Cities Index.
Agenda packet

Cypress City Council
June 27, 2022

Document
Agenda packet
Meeting
June 27, 2022
Body
Cypress City Council
Pages
10
Original file
55.4 MB
Text extracted from the city's file for reading and search. Open the original on public.destinyhosted.com. That file is the official record.

aThe capacity to provide the right staff at the right time.We have a deep bench of in-house construction managers, inspectors, project and documents control specialists, and engineers who bring experience in all aspects of public works infrastructure. Our team is competent, responsive, and conforms to California Building Standards Code/Title 24, City standards, codes and ordinances, federal grant requirements, Caltrans Local Assistance Procedures Manual (LAPM), Greenbook, APWA standards, AWWA standards and, where appropriate, LEED, DSA, and OSHPD standards.
aSpecialized experts bolster the team.We are continuing our partnership with HL Construction Management (HLCM) to assist with cost estimating and Geo-Advantec, Inc. (GAI) for material testing. HLCM has tremendous experience with cost estimating services that will be of great value to the City in establishing construction budgets that are accurate and take into account the ever-changing landscape of construction costs. GAI provides outstanding geotechnical engineering, material testing, and inspection services for all phases of projects.

Ardurra has worked extensively with both of these exceptional firms.This long-standing alliance enables a streamlined approach and smooth coordination.

We look forward to teaming with the City and assisting with delivery of your CIP projects. Please feel free to contact me at [email protected] or (714) 458-0703, should you have any questions or require additional information.

Respectfully submitted,
Ardurra Group, Inc.

Dino P. D’Emilia, PE, F.ASCE, QSD
Project and Construction Management Group Leader
Cell: 714.458.0703
[email protected]
[ 3 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
ARCHITECT – ENGINEER QUALIFICATIONS
PART I – CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION

1. TITLE AND LOCATION (CITY AND STATE)
On-Call Construction Management/Engineering Support/Testing and Inspection Services(City of Cypress, CA)

2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 04/15/2022 NA
B. ARCHITECT-ENGINEER POINT OF CONTACT

4. NAME AND TITLE
Dino D’Emilia, PE, F.ASCE, QSD, Project and Construction Management Group Leader

5. NAME OF FIRM
Ardurra Group, Inc.

6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
714.458.0703 949.258.5053 [email protected]
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.) (CHECK)

9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
PRIME

J-V PARTNER

SUBCONTRACTOR
a. ü Ardurra Group, Inc. 1960 E. Grand Ave., Suite 300
El Segundo, CA 90245
Construction Management, Inspection,
Engineering ü CHECK IF BRANCH OFFICE
b. ü Ardurra Group, Inc. 3737 Birch St., Suite 250
Newport Beach, CA 92660
Construction Management, Inspection,
Engineering ü CHECK IF BRANCH OFFICE
c. ü Ardurra Group, Inc. 43410 Business Park Drive
Temecula, CA 92590
Construction Management, Inspection,
Engineering ü CHECK IF BRANCH OFFICE
d. ü Geo-Advantec, Inc. 457 W. Allen Ave., Suite 113
San Dimas, CA 91773
Material Testing, Inspection

CHECK IF BRANCH OFFICE
e. ü HL Construction Management 678 N Lemon Hill Trl
Orange, CA 92869
Cost Estimating

CHECK IF BRANCH OFFICE
f.

CHECK IF BRANCH OFFICE
g.

CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM ü (Attached)
[ 4 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022

ON-CALL CM/ENGINEERING SUPPORT/TESTING & INSPECTION

ORGANIZATION CHART

CITY OF CYPRESS

PROJECT MANAGER
Nick Mangkalakiri, PE

PRINCIPAL-IN-CHARGE

PROJECT DIRECTOR
Dino D’Emilia, PE, F.ASCE, QSD*
Steve Badum, PE*

QA/QC & TECHNICAL REVIEW
Amy Czajkowski, PE, CCM, QSD/P*
* Denotes that resume is included.

We can provide additional resumes
upon the City's request.

CONSTRUCTION MANAGERS
John Wolitarsky, CCM*
Oscar Gonzalez, PE*
Earl Schwartz, PE, QSD*
Omar Alameddine, EIT*
Mark Lewis, PE, TE*
Gafur Oyewo*
Arash Rostamian, PE, QSP, CPII*
Joe Stoakley, PE, QSD*
Bradley Waldrop, PE*
Scott Adamson, PE, QSD/P
Bob Barrett, PE, QSD/P
Lucas Findlay, PE, QSD/P

INSPECTORS
Brian Briones*
Keith Forbes, QSP*
Eric Nunez*
Gafur Oyewo*
Arash Rostamian, PE, QSP, CPII*
Joe Stoakley, PE, QSD*
Chip Vanderbeek, QSP*
Dustin Bender
Manuel Briones
Doug Davidson
Anthony Dazzo
John Dela Cruz, QSP
Eric Egurrola
Rob Fitzgerald
Anthony Guzman, QSP
Jay Jordan
Joe McMahon
Matt Reagan, QSP
Dennis Rodriguez
Don Wren, Jr.

ENGINEERING SUPPORT

PROJECT ENGINEERS
Anissa Voyiatzes, PE, QSD, ENV SP*
Lisette Bice, PE, QSD, ENV SP*
Jose Hernandez, PE, QSD/P*
Mark Lewis, PE, TE*
Joe Buckner, PE, PLS, QSD*
Miguel Hurtado, PE*
Andrea Mosqueda, PE*
Fong Tse, PE*
Eli Farah, PE
Anthony Amado, EIT
CADD
Jose Hernandez, PE, QSD/P*
GIS
Leah Russell
SURVEY
Joe Buckner, PE, PLS, QSD*
Kevin Cole, PLS
William Kull, PLS
Nick Richard, PE, QSD/P

PROJECT/DOCUMENTS CONTROL
Dustin Blackwell*
Adam Banihamed*
Dee Yeh*
Anthony Amado, EIT
Karen Brown-Castro
Mahina Payo

CONSTRUCTABILITY REVIEW/

VALUE ENGINEERING
John Wolitarsky, CCM*
Dino D’Emilia, PE, F.ASCE, QSD*
Earl Schwartz, PE, QSD*
Bradley Waldrop, PE*

SUBCONSULTANTS

COST ESTIMATING
Jay Helekar*

MATERIAL TESTING
Ronald Hanson, CEG, PG*
Dominique McGee*
Ivan Canales* LABOR COMPLIANCE
Victoria Booker, MBA*
Nancy Cambra
[ 5 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Dino D’Emilia, PE, F.ASCE, QSD Principal-in-Charge, Constructability Review/Value Engineering
a. TOTAL b. WITH CURRENT FIRM
31 12

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1996/PE/CA #C55453

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Dino D’Emilia brings extensive experience in project leadership, CM and civil engineering. He has completed nearly $1B in public works projects in Southern California. He is known as a project and construction manager who directly engages in both the intricacies of projects as well as overall quality, timely completion and cost-effectiveness. He brings expert-level knowledge of the Caltrans LAPM and relevant federal regulations and documentation.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal-in-charge for the new $11.5-million LEED certified replacement to the existing Transit Center, which will consist of a 2,900-SF building housing an operator lounge, private restrooms, public restrooms, and offices, as well as a kiss-and-ride parking lot and passenger drop-off area, and bus bays.Traffic signals, striping and construction of an upper-level parking lot will also be included. Phase two improvements will involve road widening including an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Services
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm QA/QC director for CM and inspection for a $3.6M multi-year contract with the City of Lake Forest to provide services for general municipal engineering, review of land use development applications, plan check for proposed developments, public works encroachment permit inspections, capital improvement project design, construction management and inspection, and water quality program management. Projects included five developments totaling over 3,800 housing units; design of the Los Alisos Blvd. resurfacing project; and annual sidewalk survey. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carson Street Master Plan Implementation
(Carson, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal-in-charge overseeing Ardurra’s construction management services for this $19M project. Improvements included drought-tolerant landscaping for parkways and medians; benches, bike racks and pedestrian-area lighting; public art; and entry monuments. Other additions included a traffic signal, reconfigured turn lanes, driveways rebuilt for ADA compliance, and median LED lights. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Program Management
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal-in-charge for $4M project management services contract.To date Ardurra has managed projects valued at more than $50M and have included 11th Place stairway and bluff repair, water quality improvements, stormwater total maximum daily load compliance, the Leeway Sailing and Aquatic Center expansion and renovation, beach restroom replacements, the new Seaside Way pedestrian bridge, new beachfront pedestrian and bicycle path, Belmont Pier feasibility study and interim improvements, Cherry Beach Playground, beach basketball courts at Junipero, Drake Soccer Field, Alamitos Beach Concession, among others. Also provides scheduling training and peer reviews for City staff. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fountain Valley Recreation Center Exterior Improvements (Fountain Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal-in-Charge for this $1M exterior renovation of the City’s 40-year-old recreation center. [ 6 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Amy Czajkowski, PE, CCM,
QSD/P QA/QC & Technical Review
a. TOTAL b. WITH CURRENT FIRM
29 19

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Temecula, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1999/PE/Civil Engineering/CA # C59082; CMCI Certified Construction Manager (A1762); California Stormwater Quality Association (CASQA) Qualified SWPPP Developer (QSD) Certification #24758

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) In her 29 years of serving water districts, municipalities, and purveyors, Amy Czajkowski has gained recognition for system planning, design engineering, and construction management of public water and wastewater infrastructure projects. Her engineering design experience includes pump and lift stations, conveyance systems, reservoir storage, and treatment facilities. An additional specialty of hers is stormwater management, which includes design services, assisting with permitting compliance, and performing inspection for effectiveness of BMP systems during construction. She has conducted master plans for water and sewer services, assessed impact fees, and developed CIPs to ensure adequate service.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Engineering Services for the Program/Project Management of Capital Improvement Plan (Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Program manager responsible for delivering engineering services for the program and project management of Long Beach Water Dept.'s CIP that ranges from new well water supply projects to sewer pipeline and lateral replacements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Near Term Water Supply & CIP, Elsinore Valley Municipal Water District, CA (Lake Elsinore, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Program manager for more than 40 CIP construction management and design projects ranging in construction value from $300,000 to $10 million. The CIP execution rate was over 90%, and all projects were completed on time and with an overall 2% change order rate. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED CIP Management (Construction Management and Design)
(Oceanside, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2016 2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm CIP manager responsible for the preparation of 15+ in-house designs, RFP preparation, managing consultant contracts, preparation of staff reports and other Council documents, as well as other functions to complete projects listed on the City's FY 15/16 CIP. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Mesa Garrison Emergency Sewer Repair Design-Build
(Oceanside, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager/project manager for the emergency repair of the collapsed 24-inch gravity sewer, which carries 15% of the City’s raw sewage. Developed an emergency method to stop the spill, stabilize the sewer, and subsequently repair this critical piece of infrastructure.

Project involved the reconstruction and/or replacement of 2,000 LF of sewer. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Project Management Support Services
(Coachella, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Program management support for Coachella Valley Water District that involved leading projects, managing, and prioritizing projects within the CIP program in order to improve the CVWD’s execution rate for the fiscal year. Responsible for ensuring all grant compliance and monitoring functions are completed for CVWD from the following programs: Clean Water State Revolving Fund, Drinking Water State Revolving Fund, California Green Project Reserve funded projects, Bureau of Reclamation projects, and the Department of Water Resources. [ 7 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Steve Badum, PE Project Director
a. TOTAL b. WITH CURRENT FIRM
42 6

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MPA/Public Administration; BS/Civil Engineering 1983/PE/Civil/CA #C36106

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Steve Badum brings more than 40 years of municipal management and engineering experience. His projects have included public works administration/management; engineering planning and design; water and sewer maintenance and operations; construction administration, inspection/resident engineer; land development design, plan check, subdivision and environmental processing; and consultant procurement and management. Steve retired in 2015 as Newport Beach's Assistant City Manager working with all City departments to improve and streamline City services. Significant accomplishments included management of the $140M Civic Center and Park project including a 16-acre park/wetlands/dog park; 17,000-SF library expansion; 100,000 SF of City Hall office building with one stop permitting center and a 450-space parking structure.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On -Call City Engineering Services
(Cypress, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Providing city engineering services including development services review, capital project support, employee training/mentoring, and civil engineering assistance.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Services, Opportunity Studies Area (OSA) Projects(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Management contact for this $3.58M project involving a multi-year contract with the City to provide services for general municipal engineering, review of land use development applications, plan check for proposed developments, public works encroachment permit inspections, capital improvement project design, construction management and inspection, and water quality program management. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lincoln Avenue Widening (between East Street and State
College Boulevard) (Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm QA/QC for engineering design services for the widening of Lincoln Avenue, pavement reconstruction, median island construction, curb and gutter construction, sidewalk construction, parkway construction, driveway construction, and curb ramp upgrades. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call City Engineering Services
(Signal Hill, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Currently under a multi-year contract reporting to the Public Works Director and providing city engineering services including CIP management, development services review, assessment district program management, preliminary engineering, capital project planning, budgeting and scheduling, permit and grant administration and general engineering support services. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Signal Hill Dog Park
(Signal Hill, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project management for the City’s Dog Park just south of the I-405 Freeway between Atlantic and Orange Avenues. Improvements include new artificial turf, landscaping, a parking lot and sidewalks.The park was enhanced with play mulch, crushed-granite walkways, seating, lighting, fencing, and drinking fountains.
[ 8 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE John Wolitarsky, CCM Construction Manager, Constructability Review/Value Engineering
a. TOTAL b. WITH CURRENT FIRM
36 6

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Business Administration Certified Construction Manager, CMAA #10457

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) John Wolitarsky has delivered critical public facility, recreation, aquatics, roadway, water and utility improvement projects throughout Southern California. He has managed high-profile arterial roadway improvements, renewal and replacement of domestic water and sewer lines and reservoirs, and public facility improvements including recreation complexes, fire stations, fountains, parkland projects, and aquatic centers.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cypress Police Department Seismic Retrofit, Emergency
Operations Center, and Modernization Project (Cypress, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $3.2M seismic upgrade and complete modernization to the interior of the existing Police Department.This 20,000 SF building with a partial basement includes new electrical, HVAC, office space, conference rooms, restrooms/locker rooms, evidence room, an outdoor patio, as well as seismic retrofitting of the building. Required substantial coordination with the Department to relocate personnel to temporary trailers during construction.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fountain Valley Recreation Center Exterior Improvements (Fountain Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $1M exterior renovation of the City’s 40-year-old recreation center. Managed replacement of the building’s storefront windows, doors and roof. Oversaw construction of a new entry area and the repainting of the entire building exterior.The center remained open for classes and community activities throughout construction. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Lead construction manager for the new $11.5-million LEED certified replacement to the existing Transit Center, which will consist of a 2,900-SF building housing an operator lounge, private restrooms, public restrooms, and offices, as well as a kiss-and-ride parking lot and passenger drop-off area, and bus bays.Traffic signals, striping and construction of an upper-level parking lot will also be included. Phase two improvements will involve road widening including an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 15th Street Bike Boulevard of Parks
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $1M, 2.5-mile safer east-west bikeway connection between neighborhoods throughout Long Beach.

Improvements included new bicycle/pedestrian facilities, way-finding signage, crosswalk enhancements, construction of intersection traffic circles, reconstruction of curb ramps, construction of bulbouts and installation of a flashing warning system at one of the busiest intersections. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carson Street Master Plan Implementation
(Carson, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager for a high-profile $22M revitalization of a 1.75-mile section of Carson Street.The project narrowed several intersections along this corridor to reduce traffic speeds and encourage walking, which required intersection reconstruction, utility and traffic signal relocations and modifications, wider sidewalks, public art, bicycle parking, pavement rehabilitation, new seating, landscaping and streetlights. [ 9 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Oscar Gonzalez, PE Construction Manager
a. TOTAL b. WITH CURRENT FIRM
35 <1

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MS/Environmental Engineering (Water/Wastewater);
BS/Mechanical Engineering
2004/PE/Civil/CA #C66241

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Oscar Gonzalez has an extensive background in program/project leadership, construction management, and civil engineering in his 35-year career. His expertise consists of public facilities, wet and dry utilities, street improvements, recreation centers, and landscaping and masonry. He has managed various phases ranging from planning and design to construction management and facility operations start-up.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belmont Plaza Pool Rebuild/Revitalization Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager for this new, $103.1M aquatics center that replaces the now-demolished Belmont Olympic Pool, which will host swimming, water polo, and platform diving events at local, regional, and national levels. Assisting with CM RFP/consultant selection process as well as with administering an application from the LACFCD DNAP program. Coordinating design and permitting of the Olympic Plaza Storm Drain upgrade. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Fontana Land Development Program
(Fontana, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Director of construction for over $70M in public improvements including backbone infrastructure and facilities that will serve new residential communities.Tasks included budget and cash flow development and review/updates; schedule development and review/updates; management of design and CM consultants; coordination with the City of Fontana and other public stakeholders; and permitting with the City and utilities.

New construction under an aggressive schedule included wet utilities, dry utilities, street improvements, masonry walls, and landscaping. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Storm Drain and Water Pipeline Project
(Highland, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction manager for this $5M project, which consisted of installation of 17,000 LF of new pipeline and included sewer, water line, and storm drain facilities, traffic control installation, public notification, and testing and disinfection of pipeline. Duties included constructability review, bid assistance, public outreach, change order negotiation, and contractor payment request review. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 30-Inch West Pipeline Project, East Valley Water District (Highland, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2014 2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction manager for this $1.4M project involving installation of 5,000 LF of new potable water pipeline, traffic control installation, public notification, and testing and disinfection of pipeline. Provided public outreach, change order negotiation, and contractor payment request review. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED New Model Colony Infrastructure Improvements
(Ontario, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Construction phase engineering and management. Responsible for multiple aspects of delivering $65M of infrastructure for the expansion of the City of Ontario annexation of the agriculture preserve, which included wet and dry utilities, roadway grading and paving, traffic signals, lighting, and striping.This project was bid with incomplete construction bid documents necessitating over $10M in negotiated change orders. [ 10 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Earl Schwartz, PE, QSD Construction Manager, Constructability Review/Value Engineering
a. TOTAL b. WITH CURRENT FIRM
29 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Engineering 2003/PE/Civil/CA #C64411; Qualified SWPPP Developer

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) With 29 years of experience, Earl Schwartz has delivered critical projects for many southern California cities and municipalities. Earl approaches all projects with a strong strategic focus and an emphasis on team building while maintaining a clear path towards achieving project goals.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ball Road Project (West Place to Claremont Street)
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Contract administration and CM services for this project (Harbor Avenue to West near Disney), which consisted of replacement and upgrade of portions of 8-inch DIP and 16-inch and 18-inch 14-gage CCP water lines and valves at the Disneyland Drive and Harbor Boulevard intersections. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Olive Street 16-inch Water Main Replacement and Roadway Restoration – Phase 2 (Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Resident engineer/CM services for this $1.1M project that involved installation of approximately 1,220 LF of 16-inch and 650 LF of 12-inch ductile restrained iron pipe and appurtenances.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Heritage Point Park and Stormwater Infiltration Project (Signal Hill, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $2.2M construction of a new public park and stormwater infiltration system to restore a barren brownfield area to provide much needed open space, wildlife habitat, environmental education opportunities, and enhancement of the City’s trail network for outdoor recreation in an urbanized, industrial area. The passive view park and miscellaneous related work includes grading, oil operations access roadway, park entry monument and gate, stacked stone retaining walls, drainage and infiltration system, hardscape, decomposed granite walkways, passive park amenities, bollards and lighting, irrigation, trees and planting, dog valet station, and miscellaneous related work. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Direct Buried Power Project
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Contract administrator for this $7.5M direct buried cable replacement project. Construction consists of installing new conduits and underground structures, cables and transformers to replace degrading direct buried electrical cables; and installation of new underground service concrete streetlights to replace existing overhead wood poles.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED New Well 22A Equipping Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this $1.6M new well project that involves demolishing the existing well site and equipping of a new well site.This includes new pump facility CMU enclosure, installation of pump and motor, pump piping, electrical facilities inclusive of VFD and motor controls, electrical meter main and switchboard, remote transfer unit, and hot tapping gate valve into an existing 24-inch collection line. Responsible for submittal and RFI reviews, conducting weekly progress meetings, change order management inclusive of merit determination and independent cost analysis and negotiation, payment applications, overseeing and coordinating all inspection and geotechnical inspection subconsultant. [ 11 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Omar Alameddine, EIT Construction Manager
a. TOTAL b. WITH CURRENT FIRM
16 6

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering EIT/CA #151070

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Omar Alameddine brings an extensive background in construction management and inspection on public works and Caltrans projects. Omar has delivered projects to renew city streets and freeways, applying his firm grasp of Caltrans and Greenbook standards. He has also managed and inspected construction of public facilities, domestic water, sewer, and drainage improvements, as well as recreational facilities.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cypress Police Department Seismic Retrofit, Emergency
Operations Center, and Modernization Project (Cypress, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspection services manager for this $3.2-million seismic upgrade and complete modernization to the interior of the existing Police Department, a 20,000-SF building with a partial basement including new electrical, HVAC, office space, conference rooms, restrooms/locker rooms, evidence room, as well as an outdoor patio and seismic retrofitting of the building. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capital Improvement Projects
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Contract administrator/construction manager augmenting the City’s Public Works staff to expedite the completion of more than $57 million in projects, such as the Indiana Street Water Main Replacement; Santa Ana Street Railroad Water Main Crossing with Metrolink/SCRRA; Underground Conversion Plan Projects; Olive Street 16-inch Water Main Replacement and Roadway Restoration Project; Rehabilitation of Pressure Regulating Stations 30 and 31 and Relocation of PRS-32 and -43 and Construction of New PRS-73; and Telecommunication Poles. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Services (including Public Works Inspection) (Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspection services manager of this on-call contract responsible for reviewing plans and specifications, conducting job walks and advising the project engineer.Takes preconstruction photos of potential areas of concern; ensures distribution of construction notifications; monitors traffic control compliance with approved traffic control plan or WATCH manual guidelines; and monitors contractor’s procurement and implementation of underground service alert notifications and delineation; and monitors contractors’ stormwater practices during grading and home building. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Signal Hill Dog Park
(Signal Hill, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for the $662,000 construction of a community dog park with artificial turf, landscaping, a parking lot, and sidewalks.

Collaborated with consultant architect and City for onsite design changes for better drainage, accessibility, and design. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carson Street Master Plan
(Carson, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Interim construction manager for a $19-million overhaul of a 1.75-mile stretch of Carson Street. Upgrades included concrete monuments, resurfaced pavement, reconfigured turn lanes and new traffic signals.The project improved Carson Street’s appearance with colorful droughttolerant landscaping, wider paver-accented sidewalks, new pedestrian lighting, outdoor benches, and bike racks. [ 12 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Mark Lewis, PE, TE Construction Manager, Project Engineer a. TOTAL b. WITH CURRENT FIRM
37 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1992/PE/Civil/CA #C49335; 1992/TE/Traffic/CA #TR1637; 2001/PE/Traffic Operations Engineer/CA # 661

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Mark Lewis is a proven leader with 37 years of engineering experience. A former director of public works/city engineer for the City of Fountain Valley, He applies an innovative approach in strategic planning, operational efficiency, financial planning, and human resources management, as well as communication, funding procurement, asset management, CIP development and implementation, project management and intergovernmental relations to deliver cost-saving solutions. Notable accomplishments include chairing the OCTA Technical Advisory and Steering Committees four times.

Participated in drafting language for OCTA Measure M2 and met with government/business leaders throughout its development and ultimate passage.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Management/Constructability Review
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager responsible for providing constructability review and project management for a water and sewer line replacement project as well as an upgrade to a sewer lift station.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City Engineering Support
(Laguna Hills, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager responsible for providing assistance with development and permit review, capital project management, staff augmentation, policies, and procedures updates, staffing services for City Traffic Commission, and other general city engineering support services. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Traffic Engineering Support
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager providing additional municipal engineering assistance with traffic operations, traffic engineering and transportation management for capital improvement projects. Responsibilities included developing traffic engineering policies, traffic commission agenda reports, reviewing development projects as they relate to traffic impacts, school traffic programs, daily traffic engineering questions/concerns. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Randall Avenue Street Improvements
(Rialto, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Program/project manager leading the design team in a three phased/three contract approach by: 1) evaluating Randall Avenue street improvements for traffic, ADA, and construction quality concerns by developing a strategic plan report; 2) directing the design effort to prepare plans for improvement, and coordinating with stakeholders; and 3) preparation of plans to widen the remaining section of roadway over a flood control channel to improve traffic flow and ADA access while eliminating a roadway hazard. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Utilities Management Support
(Huntington Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager responsible for providing organizational analysis and recommendations, assisted with development of the capital improvements program (CIP) and coordinated with supervisors and superintendents relative to operational and capital issues. [ 13 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Gafur Oyewo Construction Manager, Inspector
a. TOTAL b. WITH CURRENT FIRM
12 1

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MS/2020/Asset Integrity Management (Energy Institute Accredited); BEng/2011/Naval Architecture (ABET Accredited)
OSHA 10-Hour Construction & Safety; OSHA 30-Hour Construction & Safety

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Gafur Oyewo brings 12 years of project and construction management experience, with proficiency in large-scale public works project administrative/ management processes such as critical path management (CPM), payment/requisition processing, and safety management. He is knowledgeable in commercial and residential property rehabilitation and restoration. His experience spans projects involving a diverse range of installations, which include landscaping, roofing, asbestos abatement, masonry, steel structure erection, concrete, electrical, plumbing, and interior renovation.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miscellaneous Water Vault Nos. 10, 25, 49, and 94
Rehabilitations(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this project that involves the abandonment of vaults and associated pipes and appurtenances, as well as replacing electrical facilities and installing water line connections. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for a flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.This LEED v2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas and retail spaces.The project also involves offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard and construction of an extension of 208th Street as well as related improvements. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Alternate project inspector for the new $11.5-million LEED certified replacement to the existing Transit Center, which will consist of a 2,900-SF building housing an operator lounge, private restrooms, public restrooms, and offices, as well as a kiss-and-ride parking lot and passenger drop-off area, and bus bays.Traffic signals, striping and construction of an upper-level parking lot will also be included. Phase two improvements will involve road widening including an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Place Construction Management and Inspection
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project to provide grading and construction of the road and utility infrastructure supporting Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location. Services are focused on the grading and construction of street improvements, storm drains, domestic water and sanitary sewer lines. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alamitos Beach Concession
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for the construction of a two-story beach concession stand/restaurant and two auxiliary buildings. [ 14 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Arash Rostamian, PE, QSP, CPII Construction Manager, Inspector a. TOTAL b. WITH CURRENT FIRM
17 1

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 2020/PE/Civil/CA # C91561; Public Infrastructure Inspector; Qualified SWPPP Practitioner (QSP) #28056; OSHA 30 Hours Construction; EM 385-1-1 USACE Safety and Health; Construction Quality Control Management for Contractors (U.S. Army Corps of Engineers)

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Arash Rostamian brings 17 years of experience in construction, project management, drafting and design, estimating, inspection and quality control. He has extensive knowledge in heavy civil engineering projects, commercial and residential property, as well as steel, masonry, concrete and material construction. Arash has expertise in creating detailed reports, site supervision, quality control, managing budgets, and working closely with contractors, clients, and vendors. He is skilled in administration, inspection, and cost estimates for large and small projects; and he is proficient in Microsoft Office, Auto CAD, Primavera P6, MS Project, V360 and Sage 100 Contractor.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cypress Police Department Seismic Retrofit, Emergency
Operations Center, and Modernization Project (Cypress, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this $3.2-million seismic upgrade and complete modernization to the interior of the existing Police Department, a 20,000-SF building with a partial basement. Improvements included new electrical, HVAC, office space, conference rooms, restrooms/locker rooms, evidence room, an outdoor patio, as well as seismic retrofitting of the building.The project required substantial coordination with the Police Department to relocate police personnel to temporary trailers during construction. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Public Works Inspection
Services(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Public works inspector responsible for citywide CIP construction projects.Work includes inspection for ADA ramps, street lighting installations, all encroachment permit projects, grading, storm drain, wet and dry utilities, curb and gutter projects, sidewalk projects and all restoration projects within an encroachment permit.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Alternate project inspector for the new $11.5-million LEED certified replacement to the existing Transit Center, which will consist of a 2,900-SF building housing an operator lounge, private restrooms, public restrooms, and offices, as well as a kiss-and-ride parking lot and passenger drop-off area, and bus bays.Traffic signals, striping and construction of an upper-level parking lot will also be included. Phase two improvements will involve road widening including an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Parking Structure Lot 3 Repairs Project
(Manhattan Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project to extend the life of a parking structure. Elements included concrete repairs, sealants, traffic membrane, and waterproofing coating of the upper deck, striping new pavement, and accessibility related improvements to the parking stalls and path of travel as well as the installation of new parking meters.
[ 15 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Joe Stoakley, PE, QSD Construction Manager, Inspector
a. TOTAL b. WITH CURRENT FIRM
18 12

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 2014/PE/CA #C83184; Qualified SWPPP Developer (QSD); OSHA 10-hr Construction Program

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) With expertise in quality assurance and sustainability, Joe Stoakley is a respected construction manager, inspector and resident engineer for major municipal road and water infrastructure projects. He leverages his strengths in resolving technical issues and facilitating coordination among stakeholders.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project inspector for the new $11.5-million LEED certified replacement to the existing Transit Center, which will consist of a 2,900-SF building housing an operator lounge, private restrooms, public restrooms, and offices, as well as a kiss-and-ride parking lot and passenger drop-off area, and bus bays.Traffic signals, striping and construction of an upper-level parking lot will also be included. Phase two improvements will involve road widening including an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for a flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.This LEED v2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas and retail spaces.The project also involves offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard and construction of an extension of 208th Street as well as related improvements. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carson Street Master Plan Implementation
(Carson, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager for this complex, high-profile $19-million street revitalization of a 1.75-mile section of Carson Street, the city’s flagship street. Key improvements included wider sidewalks, public art, bicycle parking, pavement rehabilitation, new seating, landscaping, and streetlights. Facilitated resolution of key challenges such as utility conflicts and minimizing the impact of construction on motorists and businesses. Provided constructability reviews of the plans, specifications and phasing requirements and supported the bid process d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belmont Plaza Pool Rebuild/Revitalization
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant project manager for construction of $103.1-million aquatics center, including demolition of the previous pool facility.The facility will host competitive swim, water polo, and platform diving events at the local, regional and national level. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED ADA Access Ramp Improvements Phase V
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2013 2013
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction manager and inspector for $300,000 project to build 77 ADA-compliant ramps on both sides of a busy street, Rockfield Boulevard.

Project was partially funded with Community Development Block Grant funds. [ 16 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Bradley Waldrop, PE Construction Manager, Constructability Review/Value Engineering
a. TOTAL b. WITH CURRENT FIRM
33 1

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1999/PE/Civil/CA #C59724

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Bradley Waldrop has a 33-year long distinguished career of technical and operational excellence serving the civil engineering, construction management and public works industries.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bridge and Structures Constructability On-Call Services (Riverside County, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2009 2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager and constructability reviewer responsible for performing constructability reviews for bridges and structures.This role participates with Riverside County from the initial stages of the design project to help the County realize significant savings and reduced construction risks. Our team used internally developed constructability review processes to efficiently identify the areas of highest risk and largest potentials for construction claims.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Andulka Park Construction Design Changes
(Riverside, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2009 2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager, client manager, and project engineer managed the construction and performed construction inspection. During the construction phase, the original design was dramatically altered due to various field conditions and the desires of the City.The redesign of a double 36-inch storm drain system, grading, and associate retaining walls and hardscape were completed by Bradley’s team. These changes required reuse of previously ordered construction materials and use of installation techniques capable with existing equipment. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Santa Clara City Place
(Santa Clara, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal-in-charge served as owner’s representative for the construction of a new multi-phased, mixed-use development of up to 9.16 million gross square feet of office buildings, retail and entertainment facilities, residential units, hotel rooms, surface and structured parking facilities, new open space and roads, landscaping and tree replacement, and new/upgraded/expanded infrastructure and utilities. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Martinez Intermodal Facility
(Martinez, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager responsible for leading the construction portion of this project that included a 300+ parking lot north of the Martinez Amtrak Station with new access roads through parklands and across Alhambra Creek (150’ bridge), and a new 110’ pedestrian railroad overcrossing connecting the parking lot directly into the Amtrak Station. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Ranch Plan Planned Community Plan Check Services
(Orange County, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2012 2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager and structural plan reviewer for augmentation staff and the plan check team for the County of Orange, Planned Communities.

These services included plan check work for all drainage, roadway, utility, and bridge improvement plans.The Ranch Plan Planned Community project site is in the southern portion of Orange County.This development is projected to have a total of 14,000 dwelling units along with approximately 17,000 acres of open space.
[ 17 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Brian Briones Inspector
a. TOTAL b. WITH CURRENT FIRM
17 7

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 2011/Coastline Community College; 2012/Heavy Equipment Operator/ Licensed Commercial Class A Driver
Certifications: 40-Hour OSHA Hazardous Waste Site Operations (29 CFR 1910.120); Eight-Hour OSHA Confined Space, Competent Person, Hazardous Waste Site Supervisor and Forklift Safety; OSHA Excavation Safety Training for Competent Persons; Troxler Labs Nuclear Gauge Safety Certification Troxler Labs HAZMAT Certification, as required by U.S. DOT and IATA; Troxler Labs Compaction and Density Testing Certification; Certified to operate heavy equipment (Bobcat S-250 backhoe/front skid steer loader; Galion road grader; 570-LXT case skip loader with 4-by-4 Gannon)

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Brian Briones has served as a public works inspector on domestic water, sewer, and recycled water line relocations, as well as pavement renewal and storm drain construction. Brian is a competent project liaison to stakeholders such as prime contractors, other project participants and public agencies.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Services Contract
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Public works inspector monitoring grading for citywide capital improvement projects under Ardurra’s $3.6-million as-needed engineering services contract with the City. Inspections addressed ADA ramps, streetlight installation, wet and dry utilities, curb, gutter and sidewalks. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Place Construction Management and Inspection
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project to provide grading and construction of the road and utility infrastructure supporting Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location. Services are focused on the grading and construction of street improvements, storm drains, domestic water and sanitary sewer lines. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carson Street Master Plan Implementation
(Carson, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector and labor compliance specialist for this $19-million revitalization project. Project included installation of a recycled water line, pavement rehabilitation and reconstruction sections, roadway striping, concrete hardscape improvements, new irrigation and landscaping, street light modifications and monument sign installations. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Public Works Inspection
Services (Burbank, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Public works inspector providing as-needed inspection services related to the Avion project and construction inspection services for various street projects including offsite development and public right-of-way excavation permits to supplement the existing City Public Works inspection team. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sewer Main Rehabilitation Project, Phase 2
(Manhattan Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2016 2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this $1.3-million project to replace sewer mains at four street locations in the south “Sand” section of the city. Ardurra provided complete construction management services to assist in overseeing, inspecting and managing the work. [ 18 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Keith Forbes, QSP Inspector
a. TOTAL b. WITH CURRENT FIRM
33 8

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Columbia College; U.S. Army Corps of Engineers Training Certifications: Certified Erosion, Sediment and Storm Water Inspector (CESSWI), #4695; Qualified SWPPP Practitioner (QSP), #25929; NICET Railway/Subway Certification; Confined Space Entry; Working at Heights; GI Safety Induction (Coal Surface);
Resources and Infrastructure Industry Supervisor’s Course; Communicate Information, #MNCG1009/#RIICOM301; Certificates II and III in Surface Extraction Operations, #RII20209/#RII30109; Certificate III/Mining Exploration; Four-Wheel Drive Vehicle, #RII30509

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Keith Forbes has more than 30 years of construction inspection experience. His specific project experience includes roadways, bridges, highways, light and heavy rail, concrete structures, liquid natural gas storage tanks, mining/tunneling, bulk earth works, LNG plants and field compression stations, coal preparation plants, petroleum refineries as well as engineer procure and construction management projects.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Senior public works inspector for a flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.

This LEED v2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas and retail spaces, as well as offsite improvements for the installation of required utilities and road widening and related improvements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Inspection Services
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Public works inspector for construction of new homes in the Shea Baker Ranch master-planned community. Inspecting mass grading and final precise grading for new homes and construction of storm drains, area drains, curbs and gutters, sidewalks, ADA ramps, street lighting and wet and dry utilities. Inspects all projects requiring encroachment permits, and performed grading inspection for two restaurants and a U-Haul facility. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cherry Avenue Widening
(Signal Hill, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for the first phase of project extending from 230 feet south of Pacific Coast Highway to the 19th Street intersection. Services for this federally funded project were provided in compliance with federal standards and requirements, as detailed in the Caltrans LAPM. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 2017-22 Street Pavement Maintenance Rehabilitation
(Corona, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Interim construction inspection for localized removal and replacement of failing asphalt sections, grinding and overlay, crack sealing, application of ARAM, and slurry sealing approximately 68 lane miles of local and major street.There is also removal and replacement of PCC ADA ramps. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Oso Creek Multi-Use Trail
(Laguna Niguel, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2015 2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for $3-million project to construct multi-use trail.The project involved building contiguous bicycle and pedestrian/equestrian trails, stormwater control and treatment best management practices, landscaping, lighting and street improvements. [ 19 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Eric Nunez Inspector
a. TOTAL b. WITH CURRENT FIRM
32 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) AA/1980/Liberal Arts; Construction Coursework, Fullerton College; 2020/ Water Distribution & Treatment Coursework, Santiago College ICC Certified Combination Building Inspector; ICBO – Commercial Building Certified, Mechanical, Plumbing, Electrical, Building ADA, Fire Resistance, Occupancy, Green Code, Energy Code; D3 Water Distribution, State of CA

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Eric Nunez, brings significant experience, specialized training, and a record of accomplishments as a construction inspector, building inspector, water inspector, and project manager. He has successfully inspected and overseen all stages of large projects including new construction, remodels, water/ sewer projects, and road remodels/construction.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for a flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.This LEED v2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas and retail spaces.The project also involves offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard and construction of an extension of 208th Street as well as related improvements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Municipal Engineering Public Works Inspection
Services(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Public works inspector responsible for citywide CIP construction projects.Work includes inspection for ADA ramps, street lighting installations, all encroachment permit projects, grading, storm drain, wet and dry utilities, curb and gutter projects, sidewalk projects and all restoration projects within an encroachment permit.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Public Works Inspection Services
(Duarte, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector ensuring the compliance of plans, specifications, local, state, and federal laws, regulations, and ordinances for projects such as street improvements, curbs, gutters, sidewalks, streetlights, traffic signals, pavement striping, as well as sewer, water, and storm drain improvements. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Parking Structure Lot 4 Repairs Project
(Manhattan Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector. Elements included concrete repairs, sealants, and waterproofing coating of the upper deck, striping new pavement, and accessibility related improvements to the parking stalls and path of travel. Also included relocation of existing 8-inch VCP public sewer main as well as construction of 385 LF of high-strength VCP sewer, 94 LF of PVC SDR-35 sewer main, one sewer lateral, and 6 sewer manholes. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sepulveda Boulevard Sewer Relocation
(Hermosa Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Inspector for this project that involved the relocation of existing 8-inch VCP public sewer main in conflict with future private improvements.

Construction of 385 LF of High Strength VCP sewer, 94 LF of PVC SDR-35 sewer main, one sewer lateral and 6 sewer manholes. [ 20 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Chip Vanderbeek, QSP Inspector
a. TOTAL b. WITH CURRENT FIRM
44 4

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Geology/Civil Engineering Studies; HAZWOPER 40 Hour;
HAZWOPER 24 Hour Certified Supervisor; Campbell Nuclear Gauge Qualified SWPPP Practitioner (QSP) #27109
Certified Inspector of Sediment and Erosion Control (CISEC) #2688

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Chip Vanderbeek has overseen grading operations and been responsible for QC of several multi-million cubic-yard hillside and flat land grading projects. Chip’s inspection background includes inspection and testing of reclaimed and potable water systems, sewer, storm drain water, subgrade, base course, asphalt and concrete inspection, shoring and deep caisson inspection, and earth retention wall systems. Chip has performed preliminary geotechnical investigations, report preparation, asphalt and concrete inspection, foundation inspection, soils and materials laboratory work.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.This LEED 2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas and retail spaces.The project also involves offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard and construction of an extension of 208th Street as well as related improvements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Inspection Services
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for construction of capital improvements citywide. Performs wide range of inspections involving construction of new homes in the Shea Baker Ranch master-planned community. Inspecting mass grading and final precise grading for new homes in Baker Ranch neighborhoods.

