surfaces of walls, tack wood strip at least ¾” thick to forms on these surfaces. Carry concrete about ½” above underside of strip. About one hour after concrete is placed, remove wood strip. Using trowel, remove irregularities in edge formed by strip, and remove laitance.

F. Protect surfaces of completed concrete placements from foot traffic until surface will not be marred by footprints. Provide planked walkways across fresh concrete as required.

G. Concrete finishing shall proceed as follows:

1. As soon as forms are removed, examine exposed surfaces and rub or grind fins, bulges or ridges in satisfactory method to provide smooth, uniform and continuous surface.

2. Do not plaster or coat surfaces to be smoothed.

3. Do not use aluminum finishing tools.

4. Finished surfaces shall present finished, smooth, continuous hard surface.

5. Tolerances of finished concrete shall be as shown in Section 03 10 00.

6. City’s Representative will inspect finished surface for voids, holes, honeycombing, rock pockets or similar depression defects. Damage shall be repaired in presence of City’s Representative as specified.