Cities Index.
Agenda packet

Eastvale City Council
March 27, 2024

Document
Agenda packet
Meeting
March 27, 2024
Body
Eastvale City Council
Pages
47
Original file
223.6 MB
Text extracted from the city's file for reading and search. Open the original on d3n9y02raazwpg.cloudfront.net. That file is the official record.

G. Code, § 2050 et seq.), the Project proponent may seek related take authorization as provided by the Fish and Game Code.

PROJECT DESCRIPTION SUMMARY
Project Location
The City of Eastvale (City) is located in Riverside County, west of Interstate 15, southeast of the San Bernardino County line and directly north of the Santa Ana River.

The City is approximately 13.1 square miles (8,384 acres) and includes a portion of the Santa Ana River directly east of Prado Dam. The Planning Area is the geographic area for which the proposed Project, Eastvale 2040, provides a framework for long-term growth and resource conservation. Project Description
The City is preparing a comprehensive update to its existing General Plan, which will guide the City’s future development and conservation through land use objectives and policy guidance, and constitutes the policy and regulatory framework by which future development projects will be reviewed and public improvements will be implemented.

The proposed Project, Eastvale 2040, will update all the state-required elements, including Land Use, Circulation, Housing, Conservation, Open Space, Noise, and Safety. The Eastvale 2040 Plan will also address urban design, environmental justice, economic development, public health, and sustainability. The City will implement the Eastvale 2040 Plan by requiring development, infrastructure improvements, and other projects to be consistent with its policies and by implementing the actions included in the Plan. The Eastvale 2040 Plan will include a comprehensive set of goals, policies, and actions, as well as a revised Land Use Map. The Planning Area is the geographic area for which the proposed Project, provides a framework for long-term growth and resource conservation.

COMMENTS AND RECOMMENDATIONS
CDFW offers the comments and recommendations below to assist the City in adequately identifying and/or mitigating the Project’s significant, or potentially significant, direct and indirect impacts on fish and wildlife (biological) resources. The comments and recommendations are also offered to enable the CDFW to adequately review and comment on the proposed Project with respect to the Project’s consistency with the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP).

CDFW recommends that the forthcoming DEIR address the following:

Assessment of Biological Resources
Section 15125(c) of the CEQA Guidelines states that knowledge of the regional setting of a project is critical to the assessment of environmental impacts and that special emphasis should be placed on environmental resources that are rare or unique to the 1946
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 3 of 14 ends

region. To enable CDFW staff to adequately review and comment on the project, the DEIR should include a complete assessment of the flora and fauna within and adjacent to the Project footprint, with particular emphasis on identifying rare, threatened, endangered, and other sensitive species and their associated habitats.

CDFW recommends that the DEIR specifically include:

1. An assessment of the various habitat types located within the project footprint, and a map that identifies the location of each habitat type. CDFW recommends that floristic, alliance- and/or association-based mapping and assessment be completed following The Manual of California Vegetation, second edition (Sawyer et al. 20091). Adjoining habitat areas should also be included in this assessment where site activities could lead to direct or indirect impacts offsite. Habitat mapping at the alliance level will help establish baseline vegetation conditions.

2. A general biological inventory of the fish, amphibian, reptile, bird, and mammal species that are present or have the potential to be present within each habitat type onsite and within adjacent areas that could be affected by the project. CDFW’s California Natural Diversity Database (CNDDB) in Sacramento should be contacted at (916) 322-2493 or [email protected] or
https://wildlife.ca.gov/Data/CNDDB/Maps-and-Data to obtain current information on any previously reported sensitive species and habitat, including Significant Natural Areas identified under Chapter 12 of the Fish and Game Code, in the vicinity of the proposed Project.

CDFW’s CNDDB is not exhaustive in terms of the data it houses, nor is it an absence database. CDFW recommends that it be used as a starting point in gathering information about the potential presence of species within the general area of the project site.

3. A complete, recent inventory of rare, threatened, endangered, and other sensitive species located within the Project footprint and within offsite areas with the potential to be affected, including California Species of Special Concern (CSSC) and California Fully Protected Species (Fish & G. Code, § 3511). Species to be addressed should include all those which meet the CEQA definition (CEQA Guidelines § 15380). The inventory should address seasonal variations in use of the Project area and should not be limited to resident species. Focused species-specific/MSHCP surveys, completed by a qualified biologist and conducted at the appropriate time of year and

1 Sawyer, J. O., T. Keeler-Wolf, and J. M. Evens. 2009. A manual of California Vegetation, 2nd ed. California Native Plant Society Press, Sacramento, California. http://vegetation.cnps.org/ 1947
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 4 of 14 ends

time of day when the sensitive species are active or otherwise identifiable, are required. Acceptable species-specific survey procedures should be developed in consultation with CDFW and the U.S. Fish and Wildlife Service, where necessary.

Note that CDFW generally considers biological field assessments for wildlife to be valid for a one-year period, and assessments for rare plants may be considered valid for a period of up to three years. Some aspects of the proposed Project may warrant periodic updated surveys for certain sensitive taxa, particularly if the Project is proposed to occur over a protracted time frame, or in phases, or if surveys are completed during periods of drought.

4. A thorough, recent, floristic-based assessment of special status plants and natural communities, following CDFW’s Protocols for Surveying and Evaluating Impacts to Special Status Native Plant Populations and Natural Communities (CDFW 20182).

5. Information on the regional setting that is critical to an assessment of environmental impacts, with special emphasis on resources that are rare or unique to the region (CEQA Guidelines § 15125[c]).

6. A full accounting of all open space and mitigation/conservation lands within and adjacent to the Project.

Analysis of Direct, Indirect, and Cumulative Impacts to Biological Resources The DEIR should provide a thorough discussion of the direct, indirect, and cumulative impacts expected to adversely affect biological resources as a result of the Project. To ensure that Project impacts to biological resources are fully analyzed, the following information should be included in the DEIR:

1. A discussion of potential impacts from lighting, noise, human activity (e.g., recreation), defensible space, and wildlife-human interactions created by zoning of development projects or other project activities adjacent to natural areas, exotic and/or invasive species, and drainage. The latter subject should address Projectrelated changes on drainage patterns and water quality within, upstream, and downstream of the Project site, including: volume, velocity, and frequency of existing and post-Project surface flows; polluted runoff; soil erosion and/or sedimentation in streams and water bodies; and post-Project fate of runoff from the Project site.

2. A discussion of potential indirect Project impacts on biological resources, including resources in areas adjacent to the project footprint, such as nearby public lands (e.g., National Forests, State Parks, etc.), open space, adjacent natural habitats, riparian

2 CDFW, 2018. Protocols for Surveying and Evaluating Impacts to Special Status Native Plant Populations and Sensitive Natural Communities, State of California, California Natural Resources Agency, Department of Fish and Wildlife: March 20, 2018 (https://nrm.dfg.ca.gov/FileHandler.ashx?DocumentID=18959&inline) 1948
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 5 of 14 ends

ecosystems, wildlife corridors, and any designated and/or proposed reserve or mitigation lands (e.g., preserved lands associated with a Natural Community Conservation Plan, or other conserved lands).

3. An evaluation of impacts to on-site and adjacent open space lands from both the construction of the Project and any long-term operational and maintenance needs.

4. A cumulative effects analysis developed as described under CEQA Guidelines section 15130. The DEIR should analyze the cumulative effects of the plan’s land use designations, policies, and programs on the environment. Please include all potential direct and indirect Project related impacts to riparian areas, wetlands, vernal pools, alluvial fan habitats, wildlife corridors or wildlife movement areas, aquatic habitats, sensitive species and other sensitive habitats, open lands, open space, and adjacent natural habitats in the cumulative effects analysis. General and specific plans, as well as past, present, and anticipated future projects, should be analyzed relative to their impacts on similar plant communities and wildlife habitats.

Alternatives Analysis
CDFW recommends the DEIR describe and analyze a range of reasonable alternatives to the Project that are potentially feasible, would “feasibly attain most of the basic objectives of the Project,” and would avoid or substantially lessen any of the Project’s significant effects (CEQA Guidelines § 15126.6[a]). The alternatives analysis should also evaluate a “no project” alternative (CEQA Guidelines § 15126.6[e]). The no Project alternative should evaluate how the changing environment, such as climate change and drought, may affect the community if a new or revised general plan were not adopted.

Mitigation Measures for Project Impacts to Biological Resources The DEIR should identify mitigation measures and alternatives that are appropriate and adequate to avoid or minimize potential impacts, to the extent feasible. The City of Eastvale should assess all direct, indirect, and cumulative impacts that are expected to occur as a result of the implementation of the Project and its long-term operation and maintenance. When proposing measures to avoid, minimize, or mitigate impacts, CDFW recommends consideration of the following:

1. Fully Protected Species: Fully protected species may not be taken or possessed at any time. Project activities described in the DEIR should be designed to completely avoid any fully protected species that have the potential to be present within or adjacent to the Project area. CDFW also recommends that the DEIR fully analyze potential adverse impacts to fully protected species due to habitat modification, loss of foraging habitat, and/or interruption of migratory and breeding behaviors. CDFW recommends that the Lead Agency include in the analysis how appropriate avoidance, minimization, and mitigation measures will reduce indirect impacts to fully protected species.
1949
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 6 of 14 ends

2. Sensitive Plant Communities: CDFW considers sensitive plant communities to be imperiled habitats having both local and regional significance. Plant communities, alliances, and associations with a statewide ranking of S-1, S-2, S-3, and S-4 should be considered sensitive and declining at the local and regional level. These ranks can be obtained by querying the CNDDB and are included in The Manual of California Vegetation (Sawyer et al. 2009). The DEIR should include measures to fully avoid and otherwise protect sensitive plant communities from project-related direct and indirect impacts.

3. California Species of Special Concern (CSSC): CSSC status applies to animals generally not listed under the federal Endangered Species Act or the CESA, but which nonetheless are declining at a rate that could result in listing, or historically occurred in low numbers and known threats to their persistence currently exist.

CSSCs should be considered during the environmental review process. CSSC that have the potential or have been documented to occur within or adjacent to the project area, including, but not limited to: burrowing owl, northern harrier, loggerhead shrike, and yellow warbler.

4. Mitigation: CDFW considers adverse project-related impacts to sensitive species and habitats to be significant to both local and regional ecosystems, and the DEIR should include mitigation measures for adverse project-related impacts to these resources.

Mitigation measures should emphasize avoidance and reduction of project impacts.

For unavoidable impacts, onsite habitat restoration and/or enhancement, and preservation should be evaluated and discussed in detail. Where habitat preservation is not available onsite, offsite land acquisition, management, and preservation should be evaluated and discussed in detail.

The DEIR should include measures to perpetually protect the targeted habitat values within mitigation areas from direct and indirect adverse impacts in order to meet mitigation objectives to offset project-induced qualitative and quantitative losses of biological values. Specific issues that should be addressed include restrictions on access, proposed land dedications, long-term monitoring and management programs, control of illegal dumping, water pollution, increased human intrusion, etc.

If sensitive species and/or their habitat may be impacted from the Project, CDFW recommends the inclusion of specific mitigation in the DEIR. CEQA Guidelines section 15126.4, subdivision (a)(1)(8) states that formulation of feasible mitigation measures should not be deferred until some future date. The Court of Appeal in San Joaquin Raptor Rescue Center v. County of Merced (2007) 149 Cal.App.4th 645 struck down mitigation measures which required formulating management plans developed in consultation with State and Federal wildlife agencies after Project approval. Courts have also repeatedly not supported conclusions that impacts are mitigable when essential studies, and therefore impact assessments, are incomplete (Sundstrom v. County of Mendocino (1988) 202 Cal. App. 3d. 296; Gentry v. City of 1950
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 7 of 14 ends

Murrieta (1995) 36 Cal. App. 4th 1359; Endangered Habitat League, Inc. v. County of Orange (2005) 131 Cal. App. 4th 777).

CDFW recommends that the DEIR specify mitigation that is roughly proportional to the level of impacts, in accordance with the provisions of CEQA (CEQA Guidelines, §§ 15126.4(a)(4)(B), 15064, 15065, and 16355). The mitigation should provide longterm conservation value for the suite of species and habitat being impacted by the Project. Furthermore, in order for mitigation measures to be effective, they need to be specific, enforceable, and feasible actions that will improve environmental conditions.

5. Habitat Revegetation/Restoration Plans: Plans for restoration and revegetation should be prepared by persons with expertise in southern California ecosystems and native plant restoration techniques. Plans should identify the assumptions used to develop the proposed restoration strategy. Each plan should include, at a minimum:
(a) the location of restoration sites and assessment of appropriate reference sites; (b) the plant species to be used, sources of local propagules, container sizes, and seeding rates; (c) a schematic depicting the mitigation area; (d) a local seed and cuttings and planting schedule; (e) a description of the irrigation methodology; (f) measures to control exotic vegetation on site; (g) specific success criteria; (h) a detailed monitoring program; (i) contingency measures should the success criteria not be met; and (j) identification of the party responsible for meeting the success criteria and providing for conservation of the mitigation site in perpetuity. Monitoring of restoration areas should extend across a sufficient time frame to ensure that the new habitat is established, self-sustaining, and capable of surviving drought.

CDFW recommends that local onsite propagules from the Project area and nearby vicinity be collected and used for restoration purposes. Onsite seed collection should be initiated in advance of project impacts in order to accumulate sufficient propagule material for subsequent use in future years. Onsite vegetation mapping at the alliance and/or association level should be used to develop appropriate restoration goals and local plant palettes. Reference areas should be identified to help guide restoration efforts. Specific restoration plans should be developed for various project components as appropriate.

Restoration objectives should include protecting special habitat elements or recreating them in areas affected by the Project; examples could include retention of woody material, logs, snags, rocks, and brush piles.

6. Nesting Birds and Migratory Bird Treaty Act: Please note that it is the Project proponent’s responsibility to comply with all applicable laws related to nesting birds and birds of prey. Fish and Game Code sections 3503, 3503.5, and 3513 afford protective measures as follows: Fish and Game Code section 3503 makes it unlawful to take, possess, or needlessly destroy the nest or eggs of any bird, except as otherwise provided by Fish and Game Code or any regulation made pursuant thereto.

Fish and Game Code section 3503.5 makes it unlawful to take, possess, or destroy 1951
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 8 of 14 ends

any birds in the orders Falconiformes or Strigiformes (birds-of-prey) to take, possess, or destroy the nest or eggs of any such bird except as otherwise provided by Fish and Game Code or any regulation adopted pursuant thereto. Fish and Game Code section 3513 makes it unlawful to take or possess any migratory nongame bird as designated in the Migratory Bird Treaty Act or any part of such migratory nongame bird except as provided by rules and regulations adopted by the Secretary of the Interior under provisions of the Migratory Treaty Act.

CDFW recommends that the DEIR include the results of avian surveys, as well as specific avoidance and minimization measures to ensure that impacts to nesting birds do not occur. Project-specific avoidance and minimization measures may include, but not be limited to project phasing and timing, monitoring of project-related noise (where applicable), sound walls, and buffers, where appropriate. The DEIR should also include specific avoidance and minimization measures that will be implemented should a nest be located within the project site. If pre-construction surveys are proposed in the DEIR, the CDFW recommends that they be required no more than three (3) days prior to vegetation clearing or ground disturbance activities, as instances of nesting could be missed if surveys are conducted sooner.

7. Moving out of Harm’s Way: To avoid direct mortality, CDFW recommends that the lead agency condition the DEIR to require that a CDFW-approved qualified biologist be retained to be onsite prior to and during all ground- and habitat-disturbing activities to move out of harm’s way special status species or other wildlife of low or limited mobility that would otherwise be injured or killed from project-related activities.

Movement of wildlife out of harm’s way should be limited to only those individuals that would otherwise by injured or killed, and individuals should be moved only as far a necessary to ensure their safety (i.e., CDFW does not recommend relocation to other areas). Furthermore, it should be noted that the temporary relocation of onsite wildlife does not constitute effective mitigation for the purposes of offsetting project impacts associated with habitat loss.

8. Translocation of Species: CDFW generally does not support the use of relocation, salvage, and/or transplantation as mitigation for impacts to rare, threatened, or endangered species as studies have shown that these efforts are experimental in nature and largely unsuccessful.

California Endangered Species Act
CDFW is responsible for ensuring appropriate conservation of fish and wildlife resources including threatened, endangered, and/or candidate plant and animal species, pursuant to CESA. CDFW recommends that a CESA Incidental Take Permit (ITP) be obtained if the Project has the potential to result in “take” (California Fish and Game Code Section 86 defines “take” as “hunt, pursue, catch, capture, or kill, or attempt to hunt, pursue, catch, capture, or kill”) of State-listed CESA species, either through 1952
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 9 of 14 ends

construction or over the life of the project. It is the policy of CESA to conserve, protect, enhance, and restore State-listed CESA species and their habitats.

CDFW encourages early consultation, as significant modification to the proposed Project and avoidance, minimization, and mitigation measures may be necessary to obtain a CESA ITP. The California Fish and Game Code requires that CDFW comply with CEQA for issuance of a CESA ITP. CDFW therefore recommends that the DEIR addresses all Project impacts to listed species and specifies a mitigation monitoring and reporting program that will meet the requirements of CESA.

Western Riverside County Multiple Species Habitat Conservation Plan CDFW issued Natural Community Conservation Plan Approval and Take Authorization for the Western Riverside County MSHCP per Section 2800, et seq., of the California Fish and Game Code on June 22, 2004. The MSHCP establishes a multiple species conservation program to minimize and mitigate habitat loss and provides for the incidental take of covered species in association with activities covered under the permit.

Compliance with approved habitat plans, such as the MSHCP, is discussed in CEQA.

Specifically, Section 15125(d) of the CEQA Guidelines requires that the CEQA document discuss any inconsistencies between a proposed Project and applicable general plans and regional plans, including habitat conservation plans and natural community conservation plans. An assessment of the impacts to the MSHCP as a result of this Project is necessary to address CEQA requirements. To obtain additional information regarding the MSHCP please go to: https://www.wrc-rca.org/.

The proposed Project occurs within the MSHCP area and is subject to the provisions and policies of the MSHCP. To be considered a covered activity, Permittees need to demonstrate that proposed actions are consistent with the MSHCP, the Permits, and the Implementing Agreement. The City of Eastvale is the Lead Agency and is signatory to the Implementing Agreement of the MSHCP. To demonstrate consistency with the MSHCP, as part of the CEQA review, the City shall ensure the Project implements the following:
a. Addressing the collection of fees as set forth in Section 8.5 of the MSHCP (City of Eastvale Ordinance NO. 21-05)
b. Demonstrates compliance with the HANS process or equivalent process to ensure application of the Criteria and thus, satisfaction of the local acquisition obligation. c. Demonstrates compliance with the policies for 1) the Protection of Species Associated with Riparian/Riverine Areas and Vernal Pools, set forth in Section 6.1.2 of the MSHCP; 2) the policies for the Protection of Narrow Endemic Plant Species set forth in Section 6.1.3 of the MSHCP; 3) compliance with the Urban/Wildlands 1953
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 10 of 14 ends

Interface Guidelines as set forth in Section 6.1.4 of the MSHCP; 4) the Additional Survey Needs and Procedures as set forth in Section 6.3.2 and associated vegetation survey requirements identified in Section 6.3.1; and 5) compliance with the Best Management Practices and the siting, construction, design, operation and maintenance guidelines as set forth in Section 7.0 and Appendix C of the MSHCP.

Because the Project is located within the MSHCP Criteria Area, pursuant to the Implementing Agreement and the City’s Resolution No. 10-49, public and private projects are expected to be designed and implemented in accordance with the Criteria for each Area Plan and all other MSHCP requirements as set forth in the MSHCP and in Section

13.0 of the Implementing Agreement. Section 13.2 of the Implementing Agreement identifies that City obligations under the MSHCP and the Implementing Agreement include, but are not limited to: the adoption and maintenance of ordinances or resolutions (City Ordinance No. 21-05 and Resolution No. 10-49), as necessary, and the amendment of general plans as appropriate, to implement the requirements and to fulfill the purposes of the Permits, the MSHCP, and the Implementing Agreement for private and public development projects (including siting, construction, design, operation and maintenance guidelines as set forth in Section 7.0 and Appendix C of the MSHCP); and taking all necessary and appropriate actions, following applicable land use permit enforcement procedures and practices, to enforce the terms of the project approvals for public and private projects, including compliance with the MSHCP, the Permits, and the Implementing Agreement.

The MSHCP identifies that the CDFW and the U. S. Fish and Wildlife Service shall be notified in advance of approval of public and private projects for identified MSHCP activities. Therefore, CDFW recommends that the Eastvale 2040 Plan should identify that required MSHCP processes are completed prior to City approval of future projects.

The City is also obligated to notify the Western Riverside County Regional Conservation Authority (RCA), through the Joint Project/Acquisition Review Process set forth in Section 6.6.2 of the MSHCP or proposed discretionary Projects within the Criteria Area and participate in any further requirements imposed by MSHCP Section 6.6.2.

To examine how the Project might contribute to, or conflict with, assembly of the MSHCP Conservation Area consistent with the reserve configuration requirements CDFW recommends that the DEIR identify the specific Area Plan and Area Plan Subunit within which the Project is located, and the associated Planning Species and Biological Issues and Considerations that may apply to the Project. The DEIR should also discuss the specific Criteria for Cells or Cell Groups within which the Project is located and identify the associated Core(s) and/or Linkage(s). Next, the DEIR should identify the vegetation communities toward which conservation should be directed along with the connectivity requirements. Finally, the DEIR should examine the Project with respect to the percentage conservation portion within the Cells or Cell Groups.

Following this sequential identification of the relationship of the Project to the MSHCP the DEIR should then include an in-depth discussion of the Project in the context of 1954
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 11 of 14 ends

these aforementioned elements, and as mentioned, examine how the Project might contribute to, or conflict with, the conservation criteria of the MSHCP.

CDFW also recommends that the City demonstrate how the Project is consistent with Section 7.0 of the MSHCP. For projects proposed within Public/Quasi-Public Lands, the DEIR should include a discussion of the Eastvale 2040 plan and its consistency with MSHCP requirements for Covered Activities within Existing Public/Quasi-Public lands (Section 7.2), and for projects proposed inside the MSHCP Criteria Area, the DEIR should include a discussion of the Project and its consistency with the MSHCP requirements for Covered Activities Inside Criteria Area (Section 7.3 of the MSHCP).

Where maintenance of existing roads within the Criteria Area is proposed, CDFW recommends that the City reference MSHCP Section 7.3.4 and Table 7-3, which provides a summary of the existing roads permitted to remain in the MSHCP Criteria Area. Planned roads within the MSHCP Criteria Area are discussed in MSHCP Section

7.3.5 and identified on Figure 7-1. Please note that roadways other than those identified in Section 7.3.5 of the MSHCP are not covered without an amendment to the MSHCP in accordance with the procedures described in MSHCP Section 6.10. CDFW recommends that the City review MSHCP Section 7.3.5 and include in the DEIR information that demonstrates that Project-related roads are MSHCP covered activities. The DEIR should also discuss design and siting information for all proposed roads to ensure that the roads are sited, designed, and constructed in a manner consistent with MSHCP conservation objectives.

CDFW recommends that the DEIR also include a discussion of the Project and MSHCP Section 7.4, which identifies and discusses allowable uses in the MSHCP Conservation Area. For example, if trails are proposed as part of the Project, the DEIR should discuss whether the trail is identified on Figure 7-4, and provide details regarding trail construction (siting and design), and operations and maintenance that demonstrate that the proposed trail is consistent with MSHCP Section 7.4.

Regardless of whether take of threatened and/or endangered species is obtained through the MSHCP or through a CESA ITP, the DEIR needs to address how the proposed Project will affect the policies and procedures of the MSHCP.

Stephens’ Kangaroo Rat Habitat Conservation Plan
The Project occurs within the Stephens’ kangaroo rat (Dipodomys stephensi) Habitat Conservation Plan (SKR HCP) fee area boundary, SKR HCP plan area map available here: https://rchca.us/DocumentCenter/View/200/SKR-Plan-Area. State and federal authorizations associated with the SKR HCP provide take authorization for Stephens’ kangaroo rat within its boundaries, and the MSHCP provides Take Authorization for Stephens’ kangaroo rat outside of the boundaries of the SKR HCP, but within the MSHCP area boundaries. The DEIR should identify if any portion of the Project will occur on SKR HCP lands, or on Stephens’ kangaroo rat habitat lands outside of the SKR HCP, but within the MSHCP. Note that the SKR HCP allows for encroachment into 1955
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 12 of 14 ends

the Stephens’ kangaroo rat Core Reserve for public projects, however, there are no provisions for encroachment into the Core Reserve for privately owned projects. If impacts to Stephens’ kangaroo rat habitat will occur from the proposed Project, the DEIR should specifically identify the total number of permanent impacts to Stephens’ kangaroo rat core habitat and the appropriate mitigation to compensate for those impacts.

Lake and Streambed Alteration Program
Based on review of material submitted with the NOP and review of aerial photography, at least one drainage feature traverses the site. Depending on how the Project is designed and constructed, it is likely that the Project applicant will need to notify CDFW per Fish and Game Code section 1602. Fish and Game Code section 1602 requires an entity to notify CDFW prior to commencing any activity that may do one or more of the following: substantially divert or obstruct the natural flow of any river, stream, or lake; substantially change or use any material from the bed, channel or bank of any river, stream, or lake; or deposit debris, waste or other materials that could pass into any river, stream, or lake. Please note that "any river, stream or lake" includes those that are episodic (i.e., those that are dry for periods of time) as well as those that are perennial (i.e., those that flow year-round). This includes ephemeral streams, desert washes, and watercourses with a subsurface flow.

Upon receipt of a complete notification, CDFW determines if the proposed Project activities may substantially adversely affect existing fish and wildlife resources and whether a Lake and Streambed Alteration (LSA) Agreement is required. An LSA Agreement includes measures necessary to protect existing fish and wildlife resources.

CDFW may suggest ways to modify your Project that would eliminate or reduce harmful impacts to fish and wildlife resources.

CDFW’s issuance of an LSA Agreement is a “project” subject to CEQA (see Pub.

Resources Code § 21065). To facilitate issuance of an LSA Agreement, if necessary, the DEIR should fully identify the potential impacts to the lake, stream, or riparian resources, and provide adequate avoidance, mitigation, and monitoring and reporting commitments. Early consultation with CDFW is recommended, since modification of the proposed Project may be required to avoid or reduce impacts to fish and wildlife resources. To submit a Lake or Streambed Alteration notification, please go to https://wildlife.ca.gov/Conservation/Environmental-Review/EPIMS .

ADDITIONAL COMMENTS AND RECOMMENDATIONS
To ameliorate the water demands of this Project, CDFW recommends incorporation of water-wise concepts in project landscape design plans. In particular, CDFW recommends xeriscaping with locally native California species, and installing waterefficient and targeted irrigation systems (such as drip irrigation). Native plants support butterflies, birds, reptiles, amphibians, small mammals, bees, and other pollinators that 1956
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 13 of 14 ends

evolved with those plants, more information on native plants suitable for the Project location and nearby nurseries is available at CALSCAPE: https://calscape.org/. Local water agencies/districts and resource conservation districts in your area may be able to provide information on plant nurseries that carry locally native species, and some facilities display drought-tolerant locally native species demonstration gardens (for example the Riverside-Corona Resource Conservation District in Riverside). Information on drought-tolerant landscaping and water-efficient irrigation systems is available on California’s Save our Water website: https://saveourwater.com/ .

ENVIRONMENTAL DATA
CEQA requires that information developed in environmental impact reports and negative declarations be incorporated into a database which may be used to make subsequent or supplemental environmental determinations. (Pub. Resources Code, § 21003, subd. (e).) Accordingly, please report any special status species and natural communities detected during Project surveys to the California Natural Diversity Database (CNDDB). Information can be submitted online or via completion of the CNDDB field survey form at the following link:
https://wildlife.ca.gov/Data/CNDDB/Submitting-Data . The types of information reported to CNDDB can be found at the following link:
https://www.wildlife.ca.gov/Data/CNDDB/Plants-and-Animals.

ENVIRONMENTAL DOCUMENT FILING FEES
The Project, as proposed, would have an impact on fish and/or wildlife, and assessment of filing fees is necessary. Fees are payable upon filing of the Notice of Determination by the Lead Agency and serve to help defray the cost of environmental review by CDFW. Payment of the fee is required in order for the underlying project approval to be operative, vested, and final. (Cal. Code Regs, tit. 14, § 753.5; Fish & G. Code, § 711.4; Pub. Resources Code, § 21089.).

CONCLUSION
CDFW appreciates the opportunity to comment on the NOP of a DEIR for the City of Eastvale General Plan Update (SCH No. 2022080090) and recommends that the City of Eastvale address CDFW’s comments and concerns in the forthcoming DEIR. Questions regarding this letter or further coordination should be directed to Carly Beck, Senior Environmental Scientist (Specialist), at [email protected]. 1957
Gustavo N. Gonzalez, Planning Manager
City of Eastvale
September 6, 2022

Page 14 of 14 ends

Sincerely,
Kim Freeburn
Acting Environmental Program Manager
ec:

Heather Pert, Senior Environmental Scientist, Supervisor Inland Deserts Region
[email protected]
Office of Planning and Research, State Clearinghouse, Sacramento [email protected]
Tricia Campbell (Western Riverside County Regional Conservation Authority) Director of Reserve Management and Monitoring
[email protected]
1958

APPENDIX B
Air Quality, Energy, and
Greenhouse Gas Data
1959
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 1 / 35
Eastvale GPU Existing 2022 condition Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.4. Operations Emissions Compared Against Thresholds

2.5. Operations Emissions by Sector, Unmitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.3. Area Emissions by Source
1960
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 2 / 35

4.3.2. Unmitigated

4.4. Water Emissions by Land Use

4.4.2. Unmitigated

4.5. Waste Emissions by Land Use

4.5.2. Unmitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 1961
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 3 / 35

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated

5.15. Operational Off-Road Equipment
1962
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 4 / 35

5.15.1. Unmitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures
1963
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 5 / 35

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
1964
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 6 / 35

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name Eastvale GPU Existing 2022 condition
Operational Year 2022
Lead Agency —
Land Use Scale Plan/community
Analysis Level for Defaults County
Windspeed (m/s) 2.60
Precipitation (days) 18.8
Location Eastvale, CA, USA
County Riverside-South Coast
City Eastvale
Air District South Coast AQMD
Air Basin South Coast
TAZ 5499
EDFZ 11
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.14

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Single Family
Housing
13,980 Dwelling Unit 4,539 27,261,000 163,745,741 — 45,155 — 1965
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 7 / 35
Apartments High
Rise
4,415 Dwelling Unit 71.2 4,238,400 42,384 — 14,260 —
Unrefrigerated
Warehouse-No Rail
117,962 1000sqft 270 117,961,780 117,961 — — —
Regional Shopping
Center
3,126 1000sqft 71.8 3,125,517 31,255 — — —
Office Park 811 1000sqft 18.6 810,651 8,106 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1,632 24,701 2,433 18,855 35.6 109 2,366 2,475 110 601 711 125,018 5,143,65 3 5,268,67
1 12,891 259 14,147 5,682,13
8 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 578 23,727 2,482 9,885 33.4 102 2,366 2,468 100 601 701 125,018 4,931,30 5 5,056,32
3 12,888 263 603 5,457,42
4 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 1,270 24,380 2,315 14,545 32.4 87.3 2,366 2,453 87.7 601 688 125,018 4,668,65 6 4,793,67
4 12,884 264 6,246 5,200,61
5 Annual
(Max)
— — — — — — — — — — — — — — — — — —
1966
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 8 / 35
Unmit. 232 4,449 423 2,654 5.91 15.9 432 448 16.0 110 126 20,698 772,949 793,647 2,133 43.7 1,034 861,021

2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 471 354 1,362 11,837 29.0 22.6 2,366 2,389 21.2 601 622 — 2,966,81 6 2,966,81
6 80.8 113 13,904 3,016,39
5 Area 1,078 24,305 315 6,440 2.02 28.6 — 28.6 31.0 — 31.0 0.00 353,816 353,816 7.23 0.83 — 354,244 Energy 84.1 42.1 756 577 4.59 58.1 — 58.1 58.1 — 58.1 — 1,622,24 2 1,622,24
2 148 9.86 — 1,628,87
9 Water — — — — — — — — — — — 54,426 200,779 255,205 5,600 135 — 435,399 Waste — — — — — — — — — — — 70,593 0.00 70,593 7,055 0.00 — 246,979 Refrig. — — — — — — — — — — — — — — — — 243 243
Total 1,632 24,701 2,433 18,855 35.6 109 2,366 2,475 110 601 711 125,018 5,143,65 3 5,268,67
1 12,891 259 14,147 5,682,13
8 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 463 350 1,467 9,198 27.2 22.6 2,366 2,389 21.2 601 622 — 2,779,06 0 2,779,06
0 79.0 117 361 2,816,36
0 Area 30.4 23,336 259 110 1.66 21.0 — 21.0 21.0 — 21.0 0.00 329,225 329,225 6.20 0.62 — 329,564 Energy 84.1 42.1 756 577 4.59 58.1 — 58.1 58.1 — 58.1 — 1,622,24 2 1,622,24
2 148 9.86 — 1,628,87
9 Water — — — — — — — — — — — 54,426 200,779 255,205 5,600 135 — 435,399 Waste — — — — — — — — — — — 70,593 0.00 70,593 7,055 0.00 — 246,979 Refrig. — — — — — — — — — — — — — — — — 243 243
Total 578 23,727 2,482 9,885 33.4 102 2,366 2,468 100 601 701 125,018 4,931,30 5 5,056,32
3 12,888 263 603 5,457,42
4 1967
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 9 / 35
Average
Daily
— — — — — — — — — — — — — — — — — —
Mobile 466 352 1,503 9,625 27.5 22.6 2,366 2,389 21.2 601 622 — 2,806,24 2 2,806,24
2 79.4 119 6,004 2,849,63
9 Area 719 23,985 56.0 4,343 0.36 6.65 — 6.65 8.33 — 8.33 0.00 39,393 39,393 1.13 0.19 — 39,477 Energy 84.1 42.1 756 577 4.59 58.1 — 58.1 58.1 — 58.1 — 1,622,24 2 1,622,24
2 148 9.86 — 1,628,87
9 Water — — — — — — — — — — — 54,426 200,779 255,205 5,600 135 — 435,399 Waste — — — — — — — — — — — 70,593 0.00 70,593 7,055 0.00 — 246,979 Refrig. — — — — — — — — — — — — — — — — 243 243
Total 1,270 24,380 2,315 14,545 32.4 87.3 2,366 2,453 87.7 601 688 125,018 4,668,65 6 4,793,67
4 12,884 264 6,246 5,200,61
5 Annual — — — — — — — — — — — — — — — — — —
Mobile 85.1 64.3 274 1,757 5.01 4.12 432 436 3.87 110 114 — 464,605 464,605 13.1 19.7 994 471,790 Area 131 4,377 10.2 793 0.07 1.21 — 1.21 1.52 — 1.52 0.00 6,522 6,522 0.19 0.03 — 6,536 Energy 15.4 7.68 138 105 0.84 10.6 — 10.6 10.6 — 10.6 — 268,581 268,581 24.5 1.63 — 269,679 Water — — — — — — — — — — — 9,011 33,241 42,252 927 22.3 — 72,085 Waste — — — — — — — — — — — 11,687 0.00 11,687 1,168 0.00 — 40,890 Refrig. — — — — — — — — — — — — — — — — 40.2 40.2
Total 232 4,449 423 2,654 5.91 15.9 432 448 16.0 110 126 20,698 772,949 793,647 2,133 43.7 1,034 861,021

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Mobile source emissions results are presented in Sections 2.6. No further detailed breakdown of emissions is available.

