Packet Pg. 1369 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1370 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1371 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1372 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1373 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1374 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1375 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1376 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1377 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1378 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1379 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1380 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1381 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1382 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1383 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1384 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1385 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1386 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1387 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1388 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1389 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1390 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) OrderID: 322220215
2 Page 1 Of
123456789
10 11
12 13
14 15
16 17
8.a
Packet Pg. 1391 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
123456789
10 11
12 13
14 15
16 17
8.a
Packet Pg. 1392 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
123456789
10 11
12 13
14 15
16 17
8.a
Packet Pg. 1393 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
123456789
10 11
12 13
14 15
16 17
8.a
Packet Pg. 1394 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
123456789
10 11
12 13
14 15
16 17
8.a
Packet Pg. 1395 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
123456789
10 11
12 13
14 15
16 17
8.a
Packet Pg. 1396 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1397 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1398 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 8.a
Packet Pg. 1399 Attachment: Volume II - Technical Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
8.b
Packet Pg. 1400 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) 09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CITY OF EL CENTRO
SOUTHERN PUMP STATION PROJECT
TABLE OF CONTENTS
VOLUME I - CONTRACT DOCUMENTS
Section Description Page
00030 Notice Inviting Bids............................................................................00030-1 00100A Instruction To Bidders......................................................................00100A-1 00300A Bid Forms.......................................................................................00300A-1 00500BA Agreement ...................................................................................00500BA-1 00610A Performance Bond ..........................................................................00610A-1 00620A Payment Bond .................................................................................00620A-1 00660A Workers' Compensation Certificate ...............................................00660A-1 00700H General Conditions ........................................................................00700H-1 00800H Supplementary General Conditions ...............................................00800H-1 00820H Supplementary General Conditions (State) ...................................00820H-1
VOLUME II- TECHNICAL SPECIFICATIONS
8.b
Packet Pg. 1401 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) NOTICE INVITING BIDS SECTION 0030-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SECTION 00030
NOTICE INVITING BIDS
RECEIPT OF BIDS: Sealed Bids will be received at the office of the City Clerk, City of El Centro, the OWNER of the WORK, located at 1275 Main Street, El Centro, CA 92243, June 13, 2024 until at 2:00PM, for the construction of the "Southern Pump Station Project." DESCRIPTION OF WORK: The Southern Pump Station Project WORK includes but is not limited to:
• Installation of Romtec prefabricated wastewater pump station and valve vault including odor control and generator
• Installation of Romtec prefabricated controls building • Installation of associated electrical, controls and gas service • Site excavation, grading, paving, fencing, landscape and irrigation, water service and other improvements
• Construction of equipment pads
• Construction of new 8" to 21" diameter gravity sewer pipeline including tunneling under the Union Pacific Railroad and IID facilities
• Construction of a 14" diameter forcemain
• Decommission of existing Countryside pump station, Countryside South pump station and 4th and Wake pump station
Note: the above work includes all phases as shown in the construction documents. City will award scope as noted in the Bid Schedule. Phase 3 in the plan set is not a part of this bid.
SITE OF WORK: The site of the WORK is located at 102 E. Dannenberg Drive, El Centro, CA on the northeast corner of the intersection of Dannenberg Drive and Farnsworth Road, along Dannenberg Drive, Beverly Lane, Willow Bend Drive, Farnsworth Road, Valor Lane and through an easement in Desert Trails property
COMPLETION OF WORK: The WORK must be completed within three hundred (300) Calendar Days after the commencement date stated in the Notice to Proceed, as issued by the City Clerk.
OPENING OF BIDS: The Bids will be publicly opened and read on June 13, 2024 at 2:00 p.m. at the above-mentioned office of the OWNER.
OBTAINING CONTRACT DOCUMENTS: The Contract Documents are entitled “Southern Pump Station Project".
The Contract Documents may be obtained through PlanetBids by visiting the City of El Centro Website at www.cityofelcentro.org website and navigating to DOING BUSINESS>BIDS & PROPOSALS>PUBLIC WORKS (PLANET BIDS) or visiting directly https://pbsystem.planetbids.com/portal/41180/portal-home
8.b
Packet Pg. 1402 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) NOTICE INVITING BIDS SECTION 0030-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
BID SECURITY: Each Bid shall be accompanied by a certified or cashier's check or Bid Bond in the amount of ten percent (10%) of the Total Bid Price payable to the City of El Centro as a guarantee that the Bidder, if its Bid is accepted, will promptly execute the Agreement. A Bid shall not be considered unless one of the forms of Bidder's security is enclosed with it.
BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of sixty (60) calendar Days after the date of Bid opening.
CONTRACTOR'S LICENSE CLASSIFICATION: In accordance with the provisions of California law, the OWNER has determined that the CONTRACTOR shall possess a valid Class A license at the time that the Bid is submitted. Failure to possess the specified license shall render the Bid as non-responsive and shall act as a bar to award of the Agreement to any Bidder not possessing said license at the time of Bid.
CALIFORNIA WAGE RATE REQUIREMENTS: In accordance with the provisions of California Labor Code §§1770 et seq. as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in such sections for the locality in which the WORK is to be performed. A copy of said wage rates is on file at the office of the OWNER. It shall be mandatory upon the CONTRACTOR to whom the WORK is awarded and upon any Subcontractor under the CONTRACTOR to pay not less than said specified rates to all workers employed by them in the execution of the WORK.
CONTRACTOR REGISTRATION REQUIREMENTS: All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to the State of California, Department of Industrial Relations (DIR) per SB 854.
No contractor of subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
The awarding body must post or require the prime contractor to post job site notices prescribed by regulation. (See 8 Calif. Code Reg. §16451(d) for the notice that previously was required for projects monitored by the CMU.)
All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka California Division of Labor Standards Enforcement).
8.b
Packet Pg. 1403 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) NOTICE INVITING BIDS SECTION 0030-3
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
MANDATORY PRE-BID VISIT TO WORK SITE: Bidders MUST attend a pre-Bid walk through of the proposed WORK site which will be conducted by the City's CONSTRUCTION MANAGER on May 28, 2024 at 9:00 a.m. The meeting will be held at Public Works Conference Room, 307 W. Brighton Avenue, El Centro, CA 92243. The objective of the Pre-bid conference is to acquaint Bidders with the scope of work and conduct a job walk to familiarize the bidders of the site conditions.
PROJECT ADMINISTRATION: All communications relative to this WORK shall be directed, in writing, to the CONSTRUCTION MANAGER prior to opening of Bid through PlanetBids, https://pbsystem.planetbids.com/portal/41180/portal-home CITY'S RESPONSES: All questions regarding the project shall be provided via written response through PlanetBids. The CITY's responses to questions that are asked during the bidding phase will be provided by Addendum. No oral comments shall be of any force or effect with respect to this solicitation. Questions must be submitted more than seven (7) working days prior to bid opening to allow time for response.
LABOR AND MATERIALS AND PERFORMANCE BONDS. Upon Contract award, the successful Bidder shall provide both Payment and Performance Bonds at each at 100% of the Contract Price as specified in the Contract Documents.
LICENSES. Each Bidder shall possess a valid Class A Contractor’s license issued by California Contractors State License Board at the time of Bid submission and a current City business license at the time of Contract award.
RETENTION. The City shall withhold five percent (5%) of any progress payment as retention. contractor may substitute securities in place of retained funds withheld by the City.
BID BOND All bids must include bidder's security in an amount of at least 10 percent of the amount bid, and in a form specified by the Code. Pub Cont C §§20170-20171.
OWNER'S RIGHTS RESERVED: The OWNER reserves the right to reject any or all Bids, to waive any informality in a Bid, and to make awards to the lowest responsive Bidder as it may best serve the interest of the OWNER.
Date:_______________________ OWNER: City of El Centro
______________________________
Norma Wyles, City Clerk
- END OF NOTICE INVITING BIDS8.b
Packet Pg. 1404 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
THIS PAGE INTENTIONALLY LEFT BLANK
8.b
Packet Pg. 1405 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SECTION 00100A
INSTRUCTIONS TO BIDDERS
1. DEFINED TERMS. Terms used in these Instructions to Bidders and the Notice Inviting Bids which are defined in the General Conditions have the meanings assigned to them in the General Conditions. The term "Bidder'' means one who submits a Bid directly to OWNER, as distinct from a sub-bidder, who submits a Bid to a Bidder.
2. INTERPRETATIONS AND ADDENDA.
2.1 All questions about the meaning or intent of the Contract Documents are to be directed to the OWNER. Interpretations or clarifications considered necessary by the OWNER in response to such questions will be issued by Addenda. Questions received less than seven (7) working days prior to the date for opening of Bids will not be answered.
Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
2.2 Addenda may also be issued to modify the Contract Documents as deemed advisable by the OWNER or CONSTRUCTION MANAGER.
3. COMPETENCY OF BIDDERS. In selecting the lowest responsive Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the WORK covered by the Bid and completeness of the submitted Bid. No Bid for the WORK will be accepted from a contractor who does not hold a valid California contractor’s license applicable to the type of WORK bid upon at the time of opening Bids and who is not registered with the Department of Industrial Relations.
4. CITY BUSINESS LICENSE. The Bidder awarded the Agreement and all Subcontractors of that Bidder, who do not already have a business license to operate in El Centro will be required to secure the appropriate license from the CITY before a contract can be executed with the CITY.
5. DISQUALIFICATION OF BIDDERS. More than one (1) Bid from an individual, firm, partnership, corporation, or association under the same or different names will not be considered. If the OWNER believes any Bidder is interested in more than one (1) Bid for the WORK contemplated, then all Bids in which such Bidder is interested will be rejected.
If the OWNER believes that collusion exists among the Bidders, all Bids will be rejected.
A party who has quoted prices to a Bidder is not hereby disqualified from quoting prices to other Bidders, or from submitting a Bid directly for the WORK.
6. BIDDER'S EXAMINATION OF CONTRACT DOCUMENTS AND SITE
6.1 It is the responsibility of each Bidder before submitting a Bid:
8.b
Packet Pg. 1406 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
(a) To examine thoroughly the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to below); (b) To visit the site to become familiar with and satisfy Bidder as to the general and local conditions that may affect cost, progress, or performance, of the WORK; (c) To consider Federal, State and local Laws and Regulations that may affect cost, progress, or performance of the WORK;
(d) To study and carefully correlate the Bidder's knowledge and observations with the Contract Documents, and other related data; and
(e) To notify the CONSTRUCTION MANAGER of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related data.
6.2 Reference is made to the Supplementary General Conditions for identification of:
(a) Those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by the DESIGN CONSULTANT in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such reports; however, the interpretation of such technical data, including any interpolation or extrapolation thereof, together with non-technical data, interpretations, and opinions contained therein or the completeness thereof is the responsibility of the Bidder; and
(b) Those drawings of physical conditions in or relating to existing surface and subsurface conditions (except Underground Utilities) which are at or contiguous to the site that have been utilized by the DESIGN CONSULTANT in the preparation of the Contract Documents. The Bidder may rely upon the accuracy of the technical data contained in such drawings; however, the interpretation of such technical data, including any interpolation or extrapolation thereof together with nontechnical data, interpretations, and opinions contained in such drawings or the completeness thereof is the responsibility of the Bidder. It is the responsibility of Bidder to consider any ground water conditions that may affect their Bid.
6.3 Copies of such reports and drawings will be made available by the OWNER to any Bidder on request if said reports and drawings are not bound herein. Those reports and drawings are not part of the Contract Documents, but the technical data contained therein upon which the Bidder is entitled to rely, in Paragraph SGC-3 of the Supplementary General Conditions has been identified and established.
6.4 Information and data reflected in the Contract Documents with respect to Underground Utilities at or contiguous to the site is based upon information and data
8.b
Packet Pg. 1407 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-3
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
furnished to the OWNER and the DESIGN CONSULTANT by the owners of such Underground Utilities or others, and the OWNER does not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary General Conditions or the section entitled "Protection and Restoration of Existing Facilities" of the General Requirements.
6.5 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders on subsurface conditions, Underground Utilities and other physical conditions, and possible changes in the Contract Documents due to differing conditions appear in Paragraphs 4.2, 4.3, and 4.4 of the General Conditions.
6.6 Before submitting a Bid, each Bidder will, at Bidder's own expense, make or obtain any additional examinations, investigations, explorations, tests, and studies and obtain any additional information and data which pertain to the physical conditions (surface, subsurface, and Underground Utilities) at or contiguous to the site or otherwise which may affect cost, progress, or performance of the WORK or which relate to any aspect of the means, methods, techniques, sequences, or procedures of construction to be employed by Bidder and Safety precautions and programs incident thereto which the Bidder deems necessary to determine its Bid for performing the WORK in accordance with the time, price, and other terms and conditions of the Contract Documents.
7. BID FORM.
7.1 The Bid shall be made on the Bid schedule(s) bound herein and the pages may be removed from the bound volume. In the event there is more than one (1) Bid schedule, the Bidder may bid on any individual schedule or on any combination of schedules. The envelope enclosing the sealed Bid shall be plainly marked in the upper left-hand corner with the name and address of the Bidder and shall bear the words "BID FOR," followed by the title of the Contract Documents for the WORK, the name of the OWNER, the address where Bids are to be delivered or mailed to, and the date and hour of opening of Bids. The Bid Security shall be enclosed in the same envelope with the Bid.
7.2 All blanks on the Bid Form must be completed in ink.
7.3 Bids by corporations must be executed in the corporate name by the president, a vicepresident (or other corporate officer). Such Bid shall be accompanied by the enclosed Certificate of authority to sign, attested by the secretary or assistant secretary, and with the corporate seal affixed. The corporate address and state of incorporation must appear below the signature.
7.4 Bids by partnerships must be executed in the partnership name and be signed by a managing partner, accompanied by evidence of authority to sign and his/her title must appear under the signature and the official address of the partnership must appear below the signature.
7.5 All names must be printed below the signature.
8.b
Packet Pg. 1408 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-4
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
7.6 The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. Failure to acknowledge Addenda shall render the Bid non-responsive and shall be cause for its rejection.
7.7 The address to which communications regarding the Bid are to be directed must be shown.
7.8 All Bidders must provide evidence of authority to conduct business in California to the extent required by law.
8. QUANTITIES OF WORK. The quantities of work or material stated in unit price items of the Bid are supplied only to give an indication of the general scope of the WORK; the OWNER does not expressly or by implication agree the actual amount of work or material will correspond therewith, and reserves the right after award to increase or decrease the amount of any unit price item of the WORK in accordance with ARTICLE 10 of the General Conditions, to delete any Bid item in its entirety, or to add additional Bid items up to and including an aggregate total amount not to exceed twenty-five percent (25%) of the Contract Price.
9. SUBSTITUTE OR "OR EQUAL" ITEMS. Whenever materials or equipment are specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier and the name is followed by the words "or equal,'' the Bidder may write the name of a substitute Supplier (which the Bidder considers as an "'or equal") in the Proposed Substitute Equipment/Material Supplier List in the Bid Form.
These substitute Suppliers will only be considered after award of the Agreement. The procedure for the submittal of substitute or “or equal” products is specified in Section 01350.
10. SUBMISSION OF BIDS. The Bid shall be delivered by the time and to the place set forth in the Notice Inviting Bids. It is the Bidder's sole responsibility to see that its Bid is received in proper time.
11. BID SECURITY, BONDS, AND INSURANCE. Each Bid shall be accompanied by a certified or cashier's check or approved Bid Bond in the amount stated in the Notice Inviting Bids. Said check or bond shall be made payable to the OWNER and shall be given as a guarantee that the Bidder, if awarded the Agreement will enter into an Agreement with the OWNER, and will furnish the necessary insurance certificates, Payment Bond, and Performance Bond; each of said Bonds to be in the amount stated in the Supplementary General Conditions. In case of refusal or failure to enter into said Agreement, the check or Bid Bond, as the case may be, shall be forfeited to the OWNER. If the Bidder elects to furnish a Bid Bond as its Bid security, the Bidder shall use the Bid Bond form bound herein, or one conforming substantially to it in form.
12. DISCREPANCIES IN BIDS. In the event there is more than one (1) Bid item in a Bid schedule, the Bidder shall furnish a price for all Bid items in the schedule, and failure to
8.b
Packet Pg. 1409 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-5
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
do so will render the Bid non-responsive and may cause its rejection. In the event of a discrepancy between words and numbers in a Bid item, the words shall govern. In the event there are unit price Bid items in a Bid schedule and the amount indicated for a unit price Bid item does not equal the product of the unit price and quantity, the unit price shall govern and the amount will be corrected accordingly, and the Bidder shall be bound by said correction. In the event there is more than one (1) Bid item in a Bid schedule and the total indicated for the schedule does not agree with the sum of the prices Bid on the individual items, the prices Bid on the individual items shall govern and the total for the schedule will be corrected accordingly, and the Bidder shall be bound by said correction.
13. MODIFICATIONS AND UNAUTHORIZED ALTERNATIVE BIDS. Unauthorized conditions, limitations, or provisos attached to the Bid will render it informal and may cause its rejection as being non-responsive. The completed Bid forms shall be without interlineations, alterations, or erasures in the printed text. Alternative Bids will not be considered unless called for. Oral, telegraphic, or telephonic Bids or modifications will not be considered.
14. WITHDRAWAL OF BID. The Bid may be withdrawn by the Bidder by means of a written request, signed by the Bidder or its properly authorized representative. Such written request must be delivered to the place set forth in the Notice Inviting Bids for receipt of Bids prior to the scheduled closing time for receipt of Bids.
15. BID RESULTS. To obtain Bid results, provide a self-addressed, stamped envelope, referencing “Southern Pump Station Project.'' Bid tabulation will be mailed to you after verification of extensions. Bid results will not be given out over the telephone. Bid results may be posted on the CITY's website.
16. AWARD OF CONTRACT. Award of a contract, if it be awarded, will be on the basis of the Bid proposal estimated quantities and will be made to the lowest responsive Bidder whose Bid complies with all the requirements prescribed. Unless otherwise specified, any such award will be made within the period stated in the Notice Inviting Bids that the Bids are to remain open. Unless otherwise indicated, a single award will be made for all the Bid items in an individual Bid schedule. The lowest bid shall be the lowest total of the bid prices on the base contract and those additive or deductive items that were specifically identified in the bid solicitation as being used for the purpose of determining the lowest bid price.
17. RETURN OF BID SECURITY. Within fourteen (14) Days after the selected or replacement low Bidder signs the Agreement, the OWNER will return the Bid securities accompanying each of the Bids. They will be returned to the respective Bidders whose Bids they accompany.
18. EXECUTION OF AGREEMENT. The Apparent Low Bidder will be required to execute a written Agreement with the OWNER on the form of agreement provided, shall secure all insurance, and shall furnish all certificates and Bonds required by the Contract Documents
8.b
Packet Pg. 1410 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-6
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
within fourteen (14) Days after receipt of notification that the Bidder is the Apparent Low Bidder. Failure or refusal to enter into an Agreement as herein provided or to conform to any of the requirements set forth in connection therewith shall be considered nonresponsive and result in the forfeiture of the Bid security. If the lowest responsive Bidder refuses or fails to execute the Agreement, then the OWNER may proceed to the second (2nd) lowest responsive Bidder. If the second (2nd) lowest responsive Bidder refuses or fails to execute the Agreement, then the OWNER may proceed to the third (3rd) lowest responsive Bidder and so on. On the failure or refusal of such second (2nd), third (3rd) or other lowest Bidder to execute the Agreement, each such Bidder's Bid securities shall be likewise forfeited to the OWNER.
19. LIQUIDATED DAMAGES. Provisions for liquidated damages, if any, are set forth in the Agreement.
20. WORKERS' COMPENSATION REQUIREMENT. The Bidder should be aware that in accordance with California Labor Code §3700 it will, if awarded the Agreement, be required to secure the payment of compensation to its employees and execute the Workers' Compensation Certification in the form contained in these Contract Documents.
21. FILING OF BID PROTESTS
By submitting a Bid, each Bidder hereby agrees and understands that the Bidder must comply with these protest procedures and exhaust all administrative remedies set forth herein prior to the initiation of any type of related legal action. Subject to the requirements of applicable law, this protest procedure can also be used to resolve issues surrounding the City’s determination of a Bidder as not responsible. The following terms as used in this Section shall have the following meanings:
“Protest” shall mean a written objection by an interested party or affected party to (i) the requirements or specifications contained in the Notice to Bidders or any portion of documents accompanying that notice; or (ii) a proposed award recommendation.
A. Solicitation Phase Protest.
The purpose of the solicitation is to obtain competitive Bids from Bidders. Any Bidder who has submitted a bid and who believes that a particular specification or requirement is impractical, unduly restrictive, or ambiguous may advise the AGENCY of its concerns by submitting a detailed solicitation protest statement in accordance with the requirements set forth below in this Section A. The Protest does not replace the requirement to report irregularities in the bid documents.
(1) Contents and Requirements
A solicitation protest must be submitted to the contact named in the bid documents by personal delivery or email by close of business at least fifteen (15) calendar days prior to the Bid due date, and must contain all of the following to be considered:
a. The name, address, and telephone number of the protester; and b. The Project Name and Project Number; and
8.b
Packet Pg. 1411 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-7
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
c. A detailed statement setting forth the grounds for protest, which shall include all the factual and legal documentation in support of the protest in sufficient detail to establish merits of the protest; and
d. The desired resolution of the protest.
If the submitted protest does not comply with the requirements set forth herein, then it will not be considered for evaluation and will be returned to the protestor. Any grounds for protest not raised are waived. The protest may not be amended after filing. The protest is a public document.
(2) Evaluation and Determination
No hearing will be held on the protest. City’s Public Works Director, or designee (“Public Works Director”), will review the protest and any supporting material and conduct an investigation of the facts. That City representative may, but need not, require other Bidders to submit statements or arguments regarding the protest and may discuss the protest with the protestor. The Public Works Director shall issue a final written decision regarding any solicitation protest to each Bidder prior to opening of bids. The written decision will cite any actions that will or will not be taken in response to the protest. That decision shall be final, and there shall be no further administrative recourse, including no protest of an award.
B. Protest of Award
(1) Contents and Requirements
Following the opening of the Bids, but before formal award of the bid, any Bidder may protest City’s proposed award of the Contract by submitting a written protest to Office of the City Clerk, 1275 W. Main Street, El Centro CA, 92243, attention Public Works Director, no later than close of business on the fifth (5th) City business day after the opening of the bids. That protest must be submitted in a timely manner, signed by the protesting Bidder, and must contain all of the following to be considered:
a. The name, address, and telephone number of the protestor; and b. The Project Name and Project Number; and
c. The City action or recommendation that is being protested; d. A detailed statement setting forth every ground, reason, legal authority and facts in support of the protest, including all documents and evidence including specific references to parts of the bid documents; and
e. A clear statement of the relief requested.
The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other bidders.
8.b
Packet Pg. 1412 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-8
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
A protest that does not comply with the requirements set forth herein will be returned to the protestor. The protest shall not be amended after filing. Any grounds for protest not raised are waived. The protest is a public document. (2) Evaluation and Determination
The protested bidder may file responsive statements to the protest within three (3) City business days after the receipt of the protest and shall copy all other bidders.
Any other responding Bidder shall transmit its response to the protesting Bidder concurrent with delivery to the City and all other bidders. The Public Works Director shall review the facts and all submittals relative to the protest and shall issue a written decision setting forth the basis for such decision. The written decision will be issued to the protestor and to all affected parties. Unless otherwise required by law, no hearing shall be provided. In the event a hearing is conducted, the Public Works Director shall issue written notice to the protestor and affected parties identifying the date and time for the hearing, along with rules concerning the hearing.
C. Delay in Award
Award of any proposed contract maybe delayed pending the resolution of the protest unless one or more of the following conditions is present:
1. The items or services being procured are urgently required;
2. Delivery or performance will be unduly delayed by failure to make award promptly; or
3. Failure to make prompt award will otherwise cause undue harm to the City.
D. No Limitations on Remedies
Nothing contained herein shall be construed to act as a limitation of the City’s choice of remedies or confer any right upon any interested party or affected party to a remedy.
E. Basis for Choice Remedy
In determining the appropriate remedy, the City shall consider all of the circumstances surrounding the notice of bids and/or award, including, but not limited to:
1. The seriousness of any deficiency found to exist in the contracting process;
2. The effect of the action on the competitive process;
3. Any urgency surrounding the requirement to enter into a contract; and
4. The effect that implementing the remedy will have on the City.
F. Remedies
8.b
Packet Pg. 1413 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) INSTRUCTIONS TO BIDDERS 00100A-9
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
If the City determines that the proposed award was not made in accordance with applicable statues, regulations, policies and/or procedures, the City, in its sole discretion, may grant any of the following remedies or any other remedy it deems appropriate:
1. Prior to award, City may do the following
(a) reject all bids and determine not to proceed with the project at that time; (b) reject all bids and issue a new solicitation;
(c) make a new selection/award recommendation to the next lowest qualified bidder; or
(d) award the contract consistent with applicable statutes, regulations, policies and procedures;
2. In its sole discretion, take no further action; or
3. Take any other action that is permitted by law to promote compliance.
- END OF INSTRUCTIONS TO BIDDERS -
8.b
Packet Pg. 1414 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
00300A
BID FORMS
BID TO: CITY OF EL CENTRO
l. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the Contract Documents (as defined in Article 6 of the Agreement) to perform the WORK as specified or indicated in the Contract Documents entitled “Southern Pump Station Project.”
2. Bidder accepts all of the terms and conditions of the Contract Documents, including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid security.
3. This Bid will remain open for the period stated in the "Notice Inviting Bids" unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the "Notice Inviting Bids" and the "Instructions to Bidders,'' and will furnish the insurance certificates, Payment Bond, and Performance Bond required by the Contract Documents.
4. Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of all of which is hereby acknowledged):
Number ____________________ Date ____________________
____________________ ____________________
____________________ ____________________
5. Bidder has familiarized itself with the nature and extent of the Contract Documents, WORK, site, locality where the WORK is to be performed, the legal requirements (Federal, State and local laws, ordinances, rules and regulations), and the conditions affecting cost, progress or performance of the WORK and has made such independent investigations as Bidder deems necessary.
To all the foregoing, and including all Bid schedule(s) and information required from Bidder contained in this Bid Form, said Bidder further agrees to complete the WORK required under the Contract Documents within the Contract Time set forth in the Contract Documents, and to accept in full payment therefore the Contract Price based on the total Bid price(s) named in the aforementioned Bid schedule(s).
Dated:_____________________ Bidder: _______________________ By: __________________________
(Signature)
Title:
8.b
Packet Pg. 1415 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
BID SCHEDULE - PRICES
Pursuant to and in compliance with the Invitation for Bids and other Contract Documents relating to the proposal for the construction of,
Southern Pump Station Project
All in accordance with the Drawings and Project Specifications the undersigned Bidder, having familiarized himself with the terms of the Agreement, the local conditions affecting the performance of the Agreement and the cost of the WORK at the place the WORK is to be done; and with the Drawings, Project Specifications and other Contract Documents, hereby stipulated; CONTRACTOR agrees to complete the Agreement, including all of its component parts and everything required to be performed, and to provide and furnish any and all labor, materials, equipment, tools, expendable supplies, and all utility and transportation services necessary to perform the Agreement, and complete in a workmanlike manner all of the WORK required in connection with the Agreement, all in strict conformance with the Drawings and Specifications for the following prices and sum.
The following Bid Schedule of estimated quantities is included for convenience of bidding and a basis for comparison of Bids only, and CITY does not, expressly, or by implication, agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the WORK, or to delete portions of the WORK, as may be deemed necessary or advisable by CITY.
All Bidders are REQUIRED to use unit prices where indicated and to complete this schedule.
All items shall be complete and in place per Plans and these Bid and Contract Documents.
Note: Payment for all work (labor, material, equipment, etc.) required for the construction and installation of the improvement as shown on the plans which is not specifically identified below in the Bid Schedule shall be considered as included in the CONTRACTOR’s price, as itemized below, for the various items of work for which the work is required, and no additional compensation shall be made therefor.
8.b
Packet Pg. 1416 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-3
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
PROPOSAL BID FORM
The undersigned hereby declares that it has carefully examined the location of the proposed work, that it has examined the plans and specifications and read the accompanying instructions to bidders and hereby proposes to furnish all material except owner furnished materials, and do all work required to complete the said work in accordance with said plans and specifications and special provisions for the unit prices set forth in the following schedule. The bidder shall furnish prices for all items shown in the proposal.
BASE BID-Bid Schedule PHASE 1A
Schedule of prices for construction of SOUTHERN PUMP STATION PROJECT in accordance with the Contract Documents and Section 01025 “Measurement and Payment-Phase 1”.
Item Description Unit Qty Unit Price Amount
1 Mobilization/Demobilization LS 1 $ $
2 Dewatering System (Plan Included) LS 1 $ $
3 Temporary Bypass Pumping of
wastewater (with 100% backup
standby capability)
LS 1 $ $
4 Traffic Control LS 1 $ $
5 Furnish and install Romtec complete
prefabricated sewer pump station
system. This system must include all
the support services and a third-party
warranty. System includes pumps,
valves, wet well, valve vault, electrical
controls and building, odor control,
generator, site improvements and
appurtenances, complete per plans and
specifications.
LS 1 $ $
6 Furnish and Install 14” PVC-C905
Sewer Force main, including fittings
and appurtenances, complete per plans
and specifications.
LF 2,370
7 Furnish and Install 8” PVC SDR 35
Gravity Sewer
LF 390 $ $
8 Furnish and Install 12” PVC SDR 35
Gravity Sewer
LF 2,375 $ $
9 Furnish and Install 18” PVC SDR 26
Gravity Sewer
LF 778 $ $
10 Furnish and Install 21” PVC SDR 26
Gravity Sewer
LF 251 $ $
11 Furnish and Install Manholes EA 12 $ $
12 Not In Use - - - -
13 Tunneling under UPRR LF 260 $ $
14 Tunneling under IID Facilities LF 190 $ $
8.b
Packet Pg. 1417 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-4
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
15 Not In Use - - - -
16 Not In Use - - - -
17 Permits- (per Contract Documents
section 01060 “Regulatory
Requirements”).
LS 1 $ $
18 Potholing LS 1 $ $
19 Erosion Control LS 1 $ $
20 Survey Monument Preservation LS 1 $ $
21 Construction Staking LS 1 $ $
22 Material Testing LS 1 $ $
23 Special Inspections LS 1 $ $
TOTAL BASE BID, BID PHASE 1A IN FIGURES
$____________________________________________
TOTAL BASE BID, BID PHASE 1A IN WORDS
$__________________________________________
8.b
Packet Pg. 1418 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-5
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
ADDITIVE BID-Bid Phase 1B
Schedule of prices for construction of SOUTHERN PUMP STATION PROJECT in accordance with the Contract Documents and Section 01025 “Measurement and Payment-Phase 1”.
Item Description Unit Qty Unit Price Amount
1 Mobilization/Demobilization LS 1 $ $
2 Dewatering System (Plan Included) LS 1 $ $
3 Temporary Bypass Pumping of
wastewater (with 100% backup
standby capability)
LS 1 $ $
4 Traffic Control LS 1 $ $
5 Not In Use - - - -
6 Not In Use - - - -
7 Furnish and Install 8” PVC SDR 35
Gravity Sewer
LF 765 $ $
8 Furnish and Install 12” PVC SDR 35
Gravity Sewer
LF 28 $ $
9 Furnish and Install 18” PVC SDR 26
Gravity Sewer
LF 3,475 $ $
10 Not In Use - - - -
11 Furnish and Install Manholes EA 12 $
12 Furnish and Install Manholes (Drop) EA 1 $ $
13 Not In Use - - - -
14 Tunneling under IID Facilities LF 88 $ $
15 Dogwood Lateral 2 Delivery #28
(Complete per plans and
specifications)
LS 1 $ $
16 Decommission existing Countryside
Pump Station, to be abandoned in
place, and connect inlet sewer to new
gravity sewer, including temporary
sewer bypass, complete per plans and
specifications.
LS 1 $ $
17 Permits- (per Contract Documents
section 01060 “Regulatory
Requirements”).
LS 1 $ $
18 Potholing LS 1 $ $
19 Erosion Control LS 1 $ $
20 Survey Monument Preservation LS 1 $ $
21 Construction Staking LS 1 $ $
22 Material Testing LS 1 $ $
8.b
Packet Pg. 1419 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-6
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
TOTAL ADDITIVE BID, BID PHASE 1B IN FIGURES
$____________________________________________
TOTAL ADDITIVE BID, BID PHASE 1B IN WORDS
$__________________________________________
BID PROPOSAL SUMMARY
(for apparent low bidder determination)
TOTAL BID (Base Bid + Additive Bid) (in figures): $ _________________________ TOTAL BID (Base Bid + Additive Bid) (in words): $ _________________________ ______________________________________________________________________________
8.b
Packet Pg. 1420 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-7
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
LIST OF SUBCONTRACTORS
The Bidder shall list below the name and the location of the place of business of each Subcontractor who will perform work or labor or render service to CONTRACTOR in or about the construction of the WORK, or a Subcontractor licensed by the State who, under subcontract to CONTRACTOR, specially fabricates and installs a portion of the WORK according to detailed Drawings contained in the plans and specifications, in an amount in excess of one-half (0.5) of one (1.0) percent of CONTRACTOR’s total Bid. The Bidder shall also list below the portion of the WORK which will be done by each Subcontractor under this contract. CONTRACTOR shall list only one (1) Subcontractor for each portion of the WORK. If Bidder does NOT intend to use ANY subcontractors, state “NONE” in the first block.
Substitutions of subcontractors listed will not be permitted unless approved by the City of El Centro.
The Bidder’s attention is directed to Paragraph 6.5.3 entitled “Subcontract Limitations” of the General Conditions, which sets forth the percent of the WORK to be performed with the Bidders’ own forces. Failure to comply with this requirement will render the Bid non-responsive and may cause its rejection.
PORTION OF WORK NAME OF
SUBCONTRACTOR
DIR REGISTRATION
NUMBER
PLACE OF BUSINESS
ADDRESS/TELEPHONE No.
USE ADDITIONAL FORMS AS NECESSARY
8.b
Packet Pg. 1421 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-8
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
GENERAL INFORMATION
BIDDER’S GENERAL INFORMATION:
The Bidder shall furnish the information requested below. Additional sheets shall be attached as required. Failure to complete Item Nos. 1 through 3 will cause the Bid to be non-responsive and shall cause its rejection. In any event, no award will be made until all of the Bidder’s general information (i.e., items 1 through 3, inclusive) is delivered to OWNER.
INFORMATION TO BE PROVIDED BY ALL BIDDERS WITH BID SUBMITTAL:
(1) CONTRACTOR’s name and address: ________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________
(2) CONTRACTOR’s telephone number: _________________________________________ FAX number: _____________________________________
(3) CONTRACTOR’s license: Primary classification ______________________________
California State License No. and Expiration Date ______________________________
Supplemental classifications held, if any: __________________________________________ Name of Licensee, if different from (1) above: _______________________________________ _____________________________________________________________________________ To be considered for award, CONTRACTOR shall have met all requirements established by OWNER of the Project.
- END GENERAL INFORMATION –
8.b
Packet Pg. 1422 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-9
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
NONCOLLUSION DECLARATION
TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID
The undersigned declares:
I am the __________________ of ______________________, the party making the foregoing bid.
The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding.
The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid, and will not pay, any person or entity for such purpose.
Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on ____________ [date], at ______________________ [city], ________________________ [state].
END NONCOLLUSION DECLARATION –
8.b
Packet Pg. 1423 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-10
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
BID BOND
KNOW ALL MEN BY THESE PRESENTS,
That _____________________________ as Principal, and ____________________as Surety, are held and firmly bound unto the City of El Centro, hereinafter called “OWNER,” in the sum of __________________________ dollars, (_______________) (not less than ten (10) percent of the total amount of the Bid) for the payment of which sum, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents.
WHEREAS, said Principal has submitted a Bid to said OWNER to perform the WORK required under the Bid schedule(s) of OWNER’s Contract Documents entitled:
_____________________________________________________________________________
NOW THEREFORE, if said Principal is awarded a contract by said OWNER and, within the time and in the manner required in the Notice Inviting Bids and the Instructions to Bidders enters into a written Agreement on the form of agreement bound with said Contract Documents, furnishes the required certificates of insurance and furnishes the required Performance Bond and Payment Bond, then this obligation shall be null and void, otherwise it shall remain in full force and effect. In the event suit is brought upon this Bond by said OWNER and OWNER prevails, said Surety shall pay all costs incurred by said OWNER in such suit, including reasonable attorneys’ fee to be fixed by the court and actual costs.
SIGNED AND SEALED, this______________ day of______________________ , 20______ _______________________________ (SEAL)_________________(SEAL) (Principal) (Surety)
By: _____________________________ By:__________________________________ (Signature) (Signature)
(SEAL AND NOTARIAL ACKNOWLEDGEMENT OF SURETY)
-END BID BOND –
8.b
Packet Pg. 1424 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-11
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CORPORATE CERTIFICATION
OR
PARTNERSHIP INFORMATION
Name of Corporation or Partnership_____________________________________________ State of Incorporation___________________________________________________________ List names and addresses of each partner, or titles, names and business addresses of President, Secretary and Treasurer.
______________________________________________________________________________ ______________________________________________________________________________ ______________________________________________________________________________ Date_____________________________ Contractor__________________________ Signature_________________________ Title________________________________ ATTEST:
__________________________________
Signature by
__________________________________
Title
END OF CORPORATE CERTIFICATION OR PARTNERSHIP INFORMATION
8.b
Packet Pg. 1425 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-12
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
DRUG/ALCOHOL TESTING REQUIREMENTS
CONTRACTOR shall execute the following form as required by the Federal Drug and Alcohol, Section 49 CFR Part 382.
I agree to comply with the provisions of Federal Omnibus Transportation Employee Testing Act of 1991, and that I will administer a program of alcohol and drug testing of all commercial vehicle operators, as required by Federal Regulations.
CONTRACTOR certifies compliance with the City of El Centro’s Drug and Alcohol Free Workplace Policy as a condition of the State Drug-Free Workplace Act of 1990 (Government Code sections 8350 et seq.) and the Federal Drug Free Workplace Act of 1988 (41 U.S.C.A. Sections 701 et seq.) In addition, CONTRACTOR agrees to submit a copy of its own drug free workplace policy.
Dated_____________________________
________________________________________
CONTRACTOR’s Name
_________________________________________
CONTRACTOR’s Signature
_________________________________________
Title
END DRUG/ALCOHOL TESTING REQUIREMENT
8.b
Packet Pg. 1426 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-13
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SITE VISIT CERTIFICATE
THIS IS TO CERTIFY that:
I, ___________________________________________________(name of bidder or his representative) of the _____________________________________________________ (name of construction firm) visited the site in connection with the Bid for the ______________________________________________________________ (name of the Project.)
Having examined the bid documents, I certify that I have acquainted with the nature, geographical and exact location of the works; the general conditions of execution; the neighboring buildings and other constraints that might affect the construction methods; the obligation not to obstruct the traffic where requested, or the flow of any water; the physical conditions specific to the construction sites; the climatic conditions; local conditions; means of communication and transport; the possibility of supplying water, electricity and fuel; the availability of labor sufficient in number and quantity; all constraints and obligations resulting from social, tax and customs legislation; and all conditions and circumstances which might influence the execution or price of the works.
I further certify that I am satisfied with the description of the works and the Project Engineer’s explanations and that I understand perfectly the works to be undertaken as specified and implied in the execution of the Contract.
______________________________________________
(Name and Signature of Bidder or his Representative)
Date : ______________________
Note 1: This form shall be completed at the time of the visit to the site where the works are to be carried out.
- END OF SITE VISIT CERTIFICATE –
8.b
Packet Pg. 1427 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) BID FORMS 00300A-14
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR’S CERTIFICATION OF QUALIFICATION
FOR LICENSE CLASSIFICATION
After award of the contract, the Contractor, whether an individual, co-partnership, limited partnership, corporation, or any other combination or organization, shall execute the following form:
1. If an individual, I hereby certify that I am, or my responsible managing employee ________________________ (insert name) is, qualified for the license classification called for in these contract documents.
2. If a co-partnership or limited partnership, the general partner hereby certifies that the general partner _______________________________ (insert name), or responsible managing employee __________________________________ (insert name), is qualified for the license classification called for in these contract documents.
3. If a corporation, or any other combination or organization, the responsible managing officer _______________________________ (insert name), or a responsible managing employee ________________________________ (insert name), is qualified for the license classification called for in these contract documents.
If the individual who qualifies the Contractor for the license classification called for in these contract documents changes during the progress of the work, then Contractor shall, within seven (7) days of any such change, notify the Director of Public Works in writing of such change, including the name, license number and status of the individual.
For the purpose of this Certification, a responsible managing employee shall mean an individual who is a bona fide employee of the Contractor and is actively engaged in the classification of work for which that individual is the qualifying person on behalf of the Contractor under California law.
DATED:____________________ CONTRACTOR:___________________________________ SIGNATURE:_____________________________ TITLE:______________________________ ATTEST:
SIGNATURE BY:___________________________________________ TITLE:__________________________________________________ - END OF CONTRACTOR’S CERTIFICATION OF QUALIFICATION –
- END OF BIDDING DOCUMENTS –
8.b
Packet Pg. 1428 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CITY OF EL CENTRO
SOUTHERN PUMP STATION PROJECT
CONSTRUCTION SERVICES AGREEMENT
This CONSTRUCTION SERVICES AGREEMENT (“Agreement”), is made and effective , by and between the City of El Centro, a municipal corporation ("CITY"), and , a ("CONTRACTOR"). In consideration of the mutual covenants and conditions set forth herein, the parties agree as follows:
I. SCOPE OF WORK
The CONTRACTOR shall perform within the time set forth in Article 2 of this Agreement and shall furnish all labor, materials, equipment, tools, utility services, and transportation and perform and complete all work required in connection with the following:
• Installation of Romtec prefabricated wastewater pump station and valve vault including odor control and generator
• Installation of Romtec prefabricated controls building • Installation of associated electrical, controls and gas service • Site excavation, grading, paving, fencing, landscape and irrigation, water service and other improvements
• Construction of equipment pads
• Construction of new 8" to 21" diameter gravity sewer pipeline including tunneling under the Union Pacific Railroad and IID facilities
• Construction of a 14" diameter forcemain
• Decommission of existing Countryside pump station, Countryside South pump station and 4th and Wake pump station
By entering into this Agreement, CONTRACTOR acknowledges that there may be other contractors on the site whose work will be coordinated with that of its own.
CONTRACTOR expressly warrants and agrees that it will cooperate with other contractors and will do nothing to delay, hinder, or interfere with the work of other separate contractors, the CITY, the OWNER, the Architect, or utilities. CONTRACTOR also expressly agrees that, in the event its work is hindered, delayed, interfered with, or otherwise affected by a separate contractor, its sole remedy will be a direct action against the separate contractor.
To the extent allowed by law, the CONTRACTOR will have no remedy, and hereby expressly waives any remedy against the CITY, the OWNER, or the Architect on account of delay, hindrance, interference or other events caused by a separate contractor.
II. TIME FOR PROJECT COMPLETION
All of CONTRACTOR’s work on the Project shall be completed within durations established for the individual activities as set forth in the Project Construction Schedule.
All work shall commence ten (10) calendar days after receiving a written Notice to Proceed from the CITY or OWNER, if an OWNER is employed by CITY on the Project.
8.b
Packet Pg. 1429 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR shall refer to the invitations for bids, and Project Plans and Specifications, all of which, as set forth below, are incorporated herein by reference, for contractual obligations regarding individual activity durations. The aggregate sum total work of all individual Prime Contractors to the CITY comprises the entire “Project” and shall be commenced and completed in conformance with the Project Construction Schedule. The entire Project shall be completed within 365 “Calendar” days as defined by Article 1 – Definitions of the General Conditions.
III. THE CONTRACT SUM
The CITY shall pay to the CONTRACTOR for the performance of this Agreement, subject to any additions and deductions provided in the Project documents, the sum of dollars ($ ).
IV. PROGRESS PAYMENTS
Based upon Applications for Payment submitted to the Architect by the CONTRACTOR and Certificates for Payment issued by the Architect, the CITY shall make progress payments on account of the Contract Sum to the CONTRACTOR as provided in the General Conditions.
This Agreement is subject to the provisions of Article 1.7 (commencing at Section 20104.50) of Division 2, Part 3 of the Public Contract Code regarding prompt payment of contractors by local governments. Article 1.7 mandates certain procedures for the payment of undisputed and properly submitted payment requests within 30 days after receipt, for the review of payment requests, for notice to Contractor of improper payment requests, and provides for the payment of interest on progress payment requests that are not timely made in accordance with that Article. This AGREEMENT hereby incorporates the provisions of Article 1.7 as though fully set forth herein.
V. RETENTION OF SECURITIES
Public Contract Code Section 22300 permits the substitution of securities for any monies withheld by a public agency to ensure performance under a contract, at the request and expense of the CONTRACTOR.
VI. INDEMNITY, DEFENSE AND HOLD HARMLESS AGREEMENT
CONTRACTOR shall indemnify, defend with legal counsel approved by CITY, and hold harmless CITY, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with CONTRACTOR's negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the CITY. Should conflict of interest principles preclude a single legal counsel from representing both CITY and CONTRACTOR, or should CITY otherwise find CONTRACTOR’s legal counsel unacceptable, then CONTRACTOR shall reimburse the CITY its costs of defense, including without limitation reasonable legal counsels fees, expert fees and all other costs and fees of
8.b
Packet Pg. 1430 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-3
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
litigation. The CONTRACTOR shall promptly pay any final judgment rendered against the CITY (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the CONTRACTOR’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement.
CONTRACTOR obligations under this section apply regardless of whether or not such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of CITY under any provision of this agreement, CONTRACTOR shall not be required to indemnify and hold harmless CITY for liability attributable to the active negligence of CITY, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where CITY is shown to have been actively negligent and where CITY active negligence accounts for only a percentage of the liability involved, the obligation of CONTRACTOR will be for that entire portion or percentage of liability not attributable to the active negligence of CITY.
VII. PREVAILING WAGES
A. Wage rates for this Project shall be in accordance with the “General Wage Determination Made by the Director of Industrial Relations Pursuant To California Labor Code, Part 7, Chapter 1, Article 2, Sections 1770, 1771, 1773, 1773.1, 1774 and 1815", for Imperial County. Wage rates shall conform to those posted at www.cityofelcentro.org under the RFP and Bids City website section for this project and the Project site.
B. The following Labor Code sections are hereby referenced and made a part of this Agreement:
1. Section 1775 - Penalty for Failure to Comply with Prevailing Wage Rates.
2. Section 1777.4 - Apprenticeship Requirements.
3. Section 1777.5 - Apprenticeship Requirements.
4. Section 1813 - Penalty for Failure to Pay Overtime.
5. Sections 1810 and 1811 - Working Hour Restrictions.
6. Section 1775 - Payroll Records.
7. Section 1773.8 - Travel and Subsistence Pay.
8. Section 1776 – Payroll Records
VIII. RECORD AUDIT
In accordance with Government Code Section 8546.7, records of both the CITY and the
8.b
Packet Pg. 1431 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-4
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR shall be subject to examination and audit by the Auditor General for a period of three (3) years after final payment.