Inspections address variety of elements such as construction of storm drains, area drains, curbs and gutters, sidewalks, ADA ramps, street lighting and wet and dry utilities. Inspects all projects requiring encroachment permits. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Place Park Residential Development
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspection services for paving during construction of the Ocean Place park residential development. Ocean Place is a very important park and development for the City. Construction involved site preparation, grading, slope and erosion control, sanitary sewers, domestic water, onsite and offsite street improvements, onsite and offsite storm drain and water quality BMPs. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ocean Place (Tract 17425) CM and Inspection
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector responsible for finishing of grading and drainage of a park, all offsite and onsite utility and street work, recertifying of pads used for laydown, final check of grading and area drains after the homes are built per plan. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Shea Homes at Glenwood
(Aliso Viejo, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2011 2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided inspection services for the construction of 6.4 acres of public parks that included two tot lots, several trails and fitness stations. [ 21 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Victoria Booker Labor Compliance Officer
a. TOTAL b. WITH CURRENT FIRM
16 <1

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Temecula, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MBA/Business Administration; Certificate of Completion Public Works Intermediate DIR & DOL Requirements Program 2020
Certificate of Completion Fundamentals of Project Labor Agreements 2021; Certified in Project Management, 2012

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Victoria Booker has 16 years of experience in providing labor compliance office and field oversight and related documentation support for state (DIR) and (DOL) federal (Davis-Bacon) projects. She provides labor compliance support to determine contractor compliance with the State of California, federal, and Project Labor Agreement (PLA) laws and regulations according to contract. Victoria has a deep understanding that the PLA is intended to ensure labor harmony on project jobsites and provide a uniform labor relations framework for both labor and management during the construction program. Among the goals and objectives of the PLA are to prevent work stoppages or slowdowns due to labor disputes.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Los Angeles Community College District Labor Compliance (Los Angeles County, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Labor compliance analyst for 9 community college locations involving PLA with the local building and construction unions. Provided all project reports to the DIR. Established a Community Economic Development Program to ensure that a sufficient supply of qualified District residents and graduates are hired for project work, including assisting residents and graduates commence in union apprenticeship programs. Implemented an efficient dispute resolution process and grievance procedure to resolve labor disputes when matters arise. Encouraged contracting with small businesses to reflect the diversity of Los Angeles.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Grand Avenue Project
(Los Angeles, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Labor compliance administrator for the Grand Avenue Project, which is a $1-billion urban destination center currently under construction in downtown Los Angeles. Grand Avenue is a private project with a prevailing wage requirement reporting to the City of Los Angeles Bureau of Contract Administration (BCA). Partnership with Playa Vista Job Opportunities & Business Services (PVJOBS), a non-profit organization, assisting formerly at-risk and/or incarcerated individuals re-entering the workforce through a three-phase training program. Provided tracking of MBE, WBE, SBE, EBE, DVBE.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED LAX United Airlines and SFO Airport Terminal
(Los Angeles, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
LAX: 2021; SFO: 2019 LAX: 2022; SFO: 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Labor compliance specialist for $352-million project for LAX United Airlines and a $2.4-billion airport terminal project for SFO Airport.The LAX hangar facility has enough room for two double-aisle aircraft. It replaces and consolidates two aircraft maintenance centers, and includes a parts warehouse, an engine buildup shop and a ground service equipment maintenance shop.The SFO terminal rebuild offers 25 gates. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Beeline Maintenance Facility Project
(Glendale, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Labor compliance supervisor/accounting manager for this $14-million Beeline Maintenance Facility Project with Dorado Design & Construction, Inc., providing the final design and construction.The 25,000 SF project allows the City of Glendale to have its first-ever co-located administrative, maintenance and operations facility to better support its current fleet of 37 buses and 9 demand response vehicles.This project was both federally funded (Federal Transit Administration) and locally funded (City Local Return Transportation funds) and subject to defined federal implementation and reporting requirements.
[ 22 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Dustin Blackwell Project/Documents Control
a. TOTAL b. WITH CURRENT FIRM
11 6

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Aerospace Engineering 2015/Systems Integration Engineering/California State Polytechnic University, San Luis Obispo, CA

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Dustin Blackwell is an experienced project controls and documents control specialist who produces timely, accurate documentation for a variety of municipal public works and capital improvements. Dustin completes, processes and archives construction documents related to cost estimates, project progress, payroll management, change orders, requests for information and submittals.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer for the new $11.5M Transit Center, which will consist of a 2,900-SF building housing an operator lounge, private restrooms, public restrooms, and offices. Improvements include a kiss-and-ride parking lot and passenger drop-off area, as well as bus bays.Traffic signals, striping and construction of an upper-level parking lot will also be included. Phase two improvements will involve road widening including an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alamitos Beach Concession
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer for the construction of a two-story beach concession stand/restaurant and two auxiliary buildings. Ardurra provides documents control services to streamline the workload and lessen the budget needed to complete the project. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Public Works Construction Management and
Inspection Services(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project controls/documents control for as-needed CM, public works inspection and deputy inspection for capital improvements. Projects have included R-7053 and 7056 3rd Street and Broadway Cycle Track; 15th Street Bike Blvd.; and Belmont Beach Aquatic Center; Daisy-Myrtle Bike Blvd.; LBWD Water Alley/Liberty Court; 6th Street Bike Blvd.; Drake Soccer Field; Rainbow Harbor Sewer EVAC; and Beach Maintenance Clarifier. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fountain Valley Recreation Center Exterior Improvements (Fountain Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Documents control specialist for a $600,000 project to renovate the exterior of the City’s recreation center, showing acute signs of wear after 40 years. Managed construction documents such as change order requests, a subcontractor substitution, daily inspection reports and the NOC. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Atlantic Avenue Water Main Replacement Project, Long Beach Water Department (Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Construction support specialist providing documents control for major upgrade of existing water system. This project is the second phase of a City program to replace outdated water infrastructure in the city’s Liberty Court area. Ardurra managed installation of approximately 1,200 feet of 8-inch-diameter ductile iron water main under Atlantic Avenue between Eighth and 10th Streets. [ 23 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adam Banihamed Project/Documents Control
a. TOTAL b. WITH CURRENT FIRM
3 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/California State University, Northridge

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Adam Banihamed is a documents control and project controls specialist with a passion for the structural aspect of civil engineering. Adam produces, processes, and archives construction documents related to cost estimates, project progress, payroll management, change orders, RFIs and submittals.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alamitos Beach Concession Building
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer for the construction of a 2-story beach concession stand/restaurant and two auxiliary buildings. Ardurra provided documents control services to streamline the workload and lessen the budget needed to complete the project. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belmont Plaza Pool Rebuild/Revitalization Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assists with project controls for the $103.1M aquatics center replacing the now-demolished Belmont Olympic Pool.The new facility will host swimming, water polo and platform diving events at the local, regional and national levels. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Redondo Beach Transit Center
(Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer for CM and inspection of the new $11.5M Redondo Beach Transit Center.When completed, the new Transit Center will consist of a 2,900 SF building housing an operator lounge, private restrooms, public restrooms, and offices. Improvements also include a kiss-and-ride parking lot and passenger drop-off area, as well as bus bays. In addition, traffic signals, striping and construction of an upper-level parking lot will be included. Phase two improvements will include roadway widening and will include an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping on the easterly side of the newly widened street adjacent to the Galleria Shopping Center. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Park and Ride Regional Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assists with project controls for this $21M flagship terminal for the City’s 11-route agency, Torrance Transit, and other public transportation providers.This LEED v2009 Gold project includes parking for buses and automobiles, covered passenger boarding areas, offices, employee break areas, and retail spaces.The project also involves offsite improvements for the installation of required utilities, the widening of Crenshaw Boulevard, and construction of an extension of 208th Street as well as related improvements. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capital Improvement Projects
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls officer assisting the City of Anaheim’s Public Works staff to expedite completion of more than $57 million in projects. Projects have included Olive Street 16-inch Water Main Replacement/Roadway Restoration; Rehabilitation of Pressure Regulating Stations (PRS) 30, 31 and Relocation of PRS 32 and 43, and construction of new PRS-73; and Underground Conversion Plan Projects. [ 24 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Dee Yeh Project/Documents Control
a. TOTAL b. WITH CURRENT FIRM
10 1

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Facility Planning and Management

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Dee Yeh has 10 years of experience providing project support in both publicly and privately funded construction and design projects. Dee produces, processes, and archives construction documents related to cost estimates, project progress, payroll management, change orders, RFIs and submittals.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Cypress Police Department Modernization Project
(Cypress, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Assistant construction manager/project controls specialist so the seismic upgrade and renovation improvements to the existing Police Department’s 20,000-SF, single-story building with a partial basement including a roof-stiffening system for seismic strengthening, relocating interior walls and making lighting upgrades, ADA improvements and architectural enhancements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Signal Hill View Park Improvement Project
(Signal Hill, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project controls/documents control specialist for this park construction using grant funds under a negotiated contract with the Conservation Corps of Long Beach (CCLB). Park construction includes rough grading, drainage, retaining walls, pedestrian trails, landscaping and irrigation, site furnishings, and lighting.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Olive Street 16-inch Water Main Replacement Project
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project controls/documents control specialist for this project involving improvement of water system reliability by replacing old 10- and 6-inch cast iron pipe with new 16-inch ductile iron pipe.The project also included the replacement of fire hydrants, valves, water services, and appurtenant structures.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Torrance Transit Regional Park-and-Ride Terminal
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project controls/documents control specialist for the construction of a flagship facility for City’s bus service, Torrance Transit and other regional bus carriers. Improvements include 17,800 SF of space and multiple bus bays, building access, circulation roads, street widening, relocating underground utilities, sidewalks, curb and gutter, signs, landscaping and new or upgraded traffic signals. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belmont Plaza Pool Rebuild/Revitalization Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project controls/documents control for this $103.1-million project to construct a world-class aquatics facility replacing the now-demolished Belmont Olympic Pool.The new facility will host swimming, water polo and platform diving events at the local, regional and national levels.

Helped prepare an application to the California Coastal Commission for a Coastal Development Permit. Ardurra is spearheading value engineering analyses and a subsequent entitlement and community outreach project to adjust the project to available funding sources. [ 25 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Anissa Voyiatzes, PE, QSD,
ENV SP Project Engineer
a. TOTAL b. WITH CURRENT FIRM
28 3

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1997/PE/Civil/CA #57710; Envision Sustainability Professional/Institute for Sustainable Infrastructure Qualified SWPPP Developer/California Stormwater Quality Association

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Anissa Voyiatzes has 28 years of experience in civil engineering planning, design, program and project management for transportation and public works facilities.These projects have included bikeway, roadway widening, rehabilitation, ADA compliance evaluation and improvements, complete streets and streetscape projects, utility engineering, site grading, traffic engineering, flood control facilities, drainage systems, sewer and water systems, parking lots and retaining walls. Anissa specializes in public works engineering projects that incorporate sustainable design practices.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Market Street Pedestrian and Streetscape Enhancements
Project, (LA River to Cherry Avenue) (Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Quality control manager for the design of the roadway and for a pedestrian and streetscape enhancement project on Market Street between the LA River and Cherry Avenue, an approximate 1.9-mile stretch of the corridor.The project consists of complete street improvements including Class II/IV bike lanes and other new bike/pedestrian facilities, bulbouts, wayfinding signage, sidewalk widening, crosswalk and transit stop enhancements, construction/ reconstruction of curb ramps for ADA compliance, repairing sidewalks, curbs, and gutters, reconstructing/ resurfacing roadway pavement, pedestrian lighting, traffic signal installation/upgrades, flashing beacons, landscaping and street trees, removing/relocating obstructions and utilities, and miscellaneous sustainable design features for improved mobility and safety. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Long Beach Pedestrian Accessibility Improvements Design (Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Senior project manager responsible for evaluation and design of curb ramps to support the Citywide Curb Ramp program. Managed the development of the City’s Self Evaluation/Transition plans and is continuing that work with the citywide implementation for the placement and upgrade of all curb ramps at 22,000 locations, as well as ramp evaluation for ADA compliance, schematic and final design, and cost estimating. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plaza del Amo at Western Mobility Enhancement, T-177
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Senior project manager for the preparation of construction documents for the roadway widening of Plaza del Amo from 223rd Street to Western Avenue to improve circulation and safety. Improvements include widening of the roadway on the north side, addressing roadway and stormwater deficiencies, restriping, curb and sidewalk and ADA compliant ramp upgrades. Processed Caltrans Encroachment Permit for modifications and improvements at Western.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-210 Soundwalls, Supplemental Environmental Report
(NBSSR) and PS&E Phase III (La Cañada Flintridge, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Engineering services group leader for the design of three separate soundwalls along the I-210 freeway.The project has included soundwall design along a hillside slope, several edges of travel ways, and over bridges. As part of this design, the project has involved significant coordination with the City of La Cañada Flintridge, Caltrans, and the design team. [ 26 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Lisette Bice, PE, QSD, ENV SP Project Engineer
a. TOTAL b. WITH CURRENT FIRM
18 3

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 2014/PE/Civil/CA #83157; Qualified SWPPP Developer (QSD); Qualified SWPPP Practitioner (QSP) #83157

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Lisette Bice is a dedicated civil engineer highly skilled in all phases of public works engineering projects. Her expertise includes planning and design of streets, right-of-way engineering, pedestrian paths (trails) and cyclist safety improvements, grading, sewer, water, and storm drains, identifying seismic and geometric deficiencies, preparing erosion control plans, SWPPP and permitting.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pedestrian Accessibility Improvements Design
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager providing an evaluation and design of curb ramps to support the Citywide Curb Ramp program. Ardurra staff managed the development of the City’s Self Evaluation/Transition plans and is continuing that work with the citywide implementation for the placement and upgrade of all curb ramps at approximate 22,000 locations.The project includes ramp evaluation for ADA compliance, schematic and final design, and cost estimating.To date our team has designed 185 ramps. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Delta Bike Boulevard Project
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm As part of our on-call contract, this $3 million project includes Class II and Class III bike lanes and shared lane markings, traffic circles, a roundabout, pavement repairs, a new traffic signal, and wayfinding signage from Harbor Avenue from 10th Street to 20th Street, and Delta Avenue from 20th Street to Wardlow Road (approximate 3-mile corridor). The project is funded through ATP grant and local match. Managed the project and grant funding in collaboration with City staff and design consultant. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plaza del Amo at Western Mobility Enhancement, T-177
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project engineer for the preparation of construction documents for the roadway widening of Plaza del Amo from 223rd Street to Western Avenue to improve circulation and safety. Improvements also include widening of the roadway on the north side, addressing roadway and stormwater deficiencies, restriping, curb and sidewalk and ADA compliant ramp upgrades. Processed Caltrans Encroachment Permit for modifications and improvements at Western.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Market Street Complete Streets, (LA River to Cherry Avenue) FTIP #LAF7615 (Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager providing engineering and design services for a Complete Street Project on Market Street between the LA River and the eastern city limit just east of Cherry Avenue, an approximate 1.9-mile stretch of the corridor.The project consists of complete street improvements including the removal of a drive lane to accommodate Class II bike lanes, intersection bulbouts, wayfinding signage, sidewalk widening, crosswalk and transit stop enhancements, construction/reconstruction of curb ramps for ADA compliance, sidewalk and driveway repair, reconstructing/resurfacing roadway pavement, pedestrian lighting, signal modifications, landscaping and street trees, and storm drain improvements.
[ 27 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Jose Hernandez, PE, QSD/P Project Engineer, CADD Lead
a. TOTAL b. WITH CURRENT FIRM
24 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MBA/California State University of Long Beach; BS/Civil Engineering 2005/PE/Civil/CA #68384; California Certified QSD/QSP: No. 024024

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Jose Hernandez began his successful career as an intern for Caltrans District 12 while completing his undergraduate degree at CSU Pomona. Jose has experience overseeing projects of varying size and complexity through design, permitting and construction. Jose’s accomplished projects have won ASCE Project of the Year for Airports and Ports and for Urban and Land Development.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Civil Engineering – Street Design/Rehabilitation Projects(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Ardurra staff has prepared PS&E for more than $16 million in improvements since 2009. Projects have encompassed roadway, storm drain, parking lot improvements, traffic, lighting, and landscape improvements, design of more than 250 ADA-compliant curb and ramps and focused on many of the major roadways within the city. Ardurra staff has consistently provided the City with well-designed projects facilitating smooth construction. Projects include Market Street Ped Improvements, (LA River to Cherry Ave.); Atlantic Ave. Pedestrian Enhancements; Atlantic Ave./ Claiborne Drive Bulbout; Atherton Street and Magnolia Ave. Street Rehabilitation; and Alamitos Ave. Rehabilitation Improvements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lincoln Avenue Improvements
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager for design services for this project to widen Lincoln Avenue from a 4- to 6-lane divided street.The scope included clearing and grubbing, excavation, placement of new AC pavement, construction of concrete curb and gutter, driveways, access ramps, sidewalks, bus pads, drainage system improvements, relocation of existing facilities, installation of a traffic signal, traffic signal modifications, signing, striping, landscaping, and a WQMP. Successes included streamlining traffic flow, increased drainage capacity and an overall enhanced street appearance. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jasmine Storm Drain Low-Flow Diversion Design, Capital
Program Management (Laguna Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager overseeing the design of a low-flow system design for the Jasmine Street Storm Drain project, which includes diverting urban flows toward a trash collection system and a sewer diversion device. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED As-Needed Engineering Design for Various CIP Projects
(Brea, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager responsible for providing as-needed design and civil engineering services for the City’s capital improvement projects that include street improvements, traffic safety enhancements, water improvements, storm drain improvements, sewer improvements, facility improvements and community facility district improvements. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Randall Avenue Roadway Improvements
(Rialto, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design manager for this project that involved developing ADA improvements along a stretch of roadway almost a mile long, as well as sidewalks including ADA ramps, striping improvements, and traffic signal improvements. [ 28 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Joe Buckner, PE, PLS, QSD Project Engineer, Survey
a. TOTAL b. WITH CURRENT FIRM
36 9

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1989/PE/CA #45531; 1995/PLS/CA #7206; Qualified SWPPP Developer and Practitioner (QSD) #22494

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Joe Buckner has more than 35 years of experience in the planning and design of streets, highways, and freeways, highways and arterial streets, right-of-way engineering, grading, sewer, water and storm drains. Joe has substantial experience with engineering of public works improvements, CAD drafting and preparing survey and right-of-way legal mapping.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lincoln Avenue Widening Design
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project engineer provided ROW and engineering design services for this project that will widen 3,000 feet of Lincoln Avenue from East Street to Evergreen Street.The project included the design of median, street, traffic, storm drain, landscape and private property improvements as well as the preparation of an alignment study, traffic study, legal descriptions and a Water Quality Management Plan. Responsible for the preparation of permanent dedications for street right-of-way and also for temporary construction easements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lake Forest On-Call Map Checking
(Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm As part of the on-call map checking services for the City of Lake Forest, lot line adjustments and final maps were reviewed for conformity to City Conditions of Approval, technical correctness and compliance with the Subdivision Map Act. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Westminster Avenue Storm Drain
(Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2016 2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project engineer for the preparation of calculations and a report to determine the adequate size to convert an existing trapezoidal open channel drainage facility to a closed conduit storm drain system. The project included hydrologic and hydraulic analyses, extensive field work, evaluating various alternatives, cost estimates and recommendations. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED La Habra Boulevard Improvements (Beach Boulevard to
Idaho Street) (La Habra, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Under our on-call contract, prepared PS&E for this roadway rehabilitation project to remove and replace (R&R) damaged sections of asphalt concrete pavement; base paving with an ARHM cap. Additionally, Ardurra field walked the segment to identify PCC R&R’s for curb, gutter, sidewalk ADA ramps, and driveways. Signing and striping plans were prepared, bike lanes were added for both east and westbound directions.

Ardurra coordinated with and obtained an encroachment permit through Caltrans for replacement of loops at Beach Boulevard. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Civil Engineering
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager for the preparation of PS&E for more than $15-million in improvements. Storm drain projects included in this on-call contract are located on Seaside Way, Lew Davis Street and 6th Street. [ 29 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Miguel Hurtado, PE Project Engineer
a. TOTAL b. WITH CURRENT FIRM
13 7

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MA/Public Administration; BS/Civil Engineering 2017/PE/Civil/CA #88091

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Miguel Hurtado is a design engineer with significant civil engineering experience. Miguel has been involved with pedestrian and streetscape enhancements, roadway widening, raised medians, and restriping, as well as PS&E preparation for the rehabilitation and reconstruction of streets, including pavement recycling experience using FDR and CIR. He is proficient in AutoCAD, Civil 3D, inRoads and ArcGIS and has an in-depth knowledge of Southern California plan and specification criteria and standards.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lincoln Avenue Widening
(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design engineer responsible for the widening of Lincoln Avenue, between East Street and State College Boulevard, pavement reconstruction, median island construction, curb and gutter construction, sidewalk construction, parkway construction, driveway construction and curb ramp upgrades.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Civil Engineering
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design engineer for the preparation of PS&E for projects that have encompassed roadway, storm drain, parking lot, traffic, ADA, lighting, and landscape improvements and focused on many of the major roadways within the city. Specific projects include Seaside Way Storm Drain, Atlantic Avenue Bulbouts, Santa Fe Avenue Rehabilitation, Atherton Avenue Rehabilitation, 10th Street Rehabilitation, Alamitos Avenue Rehabilitation, 6th Street Bus Stop Relocation, Spring Street, Redondo Ave, and Magnolia Street. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jasmine Street Storm Drain
(Laguna Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design engineer for the preparation of PS&E for the conceptual and final design for the Jasmine Street storm drain improvements in the City of Laguna Beach. The recommended alignment allows for intercepting the upstream-most culvert that outlets onto private property; collects runoff on an interim basis from the adjacent drainage basin; and takes advantage of the existing downstream culverts, which outlet directly to the beach. The project included a hydrologic and hydraulic analysis of the Jasmine Drainage Basin as well as the adjacent easterly and westerly drainage basins. Pipe jacking was required across Coast Highway to minimize traffic disruptions and an Encroachment Permit was required from Caltrans.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Engineering Services
(Downey, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design engineer for preparing PS&E for more than $20 million in improvements under this on-call contract. Projects include roadway, storm drain, parking lot, traffic, lighting, landscape, and private property improvements. Others involve additional lanes, median and parkway improvements, decorative lighting and street furniture, and enhanced colored-concrete intersections and parkway paving. Projects to date include Firestone Avenue Rehabilitation, Brookshire Avenue Pavement Rehabilitation, Bellflower Boulevard at Imperial Highway Intersection Improvement, La Habra Boulevard Improvements (Beach Boulevard to Idaho Street), and Annual Arterial Street Rehabilitation FY2019-2020. [ 30 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Andrea Mosqueda, PE Project Engineer
a. TOTAL b. WITH CURRENT FIRM
5 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(Newport Beach, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil-Environmental Engineering 2021/PE/Civil/CA #99376

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Andrea Mosqueda has 5 years of experience in civil engineering. Andrea has solid experience participating in design and water resources projects.With a tenacity to learn and apply acquired skills, Andrea seeks to grow into a well-rounded civil engineer and contribute to the betterment of infrastructure in the communities she serves. Andrea is bilingual in English and Spanish and possesses skills in concept development, hydrology, hydraulics, watershed modeling, water quality monitoring, public speaking, and volunteer management. She is proficient in multiple engineering software programs including ArcGIS, AutoCAD Civil 3D, HEC-RAS, WMS, and XPSWMM.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Cove - Phase VI, Century Housing
(Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Senior designer for the preparation of demolition, grading, horizontal control, utility, and roadway plans. Project will replace six single-story buildings with a new five-level building for veterans. Project involved new sewer lines, upgraded storm drain facilities, rerouted gas, and water lines as well as a new street geometry.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jasmine Storm Drain Low-Flow Diversion Design
(Laguna Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project designer involved in the design of a low-flow system design for the Jasmine Street Storm Drain project.The project design includes diverting urban flows toward a trash collection system and a sewer diversion device. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plaza del Amo at Western Mobility Enhancement, T-177
(Torrance, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project designer for the street improvements for Plaza del Amo in the city of Torrance.The project consists of widening the existing roadway, which involved pavement design, the relocation of an existing drainage inlet, and development of a drainage study. Andrea played a major design role in this project.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-210 Soundwalls, Supplemental Environmental Report
(NBSSR) and PS&E Phase III (La Cañada Flintridge, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design engineer for the design of three separate soundwalls along the I-210 freeway. The project has included soundwall design along a hillside slope, several edge of travel ways, and over bridges. As part of this design, the project has involved significant coordination with the City of La Cañada Flintridge, Caltrans, and the design team. Andrea has played an integral role in this project. [ 31 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Fong Tse, PE Project Engineer
a. TOTAL b. WITH CURRENT FIRM
37 2

15. FIRM NAME AND LOCATION (CITY AND STATE)
(El Segundo, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Civil Engineering 1997/PE/Civil/CA #56980

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Fong Tse is a California registered professional civil engineer with more than 35 years of municipal civil engineering experience. Fong’s experience includes design and construction of roads, slopes, harbor infrastructures, parks, community centers and essential facilities. Fong served as a development engineer and was responsible for plan checking small and large private commercial developments and residential tracts.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plan Check and Development Coordination Services
(Brea, Lake Forest, and Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
ongoing N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Currently performing professional plan check and development coordination services for the Cities of Brea, Lake Forest, and Long Beach. Scope includes the review of grading, storm drain, street, utilities, site development plans, hydrology and hydraulic analyses, mapping, and water quality. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Engineering Services
(Garden Grove, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Senior project engineer serving as a resource for the design team on various projects. Responsibilities included preparing and reviewing project PS&Es, conducting field reviews, and processing RFIs and submittals. CIP projects included Orange Unified School District Various High School Fields Rehabilitation, City of La Mirada Imperial Highway Rehabilitation, City of La Mirada Alondra Boulevard Rehabilitation, City of La Mirada Neighborhood Street Rehabilitation – Phase 6, City of La Habra Brio Park Water Play Construction, City of La Habra Osete Park Water Play Construction, and City of South Gate Park Restroom Replacement. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Engineering Services
(Newport Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Served in various increasingly responsible positions within the CIP and Development Sections of the City of Newport Beach. Responsible for assigned staff and budget. Prepared and reviewed RFQs, RFPs, proposals, consultant selection, bids, contracts, PS&Es, grant and permit applications, City Council and City Manager Reports and budget requests. Served as project manager for assigned projects from concept to City acceptance. Conducted employee performance evaluations. CIP projects included Newport Beach Civic Center and Park; New Big Canyon Reservoir Storage Facility; San Miguel Park Restrooms Building Replacement; Park Avenue Bridge Replacement over Grand Canal and Balboa Cove/Marine Avenue Bridge ADA Access Path; San Joaquin Hills Road Reconstruction (AHRP); Jamboree Road Reconstruction (AHRP); and Newport Boulevard Rehabilitation
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Plan Check Services
(Newport Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Reviewed, plan checked, and conditioned all developments for the City of Newport Beach, including tentative and final parcel maps and tract maps, conditional use permits, variances, approval in concept. Facilities included Hoag Hospital Cogeneration, Fletcher Jones Mercedes Motorcars, Newport Lexus, Sterling BMW, Newport Land Rover, Holiday Inn, Connexant, Marriott (Newport Coast) Timeshares, Fashion Island Properties, and Pelican Hill Resorts per the Subdivision Map Act, City standards and requirements, City municipal code and City Council policies.

Plan checked approximately 1,600 residential and commercial construction projects each year. Negotiated/approved encroachment permits and agreements for County Recording. Developed development fee schedule. [ 32 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Ronald Hanson, CEG, PG Material Testing
a. TOTAL b. WITH CURRENT FIRM
37 10

15. FIRM NAME AND LOCATION (CITY AND STATE)
Geo-Advantec (San Dimas, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS/Geology; Graduate Courses in Geology California Certified Engineering Geologist #1841; California Professional Geologist #5143

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Ronald Hanson is a California Professional Geologist with over 37 years of experience performing geological/geotechnical investigations, geologic/soils inspections and preparing geological reports. He has supervised and worked on numerous grading operations and was the lead geologic inspector of the CC Ranch project in Castaic, a large project that consisted of 4M yards of soil being moved. He has worked as the Public Works Inspector of Record.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection for Redondo Beach South Bay Regional Intermodal Transit Center (Redondo Beach, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Senior inspector for this project that involved the construction of a new transit building, bus bays, retaining walls, parking lot and associated appurtenances. During construction GAI performed field monitoring, testing and inspection for the grading work, laboratory tests on soils, base asphalt and concrete, and preparing and submitting daily inspection reports. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Eisenhower Memorial Park Improvement Project
(Arcadia, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal engineering geologist for this project that involved construction of two restroom/concession facilities, baseball fields, parking area, dog park, scoreboard, new bleachers, shade shelters, and a pedestrian bridge. GAI performed a geotechnical plan review, geotechnical engineering evaluation/investigation, and during construction geotechnical materials inspection and testing for the park renovations. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Investigation, Field Observation and Testing for Avenida Entrada, et al., Street Improvements(San Dimas, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Principal engineering geologist for this project that involved rehabilitation of residential street improvements, including FDRR of the entire asphalt concrete and base layer, reworking of the subgrade soils, and placing back well-compacted layers of base and asphalt concrete. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pavement Engineering, Field Inspection and Testing for
Washington Blvd. Rehabilitation (Commerce, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Field supervisor/principal engineering geologist for this project that involved the rehabilitation, reconstruction, and widening covering a

2.7-mile-segment of Washington Boulevard, widening of the boulevard from two lanes to three lanes in each direction. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Slope Failure Cause Investigation and Slope Stability
Evaluation at Ganesha Park (Pomona, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Field supervisor/principal engineering geologist for this project that involved slope failure on the ascending slope above Paige Drive in Ganesha Park. GAI performed site observation and investigation; prepared a report that discussed the observed failures and causes; and provided temporary mitigative measures for stabilizing the slope. Due to urgency of the task and satiability concerns, GAI completed the investigative tasks and entire scope of work in less than a week.
[ 33 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Dominique McGee Material Testing
a. TOTAL b. WITH CURRENT FIRM
3 <1

15. FIRM NAME AND LOCATION (CITY AND STATE)
Geo-Advantec (San Dimas, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) High School Diploma ACI Concrete Field Testing Technician-Grade I (#1404510); APNGA Portable Nuclear Gauge Safety & USDOT Hazmat Certification

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Dominique McGee has performed as inspector of soil, concrete, and asphalt on several public works projects in Southern California.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical and Materials Testing and Inspection for Cypress Police Department Modernization (Cypress, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the modernization of the existing police department building, which includes new utilities, a new patio and seismic retrofitting.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Services for Torrance Transit Park & Ride
Regional Terminal, Phase I-Rough Grading (Torrance, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved a proposed one-story and a two-story building, bus platform, canopies and pavement of the designated areas. Provided geotechnical services, grading observation and soils testing for different components of the project.The purpose of testing and inspection of the grading operations was to verify that the completed work complied with the project plans, specifications, special provisions, and geotechnical recommendations.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 3rd Avenue, Starhill Lane, Don Julian Road, and Basetdale Avenue Waterline Improvements(Industry, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved construction of new water lines along 3rd Avenue, Starhill Lane, Don Julian Road and Basetdale Avenue, which included removing the existing pavement, trenching and backfilling and replacing with new pavement. Provided field monitoring, testing and inspection for the utility trench work, and prepared and submitted daily inspection reports. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection for San Manuel Band of Mission Indians for San Manuel 66-kV Substation (Highland, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the construction of a new substation, which included placement of new electrical lines and trenches, perimeter wall, utilities and pavement replacement.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soils/Materials Testing and Inspection for Modernization of Leuzinger High School Athletic Fields/Facilities(Lawndale, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector/technician for this project that involved the renovation/reconstruction/modernization of the athletic fields and facilities at Leuzinger High School. GAI's work included field inspection and testing for soils, concrete and masonry; welding, NDT testing and field-pull testing and observation; laboratory testing on soils, concrete, and masonry; providing daily reports on field observations and testing; and providing DSA 291 and 293 reports.
[ 34 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Ivan Canales Material Testing
a. TOTAL b. WITH CURRENT FIRM
1 1

15. FIRM NAME AND LOCATION (CITY AND STATE)
Geo-Advantec (San Dimas, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BA/Sociology (Minor in Education) ICC: SI Soils Codes Module; Special Inspector General Requirements (#9801915); APNGA Portable Nuclear Gauge Safety Certification

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Ivan Canales has performed as inspector of soil, concrete, and asphalt on public works projects in Southern California.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Services for Torrance Transit Park & Ride
Regional Terminal, Phase I-Rough Grading (Torrance, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved a proposed one-story and a two-story building, bus platform, canopies and pavement of the designated areas. Provided geotechnical services, grading observation and soils testing.The purpose of testing and inspection of the grading operations was to verify that the completed work complied with the project plans, specifications, special provisions, and geotechnical recommendations. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection for Redondo Beach South Bay Regional Intermodal Transit Center (Redondo Beach, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved construction of a new transit building, bus bays, retaining walls, parking lot and associated appurtenances. During construction, GAI provided field monitoring, testing and inspection for the grading work, laboratory tests on soils, base asphalt and concrete; and preparing and submitting daily inspection reports. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Materials Testing and Inspection Services for the
Reconstruction and Overlay of Covina Boulevard (San Dimas, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the reconstruction and overlay of Covina Boulevard from the 57 freeway on-ramp to Arrow Highway, as well as the removal and replacement of existing curb and gutter, curb ramps, and sidewalk reconstruction. Provided field monitoring, testing and inspection for the street pavement work, and prepared and submitted daily inspection reports. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Monitoring and Materials Testing Services for Descanso Drive Street Improvements(La Canada Flintridge, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector for this project that involved the resurfacing of Descanso Drive from Verdugo Blvd. to Chevy Chase Drive in the city of La Canada Flintridge.The project also included the removal and replacement of existing curb and gutter, sidewalk and drive approach reconstruction. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soils and Materials Testing and Inspection for Lakewood High School Track and Field (Lakewood, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Inspector/technician for this project that involved replacement of existing track with an all-weather track surface; replacement of the electronic scoreboard; reconstruction of the existing bleachers to create accessible seating; and replacement of the field with synthetic turf. GAI's scope included soils/grading monitoring and testing, testing of concrete and reinforcing steel, earth work/soils inspection, asphaltic concrete plant inspection, asphaltic concrete placement inspection, concrete batch plant inspection, concrete placement inspection and sampling, concrete and masonry sampling and testing, and all other field inspection and laboratory testing, as required. [ 35 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Jay Helekar Cost Estimating
a. TOTAL b. WITH CURRENT FIRM
25 14

15. FIRM NAME AND LOCATION (CITY AND STATE)
HL Construction Management (Orange, CA)

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) AA/Cal State University, Long Beach LEED AP BD+C (US Green Building Council)

18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC.) Jay Helekar brings 25 years of preconstruction cost estimating consulting experience with public sector projects. He understands the preconstruction effort of publicly funded projects and the challenges and cost implications of the planning and design. As principal and founder of HLCM, Jay oversees a premier estimating team that provides project controls including cost estimating, change order analysis, scheduling,and constructability reviews. He was selected to teach a series of cost estimating courses for an intern training program at a themed entertainment park in Anaheim.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Adventure Playground
(Yorba Linda, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a construction document estimate milestone for a scope for a new water slide, mud pit, rope swing, wiffleball field, and zipline.The Master Plan includes newly added amenities such as a rock climbing wall, treehouse structures and suspension bridges, splash pad and water features, large shade/seating area, a meandering creek, and updated storage areas. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Anthony Munoz Community Center
(Ontario, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2019 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved schematic, design development, and construction document milestones for a new 60,000 SF community center, construction of a new single-story recreation and aquatic center featuring an MPR, a modern kitchen, an activity room, tot room with tot playground, a new youth playground, swimming pool with large pool deck, and paved courtyard and mountain-view terrace. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rancho Cordova Little League Facilities Renovation
(Rancho Cordova, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a schematic design milestone estimate. Scope included a modular building with concessions, storage and restrooms, sitework, and an FFE owner purchase aluminum bleacher.The project was funded by the City’s Community Enhancement Fund. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Aquatics and Recreation Center
(Yucca Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2020 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a ROM and 50% schematic design milestone estimate. Funded by a $22M state grant, this aquatics and fitness center includes a hybrid indoor pool, additional new indoor recreation amenities, a one-court gymnasium. Exterior improvements include a splash pad, an exercise walking/jogging path, multi-purpose landscape areas, and surface parking. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Corona Del Mar High School Sports Fields Newport-Mesa USD (Newport Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Cost estimator for this project that involved a design development and construction document milestone estimates. Scope includes replacement of existing track and field with new synthetic turf field, modernization of existing men’s/women’s restrooms, perimeter fencing, associated grading and site work, irrigation and landscape work, site lighting and electrical work. [ 36 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
1 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Cypress Police Department Seismic Retrofit, Emergency Operations Center, and Modernization Project (Cypress, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2022 2022

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Cypress Nick Mangkalakiri 714.234.4717

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra performed bidability and constructability reviews and peer cost estimating services.The existing Police Department structure was an approximately 20,000-square-foot, single-story building with a partial basement.The City used a roof-stiffening system for seismic strengthening.The improvements entailed relocating interior walls and making lighting upgrades, ADA improvements and architectural enhancements.

Each design submittal bidability/constructability review is a result in Ardurra’s submittal of redlined plans and a punch list of comments and recommendations for the City’s consideration and implementation with the project architect/engineer. Ardurra reviewed the plans for bidability and constructability and identified potential value engineering solutions, ambiguities, conflicts and/or omissions that became apparent during its review.The bid documents and technical specifications were reviewed for potential duplication/overlap of clauses, conflicts, proper placement of critical requirements within the order and precedence of documents. Ardurra recommended key contract provisions to provide the necessary controls and remedies for the City to maintain a proactive approach on the project. Ardurra was also recently awarded construction management and inspection services to oversee the successful completion of construction activities associated with this project.The project includes interior improvements, structural improvements, exterior improvements, and temporary/phased improvements.

Project Value: $3.2 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA
Bidability and Constructability
Reviews, Construction Management,
Inspection
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE HLCM Orange, CA Cost Estimating
[ 37 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
2 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Redondo Beach Transit Center (Redondo Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
Ongoing Ongoing

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Redondo Beach Andrew Winje, PE 310.749.4000

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra is providing construction management and inspection along with other professional services required to undertake and successfully manage construction of the Redondo Beach Transit Center Project. Phase one of the project includes construction of a new Transit Center to replace the existing Transit Center located adjacent to the Galleria. The new Transit Center will be constructed at a site south of Target along Kingsdale Avenue.When completed, the new Transit Center will consist of a 2,900-square-foot building housing an operator lounge, private restrooms, public restrooms, and offices. Other improvements will include a kiss-and-ride parking lot and passenger drop-off area, as well as bus bays. In addition, traffic signals, striping and construction of an upper-level parking lot will be provided.

Improvements in phase two will include the widening and realignment of Kingsdale Avenue between Grant Avenue and Artesia Boulevard.This roadway improvement will include an additional dedicated northbound right turn lane, new sidewalk, streetlights, and landscaping on the easterly side of the newly widened street adjacent to the Galleria Shopping Center.

Construction Value: $11.5 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Construction Management, Inspection b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE [ 38 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Torrance Transit Regional Park-and-Ride Terminal (Torrance, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
Ongoing Ongoing

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Torrance Craig Bilezerian, PE 310.618.3054

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra provides construction management, inspection and special/deputy inspection and testing services for this 15,000-square-foot regional terminal on 15 acres along Crenshaw Boulevard near the 405 Freeway.The hub for Torrance Transit, the City of Torrance’s multi-line bus service, will connect the carrier’s routes with those of other providers.The Torrance Transit Center is also anticipated to connect with the Metro Green Line as part of the Green Line Master Plan. The terminal will be constructed to LEED Gold standards and will be served by eight bus bays. Plans call for a passenger drop-off zone, layover space, and a parking lot with about 250 spaces.

The project is being constructed in two phases.The completed Phase 1 focused on rough-grading the site and building the underground drainage system. Phase 2 includes the buildings and parking lot, as well as circulation roads and utilities. Related offsite improvements include construction of a cul-de-sac extension of 208th Street and widening of Crenshaw Boulevard for a new right turn pocket and traffic signal improvements.

One of Ardurra’s first tasks was a constructability review of the project’s plans (273 sheets) and specifications. Ardurra assisted the City during the bid phase, coordinating responses to bidder questions, substitution requests and compiling and issuing bid addenda. Ardurra also assisted the City with evaluation of submitted bids, as well as addressing a bid protest and assisting with preparation for City Council award of the construction contract.

Ardurra construction phase services included assisting the City with establishing an efficient web-based project administration portal and coordinating with a multitude of project stakeholders. Project stakeholders include City departments, utilities, adjacent property owners, contractors and subcontractors, as well as the project architect and subconsultants.

Other tasks entail performing schedule and budget reviews, processing/coordinating RFI responses, submittals and change management.

Providing and coordinating geotechnical and deputy inspection services through its subconsultants, including Geo-Advantec.

Construction Value: $21 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Construction Management, Inspection b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Geo-Advantec San Dimas, CA Geotechnical, Material Testing [ 39 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Capital Improvement Projects(Anaheim, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
Ongoing Ongoing

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Anaheim Jake Hester, PE 714.765.4421

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra provides project management and construction management services to oversee completion of more than $57 million in capital improvement projects for the City of Anaheim. Combined Project Value: $57.2 million. Projects and services have included the following:
▪ Fire Station No. 5. Contract administration and CM for $5.4M design-build construction of a 9,400-SF fire station on one acre that included parking, driveways, sidewalks, walls, fences, landscaping, water, sewer gas, telephone/cable and electrical utilities, transmissions lines and facilities.Winner of 2018 BEST Award from the APWA Southern California chapter. ▪ Indiana Street Water Main Replacement. One of the City’s first design-build projects.This design-build project consists of the construction of approximately 2,400 LF of 6-inch ductile iron CL 52 zinc-coated water main, and 200 LF of 8-inch ductile iron CL 52 zinc-coated water main. The project also included the replacement of fire hydrants, valves, water services, and appurtenant structures. ▪ Imperial Highway and Big Sky Lane Water Main Replacement. This design-build project consists of the construction of approximately 3,580 LF of 12-inch C909 water main, 1,542 LF of 8-inch C909 water main, and 250 LF of 4-inch C909 water main. ▪ Santa Ana St. Railroad Water Main Crossing with Metrolink/SCRRA.This project consists of boring and jacking trenchless installation method, furnishing, and installing approximately 70 LF of 24-inch steel casing pipe welded joints and 12-inch zinc-coated ductile iron pipe class 56 and by open-cut construction method, furnishing and installing approximately 75 LF of 12-inch zinc-coated ductile iron pipe class 52. ▪ State College Blvd. and La Palma Intersection Widening. Augment City staff with CM, inspection, and contract administration services. ▪ Gene Autry Way Widening. CM for this $6.8M project to widen and make significant related improvements to portions of two arterials. ▪ Citywide Sanitary Sewer Improvement Program/Projects, Group 6. Contract administration and CM for $2M project to build more than 4,200 LF of 24-inch,18-inch,15-inch and 10-inch VCP sewer mainline. Included 19 manholes, removing the existing mainline and manholes, rebuilding the street and installing new traffic loops, striping and pavement markers. ▪ La Palma Water Complex – Reservoir Rehabilitation and Pump Station Replacement. Provided contract administration for $9.3M project. Managed demolition of 3-MG reservoir and pump station and rehabilitation of 4-MG reservoir, construction of new pump station, and abandonment of inactive well.
▪ Olive Street 16-inch Water Main Replacement and Roadway Restoration Project.CM for the improvement of water system reliability by replacing old 10- and 6-inch cast iron pipe with new 16-inch ductile iron pipe. The project also included the replacement of fire hydrants, valves, water services, and appurtenant structures.
▪ Lincoln Avenue 16-inch Water Main from Beach Boulevard to Dale Avenue.Contract administration for $2M project to construct more than 5,300 LF of 16-, 12-, 10-, 8-, 6- and 4-inch ductile iron pipe, 12 fire hydrants, and more than 58,500 SF of asphalt concrete paving. ▪ Underground Conversion Plan Projects. Contract administration and CM management for the following projects as part of the City’s Underground Conversion Five-Year Plan and Wildfire Mitigation Plan. The initiative is relocating overhead power and communications systems underground and is intended to improve aesthetics, replace antiquated equipment, and enhance the reliability of the area’s electrical system. ▪ Rehabilitation of Pressure Regulating Stations (PRS) 30 and 31 and Relocation of PRS-32 and -43 and Construction of New PRS-73.Contract administration and CM services for completion of various on-call water utilities projects. ▪ Telecommunications Poles Coordination and Inspection. Smart communication effort includes inspections for installation of streetlight pole foundations, traffic control, and closeout submittal packages.

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Project Management, CM, Inspection, Contract Administration
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE HLCM Orange, CA Cost Estimating
[ 40 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED On-Call Public Works Construction Management and Inspection (Long Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
Ongoing Ongoing

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Long Beach Eric O. Lopez 562.570.5690

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra is providing the City with CM and inspection services under a three-year contract geared toward a wide range of public works projects, from street rehabilitation to storm drains.The bench of professionals assigned to this contract includes project managers, construction managers and construction inspectors, as well as deputy inspectors for work related to buildings and other types of structures. Project Value: $30 million. A sample of the projects include the following:
▪ Daisy-Myrtle Bicycle Boulevard. Ardurra managed construction of this 9.5-mile, north-south bikeway extending from downtown Long Beach to north Long Beach. This project, part of the City's Bicycle Master Plan, creates a safer way for cyclists to reach the Wrigley, Los Cerritos and Bixby Knolls neighborhoods.The Class 1 bike path bikeway runs along Daisy Avenue to the south and Myrtle Avenue to the north. ACEC California recognized this project with a 2019 Engineering Excellence Award. ▪ 3rd and Broadway Cycle Track. The City of Long Beach has led Southern California in building innovative, bike-friendly roadways. Ardurra helped the City improve the safety and convenience of two existing protected bike lanes (called cycle tracks), each about one mile long, in Downtown Long Beach passing through the city’s core.The area is home to dozens of businesses, restaurants, hotels, condos, homes, police station, churches, libraries, parking structures and new developments. Before this project, the cycle tracks ran along the left-hand sides of two busy one-way streets, 3rd Street and one block south, Broadway. Now, each cycle track will be moved to the right side of the road, where drivers anticipate seeing bicyclists. ACEC California recognized this project with a 2020 Engineering Excellence Award. ▪ Rainbow Harbor Commercial Sewage EVAC System Replacement. Construction management for $700,000 replacement of 20-year sewage EVAC pump-out that serves the vessel operators at Rainbow Harbor.The project involved abandoning the centralized, underground twin-tank sewage pump-out system (under vacuum) with seven smaller dock-side peristaltic pumps, converting the system to a pressurized sewage evacuation system. Additional work consisted of replacing the hoses under gangways, installing new stainless steel valves and fixing compromised PVC piping as needed.
▪ Heartwell Park Central Irrigation Renovation. Ardurra is providing preconstruction services and reviewing plans and specifications for construction, supporting and collaborating with the Construction Management Division and other as-needed duties may include completing assignments from the Construction Services Officer.
▪ 6th Street Bicycle Boulevard. Creation of an east-west bicycle boulevard along 6th Street.The 2.5-mile route extends from Junipero Avenue on the east to Bellflower Boulevard on the west.The project installed a Class 1 bike path, traffic circles, a roundabout with curb extensions and bioswales to control drainage and a bump-out and curb extensions.The project also added bike loop detection to an existing traffic signal, signage and fresh pavement markings.
▪ Beach Maintenance Clarifier Project. Construction management/inspection for installation of a water recovery system that collects and treats wastewater overflow.The clarifier system is at the Beach Maintenance Yard, near the Belmont Plaza temporary swimming pool. ▪ Drake Soccer Field Project. Construction management for this $3.8-million project on 8 acres included two soccer fields, a basketball court, parkway with trail, parking lot, new lighting, and landscaping.Work involved demolition and grading, installing a park drainage system, concrete curbs, gutters, sidewalks, curb ramps, driveways, and paving asphalt surfaces. In addition to providing the community with a new recreational area, the project conserved energy and reduced waste by using a significant percentage of recycled construction materials, drought-tolerant landscaping, and by separating and recycling at least 60 percent of all construction debris. ▪ Long Beach Boulevard Blueline Median. Construction inspection services for this mass-transit median project.

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Construction Management, Inspection b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra Temecula, CA Permit Management, Inspection
[ 41 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
6 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED On-Call Municipal Engineering and Public Works Inspection (Lake Forest, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2021 2021

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Lake Forest Tom Wheeler, PE 949.461.3480

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra has a multi-year contract to provide municipal engineering services.Tasks include reviewing land use applications; plan checking development plans and maps; inspecting approved land development construction; inspecting approved work in the public right-of-way; public works encroachment permit inspection; water quality program management; and providing additional staff on an as-needed basis.

