NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -126 • All sites listed pursuant to Section 25356 of the Health and Safety Code • All sites included in the Abandoned Site Assessment Program The California DTSC is responsible for a portion of the information contained in the Cortese List.

Other State and local government agencies are required to provide additional hazardous material release information for the Cortese List.

California Occupational Safety and Health Administration Regulations. California Occupational Safety and Health Administration (Cal/OSHA) is responsible for developing and enforcing workplace safety standards and ensuring worker safety in the handling and use of hazardous materials. Among other requirements, Cal/OSHA requires many entities to prepare injury and illness prevention plans and chemical hygiene plans and provides specific regulations to limit exposure of construction workers to lead.

California Office of Environmental Health Hazard Assessment. The California Office of Environmental Health Hazard Assessment (OEHHA) is administered by CalEPA to protect and enhance public health and the environment by scientific evaluation of risks posed by hazardous substances. The OEHHA developed California Human Health Screening Levels (CHHSL) 56 on behalf of the CalEPA pursuant to Health and Safety Code Section 57008 to establish thresholds of chemical concentrations of concern for risks to human health, specifically, an excess of lifetime cancer risk of one-in-a-million (10-6
) and a hazard quotient of 1.0 for non-cancer health effects. It should be noted that CHHSL have no regulatory effect and are not intended for use by regulatory agencies that have authority to require remediation of contaminated soil. The numbers are solely advisory and published as reference values for use by citizen groups, community organizations, property owners, developers, and local government officials to estimate the degree of effort that may be necessary to remediate a contaminated site.

California Environmental Protection Agency. The California Environmental Protection Agency (CalEPA) is authorized by the EPA to enforce and implement certain laws and regulations regarding hazardous materials. Under CalEPA, the California DTSC protects the State and people from hazardous waste exposure under RCRA and the California Health and Safety Code. The DTSC requirements include written programs and response plans such as preparation of an HMBP.

Programs under the DTSC include aftermath clean-up of improper hazardous waste management, evaluation of samples taken from sites, regulation enforcement regarding use, storage, and disposal of hazardous materials, and encouragement of pollution prevention.

California Emergency Management Agency. The California Emergency Management Agency, established as part of the Governor’s Office on January 1, 2009 [Assembly Bill (AB) 38], is responsible for overseeing and coordinating emergency preparedness, response, recovery, and homeland security activities within the State and is supported by local government. 56 California Office of Environmental Health Hazard Assessment. 2010. California Human Health Screening Levels. September 23.

Page 270 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-127 California Building Code. The CBC, contained in Part 2 of Title 24 of the CCR, identifies building design standards, and includes standards for fire safety. The CBC is updated every 3 years, with the most recent version of the code effective January 1, 2023. The CBC is effective statewide; however, local jurisdictions may adopt more restrictive standards based on locality’s conditions. A local city or county building official must check plans for commercial and residential buildings to ensure compliance with the CBC. Fire safety compliance with the CBC includes fire sprinkler installation in all new residential, high rise, and hazardous material buildings; establishment of fire-resistant standards for fire doors, building materials, and certain types of construction; debris and vegetation clearance within a prescribed distance from occupied structures in wildfire hazard areas.

California Fire Code. The California Fire Code (CFC) is updated every 3 years with the most current update effective January 1, 2020. The CFC contained in Part 9 of CCR Title 24 incorporates by adoption the International Fire Code of the International Code Council with California amendments.

Local jurisdictions can also adopt more restrictive standards based on local conditions, as previously mentioned with the CBC. The CFC regulates building standards, fire department access, fire protection systems and devices, fire and explosion hazard safety, hazardous material storage and use, and building inspection standards.

California Emergency Services Act. Government Code Sections 8550–8692 provide for the assignment of functions to be performed by various agencies during an emergency so that the most effective use may be made of all manpower, resources, and facilities for dealing with any emergency. The coordination of all emergency services is recognized by the State to mitigate the effects of natural, manmade, or war-caused emergencies that result in conditions of disaster or extreme peril to life, property, and the resources of the State, and generally, to protect the health and safety and preserve the lives and property of the people of the State.

California Public Utilities Code and Airport Land Use Compatibility Plans. California Public Utilities Code Sections 21670 through 21679.5 (State Aeronautics Act) require each county in which there is a public-use airport or military airfield to establish an Airport Land Use Commission (ALUC). The ALUC is responsible for preparing and adopting an Airport Land Use Compatibility Plan (LUCP) to promote compatibility between airports and surrounding land uses. The purpose of an LUCP is to protect the public health, safety, and welfare by minimizing public exposure to excessive aircraft noise and safety hazards while protecting the long-term operational integrity of airports and military airfields.

Airport Land Use Compatibility Plans establish policies and criteria for evaluating the compatibility of proposed land uses with airport operations. These plans typically address aircraft noise, overflight, safety, protection of navigable airspace, hazards to flight, and land use compatibility. Development proposals within an Airport Influence Area are reviewed for consistency with the applicable LUCP and may be subject to review by the Airport Land Use Commission. Airport compatibility planning also considers land uses that may create hazards to aircraft operations, including wildlife attractants, sources of glare, smoke, lighting, electronic interference, and structures that may penetrate protected airspace.

The Solano County Airport Land Use Commission has adopted the Travis Air Force Base Airport Land Use Compatibility Plan, which establishes compatibility zones and development policies within the

Page 271 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -128 Airport Influence Area surrounding Travis Air Force Base. The LUCP includes criteria related to aircraft noise, safety, airspace protection, and wildlife hazards to ensure that future land uses remain compatible with military aviation operations.California Government Code Section 51178.

This government code requires the State Fire Marshal to identify areas in the State as moderate, high, and very high fire hazard severity zones based on consistent statewide criteria and based on the severity of fire hazard that is expected to prevail in those areas. Moderate, high, and very high fire hazard severity zones shall be based on fuel loading, slope, fire weather, and other relevant factors including areas where winds have been identified by the Office of the State Fire Marshal as a major cause of wildfire spread.California Senate Bill 12. The California Senate Bill (SB) 12 regulation establishes new rules for construction of industrial, commercial, and residential projects to improve fire safety and prevention. These regulations apply to building materials that are more fire-resistant and defensible space incorporated into the design of projects.

Assembly Bill 2948. In response to the growing statewide concern of hazardous waste management, AB 2948 enacted legislation authorizing local governments to develop comprehensive hazardous waste management plans. The intent of each plan is to ensure that adequate treatment and disposal capacity is available to manage the hazardous waste generated within its jurisdiction.

California Building Code. Chapter 7A of the CBC focuses primarily on preventing ember penetration into homes, a leading cause of structure loss from wildfires, through mitigating former structural vulnerabilities. Construction techniques and materials include roofs, eaves, exterior walls, vents, appendages, windows, and doors and result in hardened structures that have been proven to perform at high levels (resist ignition) during the typically short duration of exposure to burning vegetation from wildfires.

4.9.2.3 Local/Regional Regulations
City of Fairfield General Plan57
• Goal HS-5. Minimize health and safety impacts related to the use, storage, manufacture, and transport of hazardous materials.
○ Policy HS-5.2. Hazardous Material Review. Involve the Fire Department and Solano County Department of Resource Management in the review process for all projects located on commercial- and industrial-designated properties where potential for hazardous materials use has been identified.
○ Policy HS-5.3. Hazard Mitigation and Risk Assessment. Continue to address potential concerns associated with the transport, storage, use and disposal of hazardous materials and waste through the environmental review process and minimize risk through the use of proper mitigation measures. Require risk assessments for all commercial and industrial uses 57 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).

Page 272 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-129 that store, use and produce hazardous materials and are adjacent to residential areas and immobile populations such as schools, hospitals, convalescent homes, prisons etc. ○ Policy HS-5.4. Hazardous Materials Accidents. Seek to prevent industrial and transportation accidents involving hazardous materials. Continue to enforce regulations limiting truck travel through certain areas of the city to designated routes. Develop an assessment plan to determine railway points of vulnerability to more accurately predict areas of which would be impacted most during railway damage events.
○ Policy HS-5.5. Solano County Hazardous Waste Management. Support the Solano County Certified Unified Program Agency Operational Area Plan for Emergency Response to Hazardous Materials Incidents and the policies, objectives and programs contained therein to the extent that they are applicable to the City of Fairfield.

City of Vacaville
• Goal SAF-6. Minimize risks from the harmful effects of hazardous materials and waste.

4.9.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way and would require consistent or similar construction and operational maintenance activities. Therefore, both alignments are presumed to have similar impacts to hazards and hazardous materials and are analyzed together in this section.
a. Would the project create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? Less Than Significant Impact. The NBRWTP is an existing public utility facility that routinely uses and stores hazardous materials associated with potable water treatment, including aluminum sulfate, sodium hypochlorite, polymers, and other treatment chemicals. These materials are managed in accordance with applicable regulatory requirements, including secondary containment, spill prevention, and emergency response procedures under an approved HMBP and oversight by the Solano County Certified Unified Program Agency (CUPA).

Implementation of the Project would increase treatment capacity at the facility, which would correspondingly increase the quantity and frequency of hazardous materials delivered, stored, and used on-site. However, the types of chemicals used would remain consistent with existing operations, and no new classes of hazardous materials would be introduced.

The increased use and transport of treatment chemicals would occur within an existing regulatory and operational framework that is specifically designed to manage such materials safely. The facility

Page 273 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -130 would continue to comply with all applicable federal, State, and local regulations governing hazardous materials, including requirements under Title 22 of the CCR, OSHA standards, and USDOT regulations for hazardous material transport.

In addition, the facility’s HMBP would be updated as necessary to reflect any changes in chemical quantities, storage conditions, or emergency response procedures. Secondary containment systems, storage infrastructure, and operational controls would be designed or expanded to accommodate increased volumes in accordance with applicable safety standards. Routine hazardous waste generation would also increase proportionally; however, such waste would continue to be managed and disposed of through licensed haulers and permitted facilities in compliance with regulatory requirements.

The Project would include provisions for ozone treatment of raw water at one or both existing raw water intake locations within the NBRWTP boundary to protect plant facilities from potential damage or loss of treatment capacity associated with golden mussel growth. Improvements may include small-diameter ozone conveyance piping, side-stream pumping, ozone injection equipment, ozone gas and residual monitoring equipment, associated electrical, instrumentation and controls, and access provisions. Existing raw-water pipeline components may also be modified or replaced, as necessary, for compatibility with elevated ozone exposure.

Ozone is currently generated and used as part of the NBRWTP water treatment process.

Accordingly, the proposed improvements would extend an existing treatment process to the raw water intake system rather than introduce a new treatment chemical or process to the facility.

Ozone generation, conveyance, injection, and monitoring equipment would be designed, installed, operated, and maintained in accordance with applicable regulatory requirements and NBRWTP operating and safety procedures. Gas and residual monitoring equipment and associated controls would be incorporated into the system, as necessary, to provide for safe operation.Although the Project would result in an incremental increase in hazardous material transport and on-site storage, these activities would remain within the scope of existing, well-regulated industrial operations and would not substantially increase the risk of exposure to the public or environment. The facility is in an area with limited nearby sensitive receptors and adequate buffering, further reducing potential exposure risks.

The Project would result in an incremental increase in the transport, use, and storage of hazardous materials; however, because these activities would remain consistent with existing operations and subject to established regulatory controls and oversight, the Project would not create a significant hazard to the public or the environment. Impacts would be less than significant. b. Would the project create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment?
Less Than Significant Impact. The NBRWTP currently stores and uses hazardous materials typical of water treatment operations, including sodium hypochlorite, aluminum sulfate, and polymers. These materials are managed under strict regulatory oversight, including compliance with an approved

Page 274 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-131 HMBP, secondary containment requirements, and emergency response procedures enforced by the Solano County CUPA.

Implementation of the Project would increase treatment capacity, which would correspondingly increase the quantities of hazardous materials stored and handled on-site. This increase could result in a greater potential for accidental release scenarios, such as:
• Spills or leaks during chemical delivery
• Equipment or tank failure
• Accidental releases during handling or transfer
• Construction-related incidents involving fuels, oils, or other hazardous materials During construction, the use of fuels, lubricants, and other hazardous materials could result in accidental spills; however, these materials would be handled in accordance with applicable regulations and standard construction BMPs, including proper storage, spill containment, and cleanup procedures.

During operation, although hazardous materials would continue to be managed within a controlled facility setting, the increased volume of chemicals represents a potential increase in the magnitude of a reasonably foreseeable accidental release. However, the facility is designed and operated to prevent and respond to such incidents through:
• Secondary containment systems for all bulk chemical storage • Automated monitoring and control systems
• Routine inspection and maintenance programs
• Employee training and emergency response procedures under the HMBP • Oversight by CUPA and other regulatory agencies
In addition, regulatory policy and plan compliance would be implemented to further reduce the risk of accidental release and ensure rapid response in the event of an incident. These measures include preparation and implementation of a Spill Prevention and Response Plan or equivalent procedures during construction, adherence to HMBP requirements during operation, and proper handling, storage, and disposal of hazardous materials.

With implementation and compliance with applicable regulatory requirements, the likelihood and severity of accidental releases would be minimized, and potential impacts to the public and environment would be reduced.

Although the Project would involve increased quantities of hazardous materials and associated potential for accidental release, implementation of mitigation measures and compliance with existing regulatory requirements would reduce impacts to a less than significant level.

Page 275 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -132 c. Would the project emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? Less Than Significant Impact. The NBRWTP is an existing public utility facility that routinely handles hazardous materials associated with water treatment operations, including sodium hypochlorite, aluminum sulfate, and related chemicals. These materials are managed in accordance with applicable regulatory requirements, including preparation and implementation of an HMBP, secondary containment systems, and oversight by the Solano County CUPA.