IX. CERTIFICATIONS
A. Contractor shall have a Class A License.
X. FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the Agreement Sum, shall be paid by the CITY to the CONTRACTOR no sooner than thirty-five (35) days after a Notice of Completion has been recorded, unless otherwise stipulated in the Notice of Completion, provided the work has then been completed, the Agreement fully performed, and a final Certificate for Payment has been issued by the Architect.
XI. CONTRACTOR'S FAILURE TO PROCURE COMPLETION OF PROJECT In the event CONTRACTOR fails to furnish tools, equipment, or labor in the necessary quantity or quality, or fails to prosecute the work or any part thereof contemplated by this Agreement in a diligent and workmanlike manner, and if the CONTRACTOR for a period of three (3) calendar days after receipt of written demand from CITY or its designated representative to do so, fails to furnish tools, equipment, or labor in the necessary quantity or quality, and to prosecute its work and all parts thereof in a diligent and workmanlike manner, or after commencing to do so within said three (3) calendar days, fails to continue to do so; then the CITY may exclude the CONTRACTOR from the premises, or any portion thereof, and take possession of said premises or any portion thereof, together with all material and equipment thereon, and may complete the work contemplated by this Agreement or any portion of said work, either by furnishing the tools, equipment, labor or material necessary, or by letting the unfinished portion of said work, or the portion taken over by the CITY to another contractor or by a combination of such methods. In any event, the procuring of the completion of said work, or the portion thereof taken over by the CITY, shall be a charge against the CONTRACTOR, and may be deducted from any money due or becoming due to CONTRACTOR from the CITY, or the CONTRACTOR shall pay the CITY the amount of said charge, or the portion thereof unsatisfied. The sureties provided for under this Agreement shall become liable for payment should CONTRACTOR fail to pay in full any said cost incurred by the CITY.
XII. INSURANCE
Prior to the beginning of and throughout the duration of the Work, CONTRACTOR and its subcontractors shall maintain insurance in conformance with the requirements set forth below. CONTRACTOR will use existing coverage to comply with these requirements. If that existing coverage does not meet the requirements set forth herein, CONTRACTOR agrees to amend, supplement or endorse the existing coverage to do so.
CONTRACTOR acknowledges that the insurance coverage and policy limits set forth in this section constitute the minimum amount of coverage required. Any insurance proceeds available to CONTRACTOR or its subcontractors in excess of the limits and coverage
8.b
Packet Pg. 1432 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-5
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
identified in this Agreement and which is applicable to a given loss, claim or demand, will be equally available to CITY.
A. CONTRACTOR shall provide the following types and amounts of insurance:
Without limiting CONTRACTOR’s indemnification of CITY, and prior to commencement of Work, CONTRACTOR shall obtain, provide and maintain at its own expense during the term of this Agreement, policies of insurance of the type and amounts described below and in a form satisfactory to CITY.
General liability insurance. CONTRACTOR shall maintain commercial general liability insurance with coverage at least as broad as Insurance Services Office form CG 00 01, in an amount not less than $2,000,000 per occurrence, $4,000,000 general aggregate, for bodily injury, personal injury, and property damage, and a $2,000,000 completed operations aggregate. The policy must include contractual liability that has not been amended. Any endorsement restricting standard ISO “insured contract” language will not be accepted.
Automobile liability insurance. CONTRACTOR shall maintain automobile insurance at least as broad as Insurance Services Office form CA 00 01 covering bodily injury and property damage for all activities of the CONTRACTOR arising out of or in connection with Work to be performed under this Agreement, including coverage for any owned, hired, non-owned or rented vehicles, in an amount not less than $1,000,000 combined single limit for each accident.
Umbrella or excess liability insurance. CONTRACTOR shall obtain and maintain an umbrella or excess liability insurance that will provide bodily injury, personal injury and property damage liability coverage at least as broad as the primary coverages set forth above, including commercial general liability and employer’s liability. Such policy or policies shall include the following terms and conditions:
• A drop down feature requiring the policy to respond in the event that any primary insurance that would otherwise have applied proves to be uncollectable in whole or in part for any reason;
• Pay on behalf of wording as opposed to reimbursement; • Concurrency of effective dates with primary policies; • Policies shall “follow form” to the underlying primary policies; and • Insureds under primary policies shall also be insureds under the umbrella or excess policies.
Workers’ compensation insurance. CONTRACTOR shall maintain Workers’ Compensation Insurance (Statutory Limits) and Employer’s Liability Insurance (with limits of at least $1,000,000) for CONTRACTOR’s employees in accordance with the laws of the State of California, Section 3700 of the Labor Code. In addition, CONTRACTOR shall require each subcontractor to similarly maintain Workers’ Compensation Insurance and Employer’s Liability Insurance in accordance with the laws of the State of California, Section 3700 for all of the subcontractor’s employees.
8.b
Packet Pg. 1433 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-6
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR shall submit to CITY, along with the certificate of insurance, a Waiver of Subrogation endorsement in favor of CITY, its officers, agents, employees and volunteers.
Pollution liability insurance. Environmental Impairment Liability Insurance shall be written on a CONTRACTOR’s Pollution Liability form or other form acceptable to CITY providing coverage for liability arising out of sudden, accidental and gradual pollution and remediation. The policy limit shall be no less than $1,000,000 dollars per claim and in the aggregate. All activities contemplated in this Agreement shall be specifically scheduled on the policy as “covered operations.” The policy shall provide coverage for the hauling of waste from the project site to the final disposal location, including non-owned disposal sites.
Builder’s risk insurance. Upon commencement of construction and with approval of AGENCY, CONTRACTOR shall obtain and maintain builder’s risk insurance for the entire duration of the Project until only the AGENCY has an insurable interest. The Builder’s Risk coverage shall include the coverages as specified below.
The named insureds shall be CONTRACTOR and AGENCY, including its officers, officials, employees, and agents. All Subcontractors (excluding those solely responsible for design Work) of any tier and suppliers shall be included as additional insureds as their interests may appear. CONTRACTOR shall not be required to maintain property insurance for any portion of the Project following transfer of control thereof to AGENCY. The policy shall contain a provision that all proceeds from the builder’s risk policy shall be made payable to the AGENCY. The AGENCY will act as a fiduciary for all other interests in the Project.
Policy shall be provided for replacement value on an "all risk" basis for the completed value of the project. There shall be no coinsurance penalty or provisional limit provision in any such policy. Policy must include: (1) coverage for any ensuing loss from faulty workmanship, Nonconforming Work, omission or deficiency in design or specifications; (2) coverage against machinery accidents and operational testing; (3) coverage for removal of debris, and insuring the buildings, structures, machinery, equipment, materials, facilities, fixtures and all other properties constituting a part of the Project; (4) Ordinance or law coverage for contingent rebuilding, demolition, and increased costs of construction; (5) transit coverage (unless insured by the supplier or receiving contractor), with sub-limits sufficient to insure the full replacement value of any key equipment item; (6) Ocean marine cargo coverage insuring any Project materials or supplies, if applicable; (7) coverage with sub-limits sufficient to insure the full replacement value of any property or equipment stored either on or off the Site or any staging area. Such insurance shall be on a form acceptable to Agency to ensure adequacy of terms and sublimits and shall be submitted to the Agency prior to commencement of construction.
8.b
Packet Pg. 1434 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-7
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Other provisions or requirements
Proof of insurance. CONTRACTOR shall provide certificates of insurance to CITY as evidence of the insurance coverage required herein, along with a waiver of subrogation endorsement for workers’ compensation. Insurance certificates and endorsements must be approved by CITY’s risk manager prior to commencement of performance. Current certification of insurance shall be kept on file with CITY at all times during the term of this contract. CITY reserves the right to require complete, certified copies of all required insurance policies, at any time.
Duration of coverage. CONTRACTOR shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property, which may arise from or in connection with the performance of the Work hereunder by CONTRACTOR, his agents, representatives, employees or subcontractors.
CONTRACTOR must maintain general liability and umbrella or excess liability insurance for as long as there is a statutory exposure to completed operations claims. CITY and its officers, officials, employees, and agents shall continue as additional insureds under such policies.
Primary/noncontributing. Coverage provided by CONTRACTOR shall be primary and any insurance or self-insurance procured or maintained by CITY shall not be required to contribute with it. The limits of insurance required herein may be satisfied by a combination of primary and umbrella or excess insurance. Any umbrella or excess insurance shall contain or be endorsed to contain a provision that such coverage shall also apply on a primary and non-contributory basis for the benefit of CITY before the CITY’s own insurance or self-insurance shall be called upon to protect it as a named insured.
City’s rights of enforcement. In the event any policy of insurance required under this Agreement does not comply with these requirements or is canceled and not replaced, CITY has the right but not the duty to obtain the insurance it deems necessary and any premium paid by CITY will be promptly reimbursed by CONTRACTOR or CITY will withhold amounts sufficient to pay premium from CONTRACTOR payments. In the alternative, CITY may cancel this Agreement.
Acceptable insurers. All insurance policies shall be issued by an insurance company currently authorized by the Insurance Commissioner to transact business of insurance or is on the List of Approved Surplus Line Insurers in the State of California, with an assigned policyholders’ Rating of A- (or higher) and Financial Size Category Class VII (or larger) in accordance with the latest edition of Best’s Key Rating Guide, unless otherwise approved by the CITY’s risk manager.
Waiver of subrogation. All insurance coverage maintained or procured pursuant to this agreement shall be endorsed to waive subrogation against CITY, its elected or appointed officers, agents, officials, employees and volunteers or shall specifically allow CONTRACTOR or others providing insurance evidence in compliance with these specifications to waive their right of recovery prior to a loss. CONTRACTOR hereby waives its own right of recovery against CITY, and shall require similar written express waivers and insurance clauses from each of its sub consultants.
8.b
Packet Pg. 1435 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-8
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Enforcement of contract provisions (non estoppel). CONTRACTOR acknowledges and agrees that any actual or alleged failure on the part of the CITY to inform CONTRACTOR of non-compliance with any requirement imposes no additional obligations on the CITY nor does it waive any rights hereunder.
Requirements not limiting. Requirements of specific coverage features or limits contained in this Section are not intended as a limitation on coverage, limits or other requirements, or a waiver of any coverage normally provided by any insurance. Specific reference to a given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be all inclusive, or to the exclusion of other coverage, or a waiver of any type. If the CONTRACTOR maintains higher limits than the minimums shown above, the CITY requires and shall be entitled to coverage for the higher limits maintained by the CONTRACTOR. Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be available to the CITY.
Notice of cancellation. CONTRACTOR agrees to oblige its insurance agent or broker and insurers to provide to CITY with a thirty (30) day notice of cancellation (except for nonpayment for which a ten (10) day notice is required) or nonrenewal of coverage for each required coverage.
Additional insured status. General liability policies shall provide or be endorsed to provide that CITY and its officers, officials, employees, agents, and volunteers shall be additional insureds under such policies. This provision shall also apply to any excess/umbrella liability policies.
Prohibition of undisclosed coverage limitations. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to CITY and approved of in writing.
Separation of insureds. A severability of interests provision must apply for all additional insureds ensuring that CONTRACTOR’s insurance shall apply separately to each insured against who claim is made or suit is brought, except with respect to the insurer’s limits of liability. The policy(ies) shall not contain any cross-liability exclusions.
Pass through clause. CONTRACTOR agrees to ensure that its sub-consultants, subcontractors, and any other party involved with the project that is brought onto or involved in the project by CONTRACTOR, provide the same minimum insurance coverage and endorsements required of CONTRACTOR. CONTRACTOR agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. CONTRACTOR agrees that upon request, all agreements with consultants, subcontractors, and others engaged in the project will be submitted to CITY for review.
City’s right to revise requirements. The CITY reserves the right at any time during the term of the contract to change the amounts and types of insurance required by giving the CONTRACTOR a ninety (90) day advance written notice of such change. If such change results in substantial additional cost to the CONTRACTOR, the CITY and CONTRACTOR may renegotiate CONTRACTOR’s compensation.
8.b
Packet Pg. 1436 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-9
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Self-insured retentions. Any self-insured retentions must be declared to and approved by CITY. CITY reserves the right to require that self-insured retentions be eliminated, lowered, or replaced by a deductible. Self-insurance will not be considered to comply with these specifications unless approved by CITY.
Timely notice of claims. CONTRACTOR shall give CITY prompt and timely notice of claims made or suits instituted that arise out of or result from CONTRACTOR’s performance under this Agreement, and that involve or may involve coverage under any of the required liability policies.
Additional insurance. CONTRACTOR shall also procure and maintain, at its own cost and expense, any additional kinds of insurance, which in its own judgment may be necessary for its proper protection and prosecution of the Work.
XIII. CONTRACTOR'S LICENSE
CONTRACTOR must possess at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing. CONTRACTOR shall ensure that any subcontractor working on the Project possesses at the time of commencing work and throughout the Project duration, a Contractor's License, issued by the State of California, which is current and in good standing.
XIV. REGISTRATION REQUIREMENTS
Pursuant to Section 1771.1(a) of the Labor Code:
“A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, as defined in this chapter, unless currently registered and qualified to perform public work pursuant to Section 1725.5. It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions Code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded.” CONTRACTOR must be registered with the Department of Industrial Relations (DIR) of the State of California in order to be eligible to work on public works projects.
CONTRACTOR must ensure registration with the DIR that is active and in good standing.
No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
8.b
Packet Pg. 1437 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-10
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
The CONTRACTOR is not subject to public works requirements (including registration with the DIR) if the public works project is under $1,000, unless the CITY knows that the same CONTRACTOR will be awarded total project costs in excess of $1,000 for a given year.
XV. CORPORATION IN GOOD STANDING
If CONTRACTOR is a corporation, the undersigned hereby represents and warrants that the corporation is duly incorporated and in good standing in the State of California, and that , whose title is , is authorized to act for and bind the corporation.
XVI. PROVISIONS REQUIRED BY LAW
Each and every provision of law and clause required by law to be inserted in this Agreement shall be deemed to be inserted herein and the Agreement shall be read and enforced as though it were included herein, and if through mistake or otherwise any such provision is not inserted, or is not currently inserted, then upon application of either party the Agreement shall forthwith be physically amended to make such insertion or correction.
XVII. SUBSURFACE HAZARDOUS MATERIALS
A. In the event trenches or other excavations extend deeper than four (4) feet below the surface, the CONTRACTOR shall promptly, and before the following conditions are disturbed, notify the CITY in writing of any:
1. Material that the CONTRACTOR believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code that is required to be removed to a Class I, Class II or Class III disposal site in accordance with the provisions of existing law.
2. Subsurface or latent physical conditions at the site differing from those indicated.
3. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in the Work or the character provided for in the CONTRACT.
B. Upon receipt of said notification the CITY will investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the CONTRACTOR's cost of or the time required for performance of any part of the work, the CITY will issue a change order under the procedures described in the General Conditions.
C. In the event that a dispute arises between the CITY and the CONTRACTOR whether the conditions materially differ, or involve hazardous waste or cause a decrease or increase in the CONTRACTOR's cost of or time required for performance of any part of the work, the CONTRACTOR shall not be excused from any scheduled completion date provided for by the Agreement, but shall proceed with all work to be performed under the Agreement. The CONTRACTOR shall
8.b
Packet Pg. 1438 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-11
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
retain any and all rights provided either by Agreement or by law which pertain to the resolution of disputes and protests between the contracting parties.
XVIII.LIQUIDATED DAMAGES
Pursuant to Government Code Section 53069.85, if work is not completed within the contract time or in strict accordance with the Project Schedule, it is understood, acknowledged and agreed that the CITY will suffer damage. It is therefore agreed that the CONTRACTOR shall pay to the CITY the sum of two thousand dollars ($2,000) for each and every calendar day of delay beyond the Contract Time, or beyond any completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule, or beyond the time indicated in the Project Schedule for any individual Contract activity.
CONTRACTOR expressly understands, acknowledges and agrees that such liquidated damages can and shall be imposed if the CONTRACTOR does not meet each and every aspect of any activity schedule, completion schedule, construction schedule or Project milestones established in or pursuant to the Project Schedule. If the CITY accepts work or makes any payment under this Agreement after a default by reason of delays, the acceptance of such work and/or payment(s) shall in no respect constitute a waiver or modification of any provisions regarding Contract Time, a completion schedule, the Project Schedule or the accrual of liquidated damages. In the event the same is not paid, the CONTRACTOR further agrees that the CITY may deduct the amount thereof from any money due or that may become due the CONTRACTOR under the Agreement. This Article does not exclude recovery of damages under provisions of the Contract Documents, and is expressly in addition to the CITY’s ability to seek other damages.
CONTRACTOR is to refer to Section Project Construction Schedule for duration of individual activities. Liquidated damages may be assessed if any individual activity duration exceeds the time indicated for that activity on the Project Construction Schedule.
XIX. CLAIM PROCEDURES UNDER PUBLIC CONTRACT CODE SECTION 9204 CONTRACTOR shall comply with the procedure set forth in Public Contracts Code section 9204 for any claim, as that term is defined therein, for one or more of the following: 1) a time extension, including, without limitation, for relief from damages or penalties for delay, 2) payment of money or damages arising from work done pursuant to this Agreement, and/or 3) payment of an amount disputed by the AGENCY under this Agreement.
XX. COMPONENT PARTS OF THE CONTRACT
This Agreement entered into consists of the following CONTRACT DOCUMENTS, all of which are component parts of the Agreement as if herein set out in full or attached hereto:
Notice Inviting Bids Proposed Subcontractors
Scope of Summary Bid Bond
8.b
Packet Pg. 1439 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) AGREEMENT 00500BA-12
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Information for Bidders Information Required of Bidder
Bid Form Contract
Non-Collusion Affidavit Certificate Re. Worker’s Compensation Site Visit Certification Drug-free Workplace Certification Faithful Performance Bond Plans and Specifications
Labor and Materials Payment Bond Addenda
General Conditions Drawings
Supplementary General Conditions Change Orders
Special Conditions Shop Drawings Transmittals
All of the above named CONTRACT DOCUMENTS are intended to be complementary.
Work required by one of the above named CONTRACT DOCUMENTS and not by others shall be done as if required by all.
XXI. ENTIRE CONTRACT
This Agreement constitutes the entire contract of the parties. No other agreements or contracts, whether oral or written, pertaining to the work to be performed, exist between the parties. This Agreement can be modified only by an amendment in writing, signed by both parties.
CONTRACTOR CITY
City of El Centro
By: ____________________________ By: ____________________________ Title: __________________________ Title: __________________________ Date: __________________________ Date: __________________________ ATTACHMENTS:
Non-collusion Affidavit
Faithful Performance Bond
Labor and Materials Bond
8.b
Packet Pg. 1440 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) PERFORMANCE BOND 00610BA-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SECTION 00610A
PERFORMANCE BOND
Whereas, The City Council of the City of El Centro, State of California, and _________________________________ (hereinafter designated as “principal”) have entered into an agreement whereby principal agrees to install and complete certain designated public improvements, which said agreement, dated __________, 20__, and identified as project _______________________________________________, is hereby referred to and made a part hereof; and
Whereas, Said principal is required under the terms of said agreement to furnish a bond for the faithful performance of said agreement.
Now, therefore, we, the principal and _____________________________________, as surety, are held and firmly bound unto the City of El Centro (hereinafter designated as “El Centro”) in the penal sum of ____________________ dollars ($__________) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, successors, executors and administrators, jointly and severally, firmly by these presents.
The condition of this obligation is such that if the above-bounded principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and provisions in the said agreement and any alteration thereof made as therein provided, on his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless El Centro, its officers, agents and employees, as therein stipulated, then this obligation shall become null and void; otherwise it shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face amount specified therefor, there shall be included costs and reasonable expenses and fees, including reasonable attorney’s fees, incurred by El Centro in successfully enforcing such obligation, all to be taxed as costs and included in any judgment rendered.
The surety hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Agreement or to the work to be performed thereunder or the specifications accompanying the same shall in anywise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Agreement or to the work or to the specifications.
8.b
Packet Pg. 1441 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) PERFORMANCE BOND 00610BA-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
In Witness Whereof, this instrument has been duly executed by the principal and surety above named, on ______________________, 20__.
(SEAL) (SEAL)
(CONTRACTOR) (Surety)
By: By:
(Signature) (Signature)
-END OF PERFORMANCE BOND8.b
Packet Pg. 1442 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) PAYMENT BOND 00620A-1
PAYMENT BOND
Whereas, the City Council of the City of El Centro, State of California, and ________________________ (hereinafter designated as ''the Principal") have entered into an Agreement dated _________________ and described as
________________________________________________________________ _______________________________________________________________ whereby the Principal agrees to install and complete certain designated public improvements identified as _________________________which are part of City project ________________________________________________, and which Agreement is hereby referred to and made a part hereof; and
Whereas, under the terms of the Agreement, the Principal is required before entering upon the performance of the work to file a good and sufficient payment bond with the City of El Centro to secure the claims referenced in Civil Code Sections 9550 et seq.; and Now, therefore, the Principal and the undersigned as corporate surety, are held firmly bound unto the City of El Centro and all contractors, subcontractors, laborers, materialmen, and other persons employed in the performance of the Agreement and referenced in Sections 9550 et seq of the Civil Code in the sum of
_________________________________________dollars ($________________), for materials furnished or labor thereon of any kind, or for amounts due under the Unemployment Insurance Act with respect to this work or labor, that the surety will pay the same in an amount not exceeding the amount hereinabove set forth, and also in case suit is brought upon this bond, will pay, in addition to the face amount thereof, costs and reasonable expenses and fees, including reasonable attorney's fees, incurred by the City of El Centro in successfully enforcing this obligation, to be awarded and fixed by the court, and to be taxed as costs and to be included in the judgment therein rendered.
It is hereby expressly stipulated and agreed that this bond shall inure to the benefit of any and all persons, companies, and corporations entitled to file claims under Section 9550 et seq of the Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond.
Should the condition of this bond be fully performed, then this obligation shall become null and void, otherwise it shall be and remain in full force and effect.
The surety hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Agreement or the specifications accompanying the same shall in any manner affect its obligations on this bond, and it does hereby waive notice of any such change, extension, alteration, or addition.
In witness whereof, this instrument has been duly executed by
8.b
Packet Pg. 1443 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) PAYMENT BOND 00620A-2
the principal and surety above named, on___________, 20 _______________________________ _________________________ (CONTRACTOR) (Surety)
By:___________________________ By:_______________________________ (Signature) (Signature)
-END OF PAYMENT BOND8.b
Packet Pg. 1444 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) WORKERS COMPENSTATION CERTIFICATE 00660A-1
WORKERS’ COMPENSATION CERTIFICATE
(AS REQUIRED BY SECTION 1861
OF THE CALIFORNIA LABOR CODE)
I am aware of the provisions of section 3700 of the Labor Code which require every employer to be insured against liability for Workers’ Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the WORK of this Agreement.
CONTRACTOR:_______________________________________
By:_______________________________________
Title:_______________________________________
- END OF WORKERS’ COMPENSATION CERTIFICATE –
8.b
Packet Pg. 1445 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SECTION 00700H
GENERAL CONDITIONS
ARTICLE 1 -- DEFINITIONS
Wherever used in these General Conditions or in the other Contract Documents the following terms have the meanings indicated which are applicable to both the singular and plural thereof.
Where an entire word is capitalized in the definitions and is found uncapitalized in the Contract Documents it has the ordinary dictionary definition.
Addenda - Written or graphic instruments issued prior to the opening of Bids which make additions, deletions, or revisions to the Contract Documents.
Agent - The CONSTRUCTION MANAGER is the Agent of the OWNER.
Agreement- The written contract between the OWNER and the CONTRACTOR covering the WORK to be performed; other documents are attached to the Agreement and made a part thereof as provided therein.
Allowance - A Bid item that adds a specified quantity of WORK to the Agreement WORK scope which the OWNER may unilateral direct the CONTRACTOR to perform, or elect not to have performed.
Apparent Low Bidder - The Bidder whose Bid, having been publicly opened and read aloud, meets all the material requirements of the Bidding Documents, the CITY deems responsive in accordance with the OWNER's municipal code, and whose Bid price is the lowest received.
Application for Payment - The form furnished by the CONSTRUCTION MANAGER which is to be used by the CONTRACTOR to request progress or Final Payment and which is to be accompanied by such supporting documentation as is required by the Contract Documents.
Asbestos - Any material that contains more than one percent ( l%) asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.
Beneficial Occupancy - Use by the OWNER of the entire WORK prior to final acceptance.
Bidder - Any individual, firm, partnership, corporation, or combination thereof, submitting a Bid for the WORK, acting directly or through a duly authorized representative.
Bid - The offer or proposal of the Bidder submitted on the prescribed form setting forth the price or prices for the WORK.
8.b
Packet Pg. 1446 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Bidding Documents - The advertisement or invitation to Bid, instructions to Bidders, the Bid form, and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).
Bonds - Bid, Performance, and Payment Bonds and other instruments which protect against loss due to inability or refusal of the CONTRACTOR to perform the Agreement.
Change Order - A document recommended by the CONSTRUCTION MANAGER, which is signed by the CONTRACTOR and the OWNER and authorizes an addition, deletion, or revision in the WORK, or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement.
CITY - OWNER (See OWNER's definition in this section).
City of El Centro - OWNER (See OWNER's definition in this section).
Claims - A dispute becomes a claim only after the CONTRACTOR receives and refuses to accept the CONSTRUCTION MANAGER's initial determination, and is certified as required by Article 16.3.
Codes - The terms Government Code, Labor Code, etc. refer to codes of the State of California.
CONSTRUCTION MANAGER - The individual, partnership, corporation, joint venture or other legal entity named as such by written notice from the OWNER.
Construction Manager Order - A written order issued by the CONSTRUCTION MANAGER which clarifies or interprets the Procurement Documents or orders minor changes or alterations in the scope of WORK to be furnished but which does not involve a change in the Contract Price or the Contract Time.
Contract Documents - The Notice Inviting Bids, Instructions to Bidders, Bid Forms (including the Bid, Bid schedule(s), information required of Bidder, Bid Bond, and all required certificates and affidavits), Agreement, Performance Bond, Payment Bond, General Conditions, Special Conditions, Supplementary General Conditions, Technical Specifications, Drawings, and all Addenda, and Change Orders executed pursuant to the provisions of the Contract Documents.
Contract Milestone - A principal event specified in the Contract Documents relating to an intermediate completion date of a portion of the WORK, or a period of time within which the portion of the WORK should be performed prior to Substantial Completion of all the WORK.
Contract Price - The total monies payable by the OWNER to the CONTRACTOR under the terms and conditions of the Contract Documents.
Contract Time - The number of successive calendar Days stated in the Contract Documents for the completion of the WORK.
8.b
Packet Pg. 1447 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-3
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR - The individual, partnership, corporation, joint venture or other legal entity with whom the OWNER has executed the Agreement.
Day- A calendar day of twenty-four (24) hours measured from midnight to the next midnight unless otherwise specified. Working day means a day on which there is work on the project.
Business day means a business day for the City.
Defective Work- Work that is unsatisfactory, faulty, or deficient; or that does not conform to the Contract Documents; or that does not meet the requirements of any inspection, reference standard, test, or approval referred to in the Contract Documents; or work that has been damaged by anyone other than the OWNER prior to the CONSTRUCTION MANAGER's recommendation of final payment.
DESIGN CONSULTANT- The individual, partnership, corporation, joint venture or other legal entity named as such in the Contract Documents or succeeding entity.
Demobilization - The complete dismantling and removal by the CONTRACTOR of all of the CONTRACTOR's temporary facilities, equipment and personnel at the site.
Drawings - The drawings. plans, maps, profiles, diagrams, and other graphic representations which indicate the character, location, nature, extent. and scope of the WORK and which have been prepared by the DESIGN CONSULTANT and are referred to in the Contract Documents. Shop Drawings are not Drawings as so defined.
Disputed Work - A dispute exists from the time the CONTRACTOR disagrees with a decision or determination made by the CONSTRUCTION MANAGER until the CONSTRUCTION MANAGER renders an initial determination. If the issue is unresolved it becomes a claim.
Effective Date of the Agreement - The date indicated in the Agreement on which it becomes effective, but if no such date is indicated it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.
Engineer - Wherever the word ''Engineer'' is found in these Contract Documents or in any referenced document, it shall mean the CONSTRUCTION MANAGER.
Field Order - A written order issued by the CITY which changes the Agreement WORK scope and involves a change in the Contract Price or Contract Time or the intent of the Agreement.
Final Payment - is defined as the last progress payment made to the CONTRACTOR for earned funds, less retainage as applicable, less deductions listed in A11icle 14. The CONTRACTOR is entitled to this payment when the Notice of Completion is issued.
General Conditions - Section 00700 of the Contract Documents.
General Requirements - Division 1 of the Technical Specifications.
8.b
Packet Pg. 1448 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-4
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Hazardous Waste - The term Hazardous Waste shall have the meaning provided in Section 104 of the Solid Waste Disposal Act (42 USC §6903) as amended from time to time or, as defined in Health and Safety Code §25117, that is required to be removed to a class I, class IL or class III disposal site in accordance with provisions of existing law, whichever is more restrictive.
Holidays- The CITY's legal holidays occur on:
New Year's Day- January 1
Martin Luther King's Birthday - Third Monday in January President's Day- Third Monday in February
Good Friday- The afternoon of the Friday before Easter
Memorial Day - Last Monday in May
June 19th - Juneteenth
Independence Day -July 4
Labor Day - First Monday in September
Veterans Day- November 11
Thanksgiving Day- Fourth Thursday in November
The day after Thanksgiving- The Friday after the fourth Thursday in November Christmas Eve- The afternoon of December 24
Christmas Day - December 25
New Year's Eve- The afternoon of December 31
If any holiday listed above falls on a Saturday, Saturday and the preceding Friday are both legal holidays. If the holiday should fall on a Sunday, Sunday and the following Monday are both legal holidays.
Interfacing Work - Work which connects to. abuts, or meets with work of another contractor.
Laws and Regulations - Any and all applicable laws, rules, regulations, ordinances, Codes, and/or orders of any and all governmental bodies, agencies, authorities and courts having jurisdiction.
Lump Sum Work - Work to be paid on the basis of lump sum prices.
Mechanic's Lien - A form of security, an interest in real property, which is held to secure the payment of an obligation. When referred to in these Contract Documents, "Mechanic's Lien" or "lien'' means "Stop Notice.''
Milestone - See Contract Milestone.
Mobilization - The establishment by the CONTRACTOR of the temporary facilities, equipment and personnel at the site thereby enabling the WORK to commence.
8.b
Packet Pg. 1449 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-5
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Notice of Award - The written notice by the OWNER to the apparent successful Bidder stating that upon compliance by the apparent successful Bidder with the conditions precedent enumerated therein within the time specified, the OWNER will enter into an Agreement.
Notice of Completion -A form signed by the DESIGN CONSULTANT, the CONSTRUCTION MANAGER and the CONTRACTOR recommending to the OWNER that the WORK is complete and fixing the date of completion. After acceptance of the WORK by the OWNER's governing body, the form is signed by the OWNER and filed with the County Recorder. This filing starts the thirty (30) Day lien filing period on the WORK.
Notice to Proceed - The written notice issued by the OWNER to the CONTRACTOR authorizing the CONTRACTOR to proceed with the WORK and establishing the date of commencement of the Contract Time.
OWNER's Agent - The CONSTRUCTION MANAGER is the OWNER's Agent.
OWNER - The City of El Centro, acting through its legally designated officials, officers, or employees.
Partial Utilization - Use by the OWNER of a substantially completed part of the WORK for the purpose for which it is intended prior to Substantial Completion of all the WORK. (See Beneficial Occupancy.)
PCBs - Polychlorinated biphenyls.
Petroleum - Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (sixty (60) degrees Fahrenheit and fourteen and seventenths (14.7) pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge. oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Wastes and crude oils.
Project - The total construction of which the WORK to be provided under the Contract Documents may be the whole, or a part as indicated elsewhere in the Contract Documents.
Radioactive Material - Source, special nuclear, or byproduct material as .defined by the Atomic Energy Act of 1954 (42 USC §§2011 et seq.) as amended from time to time.
Request for Information - The standardized form furnished by the OWNER for the CONTRACTOR's use when making written requests for information to the CONSTRUCTION MANAGER, and upon which the response will be answered and returned.
Request for Proposal - The standardized form used by the CONSTRUCTION MANAGER to request a proposal from the CONTRACTOR for proposed changes in the WORK.
Samples - Physical examples of materials, equipment, or workmanship that are representative of some portion of the WORK and which establish the standards by which such portion of the WORK will be judged.
8.b
Packet Pg. 1450 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-6
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Safety - Safety includes health and security.
Shop Drawings - All drawings, diagrams, illustrations, schedules and other data which are specifically prepared by or for the CONTRACTOR and submitted by the CONTRACTOR to illustrate some portion of WORK and all illustrations, brochures, standard schedules, performance charts, instructions, and diagrams to illustrate material or equipment for some portion of the WORK.
Specifications - The directions, provisions, and requirements contained in the BIDDING
REQUIREMENTS, CONTRACT FORMS, CONDITIONS OF THE CONTRACT AND THE TECHNICAL SPECIFICATIONS DIVISIONS THROUGH [as listed in the Table of Contents].
Stop Notice - A legal remedy for Subcontractors and Suppliers who contribute to public works, but who are not paid for their work, which secures payment from construction funds possessed by the OWNER. For public property, the Stop Notice remedy is designed to substitute for Mechanic's Lien rights.
Submittals - The information which is specified for submission to the CONSTRUCTION MANAGER in accordance with Article 6.20 of the General Conditions.
Sub-Consultant - The individual, partnership, corporation, joint venture or other legal entity having a direct contract with DESIGN CONSULTANT, the CONSTRUCTION MANAGER or with any of their Consultants to furnish services with respect to the Project and who is identified as such in the Supplementary General Conditions.
Subcontractor - An individual, partnership, corporation, joint venture or other legal entity having a direct contract with the CONTRACTOR or with any other Subcontractor for the performance of a part of the WORK at the site.
Substantial Completion - Refers to when the WORK has progressed to the point where, in the opinion of the CONSTRUCTION MANAGER as evidenced by Notice of Substantial Completion as applicable, it is sufficiently complete, in accordance with the Contract Documents, so that the WORK can be utilized for the purposes for which it is intended, and after the operation demonstration is complete, where applicable.
SPECIAL PROVISIONS – That section of the Contract Documents consisting of written technical descriptions of products and execution of the WORK.
Supplementary General Conditions - The part of the Contract Documents which make additions, deletions, or revisions to these General Conditions.
Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor.
8.b
Packet Pg. 1451 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-7
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Technical Specifications - Divisions 1 through 16 of the Contract Documents consisting of the General Requirements and written technical descriptions of products and execution of the WORK.
Underground Facilities - All pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasement containing such facilities which have been installed underground to furnish any of the following services or materials:
electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water.
Unit Price Work - Specific WORK scope included in the Agreement WORK scope to be paid for on the basis of unit prices. The OWNER may unilaterally direct the CONTRACTOR to perform the WORK, or elect not to have the WORK performed.
WORK - The entire completed construction or the various separately identifiable parts thereof required to be furnished under the Contract Documents. WORK is the result of performing, or furnishing labor and furnishing and incorporating materials and equipment into the construction, and performing or furnishing services and furnishing documents, all as required by the Contract Documents.
Work Change Directive - A written directive to the CONTRACTOR issued on or after the Effective Date of the Agreement and recommended by CONSTRUCTION MANAGER, and signed by the OWNER ordering an addition, deletion or revision in the WORK, or responding to differing or unforeseen physical conditions under which the WORK is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Time, but is evidence that the parties expect that the change directed or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by the parties as to its effect, if any, on the Contract Price or the Contract Time.
ARTICLE 2 --PRELIMINARY MATTERS
2.1 DELIVERY OF BONDS/INSURANCE CERTIFICATES - At the time required for the CONTRACTOR to deliver the signed Agreements to the OWNER, the CONTRACTOR shall also deliver to the OWNER such Bonds and insurance policies and certificates as the CONTRACTOR may be required to furnish in accordance with the Contract Documents.
2.2 COPIES OF DOCUMENTS - The OWNER shall furnish to the CONTRACTOR ten (l0) copies of the Contract Documents as specified in the Agreement and ten (10) sets of full-scale Drawings. Additional quantities of the Contract Documents will be furnished at reproduction cost.
2.3 COMMENCEMENT OF CONTRACT TIME; NOTICE TO PROCEED - The Contract Time will start to run on the commencement date stated in the Notice to Proceed.
2.4 STARTING THE WORK - The CONTRACTOR shall begin to perform the WORK within ten (1 0) Days after the commencement date stated in the Notice to Proceed, but no work
8.b
Packet Pg. 1452 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-8
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
shall be done at the site prior to said commencement date. In addition, any requirements in the Supplemental General Conditions must be satisfied.
2.5 CONTRACTOR MUST STUDY CONTRACT DOCUMENTS - Before undertaking each part of the WORK, the CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures shown thereon and all applicable field measurements. The CONTRACTOR shall promptly report in writing to the CONSTRUCTION MANAGER any conflict, error, or discrepancy which the CONTRACTOR may discover and shall obtain a written interpretation or clarification from the CONSTRUCTION MANAGER before proceeding with any work affected thereby.
2.6 PRELIMINARY SUBMITTALS - Preliminary Submittals shall be provided to the CONSTRUCTION MANAGER in accordance with Division 1 requirements.
2.7 PER-CONSTRUCTION CONFERENCE - The CONTRACTOR is required to attend a preconstruction conference. That conference will be attended by the CONSTRUCTION MANAGER and others as appropriate, as determined by the CONSTRUCTION MANAGER, in order to discuss the WORK in accordance with the applicable procedures specified in the General Requirements.
2.8 SUBCONTRACTOR MOBILIZATION MEETING - Prior to the start of each major Subcontractor's site work, the CONTRACTOR, the involved Subcontractor and the CONSTRUCTION MANAGER shall attend a pre-start meeting to discuss the schedule, coordination, procedures and other administrative issues.
2.9 CONTRACTOR DUTY TO ADVISE OWNER OF KNOWN OR DISCOVERED PROBLEMS - The CONTRACTOR is reminded of the obligation to advise the OWNER of any errors and/or omissions in the Contract Documents, or changes to thereof; which the CONTRACTOR may be aware through special knowledge or discovered during the Bid process.
ARTICLE 3 --CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
3.1 INTENT - The Contract Documents comprise the entire agreement between the OWNER and the CONTRACTOR concerning the WORK. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. The Contract Documents will be construed in accordance with the laws of the State of California and Federal laws as applicable.
3.2 INTENT OF WORK TO BE FUNCTIONALLY COMPLETE
3.2.1 Work to be Complete - It is the intent of the Contract Documents to describe the WORK, to be constructed in accordance with the Contract Documents. Any work. materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result shall be supplied whether or not specifically called for or identified in the Contract Documents. When words or phrases which have a well-known technical or construction industry or trade meaning are used to describe work, materials, or equipment such words or phrases shall be interpreted in
8.b
Packet Pg. 1453 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-9
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
accordance with that meaning unless a definition has been provided in Article l of the General Conditions.
3.2.2 Necessary Utilities - If utilities to equipment/fixtures are not shown but are necessary to operate the equipment/fixtures, then the utilities service installation is considered to be part of the WORK. The implied WORK will conform to the appropriate sections of the technical Specifications.
3.3 CLARIFICATIONS AND INTERPRETATIONS OF THE CONTRACT
DOCUMENTS
3.3.1 Referenced Standards - Reference to standard specifications, manuals, or codes of any technical society, organization, or association, or to the Laws and Regulations of any governmental authority, whether such reference be specific or by implication, shall mean the latest standard specification, manual, code or Laws and Regulations in effect at the time of opening of Bids, except as may be otherwise specifically stated. However, no provision of any referenced standard specification, manual, or code shall be effective to change the duties and responsibilities of the OWNER, the CONTRACTOR, or the CONSTRUCTION MANAGER or any of their consultants, Agents, or employees from those set forth in the Contract Documents.
3.3.2 Discovery of Problem Notice - If, during the performance of the WORK, the CONTRACTOR discovers any conflict, error, ambiguity or discrepancy with the work within the Contract Documents or between the Contract Documents and any provision of any such Laws and Regulations applicable to the performance of the WORK or of any such standard, specification, manual or code or of any instruction of any Supplier, then the CONTRACTOR shall report it to CONSTRUCTION MANAGER in writing within seven (7) calendar Days after discovery. The CONTRACTOR shall not proceed with the WORK affected thereby, except in an emergency, unless directed by the CONSTRUCTION MANAGER. Any WORK performed by the CONTRACTOR that the CONSTRUCTION MANAGER has not directed be performed shall be done at the CONTRACTOR's own risk.
3.3.3 Order of Precedence of Contract Documents - In resolving cont1icts resulting from errors or discrepancies in any of the Contract Documents, the order of precedence shall be as follows:
3.3.3.1 Permits from other agencies as may be required by law;
3.3.3.2 Change Orders;
3.3.3.3 Agreement;
3.3.3.4 Addenda;
3.3.3.5 Contractor's Bid (Bid Form);
3.3.3.6 Notice Inviting Bids;
3.3.3.7 Instructions to Bidders;
3.3.3.8 Supplementary General Conditions;
3.3.3.9 General Conditions
3.3.3.10 Technical Specifications
3.3.3.11 Drawings;
8.b
Packet Pg. 1454 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-10
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
3.3.3.12 Referenced Standard Specifications; and
3.3.3.13 Greenbook, latest edition.
3.3.4 Order of Precedence of the Drawings - With reference to the Drawings the order of precedence is as follows:
3.3.4.1 Figures govern over scaled dimensions;
3.3.4.2 Detail drawings govern over general drawings;
3.3.4.3 Addenda/Change Order drawings govern over Contract Drawings; and
3.3.4.4 Contract Drawings govern over standard drawings.
3.4 AMENDING AND SUPPLEMENTING CONTRACT DOCUMENTS
3.4.1 Amending Contract Documents - The Contract Documents may be amended to provide for additions, deletions, and revisions in the WORK or to modify the terms and conditions thereof by a Change Order pursuant to Article 10.
3.4.2 Supplementing Contract Documents - The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by:
3.4.2.1 - A Construction Manager Order issued by the CONSTRUCTION MANAGER;
3.4.2.2 - DESIGN CONSULTANT's approval of a Shop Drawing or Sample pursuant to Article 6; or
3.4.2.3 - DESIGN CONSULTANT's written interpretation or clarification.
3.5 REUSE OF DOCUMENTS - Neither the CONTRACTOR, nor any Subcontractor or Supplier, nor any other person or organization performing any of the WORK under a contract with the OWNER shall have or acquire any title to or ownership rights in any of the Drawings, Technical Specifications, or other documents used on the WORK and they shall not reuse any of them on the extensions of the Project or any other project without written consent of the OWNER.
ARTICLE 4 -- AVAILABILITY OF LANDS; PHYSICAL CONDITIONS; REFERENCE POINTS
4.1 AVAILABILITY OF LANDS - The OWNER shall furnish, as indicated in the Contract Documents, the lands upon which the WORK is to be performed, rights-of-way and easements for access thereto, and such other lands which are designated for the use of the CONTRACTOR.
Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by the OWNER, unless otherwise provided in the Contract Documents. Nothing contained in the Contract Documents shall be interpreted as giving the CONTRACTOR exclusive occupancy of the lands or rights-of-way provided. The CONTRACTOR shall provide, at no additional cost, for all additional lands and access thereto that may be required for temporary construction facilities, borrow areas, waste disposal areas, or storage of materials
8.b
Packet Pg. 1455 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-11
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
and equipment; provided, that the CONTRACTOR shall not enter upon nor use any property not under the control of the OWNER until a written temporary construction easement agreement has been executed by the CONTRACTOR and the property owner, and a copy of said easement furnished to the CONSTRUCTION MANAGER prior to said use; and. neither the OWNER nor the CONSTRUCTION MANAGER shall be liable for any claims or damages resulting from the CONTRACTOR's unauthorized trespass or authorized use of any such properties.
4.2 PHYSICAL SITE CONDITIONS
4.2.1 Reports and Drawings - Reference is made to the Supplementary General Conditions for identification of:
4.2.1.1 Subsurface Condition Reports - Those reports of explorations and tests of subsurface conditions at or contiguous to the site that have been utilized by DESIGN CONSULTANT in preparing the Contract Documents; and
4.2.1.2 Drawings of Existing Structures - Reference is made to the Supplementary General Conditions for identification of those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Utilities referred to in Section 4.4 of Article 4 herein) which are at or contiguous to the site that have been utilized in the preparation of the Contract Documents.
4.2.2 Limited Reliance By the CONTRACTOR On The Technical Data - The CONTRACTOR may rely upon the accuracy of the technical data contained in such drawings or reports, however, nontechnical data. interpretations, and opinions contained in such drawings or reports are not to be relied on by the CONTRACTOR. The CONTRACTOR may not rely upon or make any claims against the OWNER, DESIGN CONSULTANT, or CONSTRUCTION MANAGER with respect to:
4.2.2.1 the completeness of such reports and drawings for the CONTRACTOR's purposes, including, but not limited to, any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by the CONTRACTOR and Safety precautions and programs incident thereto;
4.2.2.2 other data, interpretations, opinions, and information contained m such reports or shown or indicated in such drawings; or
4.2.2.3 any interpretation by the CONTRACTOR of or conclusion drawn from any "technical data" or any such data, interpretations, opinions or information.
4.3 DIFFERING SITE CONDITIONS - If the CONTRACTOR believes any subsurface or physical condition at or contiguous to the site that is uncovered or revealed either:
8.b
Packet Pg. 1456 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-12
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
4.3.1 is of such a nature as to establish any "technical data" on which the CONTRACTOR is entitled to rely as provided in paragraphs 4.2.1 is materially inaccurate;
4.3.2 is of such a nature as to require a change in the Contract Documents;
4.3.3 differs materially from that shown or indicated in the Contract Documents; or
4.3.4 is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; he shall immediately report it to the Construction Manager; then
4.3.4.1 the CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions thereby or performing any work in connection therewith (except in an emergency or unforeseen which may include war, government regulations, labor disputes, strikes, fires, floods, adverse weather or elements necessitating cessation of work, inability to obtain materials, labor or equipment, required extra work, or other specific events as may be deemed an emergency by the OWNER), notify the OWNER and CONSTRUCTION MANAGER in writing about such condition. The CONTRACTOR shall not further disturb such conditions or perform any work in connection therewith (except as aforesaid) until receipt of written order to do so.