Primary services have involved engineering implementation of the City's Opportunity Studies Area (OSA) that comprises five developments totaling over 4,000 housing units; design of the Los Alisos Boulevard resurfacing project; conducting the annual sidewalk survey; and inspection of the catch basin insert project.The OSA projects involve plan check and inspection of all facets of development including map approval; rough grading; precise grading; street and storm drain improvements; park development; and median and parkway improvements. Other land development projects have been approved other than the five OSA projects, including The Meadows, Parkside, Encanto, and residential housing in the Auto Center.

There are currently four major residential development projects within the city. During the next three years (2021-2024), it is expected that all four projects will be completed. Once completed, approximately 5,000 new residential units would have been constructed.

Under this multi-year contract, Ardurra has performed plan checking and reviews for the following: entitlement review; subdivision maps; hydrology and hydraulics reports; street improvement plans; grading plans; water quality management plans and encroachment permits.

Project Value: $3.5 million (04/2011 to 04/2016); $9.8 million (04/2016 to 06/2021)

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA
Program/Project Management,
Inspection, WQMPs, Traffic Engineering,
Encroachment Permits, Flood Control,
Roadways, Parks
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra Newport Beach, CA
Program/Project Management,
Inspection, WQMPs, Traffic
Engineering, Encroachment Permits,
Flood Control, Roadways, Parks
[ 42 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
7 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Municipal Engineering, Project Management, and Inspection (Seal Beach, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
Ongoing Ongoing

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Seal Beach Iris Lee, PE 562.431.2527 Ext. 1322

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra has completed several projects for the City of Seal Beach during the last 5 years. Engineering services have included providing civil engineering, geotechnical, traffic and survey services for various projects within the city. Improvements have included the design of water and sewer main reconstruction, alley paving, the upgrade or addition of ADA ramps, pavement rehabilitation, hydrology and hydraulic calculations and the preparation of a proposed storm drain report.

Ardurra is currently providing the City with constructability review and project management for the City’s 6th Street Alley Improvement Project (including waterline and sewer replacement) and Sewer Pump Station #35. Improvements include the design of water and sewer main reconstruction, alley paving, installation of empty fiber optic conduit for future fiber, and ancillary improvements followed by concrete paving of the entire width of the alley.The Pump Station #35 project provides for upgraded/new dry well and wet well for the pump station.

For the Ocean Place Development project, Ardurra is providing plan checking and inspection for grading and construction of the road and utility infrastructure that will support Ocean Place, which is a neighborhood of 30 luxury homes in an environmentally sensitive beachfront location. Services are focused on the grading and construction of street improvements, storm drains, domestic water and sanitary sewer lines. Of importance will be ensuring the use of stormwater management best practices and compliance with the terms of a California Coastal Commission development permit since the project is in an environmentally sensitive area. The project will include a 6.5-acre public park to be turned over to the City by the developer. Long known by Seal Beach locals as “the DPW Property,” the land was once the site of a Los Angeles Department of Public Works steam-generating plant, built in 1925. The plant was shut down in 1951 and demolished in 1967.

Plan check services have included review of the hydrology and hydraulic analysis, grading plans, street plans, traffic striping and signing, street lighting, signal plans, storm drain plans, utility plans, landscaping and planting, WQMP, sewer and water plans.

Other projects have included:
▪ Ocean Avenue Alley Waterline and Sewer Replacements from Main Street to First Street. Prepared the design of over 0.5 miles of alley improvements in the downtown area of Seal Beach. The project included the design of sewer and water mains and pavement. Ardurra completed an extensive utility investigation including significant potholing and GPR to locate the existing utilities.The design also included solving numerous existing drainage problems that existed within the alleys. ▪ 7th Street Alley Waterline and Sewer Replacement. Ardurra prepared complete PS&E for this project, which involved designing the replacement of approximately 450 LF of existing 6-inch water and sewer mains. In conjunction with the utility replacement, rehabilitation of approximately 6,750 SF of asphalt and concrete pavement was also designed. ▪ Westminster Avenue Storm Drain Study Report. Ardurra prepared a report to determine the adequate size to replace a trapezoidal open channel drainage facility with a pipe on the north side of Westminster Avenue from Seal Beach Boulevard to the Federal Storm Channel (CO1S06). Conducted hydrologic studies of the tributary area and develop discharges at various concentration points for 5, 10, 25, and 100-year storm events. Coordinated with Orange County Flood Control District and met with Orange County Public Works staff to discuss the most up to date planning and to identify the interim and ultimate conditions for the confluence with the Federal Storm Channel.Work also included hydraulic analyses to analyze the existing system with the 5, 10, 25, and 100-year storm flows to establish existing level of protection and facility constraints. Developed alternative enclosed facilities (box culverts and pipes) to handle the runoff from the 100-year storm event.

Cost estimates were prepared including design, construction, and contract administration/inspection for each alternative.

Project Value: $6 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Inspection, Constructability Review b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra Newport Beach, CA Project Management, Engineering, Plan Checking, Staff Augmentation
[ 43 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
8 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Signal Hill On-Call City Engineering Services(Signal Hill, CA) PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
Ongoing Ongoing

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Signal Hill Kelli Tunnicliff, PE (former Signal Hill Public Works Director, now
with City of Lakewood)
562.209.0037

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra provides city engineering services for the City of Signal Hill including capital improvement program management; staff augmentation; general engineering review, design, and analysis; development review and plan check; and project management services for various public works CIP projects including management of the design and construction of the City’s first dog park. Ardurra is also managing the design and construction of View Park that involves the design of the City’s reclaimed water system, which will connect with the City of Long Beach.

Ardurra performs a multitude of project management services including CIP management and administration for design through construction; preliminary engineering and analysis for project development and feasibility studies; CIP planning, budgeting, and scheduling; permit/grant administration; coordination with adjacent agencies, state/regional/federal agencies, and utilities. ▪ Signal Hill View Park Improvement Project.The City is constructing a park using grant funds under a negotiated contract with the Conservation Corps of Long Beach (CCLB). The total estimated construction cost is approximately $2.2 million. Park construction includes improvements such as rough grading, drainage, retaining walls, pedestrian trails, landscaping and irrigation, site furnishings, and lighting. ▪ Signal Hill Dog Park. Ardurra managed construction of a dog park for the enjoyment of the area’s canine residents and their owners.

The project is located just south of the I-405 Freeway between Atlantic and Orange Avenues. Dog park features include new artificial turf, landscaping, a parking lot and sidewalks.The park is enhanced with play mulch, crushed-granite walkways, seating, lighting, fencing, and drinking fountains.Throughout the project, Ardurra’s construction manager worked closely with the City’s inspector and public works director.

As part of construction management services, Ardurra provided public outreach in the field, quality assurance of work performed, participated in progress meetings and ensured safe conditions as well as compliance with plans and specifications.

Project Value: $3.3 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Project/Program Management, City Engineering, Plan Check, CM
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra Newport Beach, CA Project/Program Management, City Engineering, Plan Check, CM
[ 44 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
9 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Carson Street Master Plan (Carson, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017 2017

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Carson Successor Agency Gilbert M. Marquez, PE 310.830.7600

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra provided construction management, inspection, and related support services for this $19-million overhaul of a 1.75-mile stretch of Carson Street.The project has transformed Carson Street between the I-110 and I-405 into a welcoming town center gateway.The project was part of far-reaching renewal efforts in Carson under the City’s master plan. Upgrades included decorative concrete street monuments, resurfaced pavement, reconfigured turn lanes and new traffic signals.

Other enhancements included public art and new medians with drought-tolerant landscaping; wider, paver-accented sidewalks; new sidewalk lighting; and outdoor benches and bike racks.

Awarded APWA Project of the Year, the project’s scale is reflected in the following list of improvements:
▪ 555 new trees planted
▪ Approximately 100,000 square feet of new median and
bump-out planter landscaping
▪ Approximately 13,000 linear feet of new curb and curb/gutter ▪ Approximately 4,800 linear feet of new recycled waterline ▪ Approximately 32,600 square feet of new accent architectural pavers ▪ Approximately 530,000 square feet of rubberized asphalt overlay ▪ Installation of 13 new transit shelters, 36 new bike racks, 29 new trash receptacles, 13 new seating nodes, 23 new
wayfinding signs and 3 new monument towers
Project Value: $19.5 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Construction Management, Inspection b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE [ 45 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY
NUMBER
10 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Fountain Valley Recreation Center Exterior Improvements (Fountain Valley, CA)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018 2018

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Fountain Valley Temo Galvez, PE 949.294.4508

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ardurra provided project and construction management for this $1-million project to renovate the outside of the City’s recreation center that was showing signs of wear after 40 years of use. Project management services included coordinating with the project architect and the City’s Public Works Department and Building and Safety Department to obtain required approvals for the proposed design. Also coordinated and prepared the City’s front-end specifications for inclusion of the technical specifications and packaged the construction documents for bidding. Attended all project-related meetings, including the City Council meeting, and coordinated contract for signature.

Ardurra provided construction management services for improvements to aging stucco, antiquated roof and windows, and deteriorating wood shake siding.The recreation center serves as an important gathering place for the city, which lacks a designated downtown area. Among the many community activities hosted in the complex and adjacent park are classes, concerts, meetings, the “Market in the Park” and additional activities for people of all ages. Construction management services also included coordinating with City staff to keep the facility open to the public while construction activities were ongoing, requiring extensive community outreach activities.

Project Value: $1 million

25. FIRMS FROM SECTION C INVOLVED IN THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Ardurra El Segundo, CA Project Management, Construction Management, Building Inspection
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE [ 46 ] City of Cypress On-Call Construction Management, Engineering Support, Testing & Inspection Services | May 5, 2022

29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Cypress Police Department Seismic Retrofit, Emergency Operations Center, and Modernization Project
6 City of Lake Forest On-Call Municipal Engineering and Public Works Inspection
2 Redondo Beach Transit Center 7 Seal Beach Municipal Engineering, Project Management, Inspection 3 Torrance Transit Regional Park-and-Ride Terminal 8 Signal Hill On-Call City Engineering Services 4 City of Anaheim Capital Improvement Projects 9 Carson Street Master Plan 5 City of Long Beach On-Call Public Works CM and Inspection 10 Fountain Valley Recreation Center Exterior Improvements G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS

26. NAMES OF KEY PERSONNEL
(From Section E, Block 12)

27. ROLE IN THIS CONTRACT
(From Section E, Block 13)

28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Dino D’Emilia, PE, F.ASCE, QSD PIC, Constructability Review/Value Engineering X X X X X X X X Amy Czajkowski, PE, CCM, QSD/P QA/QC & Technical Review X Steve Badum, PE Project Director X X X X X
John Wolitarsky, CCM CM, Constructability Review/Value Engineering X X X X X X X Oscar Gonzalez, PE Construction Manager X
Earl Schwartz, PE, QSD CM, Constructability Review/Value Engineering X X X X Omar Alameddine, EIT Construction Manager X X X X X X X Mark Lewis, PE, TE Construction Manager, Project Engineer X X Gafur Oyewo Construction Manager, Inspector X X X X X
Arash Rostamian, PE, QSP, CPII Construction Manager, Inspector X X X X Joe Stoakley, PE, QSD Construction Manager, Inspector X X X X X Bradley Waldrop, PE CM, Constructability Review/Value Engineering Brian Briones Inspector X X X
Keith Forbes, QSP Inspector X X X
Eric Nunez Inspector X X X
Chip Vanderbeek, QSP Inspector X X X
Victoria Booker Labor Compliance
Dustin Blackwell Project/Documents Control X X X X X
Adam Banihamed Project/Documents Control X X X X
Dee Yeh Project/Documents Control X X X X
Anissa Voyiatzes, PE, QSD, ENV SP Project Engineer X
Lisette Bice, PE, QSD, ENV SP Project Engineer
Jose Hernandez, PE, QSD/P Project Engineer, CADD Lead X Joe Buckner, PE, PLS, QSD Project Engineer, Survey X X X Miguel Hurtado, PE Project Engineer X X X
Andrea Mosqueda, PE Project Engineer
Fong Tse, PE Project Engineer X
Geo-Advantec Material Testing X X
HL Construction Management Cost Estimating X X X

PROPOSAL

ON-CALL CONSTRUCTION MANAGEMENT,

ENGINEERING SUPPORT, TESTING AND

INSPECTION SERVICES

CITY OF CYPRESS
MAY 5, 2022
27372 Calle Arroyo / San Juan Capistrano, CA 92675 / 949.450.2525 On-Call Construction Management, Engineering Support, Testing and Inspection Services i Cover Letter
May 5, 2022
Nick Mangkalakiri, P.E
City of Cypress
5275 Orange Avenue
Cypress, California 90630
Subject: On-Call Construction Management, Engineering Support, Testing and Inspection Services Dear Mr. Mangkalakiri,
Dudek appreciates the opportunity to submit our qualifications for OnCall Construction Management, Engineering Support, Testing and Inspection Services to the City of Cypress (City). Our Construction Management Division has completed numerous similar projects to the projects listed in the City’s Capital Improvement Program (CIP). We have direct experience providing construction management and inspection services on similar projects, including street improvement, traffic signal, sewer, storm drain, park, and public building projects.

Local Experience and Approach to On-Call Services
Dudek is currently providing as-needed construction management and inspection services to local cities in the area, including Whittier, Anaheim, Huntington Beach, and Fountain Valley. We have very similar ongoing projects in the area that are similar to the City’s projects listed in the CIP and will potentially be able to share staff and resources to keep costs down.

Our construction management, engineering, and environmental professionals have extensive experience providing as-needed services to counties, cities, water districts, wastewater agencies, and special districts throughout southern California. Our team provides construction management and inspection, civil engineering, operations and management, environmental analysis and planning, regulatory, and funding expertise to offer public agencies a cost-effective way to accomplish short-term and long-term goals. The key to as-needed services is seamless integration into your agency’s processes. We train our professionals to first, understand how your team and processes work, and second, apply our expertise within that structure. The result is maximized efficiency without sacrificing valuable time and energy. Our method of integration has led to more than 170 successful municipal as-needed contracts, several of which have extended past 20 years.

The Dudek Advantage
With an established presence in the area for over 30 years, Dudek has an extensive resume performing construction management and inspection services. Our proposal demonstrates Dudek’s understanding of the scope of work and how we have successfully provided on-call services to other municipalities similar to the City.

FIRM INFO
Dudek (HQ)
605 Third Street
Encinitas, CA 92024
Local Offices
27372 Calle Arroyo
San Juan Capistrano, CA 92675
38 North Marengo Avenue
Pasadena, CA 91101

MAIN POINT OF CONTACT
George Litzinger, PE
Principal/CM Division Manager
(619) 980-7048
[email protected]
On-Call Construction Management, Engineering Support, Testing and Inspection Services ii Personnel Dudek’s team has extensive construction management, testing, and inspection experience with current and past projects in neighboring cities. Consequently, we have local personnel that are ready and available to assist the City on this contract.

Specific Project Experience Dudek has extensive experience in the management and inspection of the projects identified in the City’s CIP. Our proposal includes descriptions of our recent as-needed contracts and related experience to roadway, traffic signal, storm drain, sewer, park, and building projects, both large and small, in the area and throughout southern California.

Extensive Public Relations Experience Our personnel have extensive experience dealing with the public, particularly with the residents that will be impacted by the various types of projects we may be managing and inspecting. The key is to proactively work with the residents and businesses through regular and effective communication. We will work with the contractor and City to prepare a comprehensive and proactive PR program to minimize complaints throughout construction.

Economy of Scale With our current local projects and work in the area, we will be able to utilize our local personnel by efficiently managing and sharing resources that will translate into cost savings for the City. George Litzinger, Manager of Dudek’s Construction Management Division, will work with the City to put the most productive and efficient team in place to manage your projects.

Dudek Understands the Issues Having completed numerous public works projects over the last 35 years, we understand the issues that will need to be addressed throughout the projects. Our team is up to speed on potential issues and ready to hit the ground running on construction. Issues will be proactively addressed at the start of the project with the contractor. We understand that we will serve as an extension of City staff and will coordinate closely with the City’s project managers throughout construction, keeping them informed of the status of the project so there will be no surprises.

Conflict of Interest: Dudek has no financial, business, or other relationship with the City of Cypress that may have an impact upon the outcome of this contract.

We appreciate your consideration of this proposal. Joe Monaco, President, is authorized to bind the firm. Mr.

Monaco designates George Litzinger as primary contact during proposal evaluation and negotiation.

Sincerely,
__________________________________ _____________________________________ George Litzinger, PE Joe Monaco, AICP
Project Principal President/CEO
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
George Litzinger, PE

13. ROLE IN THIS CONTRACT
Principal in Charge/Construction
Manager/Contract Administrator

14. YEARS EXPERIENCE
a. TOTAL
36 b. WITH CURRENT FIRM
36 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, California)

16. EDUCATION (Degree and Specialization)
B.S./1985/Civil Engineering
A.S./1981/Mechanical Engineering

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer, California #47544
California Contractor – Engineering Class “A” License
#731744

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) As the CM Division Manager, he is responsible for all of Dudek’s construction projects and programs covering both large and small projects up to $100 million. Mr. Litzinger has managed a variety of projects for both the private and public sectors including water/sewer, reservoirs, pump stations, pipelines, parks, streets and roads, drainage projects, fire stations and a variety of public buildings. (Awards: 2012 CMAA San Diego Chapter Project Achievement Award; 2011 CMAA So. CA Chapter Project Achievement Award; 2009 CMAA National Chapter Award; 2008 and 2009 ASCE Buildings and Structures Award of Excellence.)

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Recycled Water Pipeline CM and Inspection, Solana Beach, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Litzinger was project principal overseeing the construction management and inspection of this recycled water pipeline within the City of Solana Beach. The project was part of a larger Sewer, Water, Arterial, Paving (SWAP) Project, which had a tight schedule requiring completion of all construction in less than six (6) months and involved various stakeholders: City of Del Mar, San Diego Fairgrounds, SEJPA, City of Solana Beach, and Santa Fe Irrigation District. b.
(1) TITLE AND LOCATION (City and State)
Connors Park, San Marcos, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Litzinger was project principal on this 4.5-acre park project built on San Marcos Elementary School property under DSA jurisdiction. The project consisted of demolition of an existing school and park, mass grading, a reinforced concrete fenced and lighted multisport court (tennis/basketball/pickle ball), skate park, a fenced and lighted synthetic multi-use football field, Musco Sports Lighting parking lot, energy efficient lighting system. The project also included a separate design/build contract for a 2,000 SF masonry restroom/concessions and maintenance facility. This project was funded by a Community Development Block Grant (CDBG). c.
(1) TITLE AND LOCATION (City and State)
Carlsbad Safety Center, Carlsbad, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012-2013
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Litzinger was the Project Manager on new construction of three masonry buildings consisting of a 36,697 square foot (SF), two story, shooting range and classroom facility, a 6,558 SF, four story, commercial burn prop training tower, and a 2,246 SF, two story, residential burn prop, plus a concrete paved training grounds that includes a car extrication area, trench rescue area, an underground confined space rescue area, artwork site, site lighting, masonry perimeter security wall, landscaping, and installation of onsite water sewer, recycled water, and storm drain pipelines. d.
(1) TITLE AND LOCATION (City and State)
Rancho Santa Fe Road Widening Project Phase I & II, Carlsbad, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008-2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Principal in Charge for this $35 million dollar roadway improvement project. Project involved widening the road from a two-lane, highly impacted roadway to a six-lane (three lanes in each direction) prime arterial roadway, grading, blasting, and demolition of an existing bridge and construction of two new bridges over San Marcos Creek. e.
(1) TITLE AND LOCATION (City and State)
Autumn Drive Street Improvements and Reconstruction of Buelow Park, San Marcos, California
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2010-2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Litzinger was the Principal in Charge for this $2 million improvement and reconstruction project consisting of replacement of the existing storm drainage system, private water and sewer systems, dry utilities, retaining and seat walls, restroom buildings, street parking, lighting, fencing and gates, playground and shade structures, curbs and gutters, street surface improvements, ribbon gutter, water play features, and basketball courts.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Jason Linsdau, CCM

13. ROLE IN THIS CONTRACT
Construction Manager

14. YEARS EXPERIENCE
a. TOTAL
19 b. WITH CURRENT FIRM
17 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
B.S./Civil Engineering

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) CMCI Certified Construction Manager, ID #5042
ITCP; MACP; PACP; AGC Advanced SWPPP Training 8-
Hour Course

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Jason Linsdau has more than 19 years’ supervision and leadership experience in engineering and construction. As a construction manager/resident engineer, he manages construction projects ranging between $1.5 million and $25 million. Mr. Linsdau has worked on a variety of projects for public agencies and municipalities, including parks, fire stations, administration buildings, reservoirs, pipelines, pump stations, treatment plants, golf courses, dams, roads, and drainage projects.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Court Street Park, Del Mar, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Linsdau was the construction manager for the construction of a new park in the City of Del Mar. The project consisted of grading, irrigation, 15,000 SF of landscaping, road improvements, monument sign, and DG trail. The project also included grading, restoration, and re-vegetation of an existing meandering channel through the park. Dudek provided construction management, inspection services and environmental monitoring on this project. b.
(1) TITLE AND LOCATION (City and State)
Home Plant Lift Station and Force Main Replacement, Carlsbad, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Linsdau provided CM and inspection services to construct a new submersible lift station with a PVC-lined wet well, bubbler level control, odor control bed, new emergency generator, emergency storage structure, influent sewer piping and manholes, flow meter and valve/camlock vaults, new controls and electrical panel located in the control building, new site fencing, new and restored landscaping, recycled irrigation, asphalt paving, and 1,900 LF of 8-inch HDPE force main. c.
(1) TITLE AND LOCATION (City and State)
2014-2017 Chip Seal and Seal Coat Projects, San Marcos, California (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014-2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Linsdau was the construction manager for the Citywide annual chip seal and slurry seal street rehabilitation projects. The project consisted of resurfacing over 130 residential streets and City parking lots with a 1.2 M SF of 5/16-inch chip seal (Type Pass CR scrub seal) and 4.3 M of Type 2 slurry seal and 1.2M of Type 1 slurry seal. The project also included permitting and coordination with Caltrans and NCTD RXR.
d.
(1) TITLE AND LOCATION (City and State)
Connors Park, San Marcos, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Linsdau was the CM on this 4.5-acre park project built on San Marcos Elementary School property under DSA jurisdiction. The project consisted of demolition of an existing school and park, mass grading, a reinforced concrete fenced and lighted multisport court, skate park, a fenced and lighted synthetic multi-use football field, Musco Sports Lighting parking lot, energy efficient lighting system. The project also included a separate design/build contract for a 2,000 SF masonry restroom/concessions and maintenance facility. This project was funded by a CDBG Grant (CDBG). e.
(1) TITLE AND LOCATION (City and State)
Fire Station No. 6, Carlsbad, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Linsdau was the construction manager for the wood frame and masonry block, two-story, 6,200-square-foot Fire Station No. 6 for the City of Carlsbad. The project also consisted of a 400-foot concrete paved driveway, 1,400 feet of PVC waterlines, joint utility trenches, 400 feet of gravity sewer line, a new traffic signal, median improvements on Rancho Santa Fe Road, and demolition of Temporary Fire Station No. 6. Mr. Linsdau performed constructability reviews of the project at the 90% and 100% design phases and coordinated the enforcement of permits with the U.S. Fish and Wildlife Service (USFWS) and the California Department of Fish and Game (CDFG).

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Marius Jaskula, PE, CCM

13. ROLE IN THIS CONTRACT
Construction Manager

14. YEARS EXPERIENCE
a. TOTAL
29 b. WITH CURRENT FIRM
11 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
University of Illinois at Chicago
B.S./Civil Engineering

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer, State of CA, Civil #C61060
U.S.A.C.E. Construction Quality Management Cert.

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Over twenty-five years of experience in construction management, contract administration, and quality assurance on civil public works infrastructure projects. Projects have included sewer, water and storm water pump/lift stations, reservoirs, sewer and water treatment facilities, Caltrans structures, roadway construction, large earthwork projects, and water, sewer and drainage pipeline projects with tunneling. Positions held have been the following: Construction Manager for U.S. Government (Navy), Construction Manager/Resident Engineer for a municipality and engineering consulting firms, and a Quality Control Manager and Superintendent for a General Contractor.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
V1: West Vista Way Sewer Project, Vista, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Jaskula was Construction Manager and Resident Engineer for this project, which involved deep open trenching for the replacement and upsizing of sewer mains from 8-inch up to 15-inch along with a micro-tunneled section across Emerald Drive.
b.
(1) TITLE AND LOCATION (City and State)
Terramar Lift Station and Forcemain Replacement Project, Carlsbad, California
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm CM/RE for $2.8 million city project to replace the failing existing station and increase emergency storage capacity. The HLPS consists of a submersible lift station with a PVC lined wet well, three 25HP submersible pumps, bubbler level control, odor control bed, new emergency generator, emergency storage structure, influent sewer piping and manholes, flow meter and valve/camlock vaults, new controls and electrical panel located in the new control building. c.
(1) TITLE AND LOCATION (City and State)
Coastal Rail Trail Reach 1 Improvements/Carlsbad Blvd. Roundabout, Carlsbad, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm CM for $1.2 million city project providing new trails and bike paths on Carlsbad Blvd. (Coast Hwy 101) and North County’s first coastal roundabout at Carlsbad Blvd. and State St. The roundabout provides a welcoming and astatically pleasing gateway to Carlsbad’s northern border while improving safety for vehicular traffic, bikers and pedestrians. d.
(1) TITLE AND LOCATION (City and State)
Water Recycling Demonstration Project, Anaheim, California (2) YEAR COMPLEED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm RE/CM for $6.5 million city project serving as a demonstration facility showcasing the viability of recycled water and the value of conserving limited potable water supplies. The project consists of a 50,000 gallon per day (gpd) capacity (100,000 gpd at buildout) Membrane Bio Reactor (MBR) water reclamation facility at the north side of the City Hall. Project includes an influent pump station with sewer diversion structure, force main and a recycled water distribution system to surrounding landscaped areas and to the dual plumbed water system at Anaheim West Tower. e.
(1) TITLE AND LOCATION (City and State)
Recycled Water System Expansion, San Clemente, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Resident Engineer for $8.2 million multi-phase City project to install 10 miles of recycled water pipelines (6-inch to 20-inch PVC and DI), HOA service conversion connections, Bella Collina Towne & Golf Course Metering Station and new Pressure Reducing Station. The project also included a new 200,000-gallon DN tank. Mr. Jaskula managed all aspects of construction and provided daily inspection services.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Chad Costello

13. ROLE IN THIS CONTRACT
Construction Manager

14. YEARS EXPERIENCE
a. TOTAL
24 b. WITH CURRENT FIRM
12 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) American Concrete Institute - 8-hour seminar
American Shotcrete Institute - 8-hour seminar

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Chad Costello has more than 20 years of construction experience, the past 10 of which have focused on reservoir and public works projects. He began his career in working for the local pre-stressing tank contractor working only on concrete reservoir construction projects. Working his way up to superintendent in a very short time period, Mr. Costello left the construction side of pre-stressed tank construction after working on 18 pre-stressed reservoirs. He then began working as a construction manager, resident engineer and construction inspector of a wide range of reservoir, pipeline, building and public works projects for Dudek.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Recycled Water System Expansion, San Clemente, California (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Costello provided resident engineering services on 10 miles of recycled water pipelines that also includes a 200,000 gallon DN tank. He is managing all aspects of construction and providing daily inspection services. He also handled all resident inquiries and coordinated with the city’s public relations representative. b.
(1) TITLE AND LOCATION (City and State)
Ole Hanson Beach Club Rehabilitation, City of San Clemente (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Costello was the construction manager and inspector for this historic 6,000 SF building rehabilitation project. He managed all aspects of construction and provided daily site and building inspection services. The project also included the removal and installation of a new chemical delivery control system for the two large public pool facilities as part of this project.
c.
(1) TITLE AND LOCATION (City and State)
Miscellaneous Pipelines and Storm Drains Projects, City of San Clemente
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Costello was the construction manager and inspector for several large- and small-diameter water pipeline and storm drain projects. He provided RFI and submittal reviews, contract administration, and public relations services on these projects.
d.
(1) TITLE AND LOCATION (City and State)
Conifer Tank Replacement, Triunfo Sanitation District, Ventura, California
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2013
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Costello was the construction manager and inspector on the 2.1 MG Conifer Tank Construction Project. He provided RFI and submittal reviews, contract administration, and public relations services. He also inspected every aspect of the project, coordinating the special inspection and geotechnical/laboratory services. e.
(1) TITLE AND LOCATION (City and State)
Various Pre-stressed Concrete Tanks, Southern California (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Various
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm As a DYK employee, Mr. Costello has worked on pre-stressed concrete water tank construction. He was Superintendent for the following projects: City of Vacaville, Vacaville, California, 5 MG Tank; City of Fullerton, Fullerton, California, 5 MG Tank; City of Ontario, Ontario, California, 6.0 MG Tank.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
William Gallegos

13. ROLE IN THIS CONTRACT
Construction Manager

14. YEARS EXPERIENCE
a. TOTAL
42 b. WITH CURRENT FIRM
18 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
M.S./Structural Engineering
B.S./Civil Engineering

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Civil Engineer, CA
US Army Corps of Engineers

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) William Gallegos is a highly qualified construction manager who previously worked over 20 years for the US Army Corps of Engineers. As a resident engineer for over 18 years, Mr. Gallegos was responsible for various construction projects to a combined minimum total of $50 million per year.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Rancho Santa Fe Road Widening Project, Carlsbad, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Gallegos provided resident engineer services during construction of the realigning of Rancho Santa Fe Road in Carlsbad. This project included the realigning of a 2.2-mile section of Rancho Santa Fe Road, beginning at La Costa Avenue to the east and constructing a six-lane roadway to the north. b.
(1) TITLE AND LOCATION (City and State)
Water Pipeline Extension for Medium Security Detention Facility, County of Imperial
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Gallegos provided construction management services during installation of over 5,000 LF of 12” C- 900 PVC waterline.

The project was a joint venture between the City of El Centro and the County of Imperial to provide fire flow and additional capacity serving the County’s new medium-security detention center and sheriff station. c.
(1) TITLE AND LOCATION (City and State)
Dogwood Avenue Improvements Project State Street to Interstate 8, El Centro, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Gallegos was the construction manager on this project. He coordinated daily with Caltrans District 11 personnel and provided all project documentation in accordance with the Caltrans Local Assistance Procedures Manual. The project was funded by the American Recovery and Reinvestment Act (ARRA) and Prop 1B. The project included removal of the existing road and replacement with new base, geofabric, geogrid, and asphalt. In addition, all curb returns were removed and replaced to comply with ADA requirements.
d.
(1) TITLE AND LOCATION (City and State)
Newport Road Widening, Menifee, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm CM for this project that included removal and construction of landscaped median, sidewalk, curb and gutter. Installed new traffic signals, modified existing traffic signals, installed striping and loops. Installed new irrigation conduits and appurtenances, relocate existing irrigation appurtenances, and restore parkway landscaping. Install and remove traffic control components which include temporary asphalt, custom signs, temporary traffic signal detection cameras, paint. e.
(1) TITLE AND LOCATION (City and State)
Water Pipeline Extension for Medium Security Detention Facility, County of Imperial, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Gallegos provided construction management services during installation of over 5,000 LF of 12” C- 900 PVC waterline.

The project was a joint venture between the City of El Centro and the County of Imperial to provide fire flow and additional capacity serving the County’s new medium-security detention center and sheriff station.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Ryan Ruiz, PE

13. ROLE IN THIS CONTRACT
Construction Manager

14. YEARS EXPERIENCE
a. TOTAL
12 b. WITH CURRENT FIRM
9 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
B.S., Structural Engineering

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Civil Engineer No. C86394
CESSWI
Qualified SWPPP Practitioner (QSP)
ITCP; PACP; MACP

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Ruiz has experience as a construction manager, inspector, office engineer and field engineer. Projects have included wastewater treatment facilities, above ground tank reservoirs, pump stations, police stations, wetlands, and park and street improvements.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Central City Park Project, Fontana, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ruiz is currently working as the Construction Manager for the Central City Park project. This project includes the installation of (1) lighted soccer field and (2) lighted soccer/football fields with artificial turf, a tot lot, picnic areas, restroom and snack bar facility, (2) new parking lots, storage building, horse shoe facility and pits, community garden area, mechanical and electrical improvements, and a new six-foot high anti-graffiti wall along the northern border of the park property. b.
(1) TITLE AND LOCATION (City and State)
Coast Highway Intersections Improvements, Laguna Beach, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ruiz worked as the Construction Manager for the City of Laguna Beach. Project work included traffic signal infrastructure and hardware, signing and striping modifications along the project corridor, and Coast Highway civil design improvements including installation of ADA ramps and landings, curbs, gutters, street restoration, traffic signal loops, traffic poles, and brick pavers per City, CALTRANS and ADA requirements and project specifications. c.
(1) TITLE AND LOCATION (City and State)
Miller Park Amphitheater Project, Fontana, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ruiz was Construction Manager. The project includes the construction of a restroom building, bandstand and stage, stairs, ramps, concrete paving, concrete walls, hand rails, electrical fixtures, conduit and wiring, landscape planting and irrigation, landscape drainage systems, drinking fountain, water feature splash pad, surge tank and water lines and appurtenances, sewer lines and appurtenances, and storm drain lines and appurtenances. d.
(1) TITLE AND LOCATION (City and State)
Carlsbad Desalination Pipeline Project, Carlsbad, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ruiz worked as a Field Engineer and Consultant City Inspector for the City of San Marcos. Mr. Ruiz inspected all work by the contractor within the city to ensure plan and specifications were correctly met. Responsible for ensuring quality assurance and safety was implemented during over 2,640 feet of 55” water pipeline installation throughout the city of San Marcos. Responsibilities included project restoration of ADA sidewalks and ramp ways, catch basins and curbs, property damage, dealing with resident inquiries as needed, and proper traffic control operations. Responsible for a daily engineer’s report that documents daily observations of field operations. e.
(1) TITLE AND LOCATION (City and State)
Police Station Expansion Project, Fontana, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016-2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ruiz worked as a Field and Office Engineer for the Police Expansion project which included the fabrication of an entirely new east stair tower, HVAC system, simulator room and firing range for the department, locker rooms, conference rooms, offices, weight room and bathrooms by demolishing and reconstruction of the entire basement and east stair tower.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Garrett White, QSP

13. ROLE IN THIS CONTRACT
Construction Inspector

14. YEARS EXPERIENCE
a. TOTAL
30 b. WITH CURRENT FIRM
18 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
Palomar College Courses
Public Works Inspection I
Water Distribution I
Water Treatment I

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Pipeline Assessment Certification Program (PACP); ACI
Concrete Field Testing Technician Grade I; ACI Concrete Repair Basics; SWPPP Certification; OSHA 10-Hour
Confined-Space Safety and Training Certification;
NASSCO training/ certifications:; Cured-in-Place Pipe
(ITCP) Inspection Certification

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Garrett White has 30 years’ experience in the rapidly changing construction industry with an emphasis in the construction of water, wastewater, and storm drain facilities for public agencies. He has been involved with the construction of large- and smalldiameter pipelines, treatment plants; pump stations for potable and non-potable distribution systems, horizontal directional drilling (HDD), with an emphasis in trenchless technologies.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
V1: West Vista Way Sewer Phase 1, Vista, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. White provided full-time construction and storm water inspections, coordination of geotechnical inspections and adherence to the contract documents for the City of Vista for the 18-month duration of this project. The work generally consisted of installation of 4,250 LF of deep cut sewer, micro tunnel boring, bypass pumping, and pavement restoration. b.
(1) TITLE AND LOCATION (City and State)
20-Inch Effluent Pipeline, Ramona Municipal Water District, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. White performed construction inspection and storm water inspections throughout the duration of this project. The work for this project consisted of: construction of approximately 20,000 LF of 20-inch diameter HDPE IPS DR-17 butt fusion welded pipe, connections to the existing yard piping for the secondary effluent clarifiers at the Santa Maria Treatment plant to Pond Site #1; installation of approximately 1,000 LF of 20-inch IPS DR-17 HDPE within a 30-inch diameter steel casing via trenchless jack and bore method at five separate locations; installation of blow off assemblies, combination air valve assemblies, pre-cast maintenance structures and construction of a new flow meter vault at the Santa Marie WWTP. c.
(1) TITLE AND LOCATION (City and State)
Sewer Water and Arterial Paving (SWAP) Capitol Project, City of Del Mar, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. White served as the lead inspector in charge of several Level I Inspectors for multiple projects performed at the same time. All work for the multiple projects needed to be completed prior to the yearly opening of the World Famous Del Mar Fair. d.
(1) TITLE AND LOCATION (City and State)
Home Plant Lift Station and Force Main Replacement, Carlsbad, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Inspector for a new HLPS consists of a submersible lift station with a PVC lined wet well, bubbler level control, odor control bed, new emergency generator, emergency storage structure, influent sewer piping and manholes, flow meter and valve/camlock vaults, new controls and electrical panel located in the control building, new site fencing, new and restored landscaping, recycled irrigation, asphalt paving and 1,900 LF of 8-inch HDPE force main. e.
(1) TITLE AND LOCATION (City and State)
Job Order Contract Program, County of San Diego, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Various
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. White worked as project inspector on numerous projects included in the County of San Diego Capital Improvement Asphalt Paving Projects including: Balboa Park, San Diego Zoo and Museum parking lot rehabilitation projects, Morely Field parking lot pavement rehabilitation, City Hall parking and surrounding roads rehabilitation projects.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Al Olea

13. ROLE IN THIS CONTRACT
Construction Inspector

14. YEARS EXPERIENCE
a. TOTAL
32 b. WITH CURRENT FIRM
15 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
BA, Business Management

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Hazmat Certified CFR-49, ICBO – Certified Building
Inspector

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Al Olea has more than 25 years’ experience as a construction project manager, inspector, and supervisor for residential, commercial, and public works projects. He has completed inspection of a variety of public works projects, including roadways, pipelines, pump stations, treatment plant projects, and administration buildings. His construction background includes scheduling and supervising up to 150 employees, cost estimating, preparing construction proposals, obtaining building permits, and managing construction sites.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
As-Needed Inspection Services, City of Huntington Beach, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Olea is currently providing inspection services on a variety of utility projects for the City. As utility companies pull encroachment permits, Mr. Olea inspects the work in City right-of-way for compliance with permit requirements. Inspection includes traffic control, safety, backfill, compaction, and return of ROW to existing conditions. b.
(1) TITLE AND LOCATION (City and State)
Dogwood/Interstate 8 Freeway Ramp Widening and Signalization Project, El Centro, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Olea provided roadway inspection services on the City’s Dogwood Road expansion project that includes widening of four ramps, grading, curb, gutter, sidewalk, new signalization, landscaping, and new road sections. This was a Caltrans project that was being administered by the City. As such, Mr. Olea coordinated daily with Caltrans District 11 personnel and provided all project documentation in accordance with the Caltrans Local Assistance Procedures Manual. c.
(1) TITLE AND LOCATION (City and State)
Senior Community Center, Fontana, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2010-2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Olea performed full-time quality control and quality assurance inspection for this 43,000-square-foot facility starting with the on-site grading, over-excavation and re-compaction of the building pad, through to completion of the project. Quality assurance oversight and coordination also included upgrading and tie-in to the City water and sewer systems.

Responsibilities included the coordination of third-party material testing and inspections, as well as daily coordination with the general contractor and numerous subcontractors.
d.
(1) TITLE AND LOCATION (City and State)
City of Coachella Pump Station and Pipeline Project, Coachella, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm As an Inspector for the pump station and pipeline project, Mr. Olea’s duties included inspecting all structural, electrical, mechanical, pipelines and plumbing, as well as installation of base, asphalt, and petromat overlay and landscape installation.

He was the lead inspector for this $8 million project, which was taken over by the contractor’s bonding company because the contractor defaulted on the original contract.
e.
(1) TITLE AND LOCATION (City and State)
Street Rehabilitation Phase 1 & 2, Coachella, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Olea provided inspection services for pavement rehabilitation and reconstruction at various locations. Rehabilitation methods included overlay, heater remix, removal and replacement of existing curb and cutter, sidewalks, cross-gutters, and driveways.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
John Przybyszewski

13. ROLE IN THIS CONTRACT
Construction Inspection

14. YEARS EXPERIENCE
a. TOTAL
42 b. WITH CURRENT FIRM
14 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
AA Turfgrass Management

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) South Coast Air Quality Management District Fugitive Dust Control Certificate

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) John Przybyszewski has over 40 years’ experience in construction management, park, and golf course construction, and country club management, including capital improvements and remodels, project management and quality control, maintenance and irrigation programs, grading, plan review, documentation and contract administration, bid evaluation, regulatory compliance, budget design and administration, owner/designer liaison.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
As-Needed Inspection Services, City of Huntington Beach, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2010-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Przybyszewski is currently providing inspection support on a variety of CIP projects for the City. Projects completed include: Trinidad Pump Station, Well #5, Sewer Slip Lining, Angler/Palisade Tree Partition, and Zone 8 Residential Overlay. b.
(1) TITLE AND LOCATION (City and State)
Warner Ave. Sewer Pump Station, Gravity and Forcemain Pipeline Project, Huntington Beach, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Przybyszewski is currently providing construction management and daily inspection during installation of two new sewer pump stations and over a mile of gravity and forcemain PVC sewer pipelines for the City of Huntington Beach. The project is being construction in the City’s public streets and right-of-way, including sections in Pacific Coast Highway (PCH). John coordinates daily with Caltrans for traffic control requirements on PCH, and with the surrounding residents. c.
(1) TITLE AND LOCATION (City and State)
Recycled Water System Expansion, San Clemente, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Przybyszewski provided construction management services that included the observation and daily inspection for the installation of the San Clemente Recycled Water System Expansion Project , consisting of the installation of: 30,040 Ln. Ft.

Class 200 PVC AWWA C900 pipelines of various diameters 6’, 8”, 12”; 5,965 Ln. Ft. Class 350 D.I. pipeline of various diameters 6”, 16”, 20”; 2,030 Ln. Ft. Fusible 16” PVC C905 Slip lining in host 20” pipe installing services; 75 - 2” Water Services; Cathodic Protection System; Pressure Reducing Station. d.
(1) TITLE AND LOCATION (City and State)
The Crossings at Carlsbad, Carlsbad, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm As resident engineer, performed as owner’s representative, interfacing with golf course and site improvement contractors during construction of a 18-hole Championship Greg Nash design golf course with $30 million budget for the City. e.
(1) TITLE AND LOCATION (City and State)
Big League Dreams Sports Complex, West Covina, California (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm As Project Manager, Mr. Przybyszewski performed as owner’s representative, interfacing with site improvement contractors during construction of 6 replica baseball fields, which included Angel Stadium, Dodger Stadium, Fenway Park, Tiger Stadium, Wrigley Stadium, and Yankee Stadium. The $34 million project also included construction of 23,000 square feet covered special use pavilion, two children’s playgrounds, nine station batting cage, two sports theme full service restaurants, 3,000 sq. ft. maintenance building, and installation of the irrigation system and site landscape material.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Bradley Voorhees

13. ROLE IN THIS CONTRACT
Construction Inspector

14. YEARS EXPERIENCE
a. TOTAL
34 b. WITH CURRENT FIRM
4 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization)
Palomar College, San Marcos
Water Technology Education Program

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) DHS Water Distribution Grade 4
CWEA Wastewater Collection Grade 4
DHS Water Treatment Grade 2
ATSSA Traffic Control Supervisor

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Bradley Voorhees has nearly 35 years of experience in construction supervision and inspection of municipal projects specializing in water, wastewater and recycled water projects. Mr. Voorhees served in a supervising capacity for the City of Poway for over 30 years overseeing planning, construction and inspection of various water and sewer projects. Duties included development review, plan check, safety compliance, inspection, and training and supervision of over 20 employees.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
As-Needed Inspector, City of Del Mar, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Since 2016, Mr. Voorhees has provided inspection services for a variety of CIP projects for the City. As the inspector, Mr.

