Cities Index.
Agenda packet

Corona City Council
August 5, 2026

Document
Agenda packet
Meeting
August 5, 2026
Body
Corona City Council
Pages
2,528
Original file
290.1 MB
Text extracted from the city's file for reading and search. Open the original on pub-corona.escribemeetings.com. That file is the official record.

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
All Others 5,000 - 15,000 CY (Prop. 50,000 limit) 11,479 12,263 784 All Others more than 15,000 CY (plus $5 per 1,000 CY) (Prop. >50,000) 12,013 12,819 806 Plus scanning fee, per sheet 29 37 8
1/3 6 DS-190 Public Improvement Plan Check % of Valuation 100% Base/Minimum Fee 1,724 1,848 124
$0-$20K 20% 20% -
$20,001-$100k 3.5% 3.5% -
$100,001-$500K 2.5% 2.5% -
Over $500k 1% 1% -
Plus scanning fee, per sheet 29 37 8
Public Improvement Plan Check - Traffic
TS/Comm/etc. 1-3 sht Flat Fee 4,311 5,479 1,168
TS/Comm/etc. 3-6 sht Flat Fee 8,272 10,531 2,259
1 2 DS-220 Lot Line Adjustment Flat Fee 100%
Up to 2 lots 4,107 4,629 522
Over 2 lots 4,395 5,137 742
Plus per lot over 2 lots 1,290 1,365 75
Plus scanning fee, per sheet 29 37 8
3 6 DS-230 Right of Way Construction Inspection Flat Fee 100% Permit Issuance 69 77 8
Driveway - Residential 138 152 14
Driveway - Commercial 256 286 30
Sidewalk - 0 to 100 SF 190 211 21
Sidewalk - 101 to 1,000 SF 295 331 36
Sidewalk - 1,001 SF or More 374 420 46
Plus per SF Over 1,001 0.10 0.10 -
Surface Repair - 0-100 SF 200 217 17
Surface Repair - 101 - 1,000 SF 692 771 79
Surface Repair - 1,001 SF or More 849 950 101
Plus per SF Over 1,001 0.05 0.05 -
Curb Drain 99 107 8
Temporary Construction Material 99 107 8
Monitoring Well 318 351 33
Crane Operation 318 351 33
Other 157 178 21
2 DS-231 Water Lateral Inspection + Deposit Fee + Deposit 117 117 - 100% Deposit with charges at set fee
2 DS-232 Sewer Lateral Inspection + Deposit Fee + Deposit 117 117 - 100% Deposit with charges at set fee
Budget Fiscal Year 2026 Page 27 of 108 Updated as of 8/3/26

Page 1142 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
3 2 DS-233 Utility Service Encroach Plan Check Flat Fee 234 270 100% 36 Plus per sheet 329 369 40
2 DS-234 Double Detector Check Valve Inspection Fee + Deposit 117 117 - 100% Deposit with charges at set fee
1 2 DS-270 Stockpile / Borrow Site Permit Flat Fee 2,081 2,375 100% 294 1 DS-280 Street Closure Review Flat Fee 1,737 1,984 100% 247 Per day, after first day 157 178 21
Plus if using City equipment and staff for street closure Local Street, Daily Rate 675 675 -
Collector Street, Daily Rate 675 675 -
Secondary Street, Daily Rate 1,350 1,350 -
Major Arterial, Daily Rate 1,350 1,350 -
Barricades, each 3 3 -
No Parking Signs, per sign 1 1 -
6 DS-300 Subdivision Street Inspection Fee + Percentage 100% $1,600 - $20,000 Valuation 1,370 1,245 (125)
Plus percentage of valuation amount over $1,600 up to $20,000 20.68% 20.68% - $20,001-$100,000 Valuation 5,888 6,773 885
Plus percentage of valuation amount over $20,000 up to $100,000 11.81% 11.81% - $100,001-$500,000 Valuation 16,490 19,299 2,809
Plus percentage of valuation amount over $100,000 up to $500,000 5.76% 5.76% - Over $500,000 Valuation 42,156 48,597 6,441
Plus percentage of valuation amount over $500,001 3.00% 3.00% - 1 6 DS-301 Public Drain Improvement Inspection Fee + Percentage 100% $2,000 - $100,000 Valuation 1,157 1,166 9
Plus percentage of valuation amount over $2,000 up to $100,000 15.23% 15.23% - $100,001 - $500,000 Valuation 17,609 19,686 2,077
Plus percentage of valuation amount over $100,000 up to $500,000 1.50% 1.50% - Over $500,000 Valuation and Over 24,331 27,283 2,952
Plus percentage of valuation amount over $500,001 1.00% 1.00% - 1 6 DS-302 Private Drain Improvement Inspection Fee + Percentage 100% $2,000 - $100,000 Valuation 807 764 (43)
Plus percentage of valuation amount over $2,000 up to $100,000 15.77% 15.77% - $100,001 - $500,000 Valuation 17,685 19,470 1,785
Plus percentage of valuation amount over $100,000 up to $500,000 1.49% 1.49% - $500,001 Valuation and Over 24,016 26,809 2,793
Plus percentage of valuation amount over $500,001 1.10% 1.10% - 1 2 DS-305 Waiver of Improvement Requirements Flat Fee 968 1,448 100% 480 Budget Fiscal Year 2026 Page 28 of 108 Updated as of 8/3/26

Page 1143 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 DS-310 Surety and Subordination Review Service Flat Fee 1,894 2,050 100% 156 2 DS-315 Lien Removal Flat Fee 1,759 1,959 100% 200
Plus current County Recorder fee Current Fee Current Fee - 3 DS-330 Wide and Overload Permit (Daily) Federal
Limit
16 16 - Federal
Limit
3 DS-340 Wide and Overload Permit (Annual) Federal
Limit
102 90 (12) Federal
Limit
3 DS-350 Haul Route Permit Flat Fee 100%
1,000 - 5,000 CY 824 938 114
5,001 - 25,000 CY 982 1,117 135
25,001+ CY for each additional 5,000 315 357 42
1 2 DS-360 Stockpile Plan Check Flat Fee 2,795 2,983 100% 188 Plus scanning fee, per sheet 29 37 8
1 2 DS-370 Landscape and Irrigation Plan Review (LMD) Fee + Deposit 3,398 3,927 100% 529 Plus scanning fee, per sheet 29 37 8
Deposit with charges at set fee
2 DS-380 Map Scanning Service, per sheet Flat Fee 24 31 100% 7 6 DS-420 Record of Survey - Review Flat Fee 1,096 1,303 100% 207 2 DS-430 Easement Processing / Review Legal Description Flat Fee 1,740 1,846 100% 106 2 DS-440 City Property Acquisition Processing Fee + Deposit 4,015 4,416 100% 401 Deposit with charges at set fee
1 DS-450 Street Name Sign Fabrication Flat Fee 342 401 100% 59 Includes two signs/poles and supply fee
1 2 DS-480 Water Quality Management Plan Review Flat Fee 4,179 4,540 100% 361 1 2 DS-485 Revised Water Quality Management Plan Check Flat Fee 1,433 1,586 100% 153 1 2 DS-490 Water Quality Management Plan Inspection Flat Fee 577 678 100% 101 1 6 DS-510 Deferral / Waiver of Impact Fees Flat Fee 2,346 2,304 100% (42) Plus actual cost for legal review and advertising (if set for public hearing) Full Cost Full Cost - 1 2 DS-511 Waiver of Permits Fee Request Flat Fee 1,534 1,508 100% (26) 2 DS-520 Issue Revised Bond and Fee Letter Flat Fee 174 183 9 100% Budget Fiscal Year 2026 Page 29 of 108 Updated as of 8/3/26

Page 1144 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 DS-530 Water / Sewer Study Fee Fee + Deposit 1,419 1,557 100% 138 Deposit with charges at set fee
1 1 DS-540 Bond Substitution Flat Fee 1,727 610 (1,117) 100% 1 1 DS-550 Bond Reduction Flat Fee 2,204 1,312 100% (892) 1 DS-560 Additional Address on Existing Site Flat Fee 180 278 100% 98 Per Address
1 DS-570 Change of Address Request Flat Fee 728 800 100% 72 Per Address
1 DS-580 Change of Street Name Request Flat Fee 1,841 1,979 100% 138 Per Address
2 DS-600 Utility Locating and Marking
Per Ticket
PassThrough PassThrough PassThrough
- 100%
1 2 DS-610 Retaining Wall Plan Check Fee + Deposit 2,193 2,382 100% 189 Deposit with charges at set fee
2 DS-630 Will Serve Letter Flat Fee 342 368 100% 26
1 2 DS-660 Plan Check Time Extension Fee Flat Fee 1,067 1,112 100% 45 2 DS-670 Dry Utility - Private Street Inspection Per Day 120 126 100% 6 2 DS-680 Process Cancellation Refund Fee Flat Fee 127 156 100% 29 2 DS-690 Miscellaneous Clerk Recording Fee Actual Cost Actual Cost Actual Cost - 100% 3 2 DS-1005 Address Issuance Flat Fee 100%
Per Address, 1-5 (Base Fee) 550 632 82
Base Fee, plus per address, 6-40 40 49 9
Base Fee, plus 40 addresses, plus per address, 41-150 22 27 5 Base Fee, plus 150 addresses, plus per address, over 150 11 13 2 2 DS-1020 Rework / Unpermitted Work Deposit
Deposit with charges at Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
- 100%
3 2 DS-1025 Fire Flow Report Flat Fee 447 501 100% 54
2 DS-1030 Legal Lot Review Fee + Deposit 611 654 100% 43 2 DS-1035 GIS Site Exhibit Flat Fee 156 155 (1) 100%
Budget Fiscal Year 2026 Page 30 of 108 Updated as of 8/3/26

Page 1145 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 DS-1040 Suite Address Issuance - per building, 1-5 suites (Base Fee) Flat Fee 282 384 102 100% Suite Address Issuance - over 5 suites, per suite 6-40 21 24 3 Suite Address Issuance - over 40 suites, per suite 41-150 12 13 1 Suite Address Issuance - over 150 suites, per suite 3 3 - 2 DS-1045 Engineering Minor Site Plan Review Flat Fee 623 759 100% 136 2 DS - 1050 Meter Addressing Fee Flat Fee - 341 100% 341 Fee Discount / Waiver Notes:

1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).

2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).

3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).

GENERAL SERVICES
2 GS-010 Photocopy Service - General City Per Page 0.25 0.25 - 0 - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
For Electronic Media Storage Copy - $2 per device 2 2 - 2 GS-020 Record Compilation Service Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
First 15 minutes free per month, thereafter at full cost in 15 minute intervals plus any material cost and applicable postage costs
This fee center is for use when no other fee center exists 1 GS-030 Notary Public Service Set by State 15 15 - Set by State (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Fee is set by State law - Civil Code Section 8211
2 GS-040 Process City Property Damage Fees Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Full costs of personnel, materials, equipment, and property 2 GS-055 Building Records Archiving Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Budget Fiscal Year 2026 Page 31 of 108 Updated as of 8/3/26

Page 1146 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 GS-070 Franchise Processing Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
$2,500 Deposit with charges at fully allocated hourly rates for all involved personnel.

Plus outside costs, notice and publication costs, and document preparation costs. 2 GS-110 Banner Installation Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Deposit with charges at actual costs
2 GS-160 Purchase of City Standards Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Actual cost of document production
2 GS-170 Miscellaneous Services Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Deposit determined by staff with charges at the fully allocated hourly rate for all personnel involved plus any outside services
2 GS-1000 Other Governmental Items for Purchase Actual Cost Actual Cost Actual Cost - 100% (Moved from City Clerk &
General Services; now a
separate section under
General Services)
Allows the City to offer purchases of such items (i.e. RTA Bus Passes) from other governmental agencies to the public
2 GS-1010 Subpoena / Witness Fees Actual Cost Actual Cost Actual Cost - 100% Sworn Fire and Police personnel - Deposit per Government Code Section 68097.2, charges at fully allocated hourly rates for personnel involved plus outside equipment and materials.

Other City personnel - Deposit per Government Code Section 68097, charges at fully allocated hourly rates for personnel involved plus outside equipment and materials.

FINANCE DIVISION
2 FN-010 Assessment Bond Payoff Calculation Per Parcel $ 73 $ 74 $ 100% 1 2 FN-011 Disclosure of Special Tax (Mello-Roos) Set by State 15 15 - Set by State Set by State GC 53340.2(a)
2 FN-012 Disclosure of Special Assessment Set by State 10 10 - Set by State Set by State SHC code 8500
(Moved from City Clerk &
General Services; now a
separate section under
General Services)
Budget Fiscal Year 2026 Page 32 of 108 Updated as of 8/3/26

Page 1147 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 FN-013 Escrow / Retention Account Monitor 100%
One-Time Setup Per Account 350 361 11
Monthly Maintenance Per Month 95 117 22
2 FN-015 Mello-Roos Bond Payoff Calculation Per Parcel 194 135 100% (59) Plus any outside costs Current Fee Current Fee -
2 FN-016 Assessment Bond Payoff Processing Per Parcel 210 176 100% (34) Plus any outside costs Current Fee -
2 FN-017 Mello-Roos Bond Payoff Processing Per Parcel 454 379 100% (75) Plus any outside costs Current Fee -
5 FN-018 Special Assessment Foreclosure Administration Per Property 322 277 100% (45) Plus County Administrative Fee Current Fee -
Per Foreclosed Property
Govt Code Sections 53356.2
5 FN-030 Returned Check Fee Per Check 41 43 100% 2
Per Government Code section 6157
2 FN-040 Check Reissuance Per Check 100%
Employee Payroll Check Request No Charge -
Individuals/Business Owners 62 77 15
Corporations 70 77 7
3rd Party Request 101 112 11
2 FN-060 Financial Document Purchase Actual Cost Actual Cost Actual Cost - 100% Actual cost of document reproduction
2 FN-1005 Annexation into CFD 2016-1 Per Application 3,372 4,043 100% 671 Plus outside consultant actual cost Plus
Consultant Fee
Plus
Consultant Fee
-
2 FN-1010 Annexation into CFD 2016-3 Per Application 7,600 9,454 100% 1,854 Plus outside consultant actual cost
Plus
Consultant Fee
Plus
Consultant
Fee
-

FIRE DEPARTMENT
3 FR-020 Engine Company Reinspection
Per Each
Re-inspection $ 138 $ 140 $ 50% 2
Budget Fiscal Year 2026 Page 33 of 108 Updated as of 8/3/26

Page 1148 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
5 FR-030 Fire False Alarm Response - Commercial / MFR Penalty Penalty Per Calendar Year:
3rd Response 575 575 -
4th Response 575 575 -
5th & Subsequent Responses 575 575 -
Per CMC 8.30.170
5 FR-035 Fire False Alarm Response - SFR Penalty Penalty Per Calendar Year:
3rd response 575 575 -
4th response 575 575 -
5th & Subsequent Responses 575 575 -
Per CMC 8.30.170
2 FR-040 Emergency Incident Report Service Per Report Page 0.25 0.25 - 40 - 100% Electronic Media Storage Copy Per Copy 2 2 -
Fee covered by the Public Records Act - see GS-10 General city copy charges 2 3 FR-060 Special Fire Permit Inspection Per Inspection 205 220 100% 15 Late Payment Fee - 30+ Days Penalty 75 75 - Penalty
2 3 FR-070 Fire Prevention Division Inspection Per Inspection 100% A1 & A4 Occupancies 305 320 15
A1 & A4 Occupancies - CUPA Program Discount 150 160 10
A2 & A3 Occupancies 190 200 10
A2 & A3 Occupancies - CUPA Program Discount 95 100 5
E Occupancies 1-100 Students 215 230 15
E Occupancies 1-100 Students - CUPA Program Discount 110 115 5 E Occupancies 101-999 Students 330 355 25
E Occupancies 101-999 Students - CUPA Program Discount 165 175 10 E Occupancies 1,000-3,000 Students 445 480 35
E Occupancies 1,000-3,000 Students - CUPA Program Discount 220 240 20 E Occupancies 3,001+ Students 730 790 60
E Occupancies 3,001+ Students - CUPA Program Discount 365 395 30 I Occupancies (except I2) 330 355 25
I Occupancies (except I2) - CUPA Program Discount 165 175 10 I2 Occupancies 785 850 65
I2 Occupancies - CUPA Program Discount 395 425 30
B, M & U Occupancies 1-5,000 SF 160 170 10
B, M & U Occupancies 1-5,000 SF - CUPA Program Discount 80 85 5 B, M & U Occupancies 5,001-10,000 SF 215 230 15
B, M & U Occupancies 5,001-10,000 SF - CUPA Program Discount 110 115 5 B, M & U Occupancies 10,001+ SF 330 355 25
B, M & U Occupancies 10,001+ SF - CUPA Program Discount 165 175 10 F, H & S Occupancies 1-5,000 SF 215 230 15
F, H & S Occupancies 1-5,000 SF - CUPA Program Discount 110 115 5 Budget Fiscal Year 2026 Page 34 of 108 Updated as of 8/3/26

Page 1149 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
F, H & S Occupancies 5,001-100,000 SF 330 355 25
F, H & S Occupancies 5,001-100,000 SF - CUPA Program Discount 165 175 10 F, H & S Occupancies 100,001-300,000 SF 445 480 35
F, H & S Occupancies 100,001-300,000 SF - CUPA Program Discount 220 240 20 F, H & S Occupancies 300,001+ SF 555 600 45
F, H & S Occupancies 300,001+ SF - CUPA Program Discount 280 300 20 Multi-Family Residential - Housing Unit Fire Inspection Fees Per Calendar Year:
3-4 Units 255 275 20
3-4 Units - CUPA Program Discount 125 135 10
5-9 Units 480 495 15
5-9 Units - CUPA Program Discount 240 245 5
10-49 Units 650 710 60
10-49 Units - CUPA Program Discount 325 355 30
50-99 Units 935 1,025 90
50-99 Units - CUPA Program Discount 465 510 45
100-199 Units 1,280 1,400 120
100-199 Units - CUPA Program Discount 640 700 60
200-299 Units 1,445 1,585 140
200-299 Units - CUPA Program Discount 725 790 65
300-399 Units 1,615 1,770 155
300-399 Units - CUPA Program Discount 810 885 75
400-499 Units 1,785 1,960 175
400-499 Units - CUPA Program Discount 895 980 85
500-599 Units 2,070 2,270 200
500-599 Units - CUPA Program Discount 1,035 1,135 100
600+ Units 2,585 2,830 245
600+ Units - CUPA Program Discount 1,290 1,415 125
Per Health and Safety Code section 13146 standard
Multi-Family Residential - Housing Unit Fire Inspection Fees Per Calendar Year:

Common Area Fire Inspection 535 585 50
Common Area Fire Inspection - CUPA Program Discount 270 290 20 Per Health and Safety Code section 13146 standard
3 FR-075 Fire Prevention After Hours Inspection Per Hour at OT Rate
170 200 100% 30
3 FR-080 Fire Prevention Division Reinspection Per Hour 1st Inspection 115 125 100% 10
To promote compliance, fee can be waived at the discretion of the Fire Chief 2nd and Subsequent Inspections 130 135 5
3 FR-090 Hazardous Materials Disclosure Per Year 100%
Budget Fiscal Year 2026 Page 35 of 108 Updated as of 8/3/26

Page 1150 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 6 chemicals or less/5,000 sq ft or less
300 340 40
HazMat Disclosure Inspection - 6 chemicals or less/5,000 sq ft or less 115 155 40 HazMat review + inspection - 6 chemicals or less/5,000 sq ft or less 415 500 85 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 7-12 chemicals/5,001 - 10,000 sq ft
385 435 50
HazMat Disclosure Inspection - 7-12 chemicals/5,001 - 10,000 sq ft 140 185 45 HazMat review + inspection - 7-12 chemicals/5,001 - 10,000 sq ft 525 620 95 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 13-20 chemicals/10,001 sq ft or more
470 530 60
HazMat Disclosure Inspection - 13-20 chemicals/10,001 sq ft or more 170 220 50 HazMat review + inspection - 13-20 chemicals/10,001 sq ft or more 640 750 110 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 21-50 chemicals/10,001 sq ft or more
585 655 70
HazMat Disclosure Inspection - 21-50 chemicals/10,001 sq ft or more 225 280 55 HazMat review + inspection - 21-50 chemicals/10,001 sq ft or more 810 935 125 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 51-200 chemicals/10,001 sq ft or more
755 840 85
HazMat Disclosure Inspection - 51-200 chemicals/10,001 sq ft or more 285 340 55 HazMat review + inspection - 51-200 chemicals/10,001 sq ft or more 1,040 1,185 145 HazMat Disclosure CERS Review/Admin/Program Oversight/Audit - 201 or more chemicals/10,001 sq ft or more
980 1,090 110
HazMat Disclosure Inspection - 201 or more chemicals/10,001 sq ft or more 340 405 65 HazMat review + inspection - 201 or more chemicals/10,001 sq ft or more 1,320 1,495 175 Late Payment Fee Penalty
30-60 Days 50% Penalty 170 Based on Permit
Fee
-
Over 60 Days 100% Penalty 340 Based on Permit
Fee
-
Plus Late Filing Fee if forms are not filed within 35 days Penalty 1st violation 100 100 -
2nd violation 200 200 -
3rd violation 500 500 -
Annual review is completed and inspection is conducted every three years 3 FR-100 Hazardous Materials Response Actual Cost Actual Cost Actual Cost - 100% Full costs for all responding city personnel, apparatus, equipment and materials 3 FR-120 State-Mandated Fire Pre-inspection of Care Facility Per Inspection 215 230 100% 15 Per CA HSC 13235
3 FR-130 Alterations to Flammable and/or Combustible Liquid Tanks Per Inspection 100% First Tank 270 290 20
Each Additional Tank 85 95 10
2 FR-140 Hazard / Weed Abatement Actual Cost Actual Cost Actual Cost - 100% Actual cost of clearing the lot plus City staff time at fully allocated hourly rate Budget Fiscal Year 2026 Page 36 of 108 Updated as of 8/3/26

Page 1151 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
5 FR-154 Field Inspection-Including but not limited to: Radio Test, Fuel Modification Inspection, Emergency System Repair Inspection
Per Inspection 125 140 100% 15
5 FR-155 Negligent Incident Response Actual Cost Actual Cost Actual Cost - 100% Charge the actual fully allocated cost of all personnel, apparatus, equipment, and materials, including specialized technical resources, such as arson dogs, engineers, lab technicians, or lab fees, up to state imposed limits.
5 FR-156 Property Sales Inspection Per Inspection 170 175 100% 5 3 FR-160 Counter Fire Permit Per Permit 40 50 100% 10
3 FR-170 Review of Fuel Modification Plan Per Review 1,470 1,690 100% 220 Plus legal fees if City Attorney involved Full Cost Full Cost - 2 FR-200 Emergency Medical Services Response 0 - 10%
Subscription Program Per Year 60 60 -
Non-Subscribers Per Response 400 400 -
1/3 1/6 FR-250 New Sprinkler Plan Check / Inspection 100% Plan Check: Per Plan Check
1 - 100 Heads 475 490 15
101 - 500 Heads 535 570 35
501+ Heads 595 645 50
PC Phasing, each additional model, 1-100 heads 20% of PC Fee 105 98 (7) Inspection: Per 2 Inspections
1 - 100 Heads 615 625 10
101 - 500 Heads 720 750 30
501+ Heads 860 905 45
After 2nd Inspection - Original Fee
1 1/6 FR-255 FR-255 TI Sprinkler Plan Check / Inspection 100% Plan Check: Per Plan Check
1 - 20 Heads 315 330 15
21 - 100 Heads 375 410 35
101+ Heads 495 530 35
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
1 - 20 Heads 295 300 5
21 - 100 Heads 580 595 15
100+ Heads 720 715 (5)
After 2nd Inspection - Original Fee
1 1/6 FR-257 Underground Fire Line Plan Check / Inspection 100% Plan Check: Per Plan Check
0 - 500 linear feet 420 450 30
Budget Fiscal Year 2026 Page 37 of 108 Updated as of 8/3/26

Page 1152 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
501 - 1,000 linear feet 540 570 30
1,000+ linear feet 660 725 65
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
0-500 linear feet 650 655 5
501-1,000 linear feet 935 905 (30)
1,000+ linear feet 1,220 1,120 (100)
After 2nd Inspection - Original Fee
1 1/6 FR-260 High Pile Storage Plan Check Per Plan Check 100% 0 - 500 square feet 360 370 10
501 - 2,500 square feet 420 450 30
2,501 - 20,000 square feet 480 530 50
20,001 - 500,000 square feet 600 610 10
500,001+ square feet 660 690 30
1 1/6 FR-270 Fire Alarm Plan Check / Inspection 100%
Plan Check: Per Plan Check
Over the Counter 240 255 15
Standard 540 570 30
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
Over the Counter 260 300 40
Standard 470 485 15
Plus Each Device Over 9, per device 7 8 1
After 2nd Inspection - Original Fee
Waterflow Monitoring
Plan Check Per Plan Check 360 370 10
Inspection Per Inspection 330 355 25
1 1/6 FR-280 Fire Suppression System Plan Check / Inspection 100% Plan Check: Per Plan Check
Over the Counter 240 255 15
Standard 360 370 10
PC Phasing - separate fee for each fee based on the number of heads Inspection: Per Inspection
Over the Counter 260 295 35
Standard 330 360 30
After 2nd Inspection - Original Fee
2 FR-330 Public Service Lift and Assist Per Response 430 490 100% 60 2 FR-340 Medical Event Team (MET) - EMS Actual Cost Actual Cost Actual Cost - 100% 2 FR-350 Juvenile Fire Setters Intervention Per Request 520 575 55 100% Budget Fiscal Year 2026 Page 38 of 108 Updated as of 8/3/26

Page 1153 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 FR-400 Inspection Cancellation Fee Penalty 125 125 - Penalty If cancellation occurs less than 24 hours of booked appointment 1 2 FR-410 Expired Permit / Extension Per Extension 120 140 100% 20 1 1 FR-420 Expedited Plan Check 1.5x Regular
Plan Check Fee

1.5x Regular
Plan Check Fee

1.5x Regular
Plan Check Fee
- 100%
2 FR-430 Additional time for any other service not listed on fee schedule Actual Cost Actual Cost Actual Cost - 100% 3 FR-440 Business License Fire Inspection Fee Flat Fee 150 160 100% 10 Fee Discount / Waiver Notes:

1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).

2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).

3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).

HUMAN RESOURCES
2 HR-010 Fingerprinting on Request Per Request $ 86 $ 100 $ 100% 14 Providing fingerprint service on request for employment or personal reasons Plus State of California / Department of Justice Processing Fees

LEGAL AND RISK MANAGEMENT
2 LRM-010 Communication Site License Agreement Per Agreement $ 2,346 $ 2,412 $ 66 100% 2 LRM-020 Communication Site License Agreement Modification / Amendment Per Application 1,183 1,180 (3) 100% 2 LRM-030 Communication Site License Agreement Minor Consent Letter Per Letter 340 416 100% 76 Fee may be waived in whole or in part at discretion of City Attorney/Legal & Risk Management Director.
2 LRM-040 Small Cell Site Master License Agreement Per Agreement 505 589 84 100% 2 LRM-050 Small Cell Site Modification / Amendment Per Amendment 466 539 73 100% 2 LRM-060 Small Cell Site Location Specific Supplement Per Supplement 438 516 78 100% City Manager has authority to waive in whole or in part pursuant to the terms of the applicable Small Cell Site Master License Agreement.
2 LRM-070 City Attorney Office Review Actual Cost Actual Cost Actual Cost - 100%

PLANNING DIVISION
1 1 PL-BZ-010 Ancillary Game Arcade Review Flat Fee $ 1,391 $ 1,500 $ 109 100% Budget Fiscal Year 2026 Page 39 of 108 Updated as of 8/3/26

Page 1154 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-030 Cul-de-Sac Waiver Flat Fee 857 834 100% (23) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-045 Conditional Use Permit - Minor Flat Fee 3,652 3,673 100% 21 Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-070 Model Home Permit Review Flat Fee 1,885 1,817 100% (68) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-080 Moved Building Review Flat Fee 3,324 3,373 100% 49 Plus Scanning Fee 67 64 (3)
Moved Historic Building Review at 50% of Fee 1,662 1,686.50 25 Moved Historic Building Scanning Fee at 50% of Fee 34 32 (2) 1 1 PL-BZ-090 Non-Conforming Building Review Flat Fee 1,592 1,547 100% (45) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-100 Parcel Map Waiver Review Flat Fee 3,817 4,002 100% 185 Plus Scanning Fee 67 64 (3)
2 1 PL-BZ-130 Special Use Permit Flat Fee 100%
New 1,457 1,524 67
Renewal 578 1,095 517
1 1 PL-BZ-140 Medical Office in Residential Zone Review Flat Fee 1,473 1,857 100% 384 Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-150 Certificate of Compliance Review Flat Fee 3,159 3,128 100% (31) Plus Scanning Fee 67 64 (3)
1 1 PL-BZ-170 Tentative Tract Map Rephasing Review Flat Fee 2,662 2,843 100% 181 1 1 PL-BZ-180 Film Permit Review Flat Fee 1,121 1,385 100% 264 1 1 PL-BZ-190 Telecommunications Facilities Review Flat Fee 1,404 1,062 100% (342) Plus Scanning Fee 67 64 (3)
Plus per application if Maintenance Services is involved 137 256 119 1 2 PL-BZ-200 Public Notice Fee for Minor CUPs Flat Fee 137 147 100% 10 1 1 PL-BZ-210 Noise Variance Per CMC Section 17.84.040(H) Flat Fee 1,767 1,892 125 100% 1 1 PL-CC-010 Agricultural Preserve Cancellation Flat Fee 2,265 4,755 100% 2,490 Plus Scanning Fee 67 64 (3)
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Budget Fiscal Year 2026 Page 40 of 108 Updated as of 8/3/26

Page 1155 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) 1 1 PL-CC-020 Amended Map Review Flat Fee 5,317 4,152 (1,165) 100% Plus Scanning Fee 67 64 (3)
1 1 PL-CC-040 Density Bonus Agreement Review Flat Fee 3,003 3,749 100% 746 Plus Scanning Fee 67 64 (3)
1 1 PL-CC-070 Study Review
Deposit with Charges at Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
- 100%
1 1 PL-CC-090 Historic Property Preservation Flat Fee 2,431 2,184 100% (247) Plus Scanning Fee 67 64 (3)
Plus Recording Fee for Land Current Fee Current Fee -
1 1 PL-DP-010 Minor Specific Plan Amendment DPR Flat Fee 3,852 4,354 100% 502 1 1 PL-DP-011 Major Specific Plan Amendment DPR Flat Fee 8,106 8,356 100% 250 1 1 PL-DP-012 Specific Plan DPR Flat Fee 17,626 18,572 100% 946 1 1 PL-DP-020 Tentative Tract Map DPR Base Fee 7,397 7,785 100% 388 Plus per Lot Per Lot 70 65 (5)
1 1 PL-DP-030 Parcel Map DPR Flat Fee 5,493 5,777 100% 284 1 1 PL-DP-050 Precise Plan or CUP for Multi-Family Residential Unit Development DPR - base fee Base Fee 6,566 5,685 100% (881) Plus per Dwelling Unit Per Dwelling Unit 20 43 23
1 1 PL-DP-060 Commercial / Industrial / All Other Plan DPR Flat Fee 5,177 5,459 100% 282 1 1 PL-DP-070 Parcel Map / Tract Map Extension of Time DPR Flat Fee 2,811 2,903 100% 92 1 1 PL-DP-150 Extension of Time DPR Flat Fee 779 1,061 100% 282 1 1 PL-DP-160 Precise Plan or CUP for Single Family Residential Unit Development - DPR Base Fee - 5,685 100% 5,685 Plus per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-DP-170 Senate Bill 6 Housing Development (Precise Plan or Conditional Use Permit) - DPR Base Fee - 5,685 100% 5,685 Plus Per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-DP-180 Assembly Bill 2011 Housing Development - DPR Base Fee - 5,685 100% 5,685 Plus Per Dwelling Unit fee Per Dwelling Unit - 43 43
Budget Fiscal Year 2026 Page 41 of 108 Updated as of 8/3/26

Page 1156 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 1 PL-DP-190 Senate Bill 330 Preliminary Application - Housing Development (Precise Plan or Conditional Use Permit)
Base Fee - 5,685 100% 5,685
Plus Per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-DP-200 Senate Bill 330 Preliminary Application - Tentative Tract Map Base Fee - 7,785 7,785 100% Plus Per Lot Fee Per Lot Fee - 65 65
Senate Bill 330 Preliminary Application - Parcel Map Base Fee 5,777 5,777 1 1 PL-DP-210 Senate Bill 330 Preliminary Application - Specific Plan Flat Fee - 18,572 18,572 100% PL-DP-220 Senate Bill 330 Preliminary Application - Major Specific Plan Amendment Flat Fee - 8,356 8,356 100% 1 1 Senate Bill 330 Preliminary Application - Major Specific Plan Amendment Flat Fee - 4,354 4,354 1 1 PL-DP-230 Affordable Housing Overlay Residential Development - DPR Base Fee - 5,685 5,685 100% Plus per Dwelling Unit fee Per Dwelling Unit - 43 43
1 1 PL-MS-010 Banner Review Flat Fee 67 64 100% (3)
1 3 PL-MS-020 Garage Sale Permit Flat Fee 10 10 - 15%
Up to 3 Days
1 6 PL-MS-060 Promotional Construction Sign Permit Review Flat Fee 67 64 100% (3) 1 1 PL-MS-080 Sign Permit Review Flat Fee 100 96 100% (4) 1 2 PL-MS-100 Title Company Zoning Letters Flat Fee 282 282 - 100% Per Request
1 1 PL-MS-140 Sign Reface Review Flat Fee 33 32 100% (1) 1 1 PL-MS-150 Substantial Conformance Review Flat Fee 2,078 2,260 100% 182 1 1 PL-MS-160 Minor Modification (Precise Plan) Flat Fee 1,662 1,652 100% (10) Plus Scanning Fee 67 64 (3)
1 3 PL-MS-170 Code Enforcement Re-inspection Flat Fee 311 304 100% (7) Per inspection for every inspection after the first two inspections Budget Fiscal Year 2026 Page 42 of 108 Updated as of 8/3/26

Page 1157 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 1 PL-MS-175 Public Notice Sign Processing Flat Fee 158 36 100% (122) Per Application
1 1 PL-MS-180 Digitized Mapping Flat Fee 100%
Per Acre - Less than 50 Acres 294 279 (15)
Per Acre - 50 Acres or More 702 667 (35)
1 1 PL-MS-190 Scanning Services Flat Fee 67 64 100% (3) Scanning the plans and maps of new development
1 1 PL-MS-200 General Plan Maintenance 5% of Bldg
Permit Fee
5% of Bldg
Permit Fee
5% of Bldg
Permit Fee
- 100%
1 1 PL-MS-210 Cottage Food Industry Permit Flat Fee 67 64 100% (3) 1 1 PL-MS-220 Planning Director Modification Flat Fee 1,380 1,412 32 100% CMC 16.12.070 - non substantive change in COA
1 1 PL-MS-250 Surface Mine Annual Inspections Deposit
+ Full Cost
Deposit
+ Full Cost
Deposit
+ Full Cost
- 100%
1 1 PL-MS-260 Low Barrier Navigation Center Flat Fee 561 1,299 100% 738 1 1 PL-PC-010 Annexation Request Review Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-015 Community Facility Plan Amendment Flat Fee 5,155 7,773 100% 2,618 Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-020 Architectural Review Flat Fee 3,294 3,076 100% (218) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-030 Change of Zone Review Flat Fee 6,700 6,443 100% (257) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-040 Conditional Use Permit - Major Flat Fee 8,655 8,390 100% (265) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
Budget Fiscal Year 2026 Page 43 of 108 Updated as of 8/3/26

Page 1158 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 1 PL-PC-050 Modification to Major CUP Flat Fee 5,030 4,932 100% (98) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-060 Development Agreement Review Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-065 Environmental Categorial Exemption Flat Fee 336 228 100% (108) 1 1 PL-PC-070 Environmental Impact Assessment - Negative Declaration or Mitigated Negative Declaration Plus Technical Studies Review
Flat Fee 9,036 Deposit
+ Full Cost
- 100%
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-075 Environmental Impact Report Review - Deposit + Full Cost
100%
Deposit set at 30% of contract amount with charges at full cost Deposit + Full Cost
Deposit
+ Full Cost
-
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-080 General Plan Amendment Review Base Fee 8,842 8,428 100% (414) Plus per Acre Per Acre 20 229 209
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-110 Residential Parcel Map Review Flat Fee 6,870 6,832 100% (38) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-120 Commercial / Industrial Parcel Map Review Flat Fee 8,373 8,280 100% (93) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-150 Precise Plan Review Base Fee 9,334 9,242 100% (92) Plus per Dwelling Unit Per
Dwelling Unit
20 17 (3)
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - Budget Fiscal Year 2026 Page 44 of 108 Updated as of 8/3/26

Page 1159 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 1 PL-PC-160 Precise Plan Modification Review Base Fee 6,519 6,332 100% (187) Plus per Dwelling Unit Per
Dwelling Unit
20 17 (3)
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-170 Reversion to Acreage Flat Fee 7,737 7,927 100% 190 Plus Scanning Fee 67 64 (3)
1 1 PL-PC-180 Similar Use Review Flat Fee 2,648 2,521 100% (127) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-190 Specific Plan Review - deposit with charges at full cost Deposit + Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-200 Specific Plan Amendment Review - minor revision Flat Fee 100% Minor Revision 6,059 5,842 (217)
Major Revision 9,935 10,425 490
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-230 Sphere of Influence Amendment Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-240 Surface Mining Permit Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
Budget Fiscal Year 2026 Page 45 of 108 Updated as of 8/3/26