A review of the Project area indicates that there are no schools within 0.25 mile of the Project site or either pipeline alignment. However, the Project would continue to handle hazardous materials similar to existing conditions, with a potential increase in quantity associated with expanded treatment capacity. However, these materials would remain stored and handled within a controlled facility environment designed to prevent release and minimize exposure. The Project would not introduce new types of acutely hazardous materials beyond those already in use, nor would it result in routine emissions of hazardous substances that could affect off-site receptors.

In addition, hazardous materials transport would occur along established routes and in compliance with USDOT regulations, and facility operations would continue to comply with all applicable federal, State, and local requirements governing hazardous materials management.

Given the controlled nature of hazardous materials handling, existing regulatory oversight, and the lack of a pathway for routine exposure to nearby receptors, including schools, the Project would not result in substantial hazardous emissions or handling conditions that would adversely affect schools.

The Project would not emit hazardous emissions or handle hazardous materials in a manner that would pose a significant risk to nearby schools. Impacts would be less than significant. d. Would the project be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or the environment?
Less Than Significant Impact. Government Code Section 65962.5 requires the CalEPA to compile and maintain lists of hazardous materials release sites and cleanup sites identified by State agencies. A review of the DTSC EnviroStor and SWRCB GeoTracker databases indicates that the Project is not included on a list of hazardous material sites compiled pursuant to Government Code Section 65962.5. Therefore, the Project is not identified as a known hazardous materials release site or active cleanup location.

Although the Project is not formally listed pursuant to Government Code Section 65962.5, there is potential for localized soil contamination within portions of the Peabody Road Pipeline Alignment.

Previous construction activities and environmental investigations in the vicinity have documented the presence of creosote and/or arsenic impacted soils near the Project. As a result, excavation and trenching activities associated with the Peabody Road Pipeline Alignment could encounter contaminated soils during construction. No known hazardous or contaminated soils have been identified along the Linear Trail alignment based on available environmental records.

Page 276 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-133 Exposure to contaminated soil during construction could pose a potential hazard to construction workers and the environment if not properly managed. In the event contaminated soil or other hazardous materials are encountered, work within the affected area would cease until the extent and nature of contamination are evaluated by a qualified environmental professional. Any contaminated materials encountered would be characterized, handled, transported, and disposed of in accordance with applicable federal, State, and local regulations, including requirements of DTSC and the RWQCB. Appropriate health and safety measures, including worker protection procedures, soil management protocols, and dust control measures, would also be implemented to minimize exposure risks to workers, the public, and the environment.

Because the Project is not included on a hazardous material site list compiled pursuant to Government Code Section 65962.5, and because any potentially contaminated soils encountered during construction would be managed in accordance with applicable regulatory requirements, impacts would be less than significant.
e. Would the project be located within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project result in a safety hazard or excessive noise for people residing or working in the project area? Less Than Significant with Mitigation Incorporated. The Project is located within the Airport Influence Area for Travis Air Force Base and is subject to the Travis AFB LUCP58. The NBRWTP is located within Compatibility Zone D and the Outer Perimeter Wildlife Hazard Area. Compatibility Zone D generally permits utility and public facility uses provided they comply with applicable airport compatibility criteria. The LUCP also provides that new or expanded land uses within the Outer Perimeter that have the potential to attract wildlife movement resulting in bird strikes may be required to prepare a Wildlife Hazard Analysis (WHA) 59.

The Project consists of expansion of an existing regional water treatment facility and construction of an underground treated-water transmission pipeline. The Project would not introduce residential or other noise-sensitive land uses, substantially increase occupancy, or construct structures that would interfere with navigable airspace or aircraft operations. The underground transmission pipeline would not create aviation hazards or alter existing aircraft flight patterns.

Although the Project is not anticipated to create substantial new wildlife attractants, expansion of an existing water treatment facility within the Outer Perimeter Wildlife Hazard Area warrants review for consistency with the LUCP. Accordingly, implementation of Mitigation Measure HAZ-1 would ensure that the Project is reviewed by the Airport Land Use Commission and that a WHA is prepared if determined necessary. With implementation of Mitigation Measure HAZ-1, the Project would be consistent with the Travis Air Force Base Airport Land Use Compatibility Plan and would not result in 58 County of Solano Department of Resource Management. 2024. Land Use Compatibility Plan for Travis Air Force Base, Figure 1 Compatibility Zones. August 8. 59 County of Solano Department of Resource Management. 2024. Land Use Compatibility Plan for Travis Air Force Base, Figure 4 Wildlife Hazard Analysis Boundaries. August 8.

Page 277 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -134 a safety hazard for aircraft operations or expose people working in the Project area to excessive aircraft noise. Therefore, impacts would be less than significant with mitigation incorporated.

Workers at the NBRWTP would continue to experience aircraft overflight noise consistent with existing conditions; however, the Project would not substantially increase the number of workers exposed to aircraft noise nor alter the existing noise environment. With implementation of Mitigation Measure HAZ-1, the Project would be consistent with the Travis AFB Airport Land Use Compatibility Plan and would not result in a safety hazard or excessive aircraft noise exposure for people residing or working within the Project area. Therefore, impacts would be less than significant with mitigation incorporated.
f. Would the project impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan?
Less Than Significant Impact. The Project is within Fairfield and is served by an established roadway network, including local roads and regional connectors that support emergency access and evacuation. The Project consists of expansion of an existing water treatment facility and construction of an underground transmission pipeline, portions of which would be installed within or adjacent to existing roadways and utility corridors.

During construction, temporary impacts on traffic and access could occur due to lane closures, equipment staging, and trenching activities associated with pipeline installation. These temporary disruptions could affect local circulation and, if not properly managed, could interfere with emergency vehicle access or evacuation routes. However, construction activities would be conducted in accordance with an approved Traffic Control Plan, which would be designed to:
• Maintain emergency vehicle access at all times
• Coordinate with local emergency service providers (e.g., fire, police, and emergency medical services)
• Provide appropriate detours and signage
• Minimize disruption to traffic flow to the extent feasible In addition, the Project would be required to comply with applicable City requirements for construction permitting and traffic management, including coordination with the City of Fairfield Public Works Department and emergency responders.

Operation of the Project would not result in permanent changes to roadway configurations, access routes, or circulation patterns. The expanded facility would continue to function as an existing utility and would not generate traffic volumes or site conditions that would impede emergency response or evacuation.

Because construction-related disruptions would be temporary and managed through standard traffic control and coordination measures, and because Project operations would not change any roadway configurations or add additional vehicles on the roadway and therefore would not interfere with emergency access or evacuation routes, s, the Project would not impair implementation of an adopted emergency response or evacuation plan. The Project would not impair implementation of

Page 278 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-135 or physically interfere with an adopted emergency response or emergency evacuation plan. Impacts would be less than significant.
g. Would the project expose people or structures, either directly or indirectly, to a significant risk of loss, injury or death involving wildland fires?
Less Than Significant with Mitigation Incorporated. The Project is in a developed area of Fairfield and is currently occupied by an existing water treatment facility and associated infrastructure. The surrounding area is characterized by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential use. The site is not within a high or very high fire hazard severity zone as designated by the CAL FIRE, nor is it within a WUI area characterized by dense vegetation and elevated wildfire risk.

Implementation of the Project would involve expansion of an existing facility and installation of an underground pipeline within previously disturbed areas, roadways, and utility corridors. The Project would not introduce new habitable structures or sensitive populations into areas of wildfire risk, nor would it increase fuel loads or create conditions that would exacerbate wildfire hazards.

During construction, the use of equipment and vehicles could present a minor, temporary ignition risk; however, contractors would be required to implement standard fire prevention measures, such as maintaining spark arrestors, having fire extinguishers on-site, and complying with applicable fire safety regulations. Mitigation Measures WF-1 and WF-2 found in Section 4.20, would be required, which entails developing pre-construction defensible space and providing adequate water sources during construction activities. These measures would minimize the potential for construction-related ignition.

Operation of the expanded facility would not involve activities that would increase wildfire risk, and the Project would not alter emergency access or firefighting capabilities. In fact, water treatment and distribution infrastructure can support fire suppression efforts by maintaining reliable water supply.

Because the Project would be in a developed area with low wildfire risk, it would not introduce new wildfire hazards and would not increase exposure of people or structures to wildfire, the Project would not result in a significant wildfire-related impact. Additionally, Mitigation Measures WF-1 and WF-2 (located in Section 4.20) will be implemented to further reduce the potential for construction related wildfire risk. With the implementation of mitigation measures, impacts would be less than significant.

4.9.4 Mitigation Measures
Mitigation Measure HAZ-1 Wildlife Hazard Analysis. Prior to issuance of grading or building permits, the City will submit the Project to the Solano County Airport Land Use Commission for consistency review with the Travis Air Force Base Airport Land Use Compatibility Plan, as applicable. If the Airport Land Use Commission, in coordination with Travis Air Force Base, determines that the Project constitutes a new or

Page 279 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -136 expanded land use with the potential to attract hazardous wildlife movement within the Outer Perimeter of the Airport Influence Area, the applicant will prepare a Wildlife Hazard Analysis in accordance with the Travis Air Force Base Airport Land Use Compatibility Plan and applicable Federal Aviation Administration guidance. Any recommendations or measures identified in the approved Wildlife Hazard Analysis will be incorporated into the final Project design, construction, and operation, as applicable, to minimize the potential for wildlife hazards to aircraft operations.

Page 280 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-137

4.10 HYDROLOGY AND WATER QUALITY
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality?
b. Substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the
project may impede sustainable groundwater management
of the basin?
c. Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious
surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or off-site; ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite;
iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of
polluted runoff; or
iv. Impede or redirect flood flows?
d. In flood hazard, tsunami, or seiche zones, risk release of pollutants due to project inundation?
e. Conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?

4.10.1 Baseline Conditions

4.10.1.1 Climate
The City and the surrounding Solano County region experience a Mediterranean climate characterized by hot, dry summers and mild, wet winters. Average annual precipitation is approximately 23 inches, occurring primarily between November and March. Summer temperatures often exceed 90 °Fahrenheit, while winter lows typically remain above freezing 60. Prevailing winds are influenced by the San Francisco Bay–Sacramento Delta air corridor, which contributes to moderate air movement and good dispersion of air pollutants and humidity. The regional climate supports a combination of grassland, agricultural, and urban land uses typical of the lower Coast Range foothills and Delta transition zone.
61 60 NOAA National Centers for Environmental Information (NCEI). n.d. Climate Data Online and Climate at a Glance. Website: https://www.ncei.noaa.gov/ 61 U.S. Climate Data. n.d. Climate Fairfield, California. Website: https://www.usclimatedata.com/climate/ fairfield/california/united-states/usca0364

Page 281 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -138

4.10.1.2 Topography
The Project site is on the eastern periphery of Fairfield, within a gently sloping landscape that transitions from the Vaca Mountains to the west toward the Suisun Marsh and Suisun Bay to the southeast. Elevations for the Project range from approximately 50 to 100 feet above mean sea level,
62 and the terrain is characterized by low-gradient slopes that generally direct surface drainage toward the east and southeast. The area’s flat topography, combined with its engineered development and storm drainage infrastructure, limits the potential for erosion or slope instability under current conditions.

4.10.1.3 Surface Water Resources
The Project area is within the Suisun Creek Hydrologic Subarea of the San Pablo Bay Hydrologic Basin. No natural perennial streams traverse the Project site; however, engineered stormwater conveyance facilities and utility drainage features are present within and around the existing NBRWTP property. Surface drainage in the vicinity is directed to man-made channels and detention basins that ultimately discharge to the Suisun Marsh, which discharges to Suisun Bay, Carquinez Strait, and San Pablo Bay.

The two main surface water features in the vicinity of the Project site include Putah South Canal and Union Creek. The Putah South Canal is a major component of the Solano Project and serves as a regional water conveyance facility delivering water supplies to Solano County communities and agricultural users. Union Creek is a local drainage feature that conveys stormwater runoff southward toward the Suisun Marsh and Suisun Bay system.

The Linear Trail Pipeline Alignment would generally follow the existing 30-inch transmission main corridor extending north from the NBRWTP along the Putah South Canal and former railroad corridor known as the Linear Trail before connecting to Vacaville’s distribution system near Peabody Road and Foxboro Parkway. This alignment traverses several open space, utility corridor, and undeveloped areas and includes crossings or close proximity to multiple water features and drainage resources, including the Putah South Canal, Union Creek, associated stormwater detention facilities, agricultural drainage features, and smaller ephemeral drainage channels within the corridor. Portions of the alignment are adjacent to or within areas that ultimately drain toward the Suisun Marsh and Suisun Bay watershed system.

The Peabody Road Pipeline Alignment would extend west from the NBRWTP to Peabody Road and continue north within or adjacent to the existing roadway corridor toward Vacaville. This alignment would primarily traverse developed transportation and utility corridors characterized by existing roadway infrastructure, agricultural land uses, drainage facilities, and nearby residential development. Hydrologic features potentially crossed or affected by this alignment include the Putah South Canal crossing near the southern portion of the route, multiple roadside drainage ditches, culverts, storm drain facilities, agricultural drainage conveyances, and localized runoff 62 Solano County GIS and Mapping Services. n.d. Topography, elevation, and drainage datasets. https://www.solanocounty.com (accessed February 2026).

Page 282 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-139 channels associated with the developed roadway network. The alignment would also remain within the broader Suisun Marsh watershed drainage area.

4.10.1.4 Surface Water Quality
Surface water quality in the region is influenced by urban runoff, agricultural activities, and industrial discharges regulated under the San Francisco Bay RWQCB Basin Plan. The NBRWTP operates under a National Pollutant Discharge Elimination System (NPDES) permit for treated water discharges and complies with applicable effluent standards and monitoring requirements. The surrounding stormwater drainage system conveys runoff that may contain low concentrations of sediment, nutrients, and hydrocarbons typical of developed utility and roadway areas. Baseline surface water quality conditions are considered regulated and monitored, with no existing impairment sources directly associated with the Project.

