Implementation and Administrative Procedures HEIGHTS
6-9
6.9 ADMINISTRATIVE ACTIONS AND MINOR MODIFICATIONS
Certain minor changes to provisions in the Specific Plan may be made administratively by the Planning and Development Director, subject to appeal to the Planning Commission and subsequently, the City Council. Such minor modifications do not require additional environmental review.
All minor modifications must be approved by an administrative amendment process subject to the Planning Director’s approval. To request an administrative amendment, the applicant shall file a written request with the Planning and Development Department with the proposed revisions. Text to be deleted shall be shown in a strikethrough format. New text to be added shall be shown in red text and underlined. Upon approval of the administrative amendment, the applicant shall be required to submit final replacement copies of the revised Specific Plan pages with one electronic copy to the Planning and Development Department.
All minor modifications must comply with the following requirements:
• The change is consistent with the purpose and intent of the Skyline Heights Specific Plan. • The total number of dwelling units within the Skyline Heights Specific Plan area shall not exceed 276 dwelling units.
• The public health, safety and welfare shall not be jeopardized by the proposed modifications. • No additional potentially significant environmental impacts are expected to occur due to the proposed modifications, except as evaluated in a certified EIR for the project.
The following modifications constitute “administrative changes” that are in substantial conformance with the approved Skyline Heights Specific Plan and may be approved without amending the Specific Plan subject to the administrative amendment process detail in Section 6.9 of this Specific Plan.
A) Addition of new information or data to the Specific Plan maps, exhibits, and/or text which does not change the effect of any concepts or regulations.
B) Adjustments to horizontal and vertical roadway alignments to respond to actual ground conditions, provided that the changes do not adversely affect public safety.
C) Changes to the design of the roadway cross sections, provided that the streets have adequate capacity to handle the anticipated volumes of traffic and the design changes are deemed acceptable by the City Engineer.
D) Changes to the community infrastructure, such as drainage, streets, water, and sewer systems which do not have the effect of increasing or decreasing development capacity in the Specific Plan area, nor change the concepts of the Specific Plan.
E) Slight modifications to the Specific Plan area boundaries that respond to more accurate or recent data or actual on-site conditions, but which do not result in an increase in environmental impacts already assessed in the EIR for Skyline Heights.
F) Adjustments to Planning Area sizes and configurations by up to 10%, provided that a site plan is submitted to and approved by the Planning Director and the City Engineer. The site plan shall depict the location of all Planning Areas and the relationships of the Planning Areas to one another. In evaluating the site plan, all the following conditions must be met for the site plan to be approved:
1) The Planning Area modifications would not detrimentally alter the planned circulation system.
6-10
2) The Planning Area modifications would not result in any new environmental impacts that were not previously accessed in the certified EIR for Skyline Heights. 3) There is no increase in the Planning Area density in excess of the maximum overall General Plan density permitted in the Planning Area(s) as a result of the change in Planning Area boundaries.
G) Minor modifications to the architectural or landscape design guidelines necessary to respond to site conditions, community expectations, market conditions, and/or new architectural trends.
H) Minor modifications to the grading, water, sewer and/or drainage plan(s) that improve efficiency, the requirements of easements holders, adjacent landowners or service providers, or are necessary to respond to site conditions, and as approved by the City Engineer.
I) Modifications to the phasing plan as long as the related infrastructure are adequately in place.
J) Adjustments to the Fuel Management Program, as described in Section 5.4, Fuel Modification of this Specific Plan.
K) Minor modifications to parcel lines that are necessary to respond to site conditions or unique engineering concerns, and which do not substantially change the overall land use plan concept.
L) Other items determined to be appropriate by the Planning Director.
6.10 SPECIFIC PLAN AMENDMENTS
This Specific Plan may be amended at any time in the same manner and by the same process by which the plan was originally adopted, as described in the CMC. Said major amendment or amendments shall not require a concurrent General Plan Amendment unless a land use change is involved. The City’s standard environmental review procedures shall be followed.
A) The project master developer, project owner, merchant builder, city staff, or any member of the public may initiate an amendment to the adopted Specific Plan at any time.
B) An Amendment to the Specific Plan text and maps may be initiated by the City Planning Commission or the City Council, at their discretion.
C) A concurrent General Plan Amendment may be required by the City of Corona if the proposed amendment would substantively affect the General Plan goals, objectives, policies, programs or land uses for the Skyline Heights Specific Plan area.
D) All Specific Plan Amendments shall be subject to CEQA requirements and any applicable City of Corona environmental guidelines.
E) The Planning Commission shall review all proposed major amendments to the adopted Specific Plan. Upon the close of the required public hearing, the Planning Commission shall make a motion to approve the Specific Plan Amendment, deny the Specific Plan Amendment, or send the Specific Plan Amendment back to City staff for further refinement. The Planning Commission shall forward its recommendation and findings to the City Council for further determination and action.
F) The City Council shall review the Planning Commission’s findings and recommendations. Upon the close of the required public hearing, the City Council shall act by ordinance to adopt, reject or modify the proposed Specific Plan Amendment.
G) Amendment of Specific Plan text shall be subject to the same findings as prescribed for initial enactment of a Specific Plan, pursuant to the CMC Chapter 17.53.
General Plan Consistency Analysis HEIGHTS
7-1
SECTION 7 - GENERAL PLAN CONSISTENCY ANALYSIS
7.1 RELATIONSHIP TO THE GENERAL PLAN
The City of Corona and State law requires that the content of a Specific Plan include a discussion of the relationship of the Specific Plan to the goals and policies of the elements of the City’s General Plan.
This section provides the analysis necessary to demonstrate that the Skyline Heights Specific Plan is consistent with, and results in the implementation of, applicable goals and policies of the General Plan of the City of Corona.
7.2 LAND USE GOALS
GOAL LU-1: A community that contains a diversity of land uses that support the needs of and provides a high quality of life for its residents, sustains and enhances the City’s economy and fiscal balance, is supported by adequate community infrastructure and services, and is compatible with the environmental setting and resources.
CONSISTENCY: SP 2025-0001 is consistent with Goal LU-1 as the Specific Plan provides a master-planned development with 276 single-family homes and 11.42 acres of combined public and private park facilities which provides a high-quality community for its residents. SP 2025-0001 will provide infrastructure improvements, such as roadways, water, and sewer facilities necessary to sufficiently serve the project and not adversely impact the City’s fiscal condition, as well as ensure an appropriate and respectful interface with the environmental setting of the project site is provided.
GOAL LU-3: A development pattern that retains and complements the City’s important residential neighborhoods, commercial and industrial districts, and open spaces.
CONSISTENCY: SP 2025-0001 is consistent with Goal LU-3 as this Specific Plan establishes a development pattern that retains and complements the existing surrounding neighborhoods and open spaces. SP 2025-0001 provides 122 acres of natural open space that abut open space to the north and east. SP 2025-0001 provides 276 residential homes and abuts existing residential neighborhoods to the south and east.
GOAL LU-7: Residential neighborhoods that contain a diversity of housing and supporting uses to meet the needs of Corona’s residents that are designed to enhance livability and a high quality of life.
CONSISTENCY: SP 2025-0001 is consistent with Goal LU-7 as this Specific Plan offers a variety of residential product types, including detached and cluster products, designed to enhance livability, attainability and assist with meeting the housing needs of the City’s existing and future residents.
GOAL LU-9: Development of new residential neighborhoods that complement existing neighborhoods, contain a mix of neighborhood-supportive land uses, exhibit high quality architectural design, and ensure a high level of livability for their residents.
CONSISTENCY: SP 2025-0001 is consistent with Goal LU-9 as this Specific Plan establishes a residential neighborhood that complements existing low density single-family neighborhoods to the south and east. SP 2025-0001 contains supportive recreational land uses and provides high-walkability design standards to ensure a high level of livability for residents.
7-2
GOAL LU-16: Open spaces that provide Corona’s residents with opportunities to enjoy the natural environment, provide visual “relief ” from urban development, protect significant plant and animal habitats, and protect development from natural environmental hazards.
CONSISTENCY: SP 2025-0001 is consistent with Goal LU-16 as this Specific Plan preserves approximately 122 acres of natural open space within the western, eastern, and southern portions of the project site. The open space provides visual relief from surrounding development, protects various plan and animal habitats as analyzed in the certified EIR, and provides a buffer for the Skyline Heights development from natural environmental hazards.
GOAL LU-21: Development of a well-designed master-planned community through adoption and implementation of a specific plan with uses that would complement adjoining uses.
CONSISTENCY: SP 2025-0001 is consistent with Goal LU-21 as this Specific Plan provides a well-designed master-planned community consisting of 276 single-family homes, which would be supported by 11.42 acres of combined private and public park facilities and 122 acres of natural open space via the adoption and implementation of this Specific Plan. SP 2025-0001 is designed to establish land uses that are consistent with and complementary to surrounding existing uses.
7.3 COMMUNITY DESIGN
GOAL CD-1: Public street landscapes that unify the City of Corona and contribute to the unique identity of its neighborhoods, districts, and public places.
CONSISTENCY: SP 2025-0001 is consistent with Goal CD-1 as this Specific Plan provides landscape design guidelines, as well as a plant palette, which establishes a cohesive theme for the Skyline Heights project. SP 2025-0001 provides street sections and landscape concepts in Section 5, Community Design Guidelines, designed to complement the Skyline Heights architecture.
GOAL CD-2: Entries that are well-defined by signage, landscape, lighting, and other visual landmarks that provide a clear sense of arrival into and identity for the City of Corona.
CONSISTENCY: SP 2025-0001 is consistent with Goal CD-2 as this Specific Plan provides entry monumentation at two locations, including primary monumentation at Foothill Parkway and “B” Street and secondary monumentation at 2025-0001. These entries will be well-defined by monument signage, landscaping, and lighting, as described in Section 5, Community Design Guidelines.
GOAL CD-3: Well designed, high quality, and distinctive public and private signage that identifies key City districts, public facilities, buildings, and facilitates wayfinding.
CONSISTENCY: SP 2025-0001 is consistent with Goal CD-3 because this Specific Plan provides well-designed, high-quality, and distinctive signage that identifies the Skyline Heights Park amenities and facilitates wayfinding in the community.
General Plan Consistency Analysis HEIGHTS
7-3
GOAL CD-4: A network of trails and greenways that interconnect Corona’s parklands, open spaces, and drainages that provide hiking and bicycle opportunities and access into surrounding open spaces and natural areas.
CONSISTENCY: SP 2025-0001 is consistent with Goal CD-4 as this Specific Plan establishes approximately 11.42 acres of combined private and public park facilities, which will be interconnected by multiple bike and multi-use trails.
These trails will also complement the on-site undisturbed open space and provide access to existing surrounding trails.
7.4 HOUSING
GOAL H-1: Promote and maintain a balance of housing types and corresponding affordability levels to provide for the community’s demands for housing within all economic segments of the City.
CONSISTENCY: SP 2025-0001 is consistent with Goal H-1 as this Specific Plan is designed to provide a range of housing types and price points to help meet the existing and anticipated demand for housing within different economic segments of the City.
GOAL H-3: Maintain high quality residential development standards to ensure the establishment of livable neighborhoods with lasting safety and aesthetic value, and to promote the maintenance and preservation of historic neighborhoods.
CONSISTENCY: SP 2025-0001 is consistent with Goal H-3 as this Specific Plan establishes a high-quality residential community by providing residential development standards (Section 4) to ensure the establishment of high quality livable and safe neighborhoods. The Skyline Heights community will be a new community and will not contain any historic buildings or homes.
7.5 HISTORIC RESOURCES
GOAL HR-3: Recognize the importance of archeological and paleontological resources and ensure the identification and protection of those resources within the City of Corona.
CONSISTENCY: SP 2025-0001 is consistent with Goal HR-3 because the certified Environmental Impact Report for the project site and the EIR Addendum addresses the potential impacts to archeological and paleontological resources associated with the proposed development. The Specific Plan will adhere to all applicable restrictions and requirements identified in the EIR and its Addendum to ensure that the potential impacts are mitigated to below a level of significance.
7.6 ECONOMIC DEVELOPMENT
GOAL ED-4: Ensure fiscal viability for the City by pursuing a diversified local business base that provides growing sales and property tax revenues to pay for municipal operations.
CONSISTENCY: SP 2025-0001 is consistent with Goal ED-4 as the fiscal analysis for the Skyline Heights Specific Plan area demonstrates the project does not negatively impact the City’s revenue base. The project will provide additional revenue to the existing Lighting and Landscape Maintenance District in the area, as well as increase and maintain a strong property tax base.
7-4
GOAL ED-5: Pursue a range of financing opportunities to fund infrastructure and other public facilities.
CONSISTENCY: SP 2025-0001 is consistent with Goal ED-5 because the Skyline Heights project developer will pay the fair-share of impact fees and improvements costs, as stipulated in the project’s Development Agreement, to fund the infrastructure improvements and other public facilities necessary to service the planned development.
7.7 CIRCULATION
GOAL CE-1: A roadway network of complete streets that provide accessibility for all users of all ages and abilities while maintaining context sensitivity to the land uses identified in the Land Use Element.
CONSISTENCY: SP 2025-0001 is consistent with Goal CE-1 as this Specific Plan is designed to accommodate a roadway network of public local and collector streets that provides accessibility for pedestrians, vehicles, and emergency personnel. The project’s circulation system will maintain sensitivity to the surrounding land uses through design and speed limitations.
GOAL CE-5: Develop and maintain convenient bikeway and hiking trail systems to satisfy both recreational desires and transportation needs using a complete streets approach to accommodate users of all modes, abilities, and needs.
CONSISTENCY: SP 2025-0001 is consistent with Goal CE-5 as this Specific Plan provides sidewalks, bikeway, and hiking trails system as part of the existing trail network in the surrounding area. The project trails, sidewalks, and bikeways will be accommodated and integrated as part of the project transportation system and the 11.42 acres of recreational uses within the Skyline Heights community.
GOAL CE-7: Provide an adequate supply of convenient parking for all developments in the City in a manner that is consistent with the goals of managing transportation demand.
CONSISTENCY: SP 2025-0001 is consistent with Goal CE-7 as this Specific Plan will provide adequate off-street parking in compliance with the standards contained in this Specific Plan and Chapter 17.76 of the Corona Municipal Code, where applicable.
7.8 INFRASTRUCTURE AND UTILITIES
GOAL IU-1: Secure water supply, water treatment, distribution, pumping, and storage systems that meet the current and projected future daily and peak water demands of Corona in an equitable, efficient, and sustainable manner.
CONSISTENCY: SP 2025-0001 is consistent with Goal IU-1 as the Specific Plan area establishes the necessary water system infrastructure for the City of Corona. The Specific Plan’s water distribution system has been designed to satisfy the water requirements for residential, recreational, landscaping, and fire emergency purposes in an efficient and sustainable manner.
General Plan Consistency Analysis HEIGHTS
7-5
GOAL IU-2: Minimize water consumption and urban runoff generation through site design, the use of water conservation systems, and other techniques.
CONSISTENCY: SP 2025-0001 is consistent with Goal IU-2 as this Specific Plan encourages water conservation practices within Section 5, Community Design Guidelines. To reduce the project’s demand for potable water, reclaimed water will be used to irrigate landscaping in the street parkways, parks, slopes, and open space areas, as available.
GOAL IU-5: Ensure that urban runoff from existing and new development does not degrade the quality of the City’s surface waters, groundwater system, and other sensitive environmental areas.
CONSISTENCY: SP 2025-0001 is consistent with Goal IU-5as the Skyline Heights project is designed to capture and control water runoff and avoid contamination of ground water and other sensitive areas within the project site. All appropriate permits shall be obtained prior to grading activities, and all development within the Specific Plan area shall comply with an approved Water Quality Management Plan (WQMP), which shall be implemented with Best Management Practices (BMPs) including structural BMPs for source control and/or treatment of project-related storm water runoff.
GOAL IU-8: Allow for the provision of an adequate, safe, and orderly supply of telecommunication infrastructure to support existing and future land uses within the City.
CONSISTENCY: SP 2025-0001 is consistent with Goal IU-8 as this Specific Plan because the Specific Plan anticipates and accommodates the adequate and safe development of telecommunication infrastructure to support existing and future land uses within the City.
7.9 PARKS, SCHOOL, AND LIBRARIES
GOAL PR-1: A well-designed system of parks and associated facilities that are sufficient in acreage, type, and distribution, that are designed to provide a quality recreational experience, and that meet the diverse needs of Corona residents.
CONSISTENCY: SP 2025-0001 is consistent with Goal PR-1 as this Specific Plan provides approximately 11.42 acres of new private and public park acreage, consisting of recreational amenities that include active and passive use activities. The new park areas will fulfill the City’s Quimby requirements and designed to meet the diverse needs of existing and future residents.
GOAL PR-2: An engaging mix of passive and active recreational, educational, and cultural programs that are responsive to the diverse needs and interests of Corona’s residents and visitors of all ages and abilities.
CONSISTENCY: SP 2025-0001 is consistent with Goal PR-2 as this Specific Plan will be designed to include a mix of passive and active recreational features, such as an open field park, dog parks, a pump track, bike track, tot lots, kite park, meandering trails, and basketball and pickleball courts. The Skyline Heights park areas will be designed to meet the needs of existing and future residents of all ages and abilities.
7-6
GOAL PR-6: A comprehensive and quality system of off-road hiking, biking, and equestrian trails that are, to the extent feasible, accessible to people of all ages, and connect residents to natural resources surrounding Corona.
CONSISTENCY: SP 2025-0001 is consistent with Goal PR-6 as this Specific Plan identifies the establishment of a comprehensive and quality system of hiking, biking trails accessible to people of ages as part of the project’s park system. The trails and bikeways will connect to the surrounding existing trail system, adjacent to the City’s natural resource landmarks.
7.10 POLICE AND FIRE SERVICES
GOAL PS-5: Ensure that there is an adequate service level of law enforcement provided for all residents, visitors, and businesses throughout the City of Corona.
CONSISTENCY: SP 2025-0001 is consistent with Goal PS-5 as the City of Corona Police Department can adequately serve the Skyline Heights development without reducing the service level. Assessment of the law enforcement needed to adequately serve the Skyline Heights community and potential impact to service levels is represented in the Specific Plan’s certified EIR Addendum.
GOAL PS-8: Ensure that there is an adequate service level of fire protection and suppression services provided for all residents, visitors, and businesses throughout the City of Corona to meet community expectations and budgetary resources for safety.
CONSISTENCY: SP 2025-0001 is consistent with Goal PS-8 as the fire protection and emergency response services necessary to serve the Specific Plan Area will be provided by the City of Corona Fire Department. Assessment of fire protection and emergency response services needed to adequately serve the Skyline Heights community are represented in the certified EIR Addendum for the Specific Plan. Fire Station #6 is anticipated to serve the Specific Plan Area.
GOAL PS-7: Encourage the use of land use and development configuration and site design standards within residential and other developments to minimize crime and improve the safety for residents, visitors, and employees.
CONSISTENCY: SP 2025-0001 is consistent with Goal PS-7 as this Specific Plan provides design guidelines that incorporate increased visibility at parks, open space, pathways, building entries and parking lots; and adequate exterior lighting for security and safety.
GOAL PS-10: Reduce fire risk to life and property through effective land use planning and compliance with federal, state, local laws, ordinances, and standards.
CONSISTENCY: SP 2025-0001 is consistent with Goal PS-10 as this Specific Plan is designed to minimize fire risk through the implementation of a fire protection plan, approved by the City of Corona Fire Department.
General Plan Consistency Analysis HEIGHTS
7-7
7.11 HEALTHY COMMUNITIES
GOAL HC-6: Safe, accessible, convenient, and affordable opportunities that promote and encourage residents to be physically active.
CONSISTENCY: SP 2025-0001 is consistent with Goal HC-6 as this Specific Plan establishes approximately 11.42 acres of combined private and public park space that will offer passive and active use facilities that provide safe, accessible, convenient, and affordable opportunities.
Details:
LIST OF CONDITIONS
DEPARTMENT CONTACT
FIRE Xente Baker
1. The project is located in an area designate as a Very High Fire Hazard Severity Zone. All construction shall demonstrate compliance with all applicable requirements of the 2025 California WUI Code, 2025 California Fire Code, 2025 California Residential Code and the 2025 California Building Code.
PLANNING
1. The project shall comply with all applicable requirements of the Corona Municipal Code (CMC) and ordinances and the relevant Specific Plan, if any, including the payment of all required fees.
2. The applicant or his successor in interest shall comply with the mitigation measures established in the Skyline Heights Environmental Impact Report Addendum No. 1.
3. To the fullest extent permitted by law, the applicant shall defend, indemnify and hold the City of Corona and its directors, officials, officers, employees, volunteers and agents free and harmless from any and all claims, demands, causes of action, proceedings, costs, expenses, liabilities, losses, damages or injuries of any kind, in law or equity, in any manner arising out of, pertaining to, or incident to any attack against or attempt to challenge, set aside, void or annul any approval, decision or other action of the City of Corona, whether such approval, decision or other action was by its City Council, Planning and Housing Commission or other board, director, official, officer, employee, volunteer or agent. To the extent that Government Code Section 66474.9 applies, the City will promptly notify the applicant of any claim, action or proceeding made known to the City to which Government Code Section 66474.9 applies and the City will fully cooperate in the defense. The Applicant's obligations hereunder shall include, without limitation, the payment of any and all damages, consultant and expert fees, and attorney's fees and other related costs and expenses. The City shall have the right to retain such legal counsel as the City deems necessary and appropriate.
4. Nothing herein shall be construed to require City to defend any attack against or attempt to challenge, set aside, void or annul any such City approval, decision or other action. If at any time Applicant chooses not to defend (or continue to defend) any attack against or attempt to challenge, set aside, void or annul any such City approval, decision or other action, the City may choose, in its sole discretion, to defend or not defend any such action. In the event that the City decides not to defend or continue the defense, Applicant shall be obligated to reimburse City for any and all costs, fees, penalties or damages associated with dismissing the action or proceeding. If at any time both the Applicant and the City choose not to defend (or continue to defend) any action noted herein, all subject City approvals, decisions or other actions shall be null and void. The Applicant shall be required to enter into any reimbursement agreement deemed necessary by the City to effectuate the terms of this condition.
Project Number: SP2025-0001
Applied: 2/24/2025 Approved:
Closed: Expired:
Status: RECEIVED
Parent Project: DPR2024-
0010
New "Skyline Heights" Specific Plan, TTM 36544
Site Address: SKYLINE HEIGHTS CORONA, CA 92882
RICHLAND VENTURES, INC
3161 MICHELSON DRIVE 425 IRVINE CA, 92612
Description:
Applicant:
SP2025-0001 1 of 14 (Continued on next page)
Project Conditions
City of Corona
PLANNING
5. Within two weeks of the City Council approval of SP2025-0001 (Skyline Heights Specific Plan), the applicant shall submit a screen check copy of the final, clean Skyline Heights Specific Plan (no redlines) in PDF format to the case planner for review.
The cover sheet and interior cover sheet shall be updated to reflect the City Council approval date and, ordinance number, and case file number. Any references noting the document as "draft" shall be removed. The final enlarged 11" x 17" exhibits and the EIR Addendum Mitigation Monitoring Table shall be attached to the back of the specific plan document as appendices. The Table of Contents shall be updated to accurately reflect the final page numbers for the sections, exhibits and tables. Within 30 days of the screen check review, the applicant shall submit 10 printed copies of the final, clean Skyline Heights Specific Plan with the enlarged 11" x 17" exhibits and the EIR Addendum Mitigation Monitoring Table attached to the back of the specific plan document as appendices and in accordion fold (fold in half once, then fold the right-hand half in half). Each printed copy shall be hole punched and placed within a three-ring binder and delivered to the project planner. One master copy of the final, clean specific plan document in PDF format shall accompany the 10 printed copies.
6. The development standards in Tables 4-1, 4-2 and 4-3 of the final specific plan shall include a minimum living area requirement of 1,000 square feet (exclusive of garages, porches and patios) for the SFD and SFD Cluster land use designations.
7. The Land Use Plan, Exhibit 3-1, in the final specific plan shall be revised as follows:
a) The residential land use shall be revised to: SFD (PA 2) and SFD Cluster (PA 1 and 2). Refer to Exhibit 2 of the staff report for SPA2025-0001.
b) The applicant shall revise Exhibit 3-1 to clearly delineate all planning area boundary lines. Boundary lines shall be graphically enhanced to be darker, bolder, and of sufficient line weight and contrast to be easily distinguishable from other map features.
PUBLIC WORKS Cassidy Jones
1. The Public Works, Planning and Development, and Utilities Department conditions of approval for the subject application shall be completed at no cost (with the exception of the cost sharing agreement per condition of approval 76) to any government agency. All questions regarding the intent of the conditions shall be referred to the Planning and Development Department, Development Services Division. Should a conflict arise between City of Corona standards and design criteria and any other standards and design criteria, City of Corona standards and design criteria shall prevail.
2. The developer shall comply with the State of California Subdivision Map Act and all applicable City ordinances and resolutions.
3. Prior to issuance of grading permit the applicant shall demonstrate to the satisfaction of the City Eningeer that the proposed subdivision will not unreasonably interfere with the use of any easement holder of the property.
4. All improvement and grading plans shall be drawn on twenty-four (24) inch by thirty-six (36) inch Mylar and signed by a registered civil engineer or other registered/licensed professional as required.
5. The submitted site plan shall correctly show all existing easements, traveled ways, and drainage courses. Any omission or misrepresentation of these documents may require said site plan to be resubmitted for further consideration.
6. The applicant shall dedicate easements over the maintenance access road located on Lots H and B to permit access to lot F.
7. All existing and new utilities adjacent to and on-site shall be placed underground in accordance with City of Corona ordinances.
8. Prior to issuance of a Certificate of Occupancy, the developer shall cause the engineer of record to submit project base line work for all layers in AutoCAD DXF format on Compact Disc (CD) to the Planning and Development Department, Development Services Division. If the required files are unavailable, the developer shall pay a scanning fee to cover the cost of scanning the as-built plans.
SP2025-0001 2 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
9. The developer shall monitor, supervise and control all construction and construction related activities to prevent them from causing a public nuisance including, but not limited to, insuring strict adherence to the following:
a) Removal of dirt, debris or other construction material deposited on any public street no later than the end of each working day.
(b) Construction operations, including building related activities and deliveries, shall be restricted to Monday through Saturday from 7:00 a.m. to 8:00 p.m., excluding holidays, and from 10:00 a.m. to 6:00 p.m. on Sundays and holidays, in accordance with City Municipal Code 15.04.060, unless otherwise extended or shortened by the City Engineer or Building Official. (c) The construction site shall accommodate the parking of all motor vehicles used by persons working at or providing deliveries to the site.
Violation of any condition or restriction or prohibition set forth in these conditions shall subject the owner, applicant, developer or contractor(s) to remedies as noted in the City Municipal Code. In addition, the City Engineer or Building Official may suspend all construction related activities for violation of any condition, restriction or prohibition set forth in these conditions until such time as it has been determined that all operations and activities are in conformance with these conditions.
SP2025-0001 3 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
10. Prior to issuance of a building permit, the developer shall finish the construction or post security guaranteeing the construction of all public improvements. Said improvements shall include, but are not limited to, the following:
Prior to building permit issuance in any Planning Area:
a) Traffic signals located at the intersection of Trudy Way and Foothill Parkway and Elysia Street and Foothill Parkway. b) Replacement of VCP sanitary sewer as stipulated in the approved sewer study dated December 2025 on Kroonen Drive and Brentwood Drive.
c) The Zone 5 reinforced concrete tank described in Public Works Condition No. 78 as required for the project per approved final water study dated February 2026.
