Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
MARKET-BASED FEES
Interior 800 800 - Plus billable staff hourly rates if needed 4 CF-1006 Warehouse, Facility Rental - Filming Per Day 0 - 100% Exterior 400 400 - Interior 800 800 - Plus billable staff hourly rates if needed 4 CF-1007 Public Parking Lot, Rental - Filming Per Day 275 275 - 0 - 100% Plus billable staff hourly rates if needed
4 CF-1008 Vacant Lot or Open Space, Rental - Filming Per Day 550 550 - 0 - 100% Plus billable staff hourly rates if needed
2 CF-1009 Airport Film Permit Per Permit 0 - 100%
Photo shoot 500 500 -
Per day plus staff hourly rates if required
Film shoot (small)
Small 500 500 - Major 1,000 1,000 - Runway 10,000 10,000 - Plus billable staff hourly rates if needed
FIRE DEPARTMENT
3 FR-1000 Burn Tower Rental Per Rental 0 - 100%
Burning - Full Day $ 2,000 - (2,000)Plus billable staff hourly rates if needed 4 FR-1003 Fire Training Classroom Rental Per Rental 0 - 100% Half Day 400 - (400)Full Day 800 - (800)
4 FR-1004 Fire Training Grounds Rental Per Rental 1,000 - (1,000) 0 - 100% Plus billable staff hourly rates if needed
POLICE DEPARTMENT
4 PO-1000 Training Facility Conference Room Rental Per Rental 0 - 100% Room No. 147, 148 and Range
Half Day $ 200 200 $ - Full Day 400 400 -
4 PO-1001 Training Facility Conference Room Rental Per Rental 0 - 100% Room No. 165, 166 and 167
Half Day 400 400 -
Budget Fiscal Year 2026 Page 16 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
MARKET-BASED FEES
Full Day 800 800 -
4 PO-1002 Police Training Facility - Firearm Range Rental Per Rental 0 - 100% Pistol (10) or Rifle (5) bays
Half Day 360 360 -
Full Day 594 594 -
Both Pistol (10) or Rifle (5) bays
Half Day 660 660 -
Full Day 1,074 1,074 - Simulator - Per Day 250 250 - If rental time goes beyond 5:00 p.m. on business days, a per hour incremental cost will be added (no prorating of time/cost allowed). 185 185 -
Plus Police Officer Overtime Rate
Budget Fiscal Year 2026 Page 17 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
AIRPORT
2 AP-002 Airport Security Card Issuance Per Card 100%
Initial Setup 75 78 (3) $
Replacement Card 38 42 (4)
BUILDING DIVISION
1/3 6 BL-010 Building and Other Inspection Flat Fee 100% Building Inspection Table A Table A -
Miscellaneous Inspection Table B Table B -
Plumbing Inspection Table C Table C -Electrical Inspection Table D Table D -Mechanical Inspection Table E Table E -Tenant Improvement Table F Table F - Minimum $ 164 138 $ 26 $
1/3 6 BL-020 Building Plan Checking Flat Fee 100%
Building Plan Check Table A Table A -Miscellaneous Plan Check Table B Table B -Plumbing Plan Check Table C Table C -Electrical Plan Check Table D Table D -Mechanical Plan Check Table E Table E -Tenant Improvement Table F Table F - Minimum 138 164 26
After 3 plan checks, each plan check charged at the fully allocated hourly rate for all staff involved plus any outside costs Full Cost Full Cost -
1/3 6 BL-030 Building Occupancy Inspection Flat Fee 800 915 100% 115 1 6 BL-035 Tenant Occupancy Inspection Flat Fee 716 580 100% (136) 1 6 BL-036 Post Occupancy Inspection Flat Fee 312 377 100% 65 1 6 BL-037 Mobile Home Park Cert of Occupancy Flat Fee 212 221 100% 9 1 6 BL-070 Post Fire Building Inspection Flat Fee 1,169 1,148 100% (21) 1 6 BL-080 Special Building Inspection / Re-Inspection Deposit + Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
-
Deposit with charges at Full Cost
1 6 BL-100 Temporary Connection of Utilities Fee + Deposit 469 487 100% 18 Plus guarantee deposit per agreement 2,000 2,000 -
Deposit is forfeited if terms of the agreement are not met Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
(moved from Comm Svc,
previously CS-1030)
Budget Fiscal Year 2026 Page 18 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1/3 6 BL-130 Landscape Plan Check Flat Fee 100%
Fence & Wall Review 1,178 1,293 115
Front Yard Review 1,025 1,120 95
Plus actual contracted costs Actual Cost Actual Cost -
HOA, Slopes, Fuel Modification Review 1,244 1,465 221
Plus actual contracted costs Actual Cost Actual Cost -
Model Home Review 1,103 1,216 113
Plus actual contracted costs Actual Cost Actual Cost -
Commercial/Industrial Review 1,103 1,272 169
Plus actual contracted costs Actual Cost Actual Cost -
City Park Review 1,013 1,191 178
Minimum 138 164 26
1 2 BL-150 OSHPD3 Certification Flat Fee 145 151 100% 6 1 2 BL-160 Building Permit/Plan Extension Flat Fee 102 97 100% (5) 1 2 BL-170 Recordation Fee Actual Cost Actual Cost Actual Cost - 100% 1 2 BL-180 Fee for all other services not identified above Per Hour 203 206 100% 3 1 2 BL-190 Request for Duplication of Plans Fee Flat Fee 66 68 100% 2 -
1 2 BL-200 Additional Plan Checks Flat Fee 155 192 100% 37 1 2 BL-220 Temporary Certificate of Occupancy Fee + Deposit 100% SFR and TI's 2,000 sq ft or less $2,025 + $2,000
Deposit
$2,592+ $2,000
Deposit
567
TI's 2,000-5,000 sq ft $2,025 + $5,000
Deposit
$2,592 + $5,000
Deposit
567
All others and TI's over 5,000 sq ft $2,025 +
$10,000 Deposit
$2,592 +
$10,000 Deposit
567
Fee Discount / Waiver Notes: 1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
CITY CLERK AND GENERAL SERVICES
1 CL-010 Documentation Certification Service Per Request $ 49 $ 43 $ 100% (6) Plus Copy Charges
Budget Fiscal Year 2026 Page 19 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 CL-050 Appeal Service Per Appeal 1,472 1,410 100% (62) If a Public Works Condition 2,180 2,334 154
Plus cost of legal advertisement Current Fee Current Fee - 2 CL-060 Utility Underground Waiver Request Per Request 2,013 1,965 100% (48) 2 CL-080 FPPC Disclosure Fine Processing Set by State 10 10 Set by State - Per day up to maximum allowable by State lawGovernment Code Section 91013 2 CL-100 Candidate Filing Processing Set by State 25 25 Set by State - Government Code Section 91013
2 CL-110 City Initiative Measure Filing Set by State 200 200 Set by State - Fee is limited by State Law - Elections code section 9202(b) Fee is refundable to filer if, within one year of the date of filing the notice of intent, the elections official certifies the sufficiency of the petition 2 CL-130 Assessment of Lien for Public Nuisance Actual Cost Actual Cost Actual Cost - 100% Deposit with full cost of all personnel involvedPlus all outside costs 2 GS-010 Photocopy Service - General City Per Page 0.25 0.25 - 0 - 100% For Electronic Media Storage Copy - $2 per device 2 2 - 2 GS-020 Record Compilation Service Actual Cost Actual Cost Actual Cost - 100% First 15 minutes free per month, thereafter at full cost in 15 minute intervals plus any material cost and applicable postage costs This fee center is for use when no other fee center exists 1 GS-030 Notary Public Service Set by State 15 15 - Set by State Fee is set by State law - Civil Code Section 8211
2 GS-040 Process City Property Damage Fees Actual Cost Actual Cost Actual Cost - 100% Full costs of personnel, materials, equipment, and property 2 GS-055 Building Records Archiving Actual Cost Actual Cost Actual Cost - 100%1 GS-070 Franchise Processing Actual Cost Actual Cost Actual Cost - 100% $2,500 Deposit with charges at fully allocated hourly rates for all involved personnel. Plus outside costs, notice and publication costs, and document preparation costs. 2 GS-110 Banner Installation Actual Cost Actual Cost Actual Cost - 100% Deposit with charges at actual costs
Budget Fiscal Year 2026 Page 20 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 GS-160 Purchase of City Standards Actual Cost Actual Cost Actual Cost - 100% Actual cost of document production
2 GS-170 Miscellaneous Services Actual Cost Actual Cost Actual Cost - 100% Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside services 2 GS-1000 Other Governmental Items for Purchase Actual Cost Actual Cost Actual Cost - 100% Allows the City to offer purchases of such items (i.e. RTA Bus Passes) from other governmental agencies to the public 2 GS-1010 Subpoena / Witness Fees Actual Cost Actual Cost Actual Cost - 100% Sworn Fire and Police personnel - Deposit per Government Code Section 68097.2, charges at fully allocated hourly rates for personnel involved plus outside equipment and materials.Other City personnel - Deposit per Government Code Section 68097, charges at fully allocated hourly rates for personnel involved plus outside equipment and materials.
COMMUNITY SERVICES
2 CS-060 Heritage Room Photo Reproduction / Scan Per Request 7.50 $ $ 12.00 $ 100% 4.50 Per scanned photo
2 CS-065 Test Proctoring Per Test 195 - 145 100%
2 CS-109 Library Self Serve Copy Service Per Copy 0.10 - 1.00 0.10 - 1.00 - 0 - 100% Costs vary depending on Black and White or Color and size of copy 2 CS-110 Library Self Serve Scan Service Per Scan 0.10 - 1.00 0.10 - 1.00 - 0 - 100% Costs vary depending on Black and White or Color and size of copy 2 CS-115 Replacement of Lost Library Card Per Card 1 1 - 50% 2 CS-120 Materials Recovery Service Per Item 24 19 (5) 100% Plus collection agency costs Current Rate Current Rate - 2 CS-125 Honorary Naming or Renaming of City Property Per Application 350 350 - 0 - 100% Previously Approved by Resolution No. 2017-020
2 CS-1010 Passport Processing Fee Set by
Federal Law
35 35 - Set by
Federal Law
2 CS-1030 Airport Security Card Issuance Per Card 100%
Budget Fiscal Year 2026 Page 21 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Initial Setup 78 75 (3)Replacement Card 42 38 (4)
DEVELOPMENT SERVICES DIVISION
1 2 DS-010 Processing Alley/Street Vacations - Summary Flat Fee 100% Summary $ 2,562 $ 2,839 $ 277
Plus legal public fee Current Fee Current Fee -
Plus county filing fee Current Fee Current Fee -
Standard 3,724 4,109 385
Plus legal public fee Current Fee -
Plus county filing fee Current Fee -
2 DS-020 Assessment District Formation Research
Deposit with charges at Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
100% -
1 DS-030 Block Party Process / Street Closure Flat Fee 100% Block Party Permit 165 196 31Special Use Street Closure 589 695 106 Barricades 244 100 (144)
2 DS-040 Borrow Site Plan Check Flat Fee 2,677 2,862 100% 185 Plus Scanning Fee, per sheet 29 37 8
1 2 DS-045 Minor Plan Check Revision Flat Fee 2,000 2,117 100% 117 2 DS-050 Certificate of Correction Issuance Fee + Deposit 492 508 100% 16 Deposit with charges at set fee
1 DS-070 Homeowner Association Document Review Flat Fee 100% Initial Review 2,639 2,917 278
Plus deposit for legal costs Current Fee Current Fee -
Annexation 2,639 2,917 278
Plus deposit for legal costs Current Fee Current Fee -
6 DS-080 Drainage Study Review Flat Fee 100%
Less than 1 Acre (Minor) 1,697 1,856 159
1 to 5 Acres 5,351 5,784 433
5 Acres or More 8,629 9,314 685
6 DS-085 News Rack Permit Flat Fee 100%
1 news rack at one location 153 168 152 news rack at one location 213 241 283 news rack at one location 274 314 40Permit Renewal Processing 153 168 15Renewal Decal 21 23 2 Budget Fiscal Year 2026 Page 22 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Replacement Decal 23 21 2
6 DS-090 Encroachment Processing Services Flat Fee 323 357 34 100% Plus security deposit for street cuts Full Cost Full Cost - 3 2 DS-095 Utility Services Encroach Permit Flat Fee 100% Annual Blanket Permit 126 125 1
Blanket Permit Inspection, per day 196 177 19New Construction - Plan Check 925 918 7New Construction - Inspection, per day 380 361 19New Construction - Permit Inspection, per day 380 361 19 Permit fees will double if inspection is not notified prior to working or if the work is not permitted
2 DS-097 Encroachment Permit - Movable Flat Fee 100%
1 new item at one location 163 153 10
2 new item at one location 207 192 153 new item at one location 252 231 21Replacement Decal 11 10 1 1/3 6 DS-100 Erosion Control Plan Check Flat Fee 100%
10 Acres or Less 1,074 963 11110 to 50 Acres 1,887 1,716 171 Over 50 Acres (base, plus $3 per each acre over 50) 2,425 2,648 223 Plus scanning fee, per sheet 37 29 8
1 6 DS-110 Parcel Map Plan Check Fee + Deposit 4,058 4,304 246 100% Plus scanning fee, per sheet 37 29 8
Deposit with charges at set fee
1 6 DS-120 Tract Map Plan Check Fee + Deposit 6,193 6,541 348 100% Plus scanning fee, per sheet 37 29 8Deposit with charges at set fee 1/3 6 DS-160 Grading Inspection Flat Fee 100%
0-1,000 CY 1,073 944 129Plus each additional 250 CY up to 5,000 CY 223 197 26Plus each additional 1,000 CY over 5,000 CY 89 79 10 Per CMC 15.36.030Or deposit with charges at actual costs if using outside services for inspections 1/3 6 DS-180 Precise Grading Plan Check Flat Fee 100%
Single Family Residence , less than 1,000 CY and 1 Acre 4,948 5,049 101 One Residential Building above limits 6,031 5,700 331
All Others less than 1 acre (Base Fee) 9,046 8,455 591
Budget Fiscal Year 2026 Page 23 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
All Others Base Fee plus per Acre, 1-5 Acres Per Acre 1,268 1,281 13All Others Base Fee Plus 5 Acres, Plus Per Acre more than 5 Acres Per Acre 832 855 23 All Others 1-5,000 CY 8,526 9,131 605
All Others 5,000 - 15,000 CY (Prop. 50,000 limit) 11,479 12,263 784All Others more than 15,000 CY (plus $5 per 1,000 CY) (Prop. >50,000) 12,013 12,819 806 Plus scanning fee, per sheet 29 37 8
1/3 6 DS-190 Public Improvement Plan Check % of Valuation 100% Base/Minimum Fee 1,724 1,848 124
$0-$20K 20% 20% -
$20,001-$100k 3.5% 3.5% -$100,001-$500K 2.5% 2.5% -Over $500k 1% 1% -Plus scanning fee, per sheet 29 37 8 Public Improvement Plan Check - Traffic
TS/Comm/etc. 1-3 sht Flat Fee 4,311 5,479 1,168
TS/Comm/etc. 3-6 sht Flat Fee 8,272 10,531 2,259
1 2 DS-220 Lot Line Adjustment Flat Fee 100%
Up to 2 lots 4,107 4,629 522
Over 2 lots 4,395 5,137 742
Plus per lot over 2 lots 1,290 1,365 75
Plus scanning fee, per sheet 29 37 8
3 6 DS-230 Right of Way Construction Inspection Flat Fee 100% Permit Issuance 69 77 8
Driveway - Residential 138 152 14
Driveway - Commercial 256 286 30Sidewalk - 0 to 100 SF 190 211 21 Sidewalk - 101 to 1,000 SF 295 331 36Sidewalk - 1,001 SF or More 374 420 46 Plus per SF Over 1,001 0.10 0.10 -
Surface Repair - 0-100 SF 200 217 17Surface Repair - 101 - 1,000 SF 692 771 79Surface Repair - 1,001 SF or More 849 950 101 Plus per SF Over 1,001 0.05 0.05 -
Curb Drain 99 107 8
Temporary Construction Material 99 107 8Monitoring Well 318 351 33 Crane Operation 318 351 33Other 157 178 21
2 DS-231 Water Lateral Inspection + Deposit Fee + Deposit 117 117 - 100% Deposit with charges at set fee
2 DS-232 Sewer Lateral Inspection + Deposit Fee + Deposit 117 117 100% - Budget Fiscal Year 2026 Page 24 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Deposit with charges at set fee
3 2 DS-233 Utility Service Encroach Plan Check Flat Fee 234 270 36 100% Plus per sheet 369 329 40
2 DS-234 Double Detector Check Valve Inspection Fee + Deposit 117 117 - 100% Deposit with charges at set fee
1 2 DS-270 Stockpile / Borrow Site Permit Flat Fee 2,081 2,375 294 100% 1 DS-280 Street Closure Review Flat Fee 1,737 1,984 247 100% Per day, after first day 178 157 21Plus if using City equipment and staff for street closure Local Street, Daily Rate 675 675 -
Collector Street, Daily Rate 675 675 -
Secondary Street, Daily Rate 1,350 1,350 -
Major Arterial, Daily Rate 1,350 1,350 -
Barricades, each 3 3 -
No Parking Signs, per sign 1 1 -
6 DS-300 Subdivision Street Inspection Fee + Percentage 100% $1,600 - $20,000 Valuation 1,370 1,245 (125)
Plus percentage of valuation amount over $1,600 up to $20,000 20.68% 20.68% - $20,001-$100,000 Valuation 5,888 6,773 885
Plus percentage of valuation amount over $20,000 up to $100,000 11.81% 11.81% - $100,001-$500,000 Valuation 16,490 19,299 2,809
Plus percentage of valuation amount over $100,000 up to $500,000 5.76% 5.76% - Over $500,000 Valuation 42,156 48,597 6,441
Plus percentage of valuation amount over $500,001 3.00% 3.00% - 1 6 DS-301 Public Drain Improvement Inspection Fee + Percentage 100% $2,000 - $100,000 Valuation 1,157 1,166 9
Plus percentage of valuation amount over $2,000 up to $100,000 15.23% 15.23% - $100,001 - $500,000 Valuation 17,609 19,686 2,077
Plus percentage of valuation amount over $100,000 up to $500,000 1.50% 1.50% - Over $500,000 Valuation and Over 24,331 27,283 2,952
Plus percentage of valuation amount over $500,001 1.00% 1.00% - 1 6 DS-302 Private Drain Improvement Inspection Fee + Percentage 100% $2,000 - $100,000 Valuation 807 764 (43)
Plus percentage of valuation amount over $2,000 up to $100,000 15.77% 15.77% - $100,001 - $500,000 Valuation 17,685 19,470 1,785
Plus percentage of valuation amount over $100,000 up to $500,000 1.49% 1.49% - $500,001 Valuation and Over 24,016 26,809 2,793
Plus percentage of valuation amount over $500,001 1.10% 1.10% - Budget Fiscal Year 2026 Page 25 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 2 DS-305 Waiver of Improvement Requirements Flat Fee 968 1,448 100% 480 2 DS-310 Surety and Subordination Review Service Flat Fee 1,894 2,050 100% 156 2 DS-315 Lien Removal Flat Fee 1,759 1,959 100% 200
Plus current County Recorder fee Current Fee Current Fee - 3 DS-330 Wide and Overload Permit (Daily) Federal
Limit
16 16 Federal -
Limit
3 DS-340 Wide and Overload Permit (Annual) Federal
Limit
102 90 Federal (12)
Limit
3 DS-350 Haul Route Permit Flat Fee 100%
1,000 - 5,000 CY 824 938 114
5,001 - 25,000 CY 982 1,117 135
25,001+ CY for each additional 5,000 315 357 42
1 2 DS-360 Stockpile Plan Check Flat Fee 2,795 2,983 100% 188 Plus scanning fee, per sheet 29 37 8
1 2 DS-370 Landscape and Irrigation Plan Review (LMD) Fee + Deposit 3,398 3,927 100% 529 Plus scanning fee, per sheet 29 37 8
Deposit with charges at set fee
2 DS-380 Map Scanning Service, per sheet Flat Fee 24 31 100% 7 6 DS-420 Record of Survey - Review Flat Fee 1,096 1,303 100% 207 2 DS-430 Easement Processing / Review Legal Description Flat Fee 1,740 1,846 100% 106 2 DS-440 City Property Acquisition Processing Fee + Deposit 4,015 4,416 100% 401 Deposit with charges at set fee
1 DS-450 Street Name Sign Fabrication Flat Fee 342 401 100% 59 Includes two signs/poles and supply fee
1 2 DS-480 Water Quality Management Plan Review Flat Fee 4,179 4,540 100% 361 1 2 DS-485 Revised Water Quality Management Plan Check Flat Fee 1,433 1,586 100% 1531 2 DS-490 Water Quality Management Plan Inspection Flat Fee 577 678 100% 1011 6 DS-510 Deferral / Waiver of Impact Fees Flat Fee 2,346 2,304 100% (42) Plus actual cost for legal review and advertising (if set for public hearing) Full Cost Full Cost - 1 2 DS-511 Waiver of Permits Fee Request Flat Fee 1,534 1,508 100% (26) Budget Fiscal Year 2026 Page 26 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 DS-520 Issue Revised Bond and Fee Letter Flat Fee 174 183 100% 92 DS-530 Water / Sewer Study Fee Fee + Deposit 1,419 1,557 100% 138 Deposit with charges at set fee
1 1 DS-540 Bond Substitution Flat Fee 1,727 610 100% (1,117) 1 1 DS-550 Bond Reduction Flat Fee 2,204 1,312 100% (892) 1 DS-560 Additional Address on Existing Site Flat Fee 180 278 100% 98 Per Address
1 DS-570 Change of Address Request Flat Fee 728 800 100% 72 Per Address
1 DS-580 Change of Street Name Request Flat Fee 1,841 1,979 100% 138 Per Address
2 DS-600 Utility Locating and Marking
Per Ticket
PassThrough Pass- Through Pass- Through 100% -
1 2 DS-610 Retaining Wall Plan Check Fee + Deposit 2,193 2,382 189 100% Deposit with charges at set fee
2 DS-630 Will Serve Letter Flat Fee 342 368 26 100%
1 2 DS-660 Plan Check Time Extension Fee Flat Fee 1,067 1,112 45 100% 2 DS-670 Dry Utility - Private Street Inspection Per Day 120 126 6 100%2 DS-680 Process Cancellation Refund Fee Flat Fee 127 156 29 100% 2 DS-690 Miscellaneous Clerk Recording Fee Actual Cost Actual Cost Actual Cost - 100% 3 2 DS-1005 Address Issuance Flat Fee 100%
Per Address, 1-5 (Base Fee) 632 550 82Base Fee, plus per address, 6-40 49 40 9Base Fee, plus 40 addresses, plus per address, 41-150 22 27 5Base Fee, plus 150 addresses, plus per address, over 150 11 13 2 2 DS-1020 Rework / Unpermitted Work Deposit
Deposit with charges at Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
100% -
3 2 DS-1025 Fire Flow Report Flat Fee 447 501 54 100%
Budget Fiscal Year 2026 Page 27 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 DS-1030 Legal Lot Review Fee + Deposit 611 654 100% 43 2 DS-1035 GIS Site Exhibit Flat Fee 156 155 100% (1)
2 DS-1040 Suite Address Issuance - per building, 1-5 suites (Base Fee) Flat Fee 282 384 100% 102 Suite Address Issuance - over 5 suites, per suite 6-40 21 24 3 Suite Address Issuance - over 40 suites, per suite 41-150 12 13 1 Suite Address Issuance - over 150 suites, per suite 3 3 - 2 DS-1045 Engineering Minor Site Plan Review Flat Fee 623 759 100% 1362 DS - 1050 Meter Addressing Fee Flat Fee - 341 100% 341 Fee Discount / Waiver Notes: 1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
GENERAL SERVICES
2 GS-010 Photocopy Service - General City Per Page 0.25 0.25 - 0 - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
For Electronic Media Storage Copy - $2 per device 2 2 - 2 GS-020 Record Compilation Service Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
First 15 minutes free per month, thereafter at full cost in 15 minute intervals plus any material cost and applicable postage costs This fee center is for use when no other fee center exists 1 GS-030 Notary Public Service Set by State 15 15 - Set by State (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Fee is set by State law - Civil Code Section 8211
2 GS-040 Process City Property Damage Fees Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Full costs of personnel, materials, equipment, and property 2 GS-055 Building Records Archiving Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Budget Fiscal Year 2026 Page 28 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 GS-070 Franchise Processing Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
$2,500 Deposit with charges at fully allocated hourly rates for all involved personnel.
Plus outside costs, notice and publication costs, and document preparation costs. 2 GS-110 Banner Installation Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Deposit with charges at actual costs
2 GS-160 Purchase of City Standards Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Actual cost of document production
2 GS-170 Miscellaneous Services Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside services 2 GS-1000 Other Governmental Items for Purchase Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Allows the City to offer purchases of such items (i.e. RTA Bus Passes) from other governmental agencies to the public 2 GS-1010 Subpoena / Witness Fees Actual Cost Actual Cost Actual Cost - 100% Sworn Fire and Police personnel - Deposit per Government Code Section 68097.2, charges at fully allocated hourly rates for personnel involved plus outside equipment and materials.Other City personnel - Deposit per Government Code Section 68097, charges at fully allocated hourly rates for personnel involved plus outside equipment and materials.
FINANCE DIVISION
2 FN-010 Assessment Bond Payoff Calculation Per Parcel 73 $ 74 $ 1 $ 100% 2 FN-011 Disclosure of Special Tax (Mello-Roos) Set by State 15 15 - Set by State Set by State GC 53340.2(a)
2 FN-012 Disclosure of Special Assessment Set by State 10 10 - Set by State Set by State SHC code 8500
2 FN-013 Escrow / Retention Account Monitor 100%
(Moved from City Clerk &
General Services; now a
separate section under
General Services)
Budget Fiscal Year 2026 Page 29 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
One-Time Setup Per Account 350 361 11Monthly Maintenance Per Month 95 117 22 2 FN-015 Mello-Roos Bond Payoff Calculation Per Parcel 194 135 (59) 100% Plus any outside costs Current Fee Current Fee -
2 FN-016 Assessment Bond Payoff Processing Per Parcel 210 176 (34) 100% Plus any outside costs Current Fee -
2 FN-017 Mello-Roos Bond Payoff Processing Per Parcel 454 379 (75) 100% Plus any outside costs Current Fee -
5 FN-018 Special Assessment Foreclosure Administration Per Property 322 277 (45) 100% Plus County Administrative Fee Current Fee -Per Foreclosed Property Govt Code Sections 53356.2
5 FN-030 Returned Check Fee Per Check 41 43 2 100%
Per Government Code section 6157
2 FN-040 Check Reissuance Per Check 100%
Employee Payroll Check Request No Charge -
Individuals/Business Owners 62 77 15Corporations 70 77 7 3rd Party Request 101 112 11
2 FN-060 Financial Document Purchase Actual Cost Actual Cost Actual Cost - 100% Actual cost of document reproduction
2 FN-1005 Annexation into CFD 2016-1 Per Application 3,372 4,043 100% 671 Plus outside consultant actual cost Plus
Consultant Fee
Plus
Consultant Fee
-
2 FN-1010 Annexation into CFD 2016-3 Per Application 7,600 9,454 100% 1,854 Plus outside consultant actual cost
Plus
Consultant Fee
Plus
Consultant
Fee
-
FIRE DEPARTMENT
3 FR-020 Engine Company Reinspection
Per Each
Re-inspection $ 138 $ 140 $ 50% 2
5 FR-030 Fire False Alarm Response - Commercial / MFR Penalty Penalty Per Calendar Year:
3rd Response 575 575 -
Budget Fiscal Year 2026 Page 30 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
4th Response 575 575 -
5th & Subsequent Responses 575 575 -
Per CMC 8.30.170
5 FR-035 Fire False Alarm Response - SFR Penalty Penalty Per Calendar Year:
3rd response 575 575 -
4th response 575 575 -
5th & Subsequent Responses 575 575 -
Per CMC 8.30.170
2 FR-040 Emergency Incident Report Service Per Report Page 0.25 0.25 40 - 100% - Electronic Media Storage Copy Per Copy 2 2 -
Fee covered by the Public Records Act - see GS-10 General city copy charges 2 3 FR-060 Special Fire Permit Inspection Per Inspection 205 220 100% 15 Late Payment Fee - 30+ Days Penalty 75 75 Penalty -
2 3 FR-070 Fire Prevention Division Inspection Per Inspection 100% A1 & A4 Occupancies 305 320 15
A1 & A4 Occupancies - CUPA Program Discount 150 160 10
A2 & A3 Occupancies 190 200 10
A2 & A3 Occupancies - CUPA Program Discount 95 100 5
E Occupancies 1-100 Students 215 230 15
E Occupancies 1-100 Students - CUPA Program Discount 110 115 5 E Occupancies 101-999 Students 330 355 25
E Occupancies 101-999 Students - CUPA Program Discount 165 175 10 E Occupancies 1,000-3,000 Students 445 480 35
E Occupancies 1,000-3,000 Students - CUPA Program Discount 220 240 20E Occupancies 3,001+ Students 730 790 60 E Occupancies 3,001+ Students - CUPA Program Discount 365 395 30 I Occupancies (except I2) 330 355 25
I Occupancies (except I2) - CUPA Program Discount 165 175 10 I2 Occupancies 785 850 65
I2 Occupancies - CUPA Program Discount 395 425 30
B, M & U Occupancies 1-5,000 SF 160 170 10
B, M & U Occupancies 1-5,000 SF - CUPA Program Discount 80 85 5 B, M & U Occupancies 5,001-10,000 SF 215 230 15
B, M & U Occupancies 5,001-10,000 SF - CUPA Program Discount 110 115 5 B, M & U Occupancies 10,001+ SF 330 355 25
B, M & U Occupancies 10,001+ SF - CUPA Program Discount 165 175 10 F, H & S Occupancies 1-5,000 SF 215 230 15
F, H & S Occupancies 1-5,000 SF - CUPA Program Discount 110 115 5 F, H & S Occupancies 5,001-100,000 SF 330 355 25
Budget Fiscal Year 2026 Page 31 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
F, H & S Occupancies 5,001-100,000 SF - CUPA Program Discount 165 175 10 F, H & S Occupancies 100,001-300,000 SF 480 445 35
F, H & S Occupancies 100,001-300,000 SF - CUPA Program Discount 220 240 20 F, H & S Occupancies 300,001+ SF 600 555 45
F, H & S Occupancies 300,001+ SF - CUPA Program Discount 280 300 20 Multi-Family Residential - Housing Unit Fire Inspection Fees Per Calendar Year:
3-4 Units 275 255 20
3-4 Units - CUPA Program Discount 135 125 10
5-9 Units 495 480 15
5-9 Units - CUPA Program Discount 245 240 5
10-49 Units 710 650 60
10-49 Units - CUPA Program Discount 355 325 30
50-99 Units 1,025 935 90
50-99 Units - CUPA Program Discount 510 465 45
100-199 Units 1,400 1,280 120
100-199 Units - CUPA Program Discount 700 640 60
200-299 Units 1,585 1,445 140
200-299 Units - CUPA Program Discount 790 725 65
300-399 Units 1,770 1,615 155
300-399 Units - CUPA Program Discount 885 810 75
400-499 Units 1,960 1,785 175
400-499 Units - CUPA Program Discount 895 980 85
500-599 Units 2,070 2,270 200
500-599 Units - CUPA Program Discount 1,035 1,135 100600+ Units 2,585 2,830 245600+ Units - CUPA Program Discount 1,290 1,415 125 Per Health and Safety Code section 13146 standard
Multi-Family Residential - Housing Unit Fire Inspection Fees Per Calendar Year:
Common Area Fire Inspection 535 585 50
Common Area Fire Inspection - CUPA Program Discount 270 290 20 Per Health and Safety Code section 13146 standard
3 FR-075 Fire Prevention After Hours Inspection Per Hour at OT Rate
170 200 100% 30
3 FR-080 Fire Prevention Division Reinspection Per Hour 1st Inspection 115 125 100% 10
To promote compliance, fee can be waived at the discretion of the Fire Chief 2nd and Subsequent Inspections 130 135 5
3 FR-090 Hazardous Materials Disclosure Per Year 100%
Budget Fiscal Year 2026 Page 32 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 6 chemicals or less/5,000 sq ft or less 340 300 40
HazMat Disclosure Inspection - 6 chemicals or less/5,000 sq ft or less 115 155 40 HazMat review + inspection - 6 chemicals or less/5,000 sq ft or less 415 500 85 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 7-12 chemicals/5,001 - 10,000 sq ft 435 385 50
HazMat Disclosure Inspection - 7-12 chemicals/5,001 - 10,000 sq ft 140 185 45 HazMat review + inspection - 7-12 chemicals/5,001 - 10,000 sq ft 525 620 95 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 13-20 chemicals/10,001 sq ft or more 530 470 60
HazMat Disclosure Inspection - 13-20 chemicals/10,001 sq ft or more 170 220 50 HazMat review + inspection - 13-20 chemicals/10,001 sq ft or more 640 750 110 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 21-50 chemicals/10,001 sq ft or more 655 585 70
HazMat Disclosure Inspection - 21-50 chemicals/10,001 sq ft or more 225 280 55 HazMat review + inspection - 21-50 chemicals/10,001 sq ft or more 810 935 125 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 51-200 chemicals/10,001 sq ft or more 840 755 85
HazMat Disclosure Inspection - 51-200 chemicals/10,001 sq ft or more 285 340 55 HazMat review + inspection - 51-200 chemicals/10,001 sq ft or more 1,040 1,185 145HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 201 or more chemicals/10,001 sq ft or more 1,090 980 110
HazMat Disclosure Inspection - 201 or more chemicals/10,001 sq ft or more 340 405 65 HazMat review + inspection - 201 or more chemicals/10,001 sq ft or more 1 1,320 175 ,495 Late Payment Fee Penalty
30-60 Days 50% Penalty Based on Permit 170
Fee
-
Over 60 Days 100% Penalty Based on Permit 340
Fee
-
Plus Late Filing Fee if forms are not filed within 35 days Penalty 1st violation 100 100 -
2nd violation 200 200 -
3rd violation 500 500 -
Annual review is completed and inspection is conducted every three years 3 FR-100 Hazardous Materials Response Actual Cost Actual Cost Actual Cost - 100% Full costs for all responding city personnel, apparatus, equipment and materials 3 FR-120 State-Mandated Fire Pre-inspection of Care Facility Per Inspection 215 230 15 100% Per CA HSC 13235
3 FR-130 Alterations to Flammable and/or Combustible Liquid Tanks Per Inspection 100% First Tank 290 270 20
Each Additional Tank 95 85 10
Budget Fiscal Year 2026 Page 33 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 FR-140 Hazard / Weed Abatement Actual Cost Actual Cost Actual Cost - 100% Actual cost of clearing the lot plus City staff time at fully allocated hourly rate 5 FR-154 Field Inspection-Including but not limited to: Radio Test, Fuel Modification Inspection, Emergency System Repair Inspection
Per Inspection 125 140 15 100%
5 FR-155 Negligent Incident Response Actual Cost Actual Cost Actual Cost - 100% Charge the actual fully allocated cost of all personnel, apparatus, equipment, and materials, including specialized technical resources, such as arson dogs, engineers, lab technicians, or lab fees, up to state imposed limits. 5 FR-156 Property Sales Inspection Per Inspection 170 175 5 100% 3 FR-160 Counter Fire Permit Per Permit 40 50 10 100%
3 FR-170 Review of Fuel Modification Plan Per Review 1,470 1,690 220 100% Plus legal fees if City Attorney involved Full Cost Full Cost - 2 FR-200 Emergency Medical Services Response 0 - 10%
Subscription Program Per Year 60 60 -
Non-Subscribers Per Response 400 400 -
1/3 1/6 FR-250 New Sprinkler Plan Check / Inspection 100% Plan Check: Per Plan Check
1 - 100 Heads 475 490 15
101 - 500 Heads 535 570 35501+ Heads 595 645 50PC Phasing, each additional model, 1-100 heads 20% of PC Fee 105 98 (7) Inspection: Per 2 Inspections
1 - 100 Heads 615 625 10101 - 500 Heads 720 750 30501+ Heads 860 905 45 After 2nd Inspection - Original Fee
1 1/6 FR-255 FR-255 TI Sprinkler Plan Check / Inspection 100% Plan Check: Per Plan Check
1 - 20 Heads 315 330 1521 - 100 Heads 375 410 35101+ Heads 495 530 35PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
1 - 20 Heads 295 300 5
21 - 100 Heads 580 595 15
100+ Heads 720 715 (5)
After 2nd Inspection - Original Fee
Budget Fiscal Year 2026 Page 34 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 1/6 FR-257 Underground Fire Line Plan Check / Inspection 100% Plan Check: Per Plan Check
0 - 500 linear feet 420 450 30501 - 1,000 linear feet 540 570 30 1,000+ linear feet 660 725 65PC Phasing - separate fee for each fee based on the number of headsInspection: Per Inspection 0-500 linear feet 650 655 5
501-1,000 linear feet 935 905 (30)1,000+ linear feet 1,220 1,120 (100) After 2nd Inspection - Original Fee
1 1/6 FR-260 High Pile Storage Plan Check Per Plan Check 100% 0 - 500 square feet 360 370 10
501 - 2,500 square feet 420 450 30
2,501 - 20,000 square feet 480 530 5020,001 - 500,000 square feet 600 610 10500,001+ square feet 660 690 30 1 1/6 FR-270 Fire Alarm Plan Check / Inspection 100%
Plan Check: Per Plan Check
Over the Counter 240 255 15Standard 540 570 30PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
Over the Counter 260 300 40
Standard 470 485 15
Plus Each Device Over 9, per device 7 8 1
After 2nd Inspection - Original Fee
Waterflow Monitoring
Plan Check Per Plan Check 360 370 10
Inspection Per Inspection 330 355 25
1 1/6 FR-280 Fire Suppression System Plan Check / Inspection 100% Plan Check: Per Plan Check
Over the Counter 240 255 15Standard 360 370 10PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
Over the Counter 260 295 35
Standard 330 360 30
After 2nd Inspection - Original Fee
Budget Fiscal Year 2026 Page 35 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 FR-330 Public Service Lift and Assist Per Response 430 490 100% 60 2 FR-340 Medical Event Team (MET) - EMS Actual Cost Actual Cost Actual Cost - 100%2 FR-350 Juvenile Fire Setters Intervention Per Request 520 575 100% 55 2 FR-400 Inspection Cancellation Fee Penalty 125 125 Penalty - If cancellation occurs less than 24 hours of booked appointment 1 2 FR-410 Expired Permit / Extension Per Extension 120 140 100% 20 1 1 FR-420 Expedited Plan Check 1.5x Regular
Plan Check Fee
1.5x Regular
Plan Check Fee
1.5x Regular
Plan Check Fee
100% -
2 FR-430 Additional time for any other service not listed on fee schedule Actual Cost Actual Cost Actual Cost - 100%3 FR-440 Business License Fire Inspection Fee Flat Fee 150 160 10 100% Fee Discount / Waiver Notes: 1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
HUMAN RESOURCES
2 HR-010 Fingerprinting on Request Per Request 86 $ 100 $ 14 $ 100% Providing fingerprint service on request for employment or personal reasonsPlus State of California / Department of Justice Processing Fees
LEGAL AND RISK MANAGEMENT
2 LRM-010 Communication Site License Agreement Per Agreement $ 2,346 $ 2,412 $ 100% 66 2 LRM-020 Communication Site License Agreement Modification / Amendment Per Application 1,183 1,180 100% (3) 2 LRM-030 Communication Site License Agreement Minor Consent Letter Per Letter 340 416 100% 76 Fee may be waived in whole or in part at discretion of City Attorney/Legal & Risk Management Director. 2 LRM-040 Small Cell Site Master License Agreement Per Agreement 505 589 84 100% 2 LRM-050 Small Cell Site Modification / Amendment Per Amendment 466 539 73 100% 2 LRM-060 Small Cell Site Location Specific Supplement Per Supplement 438 516 78 100% City Manager has authority to waive in whole or in part pursuant to the terms of the applicable Small Cell Site Master License Agreement.