4.3.5 OWNER Responsibility - The OWNER shall promptly investigate the conditions. and if it finds that the conditions do materially so differ, and cause a decrease or increase in the CONTRACTOR's cost of, or the time required for, performance of any part of the work shall issue a Change Order under the procedures described in Article 10. If the OWNER determines that there is no bona fide work scope change or is a minor change which does not impact time or cost, he shall notify the CONTRACTOR of this finding within thirty (30) Days.
4.3.6 Disputed Work - If the CONTRACTOR and the CITY are unable to reach agreement on Disputed Work, the CITY may direct the CONTRACTOR to proceed with the work. Payment shall be as later directed by mediation or arbitration, if the CITY and the CONTRACTOR agree thereto, or as fixed in a court of law. Although not to be construed as proceeding under extra work provisions, the CONTRACTOR shall keep and furnish records of Disputed Work in accordance with paragraph 11.3.
4.3.7 Disallowance of Entitlement - The CONTRACTOR shall not be entitled to any adjustment in the Contract Price or the Contract Time or will be deemed to have waived his right to such a claim if:
4.3.7.1 the CONTRACTOR knew of the existence of such conditions at the time the CONTRACTOR made a final commitment to the OWNER with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract;
4.3.7.2 the existence of such condition could reasonably have been discovered or revealed as a result of any examination, investigation of the site and contiguous areas suggested or required by the Bidding Documents; or
8.b
Packet Pg. 1457 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-13
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
4.3.7.3 the CONTRACTOR failed to give the written notice within the time and as required by Article 3.3.2.
4.4 UNDERGROUND UTILITIES
4.4.1 Utilities Indicated - The information and data indicated in the Contract Documents with respect to existing Underground Utilities at or contiguous to the site are based on information and data furnished to the OWNER or the CONSTRUCTION MANAGER by the owners of such Underground Utilities or by others. Unless it is expressly provided in the Supplementary General Conditions and/or the General Requirements, the OWNER and the CONSTRUCTION MANAGER shall not be responsible for the accuracy or completeness of any such information or data, and the CONTRACTOR shall have full responsibility for reviewing and checking all such information and data, for locating all Underground Utilities indicated in the Contract Documents, for coordination of the WORK with the owners of such Underground Utilities during construction, for the Safety and protection thereof and repairing any damage thereto resulting from the WORK, the cost of which will be considered as having been included in the Contract Price.
4.4.2 Utilities Not Indicated - If an Underground Utility is uncovered or revealed at or contiguous to the site which was not indicated in the Contract Documents and which the CONTRACTOR could not reasonably have been expected to be aware of, then the CONTRACTOR shall identify the owner of such Underground Utility and give written notice thereof to that owner and shall notify the CONSTRUCTION MANAGER in accordance with the requirements of the General Conditions and General Requirements.
4.4.3 Action Prior To Starting Work - As provided in California Government Code §4216.2, at least two (2) working Days prior to commencing any excavation, the CONTRACTOR shall contact the regional notification center (Underground Service Alert of Southern California) and obtain an inquiry identification number.
4.4.4 Locate Utilities - The CONTRACTOR shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. Full compensation for such work shall be considered as included in the CONTRACTOR's Bid price.
4.4.5 Protection Of Utilities - The CONTRACTOR shall not interrupt the service function or disturb the support of any utility, without authority from the OWNER or order from the utility owner. All valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff. Where protection is required to ensure support of utilities located as shown on the Plans, the CONTRACTOR shall, unless otherwise provided, furnish and place the necessary protection at its expense.
4.4.6 Notification Requirements If Utility Disturbed - The CONTRACTOR shall immediately notify the CONSTRUCTION MANAGER and utility owner if any utility is
8.b
Packet Pg. 1458 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-14
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
disturbed or damaged. The CONTRACTOR shall bear the costs of repair or replacement of any utility damaged by the CONTRACTOR.
4.4.7 Removal Of Abandoned Utilities - Unless otherwise specified, the CONTRACTOR shall remove all interfering portions of utilities shown on the Plans or indicated in the Bidding Documents as ''abandoned." Before starting removal operations, the CONTRACTOR shall ascertain from the utility owner whether the abandonment is complete. The costs involved in the removal and disposal shall be included in the price for the item of work necessitating such removals.
4.4.8 Relocation Of Utilities
4.4.8.1 When the Plans or Specifications provide for the CONTRACTOR to alter, relocate, or reconstruct a utility, all costs for such work shall be included in the Bid.
4.4.8.2 Temporary or permanent relocation or alteration of indicated utilities requested by the CONTRACTOR for its convenience shall be its responsibility, and the CONTRACTOR shall make all arrangements and bear all costs.
4.4.8.3 After award of the Agreement, portions of utilities not indicated in the Contract Documents which are found to interfere with the WORK may be relocated, altered or reconstructed by the utility owner, or the CONSTRUCTION MANAGER may order changes in the WORK to avoid interference. Such changes will be paid for in accordance with Article 10.
4.4.9 Delays
4.4.9.1 The CONTRACTOR shall immediately notify in writing the utility owner and the CONSTRUCTION MANAGER of its construction schedule and any subsequent changes in the construction schedule which will affect the time available for protection, removal or relocation of utilities.
4.4.9.2 The CONTRACTOR will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, as noted in the Contract Documents.
4.4.9.3 The CONTRACTOR may be given a no cost extension of time for unforeseen delays attributable to unreasonably protracted interferences by others in the relocation of utilities.
4.4.10 Access to the WORK - When necessary, the CONTRACTOR shall so conduct its operations as to permit access to the WORK site and provide time for utility work to be accomplished during normal work hours during the progress of the WORK.
4.5 REFERENCE POINTS
4.5.1 Bench Mark - The CONSTRUCTION MANAGER will provide one (I) benchmark, near or on the site of the WORK, and will provide two (2) points near or on the site to establish a base line for use by the CONTRACTOR for alignment control. Unless otherwise specified in the
8.b
Packet Pg. 1459 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-15
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
General Requirements, the CONTRACTOR shall furnish all other lines, grades, and benchmarks required for proper execution of the WORK.
4.5.2 Protection of Bench Marks - The CONTRACTOR shall preserve all bench marks, stakes, and other survey marks, and in case of their removal or destruction by any party, the CONTRACTOR shall be responsible for the accurate replacement of such reference points by personnel qualified under Division 3, Chapter 15 of the California Business and Professions Code. The CONTRACTOR shall report to the CONSTRUCTION MANAGER whenever a reference point is lost destroyed, or requires relocation.
4.6 ASBESTOS, PCBS, PETROLEUM, HAZARDOUS WASTE OR RADIOACTIVE
MATERIAL
4.6.1 OWNER Responsibility - The OWNER shall be responsible for any hazardous material which includes hazardous substances and Hazardous Waste as defined by Health and Safety Code §§25316 and 25117. uncovered or revealed at the site which was not identified in the Contract Documents to be within the scope of the WORK. The OWNER shall not be responsible for any such materials brought to the site by the CONTRACTOR, Subcontractors, Suppliers or anyone else for whom the CONTRACTOR is responsible.
4.6.2 CONTRACTOR's Responsibility - When such hazardous material is encountered, the CONTRACTOR shall immediately stop all Work in connection with such hazardous condition in any area affected thereby (except in an emergency as required by Article 6), and notify the OWNER and CONSTRUCTION MANAGER in writing. The OWNER shall promptly evaluate such hazardous condition and take corrective action. The CONTRACTOR shall not be required to resume work in any such affected area until after the OWNER has delivered to the CONTRACTOR written notice specifying that such condition and any affected area has been rendered safe for the reassumption of work, or specifying any special conditions under which such work may be resumed safely.
4.6.3 Dispute - If after receipt of such special written notice the CONTRACTOR does not agree to resume work based on a reasonable belief it is unsafe, or does not agree to resume work under such special conditions, then the OWNER may order such portion of the work that is in connection with such hazardous condition or in such affected area to be deleted from the work.
The OWNER may have such deleted portion of the work performed by the OWNER's own forces or others in accordance with Article 7. If the OWNER and the CONTRACTOR cannot agree as to entitlement to or the amount or extent of an adjustment, if any, in Contract Price or Contract Time as a result of work stoppage or of deleting such portion of the work, then either patty may make a Claim as provided in Article 16.
4.6.4 Deleted
ARTICLE 5 -- BONDS AND INSURANCE
5.1 PERFORMANCE , PAYMENT AND OTHER BONDS
8.b
Packet Pg. 1460 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-16
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
5.1.1 Bond Requirement - The CONTRACTOR shall furnish Performance and Payment Bonds, each in the amount set forth in the Supplementary General Conditions as security for the faithful performance and payment of all the CONTRACTOR's obligations under the Contract Documents. Those Bonds shall remain in effect at least until one (1) year after the filing date of Notice of Completion, except as otherwise provided by Laws and Regulations or by the Contract Documents. The CONTRACTOR shall also furnish such other Bonds as are required by the Supplementary General Conditions.
5.1.2 Licensed Surety - All Bonds shall be in the form prescribed by the Contract Documents and by such sureties which are admitted insurers in the State of California and are subject to regulation by the Department of Insurance, and which also satisfy the requirements stated in Code of Civil Procedure §995.660, except as provided otherwise by Laws and Regulations.
All Bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. Surety companies must be duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds for the limits so required. Such surety companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary General Conditions.
5.1.3 Bankrupt or Insolvent Surety - If the surety on any Bond furnished by the CONTRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the WORK is located, then the CONTRACTOR shall within seven (7) Days thereafter substitute another Bond and Surety, which must be acceptable to the OWNER per paragraph 5.1.1 and 5.1.2 above.
5.2 NOT USED
ARTICLE 6- CONTRACTOR'S RESPONSIBILITIES
6.1 Responsibility Of CONTRACTOR To Perform - Unless otherwise specified in the Contract Documents, the CONTRACTOR shall furnish and assume full responsibility for all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, and all other facilities and incidentals necessary for the furnishing, performance, testing, start-up, and completion of the WORK. Such support that may need to be provided after normal working hours will be provided by the CONTRACTOR at its expense.
6.2 Labor, Materials and Equipment - All materials and equipment to be incorporated into the WORK shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of the OWNER. lf required by the CONSTRUCTION MANAGER, the CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the kind and quality of materials and equipment. All materials and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned in accordance with the instructions of the applicable Supplier except as otherwise provided in the Contract Documents; but no provisions of any such instructions will be effective to assign to the CO'\JSTRUCTION MANAGER, any duty or authority to supervise or direct the furnishing or performance of the WORK.
8.b
Packet Pg. 1461 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-17
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.2.1 The completed work shall include all necessary permanent Safety devices, such as machinery guards, emergency stops and similar Safety items required by the United States Occupational Safety and Health Administration ("OSHA''), the California Division of Occupational Safety and Health (''Cal/OSHA"), and other Federal, State and local health and Safety regulations. In addition, all equipment products, components. and/or package systems shall be designed, fabricated, and installed in compliance with Seismic Zone 4 structural criteria.
Further, any features of the work (including OWNER-selected equipment) subject to such Safety regulations and structural criteria shall be fabricated, furnished, and installed in compliance with Seismic Zone 4 structural criteria. The CONTRACTOR shall include provisions of this Article in his agreements with Subcontractors, Suppliers and manufacturers of equipment and/or products. In selecting and/or accepting equipment and/or products for installation in the WORK, the OWNER, DESIGN CONSULTANT, and CONSTRUCTION MANAGER assume no responsibility for the injury, property damage, or any other damages or claims resulting from failure of the equipment, products, components and/or package systems to comply with applicable Safety codes or requirements, or the Safety requirements of a recognized City, or failure due to manufacturer's faulty design concepts, or defective workmanship and materials. The CONTRACTOR shall defend, indemnify, and hold the OWNER, DESIGN CONSULTANT, and CONSTRUCTION MANAGER harmless against any and all liability, claims, suits, damages, costs or expenses caused or claimed to be caused in whole or in part by the negligence or willful misconduct of the CONTRACTOR connected with the construction of the Project. However, this indemnity will not extend to any loss, damage or expense caused by the established sole negligence or willful misconduct of the OWNER or the OWNER's Agents, servants or independent contractors.
6.3 SUPERVISION, SUPERINTENDENCE AND QUALITY - The CONTRACTOR shall supervise, inspect, and direct the WORK competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the WORK in accordance with the Contract Documents. The CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction and Safety
precautions and programs incidental thereto. The CONTRACTOR shall be responsible to see that the completed WORK complies accurately with the Contract Documents. The CONTRACTOR is solely responsible for the quality of the WORK.
6.4 SUPERINTENDENT
6.4.1 Written Designation of Superintendent - The CONTRACTOR shall designate in writing and keep on the work site at all times during its progress a technically qualified, Englishspeaking superintendent and an alternate who are employees of the CONTRACTOR and who shall not be replaced without written notice to the OWNER and the CONSTRUCTION MANAGER. The superintendent will be the CONTRACTOR's representative at the site and shall have authority to act on behalf of the CONTRACTOR. All communications given to the superintendent shall be as binding as if given to the CONTRACTOR. The CONTRACTOR shall issue all its communications to the OWNER and DESIGN CONSULTANT through the CONSTRUCTION MANAGER.
8.b
Packet Pg. 1462 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-18
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.4.2 Superintendent's Presence at Site - The CONTRACTOR's superintendent or alternate shall be present at the site of the WORK at all times while work is in progress. and shall be available by phone for emergencies twenty-four (24) hours per Day, seven (7) Days per week.
Failure to observe this requirement shall be considered suspension of the WORK by the CONTRACTOR until such time as such the superintendent is again present at the site.
6.4.3 Removal of Superintendent - Upon written notice, the OWNER may require replacement and removal from the WORK of the CONTRACTOR's superintendent with cause, in which case the CONTRACTOR shall submit a replacement superintendent subject to approval by the OWNER, at no increase in Contract Price or Contract Time. Repeated Safety violation on the job site will be sufficient grounds for directing such replacement.
6.5 LABOR - The CONTRACTOR shall provide competent, suitably qualified personnel to survey and lay out the WORK and perform construction as required by the Contract Documents.
Any person employed, who is found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable, or who fails or refuses to perform work properly, acceptably, and safely, shall be immediately removed from the WORK by the CONTRACTOR and not be reemployed on the WORK. The CONTRACTOR shall furnish, erect, maintain, and remove the construction plant and any temporary works as may be required. The CONTRACTOR shall at all times maintain good discipline and order at the site, and will not permit the use or consumption of drugs (illegal substances) or alcoholic beverages at the site.
6.5.1 No Additional Compensation for Overtime - Except as otherwise provided in this Article, the CONTRACTOR shall receive no additional compensation for overtime work, (i.e., work in excess of eight (8) hours in any one (1) calendar Day or forty (40) hours in any one (I) calendar week,) even though such overtime work may be required under emergency conditions and may be ordered by the CO STRUCTION MANAGER in writing. Additional compensation will be paid the CONTRACTOR for overtime work only in the event extra work is ordered by the CONSTRUCTION MANAGER, and the Change Order specifically authorizes the use of overtime work and then only to such extent as overtime wages are regularly being paid by the CONTRACTOR for overtime work of a similar nature in the same locality.
6.5.2 Approval Required to Work Outside Normal Work Hours - Except in connection with the Safety or protection of persons or the WORK or properly at the site or adjacent thereto, and except as otherwise indicated in the Contract Documents, all work at the site shall be performed during normal working hours, and the CONTRACTOR will not permit overtime work or the performance of work on Saturday, Sunday, or any Holiday observed by CITY without the OWNER's written consent. The CONTRACTOR shall apply for this consent through the CONSTRUCTION MANAGER. The CONSTRUCTION MANAGER has to approve the CONTRACTOR working Holidays, weekends, or overtime. The CONTRACTOR will be responsible for reimbursing the OWNER for all cost to provide inspection services required to monitor WORK outside of normal WORK hours. The CONTRACTOR will be charged for this actually incurred direct hourly cost plus the OWNER approved overhead cost plus the OWNER approved profit, and a deductive Change Order will be issued to cover this expense.
8.b
Packet Pg. 1463 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-19
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.5.3 SUBCONTRACT LIMITATIONS - The CONTRACTOR shall perform not less than twenty percent (20%) of the WORK with its own forces without subcontracting.
This requirement refers to the WORK whose value will not be less than twenty percent (20%) of the Contract Price.
6.6 PROGRESS SCHEDULE - The CONTRACTOR shall adhere to the progress schedule established in accordance with the General Requirements as it may be adjusted from time to time as provided below:
6.6.1 Non Impacting Adjustments - The CONTRACTOR shall submit to the Construction MANAGER for acceptance proposed adjustments in the progress schedule that will not change the Contract Time (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto.
6.6.2 Revisions To Milestones -Proposed revisions in the progress schedule that will change the Contract Time (or Milestones) shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order in accordance with Article 12 of the General Conditions.
6.7 SUBSTITUTES OR "OR EQUAL" ITEMS - Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent or “or-equal” item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to OWNER for review under the circumstances described below.
6.7.1 “Or-Equal” Items: If in OWNER’s sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in the WORK will be required, it may be considered by OWNER as an “or-equal” item, in which case review and approval of the proposed item may, in OWNER’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. A proposed item of material or equipment will be considered functionally equal to an item so named if:
a. in the exercise of reasonable judgment OWNER determines that:
i. it is at least equal in materials of construction, quality, durability, appearance, strength and design characteristics;
ii. it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the WORK as a functioning whole; iii. it has a proven record of performance and availability of responsive service; and
b. CONTRACTOR certifies that, if approved and incorporated into the WORK:
8.b
Packet Pg. 1464 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-20
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
i. there will be no increase in cost to OWNER or increase in Contract Time, and
ii. it will conform substantially to the detailed requirements of the item named in the Contract Documents.
6.7.2 Substitute Items
a. If in CONTRACT MANAGER’s sole discretion an item of material or equipment proposed by CONTRACTOR does not qualify as an “or-equal,” it will be considered a proposed substitute item.
b. CONTRACTOR shall submit sufficient information as provided below to allow CONTRACT MANAGER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefore. Requests for review of proposed substitute items of material or equipment will not be accepted by CONTRACT MANAGER from anyone other than CONTRACTOR.
c. The procedure requirements for review by CONTRACT MANAGER will be as set forth in Paragraph 6.7.2.d, and as CONTRACT MANAGER may decide is appropriate under the circumstances.
d. CONTRACTOR shall make written application to CONTRACT MANAGER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application:
i. shall certify that the proposed substitute item will:
1. perform adequately the functions and achieve the results called for by the general design,
2. be similar in substance to that specified, and
3. be suited to the same use as that specified;
ii. will state:
1. the extent, if any, to which the use of the proposed substitute item will prejudice CONTRACTOR’s achievement of Substantial
Completion on time;
2. whether or not use of the proposed substitute item in the WORK will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for other work on the Project) to adapt the design to the proposed substitute item; and
3. whether or not incorporation or use of the proposed substitute item in connection with the WORK is subject to payment of any license fee or royalty;
iii. will identify:
1. all variations of the proposed substitute item from that specified, and
2. available engineering, sales, maintenance, repair and replacement services;
iv. and shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change.
8.b
Packet Pg. 1465 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-21
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.7.3 Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence or procedure of construction is expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence or procedure of construction approved by CONTRACT MANAGER. CONTRACTOR shall submit sufficient information to allow CONTRACT MANAGER, in CONTRACT MANAGER’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The requirements for review by CONTRACT MANAGER will be similar to those provided in Paragraph 6.7.2.d.
6.7.4 Contract Manager’s Evaluation: CONTRACT MANAGER will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs
6.7.2.d and 6.7.3. CONTRACT MANAGER may require CONTRACTOR to furnish additional data about the proposed substitute item. CONTRACT MANAGER will be the sole judge of acceptability. No “or equal” or substitute will be ordered, installed or utilized until CONTRACT MANAGER’s review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an “or equal.” CONTRACT MANAGER will advise CONTRACTOR in writing of any negative determination.
6.7.5 Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR’s expense a special performance guarantee or other surety with respect to any substitute.
6.7.6 Contract Manager’s Cost Reimbursement: CONTRACT MANAGER will record CONTRACT MANAGER’s costs in evaluating a substitute proposed or submitted by CONTRACTOR pursuant to Paragraphs 6.7.2.d and 6.7.3. Whether or not CONTRACT MANAGER approves a substitute item so proposed or submitted by CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of CONTRACT MANAGER for evaluating each such proposed substitute. CONTRACTOR shall also reimburse OWNER for the charges of CONTRACT MANAGER for making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER) resulting from the acceptance of each proposed substitute.
6.7.7 CONTRACTOR’s Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-equal” at CONTRACTOR’s expense
6.8 PROJECT SITE COORDINATION
6.8.1 Work By Others - The CONTRACTOR shall be responsible for ascertaining the nature and extent of any simultaneous, collateral and essential work by others as described in the General Requirements.
6.8.2 Coordination Of Work - The OWNER, the CONTRACTOR and each of such workers, contractors and others, shall cooperate to minimize interference.
8.b
Packet Pg. 1466 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-22
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.8.3 Cost Of Coordination - The CONTRACTOR shall include in its Bid all costs involved as a result of coordinating its work with others. The CONTRACTOR will not be entitled to 1 additional compensation from the OWNER for damages resulting from such simultaneous, collateral and essential work. His sole and exclusive remedy as a third party beneficiary to other prime contractors for damages caused by another contractor will be a direct action against the separate contractor. If necessary to avoid or minimize such damage or delay, then the CONTRACTOR shall redeploy its work force to other parts of the WORK.
6.8.4 Obligation to Provide Access - The CONTRACTOR shall afford each other contractor who is a party to such a direct contract and each utility owner (or the OWNER, if the OWNER is performing the additional work with the OWNER's employees) proper and safe access to the site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such work, and shall properly connect and coordinate work performed by others with their WORK as described in these Contract Documents.
6.8.5 The CONTRACTOR shall do all cutting, fitting and patching of the WORK that may be required to make its several parts come together properly and integrate with such other work.
6.8.6 The CONTRACTOR shall not endanger any work of others by cutting, excavating or otherwise altering their work and will only cut or alter their work with the written consent of the CONSTRUCTION MANAGER and the others whose work will be affected.
6.9 COORDINATION WITH SUBCONTRACTORS AND SUPPLIERS
6.9.1 The CONTRACTOR shall be solely responsible for scheduling and coordinating the work of Subcontractors. Suppliers and other persons and organizations performing or furnishing any of the WORK under a direct or indirect contract with the CONTRACTOR.
The CONTRACTOR shall require all Subcontractors, Suppliers and such other persons and organizations performing or furnishing any of the work to communicate with the CONSTRUCTION MANAGER through the CONTRACTOR. All work performed by a Subcontractor or Supplier will be pursuant to an appropriate agreement between the CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents.
6.9.2 Subcontractor has no contractual relationship with the 0\VNER. Nothing contained in this Article shall create any contractual relationship between any Subcontractor and the OWNER or the CONSTRUCTION MANAGER, nor relieve the CONTRACTOR of any liability or obligation under the prime contract. The CONTRACTOR shall include these General Conditions and the Supplementary General Conditions as a part of all its subcontract agreements.
6.9.3 DIVISION OF WORK - The divisions and sections of the Specifications and the identifications of any Drawings shall not control the CONTRACTOR in dividing the WORK among Subcontractors or Suppliers or delineating the WORK to be performed by any specific trade.
8.b
Packet Pg. 1467 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-23
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.10 PATENT FEES AND ROYALTIES - The CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the WORK or the incorporation in the WORK of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the WORK and if to the actual knowledge of the OWNER, or the DESIGN CONSULTANT, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by the OWNER in the Contract Documents.
6.11 PERMITS - Unless otherwise provided in the Supplementary General Conditions, the CONTRACTOR shall obtain and pay for all construction permits and licenses from the agencies having jurisdiction, including the furnishing of insurance and Bonds if required by such agencies. The enforcement of such requirements under this Agreement shall not be made the basis for claims for additional compensation. The OWNER shall assist the CONTRACTOR, only when necessary, in obtaining such permits and licenses. The CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the WORK which are applicable at the time of opening of Bids. The CONTRACTOR shall pay all charges of utility owners for connections to the WORK.
6.12 LAWS AND REGULATIONS -The CONTRACTOR shall observe and comply with all Federal, State, and local laws, ordinances. Codes, orders, and regulations which in any manner affect those engaged or employed on the WORK. the materials used in the WORK, or the conduct of the WORK. If any discrepancy or inconsistency should be discovered in this Agreement in relation to any such law. ordinance, code, order. or regulation, the CONTRACTOR shall immediately report the same in writing to the CONSTRUCTION MANAGER.
6.13 TAXES - The CONTRACTOR shall pay all sales, consumer, use, and other similar taxes required to be paid in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the WORK. The CITY is not exempt from sales tax.
6.14 ANTITRUST CLAIMS - The CONTRACTOR or Subcontractor offers and agrees to assign to the OWNER all rights, title and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 [commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the Agreement and any subcontract. This assignment shall be made and become effective at the time the OWNER tenders Final Payment to the CONTRACTOR. without further acknowledgement by the parties.
6.15 USE OF PREMISES
8.b
Packet Pg. 1468 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-24
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.15.1 General - The CONTRACTOR shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Project site, the land and areas identified in and permitted by the Contract Documents, and the other land and areas permitted by Laws and Regulations, rights-of-way, permits, and easements as approved by the CONSTRUCTION MANAGER. The CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof or of any land or areas contiguous thereto, resulting from the performance of the WORK. Should any claim be made against the OWNER or the CONSTRUCTION MANAGER by any such owner or occupant because of the performance of the WORK, the CONTRACTOR shall promptly attempt to settle with such other party by agreement or otherwise resolve the claim through litigation.
6.16 PROJECT SITE MAINTENANCE AND INTERFERENCE WITH ADJACENT
PROPERTY
6.16.1 Cost of General Requirements in Contract Price - The CONTRACTOR is obligated to comply with the General Requirements. All costs associated with this compliance are to be included in the Contract Price.
6.16.2 Vehicle Load Limits - When materials are transported in prosecuting the WORK, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by Laws and Regulations. When it is necessary to cross curbs, sidewalks. or drainage facilities the CONTRACTOR shall protect them from damage.
6.16.3 Work Outside The Limits of The Contract Documents - Despite the designation of limits in the Contract Documents or the indication of temporary fences or barricades, the provisions of the Contract Documents governing certain portions of the WORK may require certain operations be carried out beyond such limits. In those cases, trenching, utility work, site development, landscaping, shall be scheduled so as to occasion a minimum of inconvenience or disturbance to or interference with the normal operation of the OWNER, those persons who property abuts the areas of that work and the public in general. The CONTRACTOR shall obtain the CONSTRUCTION MANAGER's prior approval and all necessary approvals from other agencies, public entities, or the Government for such operations, and prosecute such operations expeditiously and restore the premises affected to their original condition immediately upon completion of such operations, unless otherwise specified in the Contract Documents. All existing walks, roadways, paved or landscaped areas on which temporary driveways or walks are rerouted shall be restored to their original condition, immediately upon completion of those phases of the WORK, unless otherwise specified in the Contract Documents. Pumping, draining and control of surface and ground water shall be carried out so as to avoid endangering the WORK or any adjacent facility or property, or interrupting, restricting or otherwise infringing or interfering with its use.
6.16.4 Responsibilities For Damage - All damage, injury or loss to any persons or property caused, directly or indirectly, in whole or in part, by the CONTRACTOR, any Subcontractor, Supplier or any other person or organization directly or indirectly employed by any of them to perform or furnish any of the WORK or anyone for whose acts any of them may be liable, shall be remedied by the CONTRACTOR (except damage or loss attributable to the fault of Drawings
8.b
Packet Pg. 1469 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-25
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
or Specifications or to the acts or omissions of the OWNER or the CONSTRUCTION MANAGER or the DESIGN CONSULTANT). The CONTRACTOR's duties and responsibilities for Safety and for protection of the WORK shall continue until such time as all the WORK is completed and the CONSTRUCTION MANAGER has issued a notice to the OWNER and the CONTRACTOR in accordance with Article 14 that the WORK is complete.
6.17 CONTRACTOR'S DAILY REPORTS - The CONTRACTOR shall complete a daily report indicating his total manpower for each construction trade, major equipment on site, each Subcontractor's manpower, weather conditions, and any other items required by the CONSTRUCTION MANAGER. The daily report shall be completed on forms provided by the CONSTRUCTION MANAGER, and shall be submitted to the CONSTRUCTTON MANAGER by 9:00 a.m. the following working Day. The report should comment on the daily progress and status of the work within each major component of the work. These components will be decided by the CONSTRUCTION MANAGER. Submitting acceptable daily reports as required is a precondition to approval of the monthly progress payment. However, these reports are not to be used to meet the notice requirements contained elsewhere in the General Conditions.
6.18 SAFETY
6.18.1 Safety Plan - The CONTRACTOR will be required to comply with General Requirements provided by the CONSTRUCTION MANAGER. The CONTRACTOR shall submit a written Safety plan to the CONSTRUCTION MANAGER prior to commencement of any work on site. The CONTRACTOR shall be responsible for initiating, maintaining, and supervising all Safety precautions and programs in connection with the WORK.
6.18.2 Safety Laws and Regulations - The CONTRACTOR shall comply with all applicable Laws and Regulations of any public body having jurisdiction for the Safety of persons or property or to protect them from damage, injury, or loss and shall erect and maintain all necessary safeguards for such Safety and protection. The CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and utilities when prosecution of the WORK may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property.
6.18.3 Safety Representative - The CONTRACTOR shall designate a qualified and experienced Safety representative at the site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of Safety precautions and program.
The Safety representative must meet the qualifications specified in Section 01060 "Safety and Health."
6.18.4 Safety Orders - The CONTRACTOR shall have at the WORK site as applicable, copies or suitable extracts of: Construction Safety Orders, Tunnel Safety Orders, and General Industry Safety Orders issued by the State Division of Industrial Safety. The CONTRACTOR shall comply with provisions of these and all other applicable laws, ordinances, and regulations.
6.18.5 Trench Shoring Plan - Before excavating any trench five (5) feet or more in depth, the CONTRACTOR shall submit to the OWNER a detailed plan showing the design of shoring,
8.b
Packet Pg. 1470 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-26
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
bracing, sloping or other provisions to be made for the workers' protection from the hazard of caving ground during the excavation of such trench. If the plan varies from the shoring system standards, the plan shall be prepared by a California registered Civil CONSTRUCTION MANAGER. No excavation shall sta1t until the CONSTRUCTION MANAGER has accepted the plan and the CONTRACTOR has obtained a permit from the State Division of Industrial Safety. A copy of the permit shall be submitted to the CONSTRUCTION MANAGER and posted at the site.
6.18.6 Use of Explosives - Explosives may be used only when authorized in writing by the CONSTRUCTION MANAGER, or as otherwise stated in the Specifications. Explosives shall be handled, used, and stored in accordance with all applicable regulations. The CONSTRUCTION MANAGER's approval of the use of explosives shall not relieve the CONTRACTOR from liability for claims caused by blasting operations.
6.18.7 Hazardous Communication Program
6.18.7.1 Notification to employees is required when materials that contain hazardous substances or mixtures are required on the WORK. A material safety data sheet as described in Title 8 of the California Code of Regulations at §5194 shall be requested by the CONTRACTOR from the manufacturer of any hazardous product used.
6.18.7.2 Material usage shall be accomplished with strict adherence to California Division of Industrial Safety requirements and all manufacturer's warnings and application instructions listed on the material safety data sheet and on the product container label.
6.18.7.3 The CONTRACTOR shall be responsible for coordinating any exchange of material Safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the site in accordance with Laws and Regulations. with copies to the CONSTRUCTION MANAGER.
6.18.7.4 Unsafe Products - The CONTRACTOR shall notify the CONSTRUCTION MANAGER if it considers a specified or required product or its intended usage to be unsafe.
This notification must be given to the CONSTRUCTION MANAGER prior to the product being ordered, or if provided by some other party. prior to the product being used or incorporated in the WORK.
6.18.8 Safety Measures In Bid - Payment for performing all work necessary to provide Safety measures shall be included in the prices bid for other items of work except where separate Bid items for excavation Safety are provided.
6.18.9 Safety Reporting
6.18.9.1 Weekly First Aid Logs - This log should be delivered to the CONSTRUCTION MANAGER three (3) Days after the weekly reporting period.
6.18.9.2 Accident and Injury Reports - This report should be delivered within twenty-tour
8.b
Packet Pg. 1471 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-27
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
(24) hours of the injury or accident.
6.18.10 Construction Manager Safety Deficiency Report - The CONTRACTOR is required to respond to this report within two (2) working Days explaining his corrective action and proposed schedule for this action.
6.19 EMERGENCY - In emergencies affecting the Safety or protection of persons or the WORK or property at or adjacent to the site, the CONTRACTOR, without special instruction or authorization from the CONSTRUCTION MANAGER, is obligated to act to prevent threatened damage, injury or loss. The CONTRACTOR shall give the CONSTRUCTION MANAGER prompt written notice if the CONTRACTOR believes any significant changes in the WORK have resulted because of the action taken in response to an emergency. If it is determined by the OWNER a change is required, then a change shall be authorized by Change Order.
6.20 SHOP DRAWINGS AND SAMPLES
6.20.1 After checking and verifying all field measurements and after complying with applicable procedures specified in the General Requirements, the CONTRACTOR shall submit to the CONSTRUCTION MANAGER for the DESIGN CONSULTANT's review all Shop Drawings in accordance with the accepted schedule of Shop Drawings Submittals specified in Section 01300 "Bid Forms.''
6.20.2 The CONTRACTOR shall also submit to the CONSTRUCTION MANAGER for review all Samples in accordance with the accepted schedule of Sample Submittals specified in the General Requirements.
6.20.3 Before submittal of each Shop Drawing or Sample, the CONTRACTOR shall have determined and verified all quantities, dimensions, specified performance criteria, installation requirements, materials, catalog numbers, and similar data with respect thereto and reviewed or coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the WORK and the Contract Documents.
6.20.4 CONTRACTOR shall, in addition to any submittals required through the Special Provision or Technical Specifications, at his own expense, furnish for review, and obtain approval by the CONSTRUCTION MANAGER, three (3) copies each of detailed submittals for materials, installation drawings, and construction procedures for the following:
Any material which differ from that specified with a brand name on the Plans and in this Special Provisions
Dewatering Plan
Public notification flyers
Traffic control plans
Portland cement concrete design mix
Conventional Asphalt mixes
Class II Base
Tack Coat Oil
8.b
Packet Pg. 1472 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-28
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Manhole Lid
Manhole rings/bases
Valve Cans, Lids and watervalves
Pipes/fittings
Romtec system, pumps, electronic systems
Monument Well Can, Lid and/or material pertaining to the adjustment Monument Preservation Certificate (prior to any construction/demolition activities) Striping plans / Contractor notes
Striping Paint, Thermoplastic, reflective beads, pavement markers and other material pertaining to installation of new traffic striping
In addition, CONSTRUCTION MANAGER may, at his discretion, require shop drawings on other equipment or construction activities not included in the above list. CONSTRUCTION MANAGER shall have ten (10) working days to review and return the shop drawings to CONTRACTOR after receipt of said drawings.
6.21 SUBMITTAL ACCEPTANCE
6.21.1 DESIGN CONSULTANT Review Scope and Limitation - The DESIGN CONSULTANT will review and approve Shop Drawings and Samples. The DESIGN CONSULTANT's review and approval will be only to determine if the items covered by the Submittals will after installation or incorporation in the WORK, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. The DESIGN CONSULTANT's review and approval will not extend to means, methods, techniques, sequences or procedures of construction except where a particular means, method, technique, sequence or procedure of construction is specifically and expressly called for by the Contract Documents or to Safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.
The CONTRACTOR shall make corrections required by the DESIGN CONSULTANT, and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. The CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by the DESIGN CONSULTANT on previous Submittals.
6.21.2 CONTRACTOR's Responsibility Not Relieved By Approval - The CONSTRUCTION MANAGER, and the DESIGN CONSULTANT's review and approval of Shop Drawings or Samples shall not relieve the CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless the CONTRACTOR has in writing called the DESIGN CONSULTANT's attention to each such variation at the time of submission and the DESIGN CONSULTANT has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by the DESIGN CONSULTANT relieve the CONTRACTOR from responsibility for complying with the requirements of Article 6.
8.b
Packet Pg. 1473 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-29
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
6.22 COMPLIANCE WITH CONSTRUCTION MANAGER ADMINISTRATIVE PROCEDURES - The CONTRACTOR is required to comply with all the CONSTRUCTION MANAGER's administrative procedures including but not limited to daily reports, Requests for Proposal, safety reporting, notice requirements, payment procedures, submittal processing, attendance at weekly and special meetings, and others designated by the CONSTRUCTION MANAGER.
6.23 ASSIGNMENT OF AGREEMENT - The CONTRACTOR shall not assign, sublet, sell, transfer, or otherwise dispose of the Agreement or any portion thereof, or its right, title, or interest therein, or obligations thereunder, without the written consent of the OWNER except as imposed by law. If the CONTRACTOR violates this provision, the Agreement may be terminated at the option of the OWNER. In such event, then the OWNER shall be relieved of all liability and obligations to the CONTRACTOR and to its assignee or transferee, growing out of such termination.
6.24 CONTINUING THE WORK DURING DISPUTES
6.24.1 The CONTRACTOR shall carry on the WORK and adhere to the progress schedule during all disputes or disagreements with the OWNER over any WORK scope, price, or time dispute. No work shall be delayed or postponed pending resolution of any disputes or disagreements, except as the CONTRACTOR and the OWNER may otherwise agree in writing.
6.24.2 If the CONTRACTOR and the OWNER are unable to reach agreement on Disputed Work, then the OWNER may direct the CONTRACTOR to proceed with the WORK. Payment shall he as later determined by Article 16.
6.25 GENERAL WARRANTY AND GUARANTEE The CONTRACTOR is
responsible for providing warranty and guarantee in accordance with Article 13.
6.26 INDEMNIFICATION -CONTRACTOR shall provide the indemnification set out in the Agreement
6.26.1 Survival of Obligations - All representations, indemnifications, warranties and guarantees made in, required by or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive Final Payment, completion and acceptance of the WORK and termination or completion of the Agreement.
ARTICLE 7 --WORK BY OTHERS AT THE SITE
7.1 OWNER'S RIGHT TO WORK AT SITE - The OWNER may perform other work related to the Project at the site by the OWNER's own forces, have other work performed by utility owners, or let other direct contracts which may contain General Conditions similar to these. If the fact such other work is to be performed was not noted in the Contract Documents, then written notice thereof will be given to the CONTRACTOR prior to starting any such other work.
8.b
Packet Pg. 1474 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-30
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
7.2 CONTRACTOR REPORT ON DELAYS CAUSED BY OTHERS - If the proper execution or results of any part of the CONTRACTOR's work depends upon the work of any such other contractor or utility owner (or OWNER), then the CONTRACTOR shall promptly inspect and report to the CONSTRUCTION MANAGER in writing any apparent delays. defects, or deficiencies in such other work that render it unavailable or unsuitable for such proper execution and results. The CONTRACTOR's failure to report such delays, defects, or deficiencies in writing before commencement of the affected WORK will constitute an acceptance of the other work as "fit and proper for integration with the CONTRACTOR's work except for latent defects and deficiencies in the other work."
7.3 DAMAGE TO OTHERS CAUSED BY CONTRACTOR - If the CONTRACTOR causes damage to the work, property, or person of any other contractor employed by the OWNER, or if any claim arising out of the CONTRACTOR's performance of the WORK by any other contractor is made against the CONTRACTOR, by the OWNER, the CONSTRUCTION MANAGER, the DESIGN CONSULTANT, any other contractor, or any other person, then the CONTRACTOR shall be responsible to settle and shall promptly attempt to settle and resolve the dispute.
7.4 COORDINATION
7.4.1 Coordination Responsibilities - The CONTRACTOR's coordination responsibilities are in accordance with those found in Article 6 and in the described Supplementary General Conditions if applicable.
7.4.2 Coordination Delays - If the CONTRACTOR is delayed by the OWNER, and such delay could not reasonably have been foreseen and prevented by the CONTRACTOR, then the CONSTRUCTION MANAGER will determine the extent of the delay, the effect of the delay on the work as a whole, and any commensurate extension of time. The CONSTRUCTION MANAGER shall arrange meetings with other contractors performing work on behalf of the OWNER to plan coordination of construction activities. Any difference or conflict arising between the CONTRACTOR and any other contractor employed by the OWNER shall be submitted to the CONSTRUCTION MANAGER for a decision in the matter. The CONTRACTOR shall comply with reasonable direction from the CONSTRUCTION MANAGER whose decision on coordination matters will be final.
7.5 Remedy For Delays By Others - By entering into this Agreement, the CONTRACTOR acknowledges there may be other contractors on the site whose work will be coordinated with that of his own. The CONTRACTOR expressly warrants and agrees he will cooperate with other contractors and will do nothing to delay, hinder, or interfere with the WORK of other separate contractors, the OWNER, the CONSTRUCTION MANAGER or DESIGN CONSULTANT.
The CONTRACTOR also expressly agrees, in the event the WORK is hindered, delayed, interfered with or otherwise at1ected by a separate contractor, his sole remedy will be a direct action against the separate contractor. The CONTRACTOR will have no remedy, and hereby expressly waives any remedy, against the OWNER and/or the CONSTRUCTION MANAGER
8.b
Packet Pg. 1475 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-31
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
or DESIGN CONSULTANT on account of delay, hindrance, interference or other event caused by a separate contractor, including any claim for a change in the Contract Time.
7.6 Out Of Sequence Or Accelerated Work - When WORK is performed out of sequence and ahead Interfacing Work, the CONTRACTOR shall be responsible for taking reasonable steps to minimize damage or loss to the WORK which may be caused by others during the performance of their work, including but not limited to furnishing prompt written notice to the CONSTRUCTION MANAGER and to the other contractors that WORK has been performed out of sequence and ahead Interfacing Work.
7.7 NATIONAL LABOR RELATIONS BOARD REQUIREMENTS - The
CONTRACTOR's Price shall include all costs associated with complying with National Labor Relations Board requirements for accessing the Project WORK site.
ARTICLE 8- OWNER'S RESPONSIBILITIES
8.1 GENERAL - The OWNER has the final authority in all matters affecting the WORK.
8.2 COMMUNICATIONS - In general, the OWNER and DESIGN CONSULTANT shall issue all written communications to the CONTRACTOR through the CONSTRUCTION MANAGER.
8.3 PAYMENTS - The OWNER shall make payments to the CONTRACTOR as provided in Article 14.
8.4 LANDS, EASEMENTS, AND SURVEYS - The OWNER's duties in respect of providing lands and easements and providing Engineering surveys to establish reference points are set forth in Article 4. The OWNER shall identify and make available to the CONTRACTOR copies of reports of explorations and tests of subsurface conditions at the site and in existing structures which have been utilized in preparing the Contract Documents as set forth in Article
4. 8.5 CHANGE ORDERS - The OWNER shall execute Change Orders as indicated in Article
10. 8.6 INSPECTIONS AND TESTS - The OWNER's responsibility with respect to inspections, tests, and approvals is set forth in Article 13.
8.7 SUSPENSION OF WORK - In connection with the OWNER's right to stop work or suspend work, see Articles 13 and 15.
8.8 TERMINATION OF AGREEMENT - Article 15 deals with the OWNER's right to terminate services of the CONTRACTOR.
8.9 OWNER'S RESPONSIBILITY FOR UNDISCLOSED HAZARDOUS MATERIALS The OWNER's responsibility with respect to undisclosed Asbestos, PCBs, Petroleum,
8.b
Packet Pg. 1476 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-32
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Hazardous Waste or Radioactive Materials uncovered or revealed at the site is set forth in Article
4. 8.10 NO OWNER SUPERVISION INTENDED - The OWNER or CONSTRUCTION MANAGER shall not supervise, direct or have control or authority over, nor be responsible for, the CONTRACTOR's means, methods. techniques, sequences or procedures of construction or the Safety precautions and programs incident thereto, or for any failure of the CONTRACTOR to comply with Laws and Regulations applicable to the furnishing or performance of the WORK. The OWNER and CONSTRUCTION MANAGER will not be responsible for the CONTRACTOR's failure to perform or furnish the WORK in accordance with the Contract Documents.
ARTICLE 9 -- CONSTRUCTION MANAGER'S STATUS DURING CONSTRUCTION
9.1 GENERAL
9.1.1 OWNER'S REPRESENTATIVE -The CONSTRUCTION MANAGER will be the OWNER's representative during the construction period. The duties and responsibilities and the limitations of authority of the CONSTRUCTION MANAGER as the CONSTRUCTION MANAGER during construction are set forth in the Contract Documents.
9.1.2 Contract Documents Terms - Whenever in the Contract Documents the terms "as ordered," "as directed," "as required," ·'as allowed,'' "as reviewed," "as approved,'' or terms of like effect or import are used. or the adjectives "reasonable," "suitable," "acceptable,'' "proper,'' or "satisfactory" or adjectives of like effect or import are used to describe a requirement, direction, review, or judgment of the CONSTRUCTION MANAGER as to the WORK, it is intended such requirement, direction, review, or judgment will be solely to evaluate the WORK for compliance with the requirements of the Contract Documents, and conformance with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents, unless there is a specific statement indicating otherwise. The use of any such term or adjective shall not be effective to assign to the CONSTRUCTION MANAGER any duty or authority to supervise or direct the performance of the WORK or any duty or authority to undertake responsibility contrary to the Article 9.
9.2 PRESENCE ON SITE - The CONSTRUCTION MANAGER will be on site during construction to observe the progress, quantity, and quality of the WORK and to determine, in general, if the WORK is proceeding in accordance with the Contract Documents. The CONSTRUCTION MANAGER will not supervise, direct, or have control over the CONTRACTOR's work.
9.3 CONTRACT DOCUMENT CLARIFICATIONS AND INTERPRETATIONS - The CONSTRUCTION MANAGER will issue with reasonable promptness such written clarifications or interpretations of the requirements of the Contract Documents (in the form of Drawings or otherwise) as the CONSTRUCTION MANAGER may determine necessary, which shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. Such written clarifications and interpretations will be binding on the OWNER and
8.b
Packet Pg. 1477 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-33
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR. If the CONTRACTOR believes that a written clarification or interpretation justifies an adjustment in the Contract Price or the Contract Time and the parties are unable to agree to the amount or extent the CONTRACTOR may request an adjustment in the Contract Price or an extension of the Contract Time therefore as provided in Articles 11 or 12.
9.4 AUTHORIZED VARIATIONS IN WORK - The CONSTRUCTION MANAGER may authorize minor variations in the WORK, (not resulting in changes to the Contract Price or Contract Time), which are consistent with the intent of the Contract Documents. These may be accomplished by a Construction Manager Order. 1f the CONTRACTOR believes that a Construction Manager Order justifies an increase in the Contract Price or an extension of the Contract Time, the CONTRACTOR may request an adjustment in the Contract Price or an extension of the Contract Time therefore as provided in Articles 11 or 12.
