City · Energy
Concord
Energy contracts the Concord City Council took up since 2022. All Concord meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
5actions
5vendors
$739,586approved (recorded vote)
$735,895proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2025-12-02 | Tesco Controls | Considering approving the purchase of 60 batteries and 50 inverters from Tesco Controls to replace aging equipment at citywide traffic signal locations in an am Battery storage | Sole-source award | $221,860 not to exceed | 60 batteries and 50 inverters | No vote recorded | packet · city original |
| 2025-06-24 | TAPCO | Purchase of City-furnished Rectangular Rapid Flashing Beacons (RRFB) for Crosswalk Enhancements project (Project No. 2696), $113,150.06 LED streetlights | Cooperative purchase | $113,150 | RRFBs at nine locations | No vote recorded | packet · city original |
| 2023-08-08 | VS Electric | Award of a Construction Contract in the not-to-exceed amount of $400,885.20 to VS Electric for the Police Department Generator and Transfer Switch Replacement P check Microgrids and backup power | Award | $400,885 not to exceed | emergency back-up generator and associated automatic transfer switch | Approved passed by unanimous vote of the Council | agenda · minutes · packet · packet · city original |
| 2023-08-08 | Vince Sigal Electric | Police Department Generator and Transfer Switch Replacement Project - Award Construction Contract to VS Electric check Microgrids and backup power | Award | $400,885 not to exceed | 400-amp emergency back-up generator and automatic transfer switch | No vote recorded | packet · city original |
| 2022-01-25 | DC Electric Group | Award Construction Contract for Arterial/Collector LED Streetlight Retrofit (Project No. 2566) – DC Electric Group Inc. LED streetlights | Award | $338,701 | Approved unanimous vote of the Council | packet · city original |