Prior to Building Permit issuance in Planning Area 1:
a) All street facilities including but not limited to those on Mabey Canyon, P Street, Q Street, R Street, maintenance and fire access roads, and modifications to existing street facilities including on Foothill Parkway impacted by the proposed project improvements.
b) All drainage facilities on Mabey Canyon Road, P Street, Q Street, R Street, maintenance access road, Foothill Parkway, and including existing facilities along Foothill Parkway impacted by the proposed project improvements. c) All required grading, including erosion control.
d) All required sewer, water, and reclaimed water facilities on R Street, Q Street, P Street, and Foothill Parkway. e) All water quality treatment facilities including those in lot HH. f) All required landscaping.
g) All under grounding of overhead utilities, except for cables greater than 32k volts. h) All improvements recommended by the Traffic Impact Analysis Report and modifications to medians and striping on Foothill Parkway as required to accommodate improvement recommendations. i) All required streetlight improvements within PA1.
Prior to building permit issuance in Planning Area 2 or Planning Area 3:
a) All street facilities including but not limited to improvements on Trudy Way, A Street, M Street, E Street, G Street, J Street, I Street, K Street, B Street, F Street, H Street, L Street, N Street, O Street, T Street, maintenance access roads, and modifications to existing street facilities including on Foothill Parkway and Trudy Way impacted by the proposed project improvements. b) All drainage facilities including but not limited to those on A Street, E Street, G Street, J Street, I Street, K Street, B Street, F Street, H Street, L Street, N Street, O Street, T Street, maintenance access roads, and existing facilities along Foothill Parkway and Trudy Way impacted by the proposed project improvements. c) All required grading, including erosion control.
d) All required sewer, water, and reclaimed water facilities. e) All water quality treatment facilities including those located on Trudy Way, M Street, E Street, T Street, lot NN, and lot CC. f) All required landscaping.
g) All required park facilities located on lots K, I, F, all private park facilities located on lots XX, TT, GG, E, U and all trails facilities located on lots M, NN, D, H, G, F, L and Q.
h) All under grounding of overhead utilities, except for cables greater than 32k volts. i) All improvements recommended by the Traffic Impact Analysis Report including modifications to medians and striping as required to accommodate improvement recommendations and modifications to the existing signal at the intersection of B street/Border Avenue and Foothill Parkway.
j) All required bike lane and pedestrian crossing improvements including but not limited to Class II bike lanes on E Street, Class III bike lanes on public streets fronting homes which connect Trudy, B Street, A Street, and M Street to Trudy, and 3 raised pedestrian crosswalk crossings.
k) All required traffic calming measures at each project entrance on E Street and B Street. l) Debris and detention basins located in lots Q, L, J, H, CC, and D. m) All required street light improvements within PA2, PA3, and Trudy Way. n) The full cost of design and construction of a Zone 6A reinforced concreted water tank as required by the project per the approved final water study dated February 2026.
o) The full cost of design and construction of a public reclaimed water booster station. [AMENDED BY THE PLANNING AND HOUSING COMMISSION ON MAY 27, 2026.] SP2025-0001 4 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
11. All the grading design criteria shall be per City of Corona standards, Corona Municipal Code Title 15 Chapter 15.36 and City Council Ordinance Number 2568, unless otherwise approved by the City Engineer.
12. Prior to approval of grading plans, the applicant shall submit two (2) copies of a soils and geologic report prepared by a Registered Engineer to the Planning and Development Department, Development Services Division. The report shall address the soil's stability and geological conditions of the site. If applicable, the report shall also address: deep seated and surficial stability of existing natural slopes; modified natural slopes which are subject to fuel zones; manufactured slopes and stability along proposed daylight lines; minimum required setbacks from structures; locations and length of proposed bench drains, sub-drains or french drains; and any other applicable data necessary to adequately analyze the proposed development. The study shall also address slope stability in the earthquake fault zone and mitigate any potential sliding.
13. Prior to approval of grading plans, the Alquist Priolo fault zone and setback limits as a result of the fault study, shall be shown and clearly labelled on the plans.
14. Prior to approval of grading plans, erosion control plans and notes shall be submitted and approved by the Planning and Development Department, Development Services Division.
15. Prior to approval of the Grading Plans, the developer shall submit a Geologic Fault Investigation for peer review and city approval. The study shall included trenching to investigate any active faults on the site and show the proposed fault setback limits. The applicant shall comply with all mitigation as specified in the fault study to ensure compliance with the Alquist Priolo Special Studies Act. The grading plan shall incorporate any findings and recommended actions resulting from the investigation.
The developer shall be responsible for ensuring the final study is filed with the State. Prior to approval of improvement plans, the fault study shall identify areas with impacts to underground utilities.
16. Prior to approval of grading plans, the applicant shall obtain a General Construction Activity Storm Water Permit from the State Water Resources Control Board in compliance with National Pollutant Discharge Elimination System (NPDES) requirements.
Proof of filing a Notice of Intent (NOI) will be required by the City. The WDID # shall be displayed on the title sheet of the grading plans.
17. Prior to approval of grading plans, the applicant shall comply with the Federal Clean Water Act and shall prepare a Storm Water Pollution Prevention Plan (SWPPP). The SWPPP shall be available at the project site for review.
18. Prior to issuance of grading permit or construction of any improvements, a letter will be required from a qualified botanist, plant taxonomist or field biologist specializing in native plants, stating that an investigation and/or eradication of scale broom weed (Lepidospartum Squamatum) has been completed.
19. Prior to the issuance of a grading permit the developer shall submit recorded slope easements or written letters of permission from adjacent landowners in all areas where grading is proposed to take place outside of the project boundaries.
20. Prior to issuance of building permits, the developer shall cause the civil engineer of record and soils engineer of record for the approved grading plans to submit pad certifications and compaction test reports for the subject lots where building permits are requested.
21. Prior to approval of grading plans, the applicant shall provide maintenance access road for all fuel modification zones to the satisfaction of the Fire Marshall and the City Engineer.
22. Prior to release of grading security, the developer shall cause the civil engineer of record for the approved grading plans to submit a set of as-built grading plans with respect to Water Quality Control facilities.
23. Prior to map recordation of each map or issuance of a grading permit, whichever occurs first, the developer shall obtain a Section 1601/1603 permit from the California Department of Fish and Wildlife, a Section 401/404 permit from the United States Army Corps of Engineers, or provide verification that the project is exempt from permit requirements or as otherwise approved by the City Engineer.
24. Prior to issuance of any grading permit, any environmental Phase I and Phase II findings and recommended actions to remove contamination resulting from previous use of the subject site shall be implemented.
25. All City of Corona NPDES permit requirements for NPDES and Water Quality Management Plans (WQMP) shall be met per Corona Municipal Code Title 13 Chapter 13.27 and City Council Ordinance Numbers 2291 and 2828 unless otherwise approved by the City Engineer. City Maintained WQMP facilities shall be designed and constructed as required by the Public Works Department Street Maintenance Division.
SP2025-0001 5 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
26. Prior to the issuance of a grading permit, a Final WQMP, prepared in substantial conformance with the approved Preliminary WQMP, shall be submitted to the Planning and Development Department, Development Services Division for approval. Prior to issuance of a grading permit, a separate WQMP shall be prepared for any City Maintained WQMP facilities. Upon their final approvals, the applicant shall submit one copy on a CD-ROM in PDF format.
27. Prior to the issuance of the first Certificate of Occupancy, the applicant shall record Covenants, Conditions and Restrictions (CC&R's) or enter into an acceptable maintenance agreement with the City to inform future property owners to implement the approved WQMP.
28. Prior to issuance of the first Certificate of Occupancy, the applicant shall provide proof of notification to the future homeowners and/or occupants of all non-structural BMPs and educational and training requirements for said BMPs as directed in the approved WQMP.
29. Prior to issuance of Certificate of Occupancy, the applicant shall ensure all structural post construction BMPs identified in the approved project specific Final WQMP are constructed and operational.
30. Prior to issuance of a first Certificate of Occupancy, all basins (debris, water quality, detention) shall be constructed and in operation, unless as otherwise approved by the City Engineer.
31. All the drainage design criteria shall be per City of Corona standards and the Riverside County Flood Control and Water Conservation District standards unless otherwise approved by the City Engineer.
32. Prior to approval of any improvement plans, the applicant shall submit a detailed hydrology study. Said study shall include the existing, interim and the ultimate proposed hydrologic conditions including key elevations, drainage patterns and proposed locations and sizes of all existing and proposed drainage devices. The hydrology study shall present a full breakdown of all the runoff generated on- and off-site. The study shall review the Q10 for capacity within the streets and Q100 for capacity within the right-of-way. If the study reflects that either of the two parameters are exceeded, appropriate storm drain facilities shall be extended across the project frontage to provide proper protection. The study shall analyze all basin facilities and shall ensure they are properly sized for the upstream tributary area and that the downstream facilities can adequately accept any proposed increase. The detention basin located in lot CC (southeast corner of Foothill Parkway and Border Ave) shall be sized to accommodate all increased runoff from the project unless otherwise supported by the study and approved by the City Engineer.
33. Prior to approval of improvement plans, the improvement plans submitted by the applicant shall address the following:
1) The project drainage design shall be designed to accept and properly convey all on- and off-site drainage flowing on or through the site.
2) The project drainage system design shall protect downstream properties from any damage caused by alteration of drainage patterns such as concentration or diversion of flow.
3) All residential lots shall drain toward the street. Lot drainage to the street shall be by side yard swales independent of adjacent lots or by an underground piping system.
4) Once the project drainage has been treated it may continue into an approved public drainage facility.
34. Street design criteria and cross sections shall be per City of Corona standards, approved Specific Plan design guidelines and the State of California Department of Transportation Highway Design Manual unless otherwise approved by the City Engineer.
35. Prior to approval of improvement plans the applicant shall grant any additional right-of-way along Foothill Parkway necessary for construction of a right-turn lane onto proposed B Street. Prior to approval of improvement plans the applicant shall grant any additional right-of-way along Foothill Parkway necessary for construction of a right-turn lane onto P Street. All conveyances shall be shown on the plans as lettered lots and conveyances of Foothill Parkway shall be made in fee unless otherwise approved by the City Engineer. The applicant shall convey any portions of Foothill Parkway owned by the applicant to the City in fee. All conveyances shall continue in force until the City accepts or abandons such offers. All conveyances shall be free of all encumbrances and approved by the City Engineer.
36. Prior to building permit issuance or as otherwise determined by the City Engineer the applicant shall reserve for private streets with public utility easements and emergency access P Street, Q Street, and R Street. The application shall also ensure sufficient access rights exist on P Street and R Street to provide access for the properties that take access at the corner of P Street and R Street from Foothill Parkway.
SP2025-0001 6 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
37. Prior to building permit issuance in Planning Area 2 or Planning Area 3 or as otherwise determined by the City Engineer the applicant shall grant to the City all required street rights-of-way including: A Street, G Street, I Street, portion of J Street, K Street, M Street, E Street, (64-feet wide local street except where modified), B Street (68 feet wide/ collector street); and F Street, H Street, portion of J Street, L Street, N Street, O Street, T Street, and the B Street cul-de-sac (56-feet wide cul-de-sac street) and portion of E street (52-feet wide modified local street). Said dedications shall continue in force until the City accepts or abandons such offers. All dedications shall be free of all encumbrances and approved by the City Engineer.
38. Prior to recordation of T36544 (PA2 and PA3) the applicant shall offer for dedication in fee to the City lots P, Q, L, K, J, M, I, H, D, AAA, T, EE, and F for open space. Applicant may offer additional open space lots for dedicated in fee to the City or may grant such lots to the city by separate grant deed. The City may accept or reject the offer at the City's sole discretion. The applicant shall ensure that the city has access rights to these open space lots via a document that is acceptable to the city attorney. Said dedication shall continue in force until the City accepts or abandons such offers. All dedications shall be free of all encumbrances and approved by the City Engineer. Dedications to be conveyed at such time that all improvements are completed, including but not limited to, all streets that are required to access said lots, all park improvements, and all public utilities that service said lots. Notwithstanding the required dedication(s), the Applicant shall retain the right to and remain obligated to construct, install, and maintain all improvements within the areas offered for dedication, as required or permitted by the Tentative Map and these Conditions of Approval, until all required project improvements have been completed and formally accepted for maintenance by the City.
The requirement that dedications be provided free of encumbrances shall be limited to monetary liens and shall not preclude easements or other rights necessary for fuel modification, drainage, access, or maintenance, as approved by the City Engineer.
The Applicant shall coordinate with the City to identify and dedicate additional open space, where appropriate, for the benefit of the public, subject to mutual agreement.
SP2025-0001 7 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
39. Prior to approval of improvement plans, the improvement plans submitted by the applicant shall include the following:
For any planning area:
a) All driveways shall conform to the applicable City of Corona standards and shall be shown on the street improvement plans. b) The traffic signals located at Foothill and Trudy, Foothill and Elysia, traffic signal and intersection modification at the intersection of Foothill Parkway and Border, and the striping modification located at the intersection of proposed P Street and Foothill shall be improved as required by the City Traffic Engineer. c) All street intersections shall be at ninety (90) degrees or as approved by the City Engineer. d) All reverse curves shall have a minimum tangent of fifty (50) feet in length. e) Under grounding of existing and proposed utility lines. f) All improvements as required by the approved Traffic Impact Analysis Report and modifications to medians and striping as required to accommodate improvement recommendations.
g) All other public improvements shall conform to City of Corona standards. h) Water quality and debris basins shall be per the Riverside County Flood Control and Basin Guideline requirements.
For Planning Area 1:
a) Street lights on P Street, Q Street, R Street, and any streetlight modifications required on Foothill Parkway.
For Planning Area 2 and Planning Area 3:
a) All driveways shall conform to the applicable City of Corona standards and shall be shown on the street improvement plans.
Including the driveway for lot G which shall take access off of B Street unless otherwise approved by the City Engineer. b) All reverse curves shall have a minimum tangent of fifty (50) feet in length including curves on A Street and E Street. c) Street lights located on A Street, M Street, E Street, G Street, J Street, I Street, K Street, B Street, F Street, H Street, L Street, N Street, O Street, T Street, and modifications to streetlights on Foothill Parkway and Trudy Way as need for the construction of the development.
d) All required parks including those on lots K, I, and F, all private parks located on lots XX, TT, GG, E, U and all trail facilities located in lots "M" "NN" "D" "H" "G" and "F"
e) All required bike lane and pedestrian improvements including but not limited to: Class II bike lanes on E Street, Class III bike lanes on public streets fronting homes which connect Trudy, B Street, A Street, and M Street to Trudy, and 3 raised pedestrian crosswalk crossings.
f) Traffic calming measures located at on M Street, E Street and B Street. g) Water quality and debris basins located on Trudy Way, E Street, M Street, T Street, lot NN, lot CC, lot L, lot Q, lot J, lot H, and lot D.
[AMENDED BY THE PLANNING AND HOUSING COMMISSION ON MAY 27, 2026.]
40. Prior to any building permit issuance, all street names shall be approved by the City Engineer.
41. The developer shall pave all streets and access roads having more than a 10 percent vertical grade with concrete subject to the approval by the Fire Department and City Engineer.
42. Prior to the first certificate of occupancy in Planning Area 1 the developer shall work with the United States Postal Service to relocate mailboxes for those lots which take access from Mabey Canyon Road.
43. Prior to the first certificate of occupancy in Planning Area 1 the developer shall construct an automated gate with Knox box entry at the paved access road connecting the knuckle shared by P Street, R Street, and Mabey Canyon Road for the purpose of providing access to those lots that currently take access from Mabey Canyon Road, to provide emergency access, utility, and HOA maintenance access. The gate shall be maintained by the Homeowner's Association and maintenance shall be stipulated in the CC&R's.
44. Prior to the first certificate of occupancy in Planning Area 1 the developer shall construct an automated gate with knox box entry and turn around at the intersection of Mabey Canyon Road (emergency access) and Foothill Parkway. The Homes Owner's association shall enter into a license agreement with the City for the maintenance of the Mabey Canyon Entrance Gate.
SP2025-0001 8 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
45. Prior to approval of improvement plans for any planning area, the improvement plans shall show all the existing streets, including Foothill Parkway, to be improved to half width plus ten (10) additional feet (or to the median) unless otherwise approved by the City Engineer. Intersections on Foothill Parkway shall be improved in full, unless otherwise approved by the City Engineer. Prior to the approval of improvement plans for Planning Area 1 Trudy Way shall, at a minimum, be grind and overlayed (2 inches), from curb to curb, from the M Street to Foothill Parkway, or unless otherwise approved by the City Engineer. At the discretion of the applicant, the existing pavement may be cored to confirm adequate section and R values during the design process and any findings shall be incorporated into the project design. Therefore, improvements may include full pavement reconstruction, grind and overlay, or slurry seal. All striping shall be replaced in kind.
46. Prior to release of public improvement security, the developer shall cause the civil engineer of record for the approved improvement plans to submit a set of as-built plans for review and approval by the Planning and Development Department, Development Services Division.
47. Prior to acceptance of improvements, the City Engineer may determine that aggregate slurry, as defined in the Standard Specifications for Public Works Construction, may be required one year after acceptance of street(s) by the City if the condition of the street(s) warrant its application. All striping shall be replaced in kind. The applicant is the sole responsible party for the maintenance of all the improvements until said acceptance takes place.
48. Prior to building permit issuance the applicant shall form a new Community Facilities District (if approved by the City), or otherwise shall annex the full project boundary into a City of Corona Maintenance Community Facilities District 2016-3 for the purpose of maintaining public services including but not limited to public streets, curb & gutter, street lights, storm drain, sidewalk, trails, traffic signals, parks, pavement, and public landscaping within master planned street right-of-way and/or CFD easements. All assessable parcels therein shall be subject to annual CFD/LMD charges (special taxes and assessments) for operations and capital improvements. The developer shall be responsible for all costs incurred during annexation in the CFD.
49. Prior to building permit issuance, the applicant shall annex the full project boundary into the City of Corona Public Services Community Facilities District (CFD) 2016-1 for the purpose of funding public services including but not limited to police and fire emergency services. All assessable parcels therein shall be subject to annual CFD charges (special taxes or assessments) for operations and capital improvements. The developer shall be responsible for all costs incurred during annexation into the CFD.
50. Prior to approval of grading plans, fuel modification zones shall be shown and clearly labelled.
SP2025-0001 9 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
51. Prior to the issuance of the 221st building permit, the applicant shall construct, install or provide the following public improvement or facilities: (a) park facilities located in lots K, I, and F, which shall include play structure, pickleball courts, basketball courts, picnic shelters, fitness equipment, bike pump track, bench seating areas, bike racks, restroom, and drinking fountains, and (b) Skyline trailhead and parking facilities located in Lot I (public park); (Public Facilities) provided that a Community Facilities District is formed to finance the acquisition and/or construction of the Public Facilities ("Public Facilities CFD") that conforms to the following parameters:
- The total effective tax rate shall be the maximum rate allowed by the City’s Debt Policy at the time the CFD is formed and includes all ad valorem fixed charges the special taxes imposed by the Community Facilities District 2016-3, Community Facilities District 2016-1, and the proposed Public Facilities CFD; - If, at bond issuance, the total effective tax rate exceeds the Debt Policy requirements, the proposed special taxes would be reduced to the maximum tax rate available after calculation of the special taxes imposed by Community Facilities District 2016- 3 and Community Facilities District 2016-1;
- The proposed Public Facilities CFD (construction and/ or DIF) special taxes would be flat and not subject to annual escalation; - The City CFDs (public services and maintenance services) shall hold priority in the effective tax rate calculation and are subject to annual escalation; and
- Community Facilities District 2016-3 and Community Facilities District 2016-1 shall hold priority in the effective tax rate calculation and are subject to annual escalation; and
- Subject to the requirements of federal tax laws and the total effective tax rate limitation, the proposed Public Facilities CFD would also be authorized to finance the acquisition and/or construction of the following City Facilities, which may include facilities specified in the City's development impact fee program and the approved Development Agreement: City park/trailhead improvements, tank sites located on lot M and lot P, and storm drain, sewer, water, and traffic signal improvements.
If the Public Facilities CFD is not formed, the applicant shall not be required to construct, install or provide the Public Facilities.
Notwithstanding the foregoing, however, the applicant shall remain responsible for constructing, installing or contributing to the Project's fair share of any public improvements or facilities that are otherwise required by the City's development impact fee program, the Skyline Heights Development Agreement or any other statute, ordinance, rule, regulation, or standard that applies to the Project.
[AMENDED BY THE PLANNING AND HOUSING COMMISSION ON MAY 27, 2026.]
52. In the event that the Public Facilities CFD is not approved, prior building issuance in Planning Area 2 or Planning Area 3 or as determined by the City Engineer, the developer shall:
a) Grant at no cost to the City lots I, K, and F to the City for the for the construction of a future park by the City.
Notwithstanding the foregoing, the Applicant shall retain all rights to any applicable Quimby credits associated with the dedication, subject to any City requirements or limitations.
Prior to the 147th building permit in Planning Area 2 or Planning Area 3:
a) Construct private parks located in lots E, U, GG, TT, and XX to be maintained by the Home Owners Association.
53. Prior to issuance of a building permit or certificate of occupancy, the applicant shall pay all development fees, including but not limited to Development Impact Fees (DIF) per City Municipal Code 16.23 and Transportation Uniform Mitigation Fees (TUMF) per City Municipal Code 16.21. Said fees shall be collected at the rate in effect at the time of fee collection as specified by the current City Council fee resolutions and ordinances.
54. Prior to issuance of a Certificate of Occupancy, all proposed parkway, slope maintenance, and/or median landscaping specified in the Specific Plan or in these Conditions of Approval shall be constructed.
55. Prior to the issuance of a Certificate of Occupancy, any damage to existing landscape easement areas due to project construction shall be repaired or replaced by the developer, or developer's successors in interest, at no cost to the City of Corona.
56. All the potable water, reclaimed water, and sewer improvements shall be designed per City of Corona Utilities Department standards and Riverside County Department of Health Services Standards unless otherwise approved by the City Engineer and Utilities Director. Special fittings shall be required by the Utilities Department for construction of water, sewer, and reclaimed water within fault setback areas.
SP2025-0001 10 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
57. Prior to issuance of any building permits, including model home permits, a domestic water and fire flow system shall be approved by the Utilities Department and constructed by the developer, to the satisfaction of the Utilities Director and Fire Chief.
58. Prior to approval of building plans, the developer shall construct or guarantee the replacement of the following offsite deficient gravity sewer mains:
a) Replacement of the existing 8-inch gravity VCP sanitary sewer main on Brentwood Drive with a 12 inch VCP sanitary sewer main from manhole MH2039 to manhole MH2041.
b) Replacement of the existing 8-inch VCP sanitary sewer main on Kroonen Drive with a 12 inch VCP sewer main from manhole MH2035 to manhole MH2034.
c) Replacement of the existing 8-inch VCP sanitary sewer main on Kroonen Drive with a 12-inch VCP sewer main from manhole MH2034 to manhole MH2033.
The construction of offsite sewer improvements shall be completed prior to the issuance of any building permit, or unless otherwise approved by the Utilities Director.
59. Prior to issuance of the first Certificate of Occupancy, all weather access road(s) shall be provided to all sewer manholes not located within public right-of-way.
60. Prior to improvement plans approval, the applicant shall ensure that all water meters, fire hydrants or other water appurtenances shall not be located within a drive aisle or path of travel.
61. Prior to issuance of any building permits, the developer shall pay all water and sewer fees, including but not limited to connection fees, wastewater treatment fees, sewer capacity fees and all other appropriate water and sewer fees.
62. Prior to approval of an improvement plan the developer shall incorporate improvement requirements as stipulated in the approved water study dated February 2026 and the approved sewer study dated December 2025 including but not limited to upsizing downstream sewer lines, installing pressure regulators, booster pumps, special material for pipeline construction, backwater valves, tanks, and construction of other appurtenances as necessary to serve the proposed development.
63. Prior to building permit issuance, the applicant shall construct or guarantee the construction of all required public improvements including but not limited to, potable water lines, sewer lines, reclaimed water lines, potable water services, sewer laterals, reclaimed water services, double detector check assemblies and reduced pressure principle assemblies within the public right of way and-or easements.
64. Prior to first building permit issuance, the developer shall construct potable water improvements as recommended by the final water study dated February 2026. The construction of water improvements shall be completed prior to the 1st building permit issuance of each map unless otherwise approved by the Utilities Director.
Prior to first building permit issuance in Planning Area 1:
a) 8-inch Zone 5 ductile iron domestic looped water mains on P Streets, Q Street, R Street, the connections at the intersection of Foothill Parkway and P Street and Mabey Canyon Road and Foothill Parkway.
Prior to first building permit issuance of Planning Area 2 or Planning Area 3:
a) 16-inch Zone 5 ductile iron domestic water mains on B Street , A Street, the connection to Zone 5 tank located on lot M, and the connection at the intersection of Border Avenue and Foothill Parkway. b) 8-inch Zone 6A ductile iron domestic water mains on O Street, B Street, N Street, H Street, F Street, G Street, L Street, I Street, E Street, T Street, and the connection in Trudy Way. Additionally, 8-inch zone 6A ductile iron domestic water mains shall be looped on O Street, I Street, B Street, A Street, J Street, L Street, and T Street. c) 12-inch Zone 6A ductile iron domestic water mains on B Street, K Street, and I Street.
SP2025-0001 11 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
65. Prior to building permit issuance, the developer shall construct or guarantee the construction of all gravity sewer mains as required to serve the development per the approved sewer study. The construction of gravity sewer mains shall be completed prior to the 1st building permit issuance of each map unless otherwise approved by the Utilities Director.
Prior to building permit issuance in Planning Area 1 or as determined by the City Engineer:
a) 8-inch VCP gravity sewer main on P Street, Q Street, R Street, foothill parkway, and the connection on Mabey Canyon Road.
Prior to building permit issuance in Planning Area 2 or Planning Area 3 or as determined by the City Engineer:
a) 8-inch VCP gravity sewer main on A Street, E Street, G Street, J Street, I Street, K Street, B Street, F Street, H Street, E Street, L Street, N Street, O Street, T Street, the connection on Trudy Way, and the connection at the intersection of Border Avenue and Condor Circle.
66. Prior to first building permit issuance, the developer shall construction all reclaimed water improvements as recommended by the final water study dated February 2026. The construction of reclaimed water improvements shall be completed prior to the 1st building permit issuance of each map unless otherwise approved by the Utilities Director.
Prior to first building permit issuance in Planning Area 1:
a) 8-inch Zone 3 ductile iron reclaimed water main on P Street, R Street, and the connection located at the intersection of Street P and Foothill Parkway.
Prior to first building permit issuance in Planning Area 1 or Planning Area 2:
a) 12-inch Zone 3 ductile iron reclaimed water main on B Street and the connection at the intersection of Border Avenue and Foothill Parkway.
b) 12-inch Zone 1380-ft ductile iron reclaimed water main on B Street, A Street, and the connection to the Zone 1380-ft booster pump station off B Street.
c) 8-inch Zone 1380-ft ductile iron reclaimed water
67. Prior to commencement of construction of all water, sewer, and reclaimed water facilities located in Planning Area 3 all the sewer, and reclaimed water facilities located in Planning Area 2 necessary to serve Planning Area 3 shall be operable unless otherwise approved by the City Engineer or Utilities Director.