If the CONTRACTOR proceeds with the directed work without making such a request or providing notice he will be presumed to be in agreement with the CONSTRUCTION MANAGER's determination that no change in price or time are involved, and will be considered to have waived his right to request an adjustment in Contract Time or Price.
9.5 ACCEPTANCE OF WORK - The OWNER has the final authority in all matters affecting the WORK. Within the scope of the Agreement, the CONSTRUCTION MANAGER has the authority to enforce compliance with the Plans and Specifications. The CONTRACTOR shall promptly comply with instructions from the CONSTRUCTION MANAGER or any authorized representative. On all matters relating to quantities, the acceptability of material, equipment, or work, the execution, progress or sequence of work, and the interpretation of Specifications or Drawings. The decision of the CONSTRUCTION MANAGER shall be precedent to any payment under the Agreement, unless otherwise ordered by the OWNER.
The CONSTRUCTION MANAGER will recommend final acceptance to the OWNER.
9.6 REJECTING DEFECTIVE WORK - The CONSTRUCTION MANAGER will have authority to reject work which the CONSTRUCTION MANAGER determines to be defective, or not in compliance with the Contract Documents or that the DESIGN CONSULTANT or the CONSTRUCTION MANAGER believes will not produce a completed Project or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. The CONSTRUCTION MANAGER will also have authority to require special inspection or testing of the WORK as provided in Article 13, whether or not the WORK is fabricated, installed, or completed.
9.7 CONTRACTOR SUBMITTALS - In connection with the CONSTRUCTION MANAGER's responsibilities as to Submittals, see Section 01300 "Contractor Submittals."
9.8 CHANGE ORDER - In connection with the CONSTRUCTION MANAGER's responsibilities as to Change Orders, see Articles 10, 11, and 12.
9.9 PAYMENTS - In connection with CONSTRUCTION MANAGER's responsibility as to Applications for Payment, see Article 14.
8.b
Packet Pg. 1478 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-34
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
9.10 FINAL APPLICATION FOR PAYMENT - CONSTRUCTION MANAGER's review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds and certificates of inspection, tests and approvals and other documentation required to be delivered by Article 14 will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests and approvals that the results certified indicate compliance with the Contract Documents.
9.11 DECISIONS ON DISPUTES
9.11.1 Interpreter Of Contract Documents – To the extent allowed by law, the CONSTRUCTION MANAGER will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the WORK thereunder. Claims, disputes, and other matters relating to the acceptability of the WORK; the interpretation of the requirements of the Contract Documents pertaining to the performance of the WORK; and those claims with respect to changes in the Contract Price or Contract Time will be referred initially to the CONSTRUCTION MANAGER. The process to be followed is described in Article 16.
9.12 CONSTRUCTION MANAGER INTERPRETATION - When functioning as interpreter and judge under Article 9, the CONSTRUCTION MANAGER will not show partiality to the OWNER, the DESIGN CONSULTANT or the CONTRACTOR and will not be liable in connection with any interpretation or decision rendered in good faith in such capacity. The rendering of a decision by the CONSTRUCTION MANAGER pursuant to Article 9 will be a condition precedent to any exercise by the CONTRACTOR of such rights or remedies as he may otherwise have under the Contract Documents or by Laws and Regulations in respect of any such claim, dispute or other matter pursuant to A1iicle 16.
9.13 LIMITATION ON CONSTRUCTION MANAGER'S RESPONSIBILITIES
9.13.1 No Duty Arising Out Of Act Or Decision - Neither the CONSTRUCTION MANAGER's authority to act under this Article 9 or other provisions of the Contract Documents, nor any decision made by the CONSTRUCTION MANAGER in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility of the CONSTRUCTION MANAGER to the CONTRACTOR, any Subcontractor, any Supplier, any surety for any of them, or any other person or organization performing any of the WORK.
9.13.2 No Supervision Role - The CONSTRUCTION MANAGER will not supervise, direct, control, or have authority over, or be responsible for the CONTRACTOR's means, methods, techniques, sequences, or procedures of construction, or the Safety precautions and programs incident thereto, or for any failure of the CONTRACTOR to comply with Laws and Regulations, applicable to the performance of the WORK. The CONSTRUCTION MANAGER will not be responsible for the CONTRACTOR's failure to perform the WORK in accordance with the Contract Documents.
8.b
Packet Pg. 1479 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-35
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
9.13.3 CONTRACTOR Acts Or Omissions - The CONSTRUCTION MANAGER will not be responsible for the acts or omissions of the CONTRACTOR nor of any Subcontractor, Supplier or any other person or organization performing any of the WORK.
ARTICLE 10 -- CHANGES IN THE WORK
10.1 CHANGES REQUESTED BY THE CONTRACTOR
10.1.1 CONSTRUCTION MANAGER Approval - Changes in the Plans and Specifications, requested in writing by the CONTRACTOR, which do not materially affect the WORK and which are not detrimental to the WORK or to the interests of OWNER, may be granted to facilitate the WORK, when approved in writing by the CONSTRUCTION MANAGER. If the method will result in a cost saving, then an appropriate deductive change will be required.
10.1.2 Specified Methods - Changes in specified methods of construction may be made at the CONTRACTOR's request when approved in writing by the CONSTRUCTION MANAGER. If the method will result in a cost saving, then an appropriate deductive change will be required.
10.1.3 No Right To Change - Nothing herein shall be construed as granting a right to the CONTRACTOR to demand acceptance of such changes.
10.1.4 Request for Change Made in Good Faith - The Request For Change shall be made in good faith, and the amount requested accurately reflects the adjustments in Contract Price or Contract Time for which the CONTRACTOR believes the OWNER is liable, and covers all direct, supplemental, indirect, consequential, serial and cumulative costs and delays to which the CONTRACTOR is entitled as a result of the change.
10.2 OWNER'S RIGHT TO MODIFY WORK
10.2.1 Requirement To Implement Directed Change - Without invalidating the Agreement and without notice to any surety, the OWNER may at any time or from time to time, order additions, deletions, or revisions in the WORK; these will be authorized by a written Change Order prepared by the CONSTRUCTION MANAGER and issued by the OWNER. Upon receipt of any such document, the CONTRACTOR shall promptly proceed with the work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided).
10.2.2 Request For Proposal - When the OWNER desires a change in the WORK the CONSTRUCTION MANAGER will issue a Request for Proposal to the CONTRACTOR. The CONTRACTOR will be required to respond within the time indicated by the CONSTRUCTION MANAGER or fifteen ( 15) Days. whichever is less. If the CONTRACTOR fails to meet the submittal time required by this provision, the CONTRACTOR will he solely liable for any delays or impacts caused by the delayed submittal of the proposal.
10.3 REQUIREMENT TO PROCEED WITH WORK - lf the OWNER and the CONTRACTOR agree on the value of any work, and the amount of Contract Time that should
8.b
Packet Pg. 1480 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-36
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
be allowed as a result of the CONTRACTOR's response to a Request for Proposal, then the CONTRACTOR shall proceed as directed by the OWNER so as to minimize the impact on and delays to the work pending the issuance of a Change Order. If however, the OWNER and the CONTRACTOR are unable to agree as to the extent of an increase or decrease in the Contract Price or an extension or shortening of the Contract Time that should be allowed as a result of the CONTRACTOR's response to a Request for Proposal, then the OWNER can direct the CONTRACTOR to proceed on the basis of a price for the WORK as estimated by the CONSTRUCTION MANAGER or Time and Materials so as to minimize the impact on and delays to the work, in accordance with Article 11.
10.4 WORK NOT IN CONTRACT - The CONTRACTOR shall not be entitled to an increase in the Contract Price nor an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, supplemented by Change Order, or Field Order, except in the case of an emergency and except in the case of uncovering work as provided in Article 13.
10.5 CHANGE ORDER PROCESS - The OWNER and the CONTRACTOR shall execute appropriate Change Orders covering:
10.5.1 OWNER Ordered Changes - Changes m the WORK which are ordered by the OWNER pursuant to Article 10;
10.5.2 Changes Due To Defective Work - Changes required because of acceptance of Defective Work under Article 13; and
10.5.3 Mutually Agreed Price/Time Changes - Changes in the Contract Price or the Contract Time which are agreed to by the parties.
10.6 NOTICE TO SURETY - If notice of any change is required by the provisions of any Bond to be given to a surety, then the giving of any such notice will be the CONTRACTOR's responsibility, and the amount of each applicable Bond shall be adjusted accordingly.
10.7 ALLOWABLE QUANTITY VARIATIONS - In the event of an increase or decrease in Bid item quantity of a unit priced item in the Agreement, the total amount of work actually done or materials or equipment furnished shall be paid for according to the unit price established for such work under the Contract Documents, wherever such unit price has been established; provided, that an adjustment in the unit price may be made for changes which result in an increase or decrease in excess of the allowable percentage variations as set forth by the Contract Documents.
ARTICLE 11 -- CHANGE OF CONTRACT PRICE (Change Orders, Field Orders, and Work Orders)
11.1 CONTRACT PRICE CHANGE - The Contract Price may only be changed by a written Change Order.
8.b
Packet Pg. 1481 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-37
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
11.2 METHODS FOR DETERMINING ADJUSTMENTS IN CONTRACT PRICE
11.2.1 Methods - The methods to be used to determine an adjustment in Contract Price necessitated by changes ordered or negotiated pursuant to these General Conditions, or work covered by a Request for Proposal are limited to the following:
11.2.1.1 Where the work involved is covered by lump sum prices in the Contract Documents:
on the basis of a lump sum negotiation;
11.2.1.2 Where the work involved is covered or is of the same character as Unit Price Work:
by application of those unit prices to the quantities of the items involved (subject to the provisions covering Unit Price Work):
11.2.1.3 Where the work involved is not covered by either of the preceding methods:
by mutual acceptance of a lump sum price negotiated on the basis of the CONTRACTOR's itemized estimate of the anticipated Cost of the work involved, determined as specified in this Article, and a Contractor's Fee as provided in this Article;
11.2.1.4 Where the work involved is not covered by either of the first two methods, and the CONSTRUCTION MANAGER and the CONTRACTOR cannot achieve agreement on the anticipated cost of the work involved and the OWNER directs the CONTRACTOR to proceed with the work with payments to be made on the basis of the CONSTRUCTION MANAGER's determination of the cost of the work involved, and a CONTRACTOR's profit of eighty percent (80%) of the amount allowed for profit pursuant to section 11.2.2 of this Article:
11.2.1.5 Where the work involved is not covered by either of the first two methods, and the OWNER directs the CONTRACTOR to proceed with the work involved with payments to be made on the basis of actual costs: on the basis of the actual cost of the work involved, determined as specified in this Article, and the CONTRACTOR's profit determined as fifty percent (50%) of the amount allowed for profit pursuant to section 11.2.2 of this Article; and
11.2.1.6 Where the work involved is not covered by any of the preceding methods, and when payment is to be determined by a court of competent jurisdiction, it is agreed that the actual cost method used for actual cost basis work shall be an appropriate method for determining the cost of the work involved;
11.2.2 CONTRACTOR's Overhead and Profit Limitation - For all negotiated Change Orders the Allowance for overhead and profit shall include full compensation for superintendence, insurance premiums, taxes, field office expense, extended overhead, home office overhead, and all other items of expense or cost not included in the cost of labor, materials, or equipment provided for in this Article. The Allowance for overhead and profit will not exceed the following schedule:
Overhead Profit
Labor = ten percent (10%) ten percent (10%)
Materials= ten percent (10%) five percent (5%)
8.b
Packet Pg. 1482 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-38
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Equipment= ten percent (10%) five percent (5%)
To the sum of the costs and markups provided for in this Article, one percent (1%) shall be added as compensation for bonding.
11.2.3 Subcontractor Mark Up - It is understood labor, materials, and equipment may be furnished by the CONTRACTOR or by the Subcontractor on behalf of the CONTRACTOR.
When all or any part of the extra work is performed by a Subcontractor, the Allowance specified herein shall be applied to the labor, materials, and equipment costs of the Subcontractor, to which the CONTRACTOR may add five percent (5%) of the Subcontractor's total cost for the extra work. Regardless of the number of hierarchical tiers of Subcontractors, the five percent (5%) increase above the performing Subcontractor's total cost which includes the Allowances for overhead and profit may be applied one (1) time only.
11.2.4 Equipment Rental Rates
11.2.4.1 All equipment rental rates shall be in accordance with the rental rate source identified in the Supplementary General Conditions based on a monthly rate for the equipment, and based on an equipment utilization of one hundred seventy-three (173) hours per month. The CONTRACTOR will be permitted to charge only for the hours the equipment is actually used in the changed work.
11.2.4.2 Equipment Required Specifically for the Additional Work - Whenever possible, changed work will be accomplished using equipment available on-site or owned by the CONTRACTOR. If no on-site equipment can be used, and a specific piece of equipment must be rented to be used exclusively for the changed work, the rental rate will be the invoiced rate.
11.3 COST OF WORK (BASED ON TIME AND MATERIALS)
11.3.1 General - The term "cost of work" means the sum of all costs necessarily incurred and paid by the CONTRACTOR for labor, materials, and equipment in the proper performance of extra work. Except as otherwise may be agreed to in writing by the OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items, and shall not include any of the excluded costs itemized in this Article.
11.3.2 Labor - The costs of labor will be the actual cost substantiated by certified payroll for wages prevailing for each craft or type of workers performing the extra work at the time the extra work is done, plus employer payments of payroll taxes, workers compensation insurance, liability insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs resulting from Federal, State or local laws, as well as assessments or benefits required by lawful collective bargaining agreements. Labor costs for equipment operators and helpers shall be paid only when such costs are not included in the invoice for equipment rental. The labor costs for foremen shall be proportioned to all of their assigned work and only that applicable to extra work shall be paid. Nondirect labor costs including the superintendent,
8.b
Packet Pg. 1483 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-39
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Project manager, and other labor identified in 11.3.7.1 shall be considered part of the overhead markup identified in this Article.
11.3.3 Materials - The cost of materials reported shall be itemized at invoice or lowest current price at which materials are locally available and delivered to the job in the quantities involved, plus the cost of sales tax, freight, delivery and storage.
11.3.3.1 Trade discounts available to the purchaser shall be credited to the OWNER notwithstanding the fact that such discounts may not have been taken by the CONTRACTOR.
11.3.3.2 For materials secured by other than a direct purchase and direct billing to the purchaser, the cost shall be deemed to be the price paid to the actual Supplier as determined by the CONSTRUCTION MANAGER.
11.3.3.3 Payment for materials from sources owned wholly or in part by the purchaser shall not exceed the price paid by the purchaser for similar materials from said sources on extra work items or the current wholesale price for such materials delivered to the work site, whichever price is lower.
11.3.3.4 If in the opinion of the CONSTRUCTION MANAGER the cost of material is excessive, or the CONTRACTOR does not furnish satisfactory evidence of the cost of such material, then the cost shall be deemed to be the lowest current wholesale price for the total quantity concerned delivered to the work site less trade discount.
11.3.3.5 The OWNER reserves the right to furnish materials for the extra work and no claim shall be allowed by the CONTRACTOR for costs and profit on such materials.
11.3.4 Equipment - The CONTRACTOR will be paid for the use of equipment at the rental rate listed for such equipment specified in the Supplementary General Conditions. Such rental rate will be used to compute payments for equipment whether the equipment is under the CONTRACTOR's control through direct ownership, leasing, renting, or another method of acquisition. The rental rate to be applied for use of each item of equipment shall be the rate resulting in the least total cost to the OWNER for the total period of use. If it is deemed necessary by the CONTRACTOR to use equipment not listed in the publication specified in the Supplementary General Conditions, then an equitable rental rate for the equipment will be established by the CONSTRUCTION MANAGER. The CONTRACTOR may furnish cost data which might assist the CONSTRUCTION MANAGER in the establishment of the rental rate.
11.3.4.1 All equipment shall, in the opinion of the CONSTRUCTION MANAGER, be in good working condition and suitable for the purpose for which the equipment is to be used.
11.3.4.2 Before construction equipment is used on the extra work, the CONTRACTOR shall plainly stencil or stamp an identifying number thereon at a conspicuous location, and shall furnish to the CONSTRUCTION MANAGER, in duplicate, a description of the equipment and its identifying number and the scheduled work activities planned.
8.b
Packet Pg. 1484 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-40
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
11.3.4.3 Unless otherwise specified, manufacturer's ratings and manufacturer approved modifications shall be used to classify equipment for the determination of applicable rental rates.
Equipment which has no direct power unit shall be powered by a unit of at least the minimum rating recommended by the manufacturer.
11.3.5 Rental Equipment
11.3.5.1 The rental time to be paid for equipment on the work site shall be the time the equipment is in productive operation on the extra work being performed and, in addition, shall include the time required to move the equipment to the location of the extra work and return it to the original location or to another location requiring no more time than that required to return it to its original location; except, that moving time will not be paid if the equipment is used on other than the extra work, even though located at the site of the extra work.
11.3.5.2 Rental time will not be allowed while equipment is inoperative due to breakdowns.
11.3.5.3 Computation Method - The following shall be used in computing the rental time of equipment on the work site.
11.3.5.3.1 When hourly rates are listed, any part of an hour less than thirty (30) minutes of operation shall be considered to be one-half (.5) hour of operation, and any part of an hour in excess of thirty (30) minutes will be considered one (1) hour of operation.
11.3.5.3.2 When daily rates are listed, any part of a Day less than four (4) hours operation shall be considered to be one-half (.5) Day of operation.
11.3.6 Contractor - Owned Equipment- For CONTRACTOR-owned equipment, the allowed equipment rental rate will be limited to the monthly equipment rental rate using a utilization rate of one hundred seventy-three ( 173) hours per month which is found in the Equipment Rental Rate Tables authorized by the Supplementary General Conditions for rental equipment.
11.3.7 Special Services - Special work or services are defined as that work characterized by extraordinary complexity, sophistication, or innovation or a combination of the foregoing attributes which are unique to the construction industry.
11.3.7.1 When the CONSTRUCTION MANAGER and the CONTRACTOR determine that a special service is required which cannot be performed by the forces of the CONTRACTOR or those of any of its Subcontractors, the special service may be performed by an entity especially skilled in the work. Invoices for special services based upon the current fair market value thereof may be accepted without complete itemization of labor, material, and equipment rental costs, after validation of market values by the CONSTRUCTION MANAGER.
11.3.7.2 All invoices for special services will be adjusted by deducting all trade discounts offered or available, whether the discounts were taken or not. In lieu of the Allowances
8.b
Packet Pg. 1485 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-41
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
for overhead and profit specified in this Article, herein, an Allowance of fifteen percent (15%) will be added to invoices for special services.
11.3.8 Excluded Costs - The term "cost of the work" shall not include any of the following costs:
11.3.8.1 Overhead Cost - Payroll costs and other compensation of the CONTRACTOR's officers, executives, principals (of partnership and sole proprietorships) general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, timekeepers, clerks and other personnel employed by the CONTRACTOR whether at the site or in the CONTRACTOR's principal office, a branch office or material yard and shop for general administration of the Work or not specifically covered by this Article all of which are to be considered administrative costs covered by the CONTRACTOR's Allowance for overhead and profit.
11.3.8.2 Office Expense - Expenses of the CONTRACTOR's principal and branch offices.
11.3.8.3 Capital Expenses - Any part of the CONTRACTOR's capital expenses, including interest on the CONTRACTOR's capital employed for the WORK and charges against the CONTRACTOR for delinquent payments.
11.3.8.4 Premiums - Cost of premiums for all Bonds and for all insurance whether or not CONTRACTOR is required by the Contract Documents to purchase and maintain the same.
11.3.8.5 Negligence - Costs due to the negligence of the CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of Defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property.
11.3.8.6 Other - Other overhead or general expense costs of any kind and the cost of any item not specifically and expressly included in this Article.
11.3.8.7 Small Tools - Cost of small tools valued at less than five hundred dollars ($500) and that remain the property of the CONTRACTOR.
11.3.8.8 Administrative Costs - Costs associated with the preparation of Change Orders (whether or not ultimately authorized), cost estimates, or the preparation or filing of claims.
11.3.8.9 Anticipated Lost Profits - Expenses of the CONTRACTOR associated with anticipated lost profits or lost revenues, lost income or earnings, lost interest on earnings or unpaid retainage.
11.3.8.10 Home Office Overhead - Costs derived from the computation of a ''home office overhead'' rate by application of the Eichleay, Allegheny, Burden Fluctuation, or other similar methods.
8.b
Packet Pg. 1486 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-42
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
11.3.8.11 Special Consultants and Attorneys - Costs of special consultants or attorneys, whether or not in the direct employ of the CONTRACTOR, employed for services specifically related to the resolution of a claim, dispute, or other matter relating to the acceptability of the Work.
11.3.9 CONTRACTOR's Extra Work Report - In order to be paid for extra work based on time and materials, the CONTRACTOR must submit a daily Extra Work Report on a form provided by the CONSTRUCTION MANAGER. The form must be completely filled out based on the provisions of this Article and signed by the CONTRACTOR and the CONSTRUCTION MANAGER at the end of each working Day. Failure to complete the form and obtain appropriate signatures by the next working Day after the work was completed will result in the CONTRACTOR's costs for extra work being disallowed until such form is completed and agreed to by the CONSTRUCTION MANAGER. Delay in submitting the form beyond seven (7) Days will result in the Construction MANAGER's records becoming the official record for payment purposes.
11.4 COSTS RELATING TO WEATHER DAMAGE
The CONTRACTOR shall have no cost claims against the OWNER for damages for any injury to work, materials, or equipment resulting from the action of the elements or weather. Weather related adjustment to Contract Time will be made in accordance with Article 12.
11.5 WRITTEN JUSTIFICATION SUBSTANTIATING ADJUSTMENT
11.5.1 CONTRACTOR -Initiated Change- Any request by the CONTRACTOR for a change in the Contract Price shall be based on written notice delivered by the CONTRACTOR to the CONSTRUCTION MANAGER promptly (but in no event later than seven (7) Days) after the start of the occurrence or the event giving rise to the request for adjustment and stating the general nature of the request.
11.5.2 Cost and Time Notice Requirements - Notice of the amount of the request for adjustment in cost and/or time with supporting data shall be delivered within fourteen (14) Days after such start of occurrence, unless the CONSTRUCTION MANAGER allows an additional period of time to ascertain more accurate data in support of the request.
11.5.3 Proposal Form -The CONTRACTOR's proposal shall be on forms acceptable to the CONSTRUCTION MANAGER. The CONTRACTOR proposal request shall certify in writing that the amounts included cover all direct, supplemental, indirect, consequential and cumulative costs and delays, as applicable, and that those costs and delays would be or were necessarily incurred, despite the CONTRACTOR's reasonable and diligent efforts to mitigate them.
Mitigation efforts undertaken by the CONTRACTOR should be described.
11.5.4 Proposal Content - Where the change in Contract Price is to be determined on the basis of the "cost of the work involved,'' the CONTRACTOR's itemized estimates shall detail all applicable elements of cost, including, but not limited to, labor man-hours and payroll costs,
8.b
Packet Pg. 1487 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-43
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
quantities, crew mixes, production rates, material costs, Subcontractor and Supplier costs, equipment costs, and supplemental costs. Where the change in Contract Price arises from changes in the schedule of all or part of the WORK, or where a change in Contract Time is sought, the submittal shall include analysis required by Article 12. With respect to work during other than normal hours, the labor charges associated with such work shall consist of straight time wages and burden plus the appropriate overtime or shift premium with no additional burden (i.e., fringe benefits) on the premium portion.
11.5.5 Additions and Deletions -The submittal shall cover all aspects of the work involved, whether relating to deleted, added, revised, or impacted items of Work. Amounts for Subcontractors or Suppliers at any tier shall be similarly supported.
11.5.6 Requirements for Valid Proposal - No submittal for an adjustment in Contract Price or Contract Time shall be valid unless submitted in accordance with this Article.
11.5.7 Obligation of Surety - All work performed hereunder shall be subject to all of the provisions of the Contract Documents and the CONTRACTOR's sureties shall be bound with reference thereto as under the original Agreement. Copies of all amendments to surety Bonds or supplemental surety Bonds shall be submitted to the OWNER when requested.
11.5.8 Documentation - The CONTRACTOR is required to comply with the CONSTRUCTION MANAGER's documentation requirements regarding format and level of detail for the Change Order process.
11.6 OWNER RIGHT TO DIRECT USE OF CONIPETITIVE BID - The OWNER reserves the right to direct the CONTRACTOR to solicit competitive bids for additional work. If required by the OWNER, the CONTRACTOR shall obtain competitive bids from Subcontractors acceptable to the CONTRACTOR and shall deliver such bids to the OWNER who will then determine, with the advice of the CONSTRUCTION MANAGER, which bids will be accepted.
11.7 NO COMPENSATION FOR DELAY DURING CONTRACT TIME. The CONTRACTOR shall not be entitled to any compensation or any compensatory or other damages if, for any reason whatsoever during the Contract Time, the WORK progresses at a pace slower than anticipated by the CONTRACTOR.
ARTICLE 12 -- CHANGE OF CONTRACT TIME
12.1 GENERAL
12.1.1 CONTRACTOR Request For Time Extension - The Contract Time may only be changed by a Change Order or Field Order. Any request by the CONTRACTOR for an extension of the Contract Time (or Milestones) shall be based on written notice delivered by the CONTRACTOR to the CONSTRUCTION MANAGER promptly (but in no event later than seven (7) Days) after the occurrence of the event giving rise to the request and stating the general nature of the request, unless otherwise noted. Notice of the extent of the request with supporting data shall be delivered within fourteen (14) Days after such occurrence (unless
8.b
Packet Pg. 1488 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-44
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
the CONSTRUCTION MANAGER allows an additional period of time to ascertain more accurate data in support of the request) and shall be accompanied by the CONTRACTOR's written statement that the adjustment requested is the entire time adjustment to which the CONTRACTOR has reason to believe it is entitled as a result of the occurrence of said event.
An increase in Contract Time does not mean that the CONTRACTOR is due an increase in Contract Price.
12.1.2 CONTRACTOR Required Analysis - An extension in Contract Time will not be granted unless the CONTRACTOR can demonstrate through an analysis of the Critical Path Method Progress Schedule critical path that the increases in the time to perform or complete the WORK, or specified part of the WORK, beyond the corresponding Contract Time arise from unforeseeable causes beyond the control and without the fault or negligence of both the CONTRACTOR and his Subcontractors, Suppliers or other persons or organizations, and that such causes in fact lead to performance or completion of the WORK, or specified part in question, beyond the corresponding Contract Time, despite the CONTRACTOR's reasonable and diligent actions to guard against those effects.
12.1.3 OWNER's Right To Grant Time Extension - The OWNER may elect, at its sole discretion, to grant an extension in Contract Time, without the CONTRACTOR's request, because of delays or other factors.
12.2 TIME IS OF THE ESSENCE - With regard to all Contract Milestones and all time limits stated in the Contract Documents, "time is of the essence."
12.3 CRITERIA FOR DETERMINING ADJUSTMENTS IN CONTRACT TIME
12.3.1 Use Of Float and Critical Path - Use of float is in accordance with the General Requirements.
12.3.2 Types Of Delays Beyond the CONTRACTOR's and the OWNER's Control - Delays beyond the control of the CONTRACTOR shall include, but not be limited to, acts or neglect by the OWNER, acts or neglect of utility owners, fires, floods, epidemics, abnormal weather conditions, labor slowdowns and strikes, or acts of God. The CONTRACTOR must provide the CONSTRUCTION MANAGER written notice of the potential delay within twentyfour (24) hours of the occurrence.
12.3.3 Subcontractor Delays Within the CONTRACTOR's Control - Delays attributable to and within the control of Subcontractor or Supplier shall be deemed to be delays within the control of the CONTRACTOR. No time extension will be allowed for such delays.
12.4 TIME ONLY ENTITLEMENT
12.4.1 Where the CONTRACTOR is prevented from completing any part of the Work within the Contract Time (or Milestones) due to delay to a "critical path" activity beyond the control of both the OWNER and the CONTRACTOR an extension of the Contract Time (or Milestones)
8.b
Packet Pg. 1489 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-45
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
in an amount equal to the time lost on the critical path of the Project due to such delay shall be CONTRACTOR's sole and exclusive remedy for such delay.
12.4.2 In no event shall the OWNER be liable to the CONTRACTOR, any Subcontractor, any Supplier, or any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out or resulting from (i) delays caused by or within the control of the CONTRACTOR, or (ii) delays beyond the control of both parties including but not limited to fires, floods, epidemics, abnormal weather conditions, acts of God or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7. The CONTRACTOR must provide the CONSTRUCTION MANAGER written notice of the potential delay within twenty-four (24) hours of the occurrence.
12.5 EXTENSIONS OF TIME FOR DELAY DUE TO WEATHER - An inclement weather delay is defined as a delay caused by inclement weather which prevents the CONTRACTOR from working on the controlling item in the CONTRACTOR's construction schedule. Should the CONTRACTOR experience inclement weather delays over the course of contract duration in excess of the number of Days outlined in the Supplementary General Conditions, the CONTRACTOR shall be granted a time extension in accordance with the provisions outlined in this Article. The time extension shall be based on the number of inclement weather Days in excess of the number of Days outlined in the Supplementary General Conditions.
12.5.1 Extension of Time For Delays due to Weather Damage - If, however, in the opinion of the CONSTRUCTION MANAGER, the CONTRACTOR has made all reasonable efforts to protect the materials, equipment, and work, the CONTRACTOR may be granted a reasonable extension of Contract Time to make proper repairs, renewals, and replacements of the work, materials, or equipment in accordance with Article 12.
ARTICLE 13 - TEST AND INSPECTIONS; CORRECTION, REMOVAL, OR ACCEPTANCE OF DEFECTIVE WORK; WARRANTY AND GUARNTEE
13.1 TESTS AND INSPECTIONS
13.1.1 ACCESS TO WORK FOR TESTING AND INSPECTION - The OWNER, CONSTRUCTION MANAGER their Consultants, Sub-Consultants, other representatives and personnel of the OWNER, independent testing laboratories and governmental agencies with jurisdictional interests will have access to the WORK at reasonable times for their observation, inspecting and testing. The CONTRACTOR shall provide them proper and safe conditions for such access and advise them of the CONTRACTOR's Safety procedures and programs so that they may comply.
13.1.2 Cost of Inspection/Notice - The CONSTRUCTION MANAGER will make, or have made, such inspections and tests as the CONSTRUCTION MANAGER deems necessary to see that the WORK is being accomplished in accordance with the requirements of the Contract Documents. Unless otherwise specified, the cost of such inspection and testing will be borne by the OWNER. In the event such inspections or tests reveal non-compliance with the
8.b
Packet Pg. 1490 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-46
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
requirements of the Contract Documents, the CONTRACTOR shall bear the cost of corrective measures deemed necessary by the CONSTRUCTION MANAGER. as well as the cost of subsequent re inspection and re-testing. Neither observations by the CONSTRUCTION MANAGER nor inspections, tests. or approvals by others shall relieve the CONTRACTOR from the CONTRACTOR's obligation to perform the WORK in accordance with the Contract Documents. The CONTRACTOR shall give the CONSTRUCTION MANAGER timely notice as specified in the Technical Specification or five (5) Days if not identified of readiness of the WORK for all required on and off-site inspections, tests, or approvals, and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. The CONSTRUCTION MANAGER shall provide for the services of an independent testing laboratory to perform inspections, tests, or approvals required by the Contract Documents except as otherwise specifically provided. The CONTRACTOR shall be responsible for arranging any inspection required by a public entity. The CONTRACTOR shall provide adequate notice to the public entity and to the CONSTRUCTION MANAGER for any required inspection.
13.1.3 Right to Stop Work - The CONSTRUCTION MANAGER has the right to stop or suspend work activities which will cover the CONTRACTOR's work product which is to be inspected or tested, or which will interfere with the inspection or testing activities, for a reasonable time and the CONTRACTOR will have no right to additional cost or time he may incur as a result of the work stoppage.
13.2 CONTRACTOR INSPECTION AND TESTING RESPONSIBILITY
13.2.1 The CONTRACTOR shall be responsible for performance of tests and inspections in accordance with the Technical Specifications.
13.2.2 If Laws and Regulations of any public body having jurisdiction other than the OWNER require any work to specifically be inspected, tested, or approved, then the CONTRACTOR shall pay all costs.
13.2.3 The CONTRACTOR shall be responsible for and shall pay all costs in connection with any inspection or testing required in connection with the OWNER's or the CONSTRUCTION MANAGER's acceptance of a Supplier of materials or equipment proposed as a substitution or "or equal'' to be incorporated in the WORK, or of materials or equipment submitted for review prior to the CONTRACTOR's purchase thereof or incorporation in the WORK.
13.2.4 The CONTRACTOR shall: pay all related costs; schedule related activities at appropriate times; and secure and furnish for the CONSTRUCTION MANAGER the required certificates of inspection, testing or approval. Any associated cost and time required by the CONTRACTOR for inspections required under section 13.2 shall be considered as having Been included in the Contract Price and in the CONTRACTOR's schedule for the performance of the WORK within the Contract Time.
8.b
Packet Pg. 1491 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-47
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
13.2.5 All inspections, tests, or approvals other than those required by Laws and Regulations of any public body having jurisdiction shall be performed by organizations acceptable to the CONSTRUCTION MANAGER.
13.3 COVERING WORK TO BE INSPECTED
13.3.1 Covered Work Prior To Inspection Or Testing - If any work (including the work of others) that is to be inspected, tested, or approved is covered without written concurrence of the CONSTRUCTION MANAGER. then it must, when requested by the CONSTRUCTION MANAGER, be uncovered for inspection. The CONTRACTOR shall bear all direct, indirect, and consequential costs and damages of such uncovering, unless the CONTRACTOR has given the CONSTRUCTION MANAGER and/or agencies timely notice of the CONTRACTOR's intention to cover the same, and the CONSTRUCTION MANAGER has not acted with reasonable promptness in response to such notice.
13.3.2 Covered Work Contrary To Written Request - If any work is covered contrary to the written request of the CONSTRUCTION MANAGER, then it must, when requested by the CONSTRUCTION MANAGER, be uncovered for the CONSTRUCTION MANAGER's observation and recovered. The CONTRACTOR shall bear all direct, indirect, and consequential costs and damages of such uncovering.
13.3.3 CONSTRUCTION MANAGER Right To Direct That Work Be Uncovered For Inspection Or Testing
13.3.3.1 If the CONSTRUCTION MANAGER considers it necessary or advisable that covered work be observed by the CONSTRUCTION MANAGER or inspected or tested by others, then the CONTRACTOR, at the CONSTRUCTION MANAGER's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as the CONSTRUCTION MANAGER may require, that portion of the WORK in question, furnishing all necessary labor, material, and equipment.
13.3.3.2 If it is found that such work is defective, then the CONTRACTOR shall bear all direct, indirect, and consequential costs and damages of such uncovering, exposure, observation, inspection, and testing and of satisfactory reconstruction, including but not limited to fees and charges of Engineer, architects, attorneys, and other professionals. However, if such work is not found to be defective, then the CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering. exposure, observation, inspection, testing, and reconstruction; based on the time and materials provisions as outlined in Article 11.
13.4 OWNER MAY STOP THE WORK - If the work is determined to be defective by the CONSTRUCTION MANAGER, and the CONTRACTOR fails to immediately correct the defect or the CONTRACTOR fails to perform work in such a way that the completed work will conform to the Contract Documents, then the CONSTRUCTION MANAGER may order the CONTRACTOR to stop the WORK, or any portion thereof, until the cause for such order has been eliminated; however, this right of the CONSTRUCTION MANAGER to stop the WORK
8.b
Packet Pg. 1492 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-48
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
shall not give rise to any duty on the part of the OWNER or CONSTRUCTION MANAGER to exercise this right for the benefit of the CONTRACTOR or any other party. The CONTRACTOR shall bear all direct, indirect, and consequential costs and damages that result from this stop work notice.
13.5 CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK
13.5.1 CONTRACTOR's Responsibility - If required by the CONSTRUCTION MANAGER, then the CONTRACTOR shall promptly, either correct all Defective Work, whether or not fabricated, installed, or completed, or, if the WORK has been rejected by the CONSTRUCTION MANAGER, remove it from the site and replace it with non-defective work. The CONTRACTOR shall bear all direct, indirect and consequential costs and damages of such correction or removal.
13.5.2 OWNER Acceptance of Defective Work - If, instead of requiring correction or removal and replacement of Defective Work, the OWNER prefers to accept the work, then the OWNER may do so. The CONTRACTOR shall bear all direct, indirect, and consequential costs attributable to the OWNER's evaluation of and determination to accept such Defective Work. If any such acceptance occurs prior to Final Payment, then a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the WORK, and the OWNER shall be entitled to an appropriate decrease in the Contract Price, determined by the CONSTRUCTION MANAGER and charged to the CONTRACTOR through a deductive Change Order.
13.5.3 OWNER May Correct Defective Work
13.5.3.1 If the CONTRACTOR after receiving written notice, from the CONSTRUCTION MANAGER or from the OWNER, or both, fails within a reasonable time as specified in the notice, to correct Defective Work or to remove and replace rejected WORK, then the OWNER may correct and remedy any such deficiency. If the CONTRACTOR after receiving written notice, from the CONSTRUCTION MANAGER, or from the OWNER, or both, fails within reasonable time as specified in the notice, to perform the WORK in accordance with the Contract Documents, or fails to comply with any other provision of the Contract Documents, then the OWNER may correct and remedy any such deficiency.
13.5.3.2 In exercising the rights and remedies under this paragraph the OWNER shall proceed expeditiously.
13.5.3.3 The connection with such corrective and remedial action, the OWNER may exclude the CONTRACTOR from all or part of the site, take possession of all or part of the WORK, and suspend the CONTRACTOR's services related thereto, take possession of the CONTRACTOR's tools, appliances, construction equipment and machinery at the site and incorporate in the Work all materials and equipment stored at the site or for which the OWNER has paid the CONTRACTOR but which are stored elsewhere.
8.b
Packet Pg. 1493 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-49
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
13.5.3.4 The CONTRACTOR shall allow the OWNER. Engineers, Agents and employees, the OWNER's other contractors and the CONSTRUCTION MANAGER and the DESIGN CONSULTANT access to the site to enable the 0WNER to exercise the rights and remedies under this paragraph.
13.5.3.5 All claims, costs, losses and damages incurred or sustained by the OWNER in exercising such rights and remedies will be charged against the CONTRACTOR and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the WORK: and the OWNER shall be entitled to an appropriate decrease in the Contract Price, and, if the parties are unable to agree as to the amount thereof, the OWNER may unilaterally issue the Change Order through the CONSTRUCTION MANAGER.
13.5.3.6 Such claims, costs, losses and damages will include but not be limited to all costs of repair or replacement of work of others destroyed or damaged by correction, removal or replacement of the CONTRACTOR's Defective Work.
13.5.3.7 The CONTRACTOR shall not be allowed an extension of the Contract Time (or Milestones) because of any delay in the performance of the WORK attributable to the exercise by the OWNER of the OWNER's rights and remedies hereunder.
13.6 WARRANTY AND GUARANTEE
13.6.1 General - The CONTRACTOR warrants and guarantees to the OWNER that all work will be in accordance with the Contract Documents and will not be defective. Prompt notice of defects known to the OWNER or CONSTRUCTION MANAGER shall be given to the CONTRACTOR. All Defective Work, whether or not in place, may be rejected, corrected, or accepted as provided in this Article 13. Defective Work may be rejected even if approved by prior inspection.
13.6.2 One (1) Year Warranty Period - The Warranty Period shall commence when the Notice of Completion is issued, at Notice of Beneficial Occupancy, or at Notice of Partial Utilization of the work to be warranted has been issued, or a later date if so specified in the Agreement, or mutually agreed to, and extend until one (1) year after that date or whatever longer period may be prescribed by Laws and Regulations or by the terms of any applicable special guarantee or specific provision of the Contract Documents.
13.6.3 Correction of Defective Work - If within the designated Warranty Period, or such longer period as may be required by Laws and Regulations. the WORK, or any part of the WORK, is discovered to be defective, then the CONTRACTOR shall promptly, without an adjustment in Contract Price and in accordance with the OWNER's or the CONSTRUCTION MANAGER's written instructions, either correct that Defective Work, or if it has been rejected by the OWNER or the CONSTRUCTION MANAGER, remove it from the site and replace it with non-defective work. If circumstances warrant it, including but not limited to, in an emergency, then the OWNER or CONSTRUCTION MANAGER may have the Defective
8.b
Packet Pg. 1494 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-50
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Work corrected or the rejected work removed and replaced. In that event, the CONTRACTOR shall not be allowed to recover any associated costs, and he shall reimburse the OWNER for all direct indirect and consequential costs of the OW1\IER, and the OWNER shall be entitled to an appropriate decrease in Contract Price, to withhold a set-off against amount recommended for payment, or make a claim on the CONTRACTOR's bond if the CONTRACTOR has been paid in full. Where Defective Work (and damage to other Work resulting therefrom) has been corrected, removed or replaced during the one (l) year Warranty Period with respect to such Work will be extended for an additional period of one ( l) year after such correction or removal and replacement has been satisfactorily completed.
13.6.4 Early Completion - The one (l) year Warranty Period will not begin until the Notice of Completion is tiled. If the CONTRACTOR completes the WORK or portions thereof prior to this time, then the CONTRACTOR shall preserve the equipment and facilities by developing and implementing a preventive maintenance program in compliance with manufacturer's recommendations to maintain the equipment and/or facilities unless the OWNER has issued a Notice of Beneficial Occupancy or Notice of Partial Utilization for the warranted work. At start up, the CONTRACTOR will be required to get his equipment and/or facilities ready to put into service.
13.7 EXTENDED WARRANTIES AND GUARANTEES - The OWNER may at its sole discretion extend the one (1) year Warranty Period up to twenty-four (24) additional months, in which case the CONTRACTOR shall maintain the warranties and guarantees. If such extension of the one (1) year Warranty Period causes an increase in the cost of the warranties and guarantees provided by the CONTRACTOR, then an adjustment in Contract Price shall be made as provided by the Contract Documents.
ARTICLE 14 --PAYMENTS TO CONTRACTOR AND COMPLETION
14.1 BASIS FOR PAYMENT
14.1.1 Lump Sum Items
14.1.1.1 General - Items for which quantities are indicated as "Lump Sum" shall be paid for at the price indicated in the Bid. Such payment shall be full compensation for the items of work and all work appurtenant thereto.
14.1.1.2 Critical Path Method Schedule Used For Payment - Payment for all lump sum costs and services shall be based on the value of work accomplished. The allocation of cost to CPM schedule activities will be utilized for payment computation.
14.1.1.3 Critical Path Method Schedule Required - The CONTRACTOR shall submit to the CONSTRUCTION MANAGER a detailed cost loaded and manpower loaded CPM schedule, to be used as a basis for determining progress payments in accordance with the General Requirements.
14.1.2 Unit Priced Items
8.b
Packet Pg. 1495 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-51
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
14.1.2.1 General - Unit price items will be paid for based on equivalent quantities installed or performed. Unless otherwise specified, quantities of work shall be determined from measurements or dimensions in horizontal planes. However, linear quantities of pipe, piling, fencing, and timber shall be considered as being the true length measured along the longitudinal axis. Unless otherwise provided in the Specifications, volumetric quantities shall be the product of the mean area of vertical or horizontal sections and the intervening horizontal or vertical dimension. The CONTRACTOR and CONSTRUCTION MANAGER will agree on the unit quantity to be used for payment prior to its installation or removal when possible, or immediately after installation.
14.1.2.2 Methods of Measurement - Materials and items of work which are to be paid for on the basis of measurement shall be measured in accordance with the methods set forth in the particular sections involved.
14.1.2.3 Certified Weight - When payment is to be made on the basis of weight, the weighing shall be done on ce1iified platform scales or, when approved by the CONSTRUCTION MANAGER, on a completely automated weighing and recording system. The CONTRACTOR shall furnish the CONSTRUCTION MANAGER with duplicate licensed weighmaster's certificates showing the actual net weights.
14.1.2.4 Units of Measurement - Measurements shall be in accordance with U.S. Standard Measures. A pound is an avoirdupois pound. A ton is 2,000 pounds avoirdupois. The unit of liquid measure is the U.S. gallon.
14.2 PAYMENT
14.2.1 Wasted Or Rejected Material - Payment will not be made for materials wasted or disposed of in a manner not called for in the Contract Documents. This includes rejected material not unloaded from vehicles, material rejected after it has been placed and material placed outside of the Plan lines. No compensation will be allowed for disposing of rejected or excess materials.
14.2.2 CONTRACTOR Retains Ownership - Payment shall not relieve the CONTRACTOR from its obligations under the Agreement: nor shall such payment be construed to be acceptance of any of the WORK. Payment shall not be construed as the transfer of ownership of any equipment or materials to the 0\VNER. Prior to final acceptance of the WORK, responsibility of ownership shall remain with the CONTRACTOR who shall be obligated to store, protect, repair, replace, rebuild or otherwise restore any fully or partially completed work or structure for which payment has been made; or replace any materials or equipment required to be provided under the Agreement which may be damaged, lost, stolen or otherwise degraded in any way.
14.2.3 Payment Does Not Affect Warranty - Guarantee and warranty periods shall not be affected by any payment but shall commence as specified in Article 13.6.2.
8.b
Packet Pg. 1496 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-52
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
14.2.4 Stop Notice - within the time fixed by law, a properly executed notice to stop payment is filed with the OWNER due to the CONTRACTOR's failure to pay for labor or materials used in the WORK. then all money due for such labor or materials will be withheld from payment to the CONTRACTOR in accordance with applicable laws.
14.3 APPLICATION FOR PROGRESS PAYMENT
14.3.1 Payment Due Date - The CONTRACTOR shall, on the payment application date designated by the CONSTRUCTION MANAGER, submit to the CONSTRUCTION MANAGER for review, an Application for Payment tilled out and signed by the CONTRACTOR covering the WORK completed as of the date of the application and accompanied by such supporting documentation as is required by the General Requirements.
14.3.2 Payment Application Content - The Application for Progress Payment shall identify, as a subtotal, the amount of the CONTRACTOR's Total Earnings to Date. plus the Value of Materials stored at the Site which have not yet been incorporated in the WORK and less a deductive adjustment for materials previously paid. Payment for such material shall not be construed as acceptance of the material.
14.3.3 Net Payment - The net payment due the CONTRACTOR shall be the above-mentioned subtotal from which shall be deducted retainage and the total amount of all previous payments made to the CONTRACTOR.
14.3.4 Retention - A retention often percent (10%) of each approved progress payment will be withheld until the work is fifty percent (50%) complete; then the OWNER may, at its option, refund that portion of retainage held by the 0WNER that is in excess of five percent (5%) of the total of the WORK done to date and thereafter continue to retain five percent (5%) of the value of all approved progress payment requests subsequently submitted. When the Notice of Completion is issued, the OWNER at its option, may refund any portion of the remaining retention.
14.3.5 Retainage From Payments - The CONTRACTOR may elect to receive one hundred percent ( 100%) of payments due under the Contract Documents from time to time, without retention of any pot1ion of the payment by the OWNER, by depositing securities of equivalent value with the OWNER in accordance with the provisions of Public Contract Code §22300.
