City · Energy
Corona
Energy contracts the Corona City Council took up since 2022. All Corona meetings.
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
17actions
13vendors
$1,852,964approved (recorded vote)
$77,415,244proposed, no vote in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | Vendor | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-08-05 | Quinn Power Systems | PURCHASE AUTHORIZATION FOR TOWABLE EMERGENCY BACKUP GENERATOR FOR SIERRA DEL ORO LIFT STATION Microgrids and backup power | Purchase order | $221,000 | one XQ230 towable emergency generator | Approved Aye (4): Jacque Casillas, Tony Daddario, Tom Richins, and Jim Steiner; Absent… | staff report · agenda · minutes · packet · packet |
| 2026-05-20 | Quinn Power Systems | Authorize the City Manager, or his designee, to issue a Purchase Order to Quinn Power Systems in the amount of $295,905 to Purchase Two Emergency Standby Genera Microgrids and backup power | Purchase order | $295,905 | two emergency standby generator sets and one portable 288 kW generator | Approved | staff report · agenda · minutes · packet · packet |
| 2026-05-06 | Global Power Group | Approve the Fourth Amendment to the Maintenance and General Services Agreement with Global Power Group to increase the total compensation by $125,000 for total Microgrids and backup power | Amendment | $380,000 | No vote recorded | staff report · packet · city original | |
| 2026-05-06 | Astrum Utility Services | Approve the Professional Services Agreement with Astrum Utility Services, LLC for professional energy consulting services Other | Sole-source award | $429,600 per year | No vote recorded | staff report · staff report · packet · city original | |
| 2026-05-06 | Quinn Power Systems | Exhibit 6 - Quinn Quote D30 generator for Corona DWP Airport Lift Station (Quotation No. 260211) Microgrids and backup power | Purchase order | $66,873 | 1 Caterpillar Model D30 30kW stationary emergency generator set Sourcewell Product Discount is 23% (- $ 7,302.50) | No vote recorded | staff report · packet · city original |
| 2024-12-18 | CLP Engineering | PROFESSIONAL SERVICES AGREEMENT WITH CLP ENGINEERING LLC FOR AN ELECTRIC CAPACITY IMPACT STUDY Other | Award | $113,460 | Approved APPROVED (5 to 0) | staff report · agenda · minutes · packet · packet | |
| 2024-12-04 | Quinn Power Systems | ISSUANCE OF PURCHASE ORDER TO QUINN POWER SYSTEMS FOR TWO EMERGENCY STANDBY GENERATOR SETS FOR THE SIERRA DEL ORO WATER TREATMENT FACILITY AND THE GREEN RIVER L Microgrids and backup power | Cooperative purchase | $217,939 | two generator sets: Caterpillar D200-2 rated 200kW standby and D100-8 … | Approved | staff report · agenda · minutes · packet · packet |
| 2024-06-05 | RB Inyokern Solar WDAT 1203 | AGREEMENT - COMMUNITY RENEWABLE PROJECT PARTICIPATION Power supply (municipal utilities) | Award | — | 33 eligible accounts using 380,000 kWh each year $0.10866/kWh credit; subscribers pay 90% of credit value approximately $4,000 per year | No vote recorded | staff report · staff report · agenda · city original |
| 2024-05-01 | Astrum Utility Services | Second Amendment to the Professional Services Agreement with Astrum Utility Services to extend the term and increase total compensation Other | Amendment | $225,000 per year | No vote recorded | staff report · city original | |
| 2023-09-20 | Albert A. Webb Associates | Professional services agreement with Albert A. Webb Associates for design and engineering services for the Water Reclamation Facility No. 2 lift station and Sie Microgrids and backup power | Award | $343,160 | replacement of the existing 500kW standby generator at Water Reclamati… | Approved Aye: 5 - Daddario, Richins, Casillas, Speake, and Steiner | staff report · other · city original |
| 2023-04-05 | RC Foster | BID & PURCHASE - CONSTRUCTION CONTRACT WITH RC FOSTER CORPORATION IN THE AMOUNT OF $661,500 FOR THE WELL 17A EMERGENCY GENERATOR, PROJECT NO. 2021-43; NOTICE IN Microgrids and backup power | Award | $661,500 not to exceed | Approved | staff report · staff report · agenda · minutes · other | |
| 2023-03-01 | TEC of California | Issuance of a Purchase Order to TEC of California, Inc. for the Replacement of a Diesel Terminal Tractor with an Electric Vehicle Terminal Tractor from Autocar check Fleet vehicles | Purchase order | $385,661 | one electric vehicle terminal tractor | No vote recorded | staff report · agenda · city original |
| 2023-03-01 | Autocar | Purchase of electric vehicle terminal tractor from Autocar, LLC through TEC of California, Inc. via Sourcewell cooperative contract check Fleet vehicles | Cooperative purchase | $385,661 | 1 electric terminal tractor | No vote recorded | staff report · city original |
| 2022-06-01 | Gaskell West | Resolution approving the Consent and Agreement and the form of the Estoppel Certificate for the Renewable Power Purchase Agreement with RE Gaskell West 2, LLC. Power supply (municipal utilities) | Amendment | — | approximately 29 MW solar photovoltaic plant with integrated 20MWac/80… | Approved Aye: 5 - Speake, Daddario, Casillas, Richins, and Steiner | staff report · staff report · agenda · minutes · other |
| 2022-06-01 | GW | Gaskell West PPA - Consent and Agreement to collateral financing assignment and Estoppel Certificate (Resolution 2022-047) Power supply (municipal utilities) | Amendment | $34,190,549 | 11 MW of electric generation and 8 MW of BESS | No vote recorded | staff report · city original |
| 2022-01-19 | AM Wind Repower | Resolution approving the Consent and Agreement and the form of Estoppel Certificate for the Renewable Power Purchase Agreement with AM Wind Repower, LLC. Power supply (municipal utilities) | Other | — | 11 megawatts $40.00 per MWh savings of $6,237,900 over the 25-year contract term | Approved Aye: 5 - Speake, Daddario, Casillas, Richins, and Steiner | staff report · staff report · agenda · minutes · other |
| 2022-01-19 | Brookfield | Alta Mesa wind PPA consent to collateral financing assignment and estoppel certificate (Resolution 2022-007) Power supply (municipal utilities) | Other | $41,351,900 | 11 MW share of AM Facility energy output $40.00 per MWh savings of $6,237,900 over the 25-year contract term | No vote recorded | staff report · city original |