68. Prior to the first certificate of occupancy in any phase the developer shall construction a heli-hydrant. The location, design, and construction of the Heli-Hydrant shall be determined in coordination with a qualified licensed helicopter pilot using the most demanding aircraft expected to land on the site and shall be subject to the review and approval of the Fire Chief and the City Engineer. The developer shall ensure the Heli-Hydrant location is a minimum setback of 200 feet from the edge of the Final Approach and Takeoff Area (FATO) to adjacent residential property lines, or as approved by the Fire Chief, to prevent damage to structures and backyard items. The developer shall also provide an acoustical analysis prepared by a qualified Acoustical Engineer and shall implement the Acoustical Engineer's recommendations into the location and construction of the helihydrant to reduce impact on adjacent residential uses. The disclosure notice as required by condition 61 shall specify all impacted lots to notify the future homeowners as determined by the qualified Acoustical Engineer and the qualified helicopter pilot. The disclosure notice shall state that the impacted property owners are subject to periodic high-decibel noise and rotor wash from emergency aircraft.
69. The applicant shall grant easements for all public water, reclaimed water, and sewer facilities needed to serve the project in accordance with the requirements of the City of Corona Utilities Department. The minimum easement width shall be 20 feet for one utility and 30 feet for more than one public utility facility. The application shall provide a minimum 20 foot wide paved access road to all public water and sewer facilities unless otherwise approved by the Utilities Director. Structures and trees shall not be constructed or installed within a public utility easement.
70. Prior to building permit issuance, the developer shall construct all necessary water improvements to provide the required fire flow to the development unless otherwise approved by the Utilities Director or the Fire Chief.
71. Fire Hydrants shall be a maximum 250 feet apart or as directed by the Fire Department.
72. Manhole rim elevations shall be lower than all pad elevations immediately downstream. Otherwise a back flow prevention valve will be required.
73. Static pressures exceeding 80 psi require an individual pressure regulator.
SP2025-0001 12 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
74. Reclaimed water shall be used for any construction activity, unless otherwise approved by the Utilities Director or their designee. Prior to obtaining a reclaimed construction meter from the City, a Reclaimed Water Application shall be submitted for the contractor to receive certification to handle reclaimed water.
75. Prior to the first building permit issuance in Planning Area 2 or Planning Area 3, the public 0.6 MG Zone 1560-ft Potable Water Tank and booster pump station shall be operable unless otherwise approved by the Utilities Director and Fire Chief.
76. Prior to issuance of the first building permit, the developer shall enter into an agreement with the City that establishes the reimbursement process for the City's fair-share obligation toward a 2.5-million-gallon Zone 5 (1380-ft) prestressed concrete potable water storage tank. The developer shall be responsible for a minimum 35.9 percent (based on current design conditions) of the total cost of the tank, and the City shall be responsible only for the balance (i.e., 64.1 percent).The final fair share and the water connection fee credit to be provided to the applicant shall be set forth in aforementioned agreement. If the CFD in Condition 52 is approved, the developer shall provide Lot M to the City at no cost, in which case, the property acquisition of Lot M will not be included in the total cost of the tank for determining fair share. The agreement shall specify that the City will reimburse the developer only for the City's share of actual construction costs, subject to City review and approval.
The developer shall also be fully responsible for all design costs and shall submit the completed design to the City for review and approval prior to construction.
77. The applicant shall provide a separate irrigation water service for all HOA- CFD landscaped lots or easements.
78. The landscape plans of all parkway and Landscape Maintenance District (LMD) and Community Facilities District (CFD) lots shall be prepared by a licensed Landscape Architect and shall be submitted to the City for review and approval.
79. The developer shall install automatic irrigation to all street trees separated from adjacent residences by a fence or wall prior to the issuance of a Certificate of Occupancy.
80. Prior to issuance of the 221st building permit, the developer shall update the City's Trails Master Plan and those park, trail, or bike trail maps and exhibits reflecting the changes resulting from the final construction of this project.
81. Prior to the first Certificate of Occupancy in Planning Area 1 the developer shall comply with the following recommendations from the approved traffic study written by Urban Crossroads dated January 23, 2025:
a) Construction of a controlled stop on the northbound approach and a right turn lane at the intersection of P Street and Foothill Parkway.
Prior to the first Certificate of Occupancy in Planning Area 2 or Planning Area 3 the developer shall comply with following recommendations from the approved traffic study:
a) Construction of a northbound left turn lane with a minimum of 100 feet of storage and a shared right turn lane at the intersection of B Street/Border Ave and Foothill Parkway. b) Modification of the westbound left turn lane with a minimum of 100 feet of storage at the intersection of B Street/ Border Avenue and Foothill Parkway.
c) Modification of the traffic signal and striping as necessary to accommodate required changes at the intersection of B Street/Border Avenue and Foothill Parkway.
Prior to the issuance of the first building permit the developer shall comply with the following recommendations from the approved traffic study:
a) Construction of a traffic signal at Trudy Way and Foothill Parkway. b) Construction of a traffic signal at Eylsia Street and Foothill Parkway.
SP2025-0001 13 of 14 (Continued on next page)
Project Conditions
City of Corona
PUBLIC WORKS Cassidy Jones
82. Prior to the first certificate of occupancy for T36544 (PA2 and PA3) the developer shall construct a choker, or a narrowing of the roadway, on E Street within the first 100 feet of the existing cul-de-sac on Trudy Way, to assist in traffic calming or as otherwise approved by the City Traffic Engineer. The developer shall also construct a bulb-out, or extension of sidewalk into the parking lane, on B Street within the first 100 feet from the intersection street B and Foothill Parkway, to assist in traffic calming or as otherwise approved by the City Traffic Engineer.
14 of 14
Project Conditions
City of Corona
Addendum No. 1 to the Environmental
Impact Report
For the Skyline Heights Project Environmental Impact Report (State Clearinghouse No. 2014021003)
Addendum No. 1
Prepared for:
City of Corona
400 S. Vicentia Avenue
Corona, California 92882
Prepared by:
T&B Planning, Inc.
3200 El Camino Real, Suite 100
Irvine, CA 92602
December 11, 2025
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Page i
TABLE OF CONTENTS
Section Number/Title Page
1.0 Introduction...................................................................................................................................... 1-1
1.1 Background...................................................................................................................................... 1-1
1.2 Location and Surrounding Land Uses .............................................................................................. 1-7
1.3 Proposed Project Modifications ...................................................................................................... 1-7
1.3.1 Skyline Heights Specific Plan (SHSP) ................................................................................. 1-7
1.3.2 Revision No. 1 to Tentative Tract Map No. 36544 (TTM 36544R1)................................. 1-12
1.4 Prior Environmental Documentation............................................................................................. 1-14
1.5 Basis for an Addendum.................................................................................................................. 1-15
1.6 Mitigation Measures...................................................................................................................... 1-17
1.7 Summary of Findings..................................................................................................................... 1-46
1.8 Cumulatively-Considerable Impacts.............................................................................................. 1-47
2.0 Environmental Checklist.................................................................................................................... 2-1
2.1 Aesthetics ........................................................................................................................................ 2-2
2.2 Agriculture/Forestry Resources....................................................................................................... 2-6
2.3 Air Quality ........................................................................................................................................ 2-9
2.4 Biological Resources ...................................................................................................................... 2-30
2.5 Cultural Resources......................................................................................................................... 2-76
2.6 Energy ............................................................................................................................................ 2-93
2.7 Geology and Soils........................................................................................................................... 2-98
2.8 Greenhouse Gas Emissions.......................................................................................................... 2-121
2.9 Hazards and Hazardous Materials ............................................................................................... 2-130
2.10 Hydrology and Water Quality ...................................................................................................... 2-142
2.11 Land Use and Planning................................................................................................................. 2-154
2.12 Mineral Resources ....................................................................................................................... 2-180
2.13 Noise............................................................................................................................................ 2-181
2.14 Population and Housing............................................................................................................... 2-206
2.15 Public Services and Recreation.................................................................................................... 2-208
2.16 Transportation ............................................................................................................................. 2-226
2.17 Tribal Cultural Resources ............................................................................................................. 2-236
2.18 Utilities and Service Systems....................................................................................................... 2-237
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Page ii
2.19 Wildfire ........................................................................................................................................ 2-251
2.20 Mandatory Findings of Significance............................................................................................. 2-258
3.0 References........................................................................................................................................ 3-1
4.0 Mitigation Monitoring and Reporting Program (MMRP).................................................................... 4-1
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Page iii
LIST OF FIGURES
Figure Number/Title Page
Figure 1 Regional and Vicinity Map .................................................................................................................. 1-2 Figure 2 General Plan Amendment No. 13-003................................................................................................ 1-3 Figure 3 Change of Zone No. 13-002 ................................................................................................................ 1-4 Figure 4 Tentative Tract Map No. 36544........................................................................................................... 1-5 Figure 5 Annexation No. 117 ............................................................................................................................ 1-6 Figure 6 Skyline Heights Specific Plan Land Use Plan ....................................................................................... 1-9 Figure 7 Revision No. 1 to Tentative Tract Map No. 36544............................................................................. 1-13 Figure 8 Sensitive Receptor Locations ............................................................................................................ 2-22 Figure 9 Overview of Vegetation Community Impacts................................................................................... 2-42 Figure 10 Noise Measurement Locations ....................................................................................................... 2-184 Figure 11 Sensitive Receiver Locations........................................................................................................... 2-185 Figure 12 Construction Blasting Locations in Relation to Sensitive Receptors............................................... 2-190 Figure 13 Conceptual Fuel Modification Plan................................................................................................. 2-254
SKYLINE HEIGHTS
Environmental Impact Report Addendum
LIST OF TABLES
Table Number/Title Page
Page iv
Table 1 Skyline Heights Specific Plan Land Use Allocation Summary.............................................................. 1-8 Table 2 Revision No. 1 to TTM 36544 Statistical Summary ........................................................................... 1-14 Table 3 Maximum Daily Regional Emissions Thresholds............................................................................... 2-13 Table 4 Construction Duration....................................................................................................................... 2-14 Table 5 Construction Equipment................................................................................................................... 2-15 Table 6 Proposed Project Regional Construction Emissions Summary ......................................................... 2-16 Table 7 Original Project Construction Emissions Summary........................................................................... 2-16 Table 8 Comparison of Regional Construction Emissions – Approved Project vs. Proposed Project............ 2-16 Table 9 Proposed Project Regional Operational Emissions Summary........................................................... 2-17 Table 10 SHP EIR Regional Operational Emissions Summary .......................................................................... 2-18 Table 11 Updated Approved Project Regional Operational Emissions............................................................ 2-19 Table 12 Regional Emissions Comparison – SHP EIR vs. Proposed Project ..................................................... 2-19 Table 13 Updated Emissions Comparison – Approved Project vs. Proposed Project...................................... 2-20 Table 14 Project Localized Construction Emissions......................................................................................... 2-23 Table 15 SHP EIR Construction-Related Localized Emissions Summary .......................................................... 2-24 Table 16 Construction-Related Localized Emissions Comparison – SHP EIR vs. Proposed Project ................. 2-24 Table 17 Project Consistency with General Plan Policies Related to Air Quality............................................. 2-27 Table 18 Project Impacts to Vegetation Communities .................................................................................... 2-43 Table 19 Summary of Project Impacts to Jurisdictional Drainages/Wetlands................................................. 2-48 Table 20 Project Consistency with General Plan Policies Related to Biological Resources............................. 2-52 Table 21 Project Site Paleontological Sensitivity ............................................................................................. 2-80 Table 22 Project Consistency with General Plan Policies Related to Cultural Resources................................ 2-82 Table 23 Project Consistency with General Plan Policies Related to Seismic and Geologic Hazards............ 2-107 Table 24 Approved Project Updated GHG Emissions.................................................................................... 2-125 Table 25 Total Project GHG Emissions........................................................................................................... 2-126 Table 26 Project GHG Emissions Compared to SHP EIR GHG Emissions ....................................................... 2-126 Table 27 Project Consistency with General Plan Policies Related to Greenhouse Gas Emissions................. 2-128 Table 28 Project Consistency with General Plan Policies Related to Hazards and Hazardous Materials...... 2-135 Table 29 Peak Flow Comparison.................................................................................................................... 2-148 Table 30 Project Consistency with General Plan Policies Related to Hydrology and Water Quality ............. 2-150 Table 31 Project Consistency with Connect SoCal......................................................................................... 2-156 Table 32 Project Consistency with General Plan Policies Related to Land Use and Planning ....................... 2-165 Table 33 24-Hour Ambient Noise Level Measurements................................................................................ 2-186 Table 34 Significance Criteria Summary ........................................................................................................ 2-187 Table 35 Typical Construction Equipment Noise Level Summary.................................................................. 2-188 Table 36 Typical Construction Noise Level Compliance................................................................................. 2-189 Table 37 Blasting-Related Construction Noise Levels.................................................................................... 2-192 Table 38 Reference Noise Level Measurements............................................................................................ 2-193 Table 39 Daytime Project Operational Noise Levels...................................................................................... 2-193 Table 40 Nighttime Project Operational Noise Levels................................................................................... 2-193
SKYLINE HEIGHTS
Environmental Impact Report Addendum
LIST OF TABLES
Table Number/Title Page
Page v
Table 41 Operational Noise Level Compliance .............................................................................................. 2-194 Table 42 Daytime Project Operational Noise Level Increases....................................................................... 2-195 Table 43 Nighttime Project Operational Noise Level Increases..................................................................... 2-195 Table 44 Existing with Project Traffic Noise Level Increases.......................................................................... 2-196 Table 45 Opening Year with Project Traffic Noise Increases.......................................................................... 2-196 Table 46 Vibration Source Levels for Construction Equipment..................................................................... 2-198 Table 47 Typical Construction Equipment Vibration Levels........................................................................... 2-198 Table 48 Project Consistency with General Plan Policies Related to Noise................................................... 2-201 Table 49 Project Emergency Response Analysis using Speed Limit Formula ................................................ 2-211 Table 50 Project Emergency Response Analysis using ISO Formula.............................................................. 2-211 Table 51 Project Consistency with General Plan Policies Related to Public Services and Recreation........... 2-217 Table 52 Trip Generation Comparison........................................................................................................... 2-228 Table 53 Project Consistency with General Plan Policies Related to Transportation .................................... 2-230 Table 54 Project Consistency with General Plan Policies Related to Utilities and Service Systems.............. 2-243
SKYLINE HEIGHTS
Environmental Impact Report Addendum
1.0 INTRODUCTION
1.1 Background
On February 1, 2017, the City of Corona City Council certified the Final Environmental Impact Report (EIR) for the Skyline Heights project (herein, “SHP”). The EIR prepared for the SHP (herein, “SHP EIR”) evaluated the environmental effects associated with implementation of the SHP, which at the time was located within the western portion of the City of Corona Sphere of Influence (SOI). The location of the SHP site is depicted on Figure 1, Regional and Vicinity Map. The SHP included applications for General Plan Amendment No. 13-003 (GPA13- 003), Change of Zone No. 13-002 (CZ13-002), and Tentative Tract Map No. 36544 (TTM 36544). The SHP also included an application (Annexation No. 117) to prezone the approximately 394.8-acre property within the City of Corona’s Sphere of Influence (SOI) to facilitate annexation of this area into the jurisdictional limits of the City of Corona. As required by the Riverside Local Area Formation Commission (LAFCO), Annexation No. 117 also required City approval of a Plan of Service (PoS) as required by the Riverside Local Area Formation Commission (LAFCO).
Following certification of the SHP EIR, the City Council approved GPA13-003, CZ13-002, and TTM 36544 and approved the PoS for Annexation 117 on February 1, 2017, while Annexation 117 ultimately was approved by LAFCO on December 7, 2017 as part of LAFCO Application No. 2017-06-2.
As shown on Figure 2, General Plan Amendment No. 13-003, GPA13-003 was a proposal to change the City of Corona General Plan Sphere of Influence Land Use Plan (West Sphere) to amend 394.8 acres from “Rural Residential 1 (0.2 – 0.5 dwelling units/acre)” to “Low Density Residential (3-6 dwelling units/acre)” on 357.14 acres and “Open Space” on 37.61 acres. As shown on Figure 3, Change of Zone No. 13-002, CZ13-002 was a proposal to prezone 37.61 acres to Open Space, 86.23 acres to Agriculture, and 270.9 acres to R-1-7.2 (single-family residential, 7,200 square-foot minimum lot size) located in the City’s SOI (Westerly Sphere) to facilitate the annexation of property into the City of Corona. As shown on Figure 4, Tentative Tract Map No. 36544, TTM 36544 was a proposal to subdivide the property to include a total of 292 single-family lots on approximately 270.9 acres, including numerous lettered lots to be set aside for open space, slope landscaping, streets, and utilities in the R-1-7.2 zone that were proposed as part of CZ13-002. TTM 36544 also was designed in a manner so as to facilitate the completion of the Foothill Parkway Westerly Extension, which consisted of two miles of new four-lane highway from Trudy Way to Paseo Grande at Green River Road that would connect Sierra del Oro to south Corona and that would include connections to the new section of Foothill Parkway from both Border Avenue and Mangular Avenue, via Chase Drive. As shown on Figure 5, Annexation No. 117, was a proposal for a Plan of Service and prezoning associated with the annexation of approximately 395 acres into the City from the unincorporated area of Riverside County, generally located southwest of Foothill Parkway and east of Paseo Grande within the City’s southwest SOI.
Richland Ventures, Inc. (herein, “Project Applicant”) has filed applications with the City of Corona for a Specific Plan (SP No. SP2025-0001) and a Revised Tentative Tract Map (TTM 36544R1), which collectively are referred to herein as the “Project” or “proposed Project.” As more fully discussed in Subsection 1.3, approval of these applications would allow for development of the 249.39-acre property with 92 single-family detached housing units (on 7,200 square foot [s.f.] lots), three custom single-family lots, 104 eight-cluster single-family detached housing units, and 77 four-cluster single-family detached housing units for a total of 276 units, along with private parks, public parks, pump stations/water tanks, and open space.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 1 Regional and Vicinity Map
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 2 General Plan Amendment No. 13-003
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 3 Change of Zone No. 13-002
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 4 Tentative Tract Map No. 36544
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 5 Annexation No. 117
SKYLINE HEIGHTS
Environmental Impact Report Addendum
1.2 Location and Surrounding Land Uses
As shown above on Figure 1, the Project site is located approximately 3 miles west of Interstate 15 (I-15) along the southwestern boundary of the City of Corona and is adjacent to, and southwest of, the Foothill Parkway Westerly Extension.
To the northeast of the Project site and the Foothill Westerly Extension, established single-family neighborhoods are situated. These areas are primarily zoned for low-density residential use (R-1-7.2, R-1-8.4, and R-1-9.6).
Interspersed among these residential neighborhoods are large, undeveloped parcels within the Open Space (OS) zone.
To the west and south of the project site lies the Cleveland National Forest, easily accessible via Skyline Drive, a graded forest service road located to the south. This road provides local and regional residents with recreational opportunities, including hiking and mountain biking, within the scenic and expansive National Forest.
1.3 Proposed Project Modifications
On February 1, 2017, the City of Corona City Council approved the Skyline Heights project (herein, “Approved Project”) and certified the Skyline Heights EIR (herein, “SHP EIR”). The Approved Project consisted of applications for a General Plan Amendment, Change of Zone, and a Tentative Tract Map (TTM 36544) to allow for future development of a 270.9-acre property1 located west of Foothill Parkway and north of Skyline Drive within the City of Corona, California. TTM 36544 entailed the subdivision of the property into 292 single family residential lots, as well as lettered lots for open space and landscaping. The Skyline Heights Project EIR determined that implementation of the Approved Project would result in significant and unavoidable impacts under the issue of Aesthetics but determined that all other impacts associated with the Approved Project would be less than significant or would be reduced to less-than-significant levels with the implementation of mitigation measures.
Subsequent to approval of the Approved Project, the Project Applicant, Richland Ventures, has identified design issues with the previously approved design and is proposing the Skyline Heights Specific Plan (SHSP) and Revision No. 1 to TTM 36544 (TTM 36544R1). These applications are described below.
1.3.1 Skyline Heights Specific Plan (SHSP)
The Skyline Heights Specific Plan (SHSP) is proposed to establish a master-planned community that accommodates 276 homes on 65.41 acres, 11.42 acres of private and public park space, two pump station/tank sites on 1.5 acres, HOA-maintained slopes on 49.07 acres, and the preservation of approximately 121.99 acres of undisturbed open space. Approval of the SHSP would provide the City of Corona with a set of regulations and guidelines to help create a high-quality planned residential community, ensuring the orderly development of the Project site and systematic implementation of the City’s General Plan. A description of the proposed SHSP is provided below, while a copy of the draft SHSP is included as Technical Appendix A to this EIR Addendum. 1 While the SHP EIR indicated that the property was 270.9 acres in size, approximately 21.51 acres of the Project site previously were dedicated to the City of Corona to accommodate the City’s Foothill Parkway Expansion Project, reducing the size of the Project site to 249.39 acres.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
a) Proposed Land Use Plan
As shown on Figure 6, Skyline Heights Specific Plan Land Use Plan, and as summarized in Table 1, Skyline Heights Specific Plan Land Use Allocation Summary, the SHSP would establish three (3) separate planning areas, as follows:
• Planning Area 1: SHSP Planning Area (PA) 1 would comprise approximately 35.72 acres in size, and would allow for 104 single-family dwelling units on minimum 7,200 square-foot (s.f.) lots in a cluster configuration on approximately 13.10 acres, with an overall residential density of 2.9 dwelling units per acre (du/ac) and an allowable density range of 3 to 6 du/ac. PA 1 also would accommodate 6.28 acres of slopes to be maintained by the Homeowners’ Association (HOA), along with 16.34 acres of undisturbed natural open space.
• Planning Area 2: SHSP PA 2 would encompass approximately 143.43 acres in size, and would allow for up to 95 single-family dwelling units on approximately 36.24 acres on minimum 7,200 s.f. lots, with an overall residential density of 0.7 du/ac and an allowable density range of 3 to 6 du/ac. PA 2 also would accommodate a 1.95-acre private park, 9.25 acres of public parks (that include 3.61 acres of natural open space), a 0.38-acre site for a proposed pump station/water tank, 30.19 acres of HOA-maintained slopes, and 65.42 acres of undisturbed natural open space.
• Planning Area 3: SHSP PA 3 would encompass approximately 70.24 acres in size, and would allow for up to 77 single-family dwelling units in a cluster configuration on approximately 16.07 acres, with an overall residential density of 1.1 du/ac and an allowable density range of 3 to 6 du/ac. PA 3 also would accommodate a private park on 0.22-acre, a 1.12-acre site for a pump station/water tank, 12.60 acres of HOA-maintained slopes, and 40.23 acres of natural open space.
Table 1 Skyline Heights Specific Plan Land Use Allocation Summary Planning Area Land Use Acres Density Range Density Units 1 Single Family District Cluster1 13.10 3-6 du/ac 2.9 du/ac 104 HOA Maintained Slopes 6.28 -- -- --
Natural Open Space 16.34 -- -- --
2 Single Family District1 36.24 3-6 du/ac 0.7 du/ac 95
Private Parks 1.95 -- -- --
Public Parks2 9.25 -- -- --
Pump Station/Tank Site 0.38 -- -- --
HOA Maintained Slopes 30.19 -- -- --
Natural Open Space 65.42 -- -- --
3 Single Family District Cluster1 16.07 3-6 du/ac 1.1 du/ac 77 Private Parks 0.22 -- -- --
Pump Station/Tank Site 1.12 -- -- --
HOA Maintained Slopes 12.60 -- -- --
Natural Open Space 40.23 -- -- --
Totals: 249.39 -- 1.1 du/ac 276
Notes:
1. Planning areas include local streets.
2. Public Park (Lot I) includes 3.61 acres of natural open space.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 6 Skyline Heights Specific Plan Land Use Plan
SKYLINE HEIGHTS
Environmental Impact Report Addendum
b) Proposed Circulation Plan
The SHSP would establish a general layout and design standard of roadways throughout the site to safely meet the transportation needs of the community. Primary access to the site would be from Foothill Parkway, approximately 100 feet north of its intersection with Mabey Canyon. A second access along Foothill Parkway is proposed to the south of Mabey Canyon, which would align with Border Avenue, a local street. The primary entry road, “B” Street, would intersect with “A” Street to provide public access to the three public community parks proposed along “E” Street. “E” Street would provide a connection road through the public park sites, extending to a small residential enclave to “M” Street. “M” Street would provide a third access/egress to the project from Trudy Way, an existing local street. Internal roadways would provide access to individual lots within PA 2, while private common driveways would provide access to the proposed cluster homes within PAs 1 and 3.
An emergency access also is proposed within PA 1 at “P” Street from Mabey Canyon Drive to provide access for emergency vehicles and vehicular ingress and egress of surrounding residents and future residents only in the case of an emergency. Vehicular access would be restricted via a gate, designed to be opened electronically by emergency services, while full pedestrian access would be accommodated at the emergency access gate. c) Public Facilities
i) Conceptual Domestic and Reclaimed Water Facilities
Domestic and Reclaimed Water service for the proposed SHSP would be provided by the City of Corona. Domestic and recycled water service would be accommodated via connections to existing facilities and by expanding the existing domestic and recycled water system.
For domestic (potable) water service, the SHSP occurs within City of Corona Pressure Zones 5 and 6A. Proposed Planning Area 1 of the SHSP is the only portion of the Project site that can receive service from the Zone 5 system.
An 8-inch domestic water line is proposed to be constructed on site within Planning Area 1 (i.e., within “P” Street) to connect to an existing 16-inch water line within Foothill Parkway. A series of 8-inch water lines would be constructed within local roadways within Planning Area 1 to provide domestic water service to individual homes.
In addition, the City has identified the need for an additional Zone 5 reservoir in this area to hydraulically balance the system due to the distance between Planning Area 1 and the existing Zone 5 storage tanks. As such, the SHSP accommodates a proposed 2.5-million gallon Zone 5 reservoir within the central portion of the Project site. A 16- inch transmission line would be constructed on site to connect the reservoir to the existing 16-inch Zone 5 water main located within Foothill Parkway.
The remaining portions of the SHSP area would be served by the Zone 6A system, which is a new Zone that would be formed by pumping water from the new Zone 5 reservoir to an on-site Zone 6A water tank that is proposed within the western portions of the Project site (northwest of the proposed Zone 5 reservoir). The proposed Zone 6A tank would be sized to serve only future development proposed on site, and would have a minimum capacity of 0.40 million gallons.