Voorhees was responsible for the day-to-day quality assurance inspection of the work, inspecting traffic control and public outreach. To date, projects have included sidewalk Repairs, paving projects, water line replacements, multi-use pathways, storm drains, and sewer projects.
b.
(1) TITLE AND LOCATION (City and State)
North Shore Community Park, Desert Recreation District, Indio, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Voorhees served as inspector for this $3.5 million park that includes the following park elements: mass grading, soccer fields, basketball court, skate park, restroom building (by Romtec), water feature, walking paths, exercise equipment mounds, irrigation, planting, landscape, Musco lighting, and road improvements. c.
(1) TITLE AND LOCATION (City and State)
Annual Sewer Rehabilitation Project, San Juan Capistrano, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Voorhees provided inspection services for the rehabilitation of approximately 9,000 LF of small diameter sanitary sewer at various locations throughout Historic San Juan Capistrano, including relining of 5,000 LF of 21” large diameter trunk sewer, located within the Orange County Flood Control Districts environmentally sensitive Trabuco Creek channel, by means of Cured in Place Pipe (CIPP).
d.
(1) TITLE AND LOCATION (City and State)
As-Needed Inspector Sewer and Water Projects, Ramona Municipal Water District, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2017-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Since 2017, Mr. Voorhees has provided inspection services for a variety of CIP and developer projects for the Ramona Municipal Water District.
e.
(1) TITLE AND LOCATION (City and State)
Water Collection Supervisor, City of Poway, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Various
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Mr. Voorhees served as water collection supervisor for the City overseeing operations and maintenance of wastewater collection and recycled water systems. Facilities in included 170 miles of sewer collection system, 11,000 laterals, 5 lift stations, 12 miles of force main, and 10 miles of recycled water systems.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Tom Ramirez

13. ROLE IN THIS CONTRACT
Construction Inspector

14. YEARS EXPERIENCE
a. TOTAL
35 b. WITH CURRENT FIRM
5 15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas, CA)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Ramirez has over 35 years of experience in construction providing construction management and field inspection services on public works and private development projects. Experience includes water, sewer, storm drain, and pipeline construction; wastewater treatment plants; roadway construction; bridge retrofits; and new construction, repairs and remodels of public buildings and residential developments. Experience includes preconstruction, constructability and plan reviews; survey staking; SWPPP; and traffic control.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Railroad Canyon Water Reclamation Facility Yard Piping
Modifications, City of Lake Elsinore, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ramirez served as project manager/lead inspector for the District on this project that included the remodel of two (2) aeration basins with HDPE Baffle curtains, concrete support structures, and submersible mixer pumps. Yard piping included 2,750 LF of 12” RW pipe C-900 pipe with appurtenances, 150 LF 14” DR piping, HDPE liner and concrete stairs for two (2) RW holding ponds, 3 outlet structures, 1,440 LF of 4” W3 wash down piping with wharf hydrants, wire perimeter fence with gates around the RW ponds, and control room upgrades.
b.
(1) TITLE AND LOCATION (City and State)
Police Station Rehabilitation Project, City of Hemet, CA (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ramirez served as project manager/lead inspector for this project. The project included: demolition, asbestos and lead remediation, office space, restroom and jail facilities reconstruction/remodel, epoxy/stain floors and walls, framing, drywall, tile, Armortex bullet proof walls, concrete walks and stairs. . c.
(1) TITLE AND LOCATION (City and State)
Central City Park, City of Fontana, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ramirez was project manager/lead Inspector for this new park project. The new park includes three (3) lighted soccer/football fields with artificial turf, concession and restroom building, storage building, 20,000 SF underground stormwater chamber system, playground, A Horseshoe Club, a community garden, picnic area, and two (2) parking lots. d.
(1) TITLE AND LOCATION (City and State)
Lead Inspector, City of San Marcos, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015-2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ramirez was lead inspector on various City CIP projects including: street widening, signals, storm drains, utilities and surface improvements. The Creekside Marketplace project included grading and parking lot improvements, utilities, storm drains, curbs, sidewalks, planters, 25’ BTH palm trees, asphalt and striping. e.
(1) TITLE AND LOCATION (City and State)
Street Rehabilitation Programs, Phases 2 and 3, City of Coachella, CA
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Ramirez was lead inspector. The project included: removal and replacement of damaged curb and gutter, sidewalk, driveways, cross gutters, spandrels and street grinding, replacement of asphalt concrete with AR4000 base course and AHRM Surface course.

STANDARD FORM 330 (REV. 8/2016) PAGE 2
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Justin Scheidel, PE Engineering Support a. TOTAL 17 b. WITH CURRENT FIRM 10

15. FIRM NAME AND LOCATION (City and State)
Dudek (Encinitas California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) MS Civil Engineering
BS Civil Engineering
CA, Professional Engineer, 82058

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Justin Scheidel is a project engineer with 13 years of experience specializing in water infrastructure design, wastewater treatment design, and construction management. He is responsible for detailed design and layout, civil/mechanical calculations and analysis, equipment selection, cost estimation, and development of plans and specifications. Mr. Scheidel is experienced in all phases of engineering, including planning, design, and construction.

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Joshua Basin Water Recharge Project
Joshua Tree, California
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
NA 2014
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Construction Engineer and Project Manager for the 4.5-mile raw water transmission line connecting the Mojave Water Authority raw water aqueduct in Yucca Valley California to the newly constructed percolation ponds in Joshua Tree California. This project is intended to provide the Joshua Tree basin with a clean sustainable water source to recharge the areas ground water supply.

Managed contract administration, provided onsite inspection, and engineering for the $4.5M project. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED As Needed Engineering Services
Joshua Tree, California
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Ongoing Ongoing
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Project engineer assisting with construction inspection, coordination, plan checking, and engineering design services when required.

This included various capital improvements projects vital for continuing water supply and the institution of emergency water supply alternatives.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED As Needed Engineering Services
Ramona, California
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Ongoing Ongoing
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Project Engineering assisting with construction inspection, coordination, plan checking, and engineering design services when required.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Simsbury Sewer Extension, Lift Station Abandonment Study and Design, Carlsbad, California
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2014 2017
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Development of an adjoining lot prompted the evaluation of potential re-alignment of the existing sewer and abandonment of the existing pump station, creating a complete gravity sewer system. The preliminary evaluation of the project determined that the conversion was feasible by re-directing the sewer through the development. Drastic changes in elevations between the two sites prompted installation of the connection piping through the trenchless jack and bore method. Completion of the project eliminated the need for a pump station reducing energy and maintenance costs. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coast Pump Station and Force Main Rehabilitation
Encinitas, California
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2015 2017
(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm.

Lead Engineer for the structrural rehabilitation of the existing wetwell submersible pump station, new valve vault, and installation of a 2-barrel 100% redundant 800 ft 4” forcemain under a lagoon and railroad tracks by horizontal directional drilling. The use of trenchless methods substantially reduced environmental issues, shortening the project design/permitting period and construction costs.

ARCHITECT ENGINEER QUALIFICATIONS

1. SOLICITATION NUMBER (If any)
On-Call CM, Engineering Support,
Testing and Inspection Services

PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME
Dudek

3. YEAR ESTABLISHED
1980

4. UNIQUE ENTITY IDENTIFIER
02-487-1675
2b. STREET
605 Third Street

5. OWNERSHIP
a. TYPE
2c. CITY Corporation
Encinitas
2d. STATE
CA
2e. ZIP CODE
92024 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE N/A
George Litzinger, PE / Principal, CM Division Manager 7. NAME OF FIRM (If Block 2a is a Branch Office) 6b. TELEPHONE NUMBER N/A
619.980.7048
6c. E-MAIL ADDRESS
[email protected]
8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY

IDENTIFIER

N/A N/A N/A

9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function
Code b. Discipline
c. No. of Employees a. Profile
Code b. Experience
c. Revenue Index
Number
(see below) (1) FIRM (2) BRANCH
02 Administrative 76 66 A02 UAS Services 3
05 Archaeologist 130 44 C14 Biological 5
07 Biologist 85 27 C15 Construction Mgt 4
12 Civil Engineer 59 35 C16 Compliance 5
16 Construction Manager 10 E01 Cultural 3
24 Enviro Scientist 54 14 E09 CEQA / NEPA 4
29 GIS Specialist 33 9 E09 Enviro Tech Group 1
34 Hydrologist 27 18 E11 Restoration 3
39 Landscape Architect 15 11 F06 Urban Forestry 3
47 Planner 22 4 G04 GIS 1
48 Project Manager 84 19 P05 Plan / Urban 3
58 Technical/Analyst 19 4 W02 Hydrogeology 4
W03 Water Infrastructure 5
Total Other Employees 614 251

11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM FOR LAST 3
YEARS
(Insert revenue index number shown at
right)
a. Federal Work 9 PROFESSIONAL SERVICES REVENUE INDEX NUMBER

1. Less than $100,000. 6. $2 million to less than $5 million

2. $100,000 to less than $250,000 7. $5 million to less than $10 million

3. $250,000 to less than $500,000 8. $10 million to less than $25 million

4. $500,000 to less than $1 million 9. $25 million to less than $50 million

5. $1 million to less than $2 million 10. $50 million or greater b. Non-Federal Work 3
c. Total Work 9

12. AUTHORIZED

REPRESENTATIVE
The foregoing is a
statement of facts.
a. SIGNATURE
. NAME AND TITLE
George Litzinger, Construction Management Division Manager b. DATE
5/1/22
800.450.1818 | [email protected]
DUDEK.COM

CITY OF CYPRESS
Public Works Department
PROPOSAL (RFP # PW-006-22)

ON-CALL CONSTRUCTION MANAGEMENT/

ENGINEERING SUPPORT/ TESTING AND

INSPECTION SERVICES
MAY 05, 2022
City of Cypress
On-Call CM/Engineering Support/Testing and Inspection Services 1 Table of Contents
COVER LETTER ............................................................................................................................................................. 2 FIRMS QUALIFICATIONS ........................................................................................................................................... 4 FIRM REPRESENTATIVE REFERENCES.......................................................................................................................... 4 KEY PERSONNEL MATRIX / CREDENTIALS..................................................................................................................5 STAFFING AND RESOURCES MANAGEMENT PLAN.................................................................................................. 6 PART I ........................................................................................................................................................................... 8 SECTION A, B, C_ ARCHITECT-ENGINEER QUALIFICATIONS...................................................................................... 8 SECTION D_ ORGANIZATIONAL CHART..................................................................................................................... 9 SECTION E_KEY PERSONNEL RESUMES...................................................................................................................10 SECTION F_ EXAMPLE PROJECTS .............................................................................................................................32 SECTION G_KEY PERSONNEL EXAMPLE PROJECT ....................................................................................................41 PART II........................................................................................................................................................................ 46 ARCHITECT-ENGINEER QUALIFICATIONS ................................................................................................................46 On-Call Construction Management /
Engineering Support / Testing and
Inspection Services
SECTION H & I_ADDITIONAL INFORMATION............................................................................................................42 City of Cypress
On-Call CM/Engineering Support/Testing and Inspection Services 2 COVER LETTER
May 5, 2022
City of Cypress
Public Works Department
5275 Orange Avenue
Cypress, CA 90630
Attention: Nick Mangkalakiri, Assistant City Engineer
Re: On-Call Construction Management/Engineering Support/Testing and Inspection Services
Dear Mr. Nick Mangkalakiri:

FALCON Engineering Services, Inc. (FALCON) proudly present our proposal to the City Cypress for the On-Call Construction Management/Engineering Support/Testing and Inspection Services. FALCON is a certified Small Business Enterprise (SBE) incorporated in California. FALCON specializes in Construction Management (CM) and Inspection, Constructability Reviews, Construction Administration, Labor Compliance, Project Closeout for Transportation and Public Works Projects for various Cities, Counties, and several Caltrans Districts.

FALCON has provided services for several "On-Call" management/inspection contracts; these include major public works/ capital improvement projects, freeway/bridge construction, interchanges, grade separations, new ramps/ramp realignment/widening, street improvements, pavement rehabilitation/improvements, signalized intersections, ADA compliant ramps & sidewalks, landscaping, drainage systems, major channel/ flood control construction, sewage systems, water systems, utilities, building inspection, land development and capital projects. Many of our projects were constructed with Federal/State/Local Funding, using Caltrans Local Assistance Procedures Manual (LAPM), as well as all applicable City and Caltrans standard practices, regulations, policies, procedures, manuals and standards (Greenbook, Caltrans, etc.), as well as Federal Highway Administration (FHWA).

The Technical and Administrative personnel we are proposing have tremendous experience working on similar On-Call contracts throughout California "Cities, Counties, and Caltrans." With a comprehensive understanding of this program and potential resource needs, our vision in developing a team for this assignment has been to have the "best-qualified" staff with the most relevant experience. The FALCON Team is highly committed to providing the highest level of service in the most cost-effective manner possible. Our team offers an unparallel resource pool of experts to meet the project needs and a flexible organization to adjust to the project workload rapidly.

We are proud to be partnering with the following firms.

RMA Group, Inc.
1210 East 223rd St., Suite 319
Carson, CA 90745
RMA Group's geotechnical and geologic design services include preliminary geotechnical investigations, foundation studies, fault investigations, liquefaction analysis, Phase 1 environmental site assessments, and geotechnical and geologic review of grading and foundation plans. Established in 1962, it is a California corporation with professional offices and laboratory facilities within California. RMA Group's staff includes registered civil and geotechnical engineers, registered geologists and certified engineering geologists who provide our firm with comprehensive geotechnical and environmental capabilities.

Francis Consulting
9312 Tritt Circle, Villa Park
CA 92861 (DBE/WBE/MBE)
Francis Consulting has 14+ years of professional experience in Architectural Services, Interior Design Services, Planning and Design through Construction Documents. Many of our staff members are qualified in engineering, environmental protection efforts, stormwater quality, LEED, architecture, and inspections. Linda Francis, President of Francis Consulting, is an Architect and LEED AP who has worked in the Los Angeles area for over 31 years. She has completed many successful community, commercial, residential, and parking facilities.

FALCON is proud of our reputation
for having seasoned construction
management personnel and of the
industry’s recognition of our ability to
deliver complex freeway
improvement projects ahead-ofschedule, under budget, without claims, and with outstanding customer
service for the local community.
▪ NO LEARNING CURVE
▪ SEASONED INSPECTION STAFF
▪ TEAM WORKERS
Contact Information:

FALCON Engineering Services
1020 Aquino Circle
Corona, CA 92879
(951) 549-9600 Office
Authorized to bind firm:

Maha Faqih, President
(951) 768-9419 Cell
[email protected]
Primary Contact:

Kurt Pegg, PE
Project Manager
(951) 500-7979
[email protected]
City of Cypress
On-Call CM/Engineering Support/Testing and Inspection Services 3 See the partial list below of some of FALCON's relevant projects.

All completed within budget, ahead of schedule, minimal claims, and Fully Reimbursed.

We will provide the City with the most experienced and motivated team that will produce the highest quality work and will become part of the City team in every aspect. Our Project Manager, Kurt Pegg, PE, will develop the tasks to be accomplished, assist in bid review and project scheduling, and assign staff duties to the appropriate members with the City's concurrence.

Part I and Part II of the Caltrans Standard Form 330 will follow as part of the qualifications following the Firm Organization, Credentials, Background and Experience per the RFP.

FALCON will provide the requested inspection staff within 24-hours of the requested assignment and make them available on a part-time/full-time basis (depending on the City's needs).

I, Maha Faqih, PE, am an officer of the firm and authorized to bind the firm to the terms of the proposal. By signing this letter of transmittal, I am attesting that all information in this proposal is true and correct.

The City can count on the FALCON Team to deliver the best-qualified Construction Manager and Inspectors who can handle various tasks. We are excited about this opportunity to continue to serve and expand our Construction Management and Inspection Services to the City of Cypress and believe we are uniquely qualified and committed to the success of this On-call contract.

Sincerely,
FALCON Engineering Services, Inc.

Maha Faqih, PE
President
1020 Aquino Circle│ Corona, CA 92879
Tel: (951) 768-9419 │Email: [email protected]
Over the last 14 years FALCON Team has completed similar construction projects all funded with Federal/State/Local monies and in compliance with Caltrans (CT) Local Assistance Procedures Manual (LAPM), CT Filing System, and Procedures.
- Hamner Avenue Bridge (RCTD) “Ongoing” FALCON-Prime
- I-10/Citrus & Cherry Interchange Improvement (SBCTA) FALCON-Prime - I-15/Limonite Avenue Interchange (RCTD) FALCON-Prime
- Magnolia Avenue Grade Separation (RCTD) FALCON-Prime
- SR-60/Truck Climbing Lane (RCTC) FALCON-Prime
- SR-91 Corridor Operations (RCTC) FALCON-Prime
- I-15/SR-79 South Interchange (City of Temecula) FALCON - Prime - I-215/Van Buren Interchange Improvement (Riverside County) FALCON-Prime - SR-91/Van Buren Interchange Improvement (City of Riverside) FALCON-Prime - SR-60/Nason Street Interchange Improvement (City of Moreno Valley) FALCON - Riverside County On-Call Contract -Prime
- San Bernardino County On-Call Contract -Prime
- Los Angeles County On-Call Contract -Prime
- City of Temecula On-Call Contract -Prime
- City of Moreno Valley On-Call Contract -Prime
- City of Corona On-Call Contract [Sierra Bella] -Prime - Caltrans On-Call Contracts District 1,2,3, 5, 6, 7, 8, 12 and 59-(Subconsultant) Our Construction Management
team excels in accommodating
all stakeholders while
maintaining work progress,
safety and access for the various
businesses and residents.

Part 1 ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services

ARCHITECT-ENGINEER QUALIFICATIONS

PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION

1. TITLE AND LOCATION (City and State)
City of Cypress, CA - On-Call Construction Management/Engineering Support/Testing and Inspection Services

2. PUBLIC NOTICE DATE 3. SOLITICATION OR PROJECT NUMBER April 14, 2022 PW-006-22
B. ARCHITECT-ENGINEER POINT OF CONTACT

4. NAME AND TITLE
Maha Faqih, President

5. NAME OF FIRM
FALCON Engineering Services, Inc.

6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
951-549-9600 N/A [email protected]
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.) (Check)

9. FIRM NAME 10. ADDRESS 11. ROLE IN CONTRACT
PRIMEJ-V PartnerSubcontractor
a.

FALCON Engineering Services

CHECK IF BRANCH OFFICE
1020 Aquino Circle,
Corona, CA 92879
Project Manager, Construction
Manager/Resident Engineer, Asst.

Resident Engineer, Inspection, QA/QC,
Labor Compliance Office Engineer,
Scheduler (Prime)
b. RMA Group. Inc.

CHECK IF BRANCH OFFICE
1210 East 223rd Street, Suite
319, Carson, CA 90745
Materials and Laboratory Testing
(Subconsultant)
c.

Francis Consulting

CHECK IF BRANCH OFFICE
9312 Tritt Circle
Villa Park, CA 92861
Architectural Inspection Support
(Subconsultant)
d.

CHECK IF BRANCH OFFICE
e.

CHECK IF BRANCH OFFICE
f.

CHECK IF BRANCH OFFICE
g.

CHECK IF BRANCH OFFICE
h.

CHECK IF BRANCH OFFICE
i.

CHECK IF BRANCH OFFICE
j. CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
Section A, B, C Architect-Engineer Qualifications
Pg.8
Section D: Organizational Chart ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services SECTION D: ORGANIZATIONAL CHART

CITY OF CYPRESS
Principal-in-Charge
Maha Faqih, PE 1
Project Manager
Kurt Pegg, PE, QSD/P 1

ENGINEERING SUPPORT
Value Engineering
Ashraf Mohamed, PE 1 *
Tariq Malik, PE, CCM, QSD/P 1*
Juan Rojas, PE, QSD/P 1 *
Majid Afanan, PE, QSD/P 1 *
Cost Estimating
Kurt Pegg, PE, QSD/P 1*
Moh’d Khalaileh, PE, QSD/P 1*
Constructability Review
Tariq Malik, PE, CCM, QSD/P 1*
Office Engineer/Administration
Rhonda Abouazra 1
Sarah Alina 1
Anthony Montoya 1
Architectural
Linda Francis 3
Charles Lamb, RLA 3
Surveying
Bill Henry, PLS 1*
CAD Drafting/GIS Support
Ahmad Shalaldeh, EIT 1*
Mark Jardiolin 1*
Syed Afzal Biyabani 1*
Pavement Management Support
Majid Afanan, PE, QSD/P 1 *
Tariq Malik, PE, CCM, QSD/P 1 *
Zaid Afanan, PE, QSD/P 1 *
Ahmad Shalaldeh, EIT 1*
Dennis Parker 1 *
Crosby Rodriguez 1
Awwad Kaddah 1*

TESTING AND INSPECTION
Construction Inspector /
Asst. Resident Engineer
Moh’d Khalaileh, PE, QSD/P 1 *
Zaid Afanan, PE, QSD/P 1 *
Ahmad Faqih, PE, QSD/P 1*
Alex Naime, PE, QSD/P 1*
Salvador Orozco 1 *
Dennis Parker 1
Crosby Rodriguez 1
Awwad Kaddah 1*
Ahmad Shalaldeh, EIT 1*
Mark Jardiolin 1*
Syed Afzal Biyabani 1*
Tim Dexter 1
Alhakem Alina, PE 1
Ahmed Hamasha 1
Yazan Alfaqih 1
Mostafa Bayoumi 1
Bill Henry, PLS 1 *
Maliha Malik 1
Nick Smith 1
Attef Naime 1
Walid Sudqi 1
Anthony Montoya 1 *
(All names above will be available for
emergency inspections and night work)
Electrical/Signal Inspector
Salvador Orozco 1 *
Material & Laboratory Testing
Johnny Rodriguez, PE 4 *
Mike Couture 4 *
David Pereya 4 *
Brandon Buffalo 4 *
Michael Baca 4 *
Adrian Lopez 4 *
Geotechnical / Exploratory
Investigation
Johnny Rodriguez, PE 4 *
Mike Couture 4 *
David Pereya 4 *
Brandon Buffalo 4 *
Michael Baca 4 *
Adrian Lopez 4 *
Underground Utility Research
Majid Afanan, PE, QSD/P 1 *
GPS Site Photography
Sami Faqih 1
Kevin Mindreau 1
Key Staff identified will not be changed prior to commencement of work without the City’s approval and two weeks’ notice.

Replacement of candidates will be at same or higher level of similar experience as the original project team member.

LEGEND
Key Personnel
* Multiple Roles
1 FALCON
2 RMA
3 Francis

CONSTRUCTION MANAGEMENT
Construction Managers / Resident Engineers
(all CM’s are Key Personnel)
Ashraf Mohamed, PE 1
Tariq Malik, PE, CCM, QSD/P 1
Juan Rojas, PE, QSD/P 1
Majid Afanan, PE, QSD/P 1
Ahmad Faqih, PE, QSD/P 1
Moh’d Khalaileh, PE, QSD/P 1
Zaid Afanan, PE, QSD/P 1
Ayman Abdelbari, PE, PMP 1
Alex Naime, PE, QSD/P 1
Project Scheduler
Ayman Abdelbari, PE, PMP 1 *
Moh’d Khalaileh, PE, QSD/P 1 *
Labor Compliance
Moh’d Khalaileh, PE, QSD/P 1 *
SWPPP / Safety Coordinator
Dion Castro, ToR, QSD/P 1
Utility Coordinator
Majid Afanan, PE, QSD/P 1
Section D - Organizational Chart
Pg.9
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE KURT PEGG, PE, QSD/P Project Manager
Constructability Review/Estimator
a. TOTAL b. WITH CURRENT FIRM
31 6

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.Sc. Civil Engineering University of Calgary, Alberta, Canada, 1990 • Licensed Professional Engineer (Civil) California #C54485 • Safety Trained Supervisor (STS)
• QSD and QSP certification #25607

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | has 31 years of construction experience, serving as project manager and construction manager for heavy civil projects involving underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities. He started his career working for Caltrans in the Bridge Department in both Districts 4 and 12, completing his rotation through Sacramento with an emphasis on cost estimating. Kurt has served as resident engineer, structures representative, construction scheduler, cost estimator, and structure and roadway inspector. He manages and oversees construction administration and management activities of the agency's construction projects, supervises and assigns activities for staff and consultants, and reviews construction progress payments, costs, budgets, and schedules, enforcing contract requirements and negotiating change orders. He is responsible for the overall project operation, including safety. His experience extends to construction administration, including project scheduling, project controls, project management, and partnering and claims resolution, as well as planning, coordinating, and controlling a project from inception to completion to produce a functionally and financially viable project, completing on time and within authorized costs and to the required quality standards.

Training: 30-hour Cal OSHA, Defensive Driver, Harassment Prevention, Temporary Pedestrian, Safety Trained Supervisor (STS), First Aid Training

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC), SR-60/Truck Lanes Project, Cities of Beaumont & Moreno Valley, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the Project performed with the current firm Project Manager/Construction Manager. This project will add an additional lane in both the eastbound and westbound directions of SR-60 from Gillman Springs to Jack Rabbit Trail, through an area typically referred to as the "Badlands." Dedicated truck climbing lanes, truck descending lanes, and new inside and outside shoulder lanes. The Project includes moving approximately 2M CY of excavation, extensive drainage improvements and 108,000 CY ($20M) of new concrete pavement (JPCP). The Project includes the construction of JPCP lanes, drainage systems, concrete barriers, box culverts, wildlife paths, underground utilities, concrete structures, retaining walls, earthwork, storm drains, landscape irrigation, street markings and traffic signs, roadway excavation, grading, paving, trenching, landscape construction and inspection, roadway improvement, installation of temporary and ultimate signals and light systems. Mr. Pegg prepares and updates the project schedule from design through construction, identifies permitting and environmental requirements, assures quality control, reviews design submittals, performs constructability review, reviews design and construction contract amendments, responds to submittals and RFIs, processes CCOs and extra work invoices, processes pay estimates and provides public outreach services. During the pre-construction phase, Mr. Pegg was part of the constructability review team to improve project plans and specifications for biddability and constructability. It changed the structural pavement section, drainage, and overall project safety.

Cost: $96M │Start Date:01/2019 Completed: 04/2022
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Beaumont, State Route 60/Potrero Boulevard Interchange, Beaumont, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if Project performed with the current firm Project Manager/Construction Manager. This is a Federally Funded Project and was subject to Local Agency Guidelines. Mr. Pegg worked closely with the City of Beaumont and Caltrans. The Project extended Potrero Boulevard over the State Route 60 freeway with a new six-lane bridge and new freeway interchange. Work involved improvements connecting a ramp on Western Knolls to Potrero Boulevard north of the freeway and widening the freeway on both the north and south sides. The Project also required underground utility coordination, concrete structures, retaining walls, earthwork, and drainage improvements. This Project was combined with an additional project on the State Route 60 freeway to construct acceleration and deceleration lanes and median barriers in this area. Responsibilities included preparing and updating the project schedule, tracking project milestones, identifying permitting and environmental requirements, working closely with the structure Pg.10
Section E - Key Personnel Resumes
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services representative and design engineer on complex bridge-related issues and overseeing the construction, administration, and management activities; supervising and assigning the activities of staff and consultants, contractors, design engineers, and regulatory agencies, reviewing construction progress payments, costs, budgets, and schedules, processing submittals and RFIs, reviewing extra work invoices, processing pay estimates, assisting in public outreach services, negotiating change orders and enforcing contract requirements. Technical features include cast-in-place (CIP) post-tensioned box, jointed plain concrete pavement (JPCP) paving, numerous utility relocation, traffic control, shoring systems and detour road construction.

Cost: $14M│Start Date: 02/2018 Completed: 6/2019
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Murrieta, Guava Street Bridge Replacement, Murrieta, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016-2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if Project performed with the current firm Project Manager/Construction Manager. This was a Federally Funded Project and was subject to Local Agency Guidelines. Mr. Pegg worked closely with the City of Murrieta and Utility Agencies such as Southern California Edison and Southern California Gas Company to ensure their facilities were adequately and timely installed into the new bridge structure. This Project replaced the existing structurally deficient Washington Avenue Bridge with a new five-span, cast-in-place pre-stressed (CIP/PS) concrete box girder bridge approximately 500 feet upstream and constructed roadway improvements on the Washington Avenue approach and constructed roadway approaches improvement on Guava Street between Adams Street and Washington Avenue. Improvements also included constructing signalized intersection at Adams Street, ADA compliant ramps, sidewalks, street lighting, striping and traffic signing, 40-foot-wide asphalt concrete (AC) paved travel way with 2-foot by 12- foot lanes with an 8-foot shoulder. Responsibilities included managing the project budget and minimizing exposure to risk, conducting progress meetings, coordinating with agencies and utilities, preparing cost estimates and construction specifications, overseeing the construction, administration, and management activities; supervising and assigning the activities of staff and consultants, contractors, design engineers, and regulatory agencies, reviewing construction progress payments, costs, budgets, and schedules; and negotiating change orders and enforcing contract requirements. Cost: $4.8M │Start Date: 10/2016 Completed: 06/2018 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Caltrans District 8: I-10/Jefferson Street Interchange, Indio, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015-2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if Project performed with the current firm Project Manager: The Project involved the construction of two new bridges joined by a closure pour to create a new six-lane overcrossing with bicycle lanes on each side and a sidewalk on the northbound side. The new overcrossing over the I-10 Freeway required all the on and off-ramps to be realigned and upgraded, allowing for increased storage capacity and safer transitions on and off the freeway. New traffic signals were installed at EB and WB on and off-ramp intersections with the newly aligned Jefferson Street. Once traffic was switched to the new Jefferson Street Overcrossing, the existing Jefferson Street Overcrossing, and Indio Blvd. The Overcrossing was demolished and removed. This Project used the new Mass Concrete Specification in the bent footings, columns and bent caps. Type 1 retaining walls and mechanically stabilized earth (MSE) walls were constructed to retain the bridge approaches. Mr. Pegg was responsible for the overall operation of the Project and for completing the project to the owner's satisfaction, consistent with cost, schedule, and contractual requirements. Primary responsibilities included ensuring plans and specifications were aggressively monitored and requirements enforced, managing project risk, cost and schedule, and scheduling and managing the contractors and subcontractors.

Cost: $50M │Start Date: 03/2015 Completed: 08/2017
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Caltrans District 8: SR-91/215/60 Freeway Interchange Project, Riverside, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004-2008
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if Project performed with the current firm Senior Project Manager: This unique Design Sequence Project included roadway widening, structures, retaining and sound walls, extensive drainage improvements, traffic safety improvements, new signals, and unique landscaping features. The Project features included four miles of high-occupancy vehicle (HOV) lanes and widened freeways on I-215, SR-60, and SR-91, new sound walls and retaining walls of various types throughout the Project, major improvements at eight local interchanges, and two sweeping "flyover" connector ramps between the I215/SR-60 and SR-91. A new truck bypass connector leading from the southbound I-215 to the eastbound SR-60 and new bridges at Linden Street, Iowa Avenue, Blaine Street and Box Springs Road widened these arterials over the freeway and improved circulation for the local street system in the City of Riverside. This Project included boring a 40" storm drain underneath the existing 60 Freeway near the University of California Riverside campus. Kurt Pegg was fully responsible for the overall operation of the Project and to complete the Project to the satisfaction of the owner consistent with cost, schedule, and contractual requirements. His primary responsibilities included ensuring plans and specifications were aggressively monitored and requirements enforced; managing project risk; managing cost and schedule; and scheduling and managing contractors and subcontractors.

Cost: $300M │Start Date:03/2004 Completed: 06/2008
Pg.11
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ASHRAF MOHAMED, PE Construction Manager
a. TOTAL b. WITH CURRENT FIRM
35 1

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science in Civil Engineering
University of Alexandria, Egypt – 1982
Registered Professional Engineer/Civil in the State of California (C 53472)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Mr. Mohamed has over 35 years of progressive experience in civil engineering, project management, construction management, contract administration and extensive knowledge of Construction Engineering and Management. Ashraf has thorough experience in providing project and construction management services for heavy civil projects, including underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities. Pioneered the implementation of California Assembly Bill 2098 to provide Independent Quality Assurance and Oversight for the first Design/Built projects in Southern California; SR91Corridor Improvement Project (CIP) Toll Lanes and Route 15 Express Lanes (ELP). Ashraf has completed 150+ projects as Senior Project Manager/Construction Manager, mostly completed on schedule within budget and with minimal claims. Mr. Mohamed’s experience extends to construction administration, including project scheduling, project controls, project management, and partnering and claims resolution, as well as planning, coordinating, and controlling a project from inception to completion to produce a functionally and financially viable project, completing on time and within authorized costs and to the required quality standards. He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards.

Training: 30-hour Cal OSHA, First Aid Training, Defensive Driver, Temporary Pedestrian, Harassment Prevention Training

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC)
SR-91 Corridor Operations Project (COP), Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2020-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Project Manager/Construction Manager: The 91 COP adds a general-purpose (GP) lane approximately 2 miles in length in the WB direction on SR‐91 from Green River Road to SR‐241. This would involve adding approximately 9 feet of outside widening to SR-91 at some locations and restriping in others, widening the County Line Creek Bridge, constructing new retaining walls, reconstructing a portion of Green River Road, as well as paving, trenching, grading, reinforced concrete and concrete structures, underground utilities, storm drain, and replacing overhead signs. Mr. Mohamed is currently preparing and updating project schedules through all phases, tracking project milestones and deliverables, managing project budget, assuring quality control, reviewing submittals and requests for information (RFI), review of extra work invoices and contract change orders, coordinating activities and schedules with other entities involved in the project, including Caltrans Structures and Headquarters, coordination with the design engineer and project manager, preparing project as-built and structure closing documents in accordance with Local Assistance Procedures Manual (LAPM).

Cost: $Various Amount │Start Date: 02/2020 Completed: 04/2022 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR-60 / Moreno Beach Drive Interchange, City of Moreno Valley, CA PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2021-Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Project Manager/Construction Manager: Moreno Beach Interchange consists of the following components: Replacing the existing Overcrossing Bridge, including raising the roadway profile, reconstruction & realignment, adding WB Aux lane, upgrading/adding stormwater drainage and off-site channel, replacing signals at the intersection of EB on/off- ramps and Moreno Beach Drive, adding ramp meters, striping ad traffic signing, concrete structures, street improvements, sidewalk improvements, utility relocations with Moreno Valley Utilities (MVU), Frontier, Southern California Edison (SCE), Eastern Municipal Water District (EMWD), the addition of bike lanes and related work on Moreno Beach Drive, new features including City Standard street lights and decorative bridge lights on Moreno Beach Drive, provisions for highway planting, irrigation, hardscape, and erosion control and National Pollutant Discharge Elimination System (NPDES) compliance for the entire Pg.12
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services interchange. Mr. Mohamed tracks and monitors project milestones and deliverables, manages project budget and minimizes exposure to risk, assures quality control, conducts meetings, performs design submittal review, prepares pay estimates, verifies contract change orders and extra work invoices, and reviews punch lists.

Cost: $25M │Start Date: 06/2021 Completed: Ongoing
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR-83-Euclid Ave, Improvements, CA/ City of Chino Hills-Private development PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Project Manager/Construction Manager: Euclid Ave Improvements project consists of the construction of right-turn lanes, right-in/right-out driveways, full access driveway leading to the proposed Euclid Commerce Center (private development), reconstruction of the existing vegetated drainage channel, upgrading drainage inlets and storm drain pipes, sidewalk, underground utility coordination, Jack-and-bore steel casing across SR-83 and a recycled water main extension to serve the Euclid Commerce Center, street lighting improvements, landscape and irrigation. Mr. Mohamed tracks and monitors project milestones and deliverables, manages project budget, minimizes exposure to risk, assures quality control, conducts meetings, performs design submittal review, prepares pay estimates, verifies contract change orders and extra work invoices, and reviews RFIs and submittals.

Cost: $3M│ Start Date: 07/2021 Completed: 05/2022
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Projects for the California Department of Transportation (Caltrans), CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
1988-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Project Manager/Construction Manager: Mr. Mohamed supervises, delegates, and trains Junior Resident Engineers, Senior Resident Engineers and Oversight Engineers, leading complex engineering work and administering/Oversighting construction contracts. Mr. Mohamed served as project manager/construction manager for eight (8) projects delivered during this period: 2 Major Oversight projects, a $400 Million Design/Built-in Riverside County constructing Express Lanes @ Route 15 sponsored by Riverside County Transportation Commission (RCTC) and a $26 Million project constructing a new Interchange @ SR-60 at Potrero Road sponsored by Beaumont City, three (3) rehabs projects, $8 Million hot mix asphalt (HMA) pavement, $12 Million replace traffic strip, $1.5 Bridge rehab, 3 Emergency projects, $5 Million Slab replacement, $2.5 Bridge repairs, $0.5 Million Box culvert.

Project Manager/Construction Manager (2014-2018): Mr. Mohamed provided project and construction management of all activities on a $1.4 Billion Corridor Improvement Project (CIP), the largest and fastest Design/Built project in Southern California, constructing 18-miles of Toll Lanes @ the SR91. Ashraf successfully helped in completing the project through keen oversight and coordination between the Sponsoring Agency Riverside County Transportation Commission (RCTC) and Caltrans various departments, including R/W acquisitions, utility relocations, permits, Traffic Operations, Traffic Management Center, Oversight Structure Manager, Oversight Electrical Engineer, Oversight Landscape Architecture Engineer, and Maintenance supervisors. He supervised and provided technical leadership to all roadway Independent Quality Assurance (IQA) inspectors assigned to the sponsoring agency, RCTC.

Cost: $Various Amounts│ Start Date:1/1988 Completed: 12/2020 Pg.13
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed for This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE TARIQ MALIK, PE, CCM, QSD/P Construction Manager
a. TOTAL b. WITH CURRENT FIRM
20 13

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MS Civil Engineering, CSULB
(Emphasis in Construction Management) – 2000
B.Sc. Civil Engineering (with Honors), Peshawar, Pakistan – 1997 Registered Professional Engineer/Civil in the State of California License #79653
CCM #13449
Qualified SWPPP QSD/P #23298

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Award for Excellence - Henry Ford Grade Separation, CA; Global Excellence Award - Pitt River Bridge, Vancouver KEY PERSONNEL | Mr. Malik has extensive experience in project management, construction management, and contract administration (Caltrans projects or with Caltrans Oversight) in compliance with the Local Assistance Procedures Manual (LAPM) and Federal Highway Administration (FHWA) on various types of heavy civil projects, including underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities. He coordinates material inspection/certification with the Materials Engineering and Testing Services (METS) laboratory. Mr. Malik’s experience extends to construction administration, including project scheduling, project controls, project management, value engineering, partnering, and claims resolution, as well as planning, coordinating, and controlling a project from inception to completion to produce a functionally and financially viable project, completing on time and within authorized costs and to the required quality standards. He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards.

Training: 30-hour Cal OSHA, Defensive Driver, Temporary Pedestrian, Harassment Prevention Training, COVID-19 Prevention Training, AQMD Dust Control, First Aid Training, BNSF eRailSafe # 806593

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC), SR-60/Truck Lanes Project, Cities of Moreno Valley & Beaumont, California

PROFESSIONAL

SERVICES
CONSTRUCTION (If
applicable)
2019-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if the project performed with the current firm
Construction Manager: During the pre-construction phase, Mr. Malik was part of the constructability review team to improve project plans and specifications for biddability and constructability and made changes to the structural pavement section, drainage, and overall project safety. The project includes the construction of jointed plain concrete pavement (JPCP) lanes, drainage systems, concrete barriers, box culverts, wildlife paths, underground utilities, concrete structures, retaining walls, earthwork, storm drains, landscape irrigation and street markings and traffic signs. Mr. Malik monitors roadway excavation, grading, paving, trenching, landscape construction and inspection, the construction of embankment and roadway improvements, and installation of temporary and ultimate signals and light systems. He prepares and updates the project schedule from design through construction, identifies permitting and environmental requirements, assures quality control, reviews design submittals, performs constructability review, reviews design and construction contract amendments, responds to submittals and requests for information (RFIs), processes contract change order (CCOs), and extra work invoices, processes pay estimates and provides public outreach services.

Cost: $96M │Start Date: 01/2019 Completed: Ongoing 04/2022 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC), SR-91 Corridor Operations Project (COP), Corona, CA

PROFESSIONAL

SERVICES
CONSTRUCTION (If
applicable)
2020-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if the project performed with the current firm
Construction Manager: The 91 COP adds a general-purpose lane approximately 2 miles in length in the WB direction on SR-91 from Green River Road to SR-241.This would involve adding approximately 9 feet of outside widening to SR-91 at some locations and restriping in others, widening the County Line Creek Bridge, constructing new retaining walls approximately 3,200 feet in length and approximately 6 - 28 feet in Pg.14
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services height on the north side of SR-91, reconstructing a portion of Green River Road, as well as paving, trenching, grading, reinforced concrete and concrete structures, underground utilities, storm drain, and replacing overhead signs. Mr. Malik is responsible for preparing and updating project schedules through all phases, tracking project milestones and deliverables, managing project budget, assuring quality control, reviewing submittals and requests for information (RFIs), review of extra work invoices and contract change orders, coordinating activities and schedules with other entities involved in the project, including Caltrans Structures and Headquarters, coordination with the design engineer and project manager, preparing project as-built and structure closing documents in accordance with Local Assistance Procedures Manual (LAPM).

Cost: $22M │ Start Date: 11/2020 Completed: 02/2022
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Beaumont, SR-60/Potrero Avenue Interchange Project, Beaumont, CA PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2018-2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if the project performed with the current firm Construction Manager: This is a Federally Funded Project and is subject to Local Agency GuidelinesSR-60 Potrero includes constructing a new bridge over SR-60, the widening and realignment of Potrero and Western Knowles, and the addition of acceleration/deceleration lanes from Western Knowles to the SR-60 WB. Mr. Malik was responsible for preparing and updating the project schedule, identifying permitting and environmental requirements, ensuring quality control, reviewing design submittals, reviewing design and construction contract amendments, monitoring and verifying extra work invoices, coordinating field testing, and sampling. Mr. Malik was also part of the constructability review team for the project
Cost: $14M │Start Date: 02/2018 Completed: 06/2019
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County of Riverside (RCTD): Clinton Keith Road Improvements in Murrieta and French Valley, CA Guava Street Bridge, City of Murrieta, CA PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2016-2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if the project performed with the current firm Construction Manager: This $23.5M project includes the construction of 1.75 miles of four new lanes of Clinton Keith Road, a box girder bridge over Warm Springs Creek, new traffic signals at the intersections, modification of existing traffic signal, drainage improvements, street excavation, paving, trenching, grading, construction of curb and gutter, driveways, sidewalk, bus pads, curb ramps, concrete barrier, roadside signs, fence, thermoplastic markings, striping and traffic signing, as well as underground utilities, storm drain, and landscape irrigation. Tariq is responsible for updating the project schedule, identifying permitting and environmental requirements, assuring quality control, reviewing design submittals, performing constructability review, reviewing design and construction contract amendments, preparing monthly progress pay estimates, reviewing extra work invoices and contract change orders, conducting weekly progress meetings, and verifying National Pollutant Discharge Elimination System (NPDES) compliance.

Cost: $23.5M │Start Date: 5/2016 Completed: 8/2018
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-215/Van Buren Interchange Improvement Project, County of Riverside, CA PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2012-2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if the project performed with the current firm Construction Manager: This project included replacing the existing realignment of Van Buren Boulevard, a new overcrossing bridge over 1- 215 freeway, a new hook-type ramp, auxiliary lanes added to the mainline and the southbound main lane on I-215, a concrete barrier, retaining wall, traffic signals, underground utilities, drainage improvements, landscaping, sidewalks, traffic striping and signing. Mr. Malik was responsible for preparing and updating the project schedule from design through construction, identifying permitting and environmental requirements, assuring quality control, reviewing design submittals, performing constructability review, reviewing design and construction contract amendments, preparing monthly progress pay estimates, reviewing submittals and requests for information (RFIs), maintained asbuilts and prepared a project report post-construction phase in accordance with Local Assistance Procedures Manual (LAPM). Tariq coordinated materials testing, source inspection, surveying, and participated in verifying National Pollutant Discharge Elimination System (NPDES) compliance.

Cost: $32M │Start Date:07/2012 Completed: 07/2015
Pg.15
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed for This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE JUAN ROJAS, PE, QSD/P Construction Manager
a. TOTAL b. WITH CURRENT FIRM
34 8

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BSCE - Civil Engineering, Peru – 1987
Geotechnical Research - Tsukuba, Japan – 1988
Field Engineering -Polytechnic University of Cataluña Barcelona, Spain - 1990
Licensed Professional Engineer (Civil) California # C60099 QSD/QSP #21795 CASQA

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Mr. Rojas has over 34 of experience in the project management, construction management, and inspection of heavy civil projects that involve underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities. He has extensive experience managing projects requiring interfacing and coordinating with Caltrans-Local Assistance Program, Counties, Funding Agencies (Local, State, Federal- Federal Highway Administration [FHWA]), railroad & utility companies, environmental and regulatory agencies. His experience extends to construction administration, including project scheduling, project controls, project management, and partnering and claims resolution, as well as planning, coordinating, and controlling a project from inception to completion to produce a functionally and financially viable project, completing on time and within authorized costs and to the required quality standards. Mr. Rojas is well versed with project documentation, including filing electronic and hard copies, schedule reviews, monitoring budgets and technical requirements, supervising subordinate staff and monitoring document control, ensuring submittal and requests for information (RFIs) are responded with the allotted time, all incoming/outgoing documents, and reports are filed and linked electronically, various project logs are updated, and review/implement applicable project codes. Mr. Rojas is a certified Qualified SWPPP Developer & Practitioner (QSD/QSP), has excellent knowledge of Caltrans Manuals, Specifications, and Procedures, and has excellent knowledge of Caltrans manuals and Specifications and procedures.