Regional water quality concerns associated with downstream receiving waters include dissolved oxygen impairments, mercury-related water quality concerns, and broader watershed management issues within the Suisun Marsh ecosystem, which is subject to ongoing TMDL implementation efforts. Although Putah Creek and the Putah South Canal generally support high-quality municipal and agricultural water supplies, watershed studies have identified ecological and hydrologic challenges associated with altered flow regimes, erosion, sediment transport, and habitat conditions within the broader Putah Creek watershed.

4.10.1.5 Groundwater Resources
The Project area overlies the Suisun–Fairfield Groundwater Subbasin of the Solano Subbasin (Basin No. 5-21.67), as defined by the California Department of Water Resources. 63 Groundwater in this
area generally occurs at moderate depths (approximately 50–100 feet below ground surface) and flows southeast toward Suisun Marsh. The NBRWTP does not rely on groundwater for operational supply; instead, all raw water is imported via the North Bay Aqueduct. Regional groundwater resources are managed under the Solano Subbasin Groundwater Sustainability Plan, which identifies stable water levels and no widespread overdraft conditions. The baseline groundwater condition is therefore characterized by stable levels and limited local extraction activity.

4.10.1.6 Groundwater Quality
Regional groundwater quality is generally good to moderate, with localized areas of elevated total dissolved solids (TDS) and nitrate concentrations resulting from agricultural and urban influences.

The Project itself does not contain wells or on-site groundwater extraction infrastructure. Previous investigations and regulatory databases (e.g., GeoTracker, EnviroStor) show no known groundwater contamination within or adjacent to the NBRWTP property. Accordingly, the baseline groundwater quality is considered unimpaired and typical of regional background conditions. 63 California Department of Water Resources. 2026. California’s Groundwater Bulletin 118, Basin Boundaries Data Viewer. Website: https://water.ca.gov/programs/groundwater-management/bulletin-118 (accessed May 6, 2026).

Page 283 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -140

4.10.1.7 Flooding
According to the FEMA Flood Insurance Rate Map (FIRM Panel 06095C0287E, effective May 4, 2009), the Project is located outside of the 100-year and 500-year flood hazard zones (Zone X).

Nearby low-lying areas to the south and east transition toward the Suisun Marsh and are more susceptible to localized ponding during extreme storm events. However, the NBRWTP site is elevated relative to surrounding drainages and has no history of flooding or inundation under current conditions. The existing drainage infrastructure and site grading provide effective stormwater management within the facility boundary.

4.10.1.8 Stormwater and MS4 Compliance
The NBRWTP and surrounding City of Fairfield are regulated under the Municipal Regional Stormwater NPDES Permit (MS4) Permit issued to the City under the San Francisco Bay RWQCB (Order Nos. R2-2022-0018 and Amendment R2-2023-0019, NPDES Permit No. CAS612008).

Stormwater from the site is conveyed through a network of storm drains and ditches that connect to regional MS4 systems operated by the City and the Fairfield-Suisun Sewer District. The facility implements BMPs for stormwater pollution prevention, including covered chemical storage, secondary containment, and paved, graded areas to control runoff. Routine maintenance and inspection activities minimize potential for pollutant discharge during storm events. The baseline condition therefore reflects active compliance with MS4 requirements and NPDES stormwater management standards, resulting in a well-controlled runoff environment typical of established public utility facilities.

4.10.2 Regulatory Requirements

4.10.2.1 Federal Regulations
Clean Water Act. In 1972, Congress amended the Federal Water Pollution Control Act, making the addition of pollutants to the waters of the United States from any point source unlawful unless the discharge is in compliance with a NPDES permit. Known today as the CWA, Congress has amended it several times. The objective of the CWA is “to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters.” In the 1987 amendments, Congress directed dischargers of storm water from municipal and industrial/construction point sources to comply with the NPDES permit scheme. Important CWA sections are:
• Sections 303 and 304 require states to promulgate water quality standards, criteria, and guidelines and have those standards approved by the USEPA. Water quality standards consist of designated beneficial uses for a particular waterbody (e.g., wildlife habitat, agricultural supply, fishing), along with water quality criteria necessary to support those uses. Water quality criteria are set concentrations or levels of constituents (e.g., lead, suspended sediment, and fecal coliform bacteria) or narrative statements that represent the quality of water that support a particular use. Because California had not established a complete list of acceptable water quality criteria for toxic pollutants, the USEPA Region IX established numeric water quality criteria for toxic constituents in the form of the California Toxics Rule (CTR).

When designated beneficial uses of a particular waterbody are being compromised by water quality, Section 303(d) of the CWA requires identifying and listing that waterbody as impaired.

Page 284 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-141 Once a waterbody has been deemed impaired, a total maximum daily load (TMDL) must be developed for each impairing water quality constituent. A TMDL is an estimate of the total load of pollutants from point, nonpoint, and natural sources that a waterbody may receive without exceeding applicable water quality standards (often with a “factor of safety” included, which limits the total load of pollutants to a level well below that which could cause the standard to be exceeded). Once established, the TMDL is allocated among current and future dischargers into the waterbody.

The SWRCB, in compliance with Section 303(d) of the CWA, prepared the proposed 2024 list of impaired waterbodies in California. The SWRCB approved the 2024 California Integrated Report (CWA Section 303(d) List/305(b) Report on February 6, 2024, and the EPA partially approved the 2024 California Integrated Report on December 13, 2024. The 303(d) list includes a priority schedule for the development of TMDL implementation for each contaminant impacting the waterbody. The current list of impairments for the Project receiving waters are provided in Section 4.10.1.3.
• Section 401 Certification requires an applicant for a federal license or permit to conduct any activity that may result in a discharge to waters of the United States to obtain certification from the State that the discharge will comply with other provisions of the act. (This is most frequently required in tandem with a Section 404 permit request and is discussed further below.) • Section 402 establishes the NPDES, a permitting system for the discharges (except for dredge or fill material) of any pollutant into waters of the United States. The EPA delegated the implementation and administration of the NPDES program to the SWRCB. The SWRCB established nine RWQCBs. The SWRCB enacts and enforces the federal NPDES program and all water quality programs and regulations that cross regional boundaries. The nine RWQCBs enact, administer, and enforce all programs, including NPDES permitting, within their jurisdictional boundaries. Section 402(p) requires permits for discharges of stormwater from industrial, construction, and MS4s. To comply with the MS4 permits, storm water pollution controls must be implemented for construction and operational activities that discharge either directly to surface waters or indirectly through separate municipal storm drains. Pollution control is achieved by establishing engineering measures that have been designed, tested, and successfully implemented throughout the past decades, such as detention basins and sediment traps, during both the construction period and the operational phases of a project.

Direct discharges of pollutants into waters of the United States are not allowed except in accordance with the NPDES program established in Section 402 of the CWA. • Section 404 establishes a permit program for the discharge of dredge or fill material into waters of the United States. This permit program is administered by the United States Army Corps of Engineers (USACE).

Pursuant to Section 404 of the CWA, the USACE regulates discharges of dredged or fill material into waters of the United States. These waters include wetlands and non-wetland bodies of water that meet specific criteria, including a direct or indirect connection to interstate commerce. The USACE regulatory jurisdiction pursuant to Section 404 of the CWA is founded on

Page 285 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -142 a connection, or nexus, between the waterbody in question and interstate commerce. This connection may be direct (through a tributary system linking a stream channel with traditional navigable waters used in interstate or foreign commerce) or may be indirect (through a nexus identified in the USACE regulations). The USACE typically regulates as non-wetland waters of the United States any body of water displaying an ordinary high water mark (OHWM). To be considered a jurisdictional wetland under Section 404, an area must possess three wetland characteristics: hydrophytic vegetation, hydric soils, and wetland hydrology. Each characteristic has a specific set of mandatory wetland criteria that must be satisfied in order for that particular wetland characteristic to be met. A project-specific discussion regarding Section 404 issues is provided in Section 4.4, Biological Resources, in this document).

National Flood Insurance Act. Congress acted to reduce the costs of disaster relief by passing the National Flood Insurance Act of 1968 and the Flood Disaster Protection Act of 1973. The intent of these acts was to reduce the need for large, publicly funded flood control structures and disaster relief efforts by restricting development in floodplains. The Federal Emergency Management Agency (FEMA) administers the National Flood Insurance Program (NFIP), which provides flood insurance, floodplain management, and flood hazard mapping. Communities subject to flood hazards voluntarily participate in the NFIP by adopting and enforcing floodplain management ordinances to reduce the potential for flood damage. In turn, the NFIP offers federally funded flood insurance to homeowners, renters, and business owners in participating communities. Under this program, FEMA produces Flood Insurance Rate Maps (FIRMs) that identify properties and buildings in flood insurance risk areas. Flood hazards related to storm events are generally described in terms of 100- or 500-year floods. These are floods that, respectively, have 1 percent and 0.2 percent chance of occurring every year.

4.10.2.2 State Regulations
Porter-Cologne Water Quality Control Act of 1970. The federal CWA places the primary responsibility for the control of water pollution and planning the development and use of water resources with the states, although it does establish certain guidelines for the states to follow in developing their programs.California’s primary statute governing water quality and water pollution is the Porter-Cologne Water Quality Control Act of 1970 (Porter-Cologne Act). The Porter-Cologne Act grants the SWRCB and the nine RWQCBs broad powers to protect water quality and is the primary vehicle for the implementation of California’s responsibility under the federal CWA. The Porter-Cologne Act grants the SWRCB and RWQCBs the authority and responsibility to adopt plans and policies, to regulate discharges to surface water and groundwater, to regulate waste disposal sites, and to require cleanup of discharges of hazardous materials and other pollutants. The Porter-Cologne Act also establishes reporting requirements for unintended discharges of any hazardous substance, sewage, oil, or petroleum product.

Each RWQCB must formulate and adopt a water quality plan for its region. The regional plans are to conform to the policies set forth in the Porter-Cologne Act and established by the SWRCB in its State water policy. The Porter-Cologne Act also provides that an RWQCB may include in its region a regional plan with water discharge prohibitions applicable to particular conditions, areas, or types of waste. Fairfield, including the Project site, is within the jurisdictional boundaries of the San Francisco Bay RWQCB (Region 2).

Page 286 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-143 State Water Resources Control Board and Regional Water Quality Control Boards. The SWRCB adjudicates water rights, sets water pollution control policy, issues water board orders on matters of statewide application, and oversees water quality functions throughout the State by approving Basin Plans, TMDLs, and NPDES permits. RWQCBs are responsible for protecting beneficial uses of water resources within their regional jurisdiction using planning, permitting, and enforcement authorities to meet this responsibility.

National Pollutant Discharge Elimination System Program. Section 402(p) of the CWA requires the issuance of NPDES permits for five categories of stormwater dischargers, including MS4s. The EPA defines an MS4 as “any conveyance or system of conveyances (roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, human-made channels, and storm drains) owned or operated by a state, city, town, county, or other public body having jurisdiction over stormwater, which are designed or used for collecting or conveying stormwater.” The SWRCB or the RWQCB issues NPDES permits for 5 years, and permit requirements remain active until a new permit has been adopted.

Municipal Separate Storm Sewer System. The Municipal Stormwater Permitting Program regulates stormwater discharges from MS4s. The NPDES MS4 permits are issued in two phases by the SWRCB and the RWQCBs. Phase I MS4 Permits are issued to medium municipalities (serving between 100,000 and 250,000 people) and large municipalities (serving more than 250,000 people). Most of these permits are issued to a group of co-permittees encompassing an entire metropolitan area. The Phase II MS4 Permits are issued to smaller municipalities (populations of less than 100,000 people).

The Phase II Small MS4 Permit covers Phase II permittees statewide and became effective on July 1, 2013. The Phase I and Phase II MS4 Permits require the permittees to develop a stormwater management program and individual dischargers to develop and implement a Storm Water Management Plan.

California Toxics Rule. As stated previously, because California had not established a complete list of acceptable water quality criteria for toxic pollutants, EPA Region IX established numeric water quality criteria for toxic constituents in the form of the CTR. The CTR provides water quality criteria for certain potentially toxic compounds for inland surface waters, enclosed bays, estuaries, and waters designated for human health or aquatic life uses. The CTR is often used by the RWQCBs when establishing water quality objectives and TMDLs. Although the CTR criteria do not apply directly to discharges of storm water runoff, they are used as benchmarks for toxics in urban runoff. The CTR is used as a benchmark to evaluate the potential ecological impacts of storm water runoff to receiving waters. The CTR establishes acute and chronic surface water quality standards for certain waterbodies. Acute criteria provide benchmarks for the highest permissible concentration below which aquatic life can be exposed for short periods of time without negative effects. Chronic criteria provide benchmarks for an extended period of time (i.e., 4 days or more) without negative effects.

The acute CTR criteria have a shorter relevant averaging period (less than 4 days) and provide a more appropriate benchmark for comparison for storm water flows.

General Construction Activity Storm Water Permit. The General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities, Order No. 2022-0057-DWQ, NPDES No. CAS000002 (Construction General Permit), adopted by the SWRCB, regulates construction activity that includes clearing, grading, and excavation resulting in soil disturbance of at least 1 acre

Page 287 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -144 of total land area. The Construction General Permit authorizes the discharge of stormwater to surface waters from construction activities. The Construction General Permit requires that all developers of land where construction activities will occur over more than 1 acre do the following:
• Complete a Risk Assessment to determine pollution prevention requirements pursuant to the three risk levels established in the General Permit;
• Eliminate or reduce non-stormwater discharges to storm sewer systems and other waters of the United States;
• Develop and implement a SWPPP that specifies BMPs that will reduce pollution in stormwater discharges to the Best Available Technology/Economically Achievable/Best Conventional Pollutant Control Technology standards;
• Perform inspections and maintenance of all BMPs; and
• Conduct stormwater sampling, if required based on risk level.