Budget Fiscal Year 2026 Page 36 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 LRM-070 City Attorney Office Review Actual Cost Actual Cost Actual Cost - 100%
PLANNING DIVISION
1 1 PL-BZ-010 Ancillary Game Arcade Review Flat Fee $ 1,391 $ 1,500 $ 100% 109 Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-030 Cul-de-Sac Waiver Flat Fee 857 834 100% (23) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-045 Conditional Use Permit - Minor Flat Fee 3,652 3,673 100% 21 Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-070 Model Home Permit Review Flat Fee 1,885 1,817 100% (68) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-080 Moved Building Review Flat Fee 3,324 3,373 100% 49 Plus Scanning Fee 67 64 (3)
Moved Historic Building Review at 50% of Fee 1,662 1,686.50 25Moved Historic Building Scanning Fee at 50% of Fee 34 32 (2) 1 1 PL-BZ-090 Non-Conforming Building Review Flat Fee 1,592 1,547 100% (45) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-100 Parcel Map Waiver Review Flat Fee 3,817 4,002 100% 185 Plus Scanning Fee 67 64 (3)
2 1 PL-BZ-130 Special Use Permit Flat Fee 100%
New 1,457 1,524 67
Renewal 578 1,095 517
1 1 PL-BZ-140 Medical Office in Residential Zone Review Flat Fee 1,473 1,857 100% 384 Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-150 Certificate of Compliance Review Flat Fee 3,159 3,128 100% (31) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-170 Tentative Tract Map Rephasing Review Flat Fee 2,662 2,843 100% 181 1 1 PL-BZ-180 Film Permit Review Flat Fee 1,121 1,385 100% 264 1 1 PL-BZ-190 Telecommunications Facilities Review Flat Fee 1,404 1,062 100% (342) Plus Scanning Fee 67 64 (3)
Plus per application if Maintenance Services is involved 137 256 119 Budget Fiscal Year 2026 Page 37 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 2 PL-BZ-200 Public Notice Fee for Minor CUPs Flat Fee 137 147 100% 10 11 PL-BZ-210 Noise Variance Per CMC Section 17.84.040(H) Flat Fee 1,767 1,892 100% 125 1 1 PL-CC-010 Agricultural Preserve Cancellation Flat Fee 2,265 4,755 100% 2,490 Plus Scanning Fee 67 64 (3)
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) 1 1 PL-CC-020 Amended Map Review Flat Fee 5,317 4,152 100% (1,165) Plus Scanning Fee 67 64 (3)
1 1 PL-CC-040 Density Bonus Agreement Review Flat Fee 3,003 3,749 100% 746 Plus Scanning Fee 67 64 (3)
1 1 PL-CC-070 Study Review
Deposit with Charges at Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
100% -
1 1 PL-CC-090 Historic Property Preservation Flat Fee 2,431 2,184 (247) 100% Plus Scanning Fee 64 67 (3)Plus Recording Fee for Land Current Fee Current Fee - 1 1 PL-DP-010 Minor Specific Plan Amendment DPR Flat Fee 3,852 4,354 502 100% 1 1 PL-DP-011 Major Specific Plan Amendment DPR Flat Fee 8,106 8,356 100% 2501 1 PL-DP-012 Specific Plan DPR Flat Fee 17,626 18,572 100% 9461 1 PL-DP-020 Tentative Tract Map DPR Base Fee 7,397 7,785 100% 388 Plus per Lot Per Lot 70 65 (5)
1 1 PL-DP-030 Parcel Map DPR Flat Fee 5,493 5,777 100% 284 1 1 PL-DP-050 Precise Plan or CUP for Multi-Family Residential Unit Development DPR - base fee Base Fee 6,566 5,685 100% (881) Plus per Dwelling Unit Per Dwelling Unit 20 43 23
1 1 PL-DP-060 Commercial / Industrial / All Other Plan DPR Flat Fee 5,177 5,459 100% 2821 1 PL-DP-070 Parcel Map / Tract Map Extension of Time DPR Flat Fee 2,811 2,903 100% 92 1 1 PL-DP-150 Extension of Time DPR Flat Fee 779 1,061 100% 2821 1 PL-DP-160 Precise Plan or CUP for Single Family Residential Unit Development - DPR Base Fee - 5,685 100% 5,685 Plus per Dwelling Unit fee Per Dwelling Unit - 43 43
Budget Fiscal Year 2026 Page 38 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 1 PL-DP-170 Senate Bill 6 Housing Development (Precise Plan or Conditional Use Permit) - DPR Base Fee - 5,685 100% 5,685 Plus Per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-DP-180 Assembly Bill 2011 Housing Development - DPR Base Fee - 5,685 100% 5,685 Plus Per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-DP-190 Senate Bill 330 Preliminary Application - Housing Development (Precise Plan or Conditional Use Permit)
Base Fee - 5,685 100% 5,685
Plus Per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-DP-200 Senate Bill 330 Preliminary Application - Tentative Tract Map Base Fee - 7,785 100% 7,785 Plus Per Lot Fee Per Lot Fee - 65 65Senate Bill 330 Preliminary Application - Parcel Map Base Fee 5,777 5,777 1 1 PL-DP-210 Senate Bill 330 Preliminary Application - Specific Plan Flat Fee - 18,572 18,572 100% PL-DP-220 Senate Bill 330 Preliminary Application - Major Specific Plan Amendment Flat Fee - 8,356 100% 8,356 1 1 Senate Bill 330 Preliminary Application - Major Specific Plan Amendment Flat Fee - 4,354 4,354 1 1 PL-DP-230 Affordable Housing Overlay Residential Development - DPR Base Fee - 5,685 100% 5,685 Plus per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-MS-010 Banner Review Flat Fee 67 64 100% (3)1 3 PL-MS-020 Garage Sale Permit Flat Fee 10 10 15% - Up to 3 Days
1 6 PL-MS-060 Promotional Construction Sign Permit Review Flat Fee 67 64 100% (3) 1 1 PL-MS-080 Sign Permit Review Flat Fee 100 96 100% (4) 1 2 PL-MS-100 Title Company Zoning Letters Flat Fee 282 282 100% - Per Request
1 1 PL-MS-140 Sign Reface Review Flat Fee 33 32 100% (1)1 1 PL-MS-150 Substantial Conformance Review Flat Fee 2,078 2,260 100% 182 1 1 PL-MS-160 Minor Modification (Precise Plan) Flat Fee 1,662 1,652 100% (10) Plus Scanning Fee 67 64 (3)
1 3 PL-MS-170 Code Enforcement Re-inspection Flat Fee 311 304 100% (7) Per inspection for every inspection after the first two inspections 1 1 PL-MS-175 Public Notice Sign Processing Flat Fee 158 36 100% (122) Budget Fiscal Year 2026 Page 39 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Per Application
1 1 PL-MS-180 Digitized Mapping Flat Fee 100%
Per Acre - Less than 50 Acres 279 294 (15)Per Acre - 50 Acres or More 667 702 (35) 1 1 PL-MS-190 Scanning Services Flat Fee 67 64 (3) 100% Scanning the plans and maps of new development
1 1 PL-MS-200 General Plan Maintenance 5% of Bldg
Permit Fee
5% of Bldg
Permit Fee
5% of Bldg
Permit Fee
100% -
1 1 PL-MS-210 Cottage Food Industry Permit Flat Fee 67 64 100% (3)1 1 PL-MS-220 Planning Director Modification Flat Fee 1,380 1,412 100% 32 CMC 16.12.070 - non substantive change in COA
1 1 PL-MS-250 Surface Mine Annual Inspections Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
100% -
1 1 PL-MS-260 Low Barrier Navigation Center Flat Fee 561 1,299 100% 7381 1 PL-PC-010 Annexation Request Review Deposit + Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-015 Community Facility Plan Amendment Flat Fee 5,155 7,773 100% 2,618 Plus Scanning Fee 67 64 (3)Plus Cost of Legal Ad Current Fee Current Fee - 1 1 PL-PC-020 Architectural Review Flat Fee 3,294 3,076 100% (218) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-030 Change of Zone Review Flat Fee 6,700 6,443 100% (257) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-040 Conditional Use Permit - Major Flat Fee 8,655 8,390 (265) 100% Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-050 Modification to Major CUP Flat Fee 5,030 4,932 100% (98) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - Budget Fiscal Year 2026 Page 40 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 1 PL-PC-060 Development Agreement Review Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-065 Environmental Categorial Exemption Flat Fee 336 228 100% (108) 1 1 PL-PC-070 Environmental Impact Assessment - Negative Declaration or Mitigated Negative Declaration Plus Technical Studies Review
Flat Fee 9,036 Deposit
+ Full Cost
100% -
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-075 Environmental Impact Report Review - Deposit + Full Cost
100%
Deposit set at 30% of contract amount with charges at full cost Deposit + Full Cost
Deposit
+ Full Cost
-
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-080 General Plan Amendment Review Base Fee 8,842 8,428 100% (414) Plus per Acre Per Acre 20 229 209
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-110 Residential Parcel Map Review Flat Fee 6,870 6,832 100% (38) Plus Scanning Fee 67 64 (3)Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-120 Commercial / Industrial Parcel Map Review Flat Fee 8,373 8,280 100% (93) Plus Scanning Fee 67 64 (3)Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-150 Precise Plan Review Base Fee 9,334 9,242 100% (92) Plus per Dwelling Unit Per
Dwelling Unit
20 17 (3)
Plus Scanning Fee 67 64 (3)Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-160 Precise Plan Modification Review Base Fee 6,519 6,332 100% (187) Plus per Dwelling Unit Per
Dwelling Unit
20 17 (3)
Plus Scanning Fee 67 64 (3)Plus Cost of Legal Ad Current Fee Current Fee - Budget Fiscal Year 2026 Page 41 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 1 PL-PC-170 Reversion to Acreage Flat Fee 7,737 7,927 100% 190 Plus Scanning Fee 67 64 (3)
1 1 PL-PC-180 Similar Use Review Flat Fee 2,648 2,521 100% (127) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-190 Specific Plan Review - deposit with charges at full cost Deposit + Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-200 Specific Plan Amendment Review - minor revision Flat Fee 100% Minor Revision 6,059 5,842 (217)
Major Revision 9,935 10,425 490Plus Scanning Fee 67 64 (3) Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-230 Sphere of Influence Amendment Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-240 Surface Mining Permit Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-245 Surface Mining Reclamation Plan
Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35)Plus Scanning Fee 67 64 (3) 1 1 PL-PC-250 Tentative Tract Map Review Base Fee 12,227 12,273 100% 46 Plus per Lot Per Lot 49 43 (6)
Plus Scanning Fee 67 64 (3)
Budget Fiscal Year 2026 Page 42 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-270 Resubmitted Parcel Map Flat Fee 5,713 5,796 83 100% Plus Scanning Fee 64 67 (3)
1 1 PL-PC-280 Resubmitted Tract Map Review Base Fee 6,804 6,787 (17) 100% Plus per Lot Per Lot 49 43 (6)Plus Scanning Fee 64 67 (3) Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-290 Major Variance Review Base Fee 6,389 5,950 (439) 100% Plus per Lot Per Lot 28 23 (5)Plus Scanning Fee 64 67 (3) Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-300 Waiver or Modification Review Flat Fee 2,807 3,033 226 100% 1 1 PL-PC-310 Zone Text Amendment Review Flat Fee 6,273 5,891 (382) 100% Plus Scanning Fee 64 67 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-340 Appeal to the Planning Commission Flat Fee 3,865 3,669 (196) 100% 1 1 PL-PC-350 Extension of Time - PP Flat Fee 2,703 2,736 33 100% 1 1 PL-PC-360 Extension of Time - CUP Flat Fee 2,703 2,736 33 100% 1 1 PL-PC-370 Historic Resource Nomination Flat Fee 300 300 - 8% Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-380 Deletion or Reduced Listing of Historic Resources Flat Fee 3,896 4,455 100% 559 1 1 PL-PC-390 Major Alteration, Relocation, or Demolition of Historic Districts & Landmarks, Including Demolitions of Heritage Properties
Flat Fee 4,172 4,305 133 100%
1 1 PL-PC-400 Historic Structure of Merit Nominations Flat Fee 300 300 - 8% Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-ZA-010 Alcoholic Beverage Application Review Flat Fee 1,126 1,006 100% (120) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-060 Minor Variance Review Flat Fee 2,698 2,439 100% (259) Plus Scanning Fee 67 64 (3)
Budget Fiscal Year 2026 Page 43 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 1 PL-ZA-070 Parking Determination Review Flat Fee 2,440 1,664 100% (776) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-080 Commercial / Industrial Freeway Sign Review Flat Fee 1,461 1,253 100% (208) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-090 Temporary Use Permit Flat Fee 67 64 100% (3) 1 1 PL-ZA-100 Zoning Administrator Application Flat Fee 1,461 1,253 100% (208) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-120 Adult Use Planning Permit Flat Fee 6,672 7,313 100% 641 Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-130 Minor Modifications to Telecommunication Facilities Flat Fee 863 742 100% (121)1 1 PL-ZA-140 Donation Collection Container Permit Flat Fee 268 145 100% (123)1 1 PL-ZA-150 Smoking Lounges Ancillary Use Application Fee Flat Fee 532 1,187 100% 655 1 PL-CB-010 Commercial Cannabis Permit - Storefront Retailer Flat Fee + Actual
11,427 9,386 100% (2,041)
Plus pro rata share of actual cost of Independent Facilitator for Merit-Based Evaluation Process (Actual Cost / Number of Applicants)
Actual Cost Actual Cost -
1 PL-CB-020
Commercial Cannabis Permit – Non-storefront Retailer/Manufacturing / Distribution / Testing Laboratory Flat Fee 10,443 8,322 100% (2,121)
1 PL-CB-030 Commercial Cannabis Permit – Annual Renewal Flat Fee 2,180 3,761 100% 1,5815 PL-CB-040 Commercial Cannabis Permit – Annual Renewal Late Fee Flat Fee 100% 45-59 days prior to permit expiration 473 473 - 30-44 days prior to permit expiration 945 945 - 15-29 days prior to permit expiration 1,418 1,418 - 14 days or less prior to permit expiration 1,890 1,890 - 1 PL-CB-050 Commercial Cannabis - Request for Premises Modification Flat Fee 1,834 2,120 286 100% 1 PL-CB-060 Commercial Cannabis – Transfer of Less than Majority Ownership Flat Fee 1,974 2,774 100% 800 1 PL-CB-070 Commercial Cannabis – Change in Name or Form of Business Entity Flat Fee 925 928 100% 3 1 PL-CB-080 Commercial Cannabis – Change of Premises Location Flat Fee 3,720 4,137 100% 417 1 PL-CB-090 Commercial Cannabis – Background Check Flat Fee 128 160 32 100% Plus Current Department of Justice Fee Actual Cost Actual Cost - Budget Fiscal Year 2026 Page 44 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1 PL-CB-100 Commercial Cannabis – Employee Identification Badge Replacement Flat Fee 37 39 2 100% 1 PL-FF-010 Feather Flag Permit Per Permit 67 42 (25) 100% 1 PL-SS-010 Sidewalk Vendor Permit Per Permit 100%
Application Fee 42 67 (25)
1 PL-SS-020 Solicitor Permit Per Permit 100%
Application Fee 42 67 (25)
1 PL-SS-030 Vehicle Impound / Store / Release Per Request 100% Sidewalk Vending Receptacles, Food and Merchandise 275 284 9 1 PL-SS-040 Outdoor Sidewalk Dining Permit Per Permit 307 280 (27) 100% Plus Scanning Fee
1 PL-SS-050 Outdoor Retail Kiosk Permit Per Permit 167 130 (37) 100% Plus Scanning Fee
Fee Discount / Waiver Notes: 1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
POLICE DEPARTMENT AND ANIMAL CONTROL
3 PO-010 Animal Regulation 30 - 100%
Unaltered Dog License Penalty Penalty
1 Year Per License
Annually
$ 100 100 $ -$
Altered Dog License
1 Year Per License
Annually
15 15 -
2 Years Per License
Every 2 Years
25 25 -
3 Years Per License
Every 3 Years
35 35 -
Dog License - Income Qualified rate Per License
Annually
10 10 -
Service Dog License No Charge No Charge No Charge -Potentially Dangerous or Vicious Dog License Per Year 150 150 - Late Registration Penalty
30-60 Days Penalty 25 25 -
Over 60 Days Penalty 50 50 -
Replacement Tag Per Tag 5 5 -
Budget Fiscal Year 2026 Page 45 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 PO-011 Owner Requested Rabies Analysis Per Request 145 145 100% - Plus Current Health Department Fee Current Fee Current Fee - 2 PO-012 Owner Requested Vicious Animal Pickup Per Pickup 175 175 100% - 3 PO-013 Wild or Exotic Animal Permit Per Permit 170 170 100% - 3 PO-014 Chicken License Per License 115 115 80% -
3 PO-017 Pet Home Quarantine Per Quarantine 98%
Home 80 80 - Customs 80 80 -
3 PO-019 Animal Shelter Impound and Redemption 10 - 100% Impound - 1st Occurrence Per Impound 50 50 -
Impound - 2nd Occurrence Penalty 100 100 - Penalty
Impound - 3rd and Subsequent Occurrences Penalty 150 150 - PenaltyImpound - Income Qualified 50% of Fee 25 - (25)Livestock Impound Actual Cost Actual Cost Actual Cost - 3 PO-020 Administrative Animal Citation Sign-off Per Citation 40 40 35% - Plus actual processing costs of third party vendor
3 PO-023 Animal Boarding Per Day 25 25 100% -
Per Diem/Board of AnimalsNo income qualified rate
3 PO-024 Animal Adoption Processing Per Adoption 75 75 0 - 100% - For Animals in Shelter Longer than 30 Days 45 45 -
Microchipping - Owner request Per Microchip 25 25 -
4 PO-025 Animal Trap Rental Rental Deposit
Deposit per Trap Deposit Deposit -Plus $5 per day charged against deposit for traps not returned by the due date 5 5 - 2 PO-026 Owner Request of Animal Pickup Per request 100 100 67% -2 PO-027 Owner Animal Signoff at Shelter - Income Qualified Per Animal 75 - (75) 75 - 85% Owner Euthanasia Request 100 90 10Owner Surrender (Includes 3 days boarding) 150 115 35 2 PO-028 Owner Transported Deceased Animal Disposal Per Disposal 45 45 - 100% 3 PO-029 Spay/Neuter Processing Actual Cost Actual Cost Actual Cost - 100% Budget Fiscal Year 2026 Page 46 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Income Qualified 50% of Actual Cost 50% of
Actual Cost
50% of
Actual Cost
-
The State of California requires that all adopted animals be surgically sterilized prior to leaving the shelter 3 PO-031 Spay / Neuter Penalty for Impounded Animal Penalty Penalty / Set by State
1st Occurrence 35 35 - 2nd Occurrence 50 50 - 3rd and Subsequent Occurrences 100 100 - Fees Set by State
2 PO-060 DUI Collision Response, Arrest, and Processing Actual Cost Actual Cost Actual Cost - 100% DUI Incident Documentation Per Incident 457 593 136
2 PO-080 Verification / Clearance Forms / Letters Per Letter 27 33 6 100% 2 PO-081 Vehicle Verification Service Per Request 138 177 39 100% 2 PO-082 Citation Sign-off Service Per Citation 51 64 13 100% Per Vehicle Outside Jurisdiction
2 PO-085 Vehicle Impound / Release Service Per Request 249 319 70 100% 2 PO-105 Photo Reproduction - Digital Per Copy 4 3 1 100% 2 PO-110 Police Report / Document Reproduction 100%
Per Report Page Per Page 0.25 0.25 -
Electronic Media Storage Copy Per Copy 2 2 -
Fee covered by the Public Records Act - see GS-10 General city copy charges 5 PO-120 Police False Alarm Response / Billing - Per Calendar Year Penalty Penalty Permitted Alarm
1st Response No Charge No Charge -
2nd Response No Charge No Charge -3rd Response 80 80 - 4th Response 240 240 - 5th and Subsequent Responses 320 320 -
Non-Permitted Alarm
1st Response (waived if permit paid within 30 days) 80 80 - 2nd Response (reduced to $60 if permit paid within 30 days) 120 120 - 3rd Response 240 240 - 4th Response 320 320 -
5th and Subsequent Responses 400 400 -
Budget Fiscal Year 2026 Page 47 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
3 PO-125 Police Alarm Permit - new application Per Permit 100% New Application 45 45 -
3 PO-126 Police Alarm Permit Renewal Per Annual Renewal 100% Residential 25 25 - Commercial 27 27 -
3 PO-132 Bingo Permit Per Permit 50 50 80% -
Plus Current Department of Justice Fee Current Fee Current Fee - 3 PO-133 Entertainment Permit Per Permit 100%
New Application 337 462 125
Annual Renewal 274 395 121Plus Current Department of Justice Fee Current Fee Current Fee - 3 PO-134 Massage Establishment Permit 70 - 100%
New Per 2-Year
Permit
562 758 196
Renewal Per Renewal 231 400 169
Plus Current Department of Justice Fee Current Fee Current Fee - Testing fee (Retest only) 100 100 -
1 PO-135 Miscellaneous / Solicitor's Police Permits Per Permit 236 247 100% 11 Plus Current Department of Justice Fee, if applicable Current Fee Current Fee - 1 PO-136 Firearms Dealer Permit
New Application Per Permit 353 409 100% 56
Annual Renewal Per Renewal 137 395 258
Plus Current Department of Justice Fee Current Fee Current Fee - 1 PO-137 Fortuneteller Permit Per Permit 278 202 100% (76) Plus Current Department of Justice Fee Current Fee Current Fee - 1 PO-138 Secondhand Dealer / Pawn Shop permit Per Permit 87 169 100% 82 Plus Current Department of Justice Fee Current Fee Current Fee - 3 PO-145 Curfew Violation Citation Citation
1st Offense 100 100 -
2nd Offense 200 200 -
3rd Offense 500 500 -
1 PO-150 Special Event Police Service Per Hour at OT Rate 194 194 100% - 1 PO-151 Police Special Event Permit Application Per Permit 81 80 100% (1) Non-Profit No Charge No Charge - -
Budget Fiscal Year 2026 Page 48 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Non Profit Discount Per Permit 50% discount of -
permit fee
Late Application Penalty 50 - 50
Carnival/Festival/Fair - Background Check Fee Actual Cost - - 2 PO-160 Police Dispatch Copy Per Copy 47 58 100% 11
Full cost includes time not eligible for recovery under PRA. Only direct copy cost can be charged. 2 PO-161 Police Recorded Media Copy Per Copy 58 47 11 100% Full cost includes time not eligible for recovery under PRA. Only direct copy cost can be charged. 2 PO-170 Auto Repossession Processing Set by State 15 15 - Set by State 3 PO-180 Special Response Team Call-Out Actual Cost Actual Cost Actual Cost - 100%3 PO-190 Non-Consensual Tow Company Administrative Fee Per Request 1,042 1,361 100% 319 Minimum 5-Year Agreement
3 PO-195 Authorized Towing Contractor Audit Actual Cost Actual Cost Actual Cost - 100%2 PO-200 Booking Fee Actual Cost Actual Cost Actual Cost - 100% 3 PO-215 Crime Analysis Research Actual Cost Actual Cost Actual Cost - 100%2 PO-220 Neighborhood Watch Sign Actual Cost Actual Cost Actual Cost - 100% 5 PO-225 Police Permit Per Permit
Late Penalty: 30-60 days 50 50 -Late Penalty: Over 60 days 75 75 - *For the purpose of "Income Qualified" the following must be met:1. Be responsible for payment of the fee.PUBLIC WORKS 2 PW-320 Traffic Study Review Flat Fee 100%
Memo $ 1,502 $ 1,815 $ 313
Site Specific 3,490 4,446 956
Regional 7,806 9,679 1,873
3 2 PW-1015 Traffic Control Plan Review Flat Fee 100%
Preliminary Review (MUTCD/WATCH) 106 143 37
Minor with Plans (Utility) 831 1,084 253
2. Have a household income of not more than the minimum amount set forth in Section 20514 of the Revenue and Taxation Code, regardless of the person's age. To obtain the income qualified rate, qualifying persons shall Budget Fiscal Year 2026 Page 49 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Major - TCP (1-5 sheets) 2,062 1,567 495
Major - TCP (6-20 sheets) 4,409 3,380 1,029
Major - TCP (>20 sheets) 7,663 5,944 1,719
3 PW-1016 NPDES Permit Per Inspection 100%
Stormwater Commercial Facility Inspection (Low, Medium, & High Priority) 321 - 321
Stormwater Commercial Facility Follow-up Inspection (Low, Medium, & High priority) - 208 208
Stormwater Industrial Facility Inspection (Low, Medium, & High priority) - 411 411
Stormwater Industrial Facility Follow -up Inspection (Low, Medium, & High priority) - 265 265
Stormwater Construction Site Inspection (Low, Medium, & High priority) - 360 360
Stormwater Construction Site Follow-up Inspection (Low, Medium, & High priority) - 276 276
Stormwater Water Quality Management Plan for Post-Construction BMP Inspection - 360 360
Stormwater Water Quality Management Plan for Post-Construction BMP Follow -up Inspection - 225 225
Fee Discount / Waiver Notes:
1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A33. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).