For reclaimed water service, the Project would be served by the City of Corona 1380 Zone (Zone 3) water lines, which currently are supplied by the Water Recycling Facility (WRF) 3 Booster Station and Border Avenue Booster Station. Under existing conditions there is a 12-inch reclaimed water line within Foothill Parkway adjacent to the
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Project site. The Project would connect to the existing 12-inch reclaimed water line at two separate locations at the entrances to Planning Areas 1 and 2. A proposed 1380/1625 Zone closed booster station is proposed along Border Avenue within the Project site to boost pressures in the system in order to supply reclaimed water to the upper elevations of the site. In addition to common landscape areas, the proposed reclaimed water system also would provide water service to fire hydrants proposed along local roadways throughout the site. ii) Conceptual Wastewater Management Plan
The SHSP is located within the City of Corona Master sewer collection system that is tributary to the City’s Wastewater Treatment Plant No. 1. As part of the Project a gravity sewer system would be developed to provide sanitary sewer service to all proposed lots within the Project. Sewer flows for the Project have been separated into three drainage areas. Proposed SHSP Planning Area 1 would comprise the northernmost drainage area, and 8-inch sewer lines would be constructed within the local roadways to connect to an existing 8-inch sewer line within Mabey Canyon Road. Sewer service for approximately 17 dwelling units within the southern portions of the Project site would be provided via a proposed 8-inch sewer line to be constructed on site within “E” Street, which would connect to an existing 8-inch sewer line within Trudy Way. For the remaining portions of the Skyline Specific Plan area, a series of 8-inch sewer lines would be constructed within local roadways on site, which would extend northeasterly across Foothill Parkway within Border Avenue to an existing point of connection at the intersection of Raven Circle and Border Avenue.
iii) Conceptual Drainage Master Plan
As part of the Project a publicly-maintained storm drain system would be constructed on site. This system would consist of drainage inlets to intercept runoff from the undeveloped open space areas, catch basins within the public roadways to intercept runoff within public streets, storm drain structures and manholes, storm drain pipelines and outlet facilities into four proposed water quality basins. These basins would discharge into four existing inlet facilities and the City of Corona storm drain system. At both discharge points to the city system, the existing capacities for each storm drain system would be able to adequately accept the site’s 100-year flow rates following detention by the two detention basins proposed on site. Permanent Best Management Practices (BMPs) for post construction mitigation primarily would consist of extended detention basins at the primary discharge points near the perimeter of the Project. Other BMP’s may be available and these improvements, if any, would be identified in the development of the site-specific Storm Water Pollution Prevention Program (SWPPP) and operational Water Quality Management Plan (WQMP ). All water quality facilities would be maintained by the HOA.
d) Conceptual Phasing Plan
Buildout of the SHSP is anticipated to occur in two separate phases. Phase 1 would consist of the development of residential uses within Planning Area 1 within the northern portions of the Specific Plan area (i.e., north of Mabey Canyon Road). Phase 2 would consist of development of the remaining portions of the Skyline Heights Specific Plan area. While it is anticipated that Phase 1 would consist of mass grading of the entire Specific Plan area, infrastructure needed to serve each phase of development would be constructed as part of each individual phase.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
e) Development Regulations
Section 4 of the SHSP includes development regulations that establish definitions of terms; generalized development standards; permitted uses, accessory uses, and conditionally-permitted uses; residential development standards; development standards for signage; development regulations for walls, fences, and landscaping; and development standards for natural open space and public parks. f) Community Design Guidelines
Section 5 of the SHSP includes community design guidelines that are intended to provide general design criteria for future development on site. This Section includes architectural design criteria related to siting, setbacks, building elevations, building forms, exterior materials/finishes, garages, doors/windows, exterior details, and lighting. Also included in this section are a description of allowable architectural styles, which include Spanish Eclectic, Transitional Craftsman, Tuscan Farmhouse, Italian Revival, European Cottage, Modern American Farmhouse, Midwest Traditional, and any other architectural design as may be approved by the City of Corona.
Finally, Section 5.3 of the SHSP includes a Landscape Master Plan, which establishes landscaping design criteria for future development on site, identifies design criteria for Project walls and signage, identifies design criteria for Project streetscapes, and establishes an overall Master Plant Palette for general development on site, a Plant Palette for the Project’s required fuel modification zones, and a Plant Palette for the Project’s proposed detention basins. The Community Design Guidelines also provide design criteria for walls and fencing within the SHSP area. g) Implementation and Administrative Procedures
Section 6 of the Skyline Heights Specific Plan sets forth the policies and procedures for the City of Corona’s review and approval of implementing development projects within the Skyline Heights Specific Plan area and describes the methods and procedures for interpreting and amending the Skyline Heights Specific Plan. This section also describes infrastructure financing mechanisms as well as requirements related to maintenance.
1.3.2 Revision No. 1 to Tentative Tract Map No. 36544 (TTM 36544R1) In addition to the SHSP, the Project evaluated herein also includes an application for the Revision No. 1 to Tentative Tract Map No. 36544 (TTM 36544R1). As previously noted, Tentative Tract Map No. 36544 (TTM 36544) originally was approved by the City of Corona City Council on February 1, 2017, and entailed the subdivision of the property into 292 single family residential lots, as well as lettered lots for open space and landscaping. Subsequent to approval of TTM 36544, the Project Applicant, Richland Ventures, identified design issues with the previouslyapproved design and is proposing Revision No. 1 to TTM 36544 to address these concerns. Assummarized in Table 2, Revision No. 1 to TTM 36544 Statistical Summary, and as shown on Figure 7, Revision No. 1 to Tentative Tract Map No. 36544, TTM 3654R1 would subdivide the 249.39-acre property to provide for 144 residential lots on 45.75 acres to accommodate up to 276 dwelling units (including 93 single-family detached housing units on minimum 7,200 s.f. lots, three custom single-family lots, 104 eight-cluster single-family detached housing units, and 77 fourcluster single-family detached housing units); open space, drainage, and HOA-maintained slopes on 171.06 acres; public streets on 19.66 acres; pump stations/tank sites on 1.50 acres; three public parks on 9.25 acres; and five private parks on 2.17 acres.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Figure 7 Revision No. 1 to Tentative Tract Map No. 36544
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Table 2 Revision No. 1 to TTM 36544 Statistical Summary Lot Nos. Land Use Acreage Dwelling Units
1 through 144 Residential 45.75 276
A-D, H, J, L, N-O, Q, S-T, VFF, HH-SS, and UU-WW Open Space/Drainage/HOA Maintained Slopes 171.06 0 Streets “A” through “T” Public Streets 19.66 0
G, M, P, and R Pump Station/Tank Site 1.50 0
F, I, and K Public Parks 9.25 0
E, U, GG, TT, and XX Private Parks 2.17 0
Totals: 249.39 276
In comparison to the approved TTM 36544, TTM 36544R1 would result in a reduction in the number of dwelling units by 16 dwelling units (from 292 dwelling units to 276 dwelling units). Areas planned for physical disturbance would be substantially reduced, as TTM 36544 included disturbances to approximately 170.70 acres of the site, while TTM 36544R1 would include disturbances to only 151.8 acres of the property. In general, areas proposed for physical disturbance by TTM 36544R1 mostly would occur within the limits of disturbance identified by TTM 36544. In addition, the proposed Project would result in a substantial reduction in the amount of grading proposed on site. Specifically, the Approved Project required 5.01 million cubic yards (cy) of cut and 4.93 million cy of fill with 421,805 cy of soil import, while the proposed Project would require 4.14 million cy of cut and 4.36 million cy of fill, with 215,000 cy of raw fill and 11,000 cy of adjusted fill. Consistent with the project evaluated in the SHP EIR, the proposed Project likely would require blasting during grading activities as it is likely that ledges and zones of extremely hard rock may be encountered.
1.4 Prior Environmental Documentation
The Skyline Heights Project (SHP) was approved by the City of Corona (“City”) City Council on February 1, 2017 (herein, “Approved Project”), at which time the City Council also certified the Skyline Heights Environmental Impact Report (herein, “prior EIR”; SCH No. 2014021003).
Richland Ventures previously applied to the City of Corona for certain land use entitlements necessary to develop 292 single-family residences on an approximately 270.9-acre site within an undeveloped hillside area to the south/southwest of the Foothill Parkway Westerly Extension. At the time the Skyline Heights EIR was prepared, the site was located within the City of Corona Sphere of Influence (SOI) in unincorporated Riverside County. In order to facilitate development of the Foothill Parkway Westerly Extension, the Applicant proposed the annexation of the Project site and surrounding parcels totaling approximately 294.8 acres to the City of Corona, and therefore the City of Corona was the lead agency for the Approved Project. The Approved Project involved the review of Tentative Tract Map 36544 for the development of the 292 single-family homes. In order to facilitate the development of the residential subdivision, the following entitlements were necessary:
• Annexation 117: Application for annexation of 394.8 acres from unincorporated Riverside County in the City of Corona’s southwest Sphere of Influence (SOI) to the City of Corona. The northernmost portion of the annexation (identified as Property 1) is located south of Green River Road where it intersects with Paseo Grande, and the southernmost portion of the annexation (identified as Property 2) is located generally south of the westerly extension of Foothill Parkway, and west of Trudy Way.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
• General Plan Amendment No. GPA13-003: General Plan Amendment to change 357.14 acres from Rural Residential I (0.2-0.5 dwelling units/acre) to Low Density Residential (3-6 du/ac) and 37.61 acres to Open Space located generally south of the westerly extension of Foothill Parkway, east of Paseo Grande and west of Trudy Way.
• Change of Zone No. CZ13-002: Application to pre-zone 37.61 acres to Open Space, 86.23 acres to Agriculture, and 270.9 acres to R-1-7.2 (Single Family Residential, 7,200 square foot minimum lot size) located generally south of the westerly extension of Foothill Parkway, east of Paseo Grande and west of Trudy Way.
• Tentative Tract Map No. 36544: Application to subdivide approximately 271 acres into 292 single family residential lots and lettered lots for open space and landscaping located generally south of the westerly extension of Foothill Parkway, east of Paseo Grande and west of Trudy Way. The shaded area of Property 2 is the location of TTM 36544.
A Draft EIR for the Approved Project was made available for public comment beginning on 12/4/2015 and ending on 1/19/2016. The Draft EIR for the Approved Project was recirculated and made available for public comment beginning on 11/16/2016 and ending on 12/30/2016. The Draft EIR was recirculated to include additional information and analysis on biological resources on the Project site, as well as the potential impacts to such resources from implementing the project. Revised mitigation measures were identified and included to address the biological impacts considered potentially significant. The Final EIR was certified by the City of Corona City Council in conjunction with its approval of the above applications on February 1, 2017.
1.5 Basis for an Addendum
The CEQA Guidelines allow for the updating and use of a previously-certified EIR for projects that have changed or are different from the previous project or conditions analyzed in the certified EIR. In cases where changes or additions occur with no new or more severe significant environmental impacts, the Lead Agency is required to prepare an Addendum to a previously certified EIR. See CEQA Guidelines § 15164. The following describes the requirements of an Addendum, as defined by CEQA Guidelines § 15164:
a. The lead agency or responsible agency shall prepare an Addendum to a previously certified EIR if some changes or additions are necessary but none of the conditions described in § 15162 calling for preparation of a Subsequent EIR have occurred.
b. An Addendum to an adopted negative declaration may be prepared if only minor technical changes or additions are necessary or none of the conditions described in § 15162 calling for the preparation of a subsequent EIR or negative declaration have occurred.
c. An Addendum need not be circulated for public review but can be included in or attached to the Final EIR. d. The decision-making body shall consider the Addendum with the Final EIR prior to making a decision on the project.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
e. A brief explanation of the decision not to prepare a Subsequent EIR pursuant to § 15162 should be included in an Addendum to an EIR, the lead agency’s findings on the project, or elsewhere in the record. The explanation must be supported by substantial evidence.
As noted above, CEQA Guidelines § 15164(a) and (b) allow for the preparation of an Addendum if none of the conditions described in § 15162 are met. CEQA Guideline § 15162 describes the conditions under which a Subsequent EIR must be prepared, as follows:
a. When an EIR has been certified or a negative declaration adopted for a project, no subsequent EIR shall be prepared for that project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following:
1. Substantial changes are proposed in the project which will require major revisions of the previous EIR due to the involvement of environmental effects or a substantial increase in the severity of previously identified significant effects;
2. Substantial changes occur with respect to the circumstances under which the project is undertaken, which will require major revisions of the previous EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects; or
3. New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete, shows any of the following:
a. The project will have one or more significant effects not discussed in the previous EIR; b. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
c. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible, and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternatives; or d. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative. (See CEQA Guidelines § 15162)
b. If changes to a project or its circumstances occur or new information becomes available after adoption of a negative declaration, the lead agency shall prepare a subsequent EIR if required under subdivision (a).
Otherwise, the lead agency shall determine whether to prepare a subsequent negative declaration, an addendum, or no further documentation.
c. Once a project has been approved, the lead agency's role in project approval is completed, unless further discretionary approval on that project is required. Information appearing after an approval does not require reopening of that approval. If after the project is approved, any of the conditions described in subdivision (a) occurs, a subsequent EIR or negative declaration shall only be prepared by the public agency which grants the next discretionary approval for the project, if any. In this situation no other responsible
SKYLINE HEIGHTS
Environmental Impact Report Addendum
agency shall grant an approval for the project until the subsequent EIR has been certified or subsequent negative declaration adopted.
d. A subsequent EIR or subsequent negative declaration shall be given the same notice and public review as required under Section 15087 or Section 15072. A subsequent EIR or negative declaration shall state where the previous document is available and can be reviewed.
If none of the circumstances listed above occur and only minor technical changes or additions are necessary to update the previously approved/certified CEQA document, an Addendum shall be prepared (See CEQA Guidelines § 15164(a)). As described in detail in the Initial Study provided herein in Section 2.0, Environmental Checklist, none of the above circumstances that warrant the preparation of a Subsequent EIR are present.
1.6 Mitigation Measures
Below is a list of mitigation measures provided in the SHP EIR. Because construction for the Project has yet to commence, the majority of the mitigation measures from the previously certified EIR are still relevant. Any modifications to mitigation measures are shown in strikeout/underline format in the table below.
Mitigation No. Mitigation Measure/Implementing Action
Biological Resources
BIO-MM1 Biological Monitor/BMPs. The project impact areas and avoidance areas shall be flagged or fenced prior to clearing to prevent incursion into unsurveyed or avoided areas. A qualified biological monitor(s) shall monitor work activities during the initial clearing and grading phase of construction (including any ground or vegetation disturbance, demolition, fence installation, grading of existing roads, material delivery, etc.). The monitoring biologist shall ensure the flagging or fencing remains intact and no incursions into avoided areas occurs. The monitoring biologist shall examine each area of impact as the clearing/grading operations move into an uncleared native habitat area or into any area that has had a lapse in construction for more than 30 days to ensure no sensitive wildlife species are present. The biologist shall inspect debris piles, pipes, burrows, vegetation, leaf litter piles, and other potential refugia for sensitive wildlife species prior to initiation of clearing, grubbing, grading, or any other Project activity that may injure or kill sensitive wildlife species.
If wildlife is discovered, the biological monitor shall take appropriate action as defined in the mitigation measures, permit conditions, and regulations. The biological monitor may move wildlife or humanely encourage it to move out of harm’s way, if safe and feasible and permitted to do so.
Potential day roosts for pallid bat (e.g., caves, crevices, mines, hollow trees, buildings, etc.) shall be inspected by a qualified bat biologist prior to initial ground disturbance. If bats are roosting, a bat exclusion plan shall be prepared and submitted to CDFW for review prior to impacts. If a colony is discovered during the breeding season (March 1 -October 1), the biologist shall determine appropriate avoidance measures, including, but not limited to sound walls, buffers, and Project phasing/timing, to prevent disturbance to the colony until all young are weaned and capable of foraging independently.
Monitoring and survey activities shall be documented on a daily basis. All monitoring reports and communications shall be retained in Project files to allow review by the City of Corona, CDFW, and USFWS, if requested.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
BIO-MM2 Special Status Botanical Species. Mitigation shall be provided forThe following measures shall apply to address and minimize potential impacts to Coulter’s matilija poppy, intermediate mariposa lily, and chaparral nolina to the extent feasible.
Impacts shall be minimized and avoided to the extent feasible. Prior to commencement of ground-disturbing activities (i.e., clearing and grading), Coulter’s matilija poppy and intermediate mariposa lily plants within the development footprint shall be salvaged for use in the Project area, avoidance area, or reuse in local restoration projects. In addition, a qualified botanist shall collect seeds from plants within the grading impact area during the spring or summer before grading commencement.
Prior to commencement of ground-disturbing activities (i.e., clearing and grading), Iimpacts to chaparral nolina shall be mitigated through translocation and seed collection with propagation to an on-site or off-site preserved property acceptable to the City. Prior to any ground disturbance, the Applicant shall prepare a Chaparral Nolina Planting Plan (Plan) for chaparral nolina. The property shall be composed of habitat characteristics suitable to support chaparral nolina, including but not limited to: appropriate soils, elevation, and supporting chaparral or coastal sage scrub (or a combination thereof) habitat. The property shall be conserved via recordation of a conservation easement or deed restriction in favor of a California Department of Fish and Wildlife (CDFW)-due diligence approved local conservation entity to protect chaparral nolina on the property in perpetuity. Alternatively, the land may be transferred in fee title to a CDFW-approved local conservation entity. A management fund shall be established by the Applicant and will consist of an interest-bearing account with the amount of capital necessary to generate sufficient interest and/or income to fund all monitoring, management, and protection of the conservation area(s), including but not limited to, reasonable administrative overhead, biological monitoring, invasive species and trash removal, signage replacement and repair, law enforcement measures, long-term management reporting (as described below), and other actions designed to maintain and improve the habitat of the conserved land(s), in perpetuity.
Prior to commencement of ground-disturbing activities, a Property Analysis Record, or substantially equivalent analysis, shall be conducted by the Applicant and approved by the City to determine the management needs and costs described above, which then will be used to calculate the capital needed for the management of the fund. This management fund shall be held and managed by a CDFW-approved local conservation entity. To protect the mitigation area(s), the Project Applicant shall place appropriate signage around the perimeter of each site.
Except for uses appropriate to a habitat conservation area, the public shall not have access to the mitigation area(s), and no activities shall be permitted within the mitigation areas, except maintenance of habitat, including the removal of nonnative plant species, trash, and debris, and the installation of native plant materials. Prior to any ground disturbance, the Applicant shall prepare a Chaparral Nolina Planting Plan (Plan) for chaparral nolina. The Plan shall require a replacement ratio of 1:1 by area, and ensure a minimum 90 percent survivorship at the end of a five-year monitoring period, which shall be verified by the monitoring biologist (minimum qualifications of the monitoring biologist are specified below). At a minimum, the five-year plan shall include the following information:
1. a description of the existing conditions of the receiver site(s) characterizing the suitability of the site(s) for chaparral nolina, and documenting the acreage of the site,
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
2. a description of how the site will be preserved in perpetuity, e.g., conservation easement, deed restriction, etc., and the name of the CDFW-approved due diligence entity that will hold the easement/deed restriction, etc.,
3. qualifications of the monitoring biologist. At a minimum the monitoring biologist will possess a minimum of five-year's experience conducting habitat restoration projects in coastal sage scrub and/or chaparral habitat in Riverside County, California,
4. receiver site preparation for transplanting,
5. goals for success,
6. schedule,
7. propagation techniques,
8. transplant and seedling installation methods,
9. plant spacing,
10. performance criteria for success, including provision for control of non-native and invasive species,
11. monitoring and reporting procedures for each of the five years of the monitoring period,
12. adaptive management strategies, including a contingency plan should the site fail to meet the specified success criteria, and
13. maintenance requirements that will be reviewed and approved by the City. The Plan shall also ensure a mixture of both male and female plants.
BIO-MM3 Compensation Parcel. Prior to issuance of a grading permit, the project Applicant shall preserve a minimum of ten (10) acres (a 1:1 ratio) of natural habitat, which shall be biologically equivalent or superior to the Public/Quasi-Public (PQP) land the project site surrounds, and shall be located adjacent to USFS land. The compensation parcel shall either be:
1. Deeded in fee title to the United States Forest Service (USFS) or Western Riverside County Regional Conservation Authority (RCA) to ensure appropriate protection and permanent habitat management in perpetuity, or
2. Conserved via recordation of a conservation easement or deed restriction in favor of a CDFWdue diligence approved local conservation entity.
BIO-MM4 Designate Unimpacted Areas as Open Space. Prior to recordation of Final Maps for each phase of the proposed development, Tthose areas of the project site not impacted by the project footprint, including Riparian/Riverine and excluding the minimum 10-acre preservation area identified in BIOMM3, shall be conserved in perpetuity via the recordation of a conservation easement or deed restriction in favor of a CDFW-approved local conservation entity; or transferred in fee title to a CDFW-approved local conservation entity. The avoided Riparian/Riverine areas shall be conserved prior to issuance of a grading permit. The CDFW-approved local conservation entity shall manage the conservation areas to protect the long-term conservation, functions and values in-perpetuity.
BIO-MM5 Other Species to Avoid in Landscaping. Prior to issuance of grading permits, building permits, and/or road improvement plans, the Project Applicant shall prepare a landscape plan for review and approval by the City of Corona The landscape plan shall prohibit the use of The project Applicant shall add more common cultivar forms of Coulter’s matilija poppy to the list of plants to be avoided in site landscaping, including White Cloud matilija poppy. Additional non-native plants to be
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
avoidedthat shall not be planted within any onsite mitigation or landscaping include coyote brush (Baccharis pilularis) and fourwing saltbush (Atriplex canescens). In addition, the landscape plan shall exclude those species identified in Table 6-2, Plants that Should be Avoided Adjacent to the MSHCP Conservation Area, of the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP). To ensure these non-native plants are not used in landscaping within the project site, the project Applicant shall include a list of plant species to avoid within the CC&Rs for the development.
The project applicant shall also develop and distribute a suitable homeowner education package to residents / new owners covering the species to avoid.
BIO-MM6 Oak Tree Replacement. The project Applicant shall replace oak trees impacted by the project at a ratio consistent with the City of Corona oak tree conservancy policy (10.10.5), at no less than a 2:1 ratio. Replacement trees shall be located in undeveloped natural areas suitable to support these trees or in onsite mitigation areas where possible. If spacing requirements limit the number of replacement trees in these areas additional plantings may be located in landscaped areas as close to open space as feasible. All replacement trees shall be planted prior to issuance of the Certificate of Occupancy.
BIO-MM7 Riparian/Riverine. Prior to issuance of a grading permit, the project Applicant shall provide mitigation for ±10.5107 acres of Riparian/Riverine impacts at no less than a 2:1 basis, as determined through consultation with the City of Corona and wWildlife aAgencies based on their approval of the Determination of Biologically Equivalent or Superior Preservation (“DBESP”; see SHP EIR Addendum No. 1 Technical Appendix D2) that provides a functions and values analysis pursuant to the requirements of the MSHCP. The project Applicant proposes mitigation in the form of offsite mitigation with the Riverside-Corona Resource Conservation District (RCRCD) or other suitable approved organization with available credits. Currently, mitigation in banks is favored to preserve large areas of habitat where it is needed to fulfill the conservation goals of the MSHCP. In the event mitigation with the RCRCD is not finalized for any reason, the project Applicant shall provide equal or greater value mitigation in one or more of the following forms: offsite acquisition and preservation, participation in an approved mitigation bank, onsite creation, offsite creation, enhancement, or reestablishment. If offsite mitigation is incorporated, the preferred choice shall be to find mitigation within or adjacent to the Santa Ana Watershed and in or adjacent to Corona if possible. In addition, some avoided resources within the open space areas shall be preserved to the extent feasible pursuant to a in an open space area and deed restrictioned or other appropriate legal mechanism to prevent future development.
If onsite mitigation is proposed as an alternative mitigation, the project Applicant shall prepare a Habitat Mitigation and Monitoring Plan (HMMP) shall be developed and provided for review and approval by local and regulatory agencies, which and shall include at a minimum the following components:
• Quantitative success criteria (vegetation cover and species richness); • Recommendations for soil preparation;
• A plant palette to include native species occurring on the site, such as coast live oak and Coulter’s matilija poppy;
• Planting methods;
• Irrigation and maintenance requirements; and
• A long-term mitigation maintenance and monitoring plan with remedial measures.
BIO-MM8 Storm Water Pollution Prevention Plan. Prior to the first ground disturbance issuance of a grading permit, the project Applicant shall prepare and implement a Storm Water Pollution Prevention Plan or for City of Corona review and approval of a Stormwater Pollution Prevention Plan (SWPPP), which
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
shall identify all standard best management practices (BMPs) to prevent discharges from entering avoided jurisdictional drainages WoUS during construction. The required SWPPP shall at a minimum include BMPs shall that include but are not be limited to:
• Use of erosion control or sedimentation prevention methods, such as fiber rolls, sand bags, rice mats, straw wattles, or similar measures, where appropriate; and • Proper use and disposal of oil, gasoline, diesel fuel, antifreeze, and other toxic substances will be enforced.
Compliance with the City-approved SWPPP shall be required as a condition of grading permit approval, compliance with the SWPPP shall be required by bid documents issued to prospective construction contractors, and the Project construction contractors shall permit periodic inspection of the construction site by City of Corona staff or its designee to confirm compliance during all construction activities.
BIO-MM9 Regional Water Quality Control Board Permit. Prior to the issuance of a grading permit, to mitigate for the loss of 1.4857 acres and temporary loss of ±0.25-acre of State waters regulated by nonwetland WoUS due to project construction, project Applicant shall enter into an agreement with the U. S. Army Corps of Engineers (via issuance and implementation of a Nationwide permit or Individual permit) and with the California Santa Ana Regional Water Quality Control Board (via issuance and implementation of a Clean Water Act [CWA] Section 401 Certification) to replace permanentlyimpacted State waters as specified by the agreement with RWQCB affected WoUS and wetlands at a ratio specified by the U. S. Army Corps of Engineers and California Regional Water Quality Control Board, but at not less than a 2:1 basis, through offsite acquisition and preservation, participation in an approved mitigation bank, and/or on or offsite creation, enhancement, or reestablishment of WoUS State waters or a combination of these options. Temporary impacts to RWQCB State waters shall be mitigated through on-site restoration within the temporarily impacted areas or as otherwise specified by the CWA Section 401 certification. The exact ratio shall be based on a functions and values assessment included in the Project’s Determination of Biologically Equivalent or Superior Preservation (“DBESP”; see SHP EIR Addendum No. 1 Technical Appendix D1) and pursuant to RWQCB’s approval. Preparation of a Habitat Mitigation and Monitoring Plan (HMMP) outlining the details of the mitigation shall be required for any on-site mitigation or off-site mitigation on lands not already subject to an RWQCB-approved HMMP.
BIO-MM10 California Department of Fish and Wildlife Permit. Prior to the issuance of a grading permit, to mitigate for the loss of ±10.5107 acres of streambed and wetlands and the temporary loss of ±1.13 acres of streambed due to project construction, the project Applicant shall enter into an agreement with the California Department of Fish and Wildlife (CDFW) via issuance and implementation of a Section 1600 Streambed Alteration Agreement , Section 1600) to replace affected streambed at not less than a 2:1 basis (mitigation:impact) for permanent impacts and restoration of temporarily impacted areas to their existing/former condition, as specified by the California Department of Fish and Wildlife, through a combination of offsite acquisition and preservation, participation in an approved mitigation bank, and/or on or offsite creation, enhancement, or reestablishment of the streambed. The exact ratio shall be based on a functions and values assessment pursuant to CDFW’s approval of the required Streambed Alteration Agreement. Preparation of a Habitat Mitigation and Monitoring Plan (HMMP) outlining the details of the mitigation shall be required for on-site mitigation or off-site mitigation on lands not already subject to a CDFW-approved HMMP.
BIO-MM11 Nesting Birds. To prevent impacts to sensitive, migratory, and nesting birds (including raptors), clearing, or other work in native habitats, should shall be avoided during the critical nesting period
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
of January 1 – September 1. If work cannot be avoided during this timeframe, a nesting bird survey shall be conducted by a qualified biologist within three (3) days prior to initiation of clearing and/or grading. A letter report documenting the clearance survey and its results shall be provided to the City of Corona prior to any disturbance to the Project site. If nesting birds are present, a nesting bird plan will shall be developed and implemented and to include appropriate measures to mitigate potential impacts, including maintaining a buffer area until fledging has occurred. Active bird nests should shall be mapped utilizing a hand-held global positioning system (GPS) (getting as close as possible without disturbing the nest) and a buffer will be flagged around the nest (typically 300 feet for most species, 500-foot buffer for raptor nests), as determined appropriate by the biologist. Construction should not be permitted within the buffer area while the nest continues to be active (eggs, chicks, etc.).
