Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A-1 Assembly—Fixed Seating 1,000 $6,427 $42.2750 $5,355 $35.2292 $4,284 $28.1833 - Theater, Concert Hall 5,000 $8,118 $47.3500 $6,765 $39.4583 $5,412 $31.5667 - - 10,000 $10,485 $37.2100 $8,738 $31.0083 $6,990 $24.8067 - - 20,000 $14,206 $7.8967 $11,838 $6.5806 $9,471 $5.2644 - - 50,000 $16,575 $8.1100 $13,813 $6.7583 $11,050 $5.4067 - - 100,000 $20,630 $20.6300 $17,192 $17.1917 $13,753 $13.7533 A-2 Assembly—Food & Drink 250 $4,344 $114.3225 $3,620 $95.2688 $2,896 $76.2150 - Restaurant, Night Club, Bar 1,250 $5,487 $128.0250 $4,573 $106.6875 $3,658 $85.3500 - - 2,500 $7,088 $100.5900 $5,906 $83.8250 $4,725 $67.0600 - - 5,000 $9,602 $21.3450 $8,002 $17.7875 $6,402 $14.2300 - - 12,500 $11,203 $21.9450 $9,336 $18.2875 $7,469 $14.6300 - - 25,000 $13,946 $55.7850 $11,622 $46.4875 $9,298 $37.1900 A-3 Assembly—Worship, Amusement 1,000 $8,144 $53.5763 $6,787 $44.6469 $5,429 $35.7175 - Arcade, Church, Community Hall 5,000 $10,287 $60.0000 $8,573 $50.0000 $6,858 $40.0000 - - 10,000 $13,287 $47.1600 $11,073 $39.3000 $8,858 $31.4400 - - 20,000 $18,003 $9.9900 $15,003 $8.3250 $12,002 $6.6600 - - 50,000 $21,000 $10.2900 $17,500 $8.5750 $14,000 $6.8600 - - 100,000 $26,145 $26.1450 $21,788 $21.7875 $17,430 $17.4300 A-4 Assembly—Indoor Sport Viewing 500 $4,960 $65.2650 $4,133 $54.3875 $3,307 $43.5100 - Arena, Skating Rink, Tennis Court 2,500 $6,265 $73.0800 $5,221 $60.9000 $4,177 $48.7200 - - 5,000 $8,092 $57.4440 $6,744 $47.8700 $5,395 $38.2960 - - 10,000 $10,964 $12.1840 $9,137 $10.1533 $7,310 $8.1227 - - 25,000 $12,792 $12.5280 $10,660 $10.4400 $8,528 $8.3520 - - 50,000 $15,924 $31.8480 $13,270 $26.5400 $10,616 $21.2320 A-5 Assembly—Outdoor Activities 500 $5,248 $69.0600 $4,373 $57.5500 $3,499 $46.0400 - Amusement Park, Bleacher, Stadium 2,500 $6,629 $77.3400 $5,524 $64.4500 $4,420 $51.5600 - - 5,000 $8,563 $60.7650 $7,136 $50.6375 $5,709 $40.5100 - - 10,000 $11,601 $12.8850 $9,668 $10.7375 $7,734 $8.5900 - - 25,000 $13,534 $13.2750 $11,278 $11.0625 $9,023 $8.8500 - - 50,000 $16,853 $33.7050 $14,044 $28.0875 $11,235 $22.4700 A A Occupancy Tenant Improvements 500 $3,304 $43.4738 $2,753 $36.2281 $2,203 $28.9825 - - 2,500 $4,173 $48.6750 $3,478 $40.5625 $2,782 $32.4500 - - 5,000 $5,390 $38.2650 $4,492 $31.8875 $3,594 $25.5100 - - 10,000 $7,304 $8.1100 $6,086 $6.7583 $4,869 $5.4067 - - 25,000 $8,520 $8.3400 $7,100 $6.9500 $5,680 $5.5600 - - 50,000 $10,605 $21.2100 $8,838 $17.6750 $7,070 $14.1400 B Business—Bank 500 $4,480 $58.9388 $3,733 $49.1156 $2,987 $39.2925 - - 2,500 $5,659 $66.0300 $4,716 $55.0250 $3,773 $44.0200 - - 5,000 $7,310 $51.8700 $6,091 $43.2250 $4,873 $34.5800 - - 10,000 $9,903 $11.0050 $8,253 $9.1708 $6,602 $7.3367 - - 25,000 $11,554 $11.3250 $9,628 $9.4375 $7,703 $7.5500 - - 50,000 $14,385 $28.7700 $11,988 $23.9750 $9,590 $19.1800 B Business—Laundromat 200 $3,848 $126.5738 $3,207 $105.4781 $2,565 $84.3825 - - 1,000 $4,860 $141.7650 $4,050 $118.1375 $3,240 $94.5100 - - 2,000 $6,278 $111.3750 $5,232 $92.8125 $4,185 $74.2500 - - 4,000 $8,506 $23.6400 $7,088 $19.7000 $5,670 $15.7600 - - 10,000 $9,924 $24.3000 $8,270 $20.2500 $6,616 $16.2000 - - 20,000 $12,354 $61.7700 $10,295 $51.4750 $8,236 $41.1800 B Business—Clinic, Outpatient 500 $4,616 $60.7275 $3,847 $50.6063 $3,077 $40.4850 - - 2,500 $5,831 $68.0400 $4,859 $56.7000 $3,887 $45.3600 - - 5,000 $7,532 $53.4300 $6,276 $44.5250 $5,021 $35.6200 - - 10,000 $10,203 $11.3300 $8,503 $9.4417 $6,802 $7.5533 - - 25,000 $11,903 $11.6700 $9,919 $9.7250 $7,935 $7.7800 - - 50,000 $14,820 $29.6400 $12,350 $24.7000 $9,880 $19.7600 B Business—Professional Office 1,000 $5,097 $49.7663 $4,247 $41.4719 $3,398 $33.1775 - - 5,000 $7,088 $42.8100 $5,906 $35.6750 $4,725 $28.5400 - - 10,000 $9,228 $30.2700 $7,690 $25.2250 $6,152 $20.1800 - - 20,000 $12,255 $7.1500 $10,213 $5.9583 $8,170 $4.7667 - - 50,000 $14,400 $7.6800 $12,000 $6.4000 $9,600 $5.1200 - - 100,000 $18,240 $18.2400 $15,200 $15.2000 $12,160 $12.1600
CITY OF CUPERTINO, CA
Building Division
Schedule of New Construction Fees
PLAN CHECK FEES ONLY
1567
CC 05-19-2022
1567 of 1613
New Construction - Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
B B Occupancy Tenant Improvements 300 $3,534 $77.4900 $2,945 $64.5750 $2,356 $51.6600 - - 1,500 $4,464 $86.7900 $3,720 $72.3250 $2,976 $57.8600 - - 3,000 $5,765 $68.1900 $4,805 $56.8250 $3,844 $45.4600 - - 6,000 $7,811 $14.4600 $6,509 $12.0500 $5,207 $9.6400 - - 15,000 $9,113 $14.8800 $7,594 $12.4000 $6,075 $9.9200 - - 30,000 $11,345 $37.8150 $9,454 $31.5125 $7,563 $25.2100 E Educational— Preschool / School 100 $3,804 $250.2563 $3,170 $208.5469 $2,536 $166.8375 - - 500 $4,805 $280.2600 $4,004 $233.5500 $3,203 $186.8400 - - 1,000 $6,206 $220.2300 $5,172 $183.5250 $4,137 $146.8200 - - 2,000 $8,408 $46.7200 $7,007 $38.9333 $5,606 $31.1467 - - 5,000 $9,810 $48.0300 $8,175 $40.0250 $6,540 $32.0200 10,000 $12,212 $122.1150 $10,176 $101.7625 $8,141 $81.4100 E E Occupancy Tenant Improvements 100 $2,988 $196.5675 $2,490 $163.8063 $1,992 $131.0450 - - 500 $3,774 $220.1700 $3,145 $183.4750 $2,516 $146.7800 - - 1,000 $4,875 $172.9800 $4,063 $144.1500 $3,250 $115.3200 - - 2,000 $6,605 $36.6900 $5,504 $30.5750 $4,403 $24.4600 - - 5,000 $7,706 $37.7400 $6,421 $31.4500 $5,137 $25.1600 - - 10,000 $9,593 $95.9250 $7,994 $79.9375 $6,395 $63.9500 F-1 Factory Industrial—Moderate Hazard 1,000 $4,668 $13.3170 $3,890 $11.0975 $3,112 $8.8780 - - 5,000 $5,200 $21.3000 $4,334 $17.7500 $3,467 $14.2000 - - 10,000 $6,265 $23.0760 $5,221 $19.2300 $4,177 $15.3840 - - 20,000 $8,573 $3.5440 $7,144 $2.9533 $5,715 $2.3627 - - 50,000 $9,636 $2.1360 $8,030 $1.7800 $6,424 $1.4240 100,000 $10,704 $10.7040 $8,920 $8.9200 $7,136 $7.1360
F-2 Factory Industrial—Low Hazard 1,000 $4,800 $31.5825 $4,000 $26.3188 $3,200 $21.0550 - - 5,000 $6,063 $35.3700 $5,053 $29.4750 $4,042 $23.5800 - - 10,000 $7,832 $27.7950 $6,526 $23.1625 $5,221 $18.5300 - - 20,000 $10,611 $5.8800 $8,843 $4.9000 $7,074 $3.9200 - - 50,000 $12,375 $6.0600 $10,313 $5.0500 $8,250 $4.0400 - - 100,000 $15,405 $15.4050 $12,838 $12.8375 $10,270 $10.2700 F F Occupancy Tenant Improvements 1,000 $3,513 $23.1180 $2,928 $19.2650 $2,342 $15.4120 - - 5,000 $4,438 $25.8840 $3,699 $21.5700 $2,959 $17.2560 - - 10,000 $5,732 $20.3400 $4,777 $16.9500 $3,822 $13.5600 - - 20,000 $7,766 $4.3120 $6,472 $3.5933 $5,178 $2.8747 - - 50,000 $9,060 $4.4400 $7,550 $3.7000 $6,040 $2.9600 - - 100,000 $11,280 $11.2800 $9,400 $9.4000 $7,520 $7.5200 H-1 High Hazard Group H-1 100 $3,562 $234.3650 $2,969 $195.3042 $2,375 $156.2433 - - 500 $4,500 $262.5000 $3,750 $218.7500 $3,000 $175.0000 - - 1,000 $5,812 $206.2400 $4,844 $171.8667 $3,875 $137.4933 - - 2,000 $7,875 $43.7567 $6,562 $36.4639 $5,250 $29.1711 - - 5,000 $9,188 $44.9900 $7,656 $37.4917 $6,125 $29.9933 - - 10,000 $11,437 $114.3700 $9,531 $95.3083 $7,625 $76.2467 H-2 High Hazard Group H-2 100 $4,275 $281.2380 $3,562 $234.3650 $2,850 $187.4920 - - 500 $5,400 $315.0000 $4,500 $262.5000 $3,600 $210.0000 - - 1,000 $6,975 $247.4880 $5,812 $206.2400 $4,650 $164.9920 - - 2,000 $9,450 $52.5080 $7,875 $43.7567 $6,300 $35.0053 - - 5,000 $11,025 $53.9880 $9,188 $44.9900 $7,350 $35.9920 - - 10,000 $13,724 $137.2440 $11,437 $114.3700 $9,150 $91.4960 H-3 High Hazard Group H-3 100 $4,664 $306.8175 $3,886 $255.6813 $3,109 $204.5450 - - 500 $5,891 $343.6350 $4,909 $286.3625 $3,927 $229.0900 - - 1,000 $7,609 $270.0000 $6,341 $225.0000 $5,073 $180.0000 - - 2,000 $10,309 $57.2850 $8,591 $47.7375 $6,873 $38.1900 - - 5,000 $12,028 $58.9050 $10,023 $49.0875 $8,019 $39.2700 - - 10,000 $14,973 $149.7300 $12,478 $124.7750 $9,982 $99.8200 H-4 High Hazard Group H-4 100 $3,731 $245.4540 $3,109 $204.5450 $2,487 $163.6360 - - 500 $4,713 $274.9080 $3,927 $229.0900 $3,142 $183.2720 - - 1,000 $6,087 $216.0000 $5,073 $180.0000 $4,058 $144.0000 - - 2,000 $8,247 $45.8280 $6,873 $38.1900 $5,498 $30.5520 - - 5,000 $9,622 $47.1240 $8,019 $39.2700 $6,415 $31.4160 - - 10,000 $11,978 $119.7840 $9,982 $99.8200 $7,986 $79.8560 H-5 High Hazard Group H-5 100 $3,731 $245.4540 $3,109 $204.5450 $2,487 $163.6360 - - 500 $4,713 $274.9080 $3,927 $229.0900 $3,142 $183.2720 - - 1,000 $6,087 $216.0000 $5,073 $180.0000 $4,058 $144.0000 - - 2,000 $8,247 $45.8280 $6,873 $38.1900 $5,498 $30.5520 - - 5,000 $9,622 $47.1240 $8,019 $39.2700 $6,415 $31.4160 - - 10,000 $11,978 $119.7840 $9,982 $99.8200 $7,986 $79.8560 1568
CC 05-19-2022
1568 of 1613
New Construction - Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
H H Occupancy Tenant Improvements 100 $2,752 $181.0440 $2,293 $150.8700 $1,835 $120.6960 - - 500 $3,476 $202.7880 $2,897 $168.9900 $2,317 $135.1920 - - 1,000 $4,490 $159.3240 $3,742 $132.7700 $2,993 $106.2160 - - 2,000 $6,083 $33.7840 $5,069 $28.1533 $4,056 $22.5227 - - 5,000 $7,097 $34.7760 $5,914 $28.9800 $4,731 $23.1840 - - 10,000 $8,836 $88.3560 $7,363 $73.6300 $5,890 $58.9040 I-1 Institutional—7+ persons, ambulatory 500 $4,676 $61.5270 $3,896 $51.2725 $3,117 $41.0180 - - 2,500 $5,906 $68.8920 $4,922 $57.4100 $3,937 $45.9280 - - 5,000 $7,628 $54.1440 $6,357 $45.1200 $5,086 $36.0960 - - 10,000 $10,336 $11.4760 $8,613 $9.5633 $6,890 $7.6507 - - 25,000 $12,057 $11.8200 $10,048 $9.8500 $8,038 $7.8800 - - 50,000 $15,012 $30.0240 $12,510 $25.0200 $10,008 $20.0160 I-2 Institutional—6+ persons, non-ambulatory 500 $5,663 $74.5200 $4,720 $62.1000 $3,776 $49.6800 - - 2,500 $7,154 $83.4450 $5,962 $69.5375 $4,769 $55.6300 - - 5,000 $9,240 $65.5800 $7,700 $54.6500 $6,160 $43.7200 - - 10,000 $12,519 $13.9150 $10,433 $11.5958 $8,346 $9.2767 - - 25,000 $14,606 $14.2950 $12,172 $11.9125 $9,738 $9.5300 - - 50,000 $18,180 $36.3600 $15,150 $30.3000 $12,120 $24.2400 I-3 Institutional—6+ persons, restrained 500 $5,210 $68.5575 $4,342 $57.1313 $3,474 $45.7050 - - 2,500 $6,582 $76.7850 $5,485 $63.9875 $4,388 $51.1900 - - 5,000 $8,501 $60.3450 $7,084 $50.2875 $5,668 $40.2300 - - 10,000 $11,519 $12.7850 $9,599 $10.6542 $7,679 $8.5233 - - 25,000 $13,436 $13.1550 $11,197 $10.9625 $8,958 $8.7700 50,000 $16,725 $33.4500 $13,938 $27.8750 $11,150 $22.3000 I-4 Institutional—6+ persons, day care 500 $5,210 $68.5575 $4,342 $57.1313 $3,474 $45.7050 - - 2,500 $6,582 $76.7850 $5,485 $63.9875 $4,388 $51.1900 - - 5,000 $8,501 $60.3450 $7,084 $50.2875 $5,668 $40.2300 - - 10,000 $11,519 $12.7850 $9,599 $10.6542 $7,679 $8.5233 - - 25,000 $13,436 $13.1550 $11,197 $10.9625 $8,958 $8.7700 50,000 $16,725 $33.4500 $13,938 $27.8750 $11,150 $22.3000 I I Occupancy Tenant Improvements 100 $2,755 $181.2420 $2,296 $151.0350 $1,837 $120.8280 - - 500 $3,480 $202.9920 $2,900 $169.1600 $2,320 $135.3280 - - 1,000 $4,495 $159.4920 $3,746 $132.9100 $2,997 $106.3280 - - 2,000 $6,090 $33.8280 $5,075 $28.1900 $4,060 $22.5520 - - 5,000 $7,105 $34.8120 $5,921 $29.0100 $4,736 $23.2080 10,000 $8,845 $88.4520 $7,371 $73.7100 $5,897 $58.9680