UTILITIES DEPARTMENT
5 UD-010 Delinquent Fee 10% of Past Due
Amount
10% of Past Due
Amount
10% of Past Due
Amount
Penalty -
2 UD-020 Disconnection Fee - Water Turn On/Turn Off Flat Fee 53 $ 57 $ 4 $ 100% Disconnection Fee - Electric Turn On/Turn Off Flat Fee 278 252 (26) 2 UD-030 New Account Set Up Fee Flat Fee 26 29 100% 3
Any Additional Meter Flat Fee 12 9 (3)
Plus Electric Turn On Flat Fee 12 13 1
5 UD-040 Final Notice Fee Penalty 34 34 Penalty -
2 UD-050 After-Hours Service Fee Flat Fee 116 114 100% (2) Budget Fiscal Year 2026 Page 50 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 UD-060 Damages Flat Fee 100%
Lock 18 24 6
Pull/Reinstall Meter 243 202 (41)
2 UD-070 Hydrant Meter Relocation Flat Fee 305 150 100% (155)2 UD-080 Potable Construction Meter Deposit 3" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 3" Actual Cost Actual Cost Actual Cost -Potable Construction Water Deposit 3" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 3" Flat Fee 480 306 (174) 2 UD-090 Potable Construction Meter Deposit 4" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 4" Actual Cost Actual Cost Actual Cost -Potable Construction Water Deposit 4" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 4" Flat Fee 480 350 (130) 2 UD-100 Potable Construction Meter Deposit 6" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 6" Actual Cost Actual Cost Actual Cost -Potable Construction Water Deposit 6" Deposit Calculated Cost
Calculated
Cost -
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 6" Flat Fee 480 350 (130) 2 UD-110 Potable Construction Meter Deposit 8" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 8" Actual Cost Actual Cost Actual Cost -Potable Construction Water Deposit 8" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 8" Flat Fee 480 350 (130) 2 UD-120 Reclaimed Construction Meter Deposit 3" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 3" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + (100 units x Current Commodity Rate) Reclaimed Construction Meter Installation and Removal Fee 3" RW Flat Fee 412 421 9 2 UD-130 Reclaimed Construction Meter Deposit 4" Actual Cost Actual Cost Actual Cost - 100% Budget Fiscal Year 2026 Page 51 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Reclaimed Construction Water Deposit 4" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + (100 units x Current Commodity Rate) Reclaimed Construction Meter Installation and Removal Fee 4" RW Flat Fee 412 485 73 2 UD-140 Reclaimed Construction Meter Deposit 6" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 6" Deposit Calculated Cost
Calculated
Cost -
Ready to Serve Charge + (100 units x Current Commodity Rate) Reclaimed Construction Meter Installation and Removal Fee 6" RW Flat Fee 412 485 73 2 UD-150 Reclaimed Construction Meter Deposit 8" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 8" Ready to Serve Charge + (100 units x Current Commodity Rate) Deposit Calculated
Cost
Calculated
Cost
-
Reclaimed Construction Meter Installation and Removal Fee 8" RW Flat Fee 412 485 73 2 UD-175 Reduce Meter Size/Relocate Meter to an Existing Service 1" or smaller Flat Fee 118 136 100% 18 Reduce Meter Size/Relocate Meter to an Existing Service Over 1" 118 136 18 2 UD-190 New Water Meter Set Up and Installation Flat Fee + Actual Cost
242 230 100% (12)
Plus Cost of Meter
Water Meter Fee 5/8" Actual Cost Actual Cost -
Water Meter Fee 3/4" Actual Cost Actual Cost -
Water Meter Fee 1" Actual Cost Actual Cost -
Water Meter Fee 1 1/2" Actual Cost Actual Cost -
Water Meter Fee 2" Actual Cost Actual Cost -
Water Meter 3" & Larger Actual Cost Actual Cost -
2 UD-200 New Reclaimed Water Meter Set Up and Installation Plus Cost of Meter
Flat Fee
+ Actual Cost
242 335 100% 93
Reclaimed Water Meter Fee 5/8" Actual Cost Actual Cost - Reclaimed Water Meter Fee 3/4" Actual Cost Actual Cost - Reclaimed Water Meter Fee 1" Actual Cost Actual Cost -
Reclaimed Water Meter Fee 1 1/2" Actual Cost Actual Cost - Reclaimed Water Meter Fee 2" Actual Cost Actual Cost -
Reclaimed Water Meter Fee 3" & Larger Actual Cost Actual Cost - 2 UD-210 Pretreatment Program Application Review Flat Fee 100% Class 1 3,105 3,329 224
Class 2 2,144 2,289 145
Class 3 1,182 1,216 34
Class 4 1,140 1,184 44
Class 5 1,182 1,216 34
Class 6 597 631 34
Budget Fiscal Year 2026 Page 52 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 UD-220 Pretreatment Program Annual Permit Fee
Plus Sampling & Analysis Costs
Flat Fee
+ Actual Cost
100%
Class 1 2,381 1,380 1,001Class 2 1,536 1,380 156Class 3 1,536 1,380 156Class 4 1,471 1,265 206Class 5 1,341 1,035 306Class 6 496 555 (59) 2 UD-230 Pretreatment Program Noncompliance Inspection Flat Fee 100% Class 1 721 696 25
Class 2 721 696 25Class 3 721 696 25Class 4 721 696 25Class 5 721 696 25Class 6 721 696 25 2 UD-240 Pretreatment Program Noncompliance Sampling/Analysis Plus Sampling & Analysis Costs
Flat Fee
+ Actual Cost
949 1,201 (252) 100%
2 UD-250 Pretreatment Program Grease Interceptor Monitoring Flat Fee 250 203 (47) 100% 5 UD-260 Pretreatment Program Minimum Penalties Penalty Penalty Stop Work Order 500 500 -
Compliance Order 1,000 1,000 -
Consent Order 500 500 -
Cease and Desist Order 1,000 1,000 - Show Cause Hearing 1,500 1,500 - 2 UD-270 Lost/Stolen/Damaged Backflow Device
Plus Backflow and Materials Costs
Flat Fee
+ Actual Cost
546 468 100% (78)
2 UD-280 Refundable Deposit Deposit of 3x
Average Bill
Deposit of
3x Average Bill
Deposit of
3x Average Bill
100% -
2 UD-285 Damages Cage - Water
Plus Actual Cost of Cage
Flat Fee
+ Actual Cost
591 758 (167) 100%
2 UD-286 Lost/Stolen Chain - Water Flat Fee 264 166 (98) 100% 2 UD-290 Lost/Stolen Meter Actual Costs Actual Costs Actual Costs - 100%2 UD-300 Meter Damages/Replacement Actual Costs Actual Costs Actual Costs - 100% 2 UD-310 Prepare Disinfection Plan Flat Fee 847 1,159 312 100% Budget Fiscal Year 2026 Page 53 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 UD-320 Fire Set Up Fee Flat Fee 70 79 100% 9
2 UD-330 House Laterals, Sewers - Maintenance Actual Costs Actual Cost Actual Cost - 100% 2 UD-340 Water Meter Upgrades/Downgrades Flat Fee
+ Actual Cost
704 459 100% (245)
Plus Meter Installation 122 48 (74)
Plus Actual Cost of Meter
Plus Meter box Installation: Grass/Dirt (if meter box needs replacement and is not in concrete) 473 427 46
Plus Actual Cost of Meter Box
Plus Meter Box Installation Deposit: Concrete (if meter box needs replacement and is in concrete) Actual Cost -
Plus Actual Cost of Meter Box
2 UD-350 Electrical Building Plan Reviews Flat Fee
+ Deposit
243 220 23 100%
Plus Deposit for Actual Cost of Outside Plan Review
2 UD-360 Public Electrical Plan Processing Flat Fee
+ Deposit
2,220 2,079 141 100%
Plus Deposit for Actual Cost of Outside Plan Review
2 UD-370 Solar Review Fee Flat Fee 866 964 100% 98
Plus deposit for Initial Review (for non-net energy metering only) Plus deposit for Supplemental review, if applicable (for non-net energy $2,000
Deposit
$2,000
Deposit
-
metering only) $600
Deposit
$600
Deposit
-
2 UD-390 GIS Utility Update Flat Fee 504 587 83 100%
Per Plan Sheet and Per Utility
2 UD-400 Collection Fee Flat Fee 41 - (41) 100%2 UD-410 Miscellaneous Service Deposit Deposit Deposit Deposit - 100% 2 UD-420 Meter Testing Flat Fee 142 147 100% 5
2 UD-430 Backflow Prevention Flat Fee 76 89 100% 13
($76 annual /
$6.33 month)
($89 annual /
$7.42 month)
2 UD-450 Frontage Fee Reimbursement Actual Cost Actual Cost Actual Cost - 100% Budget Fiscal Year 2026 Page 54 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
2 UD-460 Temporary Power Actual Cost Actual Cost Actual Cost - 100% 2 UD-470 Unscheduled Service Fee Flat Fee - 14 100% 14
Budget Fiscal Year 2026 Page 55 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
A-1 Theater 1,000 s.f. I-A, I-B, II-A $ 8,479.05 9,715.20 1,236.15 $ 1,890.89 $ 2,238.00 $ 347.11 A-1 Theater 1,000 s.f., II-B, III-A, V-A 7,065.87 8,096.00 1,030.13 1,575.74 1,865.00 289.26 A-1 Theater 1,000 s.f. III-B, IV, V-B 5,652.70 6,476.80 824.10 1,260.59 1,492.00 231.41 A-1 Theater 5,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 3,781.78 4,476.00 694.22 A-1 Theater 5,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 3,151.48 3,730.00 578.52 A-1 Theater 5,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 2,521.18 2,984.00 462.82 A-1 Theater 10,000 s.f. I-A, I-B, II-A 13,741.91 15,746.40 2,004.49 6,429.02 7,610.40 1,181.38 A-1 Theater 10,000 s.f. II-B, III-A, V-A 11,451.59 13,122.00 1,670.41 5,357.52 6,342.00 984.48 A-1 Theater 10,000 s.f. III-B, IV, V-B 9,161.27 10,497.60 1,336.33 4,286.01 5,073.60 787.59 A-1 Theater 20,000 s.f. I-A, I-B, II-A 15,788.57 18,092.40 2,303.83 9,265.35 10,968.00 1,702.65 A-1 Theater 20,000 s.f. II-B, III-A, V-A 13,157.15 15,077.00 1,919.85 7,721.13 9,140.00 1,418.87 A-1 Theater 20,000 s.f. III-B, IV, V-B 10,525.72 12,061.60 1,535.88 6,176.90 7,312.00 1,135.10 A-1 Theater 50,000 s.f. I-A, I-B, II-A 20,174.29 23,118.00 2,943.71 11,156.24 13,207.20 2,050.96 A-1 Theater 50,000 s.f. II-B, III-A, V-A 16,811.91 19,265.00 2,453.09 9,296.87 11,006.00 1,709.13 A-1 Theater 50,000 s.f. III-B, IV, V-B 13,449.53 15,412.00 1,962.47 7,437.49 8,804.80 1,367.31 A-1 Theater 100,000 s.f. I-A, I-B, II-A 28,068.58 32,163.60 4,095.02 13,236.22 15,669.60 2,433.38 A-1 Theater 100,000 s.f. II-B, III-A, V-A 23,390.48 26,803.00 3,412.52 11,030.18 13,058.00 2,027.82 A-1 Theater 100,000 s.f. III-B, IV, V-B 18,712.38 21,442.40 2,730.02 8,824.14 10,446.40 1,622.26 A-2 Nightclub 1,000 s.f. I-A, I-B, II-A 7,894.29 9,045.60 1,151.31 1,512.71 1,790.40 277.69 A-2 Nightclub 1,000 s.f. II-B, III-A, V-A 6,578.57 7,538.00 959.43 1,260.59 1,492.00 231.41 A-2 Nightclub 1,000 s.f. III-B, IV, V-B 5,262.86 6,030.40 767.54 1,008.47 1,193.60 185.13 A-2 Nightclub 5,000 s.f. I-A, I-B, II-A 12,864.76 14,740.80 1,876.04 3,214.51 3,805.20 590.69 A-2 Nightclub 5,000 s.f. II-B, III-A, V-A 10,720.64 12,284.00 1,563.36 2,678.76 3,171.00 492.24 A-2 Nightclub 5,000 s.f. III-B, IV, V-B 8,576.51 9,827.20 1,250.69 2,143.01 2,536.80 393.79 A-2 Nightclub 10,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 5,672.66 6,715.20 1,042.54 A-2 Nightclub 10,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 4,727.22 5,596.00 868.78 A-2 Nightclub 10,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 3,781.78 4,476.80 695.02 A-2 Nightclub 20,000 s.f. I-A, I-B, II-A 15,788.57 18,092.40 2,303.83 7,941.73 9,400.80 1,459.07 A-2 Nightclub 20,000 s.f. II-B, III-A, V-A 13,157.15 15,077.00 1,919.85 6,618.11 7,834.00 1,215.89 A-2 Nightclub 20,000 s.f. III-B, IV, V-B 10,525.72 12,061.60 1,535.88 5,294.49 6,267.20 972.71 A-2 Nightclub 50,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 9,454.44 11,192.40 1,737.96 A-2 Nightclub 50,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 7,878.70 9,327.00 1,448.30 A-2 Nightclub 50,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 6,302.96 7,461.60 1,158.64 A-2 Nightclub 100,000 s.f. I-A, I-B, II-A 27,776.20 31,828.80 4,052.60 12,290.77 14,550.00 2,259.23 A-2 Nightclub 100,000 s.f. II-B, III-A, V-A 23,146.83 26,524.00 3,377.17 10,242.31 12,125.00 1,882.69 A-2 Nightclub 100,000 s.f. III-B, IV, V-B 18,517.46 21,219.20 2,701.74 8,193.85 9,700.00 1,506.15 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. I-A, I-B, II-A 9,648.57 11,055.60 1,407.03 1,701.80 2,013.60 311.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. II-B, III-A, V-A 8,040.48 9,213.00 1,172.52 1,418.17 1,678.00 259.83 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. III-B, IV, V-B 6,432.38 7,370.40 938.02 1,134.53 1,342.40 207.87A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 3,403.60 4,028.40 624.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 2,836.33 3,357.00 520.67 Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 56 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 2,269.07 2,685.60 416.53 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 6,050.84 7,162.80 1,111.96 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 5,042.37 5,969.00 926.63 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 4,033.89 4,775.20 741.31 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. I-A, I-B, II-A 17,250.48 19,767.60 2,517.12 8,509.00 10,072.80 1,563.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. II-B, III-A, V-A 14,375.40 16,473.00 2,097.60 7,090.83 8,394.00 1,303.17 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. III-B, IV, V-B 11,500.32 13,178.40 1,678.08 5,672.66 6,715.20 1,042.54 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. I-A, I-B, II-A 20,759.05 23,787.60 3,028.55 10,210.80 12,087.60 1,876.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. II-B, III-A, V-A 17,299.21 19,823.00 2,523.79 8,509.00 10,073.00 1,564.00 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. III-B, IV, V-B 13,839.37 15,858.40 2,019.03 6,807.20 8,058.40 1,251.20 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. I-A, I-B, II-A 23,390.48 26,803.20 3,412.72 13,236.22 15,669.60 2,433.38 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. II-B, III-A, V-A 19,492.07 22,336.00 2,843.93 11,030.18 13,058.00 2,027.82 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. III-B, IV, V-B 15,593.65 17,868.80 2,275.15 8,824.14 10,446.40 1,622.26 A-4 Arena 5,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 3,214.51 3,805.20 590.69 A-4 Arena 5,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 2,678.76 3,171.00 492.24 A-4 Arena 5,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 2,143.01 2,536.80 393.79 A-4 Arena 10,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 5,672.66 6,715.20 1,042.54 A-4 Arena 10,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 4,727.22 5,596.00 868.78 A-4 Arena 10,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 3,781.78 4,476.80 695.02 A-4 Arena 20,000 s.f. I-A, I-B, II-A 18,420.00 21,106.80 2,686.80 8,130.82 9,625.20 1,494.38 A-4 Arena 20,000 s.f. II-B, III-A, V-A 15,350.00 17,589.00 2,239.00 6,775.68 8,021.00 1,245.32 A-4 Arena 20,000 s.f. III-B, IV, V-B 12,280.00 14,071.20 1,791.20 5,420.55 6,416.80 996.25 A-4 Arena 50,000 s.f. I-A, I-B, II-A 23,390.48 26,803.20 3,412.72 9,832.62 11,640.00 1,807.38 A-4 Arena 50,000 s.f. II-B, III-A, V-A 19,492.07 22,336.00 2,843.93 8,193.85 9,700.00 1,506.15 A-4 Arena 50,000 s.f. III-B, IV, V-B 15,593.65 17,868.80 2,275.15 6,555.08 7,760.00 1,204.92 A-4 Arena 100,000 s.f. I-A, I-B, II-A 32,454.29 37,189.20 4,734.91 12,668.95 14,997.60 2,328.65 A-4 Arena 100,000 s.f. II-B, III-A, V-A 27,045.24 30,991.00 3,945.76 10,557.46 12,498.00 1,940.54 A-4 Arena 100,000 s.f. III-B, IV, V-B 21,636.19 24,792.80 3,156.61 8,445.97 9,998.40 1,552.43 A-5 Stadium 1,000 s.f. I-A, I-B, II-A 6,724.76 7,705.20 980.44 1,701.80 2,013.60 311.80 A-5 Stadium 1,000 s.f. II-B, III-A, V-A 5,603.97 6,421.00 817.03 1,418.17 1,678.00 259.83 A-5 Stadium 1,000 s.f. III-B, IV, V-B 4,483.18 5,136.80 653.62 1,134.53 1,342.40 207.87 A-5 Stadium 5,000 s.f. I-A, I-B, II-A 10,233.34 11,726.40 1,493.06 3,214.51 3,805.20 590.69 A-5 Stadium 5,000 s.f. II-B, III-A, V-A 8,527.78 9,772.00 1,244.22 2,678.76 3,171.00 492.24 A-5 Stadium 5,000 s.f. III-B, IV, V-B 6,822.22 7,817.60 995.38 2,143.01 2,536.80 393.79 A-5 Stadium 10,000 s.f. I-A, I-B, II-A 10,525.72 12,061.20 1,535.48 5,672.66 6,715.20 1,042.54 A-5 Stadium 10,000 s.f. II-B, III-A, V-A 8,771.43 10,051.00 1,279.57 4,727.22 5,596.00 868.78 A-5 Stadium 10,000 s.f. III-B, IV, V-B 7,017.14 8,040.80 1,023.66 3,781.78 4,476.80 695.02 A-5 Stadium 20,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 8,130.82 9,625.20 1,494.38 A-5 Stadium 20,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 6,775.68 8,021.00 1,245.32 A-5 Stadium 20,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 5,420.55 6,416.80 996.25 A-5 Stadium 50,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 9,832.62 11,640.00 1,807.38 Budget Fiscal Year 2026 Page 57 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
A-5 Stadium 50,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 8,193.85 9,700.00 1,506.15 A-5 Stadium 50,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 6,555.08 7,760.00 1,204.92 A-5 Stadium 100,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 12,858.04 15,222.00 2,363.96 A-5 Stadium 100,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 10,715.03 12,685.00 1,969.97 A-5 Stadium 100,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 8,572.03 10,148.00 1,575.97 B Office 1,000 s.f. I-A, I-B, II-A 13,065.60 11,402.86 1,662.74 2,079.98 2,461.20 381.22 B Office 1,000 s.f. II-B, III-A, V-A 10,888.00 9,502.38 1,385.62 1,733.31 2,051.00 317.69 B Office 1,000 s.f. III-B, IV, V-B 8,710.40 7,601.91 1,108.49 1,386.65 1,640.80 254.15 B Office 5,000 s.f. I-A, I-B, II-A 21,442.80 18,712.38 2,730.42 4,349.04 5,148.00 798.96 B Office 5,000 s.f. II-B, III-A, V-A 15,593.65 17,869.00 2,275.35 3,624.20 4,290.00 665.80 B Office 5,000 s.f. III-B, IV, V-B 14,295.20 12,474.92 1,820.28 2,899.36 3,432.00 532.64 B Office 10,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 7,563.55 8,953.20 1,389.65 B Office 10,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 6,302.96 7,461.00 1,158.04 B Office 10,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 5,042.37 5,968.80 926.43 B Office 20,000 s.f. I-A, I-B, II-A 23,098.10 26,468.40 3,370.30 10,778.06 12,759.60 1,981.54 B Office 20,000 s.f. II-B, III-A, V-A 19,248.42 22,057.00 2,808.58 8,981.72 10,633.00 1,651.28 B Office 20,000 s.f. III-B, IV, V-B 15,398.73 17,645.60 2,246.87 7,185.37 8,506.40 1,321.03 B Office 50,000 s.f. I-A, I-B, II-A 28,945.72 33,169.20 4,223.48 13,047.13 15,445.20 2,398.07 B Office 50,000 s.f. II-B, III-A, V-A 24,121.43 27,641.00 3,519.57 10,872.61 12,871.00 1,998.39 B Office 50,000 s.f. III-B, IV, V-B 19,297.15 22,112.80 2,815.65 8,698.08 10,296.80 1,598.72 B Office 100,000 s.f. I-A, I-B, II-A 33,916.20 38,864.40 4,948.20 16,261.64 19,250.40 2,988.76 B Office 100,000 s.f. II-B, III-A, V-A 28,263.50 32,387.00 4,123.50 13,551.36 16,042.00 2,490.64 B Office 100,000 s.f. III-B, IV, V-B 22,610.80 25,909.60 3,298.80 10,841.09 12,833.60 1,992.51 B Office 200,000 s.f. I-A, I-B, II-A 59,938.11 68,683.20 8,745.09 29,119.68 34,472.40 5,352.72 B Office 200,000 s.f. II-B, III-A, V-A 49,948.42 57,236.00 7,287.58 24,266.40 28,727.00 4,460.60 B Office 200,000 s.f. III-B, IV, V-B 39,958.74 45,788.80 5,830.06 19,413.12 22,981.60 3,568.48 B Office 500,000 s.f. I-A, I-B, II-A 68,709.54 78,734.40 10,024.86 35,737.78 42,307.20 6,569.42 B Office 500,000 s.f. II-B, III-A, V-A 57,257.95 65,612.00 8,354.05 29,781.49 35,256.00 5,474.51 B Office 500,000 s.f. III-B, IV, V-B 45,806.36 52,489.60 6,683.24 23,825.19 28,204.80 4,379.61 B Office 1,000,000 s.f. I-A, I-B, II-A 97,070.50 111,234.00 14,163.50 45,759.49 54,171.60 8,412.11 B Office 1,000,000 s.f. II-B, III-A, V-A 80,892.08 92,695.00 11,802.92 38,132.91 45,143.00 7,010.09 B Office 1,000,000 s.f. III-B, IV, V-B 64,713.66 74,156.00 9,442.34 30,506.33 36,114.40 5,608.07 B Medical Office 1,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 2,079.98 2,461.20 381.22B Medical Office 1,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 1,733.31 2,051.00 317.69 B Medical Office 1,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 1,386.65 1,640.80 254.15 B Medical Office 5,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 4,349.04 5,148.00 798.96B Medical Office 5,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 3,624.20 4,290.00 665.80 B Medical Office 5,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 2,899.36 3,432.00 532.64 B Medical Office 10,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 7,563.55 8,953.20 1,389.65B Medical Office 10,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 6,302.96 7,461.00 1,158.04 B Medical Office 10,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 5,042.37 5,968.80 926.43 Budget Fiscal Year 2026 Page 58 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
B Medical Office 20,000 s.f. I-A, I-B, II-A 23,682.86 27,138.00 3,455.14 10,967.15 12,982.80 2,015.65 B Medical Office 20,000 s.f. II-B, III-A, V-A 19,735.72 22,615.00 2,879.28 9,139.29 10,819.00 1,679.71 B Medical Office 20,000 s.f. III-B, IV, V-B 15,788.57 18,092.00 2,303.43 7,311.43 8,655.20 1,343.77 B Medical Office 50,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 13,047.13 15,445.20 2,398.07 B Medical Office 50,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 10,872.61 12,871.00 1,998.39 B Medical Office 50,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 8,698.08 10,296.80 1,598.72 B Medical Office 100,000 s.f. I-A, I-B, II-A 42,102.87 48,246.00 6,143.13 15,694.37 18,579.60 2,885.23 B Medical Office 100,000 s.f. II-B, III-A, V-A 35,085.72 40,205.00 5,119.28 13,078.64 15,483.00 2,404.36 B Medical Office 100,000 s.f. III-B, IV, V-B 28,068.58 32,164.00 4,095.42 10,462.91 12,386.40 1,923.49 B Restaurant <50 occupants 1,000 s.f. I-A, I-B, II-A 9,940.95 11,390.40 1,449.45 3,403.60 4,028.40 624.80 B Restaurant <50 occupants 1,000 s.f. II-B, III-A, V-A 8,284.13 9,492.00 1,207.87 2,836.33 3,357.00 520.67 B Restaurant <50 occupants 1,000 s.f. III-B, IV, V-B 6,627.30 7,593.60 966.30 2,269.07 2,685.60 416.53 B Restaurant <50 occupants 2,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 3,970.86 4,700.40 729.54 B Restaurant <50 occupants 2,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 3,309.05 3,917.00 607.95 B Restaurant <50 occupants 2,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 2,647.24 3,133.60 486.36 B Restaurant <50 occupants 5,000 s.f. I-A, I-B, II-A 14,034.29 16,081.20 2,046.91 5,294.49 6,267.60 973.11 B Restaurant <50 occupants 5,000 s.f. II-B, III-A, V-A 11,695.24 13,401.00 1,705.76 4,412.07 5,223.00 810.93 B Restaurant <50 occupants 5,000 s.f. III-B, IV, V-B 9,356.19 10,720.80 1,364.61 3,529.66 4,178.40 648.74 B Restaurant <50 occupants 10,000 s.f. I-A, I-B, II-A 16,665.72 19,096.80 2,431.08 12,668.95 14,997.60 2,328.65 B Restaurant <50 occupants 10,000 s.f. II-B, III-A, V-A 13,888.10 15,914.00 2,025.90 10,557.46 12,498.00 1,940.54 B Restaurant <50 occupants 10,000 s.f. III-B, IV, V-B 11,110.48 12,731.20 1,620.72 8,445.97 9,998.40 1,552.43 E Educational 1,000 s.f. I-A, I-B, II-A 8,771.43 10,051.20 1,279.77 1,512.71 1,790.40 277.69 E Educational 1,000 s.f. II-B, III-A, V-A 7,309.53 8,376.00 1,066.47 1,260.59 1,492.00 231.41 E Educational 1,000 s.f. III-B, IV, V-B 5,847.62 6,700.80 853.18 1,008.47 1,193.60 185.13 E Educational 5,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 3,214.51 3,805.20 590.69 E Educational 5,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 2,678.76 3,171.00 492.24 E Educational 5,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 2,143.01 2,536.80 393.79 E Educational 10,000 s.f. I-A, I-B, II-A 13,741.91 15,746.40 2,004.49 5,672.66 6,715.20 1,042.54 E Educational 10,000 s.f. II-B, III-A, V-A 11,451.59 13,122.00 1,670.41 4,727.22 5,596.00 868.78 E Educational 10,000 s.f. III-B, IV, V-B 9,161.27 10,497.60 1,336.33 3,781.78 4,476.80 695.02 E Educational 20,000 s.f. I-A, I-B, II-A 16,373.34 18,762.00 2,388.66 8,130.82 9,625.20 1,494.38 E Educational 20,000 s.f. II-B, III-A, V-A 13,644.45 15,635.00 1,990.55 6,775.68 8,021.00 1,245.32 E Educational 20,000 s.f. III-B, IV, V-B 10,915.56 12,508.00 1,592.44 5,420.55 6,416.80 996.25 E Educational 50,000 s.f. I-A, I-B, II-A 20,759.05 23,787.60 3,028.55 9,643.53 11,415.60 1,772.07 E Educational 50,000 s.f. II-B, III-A, V-A 17,299.21 19,823.00 2,523.79 8,036.27 9,513.00 1,476.73 E Educational 50,000 s.f. III-B, IV, V-B 13,839.37 15,858.40 2,019.03 6,429.02 7,610.40 1,181.38 E Educational 100,000 s.f. I-A, I-B, II-A 28,945.72 33,169.20 4,223.48 12,479.86 14,773.20 2,293.34 E Educational 100,000 s.f. II-B, III-A, V-A 24,121.43 27,641.00 3,519.57 10,399.88 12,311.00 1,911.12 E Educational 100,000 s.f. III-B, IV, V-B 19,297.15 22,112.80 2,815.65 8,319.91 9,848.80 1,528.89 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. I-A, I-B, II-A 7,601.91 8,710.80 1,108.89 1,512.71 1,790.40 277.69 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. II-B, III-A, V-A 6,334.92 7,259.00 924.08 1,260.59 1,492.00 231.41 Budget Fiscal Year 2026 Page 59 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. III-B, IV, V-B 5,067.94 5,807.20 739.26 1,008.47 1,193.60 185.13 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. I-A, I-B, II-A 11,402.86 13,065.60 1,662.74 3,214.51 3,805.20 590.69 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. II-B, III-A, V-A 9,502.38 10,888.00 1,385.62 2,678.76 3,171.00 492.24 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. III-B, IV, V-B 7,601.91 8,710.40 1,108.49 2,143.01 2,536.80 393.79 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 5,672.66 6,715.20 1,042.54 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 4,727.22 5,596.00 868.78 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 3,781.78 4,476.80 695.02 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. I-A, I-B, II-A 14,034.29 16,081.20 2,046.91 6,996.29 8,282.40 1,286.11 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. II-B, III-A, V-A 11,695.24 13,401.00 1,705.76 5,830.24 6,902.00 1,071.76 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. III-B, IV, V-B 9,356.19 10,720.80 1,364.61 4,664.19 5,521.60 857.41 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. I-A, I-B, II-A 16,665.72 19,096.80 2,431.08 8,130.82 9,625.20 1,494.38 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. II-B, III-A, V-A 13,888.10 15,914.00 2,025.90 6,775.68 8,021.00 1,245.32 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. III-B, IV, V-B 11,110.48 12,731.20 1,620.72 5,420.55 6,416.80 996.25 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 10,778.06 12,759.60 1,981.54 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 8,981.72 10,633.00 1,651.28 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 7,185.37 8,506.40 1,321.03 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. I-A, I-B, II-A 5,847.62 6,700.80 853.18 4,727.22 5,595.60 868.38 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. II-B, III-A, V-A 4,873.02 5,584.00 710.98 3,939.35 4,663.00 723.65 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. III-B, IV, V-B 3,898.41 4,467.20 568.79 3,151.48 3,730.40 578.92 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. I-A, I-B, II-A 8,771.43 10,051.20 1,279.77 6,239.93 7,386.00 1,146.07 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. II-B, III-A, V-A 7,309.53 8,376.00 1,066.47 5,199.94 6,155.00 955.06 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. III-B, IV, V-B 5,847.62 6,700.80 853.18 4,159.95 4,924.00 764.05 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. I-A, I-B, II-A 9,648.57 11,055.60 1,407.03 7,941.73 9,400.80 1,459.07 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. II-B, III-A, V-A 8,040.48 9,213.00 1,172.52 6,618.11 7,834.00 1,215.89 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. III-B, IV, V-B 6,432.38 7,370.40 938.02 5,294.49 6,267.20 972.71 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. I-A, I-B, II-A 10,525.72 12,061.20 1,535.48 10,399.88 12,310.80 1,910.92 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. II-B, III-A, V-A 8,771.43 10,051.00 1,279.57 8,666.57 10,259.00 1,592.43 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. III-B, IV, V-B 7,017.14 8,040.80 1,023.66 6,933.26 8,207.20 1,273.94 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 13,425.30 15,892.80 2,467.50 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 11,187.75 13,244.00 2,056.25 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 8,950.20 10,595.20 1,645.00 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., I-A, I-B, II-A 19,004.77 21,777.60 2,772.83 17,585.26 20,817.60 3,232.34 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., II-B, III-A, V-A 15,837.30 18,148.00 2,310.70 14,654.38 17,348.00 2,693.62 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., III-B, IV, V-B 12,669.84 14,518.40 1,848.56 11,723.51 13,878.40 2,154.89 S-2 Parking Garage 5,000 s.f. I-A, I-B, II-A 9,356.19 10,720.80 1,364.61 5,672.66 6,715.20 1,042.54S-2 Parking Garage 5,000 s.f. II-B, III-A, V-A 7,796.83 8,934.00 1,137.17 4,727.22 5,596.00 868.78 S-2 Parking Garage 5,000 s.f. III-B, IV, V-B 6,237.46 7,147.20 909.74 3,781.78 4,476.80 695.02 S-2 Parking Garage 10,000 s.f. I-A, I-B, II-A 14,326.67 16,416.00 2,089.33 7,374.46 8,730.00 1,355.54S-2 Parking Garage 10,000 s.f. II-B, III-A, V-A 11,938.89 13,680.00 1,741.11 6,145.39 7,275.00 1,129.61 S-2 Parking Garage 10,000 s.f. III-B, IV, V-B 9,551.11 10,944.00 1,392.89 4,916.31 5,820.00 903.69 S-2 Parking Garage 50,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 9,643.53 11,415.60 1,772.07 Budget Fiscal Year 2026 Page 60 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