Once fledging has occurred no further avoidance is required.
BIO-MM12 Burrowing Owl. A pre-construction burrowing owl clearance survey shall be conducted by an experienced burrowing owl qualified biologist no more than 30 days before earth disturbance (construction). The survey will be conducted as close to the actual construction initiation date as possible. A letter report documenting the clearance survey and its results shall be provided to the City of Corona prior to any disturbance to the Project site and prior to commencement of grading activities. If owls are present, the project biologist will shall consult with local and state agencies, as appropriate, and develop a mitigation plan. Mitigation will be based on the following goals and requirements included in the MSHCP:
1. If the site contains or is part of an area supporting less than 35 acres of suitable habitat or the survey reveals that the site and the surrounding area supports fewer than three (3) pairs of burrowing owls, the onsite burrowing owls will be passively or actively relocated following accepted protocols.
2. Occupied nests shall be avoided during the nesting season (February 1 – August 31) and a buffer of 300 to 500 feet shall be employed, depending on the level of disturbance surrounding the burrow.
3. Burrow exclusion shall be utilized outside of the nesting season by installing a one-way door in burrow openings. The burrow shall be closed following verification burrows are empty (through site monitoring and scoping).
4. If the site (including adjacent areas) supports three (3) or more pairs of burrowing owls, supports greater than 35 acres of suitable habitat, and is non-contiguous with MSHCP Conservation Area lands, at least 90 percent of the area with long-term conservation value and burrowing owl pairs will be conserved onsite.
BIO-MM13 AMountain Lion Program. Prior to issuance of a grading permitthe first Certificate of Occupancy for each phase of development, a mountain lion (Puma concolor) program shall be developed by the project Applicant for City review and approval in an effort to reduce likelihood of human-lion conflicts. The program shall include the following components:
1. A suitable homeowner education package for distribution to residents / new owners;
2. A suitable road sign program warning of the presence of mountain lions and the need for reduced speeds and increased caution;
3. A suitable CC&R provision limiting unsupervised outdoor pets and pet feeding practices that may encourage mountain lions to enter residential yards in search of food; and
4. A suitable mountain lion safety plan.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
The Project’s CC&Rs shall include a provision specifically requiring future homeowners to comply with the requirements of the Mountain Lion Program.Compliance with the mountain lion program shall be made a condition of grading and building, and an appropriate provision shall be included in the Project’s CC&Rs.
BIO-MM14 A qualified biologist shall monitor clearing and grubbing activities as they impact vegetation on the site. A qualified biologist shall inspect debris piles, pipes, burrows, vegetation, leaf litter piles, and other potential refugia for sensitive wildlife species prior to initiation of clearing, grubbing, grading, or any other project activity that may injure or kill sensitive wildlife species. If wildlife is discovered, the qualified biologist shall move it out of harm’s way or allow it to move safely out of the work area prior to initiation of project activities.
Potential day roosts for pallid bat (e.g., caves, crevices, mines, hollow trees, buildings, etc.) shall be inspected by a qualified bat biologist prior to initial ground disturbance. If bats are roosting, a bat exclusion plan shall be prepared and submitted to CDFW for review prior to impacts. If a colony is discovered during the breeding season (March-October), the biologist shall determine appropriate avoidance measures, including, but not limited to sound walls, buffers, and project phasing/timing, to prevent disturbance to the colony until all young are weaned and capable of foraging independently.
BIO-MM15 Homeowner Education Package (Invasive Species). Prior to issuance of occupancy permits, the Project Applicant shall develop for review and approval by the City of Corona, a homeowner education package providing and informing future occupants that the list of plant species identified in Mitigation Measure BIO-5 are prohibited and may not be planted on any individual lot. The homeowner education package also shall include a list of recommended non-prohibited plant species. A copy of the City-approved homeowner education package shall be provided to future owners/tenants as part of all future lease/sales agreements. Design guidelines for the proposed project shall provide the new homeowners with a list of native landscaping materials permitted within the development area. These materials have been selected for their contribution to the project theme, adaptability to local climatic and soil conditions, and for their compatibility with the unique natural environment in the area. None of the plants listed in Section 6.1.4 of the MSHCP will be utilized in the development and their use by future homeowners will be prohibited. The MSHCP has identified invasive plants that should be removed from open space areas. This list is included in Table 6-2 of the MSHCP and in Appendix C, and shall be included in the CC&Rs prepared for the subdivision.
BIO-MM16 Invasive Vegetation Control – Heavy Equipment. All heavy equipment used onsite shall be washed, particularly the wheels and under carriage, prior to bringing it onto the project site from other construction sites to prevent the spread of weedy species.
BIO-MM17 Invasive Vegetation Control – Staging Areas. Staging areas shall be placed in areas that have been previously disturbed or have degraded habitat within the project footprint but do not show an infestation of non-native species. Staging areas shall be maintained in a weed/noxious weed-free condition.
BIO-MM18 All refuse created or brought onsite by clearing personnel or contractors shall be placed in covered containers, removed from the site daily, and disposed of properly.
BIO-MM19 Field crews shall maintain the speed limit on posted roads and limit vehicle/truck speeds on unpaved surfaces to 15 miles per hour or less.
BIO-MM20 Urban/Wildlands Interface. Prior to issuance of grading or building permits, the City of Corona shall review the grading/building plans to ensure that measures Applicant shall ensure that the grading and building plans have incorporated the measures to meet the requirements of the The proposed
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
project shall incorporate measures to meet MSHCP Urban/Wildlands Interface guidelines and requirements (see MSHCP Volume I, Part 2 of 2, subsection 6.1.4) with respect to These measures will address Drainage, Toxics, Lighting, Noise, Barriers, Access, Pets, and Grading/Land Development (See Section 9.5 of the BRA Report included in Appendix D to this Draft EIR).
BIO-MM21 Crotch’s Bumble Bee. In the event the Crotch’s bumble bee (Bombus crotchii) status is listed as candidate, threatened or endangered by the CDFW at the time of construction, the following measures shall be implemented.
• Clearing/ground-disturbing activities shall be prohibited from February 1 through September 30 within suitable habitat for the Crotch’s bumble bee. As part of this requirement, if construction is proposed during this period, a qualified biologist shall go out and mark all of the suitable habitat on site, which must be avoided and fencing provided around any accessible areas until at least September 30. A letter report documenting the actions performed and completion of this measure shall be provided to the City of Corona prior to any disturbance of the Project site. Construction activities may commence in areas outside of suitable habitat for the bee.
• For construction between October 1 and January 31, a pre-construction survey is required within suitable habitat to confirm that no nests occur on site. Should any nests be identified, the Project biologist shall consult with CDFW to determine if permits are required. Clearance within that portion of the property determined by the biologist to support a nest and a suitable buffer shall be avoided until consultation with the CDFW determines activities can resume or the site is no longer occupied. If the pre-construction survey identifies no nests, then construction activities may proceed as normal. A letter report documenting the actions performed and completion of this measure shall be provided to the City of Corona prior to any disturbance of the Project site. If consultation with the CDFW is required a second letter report shall be provided documenting the CDFW determination, requirements and approval prior to moving forward with construction activities on that portion of the Project site. • Pesticides considered harmful to the Crotch bumble bee shall be prohibited during construction.
BIO-MM22 Workers Environmental Awareness Program. All persons employed or otherwise working on the Project site during the vegetation clearing and grading phase of construction shall attend a Workers Environmental Awareness Program (WEAP) training. All workers must attend WEAP training prior to performing any work on-site. The WEAP shall consist of a presentation (either provided in person by the biological monitor or a recorded training session) that includes a discussion of the biology of the habitats and species that may be present at the site. The WEAP shall also include information about the special-status plant and wildlife species that may be present, legal protections for those species, penalties for violations, and mitigation measures. The WEAP shall include but not be limited to burrowing owl, nesting birds, and other special-status species. The WEAP shall also include information on weed control practices, appropriate trash disposal, fire prevention and procedures for smoking, spill prevention and procedures, jurisdictional waters and SWPPP, BMPs, biological monitors and compliance responsibilities, and other issues such as pets, firearms, etc. Attendance at training shall be documented and construction workers provided with a hardhat sticker. Supporting materials shall be provided to all personnel during the training program, including contact information for the biological monitor and/or other compliance personnel. Informal or formal refresher training shall be conducted as needed to maintain compliance.
BIO-MM23 Restoration. Prior to final grading inspection, temporary impact areas associated with the haul road required during site mass grading activities shall be restored to its former condition.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
BIO-MM24 Invasive Species Restrictions and CC&Rs. Prior to issuance of occupancy permits, the Project Applicant shall provide the City of Corona with a copy of the Project’s Codes, Covenants, and Restrictions (CC&Rs). The Project CC&Rs shall explicitly prohibit the planting of the non-native plant species identified by Mitigation Measure BIO-5.
PDF BIO-1 Drainage. The project incorporates project streets, open channels and natural drainage courses as well as a comprehensive system of underground storm drains to handle storm runoff from the project site. Storm water from the project site and off-site areas will be directed to storm drains. The design and operation of the drainage channel shall be adequate to preclude discharge of water into open space areas that are of lower quality or higher quality than current conditions. The proposed development shall incorporate measures, including measures required through the NPDES requirements, to ensure that the quantity and quality of runoff discharged to the open space area is not altered in an adverse way when compared with existing conditions. In particular, measures shall be put in place to avoid discharge of untreated surface runoff from developed and paved areas into open space areas. Stormwater systems shall be designed to prevent the release of toxins, chemicals, petroleum products, exotic plant materials, or other elements that might degrade or harm biological resources or ecosystem processes within open space areas. This will be accomplished using a variety of methods including natural detention basins, grass swales, or mechanical trapping devices. Regular maintenance shall occur to ensure effective operations of runoff control systems.
PDF BIO-2 Toxics. The proposed project is designed to utilize natural drainage patterns for the flow of surface water. Water Quality Best Management Practices (BMPs) include education, storm drain stenciling, and street sweeping in compliance with the City of Corona’s requirements. The earthen channel shall be signed to filter potential toxics in the storm water prior to its discharge into open space areas.
These BMPs will be implemented as part of the storm water pollution prevention measures for the project, in accordance with all appropriate NPDES requirements. The project would result in the additional use of hazardous materials in limited quantities associated with normal residential use such as cleaning products, solvents, herbicides, and insecticides. However, compliance with regulations will reduce the potential risk of hazardous material exposure to a level that is less than significant. An information pamphlet has been prepared for each homeowner regarding the use of toxics.
PDF BIO-3 Lighting. Outdoor lighting of residences will be designed so that all direct beams would be confined to dwelling sites. Project lighting will not intrude into the open space conservation areas. Street lighting, parking lot lighting, and other project-related illumination sources will be positioned, directed, and shielded so as to avoid “light spill” into the conserved areas. The proposed project will avoid any night lighting adjacent to the open space areas. Night lighting will not be used during the course of construction unless absolutely necessary. If necessary, the lights will be directed and shielded to minimize lighting of the surrounding habitat. The level of off-site lighting and lighting fixtures would comply with the applicable requirements and policies of the City of Corona.
PDF BIO-4 Noise. The proposed project incorporates landscape elements including trees, shrubs, and groundcover, which will assist in noise reduction on the project site. In addition, a noise analysis prepared for the project found that no proposed on-site or surrounding sensitive land uses would experience long-term noise levels in excess of 65 dBA during the daytime hours under build-out of the proposed project. This daytime noise level would not result in exterior nighttime levels greater than 45 dBA. Therefore, no noise created on the project site would exceed residential noise standards.
PDF BIO-5 Invasives. Exotic Vegetation Control – Design guidelines for the project will provide the homeowners with a list of native landscaping materials permitted within the project site. These materials have been selected for their contribution to the project theme, adaptability to local climatic and soil
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
conditions, and for their compatibility with the unique natural environment in the project site. The MSHCP has identified exotic invasive plants that should be areas avoided adjacent to the MSHCP Conservation Area in Table 6-2, Section 6.1.4 of the MSHCP; none of these plants will be utilized for the proposed project and their use by future homeowners will be prohibited.
PDF BIO-6 Barriers. The proposed project will include theme walls along project perimeter streets adjacent to public streets, and will include walls and fencing located where public view and/or important interfaces are of concern. The proposed project will incorporate special edge treatments designed to separate development areas from open space areas. These areas of native landscaping and fencing will serve to minimize unauthorized public access, domestic animals predation, and illegal trespass and dumping. Exclusion fencing will be permanently placed where development abuts avoided and adjacent open space areas. The exclusion fence will be a minimum of eight feet in height and will be installed and maintained for the purposed of controlling human and pet access (cats and dogs) into the open space area and be in compliance with MSHCP requirements. The fencing will be permanent and will be maintained in perpetuity. Approval of the fencing design will be required by the City of Corona prior to project initiation.
PDF BIO-7 Access. Access points between native habitats and the project development will be posted with signage requesting residents to stay on the trails and not to disturb habitat. Yard fencing with no back gate will reduce access to native habitats adjacent to the project.
PDF BIO-8 Pets. Uncontrolled pets, feral dogs and cats can predate on native wildlife species. Appropriate signage will be posted requesting residents leash their pets. Homeowner Educational pamphlets will be used to inform them of the potential impacts by uncontrolled pets on native habitats and to request residents be good stewards of the land and prevent or limit their domestic cats from being allowed to openly hunt in the avoidance area.
PDF BIO-9 Grading/Land Development. All manufactured slopes associated with site development will be within the project site and there will be no impact to the MSHCP Conservation Area. All manufactured slopes that abut the natural open space will be retained as open space buffer zones.
All manufactured slopes and areas disturbed by construction of these slopes will be revegetated with appropriate non-invasive buffer species during project construction.
Cultural Resources
CR-1 Tribal Monitoring. Prior to the issuance of a grading permit the applicant shall contact the consulting Native American Tribe(s) that have requested monitoring through consultation with the City during the SB 18 process ("Monitoring Tribes”). The applicant shall coordinate with the Tribe(s) to develop individual Tribal Monitoring Agreement(s). A copy of the signed agreement(s) shall be provided to the City of Corona Planning Department prior to the issuance of a grading permit. The Agreement shall address the treatment of any known tribal cultural resources (TCRs) including the project's approved mitigation measures and conditions of approval; the designation, responsibilities, and participation of professional Tribal Monitors during grading, excavation and ground disturbing activities; project grading and development scheduling: terms of compensation for the monitors; and treatment and final disposition of any cultural resources, sacred sites, and human remains/burial goods discovered on the site per the Tribe(s) customs and traditions and the City’s mitigation measures/conditions of approval. The Tribal Monitor will have the authority to stop and redirect grading in the immediate area of a find in order to evaluate the find and determine the appropriate next steps, in consultation with the Project archaeologist.
If changes are made to the project footprint to include earth-moving activities in areas not previously studied, additional archaeological investigations shall be required.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
In the event that archaeological materials are discovered during construction, all earth-moving activity within and around the immediate discovery area shall be diverted until a qualified archaeologist can assess the nature and significance of the find, and, if necessary, develop appropriate treatment measures. Treatment measures typically include development of avoidance strategies, capping with fill material, or mitigation of impacts through data recovery programs such as excavation or detailed documentation. If during cultural resources monitoring the qualified archaeologist determines that the sediments being excavated are previously disturbed or unlikely to contain significant cultural materials, the qualified archaeologist can specify that monitoring be reduced or eliminated.
Native American monitors from affected Tribes shall observe all project-related grading activities, and the treatment of any recovered artifacts shall be carried out in accordance with the provisions of a Treatment Agreement between affected Tribes. The Treatment Agreement shall be executed by the consulting Tribes prior to the issuance of grading permits for each construction phase. All cultural materials that are collected during the grading monitoring program and from any previous archaeological studies or excavations on the project site shall be curated according to the current professional repository standards. The collections and associated records shall be transferred, including title, to an appropriate curation facility which meets the standards set forth in 36 CFR Part 79 for federal repositories. All sacred sites, should they be encountered within the project area, shall be avoided and preserved as the preferred mitigation.
If changes are made to the project footprint to include earth-moving activities in areas not previously studied, additional archaeological investigations shall be required.
CR-2 Archaeological Monitoring. At least 30-days prior to application for a grading permit and before any grading, excavation and/or ground disturbing activities on the site take place, the Project Applicant shall retain a Secretary of Interior Standards qualified and RPA-certified archaeological monitor to monitor all ground-disturbing activities in an effort to identify any unknown archaeological resources/TCRs and assist with avoidance, preservation and/or mitigation per the City's Mitigation Measures on known resources.
The Project Archaeologist in consultation with the Monitoring Tribe(s), the Developer and the City, shall develop a Cultural Resources Monitoring Plan (CRMP) to address the details, timing and responsibility of all archaeological and cultural activities that will occur on the project site. Details in the Plan shall include:
a. Project grading and development scheduling;
b. The Project archeologist and the Monitoring Tribe(s) shall attend the pre-grading meeting with the construction manager and any contractors and will conduct a mandatory Cultural Resources Worker Sensitivity Training to those in attendance. The Training will include a brief review of the cultural sensitivity of the Project and the surrounding area: what resources could potentially be identified during earthmoving activities; the requirements of the monitoring program: the protocols that apply in the event inadvertent discoveries of cultural resources are identified, including who to contact and appropriate avoidance measures until the find(s) can be properly evaluated; and any other appropriate protocols. All new construction personnel that begin work on the Project following the initial Training must take the Cultural Sensitivity Training prior to beginning work and the Project archaeologist and Monitoring Tribe(s) shall make themselves available to provide the training on an as-needed basis.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
c. The coordination of a monitoring schedule as agreed upon by the Monitoring Tribe(s), the Project archaeologist and the applicant;
d. The protocols and stipulations that the Developer. City, Monitoring Tribe(s) and Project archaeologist will follow in the event of inadvertent cultural resources discoveries, including any newly discovered cultural resource deposits that shall be subject to a cultural resources evaluation.
Prior to issuance of any grading permit, the Applicant shall retain a qualified vertebrate [sic] to develop a paleontological resource impact mitigation program (PRIMP) for excavations into the Upper Cretaceous Ladd Canyon Formation [sic], the Upper Cretaceous Williams Formation, ; and the Paleocene Silverado Formation. A qualified vertebrate paleontologist is defined as a paleontologist meeting the criteria established by the Society of Vertebrate Paleontology. The qualified vertebrate paleontologist shall conduct a preconstruction field assessment to locate fossils at surface exposures.
The qualified vertebrate paleontologist shall supervise a paleontological monitor who shall be present at such times as required by the paleontologist during construction excavations into the fossiliferous formations referenced above. Monitoring shall consist of visually inspecting fresh exposures of rock for larger fossil remains and, where appropriate, collecting wet or dry screened sediment samples of promising horizons for smaller fossil remains. The frequency of monitoring shall be determined by the paleontologist and shall be based on the rate of excavation and grading activities, the materials being excavated, and the depth of excavation, and if found, the abundance and type of fossils encountered. If resources are located, monitoring hours shall be increased if needed.
CR-3 Treatment and Disposition of Tribal Cultural Resources. In the event that Tribal Cultural Resources (TCRs) are inadvertently discovered during the course of grading for this Project and avoidance of the TCRs is not feasible, the following procedures will be carried out for treatment and disposition of the discoveries:
1. Temporary Curation and Storage: During the course of construction. All discovered resources shall be temporarily curated in a secure location onsite or at the offices of the project archaeologist. The removal of any artifacts from the project site will need to be thoroughly inventoried with tribal monitor oversight of the process; and
2. Treatment and Final Disposition: The landowner(s) shall relinquish ownership of all cultural resources, including all archaeological artifacts and non-human remains as part of the required mitigation for impacts to tribal cultural resources. Human remains, sacred/ceremonial items and burial good will be addressed per State Law. Mitigation Measure CR-1 and the Agreement required in Mitigation Measure CR-1. The applicant shall relinquish the artifacts as indicated below and provide the City of Corona Planning Division with evidence of same:
a. Professional curation, including a curation agreement with a qualified repository in Riverside County that meets federal standards per 36 CFR Part 79, and which shall be made available to all qualified researchers upon application. The collections and associated records shall be transferred, including title, to an appropriate curation facility within Riverside County, to be accompanied by payment of the fees necessary for permanent curation; b. At the completion of grading, excavation and ground disturbing activities on the site, a Phase IV Monitoring Report shall be submitted to the City Planning Division documenting monitoring activities conducted by the project Archaeologist and Native Tribal Monitors within 60 days of completion of grading. This report shall document the impacts to the
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
known resources on the property; describe how each mitigation measure was fulfilled; document the type of cultural resources recovered and the disposition of such resources; provide evidence of the required cultural sensitivity training for the construction staff held during the required pregrade meeting; and, in a confidential appendix, include the daily/weekly monitoring notes from the archaeologist. All reports produced will be submitted to the City of Corona, Eastern Information Center and Monitoring Tribe(s).
If a potential fossil is found, the qualified vertebrate paleontologist or paleontological monitor shall be allowed to temporarily divert or redirect grading and excavation activities in the area of the exposed fossil, as determined appropriate by the monitor, to assess the significance of the find and, if necessary, develop appropriate treatment measures. Treatment measures may include avoidance or preservation in place, if feasible. If preservation or avoidance of the resource is not feasible, then the resource shall be removed from its location. Removal activities may consist of the relatively rapid removal of small isolated fossils from an active cut, to hand-quarrying of larger fossils from a bone bed over several days. These activities may include the assistance of the grading and excavation contractor’s equipment to facilitate removal. Any fossils encountered and recovered shall be prepared to the point of identification and catalogued before they are donated to their final repository. Any fossils collected shall be donated to a public, non-profit institution with a research interest in the materials, such as the Natural History Museum of Los Angeles County, San Bernardino County Museum, the John D. Cooper Archaeological and Paleontological Curation Center at the California Sate University, Fullerton, or Western Science Center in Hemet, California. Accompanying notes, maps, and photographs shall also be filed at the repository.
CR-4 Sacred Sites. All sacred sites, should they be encountered within the project area, shall be avoided and preserved as the preferred mitigation, if feasible. Prior to the release of the grading bond, the paleontologist shall prepare a report summarizing the results of the monitoring and salvaging efforts, the methodology used in these efforts, as well as a description of the fossils collected and their significance. The report shall be submitted by the Applicant to the Community Development Director or his/her designee for approval. In addition, the report shall be submitted to at least one of the repositories mentioned in Mitigation Measure CR-3 and other appropriate or concerned agencies to signify the satisfactory completion of the project and required mitigation measures.
CR-5 Discovery of Human Remains. In the event that human remains (or remains that may be human) are discovered at the project site during grading or earthmoving. the construction contractors, project archaeologist, and/or designated Native American Monitor shall immediately stop all activities within 100 feet of the find. The project applicant shall then inform the Riverside County Coroner and the City of Corona Planning Division immediately, and the coroner shall be permitted to examine the remains as required by California Health and Safety Code Section 7050.5(b). Section 7050.5 requires that excavation be stopped in the vicinity of discovered human remains until the coroner has made the necessary findings as to origin If human remains are determined to be Native American,, the applicant shall comply with the state law relating to the disposition of Native American burials that fall within the jurisdiction of the NARC (PRC Section 5097). The coroner shall contact the NAHC within 24 hours and the NAHC will make the determination of most likely descendant(s). The MLD shall complete his or her inspection and make recommendations or preferences for treatment within 48 hours of being granted access to the site. Treatment and disposition of the remains shall be determined in consultation with the most likely descendant(s) to determine the most appropriate disposition of human remains and any associated grave artifacts. In the event that the applicant and the MLD are in disagreement regarding the disposition of the remains. State law will apply and the mediation process will occur with the NAHC. if requested (see PRC Section 5097.98(e) and 5097.94(k)).
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
The specific locations of Native American burials and reburials are confidential and may not be disclosed to the general public. The locations will be documented by the consulting archaeologist in conjunction with the various stakeholders and a report of findings will be filed with the Eastern Information Center (EIC). A Sacred Lands File form will be submitted to the NAHC by the project archaeologist and the Monitoring Tribe(s).
According to the California Health and Safety Code, six or more human burials at one location constitutes a cemetery (Section 8100), and disturbance of Native American cemeteries is a felony (Section 7052).
CR-6 Prior to issuance of any grading permit, the Applicant shall retain a qualified vertebrate paleontologist [sic] to develop a paleontological resource impact mitigation program (PRIMP) for excavations into the Upper Cretaceous Ladd Canyon Formation [sic], the Upper Cretaceous Williams and Ladd Formations (undifferentiated), the Early Pleistocene Very Old Alluvial Fan Deposits; the Upper Cretaceous Ladd Formation/Baker Canyon Conglomerate member; and Paleocene Silverado Formation. A qualified vertebrate paleontologist is defined as a paleontologist meeting the criteria established by the Society for Vertebrate Paleontology. The qualified vertebrate paleontologist shall conduct a pre-construction field assessment to locate fossils at surface exposures. The qualified vertebrate paleontologist shall supervise a paleontological monitor who shall be present at such times as required by the paleontologist during construction excavations into the fossiliferous formations mentioned above. Monitoring shall consist of visually inspecting fresh exposures of rock for larger fossil remains and, where appropriate, collecting wet or dry screened sediment samples of promising horizons for smaller fossil remains. The frequency of monitoring shall be determined by the paleontologist and shall be based on the rate of excavation and grading activities, the materials being excavated, and the depth of excavation, and if found, the abundance and type of fossils encountered. If resources are located, monitoring hours shall be increased as needed.
CR-7 If a potential fossil is found, the qualified vertebrate paleontologist or paleontological monitor shall be allowed to temporarily divert or redirect grading and excavation activities in the area of the exposed fossil, as determined appropriate by the monitor, to assess the significance of the find and, if necessary, develop appropriate treatment measures. Treatment measures may include avoidance or preservation in place, if feasible. If preservation or avoidance of the resource is not feasible, then the resource shall be removed from its location. Removal activities may consist of the relatively rapid removal of small isolated fossils from an active cut, to hand-quarrying of larger fossils over several hours, to excavations of large fossils or large numbers of smaller fossils from a bone bed over several days. These activities may include the assistance of the grading and excavation contractor’s equipment to facilitate removal. Any fossils encountered and recovered shall be prepared to the point of identification and catalogued before they are donated to their final repository. Any fossils collected shall be donated to a public, non-profit institution with a research interest in the materials, such as the Natural History Museum of Los Angeles County, San Bernardino County Museum, the John D. Cooper Archaeological and Paleontological Curation Center at the California State University, Fullerton, or Western Science Center in Hemet, California. Accompanying notes, maps, and photographs shall also be filed at the repository.
CR-8 Prior to the release of the grading bond, the paleontologist shall prepare a report summarizing the results of the monitoring and salvaging efforts, the methodology used in these efforts, as well as a description of the fossils collected and their significance. The report shall be submitted by the Applicant to the Community DevelopmentPlanning Director or his/her designee for approval. In addition, the report shall be submitted to at least one of the repositories mentioned in Mitigation
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
Measure CR-7 and other appropriate or concerned agencies to signify the satisfactory completion of the project and required mitigation measures.
Geology and Soils
GEO-1 Site Preparation and Removals. All grading shall be accomplished under the observation and testing of the Project Geotechnical Engineer and Engineering Geologist in accordance with the recommendations contained in the Project Geotechnical Report, contained in Appendix F of this Draft EIR), the current codes practiced by the City of Corona and the Earthwork Specifications contained in Appendix IV of the Project Geotechnical Report.