Training: 30-hour Cal OSHA, Defensive Driver, Temporary Pedestrian, Harassment Prevention, COVID-19 Prevention Training, First Aid Training, BNSF eRailSafe 806550

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC): SR-91/Corridor Project (COP), Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Resident Engineer: The 91 COP adds a general-purpose lane approximately 2 miles in length in the WB direction on SR-91 from Green River Road to SR-241.This would involve adding approximately 9 feet of outside widening to SR-91 at some locations and restriping in others, widening the County Line Creek Bridge, constructing new retaining walls approximately 3,200 feet in length and approximately 6 - 28 feet in height on the north side of SR-91, reconstructing a portion of Green River Road, as well as paving, trenching, grading, reinforced concrete and concrete structures, underground utilities, storm drain, and replacing overhead signs. Mr. Rojas is responsible for preparing and updating project schedules through all phases, tracking project milestones and deliverables, managing project budget, assuring quality control, reviewing submittals and requests for information (RFIs), review of extra work invoices and contract change orders, coordinating activities and schedules with other entities involved in the project, including Caltrans Structures and Headquarters, coordination with the design engineer and project manager, preparing project as-built and structure closing documents in accordance with Local Assistance Procedures Manual (LAPM). Cost: $22M │Start Date: 11/2020 Completed: 02/2022 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County of Riverside Transportation Department (RCTD) Limonite Avenue at Interstate I-15 Interchange Improvements Project in the Cities of Eastvale and Jurupa Valley, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Resident Engineer: Limonite Avenue Interchange Project is a $39.6M project located at Limonite Avenue at Interstate 15 in the cities of Eastvale and Jurupa Valley. The project involves the reconstruction of the existing diamond interchange to a partial cloverleaf interchange with spread diamond ramps, loop entrance ramps, and new overcrossing at Interstate 15 and Limonite Avenue. The proposed improvements demolished the existing bridge and replaced it with a new bridge, widening of Limonite Avenue, the addition of auxiliary lanes Pg.16
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services on I-15 prior to and after a tie on and off-ramps, drainage, lighting and sign improvements, ramp metering on all on-ramps, signal modifications, relocation of various utilities, and Class II bike lanes. Mr. Rojas supervises a staff of 8 project personnel. He ensures that the project documentation is kept by the Local Assistance Procedures Manual using Caltrans filing system and meets State and County requirements.

He performs reviews and approves shop drawings, falsework, and shoring plans. CMAA- Award for the Project of the Year for RCTD: I15/Limonite Interchange.

Cost: $39.6M │Start Date: 8/2018 Completed: 2/2020
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-15/SR-79 South Ultimate Interchange, City of Temecula, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2017-2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Resident Engineer: I-15/SR-79 South Ultimate Interchange Project is a $23.6M project located at Interstate 15 with the State Route 79 in the City of Temecula. The project involved freeway improvement, roadway widening and rehabilitation, ramps improvement and realignment, earthwork, grading, asphalt concrete (AC) paving, concrete retaining walls, roadway excavation, exported soils, drainage pipes, minor concrete structures, concrete curb and gutter, traffic control, signing, striping, traffic and ramp meter signals, Class II bike lanes, irrigation and landscape, erosion control, existing AM/PM gas station demolition and removal of underground storage tanks, utility relocations power lines, sewer line, and water lines, modification of the traffic signal at the ramp intersections, lighting system, and construction of overhead signs. Mr. Rojas is tracking and monitoring project milestones and deliverables, managing project budget and minimizing exposure to risk, assuring quality control, conducting meetings, performing design submittal review, preparing pay estimates, verifying contract change orders and extra work invoices, reviewing requests for information (RFIs), and submittals. Cost: $23.6M │Start Date: 03/2017 Completed:
06/2019
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED San Bernardino County Transportation Authority (SBCTA):

I-10/Cherry Avenue Interchange Project, Fontana, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012-2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Resident Engineer: This project involved the reconstruction of an interchange, adding a new loop on-ramp, widening existing ramps, HMA paving of local streets, widening Cherry Avenue, drainage improvements, metal beam guardrail installation, traffic signals, curb ramps, sidewalk, landscape irrigation, and coordination of underground utilities. Mr. Rojas performed constructability review, oversaw quality control throughout the project, monitored project milestones and deliverables managed project budget and minimized exposure to risk, assured quality control, conducted meetings, performed design submittal review, prepared pay estimates, verified contract change orders and extra work invoices, and reviewed requests for information (RFIs), and submittals.

Cost: $50M │Start Date: 10/2012 Completed: 07/2016
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Moreno Valley: SR-60/Nason St. Overcrossing, Moreno Valley, California PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012-2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Resident Engineer: This $13M project consisted of widening Nason Street, hot mix asphalt (HMA) paving, raising the profile of Nason Street, adjusting and widening freeway ramps, intersection improvements to meet the new profile grade, new traffic signals, ADA ramps, sidewalks, streetlights extensive hardscaping, utilities, drainage improvements, replacing the existing 2-lane bridge and 1500-ft long sound wall. Mr. Rojas’ duties included extensive coordination with inspection and administration staff as this was an accelerated project, and proper documentation was critical for State and Federal reimbursement. Juan was instrumental in preparing and submitting monthly progress pay estimates, filing all incoming and outgoing emails and letters electronically and maintaining hard copies, ensuring all daily inspection dairies were prepared promptly along with photo records, verification of materials testing reports, maintenance of an updated log for requests for information (RFIs), submittals, test reports, Labor Compliance Interviews, enforce Safety and Health work, enforce SWPPP/Best Management Practices, As-built plans, etc. This project won the “CMAA” and “APWA” awards for a project of the year.

Cost: $13M │Start Date: 04/2012 Completed: 07/2015
Pg.17
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed for This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE MAJID AFANAN, PE, QSD/P Construction Manager
a. TOTAL b. WITH CURRENT FIRM
32 1

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc.,

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., Civil Engineering, University of Houston, TX, 1986 Licensed Professional Civil Engineer, CA No. C 50699 Certified QSD/QSP No. 26167

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Afanan has over 31 years of experience, emphasizing Caltrans projects' design, construction, and engineering. He has worked as a Construction Branch Chief, Senior Project Manager, Construction Manager, and Resident Engineer throughout his contract administration career. He is intensely aware of the need to adhere to contract documents and public construction contract laws and rules set by Federal, state, and local agencies when administering construction contracts. His professional assets include:
− Proven success with a history of completing projects under budget, on time, and without claims. While employed with the California Department of Transportation, he was recognized as a problem solver and assigned to complex projects requiring coordination with multiple partners and government agencies.
− Expert abilities in QA/QC of multi-disciplinary plans, including civil, electrical, mechanical, structural, and environmental engineering.

Mr. Afanan has over 15 years of experience as a Sr. Construction Engineer administering public contracts for Caltrans. He has completed over 50 Caltrans projects, including heavy civil projects consisting of underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities.

Training:

Project Scheduling Training, Critical Path Method (CPM) – Time Impact Analysis – Primavera, Claims Resolutions Process Workshop Dispute Review Board Member Training Offered by DRB Foundation – DRB Member Candidates List, Management Training Plans (MTP) Supervisory Training Program Workshops, Resident Engineer Workshop and Resident Engineer Academy, Contract Administration Seminars, Risk Management Training, Defensive Driver, Temporary Pedestrian Facilities Training, COVID-19 Prevention Training, First Aid Construction Branch19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Construction Management for SR-60 Truck Climbing Lane Project, Riverside County Transportation Commission, Riverside County, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019/2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager: The project includes the construction of JPCP lanes, drainage systems, concrete barriers, box culverts, wildlife paths, underground utilities, concrete structures, retaining walls, earthwork, storm drains, landscape irrigation, street markings and traffic signs, roadway excavation, grading, paving, trenching, landscape construction and inspection, roadway improvement, installation of temporary and ultimate signals and light systems. Mr. Afanan prepares and updates the project schedule from design through construction, identifies permitting and environmental requirements, assures quality control, reviews design submittals, performs constructability review, reviews design and construction contract amendments, responds to submittals and requests for information (RFIs), processes contract change orders (CCOs) and extra work invoices, processes pay estimates and provides public outreach services. Mr. Afanan was part of the constructability review team during the pre-construction phase to improve project plans and specifications for biddability and constructability and made changes to the structural pavement section, drainage, and overall project safety. Cost: $96M │Start Date: 1/2019 Completed: 04/2022 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Construction Management for I-15/Limonite Interchange Project, Riverside County Transportation Department, Riverside, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018-2020 2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager: This project involved the reconstruction of the existing tight diamond interchange to a partial cloverleaf interchange with spread diamond ramps, loop entrance ramps, and replacing existing overcrossing at Interstate 15 and Limonite Avenue, including demolishing the existing bridge and replaced with a new bridge, widening Limonite Avenue (near the interstate 15); addition of auxiliary lanes on I-15 before and after the on and off-ramps, roadway improvement, grading, paving, drainage, landscape irrigation, lighting improvements street marking and traffic sign installation, ramp metering on all on-ramps, and signal modifications. Mr. Afanan prepares and updates the project schedule from design through construction, identifies permitting and environmental requirements, assures quality control, reviews design submittals, performs constructability review, reviews design and construction contract amendments, responds to submittals requests for information (RFIs), processes contract change orders (CCOs) and extra work invoices, processes pay estimates and provides public outreach services. Cost: $39.6M│Start Date: 8/2018 Completed: 2/2020 Pg.18
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR-58 Freeway Realignment, Hinkley, CA, Construction, Caltrans District 8 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014-2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Branch Chief / Construction Engineer: Mr. Afanan served as Construction Engineer on this $125M, 8-mile realignment of the existing SR 58, supervising field staff, providing training, tools and equipment, resolving major and complicated issues, approving Contract Change Orders, resolves Potential Claims, and coaches Resident Engineers on Claims resolution process.

This project included the construction of two lanes in each direction of concrete pavement, two interchanges, and major drainage systems. A major challenge to the completion of the project was the construction during the drought and project specifications that called for the construction of five million cubic yards of embankments, without using water. Another issue was finding any water source due to underground water contamination in the area. It was determined in the field that this would be difficult to achieve and likely result in a large claim. The project team could satisfactorily resolve the issues and progress the construction without impact.

Responsibilities included but were not limited to planning, scheduling, and exercising supervisory authority over all engineering work in the field. Monitoring and maintaining construction-engineering quality control in the field. Providing technical guidance to support construction operations in accordance with the Department of Transportation rules and procedures. Determining budget estimates and staffing requirements for the defined scope of work, Providing performance reviews and development plans for subordinates. Maintaining a close working relationship with all project stakeholders, including design engineering, various functional units, contractors, and subcontractors.

Cost: $125M │Start Date: 04/2014 Completed: 12/2015
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-40 Freeway Rehabilitation and AC Overlay (Approx. 145 miles), Barstow/ Needles CA, Caltrans District 08
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008 -.2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Branch Chief / Construction Engineer: Mr. Afanan served as Construction Engineer on Multiple sequential projects to improve Rte. 40 from Barstow to Needles, CA (approx.145 miles) supervising multiple Resident Engineers and field staff, provides training, tools and equipment, resolves major and complicated issues, approves Contract Change Orders, resolves Potential Claims and coaches Resident Engineers on the Claims resolution process. Work included grinding portions of existing pavement and overlaying with high-quality HMA, striping and pavement delineation, and metal beam guard railings.

The project's major challenge was managing resources while working in remote areas in the middle of the desert, requiring 2-3 hours daily of travel time to the projects that were not counted for during planning. All projects were completed within budget by staggering shifts and selecting the proper staff for the assigned tasks. The second challenge was maintaining traffic, especially during major events and holidays, since I-40 is a two-lane freeway.

Responsibilities included but were not limited to planning, scheduling, and exercising supervisory authority over all engineering work in the field. Monitoring and maintaining construction-engineering quality control in the field. Providing technical guidance to support construction operations in accordance with the Department of Transportation rules and procedures. Determining budget estimates and staffing requirements for the defined scope of work, Providing performance reviews and development plans for subordinates. Maintaining a close working relationship with all project stakeholders, including design engineering, various functional units, contractors, and subcontractors. Cost: $500 M +│Start 05/2008 Completed 12/2015
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I -15 Truck Acceleration/Deceleration Lanes project, Caltrans District 8, Mountain Pass CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008-2010
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Branch Chief / Construction Engineer: Mr. Afanan served as Construction Engineer on this remote project just south of the California/ Nevada state line, supervising field staff, providing training, tools, and equipment, resolving major and complicated issues, approving Contract Change Orders, resolves Potential Claims and coaches the Resident Engineer on Claims resolution process. The Project included blasting operations for rock and earthwork removal; bridge widening; retaining walls; asphalt paving; Portland cement paving; and metal beam guard railings. This project included the construction of two additional lanes to the I-15 at Mountain Pass. The Project's major challenge was public and businesses outreach for the blasting activities of full Freeway closures. The timing of closures was carefully chosen to minimize the impacts on the traveling public and surrounding businesses. Another challenge was managing staff in this remote area and keeping project budgets under control. Responsibilities included but were not limited to planning, scheduling, and exercising supervisory authority over all engineering work in the field. Monitoring and maintaining construction-engineering quality control in the field. Providing technical guidance to support construction operations in accordance with the Department of Transportation rules and procedures. Determining budget estimates and staffing requirements for the defined scope of work, Providing performance reviews and development plans for subordinates. Maintaining a close working relationship with all the project stakeholders including design engineering, various functional units, contractors, and subcontractors. Cost: $95 M │Start 5/2008 Completed 10/2010 Pg.19
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE AHMAD FAQIH, PE, QSD/P Construction Manager/Construction Inspector a. TOTAL b. WITH CURRENT FIRM
14 14

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science in Civil Engineering
California State Polytechnic University Pomona – 2010
Registered Professional Engineer/Civil in the State of California (C 88068) QSD/QSP (26614)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Mr. Faqih has an excellent working knowledge of construction management and inspection of heavy civil projects that include underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, reclaimed water pipelines, landscape construction, potable water treatment facilities. He is familiar with the Caltrans Standard Specifications and Plans. Mr. Faqih is experienced in construction management, construction inspection, safety inspection, calculating quantities for payment, reporting daily construction activities, scheduling testing, survey, Construction Zone Enhanced Enforcement Program (COZEEP), materials, & closures. Mr. Faqih’s strengths include generating bridge grades from the 50-scale/4-scale plan, reviewing concrete mix designs, and reviewing shop drawings, including quality control plan & submittals for various structural elements. His experience includes the design & construction support of major and minor structures. Mr. Faqih is experienced in project scheduling, project controls, project management, and partnering and claims resolution, as well as field inspection, setting up and maintaining project files, processing progress payments, maintaining various logs including submittals, requests for information (RFIs), correspondence, etc., and is proficient with various computer software.

Training: 30-hour Cal OSHA, First Aid Training, Defensive Driver, Temporary Pedestrian, Harassment Prevention Training, ACI Grade 1 Certification #02101714, BNSF eRailSafe 806546

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Department (RCTD)
Hamner Avenue Bridge Replacement Project, Norco, CA
PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2020-Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: This $49M project includes roadway improvement, extensive earthwork, grading, hot mix asphalt (HMA) paving, jointed plain concrete pavement (JPCP), bridge replacement, drainage, and signals improvement. Mr. Faqih is responsible for inspection of field activities, including CIDH pile installation, traffic control, asphalt concrete (AC) paving, sidewalk, underground utilities construction inspection, paving, trenching, concrete flatwork, retaining walls, drainage improvements, water pipeline, and ensuring compliance with National Pollutant Discharge Elimination System (NPDES) requirements. He inspects construction activities to confirm compliance with the project plans and specifications and prepares daily reports documenting daily operations, time, material, and equipment. He conducts field and project progress meetings, responds to submittals and requests for information (RFIs), prepares change orders, processes monthly progress pay estimates, reviews extra work invoices, and ensures labor compliance.

Cost: $49 │Start Date: 10/2020 Completed: Ongoing
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Department (On-call)
Temescal Canyon Road Widening, Riverside County, CA
PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2019-Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: The project consists of widening Temescal Canyon Road from two lanes to four lanes through Corona from Dos Lagos to Dawson Canyon Road. This section of Temescal Canyon Road is the only alternate route to the I-15 through the area. The project involves earthwork to widen the road and cut slopes, paving, extensive underground and overhead utility relocations, drainage, concrete and roadway improvements, sidewalk and curb ramps, driveways, intersection improvements, striping, and traffic signing. Mr. Faqih is responsible for inspecting daily activities, tracking quantities for payment, verifying extra work activities and invoices, and coordinating activities and schedules with other entities involved in the project, including surveying and third-party sampling and testing services. He inspects construction activities to confirm compliance with the project plans and specifications and prepares daily reports documenting daily operations, time, material, and equipment.

Cost: $Various Amount │Start Date: 8/2019 Completed: Ongoing c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pg.20
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services SR-60 / Potrero Avenue Interchange Project, City of Beaumont, CA PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2018-2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: SR-60 Potrero includes constructing a new bridge over SR-60, the widening and realignment of Potrero and Western Knowles, and the addition of acceleration/deceleration lanes from Western Knowles to the SR-60 WB.

Mr. Faqih was responsible for field inspection, safety inspection & reporting of daily construction activities, including structure excavation, driven piles, bridge footing and columns, new drainage systems, and utility relocations. He inspects construction activities to confirm compliance with the project plans and specifications and prepares daily reports documenting daily operations, time, material, and equipment.

He prepared and verified field measurements for payment, monitored and verified extra work invoices, and coordinated field testing and sampling.

Cost: $14M │Start Date: 2/2018 Completed: 8/2019
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Caltrans District 5
• SR-1 / Sheridan Left Turn Lanes, Oceano, CA (2017)
• SR-264 Paving, Buellton, CA (2017)
• SR-264 Slurry Seal, Buellton, CA (2017)
PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: The project to widen Route 1 to add left-turn lanes at Sheridan Road Intersection. The project involved the removal of 423 Eucalyptus Trees, asphalt removal, asphalt cold planning, earthwork for new roadway lane, and paving of rubberized hot mix asphalt (RHMA), installing drainage crossings, drainage inlets and outlets, roadway signs, and new striping configuration.

Project Cost: $3M│ Length of Time Spent on Project: (9/2017-12/2017) Roadway Inspector for the project to repair failed roadway areas, cold plane roadway, and repave RHMA on Route 264 from Route 101/264 separation to Santa Rosa Creek (~6 miles). Project Cost: $9M │ Length of Time Spent on Project: (05/2017-9/2017) Lead Roadway Inspector for the project to slurry seal (type III) the roadway of Route 264 from 101/264 separation to Buellflat Rock Road (~2 miles) Cost: $2M│ (05/2017 - 06/2017) Start Date: 05/2017 Completed: 12/2017 e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County of Los Angeles On-Call Construction Engineering Services Willowbrook Green Alley, Willowbrook, CA
PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2016-2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager: Mr. Faqih was a Construction Inspector for Green Alley Project to reconstruct and improve two alleyways in the Willowbrook Community. The project consisted of curb ramp (bulb-outs) and driveway reconstruction at the alley entrances, crosswalk enhancements, pedestrian lighting, monument signs, construction of stamped patterned and colored concrete pavement, permeable concrete unit pavers, decorative living walls, asphalt concrete (AC) paving, drainage structures, curb and gutter, sidewalk, landscaping, and the performance of other appurtenant work. Responsibilities included inspecting and documenting work, field measuring quantities, preparing progress pay estimates, coordinating the work with the contractor to minimize the impact on residents and the public, coordinating with the designer and Resident Engineer to resolve conflicts in the plans, scheduling compaction, and material’s testing, and verifying ADA compliance of sidewalks and curb ramps.

Cost: $740,000│ Start Date:1/2016 Completed: 5/2017
Pg.21
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE

MOHAMMAD KHALAILEH, PE, QSD/P
Construction Manager/Construction
Inspector
Constructability Review/Labor
Compliance
a. TOTAL b. WITH CURRENT FIRM
9 9

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS Electronics Engineering, Princess Sumaya
University for Technology, Amman, Jordan - 2000
Registered Professional Engineer/Civil in the State of California, #85544 QSD/QSP #25946

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Mr. Khalaileh has construction and electrical inspection, construction management, office engineering, contract administration and labor compliance experience (Caltrans projects or with Caltrans Oversight) in compliance with Local Assistance Procedures Manual (LAPM) and Federal Highway Administration (FHWA), working on various types of heavy civil projects that include underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, reclaimed water pipelines, landscape construction, and electrical facilities. Mr. Khalaileh has an in-depth knowledge of Caltrans construction manuals in highway and structures disciplines, Caltrans standard filing system, materials inspection & certification procedures, and documentation; quantity take-offs & field measurement verification, progress estimate review, review of submittals, and RFI's. Mr. Khalaileh's expertise extends to his familiarity with Caltrans, Federal Department of Labor and State of California Division of Labor Standards Enforcement (DSLE) Compliance Monitoring Unit (CMU) requirements, and equal employment opportunity compliance (EEOC) monitoring. He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards.

Training:10-hour Cal OSHA, Defensive Driver, Temporary Pedestrian, Harassment Prevention Training, COVID-19 Prevention Training, First Aid Training, BNSF eRailSafe # 806592

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC), SR-60 Truck Lanes Project, Cities of Moreno Valley & Beaumont, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: Mohammad provides Structural, Electrical, Roadway support for this project, including the construction of dedicated lanes for trucks on SR-60 for a stretch of 4.5 miles in both directions between the cities of Moreno Valley and Beaumont; the project includes the construction of jointed plain concrete pavement (JPCP) and asphalt lanes, drainage systems, concrete barriers, box culverts, wildlife paths, underground utilities, concrete structures, retaining walls, earthwork, storm drains, landscape irrigation and street markings and traffic signs. The project also involves Environmental, Biological, and Paleo restrictions; work includes monitoring roadway excavation, grading, paving, trenching, landscape construction and inspection, the construction of embankment and roadway improvements, and installation of temporary and ultimate signals and light systems. Mohammad inspects construction activities to confirm compliance with the project plans and specifications and prepares daily reports documenting daily operations, time, material, and equipment reports, reviews compaction and materials testing reports, maintains necessary records of daily operations, facilitates contract negotiations, inspects traffic control setup and maintenance, assists the Resident Engineer in responding to submittals and requests for information (RFIs), processes contract change order (CCOs), and extra work invoices, and processing pay estimates.

Cost: $96M │Start Date: 1/2019 Completed: 04/2022
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Temecula: I-15/SR-79 South Ultimate Interchange, Temecula, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2017-2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: Mohammad provided Structural, Roadway, and Electrical inspection on this project that included the construction of a new bridge cast-in-place (CIP) box girder, new loop ramp and realignment of existing ramps; work included monitoring various roadway activities like street excavation, paving, grading, trenching, embankment and roadway improvements, installation of temporary and ultimate signals, street marking, traffic sign installation, underground utilities, concrete structures, retaining walls, drainage improvements, earthwork, and landscape irrigation. He inspected construction activities to confirm compliance with the project plans and specifications and prepared daily reports documenting daily operations, time, material, and equipment reports, conducted project progress meetings, provided public outreach services, reviewed contract documents to perform a constructability review, processed contract change Pg.22
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services orders, responded to submittals and requests for information (RFIs), and prepared progress pay estimates. Mohammad also assisted with scheduling third-party materials testing services, National Pollutant Discharge Elimination System (NPDES) compliance, and overall project safety. Cost: $23.6M │Start Date: 3/2017 Completed: 6/2019 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED LA County Department of Public Works (LACDPW) "As-Needed" Construction Inspection Services (PW14041), Los Angeles County, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2016-Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: Mohammad was selected as a Resident Engineer/Inspector for the County of LA on-call contract on the following street rehabilitation projects; the projects include street improvements, roadway excavation, paving, grading, trenching, asphalt concrete (AC) overlay sidewalk, curb ramps, and driveway reconstruction, in addition to underground utilities, storm drain, landscape irrigation, street markings and traffic sign installation, National Pollutant Discharge Elimination System (NPDES) compliance.

Mohammad inspected construction activities to confirm compliance with the project plans and specifications and prepared daily reports documenting daily operations, time, material, and equipment reports, monitored traffic control setup and maintenance, made recommendations on change orders, reviewed as-built drawings, prepared monthly pay estimates, observed third party sampling and testing for conformance with contract specifications. He also assisted in processing requests for information (RFIs) and submittals, monitoring change orders, coordinating with design engineers and project managers, and reviewing punch lists for the contractor on the following projects:

Slauson Avenue Revitalization, LACDPW $3M+. Length of Time Spent on Project: 8/2016–Ongoing • This project includes the resurfacing of roadway pavement tire rubber modified asphalt concrete, reconstruction of curb and gutter, sidewalk, driveways, curb ramps, construction of concrete pavement, crosswalks, streetscape improvements, and performance of other appurtenant work.

Firestone Blvd. Street Rehabilitation, LACDPW $2.4M+. Length of Time Spent on Project: 8/2016–Ongoing • This project includes resurfacing roadway pavement tire rubber modified asphalt concrete, reconstruction of curb and gutter, sidewalk, driveways, curb ramps, construction of concrete pavement and crosswalks, streetscape improvements, and the performance of other appurtenant work.

Cost: $13.5M │Start Date: 1/2016 Completed: Ongoing (est. 1/2024) d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County of Riverside, Magnolia Avenue Grade Separation, Corona, Riverside County, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014-2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project was performed with the current firm Construction Manager/Construction Inspector: Mohammad performed Construction Inspection on this $35M project, including roadway, electrical, signal inspection, and office engineering role on closing Magnolia Ave Grade Separation project over the BNSF double tracks on Magnolia Avenue between Lincoln Avenue and Buchanan Street in the City of Home Gardens. Mohammad inspected hot mix asphalt (HMA) and Portland cement concrete (PCC) pavement, curb and gutter, new storm drain systems, asbestos removal, street lighting installation, new signal systems, decorative picket rail fence, and roadway striping. He also prepared the plans, specifications, and estimates for traffic signal systems, highway lighting systems, fiber optic communications systems and flashing beacons using computer-aided design and drafting methods. Mohammad provided schedule review and delayed analysis.

Cost: $35M │Start Date: 5/2014 Competed: 2/2017
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR-60/Nason Street Overcrossing, City of Moreno Valley, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012-2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: This project included the replacement of the SR-60/Nason Street overcrossing structure, widening of Nason Street from Fir Avenue to Elder Avenue, and modification of the intersection and traffic signals at the intersections of the eastbound and westbound ramps and Nason Street, completion of auxiliary lanes, coordination of utility relocations, installation of landscaping, irrigation, and hardscape, construction of a sound wall between Elder Avenue and SR-60. Mr. Khalaileh was responsible for field inspection, electrical inspection, safety inspection, & reporting of daily construction activities, including structure excavation, cast-in-drilled-hole (CIDH) piles, utility relocations, preparing and verifying field measurements for payment, monitoring and verifying extra work invoices, coordinating field testing and sampling. Mohammad assisted the City with reviewing the construction schedule and providing recommendations. This project won the Construction Management Association of America (CMAA) and American Public Works Association (APWA) awards for a project of the year.

Cost: $13M │Start Date: 4/2012 Competed: 7/2015
Pg.23
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ZAID AFANAN, PE, QSD/P Construction Manager /Construction Inspector a. TOTAL b. WITH CURRENT FIRM
10 10

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., Civil Engineering, Cal State University, Fullerton, 2013 Professional Engineer, CA, Civil (C89863) QSD/P # 27444

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Mr. Afanan has diverse construction inspection, construction management, office engineering, and labor compliance experience (Caltrans projects or with Caltrans Oversight) in compliance with Local Assistance Procedures Manual (LAPM) and Federal Highway Administration (FHWA), working on notable public works and public utility construction and maintenance projects. Mr. Afanan has excellent knowledge of construction management and inspection of heavy civil projects that include underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, reclaimed water pipelines, landscape construction, and potable water treatment facilities. He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards. Mr. Afanan has experience in construction administration, including project scheduling, project controls, project management, and partnering and claims resolution, as well as field inspection, safety inspection & reporting of daily construction activities, preparing and verifying field measurements for payment, verifying extra work invoices, and coordinating fieldtesting and sampling.

Training: Fundamentals of Engineering Certificate – 2013, Snail7 Program (Surveying QA/QC (Hot Mix Asphalt), Bridge Four-Scale courses in steel and concrete, 30-Hr. Cal OSHA, ACI Grade 1 #02101718, First Aid Training, Defensive Driving, Temporary Pedestrian, COVID-19 Prevention Training, Harassment Prevention, AQMD Dust Control

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Department (RCTD): Hamner Ave Bridge Project, Norco, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020-Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: This $49M project includes roadway improvement, earthwork, grading, paving, bridge replacement, drainage, and signals improvement. Mr. Afanan is responsible for inspection of field activities, including cast-in-drilled holes (CIDH) pile installation, traffic control, paving, underground utilities construction inspection, trenching, concrete flatwork, retaining walls, drainage improvements, and ensuring compliance with National Pollutant Discharge Elimination System (NPDES) requirements. He inspects construction activities to confirm compliance with the project plans and specifications and prepares daily reports documenting daily operations, time, material, and equipment. He has implemented and maintained the Caltrans uniform filing system for project documentation, conducts progress meetings, responds to submittals and requests for information (RFIs), prepares change orders, processes progress pay estimates and extra work invoices, and ensures labor compliance.

Cost: $49M │Start Date: 10/2020 Completed: Ongoing
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Department RCTD: I-15/Limonite Interchange Improvement, Eastvale & Jurupa Valley, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: This $39M project involves a bridge replacement roadway and concrete improvement, paving, trenching, earthwork, drainage, underground utility inspection, retaining walls and landscape irrigation. Zaid inspects construction activities to confirm compliance with the project plans and specifications and prepares daily reports documenting daily operations, time, material, and equipment reports, implements and maintains the Caltrans uniform filing system for project documentation, generates various logs for submittals and requests for information (RFIs), prepared change orders and extra work invoices, provided public outreach services, processed the monthly progress pay estimate, inspected traffic control set-up, and ensured labor compliance. Zaid has been audited by Caltrans oversight, and the reviews have been very positive, with no deficiencies in the project files.

Cost: $39.6M │Start Date: 08/2018 Completed: 02/2020
Pg.24
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Caltrans A&E On-Call Construction Inspection and Materials Testing Services, Caltrans D-5 (06A2281), CA

PROFESSIONAL SERVICES CONSTRUCTION
(If applicable)
2017-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: Mr. Afanan was an Inspector for this project. The work consists of the Inspection or replacement of single and double leger roadway signs along routes 1, 101, 17, 46, 217, 135, starting in Santa Barbra County and ending in Santa Cruz County. Responsibilities included traffic control, safety, and inspection signs installed to plans and specifications.

Cost: $5.2M │Start Date: 2/2017 Completed: 1/2020
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Temecula: I-15-SR79 Interchange, Temecula, CA

PROFESSIONAL SERVICES CONSTRUCTION
(If applicable)
2017-2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: This project involved freeway improvement and widening, concrete street improvement, bridge construction, retaining walls, underground utility relocations, modification of traffic signals, street markings and traffic sign installation, earthwork, grading, paving, concrete retaining walls, roadway excavation, drainage facilities, concrete structures, curb and gutter, traffic control, irrigation, and landscape. The work consisted of inspecting construction activities to confirm compliance with the project plans and specifications and preparing daily reports documenting daily operations, time, material, and equipment reports, project documentation, conducting field and project progress meetings, reviewing and confirming as-built drawings, responding to submittals and requests for information (RFIs), preparing change orders, processing monthly progress pay estimate, reviewing extra work invoices, and ensuring labor compliance.

Cost: $23.6M │Start Date: 3/2017 Completed: 6/2019
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED San Bernardino County Transportation Authority (SBCTA): I-10/Cherry Ave.

Interchange Project, Fontana, CA
San Bernardino County Transportation Authority (SBCTA): I-10/Citrus Ave.

Interchange Project, Fontana, CA
PROFESSIONAL SERVICES CONSTRUCTION (If
applicable)
2012-2016
2012-2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Manager/Construction Inspector: These projects involved reconstruction of the interchange, adding a new loop on-ramp, widening existing ramps, extensive hot mix asphalt (HMA) paving on-ramps and local streets, widening of interchange by constructing one additional bridge over UPRR tracks, freeway widening, new ramp metering, drainage improvements, metal beam guard rail installation, traffic signals, curb ramps, sidewalk, ADA ramps, landscape, and numerous utilities. Mr. Afanan's duties are but are not limited to roadway inspection, construction on a new sidewalk, wheelchair (ADA) ramps curb & gutter, an inspection of utility relocation (water, sewer), an inspection of a new storm drain system, traffic control, pavement delineation, maintain an organized filing record/system, preparation of estimates (including bid item quantities, extra work bills, and contractor change orders). Work also included relocating numerous utilities Edison Overhead (OH) & Underground (UG), water, communication, gas, storm drain, and sewer. Mr. Afanan worked as a field construction inspector supervising backfill operations, roadway improvements, asphalt and concrete pavements, utility improvements and relocations (storm drain, water line, sewer system), traffic control, pavement delineation, temporary and permanent signs. He also helped with the filing system following Caltrans guidelines.

Cost: $50M │Start Date: 10/2012 Completed: 7/2016 (Cherry) Cost: $34M │Start Date: 2/2012 Completed: 7/2015 (Citrus) Pg.25
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE AYMAN ABDELBARI, P.E., PMP Construction Manager
Scheduling Support / Estimator
a. TOTAL b. WITH CURRENT FIRM
30 1

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) • M.Sc. in Civil Engineering, University of California, Berkeley, 1990 • B.Sc. in Civil Engineering, Kuwait University, 1987
• Registered Professional Engineer (C51997), CA
• Project Management Professional (PMP) No. 1244856
• Member, Jordanian Society of Engineers
• Member, Project Management Institute No. 1132136

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Abdelbari has over 29 years of construction experience serving as the project manager and construction manager for numerous heavy civil projects involving underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities, in addition to commercial structures, hotels, light rail, tunnels, grade separations and bridges. Mr. Abdelbari's construction administration experience includes project scheduling, project controls, project management, partnering, and claims resolution, as well as planning, coordinating, and controlling a project from inception to completion to produce a functionally and financially viable project, completing on time and within authorized costs and to the required quality standards.

Mr. Abdelbari's experience includes managing operations, dispute resolutions, analyzing claims, planning and scheduling construction projects. He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards.

Training: 30-hour Cal OSHA, First Aid Training, Temporary Pedestrian, Defensive Driving

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Venta Spur/State Route 133 Bicycle-Pedestrian Bridge, Irvine, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021-Ongoing
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Manager: The City has begun building a $6.8 million bike and pedestrian bridge over the 133 toll road and Marshburn Channel to extend the Venta Spur Trail across the City of Irvine, from Northpark to the Great Park. The bridge will connect what is now considered the end of Venta Spur Trail, at the intersection of Sable and Emberglow in Woodbury East, with a new trail along with Benchmark in Beacon Park. Scope of work will consist of cold milling, roadway excavation and paving; removal and replacement of asphalt and concrete pavement, concrete curb, gutter, trail, bridge structures, relocation of Caltrans overhead sign, guard rails; utility protection, relocation, cooperation and coordination; construction of drainage facilities; grading and erosion control; construction of retaining wall and privacy wall; coordination with Caltrans, Orange County Flood Control District (OCFCD), Irvine Ranch Water District (IRWD), Woodbury HOA, Five-point Communities.

Being the only person on the project representing the City, Mr. Abdelbari engaged in all aspects of construction management and project inspection. Cost: $230k│Start Date: 03/2021 Completed: 05/2022 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Private Developer: SR-83 Highway Improvements, Chino, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2021-2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Manager/Resident Engineer: The $230K project's scope of work consist of the construction of right-turn lanes, right-in/rightout driveways, full access driveway leading to the proposed Euclid Commerce Center (private development), reconstruction of the existing vegetated drainage channel, upgrading drainage inlets and storm drain pipes, sidewalk, underground utility coordination, Jack-and-bore steel casing across SR-83 and a recycled water main extension, street lighting improvements, landscape and irrigation. Mr. Abdelbari is tracking and monitoring project milestones and deliverables, managing project budget and minimizing risk exposure, assuring quality control, conducting meetings, performing design submittal reviews, preparing pay estimates, verifying contract change orders, and reviewing requests for information (RFIs) and submittals.

Cost: $230k│Start Date: 03/2021 Completed: 05/2022
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED OC405 Partners, I-405 Widening, Orange County, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Pg.26
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services 2018- 2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Manager/Resident Engineer: Mr. Abdelbari served as the contract/construction manager for this $1.3B project, leading the material procurement department, administering contract deviations, and heading the Disadvantaged Business Enterprise (DBE) compliance program. Mr. Abdelbari oversaw quality control measures throughout the project, assessed needs for staff and consultants/subconsultants, prepared project schedules, monitored project milestones and deliverables, identified permitting and environmental requirements, conducted progress meetings, and participated in preparing cost estimates and construction specifications. He also assisted in reviewing submittals, and requests for information (RFIs), provided public outreach services, and processed contract change orders and extra work invoices8 Cost: $1.3Billion│Start Date: 01/2019 Completed: 2/2021 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Planning, Cost, Contracts, Construction Management, Morganti Group, Jordan PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2002-2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Planning, Cost, Contracts, Construction Manager: His work included initiating, evaluating, and negotiating Variation Orders, preparing claims against the Employer, and defending claims filed by subcontractors against the main contractor. He was also responsible for planning, cost control, procurement, and document control departments. After that, Mr. Abdelbari was assigned to manage the construction of the expansion of the Ain Ghazal Pre-Treatment Facility in Amman, Jordan, which included technical, commercial, and contractual duties. Upon completing the Ain Ghazal project, Mr. Abdelbari moved to As-Samra, USD 150 mil project, as Contracts Manager. He was involved heavily in disputes between joint venture partners in the project and disputes and variation orders negotiations with the Owner.

Cost: $33M│Start Date: 11/2002 Completed: 12/2006
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Don Todd Associates, San Francisco, California
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
1991
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Scheduling/Cost Engineer/Office Engineer: Represented the City and County of San Francisco in the construction of Islais Creek Transport/Storage "C" facility; 25 million gallon capacity underground concrete structure intended for combined water and sewage. He performed Program Management duties for the City of San Francisco including Scheduling, coordination between designers, analyzing time extension requests submitted by various contractors working for the program, conducting constructability studies, and assisting in the preparation of tender packages and the compilation of contract specifications and particular conditions. Among others, duties included:
schedule analysis, reporting, payments, change control, submittals review and quality control.

Cost: $40M│Start Date: 1/1991 Completed: 7/1994
Pg.27
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed for This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE ALEX NAIME, PE, QSD/P Construction Manager
Construction Inspector
a. TOTAL b. WITH CURRENT FIRM
35 12

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science in Civil Engineering
California State University Long Beach, CA 1985
Registered Professional Engineer/Civil in the State of California, #72086 QSD/QSP #21658

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Mr. Naime has experience in construction inspection, construction management, and contract administration for heavy civil projects and various structures, buildings, and highway projects in Southern California. Mr. Naime supervises the activities of inspectors, daily site visits to ensure construction conformance with plans and specifications, prepares non-conformance reports, assists with the preparation of monthly progress payments and shop drawing reviews, and maintains daily activity log and photo log. His vast experience encompasses heavy civil projects that include underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, reclaimed water pipelines, landscape construction, potable water treatment facilities. Mr.

Naime has in-depth knowledge of construction administration, including project scheduling, project controls, project management, partnering and claims resolution, Caltrans Structures procedures and Manuals, filing system and documentation. His experience extends to an inspection of the building, train stations, water fountains, hospitals, parking structures, falsework, shoring and prestressing shop-drawing, calculations review, concrete mix designs, special Rapid Strength Concrete (RSC) mixes and application, progress estimate review, review of submittals and requests for information (RFIs). He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards.

Training: 30 Hour-Cal OSHA, Temporary Pedestrian Facilities, Defensive Driving, COVID-19 Prevention Training, Harassment Prevention, AQMD Dust Control, First Aid Training, ACI Concrete and Field Testing (Grade 1) #92272, BNSF eRailSafe # 806547

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Beaumont: SR-60/Potrero Avenue Interchange Project, City of Beaumont, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018-2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Management/Construction Inspector: Mr. Naime inspected and observed all the massive structure excavation, structure backfill, drainage excavation, and the installation of several drainage systems on the south side of the 60 freeway south of the project. Mr.

Naime confirmed compliance with the project plans and specifications, prepared daily reports documenting daily operations, time, material, and equipment reports, performed monthly quantity cost estimates, coordinated third-party sampling and testing, and conducted weekly construction meetings with Caltrans and the Contractor. Mr. Naime was also part of the constructability review team for the project. This was a Federally Funded Project and subject to Local Agency Guidelines. This project extended Potrero Boulevard over the 60 freeway with a new six-lane bridge and a new freeway interchange. The project also included improvements connecting a ramp on Western Knolls to Potrero Boulevard north of the freeway and widening the freeway on both the north and south sides.

Cost: $14M │Start Date: 02/2018 Completed: 06/2019
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC)
I-215 Mid-Section, Construction Management, Riverside, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012-2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with the current firm Construction Management/Construction Inspector: Mr. Naime was the Lead Inspector on a 12.5mile-long section of I-215 widening. His duties included reviewing schedules and submittals, managing the fieldwork and field inspectors, and coordinating with various agencies and contractors. This project widens a 12.5-mile section of the I-215 from Scott Road in Menifee to Nuevo Road in Perris. The project required extensive coordination with Caltrans District and Structures, California Highway Patrol (CHP), and traffic control. Lane closures were coordinated with Traffic Management Center (TMC), and specific attention was given to closure setup, public safety, and public awareness.

Mr. Naime coordinated source inspection with Caltrans Materials Engineering & Testing Services (METS) lab, quantity takeoff, field verification for payment, generated daily and weekly reports and monthly progress estimates, reviewed concrete mix designs, documented, and negotiated field changes, assisted with claim prevention and negotiations.

Cost: $69M │Start Date: 07/2012 Completed: 07/2015
Pg.28
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SBTCA: I-10/Citrus Avenue Interchange, Fontana, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2012-2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Management/Construction Inspector: This $34M project involved reconstruction of interchange, widening of interchange by constructing one additional bridge over UPRR tracks, adding a new loop onramp, constructing seven retaining walls, installing metal beam guardrails, widening Citrus Ave, hot mix asphalt (HMA) paving on local streets and significant drainage improvements. Mr. Naime scheduled daily inspections, performed an inspection of asphalt concrete (AC) and Portland cement concrete (PCC) paving, reviewed submittals, managed the fieldwork, reviewed the contractor schedule, submittals, filed reports, ensured correspondences and construction contract administration/filing system was in accordance with Caltrans Filing System, Caltrans Local Assistance Procedures Manual, Construction Manual, and City's policies and standards as applicable.

Cost: $34M │Start Date: 02/2012 Completed: 07/2015
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC) RTE-215/74 Interchange, Perris, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2010-2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Management/Construction Inspector: The project included freeway widening, ramp realignment, and street widening.

Construction of new retaining walls, sound walls, metal beam guardrails, drainage system, box culverts-RCB, new signalized intersections, construction/relocation of numerous utilities including (Edison, AT&T, water pipes, and drainage systems, communications & fiber optic cables), local streets improvement and streetlights. His duties included reviewing safety plans and special provisions, inspecting daily construction activities for contract compliance, and reviewing submittals. He prepared pay quantities and progress estimates, conducted weekly progress meetings, and coordinated materials inspection & certifications with Caltrans Oversight and Materials Engineering & Testing Services (METS) lab for contract compliance. He reviewed RFI's and coordinated with the designer & Caltrans Oversight staff. He prepared daily inspection reports, weekly structures reports, weekly statement working days (WSWD), weekly newsletters and monthly reports and assisted with the schedule reviews. He maintained an as-built update with a log of changes for reference.