4.2. Energy
1968
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 10 / 35

4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — 124,710 124,710 11.8 1.43 — 125,431 Apartme
nts
High Rise
— — — — — — — — — — — — 23,865 23,865 2.26 0.27 — 24,003 Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — — 518,564 518,564 49.1 5.95 — 521,564 Regional
Shopping
Center
— — — — — — — — — — — — 29,133 29,133 2.76 0.33 — 29,301 Office
Park
— — — — — — — — — — — — 13,506 13,506 1.28 0.15 — 13,585 Total — — — — — — — — — — — — 709,778 709,778 67.2 8.14 — 713,884 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — 124,710 124,710 11.8 1.43 — 125,431 Apartme
nts
High Rise
— — — — — — — — — — — — 23,865 23,865 2.26 0.27 — 24,003 1969
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 11 / 35
Unrefrige — — — — — — — — — — — — 518,564 518,564 49.1 5.95 — 521,564 rated
Warehou
Rail
Regional
Shopping
Center
— — — — — — — — — — — — 29,133 29,133 2.76 0.33 — 29,301 Office
Park
— — — — — — — — — — — — 13,506 13,506 1.28 0.15 — 13,585 Total — — — — — — — — — — — — 709,778 709,778 67.2 8.14 — 713,884 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — 20,647 20,647 1.95 0.24 — 20,767 Apartme
nts
High Rise
— — — — — — — — — — — — 3,951 3,951 0.37 0.05 — 3,974
Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — — 85,854 85,854 8.13 0.99 — 86,351 Regional
Shopping
Center
— — — — — — — — — — — — 4,823 4,823 0.46 0.06 — 4,851
Office
Park
— — — — — — — — — — — — 2,236 2,236 0.21 0.03 — 2,249
Total — — — — — — — — — — — — 117,512 117,512 11.1 1.35 — 118,192

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 1970
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 12 / 35
Daily,——————————————————
Summer
(Max)
Single
Family
Housing

14.7 7.34 126 53.4 0.80 10.1— 10.1 10.1— 10.1— 159,342 159,342 14.1 0.30— 159,784 Apartme
nts
High Rise

1.68 0.84 14.4 6.12 0.09 1.16— 1.16 1.16— 1.16— 18,243 18,243 1.61 0.03— 18,293 Unrefrige
rated Warehou
se-No
Rail

66.5 33.3 605 508 3.63 46.0— 46.0 46.0— 46.0— 721,780 721,780 63.9 1.36— 723,782 Regional
Shopping
Center

0.55 0.27 4.97 4.18 0.03 0.38— 0.38 0.38— 0.38— 5,932 5,932 0.52 0.01— 5,949 Office
Park

0.66 0.33 6.01 5.05 0.04 0.46— 0.46 0.46— 0.46— 7,167 7,167 0.63 0.01— 7,187 Total 84.1 42.1 756 577 4.59 58.1— 58.1 58.1— 58.1— 912,464 912,464 80.8 1.72— 914,995 Daily,
Winter
(Max)
——————————————————
Single
Family
Housing

14.7 7.34 126 53.4 0.80 10.1— 10.1 10.1— 10.1— 159,342 159,342 14.1 0.30— 159,784 Apartme
nts
High Rise

1.68 0.84 14.4 6.12 0.09 1.16— 1.16 1.16— 1.16— 18,243 18,243 1.61 0.03— 18,293 Unrefrige
rated Warehou
se-No
Rail

66.5 33.3 605 508 3.63 46.0— 46.0 46.0— 46.0— 721,780 721,780 63.9 1.36— 723,782 Regional
Shopping
Center

0.55 0.27 4.97 4.18 0.03 0.38— 0.38 0.38— 0.38— 5,932 5,932 0.52 0.01— 5,949 1971
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 13 / 35
Office
Park

0.66 0.33 6.01 5.05 0.04 0.46 — 0.46 0.46 — 0.46 — 7,167 7,167 0.63 0.01 — 7,187 Total 84.1 42.1 756 577 4.59 58.1 — 58.1 58.1 — 58.1 — 912,464 912,464 80.8 1.72 — 914,995 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing

2.68 1.34 22.9 9.75 0.15 1.85 — 1.85 1.85 — 1.85 — 26,381 26,381 2.33 0.05 — 26,454 Apartme
nts
High Rise

0.31 0.15 2.62 1.12 0.02 0.21 — 0.21 0.21 — 0.21 — 3,020 3,020 0.27 0.01 — 3,029 Unrefrige
rated
Warehou
se-No
Rail

12.1 6.07 110 92.7 0.66 8.39 — 8.39 8.39 — 8.39 — 119,499 119,499 10.6 0.23 — 119,830 Regional
Shopping
Center

0.10 0.05 0.91 0.76 0.01 0.07 — 0.07 0.07 — 0.07 — 982 982 0.09 < 0.005 — 985 Office
Park

0.12 0.06 1.10 0.92 0.01 0.08 — 0.08 0.08 — 0.08 — 1,187 1,187 0.11 < 0.005 — 1,190 Total 15.4 7.68 138 105 0.84 10.6 — 10.6 10.6 — 10.6 — 151,069 151,069 13.4 0.28 — 151,488

4.3. Area Emissions by Source

4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 30.4 15.2 259 110 1.66 21.0 — 21.0 21.0 — 21.0 0.00 329,225 329,225 6.20 0.62 — 329,564 1972
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 14 / 35
Consum— 3,283————————————————
er
Products
Architect
ural
Coatings
— 20,038————————————————
Landsca
pe
Equipme
nt
1,047 969 55.8 6,330 0.36 7.61— 7.61 10.1— 10.1— 24,591 24,591 1.03 0.21— 24,680 Total 1,078 24,305 315 6,440 2.02 28.6— 28.6 31.0— 31.0 0.00 353,816 353,816 7.23 0.83— 354,244 Daily,
Winter
(Max)
——————————————————
Hearths 30.4 15.2 259 110 1.66 21.0— 21.0 21.0— 21.0 0.00 329,225 329,225 6.20 0.62— 329,564 Consum
er
Products
— 3,283————————————————
Architect
ural
Coatings
— 20,038————————————————
Total 30.4 23,336 259 110 1.66 21.0— 21.0 21.0— 21.0 0.00 329,225 329,225 6.20 0.62— 329,564 Annual——————————————————
Hearths 0.38 0.19 3.24 1.38 0.02 0.26— 0.26 0.26— 0.26 0.00 3,733 3,733 0.07 0.01— 3,737 Consum
er
Products
— 599————————————————
Architect
ural
Coatings
— 3,657————————————————
Landsca
pe
Equipme
nt
131 121 6.97 791 0.05 0.95— 0.95 1.26— 1.26— 2,789 2,789 0.12 0.02— 2,799 Total 131 4,377 10.2 793 0.07 1.21— 1.21 1.52— 1.52 0.00 6,522 6,522 0.19 0.03— 6,536 1973
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 15 / 35

4.4. Water Emissions by Land Use

4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — 1,090 19,782 20,872 114 2.88 — 24,570 Apartme
nts
High Rise
— — — — — — — — — — — 344 1,172 1,516 35.4 0.85 — 2,655 Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — 52,272 177,380 229,652 5,377 129 — 402,627 Regional
Shopping
Center
— — — — — — — — — — — 444 1,508 1,951 45.6 1.10 — 3,420 Office
Park
— — — — — — — — — — — 276 937 1,214 28.4 0.68 — 2,127
Total — — — — — — — — — — — 54,426 200,779 255,205 5,600 135 — 435,399 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — 1,090 19,782 20,872 114 2.88 — 24,570 Apartme
nts
High Rise
— — — — — — — — — — — 344 1,172 1,516 35.4 0.85 — 2,655 1974
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 16 / 35
Unrefrige
Warehouse-No
Rail
— — — — — — — — — — — 52,272 177,380 229,652 5,377 129 — 402,627 Regional
Shopping
Center
— — — — — — — — — — — 444 1,508 1,951 45.6 1.10 — 3,420 Office
Park
— — — — — — — — — — — 276 937 1,214 28.4 0.68 — 2,127
Total — — — — — — — — — — — 54,426 200,779 255,205 5,600 135 — 435,399 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — 180 3,275 3,456 18.8 0.48 — 4,068 Apartme
nts
High Rise
— — — — — — — — — — — 57.0 194 251 5.86 0.14 — 440
Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — 8,654 29,367 38,022 890 21.4 — 66,659 Regional
Shopping
Center
— — — — — — — — — — — 73.4 250 323 7.56 0.18 — 566
Office
Park
— — — — — — — — — — — 45.7 155 201 4.70 0.11 — 352
Total — — — — — — — — — — — 9,011 33,241 42,252 927 22.3 — 72,085

4.5. Waste Emissions by Land Use

4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 1975
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 17 / 35
Daily,
Summer
(Max)
——————————————————
Single
Family
Housing
——————————— 6,898 0.00 6,898 689 0.00— 24,135
Apartme
nts
High Rise
——————————— 1,759 0.00 1,759 176 0.00— 6,156
Unrefrige
rated Warehou
se-No
Rail
——————————— 59,760 0.00 59,760 5,973 0.00— 209,079
Regional
Shopping
Center
——————————— 1,769 0.00 1,769 177 0.00— 6,188
Office
Park
——————————— 406 0.00 406 40.6 0.00— 1,422
Total——————————— 70,593 0.00 70,593 7,055 0.00— 246,979 Daily,
Winter
(Max)
——————————————————
Single
Family
Housing
——————————— 6,898 0.00 6,898 689 0.00— 24,135
Apartme
nts
High Rise
——————————— 1,759 0.00 1,759 176 0.00— 6,156
Unrefrige
rated Warehou
se-No
Rail
——————————— 59,760 0.00 59,760 5,973 0.00— 209,079
Regional
Shopping
Center
——————————— 1,769 0.00 1,769 177 0.00— 6,188
1976
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 18 / 35
Office
Park
— — — — — — — — — — — 406 0.00 406 40.6 0.00 — 1,422
Total — — — — — — — — — — — 70,593 0.00 70,593 7,055 0.00 — 246,979 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — 1,142 0.00 1,142 114 0.00 — 3,996 Apartme
nts
High Rise
— — — — — — — — — — — 291 0.00 291 29.1 0.00 — 1,019
Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — 9,894 0.00 9,894 989 0.00 — 34,615 Regional
Shopping
Center
— — — — — — — — — — — 293 0.00 293 29.3 0.00 — 1,024
Office
Park
— — — — — — — — — — — 67.3 0.00 67.3 6.72 0.00 — 235
Total — — — — — — — — — — — 11,687 0.00 11,687 1,168 0.00 — 40,890

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — — — — — 195 195
1977
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 19 / 35
Apartme
High
Rise
———————————————— 30.4 30.4
Regional
Shopping
Center
———————————————— 15.0 15.0
Office
Park
———————————————— 1.97 1.97
Total———————————————— 243 243
Daily,
Winter
(Max)
——————————————————
Single
Family
Housing
———————————————— 195 195
Apartme
nts
High Rise
———————————————— 30.4 30.4
Regional
Shopping
Center
———————————————— 15.0 15.0
Office
Park
———————————————— 1.97 1.97
Total———————————————— 243 243
Annual——————————————————
Single
Family
Housing
———————————————— 32.3 32.3
Apartme
nts
High Rise
———————————————— 5.03 5.03
Regional
Shopping
Center
———————————————— 2.48 2.48
1978
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 20 / 35
Office — — — — — — — — — — — — — — — — 0.33 0.33
Park
Total — — — — — — — — — — — — — — — — 40.2 40.2

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
1979
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 21 / 35
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) 1980
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 22 / 35
Vegetatio TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e 1981
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 23 / 35
Daily,
Summer
(Max)
——————————————————
Avoided——————————————————
Subtotal——————————————————
Sequest
ered
——————————————————
Subtotal——————————————————
Remove d——————————————————
Subtotal——————————————————
———————————————————
Daily,
Winter
(Max)
——————————————————
Avoided——————————————————
Subtotal——————————————————
Sequest
ered
——————————————————
Subtotal——————————————————
Remove d——————————————————
Subtotal——————————————————
———————————————————
Annual——————————————————
Avoided——————————————————
Subtotal——————————————————
Sequest
ered
——————————————————
Subtotal——————————————————
1982
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 24 / 35
Remove — — — — — — — — — — — — — — — — — —
d
Subtotal — — — — — — — — — — — — — — — — — —
— — — — — — — — — — — — — — — — — — —

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Total all Land Uses 0.00 0.00 0.00 0.00 3,337,779 3,337,779 3,337,777 1,218,289,231

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Single Family Housing —
Wood Fireplaces 0
Gas Fireplaces 11883
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 1398
Conventional Wood Stoves 0
Catalytic Wood Stoves 699
Non-Catalytic Wood Stoves 699
1983
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 25 / 35
Pellet Wood Stoves 0
Apartments High Rise —
Wood Fireplaces 0
Gas Fireplaces 3753
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 442
Conventional Wood Stoves 0
Catalytic Wood Stoves 221
Non-Catalytic Wood Stoves 221
Pellet Wood Stoves 0

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
63786285 21,262,095 23,598,519,000 7,866,173,000 —

5.10.3. Landscape Equipment
Season Unit Value
Snow Days day/yr 0.00
Summer Days day/yr 250

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) 1984
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 26 / 35
Single Family Housing 130,562,627 349 0.0330 0.0040 497,189,110 Apartments High Rise 24,985,186 349 0.0330 0.0040 56,921,767 Unrefrigerated Warehouse-No
Rail
542,901,566 349 0.0330 0.0040 2,252,147,740
Regional Shopping Center 30,500,027 349 0.0330 0.0040 18,509,846 Office Park 14,140,325 349 0.0330 0.0040 22,363,149

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Single Family Housing 568,619,375 3,173,261,832
Apartments High Rise 179,574,717 821,368
Unrefrigerated Warehouse-No Rail 27,278,661,625 1,870,356 Regional Shopping Center 231,514,925 495,570
Office Park 144,080,041 128,526

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Single Family Housing 12,800 —
Apartments High Rise 3,265 —
Unrefrigerated Warehouse-No Rail 110,884 —
Regional Shopping Center 3,282 —
Office Park 754 —
1985
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 27 / 35

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Single Family Housing Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Single Family Housing Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00
Apartments High Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments High Rise Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00
Regional Shopping
Center
Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Regional Shopping
Center
Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00
Office Park Household refrigerators
and/or freezers
R-134a 1,430 0.02 0.60 0.00 1.00
Office Park Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.16. Stationary Sources
1986
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 28 / 35

5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor

5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr)

5.17. User Defined
Equipment Type Fuel Type
— —

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year) 1987
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 29 / 35

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
Temperature and Extreme Heat 19.8 annual days of extreme heat Extreme Precipitation 3.10 annual days with precipitation above 20 mm Sea Level Rise 0.00 meters of inundation depth
Wildfire 6.78 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider different increments of sea level rise coupled with extreme storm events. Users may select from four model simulations to view the range in potential inundation depth for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 50 meters (m) by 50 m, or about 164 feet (ft) by 164 ft.

Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 2 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
1988
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 30 / 35
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures.

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 2 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract 1989
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 31 / 35
Exposure Indicators—
AQ-Ozone 80.0
AQ-PM 93.5
AQ-DPM 49.8
Drinking Water 76.6
Lead Risk Housing 9.60
Pesticides 37.4
Toxic Releases 66.9
Traffic 8.64
Effect Indicators—
CleanUp Sites 25.6
Groundwater 0.00
Haz Waste Facilities/Generators 50.1
Impaired Water Bodies 51.2
Solid Waste 24.8
Sensitive Population—
Asthma 28.4
Cardio-vascular 87.2
Low Birth Weights 44.2
Socioeconomic Factor Indicators—
Education 42.7
Housing 21.1
Linguistic 30.0
Poverty 16.3
Unemployment 48.3

7.2. Healthy Places Index Scores
1990
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 32 / 35
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 81.6501989
Employed 87.36045169
Median HI 90.63261902
Education —
Bachelor's or higher 58.84768382
High school enrollment 10.95855255
Preschool enrollment 62.14551521
Transportation —
Auto Access 98.98626973
Active commuting 27.10124471
Social —
2-parent households 78.27537534
Voting 41.28063647
Neighborhood —
Alcohol availability 78.51918388
Park access 8.841267804
Retail density 22.75118696
Supermarket access 46.25946362
Tree canopy 10.58642371
Housing —
Homeownership 76.74836392
Housing habitability 90.92775568
Low-inc homeowner severe housing cost burden 73.38637239 Low-inc renter severe housing cost burden 85.73078404
Uncrowded housing 70.21686129 1991
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 33 / 35
Health Outcomes—
Insured adults 75.63197742
Arthritis 0.0
Asthma ER Admissions 71.7
High Blood Pressure 0.0
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 69.5
Cognitively Disabled 62.4
Physically Disabled 91.7
Heart Attack ER Admissions 16.1
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 19.6
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors—
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures—
Wildfire Risk 0.0
SLR Inundation Area 0.0
1992
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 34 / 35
Children 26.6
Elderly 75.4
English Speaking 40.6
Foreign-born 64.5
Outdoor Workers 81.0
Climate Change Adaptive Capacity —
Impervious Surface Cover 30.5
Traffic Density 12.6
Traffic Access 23.0
Other Indices —
Hardship 32.9
Other Decision Support —
2016 Voting 57.2

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 48.0 Healthy Places Index Score for Project Location (b) 73.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
1993
Eastvale GPU Existing 2022 condition Detailed Report, 6/20/2023 35 / 35
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data
Screen Justification
Land Use As per the information provided. Landscape area has been adjusted to match 1% of building SF Operations: Hearths No wood burning stoves
Operations: Architectural Coatings As per SCAQMD Rule 1113 1994
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 1 / 35
Eastvale GPU 2040 Conditions Detailed Report
Table of Contents

1. Basic Project Information

1.1. Basic Project Information

1.2. Land Use Types

1.3. User-Selected Emission Reduction Measures by Emissions Sector

2. Emissions Summary

2.4. Operations Emissions Compared Against Thresholds

2.5. Operations Emissions by Sector, Unmitigated

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated

4.2. Energy

4.2.1. Electricity Emissions By Land Use - Unmitigated

4.2.3. Natural Gas Emissions By Land Use - Unmitigated

4.3. Area Emissions by Source
1995
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 2 / 35

4.3.2. Unmitigated

4.4. Water Emissions by Land Use

4.4.2. Unmitigated

4.5. Waste Emissions by Land Use

4.5.2. Unmitigated

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated

4.7. Offroad Emissions By Equipment Type

4.7.1. Unmitigated

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated 1996
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 3 / 35

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated

5.10.2. Architectural Coatings

5.10.3. Landscape Equipment

5.11. Operational Energy Consumption

5.11.1. Unmitigated

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated

5.13. Operational Waste Generation

5.13.1. Unmitigated

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated

5.15. Operational Off-Road Equipment
1997
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 4 / 35

5.15.1. Unmitigated

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps

5.16.2. Process Boilers

5.17. User Defined

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated

5.18.2. Sequestration

5.18.2.1. Unmitigated

6. Climate Risk Detailed Report

6.1. Climate Risk Summary

6.2. Initial Climate Risk Scores

6.3. Adjusted Climate Risk Scores

6.4. Climate Risk Reduction Measures
1998
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 5 / 35

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores

7.2. Healthy Places Index Scores

7.3. Overall Health & Equity Scores

7.4. Health & Equity Measures

7.5. Evaluation Scorecard

7.6. Health & Equity Custom Measures

8. User Changes to Default Data
1999
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 6 / 35

1. Basic Project Information

1.1. Basic Project Information
Data Field Value
Project Name Eastvale GPU 2040 Conditions
Operational Year 2040
Lead Agency —
Land Use Scale Plan/community
Analysis Level for Defaults County
Windspeed (m/s) 2.60
Precipitation (days) 18.8
Location Eastvale, CA, USA
County Riverside-South Coast
City Eastvale
Air District South Coast AQMD
Air Basin South Coast
TAZ 5499
EDFZ 11
Electric Utility Southern California Edison
Gas Utility Southern California Gas
App Version 2022.1.1.14

1.2. Land Use Types
Land Use Subtype Size Unit Lot Acreage Building Area (sq ft) Landscape Area (sq ft)
Special Landscape
Area (sq ft)
Population Description
Single Family
Housing
17,160 Dwelling Unit 5,571 33,462,000 200,992,626 — 55,427 — 2000
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 7 / 35
Apartments High
Rise
5,409 Dwelling Unit 87.2 5,192,640 51,926 — 17,471 —
Office Park 3,130 1000sqft 1,000 3,129,895 31,298 — — — Unrefrigerated
Warehouse-No Rail
13,586 1000sqft 1,000 13,586,438 135,964 — — —
Regional Shopping
Center
5,211 1000sqft 1,000 5,211,127 52,111 — — —

1.3. User-Selected Emission Reduction Measures by Emissions Sector No measures selected

2. Emissions Summary

2.4. Operations Emissions Compared Against Thresholds
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Un/Mit. TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 407 29,496 1,232 10,113 38.3 62.3 3,782 3,844 61.4 959 1,020 31,609 4,563,99 5 4,595,60
4 3,330 141 2,438 4,723,16
3 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 400 29,491 1,283 7,922 36.0 62.3 3,782 3,844 61.4 959 1,020 31,609 4,336,11 1 4,367,72
0 3,328 144 365 4,494,19
9 Average
Daily
(Max)
— — — — — — — — — — — — — — — — — —
Unmit. 365 29,474 1,004 8,114 34.4 38.3 3,782 3,820 37.5 959 996 31,609 3,992,76 1 4,024,37
0 3,321 144 1,229 4,151,68
1 Annual
(Max)
— — — — — — — — — — — — — — — — — —
2001
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 8 / 35
Unmit. 66.7 5,379 183 1,481 6.29 7.00 690 697 6.84 175 182 5,233 661,047 666,280 550 23.9 203 687,358

2.5. Operations Emissions by Sector, Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Sector TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 338 246 641 9,819 34.5 15.0 3,782 3,797 14.1 959 973 — 3,525,92 7 3,525,92
7 70.6 111 2,129 3,562,97
4 Area 37.2 29,234 318 135 2.03 25.7 — 25.7 25.7 — 25.7 0.00 403,929 403,929 7.61 0.76 — 404,346 Energy 31.2 15.6 273 158 1.70 21.6 — 21.6 21.6 — 21.6 — 595,024 595,024 62.4 4.57 — 597,947 Water — — — — — — — — — — — 9,585 39,115 48,700 988 24.0 — 80,533 Waste — — — — — — — — — — — 22,024 0.00 22,024 2,201 0.00 — 77,054 Refrig. — — — — — — — — — — — — — — — — 309 309
Total 407 29,496 1,232 10,113 38.3 62.3 3,782 3,844 61.4 959 1,020 31,609 4,563,99 5 4,595,60
4 3,330 141 2,438 4,723,16
3 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Mobile 331 241 692 7,628 32.3 15.0 3,782 3,797 14.1 959 973 — 3,298,04 3 3,298,04
3 69.1 115 55.2 3,334,01
0 Area 37.2 29,234 318 135 2.03 25.7 — 25.7 25.7 — 25.7 0.00 403,929 403,929 7.61 0.76 — 404,346 Energy 31.2 15.6 273 158 1.70 21.6 — 21.6 21.6 — 21.6 — 595,024 595,024 62.4 4.57 — 597,947 Water — — — — — — — — — — — 9,585 39,115 48,700 988 24.0 — 80,533 Waste — — — — — — — — — — — 22,024 0.00 22,024 2,201 0.00 — 77,054 Refrig. — — — — — — — — — — — — — — — — 309 309
Total 400 29,491 1,283 7,922 36.0 62.3 3,782 3,844 61.4 959 1,020 31,609 4,336,11 1 4,367,72
0 3,328 144 365 4,494,19
9 2002
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 9 / 35
Average — — — — — — — — — — — — — — — — — —
Daily
Mobile 331 241 709 7,947 32.6 15.0 3,782 3,797 14.1 959 973 — 3,330,95 5 3,330,95
5 69.2 116 919 3,368,14
3 Area 2.55 29,217 21.8 9.27 0.14 1.76 — 1.76 1.76 — 1.76 0.00 27,666 27,666 0.52 0.05 — 27,695 Energy 31.2 15.6 273 158 1.70 21.6 — 21.6 21.6 — 21.6 — 595,024 595,024 62.4 4.57 — 597,947 Water — — — — — — — — — — — 9,585 39,115 48,700 988 24.0 — 80,533 Waste — — — — — — — — — — — 22,024 0.00 22,024 2,201 0.00 — 77,054 Refrig. — — — — — — — — — — — — — — — — 309 309
Total 365 29,474 1,004 8,114 34.4 38.3 3,782 3,820 37.5 959 996 31,609 3,992,76 1 4,024,37
0 3,321 144 1,229 4,151,68
1 Annual — — — — — — — — — — — — — — — — — —
Mobile 60.5 44.0 129 1,450 5.95 2.74 690 693 2.58 175 178 — 551,478 551,478 11.4 19.2 152 557,634 Area 0.47 5,332 3.98 1.69 0.03 0.32 — 0.32 0.32 — 0.32 0.00 4,580 4,580 0.09 0.01 — 4,585 Energy 5.70 2.85 49.8 28.8 0.31 3.94 — 3.94 3.94 — 3.94 — 98,513 98,513 10.3 0.76 — 98,997 Water — — — — — — — — — — — 1,587 6,476 8,063 164 3.97 — 13,333 Waste — — — — — — — — — — — 3,646 0.00 3,646 364 0.00 — 12,757 Refrig. — — — — — — — — — — — — — — — — 51.2 51.2
Total 66.7 5,379 183 1,481 6.29 7.00 690 697 6.84 175 182 5,233 661,047 666,280 550 23.9 203 687,358

4. Operations Emissions Details

4.1. Mobile Emissions by Land Use

4.1.1. Unmitigated
Mobile source emissions results are presented in Sections 2.6. No further detailed breakdown of emissions is available.

4.2. Energy
2003
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 10 / 35

4.2.1. Electricity Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — 114,505 114,505 14.5 1.76 — 115,390 Apartme
nts
High Rise
— — — — — — — — — — — — 21,871 21,871 2.77 0.34 — 22,040 Office
Park
— — — — — — — — — — — — 39,008 39,008 4.94 0.60 — 39,309 Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — — 44,677 44,677 5.65 0.69 — 45,022 Regional
Shopping
Center
— — — — — — — — — — — — 36,333 36,333 4.60 0.56 — 36,614 Total — — — — — — — — — — — — 256,393 256,393 32.4 3.93 — 258,376 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — 114,505 114,505 14.5 1.76 — 115,390 Apartme
nts
High Rise
— — — — — — — — — — — — 21,871 21,871 2.77 0.34 — 22,040 Office
Park
— — — — — — — — — — — — 39,008 39,008 4.94 0.60 — 39,309 2004
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 11 / 35
Unrefrige
Warehouse-No
Rail
— — — — — — — — — — — — 44,677 44,677 5.65 0.69 — 45,022 Regional
Shopping
Center
— — — — — — — — — — — — 36,333 36,333 4.60 0.56 — 36,614 Total — — — — — — — — — — — — 256,393 256,393 32.4 3.93 — 258,376 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — 18,958 18,958 2.40 0.29 — 19,104 Apartme
nts
High Rise
— — — — — — — — — — — — 3,621 3,621 0.46 0.06 — 3,649
Office
Park
— — — — — — — — — — — — 6,458 6,458 0.82 0.10 — 6,508
Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — — 7,397 7,397 0.94 0.11 — 7,454
Regional
Shopping
Center
— — — — — — — — — — — — 6,015 6,015 0.76 0.09 — 6,062
Total — — — — — — — — — — — — 42,449 42,449 5.37 0.65 — 42,777

4.2.3. Natural Gas Emissions By Land Use - Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2005
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 12 / 35
Single 18.0 9.02 154 65.6 0.98 12.5— 12.5 12.5— 12.5— 195,587 195,587 17.3 0.37— 196,129 Family
Housing
Apartme
nts
High Rise

2.06 1.03 17.6 7.49 0.11 1.42— 1.42 1.42— 1.42— 22,350 22,350 1.98 0.04— 22,412 Office
Park

2.55 1.28 23.2 19.5 0.14 1.76— 1.76 1.76— 1.76— 27,672 27,672 2.45 0.05— 27,749 Unrefrige
rated Warehou
se-No
Rail

7.66 3.83 69.7 58.5 0.42 5.30— 5.30 5.30— 5.30— 83,132 83,132 7.36 0.16— 83,363 Regional
Shopping
Center

0.91 0.46 8.29 6.96 0.05 0.63— 0.63 0.63— 0.63— 9,891 9,891 0.88 0.02— 9,918 Total 31.2 15.6 273 158 1.70 21.6— 21.6 21.6— 21.6— 338,631 338,631 30.0 0.64— 339,570 Daily,
Winter
(Max)
——————————————————
Single
Family
Housing

18.0 9.02 154 65.6 0.98 12.5— 12.5 12.5— 12.5— 195,587 195,587 17.3 0.37— 196,129 Apartme
nts
High Rise

2.06 1.03 17.6 7.49 0.11 1.42— 1.42 1.42— 1.42— 22,350 22,350 1.98 0.04— 22,412 Office
Park

2.55 1.28 23.2 19.5 0.14 1.76— 1.76 1.76— 1.76— 27,672 27,672 2.45 0.05— 27,749 Unrefrige
rated Warehou
se-No
Rail

7.66 3.83 69.7 58.5 0.42 5.30— 5.30 5.30— 5.30— 83,132 83,132 7.36 0.16— 83,363 Regional
Shopping
Center

0.91 0.46 8.29 6.96 0.05 0.63— 0.63 0.63— 0.63— 9,891 9,891 0.88 0.02— 9,918 2006
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 13 / 35
Total 31.2 15.6 273 158 1.70 21.6 — 21.6 21.6 — 21.6 — 338,631 338,631 30.0 0.64 — 339,570 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing

3.29 1.65 28.1 12.0 0.18 2.27 — 2.27 2.27 — 2.27 — 32,382 32,382 2.87 0.06 — 32,471 Apartme
nts
High Rise

0.38 0.19 3.21 1.37 0.02 0.26 — 0.26 0.26 — 0.26 — 3,700 3,700 0.33 0.01 — 3,711 Office
Park

0.47 0.23 4.23 3.56 0.03 0.32 — 0.32 0.32 — 0.32 — 4,581 4,581 0.41 0.01 — 4,594 Unrefrige
rated
Warehou
se-No
Rail

1.40 0.70 12.7 10.7 0.08 0.97 — 0.97 0.97 — 0.97 — 13,763 13,763 1.22 0.03 — 13,802 Regional
Shopping
Center

0.17 0.08 1.51 1.27 0.01 0.11 — 0.11 0.11 — 0.11 — 1,637 1,637 0.14 < 0.005 — 1,642 Total 5.70 2.85 49.8 28.8 0.31 3.94 — 3.94 3.94 — 3.94 — 56,064 56,064 4.96 0.11 — 56,220

4.3. Area Emissions by Source

4.3.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Source TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 37.2 18.6 318 135 2.03 25.7 — 25.7 25.7 — 25.7 0.00 403,929 403,929 7.61 0.76 — 404,346 Consum
er
Products
— 1,296 — — — — — — — — — — — — — — — —
2007
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 14 / 35
Architect — 27,919 — — — — — — — — — — — — — — — —
ural
Total 37.2 29,234 318 135 2.03 25.7 — 25.7 25.7 — 25.7 0.00 403,929 403,929 7.61 0.76 — 404,346 Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Hearths 37.2 18.6 318 135 2.03 25.7 — 25.7 25.7 — 25.7 0.00 403,929 403,929 7.61 0.76 — 404,346 Consum
er
Products
— 1,296 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 27,919 — — — — — — — — — — — — — — — —
Total 37.2 29,234 318 135 2.03 25.7 — 25.7 25.7 — 25.7 0.00 403,929 403,929 7.61 0.76 — 404,346 Annual — — — — — — — — — — — — — — — — — —
Hearths 0.47 0.23 3.98 1.69 0.03 0.32 — 0.32 0.32 — 0.32 0.00 4,580 4,580 0.09 0.01 — 4,585 Consum
er
Products
— 237 — — — — — — — — — — — — — — — —
Architect
ural
Coatings
— 5,095 — — — — — — — — — — — — — — — —
Total 0.47 5,332 3.98 1.69 0.03 0.32 — 0.32 0.32 — 0.32 0.00 4,580 4,580 0.09 0.01 — 4,585

4.4. Water Emissions by Land Use

4.4.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
2008
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 15 / 35
Single
Family
Housing
——————————— 1,337 18,163 19,501 139 3.54— 24,041
Apartme
nts
High Rise
——————————— 422 1,074 1,495 43.4 1.04— 2,891
Office
Park
——————————— 1,066 2,708 3,774 110 2.64— 7,301
Unrefrige
rated Warehou
se-No
Rail
——————————— 6,021 15,289 21,310 619 14.9— 41,233
Regional
Shopping
Center
——————————— 740 1,881 2,620 76.1 1.83— 5,068
Total——————————— 9,585 39,115 48,700 988 24.0— 80,533
Daily,
Winter
(Max)
——————————————————
Single
Family
Housing
——————————— 1,337 18,163 19,501 139 3.54— 24,041
Apartme
nts
High Rise
——————————— 422 1,074 1,495 43.4 1.04— 2,891
Office
Park
——————————— 1,066 2,708 3,774 110 2.64— 7,301
Unrefrige
rated Warehou
se-No
Rail
——————————— 6,021 15,289 21,310 619 14.9— 41,233
Regional
Shopping
Center
——————————— 740 1,881 2,620 76.1 1.83— 5,068
2009
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 16 / 35
Total — — — — — — — — — — — 9,585 39,115 48,700 988 24.0 — 80,533 Annual — — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — 221 3,007 3,229 23.1 0.59 — 3,980 Apartme
nts
High Rise
— — — — — — — — — — — 69.8 178 248 7.18 0.17 — 479
Office
Park
— — — — — — — — — — — 176 448 625 18.2 0.44 — 1,209
Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — 997 2,531 3,528 103 2.47 — 6,827
Regional
Shopping
Center
— — — — — — — — — — — 122 311 434 12.6 0.30 — 839
Total — — — — — — — — — — — 1,587 6,476 8,063 164 3.97 — 13,333

4.5. Waste Emissions by Land Use

4.5.2. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — 8,468 0.00 8,468 846 0.00 — 29,626 2010
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 17 / 35
Apartme——————————— 2,156 0.00 2,156 215 0.00— 7,542
nts
High Rise
Office
Park
——————————— 1,569 0.00 1,569 157 0.00— 5,489
Unrefrige
rated Warehou
se-No
Rail
——————————— 6,883 0.00 6,883 688 0.00— 24,081
Regional
Shopping
Center
——————————— 2,949 0.00 2,949 295 0.00— 10,317
Total——————————— 22,024 0.00 22,024 2,201 0.00— 77,054
Daily,
Winter
(Max)
——————————————————
Single
Family
Housing
——————————— 8,468 0.00 8,468 846 0.00— 29,626
Apartme
nts
High Rise
——————————— 2,156 0.00 2,156 215 0.00— 7,542
Office
Park
——————————— 1,569 0.00 1,569 157 0.00— 5,489
Unrefrige
rated Warehou
se-No
Rail
——————————— 6,883 0.00 6,883 688 0.00— 24,081
Regional
Shopping
Center
——————————— 2,949 0.00 2,949 295 0.00— 10,317
Total——————————— 22,024 0.00 22,024 2,201 0.00— 77,054
Annual——————————————————
2011
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 18 / 35
Single — — — — — — — — — — — 1,402 0.00 1,402 140 0.00 — 4,905 Family
Housing
Apartme
nts
High Rise
— — — — — — — — — — — 357 0.00 357 35.7 0.00 — 1,249
Office
Park
— — — — — — — — — — — 260 0.00 260 26.0 0.00 — 909
Unrefrige
rated
Warehou
se-No
Rail
— — — — — — — — — — — 1,140 0.00 1,140 114 0.00 — 3,987 Regional
Shopping
Center
— — — — — — — — — — — 488 0.00 488 48.8 0.00 — 1,708
Total — — — — — — — — — — — 3,646 0.00 3,646 364 0.00 — 12,757

4.6. Refrigerant Emissions by Land Use

4.6.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Single
Family
Housing
— — — — — — — — — — — — — — — — 240 240
Apartme
nts
High Rise
— — — — — — — — — — — — — — — — 37.2 37.2
Office
Park
— — — — — — — — — — — — — — — — 7.61 7.61
2012
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 19 / 35
Regional
Shopping
Center
———————————————— 25.0 25.0
Total———————————————— 309 309
Daily,
Winter
(Max)
——————————————————
Single
Family
Housing
———————————————— 240 240
Apartme
nts
High Rise
———————————————— 37.2 37.2
Office
Park
———————————————— 7.61 7.61
Regional
Shopping
Center
———————————————— 25.0 25.0
Total———————————————— 309 309
Annual——————————————————
Single
Family
Housing
———————————————— 39.7 39.7
Apartme
nts
High Rise
———————————————— 6.16 6.16
Office
Park
———————————————— 1.26 1.26
Regional
Shopping
Center
———————————————— 4.14 4.14
Total———————————————— 51.2 51.2

4.7. Offroad Emissions By Equipment Type
2013
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 20 / 35

4.7.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.8. Stationary Emissions By Equipment Type

4.8.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
2014
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 21 / 35
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.9. User Defined Emissions By Equipment Type

4.9.1. Unmitigated
Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Equipme
nt
Type
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10. Soil Carbon Accumulation By Vegetation Type

4.10.1. Soil Carbon Accumulation By Vegetation Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Vegetatio
n
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
2015
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 22 / 35
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.2. Above and Belowground Carbon Accumulation by Land Use Type - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Land
Use
TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Daily,
Winter
(Max)
— — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —
Annual — — — — — — — — — — — — — — — — — —
Total — — — — — — — — — — — — — — — — — —

4.10.3. Avoided and Sequestered Emissions by Species - Unmitigated Criteria Pollutants (lb/day for daily, ton/yr for annual) and GHGs (lb/day for daily, MT/yr for annual) Species TOG ROG NOx CO SO2 PM10E PM10D PM10T PM2.5E PM2.5D PM2.5T BCO2 NBCO2 CO2T CH4 N2O R CO2e Daily,
Summer
(Max)
— — — — — — — — — — — — — — — — — —
Avoided — — — — — — — — — — — — — — — — — —
Subtotal — — — — — — — — — — — — — — — — — —
2016
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 23 / 35
Sequest——————————————————
Subtotal——————————————————
Remove d——————————————————
Subtotal——————————————————
———————————————————
Daily,
Winter
(Max)
——————————————————
Avoided——————————————————
Subtotal——————————————————
Sequest
ered
——————————————————
Subtotal——————————————————
Remove d——————————————————
Subtotal——————————————————
———————————————————
Annual——————————————————
Avoided——————————————————
Subtotal——————————————————
Sequest
ered
——————————————————
Subtotal——————————————————
Remove d——————————————————
Subtotal——————————————————
———————————————————
2017
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 24 / 35

5. Activity Data

5.9. Operational Mobile Sources

5.9.1. Unmitigated
Land Use Type Trips/Weekday Trips/Saturday Trips/Sunday Trips/Year VMT/Weekday VMT/Saturday VMT/Sunday VMT/Year Total all Land Uses 0.00 0.00 0.00 0.00 5,354,161 5,354,161 5,354,161 1,954,268,765

5.10. Operational Area Sources

5.10.1. Hearths

5.10.1.1. Unmitigated
Hearth Type Unmitigated (number)
Single Family Housing —
Wood Fireplaces 0
Gas Fireplaces 14586
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 1716
Conventional Wood Stoves 0
Catalytic Wood Stoves 858
Non-Catalytic Wood Stoves 858
Pellet Wood Stoves 0
Apartments High Rise —
Wood Fireplaces 0
Gas Fireplaces 4598
2018
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 25 / 35
Propane Fireplaces 0
Electric Fireplaces 0
No Fireplaces 541
Conventional Wood Stoves 0
Catalytic Wood Stoves 270
Non-Catalytic Wood Stoves 270
Pellet Wood Stoves 0

5.10.2. Architectural Coatings
Residential Interior Area Coated (sq ft) Residential Exterior Area Coated (sq ft) Non-Residential Interior Area Coated (sq ft)
Non-Residential Exterior Area Coated
(sq ft)
Parking Area Coated (sq ft)
78275646 26,091,882 32,891,190,000 10,963,730,000 —

5.10.3. Landscape Equipment
Equipment Type Fuel Type Number Per Day Hours per Day Hours per Year Horsepower Load Factor

5.11. Operational Energy Consumption

5.11.1. Unmitigated
Electricity (kWh/yr) and CO2 and CH4 and N2O and Natural Gas (kBTU/yr) Land Use Electricity (kWh/yr) CO2 CH4 N2O Natural Gas (kBTU/yr) Single Family Housing 160,261,422 261 0.0330 0.0040 610,283,629 Apartments High Rise 30,610,390 261 0.0330 0.0040 69,737,222 Office Park 54,595,297 261 0.0330 0.0040 86,343,331
Unrefrigerated Warehouse-No
Rail
62,529,562 261 0.0330 0.0040 259,394,743
Regional Shopping Center 50,852,231 261 0.0330 0.0040 30,861,185 2019
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 26 / 35

5.12. Operational Water and Wastewater Consumption

5.12.1. Unmitigated
Land Use Indoor Water (gal/year) Outdoor Water (gal/year) Single Family Housing 697,961,979 3,895,076,750
Apartments High Rise 220,004,449 1,006,284
Office Park 556,287,969 496,252
Unrefrigerated Warehouse-No Rail 3,141,863,788 2,155,806 Regional Shopping Center 386,001,317 826,257

5.13. Operational Waste Generation

5.13.1. Unmitigated
Land Use Waste (ton/year) Cogeneration (kWh/year)
Single Family Housing 15,712 —
Apartments High Rise 4,000 —
Office Park 2,911 —
Unrefrigerated Warehouse-No Rail 12,771 —
Regional Shopping Center 5,472 —

5.14. Operational Refrigeration and Air Conditioning Equipment

5.14.1. Unmitigated
Land Use Type Equipment Type Refrigerant GWP Quantity (kg) Operations Leak Rate Service Leak Rate Times Serviced Single Family Housing Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
2020
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 27 / 35
Single Family Housing Household refrigerators R-134a 1,430 0.12 0.60 0.00 1.00 and/or freezers
Apartments High Rise Average room A/C &
Other residential A/C
and heat pumps
R-410A 2,088 < 0.005 2.50 2.50 10.0
Apartments High Rise Household refrigerators
and/or freezers
R-134a 1,430 0.12 0.60 0.00 1.00
Office Park Household refrigerators
and/or freezers
R-134a 1,430 0.02 0.60 0.00 1.00
Office Park Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Regional Shopping
Center
Other commercial A/C
and heat pumps
R-410A 2,088 < 0.005 4.00 4.00 18.0
Regional Shopping
Center
Stand-alone retail
refrigerators and
freezers
R-134a 1,430 0.04 1.00 0.00 1.00

5.15. Operational Off-Road Equipment

5.15.1. Unmitigated
Equipment Type Fuel Type Engine Tier Number per Day Hours Per Day Horsepower Load Factor

5.16. Stationary Sources

5.16.1. Emergency Generators and Fire Pumps
Equipment Type Fuel Type Number per Day Hours per Day Hours per Year Horsepower Load Factor

5.16.2. Process Boilers
Equipment Type Fuel Type Number Boiler Rating (MMBtu/hr) Daily Heat Input (MMBtu/day) Annual Heat Input (MMBtu/yr) 2021
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 28 / 35

5.17. User Defined
Equipment Type Fuel Type
— —

5.18. Vegetation

5.18.1. Land Use Change

5.18.1.1. Unmitigated
Vegetation Land Use Type Vegetation Soil Type Initial Acres Final Acres

5.18.1. Biomass Cover Type

5.18.1.1. Unmitigated
Biomass Cover Type Initial Acres Final Acres

5.18.2. Sequestration

5.18.2.1. Unmitigated
Tree Type Number Electricity Saved (kWh/year) Natural Gas Saved (btu/year)

6. Climate Risk Detailed Report

6.1. Climate Risk Summary
Cal-Adapt midcentury 2040–2059 average projections for four hazards are reported below for your project location. These are under Representation Concentration Pathway (RCP) 8.5 which assumes GHG emissions will continue to rise strongly through 2050 and then plateau around 2100.

Climate Hazard Result for Project Location Unit
2022
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 29 / 35
Temperature and Extreme Heat 19.8 annual days of extreme heat Extreme Precipitation 3.10 annual days with precipitation above 20 mm Sea Level Rise 0.00 meters of inundation depth
Wildfire 6.78 annual hectares burned
Temperature and Extreme Heat data are for grid cell in which your project are located. The projection is based on the 98th historical percentile of daily maximum/minimum temperatures from observed historical data (32 climate model ensemble from Cal-Adapt, 2040–2059 average under RCP 8.5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Extreme Precipitation data are for the grid cell in which your project are located. The threshold of 20 mm is equivalent to about ¾ an inch of rain, which would be light to moderate rainfall if received over a full day or heavy rain if received over a period of 2 to 4 hours. Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

Sea Level Rise data are for the grid cell in which your project are located. The projections are from Radke et al. (2017), as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider different increments of sea level rise coupled with extreme storm events. Users may select from four model simulations to view the range in potential inundation depth for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 50 meters (m) by 50 m, or about 164 feet (ft) by 164 ft.