Loose, compressible residual soil, non-engineered onsite fill, colluvium, alluvium, landslide debris, older alluvium and weathered bedrock shall be removed from fill areas prior to placement of fill and shall be removed from shallow cut areas, where exposed at finish grades. Guidelines to determine the depth of removals are presented below; however, the exact extent of the removals must be determined in the field during grading, when observation and evaluation of the greater detail afforded by those exposures can be performed by the Geotechnical engineer and/or Engineering Geologist.
The minimum backcut ratio shall be 1:1 (horizontal to vertical). The bottoms of all removal areas shall be observed, mapped and approved by the Engineering Geologist prior to fill placement. It is recommended that the bottoms of removals be surveyed and documented by the Project Civil Engineer.
Groundwater, if encountered during grading, shall be evaluated by the Geotechnical Engineer and/or Engineering Geologist. In general, groundwater is not anticipated to adversely affect grading although saturated soils and free water may be encountered along canyons and within alluvium removals. If groundwater is excessive, remedial measures such as horizontal drains or under drains may need to be installed. Further, settlement monuments and plates (see Plate VI of the Geotechnical Report) shall be installed during and after completion of grading to monitor settlement monuments and plates shall be used to determine when the majority of the primary settlement has been completed to allow for the release of affected lots for construction. • Stripping: Vegetation, debris and other deleterious materials are unsuitable as structural fill material and shall be disposed of offsite prior to commencing removals and placement of compacted fills. The thick, natural vegetative growth onsite is significant and will require consideration for removal. An onsite mulching operation may be considered. The mulched materials could then be used in future landscape areas. • Soil and Weathered Bedrock (unmapped): Loose, compressible onsite soils and underlying weathered bedrock shall be removed to expose the underlying competent bedrock materials prior to placement of compacted fill and when exposed in shallow cut area. An average removal depth of 5 feet is anticipated for removal of topsoil and weathered bedrock. In general, onsite soils and weathered bedrock are suitable to be re-used as structural fill when properly moisture-conditioned.
• Undocumented Artificial Fill (locally mapped as AFu): Fills associated with "recreational" grading, construction of unpaved access roads, mining operations and existing trench backfill shall be removed prior to fill placement. Generally, these artificial fills range from a depth of 3 to 20 feet. Local areas of undocumented fill associated with previous geotechnical investigations are not plotted on the map. Other fills, including roadway fills and trench backfill, are not mapped due to their localized extent and minor thickness.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
Removals shall extend below the undocumented fill until competent materials are encountered.
• Alluvium/Colluvium (map symbol Qal): All alluvium deposits exposed at existing or cut grades shall be entirely removed prior to fill placement. These deposits range in thickness from approximately 5 feet to 35 feet. Ginter and Associates recommends that all alluvial and colluvial soils below proposed fill areas and in cut areas be removed to expose competent bedrock or terrace deposits. Anticipated average removal depths for alluvium/colluvium areas are expected to vary to an estimated maximum thickness of 35 feet.
• Groundwater was not encountered during PSE's subsurface investigation within the alluvium onsite. However, access was limited and certain alluvial areas could not be investigated such as within Krooner Canyon. If "saturated" alluvium is encountered that possesses a degree of saturation of 85% of more and is consistent with depth to bedrock, consideration may be given to leaving the saturated alluvium in-place, provided that settlement time-delay consequences are acceptable to the owner. If saturated alluvium is encountered and is going to remain in-place, an additional liquefaction investigation may be required and dynamic settlement recommendations for those areas will likely change. • Older Alluvium (Qoa): All older alluvium shall be removed to expose the underlying competent bedrock. Generally, these deposits range in depth from 10 to about 20 feet. • Landslide Debris (Qls): All landslide debris that could adversely affect the proposed development shall be removed to expose the underlying competent bedrock. Generally, these deposits range in depth from 10 to about 29 feet, but may range up to around 35 feet in depth.
• Removals Along Grading Limits: Removals of unsuitable soils shall be required prior to fill placement along the grading limit. A 1:1 projection, from toe of slope or grading limit, outward to competent materials shall be established, when possible. Where removals are not possible due to grading limits, property line or easement restrictions, removals shall be initiated at the grading boundary (property line easement, grading limit or outside the improvement) at a 1:1 ratio inward to competent materials. Where this reduced removal criterion is implemented, special maintenance zones may be necessary. Affected areas shall be established, minimally, as a 1:1 projection from suitable removal bottom to finish ground surface. This condition is mainly expected in the slope areas. Where the projection intersects the face of the slope, the potential for distortion of the slope in response to postgrading settlements exists and provisions for future maintenance of such slopes shall be provided.
GEO-2 Slope Stability and Remediation
• Cut Slopes: The majority of cut slopes have been designed at a slope ratio of 2:1. The Engineering Geologist shall observe cut slopes and cut slope stabilization backcuts during grading. Modifications to the recommendations presented herein will likely be required based upon conditions exposed by grading.
• Williams Formation (KW): Cut slopes within the Williams Formation may expose adverse bedding that shall require remediation. The cut slope superjacent to Lots 278 and 279 is anticipated to require replacement with a buttress fill. Probable buttresses are anticipated
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
for the cut slope above Lots 261 through 267 and the cut slope below the WQMP Basin and Lots 247 through 255, as depicted on Figure 1 and Figure 2 (pocket) of the Geotechnical Report.
• Ladd Formation: Cut slopes within the Ladd Formation may expose adverse bedding that shall require remediation. The majority of the cut slopes should expose bedding dipping into the slope or at an angle steeper than the proposed cut slopes (greater than 60 degrees).
Cut slopes within the Ladd Formation that expose bedding dipping into the slope or at an angle steeper than the proposed cut slopes are expected to be grossly stable; however, the final determination shall be made based on exposed conditions during grading. Cut slopes within the Ladd Formation may expose conglomerate resulting in poorly cemented sands, cobbles and boulders at finish grade, producing a rough uneven surface. These cut slopes shall be evaluated in the field by the Project Engineering Geologist or Geotechnical Engineer.
Replacement of those slopes with compacted stabilization fills may be required. Future exploration and in-grading observation could reveal more favorable geology in these specific areas.
• Alluvium/Colluvium: Cut slopes exposing alluvial/colluvial soils (Qal) shall require replacement with a drained stabilization fill. Typically, such corrective grading would be constructed with a minimum key width corresponding to one-half the full height of the superjacent slope, but not less than 15 feet. Minimum key depths at the toe shall be 2 feet.
All stabilization fills shall be provided with a backdrain and outlet system as detailed in Appendix IV of the Geotechnical Report.
• Silverado Formation: Cut slopes within the Silverado Formation are expected to be grossly stable; however the final determination shall be made based on exposed conditions during grading. Cut slopes within the Silverado Formation may expose poorly cemented sands, cobbles and boulders at finish grade, which would produce a rough uneven surface. These cut slopes shall be evaluated in the field by the Project Engineering Geologist or Geotechnical Engineer. Replacement of those slopes with compacted stabilization fills may be required.
• Fill Slopes: The majority of fill slopes on the project are designed at a maximum slope ratio of 2:1. The highest fill slope is approximately 160 feet in height and located subjacent to Lot
68. Based on the results of the calculations, the 2:1 fill slopes 160 feet and less in height, when properly constructed with onsite materials, are expected to be grossly stable, as designed. Keys shall be constructed at the toe of all fill slopes where unsuitable soil removals do not accomplish a minimum key width of one-half the slope height plus bench widths or twenty (20) feet, whichever is greater. Minimum key depths at the toe shall be 2 feet. Due to grading limit restrictions, removals of unsuitable soils beyond the proposed toe may be limited; therefore, additional slope maintenance shall be expected in the areas where a 1:1 projection into approved materials cannot be achieved.
GEO-3 Subsurface Drainage. Canyon subdrains are proposed as depicted on Figures 1 through 7 of the Geotechnical Report and shall consist of 6-inch and 8-inch diameter pipes and shall be constructed in accordance with the details shown in Appendix IV of the Geotechnical Report. Final determination of drain locations shall be made in the field. Outletting of subdrain systems shall require coordination with the Project Civil Engineer in determining suitable facilities to accept to drain water.
GEO-4 Overexcavation. Where a transition of cut and fill occurs across a finished lot, it shall be necessary to overexcavate the bedrock portions and replace it with compacted fill. The depth of bedrock
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
overecavation shall be equal to 1/3 the maximum fill depth (after removals) on the fill side of the transition. Anticipated transition lots are shown on figures 1-7 of the geotechnical report. Cut pads shall be overexcavated a minimum of 5 feet to provide a uniform foundation material. Some highly expansive soils of the silverado formation may be encountered at grade in some areas. Consideration shall be given to increasing the overexcavation depth to mitigate for highly expansive soils, if warranted. Difficult excavation with a backhoe can be expected in some street areas. Ginter & associates recommends street overexcavation and replacement with compacted fill to facilitate utility emplacement in these street areas and driveways. Depths of overexcavation shall extend one (1) foot below the deepest utility line.
GEO-5 Fill Materials. Excavated on-site soils may be used as compacted fill. The fill materials to be used as compacted engineered fill shall be free of organics, debris, deleterious materials, and rocks over 6 inches maximum dimension, and must be approved by the project geotechnical engineer or project geologist prior to use. Import soils, if required, shall be evaluated by the project geotechnical engineer for suitability prior to delivery. Import soils shall be free of trash, debris or other objectionable materials. All import fill shall have engineering characteristics similar to the on-site soils.
GEO-6 Fill Placement, Moisture Conditioning, And Compaction. After approval of the over-excavation and prior to placement of any compacted engineered fill materials, the exposed removal bottoms shall be scarified to a minimum depth of six (6) inches. The area shall then be moisture conditioned approximately 1 to 2 percentage points above the optimum moisture content, and compacted to a minimum of 90 (or 93) percent of the applicable maximum density. The planned development will involve deep fills in the canyon areas and side-hill fill slopes. In order to reduce the amount of fill settlement, the fill shall be compacted to the minimum relative compaction shown below:
Fill Depth (Feet) Minimum Relative Compaction (ASTM: D1557) (%) 0 – 50 90
Below 50 93
Fill slopes shall also be constructed at the minimum relative compactions shown above, with the exception of the outer 3 feet of the slope face which can be placed at 90% relative compaction. Deep fill areas requiring 93% relative compaction are delineated in Plate VI of the Geotechnical Report.
Generation of oversized rock (over 8 inches in maximum dimension) from excavations in the bedrocks is anticipated. Oversize rock shall be placed in single file windrows not exceeding three feet in height and six (6) feet in width with a minimum equipment width (15 feet) separating each windrow or a rock blanket fill not exceeding two (2) to three (3) feet in height. Large erratic rocks shall be buried individually. Granular fill shall be thoroughly flooded in the rock voids and covered with a minimum two feet compacted fill blanket. Successive windrows shall be staggered and none shall be placed within 10 feet of finished grade or closer than 15 feet to compacted fill slope surfaces. Typical rock placement construction detail is provided in Appendix IV of the Geotechnical Report. Placement of rock windrows shall be performed under the observation and recommendations of the Project Geotechnical Engineer.
Fill materials shall be spread in thin lifts, moisture conditioned to about 1 to 2 percentage points over optimum moisture content and compacted to a minimum of 90 (or 93) percent of the laboratory maximum dry density as determined in accordance with ASTM Test Method D-1557. Each lift shall be treated in a like manner until the desired finished grades are achieved. The grading contractor shall have suitable and sufficient compaction equipment in operation to achieve the required
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
compaction. When necessary, earthmoving equipment may be utilized for compaction or temporarily halted in order to permit adequate compaction of fills.
GEO-7 Slope Construction
1. Care shall be taken during grading to prevent spillage of loose materials over slopes to remain natural. Should loose soil be spilled onto natural slopes by the grading contractor, removal of the loose fill shall be required.
2. Fill shall be properly benched into firm bedrock or compacted fill as directed by the Project Engineering Geologist and/or Geotechnical Engineer during grading. Typical benching shall include 4-foot verticals exposing approved, competent material (see Appendix D – Typical Benching Detail of the Geotechnical Report).
3. In order to minimize surficial slumps on compacted fill slopes, the following grading procedures shall be used:
a) Where possible, fill slopes shall be constructed by overfilling a minimum of three (3) horizontal feet and then trimming back to expose the dense inner core of the slope surface. Compacted fill slopes shall be back-rolled during construction at intervals not exceeding four (4) vertical feet. Care shall be taken to construct the slope in a workmanlike manner so that it is positioned at its designed orientation and slope ratio. Achieving a uniform slope surface by subsequent thin wedge filling must be avoided. Any add-on correction to a fill slope shall be done by overfilling the affected area in horizontal, compacted lifts which must be benched into the existing fill prism. The overfilled slope may then be trimmed to the design gradient. b) Where fill slopes are planned above natural slopes and cannot be overfilled and trimmed back, the slopes shall be rolled for the entire height of the slope with a sheepsfoot roller and then finished with a grid roller. If the desired compaction is not obtained in this manner, a vibratory sheepsfoot roller may be required. To be most effective, this equipment shall be anchored and manipulated from a sideboom tractor. In lieu of a grid roller, the slope may be track rolled with a John Deere 450, Caterpillar D-8 dozer or equivalent. To obtain the required compaction and appearance of the slope face, the soil moisture shall be maintained at above optimum from the time of mass filling to the completion of grid rolling. c) The grading contractor shall take proper care to avoid spillage of loose material down the face of the slopes during grading and during drainage terrace and downdrain construction. Fine grading operations for benches and down-drains shall not deposit loose trimmed soils on the finished slope surfaces. Loose soil materials shall require removal.
d) Seeding and planting of slopes shall proceed as rapidly as possible to achieve a well-established and deep-rooted vegetal cover requiring minimal watering. The type of vegetation and watering schedule shall be established by a landscape architect familiar with hillside maintenance.
GEO-8 Earthwork Observations And Testing
a) The site preparation, over-excavation, and earthwork shall be performed under the observation and testing by a representative of the Project Geotechnical Engineer or Project Geologist.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
b) The fill shall be tested at the time of placement to verify that the required compaction is achieved.
c) The fill compaction shall be determined in the field by the Sand Cone Method (ASTM: D 1556) or Nuclear Gauge Method (ASTM: D 2216), or other test method approved by the Project Geotechnical Engineer.
d) During grading, an adequate number of field density tests shall be performed using approved test procedures in order to determine compliance of earthwork to the project requirements. The frequency of field density testing shall be in accordance with the recommendations of the Project Geotechnical Engineer.
e) Quality control testing performed to determine the acceptability of the fill compaction shall be based on the laboratory maximum dry density and optimum moisture content determined in accordance with ASTM: D 1557 test procedure. f) Any surface or subsurface obstructions, or questionable materials encountered during grading shall be brought immediately to the attention of the Project Geotechnical Engineer.
Deeper excavations may be required, should unsuitable soils be encountered locally, as determined by the Project Geotechnical Engineer and/or Project Geologist.
GEO-9 Deep Fill Settlement Monitoring. In deep fill areas, settlement monuments shall be installed and periodically surveyed by the project civil engineer to evaluate the magnitude and progress of settlements. Ginter & associates proposes positioning settlement monuments at strategic locations in the deeper fill areas as shown on figure vi of the geotechnical report. These shall be monitored on a regular basis until the primary settlement has stabilized before those areas released for construction.
GEO-10 Foundation Design. The compacted engineered fill at the project site is anticipated to be low to medium soil expansion potential. Presented below are preliminary geotechnical criteria for design of building foundations, based on medium soil expansion potential for the on-site soils:
Option 1 - Conventional Footing:
Allowable Bearing Pressure (1) = 1,500 pounds per square foot (psf) Minimum Footing Depth (2) = 24 inches
Minimum Footing Width = Continuous: 12 inches
Isolated: 24 inches
Passive Soil Pressure (3) = 250 psf/ft.
Friction Coefficient = 0.30 (ultimate)
Minimum Footing Reinforcement = Four No. 4 bars, 2 each at top and bottom Garage Door Grade Beam = 18 inches deep, Four No. 4 bars, Two each at top and bottom, tied into foundation elements
1. The above value may be increased 250 psf for each additional foot exceeding the minimum embedment depth and/or width, subject to a maximum of 2,500 psf. Allowable bearing pressures may be increased by one-third for short term loading due to wind or seismic forces.
2. Footing depth is from lowest adjacent finished soil grade. Footings shall be deepened, as necessary, to provide setback distance from adjacent slope in conformance with CBC criteria.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
3. Value applies to level soil condition, and is subject to a maximum of 2000 psf.
Option 2 – Post-Tensioned Foundation:
If post-tensioned slab/footing system is selected for the subject project, the design may be based on the geotechnical criteria shown below for medium soil expansion potential. These are based on the guidelines presented in the PTI, Third Edition design manual.
Thornthwaite Moisture Index = -20
Equilibrium Suction = 3.6
Edge Lift Moisture Variation Distance, em = 5.1 feet
Edge Lift, ym = 1.1 inches
Center Lift Moisture Variation Distance, em = 9.0 feet
Center Lift, ym = 0.47 inches
Minimum Footing Depth (Exterior) = 18 inches below adjacent grade The above foundation criteria are based on medium soil expansion consideration only. Foundation design shall consider anticipated post-construction settlements, as appropriate. Foundation design details such as slab thickness, concrete strength, reinforcements, etc. shall be established by the Project Structural Engineer considering medium soil expansion and settlement potential provided below.
GEO-11 Foundation Settlement. Total static and differential post-construction settlements for footings designed and constructed in accordance with the criteria given below and supporting loads not exceeding the typical loadings for residential construction (column and wall loads on the order of 30 kips and 3 kips/lineal foot, respectively) are not anticipated to exceed the values shown below. The settlement estimates shall be confirmed based on review of the foundation plans. Structures shall be designed for the following post-construction settlements:
- Total settlement = 1 inch
- Differential settlement = ¾-inch (*)
(*) Between similarly loaded column footings and for continuous footings and slabs over a distance of approximately 30 feet.
General Remarks:
i. Footing depths shall not be allowed to be affected adversely, such as through erosion softening, digging, landscaping, etc.
ii. Where foundations encroach closer than five (5) feet horizontally from the flow line of drainage swales, the footing shall be deepened sufficiently to maintain the required embedment depth below the adjacent flow line.
iii. Foundation details such as concrete strength, reinforcements, etc. shall be established by the Project Structural Engineer, considering the loading and medium soil expansion potential. The footing and slab reinforcements recommended in the Geotechnical Report are minimum requirements. More restrictive criteria based on structural design considerations or Code requirements shall govern.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
iv. Foundation excavations shall be observed and approved by the Project Geotechnical Engineer prior to the placement of reinforcement or concrete. Forming of footing excavations may be required. Excavations shall be free of slough and debris and thoroughly moisture conditioned prior to placing concrete.
v. Excavated material from footing and utility trenches shall not be placed in slab-on-grade areas unless properly compacted and tested.
GEO-12 Slab-On-Grade.
Recommended Minimum Criteria For Slab-On-Grade Are Shown Below:
Concrete Floor Slabs: Concrete floor slabs shall be 5 inches thick (minimum) and shall be reinforced with No. 3 bars at 18 inches on center, each way at mid height. No. 3 bars at 18 inches on center shall be provided connecting floor slabs to footings. In order to minimize migration of moisture up the concrete slab from soil subgrade and damage to floor coverings, a moisture barrier/water vapor retarder is recommended beneath floor slabs as discussed hereinafter.
Moisture/Water Vapor Retarder for Concrete Slab-on-Grade: In order to reduce the potential for moisture/water vapor migration up through the slab and possibly affecting floor covering, a moisture/vapor retarder is recommended under concrete floor slab-on-grade. The moisture barrier shall be properly installed, lapped and sealed in accordance with the manufacturer’s specifications.
Punctures and rips shall be repaired prior to placement of sand. At a minimum, this moisture/water vapor retarder shall consist of 10- millimeter thick polyethylene (“Visqueen”), lapped and sealed, and placed mid-height within a 4-inch coarse sand layer. This moisture/water vapor retarder shall be installed in accordance with manufacturer’s specifications. The following recommendations are based on the tentative guidelines by the American Concrete Institute (ACI, April 2001) to reduce the potential moisture/water vapor intrusion in concrete slab-on-grade. Based on Ginter & Associates’ review of available literature, it appears that the ACI procedure would be more effective to help reduce potential moisture/water vapor migration up through concrete slab-on-grade.
Recommendations based on the ACI guidelines are presented below:
• The moisture/water vapor retarder shall consist of high strength polyethylene membrane and shall meet or exceed the ASTM: E-1745-97 Class C material requirements for water vapor permeance, tensile strength and puncture resistance. The vapor retarder shall consist of “Moistop Plus” (Fortifiber Building Products Systems) or “Vapor Block” VB 15 (Americover, Inc.), or approved equal. The vapor retarder shall be underlain by a capillary break comprised of minimum 4 inches thick pea gravel layer. The gravel layershall be placed and compacted on approved soil sub-grade.
• The membrane shall be placed on approved gravel layer and properly lapped and sealed.
Membranes intersecting utility pipes, sewer lines, ducts or drains shall be properly wrapped around the penetrations and sealed. All punctures and rips in the membrane shall be repaired prior to placement of concrete, following manufacturer’s recommendations. The vapor retarder shall be installed in general accordance with the procedures outlined in ASTM: E-1643, and in conformance with the installation procedures recommended by the manufacturer.
• To minimize slab curling, a low slump concrete (low shrinkage mix design) shall be used for the slab construction, as determined by the Project Structural Engineer.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
The moisture/water vapor protection for concrete slab-on-grade shall be selected based on cost and construction considerations, and considering potential future problems resulting from improper and uncontrolled landscape irrigation practices. Regardless of the moisture/water vapor retarder option selected, it should be emphasized that proper control of irrigation and landscape water adjacent to the structure is of paramount importance.
GEO-13 Driveways. Driveway concrete slabs shall be 5 inches thick (minimum) with no. 3 bars at 18 inches on center, each way at mid-height. The slab may be placed directly on properly prepared sub-grade.
No moisture barrier is required under driveway slabs.
GEO-14 Exterior Flatwork. Exterior concrete flatwork (e.g. Sidewalks, walkways) shall be 4 inches thick (minimum), with no. 3 bars at 24 inches on center, each way at mid-height and placed on properly prepared sub-grade. Hardscape areas within two feet of the descending slopes shall include a thickened edge deepened to provide a minimum five (5) feet horizontal setback between the bottom outside face of the thickened edge and slope face.
GEO-15 Sub-Grade Pre-Saturation. Prior to concrete placement, the soil sub-grade shall be thoroughly wetted to about 12 inches in depth at a moisture condition of about 2 to 3 percentage points above the optimum moisture content.
GEO-16 General. Interior floor slabs and exterior concrete flatwork, including driveway, shall be properly designed for the construction and service loading conditions, potential settlements and soil expansion. The structural details, such as slab thickness, concrete strength, reinforcing criteria, joint spacing, etc. Shall be established by the project structural engineer. The recommended minimum reinforcements for concrete slabs provided above are intended for preliminary design only. More restrictive criteria as dictated by structural design or regulatory requirements shall govern.
GEO-17 Retaining Walls
• Foundations: Retaining wall foundations may be supported on either compacted engineered fill or competent bedrock. If a bedrock/fill transition is encountered, the bedrock portion shall be overexcavated minimum 2 feet and replaced with approved compacted fill. Alternatively, a cold joint shall be constructed in both the footing and the wall. Footings may be designed in accordance with the foundation design criteria presented in the Geotechnical Report when embedded at least two feet below lowest adjacent grade.
Footings located on or at top of slopes shall be deepened, as necessary, to provide minimum lateral setback between footing and slope faces in accordance with CBC requirements. • Lateral Earth Pressures: The earth pressures acting on retaining walls depend primarily on allowable wall movement, type of backfill materials, backfill slopes, wall inclination, surcharges, and any hydrostatic pressure. The following lateral earth pressures are recommended for vertical walls with no hydrostatic pressure and no surcharge loading:
Wall Condition Backfill Type Lateral Earth Pressure (Equivalent Fluid Pressure) (pcf)
Level 2:1 (H:V)
Active (Cantilever) Sandy Soils 40 65
The surcharge effect of anticipated loads on the wall backfill (i.e. traffic, construction equipment, footings, etc.) shall be included in the wall design. If the wall is free to deflect, 33 percent of the maximum surcharge load located within a distance equal to the height of wall shall be used in the design.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
• Backfill: Retaining wall backfill shall consist of predominantly granular non-expansive soils.
The backfill shall extend within a 45-degree plane from the wall footing. Retaining wall backfill shall be mechanically compacted to minimum 90 percent of the applicable laboratory maximum density and performed under the observation and testing of the Project Geotechnical Engineer. No jetting, ponding, or flooding shall be permitted. No backfill shall be placed against concrete until minimum design strengths are attained. • Backfill Drainage: The wall design shall include waterproofing and weep holes or sub-drains or backdrains, as appropriate, for relieving possible hydrostatic pressures. If on-site soils are utilized for wall backfill, the design shall include a prefabricated drainage blanket (such as Miradrain 2000, or equivalent). At a minimum, sub-drains shall consist of 4-inch diameter, perforated Schedule 40, PVC pipe or equivalent, embedded in approximately 3 cubic feet per lineal foot of ¾-inch (maximum) rock, or approved alternate. This permeable material shall be enveloped in Geofabric consisting of Mirafi 140 or equivalent. The pipe and trench bottom shall be sloped at a gradient of 2+ percent to a suitable discharge outlet. Sub-drains placed behind retaining walls shall be approved by the Project Geotechnical Engineer prior to backfill placement.
GEO-18 Soil Corrosion. The previous geotechnical consultants, Pacific Soils Engineering, Inc., performed preliminary testing and indicated that the site soils are corrosive to metals. Therefore, representative finished grade samples shall be tested for corrosion suites (sulfate, chloride, ph and resistivity) upon completion of grading. It may be necessary to retain a corrosion engineer for consultation.
GEO-19 Utility Trench Backfill
• Bedding material shall consist of on-site sandy or imported materials exhibiting a San Equivalent (S.E.) value of 30 or greater.
• The on-site soils are considered suitable for trench backfill, provided they are free of organic materials and oversize rocks.
• Backfill of all exterior and interior trenches shall be placed in thin lifts not exceeding 4 inches and mechanically compacted to achieve a relative compaction of not less than 90% based on ASTM: D1157. Care shall be taken not to damage utility lines. • Utility trenches shall not be located within the influence of footings. This is defined as a zone located below the footing and a line sloping at an inclination of 1:1 (horizontal to vertical) outward from the outside edge of footings. If utility lines are located within the zone of footings, the backfill shall be compacted to a minimum 95 percent relative compaction or slurry backfilled (minimum 1-1/2 sack cemented sand mix. • To reduce potential water migration into building subgrade through the granular bedding/shading layer and/trench backfill, utility trenches shall be backfilled with the onsite finer grained materials or sand-cement slurry for minimum 3 feet length at their entry points.
• Trenches in fill soils and alluvial deposits greater than 4 feet in depth shall be shored or sloped back as required by the local regulatory agency, the state of California Division of Industrial Safety Construction Safety Orders, and Federal OSHA requirements.
GEO-20 Asphalt Concrete Pavement. Preliminary asphalt concrete pavement sections for the planned streets in the development were developed utilizing the Caltrans method of design and the structural section design guide for California cities and counties. The following recommended pavement
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
sections were computed assuming an “r” value of 30 for site soils compacted as sub-grade material, and assumed traffic indices. The actual “r” value will depend on the soil conditions exposed at the planned street sub-grade elevations. During rough grading, “r” value testing shall be performed on the pavement sub-grade soils to confirm the pavement design basis. Further analysis and evaluation are necessary if the design traffic index and the sub-grade “r” value are different from those used in Ginter & Associates’ analyses.