Cost: $29M │Start Date: 08/2010 Completed: 04/2012
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Riverside: SR-91/La Sierra Interchange Improvement Project, Riverside, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007-2009
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Management/Construction Inspector: This $30M Interchange Improvement Project widened La Sierra Avenue between Diana Street and Indiana Street. Scope of work also included ramp widening and realignment, constructing 12 mechanically stabilized earth (MSE) & cast-in-place (CIP) retaining walls along ramps and bridge abutments, sound walls, drainage, traffic signals and street lighting improvements, relocating water lines, electrical and communications utilities, replacing existing La Sierra Overcrossing over SR-91 freeway and La Sierra Overhead over BNSF RR tracks. Mr. Naime duties included performing daily inspection work for roadway activities for contract compliance, field measure completed work for payment, reviewed submittals & requests for information (RFIs), coordinated materials testing and sampling in the field, coordinated source inspection with Caltrans Oversight and Materials Engineering & Testing Services (METS) lab, quantity takeoff, field verification for payment, generate daily and weekly reports, monthly progress estimates, reviewed concrete mix designs, documented and negotiated field changes, assisted with claim prevention and negotiations.

Cost: $30M │ Start Date: 10/2007 Completed: 07/2009
Pg.29
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services E. Resumes of Key Personnel Proposed For This Contract
(Complete one Section E for each key person)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE SALVADOR OROZCO Construction Inspector
Electrical/Signal Inspector
a. TOTAL b. WITH CURRENT FIRM
12 2

15. FIRM NAME AND LOCATION (City and State)
FALCON Engineering Services, Inc. Corona, CA

16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Electrical Training Institute City of Commerce, California 5/2015 (4 yr.) Journeyman Electrician, State Certified GPA (3.0)
DeVry University Anaheim, CA 6/2010 (1 yr.+) Electrical Engineering – Not completed University of Minnesota Duluth, MN 1/2007 (1 yr.+) General construction knowledge

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) KEY PERSONNEL | Salvador Orozco has 12 years of experience performing construction and electrical inspection for residential, commercial areas, and heavy civil projects that include underground utility inspection, paving, trenching, grading, concrete structures and flatwork, street improvements, retaining walls, street excavation, earthwork grading, slope construction, utility projects that include mechanical, electrical, and structural work, drainage facilities, storm drains, sewage lift stations, reclaimed water pipelines and pump stations, landscape construction, potable water treatment facilities, and electrical facilities. He was responsible for managing, monitoring field personnel, equipment, and subcontractors. Salvador coordinates work schedules and materials with prime contractors and consults with estimating, superintendents, project managers, project engineers, and field inspectors. He submits progress pay estimates, enforces safety, and schedules with the purchasing manager and vehicle maintenance manager. Salvador’s areas of expertise include plan checking, project plans, and documents quality control.

He is knowledgeable about American Public Works Association (APWA) and American Water Works Association (AWWA) standards, Underground Construction Standards, California Manual on Uniform Traffic Control Devices (MUTCD), Greenbook, and Construction Specifications Institute (CSI) standards.

Training: 10-hour Cal OSHA, Harassment Prevention Training, Defensive Driving, Temporary Pedestrian Facilities, First Aid Training

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Eastvale: Pedley Project Pavement Rehabilitation, CA PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2020-2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Inspector/Electrical Inspector: This project includes resurfacing roadway pavement, modified asphalt concrete, construction of concrete pavement, reconstruction of curb and gutter, sidewalk, driveway approaches, curb ramps, crosswalks, and street markings and traffic sign installation, drainage, and underground utility coordination. Mr. Orozco inspected construction activities to confirm compliance with the project plans and specifications and prepared daily reports documenting daily operations, time, material, and equipment reports. He inspected all aspects of traffic control set up and maintenance, prepared and made recommendations on change orders, reviewed and confirmed as-built drawings, coordinated activities with other entities involved in the project, and observed third part sampling and testing for conformance to contract specifications.

Cost: $140K │Start Date: 12/2020 Completed: 04/2021
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Riverside County Transportation Commission (RCTC): SR-60 Truck Lanes Project, Cities of Moreno Valley & Beaumont, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2019-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Inspector/Electrical Inspector: Salvador provides construction and electrical inspection on this project that includes the construction of dedicated lanes for trucks on SR-60 for a stretch of 4.5 miles in both directions between Moreno Valley and the City of Beaumont. The project includes the construction of jointed plain concrete pavement (JPCP) lanes, drainage systems, concrete structures, retaining walls, box culverts and wildlife paths (culverts). Mr. Orozco is responsible for inspection of roadway activities, including roadway excavation, construction of embankment and roadway improvements, installation of temporary and ultimate signals, monitoring projects for NPDES compliance. He inspected construction activities to confirm compliance with the project plans and specifications and prepared daily reports documenting daily operations, time, material, and equipment.

Cost: $96M │Start Date: 1/2019 Completed: 04/2022
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Shawnan, Downey, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2018-2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Pg.30
Key Personnel Resumes ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services Construction Inspector/Electrical Inspector: Mr. Orozco performed construction and electrical inspection for several projects, including Bell Gardens Street Rehabilitation, City of Commerce Reconstruction Project, which consisted of utility coordination, storm drain, landscaping, storm drain, Monterey Park Street Rehabilitation, Torrance Reconstruction Project, and various other locations. Mr. Orozco inspected construction activities to confirm compliance with the project plans and specifications and prepared daily reports documenting daily operations, time, material, and equipment reports. He inspected all aspects of traffic control set up and maintenance, prepared and made recommendations on change orders, reviewed and confirmed as-built drawings, coordinated activities with other entities involved in the project, and observed third part sampling and testing for conformance to contract specifications.

Cost: Various Amounts │Start Date: 12/2018 Completed: 01/2020 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belco Elecnor, Inc, Chino, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014-2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Inspector/Foreman Electrician: Mr. Orozco managed construction activities to confirm compliance with the project plans and specifications and prepared daily reports documenting daily operations, time, material, and equipment reports, inspected all aspects of traffic control set-up and maintenance, reviewed and confirmed as-built drawings for utility projects, coordinated activities with other entities involves in the project, prepared monthly pay estimates, observed third party sampling and testing for conformance with contract specifications, and provided feedback to requests for information (RFIs).

The projects Mr. Orozco works on were the following:
• Corona Foothill Street Widening Project (Signal and lighting, Edison duct bank installation). • Laurel & Alder Rialto Project, Edison (Duct bank installation, street lighting). • I-10 & Cherry Avenue Improvement, Caltrans (Signal and lightning, ramp metering systems, highway and sign lighting, communications) • I-15 & Clinton Keith Road Improvement, Caltrans (Signal and lighting, ramp metering systems, highway, and sign lighting communications) • Ramona & Indian Avenue Street widening project
• I-210 & 5th St. Street lighting/ AT&T Duct Bank project • Cajalio Rd & Clark St. Intersection
• I-15 & Baseline (Signal and lightning, ramp metering systems, highway and sign lighting, communications) • I-15 & Jefferson Indio Project (Signal and lighting, ramp metering) Cost: $Various Amounts Start: 11/2014 Competed: 12/2018 e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lincoln Pacific Builders, Inc. Baldwin Park, CA
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2011-2014
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if the project performed with current firm Construction Inspector/Journeyman Electrician/Apprentice Electrician: Mr. Orozco managed projects and ordered materials. He was responsible for maintaining work truck equipment, repairing electrical issues by replacing or installing components, wiring or devices, and determining the steps necessary to assess an electrical situation using testing devices, blueprints, and maps. He maintains a safe work environment by adhering to all company guidelines and OSHA safety requirements and reporting violations of policies, procedures, and guidelines to his immediate supervisor.

The projects Mr. Orozco worked on were the following:

Riverside Ave. & Easton Ave. Improvement, City of Rialto (Signal and lighting, street lighting, parking lot lighting, Edison vaults and duct banks, AT&T duct bank, So-Cal Gas sleeves)
I-15 & Nisquali Overpass, Caltrans (Signal and lighting, highway and sign lighting, ramp metering systems, communications, street lighting, false lighting, parking lot lighting)
• Glen Oaks Blvd. Improvement, City of Glendale (Signal and lighting, lighting, communications, Glendale Water and Power conduits) • I-210 Myrtle & Monrovia
• Portola & San Canyon Irvine T-Intersection
Cost: $Various Amounts Start: 8/2011 Competed: 11/2014
Pg.31
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT

KEY NUMBER
1 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED I-15/LIMONITE INTERCHANGE, COUNTY OF RIVERSIDE, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018-2020

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Riverside County Transportation
Department (RCTD)
Hector Davila, Construction Manager (909) 677-8888

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) FALCON Engineering Services (FALCON) provided construction management services to assist Riverside County Transportation Department.

This project improved the existing freeway interchange at Interstate 15 (I-15) and Limonite Avenue, located within the cities of Eastvale and Jurupa Valley in Riverside County. Within the project limits, I-15 currently is a six-lane, three mixed-flow lanes in each direction, accessed, controlled freeway. Along I-15, improvements are proposed from approximately 0.60 miles south to 0.60 miles north of the existing Limonite Avenue overcrossing (OC) bridge. The project extended along Limonite Avenue from Hamner Avenue to Wineville Avenue. The Limonite Avenue OC bridge currently provides two traffic and two left-turn lanes at the ramp intersections. This project proposed replacing the existing Limonite Avenue OC, widening the roadway from four lanes to six lanes, reconstructing the ramps to provide a partial cloverleaf (Type L-7) and constructing loop ramps in southeastnorthwest quadrants. The on and off-ramp gore points were extended, providing longer acceleration and deceleration capacity.

Construction Cost: $39.6M

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
FALCON Engineering Services
(2) FIRM LOCATION (City and State)
Corona, CA
(3) ROLE
Prime: Construction Management
b.
(1) FIRM NAME
Francis Consulting
(2) FIRM LOCATION (City and State)
Villa Park, CA
(3) ROLE
Subconsultant: Landscape Inspection
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Relevant Features:
• Interchange Replacement
• New Ramp Alignments (On/Off-ramps
• New NB/SB Loop On-ramps
• Ramp Meters
• Auxiliary Lane
• Freeway Widening-Aux Lanes
• New Pavement Section (JPCP, AC,
Rapid Set Concrete)
• Roadway/Street Improvement
• Signalized Intersection
• Sidewalk – ADA Compliance
• Striping, Marking & Thermoplastic
• 2-Stage Bridge Construction
• Retaining Walls, Sound Walls
• Multiple Stages-Roadway & Ramps
• Utilities (Water, Electrical, fiber Optics,
Comm.)
• SWPPP Plan & Monitoring
• Traffic Signals / Control on Freeway
and Local Streets
• Night Closures on Mainline and Ramps
• Excellent Safety Record
• Survey Staking & Materials Testing
• CIDH Piles Footings, Spread Footings
• CIP-PS Box Girder Bridge
Superstructure
Key Staff –
Juan Rojas, Resident Engineer
Majid Afanan, Construction Manager
Pg.32
Section F - Example Projects
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services Relevant Features:
• Roadway Rehabilitation
• HMA Paving
• ADA Sidewalk/ ADA Ramps
• Storm Drains
• Drainage Inlet Structures
• Roadway Widening
• Street Signalization
• Utility Relocation
• Excellent Safety Record
• Detours/Traffic Control
• Landscaping
• Caltrans Standards
• Greenbook Standards
• New Cast-in-place Prestressed
Concrete Box Girder Bridge
• New Wildlife Overcrossing
• 2 Miles of new Roadway Alignment
• ADA Compliant Ramps and Sidewalk
• New Drainage Structures
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT KEY
NUMBER
2 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Construction Engineering Services On-Call Basis, Riverside County Transportation Department (RCTD)
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2014- Ongoing In Process

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Riverside Transportation Dept.
(RCTD)
Khalid Nasim, PE
Engineering Division Manager (951) 955-3337

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The FALCON team is providing construction management and inspection services for the County of Riverside On-call basis for bridges, roadway, and roadway-related facilities. Duties include construction management services, source inspection services according to Greenbook, Caltrans standards, manuals, LAPM, and project-specific quality management plan. Project personnel provides detailed diaries with the inspection performed, relevant conversation, a situation encountered, time spent on each work order, etc. and maintains a photo log for each project.

SR-79 Widening
The SR-79 Widening project is located north of the
City of Murrieta, within an unincorporated portion of
southwestern Riverside County. The northern end of
the project is approximately 4.4 miles east of
Interstate 215 (I-215), and the southern end is about

2.8 miles east of I-215. The SR-79 Widening Project
relieves congestion, improves safety, and provides
consistency with other improvements along SR79. The SR-79 Widening Project widens a 5.4-mile segment of SR-79 from two to four lanes between
Thompson and Domenigoni Parkway, modifies local
access, and improves various intersections.

Clinton Keith Road Improvements
FALCON provided Construction Management
Support services, plan review, and biddability. The improvements include approx. 2 miles of new roadway from Whitewater Road to Leon Road, construction of a new bridge over Warm Water Creek, new wildlife overcrossing bridge, retaining wall system east of Warm Spring Creek, installation of a new traffic signal at the intersections, modification of existing traffic signals, drainage improvements, curb and gutter, driveways, sidewalk, bus pads, curb ramps, concrete barrier, roadside signs, fence, thermoplastic markings and striping. FALCON team and Structures Representative performed a thorough Constructability Review and made specific recommendations to the County.

Temescal Canyon Improvement
▪ Widening from Dawson Canyon Rd to 0.7 Mile North.
▪ Slurry Seal From 0.7 Mile North of Dawson Canyon Rd to Leroy RD In the Temescal Valley Area. ▪ Created a spreadsheet to verify the placed slurry quantity based on special provision technical data. Checked all set traffic control and daily closure during activity.
▪ Inspected Installation of new waterline CMLC pipe 18.0” & 42.0”, reviewed & inspected elliptic RCP installation. ▪ Coordinate and arrange with related utility agents, Edison, AT&T, Fiber optics etc. ▪ Inspected the construction process of retaining walls, concrete pour, rebar enforcement per Caltrans standard plans and RSP placement per special plans. Inspected daily SWPPP performance and conduct biweekly SWPPP Report. ▪ Prepared daily inspection reports & quantities and monthly payment estimate. Record and report any force Account (Time & Material) work, referring to the up-to-date Surge Charge Manual.

Cost: (2-Contracts)
$2M 2013/2017
$3.5M 2017/2022

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
FALCON Engineering Services (Prime)
(2) FIRM LOCATION (City and State)
Corona, CA
(3) ROLE
Prime: Construction Management/Quality Assurance
b.
(1) FIRM NAME
Francis Consulting
(2) FIRM LOCATION (City and State)
Villa Park, CA
(3) ROLE
Subconsultant: Landscape Inspection
Key Staff –
Kurt Pegg, Project Manager/Resident Engineer
Tariq Malik, Structures Rep
Ahmad Faqih, Construction Inspector
Pg.33
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services Relevant Features:
• Roadway/Street Improvement
• Asphalt Concrete Paving
• ADA Sidewalk/ ADA Ramps
• Traffic/Signal/Electrical
• Reconstruction of Traffic loops
• Adjust Manholes
• Adjust Valves for different utilities
• Installation of Striping
• Pavement Markers
• Detours/Traffic Control
• Caltrans Standards
Key Staff –
Juan Rojas, Construction Manager
Mohammad Khalaileh, Construction Inspector/Electrical
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT KEY
NUMBER
3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED On-Call Construction Management Services
Temecula, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2018-2023

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Temecula Avlin Odviar, Project Manager (951) 693-3969

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) FALCON Engineering Services
(FALCON) is providing construction
management, inspection, and testing
services for the pavement rehabilitation
program.

Winchester Road (Jefferson Avenue to
Ynez Road) for Pavement
Rehabilitation Program. The work for
this project includes pavement
improvements along Winchester Road
from Jefferson Avenue to Ynez Road. Improvements include, remove and replace existing asphalt pavement, reconstruction of traffic loops, adjust existing manholes and valves for different utilities, and installation of striping and pavement markers, coordination of underground utilities, traffic loops, striping and traffic signing, sidewalk, concrete street paving and slurry seal.

Santa Gertrudis Creek Pedestrian/Bike Trail PW (08-04)
Santa Gertrudis Creek Pedestrian/Bike Trail provides an extension to connect the existing trail network at Ynez Road to the east and Diaz Road to the west to complete the loop within the City's bike trail system to the northeast of the proposed trail.

Features Include:
• 1-mile of Class I Ped/Bike Trail along southern bank of Santa Gertrudis Creek
• 13-ft wide paved trail with striping, safety fencing, and retaining walls. • Dedicated under-crossings at Ynez Road, Interstate-15, and Jefferson Avenue.
• Connects several miles of the 17-mile Temecula Loop
Contract Value:
$4M

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
FALCON Engineering Services (Prime)
(2) FIRM LOCATION (City and State)
Corona, CA
(3) ROLE
Prime: Construction Management/Inspection
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Pg.34
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services Relevant Features:
• Roadway Rehabilitation
• ARHMA Paving
• ADA Sidewalk/ ADA Ramps
• Storm Drains
• Drainage Inlet Structures
• Roadway Widening
• Street Signalization
• Utility Relocation
• Excellent Safety Record
• Detours/Traffic Control
• Landscaping
• Caltrans Standards
• Greenbook Standards
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT KEY
NUMBER
4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED City of Moreno Valley On-Call for Construction Management and Peer Review Plan Check Services
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2013-2022

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER City of Moreno Valley Michael Loyds, PE
Land Development Manager (951) 413-3120

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) FALCON team is providing Construction Inspection
Services for the City of Moreno Valley on the “On-Call” basis for bridges, roadway, and roadway-related
facilities. Services include construction management
services, document control, permitting, source inspection services in accordance with Greenbook, Caltrans
standards and manuals, LAPM and project-specific
quality management plan. Project personnel provides
detailed diaries with the inspection performed, relevant conversation, a situation encountered, time spent on
each work order, etc. and maintaining a photo log for
each project.

Oliver Street Project Bridge Repair, City of Moreno Valley, Moreno Valley, CA - Land Development Department provided construction management and inspection services for the OnCall Moreno Valley project. The project included the retrofit and replaced the bridge backwalls, approach slabs, and treated the bridge surface with methacrylate, which protected the bridge surface, protect pads with galvanized keeper plates placed per plan, and secured with galvanized screws which sprayed with anti-rust spray. The project was required to open four drain openings in the forfeit. The rebar was carefully inspected before the saw cut using ultrasound technology, and all exposed rebar treated with a special material called Sika100, the material used exposed rebar (Epoxy).

FALCON inspected the mixing ratio and the spreading application, and the sand usage, creating a friction surface. It was required to coat the concrete
barrier sidewalk and exterior bridge Girder with Sika 550 W sealant and place a joint seal. The plan required
installing four signs (Load Warning Signs), two per City Standards, and two per Caltrans Standard. Finally, the
project treated a portion of Oliver Street North of the north approach slab and South of the south approach
slab with slurry seal paving Type II with 2.0% latex
FALCON inspected the mixing ratio, as well as the
spreading application and the sand usage creating a friction surface. It was required to coat the concrete barrier sidewalk and exterior bridge Girder with Sika 550 W sealant and place a joint seal.

The plan required installing four signs (Load Warning Signs), two of them per City Standards, and two were per Caltrans Standard. Finally, the project treated a portion of Oliver Street North of north approach slab and South of south approach slab with slurry seal paving Type II with 2.0% latex. 801-0081 Citywide Pavement City Moreno Valley, Moreno Valley, CA, Rehabilitation Project 18/19 Public Works Department
The scope of work was to rehabilitate various streets in the City of Moreno Valley per the City’s plan. The work includes cold milling to 1.5” and place 1.5” ARHM asphalt, and inspecting the grinding depth and limits. Also, checking the asphalt material mix design, assuring ambient temperature, and asphalt temperatures are within specification. 801-0084 Citywide Pavement City Moreno Valley, Moreno Valley, CA, Rehabilitation Project 19/20 Public Works The project is to rehab some of Moreno Valley City Streets as per plan, it includes cold milling to 1.5” and place 1.5” ARHM asphalt, removing and reconstructing an ADA access ramps at various street’s corners per plan or Caltrans Standards.

Contract Value: $23.5M

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
FALCON Engineering Services (Prime)
(2) FIRM LOCATION (City and State)
Corona, CA
(3) ROLE
Prime: Construction Management/Inspection
Pg.35
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services Relevant Features:
• Roadway/Street Improvement
• Permit and Planning
• Field Inspection/Utilities Investigation
• Project management/Records
maintenance
• Knowledge of federal, state, and local
construction regulations and codes
applicable to structural
facilities/utilities design and
construction
• Strong interpersonal skills and the
ability to effectively communicate with
a wide range of individuals and
constituencies in a diverse community
• Strong working relationships within a
team environment
• Quality and safety standards
• Knowledge and understanding of
utility operations and standards as
applied to a large-scale public facility
• Scheduling and budgeting
Key Staff –
Juan Rojas, Construction Manager
Mohammad Khalaileh, Construction Inspector/Electrical
Ahmad Faqih, Construction Inspector
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT KEY
NUMBER
5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED As-Needed Construction Inspection Services
Los Angeles County Public Works Dept, Los County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2011-2021

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Los Angeles Department of
Public Works Charles Chen, Senior Civil Engineer (626) 238-3055

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) FALCON was selected by the County of Los
Angeles Department of Public Works to
perform construction management, inspection,
and utility coordination for projects throughout
Los Angeles County. FALCON performed
construction inspection for various projects
which includes resurfacing of roadway
pavement tire rubber modified asphalt
concrete; reconstruction of curb and gutter,
sidewalk, driveways, and curb ramps;
construction of concrete pavement and
crosswalks, and streetscape improvements;
and the performance of other appurtenant work
FALCON team is effectively managing key
issues, including utility coordination, monitoring
utility relocation, removal, and installation
progress. FALCON encourages safety and
environmental policies and procedures per
applicable building code standards, approved
plan details, and engineers specifications. The
range of work covers contract administration,
public works construction, civil, structural,
utility restorations, streets and sidewalks
pavement restorations, traffic signals and
controls/signage/striping and restorations,
water utilities, and facilities construction from
conception to closeout.

Projects locations include:
• Slauson Avenue Revitalization
• Willowbrook Green Alley
• Firestone Boulevard
Contract Value:
$13.5M

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
FALCON Engineering Services (Prime)
(2) FIRM LOCATION (City and State)
Corona, CA
(3) ROLE
Prime: Construction Management/Inspection
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Pg.36
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT

KEY NUMBER
6 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Project Name: County of Los Angeles On-Call
City, State: Los Angeles, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
NA On-Going

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER County of Los Angeles Yona Halpern 626.703.9596

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) RMA was contracted in 2011 for a three-year with two option year as-needed geotechnical, materials testing and inspection services contract. Services provided to the County include geotechnical investigations for various county facilities. At the General William J. Fox Airfield, RMA completed a pavement structural section investigation to determine if the existing pavement could support the additional loads from landing, taxiing, and takeoffs of a Lockheed C-130. The investigation included taking cores to determine in-place pavement structural section, soil samples, laboratory testing, and structural section calculations utilizing FARFIELD.

For the SR-126 interchange, RMA is currently providing Quality Assurance testing services. Responding as requested by the County representative, RMA is completing compaction testing during the compaction of the earthwork and aggregate base.

During the production process for hot mix asphalt, our scope of work is to provide a field technician to perform in-place density testing during compaction operations and plant testing including sieve analysis, asphalt content, maximum theoretical density, and moisture content of mix.

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
RMA Group
(2) FIRM LOCATION (City and State)
Carson, CA
(3) ROLE
Material Testing Inspection Services
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Pg.37
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT

KEY NUMBER
7 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Puente Hills Automotive: Puente Hills Toyota Dealership and Site Master Plan, Puente Hills, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2016-2017

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Hitchcock Automotive Group Howard Hakes 626-839-8409
[email protected]

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Design and development of master planning 13 acres site. Included development of grading plans, stormwater and hydrology studies, soil remediation and closure of wells, master planning and subdividing of 13 acres, landscape design and development thru the construction of all civil and landscape services. Design and development of Automotive dealership site and building design.

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Francis Consulting
(2) FIRM LOCATION (City and State)
Puente Hills, CA
(3) ROLE
Landscape Design
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Relevant Features:
▪ Landscape Design
▪ Grading Plans
▪ Stormwater
▪ Hydrology Studies
▪ Soil Remediation
▪ Subdividing acre
Pg.38
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT

KEY NUMBER
8 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Northridge Toyota Dealership, Parking Structure Master Plan, and Development, Northridge, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2016-2017

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Hitchcock Automotive Group Howard Hakes 626-839-8409
[email protected]

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Northridge Toyota dealership and parking structure design and master planning 8-acre site development. Design and development of Automotive dealership site and building design. Included development of grading plans, storm water and hydrology study, landscape design and development thru inspection and construction of all entire civil and landscape services.

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Francis Consulting
(2) FIRM LOCATION (City and State)
Puente Hills, CA
(3) ROLE
Landscape Design
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Relevant Features:
▪ Landscape Design
▪ Grading Plans
▪ Stormwater
▪ Hydrology Studies
▪ Subdividing acre
Pg.39
Section F ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project)

20. EXAMPLE PROJECT

KEY NUMBER
9 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Orange Coast Automotive Development: Cadillac, Buick, GMC, Costa Mesa, CA
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2017-2019

23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Suburban Collection Automotive Group Tim Leroy 248-519-9888 [email protected]

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Orange Coast automotive dealership and parking structure design and master planning 7-acre site development. Design and development of Automotive dealership site and building design. Included development of grading plans, storm water and hydrology study, landscape design and development thru inspection and construction of all entire civil and landscape services.

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
Francis Consulting
(2) FIRM LOCATION (City and State)
Puente Hills, CA
(3) ROLE
Landscape Design
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Relevant Features:
▪ Landscape Design
▪ Design Build
▪ Grading Plans
▪ Stormwater
▪ Hydrology Studies
Pg.40
Section G ● City of Cypress On-Call Construction Management / Engineering Support / Testing and Inspection Services G

KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS

26. NAMES OF KEY PERSONNEL
(From Section E, Block 12) 27. ROLE IN THIS CONTRACT
(From Section E, Block 13)

28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10
1 Maha Faqih, PE Principal-in-Charge     
2 Kurt Pegg, PE, QSD/P Consultant Construction Scheduling Support Analyst Responsible Person 
3 Ashraf Mohamed, PE Construction Manager/Resident Engineer 4 Tariq Malik, PE, CCM, QSD/P Construction Manager/Resident Engineer   5 Juan Rojas, PE, QSD/P Construction Manager/Resident Engineer    6 Majid Afanan, PE, QSD/P Construction Manager/Resident Engineer  7 Ahmad Faqih, PE, QSD/P Construction Manager/Construction Inspector   
8 Mohammad Khalaileh, PE, QSD/P Construction Manager/Construction Inspector  
9 Zaid Afanan, PE, QSD/P Construction Manager/Construction Inspector 
10 Alex Naime, PE, QSD/P Construction Manager/Construction Inspector
11 Salvador Orozco Construction Inspector/Electrial/Signal Inspector
12 13
14 15
16 17
18 19
20 29. EXAMPLE PROJECTS KEY
NUMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER TITLE OF EXAMPLE PROJECT (From Section F) 1 I-15/Limonite Interchange, County of Riverside 6 County of Los Angeles On-Call, Los Angeles 2 Construction Engineering Services On-Call Basis, Riverside County Transportation Department (RCTD) 7
Puente Hills Automotive, Puente Hills Toyota Dealership and Site Master Plan
3 Construction Engineering Services On-Call Basis, City of Temecula 8 Northridge Toyota Dealership Parking Structure Master Plan and Development
4 On-Call for Construction Management and Peer Review Plan Check Services, City of Morneo Valley 9 Orange Coast Automotive Development, Costa Mesa 5 As-Needed Construction Inspection, County of Los Angeles Public Works Department 10
Pg.41
Section G - Key Personnel Participation in Example Projects a. SIGNATURE b. DATE

PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 2b. STREET 5. OWNERSHIP
a. TYPE
2c. CITY 2d. STATE 2e. ZIP CODE
b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE

7. NAME OF FIRM (If Block 2a is a Branch Office)
6b. TELEPHONE NUMBER 6c. EMAIL ADDRESS
8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER

9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function
Code b. Discipline c. Number of Employees a. Profile
Code b. Experience
c. Revenue Index
Number
(1) FIRM (2) BRANCH (see below)
Other Employees
Total

11. ANNUAL AVERAGE PROFESSIONAL

SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)

PROFESSIONAL SERVICES REVENUE INDEX NUMBER

1. Less than $100,000 6. $2 million to less than $5 million

2. $100,000 to less than $250,000 7. $5 million to less than $10 million

3. $250,000 to less than $500,000 8. $10 million to less than $25 million

4. $500,000 to less than $1 million 9. $25 million to less than $50 million

5. $1 million to less than $2 million 10. $50 million or greater

12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
c. NAME AND TITLE
STANDARD FORM 330 (REV. 7/2021) PAGE 6

1. SOLICITATION NUMBER (If any)

ARCHITECT-ENGINEER QUALIFICATIONS
E
TITLE
a. Federal Work
PW-006-22
FALCON Engineering Services, Inc. 2007 MU8MACVPYKH1
1020 Aquino Circle
S Corporation
Corona CA 92879
Small Business Enterprise (SBE)
Maha Faqih, President
[email protected]
N/A
(951) 768-9419

N/A N/A N/A
02 Administrative 10 C15 Construction Management 7
15 Construction Inspector 20
16 Construction Manager 10
38 Land Surveyor 1
46 Photogrammetrist 3
48 Project Manager 2
Other Employees 4
50 2
2 6
Maha Faqih, President
05/05/2022
b. Non-Federal Work
c. Total Work
1020 Aquino Circle
Corona, CA 92879
Phone: (951) 549-9600
www.falcon-ca.com
Proposal For
On-Call Construction Management/
Engineering Support/ Testing and Inspection Services
Contact: Nick Mangkalakiri, PE
Assistant City Engineer
5275 Orange Avenue
Cypress, California 90630
May 5, 2022
Gannett Fleming, Inc.
20 Pacifica, Suite 430, Irvine, CA 92618
t: 714.749.0090
www.gannettfleming.com
May 5, 2022
Mr. Nick Mangkalakiri, PE
Assistant City Engineer
City of Cypress
5275 Orange Avenue
Cypress, CA 90630
Re: Proposal for On-Call Construction Management/ Engineering Support/ Testing and Inspection Services Dear Mr. Mangkalakiri,
To keep pace with current and future infrastructure needs, the City of Cypress (City) has identified a seven-year Capital Improvement Program (CIP) identifying major public improvements to the City’s infrastructure over the next several years.

Projects will include streets, traffic signals, storm drains, sewers, parkways, public facilities, and parks that are anticipated to be funded by various major funding sources.

Gannett Fleming, Inc. (Gannett) was founded in 1915, and has since built a reputation for excellence, growing to more than 2,700 employees (including more than 500 CM/I professionals) located in more than 65 offices nationally. We have been a driving force in shaping infrastructure and improving communities in more than 65 countries, offering services in construction management and inspection, engineering, acoustics, architecture, business and technology solutions, program management, environmental management and remediation, geotechnical, project delivery, safety and security, valuation and rates, and vertical transportation.

Gannett and several of our highly qualified team members will provide the City with a locally-based team with the benefit of our national experience in providing solutions to infrastructure challenges. This team brings extensive experience providing on-call construction management, engineering support, and material testing and inspection services for cities and other public agency clients throughout California. For this on-call contract we offer:

Experienced Team – Proven Project Manager, Mike Broadwater, CPESC, QSD/P, ToR, will be your single point of contact for this project. Mike has over 30 years of experience as a Contract/Project, Task Order Manager, and Inspector on various federal, state, and locally funded projects. Mike has successfully managed two consecutive on-call contracts with the City over 10 years. Throughout that time he has established solid relationships with the City, while processing staffing requests and providing quality assurance with staff, verifying the City is receiving services to meet the needs of your projects. Mike will be proactive and responsive by providing the right staff to fit your project needs, such as NASSCO certified inspectors or engineers and inspectors with federally funded project experience. Leading the inspection team, Construction Inspector, Warren Williams, will serve as boots on the ground working directly with the City Public Works, Maintenance and Engineering staff, neighborhood association groups, residents, and other stakeholders to mitigate concerns. As a proud local resident with existing City experience, Warren has established relationships in the City and the construction industry enabling him to provide inspection services on multiple CIP and encroachment permit projects, at a cost-savings to the City. Warren’s goal is to be receptive and responsive to the needs of City residents and business that may be impacted by CIP projects and mitigate and resolve issues in the field before they escalate. In addition to Mike and Warren, Gannett has Civil Engineers and Inspectors versed in pavement management and sewer lining construction, along with Structural Engineers, Geotechnical Engineers and Architects to support the City.

Gannett Fleming, Inc.
20 Pacifica, Suite 430, Irvine, CA 92618
t: 714.749.0090
www.gannettfleming.com
Depth of Experience in Construction Management and Inspection On-Call Contracts – Our team has completed numerous projects with similar scope and complexity. We are 100% committed to the goals and objectives presented by the City. Mike has managed several on-call contracts and understands the need for responsiveness to project requirements, scope of work, and staff flexibility to meet project schedules, including rapid deployment to meet sudden project demands. Mike has also identified and carefully selected our as-needed subconsultants, Ninyo & Moore, and Guida Surveying who are committed to delivering exceptional services under this on-call contract. Mike’s relationships with these firms will also ensure prompt communication on the delivery of services to the City.

Communication, Collaboration, and Coordination – These are the three keys to stakeholder involvement and a successful project. As Project Manager, Mike’s proactive management style is the framework that facilitates these keys to success to avoid and minimize cost and schedule impacts and - just as important - to deliver the quality expected through each task order project. Mike recently and successfully managed dozens of task/purchase orders for the City of Cypress and DWR on multiple and consecutive contracts. As Task Order Manager, Mike worked with the City to deliver over 100 task/purchase orders.

Gannett is confident our resources, experience, expertise, and commitment will ensure our team performs the services and adheres to the requirements described in this RFP. We look forward to providing high-quality services that exceed your expectations by delivering on time, within budget, and with attention to safety. We will manage the City’s contract from our Irvine office located at 20 Pacifica, Suite 430, Irvine, CA 92618.

Please do not hesitate to contact Mike Broadwater at 714.749.0070 or [email protected], should you have any questions regarding this proposal. We appreciate your time and consideration in reviewing our proposal and look forward to the opportunity to work with the City on this contract.

Sincerely,
Edward Durazo, CCM, CPM - Vice President, Regional Manager Southern California C: 626.926.1568 | E: [email protected]
PAGE A-D-1 (REV. 8/2016) STANDARD FORM 330 AUTHORIZED FOR LOCAL REPRODUCTION A. CONTRACT INFORMATION

1. TITLE AND LOCATION (City and State)
On-Call Construction Management/ Engineering Support/ Testing and Inspection Services

2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER April 14, 2022
B. ARCHITECT-ENGINEER POINT OF CONTACT

4. NAME AND TITLE
Mike Broadwater, CPESC, QSD/P, ToR - Project Manager

5. NAME OF FIRM
Gannett Fleming, Inc.

6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
714.749.0090 760.682.3230 [email protected]
C. PROPOSED TEAM
(Complete this section for the prime contractor and all subcontractors.) (CHECK)

9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
PRIMEJ-V PARTNERSUBCONTRACTOR
a. X Gannett Fleming, Inc. 20 Pacifica, Suite 430
Irvine, CA 92618
Prime: Construction Management,
and Engineering Support |
Testing and Inspection

CHECK HERE IF BRANCH OFFICE
b. X Guida Surveying, Inc. 9241 Irvine Blvd, Suite 200
Irvine, CA 92618 Engineering Support

CHECK HERE IF BRANCH OFFICE
c. X Ninyo & Moore 475 Goddard, Suite 200
Irvine, CA 92618
Engineering Support |
Testing and Inspection

CHECK HERE IF BRANCH OFFICE
d.
□ CHECK HERE IF BRANCH OFFICE
e.
□ CHECK HERE IF BRANCH OFFICE
f.
□ CHECK HERE IF BRANCH OFFICE

PART I - CONTRACT-SPECIFIC QUALIFICATIONS
D. ORGANIZATIONAL CHART OF PROPOSED TEAM

ARCHITECT - ENGINEER QUALIFICATIONS
(Attached)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE A-D-2 D. ORGANIZATIONAL CHART OF PROPOSED TEAM

PROJECT MANAGER
Mike Broadwater, CPESC, QSD/P, ToR

CITY OF CYPRESS
Nick Mangkalakiri, PE
Legend
Key Staff ..........................................

NASSCO Certified ..........................*
Guida Surveying............................ (G)
Ninyo & Moore .............................(N)
Resumes are provided for all Key Staff PRINCIPAL-IN-CHARGE/

CIPP TECHNICAL ADVISOR
Ed Durazo, CCM, CPM *

DEPUTY PROJECT MANAGER
Michael Yepiz *
A. CONSTRUCTION MANAGEMENT
Resident Engineer/
Construction Manager
Maurice El-Hage, PE
Shu-Jon Mao, PE, QSD/P
Kitt Tongthaworn, PE,

SE, QSD/P, LEED AP
Michael Yepiz *
William Saumier, MPM
Mary Jo Bachini
NPDES Support
Mike Broadwater, CPESC,
QSD/P, ToR
Construction Inspector
Warren Williams
Bill Fernandez
Thomas Michael, EIT *
Michael Yepiz *
Rhodie Lumanog, CMIT
Clint Pittman
William Saumier, MPM
Greg McDowell (Electrical)
B. ENGINEERING SUPPORT
Architect
Philip Klinkon, AIA
Martin Ramirez, Jr., RA, AIA, NCARB
Civil Engineer
Mike Trail, CCM *
Derek Smith, PE, ENV SP
Stewart Vaghti, PE, CFM, ENV SP, LEED AP
GIS Support
Brendan Wesdock, MCP, GISP
Guida Surveying
Ninyo & Moore
CADD
Ted Keane, ENV SP
Surveyor
Tim Fettig, PLS (G)
Constructability Review and
Value Engineering
Maurice El-Hage, PE
Byron Dixon
Kitt Tongthaworn, PE, SE, QSD/P, LEED AP
Pavement Management
Byron Dixon
Phil Pollock, ACI
Grant Management and
Labor Compliance
Jennifer Saldivar, CPM *
Document Control and Database
Management
Jennifer Saldivar, CPM *
Rhodie Lumanog, CMIT
Mark Shipotofsky
Scheduler
Jim Gallego, PE
Cost Estimating
Mark Shipotofsky
C. TESTING AND INSPECTION
Materials Testing
Randy Reichert (N)
Quality Control/Assurance
Paul Medina (N)
Vance Hunter (N)
Utility Detection
Ninyo & Moore - Ground Penetration Radar
Structural Engineer
Kitt Tongthaworn, PE, SE, QSD/P, LEED AP
Geotechnical Engineer
Jerry Pascoe, PE, GE
Garreth Saiki, PE, GE (N)

RISK MANAGEMENT AND SAFETY
Dave Albright, CSP, CIH
Andrew Christofas, PMP, PMI-RMP, PMI-SP
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-1

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management, Engineering Support,
Material Testing and Inspection, City of Cypress, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Project and Contract Manager for two consecutive on-call contracts with the City of Cypress. For over ten years, Mike managed consultant inspectors and material testing subconsultants via one hundred plus purchase orders for various CIP projects and Non-CIP Permit projects. Examples of CIP projects include the annual slurry seal program, annual concrete rehabilitation program, sewer rehabilitation, lining, sewer, and water line replacement, park improvements, pavement rehabilitation, replacement arterial and residential streets, and median and landscape improvements. Mike also provided submittal reviews, staffing requests, cost proposals, scope of service/work plans, invoicing, coordination meetings, client and customer service, and provided QA/QC. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection,
City of Garden Grove, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Project and Contract Manager for two consecutive on-call contracts with the City of Garden Grove. Mike managed consultant inspectors on several purchase orders for various CIP projects. The CIP projects include the annual slurry seal program, sewer, and water line replacement, pavement rehabilitation and replacement for arterial and residential streets, and median and landscape improvements. He processed staffing requests, cost proposals, scope of service/work plans, invoicing, coordination meetings, client and customer service, and provided QA/QC over staff and services delivered to the City.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Mike Broadwater, CPESC,
QSD/P, ToR
Project Manager/
NPDES Support
31 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS, Civil Engineering, Lafayette College EIT: CA No. XE101658 Certified Professional Erosion & Sediment Control (CPESC), EnviroCert International, Inc. No. 2096
Qualified SWPPP Developer/Practitioner, (QSD/P),
CASQA, No. 00062
CA Construction General Permit Trainer of Record (ToR), No. 00062

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mike has 31 years of experience in all aspects of project management for on-call services contracts, from client meetings, project cost proposals, developing task orders and scopes of work, managing budgets, managing field staff and subconsultants, quality assurance, and discussing consultant performance with clients. Additionally, Mike is experienced in providing construction management services on Federal, State, and local public works improvement projects.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-2 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection,
City of Rancho Santa Margarita, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2013
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Project and Contract Manager for this on-call contract with the City of Rancho Santa Margarita. Mike managed consultant inspectors on purchase orders for various CIP projects. The CIP projects included annual slurry seal program, sewer rehabilitation, sewer and water line replacement, pavement rehabilitation and replacement for arterial and residential streets, and median and landscape improvements. He processed staffing requests, cost proposals, scope of services, invoicing, client and customer service, and provided QA/QC over staff and services delivered to the city.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection,
City of Yorba Linda, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2010
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Project and Contract Manager provided supervision of consultant inspectors and material testing subconsultants for various CIP projects and Non-CIP Permit projects. CIP projects included the annual slurry seal program, annual concrete rehabilitation program, sewer rehabilitation, lining, sewer, and water line replacement, park improvements, pavement rehabilitation and replacement for arterial and residential streets, and median and landscape improvements. Non-CIP permit work included projects for Yorba Linda Water, Golden State Water, private developers, and AT&T. Mike also provided submittal reviews, processed staffing requests, cost proposals, scope of service/work plans, invoicing, coordination meetings, client and customer service, and provided quality assurance/quality control over staff, subconsultants and services delivered to the City. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Project Management Services,
California Department of Water Resources (Division of
Engineering), Various Locations, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Contract and Project Manager on four consecutive statewide on-call contracts, with a combined value of $145M.

He provided overall project coordination and budget control and verified the team provided quality services. He oversaw all staff, including subconsultants, and provided task order and contract management. Mike also worked with DWR to provide qualified candidates for inspection, contract administration, and engineering services positions; monitored costs per task order and contract allocations; performed site visits as part of the Contract QA/QC and reviewed staff performance and staffing needs with DWR’s office managers and construction supervisors. Projects featured levee construction/repair, pipelines, pumping plants, encroachment permits, channel construction, environmental rehabilitation, and emergency repairs, including the Oroville Dam Spillway, and included projects with federal funds reimbursement.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-3

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection
Services for Water Distribution Conveyance, Santa Clarita Valley Water Agency (SCVWA), Santa Clarita, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Project Principal for the $100M repair and replacement of the SCVWA’s water infrastructure, including various water pipeline conveyance, treatment, storage, and support facilities, including pump stations. He supported implementing the Agency’s CIP projects within its 195-square-mile service area throughout Los Angeles and Ventura Counties. The program also included various water services ranging from planning through design to construction and startup. Ed also assisted SCVWA with water infrastructure backlog projects; monitored project progress; ensured team compliance with Agency’s policies, procedures, and schedules; and provided as-needed QA/QC reviews. Projects included the following:
• PFAS Groundwater Treatment and Well Q2 Perchlorate Removal Facility ($8.1M). • Magic Mountain Parkway Phase 6a B&C Review ($4.6M).
• Mission Village 01A/01C Water Systems Improvements Project – Development Staff Augmentation ($7M). • CL118A Bouquet Canyon Road Pipeline, Groundwater Containment, Treatment & Restoration ($5.5M). • CL118B Groundwater Production, Restoration, Transmission Mains ($13.3M). • Rio Vista Treatment Plant Expansion ($37M).
• Earl Schmidt Chemical Storage and Delivery Project ($488K). • Newhall Lateral Reach 2A Modifications ($188K).
• Newhall Lateral Reach 2B Facility Modifications ($440K). • Foothill Feeder Turnout Structure ($2.9M).