Wildfire data are for the grid cell in which your project are located. The projections are from UC Davis, as reported in Cal-Adapt (2040–2059 average under RCP 8.5), and consider historical data of climate, vegetation, population density, and large (> 400 ha) fire history. Users may select from four model simulations to view the range in potential wildfire probabilities for the grid cell. The four simulations make different assumptions about expected rainfall and temperature are: Warmer/drier (HadGEM2-ES), Cooler/wetter (CNRM-CM5), Average conditions (CanESM2), Range of different rainfall and temperature possibilities (MIROC5). Each grid cell is 6 kilometers (km) by 6 km, or 3.7 miles (mi) by 3.7 mi.

6.2. Initial Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 2 0 0 N/A
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 0 0 N/A
Wildfire 1 0 0 N/A
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 0 0 0 N/A
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores do not include implementation of climate risk reduction measures. 2023
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 30 / 35

6.3. Adjusted Climate Risk Scores
Climate Hazard Exposure Score Sensitivity Score Adaptive Capacity Score Vulnerability Score Temperature and Extreme Heat 2 1 1 3
Extreme Precipitation N/A N/A N/A N/A
Sea Level Rise 1 1 1 2
Wildfire 1 1 1 2
Flooding N/A N/A N/A N/A
Drought N/A N/A N/A N/A
Snowpack Reduction N/A N/A N/A N/A
Air Quality Degradation 1 1 1 2
The sensitivity score reflects the extent to which a project would be adversely affected by exposure to a climate hazard. Exposure is rated on a scale of 1 to 5, with a score of 5 representing the greatest exposure.

The adaptive capacity of a project refers to its ability to manage and reduce vulnerabilities from projected climate hazards. Adaptive capacity is rated on a scale of 1 to 5, with a score of 5 representing the greatest ability to adapt.

The overall vulnerability scores are calculated based on the potential impacts and adaptive capacity assessments for each hazard. Scores include implementation of climate risk reduction measures.

6.4. Climate Risk Reduction Measures

7. Health and Equity Details

7.1. CalEnviroScreen 4.0 Scores
The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state.

Indicator Result for Project Census Tract
Exposure Indicators —
AQ-Ozone 80.0
AQ-PM 93.5
AQ-DPM 49.8
Drinking Water 76.6
Lead Risk Housing 9.60 2024
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 31 / 35
Pesticides 37.4
Toxic Releases 66.9
Traffic 8.64
Effect Indicators —
CleanUp Sites 25.6
Groundwater 0.00
Haz Waste Facilities/Generators 50.1
Impaired Water Bodies 51.2
Solid Waste 24.8
Sensitive Population —
Asthma 28.4
Cardio-vascular 87.2
Low Birth Weights 44.2
Socioeconomic Factor Indicators —
Education 42.7
Housing 21.1
Linguistic 30.0
Poverty 16.3
Unemployment 48.3

7.2. Healthy Places Index Scores
The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

Indicator Result for Project Census Tract
Economic —
Above Poverty 81.6501989
Employed 87.36045169
Median HI 90.63261902
2025
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 32 / 35
Education—
Bachelor's or higher 58.84768382
High school enrollment 10.95855255
Preschool enrollment 62.14551521
Transportation—
Auto Access 98.98626973
Active commuting 27.10124471
Social—
2-parent households 78.27537534
Voting 41.28063647
Neighborhood—
Alcohol availability 78.51918388
Park access 8.841267804
Retail density 22.75118696
Supermarket access 46.25946362
Tree canopy 10.58642371
Housing—
Homeownership 76.74836392
Housing habitability 90.92775568
Low-inc homeowner severe housing cost burden 73.38637239 Low-inc renter severe housing cost burden 85.73078404
Uncrowded housing 70.21686129
Health Outcomes—
Insured adults 75.63197742
Arthritis 0.0
Asthma ER Admissions 71.7
High Blood Pressure 0.0
2026
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 33 / 35
Cancer (excluding skin) 0.0
Asthma 0.0
Coronary Heart Disease 0.0
Chronic Obstructive Pulmonary Disease 0.0
Diagnosed Diabetes 0.0
Life Expectancy at Birth 69.5
Cognitively Disabled 62.4
Physically Disabled 91.7
Heart Attack ER Admissions 16.1
Mental Health Not Good 0.0
Chronic Kidney Disease 0.0
Obesity 0.0
Pedestrian Injuries 19.6
Physical Health Not Good 0.0
Stroke 0.0
Health Risk Behaviors—
Binge Drinking 0.0
Current Smoker 0.0
No Leisure Time for Physical Activity 0.0
Climate Change Exposures—
Wildfire Risk 0.0
SLR Inundation Area 0.0
Children 26.6
Elderly 75.4
English Speaking 40.6
Foreign-born 64.5
Outdoor Workers 81.0
2027
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 34 / 35
Climate Change Adaptive Capacity —
Impervious Surface Cover 30.5
Traffic Density 12.6
Traffic Access 23.0
Other Indices —
Hardship 32.9
Other Decision Support —
2016 Voting 57.2

7.3. Overall Health & Equity Scores
Metric Result for Project Census Tract
CalEnviroScreen 4.0 Score for Project Location (a) 48.0 Healthy Places Index Score for Project Location (b) 73.0 Project Located in a Designated Disadvantaged Community (Senate Bill 535) No Project Located in a Low-Income Community (Assembly Bill 1550) No Project Located in a Community Air Protection Program Community (Assembly Bill 617) No a: The maximum CalEnviroScreen score is 100. A high score (i.e., greater than 50) reflects a higher pollution burden compared to other census tracts in the state. b: The maximum Health Places Index score is 100. A high score (i.e., greater than 50) reflects healthier community conditions compared to other census tracts in the state.

7.4. Health & Equity Measures
No Health & Equity Measures selected.

7.5. Evaluation Scorecard
Health & Equity Evaluation Scorecard not completed.

7.6. Health & Equity Custom Measures
No Health & Equity Custom Measures created.

8. User Changes to Default Data
2028
Eastvale GPU 2040 Conditions Detailed Report, 6/20/2023 35 / 35
Screen Justification
Land Use As per the information provided. Landscape area is assumed to be 1% of the building SF.

Operations: Hearths No wood burning stoves
Operations: Architectural Coatings As per SCAQMD Rule 1113 2029
Eastvale 2040 General Plan Update
Energy Calculations
(kBTU/yr) (Therms) (kWh/yr) (MWh/yr)
Existing Conditions 2,847,131,612.00 28,471,316.12 743,089,731.00 743,089.73Buildout Conditions 1,056,620,110 10,566,201 364,848,902 364,849 Net Change -1,790,511,502 -17,905,115 -378,240,829 -378,241 1 kBTU = 0.01 therms
Electricity (MWh)
Existing Conditions 743,090 16,767,235 4.4318%
Buildout Conditions 364,849 16,767,235 2.1760%
Net Change -378,241 16,767,235 -2.2558%
Natural Gas (Therms)
Existing Conditions 28,471,316 430,843,598 6.6083%
Buildout Conditions 10,566,201 430,843,598 2.4524%
Net Change -17,905,115 430,843,598 -4.1558%
Source: Refer to CalEEMod outputs for assumptions used in this analysis.

Land Use
Natural Gas Use Electricity Use
Energy Type Project Annual Energy
Consumption
Riverside County Annual
Energy Consumption
(2021) Percentage Increase
Countywide
2030
Eastvale 2040 General Plan Update
Energy Calculations
2031
Eastvale 2040 General Plan Update
Energy Calculations
Existing Condition
Vehicle Type Percent of Vehicle Trips1 Annual Vehicle Miles Traveled Average Fuel
Economy (miles per
gallon)3
Total Annual Fuel
Consumption
(gallons)4
Passenger Cars 0.54 1,795,361 22 81,607
Light/Medium Trucks 0.42 1,411,884 17.3 81,612
Heavy Trucks/Other 0.04 130,534 6.4 20,396 Existing County Fuel (2022) TOTAL 6 1.00 3,337,779 -- 183,615 775,477,014

0.0237%
Build‐out Condition
Vehicle Type Percent of Vehicle Trips1 Annual Vehicle Miles Traveled Average Fuel
Economy (miles per
gallon)3
Total Annual Fuel
Consumption
(gallons)4
Passenger Cars 0.54 2,879,955 22 130,907 BuildioutLight/Medium Trucks 0.42 2,264,815 17.3 130,914 0.0331%Heavy Trucks/Other 0.04 209,391 6.4 32,717 TOTAL 6 1.00 5,354,161 -- 294,539 Buildout‐Existing
110,923
County On‐Road
2040
890,205,185

4. Total Daily Fuel Consumption calculated by dividing the daily VMT by the average fuel economy (i.e., VMT/Average Fuel Economy). 0.0125%5. Values may be slightly off due to rounding.Source: Refer to CalEEMod outputs for assumptions used in this analysis. Source: Refer to CalEEMod outputs for assumptions used in this analysis. Notes: 1. Percent of Vehicle Trip distribution based on trip characteristics within the CalEEMod model.2. Daily Trips taken from ITE manual.3. Average fuel economy derived from the Department of Transportation.5. Values may be slightly off due to rounding.Notes: 1. Percent of Vehicle Trip distribution based on trip characteristics within the CalEEMod model.2. Daily Trips taken from ITE manual.3. Average fuel economy derived from the Department of Transportation.4. Total Daily Fuel Consumption calculated by dividing the daily VMT by the average fuel economy (i.e., VMT/Average Fuel Economy). 2032

APPENDIX C
Noise Data
2033
Site Number: NM-1
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/16/22
Time: 9:00 a.m.

Location: Southeast Corner of Sharp Street and Riverside Drive Source of Ambient Noise: Traffic noise along I-15, Riverside Drive and Sharp Street.

Source of Peak Noise: Cargo trucks traffic noise
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

68.9 82.6 60.5 107.2
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = 0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 17 mph 64 30.27
Photo of Measurement Location
2034
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/16/2022 09:00:16
End Time: 11/16/2022 09:10:16
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.16
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/16/2022 07:54:55
Calibration Type: External reference
Sensitivity: 43.414019048214 mV/Pa
ESV_001
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 68.9 82.6 60.5
Time 09:00:16 AM 09:10:16 AM 0:10:00
Date 11/16/2022 11/16/2022
2035
Cursor: (A) Leq=68.9 dB LFmax=82.6 dB LFmin=60.5 dB
ESV_001

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/16/2022 09:00:16 AM - 09:10:16 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 0.8%
ESV_001
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/16/2022 09:00:16 AM - 09:10:16 AM dB
L1 = 77.6 dB
L5 = 74.4 dB
L10 = 72.4 dB
L50 = 65.4 dB
L90 = 62.5 dB
L95 = 62.1 dB
L99 = 61.6 dB
Level Cumulative
2036
Cursor: 11/16/2022 09:05:15 AM - 09:05:16 AM LAIeq=76.2 dB LAFmax=77.3 dB LCpeak=94.0 dB LAFmin=72.6 dB ESV_001
09:01:00 AM 09:03:00 AM 09:05:00 AM 09:07:00 AM 09:09:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
ESV_001
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 76.2 77.3 72.6
Time 09:05:15 AM 0:00:01
Date 11/16/2022
2037
Cursor: (A) Leq=75.9 dB
ESV_001

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/16/2022 09:05:15 AM - 09:05:16 AM
Hz
LZeq
Cursor: 11/16/2022 09:00:16 AM - 10:00:16 AM LAIeq=70.0 dB LAFmax=82.6 dB LCpeak=107.2 dB LAFmin=60.5 dB ESV_001 Periodic reports
09:10:00 AM 09:20:00 AM 09:30:00 AM 09:40:00 AM 09:50:00 AM 10:00:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2038
ESV_001 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 70.0 82.6 60.5
Time 09:00:16 AM 0:10:00
Date 11/16/2022
Cursor: (A) Leq=68.9 dB LFmax=82.6 dB LFmin=60.5 dB
ESV_001 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/16/2022 09:00:16 AM - 09:10:16 AM
Hz
LZeq LZFmax LZFmin
2039
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 0.8%
ESV_001 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/16/2022 09:00:16 AM - 09:10:16 AM dB
L1 = 77.6 dB
L5 = 74.4 dB
L10 = 72.4 dB
L50 = 65.4 dB
L90 = 62.5 dB
L95 = 62.1 dB
L99 = 61.6 dB
Level Cumulative
2040
Site Number: NM-2
Recorded By: Darshan Shivaiah and Tina Yuan
Job Number: 177949
Date: 11/16/22
Time: 9:23 a.m.

Location: Northeast Corner of Jamestown Avenue and 58th Street Source of Ambient Noise: Traffic noise along Jamestown Avenue and 58th Street and rustling leaves Source of Peak Noise: N/A
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

63.2 75.2 50.7 107.6
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = 0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 18 mph 66 30.27
Photo of Measurement Location
2041
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/16/2022 09:22:55
End Time: 11/16/2022 09:32:55
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.16
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/16/2022 07:54:55
Calibration Type: External reference
Sensitivity: 43.414019048214 mV/Pa
ESV_002
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 63.2 75.2 50.7
Time 09:22:55 AM 09:32:55 AM 0:10:00
Date 11/16/2022 11/16/2022
2042
Cursor: (A) Leq=63.2 dB LFmax=75.2 dB LFmin=50.7 dB
ESV_002

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/16/2022 09:22:55 AM - 09:32:55 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
ESV_002
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/16/2022 09:22:55 AM - 09:32:55 AM dB
L1 = 69.9 dB
L5 = 67.8 dB
L10 = 66.6 dB
L50 = 61.4 dB
L90 = 56.3 dB
L95 = 55.4 dB
L99 = 53.7 dB
Level Cumulative
2043
Cursor: 11/16/2022 09:27:54 AM - 09:27:55 AM LAIeq=59.4 dB LAFmax=59.6 dB LCpeak=82.1 dB LAFmin=58.7 dB ESV_002
09:23:00 AM 09:25:00 AM 09:27:00 AM 09:29:00 AM 09:31:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
ESV_002
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 59.4 59.6 58.7
Time 09:27:54 AM 0:00:01
Date 11/16/2022
2044
Cursor: (A) Leq=59.0 dB
ESV_002

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/16/2022 09:27:54 AM - 09:27:55 AM
Hz
LZeq
Cursor: 11/16/2022 09:22:55 AM - 10:22:55 AM LAIeq=64.4 dB LAFmax=75.2 dB LCpeak=107.6 dB LAFmin=50.7 dB ESV_002 Periodic reports
09:30:00 AM 09:40:00 AM 09:50:00 AM 10:00:00 AM 10:10:00 AM 10:20:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2045
ESV_002 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 64.4 75.2 50.7
Time 09:22:55 AM 0:10:00
Date 11/16/2022
Cursor: (A) Leq=63.2 dB LFmax=75.2 dB LFmin=50.7 dB
ESV_002 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/16/2022 09:22:55 AM - 09:32:55 AM
Hz
LZeq LZFmax LZFmin
2046
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
ESV_002 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/16/2022 09:22:55 AM - 09:32:55 AM dB
L1 = 69.9 dB
L5 = 67.8 dB
L10 = 66.6 dB
L50 = 61.4 dB
L90 = 56.3 dB
L95 = 55.4 dB
L99 = 53.7 dB
Level Cumulative
2047
Site Number: NM-3
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 9:41 a.m.

Location: Northwest Corner of Sendero Avenue and Limonite Avenue Source of Ambient Noise: Traffic noise along Limonite Avenue and Sendero Avenue and overhead plane noise Source of Peak Noise: Trucks passing by along Limonite Avenue Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

70.4 92.1 44.1 104.9
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2048
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 09:40:13
End Time: 11/17/2022 09:50:13
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_003
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 70.4 92.1 44.1
Time 09:40:13 AM 09:50:13 AM 0:10:00
Date 11/17/2022 11/17/2022
2049
Cursor: (A) Leq=70.4 dB LFmax=92.1 dB LFmin=44.1 dB
EAS_003

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 09:40:13 AM - 09:50:13 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 2.0%
EAS_003
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 09:40:13 AM - 09:50:13 AM dB
L1 = 79.7 dB
L5 = 75.4 dB
L10 = 73.6 dB
L50 = 65.5 dB
L90 = 53.8 dB
L95 = 51.3 dB
L99 = 47.9 dB
Level Cumulative
2050
Cursor: 11/17/2022 09:45:12 AM - 09:45:13 AM LAIeq=71.5 dB LAFmax=71.7 dB LCpeak=86.9 dB LAFmin=70.2 dB EAS_003
09:41:00 AM 09:43:00 AM 09:45:00 AM 09:47:00 AM 09:49:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_003
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 71.5 71.7 70.2
Time 09:45:12 AM 0:00:01
Date 11/17/2022
2051
Cursor: (A) Leq=70.9 dB
EAS_003

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 09:45:12 AM - 09:45:13 AM
Hz
LZeq
Cursor: 11/17/2022 09:40:13 AM - 10:40:13 AM LAIeq=72.9 dB LAFmax=92.1 dB LCpeak=104.9 dB LAFmin=44.1 dB EAS_003 Periodic reports
09:50:00 AM 10:00:00 AM 10:10:00 AM 10:20:00 AM 10:30:00 AM 10:40:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2052
EAS_003 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 72.9 92.1 44.1
Time 09:40:13 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=70.4 dB LFmax=92.1 dB LFmin=44.1 dB
EAS_003 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 09:40:13 AM - 09:50:13 AM
Hz
LZeq LZFmax LZFmin
2053
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 2.0%
EAS_003 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 09:40:13 AM - 09:50:13 AM dB
L1 = 79.7 dB
L5 = 75.4 dB
L10 = 73.6 dB
L50 = 65.5 dB
L90 = 53.8 dB
L95 = 51.3 dB
L99 = 47.9 dB
Level Cumulative
2054
Site Number: NM-4
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 10:00 a.m.

Location: Northwest Corner of Sendero Avenue and Limonite Avenue Source of Ambient Noise: Traffic noise along Limonite Avenue and Sumner Avenue Source of Peak Noise: Trucks passing by along Limonite Avenue, air plane flew overhead Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

69.7 81.5 54.2 101.0
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2055
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 10:00:17
End Time: 11/17/2022 10:10:17
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_004
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 69.7 81.5 54.2
Time 10:00:17 AM 10:10:17 AM 0:10:00
Date 11/17/2022 11/17/2022
2056
Cursor: (A) Leq=69.7 dB LFmax=81.5 dB LFmin=54.2 dB
EAS_004

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 10:00:17 AM - 10:10:17 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.2% Cumulative: 1.3%
EAS_004
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 10:00:17 AM - 10:10:17 AM dB
L1 = 78.6 dB
L5 = 75.9 dB
L10 = 74.3 dB
L50 = 64.7 dB
L90 = 58.6 dB
L95 = 57.6 dB
L99 = 55.2 dB
Level Cumulative
2057
Cursor: 11/17/2022 10:05:16 AM - 10:05:17 AM LAIeq=64.2 dB LAFmax=65.0 dB LCpeak=85.4 dB LAFmin=62.4 dB EAS_004
10:01:00 AM 10:03:00 AM 10:05:00 AM 10:07:00 AM 10:09:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_004
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 64.2 65.0 62.4
Time 10:05:16 AM 0:00:01
Date 11/17/2022
2058
Cursor: (A) Leq=63.6 dB
EAS_004

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 10:05:16 AM - 10:05:17 AM
Hz
LZeq
Cursor: 11/17/2022 10:00:17 AM - 11:00:17 AM LAIeq=70.9 dB LAFmax=81.5 dB LCpeak=101.0 dB LAFmin=54.2 dB EAS_004 Periodic reports
10:10:00 AM 10:20:00 AM 10:30:00 AM 10:40:00 AM 10:50:00 AM 11:00:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2059
EAS_004 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 70.9 81.5 54.2
Time 10:00:17 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=69.7 dB LFmax=81.5 dB LFmin=54.2 dB
EAS_004 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 10:00:17 AM - 10:10:17 AM
Hz
LZeq LZFmax LZFmin
2060
Cursor: [78.2 ; 78.4[ dB Level: 0.2% Cumulative: 1.3%
EAS_004 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 10:00:17 AM - 10:10:17 AM dB
L1 = 78.6 dB
L5 = 75.9 dB
L10 = 74.3 dB
L50 = 64.7 dB
L90 = 58.6 dB
L95 = 57.6 dB
L99 = 55.2 dB
Level Cumulative
2061
Site Number: NM-5
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 10:19 a.m.

Location: Northeast Corner of Hamner Avenue and Walgreens Driveway Source of Ambient Noise: Traffic noise along Limonite Avenue and Hamner Avenue Source of Peak Noise: Overhead Plane Noise
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

64.3 85.1 43.7 109.6
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2062
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 10:19:12
End Time: 11/17/2022 10:29:12
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_005
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 64.3 85.1 43.7
Time 10:19:12 AM 10:29:12 AM 0:10:00
Date 11/17/2022 11/17/2022
2063
Cursor: (A) Leq=64.3 dB LFmax=85.1 dB LFmin=43.7 dB
EAS_005

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 10:19:12 AM - 10:29:12 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.1%
EAS_005
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 10:19:12 AM - 10:29:12 AM dB
L1 = 72.4 dB
L5 = 69.0 dB
L10 = 67.5 dB
L50 = 61.9 dB
L90 = 57.2 dB
L95 = 55.4 dB
L99 = 53.4 dB
Level Cumulative
2064
Cursor: 11/17/2022 10:24:11 AM - 10:24:12 AM LAIeq=60.5 dB LAFmax=61.6 dB LCpeak=81.6 dB LAFmin=58.4 dB EAS_005
10:20:00 AM 10:22:00 AM 10:24:00 AM 10:26:00 AM 10:28:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_005
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 60.5 61.6 58.4
Time 10:24:11 AM 0:00:01
Date 11/17/2022
2065
Cursor: (A) Leq=60.2 dB
EAS_005

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 10:24:11 AM - 10:24:12 AM
Hz
LZeq
Cursor: 11/17/2022 10:19:12 AM - 11:19:12 AM LAIeq=67.3 dB LAFmax=85.1 dB LCpeak=109.6 dB LAFmin=43.7 dB EAS_005 Periodic reports
10:20:00 AM 10:30:00 AM 10:40:00 AM 10:50:00 AM 11:00:00 AM 11:10:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2066
EAS_005 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 67.3 85.1 43.7
Time 10:19:12 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=64.3 dB LFmax=85.1 dB LFmin=43.7 dB
EAS_005 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 10:19:12 AM - 10:29:12 AM
Hz
LZeq LZFmax LZFmin
2067
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.1%
EAS_005 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 10:19:12 AM - 10:29:12 AM dB
L1 = 72.4 dB
L5 = 69.0 dB
L10 = 67.5 dB
L50 = 61.9 dB
L90 = 57.2 dB
L95 = 55.4 dB
L99 = 53.4 dB
Level Cumulative
2068
Site Number: NM-6
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 10:42 a.m.

Location: On the Sidewalk in front of 6702 Ground Ivy Court residence.

Source of Ambient Noise: Traffic noise along Hellman Avenue and Overhead Plane Noise.

Source of Peak Noise: Landscaping Equipment and Overhead Plane Noise Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

47.9 78.3 22.2 109.0
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2069
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 10:41:48
End Time: 11/17/2022 10:51:48
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_006
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 47.9 78.3 22.2
Time 10:41:48 AM 10:51:48 AM 0:10:00
Date 11/17/2022 11/17/2022
2070
Cursor: (A) Leq=47.9 dB LFmax=78.3 dB LFmin=22.2 dB
EAS_006

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 10:41:48 AM - 10:51:48 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
EAS_006
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 10:41:48 AM - 10:51:48 AM dB
L1 = 54.8 dB
L5 = 52.0 dB
L10 = 50.1 dB
L50 = 37.5 dB
L90 = 26.9 dB
L95 = 25.2 dB
L99 = 23.5 dB
Level Cumulative
2071
Cursor: 11/17/2022 10:46:47 AM - 10:46:48 AM LAIeq=28.0 dB LAFmax=27.8 dB LCpeak=48.5 dB LAFmin=26.1 dB EAS_006
10:42:00 AM 10:44:00 AM 10:46:00 AM 10:48:00 AM 10:50:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_006
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 28.0 27.8 26.1
Time 10:46:47 AM 0:00:01
Date 11/17/2022
2072
Cursor: (A) Leq=26.7 dB
EAS_006

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 10:46:47 AM - 10:46:48 AM
Hz
LZeq
Cursor: 11/17/2022 10:41:48 AM - 11:41:48 AM LAIeq=58.3 dB LAFmax=78.3 dB LCpeak=109.0 dB LAFmin=22.2 dB EAS_006 Periodic reports
10:50:00 AM 11:00:00 AM 11:10:00 AM 11:20:00 AM 11:30:00 AM 11:40:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2073
EAS_006 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 58.3 78.3 22.2
Time 10:41:48 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=47.9 dB LFmax=78.3 dB LFmin=22.2 dB
EAS_006 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 10:41:48 AM - 10:51:48 AM
Hz
LZeq LZFmax LZFmin
2074
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
EAS_006 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 10:41:48 AM - 10:51:48 AM dB
L1 = 54.8 dB
L5 = 52.0 dB
L10 = 50.1 dB
L50 = 37.5 dB
L90 = 26.9 dB
L95 = 25.2 dB
L99 = 23.5 dB
Level Cumulative
2075
Site Number: NM-7
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 11:01 a.m.

Location: Northwest corner of Archibald Avenue and Schleisman Road Source of Ambient Noise: Traffic noise along Archibald Avenue and Schleisman Road.

Source of Peak Noise: Passing by Trucks and Overhead Plane Noise Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

72.6 90.0 54.1 108.3
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2076
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 11:00:33
End Time: 11/17/2022 11:10:33
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_007
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 72.6 90.0 54.1
Time 11:00:33 AM 11:10:33 AM 0:10:00
Date 11/17/2022 11/17/2022
2077
Cursor: (A) Leq=72.6 dB LFmax=90.0 dB LFmin=54.1 dB
EAS_007

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 11:00:33 AM - 11:10:33 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.2% Cumulative: 4.3%
EAS_007
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 11:00:33 AM - 11:10:33 AM dB
L1 = 84.1 dB
L5 = 77.5 dB
L10 = 74.9 dB
L50 = 69.0 dB
L90 = 62.5 dB
L95 = 60.3 dB
L99 = 57.2 dB
Level Cumulative
2078
Cursor: 11/17/2022 11:05:32 AM - 11:05:33 AM LAIeq=69.2 dB LAFmax=70.7 dB LCpeak=89.2 dB LAFmin=67.0 dB EAS_007
11:01:00 AM 11:03:00 AM 11:05:00 AM 11:07:00 AM 11:09:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_007
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 69.2 70.7 67.0
Time 11:05:32 AM 0:00:01
Date 11/17/2022
2079
Cursor: (A) Leq=69.1 dB
EAS_007

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 11:05:32 AM - 11:05:33 AM
Hz
LZeq
Cursor: 11/17/2022 11:00:33 AM - 12:00:33 PM LAIeq=74.7 dB LAFmax=90.0 dB LCpeak=108.3 dB LAFmin=54.1 dB EAS_007 Periodic reports
11:10:00 AM 11:20:00 AM 11:30:00 AM 11:40:00 AM 11:50:00 AM 12:00:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2080
EAS_007 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 74.7 90.0 54.1
Time 11:00:33 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=72.6 dB LFmax=90.0 dB LFmin=54.1 dB
EAS_007 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 11:00:33 AM - 11:10:33 AM
Hz
LZeq LZFmax LZFmin
2081
Cursor: [78.2 ; 78.4[ dB Level: 0.2% Cumulative: 4.3%
EAS_007 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 11:00:33 AM - 11:10:33 AM dB
L1 = 84.1 dB
L5 = 77.5 dB
L10 = 74.9 dB
L50 = 69.0 dB
L90 = 62.5 dB
L95 = 60.3 dB
L99 = 57.2 dB
Level Cumulative
2082
Site Number: NM-8
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 11:24 a.m.

Location: Northwest corner of Sumner Avenue and Schleisman Road Source of Ambient Noise: Traffic noise along Sumner Avenue and Schleisman Road.

Source of Peak Noise: Passing by Trucks
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

65.6 80.3 49.9 103.6
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2083
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 11:24:18
End Time: 11/17/2022 11:34:18
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_008
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 65.6 80.3 49.9
Time 11:24:18 AM 11:34:18 AM 0:10:00
Date 11/17/2022 11/17/2022
2084
Cursor: (A) Leq=65.6 dB LFmax=80.3 dB LFmin=49.9 dB
EAS_008

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 11:24:18 AM - 11:34:18 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.3%
EAS_008
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 11:24:18 AM - 11:34:18 AM dB
L1 = 76.4 dB
L5 = 71.8 dB
L10 = 68.9 dB
L50 = 60.7 dB
L90 = 53.8 dB
L95 = 52.9 dB
L99 = 51.2 dB
Level Cumulative
2085
Cursor: 11/17/2022 11:29:17 AM - 11:29:18 AM LAIeq=68.6 dB LAFmax=68.6 dB LCpeak=87.8 dB LAFmin=65.8 dB EAS_008
11:25:00 AM 11:27:00 AM 11:29:00 AM 11:31:00 AM 11:33:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_008
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 68.6 68.6 65.8
Time 11:29:17 AM 0:00:01
Date 11/17/2022
2086
Cursor: (A) Leq=67.5 dB
EAS_008

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 11:29:17 AM - 11:29:18 AM
Hz
LZeq
Cursor: 11/17/2022 11:24:18 AM - 12:24:18 PM LAIeq=67.3 dB LAFmax=80.3 dB LCpeak=103.6 dB LAFmin=49.9 dB EAS_008 Periodic reports
11:30:00 AM 11:40:00 AM 11:50:00 AM 12:00:00 PM 12:10:00 PM 12:20:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2087
EAS_008 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 67.3 80.3 49.9
Time 11:24:18 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=65.6 dB LFmax=80.3 dB LFmin=49.9 dB
EAS_008 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 11:24:18 AM - 11:34:18 AM
Hz
LZeq LZFmax LZFmin
2088
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.3%
EAS_008 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 11:24:18 AM - 11:34:18 AM dB
L1 = 76.4 dB
L5 = 71.8 dB
L10 = 68.9 dB
L50 = 60.7 dB
L90 = 53.8 dB
L95 = 52.9 dB
L99 = 51.2 dB
Level Cumulative
2089
Site Number: NM-9
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 11:45 a.m.

Location: Northwest corner of Sumner Avenue and Schleisman Road Source of Ambient Noise: Traffic noise along Hamner Avenue and Mississippi Drive Source of Peak Noise: Passing by Trucks
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

66.6 79.6 42.2 99.6
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2090
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 11:44:30
End Time: 11/17/2022 11:54:30
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_009
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 66.6 79.6 42.2
Time 11:44:30 AM 11:54:30 AM 0:10:00
Date 11/17/2022 11/17/2022
2091
Cursor: (A) Leq=66.6 dB LFmax=79.6 dB LFmin=42.2 dB
EAS_009

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 11:44:30 AM - 11:54:30 AM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.1%
EAS_009
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 11:44:30 AM - 11:54:30 AM dB
L1 = 75.0 dB
L5 = 72.6 dB
L10 = 71.1 dB
L50 = 62.5 dB
L90 = 49.1 dB
L95 = 46.7 dB
L99 = 44.3 dB
Level Cumulative
2092
Cursor: 11/17/2022 11:49:29 AM - 11:49:30 AM LAIeq=51.3 dB LAFmax=50.6 dB LCpeak=75.0 dB LAFmin=48.8 dB EAS_009
11:45:00 AM 11:47:00 AM 11:49:00 AM 11:51:00 AM 11:53:00 AM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_009
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 51.3 50.6 48.8
Time 11:49:29 AM 0:00:01
Date 11/17/2022
2093
Cursor: (A) Leq=49.6 dB
EAS_009

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 11:49:29 AM - 11:49:30 AM
Hz
LZeq
Cursor: 11/17/2022 11:44:30 AM - 12:44:30 PM LAIeq=67.9 dB LAFmax=79.6 dB LCpeak=99.6 dB LAFmin=42.2 dB EAS_009 Periodic reports
11:50:00 AM 12:00:00 PM 12:10:00 PM 12:20:00 PM 12:30:00 PM 12:40:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2094
EAS_009 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 67.9 79.6 42.2
Time 11:44:30 AM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=66.6 dB LFmax=79.6 dB LFmin=42.2 dB
EAS_009 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 11:44:30 AM - 11:54:30 AM
Hz
LZeq LZFmax LZFmin
2095
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.1%
EAS_009 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 11:44:30 AM - 11:54:30 AM dB
L1 = 75.0 dB
L5 = 72.6 dB
L10 = 71.1 dB
L50 = 62.5 dB
L90 = 49.1 dB
L95 = 46.7 dB
L99 = 44.3 dB
Level Cumulative
2096
Site Number: NM-10
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 12:06 p.m.

Location: Southeast corner of Harrison Avenue and Citrus Street Source of Ambient Noise: Traffic noise along Harrison Avenue and Citrus Street Source of Peak Noise: Cargo Truck Stopping by
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

65.4 88.5 44.0 100.1
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2097
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 12:06:23
End Time: 11/17/2022 12:16:23
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_010
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 65.4 88.5 44.0
Time 12:06:23 PM 12:16:23 PM 0:10:00
Date 11/17/2022 11/17/2022
2098
Cursor: (A) Leq=65.4 dB LFmax=88.5 dB LFmin=44.0 dB
EAS_010

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 12:06:23 PM - 12:16:23 PM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.7%
EAS_010
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 12:06:23 PM - 12:16:23 PM dB
L1 = 75.2 dB
L5 = 68.8 dB
L10 = 66.7 dB
L50 = 59.1 dB
L90 = 52.8 dB
L95 = 51.0 dB
L99 = 46.6 dB
Level Cumulative
2099
Cursor: 11/17/2022 12:11:22 PM - 12:11:23 PM LAIeq=65.8 dB LAFmax=66.3 dB LCpeak=81.5 dB LAFmin=62.4 dB EAS_010
12:07:00 PM 12:09:00 PM 12:11:00 PM 12:13:00 PM 12:15:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_010
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 65.8 66.3 62.4
Time 12:11:22 PM 0:00:01
Date 11/17/2022
2100
Cursor: (A) Leq=63.4 dB
EAS_010

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 12:11:22 PM - 12:11:23 PM
Hz
LZeq
Cursor: 11/17/2022 12:06:23 PM - 01:06:23 PM LAIeq=69.0 dB LAFmax=88.5 dB LCpeak=100.1 dB LAFmin=44.0 dB EAS_010 Periodic reports
12:10:00 PM 12:20:00 PM 12:30:00 PM 12:40:00 PM 12:50:00 PM 01:00:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2101
EAS_010 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 69.0 88.5 44.0
Time 12:06:23 PM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=65.4 dB LFmax=88.5 dB LFmin=44.0 dB
EAS_010 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 12:06:23 PM - 12:16:23 PM
Hz
LZeq LZFmax LZFmin
2102
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.7%
EAS_010 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 12:06:23 PM - 12:16:23 PM dB
L1 = 75.2 dB
L5 = 68.8 dB
L10 = 66.7 dB
L50 = 59.1 dB
L90 = 52.8 dB
L95 = 51.0 dB
L99 = 46.6 dB
Level Cumulative
2103
Site Number: NM-11
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 12:25 p.m.

Location: Along the sidewalk in front of 13108 Bertz Way Source of Ambient Noise: Traffic noise along Bertz Way
Source of Peak Noise: N/A
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

46.2 62.2 37.4 87.5
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2104
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 12:25:15
End Time: 11/17/2022 12:35:15
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_011
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 46.2 62.2 37.4
Time 12:25:15 PM 12:35:15 PM 0:10:00
Date 11/17/2022 11/17/2022
2105
Cursor: (A) Leq=46.2 dB LFmax=62.2 dB LFmin=37.4 dB
EAS_011

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 12:25:15 PM - 12:35:15 PM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
EAS_011
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 12:25:15 PM - 12:35:15 PM dB
L1 = 56.3 dB
L5 = 51.4 dB
L10 = 49.1 dB
L50 = 42.3 dB
L90 = 39.6 dB
L95 = 39.1 dB
L99 = 38.5 dB
Level Cumulative
2106
Cursor: 11/17/2022 12:30:14 PM - 12:30:15 PM LAIeq=44.7 dB LAFmax=44.7 dB LCpeak=69.7 dB LAFmin=43.4 dB EAS_011
12:26:00 PM 12:28:00 PM 12:30:00 PM 12:32:00 PM 12:34:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_011
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 44.7 44.7 43.4
Time 12:30:14 PM 0:00:01
Date 11/17/2022
2107
Cursor: (A) Leq=44.1 dB
EAS_011

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 12:30:14 PM - 12:30:15 PM
Hz
LZeq
Cursor: 11/17/2022 12:25:15 PM - 01:25:15 PM LAIeq=48.1 dB LAFmax=62.2 dB LCpeak=87.5 dB LAFmin=37.4 dB EAS_011 Periodic reports
12:30:00 PM 12:40:00 PM 12:50:00 PM 01:00:00 PM 01:10:00 PM 01:20:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2108
EAS_011 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 48.1 62.2 37.4
Time 12:25:15 PM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=46.2 dB LFmax=62.2 dB LFmin=37.4 dB
EAS_011 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 12:25:15 PM - 12:35:15 PM
Hz
LZeq LZFmax LZFmin
2109
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
EAS_011 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 12:25:15 PM - 12:35:15 PM dB
L1 = 56.3 dB
L5 = 51.4 dB
L10 = 49.1 dB
L50 = 42.3 dB
L90 = 39.6 dB
L95 = 39.1 dB
L99 = 38.5 dB
Level Cumulative
2110
Site Number: NM-12
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 12:46 p.m.

Location: Southeast Corner of Selby Avenue and Redwood Valley Road Source of Ambient Noise: Traffic noise along Selby Avenue and Redwood Valley Road Source of Peak Noise: N/A
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

57.8 80.6 36.5 99.8
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2111
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 12:45:54
End Time: 11/17/2022 12:55:54
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_012
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 57.8 80.6 36.5
Time 12:45:54 PM 12:55:54 PM 0:10:00
Date 11/17/2022 11/17/2022
2112
Cursor: (A) Leq=57.8 dB LFmax=80.6 dB LFmin=36.5 dB
EAS_012

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 12:45:54 PM - 12:55:54 PM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.1%
EAS_012
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 12:45:54 PM - 12:55:54 PM dB
L1 = 70.8 dB
L5 = 62.7 dB
L10 = 58.3 dB
L50 = 43.3 dB
L90 = 39.1 dB
L95 = 38.2 dB
L99 = 37.5 dB
Level Cumulative
2113
Cursor: 11/17/2022 12:50:53 PM - 12:50:54 PM LAIeq=41.1 dB LAFmax=41.1 dB LCpeak=69.8 dB LAFmin=40.0 dB EAS_012
12:46:00 PM 12:48:00 PM 12:50:00 PM 12:52:00 PM 12:54:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_012
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 41.1 41.1 40.0
Time 12:50:53 PM 0:00:01
Date 11/17/2022
2114
Cursor: (A) Leq=40.5 dB
EAS_012

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 12:50:53 PM - 12:50:54 PM
Hz
LZeq
Cursor: 11/17/2022 12:45:54 PM - 01:45:54 PM LAIeq=63.2 dB LAFmax=80.6 dB LCpeak=99.8 dB LAFmin=36.5 dB EAS_012 Periodic reports
12:50:00 PM 01:00:00 PM 01:10:00 PM 01:20:00 PM 01:30:00 PM 01:40:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2115
EAS_012 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 63.2 80.6 36.5
Time 12:45:54 PM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=57.8 dB LFmax=80.6 dB LFmin=36.5 dB
EAS_012 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 12:45:54 PM - 12:55:54 PM
Hz
LZeq LZFmax LZFmin
2116
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.1%
EAS_012 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 12:45:54 PM - 12:55:54 PM dB
L1 = 70.8 dB
L5 = 62.7 dB
L10 = 58.3 dB
L50 = 43.3 dB
L90 = 39.1 dB
L95 = 38.2 dB
L99 = 37.5 dB
Level Cumulative
2117
Site Number: NM-13
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 1:05 p.m.