S-2 Parking Garage 50,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 8,036.27 9,513.00 1,476.73 S-2 Parking Garage 50,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 6,429.02 7,610.40 1,181.38 S-2 Parking Garage 100,000 s.f. I-A, I-B, II-A 23,098.10 26,468.40 3,370.30 14,370.75 17,012.40 2,641.65 S-2 Parking Garage 100,000 s.f. II-B, III-A, V-A 19,248.42 22,057.00 2,808.58 11,975.62 14,177.00 2,201.38 S-2 Parking Garage 100,000 s.f. III-B, IV, V-B 15,398.73 17,645.60 2,246.87 9,580.50 11,341.60 1,761.10 S-2 Parking Garage 500,000 s.f. I-A, I-B, II-A 28,068.58 32,163.60 4,095.02 21,556.12 25,519.20 3,963.08 S-2 Parking Garage 500,000 s.f. II-B, III-A, V-A 23,390.48 26,803.00 3,412.52 17,963.44 21,266.00 3,302.56 S-2 Parking Garage 500,000 s.f. III-B, IV, V-B 18,712.38 21,442.40 2,730.02 14,370.75 17,012.80 2,642.05 S-2 Parking Garage 1,000,000 s.f. I-A, I-B, II-A 36,840.01 42,214.80 5,374.79 43,112.25 51,038.40 7,926.15 S-2 Parking Garage 1,000,000 s.f. II-B, III-A, V-A 30,700.01 35,179.00 4,478.99 35,926.87 42,532.00 6,605.13 S-2 Parking Garage 1,000,000 s.f. III-B, IV, V-B 24,560.00 28,143.20 3,583.20 28,741.50 34,025.60 5,284.10 U Utility/Misc 500 s.f. I-A, I-B, II-A 2,923.81 3,350.40 426.59 1,701.80 2,013.60 311.80 U Utility/Misc 500 s.f. II-B, III-A, V-A 2,436.51 2,792.00 355.49 1,418.17 1,678.00 259.83 U Utility/Misc 500 s.f. III-B, IV, V-B 1,949.21 2,233.60 284.39 1,134.53 1,342.40 207.87 U Utility/Misc 2,000 s.f. I-A, I-B, II-A 4,385.72 5,025.60 639.88 2,458.15 2,910.00 451.85 U Utility/Misc 2,000 s.f. II-B, III-A, V-A 3,654.76 4,188.00 533.24 2,048.46 2,425.00 376.54 U Utility/Misc 2,000 s.f. III-B, IV, V-B 2,923.81 3,350.40 426.59 1,638.77 1,940.00 301.23 U Utility/Misc 4,000 s.f. I-A, I-B, II-A 4,970.48 5,695.20 724.72 5,105.40 6,043.20 937.80 U Utility/Misc 4,000 s.f. II-B, III-A, V-A 4,142.06 4,746.00 603.94 4,254.50 5,036.00 781.50 U Utility/Misc 4,000 s.f. III-B, IV, V-B 3,313.65 3,796.80 483.15 3,403.60 4,028.80 625.20 U Utility/Misc 8,000 s.f. I-A, I-B, II-A 5,847.62 6,700.80 853.18 6,618.11 7,834.80 1,216.69 U Utility/Misc 8,000 s.f. II-B, III-A, V-A 4,873.02 5,584.00 710.98 5,515.09 6,529.00 1,013.91 U Utility/Misc 8,000 s.f. III-B, IV, V-B 3,898.41 4,467.20 568.79 4,412.07 5,223.20 811.13 U Utility/Misc 20,000 s.f. I-A, I-B, II-A 7,309.53 8,376.00 1,066.47 8,319.91 9,848.40 1,528.49 U Utility/Misc 20,000 s.f. II-B, III-A, V-A 6,091.27 6,980.00 888.73 6,933.26 8,207.00 1,273.74 U Utility/Misc 20,000 s.f. III-B, IV, V-B 4,873.02 5,584.00 710.98 5,546.60 6,565.60 1,019.00 U Utility/Misc 40,000 s.f. I-A, I-B, II-A 11,110.48 12,730.80 1,620.32 10,021.71 11,863.20 1,841.49 U Utility/Misc 40,000 s.f. II-B, III-A, V-A 9,258.73 10,609.00 1,350.27 8,351.42 9,886.00 1,534.58 U Utility/Misc 40,000 s.f. III-B, IV, V-B 7,406.99 8,487.20 1,080.21 6,681.14 7,908.80 1,227.66 U Utility/Misc (Associated w R-3 structures) 500 s.f. I-A, I-B, II-A 1,169.52 1,339.20 169.68 756.36 895.20 138.84 U Utility/Misc (Associated w R-3 structures) 500 s.f. II-B, III-A, V-A 974.60 1,116.00 141.40 630.30 746.00 115.70 U Utility/Misc (Associated w R-3 structures) 500 s.f. III-B, IV, V-B 779.68 892.80 113.12 504.24 596.80 92.56 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. I-A, I-B, II-A 1,754.29 2,010.00 255.71 1,134.53 1,342.80 208.27 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. II-B, III-A, V-A 1,461.91 1,675.00 213.09 945.44 1,119.00 173.56 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. III-B, IV, V-B 1,169.52 1,340.00 170.48 756.36 895.20 138.84U Utility/Misc (Associated w R-3 structures) 4,000 s.f. I-A, I-B, II-A 2,046.67 2,344.80 298.13 2,269.07 2,685.60 416.53 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. II-B, III-A, V-A 1,705.56 1,954.00 248.44 1,890.89 2,238.00 347.11 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. III-B, IV, V-B 1,364.44 1,563.20 198.76 1,512.71 1,790.40 277.69U Utility/Misc (Associated w R-3 structures) 8,000 s.f. I-A, I-B, II-A 2,339.05 2,679.60 340.55 3,025.42 3,580.80 555.38 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. II-B, III-A, V-A 1,949.21 2,233.00 283.79 2,521.18 2,984.00 462.82 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. III-B, IV, V-B 1,559.37 1,786.40 227.03 2,016.95 2,387.20 370.25 Budget Fiscal Year 2026 Page 61 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. I-A, I-B, II-A 8,771.43 10,051.20 1,279.77 1,890.89 2,238.00 347.11H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. II-B, III-A, V-A 7,309.53 8,376.00 1,066.47 1,575.74 1,865.00 289.26H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. III-B, IV, V-B 5,847.62 6,700.80 853.18 1,260.59 1,492.00 231.41 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 3,781.78 4,476.00 694.22H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 3,151.48 3,730.00 578.52H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 2,521.18 2,984.00 462.82 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. I-A, I-B, II-A 13,741.91 15,746.40 2,004.49 6,239.93 7,386.00 1,146.07H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. II-B, III-A, V-A 11,451.59 13,122.00 1,670.41 5,199.94 6,155.00 955.06H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. III-B, IV, V-B 9,161.27 10,497.60 1,336.33 4,159.95 4,924.00 764.05 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. I-A, I-B, II-A 20,174.29 23,118.00 2,943.71 10,967.15 12,982.80 2,015.65H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. II-B, III-A, V-A 16,811.91 19,265.00 2,453.09 9,139.29 10,819.00 1,679.71H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. III-B, IV, V-B 13,449.53 15,412.00 1,962.47 7,311.43 8,655.20 1,343.77 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. I-A, I-B, II-A 27,483.82 31,494.00 4,010.18 14,181.66 16,788.00 2,606.34 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. II-B, III-A, V-A 22,903.18 26,245.00 3,341.82 11,818.05 13,990.00 2,171.95 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. III-B, IV, V-B 18,322.54 20,996.00 2,673.46 9,454.44 11,192.00 1,737.56 H-5 HPM, 1,000 s.f. I-A, I-B, II-A 12,864.76 14,740.80 1,876.04 1,512.71 1,790.40 277.69 H-5 HPM, 1,000 s.f. II-B, III-A, V-A 10,720.64 12,284.00 1,563.36 1,260.59 1,492.00 231.41 H-5 HPM, 1,000 s.f. III-B, IV, V-B 8,576.51 9,827.20 1,250.69 1,008.47 1,193.60 185.13 H-5 HPM, 5,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 3,214.51 3,805.20 590.69 H-5 HPM, 5,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 2,678.76 3,171.00 492.24 H-5 HPM, 5,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 2,143.01 2,536.80 393.79 H-5 HPM, 10,000 s.f. I-A, I-B, II-A 20,759.05 23,787.60 3,028.55 5,483.58 6,490.80 1,007.22 H-5 HPM, 10,000 s.f. II-B, III-A, V-A 17,299.21 19,823.00 2,523.79 4,569.65 5,409.00 839.35 H-5 HPM, 10,000 s.f. III-B, IV, V-B 13,839.37 15,858.40 2,019.03 3,655.72 4,327.20 671.48 H-5 HPM, 20,000 s.f. I-A, I-B, II-A 24,560.00 28,143.60 3,583.60 7,941.73 9,400.80 1,459.07 H-5 HPM, 20,000 s.f. II-B, III-A, V-A 20,466.67 23,453.00 2,986.33 6,618.11 7,834.00 1,215.89 H-5 HPM, 20,000 s.f. III-B, IV, V-B 16,373.34 18,762.40 2,389.06 5,294.49 6,267.20 972.71 H-5 HPM, 50,000 s.f. I-A, I-B, II-A 30,700.01 35,179.20 4,479.19 9,454.44 11,192.40 1,737.96 H-5 HPM, 50,000 s.f. II-B, III-A, V-A 25,583.34 29,316.00 3,732.66 7,878.70 9,327.00 1,448.30 H-5 HPM, 50,000 s.f. III-B, IV, V-B 20,466.67 23,452.80 2,986.13 6,302.96 7,461.60 1,158.64 H-5 HPM, 100,000 s.f. I-A, I-B, II-A 43,564.77 49,921.20 6,356.43 12,290.77 14,550.00 2,259.23 H-5 HPM, 100,000 s.f. II-B, III-A, V-A 36,303.98 41,601.00 5,297.02 10,242.31 12,125.00 1,882.69 H-5 HPM, 100,000 s.f. III-B, IV, V-B 29,043.18 33,280.80 4,237.62 8,193.85 9,700.00 1,506.15 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 2,079.98 2,461.20 381.22 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 1,733.31 2,051.00 317.69 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 1,386.65 1,640.80 254.15 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 4,159.95 4,923.60 763.65 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 3,466.63 4,103.00 636.37 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 2,773.30 3,282.40 509.10 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 7,374.46 8,730.00 1,355.54 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 6,145.39 7,275.00 1,129.61 Budget Fiscal Year 2026 Page 62 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 4,916.31 5,820.00 903.69 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. I-A, I-B, II-A 23,682.86 27,138.00 3,455.14 10,399.88 12,310.80 1,910.92 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. II-B, III-A, V-A 19,735.72 22,615.00 2,879.28 8,666.57 10,259.00 1,592.43 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. III-B, IV, V-B 15,788.57 18,092.00 2,303.43 6,933.26 8,207.20 1,273.94 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 12,479.86 14,773.20 2,293.34 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 10,399.88 12,311.00 1,911.12 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 8,319.91 9,848.80 1,528.89 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. I-A, I-B, II-A 42,102.87 48,246.00 6,143.13 16,072.55 19,027.20 2,954.65 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. II-B, III-A, V-A 35,085.72 40,205.00 5,119.28 13,393.79 15,856.00 2,462.21 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. III-B, IV, V-B 28,068.58 32,164.00 4,095.42 10,715.03 12,684.80 1,969.77 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 1,890.89 2,238.00 347.11 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 1,575.74 1,865.00 289.26 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 1,260.59 1,492.00 231.41 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. I-A, I-B, II-A 19,004.77 21,777.60 2,772.83 3,970.86 4,700.40 729.54 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. II-B, III-A, V-A 15,837.30 18,148.00 2,310.70 3,309.05 3,917.00 607.95 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. III-B, IV, V-B 12,669.84 14,518.40 1,848.56 2,647.24 3,133.60 486.36 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 6,807.20 8,058.00 1,250.80 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 5,672.66 6,715.00 1,042.34 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 4,538.13 5,372.00 833.87 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. I-A, I-B, II-A 23,682.86 27,138.00 3,455.14 9,832.62 11,640.00 1,807.38 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. II-B, III-A, V-A 19,735.72 22,615.00 2,879.28 8,193.85 9,700.00 1,506.15 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. III-B, IV, V-B 15,788.57 18,092.00 2,303.43 6,555.08 7,760.00 1,204.92 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 11,723.51 13,878.00 2,154.49 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 9,769.59 11,565.00 1,795.41 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 7,815.67 9,252.00 1,436.33 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. I-A, I-B, II-A 42,102.87 48,246.00 6,143.13 14,181.66 16,788.00 2,606.34 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. II-B, III-A, V-A 35,085.72 40,205.00 5,119.28 11,818.05 13,990.00 2,171.95 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. III-B, IV, V-B 28,068.58 32,164.00 4,095.42 9,454.44 11,192.00 1,737.56 M Mercantile 1,000 s.f. I-A, I-B, II-A 8,186.67 9,380.40 1,193.73 3,214.51 3,805.20 590.69 M Mercantile 1,000 s.f. II-B, III-A, V-A 6,822.22 7,817.00 994.78 2,678.76 3,171.00 492.24 M Mercantile 1,000 s.f. III-B, IV, V-B 5,457.78 6,253.60 795.82 2,143.01 2,536.80 393.79 M Mercantile 5,000 s.f. I-A, I-B, II-A 12,572.38 14,406.00 1,833.62 4,916.31 5,820.00 903.69 M Mercantile 5,000 s.f. II-B, III-A, V-A 10,476.99 12,005.00 1,528.01 4,096.92 4,850.00 753.08 M Mercantile 5,000 s.f. III-B, IV, V-B 8,381.59 9,604.00 1,222.41 3,277.54 3,880.00 602.46 M Mercantile 10,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 7,374.46 8,730.00 1,355.54 M Mercantile 10,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 6,145.39 7,275.00 1,129.61 M Mercantile 10,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 4,916.31 5,820.00 903.69 M Mercantile 20,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 11,156.24 13,207.20 2,050.96 M Mercantile 20,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 9,296.87 11,006.00 1,709.13 M Mercantile 20,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 7,437.49 8,804.80 1,367.31 M Mercantile 50,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 14,370.75 17,012.40 2,641.65 Budget Fiscal Year 2026 Page 63 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
M Mercantile 50,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 11,975.62 14,177.00 2,201.38 M Mercantile 50,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 9,580.50 11,341.60 1,761.10 M Mercantile 100,000 s.f. I-A, I-B, II-A 21,928.58 25,128.00 3,199.42 18,530.70 21,937.20 3,406.50 M Mercantile 100,000 s.f. II-B, III-A, V-A 18,273.81 20,940.00 2,666.19 15,442.25 18,281.00 2,838.75 M Mercantile 100,000 s.f. III-B, IV, V-B 14,619.05 16,752.00 2,132.95 12,353.80 14,624.80 2,271.00 M Mercantile 200,000 s.f. I-A, I-B, II-A 24,560.00 28,143.60 3,583.60 24,392.46 28,876.80 4,484.34 M Mercantile 200,000 s.f. II-B, III-A, V-A 20,466.67 23,453.00 2,986.33 20,327.05 24,064.00 3,736.95 M Mercantile 200,000 s.f. III-B, IV, V-B 16,373.34 18,762.40 2,389.06 16,261.64 19,251.20 2,989.56 R-1 Apartments/Hotel Transient 1,000 s.f. I-A, I-B, II-A 10,233.34 11,726.40 1,493.06 3,592.69 4,252.80 660.11 R-1 Apartments/Hotel Transient 1,000 s.f. II-B, III-A, V-A 8,527.78 9,772.00 1,244.22 2,993.91 3,544.00 550.09 R-1 Apartments/Hotel Transient 1,000 s.f. III-B, IV, V-B 6,822.22 7,817.60 995.38 2,395.12 2,835.20 440.08 R-1 Apartments/Hotel Transient 5,000 s.f. I-A, I-B, II-A 15,788.57 18,092.40 2,303.83 6,807.20 8,058.00 1,250.80 R-1 Apartments/Hotel Transient 5,000 s.f. II-B, III-A, V-A 13,157.15 15,077.00 1,919.85 5,672.66 6,715.00 1,042.34 R-1 Apartments/Hotel Transient 5,000 s.f. III-B, IV, V-B 10,525.72 12,061.60 1,535.88 4,538.13 5,372.00 833.87 R-1 Apartments/Hotel Transient 10,000 s.f. I-A, I-B, II-A 16,373.34 18,762.00 2,388.66 11,345.33 13,430.40 2,085.07 R-1 Apartments/Hotel Transient 10,000 s.f. II-B, III-A, V-A 13,644.45 15,635.00 1,990.55 9,454.44 11,192.00 1,737.56 R-1 Apartments/Hotel Transient 10,000 s.f. III-B, IV, V-B 10,915.56 12,508.00 1,592.44 7,563.55 8,953.60 1,390.05 R-1 Apartments/Hotel Transient 20,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 15,883.46 18,802.80 2,919.34 R-1 Apartments/Hotel Transient 20,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 13,236.22 15,669.00 2,432.78 R-1 Apartments/Hotel Transient 20,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 10,588.97 12,535.20 1,946.23 R-1 Apartments/Hotel Transient 50,000 s.f. I-A, I-B, II-A 24,267.62 27,807.60 3,539.98 19,097.97 22,608.00 3,510.03 R-1 Apartments/Hotel Transient 50,000 s.f. II-B, III-A, V-A 20,223.02 23,173.00 2,949.98 15,914.97 18,840.00 2,925.03 R-1 Apartments/Hotel Transient 50,000 s.f. III-B, IV, V-B 16,178.42 18,538.40 2,359.98 12,731.98 15,072.00 2,340.02 R-1 Apartments/Hotel Transient 100,000 s.f. I-A, I-B, II-A 34,208.58 39,199.20 4,990.62 24,581.54 29,100.00 4,518.46 R-1 Apartments/Hotel Transient 100,000 s.f. II-B, III-A, V-A 28,507.15 32,666.00 4,158.85 20,484.62 24,250.00 3,765.38 R-1 Apartments/Hotel Transient 100,000 s.f. III-B, IV, V-B 22,805.72 26,132.80 3,327.08 16,387.70 19,400.00 3,012.30 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. I-A, I-B, II-A 10,233.34 11,726.40 1,493.06 3,403.60 4,028.40 624.80 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. II-B, III-A, V-A 8,527.78 9,772.00 1,244.22 2,836.33 3,357.00 520.67 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. III-B, IV, V-B 6,822.22 7,817.60 995.38 2,269.07 2,685.60 416.53 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. I-A, I-B, II-A 14,619.05 16,752.00 2,132.95 6,429.02 7,610.40 1,181.38 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. II-B, III-A, V-A 12,182.54 13,960.00 1,777.46 5,357.52 6,342.00 984.48 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. III-B, IV, V-B 9,746.03 11,168.00 1,421.97 4,286.01 5,073.60 787.59 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 11,345.33 13,430.40 2,085.07 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 9,454.44 11,192.00 1,737.56 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 7,563.55 8,953.60 1,390.05 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 13,803.48 16,340.40 2,536.92 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 11,502.90 13,617.00 2,114.10 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 9,202.32 10,893.60 1,691.28 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 16,828.90 19,922.40 3,093.50 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 14,024.09 16,602.00 2,577.91 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 11,219.27 13,281.60 2,062.33 Budget Fiscal Year 2026 Page 64 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 21,177.95 25,070.40 3,892.45 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 17,648.29 20,892.00 3,243.71 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 14,118.63 16,713.60 2,594.97 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 4,727.22 5,595.60 868.38 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 3,939.35 4,663.00 723.65 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 3,151.48 3,730.40 578.92 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 6,050.84 7,162.80 1,111.96 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 5,042.37 5,969.00 926.63 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 4,033.89 4,775.20 741.31 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. I-A, I-B, II-A 18,127.62 20,772.00 2,644.38 7,941.73 9,400.80 1,459.07 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. II-B, III-A, V-A 15,106.35 17,310.00 2,203.65 6,618.11 7,834.00 1,215.89 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. III-B, IV, V-B 12,085.08 13,848.00 1,762.92 5,294.49 6,267.20 972.71 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 10,210.80 12,087.60 1,876.80 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 8,509.00 10,073.00 1,564.00 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 6,807.20 8,058.40 1,251.20R-2.1 Residential Care/Assist Living Facility 50,000 s.f. I-A, I-B, II-A 26,314.29 30,153.60 3,839.31 13,425.30 15,892.80 2,467.50 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. II-B, III-A, V-A 21,928.58 25,128.00 3,199.42 11,187.75 13,244.00 2,056.25 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. III-B, IV, V-B 17,542.86 20,102.40 2,559.54 8,950.20 10,595.20 1,645.00 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. I-A, I-B, II-A 35,962.86 41,210.40 5,247.54 17,396.17 20,594.40 3,198.23 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. II-B, III-A, V-A 29,969.05 34,342.00 4,372.95 14,496.81 17,162.00 2,665.19 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. III-B, IV, V-B 23,975.24 27,473.60 3,498.36 11,597.45 13,729.60 2,132.15 R-3 Single Family Residential 2,000 s.f. I-A, I-B, II-A 4,093.33 4,689.60 596.27 1,323.62 1,566.00 242.38 R-3 Single Family Residential 2,000 s.f. II-B, III-A, V-A 3,411.11 3,908.00 496.89 1,103.02 1,305.00 201.98 R-3 Single Family Residential 2,000 s.f. III-B, IV, V-B 2,728.89 3,126.40 397.51 882.41 1,044.00 161.59 R-3 Single Family Residential 3,000 s.f. I-A, I-B, II-A 5,262.86 6,030.00 767.14 1,512.71 1,790.40 277.69 R-3 Single Family Residential 3,000 s.f. II-B, III-A, V-A 4,385.72 5,025.00 639.28 1,260.59 1,492.00 231.41 R-3 Single Family Residential 3,000 s.f. III-B, IV, V-B 3,508.57 4,020.00 511.43 1,008.47 1,193.60 185.13 R-3 Single Family Residential 5,000 s.f. I-A, I-B, II-A 7,601.91 8,710.80 1,108.89 2,079.98 2,461.20 381.22R-3 Single Family Residential 5,000 s.f. II-B, III-A, V-A 6,334.92 7,259.00 924.08 1,733.31 2,051.00 317.69 R-3 Single Family Residential 5,000 s.f. III-B, IV, V-B 5,067.94 5,807.20 739.26 1,386.65 1,640.80 254.15 R-3 Single Family Residential 10,000 s.f. I-A, I-B, II-A 8,479.05 9,715.20 1,236.15 2,836.33 3,357.60 521.27 R-3 Single Family Residential 10,000 s.f. II-B, III-A, V-A 7,065.87 8,096.00 1,030.13 2,363.61 2,798.00 434.39 R-3 Single Family Residential 10,000 s.f. III-B, IV, V-B 5,652.70 6,476.80 824.10 1,890.89 2,238.40 347.51 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 2,647.24 3,133.20 485.96 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 2,206.04 2,611.00 404.96 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 1,764.83 2,088.80 323.97 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 4,159.95 4,923.60 763.65 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 3,466.63 4,103.00 636.37 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 2,773.30 3,282.40 509.10 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. I-A, I-B, II-A 18,127.62 20,772.00 2,644.38 5,672.66 6,715.20 1,042.54 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. II-B, III-A, V-A 15,106.35 17,310.00 2,203.65 4,727.22 5,596.00 868.78 Budget Fiscal Year 2026 Page 65 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. III-B, IV, V-B 12,085.08 13,848.00 1,762.92 3,781.78 4,476.80 695.02 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 7,941.73 9,400.80 1,459.07 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 6,618.11 7,834.00 1,215.89 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 5,294.49 6,267.20 972.71 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. I-A, I-B, II-A 26,314.29 30,153.60 3,839.31 9,454.44 11,192.40 1,737.96 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. II-B, III-A, V-A 21,928.58 25,128.00 3,199.42 7,878.70 9,327.00 1,448.30 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. III-B, IV, V-B 17,542.86 20,102.40 2,559.54 6,302.96 7,461.60 1,158.64 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. I-A, I-B, II-A 35,962.86 41,210.40 5,247.54 12,290.77 14,550.00 2,259.23 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. II-B, III-A, V-A 29,969.05 34,342.00 4,372.95 10,242.31 12,125.00 1,882.69 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. III-B, IV, V-B 23,975.24 27,473.60 3,498.36 8,193.85 9,700.00 1,506.15 R-4 Residential Care/Assisted Living Facility 1,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 1,890.89 2,238.00 347.11 R-4 Residential Care/Assisted Living Facility 1,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 1,575.74 1,865.00 289.26 R-4 Residential Care/Assisted Living Facility 1,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 1,260.59 1,492.00 231.41 R-4 Residential Care/Assisted Living Facility 5,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 3,403.60 4,028.40 624.80 R-4 Residential Care/Assisted Living Facility 5,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 2,836.33 3,357.00 520.67 R-4 Residential Care/Assisted Living Facility 5,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 2,269.07 2,685.60 416.53R-4 Residential Care/Assisted Living Facility 10,000 s.f. I-A, I-B, II-A 18,127.62 20,772.00 2,644.38 5,672.66 6,715.20 1,042.54 R-4 Residential Care/Assisted Living Facility 10,000 s.f. II-B, III-A, V-A 15,106.35 17,310.00 2,203.65 4,727.22 5,596.00 868.78 R-4 Residential Care/Assisted Living Facility 10,000 s.f. III-B, IV, V-B 12,085.08 13,848.00 1,762.92 3,781.78 4,476.80 695.02 R-4 Residential Care/Assisted Living Facility 20,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 7,374.46 8,730.00 1,355.54 R-4 Residential Care/Assisted Living Facility 20,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 6,145.39 7,275.00 1,129.61 R-4 Residential Care/Assisted Living Facility 20,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 4,916.31 5,820.00 903.69 R-4 Residential Care/Assisted Living Facility 50,000 s.f. I-A, I-B, II-A 26,314.29 30,153.60 3,839.31 8,887.17 10,520.40 1,633.23 R-4 Residential Care/Assisted Living Facility 50,000 s.f. II-B, III-A, V-A 21,928.58 25,128.00 3,199.42 7,405.98 8,767.00 1,361.02 R-4 Residential Care/Assisted Living Facility 50,000 s.f. III-B, IV, V-B 17,542.86 20,102.40 2,559.54 5,924.78 7,013.60 1,088.82 R-4 Residential Care/Assisted Living Facility 100,000 s.f. I-A, I-B, II-A 35,962.86 41,210.40 5,247.54 11,345.33 13,430.40 2,085.07 R-4 Residential Care/Assisted Living Facility 100,000 s.f. II-B, III-A, V-A 29,969.05 34,342.00 4,372.95 9,454.44 11,192.00 1,737.56 R-4 Residential Care/Assisted Living Facility 100,000 s.f. III-B, IV, V-B 23,975.24 27,473.60 3,498.36 7,563.55 8,953.60 1,390.05 U Detached Access. Structure 2,000 s.f. I-A, I-B, II-A 4,678.10 5,360.40 682.30 2,458.15 2,910.00 451.85 U Detached Access. Structure 2,000 s.f. II-B, III-A, V-A 3,898.41 4,467.00 568.59 2,048.46 2,425.00 376.54 U Detached Access. Structure 2,000 s.f. III-B, IV, V-B 3,118.73 3,573.60 454.87 1,638.77 1,940.00 301.23 U Detached Access. Structure 3,000 s.f. I-A, I-B, II-A 5,847.62 6,700.80 853.18 2,647.24 3,133.20 485.96 U Detached Access. Structure 3,000 s.f. II-B, III-A, V-A 4,873.02 5,584.00 710.98 2,206.04 2,611.00 404.96 U Detached Access. Structure 3,000 s.f. III-B, IV, V-B 3,898.41 4,467.20 568.79 1,764.83 2,088.80 323.97 U Detached Access. Structure 5,000 s.f. I-A, I-B, II-A 8,479.05 9,715.20 1,236.15 3,970.86 4,700.40 729.54 U Detached Access. Structure 5,000 s.f. II-B, III-A, V-A 7,065.87 8,096.00 1,030.13 3,309.05 3,917.00 607.95 U Detached Access. Structure 5,000 s.f. III-B, IV, V-B 5,652.70 6,476.80 824.10 2,647.24 3,133.60 486.36 U Detached Access. Structure 10,000 s.f. I-A, I-B, II-A 9,356.19 10,720.80 1,364.61 5,294.49 6,267.60 973.11 U Detached Access. Structure 10,000 s.f. II-B, III-A, V-A 7,796.83 8,934.00 1,137.17 4,412.07 5,223.00 810.93 U Detached Access. Structure 10,000 s.f. III-B, IV, V-B 6,237.46 7,147.20 909.74 3,529.66 4,178.40 648.74 Budget Fiscal Year 2026 Page 66 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Footnotes:1. Shells pay 70% of the full fees.2. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged at the hourly plan review rate.3. Where plans are incomplete or changed so as to require additional plan checks, an additional plan check fee shall be charged at the rate established by the fee schedule and minimum hours as determined by the Building Official.
Budget Fiscal Year 2026 Page 67 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 164.00 138.00 $ $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138If fee > $138 - Staff will charge fee Fence - First 100 lineal feet (wood, vinyl, w.iron, etc.) 98.24 107.00 8.76 135.33 139.00 3.67 Each additional 100 lineal feet 12.07 13.00 0.93 18.04 18.00 (0.04) All masonry wall heights measured from top of footing to top of wall Masonry Wall - City Standard - First 100 lineal feet 128.41 130.00 1.59 270.65 279.00 8.35 Each additional 100 ft. 12.07 13.00 0.93 30.67 31.00 0.33Masonry Wal l- Special Design - ≤ 6ft high - First 100 lineal feet 343.75 417.00 73.25 270.65 279.00 8.35 Each additional 100 ft. 68.92 82.00 13.08 90.22 93.00 2.78 Retaining Wall - City Standard - First 100 lineal feet 128.41 130.00 1.59 180.43 186.00 5.57 Each additional 100 ft. 24.14 25.00 0.86 90.22 93.00 2.78Retaining Wall - Special Design -≤6 ft. high - First 100 lineal feet 343.75 417.00 73.25 270.65 279.00 8.35 Each additional 100 ft. 68.92 83.00 14.08 135.33 139.00 3.67 Retaining Wall - Special Design - over 6 ft. high per 1,000 sq. ft. 579.14 668.00 88.86 541.30 559.00 17.70 Combo - Wall per City Std 6 ft. wall over 2 ft. retaining first 100 lineal feet 128.41 129.00 0.59 225.54 233.00 7.46 Each additional 100 ft. 24.14 25.00 0.86 135.33 139.00 3.67 Combo Wall - Special Design - First 100 lineal feet 724.97 837.00 112.03 451.08 466.00 14.92 Each additional 100 linear feet 68.92 82.00 13.08 90.22 93.00 2.78Fireplace - Masonry - Freestanding - previously approved engineered 176.53 210.00 33.47 180.43 186.00 5.57Fireplace - Special Design - Freestanding 373.43 452.00 78.57 451.08 466.00 14.92Residential Patio Cover - City Std - lattice first 500 sq. ft. 158.09 208.00 49.91 360.87 373.00 12.13 Each additional 500 sq ft - - - 108.26 93.00 (15.26)Residential Patio Cover City Std - Solid roof - first 500 sq. ft 158.09 208.00 49.91 360.87 373.00 12.13 Each additional 500 sq. ft. - - - 135.33 111.00 (24.33)Residential Patio Cover Special Design - Lattice - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq ft 68.92 83.00 14.08 90.22 111.00 20.78 Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 68 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Residential Patio Cover Special Design - Solid roof - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 83.00 14.08 108.26 139.00 30.74 Commercial Patio Cover Special Design - Lattice - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq ft 68.92 83.00 14.08 108.26 111.00 2.74Commercial Patio Cover Special Design - Solid roof - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 83.00 14.08 135.33 139.00 3.67Patio Enclosure First 500 sq. ft. - ICC 153.94 299.00 145.06 270.65 279.00 8.35 Each additional 500 sq. ft. - - - 135.33 139.00 3.67 Patio Enclosure First 500 sq. ft. - Conventional/Special Design 166.67 430.00 263.33 270.65 279.00 8.35 Each additional 500 sq. ft. - - - 135.33 139.00 3.67 Balcony - City Standard - first 500 sq. ft. 218.43 270.00 51.57 360.87 373.00 12.13 Each additional 500 sq. ft. - - - 135.33 139.00 3.67 Balcony - Special Design - first 500 sq. ft. 442.35 577.00 134.65 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 82.00 13.08 90.22 93.00 2.78 Residential Garage - wood frame - first 500 sq. ft. 871.50 911.00 39.50 541.30 559.00 17.70 each additional 500 sq ft 68.92 82.00 13.08 360.87 373.00 12.13SFR Carport - City Standard - Solid Roof - first 500 sq. ft. 246.00 303.00 57.00 360.87 373.00 12.13 Each additional 500 sq. ft. - - - 108.26 111.00 2.74 SFR Carport - Special Design - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 82.00 13.08 90.22 93.00 2.78MFR/Comm Carport - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 82.00 13.08 90.22 93.00 2.78Storage Shed:Wood frame first 500 sq. ft. 406.70 527.00 120.30 360.87 373.00 12.13 Each additional 500 sq. ft. (any material) 68.92 82.00 13.08 90.22 93.00 2.78Masonry 544.53 692.00 147.47 541.30 559.00 17.70Metal/Other 199.94 280.00 80.06 360.87 373.00 12.13Loft - Special Design - first 500 sq. ft. 494.10 619.00 124.90 541.30 559.00 17.70 Budget Fiscal Year 2026 Page 69 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Each additional 500 sq. ft. - - - 135.33 139.00 3.67
Garage Conversion - Conventional Construction - first 500 sq. ft. 406.70 615.00 208.30 721.74 746.00 24.26 Each additional 500 sq. ft. (see Note 1) - - - 135.33 139.00 3.67 -
Garage Conversion - Special Design - first 500 sq. ft. 544.53 817.00 272.47 721.74 746.00 24.26 Each additional 500 sq. ft. (see Note 2) - - - 135.33 139.00 3.67 Existing Garage Conversion into Accessory Dwelling Unit ADU 1,383.61 1,565.00 181.39 1,082.60 1,119.00 36.40 Each Additional 500 sq ft - 113.00 113.00 135.33 139.00 3.67 New Accessory Dwelling Unit ADU
Fee as a new SFD per sq. ft.
Swimming pool / Spa permit includes: slide /rock features/ 1 electrical pool panel/2 pumps/pool lights/filter/treatment systems/all piping and electrical wiring-Heaters not included-see Mechanical fee schedule (Table E)/Additional electrical panels or motors per Electrical fee schedule (Table D) Swimming Pool - Private - First 800 sq. ft. 351.74 233.00 (118.74) 902.17 932.00 29.83 Each additional 500 sq. ft. 34.46 41.00 6.54 270.65 279.00 8.35 Swimming Pool Fiberglass / Vinyl 103.73 126.00 22.27 721.74 746.00 24.26 Swimming Pool - Public - First 800 sq. ft. 829.73 994.00 164.27 902.17 932.00 29.83 Each additional 500 sq. ft. 34.46 41.00 6.54 270.65 279.00 8.35 Swimming pool grotto or additional structural/water features - each 137.84 165.00 27.16 270.65 279.00 8.35 Swimming pool misc structure or code upgrade/modifications 137.84 165.00 27.16 270.65 279.00 8.35 Ponds/Fountains 200 sq. ft. or less 137.84 164.00 26.16 360.87 373.00 12.13Room Addition Single Family Dwelling - first 500 sq. ft. 990.38 1,126.00 135.62 902.17 932.00 29.83 Each additional 500 sq. ft. 136.65 156.00 19.35 270.65 279.00 8.35Foundation Repair /seismic upgrade/per 200 lineal feet of foundation 275.68 330.00 54.32 270.65 279.00 8.35Window Residential - New / Changeout / Skylights 102.19 115.00 12.81 135.33 139.00 3.67Window Non-Residential - New / Changeout / Skylights (Each 50) 201.13 235.00 33.87 135.33 139.00 3.67 Re-roof - Residential comp over 1 existing layer
First 3,000 sq. ft. 94.80 103.00 8.20 135.33 139.00 3.67 Each additional 1,500 sq. ft. 13.78 17.00 3.22 18.04 18.00 (0.04) Budget Fiscal Year 2026 Page 70 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Re-roof Residential - Special Design - Tile, etc. First 3,000 sq. ft. 145.00 129.26 15.74 135.33 139.00 3.67 Each additional 1,500 sq. ft. 33.00 27.57 5.43 18.04 18.00 (0.04) Re-roof - Non Residential First 50,000 sq. ft. 178.00 166.16 11.84 225.54 233.00 7.46 Each additional 50,000 sq. ft. 17.00 13.78 3.22 135.33 139.00 3.67 Storage Racks 6 ft. and Higher - Interior First 500 lineal feet 610.00 539.90 70.10 180.43 186.00 5.57 Each additional 500 ft. 48.00 38.75 9.25 90.22 93.00 2.78 Storage Racks 6 ft and Higher - Exterior First 500 lineal feet 833.00 720.53 112.47 180.43 186.00 5.57 Each additional 500 ft. 48.00 38.75 9.25 90.22 93.00 2.78 Cell Site / Commercial Antenna Structure - Each 887.01 1,003.00 115.99 270.65 279.00 8.35 Flag Pole - City Standard - Each 73.00 67.73 5.27 90.22 93.00 2.78 Silo - Per 5,000 Cu. Ft. Volume 998.00 858.37 139.63 360.87 373.00 12.13 Miscellaneous Plan Check - Includes 3 Plan Checks / Inspections Only Additional charges per hour begin at 4th review or inspection 1,435.09 1,668.00 232.91 541.30 559.00 17.70 Single Family Dwelling and Garage Fire Damage
Up to 30% Fire Damage Miscellaneous - includes 3 plan checks/inspections only 349.66 436.00 86.34 541.30 559.00 17.70 30%-70% Fire Damage 793.99 997.00 203.01 1,082.60 1,119.00 36.40 70%-100% Fire Damage (Fee for new single family dwelling and new garage will apply) - - - 1,353.25 1,399.00 45.75 Commercial / Industrial Canopy First 1,000 sq. ft. 1,024.84 1,168.00 143.16 541.30 559.00 17.70 Each additional 1,000 sq. ft. 99.09 117.00 17.91 135.33 139.00 3.67Fueling Station Canopy per 2,000 sq. ft. 1,024.84 1,168.00 143.16 541.30 559.00 17.70Sign - Non-Electrical 200 sq. ft. or less Wall Mounted 68.92 82.00 13.08 180.43 186.00 5.57 Monument 6 ft. high or less 137.84 165.00 27.16 180.43 186.00 5.57 Pole sign 200 sq. ft. or less and 20 ft. high or less 413.51 494.00 80.49 270.65 279.00 8.35 Budget Fiscal Year 2026 Page 71 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Each additional 200 sq. ft. and/or each additional 20 ft. height 68.92 82.00 13.08 90.22 93.00 2.78 Sign - Electrical - see Electrical fees Site Accessibility Improvements: Per Ramp 590.00 525.87 64.13 180.43 186.00 5.57 Per Stairway 658.00 551.35 106.65 360.87 373.00 12.13
Per Accessible Parking Stall 659.00 551.35 107.65 180.43 186.00 5.57 Per Elevator / Lift 658.00 551.35 106.65 721.74 746.00 24.26 Parking lot restripe per 100 parking spaces 275.68 329.00 53.32 180.43 186.00 5.57 Demolition: Pool Demo without Compaction Report 99.09 114.00 14.91 135.33 139.00 3.67 Pool Demo with Compaction Report 282.82 323.00 40.18 90.22 93.00 2.78 Residential Demo (Interior Only) 164.00 137.84 26.16 90.22 93.00 2.78 Residential Demo 501.00 477.93 23.07 90.22 93.00 2.78
Non-Res Demo (Interior Only) 164.00 137.84 26.16 90.22 93.00 2.78 Non-Res Demo 501.00 477.93 23.07 90.22 93.00 2.78
Demising Wall per 1,000 sq. ft. 461.00 430.70 30.30 360.87 373.00 12.13 Manufactured Home First Section 12'x60' (720 sq. ft.) 698.32 784.00 85.68 270.65 279.00 8.35 Each additional section 68.92 82.00 13.08 45.11 46.00 0.89Manufactured Home Foundation System First Section 12'x60' (720 sq. ft.) 403.60 482.00 78.40 360.87 373.00 12.13 Each additional section 68.92 82.00 13.08 45.11 46.00 0.89Commercial Coach / Manufactured Building first Section 12'x60' (720 sq. ft.) 836.16 947.00 110.84 360.87 373.00 12.13 Each additional section 68.92 82.00 13.08 90.22 93.00 2.78Foundation System for Commercial Coach / Manufactured Building First Section 12'x60' (720 sq. ft.) 779.34 869.00 89.66 360.87 373.00 12.13 Each additional section 68.92 82.00 13.08 45.11 46.00 0.89Vault Underground 631.47 712.00 80.53 90.22 93.00 2.78 Above Ground 562.55 630.00 67.45 90.22 93.00 2.78 Budget Fiscal Year 2026 Page 72 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Bleachers per 1,000 sq. ft. 873.00 757.22 115.78 360.87 373.00 12.13 Certified Access Specialist Program (CASP) Review - Per Hour 137.84 165.00 27.16 180.43 186.00 5.57 Code Compliance Inspection - Per Hour - - - 180.43 186.00 5.57 Footnotes:
1. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged at the hourly plan review rate.
2. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.
3. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.4. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees.* Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.Note 1: This item applies to the conversion of an existing garage into a habitable space such as: a bedroom, guest room, living room, family room, etc., but not an Accessory Dwelling Unit (ADU). Note 2: Same as Note 1, but with Engineering.
Budget Fiscal Year 2026 Page 73 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table C: Plumbing
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 164.00 138.00 $ $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138If fee > $138 - Staff will charge fee Plumbing Fee Per Each FixtureWater Closet(Toilet)/Bidet 18.96 21.00 2.04 18.04 18.00 (0.04) Lavatory/Sink 18.96 21.00 2.04 18.04 18.00 (0.04)Kitchen Sink 18.96 21.00 2.04 18.04 18.00 (0.04)Bathtub 18.96 21.00 2.04 18.04 18.00 (0.04)Shower 18.96 21.00 2.04 18.04 18.00 (0.04)Dishwasher 18.96 21.00 2.04 18.04 18.00 (0.04)Laundry Tray or Mop Sink 18.96 21.00 2.04 18.04 18.00 (0.04)Urinal & Waterless Urinal 18.96 21.00 2.04 18.04 18.00 (0.04)Clothes washer 18.96 21.00 2.04 18.04 18.00 (0.04)Floor Sink or Floor Drain 18.96 21.00 2.04 18.04 18.00 (0.04) Water Heater-storage tank 100 Gal or less 63.44 63.00 (0.44) 45.11 46.00 0.89Water Heater-storage tank over 100 Gal 123.77 125.00 1.23 72.17 74.00 1.83 Water Heater-Gas-instantaneous 199,000 btu or less 149.91 177.00 27.09 270.65 279.00 8.35 Water Heater-Electrical instantaneous (insta hot) 18.96 21.00 2.04 18.04 18.00 (0.04) MISC fixtures Per fixture 18.96 21.00 2.04 18.04 18.00 (0.04) Each Gas Outlet 18.96 20.00 1.04 9.02 9.00 (0.02)
Hose Bibb 16.20 18.00 1.80 13.53 13.00 (0.53)
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 74 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table C: Plumbing
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Lawn Sprinkler valve/Backflow device 16.20 17.00 0.80 5.41 5.00 (0.41)Building Sewer/Trailer park sewer-per unit 16.20 17.00 0.80 5.41 5.00 (0.41) Septic Tank/Leach field 30.17 31.00 0.83 180.43 186.00 5.57 Septic Tank Demolition 46.53 53.00 6.47 90.22 93.00 2.78Interceptor-Grease, oil, sand etc. 287.74 342.00 54.26 180.43 186.00 5.57 Water Softener 30.17 31.00 0.83 36.09 37.00 0.91Solar or Hydronic Systems 146.42 179.00 32.58 180.43 186.00 5.57 Water Repipe-Single Family Dwelling 120.68 124.00 3.32 270.65 279.00 8.35 Misc piping per 300 lineal ft 46.53 53.00 6.47 90.22 93.00 2.78Medical Gas/Air outlets each 25.85 29.00 3.15 13.53 13.00 (0.53)Gray Water System 149.91 177.00 27.09 270.65 279.00 8.35 Roof Drains - per building 149.91 177.00 27.09 270.65 279.00 8.35 Commercial Reclaimed water system 149.91 177.00 27.09 270.65 279.00 8.35 Water Service 18.96 21.00 2.04 18.04 18.00 (0.04)
Pressure Regulator 18.96 20.00 1.04 9.02 9.00 (0.02)Hot Water Recirculation System 46.53 54.00 7.47 45.11 46.00 0.89Backflow valves 25.85 29.00 3.15 9.02 9.00 (0.02)Sump Pump - Per Building 287.74 342.00 54.26 270.65 279.00 8.35 Sewage Ejection System/Grinder Pump - Per Site 425.58 507.00 81.42 270.65 279.00 8.35 Swimming pool misc piping/retrofit/repair 46.53 54.00 7.47 45.11 46.00 0.89 Above Ground Storage Tank Install (0-660 gallons) 522.30 716.00 193.70 90.22 93.00 2.78 Budget Fiscal Year 2026 Page 75 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table C: Plumbing
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Above Ground Storage Tank Install (661+ gallons) 757.35 881.00 123.65 180.43 186.00 5.57 Footnotes:1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees noted above.* Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
Budget Fiscal Year 2026 Page 76 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection 138.00 $ 164.00 $ 26.00 $ 138.00 $ 164.00 $ 26.00 $ If fee < $138 - Staff will charge $138If fee > $138 - Staff will charge fee Single Family Residential New Service - Single Family Dwelling 225 amps or less service 287.74 342.00 54.26 541.30 559.00 17.70 (includes Circuits, Outlets, Switches, etc. no sub-panels included)Sub-Panels - Single family Single phase 225 amps or less 149.91 177.00 27.09 135.33 139.00 3.67 Service Change-Out -Single Family Single phase 90.51 93.00 2.49 270.65 279.00 8.35 Residential rewire without panel change out minimum fee up to 1,500 square feet (includes Circuits, Outlets, Switches, etc. no sub-panels included) 60.34 68.00 7.66 360.87 373.00 12.13 Residential rewire without panel change out minimum fee from 1,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc. and 1 sub-panels included) 60.34 68.00 7.66 451.08 466.00 14.92 Residential rewire with panel change out minimum fee up to 1,500 square feet (includes Circuits, Outlets, Switches, etc. no sub-panels included) 60.34 68.00 7.66 451.08 466.00 14.92 Residential rewire with panel change out minimum fee from 1,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc. and 1 sub-panels included) 60.34 68.00 7.66 541.30 559.00 17.70 New Service - Single Family Single phase Services 400 amps or less 425.58 506.00 80.42 541.30 559.00 17.70 New Service - Single Family Single phase Services 600 amps or less 425.58 506.00 80.42 541.30 559.00 17.70 New Service - Single Family Single phase Services 1200 amps or less 425.58 506.00 80.42 451.08 466.00 14.92 New Service - Single Family Single phase Services each additional 1000 amps 149.91 177.00 27.09 180.43 186.00 5.57 New Services - Commercial/Industrial and all three phase (Circuits, Outlets, Switches, etc. no sub-panels included) 225 Amps or less 287.74 341.00 53.26 360.87 373.00 12.13 400 Amps 425.58 506.00 80.42 541.30 559.00 17.70
600 Amps 563.42 671.00 107.58 721.74 746.00 24.26
800 Amps 563.42 671.00 107.58 721.74 746.00 24.26
1000 Amps 563.42 671.00 107.58 721.74 746.00 24.26
1200 Amps 563.42 671.00 107.58 721.74 746.00 24.26
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 77 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
1600 Amps 671.00 563.42 107.58 721.74 746.00 24.26
each 1000 Amps over 1600 424.00 356.66 67.34 360.87 373.00 12.13 Commercial/Industrial and all three phase - "Service Only" change out (Service panel only does not include wiring new circuits) 225 Amps or less 137.00 116.05 20.95 270.65 279.00 8.35 400 Amps 177.00 149.91 27.09 360.87 373.00 12.13
600 Amps 341.00 287.74 53.26 360.87 373.00 12.13
800 Amps 341.00 287.74 53.26 360.87 373.00 12.13
1000 Amps 341.00 287.74 53.26 360.87 373.00 12.13
1200 Amps 342.00 287.74 54.26 396.95 410.00 13.05
1600 Amps 342.00 287.74 54.26 451.08 466.00 14.92
each 1000 Amps over 1600 177.00 149.91 27.09 180.43 186.00 5.57 Sub-panels, motor control panels etc. Commercial/Industrial and all three phases 225 Amps or less 341.00 287.74 53.26 360.87 373.00 12.13 400 Amps 341.00 287.74 53.26 360.87 373.00 12.13
600 Amps 287.74 342.00 54.26 541.30 559.00 17.70
800 Amps 425.58 506.00 80.42 541.30 559.00 17.70
1000 Amps 425.58 506.00 80.42 721.74 746.00 24.26
1200 Amps 425.58 506.00 80.42 721.74 746.00 24.26
1600 Amps 425.58 506.00 80.42 721.74 746.00 24.26
each 1000 Amps over 1600 218.82 259.00 40.18 180.43 186.00 5.57 Other misc electrical Items
Transformer - each 149.91 177.00 27.09 180.43 186.00 5.57 Generator - Permanent - each 1000 amps 287.74 342.00 54.26 270.65 279.00 8.35 Generator - Temporary - more than 8 kW 30.17 31.00 0.83 45.11 46.00 0.89 Solar - Photovoltaic - Residential 15 KW or Less 305.57 368.00 62.43 180.43 187.00 6.57 Solar - Photovoltaic - Residential each additional KW above 15 KW 7.90 8.00 0.10 9.02 9.00 (0.02) Solar - Photovoltaic - Commercial 50 KW or Less 680.62 884.00 203.38 360.87 373.00 12.13 Solar - Photovoltaic - Commercial each additional KW between 51 KW and 250 KW 4.59 5.00 0.41 3.01 3.00 (0.01) Solar - Photovoltaic - Commercial each additional kW above 250 KW 2.76 3.00 0.24 3.01 3.00 (0.01) Budget Fiscal Year 2026 Page 78 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Temporary Power Pole 62.00 60.34 1.66 90.22 93.00 2.78
Temporary Power Pole - additional receptacle pole - - - 36.09 37.00 0.91 Light Standard - First 5 poles 259.00 218.82 40.18 180.43 186.00 5.57 each additional 5 poles 54.00 46.53 7.47 45.11 46.00 0.89 Electrical Sign - per sign 200 sq ft or less/includes 2 sign transformers Wall mounted 200 sq ft or less 124.00 120.68 3.32 270.65 279.00 8.35 Monument 6 ft high or less and 200 sq ft or less 287.74 342.00 54.26 270.65 279.00 8.35 Pole/monument sign 200 sq ft or less and 20 ft high or less 425.58 507.00 81.42 270.65 279.00 8.35 Each additional 200 sq ft and/or each additional 20 ft height and/or each additional 2 sign transformers 54.00 46.53 7.47 135.33 139.00 3.67 Cell site Electrical per commercial panels scheduleHazardous Locations Misc Electrical 287.74 341.00 53.26 360.87 373.00 12.13 Fuel Cell- Power Generating System-Each 200 amp ac output 630.17 695.00 64.83 360.87 373.00 12.13 Electric Vehicle Charging Station: Commercial 223.00 148.71 74.29 90.22 93.00 2.78 Residential 127.00 114.25 12.75 90.22 93.00 2.78
EV-only Main Service Panel 46.53 53.00 6.47 90.22 93.00 2.78 Electrical Meter Reset 30.17 31.00 0.83 90.22 93.00 2.78 Misc Electrical circuits-Residential (added to existing panel) 12.07 13.00 0.93 270.65 279.00 8.35 Misc Electrical Circuits-Non Residential (added to existing panel) 287.74 342.00 54.26 270.65 279.00 8.35 Swimming pool pump motor 99.09 113.00 13.91 180.43 186.00 5.57 Footnotes:1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar photovoltaic fees noted above.
Budget Fiscal Year 2026 Page 79 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
* Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
Budget Fiscal Year 2026 Page 80 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 164.00 138.00 $ $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138If fee > $138 - Staff will charge fee A/C Unit ≤ 100,000 BTU 292.35 363.00 70.65 72.17 74.00 1.83 A/C Unit > 100,000 BTU 292.35 363.00 70.65 90.22 93.00 2.78 FAU Furnace or Heat Pump < 100,000 BTU 292.35 363.00 70.65 72.17 74.00 1.83 FAU Furnace or Heat Pump > 100,000 BTU 292.35 363.00 70.65 90.22 93.00 2.78 Refrigeration Unit 223.43 281.00 57.57 72.17 74.00 1.83 Condensors 100.47 111.00 10.53 72.17 74.00 1.83
Boilers 100,000 BTU or less 420.30 507.00 86.70 360.87 373.00 12.13 Boilers 500,000 BTU or less 420.30 507.00 86.70 360.87 373.00 12.13 Boilers 1,000,000 BTU or less 558.14 672.00 113.86 360.87 373.00 12.13 Boilers 1,750,000 BTU or less 558.14 673.00 114.86 541.30 559.00 17.70 Boilers over 1,750,000 BTU 558.14 672.00 113.86 721.74 746.00 24.26 Compressors 151.17 184.00 32.83 45.11 46.00 0.89
Evaporative Coolers - Residential 148.71 168.00 19.29 180.43 186.00 5.57 Evaporative Coolers - Commercial / Industrial 183.17 209.00 25.83 180.43 186.00 5.57 Air Handling Unit 316.58 370.00 53.42 180.43 186.00 5.57 Environmental Air Duct / Vent Fan Single Duct / Res Range Exhaust 18.96 12.00 (6.96) 9.02 9.00 (0.02) Type 1 or 2 Hood / Duct system 352.23 420.00 67.77 360.87 373.00 12.13 Miscellaneous Duct Work 149.91 177.00 27.09 90.22 93.00 2.78 Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 81 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Special Equipment - Spray Booth (Exterior of Bldg) 639.23 756.00 116.77 270.65 279.00 8.35 -
Special Equipment - Spray Booth (Interior of Bldg) 458.60 587.00 128.40 270.65 279.00 8.35 Unlisted Equipment (Minimum or by the hour) 485.11 591.00 105.89 180.43 186.00 5.57 Wall Heater 149.91 177.00 27.09 180.43 186.00 5.57
Commercial Unit Heater 183.17 210.00 26.83 270.65 279.00 8.35 Cooling Tower / Chiller 703.96 841.00 137.04 541.30 559.00 17.70 Dryer Duct 22.41 25.00 2.59 13.53 13.00 (0.53)Fueling Station Dispenser / Equipment 639.23 780.00 140.77 270.65 279.00 8.35 Underground Storage Tank (1 tank) 711.56 878.00 166.44 270.65 279.00 8.35 Underground Storage Tank (2 tanks) 767.69 950.00 182.31 270.65 279.00 8.35 Underground Storage Tank (3 tanks) 863.27 1,077.00 213.73 270.65 279.00 8.35 Underground Storage Tank (add'l tank over 3) 110.24 141.00 30.76 45.11 46.00 0.89 Above Ground Storage Tank Install (0-660 gallons) 368.99 469.00 100.01 90.22 93.00 2.78 Above Ground Storage Tank Install (661+ gallons) 563.65 713.00 149.35 180.43 186.00 5.57 Package wall unit heat / cooling ≤ 100,000 BTU 149.91 177.00 27.09 180.43 186.00 5.57 Fireplace - Listed Mechanical per unit 103.35 132.00 28.65 45.11 46.00 0.89 Decorative Gas Appliance 75.78 100.00 24.22 18.04 18.00 (0.04) Product - Conveying Duct System-Dust, Vapor, Central Vacuum system (PC based on dust collection) 544.09 657.00 112.91 270.65 279.00 8.35 Fan - coil unit - residential 46.53 53.00 6.47 90.22 93.00 2.78 Fan - Whole House 149.91 177.00 27.09 135.33 139.00 3.67 Budget Fiscal Year 2026 Page 82 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only (with PME Included)
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET-BASED FEES
Dust Collection System 492.00 406.25 85.75 360.87 373.00 12.13 Process piping system - 0-500 ft 341.00 287.74 53.26 360.87 373.00 12.13 Process piping system - 501-1,000 ft 287.74 342.00 54.26 541.30 559.00 17.70 Process piping system - 1,000+ ft 835.00 701.26 133.74 1,082.60 1,119.00 36.40 Solar or Hydronic systems 288.00 240.00 48.00 90.22 93.00 2.78 Swimming Pool Solar System 256.00 206.73 49.27 90.22 93.00 2.78 Thermal Energy Storage System - Residential 10 kWth or less 299.76 414.00 114.24 180.43 186.00 5.57 Thermal Energy Storage System - Residential ea adtl. kWth above 10 kWth 8.17 9.00 0.83 3.15 3.00 (0.15) Residential FAU Change out (Same Location) 80.99 95.00 14.01 135.33 139.00 3.67 Residential A/C Condensor Change Out 80.99 94.00 13.01 90.22 93.00 2.78 Combo: Residential FAU and/or A/C Condensor Change Out (Same Location) 80.99 95.00 14.01 180.43 186.00 5.57 Non-Residential FAU Change out (Same Location) 80.99 95.00 14.01 180.43 186.00 5.57 Non-Residential A/C Condensor Change Out 80.99 95.00 14.01 180.43 186.00 5.57 Swimming Pool Heater 51.00 44.11 6.89 180.43 186.00 5.57 Industrial Ovens 425.58 507.00 81.42 270.65 279.00 8.35 Footnotes:1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official. 3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees noted above.* Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.
Budget Fiscal Year 2026 Page 83 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
A-1 Theater 1,000 s.f. I-A, I-B, II-A $ 567.27 2,543.71 $ 2,914.56 $ 671.40 $ 474.98 $ 4,239.52 $ 945.44 $ 4,857.60 $ 1,119.00 $ 791.63 $ A-1 Theater 1,000 s.f. II-B, III-A, V-A 2, 472.72 119.76 2,428.80 559.50 395.82 3,532.94 787.87 4,048.00 932.50 659.69 A-1 Theater 1,000 s.f. III-B, IV, V-B 1,695.81 378.18 1,943.04 447.60 316.65 2,826.35 630.30 3,238.40 746.00 527.75A-1 Theater 5,000 s.f. I-A, I-B, II-A 3,947.14 1,134.53 4,523.04 1,342.80 784.16 6,578.57 1,890.89 7,538.40 2,238.00 1,306.94 A-1 Theater 5,000 s.f. II-B, III-A, V-A 3,289.29 945.44 3,769.20 1,119.00 653.47 5,482.14 1,575.74 6,282.00 1,865.00 1,089.12 A-1 Theater 5,000 s.f. III-B, IV, V-B 2,631.43 756.36 3,015.36 895.20 522.78 4,385.72 1,260.59 5,025.60 1,492.00 871.29A-1 Theater 10,000 s.f. I-A, I-B, II-A 4,122.57 1,928.71 4,723.92 2,283.12 955.76 6,870.95 3,214.51 7,873.20 3,805.20 1,592.94 A-1 Theater 10,000 s.f. II-B, III-A, V-A 3,435.48 1,607.25 3,936.60 1,902.60 796.47 5,725.79 2,678.76 6,561.00 3,171.00 1,327.45 A-1 Theater 10,000 s.f. III-B, IV, V-B 2,748.38 1,285.80 3,149.28 1,522.08 637.17 4,580.64 2,143.01 5,248.80 2,536.80 1,061.96 A-1 Theater 20,000 s.f. I-A, I-B, II-A 4,736.57 2,779.61 5,427.72 3,290.40 1,201.94 7,894.29 4,632.68 9,046.20 5,484.00 2,003.24 A-1 Theater 20,000 s.f. II-B, III-A, V-A 3,947.14 2,316.34 4,523.10 2,742.00 1,001.62 6,578.57 3,860.56 7,538.50 4,570.00 1,669.36 A-1 Theater 20,000 s.f. III-B, IV, V-B 3,157.71 1,853.07 3,618.48 2,193.60 801.29 5,262.86 3,088.45 6,030.80 3,656.00 1,335.49 A-1 Theater 50,000 s.f. I-A, I-B, II-A 6,052.29 3,346.87 6,935.40 3,962.16 1,498.40 10,087.14 5,578.12 11,559.00 6,603.60 2,497.34A-1 Theater 50,000 s.f. II-B, III-A, V-A 5,043.57 2,789.06 5,779.50 3,301.80 1,248.67 8,405.95 4,648.43 9,632.50 5,503.00 2,081.11 A-1 Theater 50,000 s.f. III-B, IV, V-B 4,034.86 2,231.25 4,623.60 2,641.44 998.93 6,724.76 3,718.75 7,706.00 4,402.40 1,664.89 A-1 Theater 100,000 s.f. I-A, I-B, II-A 8,420.57 3,970.86 9,649.08 4,700.88 1,958.52 14,034.29 6,618.11 16,081.80 7,834.80 3,264.20 A-1 Theater 100,000 s.f. II-B, III-A, V-A 7,017.14 3,309.05 8,040.90 3,917.40 1,632.10 11,695.24 5,515.09 13,401.50 6,529.00 2,720.17 A-1 Theater 100,000 s.f. III-B, IV, V-B 5,613.72 2,647.24 6,432.72 3,133.92 1,305.68 9,356.19 4,412.07 10,721.20 5,223.20 2,176.14 A-2 Nightclub 1,000 s.f. I-A, I-B, II-A 2,368.29 453.81 2,713.68 537.12 428.70 3,947.14 756.36 4,522.80 895.20 714.50 A-2 Nightclub 1,000 s.f. II-B, III-A, V-A 1,973.57 378.18 2,261.40 447.60 357.25 3,289.29 630.30 3,769.00 746.00 595.42A-2 Nightclub 1,000 s.f. III-B, IV, V-B 1,578.86 302.54 1,809.12 358.08 285.80 2,631.43 504.24 3,015.20 596.80 476.33A-2 Nightclub 5,000 s.f. I-A, I-B, II-A 3,859.43 964.35 4,422.24 1,141.56 740.02 6,432.38 1,607.25 7,370.40 1,902.60 1,233.36 A-2 Nightclub 5,000 s.f. II-B, III-A, V-A 3,216.19 803.63 3,685.20 951.30 616.68 5,360.32 1,339.38 6,142.00 1,585.50 1,027.80 A-2 Nightclub 5,000 s.f. III-B, IV, V-B 2,572.95 642.90 2,948.16 761.04 493.35 4,288.25 1,071.50 4,913.60 1,268.40 822.24 A-2 Nightclub 10,000 s.f. I-A, I-B, II-A 3,947.14 1,701.80 4,523.04 2,014.56 888.66 6,578.57 2,836.33 7,538.40 3,357.60 1,481.10 A-2 Nightclub 10,000 s.f. II-B, III-A, V-A 3,289.29 1,418.17 3,769.20 1,678.80 740.55 5,482.14 2,363.61 6,282.00 2,798.00 1,234.25 A-2 Nightclub 10,000 s.f. III-B, IV, V-B 2,631.43 1,134.53 3,015.36 1,343.04 592.44 4,385.72 1,890.89 5,025.60 2,238.40 987.40 A-2 Nightclub 20,000 s.f. I-A, I-B, II-A 4,736.57 2,382.52 5,427.72 2,820.24 1,128.87 7,894.29 3,970.86 9,046.20 4,700.40 1,881.45 A-2 Nightclub 20,000 s.f. II-B, III-A, V-A 3,947.14 1,985.43 4,523.10 2,350.20 940.72 6,578.57 3,309.05 7,538.50 3,917.00 1,567.87 A-2 Nightclub 20,000 s.f. III-B, IV, V-B 3,157.71 1,588.35 3,618.48 1,880.16 752.58 5,262.86 2,647.24 6,030.80 3,133.60 1,254.30 A-2 Nightclub 50,000 s.f. I-A, I-B, II-A 5,964.57 2,836.33 6,834.60 3,357.72 1,391.42 9,940.95 4,727.22 11,391.00 5,596.20 2,319.03 A-2 Nightclub 50,000 s.f. II-B, III-A, V-A 4,970.48 2,363.61 5,695.50 2,798.10 1,159.51 8,284.13 3,939.35 9,492.50 4,663.50 1,932.52A-2 Nightclub 50,000 s.f. III-B, IV, V-B 3,976.38 1,890.89 4,556.40 2,238.48 927.61 6,627.30 3,151.48 7,594.00 3,730.80 1,546.02 A-2 Nightclub 100,000 s.f. I-A, I-B, II-A 8,332.86 3,687.23 9,548.64 4,365.00 1,893.55 13,888.10 6,145.39 15,914.40 7,275.00 3,155.92A-2 Nightclub 100,000 s.f. II-B, III-A, V-A 6,944.05 3,072.69 7,957.20 3,637.50 1,577.96 11,573.42 5,121.15 13,262.00 6,062.50 2,629.93 A-2 Nightclub 100,000 s.f. III-B, IV, V-B 5,555.24 2,458.15 6,365.76 2,910.00 1,262.37 9,258.73 4,096.92 10,609.60 4,850.00 2,103.94A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. I-A, I-B, II-A 2,894.57 510.54 3,316.68 604.08 515.65 4,824.29 850.90 5,527.80 1,006.80 859.41 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. II-B, III-A, V-A 2,412.14 425.45 2,763.90 503.40 429.71 4,020.24 709.08 4,606.50 839.00 716.18 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. III-B, IV, V-B 1,929.71 340.36 2,211.12 402.72 343.77 3,216.19 567.27 3,685.20 671.20 572.94A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. I-A, I-B, II-A 4,473.43 1,021.08 5,126.04 1,208.52 840.05 7,455.72 1,701.80 8,543.40 2,014.20 1,400.09 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. II-B, III-A, V-A 3,727.86 850.90 4,271.70 1,007.10 700.04 6,213.10 1,418.17 7,119.50 1,678.50 1,166.74 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. III-B, IV, V-B 2,982.29 680.72 3,417.36 805.68 560.03 4,970.48 1,134.53 5,695.60 1,342.80 933.39A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. I-A, I-B, II-A 4,648.86 1,815.25 5,326.92 2,148.84 1,011.65 7,748.10 3,025.42 8,878.20 3,581.40 1,686.08 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. II-B, III-A, V-A 3,874.05 1,512.71 4,439.10 1,790.70 843.04 6,456.75 2,521.18 7,398.50 2,984.50 1,405.07 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. III-B, IV, V-B 3,099.24 1,210.17 3,551.28 1,432.56 674.43 5,165.40 2,016.95 5,918.80 2,387.60 1,124.05 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. I-A, I-B, II-A 5,175.14 2,552.70 5,930.28 3,021.84 1,224.28 8,625.24 4,254.50 9,883.80 5,036.40 2,040.46
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Budget Fiscal Year 2026 Page 84 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. II-B, III-A, V-A 4, 2,127.25 312.62 4,941.90 2,518.20 1,020.23 7,187.70 3,545.41 8,236.50 4,197.00 1,700.39 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. III-B, IV, V-B 3, 1,701.80 450.10 3,953.52 2,014.56 816.18 5,750.16 2,836.33 6,589.20 3,357.60 1,360.31 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. I-A, I-B, II-A 6,227.72 3,063.24 7,136.28 3,626.28 1,471.61 10,379.53 5,105.40 11,893.80 6,043.80 2,452.68 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. II-B, III-A, V-A 5, 2,552.70 189.76 5,946.90 3,021.90 1,226.34 8,649.60 4,254.50 9,911.50 5,036.50 2,043.90 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. III-B, IV, V-B 4, 2,042.16 151.81 4,757.52 2,417.52 981.07 6,919.68 3,403.60 7,929.20 4,029.20 1,635.12 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. I-A, I-B, II-A 7,017.14 3,970.86 8,040.96 4,700.88 1,753.83 11,695.24 6,618.11 13,401.60 7,834.80 2,923.05 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. II-B, III-A, V-A 5, 3,309.05 847.62 6,700.80 3,917.40 1,461.53 9,746.03 5,515.09 11,168.00 6,529.00 2,435.88A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. III-B, IV, V-B 4, 2,647.24 678.10 5,360.64 3,133.92 1,169.22 7,796.83 4,412.07 8,934.40 5,223.20 1,948.70 A-4 Arena 5,000 s.f. I-A, I-B, II-A 4,473.43 964.35 5,126.04 1,141.56 829.82 7,455.72 1,607.25 8,543.40 1,902.60 1,383.03 A-4 Arena 5,000 s.f. II-B, III-A, V-A 3,727.86 803.63 4,271.70 951.30 691.51 6,213.10 1,339.38 7,119.50 1,585.50 1,152.52 A-4 Arena 5,000 s.f. III-B, IV, V-B 2,982.29 642.90 3,417.36 761.04 553.21 4,970.48 1,071.50 5,695.60 1,268.40 922.02 A-4 Arena 10,000 s.f. I-A, I-B, II-A 4,648.86 1,701.80 5,326.92 2,014.56 990.82 7,748.10 2,836.33 8,878.20 3,357.60 1,651.37A-4 Arena 10,000 s.f. II-B, III-A, V-A 3,874.05 1,418.17 4,439.10 1,678.80 825.69 6,456.75 2,363.61 7,398.50 2,798.00 1,376.14 A-4 Arena 10,000 s.f. III-B, IV, V-B 3,099.24 1,134.53 3,551.28 1,343.04 660.55 5,165.40 1,890.89 5,918.80 2,238.40 1,100.91 A-4 Arena 20,000 s.f. I-A, I-B, II-A 5,526.00 2,439.25 6,332.04 2,887.56 1,254.35 9,210.00 4,065.41 10,553.40 4,812.60 2,090.59 A-4 Arena 20,000 s.f. II-B, III-A, V-A 4,605.00 2,032.70 5,276.70 2,406.30 1,045.29 7,675.00 3,387.84 8,794.50 4,010.50 1,742.16 A-4 Arena 20,000 s.f. III-B, IV, V-B 3,684.00 1,626.16 4,221.36 1,925.04 836.24 6,140.00 2,710.27 7,035.60 3,208.40 1,393.73 A-4 Arena 50,000 s.f. I-A, I-B, II-A 7,017.14 2,949.79 8,040.96 3,492.00 1,566.03 11,695.24 4,916.31 13,401.60 5,820.00 2,610.05 A-4 Arena 50,000 s.f. II-B, III-A, V-A 5,847.62 2,458.15 6,700.80 2,910.00 1,305.03 9,746.03 4,096.92 11,168.00 4,850.00 2,175.04A-4 Arena 50,000 s.f. III-B, IV, V-B 4,678.10 1,966.52 5,360.64 2,328.00 1,044.02 7,796.83 3,277.54 8,934.40 3,880.00 1,740.03 A-4 Arena 100,000 s.f. I-A, I-B, II-A 9,736.29 3,800.68 11,156.76 4,499.28 2,119.07 16,227.15 6,334.47 18,594.60 7,498.80 3,531.78 A-4 Arena 100,000 s.f. II-B, III-A, V-A 8,113.57 3,167.24 9,297.30 3,749.40 1,765.89 13,522.62 5,278.73 15,495.50 6,249.00 2,943.15 A-4 Arena 100,000 s.f. III-B, IV, V-B 6,490.86 2,533.79 7,437.84 2,999.52 1,412.71 10,818.10 4,222.98 12,396.40 4,999.20 2,354.52A-5 Stadium 1,000 s.f. I-A, I-B, II-A 2,017.43 510.54 2,311.56 604.08 387.67 3,362.38 850.90 3,852.60 1,006.80 646.12A-5 Stadium 1,000 s.f. II-B, III-A, V-A 1,681.19 425.45 1,926.30 503.40 323.06 2,801.98 709.08 3,210.50 839.00 538.43 A-5 Stadium 1,000 s.f. III-B, IV, V-B 1,344.95 340.36 1,541.04 402.72 258.45 2,241.59 567.27 2,568.40 671.20 430.75 A-5 Stadium 5,000 s.f. I-A, I-B, II-A 3,070.00 964.35 3,517.92 1,141.56 625.13 5,116.67 1,607.25 5,863.20 1,902.60 1,041.88A-5 Stadium 5,000 s.f. II-B, III-A, V-A 2,558.33 803.63 2,931.60 951.30 520.94 4,263.89 1,339.38 4,886.00 1,585.50 868.23 A-5 Stadium 5,000 s.f. III-B, IV, V-B 2,046.67 642.90 2,345.28 761.04 416.75 3,411.11 1,071.50 3,908.80 1,268.40 694.59 A-5 Stadium 10,000 s.f. I-A, I-B, II-A 3,157.71 1,701.80 3,618.36 2,014.56 773.41 5,262.86 2,836.33 6,030.60 3,357.60 1,289.01A-5 Stadium 10,000 s.f. II-B, III-A, V-A 2,631.43 1,418.17 3,015.30 1,678.80 644.50 4,385.72 2,363.61 5,025.50 2,798.00 1,074.17 A-5 Stadium 10,000 s.f. III-B, IV, V-B 2,105.14 1,134.53 2,412.24 1,343.04 515.60 3,508.57 1,890.89 4,020.40 2,238.40 859.34 A-5 Stadium 20,000 s.f. I-A, I-B, II-A 3,684.00 2,439.25 4,221.36 2,887.56 985.67 6,140.00 4,065.41 7,035.60 4,812.60 1,642.79 A-5 Stadium 20,000 s.f. II-B, III-A, V-A 3,070.00 2,032.70 3,517.80 2,406.30 821.39 5,116.67 3,387.84 5,863.00 4,010.50 1,368.99 A-5 Stadium 20,000 s.f. III-B, IV, V-B 2,456.00 1,626.16 2,814.24 1,925.04 657.12 4,093.33 2,710.27 4,690.40 3,208.40 1,095.19 A-5 Stadium 50,000 s.f. I-A, I-B, II-A 4,648.86 2,949.79 5,326.92 3,492.00 1,220.28 7,748.10 4,916.31 8,878.20 5,820.00 2,033.79A-5 Stadium 50,000 s.f. II-B, III-A, V-A 3,874.05 2,458.15 4,439.10 2,910.00 1,016.90 6,456.75 4,096.92 7,398.50 4,850.00 1,694.83 A-5 Stadium 50,000 s.f. III-B, IV, V-B 3,099.24 1,966.52 3,551.28 2,328.00 813.52 5,165.40 3,277.54 5,918.80 3,880.00 1,355.86 A-5 Stadium 100,000 s.f. I-A, I-B, II-A 5,262.86 3,857.41 6,030.72 4,566.60 1,477.05 8,771.43 6,429.02 10,051.20 7,611.00 2,461.75 A-5 Stadium 100,000 s.f. II-B, III-A, V-A 4,385.72 3,214.51 5,025.60 3,805.50 1,230.88 7,309.53 5,357.52 8,376.00 6,342.50 2,051.46 A-5 Stadium 100,000 s.f. III-B, IV, V-B 3,508.57 2,571.61 4,020.48 3,044.40 984.70 5,847.62 4,286.01 6,700.80 5,074.00 1,641.17 B Office 1,000 s.f. I-A, I-B, II-A 3,420.86 623.99 3,919.68 738.36 613.19 5,701.43 1,039.99 6,532.80 1,230.60 1,021.98 B Office 1,000 s.f. II-B, III-A, V-A 2,850.71 519.99 3,266.40 615.30 510.99 4,751.19 866.66 5,444.00 1,025.50 851.65 B Office 1,000 s.f. III-B, IV, V-B 2,280.57 416.00 2,613.12 492.24 408.79 3,800.95 693.33 4,355.20 820.40 681.32 B Office 5,000 s.f. I-A, I-B, II-A 5,613.72 1,304.71 6,432.84 1,544.40 1,058.81 9,356.19 2,174.52 10,721.40 2,574.00 1,764.69 B Office 5,000 s.f. II-B, III-A, V-A 4,678.10 1,087.26 5,360.70 1,287.00 882.34 7,796.83 1,812.10 8,934.50 2,145.00 1,470.57 Budget Fiscal Year 2026 Page 85 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