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Ed Durazo, CCM, CPM Principal-in-Charge/
CIPP Technical Advisor
30 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Certificate for Construction Management, California
Polytechnic State University, Pomona
Certificate for Construction Management, California
Polytechnic State University, Pomona
Project Management Certification
The National Association of Sewer Service Companies
(NASSCO), Inspector Training & Certificate Program
(ITCP) for the Inspection of Cured-in-Place-Pipe (CIPP) Installations

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ed offers over 30 years of experience in the construction management industry; having provided services in the capacity of a contractor, project/construction manager, contract manager, and QA oversight, he has a comprehensive, welldefined approach to providing construction management services. He has served as principal-in-charge for multiple agencies, including the Santa Clarita Valley Water Agency, Chino Basin Desalter Authority, Eastern Municipal Water District, Elsinore Valley Municipal Water District, and the Santa Ana Watershed Project Authority. He has also managed a $100M program for SCVWA and managed the largest (at the time) micro-tunneling project in the nation, valued at more than $150M in construction improvements for the City of Oxnard.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-4 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED As-Needed Construction Management Support Services,
San Diego County Water Authority, San Diego, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Contract Manager for multiple task orders. Services included construction management, inspection, nondestructive examination of welds, materials testing, soil testing, geotechnical engineering services, resident engineer services, and administrative support services. Task orders included: Vallecitos Water District 11/Vista Irrigation District 12 Flow Control Facility Project ($4.96M); Mission Trails Water Quality Improvement ($3K); San Vicente Post Construction ($7.5K); San Diego 28 Flow Control Facility and Geotechnical Services for Access Portal Site #16 ($9.7M).
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Eastside Water Treatment Plant Expansion and Brine Line, City of Chino, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Principal-in-Charge responsible for maintaining client contact, managing the budget, and providing as-needed quality assurance and quality control reviews. The project expands the $15.5M City’s Eastside Water Treatment Facility (EWTF) from 3,500 gallons per minute (GPM) to 7,000 GPM. Project elements include a booster pumping station, booster pumps, two storage reservoirs totaling 4.5 mg capacity, and two separate brine pipelines to convey backwash and softener waste from the EWTF to a Santa Ana Watershed Project Authority lateral owned and operated by the Inland Empire Utilities Agency.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Euclid Ave. Maintenance Access Structure Rehabilitation Project, Santa Ana Watershed Project Authority, Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Principal-in-Charge responsible for maintaining client contact, managing the budget, and providing as-needed quality assurance and quality control reviews. The $481K project consisted of rehabilitation of five MAS structures along Euclid Ave. by repair and or replace of the T-Lock lining, new epoxy coated lids and outlet flanges and new concrete manhole risers with a full removal of MAS 4A – 0180 and installation of a new pipe connection section.

The MAS 4D-0030 and 4D-0060 were located within the USACE right-of-way and also within a protected habitat requiring additional notification and monitoring coordination requirements. Additional coordination was required with Caltrans for traffic control along Euclid Ave.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Inland Empire Brine Line Lower Reach IV-B and C.R.C.

Lateral Utility Protection, Santa Ana Watershed Project Authority, Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Principal-in-Charge responsible for maintaining client contact, managing the budget, and providing as-needed quality assurance and quality control reviews. The $1.4M project consisted of removal of the 36” HOBAS lined RCP pipe (IV-B) and existing 15” VCP and 16” DIP (C.R.C. lateral) and manholes, replaced with approx. 410 LF of 36” HDPE fused pipe , installation of a (3) new 60” MAS structures, and installation of a 18” HDPE pipe and appurtenances. A temporary brine line bypass system was required in order to complete these improvements. Work within this area of the project required coordination with adjacent contracts as well as coordination with the USACE and the City of Corona.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-5

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Euclid Ave. Maintenance Access Structure Rehabilitation, Santa Ana Watershed Project Authority, Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Manager/Inspector for this $481K project that consisted of rehabilitation of five MAS structures along Euclid Ave. by repair and/or replace of the T-Lock lining, new epoxy coated lids and outlet flanges and new concrete manhole risers with a full removal of MAS 4A – 0180 and installation of a new pipe connection section.

The MAS 4D-0030 and 4D-0060 were located within the USACE right-of-way and also within a protected habitat requiring additional notification and monitoring coordination requirements. Additional coordination was required with Caltrans for traffic control along Euclid Ave. Serving as SAWPA extension of staff, Michael reviewed plans and specifications for contract compliance; responses to submittals and RFIs; contractor schedule of activities; change order requests, contract change orders, and progress payments. Prepared and conducted weekly construction progress meeting agendas and minutes. Coordinated specialty inspection efforts; construction activities with City of Corona, USACE, and Caltrans; and coordinated and facilitated swift resolution of site conflicts. In addition, Michael provided field inspection; daily activity reports, and all photo documentation.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Michael Yepiz Deputy Project Manager/
Resident Engineer/CM /
Construction Inspector
45 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Project Management Program, California State University, Fullerton Extension
General Education and Business Courses, Orange Coast
College and Coastline College
Inspector Training & Certification Program for the
Inspection of Cured-in-Place-Pipe (CIPP) Installations, the National Association of Sewer Service Companies
(NASSCO) (CIPP-217-020196)
OSHA, Competent Person, Confined Space
Crane Safety, Excavation and Shoring
Trenchless technologies
E-rail
AQMD dust control
California A and B Contractor’s License

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Michael has more than 45 years of experience in heavy civil construction which includes project, operations, and general management positions for both public works and private projects throughout California. He has extensive experience in wet utilities such as water, sewer and storm drain. He is also highly experienced in the area of potable and wastewater pumping facilities and wastewater treatment facilities. During his career, Michael has acquired experience in a variety of trenchless technologies such as fold and form, CIPP, pipe bursting, HDPE slip lining, pipe jacking, top hats, spot repairs and all activities related to those rehabilitation methods. Additional areas of experience include grading, paving and concrete structures of all sizes. He is experienced in reviewing and negotiating change orders, reviewing progress payments, and preparing monthly reports. As General Manager of a highly respected general engineering firm, Michael oversaw and managed many multi-million-dollar projects completed for numerous agencies.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-6 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Inland Empire Brine Line Lower Reach IV-B and C.R.C.

Lateral Utility Protection, Santa Ana Watershed Project Authority, Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Manager/Inspector for this $1.4M project that consisted of removal of the 36” HOBAS lined RCP pipe (IV-B) and existing 15” VCP and 16” DIP (C.R.C. lateral) and manholes, replaced with approx. 410 LF of 36” HDPE fused pipe, installation of a (3) new 60” MAS structures, and installation of a 18” HDPE pipe and appurtenances.

A temporary brine line bypass system was required in order to complete these improvements. Serving as SAWPA extension of staff, Michael reviewed plans and specifications for contract compliance; responses to submittals and RFIs; contractor schedule of activities; change order requests, contract change orders, and progress payments.

Prepared and conducted weekly construction progress meeting agendas and minutes. He coordinated specialty inspection efforts; construction activities with City of Corona, USACE, and Caltrans; and coordinated and facilitated swift resolution of site conflicts. In addition, Michael provided field inspection; daily activity reports, and all photo documentation.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED San Diego 28 Flow Control Facility Project, San Diego
County Water Authority, San Diego, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Resident Engineer for this $9.7M project that rehabilitated and/or replaced aging infrastructure at the existing flow control facility and hydroelectric facility. In addition to field responsibilities, Michael was responsible for coordinating project issues with the Authority and Designer accordingly to maintain forward construction progress and mitigate issues in a timely fashion.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection
Support Services, Moulton Niguel Water District, Aliso
Viejo, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Contract Manager provided as-needed staff augmentation, construction management and special inspection of electrical work, startup and commissioning, linings and coatings, structural work, welding, and other general overflow inspections.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management/Engineering
Support/Testing and Inspection, City of Cypress, CA,
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Submittal Reviewer for this as-needed construction management and inspection services for various task orders in support of the City’s Capital Improvement Program (CIP) as well as several permits or non-CIP projects. Michael provided services for the following task orders:
• Community Center Parking Lot Seal.
• Construction Inspection for Sewer Rehabilitation CDBG. • Construction Inspection for Concrete Rehabilitation.
• Inspection Services for Sewer Relining.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-7

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pleasanton Bus Rapid Transit Corridor Enhancement
Project, Livermore Amador Valley Transit Authority
(LAVTA), Pleasanton, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Manager for coordination between the contractor, LAVTA, and the City of Pleasanton for upgrades to 19 bus stations along the Santa Rita, W. Las Positas, and Owens Drive BRT corridors. The $819K upgrades add a variety of amenities to improve the transit experience and correct the existing roadway and pedestrian pathway corridor. Amenities include ADA improvements, rapid-style bus shelters, enhanced lighting, real-time signs, benches, trash receptacles, map racks, and bicycle racks. Bill is responsible for providing construction management and coordination between the contractor, LAVTA, and the City of Pleasanton. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Capital Projects (2009-2019), County of San
Diego, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Project Manager for large master-community projects consisting of sports complexes, historic structure restorations, roads, bridges, large excavations, parking lots, underground storm water filtration structures, pump stations, utilities, post-tension slabs, photovoltaic energy systems, and multiple school district improvement projects.

Bill provided coordination with public, private, and permit agencies; contractor progress meetings; contracts; constructability reviews; estimates; consultant proposal negotiations and contracts; estimating and written notification; contract specifications, forecasting, daily reports, safety and quality inspections, risk assessment, mitigation, submittals, RFIs, and utility coordination; development and completion of punch lists; project as-built plans and specifications. Additional large master-community projects included: Rios Avenue Road Construction and Lighting (Chula Vista, CA); Cactus Park Parking Lot (Lakeside, CA); Otay Valley Regional Park Trails-Phase 1 (Chula Vista, CA); Hilton Head Park Phase 2 (El Cajon, CA); and Steele Canyon Turf Conversion (San Diego, CA).

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
William “Bill” Saumier, MPM Resident Engineer/
Construction Manager
38 2

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) AAS, Construction Engineering Technology, State
University of New York at Canton
California General Contractor’s License Class A (in
progress)
Certified Master Project Manager (MPM), International
Project Management Board Certification
OSHA Certifications - 40 Hour HAZWOPER Training
Certification
Safety Training Course for Safe Operations on Cranes,
Capital Engineering Laboratories

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Bill is a Construction Manager with over 38 years of experience. His brings experience in heavy civil construction, which includes start to finish rail, bridge (box girder, steel girder, concrete I-beam), mass grading, road, utility, building, and waterway construction utilizing Caltrans standards. He is responsible for site monitoring, contract conformity, ensuring that projects are delivered in conformance with plans and specifications, and serving as the owner’s liaison among the contractor, designers, and regulatory agencies. Bill has also served as a Lead CM on multiple construction projects totaling over $20M in construction costs. He also oversees daily construction activities and quality assurance inspections, leading weekly field meetings, monitoring permit compliance, certifying monthly payment applications based on project progress, and evaluating and negotiating extra costs.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-8 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED WestCat Bus Wash Replacement, Western Contra Costa
County Transit, Bay Area, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Manager responsible for the owner representation, construction administration and management of the replacement of an antiquated bus wash with a new, double-decker wash and all associated utility and paving updates. The $567K project scope includes demolition and removal of the existing bus wash and wash water reclamation system; site clearing; alteration of existing utilities; addition of new utilities; construction of equipment room, and partially-enclosed structural canopy, installation of a new bus wash system including wash water reclamation system; landscaping; concrete pavement; and transitioning of new work to areas of existing grade. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED County Regional Park Improvements, Spring Valley, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2004
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Project Engineer for the $320M design consultant management of structures, landscape, irrigation, trails, and county regional park improvements that included a Little League Sports Complex along with other Environmental Impact Report (EIR) park improvements. During construction, managed county park betterments consistent with the EIR scope of work. Project included submittals, requests for information, as-built drawings, Operation and Maintenance (O&M) manuals, environmental, and inspections through the final acceptance. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Renaldi Street Undercrossing, Caltrans, Northridge, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
1995
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Project Manager for this $6M project to replace two bridge substructures, 1 mile of 8-lane freeway, and seismic retrofit of damages caused by the Northridge Earthquake. He provided project supervision, subcontract coordination, scheduling, surveying, materials, and equipment ordering via purchase orders POs, RFIs, submittal, shop drawing, on-site design, specifications and provided coordination for new service installations, including scheduling shutdown, relocating existing services, testing, and commissioning services. The project was completed 16 days ahead of schedule with a $150,000 early completion incentive bonus and zero accidents.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-9

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 23rd Avenue and 29th Street Bridges, Caltrans District 4, Oakland CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Area Manager for this $64M project that was completed in five stages and included the widening of I-880, construction of retaining walls and sound walls, demolition, construction of off-ramps, and demolition and construction of the 23rd Avenue Bridge overpass over I-880 due to clearance issues. Managed multiple construction staffing units; planned workload balancing and resource allocation; demonstrated ability to effectively apply logic and creativity in the decision-making process; used partnering process internally and externally to resolve claims and general construction potential impasses; applying project budget control techniques to deliver the project within the allotted budget and permitted timeline.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR-92/I-880 Interchange, Caltrans District 4, Hayward, CA PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2011
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Area Manager for this $160M new interchange that included reconstruction of Calaroga Bridge, reconstruction of Eldridge Pedestrian Overcrossing for ADA compliance, new connector ramps, improvements at Hesperian Boulevard Interchange, and a new auxiliary lane on I-880 in both directions. The project also included extensive community involvement. Maurice planned and directed the work of a large group of engineering staff, monitored day-to-day operation of contractors, analyzed work progress and associated risks, resolved claims, prepared payment quantities, and managed to complete all the work with quality under budget and within the permitted schedule.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Widening of I-880 and I-238, Caltrans, Alameda and
Santa Clara Counties, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Area Manager for the management and administration of this construction program which totaled approximately $1B. He demonstrated skills in managing multiple construction staffing units; planning workload balancing and resource allocation; demonstrating ability to effectively apply logic and creativity in decisionmaking process; using partnering process internally and externally to resolve claims and general construction potential impasses; applying project budget control techniques to deliver the project within the allotted budget and permitted timeline.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Maurice El-Hage, PE Resident Engineer/CM 36 1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) MS, Civil Engineering, Construction Management,
San Jose State University
BSCE, Civil Engineering, San Jose State University
PE: CA (Civil) - No. C45656

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Maurice has over 36 years of experience working on numerous state, federal, and locally funded construction projects throughout California. His diverse background includes managing, staffing with capable personnel, coordinating with local entities, budgeting resources and equipment as necessary to administer contracts of all sizes and complexities.

Maurice has managed multi-faceted projects in his previous career with Caltrans, ranging from complex highway projects, local roads, fast-paced emergency repair projects, and Quick-Build projects with heavy community involvement.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-10 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-880 Capital Preventative Maintenance Project, Caltrans, San Francisco/Oakland, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Area Manager for the $44M I-880 Express Lane project funded by MTC/BATA and administered by a local consultant firm with Caltrans as the oversight agency. The construction of this project co-existed, and was simultaneously ongoing, with three (3) other major construction projects administered by Caltrans, under Maurice as the Construction Manager, all throughout the 29 miles of I-880. The project consisted of converting an existing HOV lane to an express lane involving the installation of electric wiring, proper electronic components, overhead signage, as well as new lane configuration and striping. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-880 Median Barrier Replacement, Caltrans, Alameda
County/Oakland, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Area Manager for the $56M project called to demolish and re-install approximately 24 miles of concrete median barrier from Fremont to Oakland along Interstate 880 (I-880). New LED lighting was installed in the median and the project provided the initial construction for a future express lane project. This stretch of 1-880 is heavily congested with traffic during peak morning and evening commute hours. All construction was performed at night due to no day-time lane closures, substandard median shoulders, and no access to the median during the day.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-11

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 25th Avenue Grade Separation, Peninsula Corridor Joint
Powers Board/Caltrain, San Mateo, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM As part of the JPB/Caltrain On-Call Program/Construction Management Services contract, Shu-Jon served as Construction Manager/Resident Engineer for the $87M replacement of the existing at-grade crossing with a two-track elevated grade separation and relocation of the Hillsdale Caltrain Station northward. Work involved the construction of 1 mile of new railroad grade separation by partially raising the rails in a lightweight-cellularconcrete (LCC) filled mechanically stabilized earth (MSE) retaining wall; partially depressing the existing road; and constructing two new road connections. Grade crossings required installation of two new concrete precast bridges and a steel bridge. The project also involved construction of a new elevated, center-board, Caltrain station and a two-cell cast-in-place pedestrian viaduct, grading and drainage improvements, changes to existing traffic lights, additional street and platform lighting, relocation of existing rail signals, and custom-made shelters and other station amenities. Responsible for administering the contract in accordance with the LAPM; scheduling; preparing contract change orders; claims avoidance; quality assurance; permit compliance; maintaining public safety; and coordinating with multiple stakeholders while working adjacent to the active rail line.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Shu-Jon Mao, PE, QSD/P Resident Engineer/CM 26 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS, Civil Engineering, University of California, Berkeley PE: CA (Civil) - No. C66634 Qualified SWPPP Developer/Practitioner, No. C66634

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Shu-Jon Mao has 26 years of experience providing engineering and construction management services for a wide range of public infrastructure improvements, including highways and roadways, bridges, and rail transit stations.

He has served as Resident Engineer on 10 projects, all of which were completed without claims. Shu-Jon also has extensive experience providing engineering and construction management services for public works improvements in residential settings, including streetscapes, roadway rehabilitation, roadway construction, and bridge replacements.

He has in-depth knowledge of the complexities of transportation enhancements, including transit, pedestrian, and bicycle elements; roadway reconstruction and realignment; pavement resurfacing; storm drain improvements; traffic, signal, street lighting, and other electrical improvements; landscape improvements. Shu-Jon is proficient with safety procedures, constructability analysis, contract administration procedures, claims resolution, and CPM scheduling. He has in-depth knowledge of Caltrans’ Standard Plans and Specifications and manuals and extensive experience working on Caltrans projects. His Caltrans portfolio features the $50M highway improvements, which widened 2 miles of the highway from two to three lanes in each direction, constructed two major intersections, and constructed six new or improved bridges. He was responsible for supervising all project staff, making sure that the projects were constructed to the plans and specifications, writing the projects’ codes of safe practice, working with involved agencies to ensure permit compliance, monitoring implementation of SWPPP measures, coordination of utility relocations, public outreach, contract administration, and reporting of labor compliance and funding reimbursement.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-12 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Highway 101 Roadway Improvements, Caltrans District 5,
Santa Barbara, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Resident Engineer for two highway improvement projects: (1) the $50M four-stage Highway 101 Operations Improvements (Milpas Street to Hotsprings Road), which involved the reconstruction of two major interchanges, construction of six new or improved bridges, freeway widening, improvements to local streets, drainage facilities, concrete median barriers, open graded asphalt concrete overlay, signalization, and landscaping; and (2) the $2M Highway 101 on-ramp widening, which involved the staged construction of a 127-meter retaining wall supported by micropiles and soil anchors; removal of aerially deposited lead; and the installation of new drainage systems, new signal poles, and landscaping. Shu-Jon was responsible for resident engineering, coordinating with responsible agencies, overseeing construction inspection, preparing contract change orders, claims avoidance and resolution, processing progress payments, tracking costs, reviewing the schedule, public relations, and overall management of the project.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rehabilitation of Three Bridges on State Route 8, Caltrans District 59, Pine Valley, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2006
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Assistant Structure Representative and later the Structures Representative for the $3.8M rehabilitation of the Pine Valley Creek Bridge, Sweet Water River Bridge, and La Posta Creek Bridge on State Route 8. Work included the installation of new structural steel cross frames, removal and replacement of existing bearing pads (by jacking abutment), grinding and replacement of existing asphalt concrete surfacing with polyester concrete overlay, and removal and replacement of joint seals. Responsible for performing field inspection and certifying materials; reviewing submittals, RFIs, and progress payments; assisting with contract change orders; maintaining documentation; performing claims avoidance; and scheduling. In addition, he was also responsible for calculating gap dimensions for the installation of joint seal assemblies, reviewing concrete mix design, performing profilograph and determining “must grind” locations, performing stability checks for temporary formwork, field inspection during new structural steel frame installation and during bridge jacking to replace bearing pads, and determining grades for polyester concrete overlay.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-80/Highway 4 Retrofit and Widening, Caltrans District 4, Hercules, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
1998
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Assistant Resident Engineer/Structures Representative for this $10M project that involved the demolition of two existing bridges and the construction of three new cast-in-place, pre-stressed box girder bridges and various retaining and wing walls up to 18 feet high. The bridges were built over Union Pacific Railroad and near the Highway 4 interchange. Shu-Jon was responsible for inspecting piles, footings, columns, falsework review, falsework erection, falsework grading and removal, box girder construction, rebar, concrete, pre-stressing, hinge construction, survey layout for line and grade, determined deck and soffit elevations from 4-scale drawings, sampling concrete, cost analysis and quantity calculations for contract change order work, and project payment reports. In addition, he also completed the final walkthroughs and punch lists with the contractor as well as finalizing all contract records and closeout.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-13

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management, Engineering Support,
Material Testing and Inspection, City of Cypress, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Lead Inspector for two consecutive on-call contracts with the City of Cypress. Since May of 2012, Warren has provided services on over 100 separate task/purchase orders encompassing Capital Improvement Program (CIP) as well as several permits or Non-CIP projects. Warren provided project/construction management, coordination, public outreach, and inspection for various encroachment permit projects that include new development, utilities, and SWPPP. He inspected various CIP projects for the City which included sidewalks, curb and gutter, driveway and ADA ramp replacements, tree removal and replacement, slurry seal type 1 and 2, sewer replacement and lining, street widening, relocation of utilities, asphalt grind and overlay, storm drains, biofiltration systems, stormwater retention systems, new median construction, traffic signals replacement and camera upgrades for traffic monitoring, fiber optic installation and 5G construction. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection,
City of Garden Grove, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for CIP projects that included the annual slurry seal program, sewer, and water line replacement, pavement rehabilitation and replacement for arterial and residential streets, and median and landscape improvements. Warren provided inspection for four street rehabilitation locations at Westminster Avenue and Brookhurst Street.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Warren Williams Construction Inspector 40 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Courses in Business Management, West Virginia State
College
Coursework, Detroit College of Business, Greenbrier
Community College, and Cerritos Community College
Storm Water Pollution Prevention Training

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Warren has over 40 years of experience in public works construction that includes serving in management roles with several cities, functioning as a consultant inspector and working as a contractor. He has provided services that include construction inspection, inspection supervision, scheduling, estimating, contract change order management, contractor payment approval, records maintenance, budget management, public relations, and permitting. Warren has provided training for city and consultant inspectors on city standards and specifications, the APWA Greenbook, and American Water Works Association (AWWA) requirements. After completion of training he would monitor and supervise the inspectors for quality control and quality assurance of their work. He is experienced with street construction/ improvements, traffic signals, storm drain systems, sewer systems, domestic/reclaimed water systems, joint utility trench, street lighting systems, and landscaping, soundwalls and similar public works construction. He is well versed in grading operations, roadway structural sections, asphalt and concrete placement, environmental compliance, traffic control implementation, maintenance work, Greenbook and local agency requirements, Caltrans specifications, NPDES storm water requirements, and safety regulations as they relate to construction. Warren has excellent communication and organizational skills and is an excellent trouble-shooter in the field.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-14 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection,
City of Rancho Santa Margarita, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2013
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for CIP projects that included annual slurry seal program, sewer rehabilitation, sewer and water line replacement, pavement rehabilitation and replacement for arterial and residential streets, and median and landscape improvements. Warren provided inspection in preparation and then application, on various street locations (45 streets), the crack filling and sealing of asphalt streets along with weed abatement of all curb and gutters in those areas. After the slurry seal was completed the replacement of all striping and legions along with the yellow/white/ blue reflectors were replaced and installed. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Inspection Services, Golden State
Water Company, Various Locations, Southern CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2012
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for this public utility company that purchases, produces, distributes, and sells water to nearly a quarter-million customers in California. He was responsible for providing inspection services on capital and new business projects, which included water main system upgrades, construction of new reservoirs, seismically retrofitting and waterproofing existing reservoirs, chlorination facilities, new meters, new and relocated fire hydrants, fire service/sprinkler system lines, irrigation systems and connections to private residences. Warren maintained as-built plans, daily and weekly reports, safety reports, and change order documentation; obtained permits from various cities and regulatory agencies; monitored traffic control; and maintained good public relations for the company. Further responsibilities included loading and hydrostatic pressure testing the system, performing bacteria testing, verifying NPDES requirements and monitoring final tie-in connections. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Various Projects, Golden State Water Company,
Various Locations, Southern CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2005
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Resident Engineer/Inspector for more than nine years. Warren provided services for this public utility company (formerly Southern California Water Company) that purchases, produces, distributes, and sells water to nearly a quarter-million customers in California. Warren supervised and trained a staff of inspectors and performed inspections on literally hundreds of capital and new development projects, which included water main system upgrades, water main lining, construction of new reservoirs, seismic-retrofitting and water proofing of existing reservoirs, chlorination facilities, new meters, new and relocated fire hydrants, fire service/sprinkler system lines, irrigation systems and connections to private residences. Warren maintained as-built plans, daily reports, contract change order documentation, obtained permits from various cities and regulatory agencies, monitored traffic control, and maintained good public relations for the Company. Further responsibilities included loading and hydrostatic pressure testing the system, performing bacteria testing, enforcing NPDES requirements and monitoring final tie-in connections. Projects required pavement replacement, using conventional asphalt as well as rubberized asphalt concrete.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-15

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Inspection Services for Development and Capital Improvements, Elsinore Valley Municipal Water District
(EVMWD), Lake Elsinore, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for various projects that included earthwork, grading, water and sewer pipeline construction including trenching, backfill and compaction, water valves, blow-offs, fire hydrants, air/vacuum valves, manholes, sewer air release valves, water service line and sewer lateral construction, pavement and concrete removal and replacement, water pump station construction including footings and foundations, slabs, above and below ground piping, and other general water and sewer facility and appurtenance types of construction. Thomas was responsible for daily inspection reports, quality controls, quantity counts, progress payments, and submittals.

Project value was $250K.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Vallecitos Water District 11/Vista Irrigation District 12 Flow Control Facility (Task Order #01), San Diego County Water Authority, Escondido, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for this $797K project that included connecting the new facility to existing pipelines, rehabilitation of the existing Pipeline 1 and Pipeline 2 turnout structures, demolition of the existing VID 1/VAL 2 FCF building, and all other appurtenances. Other work included site grading and excavation. Thomas provided field inspection to ensure compliance with the Authority’s plans and specifications. He provided photo documentation; prepared daily reports, punch lists, notices of noncompliance; oversaw testing services; and maintained/reviewed the contractor’s as-built documents.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Thomas Michael, EIT Construction Inspector 19 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS, Civil Engineering, San Diego State University
AS, Engineering – Civil Emphasis, Southwestern College
EIT: CA No. 113487
The National Association of Sewer Service Companies
(NASSCO), Inspector Training & Certificate Program
(ITCP) for the Inspection of Cured-in-Place-Pipe (CIPP) Installations (CIPP-217-020196)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Thomas has 19 years of experience in public works infrastructure construction inspection and Storm Water Pollution Prevention implementation and inspection. Thomas’ roles have included Construction Manager, Resident Engineer, Inspector, and Office Engineer. He is proficient with daily inspections to validate all quality assurance and quality control functions conform to client and contract requirements. He is experienced supervising construction sites, field engineering, site work inspections, and work progress measurements; experienced in design, engineering, and construction of projects that encompass the contemplated tasks as anticipated for this contract. He also brings extensive experience in contract and construction administration for private and public contracts. Thomas supervises work tasks so that projects comply with contract documents, specifications, design blueprints, provincial/local and utility company standards and codes, and health and safety regulations standards. He is familiar with various construction methods (open cut, directional drilling, jack and bore); performed inspection services for roads, utility pipes (water, sanitary, storm, electrical and communications) installation, grading and drainage, and stormwater management facilities. He understands the importance of minimizing disturbances to business operations and to residents, and works seamlessly with clients and subconsultants to resolve issues before they become problematic, avoiding delays and/or cost overruns.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-16 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Inland Empire Brine Line Reach V Rehabilitation and
Improvement Project – Phase 1 and 2, Santa Ana
Watershed Project Authority, Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for Phase 1 which included inspection of approximately 27,000 LF of 24-inch PVC pipe with installation of approximately 23,000 LF of CIPP, construction of 19 maintenance access structures and replacement of fittings and appurtenances. A temporary bypass pipeline was constructed to divert brineline flow while CIPP rehabilitation activities were completed to allow for the Authority to remain in operation while construction activities were completed. Project value was $12.4M. Phase 2 included construction of approximately 5,100 LF of new 18-inch diameter IPS HDPE pipe, construction of four maintenance access structures, and associated fittings and appurtenances. Also included was the abandonment of the existing system. Project value was $1.9M. Thomas was responsible for inspection, completing daily inspection reports including photo documentation, and providing quality control.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection
Support Services, Moulton Niguel Water District,
Aliso Viejo, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for this on-call that included electrical work, startup and commissioning, linings and coatings, structural work, welding, and other general overflow inspections. Thomas provided inspection support to ensure compliance with plans and specifications for the District’s cured-in-place pipeline lining projects, manhole epoxy lining manhole rehabilitation projects, and well pump station rehabilitation. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection
(Contract #11A2479), Caltrans District 11, San Diego, CA PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for this $3M contract that included as-needed professional and technical services in support of District 11. Thomas provided services for various task orders to include day-to-day inspection of the contractor’s work, photo documentation, prepared daily reports, construction activity progress reports, and processed submittals. In addition, he was responsible for preparing punch lists, notice of noncompliance, maintaining as-built documents, and reviewing the contractor’s as-builts.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-17

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sewer System Rehabilitation Phase I - Sewer
Main Lining and Spot Repair Projects Nos. 3 and 4,
Garden Grove Sanitary District, Garden Grove, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for this project that consists of the rehabilitation of 23,000’ of 8- and 10” vitrified clay pipe (VCP) pipe by cured-in-place pipe (CIPP), manhole replacements, and installation of approximately 15 top hats.

Site challenges include work in high traffic zones, with close proximity to residential properties, businesses, and schools. The contractor encountered issues with the lining operation that extended past normal working hours, and Bill notified residents of work. He provided inspection for roadway work to include AC concrete, soil compaction, base placement, and slurry backfill, as well as water and sewer lines. He also provided traffic control for arterial and residential streets.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alley and Sewer Improvement Projects, City of Brea, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Civil Inspector provided services for the $1.5M installation of 1,000’ of sewer line and 1,000’ of trenchless pipe bursting and lining of PVC piping into older sewer line. Project elements included heavy civil, sub-grade work, public agency coordination, permitting, SWPPP, utility coordination, and as-built drawings. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Main Replacement Project South Grand Oaks Avenue and
Bonita Avenue, City of Los Angeles, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Special Inspector for the $1M installation of 350’ of 8” DIP, 3- 6” fire hydrant laterals and the installation of 110’ of 1” water service laterals off an 8” DIP to meter box. Project elements included sub-grade work, agency and utility coordination, permitting, safety, SWPPP, and contractor oversight. Bill provided construction observer and special inspector services.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Bill Fernandez Construction Inspector 32 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) General Studies, Orange Coast College RSO - Radiation Safety Officer Trench Shoring Safety Certification
Soil Gauge Certification

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Bill has worked on a variety of complex public works projects throughout his career, with increasing responsibility due to his high level of competence and professional demeanor. His key strengths include his extensive knowledge of soils conditions and his experience with Caltrans requirements for public works pipeline installations. As a veteran handling public relations for sensitive construction projects, he has provided guidance on high-profile projects, including major shutdowns for the Port of Long Beach and public works construction within private properties. His primary goal is to ensure that the contractor meets the requirements of the plans and specifications and he always strives to keep the client’s staff well informed of progress.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-18 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alley Water Main Conversion – Phase II, Long Beach
Water Department, Long Beach, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Civil Inspector for the $2.5M conversion of 170 private water mains and four tie-ins within the Caltrans jurisdiction of Pacific Coast Highway on pipelines for final tie-ins. Project elements included heavy civil, sub-grade work, structural system installations, permitting, SWPPP, Soil sampling and testing, utility coordination, and as-built drawings.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Public and Private Projects, Various Agencies, Various
Locations, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Soils Technician and Special Inspector on several major road projects, residential, commercial, and school projects for the cities of Costa Mesa, Irvine, Huntington Beach, Newport Beach, Brea, and Torrance; the Orange County Environmental Management Agency/Public Works, Assessment District; and Caltrans. The $1B in projects included post-grading, trench backfilling, sewer, water, storm drains and utility trenching. He supervised the structural section testing for bridges, dams’ deep foundations, and paved streets with Caltrans. He was also responsible for supervision and training of other technical and field personnel. Project elements included heavy civil, sub-grade work, structural system installations, permitting, SWPPP, soil sampling and testing, utility coordination, and as-built drawings.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-19

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sewer System Rehabilitation Phase I - Sewer
Main Lining and Spot Repair Projects Nos. 3 and 4,
Garden Grove Sanitary District, Garden Grove, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM QA/QC Manager for this project that consisted of the rehabilitation and CIPP lining of approximately 23,000 LF of 8- and 10” sewer mains, 511 service lateral reinstatements, installation of 25 top hat mainline-lateral interface structural seals and the temporary sewer bypass associated with the rehabilitation work. Mike provided both constructability and cost estimate reviews. In addition, serving as a subject matter expert for sewer rehabilitation projects, he reviewed CCTV to provide design suggestions concerning the types of rehabilitation to be used for the project.
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palos Verdes Golf Club, Recycled Water Lateral and Lago Seco Pump Station, West Basin Municipal Water District, Torrance, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM QA/QC Manager for this project that included the installation of approximately 18,631 LF of 10-, 8- and 4” C900 PVC, an 8” meter vault, blow-off valves, combination air release valves, in addition to a pumping station. As QA/QC Manager, Mike provided both design and constructability reviews. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Stream Restoration, Stormwater Pond and Outfall
Retrofit–Construction Management and Inspection
Services, Anne Arundel County Department of Public
Works, Anne Arundel County, MD
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM QA/QC Manager for this project that consisted of providing construction management and inspection services for the Class-B stream restoration, storm drain outfall and stormwater management facility retrofit sites throughout the northern and southern regions of the County. Mike provided document control assistance, and as a Procore “super user,” set up each assigned task as a separate project in order to effectively manage accordingly.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Mike Trail, CCM Civil Engineer 35 2

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) General Studies, Prince George’s Community College Certified Construction Manager, CMAA Competent Person for Excavation Trenching and Shoring
Hazard Communication and Global Harmonization
Systems
Personal Protective Equipment
Procore Certified - Project Manager: Quality & Safety, Core Tools, Administration and Financial Management

NASSCO PAC, LACP, MACP

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mike is a Certified Construction Manager and NASSCO Certified Inspector with over 35 years of water infrastructure engineering and construction management experience. Mike has administered and coordinated water utility and facility construction projects nationwide. Prior to joining Gannett, he had a 30-year career with the Washington Suburban Sanitary Commission, serving as the construction manager for the water main replacement and sewer consent degree programs.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-20 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fire Hydrant Rehabilitation Phase 26 - Construction
Management Inspection Services, Anne Arundel County
Department of Public Works, Anne Arundel County, MD
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Construction Inspector for the painting of fire, hydrants at various locations throughout Anne Arundel County.

He also ensured that work was performed efficiently, effectively, safely and in accordance with the project specifications.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED St. Margarets Road & Old Mill Bottom Road Water Main
Replacement, Anne Arundel County Department of Public
Works, Anne Arundel County, MD
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Assistant Construction Manager for the $1.9M project providing construction and inspection services for the installation of 7,674 LF of 12-inch PVC water main, which includes the jack and bore of approximately 250 LF under Route 50 and the installation of 60 WHC’s.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-21

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Construction Management and Inspection
Services for Water Distribution Conveyance, Santa Clarita Valley Water Agency (SCVWA), Santa Clarita, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Program and Construction Manager/Resident Engineer responsible for the coordination of deliverables to the Agency, daily document control efforts, processing contract change orders, progress payments, conducting meetings and producing meeting minutes, review of RFIs and submittals in accordance with the specifications, coordination of field issues with agency staff, coordination and scheduling of field inspectors and materials testing, survey and stakeholders along with completion of project closeout requirements including punchlist completion, operation and maintenance manuals, and lien releases. Jennifer provided services for the following projects:
• PFAS Groundwater Treatment and Well Q2 Perchlorate Removal Facility ($8.1M). • Magic Mountain Parkway Phase 6a B&C Review ($4.6M).
• Mission Village 01A/01C Water Systems Improvements Project – Development Staff Augmentation ($7M). • CL118A Bouquet Canyon Road Pipeline, Groundwater Containment, Treatment & Restoration ($5.5M). • CL118B Groundwater Production, Restoration, Transmission Mains ($13.3M). • Rio Vista Treatment Plant Expansion ($37M).
• Earl Schmidt Chemical Storage and Delivery Project ($488K). • Newhall Lateral Reach 2A Modifications ($188K).
• Newhall Lateral Reach 2B Facility Modifications ($440K). • Foothill Feeder Turnout Structure ($2.9M).
b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Eastside Water Treatment Plant Expansion and Brine Line, City of Chino, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Client Liaison and Grant Funding Compliance Manager responsible for maintaining client contact, managing the budget, and providing as-needed quality assurance and quality control reviews. The $15.5M project expands the City’s Eastside Water Treatment Facility (EWTF) from 3,500 gallons per minute (GPM) to 7,000 GPM. Project elements include a booster pumping station, booster pumps, two storage reservoirs totaling 4.5 MG capacity, and two separate brine pipelines to convey backwash and softener waste from the EWTF to a Santa Ana Watershed Project Authority lateral owned and operated by the Inland Empire Utilities Agency.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Jennifer Saldivar, CPM Grant Management/
Document Control
16 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Certified Project Manager The National Association of Sewer Service Companies (NASSCO), Inspector Training & Certificate Program
(ITCP) for the Inspection of Cured-in-Place-Pipe (CIPP) Installations (CIPP-217-020196)
California Notary Public

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Jennifer has more than 16 years of experience with groundwater treatment, water treatment plants, water systems, and pipeline projects, providing construction management and contract administration/project controls, emphasizing project management, document control, and grant management. Jennifer brings significant experience managing multiple projects and contractors while overseeing staff, budgeting, subconsultant contracting, and client satisfaction.

She is experienced managing SRF funded projects and understands the importance of complying with requirements in order to maintain funding and obtain disbursement in a timely manner.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-22 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Multiple Projects, Elsinore Valley Municipal Water District, Lake Elsinore, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Program and Construction Manager/Resident Engineer responsible for coordinating deliverables to the District, daily document control efforts, contract change orders, progress payments, conducting meetings, and producing meeting minutes. Her role also involved review of RFIs and submittals under the specifications, coordination of field issues with District staff, coordination and scheduling of field inspectors and materials testing, survey and public relations subconsultants, along with completion of project closeout requirements including punch list completion, operation and maintenance manuals, and lien releases. Jennifer provided services for the following projects:
• On-Call Inspection Services for Development and Capital Improvements ($250K). • Water System Improvements in Lakeland Village ($637K). • Water System Improvements in Country Club Heights ($1M). • Repair of 19 Bolted Reservoirs ($498K).
• Pottery Street Sewer ($1M).
• Repairs to 15 Manholes ($134K).
• Relocation of the Sewer in San Joaquin Drive West ($550K). • County Water Company of Riverside - Final Water Improvements ($287K). • Regional Agricultural Pipeline Conversion ($1M).
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Inland Empire Brine Line Reach V Rehabilitation and
Improvement Project – Phase 1 & 2, Santa Ana Watershed
Project Authority, Corona, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2017
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Assistant Construction Manager/Office Engineer for this project that included two phases. Phase 1 included inspection of approximately 27,000 LF of 24” PVC pipe with installation of approximately 23,000 LF of curedin-place-pipe (CIPP), construction of 19 maintenance access structures and replacement of fittings and appurtenances. A temporary bypass pipeline was constructed to divert brineline flow while CIPP rehabilitation activities were completed to allow for the agency to remain in operation while construction activities were completed. Project value was $12.4M. Phase 2 included construction of approximately 5,100 linear feet of new 32-inch diameter IPS HDPE pipe, construction of four maintenance access structures, and associated fittings and appurtenances. Also included was the abandonment of the existing system. Project value was $1.9M. Jennifer assisted with coordination of deliverables for the construction manager, daily document control efforts, processing of contract change orders, progress payments, meeting minutes, RFIs and submittals in accordance with the specifications and completed project closeout requirements including punchlist completion, operation and maintenance manuals and lien releases.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Multiple Projects for South Archibald Plume Clean-Up,
Chino Basin Desalter Authority, Chino, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Program and Construction Manager/Resident Engineer responsible for management of project team, consultant budgets, subconsultant contracts and budgets, individual project pre-bid documentation preparation, contract bid award and compliance verification, project audits and client satisfaction. The $25M South Archibald Plume CleanUp Project (SAPCP) is a comprehensive program to mitigate contamination and excessive levels of Trichloroethylene (TCE) and other Volatile Organic Compounds (VOCs) and toxins identified through local groundwater monitoring.

The improvements were performed under five separate phases to complete installation of the raw water pipeline from the new Well Facility II-12 through the Cities of Ontario, Eastvale and Jurupa Valley to the CDA Chino II Desalter facility where the raw groundwater is treated through a modified RO system.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-23

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sixth Street Viaduct Replacement, City of Los Angeles, CA PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Project Scheduler on joint-venture team responsible for multiple aspects of the $260M project’s resourceand revenue-loaded project schedule. Created and updated schedules including finalizing schedule, narrative, and project reports and plots. Each narrative report was over 1,000 pages after importing all plots and reports.

Developed multiple Time Impact Analysis (TIA) schedules to document impacts to project. Worked closely with jointventure team to assist with finalizing project’s revised Baseline schedule; participated in and led project schedule meetings with key personnel to develop TIA schedules; and assisted with developing revised Baseline schedule. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Design-Build Contract for Construction Packages 2-3,
California High-Speed Rail Authority, Various Locations, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Senior Project Scheduler on joint-venture team responsible for multiple aspects of the $1.5B project’s resourceand revenue-loaded project schedule. Developed TIA schedules for multiple issues on the project. Also developed interview questions and conducted interviews with lead scheduler. This allowed joint-venture team to locate and hire permanent scheduler for project. Worked closely with joint-venture lead scheduler; developed two different revised Baseline schedules; participated in and led project schedule meetings with key personnel to develop TIA schedules; and assisted with developing revised Baseline schedules. Developed “what if” TIA schedules to forecast potential project impacts.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Quint Street Bridge Replacement, Peninsula Corridor Joint Powers Board (Caltrain), San Francisco, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM As Senior Project Scheduler, reviewed contractor’s Baseline, Update, and TIA schedules for $5M bridge replacement project. Conducted meetings with contractor to resolve issues associated with schedules.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Jim Gallego, PE Scheduler 34 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS, Civil Engineering, Texas A&M University PE: CA (Civil) - No. 55575

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) As Senior Scheduler, Jim develops preliminary, initial and progress schedules, cost and labor resource-loaded schedules, and recovery and claim schedules when required. Conducts time impact analyses. Writes narrative, schedule, activity, and logic reports showing earning by CLIN. Creates cash flow/schedule variance control diagrams. Integrates contractors’ schedules into master CMP schedules and develops and maintains detailed Critical Path Method project schedules with loaded resources. Coordinates with project management for schedule updates. Develops quantity takeoffs, estimating and budgeting reports, and schedules for proposals. Coordinates and attends project walkthroughs and pre-bid meetings; contributes to bids and proposals; and defines detailed scopes of work. Participates in preconstruction, procurement, expediting tasks, and constructability reviews. Manages transportation and design-build projects for various clients, interacts and coordinates with clients’ representatives, and works with project staff and management. Software skills include Oracle Primavera P6, Primavera Project Planner (P3), and SureTrak 3.0 scheduling software
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-24 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED San Mateo Bridges Replacement, Peninsula Corridor Joint Powers Board (Caltrain), San Mateo County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM As Senior Project Scheduler, reviewed contractor-developed Update and TIA schedules for the $10M bridge replacement. Conducted meetings with contractor to resolve issues associated with Update and TIA schedules.

Developed Caltrain “what if” TIA schedules to forecast potential project impacts. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Summit Reservoir and Shasta/Woods Pumping Plant
Replacement, East Bay Municipal Utility District, Contra Costa and Alameda Counties, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2018
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM As Senior Project Scheduler, developed Baseline and Update schedules for the $15.9M project. Work included constructing a temporary 0.4-million-gallon bolted steel tank, demolishing the existing Summit Reservoir, Shasta/ Woods Pumping Plant, constructing a 3.5-million-gallon prestressed concrete tank, site grading, access roads, retaining walls, site paving, and drainage improvements. Work also included constructing 6 to 30-inch water distribution pipelines, a new Summit Reservoir, Shasta/Woods Pumping Plant, three 1.4 million gallon per day vertical turbine pumps, motor control equipment, related piping, valves, flow meter, and other mechanical and electrical systems. Used Primavera P6 to develop resource- and revenue-loaded Baseline and Update schedules.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-25

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-680/Stoneridge Drive Interchange, Costco Wholesale,
Pleasanton, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Structures Representative for this $20M freeway on-ramp bridge connecting Stoneridge Drive to I-680 Northbound.