Location: Along the sidewalk, in front of 8297 Fall Creek Drive residence Source of Ambient Noise: Construction noise and landscaping equipment Source of Peak Noise: Construction noise at approximately 550 feet away and landscaping equipment Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

52.0 66.9 36.2 84.5
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2118
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 13:05:25
End Time: 11/17/2022 13:15:25
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_013
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 52.0 66.9 36.2
Time 01:05:25 PM 01:15:25 PM 0:10:00
Date 11/17/2022 11/17/2022
2119
Cursor: (A) Leq=52.0 dB LFmax=66.9 dB LFmin=36.2 dB
EAS_013

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 01:05:25 PM - 01:15:25 PM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
EAS_013
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 01:05:25 PM - 01:15:25 PM dB
L1 = 58.5 dB
L5 = 57.0 dB
L10 = 55.8 dB
L50 = 49.8 dB
L90 = 39.1 dB
L95 = 38.1 dB
L99 = 37.2 dB
Level Cumulative
2120
Cursor: 11/17/2022 01:10:24 PM - 01:10:25 PM LAIeq=53.1 dB LAFmax=53.4 dB LCpeak=72.6 dB LAFmin=50.4 dB EAS_013
01:06:00 PM 01:08:00 PM 01:10:00 PM 01:12:00 PM 01:14:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_013
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 53.1 53.4 50.4
Time 01:10:24 PM 0:00:01
Date 11/17/2022
2121
Cursor: (A) Leq=51.8 dB
EAS_013

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 01:10:24 PM - 01:10:25 PM
Hz
LZeq
Cursor: 11/17/2022 01:05:25 PM - 02:05:25 PM LAIeq=53.6 dB LAFmax=66.9 dB LCpeak=84.5 dB LAFmin=36.2 dB EAS_013 Periodic reports
01:10:00 PM 01:20:00 PM 01:30:00 PM 01:40:00 PM 01:50:00 PM 02:00:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2122
EAS_013 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 53.6 66.9 36.2
Time 01:05:25 PM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=52.0 dB LFmax=66.9 dB LFmin=36.2 dB
EAS_013 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 01:05:25 PM - 01:15:25 PM
Hz
LZeq LZFmax LZFmin
2123
Cursor: [78.2 ; 78.4[ dB Level: 0.0% Cumulative: 0.0%
EAS_013 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 01:05:25 PM - 01:15:25 PM dB
L1 = 58.5 dB
L5 = 57.0 dB
L10 = 55.8 dB
L50 = 49.8 dB
L90 = 39.1 dB
L95 = 38.1 dB
L99 = 37.2 dB
Level Cumulative
2124
Site Number: NM-14
Recorded By: Darshan Shivaiah, Tina Yuan
Job Number: 177949
Date: 11/17/22
Time: 1:25 p.m.

Location: Northwest corner of Archibald Avenue and River Road Source of Ambient Noise: Traffic Noise along Archibald Avenue and River Road Source of Peak Noise: Overhead Plane noise
Noise Data
Leq (dB) Lmax(dB) Lmin (dB) Peak (dB)

67.1 80.1 41.4 97.6
Equipment
Category Type Vendor Model Serial No. Cert. Date Note
Sound
Sound Level Meter Brüel & Kjær 2250 3011133 03/10/2022
Microphone Brüel & Kjær 4189 3086765 03/10/2022
Preamp Brüel & Kjær ZC 0032 25380 03/10/2022
Calibrator Brüel & Kjær 4231 2545667 03/10/2022
Weather Data
Est.

Duration: 10 minutes Sky: Clear
Note: dBA Offset = -0.01 Sensor Height (ft): 5 ft
Wind Ave Speed (mph / m/s) Temperature (degrees Fahrenheit) Barometer Pressure (inches) 3 mph 66.0 30.22
Photo of Measurement Location
2125
2250
Instrument: 2250
Application: BZ7225 Version 4.7.6
Start Time: 11/17/2022 13:25:12
End Time: 11/17/2022 13:35:12
Elapsed Time: 00:10:00
Bandwidth: 1/3-octave
Max Input Level: 142.17
Time Frequency
Broadband (excl. Peak): FSI AC
Broadband Peak: C
Spectrum: FS Z
Instrument Serial Number: 3011133
Microphone Serial Number: 3086765
Input: Top Socket
Windscreen Correction: UA-1650
Sound Field Correction: Free-field
Calibration Time: 11/17/2022 07:54:04
Calibration Type: External reference
Sensitivity: 43.3690585196018 mV/Pa
EAS_014
Start End Elapsed Overload LAeq LAFmax LAFmin
time time time [%] [dB] [dB] [dB]
Value 0.00 67.1 80.1 41.4
Time 01:25:12 PM 01:35:12 PM 0:10:00
Date 11/17/2022 11/17/2022
2126
Cursor: (A) Leq=67.1 dB LFmax=80.1 dB LFmin=41.4 dB
EAS_014

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 10 20
30 40
50 60
70 80
90 100
110
120
130
dB 11/17/2022 01:25:12 PM - 01:35:12 PM
Hz
LZeq LZFmax LZFmin
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 0.2%
EAS_014
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 01:25:12 PM - 01:35:12 PM dB
L1 = 76.1 dB
L5 = 73.3 dB
L10 = 71.3 dB
L50 = 63.1 dB
L90 = 56.6 dB
L95 = 54.4 dB
L99 = 43.6 dB
Level Cumulative
2127
Cursor: 11/17/2022 01:30:11 PM - 01:30:12 PM LAIeq=67.2 dB LAFmax=67.6 dB LCpeak=85.7 dB LAFmin=65.9 dB EAS_014
01:26:00 PM 01:28:00 PM 01:30:00 PM 01:32:00 PM 01:34:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
EAS_014
Start Elapsed LAIeq LAFmax LAFmin
time time [dB] [dB] [dB]
Value 67.2 67.6 65.9
Time 01:30:11 PM 0:00:01
Date 11/17/2022
2128
Cursor: (A) Leq=66.3 dB
EAS_014

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 01:30:11 PM - 01:30:12 PM
Hz
LZeq
Cursor: 11/17/2022 01:25:12 PM - 02:25:12 PM LAIeq=68.2 dB LAFmax=80.1 dB LCpeak=97.6 dB LAFmin=41.4 dB EAS_014 Periodic reports
01:30:00 PM 01:40:00 PM 01:50:00 PM 02:00:00 PM 02:10:00 PM 02:20:00 PM 20 40
60 80
100
120
140
Sound
dB
LAIeq LAFmax LCpeak LAFmin
2129
EAS_014 Periodic reports
Start Elapsed Overload LAIeq LAFmax LAFmin
time time [%] [dB] [dB] [dB]
Value 0.00 68.2 80.1 41.4
Time 01:25:12 PM 0:10:00
Date 11/17/2022
Cursor: (A) Leq=67.1 dB LFmax=80.1 dB LFmin=41.4 dB
EAS_014 Periodic reports

12.50 31.50 63 125 250 500 1000 2000 4000 8000 16000 A C 0 20
40 60
80 100
120
140
dB 11/17/2022 01:25:12 PM - 01:35:12 PM
Hz
LZeq LZFmax LZFmin
2130
Cursor: [78.2 ; 78.4[ dB Level: 0.1% Cumulative: 0.2%
EAS_014 Periodic reports
20 30 40 50 60 70 80 90 100 110 120 130 140
0 10
20 30
40 50
60 70
80 90
100
% Based on LAF , 10ms Class width: 0.2 dB 11/17/2022 01:25:12 PM - 01:35:12 PM dB
L1 = 76.1 dB
L5 = 73.3 dB
L10 = 71.3 dB
L50 = 63.1 dB
L90 = 56.6 dB
L95 = 54.4 dB
L99 = 43.6 dB
Level Cumulative
2131

TRAFFIC NOISE LEVELS AND NOISE CONTOURS
Project Number: 177949
Project Name: Eastvale General Plan Update
Scenario: Existing
Background Information
Model Description: FHWA Highway Noise Prediction Model (FHWA-RD-77-108) with California Vehicle Noise (CALVENO) Emission Levels.

Source of Traffic Volumes: Michael Baker International
Community Noise Descriptor: Ldn: CNEL: X
Assumed 24-Hour Traffic Distribution: Day Evening Night Total ADT Volumes 77.50% 12.90% 9.60%
Medium-Duty Trucks 84.80% 4.90% 10.30%
Heavy-Duty Trucks 86.50% 2.70% 10.80%
Design Vehicle Mix Distance from Centerline of Roadway
Analysis Condition Median ADT Speed Alpha Medium Heavy CNEL at Distance to Contour Roadway, Segment Lanes Width Volume (mph) Factor Trucks Trucks 100 Feet 70 CNEL 65 CNEL 60 CNEL 55 CNEL Limonite Avenue between Archibald Avenue and I-15 Freeway 6 5 49,500 50 0.5 1.8% 0.7% 69.8 97 208 448 966 65th Street between Coyote Trail Lane and Hammer Avenue 4 0 10,900 40 0.5 1.8% 0.7% 60.6 - 51 110 238 68th Street between Hammer Avenue and I-15 Freeway 4 10 26,700 45 0.5 1.8% 0.7% 65.8 52 113 244 525 Schleisman Road between Hellman Avenue and Hammer Avenue 6 0 40,000 45 0.5 1.8% 0.7% 67.7 70 151 325 701 Citrus Street between Harrison Avenue and Hammer Avenue 4 0 13,200 45 0.5 1.8% 0.7% 62.7 - 70 151 325 Chandler Street between Hellman Avenue and Harrison Avenue 4 20 7,000 45 0.5 1.8% 0.7% 60.1 - - 101 218 River Road between Hellman Avenue and Archibald Avenue 4 10 16,966 45 0.5 1.8% 0.7% 63.8 - 84 180 388 River Road between Archibald Avenue and Southern City Limits 4 10 40,255 55 0.5 1.8% 0.7% 69.7 96 206 444 957 Milliken Avenue between Philadelphia Street and SR-60 EB Ramps 6 15 21,300 50 0.5 1.8% 0.7% 66.2 - 121 261 562 Hammer Avenue between SR-60 EB Ramps and Southern City Limits 4 10 32,600 50 0.5 1.8% 0.7% 67.8 71 153 330 710 Scholar Way between Bellegrave Avenue and Schleisman Road 2 0 7,300 35 0.5 1.8% 0.7% 57.5 - - 68 147 Scholar Way between Schleisman Road and Citrus Street 4 10 7,300 35 0.5 1.8% 0.7% 57.7 - - 70 150 Summer Avenue between Bellegrave Avenue and Citrus Street 4 10 11,100 45 0.5 1.8% 0.7% 62.0 - 63 136 292 Harrison Avenue between Limonite Avenue and Chandler Street 4 10 9,700 45 0.5 1.8% 0.7% 61.4 - 58 124 267 Archibald Avenue between Limonite Avenue and River Road 6 15 30,700 50 0.5 1.8% 0.7% 67.8 72 154 333 717 Hellman Avenue between Northern Terminus and River Road 4 0 21,917 50 0.5 1.8% 0.7% 66.0 54 116 250 539 Bellegrave Avenue between Summer Avenue and I-15 Freeway 2 0 7,300 50 0.5 1.8% 0.7% 61.1 - 55 119 255 Cantu Galleano Ranch Road between Milliken Avenue and I-15 Freeway 6 0 12,200 55 0.5 1.8% 0.7% 64.7 - 95 204 440 Riverside Drive between Hammer Avenue and I-15 Freeway 2 10 6,500 45 0.5 1.8% 0.7% 59.5 - 43 93 200 "-" = contour is located within the roadway right-of-way.

Michael Baker International Page 1
2132

TRAFFIC NOISE LEVELS AND NOISE CONTOURS
Project Number: 177949
Project Name: Eastvale General Plan Update
Scenario: General Plan
Background Information
Model Description: FHWA Highway Noise Prediction Model (FHWA-RD-77-108) with California Vehicle Noise (CALVENO) Emission Levels.

Source of Traffic Volumes: Michael Baker International
Community Noise Descriptor: Ldn: CNEL: X
Assumed 24-Hour Traffic Distribution: Day Evening Night Total ADT Volumes 77.50% 12.90% 9.60%
Medium-Duty Trucks 84.80% 4.90% 10.30%
Heavy-Duty Trucks 86.50% 2.70% 10.80%
Design Vehicle Mix Distance from Centerline of Roadway
Analysis Condition Median ADT Speed Alpha Medium Heavy CNEL at Distance to Contour Roadway, Segment Lanes Width Volume (mph) Factor Trucks Trucks 100 Feet 70 CNEL 65 CNEL 60 CNEL 55 CNEL Limonite Avenue between Archibald Avenue and I-15 Freeway 6 5 80,320 50 0.5 1.8% 0.7% 71.9 133 287 619 1,334 65th Street between Coyote Trail Lane and Hammer Avenue 4 0 30,202 40 0.5 1.8% 0.7% 65.1 47 101 218 469 68th Street between Hammer Avenue and I-15 Freeway 4 10 13,825 45 0.5 1.8% 0.7% 62.9 - 73 157 338 Schleisman Road between Hellman Avenue and Hammer Avenue 6 0 43,332 45 0.5 1.8% 0.7% 68.0 74 159 343 740 Citrus Street between Harrison Avenue and Hammer Avenue 4 0 17,504 45 0.5 1.8% 0.7% 63.9 - 84 182 392 Chandler Street between Hellman Avenue and Harrison Avenue 4 20 12,530 45 0.5 1.8% 0.7% 62.6 - 69 149 321 River Road between Hellman Avenue and Archibald Avenue 4 10 19,014 45 0.5 1.8% 0.7% 64.3 - 90 194 419 River Road between Archibald Avenue and Southern City Limits 4 10 38,014 55 0.5 1.8% 0.7% 69.5 92 198 427 921 Milliken Avenue between Philadelphia Street and SR-60 EB Ramps 6 15 21,890 50 0.5 1.8% 0.7% 66.4 - 123 265 572 Hammer Avenue between SR-60 EB Ramps and Southern City Limits 4 10 35,582 50 0.5 1.8% 0.7% 68.2 75 162 350 753 Scholar Way between Bellegrave Avenue and Schleisman Road 2 0 8,234 35 0.5 1.8% 0.7% 58.0 - 34 74 159 Scholar Way between Schleisman Road and Citrus Street 4 10 11,364 35 0.5 1.8% 0.7% 59.6 - - 94 202 Summer Avenue between Bellegrave Avenue and Citrus Street 4 10 12,330 45 0.5 1.8% 0.7% 62.4 - 68 146 314 Harrison Avenue between Limonite Avenue and Chandler Street 4 10 13,617 45 0.5 1.8% 0.7% 62.9 - 72 156 335 Archibald Avenue between Limonite Avenue and River Road 6 15 30,025 50 0.5 1.8% 0.7% 67.7 71 152 328 706 Hellman Avenue between Northern Terminus and River Road 4 0 29,945 50 0.5 1.8% 0.7% 67.3 66 143 308 664 Bellegrave Avenue between Summer Avenue and I-15 Freeway 2 0 10,824 50 0.5 1.8% 0.7% 62.8 33 72 154 332 Cantu Galleano Ranch Road between Milliken Avenue and I-15 Freeway 6 0 20,245 55 0.5 1.8% 0.7% 66.9 62 133 287 617 Riverside Drive between Hammer Avenue and I-15 Freeway 2 10 8,780 45 0.5 1.8% 0.7% 60.8 - 53 114 245 "-" = contour is located within the roadway right-of-way.

Michael Baker International Page 2
2133

TRAFFIC NOISE LEVELS AND NOISE CONTOURS
Project Number: 177949
Project Name: Eastvale General Plan Update
Scenario: General Plan Update
Background Information
Model Description: FHWA Highway Noise Prediction Model (FHWA-RD-77-108) with California Vehicle Noise (CALVENO) Emission Levels.

Source of Traffic Volumes: Michael Baker International
Community Noise Descriptor: Ldn: CNEL: X
Assumed 24-Hour Traffic Distribution: Day Evening Night Total ADT Volumes 77.50% 12.90% 9.60%
Medium-Duty Trucks 84.80% 4.90% 10.30%
Heavy-Duty Trucks 86.50% 2.70% 10.80%
Design Vehicle Mix Distance from Centerline of Roadway
Analysis Condition Median ADT Speed Alpha Medium Heavy CNEL at Distance to Contour Roadway, Segment Lanes Width Volume (mph) Factor Trucks Trucks 100 Feet 70 CNEL 65 CNEL 60 CNEL 55 CNEL Limonite Avenue between Archibald Avenue and I-15 Freeway 6 5 81,577 50 0.5 1.8% 0.7% 71.9 135 290 626 1,348 65th Street between Coyote Trail Lane and Hammer Avenue 4 0 33,596 40 0.5 1.8% 0.7% 65.5 50 108 234 503 68th Street between Hammer Avenue and I-15 Freeway 4 10 15,363 45 0.5 1.8% 0.7% 63.4 - 78 169 363 Schleisman Road between Hellman Avenue and Hammer Avenue 6 0 44,689 45 0.5 1.8% 0.7% 68.2 75 163 350 755 Citrus Street between Harrison Avenue and Hammer Avenue 4 0 19,509 45 0.5 1.8% 0.7% 64.4 - 91 196 421 Chandler Street between Hellman Avenue and Harrison Avenue 4 20 12,564 45 0.5 1.8% 0.7% 62.6 - 69 149 322 River Road between Hellman Avenue and Archibald Avenue 4 10 18,823 45 0.5 1.8% 0.7% 64.3 - 90 193 416 River Road between Archibald Avenue and Southern City Limits 4 10 38,472 55 0.5 1.8% 0.7% 69.5 93 200 431 928 Milliken Avenue between Philadelphia Street and SR-60 EB Ramps 6 15 22,114 50 0.5 1.8% 0.7% 66.4 - 124 267 576 Hammer Avenue between SR-60 EB Ramps and Southern City Limits 4 10 39,522 50 0.5 1.8% 0.7% 68.6 81 174 375 808 Scholar Way between Bellegrave Avenue and Schleisman Road 2 0 9,068 35 0.5 1.8% 0.7% 58.4 - 36 79 169 Scholar Way between Schleisman Road and Citrus Street 4 10 13,252 35 0.5 1.8% 0.7% 60.2 - - 104 224 Summer Avenue between Bellegrave Avenue and Citrus Street 4 10 12,539 45 0.5 1.8% 0.7% 62.5 - 68 147 317 Harrison Avenue between Limonite Avenue and Chandler Street 4 10 14,075 45 0.5 1.8% 0.7% 63.0 - 74 159 343 Archibald Avenue between Limonite Avenue and River Road 6 15 31,306 50 0.5 1.8% 0.7% 67.9 73 156 337 726 Hellman Avenue between Northern Terminus and River Road 4 0 30,190 50 0.5 1.8% 0.7% 67.4 67 144 310 668 Bellegrave Avenue between Summer Avenue and I-15 Freeway 2 0 11,096 50 0.5 1.8% 0.7% 62.9 34 73 157 338 Cantu Galleano Ranch Road between Milliken Avenue and I-15 Freeway 6 0 20,675 55 0.5 1.8% 0.7% 66.9 63 135 291 626 Riverside Drive between Hammer Avenue and I-15 Freeway 2 10 8,994 45 0.5 1.8% 0.7% 60.9 - 54 115 249 "-" = contour is located within the roadway right-of-way.

Michael Baker International Page 3
2134

APPENDIX D
Transportation Analysis
2135
5050 Avenida Encinas, Suite 260 | Carlsbad, CA 92008 | Office: 760-476-9193 | Fax: 760-476-9198 | www.mbakerintl.com Technical Memorandum
Date: May 16, 2023
To: Gus Gonzalez, City of Eastvale
From: Dawn Wilson, PE, TE
Subject: Transportation Analysis – Eastvale General Plan Update Michael Baker completed the technical analysis in support of the Envision Eastvale 2040 General Plan Update in conjunction with modeling efforts conducted by Translutions. This technical memorandum outlines the approach to the modeling and the findings of the analysis conducted.

Land Use Assumptions
Land uses included in the General Plan include Single Family, Multifamily, Retail, Industrial Flex, Office space, Open Space and Right of Way. In addition to these general land use categories, the General Plan included five Policy Areas, which are primarily mixed use and demonstrate the greatest opportunity for growth and development in the City over the next 20 to 30 years. Table 1 summarizes the land use categories included in Envision Eastvale Land Use Element and the associated developed and vacant acres in each land use category.

Figure 1 on the following page illustrates the land uses included in the Land Use Element as well as the locations of the five policy areas.

2136
Transportation Analysis – Eastvale General Plan Update
2 | Page
Table 1. Proposed Land Uses – Eastvale General Plan Update Proposed Land Use Gross Acres Developed Vacant Acres
Single Family - Very Low 33.0 33.0 0.0
Single Family - Low 3,018.2 2,927.8 90.4
Single Family - Moderate 255.7 234.7 20.9
Multi Family - Low-Moderate 9.9 0.0 9.9
Commercial Retail 192.8 113.4 79.4
Industrial Flex 481.8 425.0 56.8
Business - Professional 405.1 331.5 73.5
Water 279.6 3.9 275.7
Open Space - Recreational 177.8 137.4 40.4
Riverfront Policy Area 1,369.9 138.8 1,231.1
Downtown West Policy Area 153.1 0.0 153.1
Chandler Policy Area 204.9 165.5 39.4
Downtown East Policy Area 130.2 127.0 3.2
Citrus Policy Area 36.1 11.2 24.9
Right-Of-Way 1,662.8 1,591.9 70.9
TOTAL 8,410.8 6,241.2 2,169.6
2137
Transportation Analysis – Eastvale General Plan Update
3 | Page
Figure 1: Envision Eastvale Land Use Map
2138
Transportation Analysis – Eastvale General Plan Update
4 | Page
Regional Travel Demand Model
The Riverside County Transportation Model (RIVCOM) was used to prepare the traffic forecasts and VMT for the current General Plan and the General Plan Update (Envision Eastvale). At the time the analysis was conducted, the RIVCOM 3.0 model was the most current model available and is consistent with the latest Southern California Association of Governments (SCAG) Regional Transportation Plan and Sustainable Communities Strategies (RTP/SCS).

The travel demand forecasting model uses traffic analysis zones (TAZ), which contains socioeconomic data (SED) and other model inputs. The key land use inputs used in calculating VMT include population, number of households, and types of employment. Employment is typically broken down by income level to forecast trip length, type and patterns. In addition, employment can be broken out by Industry Type (agriculture, construction, manufacturing, retail, professional services, etc).

When calculating VMT, residential VMT is based on Home Based trips (for all home-based trip types, productions only). Employment VMT is based on Home Based Work trips (attractions only). The process for calculating VMT using the model is outlined in the County of San Diego Transportation Analysis Guidelines (2020).

Modifications to RIVCOM 3.0
In December 2022, City of Eastvale provided land use revisions to SCAG relative to updated land uses within City of Eastvale. These edits were determined to be based on the existing General Plan land uses and not a reflection of the land uses proposed in the General Plan Update (Envision Eastvale).

Therefore, the process of updating the RIVCOM model for this General Plan Update was a two step process:

Step 1: Update land uses to reflect the Current General Plan based on SCAG model and input from City of Eastvale
Step 2: Update land uses to reflect the General Plan Update based on data included in the proposed land use element.

Tables 2 and 3 on the following pages summarizes the TAZs included in the City of Eastvale and the land use changed made for each step of the model development process. Figure 2 illustrates the locations of the TAZ’s within the City used in this analysis.

As shown, the adjustments to the RIVCOM model to reflect the baseline (Current General Plan) adds 116 single family units, reduces the multifamily units by 17 and increases employment by 17,343 employees.

Adjustments to the baseline model to reflect the General Plan Update increases both the single family (3,880 additional units) and multifamily (850 additional units) and a decrease in employment (3,924).

The reduction in employment is largely due to the changes in land uses planned for the Downtown West Policy Area.
2139
Transportation Analysis – Eastvale General Plan Update
5 | Page
Table 2: Land Use Adjustments to RIVCOM model for Baseline (Current General Plan) TAZ
RIVCOM 3.0 (2045) Adjusted for Current General Plan
Single Family Multi Family
Total
Employment Single Family Multi Family
Total
Employment
603 1,122 116 98 1,122 316 227
604 418 13 34 418 427 283
605 335 0 133 524 400 133
606 609 94 311 952 147 311
607 442 14 252 647 20 600
608 - - 1,454 - - 3,464
609 1 5 1,001 1 7 2,385
610 424 16 2 620 23 463
611 469 22 534 469 22 476
612 1,483 283 976 1,483 283 1,283
613 729 12 21 729 12 21
614 860 8 135 860 8 135
615 716 14 300 716 14 300
616 349 10 102 349 10 102
617 723 15 121 723 15 121
618 462 15 490 462 15 490
619 677 4 536 677 4 536
620 771 3 91 771 3 91
621 785 230 171 785 230 418
622 743 246 319 743 246 270
623 478 61 51 478 61 43
624 667 1,834 2,107 - 660 7,464
625 138 621 28 138 621 28
626 - - 1,803 - - 1,803
627 38 605 227 38 605 227
628 693 31 38 448 - 229
629 17 14 1,028 17 14 1,028
630 772 - 43 772 - 43
631 634 - 111 634 - 111
632 - - 2,499 - - 5,398
633 - - 1,180 - - 2,549
2140
Transportation Analysis – Eastvale General Plan Update
6 | Page
TAZ
RIVCOM 3.0 (2045) Adjusted for Current General Plan
Single Family Multi Family
Total
Employment Single Family Multi Family
Total
Employment
634 - - 267 - - 577
635 - - 221 - - 477
636 - - 683 - - 1,475
637 - 1 689 - 1 689
638 353 396 48 447 501 48
639 5 - 84 5 - 84
640 - - 0 - - -
641 - - 272 - - 1,421
Total 15,913 4,683 18,460 16,029 4,666 35,803

2141
Transportation Analysis – Eastvale General Plan Update
7 | Page
Table 3: Land Use Adjustments to RIVCOM model for Proposed General Plan (Envision Eastvale) TAZ
Adjusted for Current General
Plan
Adjusted for General Plan Update
(Envision Eastvale)
Modification Justification
Single
Family
Multi
Family
Total
Employment
Single
Family
Multi
Family
Total
Employment
603 1,122 116 98 1,422 416 356 Citrus Policy Area
604 418 13 34 418 427 283
605 335 0 133 524 400 133
606 609 94 311 1,152 420 519 Chandler Policy Area
607 442 14 252 647 20 600
608 - - 1,454 0 0 3,464
609 1 5 1,001 1 7 2,385
610 424 16 2 620 23 921
611 469 22 534 469 22 476
612 1,483 283 976 1,483 483 1,697 Citrus Policy Area
613 729 12 21 729 12 21
614 860 8 135 860 8 135
615 716 14 300 716 14 300
616 349 10 102 349 10 102
617 723 15 121 723 15 121
618 462 15 490 612 15 490 Growth Area
619 677 4 536 977 4 536 Growth Area
620 771 3 91 771 3 91
621 785 230 171 785 230 605 Downtown East Policy Area
622 743 246 319 743 246 270
623 478 61 51 478 61 215 Downtown West Policy Area
624 667 1,834 2,107 1,840 660 1,781 Downtown West Policy Area 625 138 621 28 738 721 28 Growth Area
626 - - 1,803 0 0 1,803
627 38 605 227 238 705 227 Growth Area
628 693 31 38 616 45 420 Growth Area
629 17 14 1,028 138 14 1,028 Growth Area
630 772 - 43 772 0 43
631 634 - 111 634 0 111
632 - - 2,499 0 0 5,398
2142
Transportation Analysis – Eastvale General Plan Update
8 | Page
TAZ
Adjusted for Current General
Plan
Adjusted for General Plan Update
(Envision Eastvale)
Modification Justification
Single
Family
Multi
Family
Total
Employment
Single
Family
Multi
Family
Total
Employment
633 - - 1,180 0 0 2,549
634 - - 267 0 0 577
635 - - 221 0 0 477
636 - - 683 0 0 1,475
637 - 1 689 0 33 689 Downtown East Policy Area
638 353 396 48 447 501 48
639 5 - 84 5 0 84
640 - - 0 0 0 0
641 - - 272 0 0 1,421
Total 16,029 4,666 35,803 19,908 5,516 31,879

2143
Transportation Analysis – Eastvale General Plan Update
9 | Page
Figure 2: RIVCOM TAZ Map

2144
Transportation Analysis – Eastvale General Plan Update
10 | Page
Traffic Volume Forecast
Daily traffic volumes generated by the model were post-process based on existing ground counts analyzed in the Existing Conditions report for the General Plan Update. Table 4 summarizes the daily traffic volumes for the Existing Conditions, Current General Plan and General Plan update. Figures 3 and 4 illustrate the levels of service for the roadway segments studied.

Vehicle Miles Travel Findings.

In addition to calculating the daily traffic volumes along the roadway segments, the model was used to forecast citywide VMT for the Current General Plan and the General Plan Update. Table 5 summarizes the results of the VMT analysis. As shown, the General Plan Update results in an increase in Citywide population and a reduction in number of employees. As such the Homebased VMT (productions) increase and Homebased Work VMT (attractions) decrease as a result of the General Plan Update.

Evaluating the residential VMT metric, the General Plan Update VMT per capita decreases compared to both the existing (2018) condition and the Current General Plan. For the employment metric, the General Plan Update results in a decrease in VMT per employee over the existing condition (2018 Eastvale), but the decrease is less than what was previously forecast for the Current General Plan.

Both the VMT per capita and the VMT per employee are well above the Countywide average for year 2045, but are a reduction over the existing conditions indicating the land uses planned in the City align with the regional goal of reducing VMT.
2145
Transportation Analysis – Eastvale General Plan Update
11 | Page
Figure 3: Current General Plan Daily Volumes and LOS
2146
Transportation Analysis – Eastvale General Plan Update
12 | Page
Figure 4: General Plan Update Daily Volumes and LOS
2147
Transportation Analysis – Eastvale General Plan Update
13 | Page
Table 4: Roadway Segment Operational Analysis
Roadway From To
Travel
Lanes
(2-way)
Roadway
Classification Per
Riverside County
TIA Guidelines
Capacity
Existing (2022) Current General Plan Change in ADT
(ProposedCurrent)
General Plan Update
ADT V/C Ratio LOS ADT V/C Ratio LOS ADT V/C
Ratio LOS
Limonite Avenue Archibald Avenue I-15 Freeway 6 Urban Arterial 48,500 49,500 1.02 F 80,320 1.66 F 1,802 81,577 1.68 F 65th Street Coyote Trail Lane Hamner Avenue 4 Secondary 23,300 10,900 0.47 A 30,202 1.30 F 342 33,596 1.44 F 68th Street Hamner Avenue I-15 Freeway 4 Major 30,700 26,700 0.87 D 13,825 0.45 A 911 15,363 0.50 A Schleisman Road Hellman Avenue Hamner Avenue 6 Urban Arterial 48,500 40,000 0.82 D 43,332 0.89 D 1,907 44,689 0.92 E Citrus Street Harrison Avenue Hamner Avenue 4 Secondary 23,300 13,200 0.57 A 17,504 0.75 C 2,437 19,509 0.84 D Chandler Street Hellman Avenue Harrison Avenue 4 Arterial 32,300 7,000 0.22 A 12,530 0.39 A 78 12,564 0.39 A River Road Hellman Avenue Archibald Avenue 4 Major 30,700 16,966 0.55 A 19,014 0.62 B -302 18,823 0.61 B River Road Archibald Avenue Southern City
Limits
4 Major 30,700 40,255 1.31 F 38,014 1.24 F 671 38,472 1.25 F Milliken Avenue Philadelphia Street SR-60 EB Ramps 6 Urban Arterial 48,500 21,300 0.44 A 21,890 0.45 A 776 22,114 0.46 A Hamner Avenue SR-60 EB Ramps Southern City
Limits
4 to 6 Urban Arterial 48,500 32,600 0.67 B 35,582 0.73 C 4,988 39,522 0.81 D Scholar Way Bellegrave Avenue Schleisman Road 2 Secondary 23,300 7,300 0.31 A 8,234 0.35 A 894 9,068 0.39 A Scholar Way Schleisman Road Citrus Street 4 Secondary 23,300 7,300 0.31 A 11,364 0.49 A 1,902 13,252 0.57 A Sumner Avenue Bellegrave Avenue Citrus Street 4 Major 30,700 11,100 0.36 A 12,330 0.40 A 685 12,539 0.41 A Harrison Avenue Limonite Avenue Chandler Street 4 Secondary 23,300 9,700 0.42 A 13,617 0.58 A 1,267 14,075 0.60 B Archibald Avenue Limonite Avenue River Road 6 Urban Arterial 48,500 30,700 0.63 B 30,025 0.62 B 2,083 31,306 0.65 B Hellman Avenue Northern Terminus River Road 4 Secondary 23,300 21,917 0.94 E 29,945 1.29 F 431 30,190 1.30 F Bellegrave Avenue Sumner Avenue I-15 Freeway 2 to 4 Major 30,700 7,300 0.24 A 10,824 0.35 A 1,175 11,096 0.36 A Cantu Galleano
Ranch Road
Milliken Avenue I-15 Freeway 6 Urban Arterial 48,500 12,200 0.25 A 20,245 0.42 A 2,092 20,675 0.43 A Riverside Drive Hamner Avenue I-15 Freeway 2 to 4 Secondary 23,300 6,500 0.28 A 8,780 0.38 A 444 8,994 0.39 A 2148
Transportation Analysis – Eastvale General Plan Update
14 | Page
Table 5. VMT Assessment Findings
2045
2018
Eastvale*
Current General
Plan
General Plan
Update
2045 Riverside
County*
Population 63,243 71,654 89,154 3,424,454
Employment 6,867 35,807 31,881 1,116,025
Service Population 70,110 107,461 121,035 4,540,479

Homebased (HB) VMT 1,496,135 1,637,725 1,998,142 63,976,131 Homebased Work (HBW) VMT 404,430 1,680,878 1,540,035 32,318,620 OD VMT (auto only) 2,747,934 4,723,531 5,097,010 145,958,343 OD VMT (auto + truck) 2,889,694 4,957,197 5,354,161 152,940,057 HB VMT per capita 23.7 22.9 22.4 18.7
HBW VMT per employee 58.9 46.9 48.3 29.0
OD VMT per service population
(auto only) 39.2 44.0 42.1 32.1
OD VMT per service population
(auto + truck) 41.2 46.1 44.2 33.7
Recommendations
City of Eastvale is largely built out and will result in only minor spot improvements over the next 20 years or so. Therefore, operational improvements within the City should focus on addressing delays at intersections and providing travel options that reduce overall dependence on automobile travel. Smart signals, improved traffic signal communication infrastructure and other features should be integrated into the City’s traffic signal system to ensure that traffic flow and capacity is optimized along the City’s busiest corridors. Fee programs may be considered to help fund citywide network improvements.

Providing travel options and accommodating multiple travel modes within the public right of way will reduce reliance on the single occupant vehicle trips. Excess space within the right-of-way should be repurposed to provide new, enhanced pedestrian and bicycle facilities. Repurposing can be accomplished without reducing capacity by reducing the width of existing travel lanes and center medians. Providing mobility hubs and charging stations for e-assist bikes or scooters will provide the necessary resources to make these modes viable throughout the City.

In addition, the City should continue to coordinate with local and regional agencies to provide new or enhanced transit service that connects to regional rail and bus routes – further providing travel options for Eastvale’s residents and employees.
2149
City of Eastvale
Eastvale 2040 General Plan
Final Environmental Impact
Report
March 2024
SCH No: 2022080090
2150
2151

FINAL ENVIRONMENTAL IMPACT REPORT
Eastvale 2040 General Plan
SCH No. 2022080090
Lead Agency:

City of Eastvale, Planning Division
12363 Limonite Avenue, Suite 910
Eastvale, California 91752
Preparer:

Michael Baker International
3536 Concours Street, Suite 100
Ontario, California 91764
MARCH 2024
2152
Eastvale 2040 General Plan Update
Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2153
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | i

TABLE OF CONTENTS

1. Introduction........................................................................................................................... 1

2. Organization of the Final EIR.................................................................................................. 1

3. CEQA Process Summary......................................................................................................... 1

4. Changes to the Draft EIR........................................................................................................ 2 Draft EIR Section 2.0, Project Description, page 2.0-12 ..................................................... 3 Draft EIR Section 3.7, Land Use and Planning, page 3.7-11............................................... 4 Draft EIR Section 3.9, Population and Housing, page 3.9-10 ............................................. 5

5. Comment Letters and Responses to Comments.................................................................... 5 Comment Letter No. 1
Xitlaly Madrigal (Agua Caliente Band of Cahuilla Indians) ....................................... 7 Comment Letter No. 2
Andrew Salas (Gabrieleño Band of Mission Indians) .............................................. 11 Comment Letter No. 3
Elsa McKinney (Riverside County Flood Control and Water Conservation District). 15 Comment Letter No. 4
Dave Kereazis (California Department of Toxic Substances Control) ...................... 19 Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District) ................................... 25 Comment Letter No. 6
Chris Berch, PE (Jurupa Community Services District)............................................. 37 Comment Letter No. 7
Chris Cortez (City of Chino) ..................................................................................... 47 Comment Letter No. 8
Jaqueline Vega (Riverside County Airport Land Use Commission) .......................... 51 Comment Letter No. 9
Miguel Vasquez, AICP (Riverside University Health System)................................... 55 2154
Eastvale 2040 General Plan Update
Page | ii Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2155
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 1

1. Introduction
The Final Environmental Impact Report (EIR) for the City of Eastvale 2040 General Plan Amendment project (project) has been prepared in accordance with the California Environmental Quality Act (CEQA) (California Public Resources Code Section 21000 et seq.), and the CEQA Guidelines (14 California Code of Regulations, Division 6, Chapter 3). CEQA Guidelines Section 15132 indicates that the contents of a Final EIR shall consist of:
• The Draft EIR or a revision of the Draft EIR;
• Comments and recommendations received on the Draft EIR, either verbatim or in summary;
• A list of persons, organizations, and public agencies commenting on the Draft EIR; • The responses of the lead agency to significant environmental points raised in the review and consultation process; and
• Any other information added by the lead agency.

The Draft EIR and the Final EIR, along with public comments, will be considered by the City of Eastvale (City) in determining whether to certify the Final EIR and approve the project.

2. Organization of the Final EIR
This Final EIR provides the requisite information required under CEQA and is organized as follows:
• Introduction to the Environmental Analysis. This section introduces the Final EIR, including the requirements under CEQA, and the organization of the document, as well as a summary of the CEQA process activities to date.
• Comment Letters and Responses to Comments. This section lists the public agencies, organizations, and individuals commenting on the Draft EIR, provides a copy of each written comment received, and includes any response required under CEQA.

3. CEQA Process Summary
The City released the Draft EIR to the public on October 31, 2023, for a 45-day review ending on December 15, 2023. During the public review period, the Draft EIR was available for review on the City’s website at https://www.eastvaleca.gov/our-city/what-s-new/eastvale-2040. Pursuant to Section 15082 of the CEQA Guidelines, a Notice of Availability (NOA) was also circulated by the California Governor’s Office of Planning and Research State Clearinghouse (SCH No. 2022080090) to responsible State agencies for a 45-day public review period commencing on October 31, 2023.

All comment letters received during the 45-day NOA public review period are found in Final EIR Appendix A, Notice of Availability and Comment Letters. 2156
Eastvale 2040 General Plan Update
Page | 2 Final Environmental Impact Report
Additionally, hard copies were available at the City’s Planning Division, 12363 Limonite Ave. Suite 910 Eastvale, CA 91752. Responses were received from two tribes(Agua Caliente Band of Cahuilla Indians and Gabrieleño Band of Mission Indians); two State agencies (California Department of Toxic Substance Control [DTSC] and South Coast Air Quality Management District [SCAQMD]); one local agency (Jurupa Community Services District [JCSD], and one city (City of Chino).

Following close of the public review period, one additional letter was received from an agency (Riverside County Airport Land Use Commission [ALUC]), and one additional letter was received from an organization (Riverside University Health System).

An Open House for the Draft Eastvale 2040 General Plan and Draft EIR was held on December 6, 2023, from 6:00 p.m. to 8:00 p.m. at Eastvale City Hall (Council Chambers). No comments were received on the Draft EIR during the December 6, 2023 Open House.

Upon review and consideration of the Final EIR, the City may take action to adopt, revise, or reject the proposed project. A decision to approve the proposed project would be accompanied by written findings (Findings of Fact) in accordance with CEQA Guidelines Section 15091. The Findings of Fact are available under separate cover.