To obtain coverage under the Construction General Permit, a project applicant must electronically file all permit registration documents with the SWRCB prior to the start of construction. Permit registration documents must include a:
• Notice of Intent
• Risk Assessment
• Site map
• SWPPP
• Annual fee
• Signed certification statement
Typical BMPs contained in SWPPPs are designed to minimize erosion during construction, stabilize construction areas, control sediment, and control pollutants from construction materials. The SWPPP must also include a discussion of the program to inspect and maintain all BMPs.

Cobey-Alquist Flood Plain Management Act (Sections 8000–9651 of the California Water Code).

The Cobey-Alquist Flood Management Act states that a large portion of land resources of the State of California is subject to recurrent flooding. The public interest necessitates sound development of land use, as land is a limited, valuable, and irreplaceable resource, and the floodplains of the State are a land resource to be developed in a manner that, in conjunction with economically justified structural measures for flood control, would result in prevention of loss of life and of economic loss caused by excessive flooding. The primary responsibility for planning, adoption, and enforcement of land use regulations to accomplish floodplain management rests with local levels of government. It is policy of the State of California to encourage local government to plan land use regulations to accomplish floodplain management and to provide State assistance and guidance. As part of its discretionary review process, the City must determine how the project will comply with this act and not create flooding impacts on new occupied land uses.Regional/Local

Page 288 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-145 City of Fairfield General Plan64
• Goal PFS-7. Provide an adequate supply of quality water and water infrastructure to support current and future population and employment growth, as well as focused support of the region’s agritourism goals.
○ Policy PFS-7.1. Water Services. Continue to provide water service and operate all major public facilities.
○ Policy PFS-7.2. Adequate Water Supply. Acquire water supplies to serve all foreseeable needs in the General Plan with a minimum 90 percent reliability (e.g., water supplies may be deficient in no more than 10 percent of the years). Continue to pursue additional water supplies to meet the city’s future demands.
○ Policy PFS-7.3. Infrastructure Maintenance and Improvement. Maintain water storage, conveyance, and treatment infrastructure in good working condition in order to supply domestic water to all users with adequate level of service. ○ Policy PFS-7.4. Urban Water Management Plan. Encourage and actively promote long-term water conservation according to the water management programs established in the City’s Urban Water Management Plan.
○ Policy PFS-7.7. New Development. Require all new development located within City limits connect to the public water system, construct all potable water lines serving such development, and provide adequate funding for the development’s use of all potable water infrastructure and facilities.
○ Policy PFS-7.8. North Bay Regional Water Treatment Plant Expansion. Continue to work with the City of Vacaville as part of North Bay Regional Water Treatment Plant expansion efforts.

City of Vacaville General Plan
• Goal PUB-10. Ensure that a reliable water supply can be provided within the city.

4.10.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within or adjacent to previously disturbed areas, existing roadways, utility corridors, and rights-of-way within the same general hydrologic setting, and would involve similar construction methods, operational 64 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).

Page 289 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -146 characteristics, and maintenance activities. However, the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment traverse different areas and have the potential to affect different surface water features and drainage resources. Therefore, to fully evaluate the potential impacts associated with each alternative, the analysis in this section separately considers the NBRWTP in combination with the Linear Trail Pipeline Alignment and the NBRWTP in combination with the Peabody Road Pipeline Alignment. For resource areas where environmental conditions vary between the alignments and could result in different impact outcomes, the analysis distinguishes between the Trail Alignment and the Peabody Road Alignment, as appropriate. a. Would the project violate any water quality standards or waste discharge requirements or otherwise substantially degrade surface or groundwater quality? Less Than Significant Impact. The SWRCB and nine RWQCBs regulate the quality of surface water and groundwater bodies throughout California. In Fairfield, the San Francisco Bay RWQCB is responsible for implementation of the Water Quality Control Plan for the San Francisco Bay region (Basin Plan). The Basin Plan establishes beneficial water uses and water quality objectives for waterways and waterbodies within the region. Section 303(d) of the federal CWA requires that states identify waterbodies, including bays, rivers, streams, creeks, and coastal areas, that do not meet water quality standards and the pollutants that are causing the impairment. TMDLs describe the maximum amount of a pollutant that a waterbody can receive while still meeting established water quality standards. A TMDL establishes limits for pollutant discharges into impaired waterbodies.

As discussed above, engineered stormwater conveyance facilities and utility drainage features are present within and around the existing NBRWTP property. Surface drainage in the vicinity is directed to man-made channels and detention basins that drain to Union Creek and ultimately discharge to the Suisun Marsh which discharges to Suisun Bay, Carquinez Strait, and San Pablo Bay. The receiving waters for stormwater runoff from the Project are listed as impaired on the 303(d) list for several constituents. 65 The Suisun Marsh Wetlands are listed as impaired for organic enrichment/low dissolved oxygen, nutrients, salinity/total dissolved solids/chlorides, and mercury; Suisun Bay is listed as an impaired waterbody for PCBs (dioxin-like), chlordane, dieldrin, PCBs, selenium, dioxin compounds, invasive species, furan compounds, dichlorodiphenyltrichloroethane (DDT), and mercury; and the Carquinez Strait is listed as an impaired waterbody for PCBs (dioxin-like), PCBs, selenium, mercury, chlordane, dieldrin, dioxin compounds (including 2, 3, 7, 8-TCDD), invasive species, furan compounds, and DDT.

Stormwater runoff water quality is regulated by the NPDES Program (established through the federal CWA). The NPDES Program objective is to control and reduce pollutant discharges to surface waterbodies. Compliance with NPDES permits is mandated by State and federal statutes and regulations. Locally, the NPDES Program is administered by the San Francisco Bay RWQCB.

Construction activities are subject to the SWRCB NPDES General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities (CGP), Order No. 2022-0057-DWQ, 65 State Water Resources Control Board (SWRCB). 2024. 2024 California Integrated Report (Clean Water Act Section 303(d)). Website: https://www.waterboards.ca.gov/water_issues/programs/water_quality_ assessment/2024-integrated-report.html (accessed April 27, 2026).

Page 290 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-147 NPDES No. CAS000002. Any construction activity, including grading, that would result in the disturbance of 1 acre or more would require compliance with SWRCB’s CGP, which requires preparation of a SWPPP and implementation of Construction BMPs during construction activities.

Construction BMPs would include, but not be limited to, Erosion Control and Sediment Control BMPs designed to minimize erosion and retain sediment on-site as well as Good Housekeeping BMPs to prevent spills, leaks, and discharge of construction debris and waste into receiving waters.

Project operations are subject to the California Regional Water Quality Control Board San Francisco Bay Region Municipal Regional Stormwater NPDES Permit (MS4 Permit) issued to the City under the San Francisco Bay RWQCB (Order Nos. R2-2022-0018 and Amendment R2-2023-0019, NPDES Permit No. CAS612008). Provision C.3 of the MS4 Permit requires new development and redevelopment projects that would replace more than 5,000 square feet of existing impervious surfaces to include post-construction stormwater control in project designs. Under the Provision C.3 requirements, the preparation and submittal of a Stormwater Control Plan (SCP) would be required. The purpose of an SCP is to detail the design elements and implementation measures necessary to meet the post-construction stormwater control requirements of the MS4 Permit. In particular, SCPs must include Low Impact Development (LID) design measures, which reduce water quality impacts by preserving and recreating natural landscape features, minimizing imperviousness, and using stormwater as a resource rather than a waste product. Additionally, the preparation of a Stormwater Facility Operation and Maintenance Plan is required to ensure that stormwater control measures are inspected, maintained, and funded for the life of the Project.

Construction. The Project would result in the upgrade and expansion of the existing treatment facility and a new pipeline. Construction activities would result in the disturbance of approximately 20 acres of soil. Pollutants of concern during construction include sediments, trash, petroleum products, concrete waste (dry and wet), sanitary waste, and chemicals. Each of these pollutants on its own or in combination with other pollutants can have a detrimental effect on water quality. During construction activities, excavated soil would be exposed, and there would be an increased potential for soil erosion and sedimentation compared to existing conditions. In addition, chemicals, liquid products, petroleum products (e.g., paints, solvents, and fuels), and concrete-related waste may be spilled or leaked, and they have the potential to be transported via storm water runoff into receiving waters.

Because construction of the Project would disturb greater than 1 acre of soil, the Project is subject to the requirements of the CGP, which requires preparation of an SWPPP and implementation of construction BMPs during construction activities. Construction BMPs would include, but are not limited to, Erosion Control and Sediment Control BMPs designed to minimize erosion and retain sediment on-site as well as Good Housekeeping BMPs to prevent spills, leaks, and discharge of construction debris and waste into receiving waters.

Implementation of construction BMPs in accordance with the CGP would ensure that construction-related impacts to water quality would be less than significant.

Construction of the Project would require excavation to a maximum depth of 25 feet below ground surface. Pipeline installation would generally require trench excavations approximately 6 to 12 feet deep, with localized slightly deeper excavations at utility, roadway, canal, and drainage crossings. Fluctuations in groundwater levels occur seasonally and over a period of

Page 291 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -148 years due to variations in precipitation, temperature, irrigation, and other factors. Therefore, dewatering and shoring of groundwater may be required during construction activities involving excavation. Release of dewatered groundwater to surface waters can introduce total dissolved solids and other constituents to surface waters and could cause degradation of the receiving water quality. In the event that groundwater is encountered during construction and groundwater dewatering is necessary, any groundwater dewatering during excavation would be conducted in accordance with the requirements of the CGP. The CGP allows the discharge of dewatering effluent if the source of the water is uncontaminated groundwater and is properly filtered or treated using appropriate technology. The discharge of dewatering effluent is authorized under the CGP if the following conditions are met:
• The discharge does not cause or contribute to a violation of any water quality standard; • The discharge does not violate any other provision of the CGP ; • The discharge is not prohibited by the applicable Basin Plan; • The discharger has included and implemented specific BMPs required by the CGP to prevent or reduce the contact of the non-stormwater discharge with construction materials or equipment;
• The discharge does not contain toxic constituents in toxic amounts or (other) significant quantities of pollutants;
• The discharge is monitored and meets the applicable numeric action levels; and • The discharger reports the sampling information in the annual report.

If any of the above conditions are not satisfied, the discharge of dewatering effluent is not authorized by the CGP and the discharger must notify the local RWQCB to determine whether a separate NPDES permit is necessary.

Adherence with the CGP, including implementation of the required SWPPP and Construction BMPs, and dewatering requirements, would ensure construction impacts related to surface water quality standards, waste discharge requirements, and surface water quality would be less than significant, and no mitigation is required.

Operation. Operational activities associated with the Project would be similar to the existing operations at the NBRWTP. Pollutants of concern from long-term operations include pathogens (bacteria/viruses), nutrients, pesticides/herbicides, sediments/total suspended solids, trash and debris, metals, and oil and grease. The City of Fairfield is under the purview of the MS4 Permit.

Therefore, the Project would be subject to the requirements of Provision C.3 of the MS4 Permit because the Project would result in new development consisting of more than 5,000 square feet of impervious surfaces. Therefore, the preparation and implementation of an SCP, including a Stormwater Facility Operation and Maintenance Plan and implementation of LID design measures, would be required. The facility would also continue to implement BMPs for

Page 292 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-149 stormwater pollution prevention, including covered chemical storage, secondary containment, and paved, graded areas to control runoff. The NBRWTP would continue to operate under an NPDES permit for treated water discharges and would continue to comply with applicable effluent standards and monitoring requirements. Compliance with the requirements of the MS4 Permit would ensure that operation impacts to water quality would be less than significant.

Overall, construction and operation of the Project would be subject to applicable federal, State, and local water quality regulations, including the SWRCB CGP and applicable MS4 permit requirements. Compliance with these permits would require implementation of erosion and sediment controls, stormwater BMPs, good housekeeping measures, inspection and monitoring requirements, and corrective actions to prevent the discharge of pollutants to nearby waterways, including the Putah South Canal, Union Creek, roadside drainage facilities, and downstream receiving waters. Although portions of the Project are within watersheds that contain waterbodies subject to existing water quality impairments and TMDLs, the Project would not generate additional pollutant loads during construction or operation and would not result in the violation of any applicable water quality standards, waste discharge requirements, or TMDL implementation objectives. Therefore, the Project would not contribute to the degradation of surface waters or groundwater quality, and impacts would be less than significant.
b. Would the project substantially decrease groundwater supplies or interfere substantially with groundwater recharge such that the project may impede sustainable groundwater management of the basin?
Less Than Significant Impact. As discussed above in Section 4.10.1.5, the Project area overlies the Suisun–Fairfield Groundwater Subbasin of the Solano Subbasin (Basin No. 5-21.67), as defined by the California Department of Water Resources.

Construction. As discussed above, construction of the Project would require excavation to a maximum depth of 25 feet below ground surface and dewatering and shoring of groundwater may be required during construction activities involving excavation because fluctuations in groundwater levels occur seasonally and over a period of years due to variations in precipitation, temperature, irrigation, and other factors. Any dewatering would be temporary and affect only the uppermost water-bearing zone. Such dewatering would be localized and would not result in the lowering of surrounding groundwater levels and would have to comply with the CGP, as detailed above. Therefore, impacts would be less than significant.

Operation. As previously discussed, operational activities associated with the Project would be similar to the existing operations at the NBRWTP. Development of the Project would increase impervious surface area on the Project site, which would decrease on-site infiltration. As described above, the Project would be subject to the MS4 Permit and would include BMPs to collect and infiltrate stormwater at the Project site. Therefore, development of the Project would not substantially decrease the amount of stormwater that infiltrates as compared to the existing conditions. Furthermore, the NBRWTP does not rely on groundwater for operational supply; instead, all raw water is imported via the North Bay Aqueduct. Therefore, operation of the Project would not substantially decrease groundwater supplies or interfere substantially

Page 293 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -150 with groundwater recharge such that the Project may impede sustainable groundwater management of the basin.