Such securities, if deposited by the CONTRACTOR, shall be valued by the OWNER, whose decision on valuation of the securities shall be final. Securities eligible for investment under this provision shall be limited to those listed in Government Code §16430, bank or savings and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the CONTRACTOR and the OWNER. This provision shall 1only become effective upon the OWNER's AND CONTRACTOR's execution of a separate agreement establishing the specifics for substituting securities.
14.3.6 Reinstating Retention - The OWNER may reinstate up to ten percent (10%) retention of the total of the WORK done if the OWNER determines, at its discretion, the CONTRACTOR is not performing the WORK satisfactorily or there is other specific cause for such withholding.
8.b
Packet Pg. 1497 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-53
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
14.3.7 Products Stored On - and Off-Site- Storage and payment for material supplies and/or equipment which will be incorporated into the WORK shall be in accordance with the provisions of the General Requirements.
14.4 CONTRACTOR'S WARRANTY OF TITLE - The CONTRACTOR warrants and guarantees title to all work, materials, and equipment covered by an Application for Payment, whether incorporated in the WORK or not, will pass to the OWNER at the time of Final Payment free and clear of all liens.
14.5 APPLICATIONS FOR PROGRESS PAYMENT - Thirty (30) Days after presentation of undisputed and properly submitted Application for Payment, the amount will become due and when due will be paid by the OWNER to the CONTRACTOR.
Any payment request that is disputed or determined to be improper shall be returned to the CONTRACTOR not later than seven (7) Days after receipt accompanied by documentation describing the reason(s) why the payment request is not proper.
Any progress payment not made within thirty (30) Days after an undisputed and properly submitted payment request will require the OWNER to pay interest as provided by Public Contract Code §20104.50.
14.6 REJECT PAYMENT FOR DEFECTIVE WORK - The CONSTRUCTION MANAGER may also refuse to recommend any such payment, or, because of subsequently discovered evidence or the results of subsequent inspections or tests, nullify any such payment previously recommended, to such extent as may be necessary in the CONSTRUCTION MANAGER's opinion to protect the OWNER from loss because:
14.6.1 The WORK is defective, or completed Work has been damaged requiring correction or replacement;
14.6.2 The Contract Price has been reduced by written amendment or Change Order;
14.6.3 The OWNER has been required to correct Defective Work or complete Work in accordance with Article 13; or
14.6.4 The CONSTRUCTION MANAGER has actual knowledge of the occurrence of any of the events enumerated in Article 15.
14.7 REJECTION OF PAYMENT BY OWNER - The OWNER may refuse to make payment of the full amount recommended by the CONSTRUCTION MANAGER because claims have been made against the OWNER on account of the CONTRACTOR's performance of the WORK or liens have been filed in connection with the WORK or there are other items entitling the OWNER to a credit against the amount recommended, but the OWNER must give the CONTRACTOR written notice within seven (7) Days (with a copy to the CONSTRUCTION MANAGER) stating the reasons for such action.
8.b
Packet Pg. 1498 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-54
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
14.8 SUBSTANTIAL COMPLETION
14.8.1 When the CONTRACTOR considers the WORK ready for its intended use the CONTRACTOR shall notify the CONSTRUCTION MANAGER in writing that the WORK is substantially complete. The CONTRACTOR shall attach to this notice a list of all work items that remain to be completed.
14.8.2 Within a reasonable time thereafter, the OWNER, the CONTRACTOR, and the CONSTRUCTION MANAGER shall make an inspection of the WORK to determine the status of completion.
14.8.3 If the CONSTRUCTION MANAGER does not consider the WORK substantially complete, or the list of remaining work items to be comprehensive, the CONSTRUCTION MANAGER will notify the CONTRACTOR in writing giving the reasons therefore.
14.8.4 If the CONSTRUCTION MANAGER considers the WORK substantially complete, the CONSTRUCTION MANAGER will prepare and deliver to the OWNER a Notice of Substantial Completion, which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before Final Payment. At the time of delivery of the Certificate of Substantial Completion, the CONSTRUCTION MANAGER will deliver to the OWNER and the CONTRACTOR a written recommendation as to division of responsibilities pending Final Payment between the OWNER and the CONTRACTOR with respect to security, operation, Safety, maintenance, heat utilities, insurance and warranties and guarantees.
14.8.5 The OWNER shall have the right to exclude the CONTRACTOR from the Work after the date of Substantial Completion, but the OWNER shall allow the CONTRACTOR reasonable access to complete or correct items on the list of remaining work items, or for Warranty Work.
14.9 PARTIAL UTILIZATION AND BENEFICIAL OCCUPANCY
14.9.1 Partial Utilization - The OWNER shall have the right to utilize or place into service any item of equipment or other usable portion of the WORK which is substantially complete prior to completion of all of the WORK. Whenever the OWNER plans to exercise said right, the CONTRACTOR will be notified in writing with a Notice of Partial Utilization signed by the
0WNER identifying the specific portion or portions of the WORK to be so utilized or otherwise placed into service. Liquidated damages will not be affected.
14.9.2 Beneficial Occupancy - The OWNER shall have the right to take control of the entire WORK if it is substantially completed. Whenever the OWNER plans to exercise said right the CONTRACTOR will be notified in writing with a Notice of Beneficial Occupancy. Such use by the OWNER will terminate liquidated damages.
14.9.3 Responsibility For Care and Maintenance - It shall be understood by the
8.b
Packet Pg. 1499 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-55
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
CONTRACTOR that until Beneficial Occupancy or Partial Utilization Notice is issued or start up begins all responsibility for care and maintenance of all of the WORK shall be the responsibility of the CONTRACTOR. Upon issuance of said written Notice of Beneficial Occupancy or Notice of Partial Utilization the OWNER will accept responsibility for the protection and maintenance of all such items or portions of the WORK described in the written notice.
14.9.4 CONTRACTOR Responsible For Completion- The CONTRACTOR shall retain full responsibility for satisfactory completion of the WORK, regardless of whether a portion thereof has been partially utilized by the OWNER.
14.10 FINAL INSPECTION - Upon written notice from the CONTRACTOR the entire WORK or an agreed portion thereof is complete, the CONSTRUCTION MANAGER will make a final inspection with the OWNER and the CONTRACTOR and will notify the CONTRACTOR in writing of all particulars in which this inspection reveals that the WORK is incomplete or defective. The CONTRACTOR shall immediately take such measures as are necessary to complete such WORK or remedy such deficiencies.
14.11 FINAL APPLICATION FOR PAYMENT - After the CONTRACTOR has completed all of the remaining work items referred to in Article 14, removed all temporary structures and utilities, cleared the site, delivered all maintenance and operating instructions, schedules, guarantees, Bonds, certificates of inspection, marked-up record documents and other documents, all as required by the Contract Documents, and after the CONSTRUCTION MANAGER has indicated that the WORK is acceptable, the CONTRACTOR may make application for Final Payment following the procedure for progress payments. The final Application for Payment shall be accompanied by all documentation called for in the Contract Documents, together with complete and legally effective releases or waivers satisfactory to the OWNER of all liens arising out of or filed in connection with the WORK. If the CONTRACTOR has specific claims outstanding he shall restate these claims by stating the nature of the claim, the basis for entitlement and the estimated value of the claim. The CONTRACTOR shall specifically release the OWNER from any other claims not renewed.
14.12 FINAL PAYMENT AND ACCEPTANCE
14.12.1 If, on the basis of the CONSTRUCTION MANAGER's observation of the WORK during construction and final inspection, and the CONSTRUCTION MANAGER's review of the final Application for Payment and accompanying documentation, all as required by the Contract Documents, the CONSTRUCTION MANAGER is satisfied that the WORK has been completed and the CONTRACTOR's other obligations under the Contract Documents have been fulfilled, then the CONSTRUCTION MANAGER will, within fourteen (14) Days after receipt of the final Application for Payment, indicate in writing the CONSTRUCTION MANAGER's recommendation of payment and present the Application to the OWNER for payment. The CONSTRUCTION MANAGER "'ill also prepare a Notice of Completion.
14.12.2 After acceptance of the WORK by the OWNER, the OWNER will make Final Payment to the CONTRACTOR of the amount remaining after deducting all prior payments and
8.b
Packet Pg. 1500 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-56
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
all amounts to be kept or retained under the provisions of the Contract Documents. The OWNER will sign the Notice of Completion and file the Notice of Completion with the County Recorder.
14.13 LIQUIDATED DAMAGES
14.13.1 Failure of the CONTRACTOR to complete the WORK within the time allowed will result in damages being sustained by the OWNER. For each consecutive calendar Day, or portion thereof, in excess of the time specified for completion of the WORK, the CONTRACTOR shall pay to the OWNER, or have withheld from monies due it, the sum provided for in the Contract Documents.
14.13.2 Execution of the Agreement shall constitute agreement by the OWNER and the CONTRACTOR specified liquidated damages is the minimum value of the costs and actual damage caused by failure of the CONTRACTOR to complete the WORK within the allotted time; that such sum is liquidated damages and shall not be construed as a penalty, and that such sum will be deducted from the Final Payment due the CONTRACTOR if such delay in completion occurs.
14.14 PARTIAL RELEASE OF RETENTION AT SUBSTANTIAL COMPLETION- If, through no fault of the CONTRACTOR, final completion of the WORK is significantly delayed and if the CONSTRUCTION MANAGER so confirms, then the OWNER shall, upon receipt of the CONTRACTOR's final Application for Payment and recommendation of the CONSTRUCTION MANAGER and without terminating the Agreement, make payment of the balance due for that portion of the WORK fully completed and accepted. If the remaining balance to be held by the OWNER for WORK not fully completed or corrected is less than the retainage set forth in the Agreement, and if Bonds have been furnished as required in Article 5, then the written consent of the surety to the payment of the balance due for that portion of the WORK fully completed and accepted shall be submitted by the CONTRACTOR to the CONSTRUCTION MANAGER with the Application for such payment. Such payment shall be made under the terms and conditions governing Final Payment, except that it shall not constitute a waiver of claims.
14.15 WAIVER OF CLAIMS - The making and acceptance of Final Payment will constitute:
14.15.1 OWNER - A waiver of all claims by the OWNER against the CONTRACTOR, except claims arising from unsettled Mechanic's Liens, from Defective Work appearing after final inspection pursuant to Article 14, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from the CONTRACTOR's continuing obligations under the Contract Documents; and
14.15.2 CONTRACTOR - A waiver of all claims by the CONTRACTOR against the OWNER other than those previously made in writing and still unsettled and specifically renewed in the Application for Payment.
8.b
Packet Pg. 1501 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-57
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
14.16 RELEASE OF RETAINAGE AND OTHER DEDUCTIONS - After executing the necessary documents to initiate the lien period, and not more than thirty-five (35) Days thereafter (based on a thirty (30) Day lien filing period and five (5) Day processing time), the OWNER will release to the CONTRACTOR the retainage funds withheld pursuant to the Agreement, less any deductions to cover pending third party claims and liquidated damages against the CONTRACTOR.
14.17 CONTRACTOR'S CONTINUING OBLIGATION - The CONTRACTOR's obligation to perform and complete the WORK in accordance with the Contract Documents shall be absolute. Neither recommendation of any progress or Final Payment by the CONSTRUCTION MANAGER, nor the issuance of a Notice of Completion, nor any payment by the OWNER to the CONTRACTOR under the Contract Documents, nor any use or occupancy of the WORK or any part thereof by the OWNER, nor any act of acceptance by the OWNER nor any failure to do so, nor any review of a Shop Drawing or Sample submittal, will constitute an acceptance of work not in accordance with the Contract Documents or a release of the CONTRACTOR's obligation to perform the WORK in accordance with the Contract Documents.
14.18 TERMINATION OF LIABILITY OF OWNER - The acceptance by the CONTRACTOR of the Final Payment referred to in Article 14 herein, shall be a release of the OWNER and CONSTRUCTION MANAGER from all claims of liability to the CONTRACTOR for anything done or furnished for, or relating to, the WORK or for any act or neglect of the OWNER or of any person relating to or affecting the WORK except demands against the OWNER for the remainder, if any, of the amounts kept or retained under the provisions of Article 14 herein; and excepting pending, unresolved claims renewed with the final Application for Payment.
ARTICLE 15 -- SUSPENSION OF WORK AND TERMINATION
15.1 SUSPENSION OF WORK BY OWNER - The OWNER, acting through the CONSTRUCTION MANAGER, may, at any time and without cause, suspend the WORK or any portion thereof for a period of not more than ninety (90) Days by notice in writing to the CONTRACTOR. The CONTRACTOR shall resume the WORK on receipt from the CONSTRUCTION MANAGER of a Notice of Resumption of Work. The CONTRACTOR may submit a request for a change in the Contract Price or of the Contract Time, or both, directly attributable to the suspension as provided in Articles 11 and 12.
15.2 ARCHAEOLOGICAL AND PALEONTOLOGICAL DISCOVERIES
15.2.1 If a discovery is made of an archaeological or paleontological interest, then the CONTRACTOR shall immediately cease operations in the area of the discovery and shall not continue until ordered by the CONSTRUCTION MANAGER. This suspension of work may exceed the ninety (90) Day limit without creating a right to terminate the Agreement for the CONTRACTOR. When resumed, operations within the area of the discovery shall be as directed by the CONSTRUCTION MANAGER.
8.b
Packet Pg. 1502 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-58
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
15.2.2 Discoveries which may be encountered may include, but not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, fossils or any item with culturally significance.
15.2.3 The CONTRACTOR shall be entitled to an extension of time and compensation in accordance with the provisions of the Contract Documents.
15.3 TERMINATION OF AGREEMENT BY OWNER FOR CAUSE
15.3.1 In the event of default by the CONTRACTOR. the OWNER shall give fourteen (14) Days written notice to the CONTRACTOR of the OWNER's intent to terminate the Agreement and provide the CONTRACTOR opportunity to remedy the conditions constituting the default.
15.3.2 CONTRACTOR Default - It shall be considered a default by the CONTRACTOR when the CONTRACTOR:
15.3.2.1 Declares bankruptcy, becomes insolvent, assigns its assets for the benefit of its creditors, or is unable to pay debts as they become due;
15.3.2.2 Fails to provide materials or workmanship meeting the requirements of the Contract Documents, and fails to correct the Defective Work as required by Article 13;
15.3.2.3 Disregards or violates provisions of the Contract Documents or the CONSTRUCTION MANAGER's instructions;
15.3.2.4 Fails to prosecute the WORK according to the approved progress schedule;
15.3.2.5 Fails to provide a qualified superintendent, competent workers, or materials or equipment meeting the requirements of the Contract Documents; or
15.3.2.6 Fails to maintain license or insurance.
15.3.3 If the CONTRACTOR fails to remedy the conditions constituting default within the time allowed, then the OWNER may then issue the Notice of Termination.
15.3.4 In the event the Agreement is terminated in accordance with Article 15, the OWNER may take possession of the WORK and may complete the WORK by whatever method or means the OWNER may select. The cost of completing the WORK shall be deducted from the balance which would have been due the CONTRACTOR had the Agreement not been terminated and the WORK completed in accordance with the Contract Documents. If such cost exceeds the balance which would have been due, then the CONTRACTOR shall pay the excess amount to the OWNER. If such cost is less than the balance which would have been due, the CONTRACTOR shall not have claim to the difference.
15.4 RIGHTS OF OWNER PRESERVED - Where the CONTRACTOR's services have been so terminated by the OWNER, the termination will not affect any rights or remedies of
8.b
Packet Pg. 1503 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-59
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
the OWNER against the CONTRACTOR then existing or which may thereafter accrue.
Any retention or payment of moneys due the CONTRACTOR by the OWNER will not release the CONTRACTOR from liability.
15.5 TERMINATION BY THE CITY FOR JUST CAUSE - The OWNER may terminate the Contract for just cause at its own discretion or when conditions encountered during the WORK make it impossible or impractical to proceed, or when the OWNER is prevented from proceeding with the Agreement by act of God, by law, or by official action of a public authority.
15.5.1 Termination for Convenience by OWNER
15.5.1.1 Termination of CONTRACTOR's Performance of WORK - The OWNER may terminate, subject to the express terms and conditions set forth below, the CONTRACTOR's performance of work under this Agreement in whole or, from time to time, in part, if the City Council does not appropriate sufficient monies to fund the Agreement. The City Manager shall terminate on behalf of the OWNER by delivering to the CONTRACTOR a Notice of Termination, in writing, specifying the extent of termination and the effective date
15.5.1.2 Notice of Termination - After receipt of the Notice of Termination, and except as otherwise directed by the City Manager, the CONTRACTOR shall immediately proceed as follows:
15.5.1.2.1 Stop WORK immediately or as specified in the Notice;
15.5.1.2.2 Immediately place no further subcontracts for materials, services, or facilities, except as necessary to complete any authorized, continued portion of the Agreement;
15.5.1.2.3 Immediately terminate all subcontracts to the extent they relate to the WORK terminated;
15.5.1.2.4 With approval by the City Manager, settle all outstanding obligations arising from the termination of subcontracts; the approval of which will be final for purposes of this clause;
15.5.1.2.5 As directed by the City Manager, transfer the title and deliver to the OWNER, completed or partially completed drawings, plans, calculations, specifications and any other documents and records that, if the Agreement has been completed, would be required to be furnished to the OWNER;
15.5.1.2.6 Complete performance of the WORK not terminated; and
15.5.1.2.7 Take any action that may be necessary, or that the City Manager may direct, for the protection and preservation of the property related to this Agreement that is in the possession of the CONTRACTOR and in which the CITY has or may acquire an interest
8.b
Packet Pg. 1504 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-60
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
15.5.1.3 Removal of OWNER's Property - The CONTRACTOR may request the OWNER to remove the OWNER’s property or enter into an agreement for its storage. Within sixty (60) Days, the OWNER will accept title of property and remove it or enter into a storage agreement.
15.5.1.4 Termination Settlement - After termination. the CONTRACTOR shall submit a final termination settlement proposal to the City Manager in the form and with the certification prescribed by the City Manager. The CONTRACTOR shall submit the proposal promptly, but not later than six (6) months after the effective date of termination, unless extended, in writing, by the City Manager upon written request of the CONTRACTOR within this six (6) month period. However, if the City Manager determines that the facts justify it a termination settlement proposal may be received and acted on after six (6) months or any extension. If the CONTRACTOR fails to submit the proposal within the time allowed, the OWNER may, in good faith, determine, on the basis of information available, the fair and reasonable amount, if any, due the CONTRACTOR as a result of the termination and pay the amount determined. If the CONTRACTOR does not agree that the amount determined by the City Manager is fair and reasonable, and if the CONTRACTOR gives notice of such disagreement to the CITY in accordance with this paragraph of the Agreement within thirty (30) Days of receipt of payment, then the amount due shall be as fixed in a court of law.
15.5.1.5 Payment for CONTRACTOR Due to Termination - Subject to the above paragraph, the CONTRACTOR and the City Manager may agree upon the whole or any part of the amount to be paid because of the termination. The amount may include a reasonable Allowance for profit on work done. However, the agreed amount, exclusive of costs shown in Paragraph 15.5.1.6.3 below, may not exceed the total dollar amount authorized by the 0\VNER as reduced by (1) the amount of payments previously made; and (2) the Contract Price of work not terminated. The Agreement shall be amended, and the CONTRACTOR paid the agreed amount. The paragraph below shall not limit, restrict, or affect the amount that may be agreed upon to be paid under this paragraph.
15.5.1.6 Failure to Agree on Payment - If the CONTRACTOR and the OWNER fail to agree on the whole amount to be paid because of the termination of WORK, then the OWNER shall pay the CONTRACTOR the fair and reasonable amounts determined in good faith by the OWNER as follows, but without duplication of any amounts agreed above:
15.5.1.6.1 The Contract Price for completed services accepted by the OWNER not previously paid for, adjusted for any saving of freight and other charges.
15.5.1.6.2 The total of:
15.5.1.6.2.1 The costs incurred in the performance of the WORK terminated, including initial costs and preparatory expense allocable thereto, but excluding any costs' attributable to services paid or to be paid under Paragraph 15.5 .1.6;
15.5.1.6.2.2 The fair and reasonable cost of settling and paying termination settlement proposals under terminated subcontracts that are properly chargeable to the terminated portion of the Agreement if not included in paragraph above; and
8.b
Packet Pg. 1505 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-61
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
15.5.1.6.2.3 A sum, as profit on the above paragraph determined by the City Manager to be fair and reasonable under the circumstances; however, if it appears that the CONTRACTOR would have sustained a loss on the entire Contract had it been completed, the OWNER shall allow no profit under this paragraph and shall reduce the settlement to reflect the indicated rate of loss.
15.5.1.6.3 The reasonable costs of settlement of the WORK terminated, including:
15.5.1.6.3.1 Accounting, legal, clerical, and other expenses reasonably necessary for the preparation of termination of settlement proposals and supporting data;
15.5.1.6.3.2 The termination and settlement of subcontracts (excluding the amounts of such settlements); and
15.5.1.6.3.3 Storage, transportation, and other costs incurred, reasonably necessary for the preservation, protection, or disposition of property in which the CITY has or may acquire an interest.
15.5.1.7 Dispute of Payment - If the CONTRACTOR does not agree the amount determined by the City Manager under the paragraph above is fair and reasonable and if the CONTRACTOR gives notice of such disagreement to the CITY in accordance with Paragraph 15.5.1.4 of this Agreement within thirty (30) Days of receipt of payment, then the amount due shall be as determined in a court of law.
15.5.1.8 Payment for Property Destroyed, Lost Stolen or Damaged - Except to the extent the OWNER expressly assumed the risk of loss, the City Manager shall exclude from the amounts payable to the CONTRACTOR under Paragraph 15.5.1.6 above, the fair value, as determined by the City Manager, of property that is destroyed. lost, stolen, or damaged so as to become undeliverable to the OWNER.
15.5.1.9 Determination of Amount Due CONTRACTOR - In arriving at the amount due the CONTRACTOR under this clause, there shall be deducted:
15.5.1.9.1 All unliquidated advance or other payments to the CONTRACTOR under the terminated portion of this Agreement;
15.5.1.9.2 Any claim which the CITY has against the CONTRACTOR under this Agreement; and
15.5.1.9.3 The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by the CONTRACTOR or sold under the provisions of this clause and not recovered by or credited to the OWNER.
15.5.2 Partial Termination - If the termination is partial, then the CONTRACTOR may file a proposal with the City Manager for an equitable adjustment of the price(s) of the continued
8.b
Packet Pg. 1506 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-62
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
portion of the Agreement. The OWNER shall make any equitable adjustment agreed upon.
Any proposal by the CONTRACTOR for an equitable adjustment under this clause shall be requested within ninety (90) Days after the effective date of termination unless extended, in writing, by the City Manager.
15.5.2.1 Partial Termination Payment -The OWNER may, under the terms and conditions it prescribes, make partial payment and payments against costs incurred by the CONTRACTOR for the terminated portion of the Agreement if the City Manager believes the total of these payments will not exceed the amount to which the CONTRACTOR will be entitled. If the total payments exceed amount finally determined to be due, the CONTRACTOR shall repay the excess to the OWNER upon demand, together with interest. Interest shall be at a rate of six percent (6%) per annum compounded daily and shall be computed for the period from the date the excess payment is received by the CONTRACTOR to the date the excess is repaid.
Interest shall not be charged on any excess payment due to a reduction in the CONTRACTOR's termination settlement proposal because of retention or disposition, or a later date determined by the City Manager because of the circumstances.
15.5.2.3 Records and Documents Relating to Termination - Unless otherwise provided in the Contract Documents or by statute. the CONTRACTOR shall maintain all records and documents relating to the terminated portion of this Agreement for three (3) years after final settlement.
This includes all books and other evidence bearing on the CONTRACTOR's costs and expenses under this Agreement. The CONTRACTOR shall make these records and documents available to the CITY at the CONTRACTOR's office, at all reasonable times, without any direct charge.
If approved by the City Manager. photographs, microphotographs, or other authentic reproductions may be maintained instead of original records and documents.
15.6 TERMINATION OF AGREEMENT BY CONTRACTOR - The CONTRACTOR may terminate the Agreement upon ten (10) Days written notice to the OWNER, whenever:
15.6.1 The WORK has been suspended under the provisions of Article 15, for more than ninety (90) consecutive Days through no fault or negligence of the CONTRACTOR, and notice to resume work or to terminate the Agreement has not been received from the OWNER within this time period; or
15.6.2 The OWNER fails to pay the CONTRACTOR any monies due him in accordance with the terms of the Contract Documents and within ninety (90) Days after presentation to the CONSTRUCTION MANAGER by the CONTRACTOR of a request therefor, unless within said ten (1 0) Day period the OWNER shall have remedied the condition upon which the payment delay was based.
15.6.3 In the event of such termination, the CONTRACTOR shall have no claims against the OWNER except for those claims specifically enumerated in Article 15, herein, and as determined in accordance with the requirements of said paragraph.
ARTICLE 16- DISPUTES
8.b
Packet Pg. 1507 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-63
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
16.1 GENERAL - All claims, counterclaims, disputes, and other matters in question arising under, or relating to, the Contract Documents or the breach thereof shall be processed in accordance with the provisions of this Article and are subject to audit by the OWNER's internal audit staff in accordance with Article 17.
16.2 REQUESTS FOR CHANGE
16.2.1 CONTRACTOR's Right To Request a Change - In accordance with Articles 11 and 12, the CONTRACTOR may request a change in the Contract Price or an extension of the Contract Time. Such a request shall be in writing, and shall be delivered to the CONSTRUCTION MANAGER within the time periods outlined in Articles 11 and 12.
16.2.2 Initial Determination - The CONSTRUCTION MANAGER shall make an initial determination on the CONTRACTOR's request in writing, within twenty (20) working Days of receipt of the requested supporting data.
16.2.3 CONTRACTOR Appeal and Claim - Should the CONTRACTOR disagree with the CONSTRUCTION MANAGER's initial determination, the CONTRACTOR may file a claim requesting a final determination from the CONSTRUCTION MANAGER. Such a request shall be in writing, and shall be delivered within twenty (20) working Days after receipt of the CONSTRUCTION MANAGER's initial determination, and after certifying his claim in accordance with Paragraph 16.3.
16.2.4 Waiver Of Rights - Failure of the CONTRACTOR to notify the CONSTRUCTION MANAGER and deliver supporting data in accordance with the time periods outlined above or failure to respond to the CONSTRUCTION MANAGER's initial determination within the time period outlined in this paragraph, shall be deemed to be a waiver of objection or right to further claim of this matter.
16.3 CLAIMS
16.3.1 Definition of Claim - A Claim means a written demand by the CONTRACTOR seeking an adjustment in Contract Price and payment of monies so due, an extension or shortening in Contract Time, or other relief arising under or relating to the Contract Documents following denial of the CONTRACTOR's request for the CONSTRUCTION MANAGER's initial determination. A written demand by the CONTRACTOR seeking the payment of money or an extension of time is not a Claim under this Article until certified as required below. A voucher, invoice, or other routine request for payment that is not in dispute when submitted, is not a Claim under this Article.
16.3.2 Claim Arising Under The Agreement - A claim arising under the Agreement, unlike a Claim relating to the Agreement, is a claim that can be resolved under an Agreement provision that provides for or excludes the relief sought by the claimant. Such claims shall be resolved under the applicable provisions of the Agreement.
8.b
Packet Pg. 1508 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-64
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
16.3.3 Period Of Claim - For any Claim under this Article to be valid, it shall be based upon written notice delivered by the CONTRACTOR to the CONSTRUCTION MANAGER promptly, but in no event later than twenty (20) working Days, after receipt of the CONSTRUCTION MANAGER's initial determination as outlined in Paragraph 16.2. The responsibility to substantiate claims shall rest with the party making the Claim.
16.3.4 Claim Certification Requirements - For all Claims by the CONTRACTOR seeking an increase in Contract Price or Contact Time, the CONTRACTOR shall submit with the Claim an affidavit certifying that:
16.3.4.1 Claim Made In Good Faith - The Claim is made in good faith, and the amount claimed accurately reflects the adjustments in Contract Price or Contract Time for which the CONTRACTOR believes the OWNER is liable, and covers all direct, supplemental, indirect, consequential, serial and cumulative costs and delays to which the CONTRACTOR is entitled as a result of the occurrence of the claimed event;
16.3.4.2 Cost And Pricing Data - Supporting Cost and Pricing Data are current, accurate, complete and represent the best of the CONTRACTOR's knowledge and belief; and
16.3.4.3 CONTRACTOR's Agent - If the CONTRACTOR is an individual, then the affidavit shall be executed by that individual; if the CONTRACTOR is not an individual, then the affidavit shall be executed by a senior company official in charge at the CONTRACTOR's plant or location involved, or a responsible officer or general partner of the CONTRACTOR.
16.3.5 Progress Schedule Analysis - All Claims for time shall be supported by an analysis of the CPM Progress Schedule detailing the impact of the claimed work on specific impacted schedule activities.
16.4 CLAIM RESOLUTION PROCESS
Notwithstanding anything to the contrary, the following provisions shall apply regarding claims:
As set out in Public Contract Code Section 9204 this provision shall apply to any claim by a contractor in connection with a public works project.
(c) For purposes of this section:
(1) “Claim” means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following:
(A) A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity.
8.b
Packet Pg. 1509 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-65
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
(2) “Contractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3) (A) “Public entity” means the City of El Centro.
(4) “Public works project” means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) “Subcontractor” means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply.
(2) (A) If the claimant disputes the public entity’s written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute.
(B) Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to
8.b
Packet Pg. 1510 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-66
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section.
(C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation.
Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties’ dispute.
(3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity’s failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum.
(5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so.
(e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section.
8.b
Packet Pg. 1511 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-67
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
(h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations.
16.5 VENUE
16.5.1 State of California - The CONTRACTOR, and any Subcontractor, Supplier and any other person or organization performing any part of WORK, agree that each of them will waive jurisdiction and venue and shall submit to the jurisdiction of the courts of the State of California regardless of residence or domicile, with respect to any actions or suits at law or in equity arising under or related to the Bid, award or performance of the WORK.
16.5.2 County Where OWNER’s Headquarters Located - The CONTRACTOR, Subcontractor, Supplier or any other person or organization shall not commence any action, other than those in the State of California in Imperial County, against the OWNER and the CONSTRUCTION MANAGER, or any of their consultants, and/or any of their respective directors, officers, employees, representatives or Agents, with regard to any matter whatsoever arising out of or relating to the validity, construction, interpretation or reinforcement of the Contract Documents.
ARTICLE 17 -- MISCELLANEOUS
17.1 GIVING NOTICE - Whenever any provision of the Contract Documents requires the giving of written notice. it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice.
17.2 CUMULATIVE REMEDIES - The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon the CONTRACTOR by the General Conditions and all of the rights and remedies available to the OWNER and the CONSTRUCTION MANAGER thereunder; are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws and Regulations, by special warranty or guarantee or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply.
17.3 PROFESSIONAL FEES AND COURT COSTS INCLUDED - Whenever reference is made to "claims, costs, losses and damages," it shall include in each case, but not be limited to, all fees and charges of Engineers, architects. and other professionals and all court or arbitration or other dispute resolution costs. Attorney fees are specifically excluded and shall be the responsibility of each party.
17.4 RIGHT TO AUDIT
8.b
Packet Pg. 1512 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-68
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
17.4.1 OWNER's Right - If the CONTRACTOR submits a claim or a Time and Material Change Order to the OWNER for additional compensation, then the OWNER shall have the right, as a condition to considering the claim, and as a basis for evaluation of the claim, and until the claim has been settled, to audit the CONTRACTOR's books to the extent they are relevant.
17.4.2 Right Includes - This right shall include the right to examine books, records, documents, and other evidence and accounting procedures and practices, sufficient to discover and verify all direct and indirect costs of whatever nature claimed to have been incurred or anticipated to be incurred and for which the claim has been submitted.
17.4.3 Right To Inspect Plans - The right to audit shall include the right to inspect the CONTRACTOR's plans, or such parts thereof, as may be or have been engaged in the performance of the WORK.
17.4.4 Applicability to Subcontractors - The CONTRACTOR further agrees the right to audit encompasses all subcontracts and is binding upon Subcontractors and each subcontract shall so state. The rights to examine and inspect herein provided for shall be exercisable through such representatives as the OWNER deems desirable during the CONTRACTOR's normal business hours at the office of the CONTRACTOR.
17.4.5 Accounting Records - The CONTRACTOR shall make available to the OWNER for auditing, all relevant accounting records and documents, and other financial data, and upon request, shall submit true copies of requested records to the OWNER.
17.5 ALL LEGAL PROVISIONS INCLUDED - All provisions of law required to be inserted in the Agreement or Contract Documents shall be and are inserted herein. If through mistake, neglect, oversight or otherwise, any such provision is not herein inserted or inserted in improper form, upon the application of either party, then the Agreement or Contract Documents shall be changed by the OWNER, at no increase in Contract Price or extension in Contract Time, so as to strictly comply with the law and without prejudice to the rights of either party hereunder.
17.6 NO CONFLICT WITH LAWS AND REGULATIONS
17.6.1 The duties, obligations, criteria or procedure imposed by these General Conditions and the rights and remedies made available are in addition to, and are not to be construed in any way as a limitation of any rights and remedies available to any or all of them which are otherwise imposed or available by Laws and Regulations, except that in the event that a specific part or detailed requirement of a provision, criterion or procedure in these General Conditions and a specific part or detailed requirement of a provision, criterion or procedure imposed or available by Laws and Regulations are in conflict, the specific part or detailed requirement of such provision, criterion or procedure imposed or available by Laws and Regulations in conflict shall govern. All other specific parts or detailed requirements in the provisions, criteria or procedures of the applicable Laws and Regulations and these General Conditions not in conflict shall remain in full force and effect and be read with the controlling specific part or detailed requirement.
8.b
Packet Pg. 1513 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) GENERAL CONDITIONS 00700H-69
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
17.6.2 The provisions of paragraph 17.6 will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply.
-END OF GENERAL CONDITIONS-
8.b
Packet Pg. 1514 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
THIS PAGE INTENTIONALLY LEFT BLANK
8.b
Packet Pg. 1515 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) SUPPLEMENTARY GENERAL CONDITIONS 00700H-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SECTION 00800H
SUPPLEMENTARY GENERAL CONDITIONS
GENERAL
These Supplementary General Conditions make additions, deletions, or revisions to the General Conditions as indicated herein. All provisions which are not so added, deleted, or revised remain in full force and effect.
SGC-1 DEFINITIONS
Terms used in these Supplementary General Conditions which are defined in the General Conditions have the meanings assigned to them in the General Conditions.
SGC-2 TIME OF COMPLETION
The WORK must be completed within three hundred sixty five (365) Calendar Days after the commencement date stated in the Notice to Proceed.
SGC-3 PHYSICAL CONDITIONS- SUBSURFACE AND EXISTING STRUCTURES In the preparation of the Contract Documents, the DESIGN CONSULTANT has relied upon a Field Survey, performed by the Sub-Consultant THG.
SGC-4 PERFORMANCE AND OTHER BOND AMOUNTS
The CONTRACTOR shall furnish a satisfactory Performance Bond in the amount of one hundred percent (100%) of the Contract Price and a satisfactory Payment Bond in the amount of one hundred percent (100%) of the Contract Price.
SGC-5 SUBCONTRACT LIMITATIONS
In addition to the provisions of Paragraph 6.5 of the General Conditions, the CONTRACTOR shall perform not less than twenty percent (20%) of the WORK with its own forces (i.e., without subcontracting). The twenty percent (20%) requirement shall be understood to refer to the WORK, the value of which totals not less than twenty percent (20%) of the Contract Price.
SGC-6 SAFETY
CONTRACTOR shall provide a qualified on-site health and Safety representative, accepted by OWNER, with the authority to enforce all of the Safety requirements of CONTRACTOR’s health and Safety program, including implementation of CONTRACTOR’s injury and illness prevention program. OWNER will make a risk-based decision as to the qualification level of CONTRACTOR’s Safety representative. During periods of active construction (i.e., excluding weekends, weather
8.b
Packet Pg. 1516 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) SUPPLEMENTARY GENERAL CONDITIONS 00700H-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
delays or other periods of work inactivity), CONTRACTOR must have a designated representative on the construction worksite who is knowledgeable of the Project’s hazards and has full authority to act on behalf of CONTRACTOR. CONTRACTOR’s designated representative must make frequent and regular inspections of the construction worksite to identify and correct any instances of noncompliance with the Project health and Safety requirements.
SGC-7 EQUIPMENT RENTAL RATES
The CONTRACTOR will be paid for the use of equipment at the rental rate listed for such equipment specified in the current edition of the following reference publication:
A. "Rental Rate Blue Book" as published by Dataquest (a company of the Dunn and Bradstreet Corporation), 1290 Ridder Park Drive, San Jose, CA 95131, telephone number (408) 437-8000 or outside of California (800) 669-3282.
SGC-8 INCLEMENT WEATHER DELAYS
The CONTRACTOR's construction schedule shall be based upon the inclusion of four (4) Days of inclement weather delays. An inclement weather delay is defined as a delay caused by inclement weather which prevents the CONTRACTOR from working on the controlling item in the CONTRACTOR's construction schedule. If the CONTRACTOR experiences inclement weather delays over the course of contract duration in excess of the number of Days outlined above. then the CONTRACTOR shall be granted a time extension in accordance with the provisions outlined in A11icle 12 of the General Conditions. The time extension shall be based on the number of inclement weather Days in excess of the number of Days outlined above.
SGC-8.1 LIQUIDATED DAMAGES
SGC-8.1.1 The OWNER and the CONTRACTOR recognize that time is of the essence of this Agreement and that the OWNER will suffer financial loss if the WORK is not completed within the time specified in Article 2 herein, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. They also recognize the delays, expense, and difficulties involved in proving in a legal preceding the actual loss suffered by the OWNER if the WORK is not completed on time. Accordingly, instead of requiring any such proof, the OWNER and the CONTRACTOR agree that as liquidated damages for delay (but not as a penalty) the CONTRACTOR shall pay two thousand dollars ($2,000.00) for every calendar Day that expires in excess of the time specified for final completion of the WORK. -END OF SUPPLEMENTARY GERNERAL CONDITIONS-
8.b
Packet Pg. 1517 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
THIS PAGE INTENTIONALLY LEFT BLANK
8.b
Packet Pg. 1518 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) STATE SUPPLEMENTARY GENERAL CONDITIONS 00700H-1
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
SECTION 00820H
SUPPLEMENTARY GENERAL CONDITIONS (STATE)
CALIFORNIA STATE REQUIREMENTS
1. State Wage Determinations:
a) As required by California Labor Code §§ 1770 et seq., the CONTRACTOR shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the office of the OWNER, which copies shall be made available to any interested party on request. The CONTRACTOR shall post a copy of such determination at each job site. b) In accordance with California Labor Code §1775, the CONTRACTOR shall, as a penalty to the OWNER, forfeit not more than two hundred dollars ($200) for each calendar Day or portion thereof, for each worker paid less than the prevailing rates as determined by the Director for the work or craft in which the worker is employed for any public work done under the Agreement by him or her or by any Subcontractor under him or her.
2. Workers' Compensation:
a) In accordance with the provisions of California Labor Code §3700, the CONTRACTOR shall secure the payment of compensation to his employees. b) Prior to beginning work under the Agreement, the CONTRACTOR shall sign and file with the OWNER the following certification:
''I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for Workers' Compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the WORK of this Agreement." c) Notwithstanding the foregoing provisions, before the Agreement is executed on behalf of the OWNER, a Bidder to whom the Agreement has been awarded shall furnish satisfactory evidence that it has secured in the manner required and provided by Jaw the payment of Workers' Compensation.
3. Apprentices on Public Works: The CONTRACTOR shall comply with all applicable provisions of California Labor Code §1777.5 relating to employment of apprentices on public works.
4. Working Hours: The CONTRACTOR shall comply with all applicable provisions of California Labor Code §§ 1810 through 1815, inclusive, relating to working hours.
The CONTRACTOR shall, as a penalty to the OWNER, forfeit twenty-five dollars ($25) for each worker employed in the execution of the Agreement by the CONTRACTOR or by any Subcontractor for each calendar Day during which such worker is required or permitted to
8.b
Packet Pg. 1519 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) STATE SUPPLEMENTARY GENERAL CONDITIONS 00700H-2
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
work more than eight (8) hours in any one (1) calendar Day and forty (40) hours in any one (1) calendar week, unless such worker receives compensation for all hours worked in excess of eight (8) hours at not less than one and one-half(1.5) times the basic rate of pay.
5. CONTRACTOR Not Responsible For Damage Resulting From Certain Acts of God: As provided in California Public Contract Code §7105, the CONTRACTOR shall not be responsible for the cost of repairing or restoring damage to the WORK which damage is determined to have been proximately caused by an act of God, in excess of five percent (5%) of the contracted amount, provided, that the WORK damaged was built in accordance with accepted and applicable building standards and the plans and Specifications of the OWNER.
The CONTRACTOR shall obtain insurance to indemnify the OWNER for any damage to the WORK caused by an act of God if the insurance premium is a separate Bid item in the Bid schedule for the WORK. For purposes of this section, the term "acts of God" shall include only the following occurrences or conditions and effects: earthquakes in excess of a magnitude of 3.5 on the Richter Scale and tidal waves.
6. Notice of Completion: In accordance with California Civil Code §§9204 and 9208, within fifteen (15) Days after date of acceptance of the WORK by the OWNER's governing body, the OWNER will file, in the County Recorder's office, a Notice of Completion of the WORK.
7. Unpaid Claims: If, at any time prior to the expiration of the period for service of a Stop Notice, there is served upon the OWNER a Stop Notice as provided in California Civil Code §§9350 et seq., then the OWNER shall, until the discharge thereof, withhold from the monies under its control so much of said monies due or to become due to the CONTRACTOR under this Agreement as shall be sufficient to answer the claim stated in such Stop Notice and to provide for the reasonable cost of any litigation thereunder; provided, that if the CONSTRUCTION MANAGER shall, in its discretion, permit the CONTRACTOR to file with the OWNER the bond referred to in Civil Code §9364, said monies shall not thereafter be withheld on account of such Stop Notice.
8. Concrete Forms, Falsework, and Shoring: The CONTRACTOR shall comply fully with the requirements of Section 17I7 of the Construction Safety Orders, State of California, Department of Industrial Relations, regarding the design of concrete forms, falsework and shoring, and the inspection of same prior to placement of concrete. Where the said Section 1717 requires the services of a civil engineer registered in the State of California to approve design calculations and working drawings of the falsework or shoring system, or to inspect such system prior to placement of concrete, the CONTRACTOR shall employ a registered civil engineer for these purposes, and all costs therefore shall be included in the price named in the Agreement for completion of the WORK as set forth in the Contract Documents.
9. Retainage From Monthly Payments: Pursuant to California Public Contract Code §22300, the CONTRACTOR may substitute securities for any money withheld by the OWNER
to insure performance under the Agreement. At the request and expense of the CONTRACTOR, securities equivalent to the amount withheld shall be deposited with the OWNER or with a
8.b
Packet Pg. 1520 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) STATE SUPPLEMENTARY GENERAL CONDITIONS 00700H-3
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
State or Federally-chartered bank as the escrow agent, who shall return such securities to the CONTRACTOR upon satisfactory completion of the Agreement. Deposit of securities with an escrow agent shall be subject to a written agreement between the escrow agent and the OWNER which provides that no portion of the securities shall be paid to the CONTRACTOR until the OWNER has certified to the escrow agent, in writing, that the Agreement has been satisfactorily completed. The OWNER will not certify that the Contract has been satisfactorily completed until at least thirty (30) Days after tiling by the OWNER of a Notice of Completion. Securities eligible for investment under §22300 shall be limited to those listed in Government Code § 16430 and to bank or savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by the CONTRACTOR and the OWNER.
10. Public Works Contracts; Assignment to Awarding Body: The CONTRACTOR and Subcontractor offers and agrees to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with §16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders Final Payment to the CONTRACTOR, without further acknowledgement by the parties.
11. Payroll Records; Retention; Inspection; Noncompliance Penalties; Rules and Regulations:
a) In accordance with California Labor Code §1776, the CONTRACTOR and each Subcontractor shall keep an accurate payroll record, showing the name, address, social security number, work classification, straight time and overtime hours worked each Day and week, and the actual per diem wages paid to each journeyman, apprentice, worker or other employee employed by him or her in connection with the public work. b) The payroll records enumerated under paragraph 11 (a) shall be certified and shall be available for inspection at all reasonable hours at the principal office of the CONTRACTOR on the following basis:
(I) A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or his or her authorized representative on request; and (2) A certified copy of all payroll records enumerated in paragraph 11 (a) shall be made available for inspection or furnished upon request to a representative of the body awarding the Agreement, the Division of Labor Standards Enforcement, and the Division of Apprenticeship Standards of the Department of lndustrial Relations; and (3) A certified copy of all payroll records enumerated in paragraph 11(a) shall be made available upon request by the public for inspection or copies thereof made; provided, however, that a request by the public shall be made through either the body awarding the Agreement, the Division of Apprenticeship Standards, or the Division of Labor Standards
8.b
Packet Pg. 1521 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) STATE SUPPLEMENTARY GENERAL CONDITIONS 00700H-4
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
Enforcement. If the requested payroll records have not been provided pursuant to paragraph 11(b) the requesting party shall, prior to being provided the records, reimburse the costs of preparation by the CONTRACTOR, Subcontractors and the entity through which the request was made. The public shall not be given access to the records at the principal office of the CONTRACTOR.
c) The CONTRACTOR shall tile a certified copy of the records, enumerated in paragraph J with the entity that requested the records within ten (10) Days after receipt of a written request.
d) Any copy of records made available for inspection as copies and furnished upon request to the public or any public City by the awarding body, the Division of Apprenticeship Standards, or the Division of Labor Standards Enforcement shall be marked or obliterated in such a manner as to prevent disclosure of an individual's name, address, and social security number. The name and address of the CONTRACTOR awarded the Agreement or performing the Agreement shall not be marked or obliterated.
e) The CONTRACTOR shall inform the body awarding the Agreement of the location of the records enumerated under paragraph 11(a) including the street address, city and county, and shall within five (5) working Days, provide a notice of change of location and address. f) In the event of noncompliance with the requirements of this section, the CONTRACTOR shall have ten (10) Days in which to comply subsequent to receipt of written notice specifying in what respects the CONTRACTOR must comply with this section. Should noncompliance still be evident after the ten (1 0) Day period, the CONTRACTOR shall, as a penalty to the state or political subdivision on whose behalf the Agreement is made or awarded, forfeit twenty-five dollars ($25) for each calendar Day, or portion thereof, for each worker, until strict compliance is effectuated. Upon the request of the Division of Apprenticeship Standards or the Division of Labor Standards Enforcement, these penalties shall be withheld from progress payments then due.
12. Cultural Resources: The CONTRACTOR's attention is directed to the provisions of the Clean Water Grant Program Bulletin 76A which augments the National Historic Preservation Act of 1966 (16 U.S.C. 470) as specified under Section 01560, "Temporary Environmental Controls" of the General Requirements.
13. Protection of Workers In Trench Excavations: As required by California Labor Code §6705 and in addition thereto, whenever work under the Contract Documents involves the excavation of any trench or trenches five (5) feet or more in depth, the CONTRACTOR shall submit for acceptance by the OWNER or by a registered civil or structural CONSTRUCTION MANAGER, employed by the OWNER, to whom authority to accept has been delegated, in advance of excavation, a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation, of such trench or trenches. If such plan varies from the shoring system standards established by the Construction Safety Orders of the Division of Industrial Safety, the plan shall be prepared by a registered civil or structural engineer employed
8.b
Packet Pg. 1522 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) STATE SUPPLEMENTARY GENERAL CONDITIONS 00700H-5
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
by the CONTRACTOR, and all costs therefore shall be inducted in the price named in the Agreement for completion of the WORK as set forth in the Contract Documents. Nothing in this section shall be deemed to allow the use of a shoring, sloping, or other protective system less effective than that required by the Construction Safety Orders. Nothing in this section shall be construed to impose tort liability on the OWNER, the CONSTRUCTION MANAGER, the DESIGN CONSULTANT or any of their officers, Agents, representatives, or employees.
14. Travel and Subsistence Pay:
a) As required by California Labor Code § 1773.1, the CONTRACTOR shall pay travel and subsistence payments to each worker needed to execute the WORK, as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with this section.
b) To establish such travel and subsistence payments, the representative of any craft, classification or type of worker needed to execute the Agreement shall file with the Department of Industrial Relations fully executed copies of collective bargaining agreements for the particular craft, classification or type of work involved. Such agreements shall be filed within ten (10) Days after their execution and thereafter shall establish such travel and subsistence payments whenever filed thirty (30) Days prior to the call for Bids.
15. Removal, Relocation, or Protection to Existing Utilities:
a) In accordance with the provisions of California Government Code §4215, any contract to which a public City as defined in Government Code §4401 is a party, the public City shall assume the responsibility, between the parties to the Agreement, for the timely removal, relocation, or protection of existing main or trunkline utility facilities located on the site of any construction project that is a subject of the Agreement, if such utilities are not identified by the public City in the plans and Specifications made a part of the invitation for Bids. The City will compensate the CONTRACTOR for the costs of locating, repairing damage not due to the failure of the CONTRACTOR to exercise reasonable care, and removing or relocating such utility facilities not indicated in the plans and Specifications with reasonable accuracy and for equipment on the Project necessarily idled during such work. b) The CONTRACTOR shall not be assessed liquidated damages for delay in completion of the Project, when such delay was caused by the failure of the public City or the owner of the utility to provide for removal or relocation of such utility facilities. c) Nothing herein shall be deemed to require the public City to indicate the presence of existing service laterals or appurtenances when the presence of such utilities on the site of the
Project can be inferred from the presence of other visible facilities, such as buildings, meter and junction boxes, on or adjacent to the site of construction; provided, however, nothing herein shall relieve the public City from identifying main or trunklines in the plans and Specifications.
8.b
Packet Pg. 1523 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) STATE SUPPLEMENTARY GENERAL CONDITIONS 00700H-6
09/2023/cdz/A23-0191/BidDocs/SouthernPumpStationProj
d) If the CONTRACTOR while performing the Agreement discovers utility facilities not identified by the public City in the Contract Documents, he shall immediately notify the public City and utility in writing.
e) The public utility, where they are the owner, shall have the sole discretion to perform such repairs or relocation work or permit the CONTRACTOR to do such repairs or relocation work at a reasonable price.
16. CONTRACTOR License Requirements: In accordance with California Business and Professions Code §7028.15, the CONTRACTOR shall not submit a Bid to a public City unless his or her contractor's license number appears clearly on the Bid, and the license expiration date is stated. Any Bid not containing this information, or a Bid containing information which is subsequently proven false, shall he considered nonresponsive and shall be rejected by the public City.
-END OF CALIFORNIA STATE REQUIREMENTS8.b
Packet Pg. 1524 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
THIS PAGE INTENTIONALLY LEFT BLANK
8.b
Packet Pg. 1525 Attachment: Volume I - Specifications (4185 : Approval of Plans and Specifications - Southern Pump Station Project) Ci ty
of El Centr
o
Sh i n ing wi th Oppor tun i ty
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-G01.dwg, 7/7/2023 1:19:51 PM, DWG To PDF.pc3
8.c
Packet Pg. 1526
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
KEY MAP & IID CROSSINGS
CROSS SECTIONS A-A, B-B & C-C ARE SHOWN ON SHEET G-3
SOUTHERN PUMP STATION
CITY OF EL CENTRO
LEGEND
PHASE 1B PHASE 1A
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-G02.dwg, 7/7/2023 1:19:59 PM, DWG To PDF.pc3
8.c
Packet Pg. 1527
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-G03.dwg, 7/7/2023 1:20:12 PM, DWG To PDF.pc3
8.c
Packet Pg. 1528
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project) LEGEND
ABBREVIATIONS
GENERAL NOTESSEWER NOTES
BASIS OF BEARINGS/BENCHMARK
MISCELLANEOUS LEGEND
SOUTHERN PUMP STATION
CITY OF EL CENTRO
PROJECT NOTES PROJECT NOTES (CONTINUED)
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-G04.dwg, 7/7/2023 1:20:19 PM, DWG To PDF.pc3
8.c
Packet Pg. 1529
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-D01.dwg, 7/7/2023 1:20:35 PM, DWG To PDF.pc3
8.c
Packet Pg. 1530
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C01.dwg, 7/7/2023 1:20:56 PM, DWG To PDF.pc3
8.c
Packet Pg. 1531
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C02.dwg, 7/7/2023 1:21:20 PM, DWG To PDF.pc3
8.c
Packet Pg. 1532
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C03.dwg, 7/7/2023 1:21:42 PM, DWG To PDF.pc3
8.c
Packet Pg. 1533
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C04.dwg, 7/7/2023 1:22:09 PM, DWG To PDF.pc3
8.c
Packet Pg. 1534
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C05.dwg, 7/7/2023 1:22:35 PM, DWG To PDF.pc3
8.c
Packet Pg. 1535
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C06.dwg, 7/7/2023 1:22:56 PM, DWG To PDF.pc3
8.c
Packet Pg. 1536
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C07.dwg, 7/7/2023 1:23:17 PM, DWG To PDF.pc3
8.c
Packet Pg. 1537
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C08.dwg, 7/7/2023 1:23:38 PM, DWG To PDF.pc3
8.c
Packet Pg. 1538
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C09.dwg, 7/7/2023 1:23:59 PM, DWG To PDF.pc3
8.c
Packet Pg. 1539
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C10.dwg, 7/7/2023 1:24:21 PM, DWG To PDF.pc3
8.c
Packet Pg. 1540
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C11.dwg, 7/7/2023 1:24:41 PM, DWG To PDF.pc3
8.c
Packet Pg. 1541
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C12.dwg, 7/7/2023 1:25:04 PM, DWG To PDF.pc3
8.c
Packet Pg. 1542
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C13.dwg, 7/7/2023 1:25:25 PM, DWG To PDF.pc3
8.c
Packet Pg. 1543
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C14.dwg, 7/7/2023 1:25:45 PM, DWG To PDF.pc3
8.c
Packet Pg. 1544
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C15.dwg, 7/7/2023 1:26:10 PM, DWG To PDF.pc3
8.c
Packet Pg. 1545
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C16.dwg, 7/7/2023 1:26:28 PM, DWG To PDF.pc3
8.c
Packet Pg. 1546
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C17.dwg, 7/7/2023 1:26:49 PM, DWG To PDF.pc3
8.c
Packet Pg. 1547
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C18.dwg, 7/7/2023 1:27:09 PM, DWG To PDF.pc3
8.c
Packet Pg. 1548
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C19.dwg, 7/7/2023 1:27:28 PM, DWG To PDF.pc3
8.c
Packet Pg. 1549
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C20.dwg, 7/7/2023 1:27:48 PM, DWG To PDF.pc3
8.c
Packet Pg. 1550
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C21.dwg, 7/7/2023 1:28:08 PM, DWG To PDF.pc3
8.c
Packet Pg. 1551
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C22.dwg, 7/7/2023 1:28:26 PM, DWG To PDF.pc3
8.c
Packet Pg. 1552
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C23.dwg, 7/7/2023 1:28:43 PM, DWG To PDF.pc3
8.c
Packet Pg. 1553
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C24.dwg, 7/7/2023 1:28:55 PM, DWG To PDF.pc3
8.c
Packet Pg. 1554
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C25.dwg, 7/7/2023 1:29:01 PM, DWG To PDF.pc3
8.c
Packet Pg. 1555
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C26.dwg, 7/7/2023 1:29:08 PM, DWG To PDF.pc3
8.c
Packet Pg. 1556
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C27.dwg, 7/7/2023 1:29:14 PM, DWG To PDF.pc3
8.c
Packet Pg. 1557
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C28.dwg, 7/7/2023 1:29:22 PM, DWG To PDF.pc3
8.c
Packet Pg. 1558
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C29.dwg, 7/7/2023 1:29:28 PM, DWG To PDF.pc3
8.c
Packet Pg. 1559
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C30.dwg, 7/7/2023 1:29:34 PM, DWG To PDF.pc3
8.c
Packet Pg. 1560
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C31.dwg, 7/7/2023 1:29:40 PM, DWG To PDF.pc3
8.c
Packet Pg. 1561
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-C32.dwg, 7/7/2023 1:29:46 PM, DWG To PDF.pc3
8.c
Packet Pg. 1562
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-M01.dwg, 7/7/2023 1:29:59 PM, DWG To PDF.pc3
8.c
Packet Pg. 1563
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-M02.dwg, 7/7/2023 1:30:08 PM, DWG To PDF.pc3
8.c
Packet Pg. 1564
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-L01.dwg, 7/7/2023 1:30:20 PM, DWG To PDF.pc3
8.c
Packet Pg. 1565
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-L02.dwg, 7/7/2023 1:30:41 PM, DWG To PDF.pc3
8.c
Packet Pg. 1566
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-L03.dwg, 7/7/2023 1:30:53 PM, DWG To PDF.pc3
8.c
Packet Pg. 1567
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-L04.dwg, 7/7/2023 1:31:01 PM, DWG To PDF.pc3
8.c
Packet Pg. 1568
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-L05.dwg, 7/7/2023 1:31:08 PM, DWG To PDF.pc3
8.c
Packet Pg. 1569
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project)
SOUTHERN PUMP STATION
CITY OF EL CENTRO
BENCH MARK:POINT #1
APPROXIMATE LOCATION OF R/W
DEPICTED ON ASSESSORS MAPSNO RECORDED DOCUMENTS FOUND
APPROXIMATE LOCATION OF R/W
DEPICTED ON ASSESSORS MAPS
NO RECORDED DOCUMENTS FOUND MADISON PROPERTY GROUP LLC
OWNERSHIP TO CL WITH NO
RECORDED RW DOCUMENTS FOUND
VALLEY NITROGEN PRODUCERS INC.
OWNERSHIP TO CL WITH NO
RECORDED RW DOCUMENTS FOUND
S:\5ELC011100 - Southern Pump Station\WATRES\TASKS\Construction-Plans\SHEETS\IP-SURVEY01.dwg, 7/7/2023 1:31:32 PM, DWG To PDF.pc3
8.c
Packet Pg. 1570
Attachment: Final Plans July 2023 Signed (4185 : Approval of Plans and Specifications - Southern Pump Station Project) City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Public Works
El Centro, CA 92243 Category: Proclamation
Prepared By: Catherine Gutierrez
SCHEDULED Department Head: Abraham Campos
RESOLUTION (ID # 6348) DOC ID: 6348
Approve Resolution Terminating Proclamation of Local
Emergency of Imperial and Villa Emergency Repairs
CITY MANAGER’S RECOMMENDATION:
Approve Resolution No. 24 - , TERMINATING RESOLUTION NO. 23-66
PROCLAIMING A LOCAL EMERGENCY AT IMPERIAL AVENUE AND VILLA AVENUE
LOCAL EMERGENCY IN THE CITY OF EL CENTRO
FISCAL IMPACT:
No impact to general fund. Project funded by Wastewater Enterprise funds. Expected reimbursement from CalOES for portion of costs.
Below are the costs for the repair:
Pyramid (CCO No.5 & No.6) $ 547,906.00
Rove Engineering (CCO No.1 & No. 4) $ 408,868.87
Rain for Rent $ 469,550.34
The Holt Group $ 29,625.00
A&R Construction $ 5,002.50
Total $1,460,952.71
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal #2 Environmental Sustainability and Infrastructure, Action 2.8: Ensure that infrastructure is thoughtfully designed and maintained to meet the current and future needs of the community while minimizing negative financial impacts.
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
N/A
BACKGROUND:
On June 9, 2023, during a routine sewer main inspection, a large void was discovered in a sewer inspection hole wall at the Imperial Avenue and Villa Avenue Intersection. A large void was discovered under the intersection on the other side of said hole. Staff implemented traffic control measures to protect the area from collapsing and producing additional damage.
City Code Section 2-185.14 provides that the City Manager is authorized to task direct emergency repairs and notify the Council of that action.
A Local Emergency Proclamation was approved by the City Council on June 26, 2023 through Resolution No. 23-66.
9 Packet Pg. 1571
Resolution (ID # 6348) Meeting of May 7, 2024
On September 7, 2023, Rove's CCO 1 in the amount of $332,000 was approved for the 2023 Streets Overlay Project.
On September 27, 2023, council approved the execution of Pyramid's contract change order 5 in the amount of $334,506.00 and approve a revised budget for the Dogwood Road Improvements at Wake Ave. & Danenberg Dr. project.
On January 16, 2024 council approved the execution of Pyramid's contract change order 6 in the amount of $213,400 and approved a revised budget for the Dogwood Road Improvements at Wake Ave. & Danenberg Dr. project.
On March 5, 2024 council approved the execution of Rove's contract change order 4 in the amount of $247,398.15 and approved a revised budget for the 2023 Streets Overlay Project.
DISCUSSION:
The emergency repairs at Imperial Avenue and Villa intersection have been completed and the roadway is fully open. City staff continues to work with CalOES for reimbursement of costs related to this emergency.
CONCLUSION:
Approve Resolution No. 24 - , TERMINATING RESOLUTION NO. 23-66
PROCLAIMING A LOCAL EMERGENCY AT IMPERIAL AVENUE AND VILLA AVENUE
LOCAL EMERGENCY IN THE CITY OF EL CENTRO
ATTACHMENTS:
· Resolution 00075119 (PDF)
9 Packet Pg. 1572
04/2024/cdz/A24-0070/Reso/TerminationofLocalEmergency
ImperialandVillaAve
RESOLUTION NO. 24 -
TERMINATING RESOLUTION NO. 23-66 PROCLAIMING
A LOCAL EMERGENCY AT IMPERIAL AVENUE AND
VILLA AVENUE LOCAL EMERGENCY IN THE CITY OF
EL CENTRO
WHEREAS, the California Emergency Services Act, including, but not limited to, Government Code Sections 8630 et seq, and Chapter 8, Article 1 empower the City to proclaim the existence or threatened existence of a local emergency in the City and to terminate such local emergency when the threat ends; and
WHEREAS, on June 26, 2023, pursuant to Resolution No. 23-66, the City Council of the City of El Centro proclaimed a local emergency as allowed by state law and as defined in City Municipal Code Section 8.2 due to needed emergency repairs for a sewer maintenance hole at the intersection of Villa Avenue and Imperial Avenue; and
WHEREAS, as of April 22, 2024, the conditions of peril resulting from Imperial Avenue and Villa Avenue, specifically to certain sewer maintenance no longer continue within the City and thus such declaration should be terminated.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, HEREBY PROCLAIMS AND ORDERS AS FOLLOWS:
1. That the recitals set out above are true and correct and are incorporated herein as though set forth in full.
2. The City Council has reviewed the proclamation of local emergency and finds that such emergency no longer exists.
3. That the City Council therefore terminates such local emergency as proclaimed by Resolution No. 23-66 and rescinds that Resolution.
4. That this Resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California held on day of , 2024.
9.a
Packet Pg. 1573 Attachment: Resolution 00075119 (6348 : Ending Proclamation of Imperial and Villa Emergency) 04/2024/cdz/A24-0070/Reso/TerminationofLocalEmergency
ImperialandVillaAve
CITY OF EL CENTRO
By _____________________
Sylvia Marroquin, Mayor
ATTEST:
By _____________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
By________________________________
Elizabeth L. Martyn, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By__________________________
Norma Wyles, City Clerk
9.a
Packet Pg. 1574 Attachment: Resolution 00075119 (6348 : Ending Proclamation of Imperial and Villa Emergency) City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Police
El Centro, CA 92243 Category: Resolution
Prepared By: Amanda Curiel
SCHEDULED Department Head: Robert Sawyer
RESOLUTION (ID # 6360) DOC ID: 6360
Flock Automated Licence Plate Recognition Camera
Expansion
CITY MANAGER’S RECOMMENDATION:
Adopt Resolution No. 24- , RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EL CENTRO AUTHORIZING THE EL CENTRO POLICE DEPARTMENT TO ENTER INTO AN AGREEMENT WITH FLOCK GROUP INC., FOR THE
INSTALLATION AND USE OF INTERSECTION CAMERAS
FISCAL IMPACT:
$125,000.00
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal#3: Community Health, Safety & Welfare
DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
N/A
BACKGROUND:
All current participating agencies in the county-wide, regional, ALPR system greatly increased their abilities for proactive law enforcement efforts, help with investigations, and act as a force multiplier to officers in the field.
DISCUSSION:
The El Centro Police Department (host agency) currently participates in the Imperial County Regional Automated License Plate Recognition (ALPR) program. Law enforcement officers are often searching for vehicles that have been reported stolen, are suspected of being involved in criminal or terrorist activities, are owned by persons who are wanted by authorities, have failed to pay parking violations or maintain current vehicle license registration.
Law enforcement agencies are charged with protecting the public as well as investigating crimes and criminal conduct.
ALPR system serve four specific public safety goals. Specifically, ALPR data can be used: (a) in various forms of crime analysis; (b) to alert law enforcement officials that a license plate number on a hot list is nearby; (c) to monitor the movements of vehicles operated by individuals' subject to geographical limitations on their travel (e.g. sex offenders, probationers and parolees, or individuals subject to court-imposed restrictions); and (d) to identify instances of criminal conduct that might have previously gone undetected without the aid of the ALPR system.
The continued use of ALPR technology serves to enhance the services and operations 10 Packet Pg. 1575
Resolution (ID # 6360) Meeting of May 7, 2024
capabilities of the El Centro Police Department.
CONCLUSION:
Adopt Resolution No. 24- , RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EL CENTRO AUTHORIZING THE EL CENTRO POLICE DEPARTMENT TO ENTER INTO AN AGREEMENT WITH FLOCK GROUP INC., FOR THE
INSTALLATION AND USE OF INTERSECTION CAMERAS
ATTACHMENTS:
· Flock Agreement (DOCX)
· Flock Resolution (DOCX)
10 Packet Pg. 1576
Master Services Agreement
This Master Services Agreement (this “Agreement”) is entered into by and between Flock Group, Inc. with a place of business at 1170 Howell Mill Road NW Suite 210, Atlanta, GA 30318 (“Flock”) and the entity identified in the signature block (“Customer”) (each a “Party,” and together, the “Parties”) on this the 09 day of April 2024. This Agreement is effective on the date of mutual execution (“Effective Date”). Parties will sign an Order Form (“Order Form”) which will describe the Flock Services to be performed and the period for performance, attached hereto as Exhibit A. The Parties agree as follows:
RECITALS
WHEREAS, Flock offers a software and hardware situational awareness solution through Flock’s technology platform that upon detection is capable of capturing audio, video, image, and recording data and provide notifications to Customer (“Notifications”); WHEREAS, Customer desires access to the Flock Services (defined below) on existing devices, provided by Customer, or Flock provided Flock Hardware (as defined below) in order to create, view, search and archive Footage and receive Notifications, via the Flock Services; WHEREAS, Customer shall have access to the Footage in Flock Services. Pursuant to Flock’s standard Retention Period (defined below) Flock deletes all Footage on a rolling thirty (30) day basis, except as otherwise stated on the Order Form. Customer shall be responsible for extracting, downloading and archiving Footage from the Flock Services on its own storage devices; and
WHEREAS, Flock desires to provide Customer the Flock Services and any access thereto, subject to the terms and conditions of this Agreement, solely for the awareness, prevention, and prosecution of crime, bona fide investigations and evidence gathering for law enforcement purposes, (“Permitted Purpose”).
AGREEMENT
10.a
Packet Pg. 1577 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) NOW, THEREFORE, Flock and Customer agree that this Agreement, and any Order Form, purchase orders, statements of work, product addenda, or the like, attached hereto as exhibits and incorporated by reference, constitute the complete and exclusive statement of the Agreement of the Parties with respect to the subject matter of this Agreement, and replace and supersede all prior agreements, term sheets, purchase orders, correspondence, oral or written communications and negotiations by and between the Parties.
1. DEFINITIONS
Certain capitalized terms, not otherwise defined herein, have the meanings set forth or crossreferenced in this Section 1.
1.1 “Anonymized Data” means Customer Data permanently stripped of identifying details and any potential personally identifiable information, by commercially available standards which irreversibly alters data in such a way that a data subject (i.e., individual person or entity) can no longer be identified directly or indirectly.
1.2 “Authorized End User(s)” means any individual employees, agents, or contractors of Customer accessing or using the Services, under the rights granted to Customer pursuant to this Agreement.
1.3 “Customer Data” means the data, media and content provided by Customer through the Services. For the avoidance of doubt, the Customer Data will include the Footage.
1.4. “Customer Hardware” means the third-party camera owned or provided by Customer and any other physical elements that interact with the Embedded Software and the Web Interface to provide the Services.
1.5 “Embedded Software” means the Flock proprietary software and/or firmware integrated with or installed on the Flock Hardware or Customer Hardware.
1.6 “Flock Hardware” means the Flock device(s), which may include the pole, clamps, solar panel, installation components, and any other physical elements that interact with the Embedded Software and the Web Interface, to provide the Flock Services as specifically set forth in the applicable product addenda.
10.a
Packet Pg. 1578 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
1.7 “Flock IP” means the Services, the Embedded Software, and any intellectual property or proprietary information therein or otherwise provided to Customer and/or its Authorized End Users. Flock IP does not include Footage (as defined below).
1.8 “Flock Network End User(s)” means any user of the Flock Services that Customer authorizes access to or receives data from, pursuant to the licenses granted herein.
1.9 “Flock Services” means the provision of Flock’s software and hardware situational awareness solution, via the Web Interface, for automatic license plate detection, alerts, audio detection, searching image records, video and sharing Footage.
1.10 “Footage” means still images, video, audio and other data captured by the Flock Hardware or Customer Hardware in the course of and provided via the Flock Services.
1.11 “Hotlist(s)” means a digital file containing alphanumeric license plate related information pertaining to vehicles of interest, which may include stolen vehicles, stolen vehicle license plates, vehicles owned or associated with wanted or missing person(s), vehicles suspected of being involved with criminal or terrorist activities, and other legitimate law enforcement purposes. Hotlist also includes, but is not limited to, national data (i.e., NCIC) for similar categories, license plates associated with AMBER Alerts or Missing Persons/Vulnerable Adult Alerts, and includes manually entered license plate information associated with crimes that have occurred in any local jurisdiction.
1.12 “Installation Services” means the services provided by Flock for installation of Flock Services.
1.13 “Retention Period” means the time period that the Customer Data is stored within the cloud storage, as specified in the product addenda.
1.14 “Vehicle Fingerprint™” means the unique vehicular attributes captured through Services such as: type, make, color, state registration, missing/covered plates, bumper stickers, decals, roof racks, and bike racks.
1.15 “Web Interface” means the website(s) or application(s) through which Customer and its Authorized End Users can access the Services.
10.a
Packet Pg. 1579 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
2. SERVICES AND SUPPORT
2.1 Provision of Access. Flock hereby grants to Customer a non-exclusive, non-transferable right to access the features and functions of the Flock Services via the Web Interface during the Term, solely for the Authorized End Users. The Footage will be available for Authorized End Users to access and download via the Web Interface for the data retention time defined on the Order Form (“Retention Period”). Authorized End Users will be required to sign up for an account and select a password and username (“User ID”). Customer shall be responsible for all acts and omissions of Authorized End Users, and any act or omission by an Authorized End User which, including any acts or omissions of authorized End user which would constitute a breach of this agreement if undertaken by customer. Customer shall undertake reasonable efforts to make all Authorized End Users aware of all applicable provisions of this Agreement and shall cause Authorized End Users to comply with such provisions. Flock may use the services of one or more third parties to deliver any part of the Flock Services, (such as using a third party to host the Web Interface for cloud storage or a cell phone provider for wireless cellular coverage).
2.2 Embedded Software License. Flock grants Customer a limited, non-exclusive, nontransferable, non-sublicensable (except to the Authorized End Users), revocable right to use the Embedded Software as it pertains to Flock Services, solely as necessary for Customer to use the Flock Services.
2.3 Support Services. Flock shall monitor the Flock Services, and any applicable device health, in order to improve performance and functionality. Flock will use commercially reasonable efforts to respond to requests for support within seventy-two (72) hours. Flock will provide Customer with reasonable technical and on-site support and maintenance services in-person, via phone or by email at [email protected] (such services collectively referred to as “Support Services”).
2.4 Upgrades to Platform. Flock may make any upgrades to system or platform that it deems necessary or useful to (i) maintain or enhance the quality or delivery of Flock’s products or services to its agencies, the competitive strength of, or market for, Flock’s products or services, such platform or system’s cost efficiency or performance, or (ii) to comply with applicable law.
Parties understand that such upgrades are necessary from time to time and will not diminish the quality of the services or materially change any terms or conditions within this Agreement.
10.a
Packet Pg. 1580 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
2.5 Service Interruption. Services may be interrupted in the event that: (a) Flock’s provision of the Services to Customer or any Authorized End User is prohibited by applicable law; (b) any third-party services required for Services are interrupted; (c) if Flock reasonably believe Services are being used for malicious, unlawful, or otherwise unauthorized use; (d) there is a threat or attack on any of the Flock IP by a third party; or (e) scheduled or emergency maintenance (“Service Interruption”). Flock will make commercially reasonable efforts to provide written notice of any Service Interruption to Customer, to provide updates, and to resume providing access to Flock Services as soon as reasonably possible after the event giving rise to the Service Interruption is cured. Flock will have no liability for any damage, liabilities, losses (including any loss of data or profits), or any other consequences that Customer or any Authorized End User may incur as a result of a Service Interruption. To the extent that the Service Interruption is not caused by Customer’s direct actions or by the actions of parties associated with the Customer, the time will be tolled by the duration of the Service Interruption (for any continuous suspension lasting at least one full day). For example, in the event of a Service Interruption lasting five (5) continuous days, Customer will receive a credit for five (5) free days at the end of the Term.
2.6 Service Suspension. Flock may temporarily suspend Customer’s and any AuthorizedEnd User’s access to any portion or all of the Flock IP or Flock Service if (a) there is a threat or attack on any of the Flock IP by Customer; (b) Customer’s or any Authorized End User’s use of the Flock IP disrupts or poses a security risk to the Flock IP or any other customer or vendor of Flock; (c) Customer or any Authorized End User is/are using the Flock IP for fraudulent or illegal activities; (d) Customer has violated any term of this provision, including, but not limited to, utilizing Flock Services for anything other than the Permitted Purpose; or (e) any unauthorized access to Flock Services through Customer’s account (“Service Suspension”).
Customer shall not be entitled to any remedy for the Service Suspension period, including any reimbursement, tolling, or credit. If the Service Suspension was not caused by Customer, the Term will be tolled by the duration of the Service Suspension.
2.7 Hazardous Conditions. Flock Services do not contemplate hazardous materials, or other hazardous conditions, including, without limit, asbestos, lead, toxic or flammable substances. In the event any such hazardous materials are discovered in the designated locations in which Flock
10.a
Packet Pg. 1581 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) is to perform services under this Agreement, Flock shall have the right to cease work immediately.
3. CUSTOMER OBLIGATIONS
3.1 Customer Obligations. Flock will assist Customer Authorized End Users in the creation of a User ID. Authorized End Users agree to provide Flock with accurate, complete, and updated registration information. Authorized End Users may not select as their User ID, a name that they do not have the right to use, or any other name with the intent of impersonation. Customer and Authorized End Users may not transfer their account to anyone else without prior written permission of Flock. Authorized End Users shall not share their account username or password information and must protect the security of the username and password. Unless otherwise stated and defined in this Agreement, Customer shall not designate Authorized End Users for persons who are not officers, employees, or agents of Customer. Authorized End Users shall only use Customer-issued email addresses for the creation of their User ID. Customer is responsible for any Authorized End User activity associated with its account. Customer shall ensure that Customer provides Flock with up to date contact information at all times during the Term of this agreement. Customer shall be responsible for obtaining and maintaining any equipment and ancillary services needed to connect to, access or otherwise use the Flock Services. Customer shall (at its own expense) provide Flock with reasonable access and use of Customer facilities and Customer personnel in order to enable Flock to perform Services (such obligations of Customer are collectively defined as “Customer Obligations”).
3.2 Customer Representations and Warranties. Customer represents, covenants, and warrants that Customer shall use Flock Services only in compliance with this Agreement and all applicable laws and regulations, including but not limited to any laws relating to the recording or sharing of data, video, photo, or audio content.
4. DATA USE AND LICENSING
4.1 Customer Data. As between Flock and Customer, all right, title and interest in the Customer Data, belong to and are retained solely by Customer. Customer hereby grants to Flock a limited, non-exclusive, royalty-free, irrevocable, worldwide license to use the Customer Data and perform all acts as may be necessary for Flock to provide the Flock Services to Customer. Flock does not own and shall not sell Customer Data.
10.a
Packet Pg. 1582 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
4.2 Customer Generated Data. Flock may provide Customer with the opportunity to post, upload, display, publish, distribute, transmit, broadcast, or otherwise make available, messages, text, illustrations, files, images, graphics, photos, comments, sounds, music, videos, information, content, ratings, reviews, data, questions, suggestions, or other information or materials produced by Customer (“Customer Generated Data”). Customer shall retain whatever legally cognizable right, title, and interest in Customer Generated Data. Customer understands and acknowledges that Flock has no obligation to monitor or enforce Customer’s intellectual property rights of Customer Generated Data. Customer grants Flock a non-exclusive, irrevocable, worldwide, royalty-free, license to use the Customer Generated Data for the purpose of providing Flock Services. Flock does not own and shall not sell Customer Generated Data.
4.3 Anonymized Data. Flock shall have the right to collect, analyze, and anonymize Customer Data and Customer Generated Data to the extent such anonymization renders the data nonidentifiable to create Anonymized Data to use and perform the Services and related systems and technologies, including the training of machine learning algorithms. Customer hereby grants Flock a non-exclusive, worldwide, perpetual, royalty-free right to use and distribute such Anonymized Data to improve and enhance the Services and for other development, diagnostic and corrective purposes, and other Flock offerings. Parties understand that the aforementioned license is required for continuity of Services. Flock does not own and shall not sell Anonymized Data.
5. CONFIDENTIALITY; DISCLOSURES
5.1 Confidentiality. To the extent required by any applicable public records requests, each Party (the “Receiving Party”) understands that the other Party (the “Disclosing Party”) has disclosed or may disclose business, technical or financial information relating to the Disclosing Party’s business (hereinafter referred to as “Proprietary Information” of the Disclosing Party).
Proprietary Information of Flock includes non-public information regarding features, functionality and performance of the Services. Proprietary Information of Customer includes non-public data provided by Customer to Flock or collected by Flock via Flock Services, which includes but is not limited to geolocation information and environmental data collected by sensors. The Receiving Party agrees: (i) to take the same security precautions to protect against disclosure or unauthorized use of such Proprietary Information that the Party takes with its own
10.a
Packet Pg. 1583 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) proprietary information, but in no event less than commercially reasonable precautions, and (ii) not to use (except in performance of the Services or as otherwise permitted herein) or divulge to any third person any such Proprietary Information. The Disclosing Party agrees that the foregoing shall not apply with respect to any information that the Receiving Party can document (a) is or becomes generally available to the public; or (b) was in its possession or known by it prior to receipt from the Disclosing Party; or (c) was rightfully disclosed to it without restriction by a third party; or (d) was independently developed without use of any Proprietary Information of the Disclosing Party. Nothing in this Agreement will prevent the Receiving Party from disclosing the Proprietary Information pursuant to any judicial or governmental order, provided that the Receiving Party gives the Disclosing Party reasonable prior notice of such disclosure to contest such order. At the termination of this Agreement, all Proprietary Information will be returned to the Disclosing Party, destroyed or erased (if recorded on an erasable storage medium), together with any copies thereof, when no longer needed for the purposes above, or upon request from the Disclosing Party, and in any case upon termination of the Agreement.
Notwithstanding any termination, all confidentiality obligations of Proprietary Information that is trade secret shall continue in perpetuity or until such information is no longer trade secret.
5.2 Usage Restrictions on Flock IP. Flock and its licensors retain all right, title and interest in and to the Flock IP and its components, and Customer acknowledges that it neither owns nor acquires any additional rights in and to the foregoing not expressly granted by this Agreement.
Customer further acknowledges that Flock retains the right to use the foregoing for any purpose in Flock’s sole discretion. Customer and Authorized End Users shall not: (i) copy or duplicate any of the Flock IP; (ii) decompile, disassemble, reverse engineer, or otherwise attempt to obtain or perceive the source code from which any software component of any of the Flock IP is compiled or interpreted, or apply any other process or procedure to derive the source code of any software included in the Flock IP; (iii) attempt to modify, alter, tamper with or repair any of the Flock IP, or attempt to create any derivative product from any of the foregoing; (iv) interfere or attempt to interfere in any manner with the functionality or proper working of any of the Flock IP; (v) remove, obscure, or alter any notice of any intellectual property or proprietary right appearing on or contained within the Flock Services or Flock IP; (vi) use the Flock Services for anything other than the Permitted Purpose; or (vii) assign, sublicense, sell, resell, lease, rent, or
10.a
Packet Pg. 1584 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) otherwise transfer, convey, pledge as security, or otherwise encumber, Customer’s rights. There are no implied rights.
5.3 Disclosure of Footage. Subject to and during the Retention Period, Flock may access, use, preserve and/or disclose the Footage to law enforcement authorities, government officials, and/or third parties, if legally required to do so or if Flock has a good faith belief that such access, use, preservation or disclosure is reasonably necessary to comply with a legal process, enforce this Agreement, or detect, prevent or otherwise address security, privacy, fraud or technical issues, or emergency situations.
6. PAYMENT OF FEES
6.1 Billing and Payment of Fees. Customer shall pay the fees set forth in the applicable Order Form based on the billing structure and payment terms as indicated in the Order Form. If Customer believes that Flock has billed Customer incorrectly, Customer must contact Flock no later than thirty (30) days after the closing date on the first invoice in which the error or problem appeared to receive an adjustment or credit. Customer acknowledges and agrees that a failure to contact Flock within this period will serve as a waiver of any claim. If any undisputed fee is more than thirty (30) days overdue, Flock may, without limiting its other rights and remedies, suspend delivery of its service until such undisputed invoice is paid in full. Flock shall provide at least thirty (30) days’ prior written notice to Customer of the payment delinquency before exercising any suspension right.
6.2 Notice of Changes to Fees. Flock reserves the right to change the fees for subsequent Renewal Terms by providing sixty (60) days’ notice (which may be sent by email) prior to the end of the Initial Term or Renewal Term (as applicable).
6.3 Late Fees. If payment is not issued to Flock by the due date of the invoice, an interest penalty of 1.0% of any unpaid amount may be added for each month or fraction thereafter, until final payment is made.
6.4 Taxes. Customer is responsible for all taxes, levies, or duties, excluding only taxes based on Flock’s net income, imposed by taxing authorities associated with the order. If Flock has the legal obligation to pay or collect taxes, including amount subsequently assessed by a taxing authority, for which Customer is responsible, the appropriate amount shall be invoice to and paid by Customer unless Customer provides Flock a legally sufficient tax exemption certificate and
10.a
Packet Pg. 1585 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) Flock shall not charge customer any taxes from which it is exempt. If any deduction or withholding is required by law, Customer shall notify Flock and shall pay Flock any additional amounts necessary to ensure that the net amount that Flock receives, after any deduction and withholding, equals the amount Flock would have received if no deduction or withholding had been required.
7. TERM AND TERMINATION
7.1 Term. The initial term of this Agreement shall be for the period of time set forth on the Order Form (the “Term”). Following the Term, unless otherwise indicated on the Order Form, this Agreement will automatically renew for successive renewal terms of the greater of one year or the length set forth on the Order Form (each, a “Renewal Term”) unless either Party gives the other Party notice of non-renewal at least thirty (30) days prior to the end of the then-current term.
7.2 Termination. Upon termination or expiration of this Agreement, Flock will remove any applicable Flock Hardware at a commercially reasonable time period. In the event of any material breach of this Agreement, the non-breaching Party may terminate this Agreement prior to the end of the Term by giving thirty (30) days prior written notice to the breaching Party; provided, however, that this Agreement will not terminate if the breaching Party has cured the breach prior to the expiration of such thirty (30) day period (“Cure Period”). Either Party may terminate this Agreement (i) upon the institution by or against the other Party of insolvency, receivership or bankruptcy proceedings, (ii) upon the other Party's making an assignment for the benefit of creditors, or (iii) upon the other Party's dissolution or ceasing to do business. In the event of a material breach by Flock, and Flock is unable to cure within the Cure Period, Flock will refund Customer a pro-rata portion of the pre-paid fees for Services not received due to such termination.
7.3 Survival. The following Sections will survive termination: 1, 3, 5, 6, 7, 8.3, 8.4, 9, 11.1 and
11.6. 10.a
Packet Pg. 1586 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
8. REMEDY FOR DEFECT; WARRANTY AND DISCLAIMER
8.1 Manufacturer Defect. Upon a malfunction or failure of Flock Hardware or Embedded Software (a “Defect”), Customer must notify Flock’s technical support team. In the event of a Defect, Flock shall make a commercially reasonable attempt to repair or replace the defective Flock Hardware at no additional cost to the Customer. Flock reserves the right, in its sole discretion, to repair or replace such Defect, provided that Flock shall conduct inspection or testing within a commercially reasonable time, but no longer than seven (7) business days after Customer gives notice to Flock.
8.2 Replacements. In the event that Flock Hardware is lost, stolen, or damaged, Customer may request a replacement of Flock Hardware at a fee according to the reinstall fee schedule (https://www.flocksafety.com/reinstall-fee-schedule). In the event that Customer chooses not to replace lost, damaged, or stolen Flock Hardware, Customer understands and agrees that (1) Flock Services will be materially affected, and (2) that Flock shall have no liability to Customer regarding such affected Flock Services, nor shall Customer receive a refund for the lost, damaged, or stolen Flock Hardware.
8.3 Warranty. Flock shall use reasonable efforts consistent with prevailing industry standardsto maintain the Services in a manner which minimizes errors and interruptions in the Services and shall perform the Installation Services in a professional and workmanlike manner. Services may be temporarily unavailable for scheduled maintenance or for unscheduled emergency maintenance, either by Flock or by third-party providers, or because of other causes beyond Flock’s reasonable control, but Flock shall use reasonable efforts to provide advance notice in writing or by e-mail of any scheduled service disruption.
8.4 Disclaimer. THE REMEDY DESCRIBED IN SECTION 8.1 ABOVE IS CUSTOMER’S SOLE REMEDY, AND FLOCK’S SOLE LIABILITY, WITH RESPECT TO DEFECTS.
FLOCK DOES NOT WARRANT THAT THE SERVICES WILL BE UNINTERRUPTED OR ERROR FREE; NOR DOES IT MAKE ANY WARRANTY AS TO THE RESULTS THAT MAY BE OBTAINED FROM USE OF THE SERVICES. EXCEPT AS EXPRESSLY SET FORTH IN THIS SECTION, THE SERVICES ARE PROVIDED “AS IS” AND FLOCK
DISCLAIMS ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING, BUT NOT
LIMITED TO, IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A
10.a
Packet Pg. 1587 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) PARTICULAR PURPOSE AND NON-INFRINGEMENT. THIS DISCLAIMER ONLY
APPLIES TO THE EXTENT ALLOWED BY THE GOVERNING LAW OF THE STATE MENTIONED IN SECTION 11.6.
8.5 Insurance. Flock will maintain commercial general liability policies as stated in Exhibit B.
8.6 Force Majeure. Parties are not responsible or liable for any delays or failures in performance from any cause beyond their control, including, but not limited to acts of God, changes to law or regulations, embargoes, war, terrorist acts, pandemics (including the spread of variants), issues of national security, acts or omissions of third-party technology providers, riots, fires, earthquakes, floods, power blackouts, strikes, supply chain shortages of equipment or supplies, financial institution crisis, weather conditions or acts of hackers, internet service providers or any other third party acts or omissions.
9. LIMITATION OF LIABILITY; INDEMNITY
9.1 Limitation of Liability. NOTWITHSTANDING ANYTHING TO THE CONTRARY,
FLOCK, ITS OFFICERS, AFFILIATES, REPRESENTATIVES, CONTRACTORS AND
EMPLOYEES SHALL NOT BE RESPONSIBLE OR LIABLE WITH RESPECT TO ANY
SUBJECT MATTER OF THIS AGREEMENT OR TERMS AND CONDITIONS RELATED
THERETO UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY, PRODUCT LIABILITY, OR OTHER THEORY: (A) FOR LOSS OF REVENUE, BUSINESS OR BUSINESS INTERRUPTION; (B) INCOMPLETE, CORRUPT, OR INACCURATE DATA; (C) COST OF PROCUREMENT OF SUBSTITUTE GOODS, SERVICES OR TECHNOLOGY; (D) FOR ANY INDIRECT, EXEMPLARY, INCIDENTAL, SPECIAL OR CONSEQUENTIAL DAMAGES; (E) FOR ANY MATTER BEYOND FLOCK’S ACTUAL
KNOWLEDGE OR REASONABLE CONTROL INCLUDING REPEAT CRIMINAL ACTIVITY OR INABILITY TO CAPTURE FOOTAGE; OR (F) FOR ANY AMOUNTS
THAT, TOGETHER WITH AMOUNTS ASSOCIATED WITH ALL OTHER CLAIMS,
EXCEED THE FEES PAID AND/OR PAYABLE BY CUSTOMER TO FLOCK FOR THE SERVICES UNDER THIS AGREEMENT IN THE TWELVE (12) MONTHS PRIOR TO THE
ACT OR OMISSION THAT GAVE RISE TO THE LIABILITY, IN EACH CASE, WHETHER OR NOT FLOCK HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
THIS LIMITATION OF LIABILITY OF SECTION ONLY APPLIES TO THE EXTENT
10.a
Packet Pg. 1588 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
ALLOWED BY THE GOVERNING LAW OF THE STATE REFERENCED IN SECTION
11.6. NOTWITHSTANDING ANYTHING TO THE CONTRARY, THE FOREGOING
LIMITATIONS OF LIABILITY SHALL NOT APPLY (I) IN THE EVENT OF GROSS
NEGLIGENCE OR WILLFUL MISCONDUCT, OR (II) INDEMNIFICATION OBLIGATIONS.
9.2 Responsibility. Each Party to this Agreement shall assume the responsibility and liability for the acts and omissions of its own employees, officers, or agents, in connection with the performance of their official duties under this Agreement. Each Party to this Agreement shall be liable for the torts of its own officers, agents, or employees.
9.3 Flock Indemnity. Flock shall indemnify and hold harmless Customer, its agents and employees, from liability of any kind, including claims, costs (including defense) and expenses, on account of: (i) any copyrighted material, patented or unpatented invention, articles, device or appliance manufactured or used in the performance of this Agreement; or (ii) any damage or injury to property or person directly caused by Flock’s installation of Flock Hardware, except for where such damage or injury was caused solely by the negligence of the Customer or its agents, officers or employees. Flock’s performance of this indemnity obligation shall not exceed the fees paid and/or payable for the services rendered under this Agreement in the preceding twelve (12) months.
10. INSTALLATION SERVICES AND OBLIGATIONS
10.1 Ownership of Hardware. Flock Hardware is owned and shall remain the exclusive property of Flock. Title to any Flock Hardware shall not pass to Customer upon execution of this Agreement, except as otherwise specifically set forth in this Agreement. Except as otherwise expressly stated in this Agreement, Customer is not permitted to remove, reposition, re-install, tamper with, alter, adjust or otherwise take possession or control of Flock Hardware. Customer agrees and understands that in the event Customer is found to engage in any of the foregoing restricted actions, all warranties herein shall be null and void, and this Agreement shall be subject to immediate termination for material breach by Customer. Customer shall not perform any acts which would interfere with the retention of title of the Flock Hardware by Flock. Should Customer default on any payment of the Flock Services, Flock may remove Flock Hardware at Flock’s discretion. Such removal, if made by Flock, shall not be deemed a waiver of Flock’s
10.a
Packet Pg. 1589 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) rights to any damages Flock may sustain as a result of Customer’s default and Flock shall have the right to enforce any other legal remedy or right.
10.2 Deployment Plan. Flock shall advise Customer on the location and positioning of the Flock Hardware for optimal product functionality, as conditions and locations allow. Flock will collaborate with Customer to design the strategic geographic mapping of the location(s) and implementation of Flock Hardware to create a deployment plan (“Deployment Plan”). In the event that Flock determines that Flock Hardware will not achieve optimal functionality at a designated location, Flock shall have final discretion to veto a specific location, and will provide alternative options to Customer.
10.3 Changes to Deployment Plan. After installation of Flock Hardware, any subsequent requested changes to the Deployment Plan, including, but not limited to, relocating, repositioning, adjusting of the mounting, removing foliage, replacement, changes to heights of poles will incur a fee according to the reinstall fee schedule located at (https://www.flocksafety.com/reinstall-fee-schedule). Customer will receive prior notice and confirm approval of any such fees.
10.4 Customer Installation Obligations. Customer is responsible for any applicable supplementary cost as described in the Customer Implementation Guide, attached hereto as Exhibit C (“Customer Obligations”). Customer represents and warrants that it has, orshall lawfully obtain, all necessary right title and authority and hereby authorizes Flock to install the Flock Hardware at the designated locations and to make any necessary inspections or maintenance in connection with such installation.
10.5 Flock’s Obligations. Installation of any Flock Hardware shall be installed in a professional manner within a commercially reasonable time from the Effective Date of this Agreement. Upon removal of Flock Hardware, Flock shall restore the location to its original condition, ordinary wear and tear excepted. Flock will continue to monitor the performance of Flock Hardware for the length of the Term. Flock may use a subcontractor or third party to perform certain obligations under this agreement, provided that Flock’s use of such subcontractor or third party shall not release Flock from any duty or liability to fulfill Flock’s obligations under this Agreement.
11. MISCELLANEOUS
10.a
Packet Pg. 1590 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
11.1 Compliance With Laws. Parties shall comply with all applicable local, state and federal laws, regulations, policies and ordinances and their associated record retention schedules, including responding to any subpoena request(s).
11.2 Severability. If any provision of this Agreement is found to be unenforceable or invalid, that provision will be limited or eliminated to the minimum extent necessary so that this Agreement will otherwise remain in full force and effect.
11.3 Assignment. This Agreement is not assignable, transferable or sublicensable by either Party, without prior consent. Notwithstanding the foregoing, either Party may assign this Agreement, without the other Party's consent, (i) to any parent, subsidiary, or affiliate entity, or (ii) to any purchaser of all or substantially all of such Party's assets or to any successor by way of merger, consolidation or similar transaction.
11.4 Entire Agreement. This Agreement, together with the Order Form(s), the reinstall fee schedule (https://www.flocksafety.com/reinstall-fee-schedule), and any attached exhibits are the complete and exclusive statement of the mutual understanding of the Parties and supersedes and cancels all previous or contemporaneous negotiations, discussions or agreements, whether written and oral , communications and other understandings relating to the subject matter of this Agreement, and that all waivers and modifications must be in a writing signed by both Parties, except as otherwise provided herein. None of Customer’s purchase orders, authorizations or similar documents will alter the terms of this Agreement, and any such conflicting terms are expressly rejected. Any mutually agreed upon future purchase order is subject to these legal terms and does not alter the rights and obligations under this Agreement, except that future purchase orders may outline additional products, services, quantities and billing terms to be mutually accepted by Parties. In the event of any conflict of terms found in this Agreement or any other terms and conditions, the terms of this Agreement shall prevail. Customer agrees that Customer’s purchase is neither contingent upon the delivery of any future functionality or features nor dependent upon any oral or written comments made by Flock with respect to future functionality or feature.
11.5 Relationship. No agency, partnership, joint venture, or employment is created as a result of this Agreement and Parties do not have any authority of any kind to bind each other in any respect whatsoever. Flock shall at all times be and act as an independent contractor to Customer.
10.a
Packet Pg. 1591 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
11.6 Governing Law; Venue. This Agreement shall be governed by the laws of the state in which the Customer is located. The Parties hereto agree that venue would be proper in the chosen courts of the State of which the Customer is located. The Parties agree that the United Nations Convention for the International Sale of Goods is excluded in its entirety from this Agreement.
11.7 Special Terms. Flock may offer certain special terms which are indicated in the proposal and will become part of this Agreement, upon Customer’s prior written consent and the mutual execution by authorized representatives (“Special Terms”). To the extent that any terms of this Agreement are inconsistent or conflict with the Special Terms, the Special Terms shall control.
11.8 Publicity. Flock has the right to reference and use Customer’s name and trademarks and disclose the nature of the Services in business and development and marketing efforts.
11.9 Feedback. If Customer or Authorized End User provides any suggestions, ideas, enhancement requests, feedback, recommendations or other information relating to the subject matter hereunder, Agency or Authorized End User hereby assigns to Flock all right, title and interest (including intellectual property rights) with respect to or resulting from any of the foregoing.
11.10 Export. Customer may not remove or export from the United States or allow the export or re-export of the Flock IP or anything related thereto, or any direct product thereof in violation of any restrictions, laws or regulations of the United States Department of Commerce, the United States Department of Treasury Office of Foreign Assets Control, or any other United States or foreign Customer or authority. As defined in Federal Acquisition Regulation (“FAR”), section
2.101, the Services, the Flock Hardware and Documentation are “commercial items” and according to the Department of Defense Federal Acquisition Regulation (“DFAR”) section 252.2277014(a)(1) and are deemed to be “commercial computer software” and “commercial computer software documentation.” Flock is compliant with FAR Section 889 and does not contract or do business with, use any equipment, system, or service that uses the enumerated banned Chinese telecommunication companies, equipment or services as a substantial or essential component of any system, or as critical technology as part of any Flock system.
Consistent with DFAR section 227.7202 and FAR section 12.212, any use, modification, reproduction, release, performance, display, or disclosure of such commercial software or commercial software documentation by the U.S. Government will be governed solely by the
10.a
Packet Pg. 1592 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) terms of this Agreement and will be prohibited except to the extent expressly permitted by the terms of this Agreement.
11.11 Headings. The headings are merely for organization and should not be construed as adding meaning to the Agreement or interpreting the associated sections.
11.12 Authority. Each of the below signers of this Agreement represent that they understand this Agreement and have the authority to sign on behalf of and bind the Parties they are representing.
11.13 Conflict. In the event there is a conflict between this Agreement and any applicable statement of work, or Customer purchase order, this Agreement controls unless explicitlystated otherwise.
11.14 Morality. In the event Customer or its agents become the subject of an indictment, contempt, scandal, crime of moral turpitude or similar event that would negatively impact or tarnish Flock’s reputation, Flock shall have the option to terminate this Agreement upon prior written notice to Customer.
11.15 Notices. All notices under this Agreement will be in writing and will be deemed to have been duly given when received, if personally delivered; when receipt is electronically confirmed, if transmitted by email; the day after it is sent, if sent for next day delivery by recognized overnight delivery service; and upon receipt to the address listed on the Order Form (or, if different, below), if sent by certified or registered mail, return receipt requested.
11.16 Non-Appropriation. Notwithstanding any other provision of this Agreement, all obligations of the Customer under this Agreement which require the expenditure of funds are conditioned on the availability of funds appropriated for that purpose. Customer shall have the right to terminate this Agreement for non appropriation with thirty (30) days written notice without penalty or other cost.
10.a
Packet Pg. 1593 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
FLOCK NOTICES ADDRESS
:
1170 HOWELL MILL ROAD, NW SUITE 210
ATLANTA, GA 30318
ATTN: LEGAL DEPARTMENT
EMAIL: [email protected]
Customer NOTICES ADDRESS:
ADDRESS:
ATTN:
EMAIL:
10.a
Packet Pg. 1594 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion)
EXHIBIT B
INSURANCE
Required Coverage. Flock shall procure and maintain for the duration of this Agreement insurance against claims for injuries to persons or damages to property that may arise from or in connection with the performance of the services under this Agreement and the results of that work by Flock or its agents, representatives, employees or subcontractors. Insurance shall be placed with insurers with a current A. M. Best rating of no less than “A” and “VII”. Flock shall obtain and, during the term of this Agreement, shall maintain policies of professional liability (errors and omissions), automobile liability, and general liability insurance for insurable amounts of not less than the limits listed herein. The insurance policies shall provide that the policies shall remain in full force during the life of the Agreement. Flock shall procure and shall maintain during the life of this Agreement Worker's Compensation insurance as required by applicable State law for all Flock employees.
Types and Amounts Required. Flock shall maintain, at minimum, the following insurance coverage for the duration of this Agreement:
(i) Commercial General Liability insurance written on an occurrence basis with minimum limits of One Million Dollars ($1,000,000) per occurrence and Two Million Dollars ($2,000,000) in the aggregate for bodily injury, death, and property damage, including personal injury, contractual liability, independent contractors, broad-form property damage, and product and completed operations coverage;
(ii) Umbrella or Excess Liability insurance written on an occurrence basis with minimum limits of Ten Million Dollars ($10,000,000) per occurrence and Ten Million Dollars ($10,000,000) in the aggregate;
(iii) Professional Liability/Errors and Omissions insurance with minimum limits of Five Million Dollars ($5,000,000) per occurrence and Five Million Dollars ($5,000,000) in the aggregate;
(iv) Commercial Automobile Liability insurance with a minimum combined single limit of One Million Dollars ($1,000,000) per occurrence for bodily injury, death, and property coverage, including owned and non-owned and hired automobile coverage; and (v) Cyber Liability insurance written on an occurrence basis with minimum limits of Five Million Dollars ($5,000,000).
10.a
Packet Pg. 1595 Attachment: Flock Agreement (6360 : Flock Automated Licence Plate Recognition Camera Expansion) 04/2024/cdz/A24-0038/Reso
ALPR-FlockAgrment
RESOLUTION NO. 24-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EL
CENTRO AUTHORIZING THE EL CENTRO POLICE DEPARTMENT
TO ENTER INTO AN AGREEMENT WITH FLOCK GROUP INC.,
FOR THE INSTALLATION AND USE OF INTERSECTION
CAMERAS
WHEREAS, law enforcement agencies are charged with protecting the public as well as investigating crimes and criminal conduct; and
WHEREAS, law enforcement officers often search for vehicles that have been reported stolen, are suspected of being involved in criminal or terrorist activities and use information from such footage for crime analysis; and
WHEREAS, such cameras also provide video footage of accidents; and WHEREAS, the El Centro Police Department (ECPD) was awarded a Stonegarden grant which must be used specifically for such intersection cameras and the associated software provided by Flock on the terms and conditions set out in the agreement; and WHEREAS, the continued use of Flock hardware and its associated software technology serves to enhance the services and operations capabilities of the El Centro Police Department and therefore in in best interests of the City; and
WHEREAS, the City Council approves entering into an agreement with Flock to provide such hardware and software.
NOW, THEREFORE THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS;
1. That the foregoing is true, correct and adopted.
2. That the City Council hereby approves the agreement with Flock for the procurement, installation and services related to intersection cameras funded by the City’s Stonegarden grant.
3. That the City shall comply with all requirements and obligations specified in the accompanying Agreement.
4. That the funds utilized shall not be used to supplant expenditures controlled by this body.
10.b
Packet Pg. 1596 Attachment: Flock Resolution (6360 : Flock Automated Licence Plate Recognition Camera Expansion) 04/2024/cdz/A24-0038/Reso
ALPR-FlockAgrment
5. That the City Manager or designee is authorized to sign the Agreement in the form on file with the City Clerk and to take any and all other necessary action to implement the provisions of this Resolution.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro held on the day of , 2024.
CITY OF EL CENTRO
By ___________________________
Sylvia Marroquin, Mayor
ATTEST:
By _______________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
By _______________________________
Elizabeth Martyn, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the 7 th day of May, 2024, by the
following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By ___________________________
Norma Wyles, City Clerk
10.b
Packet Pg. 1597 Attachment: Flock Resolution (6360 : Flock Automated Licence Plate Recognition Camera Expansion) City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Finance
El Centro, CA 92243 Category: Resolution
Prepared By: Elizabeth Fuchen
SCHEDULED Department Head: Karla Chaparro
RESOLUTION (ID # 6363) DOC ID: 6363
Adopt Resolution to Initiate the Proceedings for the Levy and collection of Assessments for the Buena Vista Landscaping & Lighting District
CITY MANAGER’S RECOMMENDATION:
Adopt Resolution No. 24- , A RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EL CENTRO INITIATING PROCEEDINGS FOR THE LEVY AND COLLECTION OF
ASSESSMENTS FOR THE EL CENTRO BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT FOR FISCAL YEAR 2024-2025 AND ORDERING THE
PREPARATION OF AN ENGINEER'S REPORT IN CONNECTION THEREWITH FISCAL IMPACT:
Will be the first step in determining the coming year’s assessment for The District.
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal # 1 - Financial & Governance Stability & Sustainability DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
Yes
BACKGROUND:
On an annual basis the Buena Vista Landscape and Lighting District determines the levy and collection of assessments needed for the coming year. This is based on an Engineer’s Report for the District. Prior to holding a public meeting on this issue, the items noted in the Resolutions presented to you in this document must be processed CONCLUSION:
Staff recommends Adoption of Resolution No. 24- , A RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF EL CENTRO INITIATING PROCEEDINGS FOR THE
LEVY AND COLLECTION OF ASSESSMENTS FOR THE EL CENTRO BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT FOR FISCAL YEAR 2024-2025 AND
ORDERING THE PREPARATION OF AN ENGINEER'S REPORT IN CONNECTION
THEREWITH
ATTACHMENTS:
• Buena Vista LLD - Initiating Proceedings - Intent Meeting 05 07 24 (PDF) 11 Packet Pg. 1598
04/2024/cdz/A24-0065/Reso/InitiateProceedingsCollectionof AssessmentsBuenaVistaLLD
1 RESOLUTION NO. 24-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO INITIATING PROCEEDINGS FOR THE LEVY
AND COLLECTION OF ASSESSMENTS FOR THE EL
CENTRO BUENA VISTA LANDSCAPING AND LIGHTING
DISTRICT FOR FISCAL YEAR 2024-2025 AND ORDERING
THE PREPARATION OF AN ENGINEER’S REPORT IN
CONNECTION THEREWITH
WHEREAS, the City Council of the City of El Centro, California (the “City Council”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code of California beginning with Section 22500 (the “Act”), desires to levy and collect annual assessments for the Buena Vista Landscaping and Lighting District (the “District”) to pay for the operation, maintenance and servicing of the landscaping improvements and all appurtenant facilities related thereto. The Act provides for the levy of such assessments by the County on behalf of the City pursuant to Chapter 4, Article 2; and WHEREAS, the District and the associated assessments are in compliance with the provisions of California Constitution Article XIIID; and WHEREAS, the City Council has retained Willdan Financial Services as the engineer for the purpose of assisting with the annual levy of the District and to prepare and file an engineer’s report with the City Clerk in accordance with the Act.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS:
1. That the above recitals are true and correct.
2. That the City Council hereby proposes to levy and collect assessments against the lots and parcels of land within the District to pay for the costs and expenses of the improvements described in section 4 hereof for the fiscal year commencing July 1, 2024 and ending June 30, 2025, pursuant to the Landscaping and Lighting Act of 1972, being Part 2 of Division 15 of the Streets and Highways Code (the “Act”) and as provided by Article XII D of the California Constitution.
3. That the general location and boundaries of the District are shown on maps on file in the office of the City Clerk, are incorporated herein by reference, and open to public inspection.
4. That the proposed improvements may be briefly described as follows: the operation, maintenance and servicing of street lighting, turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, street lighting and associated appurtenant facilities located within the streetscape (and perimeter
11.a
Packet Pg. 1599 Attachment: Buena Vista LLD - Initiating Proceedings - Intent Meeting 05 07 24 (6363 : Adopt Resolution to Initiate the Proceedings for the Levy 04/2024/cdz/A24-0065/Reso/InitiateProceedingsCollectionof AssessmentsBuenaVistaLLD
2 landscaping) surrounding the developments. Maintenance means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of the street lighting, ornamental structures, landscaping and appurtenant facilities, including repair, removal or replacement of all or part of any of the street lighting, ornamental structures, landscaping or appurtenant facilities. Servicing means the furnishing of electricity for the street lighting and operation of the ornamental structures, landscaping, and appurtenant facilities, and water for the irrigation and control of the landscaping and the maintenance of any of the ornamental structures, landscaping, lighting and appurtenant facilities.
5. That the City Council hereby designates Willdan Financial Services as the Engineer for the purposes of these proceedings and orders the engineer to prepare and file with the City Clerk a written report in accordance with Article XIIID, Section 4 of the California Constitution and Article 4 (commencing with Section 22565) of Chapter 1 of the Act for Fiscal Year 2024-2025 commencing July 1, 2024 and ending June 30, 2025. Such report shall refer to the District by its distinctive designation.
6. That lots or parcels within the District that are owned or used by any county, city, city and county, special district or any other local or regional governmental entity, the State of California or the United States shall be assessed unless the City demonstrates by clear and convincing evidence that such lots or parcels receive no special benefit from the proposed improvements.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024.
CITY OF EL CENTRO
By_______________________________
Sylvia Marroquin, Mayor
ATTEST:
By _____________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
By __________________________________
Elizabeth L. Martyn, City Attorney
11.a
Packet Pg. 1600 Attachment: Buena Vista LLD - Initiating Proceedings - Intent Meeting 05 07 24 (6363 : Adopt Resolution to Initiate the Proceedings for the Levy 04/2024/cdz/A24-0065/Reso/InitiateProceedingsCollectionof AssessmentsBuenaVistaLLD
3 STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By ____________________________
Norma Wyles, City Clerk
11.a
Packet Pg. 1601 Attachment: Buena Vista LLD - Initiating Proceedings - Intent Meeting 05 07 24 (6363 : Adopt Resolution to Initiate the Proceedings for the Levy City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Finance
El Centro, CA 92243 Category: Resolution
Prepared By: Elizabeth Fuchen
SCHEDULED Department Head: Karla Chaparro
RESOLUTION (ID # 6362) DOC ID: 6362
Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena Vista Landscaping & Lighting District
CITY MANAGER’S RECOMMENDATION:
Adopt Resolution No. 24- , RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO FOR PRELIMINARY APPROVAL OF THE ENGINEER'S ANNUAL LEVY
REPORT REGARDING THE EL CENTRO BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT; AND THE LEVY AND COLLECTION OF ANNUAL ASSESSMENTS RELATED THERETO FOR FISCAL YEAR 2024-2025
FISCAL IMPACT:
Will be the first step in determining the coming year’s assessment for The District.
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal # 1 - Financial & Governance Stability & Sustainability DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
Yes
BACKGROUND:
On an annual basis the El Centro Buena Vista Landscape and Lighting District determines the levy and collection of assessments needed for the coming year. This is based on an Engineer’s Report for the District. Prior to holding a public meeting on this issue, the items noted in the Resolutions presented to you in this document must be processed
CONCLUSION:
Staff recommends adoption of Resolution No. 24- , RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF EL CENTRO, FOR PRELIMINARY APPROVAL OF THE
ENGINEER'S ANNUAL LEVY REPORT REGARDING THE EL CENTRO BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT; AND THE LEVY AND
COLLECTION OF ANNUAL ASSESSMENTS RELATED THERETO FOR FISCAL YEAR 2024-2025
12 Packet Pg. 1602
Resolution (ID # 6362) Meeting of May 7, 2024
ATTACHMENTS:
· Buena Vista LLD - Engineer's Report - Intent Meeting 05 07 24 (PDF) · Buena Vista LL&D (PDF)
12 Packet Pg. 1603
04/2024/cdz/A24-0065/Reso/ApprovalEngineersReport
BuenaVistaLLD 1
RESOLUTION NO. 24-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO FOR PRELIMINARY APPROVAL OF THE
ENGINEER’S ANNUAL LEVY REPORT REGARDING THE EL
CENTRO BUENA VISTA LANDSCAPING AND LIGHTING
DISTRICT AND THE LEVY AND COLLECTION OF ANNUAL
ASSESSMENTS RELATED THERETO FOR FISCAL YEAR
2024-2025
WHEREAS, the City Council of the City of El Centro, California (the “City Council”) has, by previous resolution, ordered the preparation of an engineer’s report (the “Report”) regarding the assessment district designated as the Buena Vista Landscaping and Lighting District (the “District”), and the levy and collection of assessments related thereto for Fiscal Year 2024-2025, pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code of California, beginning with Section 22500 (the “Act”); and WHEREAS, there has now been presented to this City Council the Report as required by Chapter 3, Section 22623 of the Act; and
WHEREAS, the City Council has carefully examined and reviewed the Report as presented and is preliminary satisfied with the District, the improvements described therein and each of the budget items and documents as set forth therein and is satisfied that the proposed annual assessments, on a preliminary basis, have been assigned in accordance with the special benefits received from the improvements, operation, administration, maintenance and services to be performed within the District, as set forth in the Report.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS:
1. That the above recitals are true and correct.
2. That the Report as presented consists of the following:
A description of improvements;
A diagram of the District;
The proposed annual budget for the fiscal year (costs and expenses); The method of apportionment that details the method of calculating each parcel’s proportional special benefits and annual assessment; and The District roll containing the levy for each assessor parcel number within the District commencing Fiscal Year 2024-2025.
12.a
Packet Pg. 1604 Attachment: Buena Vista LLD - Engineer's Report - Intent Meeting 05 07 24 (6362 : Adopt Resolution for Preliminary Approval of the Engineer's 04/2024/cdz/A24-0065/Reso/ApprovalEngineersReport
BuenaVistaLLD 2
3. That the District and the associated assessments as outlined in the Engineer’s Report are in compliance with the provisions of California Constitution Article XIIID.
4. That the Report is hereby approved on a preliminary basis, and ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.
5. That the City Clerk shall certify to the passage and adoption of this resolution, and the minutes of this meeting shall so reflect the presentation of the Report.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California held on the day of , 2024.
CITY OF EL CENTRO
By_____________________________
Sylvia Marroquin, Mayor
ATTEST:
By_____________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
Office of the City Attorney
By___________________________________
Elizabeth L. Martyn, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By___________________________
Norma Wyles, City Clerk
12.a
Packet Pg. 1605 Attachment: Buena Vista LLD - Engineer's Report - Intent Meeting 05 07 24 (6362 : Adopt Resolution for Preliminary Approval of the Engineer's
City of El Centro
Buena Vista
Landscape and Lighting District
2024/2025 ENGINEER’S REPORT
Intent Meeting: May 07, 2024
Public Hearing: May 21, 2024
27368 Via Industria, Suite 200
Temecula, California 92590
T. 951.587.3500 800.755.6864
F. 951.587.3510 888.326.6864
www.willdan.com
12.b
Packet Pg. 1606 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V)
ENGINEER'S REPORT AFFIDAVIT
Buena Vista Landscaping and Lighting District
The District includes the parcels of land within the residential and commercial subdivisions known as
Buena Vista
City of El Centro,
County of Imperial, State of California
This Report identifies the parcels within the Buena Vista Landscaping and Lighting District and relevant zones therein including the improvements, budgets, parcels and assessments to be levied for Fiscal Year 2024/2025, as they existed at the time of the passage of the Resolution of Intention. Reference is hereby made to the Imperial County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this ____________ day of ______________, 2024
Willdan Financial Services
Assessment Engineer
On Behalf of the City of El Centro
By: ________________________________
Michelle Laase
Project Manager, District Administration Services
By: ________________________________
Tyrone Peter
P.E. # C 81888
12.b
Packet Pg. 1607 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V)
PRELIMINARY APPROVAL
This Engineer’s Report and the proposed assessments described herein have been preliminarily approved by the City Council of the City of El Centro on this ______ day of ____________, 2024.
_________________________________
Norma Wyles, CMC
City Clerk
City of El Centro
FINAL APPROVAL
This Engineer’s Report, the improvements and assessments described herein were approved and adopted by the City Council of the City of El Centro on this ______ day of ___________, 2024.
________________________________
Norma Wyles, CMC
City Clerk
City of El Centro
12.b
Packet Pg. 1608 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V)
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY 1
A. INTRODUCTION 1
II. PLANS AND SPECIFICATIONS 2
A. DESCRIPTION OF THE DISTRICT 2
B. IMPROVEMENTS AUTHORIZED BY THE 1972 ACT 2
C. DESCRIPTION OF IMPROVEMENTS AND SERVICES 3
III. METHOD OF APPORTIONMENT 5
A. GENERAL 5
B. PROPOSITION 218 BENEFIT ANALYSIS 5
C. SPECIAL BENEFIT ANALYSIS 7
D. ASSESSMENT METHODOLOGY 8
E. ASSESSMENT RANGE FORMULA 11
IV. DISTRICT BUDGET 12
A. DESCRIPTION OF BUDGET ITEMS 12
B. PROPOSED BUDGET FISCAL YEAR 2024/2025 16
C. HISTORICAL RATES 17
V. DISTRICT DIAGRAM 18
VI. 2024/2025 ASSESSMENT ROLL 19
12.b
Packet Pg. 1609 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 1 of 19
I. EXECUTIVE SUMMARY
A. INTRODUCTION
The City of El Centro (“City”) created the Buena Vista Landscaping and Lighting District (“District”) in order to provide for the ongoing operation, maintenance and servicing of median landscaping, certain perimeter landscaping and street lighting improvements installed in connection with development of properties within the District. This District provides the financial mechanism (annual assessments) by which the ongoing operation, maintenance and servicing of these improvements are funded. The District was formed in 2004 and annual assessments are levied pursuant to the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (“1972 Act”) and in compliance with the substantive and procedural requirements of the “California State Constitution” Article XIIID (“Article XIIID”).
This Engineer’s Annual Levy Report (“Report”) describes the District and the proposed assessments for Fiscal Year 2024/2025. The annual budget for the maintenance and operation of the improvements is based on estimated expenses for the upcoming Fiscal Year. Parcels within the District are assessed proportionately for only those improvements and services that are a special benefit.
The District boundaries, improvements and services, method of apportionment and assessments described in this Report are based on current development and improvement plans including the estimated direct expenditures, incidental expenses and reserves associated with the maintenance and servicing of the improvements. These detailed plans and specifications approved by the City are made part of this Report by reference.
The word “parcel,” for the purposes of this Report, refers to an individual property assigned its own Assessment Number by the Imperial County (“County”) Assessor’s Office. The County Auditor/Controller uses Assessment Numbers and specific Fund Numbers to identify properties assessed on the tax roll for special district benefit assessments.
Following consideration of public comments and written protests at a noticed Public Hearing, the City Council may confirm the Report as submitted or amended and order the levy and collection of assessments for Fiscal Year 2024/2025 pursuant to the 1972 Act. The assessment information approved will be submitted to the County Auditor/Controller and included on the property tax roll for each benefiting parcel.
12.b
Packet Pg. 1610 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 2 of 19
II. PLANS AND SPECIFICATIONS
A. DESCRIPTION OF THE DISTRICT
The District consists of the lots, parcels and subdivisions of land located in the development area described below:
Buena Vista: The District encompasses the area of land identified by the County Assessor’s Office as Buena Vista Sub Units 1 through 4. It is located on the west side of 8th Street, between McCabe Road and Interstate 8. 465 single-family residential lots have been created within these Sub Units.
The District Diagram is presented in Part V of this Report.
B. IMPROVEMENTS AUTHORIZED BY THE 1972 ACT
As applicable or may be applicable to this District, the 1972 Act defines improvements to mean one or any combination of the following:
The installation or planting of landscaping.
The installation or construction of statuary, fountains and other ornamental structures and facilities.
The installation or construction of public lighting facilities. The installation or construction of any facilities which are appurtenant to any of the foregoing or which are necessary or convenient for the maintenance or servicing thereof, including, but not limited to, grading, clearing, removal of debris, the installation or construction of curbs, gutters, walls, sidewalks, or paving, or water, irrigation, drainage, or electrical facilities. The maintenance or servicing, or both, of any of the foregoing. The acquisition of any existing improvement otherwise authorized pursuant to this section.
Incidental expenses associated with the improvements including, but not limited to:
The cost of preparation of the Report, including plans, specifications, estimates, diagram, and assessment;
The costs of printing, advertising and the publishing, posting and mailing of notices;
Compensation payable to the County for collection of assessments;
12.b
Packet Pg. 1611 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 3 of 19
Compensation of any engineer or attorney employed to render services; Any other expenses incidental to the construction, installation, or maintenance and servicing of the improvements;
Any expenses incidental to the issuance of bonds or notes pursuant to Section 22662.5.
Costs associated with any elections held for the approval of a new or increased assessment.
The 1972 Act defines "maintain" or "maintenance" to mean furnishing of services and materials for the ordinary and usual maintenance, operation, and servicing of any improvement, including:
Repair, removal or replacement of all or any part of any improvement. Providing for the life, growth, health, and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, or treating for disease or injury.
The removal of trimmings, rubbish, debris, and other solid waste. The cleaning, sandblasting, and painting of walls and other improvements to remove or cover graffiti.
C. DESCRIPTION OF IMPROVEMENTS AND SERVICES
Landscape Improvements
The landscaping improvements may include, but are not limited to landscaping material and facilities within the District. These improvements include turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, and associated appurtenant facilities located within the streetscape (and perimeter landscaping) surrounding the developments, specifically:
Perimeter Landscaping at the locations and with the approximate composition, which follow. The square footage of area to be maintained for each development was estimated at a constant 5 feet width multiplied by a variable length of perimeter where the development adjoins a street. The length was taken from the Landscape Construction Plans measurement where available and approximated manually where the fore-mentioned measurements were not available.
8th Street and Imperial Avenue – 14,146.80 square feet of shrubs; 8
th Street and Imperial Avenue – 6,445.77 square feet of groundcover;
12.b
Packet Pg. 1612 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 4 of 19
8th Street, Imperial Avenue, Manuel A. Ortiz Avenue, and Fieldview Avenue – 225 trees.
Perimeter Hardscape at the following locations and compositions:
8th Street, Imperial Avenue, Manuel A. Ortiz Avenue, and Fieldview Avenue – 30,200 square feet of concrete sidewalk;
8th Street and Imperial Avenue – 2,910 linear feet of slump block wall; 8
th Street – 160 linear feet of entry monument; and
8
th Street – 13,620 square feet of decomposed granite.
The total perimeter landscape and hardscape area is estimated at approximately 88,523 square feet.
Retention Basin maintenance, including, but not limited to trash removal, weed clearing and other necessary maintenance to keep the basin operating properly.
Public Street Lighting Improvements
The street lighting improvements may include but are not limited to electrical energy, lighting fixtures, poles, meters, conduits, electrical cable and associated appurtenant facilities associated with:
Public street lighting within the residential subdivisions; Public street lighting, traffic signals and other public lighting facilities on the streets surrounding or adjacent to the developments and other public areas associated with or necessary for development of properties within the District.
12.b
Packet Pg. 1613 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 5 of 19
III. METHOD OF APPORTIONMENT
A. GENERAL
The 1972 Act permits the establishment of assessment districts by agencies for the purpose of providing certain public improvements, which include the construction, maintenance, and servicing of public lights, landscaping and appurtenant facilities. The 1972 Act further requires that the cost of these improvements be levied according to benefit rather than assessed value:
“The net amount to be assessed upon lands within an assessment district may be apportioned by any formula or method which fairly distributes the net amount among all assessable lots or parcels in proportion to the estimated benefits to be received by each such lot or parcel from the improvements.” Furthermore, Article XIIID Section 4 of the California Constitution (“Constitution”) states that:
“The proportionate special benefit derived by each identified parcel shall be determined in relationship to the entirety of the capital cost of the public improvement, the maintenance and operation expenses of the public improvement, or the cost of the property related service being provided...” The formula used for calculating assessments reflects the composition of the parcels, and the improvements and services provided, to fairly apportion the costs based on estimated benefit to each parcel.
B. PROPOSITION 218 BENEFIT ANALYSIS
The costs of the improvements have been identified and allocated to properties within the District based on special benefit. The improvements to be provided by this District and for which properties will be assessed have been identified as an essential component and local amenity that provides a direct reflection and extension of the properties within the District which the property owners and residents have expressed a high level of support.
This District was formed to provide and establish landscape and lighting enhancement that affects the presentation of the surrounding properties and developments and will directly benefit the parcels to be assessed within the District. The assessments and method of apportionment is based on the premise that the assessments will be used to construct and install landscape improvements within the existing Buena Vista Landscape and Lighting District as well as provide for the annual maintenance of those improvements, and the assessment revenues generated for the District will be used solely for such purposes.
12.b
Packet Pg. 1614 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 6 of 19
In conjunction with the provisions of the 1972 Act, the California Constitution Article XIIID addresses several key criteria for the levy of assessments, notably:
Article XIIID Section 2d defines District as follows:
“District means an area determined by an agency to contain all parcels which will receive a special benefit from a proposed public improvement or property-related service”;
Article XIIID Section 2i defines special benefit as follows:
“Special benefit” means a particular and distinct benefit over and above general benefits conferred on real property located in the district or to the public at large.
General enhancement of property value does not constitute “special benefit.” Article XIIID Section 4a defines proportional special benefit assessments as follows:
“An agency which proposes to levy an assessment shall identify all parcels which will have a special benefit conferred upon them and upon which an assessment will be imposed. The proportionate special benefit derived by each identified parcel shall be determined in relationship to the entirety of the capital cost of a public improvement, the maintenance and operation expenses of a public improvement, or the cost of the property related service being provided. No assessment shall be imposed on any parcel which exceeds the reasonable cost of the proportional special benefit conferred on that parcel.”
The method of apportionment (method of assessment) set forth in the Report is based on the premise that each assessed property receives special benefits from the landscape and lighting improvements in the District, and the assessment obligation for each parcel reflects that parcel’s proportional special benefits as compared to other properties that receive special benefits.
To identify and determine the proportional special benefit to each parcel within the District, it is necessary to consider the entire scope of the improvements provided as well as the properties that benefit from those improvements. The improvements and the associated costs described in this Report, have been carefully reviewed and have been identified and allocated based on a benefit rationale and calculations that proportionally allocate the net cost of only those improvements determined to be of special benefit to properties within the District. The various public improvements and the associated costs have been identified as either “general benefit” (not assessed) or “special benefit”.
12.b
Packet Pg. 1615 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 7 of 19
C. SPECIAL BENEFIT ANALYSIS
Each of the improvements, the associated costs and assessments have been carefully reviewed, identified and allocated based on special benefit pursuant to the provisions of the Constitution and the 1972 Act. The improvements associated with this District have been identified as necessary, required and/or desired for the orderly development of the properties within the District to their full potential, consistent with the proposed development plans. As such, these improvements would be necessary and required of individual property owners for the development of such properties and their ongoing operation; maintenance and servicing of these improvements would be the financial obligation of those properties. Therefore, the improvements and the annual costs of ensuring the operation, maintenance and servicing of the improvements are of direct and special benefit to the properties.
The method of apportionment (method of assessment) is based on the premise that each assessed parcel within the District receives benefit from the improvements. The desirability and security of properties is enhanced by the presence of street lighting and well-maintained landscaping in close proximity to those properties.
The special benefits associated with the landscaping improvements specifically:
Enhanced desirability of properties through association with the improvements;
Improved aesthetic appeal of properties providing a positive representation of the area and properties;
Enhanced adaptation of the urban environment within the natural environment from adequate green space and landscaping;
Environmental enhancement through improved erosion resistance, dust and debris control, and fire prevention;
Increased sense of pride in ownership of property within the District resulting from well-maintained improvements associated with the properties;
Enhanced quality of life through well-maintained green belts and landscaped areas;
Reduced criminal activity and property-related crimes (especially vandalism) against properties in the District through well-maintained surroundings and amenities including abatement of graffiti; and Enhanced environmental quality of the parcels by moderating temperatures, providing oxygenation and attenuating noise.
The special benefits of street lighting are the convenience, safety, and security of property, improvements, and goods. Specifically:
12.b
Packet Pg. 1616 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 8 of 19
Enhanced deterrence of crime and aid to police protection; Increased nighttime safety on roads and streets;
Improved ability of pedestrians and motorists to see; Improved ingress and egress to and from property;
Reduced vandalism and other criminal act and damage to improvements or property; and
Improved traffic circulation and reduced nighttime accidents and personal property loss.
The preceding special benefits contribute to a specific enhancement and desirability of each of the assessed parcels within the District.
Although the improvements include public easements, right-of-ways, streets and other amenities available or visible to the public at large, the construction and installation of these improvements are only necessary for the development of properties within the District and are not required nor necessarily desired by any properties or developments outside the District boundary. Therefore, any public access or use of the improvements by others is incidental and there is no measurable general benefit to properties outside the District or to the public at large.
D. ASSESSMENT METHODOLOGY
The method of apportionment for the District calculates the receipt of special benefit from the respective improvements based on the actual or proposed land use of the parcels within the District. The special benefit received by each lot or parcel is equated to the overall land use of the parcel based on the parcel’s actual land use or proposed planned development and is reliant upon the special benefit received from the improvements planned within the District. The development is a Single Family Residential development, and it has been determined that the planned residential parcels benefit equally from the improvements.
Equivalent Benefit Units:
To assess benefits equitably, it is necessary to relate each property’s proportional special benefits to the special benefits of other properties within the District. The Equivalent Benefit Unit method of assessment apportionment uses the singlefamily home site as the basic unit of assessment. A single-family home site equals one Equivalent Benefit Unit (EBU). The other land uses are converted to EBUs based on an assessment formula that equates the property’s specific development status, type of development (land use), and size of the property, as compared to a single-family home site.
12.b
Packet Pg. 1617 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 9 of 19
The EBU method of apportioning special benefits is typically seen as an appropriate and equitable assessment methodology for districts formed under the 1972 Act, as the benefit to each parcel from the improvements are apportioned as a function of land use type, size and development.
EBU Application by Land Use:
Single-Family Residential — This land use is defined as a fully subdivided residential home site with or without a structure. This land use is assessed 1.0 EBU per lot or parcel. This is the base value that the other land use types are compared to and weighted against (i.e. Equivalent Benefit Unit or EBU).
Multi-Family Residential — This land use is defined as a fully subdivided residential parcel that has more than one residential unit developed on the property. This land use is assessed 1.0 EBU per dwelling unit.
Planned-Residential Development — This land use is defined as any property not fully subdivided with a specific number of proposed residential lots or dwelling units to be developed on the parcel. This land use type is assessed at 1.0 EBU per planned (proposed) residential lot or dwelling unit.
Vacant Single-Family Residential — This land use is defined as property currently zoned for single-family detached residential development, but a tentative or final tract map has not been submitted and/or approved. This land use is assessed at 0.5 EBU per parcel.
Vacant Multi-Family Residential — This land use is defined as property currently zoned for multi-family residential development, but a tentative or final tract map has not been submitted and/or approved. This land use is assessed at 0.5 EBU per parcel.
Vacant Commercial — This land use is defined as property currently zoned for commercial use, but not specifically identified as commercial property. This land use is assessed at 1.0 EBU per acre. Parcels less than 1 acre are assigned a minimum of 1.0 EBU. Parcels over 50 acres are assigned a maximum of 50 EBU.
Developed Commercial — This land use is defined as property developed for either commercial or industrial use. This land use type is assessed at 4.0 EBU per gross acre. Parcels less than 0.25 acres are assigned a minimum of 1.0 EBU and there is no maximum acreage cap, as is the case with Vacant Commercial Property.
Recreational or Limited Commercial Use — This land use is defined as property used for recreational or commercial use that is not part of the improvements provided by the District. This land use classification may include, but is not limited to, golf courses, commercial parking lots or commercial properties where less than ten percent of the total acreage has been developed. This land use is assessed at
2.0 EBU per acre. Similar to Commercial properties, there is no maximum acreage cap for this land use, but parcels less than 0.5 acres are assigned a minimum 1.0 EBU.
12.b
Packet Pg. 1618 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 10 of 19
Exempt Parcels — This land use identifies properties that are not assessed and are assigned 0.0 EBU. This land use classification may include, but is not limited, to lots or parcels identified as public streets and other roadways (typically not assigned an APN by the County); dedicated public easements, open space areas and right-of-ways including greenbelts and parkways; utility right-of-ways; common areas, sliver parcels and bifurcated lots or any other property that cannot be developed; park properties and other publicly owned properties that are part of the District improvements or that have little or no improvement value. These types of parcels are considered to receive little or no benefit from the improvements and are therefore not assessed.
The following table provides a listing of land use types, land use code designations, the Equivalent Benefit Unit factor applied to that land use type, and the multiplying factor used to calculate each parcel’s individual EBU.
Land Use Codes and Equivalent Benefit Units
Property Type
Land Use
Code
Equivalent
Benefit Unit Multiplier
Single-Family Residential SFR 1.0 Lot/Parcel
Multi-Family Residential MFR 1.0 Dwelling Unit
Planned Residential Development PRD 1.0 Planned Residential Lot or Dwelling Unit
Vacant Single-Family Residential SFV 0.5 Parcel
Vacant Multi-Family Residential MFV 0.5 Parcel
Vacant Commercial CMV 1.0 Acreage
Developed Commercial COM 4.0 Acreage
Recreational or Limited Commercial Use REC 2.0 Acreage
Exempt XMT 0.0 Parcel
The benefit formula applied to parcels within the District is based on the preceding Equivalent Benefit Unit (EBU) table. Each parcel's EBU correlates the parcel’s special benefit received as compared to the other parcels benefiting from the improvements.
The following formula is used to calculate each parcel’s EBU (proportional benefit).
Parcel Type EBU x Acres/Dwelling Units/Parcel/Lot = Parcel EBU The total number of Equivalent Benefit Units (EBUs) is the sum of individual EBUs applied to parcels that receive special benefit from the improvements. An assessment amount per EBU (“Rate”) is established by taking the net total cost of the improvements and dividing that amount by the total number of EBUs of the parcels benefiting from the improvements. This Rate is then applied back to each parcel’s individual EBU to determine the parcel’s proportionate benefit and assessment obligation for that improvement.
12.b
Packet Pg. 1619 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 11 of 19
Total Balance to Levy / Total EBU = Rate per EBU
Rate per EBU x Parcel EBU = Parcel Levy Amount
The total number of EBUs for the developments within the District is 465.
E. ASSESSMENT RANGE FORMULA
Any new or increased assessment requires certain noticing and meeting requirements by law. Prior to the passage of Proposition 218 (California Constitution Articles XIIIC and XIIID), legislative changes in the Brown Act defined a "new or increased assessment" to exclude certain conditions. These conditions included "any assessment that does not exceed an assessment formula or range of assessments previously adopted by the agency or approved by the voters in the area where the assessment is imposed." This definition and conditions were later confirmed through Senate Bill 919 (Proposition 218 implementing legislation).
The purpose of establishing an assessment range formula is to provide for reasonable increases and inflationary adjustment to annual assessments without requiring costly noticing and mailing procedures, which could add to the District costs and assessments. As part of the District formation, balloting of property owners was conducted pursuant to the Constitution Article XIIID Section 4. The property owner ballots included an Assessment to be approved, as well as the approval of an assessment range formula.
The Maximum Assessment Rate is equal to the initial Assessment Rate approved by property owners adjusted annually by the percentage increase of the Local Consumer Price Index (CPI) for San Diego-Carlsbad, CA Area for All Urban Consumers from January to January. For Fiscal Year 2024/2025, the percentage increase of the local CPI is 3.80%.
Beginning in the second Fiscal Year of the District (Fiscal Year 2005/06) and each Fiscal Year thereafter, the Maximum Assessment Rate will be recalculated and a new Maximum Assessment Rate established. The Maximum Assessment Rate is adjusted annually and is calculated independent of the District’s annual budget and proposed annual assessment. Any proposed annual assessment rate per EBU for any Fiscal Year that is less than or equal to this Maximum Assessment Rate is not considered an increased assessment.
12.b
Packet Pg. 1620 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 12 of 19
IV. DISTRICT BUDGET
A. DESCRIPTION OF BUDGET ITEMS
The following is a brief description of the costs associated with the improvements and services funded through the District.
DIRECT COSTS:
Maintenance Costs/Labor — Includes all regularly scheduled labor and general maintenance cost including all wages, salaries, benefits and contract services required to properly maintain and ensure the satisfactory condition of all improvements and appurtenant facilities.
Landscaping Supplies — Includes all, materials, supplies, (e.g. pipe, fertilizer, insecticides, fuel, cleaning material etc.), and equipment, (e.g. communication, small tools, rentals, machinery etc.), required to operate, maintain and ensure the satisfactory condition of all improvements and appurtenant facilities.
Utilities — The furnishing of water and electricity required for the operation and maintenance of the improvements and facilities.
Miscellaneous Expenses — This item includes repairs to the improvements and facilities that are not included in the yearly maintenance costs. This may include repair of damaged amenities due to vandalism, storms, etc. Also included may be planned upgrades or replacements of the improvements and equipment that provide a direct benefit to the District.
ADMINISTRATION COSTS:
District Administration — May include all or a portion of the administrative and professional service costs associated with the coordination of District services and operations including response to public concerns and education and procedures associated with the levy and collection of assessments. This budget item also includes the costs of contracting with professionals to provide administrative, legal or engineering services specific to the District.
County Per Parcel Fee — This is the cost to the District for the County to collect assessments on the property tax bills.
LEVY BREAKDOWN:
Reserve Collection/ (Transfer) — The 1972 Act pursuant to Chapter 1, Article 4 Section 22569 (a), provides for a District Reserve Fund. This Reserve Fund provides for the collection of funds to operate the District from the time period of July 1 (beginning of the Fiscal Year) through December 10th or when the County provides the City with the first installment of
12.b
Packet Pg. 1621 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 13 of 19
assessments collected from the property tax bills (typically January or February). Negative amounts shown for this budget item represent transfers from the Reserve Fund that reduces the Balance to Levy. Maintaining a fully funded Reserve eliminates the need for the City to transfer funds from nonDistrict accounts to pay for operational expenses during the first half of the fiscal year and also provides the District with sufficient funds to address any unforeseen or unusual expenditures that may occur during the year.
Capital Improvement Fund Collection/( Transfer) – The 1972 Act pursuant to Chapter 5, beginning with Section 22660, provides for the District to establish by resolution an assessment installment plan for proposed improvements and expenditures that are greater than can be conveniently raised from a single annual assessment. Depending on the nature of the planned improvements, the collection of funds necessary to complete the project may be collected over a period up to thirty years, but typically not more than five years. The funds collected shall be accumulated in a separate improvement fund commonly referred to as a Capital Improvement Fund (CIF) and are not considered part of the regular maintenance of the improvements or the Reserve Fund.
Because the money accumulated in the Capital Improvement Fund is for a specific planned project (budgeted separately), the amount shown for this item in the annual budget will typically be a positive number representing the amount being collected that year as part of the Balance to Levy. A negative number (Contribution) should only occur after the project has been completed and excess funds are being credited back to the District’s regular accounts. The actual fund balances and expenditures for Capital Improvements are clearly identified under the Fund Balance Information section of the Budget.
General Fund Loans Repayment/(Advances) — This item represents repayments of amounts that had been temporarily advanced to the District from other revenue sources (usually the General Fund) or represents funds being loaned to the District for the current Fiscal Year that must be repaid by future assessments. Similar to the Reserve Collection/ (Contribution) line item, this item directly impacts the Reserve Fund Balances either positively or negatively.
Repayments are shown as a positive number and represent additional money being collected in the current annual assessment to repay a prior loan. These loans are typically for capital improvement expenditures or unforeseen expenditures incurred in prior years and Reserve Fund monies were not sufficient to cover the expenses. To ensure the ongoing operation and maintenance of the improvements, the City may advance funds to the District as a temporary loan to meet current expenditures and collect repayment of the loan through the annual assessments the following year or possibly over several years. Generally, all available Reserve Funds are
12.b
Packet Pg. 1622 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 14 of 19
exhausted before a temporary loan is advanced to the District and the Beginning Reserve Fund Balance will be a negative number indicating the loan amount is still outstanding. A loan for the current fiscal year (Contribution) is shown as a negative number. If the District is expected to incur significant expenditures in the current fiscal year for special services or capital improvements (upgrades or refurbishing of the improvements) and the proposed assessment revenues (annual assessments) and/or available Reserve Funds are not sufficient to cover the expenditures, the City may advance funds to the District as a temporary loan to meet the proposed expenditures. Generally, all available Reserve Funds must be exhausted before a temporary loan is advanced to the District and any funds temporarily loaned in excess of the available Reserve Funds will be reflected as a negative Ending Reserve Fund Balance. This negative Reserve Fund Balance will be repaid and replenished through future assessment revenues.
