Vendor · Energy
Pramira
Contract actions with Pramira in California city council documents since 2022 — also written as PRAMIRA, INCORPORATED; PRAMIRA, Inc; Pramira Inc; Pramira Inc.; Pramira, Inc..
Extracted automatically — check the source. These rows were read out of the cities' own agendas, staff reports and minutes by a language model (claude-haiku-5-5/v5) on 2026-10-20. Each amount links to the passage it came from and each row to the city's original file, which is the official record. Rows marked check had a problem the checks caught.
6actions
4cities
$1,897,299approved (recorded vote)
$1,115,444proposed, no vote in the index
2024-06-04first action in the index
Dollar totals add the amount each action states: an amendment's new total can repeat an earlier award, and annual amounts are counted once. Use them as a rough size, the rows for detail.
Actions
| Date | City | Item | Action | Amount | Size · price · savings | Outcome | Sources |
|---|---|---|---|---|---|---|---|
| 2026-10-21 | Imperial | Award a construction contract for the EV Charging Station Installation and EV Purchase Phase II & III project Bid No. 2026-06 CIP No. 837 to Pramira, Inc. Bundles | Award | $297,979 | two (2) EV charging stations at City of Imperial Transit Center | No vote recorded | agenda · packet · city original |
| 2026-10-07 | Imperial | Award a construction contract for the EV Charging Station Installation and EV Purchase Phase I project Bid No. 2026-09 CIP No. 825 to Pramira, Inc. EV charging | Award | $399,798 | one (1) EV charging station | No vote recorded | agenda · packet · city original |
| 2026-04-27 | Azusa | Consideration to Award Construction of EV Charging Stations Contract in Accordance with Plan and Specification LD2026-2 to Pramira Inc, and Authorize the Issuan EV charging | Award | $417,667 not to exceed | EV charging stations | No vote recorded | agenda · city original |
| 2026-04-07 | Murrieta | Acceptance of Additional CalOES Grant Funds for the Fire Station 1 and City Hall Emergency Generator Replacement Project, Request for Additional Construction Co check Microgrids and backup power | Amendment | $524,521 | Approved Ayes: Warren, DeForest, Holliday, Levell; Noes: None; Absent: Stone | staff report · agenda · minutes · packet · packet | |
| 2025-06-04 | Rancho Cucamonga | Consideration of a Contract with Pramira Inc. for the RC Corporate Yard EV Charging Project in the Amount of $848,256.42 plus a contingency in the amount of $16 EV charging | Award | $848,256 | 32 charging locations | Approved 5-0 | agenda · minutes · packet · packet · city original |
| 2024-06-04 | Murrieta | Award a Contract to Pramira, Inc. for the Replacement of Emergency Generators at the City of Murrieta City Hall and Fire Station 1 Microgrids and backup power | Award | $524,522 | Approved Ayes: DeForest, Levell, Holliday, Warren, Stone; Noes: None | agenda · minutes · packet · packet · other |