B Office 5,000 s.f. III-B, IV, V-B 869.81 3,742.48 4,288.56 1,029.60 705.87 6,237.46 1,449.68 7,147.60 1,716.00 1,176.46B Office 10,000 s.f. I-A, I-B, II-A 2,269.07 5,789.14 6,633.72 2,685.96 1,261.47 9,648.57 3,781.78 11,056.20 4,476.60 2,102.45 B Office 10,000 s.f. II-B, III-A, V-A 1,890.89 4,824.29 5,528.10 2,238.30 1,051.23 8,040.48 3,151.48 9,213.50 3,730.50 1,752.04B Office 10,000 s.f. III-B, IV, V-B 1,512.71 3,859.43 4,422.48 1,790.64 840.98 6,432.38 2,521.18 7,370.80 2,984.40 1,401.63 B Office 20,000 s.f. I-A, I-B, II-A 3,233.42 6,929.43 7,940.52 3,827.88 1,605.55 11,549.05 5,389.03 13,234.20 6,379.80 2,675.92 B Office 20,000 s.f. II-B, III-A, V-A 2,694.52 5,774.52 6,617.10 3,189.90 1,337.96 9,624.21 4,490.86 11,028.50 5,316.50 2,229.93 B Office 20,000 s.f. III-B, IV, V-B 2,155.61 4,619.62 5,293.68 2,551.92 1,070.37 7,699.37 3,592.69 8,822.80 4,253.20 1,783.95 B Office 50,000 s.f. I-A, I-B, II-A 3,914.14 8,683.72 9,950.76 4,633.56 1,986.47 14,472.86 6,523.56 16,584.60 7,722.60 3,310.78 B Office 50,000 s.f. II-B, III-A, V-A 7,236.43 3,261.78 8,292.30 3,861.30 1,655.39 12,060.72 5,436.30 13,820.50 6,435.50 2,758.98 B Office 50,000 s.f. III-B, IV, V-B 5,789.14 2,609.43 6,633.84 3,089.04 1,324.31 9,648.57 4,349.04 11,056.40 5,148.40 2,207.18 B Office 10,000 s.f. I-A, I-B, II-A 10,174.86 4,878.49 11,659.32 5,775.12 2,381.09 16,958.10 8,130.82 19,432.20 9,625.20 3,968.48 B Office 10,000 s.f. II-B, III-A, V-A 8,479.05 4,065.41 9,716.10 4,812.60 1,984.24 14,131.75 6,775.68 16,193.50 8,021.00 3,307.07 B Office 10,000 s.f. III-B, IV, V-B 6,783.24 3,252.33 7,772.88 3,850.08 1,587.39 11,305.40 5,420.55 12,954.80 6,416.80 2,645.66 B Office 200,000 s.f. I-A, I-B, II-A 17,981.43 8,735.90 20,604.96 10,341.72 4,229.35 29,969.05 14,559.84 34,341.60 17,236.20 7,048.91 B Office 200,000 s.f. II-B, III-A, V-A 14,984.53 7,279.92 17,170.80 8,618.10 3,524.45 24,974.21 12,133.20 28,618.00 14,363.50 5,874.09 B Office 200,000 s.f. III-B, IV, V-B 11,987.62 5,823.94 13,736.64 6,894.48 2,819.56 19,979.37 9,706.56 22,894.40 11,490.80 4,699.27 B Office 500,000 s.f. I-A, I-B, II-A 20,612.86 10,721.33 23,620.32 12,692.16 4,978.28 34,354.77 17,868.89 39,367.20 21,153.60 8,297.14 B Office 500,000 s.f. II-B, III-A, V-A 17,177.38 8,934.45 19,683.60 10,576.80 4,148.57 28,628.97 14,890.74 32,806.00 17,628.00 6,914.28 B Office 500,000 s.f. III-B, IV, V-B 13,741.91 7,147.56 15,746.88 8,461.44 3,318.86 22,903.18 11,912.59 26,244.80 14,102.40 5,531.43 B Office 1,000,000 s.f. I-A, I-B, II-A 29,121.15 13,727.85 33,370.20 16,251.48 6,772.68 48,535.25 22,879.74 55,617.00 27,085.80 11,287.81 B Office 1,000,000 s.f. II-B, III-A, V-A 24,267.62 11,439.87 27,808.50 13,542.90 5,643.90 40,446.04 19,066.45 46,347.50 22,571.50 9,406.51 B Office 1,000,000 s.f. III-B, IV, V-B 19,414.10 9,151.90 22,246.80 10,834.32 4,515.12 32,356.83 15,253.16 37,078.00 18,057.20 7,525.20 B Medical Office 1,000 s.f. I-A, I-B, II-A 3,596.29 623.99 4,120.92 738.36 639.00 5,993.81 1,039.99 6,868.20 1,230.60 1,065.00 B Medical Office 1,000 s.f. II-B, III-A, V-A 2,996.91 519.99 3,434.10 615.30 532.50 4,994.84 866.66 5,723.50 1,025.50 887.50 B Medical Office 1,000 s.f. III-B, IV, V-B 2,397.52 416.00 2,747.28 492.24 426.00 3,995.87 693.33 4,578.80 820.40 710.00 B Medical Office 5,000 s.f. I-A, I-B, II-A 5,789.14 1,304.71 6,633.72 1,544.40 1,084.26 9,648.57 2,174.52 11,056.20 2,574.00 1,807.11 B Medical Office 5,000 s.f. II-B, III-A, V-A 4,824.29 1,087.26 5,528.10 1,287.00 903.55 8,040.48 1,812.10 9,213.50 2,145.00 1,505.92 B Medical Office 5,000 s.f. III-B, IV, V-B 3,859.43 869.81 4,422.48 1,029.60 722.84 6,432.38 1,449.68 7,370.80 1,716.00 1,204.74 B Medical Office 10,000 s.f. I-A, I-B, II-A 5,964.57 2,269.07 6,834.60 2,685.96 1,286.92 9,940.95 3,781.78 11,391.00 4,476.60 2,144.87 B Medical Office 10,000 s.f. II-B, III-A, V-A 4,970.48 1,890.89 5,695.50 2,238.30 1,072.43 8,284.13 3,151.48 9,492.50 3,730.50 1,787.39 B Medical Office 10,000 s.f. III-B, IV, V-B 3,976.38 1,512.71 4,556.40 1,790.64 857.95 6,627.30 2,521.18 7,594.00 2,984.40 1,429.91 B Medical Office 20,000 s.f. I-A, I-B, II-A 7,104.86 3,290.15 8,141.40 3,894.84 1,641.24 11,841.43 5,483.58 13,569.00 6,491.40 2,735.39 B Medical Office 20,000 s.f. II-B, III-A, V-A 5,920.72 2,741.79 6,784.50 3,245.70 1,367.70 9,867.86 4,569.65 11,307.50 5,409.50 2,279.49 B Medical Office 20,000 s.f. III-B, IV, V-B 4,736.57 2,193.43 5,427.60 2,596.56 1,094.16 7,894.29 3,655.72 9,046.00 4,327.60 1,823.60 B Medical Office 50,000 s.f. I-A, I-B, II-A 8,859.14 3,914.14 10,151.64 4,633.56 2,011.92 14,765.24 6,523.56 16,919.40 7,722.60 3,353.20B Medical Office 50,000 s.f. II-B, III-A, V-A 7,382.62 3,261.78 8,459.70 3,861.30 1,676.60 12,304.37 5,436.30 14,099.50 6,435.50 2,794.33 B Medical Office 50,000 s.f. III-B, IV, V-B 5,906.10 2,609.43 6,767.76 3,089.04 1,341.28 9,843.49 4,349.04 11,279.60 5,148.40 2,235.46B Medical Office 100,000 s.f. I-A, I-B, II-A 12,630.86 4,708.31 14,473.80 5,573.88 2,708.51 21,051.43 7,847.19 24,123.00 9,289.80 4,514.18 B Medical Office 100,000 s.f. II-B, III-A, V-A 10,525.72 3,923.59 12,061.50 4,644.90 2,257.09 17,542.86 6,539.32 20,102.50 7,741.50 3,761.82 B Medical Office 100,000 s.f. III-B, IV, V-B 8,420.57 3,138.87 9,649.20 3,715.92 1,805.67 14,034.29 5,231.46 16,082.00 6,193.20 3,009.45 B Restaurant <50 occupants 1,000 s.f. I-A, I-B, II-A 2,982.29 1,021.08 3,417.12 1,208.52 622.27 4,970.48 1,701.80 5,695.20 2,014.20 1,037.12 B Restaurant <50 occupants 1,000 s.f. II-B, III-A, V-A 2,485.24 850.90 2,847.60 1,007.10 518.56 4,142.06 1,418.17 4,746.00 1,678.50 864.27 B Restaurant <50 occupants 1,000 s.f. III-B, IV, V-B 1,988.19 680.72 2,278.08 805.68 414.85 3,313.65 1,134.53 3,796.80 1,342.80 691.42 B Restaurant <50 occupants 2,000 s.f. I-A, I-B, II-A 3,684.00 1,191.26 4,221.36 1,410.12 756.22 6,140.00 1,985.43 7,035.60 2,350.20 1,260.37 B Restaurant <50 occupants 2,000 s.f. II-B, III-A, V-A 3,070.00 992.72 3,517.80 1,175.10 630.18 5,116.67 1,654.53 5,863.00 1,958.50 1,050.31 B Restaurant <50 occupants 2,000 s.f. III-B, IV, V-B 2,456.00 794.17 2,814.24 940.08 504.15 4,093.33 1,323.62 4,690.40 1,566.80 840.24 Budget Fiscal Year 2026 Page 86 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
B Restaurant <50 occupants 5,000 s.f. I-A, I-B, II-A 4,210.29 1,588.35 4,824.36 1,880.28 906.01 7,017.14 2,647.24 8,040.60 3,133.80 1,510.01 B Restaurant <50 occupants 5,000 s.f. II-B, III-A, V-A 3,508.57 1,323.62 4,020.30 1,566.90 755.01 5,847.62 2,206.04 6,700.50 2,611.50 1,258.34 B Restaurant <50 occupants 5,000 s.f. III-B, IV, V-B 2,806.86 1,058.90 3,216.24 1,253.52 604.01 4,678.10 1,764.83 5,360.40 2,089.20 1,006.68 B Restaurant <50 occupants 10,000 s.f. I-A, I-B, II-A 4,999.72 3,800.68 5,729.04 4,499.28 1,427.92 8,332.86 6,334.47 9,548.40 7,498.80 2,379.87 B Restaurant <50 occupants 10,000 s.f. II-B, III-A, V-A 4,166.43 3,167.24 4,774.20 3,749.40 1,189.93 6,944.05 5,278.73 7,957.00 6,249.00 1,983.22 B Restaurant <50 occupants 10,000 s.f. III-B, IV, V-B 3,333.14 2,533.79 3,819.36 2,999.52 951.95 5,555.24 4,222.98 6,365.60 4,999.20 1,586.58 E Educational 1,000 s.f. I-A, I-B, II-A 2,631.43 453.81 3,015.36 537.12 467.24 4,385.72 756.36 5,025.60 895.20 778.73 E Educational 1,000 s.f. II-B, III-A, V-A 2,192.86 378.18 2,512.80 447.60 389.36 3,654.76 630.30 4,188.00 746.00 648.94 E Educational 1,000 s.f. III-B, IV, V-B 1,754.29 302.54 2,010.24 358.08 311.49 2,923.81 504.24 3,350.40 596.80 519.15 E Educational 5,000 s.f. I-A, I-B, II-A 3,947.14 964.35 4,523.04 1,141.56 753.10 6,578.57 1,607.25 7,538.40 1,902.60 1,255.17 E Educational 5,000 s.f. II-B, III-A, V-A 3,289.29 803.63 3,769.20 951.30 627.59 5,482.14 1,339.38 6,282.00 1,585.50 1,045.98 E Educational 5,000 s.f. III-B, IV, V-B 2,631.43 642.90 3,015.36 761.04 502.07 4,385.72 1,071.50 5,025.60 1,268.40 836.78 E Educational 10,000 s.f. I-A, I-B, II-A 4,122.57 1,701.80 4,723.92 2,014.56 914.11 6,870.95 2,836.33 7,873.20 3,357.60 1,523.51E Educational 10,000 s.f. II-B, III-A, V-A 3,435.48 1,418.17 3,936.60 1,678.80 761.76 5,725.79 2,363.61 6,561.00 2,798.00 1,269.60 E Educational 10,000 s.f. III-B, IV, V-B 2,748.38 1,134.53 3,149.28 1,343.04 609.41 4,580.64 1,890.89 5,248.80 2,238.40 1,015.68 E Educational 20,000 s.f. I-A, I-B, II-A 4,912.00 2,439.25 5,628.60 2,887.56 1,164.91 8,186.67 4,065.41 9,381.00 4,812.60 1,941.52E Educational 20,000 s.f. II-B, III-A, V-A 4,093.33 2,032.70 4,690.50 2,406.30 970.76 6,822.22 3,387.84 7,817.50 4,010.50 1,617.94 E Educational 20,000 s.f. III-B, IV, V-B 3,274.67 1,626.16 3,752.40 1,925.04 776.61 5,457.78 2,710.27 6,254.00 3,208.40 1,294.35 E Educational 50,000 s.f. I-A, I-B, II-A 6,227.72 2,893.06 7,136.28 3,424.68 1,440.19 10,379.53 4,821.76 11,893.80 5,707.80 2,400.31 E Educational 50,000 s.f. II-B, III-A, V-A 5,189.76 2,410.88 5,946.90 2,853.90 1,200.15 8,649.60 4,018.14 9,911.50 4,756.50 2,000.26 E Educational 50,000 s.f. III-B, IV, V-B 4,151.81 1,928.71 4,757.52 2,283.12 960.12 6,919.68 3,214.51 7,929.20 3,805.20 1,600.21 E Educational 100,000 s.f. I-A, I-B, II-A 8,683.72 3,743.96 9,950.76 4,431.96 1,955.05 14,472.86 6,239.93 16,584.60 7,386.60 3,258.41E Educational 100,000 s.f. II-B, III-A, V-A 7,236.43 3,119.97 8,292.30 3,693.30 1,629.20 12,060.72 5,199.94 13,820.50 6,155.50 2,715.34 E Educational 100,000 s.f. III-B, IV, V-B 5,789.14 2,495.97 6,633.84 2,954.64 1,303.36 9,648.57 4,159.95 11,056.40 4,924.40 2,172.27F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. I-A, I-B, II-A 2,280.57 453.81 2,613.24 537.12 415.97 3,800.95 756.36 4,355.40 895.20 693.29 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. II-B, III-A, V-A 1,900.48 378.18 2,177.70 447.60 346.65 3,167.46 630.30 3,629.50 746.00 577.74 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. III-B, IV, V-B 1,520.38 302.54 1,742.16 358.08 277.32 2,533.97 504.24 2,903.60 596.80 462.19 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. I-A, I-B, II-A 3,420.86 964.35 3,919.68 1,141.56 676.03 5,701.43 1,607.25 6,532.80 1,902.60 1,126.72 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. II-B, III-A, V-A 2,850.71 803.63 3,266.40 951.30 563.36 4,751.19 1,339.38 5,444.00 1,585.50 938.93 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. III-B, IV, V-B 2,280.57 642.90 2,613.12 761.04 450.69 3,800.95 1,071.50 4,355.20 1,268.40 751.14 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. I-A, I-B, II-A 3,596.29 1,701.80 4,120.92 2,014.56 837.39 5,993.81 2,836.33 6,868.20 3,357.60 1,395.66 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. II-B, III-A, V-A 2,996.91 1,418.17 3,434.10 1,678.80 697.83 4,994.84 2,363.61 5,723.50 2,798.00 1,163.05 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. III-B, IV, V-B 2,397.52 1,134.53 2,747.28 1,343.04 558.26 3,995.87 1,890.89 4,578.80 2,238.40 930.44 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. I-A, I-B, II-A 4,210.29 2,098.89 4,824.36 2,484.72 999.91 7,017.14 3,498.14 8,040.60 4,141.20 1,666.51 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. II-B, III-A, V-A 3,508.57 1,749.07 4,020.30 2,070.60 833.26 5,847.62 2,915.12 6,700.50 3,451.00 1,388.76 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. III-B, IV, V-B 2,806.86 1,399.26 3,216.24 1,656.48 666.61 4,678.10 2,332.10 5,360.40 2,760.80 1,111.01 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. I-A, I-B, II-A 4,999.72 2,439.25 5,729.04 2,887.56 1,177.64 8,332.86 4,065.41 9,548.40 4,812.60 1,962.73 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. II-B, III-A, V-A 4,166.43 2,032.70 4,774.20 2,406.30 981.37 6,944.05 3,387.84 7,957.00 4,010.50 1,635.61 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. III-B, IV, V-B 3,333.14 1,626.16 3,819.36 1,925.04 785.09 5,555.24 2,710.27 6,365.60 3,208.40 1,308.49 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. I-A, I-B, II-A 5,262.86 3,233.42 6,030.72 3,827.88 1,362.32 8,771.43 5,389.03 10,051.20 6,379.80 2,270.54 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. II-B, III-A, V-A 4,385.72 2,694.52 5,025.60 3,189.90 1,135.27 7,309.53 4,490.86 8,376.00 5,316.50 1,892.12F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. III-B, IV, V-B 3,508.57 2,155.61 4,020.48 2,551.92 908.22 5,847.62 3,592.69 6,700.80 4,253.20 1,513.69 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. I-A, I-B, II-A 1,754.29 1,418.17 2,010.24 1,678.68 516.47 2,923.81 2,363.61 3,350.40 2,797.80 860.78 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. II-B, III-A, V-A 1,461.91 1,181.80 1,675.20 1,398.90 430.39 2,436.51 1,969.67 2,792.00 2,331.50 717.32 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. III-B, IV, V-B 1,169.52 945.44 1,340.16 1,119.12 344.31 1,949.21 1,575.74 2,233.60 1,865.20 573.85 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. I-A, I-B, II-A 2,631.43 1,871.98 3,015.36 2,215.80 727.75 4,385.72 3,119.97 5,025.60 3,693.00 1,212.92 Budget Fiscal Year 2026 Page 87 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. II-B, III-A, V-A 2, 1,559.98 192.86 2,512.80 1,846.50 606.46 3,654.76 2,599.97 4,188.00 3,077.50 1,010.77 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. III-B, IV, V-B 1, 1,247.99 754.29 2,010.24 1,477.20 485.17 2,923.81 2,079.98 3,350.40 2,462.00 808.61 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. I-A, I-B, II-A 2,894.57 2,382.52 3,316.68 2,820.24 859.83 4,824.29 3,970.86 5,527.80 4,700.40 1,433.05 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. II-B, III-A, V-A 2, 1,985.43 412.14 2,763.90 2,350.20 716.52 4,020.24 3,309.05 4,606.50 3,917.00 1,194.21 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. III-B, IV, V-B 1,929.71 1,588.35 2,211.12 1,880.16 573.22 3,216.19 2,647.24 3,685.20 3,133.60 955.37 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. I-A, I-B, II-A 3,157.71 3,119.97 3,618.36 3,693.24 1,033.92 5,262.86 5,199.94 6,030.60 6,155.40 1,723.20 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. II-B, III-A, V-A 2,631.43 2,599.97 3,015.30 3,077.70 861.60 4,385.72 4,333.28 5,025.50 5,129.50 1,436.00 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. III-B, IV, V-B 2,105.14 2,079.98 2,412.24 2,462.16 689.28 3,508.57 3,466.63 4,020.40 4,103.60 1,148.80 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. I-A, I-B, II-A 3,947.14 4,027.59 4,523.04 4,767.84 1,316.14 6,578.57 6,712.65 7,538.40 7,946.40 2,193.57 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. II-B, III-A, V-A 3,289.29 3,356.33 3,769.20 3,973.20 1,096.79 5,482.14 5,593.88 6,282.00 6,622.00 1,827.98 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. III-B, IV, V-B 2,631.43 2,685.06 3,015.36 3,178.56 877.43 4,385.72 4,475.10 5,025.60 5,297.60 1,462.38 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., I-A, I-B, II-A 5,701.43 5,275.58 6,533.28 6,245.28 1,801.55 9,502.38 8,792.63 10,888.80 10,408.80 3,002.59 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., II-B, III-A, V-A 4,751.19 4,396.31 5,444.40 5,204.40 1,501.29 7,918.65 7,327.19 9,074.00 8,674.00 2,502.16 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., III-B, IV, V-B 3,800.95 3,517.05 4,355.52 4,163.52 1,201.04 6,334.92 5,861.75 7,259.20 6,939.20 2,001.73 S-2 Parking Garage 5,000 s.f. I-A, I-B, II-A 2,806.86 1,701.80 3,216.24 2,014.56 722.14 4,678.10 2,836.33 5,360.40 3,357.60 1,203.57 S-2 Parking Garage 5,000 s.f. II-B, III-A, V-A 2,339.05 1,418.17 2,680.20 1,678.80 601.79 3,898.41 2,363.61 4,467.00 2,798.00 1,002.98 S-2 Parking Garage 5,000 s.f. III-B, IV, V-B 1,871.24 1,134.53 2,144.16 1,343.04 481.43 3,118.73 1,890.89 3,573.60 2,238.40 802.38 S-2 Parking Garage 10,000 s.f. I-A, I-B, II-A 4,298.00 2,212.34 4,924.80 2,619.00 1,033.46 7,163.33 3,687.23 8,208.00 4,365.00 1,722.43 S-2 Parking Garage 10,000 s.f. II-B, III-A, V-A 3,581.67 1,843.62 4,104.00 2,182.50 861.22 5,969.45 3,072.69 6,840.00 3,637.50 1,435.36 S-2 Parking Garage 10,000 s.f. III-B, IV, V-B 2,865.33 1,474.89 3,283.20 1,746.00 688.97 4,775.56 2,458.15 5,472.00 2,910.00 1,148.29 S-2 Parking Garage 50,000 s.f. I-A, I-B, II-A 4,473.43 2,893.06 5,126.04 3,424.68 1,184.23 7,455.72 4,821.76 8,543.40 5,707.80 1,973.72 S-2 Parking Garage 50,000 s.f. II-B, III-A, V-A 3,727.86 2,410.88 4,271.70 2,853.90 986.86 6,213.10 4,018.14 7,119.50 4,756.50 1,644.77 S-2 Parking Garage 50,000 s.f. III-B, IV, V-B 2,982.29 1,928.71 3,417.36 2,283.12 789.49 4,970.48 3,214.51 5,695.60 3,805.20 1,315.81 S-2 Parking Garage 100,000 s.f. I-A, I-B, II-A 6,929.43 4,311.22 7,940.52 5,103.72 1,803.59 11,549.05 7,185.37 13,234.20 8,506.20 3,005.98 S-2 Parking Garage 100,000 s.f. II-B, III-A, V-A 5,774.52 3,592.69 6,617.10 4,253.10 1,502.99 9,624.21 5,987.81 11,028.50 7,088.50 2,504.98 S-2 Parking Garage 100,000 s.f. III-B, IV, V-B 4,619.62 2,874.15 5,293.68 3,402.48 1,202.39 7,699.37 4,790.25 8,822.80 5,670.80 2,003.98 S-2 Parking Garage 500,000 s.f. I-A, I-B, II-A 8,420.57 6,466.84 9,649.08 7,655.76 2,417.43 14,034.29 10,778.06 16,081.80 12,759.60 4,029.05S-2 Parking Garage 500,000 s.f. II-B, III-A, V-A 7,017.14 5,389.03 8,040.90 6,379.80 2,014.52 11,695.24 8,981.72 13,401.50 10,633.00 3,357.54 S-2 Parking Garage 500,000 s.f. III-B, IV, V-B 5,613.72 4,311.22 6,432.72 5,103.84 1,611.62 9,356.19 7,185.37 10,721.20 8,506.40 2,686.03S-2 Parking Garage 1,000,000 s.f. I-A, I-B, II-A 11,052.00 12,933.67 12,664.44 15,311.52 3,990.28 18,420.00 21,556.12 21,107.40 25,519.20 6,650.47 S-2 Parking Garage 1,000,000 s.f. II-B, III-A, V-A 9,210.00 10,778.06 10,553.70 12,759.60 3,325.24 15,350.00 17,963.44 17,589.50 21,266.00 5,542.06 S-2 Parking Garage 1,000,000 s.f. III-B, IV, V-B 7,368.00 8,622.45 8,442.96 10,207.68 2,660.19 12,280.00 14,370.75 14,071.60 17,012.80 4,433.65 U Utility/Misc 500 s.f. I-A, I-B, II-A 877.14 510.54 1,005.12 604.08 221.52 1,461.91 850.90 1,675.20 1,006.80 369.20 U Utility/Misc 500 s.f. II-B, III-A, V-A 730.95 425.45 837.60 503.40 184.60 1,218.25 709.08 1,396.00 839.00 307.66 U Utility/Misc 500 s.f. III-B, IV, V-B 584.76 340.36 670.08 402.72 147.68 974.60 567.27 1,116.80 671.20 246.13 U Utility/Misc 2,000 s.f. I-A, I-B, II-A 1,315.71 737.45 1,507.68 873.00 327.52 2,192.86 1,229.08 2,512.80 1,455.00 545.87 U Utility/Misc 2,000 s.f. II-B, III-A, V-A 1,096.43 614.54 1,256.40 727.50 272.93 1,827.38 1,024.23 2,094.00 1,212.50 454.89 U Utility/Misc 2,000 s.f. III-B, IV, V-B 877.14 491.63 1,005.12 582.00 218.35 1,461.91 819.38 1,675.20 970.00 363.91 U Utility/Misc 4,000 s.f. I-A, I-B, II-A 1,491.14 1,531.62 1,708.56 1,812.96 498.76 2,485.24 2,552.70 2,847.60 3,021.60 831.26U Utility/Misc 4,000 s.f. II-B, III-A, V-A 1,242.62 1,276.35 1,423.80 1,510.80 415.63 2,071.03 2,127.25 2,373.00 2,518.00 692.72 U Utility/Misc 4,000 s.f. III-B, IV, V-B 994.10 1,021.08 1,139.04 1,208.64 332.51 1,656.83 1,701.80 1,898.40 2,014.40 554.18 U Utility/Misc 8,000 s.f. I-A, I-B, II-A 1,754.29 1,985.43 2,010.24 2,350.44 620.96 2,923.81 3,309.05 3,350.40 3,917.40 1,034.94 U Utility/Misc 8,000 s.f. II-B, III-A, V-A 1,461.91 1,654.53 1,675.20 1,958.70 517.47 2,436.51 2,757.54 2,792.00 3,264.50 862.45 U Utility/Misc 8,000 s.f. III-B, IV, V-B 1,169.52 1,323.62 1,340.16 1,566.96 413.97 1,949.21 2,206.04 2,233.60 2,611.60 689.96 U Utility/Misc 20,000 s.f. I-A, I-B, II-A 2,192.86 2,495.97 2,512.80 2,954.52 778.49 3,654.76 4,159.95 4,188.00 4,924.20 1,297.48U Utility/Misc 20,000 s.f. II-B, III-A, V-A 1,827.38 2,079.98 2,094.00 2,462.10 648.74 3,045.64 3,466.63 3,490.00 4,103.50 1,081.24 Budget Fiscal Year 2026 Page 88 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
U Utility/Misc 20,000 s.f. III-B, IV, V-B 1, 1,663.98 461.91 1,675.20 1,969.68 518.99 2,436.51 2,773.30 2,792.00 3,282.80 864.99 U Utility/Misc 40,000 s.f. I-A, I-B, II-A 3,333.14 3,006.51 3,819.24 3,558.96 1,038.54 5,555.24 5,010.85 6,365.40 5,931.60 1,730.91 U Utility/Misc 40,000 s.f. II-B, III-A, V-A 2, 2,505.43 777.62 3,182.70 2,965.80 865.45 4,629.37 4,175.71 5,304.50 4,943.00 1,442.42 U Utility/Misc 40,000 s.f. III-B, IV, V-B 2, 2,004.34 222.10 2,546.16 2,372.64 692.36 3,703.49 3,340.57 4,243.60 3,954.40 1,153.94 U Utility/Misc (Associated w R-3 structures) 500 s.f. I-A, I-B, II-A 350.86 226.91 401.76 268.56 92.56 584.76 378.18 669.60 447.60 154.26 U Utility/Misc (Associated w R-3 structures) 500 s.f. II-B, III-A, V-A 189.09 292.38 334.80 223.80 77.13 487.30 315.15 558.00 373.00 128.55 U Utility/Misc (Associated w R-3 structures) 500 s.f. III-B, IV, V-B 151.27 233.90 267.84 179.04 61.70 389.84 252.12 446.40 298.40 102.84 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. I-A, I-B, II-A 526.29 340.36 603.00 402.84 139.19 877.14 567.27 1,005.00 671.40 231.99 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. II-B, III-A, V-A 438.57 283.63 502.50 335.70 116.00 730.95 472.72 837.50 559.50 193.33 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. III-B, IV, V-B 350.86 226.91 402.00 268.56 92.80 584.76 378.18 670.00 447.60 154.66 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. I-A, I-B, II-A 614.00 680.72 703.44 805.68 214.40 1,023.33 1,134.53 1,172.40 1,342.80 357.33 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. II-B, III-A, V-A 511.67 567.27 586.20 671.40 178.67 852.78 945.44 977.00 1,119.00 297.78 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. III-B, IV, V-B 409.33 453.81 468.96 537.12 142.93 682.22 756.36 781.60 895.20 238.22 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. I-A, I-B, II-A 701.71 907.63 803.88 1,074.24 268.78 1,169.52 1,512.71 1,339.80 1,790.40 447.97 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. II-B, III-A, V-A 584.76 756.36 669.90 895.20 223.98 974.60 1,260.59 1,116.50 1,492.00 373.30 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. III-B, IV, V-B 467.81 605.08 535.92 716.16 179.19 779.68 1,008.47 893.20 1,193.60 298.64 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. I-A, I-B, II-A 2,631.43 567.27 3,015.36 671.40 488.06 4,385.72 945.44 5,025.60 1,119.00 813.44 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. II-B, III-A, V-A 2,192.86 472.72 2,512.80 559.50 406.72 3,654.76 787.87 4,188.00 932.50 677.87 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. III-B, IV, V-B 1,754.29 378.18 2,010.24 447.60 325.38 2,923.81 630.30 3,350.40 746.00 542.29 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. I-A, I-B, II-A 3,947.14 1,134.53 4,523.04 1,342.80 784.16 6,578.57 1,890.89 7,538.40 2,238.00 1,306.94H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. II-B, III-A, V-A 3,289.29 945.44 3,769.20 1,119.00 653.47 5,482.14 1,575.74 6,282.00 1,865.00 1,089.12 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. III-B, IV, V-B 2,631.43 756.36 3,015.36 895.20 522.78 4,385.72 1,260.59 5,025.60 1,492.00 871.29 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. I-A, I-B, II-A 4,122.57 1,871.98 4,723.92 2,215.80 945.17 6,870.95 3,119.97 7,873.20 3,693.00 1,575.28 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. II-B, III-A, V-A 3,435.48 1,559.98 3,936.60 1,846.50 787.64 5,725.79 2,599.97 6,561.00 3,077.50 1,312.73 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. III-B, IV, V-B 2,748.38 1,247.99 3,149.28 1,477.20 630.11 4,580.64 2,079.98 5,248.80 2,462.00 1,050.19 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. I-A, I-B, II-A 6,052.29 3,290.15 6,935.40 3,894.84 1,487.81 10,087.14 5,483.58 11,559.00 6,491.40 2,479.68H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. II-B, III-A, V-A 5,043.57 2,741.79 5,779.50 3,245.70 1,239.84 8,405.95 4,569.65 9,632.50 5,409.50 2,066.40 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. III-B, IV, V-B 4,034.86 2,193.43 4,623.60 2,596.56 991.87 6,724.76 3,655.72 7,706.00 4,327.60 1,653.12 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. I-A, I-B, II-A 8,245.14 4,254.50 9,448.20 5,036.40 1,984.96 13,741.91 7,090.83 15,747.00 8,394.00 3,308.26 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. II-B, III-A, V-A 6,870.95 3,545.41 7,873.50 4,197.00 1,654.13 11,451.59 5,909.02 13,122.50 6,995.00 2,756.89H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. III-B, IV, V-B 5,496.76 2,836.33 6,298.80 3,357.60 1,323.31 9,161.27 4,727.22 10,498.00 5,596.00 2,205.51H-5 HPM, 1,000 s.f. I-A, I-B, II-A 3,859.43 453.81 4,422.24 537.12 646.12 6,432.38 756.36 7,370.40 895.20 1,076.86 H-5 HPM, 1,000 s.f. II-B, III-A, V-A 3,216.19 378.18 3,685.20 447.60 538.43 5,360.32 630.30 6,142.00 746.00 897.39 H-5 HPM, 1,000 s.f. III-B, IV, V-B 2,572.95 302.54 2,948.16 358.08 430.75 4,288.25 504.24 4,913.60 596.80 717.91 H-5 HPM, 5,000 s.f. I-A, I-B, II-A 5,964.57 964.35 6,834.60 1,141.56 1,047.23 9,940.95 1,607.25 11,391.00 1,902.60 1,745.39 H-5 HPM, 5,000 s.f. II-B, III-A, V-A 4,970.48 803.63 5,695.50 951.30 872.70 8,284.13 1,339.38 9,492.50 1,585.50 1,454.49 H-5 HPM, 5,000 s.f. III-B, IV, V-B 3,976.38 642.90 4,556.40 761.04 698.16 6,627.30 1,071.50 7,594.00 1,268.40 1,163.59 H-5 HPM, 10,000 s.f. I-A, I-B, II-A 6,227.72 1,645.07 7,136.28 1,947.24 1,210.73 10,379.53 2,741.79 11,893.80 3,245.40 2,017.89 H-5 HPM, 10,000 s.f. II-B, III-A, V-A 5,189.76 1,370.89 5,946.90 1,622.70 1,008.94 8,649.60 2,284.82 9,911.50 2,704.50 1,681.57 H-5 HPM, 10,000 s.f. III-B, IV, V-B 4,151.81 1,096.72 4,757.52 1,298.16 807.15 6,919.68 1,827.86 7,929.20 2,163.60 1,345.26H-5 HPM, 20,000 s.f. I-A, I-B, II-A 7,368.00 2,382.52 8,443.08 2,820.24 1,512.80 12,280.00 3,970.86 14,071.80 4,700.40 2,521.33 H-5 HPM, 20,000 s.f. II-B, III-A, V-A 6,140.00 1,985.43 7,035.90 2,350.20 1,260.67 10,233.34 3,309.05 11,726.50 3,917.00 2,101.11H-5 HPM, 20,000 s.f. III-B, IV, V-B 4,912.00 1,588.35 5,628.72 1,880.16 1,008.53 8,186.67 2,647.24 9,381.20 3,133.60 1,680.89 H-5 HPM, 50,000 s.f. I-A, I-B, II-A 9,210.00 2,836.33 10,553.76 3,357.72 1,865.15 15,350.00 4,727.22 17,589.60 5,596.20 3,108.58 H-5 HPM, 50,000 s.f. II-B, III-A, V-A 7,675.00 2,363.61 8,794.80 2,798.10 1,554.29 12,791.67 3,939.35 14,658.00 4,663.50 2,590.48H-5 HPM, 50,000 s.f. III-B, IV, V-B 6,140.00 1,890.89 7,035.84 2,238.48 1,243.43 10,233.34 3,151.48 11,726.40 3,730.80 2,072.38 Budget Fiscal Year 2026 Page 89 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