Page 1160 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 1 PL-PC-245 Surface Mining Reclamation Plan
Deposit
+ Full Cost
100%
Deposit with Charges at Full Cost Deposit
+ Full Cost
Deposit
+ Full Cost
-
Plus Digitized Mapping Per Acre - Less than 50 Acres 294 279 (15) Plus Digitized Mapping Per Acre - 50 Acres or More 702 667 (35) Plus Scanning Fee 67 64 (3)
1 1 PL-PC-250 Tentative Tract Map Review Base Fee 12,227 12,273 100% 46 Plus per Lot Per Lot 49 43 (6)
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-270 Resubmitted Parcel Map Flat Fee 5,713 5,796 100% 83 Plus Scanning Fee 67 64 (3)
1 1 PL-PC-280 Resubmitted Tract Map Review Base Fee 6,804 6,787 100% (17) Plus per Lot Per Lot 49 43 (6)
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-290 Major Variance Review Base Fee 6,389 5,950 100% (439) Plus per Lot Per Lot 28 23 (5)
Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad (if set for Public Hearing) Current Fee Current Fee - 1 1 PL-PC-300 Waiver or Modification Review Flat Fee 2,807 3,033 100% 226 1 1 PL-PC-310 Zone Text Amendment Review Flat Fee 6,273 5,891 100% (382) Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-340 Appeal to the Planning Commission Flat Fee 3,865 3,669 100% (196) 1 1 PL-PC-350 Extension of Time - PP Flat Fee 2,703 2,736 100% 33 1 1 PL-PC-360 Extension of Time - CUP Flat Fee 2,703 2,736 100% 33 1 1 PL-PC-370 Historic Resource Nomination Flat Fee 300 300 - 8% Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-PC-380 Deletion or Reduced Listing of Historic Resources Flat Fee 3,896 4,455 559 100% 1 1 PL-PC-390 Major Alteration, Relocation, or Demolition of Historic Districts & Landmarks, Including Demolitions of Heritage Properties
Flat Fee 4,172 4,305 100% 133
Budget Fiscal Year 2026 Page 46 of 108 Updated as of 8/3/26

Page 1161 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 1 PL-PC-400 Historic Structure of Merit Nominations Flat Fee 300 300 - 8% Plus Scanning Fee 67 64 (3)
Plus Cost of Legal Ad Current Fee Current Fee -
1 1 PL-ZA-010 Alcoholic Beverage Application Review Flat Fee 1,126 1,006 100% (120) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-060 Minor Variance Review Flat Fee 2,698 2,439 100% (259) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-070 Parking Determination Review Flat Fee 2,440 1,664 100% (776) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-080 Commercial / Industrial Freeway Sign Review Flat Fee 1,461 1,253 100% (208) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-090 Temporary Use Permit Flat Fee 67 64 100% (3) 1 1 PL-ZA-100 Zoning Administrator Application Flat Fee 1,461 1,253 100% (208) Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-120 Adult Use Planning Permit Flat Fee 6,672 7,313 100% 641 Plus Scanning Fee 67 64 (3)
1 1 PL-ZA-130 Minor Modifications to Telecommunication Facilities Flat Fee 863 742 100% (121) 1 1 PL-ZA-140 Donation Collection Container Permit Flat Fee 268 145 100% (123) 1 1 PL-ZA-150 Smoking Lounges Ancillary Use Application Fee Flat Fee 532 1,187 100% 655 1 PL-CB-010 Commercial Cannabis Permit - Storefront Retailer Flat Fee + Actual
11,427 9,386 (2,041) 100%
Plus pro rata share of actual cost of Independent Facilitator for Merit-Based Evaluation Process (Actual Cost / Number of Applicants)
Actual Cost Actual Cost -
1 PL-CB-020
Commercial Cannabis Permit – Non-storefront Retailer/
Manufacturing / Distribution / Testing Laboratory Flat Fee 10,443 8,322 (2,121) 100%
1 PL-CB-030 Commercial Cannabis Permit – Annual Renewal Flat Fee 2,180 3,761 100% 1,581 5 PL-CB-040 Commercial Cannabis Permit – Annual Renewal Late Fee Flat Fee 100% 45-59 days prior to permit expiration 473 473 -
30-44 days prior to permit expiration 945 945 -
15-29 days prior to permit expiration 1,418 1,418 -
14 days or less prior to permit expiration 1,890 1,890 - 1 PL-CB-050 Commercial Cannabis - Request for Premises Modification Flat Fee 1,834 2,120 286 100% Budget Fiscal Year 2026 Page 47 of 108 Updated as of 8/3/26

Page 1162 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1 PL-CB-060 Commercial Cannabis – Transfer of Less than Majority Ownership Flat Fee 1,974 2,774 800 100% 1 PL-CB-070 Commercial Cannabis – Change in Name or Form of Business Entity Flat Fee 925 928 3 100% 1 PL-CB-080 Commercial Cannabis – Change of Premises Location Flat Fee 3,720 4,137 100% 417 1 PL-CB-090 Commercial Cannabis – Background Check Flat Fee 128 160 32 100% Plus Current Department of Justice Fee Actual Cost Actual Cost - 1 PL-CB-100 Commercial Cannabis – Employee Identification Badge Replacement Flat Fee 37 39 2 100% 1 PL-FF-010 Feather Flag Permit Per Permit 67 42 (25) 100% 1 PL-SS-010 Sidewalk Vendor Permit Per Permit 100%
Application Fee 67 42 (25)
1 PL-SS-020 Solicitor Permit Per Permit 100%
Application Fee 67 42 (25)
1 PL-SS-030 Vehicle Impound / Store / Release Per Request 100% Sidewalk Vending Receptacles, Food and Merchandise 275 284 9 1 PL-SS-040 Outdoor Sidewalk Dining Permit Per Permit 307 280 (27) 100% Plus Scanning Fee
1 PL-SS-050 Outdoor Retail Kiosk Permit Per Permit 167 130 (37) 100% Plus Scanning Fee
Fee Discount / Waiver Notes:

1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).

2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancies).

3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).

POLICE DEPARTMENT AND ANIMAL CONTROL
3 PO-010 Animal Regulation 30 - 100%
Unaltered Dog License Penalty Penalty
1 Year Per License Annually $ 100 $ 100 -$
Altered Dog License
1 Year Per License
Annually
15 15 -
2 Years Per License
Every 2 Years
25 25 -
3 Years Per License
Every 3 Years
35 35 -
Budget Fiscal Year 2026 Page 48 of 108 Updated as of 8/3/26

Page 1163 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Dog License - Income Qualified rate Per License
Annually
10 10 -
Service Dog License No Charge No Charge No Charge -
Potentially Dangerous or Vicious Dog License Per Year 150 150 - Late Registration Penalty
30-60 Days Penalty 25 25 -
Over 60 Days Penalty 50 50 -
Replacement Tag Per Tag 5 5 -
2 PO-011 Owner Requested Rabies Analysis Per Request 145 145 - 100% Plus Current Health Department Fee Current Fee Current Fee - 2 PO-012 Owner Requested Vicious Animal Pickup Per Pickup 175 175 - 100% 3 PO-013 Wild or Exotic Animal Permit Per Permit 170 170 - 100% 3 PO-014 Chicken License Per License 115 115 - 80%
3 PO-017 Pet Home Quarantine Per Quarantine 98%
Home 80 80 -
Customs 80 80 -
3 PO-019 Animal Shelter Impound and Redemption 10 - 100% Impound - 1st Occurrence Per Impound 50 50 -
Impound - 2nd Occurrence Penalty 100 100 - Penalty
Impound - 3rd and Subsequent Occurrences Penalty 150 150 - Penalty Livestock Impound Actual Cost Actual Cost Actual Cost - 3 PO-020 Administrative Animal Citation Sign-off Per Citation 40 40 - 35% Plus actual processing costs of third party vendor
3 PO-023 Animal Boarding Per Day 25 25 - 100%
Per Diem/Board of Animals
No income qualified rate
3 PO-024 Animal Adoption Processing Per Adoption 75 75 - 0 - 100% For Animals in Shelter Longer than 30 Days 45 45 -
Microchipping - Owner request Per Microchip 25 25 -
4 PO-025 Animal Trap Rental Rental Deposit
Deposit per Trap Deposit Deposit -
Plus $5 per day charged against deposit for traps not returned by the due date 5 5 - 2 PO-026 Owner Request of Animal Pickup Per request 100 100 - 67% 2 PO-027 Owner Euthanasia Request Per Animal 90 100 10 75 - 85% Owner Surrender (Includes 3 days boarding) 115 150 35
Budget Fiscal Year 2026 Page 49 of 108 Updated as of 8/3/26

Page 1164 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 PO-028 Owner Transported Deceased Animal Disposal Per Disposal 45 45 - 100% 3 PO-029 Spay/Neuter Processing Actual Cost Actual Cost Actual Cost - 100% Income Qualified 50% of Actual Cost 50% of
Actual Cost
50% of
Actual Cost
-
The State of California requires that all adopted animals be surgically sterilized prior to leaving the shelter
3 PO-031 Spay / Neuter Penalty for Impounded Animal Penalty Penalty / Set by State
1st Occurrence 35 35 -
2nd Occurrence 50 50 -
3rd and Subsequent Occurrences 100 100 -
Fees Set by State
2 PO-060 DUI Collision Response, Arrest, and Processing Actual Cost Actual Cost Actual Cost - 100% DUI Incident Documentation Per Incident 457 593 136
2 PO-080 Verification / Clearance Forms / Letters Per Letter 27 33 6 100% 2 PO-081 Vehicle Verification Service Per Request 138 177 39 100% 2 PO-082 Citation Sign-off Service Per Citation 51 64 13 100% Per Vehicle Outside Jurisdiction
2 PO-085 Vehicle Impound / Release Service Per Request 249 319 70 100% 2 PO-105 Photo Reproduction - Digital Per Copy 3 4 1 100% 2 PO-110 Police Report / Document Reproduction 100%
Per Report Page Per Page 0.25 0.25 -
Electronic Media Storage Copy Per Copy 2 2 -
Fee covered by the Public Records Act - see GS-10 General city copy charges 5 PO-120 Police False Alarm Response / Billing - Per Calendar Year Penalty Penalty Permitted Alarm
1st Response No Charge No Charge -
2nd Response No Charge No Charge -
3rd Response 80 80 -
4th Response 240 240 -
5th and Subsequent Responses 320 320 -
Non-Permitted Alarm
1st Response (waived if permit paid within 30 days) 80 80 - 2nd Response (reduced to $60 if permit paid within 30 days) 120 120 - 3rd Response 240 240 -
4th Response 320 320 -
Budget Fiscal Year 2026 Page 50 of 108 Updated as of 8/3/26

Page 1165 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
5th and Subsequent Responses 400 400 -
3 PO-125 Police Alarm Permit - new application Per Permit 100% New Application 45 45 -
3 PO-126 Police Alarm Permit Renewal Per Annual Renewal 100% Residential 25 25 -
Commercial 27 27 -
3 PO-132 Bingo Permit Per Permit 50 50 - 80%
Plus Current Department of Justice Fee Current Fee Current Fee - 3 PO-133 Entertainment Permit Per Permit 100%
New Application 337 462 125
Annual Renewal 274 395 121
Plus Current Department of Justice Fee Current Fee Current Fee - 3 PO-134 Massage Establishment Permit 70 - 100%
New Per 2-Year
Permit
562 758 196
Renewal Per Renewal 231 400 169
Plus Current Department of Justice Fee Current Fee Current Fee - Testing fee (Retest only) - 100 100
1 PO-135 Miscellaneous / Solicitor's Police Permits Per Permit 236 247 11 100% Plus Current Department of Justice Fee, if applicable Current Fee Current Fee - 1 PO-136 Firearms Dealer Permit
New Application Per Permit 353 409 56 100%
Annual Renewal Per Renewal 137 395 258
Plus Current Department of Justice Fee Current Fee Current Fee - 1 PO-137 Fortuneteller Permit Per Permit 278 202 (76) 100% Plus Current Department of Justice Fee Current Fee Current Fee - 1 PO-138 Secondhand Dealer / Pawn Shop permit Per Permit 87 169 82 100% Plus Current Department of Justice Fee Current Fee Current Fee - Budget Fiscal Year 2026 Page 51 of 108 Updated as of 8/3/26

Page 1166 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
3 PO-145 Curfew Violation Citation Citation
1st Offense 100 100 -
2nd Offense 200 200 -
3rd Offense 500 500 -
1 PO-150 Special Event Police Service Per Hour at OT Rate 194 194 - 100% 1 PO-151 Police Special Event Permit Application Per Permit 81 80 (1) 100% Non Profit Discount Per Permit - 50% discount of
permit fee
Late Application Penalty - 50 50
Carnival/Festival/Fair - Background Check Fee - Actual Cost - 2 PO-160 Police Dispatch Copy Per Copy 47 58 11 100%
Full cost includes time not eligible for recovery under PRA. Only direct copy cost can be charged.
2 PO-161 Police Recorded Media Copy Per Copy 47 58 11 100% Full cost includes time not eligible for recovery under PRA. Only direct copy cost can be charged.
2 PO-170 Auto Repossession Processing Set by State 15 15 - Set by State 3 PO-180 Special Response Team Call-Out Actual Cost Actual Cost Actual Cost - 100% 3 PO-190 Non-Consensual Tow Company Administrative Fee Per Request 1,042 1,361 319 100% Minimum 5-Year Agreement
3 PO-195 Authorized Towing Contractor Audit Actual Cost Actual Cost Actual Cost - 100% 2 PO-200 Booking Fee Actual Cost Actual Cost Actual Cost - 100% 3 PO-215 Crime Analysis Research Actual Cost Actual Cost Actual Cost - 100% 2 PO-220 Neighborhood Watch Sign Actual Cost Actual Cost Actual Cost - 100% 5 PO-225 Police Permit Per Permit
Late Penalty: 30-60 days - 50 50
Late Penalty: Over 60 days - 75 75
*For the purpose of "Income Qualified" the following must be met:

1. Be responsible for payment of the fee.

2. Have a household income of not more than the minimum amount set forth in Section 20514 of the Revenue and Taxation Code, regardless of the person's age. To obtain the income qualified rate, qualifying persons shall submit Budget Fiscal Year 2026 Page 52 of 108 Updated as of 8/3/26

Page 1167 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES

PUBLIC WORKS
2 PW-320 Traffic Study Review Flat Fee 100%
Memo $ 1,502 $ 1,815 $ 313
Site Specific 3,490 4,446 956
Regional 7,806 9,679 1,873
3 2 PW-1015 Traffic Control Plan Review Flat Fee 100%
Preliminary Review (MUTCD/WATCH) 106 143 37
Minor with Plans (Utility) 831 1,084 253
Major - TCP (1-5 sheets) 1,567 2,062 495
Major - TCP (6-20 sheets) 3,380 4,409 1,029
Major - TCP (>20 sheets) 5,944 7,663 1,719
3 PW-1016 NPDES Permit Per Inspection 100%
Stormwater Commercial Facility Inspection
(Low, Medium, & High Priority)
- 321 321
Stormwater Commercial Facility Follow-up Inspection
(Low, Medium, & High priority)
- 208 208
Stormwater Industrial Facility Inspection
(Low, Medium, & High priority)
- 411 411
Stormwater Industrial Facility Follow -up Inspection
(Low, Medium, & High priority)
- 265 265
Stormwater Construction Site Inspection
(Low, Medium, & High priority)
- 360 360
Stormwater Construction Site Follow-up Inspection
(Low, Medium, & High priority)
- 276 276
Stormwater Water Quality Management Plan
for Post-Construction BMP Inspection
- 360 360
Stormwater Water Quality Management Plan
for Post-Construction BMP Follow -up Inspection
- 225 225
Fee Discount / Waiver Notes:

1. Fees will be reduced by 50% for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080).

2. Fees will be waived for 501(C)(3) Nonprofit Organizations (See CMC §3.02.080). (FR-060 will be waived if the activity does not involve solicitation of funds. FR-070 will have the initial and first re-inspection waived for E and A3 occupancie

3. Fees will be reduced by 50% for single-family plan check and permit/inspection fees for new construction on infill residential lots within the boundary of the Downtown Specific Plan (See CMC §3.02.090).

UTILITIES DEPARTMENT
5 UD-010 Delinquent Fee 10% of Past Due
Amount
10% of Past Due
Amount
10% of Past Due
Amount
- Penalty
Budget Fiscal Year 2026 Page 53 of 108 Updated as of 8/3/26

Page 1168 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 UD-020 Disconnection Fee - Water Turn On/Turn Off Flat Fee $ 53 $ 57 $ 100% 4 Disconnection Fee - Electric Turn On/Turn Off Flat Fee 278 252 (26) 2 UD-030 New Account Set Up Fee Flat Fee 26 29 3 100%
Any Additional Meter Flat Fee 12 9 (3)
Plus Electric Turn On Flat Fee 12 13 1
5 UD-040 Final Notice Fee Penalty 34 34 - Penalty
2 UD-050 After-Hours Service Fee Flat Fee 116 114 100% (2) 2 UD-060 Damages Flat Fee 100%
Lock 18 24 6
Pull/Reinstall Meter 243 202 (41)
2 UD-070 Hydrant Meter Relocation Flat Fee 305 150 100% (155) 2 UD-080 Potable Construction Meter Deposit 3" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 3" Actual Cost Actual Cost Actual Cost - Potable Construction Water Deposit 3" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 3" Flat Fee 480 306 (174) 2 UD-090 Potable Construction Meter Deposit 4" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 4" Actual Cost Actual Cost Actual Cost - Potable Construction Water Deposit 4" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 4" Flat Fee 480 350 (130) 2 UD-100 Potable Construction Meter Deposit 6" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 6" Actual Cost Actual Cost Actual Cost - Potable Construction Water Deposit 6" Deposit Calculated Cost
Calculated
Cost -
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 6" Flat Fee 480 350 (130) 2 UD-110 Potable Construction Meter Deposit 8" Actual Cost Actual Cost Actual Cost - 100% Backflow Deposit 8" Actual Cost Actual Cost Actual Cost - Potable Construction Water Deposit 8" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + Backflow Fee + (100 units x Current Commodity Rate) Potable Construction Meter Installation and Removal Fee 8" Flat Fee 480 350 (130) Budget Fiscal Year 2026 Page 54 of 108 Updated as of 8/3/26

Page 1169 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 UD-120 Reclaimed Construction Meter Deposit 3" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 3" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + (100 units x Current Commodity Rate) Reclaimed Construction Meter Installation and Removal Fee 3" RW Flat Fee 412 421 9 2 UD-130 Reclaimed Construction Meter Deposit 4" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 4" Deposit Calculated Cost
Calculated
Cost
-
Ready to Serve Charge + (100 units x Current Commodity Rate) Reclaimed Construction Meter Installation and Removal Fee 4" RW Flat Fee 412 485 73 2 UD-140 Reclaimed Construction Meter Deposit 6" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 6" Deposit Calculated Cost
Calculated
Cost -
Ready to Serve Charge + (100 units x Current Commodity Rate) Reclaimed Construction Meter Installation and Removal Fee 6" RW Flat Fee 412 485 73 2 UD-150 Reclaimed Construction Meter Deposit 8" Actual Cost Actual Cost Actual Cost - 100% Reclaimed Construction Water Deposit 8"
Ready to Serve Charge + (100 units x Current Commodity Rate) Deposit Calculated
Cost
Calculated
Cost
-
Reclaimed Construction Meter Installation and Removal Fee 8" RW Flat Fee 412 485 73 2 UD-175 Reduce Meter Size/Relocate Meter to an Existing Service 1" or smaller Flat Fee 118 136 18 100% Reduce Meter Size/Relocate Meter to an Existing Service Over 1" 118 136 18 2 UD-190 New Water Meter Set Up and Installation Flat Fee + Actual Cost
242 230 100% (12)
Plus Cost of Meter
Water Meter Fee 5/8" Actual Cost Actual Cost -
Water Meter Fee 3/4" Actual Cost Actual Cost -
Water Meter Fee 1" Actual Cost Actual Cost -
Water Meter Fee 1 1/2" Actual Cost Actual Cost -
Water Meter Fee 2" Actual Cost Actual Cost -
Water Meter 3" & Larger Actual Cost Actual Cost -
2 UD-200 New Reclaimed Water Meter Set Up and Installation Plus Cost of Meter
Flat Fee
+ Actual Cost
242 335 100% 93
Reclaimed Water Meter Fee 5/8" Actual Cost Actual Cost - Reclaimed Water Meter Fee 3/4" Actual Cost Actual Cost - Reclaimed Water Meter Fee 1" Actual Cost Actual Cost -
Reclaimed Water Meter Fee 1 1/2" Actual Cost Actual Cost - Reclaimed Water Meter Fee 2" Actual Cost Actual Cost -
Reclaimed Water Meter Fee 3" & Larger Actual Cost Actual Cost - 2 UD-210 Pretreatment Program Application Review Flat Fee 100% Budget Fiscal Year 2026 Page 55 of 108 Updated as of 8/3/26

Page 1170 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Class 1 3,105 3,329 224
Class 2 2,144 2,289 145
Class 3 1,182 1,216 34
Class 4 1,140 1,184 44
Class 5 1,182 1,216 34
Class 6 597 631 34
2 UD-220 Pretreatment Program Annual Permit Fee
Plus Sampling & Analysis Costs
Flat Fee
+ Actual Cost
100%
Class 1 1,380 2,381 1,001
Class 2 1,380 1,536 156
Class 3 1,380 1,536 156
Class 4 1,265 1,471 206
Class 5 1,035 1,341 306
Class 6 555 496 (59)
2 UD-230 Pretreatment Program Noncompliance Inspection Flat Fee 100% Class 1 696 721 25
Class 2 696 721 25
Class 3 696 721 25
Class 4 696 721 25
Class 5 696 721 25
Class 6 696 721 25
2 UD-240 Pretreatment Program Noncompliance Sampling/Analysis Plus Sampling & Analysis Costs
Flat Fee
+ Actual Cost
1,201 949 100% (252)
2 UD-250 Pretreatment Program Grease Interceptor Monitoring Flat Fee 250 203 (47) 100% 5 UD-260 Pretreatment Program Minimum Penalties Penalty Penalty Stop Work Order 500 500 -
Compliance Order 1,000 1,000 -
Consent Order 500 500 -
Cease and Desist Order 1,000 1,000 -
Show Cause Hearing 1,500 1,500 -
2 UD-270 Lost/Stolen/Damaged Backflow Device
Plus Backflow and Materials Costs
Flat Fee
+ Actual Cost
546 468 100% (78)
2 UD-280 Refundable Deposit Deposit of 3x
Average Bill
Deposit of
3x Average Bill
Deposit of
3x Average Bill
- 100%
2 UD-285 Damages Cage - Water
Plus Actual Cost of Cage
Flat Fee
+ Actual Cost
758 591 100% (167)
2 UD-286 Lost/Stolen Chain - Water Flat Fee 264 166 (98) 100% Budget Fiscal Year 2026 Page 56 of 108 Updated as of 8/3/26

Page 1171 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 UD-290 Lost/Stolen Meter Actual Costs Actual Costs Actual Costs - 100% 2 UD-300 Meter Damages/Replacement Actual Costs Actual Costs Actual Costs - 100% 2 UD-310 Prepare Disinfection Plan Flat Fee 847 1,159 312 100% 2 UD-320 Fire Set Up Fee Flat Fee 70 79 9 100%
2 UD-330 House Laterals, Sewers - Maintenance Actual Costs Actual Cost Actual Cost - 100% 2 UD-340 Water Meter Upgrades/Downgrades Flat Fee
+ Actual Cost
704 459 100% (245)
Plus Meter Installation 122 48 (74)
Plus Actual Cost of Meter
Plus Meter box Installation: Grass/Dirt (if meter box needs replacement and is not in concrete)
427 473 46
Plus Actual Cost of Meter Box
Plus Meter Box Installation Deposit: Concrete (if meter box needs replacement and is in concrete)
Actual Cost -
Plus Actual Cost of Meter Box
2 UD-350 Electrical Building Plan Reviews Flat Fee
+ Deposit
220 243 100% 23
Plus Deposit for Actual Cost of Outside Plan Review
2 UD-360 Public Electrical Plan Processing Flat Fee
+ Deposit
2,079 2,220 100% 141
Plus Deposit for Actual Cost of Outside Plan Review
2 UD-370 Solar Review Fee Flat Fee 866 964 98 100%
Plus deposit for Initial Review (for non-net energy metering only) Plus deposit for Supplemental review, if applicable (for non-net energy $2,000
Deposit
$2,000
Deposit
-
metering only) $600
Deposit
$600
Deposit
-
2 UD-390 GIS Utility Update Flat Fee 504 587 83 100%
Per Plan Sheet and Per Utility
2 UD-410 Miscellaneous Service Deposit Deposit Deposit Deposit - 100% 2 UD-420 Meter Testing Flat Fee 142 147 5 100%
2 UD-430 Backflow Prevention Flat Fee 76 89 13 100%
($76 annual /
$6.33 month)
($89 annual /
$7.42 month)
Budget Fiscal Year 2026 Page 57 of 108 Updated as of 8/3/26

Page 1172 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
2 UD-450 Frontage Fee Reimbursement Actual Cost Actual Cost Actual Cost - 100% 2 UD-460 Temporary Power Actual Cost Actual Cost Actual Cost - 100% 2 UD-470 Unscheduled Service Fee Flat Fee - 14 14 100%
Budget Fiscal Year 2026 Page 58 of 108 Updated as of 8/3/26

Page 1173 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
A-1 Theater 1,000 s.f. I-A, I-B, II-A $ 8,479.05 9,715.20 1,236.15 $ 1,890.89 $ 2,238.00 $ 347.11 A-1 Theater 1,000 s.f., II-B, III-A, V-A 7,065.87 8,096.00 1,030.13 1,575.74 1,865.00 289.26 A-1 Theater 1,000 s.f. III-B, IV, V-B 5,652.70 6,476.80 824.10 1,260.59 1,492.00 231.41 A-1 Theater 5,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 3,781.78 4,476.00 694.22 A-1 Theater 5,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 3,151.48 3,730.00 578.52 A-1 Theater 5,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 2,521.18 2,984.00 462.82 A-1 Theater 10,000 s.f. I-A, I-B, II-A 13,741.91 15,746.40 2,004.49 6,429.02 7,610.40 1,181.38 A-1 Theater 10,000 s.f. II-B, III-A, V-A 11,451.59 13,122.00 1,670.41 5,357.52 6,342.00 984.48 A-1 Theater 10,000 s.f. III-B, IV, V-B 9,161.27 10,497.60 1,336.33 4,286.01 5,073.60 787.59 A-1 Theater 20,000 s.f. I-A, I-B, II-A 15,788.57 18,092.40 2,303.83 9,265.35 10,968.00 1,702.65 A-1 Theater 20,000 s.f. II-B, III-A, V-A 13,157.15 15,077.00 1,919.85 7,721.13 9,140.00 1,418.87 A-1 Theater 20,000 s.f. III-B, IV, V-B 10,525.72 12,061.60 1,535.88 6,176.90 7,312.00 1,135.10 A-1 Theater 50,000 s.f. I-A, I-B, II-A 20,174.29 23,118.00 2,943.71 11,156.24 13,207.20 2,050.96 A-1 Theater 50,000 s.f. II-B, III-A, V-A 16,811.91 19,265.00 2,453.09 9,296.87 11,006.00 1,709.13 A-1 Theater 50,000 s.f. III-B, IV, V-B 13,449.53 15,412.00 1,962.47 7,437.49 8,804.80 1,367.31 A-1 Theater 100,000 s.f. I-A, I-B, II-A 28,068.58 32,163.60 4,095.02 13,236.22 15,669.60 2,433.38 A-1 Theater 100,000 s.f. II-B, III-A, V-A 23,390.48 26,803.00 3,412.52 11,030.18 13,058.00 2,027.82 A-1 Theater 100,000 s.f. III-B, IV, V-B 18,712.38 21,442.40 2,730.02 8,824.14 10,446.40 1,622.26 A-2 Nightclub 1,000 s.f. I-A, I-B, II-A 7,894.29 9,045.60 1,151.31 1,512.71 1,790.40 277.69 A-2 Nightclub 1,000 s.f. II-B, III-A, V-A 6,578.57 7,538.00 959.43 1,260.59 1,492.00 231.41 A-2 Nightclub 1,000 s.f. III-B, IV, V-B 5,262.86 6,030.40 767.54 1,008.47 1,193.60 185.13 A-2 Nightclub 5,000 s.f. I-A, I-B, II-A 12,864.76 14,740.80 1,876.04 3,214.51 3,805.20 590.69 A-2 Nightclub 5,000 s.f. II-B, III-A, V-A 10,720.64 12,284.00 1,563.36 2,678.76 3,171.00 492.24 A-2 Nightclub 5,000 s.f. III-B, IV, V-B 8,576.51 9,827.20 1,250.69 2,143.01 2,536.80 393.79 A-2 Nightclub 10,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 5,672.66 6,715.20 1,042.54 A-2 Nightclub 10,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 4,727.22 5,596.00 868.78 A-2 Nightclub 10,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 3,781.78 4,476.80 695.02 A-2 Nightclub 20,000 s.f. I-A, I-B, II-A 15,788.57 18,092.40 2,303.83 7,941.73 9,400.80 1,459.07 A-2 Nightclub 20,000 s.f. II-B, III-A, V-A 13,157.15 15,077.00 1,919.85 6,618.11 7,834.00 1,215.89 A-2 Nightclub 20,000 s.f. III-B, IV, V-B 10,525.72 12,061.60 1,535.88 5,294.49 6,267.20 972.71 A-2 Nightclub 50,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 9,454.44 11,192.40 1,737.96 A-2 Nightclub 50,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 7,878.70 9,327.00 1,448.30 A-2 Nightclub 50,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 6,302.96 7,461.60 1,158.64 A-2 Nightclub 100,000 s.f. I-A, I-B, II-A 27,776.20 31,828.80 4,052.60 12,290.77 14,550.00 2,259.23 A-2 Nightclub 100,000 s.f. II-B, III-A, V-A 23,146.83 26,524.00 3,377.17 10,242.31 12,125.00 1,882.69 A-2 Nightclub 100,000 s.f. III-B, IV, V-B 18,517.46 21,219.20 2,701.74 8,193.85 9,700.00 1,506.15 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. I-A, I-B, II-A 9,648.57 11,055.60 1,407.03 1,701.80 2,013.60 311.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. II-B, III-A, V-A 8,040.48 9,213.00 1,172.52 1,418.17 1,678.00 259.83 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. III-B, IV, V-B 6,432.38 7,370.40 938.02 1,134.53 1,342.40 207.87 Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 59 of 108 Updated as of 8/3/26

Page 1174 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 3,403.60 4,028.40 624.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 2,836.33 3,357.00 520.67 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 2,269.07 2,685.60 416.53 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 6,050.84 7,162.80 1,111.96 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 5,042.37 5,969.00 926.63 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 4,033.89 4,775.20 741.31 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. I-A, I-B, II-A 17,250.48 19,767.60 2,517.12 8,509.00 10,072.80 1,563.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. II-B, III-A, V-A 14,375.40 16,473.00 2,097.60 7,090.83 8,394.00 1,303.17 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. III-B, IV, V-B 11,500.32 13,178.40 1,678.08 5,672.66 6,715.20 1,042.54 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. I-A, I-B, II-A 20,759.05 23,787.60 3,028.55 10,210.80 12,087.60 1,876.80 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. II-B, III-A, V-A 17,299.21 19,823.00 2,523.79 8,509.00 10,073.00 1,564.00 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. III-B, IV, V-B 13,839.37 15,858.40 2,019.03 6,807.20 8,058.40 1,251.20 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. I-A, I-B, II-A 23,390.48 26,803.20 3,412.72 13,236.22 15,669.60 2,433.38 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. II-B, III-A, V-A 19,492.07 22,336.00 2,843.93 11,030.18 13,058.00 2,027.82 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. III-B, IV, V-B 15,593.65 17,868.80 2,275.15 8,824.14 10,446.40 1,622.26 A-4 Arena 5,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 3,214.51 3,805.20 590.69 A-4 Arena 5,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 2,678.76 3,171.00 492.24 A-4 Arena 5,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 2,143.01 2,536.80 393.79 A-4 Arena 10,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 5,672.66 6,715.20 1,042.54 A-4 Arena 10,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 4,727.22 5,596.00 868.78 A-4 Arena 10,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 3,781.78 4,476.80 695.02 A-4 Arena 20,000 s.f. I-A, I-B, II-A 18,420.00 21,106.80 2,686.80 8,130.82 9,625.20 1,494.38 A-4 Arena 20,000 s.f. II-B, III-A, V-A 15,350.00 17,589.00 2,239.00 6,775.68 8,021.00 1,245.32 A-4 Arena 20,000 s.f. III-B, IV, V-B 12,280.00 14,071.20 1,791.20 5,420.55 6,416.80 996.25 A-4 Arena 50,000 s.f. I-A, I-B, II-A 23,390.48 26,803.20 3,412.72 9,832.62 11,640.00 1,807.38 A-4 Arena 50,000 s.f. II-B, III-A, V-A 19,492.07 22,336.00 2,843.93 8,193.85 9,700.00 1,506.15 A-4 Arena 50,000 s.f. III-B, IV, V-B 15,593.65 17,868.80 2,275.15 6,555.08 7,760.00 1,204.92 A-4 Arena 100,000 s.f. I-A, I-B, II-A 32,454.29 37,189.20 4,734.91 12,668.95 14,997.60 2,328.65 A-4 Arena 100,000 s.f. II-B, III-A, V-A 27,045.24 30,991.00 3,945.76 10,557.46 12,498.00 1,940.54 A-4 Arena 100,000 s.f. III-B, IV, V-B 21,636.19 24,792.80 3,156.61 8,445.97 9,998.40 1,552.43 A-5 Stadium 1,000 s.f. I-A, I-B, II-A 6,724.76 7,705.20 980.44 1,701.80 2,013.60 311.80 A-5 Stadium 1,000 s.f. II-B, III-A, V-A 5,603.97 6,421.00 817.03 1,418.17 1,678.00 259.83 A-5 Stadium 1,000 s.f. III-B, IV, V-B 4,483.18 5,136.80 653.62 1,134.53 1,342.40 207.87 A-5 Stadium 5,000 s.f. I-A, I-B, II-A 10,233.34 11,726.40 1,493.06 3,214.51 3,805.20 590.69 A-5 Stadium 5,000 s.f. II-B, III-A, V-A 8,527.78 9,772.00 1,244.22 2,678.76 3,171.00 492.24 A-5 Stadium 5,000 s.f. III-B, IV, V-B 6,822.22 7,817.60 995.38 2,143.01 2,536.80 393.79 A-5 Stadium 10,000 s.f. I-A, I-B, II-A 10,525.72 12,061.20 1,535.48 5,672.66 6,715.20 1,042.54 A-5 Stadium 10,000 s.f. II-B, III-A, V-A 8,771.43 10,051.00 1,279.57 4,727.22 5,596.00 868.78 A-5 Stadium 10,000 s.f. III-B, IV, V-B 7,017.14 8,040.80 1,023.66 3,781.78 4,476.80 695.02 Budget Fiscal Year 2026 Page 60 of 108 Updated as of 8/3/26

Page 1175 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
A-5 Stadium 20,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 8,130.82 9,625.20 1,494.38 A-5 Stadium 20,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 6,775.68 8,021.00 1,245.32 A-5 Stadium 20,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 5,420.55 6,416.80 996.25 A-5 Stadium 50,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 9,832.62 11,640.00 1,807.38 A-5 Stadium 50,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 8,193.85 9,700.00 1,506.15 A-5 Stadium 50,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 6,555.08 7,760.00 1,204.92 A-5 Stadium 100,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 12,858.04 15,222.00 2,363.96 A-5 Stadium 100,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 10,715.03 12,685.00 1,969.97 A-5 Stadium 100,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 8,572.03 10,148.00 1,575.97 B Office 1,000 s.f. I-A, I-B, II-A 11,402.86 13,065.60 1,662.74 2,079.98 2,461.20 381.22 B Office 1,000 s.f. II-B, III-A, V-A 9,502.38 10,888.00 1,385.62 1,733.31 2,051.00 317.69 B Office 1,000 s.f. III-B, IV, V-B 7,601.91 8,710.40 1,108.49 1,386.65 1,640.80 254.15 B Office 5,000 s.f. I-A, I-B, II-A 18,712.38 21,442.80 2,730.42 4,349.04 5,148.00 798.96 B Office 5,000 s.f. II-B, III-A, V-A 15,593.65 17,869.00 2,275.35 3,624.20 4,290.00 665.80 B Office 5,000 s.f. III-B, IV, V-B 12,474.92 14,295.20 1,820.28 2,899.36 3,432.00 532.64 B Office 10,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 7,563.55 8,953.20 1,389.65 B Office 10,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 6,302.96 7,461.00 1,158.04 B Office 10,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 5,042.37 5,968.80 926.43 B Office 20,000 s.f. I-A, I-B, II-A 23,098.10 26,468.40 3,370.30 10,778.06 12,759.60 1,981.54 B Office 20,000 s.f. II-B, III-A, V-A 19,248.42 22,057.00 2,808.58 8,981.72 10,633.00 1,651.28 B Office 20,000 s.f. III-B, IV, V-B 15,398.73 17,645.60 2,246.87 7,185.37 8,506.40 1,321.03 B Office 50,000 s.f. I-A, I-B, II-A 28,945.72 33,169.20 4,223.48 13,047.13 15,445.20 2,398.07 B Office 50,000 s.f. II-B, III-A, V-A 24,121.43 27,641.00 3,519.57 10,872.61 12,871.00 1,998.39 B Office 50,000 s.f. III-B, IV, V-B 19,297.15 22,112.80 2,815.65 8,698.08 10,296.80 1,598.72 B Office 100,000 s.f. I-A, I-B, II-A 33,916.20 38,864.40 4,948.20 16,261.64 19,250.40 2,988.76 B Office 100,000 s.f. II-B, III-A, V-A 28,263.50 32,387.00 4,123.50 13,551.36 16,042.00 2,490.64 B Office 100,000 s.f. III-B, IV, V-B 22,610.80 25,909.60 3,298.80 10,841.09 12,833.60 1,992.51 B Office 200,000 s.f. I-A, I-B, II-A 59,938.11 68,683.20 8,745.09 29,119.68 34,472.40 5,352.72 B Office 200,000 s.f. II-B, III-A, V-A 49,948.42 57,236.00 7,287.58 24,266.40 28,727.00 4,460.60 B Office 200,000 s.f. III-B, IV, V-B 39,958.74 45,788.80 5,830.06 19,413.12 22,981.60 3,568.48 B Office 500,000 s.f. I-A, I-B, II-A 68,709.54 78,734.40 10,024.86 35,737.78 42,307.20 6,569.42 B Office 500,000 s.f. II-B, III-A, V-A 57,257.95 65,612.00 8,354.05 29,781.49 35,256.00 5,474.51 B Office 500,000 s.f. III-B, IV, V-B 45,806.36 52,489.60 6,683.24 23,825.19 28,204.80 4,379.61 B Office 1,000,000 s.f. I-A, I-B, II-A 97,070.50 111,234.00 14,163.50 45,759.49 54,171.60 8,412.11 B Office 1,000,000 s.f. II-B, III-A, V-A 80,892.08 92,695.00 11,802.92 38,132.91 45,143.00 7,010.09 B Office 1,000,000 s.f. III-B, IV, V-B 64,713.66 74,156.00 9,442.34 30,506.33 36,114.40 5,608.07 B Medical Office 1,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 2,079.98 2,461.20 381.22 B Medical Office 1,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 1,733.31 2,051.00 317.69 B Medical Office 1,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 1,386.65 1,640.80 254.15 Budget Fiscal Year 2026 Page 61 of 108 Updated as of 8/3/26

Page 1176 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
B Medical Office 5,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 4,349.04 5,148.00 798.96 B Medical Office 5,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 3,624.20 4,290.00 665.80 B Medical Office 5,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 2,899.36 3,432.00 532.64 B Medical Office 10,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 7,563.55 8,953.20 1,389.65 B Medical Office 10,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 6,302.96 7,461.00 1,158.04 B Medical Office 10,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 5,042.37 5,968.80 926.43 B Medical Office 20,000 s.f. I-A, I-B, II-A 23,682.86 27,138.00 3,455.14 10,967.15 12,982.80 2,015.65 B Medical Office 20,000 s.f. II-B, III-A, V-A 19,735.72 22,615.00 2,879.28 9,139.29 10,819.00 1,679.71 B Medical Office 20,000 s.f. III-B, IV, V-B 15,788.57 18,092.00 2,303.43 7,311.43 8,655.20 1,343.77 B Medical Office 50,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 13,047.13 15,445.20 2,398.07 B Medical Office 50,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 10,872.61 12,871.00 1,998.39 B Medical Office 50,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 8,698.08 10,296.80 1,598.72 B Medical Office 100,000 s.f. I-A, I-B, II-A 42,102.87 48,246.00 6,143.13 15,694.37 18,579.60 2,885.23 B Medical Office 100,000 s.f. II-B, III-A, V-A 35,085.72 40,205.00 5,119.28 13,078.64 15,483.00 2,404.36 B Medical Office 100,000 s.f. III-B, IV, V-B 28,068.58 32,164.00 4,095.42 10,462.91 12,386.40 1,923.49 B Restaurant <50 occupants 1,000 s.f. I-A, I-B, II-A 9,940.95 11,390.40 1,449.45 3,403.60 4,028.40 624.80 B Restaurant <50 occupants 1,000 s.f. II-B, III-A, V-A 8,284.13 9,492.00 1,207.87 2,836.33 3,357.00 520.67 B Restaurant <50 occupants 1,000 s.f. III-B, IV, V-B 6,627.30 7,593.60 966.30 2,269.07 2,685.60 416.53 B Restaurant <50 occupants 2,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 3,970.86 4,700.40 729.54 B Restaurant <50 occupants 2,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 3,309.05 3,917.00 607.95 B Restaurant <50 occupants 2,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 2,647.24 3,133.60 486.36 B Restaurant <50 occupants 5,000 s.f. I-A, I-B, II-A 14,034.29 16,081.20 2,046.91 5,294.49 6,267.60 973.11 B Restaurant <50 occupants 5,000 s.f. II-B, III-A, V-A 11,695.24 13,401.00 1,705.76 4,412.07 5,223.00 810.93 B Restaurant <50 occupants 5,000 s.f. III-B, IV, V-B 9,356.19 10,720.80 1,364.61 3,529.66 4,178.40 648.74 B Restaurant <50 occupants 10,000 s.f. I-A, I-B, II-A 16,665.72 19,096.80 2,431.08 12,668.95 14,997.60 2,328.65 B Restaurant <50 occupants 10,000 s.f. II-B, III-A, V-A 13,888.10 15,914.00 2,025.90 10,557.46 12,498.00 1,940.54 B Restaurant <50 occupants 10,000 s.f. III-B, IV, V-B 11,110.48 12,731.20 1,620.72 8,445.97 9,998.40 1,552.43 E Educational 1,000 s.f. I-A, I-B, II-A 8,771.43 10,051.20 1,279.77 1,512.71 1,790.40 277.69 E Educational 1,000 s.f. II-B, III-A, V-A 7,309.53 8,376.00 1,066.47 1,260.59 1,492.00 231.41 E Educational 1,000 s.f. III-B, IV, V-B 5,847.62 6,700.80 853.18 1,008.47 1,193.60 185.13 E Educational 5,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 3,214.51 3,805.20 590.69 E Educational 5,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 2,678.76 3,171.00 492.24 E Educational 5,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 2,143.01 2,536.80 393.79 E Educational 10,000 s.f. I-A, I-B, II-A 13,741.91 15,746.40 2,004.49 5,672.66 6,715.20 1,042.54 E Educational 10,000 s.f. II-B, III-A, V-A 11,451.59 13,122.00 1,670.41 4,727.22 5,596.00 868.78 E Educational 10,000 s.f. III-B, IV, V-B 9,161.27 10,497.60 1,336.33 3,781.78 4,476.80 695.02 E Educational 20,000 s.f. I-A, I-B, II-A 16,373.34 18,762.00 2,388.66 8,130.82 9,625.20 1,494.38 E Educational 20,000 s.f. II-B, III-A, V-A 13,644.45 15,635.00 1,990.55 6,775.68 8,021.00 1,245.32 E Educational 20,000 s.f. III-B, IV, V-B 10,915.56 12,508.00 1,592.44 5,420.55 6,416.80 996.25 Budget Fiscal Year 2026 Page 62 of 108 Updated as of 8/3/26

Page 1177 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
E Educational 50,000 s.f. I-A, I-B, II-A 20,759.05 23,787.60 3,028.55 9,643.53 11,415.60 1,772.07 E Educational 50,000 s.f. II-B, III-A, V-A 17,299.21 19,823.00 2,523.79 8,036.27 9,513.00 1,476.73 E Educational 50,000 s.f. III-B, IV, V-B 13,839.37 15,858.40 2,019.03 6,429.02 7,610.40 1,181.38 E Educational 100,000 s.f. I-A, I-B, II-A 28,945.72 33,169.20 4,223.48 12,479.86 14,773.20 2,293.34 E Educational 100,000 s.f. II-B, III-A, V-A 24,121.43 27,641.00 3,519.57 10,399.88 12,311.00 1,911.12 E Educational 100,000 s.f. III-B, IV, V-B 19,297.15 22,112.80 2,815.65 8,319.91 9,848.80 1,528.89 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. I-A, I-B, II-A 7,601.91 8,710.80 1,108.89 1,512.71 1,790.40 277.69 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. II-B, III-A, V-A 6,334.92 7,259.00 924.08 1,260.59 1,492.00 231.41 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. III-B, IV, V-B 5,067.94 5,807.20 739.26 1,008.47 1,193.60 185.13 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. I-A, I-B, II-A 11,402.86 13,065.60 1,662.74 3,214.51 3,805.20 590.69 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. II-B, III-A, V-A 9,502.38 10,888.00 1,385.62 2,678.76 3,171.00 492.24 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. III-B, IV, V-B 7,601.91 8,710.40 1,108.49 2,143.01 2,536.80 393.79 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 5,672.66 6,715.20 1,042.54 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 4,727.22 5,596.00 868.78 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 3,781.78 4,476.80 695.02 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. I-A, I-B, II-A 14,034.29 16,081.20 2,046.91 6,996.29 8,282.40 1,286.11 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. II-B, III-A, V-A 11,695.24 13,401.00 1,705.76 5,830.24 6,902.00 1,071.76 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. III-B, IV, V-B 9,356.19 10,720.80 1,364.61 4,664.19 5,521.60 857.41 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. I-A, I-B, II-A 16,665.72 19,096.80 2,431.08 8,130.82 9,625.20 1,494.38 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. II-B, III-A, V-A 13,888.10 15,914.00 2,025.90 6,775.68 8,021.00 1,245.32 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. III-B, IV, V-B 11,110.48 12,731.20 1,620.72 5,420.55 6,416.80 996.25 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 10,778.06 12,759.60 1,981.54 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 8,981.72 10,633.00 1,651.28 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 7,185.37 8,506.40 1,321.03 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. I-A, I-B, II-A 5,847.62 6,700.80 853.18 4,727.22 5,595.60 868.38 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. II-B, III-A, V-A 4,873.02 5,584.00 710.98 3,939.35 4,663.00 723.65 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. III-B, IV, V-B 3,898.41 4,467.20 568.79 3,151.48 3,730.40 578.92 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. I-A, I-B, II-A 8,771.43 10,051.20 1,279.77 6,239.93 7,386.00 1,146.07 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. II-B, III-A, V-A 7,309.53 8,376.00 1,066.47 5,199.94 6,155.00 955.06 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. III-B, IV, V-B 5,847.62 6,700.80 853.18 4,159.95 4,924.00 764.05 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. I-A, I-B, II-A 9,648.57 11,055.60 1,407.03 7,941.73 9,400.80 1,459.07 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. II-B, III-A, V-A 8,040.48 9,213.00 1,172.52 6,618.11 7,834.00 1,215.89 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. III-B, IV, V-B 6,432.38 7,370.40 938.02 5,294.49 6,267.20 972.71 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. I-A, I-B, II-A 10,525.72 12,061.20 1,535.48 10,399.88 12,310.80 1,910.92 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. II-B, III-A, V-A 8,771.43 10,051.00 1,279.57 8,666.57 10,259.00 1,592.43 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. III-B, IV, V-B 7,017.14 8,040.80 1,023.66 6,933.26 8,207.20 1,273.94 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 13,425.30 15,892.80 2,467.50 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 11,187.75 13,244.00 2,056.25 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 8,950.20 10,595.20 1,645.00 Budget Fiscal Year 2026 Page 63 of 108 Updated as of 8/3/26

Page 1178 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., I-A, I-B, II-A 19,004.77 21,777.60 2,772.83 17,585.26 20,817.60 3,232.34 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., II-B, III-A, V-A 15,837.30 18,148.00 2,310.70 14,654.38 17,348.00 2,693.62 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., III-B, IV, V-B 12,669.84 14,518.40 1,848.56 11,723.51 13,878.40 2,154.89 S-2 Parking Garage 5,000 s.f. I-A, I-B, II-A 9,356.19 10,720.80 1,364.61 5,672.66 6,715.20 1,042.54 S-2 Parking Garage 5,000 s.f. II-B, III-A, V-A 7,796.83 8,934.00 1,137.17 4,727.22 5,596.00 868.78 S-2 Parking Garage 5,000 s.f. III-B, IV, V-B 6,237.46 7,147.20 909.74 3,781.78 4,476.80 695.02 S-2 Parking Garage 10,000 s.f. I-A, I-B, II-A 14,326.67 16,416.00 2,089.33 7,374.46 8,730.00 1,355.54 S-2 Parking Garage 10,000 s.f. II-B, III-A, V-A 11,938.89 13,680.00 1,741.11 6,145.39 7,275.00 1,129.61 S-2 Parking Garage 10,000 s.f. III-B, IV, V-B 9,551.11 10,944.00 1,392.89 4,916.31 5,820.00 903.69 S-2 Parking Garage 50,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 9,643.53 11,415.60 1,772.07 S-2 Parking Garage 50,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 8,036.27 9,513.00 1,476.73 S-2 Parking Garage 50,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 6,429.02 7,610.40 1,181.38 S-2 Parking Garage 100,000 s.f. I-A, I-B, II-A 23,098.10 26,468.40 3,370.30 14,370.75 17,012.40 2,641.65 S-2 Parking Garage 100,000 s.f. II-B, III-A, V-A 19,248.42 22,057.00 2,808.58 11,975.62 14,177.00 2,201.38 S-2 Parking Garage 100,000 s.f. III-B, IV, V-B 15,398.73 17,645.60 2,246.87 9,580.50 11,341.60 1,761.10 S-2 Parking Garage 500,000 s.f. I-A, I-B, II-A 28,068.58 32,163.60 4,095.02 21,556.12 25,519.20 3,963.08 S-2 Parking Garage 500,000 s.f. II-B, III-A, V-A 23,390.48 26,803.00 3,412.52 17,963.44 21,266.00 3,302.56 S-2 Parking Garage 500,000 s.f. III-B, IV, V-B 18,712.38 21,442.40 2,730.02 14,370.75 17,012.80 2,642.05 S-2 Parking Garage 1,000,000 s.f. I-A, I-B, II-A 36,840.01 42,214.80 5,374.79 43,112.25 51,038.40 7,926.15 S-2 Parking Garage 1,000,000 s.f. II-B, III-A, V-A 30,700.01 35,179.00 4,478.99 35,926.87 42,532.00 6,605.13 S-2 Parking Garage 1,000,000 s.f. III-B, IV, V-B 24,560.00 28,143.20 3,583.20 28,741.50 34,025.60 5,284.10 U Utility/Misc 500 s.f. I-A, I-B, II-A 2,923.81 3,350.40 426.59 1,701.80 2,013.60 311.80 U Utility/Misc 500 s.f. II-B, III-A, V-A 2,436.51 2,792.00 355.49 1,418.17 1,678.00 259.83 U Utility/Misc 500 s.f. III-B, IV, V-B 1,949.21 2,233.60 284.39 1,134.53 1,342.40 207.87 U Utility/Misc 2,000 s.f. I-A, I-B, II-A 4,385.72 5,025.60 639.88 2,458.15 2,910.00 451.85 U Utility/Misc 2,000 s.f. II-B, III-A, V-A 3,654.76 4,188.00 533.24 2,048.46 2,425.00 376.54 U Utility/Misc 2,000 s.f. III-B, IV, V-B 2,923.81 3,350.40 426.59 1,638.77 1,940.00 301.23 U Utility/Misc 4,000 s.f. I-A, I-B, II-A 4,970.48 5,695.20 724.72 5,105.40 6,043.20 937.80 U Utility/Misc 4,000 s.f. II-B, III-A, V-A 4,142.06 4,746.00 603.94 4,254.50 5,036.00 781.50 U Utility/Misc 4,000 s.f. III-B, IV, V-B 3,313.65 3,796.80 483.15 3,403.60 4,028.80 625.20 U Utility/Misc 8,000 s.f. I-A, I-B, II-A 5,847.62 6,700.80 853.18 6,618.11 7,834.80 1,216.69 U Utility/Misc 8,000 s.f. II-B, III-A, V-A 4,873.02 5,584.00 710.98 5,515.09 6,529.00 1,013.91 U Utility/Misc 8,000 s.f. III-B, IV, V-B 3,898.41 4,467.20 568.79 4,412.07 5,223.20 811.13 U Utility/Misc 20,000 s.f. I-A, I-B, II-A 7,309.53 8,376.00 1,066.47 8,319.91 9,848.40 1,528.49 U Utility/Misc 20,000 s.f. II-B, III-A, V-A 6,091.27 6,980.00 888.73 6,933.26 8,207.00 1,273.74 U Utility/Misc 20,000 s.f. III-B, IV, V-B 4,873.02 5,584.00 710.98 5,546.60 6,565.60 1,019.00 U Utility/Misc 40,000 s.f. I-A, I-B, II-A 11,110.48 12,730.80 1,620.32 10,021.71 11,863.20 1,841.49 U Utility/Misc 40,000 s.f. II-B, III-A, V-A 9,258.73 10,609.00 1,350.27 8,351.42 9,886.00 1,534.58 U Utility/Misc 40,000 s.f. III-B, IV, V-B 7,406.99 8,487.20 1,080.21 6,681.14 7,908.80 1,227.66 Budget Fiscal Year 2026 Page 64 of 108 Updated as of 8/3/26

Page 1179 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
U Utility/Misc (Associated w R-3 structures) 500 s.f. I-A, I-B, II-A 1,169.52 1,339.20 169.68 756.36 895.20 138.84 U Utility/Misc (Associated w R-3 structures) 500 s.f. II-B, III-A, V-A 974.60 1,116.00 141.40 630.30 746.00 115.70 U Utility/Misc (Associated w R-3 structures) 500 s.f. III-B, IV, V-B 779.68 892.80 113.12 504.24 596.80 92.56 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. I-A, I-B, II-A 1,754.29 2,010.00 255.71 1,134.53 1,342.80 208.27 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. II-B, III-A, V-A 1,461.91 1,675.00 213.09 945.44 1,119.00 173.56 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. III-B, IV, V-B 1,169.52 1,340.00 170.48 756.36 895.20 138.84 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. I-A, I-B, II-A 2,046.67 2,344.80 298.13 2,269.07 2,685.60 416.53 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. II-B, III-A, V-A 1,705.56 1,954.00 248.44 1,890.89 2,238.00 347.11 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. III-B, IV, V-B 1,364.44 1,563.20 198.76 1,512.71 1,790.40 277.69 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. I-A, I-B, II-A 2,339.05 2,679.60 340.55 3,025.42 3,580.80 555.38 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. II-B, III-A, V-A 1,949.21 2,233.00 283.79 2,521.18 2,984.00 462.82 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. III-B, IV, V-B 1,559.37 1,786.40 227.03 2,016.95 2,387.20 370.25 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. I-A, I-B, II-A 8,771.43 10,051.20 1,279.77 1,890.89 2,238.00 347.11 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. II-B, III-A, V-A 7,309.53 8,376.00 1,066.47 1,575.74 1,865.00 289.26 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. III-B, IV, V-B 5,847.62 6,700.80 853.18 1,260.59 1,492.00 231.41 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 3,781.78 4,476.00 694.22 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 3,151.48 3,730.00 578.52 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 2,521.18 2,984.00 462.82 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. I-A, I-B, II-A 13,741.91 15,746.40 2,004.49 6,239.93 7,386.00 1,146.07 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. II-B, III-A, V-A 11,451.59 13,122.00 1,670.41 5,199.94 6,155.00 955.06 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. III-B, IV, V-B 9,161.27 10,497.60 1,336.33 4,159.95 4,924.00 764.05 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. I-A, I-B, II-A 20,174.29 23,118.00 2,943.71 10,967.15 12,982.80 2,015.65 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. II-B, III-A, V-A 16,811.91 19,265.00 2,453.09 9,139.29 10,819.00 1,679.71 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. III-B, IV, V-B 13,449.53 15,412.00 1,962.47 7,311.43 8,655.20 1,343.77 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. I-A, I-B, II-A 27,483.82 31,494.00 4,010.18 14,181.66 16,788.00 2,606.34 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. II-B, III-A, V-A 22,903.18 26,245.00 3,341.82 11,818.05 13,990.00 2,171.95 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. III-B, IV, V-B 18,322.54 20,996.00 2,673.46 9,454.44 11,192.00 1,737.56 H-5 HPM, 1,000 s.f. I-A, I-B, II-A 12,864.76 14,740.80 1,876.04 1,512.71 1,790.40 277.69 H-5 HPM, 1,000 s.f. II-B, III-A, V-A 10,720.64 12,284.00 1,563.36 1,260.59 1,492.00 231.41 H-5 HPM, 1,000 s.f. III-B, IV, V-B 8,576.51 9,827.20 1,250.69 1,008.47 1,193.60 185.13 H-5 HPM, 5,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 3,214.51 3,805.20 590.69 H-5 HPM, 5,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 2,678.76 3,171.00 492.24 H-5 HPM, 5,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 2,143.01 2,536.80 393.79 H-5 HPM, 10,000 s.f. I-A, I-B, II-A 20,759.05 23,787.60 3,028.55 5,483.58 6,490.80 1,007.22 H-5 HPM, 10,000 s.f. II-B, III-A, V-A 17,299.21 19,823.00 2,523.79 4,569.65 5,409.00 839.35 H-5 HPM, 10,000 s.f. III-B, IV, V-B 13,839.37 15,858.40 2,019.03 3,655.72 4,327.20 671.48 H-5 HPM, 20,000 s.f. I-A, I-B, II-A 24,560.00 28,143.60 3,583.60 7,941.73 9,400.80 1,459.07 H-5 HPM, 20,000 s.f. II-B, III-A, V-A 20,466.67 23,453.00 2,986.33 6,618.11 7,834.00 1,215.89 H-5 HPM, 20,000 s.f. III-B, IV, V-B 16,373.34 18,762.40 2,389.06 5,294.49 6,267.20 972.71 Budget Fiscal Year 2026 Page 65 of 108 Updated as of 8/3/26

Page 1180 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
H-5 HPM, 50,000 s.f. I-A, I-B, II-A 30,700.01 35,179.20 4,479.19 9,454.44 11,192.40 1,737.96 H-5 HPM, 50,000 s.f. II-B, III-A, V-A 25,583.34 29,316.00 3,732.66 7,878.70 9,327.00 1,448.30 H-5 HPM, 50,000 s.f. III-B, IV, V-B 20,466.67 23,452.80 2,986.13 6,302.96 7,461.60 1,158.64 H-5 HPM, 100,000 s.f. I-A, I-B, II-A 43,564.77 49,921.20 6,356.43 12,290.77 14,550.00 2,259.23 H-5 HPM, 100,000 s.f. II-B, III-A, V-A 36,303.98 41,601.00 5,297.02 10,242.31 12,125.00 1,882.69 H-5 HPM, 100,000 s.f. III-B, IV, V-B 29,043.18 33,280.80 4,237.62 8,193.85 9,700.00 1,506.15 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 2,079.98 2,461.20 381.22 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 1,733.31 2,051.00 317.69 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 1,386.65 1,640.80 254.15 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 4,159.95 4,923.60 763.65 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 3,466.63 4,103.00 636.37 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 2,773.30 3,282.40 509.10 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 7,374.46 8,730.00 1,355.54 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 6,145.39 7,275.00 1,129.61 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 4,916.31 5,820.00 903.69 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. I-A, I-B, II-A 23,682.86 27,138.00 3,455.14 10,399.88 12,310.80 1,910.92 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. II-B, III-A, V-A 19,735.72 22,615.00 2,879.28 8,666.57 10,259.00 1,592.43 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. III-B, IV, V-B 15,788.57 18,092.00 2,303.43 6,933.26 8,207.20 1,273.94 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 12,479.86 14,773.20 2,293.34 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 10,399.88 12,311.00 1,911.12 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 8,319.91 9,848.80 1,528.89 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. I-A, I-B, II-A 42,102.87 48,246.00 6,143.13 16,072.55 19,027.20 2,954.65 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. II-B, III-A, V-A 35,085.72 40,205.00 5,119.28 13,393.79 15,856.00 2,462.21 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. III-B, IV, V-B 28,068.58 32,164.00 4,095.42 10,715.03 12,684.80 1,969.77 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. I-A, I-B, II-A 11,987.62 13,736.40 1,748.78 1,890.89 2,238.00 347.11 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. II-B, III-A, V-A 9,989.68 11,447.00 1,457.32 1,575.74 1,865.00 289.26 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. III-B, IV, V-B 7,991.75 9,157.60 1,165.85 1,260.59 1,492.00 231.41 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. I-A, I-B, II-A 19,004.77 21,777.60 2,772.83 3,970.86 4,700.40 729.54 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. II-B, III-A, V-A 15,837.30 18,148.00 2,310.70 3,309.05 3,917.00 607.95 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. III-B, IV, V-B 12,669.84 14,518.40 1,848.56 2,647.24 3,133.60 486.36 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. I-A, I-B, II-A 19,881.91 22,782.00 2,900.09 6,807.20 8,058.00 1,250.80 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. II-B, III-A, V-A 16,568.26 18,985.00 2,416.74 5,672.66 6,715.00 1,042.34 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. III-B, IV, V-B 13,254.61 15,188.00 1,933.39 4,538.13 5,372.00 833.87 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. I-A, I-B, II-A 23,682.86 27,138.00 3,455.14 9,832.62 11,640.00 1,807.38 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. II-B, III-A, V-A 19,735.72 22,615.00 2,879.28 8,193.85 9,700.00 1,506.15 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. III-B, IV, V-B 15,788.57 18,092.00 2,303.43 6,555.08 7,760.00 1,204.92 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 11,723.51 13,878.00 2,154.49 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 9,769.59 11,565.00 1,795.41 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 7,815.67 9,252.00 1,436.33 Budget Fiscal Year 2026 Page 66 of 108 Updated as of 8/3/26

Page 1181 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
I-4, I-2.1 Day Care/Outpatient 100,000 s.f. I-A, I-B, II-A 42,102.87 48,246.00 6,143.13 14,181.66 16,788.00 2,606.34 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. II-B, III-A, V-A 35,085.72 40,205.00 5,119.28 11,818.05 13,990.00 2,171.95 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. III-B, IV, V-B 28,068.58 32,164.00 4,095.42 9,454.44 11,192.00 1,737.56 M Mercantile 1,000 s.f. I-A, I-B, II-A 8,186.67 9,380.40 1,193.73 3,214.51 3,805.20 590.69 M Mercantile 1,000 s.f. II-B, III-A, V-A 6,822.22 7,817.00 994.78 2,678.76 3,171.00 492.24 M Mercantile 1,000 s.f. III-B, IV, V-B 5,457.78 6,253.60 795.82 2,143.01 2,536.80 393.79 M Mercantile 5,000 s.f. I-A, I-B, II-A 12,572.38 14,406.00 1,833.62 4,916.31 5,820.00 903.69 M Mercantile 5,000 s.f. II-B, III-A, V-A 10,476.99 12,005.00 1,528.01 4,096.92 4,850.00 753.08 M Mercantile 5,000 s.f. III-B, IV, V-B 8,381.59 9,604.00 1,222.41 3,277.54 3,880.00 602.46 M Mercantile 10,000 s.f. I-A, I-B, II-A 13,157.15 15,076.80 1,919.65 7,374.46 8,730.00 1,355.54 M Mercantile 10,000 s.f. II-B, III-A, V-A 10,964.29 12,564.00 1,599.71 6,145.39 7,275.00 1,129.61 M Mercantile 10,000 s.f. III-B, IV, V-B 8,771.43 10,051.20 1,279.77 4,916.31 5,820.00 903.69 M Mercantile 20,000 s.f. I-A, I-B, II-A 15,496.19 17,756.40 2,260.21 11,156.24 13,207.20 2,050.96 M Mercantile 20,000 s.f. II-B, III-A, V-A 12,913.49 14,797.00 1,883.51 9,296.87 11,006.00 1,709.13 M Mercantile 20,000 s.f. III-B, IV, V-B 10,330.80 11,837.60 1,506.80 7,437.49 8,804.80 1,367.31 M Mercantile 50,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 14,370.75 17,012.40 2,641.65 M Mercantile 50,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 11,975.62 14,177.00 2,201.38 M Mercantile 50,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 9,580.50 11,341.60 1,761.10 M Mercantile 100,000 s.f. I-A, I-B, II-A 21,928.58 25,128.00 3,199.42 18,530.70 21,937.20 3,406.50 M Mercantile 100,000 s.f. II-B, III-A, V-A 18,273.81 20,940.00 2,666.19 15,442.25 18,281.00 2,838.75 M Mercantile 100,000 s.f. III-B, IV, V-B 14,619.05 16,752.00 2,132.95 12,353.80 14,624.80 2,271.00 M Mercantile 200,000 s.f. I-A, I-B, II-A 24,560.00 28,143.60 3,583.60 24,392.46 28,876.80 4,484.34 M Mercantile 200,000 s.f. II-B, III-A, V-A 20,466.67 23,453.00 2,986.33 20,327.05 24,064.00 3,736.95 M Mercantile 200,000 s.f. III-B, IV, V-B 16,373.34 18,762.40 2,389.06 16,261.64 19,251.20 2,989.56 R-1 Apartments/Hotel Transient 1,000 s.f. I-A, I-B, II-A 10,233.34 11,726.40 1,493.06 3,592.69 4,252.80 660.11 R-1 Apartments/Hotel Transient 1,000 s.f. II-B, III-A, V-A 8,527.78 9,772.00 1,244.22 2,993.91 3,544.00 550.09 R-1 Apartments/Hotel Transient 1,000 s.f. III-B, IV, V-B 6,822.22 7,817.60 995.38 2,395.12 2,835.20 440.08 R-1 Apartments/Hotel Transient 5,000 s.f. I-A, I-B, II-A 15,788.57 18,092.40 2,303.83 6,807.20 8,058.00 1,250.80 R-1 Apartments/Hotel Transient 5,000 s.f. II-B, III-A, V-A 13,157.15 15,077.00 1,919.85 5,672.66 6,715.00 1,042.34 R-1 Apartments/Hotel Transient 5,000 s.f. III-B, IV, V-B 10,525.72 12,061.60 1,535.88 4,538.13 5,372.00 833.87 R-1 Apartments/Hotel Transient 10,000 s.f. I-A, I-B, II-A 16,373.34 18,762.00 2,388.66 11,345.33 13,430.40 2,085.07 R-1 Apartments/Hotel Transient 10,000 s.f. II-B, III-A, V-A 13,644.45 15,635.00 1,990.55 9,454.44 11,192.00 1,737.56 R-1 Apartments/Hotel Transient 10,000 s.f. III-B, IV, V-B 10,915.56 12,508.00 1,592.44 7,563.55 8,953.60 1,390.05 R-1 Apartments/Hotel Transient 20,000 s.f. I-A, I-B, II-A 19,297.15 22,112.40 2,815.25 15,883.46 18,802.80 2,919.34 R-1 Apartments/Hotel Transient 20,000 s.f. II-B, III-A, V-A 16,080.96 18,427.00 2,346.04 13,236.22 15,669.00 2,432.78 R-1 Apartments/Hotel Transient 20,000 s.f. III-B, IV, V-B 12,864.76 14,741.60 1,876.84 10,588.97 12,535.20 1,946.23 R-1 Apartments/Hotel Transient 50,000 s.f. I-A, I-B, II-A 24,267.62 27,807.60 3,539.98 19,097.97 22,608.00 3,510.03 R-1 Apartments/Hotel Transient 50,000 s.f. II-B, III-A, V-A 20,223.02 23,173.00 2,949.98 15,914.97 18,840.00 2,925.03 R-1 Apartments/Hotel Transient 50,000 s.f. III-B, IV, V-B 16,178.42 18,538.40 2,359.98 12,731.98 15,072.00 2,340.02 Budget Fiscal Year 2026 Page 67 of 108 Updated as of 8/3/26

Page 1182 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
R-1 Apartments/Hotel Transient 100,000 s.f. I-A, I-B, II-A 34,208.58 39,199.20 4,990.62 24,581.54 29,100.00 4,518.46 R-1 Apartments/Hotel Transient 100,000 s.f. II-B, III-A, V-A 28,507.15 32,666.00 4,158.85 20,484.62 24,250.00 3,765.38 R-1 Apartments/Hotel Transient 100,000 s.f. III-B, IV, V-B 22,805.72 26,132.80 3,327.08 16,387.70 19,400.00 3,012.30 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. I-A, I-B, II-A 10,233.34 11,726.40 1,493.06 3,403.60 4,028.40 624.80 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. II-B, III-A, V-A 8,527.78 9,772.00 1,244.22 2,836.33 3,357.00 520.67 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. III-B, IV, V-B 6,822.22 7,817.60 995.38 2,269.07 2,685.60 416.53 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. I-A, I-B, II-A 14,619.05 16,752.00 2,132.95 6,429.02 7,610.40 1,181.38 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. II-B, III-A, V-A 12,182.54 13,960.00 1,777.46 5,357.52 6,342.00 984.48 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. III-B, IV, V-B 9,746.03 11,168.00 1,421.97 4,286.01 5,073.60 787.59 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. I-A, I-B, II-A 14,911.43 17,086.80 2,175.37 11,345.33 13,430.40 2,085.07 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. II-B, III-A, V-A 12,426.19 14,239.00 1,812.81 9,454.44 11,192.00 1,737.56 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. III-B, IV, V-B 9,940.95 11,391.20 1,450.25 7,563.55 8,953.60 1,390.05 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 13,803.48 16,340.40 2,536.92 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 11,502.90 13,617.00 2,114.10 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 9,202.32 10,893.60 1,691.28 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 16,828.90 19,922.40 3,093.50 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 14,024.09 16,602.00 2,577.91 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 11,219.27 13,281.60 2,062.33 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. I-A, I-B, II-A 29,530.48 33,838.80 4,308.32 21,177.95 25,070.40 3,892.45 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. II-B, III-A, V-A 24,608.74 28,199.00 3,590.26 17,648.29 20,892.00 3,243.71 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. III-B, IV, V-B 19,686.99 22,559.20 2,872.21 14,118.63 16,713.60 2,594.97 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 4,727.22 5,595.60 868.38 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 3,939.35 4,663.00 723.65 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 3,151.48 3,730.40 578.92 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 6,050.84 7,162.80 1,111.96 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 5,042.37 5,969.00 926.63 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 4,033.89 4,775.20 741.31 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. I-A, I-B, II-A 18,127.62 20,772.00 2,644.38 7,941.73 9,400.80 1,459.07 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. II-B, III-A, V-A 15,106.35 17,310.00 2,203.65 6,618.11 7,834.00 1,215.89 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. III-B, IV, V-B 12,085.08 13,848.00 1,762.92 5,294.49 6,267.20 972.71 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 10,210.80 12,087.60 1,876.80 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 8,509.00 10,073.00 1,564.00 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 6,807.20 8,058.40 1,251.20 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. I-A, I-B, II-A 26,314.29 30,153.60 3,839.31 13,425.30 15,892.80 2,467.50 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. II-B, III-A, V-A 21,928.58 25,128.00 3,199.42 11,187.75 13,244.00 2,056.25 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. III-B, IV, V-B 17,542.86 20,102.40 2,559.54 8,950.20 10,595.20 1,645.00 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. I-A, I-B, II-A 35,962.86 41,210.40 5,247.54 17,396.17 20,594.40 3,198.23 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. II-B, III-A, V-A 29,969.05 34,342.00 4,372.95 14,496.81 17,162.00 2,665.19 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. III-B, IV, V-B 23,975.24 27,473.60 3,498.36 11,597.45 13,729.60 2,132.15 Budget Fiscal Year 2026 Page 68 of 108 Updated as of 8/3/26

Page 1183 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
R-3 Single Family Residential 2,000 s.f. I-A, I-B, II-A 4,093.33 4,689.60 596.27 1,323.62 1,566.00 242.38 R-3 Single Family Residential 2,000 s.f. II-B, III-A, V-A 3,411.11 3,908.00 496.89 1,103.02 1,305.00 201.98 R-3 Single Family Residential 2,000 s.f. III-B, IV, V-B 2,728.89 3,126.40 397.51 882.41 1,044.00 161.59 R-3 Single Family Residential 3,000 s.f. I-A, I-B, II-A 5,262.86 6,030.00 767.14 1,512.71 1,790.40 277.69 R-3 Single Family Residential 3,000 s.f. II-B, III-A, V-A 4,385.72 5,025.00 639.28 1,260.59 1,492.00 231.41 R-3 Single Family Residential 3,000 s.f. III-B, IV, V-B 3,508.57 4,020.00 511.43 1,008.47 1,193.60 185.13 R-3 Single Family Residential 5,000 s.f. I-A, I-B, II-A 7,601.91 8,710.80 1,108.89 2,079.98 2,461.20 381.22 R-3 Single Family Residential 5,000 s.f. II-B, III-A, V-A 6,334.92 7,259.00 924.08 1,733.31 2,051.00 317.69 R-3 Single Family Residential 5,000 s.f. III-B, IV, V-B 5,067.94 5,807.20 739.26 1,386.65 1,640.80 254.15 R-3 Single Family Residential 10,000 s.f. I-A, I-B, II-A 8,479.05 9,715.20 1,236.15 2,836.33 3,357.60 521.27 R-3 Single Family Residential 10,000 s.f. II-B, III-A, V-A 7,065.87 8,096.00 1,030.13 2,363.61 2,798.00 434.39 R-3 Single Family Residential 10,000 s.f. III-B, IV, V-B 5,652.70 6,476.80 824.10 1,890.89 2,238.40 347.51 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 2,647.24 3,133.20 485.96 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 2,206.04 2,611.00 404.96 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 1,764.83 2,088.80 323.97 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 4,159.95 4,923.60 763.65 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 3,466.63 4,103.00 636.37 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 2,773.30 3,282.40 509.10 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. I-A, I-B, II-A 18,127.62 20,772.00 2,644.38 5,672.66 6,715.20 1,042.54 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. II-B, III-A, V-A 15,106.35 17,310.00 2,203.65 4,727.22 5,596.00 868.78 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. III-B, IV, V-B 12,085.08 13,848.00 1,762.92 3,781.78 4,476.80 695.02 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 7,941.73 9,400.80 1,459.07 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 6,618.11 7,834.00 1,215.89 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 5,294.49 6,267.20 972.71 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. I-A, I-B, II-A 26,314.29 30,153.60 3,839.31 9,454.44 11,192.40 1,737.96 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. II-B, III-A, V-A 21,928.58 25,128.00 3,199.42 7,878.70 9,327.00 1,448.30 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. III-B, IV, V-B 17,542.86 20,102.40 2,559.54 6,302.96 7,461.60 1,158.64 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. I-A, I-B, II-A 35,962.86 41,210.40 5,247.54 12,290.77 14,550.00 2,259.23 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. II-B, III-A, V-A 29,969.05 34,342.00 4,372.95 10,242.31 12,125.00 1,882.69 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. III-B, IV, V-B 23,975.24 27,473.60 3,498.36 8,193.85 9,700.00 1,506.15 R-4 Residential Care/Assisted Living Facility 1,000 s.f. I-A, I-B, II-A 12,280.00 14,071.20 1,791.20 1,890.89 2,238.00 347.11 R-4 Residential Care/Assisted Living Facility 1,000 s.f. II-B, III-A, V-A 10,233.34 11,726.00 1,492.66 1,575.74 1,865.00 289.26 R-4 Residential Care/Assisted Living Facility 1,000 s.f. III-B, IV, V-B 8,186.67 9,380.80 1,194.13 1,260.59 1,492.00 231.41 R-4 Residential Care/Assisted Living Facility 5,000 s.f. I-A, I-B, II-A 17,542.86 20,102.40 2,559.54 3,403.60 4,028.40 624.80 R-4 Residential Care/Assisted Living Facility 5,000 s.f. II-B, III-A, V-A 14,619.05 16,752.00 2,132.95 2,836.33 3,357.00 520.67 R-4 Residential Care/Assisted Living Facility 5,000 s.f. III-B, IV, V-B 11,695.24 13,401.60 1,706.36 2,269.07 2,685.60 416.53 R-4 Residential Care/Assisted Living Facility 10,000 s.f. I-A, I-B, II-A 18,127.62 20,772.00 2,644.38 5,672.66 6,715.20 1,042.54 R-4 Residential Care/Assisted Living Facility 10,000 s.f. II-B, III-A, V-A 15,106.35 17,310.00 2,203.65 4,727.22 5,596.00 868.78 R-4 Residential Care/Assisted Living Facility 10,000 s.f. III-B, IV, V-B 12,085.08 13,848.00 1,762.92 3,781.78 4,476.80 695.02 Budget Fiscal Year 2026 Page 69 of 108 Updated as of 8/3/26

Page 1184 of 2528 ends

BUILDING DIVISION - Table A: New Construction
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
R-4 Residential Care/Assisted Living Facility 20,000 s.f. I-A, I-B, II-A 21,636.19 24,793.20 3,157.01 7,374.46 8,730.00 1,355.54 R-4 Residential Care/Assisted Living Facility 20,000 s.f. II-B, III-A, V-A 18,030.16 20,661.00 2,630.84 6,145.39 7,275.00 1,129.61 R-4 Residential Care/Assisted Living Facility 20,000 s.f. III-B, IV, V-B 14,424.13 16,528.80 2,104.67 4,916.31 5,820.00 903.69 R-4 Residential Care/Assisted Living Facility 50,000 s.f. I-A, I-B, II-A 26,314.29 30,153.60 3,839.31 8,887.17 10,520.40 1,633.23 R-4 Residential Care/Assisted Living Facility 50,000 s.f. II-B, III-A, V-A 21,928.58 25,128.00 3,199.42 7,405.98 8,767.00 1,361.02 R-4 Residential Care/Assisted Living Facility 50,000 s.f. III-B, IV, V-B 17,542.86 20,102.40 2,559.54 5,924.78 7,013.60 1,088.82 R-4 Residential Care/Assisted Living Facility 100,000 s.f. I-A, I-B, II-A 35,962.86 41,210.40 5,247.54 11,345.33 13,430.40 2,085.07 R-4 Residential Care/Assisted Living Facility 100,000 s.f. II-B, III-A, V-A 29,969.05 34,342.00 4,372.95 9,454.44 11,192.00 1,737.56 R-4 Residential Care/Assisted Living Facility 100,000 s.f. III-B, IV, V-B 23,975.24 27,473.60 3,498.36 7,563.55 8,953.60 1,390.05 U Detached Access. Structure 2,000 s.f. I-A, I-B, II-A 4,678.10 5,360.40 682.30 2,458.15 2,910.00 451.85 U Detached Access. Structure 2,000 s.f. II-B, III-A, V-A 3,898.41 4,467.00 568.59 2,048.46 2,425.00 376.54 U Detached Access. Structure 2,000 s.f. III-B, IV, V-B 3,118.73 3,573.60 454.87 1,638.77 1,940.00 301.23 U Detached Access. Structure 3,000 s.f. I-A, I-B, II-A 5,847.62 6,700.80 853.18 2,647.24 3,133.20 485.96 U Detached Access. Structure 3,000 s.f. II-B, III-A, V-A 4,873.02 5,584.00 710.98 2,206.04 2,611.00 404.96 U Detached Access. Structure 3,000 s.f. III-B, IV, V-B 3,898.41 4,467.20 568.79 1,764.83 2,088.80 323.97 U Detached Access. Structure 5,000 s.f. I-A, I-B, II-A 8,479.05 9,715.20 1,236.15 3,970.86 4,700.40 729.54 U Detached Access. Structure 5,000 s.f. II-B, III-A, V-A 7,065.87 8,096.00 1,030.13 3,309.05 3,917.00 607.95 U Detached Access. Structure 5,000 s.f. III-B, IV, V-B 5,652.70 6,476.80 824.10 2,647.24 3,133.60 486.36 U Detached Access. Structure 10,000 s.f. I-A, I-B, II-A 9,356.19 10,720.80 1,364.61 5,294.49 6,267.60 973.11 U Detached Access. Structure 10,000 s.f. II-B, III-A, V-A 7,796.83 8,934.00 1,137.17 4,412.07 5,223.00 810.93 U Detached Access. Structure 10,000 s.f. III-B, IV, V-B 6,237.46 7,147.20 909.74 3,529.66 4,178.40 648.74 Footnotes:

1. Shells pay 70% of the full fees.

2. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged at the hourly plan review rate.

3. Where plans are incomplete or changed so as to require additional plan checks, an additional plan check fee shall be charged at the rate established by the fee schedule and minimum hours as determined by the Building Official.

Budget Fiscal Year 2026 Page 70 of 108 Updated as of 8/3/26

Page 1185 of 2528 ends

BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 138.00 $ 164.00 $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138
If fee > $138 - Staff will charge fee
Fence - First 100 lineal feet (wood, vinyl, w.iron, etc.) 98.24 107.00 8.76 135.33 139.00 3.67 Each additional 100 lineal feet 12.07 13.00 0.93 18.04 18.00 (0.04) All masonry wall heights measured from top of footing to top of wall Masonry Wall - City Standard - First 100 lineal feet 128.41 130.00 1.59 270.65 279.00 8.35 Each additional 100 ft. 12.07 13.00 0.93 30.67 31.00 0.33 Masonry Wal l- Special Design - ≤ 6ft high - First 100 lineal feet 343.75 417.00 73.25 270.65 279.00 8.35 Each additional 100 ft. 68.92 82.00 13.08 90.22 93.00 2.78 Retaining Wall - City Standard - First 100 lineal feet 128.41 130.00 1.59 180.43 186.00 5.57 Each additional 100 ft. 24.14 25.00 0.86 90.22 93.00 2.78 Retaining Wall - Special Design -≤6 ft. high - First 100 lineal feet 343.75 417.00 73.25 270.65 279.00 8.35 Each additional 100 ft. 68.92 83.00 14.08 135.33 139.00 3.67 Retaining Wall - Special Design - over 6 ft. high per 1,000 sq. ft. 579.14 668.00 88.86 541.30 559.00 17.70 Combo - Wall per City Std 6 ft. wall over 2 ft. retaining first 100 lineal feet 128.41 129.00 0.59 225.54 233.00 7.46 Each additional 100 ft. 24.14 25.00 0.86 135.33 139.00 3.67 Combo Wall - Special Design - First 100 lineal feet 724.97 837.00 112.03 451.08 466.00 14.92 Each additional 100 linear feet 68.92 82.00 13.08 90.22 93.00 2.78 Fireplace - Masonry - Freestanding - previously approved engineered 176.53 210.00 33.47 180.43 186.00 5.57 Fireplace - Special Design - Freestanding 373.43 452.00 78.57 451.08 466.00 14.92 Residential Patio Cover - City Std - lattice first 500 sq. ft. 158.09 208.00 49.91 360.87 373.00 12.13 Each additional 500 sq ft - - - 108.26 93.00 (15.26)
Residential Patio Cover City Std - Solid roof - first 500 sq. ft 158.09 208.00 49.91 360.87 373.00 12.13 Each additional 500 sq. ft. - - - 135.33 111.00 (24.33) Residential Patio Cover Special Design - Lattice - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Plan Check Only
(with PME Included) Inspection Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 71 of 108 Updated as of 8/3/26

Page 1186 of 2528 ends

BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Each additional 500 sq ft 68.92 83.00 14.08 90.22 111.00 20.78 Residential Patio Cover Special Design - Solid roof - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 83.00 14.08 108.26 139.00 30.74 Commercial Patio Cover Special Design - Lattice - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq ft 68.92 83.00 14.08 108.26 111.00 2.74 Commercial Patio Cover Special Design - Solid roof - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 83.00 14.08 135.33 139.00 3.67 Patio Enclosure First 500 sq. ft. - ICC 153.94 299.00 145.06 270.65 279.00 8.35 Each additional 500 sq. ft. - - - 135.33 139.00 3.67
Patio Enclosure First 500 sq. ft. - Conventional/Special Design 166.67 430.00 263.33 270.65 279.00 8.35 Each additional 500 sq. ft. - - - 135.33 139.00 3.67
Balcony - City Standard - first 500 sq. ft. 218.43 270.00 51.57 360.87 373.00 12.13 Each additional 500 sq. ft. - - - 135.33 139.00 3.67
Balcony - Special Design - first 500 sq. ft. 442.35 577.00 134.65 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 82.00 13.08 90.22 93.00 2.78 Residential Garage - wood frame - first 500 sq. ft. 871.50 911.00 39.50 541.30 559.00 17.70 each additional 500 sq ft 68.92 82.00 13.08 360.87 373.00 12.13 SFR Carport - City Standard - Solid Roof - first 500 sq. ft. 246.00 303.00 57.00 360.87 373.00 12.13 Each additional 500 sq. ft. - - - 108.26 111.00 2.74
SFR Carport - Special Design - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 82.00 13.08 90.22 93.00 2.78 MFR/Comm Carport - first 500 sq. ft. 373.43 495.00 121.57 360.87 373.00 12.13 Each additional 500 sq. ft. 68.92 82.00 13.08 90.22 93.00 2.78 Storage Shed:

Wood frame first 500 sq. ft. 406.70 527.00 120.30 360.87 373.00 12.13 Each additional 500 sq. ft. (any material) 68.92 82.00 13.08 90.22 93.00 2.78 Masonry 544.53 692.00 147.47 541.30 559.00 17.70
Metal/Other 199.94 280.00 80.06 360.87 373.00 12.13
Budget Fiscal Year 2026 Page 72 of 108 Updated as of 8/3/26

Page 1187 of 2528 ends

BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Loft - Special Design - first 500 sq. ft. 494.10 619.00 124.90 541.30 559.00 17.70 Each additional 500 sq. ft. - - - 135.33 139.00 3.67
Garage Conversion - Conventional Construction - first 500 sq. ft. 406.70 615.00 208.30 721.74 746.00 24.26 Each additional 500 sq. ft. (see Note 1) - - - 135.33 139.00 3.67 -
Garage Conversion - Special Design - first 500 sq. ft. 544.53 817.00 272.47 721.74 746.00 24.26 Each additional 500 sq. ft. (see Note 2) - - - 135.33 139.00 3.67 Existing Garage Conversion into Accessory Dwelling Unit ADU 1,383.61 1,565.00 181.39 1,082.60 1,119.00 36.40 Each Additional 500 sq ft - 113.00 113.00 135.33 139.00 3.67 New Accessory Dwelling Unit ADU
Fee as a new SFD per sq. ft.

Swimming pool / Spa permit includes: slide /rock features/ 1 electrical pool panel/2 pumps/pool lights/filter/treatment systems/all piping and electrical wiring-Heaters not included-see Mechanical fee schedule (Table E)/Additional electrical panels or motors per Electrical fee schedule (Table D) Swimming Pool - Private - First 800 sq. ft. 351.74 233.00 (118.74) 902.17 932.00 29.83 Each additional 500 sq. ft. 34.46 41.00 6.54 270.65 279.00 8.35 Swimming Pool Fiberglass / Vinyl 103.73 126.00 22.27 721.74 746.00 24.26 Swimming Pool - Public - First 800 sq. ft. 829.73 994.00 164.27 902.17 932.00 29.83 Each additional 500 sq. ft. 34.46 41.00 6.54 270.65 279.00 8.35 Swimming pool grotto or additional structural/water features - each 137.84 165.00 27.16 270.65 279.00 8.35 Swimming pool misc structure or code upgrade/modifications 137.84 165.00 27.16 270.65 279.00 8.35 Ponds/Fountains 200 sq. ft. or less 137.84 164.00 26.16 360.87 373.00 12.13 Room Addition Single Family Dwelling - first 500 sq. ft. 990.38 1,126.00 135.62 902.17 932.00 29.83 Each additional 500 sq. ft. 136.65 156.00 19.35 270.65 279.00 8.35 Foundation Repair /seismic upgrade/per 200 lineal feet of foundation 275.68 330.00 54.32 270.65 279.00 8.35 Window Residential - New / Changeout / Skylights 102.19 115.00 12.81 135.33 139.00 3.67 Window Non-Residential - New / Changeout / Skylights (Each 50) 201.13 235.00 33.87 135.33 139.00 3.67 Budget Fiscal Year 2026 Page 73 of 108 Updated as of 8/3/26

Page 1188 of 2528 ends

BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Re-roof - Residential comp over 1 existing layer
First 3,000 sq. ft. 94.80 103.00 8.20 135.33 139.00 3.67 Each additional 1,500 sq. ft. 13.78 17.00 3.22 18.04 18.00 (0.04) Re-roof Residential - Special Design - Tile, etc.

First 3,000 sq. ft. 129.26 145.00 15.74 135.33 139.00 3.67 Each additional 1,500 sq. ft. 27.57 33.00 5.43 18.04 18.00 (0.04) Re-roof - Non Residential
First 50,000 sq. ft. 166.16 178.00 11.84 225.54 233.00 7.46 Each additional 50,000 sq. ft. 13.78 17.00 3.22 135.33 139.00 3.67 Storage Racks 6 ft. and Higher - Interior
First 500 lineal feet 539.90 610.00 70.10 180.43 186.00 5.57 Each additional 500 ft. 38.75 48.00 9.25 90.22 93.00 2.78 Storage Racks 6 ft and Higher - Exterior
First 500 lineal feet 720.53 833.00 112.47 180.43 186.00 5.57 Each additional 500 ft. 38.75 48.00 9.25 90.22 93.00 2.78 Cell Site / Commercial Antenna Structure - Each 887.01 1,003.00 115.99 270.65 279.00 8.35 Flag Pole - City Standard - Each 67.73 73.00 5.27 90.22 93.00 2.78 Silo - Per 5,000 Cu. Ft. Volume 858.37 998.00 139.63 360.87 373.00 12.13 Miscellaneous Plan Check - Includes 3 Plan Checks / Inspections Only Additional charges per hour begin at 4th review or inspection 1,435.09 1,668.00 232.91 541.30 559.00 17.70 Single Family Dwelling and Garage Fire Damage
Up to 30% Fire Damage Miscellaneous - includes 3 plan checks/inspections only 349.66 436.00 86.34 541.30 559.00 17.70 30%-70% Fire Damage 793.99 997.00 203.01 1,082.60 1,119.00 36.40 70%-100% Fire Damage (Fee for new single family dwelling and new garage will apply) - - - 1,353.25 1,399.00 45.75 Commercial / Industrial Canopy
First 1,000 sq. ft. 1,024.84 1,168.00 143.16 541.30 559.00 17.70 Each additional 1,000 sq. ft. 99.09 117.00 17.91 135.33 139.00 3.67 Fueling Station Canopy per 2,000 sq. ft. 1,024.84 1,168.00 143.16 541.30 559.00 17.70 Budget Fiscal Year 2026 Page 74 of 108 Updated as of 8/3/26

Page 1189 of 2528 ends

BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Sign - Non-Electrical 200 sq. ft. or less
Wall Mounted 68.92 82.00 13.08 180.43 186.00 5.57
Monument 6 ft. high or less 137.84 165.00 27.16 180.43 186.00 5.57 Pole sign 200 sq. ft. or less and 20 ft. high or less 413.51 494.00 80.49 270.65 279.00 8.35 Each additional 200 sq. ft. and/or each additional 20 ft. height 68.92 82.00 13.08 90.22 93.00 2.78 Sign - Electrical - see Electrical fees
Site Accessibility Improvements:

Per Ramp 525.87 590.00 64.13 180.43 186.00 5.57
Per Stairway 551.35 658.00 106.65 360.87 373.00 12.13
Per Accessible Parking Stall 551.35 659.00 107.65 180.43 186.00 5.57 Per Elevator / Lift 551.35 658.00 106.65 721.74 746.00 24.26 Parking lot restripe per 100 parking spaces 275.68 329.00 53.32 180.43 186.00 5.57 Demolition:

Pool Demo without Compaction Report 99.09 114.00 14.91 135.33 139.00 3.67 Pool Demo with Compaction Report 282.82 323.00 40.18 90.22 93.00 2.78 Residential Demo (Interior Only) 137.84 164.00 26.16 90.22 93.00 2.78 Residential Demo 477.93 501.00 23.07 90.22 93.00 2.78
Non-Res Demo (Interior Only) 137.84 164.00 26.16 90.22 93.00 2.78 Non-Res Demo 477.93 501.00 23.07 90.22 93.00 2.78
Demising Wall per 1,000 sq. ft. 430.70 461.00 30.30 360.87 373.00 12.13 Manufactured Home
First Section 12'x60' (720 sq. ft.) 698.32 784.00 85.68 270.65 279.00 8.35 Each additional section 68.92 82.00 13.08 45.11 46.00 0.89 Manufactured Home Foundation System
First Section 12'x60' (720 sq. ft.) 403.60 482.00 78.40 360.87 373.00 12.13 Each additional section 68.92 82.00 13.08 45.11 46.00 0.89 Commercial Coach / Manufactured Building
first Section 12'x60' (720 sq. ft.) 836.16 947.00 110.84 360.87 373.00 12.13 Each additional section 68.92 82.00 13.08 90.22 93.00 2.78 Foundation System for Commercial Coach / Manufactured Building First Section 12'x60' (720 sq. ft.) 779.34 869.00 89.66 360.87 373.00 12.13 Each additional section 68.92 82.00 13.08 45.11 46.00 0.89 Budget Fiscal Year 2026 Page 75 of 108 Updated as of 8/3/26

Page 1190 of 2528 ends

BUILDING DIVISION - Table B: Miscellaneous Fees
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Plan Check Only
(with PME Included) Inspection Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Vault
Underground 631.47 712.00 80.53 90.22 93.00 2.78
Above Ground 562.55 630.00 67.45 90.22 93.00 2.78
Bleachers per 1,000 sq. ft. 757.22 873.00 115.78 360.87 373.00 12.13 Certified Access Specialist Program (CASP) Review - Per Hour 137.84 165.00 27.16 180.43 186.00 5.57 Code Compliance Inspection - Per Hour - - - 180.43 186.00 5.57 Footnotes:

1. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged at the hourly plan review rate.

2. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.

3. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.

4. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.

Note 1: This item applies to the conversion of an existing garage into a habitable space such as: a bedroom, guest room, living room, family room, etc., but not an Accessory Dwelling Unit (ADU).

Note 2: Same as Note 1, but with Engineering.

Budget Fiscal Year 2026 Page 76 of 108 Updated as of 8/3/26

Page 1191 of 2528 ends

BUILDING DIVISION - Table C: Plumbing
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 138.00 $ 164.00 $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138
If fee > $138 - Staff will charge fee
Plumbing Fee Per Each Fixture
Water Closet(Toilet)/Bidet 18.96 21.00 2.04 18.04 18.00 (0.04) Lavatory/Sink 18.96 21.00 2.04 18.04 18.00 (0.04)
Kitchen Sink 18.96 21.00 2.04 18.04 18.00 (0.04)
Bathtub 18.96 21.00 2.04 18.04 18.00 (0.04)
Shower 18.96 21.00 2.04 18.04 18.00 (0.04)
Dishwasher 18.96 21.00 2.04 18.04 18.00 (0.04)
Laundry Tray or Mop Sink 18.96 21.00 2.04 18.04 18.00 (0.04) Urinal & Waterless Urinal 18.96 21.00 2.04 18.04 18.00 (0.04) Clothes washer 18.96 21.00 2.04 18.04 18.00 (0.04)
Floor Sink or Floor Drain 18.96 21.00 2.04 18.04 18.00 (0.04) Water Heater-storage tank 100 Gal or less 63.44 63.00 (0.44) 45.11 46.00 0.89 Water Heater-storage tank over 100 Gal 123.77 125.00 1.23 72.17 74.00 1.83 Water Heater-Gas-instantaneous 199,000 btu or less 149.91 177.00 27.09 270.65 279.00 8.35 Water Heater-Electrical instantaneous (insta hot) 18.96 21.00 2.04 18.04 18.00 (0.04) MISC fixtures Per fixture 18.96 21.00 2.04 18.04 18.00 (0.04) Each Gas Outlet 18.96 20.00 1.04 9.02 9.00 (0.02)
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 77 of 108 Updated as of 8/3/26

Page 1192 of 2528 ends

BUILDING DIVISION - Table C: Plumbing
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Hose Bibb 16.20 18.00 1.80 13.53 13.00 (0.53)
Lawn Sprinkler valve/Backflow device 16.20 17.00 0.80 5.41 5.00 (0.41) Building Sewer/Trailer park sewer-per unit 16.20 17.00 0.80 5.41 5.00 (0.41) Septic Tank/Leach field 30.17 31.00 0.83 180.43 186.00 5.57 Septic Tank Demolition 46.53 53.00 6.47 90.22 93.00 2.78 Interceptor-Grease, oil, sand etc. 287.74 342.00 54.26 180.43 186.00 5.57 Water Softener 30.17 31.00 0.83 36.09 37.00 0.91
Solar or Hydronic Systems 146.42 179.00 32.58 180.43 186.00 5.57 Water Repipe-Single Family Dwelling 120.68 124.00 3.32 270.65 279.00 8.35 Misc piping per 300 lineal ft 46.53 53.00 6.47 90.22 93.00 2.78 Medical Gas/Air outlets each 25.85 29.00 3.15 13.53 13.00 (0.53) Gray Water System 149.91 177.00 27.09 270.65 279.00 8.35 Roof Drains - per building 149.91 177.00 27.09 270.65 279.00 8.35 Commercial Reclaimed water system 149.91 177.00 27.09 270.65 279.00 8.35 Water Service 18.96 21.00 2.04 18.04 18.00 (0.04)
Pressure Regulator 18.96 20.00 1.04 9.02 9.00 (0.02)
Hot Water Recirculation System 46.53 54.00 7.47 45.11 46.00 0.89 Backflow valves 25.85 29.00 3.15 9.02 9.00 (0.02)
Sump Pump - Per Building 287.74 342.00 54.26 270.65 279.00 8.35 Sewage Ejection System/Grinder Pump - Per Site 425.58 507.00 81.42 270.65 279.00 8.35 Budget Fiscal Year 2026 Page 78 of 108 Updated as of 8/3/26

Page 1193 of 2528 ends

BUILDING DIVISION - Table C: Plumbing
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Swimming pool misc piping/retrofit/repair 46.53 54.00 7.47 45.11 46.00 0.89 Above Ground Storage Tank Install (0-660 gallons) 522.30 716.00 193.70 90.22 93.00 2.78 Above Ground Storage Tank Install (661+ gallons) 757.35 881.00 123.65 180.43 186.00 5.57 Footnotes:

1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.

2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.

3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees noted above. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.

Budget Fiscal Year 2026 Page 79 of 108 Updated as of 8/3/26

Page 1194 of 2528 ends

BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 138.00 $ 164.00 $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138
If fee > $138 - Staff will charge fee
Single Family Residential
New Service - Single Family Dwelling 225 amps or less service 287.74 342.00 54.26 541.30 559.00 17.70 (includes Circuits, Outlets, Switches, etc. no sub-panels included) Sub-Panels - Single family Single phase 225 amps or less 149.91 177.00 27.09 135.33 139.00 3.67 Service Change-Out -Single Family Single phase 90.51 93.00 2.49 270.65 279.00 8.35 Residential rewire without panel change out minimum fee up to 1,500 square feet (includes Circuits, Outlets, Switches, etc. no sub-panels included) 60.34 68.00 7.66 360.87 373.00 12.13 Residential rewire without panel change out minimum fee from 1,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc. and 1 sub-panels included) 60.34 68.00 7.66 451.08 466.00 14.92 Residential rewire with panel change out minimum fee up to 1,500 square feet (includes Circuits, Outlets, Switches, etc. no sub-panels included) 60.34 68.00 7.66 451.08 466.00 14.92 Residential rewire with panel change out minimum fee from 1,500 to 5,000 square feet (includes Circuits, Outlets, Switches, etc. and 1 sub-panels included) 60.34 68.00 7.66 541.30 559.00 17.70 New Service - Single Family Single phase Services 400 amps or less 425.58 506.00 80.42 541.30 559.00 17.70 New Service - Single Family Single phase Services 600 amps or less 425.58 506.00 80.42 541.30 559.00 17.70 New Service - Single Family Single phase Services 1200 amps or less 425.58 506.00 80.42 451.08 466.00 14.92 New Service - Single Family Single phase Services each additional 1000 amps 149.91 177.00 27.09 180.43 186.00 5.57 New Services - Commercial/Industrial and all three phase (Circuits, Outlets, Switches, etc. no sub-panels included) 225 Amps or less 287.74 341.00 53.26 360.87 373.00 12.13 400 Amps 425.58 506.00 80.42 541.30 559.00 17.70
600 Amps 563.42 671.00 107.58 721.74 746.00 24.26
800 Amps 563.42 671.00 107.58 721.74 746.00 24.26
1000 Amps 563.42 671.00 107.58 721.74 746.00 24.26
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 80 of 108 Updated as of 8/3/26

Page 1195 of 2528 ends

BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
1200 Amps 563.42 671.00 107.58 721.74 746.00 24.26
1600 Amps 563.42 671.00 107.58 721.74 746.00 24.26
each 1000 Amps over 1600 356.66 424.00 67.34 360.87 373.00 12.13 Commercial/Industrial and all three phase - "Service Only" change out (Service panel only does not include wiring new circuits) 225 Amps or less 116.05 137.00 20.95 270.65 279.00 8.35 400 Amps 149.91 177.00 27.09 360.87 373.00 12.13
600 Amps 287.74 341.00 53.26 360.87 373.00 12.13
800 Amps 287.74 341.00 53.26 360.87 373.00 12.13
1000 Amps 287.74 341.00 53.26 360.87 373.00 12.13
1200 Amps 287.74 342.00 54.26 396.95 410.00 13.05
1600 Amps 287.74 342.00 54.26 451.08 466.00 14.92
each 1000 Amps over 1600 149.91 177.00 27.09 180.43 186.00 5.57 Sub-panels, motor control panels etc.

Commercial/Industrial and all three phases
225 Amps or less 287.74 341.00 53.26 360.87 373.00 12.13 400 Amps 287.74 341.00 53.26 360.87 373.00 12.13
600 Amps 287.74 342.00 54.26 541.30 559.00 17.70
800 Amps 425.58 506.00 80.42 541.30 559.00 17.70
1000 Amps 425.58 506.00 80.42 721.74 746.00 24.26
1200 Amps 425.58 506.00 80.42 721.74 746.00 24.26
1600 Amps 425.58 506.00 80.42 721.74 746.00 24.26
each 1000 Amps over 1600 218.82 259.00 40.18 180.43 186.00 5.57 Other misc electrical Items
Transformer - each 149.91 177.00 27.09 180.43 186.00 5.57 Generator - Permanent - each 1000 amps 287.74 342.00 54.26 270.65 279.00 8.35 Generator - Temporary - more than 8 kW 30.17 31.00 0.83 45.11 46.00 0.89 Solar - Photovoltaic - Residential 15 KW or Less 305.57 368.00 62.43 180.43 187.00 6.57 Solar - Photovoltaic - Residential each additional KW above 15 KW 7.90 8.00 0.10 9.02 9.00 (0.02) Solar - Photovoltaic - Commercial 50 KW or Less 680.62 884.00 203.38 360.87 373.00 12.13 Solar - Photovoltaic - Commercial each additional KW between 51 KW and 250 KW 4.59 5.00 0.41 3.01 3.00 (0.01) Budget Fiscal Year 2026 Page 81 of 108 Updated as of 8/3/26

Page 1196 of 2528 ends

BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Solar - Photovoltaic - Commercial each additional kW above 250 KW 2.76 3.00 0.24 3.01 3.00 (0.01) Temporary Power Pole 60.34 62.00 1.66 90.22 93.00 2.78
Temporary Power Pole - additional receptacle pole - - - 36.09 37.00 0.91 Light Standard - First 5 poles 218.82 259.00 40.18 180.43 186.00 5.57 each additional 5 poles 46.53 54.00 7.47 45.11 46.00 0.89 Electrical Sign - per sign 200 sq ft or less/includes 2 sign transformers Wall mounted 200 sq ft or less 120.68 124.00 3.32 270.65 279.00 8.35 Monument 6 ft high or less and 200 sq ft or less 287.74 342.00 54.26 270.65 279.00 8.35 Pole/monument sign 200 sq ft or less and 20 ft high or less 425.58 507.00 81.42 270.65 279.00 8.35 Each additional 200 sq ft and/or each additional 20 ft height and/or each additional 2 sign transformers 46.53 54.00 7.47 135.33 139.00 3.67
Cell site Electrical per commercial panels schedule
Hazardous Locations Misc Electrical 287.74 341.00 53.26 360.87 373.00 12.13 Fuel Cell- Power Generating System-Each 200 amp ac output 630.17 695.00 64.83 360.87 373.00 12.13 Electric Vehicle Charging Station:

Commercial 148.71 223.00 74.29 90.22 93.00 2.78
Residential 114.25 127.00 12.75 90.22 93.00 2.78
EV-only Main Service Panel 46.53 53.00 6.47 90.22 93.00 2.78 Electrical Meter Reset 30.17 31.00 0.83 90.22 93.00 2.78 Misc Electrical circuits-Residential (added to existing panel) 12.07 13.00 0.93 270.65 279.00 8.35 Misc Electrical Circuits-Non Residential (added to existing panel) 287.74 342.00 54.26 270.65 279.00 8.35 Swimming pool pump motor 99.09 113.00 13.91 180.43 186.00 5.57 Footnotes:

1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.

Budget Fiscal Year 2026 Page 82 of 108 Updated as of 8/3/26

Page 1197 of 2528 ends

BUILDING DIVISION - Table D: Electrical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES

2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.

3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar photovoltaic fees noted above.

Budget Fiscal Year 2026 Page 83 of 108 Updated as of 8/3/26

Page 1198 of 2528 ends

BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Minimum Fee
Plan Check or Building Inspection $ 138.00 $ 164.00 $ 26.00 $ 138.00 $ 164.00 $ 26.00 If fee < $138 - Staff will charge $138
If fee > $138 - Staff will charge fee
A/C Unit ≤ 100,000 BTU 292.35 363.00 70.65 72.17 74.00 1.83 A/C Unit > 100,000 BTU 292.35 363.00 70.65 90.22 93.00 2.78 FAU Furnace or Heat Pump < 100,000 BTU 292.35 363.00 70.65 72.17 74.00 1.83 FAU Furnace or Heat Pump > 100,000 BTU 292.35 363.00 70.65 90.22 93.00 2.78 Refrigeration Unit 223.43 281.00 57.57 72.17 74.00 1.83 Condensors 100.47 111.00 10.53 72.17 74.00 1.83
Boilers 100,000 BTU or less 420.30 507.00 86.70 360.87 373.00 12.13 Boilers 500,000 BTU or less 420.30 507.00 86.70 360.87 373.00 12.13 Boilers 1,000,000 BTU or less 558.14 672.00 113.86 360.87 373.00 12.13 Boilers 1,750,000 BTU or less 558.14 673.00 114.86 541.30 559.00 17.70 Boilers over 1,750,000 BTU 558.14 672.00 113.86 721.74 746.00 24.26 Compressors 151.17 184.00 32.83 45.11 46.00 0.89
Evaporative Coolers - Residential 148.71 168.00 19.29 180.43 186.00 5.57 Evaporative Coolers - Commercial / Industrial 183.17 209.00 25.83 180.43 186.00 5.57 Air Handling Unit 316.58 370.00 53.42 180.43 186.00 5.57 Environmental Air Duct / Vent Fan Single Duct / Res Range Exhaust 18.96 12.00 (6.96) 9.02 9.00 (0.02) Type 1 or 2 Hood / Duct system 352.23 420.00 67.77 360.87 373.00 12.13 Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Budget Fiscal Year 2026 Page 84 of 108 Updated as of 8/3/26

Page 1199 of 2528 ends

BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Miscellaneous Duct Work 149.91 177.00 27.09 90.22 93.00 2.78 Special Equipment - Spray Booth (Exterior of Bldg) 639.23 756.00 116.77 270.65 279.00 8.35 -
Special Equipment - Spray Booth (Interior of Bldg) 458.60 587.00 128.40 270.65 279.00 8.35 Unlisted Equipment (Minimum or by the hour) 485.11 591.00 105.89 180.43 186.00 5.57 Wall Heater 149.91 177.00 27.09 180.43 186.00 5.57
Commercial Unit Heater 183.17 210.00 26.83 270.65 279.00 8.35 Cooling Tower / Chiller 703.96 841.00 137.04 541.30 559.00 17.70 Dryer Duct 22.41 25.00 2.59 13.53 13.00 (0.53)
Fueling Station Dispenser / Equipment 639.23 780.00 140.77 270.65 279.00 8.35 Underground Storage Tank (1 tank) 711.56 878.00 166.44 270.65 279.00 8.35 Underground Storage Tank (2 tanks) 767.69 950.00 182.31 270.65 279.00 8.35 Underground Storage Tank (3 tanks) 863.27 1,077.00 213.73 270.65 279.00 8.35 Underground Storage Tank (add'l tank over 3) 110.24 141.00 30.76 45.11 46.00 0.89 Above Ground Storage Tank Install (0-660 gallons) 368.99 469.00 100.01 90.22 93.00 2.78 Above Ground Storage Tank Install (661+ gallons) 563.65 713.00 149.35 180.43 186.00 5.57 Package wall unit heat / cooling ≤ 100,000 BTU 149.91 177.00 27.09 180.43 186.00 5.57 Fireplace - Listed Mechanical per unit 103.35 132.00 28.65 45.11 46.00 0.89 Decorative Gas Appliance 75.78 100.00 24.22 18.04 18.00 (0.04) Product - Conveying Duct System-Dust, Vapor, Central Vacuum system (PC based on dust collection) 544.09 657.00 112.91 270.65 279.00 8.35 Budget Fiscal Year 2026 Page 85 of 108 Updated as of 8/3/26

Page 1200 of 2528 ends

BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES
Fan - coil unit - residential 46.53 53.00 6.47 90.22 93.00 2.78 Fan - Whole House 149.91 177.00 27.09 135.33 139.00 3.67 Dust Collection System 406.25 492.00 85.75 360.87 373.00 12.13 Process piping system - 0-500 ft 287.74 341.00 53.26 360.87 373.00 12.13 Process piping system - 501-1,000 ft 287.74 342.00 54.26 541.30 559.00 17.70 Process piping system - 1,000+ ft 701.26 835.00 133.74 1,082.60 1,119.00 36.40 Solar or Hydronic systems 240.00 288.00 48.00 90.22 93.00 2.78 Swimming Pool Solar System 206.73 256.00 49.27 90.22 93.00 2.78 Thermal Energy Storage System - Residential 10 kWth or less 299.76 414.00 114.24 180.43 186.00 5.57 Thermal Energy Storage System - Residential ea adtl. kWth above 10 kWth 8.17 9.00 0.83 3.15 3.00 (0.15) Residential FAU Change out (Same Location) 80.99 95.00 14.01 135.33 139.00 3.67 Residential A/C Condensor Change Out 80.99 94.00 13.01 90.22 93.00 2.78 Combo: Residential FAU and/or A/C Condensor Change Out (Same Location) 80.99 95.00 14.01 180.43 186.00 5.57 Non-Residential FAU Change out (Same Location) 80.99 95.00 14.01 180.43 186.00 5.57 Non-Residential A/C Condensor Change Out 80.99 95.00 14.01 180.43 186.00 5.57 Swimming Pool Heater 44.11 51.00 6.89 180.43 186.00 5.57 Industrial Ovens 425.58 507.00 81.42 270.65 279.00 8.35 Footnotes:

1. The above schedule covers most common and straight forward permit types. Fees for projects outside of the listed items shall be estimated by the Building Official based on degree of complexity and size.

2. Where no fee is specified or there is an unusual circumstance, that fee shall be determined by the Building Official.

Budget Fiscal Year 2026 Page 86 of 108 Updated as of 8/3/26

Page 1201 of 2528 ends

BUILDING DIVISION - Table E: Mechanical
Service
Name
Current
Fee
Recommended
Fee
Dollar
Change
Current
Fee
Recommended
Fee
Dollar
Change
Inspection Only Plan Check Only
(with PME Included)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET-BASED FEES

3. For projects involving buildings or structures that are installed specifically for solar energy applications, fees will be charged based upon the type and/or size of the underlying building or structure in addition to the solar energy fees noted above. * Where plans are incomplete or changed so as to require additional plan checking, an additional plan check fee shall be charged at the rate established by the Fee schedule and the minimum hours as determined by the Building Official.

Budget Fiscal Year 2026 Page 87 of 108 Updated as of 8/3/26

Page 1202 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
A-1 Theater 1,000 s.f. I-A, I-B, II-A $ 2,543.71 $ 567.27 $ 2,914.56 $ 671.40 $ 474.98 $ 4,239.52 $ 945.44 $ 4,857.60 $ 1,119.00 $ 791.63 A-1 Theater 1,000 s.f. II-B, III-A, V-A 2,119.76 472.72 2,428.80 559.50 395.82 3,532.94 787.87 4,048.00 932.50 659.69 A-1 Theater 1,000 s.f. III-B, IV, V-B 1,695.81 378.18 1,943.04 447.60 316.65 2,826.35 630.30 3,238.40 746.00 527.75 A-1 Theater 5,000 s.f. I-A, I-B, II-A 3,947.14 1,134.53 4,523.04 1,342.80 784.16 6,578.57 1,890.89 7,538.40 2,238.00 1,306.94 A-1 Theater 5,000 s.f. II-B, III-A, V-A 3,289.29 945.44 3,769.20 1,119.00 653.47 5,482.14 1,575.74 6,282.00 1,865.00 1,089.12 A-1 Theater 5,000 s.f. III-B, IV, V-B 2,631.43 756.36 3,015.36 895.20 522.78 4,385.72 1,260.59 5,025.60 1,492.00 871.29 A-1 Theater 10,000 s.f. I-A, I-B, II-A 4,122.57 1,928.71 4,723.92 2,283.12 955.76 6,870.95 3,214.51 7,873.20 3,805.20 1,592.94 A-1 Theater 10,000 s.f. II-B, III-A, V-A 3,435.48 1,607.25 3,936.60 1,902.60 796.47 5,725.79 2,678.76 6,561.00 3,171.00 1,327.45 A-1 Theater 10,000 s.f. III-B, IV, V-B 2,748.38 1,285.80 3,149.28 1,522.08 637.17 4,580.64 2,143.01 5,248.80 2,536.80 1,061.96 A-1 Theater 20,000 s.f. I-A, I-B, II-A 4,736.57 2,779.61 5,427.72 3,290.40 1,201.94 7,894.29 4,632.68 9,046.20 5,484.00 2,003.24 A-1 Theater 20,000 s.f. II-B, III-A, V-A 3,947.14 2,316.34 4,523.10 2,742.00 1,001.62 6,578.57 3,860.56 7,538.50 4,570.00 1,669.36 A-1 Theater 20,000 s.f. III-B, IV, V-B 3,157.71 1,853.07 3,618.48 2,193.60 801.29 5,262.86 3,088.45 6,030.80 3,656.00 1,335.49 A-1 Theater 50,000 s.f. I-A, I-B, II-A 6,052.29 3,346.87 6,935.40 3,962.16 1,498.40 10,087.14 5,578.12 11,559.00 6,603.60 2,497.34 A-1 Theater 50,000 s.f. II-B, III-A, V-A 5,043.57 2,789.06 5,779.50 3,301.80 1,248.67 8,405.95 4,648.43 9,632.50 5,503.00 2,081.11 A-1 Theater 50,000 s.f. III-B, IV, V-B 4,034.86 2,231.25 4,623.60 2,641.44 998.93 6,724.76 3,718.75 7,706.00 4,402.40 1,664.89 A-1 Theater 100,000 s.f. I-A, I-B, II-A 8,420.57 3,970.86 9,649.08 4,700.88 1,958.52 14,034.29 6,618.11 16,081.80 7,834.80 3,264.20 A-1 Theater 100,000 s.f. II-B, III-A, V-A 7,017.14 3,309.05 8,040.90 3,917.40 1,632.10 11,695.24 5,515.09 13,401.50 6,529.00 2,720.17 A-1 Theater 100,000 s.f. III-B, IV, V-B 5,613.72 2,647.24 6,432.72 3,133.92 1,305.68 9,356.19 4,412.07 10,721.20 5,223.20 2,176.14 A-2 Nightclub 1,000 s.f. I-A, I-B, II-A 2,368.29 453.81 2,713.68 537.12 428.70 3,947.14 756.36 4,522.80 895.20 714.50 A-2 Nightclub 1,000 s.f. II-B, III-A, V-A 1,973.57 378.18 2,261.40 447.60 357.25 3,289.29 630.30 3,769.00 746.00 595.42 A-2 Nightclub 1,000 s.f. III-B, IV, V-B 1,578.86 302.54 1,809.12 358.08 285.80 2,631.43 504.24 3,015.20 596.80 476.33 A-2 Nightclub 5,000 s.f. I-A, I-B, II-A 3,859.43 964.35 4,422.24 1,141.56 740.02 6,432.38 1,607.25 7,370.40 1,902.60 1,233.36 A-2 Nightclub 5,000 s.f. II-B, III-A, V-A 3,216.19 803.63 3,685.20 951.30 616.68 5,360.32 1,339.38 6,142.00 1,585.50 1,027.80 A-2 Nightclub 5,000 s.f. III-B, IV, V-B 2,572.95 642.90 2,948.16 761.04 493.35 4,288.25 1,071.50 4,913.60 1,268.40 822.24 A-2 Nightclub 10,000 s.f. I-A, I-B, II-A 3,947.14 1,701.80 4,523.04 2,014.56 888.66 6,578.57 2,836.33 7,538.40 3,357.60 1,481.10 A-2 Nightclub 10,000 s.f. II-B, III-A, V-A 3,289.29 1,418.17 3,769.20 1,678.80 740.55 5,482.14 2,363.61 6,282.00 2,798.00 1,234.25 A-2 Nightclub 10,000 s.f. III-B, IV, V-B 2,631.43 1,134.53 3,015.36 1,343.04 592.44 4,385.72 1,890.89 5,025.60 2,238.40 987.40 A-2 Nightclub 20,000 s.f. I-A, I-B, II-A 4,736.57 2,382.52 5,427.72 2,820.24 1,128.87 7,894.29 3,970.86 9,046.20 4,700.40 1,881.45 A-2 Nightclub 20,000 s.f. II-B, III-A, V-A 3,947.14 1,985.43 4,523.10 2,350.20 940.72 6,578.57 3,309.05 7,538.50 3,917.00 1,567.87 A-2 Nightclub 20,000 s.f. III-B, IV, V-B 3,157.71 1,588.35 3,618.48 1,880.16 752.58 5,262.86 2,647.24 6,030.80 3,133.60 1,254.30 A-2 Nightclub 50,000 s.f. I-A, I-B, II-A 5,964.57 2,836.33 6,834.60 3,357.72 1,391.42 9,940.95 4,727.22 11,391.00 5,596.20 2,319.03 A-2 Nightclub 50,000 s.f. II-B, III-A, V-A 4,970.48 2,363.61 5,695.50 2,798.10 1,159.51 8,284.13 3,939.35 9,492.50 4,663.50 1,932.52 A-2 Nightclub 50,000 s.f. III-B, IV, V-B 3,976.38 1,890.89 4,556.40 2,238.48 927.61 6,627.30 3,151.48 7,594.00 3,730.80 1,546.02 A-2 Nightclub 100,000 s.f. I-A, I-B, II-A 8,332.86 3,687.23 9,548.64 4,365.00 1,893.55 13,888.10 6,145.39 15,914.40 7,275.00 3,155.92 A-2 Nightclub 100,000 s.f. II-B, III-A, V-A 6,944.05 3,072.69 7,957.20 3,637.50 1,577.96 11,573.42 5,121.15 13,262.00 6,062.50 2,629.93 A-2 Nightclub 100,000 s.f. III-B, IV, V-B 5,555.24 2,458.15 6,365.76 2,910.00 1,262.37 9,258.73 4,096.92 10,609.60 4,850.00 2,103.94 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. I-A, I-B, II-A 2,894.57 510.54 3,316.68 604.08 515.65 4,824.29 850.90 5,527.80 1,006.80 859.41 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. II-B, III-A, V-A 2,412.14 425.45 2,763.90 503.40 429.71 4,020.24 709.08 4,606.50 839.00 716.18 A-3 General Assembly, Comm. Hall, Library, Museum, Church 1,000 s.f. III-B, IV, V-B 1,929.71 340.36 2,211.12 402.72 343.77 3,216.19 567.27 3,685.20 671.20 572.94 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. I-A, I-B, II-A 4,473.43 1,021.08 5,126.04 1,208.52 840.05 7,455.72 1,701.80 8,543.40 2,014.20 1,400.09 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. II-B, III-A, V-A 3,727.86 850.90 4,271.70 1,007.10 700.04 6,213.10 1,418.17 7,119.50 1,678.50 1,166.74 A-3 General Assembly, Comm. Hall, Library, Museum, Church 5,000 s.f. III-B, IV, V-B 2,982.29 680.72 3,417.36 805.68 560.03 4,970.48 1,134.53 5,695.60 1,342.80 933.39 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. I-A, I-B, II-A 4,648.86 1,815.25 5,326.92 2,148.84 1,011.65 7,748.10 3,025.42 8,878.20 3,581.40 1,686.08 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. II-B, III-A, V-A 3,874.05 1,512.71 4,439.10 1,790.70 843.04 6,456.75 2,521.18 7,398.50 2,984.50 1,405.07 A-3 General Assembly, Comm. Hall, Library, Museum, Church 10,000 s.f. III-B, IV, V-B 3,099.24 1,210.17 3,551.28 1,432.56 674.43 5,165.40 2,016.95 5,918.80 2,387.60 1,124.05 30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
Budget Fiscal Year 2026 Page 88 of 108 Updated as of 8/3/26

Page 1203 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. I-A, I-B, II-A 5,175.14 2,552.70 5,930.28 3,021.84 1,224.28 8,625.24 4,254.50 9,883.80 5,036.40 2,040.46 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. II-B, III-A, V-A 4,312.62 2,127.25 4,941.90 2,518.20 1,020.23 7,187.70 3,545.41 8,236.50 4,197.00 1,700.39 A-3 General Assembly, Comm. Hall, Library, Museum, Church 20,000 s.f. III-B, IV, V-B 3,450.10 1,701.80 3,953.52 2,014.56 816.18 5,750.16 2,836.33 6,589.20 3,357.60 1,360.31 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. I-A, I-B, II-A 6,227.72 3,063.24 7,136.28 3,626.28 1,471.61 10,379.53 5,105.40 11,893.80 6,043.80 2,452.68 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. II-B, III-A, V-A 5,189.76 2,552.70 5,946.90 3,021.90 1,226.34 8,649.60 4,254.50 9,911.50 5,036.50 2,043.90 A-3 General Assembly, Comm. Hall, Library, Museum, Church 50,000 s.f. III-B, IV, V-B 4,151.81 2,042.16 4,757.52 2,417.52 981.07 6,919.68 3,403.60 7,929.20 4,029.20 1,635.12 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. I-A, I-B, II-A 7,017.14 3,970.86 8,040.96 4,700.88 1,753.83 11,695.24 6,618.11 13,401.60 7,834.80 2,923.05 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. II-B, III-A, V-A 5,847.62 3,309.05 6,700.80 3,917.40 1,461.53 9,746.03 5,515.09 11,168.00 6,529.00 2,435.88 A-3 General Assembly, Comm. Hall, Library, Museum, Church 100,000 s.f. III-B, IV, V-B 4,678.10 2,647.24 5,360.64 3,133.92 1,169.22 7,796.83 4,412.07 8,934.40 5,223.20 1,948.70 A-4 Arena 5,000 s.f. I-A, I-B, II-A 4,473.43 964.35 5,126.04 1,141.56 829.82 7,455.72 1,607.25 8,543.40 1,902.60 1,383.03 A-4 Arena 5,000 s.f. II-B, III-A, V-A 3,727.86 803.63 4,271.70 951.30 691.51 6,213.10 1,339.38 7,119.50 1,585.50 1,152.52 A-4 Arena 5,000 s.f. III-B, IV, V-B 2,982.29 642.90 3,417.36 761.04 553.21 4,970.48 1,071.50 5,695.60 1,268.40 922.02 A-4 Arena 10,000 s.f. I-A, I-B, II-A 4,648.86 1,701.80 5,326.92 2,014.56 990.82 7,748.10 2,836.33 8,878.20 3,357.60 1,651.37 A-4 Arena 10,000 s.f. II-B, III-A, V-A 3,874.05 1,418.17 4,439.10 1,678.80 825.69 6,456.75 2,363.61 7,398.50 2,798.00 1,376.14 A-4 Arena 10,000 s.f. III-B, IV, V-B 3,099.24 1,134.53 3,551.28 1,343.04 660.55 5,165.40 1,890.89 5,918.80 2,238.40 1,100.91 A-4 Arena 20,000 s.f. I-A, I-B, II-A 5,526.00 2,439.25 6,332.04 2,887.56 1,254.35 9,210.00 4,065.41 10,553.40 4,812.60 2,090.59 A-4 Arena 20,000 s.f. II-B, III-A, V-A 4,605.00 2,032.70 5,276.70 2,406.30 1,045.29 7,675.00 3,387.84 8,794.50 4,010.50 1,742.16 A-4 Arena 20,000 s.f. III-B, IV, V-B 3,684.00 1,626.16 4,221.36 1,925.04 836.24 6,140.00 2,710.27 7,035.60 3,208.40 1,393.73 A-4 Arena 50,000 s.f. I-A, I-B, II-A 7,017.14 2,949.79 8,040.96 3,492.00 1,566.03 11,695.24 4,916.31 13,401.60 5,820.00 2,610.05 A-4 Arena 50,000 s.f. II-B, III-A, V-A 5,847.62 2,458.15 6,700.80 2,910.00 1,305.03 9,746.03 4,096.92 11,168.00 4,850.00 2,175.04 A-4 Arena 50,000 s.f. III-B, IV, V-B 4,678.10 1,966.52 5,360.64 2,328.00 1,044.02 7,796.83 3,277.54 8,934.40 3,880.00 1,740.03 A-4 Arena 100,000 s.f. I-A, I-B, II-A 9,736.29 3,800.68 11,156.76 4,499.28 2,119.07 16,227.15 6,334.47 18,594.60 7,498.80 3,531.78 A-4 Arena 100,000 s.f. II-B, III-A, V-A 8,113.57 3,167.24 9,297.30 3,749.40 1,765.89 13,522.62 5,278.73 15,495.50 6,249.00 2,943.15 A-4 Arena 100,000 s.f. III-B, IV, V-B 6,490.86 2,533.79 7,437.84 2,999.52 1,412.71 10,818.10 4,222.98 12,396.40 4,999.20 2,354.52 A-5 Stadium 1,000 s.f. I-A, I-B, II-A 2,017.43 510.54 2,311.56 604.08 387.67 3,362.38 850.90 3,852.60 1,006.80 646.12 A-5 Stadium 1,000 s.f. II-B, III-A, V-A 1,681.19 425.45 1,926.30 503.40 323.06 2,801.98 709.08 3,210.50 839.00 538.43 A-5 Stadium 1,000 s.f. III-B, IV, V-B 1,344.95 340.36 1,541.04 402.72 258.45 2,241.59 567.27 2,568.40 671.20 430.75 A-5 Stadium 5,000 s.f. I-A, I-B, II-A 3,070.00 964.35 3,517.92 1,141.56 625.13 5,116.67 1,607.25 5,863.20 1,902.60 1,041.88 A-5 Stadium 5,000 s.f. II-B, III-A, V-A 2,558.33 803.63 2,931.60 951.30 520.94 4,263.89 1,339.38 4,886.00 1,585.50 868.23 A-5 Stadium 5,000 s.f. III-B, IV, V-B 2,046.67 642.90 2,345.28 761.04 416.75 3,411.11 1,071.50 3,908.80 1,268.40 694.59 A-5 Stadium 10,000 s.f. I-A, I-B, II-A 3,157.71 1,701.80 3,618.36 2,014.56 773.41 5,262.86 2,836.33 6,030.60 3,357.60 1,289.01 A-5 Stadium 10,000 s.f. II-B, III-A, V-A 2,631.43 1,418.17 3,015.30 1,678.80 644.50 4,385.72 2,363.61 5,025.50 2,798.00 1,074.17 A-5 Stadium 10,000 s.f. III-B, IV, V-B 2,105.14 1,134.53 2,412.24 1,343.04 515.60 3,508.57 1,890.89 4,020.40 2,238.40 859.34 A-5 Stadium 20,000 s.f. I-A, I-B, II-A 3,684.00 2,439.25 4,221.36 2,887.56 985.67 6,140.00 4,065.41 7,035.60 4,812.60 1,642.79 A-5 Stadium 20,000 s.f. II-B, III-A, V-A 3,070.00 2,032.70 3,517.80 2,406.30 821.39 5,116.67 3,387.84 5,863.00 4,010.50 1,368.99 A-5 Stadium 20,000 s.f. III-B, IV, V-B 2,456.00 1,626.16 2,814.24 1,925.04 657.12 4,093.33 2,710.27 4,690.40 3,208.40 1,095.19 A-5 Stadium 50,000 s.f. I-A, I-B, II-A 4,648.86 2,949.79 5,326.92 3,492.00 1,220.28 7,748.10 4,916.31 8,878.20 5,820.00 2,033.79 A-5 Stadium 50,000 s.f. II-B, III-A, V-A 3,874.05 2,458.15 4,439.10 2,910.00 1,016.90 6,456.75 4,096.92 7,398.50 4,850.00 1,694.83 A-5 Stadium 50,000 s.f. III-B, IV, V-B 3,099.24 1,966.52 3,551.28 2,328.00 813.52 5,165.40 3,277.54 5,918.80 3,880.00 1,355.86 A-5 Stadium 100,000 s.f. I-A, I-B, II-A 5,262.86 3,857.41 6,030.72 4,566.60 1,477.05 8,771.43 6,429.02 10,051.20 7,611.00 2,461.75 A-5 Stadium 100,000 s.f. II-B, III-A, V-A 4,385.72 3,214.51 5,025.60 3,805.50 1,230.88 7,309.53 5,357.52 8,376.00 6,342.50 2,051.46 A-5 Stadium 100,000 s.f. III-B, IV, V-B 3,508.57 2,571.61 4,020.48 3,044.40 984.70 5,847.62 4,286.01 6,700.80 5,074.00 1,641.17 B Office 1,000 s.f. I-A, I-B, II-A 3,420.86 623.99 3,919.68 738.36 613.19 5,701.43 1,039.99 6,532.80 1,230.60 1,021.98 B Office 1,000 s.f. II-B, III-A, V-A 2,850.71 519.99 3,266.40 615.30 510.99 4,751.19 866.66 5,444.00 1,025.50 851.65 B Office 1,000 s.f. III-B, IV, V-B 2,280.57 416.00 2,613.12 492.24 408.79 3,800.95 693.33 4,355.20 820.40 681.32 Budget Fiscal Year 2026 Page 89 of 108 Updated as of 8/3/26

Page 1204 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
B Office 5,000 s.f. I-A, I-B, II-A 5,613.72 1,304.71 6,432.84 1,544.40 1,058.81 9,356.19 2,174.52 10,721.40 2,574.00 1,764.69 B Office 5,000 s.f. II-B, III-A, V-A 4,678.10 1,087.26 5,360.70 1,287.00 882.34 7,796.83 1,812.10 8,934.50 2,145.00 1,470.57 B Office 5,000 s.f. III-B, IV, V-B 3,742.48 869.81 4,288.56 1,029.60 705.87 6,237.46 1,449.68 7,147.60 1,716.00 1,176.46 B Office 10,000 s.f. I-A, I-B, II-A 5,789.14 2,269.07 6,633.72 2,685.96 1,261.47 9,648.57 3,781.78 11,056.20 4,476.60 2,102.45 B Office 10,000 s.f. II-B, III-A, V-A 4,824.29 1,890.89 5,528.10 2,238.30 1,051.23 8,040.48 3,151.48 9,213.50 3,730.50 1,752.04 B Office 10,000 s.f. III-B, IV, V-B 3,859.43 1,512.71 4,422.48 1,790.64 840.98 6,432.38 2,521.18 7,370.80 2,984.40 1,401.63 B Office 20,000 s.f. I-A, I-B, II-A 6,929.43 3,233.42 7,940.52 3,827.88 1,605.55 11,549.05 5,389.03 13,234.20 6,379.80 2,675.92 B Office 20,000 s.f. II-B, III-A, V-A 5,774.52 2,694.52 6,617.10 3,189.90 1,337.96 9,624.21 4,490.86 11,028.50 5,316.50 2,229.93 B Office 20,000 s.f. III-B, IV, V-B 4,619.62 2,155.61 5,293.68 2,551.92 1,070.37 7,699.37 3,592.69 8,822.80 4,253.20 1,783.95 B Office 50,000 s.f. I-A, I-B, II-A 8,683.72 3,914.14 9,950.76 4,633.56 1,986.47 14,472.86 6,523.56 16,584.60 7,722.60 3,310.78 B Office 50,000 s.f. II-B, III-A, V-A 7,236.43 3,261.78 8,292.30 3,861.30 1,655.39 12,060.72 5,436.30 13,820.50 6,435.50 2,758.98 B Office 50,000 s.f. III-B, IV, V-B 5,789.14 2,609.43 6,633.84 3,089.04 1,324.31 9,648.57 4,349.04 11,056.40 5,148.40 2,207.18 B Office 10,000 s.f. I-A, I-B, II-A 10,174.86 4,878.49 11,659.32 5,775.12 2,381.09 16,958.10 8,130.82 19,432.20 9,625.20 3,968.48 B Office 10,000 s.f. II-B, III-A, V-A 8,479.05 4,065.41 9,716.10 4,812.60 1,984.24 14,131.75 6,775.68 16,193.50 8,021.00 3,307.07 B Office 10,000 s.f. III-B, IV, V-B 6,783.24 3,252.33 7,772.88 3,850.08 1,587.39 11,305.40 5,420.55 12,954.80 6,416.80 2,645.66 B Office 200,000 s.f. I-A, I-B, II-A 17,981.43 8,735.90 20,604.96 10,341.72 4,229.35 29,969.05 14,559.84 34,341.60 17,236.20 7,048.91 B Office 200,000 s.f. II-B, III-A, V-A 14,984.53 7,279.92 17,170.80 8,618.10 3,524.45 24,974.21 12,133.20 28,618.00 14,363.50 5,874.09 B Office 200,000 s.f. III-B, IV, V-B 11,987.62 5,823.94 13,736.64 6,894.48 2,819.56 19,979.37 9,706.56 22,894.40 11,490.80 4,699.27 B Office 500,000 s.f. I-A, I-B, II-A 20,612.86 10,721.33 23,620.32 12,692.16 4,978.28 34,354.77 17,868.89 39,367.20 21,153.60 8,297.14 B Office 500,000 s.f. II-B, III-A, V-A 17,177.38 8,934.45 19,683.60 10,576.80 4,148.57 28,628.97 14,890.74 32,806.00 17,628.00 6,914.28 B Office 500,000 s.f. III-B, IV, V-B 13,741.91 7,147.56 15,746.88 8,461.44 3,318.86 22,903.18 11,912.59 26,244.80 14,102.40 5,531.43 B Office 1,000,000 s.f. I-A, I-B, II-A 29,121.15 13,727.85 33,370.20 16,251.48 6,772.68 48,535.25 22,879.74 55,617.00 27,085.80 11,287.81 B Office 1,000,000 s.f. II-B, III-A, V-A 24,267.62 11,439.87 27,808.50 13,542.90 5,643.90 40,446.04 19,066.45 46,347.50 22,571.50 9,406.51 B Office 1,000,000 s.f. III-B, IV, V-B 19,414.10 9,151.90 22,246.80 10,834.32 4,515.12 32,356.83 15,253.16 37,078.00 18,057.20 7,525.20 B Medical Office 1,000 s.f. I-A, I-B, II-A 3,596.29 623.99 4,120.92 738.36 639.00 5,993.81 1,039.99 6,868.20 1,230.60 1,065.00 B Medical Office 1,000 s.f. II-B, III-A, V-A 2,996.91 519.99 3,434.10 615.30 532.50 4,994.84 866.66 5,723.50 1,025.50 887.50 B Medical Office 1,000 s.f. III-B, IV, V-B 2,397.52 416.00 2,747.28 492.24 426.00 3,995.87 693.33 4,578.80 820.40 710.00 B Medical Office 5,000 s.f. I-A, I-B, II-A 5,789.14 1,304.71 6,633.72 1,544.40 1,084.26 9,648.57 2,174.52 11,056.20 2,574.00 1,807.11 B Medical Office 5,000 s.f. II-B, III-A, V-A 4,824.29 1,087.26 5,528.10 1,287.00 903.55 8,040.48 1,812.10 9,213.50 2,145.00 1,505.92 B Medical Office 5,000 s.f. III-B, IV, V-B 3,859.43 869.81 4,422.48 1,029.60 722.84 6,432.38 1,449.68 7,370.80 1,716.00 1,204.74 B Medical Office 10,000 s.f. I-A, I-B, II-A 5,964.57 2,269.07 6,834.60 2,685.96 1,286.92 9,940.95 3,781.78 11,391.00 4,476.60 2,144.87 B Medical Office 10,000 s.f. II-B, III-A, V-A 4,970.48 1,890.89 5,695.50 2,238.30 1,072.43 8,284.13 3,151.48 9,492.50 3,730.50 1,787.39 B Medical Office 10,000 s.f. III-B, IV, V-B 3,976.38 1,512.71 4,556.40 1,790.64 857.95 6,627.30 2,521.18 7,594.00 2,984.40 1,429.91 B Medical Office 20,000 s.f. I-A, I-B, II-A 7,104.86 3,290.15 8,141.40 3,894.84 1,641.24 11,841.43 5,483.58 13,569.00 6,491.40 2,735.39 B Medical Office 20,000 s.f. II-B, III-A, V-A 5,920.72 2,741.79 6,784.50 3,245.70 1,367.70 9,867.86 4,569.65 11,307.50 5,409.50 2,279.49 B Medical Office 20,000 s.f. III-B, IV, V-B 4,736.57 2,193.43 5,427.60 2,596.56 1,094.16 7,894.29 3,655.72 9,046.00 4,327.60 1,823.60 B Medical Office 50,000 s.f. I-A, I-B, II-A 8,859.14 3,914.14 10,151.64 4,633.56 2,011.92 14,765.24 6,523.56 16,919.40 7,722.60 3,353.20 B Medical Office 50,000 s.f. II-B, III-A, V-A 7,382.62 3,261.78 8,459.70 3,861.30 1,676.60 12,304.37 5,436.30 14,099.50 6,435.50 2,794.33 B Medical Office 50,000 s.f. III-B, IV, V-B 5,906.10 2,609.43 6,767.76 3,089.04 1,341.28 9,843.49 4,349.04 11,279.60 5,148.40 2,235.46 B Medical Office 100,000 s.f. I-A, I-B, II-A 12,630.86 4,708.31 14,473.80 5,573.88 2,708.51 21,051.43 7,847.19 24,123.00 9,289.80 4,514.18 B Medical Office 100,000 s.f. II-B, III-A, V-A 10,525.72 3,923.59 12,061.50 4,644.90 2,257.09 17,542.86 6,539.32 20,102.50 7,741.50 3,761.82 B Medical Office 100,000 s.f. III-B, IV, V-B 8,420.57 3,138.87 9,649.20 3,715.92 1,805.67 14,034.29 5,231.46 16,082.00 6,193.20 3,009.45 B Restaurant <50 occupants 1,000 s.f. I-A, I-B, II-A 2,982.29 1,021.08 3,417.12 1,208.52 622.27 4,970.48 1,701.80 5,695.20 2,014.20 1,037.12 B Restaurant <50 occupants 1,000 s.f. II-B, III-A, V-A 2,485.24 850.90 2,847.60 1,007.10 518.56 4,142.06 1,418.17 4,746.00 1,678.50 864.27 B Restaurant <50 occupants 1,000 s.f. III-B, IV, V-B 1,988.19 680.72 2,278.08 805.68 414.85 3,313.65 1,134.53 3,796.80 1,342.80 691.42 Budget Fiscal Year 2026 Page 90 of 108 Updated as of 8/3/26

Page 1205 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
B Restaurant <50 occupants 2,000 s.f. I-A, I-B, II-A 3,684.00 1,191.26 4,221.36 1,410.12 756.22 6,140.00 1,985.43 7,035.60 2,350.20 1,260.37 B Restaurant <50 occupants 2,000 s.f. II-B, III-A, V-A 3,070.00 992.72 3,517.80 1,175.10 630.18 5,116.67 1,654.53 5,863.00 1,958.50 1,050.31 B Restaurant <50 occupants 2,000 s.f. III-B, IV, V-B 2,456.00 794.17 2,814.24 940.08 504.15 4,093.33 1,323.62 4,690.40 1,566.80 840.24 B Restaurant <50 occupants 5,000 s.f. I-A, I-B, II-A 4,210.29 1,588.35 4,824.36 1,880.28 906.01 7,017.14 2,647.24 8,040.60 3,133.80 1,510.01 B Restaurant <50 occupants 5,000 s.f. II-B, III-A, V-A 3,508.57 1,323.62 4,020.30 1,566.90 755.01 5,847.62 2,206.04 6,700.50 2,611.50 1,258.34 B Restaurant <50 occupants 5,000 s.f. III-B, IV, V-B 2,806.86 1,058.90 3,216.24 1,253.52 604.01 4,678.10 1,764.83 5,360.40 2,089.20 1,006.68 B Restaurant <50 occupants 10,000 s.f. I-A, I-B, II-A 4,999.72 3,800.68 5,729.04 4,499.28 1,427.92 8,332.86 6,334.47 9,548.40 7,498.80 2,379.87 B Restaurant <50 occupants 10,000 s.f. II-B, III-A, V-A 4,166.43 3,167.24 4,774.20 3,749.40 1,189.93 6,944.05 5,278.73 7,957.00 6,249.00 1,983.22 B Restaurant <50 occupants 10,000 s.f. III-B, IV, V-B 3,333.14 2,533.79 3,819.36 2,999.52 951.95 5,555.24 4,222.98 6,365.60 4,999.20 1,586.58 E Educational 1,000 s.f. I-A, I-B, II-A 2,631.43 453.81 3,015.36 537.12 467.24 4,385.72 756.36 5,025.60 895.20 778.73 E Educational 1,000 s.f. II-B, III-A, V-A 2,192.86 378.18 2,512.80 447.60 389.36 3,654.76 630.30 4,188.00 746.00 648.94 E Educational 1,000 s.f. III-B, IV, V-B 1,754.29 302.54 2,010.24 358.08 311.49 2,923.81 504.24 3,350.40 596.80 519.15 E Educational 5,000 s.f. I-A, I-B, II-A 3,947.14 964.35 4,523.04 1,141.56 753.10 6,578.57 1,607.25 7,538.40 1,902.60 1,255.17 E Educational 5,000 s.f. II-B, III-A, V-A 3,289.29 803.63 3,769.20 951.30 627.59 5,482.14 1,339.38 6,282.00 1,585.50 1,045.98 E Educational 5,000 s.f. III-B, IV, V-B 2,631.43 642.90 3,015.36 761.04 502.07 4,385.72 1,071.50 5,025.60 1,268.40 836.78 E Educational 10,000 s.f. I-A, I-B, II-A 4,122.57 1,701.80 4,723.92 2,014.56 914.11 6,870.95 2,836.33 7,873.20 3,357.60 1,523.51 E Educational 10,000 s.f. II-B, III-A, V-A 3,435.48 1,418.17 3,936.60 1,678.80 761.76 5,725.79 2,363.61 6,561.00 2,798.00 1,269.60 E Educational 10,000 s.f. III-B, IV, V-B 2,748.38 1,134.53 3,149.28 1,343.04 609.41 4,580.64 1,890.89 5,248.80 2,238.40 1,015.68 E Educational 20,000 s.f. I-A, I-B, II-A 4,912.00 2,439.25 5,628.60 2,887.56 1,164.91 8,186.67 4,065.41 9,381.00 4,812.60 1,941.52 E Educational 20,000 s.f. II-B, III-A, V-A 4,093.33 2,032.70 4,690.50 2,406.30 970.76 6,822.22 3,387.84 7,817.50 4,010.50 1,617.94 E Educational 20,000 s.f. III-B, IV, V-B 3,274.67 1,626.16 3,752.40 1,925.04 776.61 5,457.78 2,710.27 6,254.00 3,208.40 1,294.35 E Educational 50,000 s.f. I-A, I-B, II-A 6,227.72 2,893.06 7,136.28 3,424.68 1,440.19 10,379.53 4,821.76 11,893.80 5,707.80 2,400.31 E Educational 50,000 s.f. II-B, III-A, V-A 5,189.76 2,410.88 5,946.90 2,853.90 1,200.15 8,649.60 4,018.14 9,911.50 4,756.50 2,000.26 E Educational 50,000 s.f. III-B, IV, V-B 4,151.81 1,928.71 4,757.52 2,283.12 960.12 6,919.68 3,214.51 7,929.20 3,805.20 1,600.21 E Educational 100,000 s.f. I-A, I-B, II-A 8,683.72 3,743.96 9,950.76 4,431.96 1,955.05 14,472.86 6,239.93 16,584.60 7,386.60 3,258.41 E Educational 100,000 s.f. II-B, III-A, V-A 7,236.43 3,119.97 8,292.30 3,693.30 1,629.20 12,060.72 5,199.94 13,820.50 6,155.50 2,715.34 E Educational 100,000 s.f. III-B, IV, V-B 5,789.14 2,495.97 6,633.84 2,954.64 1,303.36 9,648.57 4,159.95 11,056.40 4,924.40 2,172.27 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. I-A, I-B, II-A 2,280.57 453.81 2,613.24 537.12 415.97 3,800.95 756.36 4,355.40 895.20 693.29 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. II-B, III-A, V-A 1,900.48 378.18 2,177.70 447.60 346.65 3,167.46 630.30 3,629.50 746.00 577.74 F-1, F-2 Industrial, Moderate/Low Hazard 1,000 s.f. III-B, IV, V-B 1,520.38 302.54 1,742.16 358.08 277.32 2,533.97 504.24 2,903.60 596.80 462.19 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. I-A, I-B, II-A 3,420.86 964.35 3,919.68 1,141.56 676.03 5,701.43 1,607.25 6,532.80 1,902.60 1,126.72 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. II-B, III-A, V-A 2,850.71 803.63 3,266.40 951.30 563.36 4,751.19 1,339.38 5,444.00 1,585.50 938.93 F-1, F-2 Industrial, Moderate/Low Hazard 5,000 s.f. III-B, IV, V-B 2,280.57 642.90 2,613.12 761.04 450.69 3,800.95 1,071.50 4,355.20 1,268.40 751.14 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. I-A, I-B, II-A 3,596.29 1,701.80 4,120.92 2,014.56 837.39 5,993.81 2,836.33 6,868.20 3,357.60 1,395.66 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. II-B, III-A, V-A 2,996.91 1,418.17 3,434.10 1,678.80 697.83 4,994.84 2,363.61 5,723.50 2,798.00 1,163.05 F-1, F-2 Industrial, Moderate/Low Hazard 15,000 s.f. III-B, IV, V-B 2,397.52 1,134.53 2,747.28 1,343.04 558.26 3,995.87 1,890.89 4,578.80 2,238.40 930.44 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. I-A, I-B, II-A 4,210.29 2,098.89 4,824.36 2,484.72 999.91 7,017.14 3,498.14 8,040.60 4,141.20 1,666.51 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. II-B, III-A, V-A 3,508.57 1,749.07 4,020.30 2,070.60 833.26 5,847.62 2,915.12 6,700.50 3,451.00 1,388.76 F-1, F-2 Industrial, Moderate/Low Hazard 20,000 s.f. III-B, IV, V-B 2,806.86 1,399.26 3,216.24 1,656.48 666.61 4,678.10 2,332.10 5,360.40 2,760.80 1,111.01 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. I-A, I-B, II-A 4,999.72 2,439.25 5,729.04 2,887.56 1,177.64 8,332.86 4,065.41 9,548.40 4,812.60 1,962.73 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. II-B, III-A, V-A 4,166.43 2,032.70 4,774.20 2,406.30 981.37 6,944.05 3,387.84 7,957.00 4,010.50 1,635.61 F-1, F-2 Industrial, Moderate/Low Hazard 50,000 s.f. III-B, IV, V-B 3,333.14 1,626.16 3,819.36 1,925.04 785.09 5,555.24 2,710.27 6,365.60 3,208.40 1,308.49 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. I-A, I-B, II-A 5,262.86 3,233.42 6,030.72 3,827.88 1,362.32 8,771.43 5,389.03 10,051.20 6,379.80 2,270.54 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. II-B, III-A, V-A 4,385.72 2,694.52 5,025.60 3,189.90 1,135.27 7,309.53 4,490.86 8,376.00 5,316.50 1,892.12 F-1, F-2 Industrial, Moderate/Low Hazard 100,000 s.f. III-B, IV, V-B 3,508.57 2,155.61 4,020.48 2,551.92 908.22 5,847.62 3,592.69 6,700.80 4,253.20 1,513.69 Budget Fiscal Year 2026 Page 91 of 108 Updated as of 8/3/26

Page 1206 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. I-A, I-B, II-A 1,754.29 1,418.17 2,010.24 1,678.68 516.47 2,923.81 2,363.61 3,350.40 2,797.80 860.78 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. II-B, III-A, V-A 1,461.91 1,181.80 1,675.20 1,398.90 430.39 2,436.51 1,969.67 2,792.00 2,331.50 717.32 S-1, S-2 Low/Mod Hazard Storage 1,000 s.f. III-B, IV, V-B 1,169.52 945.44 1,340.16 1,119.12 344.31 1,949.21 1,575.74 2,233.60 1,865.20 573.85 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. I-A, I-B, II-A 2,631.43 1,871.98 3,015.36 2,215.80 727.75 4,385.72 3,119.97 5,025.60 3,693.00 1,212.92 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. II-B, III-A, V-A 2,192.86 1,559.98 2,512.80 1,846.50 606.46 3,654.76 2,599.97 4,188.00 3,077.50 1,010.77 S-1, S-2 Low/Mod Hazard Storage 5,000 s.f. III-B, IV, V-B 1,754.29 1,247.99 2,010.24 1,477.20 485.17 2,923.81 2,079.98 3,350.40 2,462.00 808.61 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. I-A, I-B, II-A 2,894.57 2,382.52 3,316.68 2,820.24 859.83 4,824.29 3,970.86 5,527.80 4,700.40 1,433.05 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. II-B, III-A, V-A 2,412.14 1,985.43 2,763.90 2,350.20 716.52 4,020.24 3,309.05 4,606.50 3,917.00 1,194.21 S-1, S-2 Low/Mod Hazard Storage 10,000 s.f. III-B, IV, V-B 1,929.71 1,588.35 2,211.12 1,880.16 573.22 3,216.19 2,647.24 3,685.20 3,133.60 955.37 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. I-A, I-B, II-A 3,157.71 3,119.97 3,618.36 3,693.24 1,033.92 5,262.86 5,199.94 6,030.60 6,155.40 1,723.20 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. II-B, III-A, V-A 2,631.43 2,599.97 3,015.30 3,077.70 861.60 4,385.72 4,333.28 5,025.50 5,129.50 1,436.00 S-1, S-2 Low/Mod Hazard Storage 20,000 s.f. III-B, IV, V-B 2,105.14 2,079.98 2,412.24 2,462.16 689.28 3,508.57 3,466.63 4,020.40 4,103.60 1,148.80 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. I-A, I-B, II-A 3,947.14 4,027.59 4,523.04 4,767.84 1,316.14 6,578.57 6,712.65 7,538.40 7,946.40 2,193.57 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. II-B, III-A, V-A 3,289.29 3,356.33 3,769.20 3,973.20 1,096.79 5,482.14 5,593.88 6,282.00 6,622.00 1,827.98 S-1, S-2 Low/Mod Hazard Storage 50,000 s.f. III-B, IV, V-B 2,631.43 2,685.06 3,015.36 3,178.56 877.43 4,385.72 4,475.10 5,025.60 5,297.60 1,462.38 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., I-A, I-B, II-A 5,701.43 5,275.58 6,533.28 6,245.28 1,801.55 9,502.38 8,792.63 10,888.80 10,408.80 3,002.59 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., II-B, III-A, V-A 4,751.19 4,396.31 5,444.40 5,204.40 1,501.29 7,918.65 7,327.19 9,074.00 8,674.00 2,502.16 S-1, S-2 Low/Mod Hazard Storage 100,000 s.f., III-B, IV, V-B 3,800.95 3,517.05 4,355.52 4,163.52 1,201.04 6,334.92 5,861.75 7,259.20 6,939.20 2,001.73 S-2 Parking Garage 5,000 s.f. I-A, I-B, II-A 2,806.86 1,701.80 3,216.24 2,014.56 722.14 4,678.10 2,836.33 5,360.40 3,357.60 1,203.57 S-2 Parking Garage 5,000 s.f. II-B, III-A, V-A 2,339.05 1,418.17 2,680.20 1,678.80 601.79 3,898.41 2,363.61 4,467.00 2,798.00 1,002.98 S-2 Parking Garage 5,000 s.f. III-B, IV, V-B 1,871.24 1,134.53 2,144.16 1,343.04 481.43 3,118.73 1,890.89 3,573.60 2,238.40 802.38 S-2 Parking Garage 10,000 s.f. I-A, I-B, II-A 4,298.00 2,212.34 4,924.80 2,619.00 1,033.46 7,163.33 3,687.23 8,208.00 4,365.00 1,722.43 S-2 Parking Garage 10,000 s.f. II-B, III-A, V-A 3,581.67 1,843.62 4,104.00 2,182.50 861.22 5,969.45 3,072.69 6,840.00 3,637.50 1,435.36 S-2 Parking Garage 10,000 s.f. III-B, IV, V-B 2,865.33 1,474.89 3,283.20 1,746.00 688.97 4,775.56 2,458.15 5,472.00 2,910.00 1,148.29 S-2 Parking Garage 50,000 s.f. I-A, I-B, II-A 4,473.43 2,893.06 5,126.04 3,424.68 1,184.23 7,455.72 4,821.76 8,543.40 5,707.80 1,973.72 S-2 Parking Garage 50,000 s.f. II-B, III-A, V-A 3,727.86 2,410.88 4,271.70 2,853.90 986.86 6,213.10 4,018.14 7,119.50 4,756.50 1,644.77 S-2 Parking Garage 50,000 s.f. III-B, IV, V-B 2,982.29 1,928.71 3,417.36 2,283.12 789.49 4,970.48 3,214.51 5,695.60 3,805.20 1,315.81 S-2 Parking Garage 100,000 s.f. I-A, I-B, II-A 6,929.43 4,311.22 7,940.52 5,103.72 1,803.59 11,549.05 7,185.37 13,234.20 8,506.20 3,005.98 S-2 Parking Garage 100,000 s.f. II-B, III-A, V-A 5,774.52 3,592.69 6,617.10 4,253.10 1,502.99 9,624.21 5,987.81 11,028.50 7,088.50 2,504.98 S-2 Parking Garage 100,000 s.f. III-B, IV, V-B 4,619.62 2,874.15 5,293.68 3,402.48 1,202.39 7,699.37 4,790.25 8,822.80 5,670.80 2,003.98 S-2 Parking Garage 500,000 s.f. I-A, I-B, II-A 8,420.57 6,466.84 9,649.08 7,655.76 2,417.43 14,034.29 10,778.06 16,081.80 12,759.60 4,029.05 S-2 Parking Garage 500,000 s.f. II-B, III-A, V-A 7,017.14 5,389.03 8,040.90 6,379.80 2,014.52 11,695.24 8,981.72 13,401.50 10,633.00 3,357.54 S-2 Parking Garage 500,000 s.f. III-B, IV, V-B 5,613.72 4,311.22 6,432.72 5,103.84 1,611.62 9,356.19 7,185.37 10,721.20 8,506.40 2,686.03 S-2 Parking Garage 1,000,000 s.f. I-A, I-B, II-A 11,052.00 12,933.67 12,664.44 15,311.52 3,990.28 18,420.00 21,556.12 21,107.40 25,519.20 6,650.47 S-2 Parking Garage 1,000,000 s.f. II-B, III-A, V-A 9,210.00 10,778.06 10,553.70 12,759.60 3,325.24 15,350.00 17,963.44 17,589.50 21,266.00 5,542.06 S-2 Parking Garage 1,000,000 s.f. III-B, IV, V-B 7,368.00 8,622.45 8,442.96 10,207.68 2,660.19 12,280.00 14,370.75 14,071.60 17,012.80 4,433.65 U Utility/Misc 500 s.f. I-A, I-B, II-A 877.14 510.54 1,005.12 604.08 221.52 1,461.91 850.90 1,675.20 1,006.80 369.20 U Utility/Misc 500 s.f. II-B, III-A, V-A 730.95 425.45 837.60 503.40 184.60 1,218.25 709.08 1,396.00 839.00 307.66 U Utility/Misc 500 s.f. III-B, IV, V-B 584.76 340.36 670.08 402.72 147.68 974.60 567.27 1,116.80 671.20 246.13 U Utility/Misc 2,000 s.f. I-A, I-B, II-A 1,315.71 737.45 1,507.68 873.00 327.52 2,192.86 1,229.08 2,512.80 1,455.00 545.87 U Utility/Misc 2,000 s.f. II-B, III-A, V-A 1,096.43 614.54 1,256.40 727.50 272.93 1,827.38 1,024.23 2,094.00 1,212.50 454.89 U Utility/Misc 2,000 s.f. III-B, IV, V-B 877.14 491.63 1,005.12 582.00 218.35 1,461.91 819.38 1,675.20 970.00 363.91 U Utility/Misc 4,000 s.f. I-A, I-B, II-A 1,491.14 1,531.62 1,708.56 1,812.96 498.76 2,485.24 2,552.70 2,847.60 3,021.60 831.26 U Utility/Misc 4,000 s.f. II-B, III-A, V-A 1,242.62 1,276.35 1,423.80 1,510.80 415.63 2,071.03 2,127.25 2,373.00 2,518.00 692.72 U Utility/Misc 4,000 s.f. III-B, IV, V-B 994.10 1,021.08 1,139.04 1,208.64 332.51 1,656.83 1,701.80 1,898.40 2,014.40 554.18 Budget Fiscal Year 2026 Page 92 of 108 Updated as of 8/3/26

Page 1207 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
U Utility/Misc 8,000 s.f. I-A, I-B, II-A 1,754.29 1,985.43 2,010.24 2,350.44 620.96 2,923.81 3,309.05 3,350.40 3,917.40 1,034.94 U Utility/Misc 8,000 s.f. II-B, III-A, V-A 1,461.91 1,654.53 1,675.20 1,958.70 517.47 2,436.51 2,757.54 2,792.00 3,264.50 862.45 U Utility/Misc 8,000 s.f. III-B, IV, V-B 1,169.52 1,323.62 1,340.16 1,566.96 413.97 1,949.21 2,206.04 2,233.60 2,611.60 689.96 U Utility/Misc 20,000 s.f. I-A, I-B, II-A 2,192.86 2,495.97 2,512.80 2,954.52 778.49 3,654.76 4,159.95 4,188.00 4,924.20 1,297.48 U Utility/Misc 20,000 s.f. II-B, III-A, V-A 1,827.38 2,079.98 2,094.00 2,462.10 648.74 3,045.64 3,466.63 3,490.00 4,103.50 1,081.24 U Utility/Misc 20,000 s.f. III-B, IV, V-B 1,461.91 1,663.98 1,675.20 1,969.68 518.99 2,436.51 2,773.30 2,792.00 3,282.80 864.99 U Utility/Misc 40,000 s.f. I-A, I-B, II-A 3,333.14 3,006.51 3,819.24 3,558.96 1,038.54 5,555.24 5,010.85 6,365.40 5,931.60 1,730.91 U Utility/Misc 40,000 s.f. II-B, III-A, V-A 2,777.62 2,505.43 3,182.70 2,965.80 865.45 4,629.37 4,175.71 5,304.50 4,943.00 1,442.42 U Utility/Misc 40,000 s.f. III-B, IV, V-B 2,222.10 2,004.34 2,546.16 2,372.64 692.36 3,703.49 3,340.57 4,243.60 3,954.40 1,153.94 U Utility/Misc (Associated w R-3 structures) 500 s.f. I-A, I-B, II-A 350.86 226.91 401.76 268.56 92.56 584.76 378.18 669.60 447.60 154.26 U Utility/Misc (Associated w R-3 structures) 500 s.f. II-B, III-A, V-A 292.38 189.09 334.80 223.80 77.13 487.30 315.15 558.00 373.00 128.55 U Utility/Misc (Associated w R-3 structures) 500 s.f. III-B, IV, V-B 233.90 151.27 267.84 179.04 61.70 389.84 252.12 446.40 298.40 102.84 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. I-A, I-B, II-A 526.29 340.36 603.00 402.84 139.19 877.14 567.27 1,005.00 671.40 231.99 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. II-B, III-A, V-A 438.57 283.63 502.50 335.70 116.00 730.95 472.72 837.50 559.50 193.33 U Utility/Misc (Associated w R-3 structures) 2,000 s.f. III-B, IV, V-B 350.86 226.91 402.00 268.56 92.80 584.76 378.18 670.00 447.60 154.66 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. I-A, I-B, II-A 614.00 680.72 703.44 805.68 214.40 1,023.33 1,134.53 1,172.40 1,342.80 357.33 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. II-B, III-A, V-A 511.67 567.27 586.20 671.40 178.67 852.78 945.44 977.00 1,119.00 297.78 U Utility/Misc (Associated w R-3 structures) 4,000 s.f. III-B, IV, V-B 409.33 453.81 468.96 537.12 142.93 682.22 756.36 781.60 895.20 238.22 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. I-A, I-B, II-A 701.71 907.63 803.88 1,074.24 268.78 1,169.52 1,512.71 1,339.80 1,790.40 447.97 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. II-B, III-A, V-A 584.76 756.36 669.90 895.20 223.98 974.60 1,260.59 1,116.50 1,492.00 373.30 U Utility/Misc (Associated w R-3 structures) 8,000 s.f. III-B, IV, V-B 467.81 605.08 535.92 716.16 179.19 779.68 1,008.47 893.20 1,193.60 298.64 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. I-A, I-B, II-A 2,631.43 567.27 3,015.36 671.40 488.06 4,385.72 945.44 5,025.60 1,119.00 813.44 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. II-B, III-A, V-A 2,192.86 472.72 2,512.80 559.50 406.72 3,654.76 787.87 4,188.00 932.50 677.87 H-1, H-2, H-3, H-4 High Hazards/Explosives 1,000 s.f. III-B, IV, V-B 1,754.29 378.18 2,010.24 447.60 325.38 2,923.81 630.30 3,350.40 746.00 542.29 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. I-A, I-B, II-A 3,947.14 1,134.53 4,523.04 1,342.80 784.16 6,578.57 1,890.89 7,538.40 2,238.00 1,306.94 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. II-B, III-A, V-A 3,289.29 945.44 3,769.20 1,119.00 653.47 5,482.14 1,575.74 6,282.00 1,865.00 1,089.12 H-1, H-2, H-3, H-4 High Hazards/Explosives 5,000 s.f. III-B, IV, V-B 2,631.43 756.36 3,015.36 895.20 522.78 4,385.72 1,260.59 5,025.60 1,492.00 871.29 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. I-A, I-B, II-A 4,122.57 1,871.98 4,723.92 2,215.80 945.17 6,870.95 3,119.97 7,873.20 3,693.00 1,575.28 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. II-B, III-A, V-A 3,435.48 1,559.98 3,936.60 1,846.50 787.64 5,725.79 2,599.97 6,561.00 3,077.50 1,312.73 H-1, H-2, H-3, H-4 High Hazards/Explosives 10,000 s.f. III-B, IV, V-B 2,748.38 1,247.99 3,149.28 1,477.20 630.11 4,580.64 2,079.98 5,248.80 2,462.00 1,050.19 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. I-A, I-B, II-A 6,052.29 3,290.15 6,935.40 3,894.84 1,487.81 10,087.14 5,483.58 11,559.00 6,491.40 2,479.68 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. II-B, III-A, V-A 5,043.57 2,741.79 5,779.50 3,245.70 1,239.84 8,405.95 4,569.65 9,632.50 5,409.50 2,066.40 H-1, H-2, H-3, H-4 High Hazards/Explosives 50,000 s.f. III-B, IV, V-B 4,034.86 2,193.43 4,623.60 2,596.56 991.87 6,724.76 3,655.72 7,706.00 4,327.60 1,653.12 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. I-A, I-B, II-A 8,245.14 4,254.50 9,448.20 5,036.40 1,984.96 13,741.91 7,090.83 15,747.00 8,394.00 3,308.26 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. II-B, III-A, V-A 6,870.95 3,545.41 7,873.50 4,197.00 1,654.13 11,451.59 5,909.02 13,122.50 6,995.00 2,756.89 H-1, H-2, H-3, H-4 High Hazards/Explosives 100,000 s.f. III-B, IV, V-B 5,496.76 2,836.33 6,298.80 3,357.60 1,323.31 9,161.27 4,727.22 10,498.00 5,596.00 2,205.51 H-5 HPM, 1,000 s.f. I-A, I-B, II-A 3,859.43 453.81 4,422.24 537.12 646.12 6,432.38 756.36 7,370.40 895.20 1,076.86 H-5 HPM, 1,000 s.f. II-B, III-A, V-A 3,216.19 378.18 3,685.20 447.60 538.43 5,360.32 630.30 6,142.00 746.00 897.39 H-5 HPM, 1,000 s.f. III-B, IV, V-B 2,572.95 302.54 2,948.16 358.08 430.75 4,288.25 504.24 4,913.60 596.80 717.91 H-5 HPM, 5,000 s.f. I-A, I-B, II-A 5,964.57 964.35 6,834.60 1,141.56 1,047.23 9,940.95 1,607.25 11,391.00 1,902.60 1,745.39 H-5 HPM, 5,000 s.f. II-B, III-A, V-A 4,970.48 803.63 5,695.50 951.30 872.70 8,284.13 1,339.38 9,492.50 1,585.50 1,454.49 H-5 HPM, 5,000 s.f. III-B, IV, V-B 3,976.38 642.90 4,556.40 761.04 698.16 6,627.30 1,071.50 7,594.00 1,268.40 1,163.59 H-5 HPM, 10,000 s.f. I-A, I-B, II-A 6,227.72 1,645.07 7,136.28 1,947.24 1,210.73 10,379.53 2,741.79 11,893.80 3,245.40 2,017.89 H-5 HPM, 10,000 s.f. II-B, III-A, V-A 5,189.76 1,370.89 5,946.90 1,622.70 1,008.94 8,649.60 2,284.82 9,911.50 2,704.50 1,681.57 H-5 HPM, 10,000 s.f. III-B, IV, V-B 4,151.81 1,096.72 4,757.52 1,298.16 807.15 6,919.68 1,827.86 7,929.20 2,163.60 1,345.26 Budget Fiscal Year 2026 Page 93 of 108 Updated as of 8/3/26

Page 1208 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
H-5 HPM, 20,000 s.f. I-A, I-B, II-A 7,368.00 2,382.52 8,443.08 2,820.24 1,512.80 12,280.00 3,970.86 14,071.80 4,700.40 2,521.33 H-5 HPM, 20,000 s.f. II-B, III-A, V-A 6,140.00 1,985.43 7,035.90 2,350.20 1,260.67 10,233.34 3,309.05 11,726.50 3,917.00 2,101.11 H-5 HPM, 20,000 s.f. III-B, IV, V-B 4,912.00 1,588.35 5,628.72 1,880.16 1,008.53 8,186.67 2,647.24 9,381.20 3,133.60 1,680.89 H-5 HPM, 50,000 s.f. I-A, I-B, II-A 9,210.00 2,836.33 10,553.76 3,357.72 1,865.15 15,350.00 4,727.22 17,589.60 5,596.20 3,108.58 H-5 HPM, 50,000 s.f. II-B, III-A, V-A 7,675.00 2,363.61 8,794.80 2,798.10 1,554.29 12,791.67 3,939.35 14,658.00 4,663.50 2,590.48 H-5 HPM, 50,000 s.f. III-B, IV, V-B 6,140.00 1,890.89 7,035.84 2,238.48 1,243.43 10,233.34 3,151.48 11,726.40 3,730.80 2,072.38 H-5 HPM, 100,000 s.f. I-A, I-B, II-A 13,069.43 3,687.23 14,976.36 4,365.00 2,584.70 21,782.39 6,145.39 24,960.60 7,275.00 4,307.83 H-5 HPM, 100,000 s.f. II-B, III-A, V-A 10,891.19 3,072.69 12,480.30 3,637.50 2,153.91 18,151.99 5,121.15 20,800.50 6,062.50 3,589.86 H-5 HPM, 100,000 s.f. III-B, IV, V-B 8,712.95 2,458.15 9,984.24 2,910.00 1,723.13 14,521.59 4,096.92 16,640.40 4,850.00 2,871.89 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. I-A, I-B, II-A 3,596.29 623.99 4,120.92 738.36 639.00 5,993.81 1,039.99 6,868.20 1,230.60 1,065.00 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. II-B, III-A, V-A 2,996.91 519.99 3,434.10 615.30 532.50 4,994.84 866.66 5,723.50 1,025.50 887.50 I-1, I-2, I-3 Institutional, Hospital, Jail 1,000 s.f. III-B, IV, V-B 2,397.52 416.00 2,747.28 492.24 426.00 3,995.87 693.33 4,578.80 820.40 710.00 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. I-A, I-B, II-A 5,789.14 1,247.99 6,633.72 1,477.08 1,073.67 9,648.57 2,079.98 11,056.20 2,461.80 1,789.45 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. II-B, III-A, V-A 4,824.29 1,039.99 5,528.10 1,230.90 894.72 8,040.48 1,733.31 9,213.50 2,051.50 1,491.21 I-1, I-2, I-3 Institutional, Hospital, Jail 5,000 s.f. III-B, IV, V-B 3,859.43 831.99 4,422.48 984.72 715.78 6,432.38 1,386.65 7,370.80 1,641.20 1,192.97 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. I-A, I-B, II-A 5,964.57 2,212.34 6,834.60 2,619.00 1,276.69 9,940.95 3,687.23 11,391.00 4,365.00 2,127.81 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. II-B, III-A, V-A 4,970.48 1,843.62 5,695.50 2,182.50 1,063.91 8,284.13 3,072.69 9,492.50 3,637.50 1,773.18 I-1, I-2, I-3 Institutional, Hospital, Jail 10,000 s.f. III-B, IV, V-B 3,976.38 1,474.89 4,556.40 1,746.00 851.13 6,627.30 2,458.15 7,594.00 2,910.00 1,418.54 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. I-A, I-B, II-A 7,104.86 3,119.97 8,141.40 3,693.24 1,609.82 11,841.43 5,199.94 13,569.00 6,155.40 2,683.03 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. II-B, III-A, V-A 5,920.72 2,599.97 6,784.50 3,077.70 1,341.51 9,867.86 4,333.28 11,307.50 5,129.50 2,235.86 I-1, I-2, I-3 Institutional, Hospital, Jail 20,000 s.f. III-B, IV, V-B 4,736.57 2,079.98 5,427.60 2,462.16 1,073.21 7,894.29 3,466.63 9,046.00 4,103.60 1,788.68 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. I-A, I-B, II-A 8,859.14 3,743.96 10,151.64 4,431.96 1,980.50 14,765.24 6,239.93 16,919.40 7,386.60 3,300.83 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. II-B, III-A, V-A 7,382.62 3,119.97 8,459.70 3,693.30 1,650.41 12,304.37 5,199.94 14,099.50 6,155.50 2,750.69 I-1, I-2, I-3 Institutional, Hospital, Jail 50,000 s.f. III-B, IV, V-B 5,906.10 2,495.97 6,767.76 2,954.64 1,320.33 9,843.49 4,159.95 11,279.60 4,924.40 2,200.55 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. I-A, I-B, II-A 12,630.86 4,821.76 14,473.80 5,708.16 2,729.34 21,051.43 8,036.27 24,123.00 9,513.60 4,548.89 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. II-B, III-A, V-A 10,525.72 4,018.14 12,061.50 4,756.80 2,274.45 17,542.86 6,696.89 20,102.50 7,928.00 3,790.74 I-1, I-2, I-3 Institutional, Hospital, Jail 100,000 s.f. III-B, IV, V-B 8,420.57 3,214.51 9,649.20 3,805.44 1,819.56 14,034.29 5,357.52 16,082.00 6,342.40 3,032.60 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. I-A, I-B, II-A 3,596.29 567.27 4,120.92 671.40 628.77 5,993.81 945.44 6,868.20 1,119.00 1,047.95 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. II-B, III-A, V-A 2,996.91 472.72 3,434.10 559.50 523.97 4,994.84 787.87 5,723.50 932.50 873.29 I-4, I-2.1 Day Care/Outpatient 1,000 s.f. III-B, IV, V-B 2,397.52 378.18 2,747.28 447.60 419.18 3,995.87 630.30 4,578.80 746.00 698.63 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. I-A, I-B, II-A 5,701.43 1,191.26 6,533.28 1,410.12 1,050.71 9,502.38 1,985.43 10,888.80 2,350.20 1,751.18 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. II-B, III-A, V-A 4,751.19 992.72 5,444.40 1,175.10 875.59 7,918.65 1,654.53 9,074.00 1,958.50 1,459.32 I-4, I-2.1 Day Care/Outpatient 5,000 s.f. III-B, IV, V-B 3,800.95 794.17 4,355.52 940.08 700.47 6,334.92 1,323.62 7,259.20 1,566.80 1,167.46 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. I-A, I-B, II-A 5,964.57 2,042.16 6,834.60 2,417.40 1,245.27 9,940.95 3,403.60 11,391.00 4,029.00 2,075.45 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. II-B, III-A, V-A 4,970.48 1,701.80 5,695.50 2,014.50 1,037.72 8,284.13 2,836.33 9,492.50 3,357.50 1,729.54 I-4, I-2.1 Day Care/Outpatient 10,000 s.f. III-B, IV, V-B 3,976.38 1,361.44 4,556.40 1,611.60 830.18 6,627.30 2,269.07 7,594.00 2,686.00 1,383.63 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. I-A, I-B, II-A 7,104.86 2,949.79 8,141.40 3,492.00 1,578.76 11,841.43 4,916.31 13,569.00 5,820.00 2,631.26 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. II-B, III-A, V-A 5,920.72 2,458.15 6,784.50 2,910.00 1,315.63 9,867.86 4,096.92 11,307.50 4,850.00 2,192.72 I-4, I-2.1 Day Care/Outpatient 20,000 s.f. III-B, IV, V-B 4,736.57 1,966.52 5,427.60 2,328.00 1,052.50 7,894.29 3,277.54 9,046.00 3,880.00 1,754.17 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. I-A, I-B, II-A 8,859.14 3,517.05 10,151.64 4,163.40 1,938.84 14,765.24 5,861.75 16,919.40 6,939.00 3,231.41 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. II-B, III-A, V-A 7,382.62 2,930.88 8,459.70 3,469.50 1,615.70 12,304.37 4,884.79 14,099.50 5,782.50 2,692.84 I-4, I-2.1 Day Care/Outpatient 50,000 s.f. III-B, IV, V-B 5,906.10 2,344.70 6,767.76 2,775.60 1,292.56 9,843.49 3,907.84 11,279.60 4,626.00 2,154.27 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. I-A, I-B, II-A 12,630.86 4,254.50 14,473.80 5,036.40 2,624.84 21,051.43 7,090.83 24,123.00 8,394.00 4,374.74 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. II-B, III-A, V-A 10,525.72 3,545.41 12,061.50 4,197.00 2,187.37 17,542.86 5,909.02 20,102.50 6,995.00 3,645.61 I-4, I-2.1 Day Care/Outpatient 100,000 s.f. III-B, IV, V-B 8,420.57 2,836.33 9,649.20 3,357.60 1,749.89 14,034.29 4,727.22 16,082.00 5,596.00 2,916.49 Budget Fiscal Year 2026 Page 94 of 108 Updated as of 8/3/26

Page 1209 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
M Mercantile 1,000 s.f. I-A, I-B, II-A 2,456.00 964.35 2,814.12 1,141.56 535.33 4,093.33 1,607.25 4,690.20 1,902.60 892.21 M Mercantile 1,000 s.f. II-B, III-A, V-A 2,046.67 803.63 2,345.10 951.30 446.11 3,411.11 1,339.38 3,908.50 1,585.50 743.51 M Mercantile 1,000 s.f. III-B, IV, V-B 1,637.33 642.90 1,876.08 761.04 356.88 2,728.89 1,071.50 3,126.80 1,268.40 594.81 M Mercantile 5,000 s.f. I-A, I-B, II-A 3,771.72 1,474.89 4,321.80 1,746.00 821.19 6,286.19 2,458.15 7,203.00 2,910.00 1,368.65 M Mercantile 5,000 s.f. II-B, III-A, V-A 3,143.10 1,229.08 3,601.50 1,455.00 684.33 5,238.49 2,048.46 6,002.50 2,425.00 1,140.54 M Mercantile 5,000 s.f. III-B, IV, V-B 2,514.48 983.26 2,881.20 1,164.00 547.46 4,190.79 1,638.77 4,802.00 1,940.00 912.44 M Mercantile 10,000 s.f. I-A, I-B, II-A 3,947.14 2,212.34 4,523.04 2,619.00 982.56 6,578.57 3,687.23 7,538.40 4,365.00 1,637.60 M Mercantile 10,000 s.f. II-B, III-A, V-A 3,289.29 1,843.62 3,769.20 2,182.50 818.80 5,482.14 3,072.69 6,282.00 3,637.50 1,364.66 M Mercantile 10,000 s.f. III-B, IV, V-B 2,631.43 1,474.89 3,015.36 1,746.00 655.04 4,385.72 2,458.15 5,025.60 2,910.00 1,091.73 M Mercantile 20,000 s.f. I-A, I-B, II-A 4,648.86 3,346.87 5,326.92 3,962.16 1,293.35 7,748.10 5,578.12 8,878.20 6,603.60 2,155.58 M Mercantile 20,000 s.f. II-B, III-A, V-A 3,874.05 2,789.06 4,439.10 3,301.80 1,077.79 6,456.75 4,648.43 7,398.50 5,503.00 1,796.32 M Mercantile 20,000 s.f. III-B, IV, V-B 3,099.24 2,231.25 3,551.28 2,641.44 862.23 5,165.40 3,718.75 5,918.80 4,402.40 1,437.06 M Mercantile 50,000 s.f. I-A, I-B, II-A 5,789.14 4,311.22 6,633.72 5,103.72 1,637.07 9,648.57 7,185.37 11,056.20 8,506.20 2,728.45 M Mercantile 50,000 s.f. II-B, III-A, V-A 4,824.29 3,592.69 5,528.10 4,253.10 1,364.23 8,040.48 5,987.81 9,213.50 7,088.50 2,273.71 M Mercantile 50,000 s.f. III-B, IV, V-B 3,859.43 2,874.15 4,422.48 3,402.48 1,091.38 6,432.38 4,790.25 7,370.80 5,670.80 1,818.97 M Mercantile 100,000 s.f. I-A, I-B, II-A 6,578.57 5,559.21 7,538.40 6,581.16 1,981.78 10,964.29 9,265.35 12,564.00 10,968.60 3,302.96 M Mercantile 100,000 s.f. II-B, III-A, V-A 5,482.14 4,632.68 6,282.00 5,484.30 1,651.48 9,136.91 7,721.13 10,470.00 9,140.50 2,752.47 M Mercantile 100,000 s.f. III-B, IV, V-B 4,385.72 3,706.14 5,025.60 4,387.44 1,321.18 7,309.53 6,176.90 8,376.00 7,312.40 2,201.97 M Mercantile 200,000 s.f. I-A, I-B, II-A 7,368.00 7,317.74 8,443.08 8,663.04 2,420.38 12,280.00 12,196.23 14,071.80 14,438.40 4,033.97 M Mercantile 200,000 s.f. II-B, III-A, V-A 6,140.00 6,098.11 7,035.90 7,219.20 2,016.98 10,233.34 10,163.52 11,726.50 12,032.00 3,361.64 M Mercantile 200,000 s.f. III-B, IV, V-B 4,912.00 4,878.49 5,628.72 5,775.36 1,613.59 8,186.67 8,130.82 9,381.20 9,625.60 2,689.31 R-1 Apartments/Hotel Transient 1,000 s.f. I-A, I-B, II-A 3,070.00 1,077.81 3,517.92 1,275.84 645.95 5,116.67 1,796.34 5,863.20 2,126.40 1,076.59 R-1 Apartments/Hotel Transient 1,000 s.f. II-B, III-A, V-A 2,558.33 898.17 2,931.60 1,063.20 538.29 4,263.89 1,496.95 4,886.00 1,772.00 897.16 R-1 Apartments/Hotel Transient 1,000 s.f. III-B, IV, V-B 2,046.67 718.54 2,345.28 850.56 430.64 3,411.11 1,197.56 3,908.80 1,417.60 717.73 R-1 Apartments/Hotel Transient 5,000 s.f. I-A, I-B, II-A 4,736.57 2,042.16 5,427.72 2,417.40 1,066.39 7,894.29 3,403.60 9,046.20 4,029.00 1,777.31 R-1 Apartments/Hotel Transient 5,000 s.f. II-B, III-A, V-A 3,947.14 1,701.80 4,523.10 2,014.50 888.66 6,578.57 2,836.33 7,538.50 3,357.50 1,481.10 R-1 Apartments/Hotel Transient 5,000 s.f. III-B, IV, V-B 3,157.71 1,361.44 3,618.48 1,611.60 710.93 5,262.86 2,269.07 6,030.80 2,686.00 1,184.88 R-1 Apartments/Hotel Transient 10,000 s.f. I-A, I-B, II-A 4,912.00 3,403.60 5,628.60 4,029.12 1,342.12 8,186.67 5,672.66 9,381.00 6,715.20 2,236.87 R-1 Apartments/Hotel Transient 10,000 s.f. II-B, III-A, V-A 4,093.33 2,836.33 4,690.50 3,357.60 1,118.43 6,822.22 4,727.22 7,817.50 5,596.00 1,864.06 R-1 Apartments/Hotel Transient 10,000 s.f. III-B, IV, V-B 3,274.67 2,269.07 3,752.40 2,686.08 894.75 5,457.78 3,781.78 6,254.00 4,476.80 1,491.25 R-1 Apartments/Hotel Transient 20,000 s.f. I-A, I-B, II-A 5,789.14 4,765.04 6,633.72 5,640.84 1,720.38 9,648.57 7,941.73 11,056.20 9,401.40 2,867.30 R-1 Apartments/Hotel Transient 20,000 s.f. II-B, III-A, V-A 4,824.29 3,970.86 5,528.10 4,700.70 1,433.65 8,040.48 6,618.11 9,213.50 7,834.50 2,389.41 R-1 Apartments/Hotel Transient 20,000 s.f. III-B, IV, V-B 3,859.43 3,176.69 4,422.48 3,760.56 1,146.92 6,432.38 5,294.49 7,370.80 6,267.60 1,911.53 R-1 Apartments/Hotel Transient 50,000 s.f. I-A, I-B, II-A 7,280.29 5,729.39 8,342.28 6,782.40 2,115.00 12,133.81 9,548.98 13,903.80 11,304.00 3,525.00 R-1 Apartments/Hotel Transient 50,000 s.f. II-B, III-A, V-A 6,066.91 4,774.49 6,951.90 5,652.00 1,762.50 10,111.51 7,957.49 11,586.50 9,420.00 2,937.50 R-1 Apartments/Hotel Transient 50,000 s.f. III-B, IV, V-B 4,853.52 3,819.59 5,561.52 4,521.60 1,410.00 8,089.21 6,365.99 9,269.20 7,536.00 2,350.00 R-1 Apartments/Hotel Transient 100,000 s.f. I-A, I-B, II-A 10,262.57 7,374.46 11,759.76 8,730.00 2,852.72 17,104.29 12,290.77 19,599.60 14,550.00 4,754.54 R-1 Apartments/Hotel Transient 100,000 s.f. II-B, III-A, V-A 8,552.14 6,145.39 9,799.80 7,275.00 2,377.27 14,253.57 10,242.31 16,333.00 12,125.00 3,962.12 R-1 Apartments/Hotel Transient 100,000 s.f. III-B, IV, V-B 6,841.72 4,916.31 7,839.84 5,820.00 1,901.82 11,402.86 8,193.85 13,066.40 9,700.00 3,169.69 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. I-A, I-B, II-A 3,070.00 1,021.08 3,517.92 1,208.52 635.36 5,116.67 1,701.80 5,863.20 2,014.20 1,058.93 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. II-B, III-A, V-A 2,558.33 850.90 2,931.60 1,007.10 529.47 4,263.89 1,418.17 4,886.00 1,678.50 882.44 R-2 Multi-Family Residential Apartment - Perm 1,000 s.f. III-B, IV, V-B 2,046.67 680.72 2,345.28 805.68 423.57 3,411.11 1,134.53 3,908.80 1,342.80 705.96 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. I-A, I-B, II-A 4,385.72 1,928.71 5,025.60 2,283.12 994.30 7,309.53 3,214.51 8,376.00 3,805.20 1,657.17 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. II-B, III-A, V-A 3,654.76 1,607.25 4,188.00 1,902.60 828.58 6,091.27 2,678.76 6,980.00 3,171.00 1,380.97 R-2 Multi-Family Residential Apartment - Perm 5,000 s.f. III-B, IV, V-B 2,923.81 1,285.80 3,350.40 1,522.08 662.87 4,873.02 2,143.01 5,584.00 2,536.80 1,104.78 Budget Fiscal Year 2026 Page 95 of 108 Updated as of 8/3/26

Page 1210 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. I-A, I-B, II-A 4,473.43 3,403.60 5,126.04 4,029.12 1,278.13 7,455.72 5,672.66 8,543.40 6,715.20 2,130.22 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. II-B, III-A, V-A 3,727.86 2,836.33 4,271.70 3,357.60 1,065.11 6,213.10 4,727.22 7,119.50 5,596.00 1,775.18 R-2 Multi-Family Residential Apartment - Perm 10,000 s.f. III-B, IV, V-B 2,982.29 2,269.07 3,417.36 2,686.08 852.09 4,970.48 3,781.78 5,695.60 4,476.80 1,420.15 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. I-A, I-B, II-A 5,262.86 4,141.04 6,030.72 4,902.12 1,528.94 8,771.43 6,901.74 10,051.20 8,170.20 2,548.23 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. II-B, III-A, V-A 4,385.72 3,450.87 5,025.60 4,085.10 1,274.11 7,309.53 5,751.45 8,376.00 6,808.50 2,123.52 R-2 Multi-Family Residential Apartment - Perm 20,000 s.f. III-B, IV, V-B 3,508.57 2,760.70 4,020.48 3,268.08 1,019.29 5,847.62 4,601.16 6,700.80 5,446.80 1,698.82 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. I-A, I-B, II-A 6,490.86 5,048.67 7,437.96 5,976.72 1,875.15 10,818.10 8,414.45 12,396.60 9,961.20 3,125.25 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. II-B, III-A, V-A 5,409.05 4,207.23 6,198.30 4,980.60 1,562.63 9,015.08 7,012.04 10,330.50 8,301.00 2,604.38 R-2 Multi-Family Residential Apartment - Perm 50,000 s.f. III-B, IV, V-B 4,327.24 3,365.78 4,958.64 3,984.48 1,250.10 7,212.06 5,609.63 8,264.40 6,640.80 2,083.50 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. I-A, I-B, II-A 8,859.14 6,353.38 10,151.64 7,521.12 2,460.23 14,765.24 10,588.97 16,919.40 12,535.20 4,100.39 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. II-B, III-A, V-A 7,382.62 5,294.49 8,459.70 6,267.60 2,050.19 12,304.37 8,824.14 14,099.50 10,446.00 3,416.99 R-2 Multi-Family Residential Apartment - Perm 100,000 s.f. III-B, IV, V-B 5,906.10 4,235.59 6,767.76 5,014.08 1,640.15 9,843.49 7,059.32 11,279.60 8,356.80 2,733.59 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. I-A, I-B, II-A 3,684.00 1,418.17 4,221.36 1,678.68 797.87 6,140.00 2,363.61 7,035.60 2,797.80 1,329.79 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. II-B, III-A, V-A 3,070.00 1,181.80 3,517.80 1,398.90 664.89 5,116.67 1,969.67 5,863.00 2,331.50 1,108.16 R-2.1 Residential Care/Assist Living Facility 1,000 s.f. III-B, IV, V-B 2,456.00 945.44 2,814.24 1,119.12 531.92 4,093.33 1,575.74 4,690.40 1,865.20 886.53 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. I-A, I-B, II-A 5,262.86 1,815.25 6,030.72 2,148.84 1,101.45 8,771.43 3,025.42 10,051.20 3,581.40 1,835.75 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. II-B, III-A, V-A 4,385.72 1,512.71 5,025.60 1,790.70 917.87 7,309.53 2,521.18 8,376.00 2,984.50 1,529.79 R-2.1 Residential Care/Assist Living Facility 5,000 s.f. III-B, IV, V-B 3,508.57 1,210.17 4,020.48 1,432.56 734.30 5,847.62 2,016.95 6,700.80 2,387.60 1,223.83 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. I-A, I-B, II-A 5,438.29 2,382.52 6,231.60 2,820.24 1,231.03 9,063.81 3,970.86 10,386.00 4,700.40 2,051.72 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. II-B, III-A, V-A 4,531.91 1,985.43 5,193.00 2,350.20 1,025.86 7,553.18 3,309.05 8,655.00 3,917.00 1,709.77 R-2.1 Residential Care/Assist Living Facility 10,000 s.f. III-B, IV, V-B 3,625.52 1,588.35 4,154.40 1,880.16 820.69 6,042.54 2,647.24 6,924.00 3,133.60 1,367.82 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. I-A, I-B, II-A 6,490.86 3,063.24 7,437.96 3,626.28 1,510.14 10,818.10 5,105.40 12,396.60 6,043.80 2,516.91 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. II-B, III-A, V-A 5,409.05 2,552.70 6,198.30 3,021.90 1,258.45 9,015.08 4,254.50 10,330.50 5,036.50 2,097.42 R-2.1 Residential Care/Assist Living Facility 20,000 s.f. III-B, IV, V-B 4,327.24 2,042.16 4,958.64 2,417.52 1,006.76 7,212.06 3,403.60 8,264.40 4,029.20 1,677.94 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. I-A, I-B, II-A 7,894.29 4,027.59 9,046.08 4,767.84 1,892.04 13,157.15 6,712.65 15,076.80 7,946.40 3,153.40 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. II-B, III-A, V-A 6,578.57 3,356.33 7,538.40 3,973.20 1,576.70 10,964.29 5,593.88 12,564.00 6,622.00 2,627.84 R-2.1 Residential Care/Assist Living Facility 50,000 s.f. III-B, IV, V-B 5,262.86 2,685.06 6,030.72 3,178.56 1,261.36 8,771.43 4,475.10 10,051.20 5,297.60 2,102.27 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. I-A, I-B, II-A 10,788.86 5,218.85 12,363.12 6,178.32 2,533.73 17,981.43 8,698.08 20,605.20 10,297.20 4,222.88 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. II-B, III-A, V-A 8,990.72 4,349.04 10,302.60 5,148.60 2,111.44 14,984.53 7,248.40 17,171.00 8,581.00 3,519.07 R-2.1 Residential Care/Assist Living Facility 100,000 s.f. III-B, IV, V-B 7,192.57 3,479.23 8,242.08 4,118.88 1,689.15 11,987.62 5,798.72 13,736.80 6,864.80 2,815.26 R-3 Single Family Residential 2,000 s.f. I-A, I-B, II-A 1,228.00 397.09 1,406.88 469.80 251.59 2,046.67 661.81 2,344.80 783.00 419.32 R-3 Single Family Residential 2,000 s.f. II-B, III-A, V-A 1,023.33 330.91 1,172.40 391.50 209.66 1,705.56 551.51 1,954.00 652.50 349.44 R-3 Single Family Residential 2,000 s.f. III-B, IV, V-B 818.67 264.72 937.92 313.20 167.73 1,364.44 441.21 1,563.20 522.00 279.55 R-3 Single Family Residential 3,000 s.f. I-A, I-B, II-A 1,578.86 453.81 1,809.00 537.12 313.45 2,631.43 756.36 3,015.00 895.20 522.42 R-3 Single Family Residential 3,000 s.f. II-B, III-A, V-A 1,315.71 378.18 1,507.50 447.60 261.21 2,192.86 630.30 2,512.50 746.00 435.35 R-3 Single Family Residential 3,000 s.f. III-B, IV, V-B 1,052.57 302.54 1,206.00 358.08 208.97 1,754.29 504.24 2,010.00 596.80 348.28 R-3 Single Family Residential 5,000 s.f. I-A, I-B, II-A 2,280.57 623.99 2,613.24 738.36 447.04 3,800.95 1,039.99 4,355.40 1,230.60 745.06 R-3 Single Family Residential 5,000 s.f. II-B, III-A, V-A 1,900.48 519.99 2,177.70 615.30 372.53 3,167.46 866.66 3,629.50 1,025.50 620.88 R-3 Single Family Residential 5,000 s.f. III-B, IV, V-B 1,520.38 416.00 1,742.16 492.24 298.02 2,533.97 693.33 2,903.60 820.40 496.71 R-3 Single Family Residential 10,000 s.f. I-A, I-B, II-A 2,543.71 850.90 2,914.56 1,007.28 527.23 4,239.52 1,418.17 4,857.60 1,678.80 878.71 R-3 Single Family Residential 10,000 s.f. II-B, III-A, V-A 2,119.76 709.08 2,428.80 839.40 439.35 3,532.94 1,181.80 4,048.00 1,399.00 732.26 R-3 Single Family Residential 10,000 s.f. III-B, IV, V-B 1,695.81 567.27 1,943.04 671.52 351.48 2,826.35 945.44 3,238.40 1,119.20 585.81 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. I-A, I-B, II-A 3,684.00 794.17 4,221.36 939.96 683.15 6,140.00 1,323.62 7,035.60 1,566.60 1,138.58 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. II-B, III-A, V-A 3,070.00 661.81 3,517.80 783.30 569.29 5,116.67 1,103.02 5,863.00 1,305.50 948.81 R-3.1 Residential Care Facility <6 Ambulatory 1,000 s.f. III-B, IV, V-B 2,456.00 529.45 2,814.24 626.64 455.43 4,093.33 882.41 4,690.40 1,044.40 759.05 Budget Fiscal Year 2026 Page 96 of 108 Updated as of 8/3/26

Page 1211 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. I-A, I-B, II-A 5,262.86 1,247.99 6,030.72 1,477.08 996.96 8,771.43 2,079.98 10,051.20 2,461.80 1,661.59 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. II-B, III-A, V-A 4,385.72 1,039.99 5,025.60 1,230.90 830.80 7,309.53 1,733.31 8,376.00 2,051.50 1,384.66 R-3.1 Residential Care Facility <6 Ambulatory 5,000 s.f. III-B, IV, V-B 3,508.57 831.99 4,020.48 984.72 664.64 5,847.62 1,386.65 6,700.80 1,641.20 1,107.73 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. I-A, I-B, II-A 5,438.29 1,701.80 6,231.60 2,014.56 1,106.07 9,063.81 2,836.33 10,386.00 3,357.60 1,843.46 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. II-B, III-A, V-A 4,531.91 1,418.17 5,193.00 1,678.80 921.73 7,553.18 2,363.61 8,655.00 2,798.00 1,536.21 R-3.1 Residential Care Facility <6 Ambulatory 10,000 s.f. III-B, IV, V-B 3,625.52 1,134.53 4,154.40 1,343.04 737.38 6,042.54 1,890.89 6,924.00 2,238.40 1,228.97 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. I-A, I-B, II-A 6,490.86 2,382.52 7,437.96 2,820.24 1,384.82 10,818.10 3,970.86 12,396.60 4,700.40 2,308.04 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. II-B, III-A, V-A 5,409.05 1,985.43 6,198.30 2,350.20 1,154.02 9,015.08 3,309.05 10,330.50 3,917.00 1,923.36 R-3.1 Residential Care Facility <6 Ambulatory 20,000 s.f. III-B, IV, V-B 4,327.24 1,588.35 4,958.64 1,880.16 923.22 7,212.06 2,647.24 8,264.40 3,133.60 1,538.69 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. I-A, I-B, II-A 7,894.29 2,836.33 9,046.08 3,357.72 1,673.18 13,157.15 4,727.22 15,076.80 5,596.20 2,788.63 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. II-B, III-A, V-A 6,578.57 2,363.61 7,538.40 2,798.10 1,394.32 10,964.29 3,939.35 12,564.00 4,663.50 2,323.86 R-3.1 Residential Care Facility <6 Ambulatory 50,000 s.f. III-B, IV, V-B 5,262.86 1,890.89 6,030.72 2,238.48 1,115.45 8,771.43 3,151.48 10,051.20 3,730.80 1,859.09 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. I-A, I-B, II-A 10,788.86 3,687.23 12,363.12 4,365.00 2,252.03 17,981.43 6,145.39 20,605.20 7,275.00 3,753.38 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. II-B, III-A, V-A 8,990.72 3,072.69 10,302.60 3,637.50 1,876.69 14,984.53 5,121.15 17,171.00 6,062.50 3,127.82 R-3.1 Residential Care Facility <6 Ambulatory 100,000 s.f. III-B, IV, V-B 7,192.57 2,458.15 8,242.08 2,910.00 1,501.35 11,987.62 4,096.92 13,736.80 4,850.00 2,502.25 R-4 Residential Care/Assisted Living Facility 1,000 s.f. I-A, I-B, II-A 3,684.00 567.27 4,221.36 671.40 641.49 6,140.00 945.44 7,035.60 1,119.00 1,069.15 R-4 Residential Care/Assisted Living Facility 1,000 s.f. II-B, III-A, V-A 3,070.00 472.72 3,517.80 559.50 534.58 5,116.67 787.87 5,863.00 932.50 890.96 R-4 Residential Care/Assisted Living Facility 1,000 s.f. III-B, IV, V-B 2,456.00 378.18 2,814.24 447.60 427.66 4,093.33 630.30 4,690.40 746.00 712.77 R-4 Residential Care/Assisted Living Facility 5,000 s.f. I-A, I-B, II-A 5,262.86 1,021.08 6,030.72 1,208.52 955.30 8,771.43 1,701.80 10,051.20 2,014.20 1,592.17 R-4 Residential Care/Assisted Living Facility 5,000 s.f. II-B, III-A, V-A 4,385.72 850.90 5,025.60 1,007.10 796.09 7,309.53 1,418.17 8,376.00 1,678.50 1,326.81 R-4 Residential Care/Assisted Living Facility 5,000 s.f. III-B, IV, V-B 3,508.57 680.72 4,020.48 805.68 636.87 5,847.62 1,134.53 6,700.80 1,342.80 1,061.45 R-4 Residential Care/Assisted Living Facility 10,000 s.f. I-A, I-B, II-A 5,438.29 1,701.80 6,231.60 2,014.56 1,106.07 9,063.81 2,836.33 10,386.00 3,357.60 1,843.46 R-4 Residential Care/Assisted Living Facility 10,000 s.f. II-B, III-A, V-A 4,531.91 1,418.17 5,193.00 1,678.80 921.73 7,553.18 2,363.61 8,655.00 2,798.00 1,536.21 R-4 Residential Care/Assisted Living Facility 10,000 s.f. III-B, IV, V-B 3,625.52 1,134.53 4,154.40 1,343.04 737.38 6,042.54 1,890.89 6,924.00 2,238.40 1,228.97 R-4 Residential Care/Assisted Living Facility 20,000 s.f. I-A, I-B, II-A 6,490.86 2,212.34 7,437.96 2,619.00 1,353.76 10,818.10 3,687.23 12,396.60 4,365.00 2,256.27 R-4 Residential Care/Assisted Living Facility 20,000 s.f. II-B, III-A, V-A 5,409.05 1,843.62 6,198.30 2,182.50 1,128.14 9,015.08 3,072.69 10,330.50 3,637.50 1,880.23 R-4 Residential Care/Assisted Living Facility 20,000 s.f. III-B, IV, V-B 4,327.24 1,474.89 4,958.64 1,746.00 902.51 7,212.06 2,458.15 8,264.40 2,910.00 1,504.18 R-4 Residential Care/Assisted Living Facility 50,000 s.f. I-A, I-B, II-A 7,894.29 2,666.15 9,046.08 3,156.12 1,641.76 13,157.15 4,443.59 15,076.80 5,260.20 2,736.27 R-4 Residential Care/Assisted Living Facility 50,000 s.f. II-B, III-A, V-A 6,578.57 2,221.79 7,538.40 2,630.10 1,368.13 10,964.29 3,702.99 12,564.00 4,383.50 2,280.22 R-4 Residential Care/Assisted Living Facility 50,000 s.f. III-B, IV, V-B 5,262.86 1,777.43 6,030.72 2,104.08 1,094.51 8,771.43 2,962.39 10,051.20 3,506.80 1,824.18 R-4 Residential Care/Assisted Living Facility 100,000 s.f. I-A, I-B, II-A 10,788.86 3,403.60 12,363.12 4,029.12 2,199.78 17,981.43 5,672.66 20,605.20 6,715.20 3,666.30 R-4 Residential Care/Assisted Living Facility 100,000 s.f. II-B, III-A, V-A 8,990.72 2,836.33 10,302.60 3,357.60 1,833.15 14,984.53 4,727.22 17,171.00 5,596.00 3,055.25 R-4 Residential Care/Assisted Living Facility 100,000 s.f. III-B, IV, V-B 7,192.57 2,269.07 8,242.08 2,686.08 1,466.52 11,987.62 3,781.78 13,736.80 4,476.80 2,444.20 U Detached Access. Structure 2,000 s.f. I-A, I-B, II-A 1,403.43 737.45 1,608.12 873.00 340.24 2,339.05 1,229.08 2,680.20 1,455.00 567.07 U Detached Access. Structure 2,000 s.f. II-B, III-A, V-A 1,169.52 614.54 1,340.10 727.50 283.54 1,949.21 1,024.23 2,233.50 1,212.50 472.56 U Detached Access. Structure 2,000 s.f. III-B, IV, V-B 935.62 491.63 1,072.08 582.00 226.83 1,559.37 819.38 1,786.80 970.00 378.05 U Detached Access. Structure 3,000 s.f. I-A, I-B, II-A 1,754.29 794.17 2,010.24 939.96 401.74 2,923.81 1,323.62 3,350.40 1,566.60 669.57 U Detached Access. Structure 3,000 s.f. II-B, III-A, V-A 1,461.91 661.81 1,675.20 783.30 334.78 2,436.51 1,103.02 2,792.00 1,305.50 557.97 U Detached Access. Structure 3,000 s.f. III-B, IV, V-B 1,169.52 529.45 1,340.16 626.64 267.83 1,949.21 882.41 2,233.60 1,044.40 446.38 U Detached Access. Structure 5,000 s.f. I-A, I-B, II-A 2,543.71 1,191.26 2,914.56 1,410.12 589.71 4,239.52 1,985.43 4,857.60 2,350.20 982.84 U Detached Access. Structure 5,000 s.f. II-B, III-A, V-A 2,119.76 992.72 2,428.80 1,175.10 491.42 3,532.94 1,654.53 4,048.00 1,958.50 819.04 U Detached Access. Structure 5,000 s.f. III-B, IV, V-B 1,695.81 794.17 1,943.04 940.08 393.14 2,826.35 1,323.62 3,238.40 1,566.80 655.23 U Detached Access. Structure 10,000 s.f. I-A, I-B, II-A 2,806.86 1,588.35 3,216.24 1,880.28 701.32 4,678.10 2,647.24 5,360.40 3,133.80 1,168.86 U Detached Access. Structure 10,000 s.f. II-B, III-A, V-A 2,339.05 1,323.62 2,680.20 1,566.90 584.43 3,898.41 2,206.04 4,467.00 2,611.50 974.05 U Detached Access. Structure 10,000 s.f. III-B, IV, V-B 1,871.24 1,058.90 2,144.16 1,253.52 467.54 3,118.73 1,764.83 3,573.60 2,089.20 779.24 Budget Fiscal Year 2026 Page 97 of 108 Updated as of 8/3/26

Page 1212 of 2528 ends

BUILDING DIVISION - Table F: Tenant Improvements
Service
Name
Dollar
Change
Dollar
Change
Non-Structural Review
Percentage of New Construction
Structural Review
Percentage of New Construction
30%
50%
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only
Plan Check Only
(with PME
included)
Inspection
Only

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

NON-MARKET BASED FEES
Inspection
Only
Total Dollar
Change
Total Dollar
Change
Recommended
Fee
Plan Check Only
(with PME
included)
Non Structural Structural
50%
Current
Fee
Current
Fee
30%
Recommended
Fee
Footnotes:

1. 30% is for non-structural review as determined by the Building Official.

2. 50% is for structural review as determined by the Building Official.

3. Minor rounding differences may occur as the actual permits are based on a percentage of Table A.

4. The plan check fee includes 3 reviews. Should there be more than 3 reviews, additional hourly fees will be charged at the hourly plan review rate.

5. Where plans are incomplete or changed so as to require additional plan checks, an additional plan check fee shall be charged at the rate established by the fee schedule and minimum hours as determined by the Building Official.

Budget Fiscal Year 2026 Page 98 of 108 Updated as of 8/3/26

Page 1213 of 2528 ends

Fee
Discount/
Waiver
(CMC 3.02)
Prop 26
Exemption
Reference
Number
Service
Name
Fee
Description
Current
Fee
Recom.

Fee
Dollar
Change
Recovery
Level

ADMINISTRATIVE PENALTIES
5 Administrative Penalties Schedule See Schedule See Schedule - 0 - 100%

LEGAL AND RISK MANAGEMENT
- Cost Recovery Payment Schedule for Damage to City See Schedule See Schedule - 0 - 100% Personal Property

POLICE DEPARTMENT
5 Parking Violation Penalty Schedule See Schedule See Schedule - 0 - 100% (moved from Police
Department section)

CITY OF CORONA

MASTER FEE RECOVERY SCHEDULE

OTHER FEES
Budget Fiscal Year 2026 Page 99 of 108 Updated as of 8/3/26

Page 1214 of 2528 ends

EXHIBIT " A"
CITY OF CORONA.

ADMINISTRATIVE PENALTIES SCHEDULE
CORONA

MUNICIPAL

CODE ( CMC)

PROVISION

DESCRIPTION
CMC 5. 44
CMC 5.5 and/ or
Ordinance No. 3383
Garage Sale permit
required/ regulations
Short- tem residential
rental units
CMC 8. 32. 030( I -I)
CMC 9. 17
roperty maintenance
regulations/ Trah &
recycling containers
Host Obligations
CMC. 9. 19
other CMC provisions
CMC 9. 31
CMC 9. 33. 020
CMC 9. 33. 020
CMC 13. 08
CMC 13.4.70
CMC 17. 74. 200( A)
All Others
Cannabis Businesses
Graffiti Prevention
Fireworks prohibited
sale & sane"
Fireworks prohibited —
dangerous"
Public Sewerage
System Waste
Reuiations
Water Theft
Signs illegally erected
on public property or
right- of- way
x
4156 S156 I S156
JPDATED: 04- 17- 24 (RESO 2024- 00"
8500 $ 1000
1, 0000 41, 000
1, 000 51, 00( 1
S1, 000 41, 000
S2, 000 $ 5, 000
4 Budget Fiscal Year 2026 Page 100 of 108 Updated as of 8/3/26

Page 1215 of 2528 ends

(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Fire Hydrants
The cost recovery payment amount for damage to a fire hydrant is based on recent historical average labor, material and vehicle costs to respond and repair or replace the fire hydrant using City personnel. If applicable, the billed amount shall also include the actual cost of water loss for each incident, as well as any third party equipment rental or other incurred costs.

Standard Costs Replacement Repair
City Labor Cost $1,229.37 $1,110.89
Material Cost $2,255.75 $262.11
Vehicle Cost $52.20 $93.48
$3,537.32 $1,466.48
Add:

Water Loss Actual Actual
Equipment Rental/Other Actual Actual
If the City contracts with a third party vendor to provide any portion of the services or materials covered by the above payment amount, the City shall not charge such duplicate portion(s) of the payment amount and shall only pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.

Budget Fiscal Year 2026 Page 101 of 108 Updated as of 8/3/26

Page 1216 of 2528 ends

(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Street or Other Traffic Signs
The cost recovery payment amount for damage to a basic City street sign or other basic traffic sign is based on recent historical average labor, material and vehicle costs to respond and repair or replace the sign using City personnel. If applicable, the billed amount shall also include any third party equipment rental or other incurred costs.

Standard Costs Replacement/Repair
City Labor Cost $399.98
Material Cost $157.35
Vehicle Cost $13.40
$570.73
Add:

Equipment Rental/Other Actual
If the City contracts with a third party vendor to provide any portion of the services or materials covered by the above payment amount, the City shall not charge such duplicate portion(s) of the payment amount and shall only pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.

If a sign is not a basic type, as determined by the Director of Public Works, the City may pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.

Budget Fiscal Year 2026 Page 102 of 108 Updated as of 8/3/26

Page 1217 of 2528 ends

(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Light Poles
The cost recovery payment amount for damage to a standard City light pole is based on recent historical average labor, material and equipment/vehicle costs to respond and repair or replace the light pole using City personnel, sometimes with supplemental support from a third party contractor. If applicable, the billed amount shall also include any third party contractors, equipment rental or other incurred costs.

Replace Replace Light and/or
Standard Costs Pole Electrical Cabinet Repair
City Labor Cost $2,227.51 $1,013.90 $474.61
Material Cost $3,586.03 $2,243.28 $0.00
Equipment/Vehicle Cost $204.16 $38.01 $12.37
$6,017.70 $3,295.19 $486.98
Add:

Contractor (Supplemental) Actual Actual Actual
Equipment Rental/Other Actual Actual Actual
If the City contracts with a third party vendor to provide any portion of the services or materials covered by the above payment amount, the City shall not charge such duplicate portion(s) of the payment amount and shall only pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.

If a light pole is not a standard type, as determined by the General Manager or Director of Public Works, the City may pursue and collect the total actual costs incurred by the City as provided for in Section 5 of the Resolution.

Budget Fiscal Year 2026 Page 103 of 108 Updated as of 8/3/26

Page 1218 of 2528 ends

(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Vehicles
The cost recovery payment amount for damage to a City vehicle varies based upon the type of vehicle and is based on a reasonable estimated amount of time for City personnel to respond and coordinate the vehicle repairs. The billed amount shall also include any third party towing fees and repair costs, and may include other incurred costs. Although not typically the case, if the repairs are performed by City personnel, the total actual cost for such labor will be included as well.

City Response/
Standard Costs Coordination Labor Cost
Police Vehicle $289.34
Fire Engine $320.99
Utility Truck $226.10
Other City Vehicle $226.10
Add:

Towing Actual
Repair (Parts & Labor) Actual
Other Actual
Budget Fiscal Year 2026 Page 104 of 108 Updated as of 8/3/26

Page 1219 of 2528 ends

(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1
Trees
The cost recovery payment amount for damage to a City tree is based on a reasonable estimated amount of time for City personnel to respond and coordinate the tree removal and replacement. The billed amount shall also include any third party removal and replacement costs, material costs (tree, mulch etc.) and may include other incurred costs. Although not typically the case, if the removal and replacement work is performed by City personnel, the total actual cost for such labor will be included as well.

City Response/
Standard Costs Coordination
City Labor Cost $544.51
Vehicle Cost $14.10
$558.61
Add:

Tree Removal/Replacement Actual
Materials Actual
Other Actual
Budget Fiscal Year 2026 Page 105 of 108 Updated as of 8/3/26

Page 1220 of 2528 ends

(CITY ATTY 03-25)
LORETTAA\58000.01001\50182475.1

2. Other City Property - Cost Recovery Payment Amounts.

For damage to all other City property not otherwise set forth in this schedule, including, without limitation, park lights, traffic signals and electric poles, the City shall have the authority to pursue and collect the total actual costs incurred by the City related to any incident involving such damages.

3. Annual Increases.

As provided for in Section 4 of the Resolution, the amounts included in this Cost Recovery Payment Schedule shall increase on July 1 of each year (beginning in 2017) by the greater of: (1) four percent (4%); or (2) the annual percentage increase in the Consumer Price Index, all Urban Consumers, for the Los Angeles-Orange-Riverside County Area, as determined by the United States Department of Labor Statistics, or its successor, measured using the most recent March to March data.

Budget Fiscal Year 2026 Page 106 of 108 Updated as of 8/3/26

Page 1221 of 2528 ends

Violation Penalty Notice 1st Penalty
CMC 10.20.020 No Vehicles Standing w/in any Parkways $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040 No Parking $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040(f) Traffic Hazard $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040(h) Parked w/in 20' of Crosswalk $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.040(i) Parked w/in 20' of Stop Sign $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.050 Parked Over 72 Hours $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.150 Alley Parking $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.160 Designated Fire Lane $85.00 + 22 days N + 15 days + $25.00 CMC 10.20.200 Vehicle for Sale $90.00 + 22 days N + 15 days + $25.00 CMC 10.20.210 No Parking (Private Property Posted) $50.00 + 22 days N + 15 days + $25.00 CMC 10.20.220 Obstructing Traffic $75.00 + 22 days N + 15 days + $25.00 CMC 10.20.240 Unlawful w/in Public Park $100.00 + 22 days N + 15 days + $25.00 CMC 10.20.250(a) Oversized Vehicle Parking $205.00 + 22 days N + 15 days + $25.00 CMC 10.20.250(b) Non Motorized Vehicle Parking $75.00 + 22 days N + 15 days + $25.00 CMC 10.20.260(a) Parked in Front Yard $75.00 + 22 days N + 15 days + $25.00 CMC 10.22.070 Permit Parking Only $45.00 + 22 days N + 15 days + $25.00 CMC 10.24.010 Green Curb Parking (Time Restricted) $45.00 + 22 days N + 15 days + $25.00 CMC 10.24.060 No Stopping $45.00 + 22 days N + 15 days + $25.00 CMC 10.24.080 Commercial Vehicle Prohibition $200.00 + 22 days N + 15 days + $25.00 CMC 10.24.090 Parked Along Painted Curb $45.00 + 22 days N + 15 days + $25.00 CMC 10.26.020 Restricted Parking $50.00 + 22 days N + 15 days + $25.00 CMC 10.26.020(d) Street Sweeping $55.00 + 22 days N + 15 days + $25.00 CMC 10.28.050 Handicapped Parking $350.00 + 22 days N + 15 days + $25.00 VC 21211(a) Blocking Bike Path $60.00 + 22 days N + 15 days + $25.00 VC 22500(a) Parking w/in an Intersection $45.00 + 22 days N + 15 days + $25.00 VC 22500(b) Parking on Crosswalk $45.00 + 22 days N + 15 days + $25.00 VC 22500(c) Parking Between Safety Zone $45.00 + 22 days N + 15 days + $25.00 VC 22500(d) Parked w/in 15' of Fire Station Driveway $45.00 + 22 days N + 15 days + $25.00 VC 22500(e) Blocking Driveway $45.00 + 22 days N + 15 days + $25.00 VC 22500(f) Parked on Sidewalk $45.00 + 22 days N + 15 days + $25.00 VC 22500(g) Parked on Highway Excavation $45.00 + 22 days N + 15 days + $25.00 VC 22500(h) Double Parking $45.00 + 22 days N + 15 days + $25.00 VC 22500(i) Parked at Bus Stop $150.00 + 22 days N + 15 days + $25.00 VC 22500(j) Parked in Tunnel $45.00 + 22 days N + 15 days + $25.00 VC 22500(k) Parked on Bridge $45.00 + 22 days N + 15 days + $25.00 VC 22500(l) Blocking Wheel Chair Ramp $350.00 + 22 days N + 15 days + $25.00 VC 22502(a) Parked 18" from Curb $45.00 + 22 days N + 15 days + $25.00 VC 22502(a) Parked Wrong Direction $45.00 + 22 days N + 15 days + $25.00 VC 22514 Parked w/in 15' from Fire Hydrant $60.00 + 22 days N + 15 days + $25.00 VC 4000(a)(1) No Registration $105.00 + 22 days N + 15 days + $25.00 VC 4463(a)(1) False Tabs $105.00 + 22 days N + 15 days + $25.00 VC 5200(a) Display of License Plates $90.00 + 22 days N + 15 days + $25.00 VC 5200(a) No Front License Plate $90.00 + 22 days N + 15 days + $25.00 VC 5204 Display of Tabs $90.00 + 22 days N + 15 days + $25.00 VC 22500(N) - W/in 20FT of veh approach of crosswalk $50.00 + 22 days N + 15 days + $25.00

EXHIBIT A
Corona Police Department
Parking Violation Penalty Schedule
Budget Fiscal Year 2026 Page 107 of 108 Updated as of 8/3/26

Page 1222 of 2528 ends

Taxes and Regulatory Fees Under Prop. 26
3URSDGGVDQHZGHILQLWLRQRI³WD[´LQWRWKH&DOLIRUQLD&RQVWLWXWLRQSURYLGLQJWKDWDQ\JRYHUQPHQW LPSRVHGFKDUJHOHY\RUH[DFWLRQRIDQ\NLQGLVDWD[XQOHVVLWIDOOVLQWRRQHRIDVHYHQH[SUHVV H[HPSWLRQV
Local Government Taxes under Prop. 26.7KHPHDVXUHDGGVWKHIROORZLQJODQJXDJH LGHQWLILHGE\

LWDOLFV
WR$UWLFOH;,,,&RIWKH&DOLIRUQLD&RQVWLWXWLRQ
DSRUWLRQRI3URSJRYHUQLQJWD[HV


SECTION 1 (e) As used in this article, “tax” means any levy, charge or exaction of any kind imposed by a local government, except the following:
(1) A charge imposed for a specific benefit conferred or privilege granted directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of conferring the benefit or granting the privilege.

Specific Benefit Exemption. ([DPSOHV
SODQQLQJSHUPLWVSROLFHSHUPLWVVWUHHWFORVXUH
SHUPLWVSDUNLQJSHUPLWVLQUHVWULFWHG]RQHVVRPHIUDQFKLVHV²WRWKHH[WHQWWKHSULYLOHJHLV QRWSURYLGHGWRWKRVHQRWFKDUJHGDQGWKHIHHGRHVQRWH[FHHGWKHORFDOJRYHUQPHQW¶V UHDVRQDEOHFRVWVRIVHUYLFHWRWKHIHHSD\HU
(2) A charge imposed for a specific government service or product provided directly to the payor that is not provided to those not charged, and which does not exceed the reasonable costs to the local government of providing the service or product.

Specific Government Service or Product Exemption. ([DPSOHV XVHUIHHVLQFOXGLQJIRU
XWLOLWLHV
PRVWUHWDLOZDWHUVHZHUWUDVKDQGVWRUPZDWHUIHHVDUHH[HPSWXQGHUH[HPSWLRQ GLVFXVVHGEHORZ
SXEOLFUHFRUGVFRS\LQJIHHV'8,HPHUJHQF\UHVSRQVHIHHVHPHUJHQF\ PHGLFDODQGDPEXODQFHWUDQVSRUWVHUYLFHIHHVUHFUHDWLRQFODVVHVZHHGDEDWHPHQWWRWKH H[WHQWWKDWWKHVHUYLFHRUSURGXFWSULYLOHJHLVQRWSURYLGHGWRWKRVHQRWFKDUJHGDQGWKHIHH GRHVQRWH[FHHGWKHUHDVRQDEOHFRVWVRIVHUYLFHWRWKHORFDOJRYHUQPHQW (3) A charge imposed for the reasonable regulatory costs to a local government for issuing licenses and permits, performing investigations, inspections and audits, enforcing agricultural marketing orders, and the administrative enforcement and adjudication thereof.

Permits and Inspections Exemption. ([DPSOHV
SHUPLWVIRUUHJXODWHGFRPPHUFLDODFWLYLWLHV

HJGDQFHKDOOELQJRFDUGURRPFKHFNFDVKLQJWD[LFDESHGGOHUVFDWHULQJWUXFNV PDVVDJHSDUORUILUHDUPGHDOHUVHWF

ILUHKHDOWKHQYLURQPHQWDOVDIHW\SHUPLWV
SROLFH
EDFNJURXQGFKHFNV
SHWOLFHQVHV
ELF\FOHOLFHQVHV

ZKHUHWKHFRVWVGRQRWH[FHHGWKH
UHDVRQDEOHUHJXODWRU\FRVWVWRWKHORFDOJRYHUQPHQWIRULVVXLQJWKHOLFHQVHRUSHUPLW

(4) A charge imposed for entrance to or use of local government property or the purchase rental or lease of local government property.

Local Government Property Exemption. ([DPSOHV
IDFLOLW\UHQWDOIHHVURRPUHQWDOIHHV
HTXLSPHQWUHQWDOIHHVRQDQGRIIVWUHHWSDUNLQJWROOVIUDQFKLVHSDUNHQWUDQFHPXVHXP DGPLVVLRQ]RRDGPLVVLRQWLSSLQJIHHVJROIJUHHQIHHVHWF (5) A fine, penalty, or other monetary charge imposed by the judicial branch of government or a local government as a result of a violation of law, including late payment fees, fees imposed under administrative citation ordinances, parking violations, etc.

Penalty for Illegal Activity Exemption. ([DPSOHV
SDUNLQJILQHVFRGHHQIRUFHPHQWIHHV
DQGSHQDOWLHVODWHSD\PHQWIHHVLQWHUHVWFKDUJHVDQGRWKHUFKDUJHVIRUYLRODWLRQRIWKHODZ (6) A charge imposed as a condition of property development.