Balance to Levy — This is the total amount to be levied and collected through assessments for the current fiscal year. The Balance to Levy represents the sum of Total Direct and Administration Costs, the Reserve Collection/ (Contribution), Replenishment/ (Contribution), and Other Revenue Sources.
DISTRICT STATISTICS:
Total Parcels — The total number of parcels within the District.
Total Parcels Levied — The total number of parcels within the District that are assessed. Non-assessable lots or parcels include properties that have been determined to receive no special benefits from the improvements and may include land principally encumbered by public or other right-of-ways or easements, common areas, and/or parcels that have restricted use or development potential.
Total Equivalent Benefit Units — The typical single-family residential parcel is assigned one (1.0) Equivalent Benefit Unit. Every other land-use or property type is converted to EBU’s based on an assessment formula that equates the property’s specific development status, type of development (land-use), and size of the property, as compared to typical single-family residential parcel.
Applied Levy per EBU — This amount represents the assessment rate being applied to each parcel. The Levy per EBU is the result of dividing the total Balance to Levy, by the sum of the Total Equivalent Benefit Units to be assessed.
12.b
Packet Pg. 1623 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 15 of 19
RESERVE INFORMATION:
Reserve Balance — The Reserve Balance eliminates the need for the City to transfer funds from non-District accounts to pay for District charges during the first half of the fiscal year. The Reserve Balance allows the District to retain sufficient funds to operate the District from the time period of July 1 (beginning of the Fiscal Year) through January or February (when the County provides the City with the first installment of assessments collected from the property tax bills). Additional funds may be collected each year to ensure adequate operating funds are available or the funds may be used to reduce the Balance to Levy. Using reserve amounts in this way allows the Levy rate to remain fairly constant, although District costs may fluctuate. The Previous Reserve Balance reflects the projected funds available at the beginning of the current fiscal year (based on the projected revenues and expenses from the prior fiscal year). The Estimated Ending Reserve Balance reflects the projected funds that are anticipated at the end of the current fiscal year (assuming all revenues and expenditures occur as budgeted).
The budget to establish the proposed maximum assessment and the proposed assessment for fiscal year 2024/2025 is shown on the next page. As shown in the budget, the adjusted Maximum Assessment Rate per EBU is $209.33. For each fiscal year, the actual proposed assessment may be less than the adjusted maximum assessment.
12.b
Packet Pg. 1624 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 16 of 19
B. PROPOSED BUDGET FISCAL YEAR 2024/2025
$25,000
50,000
9,000
2,000
900
$86,900
$86,900
$3,500
5,000
$8,500
$95,400
($87,047)
Interest Credit (1,800)
60,500
0 0
($28,347)
$67,053
467
465
465.00
$144.20
$144.20
$201.67
$209.33
3.80%
$94,721
(87,047)
$7,674
Total Parcels
Total Parcels Levied
Beginning Projected Reserve Balance 07/01/2024
Applied Levy per Benefit Unit
Total Equivalent Benefit Units
Proposed Levy per Benefit Unit
Ending Projected Reserve Balance 06/30/2025
Maximum Levy per Benefit Unit (Prior Fiscal Year)
Maximum Levy per Benefit Unit (Current Fiscal Year)
Inflationary Factor Applied to Maximum Rate
RESERVE INFORMATION
Collection/(Transfer)
District Administration
Professional Fees for Administration
TOTAL ADMIN
General Fund Loans Repayment/(Advances)
Other Revenues/General Fund (Contributions)
TOTAL ADJUSTMENTS
Capital Improvement Fund Collection/(Transfer)
TOTAL DIRECT AND ADMIN COSTS
Reserve Fund Reserve Collection/ (Transfer)
Balance to Levy (Budgeted)
TOTAL DIRECT
Sub-Total Direct Costs
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Fiscal Year 2024/25
Fund Number: 923
Levy Components Special Benefit
Maintenance Costs/Labor
Landscaping Supplies
Utilities Water
Utilities Electricity
Miscellaneous Expenses
12.b
Packet Pg. 1625 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 17 of 19
C. HISTORICAL RATES
Fiscal Year CPI Applied Rate Max Rate
2004/05 N/A $119.00 $119.00
2005/06 3.65% $123.34 $123.35
2006/07 3.67% $127.86 $127.87
2007/08 3.40% $66.10 $132.22
2008/09 2.29% $68.49 $135.24
2009/10 3.85% $71.40 $140.45
2010/11 0.00% $71.40 $140.45
2011/12 1.32% $71.40 $142.31
2012/13 3.03% $71.40 $146.62
2013/14 1.60% $10.00 $148.97
2014/15 1.31% $10.00 $150.92
2015/16 1.85% $10.00 $153.72
2016/17 1.62% $10.00 $156.20
2017/18 1.96% $10.00 $159.27
2018/19 3.01% $10.00 $164.07
2019/20 2.58% $10.00 $168.28
2020/21 2.30% $10.00 $172.15
2021/22 1.69% $46.14 $175.06
2022/23 8.22% $92.28 $189.46
2023/24 6.45% $115.36 $201.67
2024/25 3.80% $144.20 $209.33
12.b
Packet Pg. 1626 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 18 of 19
V. DISTRICT DIAGRAM
The Diagram for the Buena Vista Landscaping and Lighting District is on file with the City Clerk and by reference herein is made part of this Report. The parcels within the Buena Vista Landscaping and Lighting District consist of the lots, parcels and subdivisions of land shown on the Imperial Assessor’s parcel maps. The lines and dimensions shown on the County Assessor Parcel maps for the current year are incorporated by reference herein and made part of this Report.
12.b
Packet Pg. 1627 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) 2024/2025 Buena Vista LLD Page 19 of 19
VI. 2024/2025 ASSESSMENT ROLL
Parcel identification for each lot or parcel within the District shall be the parcel as shown on the Imperial County Secured Roll for the year in which this Report is prepared and reflective of the Assessor’s Parcel Maps. A listing of the current assessor parcels to be assessed within this District along with the assessment amounts is provided in the Assessment Roll on file at the Office of the City Clerk.
12.b
Packet Pg. 1628 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
054-551-001-000 802 MANUEL ORTIZ AVE SFR 1.00 $209.33 $144.20 054-551-002-000 826 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-003-000 850 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-004-000 874 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-005-000 898 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-006-000 902 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-007-000 926 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-008-000 950 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-009-000 974 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-010-000 998 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-011-000 1002 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-012-000 1026 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-013-000 1050 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-014-000 1074 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-015-000 1098 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-016-000 1102 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-017-000 1122 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-018-000 1140 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-019-000 1160 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-020-000 1178 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-021-000 1198 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-022-000 1202 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-023-000 1216 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-024-000 1230 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-551-025-000 1244 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-026-000 1258 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-027-000 1272 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-028-000 1286 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-029-000 1298 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-030-000 1302 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-031-000 1318 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-032-000 1334 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-033-000 1350 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-034-000 1364 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-035-000 1382 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-036-000 1398 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-037-000 1402 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-038-000 1416 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-039-000 1430 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-040-000 1444 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-041-000 1458 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-042-000 1472 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-551-043-000 1486 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-551-044-000 1498 MANUEL A. ORTIZ AVE SFR 1.00 209.33 144.20 054-552-001-000 1219 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-002-000 1203 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-003-000 1202 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-004-000 1218 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-005-000 1399 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-006-000 1383 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-007-000 1365 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-008-000 1351 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-009-000 1335 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-010-000 1319 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-011-000 1303 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-012-000 1299 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
Willdan Financial Services Page 1 of 9
12.b
Packet Pg. 1629 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-552-013-000 1283 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-014-000 1265 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-015-000 1251 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-016-000 1235 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-552-017-000 1234 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-018-000 1250 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-019-000 1264 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-020-000 1282 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-021-000 1298 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-022-000 1302 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-023-000 1318 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-024-000 1334 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-025-000 1350 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-026-000 1364 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-027-000 1382 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-552-028-000 1398 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-001-000 1219 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-002-000 1203 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-003-000 1202 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-004-000 1222 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-005-000 1240 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-006-000 1260 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-007-000 1278 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-008-000 1298 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-009-000 1299 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-010-000 1279 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-011-000 1261 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-012-000 1241 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-013-000 1223 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-014-000 1203 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-553-015-000 1218 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-016-000 1202 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-017-000 1235 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-018-000 1251 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-019-000 1265 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-020-000 1283 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-021-000 1299 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-022-000 1303 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-023-000 1319 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-024-000 1335 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-025-000 1351 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-026-000 1365 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-027-000 1383 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-028-000 1399 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-553-029-000 1398 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-030-000 1378 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-031-000 1360 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-032-000 1340 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-033-000 1322 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-034-000 1302 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-035-000 1303 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-036-000 1323 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-037-000 1341 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-038-000 1361 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-039-000 1379 FIELDVIEW CT SFR 1.00 209.33 144.20 054-553-040-000 1399 FIELDVIEW CT SFR 1.00 209.33 144.20 Willdan Financial Services Page 2 of 9
12.b
Packet Pg. 1630 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-553-041-000 1398 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-042-000 1382 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-043-000 1364 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-044-000 1350 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-045-000 1334 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-046-000 1318 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-047-000 1302 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-048-000 1298 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-049-000 1282 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-050-000 1264 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-051-000 1250 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-553-052-000 1234 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-001-000 1219 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-002-000 1203 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-003-000 1235 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-004-000 1251 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-005-000 1265 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-006-000 1283 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-007-000 1299 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-008-000 1303 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-009-000 1319 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-010-000 1335 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-011-000 1351 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-012-000 1365 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-013-000 1383 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-554-014-000 1399 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-555-001-000 1051 MANUEL A ORTIZ AVE SFR 1.00 209.33 144.20 054-555-002-000 1075 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-003-000 1099 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-004-000 1103 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-005-000 1123 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-006-000 1141 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-007-000 1161 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-008-000 1199 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-555-009-000 1198 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-010-000 1186 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-011-000 1172 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-012-000 1158 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-013-000 1144 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-014-000 1130 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-015-000 1116 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-016-000 1102 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-017-000 1103 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-018-000 1117 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-019-000 1131 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-020-000 1145 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-021-000 1159 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-022-000 1173 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-023-000 1187 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-024-000 1199 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-555-025-000 1198 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-555-026-000 1178 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-555-027-000 1160 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-555-028-000 1140 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-555-029-000 1122 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-555-030-000 1102 FIELDVIEW AVE SFR 1.00 209.33 144.20 Willdan Financial Services Page 3 of 9
12.b
Packet Pg. 1631 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-555-031-000 1098 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-555-032-000 1078 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-001-000 1199 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-002-000 1179 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-003-000 1161 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-004-000 1141 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-005-000 1123 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-006-000 1103 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-007-000 1099 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-008-000 1079 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-009-000 1061 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-010-000 1041 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-011-000 1023 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-012-000 1003 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-556-013-000 1002 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-014-000 1022 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-015-000 1040 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-016-000 1060 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-017-000 1078 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-018-000 1098 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-019-000 1102 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-020-000 1122 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-021-000 1140 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-022-000 1160 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-023-000 1178 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-556-024-000 1198 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-001-000 1199 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-002-000 1179 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-003-000 1161 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-004-000 1141 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-005-000 1123 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-006-000 1103 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-007-000 1099 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-008-000 1079 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-009-000 1061 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-010-000 1041 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-011-000 1023 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-557-012-000 1003 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-001-000 803 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-002-000 835 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-003-000 867 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-004-000 899 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-005-000 903 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-006-000 957 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-007-000 999 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-558-008-000 998 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-009-000 956 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-010-000 902 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-011-000 898 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-012-000 856 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-013-000 802 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-014-000 803 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-015-000 857 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-016-000 899 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-017-000 903 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-558-018-000 957 MEADOWVIEW AVE SFR 1.00 209.33 144.20 Willdan Financial Services Page 4 of 9
12.b
Packet Pg. 1632 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-558-019-000 999 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-001-000 1499 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-559-002-000 1479 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-559-003-000 1461 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-559-004-000 1441 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-559-005-000 1433 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-559-006-000 1403 MANUEL ORTIZ AVE SFR 1.00 209.33 144.20 054-559-007-000 1402 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-008-000 1426 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-009-000 1450 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-010-000 1474 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-011-000 1498 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-012-000 1499 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-013-000 1475 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-014-000 1451 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-015-000 1427 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-016-000 1403 RIVERVIEW AVE SFR 1.00 209.33 144.20 054-559-017-000 1402 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-018-000 1426 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-019-000 1450 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-020-000 1474 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-021-000 1498 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-022-000 1499 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-023-000 1475 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-024-000 1451 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-025-000 1427 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-026-000 1403 FIELDVIEW AVE SFR 1.00 209.33 144.20 054-559-027-000 1402 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-028-000 1426 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-029-000 1450 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-030-000 1474 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-031-000 1498 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-032-000 1499 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-033-000 1473 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-034-000 1451 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-035-000 1427 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-559-036-000 1403 MEADOWVIEW AVE SFR 1.00 209.33 144.20 054-561-001-000 1498 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-561-002-000 1478 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-561-003-000 1462 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-561-004-000 1442 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-561-005-000 1422 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-561-006-000 1402 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-001-000 1398 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-002-000 1382 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-003-000 1364 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-004-000 1350 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-005-000 1334 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-006-000 1318 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-007-000 1302 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-008-000 1298 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-009-000 1282 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-010-000 1264 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-011-000 1250 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-012-000 1234 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-562-013-000 1218 VALLEYVIEW AVE SFR 1.00 209.33 144.20 Willdan Financial Services Page 5 of 9
12.b
Packet Pg. 1633 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-562-014-000 1202 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-001-000 1198 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-002-000 1178 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-003-000 1160 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-004-000 1140 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-005-000 1122 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-006-000 1102 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-007-000 1098 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-008-000 1078 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-009-000 1060 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-010-000 1040 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-011-000 1022 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-563-012-000 1002 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-001-000 998 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-002-000 956 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-003-000 902 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-004-000 898 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-005-000 866 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-006-000 834 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-564-007-000 802 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-001-000 1199 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-002-000 1179 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-003-000 1161 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-004-000 1141 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-005-000 1123 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-006-000 1103 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-007-000 1099 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-008-000 1079 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-009-000 1061 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-010-000 1041 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-011-000 1023 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-012-000 1003 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-565-013-000 1002 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-014-000 1022 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-015-000 1040 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-016-000 1060 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-017-000 1078 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-018-000 1098 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-019-000 2256 S MARINA DR SFR 1.00 209.33 144.20 054-565-020-000 1122 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-021-000 1140 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-022-000 1160 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-023-000 1178 SKYVIEW AVE SFR 1.00 209.33 144.20 054-565-024-000 1198 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-001-000 1199 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-002-000 1179 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-003-000 1161 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-004-000 1141 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-005-000 1123 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-006-000 1103 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-007-000 1099 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-008-000 1079 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-009-000 1061 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-010-000 1041 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-011-000 1023 SKYVIEW AVE SFR 1.00 209.33 144.20 054-566-012-000 1003 SKYVIEW AVE SFR 1.00 209.33 144.20 Willdan Financial Services Page 6 of 9
12.b
Packet Pg. 1634 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-567-001-000 999 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-002-000 957 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-003-000 903 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-004-000 899 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-005-000 867 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-006-000 835 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-007-000 803 VALLEYVIEW AVE SFR 1.00 209.33 144.20 054-567-008-000 998 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-009-000 956 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-010-000 902 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-011-000 898 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-012-000 856 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-013-000 802 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-014-000 803 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-015-000 857 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-016-000 899 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-017-000 903 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-018-000 957 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-019-000 999 SKYVIEW AVE SFR 1.00 209.33 144.20
054-567-020-000 998 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-021-000 936 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-022-000 902 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-023-000 898 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-024-000 856 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-025-000 802 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-026-000 803 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-027-000 857 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-028-000 897 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-029-000 903 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-030-000 957 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-567-031-000 999 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-001-000 1198 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-002-000 1178 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-003-000 1160 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-004-000 1140 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-005-000 1122 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-006-000 1102 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-007-000 1098 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-008-000 1078 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-009-000 1060 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-010-000 1040 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-011-000 1022 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-591-012-000 1002 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-001-000 1199 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-002-000 1179 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-003-000 1161 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-004-000 1141 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-005-000 1123 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-006-000 1103 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-007-000 1099 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-008-000 1079 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-009-000 1061 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-010-000 1041 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-011-000 1023 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-012-000 1003 MOUNTAINVIEW AVE SFR 1.00 209.33 144.20 054-592-013-000 1002 DESERTVIEW AVE SFR 1.00 209.33 144.20 Willdan Financial Services Page 7 of 9
12.b
Packet Pg. 1635 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
054-592-014-000 1022 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-015-000 1040 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-016-000 1060 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-017-000 1078 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-018-000 1098 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-019-000 1102 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-020-000 1122 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-021-000 1140 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-022-000 1160 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-023-000 1178 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-592-024-000 1198 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-001-000 998 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-002-000 956 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-003-000 902 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-004-000 898 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-005-000 856 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-006-000 802 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-007-000 803 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-008-000 857 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-009-000 899 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-010-000 903 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-011-000 957 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-012-000 999 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-593-013-000 998 PALMVIEW AVE SFR 1.00 209.33 144.20 054-593-014-000 956 PALMVIEW AVE SFR 1.00 209.33 144.20 054-593-015-000 902 PALMVIEW AVE SFR 1.00 209.33 144.20 054-593-016-000 898 PALMVIEW AVE SFR 1.00 209.33 144.20 054-593-017-000 866 PALMVIEW AVE SFR 1.00 209.33 144.20 054-593-018-000 834 PALMVIEW AVE SFR 1.00 209.33 144.20 054-593-019-000 802 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-001-000 1199 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-002-000 1179 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-003-000 1161 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-004-000 1141 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-005-000 1123 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-006-000 1103 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-007-000 1099 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-008-000 1079 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-009-000 1061 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-010-000 1041 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-011-000 1023 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-012-000 1003 DESERTVIEW AVE SFR 1.00 209.33 144.20 054-594-013-000 1002 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-014-000 1022 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-015-000 1040 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-016-000 1060 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-017-000 1078 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-018-000 1098 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-019-000 1102 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-020-000 1122 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-021-000 1140 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-022-000 1160 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-023-000 1178 PALMVIEW AVE SFR 1.00 209.33 144.20 054-594-024-000 1198 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-001-000 1199 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-002-000 1179 PALMVIEW AVE SFR 1.00 209.33 144.20 Willdan Financial Services Page 8 of 9
12.b
Packet Pg. 1636 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) APN Situs Address Land Use EBU Max Assessment Charge
City of El Centro
Buena Vista Landscaping and Lighting Assessment
Preliminary Assessment Roll
Fiscal Year 2024/25
Willdan Financial Services Page 9 of 9
054-595-003-000 1161 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-004-000 1141 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-005-000 1123 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-006-000 1103 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-007-000 1099 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-008-000 1079 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-009-000 1061 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-010-000 1041 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-011-000 1023 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-012-000 1003 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-013-000 999 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-014-000 957 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-015-000 903 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-016-000 899 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-017-000 867 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-018-000 835 PALMVIEW AVE SFR 1.00 209.33 144.20 054-595-019-000 803 PALMVIEW AVE SFR 1.00 209.33 144.20 Total $97,340.68 $67,053.00
Total Parcels 465
12.b
Packet Pg. 1637 Attachment: Buena Vista LL&D (6362 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Buena V) City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Finance
El Centro, CA 92243 Category: Resolution
Prepared By: Elizabeth Fuchen
SCHEDULED Department Head: Karla Chaparro
RESOLUTION (ID # 6361) DOC ID: 6361 A
Adopt Resolution Declaring its Intention to Levy and Collect Annual Assessments related to the Buena Vista Landscaping & Lighting District
CITY MANAGER’S RECOMMENDATION:
Adopt Resolution No. 24- , RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF EL CENTRO DECLARING ITS INTENTION TO LEVY AND COLLECT ANNUAL
ASSESSMENTS RELATED TO THE EL CENTRO BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT FOR FISCAL YEAR 2024-2025
FISCAL IMPACT:
Will be the first step in determining the coming year's assessment for The District.
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal #1 - Financial Governance Stability & Sustainability DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
Yes
BACKGROUND:
On annual basis the El Centro Buena Vista Landscape & Lighting District determines the levy and collection of assessments needed for the coming year. This is based on an Engineer's Report for the District. Prior to holding a public meeting on this issue, the items noted in the Resolutions presented to you in this document must be processed.
CONCLUSION:
Staff recommends Adopting Resolution No. 24- , RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF EL CENTRO DECLARING ITS INTENTION TO LEVY
AND COLLECT ANNUAL ASSESSMENTS RELATED TO THE EL CENTRO BUENA VISTA LANDSCAPING AND LIGHTING DISTRICT FOR THE FISCAL YEAR 2024- 2025
ATTACHMENTS:
• Buena Vista LLD - Intent Meeting - Intent Meeting 05 07 24 (PDF) 13 Packet Pg. 1638
04/2024/cdz/A24-0065/Reso/DeclaringIntentiontoCollect
AssessmentsBuenaVistaLLD 1
RESOLUTION NO. 24-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO DECLARING ITS INTENTION TO LEVY AND
COLLECT ANNUAL ASSESSMENTS RELATED TO THE EL
CENTRO BUENA VISTA LANDSCAPING AND LIGHTING
DISTRICT FOR FISCAL YEAR 2024-2025
WHEREAS, the City Council of the City of El Centro, California (the “City Council”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code of California, beginning with Section 22500 (the “Act”) and by previous resolution, initiated proceedings for the Buena Vista Landscaping and Lighting District (the “District”) to levy and collect annual assessments to pay for the operation, maintenance and servicing of landscaping, lighting and all appurtenant facilities related thereto for Fiscal Year 2024- 2025; and
WHEREAS, the City Council desires to levy and collect the annual assessments against lots and parcels of land within the District to pay the cost and expenses related to the improvements described in section 4 of this resolution; and
WHEREAS, the Engineer selected by the City Council has prepared and filed with the City Clerk for the City of El Centro, California (the “City”) a report in connection with the District and levy of assessments for Fiscal Year 2024-2025 (beginning July 1, 2024 and ending June 30, 2025) in accordance with Chapter 1, Article 4 of the Act, and the Council did, by previous resolution, preliminarily approve the report.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA DOES HEREBY BE RESOLVE AS FOLLOWS:
1. That the above recitals are true and correct.
2. That the City Council hereby declares that it is its intention to seek the annual levy of the District in accordance with Chapter 3, Section 22624 over and including the land within the District boundary, and to levy and collect assessments on all such land to pay the costs of the maintenance and servicing of the landscaping improvements and all appurtenant facilities and operations related thereto for Fiscal Year 2024-2025. The territory included within the District is generally described in section 3 of this resolution and is designated as Buena Vista Landscaping and Lighting District.
3. That the boundaries of the District are located on the west side of Eighth Street, between McCabe Road and Interstate 8.
4. That the landscaping improvements may include, but are not limited to all landscaping material and facilities within the District. These improvements include turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, and associated
13.a
Packet Pg. 1639 Attachment: Buena Vista LLD - Intent Meeting - Intent Meeting 05 07 24 (6361 : Adopt Resolution Declaring its Intention to Levy and Collect 04/2024/cdz/A24-0065/Reso/DeclaringIntentiontoCollect
AssessmentsBuenaVistaLLD 2
appurtenant facilities located within the streetscape (and perimeter landscaping) surrounding the developments. The street lighting improvements may include but are not limited to electrical energy, lighting fixtures, poles, meters, conduits, electrical cable and associated appurtenant facilities. For specific improvements reference Fiscal Year 2024-2025 engineer’s report.
5. That the proposed assessments for the District are outlined in the engineer’s annual levy report. The report details the proposed assessments necessary to provide for the annual operation, administration, services and maintenance of the improvements described in section 4 of this resolution and by reference said report is made part of this resolution.
6. That the District and the associated assessments as outlined in the engineer’s report are in compliance with the provisions of California Constitution Article XIIID.
7. That the City Council hereby declares its intention to conduct a public hearing concerning the District and the levy of assessments for the improvements related thereto in accordance with Chapter 3, Section 22626 of the Act.
8. That the notice is hereby given that a public hearing on these matters will be held by the City Council on Tuesday, May 21, 2024 at 6:00 p.m. or as soon thereafter as feasible in the regular meeting chambers of the City Council located at 1275 Main Street, El Centro, California.
9. That the City Clerk shall cause notice to be given of the time and place of the public hearing by causing the publishing of this resolution once in the local paper not less than ten (10) days before the date of the hearing and by posting a copy of this resolution on the official bulletin board customarily used by the City Council for the posting of notices.
10. That any interested person may file a written protest with the City Clerk prior to the conclusion of the hearing, or having previously filed protest, may file a written withdrawal of that protest. A written protest shall state all grounds of objection and a protest by a property owner shall contain a description sufficient to identify the property owned by such property owner. At the public hearing, all interested persons shall be afforded the opportunity to hear and be heard.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024.
CITY OF EL CENTRO
By: ____________________________
Sylvia Marroquin, Mayor
ATTEST:
By: ___________________________
Norma Wyles, City Clerk
13.a
Packet Pg. 1640 Attachment: Buena Vista LLD - Intent Meeting - Intent Meeting 05 07 24 (6361 : Adopt Resolution Declaring its Intention to Levy and Collect 04/2024/cdz/A24-0065/Reso/DeclaringIntentiontoCollect
AssessmentsBuenaVistaLLD 3
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
By:___________________________________
Elizabeth L. Martyn, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By ___________________________
Norma Wyles, City Clerk
13.a
Packet Pg. 1641 Attachment: Buena Vista LLD - Intent Meeting - Intent Meeting 05 07 24 (6361 : Adopt Resolution Declaring its Intention to Levy and Collect City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Finance
El Centro, CA 92243 Category: Resolution
Prepared By: Elizabeth Fuchen
SCHEDULED Department Head: Karla Chaparro
RESOLUTION (ID # 6366) DOC ID: 6366
Adopt Resolution to Initiate the Proceedings for the Levy and Collection of Assessments for the Legacy Ranch
Landscaping & Lighting District
CITY MANAGER’S RECOMMENDATION:
Adopt Resolution 24- , A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO INITIATING PROCEEDINGS FOR THE LEVY AND COLLECTION OF
ASSESSMENTS FOR THE EL CENTRO LEGACY RANCH LANDSCAPING AND LIGHTING DISTRICT, FOR FISCAL YEAR 2024-2025; AND ORDERING THE
PREPARATION OF AN ENGINEER'S REPORT IN CONNECTION THEREWITH FISCAL IMPACT:
Will be the first step in determining the coming year’s assessment for The District.
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal # 1 - Financial & Governance Stability & Sustainability DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
Yes
BACKGROUND:
On an annual basis the El Centro Legacy Ranch Landscape and Lighting District determines the levy and collection of assessments needed for the coming year. This is based on an Engineer’s Report for the District. Prior to holding a public meeting on this issue, the items noted in the Resolutions presented to you in this document must be processed.
CONCLUSION:
Staff recommends Adopting Resolution 24- , A RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF EL CENTRO INITIATING PROCEEDINGS FOR THE
LEVY AND COLLECTION OF ASSESSMENTS FOR THE EL CENTRO LEGACY RANCH LANDSCAPING AND LIGHTING DISTRICT FOR FISCAL YEAR 2024-2025;
AND ORDERING THE PREPARATION OF AN ENGINEER'S REPORT IN
CONNECTION THEREWITH
ATTACHMENTS:
• Legacy Ranch LLD - Initiating Proceedings - 05-07-2024 (PDF) 14 Packet Pg. 1642
04/2024/cdz/A24-0062/Reso/InitiateCollectionofAssessments LegacyRanchLLD 1
RESOLUTION NO. 24-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO INITIATING PROCEEDINGS FOR THE LEVY
AND COLLECTION OF ASSESSMENTS FOR THE EL
CENTRO LEGACY RANCH LANDSCAPING AND LIGHTING
DISTRICT, FOR FISCAL YEAR 2024-2025; AND ORDERING
THE PREPARATION OF AN ENGINEER’S REPORT IN
CONNECTION THEREWITH
WHEREAS, the City Council of the City of El Centro, California (the “City Council”), pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code of California, beginning with Section 22500 (the “Act”), desires to levy and collect annual assessments for the Legacy Ranch Landscaping and Lighting District (the “District”) to pay for the operation, maintenance and servicing of the landscaping improvements and all appurtenant facilities related thereto. The Act provides for the levy of such assessments by the County of Imperial on behalf of the City of El Centro, California (the “City”) pursuant to Chapter 4, Article 2; and
WHEREAS, the District and the associated assessments are in compliance with the provisions of California Constitution Article XIII; and
WHEREAS, the City Council has retained Willdan Financial Services as the Engineer for the purpose of assisting with the annual levy of the District, and to prepare and file an Engineer’s Report with the City Clerk in accordance with the Act.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS:
1. The City Council hereby proposes to levy and collect assessments against the lots and parcels of land within such District to pay for the costs and expenses of the improvements described in Section 3 hereof for the fiscal year commencing July 1, 2024, and ending June 30, 2025, pursuant to the Act and as provided by Article XIII D of the California Constitution.
2. The general location and boundaries of the District are shown on maps on file in the office of the City’s City Clerk, are incorporated herein by reference, and open to public inspection.
3. The proposed improvements may be briefly described as follows: the operation, maintenance and servicing of street lighting, turf, ground cover, shrubs, trees, plants, irrigation and drainage systems, ornamental lighting structures, masonry walls or other fencing, entryway monuments, street lighting and associated appurtenant facilities located within the streetscape (and perimeter landscaping) surrounding the developments. Maintenance means the furnishing of services and materials for the ordinary and usual maintenance, operation and servicing of the street lighting, ornamental structures, landscaping and appurtenant facilities, including repair, removal or replacement of all or part of any of the street lighting, ornamental structures, landscaping or appurtenant facilities. Servicing means the furnishing of electricity for the street lighting and operation of the ornamental structures, landscaping, and appurtenant
14.a
Packet Pg. 1643 Attachment: Legacy Ranch LLD - Initiating Proceedings - 05-07-2024 (6366 : Adopt Resolution to Initiate the Proceedings for the Levy and 04/2024/cdz/A24-0062/Reso/InitiateCollectionofAssessments LegacyRanchLLD 2
facilities, and water for the irrigation and control of the landscaping and the maintenance of any of the ornamental structures, landscaping, lighting and appurtenant facilities.
4. The City Council hereby designates Willdan Financial Services as the Engineer for the purposes of these proceedings and orders the Engineer to prepare and file with the City Clerk a written report in accordance with Article XIII D, Section 4 of the California Constitution and Article 4 (commencing with Section 22565) of Chapter 1 of the Act for fiscal year 2024-2025 commencing July 1, 2024, and ending June 30, 2025. Such Report shall refer to the District by its distinctive designation.
5. Lots or parcels within the District that are owned or used by any county, city, city and county, special district or any other local or regional governmental entity, the State of California or the United States shall be assessed unless the City demonstrates by clear and convincing evidence that such lots or parcels receive no special benefit from the proposed improvements.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024.
CITY OF EL CENTRO
By: _________________________
Sylvia Marroquin, Mayor
ATTEST:
By: __________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
By: __________________________
Elizabeth L. Martyn, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024, by the following vote:
14.a
Packet Pg. 1644 Attachment: Legacy Ranch LLD - Initiating Proceedings - 05-07-2024 (6366 : Adopt Resolution to Initiate the Proceedings for the Levy and 04/2024/cdz/A24-0062/Reso/InitiateCollectionofAssessments LegacyRanchLLD 3
AYES:
NOES:
ABSENT:
ABSTAINED:
By ____________________________
Norma Wyles, City Clerk
14.a
Packet Pg. 1645 Attachment: Legacy Ranch LLD - Initiating Proceedings - 05-07-2024 (6366 : Adopt Resolution to Initiate the Proceedings for the Levy and City Council of the City of El Centro Meeting: 05/07/24 11:30 AM 1275 Main Street Department: Finance
El Centro, CA 92243 Category: Resolution
Prepared By: Elizabeth Fuchen
SCHEDULED Department Head: Karla Chaparro
RESOLUTION (ID # 6365) DOC ID: 6365
Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the Legacy Ranch
Landscaping & Lighting District
CITY MANAGER’S RECOMMENDATION:
Adopt Resolution 24- , A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO FOR PRELIMINARY APPROVAL OF THE ENGINEER'S ANNUAL LEVY
REPORT REGARDING THE EL CENTRO LEGACY RANCH LANDSCAPING AND LIGHTING DISTRICT; AND THE LEVY AND COLLECTION OF ANNUAL ASSESSMENTS RELATED THERETO FOR FISCAL YEAR 2024-2025
FISCAL IMPACT:
Will be the first step in determining the coming year’s assessment for The District.
STRATEGIC PLANNING PROGRAM 2022-2027 RELATION:
Goal # 1 - Financial & Governance Stability & Sustainability DUE DILIGENCE CHECK FOR CONTRACTORS/CONSULTANTS: DID THE
DEPARTMENT VERIFY CURRENT EL CENTRO BUSINESS LICENSE,
CONTRACTORS LICENSE, REFERENCE CHECKS, INSURANCE, ETC:
Yes
BACKGROUND:
On an annual basis the El Centro Legacy Ranch Landscape and Lighting District determines the levy and collection of assessments needed for the coming year. This is based on an Engineer’s Report for the District. Prior to holding a public meeting on this issue, the items noted in the Resolutions presented to you in this document must be processed
CONCLUSION:
Staff recommends Adopting Resolution 24- , A RESOLUTION OF THE CITY
COUNCIL OF THE CITY OF EL CENTRO FOR PRELIMINARY APPROVAL OF THE
ENGINEER'S ANNUAL LEVY REPORT REGARDING THE EL CENTRO LEGACY RANCH LANDSCAPING AND LIGHTING DISTRICT; AND THE LEVY AND
COLLECTION OF ANNUAL ASSESSMENTS RELATED THERETO FOR FISCAL YEAR 2024-2025
ATTACHMENTS:
• Legacy Ranch LLD - Engineer's Report - Intent Meeting 05-07-2024 (PDF) • Legacy Ranch LL&D (PDF)
15 Packet Pg. 1646
04/2024/cdz/A24-0062/Reso/ApprovingEngineersRpt
LegacyRanchLLD 1
RESOLUTION NO. 24-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
EL CENTRO FOR PRELIMINARY APPROVAL OF THE
ENGINEER’S ANNUAL LEVY REPORT REGARDING THE EL
CENTRO LEGACY RANCH LANDSCAPING AND LIGHTING
DISTRICT; AND THE LEVY AND COLLECTION OF ANNUAL
ASSESSMENTS RELATED THERETO FOR FISCAL YEAR
2024-2025
WHEREAS, the City Council of the City of El Centro, California (the “City Council”) has, by previous resolution, ordered the preparation of an Engineer’s report (the “Report”) regarding the assessment district designated as the Legacy Ranch Landscaping and Lighting District (the “District”), and the levy and collection of assessments related thereto for Fiscal Year 2024-2025, pursuant to the provisions of the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the Streets and Highways Code of California, beginning with Section 22500 (the “Act”); and WHEREAS, there has now been presented to this City Council the Report as required by Chapter 3, Section 22623 of said Act; and
WHEREAS, the City Council has carefully examined and reviewed the Report as presented, and is preliminarily satisfied with the District, the improvements described therein, each of the budget items and documents as set forth therein, and is satisfied that the proposed annual assessments, on a preliminary basis, have been assigned in accordance with the special benefits received from the improvements, operation, administration, maintenance and services to be performed within the District, as set forth in the Report.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF EL CENTRO, CALIFORNIA DOES HEREBY RESOLVE AS FOLLOWS:
1. The preceding recitals are true and correct.
2. The Report, as presented, consists of the following:
• A Description of Improvements.
• A Diagram of the District.
• The proposed Annual Budget for the fiscal year (Costs and Expenses). • The Method of Apportionment that details the method of calculating each parcel’s proportional special benefits and annual assessment. • The District Roll containing the Levy for each Assessor Parcel Number within the District commencing Fiscal Year 2024-2025.
3. The District and the associated assessments as outlined in the Engineer’s Report are in compliance with the provisions of California Constitution Article XIIID.
15.a
Packet Pg. 1647 Attachment: Legacy Ranch LLD - Engineer's Report - Intent Meeting 05-07-2024 (6365 : Adopt Resolution for Preliminary Approval of the 04/2024/cdz/A24-0062/Reso/ApprovingEngineersRpt
LegacyRanchLLD 2
4. The Report is hereby approved on a preliminary basis, and ordered to be filed in the Office of the City Clerk as a permanent record and to remain open to public inspection.
5. The City Clerk shall certify to the passage and adoption of this Resolution, and the minutes of this meeting shall so reflect the presentation of the Report.
PASSED AND ADOPTED at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024.
CITY OF EL CENTRO
By: ____________________________
Sylvia Marroquin, Mayor
ATTEST:
By: ___________________________
Norma Wyles, City Clerk
APPROVED AS TO FORM:
OFFICE OF THE CITY ATTORNEY
By: ___________________________
Elizabeth L. Martyn, City Attorney
STATE OF CALIFORNIA )
COUNTY OF IMPERIAL ) ss
CITY OF EL CENTRO )
I, Norma Wyles, City Clerk of the City of El Centro, California, do hereby certify that the foregoing Resolution No. 24- was duly and regularly adopted at a regular meeting of the City Council of the City of El Centro, California, held on the day of , 2024, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAINED:
By___________________________
Norma Wyles, City Clerk
15.a
Packet Pg. 1648 Attachment: Legacy Ranch LLD - Engineer's Report - Intent Meeting 05-07-2024 (6365 : Adopt Resolution for Preliminary Approval of the
City of El Centro
Legacy Ranch
Landscape and Lighting District
2024/2025 ENGINEER’S REPORT
Intent Meeting: May 07, 2024
Public Hearing: May 21, 2024
27368 Via Industria, Suite 200
Temecula, California 92590
T. 951.587.3500 800.755.6864
F. 951.587.3510 888.326.6864
www.willdan.com
15.b
Packet Pg. 1649 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the
ENGINEER'S REPORT AFFIDAVIT
Legacy Ranch Landscaping and Lighting District
The District includes the parcels of land within the residential and commercial subdivisions known as
Legacy Ranch
City of El Centro,
County of Imperial, State of California
This Report identifies the parcels within Legacy Ranch Landscaping and Lighting District and relevant zones therein including the improvements, budgets, parcels and assessments to be levied for fiscal year 2024/2025, as they existed at the time of the passage of the Resolution of Intention. Reference is hereby made to the Imperial County Assessor’s maps for a detailed description of the lines and dimensions of parcels within the District. The undersigned respectfully submits the enclosed Report as directed by the City Council.
Dated this ____________ day of ______________, 2024.
Willdan Financial Services
Assessment Engineer
On Behalf of the City of El Centro
By: ________________________________
Michelle Laase
Project Manager, District Administration Services
By: ________________________________
Tyrone Peter
P.E. # C 81888
15.b
Packet Pg. 1650 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the
PRELIMINARY APPROVAL
This Engineer’s Report and the proposed assessments described herein have been preliminarily approved by the City Council of the City of El Centro on this ______ day of ____________, 2024.
_________________________________
Norma Wyles, CMC
City Clerk
City of El Centro
FINAL APPROVAL
This Engineer’s Report, the improvements and assessments described herein were approved and adopted by the City Council of the City of El Centro on this ______ day of ___________, 2024.
________________________________
Norma Wyles, CMC
City Clerk
City of El Centro
15.b
Packet Pg. 1651 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the
TABLE OF CONTENTS
I. EXECUTIVE SUMMARY 1
A. INTRODUCTION 1
II. PLANS AND SPECIFICATIONS 2
A. DESCRIPTION OF THE DISTRICT 2
B. IMPROVEMENTS AUTHORIZED BY THE 1972 ACT 2
C. DESCRIPTION OF IMPROVEMENTS AND SERVICES 3
III. METHOD OF APPORTIONMENT 6
A. GENERAL 6
B. PROPOSITION 218 BENEFIT ANALYSIS 6
C. SPECIAL BENEFIT ANALYSIS 7
D. ASSESSMENT METHODOLOGY 9
E. ASSESSMENT RANGE FORMULA 12
IV. DISTRICT BUDGET 13
A. DESCRIPTION OF BUDGET ITEMS 13
B. PROPOSED BUDGET FISCAL YEAR 2024/2025 17
C. HISTORICAL RATES 18
V. DISTRICT DIAGRAM 19
VI. 2024/2025 ASSESSMENT ROLL 20
15.b
Packet Pg. 1652 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the 2024/2025 Legacy Ranch LLD Page 1 of 20
I. EXECUTIVE SUMMARY
A. INTRODUCTION
The City of El Centro (“City”) created the Legacy Ranch Landscaping and Lighting District (“District”) in order to provide for the ongoing maintenance, operation and servicing of park, certain perimeter landscaping, off-site landscaping improvements, and street lighting improvements installed in connection with development of properties within the District. This District provides the financial mechanism (annual assessments) by which the ongoing operation and maintenance of these improvements are funded. The District was formed in 2007 and annual assessments are levied pursuant to the Landscaping and Lighting Act of 1972, Part 2 of Division 15 of the California Streets and Highways Code (“1972 Act”) and in compliance with the substantive and procedural requirements of the “California State Constitution” Article XIIID (“Article XIIID”).
This Engineer’s Annual Levy Report (“Report”) describes the District and the proposed assessments for Fiscal Year 2024/2025. The annual budget for the maintenance and operation of the improvements is based on estimated expenses for the upcoming Fiscal Year. Parcels within the District are assessed proportionately for only those improvements and services that are a special benefit.
The District, boundaries, improvements and services, method of apportionment and assessments described in this Report are based on current development and improvement plans including direct expenditures, incidental expenses, and reserves associated with the maintenance and servicing of the improvements.
These detailed plans and specifications approved by the City are made part of this report by reference.
The word “parcel,” for the purposes of this Report, refers to an individual property assigned its own Assessment Number by the Imperial County Assessor’s Office.
The Imperial County Auditor/Controller uses Assessment Numbers and specific Fund Numbers to identify properties assessed on the tax roll for special district benefit assessments.
Following consideration of public comments and written protests at a noticed Public Hearing, the City Council may confirm the Report as submitted or amended and order the levy and collection of assessments for Fiscal Year 2024/2025 pursuant to the 1972 Act. The assessment information approved will be submitted to the County Auditor/Controller and included on the property tax roll for each benefiting parcel. The rates will be calculated during Fiscal Year 2023/2024 for Fiscal Year 2024/2025, and as approved will be submitted to the
15.b
Packet Pg. 1653 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the 2024/2025 Legacy Ranch LLD Page 2 of 20
Imperial County Auditor/Controller to be included on the property tax roll for each parcel for Fiscal Year 2024/2025.
II. PLANS AND SPECIFICATIONS
A. DESCRIPTION OF THE DISTRICT
The District consists of all lots, parcels and subdivisions of land located in the development area described below:
Legacy Ranch. The District encompasses an area of land of approximately thirty-seven acres (37 acres) in size. It is bordered on the east side by Farnsworth Road and on the west side by Third Street and is located between W. Dannenberg Road to the north and W. McCabe Road to the south. The location and borders of the District can be seen in section V of this Report.
The District includes:
143 single-family residential lots, and
A 1.5-acre community park which is located wholly within the residential subdivision of the District and is to be dedicated to the City. The park is adjacent to and south of Charles Elmore Drive and is surrounded by residential lots of the District on its three other sides.
B. IMPROVEMENTS AUTHORIZED BY THE 1972 ACT
As applicable or may be applicable to this District, the 1972 Act defines improvements to mean one or any combination of the following:
The installation or planting of landscaping.
The installation or construction of statuary, fountains, and other ornamental structures and facilities.
The installation or construction of public lighting facilities. The installation or construction of any facilities which are appurtenant to any of the foregoing or which are necessary or convenient for the maintenance or servicing thereof, including, but not limited to, grading, clearing, removal of debris, the installation or construction of curbs, gutters, walls, sidewalks, or paving, or water, irrigation, drainage, or electrical facilities.
The maintenance or servicing, or both, of any of the foregoing.
15.b
Packet Pg. 1654 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the 2024/2025 Legacy Ranch LLD Page 3 of 20
The acquisition of any existing improvement otherwise authorized pursuant to this section.
Incidental expenses associated with the improvements including, but not limited to:
The cost of preparation of the report, including plans, specifications, estimates, diagram, and assessment;
The costs of printing, advertising, and the publishing, posting and mailing of notices;
Compensation payable to the County for collection of assessments; Compensation of any engineer or attorney employed to render services; Any other expenses incidental to the construction, installation, or maintenance and servicing of the improvements;
Any expenses incidental to the issuance of bonds or notes pursuant to Section 22662.5.
Costs associated with any elections held for the approval of a new or increased assessment.
The 1972 Act defines "Maintain" or "Maintenance" to mean furnishing of services and materials for the ordinary and usual maintenance, operation, and servicing of any improvement, including:
Repair, removal, or replacement of all or any part of any improvement. Providing for the life, growth, health, and beauty of landscaping, including cultivation, irrigation, trimming, spraying, fertilizing, or treating for disease or injury.
The removal of trimmings, rubbish, debris, and other solid waste. The cleaning, sandblasting, and painting of walls and other improvements to remove or cover graffiti.
C. DESCRIPTION OF IMPROVEMENTS AND SERVICES
The purpose of this District is to ensure the ongoing maintenance, operation and servicing of park, landscaping, and lighting improvements established or installed in connection with development of properties within the District. The improvements to be maintained and funded through the District assessments are generally described as:
15.b
Packet Pg. 1655 Attachment: Legacy Ranch LL&D (6365 : Adopt Resolution for Preliminary Approval of the Engineer's Annual Levy Report regarding the 2024/2025 Legacy Ranch LLD Page 4 of 20
Park Maintenance
Park landscaping including trees, vegetation, irrigation systems and hardscape improvements located within the park which is to be dedicated to the City for maintenance;
Grass field for open play;
Playground equipment including a tot lot with a shade structure; Pavilion for picnic area;
Covered picnic area with picnic tables;
Masonry including a park monument and a flagpole;
Furnishings including a water fountain, benches and trash receptacles; Security lighting throughout the park;
Approximately 49,000 square feet of turf grass including a grass field of approximately 35,000 square feet inside of the park walk and 15,000 square feet outside of the park walk for open play;
Trees of assorted varieties of approximately 24” box size; Ornamental shrubs of approximately 5-gallon size;
Ornamental vines of approximately 5-gallon size;
Meandering concrete park walks along the perimeter of the park including concrete under pavilions, benches and memorial plaza;
Concrete mow curbs;
A tot lot with a shade structure and playground equipment; A covered picnic area including picnic tables;
A memorial park monument sign with a plaque on the north side of the park; and a flagpole;
Water fountains;
Park benches; and
Trash receptacles; and
All appurtenant facilities, equipment, materials and utilities related to the aforementioned improvements.