Traffic Index Recommended Minimum Pavement Section
Asphalt Concrete
(inches)
Aggregate Base
(inches)
Total (inches)
5.0 6.0
7.0 8.0
3.0 4.0
4.0 5.0
6.0 8.0
10.0 12.0
9.0 12.0
14.0 16.0
Aggregate base shall consist of crushed aggregate base (CAB) or crushed miscellaneous base (CMB) and shall comply with the specifications outlined in the “Standard Specifications for Public Works Construction”, (“Green Book”). The base material shall be compacted to minimum 95 percent of the maximum laboratory density, determined in accordance with ASTM: D-1557. The soil sub-grade shall be compacted to minimum 90 percent relative compaction. The subgrade soils shall exhibit a firm and unyielding surface, in addition to the recommended minimum compaction. Final compaction and testing of pavement sub-grade shall be performed just prior to placement of aggregate base.
GEO-21 Site Drainage. All roof and surface drainage shall be directed away from structures and their appurtenances and slopes to approved drainage facilities. Ponding of water shall be avoided. For graded soil areas, a minimum gradient of 2 percent away from structures shall be maintained. The drainage patterns designed by the project civil engineer shall be established at the time of fine grading and maintained throughout the life of the structure or, if altered, shall be replaced with a properly designed area drain system. Irrigation activities at the site shall be monitored and controlled to prevent overwatering. Planter areas adjacent to structures shall be avoided. If utilized, such planters shall include measures to contain irrigation water and prevent moisture migration into walls and under foundations and slabs-on-grade.
GEO-22 Slope Planting, Irrigation And Maintenance. General guidelines for slope planting, irrigation and maintenance are shown below:
a) Slope planting shall consist of appropriate drought resistant vegetation as recommended by the Landscape Architect. Landscaping of slopes shall be completed as soon as possible and properly maintained.
b) The property owner is responsible for proper irrigation and for maintenance and repair of installed irrigation systems. Leaks shall be repaired immediately. Sprinklers shall be adjusted to provide maximum coverage with a minimum of water usage and overlap. Over-watering with consequent excessive runoff and ground saturation shall be avoided. c) If automatic sprinkler systems are installed, their use shall be adjusted to account for natural rainfall conditions.
d) All interceptor ditches, drainage terraces, down-drains, and any other drainage devices that have been installed shall be maintained and cleaned.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
e) If rodent activity is present, the property owner shall undertake a program for the elimination of burrowing animals. This shall be an ongoing program in order to promote slope stability.
f) Water shall not be allowed to flow over the constructed or natural slopes. This may require the construction of berms or ditches along the top of slopes, if such devices are not in place.
GEO-23 Additional Investigation. Additional geologic and geotechnical investigation may be necessary during the 40-scale grading plan review phase to obtain supplemental information relative to the site geologic conditions and engineering properties of onsite materials and to confirm the preliminary recommendations provided herein.
Greenhouse Gas Emissions
GHG-1 Climate Action Plan Compliance. Prior to issuance of building permits, the Project Applicant shall demonstrate that appropriate building construction measures shall apply to achieve a minimum of 100 points per Appendix C to the City of Corona 2019 Climate Action Plan (CAP) Update. The conceptual measures anticipated for the Project are listed in Attachment C of the Project’s Air Quality and Greenhouse Gas Assessment (AQ/GHG Assessment), which is appended to this EIR Addendum as Technical Appendix C. The conceptual measures may be replaced with other measures as listed in the CAP Screening Tables (Appendix C to the CAP Update), as long as they are replaced at the same time with other measures that in total achieve a minimum of 100 points per Appendix C to the City of Corona CAP Update.
Hazards and Hazardous Materials
PS-1 Prior to issuance of building permits, the project Applicant shall obtain CFD review and approval of the site plan, fuel modification plan, and project design features including, but not limited to roadway design to meet or exceed minimum fire and emergency access requirements including ingress/egress; driveway and fire lane width; turning radii inside and outside; grades/elevations; adequate on-site space to park CFD apparatus; fire hydrant sizing, spacing and locations; fire protection systems including automatic fire sprinkler systems and fire alarms installed in each residence; availability of adequate firefighting water flow; and approved building materials. The project Applicant shall implement the fuel modification plan and other CFD-required fire life safety features prior to issuance of a certificate of occupancy.
PS-2 Prior to the issuance of building permits, the project Applicant shall pay the required service and development fees pursuant to the “Fire Facilities Fund” as amended in Chapter 3.36 of the CMC to the City of Corona for the public improvements and facilities associated with the CFD.
Hydrology and Water Quality
HYD-1 For Drainage Management Area C, the final engineering for the drainage of Area C shall include a concrete impact basin energy dissipater and rip-rap pad and shall be designed in accordance with City standards. The outlet velocity shall be at or below the existing condition .. The plans shall be submitted to the City for review and approval.
Land Use and Planning
PDF LU-1 The project applicant will survey and post the location of the private property boundary line where it abuts NFS lands within the project area.
Noise
NS-1 Construction and demolition shall be restricted to the hours of 7:00 A.M. to 8:00 P.M. Monday through Saturday, and 10:00 A.M. to 6:00 P.M. on Sundays and Federal holidays.
NS-2 Noise and groundborne vibration construction activities whose specific location on the project site may be flexible (e.g., operation of compressors and generators, cement mixing, general truck idling) shall be conducted as far as possible from the nearest noise-and vibration-sensitive land uses.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
NS-3 Construction and demolition activities shall be scheduled so as to avoid operating several pieces of equipment simultaneously, which causes high noise levels.
NS-4 The use of construction equipment or construction methods with the greatest peak noise generation potential shall be minimized (i.e., use of drills, jackhammers).
NS-5 The project contractor shall use power construction equipment with state-of-the-art noise shielding and muffling devices.
NS-6 Barriers such as, but not limited to, plywood structures of flexible sound control curtains shall be erected between the proposed project and the adjacent existing residences to the northeast and west, to minimize the amount of noise to the maximum extent feasible during construction.
NS-7 All construction truck traffic shall be restricted to truck routes approved by the City of Corona Public Works Department, which shall avoid residential areas and other sensitive receptors to the extent feasible.
NS-8 Adjacent land uses within 300 feet of the construction site shall be notified about the estimated duration and hours of construction activities at least 30 days before the start of construction.
NS-9 Prior to approval of any grading permits that require blasting activities and a blasting permit, the Project Applicant shall prepare and submit for City review and approval of a Blasting Noise and Vibration Monitoring and Abatement Plan (“Noise and Vibration Abatement Plan”). At a minimum, the required Noise and Vibration Abatement Plan shall include the following:
Specified blasting hours, restricting blasting only to Monday through Friday and only between the hours of 8:00 a.m. and 3:00 p.m.
Conceptual blast designs. Conceptual blast designs shall be based on “scaled distance” criteria (i.e., defined as the distance in feet between a blast drill hole and the structure of concern, divided by the square root of the explosives loading per delay period in poundsunits in feet per pound1/2). The scaled distance chosen for the initial design should be supported by statistical analysis indicating the resulting ground vibration will be less than the criteria set for the Project. The scaled distance used for production blasts may be modified based on the results of the test blast(s) but should be conservative enough to produce vibration and airblast levels within the project specifications. It should be noted that the conceptual blast designs are general and will need to be modified during the project based on actual conditions encountered in the field and the results of site-specific blasting. Test Blasts. One or more test blasts shall be performed in an area outside of critical distance of residential structures or other improvements of concern; the critical distance shall based on the scaled distance calculations with a 10 percent distance increase. Controlled Blasting Techniques. Include techniques and procedures to control and monitor flyrock, airblast, and ground vibration:
o Flyrock mitigation measures may include: soil cover, leaving alluvial materials in place over materials to be blasted, and/or blast mats.
o Crushed rock (i.e., 3/8”) should be used for stemming materials o Drill cuttings are not acceptable.
o All stemming materials should be tamped in-place.
The Blasting Noise and Vibration Abatement Plan shall include procedures for the submittal of blast reports and record keeping.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
The Blasting Noise and Vibration Abatement Plan shall outline safety measures and procedures to notify property owners that blasting will occur. If specified vibration limits are exceeded, the Noise and Vibration Abatement Plan shall require blasting operations to cease immediately, and a revised blasting plan shall be submitted to the City of Corona. Blasting shall not resume until a revised blasting plan has been reviewed and the Contractor has expressed in writing the conditions that will be applied to further blasting work.
Pre-Blast Survey Requirements. The following measures shall be specified in the Noise and Vibration Abatement Plan:
o Prior to the commencement of any blasting, a pre-blast survey of the conditions of all existing property and aboveground utilities located within 1500 feet of any potential blasting areas shall be conducted or as specified by the City of Corona, whichever is a lesser distance.
o Prior to the commencement of any blasting, notification of neighbors withing 1,500 feet of the blasting area shall be made via first class mail or hand delivery of written notice. o The pre-blast survey shall be conducted by a third-party company with a minimum of five years of experience performing pre-blast and similar type surveys. o The pre-blast survey shall include a photographic record of all visible and accessible structures, facilities, utilities, or other improvements. If property owners refuse surveys, provide copies of certified mail letters documenting attempts to provide the survey. o The required surveys shall include a description of the interior and exterior condition of the various structures examined. Descriptions shall include the locations of any cracks, damage, or other existing defects and shall include information needed to identify and describe the defect, if any, and to evaluate the construction operations on the defect.
Survey records shall include photos of all cracks and other damaged, weathered, or otherwise deteriorated structural conditions. If necessary, macro lenses and flash illumination shall be used to ensure defects are shown clearly in the photographs. Photos shall contain an accurate date stamp. No blasting shall occur prior to the completion of surveys of surrounding residential properties.
o Surveys shall be repeated at facilities or properties where damage concerns have been expressed by individual residents, property owners, or other concerned parties. Details of any observed changes to surveyed structures and documenting photos shall be reported and submitted.
Project grading and blasting contractors shall be required to ensure compliance with the Blasting Noise and Vibration Abatement Plan requirements and shall permit periodic inspection of the construction site by City of Corona staff or its designee to confirm compliance. The requirements of the Blasting Noise and Vibration Abatement Plan shall also be specified in bid documents issued to prospective construction contractors. The City of Corona shall review all monitoring reports to ensure compliance with the Blasting Noise and Vibration Abatement Plan and shall have the authority to stop all blasting activities on site if it is determined that blasting activities are not being conducted in conformance with the Blasting Noise and Vibration Abatement Plan. Additionally, project grading and blasting contractors shall be required to ensure compliance with the Corona Fire Department publication, “Explosives, Blasting and Pyrotechnics Permit Guidelines per 2022 CFC,” dated
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
December 5, 2023, and included as Technical Appendix L of Addendum No. 1 to the Skyline Heights Project Environmental Impact Report.
Public Services
PS-1 Prior to issuance of building permits, the project Applicant shall obtain CFD review and approval of the site plan, fuel modification plan, and project design features, all of which shall implement the recommendations of the Project’s Fire Protection Plan (“FPP”; Technical Appendix K to Addendum No. 1 to the Skyline Heights Project (SHP) Environmental Impact Report [“EIR”; State Clearinghouse No. 2014021003]). CFD shall review the site plan, fuel modification plan, and project design features to ensure that they incorporate all applicable recommendations of the FPP including, but not limited to roadway design to meet or exceed minimum fire and emergency access requirements including ingress/egress; driveway and fire lane width; turning radii inside and outside; grades/elevations; adequate onsite space to park CFD apparatus; fire hydrant sizing, spacing and locations; fire protection systems including automatic fire sprinkler systems and fire alarms installed in each residence; availability of adequate firefighting water flow; and approved building materials.
PS-2 Prior to the issuance of building permits, the project Applicant shall pay the required service and development fees pursuant to the “Fire Facilities Fund” as amended in Chapter 3.36 of the CMC to the City of Corona for the public improvements and facilities associated with the CFD.
PS-3 Prior to the issuance of building permits, the project Applicant shall reserve a portion of the project site for a future radio facility site, the specific size and location of which is subject to review and approval of CPD.
PS-4 Prior to the issuance of building permits, the project Applicant shall pay the required service and development fees to the City of Corona for the public improvements and facilities associated with the CPD.
PS-5 Prior to the issuance of building permits, the project Applicant shall comply with the City of Corona Municipal Code (Chapter 16.35, Park Dedication and In Lieu Fees). The City’s subdivision map review authority shall determine whether land dedication, an in lieu fee, or a combination of the two shall be required in conjunction with its approval of a subdivision map.
PS-6 Pursuant to Section 65995 of the California Government Code, the project Applicant shall pay the required SB 50 mitigation fees to the CNUSD.
PS-7 Prior to the issuance of a building permit for the construction of the proposed project, the project Applicant shall pay the required service and development fees pursuant to the Section 16.23.080 of the CMC and in the City’s Library Facility and Collection section of the Master Facility Plan to the City of Corona for the public improvements and facilities associated with the CPL.
Transportation
TR-1 Intersection 3 – Paseo Grande at Ontario Avenue: If the project is developed prior to the construction of the Foothill Parkway Extension then prior to issuance of any building permit for the project, the Applicant shall install a traffic signal and design for two-phase operation.
TR-2 Intersection 4 - Border Avenue at Ontario Avenue: Prior to issuance of any building permit for the project, a traffic signal designed for two-phase operation shall be installed. Intersection improvements shall include: 1) restriping of the eastbound shared left-through lane and the exclusive right-turn lane on Ontario Avenue to an exclusive left-turn lane and a shared through-right turn lane and 2) restriping of the westbound shared left-through lane and the exclusive right-turn lane on Ontario Avenue to an exclusive left-turn lane and a shared through-right turn lane.
TR-3 Intersection 10 - Elysia Street at Foothill Parkway: Prior to issuance of any building permit for the project, the Applicant shall install a traffic signal and design for five-phase operation to the satisfaction of the City.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Mitigation No. Mitigation Measure/Implementing Action
TR-4 Intersection 11 - Trudy Way at Foothill Parkway: Prior to issuance of any building permit for the project, the Applicant shall install a traffic signal and design for three-phase operation to the satisfaction of the City.
TR-5 Roadway Segment 2 – Paseo Grande between Ontario Avenue and Green River Road: If the project is developed prior to the construction of the Foothill Parkway Extension then the Applicant shall improve this roadway segment to a 4-Lane Secondary Roadway to the satisfaction of the City prior to issuance of any building permit for the project.
Utilities and Service Systems
UTIL-1 Prior to issuance of the first certificate of occupancy, the project Applicant shall pay the required Corona Utilities Department water connection fees as set forth in Section 13.04.040 and Section
13.14.050 of the CMC.
UTIL-2 Prior to the issuance of the first certificate of occupancy, the project Applicant shall pay the required Corona Utilities Department sewer connection fees as set forth in Section 13.08.600 of the CMC.
UTIL-3 Prior to the issuance of any demolition or construction permit, the project Applicant shall provide a copy of the receipt or contract indicating that the construction contractor shall only contract for waste disposal services with the City’s exclusive franchise contract hauler, Waste Management of the Inland Empire. The contract specifying recycled waste service shall be presented to the Municipal OperationsUtilities Department prior to approval of the first certificate of occupancy for the project.
UTIL-4 In order to facilitate onsite separation and recycling of construction related wastes, the construction contractor shall provide temporary waste separation bins on-site during demolition and construction activities.
UTIL-5 Waste Diversion. The project Applicant shall demonstrate a plan to ensure adherence to the City of Corona Waste Diversion Program, which diverts 75 percent of all waste away from landfills. The City shall ensure that the project proponent implements the waste diversion plan objectives. These requirements shall be specified in the final architectural plans to be approved by the City of Corona Planning and Building AgencyDivisions prior to issuance of building permits.
1.7 Summary of Findings
The EIR Addendum evaluates the potential environmental impacts of the revised Skyline Heights Project (SHP) in the City of Corona. The proposed development includes residential structures, associated infrastructure (such as roads, utilities, and fire protection measures), parks, and open space. The revised Project involves some modifications to the Approved Skyline Heights Project, but the general scope of the development remain consistent with the Approved Project.
Based on the analysis presented in this EIR Addendum, the revised Skyline Heights Project would not result in any new significant environmental impacts compared to those identified in the original SHP EIR. All impacts, with the exception of those related to aesthetics, would be reduced to less-than-significant levels through the implementation of mitigation measures. Impacts to aesthetics, however, would remain significant and unavoidable, consistent with the findings of the original EIR. The Project incorporates additional biological mitigation measures to further reduce potential impacts to biological resources, ensuring that all environmental impacts are effectively addressed.
In accordance with the analysis presented in Section 2.0, and pursuant to Sections 15162, 15164, and 15183 of the State CEQA Guidelines, the City of Corona has determined that:
SKYLINE HEIGHTS
Environmental Impact Report Addendum
• The Proposed Project Modifications do not result in substantial changes that would require major revisions to the previously prepared EIR due to new or substantially more severe significant environmental effects than previously analyzed; and
• No substantial changes in circumstances have occurred that would result in new or more severe significant environmental impacts than previously analyzed; and
• No new information of substantial importance as described in Section 15162 (a)(3) has been identified that would require major revisions to the analysis or conclusions presented in the previously-prepared EIR.
1.8 Cumulatively-Considerable Impacts
Cumulative effects that would result from implementation of the Project have been evaluated throughout this EIR Addendum, which concludes that, with exception of significant and unavoidable impacts to aesthetics as disclosed by the SHP EIR, such impacts would not occur, would be less than significant, or would be reduced to a level below significant with implementation of the mitigation measures specified by the SHP EIR (as modified/ supplemented herein), standard County COAs, and/or regulatory requirements. Additionally, this EIR Addendum concludes that the Project as proposed would not result in any new or more severe cumulative effects beyond what was already evaluated and disclosed by the SHP EIR. All applicable mitigation measures identified as part of the SHP EIR and that were imposed to address cumulatively-considerable effects would continue to apply to the Project as revised, except as modified or supplemented by this Addendum to the SHP EIR. The analysis throughout this EIR Addendum demonstrates that all Project impacts would be less than significant, or would be reduced in comparison to the analysis and conclusions of SHP EIR. Additionally, the analysis herein demonstrates that physical impacts associated with the Project (e.g., biological resources, cultural resources, geology/soils, etc.) would not substantially change or increase compared to the analysis presented in SHP EIR. Therefore, because the Project would have similar or reduced cumulative impacts to the environment as compared to what was evaluated and disclosed in SHP EIR, the Project would not result in any new or increased impacts to the environment beyond what was evaluated, disclosed, and mitigated for by the SHP EIR. Therefore, implementation of the Project would not result in any new impacts not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
2.0 ENVIRONMENTAL CHECKLIST
State CEQA Guidelines Section 15164(a) requires that a lead agency or responsible agency shall prepare an addendum to a previously-certified Environmental Impact Report (EIR) if some changes or additions are necessary but none of the conditions described in Section 15162 of the State CEQA Guidelines calling for preparation of a subsequent EIR have occurred. State CEQA Guidelines 15168(c)(4) clarifies that where later activities involve sitespecific operations, the agency should use a written checklist or similar device to document the evaluation of the site and the activity to determine whether the environmental effects of the operation are within the scope of the prior EIR. The focus of this analysis is on the identified changes associated with the proposed Skyline Heights Specific Plan (SHSP) and Revision No. 1 to Tentative Tract Map No. 36544 (TTM 36544R1) (referred to herein as the “Project” or “proposed Project”) and whether the changes proposed as part of the Project would result in any new or more severe impacts to the environment beyond what was evaluated and disclosed in the prior EIR and whether changes or additions to the mitigation measures presented in the Skyline Heights Project EIR (herein, “SHP EIR”) are necessary to address the current Project’s environmental effects.
The following analysis is used to: (1) compare the environmental impacts of the currently-proposed Project with the impacts identified and disclosed in the previously-certified Skyline Heights Project EIR (herein, “SHP EIR”); (2) to identify whether the proposed Project would result in new or more severe significant environmental impacts beyond what was evaluated and disclosed by the SHP EIR; and (3) to identify if there have been substantial changes with respect to the circumstances under which the currently-proposed Project would be undertaken since certification of the SHP EIR that would result in new or more severe significant environmental effects. This analysis confirms that the currently-proposed Project’s impacts are within the scope of the previously-certified Skyline Heights Project EIR, and that the proposed Project would cause no new or more severe significant effects and no new or revised mitigation measures are required.
The following discussion has been undertaken pursuant to the provisions of CEQA Guidelines Section 15164 to provide the City of Corona with the factual basis for determining whether any of the conditions listed in State CEQA Guidelines Section 15162 calling for the preparation of a Subsequent EIR have occurred with respect to the currently-proposed Project. Pursuant to State CEQA Guidelines Section 15164(a), if none of the conditions listed in State CEQA Guidelines Section 15162 are met, then the City of Corona, as Lead Agency for the proposed Project, is required to prepare an EIR Addendum for the currently-proposed Project.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
2.1 Aesthetics
New
Significant
Impact
More
Severe
Impacts
New Ability to
Substantially
Reduce
Significant
Impact
No Substantial
Change from
Previous
Analysis
Except as provided in Public Resources Code Section 21099, would the Project:
a. Have a substantial adverse effect on a scenic vista? ☐ ☐ ☐ ☒ b. Substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic
buildings within a state scenic highway?
☐ ☐ ☐ ☒
c. In non-urbanized areas, substantially degrade the
existing visual character or quality of public views of the site and its surroundings? (Public views are those
that are experienced from publicly accessible vantage
point). If the project is in an urbanized area, would
the project conflict with applicable zoning and other
regulations governing scenic quality?
☐ ☐ ☐ ☒
d. Create a new source of substantial light or glare,
which would adversely affect day or nighttime views
in the area?
☐ ☐ ☐ ☒
ENVIRONMENTAL ANALYSIS
a) Would the Project have a substantial adverse effect on a scenic vista? Skyline Heights Project EIR Findings: Significant and Unavoidable Impact. The SHP EIR found that construction and operation of the SHP would permanently alter the viewshed at the site and views of scenic resources in the local area. Therefore, the SHP EIR identified significant and unavoidable impacts relative to views and scenic vistas. (Corona, 2015, pp. 4.A-14 to 4.A-15)
EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. The currently-proposed Project would result in reduced impacts to scenic vistas in comparison to the project evaluated in the SHP EIR. Specifically, the proposed Project would decrease the number of dwelling units by 16 (from 292 to 276 units). It also would reduce the area of physical disturbance, with the Approved Project affecting approximately 170.70 acres of the property, while the proposed Project would disturb only 151.8 acres on site and approximately 7.0 acres off site, with the off-site impact areas mostly comprising developed/disturbed/ornamental vegetation types. In general, the proposed Project's areas of disturbance would remain within the limits identified in the Approved Project.
Furthermore, the proposed Project would increase open space (i.e., natural open space, manufactured slopes, drainage basins, and public/private parks) from 149.55 acres under the Approved Project to 182.48 acres under the proposed Project, which represents an increase of 22.0% compared to the Approved Project. Areas of additional open space include the southern portion of the property that is located at higher elevations. Moreover, the land uses proposed as part of the Project, including proposed residential and park uses, would be substantially
SKYLINE HEIGHTS
Environmental Impact Report Addendum
consistent with the project evaluated in the SHP EIR. Furthermore, future development on site would be subject to compliance with the development standards and design guidelines contained in the proposed Skyline Heights Specific Plan, whereas the Approved Project was not subject to any approved specific plans. Based on these considerations, it can be concluded that the currently-proposed Project would result in an overall reduction in impacts to scenic vistas as compared to the project evaluated in the SHP EIR.
Although the Project would result in reduced impacts to scenic vistas, consistent with the findings of the SHP EIR the currently-proposed Project still would result in a significant and unavoidable impacts to scenic vistas due to its location west of Chase Drive, a City-designated scenic corridor; due to the extensive amount of grading and landform alteration required on site; and due to adverse effects to views of the Santa Ana Mountains from Chase Drive. However, these impacts would be reduced in comparison to the project evaluated in the SHP EIR due to the increase in open space areas by approximately 22.0%, the reduction in the amount of grading required on site, the reduction in the number of proposed residential dwelling units from 292 to 276 units, and due to mandatory compliance with the development standards and design guidelines set forth in the proposed Skyline Heights Specific Plan. Therefore, the proposed Project would result in reduced impacts to scenic vistas as compared to the significant and unavoidable impacts previously identified by the SHP EIR, although these impacts would remain significant and unavoidable with implementation of the proposed Project.
Based on the foregoing analysis, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR. b) Would the Project substantially damage scenic resources, including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway? Skyline Heights Project EIR Findings: Significant and Unavoidable Impact. The SHP EIR found that although the SHP would alter the foothills of the Santa Ana Mountains, long-distance views of the mountains from Chase Avenue would remain. The SHP EIR found that there are no trees, rock outcroppings, or historic buildings designated in the area that would be affected by the SHP. Nonetheless, the SHP EIR found that due to the substantial modification of on-site topography and introduction of urban uses into an existing undeveloped area, impacts to scenic resources were disclosed as a significant and unavoidable impact. (Corona, 2015, pp. 4.A-15 to 4.A-16) EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. Consistent with the discussion presented above for Threshold a), the currently-proposed Project would result in reduced impacts to scenic resources in comparison to the project evaluated in the SHP EIR. Specifically, the proposed Project would decrease the number of dwelling units by 16 (from 292 to 276 units). It also would reduce the area of physical disturbance, with the Approved Project affecting approximately 170.70 acres of the property, while the proposed Project would disturb only 151.8 acres on site and approximately 7.0 acres off site, with the off-site impact areas mostly comprising developed/disturbed/ ornamental vegetation types. In general, the proposed Project's areas of disturbance would remain within the limits identified in the Approved Project. Furthermore, the proposed Project would increase open space (i.e., natural open space, manufactured slopes, drainage basins, and public/private parks) from 149.55 acres under the Approved Project to 182.48 acres under the proposed Project, which represents an increase of 22.0% compared to the Approved Project. Areas of additional open space include the southern portion of the property that is located at higher elevations. Moreover, the land uses proposed as part of the Project, including proposed residential and park uses, would be substantially consistent with the project
SKYLINE HEIGHTS
Environmental Impact Report Addendum
evaluated in the SHP EIR. Furthermore, future development on site would be subject to compliance with the development standards and design guidelines contained in the proposed Skyline Heights Specific Plan, whereas the Approved Project was not subject to any approved specific plans. Based on these considerations, it can be concluded that the currently-proposed Project would result in an overall reduction in impacts to scenic resources visible from a State scenic highway as compared to the project evaluated in the SHP EIR.
Although the Project would result in reduced impacts to scenic resources visible within a State scenic highway, consistent with the findings of the SHP EIR the currently-proposed Project still would result in a significant and unavoidable impacts to scenic resources visible from a State scenic highway. Impacts to scenic highways would occur due to the Project site’s location west of Chase Drive, a City-designated scenic corridor; the extensive amount of grading and landform alteration required on site; and adverse effects to views of the Santa Ana Mountains from Chase Drive. However, these impacts would be reduced in comparison to the project evaluated in the SHP EIR due to the increase in open space areas by approximately 22.0%, the reduction in the amount of grading required on site, the reduction in the number of proposed residential dwelling units from 292 to 276 units, and due to mandatory compliance with the development standards and design guidelines set forth in the proposed Skyline Heights Specific Plan. Therefore, the proposed Project would result in reduced impacts to scenic resources visible within a State scenic highway as compared to the significant and unavoidable impacts previously identified by the SHP EIR, although these impacts would remain significant and unavoidable with implementation of the proposed Project.