For the reasons listed above, impacts related to the decrease of groundwater supplies or interference with groundwater recharge would be less than significant c. Would the project substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river or through the addition of impervious surfaces, in a manner which would:
i. Result in substantial erosion or siltation on- or off-site; Less Than Significant Impact. The NBRWTP improvements would occur within an existing developed water treatment facility where drainage patterns have been substantially modified by existing treatment facilities, access roads, storm drainage infrastructure, and operational areas. Project improvements would primarily involve expansion and modification of existing facilities within the developed plant footprint and would not substantially alter existing drainage patterns or the course of any stream or river. New facilities would be designed in accordance with applicable engineering standards to maintain existing drainage conveyance and site runoff management.

Construction. During construction activities, more than 1 acre of soil would be disturbed. Soil would be exposed, and drainage patterns temporarily altered during grading and other construction activities, and there would be an increased potential for soil erosion and siltation compared to existing conditions. Additionally, during a storm event, soil erosion and siltation could occur at an accelerated rate. The Project as a whole (including a pipeline alignment) would be subject to the CGP, which requires the preparation of a SWPPP to identify construction BMPs to be implemented as part of the Project to reduce impacts on water quality during construction, including those impacts associated with soil erosion and siltation. With compliance with the requirements in the CGP and implementation of construction BMPs, construction impacts related to on- or off-site erosion or siltation would be less than significant.

Operation. After the completion of Project construction, the Project would not significantly alter the existing drainage pattern of the site. As previously discussed, operational activities associated with the Project would be similar to the existing operations at the NBRWTP.

However, operation of the Project would increase the impervious surface area on the Project compared to existing conditions, which would result in a net increase in stormwater runoff that could lead to downstream erosion in receiving waters. However, as discussed above, the Project would be subject to the MS4 Permit and would include BMPs to encourage infiltration and reduce the amount of runoff from the Project in accordance with the MS4 Permit. With incorporation of LID techniques as required by the MS4 Permit, operational impacts related to on- or off-site erosion or siltation would be less than significant.

Linear Trail Pipeline Alignment.

Less Than Significant Impact. The Linear Trail Pipeline Alignment would generally follow an existing utility corridor adjacent to the Putah South Canal and former railroad corridor. Portions

Page 294 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-151 of the alignment traverse open space areas, drainage features, and undeveloped land, including areas near Union Creek and associated stormwater conveyance facilities. Construction would require trench excavation, temporary stockpiling of soil, equipment access, and localized disturbance of existing vegetation and ground cover. These activities could temporarily increase the potential for erosion and sediment transport during construction, particularly in areas adjacent to drainage features.

However, the pipeline would be installed primarily within previously disturbed utility corridors and would not permanently alter the course of any stream or river and would not substantially increase impervious surfaces beyond those associated with minor above ground appurtenances.

Following installation, roadway surfaces, drainage facilities, and disturbed areas would be restored to existing conditions. In addition, implementation of CGP requirements and Project-specific BMPs would minimize erosion, sedimentation, and stormwater runoff during construction. Because the Project would not substantially modify existing drainage patterns, drainage infrastructure, or watercourse alignments, and because erosion and sedimentation would be controlled through regulatory compliance and restoration measures, the Project would not result in substantial erosion or siltation on- or off-site. Impacts would be less than significant.

Peabody Road Pipeline Alignment.

Less Than Significant Impact. The Peabody Road Pipeline Alignment would be primarily within or adjacent to the existing Peabody Road corridor, where drainage patterns are already controlled by roadway grading, storm drain systems, roadside ditches, culverts, and other engineered drainage facilities. Construction activities would involve trench excavation within paved and previously disturbed areas and could temporarily expose soils and increase the potential for localized erosion or sedimentation near drainage facilities and roadway crossings.

The alignment would not permanently alter the course of any stream or river and would not substantially increase impervious surfaces beyond those associated with minor above-ground appurtenances. Following installation, roadway surfaces, drainage facilities, and disturbed areas would be restored to existing conditions. In addition, implementation of CGP requirements and Project-specific BMPs would minimize erosion, sedimentation, and stormwater runoff during construction. Because the Project would not substantially modify existing drainage patterns, drainage infrastructure, or watercourse alignments, and because erosion and sedimentation would be controlled through regulatory compliance and restoration measures, the Project would not result in substantial erosion or siltation on- or off-site. Impacts would be less than significant.

For the reasons listed above, construction and operational impacts related to substantial erosion or siltation on- or off-site would be less than significant.

Page 295 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -152 ii. Substantially increase the rate or amount of surface runoff in a manner which would result in flooding on- or offsite;
Less Than Significant Impact. Development of the Project would increase impervious surface area on the Project site compared to existing conditions, which could have the potential to increase the volume and rate of stormwater runoff discharged from the Project. However, as previously discussed, the Project would include LID techniques and BMPs in accordance with the MS4 Permit.

The proposed drainage facilities and BMPs needed to accommodate stormwater runoff would be appropriately sized to prevent on-site flooding. Therefore, with implementation of LID techniques as required by the MS4 Permit, the Project would not substantially increase the rate or amount of surface runoff in a manner that would result in flooding on- or off site. Impacts would be less than significant.

Linear Trail Pipeline Alignment.

Less Than Significant Impact. The Linear Trail Pipeline Alignment would generally follow an existing utility corridor adjacent to the Putah South Canal and former railroad corridor through a combination of open space and previously disturbed areas. Construction would involve temporary ground disturbance associated with trench excavation, equipment access, and staging activities; however, the pipeline itself would be installed below ground and would not result in a substantial increase in impervious surface area. Following construction, disturbed areas would be restored to existing grade and conditions, and pre-Project drainage patterns would be maintained.

Although the alignment crosses or would be adjacent to drainage features including Union Creek, the Putah South Canal, and associated stormwater conveyance facilities, the Project would be designed to maintain existing drainage conveyance and hydraulic capacity.

Construction activities would be temporary and would not result in permanent alterations to watershed boundaries, runoff pathways, or drainage infrastructure. Because the pipeline alignment would not substantially increase impervious surfaces or alter existing drainage patterns, it would not substantially increase the rate or volume of surface runoff in a manner that would result in on-site or off-site flooding. Impacts would be less than significant.

Peabody Road Pipeline Alignment.

Less Than Significant Impact. The Peabody Road Pipeline Alignment would be constructed primarily within or adjacent to the existing Peabody Road corridor, where runoff is currently managed through an established network of roadway drainage facilities, culverts, roadside ditches, and storm drain infrastructure. Construction activities would temporarily disturb roadway shoulders, paved surfaces, and adjacent disturbed areas; however, the completed pipeline would be located underground and would not substantially increase impervious surface coverage within the corridor.

Following construction, roadways, drainage facilities, and disturbed areas would be restored to pre-construction conditions. The alignment would not modify existing drainage patterns, reduce drainage conveyance capacity, or create new sources of concentrated runoff. As a result, the

Page 296 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-153 Project would not substantially increase the rate or amount of surface runoff or contribute to flooding on-site or off-site. Impacts would be less than significant. iii. Create or contribute runoff water which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff; or Less Than Significant Impact.

Stormwater Drainage System Capacity. After the completion of Project construction, the Project would not significantly alter the existing drainage pattern of the site. Operation of the Project would increase impervious surface area on the Project compared to existing conditions, which would result in a net increase in stormwater runoff that could contribute additional runoff water to existing stormwater drainage systems. However, as discussed above, the Project would include LID features and BMPs in accordance with the MS4 Permit. The proposed drainage facilities and BMPs needed to accommodate stormwater runoff would be appropriately sized such that drainage facility capacity would not be exceeded during a design storm. Therefore, the Project would not result in an exceedance of planned or existing stormwater drainage systems. Impacts would be less than significant.

Polluted Runoff. As discussed in Section 4.10.2.a above, pollutants of concern during construction include sediments, trash, petroleum products, concrete waste (dry and wet), sanitary waste, and chemicals, and each of these pollutants on its own or in combination with other pollutants can have a detrimental effect on water quality. Drainage patterns would be temporarily altered during grading and other construction activities, and construction-related pollutants could be spilled, leaked, or transported via storm runoff into adjacent drainages and downstream receiving waters. However, the Project would be required to comply with the requirements set forth by the CGP, including preparation of an SWPPP, which would specify BMPs to be implemented to control the discharge of pollutants in stormwater runoff as a result of construction activities. Therefore, construction-related impacts would be less than significant.

Expected pollutants of concern from long-term operations include pathogens (bacteria/viruses), nutrients, pesticides/herbicides, sediments/total suspended solids, trash and debris, metals, and oil and grease. As previously discussed, the implementation of LID techniques and the incorporation of operational BMPs to target pollutants of concern in accordance with the MS4 Permit would ensure that the Project would not discharge substantial sources of polluted runoff from the Project. Operation-related impacts would be less than significant. iv. Impede or redirect flood flows?
No Impact. As discussed above, the Project is outside the 100-year and 500-year flood hazard zones (Zone X) according to the FEMA FIRM (Panel 06095C0287E, effective May 4, 2009). The Project would not significantly alter the topography of the Project, which is relatively flat, and would not substantially alter drainage patterns. Because the Project would not place improvements and structures directly within a 100-year floodplain, the Project would not impede or redirect flood flows. No impact would occur.

Page 297 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -154 d. In flood hazard, tsunami, or seiche zones, would the project risk release of pollutants due to project inundation?
No Impact. Potential impacts associated with Project inundation due to flood, tsunami, or seiche are discussed below.

Flooding. According to the FEMA FIRM No. 06095C0287E, the Project is in Zone X, which is identified as an area of minimal flood hazard. Therefore, the Project would not risk release of pollutants due to Project inundation due to flood hazard. No impact would occur.

Tsunami. The Project is more than 40 miles from the Pacific Ocean. Based on the distance from the Pacific Ocean, the Project is not in a tsunami hazard zone and, therefore, would not be susceptible to impacts associated with a tsunami. The Project would not risk release of pollutants due to Project inundation from a tsunami. No impact would occur.

Seiches. Seiches are waves created in an enclosed body of water (e.g., a bay, lake, or harbor) that go up and down or oscillate and do not progress forward like standard ocean waves.

Limited isolated damage to adjacent and down-slope structures has been observed from seiches occurring in swimming pools and in small shallow lakes and ponds. Nearby enclosed bodies of water include the lake at Lake Park located southeast of the Project and the various existing and proposed basins and sludge lagoons at the Project. The Project is not downslope of any large enclosed bodies of water and, should a seiche occur at any of the small nearby enclosed bodies of water, impacts would be localized and would not risk release of pollutants at the Project site.

The facility would also continue to implement BMPs for stormwater pollution prevention, including covered chemical storage, secondary containment, and paved, graded areas to control runoff. Therefore, the Project would not risk release of pollutants due to Project inundation due to seiche. No impact would occur.
e. Would the project conflict with or obstruct implementation of a water quality control plan or sustainable groundwater management plan?
Less Than Significant Impact. In the Bay Area, including the Project site, the RWQCB is responsible for implementation of the Basin Plan, which establishes beneficial water uses for waterways and waterbodies within the region. As previously discussed, the Project would comply with existing NPDES permit requirements, including the CGP and the MS4 Permit, and would implement construction and operational BMPs to reduce pollutants of concern in stormwater runoff.

Compliance with these regulatory requirements would ensure that the Project would not degrade or alter water quality, causing the receiving waters to exceed the water quality objectives, or impair the beneficial use of receiving waters. Therefore, the Project would not result in water quality impacts that would conflict with the Basin Plan. Construction and operational impacts related to a conflict with the Basin Plan would be less than significant.

The Sustainable Groundwater Management Act (SGMA), which was enacted in September 2014, requires governments and water agencies of high- and medium-priority basins to halt overdraft of groundwater basins. The SGMA requires the formation of local Groundwater Sustainability Agencies, which are required to adopt Groundwater Sustainability Plans to manage the sustainability of the

Page 298 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-155 groundwater basins. The Project is in the Suisun-Fairfield Subbasin, which the California Department of Water Resources designates as a low priority basin. 66 Therefore, development of a Groundwater Sustainability Plan is not required for the basin associated with the Project.

As discussed above, the Project would comply with regulatory requirements including the CGP and MS4 Permit to treat pollutants in stormwater runoff during construction and operation of the Project. Compliance with these regulatory requirements would ensure that stormwater that may infiltrate during construction or operation of the Project would be treated prior to reaching groundwater. Therefore, the Project would not affect groundwater quality within the Suisun-Fairfield Subbasin. As previously stated, development of the Project would increase the impervious surface on the Project compared to existing conditions. Although development of the Project would increase the impervious surface area on the Project, which could decrease on-site infiltration, the Project would include Site LID features and BMPs that would encourage infiltration and reduce the amount of runoff from the Project, in accordance with the MS4 Permit. Therefore, the Project would not substantially impact groundwater supplies within the Suisun-Fairfield Subbasin.

The Project would not alter water supply entitlements or expand municipal service areas but would improve treatment and delivery capacity for existing and planned demands within the established service areas of Fairfield and Vacaville. Furthermore, the Project is in a low priority basin; therefore, the SGMA provisions do not apply. Impacts related to a conflict with or obstruction of a water quality control plan or sustainable groundwater management plan would be less than significant.

The Project would include provisions for ozone treatment of raw water at one or both existing raw water intake locations within the NBRWTP boundary to control golden mussel growth and maintain plant capacity. Improvements may include ozone conveyance piping, side-stream pumping, ozone injection equipment, ozone gas and residual monitoring equipment, associated electrical, instrumentation and controls, and modifications to existing raw-water pipeline components, as necessary.