M Mercantile 2,000 $7,336 $24.1238 $6,113 $20.1031 $4,890 $16.0825 - - 10,000 $9,266 $27.0450 $7,721 $22.5375 $6,177 $18.0300 - - 20,000 $11,970 $21.2400 $9,975 $17.7000 $7,980 $14.1600 - - 40,000 $16,218 $4.4950 $13,515 $3.7458 $10,812 $2.9967 - - 100,000 $18,915 $4.6350 $15,763 $3.8625 $12,610 $3.0900 - - 200,000 $23,550 $11.7750 $19,625 $9.8125 $15,700 $7.8500 M M Occupancy Tenant Improvements 300 $3,260 $71.4900 $2,717 $59.5750 $2,173 $47.6600 - - 1,500 $4,118 $80.0550 $3,431 $66.7125 $2,745 $53.3700 - - 3,000 $5,319 $62.9250 $4,432 $52.4375 $3,546 $41.9500 - - 6,000 $7,206 $13.3300 $6,005 $11.1083 $4,804 $8.8867 - - 15,000 $8,406 $13.7400 $7,005 $11.4500 $5,604 $9.1600 - - 30,000 $10,467 $34.8900 $8,723 $29.0750 $6,978 $23.2600 R-1 Residential—Hotels & Motels 3,000 $10,880 $4.7700 $9,067 $3.9750 $7,253 $3.1800 - - 15,000 $11,453 $15.2700 $9,544 $12.7250 $7,635 $10.1800 - - 30,000 $13,743 $1.9200 $11,453 $1.6000 $9,162 $1.2800 - - 60,000 $14,319 $2.5400 $11,933 $2.1167 $9,546 $1.6933 - - 150,000 $16,605 $0.3900 $13,838 $0.3250 $11,070 $0.2600 - - 300,000 $17,190 $5.7300 $14,325 $4.7750 $11,460 $3.8200 R-2 Residential—Apartment Building 800 $9,879 $16.2525 $8,232 $13.5438 $6,586 $10.8350 - - 4,000 $10,399 $51.9750 $8,666 $43.3125 $6,932 $34.6500 - - 8,000 $12,478 $6.5100 $10,398 $5.4250 $8,318 $4.3400 - - 16,000 $12,998 $8.6650 $10,832 $7.2208 $8,666 $5.7767 - - 40,000 $15,078 $1.3050 $12,565 $1.0875 $10,052 $0.8700 - - 80,000 $15,600 $19.5000 $13,000 $16.2500 $10,400 $13.0000 R-3 Dwellings—Custom Homes, Models, First Master Plan 1,000 $4,950 $14.7750 $4,125 $12.3125 $3,300 $9.8500 - - 2,500 $5,172 $59.1850 $4,310 $49.3208 $3,448 $39.4567 - - 4,000 $6,059 $11.0850 $5,050 $9.2375 $4,040 $7.3900 - - 6,000 $6,281 $44.3850 $5,234 $36.9875 $4,187 $29.5900 - - 8,000 $7,169 $11.0850 $5,974 $9.2375 $4,779 $7.3900 - - 10,000 $7,391 $73.9050 $6,159 $61.5875 $4,927 $49.2700 1569
CC 05-19-2022
1569 of 1613
New Construction - Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
R-3 Dwellings—Production Phase 1,000 $1,922 $6.7400 $1,602 $5.6167 $1,282 $4.4933 - of Master Plan (repeats) 2,500 $2,024 $26.9800 $1,686 $22.4833 $1,349 $17.9867 - - 4,000 $2,428 $5.0850 $2,024 $4.2375 $1,619 $3.3900
- - 6,000 $2,530 $20.2050 $2,108 $16.8375 $1,687 $13.4700 - - 8,000 $2,934 $5.1000 $2,445 $4.2500 $1,956 $3.4000
- - 10,000 $3,036 $30.3600 $2,530 $25.3000 $2,024 $20.2400 R-3 Dwellings—Alternate Materials 1,000 $4,382 $15.3750 $3,651 $12.8125 $2,921 $10.2500 - - 2,500 $4,612 $61.4850 $3,843 $51.2375 $3,075 $40.9900 - - 4,000 $5,534 $11.5500 $4,612 $9.6250 $3,690 $7.7000 - - 6,000 $5,765 $46.1100 $4,805 $38.4250 $3,844 $30.7400 - - 8,000 $6,688 $11.5200 $5,573 $9.6000 $4,458 $7.6800 - - 10,000 $6,918 $69.1800 $5,765 $57.6500 $4,612 $46.1200 R-3 Dwellings—Hillside - Custom Homes, Models 1,000 $5,787 $20.3050 $4,822 $16.9208 $3,858 $13.5367 - First Master Plan 2,500 $6,091 $81.2050 $5,076 $67.6708 $4,061 $54.1367 - - 4,000 $7,309 $15.2400 $6,091 $12.7000 $4,873 $10.1600 - - 6,000 $7,614 $60.9000 $6,345 $50.7500 $5,076 $40.6000 - - 8,000 $8,832 $15.2250 $7,360 $12.6875 $5,888 $10.1500 - - 10,000 $9,137 $91.3650 $7,614 $76.1375 $6,091 $60.9100 R-3 Dwellings—Hillside - Production Phase 1,000 $1,922 $6.7400 $1,602 $5.6167 $1,282 $4.4933 - of Master Plan (repeats) 2,500 $2,024 $26.9800 $1,686 $22.4833 $1,349 $17.9867 - - 4,000 $2,428 $5.0850 $2,024 $4.2375 $1,619 $3.3900
- - 6,000 $2,530 $20.2050 $2,108 $16.8375 $1,687 $13.4700 - - 8,000 $2,934 $5.1000 $2,445 $4.2500 $1,956 $3.4000
- - 10,000 $3,036 $30.3600 $2,530 $25.3000 $2,024 $20.2400 R-3 Dwellings—Hillside - Alternate Materials 1,000 $4,382 $15.3750 $3,651 $12.8125 $2,921 $10.2500 - - 2,500 $4,612 $61.4850 $3,843 $51.2375 $3,075 $40.9900 - - 4,000 $5,534 $11.5500 $4,612 $9.6250 $3,690 $7.7000 - - 6,000 $5,765 $46.1100 $4,805 $38.4250 $3,844 $30.7400 - - 8,000 $6,688 $11.5200 $5,573 $9.6000 $4,458 $7.6800 - - 10,000 $6,918 $69.1800 $5,765 $57.6500 $4,612 $46.1200 R-3 Group Care 1,000 $8,184 $10.7663 $6,820 $8.9719 $5,456 $7.1775 - - 5,000 $8,615 $34.4700 $7,179 $28.7250 $5,743 $22.9800 - - 10,000 $10,338 $4.2900 $8,615 $3.5750 $6,892 $2.8600 - - 20,000 $10,767 $5.7350 $8,973 $4.7792 $7,178 $3.8233 - - 50,000 $12,488 $0.8550 $10,406 $0.7125 $8,325 $0.5700 - - 100,000 $12,915 $12.9150 $10,763 $10.7625 $8,610 $8.6100 R-4 Group Care 100 $4,619 $60.7725 $3,849 $50.6438 $3,079 $40.5150 - - 500 $4,862 $194.4900 $4,052 $162.0750 $3,241 $129.6600 - - 1,000 $5,834 $24.3000 $4,862 $20.2500 $3,890 $16.2000 - - 2,000 $6,077 $32.4200 $5,065 $27.0167 $4,052 $21.6133 - - 5,000 $7,050 $4.8600 $5,875 $4.0500 $4,700 $3.2400
10,000 $7,293 $72.9300 $6,078 $60.7750 $4,862 $48.6200
R R Occupancy Tenant Improvements 80 $2,692 $44.2688 $2,243 $36.8906 $1,794 $29.5125 - - 400 $2,833 $141.6750 $2,361 $118.0625 $1,889 $94.4500 - - 800 $3,400 $17.7150 $2,833 $14.7625 $2,267 $11.8100 - - 1,600 $3,542 $23.6050 $2,951 $19.6708 $2,361 $15.7367 - - 4,000 $4,108 $3.5550 $3,424 $2.9625 $2,739 $2.3700
- - 8,000 $4,250 $53.1300 $3,542 $44.2750 $2,834 $35.4200 S-1 Storage—Moderate Hazard 600 $3,766 $41.2980 $3,139 $34.4150 $2,511 $27.5320 - - 3,000 $4,757 $46.2600 $3,965 $38.5500 $3,172 $30.8400 - - 6,000 $6,145 $36.3480 $5,121 $30.2900 $4,097 $24.2320 - - 12,000 $8,326 $7.7040 $6,938 $6.4200 $5,551 $5.1360 - - 30,000 $9,713 $7.9200 $8,094 $6.6000 $6,475 $5.2800 - - 60,000 $12,089 $20.1480 $10,074 $16.7900 $8,059 $13.4320 S-2 Storage—Low Hazard 10,000 $8,696 $5.7113 $7,246 $4.7594 $5,797 $3.8075 - - 50,000 $10,980 $6.4200 $9,150 $5.3500 $7,320 $4.2800 - - 100,000 $14,190 $5.0400 $11,825 $4.2000 $9,460 $3.3600 - - 200,000 $19,230 $1.0650 $16,025 $0.8875 $12,820 $0.7100 - - 500,000 $22,425 $1.0950 $18,688 $0.9125 $14,950 $0.7300 - - 1,000,000 $27,900 $2.7900 $23,250 $2.3250 $18,600 $1.8600 S S Occupancy Tenant Improvements 600 $3,398 $37.2488 $2,831 $31.0406 $2,265 $24.8325 - - 3,000 $4,292 $41.7450 $3,576 $34.7875 $2,861 $27.8300 - - 6,000 $5,544 $32.7900 $4,620 $27.3250 $3,696 $21.8600 - - 12,000 $7,511 $6.9450 $6,260 $5.7875 $5,008 $4.6300 - - 30,000 $8,762 $7.1550 $7,301 $5.9625 $5,841 $4.7700 60,000 $10,908 $18.1800 $9,090 $15.1500 $7,272 $12.1200 1570
CC 05-19-2022
1570 of 1613
New Construction - Plan Check Fees
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
U Accessory—Private Garage / 40 $928 $152.6213 $773 $127.1844 $619 $101.7475 - Agricultural Building 200 $1,172 $170.9400 $977 $142.4500 $781 $113.9600 - - 400 $1,514 $134.3100 $1,262 $111.9250 $1,009 $89.5400 - - 800 $2,051 $28.4850 $1,709 $23.7375 $1,368 $18.9900 - - 2,000 $2,393 $29.2950 $1,994 $24.4125 $1,595 $19.5300 - - 4,000 $2,979 $74.4750 $2,483 $62.0625 $1,986 $49.6500 - Deferred Submittal - All Except R-3 1,000 $725 $4.7700 $604 $3.9750 $483 $3.1800 - - 5,000 $916 $5.3550 $763 $4.4625 $611 $3.5700
- - 10,000 $1,184 $4.1850 $986 $3.4875 $789 $2.7900
- - 20,000 $1,602 $0.8850 $1,335 $0.7375 $1,068 $0.5900 - - 50,000 $1,868 $0.9150 $1,556 $0.7625 $1,245 $0.6100 - - 100,000 $2,325 $2.3250 $1,938 $1.9375 $1,550 $1.5500 - Deferred Submittal - R-3 1,000 $725 $12.7200 $604 $10.6000 $483 $8.4800 - - 2,500 $916 $17.7900 $763 $14.8250 $611 $11.8600
- - 4,000 $1,183 $21.0150 $986 $17.5125 $788 $14.0100
- - 6,000 $1,603 $13.3350 $1,336 $11.1125 $1,069 $8.8900 - - 8,000 $1,870 $22.9200 $1,558 $19.1000 $1,246 $15.2800 - - 10,000 $2,328 $23.2800 $1,940 $19.4000 $1,552 $15.5200 - Standard Comm. Foundation 500 $2,985 $7.8488 $2,487 $6.5406 $1,990 $5.2325 - w/o Podium 2,500 $3,142 $25.1400 $2,618 $20.9500 $2,095 $16.7600 - - 5,000 $3,770 $3.1350 $3,142 $2.6125 $2,514 $2.0900
- - 10,000 $3,927 $4.1950 $3,273 $3.4958 $2,618 $2.7967 - - 25,000 $4,556 $0.6150 $3,797 $0.5125 $3,038 $0.4100 - - 50,000 $4,710 $9.4200 $3,925 $7.8500 $3,140 $6.2800
SHELL BUILDINGS
- All Shell Buildings 500 $2,896 $38.1120 $2,413 $31.7600 $1,931 $25.4080 - - 2,500 $3,658 $42.6720 $3,049 $35.5600 $2,439 $28.4480 - - 5,000 $4,725 $33.5400 $3,938 $27.9500 $3,150 $22.3600 - - 10,000 $6,402 $7.1200 $5,335 $5.9333 $4,268 $4.7467 - - 25,000 $7,470 $7.3200 $6,225 $6.1000 $4,980 $4.8800 - - 50,000 $9,300 $18.6000 $7,750 $15.5000 $6,200 $12.4000 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 1571
CC 05-19-2022
1571 of 1613
INSPECTION – NEW CONSTRUCTION FEE SCHEDULE
1572
CC 05-19-2022
1572 of 1613
Inspection - New Construction Fee Schedule
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
A-1 Assembly—Fixed Seating 1,000 $3,557 $28.9450 $2,964 $24.1208 $2,371 $19.2967 - Theater, Concert Hall 5,000 $4,715 $31.4300 $3,929 $26.1917 $3,143 $20.9533 - - 10,000 $6,286 $14.0600 $5,238 $11.7167 $4,191 $9.3733 - - 20,000 $7,692 $4.1433 $6,410 $3.4528 $5,128 $2.7622 - - 50,000 $8,935 $6.9500 $7,446 $5.7917 $5,957 $4.6333 - - 100,000 $12,410 $12.4100 $10,342 $10.3417 $8,273 $8.2733 A-2 Assembly—Food & Drink 250 $3,138 $102.1838 $2,615 $85.1531 $2,092 $68.1225 - Restaurant, Night Club, Bar 1,250 $4,160 $110.9250 $3,467 $92.4375 $2,773 $73.9500 - - 2,500 $5,547 $49.6350 $4,622 $41.3625 $3,698 $33.0900 - - 5,000 $6,788 $14.6000 $5,656 $12.1667 $4,525 $9.7333 - - 12,500 $7,883 $24.5100 $6,569 $20.4250 $5,255 $16.3400 - - 25,000 $10,946 $43.7850 $9,122 $36.4875 $7,298 $29.1900 A-3 Assembly—Worship, Amusement 1,000 $5,335 $43.4175 $4,446 $36.1813 $3,557 $28.9450 - Arcade, Church, Community Hall 5,000 $7,072 $47.1450 $5,893 $39.2875 $4,715 $31.4300 - - 10,000 $9,429 $21.0900 $7,858 $17.5750 $6,286 $14.0600 - - 20,000 $11,538 $6.2150 $9,615 $5.1792 $7,692 $4.1433 - - 50,000 $13,403 $10.4250 $11,169 $8.6875 $8,935 $6.9500 - - 100,000 $18,615 $18.6150 $15,513 $15.5125 $12,410 $12.4100 A-4 Assembly—Indoor Sport Viewing 500 $3,088 $50.2740 $2,573 $41.8950 $2,059 $33.5160 - Arena, Skating Rink, Tennis Court 2,500 $4,094 $54.5880 $3,411 $45.4900 $2,729 $36.3920 - - 5,000 $5,458 $24.4200 $4,549 $20.3500 $3,639 $16.2800 - - 10,000 $6,679 $7.1720 $5,566 $5.9767 $4,453 $4.7813 - - 25,000 $7,755 $12.0600 $6,463 $10.0500 $5,170 $8.0400 - - 50,000 $10,770 $21.5400 $8,975 $17.9500 $7,180 $14.3600 A-5 Assembly—Outdoor Activities 500 $3,389 $55.1775 $2,824 $45.9813 $2,260 $36.7850 - Amusement Park, Bleacher, Stadium 2,500 $4,493 $59.8950 $3,744 $49.9125 $2,995 $39.9300 - - 