4. Changes to the Draft EIR
Changes have been made to the Draft EIR in strikeout/underline format in response to comments and to provide updates and clarifications to information provided herein. Consistent with CEQA Guidelines Section 15088.5(b), these revisions have been made to clarify text for consistency or revise punctuation as appropriate throughout the document, and these revisions do not result in what constitutes new significant information that would require recirculation of the document.

CEQA Guidelines Section 15088.5 describes when an EIR requires recirculation prior to certification, stating in relevant part:
a) A lead agency is required to recirculate an EIR when significant new information is added to the EIR after public notice is given of the availability of the draft EIR for public review under Section 15087 but before certification. As used in this section, the term “information” can include changes in the project or environmental setting as well as additional data or other information. New information added to an EIR is not “significant” unless the EIR is changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the project or a feasible way to mitigate or avoid such an effect (including a feasible project alternative) that the project’s proponents have declined to implement.
b) Recirculation is not required where the new information added to the EIR merely clarifies or amplifies or makes insignificant modifications in an adequate EIR. 2157
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 3
The changes to the Draft EIR described herein clarify or make insignificant changes to an adequate EIR, and do not constitute significant new information, as defined by CEQA Guidelines Section 15088.5. None of the changes or information provided in the comments reflect a new significant environmental impact, a substantial increase in the severity of an environmental impact for which mitigation is not proposed, or a new feasible alternative or mitigation measure that would clearly lessen significant environmental impacts but is not adopted. Therefore, the Draft EIR is not subject to recirculation prior to certification.

Text revisions are identified as follows:
• Deletions are indicated by strikeout text
• Additions are indicated by double underline text
Draft EIR Section 2.0, Project Description, page 2.0-12 Downtown West Policy Area
The Downtown West Policy Area is part of a 153.1-acre area along Limonite that is envisioned as the center piece of Eastvale’s future downtown, encompassing the Leal Master Plan (LMP). The property, located at the northwest intersection of Limonite and Hamner Avenues is intended to provide for a range of housing, retail, restaurants, hospitality, entertainment, and civic uses in a walkable urban environment. The property may also be suitable for a satellite college or university campus, or medical related uses. A range of housing types between 20.1 and 40 dwelling units per acre is allowed, with a minimum requirement of 2,500 units, in compliance with the certified 2021-2029 Housing Element update. The certified Housing Element allows 660 units at a density of 26.4 to 40 dwelling units per acre (du/ac), 730 units at a density of 22 to 40 du/ac, and 1,110 units at a density of 14 to 21 du/ac. To better accommodate density and proposed multiple-family projects in the LMP, Eastvale 2040 would shift 40 units from the 14 to 21 du/ac range to the 26.4 to 40 du/ac range, for a total of 700 units in this range. The overall maximum of 2,500 total units of the Downtown West Policy Area and LMP would remain unchanged. Non-residential uses can range from 0.25 to 1.5 FAR. 2158
Eastvale 2040 General Plan Update
Page | 4 Final Environmental Impact Report
Draft EIR Section 3.7, Land Use and Planning, page 3.7-11 City of Eastvale Land Use Plans, Policies, and Regulations The proposed project, Eastvale 2040, will update all the State-required General Plan elements of the City’s existing 2012 General Plan, including Land Use, Circulation, Housing, Conservation, Open Space, Noise, and Safety. Eastvale 2040 plan also addresses urban design, environmental justice, economic development, public health, and sustainability. Major components of Eastvale 2040 include:
• Update existing conditions, with year 2022 serving as the baseline year. • Update the General Plan development projections to the year 2040, the Eastvale 2040 planning period.
• Reorganization of the State-mandated General Plan elements into the following Eastvale 2040 subsections:
o Partnerships and Collaboration
o Built Environment
o Nature and Conservation
o Implementation
• Update the Land Use Element and Land Use Map with new land use designations and policy areas.
• Update existing General Plan Elements to reflect current conditions and new development projections.
• Add, delete, or modify existing General Plan Element goals and policies. • Add the certified 2021-2029 Housing Element update.

The actions identified above will require an update the City’s Zoning Code and Zoning Map. The City is responsible for ensuring that consistency revisions to the Municipal Code occur shortly after adoption of the General Plan. In areas of the City that are largely built out, the changes proposed by the Eastvale 2040 General Plan would entail little to no modifications to the existing table of land uses and/or development standards. In the policy areas where there are opportunities for new development to take place over time, both the allowable land uses and the expected density and intensity of development will be increased to allow for increased development.

The certified Housing Element allows 660 units at a density of 26.4 to 40 dwelling units per acre (du/ac), 730 units at a density of 22 to 40 du/ac, and 1,110 units at a density of 14 to 21 du/ac.

To better accommodate density and proposed multiple-family projects in the Leal Master Plan 2159
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 5
(LMP), Eastvale 2040 would shift 40 units from the 14 to 21 du/ac range to the 26.4 to 40 du/ac range, for a total of 700 units in this range. The overall 2,500 total units of the Downtown West Policy Area and LMP would remain unchanged.

Draft EIR Section 3.9, Population and Housing, page 3.9-10 Although buildout of the Eastvale 2040 General Plan would exceed population growth in the City over the projections of the 2020 RTP/SCS, growth projections identified by SCAG rely upon the growth projections as identified in the General Plans prepared by counties and cities within the region. In this case, SCAG utilized the 2012 Eastvale General Plan, which forecasted the remaining undeveloped areas of the City being developed at lower densities. The Eastvale 2040 General Plan recognizes that much of the City is fully developed and concentrates future growth into four main policy areas (Downtown West Policy Area, Downtown East Policy Area, Chandler Policy Area, and Citrus Policy Area) at higher densities than originally considered. Therefore, future growth anticipated with buildout of the Eastvale 2040 General Plan would be considered in SCAG’s updated projections for the City for the 2024 RTP/SCS and other future plans.

The certified Housing Element allows 660 units at a density of 26.4 to 40 dwelling units per acre (du/ac), 730 units at a density of 22 to 40 du/ac, and 1,110 units at a density of 14 to 21 du/ac.

To better accommodate density and proposed multiple-family projects in the Leal Master Plan (LMP), Eastvale 2040 would shift 40 units from the 14 to 21 du/ac range to the 26.4 to 40 du/ac range, for a total of 700 units in this range. The overall 2,500 total units of the Downtown West Policy Area and LMP would remain unchanged.

5. Comment Letters and Responses to Comments
As stated above, a Draft EIR was prepared and circulated for public review for a 45-day period from October 31, 2023 to December 15, 2023. During that time, the City received a total of seven comment letters. All comments have been assigned a numeric label, and the individual comments identified in each written comment letter are bracketed and numbered sequentially.

Additionally, the City received two comment letters after the close of the public comment period and has elected to provide responses to relevant environmental issues raised in those comment letters (Comment Letter numbers 8 and 9).

The City’s responses to each comment received on the Draft EIR represent a good-faith, reasoned effort to address the environmental issues identified by the comments. Under the State CEQA Guidelines, the City is not required to respond to all comments on the Draft EIR, but only those comments that raise environmental issues. In accordance with CEQA Guidelines Sections 15088 and 15204, the City has independently evaluated the comments and prepared the attached written responses describing the disposition of any significant environmental issues raised. CEQA 2160
Eastvale 2040 General Plan Update
Page | 6 Final Environmental Impact Report
does not require the City to conduct every test or perform all research, study, and experimentation recommended or demanded by commenters.

The table below lists those parties that provided written comments on the Draft EIR during the public review period. A copy of each comment letter is provided in this section. Comments provided in each letter have been numbered for ease of reference to the City’s corresponding response that follows.

Comments Received During Public Review Period (October 31, 2023 to December 15, 2023) Letter Number Organization/Name Date of Letter
Agencies
1 Agua Caliente Band of Cahuilla Indians (Xitlaly Madrigal) October 31, 2023 2 Gabrieleño Band of Mission Indians (Andrew Salas) November 6, 2023 3 Riverside County Flood Control and Water Conservation District (Elsa McKinney)
December 13, 2023
4 California Department of Toxic Substances Control (Dave Kereazis) November 22, 2023 5 South Coast Air Quality Management District (Sam Wang) December 15, 2023 6 Jurupa Community Services District (Chris Berch, PE) December 15, 2023 7 City of Chino (Chris Cortez) December 13, 2023
Comments Received Subsequent to Public Review Period (after December 15, 2023) Letter Number Organization/Name Date of Letter
8 Riverside County Airport Land Use Commission (Jackie Vega) December 19, 2023 9 Riverside University Health System (Miguel Vasquez, AICP) December 21, 2023 2161
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 7
Comment Letter No. 1
Xitlaly Madrigal (Agua Caliente Band of Cahuilla Indians)

Page 1 of 1 ends

2162
Eastvale 2040 General Plan Update
Page | 8 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2163
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 9
Response No. 1
Xitlaly Madrigal (Agua Caliente Band of Cahuilla Indians) December 22, 2023
1-1 The commenter represents the Agua Caliente Band of Cahuilla Indians and states the tribe defers to other tribes in the area, as the Agua Caliente Band of Cahuilla Indian’s Traditional Use Area does not include the City of Eastvale. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA. Therefore, no further response is warranted. (CEQA Guidelines Section 15088(a) requires that a lead agency only evaluate and respond to comments raised on environmental issues.) 2164
Eastvale 2040 General Plan Update
Page | 10 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2165
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 11
Comment Letter No. 2
Andrew Salas (Gabrieleño Band of Mission Indians)

Page 1 of 1 ends

2166
Eastvale 2040 General Plan Update
Page | 12 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2167
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 13
Response No. 2
Andrew Salas (Gabrieleño Band of Mission Indians)
December 27, 2023
2-1 The commenter represents the Gabrieleño Band of Mission Indians and remarks that they agree with the Eastvale 2040 General Plan and request consultation for all future projects within the plan area. As described in Draft EIR Section 3.12, Tribal Cultural Resources, in accordance with Eastvale Municipal Code Section 110.52.060, the City would review any major environmental issues associated with the individual development proposals, including the project’s potential to impact tribal cultural resources. Future site specific development proposals subject to CEQA would also be required to undergo governmentto-government consultation in accordance with Assembly Bill 52 (AB 52) requirements, and would be required to adhere to State and Federal regulations, as well as projectspecific mitigation measures to reduce impacts to tribal cultural resources. 2168
Eastvale 2040 General Plan Update
Page | 14 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2169
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 15
Comment Letter No. 3
Elsa McKinney (Riverside County Flood Control and Water Conservation District)

Page 1 of 2 ends

2170
Eastvale 2040 General Plan Update
Page | 16 Final Environmental Impact Report
Comment Letter No. 3
Elsa McKinney (Riverside County Flood Control and Water Conservation District)

Page 2 of 2 ends

2171
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 17
Response No. 3
Elsa McKinney (Riverside County Flood Control and Water Conservation District) December 26, 2023
3-1 The commenter represents the Riverside County Flood Control and Water Conservation District and verifies that implementation of the Eastvale 2040 General Plan will not have any impacts to storm drain facilities within their jurisdiction. The commenter also requests inclusion of several individuals to the City’s distribution list. The City of Eastvale affirms that the individuals identified for the District have been included in the City’s public interest list for Eastvale 2040 and will be notified of any subsequent environmental documents and public hearings for the project.
2172
Eastvale 2040 General Plan Update
Page | 18 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2173
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 19
Comment Letter No. 4
Dave Kereazis (California Department of Toxic Substances Control)

Page 1 of 3 ends

2174
Eastvale 2040 General Plan Update
Page | 20 Final Environmental Impact Report
Comment Letter No. 4
Dave Kereazis (California Department of Toxic Substances Control)

Page 2 of 3 ends

2175
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 21
Comment Letter No. 4
Dave Kereazis (California Department of Toxic Substances Control)

Page 3 of 3 ends

2176
Eastvale 2040 General Plan Update
Page | 22 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2177
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 23
Response No. 4
Dave Kereazis (California Department of Toxic Substances Control) December 28, 2023
4-1 The commenter represents the California Department of Toxic Substances Control (DTSC) and remarks that the project area contains several active and nonactive mitigation and clean-up sites within the agency’s jurisdiction, and that construction activities associated with the Eastvale 2040 General Plan could be restricted to alleviate potential impacts to human health and the environment. As detailed in Draft EIR Section 3.5, Hazards and Hazardous Materials, a search of the EnviroStor database on June 20, 2023 yielded ten sites, five of which were school investigations. A search of the GeoTracker database on June 20, 2023, yielded sixteen sites within Eastvale. None of the sites are currently open for verification monitoring; all cases have been closed. No results were found on the United States Environmental Protection Agency (USEPA) National Priority List, Superfund Enterprise Management System, or Envirofacts databases. The database search results are listed in Draft EIR Table 3.5-1, Hazardous Materials Sites in Eastvale, and are shown on Draft EIR Exhibit 3.5-1, Hazardous Materials and Cleanup Sites.

As further detailed in Draft EIR Section 3.5, to reduce impacts associated with unknown hazardous wastes, future development under the Eastvale 2040 General Plan would be required to prepare project-specific Phase I Environmental Site Assessments(Phase I ESA) for any properties identified on any list of hazardous materials compiled pursuant to Government Code Section 65962.5. The Phase I ESAs would be prepared in accordance with ASTM Standard Practice E 1527-05 or the Standards and Practices for All Appropriate Inquiry (AAI), prior to any demolition or construction activities. The Phase I ESAs would identify specific Recognized Environmental Conditions (RECs) which may require further sampling/remedial activities by a qualified Hazardous Materials Specialist with Phase II/site characterization experience. If the Phase I ESAs reveals RECs, a Hazardous Materials Specialist would be charged with identifying site-specific remedial activities, which would be strictly controlled by local, State, and Federal requirements. Thus, potential impacts to human health and the environment would be less than significant. 4-2 The commenter requests further information regarding the project site and if/where the site falls under their jurisdiction, which can be provided via Envirostor, DTSC’s publicfacing database. As described in Response to Comment 4-1, a search of the EnviroStor database on June 20, 2023 yielded ten sites. The database search affirmed that none of the sites are currently open for verification monitoring; all cases have been closed and no further action is required. Refer also to Draft EIR Table 3.5-1 and Draft EIR Exhibit 3.5-1. 4-3 This comment provides concluding remarks. Refer to the responses above. 2178
Eastvale 2040 General Plan Update
Page | 24 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2179
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 25
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 1 of 7 ends

2180
Eastvale 2040 General Plan Update
Page | 26 Final Environmental Impact Report
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 2 of 7 ends

2181
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 27
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 3 of 7 ends

2182
Eastvale 2040 General Plan Update
Page | 28 Final Environmental Impact Report
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 4 of 7 ends

2183
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 29
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 5 of 7 ends

2184
Eastvale 2040 General Plan Update
Page | 30 Final Environmental Impact Report
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 6 of 7 ends

2185
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 31
Comment Letter No. 5
Sam Wang (South Coast Air Quality Management District)

Page 7 of 7 ends

2186
Eastvale 2040 General Plan Update
Page | 32 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2187
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 33
Response No. 5
Sam Wang (South Coast Air Quality Management District)
December 15, 2023
5-1 The commenter represents the South Coast Air Quality Management District (SCAQMD) provides a brief summary of the Draft EIR. Responses to specific comments are provided below.
5-2 The commenter summarizes the impact analysis from the Air Quality Impacts During Construction section of the Draft EIR and reiteratesthe Leady Agency’s findings that there are no feasible mitigation measures are available for the aforementioned impacts. As noted in Draft EIR Section 3.1, Air Quality, SCAQMD thresholds are intended to evaluate the air quality impacts from individual development projects and do not apply to planlevel projects, such as the proposed Eastvale 2040 General Plan. Emissions are dependent on the exact size, nature, and location of an individual land use type, combined with reductions in localized impacts from the removal of existing land use types, as applicable (i.e., conversion of light industrial uses). Emissions associated with the operation of individual projects could exceed project-specific thresholds established by SCAQMD.

The proposed project allows for land use intensification in certain portions of the Planning Area. Future construction-related emissions could lead to the violation of an applicable air quality standard or contribute substantially to an existing or projected air quality violation. It should be noted that, the policies contained in the Eastvale 2040 General Plan Open Space and Conservation Element address potential air quality impacts in the City by requiring dust control plans, revegetation, and soil compaction to prevent fugitive dust emissions for both active construction sites, and vacant sites approved for future development; refer to Draft EIR Impact 3.1-1.

In addition, the proposed Land Use Element aims to address air quality of the Planning Area through a balanced growth that maintains economic diversity and environmental integrity that meets the needs of Eastvale’s residents. Furthermore, the Eastvale Municipal Code Section 120.02.010 requires all land use and development review applications referenced in Chapter 120.02 (such as zone changes, conditional use permits, subdivisions, etc.) and all public works and other public projects to undergo environmental review as an integral part of the process for such applications prior to consideration by the decision-making authority. Individual development projects under the proposed Eastvale 2040 General Plan would be required to undergo subsequent environmental review pursuant to CEQA and would be required to employ all applicable mitigation measures to reduce construction-related emissions. All future projects developed under Eastvale 2040 would also be required to comply with SCAQMD rules and regulations. Furthermore, future construction activities under the proposed Eastvale 2188
Eastvale 2040 General Plan Update
Page | 34 Final Environmental Impact Report
2040 General Plan would be required to comply with the CARB Air Toxics Control Measure, which limits diesel powered equipment and vehicle idling to no more than five minutes at a location, and the CARB In-Use Off-Road Diesel Vehicle regulation, CARB Truck and Bus regulation, and CARB ACT regulation, all of which require operators to repower or replace higher-emitting construction equipment with less polluting models and employ zero- and near-zero-emissions on-road truck technologies as they become developed and commercially available on vehicle fleet. Additionally, construction of future development would be required to comply with SCAQMD rules and regulations including Rule 403 for the control of fugitive dust and Rule 1113 for the control of VOC emissions from architectural coatings. Mandatory compliance with these CARB and SCAQMD rules and regulations would reduce emissions, particularly for NOX, PM10, and PM2.5, during future construction activities under Eastvale 2040.

In summary, as a policy-level document, site-specific mitigation measures would most appropriately be applied at the time individual projects are proposed. With a 20-year planning horizon, the suggested construction-related mitigation measures included in Comment 5-5 would run the risk of becoming outdated if included in the EIR (i.e., requiring that, at a minimum, future development use 2014 and newer haul trucks).

Future development projects would be required to comply with Eastvale Municipal Code Section 120.02.010 and all applicable SCAQMD rules and regulations, as well as other control measures to reduce construction emissions. However, even with mandatory compliance with CARB and SCAQMD rules regulations, it is possible that some future development projects could be large enough in scale and/or intensity such that many pieces of heavy-duty construction equipment and/or heavy-duty trucks may be required and that construction period emissions could exceed the SCAQMD significance thresholds. Therefore, impacts would be considered significant and unavoidable. 5-3 The commenter summarizes the findings from the Air Quality Impacts During Operation section of the Draft EIR and restates that the Lead Agency did not identify any feasible mitigation measures for the aforementioned impacts. As described in Draft EIR Section

3.1, the proposed project would allow for additional residential and non-residential development over existing conditions. As a result, area source ROG emissions are expected to increase from existing conditions. However, mobile source ROG, NOX, and CO emissions would decrease despite a projected increase in vehicle trips. This can be attributed to improved vehicle emissions standards, improved fuel efficiency, and a newer model year vehicle fleet during the planning period. However, the thresholds of significance that have been recommended by the SCAQMD are based on the SCAQMD’s General Plan guidance and New Source Review emissions standards for individual sources of new emissions, such as boilers and generators. As the thresholds were established for 2189
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 35
individual development projects, they do not apply to cumulative development or multiple projects. Air quality impacts would be regional and not confined to the limits of the Planning Area. The destinations of motor vehicles, which are the primary contributors to air pollution, vary widely and cross many jurisdictional boundaries. Future site-specific development proposals would be evaluated for potential air emissions once development details have been determined and are available, and individual projects may or may not result in significant operational air quality emissions.

Furthermore, proposed policies in the Eastvale 2040 General Plan aim to improve air quality within the Planning Area by encouraging innovative approaches such as improvements to indoor air quality through the California Building and Energy Codes and through the participation in public health programs and services, promoting compact and efficient development to minimize vehicle miles traveled and greenhouse gas emissions, and implementing all SCAQMD’s applicable rules and regulations to reduce air pollution; refer to Draft EIR Impact 3.1-1. Future development proposals accommodated by Eastvale 2040 would be subject to subsequent environmental review pursuant to CEQA and would be required to employ all applicable mitigation measures to reduce operational emissions.

In summary, as a policy-level document, site-specific mitigation measures would most appropriately be applied at the time individual projects are proposed. With a 20-year planning horizon, the suggested operational mitigation measures included in Comment 5-5 would run the risk of becoming outdated if included in the EIR (i.e., the mitigation measures included in the 2022 South Coast Air Quality Management Plan). Given the volume of air pollutants attributable to buildout of the proposed Planning Area, the Draft EIR conservatively determined that impacts would be considered significant and unavoidable. No change is necessary nor required in this regard. 5-4 The commenter reiterates that the Draft EIR is intended to be succinct to tier off from future projects accommodated by the Eastvale 2040 General Plan, and remarks that SCAQMD staff disagree with the Lead Agency’s findings that there are no feasible mitigation measures available for the impacts described in the Draft EIR, and that that feasible mitigation measures exist for aforementioned impacts (against the findings of the Lead Agency). Refer to Responses 5-2 and 5-3 above. 5-5 The commenter offers several recommended mitigation measures to reduce impacts to air quality during construction and operation of projects accommodated by the Eastvale 2040 General Plan, and suggests multiple references to substantiate these suggestions.

Refer to Responses 5-2 and 5-3 above.
2190
Eastvale 2040 General Plan Update
Page | 36 Final Environmental Impact Report
5-6 The commenter summarizes California Public Resources Code Section 21092.5(a) and CEQA Guidelines Section 15088(a-b) stating that the Lead Agency shall evaluate comments from public agencies regarding environmental issues and provide a written response at least 10 days prior to certification of the Final EIR, and continues to request that detailed reasons supported by substantial evidence to explain why specific comments and suggestions are not incorporated must be provided. The City of Eastvale affirms that SCAQMD will continue to be included in the City’s public interest list for Eastvale 2040 and will be notified of any subsequent environmental documents and public hearings for the project.
2191
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 37
Comment Letter No. 6
Chris Berch, PE (Jurupa Community Services District)

Page 1 of 5 ends

2192
Eastvale 2040 General Plan Update
Page | 38 Final Environmental Impact Report
Comment Letter No. 6
Chris Berch, PE (Jurupa Community Services District)

Page 2 of 5 ends

2193
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 39
Comment Letter No. 6
Chris Berch, PE (Jurupa Community Services District)

Page 3 of 5 ends

2194
Eastvale 2040 General Plan Update
Page | 40 Final Environmental Impact Report
Comment Letter No. 6
Chris Berch, PE (Jurupa Community Services District)

Page 4 of 5 ends

2195
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 41
Comment Letter No. 6
Chris Berch, PE (Jurupa Community Services District)

Page 5 of 5 ends

2196
Eastvale 2040 General Plan Update
Page | 42 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2197
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 43
Response No. 6
Chris Berch, PE (Jurupa Community Services District)
December 26, 2023
6-1 This comment provides a general introduction to the Jurupa Community Services District (JCSD). Responses to specific comments are provided below. 6-2 The commenter expresses disappointment with a perceived lack of outreach and cooperation in development of the City of Eastvale’s 2040 General Plan. The City has exceeded all statutory requirements for outreach and consultation with JCSD, including mailing a Notice of Preparation (NOP) to the attention of Todd Corbin at 11201 Harrel St, Jurupa Valley, CA 91752 on August 5, 2022 and email correspondence to Chris Berch on April 18, 2023, April 20, 2023, May 2, 2023, and May 3, 2023. Additionally, a Notice of Availability (NOA) was mailed to JSCD on October 31, 2023 regarding the availability of the Draft EIR for a 45-day public review period. The City of Eastvale affirms that JCSD will continue to be included in the City’s public interest list for Eastvale 2040 and will be notified of any subsequent environmental documents and public hearings for the project. 6-3 The commenter requests the Eastvale 2040 General Plan also mention graffiti abatement in the scope of JSCD’s services within the City of Eastvale. This revision has been made in the “Public Agencies” section of the Eastvale 2040 General Plan Partnerships and Collaboration Element. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted. 6-4 The commenter notes a lack of specific references to maintaining a partnership with JCSD within the Eastvale 2040 General Plan, and asks that Eastvale 2040 General Plan Goal PC2 be revised to include partnership with JCSD for providing water/wastewater services, parks and recreation, frontage maintenance, and graffiti abatement services. A new policy has been incorporated into the “Public Agencies” section of the Eastvale 2040 General Plan Partnerships and Collaboration Element to address this request; refer to Eastvale 2040 General Plan Policy PC-2.9. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted. 6-5 The commenter requests that language in the Eastvale 2040 General Plan regarding the transition of park services responsibilities be removed. The transition of responsibility for public parks from JCSD and JARPD to the City is an aspirational goal contained in a longrange planning document. The City of Eastvale acknowledges that the current JCSD Board of Directors does not support transitioning responsibility for JCSD parks to the City at this time. This comment does not identify a specific concern with the adequacy of the Draft 2198
Eastvale 2040 General Plan Update
Page | 44 Final Environmental Impact Report
EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-6 The commenter requests that the Eastvale 2040 General Plan recognize new State legal requirements concerning non-functional turf, finalized in September 2022. The City is required to follow State law as well as the policies of JCSD regarding services; thus, it is not necessary to include a specific policy that requires compliance with law. The level of detail for irrigation requested in the letter is too specific for a broad policy document such as the draft General Plan. The City would welcome summary information on this issue for use at the planning counter for both residents and future developers. No changes to the “Waste/Wastewater/Storm” section of the Eastvale 2040 General Plan Open Space and Conservation Element have been incorporated in this regard. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-7 The commenter expresses appreciation for the inclusion of Goal S-6.4 in Volume II of the Eastvale 2040 General Plan, and requests that a reference to the State’s ban on irrigating non-functional turf for CII landscapes be included. Refer to Response 6-6. 6-8 This comment relates to future programming opportunities in the Citrus Policy Area. The City intends to consult with all stakeholders regarding this area, including JCSD. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-9 The commenter requests that Volume I of the Eastvale 2040 General Plan not refer to the “transition” of responsibility for parks and recreation services in the City of Eastvale. The City references “transition” as an aspirational goal. The City recognizes that JCSD does not currently support transitioning responsibility for its parks to the City. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-10 The commenter acknowledges that the Eastvale 2040 General Plan Open Space and Conservation Element incorrectly refers to the agency as “Jurupa Valley Community Services District,” rather than “Jurupa Community Services District.” This correction has been made throughout the Eastvale 2040 General Plan. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment 2199
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 45
specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-11 The commenter remarks that the Eastvale 2040 General Plan incorrectly states that all parks within the City of Eastvale are owned by JCSD. The Eastvale 2040 General Plan Open Space and Conservation Element has been revised to state JARPD owns and maintains public parks in the portion of Eastvale east of Hamner Avenue and in the neighboring City of Jurupa Valley. The commenter also disagrees with the statement in the Eastvale 2040 General Plan that it is anticipated park demand will exceed the level provided by JCSD.

This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-12 The commenter remarks that the number of parks that fall under their agency’s jurisdiction have been incorrectly stated in the Eastvale 2040 General Plan and offers a correction. The commenter notes that the Eastvale 2040 General Plan lists 13 parks, when the correct number is 15 parks, 23 playgrounds, a 35,000 square-foot community center, a 5,000 square-foot neighborhood center, three dog parks, and a 2.5 acre special event venue. The Embracing Eastvale’s Riverfront: Site Analysis section of the Eastvale 2040 General Plan Open Space and Conservation Element has been revised to address this comment. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
6-13 The commenter expresses discontent with the language used throughout the Eastvale 2040 General Plan regarding the scope of JCSD’s services and serves as a conclusion to the comment letter. The City of Eastvale is committed to working with JCSD and strives to maintain this fruitful partnership to serve the community. This comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA Therefore, no further response is warranted.
2200
Eastvale 2040 General Plan Update
Page | 46 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2201
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 47
Comment Letter No. 7
Chris Cortez (City of Chino)

Page 1 of 1 ends

2202
Eastvale 2040 General Plan Update
Page | 48 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2203
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 49
Response No. 7
Chris Cortez (City of Chino)
January 16, 2024
7-1 The commenter states that Table 4, Roadway Segment Operational Analysis, of Draft EIR Appendix D, Transportation Analysis, lists that Hellman Avenue from Northern Terminus to River Road has an existing Average Daily Traffic (ADT) of approximately 22,000 vehicles, but remarks that this number should be near 16,000 per Chino’s most recent ADT analysis from last year. The City reviewed the City of Chino’s comment regarding the 6,000 ADT difference between the City of Chino’s recent ADT analysis and Draft EIR Appendix D and have determined that changing the Hellman Avenue volume from 21,917 ADT to 16,000 ADT would not make a difference in the General Plan Update volume of 30,190 ADT and would not change the environmental conclusions of the Draft EIR. No changes are necessary nor required in this regard.

Additionally, the commenter states that circumstances potentially present during the data collection period could have inflated the new metric for Hellman Avenue, and requests this segment be analyzed further to confirm the findings in the Transportation Analysis. CEQA Guidelines Section 15125(a) provides that an EIR must include a description of the physical environmental conditions as they exist at the time the notice of preparation is published, or at the time environmental analysis is commenced. Such existing physical conditions will normally constitute the baseline physical conditions by which a lead agency determines whether an impact is significant; refer to CEQA Guidelines Section 15125(a). As noted in the Draft EIR, the City of Eastvale established the baseline date for the Draft EIR as August 5, 2022. The information included in Draft EIR Appendix D Table 4 was determined to be the best-supported and best available information at the time the report was prepared. As it has been determined that changing the Hellman Avenue volume from 21,917 ADT to 16,000 ADT would not change the environmental conclusions of the Draft EIR, no additional data collection is necessary nor required in this regard.
2204
Eastvale 2040 General Plan Update
Page | 50 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2205
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 51
Comment Letter No. 8
Jaqueline Vega (Riverside County Airport Land Use Commission)

Page 1 of 1 ends

2206
Eastvale 2040 General Plan Update
Page | 52 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2207
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 53
Response No. 8
Jaqueline Vega (Riverside County Airport Land Use Commission) January 2, 2024
8-1 The commenter represents the Riverside County Airport Land Use Commission (ALUC) and notes that the Agency will not have jurisdiction over the project if the Eastvale 2040 General Plan is outside of the Riverside County Boundary. As noted in Draft EIR Section

3.5, Hazards and Hazardous Materials, a portion of Eastvale (generally, the northwest portion of the City south of Bellegrave Avenue and east of Hellman Avenue) is within the Chino Airport Influence Area; refer to Draft EIR Exhibit 3.5-2, Airport Land Use Compatibility Zones. Portions of the Chino Airport Influence Area within the City limits are under the land use authority of the ALUC; refer to Draft EIR page 3.5-8.

As noted in Draft EIR Section 3.5, pursuant to proposed Eastvale 2040 General Plan Policies S-7.2 and S-7.3, future development activities occurring within the Planning Area and within an Airport Influence Area would require review by the ALUC during the development review process to ensure development compliance with Compatibility Zone criteria. This also requires future development within Compatibility Zones to be reviewed by the ALUC in accordance with the Basic Land Use Compatibility Criteria (ALUC Policy

3.1.1), for nonresidential development compatibility (ALUC Policy 3.1.4), for open land availability for emergency aircraft landing (ALUC Policy 4.2.4) and risk reduction through building design (ALUC Policy 4.2.6), and development clustering (LU Policy 15.9). As a result, the project is not anticipated to conflict with an adopted ALUCP. Therefore, impacts relative to airport safety hazards would be less than significant.

The City of Eastvale submitted an Application For Major Land Use Action Review to Riverside County ALUC on January 3, 2024 to determine the project’s consistency with the Chino Airport Compatibility Plan. As part of the application review process, it was determined that:
• With over 90% of the City built out, Eastvale has about 250 acres left of vacant and developable land. Nearly all lands within ALUC’s Compatibility Zone D are developed with large lot single family residential uses, with limited areas of supporting commercial retail and public services. These uses are considered new construction (i.e., developed within the last 20 years), and are not anticipated to be redeveloped during the Eastvale 2040 planning horizon. • At the intersection of Hellman Avenue and Chandler Street, there exists a large number of underutilized or vacant parcels that are presently designated by the existing General Plan as Low Density Residential (1.1-2 du/ac). Eastvale 2040 would amend these land uses from Low Density Residential 1.1-2 du/ac to 2208
Eastvale 2040 General Plan Update
Page | 54 Final Environmental Impact Report
Chandler Policy Area (CH-PA), which would permit a residential density of 8.1-20 du/ac, with a minimum project size of 2 acres. Non-residential uses would also be permitted in the CH-PA, with range up to 0.35 FAR, also with a 2-acre minimum size project.

The western boundary of the CH-PA is formed by lands owned by the Riverside, Orange, and San Bernardino County Flood Control District and is not available for development; however, open space and some urban agricultural use could be allowed.
• For the vacant and underutilized properties north of Walters Street that are designated as being within the Chandler Policy Area, and located within Zone D, the City of Eastvale added the following policy within the Land Use Element of the Eastvale 2040 General Plan to restrict density while ensuring consistency with the Chino Airport Compatibility Plan:

LU-3.12 Parcels north of Walters Street are within the Zone D of the Chino Airport Compatibility Plan and must have lot sizes no greater than

0.2 acres in size consistent with policy 2.3 of the Chino Airport Compatibility Plan.

The project’s Application For Major Land Use Action Review was approved by the Riverside County ALUC on February 8, 2024.
2209
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 55
Comment Letter No. 9
Miguel Vasquez, AICP (Riverside University Health System)

Page 1 of 2 ends

2210
Eastvale 2040 General Plan Update
Page | 56 Final Environmental Impact Report
Comment Letter No. 9
Miguel Vasquez, AICP (Riverside University Health System)

Page 2 of 2 ends

2211
Eastvale 2040 General Plan Update
Final Environmental Impact Report Page | 57
Response No. 9
Miguel Vasquez, AICP (Riverside University Health System) December 27, 2023
9-1 This comment provides a general introduction to the Riverside University Health System (RUHS). Responses to specific comments are provided below. 9-2 The commenter expresses appreciation that the language regarding public health in the Eastvale 2040 General Plan aligns with the mission and purpose of their agency. Since this comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted. (CEQA Guidelines Section 15088(a) requires that a lead agency only evaluate and respond to comments raised on environmental issues.) 9-3 The commenter requests further policy language and health metrics in areas of environmental justice, housing, active transportation, open space, and recreation be included in the Eastvale 2040 General Plan. The Eastvale 2040 General Plan Partnerships and Collaboration Element includes Goal PC-1 to protect and promote health and wellbeing for all residents. Several policies are identified for Goal PC-1 to provide for collaboration with many healthcare providers. For example, Policy PC-1.1 would foster the overall health and well-being of City residents, particularly the most vulnerable populations. Policy PC-1.2 promotes collaboration with local health care providers and educators to provide input on development design and solutions for public health issues.

The City of Eastvale looks forward to working all public health providers including RUHS.

Since this comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted.
9-4 This comment requests a meeting with the City of Eastvale prior to release of the next draft of the Eastvale 2040 General Plan and serves as a conclusion to the comment letter.

As requested, a meeting was arranged between the City of Eastvale and the RUHS on February 20, 2024. Since this comment does not identify a specific concern with the adequacy of the Draft EIR or raise an issue or comment specifically related to the Draft EIR’s environmental analysis under CEQA, no further response is warranted. 2212
Eastvale 2040 General Plan Update
Page | 58 Final Environmental Impact Report
THIS PAGE INTENTIONALLY LEFT BLANK.
2213
2214
Prepared by:

Michael Baker International, Inc.

March 2024
2215
Eastvale 2040 General Plan Update

CEQA FINDINGS OF FACT AND

STATEMENT OF OVERRIDING CONSIDERATIONS
(SCH #2022080090)
2216

THIS PAGE INTENTIONALLY LEFT BLANK
2217
CEQA Findings of Fact and Statement of Overriding
Considerations
Eastvale 2040 General Plan Update
State Clearinghouse (SCH) No. 2022080090

Lead Agency:

City of Eastvale, Planning Division
12363 Limonite Avenue, Suite 910
Eastvale, California 91752
Preparer:

Michael Baker International
3536 Concours Street, Suite 100
Ontario, California 91764
March 2024
2218

THIS PAGE INTENTIONALLY LEFT BLANK
2219
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | i

TABLE OF CONTENTS
I. INTRODUCTION ........................................................................................................................1 A. Record of Proceedings..................................................................................................................3 B. Custodian and Location of Records..............................................................................................4 II. PROJECT SUMMARY..................................................................................................................5 A. Project Overview ..........................................................................................................................5 B. Project Objectives.........................................................................................................................6 C. Project Components.....................................................................................................................6 D. Environmental Setting ................................................................................................................17 E. Planning Context/Project Background .......................................................................................17 F. Required Approvals....................................................................................................................19 III. ENVIRONMENTAL REVIEW AND PUBLIC PARTICIPATION ..........................................................20 IV. FINDINGS REQUIRED UNDER CEQA..........................................................................................22 A. Legal Effects of Findings .............................................................................................................23 V. FINDINGS REGARDING SIGNIFICANT IMPACTS .........................................................................24 A. Impacts Not Fully Mitigated to a Level of Less than Significant.................................................24 B. Growth-Inducing Impacts...........................................................................................................43 C. Significant and Irreversible Environmental Changes..................................................................46 D. Alternatives.................................................................................................................................47 VI. STATEMENT OF OVERRIDING CONSIDERATIONS ......................................................................56 A. Social Benefits.............................................................................................................................59 B. Economic Benefits......................................................................................................................60 C. Environmental Benefits..............................................................................................................60 VII. CONCLUSION ..........................................................................................................................62

LIST OF TABLES
Table 1: Eastvale 2040 General Plan Development Potential ....................................................................16 2220
Eastvale 2040 General Plan Update
Page | ii CEQA Findings of Fact and Statement of Overriding Considerations

THIS PAGE INTENTIONALLY LEFT BLANK
2221
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 1 I. INTRODUCTION
The California Environmental Quality Act (CEQA) (Pub. Res. Code §§ 21000, et seq.) and the CEQA Guidelines (14 Cal. Code Regs §§15000, et seq.) promulgated thereunder, require that the environmental impacts of a project be examined before a project is approved. In addition, once significant impacts have been identified, CEQA and the CEQA Guidelines require that certain findings be made before project approval. Specifically, regarding findings, CEQA Guidelines Section 15091 provides:
(a) No public agency shall approve or carry out a project for which an Environmental Impact Report (EIR) has been certified which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding. The possible findings are:

1. Changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR.

2. Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency.

3. Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR. (b) The findings required by subdivision (a) shall be supported by substantial evidence in the record.
(c) The finding in subdivision (a)(2) shall not be made if the agency making the finding has concurrent jurisdiction with another agency to deal with identified feasible mitigation measures or alternatives. The finding in subdivision (a)(3) shall describe the specific reasons for rejecting identified mitigation measures and project alternatives. (d) When making the findings required in subdivision (a)(1), the agency shall also adopt a program for reporting on or monitoring the changes which it has either required in the project or made a condition of approval to avoid or substantially lessen significant environmental effects.

These measures must be fully enforceable through permit conditions, agreements, or other measures.
(e) The public agency shall specify the location and custodian of the documents or other materials which constitute the record of the proceedings upon which its decision is based. (f) A statement made pursuant to Section 15093 does not substitute for the findings required by this section.
2222
Eastvale 2040 General Plan Update
Page | 2 CEQA Findings of Fact and Statement of Overriding Considerations The “changes or alterations” referred to in Section 15091(a)(1) above, that are required in, or incorporated into, the project which mitigate or avoid the significant environmental effects of the project, may include a wide variety of measures or actions as set forth in CEQA Guidelines Section 15370, including:
(a) Avoiding the impact altogether by not taking a certain action or parts of an action. (b) Minimizing impacts by limiting the degree or magnitude of the action and its implementation. (c) Rectifying the impact by repairing, rehabilitating, or restoring the impacted environment. (d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action.
(e) Compensating for the impact by replacing or providing substitute resources or environments, including through permanent protection of such resources in the form of conservation easements.