H-5 HPM, 100,000 s.f. I-A, I-B, II-A 13,069.43 3,687.23 14,976.36 4,365.00 2,584.70 21,782.39 6,145.39 24,960.60 7,275.00 4,307.83 H-5 HPM, 100,000 s.f. II-B, III-A, V-A 10,891.19 3,072.69 12,480.30 3,637.50 2,153.91 18,151.99 5,121.15 20,800.50 6,062.50 3,589.86 H-5 HPM, 100,000 s.f. III-B, IV, V-B 8,712.95 2,458.15 9,984.24 2,910.00 1,723.13 14,521.59 4,096.92 16,640.40 4,850.00 2,871.89 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. I-A, I-B, II-A 3,596.29 623.99 4,120.92 738.36 639.00 5,993.81 1,039.99 6,868.20 1,230.60 1,065.00 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. II-B, III-A, V-A 2,996.91 519.99 3,434.10 615.30 532.50 4,994.84 866.66 5,723.50 1,025.50 887.50 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. III-B, IV, V-B 2,397.52 416.00 2,747.28 492.24 426.00 3,995.87 693.33 4,578.80 820.40 710.00 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. I-A, I-B, II-A 5,789.14 1,247.99 6,633.72 1,477.08 1,073.67 9,648.57 2,079.98 11,056.20 2,461.80 1,789.45 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. II-B, III-A, V-A 4,824.29 1,039.99 5,528.10 1,230.90 894.72 8,040.48 1,733.31 9,213.50 2,051.50 1,491.21 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. III-B, IV, V-B 3,859.43 831.99 4,422.48 984.72 715.78 6,432.38 1,386.65 7,370.80 1,641.20 1,192.97 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. I-A, I-B, II-A 5,964.57 2,212.34 6,834.60 2,619.00 1,276.69 9,940.95 3,687.23 11,391.00 4,365.00 2,127.81 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. II-B, III-A, V-A 4,970.48 1,843.62 5,695.50 2,182.50 1,063.91 8,284.13 3,072.69 9,492.50 3,637.50 1,773.18 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. III-B, IV, V-B 3,976.38 1,474.89 4,556.40 1,746.00 851.13 6,627.30 2,458.15 7,594.00 2,910.00 1,418.54 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. I-A, I-B, II-A 7,104.86 3,119.97 8,141.40 3,693.24 1,609.82 11,841.43 5,199.94 13,569.00 6,155.40 2,683.03 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. II-B, III-A, V-A 5,920.72 2,599.97 6,784.50 3,077.70 1,341.51 9,867.86 4,333.28 11,307.50 5,129.50 2,235.86 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. III-B, IV, V-B 4,736.57 2,079.98 5,427.60 2,462.16 1,073.21 7,894.29 3,466.63 9,046.00 4,103.60 1,788.68 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. I-A, I-B, II-A 8,859.14 3,743.96 10,151.64 4,431.96 1,980.50 14,765.24 6,239.93 16,919.40 7,386.60 3,300.83 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. II-B, III-A, V-A 7,382.62 3,119.97 8,459.70 3,693.30 1,650.41 12,304.37 5,199.94 14,099.50 6,155.50 2,750.69 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. III-B, IV, V-B 5,906.10 2,495.97 6,767.76 2,954.64 1,320.33 9,843.49 4,159.95 11,279.60 4,924.40 2,200.55 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. I-A, I-B, II-A 12,630.86 4,821.76 14,473.80 5,708.16 2,729.34 21,051.43 8,036.27 24,123.00 9,513.60 4,548.89I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. II-B, III-A, V-A 10,525.72 4,018.14 12,061.50 4,756.80 2,274.45 17,542.86 6,696.89 20,102.50 7,928.00 3,790.74 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. III-B, IV, V-B 8,420.57 3,214.51 9,649.20 3,805.44 1,819.56 14,034.29 5,357.52 16,082.00 6,342.40 3,032.60I-4, I-2.1 Day Care/Outpatient 1,000 s.f. I-A, I-B, II-A 3,596.29 567.27 4,120.92 671.40 628.77 5,993.81 945.44 6,868.20 1,119.00 1,047.95 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. II-B, III-A, V-A 2,996.91 472.72 3,434.10 559.50 523.97 4,994.84 787.87 5,723.50 932.50 873.29 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. III-B, IV, V-B 2,397.52 378.18 2,747.28 447.60 419.18 3,995.87 630.30 4,578.80 746.00 698.63 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. I-A, I-B, II-A 5,701.43 1,191.26 6,533.28 1,410.12 1,050.71 9,502.38 1,985.43 10,888.80 2,350.20 1,751.18 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. II-B, III-A, V-A 4,751.19 992.72 5,444.40 1,175.10 875.59 7,918.65 1,654.53 9,074.00 1,958.50 1,459.32 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. III-B, IV, V-B 3,800.95 794.17 4,355.52 940.08 700.47 6,334.92 1,323.62 7,259.20 1,566.80 1,167.46 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. I-A, I-B, II-A 5,964.57 2,042.16 6,834.60 2,417.40 1,245.27 9,940.95 3,403.60 11,391.00 4,029.00 2,075.45I-4, I-2.1 Day Care/Outpatient 10,000 s.f. II-B, III-A, V-A 4,970.48 1,701.80 5,695.50 2,014.50 1,037.72 8,284.13 2,836.33 9,492.50 3,357.50 1,729.54 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. III-B, IV, V-B 3,976.38 1,361.44 4,556.40 1,611.60 830.18 6,627.30 2,269.07 7,594.00 2,686.00 1,383.63 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. I-A, I-B, II-A 7,104.86 2,949.79 8,141.40 3,492.00 1,578.76 11,841.43 4,916.31 13,569.00 5,820.00 2,631.26I-4, I-2.1 Day Care/Outpatient 20,000 s.f. II-B, III-A, V-A 5,920.72 2,458.15 6,784.50 2,910.00 1,315.63 9,867.86 4,096.92 11,307.50 4,850.00 2,192.72I-4, I-2.1 Day Care/Outpatient 20,000 s.f. III-B, IV, V-B 4,736.57 1,966.52 5,427.60 2,328.00 1,052.50 7,894.29 3,277.54 9,046.00 3,880.00 1,754.17 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. I-A, I-B, II-A 8,859.14 3,517.05 10,151.64 4,163.40 1,938.84 14,765.24 5,861.75 16,919.40 6,939.00 3,231.41 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. II-B, III-A, V-A 7,382.62 2,930.88 8,459.70 3,469.50 1,615.70 12,304.37 4,884.79 14,099.50 5,782.50 2,692.84 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. III-B, IV, V-B 5,906.10 2,344.70 6,767.76 2,775.60 1,292.56 9,843.49 3,907.84 11,279.60 4,626.00 2,154.27I-4, I-2.1 Day Care/Outpatient 100,000 s.f. I-A, I-B, II-A 12,630.86 4,254.50 14,473.80 5,036.40 2,624.84 21,051.43 7,090.83 24,123.00 8,394.00 4,374.74 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. II-B, III-A, V-A 10,525.72 3,545.41 12,061.50 4,197.00 2,187.37 17,542.86 5,909.02 20,102.50 6,995.00 3,645.61 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. III-B, IV, V-B 8,420.57 2,836.33 9,649.20 3,357.60 1,749.89 14,034.29 4,727.22 16,082.00 5,596.00 2,916.49 M Mercantile 1,000 s.f. I-A, I-B, II-A 2,456.00 964.35 2,814.12 1,141.56 535.33 4,093.33 1,607.25 4,690.20 1,902.60 892.21 M Mercantile 1,000 s.f. II-B, III-A, V-A 2,046.67 803.63 2,345.10 951.30 446.11 3,411.11 1,339.38 3,908.50 1,585.50 743.51M Mercantile 1,000 s.f. III-B, IV, V-B 1,637.33 642.90 1,876.08 761.04 356.88 2,728.89 1,071.50 3,126.80 1,268.40 594.81 M Mercantile 5,000 s.f. I-A, I-B, II-A 3,771.72 1,474.89 4,321.80 1,746.00 821.19 6,286.19 2,458.15 7,203.00 2,910.00 1,368.65 M Mercantile 5,000 s.f. II-B, III-A, V-A 3,143.10 1,229.08 3,601.50 1,455.00 684.33 5,238.49 2,048.46 6,002.50 2,425.00 1,140.54 M Mercantile 5,000 s.f. III-B, IV, V-B 2,514.48 983.26 2,881.20 1,164.00 547.46 4,190.79 1,638.77 4,802.00 1,940.00 912.44 M Mercantile 10,000 s.f. I-A, I-B, II-A 3,947.14 2,212.34 4,523.04 2,619.00 982.56 6,578.57 3,687.23 7,538.40 4,365.00 1,637.60 Budget Fiscal Year 2026 Page 90 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
M Mercantile 10,000 s.f. II-B, III-A, V-A 3, 1,843.62 289.29 3,769.20 2,182.50 818.80 5,482.14 3,072.69 6,282.00 3,637.50 1,364.66 M Mercantile 10,000 s.f. III-B, IV, V-B 2, 1,474.89 631.43 3,015.36 1,746.00 655.04 4,385.72 2,458.15 5,025.60 2,910.00 1,091.73 M Mercantile 20,000 s.f. I-A, I-B, II-A 4,648.86 3,346.87 5,326.92 3,962.16 1,293.35 7,748.10 5,578.12 8,878.20 6,603.60 2,155.58 M Mercantile 20,000 s.f. II-B, III-A, V-A 3, 2,789.06 874.05 4,439.10 3,301.80 1,077.79 6,456.75 4,648.43 7,398.50 5,503.00 1,796.32 M Mercantile 20,000 s.f. III-B, IV, V-B 3, 2,231.25 099.24 3,551.28 2,641.44 862.23 5,165.40 3,718.75 5,918.80 4,402.40 1,437.06 M Mercantile 50,000 s.f. I-A, I-B, II-A 5,789.14 4,311.22 6,633.72 5,103.72 1,637.07 9,648.57 7,185.37 11,056.20 8,506.20 2,728.45M Mercantile 50,000 s.f. II-B, III-A, V-A 4, 3,592.69 824.29 5,528.10 4,253.10 1,364.23 8,040.48 5,987.81 9,213.50 7,088.50 2,273.71 M Mercantile 50,000 s.f. III-B, IV, V-B 3, 2,874.15 859.43 4,422.48 3,402.48 1,091.38 6,432.38 4,790.25 7,370.80 5,670.80 1,818.97 M Mercantile 100,000 s.f. I-A, I-B, II-A 6,578.57 5,559.21 7,538.40 6,581.16 1,981.78 10,964.29 9,265.35 12,564.00 10,968.60 3,302.96 M Mercantile 100,000 s.f. II-B, III-A, V-A 5,482.14 4,632.68 6,282.00 5,484.30 1,651.48 9,136.91 7,721.13 10,470.00 9,140.50 2,752.47M Mercantile 100,000 s.f. III-B, IV, V-B 4,385.72 3,706.14 5,025.60 4,387.44 1,321.18 7,309.53 6,176.90 8,376.00 7,312.40 2,201.97 M Mercantile 200,000 s.f. I-A, I-B, II-A 7,368.00 7,317.74 8,443.08 8,663.04 2,420.38 12,280.00 12,196.23 14,071.80 14,438.40 4,033.97 M Mercantile 200,000 s.f. II-B, III-A, V-A 6,140.00 6,098.11 7,035.90 7,219.20 2,016.98 10,233.34 10,163.52 11,726.50 12,032.00 3,361.64 M Mercantile 200,000 s.f. III-B, IV, V-B 4,912.00 4,878.49 5,628.72 5,775.36 1,613.59 8,186.67 8,130.82 9,381.20 9,625.60 2,689.31 R-1 Apartments/Hotel Transient 1,000 s.f. I-A, I-B, II-A 3,070.00 1,077.81 3,517.92 1,275.84 645.95 5,116.67 1,796.34 5,863.20 2,126.40 1,076.59R-1 Apartments/Hotel Transient 1,000 s.f. II-B, III-A, V-A 2,558.33 898.17 2,931.60 1,063.20 538.29 4,263.89 1,496.95 4,886.00 1,772.00 897.16 R-1 Apartments/Hotel Transient 1,000 s.f. III-B, IV, V-B 2,046.67 718.54 2,345.28 850.56 430.64 3,411.11 1,197.56 3,908.80 1,417.60 717.73 R-1 Apartments/Hotel Transient 5,000 s.f. I-A, I-B, II-A 4,736.57 2,042.16 5,427.72 2,417.40 1,066.39 7,894.29 3,403.60 9,046.20 4,029.00 1,777.31R-1 Apartments/Hotel Transient 5,000 s.f. II-B, III-A, V-A 3,947.14 1,701.80 4,523.10 2,014.50 888.66 6,578.57 2,836.33 7,538.50 3,357.50 1,481.10 R-1 Apartments/Hotel Transient 5,000 s.f. III-B, IV, V-B 3,157.71 1,361.44 3,618.48 1,611.60 710.93 5,262.86 2,269.07 6,030.80 2,686.00 1,184.88 R-1 Apartments/Hotel Transient 10,000 s.f. I-A, I-B, II-A 4,912.00 3,403.60 5,628.60 4,029.12 1,342.12 8,186.67 5,672.66 9,381.00 6,715.20 2,236.87 R-1 Apartments/Hotel Transient 10,000 s.f. II-B, III-A, V-A 4,093.33 2,836.33 4,690.50 3,357.60 1,118.43 6,822.22 4,727.22 7,817.50 5,596.00 1,864.06 R-1 Apartments/Hotel Transient 10,000 s.f. III-B, IV, V-B 3,274.67 2,269.07 3,752.40 2,686.08 894.75 5,457.78 3,781.78 6,254.00 4,476.80 1,491.25 R-1 Apartments/Hotel Transient 20,000 s.f. I-A, I-B, II-A 5,789.14 4,765.04 6,633.72 5,640.84 1,720.38 9,648.57 7,941.73 11,056.20 9,401.40 2,867.30R-1 Apartments/Hotel Transient 20,000 s.f. II-B, III-A, V-A 4,824.29 3,970.86 5,528.10 4,700.70 1,433.65 8,040.48 6,618.11 9,213.50 7,834.50 2,389.41 R-1 Apartments/Hotel Transient 20,000 s.f. III-B, IV, V-B 3,859.43 3,176.69 4,422.48 3,760.56 1,146.92 6,432.38 5,294.49 7,370.80 6,267.60 1,911.53 R-1 Apartments/Hotel Transient 50,000 s.f. I-A, I-B, II-A 7,280.29 5,729.39 8,342.28 6,782.40 2,115.00 12,133.81 9,548.98 13,903.80 11,304.00 3,525.00 R-1 Apartments/Hotel Transient 50,000 s.f. II-B, III-A, V-A 6,066.91 4,774.49 6,951.90 5,652.00 1,762.50 10,111.51 7,957.49 11,586.50 9,420.00 2,937.50R-1 Apartments/Hotel Transient 50,000 s.f. III-B, IV, V-B 4,853.52 3,819.59 5,561.52 4,521.60 1,410.00 8,089.21 6,365.99 9,269.20 7,536.00 2,350.00 R-1 Apartments/Hotel Transient 100,000 s.f. I-A, I-B, II-A 10,262.57 7,374.46 11,759.76 8,730.00 2,852.72 17,104.29 12,290.77 19,599.60 14,550.00 4,754.54 R-1 Apartments/Hotel Transient 100,000 s.f. II-B, III-A, V-A 8,552.14 6,145.39 9,799.80 7,275.00 2,377.27 14,253.57 10,242.31 16,333.00 12,125.00 3,962.12R-1 Apartments/Hotel Transient 100,000 s.f. III-B, IV, V-B 6,841.72 4,916.31 7,839.84 5,820.00 1,901.82 11,402.86 8,193.85 13,066.40 9,700.00 3,169.69 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. I-A, I-B, II-A 3,070.00 1,021.08 3,517.92 1,208.52 635.36 5,116.67 1,701.80 5,863.20 2,014.20 1,058.93 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. II-B, III-A, V-A 2,558.33 850.90 2,931.60 1,007.10 529.47 4,263.89 1,418.17 4,886.00 1,678.50 882.44 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. III-B, IV, V-B 2,046.67 680.72 2,345.28 805.68 423.57 3,411.11 1,134.53 3,908.80 1,342.80 705.96 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. I-A, I-B, II-A 4,385.72 1,928.71 5,025.60 2,283.12 994.30 7,309.53 3,214.51 8,376.00 3,805.20 1,657.17 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. II-B, III-A, V-A 3,654.76 1,607.25 4,188.00 1,902.60 828.58 6,091.27 2,678.76 6,980.00 3,171.00 1,380.97 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. III-B, IV, V-B 2,923.81 1,285.80 3,350.40 1,522.08 662.87 4,873.02 2,143.01 5,584.00 2,536.80 1,104.78 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. I-A, I-B, II-A 4,473.43 3,403.60 5,126.04 4,029.12 1,278.13 7,455.72 5,672.66 8,543.40 6,715.20 2,130.22R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. II-B, III-A, V-A 3,727.86 2,836.33 4,271.70 3,357.60 1,065.11 6,213.10 4,727.22 7,119.50 5,596.00 1,775.18R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. III-B, IV, V-B 2,982.29 2,269.07 3,417.36 2,686.08 852.09 4,970.48 3,781.78 5,695.60 4,476.80 1,420.15 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. I-A, I-B, II-A 5,262.86 4,141.04 6,030.72 4,902.12 1,528.94 8,771.43 6,901.74 10,051.20 8,170.20 2,548.23 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. II-B, III-A, V-A 4,385.72 3,450.87 5,025.60 4,085.10 1,274.11 7,309.53 5,751.45 8,376.00 6,808.50 2,123.52R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. III-B, IV, V-B 3,508.57 2,760.70 4,020.48 3,268.08 1,019.29 5,847.62 4,601.16 6,700.80 5,446.80 1,698.82 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. I-A, I-B, II-A 6,490.86 5,048.67 7,437.96 5,976.72 1,875.15 10,818.10 8,414.45 12,396.60 9,961.20 3,125.25 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. II-B, III-A, V-A 5,409.05 4,207.23 6,198.30 4,980.60 1,562.63 9,015.08 7,012.04 10,330.50 8,301.00 2,604.38 Budget Fiscal Year 2026 Page 91 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. III-B, IV, V-B 4, 3,365.78 327.24 4,958.64 3,984.48 1,250.10 7,212.06 5,609.63 8,264.40 6,640.80 2,083.50 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. I-A, I-B, II-A 8,859.14 6,353.38 10,151.64 7,521.12 2,460.23 14,765.24 10,588.97 16,919.40 12,535.20 4,100.39R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. II-B, III-A, V-A 7, 5,294.49 382.62 8,459.70 6,267.60 2,050.19 12,304.37 8,824.14 14,099.50 10,446.00 3,416.99R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. III-B, IV, V-B 5, 4,235.59 906.10 6,767.76 5,014.08 1,640.15 9,843.49 7,059.32 11,279.60 8,356.80 2,733.59R-2.1 Residential Care/Assist Living Facility 1,000 s.f. I-A, I-B, II-A 3,684.00 1,418.17 4,221.36 1,678.68 797.87 6,140.00 2,363.61 7,035.60 2,797.80 1,329.79 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. II-B, III-A, V-A 3, 1,181.80 070.00 3,517.80 1,398.90 664.89 5,116.67 1,969.67 5,863.00 2,331.50 1,108.16 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. III-B, IV, V-B 2, 945.44 456.00 2,814.24 1,119.12 531.92 4,093.33 1,575.74 4,690.40 1,865.20 886.53 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. I-A, I-B, II-A 5,262.86 1,815.25 6,030.72 2,148.84 1,101.45 8,771.43 3,025.42 10,051.20 3,581.40 1,835.75R-2.1 Residential Care/Assist Living Facility 5,000 s.f. II-B, III-A, V-A 4,385.72 1,512.71 5,025.60 1,790.70 917.87 7,309.53 2,521.18 8,376.00 2,984.50 1,529.79 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. III-B, IV, V-B 3,508.57 1,210.17 4,020.48 1,432.56 734.30 5,847.62 2,016.95 6,700.80 2,387.60 1,223.83 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. I-A, I-B, II-A 5,438.29 2,382.52 6,231.60 2,820.24 1,231.03 9,063.81 3,970.86 10,386.00 4,700.40 2,051.72 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. II-B, III-A, V-A 4,531.91 1,985.43 5,193.00 2,350.20 1,025.86 7,553.18 3,309.05 8,655.00 3,917.00 1,709.77 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. III-B, IV, V-B 3,625.52 1,588.35 4,154.40 1,880.16 820.69 6,042.54 2,647.24 6,924.00 3,133.60 1,367.82 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. I-A, I-B, II-A 6,490.86 3,063.24 7,437.96 3,626.28 1,510.14 10,818.10 5,105.40 12,396.60 6,043.80 2,516.91 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. II-B, III-A, V-A 5,409.05 2,552.70 6,198.30 3,021.90 1,258.45 9,015.08 4,254.50 10,330.50 5,036.50 2,097.42 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. III-B, IV, V-B 4,327.24 2,042.16 4,958.64 2,417.52 1,006.76 7,212.06 3,403.60 8,264.40 4,029.20 1,677.94 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. I-A, I-B, II-A 7,894.29 4,027.59 9,046.08 4,767.84 1,892.04 13,157.15 6,712.65 15,076.80 7,946.40 3,153.40 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. II-B, III-A, V-A 6,578.57 3,356.33 7,538.40 3,973.20 1,576.70 10,964.29 5,593.88 12,564.00 6,622.00 2,627.84 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. III-B, IV, V-B 5,262.86 2,685.06 6,030.72 3,178.56 1,261.36 8,771.43 4,475.10 10,051.20 5,297.60 2,102.27R-2.1 Residential Care/Assist Living Facility 100,000 s.f. I-A, I-B, II-A 10,788.86 5,218.85 12,363.12 6,178.32 2,533.73 17,981.43 8,698.08 20,605.20 10,297.20 4,222.88 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. II-B, III-A, V-A 8,990.72 4,349.04 10,302.60 5,148.60 2,111.44 14,984.53 7,248.40 17,171.00 8,581.00 3,519.07R-2.1 Residential Care/Assist Living Facility 100,000 s.f. III-B, IV, V-B 7,192.57 3,479.23 8,242.08 4,118.88 1,689.15 11,987.62 5,798.72 13,736.80 6,864.80 2,815.26R-3 Single Family Residential 2,000 s.f. I-A, I-B, II-A 1,228.00 397.09 1,406.88 469.80 251.59 2,046.67 661.81 2,344.80 783.00 419.32 R-3 Single Family Residential 2,000 s.f. II-B, III-A, V-A 1,023.33 330.91 1,172.40 391.50 209.66 1,705.56 551.51 1,954.00 652.50 349.44 R-3 Single Family Residential 2,000 s.f. III-B, IV, V-B 818.67 264.72 937.92 313.20 167.73 1,364.44 441.21 1,563.20 522.00 279.55 R-3 Single Family Residential 3,000 s.f. I-A, I-B, II-A 1,578.86 453.81 1,809.00 537.12 313.45 2,631.43 756.36 3,015.00 895.20 522.42 R-3 Single Family Residential 3,000 s.f. II-B, III-A, V-A 1,315.71 378.18 1,507.50 447.60 261.21 2,192.86 630.30 2,512.50 746.00 435.35 R-3 Single Family Residential 3,000 s.f. III-B, IV, V-B 1,052.57 302.54 1,206.00 358.08 208.97 1,754.29 504.24 2,010.00 596.80 348.28 R-3 Single Family Residential 5,000 s.f. I-A, I-B, II-A 2,280.57 623.99 2,613.24 738.36 447.04 3,800.95 1,039.99 4,355.40 1,230.60 745.06 R-3 Single Family Residential 5,000 s.f. II-B, III-A, V-A 1,900.48 519.99 2,177.70 615.30 372.53 3,167.46 866.66 3,629.50 1,025.50 620.88 R-3 Single Family Residential 5,000 s.f. III-B, IV, V-B 1,520.38 416.00 1,742.16 492.24 298.02 2,533.97 693.33 2,903.60 820.40 496.71 R-3 Single Family Residential 10,000 s.f. I-A, I-B, II-A 2,543.71 850.90 2,914.56 1,007.28 527.23 4,239.52 1,418.17 4,857.60 1,678.80 878.71R-3 Single Family Residential 10,000 s.f. II-B, III-A, V-A 2,119.76 709.08 2,428.80 839.40 439.35 3,532.94 1,181.80 4,048.00 1,399.00 732.26 R-3 Single Family Residential 10,000 s.f. III-B, IV, V-B 1,695.81 567.27 1,943.04 671.52 351.48 2,826.35 945.44 3,238.40 1,119.20 585.81 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. I-A, I-B, II-A 3,684.00 794.17 4,221.36 939.96 683.15 6,140.00 1,323.62 7,035.60 1,566.60 1,138.58 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. II-B, III-A, V-A 3,070.00 661.81 3,517.80 783.30 569.29 5,116.67 1,103.02 5,863.00 1,305.50 948.81 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. III-B, IV, V-B 2,456.00 529.45 2,814.24 626.64 455.43 4,093.33 882.41 4,690.40 1,044.40 759.05 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. I-A, I-B, II-A 5,262.86 1,247.99 6,030.72 1,477.08 996.96 8,771.43 2,079.98 10,051.20 2,461.80 1,661.59 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. II-B, III-A, V-A 4,385.72 1,039.99 5,025.60 1,230.90 830.80 7,309.53 1,733.31 8,376.00 2,051.50 1,384.66 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. III-B, IV, V-B 3,508.57 831.99 4,020.48 984.72 664.64 5,847.62 1,386.65 6,700.80 1,641.20 1,107.73 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. I-A, I-B, II-A 5,438.29 1,701.80 6,231.60 2,014.56 1,106.07 9,063.81 2,836.33 10,386.00 3,357.60 1,843.46 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. II-B, III-A, V-A 4,531.91 1,418.17 5,193.00 1,678.80 921.73 7,553.18 2,363.61 8,655.00 2,798.00 1,536.21 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. III-B, IV, V-B 3,625.52 1,134.53 4,154.40 1,343.04 737.38 6,042.54 1,890.89 6,924.00 2,238.40 1,228.97 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. I-A, I-B, II-A 6,490.86 2,382.52 7,437.96 2,820.24 1,384.82 10,818.10 3,970.86 12,396.60 4,700.40 2,308.04 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. II-B, III-A, V-A 5,409.05 1,985.43 6,198.30 2,350.20 1,154.02 9,015.08 3,309.05 10,330.50 3,917.00 1,923.36 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. III-B, IV, V-B 4,327.24 1,588.35 4,958.64 1,880.16 923.22 7,212.06 2,647.24 8,264.40 3,133.60 1,538.69 Budget Fiscal Year 2026 Page 92 of 103 Draft - Updated as of 8/3/26
BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. I-A, I-B, II-A 7,894.29 2,836.33 9,046.08 3,357.72 1,673.18 13,157.15 4,727.22 15,076.80 5,596.20 2,788.63 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. II-B, III-A, V-A 6,578.57 2,363.61 7,538.40 2,798.10 1,394.32 10,964.29 3,939.35 12,564.00 4,663.50 2,323.86 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. III-B, IV, V-B 5,262.86 1,890.89 6,030.72 2,238.48 1,115.45 8,771.43 3,151.48 10,051.20 3,730.80 1,859.09 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. I-A, I-B, II-A 10,788.86 3,687.23 12,363.12 4,365.00 2,252.03 17,981.43 6,145.39 20,605.20 7,275.00 3,753.38 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. II-B, III-A, V-A 8,990.72 3,072.69 10,302.60 3,637.50 1,876.69 14,984.53 5,121.15 17,171.00 6,062.50 3,127.82 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. III-B, IV, V-B 7,192.57 2,458.15 8,242.08 2,910.00 1,501.35 11,987.62 4,096.92 13,736.80 4,850.00 2,502.25 R-4 Residential Care/Assisted Living Facility 1,000 s.f. I-A, I-B, II-A 3,684.00 567.27 4,221.36 671.40 641.49 6,140.00 945.44 7,035.60 1,119.00 1,069.15 R-4 Residential Care/Assisted Living Facility 1,000 s.f. II-B, III-A, V-A 3,070.00 472.72 3,517.80 559.50 534.58 5,116.67 787.87 5,863.00 932.50 890.96 R-4 Residential Care/Assisted Living Facility 1,000 s.f. III-B, IV, V-B 2,456.00 378.18 2,814.24 447.60 427.66 4,093.33 630.30 4,690.40 746.00 712.77 R-4 Residential Care/Assisted Living Facility 5,000 s.f. I-A, I-B, II-A 5,262.86 1,021.08 6,030.72 1,208.52 955.30 8,771.43 1,701.80 10,051.20 2,014.20 1,592.17 R-4 Residential Care/Assisted Living Facility 5,000 s.f. II-B, III-A, V-A 4,385.72 850.90 5,025.60 1,007.10 796.09 7,309.53 1,418.17 8,376.00 1,678.50 1,326.81 R-4 Residential Care/Assisted Living Facility 5,000 s.f. III-B, IV, V-B 3,508.57 680.72 4,020.48 805.68 636.87 5,847.62 1,134.53 6,700.80 1,342.80 1,061.45 R-4 Residential Care/Assisted Living Facility 10,000 s.f. I-A, I-B, II-A 5,438.29 1,701.80 6,231.60 2,014.56 1,106.07 9,063.81 2,836.33 10,386.00 3,357.60 1,843.46 R-4 Residential Care/Assisted Living Facility 10,000 s.f. II-B, III-A, V-A 4,531.91 1,418.17 5,193.00 1,678.80 921.73 7,553.18 2,363.61 8,655.00 2,798.00 1,536.21 R-4 Residential Care/Assisted Living Facility 10,000 s.f. III-B, IV, V-B 3,625.52 1,134.53 4,154.40 1,343.04 737.38 6,042.54 1,890.89 6,924.00 2,238.40 1,228.97 R-4 Residential Care/Assisted Living Facility 20,000 s.f. I-A, I-B, II-A 6,490.86 2,212.34 7,437.96 2,619.00 1,353.76 10,818.10 3,687.23 12,396.60 4,365.00 2,256.27 R-4 Residential Care/Assisted Living Facility 20,000 s.f. II-B, III-A, V-A 5,409.05 1,843.62 6,198.30 2,182.50 1,128.14 9,015.08 3,072.69 10,330.50 3,637.50 1,880.23 R-4 Residential Care/Assisted Living Facility 20,000 s.f. III-B, IV, V-B 4,327.24 1,474.89 4,958.64 1,746.00 902.51 7,212.06 2,458.15 8,264.40 2,910.00 1,504.18 R-4 Residential Care/Assisted Living Facility 50,000 s.f. I-A, I-B, II-A 7,894.29 2,666.15 9,046.08 3,156.12 1,641.76 13,157.15 4,443.59 15,076.80 5,260.20 2,736.27 R-4 Residential Care/Assisted Living Facility 50,000 s.f. II-B, III-A, V-A 6,578.57 2,221.79 7,538.40 2,630.10 1,368.13 10,964.29 3,702.99 12,564.00 4,383.50 2,280.22 R-4 Residential Care/Assisted Living Facility 50,000 s.f. III-B, IV, V-B 5,262.86 1,777.43 6,030.72 2,104.08 1,094.51 8,771.43 2,962.39 10,051.20 3,506.80 1,824.18R-4 Residential Care/Assisted Living Facility 100,000 s.f. I-A, I-B, II-A 10,788.86 3,403.60 12,363.12 4,029.12 2,199.78 17,981.43 5,672.66 20,605.20 6,715.20 3,666.30 R-4 Residential Care/Assisted Living Facility 100,000 s.f. II-B, III-A, V-A 8,990.72 2,836.33 10,302.60 3,357.60 1,833.15 14,984.53 4,727.22 17,171.00 5,596.00 3,055.25 R-4 Residential Care/Assisted Living Facility 100,000 s.f. III-B, IV, V-B 7,192.57 2,269.07 8,242.08 2,686.08 1,466.52 11,987.62 3,781.78 13,736.80 4,476.80 2,444.20 U Detached Access. Structure 2,000 s.f. I-A, I-B, II-A 1,403.43 737.45 1,608.12 873.00 340.24 2,339.05 1,229.08 2,680.20 1,455.00 567.07 U Detached Access. Structure 2,000 s.f. II-B, III-A, V-A 1,169.52 614.54 1,340.10 727.50 283.54 1,949.21 1,024.23 2,233.50 1,212.50 472.56 U Detached Access. Structure 2,000 s.f. III-B, IV, V-B 935.62 491.63 1,072.08 582.00 226.83 1,559.37 819.38 1,786.80 970.00 378.05 U Detached Access. Structure 3,000 s.f. I-A, I-B, II-A 1,754.29 794.17 2,010.24 939.96 401.74 2,923.81 1,323.62 3,350.40 1,566.60 669.57 U Detached Access. Structure 3,000 s.f. II-B, III-A, V-A 1,461.91 661.81 1,675.20 783.30 334.78 2,436.51 1,103.02 2,792.00 1,305.50 557.97 U Detached Access. Structure 3,000 s.f. III-B, IV, V-B 1,169.52 529.45 1,340.16 626.64 267.83 1,949.21 882.41 2,233.60 1,044.40 446.38 U Detached Access. Structure 5,000 s.f. I-A, I-B, II-A 2,543.71 1,191.26 2,914.56 1,410.12 589.71 4,239.52 1,985.43 4,857.60 2,350.20 982.84 U Detached Access. Structure 5,000 s.f. II-B, III-A, V-A 2,119.76 992.72 2,428.80 1,175.10 491.42 3,532.94 1,654.53 4,048.00 1,958.50 819.04 U Detached Access. Structure 5,000 s.f. III-B, IV, V-B 1,695.81 794.17 1,943.04 940.08 393.14 2,826.35 1,323.62 3,238.40 1,566.80 655.23 U Detached Access. Structure 10,000 s.f. I-A, I-B, II-A 2,806.86 1,588.35 3,216.24 1,880.28 701.32 4,678.10 2,647.24 5,360.40 3,133.80 1,168.86 U Detached Access. Structure 10,000 s.f. II-B, III-A, V-A 2,339.05 1,323.62 2,680.20 1,566.90 584.43 3,898.41 2,206.04 4,467.00 2,611.50 974.05 U Detached Access. Structure 10,000 s.f. III-B, IV, V-B 1,871.24 1,058.90 2,144.16 1,253.52 467.54 3,118.73 1,764.83 3,573.60 2,089.20 779.24 Footnotes:1. 30% is for non-structural review as determined by the Building Official.2. 50% is for structural review as determined by the Building Official.3. Minor rounding differences may occur as the actual permits are based on a percentage of Table A.4. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged at the hourly plan review rate.5. Where plans are incomplete or changed so as to require additional plan checks, an additional plan check fee shall be charged at the rate established by the fee schedule and minimum hours as determined by the Building Official.