5,000 $5,990 $26.8050 $4,992 $22.3375 $3,994 $17.8700 - - 10,000 $7,331 $7.8800 $6,109 $6.5667 $4,887 $5.2533 - - 25,000 $8,513 $13.2300 $7,094 $11.0250 $5,675 $8.8200 - - 50,000 $11,820 $23.6400 $9,850 $19.7000 $7,880 $15.7600 A A Occupancy Tenant Improvements 500 $3,389 $55.1775 $2,824 $45.9813 $2,260 $36.7850 - - 2,500 $4,493 $59.8950 $3,744 $49.9125 $2,995 $39.9300 - - 5,000 $5,990 $26.8050 $4,992 $22.3375 $3,994 $17.8700 - - 10,000 $7,331 $7.8800 $6,109 $6.5667 $4,887 $5.2533 - - 25,000 $8,513 $13.2300 $7,094 $11.0250 $5,675 $8.8200 - - 50,000 $11,820 $23.6400 $9,850 $19.7000 $7,880 $15.7600 B Business—Bank 500 $3,515 $57.2288 $2,929 $47.6906 $2,343 $38.1525 - - 2,500 $4,659 $62.1150 $3,883 $51.7625 $3,106 $41.4100 - - 5,000 $6,212 $27.7950 $5,177 $23.1625 $4,142 $18.5300 - - 10,000 $7,602 $8.1700 $6,335 $6.8083 $5,068 $5.4467 - - 25,000 $8,828 $13.7400 $7,356 $11.4500 $5,885 $9.1600 - - 50,000 $12,263 $24.5250 $10,219 $20.4375 $8,175 $16.3500 B Business—Laundromat 200 $3,138 $127.7138 $2,615 $106.4281 $2,092 $85.1425 - - 1,000 $4,160 $138.6750 $3,467 $115.5625 $2,773 $92.4500 - - 2,000 $5,547 $62.0250 $4,622 $51.6875 $3,698 $41.3500 - - 4,000 $6,787 $18.2550 $5,656 $15.2125 $4,525 $12.1700 - - 10,000 $7,883 $30.6450 $6,569 $25.5375 $5,255 $20.4300 - - 20,000 $10,947 $54.7350 $9,123 $45.6125 $7,298 $36.4900 B Business—Clinic, Outpatient 500 $3,578 $58.2338 $2,981 $48.5281 $2,385 $38.8225 - - 2,500 $4,742 $63.2400 $3,952 $52.7000 $3,162 $42.1600 - - 5,000 $6,323 $28.2750 $5,269 $23.5625 $4,216 $18.8500 - - 10,000 $7,737 $8.3200 $6,448 $6.9333 $5,158 $5.5467 - - 25,000 $8,985 $13.9800 $7,488 $11.6500 $5,990 $9.3200 - - 50,000 $12,480 $24.9600 $10,400 $20.8000 $8,320 $16.6400 B Business—Professional Office 1,000 $4,770 $38.8275 $3,975 $32.3563 $3,180 $25.8850 - - 5,000 $6,323 $42.1650 $5,269 $35.1375 $4,216 $28.1100 - - 10,000 $8,432 $18.8550 $7,026 $15.7125 $5,621 $12.5700 - - 20,000 $10,317 $5.5350 $8,598 $4.6125 $6,878 $3.6900 - - 50,000 $11,978 $9.3150 $9,981 $7.7625 $7,985 $6.2100 - - 100,000 $16,635 $16.6350 $13,863 $13.8625 $11,090 $11.0900 B B Occupancy Tenant Improvements 300 $2,762 $74.9250 $2,301 $62.4375 $1,841 $49.9500 - - 1,500 $3,661 $81.3600 $3,051 $67.8000 $2,441 $54.2400 - - 3,000 $4,881 $36.4050 $4,068 $30.3375 $3,254 $24.2700 - - 6,000 $5,973 $10.7050 $4,978 $8.9208 $3,982 $7.1367 - - 15,000 $6,937 $17.9850 $5,781 $14.9875 $4,625 $11.9900 - - 30,000 $9,635 $32.1150 $8,029 $26.7625 $6,423 $21.4100
CITY OF CUPERTINO, CA
Building Division
Schedule of New Construction Fees
INSPECTION FEES ONLY
1573
CC 05-19-2022
1573 of 1613
Inspection - New Construction Fee Schedule
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
E Educational— Preschool / School 100 $2,699 $219.6713 $2,249 $183.0594 $1,799 $146.4475 - - 500 $3,578 $238.5150 $2,981 $198.7625 $2,385 $159.0100 - - 1,000 $4,770 $106.6950 $3,975 $88.9125 $3,180 $71.1300 - - 2,000 $5,837 $31.3800 $4,864 $26.1500 $3,891 $20.9200 - - 5,000 $6,779 $52.7100 $5,649 $43.9250 $4,519 $35.1400 - - 10,000 $9,414 $94.1400 $7,845 $78.4500 $6,276 $62.7600 E E Occupancy Tenant Improvements 100 $2,511 $204.3450 $2,092 $170.2875 $1,674 $136.2300 - - 500 $3,328 $221.8650 $2,773 $184.8875 $2,219 $147.9100 - - 1,000 $4,437 $99.2700 $3,698 $82.7250 $2,958 $66.1800 - - 2,000 $5,430 $29.2000 $4,525 $24.3333 $3,620 $19.4667 - - 5,000 $6,306 $49.0500 $5,255 $40.8750 $4,204 $32.7000 - - 10,000 $8,759 $87.5850 $7,299 $72.9875 $5,839 $58.3900 F-1 Factory Industrial—Moderate Hazard 1,000 $3,994 $28.8450 $3,328 $24.0375 $2,662 $19.2300 - - 5,000 $5,147 $30.1800 $4,290 $25.1500 $3,432 $20.1200 - - 10,000 $6,656 $15.9720 $5,547 $13.3100 $4,438 $10.6480 - - 20,000 $8,254 $4.4280 $6,878 $3.6900 $5,502 $2.9520 - - 50,000 $9,582 $7.4520 $7,985 $6.2100 $6,388 $4.9680 - - 100,000 $13,308 $13.3080 $11,090 $11.0900 $8,872 $8.8720 F-2 Factory Industrial—Low Hazard 1,000 $4,707 $38.3175 $3,923 $31.9313 $3,138 $25.5450 - - 5,000 $6,240 $41.6100 $5,200 $34.6750 $4,160 $27.7400 - - 10,000 $8,321 $18.6150 $6,934 $15.5125 $5,547 $12.4100 - - 20,000 $10,182 $5.4600 $8,485 $4.5500 $6,788 $3.6400 - - 50,000 $11,820 $9.2100 $9,850 $7.6750 $7,880 $6.1400 - - 100,000 $16,425 $16.4250 $13,688 $13.6875 $10,950 $10.9500 F F Occupancy Tenant Improvements 1,000 $3,163 $25.7520 $2,636 $21.4600 $2,109 $17.1680 - - 5,000 $4,193 $27.9480 $3,495 $23.2900 $2,796 $18.6320 - - 10,000 $5,591 $12.5160 $4,659 $10.4300 $3,727 $8.3440 - - 20,000 $6,842 $3.6720 $5,702 $3.0600 $4,562 $2.4480 - - 50,000 $7,944 $6.1920 $6,620 $5.1600 $5,296 $4.1280 - - 100,000 $11,040 $11.0400 $9,200 $9.2000 $7,360 $7.3600 H-1 High Hazard Group H-1 100 $2,260 $183.9175 $1,883 $153.2646 $1,506 $122.6117 - - 500 $2,995 $199.6800 $2,496 $166.4000 $1,997 $133.1200 - - 1,000 $3,994 $89.3200 $3,328 $74.4333 $2,662 $59.5467 - - 2,000 $4,887 $26.2733 $4,072 $21.8944 $3,258 $17.5156 - - 5,000 $5,675 $44.1400 $4,729 $36.7833 $3,783 $29.4267 - - 10,000 $7,882 $78.8200 $6,568 $65.6833 $5,255 $52.5467 H-2 High Hazard Group H-2 100 $2,711 $220.7010 $2,260 $183.9175 $1,808 $147.1340 - - 500 $3,594 $239.6160 $2,995 $199.6800 $2,396 $159.7440 - - 1,000 $4,792 $107.1840 $3,994 $89.3200 $3,195 $71.4560 - - 2,000 $5,864 $31.5280 $4,887 $26.2733 $3,909 $21.0187 - - 5,000 $6,810 $52.9680 $5,675 $44.1400 $4,540 $35.3120 - - 10,000 $9,458 $94.5840 $7,882 $78.8200 $6,306 $63.0560 H-3 High Hazard Group H-3 100 $3,389 $275.8763 $2,824 $229.8969 $2,260 $183.9175 - - 500 $4,493 $299.5200 $3,744 $249.6000 $2,995 $199.6800 - - 1,000 $5,990 $133.9800 $4,992 $111.6500 $3,994 $89.3200 - - 2,000 $7,330 $39.4100 $6,109 $32.8417 $4,887 $26.2733 - - 5,000 $8,513 $66.2100 $7,094 $55.1750 $5,675 $44.1400 - - 10,000 $11,823 $118.2300 $9,853 $98.5250 $7,882 $78.8200 H-4 High Hazard Group H-4 100 $2,711 $220.7010 $2,260 $183.9175 $1,808 $147.1340 - - 500 $3,594 $239.6160 $2,995 $199.6800 $2,396 $159.7440 - - 1,000 $4,792 $107.1840 $3,994 $89.3200 $3,195 $71.4560 - - 2,000 $5,864 $31.5280 $4,887 $26.2733 $3,909 $21.0187 - - 5,000 $6,810 $52.9680 $5,675 $44.1400 $4,540 $35.3120 - - 10,000 $9,458 $94.5840 $7,882 $78.8200 $6,306 $63.0560 H-5 High Hazard Group H-5 100 $2,711 $220.7010 $2,260 $183.9175 $1,808 $147.1340 - - 500 $3,594 $239.6160 $2,995 $199.6800 $2,396 $159.7440 - - 1,000 $4,792 $107.1840 $3,994 $89.3200 $3,195 $71.4560 - - 2,000 $5,864 $31.5280 $4,887 $26.2733 $3,909 $21.0187 - - 5,000 $6,810 $52.9680 $5,675 $44.1400 $4,540 $35.3120 - - 10,000 $9,458 $94.5840 $7,882 $78.8200 $6,306 $63.0560 H H Occupancy Tenant Improvements 100 $2,159 $175.7370 $1,799 $146.4475 $1,439 $117.1580 - - 500 $2,862 $190.8120 $2,385 $159.0100 $1,908 $127.2080 - - 1,000 $3,816 $85.3560 $3,180 $71.1300 $2,544 $56.9040 - - 2,000 $4,670 $25.1040 $3,891 $20.9200 $3,113 $16.7360 - - 5,000 $5,423 $42.1680 $4,519 $35.1400 $3,615 $28.1120 - - 10,000 $7,531 $75.3120 $6,276 $62.7600 $5,021 $50.2080 I-1 Institutional—7+ persons, ambulatory 500 $3,013 $49.0440 $2,511 $40.8700 $2,008 $32.6960 - - 2,500 $3,994 $53.2560 $3,328 $44.3800 $2,662 $35.5040 - - 5,000 $5,325 $23.8200 $4,438 $19.8500 $3,550 $15.8800 - - 10,000 $6,516 $7.0000 $5,430 $5.8333 $4,344 $4.6667 - - 25,000 $7,566 $11.7840 $6,305 $9.8200 $5,044 $7.8560 - - 50,000 $10,512 $21.0240 $8,760 $17.5200 $7,008 $14.0160 I-2 Institutional—6+ persons, non-ambulatory 500 $3,766 $61.3050 $3,138 $51.0875 $2,511 $40.8700 - - 2,500 $4,992 $66.5700 $4,160 $55.4750 $3,328 $44.3800 - - 5,000 $6,656 $29.7750 $5,547 $24.8125 $4,438 $19.8500 - - 10,000 $8,145 $8.7500 $6,788 $7.2917 $5,430 $5.8333 - - 25,000 $9,458 $14.7300 $7,881 $12.2750 $6,305 $9.8200 - - 50,000 $13,140 $26.2800 $10,950 $21.9000 $8,760 $17.5200 1574
CC 05-19-2022
1574 of 1613
Inspection - New Construction Fee Schedule
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
I-3 Institutional—6+ persons, restrained 500 $3,766 $61.3050 $3,138 $51.0875 $2,511 $40.8700 - - 2,500 $4,992 $66.5700 $4,160 $55.4750 $3,328 $44.3800 - - 5,000 $6,656 $29.7750 $5,547 $24.8125 $4,438 $19.8500 - - 10,000 $8,145 $8.7500 $6,788 $7.2917 $5,430 $5.8333 - - 25,000 $9,458 $14.7300 $7,881 $12.2750 $6,305 $9.8200 - - 50,000 $13,140 $26.2800 $10,950 $21.9000 $8,760 $17.5200 I-4 Institutional—6+ persons, day care 500 $3,766 $61.3050 $3,138 $51.0875 $2,511 $40.8700 - - 2,500 $4,992 $66.5700 $4,160 $55.4750 $3,328 $44.3800 - - 5,000 $6,656 $29.7750 $5,547 $24.8125 $4,438 $19.8500 - - 10,000 $8,145 $8.7500 $6,788 $7.2917 $5,430 $5.8333 - - 25,000 $9,458 $14.7300 $7,881 $12.2750 $6,305 $9.8200 - - 50,000 $13,140 $26.2800 $10,950 $21.9000 $8,760 $17.5200 I I Occupancy Tenant Improvements 100 $2,109 $171.6570 $1,757 $143.0475 $1,406 $114.4380 - - 500 $2,796 $186.3600 $2,330 $155.3000 $1,864 $124.2400 - - 1,000 $3,727 $83.3880 $3,106 $69.4900 $2,485 $55.5920 - - 2,000 $4,561 $24.5200 $3,801 $20.4333 $3,041 $16.3467 - - 5,000 $5,297 $41.2080 $4,414 $34.3400 $3,531 $27.4720 - - 10,000 $7,357 $73.5720 $6,131 $61.3100 $4,905 $49.0480 M Mercantile 2,000 $5,335 $21.7200 $4,446 $18.1000 $3,557 $14.4800 - - 10,000 $7,073 $23.5650 $5,894 $19.6375 $4,715 $15.7100 - - 20,000 $9,429 $10.5450 $7,858 $8.7875 $6,286 $7.0300 - - 40,000 $11,538 $3.0950 $9,615 $2.5792 $7,692 $2.0633 - - 100,000 $13,395 $5.2050 $11,163 $4.3375 $8,930 $3.4700 - - 200,000 $18,600 $9.3000 $15,500 $7.7500 $12,400 $6.2000 M M Occupancy Tenant Improvements 300 $3,138 $85.1475 $2,615 $70.9563 $2,092 $56.7650 - - 1,500 $4,160 $92.4450 $3,467 $77.0375 $2,773 $61.6300 - - 3,000 $5,547 $41.3700 $4,622 $34.4750 $3,698 $27.5800 - - 6,000 $6,788 $12.1550 $5,657 $10.1292 $4,525 $8.1033 - - 15,000 $7,882 $20.4450 $6,568 $17.0375 $5,255 $13.6300 - - 30,000 $10,949 $36.4950 $9,124 $30.4125 $7,299 $24.3300 R-1 Residential—Hotels & Motels 3,000 $8,786 $9.1538 $7,322 $7.6281 $5,857 $6.1025 - - 15,000 $9,884 $7.3350 $8,237 $6.1125 $6,590 $4.8900 - - 30,000 $10,985 $5.4750 $9,154 $4.5625 $7,323 $3.6500 - - 60,000 $12,627 $0.8200 $10,523 $0.6833 $8,418 $0.5467 - - 150,000 $13,365 $1.3500 $11,138 $1.1250 $8,910 $0.9000 - - 300,000 $15,390 $5.1300 $12,825 $4.2750 $10,260 $3.4200 R-2 Residential—Apartment Building 800 $6,922 $27.0375 $5,769 $22.5313 $4,615 $18.0250 - - 4,000 $7,787 $21.6450 $6,490 $18.0375 $5,192 $14.4300 - - 8,000 $8,653 $16.2150 $7,211 $13.5125 $5,769 $10.8100 - - 16,000 $9,950 $2.4150 $8,292 $2.0125 $6,634 $1.6100 - - 40,000 $10,530 $3.9450 $8,775 $3.2875 $7,020 $2.6300 - - 80,000 $12,108 $15.1350 $10,090 $12.6125 $8,072 $10.0900 R-3 Dwellings—Custom Homes, Models, First Master Plan 1,000 $5,325 $44.3600 $4,437 $36.9667 $3,550 $29.5733 - - 2,500 $5,990 $44.3700 $4,992 $36.9750 $3,994 $29.5800 - - 4,000 $6,656 $49.9350 $5,547 $41.6125 $4,437 $33.2900 - - 6,000 $7,655 $22.1550 $6,379 $18.4625 $5,103 $14.7700 - - 8,000 $8,098 $61.0200 $6,748 $50.8500 $5,398 $40.6800 - - 10,000 $9,318 $93.1800 $7,765 $77.6500 $6,212 $62.1200 R-3 Dwellings—Production Phase 1,000 $5,325 $44.3600 $4,437 $36.9667 $3,550 $29.5733 - of Master Plan (repeats) 2,500 $5,990 $44.3700 $4,992 $36.9750 $3,994 $29.5800 - - 4,000 $6,656 $49.9350 $5,547 $41.6125 $4,437 $33.2900 - - 6,000 $7,655 $22.1550 $6,379 $18.4625 $5,103 $14.7700 - - 8,000 $8,098 $61.0200 $6,748 $50.8500 $5,398 $40.6800 - - 10,000 $9,318 $93.1800 $7,765 $77.6500 $6,212 $62.1200 R-3 Dwellings—Alternate Materials 1,000 $5,325 $44.3600 $4,437 $36.9667 $3,550 $29.5733 - - 2,500 $5,990 $44.3700 $4,992 $36.9750 $3,994 $29.5800 - - 4,000 $6,656 $49.9350 $5,547 $41.6125 $4,437 $33.2900 - - 6,000 $7,655 $22.1550 $6,379 $18.4625 $5,103 $14.7700 - - 8,000 $8,098 $61.0200 $6,748 $50.8500 $5,398 $40.6800 - - 10,000 $9,318 $93.1800 $7,765 $77.6500 $6,212 $62.1200 R-3 Dwellings—Hillside - Custom Homes, Models 1,000 $5,502 $45.8550 $4,585 $38.2125 $3,668 $30.5700 - First Master Plan 2,500 $6,190 $45.8450 $5,158 $38.2042 $4,127 $30.5633 - - 4,000 $6,878 $51.5700 $5,732 $42.9750 $4,585 $34.3800 - - 6,000 $7,909 $22.9200 $6,591 $19.1000 $5,273 $15.2800 - - 8,000 $8,368 $63.0450 $6,973 $52.5375 $5,578 $42.0300 - - 10,000 $9,629 $96.2850 $8,024 $80.2375 $6,419 $64.1900 R-3 Dwellings—Hillside - Production Phase 1,000 $5,502 $45.8550 $4,585 $38.2125 $3,668 $30.5700 - of Master Plan (repeats) 2,500 $6,190 $45.8450 $5,158 $38.2042 $4,127 $30.5633 - - 4,000 $6,878 $51.5700 $5,732 $42.9750 $4,585 $34.3800 - - 6,000 $7,909 $22.9200 $6,591 $19.1000 $5,273 $15.2800 - - 8,000 $8,368 $63.0450 $6,973 $52.5375 $5,578 $42.0300 - - 10,000 $9,629 $96.2850 $8,024 $80.2375 $6,419 $64.1900 R-3 Dwellings—Hillside - Alternate Materials 1,000 $5,502 $45.8550 $4,585 $38.2125 $3,668 $30.5700 - - 2,500 $6,190 $45.8450 $5,158 $38.2042 $4,127 $30.5633 - - 4,000 $6,878 $51.5700 $5,732 $42.9750 $4,585 $34.3800 - - 6,000 $7,909 $22.9200 $6,591 $19.1000 $5,273 $15.2800 - - 8,000 $8,368 $63.0450 $6,973 $52.5375 $5,578 $42.0300 - - 10,000 $9,629 $96.2850 $8,024 $80.2375 $6,419 $64.1900 1575
CC 05-19-2022
1575 of 1613
Inspection - New Construction Fee Schedule
Construction Type Construction Type Construction Type
IA, IB IIA, IIB, IIIA, IIIB, IV VA, VB
IBC
Class IBC Occupancy Type
Project Size
Threshold
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
Base Cost
@
Threshold
Size
Cost for
Each
Additional
100 sf *
R-3 Group Care 1,000 $7,100 $22.1963 $5,916 $18.4969 $4,733 $14.7975 - - 5,000 $7,988 $17.7300 $6,656 $14.7750 $5,325 $11.8200 - - 10,000 $8,874 $13.3200 $7,395 $11.1000 $5,916 $8.8800 - - 20,000 $10,206 $1.9800 $8,505 $1.6500 $6,804 $1.3200 - - 50,000 $10,800 $3.2400 $9,000 $2.7000 $7,200 $2.1600 - - 100,000 $12,420 $12.4200 $10,350 $10.3500 $8,280 $8.2800 R-4 Group Care 100 $4,437 $138.6675 $3,698 $115.5563 $2,958 $92.4450 - - 500 $4,992 $110.9400 $4,160 $92.4500 $3,328 $73.9600 - - 1,000 $5,547 $83.1900 $4,622 $69.3250 $3,698 $55.4600 - - 2,000 $6,379 $12.3300 $5,316 $10.2750 $4,252 $8.2200 - - 5,000 $6,749 $20.3400 $5,624 $16.9500 $4,499 $13.5600 - - 10,000 $7,766 $77.6550 $6,471 $64.7125 $5,177 $51.7700 R R Occupancy Tenant Improvements 80 $3,905 $152.5350 $3,254 $127.1125 $2,603 $101.6900 - - 400 $4,393 $122.0100 $3,661 $101.6750 $2,929 $81.3400 - - 800 $4,881 $91.5150 $4,068 $76.2625 $3,254 $61.0100 - - 1,600 $5,613 $13.5700 $4,678 $11.3083 $3,742 $9.0467 - - 4,000 $5,939 $22.3800 $4,949 $18.6500 $3,959 $14.9200 - - 8,000 $6,834 $85.4250 $5,695 $71.1875 $4,556 $56.9500 S-1 Storage—Moderate Hazard 600 $2,812 $38.1480 $2,343 $31.7900 $1,875 $25.4320 - - 3,000 $3,727 $41.4240 $3,106 $34.5200 $2,485 $27.6160 - - 6,000 $4,970 $18.5160 $4,142 $15.4300 $3,313 $12.3440 - - 12,000 $6,081 $5.4560 $5,068 $4.5467 $4,054 $3.6373 - - 30,000 $7,063 $9.1440 $5,886 $7.6200 $4,709 $6.0960 - - 60,000 $9,806 $16.3440 $8,172 $13.6200 $6,538 $10.8960 S-2 Storage—Low Hazard 10,000 $8,097 $6.5888 $6,748 $5.4906 $5,398 $4.3925 - - 50,000 $10,733 $7.1550 $8,944 $5.9625 $7,155 $4.7700 - - 100,000 $14,310 $3.2100 $11,925 $2.6750 $9,540 $2.1400 - - 200,000 $17,520 $0.9350 $14,600 $0.7792 $11,680 $0.6233 - - 500,000 $20,325 $1.5750 $16,938 $1.3125 $13,550 $1.0500 - - 1,000,000 $28,200 $2.8200 $23,500 $2.3500 $18,800 $1.8800 S S Occupancy Tenant Improvements 600 $3,326 $45.1275 $2,772 $37.6063 $2,218 $30.0850 - - 3,000 $4,410 $49.0050 $3,675 $40.8375 $2,940 $32.6700 - - 6,000 $5,880 $21.9150 $4,900 $18.2625 $3,920 $14.6100 - - 12,000 $7,195 $6.4550 $5,996 $5.3792 $4,796 $4.3033 - - 30,000 $8,357 $10.8150 $6,964 $9.0125 $5,571 $7.2100 - - 60,000 $11,601 $19.3350 $9,668 $16.1125 $7,734 $12.8900 U Accessory—Private Garage / 40 $1,695 $344.8425 $1,412 $287.3688 $1,130 $229.8950 - Agricultural Building 200 $2,246 $374.4000 $1,872 $312.0000 $1,498 $249.6000 - - 400 $2,995 $167.4900 $2,496 $139.5750 $1,997 $111.6600 - - 800 $3,665 $49.2700 $3,054 $41.0583 $2,443 $32.8467 - - 2,000 $4,256 $82.7700 $3,547 $68.9750 $2,838 $55.1800 - - 4,000 $5,912 $147.7950 $4,927 $123.1625 $3,941 $98.5300 - Deferred Submittal - All Except R-3 1,000 $3,578 $29.1150 $2,981 $24.2625 $2,385 $19.4100 - - 5,000 $4,742 $31.6050 $3,952 $26.3375 $3,162 $21.0700 - - 10,000 $6,323 $14.1450 $5,269 $11.7875 $4,215 $9.4300 - - 20,000 $7,737 $4.1600 $6,448 $3.4667 $5,158 $2.7733 - - 50,000 $8,985 $6.9900 $7,488 $5.8250 $5,990 $4.6600 - - 100,000 $12,480 $12.4800 $10,400 $10.4000 $8,320 $8.3200 - Deferred Submittal - R-3 1,000 $3,766 $81.7400 $3,138 $68.1167 $2,511 $54.4933 - - 2,500 $4,992 $110.9200 $4,160 $92.4333 $3,328 $73.9467 - - 4,000 $6,656 $74.4600 $5,547 $62.0500 $4,437 $49.6400 - - 6,000 $8,145 $65.6700 $6,788 $54.7250 $5,430 $43.7800 - - 8,000 $9,458 $183.9300 $7,882 $153.2750 $6,306 $122.6200 - - 10,000 $13,137 $131.3700 $10,948 $109.4750 $8,758 $87.5800 - Standard Comm. Foundation 500 $4,615 $28.8338 $3,846 $24.0281 $3,077 $19.2225 - w/o Podium 2,500 $5,192 $23.0700 $4,326 $19.2250 $3,461 $15.3800 - - 5,000 $5,768 $17.3250 $4,807 $14.4375 $3,846 $11.5500 - - 10,000 $6,635 $2.5700 $5,529 $2.1417 $4,423 $1.7133 - - 25,000 $7,020 $4.2300 $5,850 $3.5250 $4,680 $2.8200 - - 50,000 $8,078 $16.1550 $6,731 $13.4625 $5,385 $10.7700
SHELL BUILDINGS
- All Shell Buildings 500 $2,511 $40.8660 $2,092 $34.0550 $1,674 $27.2440 - - 2,500 $3,328 $44.3880 $2,773 $36.9900 $2,219 $29.5920 - - 5,000 $4,438 $19.8480 $3,698 $16.5400 $2,958 $13.2320 - - 10,000 $5,430 $5.8400 $4,525 $4.8667 $3,620 $3.8933 - - 25,000 $6,306 $9.8160 $5,255 $8.1800 $4,204 $6.5440 - - 50,000 $8,760 $17.5200 $7,300 $14.6000 $5,840 $11.6800 * Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. 1576
CC 05-19-2022
1576 of 1613
MECHANICAL, ELECTRICAL, & PLUMBING FEES
1577
CC 05-19-2022
1577 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 1 of 3
MECHANICAL, ELECTRICAL & PLUMBING PERMIT FEES
FEE TYPES
Actual
Unit Cost
$ 2.47
ADMINISTRATIVE AND MISC. FEES
Travel and Documentation Fees: $ 50.29 $ 48.00 $ (2.29) 95% MECHANICAL PERMIT FEES $ 49.30 $ 48.00 $ (1.30) 97%
Stand Alone Mechanical Plan Check (hourly rate) $ 147.91 $ 143.00 $ (4.91) 97% UNIT FEES: 0%
Install/Relocate forced air or gravity-type furnace or burner (including attached ducts and vents) up to and including 100,000 Btu/h (each) $ 147.91 $ 143.00 $ (4.91) 97% Install/Relocate forced air or gravity-type furnace or burner (including attached ducts and vents) over 100,000 Btu/h (each) $ 147.91 $ 143.00 $ (4.91) 97% Install/Relocate floor furnace, including vent (each) $ 73.96 $ 72.00 $ (1.96) 97% Install/Relocate suspended heater, recessed wall heater, or floor-mounted unit heater (each) $ 73.96 $ 72.00 $ (1.96) 97%
Install/Relocate suspended heater, recessed wall heater, or floor-mounted unit heater (each) $ 73.96 $ 72.00 $ (1.96) 97%
Install/Relocate/Replace appliance vent installed and not included in an appliance permit (each) $ 73.96 $ 72.00 $ (1.96) 97%
Install/Relocate/Replace appliance vent installed and not included in an appliance permit (each) $ 73.96 $ 72.00 $ (1.96) 97%
Repair/Alter/Add heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls (each) - Residential $ 73.96 $ 72.00 $ (1.96) 97% Repair/Alter/Add heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption, or evaporative cooling system, including installation of controls (each) - Commercial $ 147.91 $ 143.00 $ (4.91) 97% Install/Relocate boiler or compressor, up to and including 3HP, or absorption system up to and including 100,000 Btu/h (each) $ 147.91 $ 107.00 $ (40.91) 72% Install/Relocate boiler or compressor, over 3HP and up to and including 15 HP, or absorption system over 100,000 Btu/h and up to and including 500,000 Btu/h (each) $ 147.91 $ 132.00 $ (15.91) 89%
Install/Relocate boiler or compressor, over 15 HP and up to and including 30 HP, or absorption system over 500,000 Btu/h and up to and including 1,000,000 Btu/h (each) $ 184.89 $ 156.00 $ (28.89) 84%
Install/Relocate boiler or compressor, over 30 HP and up to and including 50 HP, or absorption system over 1,000,000 Btu/h and up to and including 1,750,000 Btu/h (each) $ 184.89 $ 179.00 $ (5.89) 97%
Install/Relocate boiler or compressor, over 50 HP, or absorption system over 1,750,000 Btu/h (each) $ 221.87 $ 203.00 $ (18.87) 91%
Air-handling unit, including attached ducts. (Note: this fee shall not apply to an airhandling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere) (each) - Residential $ 73.96 $ 72.00 $ (1.96) 97%
Air-handling unit, including attached ducts. (Note: this fee shall not apply to an airhandling unit that is a portion of a factory-assembled appliance, cooling unit, evaporative cooler, or absorption unit for which a permit is required elsewhere) (each) - Commercial $ 221.87 $ 143.00 $ (78.87) 64%
Air-handling unit over 10,000 CFM (each) $ 147.91 $ 143.00 $ (4.91) 97% Ventilation fan connected to a single duct (each) $ 73.96 $ 25.00 $ (48.96) 34% Ventilation system that is not a portion of any heating or air-conditioning system authorized by a permit (each) $ 110.93 $ (110.93) 0%
Hood installation that is served by mechanical exhaust, including the ducts for such hood (each) - Residential $ 73.96 $ 36.00 $ (37.96) 49% Hood installation that is served by mechanical exhaust, including the ducts for such hood (each) - Commercial $ 221.87 $ 143.00 $ (78.87) 64% Appliance or piece of equipment not classed in other appliance categories, or for which no other fee is listed (each) $ 110.93 $ 107.00 $ (3.93) 96% OTHER FEES: $ - $ - 0%