Should significant and unavoidable impacts remain after changes or alterations are applied to the project, a Statement of Overriding Considerations must be prepared. The statement provides the lead agency’s views on the ultimate balancing of the merits of approving a project despite its environmental damage. Regarding a Statement of Overriding Considerations, CEQA Guidelines Section 15093 provides:
(a) CEQA requires the decision-making agency to balance, as applicable, the economic, legal, social, technological, or other benefits, including region-wide or statewide environmental benefits, of a proposed project against its unavoidable environmental risks when determining whether to approve the project. If the specific economic, legal, social, technological, or other benefits, including region-wide or statewide environmental benefits, of a proposed project outweigh the unavoidable adverse environmental effects, the adverse environmental effects may be considered “acceptable.”
(b) When the lead agency approves a project which will result in the occurrence of significant effects which are identified in the final EIR but are not avoided or substantially lessened, the agency shall state in writing the specific reasons to support its action based on the final EIR and/or other information in the record. The Statement of Overriding Considerations shall be supported by substantial evidence in the record.
(c) If an agency makes a Statement of Overriding Considerations, the statement should be included in the record of the project approval and should be mentioned in the notice of determination. This statement does not substitute for, and shall be in addition to, findings required pursuant to Section 15091.

The following Findings of Fact (Findings) are the findings that are required to be made by the decision-making body prior to carrying out or approving the proposed project. 2223
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 3 Having received, reviewed, and certified the Final EIR for the Eastvale 2040 General Plan Update (proposed project), State Clearinghouse (SCH) No. 2022080090, as well as all other information in the Record of Proceedings (as defined below) on this matter, the following Findings are hereby adopted by the City of Eastvale (City) in its capacity as the CEQA Lead Agency. These Findings set forth the environmental basis for current and subsequent discretionary actions to be undertaken by the City and responsible agencies in implementing the project.

A. Record of Proceedings
For purposes of CEQA and these Findings, the Record of Proceedings for the proposed project includes but is not limited to the following documents and other evidence:
• The Notice of Preparation (NOP) and all other public notices issued by the City in conjunction with the proposed project;
• Written comments received on the NOP;
• Scoping Meeting(s) and written comments received at Scoping Meeting(s); • The Draft Environmental Impact Report (Draft EIR) and technical appendices for the proposed project;
• All written comments submitted by agencies or members of the public the Draft EIR and Final EIR;
• All responses prepared by the City to written comments submitted by agencies or members of the public on the Draft EIR and Final EIR;
• All written and verbal public testimony presented during a noticed public hearing for the proposed project at which such testimony was taken;
• The reports and technical memoranda included or referenced in the responses to public comments;
• All documents, studies, EIRs, or other materials incorporated by reference or cited to in the Draft EIR and the Final EIR;
• The Final EIR and all supplemental documents prepared for the Final EIR and submitted to the City of Eastvale Council prior to the Council hearing; • Matters of common knowledge to the City, including but not limited to federal, State, and local laws, ordinances, plans and regulations;
• Any documents expressly cited in these Findings;
• City staff report(s) prepared for the hearing(s) related to the proposed project and any exhibits thereto;
• Draft and Final Eastvale 2040 General Plan; and
2224
Eastvale 2040 General Plan Update
Page | 4 CEQA Findings of Fact and Statement of Overriding Considerations • Any other relevant materials required to be in the record of proceedings by CEQA pursuant to Public Resources Code section 21167.6(e).

The Draft EIR and related technical studies were made available for review during the public review period on the City’s website at https://www.eastvaleca.gov/our-city/what-snew/eastvale-2040. A copy of the documents was also made available at the City of Eastvale City Hall, Community Development Department, Planning Division, 12363 Limonite Ave, Suite 910, Eastvale, California 91752.

B. Custodian and Location of Records
The City of Eastvale is the custodian of records. The documents and other materials, which constitute the administrative record for the City’s actions related to the project, as detailed in Section I.A. above, are located at 12363 Limonite Avenue, Suite 910, Eastvale, California 91752.

Copies of these documents, which constitute the Record of Proceedings, at all relevant and required times, have been and will be available upon request at the City’s Community Development Department, Planning Division. This information is provided in compliance with Public Resources Code Section 21081.6(a)(2) and CEQA Guidelines Section 15091(e). 2225
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 5 II. PROJECT SUMMARY
A. Project Overview
California State law requires each city and county to adopt a comprehensive, long-term General Plan. The General Plan is the official policy statement of the City for use by the Council to guide private and public development in the City, as well as the City’s own operations and decisions.

State law requires that the City’s ordinances regulating land use be consistent with the General Plan. The Zoning Code, individual project proposals, and other related plans and City ordinances must be consistent with the goals and policies in this General Plan.

The General Plan projects conditions and needs into the future as a basis for determining longterm objectives and policies and shorter-term decision making, budgeting and prioritization of implementation programs. The General Plan is considered “long-term” since it looks 20 years or further into the future. The City’s current General Plan was adopted in 2012. As such, the City is undertaking the development of a new General Plan known as Eastvale 2040 to help guide future development and plan for future needs for services in the City.

The Eastvale 2040 General Plan updates all the State-required General Plan elements, including Land Use, Circulation, Housing, Conservation, Open Space, Noise, and Safety. The Eastvale 2040 General Plan also addresses urban design, environmental justice, economic development, public health, and sustainability. As a matter of information, on June 21, 2022, the State Department of Housing Community and Development found the Eastvale 2021-2029 Housing Element update consistent with State law; thus, no changes are proposed to the Housing Element.

Major components of the Eastvale 2040 General Plan include:
• Update existing conditions, with year 2022 serving as the baseline year. • Update the General Plan development projections to the year 2040, the Eastvale 2040 planning period.
• Reorganization of the State-mandated General Plan elements into the following Eastvale 2040 General Plan subsections:
o Partnerships and Collaboration
o Built Environment
o Nature and Conservation
o Implementation
• Update the Land Use Element and Land Use Map with new land use designations and policy areas.
• Update existing General Plan Elements to reflect current conditions and new development projections.
2226
Eastvale 2040 General Plan Update
Page | 6 CEQA Findings of Fact and Statement of Overriding Considerations • Add, delete, or modify existing General Plan Element goals and policies.

B. Project Objectives
California Environmental Quality Act (CEQA) Guidelines Section 15124(b) requires a project description to contain a statement of objectives that includes the underlying purpose of the proposed project. The intended objectives of the Eastvale 2040 General Plan Update are identified below. The underlying purpose of the project is to update the City’s General Plan in conformance with California State law and ultimately adopt a comprehensive, long term General Plan as the official policy statement of the City for use by the City Council to guide private and public development, as well as the City’s own operations and decisions. The General Plan projects conditions and needs into the future as a basis for determining long term objectives and policies and shorter-term decision making, budgeting, and prioritization of implementation programs. • Direct future growth in designated focus areas in a manner which preserves existing neighborhoods, enhances quality of life, and maintains a balance of land uses which benefits residents and businesses;
• Preserve Eastvale’s suburban character and promote development that embraces the City’s diversity, history, and sense of community;
• Enhance and activate public/quasi-public land uses, including resources unique to the City of Eastvale such as the Santa Ana Riverfront;
• Create a sustainable multi-modal transportation network that includes walkable, bicycle friendly environments;
• Increase residential development potential to meet regional housing needs; • Promote a variety of housing choices to achieve the City’s 6th Cycle Regional Housing Needs Assessment housing goals; and
• Implement new California State law General Plan requirements.

C. Project Components
The General Plan projects conditions and needs into the future as a basis for determining longterm objectives and policies and shorter-term decision making, budgeting and prioritization of implementation programs. The General Plan is considered “long-term” since it looks 20 years or further into the future. The City’s current General Plan was adopted in 2012. As such, the City is undertaking the development of a new General Plan known as Eastvale 2040 to help guide future development and plan for future needs for services in the City.

As stated, the Eastvale 2040 General Plan will update all the State-required General Plan elements, including Land Use, Circulation, Housing, Conservation, Open Space, Noise, and Safety.

The Eastvale 2040 General Plan also addresses urban design, environmental justice, economic development, public health, and sustainability. As a matter of information, on June 21, 2022, the 2227
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 7 State Department of Housing Community and Development found the Eastvale 2021-2029 Housing Element update consistent with State law; thus, no changes are proposed to the Housing Element.

GENERAL PLAN UPDATE ELEMENTS
The Eastvale 2040 General Plan takes the State-mandated general plan requirements and divides them into the following major sections:
• Partnerships and Collaboration. Recognition that Eastvale must partner with community and business groups, faith-based organizations, and local and regional agencies to achieve its vision. This section starts the environmental justice discussion, an important theme of the Eastvale 2040 General Plan that carries through each section. • Built Environment. As the City is largely developed, this section introduces the land use and housing element requirements of State law and introduces focus areas that are expected to be the area of growth for the next 20 years and means of protection of established neighborhoods. The built environment also addresses the mobility element recognizing the role of the automobile in Eastvale, while developing other mobility options.
• Nature and Conservation. While most of the City is suburban in design, opportunities exist to connect to the Santa Ana River and extend the connections throughout the City. This section includes the required open space, conservation, safety, and noise elements.

Eastvale has a fantastic opportunity for trails, interpretive centers, rewilding parts of the Santa Ana River, and developing a “grand” park. Connecting the City to the river is an exciting goal of the Eastvale 2040 General Plan.
• Implementation. Realizing the vision of the Eastvale 2040 General Plan will require actions ranging from changes to Municipal Code, to partnering with other agencies. The implementation section is not an exhaustive “to-do” list for implementing the Eastvale 2040 General Plan, but rather a means of prioritizing efforts needed to realize the vision.

Each Eastvale 2040 Element has a specific purpose and focus, as described below. Together, they present a consistent policy platform, as required by law. No single element or subject supersedes any other, and all are internally consistent.

Housing Element
The Housing Element presents the City of Eastvale’s goals, quantified objectives, and policies relative to the development, improvement, and maintenance of housing within the incorporated areas of the City, during the period of 2021 to 2029. The Housing Element’s goals, objectives, policies, and programs aim to ensure that the housing inventory of Eastvale is available, adequate, and affordable. A summary of the element is included in the Eastvale 2040 General Plan, while the entire 2021-2029 Housing Element is included in Volume 2 of the General Plan. 2228
Eastvale 2040 General Plan Update
Page | 8 CEQA Findings of Fact and Statement of Overriding Considerations Land Use Element
The purpose of the Land Use Element is to provide a long-range guide for the physical development of the City, reflecting the community’s vision for a high quality of life through the built environment. This chapter identifies the range of allowed land uses in the City and designates where they are to be located. Land is finite and a valuable resource – its use dictates the City’s economic and fiscal future, which in turn results in City amenities and services that are provided to residents.

The Land Use Element, and in particular the Land Use Map, describe both the type of development the community expects over time and where that development should occur.

Different uses of the land such as housing, offices, or stores are assigned standards such as housing units per acre, or a ratio of floor square footage to parcel size, so that the approximate size and extent of future development can be predicted. While not all of the standards are absolute, the descriptions in this element can be used to determine the number of new people and jobs expected in the next planning horizon. These estimates are then used to determine what services are needed.

Much of Eastvale is fully developed and is not expected to change significantly over the planning horizon. Established residential neighborhoods will remain as they exist today. However, there are three main areas of the City that are yet to develop: Downtown Eastvale, Chandler Area, and Riverfront. These areas each offer an opportunity to bring unique and creative land uses that will usher Eastvale into the next phase of its history.

Land Use Plan
The Eastvale 2040 General Plan Land Use Map identifies the type, location, and density/intensity of future development within the City; refer to Draft EIR Exhibit 2.0-4, Proposed Land Use Plan.

The proposed land use plan assigns all land in the City of Eastvale to one of 14 land use designations that are organized into four place types as described below.

Neighborhood
The Neighborhood place types represent the neighborhoods of Eastvale. Residential uses comprise most of the City. Each residential place type designation includes a range of allowable densities, calculated as the number of dwelling units allowed per net acres (units/acre). The maximum density represents a potential maximum number of residential units that could be achieved based on the provisions of both the General Plan and Zoning Code. Each residential place type also includes a minimum density.

Residential - Very Low (R-VL)
The intent of this designation is to respect the existing residential homes on larger lots. In addition to single-family homes, this designation also allows for the keeping of animals and limited agriculture. Preferred uses and development standards include:
2229
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 9 • Single-family housing less than 4 units/acre
• Keeping of animals and limited agriculture
• Parks, trails, and other compatible public uses
• Buildings limited to two stories in height
Residential - Low (R-L)
This designation encompasses the more traditional detached and attached single-family homes, but also allows for other forms of single-family up to eight (8) units per acre, including cluster homes, patio homes, and other single-family detached and attached configurations. Townhomes are also allowed in this category up to 8 units per acre. Preferred uses and development standards include:
• Detached and attached single-family housing from 4.1 to 8 units/acre • Parks, trails, schools, and other compatible public uses • Buildings limited to two stories in height
Residential - Moderate (R-M)
This designation provides for single-family detached and attached housing, including small-lot single- family homes, duplexes, triplexes, cluster homes, patio homes, townhomes, and other detached and attached configurations. Also provides for multifamily housing including courtyard housing, and stacked flats up to 20 units per acre. Preferred uses and development standards include:
• Single-family and multi-family homes from 8.1 to 20 units/acre • Parks, trails, schools, and other compatible public uses • Buildings limited to three stories in height
Residential – High (R-H)
The intent of this designation is to allow for a range of multi-family housing types (either for-sale or for-rent) including motor-courts, green-courts, stacked flats, and other configurations up to 40 units per acre. It is suitable as a buffer use between less intense neighborhoods and commercial areas. This housing designation is only allowed within two of the of the Policy Areas – the Downtown West and Downtown East Policy Areas. Site design and building design should contribute to walkable streets by incorporating pedestrian-oriented building frontages. Preferred uses and development standards include:
• Multi-family residential from 20.1 to 40 units/acre
• Usable common and private open space
2230
Eastvale 2040 General Plan Update
Page | 10 CEQA Findings of Fact and Statement of Overriding Considerations • Internal and external pedestrian connectivity to provide convenient access to the street and adjacent uses
• Parks, trails, schools, daycare, and other compatible public uses • Buildings limited to six stories in height
Employment
The land use place types that constitute the employment uses include commercial retail centers, industrial areas, and office uses. Development intensity for non-residential areas is defined by Floor Area Ratio (FAR), which isthe ratio of total grossfloor area of all buildings on a lot compared to the total area of that lot. Higher FARs generally indicate larger buildings and/or more stories.

The driver in determining FAR is the amount of parking that is required and how that parking requirement is satisfied (either surface parking, in a structure, or underground). Each of the employment place types are defined below.

Commercial Retail (CR)The Commercial Retail designation provides for highly visible and accessible retail, services and dining opportunities along arterial corridors that serve the needs of residents locally and in surrounding communities. These centers also support nearby businesses and employees. Typical uses also include public uses (e.g., City Hall), cultural and entertainment uses, professional offices, and hospitality services.

Development standards include:
• Development intensity or FAR of 0.25 – 0.50
• Maximum height of 50 feet, with certain exemptions per the Zoning Code • Design for internal walkability between uses and for easy pedestrian access from surrounding residential neighborhoods
Industrial Flex (IF)
The Industrial Flex designation providesfor light or limited industrial and manufacturing activities where operations are typically enclosed in a structure and limited exterior storage or operations are fully screened from public view. Exceptions would include commercial nursery or agricultural operations. This designation is also suitable for employee-intensive uses, such as corporate offices, research and development, and technology centers with supporting retail uses. It also provides a suitable location for start-up businesses, recreational businesses, and “maker” spaces for breweries, arts & crafts, clothing, food, and similar small-scale industries. Adaptive re-use of older industrial buildings to accommodate the broader mix of uses allowed is encouraged.

Development standards include:
• Development intensity or FAR from 0.25 – 0.60
• Maximum height of 40 feet
2231
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 11 Business – Professional (B-P)
The Business-Professional designation provides for employee-intensive uses, including research and development, technology centers, medical facilities, corporate and professional office uses, “clean” industry, and supporting retail uses. This place type also provides a suitable location for innovative start-up businesses and creative design offices in the arts, engineering, media, among others. Maker spaces for breweries, arts and crafts, clothing, food, and similar small-scale industries are also allowed.

Development standards include:
• Development intensity or FAR from 0.25 – 0.60
• Maximum height of 75 feet
Open Space
The land use place types that constitute the Open Space category apply to land and water areas that are generally undeveloped or developed with very low intensity uses. Depending on their function, the open space place types may be used for passive or active recreation, conservation, or flood control.

Water (W)
The Water designation applies to natural, man-made, and altered water courses, including the Santa Ana River, stream channels, and flood control facilities. The purpose is to designate the location of a water course and ensure that special policies associated with surrounding open space or habitat protection are considered. There is no development allowed within the Water designation, other than flood control facilities as deemed necessary by the governing agency.

Open Space – Recreation (OS-R)
The Open Space – Recreation designation is intended to provide for and preserve publicly owned land for passive and active recreational uses including parks, trails, and athletic fields. In addition to the neighborhood parks in Eastvale, it has also been applied to the electric utility easement on the north end of the City where trails and landscaping are allowed with the approval of the utility company. This designation may also be applied to private outdoor recreation facilities. Land within the Open Space – Recreation designation can be subject to occasional flooding.

Riverfront Policy Area (RF-PA)
The Riverfront Policy Area provides for the conservation of natural resource areas including watersheds, habitat areas and corridors, and areas within flood zones. It also aimsto activate the entire interface of the Santa River with various recreational uses to take full advantage of this unique natural asset. This category has been applied to the Santa Ana River watershed, associated habitat areas, and parcels prone to flooding and owned by the Flood Control District.

Potential uses within the Riverfront Policy Area include athletic fields, trails, and other types of 2232
Eastvale 2040 General Plan Update
Page | 12 CEQA Findings of Fact and Statement of Overriding Considerations recreation uses subject to the approval of the Flood Control District. In addition, agriculture may be an appropriate use, if allowed, on flood control land along Hellman Avenue.

Unique
The land use place types within the Unique category encompass four policy areas where there are opportunities for new development to take place over time. Two of the policy areas are currently vacant (Downtown West and Citrus), while the other two have the potential to transition with infill development (Downtown East and Chandler Area). Each policy area requires additional study – either through a future Specific Plan or similar planning/regulatory tool.

Following is a discussion of the General Plan guidance for the focus areas. The guidance includes the mix of land uses envisioned, maximum density and intensity standards, and design direction.

Downtown West Policy Area
The Downtown West Policy Area is part of a 153.1-acre area along Limonite that is envisioned as the center piece of Eastvale’s future downtown, encompassing the Leal Master Plan (LMP). The property, located at the northwest intersection of Limonite Avenue and Hamner Avenue is intended to provide for a range of housing, retail, restaurants, hospitality, entertainment, and civic uses in a walkable urban environment. The property may also be suitable for a satellite college or university campus, or medical related uses. A range of housing types between 20.1 and 40 dwelling units per acre is allowed, in compliance with the certified 2021-2029 Housing Element update. The certified Housing Element allows 660 units at a density of 26.4 to 40 dwelling units per acre (du/ac), 730 units at a density of 22 to 40 du/ac, and 1,110 units at a density of 14 to 21 du/ac. To better accommodate density and proposed multiple-family projects in the LMP, Eastvale 2040 would shift 40 units from the 14 to 21 du/ac range to the 26.4 to 40 du/ac range, for a total of 700 units in this range. The overall maximum of 2,500 total units of the Downtown West Policy Area and LMP would remain unchanged. Non-residential uses can range from 0.25 to 1.5 FAR.

At the heart of Downtown West is a 16.5-acre area at the corner of Limonite and Hamner Avenues. In May 2022, the City Council approved a Development Agreement between The New Home Company and the City to designate the 16.5-acre area under an option agreement for development of a city hall building, outdoor amphitheater and civic park area, police station, library, hotel, office uses, and a variety of restaurants and retail uses totaling 495,000 square feet. Detailed planning and development of the entire Downtown West Policy Area is guided by the adopted Leal Master Plan.

Downtown East Policy Area
The Downtown East Policy area is located across Hamner Avenue to the east of the Downtown West Policy Area and includes three existing shopping centers including the Cloverdale shopping center, Eastvale Gateway North shopping center, and Eastvale Gateway South shopping center. 2233
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 13 This community commercial center has an abundance of parking that could accommodate new residential development. The intent is to allow for a transition to an integrated, walkable, mixeduse environment for commercial retail and services, entertainment, and residential uses, along with a variety of public open space amenities.

Looking south across Limonite Avenue, is a vacant, 20-acre parcel of land that is at the main entrance to the City from I-15. This important site is proximate to shopping, entertainment, and services, as well as transit. The area is intended to become a mix of low-moderate housing up to 40 dwelling units per acre on the southern half of the parcel, with commercial and office uses on the northern half of the site up to 1.5 FAR.

While a specific plan may be considered for the Downtown East Policy area, the Eastvale 2040 General Plan already provides for the ability of these sites to develop with mixed-use. Because of these sites being located near I-15, it is likely that design considerations will be needed to protect against noise and diesel emissions associated with the Interstate.

Chandler Policy Area
The Chandler Policy Area, named for the roadway that forms its southern boundary, is one of two areas of Eastvale that provided housing for dairy workers until the late 1990s when many of the dairies began relocating outside of Eastvale. The Chandler Policy Area contains a mix of land usesthat reflect the community’s agricultural heritage, including homes on large lots, agriculturerelated businesses, horse corrals, barns, and farm animals. The western boundary of this area is formed by land owned by the Orange County Flood Control District (OCFCD) and is not available for development; however, open space and some urban agricultural use could be allowed. The OCFCD is the lead agency appointed by the U.S. Army Corps of Engineers to manage the improvements at Prado Dam and its effect on communities upstream from the dam.

The Chandler Policy Area encourages a broader mix of low intensity uses, that are compatible with the rural character of the area. The businesses could have housing or offices above them in the same building, or in a separate building nearby. Toward the west where the flooding restricts development potential, agricultural businesses that could farm the land are encouraged. The area is envisioned to allow maker spaces for incubator businesses, artisans, and craft restaurants and breweries. The open space nearby could also be used for festivals and gatherings celebrating the community’s diversity. An important aspect of development in the Chandler Area will be to respect and support the continuation of the existing agricultural and residential uses. A specific plan will be required to guide how new residential and non-residential development can occur sensitively and in a way that creates a unique place in the City. New residential will be allowed up to 20 dwelling units per acre, with a minimum project size of 2 acres. Non-residential uses can range up to 0.35 FAR, also with a 2-acre minimum size project. 2234
Eastvale 2040 General Plan Update
Page | 14 CEQA Findings of Fact and Statement of Overriding Considerations Citrus Policy Area
The Citrus Policy Area serves as one anchor to the improved Santa Ana River trail and adjacent recreation amenities. A goal of the Eastvale 2040 General Plan is to enhance the river with more trails, recreational opportunity, and rewilding. While some of the Citrus Policy Area will accommodate senior housing, most of this area is in the floodplain and unlikely to have more than recreational uses. Working with Jurupa Community Services District (JCSD), the plan is to expand recreational activities, river access, and improve the quality of the riparian area along the Santa Ana River. As a focal point for the river, the Citrus Policy Area will serve as a trail hub, informational site, and be truly integrated into the Santa Ana River Trail. This Policy Area also includes approximately 20 acres of land owned by the City and should support and be integrated with the recreation and community-serving uses in this area. Visitor-serving uses, including a hotel, could be accommodated in this area. The Citrus Policy Area on the east will balance the ‘grand park’ proposed in the west along Hellman Avenue. The Santa Ana River will connect the two, as will existing and new trails and pathways through the City.

Noise Element
The Noise Element guides the location of future planned noise-sensitive land uses and considers noise exposure when placing facilities that generate significant volumes of noise. For purposes of the Noise Element, "noise-sensitive areas and uses" include residential areas, parks, schools, places of worship, churches, hospitals, and long-term care facilities. It is also important that noise generating uses from industry and commerce be protected from incompatible noise sensitive uses.

Specific topics addressed in the Noise Element include:
• Noise Environment and Measurements;
• Transportation Noise Sources;
• Fixed Noise Sources; and
• Vibration
Open Space and Conservation Element
The amount and quality of open space defines the character of a community. The City enjoys many parks, and roughly four miles of frontage along the Santa Ana River. The continued stewardship of these resources is important to maintaining the quality of life in Eastvale as the City grows. This chapter of the Eastvale 2040 General Plan sets goals and direction for both open space and conservation of natural resources. Conservation also includes stewardship air and water, and the other essential elements to life. This chapter includes high level policies that address these issues and ensure that land use decisions are made with the environment of Eastvale in mind.
2235
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 15 Partnerships and Collaboration Element
Eastvale is surrounded by four other cities and is situated at the western edge of Riverside County, bordered by San Bernardino County. Success for Eastvale needs the partnership and collaboration of others. Examples include the partnership with Western Riverside Council of Governments (WRCOG) for regional transportation planning, Orange County Flood Control for use of land that will someday become the “grand park,” the Santa Ana River Conservancy that will help Eastvale activate the riverfront, and Jurupa Community Services District (JCSD) and Jurupa Area Recreation and Park District (JARPD) that currently operate parks and recreation services within the City. This chapter includes policies that continue longstanding collaboration and open the door for new partnerships.

Safety Element
The Safety Element is a State-mandated General Plan element that must identify potential natural and human-created hazards that could affect the City’s residents, businesses, and services. The purpose of the Safety Element is to establish a framework that anticipates these hazards and prepares the community to minimize exposure to them.

Mobility Element
The purpose of the Mobility Element isto provide a long-range guide for providing transportation options that support the community’s vision for a sustainable, healthy community. This chapter identifies the range of transportation options that include walking, bicycling, micro-mobility, driving and riding transit. Creating a network of integrated roads, trails, sidewalks, and bicycle facilities is essential to reducing emissions and improving air quality, creating safe and healthy streets, and connecting the community to activity centers and resources.

GENERAL PLAN UPDATE GROWTH AND ASSUMPTIONS
The projected future development intensity and density identified in Table 1, Eastvale 2040 General Plan Development Potential, is based upon existing and historical development, as well as reasonably anticipated development.

Table 1 summarizes the net growth anticipated by the proposed project. As indicated, the anticipated growth over existing (2022) conditions is 4,173 additional dwelling units and 6,999,959 additional square feet of non-residential uses based upon historical development patterns in the City and the reasonably assumed development intensities and densities identified in Table 1. This would result in a population increase of 16,358 persons through 2040.

As previously stated, no changes are proposed to the Housing Element, as it has recently been updated. The proposed Land Use Plan would not impact the City’s housing opportunity sites. The growth assumptions under the General Plan Update account for the potential development of housing to accommodate the City’s RHNA requirements and recently adopted Housing Element. 2236
Eastvale 2040 General Plan Update
Page | 16 CEQA Findings of Fact and Statement of Overriding Considerations Table 1: Eastvale 2040 General Plan Development Potential Land Use
Land
Use
Code
Maximum Assumed Vacant
Acres
Estimated
Dwelling Units
Estimated
Non-Residential
Square Feet
Population
Gain DU/Acre FAR DU/Acre FAR
Neighborhood
Single Family - Very Low SF-VL < 4 -- 2 -- 0.0 0 -- 0
Single Family - Low SF-L 4.0-8.0 -- 5 -- 90.4 452 -- 1,771 Single Family - Moderate SF-M 8.1-20 -- 15 -- 20.9 314 -- 1,232 Multi Family - Low-Moderate MF-LM 20.1-40 -- 25 -- 0.0 0 -- 0 Employment
Commercial Retail CR -- 0.25-0.5 -- 0.5 79.4 -- 1,728,284 -- Industrial Flex IF -- 0.25-0.6 -- 0.6 56.8 -- 1,483,536 -- Business - Professional B-P -- 0.25-0.6 -- 0.6 73.5 -- 1,921,889 -- Open Space
Water W -- -- -- -- 275.7 -- -- --
Open Space - Recreational OS-R -- -- -- -- 40.4 -- -- -- Riverfront Policy Area RF-PA -- -- -- -- 1,231.1 -- -- -- Unique
Downtown West Policy Area DW-PA -- 0.25-1.5 -- 1.5 153.1 2,500 495,000 9,800 Chandler Policy Area CH-PA 8.1-20 0-0.35 20 0.35 39.4 332 180,050 1,301 Downtown East Policy Area DE-PA 20.1-40 0.25-1.5 40 1.5 19.7 496 963,438 1,944 Citrus Policy Area CS-PA 8.1-20 0-0.35 20 0.35 24.9 79 227,762 310 Right-Of-Way ROW -- -- -- -- 70.9 -- -- --
Totals 2,176.1 4,173 6,999,959 16,358
DU/Acre = dwelling units per acre FAR = floor area ratio 2237
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 17 D. Environmental Setting

REGIONAL SETTING
Eastvale is located in the Inland Empire in northwestern Riverside County, California. The City is approximately 13 square miles in size and its boundaries extend from Hellman Avenue to the west (the San Bernardino county line), Philadelphia Avenue to the north (also the San Bernardino county line), the Santa Ana River and the City of Norco to the south, and Interstate 15 (I-15) to the east. This “planning area” or “project area” includes all land within the City limits. Interstate and regional access to the City is provided by I-15, which runs in a north-south direction along the City’s eastern boundary, and State Route 60 (SR-60), which bisects the City’s northern limits in an east-west direction.

LOCAL SETTING
The City of Eastvale was primarily developed with single-family residential homes and commercial shopping centers before its incorporation in 2010. As of today, it is estimated that over 90 percent of the City’s available lands have already been built, leaving little opportunity for significant new development. Existing on-the-ground development within the City includes 18,396 residential dwelling units and approximately 15,779,566 square feet (362.25 acres) of non-residential uses.

Eastvale is generally highly developed, limited natural open space is offered by the City. The most prominent natural resource within the City is the Santa Ana River and surrounding riparian and woodland habitat. The Santa Ana River forms the southern boundary of Eastvale and is an important local and regional open space resource. The majority of the City is characterized by developed/disturbed land and agricultural land; however, limited sensitive vegetation communities do occur and include grassland, meadows and marshes, and riparian scrub/woodland/forests.

E. Planning Context/Project Background
The current City of Eastvale General Plan (2012 General Plan) was adopted on June 13, 2012 and consists of the following State-mandated and optional elements:
• Land Use • Housing
• Circulation and Infrastructure • Noise
• Design • Parks, Recreation, and Open Space
• Economic Development • Safety
• Air Quality and Conservation • Sustainability
• Healthy Communities
2238
Eastvale 2040 General Plan Update
Page | 18 CEQA Findings of Fact and Statement of Overriding Considerations The Housing Element was last updated in April 2022 in compliance with the State-mandated 6th Cycle 2021-2029 Regional Housing Needs Allocation (RHNA) for cities within the Southern California Association of Governments (SCAG) region. No changes are proposed to the Housing Element with implementation of the proposed project; however, the zone changes proposed by the updated Housing Element are addressed in the EIR.

According to the 2012 General Plan, General Plan buildout was anticipated to result in the development of 17,720 dwelling units, resulting in a population of 61,698 within the planning area. The 2012 General Plan did not expect growth for the City’s commercial land uses, which constituted approximately three percent of the City, or office land uses and industrial land uses, which constituted approximately five and eight percent of the City, respectively. Since its adoption over 10 years ago, the City has changed and evolved. As a result, a strategic update to the 2012 General Plan is warranted to address outdated information, projections, and policy direction.

The Eastvale 2040 General Plan (proposed project) was developed through a process involving community engagement activities, working sessions with City staff, and meetings with various stakeholder groups. To draft the Eastvale 2040 General Plan, a public engagement program solicited input from community members on their vision for the future. Over the past two years, several outreach methods were used, including:
• Community Champion Stakeholder Interviews, which gathered feedback from a diverse set of City of Eastvale community champions;
• Eastvale 2040 General Plan Clear Vision Speaker Series, a series of presentations by experts in the fields of urban planning, community design, community diversity, and economic strategy;
• Explore Eastvale, which invited community members to assess segments of the City’s streets using an online survey tool;
• Engage Eastvale, the City’s online engagement platform which hosted a number of surveys and forms for community members to provide feedback; • Community Visioning Workshop, a public workshop designed to reintroduce community members to the Eastvale 2040 General Plan and allow them to provide input on certain focus topics of the General Plan;
• Advisory Circles, four stakeholder meetings held to deliberate on the focus topics of land use, circulation, the Chandler area, as well as open space and conservation; • Planning Commission and City Council Workshops, which gathered feedback from the City’s appointed and elected officials;
2239
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 19 • Pop-ups, at local events to provide community members with an impromptu opportunity to provide input on the future of Eastvale; and
• General Plan Open House, a “drop-in” open house where community members could share input on draft plans and map concepts of the key elements in the City’s General Plan.

F. Required Approvals
The City of Eastvale is the lead agency for the project, as it is the agency with primary authority over the project’s discretionary approvals. For the purposes of CEQA, the term trustee agency means a State agency having jurisdiction by law over natural resources affected by a project, which are held in trust for the people of the State of California. The term responsible agency includes all public agencies other than the lead agency that may have discretionary actions associated with the implementation of the proposed project or an aspect of subsequent implementation of the project. There are no trustee agencies with authority over the project.

Accordingly, approvals anticipated to be required from the lead agency and/or responsible agencies are listed below.

City actions would include the following:
• Certify the Final EIR for the Eastvale 2040 General Plan; • Adopt the Eastvale 2040 General Plan;
• Adopt required findings for the adoption of the Eastvale 2040 General Plan, including required findings under CEQA Guidelines Sections 15090, 15091, and 15093; and • Amend the Eastvale Municipal Code.

The City of Eastvale submitted an Application For Major Land Use Action Review to Riverside County Airport Land Use Commission (ALUC) on January 3, 2024. As a responsible agency for the project, the Riverside County ALUC was responsible for determining the project’s consistency with the Chino Airport Compatibility Plan. The project’s Application For Major Land Use Action Review was approved by the Riverside County ALUC on February 8, 2024. No other responsible agencies have authority over the project.
2240
Eastvale 2040 General Plan Update
Page | 20 CEQA Findings of Fact and Statement of Overriding Considerations III. ENVIRONMENTAL REVIEW AND PUBLIC PARTICIPATION
In accordance with CEQA Guidelines Section 15082, the City distributed an NOP of the Draft EIR to the California Governor’s Office of Planning and Research State Clearinghouse (SCH No. 2022080090), local and regional responsible and trustee agencies, and other interested parties and organizations on August 5, 2022 for a 30-day public comment period. Various agencies and other interested parties responded to the NOP. In addition, a public scoping meeting was held for the project on August 16, 2022 at Vantage Point Church (8500 Archibald Avenue, Eastvale, California 92880). Approximately 20 members of the public attended the scoping meeting. No public agency representatives attended.

The Draft EIR was prepared and circulated for review and comment by the public agencies and organizations for a 45-day public review period that began on October 31, 2023 and concluded on December 15, 2023. A Notice of Completion of the Draft EIR was sent to the California State Clearinghouse, Office of Planning and Research (SCH No. 2022080090). A Notice of Availability of the Draft EIR for review was mailed to known public agencies, organizations, and parties anticipated to have an interest in the project. The Notice of Availability was also filed with the County Clerk and published in the Press Enterprise. The City received comments on the proposed project. Those comments and the responses to comments have been incorporated into the Final EIR; refer to Section P.4, Comment Letters and Responses to Comments.

It should be noted that as part of preparation of the Final EIR, minor revisions and clarifications were included in the Final EIR. However, no such revisions resulted in any of the conditions identified in CEQA Guidelines Section 15088.5, which states that “A lead agency is required to recirculate an EIR when significant new information is added to the EIR after public notice is given of the availability of the draft EIR for public review under Section 15087 but before certification.

As used in this section, the term “information” can include changes in the project or environmental setting as well as additional data or other information. New information added to an EIR is not “significant” unless the EIR is changed in a way that deprives the public of a meaningful opportunity to comment upon a substantial adverse environmental effect of the project or a feasible way to mitigate or avoid such an effect (including a feasible project alternative) that the project’s proponents have declined to implement.” “Significant new information” requiring recirculation may include, for example, a disclosure showing that:

A new significant environmental impact would result from the project or from a new mitigation measure proposed to be implemented.

A substantial increase in the severity of an environmental impact would result unless mitigation measures are adopted that reduce the impact to a level of insignificance. 2241
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 21 A feasible project alternative or mitigation measure considerably different from others previously analyzed would clearly lessen the environmental impacts of the project, but the project’s proponents decline to adopt it.

The draft EIR was so fundamentally and basically inadequate and conclusory in nature that meaningful public review and comment were precluded. (Mountain Lion Coalition v.

Fish and Game Com. (1989) 214 Cal.App.3d 1043).

Recirculation is not required where the new information added to the EIR merely clarifies or amplifies or makes insignificant modifications in an adequate EIR. Based on changes made to the EIR text, none of the significance findings originally identified in the EIR required revision, and no new significant impacts were identified. Therefore, recirculation of the EIR for public review is not required or proposed.
2242
Eastvale 2040 General Plan Update
Page | 22 CEQA Findings of Fact and Statement of Overriding Considerations IV. FINDINGS REQUIRED UNDER CEQA
CEQA Section 21002 provides that “public agencies should not approve projects as proposed if there are feasible alternatives or feasible mitigation measures available that would substantially lessen the significant environmental effects of such projects[...]” The same statute states that the procedures required by CEQA “are intended to assist public agencies in systematically identifying both the significant effects of proposed projects and the feasible alternatives or feasible mitigation measures that will avoid or substantially lessen such significant effects.” CEQA Section 21002 goes on to state that “in the event [that] specific economic, social, or other conditions make infeasible such project alternatives or such mitigation measures, individual projects may be approved in spite of one or more significant effects.” The mandate and principles announced in CEQA Section 21002 are implemented, in part, through the requirement that agencies must adopt findings before approving projects for which EIRs are required. For each significant environmental effect identified in an EIR for a proposed project, the approving agency must issue a written finding reaching one or more of three permissible conclusions.

The first such finding is that “changes or alterations have been required in, or incorporated into, the project which avoid or substantially lessen the significant environmental effect as identified in the Final EIR” (CEQA Guidelines Section 15091(a)(1)). The second permissible finding is that “such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency” (CEQA Guidelines Section 15091 (a)(2)). The third potential conclusion is that “specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR” (CEQA Guidelines Section 15091(a)(3)). CEQA Section 21061.1 defines “feasible” to mean “capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and technological factors.” CEQA Guidelines Section 15364 adds another factor: “legal” considerations (see also Citizens of Goleta Valley v.

Board of Supervisors (1990) 52 Cal.3d 553, 565).

The concept of “feasibility” of a particular alternative or mitigation measure promotes the underlying goals and core objectives of a project (see San Diego Citizenry Group v. County of San Diego (2013) 219 Cal.App.4th 1, 18; see also City of Del Mar v. City of San Diego (1982) 133 Cal.App.3d 410, 417). “[F]easibility under CEQA encompasses ‘desirability’ to the extent that desirability is based on a reasonable balancing of the relevant economic, environmental, social, and technological factors” (Ibid).

The CEQA Guidelines do not define the difference between “avoiding” a significant environmental effect and merely “substantially lessening” such an effect. The City must therefore 2243
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 23 glean the meaning of these terms from the other contexts in which the terms are used. CEQA Section 21081, on which CEQA Guidelines Section 15091 is based, uses the term “mitigate” rather than “substantially lessen.” The CEQA Guidelines therefore equate “mitigating” with “substantially lessening.” Such an understanding of the statutory term is consistent with the policies underlying CEQA, which include the policy that “public agencies should not approve projects as proposed if there are feasible alternatives or feasible mitigation measures available which would substantially lessen the significant environmental effects of such projects” (CEQA Section 21002).

For purposes of these Findings, the term “avoid” means to not result in a significant impact. In contrast, the term “substantially lessen” refers to the effectiveness of a mitigation measure or measures to substantially reduce the severity of a significant effect to a level less than significant.

In short, CEQA requires that the lead agency adopt mitigation measures or alternatives, where feasible, to substantially lessen or avoid significant environmental impacts that would otherwise occur. Project modifications or alternatives are not required, however, where such changes are infeasible. (CEQA Guidelines, Section 15091, subd. (a)(3)).

With respect to a project for which significant impacts are not avoided or substantially lessened either through the adoption of feasible mitigation measures or a feasible environmentally superior alternative, a public agency, after adopting proper findings, may nevertheless approve the project if the agency first adopts a Statement of Overriding Considerations setting forth the specific reasons why the agency found that the project’s “benefits” rendered “acceptable” its “unavoidable adverse environmental effects” (CEQA Guidelines Sections 15093 and 15043(b)).

The California Supreme Court has stated that, “[t]he wisdom of approving…any development project, a delicate task which requires a balancing of interests, is necessarily left to the sound discretion of the local officials and their constituents who are responsible for such decisions. The law as we interpret and apply it simply requires that those decisions be informed, and therefore balanced” (Goleta, supra, 52 Cal.3d at p. 576; see also Cherry Valley Pass Acres & Neighbors v.

City of Beaumont (2010) 190 Cal.App.4th 316, 357-359).

A. Legal Effects of Findings
These Findings constitute a binding set of obligations that will come into effect when the City formally approves the proposed project.
2244
Eastvale 2040 General Plan Update
Page | 24 CEQA Findings of Fact and Statement of Overriding Considerations V. FINDINGS REGARDING SIGNIFICANT IMPACTS
The Final EIR contains an environmental analysis of the potential impacts associated with implementing the proposed project. The Final EIR concludes that all potential impacts identified in the EIR would result in a less than significant or no impact with exception of impacts related to air quality, land use and planning, and transportation which are considered significant and unavoidable.

As the lead agency, the City of Eastvale must respond to each significant effect identified in the EIR by making “findings” for each significant effect. As part of the decision-making process, the City must determine whether or how to mitigate the associated significant effects of the project, including whether to implement a project alternative. Approval of the project despite identified significant and unavoidable environmental impacts would require a Statement of Overriding Considerations, explaining why the benefits of the project outweigh the environmental effects, as set forth in this document.

A. Impacts Not Fully Mitigated to a Level of Less than Significant The City hereby finds that the following impacts from the proposed project and related approvals cannot be fully mitigated to a less than significant level and a Statement of Overriding Considerations is therefore included herein, pursuant to CEQA Guidelines Section 15093, if the proposed project is approved.

Based on the analysis provided in the EIR, project implementation has the potential to generate significant and unavoidable impacts associated with air quality, land use and planning, and transportation. Such impacts and related findings are discussed in greater detail below.

AIR QUALITY
EIR Impact 3.1-1: The project would conflict with or obstruct implementation of the applicable air quality plan.

A significant impact relative to this issue would occur if the project would conflict with or obstruct implementation of the applicable air quality plan.

Impacts
South Coast Air Quality Management District (SCAQMD) thresholds are intended to evaluate the air quality impacts from individual development projects and do not apply to plan-level projects, such as the proposed Eastvale 2040 General Plan. Emissions are dependent on the exact size, nature, and location of an individual land use type, combined with reductions in localized impacts from the removal of existing land use types, as applicable (i.e., conversion of light industrial uses).

Emissions associated with the operation of individual projects could exceed project-specific thresholds established by SCAQMD.
2245
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 25 On December 2, 2022, the SCAQMD Governing Board adopted the 2022 Air Quality Management Plan (AQMP) which incorporates the latest scientific and technical information and planning assumptions, including the latest applicable growth assumptions, updated emission inventory methodologies for various source categories. Additionally, the 2022 AQMP utilized information and data from the Southern California Association of Governments (SCAG) and its 2020-2045 Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS). The SCAQMD considers projects that are consistent with the 2022 AQMP, which is intended to bring the Basin into attainment for all criteria pollutants, to also have less than significant cumulative impacts.

The project involves long-term growth associated with buildout of the City of Eastvale. The emissions of criteria pollutants associated with individual future developments within the Planning Area could exceed SCAQMD thresholds for criteria pollutants. Future development under the proposed Eastvale 2040 General Plan would be required to comply with the California Air Resources Board’s (CARB) requirements to minimize short-term emissions from on-road and off-road diesel equipment, including limiting heavy-duty diesel motor vehicle idling to no more than 5 minutes at any given time, and with SCAQMD’s regulations such as Rule 403 for controlling fugitive dust and Rule 1113 for controlling volatile organic compounds (VOC) emissions from architectural coatings. Compliance with these measures and requirements would be consistent with and meet or exceed the AQMP requirements for control strategies intended to reduce criteria pollutants emissions from construction equipment and activities. Additionally, future individual development projects within the Planning Area would be subject to environmental review pursuant to CEQA and all applicable SCAQMD rules and regulations.

As discussed below in EIR Impact 3.1-2, emissions of ROG, CO, PM10, and PM2.5 resulting with the proposed Eastvale 2040 General Plan would be significantly higher than the existing setting.

Given the volume of air pollutants attributable to buildout of the Planning Area, Eastvale 2040 could potentially cause an increase in the frequency or severity of existing air quality violations.

The 2022 AQMP utilizes growth projections from the existing 2012 General Plan. Compared to 2012 General Plan, the proposed Eastvale 2040 General Plan anticipates an additional 4,173 units of residential land use development and an estimated 7 million square feet of non-residential land use development under the full buildout conditions. The project would not include any direct demolition or development. Future individual development projects within the Planning Area would be required to undergo environmental review pursuant to CEQA, as well as comply with all applicable SCAQMD rules and regulations. However, as future development anticipated under the proposed Eastvale 2040 General Plan would cause potential significant and unavoidable air quality impacts, the proposed project would have the potential to contribute to a violation of the ambient air quality standards. Thus, impacts associated with compliance with the 2022 AQMP would be significant and unavoidable.
2246
Eastvale 2040 General Plan Update
Page | 26 CEQA Findings of Fact and Statement of Overriding Considerations Air quality planning within the affected air basin focuses on the attainment of ambient air quality standards at the earliest feasible date. Projections for achieving air quality goals are based on assumptions regarding population, housing, and growth trends. Determining project consistency is focused on whether a project exceeds the assumptions utilized in preparing the forecasts presented in the 2022 AQMP.

A project is consistent with the 2022 AQMP in part if it is consistent with the population, housing, and employment assumptions used in development of the 2022 AQMP. The population, housing, and employment forecasts, which are adopted by SCAG’s Regional Council, are based on the local plans and policies applicable to the Planning Area, which are used by the Southern California Association of Governments (SCAG) in all phases of implementation and review. The proposed Eastvale 2040 General Plan would accommodate more residential units than the existing 2012 General Plan, and the SCAQMD has not incorporated these projections into the 2022 AQMP. With the approval of the proposed Eastvale 2040 General Plan, the SCAG would include the growth projections associated with Eastvale 2040 in the regional planning projections, and SCAQMD would incorporate the same projections in the next update of the AQMP. However, since projections associated with the Eastvale 2040 General Plan are not currently included in the 2022 AQMP, the Eastvale 2040 General Plan would not meet this criterion, and the impact would be potentially significant.

Additionally, the goals and policies of the proposed Eastvale 2040 General Plan Open Space and Conservation Element would prepare the City for long-term adaptability. For example, proposed Policy CO-8.1 would promote compact and efficient development to minimize vehicle miles traveled (VMT) and greenhouse gas emissions. Policy CO-8.2 would promote the improvement of indoor air quality through the California Building and Energy Codes and through participation in public health programs and services. Policy CO-8.3 would ensure the City considers CARB’s recommendations for the siting of new sensitive land uses and exposure to specific source categories. Policy CO-8.4 would require dust control plans, revegetation, and soil compaction to prevent fugitive dust emissions for both active construction sites, and vacant sites approved for development.

The 2022 AQMP relied upon SCAG’s 2020-2045 RTP/SCS for land use planning strategies. As discussed in Section 3.4, Energy and Greenhouse Gases, of the EIR, the proposed Eastvale 2040 General Plan would be consistent with SCAG’s 2020-2045 RTP/SCS. The Eastvale 2040 General Plan outlines strategies for integration of uses in different parts of the City and a better connection between employment and residential uses, with more areas designated for mixeduse development such as Downtown West Policy Area, Chandler Policy Area, Downtown East Policy Area, and Citrus Policy Area. Higher densities, especially in mixed use designations, increase capacity for residential development near community-serving commercial, retail, and office uses as well as schools, parks, and recreational facilities, and will make it easier for residents to travel throughout the community. Therefore, although the proposed Eastvale 2040 2247
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 27 General Plan would accommodate an increase in residential units and non-residential development within the Planning Area, the developments would be consistent with the land use planning strategies.

As discussed above, the proposed Eastvale 2040 General Plan would be inconsistent with the 2022 AQMP. Implementation of Eastvale 2040 would have the potential to contribute to a violation of the ambient air quality standards. Thus, impacts associated with compliance with the 2022 AQMP would be significant and unavoidable.

Explanation
As noted, the proposed Eastvale 2040 General Plan would accommodate more residential units than the existing 2012 General Plan, and the SCAQMD has not incorporated these projections into the 2022 AQMP. With approval of the proposed Eastvale 2040 General Plan, the SCAG would include the growth projections associated with Eastvale 2040 in the regional planning projections, and SCAQMD would incorporate the same projections in the next update of the AQMP. However, until such projections associated with the Eastvale 2040 General Plan are incorporated into the 2022 AQMP, the Eastvale 2040 General Plan would conflict with the AQMP, and impacts would remain significant and unavoidable.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that air quality impacts resulting from project conflict with or obstruct implementation of the applicable air quality plan would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

EIR Impact 3.1-2: Cumulatively considerable net increase of criteria pollutants for which the project region is non-attainment.

A significant impact relative to this issue would occur if the project would result in a cumulatively considerable net increase of criteria pollutants for which the project region is non-attainment under an applicable federal or State ambient air quality standard.

Impacts
Construction-related emissions are generally short-term or temporary in duration; however, they have the potential to result in a significant impact with respect to air quality. Further, the proposed project allows for land use intensification in certain portions of the Planning Area.

Future construction-related emissions could lead to the violation of an applicable air quality standard or contribute substantially to an existing or projected air quality violation. 2248
Eastvale 2040 General Plan Update
Page | 28 CEQA Findings of Fact and Statement of Overriding Considerations Individual development projects under the proposed Eastvale 2040 General Plan would be required to undergo subsequent environmental review pursuant to CEQA and would be required to employ all feasible mitigation measures to reduce construction-related emissions. All future projects developed under Eastvale 2040 would also be required to comply with SCAQMD rules and regulations. Furthermore, future construction activities under the proposed Eastvale 2040 General Plan would be required to comply with the CARB Air Toxics Control Measure, which limits diesel powered equipment and vehicle idling to no more than five minutes at a location, and the CARB In-Use Off-Road Diesel Vehicle regulation, CARB Truck and Bus regulation, and CARB ACT regulation, all of which require operators to repower or replace higher-emitting construction equipment with less polluting models and employ zero- and near-zero-emissions on-road truck technologies as they become developed and commercially available on vehicle fleet. Additionally, construction of future development would be required to comply with SCAQMD rules and regulations including Rule 403 for the control of fugitive dust and Rule 1113 for the control of volatile organic compound (VOC) emissions from architectural coatings. Mandatory compliance with these CARB and SCAQMD rules and regulations would reduce emissions, particularly for nitrogen oxides (NOX), coarse particulate matter (PM10), and fine particulate matter (PM2.5), during future construction activities under Eastvale 2040.

Future development projects would be required to comply with Eastvale Municipal Code Section 120.02.010 which requires all land use and development review applications and all public works and other public projects to undergo environmental review as an integral part of the process for such applications prior to consideration by the decision-making authority. Future development would be subject to conformance with all applicable SCAQMD rules and regulations, as well as other control measures, to reduce construction emissions. However, even with mandatory compliance with CARB and SCAQMD rules regulations, it is possible that some future development projects could be large enough in scale and/or intensity such that many pieces of heavy-duty construction equipment and/or heavy-duty trucks may be required and that construction period emissions could exceed the SCAQMD significance thresholds. Therefore, impacts are considered significant and unavoidable.

Operational impacts associated with area sources, energy sources, and mobile sources (vehicular traffic) were estimated for the project and are detailed in EIR Table 3.1-3, Existing and ProjectGenerated Operational Emissions. The Planning Area’s stationary source emissions primarily consist of residential, industrial, and commercial uses. Energy sources consist of electricity and natural gas usage. Mobile source emissions are produced by each trip generating land use within the City (e.g., residential, schools, retail, office, etc.). The proposed project would allow for additional residential and nonresidential development over existing conditions. Future sitespecific development proposals would be evaluated for potential air emissions once development details have been determined and are available, and individual projects may or may not result in significant operational air quality emissions. Furthermore, proposed policies in the Eastvale 2040 General Plan aim to improve air quality within the Planning Area by encouraging 2249
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 29 innovative approaches such as improvements to indoor air quality through the California Building and Energy Codes and through participation in public health programs and services, promoting compact and efficient development to minimize vehicle miles traveled and greenhouse gas emissions, and implementing all SCAQMD’s applicable rules and regulations to reduce air pollution.

Buildout of the Eastvale 2040 General Plan would significantly increase regional pollutants over current conditions, although ozone precursor pollutant (i.e., NOX) would decrease due to improvements in vehicular technology for mobile source emissions. Given the volume of air pollutants attributable to buildout of the proposed Planning Area, impacts would be significant and unavoidable.

Additionally, the SCAQMD concludes that it is not currently possible to accurately quantify ozonerelated health impacts caused by NOX or VOC emissions from relatively small projects (defined as projects with regional scope) due to photochemistry and regional model limitations. Adverse health effects induced by criteria pollutant emissions were determined to have a less than significant impact relative to air quality impacts.

Explanation
Future development projects would be required to comply with Eastvale Municipal Code Section 120.02.010 which requires all land use and development review applications and all public works and other public projects to undergo environmental review as an integral part of the process for such applications prior to consideration by the decision-making authority. Future development would be subject to conformance with all applicable SCAQMD rules and regulations, as well as other control measures, to reduce construction emissions.

As noted, even with mandatory compliance with CARB and SCAQMD rules regulations, some future development resulting with buildout of the Eastvale 2040 General Plan may be large enough in scale and/or intensity such that construction period emissions could exceed the SCAQMD significance thresholds. As the extent of such development and the associated impacts are unknown at this time, no feasible mitigation is available to reduce such impacts. Therefore, impacts would remain significant and unavoidable. Further, buildout of the Eastvale 2040 General Plan would significantly increase regional pollutants over current conditions, although ozone precursor pollutant (i.e., NOX) would decrease due to improvements in vehicular technology for mobile source emissions. Given the volume of air pollutants attributable to future buildout under Eastvale 2040, impacts are considered significant and unavoidable and mitigation is not feasible.

Mitigation Measures
No feasible mitigation measures are available.
2250
Eastvale 2040 General Plan Update
Page | 30 CEQA Findings of Fact and Statement of Overriding Considerations Finding
The City hereby finds that cumulatively considerable air quality impacts associated with a net increase of criteria pollutants for which the project region is non-attainment would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

EIR Impact 3.1-3: Result in localized emissions impacts or exposure to substantial pollutant concentrations.

A significant impact relative to this issue would occur if the project would result in localized emissions impacts or expose sensitive receptors to substantial pollutant concentrations.

Impacts
Localized Significance Thresholds (LSTs) were developed in response to SCAQMD Governing Boards’ Environmental Justice Enhancement Initiative (I-4). The SCAQMD provided the Final Localized Significance Threshold Methodology (dated June 2003 [revised October 2009]) for guidance. The LST methodology assists lead agencies in analyzing localized impacts associated with project-specific level proposed projects. The SCAQMD provides the LST lookup tables for one-, two-, and five-acre projects emitting CO, NOX, PM2.5, or PM10. The LST methodology and associated mass rates are not designed to evaluate localized impacts from mobile sources traveling over the roadways. The project site is within Source Receptor Area (SRA) 22, Corona/Norco Area.

Implementation of Eastvale 2040 does not include any planned demolition or development.

Individual development projects within Planning Area would occur in incremental phases over time. The phasing and exact details of each project would be evaluated by the City on a case-bycase basis, and these individual projects would be required to analyze LSTs under CEQA, as applicable. Additionally, future development projects would be required to comply with all applicable SCAQMD rules and regulations, as well as other control measures, to reduce construction emissions. However, as individual development projects may occur close to existing sensitive receptors, construction activities associated with the Eastvale 2040 General Plan would potentially expose sensitive receptors to substantial pollutant concentrations. Impacts were identified as potentially significant.

According to SCAQMD localized significance threshold methodology, LSTs would apply to the operational phase of a proposed project if the project includes stationary sources or attracts mobile sources that may spend extended periods queuing and idling at the site (e.g., warehouse or transfer facilities). The analysis in the EIR determined that impacts relative to operations would be less than significant in this regard.
2251
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 31 There are sensitive receptors located in the Planning Area. However, health impacts on sensitive receptors associated with exposure to emissions from construction of developments projects associated with the proposed project are anticipated to be less than significant because construction activities of individual development projects are expected to occur well below the 30-year exposure period used in health risk assessments. Additionally, emissions would be shortterm and intermittent in nature, and therefore would not generate toxic air contaminants (TACs) emissions at high enough exposure concentrations to represent a health hazard. However, as construction of these future developments may occur within close proximity to sensitive receptors, there is the potential to exceed regulatory levels. Therefore, health risk with respect to the development anticipated by the project would be potentially significant.

Operations associated with the Eastvale 2040 General Plan are not anticipated to result in an elevated cancer or other health risk to nearby sensitive receptors and the impact would be less than significant.

Analysis in the EIR also demonstrates that the project would not contribute considerably to the formation of carbon monoxide hotspots and a less than significant impact would occur.

Explanation
As phasing and details of future development is unknown at this time, such projects would be evaluated by the City on a case-by-case basis, and individual project impacts identified as appropriate. Although future development would be required to comply with applicable SCAQMD rules and regulations and other control measures to reduce construction emissions, construction activities associated with the Eastvale 2040 General Plan may occur near sensitive receptors, potentially exposing such receptors to substantial pollutant concentrations. As such impacts, nor feasible mitigation to reduce such impacts, cannot be determined at this time, project impacts are considered significant and unavoidable. Further, as construction of such future developments may occur within close proximity to sensitive receptors, there is the potential to exceed regulatory levels relative to adverse health effects. Therefore, health risks with respect to future development anticipated with Eastvale 2040 cannot be determined at this time. As such, impacts are significant and unavoidable and mitigation is not feasible.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that air quality impacts related to localized emissions or exposure to substantial pollutant concentrations would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein. 2252
Eastvale 2040 General Plan Update
Page | 32 CEQA Findings of Fact and Statement of Overriding Considerations EIR Impact 3.1-5: Cumulatively considerable impact regarding consistency with an applicable air quality plan.

A significant impact relative to this issue would occur if the project would result in a cumulatively considerable impact regarding consistency with an applicable air quality plan.

Impacts
As analyzed in the EIR, implementation of the Eastvale 2040 General Plan would include growth projections not currently included in the 2022 AQMP. Therefore, the project is inconsistent with the 2022 AQMP and cumulative impacts would be significant and unavoidable.

Explanation
Future related projects would be required to analyze project-level consistency with applicable air quality plans, including the 2022 AQMP. With approval of the proposed Eastvale 2040 General Plan, the SCAG would include the growth projections associated with the proposed Eastvale 2040 in the regional planning projections, and SCAQMD would incorporate the same projections in the next update of the AQMP. However, as projections associated with the Eastvale 2040 General Plan are not currently included in the 2022 AQMP, cumulative impacts due to conflict with an applicable air quality plan would remain significant and unavoidable until the SCAG updates growth projections associated with Eastvale 2040 in the regional planning projections. Impacts associated with the proposed Eastvale 2040 General Plan in this regard would be cumulatively considerable.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that cumulative air quality impacts associated with consistency with an applicable air quality plan would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

EIR Impact 3.1-6: Cumulative impacts due to short-term construction air emissions.

A significant impact relative to this issue would occur if the project would result in cumulative impacts due to short-term construction air emissions.

Impacts
SCAQMD thresholds for criteria pollutants are established for individual development projects, and it is assumed that some of the projects that would be implemented under the proposed Eastvale 2040 General Plan could individually exceed the SCAQMD thresholds. Based on the programmatic-level construction analysis provided in the EIR, construction-related emissions 2253
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 33 associated with future development projects in the Planning Area and surrounding cities may be “cumulatively considerable.” Therefore, cumulative impacts relative to construction are considered significant and unavoidable.

Explanation
The SCAQMD neither recommends quantified analyses of cumulative construction emissions, nor does it provide separate methodologies or thresholds of significance to be used to assess cumulative construction impacts. The SCAQMD significance thresholds for construction are intended to meet the objectives of the 2022 AQMP to ensure the NAAQS and CAAQS are not exceeded. As the project applicant has no control over the timing or sequencing of the related projects, any quantitative analysis to ascertain the daily construction emissions that assumes multiple, concurrent construction would be speculative. In addition, construction-related criteria pollutant emissions are temporary in nature and cease following project completion.

As noted above, it is assumed that some future development implemented under Eastvale 2040 may individually exceed the SCAQMD thresholds. Based on the programmatic-level construction analysis provided in the EIR, construction-related emissions associated with future development projects in the Planning Area and surrounding cities may be “cumulatively considerable.” Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that cumulative impacts associated with short-term construction air emissions would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

EIR Impact 3.1-7: Cumulative impacts due to long-term operational air emissions.

A significant impact relative to this issue would occur if the project would result in cumulative impacts due to long-term operational air emissions.

Impacts
As previously discussed, growth anticipated by the project would not be consistent with SCAG’s growth forecast, and therefore is not consistent with the 2022 AQMP. The proposed Eastvale 2040 General Plan would therefore conflict with 2022 AQMP. The contribution of daily operational emissions from future development projects could be cumulatively considerable.

Cumulative impacts are significant and unavoidable in this regard. 2254
Eastvale 2040 General Plan Update
Page | 34 CEQA Findings of Fact and Statement of Overriding Considerations Explanation
The SCAQMD has set forth both a methodological framework as well as significance thresholds for the assessment of a project’s cumulative operational air quality impacts. The SCAQMD’s approach for assessing cumulative impacts is based on the SCAQMD’s 2022 AQMP forecasts of attainment of NAAQS in accordance with the requirements of the Federal and State CAAs. This forecast also considers SCAG’s forecasted future regional growth. As such, the analysis of cumulative impacts focuses on determining whether the project is consistent with the growth assumptions upon which the SCAQMD’s 2022 AQMP is based. If the project is consistent with the growth assumptions, then the future development would not impede the attainment of 2022 AQMP, and a significant cumulative air quality impact would not occur.

As indicated, growth anticipated by Eastvale 2040 would not be consistent with SCAG’s growth forecast, and therefore is not consistent with the 2022 AQMP. Operational emissions from future development projects could be cumulatively considerable, and therefore, cumulative impacts due to long-term operational emissions are significant and unavoidable.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that cumulative impacts associated with long-term operational air emissions would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

LAND USE AND PLANNING
EIR Impact 3.7-2: Conflict with a land use plan, policy, or regulation aimed at reducing an environmental effect.

A significant impact relative to this issue would occur if the project would conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect.

Impacts
The SCAG reviews environmental documents for regionally significant projects for their consistency with the adopted 2020-2045 RTP/SCS. SCAG refers to CEQA Guidelines Section 15206, Projects of Statewide, Regional, or Areawide Significance, in determining whether a project meets the criteria to be deemed regionally significant. As the proposed project consists of the Eastvale 2040 General Plan, the project is considered regionally significant per CEQA Guidelines Section 15206. The 2020-2045 RTP/SCS performance goals were adopted to help focus future investments on the best-performing projects and strategies to preserve, maintain 2255
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 35 and optimize the performance of the existing transportation system. The project’s consistency with SCAG’s goals is evaluated in Section 3.4, Energy and Greenhouse Gases Emissions, of the EIR.

As concluded, the project would be consistent with the adopted 2020-2045 RTP/SCS and no conflict would occur. Impacts would be less than significant.

Additionally, the City is a signatory to the Western Riverside County Multiple Species Habitat Conservation Plan (MSHCP), and future development within the project area would be subject to compliance with the MSHCP. The MSHCP covers multiple species and habitats within multiple jurisdictions. As such, City regulations on biological resources are generally dictated by the MSHCP and compliance with CEQA where necessary. According to the Eastvale Municipal Code Chapter 4.62, Multiple Species Habitat Conservation Plan Mitigation Fee, if development of a project results in an impact to species protected in the MSHCP, a development mitigation fee is required to supplement the financing or acquisition of lands supporting species covered by the MSHCP and to pay for new development's fair share or the cost.

Eastvale 2040 General Plan Policy NR-5.1 would support this by ensuring that the City continues its participation and coordination with existing or proposed habitat conservation and natural resource management plans for private and public lands. In addition, future development in the project area would be required to demonstrate consistency with the MSHCP. Therefore, the Eastvale 2040 General Plan would not conflict with the provisions of the MSHCP. Impacts were determined to be less than significant.

Eastvale 2040 will update all the State-required General Plan elements of the City’s existing 2012 General Plan, including Land Use, Circulation, Housing, Conservation, Open Space, Noise, and Safety. Such actions will require an update to the City’s Zoning Code and Zoning Map.

Environmental impacts associated with the Eastvale 2040 General Plan are evaluated throughout the EIR. Once the City’s Zoning Code and Zoning Map are amended, there will be no inconsistency between the General Plan and the zoning code. Impacts were determined to be less than significant.

As noted previously, a conflict would occur relative to conformance with the applicable AQMP, and impacts are significant and unavoidable. The SCAQMD Governing Board implements its 2022 AQMP which utilized information and data from the SCAG and its 2020-2045 RTP/SCS. The SCAQMD considers projects that are consistent with the 2022 AQMP, which is intended to bring the air basin into attainment for all criteria pollutants, to also have less than significant cumulative impacts. The 2022 AQMP utilizes growth projections from the City’s current 2012 General Plan. As projections associated with the Eastvale 2040 General Plan are not currently included in the 2022 AQMP, impacts due to conflict with an adopted plan, policy, or regulation would be potentially significant until the SCAG updates growth projections associated with Eastvale 2040 in the regional planning projections. The proposed project would therefore be 2256
Eastvale 2040 General Plan Update
Page | 36 CEQA Findings of Fact and Statement of Overriding Considerations inconsistent with SCAG’s regional planning efforts and a significant and unavoidable impact would occur.

Explanation
As noted previously, compared to the 2012 General Plan, the Eastvale 2040 General Plan anticipates an additional 4,173 units of residential land use development and an estimated 7 million square feet of non-residential land use development under the full buildout conditions.

As future development anticipated under the proposed Eastvale 2040 General Plan would cause potential significant and unavoidable air quality impacts, the proposed project would have the potential to contribute to a violation of the ambient air quality standards.

Further, the Eastvale 2040 General Plan would accommodate more residential and nonresidential development compared to the existing 2012 General Plan, and the SCAQMD has not incorporated these projections into the 2022 AQMP. With approval of the proposed Eastvale 2040 General Plan, the SCAG would include the growth projections associated with the proposed Eastvale 2040 in the regional planning projections, and SCAQMD would incorporate the same projections in the next update of the AQMP. However, as projections associated with the Eastvale 2040 General Plan are not currently included in the 2022 AQMP, impacts would remain significant and unavoidable until the SCAG updates growth projections associated with Eastvale 2040 in the regional planning projections.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that land use and planning impacts associated from project conflict with a land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

TRANSPORTATION
EIR Impact 3.11-1: Conflict with an applicable program, policy, ordinance, or policy addressing the circulation system.

A significant impact relative to this issue would occur if the project would conflict with an applicable program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, and pedestrian facilities.

Impacts
Future development under the Eastvale 2040 General Plan is intended to support multimodal transportation options and would be consistent with policies, plans, and programs that support 2257
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 37 alternative transportation, as identified in the General Plan Mobility Element. Future growth would minimize impacts by making use of the public right-of-way to enhance the user experience and by integrating multimodal transportation options via pedestrian, bike, vehicular, and transit zones. In addition, the Eastvale 2040 General Plan would encourage pedestrian and bicyclist activity and would concentrate future development in areas that have or will have public transit and activity centers to provide residents and visitors access to such modes of transit.

Enhancements to encourage walking, biking, or taking transit will be integrated into new development, while ensuring that City design standards are met to provide adequate movement and public safety. Therefore, implementation of the Eastvale 2040 General Plan would not conflict with a program, plan, ordinance, or policy addressing the circulation system. Impacts were determined to be less than significant.

Additionally, SCAG reviews environmental documents for regionally significant projects for their consistency with the adopted 2022-2045 RTP/SCS. The SCAQMD Governing Board implements its 2022 AQMP which incorporates the latest scientific and technical information and planning assumptions, including the latest applicable growth assumptions, updated emission inventory methodologies for various source categories. The 2022 AQMP utilized information and data from SCAG and its 2020-2045 RTP/SCS. The SCAQMD considers projects that are consistent with the 2022 AQMP, which is intended to bring the air basin into attainment for all criteria pollutants, to also have less than significant cumulative impacts.

The 2022 AQMP utilizes growth projections from the City’s current 2012 General Plan. Compared to the 2012 General Plan, the Eastvale 2040 General Plan anticipates an additional 4,173 units of residential land use development and an estimated 7 million square feet of non-residential land use development under the full buildout conditions. The project would not include any direct demolition or development. Future individual development projects within the planning area would be required to undergo environmental review pursuant to CEQA, as well as comply with all applicable SCAQMD rules and regulations. However, as future development anticipated under the proposed Eastvale 2040 General Plan would cause potential significant and unavoidable air quality impacts, the proposed project would have the potential to contribute to a violation of the ambient air quality standards.

The 2020-2045 RTP/SCS performance goals were adopted to help focus future investments on the best-performing projects and strategies to preserve, maintain and optimize the performance of the existing transportation system. The Eastvale 2040 General Plan would accommodate more residential units than the existing 2012 General Plan and the SCAQMD has not incorporated these projections into the 2022 AQMP. As such, the proposed project would be inconsistent with SCAG’s regional planning efforts and a significant and unavoidable impact would occur. 2258
Eastvale 2040 General Plan Update
Page | 38 CEQA Findings of Fact and Statement of Overriding Considerations Explanation
As stated, projections associated with the Eastvale 2040 General Plan are not currently included in the 2022 AQMP and impacts due to conflict with an adopted plan, policy, or regulation are therefore considered potentially significant. With approval of the proposed Eastvale 2040 General Plan, SCAG would include the growth projections associated with Eastvale 2040 in the regional planning projections, and SCAQMD would incorporate the same projections in the next update of the AQMP. However, until such actions are taken, the proposed project would remain inconsistent with SCAG’s regional planning efforts resulting in a significant and unavoidable impact.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that transportation impacts associated with project conflict with an applicable program, plan, ordinance, or policy addressing the circulation system would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

EIR Impact 3.11-2: Conflict and be inconsistent with CEQA Guidelines Section 15064.3(b).

A significant impact relative to this issue would occur if the project would conflict and be inconsistent with CEQA Guidelines Section 15064.3, Subdivision (b).

Impacts
Land uses included in the Eastvale 2040 General Plan include single family, multi family, retail, industrial flex, office space, business professional, commercial retail, water, open space, recreation, and right-of-way. In addition to these general land use categories, the Eastvale 2040 General Plan includes four Policy Areas which are primarily mixed use and demonstrate the greatest opportunities for growth and development in the City over the next 20 or more years.

For the VMT analysis in the EIR, the Riverside County Transportation Model was used to prepare the traffic forecasts and VMT for the 2012 General Plan and the Eastvale 2040 General Plan. The travel demand forecasting model uses traffic analysis zones which contain socioeconomic data and other model inputs. When calculating VMT, residential VMT is based on Home Based trips (for all home-based trip types, productions only). Employment VMT is based on Home Based Work trips (attractions only).

The City has adopted thresholds and general guidance on how VMT impacts for development projects and transportation projects should be evaluated. City adopted VMT metrics are as follows:
2259
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 39 • Riverside Countywide Average VMT/Service Population = 15.68 The City of Eastvale utilizes a series of VMT screening criteria to streamline land use project review and transportation project review for CEQA transportation impacts. Projects in the City of Eastvale may be screened out if they meet one of the criteria. For land development projects, a significant transportation impact would occur if the baseline or cumulative project generated VMT per capita exceeds the Riverside County average VMT per capita for General Plan buildout conditions. For transportation projects, a significant transportation impact would occur if addition of the project results in a net cumulative increase in regional VMT for the County of Riverside region.

As determined in the EIR, implementation of the Eastvale 2040 General Plan would result in an increase in Citywide population and a decrease in employees. As a result, Homebased VMT (productions) would increase and Homebased Work VMT (attractions) would decrease.

Evaluating the residential VMT metric, the Eastvale 2040 VMT per capita would decrease compared to both the existing (2018) condition and the 2012 General Plan condition. For the employment metric, Eastvale 2040 would result in a decrease in VMT per employee over the existing condition (2018 Eastvale), but the decrease would be less than that previously forecast for the 2012 General Plan. Both the VMT per capita and the VMT per employee would be well above the Countywide average for year 2045, but would be a reduction over the existing conditions. Such conditions indicate that the land uses planned in the City align with the regional goal of reducing VMT. However, as metrics for Riverside Countywide Average VMT/Service Population and Riverside Countywide Average VMT/Employee would be exceeded, a significant impact would occur.

Explanation
The City of Eastvale is largely built out and future development is therefore anticipated to occur as infill or redevelopment over the next 20 years. Therefore, operational improvements within the City are anticipated to focus on addressing delays at intersections and providing travel options that reduce overall dependence on automobile travel. Smart signals, improved traffic signal communication infrastructure, and other features could be integrated into the City’s traffic signal system to ensure that traffic flow and capacity is optimized along the City’s busiest corridors. Fee programs may also be considered to help fund Citywide network improvements.

It is anticipated that providing travel options and accommodating multiple travel modes (e.g., vehicular and transit zones) within the public rights-of-way would reduce reliance on single occupant vehicle trips, with excess space within the rights-of-way being repurposed to provide new, enhanced pedestrian and bicycle facilities. Repurposing can be accomplished without reducing capacity by reducing the width of existing travel lanes and center medians. Providing mobility hubs and charging stations for electric-assist (e-assist) bikes or scooters would also help to make these travel modes more viable throughout the City. The City would also continue to 2260
Eastvale 2040 General Plan Update
Page | 40 CEQA Findings of Fact and Statement of Overriding Considerations coordinate with local and regional agencies to provide new or enhanced transit service that connects to regional rail and bus routes. Such enhancements would further increase travel options for the City’s residents and employees.

The Eastvale 2040 General Plan Mobility Element identifies goals and policies aimed at the reduction of vehicle trips and the provision of goods and services, as well as access to public transit. Key policies are aimed at achieving a system of roadways that support multi-modal features (Policy MC-3.1); adhering to the principles of complete streets to facilitate safe pedestrian movement (Policy MC-2.1); coordinating with Caltrans, Riverside County Transportation Commission, and other transit agencies to identify the need for park-and-ride facilities along major corridors and at major activity centers (Policy MC-5.3); encouraging transitrelated uses, high density residential housing, and commercial uses along transit corridors to maximize the potential for transit trips (Policy MC-5.8); and, evaluating roadways to determine whether reconfiguration or modification of the right-of-way may be possible to provide pedestrian facilities, trails, bike lanes, and additional landscaped medians and parkways, among others (Policy MC-2.7). Additional goals and policies to address mobility, non-motorized transportation, public transportation, and alternative means of transportation (e.g., bicycle, pedestrian) are also included in the Mobility Element. Other relevant goals and policies identified in the Open Space and Conservation Element and the Land Use Element also address mobility and enhancing the connection between land uses and transit to reduce automobile use. Future development under the Eastvale 2040 General Plan would occur in conformance with such goals and policies as buildout occurs through 2040.

The types of mitigation that affect VMT are those that reduce the number of single occupant vehicles generated by a project. This can be accomplished by changing the land uses being proposed or by implementing transportation demand management (TDM) strategies, which are reductions available from certain types of project site modifications, programming, and operational changes. If a project has a significant impact, TDM strategies would be built into the project to reduce the VMT below the threshold. TDM strategies for consideration include but not limited to diversifying land use; improving pedestrian networks; implementing neighborhood traffic management infrastructure; building bike network improvements; installing workplace bike storage, locker, and shower facilities; and providing commute-based ride-share programs such as carpooling and vanpooling. The effectiveness of identified TDM strategies is based primarily on research documented in the 2010 California Air Pollution Control Officers Association publication, Quantifying Greenhouse Gas Mitigation Measures.

Specific mitigation strategies need to be tailored to the characteristics of each future development project under the Eastvale 2040 General Plan, and their effectiveness needs to be analyzed and documented as part of the environmental review process to determine if impacts could be mitigated or if they would remain significant and unavoidable. Given that research on the effectiveness of TDM strategies is continuing to evolve, feasible mitigation measures should 2261
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 41 be considered based on the best data available at the time a project is being considered by the City.

While Eastvale 2040 would be implemented in compliance with relevant local and regional plans, as well as identified General Plan goals and policies aimed at reducing dependence on vehicles and enhancing access to jobs, goods, and services, impacts related to VMT would not be reduced to below the Riverside County Average VMT per Service Population. As there are no additional quantifiable VMT-reducing measures that the project can feasibly implement, transportation impacts relative to VMT would remain significant and unavoidable.

Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that transportation impacts associated with project conflict or inconsistency with CEQA Guidelines Section 15064.3, Subdivision (b) would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the impact to a less than significant level, a Statement of Overriding Considerations is included herein.

EIR Impact 3.11-5: Result in a cumulative impact related to transportation.

A significant impact relative would occur if the project would result in a direct or indirect cumulative effect related to transportation when considered with other past, present, or reasonably foreseeable future projects.

Impacts
The project would not contribute to a significant cumulative transportation impact resulting from hazards due to a geometric design feature or incompatible uses, or inadequate emergency access. Implementation of the Eastvale 2040 General Plan would not contribute to a significant impact resulting from conflict with an applicable program, plan, ordinance, or policy addressing the circulation system, including transit, roadway, bicycle, or pedestrian facilities. Future development projects would be evaluated on a project-specific basis for their potential to contribute to a cumulative effect in this regard. Additionally, all cumulative projects would be required to make payment of the City’s transportation impact fees to ensure that transportation facilities continue to be adequately provided and maintained over the long term. As the proposed project was determined to have a less than significant impact relative to these thresholds, it is not anticipated that the project would contribute to a significant cumulative impact.

Implementation of Eastvale 2040 would have the potential to conflict and be inconsistent with CEQA Guidelines Section 15064.3, subdivision (b). As direct impacts pertaining to VMT were determined to be significant and unavoidable, it is anticipated that the project would, when 2262
Eastvale 2040 General Plan Update
Page | 42 CEQA Findings of Fact and Statement of Overriding Considerations considered with other development projects, contribute to a significant cumulative impact in this regard. Although the Eastvale 2040 General Plan includes numerous goals and policies related to integrating transportation and land use planning to provide mobility options, high quality active and passive public open spaces, a regional trail system, and recreation facilities based on community needs, VMT reductions at buildout conditions would be substantially lower than the 15 percent minimum threshold. As such, the contribution to VMT generation in the region would be cumulatively considerable.

Explanation
Cumulative transportation impacts are generally influenced by changes in regional population, housing, and/or employment growth projections prepared by SCAG and found in the RTP/SCS. A project that falls below an efficiency-based threshold that is aligned with long-term environmental goals and relevant plans would have no cumulative impact distinct from the project impact. Accordingly, a finding of a less than significant project impact would imply a less than significant cumulative impact, and vice versa.

Future development under the Eastvale 2040 General Plan would result in an increase in residential development and a decrease in commercial development when compared to existing conditions. Implementation of Eastvale 2040 would result in an increase in Citywide population and a decrease in employees. As a result, Homebased VMT (productions) would increase and Homebased Work VMT (attractions) would decrease. Evaluating the residential VMT metric, the Eastvale 2040 VMT per capita would decrease compared to both the existing (2018) condition and the 2012 General Plan condition. For the employment metric, Eastvale 2040 would result in a decrease in VMT per employee over the existing condition (2018 Eastvale), but the decrease would be less than that previously forecast for the 2012 General Plan. Both the VMT per capita and the VMT per employee would be well above the Countywide average for year 2045 but would be a reduction over the existing conditions. Such conditions indicate that the land uses planned in the City align with the regional goal of reducing VMT.

VMT reductions at buildout conditions for Eastvale 2040 would be substantially lower than the 15 percent minimum threshold, and therefore, a significant and unavoidable impact would occur.