Ozone is currently generated and used as part of the NBRWTP water treatment process. The proposed improvements would extend this existing treatment capability to the raw water intake system. Ozone would be injected into the raw water conveyance system as part of the treatment process and would not constitute a new direct discharge of ozone or ozone-treated water to Putah South Canal, Union Creek, groundwater, or other receiving waters. Ozone treatment and associated monitoring and controls would be designed and operated in accordance with applicable drinking water and water quality requirements.

Because the proposed improvements would occur within the existing NBRWTP boundary, would not create a new discharge to surface water or groundwater, and would be incorporated into the existing water treatment process, the golden mussel control facilities would not conflict with or obstruct implementation of an applicable water quality control plan or sustainable groundwater management plan.
66 California Department of Water Resources. 2020. Sustainable Groundwater Management Act 2019 Basin Prioritization Process and Results. May.

Page 299 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -156 Implementation of the proposed golden mussel control facilities would not degrade surface water or groundwater quality and would be less than significant.

4.10.4 Mitigation Measures
No mitigation measures are warranted.

Page 300 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-157

4.11 LAND USE AND PLANNING
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Physically divide an established community?
b. Cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?

4.11.1 Baseline Conditions

4.11.1.1 Existing Land Use
The North Bay Regional Water Treatment Plant (NBRWTP) is on the eastern periphery of Fairfield in Solano County, approximately 0.5 mile east of Peabody Road and north of Hilkert Road. The approximately 82-acre site is fully developed with public utility infrastructure, including treatment basins, chemical storage and feed systems, administrative buildings, and support facilities. The parcel is fenced, secured, and designed for industrial-scale operations consistent with its use as a regional water treatment facility by the City of Fairfield (City).

Surrounding land uses are a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential uses. To the east lies the One Lake master-planned residential community, consisting of recently developed low-density and medium-density housing with interspersed parks and internal roadways. To the west across Peabody Road are additional residential neighborhoods transitioning into agricultural and undeveloped lands. To the south, open space and vacant parcels transition into light industrial and commercial properties. To the north, land remains largely undeveloped and gradually transitions toward agricultural and open space areas extending toward Vacaville. Overall, the site exists within a semi-urbanized edge setting characterized by a functional and utilitarian land-use pattern, serving as a transition between urban neighborhoods and the agricultural-industrial corridor of eastern Fairfield.

4.11.1.2 Land Use Designations and Zoning
The Project site is designated Public Facilities (PF) in the City’s General Plan67. This designation provides for public infrastructure and utility uses that serve citywide and regional needs, including water treatment, conveyance, and related municipal services. The NBRWTP is in a zoning district also identified as PF, which is intended to accommodate uses and facilities that serve public interest.

The PF zoning district is consistent with the zoning use designation of the City’s General Plan. 68 Adjacent areas include the following General Plan land use designations: Recreation, Conservation, Train Station Specific Plan – Residential and Mixed-Use Planning Areas, and Residential (Low, Low Medium, and Medium). Surrounding areas are zoned as Recreation (REC), Residential – Medium 67 City of Fairfield. 2024. General Plan Land Use Diagram Map. 68 City of Fairfield. 2024. General Plan and Zoning Map.

Page 301 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -158 Density (RM), Residential – Low Medium Density (RLM: 4.5-PD and RLM: 5- PD), Open Space Conservation (OSC), Train Station Area: Planning Area 4 – Res (TS), and Train Station Area: Planning Area 2 – MU (TS). The existing land use and zoning pattern therefore reflects a compatible transition between urban residential, open space, recreational, and public-service uses, with the NBRWTP functioning as critical infrastructure supporting surrounding development.

4.11.1.3 Applicable Land Use Plans and Policies
Several local and regional plans apply to the Project area. The City’s General Plan identifies the NBRWTP as a major public utility installation serving regional water supply needs. Relevant General Plan policies emphasize the protection and efficient operation of existing public utilities, maintaining adequate service capacity, and minimizing potential land use conflicts between industrial and residential uses.

The Project also falls within the sphere of influence of the Fairfield-Suisun Sewer District (FSSD) and within the planning boundary of Solano County; however, land use authority resides with the City.

The Solano County General Plan (2008) designates surrounding unincorporated lands for Agriculture and Open Space, consistent with the existing edge condition of the site.

Regionally, the site lies within the Association of Bay Area Governments Plan Bay Area 2050 planning area, which identifies the broader Fairfield–Vacaville corridor as a Priority Development Area (PDA) focused on compact, sustainable growth near existing infrastructure. The NBRWTP’s ongoing operation and proposed expansion align with these policies by supporting water supply reliability and sustainable urban services.

4.11.1.4 Consistency with Surrounding Uses and Plans
The existing NBRWTP has operated at this location for several decades and represents a long-established use that is consistent with both the City’s and County of Solano’s plans for utility and public service infrastructure. The facility provides essential water treatment services that directly support residential and commercial development within Fairfield, Vacaville, and Suisun City.

The NBRWTP is fully compatible with its Public Facilities land use designation and surrounded primarily by a mix of vacant land, service-industrial parcels, water-distribution facilities and ancillary infrastructure, and residential use. The baseline condition thus reflects a stable, compatible, and policy-consistent public utility land use operating within an area transitioning from semi-rural to urbanized conditions.

4.11.2 Regulatory Requirements

4.11.2.1 Federal Regulations
There are no federal policies or regulations related to land use and planning that are applicable to the Project.

4.11.2.2 State Regulations
There are no State policies or regulations related to land use and planning that are applicable to the Project.

Page 302 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-159

4.11.2.3 Regional/Local
There are no regional or local policies or regulations related to land use and planning that are applicable to the Project.

4.11.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way. Therefore, both alignments are presumed to have similar impacts to land use and planning and are analyzed together in this section.
a. Would the project physically divide an established community? No Impact. The Project involves expansion of the NBRWTP and associated pipeline improvements entirely within the existing developed site and adjacent roadway rights-of-way. The NBRWTP parcel is already fenced, secured, and separated from surrounding residential neighborhoods, open space, and industrial uses. No new roads, barriers, or physical infrastructure would be constructed that could fragment or divide the surrounding One Lake residential community, adjacent neighborhoods, or agricultural lands. Construction and operational activities would be contained on-site or along existing roadway alignments and would not interfere with community connectivity, pedestrian access, or roadway circulation.
b. Would the project cause a significant environmental impact due to a conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect?
Less Than Significant Impact. The Project is designated PF under the City’s General Plan and is within a zoning district identified as PF, both of which allow public utility operations such as water treatment facilities. The Project would be consistent with General Plan objectives related to maintaining reliable public services, ensuring adequate infrastructure capacity, and supporting planned growth within established urban boundaries. Surrounding land uses, including residential neighborhoods, industrial development, agricultural lands, open space areas, and public infrastructure, are compatible with the continued operation and expansion of the NBRWTP. The pipeline alignments would be located primarily within existing utility corridors, roadway rights-of-way, and previously disturbed areas and would not alter existing land use designations or introduce incompatible land uses.

The Project would also be consistent with applicable regional and local planning documents, including the City’s General Plan, City of Vacaville General Plan, One Lake Specific Plan, Solano County General Plan, and Plan Bay Area 2050. Although the Project would increase treatment capacity up to 65 mgd, the additional capacity is intended to accommodate the combined existing and planned water demands of Fairfield and Vacaville within their respective adopted General Plan service areas. The Project would not extend water service beyond planned service boundaries,

Page 303 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -160 facilitate development outside areas designated for growth, or remove regulatory constraints that would otherwise limit development.

The increase in treatment capacity above the City’s projected buildout demand does not represent excess capacity available to support unplanned development. Rather, the NBRWTP is a regional facility by the City, and the increased capacity is intended to serve the combined water demands identified in the adopted General Plans and water planning documents of both the City of Vacaville and the City of Fairfield. The Project would not expand municipal service boundaries, establish new service areas, or provide infrastructure to support development beyond that already anticipated in adopted land use plans. Any future development would remain subject to applicable General Plan designations, zoning regulations, environmental review requirements, and infrastructure planning processes.

Therefore, although the Project would increase regional water treatment capacity, it would do so in support of planned growth previously contemplated in adopted land use and infrastructure planning documents and would not conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating an environmental effect. Impacts would be less than significant.

4.11.4 Mitigation Measures
No mitigation measures are warranted.

Page 304 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-161

4.12 MINERAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
b. Result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan?

4.12.1 Baseline Conditions
The Surface Mining and Reclamation Act (SMARA) enacted by the California Legislature in 1975 provides guidelines to assist with the classification and designation of mineral lands. Areas are classified on the basis of geologic factors without regard to existing land uses and ownership.

SMARA categorizes areas into four Mineral Resource Zones (MRZs):
• MRZ-1: An area where adequate information indicates that no significant mineral deposits are present, or where it is judged that little likelihood exists for their presence. • MRZ-2: An area where adequate information indicates that significant mineral deposits are present, or where it is judged that a high likelihood exists for their presence. • MRZ-3: An area containing mineral deposits of which their significance cannot be properly evaluated.
• MRZ-4: An area where information is not adequate enough to be able to assign to any other MRZ zone.

According to the CGS Mineral Resources Zone mapping 69 for Solano County, the site is classified as MRZ-1, indicating that adequate geologic information exists to conclude that there are no significant mineral resources present or likely to occur. No active or historical mineral extraction activities have been recorded on or adjacent to the site, and the surrounding lands are not used for mineral production. The soils and underlying geologic formations consist primarily of unconsolidated alluvial deposits typical of the lower Coast Range foothills and Sacramento-San Joaquin River Delta plain, which are not known to contain economically valuable mineral resources. 69 California Department of Conservation. 2025. DOC Maps: Mines and Mineral Resources. Website:
https://maps.conservation.ca.gov/mineralresources/ (accessed May 7, 2025).

Page 305 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -162

4.12.2 Regulatory Requirements

4.12.2.1 Federal Regulations
There are no federal policies or regulations related to mineral resources that are applicable to the Project.

4.12.2.2 State Regulations
Surface Mining and Reclamation Act of 1975. The State of California has recognized that mineral resources are essential to the needs of society and the economic well-being of the State. In 1975, the State Legislature passed the SMARA, Public Resources Code (PRC) Section 2710, et seq. The intent of SMARA is to promote production and conservation of mineral resources, minimize the environmental effects of mining, and ensure mined lands are reclaimed to conditions suitable for alternative uses. Reclaiming land for other uses once mining operations are completed is important for the general health, safety, and welfare of the community. Under SMARA, permits are required for all mining activities commencing operation on or after January 1, 1976. In addition, all new and existing mining operations are required to file a reclamation plan with the appropriate jurisdiction to address how the land would be brought back to a productive status once mining operations cease.

SMARA also requires every lead agency within which a mineral resource’s economic value has been classified by the State Geologist or has been designated as having regional economic significance by the California State Mining and Geology Board (SMGB), to establish Mineral Resource Management Policies (MRMPs) for the mineral resources in its General Plan.

Under current SMARA statutes (PRC Section 2763), prior to permitting a use that would threaten the potential to extract minerals in an area designated by the SMGB as having mineral resources of regional or statewide significance, the City must prepare a statement specifying its reasons for permitting the proposed use. In it, the City must consider its MRMPs, balance the mineral values against alternative land uses, and consider the importance of the minerals to their market region as a whole and not just their importance to the City area. This process is designed to ensure that decision-makers weigh the economic and environmental value of nonrenewable mineral resources when determining whether or not to protect existing mineral resources.

4.12.2.3 Local Regulations
City of Vacaville General Plan.
• Goal COS-16. Consider the location of mineral resources in the development review process. ○ Policy COS-P16.1. When reviewing land use proposals, take into account potentially available mineral resources on the property or in the vicinity of the project site.

4.12.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and

Page 306 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-163 adjacent to previously disturbed areas, existing roadways, and rights-of-way on land that is not used or designated for mineral resource extraction. Therefore, both alignments are presumed to have similar impacts to mineral resources and are analyzed together in this section. a. Would the project result in the loss of availability of a known mineral resource that would be of value to the region and the residents of the state?
No Impact. No active or inactive mineral extraction operations are within or adjacent to the NBRWTP or either pipeline alignment. The City’s General Plan does not identify any locally important mineral resource recovery sites, mineral resource overlays, or designated mineral extraction areas within the NBRWTP site or vicinity. Similarly, although a portion of the Project extends into Vacaville, neither the proposed pipeline alignments nor the connection area within Vacaville are within a designated mineral resource area, active mining operation, or known regionally significant mineral resource deposit. Historically, mineral extraction in Solano County has occurred primarily in the Montezuma Hills, Green Valley, and other localized areas where economically recoverable aggregate resources are present.

The NBRWTP site and pipeline alignments are within developed utility corridors, roadway rights-of-way, agricultural lands, and previously disturbed areas underlain predominantly by alluvial deposits that are not identified as significant mineral resources of statewide or regional importance.

Implementation of the Project would not preclude access to, extraction of, or future use of any known mineral resource.

The Project is also consistent with the City of Vacaville General Plan Goal COS-16 and Policy COS-P16.1, which require consideration of potentially available mineral resources during the development review process. Review of available planning documents and mineral resource mapping indicates that the NBRWTP site and pipeline alignments do not contain identified mineral resource deposits of regional or statewide significance, and the Project would not interfere with any existing or planned mineral extraction activities. Therefore, the Project would not result in the loss of availability of a known mineral resource that would be of value to the region or the residents of the State. No impact would occur.
b. Would the project result in the loss of availability of a locally-important mineral resource recovery site delineated on a local general plan, specific plan or other land use plan? No Impact. Neither the City‘s General Plans nor the Solano County General Plan identifies the Project or nearby vicinity as a locally important mineral resource area or mineral resource recovery site. Known mineral resource extraction areas within Solano County are generally concentrated in the Rio Vista area and along the Sacramento River corridor, where sand, gravel, and clay resources are extracted for construction. No impact would occur.