Other Mechanical Inspections (per hour) $ 147.91 $ 143.00 $ (4.91) 97%
UNIT COSTS
Cost
Recovery
%
FY 14-15
Average
Current Fee
Subsidy to
Public per
Unit
1578
CC 05-19-2022
1578 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 2 of 3
FEE TYPES
Actual
Unit Cost
$ 2.47
UNIT COSTS
Cost
Recovery
%
FY 14-15
Average
Current Fee
Subsidy to
Public per
Unit
PLUMBING/GAS PERMIT FEES $ 50.29 $ 48.00 $ (2.29) 95%
Stand Alone Plumbing Plan Check (hourly rate) $ 147.91 $ 143.00 $ (4.91) 97% UNIT FEES:
Plumbing fixture or trap or set of fixtures on one trap, including water, drainage piping, and backflow protection (each) $ 10.35 $ 10.00 $ (0.35) 97% Building or trailer park sewer (each - Residential) $ 36.98 $ 25.00 $ (11.98) 68% Building or trailer park sewer (each - Commercial) $ 73.96 $ 25.00 $ (48.96) 34% Rainwater system inside building (per drain) $ 10.35 $ (10.35) 0% Cesspool (each) $ 147.91 $ 143.00 $ (4.91) 97%
Private sewage disposal system (each) $ 147.91 $ 143.00 $ (4.91) 97% Water Heater and/or vent (each) - Residential $ 36.98 $ 29.00 $ (7.98) 78% Water Heater and/or vent (each) - Commercial $ 110.93 $ 29.00 $ (81.93) 26% Industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps (each) $ 110.93 $ 36.00 $ (74.93) 32% Install/Alter/Repair water piping and/or water treating equipment (each) $ 50.29 $ 48.00 $ (2.29) 95% Repair/Alter drainage or vent piping (each fixture) $ 50.29 $ 48.00 $ (2.29) 95% Lawn sprinkler system on any one meter, including backflow protection devices therefore (each) $ 73.96 $ 72.00 $ (1.96) 97%
Backflow devices not included in other fee services, e.g., building/trailer park sewer (each) $ 73.96 $ 72.00 $ (1.96) 97%
Atmospheric-type vacuum breakers not included in other fee services, e.g., building/trailer park sewer (1-5 units) $ 73.96 $ 72.00 $ (1.96) 97% Atmospheric-type vacuum breakers not included in other fee services, e.g., building/trailer park sewer (each unit over 5 units) $ 73.96 $ 72.00 $ (1.96) 97% For each gas piping system of 1-4 outlets $ 73.96 $ 72.00 $ (1.96) 97% For each gas piping system of 1-4 outlets $ 73.96 $ 72.00 $ (1.96) 97% For each gas piping system of 5 or more outlets (each) $ 73.96 $ 72.00 $ (1.96) 97% Water Service (Residential) $ 36.98 $ 25.00 $ (11.98) 68% Re-pipe per fixture - Residential $ 14.79 $ 14.00 $ (0.79) 95% Re-pipe per fixture - Commercial $ 9.86 $ 9.00 $ (0.86) 91% OTHER FEES: $ - $ - 0%
Other Plumbing and Gas Inspections (per hour) $ 147.91 $ 143.00 $ (4.91) 97% 1579
CC 05-19-2022
1579 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 3 of 3
FEE TYPES
Actual
Unit Cost
$ 2.47
UNIT COSTS
Cost
Recovery
%
FY 14-15
Average
Current Fee
Subsidy to
Public per
Unit
ELECTRICAL PERMIT FEES $ 50.29 $ 48.00 $ (2.29) 95%
Stand Alone Electrical Plan Check (hourly rate) $ 147.91 $ 143.00 $ (4.91) 97% UNIT FEES:
Receptacle, Switch, and Lighting Outlets
Receptacle, switch, lighting, or other outlets at which current is used or controlled, except services, feeders, and meters
First 20 $ 50.29 $ 48.00 $ (2.29) 95%
Each Additional $ 4.44 $ 5.00 $ 0.56 113%
Lighting Fixtures $ - $ - 0%
Lighting Fixtures, sockets, or other lamp-holding devices $ - $ - 0% First 20 $ 73.96 $ 72.00 $ (1.96) 97%
Additional Fixtures, each $ 5.92 $ 6.00 $ 0.08 101%
Pole or platform-mounted lighting fixtures (each) $ 16.27 $ 16.00 $ (0.27) 98% Theatrical-type lighting fixtures or assemblies (each) $ 14.79 $ 14.00 $ (0.79) 95% Residential Appliances $ - 0%
Fixed residential appliances or receptacle outlets for same, including wallmounted electric ovens; counter mounted cooking tops; electric ranges; selfcontained room console or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor-operated appliances (each) not exceeding one horsepower (HP) in rating (each) $ 25.14 $ 25.00 $ (0.14) 99%
Nonresidential Appliances $ - $ - 0%
Residential appliances and self-contained factory-wired, nonresidential appliances not exceeding one horsepower (HP), kilowatt (kW), or kilovoltampere (kVA) in rating, including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment (each) $ 50.29 $ 48.00 $ (2.29) 95% Power Apparatus
Motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment, and other apparatus. Rating in horsepower (HP), kilowatts (kW), or kilovolt-amperes (kVA), or kilovolt-amperes-reactive (kVAR) $ 147.91 $ 143.00 $ (4.91) 97% 1 Unit $ 36.98 $ 36.00 $ (0.98) 97%
2 through 5 units, each additional $ 36.98 $ 36.00 $ (0.98) 97% 6 and over, each additional $ 36.98 $ 36.00 $ (0.98) 97% Busways $ - $ - 0%
Trolley and plug-in-type busways - each 100 feet or fraction thereof $ 73.96 $ 25.00 $ (48.96) 34% Signs, Outline Lighting, and Marquees $ - $ - 0%
Signs, Outline Lighting, or Marquees supplied from one branch circuit (each) $ 50.29 $ 48.00 $ (2.29) 95% Additional branch circuits within the same sign, outline lighting system, or marquee (each) $ 25.14 $ 25.00 $ (0.14) 99%
Services (Temporary Power) $ - $ - 0%
Services of 600 volts or less, up to 200 amperes in rating (each) $ 50.29 $ 48.00 $ (2.29) 95% Services of 600 volts or less, 201 to 1000 amperes in rating (each) $ 73.96 $ 72.00 $ (1.96) 97% Services over 600 volts or over 1000 amperes in rating (each) $ 87.27 $ 84.00 $ (3.27) 96% Fore services of 600 volts or less and not over 200 amperes in rating, each (Residential) $ 50.29 $ 48.00 $ (2.29) 95%
For services of 600 volts or less and over 200 amperes to 1,000 amperes in rating, each (Residential) $ 73.96 $ 72.00 $ (1.96) 97% For services over 600 volts over 1,000 amperes in rating, each (Residential) $ 147.91 $ 84.00 $ (63.91) 57% Miscellaneous Apparatus, Conduits, and Conductors $ - $ - 0% Electrical apparatus, conduits, and conductors for which a permit is required, but for which no fee is herein set forth $ 147.91 $ 143.00 $ (4.91) 97% OTHER FEES:
Other Electrical Inspections (per hour) $ 147.91 $ 143.00 $ (4.91) 97% 1580
CC 05-19-2022
1580 of 1613
MISCELLANEOUS BUILDING FEES
1581
CC 05-19-2022
1581 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 1 of 5
MISCELLANEOUS ITEMS PERMIT FEES
UNIT COSTS
Work Item Unit
Total Actual
Cost
Average
Current Fee
Subsidy to
Public per
Unit
Standard Hourly Rate $ 147.91 $ 143.00 $ (4.91) 97%
Accessibility Hardship Exemption 1 hour $ 147.91 $ 187.00 $ 39.09 126% Acoustical Review $ -
Single Family Home/Duplex—New each $ 369.78 $ 645.00 $ 275.22 174% Single Family Home/Duplex—Addition/Alteration each $ 221.87 $ 716.00 $ 494.13 323% Multi-Family/Commercial each $ 369.78 $ 286.00 $ (83.78) 77% Additions (R3 Occ) - Plan Check Fees $ -
Over the counter-(not hillside-has conventional framingMinimum 2 hours up to 250 sf $ 295.82 $ 286.00 $ (9.82) 97% Plan Check Fees (not hillside). up to 250 sf $ 295.82 $ 1,091.00 $ 795.18 369% Plan Check Fees (not hillside). 251-499 sf $ 591.64 $ 1,626.00 $ 1,034.36 275% each additional hour 1 hour $ 147.91 $ 143.00 $ (4.91) 97% Additions (R3 Occ) - Inspection Fees $ -
Inspection Fees (Not Hillside) up to 250 sf $ 739.55 $ 1,057.00 $ 317.45 143% Inspection Fees (Not Hillside) 251-499 sf $ 887.46 $ 1,323.00 $ 435.54 149% Address Assignment per hour $ 147.91 $ 359.00 $ 211.09 243% Administrative/Clerical Fee - 1/2 hour flat rate 1/2 hour $ 73.96 $ 45.00 $ (28.96) 61% Alternate Materials and Methods of Construction 1 hour $ 147.91 $ 187.00 $ 39.09 126% Antenna—Telecom Facility $ -
Radio each $ 369.78 $ 431.00 $ 61.22 117%
Cellular/Mobile Phone, free-standing each $ 813.51 $ 1,145.00 $ 331.49 141% Cellular/Mobile Phone, attached to building each $ 665.60 $ 1,145.00 $ 479.40 172% Arbor/Trellis each $ 295.82 $ - $ (295.82) 0%
Awning/Canopy (supported by building) each $ 295.82 $ 359.00 $ 63.18 121% Balcony Addition each $ 665.60 $ 788.00 $ 122.40 118%
Carport each $ 517.69 $ 645.00 $ 127.31 125%
Certifications
Special Inspector Qualifications (initial review) each $ 295.82 $ 286.00 $ (9.82) 97% Special Inspector Qualifications (renewal / update) each $ 147.91 $ 143.00 $ (4.91) 97% Special Inspector Certification Application each $ 5,028.97 $ 4,867.00 $ (161.97) 97% Materials Testing Lab Certification each $ 3,106.13 $ 3,006.00 $ (100.13) 97% Chimney each $ 443.73 $ 574.00 $ 130.27 129%
Chimney Repair each $ 295.82 $ 574.00 $ 278.18 194%
Close Existing Openings
Interior wall each $ 295.82 $ 503.00 $ 207.18 170%
Exterior wall each $ 443.73 $ 503.00 $ 59.27 113%
Commercial Coach (per unit) each unit $ 665.60 $ 859.00 $ 193.40 129% Covered Porch each $ 517.69 $ 1,003.00 $ 485.31 194%
Deck (wood) each $ 517.69 $ 503.00 $ (14.69) 97%
Deck Railing each $ 295.82 $ 503.00 $ 207.18 170%
Deferred Submittal (2 hour minimum) per hour $ 295.82 $ 143.00 $ (152.82) 48% Cost
Recovery %
1582
CC 05-19-2022
1582 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 2 of 5
UNIT COSTS
Work Item Unit
Total Actual
Cost
Average
Current Fee
Subsidy to
Public per
Unit
Cost
Recovery %
Demolition
Commercial (up to 3,000 sf) each $ 369.78 $ 574.00 $ 204.22 155% Commercial (each add'l 3,000 sf) each 3,000 sf $ 147.91 $ 286.00 $ 138.09 193% Residential (up to 3,000 sf) each $ 295.82 $ 574.00 $ 278.18 194% Residential (each add'l 3,000 sf) each 3,000 sf $ 147.91 $ 143.00 $ (4.91) 97% Demolition
Swimming Pool Residential each $ 295.82 $ 329.00 $ 33.18 111% Swimming Pool Commercial (up to 3,000 sf) each $ 443.73 $ 574.00 $ 130.27 129% Swimming Pool Commercial (each add'l 3,000 sf) each 3,000 sf $ 147.91 $ 286.00 $ 138.09 193% Disabled Access Compliance Inspection per hour $ 147.91 $ 143.00 $ (4.91) 97% Door
New door (non structural) each $ 221.87 $ 286.00 $ 64.13 129% New door (structural shear wall/masonry) each $ 295.82 $ 431.00 $ 135.18 146% Duplicate/Replacement Job Card each $ 73.96 $ 72.00 $ (1.96) 97% Electric Vehicle Charging Station each $ - $ 109.00 $ 109.00 0% Extensions
Plan Check Applications (within 180 days of Submittal) 1 hour $ 147.91 $ 187.00 $ 39.09 126% Permits (within 180 days of Issuance) $ - $ - 0%
Start construction, w/o plans 30 min $ 73.96 $ 72.00 $ (1.96) 97% Resume or complete construction, w/o plans 30 min $ 73.96 $ 72.00 $ (1.96) 97% Start construction, w/ plans 1 hour $ 147.91 $ 187.00 $ 39.09 126% Resume or complete construction, w/ plans 2 hours $ 295.82 $ 231.00 $ (64.82) 78% Fence