Although the Eastvale 2040 General Plan includes numerous goals and policies related to integrating transportation and land use planning to provide mobility options and comfort for pedestrians, bicyclists, transit users, and personal vehicles; and providing a balance of high quality active and passive public open spaces, a regional trail system, and recreation facilities based on community needs, reductions needed would not be achieved. Based on the discussion above, and that project-specific impacts relative to VMT would be significant and unavoidable, the project’s contribution to VMT generation in the region is considered cumulatively considerable.
2263
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 43 Mitigation Measures
No feasible mitigation measures are available.

Finding
The City hereby finds that the project’s contribution to a direct or indirect cumulative effect related to transportation, when considered with other past, present, or reasonably foreseeable future projects, would remain significant and unavoidable. As feasible mitigation measures are not available that would fully mitigate the project’s contribution to a cumulative impact to a less than significant level, a Statement of Overriding Considerations is included herein.

B. Growth-Inducing Impacts
CEQA Guidelines Section 15126.2(e) requires that an EIR discuss a project’s potential to foster economic or population growth, or the construction of additional housing, either directly or indirectly, in the surrounding environment. The CEQA Guidelines also indicate that it must not be assumed that growth in any area is necessarily beneficial, detrimental, or of little significance to the environment. This section analyzes such potential growth-inducing impacts, based on criteria suggested in the CEQA Guidelines.

In general terms, a project may foster spatial, economic, or population growth in a geographic area if it meets any one of the following criteria:
• Removes an impediment to growth (e.g., establishes an essential public service or provides new access to an area)
• Fosters economic expansion or growth (e.g., changes revenue base, expands employment)
• Fosters population growth (e.g., constructs additional housing), either directly or indirectly
• Establishes a precedent-setting action (e.g., an innovation, a change in zoning, or a general plan amendment approval)
• Develops or encroaches on an isolated or adjacent area of open space (distinct from an infill type of project)
Should a project meet any one of the above-listed criteria, it may be considered growth inducing.

The potential growth-inducing impacts of the proposed project are evaluated against these five criteria in this section.

CEQA Guidelines Section 15126.2(e) requires that an EIR “discuss the ways” a project could be growth inducing and “discuss the characteristic of some projects which may encourage and facilitate other activities that could significantly affect the environment, either individually or cumulatively.” However, the CEQA Guidelines do not require that an EIR predict (or speculate) 2264
Eastvale 2040 General Plan Update
Page | 44 CEQA Findings of Fact and Statement of Overriding Considerations specifically where such growth would occur, in what form it would occur, or when it would occur.

The answers to such questions require speculation, which CEQA discourages (see CEQA Guidelines Section 15145).

REMOVAL OF A BARRIER TO GROWTH
Several types of projects can induce population growth by removing obstacles that prevent growth. An example would be the expansion of a wastewater treatment plant which would accommodate additional sewer connections within a service area and therefore would allow for future construction and growth that may not have otherwise been feasible.

Future development anticipated by the proposed Eastvale 2040 General Plan would increase demands for public services (i.e., fire and police protection, schools, parks and recreational facilities, and libraries) and utility and service systems (water, wastewater, solid waste, and energy and telecommunications infrastructure). The Planning Area is already served by essential public services and utilities. Future individual development projects would negotiate cooperative agreements between service agencies/utility providers to address the development’s incremental increased demands on public services and utilities. The Land Use Plan has been designed to focus growth in key areas of the City to take advantage of the City’s existing network of public services and utilities and service systems, including fire, police, water, wastewater, and solid waste services. Because the growth is directed to areas already developed, it is not anticipated that major new infrastructure will be needed. Thus, implementation of the proposed project would not result in a removal of an impediment to growth by establishing an essential public service or utility or service system.

Regional access to the City is provided via Interstate 15 (I-15) and State Route (SR-60). Local access is provided by various arterial roadways that intersect the Planning Area, including Archibald Avenue, Sumner Avenue, Hamner Avenue, Limonite Avenue, and Schleisman Road.

Future roadway improvements would not provide new access to any portion of the Planning Area since both regional and local access is already provided by an existing roadway network.

Therefore, implementation of the proposed Eastvale 2040 General Plan would not remove an existing impediment to growth through the provision of new access to an area.

ECONOMIC GROWTH
The timing, magnitude, and location of land development and population growth in a community or region are based on various interrelated land use and economic variables. Key variables include regional economic trends, market demand for residential and nonresidential uses, land availability and cost, the availability and quality of transportation facilities and public services, proximity to employment centers, the supply and cost of housing, and/or regulatory policies or conditions.
2265
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 45 Construction activities associated with future site-specific development proposals would generate new design, engineering, and construction jobs. Construction employees would likely be absorbed from the regional labor force, and individual development proposals would not attract new workers to the region.

As concluded in the EIR, based on the amount of feasible development in the foreseeable future (i.e., development through 2040), Eastvale 2040 General Plan implementation would not directly induce substantial unplanned population growth in an area by proposing new businesses. Thus, although economic growth could occur within the project area due to project implementation, future economic effects are not expected to significantly affect the environment.

POPULATION GROWTH
A project could induce population growth in an area either directly or indirectly. More specifically, the development of new residences or businesses could induce population growth directly, whereas the extension of roads or other infrastructure could induce population growth indirectly. As noted in the “Removal of a Barrier to Growth” section above, the project would not indirectly induce substantial population growth through extension of roads or other infrastructure.

As analyzed in the EIR, the project would not induce substantial unplanned population growth, either directly or indirectly, in the project area. Thus, growth inducing impacts related to population growth would be less than significant.

ESTABLISHMENT OF A PRECEDENT SETTING ACTION
The Eastvale 2040 General Plan is long-term planning document that proposes a series of land use changes and policy updates. Future development anticipated through project implementation could involve as many as 4,173 dwelling units and approximately 6,999,959 square feet of non-residential uses over existing conditions. However, all future land uses within the City would be developed pursuant to the Land Use Map, Zoning Map, and goals and policies recommended under the proposed Eastvale 2040 General Plan. Implementation of the proposed project would not establish a procedure that would make future re-designations and/or rezones easier and would be speculative to determine any such effect. As such, the proposed project would not involve a precedent-setting action that could significantly affect the environment.

DEVELOPMENT OR ENCROACHMENT ON OPEN SPACE
As noted in the EIR, the City of Eastvale is generally a highly developed area with limited natural open space. The most prominent natural resource within the City is the Santa Ana River and surrounding riparian and woodland habitat. The Santa Ana River forms the southern boundary of Eastvale and is an important local and regional open space resource. Buildout of the proposed Eastvale 2040 General Plan would concentrate development in areas that are already characterized by existing development, thus reducing development pressures on open space 2266
Eastvale 2040 General Plan Update
Page | 46 CEQA Findings of Fact and Statement of Overriding Considerations areas that have a greater likelihood of supporting sensitive or protected species of wildlife and plants. Additionally, the Eastvale 2040 General Plan would designate 1,547.2 acres of land within the City as Open Space, including 1,231.1 acres specifically designated as Riverfront Policy Area, resulting in an increase of 1,515.1 acres of Conservation, Open Space, and Water designations.

The Riverfront Policy Area would provide for conservation of natural resource areas including watersheds, habitat areas and corridors, and areas within flood zones. This category has been applied to the Santa Ana River watershed, associated habitat areas, and parcels prone to flooding and owned by the Flood Control District. Therefore, future development in accordance with the proposed project would not develop or encroach on an isolated or adjacent area of open space, resulting in a growth inducing impact. No impact would occur.

FINDING
As stated, the proposed project would accommodate future, planned development of up to 4,173 dwelling units and approximately 7 million square feet of non-residential uses over existing conditions with buildout of the General Plan occurring in the year 2040. All future land uses within the City would be developed pursuant to the Land Use Map, Zoning Map, and goals and policies recommended under the proposed Eastvale 2040 General Plan. As analyzed in the EIR, the project would not induce substantial unplanned population growth, either directly or indirectly, in the project area. Further, the proposed project would not result in a significant growth inducing impact as all environmental impacts were determined to be less than significant with exception of significant and unavoidable impacts associated with air quality, land use and planning, and transportation. The City finds, on the basis of the entire record, that the project would not remove an impediment to growth, induce substantial unplanned population growth, induce economic growth that would significantly affect the environment, establish a precedentsetting action, or develop or encroach on an isolated or adjacent area of open space. Therefore, no growth-related impacts beyond the environmental impacts discussed in the EIR are anticipated.

C. Significant and Irreversible Environmental Changes
Section 15126.2(d) of the CEQA Guidelines requires an EIR to discuss the significant irreversible environmental changes that would result from implementation of a proposed project. Examples include a project’s primary or secondary impacts that would generally commit future generations to similar uses (e.g., highway improvements at the access point); uses of nonrenewable resources during the initial and continued phases of the project (because a large commitment of such resources make removal or nonuse thereafter unlikely); and/or irreversible damage that could result from any potential environmental accidents associated with the project.

The physical effects of project implementation on the environment are addressed in Sections 3.1 to 3.13 and Section 4.0 of the EIR. Future development associated with implementation of the Eastvale 2040 General Plan would consume limited, slowly renewable, and nonrenewable 2267
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 47 resources. This consumption would occur during the construction phase of the project and would continue throughout its operational lifetime. Although site-specific development proposals are not available at this time, it can be assumed that future development would require a commitment of resources that would include: (1) building materials, (2) fuel and operational materials/resources, and (3) the transportation of goods and people to and from the project site.

Construction activities would require the consumption of resources that are not renewable, or which may renew so slowly as to be considered non-renewable. These resources would include construction supplies, such as aggregate materials used in concrete and asphalt, metals, and water. Fossil fuels such as gasoline and oil would also be consumed in the use of construction vehicles and equipment.

The resources that would be committed during future operational activities associated with buildout of the Eastvale 2040 General Plan would include energy resources such as electricity and natural gas, petroleum-based fuels required for vehicle trips, fossil fuels, and water. Fossil fuels would represent the primary energy source associated with both construction and ongoing operation of the project and the existing, finite supplies of these natural resources would be incrementally reduced. Site-specific development proposals accommodated by implementation of the Eastvale 2040 General Plan would occur in accordance with California Code of Regulations Title 24, Part 6, which sets forth conservation practices that would limit the amount of energy consumed by the project. However, the energy requirements associated with the project would, nonetheless, represent a long-term commitment of essentially non-renewable resources.

FINDING
Future construction and operation activities associated with buildout of the Eastvale 2040 General Plan would result in the irretrievable commitment of limited, slowly renewable, and nonrenewable resources, which would limit the availability of these particular resource quantities for future generations or for other uses during the life of the project. The project would involve the use of building materials and energy, some of which are non-renewable resources.

However, consumption of these resources would occur with any development in the region and are not unique to the project. Additionally, increasingly efficient building fixtures, construction practices/materials, and vehicular engines are expected to offset this demand as future development occurs over time. Thus, although irreversible environmental changes would result from the project, such changes would not be considered significant.

D. Alternatives
Section 15126.6(a) of the CEQA Guidelines requires that an EIR describe a range of reasonable alternatives to the project, or a range of reasonable alternatives to the location of the project, that could feasibly attain the basic objectives of the project. An EIR does not need to consider every conceivable alternative project, but it does have to consider a range of potentially feasible alternatives that will facilitate informed decision-making and public participation. 2268
Eastvale 2040 General Plan Update
Page | 48 CEQA Findings of Fact and Statement of Overriding Considerations According to CEQA Guidelines Section 15126.6(a), the discussion of alternatives must focus on alternatives to the project, or to the project location, which would avoid or substantially reduce the severity of any significant project effects, even if the alternatives would be costlier or hinder to some degree the attainment of the project objectives. The “No Project” alternative must also be evaluated. The “No Project” analysis must discuss the existing conditions and what would reasonably be expected to occur in the foreseeable future if the proposed project was not approved. The range of alternatives required is governed by a “rule of reason.” Therefore, the EIR must only evaluate those alternatives necessary to permit a reasoned choice. The alternatives must be limited to only ones that would avoid or substantially decrease the severity of the impacts identified for the proposed project.

Additionally, an EIR should not consider an alternative whose effects cannot be reasonably ascertained and whose implementation is remote and speculative. The CEQA Guidelines also require an EIR to state why an alternative is being rejected. If the City ultimately rejects any or all alternatives, the rationale for rejection will be presented in the findings that are required before the City certifies the EIR and acts on the proposed project. According to Section 15126.6(f)(1) of the CEQA Guidelines, among the factors that may be taken into account when addressing feasibility of alternatives are environmental impacts, site suitability, economic viability, availability of infrastructure, policy preferences, regulatory limitations, jurisdictional boundaries, and whether an applicant could reasonably acquire, control, or otherwise have access to an alternate site.

The project alternatives are evaluated to determine the extent to which they attain the basic project objectives, while significantly decreasing the severity of or avoiding significant effects of the proposed project.

The City’s objectives for the Eastvale 2040 General Plan are the following:
• Direct future growth in designated focus areas in a manner which preserves existing neighborhoods, enhances quality of life, and maintains a balance of land uses which benefits residents and businesses
• Preserve Eastvale’s suburban character and promote development that embraces the City’s diversity, history, and sense of community
• Enhance and activate public/quasi-public land uses, including resources unique to the City of Eastvale such as the Santa Ana Riverfront
• Create a sustainable multi-modal transportation network that includes walkable, bicycle friendly environments
• Increase residential development potential to meet regional housing needs 2269
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 49 • Promote a variety of housing choices to achieve the City’s 6th Cycle Regional Housing Needs Assessment housing goals
• Implement new California State law General Plan requirements The CEQA Guidelines (Section 15126.6(e)(2)) require that the alternatives discussion include an analysis of the “No Project” Alternative. Consistent with the requirements of the applicable CEQA Guidelines, the EIR analyzed potential environmental impacts associated with the required “No Project” alternative, as well as other alternatives, to compare the resulting impacts to those anticipated to result with the project as proposed. The alternatives analyzed include:
• Alternative 1: No Project/Existing General Plan Alternative • Alternative 2: Dispersed Development Alternative
ALTERNATIVE 1: NO PROJECT/EXISTING GENERAL PLAN ALTERNATIVE Description of Alternatives
The No Project/Existing General Plan Alternative is required to discuss the existing conditions at the time the notice of preparation is published and evaluate what would reasonably be expected to occur in the foreseeable future if the proposed project is not approved (CEQA Guidelines, Section 15126.6(e)). Pursuant to CEQA, this alternative is also based on current plans and consistent with available infrastructure and community services. Therefore, the No Project/Existing General Plan Alternative assumes that the Eastvale 2040 General Plan would not be adopted, and the land uses and development intensity assumed in the existing 2012 General Plan would be followed.

Impact Comparison
Air Quality
The No Project/Existing General Plan Alternative would reduce the amount of future development as compared to that which would occur under the Eastvale 2040 General Plan.

During construction of future development under the current General Plan, regional and localized emissions could still exceed the South Coast Air Management District (SCAQMD) daily significance thresholds, resulting in significant and unavoidable impacts regarding consistency with the air quality management plan (AQMP), exposure of sensitive receptors to substantial pollutant concentrations, and a cumulatively considerable net increase of pollutants for which the project region is in non-attainment. Therefore, air quality impacts under Alternative 1 during construction of future development projects would be significant and unavoidable, similar to the Eastvale 2040 General Plan.

New development allowed under the current General Plan would be less than that allowed under the buildout of the Eastvale 2040 General Plan. However, unlike the proposed project, this alternative would not focus higher density development in specific areas of the City, with 2270
Eastvale 2040 General Plan Update
Page | 50 CEQA Findings of Fact and Statement of Overriding Considerations improved access to nearby transit as well as goods, services, and jobs which could potentially reduce vehicle trip length and associated mobile emissions. Similar to the Eastvale 2040 General Plan, the current General Plan identifies goals and policies aimed at achieving air quality that promotes health and wellness of residents and reducing mobile and stationary emission sources.

As with Eastvale 2040, given the volume of air pollutants attributable to buildout of the planning area, impacts related to operational emissions under the No Project/Existing General Plan Alternative are considered significant and unavoidable, although the severity of such impacts would be increased as compared to those resulting with the Eastvale 2040 General Plan.

Land Use and Planning
The No Project/Existing General Plan Alternative would not meet the goals of the 2022-2045 Regional Transportation Plan/Sustainable Community Strategy (2022-2045 RTP/SCS) as well as the proposed project. For example, the benefits of directing future growth in designated policy areas in a manner which preserves existing neighborhoods, enhances quality of life, and maintains a balance of land uses which benefits residents and businesses, would not occur under this alternative. The Existing General Plan proposes less mixed and high density uses and does not propose a better connection between employment and residential uses. Therefore, as the Existing General Plan would not emphasize land use patterns that facilitate multimodal access to work, educational, and other destinations, the No Project/Existing General Plan Alternative would not meet the goals of the 2022-2045 RTP/SCS as well as the proposed project.

Like the proposed project, the No Project/Existing General Plan Alternative is not anticipated to divide an established community. As projections associated with the Existing General Plan are currently included in the 2022 AQMP, impacts due to a conflict with the AQMP would be less than significant, and the project’s significant and unavoidable land use impact would be avoided under this alternative.

Transportation
Implementation of Eastvale 2040 would result in significant and unavoidable transportation impacts related to VMT. For the Eastvale 2040 General Plan, both the VMT per capita and the VMT per employee are well above the Countywide average for year 2045, but are a reduction over the existing conditions, indicating the land uses planned in the City align with the regional goal of reducing VMT. Under the Eastvale 2040 General Plan, an increase in Citywide population and a decrease in employees would occur. As a result, Homebased VMT (productions) would increase and Homebased Work VMT (attractions) would decrease. Evaluating the residential VMT metric, the Eastvale 2040 VMT per capita would decrease compared to the current 2012 General Plan. For the employment metric, Eastvale 2040 would result in a decrease, but the decrease would be less than that previously forecast for the current 2012 General Plan.

Under this alternative, development would occur within the City boundaries as permitted by the current 2012 General Plan. Buildout under Alternative 1 would be at or below buildout scenarios 2271
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 51 considered for the Eastvale 2040 General Plan. Given the pattern of increasing VMT impacts as buildout projections decrease, this alternative would increase the severity of significant VMT impacts as compared to the project as proposed, due to the conditions discussed above. Impacts would remain significant and unavoidable, similar to the proposed project.

Alternative 1 Summary and Finding
The City finds that implementation of Alternative 1, No Project/Existing General Plan Alternative, would not reduce potential environmental impacts when compared to the proposed project.

Impacts to air quality, land use and planning, and transportation would remain significant and unavoidable and would be more severe as compared to the project relative to air quality and transportation. Impacts relative to land use and planning would be less severe, but would remain significant and unavoidable, and therefore would not be avoided. Additionally, as Alternative 1 assumes that the Eastvale 2040 General Plan would not be adopted, and the land uses and development intensity assumed in the existing 2012 General Plan would be followed, Alternative 1 would not achieve the basic objectives identified for the proposed project., For the reasons provided herein, the City rejects Alternative 1.

ALTERNATIVE 2: DISPERSED DEVELOPMENT ALTERNATIVE
Description of Alternative
Under the Eastvale 2040 General Plan, new development would be focused in areas that are either vacant or located in suitable areas with existing land uses and infrastructure that can support more intensive development. This alternative was chosen to provide a counterpoint to the design approach taken in the proposed Eastvale 2040 plan. Rather than emphasizing growth in the identified policy areas, the Dispersed Development Alternative would redistribute density throughout the City. Some of this future growth would occur on the limited available vacant land within the City boundaries. The remainder would occur by changing the existing density/intensity of the assigned land use designation(s).

It is anticipated that buildout of the Dispersed Development Alternative would be within the range of the buildout scenario considered under the Eastvale 2040 General Plan. As this alternative would not focus new development near major transportation corridors or hubs that either have transit or will have transit, the ability to protect the established suburban neighborhoods from substantial growth and to achieve a sustainable multi-modal transportation network that includes walkable, bicycle-friendly environments would be substantially lessened.

Implementing the Dispersed Development Alternative may also result in the need to revise the General Plan Housing Element to ensure that regional housing needs assessment (RHNA) can still be met, thereby requiring a somewhat lengthy process for State and local approvals. Such land use and zoning changes would be required to revise existing density ranges throughout the City and lower density at the policy areas as compared to the Eastvale 2040 General Plan. 2272
Eastvale 2040 General Plan Update
Page | 52 CEQA Findings of Fact and Statement of Overriding Considerations Impact Comparison
Air Quality
As stated, the Dispersed Development Alternative would redistribute density throughout the City, outside of the policy areas planned with Eastvale 2040. It is anticipated that buildout of the Dispersed Development Alternative would be within the range of the buildout scenario considered under the Eastvale 2040 General Plan, and therefore, short-term construction related impacts on air quality are similar. During construction of future development, regional and localized emissions could still exceed the SCAQMD significance thresholds, resulting in significant and unavoidable impacts regarding consistency with the AQMP, exposure of sensitive receptors to substantial pollutant concentrations, and a cumulatively considerable net increase of pollutants for which the project region is in non-attainment.

As construction activities could occur close to existing sensitive receptors, construction emissions generated by future development projects that are larger than the representative projects considered with the Eastvale 2040 General Plan would have the potential to exceed SCAQMD LSTs and it cannot be determined with certainty that conformance with applicable regulations or implementation of feasible mitigation would reduce impacts below SCAQMD’s thresholds in all cases. Therefore, construction impacts under this alternative would be significant and unavoidable, similar to the Eastvale 2040 General Plan.

By dispersing development throughout the City, rather than in focused areas that would allow for proximity to transit, services, and goods, it is anticipated that this alternative would increase the severity of operational impacts on air quality as longer vehicle trips would be required. Similar to the proposed project, although impacts related to exceedance of established air quality standards could be reduced through conformance with applicable SCAQMD rules and regulations and goals and policies identified in the City’s General Plan, impacts would remain significant and unavoidable. However, due to the development pattern anticipated, the severity of operational impacts related to air quality would increase with this alternative as compared to that which would occur under implementation of Eastvale 2040.

Additionally, the Eastvale 2040 General Plan would accommodate more residential units than the existing 2012 General Plan and the SCAQMD has not yet incorporated these projections into the current AQMP. As projections associated with Eastvale 2040 are not included in the current AQMP, the proposed project would not meet this criterion, and the impact would be potentially significant; a similar significant and unavoidable impact would occur with the Dispersed Development Alternative.

The proposed project would be inconsistent with the SCAQMD AQMP as buildout of the Eastvale 2040 General Plan could exceed current SCAG population and employment estimates and would contribute to the nonattainment designations of the air quality basin. Conformance with local, State, and Federal regulations during construction and operation would contribute to reduced 2273
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 53 criteria air pollutant emissions associated with buildout of the proposed project and/or this alternative. In addition, goals and policies included in the Eastvale 2040 General Plan would promote increased capacity for alternative transportation modes and implementation of transportation demand management strategies.

However, since implementation of the proposed project would introduce land use intensification in certain portions of the planning area, no feasible mitigation measures are available that would reduce total air quality emissions from buildout of the Eastvale 2040 General Plan to a less than significant level. In addition, the population and employment assumptions of the AQMP would still be exceeded until such time the AQMP is revised and incorporates updated projections that consider Eastvale 2040. Therefore, air quality impacts related to implementation of the AQMP would remain significant and unavoidable. Similar impacts would result with the Dispersed Development Alternative.

Land Use and Planning
The Dispersed Development Alternative would not meet the goals of the 2022-2045 RTP/SCS as well as the proposed project. For example, the benefits of directing future growth in designated policy areas in a manner which preserves existing neighborhoods, enhances quality of life, and maintains a balance of land uses which benefits residents and businesses, would not occur under this alternative. This alternative does not propose a better connection between employment and residential uses and would not focus growth near destinations and mobility options.

Like the proposed project, the Dispersed Development Alternative is not anticipated to divide an established community. In addition, the population and employment assumptions of the AQMP would still be exceeded until such time the AQMP is revised and incorporates updated projections that consider Eastvale 2040. Therefore, air quality impacts related to implementation of the AQMP would remain significant and unavoidable.

Transportation
Buildout of the Dispersed Development Alternative would be within the range of the buildout scenario considered under the Eastvale 2040 General Plan. As discussed in Section 3.11, Transportation, of the EIR, Eastvale 2040 would result in significant and unavoidable transportation impacts related to VMT. For the Eastvale 2040 General Plan, both the VMT per capita and the VMT per employee are well above the Countywide average for year 2045, but are a reduction over the existing conditions, indicating the land uses planned in the City align with the regional goal of reducing VMT. Under Eastvale 2040, an increase in Citywide population and a reduction in employees would occur. The Homebased VMT (productions) would increase and Homebased Work VMT (attractions) would decrease as a result. Evaluating the residential VMT metric, the Eastvale 2040 VMT per capita would decrease compared to the current 2012 General Plan. For the employment metric, Eastvale 2040 would result in a decrease, but the decrease would be less than that previously forecast for the current 2012 General Plan. 2274
Eastvale 2040 General Plan Update
Page | 54 CEQA Findings of Fact and Statement of Overriding Considerations By dispersing development throughout the City, this alternative would result in an increase in VMT, as people would need to travel greater distances to obtain goods, services, and to access public transit. Such conditions would be anticipated to lead to substantive change in the affected neighborhoods, with residents not being able to take advantage of existing and planned transit as they would under the Eastvale 2040 General Plan. Implementing this alternative would evenly distribute growth throughout the City, thereby minimizing localized impacts on roadways.

However, doing so would be anticipated to result in increased VMT as it would be more difficult to justify any changes to existing bus routes, as fewer riders would be available to serve at each mobility hub. As a result of increased personal vehicle trips, greater energy use and increased vehicle emissions would also result. For these reasons, this alternative would increase the severity of VMT-related significant and unavoidable impacts as compared to that which would occur under the Eastvale 2040 General Plan.

Alternative 2 Summary and Finding
The Dispersed Development Alternative would meet the majority of the project objectives, including fulfilling the City’s 6th Cycle Regional Housing Needs Assessment housing goals by increasing the residential development potential in the project area by 4,173 dwelling units through redesignating land uses through 2040; promoting a variety of housing choices to achieve the City’s 6th Cycle Regional Housing Needs Assessment housing goals; and implementing new California State law General Plan requirements. This alternative would also achieve the objectives of enhancing and activating public/quasi-public land uses, including resources unique to the City of Eastvale such as the Santa Ana Riverfront; and creating a sustainable multi-modal transportation network that includes walkable, bicycle-friendly environments, but to a lesser degree than would the proposed project.

However, as compared to the proposed project, the Dispersed Development Alternative would not avoid the significant and unavoidable impacts identified from implementation of the proposed project. Significant and unavoidable impacts relative to land use and planning would be similar to the proposed project and would therefore remain. However, significant and unavoidable impacts relative to relative to air quality and transportation would increase in severity with the Dispersed Development Alternative. For the reasons provided herein, the City rejects this alternative.

ENVIRONMENTALLY SUPERIOR ALTERNATIVE
CEQA requires that an environmentally superior alternative be identified; that is, an alternative that would result in the fewest or least significant environmental impacts. If the No Project Alternative is the environmentally superior alternative, CEQA Guidelines Section 15126.6(e)(2) requires that another alternative that could feasibly attain most of the project’s basic objectives be chosen as the environmentally superior alternative.
2275
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 55 The No Project/Existing General Plan Alternative is the environmentally superior alternative.

However, in accordance with CEQA Guidelines Section 15126.6(e)(2), a secondary alternative must be chosen since the No Project Alternative is environmentally superior. Therefore, Alternative 2, the Dispersed Development Alternative, is considered the environmentally superior alternative.

As indicated, the Dispersed Development Alternative would meet the majority of the project objectives, including fulfilling the City’s 6th Cycle Regional Housing Needs Assessment housing goals by increasing the residential development potential in the project area by 4,173 dwelling units through redesignating land uses through 2040; promoting a variety of housing choices to achieve the City’s 6th Cycle Regional Housing Needs Assessment housing goals; and implementing new California State law General Plan requirements. This alternative would also achieve the objectives of enhancing and activating public/quasi-public land uses, including resources unique to the City of Eastvale such as the Santa Ana Riverfront; and creating a sustainable multi-modal transportation network that includes walkable, bicycle-friendly environments, but to a lesser degree than would the proposed project.

As described above, the Dispersed Development Alternative would result in similar significant and unavoidable land use and planning impacts as compared to the proposed project. However, the severity of significant and unavoidable impacts relative to air quality and transportation would increase.
2276
Eastvale 2040 General Plan Update
Page | 56 CEQA Findings of Fact and Statement of Overriding Considerations VI. STATEMENT OF OVERRIDING CONSIDERATIONS
Pursuant to PRC Section 21081(b) and State CEQA Guidelines Section 15093(a) and (b), the City Council is required to balance, as applicable, the economic, legal, social, technological, or other benefits, including regionwide or statewide environmental benefits, of a proposed project against its unavoidable environmental risks when determining whether to approve the project.

If the specific economic, legal, social, technological, or other benefits of the project, including regionwide or statewide environmental benefits, outweigh the unavoidable adverse environmental effects, those effects may be considered “acceptable” (CEQA Guidelines Section 15093[a]). CEQA requires the agency to support, in writing, the specific reasons for considering a project acceptable when significant impacts are not avoided or the severity of the impacts are not substantially decreased. Those reasons must be based on substantial evidence in the Final EIR or elsewhere in the administrative record (CEQA Guidelines Section 15093[b]).

In accordance with the requirements of CEQA and the State CEQA Guidelines, the City Council finds that there are no feasible mitigation measures, as identified in the Final EIR, that would avoid or substantially decrease the severity of the potentially significant environmental impacts resulting from the proposed project. As a result, project implementation would result in significant and unavoidable impacts to air quality, land use and planning, and transportation.

The City considered project alternatives in the EIR aimed at reducing the project’s significant and unavoidable impacts relative to air quality, land use and planning, and transportation. A total of six project alternatives were identified, consistent with CEQA Guidelines Section 15126.6(a), which requires that an EIR describe a reasonable range of project alternatives that could feasibly attain the basic project objectives while avoiding or reducing significant environmental impacts associated with the project.

Two project alternatives identified were evaluated for potential environmental effects. Four project alternatives were considered and subsequently rejected from further evaluation because they did not meet the project objectives while avoiding or substantially decreasing the severity of significant impacts resulting from project implementation. The project alternatives identified are consistent with CEQA Guidelines Section 15126.6(a), requiring that the discussion of alternatives focus on alternatives to the project, or to the project location, which would avoid or substantially decrease the severity of any significant project effects, even if the alternatives would be costlier or hinder to some degree the attainment of the project objectives.

In evaluating the alternatives identified, Alternative 1, No Project/No Development Alternative, was determined to result in a significant and unavoidable impact relative to air quality, land use and planning, and transportation. Significant and unavoidable impacts relative to air quality would be to a lesser degree than the proposed project but would nevertheless remain.

Additionally, as Alternative 1 assumes that the Eastvale 2040 General Plan would not be adopted, and the land uses and development intensity assumed in the existing 2012 General Plan would 2277
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 57 be followed, Alternative 1 would not achieve the basic objectives identified for the proposed project.

Alternative 2, the Dispersed Development Alternative, meets the basic project objectives, but was found to have significant and unavoidable impacts relative to air quality, land use and planning, and transportation, with air quality and transportation impacts being more severe.

The EIR considered and rejected from further consideration other project alternatives aimed at reducing impacts identified from implementation of the proposed project. These alternatives included the Development of the Citrus Policy Area Alternative; Add Residential to NonResidential Uses Alternative; Annexation Alternative; and Redesignating Existing Neighborhoods Alternative, all of which are briefly summarized below.

Under the Development of the Citrus Policy Area Alternative, the Citrus Policy Area would be removed from the floodplain, allowing for more intense residential or mixed-use development to occur. As the site is currently located within an area subject to the 100-year flood event, avoiding this restriction would involve grading techniques to raise the elevation of the site to above potential flood levels, which would require Federal Emergency Management Agency approval of a Letter of Map Revision.

With removal of the potential risk for flooding to occur, the site could be developed with residential housing units, thereby offering a unique setting within proximity to the river, thereby improving access to the resource and activating the space. Alternatively, the site could also support mixed-use development, thereby providing a commercial connection to both the surrounding neighborhood and visitors to the adjacent regional commercial recreational facility, while enhancing pedestrian movement and connectivity. However, as the area is currently a regional park enjoyed for public use, implementing the Citrus Policy Area Alternative would require that the size of the existing park be reduced to accommodate the intended residential development. Thus, this alternative would reduce lands currently available for public recreation.

The Development of the Citrus Policy Area Alternative would achieve the project objective to enhance and activate public/quasi-public land uses, including resources unique to Eastvale such as the Santa Ana Riverfront, to a lesser degree than would the proposed project, as it would remove recreational lands from public use. Further, the requirement to raise the site above hazardous flood levels would require extensive and costly engineering and design efforts. Such activities may also have the potential to lead to adverse environmental effects pertaining to air quality emissions and noise from construction, hydrology and water quality, noise, and biological and cultural resources, among other issues, due to the degree of site disturbance required. For these reasons, this alternative was rejected from further consideration in the EIR.

The EIR also considered an Add Residential to Non-Residential Uses Alternative. While the majority of planned non-residential land located in the City lies within the influence area of the 2278
Eastvale 2040 General Plan Update
Page | 58 CEQA Findings of Fact and Statement of Overriding Considerations Chino Airport, other lands are available where residential, professional office, and mixed-use development could be introduced. The Add Residential to Non-Residential Uses Alternative would allow for incorporation of residential land uses on such lands to increase available housing, while still accommodating commercial or retail uses. To achieve this alternative, some existing land use designations would be changed to encourage more mixed-use development to occur (for example, near the existing Costco site).

Implementation of this alternative would also rely on provisions identified in recent legislation, including Assembly Bill (AB) 2011, the Affordable Housing and High Road Jobs Act of 2022, and Senate Bill (SB) 6, the Middle Class Housing Act of 2022, which are intended to permit residential development on sites zoned and designated for commercial or retail uses. Such allowances encourage the development of new affordable housing units without also causing effects on the density or character of existing residential neighborhoods. Specifically, AB 2011 allows for ministerial, by-right approval for affordable housing on commercially zoned lands. By-right approval is similarly allowed for mixed-income housing located along commercial corridors if such development meets specific criteria aimed at affordability, labor, and environmental protection. Further, SB 6 allows residential development on commercially zoned property without requiring a rezone, wherein the applicant is required to commit to payment of prevailing wages for construction workers and to "skilled and trained workforce" requirements. However, SB 6 does not provide by-right approval.

The Add Residential to Non-Residential Uses Alternative would not meet the basic project objectives of directing future growth in designated policy areas in a manner which preserves existing neighborhoods, enhances quality of life, and maintains a balance of land uses which benefits residents and businesses; enhancing and activating public/quasi-public land uses, including resources unique to Eastvale such as the Santa Ana Riverfront; or creating a sustainable multi-modal transportation network that includes walkable, bicycle-friendly environments. This alternative would increase the severity of impacts relative to air quality, energy and greenhouse gases, and transportation, as compared to the proposed project, largely due to operational effects of allowing for dispersed development, rather than development that is focused in specific areas with access to goods, services, and public transit to reduce vehicle trips. Therefore, the Add Residential to Non-Residential Uses Alternative was rejected from further analysis in the EIR.

The Annexation Alternative was also considered to evaluate the option for the City to expand its existing boundary by annexing new land in the vicinity to accommodate additional future growth.

The City is largely built out under existing conditions and is surrounded by established incorporated cities such as Norco, Ontario, Jurupa Valley, and Chino. No unincorporated land, with the exception of a small amount of flood control land that cannot be developed, is available in the surrounding area. Therefore, expanding the City’s existing boundaries to provide new land 2279
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 59 for future development opportunities is not a viable option. Accordingly, the Annexation Alternative was rejected from further analysis in the EIR.

As the City is largely built out under existing conditions, the EIR also considered evaluation of the Redesignating Existing Neighborhoods Alternative to encourage continued new growth with the City undertaking substantive changes to planned future development patterns. This alternative would require the City to redesignate the land use of existing neighborhoods to allow for increased density of units or to change the land use to allow for professional offices and similar service land uses, thereby allowing for a greater intensity of uses, as compared to that currently planned for future buildout of the 2012 General Plan. Such actions would likely result in a substantial increase in the number of single- and multi-family housing units that would be available, while also enhancing future opportunities for mixed-use, businesses, industries, and other related development.

Because many of the neighborhoods in Eastvale are relatively new construction, the opportunity for redesignation to alternative land uses is limited and is not supported by residents. Although the Redesignating Existing Neighborhoods Alternative could allow for increased density/intensity of new growth within the City, it would not meet the basic project objectives of directing future growth in designated policy areas in a manner that preserves existing neighborhoods, enhances quality of life, and maintains a balance of land uses which benefits residents and businesses; or preserving Eastvale’s suburban character and promoting development that embraces the City’s diversity, history, and sense of community. This alternative is also likely to result in land use conflicts and associated significant impacts related to air quality, noise, and transportation. For these reasons, this alternative was rejected from further analysis in the EIR. Therefore, the City finds that, having reduced the adverse significant environmental effects of the project to the fullest extent feasible as evaluated in the EIR; having considered the entire administrative record on the project; and having weighed the benefits of the project against its unavoidable adverse impacts, each of the social, economic, environmental, and other benefits of the project— including helping to meet the State-mandated affordable housing requirements and further encourage diversity within the community—have been determined to separately and individually outweigh the potential unavoidable adverse impacts and render those potential adverse environmental impacts acceptable, based upon the following overriding considerations:

A. Social Benefits
The project would aid in preserving Eastvale’s suburban character and residential neighborhoods and promoting development that embraces the City’s diversity, history, and sense of community through sensitive land use planning.

The project would provide a plan that supports connectivity of neighborhoods and access to public transit while promoting the use of alternative means of transportation such as pedestrian and bicycle transit.
2280
Eastvale 2040 General Plan Update
Page | 60 CEQA Findings of Fact and Statement of Overriding Considerations The project would enhance the Santa Ana River with more trails, recreational opportunities and rewilding to expand recreational activities, river access, and improve the quality of the riparian area along the Santa Ana River.

The project would provide opportunities to implement a trail system linking various uses via a River Trail, thus enhancing circulation along and access to the Santa Ana River as well as creation of a “grand park.”
B. Economic Benefits
The project would provide anticipated growth over existing (2022) conditions of 4,173 additional dwelling units and 6,999,959 additional square feet of non-residential uses based upon historical development, thereby generating new housing opportunities and other tax revenue-generating land uses within the City.

The project would provide additional new residential housing opportunities within the Eastvale community, thereby addressing the local and State housing crisis and helping to meet regional and local housing mandates, including the City’s 6th Cycle Regional Housing Needs Assessment housing goals.

The project would provide for diversified housing to meet current and future housing demands in areas located near available transit, retail, and recreational amenities, as available.

C. Environmental Benefits
The project would provide at least the minimum number of units and housing opportunities that are consistent with the goals of the adopted City of Eastvale General Plan Housing Element, while minimizing environmental effects and protecting surrounding natural and aesthetic resources.

The project would provide for a multimodal transportation network that would help to reduce greenhouse gas emissions through reduced dependency on the automobile and enhanced alternative modes of transportation.

The project would allow for protection of the Santa Ana River as a valuable community and natural resource, while providing for additional open space recreational area and floodplain management.

Accordingly, the City of Eastvale adopts the Statement of Overriding Considerations, recognizing that significant and unavoidable impacts related to air quality, land use and planning, and transportation would result from implementation of the project. Having (1) determined that the alternatives evaluated in the EIR either would not avoid or substantially decrease the severity of 2281
Eastvale 2040 General Plan Update
CEQA Findings of Fact and Statement of Overriding Considerations Page | 61 the significant and unavoidable transportation impact or would be infeasible; and (2) recognized all unavoidable significant impacts, the City of Eastvale hereby finds that each of the separate benefits of the project, as stated herein, is determined to be unto itself an overriding consideration, independent of other benefits, that warrants approval of the project and outweighs and overrides its significant and unavoidable impacts, and thereby justifies approval of the Eastvale 2040 General Plan Project.
2282
Eastvale 2040 General Plan Update
Page | 62 CEQA Findings of Fact and Statement of Overriding Considerations VII. CONCLUSION
The City finds that the EIR is accurate, in full compliance with CEQA and the State CEQA Guidelines, and reflects the independent judgment and analysis of the City. The City declares that no evidence of new significant impacts as defined by CEQA Guidelines Section 15088.5 has been received by the City after circulation of the Draft EIR, which would require recirculation.

Therefore, the City hereby certifies the EIR based on the entirety of the record of proceedings, including the findings and conclusions reached herein.
2283