The Costco-Stoneridge interchange project will widen the existing Alamo Canal Bridge to add one additional 12’ lane. The project includes the construction of a triple-span, 230’ long cast-in-place post-tensioned concrete bridge with 90-foot diameter by 80-foot long wet CIDH piles, and Class 200 precast concrete driven piles at Abutment 1 and 4. The project also includes the construction of approximately 100 feet of sheet-pile retaining wall and 500 feet of type 1 concrete retaining wall. The Alamo Canal Bridge is in the State right-of-way; therefore, all construction work is per Caltrans Standards, with all documentation per the State Local Assistance Procedures Manual (LAPM).

This project requires coordination with various stakeholders such as Zone-7 Water Agency, City of Pleasanton, and Alameda County. The rest of the project includes roadway improvements on Stoneridge Drive from Johnson Drive to I-680; reconfiguring the signalize intersection at Stoneridge / Johnson Drive, city street, curb/gutter/sidewalk, bike lane, soundwall, and landscaping construction. Responsible for the review of submittals, responses to RFIs, preparing contract change orders, review of progress payments, construction surveys, and coordinating with the design consultants.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Kittijuk “Kitt” Tongthaworn,

PE, SE, QSD/P, LEED AP
Structural Engineer/
Constructability Review and
Value Engineering
24 <1

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) MS, Civil Engineer, California State University, San Jose BS, Civil Engineering, California State University, San Francisco
PE: CA (Civil) - No. 60765
SE: CA (Structural) - No. 5222
Qualified Storm-water Developer
(QSD/P), No. 60765
CPR and First-Aid No. CBA9CE
LEED Accredited Professional

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Kitt has 24 years of experience providing civil engineering, structural engineering, and construction management services for bridge and highway projects designed and constructed to the standards of Caltrans and the Federal Highway Administration. Kitt has extensive experience in construction oversight. He provides pre-construction, construction, and post-construction services, including review of plans and specifications, constructability analysis, engineer’s cost estimates, value engineering, construction administration, interpretation of CPM schedules, construction schedule monitoring, construction inspection, quality assurance/quality control, utility coordination and relocation, development of punch lists, as-built drawings, and analysis of claims and project close-out. He brings a proven collaborative style of management to create partnering environments, develops dynamic and creative approaches to achieving on-time and on-budget results, while managing multiple projects at multiple sites.

Kitt is experienced in reviewing submittals, including shop drawings, product data, samples, test samples, quality control plans, work plans, materials sources, test data and test results, and evaluation reports, as required by the contract and/or submitted by the construction contractor; enforcing compliance with applicable regulations controlling the work being inspected, including Cal/OSHA, Federal Highway Administration, and OSHA regulations; performing calculations (stress and deflection) of temporary structures as used in the construction of bridges (falsework, temporary shoring, working platforms, temporary supports); construction of temporary and permanent structures; stress analysis, strength, properties and uses of construction materials; mathematics as applied to civil engineering; and methods, materials and equipment used in construction and maintenance of transportation structures.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-26 b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 25th Avenue Grade Separation and San Carlos Transit
Center, Peninsula Corridor Joint Powers Board/Caltrain, San Mateo, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Structure Representative/Resident Engineer for the $87M 25th Avenue Grade Separation project that involved construction of six railroad bridges – one steel girder bridge and five precast/prestress girder bridges. All the structures are on CIDH pile foundations. The project also involved construction of MSE walls. The San Carlos Transit Center project involved construction of 110-foot-long retaining wall, reconstruction of the station parking lot, construction of a new signalized intersection, construction of pedestrian pathways that connect directly to the new transit village, underground utility relocations, paving, and concrete flatwork. Kitt was responsible for review of submittals, responses to RFIs, preparing contract change orders, review of progress payments, construction surveys, and coordinating with the design consultants.
c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Tuolumne River Bridge Rehabilitation, Caltrans District 10, Jamestown, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Structures Representative for this $16.5M project that included the complete replacement of the James E. Robert Memorial Bridge deck. The six-span 1,400-foot-long bridge crosses the Tuolumne River and the Don Pedro Reservoir. Work also included the replacement of the bridge bearings and strengthening of the existing steel plate girders. Kitt was responsible for the constructability review, responding to RFIs, submittals review, preparing contract change orders, progress payments, and construction surveys. d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED State Route 4 Crosstown Viaduct, Caltrans District 10,
Stockton, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2016
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Assistant Structures Representative for this $60M project that included the construction of two, 21-span, 2,850-footlong precast/prestressed concrete girder viaducts extending State Route 4 at the Port of Stockton. Because the twin bridges span over BNSF, UPRR, and Port of Stockton rail lines, complex coordination between multiple stakeholders was required. Unique features of the project included the installation of 100-foot long, 9-foot-diameter CIDH piles in railroad right-of-way, post-tension bent cap, and triple crane pick girders erection. Responsible for constructability review, responding to RFIs, submittals review, preparing contract change orders, progress payments, and construction surveys.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Silva Valley Interchange, County of El Dorado, El Dorado Hills, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Structures Representative for this $40M project that included construction of four bridges with span lengths of up to 200 feet and widths of 110 feet; construction of RCB culverts; and Type 1 and MSE retaining walls. Responsible for constructability review, responding to RFIs, submittals review, preparing contract change orders, preparing progress payments, construction surveys, and coordinating with the Caltrans Office of Structure Design, Materials Engineering and Testing Services (METS), and design consultant and contractors.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-27

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lakes Nora and Grace Dam Embankment Repair,
Confidential Client, Shasta County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Design Engineer and Project Manager for embankment repairs at both Lake Nora and Lake Grace in Shasta County, CA. Both embankments were originally constructed in the early1900s and generally are homogeneous earthfill dams. Recent inspections have noted significant muskrat activity within the embankments resulting in settlement, erosional scarps, and the potential for through seepage and piping related failures. The team prepared design drawings and specifications for muskrat den repair, developed exclusion details, and plans for raising the embankments to their respective original design heights. Provided engineering support during the permitting and construction phases of the project, including site visits during construction to ensure conformance with the design intent, answering questions during design and providing design changes as needed. Provided support with interactions with FERC, including preparation of a final construction report. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Upper Blue Lake Dam, Seismic Retrofit Project,
Confidential Client, Alpine County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Design and Geotechnical Engineer for an upstream rock fill buttress to mitigate seismic hazards to the dam related to liquefaction of the foundation materials. The project included an investigation of the existing conditions of the dam, performing analyses to determine the seismic vulnerabilities and anticipated deformations, and designing a stability buttress on the upstream face of the dam to mitigate against the potential hazard. To allow for construction of the buttress, the existing intake structure had to be demolished and a new one constructed further upstream, which required an analysis to confirm the DSOD draw-down criteria was met. Specific responsibilities included managing the project, staffing, and design efforts, performing senior-level technical design and quality assurance/quality control (QA/QC) for design components, led the preparation of construction documents including plans and technical specifications, and coordinating with the client, project stakeholders, and state (DSOD)/federal (FERC) regulators throughout the design process. Also provided engineering support during the construction operations, documenting the as-built repairs into final drawings, and assistance with preparing FERC construction reports.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Jerry Pascoe, PE, GE Geotechnical Engineer 26 10

15. FIRM NAME AND LOCATION (City and State)
Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS, Civil Engineering, California State University,
Sacramento
PE: CA (Civil) - No. 58156
GE: CA (Geotechnical) - No. 2613

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Jerry is a Principal Geotechnical Engineer providing geotechnical and civil engineering services that include geotechnical investigations, consultations, and designs for various projects including roadways, pipelines, solar and cell phone installations, dams, water conveyance systems, water tanks, bridges, parks, schools, military facilities; commercial, industrial, and retail complexes; and residential. Manages projects from preliminary design through construction including scope and cost development; preparation of preliminary design reports; preparation of plans, specifications, and cost estimates; construction observation services; installation and monitoring of geotechnical instrumentation; and materials testing and inspection. Supervises engineering staff, field technicians, inspectors, and subconsultants/subcontractors. Also specializes in foundation and retaining wall design, settlement analysis and monitoring; mitigation of expansive soils; slope stability and deformation analyses; landslide evaluations and mitigation, geotechnical instrumentation and monitoring; forensic investigations including crack and settlement monitoring; pavement evaluations and design; and liquefaction studies.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-28 c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Merced Falls Dam, Confidential Client, Merced County, CA PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Geotechnical Engineer providing onsite engineering oversight during crest restoration grading. A portion of the dam is a 43-foot-high earthen embankment that has a clay core flanked with river cobbles and a sheet pile wall through the core as an additional seepage barrier. The crest of the dam had experienced localized settlement over time that required additional fill to restore the freeboard. Responsibilities included observation and documenting of subgrade preparation, confirming imported fill meets the required specifications, and placement of fill to the required grades. Fill was placed using a method specification; compaction testing was not performed due to the open-graded granular nature of the fill.
d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Lower Blue Lake Dam, Confidential Client, Alpine County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Geotechnical Engineer supporting the development and implementation of a geotechnical field investigation at Lower Blue Lake Dam to evaluate historic through seepage. The scope included site characterization, liquefaction assessment, and slope stability and deformation analyses for the facility. Responsibilities included technical support during development of the drilling program plan and obtaining FERC approval, the field investigation, and the analysis and reporting. The field investigation consisted of cone penetrometer tests, direct push sampling, installation of vibrating wire piezometers, and exploratory borings through rock and soil. The embankment characterization included developing shear strength parameters using various correlations and strength test data, accounting for impacts due to gravel fractions and post-liquefaction residual strengths. The potential for seismically-induced deformations were evaluated using simplified, semi-empirical procedures based on Newmark sliding block theory.
e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Relief Dam Throughflow and Stability Analysis,
Confidential Client, Tuolumne County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Geotechnical Engineer for performance of a throughflow analysis to analyze the impact of flowing water through the downstream rockfill shell due to a PMF overtopping event and stability of a stacked rock wall at the downstream toe of the dam. Specific responsibilities included technical support and review of the throughflow analysis which required the estimation of the rockfill gradation using the Wolman Count methodology (FHWA). This was facilitated by reviewing LiDAR data and using field measurements to estimate the median (D50) rock size. Additional responsibilities included performing a static and seismic stability analysis of the stacked and mortared rock wall both under normal conditions and hydrostatic loading during a PMF event.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-29

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED On-Call Materials Sampling and Testing Contract
#12A1887, Caltrans District 12, Orange County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Serves as Project Manager providing as-needed materials testing services to support the construction of various State transportation projects in Caltrans District 12. Field services include batch plant inspection, in-place density testing, and sampling and testing of concrete, asphalt concrete, subgrade and aggregate base. Laboratory testing services include, but are not limited to, California Impact Test (CT 216), Durability Index (CT 229), R-Value (CT 301), Determination of Asphalt Content (CT 382), and Method of Test for Relative Compaction of Polymer Concrete (CT 554). Testing services are being performed in general accordance with Caltrans Test Methods and requirements. b.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Route 210 Soundwall Construction, Phase III, La Canada
Flintridge, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
In Progress
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Serves as Project Manager providing materials sampling and testing services for the Route 210 Soundwall Construction – Phase III Project. The project consists of constructing three block soundwalls on Route 210 in the City of La Canada Flintridge. Ninyo & Moore’s services include, but are not limited to, density testing on subgrade, aggregate base, trench and structural backfill, and asphalt concrete. Laboratory testing services include, but are not limited to, maximum density, sieve analysis, sand equivalent, durability, and R-value on soils. Compressive strength testing for concrete, grout and mortar and Hveem stability, unit weight, and percentage asphalt content and extracted gradations for asphalt concrete. Ninyo & Moore Fees: $95,000. c.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pacific Coast Highway / Hawthorne Boulevard
Intersection Improvements, Torrance, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2022
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Served as Project Manager providing materials sampling and testing services for the Pacific Coast Highway (PCH) and Hawthorne Boulevard Intersection Improvements Project. This project consisted of widening the intersection of PCH and Hawthorne Boulevard. Services included, but were not limited to, density testing on pavement subgrade, aggregate base, trench and structural backfill, and asphalt concrete. Laboratory testing services included, maximum density, expansion index, plasticity index, chloride and sulfate content, pH and resistivity, sieve analysis, sand equivalent, durability, and R-value on soils. Ninyo & Moore Fees: $77,000.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE A. TOTAL B. WITH CURRENT FIRM
Randy Reichert Materials Testing
Project Manager
31 1

15. FIRM NAME AND LOCATION (City and State)
Ninyo & Moore - Irvine, California

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) AA, Mechanical Design
General Education & Mathematics, Rancho Santiago
College
General Education & Diesel Mechanics, Golden West
College
Radiation (Nuclear Gauges) User Safety
California Test Methods: 105, 106, 125, 201, 202, 205, 206, 207, 211, 213, 214, 217, 226, 227, 229, 234,
235, 304, 308, 309, 367, 370, 382, and 384
AASHTO Test Methods: T 11, T 27, T 84, T 85, T 96, T 166, T 176, T 209, T 210, T 248, T 255, T 269, T 275, T 304, T 308, T 329, T 335, R 47, R 76, and ASTM D 4791

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) As a Project Manager for Ninyo & Moore, Randy provides in-depth knowledge in testing methods, inspection, and standards relating to concrete and hot mix asphalt (HMA) production and placement operations. Has extensive experience working on state and interstate highway transportation projects.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE E-30 d.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Job Mix Formula Reviews (Hot Mix Asphalt) & Mix Design
Reviews (Concrete), Caltrans District 12, Orange County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Reviewed contractor’s proposed HMA, RHMA, and OGFC Job Mix Formulas (JMF’s) for compliance. Additionally, reviewed contractor’s proposed miscellaneous HMA (dike, berm, MVP’s and gore areas), ATPB and slurry seal mix designs. Concrete mix design reviews include structures concrete, (bridge decks, walls, footings, piers/columns, approach slabs, shotcrete, CIDH piles, sound wall grout, soil nail grout and structures and rapid strength concrete).

Incorporated in-depth knowledge and reference of the Standard Specifications, American Concrete Institute (ACI) Concrete Mix Design Manual and Asphalt Institute (AI) Asphalt Mix Design Methods. e.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Administer Caltrans’ Material Plant Quality Program,
Caltrans District 12, Orange County, CA
PROFESSIONAL SERVICES CONSTRUCTION (if Appl.)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE CHECK IF PROJECT PERFORMED WITH CURRENT FIRM Served as Weights and Measures Coordinator for Caltrans District 12. Approved concrete and asphalt production facilities for projects. Traveled to facilities and conducted inspection to ensure their compliance with all Caltrans requirements. Notified operators of any deficiencies. Also inspected for safety requirements, per Cal-OSHA regulations.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE F-1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY NUMBER
1 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if appl.)
On-Call Engineering Services (2015 - 2022), Phoenix, AZ In Progress In Progress

23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NO.

City of Phoenix Allan J. Smolko, PE 602.256.4337

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Gannett Fleming, Inc. Irvine, California Construction Management Work under this on-call contract includes construction administration services and assistance with the City’s pavement preservation program.

Gannett’s role includes providing up to two engineering staff to assist City personnel with contractor oversight for the City’s Pavement Preservation Program. Work includes field work, program and contract management and project level reviews. Gannett provided construction support after design for the specialized construction of cell tower foundations atop North Mountain. Support included RFI response, submittal reviews, and specialized geotechnical review and recommendations based on the extreme slope and rocky terrain of the area. Task orders include the following:
• Phoenix Convention Center Shoring Inspection: Entered tunnel to assess the condition of structural components, and provide repair recommendations for the building’s south-face basement soil shoring system; the shoring system is approximately 40 feet tall by 700 feet long and consists of cable tie-backs and anchorage, wood planking, and steel bolting.
• Rental Car Center (RCC) Expansion Joint Rehabilitation: Provided recommendations and construction inspection services for repairing deteriorated expansion joints throughout the rental car garage; inspection work was conducted at off-peak hours to limit disruption to operations. • PSHIA Bridge Maintenance Program – Phase III: Assisted in the prioritization of the continued bridge repair program at PSHIA, including preparation of repair plans for the Taxiway Romeo slope drainage, tracking and monitoring bearing pad replacements at the T4 Concourse Bridges. • Phoenix Bridge Maintenance Programs – Phase III: Provided construction inspection and oversight support for bridge repair and maintenance program at PSHIA; oversaw the bearing replacement work at the Terminal 4 Concourse, Connector Bridges and anticipated future deck joint, concrete, railing and Taxiway Romeo Drainage Repairs.
• Margaret T. Hance Park Engineering Study: Reviewed as-builts for the Deck Park tunnel and park site, confirmed load restrictions, provided analyses, produced guidelines and restrictions for event planning, produced map of soil depths based on available data.
• McDowell Road Monument Structure Inspection: Inspected and assessed the monument structure, and recommended needed maintenance and areas of concern.

Project Similarities
• Construction/Project Management
• Construction Inspection,
Observation and Assessment
• Design services (structural, civil,
geotechnical); and bid documents
(PS&E)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE F-2 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY NUMBER
2 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if appl.)
Sewer System Rehabilitation Phase I - Sewer Main Lining and Spot Repair Projects Nos. 3 and 4, Garden Grove, CA In Progress In Progress

23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NO.

Garden Grove Sanitary District Liyan Jin 714.741.5977

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Gannett Fleming, Inc. Irvine, California Construction Management, Inspection, Engineering
Work consists of the rehabilitation of 23,000’ of 8- and 10” vitrified clay pipe (VCP) pipe by cured-in-place pipe (CIPP), manhole replacements, and installation of approximately 15 top hats. Site challenges include working in high traffic zones, with close proximity to residential properties, businesses, and schools.

The Gannett team was selected to provide engineering services to further evaluate alternatives, prepare a preliminary design report, and develop contract documents for a turn-key project delivery to repair and rehabilitate the identified segments.

The team is currently providing inspection for roadway work to include AC concrete, soil compaction, base placement, and slurry backfill, as well as water and sewer lines. The team is also providing public outreach and traffic control.

Project Similarities
• Construction/Project Management
• Construction Inspection,
Observation and Assessment
• Civil Engineering
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE F-3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY NUMBER
3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if appl.)
Building 19 Renovation Project, San Luis Obispo, CA In Progress In Progress

23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NO.

California Polytechnic State University,
San Luis Obispo
Mike McCormick, AIA 805.756.2100

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Gannett Fleming, Inc. Irvine, California Project Management and Document Control
The project itself consists of renovation of the existing dining hall built in 1926 which is being reconfigured to building a student-centric dining hall as a food court type concept with outside vendor sites such as Chickfil-A and Panda Express. When complete, the new complex will include nine separate dining venues housed in a building that took design inspiration from the Ferry Building in San Francisco, Chelsea Market in New York, and Krog Street Market in Atlanta.

The Gannett team is providing program management for claims review and assistance for the construction of the Building 19 Dining Hall renovation, CMAR contract. Gannett is assisting the University by providing owners representation with the CMAR team ensuring resolution to claims and change orders and response follow through of outstanding items to advance the construction schedule.

Project Similarities
• Project Management
• Document Control
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE F-4 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY NUMBER
4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if appl.)
On-Call Construction Management Services, Pleasanton, CA 2021 2021

23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NO.

Livermore Amador Valley Transit
Authority (LAVTA),
Jennifer Yeamans 650.508.7790

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Gannett Fleming, Inc. Irvine, California Construction Management The Livermore Amador Valley Transit Authority (LAVTA) is the local transit system in the Dublin / Pleasanton / Livermore area of the East Bay. It has major hubs at the Livermore Transit Center and the East Dublin / Pleasanton and West Dublin / Pleasanton BART stations, with scheduled time-transfers between buses and to and from BART trains.

Gannett provided construction management services to develop LAVTA bus stops in Pleasanton. The 20 refurbished and new bus stops will provide aesthetic and sustainable improvements, including new LED lighting, new bus shelters, LED bus route signage, solar power, LAVTA decorative pole-mounted signage, landscape, irrigation, ADA, and site amenities. These upgrades will add essential amenities to improve the transit experience, including premium rapid-style passenger shelters, enhanced lighting, real-time signs, benches, trash cans, and bicycle racks. The new shelters will complement the premium Rapid bus service now operating along the corridor between downtown Pleasanton and the Dublin/Pleasanton BART Station.

The primary funding source for the project was $1.4M in Measure B funds awarded by Alameda County Transportation Commission (Alameda CTC) and $212,000 in local Transportation Development Act funds.

Project Similarities
• Construction Management
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE F-5 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY NUMBER
5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if appl.)
On-Call Engineering Services, Redwood City, CA 2018 2018

23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NO.

San Mateo County Transit District
(SamTrans)
Brian Fitzpatrick 650.508.7781

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Gannett Fleming, Inc. Irvine, California
Construction Management,
Construction Inspection, and
Constructability Review
Gannett provided on-call multi-disciplinary engineering, design, architectural, and construction management support services to San Mateo County Transit District (SamTrans). This work included improvements to bus facilities, yards, stations, and District administrative offices for 10 years through two consecutive on-call contracts.

Services included engineering studies, civil/site improvement designs, mechanical, electrical equipment analysis/design, architectural/space planning, structural design and analysis, constructability review, and project cost estimating.

Specific tasks have included:
• Design and construction of San Carlos Transit Center Parking Lot Expansion. • Design of upgrade replacement emergency generator at North and South Base Maintenance Facilities. • Design of Fire Alarm upgrade for Central, South Base, North Base and Brewster Base Design and Integration Management of Central Security Control Room Upgrade.

Gannett also assured the quality of work by implementing specific quality assurance and control procedures that were further verified by the Project Principal/Quality Manager.

Project Similarities
• Construction Management
• Construction Inspection
• QA/QC Review
• Constructability Review
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE F-6 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)

20. EXAMPLE PROJECT KEY NUMBER
6 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if appl.)
Pavement Preservation Program, Phoenix, AZ In Progress In Progress

23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER B. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NO.

City of Phoenix Ryan Stevens, PE 602.489.0611

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Gannett Fleming, Inc. Irvine, California
Construction Management,
Construction Inspection, and
Constructability Review
Gannett has provided field inspection and office engineering support to assist City staff in the execution of the City of Phoenix’s Pavement Preservation Program (PPP), performing the following tasks:
• Provide contractor oversight for sidewalk and roadway upgrade and repair projects.
• Provide oversight of field work on sidewalk upgrade and repair projects at various sites around the City to ensure construction meets City standards and to inspect ADA ramp tolerances of the finished upgrades and repairs.
• Inspect and certify mill and overlay pavement thicknesses and compare field products to approved submittals.
• Identify and prioritize ADA ramp upgrades at all intersections within the City of Phoenix. • Provide full-time staff to support the City of Phoenix’s Accelerated Pavement Maintenance Program.

This program includes the repaving of over 250 miles of Arterial Roadways – a 300% increase in the City’s historical pavement maintenance program. The street repaving requirements within the program are being prioritized and executed through a Pavement Management System (PMS) Methodology that Gannett Fleming staff helped to develop and are currently implementing. The foundation of the PMS is filed data created from a specialized van, the Automated Road Analyzer (ARAN). The ARAN is equipped with cameras, sensors, and specialized computer software to evaluate roughness, smoothness, cracking and rutting as it travels along with the flow of traffic. The data created from the ARAN is then downloaded by the Gannett field personnel who verify the recommended roadway treatments from the ARAN, project the anticipated roadway conditions at the anticipated year of funding and provide expert input for prioritization of each roadway segment into the program. Additionally, Gannett staff work to coordinate roadway repaving requirements with other capital improvement and repair projects in the area to eliminate duplication of effort and maximize limited pavement maintenance funding. • Pavement Maintenance Treatments used in the City Pavement Maintenance Program include crack sealing, microsurfacing, slurry sealing, fractured aggregate surface treatment, polymer modified master seal, asphalt patching, and pothole repairs.

Project Similarities
• Construction Inspection
• Office Engineering
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE G-1 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS

26. NAMES OF KEY

PERSONNEL
(From Section E, Block 12)

27. ROLE IN THIS CONTRACT
(From Section E, Block 13)

28. EXAMPLE PROJECTS LISTED IN

SECTION F
(Fill in “Example Projects Key” section below before
completing table.

Place “X” under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Mike Broadwater, CPESC, QSD/P,
ToR Project Manager/NPDES Support
Ed Durazo, CCM, CPM Principal-in-Charge/CIPP Technical Advisor X X Michael Yepiz
Deputy Project Manager/
Resident Engineer/Construction Manager/
Construction Inspector
Maurice El-Hage, PE Resident Engineer/Construction Manager/ Constructability Review and Value Engineering
Shu-Jon Mao, PE, QSD/P Resident Engineer/Construction Manager Kitt Tongthaworn, PE, SE, QSD/P,

LEED AP
Resident Engineer/Construction Manager
Structural Engineer/ Constructability Review
and Value Engineering
X
William Saumier, MPM Resident Engineer/Construction Manager/ Construction Inspector X
Mary Jo Bachini Resident Engineer/Construction Manager X Warren Williams Construction Inspector
Bill Fernandez Construction Inspector X
Thomas Michael, EIT Construction Inspector
Rhodie Lumanog, CMIT Construction Inspector
Clint Pittman Construction Inspector
Greg McDowell Electrical Inspector
Philip Klinkon, AIA Architect
Martin Ramirez, Jr., RA, AIA, NCARB Architect
Mike Trail, CCM Civil Engineer X
Derek Smith, PE, ENV SP Civil Engineer
Stewart Vaghti, PE, CFM, ENV SP,
LEED AP Civil Engineer
Brendan Wesdock, MCP, GISP GIS Support
Ted Keane, ENV SP CADD
Tim Fettig, PLS (Guida Surveying) Surveyor
Byron Dixon Constructability Review and Value Engineering/ Pavement Management X X X
Phil Pollock, ACI Pavement Management

29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (From Section F) NO. TITLE OF EXAMPLE PROJECT (From Section F) 1 On-Call Engineering Services (2015 - 2022) 6 Pavement Preservation Program 2 Sewer System Rehabilitation Phase I - Sewer Main
Lining and Spot Repair Projects Nos. 3 and 4 7
3 Building 19 Renovation Project 8
4 On-Call Construction Management Services, LAVTA 9
5 On-Call Engineering Services, SamTrans 10
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) PAGE G-2 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS

26. NAMES OF KEY

PERSONNEL
(From Section E, Block 12)

27. ROLE IN THIS CONTRACT
(From Section E, Block 13)

28. EXAMPLE PROJECTS LISTED IN

SECTION F
(Fill in “Example Projects Key” section below before
completing table.

Place “X” under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Jennifer Saldivar, CPM Grant Management and Labor Compliance/ Document Control and Database Management X X
Rhodie Lumanog, CMIT Document Control and Database Management Mark Shipotofsky Document Control and Database Management/ Cost Estimating
Jim Gallego, PE Scheduler
Randy Reichert (Ninyo and Moore) Materials Testing
Paul Medina (Ninyo and Moore) Quality Control/Assurance Vance Hunter (Ninyo and Moore) Quality Control/Assurance Jerry Pascoe, PE, GE Geotechnical Engineer
Garreth Saiki, PE, GE (Ninyo and
Moore) Geotechnical Engineer

29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (From Section F) NO. TITLE OF EXAMPLE PROJECT (From Section F) 1 On-Call Engineering Services (2015 - 2022) 6 Pavement Preservation Program 2 Sewer System Rehabilitation Phase I - Sewer Main
Lining and Spot Repair Projects Nos. 3 and 4 7
3 Building 19 Renovation Project 8
4 On-Call Construction Management Services, LAVTA 9
5 On-Call Engineering Services, SamTrans 10
STANDARD FORM 330 (REV. 7/2021) PAGE 6
ARCHITECT/ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) PART II –GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work) 2a. FIRM (or Branch Office) NAME
Gannett Fleming, Inc. – Irvine, CA

3. YEAR ESTABLISHED
2009

4. UNIQUE ENTITY IDENTIFIER
DUNS: 60-9153887
UEI: None at this time
Not registered in SAM
2b. STREET
20 Pacifica, Suite 430 5. OWNERSHIP
2c. CITY
Irvine
2d. STATE
CA
2e. ZIP CODE
92618
a. TYPE
Corporation
6a. POINT OF CONTACT NAME AND TITLE
Mike Broadwater, CPESC, QSD/P, ToR - Project Manager
b. SMALL BUSINESS STATUS
N/A
6b. TELEPHONE NUMBER
714.749.0090
6c. E-MAIL ADDRESS
[email protected]

7. NAME OF FIRM (if Block 2a is a Branch Office)
Gannett Fleming, Inc.
8a. FORMER FIRM NAME(S) (if any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER

N/A N/A N/A

9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function
Code b. Discipline
c. Number of Employees a. Profile
Code b. Experience
c. Revenue Index
(1) Firm (2) Branch Number
02 Administrative 445 2 No revenue to report for this location. 14 Computer Programmer 125 1
5 Construction Inspector 340 2
16 Construction Manager 183 2
27 Foundation/Geotechnical Engr 83 1
Other Employees 1538
Total 2714 8

11. ANNUAL AVERAGE PROFESSIONAL

SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS

PROFESSIONAL SERVICES REVENUE INDEX NUMBER

1. Less than $100,000 6. $2 million to less than $5 million

2. $100,000 to less than $250,000 7. $5 million to less than $10 million

3. $250,000 to less than $500,000 8. $10 million to less than $25 million

4. $500,000 to less than $1 million 9. $25 million to less than $50 million

5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 1
b. Non-Federal Work 1
c. Total Work 1

12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE b. DATE
May 5, 2022
c. NAME AND TITLE
Ed Durazo, CPM, CCM - Vice President, Regional Manager Southern California Gannett Fleming, Inc.
20 Pacifica, Suite 430
Irvine, CA 92618
t: 714.749.0090
www.gannettfleming.com
On-Call Construction Management / Engineering
Support/ Testing and Inspection Services
Prepared for:

May 5, 2022
3333 Brea Canyon Rd.

Suite 120
Diamond Bar, CA 91765
909-595-1940
www.gkandassociates.com
Tele: 909-595-1940, Fax: 909-595-1314, Email: [email protected]

May 5, 2022
3333 Brea Canyon Road, 120
Diamond Bar, CA 91765
www.gkandassociates.com
RE: On-Call Construction Management, Engineering Support, Testing and Inspection Services

Dear Mr. Mangkalakiri,
GK & Associates is pleased to submit our proposal to provide On-call Construction Management, Engineering Support, Testing and Inspection Services in response to City of Cypress’ RFQ. GK & Associates is uniquely qualified to assist the City with the requested services on various Projects as we have previously assisted Cities with these services on similar projects.

We are proposing Construction Managers and Inspectors, who have decades of experience and knowledge delivering Public Works projects within budget and on time. Our team members are well-versed and fully capable of inspecting all types of projects. We have also teamed up with G3 Quality as our sub-consultant Materials Testing firm as we have several years working on various projects together.

Our whole team is well aware of the potential challenges and plan to deliver projects within budget and of the highest possible quality, while keeping jobsite safety standards in place and all residents, business owners and other stakeholders informed, as we have for our past and current projects. Our staff will make sure the Project stays on schedule and within budget, per City of Cypress’ Plans, standards and Specifications.

We offer the highest quality services at a cost-effective rate without sacrificing quality of our experienced team members who are highly qualified and responsive. In addition, the availability of the Principal gives our clients peace-of-mind that any possible issues that may come up will be resolved quickly and effectively without any delays.

I, Ghazala Khan, as Firm President and Principal, am authorized to negotiate and execute an Agreement with the District on behalf of the firm. GK & Associates will adhere to the provisions described in the above referenced RFP without modification. Please feel free to contact me directly at 909-964-9932 if you have any questions or need additional information.

Sincerely,
EC&AM Associates, Inc. dba GK & Associates
Ghazala Khan
President
City of Cypress
Attn: Mr. Nick Mangkalakiri
5275 Orange Avenue
Cypress, CA 90630

5. NAME OF FIRM

PART I - CONTRACT-SPECIFIC QUALIFICATIONS

ARCHITECT-ENGINEER QUALIFICATIONS
A. CONTRACT INFORMATION

1. TITLE AND LOCATION (City and State)

2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)

4. NAME AND TITLE

6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
(Check) PRIME J-V PARTNER SUBCONTRACTOR

9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
a.
b.
c.
d.
e.
f.

STANDARD FORM 330 (REV. 7/2021)
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

AUTHORIZED FOR LOCAL REPRODUCTION
Enrique Jimenez, P.E.

Chris Marquardt, CCM
Raymond Barajas, Inspector
Daryl Lopez, Inspector
Craig Jents, Inspector
Construction
Managers/Inspectors
Project Principal
Ghazala Khan, MSc, MBA
Sub-consultant
Materials Testing
G3, Guality, Inc
Organizational Chart

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 7/2021) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 7/2021) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 7/2021) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 7/2021) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm

12. NAME 13. ROLE IN THIS CONTRACT

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 7/2021) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.

Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE

19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)

12. NAME
Jordan Roper, PE

13. ROLE IN THIS CONTRACT
Quality Program Manager

14. YEARS EXPERIENCE
a. TOTAL
6 b. WITH CURRENT FIRM
11 15. FIRM NAME AND LOCATION (City and State)
G3 Quality, Inc. (Cerritos, California)

16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS Civil Engineering, Cal State Polytechnic University, Pomona Professional Engineer (Civil, CA), Number 84175

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Nuclear Gauge Testing Certification

19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
On-call Pavement Consulting Services (Los Angeles, California) (2) YEAR COMPLETED

PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm The on-call contract is for as-needed inspection services, pavement evaluation and design, materials testing, and materials mix design at various locations in Los Angeles County and neighboring counties.

As Project Manager, Jordan is managing pavement inspection and assessment services at the Brackett Field Airport in La Verne. The scope of work includes performing a pavement condition assessment to evaluate the pavement and subgrade soil strength for evaluation of the Pavement Classification Number. Jordan also provided overlay inspection and testing services for the county during a pilot project to evaluate the use of “Cool Pavement” technology on residential roadways.

Construction Cost: $472M | Contract Value: $1.2M
b.
(1) TITLE AND LOCATION (City and State)
Paramount Boulevard Median Island Improvement Project (Downey, California) (2) YEAR COMPLETED

PROFESSIONAL SERVICES
2021
CONSTRUCTION (If applicable)
2021
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm The Paramount Boulevard Median Island Improvement project consisted of traffic signal upgrades and safety improvements. As subcontractor to GK and Associates, G3 removed the existing striped median/pavement, installed a raised concrete median island with landscaping and irrigation, left-turn lanes, signage/striping, and repaired miscellaneous concrete surfaces. AC pavement grinding and the construction of rubberized asphalt concrete overlay on lanes were also installed adjacent to the newly constructed median islands.

As Project Manager, Jordan managed material testing and inspection on-site, and reviewed laboratory and field data and inspection reports.

Contract Value: $20K
c.
(1) TITLE AND LOCATION (City and State)
Alameda Corridor East Fullerton Road Grade Separation (City of Industry, California) (2) YEAR COMPLETED

PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
2020
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm The project is located in the City of Industry, crossing the UPRR Los Angeles Subdivision and Metrolink Riverside Line. Major elements of the project included the depressed roadway undercrossing, a new pedestrian bridge, new roadway bridge and the new railroad bridge. The project also included major retaining walls and multiple utility relocations. The Fullerton Road Grade Separation is a complex five-stage project with 19 phases of construction. Located in the City of Industry along State Route 60, the project involves more than 14,000 feet of railroad track construction, 10,000 feet of retaining wall construction, three bridge structures (UPRR, roadway, and pedestrian) as well as extensive, deep (20-35 feet) sewer and storm drain construction with dewatering measures.

As Project Quality Manager, Jordan managed all aspects of testing and inspection services on this $140 million project, the largest of ACE’s Phase II grade separations. Jordan has been responsible for reviewing the contractor’s submittals - asphalt mix designs, concrete mix designs, welding design, etc. With the development of a strong quality program, the quality team provides comments to the contractor to ensure that the submittals will meet the contract requirements.

Construction Cost: $673M | Contract Value: $750K
d.
(1) TITLE AND LOCATION (City and State)
Interstate 10 Express Lanes Corridor Contract 1 (Ontario, California) (2) YEAR COMPLETED

PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm Widening of I-10 between the Los Angeles / San Bernardino County line and I-15, a distance of approximately 10 miles. The project includes two tolled express lanes in each direction. G3’s services include implementing and maintaining the project quality manual, materials control schedules and inspecting and testing all elements of the work including materials validation for soil, aggregates, concrete, hot mix asphalt and steel. Major features of the project include 20 bridge structures, including six overcrossing replacements, two undercrossing replacements, seven undercrossing widenings and five bridge widenings over channels.

As the Project Engineer for quality validation materials control, inspection, and testing, Jordan reviews and is responsible for all field reports and laboratory testing. He issues noncompliances to the contractor when needed and confirm the corrective actions that are occurring. The diligence that Jordan has had in this project has resulted in no rework to date.

Construction Cost: $673M | Contract Value: $14M
e.
(1) TITLE AND LOCATION (City and State)
I-5 Widening and Valley View Interchange Improvement (Buena Park, Cerritos, La Mirada, and Santa Fe Springs, California)
(2) YEAR COMPLETED

PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm The I-5 Valley View Interchange Project began construction in 2016 and will add a High Occupancy Vehicle and mixed-flow lane in each direction along approximately 2 miles of I-5 at Valley View Avenue, from Artesia Boulevard to North Fork Coyote Creek. This is the last segment of the $1.7B I-5 widening program extending from the 605 freeway to the Orange County Line. Major elements of this project include the widening and reconstruction of three bridges including the complex Valley View bridge replacement which also spans an active railroad overpass.

As Project Quality Manager, Jordan developed the Quality Control Plans and is responsible for managing all aspects of the material testing and inspection services, and review of laboratory and field data and inspection reports. The material testing includes lean concrete base rapid setting, HMA, data coring, JPCP, JPCP-RSC, structural concrete, masonry soundwall, MSE wall and structural steel testing of welded or mechanically spliced hoops.

Construction Cost: $640M | Contract Value: $750K
STANDARD FORM 330 (REV. 7/2021) PAGE 2
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)
a. PROJECT OWNER

21. TITLE AND LOCATION (City and State)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 7/2021) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. POINT OF CONTACT NAME

23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE

22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)
a. PROJECT OWNER

21. TITLE AND LOCATION (City and State)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 7/2021) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. POINT OF CONTACT NAME

23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE

22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S

QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.

Complete one Section F for each project.)
a. PROJECT OWNER

21. TITLE AND LOCATION (City and State)

25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT

24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)

20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 7/2021) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. POINT OF CONTACT NAME

23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE

22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
TITLE OF EXAMPLE PROJECT (From Section F)
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
1 2
3 4
5 6
7 8
9 10
STANDARD FORM 330 (REV. 7/2021) PAGE 4

26. NAMES OF KEY

PERSONNEL
(From Section E, Block 12)

27. ROLE IN THIS

CONTRACT
(From Section E, Block 13)
1 2 3 4 5 6 7 8 9 10

29. EXAMPLE PROJECTS KEY
NUMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER

28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below before completing table.

Place "X" under project key number for participation in same or similar role.)

PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE

ARCHITECT-ENGINEER QUALIFICATIONS
2a. FIRM (or Branch Office) NAME
2b. STREET
2c. CITY 2d. STATE 2e. ZIP CODE

3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER

5. OWNERSHIP
b. Discipline c. Number of Employees

10. PROFILE OF FIRM'S EXPERIENCE
AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
b. Experience
c. Revenue Index
Number
(see below)
STANDARD FORM 330 (REV. 7/2021) PAGE 6

1. SOLICITATION NUMBER (If any)
8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED

9. EMPLOYEES BY DISCIPLINE
Total
(1) FIRM (2) BRANCH

1. Less than $100,000

2. $100,000 to less than $250,000

3. $250,000 to less than $500,000

4. $500,000 to less than $1 million

5. $1 million to less than $2 million

11. ANNUAL AVERAGE PROFESSIONAL

SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)

7. NAME OF FIRM (If Block 2a is a Branch Office)
6a. POINT OF CONTACT NAME AND TITLE
6c. EMAIL ADDRESS
8c. UNIQUE ENTITY IDENTIFIER
a. Federal Work
b. Non-Federal Work
c. Total Work

12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
b. DATE
c. NAME AND TITLE
a. Function
Code
a. Profile
Code
6b. TELEPHONE NUMBER
a. TYPE
b. SMALL BUSINESS STATUS

PROFESSIONAL SERVICES REVENUE INDEX NUMBER

6. $2 million to less than $5 million

7. $5 million to less than $10 million

8. $10 million to less than $25 million

9. $25 million to less than $50 million

10. $50 million or greater
Other Employees
www.interwestgrp.com

CITY OF CYPRESS
On-Call Construction Management /
Engineering Support / Testing and
Inspection Services
May 5, 2022

INTERWEST CONSULTING GROUP
Paul Meschino
Vice President, Operations
[email protected]
1 (Complete this section for the prime contractor and all key subcontractors.) STANDARD FORM 330

ARCHITECT - ENGINEER QUALIFICATIONS

PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
B. ARCHITECT-ENGINEER POINT OF CONTACT
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
C. PROPOSED TEAM

9. FIRM NAME
(Check)
PRIME

J-V PARTNER
SUBCONSULTANT

11. ROLE IN THIS CONTRACT

1. TITLE AND LOCATION (City and State)

2. PUBLIC NOTICE DATE

4. NAME AND TITLE

5. NAME OF FIRM

6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS

3. SOLICITATION OR PROJECT NUMBER

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE

CHECK IF BRANCH OFFICE
(ATTACHED)
X
X
X

10. ADDRESS
a.
b.
c.
d.
e.
f.

STANDARD FORM 330 (REV. 8/2016) - SF330-A thru C_CYPRESS_COMPLETE On-Call Construction Management/Engineering Support / Testing and Inspection Services | City of Cypress, CA

04.14.2022
Paul Meschino
Interwest Consulting Group, Inc.
714.899.9039 714.899.9039 [email protected]
PW-006-22
Vice President, Operations
Interwest Consulting
Group, Inc. X
1 Jenner | Suite 160
Irvine, CA 92618
PRIME CONSULTANT:

Construction Management
Engineering Support
Construction Inspection
Ninyo & Moore
X
475 Goddard # 200
Irvine, CA 92618
SUB-CONSULTANT:

Materials Testing
Geotechnical Services
2 D. ORGANIZATIONAL CHART OF PROPOSED TEAM
STANDARD FORM 330 (REV. 8/2016) - SF330-D_CYPRESS
Below please find our Organization Chart illustrating lines of authority, and areas of responsibility.

Kevin Ko, PE, QSD
Project Manager
James G. Ross
Principal-in-Charge
A. CONSTRUCTION

MANAGEMENT
Tyrone Chesanek, PE
Construction Manager
Lea Reis, PE
Construction Manager
Steve Kooyman, PE
Construction Manager
B. ENGINEERING SUPPORT
Tyrone Chesanek, PE
Senior Civil Engineer
Lea Reis, PE
Senior Civil Engineer
Steve Kooyman, PE
Senior Civil Engineer
Dylan Flores
Associate Engineer
Eric Tello, EIT
Associate Engineer
C. TESTING AND

INSPECTION
Ciros Ganji, CESSWI
Construction Inspector
Chuck Stagner
Construction Inspector
John Welch
Construction Inspector
Tom Marnocha, QSP,
CESSWI
Construction Inspector
Ninyo & Moore
(subconsultant)
Garreth Saiki, PE, GE
Principal-in-Charge
Randy Reichert
Project Manager
Vance Hunter
Materials Tester
Paul Medina
Materials Tester
3 c.

E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)

12. NAME

16. EDUCATION (Degree and Specialization)

18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)

17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)

15. FIRM NAME AND LOCATION (City and State)

13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM

14. YEARS OF EXPERIENCE

19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
X Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
X Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
X Check if project performed with current firm
STANDARD FORM 330 (REV. 8/2016) - 1_Kevin Ko_SF330 E_Resume_CYPRESS d
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
X Check if project performed with current firm
e.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
X Check if project performed with current firm

KEVIN KO, PE,QSD
Interwest Consulting Group, Inc.

BS, Civil Engineering
On-going
Irvine, California
University of Hawaii, Manoa
CA Registered Civil Engineer | C88495
HI Professional Civil Engineer | PE-18883
Qualified SWPPP Developer (QSD) | C88495
Project Management Professional | 2918711
Graduate Coursework, Civil and Structural Engineering, University of Hawaii, Manoa Graduate Coursework, Structural Engineering, University of Illinois, Urbana-Champaign

PROJECT MANAGER
8 7
Land Development Engineer / CIP Project Manager Services El Monte, CA
As a Land Development Engineer for the City of El Monte, Kevin serves as the Project Manager for all development projects in the City. Kevin’s duties includes reviewing discretionary projects during the entitlement process, including tentative map review, andsetting engineering conditions of approval. As a CIP Project Manager, Kevin assists the City in delivering capital projects from design all the way to construction. Kevin works closely with the Public Works Department to ensure projects are delivered on time and within budget.

← All documents from this meeting