Non-masonry, over 6 feet in height up to 100 l.f. $ 295.82 $ 431.00 $ 135.18 146% Non-masonry, each additional 100 lf each 100 l.f. $ 73.96 $ 72.00 $ (1.96) 97% Masonry, over 6 feet in height up to 100 l.f. $ 517.69 $ 716.00 $ 198.31 138% Masonry, each additional 100 lf each 100 l.f. $ 295.82 $ 286.00 $ (9.82) 97% Fireplace
Masonry each $ 517.69 $ 716.00 $ 198.31 138%
Pre-Fabricated/Metal each $ 295.82 $ 503.00 $ 207.18 170% Flag pole (over 20 feet in height) each $ 295.82 $ 394.00 $ 98.18 133% Foundation Repair each $ 665.60 $859.00 $ 193.40 129%
Garage / Agricultural Buildings
Wood frame up to 1,000 sf each $ 961.42 $129.00 $ (832.42) 13% Masonry up to 1,000 sf each $ 1,257.24 $1,290.00 $ 32.76 103% Inspections
Standard Inspection Hourly Rate per hour $ 147.91 $143.00 $ (4.91) 97% Outside of normal business hours, 0-2 hours (minimum
charge) up to 2 hrs $ 295.82 $430.00 $ 134.18 145%
Each additional hour or portion thereof 1 hour $ 147.91 $ 214.00 $ 66.09 145% Reinspection fee—per hour 1 hour $ 147.91 $ 143.00 $ (4.91) 97% Progress Inspection per hour $ 147.91 $ 143.00 $ (4.91) 97% Partial Inspection per hour $ 147.91 $ 143.00 $ (4.91) 97% Courtesy Inspection - 2 hour minimum 2 hours $ 295.82 $ 286.00 $ (9.82) 97% 1583
CC 05-19-2022
1583 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 3 of 5
UNIT COSTS
Work Item Unit
Total Actual
Cost
Average
Current Fee
Subsidy to
Public per
Unit
Cost
Recovery %
Inspections for which no fee is specifically indicated—per hour (minimum charge = 1/2 hour) 1 hour $ 147.91 $ 143.00 $ (4.91) 97% Cancelled inspection w/out advance notice 1 hour $ 147.91 $ 143.00 $ (4.91) 97% Life Safety Report each $ 887.46 $ 859.00 $ (28.46) 97% Lighting pole each $ 369.78 $ 431.00 $ 61.22 117%
each add'l pole each $ 147.91 $ 431.00 $ 283.09 291%
Modular Structures each $ 665.60 $ 859.00 $ 193.40 129% Modification of Technical Code 1 hour $ 147.91 $ 187.00 $ 39.09 126% Partition—Commercial, Interior (up to 30 l.f.) up to 30 l.f. $ 443.73 $ 503.00 $ 59.27 113% Additional partition each 30 l.f. $ 147.91 $ 107.00 $ (40.91) 72% Partition—Residential, Interior (up to 30 l.f.) up to 30 l.f. $ 295.82 $ 503.00 $ 207.18 170% Additional partition each 30 l.f. $ 73.96 $ 107.00 $ 33.04 145% Patio Cover/ Sun Room
Wood frame up to 300 sf $ 369.78 $ 716.00 $ 346.22 194% Metal frame up to 300 sf $ 369.78 $ 716.00 $ 346.22 194% Other frame up to 300 sf $ 517.69 $ 716.00 $ 198.31 138% Additional patio each 300 sf $ 221.87 $ 574.00 $ 352.13 259% Enclosed, wood frame up to 300 sf $ 517.69 $ 859.00 $ 341.31 166% Enclosed, metal frame up to 300 sf $ 517.69 $ 859.00 $ 341.31 166% Enclosed, other frame up to 300 sf $ 517.69 $ 859.00 $ 341.31 166% Additional enclosed patio each 300 sf $ 295.82 $ 716.00 $ 420.18 242% Photovoltaic System
Residential each $ 258.84 $ 236.00 $ (22.84) 91%
Multi-Family Res/Commercial, up to 8 kilowatts up to 8 kW $ 369.78 $ 572.00 $ 202.22 155% Multi-Family Res/Commercial, each additional 1 kilowatt each 1 kW $ 36.98 $ 11.00 $ (25.98) 30% Pile Foundation
Cast in Place Concrete (first 10 piles) up to 10 $ 665.60 $ 1,003.00 $ 337.40 151% Additional Piles (increments of 10) each 10 $ 443.73 $ 859.00 $ 415.27 194% Driven (steel, pre-stressed concrete) up to 10 $ 665.60 $ 1,003.00 $ 337.40 151% Additional Piles (increments of 10) each 10 $ 443.73 $ 859.00 $ 415.27 194% Product Review per hour $ 147.91 $ 143.00 $ (4.91) 97%
Plan Review
Standard Plan Review Hourly Rate per hour $ 147.91 $ 143.00 $ (4.91) 97% CALGreen Plan Review (minimum 2 hr charge in addition to Plan Check Fees) per hour $ 295.82 $ 143.00 $ (152.82) 48% Expedite Plan Review (1.5 times plan review) $ - $ - 0% Outside of normal business hours, (minimum 2 hr charge in addition to Plan Check Fees) per hour $ 295.82 $ 214.00 $ (81.82) 72% Remodel—Residential
Kitchen up to 300 sf $ 591.64 $ 645.00 $ 53.36 109%
Bath up to 300 sf $ 591.64 $ 645.00 $ 53.36 109%
Other Remodel up to 300 sf $ 443.73 $ 431.00 $ (12.73) 97% Additional remodel each 300 sf $ 221.87 $ 72.00 $ (149.87) 32% Other Remodel 1000 sf $ 1,405.15 $ 4,320.00 $ 2,914.85 307% Additional remodel each 300 sf $ 221.87 $ 284.00 $ 62.13 128% 1584
CC 05-19-2022
1584 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 4 of 5
UNIT COSTS
Work Item Unit
Total Actual
Cost
Average
Current Fee
Subsidy to
Public per
Unit
Cost
Recovery %
Other Remodel 2500 sf + $ 1,848.89 $ 5,739.00 $ 3,890.11 310% Additional remodel each 300 sf $ 221.87 $ 205.00 $ (16.87) 92% Re-roof
Residential (max $400 per building) each 100 sf $ 15.68 $ 17.00 $ 1.32 108% Multi-Family Dwelling (max $400 per building) each 100 sf $ 15.68 $ 17.00 $ 1.32 108% Commercial (first 5,000 sf) each $ 369.78 $ 394.00 $ 24.22 107% Commercial (each add'l 2,500 sf) each 2,500 sf $ 147.91 $ 179.00 $ 31.09 121% Retaining Wall (concrete or masonry)
Standard (up to 50 lf) up to 50 l.f. $ 665.60 $ 859.00 $ 193.40 129% Additional retaining wall each 50 l.f. $ 443.73 $ 716.00 $ 272.27 161% Special Design, 3-10' high (up to 50 lf) up to 50 l.f. $ 961.42 $ 1,003.00 $ 41.58 104% Additional retaining wall each 50 l.f. $ 591.64 $ 859.00 $ 267.36 145% Special Design, over 10' high (up to 50 lf) up to 50 l.f. $ 1,109.33 $ 1,074.00 $ (35.33) 97% Additional retaining wall each 50 l.f. $ 739.55 $ 930.00 $ 190.45 126% Gravity/Crib Wall, 0-10' high (up to 50 lf) up to 50 l.f. $ 961.42 $ 1,074.00 $ 112.58 112% Additional Gravity/Crib Wall each 50 l.f. $ 591.64 $ 930.00 $ 338.36 157% Gravity/Crib Wall, over 10' high (up to 50 lf) up to 50 l.f. $ 1,109.33 $ 1,074.00 $ (35.33) 97% Additional Gravity/Crib Wall each 50 l.f. $ 739.55 $ 930.00 $ 190.45 126% Revisions
Commercial New each $ 665.60 $ 859.00 $ 193.40 129%
Tenant Improvement each $ 665.60 $ 859.00 $ 193.40 129% SFDWL each $ 369.78 $ 859.00 $ 489.22 232%
Addition each $ 369.78 $ 716.00 $ 346.22 194%
Remodel each $ 295.82 $ 716.00 $ 420.18 242%
Sauna—steam each $ 517.69 $ 788.00 $ 270.31 152%
Siding
Stone and Brick Veneer (interior or exterior) up to 400 sf $ 369.78 $ 645.00 $ 275.22 174% All Other up to 400 sf $ 295.82 $ 431.00 $ 135.18 146%
Additional siding each 400 sf $ 73.96 $ 215.00 $ 141.04 291% Signs
Directional each $ 295.82 $ 286.00 $ (9.82) 97%
Each additional Directional Sign each $ 147.91 $ 143.00 $ (4.91) 97% Ground/Roof/Projecting Signs each $ 295.82 $ 359.00 $ 63.18 121% Master Plan Sign Check each $ 295.82 $ 359.00 $ 63.18 121% Rework of any existing Ground Sign each $ 295.82 $ 359.00 $ 63.18 121% Other Sign each $ 295.82 $ 359.00 $ 63.18 121%
Reinspection Fee each $ 73.96 $ 72.00 $ (1.96) 97%
Wall/Awning Sign, Non-Electric each $ 221.87 $ 286.00 $ 64.13 129% Wall, Electric each $ 295.82 $ 286.00 $ (9.82) 97%
Shed over 120 square feet each $ 665.60 $ 430.00 $ (235.60) 65% Skylight
50 sf or less (cumulative area) each $ 369.78 $ 431.00 $ 61.22 117% Greater than 50 sf or structural each $ 517.69 $ 788.00 $ 270.31 152% 1585
CC 05-19-2022
1585 of 1613
User Fee (Cost of Services) Study
FY 15-16 Budget
City of Cupertino, CA
Building Division
Matrix Consulting Group Page 5 of 5
UNIT COSTS
Work Item Unit
Total Actual
Cost
Average
Current Fee
Subsidy to
Public per
Unit
Cost
Recovery %
Solar Water Heating each $ 147.91 $ 109.00 $ (38.91) 74% Stairs—First Flight first flight $ 295.82 $ 359.00 $ 63.18 121% Each additional flight per flight $ 147.91 $ 215.00 $ 67.09 145% Storage Racks
0-8' high (up to 100 lf) first 100 lf $ 369.78 $ 359.00 $ (10.78) 97% each additional 100 lf each 100 lf $ 73.96 $ 72.00 $ (1.96) 97% over 8' high (up to 100 lf) first 100 lf $ 369.78 $ 394.00 $ 24.22 107% each additional 100 lf each 100 lf $ 73.96 $ 107.00 $ 33.04 145% Stucco Applications up to 400 sf $ 295.82 $ 503.00 $ 207.18 170% Additional Stucco Application each 400 sf $ 73.96 $ 36.00 $ (37.96) 49% Supplemental Inspection Fee—If a project requires significantly more inspections than average, the Building Official may charge additional inspection fees $ - $ - 0%
First 1/2 hour minimum first 30 min $ 73.96 $ 72.00 $ (1.96) 97% Each Additional hour per hour $ 147.91 $ 143.00 $ (4.91) 97% Overtime Plan Check Fee per hour $ 221.87 $ 214.00 $ (7.87) 96% Supplemental Plan Check Fee (after 2nd review)
First 1/2 hour minimum first 30 min $ 73.96 $ 72.00 $ (1.96) 97% Each Additional hour per hour $ 147.91 $ 143.00 $ (4.91) 97% Swimming Pool/Spa
Vinyl-lined (up to 800 sf) each $ 665.60 $ 1,003.00 $ 337.40 151% Fiberglass each $ 665.60 $ 716.00 $ 50.40 108%
Gunite (up to 800 sf) each $ 961.42 $ 1,574.00 $ 612.58 164% Additional pool (over 800 sf) each 100 sf $ 221.87 $ 215.00 $ (6.87) 97% Commercial pool (up to 800 sf) each $ 1,627.02 $ 2,004.00 $ 376.98 123% Commercial pool (over 800 sf) each $ 443.73 $ 251.00 $ (192.73) 57% Spa or Hot Tub (Pre-fabricated) each $ 295.82 $ 359.00 $ 63.18 121% Temporary Occupancy Permit - flat rate 2 hours $ 295.82 $ 286.00 $ (9.82) 97% Temporary Structures each $ 443.73 $ 430.00 $ (13.73) 97% Tenant Improvement Preparation each $ 295.82 $ 417.00 $ 121.18 141% Window or Sliding Glass Door
Replacement (first 8 windows) first 8 $ 221.87 $ 431.00 $ 209.13 194% Replacement (each add'l 8 windows) each 8 $ 73.96 $ 143.00 $ 69.04 193% New Window (non structural) each $ 184.89 $ 503.00 $ 318.11 272% New window (structural shear wall/masonry) each $ 258.84 $ 859.00 $ 600.16 332% Bay Window (structural) each $ 258.84 $ 859.00 $ 600.16 332% 1586
CC 05-19-2022
1586 of 1613
COMPARATIVE SURVEY
1587
CC 05-19-2022
1587 of 1613
CITY OF CUPERTINO, CALIFORNIA
BUILDING COMPARATIVE FEE SURVEY
Matrix Consulting Group Page 1
Single Family Home - New
Occupancy Type: R3
Square Footage: 3,100 sqft.
Valuation: $371,165
BP Fee PC Fee Total
Cupertino - Current - Square Footage $ 3,060 $ 3,088 $ 6,147 Cupertino @ 100% Cost Recovery $ 4,171 $ 3,685 $ 7,856 78% Santa Clara - Valuation $ 2,530 $ 1,897 $ 4,427
Mountain View - Valuation $ 3,899 $ 2,535 $ 6,434
Milpitas - Square Footage $ 5,461 $ 3,580 $ 9,041
Sunnyvale - Valuation $ 3,622 $ 2,536 $ 6,158
Palo Alto - Valuation $ 4,348 $ 3,478 $ 7,826
Average $ 3,972 $ 2,805 $ 6,777
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
$9,000
$10,000
Cupertino -
Current - Square
Footage
Cupertino @
100% Cost
Recovery
Santa Clara -
Valuation
Mountain View -
Valuation
Milpitas - Square
Footage
Sunnyvale -
Valuation
Palo Alto -
Valuation
Permit Fees
Single Family Home - New
Permit and Plan Check Fees
Plan Check
Permit
Average
1588
CC 05-19-2022
1588 of 1613
CITY OF CUPERTINO, CALIFORNIA
BUILDING COMPARATIVE FEE SURVEY
Matrix Consulting Group Page 2
Retail Shell Building
Occupancy Type: M
Square Footage: 20,000 sqft.