Based on the foregoing analysis, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR. c) In non-urbanized areas, would the Project substantially degrade the existing visual character or quality of public views of the site and its surroundings? (Public views are those that are experienced from publicly accessible vantage point). If the Project is in an urbanized area, would the Project conflict with applicable zoning and other regulations governing scenic quality? Skyline Heights Project EIR Findings: Significant and Unavoidable Impact. The SHP EIR found that implementation of the SHP would alter the topography of the foothills of the Santa Ana Mountains. In addition, the SHP EIR found that the existing views would be altered with the development of 292 single-family residences. While the SHP EIR found that the SHP would incorporate project design features to minimize impacts, such as the clustering of residences, the SHP EIR found that the SHP would alter the visual character or quality of the site and its surroundings. Therefore, the SHP EIR found that the SHP would result in a significant and unavoidable impact to the visual character and quality of the site. (Corona, 2015, pp. 4.A-16 to 4.A-21) EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. The proposed Project would result in a substantial change to the visual character or quality of public views of the site and surroundings due to the extensive amount of grading required to implement the Project and due to the substantial change in the site’s character from open space to that of a master-planned residential community. However, the currently-proposed Project would result in reduced impacts related to visual character and quality as compared to the project evaluated in the SHP EIR. Specifically, the proposed Project would decrease the number of dwelling units by 16 (from 292 to 276 units). It also would reduce the area of physical disturbance, with the Approved Project affecting approximately 170.70 acres of the property, while the proposed Project would disturb only 151.8 acres on site and
SKYLINE HEIGHTS
Environmental Impact Report Addendum
approximately 7.0 acres off site, with the off-site impact areas mostly comprising developed/disturbed/ ornamental vegetation types. In general, the proposed Project's areas of disturbance would remain within the limits identified in the Approved Project. Furthermore, the proposed Project would increase open space (i.e., natural open space, manufactured slopes, drainage basins, and public/private parks) from 149.55 acres under the Approved Project to 182.48 acres under the proposed Project, which represents an increase of 22.0% compared to the Approved Project. Areas of additional open space include the southern portion of the property that is located at higher elevations. Moreover, the land uses proposed as part of the Project, including proposed residential and park uses, would be substantially consistent with the project evaluated in the SHP EIR.
Furthermore, future development on site would be subject to compliance with the development standards and design guidelines contained in the proposed Skyline Heights Specific Plan, whereas the Approved Project was not subject to any approved specific plans. Based on these considerations, the currently-proposed Project would result in an overall reduction in impacts to scenic resources visible from a State scenic highway as compared to the project evaluated in the SHP EIR.
Although the Project would result in reduced impacts compared to the project evaluated by the SHP EIR, consistent with the findings of the SHP EIR, the currently-proposed Project still would result in a significant and unavoidable impacts to scenic resources visible from a State scenic highway. Impacts to scenic highways would occur due to the Project site’s location west of Chase Drive, a City-designated scenic corridor; the extensive amount of grading and landform alteration required on site; and adverse effects to views of the Santa Ana Mountains from Chase Drive. However, these impacts would be reduced in comparison to the project evaluated in the SHP EIR due to the increase in open space areas by approximately 22.0%, the reduction in the amount of grading required on site, the reduction in the number of proposed residential dwelling units from 292 to 276 units, and due to mandatory compliance with the development standards and design guidelines set forth in the proposed Skyline Heights Specific Plan. Therefore, the proposed Project would result in reduced impacts to scenic resources visible within a State scenic highway as compared to the significant and unavoidable impacts previously identified by the SHP EIR, although these impacts would remain significant and unavoidable with implementation of the proposed Project.
Based on the foregoing analysis, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR. d) Would the Project create a new source of substantial light or glare, which would adversely affect day or nighttime views in the area?
Skyline Heights Project EIR Findings: Less-than-Significant Impact. The SHP EIR found that implementation of the SHP would not create substantial light or glare which would adversely affect views in the area. Therefore, the SHP EIR found that the SHP would result in less-than-significant impacts with respect to light and glare.
EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. The Project site does not currently generate significant light or glare under existing conditions. Existing sources of light and glare in the surrounding area are mainly from exterior lighting associated with residential properties to the north and east and associated street lighting. The ambient nighttime lighting in the vicinity is typical of residential neighborhoods.
Consistent with the project evaluated in the SHP EIR, the proposed Project would introduce new sources of light due to the construction of 276 residential units, seven public/private parks, and streetlights along proposed onPage 1696 of 3613
SKYLINE HEIGHTS
Environmental Impact Report Addendum
site roadways. These new light sources would include residential lighting on the houses, security lighting in yards and garages, streetlights, and vehicle headlights from Project-related traffic. The exteriors of the proposed homes are expected to be finished with a mix of materials such as stucco, brick, wood, and tile, similar to other existing homes in the area. At night, interior lighting and vehicle movement on the new streets would contribute additional light. However, and consistent with the findings of the SHP EIR, interior lighting from the residences is generally small-scale and well-contained, meaning it would not significantly affect nearby properties. Also consistent with the findings of the SHP EIR, the movement of vehicles within the development would be partially shielded by buffer walls and landscaping between the Project site and neighboring properties. Moreover, the total amount of lighting required on site would be reduced in comparison to what was assumed by the SHP EIR due to the reduction in the number of dwelling units from 292 dwelling units under the approved TTM 36544 to 276 dwelling units under the proposed TTM 36544R1.
Regarding street lighting, the City of Corona’s Municipal Code specifies standards for the design, placement, and operation of public lighting. It mandates that all lighting must be directed downward to minimize spillover onto adjacent properties, sensitive areas, and open space. This regulation ensures that any new development complies with lighting standards to prevent significant light pollution. Therefore, adherence to these guidelines, which are enforced during the approval process for the Project, would help minimize any potential impacts from street lighting.
In summary, the site is currently vacant and does not produce glare. Consistent with the findings of the SHP EIR, while the addition of new sources of lighting and reflective surfaces, such as windows, vehicles, and rooftops, may introduce new sources of light and glare to the Project area, due to the distance from neighboring homes, the site’s natural topography, and the similar lighting characteristics of the surrounding residential areas, impacts due to light and glare would be less than significant and reduced in comparison to the project evaluated in the SHP EIR. Based on the foregoing analysis, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR.
2.2 Agriculture/Forestry Resources
New
Significant
Impact
More
Severe
Impacts
New Ability to
Substantially
Reduce Significant
Impact
No Substantial
Change from
Previous
Analysis
Would the Project:
a. Convert Prime Farmland, Unique Farmland, or
Farmland of Statewide Importance (Farmland), as
shown on the maps prepared pursuant to the
Farmland Mapping and Monitoring Program of the
California Resources Agency, to non-agricultural
use?
☐ ☐ ☐ ☒
b. Conflict with existing zoning for agricultural use, or a Williamson Act contract? ☐ ☐ ☐ ☒
SKYLINE HEIGHTS
Environmental Impact Report Addendum
New
Significant
Impact
More
Severe
Impacts
New Ability to
Substantially
Reduce Significant
Impact
No Substantial
Change from
Previous
Analysis
c. Conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code
Section 12220(g)), timberland (as defined by Public
Resources Code Section 4526), or timberland
zoned Timberland Production (as defined by
Government Code Section 51104(g))?
☐ ☐ ☐ ☒
d. Result in the loss of forest land or conversion of
forest land to non-forest use? ☐ ☐ ☐ ☒
e. Involve other changes in the existing environment
which, due to their location or nature, could result
in conversion of Farmland, to non-agricultural use
or conversion of forest land to non-forest use?
☐ ☐ ☐ ☒
ENVIRONMENTAL ANALYSIS
a) Would the Project convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? d) Would the Project result in the loss of forest land or conversion of forest land to non-forest use? e) Would the Project involve other changes in the existing environment which, due to their location or nature, could result in conversion of Farmland, to non-agricultural use or conversion of forest land to non-forest use?
Skyline Heights Project EIR Findings: Less-than-Significant Impact. The SHP EIR found that the SHP would not directly convert or otherwise result in the conversion of any existing agricultural land to non-agricultural uses, or forest land to non-forest use, and would not trigger a significant impact per the Land Evaluation and Site Assessment (LESA) Model. As such, the SHP EIR found that impacts related to conversion of farmland and forest land would be less than significant. (Corona, 2015, pp. 4.O-5 to 4.O-7) EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. No land designated as forest land exists within the Project boundaries, and therefore, implementation of the proposed Project would not directly convert any forest land to a non-forest use. Additionally, although the Cleveland National Forest is located to the west and south of the Project site, the proposed development would not affect any forest land or forestry resources. As such, and consistent with the findings of the SHP EIR, impacts related to the conversion of forest land would be less than significant.
The general conditions at the Project site have not substantially changed since with SHP EIR was certified. Based on the LESA model that was included as Appendix B to the SHP EIR, the final LESA score for the Project site was calculated at 21.79 points out of a possible 100 points, with a Land Evaluation score of 6.79 and a Site Assessment
SKYLINE HEIGHTS
Environmental Impact Report Addendum
score of 15.00. The total LESA score is between 0 and 39 points, and both of the scores associated with the Land Evaluation factors and the Site Assessment factors were below the threshold of 20 points, indicating that soils on the Project site are not considered to comprise Farmland. Therefore, and consistent with the conclusion reached by the SHP EIR, the proposed Project would not convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland) to non-agricultural use, and impacts would be less than significant. Additionally, due to the lack of agricultural activities in the local area, the Project also would have no potential to result in indirect impacts to existing agricultural uses, and as such impacts due to the conversion of Farmland to a nonagricultural use also would be less than significant.
Based on the foregoing analysis, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR. b) Would the Project conflict with existing zoning for agricultural use, or a Williamson Act contract? c) Would the Project conflict with existing zoning for, or cause rezoning of, forest land (as defined in Public Resources Code Section 1220(g)), timberland (as defined by Public Resources Code Section 4526), or timberland zoned Timberland Production (as defined by Government Code Section 51104(g))? Skyline Heights Project EIR Findings: Less-than-Significant Impact. The SHP EIR found that the SHP would not conflict with existing zoning for agricultural uses or forest land or a Williamson Act contract, and concluded that impacts in this regard would be less than significant. (Corona, 2015, pp. 4.O-7 and 4.O-8) EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. The Project site is currently zoned Single-Family Residential (R-1-7.2), with a minimum lot size of 7,200 square feet. No portion of the Project site currently is zoned for agricultural or forestry uses, and the proposed Skyline Heights Specific Plan would not result in any changes to the site’s existing zoning classifications. Additionally, no lands surrounding the Project site are zoned primarily for agricultural uses under existing conditions. Therefore, the proposed Project would not conflict with zoning for agricultural use and would not conflict with existing zoning of forest land, timberland, or timberland zoned Timberland Production. Accordingly, and consistent with the findings of the SHP EIR, Project impacts due to a conflict with existing zoning for agricultural or forestry uses would be less than significant.
According to mapping information available from Riverside County Geographic Information Systems (GIS), no portion of the Project site is located within an Agricultural Preserve. The nearest lands located within an Agricultural Preserve occur approximately 642 feet to the south of the southeastern corner of the Project site (Tin Mine Canyon 1 Agricultural Preserve). Under the State Williamson Act, only lands within a County-adopted Agricultural Preserve are eligible for a Williamson Act contract. Accordingly, the Project site is not subject to any Williamson Act contracts, and the Project therefore would have no potential to conflict with any Williamson Act contracts affecting the Project site. Additionally, although the Tin Mine Canyon 1 Agricultural Preserve is located approximately 642 feet south of the Project site, a review of aerial photographs shows that these lands only appear to be used for dryland farming. Due to the distance between the Project site and the Tin Mine Canyon 1 Agricultural Preserve and because agricultural activities within the Tin Mine Canyon 1 Agricultural Preserve are limited to dryland farming, the residential uses proposed as part of the Project would have no potential to result in a conflict with existing agricultural uses within the Tin Mine Canyon 1 Agricultural Preserve. Consistent with the findings of the SHP EIR, impacts would be less than significant. (RCIT, n.d.; Google Earth, 2024)
SKYLINE HEIGHTS
Environmental Impact Report Addendum
Based on the foregoing analysis, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR.
2.3 Air Quality
New
Significant
Impact
More
Severe
Impacts
New Ability to
Substantially
Reduce Significant
Impact
No Substantial
Change from
Previous
Analysis
Would the Project:
a. Conflict with or obstruct implementation of the
applicable air quality plan? ☐ ☐ ☐ ☒
b. Violate any air quality standard or contribute
substantially to an existing or projected air quality
violation?
☐ ☐ ☐ ☒
c. Result in a cumulatively considerable net increase
of any criteria pollutant for which the project
region is nonattainment under an applicable
federal or state ambient air quality standard
(including release of emissions which exceed
quantitative thresholds for ozone precursors)?
☐ ☐ ☐ ☒
d. Expose sensitive receptors to substantial pollutant
concentrations? ☐ ☐ ☐ ☒
e. Create objectionable odors that would affect a
substantial number of people? ☐ ☐ ☐ ☒
f. Conflict with any applicable plan, policy, or
regulation of an agency with jurisdiction over the
project (including, but not limited to, the general
plan and municipal code) adopted for the purpose
of avoiding or mitigating an environmental effect?
☐ ☐ ☐ ☒
ENVIRONMENTAL ANALYSIS
In order to evaluate the proposed Project’s potential to result in significant air quality impacts, a Project-specific technical study was prepared for the Project by Urban Crossroads, Inc. (herein, “UC”). This report is titled, “Skyline Heights Air Quality and Greenhouse Gas Assessment” (herein, “AQ/GHG Assessment”), is dated February 14, 2024, and is included as Technical Appendix C to this EIR Addendum (UC, 2024). It should be noted that the Project’s AQ/GHG Assessment evaluates the Project’s potential air quality and greenhouse gas (GHG) emissions assuming buildout of the 276 dwelling units accommodated by proposed TTM 36544R1. Furthermore, environmental effects associated with development of the Project site with up to 292 dwelling units previously were fully evaluated as part of the SHP EIR. Accordingly, the focus of this subsection is on the current Project’s potential impacts due to air quality emissions in comparison to what was evaluated and disclosed by the SHP EIR based on a reduction in the number of proposed units from 292 units as evaluated by the SHP EIR to 276 units under the proposed Project.
SKYLINE HEIGHTS
Environmental Impact Report Addendum
a) Would the Project conflict with or obstruct implementation of the applicable air quality plan? Skyline Heights Project EIR Findings: Less-than-Significant Impact. The SHP EIR found that implementation of the SHP would not conflict or obstruct implementation of the South Coast Air Quality Management District (SCAQMD) Air Quality Management Plan (AQMP). Thus, the SHP EIR concluded that the SHP would result in a lessthan-significant impact. (Corona, 2015, pp. 4.B-25 to 4.B-27) EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. The Project site is located within the South Coast Air Basin (SCAB), which is characterized by relatively poor air quality. The SCAQMD has jurisdiction over an approximately 10,743 square-mile area consisting of the four-county Basin and the Los Angeles County and Riverside County portions of what use to be referred to as the Southeast Desert Air Basin. In these areas, the SCAQMD is principally responsible for air pollution control, and works directly with the Southern California Association of Governments (SCAG), county transportation commissions, local governments, as well as State and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet State and federal ambient air quality standards. Currently, these State and federal air quality standards are exceeded in most parts of the SCAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy. (UC, 2024, p. 20) In December 2022, and subsequent to certification of the SHP EIR, the SCAQMD released the Final 2022 AQMP.
The 2022 AQMP continues to evaluate current integrated strategies and control measures to meet the California Ambient Air Quality Standards (CAAQS), as well as explore new and innovative methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing co-benefit programs from other sectors, and developing a strategy with fair-share reductions at the federal, State, and local levels. Similar to the 2012 AQMP that was evaluated by the SHP EIR, the 2022 AQMP incorporates scientific and technological information and planning assumptions, including the 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (2020-2045 RTP/SCS). The 2020-2045 RTP/SCS was approved on April 4, 2024, subsequent to certification of the SHP EIR, and is a planning document that supports the integration of land use and transportation to help the region meet the federal metropolitan planning organization (MPO) requirements under the Sustainable communities and Climate Protection Act. The proposed Project would be developed in accordance with all applicable rules and regulations contained in those plans. (UC, 2024, p. 20) The Project’s consistency with the AQMP will be determined using the 2022 AQMP. Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section 12.3 of the 1993 CEQA Handbook.
These indicators are discussed below. (UC, 2024, p. 20) • Consistency Criterion No. 1: Potential to result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP.
The violations under this criterion refer to the California Ambient Air Quality Standards (CAAQS) and National Ambient Air Quality Standards (NAAQS). CAAQS and NAAQS violations would occur if Regional or localized significance thresholds were exceeded. As discussed under the analyses of Thresholds b), c), and d) below, the Project’s Regional and localized construction and operational-source emissions would not exceed any of the
SKYLINE HEIGHTS
Environmental Impact Report Addendum
SCAQMD’s Regional or localized significance thresholds. As such, the proposed Project would not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP. On the basis of the preceding discussion, the Project is determined to be consistent with the first criterion. (UC, 2024, pp. 20-21)
• Consistency Criterion No. 2: Potential to exceed the assumptions in the AQMP based on the years of Project build‐out phase.
The 2022 AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in the district are provided to the SCAG, which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. Development consistent with the growth projections in City of Corona General Plan is considered to be consistent with the AQMP. (UC, 2024, p. 21) Peak day emissions generated by construction activities are largely independent of land use assignments, but rather are a function of development scope and maximum area of disturbance. Irrespective of the site’s land use designation, development of the site to its maximum potential would likely occur, with full disturbance of the portions of the site proposed for development occurring during construction activities. As such, when considering that no emissions thresholds would be exceeded, the Project’s construction emissions would not exceed the assumptions in the AQMP. (UC, 2024, p. 21)
As previously shown on Figure 2, and as described herein in Subsection 1.1, the City of Corona previously approved GPA13-003, which redesignated the 249.39-acre Project site for “Low Density Residential (3-6 dwelling units/acre)” land uses. As noted above, the AQMP bases its growth forecasts, in part, on the land use designations provided in each local jurisdiction’s General Plan. The site’s adopted General Plan land use designation allows for development of the Project site at a maximum density of 3-6 dwelling units per acre (du/ac). Thus, based on the site’s adopted General Plan land use designation, the AQMP assumed development of the 249.39-acre Project site with up to 1,496 dwelling units (249.39 acres x 6 du/ac = 1,496.34 du).
The Project Applicant is proposing a revision to the previously-approved Tentative Tract Map (TTM 36544R1), which would reduce the number of dwelling units allowed on site by 16 units, from 292 units under the Approved Project to 276 dwelling units under the proposed Project. Specifically, TTM 36544R1 would subdivide the Project site to provide for 92 single family-detached housing units on minimum 7,200 square foot lots, three custom singlefamily lots, 104 eight-cluster single-family detached housing units, and 77 four-cluster single-family detached housing units. The proposed 276 residential units would occur in the same general location as previously-approved 292 dwelling units, and all of the dwelling units that are proposed as part of TTM 36544R1 are located within the portions of the Project site that are designated by the General Plan for “Low Density Residential (3-6 dwelling units/acre)” and zoned for R-1-7.2 (single-family residential, 7,200 square-foot minimum lot size). The 276 dwelling units proposed under the Project is far less than the 1,496 dwelling units allowed on site based on the site’s existing “Low Density Residential (3-6 dwelling units/acre)” land use designation.
Thus, given that the 2022 AQMP relies on growth inputs based on the existing General Plan land use designations for the various jurisdictions within the SCAB region, and because the proposed Project includes far fewer dwelling
SKYLINE HEIGHTS
Environmental Impact Report Addendum
units than otherwise is allowed based on the site’s adopted “Low Density Residential (3-6 dwelling units/acre)” land use designation, the proposed Project would not exceed the assumptions in the 2022 AQMP based on the years of Project build-out phase. Accordingly, the proposed Project would be consistent with the 2022 AQMP based on this criterion.
Conclusion
Consistent with the conclusion reached by the SHP EIR, because the proposed Project is consistent with site’s land use designations, would not exceed any applicable regional or local thresholds, and would not result in or cause NAAQS or CAAQS violations, the Project is therefore considered to be consistent with the 2022 AQMP and a lessthan-significant impact is expected. Therefore, the proposed Project would not result in any new impact not already analyzed in the SHP EIR or increase the severity of a significant impact previously identified and analyzed in the SHP EIR.
b) Would the Project violate any air quality standard or contribute substantially to an existing or projected air quality violation?
c) Would the Project result in a cumulatively considerable net increase of any criteria pollutant for which the region is nonattainment under an applicable federal or state ambient air quality standard (including release of emissions which exceed quantitative thresholds for ozone precursors)? Skyline Heights Project EIR Findings: Less-than-Significant Impact. The regional significance analysis for construction and operational emissions as provided in the SHP EIR demonstrated that emissions would be below the regional significance thresholds. Therefore, the SHP EIR found that implementation of the SHP would not violate any air quality standard, would not result in a cumulatively considerable net increase of any criteria pollutant for which the region is nonattainment under an applicable federal or State ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors), and would not contribute substantially to an existing or projected air quality violation. (Corona, 2015, pp. 4.B-27 to 4.B-32) EIR Addendum No. 1 Finding: No Substantial Change from Previous Analysis. Both the U.S. Environmental Protection Agency (EPA) and the California Air Resources Board (CARB) have established ambient air quality standards for common pollutants. These ambient air quality standards are levels of contaminants representing safe levels that avoid specific adverse health effects associated with each pollutant. The ambient air quality standards cover what are called “criteria” pollutants because the health and other effects of each pollutant are described in criteria documents. The six criteria pollutants are ozone (O3) (precursor emissions include NOX and reactive organic gases [ROG]), Carbon Monoxide (CO), particulate matter smaller than 10 microns (PM10), particulate matter smaller than 2.5 microns (PM2.5), nitrogen dioxide (NO2), sulfur dioxide (SO2), and lead. Areas that meet ambient air quality standards are classified as attainment areas, while areas that do not meet these standards are classified as nonattainment areas. The Riverside County portion of the SCAB is designated as a nonattainment area for the federal O3 and PM2.5 standards and is also a nonattainment area for the State standards for O3, PM10, and PM2.5. (UC, 2024, p. 6)
The SCAQMD has developed regional significance thresholds for criteria pollutants, as summarized in Table 3, Maximum Daily Regional Emissions Thresholds. The SCAQMD’s CEQA Air Quality Significance Thresholds (March 2023) indicate that any projects in the South Coast Air Basin (SCAB) with daily emissions that exceed any of the
SKYLINE HEIGHTS
Environmental Impact Report Addendum
indicated thresholds should be considered as having an individually and cumulatively significant air quality impact. (UC, 2024, p. 10)
Table 3 Maximum Daily Regional Emissions Thresholds
Pollutant Construction Operations
NOX 100 lbs/day 55 lbs/day
VOC 75 lbs/day 55 lbs/day
PM10 150 lbs/day 150 lbs/day
PM2.5 55 lbs/day 55 lbs/day
SOX 150 lbs/day 150 lbs/day
CO 550 lbs/day 550 lbs/day
(UC, 2024, Table 1)
The proposed Project has the potential to exceed the SCAQMD Regional Thresholds during both near-term construction activities and long-term operation. Provided below is a discussion of the assumptions and modeling inputs for the Project’s construction and operational phases, along with an evaluation as to whether the proposed Project would exceed any of the SCAQMD Regional thresholds identified in Table 3 and a comparison of the proposed Project’s construction and operational emissions to the emission levels reported by the SHP EIR for the Approved Project.
Regional Construction-Related Emissions
Construction activities associated with the Project would result in emissions of VOCs, NOX, SOX, CO, PM10, and PM2.5. Construction-related emissions are expected from the following construction activities: demolition, site preparation, grading/blasting, building construction, paving, and architectural coating. Each is briefly discussed below. (UC, 2024, pp. 11-12)
Construction Modeling Inputs and Assumptions
Grading Activities
Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called “fugitive emissions.” Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). The California Emissions Estimator Model (CalEEMod) was utilized to calculate fugitive dust emissions resulting from this phase of activity. Per client provided data, this analysis assumes that earthwork activities are expected to balance on site and no import or export of soils would be required.
Blasting Activities
The Project site may require blasting. While the need for blasting is not known at this point, the emissions effects of blasting are included in this analysis. For modeling purposes, it is anticipated no more than two blasting events could occur per day for logistics and safety reasons. The estimated emissions of NOX, CO, and SOX from explosives used for blasting were determined using emission factors in Section 13.3 (Explosives Detonation) of AP-42, Compilation of Air Emissions Factors from Stationary Sources, and PM10 and PM2.5 emissions were determined using Section 11.9 of AP-42. According to AP-42, “Unburned hydrocarbons also result from explosions, but in most instances, methane is the only species that has been reported”; methane is not a VOC, and a methane emission
SKYLINE HEIGHTS
Environmental Impact Report Addendum
factor has not been determined for ammonium nitrate/fuel oil (ANFO). While equipment emissions are included in overall construction emission estimates blasting activities would limit onsite activity for safety reasons and no other significant activities would occur on the same day other than a few pieces of equipment supporting the blasting activity. Blast emissions are based on a maximum of 1-ton ANFO per day for CO, NOX, and SO2, PM10, and PM2.5 emissions estimates are conservative and assuming the entire 123.0 acres of the Project site proposed for grading as the blast areas. Blasting is anticipated to result in 0.84 pounds (lbs.) of CO, 0.21 lbs. of NOX, 0.03 lbs. of SO2, 10.3 lbs. of PM10, and 6.12 lbs. of PM2.5 per day. (UC, 2024, p. 12) On-Road Trips
Construction generates on-road vehicle emissions from vehicle usage for workers, vendors, and haul trucks commuting to and from the site. Worker and hauling trips are based on the CalEEMod defaults. It should be noted that for vendor trips, specifically, CalEEMod only assigns vendor trips to the Building Construction phase. Vendor trips would likely occur during all phases of construction. As such, the CalEEMod defaults for vendor trips have been adjusted based on a ratio of the total vendor trips to the number of days of each subphase of activity. (UC, 2024, p. 12)
Construction Duration
For purposes of analysis, construction of Project is expected to commence in January 2025 and would last through December 2028, as summarized in Table 4, Construction Duration. The construction schedule utilized in the analysis represents a “worst-case” analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent2
. The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines. (UC, 2024, pp. 12-13)
Table 4 Construction Duration
Phase Name Start Date End Date Days
Demolition 1/7/2025 1/13/2025 5
Site Preparation 1/14/2025 2/21/2025 29
Grading/Blasting 2/24/2025 2/27/2026 265
Building Construction 3/2/2026 12/29/2028 740
Paving 2/28/2028 12/29/2028 220
Architectural Coating 4/26/2027 12/29/2028 440
(UC, 2024, Table 3)
Construction Equipment
As shown on Table 5, Construction Equipment, equipment based on Project Applicant provided data have been used. Consistent with industry standards and typical construction practices, each piece of equipment will operate up to a total of eight (8) hours per day, or more than two-thirds of the period during which construction activities are allowed pursuant to the code. (UC, 2024, p. 13)
2 As shown in the CalEEMod User’s Guide Version 2022.1, Section 4.3 “Off-Road Equipment” as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements.