CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
standard professional practice to allow the writing of a report of professional quality;
b. A curation agreement with an appropriate qualified repository within San Bernardino County that meets federal standards per 36 CFR Part 79 and therefore would be professionally curated and made available to other archaeologists/researchers for further study. The collections and associated records shall be transferred, including title, to an appropriate curation facility within San Bernardino County, to be accompanied by payment of the fees necessary for permanent curation;
c. For purposes of conflict resolution, if more than one Native American tribe or band is involved with the project and cannot come to an agreement as to the disposition of cultural materials, they shall be curated at the San Bernardino County Museum by default;
d. At the completion of grading, excavation and ground disturbing activities on the site, a Phase IV Monitoring Report shall be submitted to the City documenting monitoring activities conducted by the project archaeologist and Native Tribal Monitors within 60 days of completion of grading. This report shall document the impacts to the known resources on the property; describe how each mitigation measure was fulfilled; document the type of cultural resources recovered and the disposition of such resources; provide evidence of the required cultural sensitivity training for the construction staff held during the required pregrade meeting; and, in a confidential appendix, include the daily/weekly monitoring notes from the archaeologist. All reports produced will be submitted to the City, County Museum, and consulting tribes.
TCR-3 During construction activities, the project applicant shall allow additional archaeological monitors of Native American tribes to access the project site on a volunteer basis to monitor grading and excavation activities.
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 157
5.19 UTILITIES AND SYSTEM SERVICES
5.19.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to utilities and service systems.
Sewer System
Buildout of the Approved Project would involve the installation of new or expanded sewer laterals and mains in the City and SOI. Full buildout under the proposed General Plan is estimated to generate an increase of total sewer flows in the City and SOI by 4,058,546 gallons per day (GPD) or 12 percent. Existing sewer flows in the City and SOI are 15.2 million gallons per day (MGD), and proposed conditions would be 17.1 MGD.
The 1.8 million gallons per day (MGD) (1,830,240 GPD) change in sewer flows between existing conditions and proposed conditions would not exceed the projected future capacity of the City’s Water Reclamation Facilities (WRFs) which have a total future treatment capacity of 18 MGD. Additionally, developer fees and individual required permits and applications would vary be required and reduce impacts. No impact is anticipated.
Water Supply Systems
Buildout of the Approved Project would increase the population in the City and SOI by approximately 11,511 residents. Major deficiencies are not anticipated as the City has confirmed that it would have adequate capacity to accommodate the proposed increases in water demands under the buildout of the Approved Project.
Additionally, individual projects would be subject to City permits, fees, and applications in order to ensure that these projects would not pose burdens on the existing infrastructure. No significant impacts from the construction or expansion of water facilities or water supplies are anticipated.
Storm Drainage Systems
Portions of the City and SOI are vulnerable to flooding. To prevent and control flooding, the City prepared a Strom Drain Master Plan which provided three deficiency remedies – installing new systems, replacing systems, and installing parallel systems – to prevent and control flooding. The City DWP provides references on the NPDES residential, industrial/commercial, and construction/ Water Quality Management Plan (WQMP) guidelines in order to regulate the types of discharge that enter the storm drain system. Future individual developments built according to the proposed General Plan would also require an assessment of how the project would affect the existing and proposed storm drain system. Funding for drainage facilities would come from development impact fees collected under Chapter 16.23, Development Impact Fees, of the City’s Municipal Code. Therefore, the State and local policies, including the General Plan, as well as the improvements recommended in the Storm Drain Master Plan Update, would reduce the potential impacts of development on the drainage system within the City of Corona.
Solid Waste
Buildout of the General Plan would result in an increase of 63,900 tons per year (approximately 175 tons per day). The two landfills accepting the majority of landfilled solid waste from Corona have a total remaining
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
capacity of 178,177,170 cubic yards and a combined residual daily disposal capacity of 14,817 tons per day.
Additionally, the County of Riverside is required to maintain 15 years’ identified disposal capacity, or have a plan to transform or divert its waste, pursuant to AB 939. There is adequate landfill capacity in the region for solid waste that would be generated by the buildout of the General Plan, and impacts were less than significant.
5.19.2 Impacts Associated with the Proposed Project
Would the project:
Environmental Issues
Condition 1:
Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:
Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:
New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Require or result in the relocation or
construction of new or expanded water,
wastewater treatment or storm water
drainage, electric power, natural gas, or
telecommunications facilities, the
construction or relocation of which could
cause significant environmental effects?
X
b) Have sufficient water supplies available to
serve the project and reasonably
foreseeable future development during
normal, dry and multiple dry years?
X
c) Result in a determination by the wastewater
treatment provider which serves or may
serve the project that it has adequate
capacity to serve the project’s projected
demand in addition to the provider’s existing
commitments?
X
d) Generate solid waste in excess of state or
local standards, or in excess of the capacity
of local infrastructure, or otherwise impair
the attainment of solid waste reduction
goals?
X
e) Comply with federal, state, and local
management and reduction statutes and
regulations related to solid waste?
X
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 159
a) Require or result in the relocation or construction of new or expanded water, wastewater treatment or storm water drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND.
Water
The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. Water is currently provided to the project site via the City of Corona Department of Water and Power’s water mains, which includes a 48-inch water line along Quarry Street and East Grant Boulevard and a 12-inch water line along Rimpau Avenue, with 8-inch water lines on-site (Corona 2022, 2019b).
Water supply to the City of Corona Department of Water and Power (CDWP) is provided via imported water from the Western Municipal Water District (WMWD), groundwater from two local basins the Temescal Basin and Bedford-Coldwater Basin, and reclaimed water from landscape irrigation and other nonpotable uses (Corona 2021). Potable water would be provided to the new building through connections to the existing water mains. The proposed water system improvements would be designed and constructed in accordance with the California Building Code and CALGreen requirements, such as CALGreen Division 5.3, Water Efficiency and Conservation. Additionally, as discussed in Section 5.19.2(b), the City contains sufficient supplies to provide water services to the City and the proposed project during normal years, single dry years, and five consecutive dry years projected through 2045. Therefore, the proposed project would not require the construction of new or expanded water facilities that could cause significant effects. Impacts would be less than significant.
Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
Wastewater
The proposed project includes the construction of an aquatics center, pool, and splash pad. Wastewater services are provided by the water reclamation providers. CDWP provides wastewater services to the project site. The CDWP wastewater system includes 368 miles of gravity sewer pipes, 14 lift stations and force mains, and 3 wastewater treatment plants (Corona 2021). The three water reclaimant facilities treat up to 15.5 million gallons per day (MGD), and the Western Riverside County Wastewater Authority contains 2.37 MGD of capacity for the City (Corona 2019b).
The proposed project would utilize the existing 8- to 12-inch pipes surrounding the project site (Corona 2022).
As further discussed in Section 5.19.2(c), the proposed project would not substantially increase wastewater.
Wastewater generated at the proposed project would be conveyed to the existing sewer lines within the project site. Therefore, the proposed project would not require the construction of new or expanded wastewater facilities that could cause significant environmental effects. Impacts would be less than significant. Accordingly,
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
Stormwater Drainage
As discussed in Section 5.10, the proposed project would result in a slight increase in impervious surfaces compared to existing conditions with the construction of the proposed project. The stormwater from the proposed project would be conveyed to existing stormwater drains or to the neighboring storm drain system along roadways, to the storm drain channel/Temescal Wash approximately 0.10 miles northeast. The proposed project would not significantly increase or change the stormwater volume, rate, or pattern. Beyond connecting to the existing stormwater system. Impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
Electric Power
Electricity is provided by Southern California Edison. The proposed project would connect to existing electric power infrastructure for operation. Although the proposed project would result in a higher electricity demand than existing conditions, the increase would be negligible in Southern California Edison’s capacity. Furthermore, the development of the new concessions buildings and other structures would be required to comply with energy efficiency standards set forth by the California Building Energy Efficiency Standards for Residential Buildings (Title 24, Part 6). Implementation of the proposed project would not result in major construction related to electrical power facilities that could cause significant environmental impacts. Impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
Natural Gas
Natural gas service is provided by the Southern California Gas Company to the City of Corona. As discussed in Section 5.6, Energy, the natural gas demand by the proposed new facilities would total 2,508,299 kilo-British thermal units per year following buildout of the proposed project. While the proposed project would result in an increase in natural gas demand, the new park facility buildings would be consistent with the requirements of the Building Energy Efficiency Standards and would generally result in a decrease in per capita natural gas consumption. Compliance with these codes would decrease overall reliance on fossil fuels and increase reliance on renewable energy sources for electricity generation. Therefore, operation of the proposed project would be similar to development contemplated in the 2020 Certified EIR. The proposed project would not result in any impacts with respect to natural gas usage and the project would not require the construction of new or expanded natural gas facilities. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
Telecommunications
The proposed project would not require additional telecommunications facilities as the project site would continue to be served by existing providers in the region. The proposed project would not require off-site
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 161
construction or relocation of utilities, and therefore no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. b) Have sufficient water supplies available to serve the project and reasonably foreseeable future development during normal, dry and multiple dry years?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. CDWP provides potable water and non-potable water to the project site. Sources of potable water for CDWP includes imported water from the Western Municipal Water District (WMWD), treated groundwater from two local basins the Temescal Basin and Bedford-Coldwater Bason, reclaimed water from landscape irrigation, and other non-portable uses (Corona 2021). According to the City of Corona’s 2020 Urban Water Management Plan, the City has reliable and adequate supplies to meet water demands during normal years, single dry years, and five consecutive dry years projected through 2045. The UWMP discussed having a surplus of water supply in 2045 during a normal year of 7,871 acre-foot per year (AFY) and an excess of 6,643 AFY after five consecutive dry years, thus would have sufficient supplies to prove water for the projected growth of the City and projects.
The proposed community center and aquatics center would increase the demand for water services. The average pool water evaporation rate is about a quarter of an inch of water per day (American Leak Detection 2022).
Assuming two pools, the outdoor water use needed to account for pool water evaporation is approximately 3,111 gpd. Additionally, as seen in Table 15, Proposed Increase in Portable Water Demand, the community center would increase daily water demand by 32,433gpd, for a total increase of approximately 35,544 gpd. The proposed project is expected to increase water daily water demand by 0.10 AFY,6 which would be considered a negligible increase compared to projected excess supplies in water supply.
The proposed project’s water demand would be captured by the projected demand of the UWMP. Furthermore, development of the proposed project would be required to comply with the provisions of CALGreen 6 1 AFY = 325,851 gallons
32,433 ÷ 325,851 = 0.10 AFY
Table 15 Proposed Increase in Potable Water Demand
Category
Demolished
(SF)
New Facility
(SF)
Net Increase
(SF)
Water Demand Rate
gpd/SF1
Daily Water
Demand (gpd)
Community Center 3,100 60,000 56,090 0.572 32,433
Aquatics Center and
Swimming Pool 19,840 — — 3,1113
Total 3,100 79,840 56,090 — 35,544
Source: CAPCOA 2022
Notes: gpd = gallons per day; SF = square feet
1 350 days per year is used to convert gallons per year to gallons per day. 2 The rate for “Government (Civic Center)” is used. 3 Evaporation off the surface of the pool is calculated by multiplying 0.021 ft/day (half an inch a day) by the surface area of the pool (19,840 square feet) for a total of 416 cubic feet per day of water lost to evaporation. 416 cubic feet per day is 3,111 gpd.
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
Division 5.3, Water Efficiency and Conservation, including those of Sections 5.303, Indoor Water Use, and
5.304, Outdoor Water Use. Additionally, the proposed aquatics center and fountain would be consistent with the 2020 UWMP policies, which prohibit the overfilling of pools and require the installation of recirculating pumps to limit the waste of water. Based on the City of Coronas UWMP, the City contains adequate water supplies to meet the water demands of the proposed project and the City during normal, dry, and multiple dry years. Impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR. c) Result in a determination by the waste water treatment provider, which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. Wastewater services are provided by CDWP to the project site. The CDWP wastewater system includes 368 miles of gravity sewer pipes, 14 lift stations and force mains, and three wastewater treatment plants (Corona 2021). The three water reclaimant facilities treat up to 15.5 million gallons per day (MGD), and the Western Riverside County Wastewater Authority provides 2.37 MGD of capacity for the City (Corona 2019b). The proposed project would utilize the existing 8- to 12-inch pipes surrounding the project site (Corona 2022). The stormwater and wastewater flows from the project site are expected to marginally increase but would not be enough to require the construction of new or expanded wastewater treatment facilities. Though the proposed project will increase employee capacity at the project site, which would increase wastewater generation, the increase would not overburden the wastewater treatment provider that serves the site. Therefore, impacts would be less than significant.
Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
d) Generate solid waste in excess of state or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. During construction, the proposed project would generate some demolition debris from clearance and waste debris. Construction solid waste generation would be minimal due to the demolition of small structures and, CALGreen Section 5.408, Construction Waste Reduction, Disposal, and Recycling, requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse.
The City of Corna contrasts with Waste Management Inc. (WMI) for trash and recycling services. The proposed project site would continue to operate as a park facility. However, the proposed project would construct a larger community center with an anticipated increase in events and an aquatics center, which would increase the amount of solid waste generated by Corona City Park. Solid waste generated in the City of Corona is
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 163
transported to two landfills, the El Sobrante and Olinda Alpha Landfill (Cal Recycle 2024). The El Sobrante Landfill in the City of Corona will receive the solid waste from the project site. The Sobrante Landfill contains a remaining capacity of 143,977,170 cubic years as of April 2018.
Table 16 Landfill Capacity
Landfill Name
Current Remaining
Capacity
(tons) 1
Maximum Daily
Disposal Capacity
(tons)
Average Daily
Disposal
(tons)2
Residual Daily
Disposal Capacity
(tons)
Annual
Disposal
Capacity
(tons)
Estimated
Close Date
El Sobrante
Landfill 143,977,170 16,054 5,599 10,455 3,136,500 2051 Sources: CalRecycle 2019b, 2019c.
1 A Volume-to-Weight conversion rate of 2,000 lbs/cubic yard (1 tons/cubic yard) for “Compacted - MSW Large Landfill with Best Management Practices” is used as per CalRecyle’s 2016 Volume-to-Weight Conversion Factors, https://www.epa.gov/sites/production/files/201604/documents/volume_to_weight_conversion_factors_memorandum_04192016_508fnl.pdf. 2 Average daily disposal is calculated based on 300 operating days per year. The facility is open six days per week, Monday through Saturday, except certain holidays.
Table 17 Proposed Increase in Solid Waste Generation
Category
Demolished
(SF)
Expanded
(SF)
New Facility
(SF)
Generation Rate
(tons/1,000 SF/year)
Total
(tons/year)
Community Center 3,100 60,000 56,090 5.71 320
Aquatics Center
and
Swimming
Pool
19,840 5.72 113
Total 3,100 79,840 56,090 — 433
Source: CAPCOA 2022q and 2022b.
Notes: SF = square feet
1 The rate for “Government (Civic Center)” is used. 2 The rate for “Recreational Swimming Pool” is used.
As demonstrated in Table 16 and Table 17, there is adequate landfill capacity for the proposed project’s forecast solid waste, and project development would not require additional landfill capacity at the landfill serving the City. The total amount of solid waste expected to be generated under the proposed project would be minimal compared to the annual disposal capacity of the landfill serving the City. Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
e) Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?
Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. Solid waste would be generated during the construction and operation of the proposed project.
The proposed project would comply with all regulations pertaining to solid waste, such as the California Integrated Waste Management Act and local recycling and waste programs. The proposed project would comply
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
with all applicable laws and regulations and make every effort to reuse and/or recycle the construction debris that would otherwise be taken to a landfill. Section 5.408 of CALGreen requires that at least 65 percent of the nonhazardous construction and demolition waste from nonresidential construction operations be recycled and/or salvaged for reuse. Hazardous waste, such as paint used during construction, would be disposed of only at facilities permitted to receive them in accordance with local, state, and federal regulations. The proposed project would comply with all applicable federal, state, and local statutes and regulations related to solid waste disposal. Therefore, impacts would be less than significant. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
5.19.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to utilities and service systems were outlined in the 2020 Certified EIR.
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 165
5.20 WILDFIRE
5.20.1 Summary of Impacts Identified in the Program EIR The 2020 Certified EIR concluded that the Approved Project resulted in less than significant impacts to wildfire.
Emergency Evacuation Plan
The City of Corona has prepared an Emergency Operations Plan (EOP) and Local Hazard Mitigation Plan (LHMP) to ensure the effective allocation of resources for the maximum benefit during a time of emergency, and to identify local hazards and provide mitigation measures to address these hazards, respectively. Buildout of the Approved Project would not result in substantial changes to the circulation patterns or emergency access routes in the City or SOI identified in the City’s LHMP and EOP. The City also has established evacuation plans and protocols to ensure the safe and orderly notification and evacuation of people in Corona should the need arise. Future development would be required to comply with applicable local and State standards, fire and building codes, and to ensure adequate access project would be reviewed by the CFD prior to approval.
Adherence to local and State policies would reduce impacts to less than significant.
Exacerbate Wildfire Risk
The City of Corona and its SOI are vulnerable to and at significant risk of wildfires. The City has approximately 9,300 housing units and 3 million square feet of office, commercial, and industrial buildings in the very high FHSZ. Development associated with the buildout of the General Plan would result in new development within the wildland-urban interface (WUI) and would place more assets in the very high FHSZ. Future development would be required to adhere to state and local codes (California Fire Code, CAL FIRE fire safe design requirements, City Fire and Public Works Standards, and other standards). Because development in the WUI presents challenges for fire protection and suppression, development in these areas are required to abide by the CFD’s Structure Protection Plan (SPP), which addresses fuel modification requirements. With adherence to these building practices and fuel modification requirements in the SPP, development associated with the General Plan would not exacerbate risk.
Associated Infrastructure
Buildout of the General Plan would result in additional infrastructure, including roadways and transmission lines, in undeveloped areas of the City and SOI in order to serve new development. Some of this infrastructure would be placed with the very high FHSZ. To protect development in the very high FHSZ, the City requires adherence to a wide range of state and local codes (California Fire Code, CAL FIRE fire safe design requirements, City Fire and Public Works Standards, and other standards), including SPP requirements for new infrastructure. With adherence to these building practices and fuel modification requirements in the SPP, infrastructure associated with the General Plan buildout would not exacerbate risk.
Expose People or Structures to Significant Risk
Wildfires on hillsides can create hazards in the form of debris or mudflows, which occurs most frequently on hillsides that have little to no vegetation and are most common following wildfires. As identified above, to
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
protect development in the very high FHSZ, with adherence to these building practices and fuel modification requirements in the SPP, impacts associated with the General Plan buildout would not exacerbate risk.
Areas of the city adjacent to the Santa Ana River, Temescal Creek, and Mabey Canyon Wash are designated as Flood Zone A, a 100-year flood zone, and other areas of the city are within a 500-year flood zone. Future development would be required to meet federal floodplain regulations, including that the lowest floor of the structure is raised above a 100-year based flood elevation. Therefore, impacts to the exposure of structures or people to flooding as a result of post-fire slope instability would be less than significant.
Marginally stable slopes may be subject to landslides caused by earthquakes. The terrain of the City is varied, ranging from relatively flat to hilly. Grading permits for hillside developments must have an engineering geology report prepared and submitted to the City. Therefore, impacts as a result of post-fire slope instability would be less than significant.
5.20.2 Impacts Associated with the Proposed Project
If located in or near state responsibility areas or lands classified as very high fire hazard severity zones, would the project:
Environmental Issues
Condition 1:
Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:
Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:
New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Substantially impair an adopted emergency
response plan or emergency evacuation
plan?
X
b) Due to slope, prevailing winds, and other
factors, exacerbate wildfire risks, and
thereby expose project occupants to
pollutant concentrations from a wildfire or
the uncontrolled spread of a wildfire?
X
c) Require the installation or maintenance of
associated infrastructure (such as roads,
fuel breaks, emergency water sources,
power lines or other utilities) that may
exacerbate fire risk or that may result in
temporary or ongoing impacts to the
environment?
X
d) Expose people or structures to significant
risks, including downslope or downstream
flooding or landslides, as a result of runoff,
post-fire slope instability, or drainage
changes?
X
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 167
a) Substantially impair an adopted emergency response plan or emergency evacuation plan? Less Than Significant Impact/No Changes or New Information Requiring Preparation of an EIR/MND. The project site is located within a LRA as a non-Very High Fire Hazard Severity Zone (VHFHSZ) (Cal Fire 2024). The project site is not located in a SRA or lands classified as VHFHSZ. The nearest FHSZ is approximately 2.2 miles southeast of the project site and designated as a VHFHSZ in a SRA. The project site does not abut a VHFHSZ and is not located within the Wildlife Urban Interface (SILVIS 2019).
Additionally, the project site is located within an urbanized, built-out area of the City. Operation of the proposed project would continue to operate as a park and serve nearby residents. The proposed project would follow the appropriate local and regional procedures and policies regarding emergency response and would not interfere with any adopted emergency response or evacuation plan. The project site would accommodate emergency and ingress and egress by emergency vehicles as required by the CFD. All access features are to and must satisfy the City of Corona’s fire code. Compliance with the required fire code would ensure that adequate emergency access is provided. Additionally, as discussed in Section 5.17, Transportation, the proposed project would not physically impede the circulation network and roadways surrounding the park. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentrations from a wildfire or the uncontrolled spread of a wildfire?
No Impact. As previously discussed, the project site and surrounding area are flat and in an urbanized area, and there is no wildland susceptible to wildfire on or near the site. The project site is not located within a VHFHSZ. The surrounding area is currently developed, and therefore lacks the vegetation necessary for the uncontrolled spread of a wildfire. Construction activities would be subject to review by CFD to ensure adequate fire protection according to the standards of the Uniform Fire Code and the California Code. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment? No Impact. The project site is in an urbanized area and is served by existing utility infrastructure, including water, wastewater, and power. The proposed project is located within an urbanized area and would not require the installation or maintenance of associated infrastructure that may exacerbate fire risk. Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
d) Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire slope instability, or drainage changes? No Impact. The project site is in an urbanized area and there is no wildland susceptible to wildfire on or near the site. CAL FIRE does not classify any adjacent areas as a VHFHSZ. Additionally, according to the FEMA flood zone map, the project site is located within Zone X, an area of minimal flood hazard (FEMA 2009). The project site and surrounding area are generally flat and would have low potential of post-fire slope instability.
Therefore, no impact would occur. Accordingly, no new significant impacts or impacts of greater severity than those identified in the 2020 Certified EIR would occur. No changes or new information would require preparation of a supplemental or subsequent EIR.
5.20.3 Adopted Mitigation Measures Applicable to the Proposed Project No mitigation measures related to wildfire were outlined in the 2020 Certified EIR.
CITY PARK REVIT A LIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
June 2026 Page 169
5.21 MANDATORY FINDINGS OF SIGNIFICANCE
Environmental Issues
Condition 1:
Substantial
Change in
Project
Requiring
Major
Revisions
Condition 2:
Substantial
Change in
Circumstances
Requiring
Major
Revisions
Condition 3:
New
Information
Showing New
or Increased
Significant
Effects
Less Than
Significant
Impact/No
Changes or
New
Information
Requiring
Preparation of
an EIR/MND No Impact
a) Does the project have the potential to
substantially degrade the quality of the
environment, substantially reduce the
habitat of a fish or wildlife species, cause a
fish or wildlife population to drop below selfsustaining levels, threaten to eliminate a plant or animal community, substantially
reduce the number or restrict the range of a
rare or endangered plant or animal or
eliminate important examples of the major
periods of California history or prehistory?
X
b) Does the project have impacts that are
individually limited, but cumulatively
considerable? (“Cumulatively considerable”
means that the incremental effects of a
project are considerable when viewed in
connection with the effects of past projects,
the effects of other current projects, and the
effects of probable future projects.)
X
c) Does the project have environmental effects
which will cause substantial adverse effects
on human beings, either directly or
indirectly?
X
a) Does the project have the potential to substantially degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, substantially reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? Less Than Significant Impact/ No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would not result in impacts beyond what was previously analyzed in the 2020 Certified EIR. The geographic range and severity of impacts to biological resources resulting from the proposed project would be similar to those that would result from implementation of the Approved Project.
The proposed project would not result in a significant impact to biological resources, consistent with the Approved Project, and mitigation measures BIO-1, BIO-2, BIO-3, and BIO-4 would ensure impacts to biological resources are reduced. The proposed project would incorporate all applicable mitigation measures identified in 2020 Certified EIR as discussed in Sections 5.3, Air Quality, 5.4, Biological Resources, 5.5, Cultural Resources, 5.7, Geology and Soils, , and 5.18, Tribal Cultural Resources, above. The proposed project would not result
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
5. Environmental Analysis
in any new impacts or substantially increase the severity of previously disclosed impacts related to biological, cultural, paleontological, or tribal cultural resources. Therefore, preparation of supplemental or subsequent EIR is not required by CEQA.
b) Does the project have impacts that are individually limited, but cumulatively considerable? (“Cumulatively considerable” means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects.)?
Less Than Significant Impact/ No Changes or New Information Requiring Preparation of an EIR/MND. Changes proposed by the proposed project compared to the Approved Project would not result in any new cumulatively considerable impacts or substantially increase the severity of previously disclosed cumulatively considerable impacts. The 2020 Certified EIR addresses cumulative impacts in accordance with CEQA Guidelines Section 15130. Pursuant to CEQA Guidelines Section 15130 (b)(1), the information used in an analysis of cumulative impacts should come from one of two sources:
1) A list of past, present, and probable future projects producing related cumulative impacts, including, if necessary, those projects outside the control of the agency; or 2) A summary of projections contained in an adopted general plan or related planning document designed to evaluate regional or area-wide conditions.
The cumulative impacts identified in the 2020 Certified EIR used method No. 2. As discussed previously in this addendum, the proposed project would have no impact, or a less than significant impact/no changes as compared to the Approved Project. Therefore, all impacts are individually limited and would not result in any new cumulatively significant impacts compared to the Approved Project. Impacts would be less than significant, and the proposed project would not generate a new cumulatively considerable impact. The preparation of supplemental or subsequent EIR is not required by CEQA. c) Does the project have environmental effects which will cause substantial adverse effects on human beings, either directly or indirectly?
Less Than Significant Impact/ No Changes or New Information Requiring Preparation of an EIR/MND. The proposed project would not result in an increase of residents compared to the Approved Project. The proposed project would remain a locally serving park for the residents of the City of Corona.
The proposed project would comply with applicable local, state, and federal laws governing general welfare and environmental protection. The implementation of the required mitigation measures specified in the Approved Project, and incorporated into this addendum would reduce impacts to less than significant.
Changes proposed by the proposed project to the Approved Project would not result in any new substantial adverse impacts or substantially increase the severity of previously disclosed adverse impacts on human beings, either directly or indirectly. Therefore, a less than significant impact would occur and preparation of supplemental or subsequent EIR is not required by CEQA.
June 2026 Page 171
6. Findings
As summarized below, and for the reasons described in Chapter 4, Environmental Analysis, of this Addendum, the City has concluded that the proposed project meets the conditions of CEQA Guidelines Section 15164 and that therefore an Addendum to the 2020 Certified EIR is the appropriate CEQA document to address the proposed project.
As previously discussed, under CEQA Guidelines Section 15164, an addendum to an EIR may be prepared if only minor technical changes or additions are necessary or none of the conditions described in CEQA Guidelines Section 15162 calling for the preparation of a subsequent EIR have occurred. The following restates the standards set forth in CEQA Guidelines Section 15162 as they relate to the proposed project.
1. No substantial changes are proposed in the project which would require major revisions of the Certified EIR to the involvement of new significant environmental effect or a substantial increase in the severity of previously identified significant effect.
The proposed project would occur within the same boundaries of the project site. The proposed project would redevelop the existing park with a new community center, sports facilities, aquatics center and pool, play fields, a skate area, a splash pad, a stage and screen area for community events including market/vender spaces, and ornamental landscaping. The proposed project does not include a change in land use or additional development that was not previously analyzed in the 2020 Certified EIR. The proposed project includes construction-type activities previously analyzed in the 2020 Certified EIR. The proposed project does not include substantial changes compared to the Approved Project; implementation of the proposed project would not require revisions to the 2020 Certified EIR. The analysis provided in Chapter 4, Environmental Analysis, illustrates that the proposed project would not result in any new or more severe significant impacts than those identified in the 2020 Certified EIR.
2. No substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the Certified EIR due to the involvement of new significant environmental effects or a substantial increase in the severity of previously identified significant effects.
Substantial changes have not occurred with respect to the circumstances under which the approved project was undertaken that would require major revisions to the 2020 Certified EIR. Under the Approved Project, the project site is zoned Parks with a land use designation as Open Space Recreational, which allows up park and recreational uses, and therefore, the Approved Project assumed that the project site would serve as a park and recreational use. Implementation of the proposed project would occur within the impact boundaries identified in the 2020 Certified EIR. The proposed project does not include a change in land use or propose
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
6. Findings
any off-site improvements. Therefore, no proposed changes or revisions to the 2020 Certified EIR are required.
3. No new information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous EIR was certified as complete or the negative declaration was adopted, shows any of the following:
A. The project will have one or more significant effects not discussed in the previous EIR or negative declaration
The proposed project would be implemented within the impact boundary identified for the Approved Project analyzed in the 2020 Certified EIR. Additionally, the proposed project does not include any land use changes; therefore, the proposed project would not affect the operational conditions analyzed in the 2020 Certified EIR. The construction activities associated with the proposed project would not include new construction equipment, intensity or methods that would substantially increase significant impacts identified in the 2020 Certified EIR.
B. Significant effects previously examined will be substantially more severe than shown in the previous EIR;
Based on the analysis above, the new components in the proposed project would not result in more severe impacts than those identified in the 2020 Certified EIR. All other operational characteristics of the approved project would remain unchanged from those evaluated in the 2020 Certified EIR and subsequent addenda.
C. Mitigation measures or alternatives previously found not to be feasible would in fact be feasible and would substantially reduce one or more significant effects of the project, but the project proponents decline to adopt the mitigation measure or alternative; or Mitigation measures or alternatives previously found not to be feasible at the time the 2020 Certified EIR was prepared have not been identified as feasible. The proposed project would incorporate all applicable mitigation measures from the 2020 Certified EIR. The mitigation measures not applicable to the proposed project would continue to be valid, feasible, and applicable to the Approved Project as refined by in the subsequent addendum.
D. Mitigation measures or alternatives which are considerably different from those analyzed in the previous EIR would substantially reduce one or more significant effects on the environment, but the project proponents decline to adopt the mitigation measure or alternative.
No new mitigation measures or alternatives were identified. The existing applicable mitigation measures from the 2020 Certified EIR would reduce impacts to the feasible extent possible.
June 2026 Page 173
7. List of Preparers
CITY OF CORONA (LEAD AGENCY)
Rachel McLure, CIP Supervisor
PLACEWORKS (CEQA CONSULTANT)
Malia Durand, Principal
Emma Haines, Associate I
Natalie Phan, Planner
Angel Castro, Planner
Nicole Vermilion, Principal – Air Quality and Greenhouse Gas Emissions Emily Parks, Associate I – Air Quality and Greenhouse Gas Emissions Chris Shields, Senior Associate II, Noise & Vibration
Cary Nakama, Graphics Specialist
CITY PARK REVITLIZATION PROJECT ADDENDUM
CITY OF CORONA
7. List of Preparers
This page intentionally left blank.
June 2026 Page 175
8. References
Bay Area Air Quality Management District (BAAQMD). 2023, May. California Environmental Quality Act Air Quality Guidelines. https://www.baaqmd.gov/plans-and-climate/california-environmentalquality-act-ceqa/updated-ceqa-guidelines.
CalEPA. 2025a, November 10 (accessed). Solid Waste Disposal Sites Identified by the Water Board with Waste Constituents above Hazardous Waste Levels Outside the Waste Management Unit. ———. 2025b, November 10 (accessed). List of Active Cease and Desist Orders and Cleanup and Abatement Orders from the Water Board.
California Air Pollution Control Officers Association (CAPCOA). 2022. Generation Rates. https://view.officeapps.live.com/op/view.aspx?src=https%3A%2F%2Fwww.caleemod.com%2Fdoc uments%2Fuser-guide%2F08_Appendix%2520G_v2022.1.1.3.xlsx&wdOrigin=BROWSELINK California Air Resources Board (CARB). 2005, April. Air Quality and Land Use Handbook: A Community Health Perspective. https://www.aqmd.gov/docs/default-source/ceqa/handbook/california-airresources-board-air-quality-and-land-use-handbook-a-community-health-perspective.pdf. ———. 2022, December. 2022 Scoping Plan for Achieving Carbon Neutrality. https://ww2.arb.ca.gov/sites/default/files/2023-04/2022-sp.pdf. ———. 2024, June 19 (accessed). Area Designations Maps/State and National. https://ww2.arb.ca.gov/resources/documents/maps-state-and-federal-area-designations.
California Department of Forestry and Fire Protection (CalFire). 2024, April 1. https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/ California Department of Conservation (DOC). 2024a, March 22 (accessed). The Farmland Mapping and Monitoring Program. https://maps.conservation.ca.gov/agriculture/#webmaps ———. 2024b, April 21 (accessed). Alquist-Priolo Earthquake Fault Zones. https://www.conservation.ca.gov/cgs/alquist-priolo.
———. 2024c, April 15 (accessed). Fault Activity Map. https://maps.conservation.ca.gov/cgs/fam/ ———. 2024d, April 27 (accessed). Mineral Lands Classification. https://maps.conservation.ca.gov/cgs/informationwarehouse/index.html?map=mlc.
California Department of Forestry and Fire Protection (CAL FIRE). 2024, April 1 . Fire Hazard Severity Zones Maps. https://experience.arcgis.com/experience/03beab8511814e79a0e4eabf0d3e7247/
CITY PARK REVITLIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
8. References
California Department of Transportation (Caltrans). 2024, April 8 (accessed). California State Scenic Highway System Map. https://caltrans.maps.arcgis.com/apps/ webappviewer/index.html?id=465dfd3d807c46cc8e8057116f1aacaa.
California Department of Water Resources (CDWR). 2024a, May 3. SGMA Data Viewer. https://sgma.water.ca.gov/webgis/?appid=SGMADataViewer#boundaries. ———. 2024b, May 13 (accessed). Dam Breach Inundation Map. https://fmds.water.ca.gov/webgis/?appid=dam_prototype_v2 Corona, City of. 2024a, March 22 (accessed). Property Information – Geography Information Services. https://corgis.coronaca.gov/apps/propertyinformation/.
———. 2024b. May 3. City Park Master Plan. https://www.citypark.coronaca.gov/. ———. 2024c. April 15 (accessed). Chapter 15.36 – Grading Regulations. https://ca.water.usgs.gov/land_subsidence/california-subsidence-areas.html ———. 2024d. August 6 (accessed). Chapter 12.22 – Community Urban Forest and Landscape Guidelines. https://codelibrary.amlegal.com/codes/corona/latest/corona_ca/0-0-0-42777 ———. 2024e. August 6 (accessed). Urban Forest Management Plan. chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.coronaca.gov/home/showpublishedd ocument/22458/637890970605900000.
———. 2023. 2020-204- General Plan.
https://www.coronaca.gov/home/showpublisheddocument/25479/638494039032370000 ———. 2022. City of Corona GIS Maps and Data - Sewer Gravity Main. https://giscityofcorona.opendata.arcgis.com/datasets/cityofcorona::sewer2/explore?layer=11&location=33.874801%2C-117.555952%2C16.00. ———. 2021, June 16. 2020 Urban Water Management Plan. chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.coronaca.gov/home/showpublishedd ocument/20292/637612402713400000.
———. 2019a, November 22. Standards of Coverage and Headquarters Services Assessment Volume 1 of 2 – Technical Report.
https://www.coronaca.gov/home/showpublisheddocument/17206/637102948578300000 ———. 2019b, December. Corona General Plan Technical Update. https://www.coronaca.gov/home/showpublisheddocument/17290/637122799157100000 ———. 2015. Historic Markers. https://www.coronaca.gov/government/departments/communitydevelopment/planning-division/historical-markers.
CITY PARK REVITALIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
8. References
June 2026 Page 177
———. 2014, December 15. City of Corona – Maintenance Services Department – Approved Street Tree List. chromeextension://efaidnbmnnnibpcajpcglclefindmkaj/https://www.coronaca.gov/home/showpublishedd ocument/4561/636342430829570000
Department of Toxic Substances Control (DTSC). 2025a. EnviroStor. http://www.envirostor.dtsc.ca.gov/public/.
———. 2025b. Hazardous Waste Facilities Subject to Corrective Action.
Federal Emergency Agency (FEMA). 2008, August 28.
https://msc.fema.gov/portal/search?AddressQuery=930%20E%206th%20St%2C%20Corona%2C %20Ca%2092879%20.
International Dark-Sky Association (IDA). 2020. Outdoor Lighting Basics. https://www.darksky.org/ourwork/lighting/lighting-for-citizens/lighting-basics/.
National Park Service (NPS). 2024, March (accessed). National Register of Historic Places. https://www.nps.gov/maps/full.html?mapId=7ad17cc9-b808-4ff8-a2f9-a99909164466.
Office of Environmental Health Hazard Assessment (OEHHA). 2015, February. Air Toxics Hot Spots Program Risk Assessment Guidelines. Guidance Manual for Preparation of Health Risk Assessments. http://oehha.ca.gov/air/hot_spots/2015/2015GuidanceManual.pdf.
Peirce, R. (2004). Low frequency noise criteria for concerts. 29. 32-34.
RWDI. (2025). Amphitheater Events – Noise Impact Predictions Corona City Park. April 14th.
Southern California Association of Governments (SCAG). 2024, April 14. Connect SoCal Plan: The 2024– 2050 Regional Transportation Plan / Sustainable Communities Strategy of the Southern California Association of Governments. https://www.connectsocal.org/Pages/Connect-SoCal-Final-Plan.aspx.
South Coast Air Quality Management District (South Coast AQMD). 1993. California Environmental Quality Act Air Quality Handbook.
———. 2008, July. Final Localized Significance Threshold Methodology. https://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/final-lst-methodology-document.pdf. ———. 2010, September 28. Minutes for the GHG CEQA Significance Threshold Stakeholder Working Group #15. http://www.aqmd.gov/docs/default-source/ceqa/handbook/greenhouse-gases-(ghg)- ceqa-significance-thresholds/year-2008-2009/ghg-meeting-15/ghg-meeting-15-minutes.pdf. ———. 2011. Fact Sheet for Applying CalEEMod to Localized Significance Thresholds. http://www.aqmd.gov/docs/default-source/ceqa/handbook/localized-significancethresholds/caleemod-guidance.pdf.
CITY PARK REVITLIZATION PROJECT EIR ADDENDUM
CITY OF CORONA
8. References
———. 2022, December. Final 2022 Air Quality Management Plan. https://www.aqmd.gov/docs/default -source/clean-air-plans/air-quality-management-plans/2022-air-quality-management-plan/final -2022-aqmp/final-2022-aqmp.pdf?sfvrsn=16.
———. 2023, March (revised). South Coast AQMD Air Quality Significance Thresholds. https://www.aqmd.gov/docs/default-source/ceqa/handbook/south-coast-aqmd-air-quality -significance-thresholds.pdf?sfvrsn=25.
Spatial Analysis For Conservation and Sustainability (SILVIS) Lab. 2019, May 17. Wildland Urban Interface. https://www.arcgis.com/home/webmap/viewer.html?layers=a4985d64969743db8feddf01c96c9435 State Water Resources Control Board (SWRCB). 2025. GeoTracker. http://geotracker.waterboards.ca.gov/.
United States Geological Survey (USGS). 2024, April 15 (accessed). Areas of Land Subsidence in California. https://ca.water.usgs.gov/land_subsidence/california-subsidence-areas.html.
United States Census. 2023, April 8 (accessed). QuickFacts. https://www.census.gov/quickfacts/fact/table/coronacitycalifornia/PST045222.
World Health Organization (WHO). 2022. WHO Global standard for safe listening venues & events.
DRAFT MINUTES - July 27, 2026
City of Corona - Historic Preservation Board Page 1
City of Corona
Historic Preservation Board Minutes
Monday, July 27, 2026, 5:00 p.m.
Council Chambers
400 S. Vicentia Avenue
Corona, CA 92882
Board Present: Kacie Rubalcava, Julie Bruckner, Amanda Kalkanis, Richard Winn Board Absent: Mallory Gonzalez
_____________________________________________________________________
1. PLEDGE OF ALLEGIANCE
Vice Chair Rubalcava led the Pledge of Allegiance.
2. CALL TO ORDER
Vice Chair Rubalcava called the meeting to order.
3. MEETING MINUTES
3.1 MINUTES - June 29, 2026
These minutes were approved.
Moved by: Amanda Kalkanis
Seconded by: Richard Winn
Aye (4): Kacie Rubalcava, Julie Bruckner, Amanda Kalkanis, and Richard Winn Absent (1): Mallory Gonzalez
Motion APPROVED (4 to 0)
4. COMMUNICATIONS FROM THE PUBLIC
The following residents addressed the Board: Cory Connell, Chris McCoy, Maddy Paxton, and Joe Morgan.
5. CONSENT CALENDAR
None.
6. PUBLIC HEARINGS
Board Member Winn recused himself from discussion of item MARD2026-0002 at the advice of Deputy City Attorney Jamie Raymond. Ms. Raymond stated the reason for Mr.
Winn's recusal.
DRAFT MINUTES - July 27, 2026
City of Corona - Historic Preservation Board Page 2
6.1 MARD2026-0002 (CONTINUED)
Brendan Dalde, Associate Planner, and Donna Finch, Community Services Director, reviewed the staff report and exhibits for MARD2026-0002.
Discussion ensued between the Board and staff regarding various details of this project.
The architect for the project, Danny Travis of Rios Design, answered questions regarding design elements for the project.
Vice Chair Rubalcava opened the public hearing.
The following residents addressed the Board and provided comments in opposition of the proposed project: Richard Winn, Richard Cortez, Joe Morgan, Rory Connell, Chris McCoy, Monica Delgadillo, Don Fuller, Maddy Paxton, Vanessa Villafan, and McAndrew DeCastro.
Vice Chair Rubalcava closed the public hearing.
The Board's discussion continued and they had additional questions and comments for staff regarding the size of the proposed building, amenity details, and the project's tree plan; staff provided answers and clarification.
Moved by: Amanda Kalkanis
Seconded by: Julie Bruckner
That the Historic Preservation Board adopt an Addendum to the certified Environmental Impact Report for the 2020-2040 General Plan and adopt Resolution No. 2689 granting alterations to City Park (MARD2026-0002), based on the findings contained in the staff report and recommended conditions of approval, and additional recommendations as discussed.
Aye (3): Kacie Rubalcava, Julie Bruckner, and Amanda Kalkanis Abstain (1): Richard Winn
Absent (1): Mallory Gonzalez
Motion APPROVED (3 to 0)
7. WRITTEN COMMUNICATIONS
None.
8. ADMINISTRATIVE REPORTS
None.
9. BOARD MEMBERS' REPORTS AND COMMENTS
Board Member Winn provided comments in regards to any future communications between the City staff and the Corona Historic Preservation Society. Vice Chair Rubalcava expressed appreciation for the public's passion for this project.
10. ADJOURNMENT
DRAFT MINUTES - July 27, 2026
City of Corona - Historic Preservation Board Page 3
Vice Chair Rubalcava adjourned the meeting at 6:33 p.m. to the Historic Preservation Board meeting of Monday, August 31, 2026, commencing at 5:00 p.m. in the City Hall Council Chambers.
Western Riverside Council of Governments
Executive Committee Meeting Recap
August 3, 2026
Following is a summary of key items discussed at the last Executive Committee meeting.
Agenda Packet: https://www.wrcog.us/wp-content/uploads/2026/07/EC-0826-AP.pdf PowerPoint Presentation: https://www.wrcog.us/wp-content/uploads/2026/08/EC-PPT-080326.pdf 2026 Agency Accomplishments and Work Plan
• Chris Gray, WRCOG Interim Executive Director, provided an overview of recent WRCOG accomplishments and upcoming efforts.
• Each of these efforts is tied into the 7 Goals of WRCOG’s Strategic Plan. • Key accomplishments included:
o General Assembly revenue was the highest in the history of the event. Net revenue for General Assembly was $70K.
o WRCOG has partially completed a comprehensive update of HR/Personnel Policies. A key milestone was a comprehensive update of all leave policies and a transition to a PTO system. o Staff for the I-REN Program was increased from 2 full-time staff to 8 full-time staff. o WRCOG held 2 major events (Women’s Day Event & Sustainability Summit) with over 500 attendees. Both events were well received.
o Development of AB 230, which requires Caltrans to coordinate with WRCOG cities along the southern I-15 Corridor to address congestion through short-term improvements like traffic signal coordination.
o The Interim Executive Director is actively involved in regional events, speaking at multiple events throughout the larger region.
o WRCOG retained its first full-time lobbyist to assist with lobbying efforts. o Improved overall Agency transparency based on staff feedback. o WRCOG received 6 statewide or regional awards.
• Key initiatives over the forthcoming months include:
o Finalize the personnel policy update.
o Complete a review and update of Fiscal policies.
o Update WRCOG By-Laws.
o Strategic Plan update.
o Planning a WRCOG Sacramento Lobbying Trip.
o Updating the legislative platform.
o Planning the 2028 General Assembly.
o Determining the future direction of C-PACE.
o Class & Comp Study.
Legislative Update: Townsend Public Affairs
• California’s $351.7B State budget maintains key reserves while adding funding for housing and homelessness, public safety, and other priority programs. • WRCOG is actively supporting legislation related to regional traffic signal synchronization, wildfire resilience financing, artificial intelligence governance, and affordable housing funding.
• With the legislative session ending August 31, attention is shifting to the November ballot, which includes measures addressing housing, state reserves, infrastructure, taxes, healthcare, and election requirements.
Fee Comparison Analysis Findings
• WRCOG recently updated its fee comparison analysis to evaluate development impact fees across western Riverside County, including how fees vary by land use, how they have changed since 2022, and how they relate to total development costs.
• WRCOG member agency fees have been adjusted and steadily increased since 2016. Annual rate of growth for majority of agencies is equal to CPI and less than CCI. Member agency reliance on fee adjustments may reflect the lack of State investment in infrastructure. • WRCOG member agency fees are now higher on average than SB County agencies. Comparison is skewed because SB County fees have not increased consistent with either CCI or CPI. • Analysis shows that fees are 10% - 15% of the total project cost for residential units.