Property Development Exemption. ([DPSOHV
SODQQLQJ&(4$DQGEXLOGLQJSHUPLWIHHV
FRQVWUXFWLRQSHUPLWVGHYHORSPHQWLPSDFWIHHVIHHVLPSRVHGWRUHPHG\WKHHIIHFWVRIWKHIHH SD\RU¶VRSHUDWLRQWKDWDUHLPSRVHGDVDFRQGLWLRQRISURSHUW\GHYHORSPHQW LQFOXGLQJ&(4$
PLWLJDWLRQPHDVXUHVUHTXLULQJWKHSD\PHQWRIPRQH\

(7) Assessments and property related fees imposed in accordance with the provisions of Article XIII D.
3URSRVLWLRQ

Prop. 218 Exemption.([DPSOHV
DVVHVVPHQWVRQUHDOSURSHUW\IRUVSHFLDOEHQHILW
FRQIHUUHGIHHVLPSRVHGXSRQDSDUFHORUDSHUVRQDVDQLQFLGHQWRISURSHUW\RZQHUVKLSDQG IHHVIRUDSURSHUW\UHODWHGVHUYLFHVXFKDVPDQ\UHWDLOZDWHUDQGVHZHUIHHV Budget Fiscal Year 2026 Page 108 of 108 Updated as of 8/3/26

Page 1223 of 2528 ends

August 5, 2026
Bruce Foltz, Finance Director
Tony Thrasher, Willdan Financial Services
Priti Patel, Willdan Financial Services

Page 1224 of 2528 ends

The Ask
That the City Council discuss and provide
direction on the Citywide Master Fee
Recovery Schedule.

Page 1225 of 2528 ends

Comprehensive User Fee Study
Background/Project History, Objectives, Methodology, Process, Results

Page 1226 of 2528 ends

Tony Thrasher
Priti Patel

Page 1227 of 2528 ends

• A “user fee” is a charge for service provided by a
governmental agency to a public citizen or group
• California State Law, specifically Government Code
66014(a), stipulates that user fees charged by local
agencies “…may not exceed the estimated reasonable
cost of providing the service for which the fee is
charged…” Page 1228 of 2528
Non-Market / Time-Based Fees
• Level of staffing, staffing costs, time allocation, and operating costs
• Goal is to generally recover 100% of costs except as
limited by law or Council direction
Market Fees
• Policy and market conditions

Page 1229 of 2528 ends

• Primary goal of a User Fee Study is to determine the
“reasonable” full cost of providing services or programs • Comprehensive fee study every 5 years
• Willdan hired to conduct citywide time-based fee analysis update that started in mid-2025

Page 1230 of 2528 ends

Fees analyzed:

Analysis conducted:
• Fee-for-service activities
• Based on FY 2026 Budget
• Does not include Development Impact Fees, Utility Rates, Taxes, or Traffic Violations • Airport
• Building
• City Clerk
• Community Services
• Development Services
• Finance
• Fire
• General Services
• Human Resources
• Legal & Risk Management
• Legal & Risk Management
• Planning
• Police & Animal Services
• Public Works
• Utilities

Page 1231 of 2528 ends

• Determine full cost of providing services or programs • Review fee schedules based on service delivery
• Identify potential new fees (not currently collected) • Using fully-burdened rates, calculate full cost recovery • Assess levels of current cost recovery and evaluate needs for adjustments
• Provide estimated revenue projections based on proposed adjustments
• Ensure compliance with state law governing user fee cost recovery

Page 1232 of 2528 ends

The analysis to determine the cost of providing fee-for-service activities is comprised of two basic elements:

1. Hourly rates of staff and/or contractors providing the service

2. Average time required to provide the service
The product of the fully burdened hourly rate calculation and the time spent yields the cost of providing the service

Page 1233 of 2528 ends

• Costs included in fully burdened hourly rates
• Salary & Benefits
• Services and supply costs
• Indirect support costs
• System and maintenance costs
• Hourly rates structured to account for direct work hours Salary &
Benefits
Productive
Hours
Salary &
Benefit
Rate
Direct and
Indirect
Overhead
Fully
Burdened
Hourly
Rate

Page 1234 of 2528 ends

Reasonable Cost
of Providing
Service
Fee for Service
• Individual fees determined
from 0% - 100% cost
recovery
• Subsidized fees are funded
by unobligated General Fund
revenues
• May impact fund availability
for community benefit
programs/ services
• Funded fees promote proper
staffing and quality service to

Page 1235 of 2528 ends

Tony Thrasher
Priti Patel

Page 1236 of 2528 ends

• Increases and decreases in fees vary by department, based on staffing changes and combination of fees
• Overall estimated annual revenue increase of $1,246,854 • Projection based on FY25 volume
• In future years, revenue will vary based on actual service demand. • Projections are based solely on the fee changes included in this update

Page 1237 of 2528 ends
Page 1238 of 2528 ends

User Fee Study Process
Our Timeline
Project Kickoff /
Staff Interviews
September 2025
Data
Collection
November 2025
Analysis / 1st Draft
Results
April 2026
Analysis / Final Draft
Results
May 2026
Development
Community Meeting
June 2026
Recommendations to
City Council
August 2026
Fees go into Effect
(if approved by Council)
October 2026

Page 1239 of 2528 ends

The Ask
That the City Council discuss and provide
direction on the Citywide Master Fee
Recovery Schedule.

Page 1240 of 2528 ends

(951) 279-3532
[email protected]
www.CoronaCA.gov

Page 1241 of 2528 ends

DATE: 08/05/2026
TO: Honorable Mayor and City Council Members
FROM: Community Services Department
2026-132

REQUEST FOR CITY COUNCIL ACTION
SUBJECT:

ORDINANCE AMENDING CHAPTERS 9.20 AND 12.24 OF THE CORONA MUNICIPAL

CODE REGARDING SPECIAL EVENTS AND ADOPTION OF NEW USER GROUPS

CLASSIFICATION
EXECUTIVE SUMMARY:

Staff recommend that the City Council approve the first reading of Ordinance No. 3433, amending chapters 9.20 and 12.24 of the Corona Municipal Code (CMC). The proposed amendments clarify existing code language, designate a single primary point of contact for the special event permit process, and establish standardized user group classifications to ensure consistent application review and evaluation across all City departments.

RECOMMENDED ACTION:

That the City Council introduce, by title only, and waive full reading of Ordinance No. 3433 amending Chapter 9.20 (Special Events) and Chapter 12.24 (Parks and Recreation Areas) of the Corona Municipal Code to codify applicant group priority classifications, to rename Chapter 9.20, to change the special event permitting authority from the Police Department to the Community Services Department, and to make other clarifying updates.

BACKGROUND & HISTORY:

The City of Corona has historically allowed individuals, organizations, and businesses to rent public facilities and spaces for special events. The Corona Municipal Code (CMC)

Page 1242 of 2528 ends

provides the authority for regulating these uses and establishes the framework for permitting, oversight, and enforcement.

Over time, the City’s policies and facility guidelines have been updated to meet practical operational needs, provide application timelines, ensure appropriate insurance and security, and keep events within capacity limits. Larger or higher-impact events, such as those with amplified sound, street closures, or large crowds, also require added coordination among multiple City departments to ensure safety and compliance. When necessary, the City may deny, suspend, or revoke permits to protect public welfare and keep facilities available for appropriate use.

The City uses a tiered fee and user-group classification system, outlined in the Master Fee Schedule, to balance broad community access with responsible cost recovery. This system aligns fees with the level of public benefit and the resources required to support each type of use. Currently, departments use different qualifiers when determining user-group classifications, which can lead to inconsistent interpretations and fee assessments. Standardizing these qualifiers in the CMC will give all departments a shared set of definitions and criteria, making the process clearer for applicants and improving consistency and alignment across the organization.

Due to increasing demand for parks, community centers, and other public venues, updates to the CMC and existing special event procedures are needed to ensure equitable, efficient, and safe use of City assets.

ANALYSIS:

The City’s special event permitting process is guided by the CMC, primarily Chapters 9.20 and 12.24, which currently require groups of 25 or more to obtain a special event permit through the Police Department and follow all applicable procedural requirements. As part of the CMC updates, staff worked with the City Attorney’s office to review these chapters to clarify language, remove outdated provisions, and improve consistency so the code better reflects how the City manages special events today.

While many of the updates are minor cleanup and clarifications, several changes are more significant. The ordinance now designates the City of Corona Community Services Department, rather than the Police Department, as the primary point of contact for special event rentals, giving applicants a clear, centralized starting point while allowing Police, Fire, Public Works, and other City departments to continue reviewing applications within their respective areas of responsibility. This amendment aligns the CMC with current business practices without changing the City's interdepartmental review process.

In addition, the ordinance authorizes administrative policies to establish detailed submittal requirements and operational standards, rather than listing every application requirement within the code. The City’s administrative policy governing special events addresses these requirements and establishes standardized procedures for special event applications and administration, outlining the required documentation, submittal standards, and procedural steps for obtaining a special event permit. By aligning the code

Page 1243 of 2528 ends

with the policy’s defined requirements, such as insurance, safety plans, site plans, and operational details, the permitting process becomes more consistent, transparent, and easier for applicants to navigate. This alignment ensures that both the ordinance and the administrative policy support a unified process for reviewing and approving special event applications.

With the proposed updates to the CMC, user-group classifications will now be formally included in Chapters 9.20 and 12.24. Codifying the user-group categories ensures that all departments apply the same definitions and criteria when reviewing applications, helping standardize fees, support consistent decision-making, and improve transparency for applicants. This addition strengthens alignment between the Master Fee Schedule, the CMC, and the City’s operational practices.

The user group classifications are listed below. It is important to note that Group II (Everyone Plays Youth Sports Non-Profit Organizations) applies only to youth sports organizations for athletic facility allocations and does not qualify for special event rentals.

User Group Description
Group I – Co-Sponsored
/ Governmental Users
City-sponsored or co-sponsored activities, CNUSD, and
other approved government agencies. Non-City groups
pay any direct costs.

Group II – Everyone
Plays Youth Sports
Non-Profits
Corona-based youth sports non-profits with at least 65% resident participation and an “everyone plays” model. Must provide required non-profit documentation and residency verification.

Group III – Resident
Non-Profit Groups
Corona-based non-profit organizations with documentation showing good standing and at least one year of
establishment.

Group IV – Resident
For-Profit Groups /
Non-Resident Non-Profit
Groups
Resident for-profit groups with a Corona address or
non-profit groups located outside city limits. Non-profits must provide required documentation.

Group V – Non-Resident
Individuals & For-Profit
Groups
Individuals or for-profit groups located outside Corona city limits.

The proposed ordinance modernizes Chapters 9.20 and 12.24 by updating outdated code language, aligning the CMC with current operational practices and administrative policies, and establishing consistent applicant priority classifications. These revisions improve transparency, provide applicants with a clear point of contact, support consistent permit administration across City departments, and create a more efficient and user-friendly special event permitting process while maintaining appropriate public health, safety, and operational review standards.

Page 1244 of 2528 ends

FINANCIAL IMPACT:

The City’s special event rental program is designed so that the cost of using City-owned facilities and public spaces is covered by the applicant. All fees and deposits are established in the Master Fee Schedule, ensuring that staffing, utilities, maintenance, and administrative needs related to rentals are fully reimbursed. As a result, there is no direct cost to the City or impact on the General Fund. Liability insurance requirements provide additional protection by covering potential property damage, non-compliance, or liability claims. Revenue from rentals is tracked within the City’s operating budget and supports ongoing maintenance and improvements to public facilities.

ENVIRONMENTAL ANALYSIS:

This action is exempt pursuant to Section 15061(b)(3) of the Guidelines for the California Environmental Quality Act (CEQA), which states that a project is exempt from CEQA if the activity is covered by the common-sense exemption that CEQA applies only to projects that have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. This action amends Chapters 9.20 and 12.24 of the Corona Municipal Code to clarify the special event permitting process, and there is no possibility that approving this ordinance will have a significant effect on the environment. Therefore, no environmental analysis is required.

PREPARED BY: MONIQUE LEON, RECREATION SERVICES MANAGER
REVIEWED BY: DONNA FINCH, COMMUNITY SERVICES DIRECTOR
ATTACHMENTS:

1. Exhibit 1 – Ordinance Amending Corona Municipal Code Chapters 9.20 and 12.24 (Redline)

2. Exhibit 2 – Ordinance Amending Corona Municipal Code Chapters 9.20 and 12.24 (Clean)

3. Exhibit 3 – Special Events Administrative Policy

4. Exhibit 4 – Presentation

Page 1245 of 2528 ends

]
DEAND\14000.15002\10322752.5
ORDINANCE NO. 3433

AN ORDINANCE OF THE CITY OF CORONA,
CALIFORNIA AMENDING CHAPTER 9.20 (SPECIAL
EVENTS) AND CHAPTER 12.24 (PARKS AND

RECREATION AREAS) OF THE CORONA MUNICIPAL

CODE TO CODIFY APPLICANT GROUP PRIORITY
CLASSIFICATIONS, TO RENAME CHAPTER 9.20, TO

CHANGE THE SPECIAL EVENT PERMITTING

AUTHORITY FROM THE POLICE DEPARTMENT TO

THE COMMUNITY SERVICES DEPARTMENT, AND TO

MAKE OTHER CLARIFYING UPDATES
WHEREAS, Chapter 9.20 of the Corona Municipal Code (“CMC”) governs the permitting process for certain special events (aka Assemblages and Parades); WHEREAS, CMC 9.20 currently requires a special event permit to be obtained from the Police Department;
WHEREAS, the City Council would like to change the permitting authority from the Police Department to the Community Services Department, as well as to make other clarifying revisions to CMC 9.20;
WHEREAS, Chapter 12.24 of the CMC governs Parks and Recreation Areas within the City; and
WHEREAS, the City Council would like to codify within CMC 12.24 the applicant group priority classifications used to determine applicant group priorities and related issues (including fee amounts) for special events, reservations or rentals of city facilities (including pursuant to the city’s field allocation policy), as well as make other related clarifying revisions to CMC 12.24.

NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF CORONA,
CALIFORNIA DOES ORDAIN AS FOLLOWS:

SECTION 1. New CMC 9.20 (Special Events). Chapter 9.20 (Assemblages and Parades) of the CMC is hereby revised in its entirety to read as indicated in Exhibit “A” attached hereto and incorporated herein by reference.

SECTION 2. New CMC 12.24 (Parks and Recreation Areas). Chapter 12.24 (Parks and Recreation Areas) of the CMC is hereby revised in its entirety to read as indicated in Exhibit “B” attached hereto and incorporated herein by reference.

REDLINE

Page 1246 of 2528 ends

2 DEAND\14000.15002\10322752.5
SECTION 3. The Mayor shall sign this Ordinance and the City Clerk shall attest thereto and shall within fifteen (15) days of its adoption cause it, or a summary of it, to be published in a general circulation newspaper published and circulated in the City of Corona.

This Ordinance shall take effect and be in force on the 30th day after its adoption.

ADOPTED this 19th day of August, 2026.
_________________________________________
Mayor of the City of Corona, California
ATTEST:
_________________________________________
City Clerk of the City of Corona, California

REDLINE

Page 1247 of 2528 ends

3 DEAND\14000.15002\10322752.5

CERTIFICATION
I, SYLVIA EDWARDS, City Clerk of the City of Corona, California, do hereby certify that the foregoing Ordinance was regularly introduced at a regular meeting of the City Council of the City of Corona, California, duly held the 5th day of August, 2026, and thereafter at a regular meeting thereof held on the 19th day of August, 2026, it was duly passed and adopted by the following vote of the Council:

AYES:

NOES:

ABSENT:

ABSTAINED:

IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of Corona, California, this 19th day of August, 2026. _________________________________________
City Clerk of the City of Corona, California

REDLINE

Page 1248 of 2528 ends

4 DEAND\14000.15002\10322752.5
EXHIBIT “A”
CHAPTER 9.20

ASSEMBLAGES AND PARADES

SPECIAL EVENTS
Sections

9.20.010 Special event - Defined.

9.20.020 Permit - Required.

9.20.030 Permit – Application.

9.20.040 Permit - Meetings, assemblies - Time of issuance.

9.20.050 Permit - Meetings, assemblies - Granting.

9.20.060 Permit - Parade - Contents.

9.20.070 Permit - Distribution of copies.

9.20.080 Permittee - Duties.

9.20.090 Permit - Possession.

9.20.100 Permit - Denial - Cause.

9.20.110 Permit - Appeal - Waiver of filing requirement.

9.20.120 Special events - Public conduct.

9.20.130 Parades - Vending license.

9.20.140 Violation - Penalties.

9.20.010 Purpose, Definitions and Administrative Policy.

9.20.020 Applicant Group Priority Classifications

9.20.030 Permit - Required.

9.20.040 Permit - Application.

9.20.050 Permit - Application and Issuance Timing.

9.20.060 Permit – Conditions and Restrictions.

9.20.070 Permit – Criteria for Granting & Denial.

9.20.080 Permit – Contents.

9.20.090 Permit – Distribution of Copies.

9.20.100 Permit – Possession at Event.

9.20.110 Permit – Appeal of Denial of Permit for Parade.

9.20.120 Permittee – Duties.

9.20.130 Public Conduct.

9.20.140 Vending.

9.20.150 Violation – Penalties.

9.20.010 Special event - definedPurpose, Definitions and Administrative Policy.

REDLINE

Page 1249 of 2528 ends

5 DEAND\14000.15002\10322752.5
(A) Purpose. The purpose of this chapter is to provide the process by which, as well as the conditions under which, a person must obtain a permit from the department for a special event.
(B) Definitions. As used in this chapter, the terms noted below shall have the following meanings.
(1) “Department” means the city of corona community services department. (2) “Director” means the director of the community services department or their designee.
(3) “Open to the public” means an event which is accessible to everyone and thus not restricted to specific people, specific invitees, or a specific group. (4) “City property” means any city owned property in the city, including, but not limited to, public parks (including recreation buildings/facilities, amenities and/or equipment), public streets, public alleyways, public trails, public access ways, public passageways, public rights-of-way, publicly owned landscaped areas or greenbelts, public sidewalks, public libraries, public community centers, public senior centers, public parking lots, and other city owned or controlled public facilities and properties. (5) “Special event” shall mean any meeting, assembly, parade or other event which meets any of the following:
(1) Is(a) City Property. Any event which is open to the public and proposed to be conducted in or upon the public streets, highways, or parks of the citycity property;
(2) Is(b) CMC 12.24 Parks Special Event. Any event which is open to the public, is proposed to be conducted in or upon the parks of the city, and meets the requirements for a special event provided for in Chapter 12.24 of this code; (3) Involves(c) Alcoholic Beverages. Any event which involves the sale, consumption, or possession of alcoholic beverages withinand is proposed to be held on any city property or city facilities authorized to be used for such purposes pursuant to § 9.22.020 of this code; or
(4) (d) Permit Otherwise Required. Is an event which otherwise requires a special event permit pursuant to a city resolution or ordinance, including any provision of this code.
(C) Administrative Regulations. In order to implement and enforce the provisions of this chapter, the City Manager is directed to adopt additional rules and regulations within an administrative policy that are not in conflict with this chapter or any other provision of this code.

REDLINE

Page 1250 of 2528 ends

6 DEAND\14000.15002\10322752.5

9.20.020 Applicant Group Priority Classifications.

In determining applicant group priorities and related issues, the director shall follow the applicant group priority classifications established pursuant to Section 12.24.015 of this code; provided, however, that Group II (Everyone Plays Youth Sports Non-Profit Organizations) shall not be applicable to this chapter and thus shall not have priority.

9.20.030 Permit - Required.

No person shall conduct a special event unless and until a permit has been obtained from the Chief of Policecommunity services department or, as further provided for in this chapter, from the City Councilcity council.

9.20.030040 Permit - Application.
(A) Application. Any person desirous of conductingwho wishes to conduct a special event shall apply to the Chief of Policecommunity services department for a permit at least 20 days in advance ofwithin the date of the proposed special event.time frames provided for in Section 9.20.050 below. The application for the permit shall be made in writing on a form approved by the Chief of Police. Feesdirector. Application and other fees, as approved by resolution of the city council, shall be paid at this time. The charges for personnelupon submission of the application or as otherwise expressly required by city administrative policy. (B) Conflicting Applications. If two or more applications for a special event are submitted which conflict in time and location, as determined by the director, the director shall first consider the application with the higher group priority classification as provided for in Section 9.20.020 above. If the applicants are within the same group priority classification, then the application that was first received shall be paid prior to the event and based on city "billable rates."considered first. The applicant later in time may select a different time and/or location, and the time period for issuance of such altered permit application shall reset. If the applicant does not wish to select a different time and/or location, their application shall be deemed to be abandoned and not denied.
(B) (C) Information Required. In order that adequate arrangements may be made for the proper policing and administration of the special event, the application shall contain thesuch information relating as the department may require in the administrative policy adopted pursuant to Section 9.20.010 above. following information:
(1) Applicant Contact Information. The name, address, email, and telephone number of the person requesting the permit. If the special eventSpecial Event is proposed to be conducted for,by or on behalf of or by an organization, the Applicant shall also provide the name, address and telephone number of the headquarters of the organization, as well as the name, address, email, and telephone number of the authorized head of such organization;. (2) (2) Special Event Management Contact Information. The name, address and telephone number of the person who will be responsible for management of the

REDLINE

Page 1251 of 2528 ends

7 DEAND\14000.15002\10322752.5
special event;. The Applicant shall provide such contact information for the person who will be responsible for management of the event as is requested by the Department, including, but not limited to, their name, address, email, and telephone number. (3) Purpose. The purpose of the special event;.
(4) Date(s). The proposed date when(s) of the special event is to occur;. (5) Hours. The proposed hours of the special event;.
(6) Vendors License. A statement that either the applicant shall comply with § 9.20.120140 of this chapter and accept, process and administer the collection of fees for applications for a vending license at the special event or that the applicant requests the city to waive applicant’s compliance with § 9.20.130;.
(7) Parades. If the special event is a parade:
(a) The proposed parade route.
(b) The approximate number of persons who and, as well as the approximate number and kind of vehicles and animals which will constitute the parade and the route of the parade;proposed to participate.
(bc) The location of the assembly area of the parade;.
(c) The location of the dispersal area of the parade;.
(d) The plans for the assembly and dispersal of the parade, including the times thereof;.
(e) A statement as to whether the parade will occupy all or only a portion of the public property, including streets, proposed to be traversed;used for the parade route, assembly area, and dispersal area.
(f) If the dispersal area of the parade is located in another city, the location of such dispersal area, and if. If a paradepermit has been issued by such city, applicant shall provide a copy of such permit. If a permit has not been issued by such other city, applicant shall specify an alternate route and alternate dispersal area in the city;. (8) Such other information relating to the special event as the Chief of Police may require. If there is no prior application for a special event at the time and place, the Chief of Police may issue a permit granting the application, subject to conditions and restrictions necessary to protect the public health, safety, welfare, comfort and convenience. The applicant for the special event permit shall be notified in writing of the action of the Chief of Police in granting or denying the permit at least 13 days prior to the date of the proposed special event. If the application is denied, the written notice of the denial shall set forth the reasons therefor.

REDLINE

Page 1252 of 2528 ends

8 DEAND\14000.15002\10322752.5
(8) Other Information. Such other information relating to the special event as the community services department may require.

9.20.040050 Permit - Meetings, assemblies - Time of issuanceApplication and Issuance Timing.
(A) Permit for Parades. Any person desiring to hold a meeting or an assembly, other than a parade, in or upon the public streets, sidewalks and highwaysparade shall make application for such meeting or assembly with the Chief of Police at least 48 hourstwenty (20) calendar days in advance of the date of the proposed parade. The director shall thereafter issue an approval or denial of the permit at least thirteen (13) calendar days in advance of the date of the proposed meeting or assembly, specifying the time and place thereof, the name of the person or organization desiring the permit and such other information as may be required by the Chief of Police in order to enable him or her to parade.
(B) Permit for Other Events. Any person desiring to hold an event other than a parade shall make adequate arrangements, as circumstances may require, for the proper policingapplication at least two (2) business days in advance of the proposed meeting or assemblyevent. The director shall thereafter issue an approval or denial of the permit at least one (1) calendar day in advance of the date of the event.

9.20.050 Permit – Meetings, assemblies – Granting.

The Chief of Police shall forthwith issue a permit granting the application subject to the conditions and restrictions necessary to protect the public health, safety, welfare, comfort and convenience unless a prior application for the time and place has been made, in which event another time and place may be selected; and upon the selection of the alternative time and place by the applicant, the Chief of Police shall forthwith grant a permit therefor.

9.20.060 Permit – Parade – Contents.

Each parade permit shall state the following information:
(A) Starting time and date;
(B) Minimum and maximum speed;
(C) Maximum interval of space to be maintained between the units of the parade;
(D) The portions of the streets to be traversed that may be occupied by the parade;
(E) The maximum length of the parade in miles or fractions thereof;

REDLINE

Page 1253 of 2528 ends

9 DEAND\14000.15002\10322752.5
(F) Such other information and conditions as the Chief of Police shall find necessary for the enforcement of this chapter.

9.20.070 Permit – Distribution of copies.

Immediately upon the issuance of a special event permit, the Chief of Police shall send a copy thereof to the following:
(A) The City Manager;
(B) The City Attorney;
(C) The Fire Chief;
(D) The Director of the Department of Public Works.

9.20.080 Permittee – Duties.

A permittee under this chapter shall comply with all permit directions and conditions and with all applicable laws and ordinances.

9.20.090 Permit – Possession.

The special event chairperson or other person responsible for the special event shall carry the permit upon his or her person during the conduct of the special event.

9.20.100 Permit – Denial – Cause.

The Chief of Police may refuse to issue a permit for a special event when in his or her judgment the conditions of vehicular and pedestrian traffic or the effect upon stores, offices and other places of business or upon residents or hospitals, churches, institutions located in the vicinity where the special event is proposed to be conducted, all considered in relation to the safety, comfort and convenience of the public generally shall so warrant.

9.20.110 Permit – Appeal – Waiver of filing requirement. (A) Upon denial by the Chief of Police of an application made in pursuance of §§

9.20.030 through 9.20.040, the applicant may appeal from the determination of the Chief of Police within two days thereafter to the (C) Appeal to City Council by filing his or her application with the City Clerk, who shall set the appeal for hearing by the Council at its next meeting. Upon such appeal, the Council may reverse, affirm or modify in any regard the determination of the Chief of Police. To carry out the judgment of the Council upon appeal, the Chief of Police shall be directed to act in conformity with the judgment of the Council. (B) for Parade Permits. In the event an application for a parade is not filed within the required time, as specified in §§ 9.20.020 throughSection 9.20.040, (A), the applicationapplicant may request a waiver of such requirement by the City Councilcity council at its next regular meeting, or at a special meeting which may be if there is sufficient time for the matter to be placed on the agenda in accordance with the Ralph M. Brown Act or other

REDLINE

Page 1254 of 2528 ends

10 DEAND\14000.15002\10322752.5
applicable law. Although not required, the matter may also be placed on the agenda of a special meeting, if one is called prior thereto by the City Council to consider such matter, and the City Council, if it in accordance with the Ralph M. Brown Act or other applicable law. If a waiver request is heard by the city council, and if the city council finds that unusual circumstances and in the exercise of its sound discretion,justified the applicant’s failure to meet the stated time requirement and that the director will have adequate time to responsibly consider the application, the city council may waive suchthe time requirement and require the director to consider the application.

9.20.060 Permit – Conditions and Restrictions.
(A) Conditions and Restrictions. In granting a permit application, the director may require any and all conditions and restrictions they believe are necessary to protect the public health, safety, welfare, comfort, and convenience. The applicant shall comply with all such conditions and restrictions.
(B) Insurance. All applicants and vendors shall provide such insurance required by the director.
(C) Parking Restrictions for Parades. The director, in conjunction with the chief of police and/or public works director, shall have the authority, when reasonably necessary, to prohibit or restrict the parking of vehicles on any city property, including streets, proposed to be used for the parade route, assembly area, and dispersal area. Signs shall be posted to such effect, and it shall be unlawful for any person to park or leave unattended any vehicle in violation thereof. No person shall be liable for parking on a street not posted in accordance with this chapter.

9.20.070 Permit – Criteria for Granting & Denial.
(A) Criteria for Granting. Unless a prior special event application has been made which conflicts in time and location, as determined by the director, the director shall issue a permit granting the application, subject to those conditions and restrictions authorized pursuant to Section 9.20.050(A) above.
(B) Criteria for Denial. The director may refuse to issue a permit for a special event only when they determine that the public health, safety, and welfare cannot be adequately protected, even with the implementation of reasonable conditions and restrictions, when considered in relation to the safety, comfort and convenience of the public generally.

9.20.080 Permit – Contents.
(A) Permit for Parades. Each parade permit shall include the following information:
(1) Starting time and date.
(2) Minimum and maximum speed.

REDLINE

Page 1255 of 2528 ends

11 DEAND\14000.15002\10322752.5
(3) Maximum interval of space to be maintained between the units of the parade.
(4) The portions of the city property, including streets, to be occupied for the parade route, assembly area, and dispersal area.
(5) The maximum length of the parade in miles or fractions thereof. (6) Any information required to be included in a permit for other events, as provided for in Section 9.20.060(B) below.
(7) Such other information and conditions as the director shall find necessary for the enforcement of this chapter.
(B) Permit for Other Events. Each permit for other events shall include the following information:
(1) Any conditions and restrictions required by the director. (2) Such other information and conditions as the director shall find necessary for the enforcement of this chapter.

9.20.090 Permit – Distribution of Copies.

Immediately upon the issuance of a special event permit, the director shall send a copy thereof to the city manager, police chief, fire chief, public works director, and any and all other department heads and city personnel who they believe are in need of the information for that event.
.

9.20.100 Permit – Possession at Event.

The person responsible for the management of the special event shall carry the permit upon their person during the special event.

9.20.110 Permit – Appeal of Denial of Permit for Parade.

Within two (2) calendar days of a denial by the director of an application for a parade, the applicant may appeal the determination to the city council at its next regular meeting, if there is sufficient time for the matter to be placed on the agenda in accordance with the Ralph M. Brown Act or other applicable law. Although not required, the matter may also be placed on the agenda of a special meeting, if one is called in accordance with the Ralph M. Brown Act or other applicable law. If an appeal is heard by the city council, they may reverse, affirm or modify in any regard the determination of the director, provided that the city council shall require any and all conditions and restrictions they believe are necessary to protect the public health, safety, welfare, comfort, and convenience, as provided for in Section 9.20.050(A) above. The applicant

REDLINE

Page 1256 of 2528 ends

12 DEAND\14000.15002\10322752.5
shall comply with all such conditions and restrictions. To carry out the judgment of the city council upon appeal, the director shall be directed to act in conformity with the judgment of the city council.

9.20.120 Special events – Public conductPermittee – Duties. (A)
A permittee under this chapter shall comply with all permit terms, including its conditions and restrictions, as well as with all applicable laws and ordinances.

9.20.130 Public conduct.
(A) All Events. No person shall unreasonably hamper, obstruct or, impede or interfere with any special event or with any person, vehicle or animal participating or used in such special event.
(B) Parades. No driver of a motor vehicle, motorcycle, bicycle or similar type vehicle shall drive between the vehicles, animals and/or persons comprising a parade, when such vehicles, animals and/or persons are in motion and are conspicuously designated as a parade. (C) The Chief of Police shall have the authority, when reasonably necessary, to prohibit or restrict the parking of vehicles along a highway, street, public right-of-way or part thereof constituting a part of the route of a parade. The Chief of Police shall post signs to such effect, and it is unlawful for any person to park or leave unattended any vehicle in violation thereof. No person shall be liable for parking on a street not posted in accordance with this chapter.

9.20.130 Parades – 140 Vending license.

(A) Each and every nonprofit organization which desires toIf a special event will have vendors who will sell or offer for sale any goods, wares or other merchandise, magazines, papers or periodicals oras well as persons or organizations who will canvas or solicit any other information related to their business or, occupation at any special event and, if or organization, then the applicant for the special event is a parade within 100 yards of any parade route on the day of the parade shall make written application and payment of an administration fee of $50 to the special event permittee. The application shall be made no later than ten days prior to the date of the special event and shall contain the following:

(1) The name, address and headquarters of the organization applying for the vending license;
(2) The names, addresses and telephone numbers of shall comply with any and all individuals executing the application on behalf of the organization; (3) A description of the type of goods, wares, merchandise, papers, magazines or periodicals to be sold or offered for sale and an outline of the method or methods by which such sales or offers for sale shall be made;

REDLINE

Page 1257 of 2528 ends

13 DEAND\14000.15002\10322752.5
(4) A statement to the effect that if a license is granted, it will not be used or represented in any way as an endorsement by the city or by any department or officer thereof. (B) Any application which complies with the requirements of this section shall be approved by the special event permittee.provided for in the administrative policy adopted pursuant to Section 9.20.010 above.

9.20.140150 Violation – Penalties.

Any person violating any of the provisions of this chapter is guilty of a misdemeanor.

REDLINE

Page 1258 of 2528 ends

14 DEAND\14000.15002\10322752.5
EXHIBIT “B”
CHAPTER 12.24

PARKS AND RECREATION AREAS
Sections

12.24.010 Statement of purpose; adoption of additional regulations.

12.24.015 Applicant group priority classifications.

12.24.020 Definitions.

12.24.030 Prohibited conduct.

12.24.040 Enforcement.

12.24.050 Reward for information.

12.24.060 Signs posted in public parks, recreation buildings/facilities and amenities.

12.24.070 Hours of operation.

12.24.080 Reservation of public parks, recreation buildings/facilities, amenities and equipment.

12.24.090 Denial of a reservation.

12.24.100 Special events permits.

12.24.110 Outdoor festivals.

12.24.120 Amplified sound.

12.24.130 Closure or restricted use of public parks, recreation buildings/facilities, amenities and equipment.

12.24.010 Statement of purpose; adoption of additional regulations.

The purpose of this chapter is to establish a comprehensive set of rules and regulations for use of public parks, recreation buildings/facilities, amenities and equipment in the city. TheIn order to implement and enforce the provisions of this chapter, the City Manager mayis directed to adopt additional rules and regulations within one or more administrative policies that are not in conflict with this chapter or any other chapter inprovision of this code.

12.24.015 Applicant group priority classifications.

In determining applicant group priorities and related issues (including fee amounts) for special events, reservations or rentals of city facilities (including pursuant to the city’s field allocation policy), the director shall follow the following applicant group priority classifications:
(A) Group I (Co-Sponsored Groups, City of Corona & Other Governmental Users). Activities conducted or sponsored by the City of Corona, including co-sponsored events, Corona-Norco Unified School District, or other approved governmental agencies. Non-City groups are required to pay the City for any direct costs. (B) Group II (Everyone Plays Youth Sports Non-Profit Organizations). Coronabased non‐profit youth sports organizations must have at least 65% resident participation,

REDLINE

Page 1259 of 2528 ends

15 DEAND\14000.15002\10322752.5
operate with an ‘everyone plays, no child is turned away’ philosophy, and require that each participant plays a significant portion of every game. Organization board members, league officials, coaches, and trainers may not receive any form of compensation. The Organization must have been established for at least one year and have a Board of Directors that maintains meeting minutes. All organizations must provide proof of 501(c)(3) status from the IRS and a current non-profit determination from the California Franchise Tax Board, confirming good standing with both agencies. The organization must also provide written proof of residency for participants to verify the 65% residency requirements.
(C) Group III (Resident Non-Profit Groups). Corona-based non-profit groups must have their official home or business address within the Corona city limits. Non-profit applicants must provide proof of 501(c)(3) status from the IRS and a current non-profit determination from the California Franchise Tax Board, confirming good standing with both agencies. The nonprofit organization must have been established for at least one year, with the date of establishment listed in its official by-laws.
(D) Group IV (Resident For-Profit Groups / Non-Resident Non-Profit Groups).

Resident for-profit groups must have their official home or business address located within the Corona city limits. Non-resident non-profit groups may have an address outside the Corona city limits, either in another city or in an unincorporated area. Non-profit applicants must provide proof of 501(c)(3) status from the IRS and a current non-profit determination from the California Franchise Tax Board, confirming good standing with both agencies. (E) Group V (Non-Resident Individuals and For-Profit Groups). Non-residents are individuals or for-profit groups who do not meet the Corona residency requirement outlined in this policy. They reside or are located outside the Corona city limits, with an address in another city or in an unincorporated area.

12.24.020 Definitions.

For the purpose of carrying out the intent of this chapter, words, phrases and terms used herein shall have their ordinary meaning unless otherwise as follows. (A) "Amenities" shall be defined asmeans any enclosed or partially enclosed public spaces designated for specific purposes and the areas directly adjacent to those spaces. This includes, but is not limited to, picnic shelters, ball fieldsathletic facilities, playgrounds, skate parks, parking lots and tennis, volleyball and basketball courts. Such areas may be used informally and without the presence or approval of Department staff. (B) "Camp" shall be as defined in §Chapter 9.26.010 of this code. (C) "Camp facility" shall be as defined in §Chapter 9.26.010 of this code. (D) "Camp paraphernalia" shall be as defined in §Chapter 9.26.010 of this code.

REDLINE

Page 1260 of 2528 ends
← All documents from this meeting