4.12.4 Mitigation Measures
No mitigation measures are warranted.

Page 307 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -164

4.13 NOISE
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project result in:
a. Generation of a substantial temporary or permanent
increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? b. Generation of excessive groundborne vibration or
groundborne noise levels?
c. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels?

4.13.1 Technical Background

4.13.1.1 Characteristics of Sound
Noise is usually defined as unwanted sound. Noise consists of any sound that may produce physiological or psychological damage and/or interfere with communication, work, rest, recreation, and sleep.

To the human ear, sound has two significant characteristics: pitch and loudness. Pitch is generally an annoyance, while loudness can affect the ability to hear. Pitch is the number of complete vibrations (or cycles per second) of a wave, resulting in the tone’s range from high to low. Loudness is the strength of a sound, describes a noisy or quiet environment, and is measured by the amplitude of the sound wave. Loudness is determined by the intensity of the sound waves combined with the reception characteristics of the human ear. Sound intensity is the average rate of sound energy transmitted through a unit area perpendicular to the direction in which the sound waves are traveling. This characteristic of sound can be precisely measured with instruments.

In the analysis of a project, the noise environment of the project area is defined in terms of sound intensity and its effect on adjacent sensitive land uses.

Measurement of Sound. Sound intensity is measured through the A-weighted scale to correct for the relative frequency response of the human ear. That is, an A-weighted noise level de-emphasizes low and very high frequencies of sound similar to the human ear’s de-emphasis of these frequencies. Decibels (dB), unlike the linear scale (e.g., inches or pounds), is a scale based on powers of 10.

For example, 10 dB is 10 times more intense than 0 dB, 20 dB is 100 times more intense than 0 dB, and 30 dB is 1,000 times more intense than 0 dB. Thirty decibels (30 dB) represents 1,000 times as much acoustic energy as 0 dB. The decibel scale increases as the square of the change, representing the sound pressure energy. A sound as soft as human breathing is about 10 times greater than 0 dB.

Page 308 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-165 The decibel system of measuring sound gives a rough connection between the physical intensity of sound and its perceived loudness to the human ear. A 10 dB increase in sound level is perceived by the human ear as only a doubling of the loudness of the sound. Ambient sounds generally range from 30 A-weighted decibels (dBA) (very quiet) to 100 dBA (very loud).

Sound levels generate from a source, and their decibel level decreases as the distance from that source increases. Sound dissipates exponentially with distance from the noise source. For a single point source, sound levels decrease approximately 6 dB for each doubling of distance from the source. This drop-off rate is appropriate for noise generated by stationary equipment. If noise is produced by a line source, such as highway traffic or railroad operations, the sound decreases 3 dB for each doubling of distance in a hard site environment. Line source noise in a relatively flat environment with absorptive vegetation decreases 4.5 dB for each doubling of distance.

There are many ways to rate noise for various time periods, but an appropriate rating of ambient noise affecting humans also accounts for the annoying effects of sound. The equivalent continuous sound level (Leq) is the total sound energy of time-weighted average noise over a sample period.

However, the predominant rating scales for human communities in California are Leq and the Community Noise Equivalent Level (CNEL) or the day-night average noise level (Ldn) based on dBA.

CNEL is the time-varying noise over a 24-hour period, with a 5 dBA weighting factor applied to the hourly Leq for noises occurring from 7:00 p.m. to 10:00 p.m. (defined as relaxation hours) and a 10 dBA weighting factor applied to noises occurring from 10:00 p.m. to 7:00 a.m. (defined as sleeping hours). Ldn is similar to the CNEL scale but without the adjustment for events occurring during the relaxation hours. CNEL and Ldn are within 1 dBA of each other and are normally interchangeable. The noise adjustments are added to the noise events occurring during the more sensitive hours.

Other noise rating scales of importance, when assessing the annoyance factor, include the maximum instantaneous noise level (Lmax), which is the highest exponential time-averaged sound level that occurs during a stated time period. The noise environments discussed in this analysis are specified in terms of Lmax for short-term noise impacts. Lmax reflects peak operating conditions and addresses the annoying aspects of intermittent noise. Another noise scale often used together with Lmax in noise ordinances for enforcement purposes is noise standards in terms of percentile noise levels. For example, the L10 noise level represents the noise level exceeded 10 percent of the time during a stated period. The L50 noise level represents the median noise level; half the time the noise level exceeds this level and half the time it is less. The L90 noise level represents the noise level exceeded 90 percent of the time and is considered the background noise level during a monitoring period. For a relatively constant noise source, Leq and L50 are approximately the same.

Noise impacts can be described in three categories. The first is audible impacts, which refer to increases in noise levels noticeable to humans. Changes of approximately 3 dBA are generally considered barely perceptible under typical outdoor conditions. The second category, potentially audible, refers to a change in the noise level between 1 dB and 3 dB. This range of noise levels has been found to be noticeable only in laboratory environments. The last category is changes in noise levels of less than 1 dB, which are inaudible to the human ear. Only audible changes in existing ambient or background noise levels are considered potentially significant.

Page 309 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -166 Physiological Effects of Noise. Prolonged exposure to noise levels above approximately 85 dBA may result in permanent hearing damage, depending on exposure duration. In comparison, extended periods of noise exposure above 90 dBA would result in permanent cell damage. When the noise level reaches 120 dBA, a tickling sensation occurs in the human ear, even with short-term exposure.

This level of noise is called the threshold of feeling. As the sound reaches 140 dBA, the tickling sensation is replaced by the feeling of pain in the ear. This is called the threshold of pain. Sound levels from 160 to 165 dBA will potentially result in dizziness or loss of equilibrium. The ambient or background noise problem is widespread and generally more concentrated in urban areas than in outlying, less developed areas.

Table 4.13.A lists definitions of acoustical terms, and Table 4.13.B shows common sound levels and their noise sources.

Table 4.13.A: Definitions of Acoustical Terms
Term Definition
Decibel, dB A unit of noise level that denotes the ratio between two quantities that are proportional to power; the number of decibels is 10 times the logarithm (to the base 10) of this ratio.

Frequency, Hz Of a function periodic in time, the number of times that the quantity repeats itself in 1 second (i.e., number of cycles per second).

A-Weighted Sound
Level, dBA
The sound level obtained by use of A-weighting. The A-weighting filter de-emphasizes the very-low-frequency and very-high-frequency components of the sound in a manner similar to the frequency response of the human ear and correlates well with subjective reactions to noise. (All sound levels in this report are A-weighted unless reported otherwise.) L2, L8, L50, L90 The fast A-weighted noise levels that are equaled or exceeded by a fluctuating sound level 2 percent, 8 percent, 50 percent, and 90 percent of a stated time period.

Equivalent
Continuous Sound
Level, Leq
The level of a steady sound that, in a stated time period and at a stated location, has the same A-weighted sound energy as the time-varying sound.

Community Noise
Equivalent Level,
CNEL
The 24-hour A-weighted average sound level from midnight to midnight, obtained after the addition of 5 dB to sound levels occurring in the evening from 7:00 p.m. to 10:00 p.m. and after the addition of 10 dB to sound levels occurring in the night between 10:00 p.m. and 7:00 a.m.

Day/Night Average
Noise Level, Ldn
The 24-hour A-weighted average sound level from midnight to midnight, obtained after the addition of 10 dB to sound levels occurring in the night between 10:00 p.m. and 7:00 a.m.

Lmax, Lmin The maximum and minimum A-weighted sound levels measured on a sound level meter during a designated time interval using fast time averaging.

Ambient Noise Level The all-encompassing noise associated with a given environment at a specified time; usually a composite of sound from many sources from many directions, near and far; no particular sound is dominant.

Intrusive The noise that intrudes over and above the existing ambient noise at a given location. The relative intrusiveness of a sound depends on its amplitude, duration, frequency, time of occurrence, and tonal or informational content, as well as the prevailing ambient noise level.

Source: Handbook of Acoustical Measurements and Noise Control (Harris 1991).

Page 310 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-167 Table 4.13.B: Common Sound Levels and Their Noise Sources Noise Source A-Weighted Sound
Level in Decibels Noise Environments Subjective Evaluations Near Jet Engine 140 Deafening 128 times as loud
Civil Defense Siren 130 Threshold of Pain 64 times as loud Hard Rock Band 120 Threshold of Feeling 32 times as loud Accelerating Motorcycle a Few Feet Away 110 Very Loud 16 times as loud Pile Driver; Noisy Urban Street/Heavy City Traffic 100 Very Loud 8 times as loud Ambulance Siren; Food Blender 95 Very Loud —
Garbage Disposal 90 Very Loud 4 times as loud
Freight Cars; Living Room Music 85 Loud —
Pneumatic Drill; Vacuum Cleaner 80 Loud 2 times as loud Busy Restaurant 75 Moderately Loud —
Near-Freeway Auto Traffic 70 Moderately Loud Reference Level Average Office 60 Quiet ½ as loud
Suburban Street 55 Quiet —
Light Traffic; Soft Radio Music in Apartment 50 Quiet ¼ as loud Large Transformer 45 Quiet —
Average Residence without Stereo Playing 40 Faint ⅛ as loud Soft Whisper 30 Faint —
Rustling Leaves 20 Very Faint —
Human Breathing 10 Very Faint Threshold of Hearing
— 0 Very Faint —
Source: Compiled by LSA (2026).

4.13.1.2 Fundamentals of Vibration
Vibration refers to ground-borne noise and perceptible motion. Ground-borne vibration is almost exclusively a concern inside buildings and is rarely perceived as a problem outdoors. The motion may be discernible outdoors, but without the effects associated with the shaking of a building, there is less adverse reaction. Vibration energy propagates from a source through intervening soil and rock layers to the foundations of nearby buildings. The vibration then propagates from the foundation throughout the remainder of the structure. Building vibration may be perceived by occupants as the motion of building surfaces, the rattling of items on shelves or wall hangings, or a low-frequency rumbling noise. The rumbling noise is caused by the vibration of walls, floors, and ceilings radiating sound waves. Annoyance from vibration often occurs when the vibration exceeds the threshold of perception by 10 dB or less, which is an order of magnitude below the damage threshold for normal buildings.

Typical sources of ground-borne vibration are construction activities (e.g., blasting, pile driving, and operating heavy-duty earthmoving equipment), steel-wheeled trains, and occasional traffic on rough roads. Problems with both ground-borne vibration and noise from these sources are usually localized to areas within approximately 100 feet from the vibration source, although there are examples of ground-borne vibration causing interference out to distances greater than 200 feet (Federal Transit Administration’s [FTA] Transit Noise and Vibration Impact Assessment Manual [2018]). When roadways are smooth, vibration from traffic, even heavy trucks, is rarely perceptible.

It is assumed for most projects that the roadway surface will be smooth enough that ground-borne

Page 311 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -168 vibration from street traffic will not exceed the impact criteria; however, both construction of the project and freight train operations could result in ground-borne vibration that may be perceptible and annoying.

Ground-borne noise is not likely to be a problem because noise arriving via the normal airborne path will usually be greater than ground-borne noise. Ground-borne vibration has the potential to disturb people and damage buildings. Although it is very rare for train-induced ground-borne vibration to cause even cosmetic building damage, it is not uncommon for construction processes (e.g., blasting and pile driving) to cause vibration of sufficient amplitudes to damage nearby buildings. 70 Ground-borne vibration is usually measured in terms of vibration velocity, either the root-mean-square (RMS) velocity or peak particle velocity (PPV). The RMS velocity is best for characterizing human response to building vibration, and PPV is used to characterize potential for damage. Decibel notation acts to compress the range of numbers required to describe vibration. The vibration velocity level in decibels is defined as the following:

Lv = 20 log10 [V/Vref]
where Lv is the vibration velocity in decibels (VdB), V is the RMS velocity amplitude, and Vref is the reference velocity amplitude, or 1 x 10-6 inches/second (in/sec) used in the United States.

4.13.2 Baseline Conditions

4.13.2.1 Overview of the Noise Environment
The North Bay Regional Water Treatment Plant (NBRWTP) is in an area characterized by a mix of utility infrastructure, open space, and low‑density rural residential uses. Ambient noise levels in the vicinity of the plant and along the Linear Trail pipeline alignment are influenced primarily by:
• Vehicular traffic on nearby roadways, including Peabody Road, Vanden Road, and local access routes
• Existing NBRWTP operations, including pumps, blowers, and intermittent vehicle activity • Natural environmental sounds, such as wind and birds

4.13.2.2 Long‑Term Noise Measurements
To characterize existing ambient noise conditions in the area, noise measurements were gathered in the vicinity of the Project site. The locations of those noise measurements are shown on Figure

4.13-1, Existing Noise Monitoring Locations. Three long-term, 24‑hour measurements (LT-1 through LT-3) were taken from May 7 to May 8, 2026, at representative locations near the NBRWTP and along the proposed Linear Trail pipeline alignment. Table 4.13.C shows the results of the noise measurements. Existing noise levels range from 61.8 dBA CNEL to 69.0 dBA CNEL at the surrounding sensitive receptors.
70 Federal Transit Administration (FTA). 2018. Transit Noise and Vibration Impact Assessment Manual, FTA Report No. 0123. September.

Page 312 of 1497 ends

SOURCE: Google Earth 2026
FIGURE 4.13-1
Existing Noise Monitoring Locations
Fairfield-Vacaville Water Works Project FEET
0 750 1500
I:\2025\20252567.02\G\Noise_Locs.ai (7/1/2026)
Peabody Rd
Vanden Rd
LT-1
LT-2
LT-3
Peabody Rd
Foxboro Pkwy
Vanden Rd

Page 313 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -170 This page intentionally left blank

Page 314 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-171 Table 4.13.C: Existing Noise Level Measurements
Locatio
n Description
Range of
Daytime
Noise Levels
(dBA Leq)
Range of
Evening
Noise Levels
(dBA Leq)
Range of
Nighttime
Noise Levels
(dBA Leq)
Average
Daily Noise
Level
(dBA CNEL)
LT-1 East side of Waterworks Lane, across the street from 5289 Gramercy Circle, Fairfield, CA.