Budget Fiscal Year 2026 Page 93 of 103 Draft - Updated as of 8/3/26
Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recommended
Fee
Dollar
Change
Recovery
Level
ADMINISTRATIVE PENALTIES
5 Administrative Penalties Schedule See Schedule See Schedule - 0 - 100%
LEGAL AND RISK MANAGEMENT
- Cost Recovery Payment Schedule for Damage to City See Schedule See Schedule - 0 - 100% Personal Property
POLICE DEPARTMENT
5 Parking Violation Penalty Schedule See Schedule See Schedule - 0 - 100%5 Administrative Penalties Schedule See Schedule See Schedule - 0 - 100% (moved from Police
Department section)
Removed Fees/description in RedUpdated Fees/description in BlueNew Fees in GreenTransferred Fees in Purple
CITY OF CORONA
MASTER FEE RECOVERY SCHEDULE
OTHER FEES
Budget Fiscal Year 2026 Page 94 of 103 Draft - Updated as of 8/3/26
.1 s
Budget Fiscal Year 2026
Page of 103 Draft - Updated as of 8/3/26
(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Fire Hydrants
The cost recovery payment amount for damage to a fire hydrant is based on recent historical average labor, material and vehicle costs to respond and repair or replace the fire hydrant using City personnel. If applicable, the billed amount shall also include the actual cost of water loss for each incident, as well as any third party equipment rental or other incurred costs.
Standard Costs Replacement Repair
City Labor Cost $1,229.37 $1,110.89
Material Cost $2,255.75 $262.11
Vehicle Cost $52.20 $93.48
$3,537.32 $1,466.48
Add:
Water Loss Actual Actual
Equipment Rental/Other Actual Actual
If the City contracts with a third party vendor to provide any portion of the services or materials covered by the above payment amount, the City shall not charge such duplicate portion(s) of the payment amount and shall only pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.
Budget Fiscal Year 2026 Page 96 of 103 Draft - Updated as of 8/3/26
(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Street or Other Traffic Signs
The cost recovery payment amount for damage to a basic City street sign or other basic traffic sign is based on recent historical average labor, material and vehicle costs to respond and repair or replace the sign using City personnel. If applicable, the billed amount shall also include any third party equipment rental or other incurred costs.
Standard Costs Replacement/Repair
City Labor Cost $399.98
Material Cost $157.35
Vehicle Cost $13.40
$570.73
Add:
Equipment Rental/Other Actual
If the City contracts with a third party vendor to provide any portion of the services or materials covered by the above payment amount, the City shall not charge such duplicate portion(s) of the payment amount and shall only pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.
If a sign is not a basic type, as determined by the Director of Public Works, the City may pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.
Budget Fiscal Year 2026 Page 97 of 103 Draft - Updated as of 8/3/26
(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Light Poles
The cost recovery payment amount for damage to a standard City light pole is based on recent historical average labor, material and equipment/vehicle costs to respond and repair or replace the light pole using City personnel, sometimes with supplemental support from a third party contractor. If applicable, the billed amount shall also include any third party contractors, equipment rental or other incurred costs.
Replace Replace Light and/or
Standard Costs Pole Electrical Cabinet Repair
City Labor Cost $2,227.51 $1,013.90 $474.61
Material Cost $3,586.03 $2,243.28 $0.00
Equipment/Vehicle Cost $204.16 $38.01 $12.37
$6,017.70 $3,295.19 $486.98
Add:
Contractor (Supplemental) Actual Actual Actual
Equipment Rental/Other Actual Actual Actual
If the City contracts with a third party vendor to provide any portion of the services or materials covered by the above payment amount, the City shall not charge such duplicate portion(s) of the payment amount and shall only pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.
If a light pole is not a standard type, as determined by the General Manager or Director of Public Works, the City may pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.
Budget Fiscal Year 2026 Page 98 of 103 Draft - Updated as of 8/3/26
(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Vehicles
The cost recovery payment amount for damage to a City vehicle varies based upon the type of vehicle and is based on a reasonable estimated amount of time for City personnel to respond and coordinate the vehicle repairs. The billed amount shall also include any third party towing fees and repair costs, and may include other incurred costs. Although not typically the case, if the repairs are performed by City personnel, the total actual cost for such labor will be included as well.
City Response/
Standard Costs Coordination Labor Cost
Police Vehicle $289.34
Fire Engine $320.99
Utility Truck $226.10
Other City Vehicle $226.10
Add:
Towing Actual
Repair (Parts & Labor) Actual
Other Actual
Budget Fiscal Year 2026 Page 99 of 103 Draft - Updated as of 8/3/26
(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Trees
The cost recovery payment amount for damage to a City tree is based on a reasonable estimated amount of time for City personnel to respond and coordinate the tree removal and replacement. The billed amount shall also include any third party removal and replacement costs, material costs (tree, mulch etc.) and may include other incurred costs. Although not typically the case, if the removal and replacement work is performed by City personnel, the total actual cost for such labor will be included as well.
City Response/
Standard Costs Coordination
City Labor Cost $544.51
Vehicle Cost $14.10
$558.61
Add:
Tree Removal/Replacement Actual
Materials Actual
Other Actual
Budget Fiscal Year 2026 Page 100 of 103 Draft - Updated as of 8/3/26
(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
2. Other City Property - Cost Recovery Payment Amounts.
For damage to all other City property not otherwise set forth in this schedule, including, without limitation, park lights, traffic signals and electric poles, the City shall have the authority to pursue and collect the total actual costs incurred by the City related to any incident involving such damages.
3. Annual Increases.
As provided for in Section 4 of the Resolution, the amounts included in this Cost Recovery Payment Schedule shall increase on July 1 of each year (beginning in 2017) by the greater of: (1) four percent (4%); or (2) the annual percentage increase in the Consumer Price Index, all Urban Consumers, for the Los Angeles-Orange-Riverside County Area, as determined by the United States Department of Labor Statistics, or its successor, measured using the most recent March to March data.
Budget Fiscal Year 2026 Page 101 of 103 Draft - Updated as of 8/3/26
Violation Penalty Notice 1st Penalty
CMC 10.20.020 No Vehicles Standing w/in any Parkways $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040 No Parking $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040(f) Traffic Hazard $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040(h) Parked w/in 20' of Crosswalk $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040(i) Parked w/in 20' of Stop Sign $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.050 Parked Over 72 Hours $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.150 Alley Parking $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.160 Designated Fire Lane $85.00 + 22 days N + 15 days + $25.00 CMC 10.20.200 Vehicle for Sale $90.00 + 22 days N + 15 days + $25.00 CMC 10.20.210 No Parking (Private Property Posted) $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.220 Obstructing Traffic $75.00 + 22 days N + 15 days + $25.00 CMC 10.20.240 Unlawful w/in Public Park $100.00 + 22 days N + 15 days + $25.00 CMC 10.20.250(a) Oversized Vehicle Parking $205.00 + 22 days N + 15 days + $25.00 CMC 10.20.250(b) Non Motorized Vehicle Parking $75.00 + 22 days N + 15 days + $25.00 CMC 10.20.260(a) Parked in Front Yard $75.00 + 22 days N + 15 days + $25.00 CMC 10.22.070 Permit Parking Only $45.00 + 22 days N + 15 days + $25.00 CMC 10.24.010 Green Curb Parking (Time Restricted) $45.00 + 22 days N + 15 days + $25.00 CMC 10.24.060 No Stopping $45.00 + 22 days N + 15 days + $25.00 CMC 10.24.080 Commercial Vehicle Prohibition $200.00 + 22 days N + 15 days + $25.00 CMC 10.24.090 Parked Along Painted Curb $45.00 + 22 days N + 15 days + $25.00 CMC 10.26.020 Restricted Parking $50.00 + 22 days N + 15 days + $25.00 CMC 10.26.020(d) Street Sweeping $55.00 + 22 days N + 15 days + $25.00 CMC 10.28.050 Handicapped Parking $350.00 + 22 days N + 15 days + $25.00 VC 21211(a) Blocking Bike Path $60.00 + 22 days N + 15 days + $25.00 VC 22500(a) Parking w/in an Intersection $45.00 + 22 days N + 15 days + $25.00 VC 22500(b) Parking on Crosswalk $45.00 + 22 days N + 15 days + $25.00 VC 22500(c) Parking Between Safety Zone $45.00 + 22 days N + 15 days + $25.00 VC 22500(d) Parked w/in 15' of Fire Station Driveway $45.00 + 22 days N + 15 days + $25.00 VC 22500(e) Blocking Driveway $45.00 + 22 days N + 15 days + $25.00 VC 22500(f) Parked on Sidewalk $45.00 + 22 days N + 15 days + $25.00 VC 22500(g) Parked on Highway Excavation $45.00 + 22 days N + 15 days + $25.00 VC 22500(h) Double Parking $45.00 + 22 days N + 15 days + $25.00 VC 22500(i) Parked at Bus Stop $150.00 + 22 days N + 15 days + $25.00 VC 22500(j) Parked in Tunnel $45.00 + 22 days N + 15 days + $25.00 VC 22500(k) Parked on Bridge $45.00 + 22 days N + 15 days + $25.00 VC 22500(l) Blocking Wheel Chair Ramp $350.00 + 22 days N + 15 days + $25.00 VC 22502(a) Parked 18" from Curb $45.00 + 22 days N + 15 days + $25.00 VC 22502(a) Parked Wrong Direction $45.00 + 22 days N + 15 days + $25.00 VC 22514 Parked w/in 15' from Fire Hydrant $60.00 + 22 days N + 15 days + $25.00 VC 4000(a)(1) No Registration $105.00 + 22 days N + 15 days + $25.00 VC 4463(a)(1) False Tabs $105.00 + 22 days N + 15 days + $25.00 VC 5200(a) Display of License Plates $90.00 + 22 days N + 15 days + $25.00 VC 5200(a) No Front License Plate $90.00 + 22 days N + 15 days + $25.00 VC 5204 Display of Tabs $90.00 + 22 days N + 15 days + $25.00 VC 22500(N) - W/in 20FT of veh approach of crosswalk $50.00 + 22 days N + 15 days + $25.00
EXHIBIT A
Corona Police Department
Parking Violation Penalty Schedule
Budget Fiscal Year 2026 Page 102 of 103 Draft - Updated as of 8/3/26
Taxes and Regulatory Fees Under Prop. 26
3URSDGGVDQHZGHILQLWLRQRI³WD[´LQWRWKH&DOLIRUQLD&RQVWLWXWLRQSURYLGLQJWKDWDQ\JRYHUQPHQW LPSRVHGFKDUJHOHY\RUH[DFWLRQRIDQ\NLQGLVDWD[XQOHVVLWIDOOVLQWRRQHRIDVHYHQH[SUHVV H[HPSWLRQV
Local Government Taxes under Prop. 26.7KHPHDVXUHDGGVWKHIROORZLQJODQJXDJH LGHQWLILHGE\
LWDOLFV
WR$UWLFOH;,,,&RIWKH&DOLIRUQLD&RQVWLWXWLRQ
DSRUWLRQRI3URSJRYHUQLQJWD[HV
SECTION 1 (e) As used in this article, “tax” means any levy, charge or exaction of any kind imposed by a local government, except the following:
(1) A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.
Specific Benefit Exemption. ([DPSOHV
SODQQLQJSHUPLWVSROLFHSHUPLWVVWUHHWFORVXUH
SHUPLWVSDUNLQJSHUPLWVLQUHVWULFWHG]RQHVVRPHIUDQFKLVHV²WRWKHH[WHQWWKHSULYLOHJHLV QRWSURYLGHGWRWKRVHQRWFKDUJHGDQGWKHIHHGRHVQRWH[FHHGWKHORFDOJRYHUQPHQW¶V UHDVRQDEOHFRVWVRIVHUYLFHWRWKHIHHSD\HU
(2) A charge imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product.
Specific Government Service or Product Exemption. ([DPSOHV XVHUIHHVLQFOXGLQJIRU
XWLOLWLHV
PRVWUHWDLOZDWHUVHZHUWUDVKDQGVWRUPZDWHUIHHVDUHH[HPSWXQGHUH[HPSWLRQ GLVFXVVHGEHORZ
SXEOLFUHFRUGVFRS\LQJIHHV'8,HPHUJHQF\UHVSRQVHIHHVHPHUJHQF\ PHGLFDODQGDPEXODQFHWUDQVSRUWVHUYLFHIHHVUHFUHDWLRQFODVVHVZHHGDEDWHPHQWWRWKH H[WHQWWKDWWKHVHUYLFHRUSURGXFWSULYLOHJHLVQRWSURYLGHGWRWKRVHQRWFKDUJHGDQGWKHIHH GRHVQRWH[FHHGWKHUHDVRQDEOHFRVWVRIVHUYLFHWRWKHORFDOJRYHUQPHQW (3) A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.
Permits and Inspections Exemption. ([DPSOHV
SHUPLWVIRUUHJXODWHGFRPPHUFLDODFWLYLWLHV
HJGDQFHKDOOELQJRFDUGURRPFKHFNFDVKLQJWD[LFDESHGGOHUVFDWHULQJWUXFNV PDVVDJHSDUORUILUHDUPGHDOHUVHWF
ILUHKHDOWKHQYLURQPHQWDOVDIHW\SHUPLWV
SROLFH
EDFNJURXQGFKHFNV
SHWOLFHQVHV
ELF\FOHOLFHQVHV
ZKHUHWKHFRVWVGRQRWH[FHHGWKH
UHDVRQDEOHUHJXODWRU\FRVWVWRWKHORFDOJRYHUQPHQWIRULVVXLQJWKHOLFHQVHRUSHUPLW
(4) A charge imposed for entrance to or use of local government property or the purchase rental or lease of local government property.
Local Government Property Exemption. ([DPSOHV
IDFLOLW\UHQWDOIHHVURRPUHQWDOIHHV
HTXLSPHQWUHQWDOIHHVRQDQGRIIVWUHHWSDUNLQJWROOVIUDQFKLVHSDUNHQWUDQFHPXVHXP DGPLVVLRQ]RRDGPLVVLRQWLSSLQJIHHVJROIJUHHQIHHVHWF (5) A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government as a result of a violation of law, including late payment fees, fees imposed under administrative citation ordinances, parking violations, etc.
Penalty for Illegal Activity Exemption. ([DPSOHV
SDUNLQJILQHVFRGHHQIRUFHPHQWIHHV
DQGSHQDOWLHVODWHSD\PHQWIHHVLQWHUHVWFKDUJHVDQGRWKHUFKDUJHVIRUYLRODWLRQRIWKHODZ (6) A charge imposed as a condition of property development.
Property Development Exemption. ([DPSOHV
SODQQLQJ&(4$DQGEXLOGLQJSHUPLWIHHV
FRQVWUXFWLRQSHUPLWVGHYHORSPHQWLPSDFWIHHVIHHVLPSRVHGWRUHPHG\WKHHIIHFWVRIWKHIHH SD\RU¶VRSHUDWLRQWKDWDUHLPSRVHGDVDFRQGLWLRQRISURSHUW\GHYHORSPHQW LQFOXGLQJ&(4$
PLWLJDWLRQPHDVXUHVUHTXLULQJWKHSD\PHQWRIPRQH\
(7) Assessments and property related fees imposed in accordance with the provisions of Article XIII D.
3URSRVLWLRQ
Prop. 218 Exemption.([DPSOHV
DVVHVVPHQWVRQUHDOSURSHUW\IRUVSHFLDOEHQHILW
FRQIHUUHGIHHVLPSRVHGXSRQDSDUFHORUDSHUVRQDVDQLQFLGHQWRISURSHUW\RZQHUVKLSDQG IHHVIRUDSURSHUW\UHODWHGVHUYLFHVXFKDVPDQ\UHWDLOZDWHUDQGVHZHUIHHV Budget Fiscal Year 2026 Page 103 of 103 Draft - Updated as of 8/3/26
City of Corona, CA
User Fee Study
July 15, 2026
i Comprehensive User Fee Study
TABLE OF CONTENTS
TABLE OF CONTENTS ................................................................................................. i Executive Summary .................................................................................................. 1 User Fee Background ............................................................................................... 2 Background .................................................................................................................................................. 2 California User Fee History .......................................................................................................................... 2 Additional Policy Considerations ................................................................................................................. 3 Study Objective ....................................................................................................... 4 Scope of the Study ....................................................................................................................................... 4 Aim of the Report......................................................................................................................................... 4 Project Approach and Methodology ........................................................................... 5 Conceptual Approach................................................................................................................................... 5 Fully Burdened Hourly Rates........................................................................................................................ 5 Summary Steps of the Study ........................................................................................................................ 6 Allowable Costs ............................................................................................................................................ 6 Methodology ................................................................................................................................................ 7 Quality Control/Quality Assurance .............................................................................................................. 7 Reasons for cost increases/decreases over current fees............................................................................. 7 City Staff Contributions ................................................................................................................................ 8 Corona User Fees ..................................................................................................... 9 Cost Recovery............................................................................................................................................... 9 Subsidization ................................................................................................................................................ 9 Impact on Demand (Elasticity) ................................................................................................................... 10 Summary .................................................................................................................................................... 10 Airport ................................................................................................................. 11 Analysis ...................................................................................................................................................... 11 Building ................................................................................................................ 12 Analysis ...................................................................................................................................................... 12 City Clerk.............................................................................................................. 13 Analysis ...................................................................................................................................................... 13 Community Services ............................................................................................... 14
ii Comprehensive User Fee Study
Analysis ...................................................................................................................................................... 14 Development Services ............................................................................................ 15 Analysis ...................................................................................................................................................... 15 Finance ................................................................................................................ 16 Analysis ...................................................................................................................................................... 16 Fire ...................................................................................................................... 17 Analysis ...................................................................................................................................................... 17 General Services .................................................................................................... 18 Analysis ...................................................................................................................................................... 18 Human Resources .................................................................................................. 19 Analysis ...................................................................................................................................................... 19 Legal & Risk Management ....................................................................................... 20 Analysis ...................................................................................................................................................... 20 Planning ............................................................................................................... 21 Analysis ...................................................................................................................................................... 21 Police and Animal Control ...................................................................................... 22 Analysis ...................................................................................................................................................... 22 Public Works ......................................................................................................... 23 Analysis ...................................................................................................................................................... 23 Utilities ................................................................................................................ 24 Analysis ...................................................................................................................................................... 24 Appendix A – Total Allowable Cost to be Recovered .................................................. 25 Appendix B –Fully Burdened Hourly Rates ................................................................ 26 Appendix C – Cost Recovery Analysis ....................................................................... 37
1 Comprehensive User Fee Study
Executive Summary
The City of Corona engaged Willdan Financial Services (Willdan) to determine the full costs incurred by the City to support the various activities for which the City charges user fees. Due to the complexity and the breadth of performing a comprehensive review of fees, Willdan employed a variety of fee methodologies to identify the full costs of individual fee and program activities. This report and the appendices herein identify 100% full cost recovery for City services. Appendix C details the full cost and suggested fees as determined through discussion with departmental staff. The recommended fees identified herein are either at or less than full cost recovery.
2 Comprehensive User Fee Study
User Fee Background
Background
As part of a general cost recovery strategy, local governments adopt user fees to fund programs and services that provide limited or no direct benefit to the community as a whole (“User Fees”). As cities struggle to maintain levels of service and variability of demand, they have become increasingly aware of subsidies provided by the General Fund and have implemented cost-recovery targets. To the extent that governments use general tax monies to provide individuals with private benefits, and not require them to pay the full cost of the service (and, therefore, receive a subsidy), the government is limiting funds that may be available to provide other community-wide benefits. In effect, the government is using community funds to pay for private benefits. Unlike most revenue sources, cities have more control over the level of user fees they charge to recover costs, or the subsidies they can institute.
Fees in California are required to conform to the statutory requirements of the California Constitution, Proposition 218, Proposition 26, and the California Code of Regulations. The Code also requires that the City Council adopt fees by either ordinance or resolution, and that any fees in excess of the estimated total cost of rendering the related services must be approved by a popular vote of two-thirds of those electors voting because the charge would be considered a tax and not a fee. There are no fees suggested to be set above the cost of service and as such a public vote is not required.
California User Fee History
Before Proposition 13, in times of fiscal shortages, California cities were able to raise property taxes, which funded everything from police and recreation to development-related services. However, this situation changed with the passage of Proposition 13 in 1978.
Proposition 13 established the era of revenue limitation in California local government. In subsequent years, the state saw a series of additional limitations to local government revenues. Proposition 4 (1979) defined the difference between a tax and a fee: a fee can be no greater than the cost of providing the service; and Proposition 218 (1996) further limited the imposition of taxes for certain classes of fees. As a result, cities were required to secure a supermajority vote in order to enact or increase taxes. Due to the thresholds needed to increase local taxes, cities have less control and very few successful options for new revenues.
The State of California took a series of actions in the 1990’s and 2000’s to improve the State’s fiscal situation, at the expense of local governments. In 2004-05, the Educational Revenue Augmentation Funds (“ERAF”) take-away of property taxes and the reduction of Vehicle License Fees further reduced local tax revenues.
In addition, on November 2, 2010, California voters approved Proposition 26, the “Stop Hidden Taxes Initiative”, which is aimed at defining “regulatory fees” as a special tax rather than a fee, thus requiring approval by two-thirds vote of local voters. These regulatory fees are typically intended to mitigate the societal and environmental impacts of a business or person’s activities. Proposition 26 contains seven categories of exceptions. The fees analyzed as part of a user fee study typically fall under categories one through five consisting of charges for specific benefits, government service, regulatory need, for use of government property, or a fine/penalty.
3 Comprehensive User Fee Study
Additional Policy Considerations
State regulations require that municipalities update their fee schedules to reflect the actual costs of certain public services primarily benefiting users. User fees recover costs associated with the provision of specific services benefiting the user, thereby typically reducing the use of General Fund monies for such purposes.
In addition to collecting the direct cost of labor and materials associated with processing and administering user services, it is common for local governments to recover reasonable support costs. Support costs are those costs relating to a local government’s central service departments that are allocable to the local government’s operating departments. Central services support cost allocations were incorporated using the resulting indirect overhead percentages determined through the City’s cost allocation plan. A cost allocation plan identifies the central service functions of the City such as Finance, City Manager, and Human Resources and allocates their cost to the departments and funds of the City that they support. This plan was used in the user fee study to account for the burden placed upon central services by the operating departments in order to allocate a proportionate share of central service cost through the study.
As labor effort and costs associated with the provision of services fluctuate over time, a significant element in the development of any fee schedule is that it has the flexibility to remain current. Therefore, it is recommended that the City include an inflationary factor in the resolution adopting the fee schedule to allow the City to annually increase or decrease the fees by changes in a pre-approved inflationary index, as described below. However, such inflationary increases shall not exceed the reasonable estimated cost of providing the services each year.
The City may employ many different inflationary factors. The most commonly used inflator is the Consumer Price Index (CPI) as it is widely known and accepted as a measure of cost of living increase. A similar inflator is the Bureau of Labor Statistics employment cost index that has a specific series for state and local government workers. Since the primary factor for the cost of a City’s services is usually the costs of the personnel involved, tying an inflationary factor that connects more directly to the personnel costs is reasonable if there is a clear method, or current practice of obtaining said factor.
Each City should use an inflator that they believe works the best for their specific situation and needs but cannot rely solely on the CPI increase as it is incumbent upon each agency to ensure the amount of the fees charged does not exceed the reasonable estimated costs of providing the services. It is also recommended that the City perform this internal review annually with a comprehensive review of services and fees performed every five years, which would include adding, amending, or removing fees for programs/services.
4 Comprehensive User Fee Study
Study Objective
As the City of Corona seeks to efficiently manage limited resources and adequately respond to increased service demands, it needs a variety of tools. A user fee study provides assurance that the City has the best information and the best resources available to make sound decisions, fairly and legitimately set fees, maintain compliance with state law and local policies, and meet the needs of the City administration and its constituency. Given the limitations on raising revenue in local government, the City recognizes that a user fee Study is a very cost-effective way to understand the total cost of services and identify potential fee deficiencies. Essentially, a user fee is a payment for a requested service provided by a local government that primarily benefits an individual or group.
The total cost of each service included in this analysis is based on the full cost of providing City services, including direct salaries and benefits of City staff, direct departmental costs, and indirect costs from central service support. This study determines the full cost recovery fee for the City to provide each service; however, each fee is set at the City’s discretion, up to 100% of the total cost, as specified in this report.
The principal goal of the study was to help the City determine the full cost of the services that the City provides. In addition, Willdan established a series of additional objectives including:
Developing a rational basis for setting fees
Identifying subsidy amount, if applicable, of each fee in the model Ensuring compliance with State law
Developing an updatable and comprehensive list of fees Maintaining accordance with City policies and goals
The study results will help the City better understand its true costs of providing services and may serve as a basis for making informed policy decisions regarding the most appropriate fees, if any, to collect from individuals and organizations that require individualized services from the City.
Scope of the Study
The scope of this study encompasses a review and calculation of the user fees charged by the following fee groups:
Airport
Building
City Clerk
Community Services
Development Services
Finance
Fire
General Services
Human Resources
Legal & Risk Management
Planning
Police & Animal Control
Public Works
Utilities
4 Comprehensive User Fee Study
The study involved the identification of existing and potential new fees, fee schedule restructuring, data collection and analysis, orientation and consultation, quality control, communication and presentations, and calculation of individual service costs (fees) or program cost recovery levels.
Aim of the Report
The user fee study focused on the cost of City services, as City staff currently provide them at existing, known, or reasonably anticipated service and staff level needs. This report provides a summary of the study results, and a general description of the approach and methods Willdan and City staff used to determine the recommended fee schedule. The report is not intended to document all of the numerous discussions throughout the process, nor is it intended to provide an influential dissertation on the qualities of the utilized tools, techniques, or alternative approaches.
5 Comprehensive User Fee Study
Project Approach and Methodology
Conceptual Approach
The basic concept of a user fee study is to determine the “reasonable cost” of each service provided by the City for which it charges a user fee. The full cost of providing a service may not necessarily become the City’s fee, but it serves as the objective basis as to the maximum amount that may be collected.
The standard fee limitation established in California law for such fees is the “estimated, reasonable cost” principle. In order to maintain compliance with the letter and spirit of this standard, every component of the fee study process included a related review. The use of budget figures, time estimates, and improvement valuation clearly indicates reliance upon estimates for some data.
Fully Burdened Hourly Rates
The total cost of each service included in this analysis is primarily based on the Fully Burdened Hourly Rates (FBHRs) that were determined for City personnel directly involved in providing services. The FBHRs include not only personnel salary and benefits (see Appendix B), but also any costs that are reasonably ascribable to personnel. The cost elements that are included in the calculation of fully burdened rates are:
Salaries & benefits of personnel involved
Operating costs applicable to fee operations
Departmental support, supervision, and administration overhead Central service overhead costs allocated through the cost allocation plan An important factor in determining the fully burdened rate is in the calculation of productive hours for personnel. This calculation takes the available workable hours in a year of 2,080 and adjusts this figure to 1,650 productive or billable hours to account for calculated or anticipated hours’ employees are involved in non-billable activities such as paid vacation, sick leave, holidays, and other considerations, as necessary.
Dividing the full cost, including overhead, of a position by the number of productive hours provides the FBHR.
The FBHRs are then used in conjunction with time estimates, when appropriate for how a service is provided, to calculate a fee’s cost based on the personnel and the amount of their time that is involved in providing each service.
6 Comprehensive User Fee Study
Summary Steps of the Study
The process of the study is straightforward and simple in concept. The following list provides a summary of the study process steps:
Allowable Costs
This report identifies three types of costs that, when combined, constitute the fully burdened cost of a service (Appendix A). Costs are defined as
direct labor, including salary and benefits,
departmental overhead costs, and the City’s
central services overhead, where
departmental and central service overhead
costs constitute support costs. These cost
types are defined as follows:
Direct Labor (Personnel Costs): The
costs related to staff salaries for
time spent directly on fee-related
services.
Departmental Overhead: A
proportional allocation of
departmental overhead costs,
including operation costs such as
supplies and materials that are necessary for the department to function. Central Services Overhead: These costs, as provided via the City’s cost allocation plan, represent services provided by those central services departments whose primary function is to support other City departments.
Data Analysis
Department Interviews
Time Estimates
Labor Costs
Cost Allocation Plan
Building Cost Layers
Direct Services
Indirect Services
Department Overhead
City-Wide Overhead
Set Fees
Define the Full Cost of
Services
Set Cost Recovery Policy
7 Comprehensive User Fee Study
Methodology
The two methods of analysis for calculating fees used in this report are the:
Case Study Method (Standard Unit Cost Build-Up Approach): This approach estimates the actual labor and material costs associated with providing a unit of service to a single user. This analysis is suitable when City staff time requirements do not vary dramatically for a service, or for special projects where the time and cost requirements are easy to identify at the project’s outset. Further, the method is effective in instances when a staff member from one department assists on an application, service or permit for another department on an as-needed basis. Costs are estimated based upon interviews with City staff regarding the time typically spent on tasks, a review of available records, and a time and materials analysis.
Program Cost Approach: In some instances, the underlying data is not available or varies widely, leaving a standard unit cost build-up approach impractical. In addition, market factors, and policy concerns (as opposed to actual costs) tend to influence rental based fee levels more than other types of services. Willdan employed a different methodology where appropriate to fit a program’s needs and goals. Typical programmatic approach cases are facility use fees, penalties, and instances where a program cost is divided over the user base to obtain a per applicant cost for shared cost services.
Quality Control/Quality Assurance
All study components are interrelated, thus flawed data at any step in the process will cause the ultimate results to be inconsistent and unsound. The elements of our Quality Control process for user fee calculations include:
Involvement of knowledgeable City staff
Clear instructions and guidance to City staff
Reasonableness tests and validation
Internal and external reviews
Cross-checking
Reasons for cost increases/decreases over current fees
Within the fee tables in Appendix C, the differences are identified between the full costs calculated through the study and the fee levels currently in effect. The reasons for differences between the two can arise from a number of possible factors including:
Previous fee levels may have been set at levels less than full cost intentionally, based on policy decisions
Staffing levels and the positions that complete fee and service activity may vary from when the previous costs were calculated
Personnel and materials costs could have increased at levels that differed from any inflationary factors used to increase fees since the last study
Costs that this study has identified as part of the full cost of services may not have been accounted for in a previous study
8 Comprehensive User Fee Study
o Departmental overhead and administration costs
o Indirect overhead from the cost allocation plan
Changes in processes and procedures within a department, or the City as a whole Changes in the demand for services in a City may have also changed the staffing or cost structure of departments over time
City Staff Contributions
As part of the study process, Willdan received tremendous support and cooperation from City staff, who contributed and reviewed a variety of components to the study, including:
Budget and other cost data
Staffing structures
Fee and service structures, organization, and descriptions Direct and indirect work hours (billable/non-billable) Time estimates to complete work tasks
Review of draft results and other documentation
A user fee study requires significant involvement of the managers and line staff from the departments on top of their existing workloads and competing priorities. The contributions from City staff were critical to this study. We would like to express our appreciation to the City and its staff for their assistance, professionalism, positive attitudes, helpful suggestions, responsiveness, and overall cooperation.