Valuation: $1,841,000
BP Fee PC Fee Total
Cupertino - Current - Square Footage $ 9,908 $ 5,484 $ 15,392 Cupertino @ 100% Cost Recovery $ 6,286 $ 7,980 $ 14,266 108% Santa Clara - Valuation $ 8,691 $ 6,518 $ 15,209
Mountain View - Valuation $ 13,445 $ 8,739 $ 22,185
Milpitas - Square Footage $ 5,195 $ 13,199 $ 18,394
Sunnyvale - Valuation $ 11,770 $ 8,239 $ 20,009
Palo Alto - Valuation $ 15,154 $ 12,123 $ 27,277
Average $ 10,851 $ 9,764 $ 20,615
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
Cupertino -
Current -
Square
Footage
Cupertino @
100% Cost
Recovery
Santa Clara -
Valuation
Mountain View
- Valuation
Milpitas -
Square
Footage
Sunnyvale -
Valuation
Palo Alto -
Valuation
Permit Fee
Retail Shell Building
Permit and Plan Check Fees
Plan
Check
Permit
Average
1589
CC 05-19-2022
1589 of 1613
CITY OF CUPERTINO, CALIFORNIA
BUILDING COMPARATIVE FEE SURVEY
Matrix Consulting Group Page 3
Office - Tenant Improvement
Occupancy Type: B
Square Footage: 3,000 sqft.
Valuation: $388,476
BP Fee PC Fee Total
Cupertino - Current - Square Footage $ 2,613 $ 2,377 $ 4,990 Cupertino @ 100% Cost Recovery $ 3,844 $ 3,254 $ 7,098 70% Santa Clara - Valuation $ 2,627 $ 1,970 $ 4,596
Mountain View - Valuation $ 4,050 $ 2,633 $ 6,683
Milpitas - Square Footage $ 2,037 $ 1,611 $ 3,648
Sunnyvale - Valuation $ 3,759 $ 2,632 $ 6,391
Palo Alto - Valuation $ 4,515 $ 3,612 $ 8,128
Average $ 3,398 $ 2,491 $ 5,889
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
$9,000
Cupertino -
Current -
Square
Footage
Cupertino @
100% Cost
Recovery
Santa Clara -
Valuation
Mountain View
- Valuation
Milpitas -
Square
Footage
Sunnyvale -
Valuation
Palo Alto -
Valuation
Permit Fees
Office - Tenant Improvement
Permit and Plan Check Fees
Plan Check
Permit
Average
1590
CC 05-19-2022
1590 of 1613
CITY OF CUPERTINO, CALIFORNIA
BUILDING COMPARATIVE FEE SURVEY
Matrix Consulting Group Page 4
Restaurant - New
Occupancy Type: A-2
Square Footage: 10,000 sqft.
Valuation: $2,713,600
BP Fee PC Fee Total
Cupertino - Current - Square Footage $ 11,109 $ 7,192 $ 18,301 Cupertino @ 100% Cost Recovery $ 5,012 $ 7,114 $ 12,125 151% Santa Clara - Valuation $ 11,876 $ 8,907 $ 20,783
Mountain View - Valuation $ 18,375 $ 11,944 $ 30,319
Milpitas - Square Footage $ 6,878 $ 7,779 $ 14,657
Sunnyvale - Valuation $ 15,670 $ 10,969 $ 26,640
Palo Alto - Valuation $ 20,817 $ 16,653 $ 37,470
Average $ 14,723 $ 11,251 $ 25,974
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
Cupertino -
Current -
Square
Footage
Cupertino @
100% Cost
Recovery
Santa Clara -
Valuation
Mountain View
- Valuation
Milpitas -
Square
Footage
Sunnyvale -
Valuation
Palo Alto -
Valuation
Permit Fees
Restaurant - New
Permit and Plan Check Fees
Plan Check
Permit
Average
1591
CC 05-19-2022
1591 of 1613
CITY OF CUPERTINO, CALIFORNIA
BUILDING COMPARATIVE FEE SURVEY
Matrix Consulting Group Page 5
Warehouse - New
Occupancy Type: S-1
Square Footage: 20,000 sqft.
Valuation: $1,234,600
BP Fee PC Fee Total
Cupertino - Current - Square Footage $ 11,898 $ 8,262 $ 20,160 Cupertino @ 100% Cost Recovery $ 4,345 $ 5,962 $ 10,307 196% Santa Clara - Valuation $ 6,477 $ 4,858 $ 11,335
Mountain View - Valuation $ 10,019 $ 6,512 $ 16,531
Milpitas - Square Footage $ 5,195 $ 13,199 $ 18,394
Sunnyvale - Valuation $ 9,059 $ 6,341 $ 15,401
Palo Alto - Valuation $ 11,218 $ 8,974 $ 20,193
Average $ 8,394 $ 7,977 $ 16,371
$-
$5,000
$10,000
$15,000
$20,000
$25,000
Cupertino -
Current -
Square
Footage
Cupertino @
100% Cost
Recovery
Santa Clara -
Valuation
Mountain View
- Valuation
Milpitas -
Square
Footage
Sunnyvale -
Valuation
Palo Alto -
Valuation
Permit Fees
Warehouse - New
Permit and Plan Check Fees
Plan Check
Permit
Average
1592
CC 05-19-2022
1592 of 1613
Planning Comparative Survey
Matrix Consulting Group Page 1 of 5
Current Full Cost
Up to one Acre
$7,300
One Acre+
$12,200
Tentative: Tentative:
Up to one Acre
$4,300
One Acre+
$5,200
Vesting:
Up to one Acre
$6,000
One Acre+
$6,900
Use Permit / Development Permit - Major $15,974 $21,343 $7,800 Use Permit / Development Permit - Minor $7,461 $12,809 $2,500 Amendment to Use Permit / Development Permit - Major $7,988 $10,746 N / A Amendment to Use Permit / Development Permit - Minor $3,730 $5,884 $961 Architectural and Site Approval - Major $7,461 $13,189 $5,800 $3,712 deposit Architectural and Site Approval - Minor $3,609 $8,862 $5,800 $2,896 Architectural and Site Approval - Minor Duplex / Residential $3,609 $5,768 $610 $1,448 Environmental Impact Report (Plus State & County Filing Fees) $27,948 $27,948 $16,000 Cost + 15% N / A N / A Negative Declaration - Major (Plus State & County Filing Fees) $4,299 $4,299 $12,500 Negative Declaration - Minor (Plus State & County Filing Fees) $2,149 $2,149 $9,000 Categorical Exemption (Plus County Filing Fee) $250 $230 N / A N / A N / A $324 Fence Exception $716 $2,891 N / A $526 N / A N / A $ 1,193 Single Family Detached Single Family: Residential
$1,300 $375 $2,436
All Others Non Residential: Commercial
$4,300 $3,000 deposit $5,138
Conditional Use Permit - Administrative $3,730 $4,676 N / A $3,858 $3,000 deposit N / A N / A Tree Removal Permit $0 $0
First Tree $180 $1,362 $279
Each Additional Tree $92 $160
Heritage Tree Designation $107 $2,630 $526 $161
Temporary Use Permit $1,439 $2,824 N / A $368 N / A $161 $190 Temporary Sign Permit $211 $319 $ 50 N / A N / A $0 $61 Individual:
$300
Master:
$453
Planning
Commission
$7,834
City Council
$8,239
Zoning Verification Letter $190 $338 $300 N / A $40 N / A N / A Public Convenience & Necessity Letter (Alcohol Beverage License) $190 $169 N / A $1,333 N / A N / A N / A Single Family: 500 Ft:
$330 $309
All Other: 1,000 Ft:
$5,600 $972
2,000 Ft:
$1,989
Renoticing:
$143
$161 N / A
Noticing $0 $368 N / A N / A N / A
Appeals $182 $360 50% of original fee $100
N / A
$5,000 deposit
N / A N / A N / A
N / A
N / A
N / A N / A N / A
$440
$788
$770 $3,309
$5,905 Deposit
$1,077
$3,799
Category Santa Clara Mountain View Milpitas Sunnyvale Palo Alto N / A
$1,947
$2,889
Cupertino
N / A
Sign Program $721 $2,582
Tentative Map (Five or More Parcels)
Parcel Map (0-4 Parcels)
Variance $2,813 $5,167
$7,461 $12,732
$15,974 $21,179
$579
$2,457
$2,973 $20,000 deposit
$10,000 deposit
N / A N / A
N / A
1593
CC 05-19-2022
1593 of 1613
Planning Comparative Survey - Charts
Matrix Consulting Group Page 2 of 5
$0
$5,000
$10,000
$15,000
$20,000
$25,000
Cupertino
- Current
Cupertino
- Full Cost
Santa
Clara -
Average
Mountain
View -
Average
Milpitas -
Average
Palo Alto -
Average
Tentative Map (Five or More Parcels)
Average
$0
$2,000
$4,000
$6,000
$8,000
$10,000
$12,000
$14,000
Cupertino
- Current
Cupertino
- Full Cost
Santa
Clara -
Average
Mountain
View -
Average
Milpitas -
Average
Palo Alto -
Average
Parcel Map (0-4 Parcels)
Average
$0
$2,000
$4,000
$6,000
$8,000
$10,000
$12,000
$14,000
Cupertino -
Current
Cupertino - Full
Cost
Santa Clara -
Average
Palo Alto -
Average
Use Permit
Average
$0
$2,000
$4,000
$6,000
$8,000
$10,000
Cupertino -
Current
Cupertino - Full
Cost
Santa Clara -
Average
Palo Alto -
Average
Architectural and Site Approval
Average
1594
CC 05-19-2022
1594 of 1613
Planning Comparative Survey - Charts
Matrix Consulting Group Page 3 of 5
$0
$5,000
$10,000
$15,000
$20,000
$25,000
Environmental Review
Average
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
Cupertino -
Current
Cupertino - Full
Cost
Mountain View -
Average
Palo Alto -
Average
Fence Exception
Average
$0 $1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
Variance
Average
$0
$1,000
$2,000
$3,000
$4,000
$5,000
Cupertino -
Current
Cupertino - Full
Cost
Mountain View -
Average
Milpitas -
Average
Conditional Use Permit - Administrative
Average
1595
CC 05-19-2022
1595 of 1613
Planning Comparative Survey - Charts
Matrix Consulting Group Page 4 of 5
$0
$500
$1,000
$1,500
$2,000
$2,500
Cupertino -
Current
Cupertino - Full
Cost
Mountain View -
Average
Sunnyvale -
Average
Tree Permits
Average
$0
$50
$100
$150
$200
$250
$300
$350
Cupertino -
Current
Cupertino -
Full Cost
Santa Clara -
Average
Sunnyvale -
Average
Palo Alto -
Average
Temporary Sign Permit
Average
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
Cupertino -
Current
Cupertino -
Full Cost
Mountain
View -
Average
Sunnyvale -
Average
Palo Alto -
Average
Temporary Use Permit
Average
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
Cupertino -
Current
Cupertino -
Full Cost
Santa Clara -
Average
Mountain
View -
Average
Sunnyvale -
Average
Sign Program
Average
1596
CC 05-19-2022
1596 of 1613
Planning Comparative Survey - Charts
Matrix Consulting Group Page 5 of 5
$0
$50
$100
$150
$200
$250
$300
$350
$400
Cupertino -
Current
Cupertino -
Full Cost
Santa Clara -
Average
Milpitas -
Average
Average
Zoning Verification Letter
Average
$0
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
Cupertino -
Current
Cupertino - Full
Cost
Santa Clara -
Average
Sunnyvale -
Average
Noticing
Average
1597
CC 05-19-2022
1597 of 1613
Public Works Comparative Survey
Matrix Consulting Group Page 1 of 3
Current Fee Full Cost
Block Party $ - $ 533 $ 25 $ -
Certificates of Compliance $ 1,540 $ 2,461 $ 1,840 $ 575 Actual Cost $ 700 Certificates of Correction $ 169 $ 703 $ 550 N / A $ 3,122 N / A $ 1,157
per lot
$ 49
$ 3,850
per lot
$ 83
5-10 lots
$ 4,949
11-50 lots
$ 5,774
50+ lots
$ 8,660
Plus Each lot (Tract Map
Only) $ - $ - $ 114 N / A $ 289 $ 60
Summary $ 603 $ 1,882 $ 1,930 $ 1,596
Full $ 603 $ 2,997 $ 3,012
Minor Utility Permit
$ 263 $ 272 $ 385 Construction less
than 50 feet Processing Fee
Debris Box /
Temporary Storage
Container
Minor $ 263 $ 394 $ 220 $301 $ 242 $ 118
Major $ 525 $ 678 $ 385 50+ ft in length All Others Non-Residential $301 + $181 / 100 ft $320 min or 8% of
cost $ 2,034
Field Marking -
Sanitary Sewer or
Storm Drain
Encroachment
Residential
0-50 ft $ 1,112
$ 161 Temporary
50+ ft $ 874
$161 + $1.32 / foot
Review of building permit only $ 655 $ 741 $ 455
$0-$250,000 $0 to $10,000 $0-$50,000
14% of Cost $4,030 7.5% of Construction
Cost
$250,000-$550,000 $10,001-$50,000 $50,001-$500,000
$4,030 + 35% of cost $3,750 + 4.5% of
Construction Cost
$50,001-$1,000,0000 $500,001+
$550,001+ $18,030 + 4% of cost $24,000 + 3.5% of
Construction Cost
$55,000 + 7% of Cost $1,000,001+
$56,030 + 1% of cost
Lot Line Adjustment $ 3,012 $ 2,477 $ 1,856 $ 6,948 $ 2,350 FEE CATEGORY Cupertino Campbell Sunnyvale Santa Clara Mountain View Parcel Map / Tract Map (Map Checking Fees):
Parcel Map (1-4 lots) $ 4,254 $ 4,973 $ 3,093 $ 17,855 $ 2,908 Vacation of Street of Right-of-Way
N / A N / A
Tract Map (>4 lots) $ 8,831 $ 8,165 $ 4,681 $ 19,972 $ 4,907 Commercial $4,498 or 6% of
cost $ 6,266
N / A
Encroachment Permits
Other Categories N / A N / A
Plan Check & Inspection - Review of Public / Private Improvement Plans:
Residential $2,788 or 5% of
cost $ 3,349
$35,000 + 8% of Cost N / A
1598
CC 05-19-2022
1598 of 1613
Public Works Comparative Survey - Charts
Matrix Consulting Group Page 2 of 3
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
Cupertino -
Current Fee
Cupertino -
Full Cost
Campbell Sunnyvale Mountain
View
Fee Amount
Certificates of Compliance
Average
$-
$500
$1,000
$1,500
$2,000
$2,500
$3,000
$3,500
Cupertino -
Current Fee
Cupertino - Full
Cost
Campbell Santa Clara
Certificate of Correction
Average
$-
$5,000
$10,000
$15,000
$20,000
Cupertino
- Current
Fee
Cupertino
- Full Cost
Campbell Sunnyvale Santa
Clara
Mountain
View
Parcel Map (0-4 lots)
Average
$-
$5,000
$10,000
$15,000
$20,000
$25,000
Cupertino
- Current
Fee
Cupertino
- Full Cost
Campbell Sunnyvale Santa
Clara
Mountain
View
Tract Map (4+ lots)
Average
1599
CC 05-19-2022
1599 of 1613
Public Works Comparative Survey - Charts
Matrix Consulting Group Page 3 of 3
$-
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
Cupertino
- Current
Fee
Cupertino
- Full Cost
Campbell Sunnyvale Santa
Clara
Mountain
View
Lot Line Adjustment
Average
$-
$500
$1,000
$1,500
$2,000
$2,500
Cuper.no -
Current Fee
Cuper.no - Full
Cost
Sunnyvale Mountain View
Vacation
Average
1600
CC 05-19-2022
1600 of 1613
ATTACHMENT L
RESOLUTION NO: 22‐049
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CUPERTINO
AMENDING PREVIOUS FEE SCHEDULES
WHEREAS, the State of California requires fees charged for service rendered not to exceed the cost of delivering said services; and
WHEREAS, a public hearing has been held to review user fees; and WHEREAS, In 2016 the City conducted a Cost of Service (User Fee) Study and conducts annual updates pursuant to economic factors discussed in the staff report for this item to ensure that the fees charged do not exceed the cost of delivering the services.
NOW, THEREFORE, BE IT RESOLVED that:
1. User fees are amended per attached Schedules A, B, C, D, and E to this Resolution, effective July 18, 2022.
PASSED AND ADOPTED at a special meeting of the City Council of the City of Cupertino this 19th day of May, 2022 by the following vote:
Vote Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
SIGNED:
________
Darcy Paul, Mayor
City of Cupertino
________________________
Date
ATTEST:
________________________
Kirsten Squarcia, City Clerk
________________________
Date
1601
CC 05-19-2022
1601 of 1613
CITY OF CUPERTINO
Agenda Item
22-10872 Agenda Date: 5/19/2022
Agenda #: 18.
Subject: Consideration of Municipal Code amendments to the Cupertino Municipal Code, Title 2 to add Chapter 2.96 and codify the Economic Development Committee (Continued from May 17, 2022)
1. Conduct the first reading of Ordinance No. 22-2240; “An Ordinance of the City Council of the City of Cupertino Adding Chapter 2.96 of Title 2 (Administration and Personnel) to Codify the Economic Development Committee"
2. Find that the proposed actions are exempt from CEQA
Presenter: Tina Kapoor, Economic Development Manager
CITY OF CUPERTINO Page 1 of 1 Printed on 5/18/2022
powered by Legistar™1602
CC 05-19-2022
1602 of 1613
CITY COUNCIL STAFF REPORT
Meeting: May 19, 2022
Subject
Consideration of Municipal Code amendments to the Cupertino Municipal Code, Title 2 to add Chapter 2.96 and codify the Economic Development Committee.
Recommended Action
1. Conduct the first reading of Ordinance No. ____ “An Ordinance of the City Council of the City of Cupertino Adding Chapter 2.96 of Title 2 (Administration and Personnel) to Codify the Economic Development Committee".
2. Find that the proposed actions are exempt from CEQA.
Discussion
The Economic Development Committee (EDC) has met informally for well over two decades to discuss items of importance pertinent to local businesses and to provide feedback to staff on business‐related City initiatives or projects.
As part of the FY 2021‐2022 City Work Program discussion, the City Council requested that the EDC be codified in the Municipal Code through an ordinance.
The proposed ordinance for the EDC has been drafted based on input from Council and staff research on economic development committees in other local cities.
Powers and Functions:
The powers and functions of the Committee shall be to serve in an advisory capacity to the City Council and to provide expertise and guidance on policy related to economic development. The Committee shall also actively promote Cupertino as a location of choice for current and prospective businesses.
To fulfill their mission, the Committee may involve itself in the following activities:
1. Make recommendations to City Council on a broad range of strategic matters broadly applicable to the City’s economic development goals; 1603
CC 05-19-2022
1603 of 1613
2. Serve as an ambassador to shed a positive light on the City by sharing economic development resources and information to prospective businesses and stakeholders, thus positioning the City as a location of choice; and
3. Encourage public/private partnerships to further the City’s economic development goals by identifying potential resources.
Membership:
As proposed, the membership of this new Committee would consist of five members, including elected officials, industry sector representatives, and key partners:
1. City Councilmember
2. City Councilmember
3. Technology Sector Representative
4. Retail/Small Business Representative
5. Hospitality/Tourism Sector Representative
Term:
Committee members would serve an initial term of four years, with a possibility to serve for an additional four years. Committee members would not serve for more than two consecutive terms.
Economic Development Committees/Commissions in Other Cities Staff conducted research on economic development committees in other cities in Santa Clara County and the local area. Out of the 18 other cities surveyed, five have active economic development commissions or committees that are subcommittees of Council.
Palo Alto is currently in the process of forming one. Details on the composition and purpose of the commissions or committees in these cities are below:
City Committee Composition Purpose
Mountain
View
Downtown
Committee
11 members
• Four (4) property owners
or downtown business
representatives
• Two (2) community-atlarge members who are
residents of Mountain
View
• Four (4) business-at-large
members with
representatives from:
- One (1) Downtown
Encourage economic
development specific to
the downtown area.
1604
CC 05-19-2022
1604 of 1613
Business Association
- One (1) Chamber of
Commerce
- Two (2) businesses
not in the Downtown.
San Jose Community and
Economic
Development
Committee
Five (5) Councilmembers Manage the growth and
change of the City of San
José in order to encourage
a strong economy; ensure
a diverse range of arts,
cultural, and
entertainment offerings;
and create and preserve
housing and healthy
neighborhoods. This
committee was previously
named the Driving a
Strong Economy
Committee.
Santa Clara Economic
Development,
Communication,
and Marketing
Committee
Four (4) Councilmembers The Economic
Development Committee
and the Marketing
Committee were
consolidated in 2019. This
Committee focuses
proactive economic
development and
effective communication,
as well as reviews the
City’s marketing and
branding strategies.
Fremont Economic
Development
Advisory
Commission
Nine (9) commissioners
• Five (5) representatives
from: Business, Resident;
Real Estate; Ohlone
Community College.
• Three (3) representatives
from Commercial /
Industrial sector.
• One (1) representative
from the Chamber of
Commerce.
Promotes and facilitates
economic development in
the City of Fremont and
enhances and supports
current businesses in the
City.
Milpitas Economic
Development
Seven (7) commissioners
• One (1) Councilmember
Advise the City Council
on business issues,
1605
CC 05-19-2022
1605 of 1613
and Trade
Commission
• Six (6) representatives
from:
- Chamber of
Commerce
- Real Estate
- Resident
- Milpitas Unified
School
District/Education
- Business
- Technology and
Trade
cultivate international
trade relationships, and
make recommendations
on the design,
development, and
implementation of
economic development in
the City of Milpitas.
Palo Alto In the process of hiring an ED Manager and in the planning stages to begin economic development meetings that are cohosted with the chamber, business owners, building owners, and the community.
Next Steps
City Council to review the proposed ordinance, provide feedback to staff, and conduct the first and second readings when appropriate. If approved, the Committee will convene once the members are appointed.
Sustainability Impact
No sustainability impact.
Fiscal Impact
While the EDC has not always met consistently in the past, this Ordinance will set a regular quarterly meeting schedule. With more consistency and structured functions, the EDC may require more staff time than in past years. However, this consistency and structure will be beneficial and worth the additional staff time costs. _____________________________________
Prepared by: Tina Kapoor, Economic Development Manager
Reviewed by: Chris Jensen, City Attorney
Dianne Thompson, Assistant City Manager
Katy Nomura, Deputy City Manager
Approved for Submission by: Jim Throop, City Manager
Attachments:
A – Draft Ordinance Adding Chapter 2.96 Economic Development Committee 1606
CC 05-19-2022
1606 of 1613
Ordinance No. __________ ATTACHMENT A
1 ORDINANCE NO. __________________
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CUPERTINO AMENDING CITY CODE TITLE 2
CHAPTER 2.96: ECONOMIC DEVELOPMENT COMMITTEE
The City Council of the City of Cupertino finds that:
1. The purpose of this Ordinance is to establish the Economic Development Committee (EDC).
2. The EDC has met informally for well over two decades to discuss items of importance pertinent to local businesses and to provide feedback to staff on business‐related City initiatives or projects. As part of the FY 2021‐2022 City Work Program discussion, the City Council requested that the EDC be codified in the Municipal Code through an ordinance.
NOW, THEREFORE, THE CITY COUNCIL OF THE OF CITY OF CUPERTINO DOES ORDAIN AS FOLLOWS:
SECTION 1. Adoption.
The Cupertino Municipal Code is hereby amended to add Chapter 2.96 as set forth in Attachment A.
SECTION 2: Severability and Continuity.
The City Council declares that each section, sub-section, paragraph, sub-paragraph, sentence, clause and phrase of this ordinance is severable and independent of every other section, sub-section, paragraph, sub-paragraph, sentence, clause and phrase of this ordinance. If any section, sub-section, paragraph, sub-paragraph, sentence, clause or phrase of this ordinance is held invalid, or its application to any person or circumstance, be determined by a court of competent jurisdiction to be unlawful, unenforceable or otherwise void, the City Council declares that it would have adopted the remaining provisions of this ordinance irrespective of such portion, and further declares its express intent that the remaining portions of this ordinance should remain in effect after the invalid portion has been eliminated. To the extent the provisions of this Ordinance are substantially the same as previous provisions of the Cupertino Municipal Code, these provisions shall be construed as continuations of those provisions and not as an amendment to or readoption of the earlier provisions. 1607
CC 05-19-2022
1607 of 1613
Ordinance No. __________ ATTACHMENT A
2 SECTION 3: California Environmental Quality Act.
This Ordinance is not a project under the requirements of the California Environmental Quality Act, together with related State CEQA Guidelines (collectively, “CEQA”) because it has no potential for resulting in physical change in the environment. In the event that this Ordinance is found to be a project under CEQA, it is subject to the CEQA exemption contained in CEQA Guidelines section 15061(b)(3) because it can be seen with certainty to have no possibility that the action approved may have a significant effect on the environment. CEQA applies only to actions which have the potential for causing a significant effect on the environment. Where it can be seen with certainty that there is no possibility that the activity in question may have a significant effect on the environment, the activity is not subject to CEQA. In this circumstance, the amendments to the Municipal Code would have no or only a de minimis effect on the environment. The foregoing determination is made by the City Council in its independent judgment.
SECTION 4: Effective Date.
This Ordinance shall take effect thirty days after adoption as provided by Government Code Section 36937.
SECTION 5: Publication.
The City Clerk shall give notice of adoption of this Ordinance as required by law.
Pursuant to Government Code Section 36933, a summary of this Ordinance may be prepared by the City Clerk and published in lieu of publication of the entire text. The City Clerk shall post in the office of the City Clerk a certified copy of the full text of the Ordinance listing the names of the City Council members voting for and against the ordinance.
INTRODUCED at a regular meeting of the Cupertino City Council on May 19, 2022, and ENACTED at a regular meeting of the Cupertino City Council on ______, 2022 by the following vote:
Members of the City Council
AYES:
NOES:
ABSENT:
ABSTAIN:
1608
CC 05-19-2022
1608 of 1613
Ordinance No. __________ ATTACHMENT A
3 SIGNED:
______________________
Darcy Paul, Mayor
City of Cupertino
________________________
Date
ATTEST:
_______________________
Kirsten Squarcia, City Clerk
________________________
Date
APPROVED AS TO FORM:
_______________________
Christopher D. Jensen, City Attorney
________________________
Date
1609
CC 05-19-2022
1609 of 1613
Ordinance No. __________ ATTACHMENT A
Chapter 2.96: Economic Development Committee
The sections of the Cupertino Municipal Code set forth below are amended or adopted as follows:
2.96.010 Established–Composition.
A. The Economic Development Committee of the City of Cupertino is established.
The Economic Development Committee (hereinafter referred to in this Chapter as "Committee") shall consist of five (5) members as follows:
1. City Councilmember
2. City Councilmember
3. Technology Sector Business Representative
4. Retail/Small Business Representative
5. Hospitality/Tourism Sector Representative
B. The Committee shall be comprised of two Council members. Three members shall be from key industry sectors – Technology, Retail, and Hospitality.
Committee Members shall be Cupertino residents or own a business or be currently employed at a business/organization located within the City of Cupertino.
C. None of these representatives shall be officials or employees of the City, nor cohabit with, as defined by law, nor be related by blood or marriage to any other member of the Committee, to the City Manager, or to any staff person(s) who may be assigned to assist this Committee.
D. Members of the Committee shall be appointed by the City Council.
2.96.020 Terms of Office. of Office.
A. Committee Members serve at the pleasure of the City Council. The term of office for Committee Members shall be four (4) years unless appointed by the City Council for a shorter term. All terms shall end on January 30 of the year the term is due to expire. No Committee Members shall serve more than two consecutive terms, except that a Committee Member may serve more than two consecutive terms if he or she has been appointed to the Committee to fill an unexpired term of less than two years.
1610
CC 05-19-2022
1610 of 1613
Ordinance No. __________ ATTACHMENT A
B. The appointment, reappointment and rules governing incumbent members of the Committee are governed by the Resolution of the Cupertino City Council which governs advisory bodies.
2.96.030 Members–Vacancy or Removal.
Any Committee Member may be removed by a majority vote of the City Council. If a vacancy occurs, other than by expiration of a term, it shall be filled by the City Council's appointment for the unexpired portion of the term.
2.96.040 Chairperson.
The Committee shall elect its chairperson and vice chairperson from among its members [and shall appoint a secretary]. Terms of the chair and vice chair shall be for one year.
2.96.050 Meetings–Quorum.
A. The Committee shall hold regular meetings on a quarterly basis on and at the discretion of the Committee shall hold other meetings as may be necessary or expedient.
B. A majority of the Committee shall constitute a quorum for the purpose of transacting the business of the Committee.
C. A special meeting may be called at any time by the chairperson or by a majority of the Committee Members upon notice being given in advance in accordance with the provisions of the Ralph M. Brown Act or successor statute in effect at the time.
2.96.060 Majority Vote Required.
A majority vote of Committee Members present is required to approve a recommendation on any matter that is presented to the Committee that requires a vote.
2.96.070 Records.
The Committee shall keep an accurate record of its proceedings and transactions and shall render such reports to the City Council as may be required. These records shall be filed with the City Clerk.
1611
CC 05-19-2022
1611 of 1613
Ordinance No. __________ ATTACHMENT A
2.96.080 Powers and Functions.
A. The powers and functions of the Committee shall be to serve in an advisory capacity to the City Council and to provide expertise and guidance on policy related to economic development. The Committee shall also actively promote Cupertino as a location of choice for current and prospective businesses.
B. To fulfill their mission, the Committee may involve itself in the following activities:
1. Make recommendations to the City Council on a broad range of strategic matters broadly applicable to the City’s economic development goals;
2. Serve as an ambassador to shed a positive light on the City by sharing economic development resources and information to prospective businesses and stakeholders, thus positioning the City as a location of choice; and
3. Encourage public/private partnerships to further the City’s economic development goals by identifying potential resources.
2.96.090 City Staff Assistance.
The Committee shall have available to it such assistance of City staff as may be required to perform its functions, the staff assignments and administrative procedures to be under the general direction and supervision of the Economic Development Manager.
2.96.100 Compensation–Expenses.
Committee Members shall serve without compensation. Committee Members may be reimbursed for necessary expenses reasonably incurred by them while acting in their official capacity subject to the approval of the City Manager.
2.96.110 Procedural Rules.
The Committee may adopt from time to time such rules of procedure as it may deem necessary to properly exercise its powers and duties. Such rules shall be kept on file with the Chairperson of the Committee, the Mayor, and the City Clerk, and a copy thereof shall be furnished to any person on request.
1612
CC 05-19-2022
1612 of 1613
Ordinance No. __________ ATTACHMENT A
2.96.120 Effect.
Nothing in this Chapter shall be construed as restricting or curtailing any powers of the City Council or City officers.
1613
CC 05-19-2022
1613 of 1613