57.3-61.2 58.0-58.6 57.5-60.8 65.7
LT-2 Across Lake Trail from 2521 Elan Place, Vacaville, CA. 54.0-63.3 58.0-61.0 58.7-66.6 69.0 LT-3 431 Melissa Court, Vacaville, CA. 46.6-56.2 52.8-56.1 51.0-58.5 61.8 Source: Compiled by LSA (2026).

CNEL= Community Noise Equivalent Level
dBA = A-weighted decibels
ft = foot/feet
Leq = equivalent continuous sound level

4.13.3 Regulatory Requirements

4.13.3.1 Federal Regulations
United States Noise Control Act. In 1972, Congress enacted the United States Noise Control Act.

This act authorized the United States Environmental Protection Agency (EPA) to publish descriptive data on the effects of noise and establish levels of sound “requisite to protect the public welfare with an adequate margin of safety.” These levels are separated into health (hearing loss levels) and welfare (annoyance levels). For protection against hearing loss, 96 percent of the population would be protected if sound levels are less than or equal to 70 dBA during a 24-hour period of time. At 55 dBA Ldn, 95 percent sentence clarity (intelligibility) may be expected at 11 feet with no community reaction. However, 1 percent of the population may complain about noise at this level, and 17 percent may indicate annoyance. The EPA cautions that these identified levels are guidelines, not standards.

Federal Transit Administration. The Federal Transit Administration (FTA) Transit Noise and Vibration Impact Assessment Manual (2018) provides national guidance for evaluating noise and vibration impacts from transportation and construction projects. FTA does not establish enforceable noise limits for non‑transit projects, but its methodologies are commonly used to estimate construction noise levels for CEQA analyses. The FTA provides screening and detailed assessment criteria for evaluating construction noise impacts. For residential land uses, the detailed assessment criterion is 80 dBA Leq over an 8-hour daytime period.

Although the City of Fairfield (City) does not have daytime construction noise level limits for activities that take place within the specified hours to determine potential CEQA noise impacts, construction noise was assessed using criteria from the Transit Noise and Vibration Impact Assessment Manual (FTA Manual) 71. Table 4.13.D shows the Federal Transit Administration’s (FTA) Detailed Assessment Construction Noise Criteria based on the composite noise levels per construction phase.
71 Federal Transit Administration (FTA). 2018. Transit Noise and Vibration Impact Assessment Manual, FTA Report No. 0123. September.

Page 315 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -172 Table 4.13.D: Detailed Assessment Daytime Construction
Noise Criteria
Land Use Daytime 8-hour Leq (dBA)
Residential 80
Commercial 85
Industrial 90
Source: Transit Noise and Vibration Impact Assessment Manual (FTA 2018). dBA = A-weighted decibels
Leq = equivalent continuous sound level

4.13.3.2 State Regulations
California Health and Safety Code, Division 28, Noise Control Act. The California Noise Control Act states that excessive noise is a serious hazard to public health and welfare and that it is the policy of the State to provide an environment for all Californians that is free from noise that jeopardizes their health or welfare. The goal is to minimize the number of people that would be exposed to excessive noise but not create an environment completely free from any noise.

State of California General Plan Guidelines. The State of California regulates vehicular and freeway noise affecting classrooms, sets standards for sound transmission and occupational noise control, and identifies noise insulation standards and airport noise/land-use compatibility criteria. The State of California Governor’s Office of Planning and Research (OPR) 2017 General Plan Guidelines (OPR 2017), also provide guidance for the acceptability of projects within specific CNEL/Ldn contours. The General Plan Guidelines present adjustment factors that may be used in order to arrive at noise acceptability standards that reflect the noise control goals of the community, the particular community’s sensitivity to noise.

California Department of Transportation. Vibration standards included in the California Department of Transportation (Caltrans) Transportation and Construction Vibration Guidance Manual 72 (Caltrans Manual) are used in this analysis for ground-borne vibration impacts on human annoyance and building damage. The criteria for environmental impact from ground-borne vibration are based on the maximum levels for a single event and the RMS vibration level. Table 4.13.E provides the criteria for assessing the potential for interference or annoyance from vibration levels in a building. Table

4.13.F lists the potential vibration building damage criteria associated with construction activities, as suggested in the Caltrans Manual. As shown in Table 4.13.E, a vibration level of up to 0.5 inches per second (in/sec) in peak particle velocity (PPV) is considered safe for newer residential structures and modern industrial or commercial buildings and would not result in any construction vibration damage. For older residential structures, a vibration level of up to 0.5 inches per second (in/sec) in peak particle velocity (PPV) is considered safe and would not result in any construction vibration damage. As it relates to human annoyance, and as shown on Table 4.13.F, a level of 0.1 in/sec root-mean-square (RMS) is considered strongly perceptible while a level of 0.4 in/sec RMS is considered severe.
72 California Department of Transportation (Caltrans). 2020. Transportation and Construction Vibration Guidance Manual.

Page 316 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-173 Table 4.13.E: Interpretation of Vibration Criteria for Detailed Analysis Human Response Vibration Level (RMS in/sec)
Barely perceptible 0.01
Distinctly perceptible 0.04
Strongly perceptible 0.10
Severe 0.40
Source: Transportation and Construction Vibration Guidance Manual (Caltrans 2020). in/sec = inch/inches per second RMS = root-mean-square
Table 4.13.F: Construction Vibration Damage Criteria
Structure / Condition PPV (in/sec)
Extremely fragile historic buildings, ruins, ancient monuments 0.08 Fragile buildings 0.10
Historic and some old buildings 0.25
Older residential structures 0.30
New residential structures 0.50
Modern industrial / commercial buildings 0.50
Source: Table 19, Transportation and Construction Vibration Guidance Manual (Caltrans 2020). in/sec = inch(es) per second
PPV = peak particle velocity

4.13.3.3 Local Regulations
City of Fairfield Municipal Code. The City of Fairfield regulates noise through Fairfield Municipal Code Chapter 25, Article X. Noise Regulations. Relevant provisions include:
• Construction Hours: Section 25.1404 prohibits operating or permitting the operation of any tools or equipment used in construction, grading or demolition works between the hours of 10:00 p.m. and 7:00 a.m. except by written permission of the Director of Public Works. • Operational Noise Limits: The City establishes maximum allowable noise levels at property lines based on zoning in Section 25.1403. For residential zones, exterior noise levels generally may not exceed 50 dBA Leq during daytime and 45 dBA Leq during nighttime, or 70 dBA Lmax during daytime and 65 dBA Lmax during nighttime, unless exempted. Interior noise levels at residential uses may not exceed 40 dBA Leq during daytime and 35 dBA Leq during nighttime, or 60 dBA Lmax during daytime and 55 dBA Lmax during nighttime, unless exempted. In situations where the existing ambient noise level exceeds the noise levels indicated in the above table, any new noise source must include mitigation that reduces the noise level to the existing ambient level.

City of Vacaville Municipal Code. The City of Vacaville regulates noise through Vacaville Municipal Code Section 14.09.240.140 Noise and Section 8.10.060(O). Relevant provisions include:
• Construction Hours: Section 8.10.060(O) prohibits construction, repair work or grading within 500 feet from any occupied residence between the hours of seven o’clock p.m. and seven

Page 317 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -174 o’clock a.m. Monday through Saturday. No such construction, repair work or grading activities shall be allowed on Sundays or holidays. These restrictions do not apply to city projects. • Operational Noise Limits: The City establishes maximum allowable noise levels at receiving land uses in Section 14.09.240.140(C). For residential uses, the applicable limits are 50 dBA Leq during daytime and 45 dBA Leq during nighttime, measured at the courtyards, patios, private yard areas, and common activity areas.
○ Exemptions: Public works construction performed by or on behalf of the City may be exempt from certain operational limits, provided work occurs within allowable hours.

4.13.4 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment, which are further described in Section 2.0, Project Description. Both pipeline alignments would require consistent or similar construction and operational maintenance activities and are similar in size. Therefore, both alignments are presumed to have similar impacts to noise and are analyzed together in this section.
a. Would the project result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the project in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies? Less Than Significant with Mitigation Incorporated.

Construction-Period Impacts. Project construction would result in short-term noise and vibration. It is noted that construction activities are exempt from compliance with noise ordinance criteria based on Section 8.20.070 of the Fairfield City Code. Maximum construction noise would be short-term, generally intermittent depending on the construction phase, and variable depending on receiver distance from the active construction zone. The duration of various types of construction noise and vibration would vary from 1 day to several weeks, depending on the phase of construction. The following describes levels and types of impacts that may occur during construction.

Two types of short-term noise would occur during Project construction including (1) equipment delivery and construction worker commutes and (2) Project construction operations.

The first type of short-term construction noise would result from the transport of construction equipment and materials to the Project site and construction worker commutes. These transportation activities would incrementally raise noise levels on access roads leading to the site. Heavy construction equipment would generally remain on-site for the duration of each construction phase, and will not add to the daily traffic volume in the Project vicinity. Although there would be a relatively high single-event noise exposure potential causing intermittent noise nuisance (passing trucks at 50 ft would generate up to a maximum of 84 dBA Lmax), the effect on

Page 318 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-175 longer-term (daily) ambient noise levels would be small because the daily construction-related vehicle trips are small compared to the existing daily traffic volume on Peabody Road, which would be used to access the Project site.

The results of the California Emissions Estimator Model (CalEEMod)(version 2022.1) contained in Appendix A indicate that the grading phase would generate the most trips out of all of the construction phases and have an passenger car equivalent traffic volume of 3,682 passenger car equivalent vehicles on Peabody Road. Based on the City of Fairfield Open Data Hub, Peabody Road has an estimated existing average daily trips volume of 16,739 near the Project site. Based on the information above, construction‐related traffic would increase noise levels by up to 0.9 dBA. A noise level increase of less than 3 dBA would not be perceptible to the human ear in an outdoor environment. Therefore, short-term construction-related noise impacts associated with worker commute and equipment transport to the Project site would be less than significant.

The second type of short-term noise impact is related to noise generated during construction at the Project site. Construction is undertaken in discrete steps, each of which has its own mix of equipment, and consequently, its own noise characteristics. These various sequential phases would change the character of the noise generated on the Project site. Therefore, the noise levels vary as construction progresses. Despite the variety in the type and size of construction equipment, similarities in the dominant noise sources and patterns of operation allow construction-related noise ranges to be categorized by work phase. Table 4.13.G lists the maximum noise levels recommended for noise impact assessments for typical construction equipment based on a distance of 50 feet between the construction equipment and a noise receptor. Typical operating cycles for these types of construction equipment may involve 1–2 minutes of full power operation followed by 3–4 minutes at lower power settings.

Table 4.13.G: Typical Construction Equipment Noise Levels Equipment Description Acoustical Usage Factor (%) Maximum Noise Level (Lmax) at 50 feet
Compressor 100 81
Concrete Mixer 40 85
Concrete Pump 40 85
Crane 16 83
Dozer 40 80
Forklift 20 75
Front [End] Loader 40 79
Generator 100 78
Grader 8 85
Impact Pile Drivers 20 95
Scraper 40 88
Welder 40 74
Source: Noise from Construction Equipment and Operations, Building Equipment, and Home Appliances (EPA 1971); Roadway Construction Noise Model (FHWA 2006).

FHWA = Federal Highway Administration
Lmax = maximum instantaneous sound level
EPA = United States Environmental Protection Agency

Page 319 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -176 In addition to the reference maximum noise level, the usage factor provided in Table 4.13.G is used to calculate the hourly noise level impact for each piece of equipment based on the following equation:


 

 += − 50
log20.).log(10..)( D
eq FULEequipL
where: Leq (equip) = Leq at a receiver resulting from the operation of a single piece of equipment over a specified time period
E.L. = Noise emission level of the particular piece of equipment at a reference distance of 50 ft
U.F. = Usage factor that accounts for the fraction of time that the equipment is in use over the specified period of time
D = Distance from the receiver to the piece of equipment Each piece of construction equipment operates as an individual point source. Using the following equation, a composite noise level can be calculated when multiple sources of noise operate simultaneously:

Using the equations from the methodology above, the CalEEMod results contained in Appendix A, and the reference information in Table 4.13.G, the composite noise levels for each phase have been calculated and are shown in Table 4.13.H. As shown in Table 4.13.H, the highest noise levels from on-site construction would occur during the paving phase, and are expected to be approximately 89 dBA Leq at a distance of 50 feet from the construction area. The linear phases would occur along the Linear and Peabody pipeline alignments. The highest noise levels near the pipeline alignments would occur during the linear grading and excavation phase, and is expected to be approximately 89 dBA Leq at a distance of 50 feet from the construction area.

Table 4.13.H: Noise Levels by Construction Phase
Phase Composite Reference Level at 50 feet
dBA Lmax dBA Leq
Demolition 92 86
Site Preparation 89 85
Grading 89 87
Building Construction 90 86
Paving 92 89
Architectural Coating 80 76
Linear, Grubbing & Land Clearing 88 84
Linear, Grading & Excavation 90 85
Linear, Drainage, Utilities, & Sub-Grade 89 86
Linear, Paving 89 85
Source: Compiled by LSA (2026).
1 Linear phases would occur along the selected pipeline alignment. All other phases would occur at the existing NBRWTP. dBA = A-weighted decibels
Leq = equivalent continuous noise level
Lmax = maximum instantaneous noise level

Page 320 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-177 Table 4.13.I shows the distance attenuation to the closest sensitive uses. As shown in Table 4.13.I, construction noise levels at the closest single-family residences would reach up to 68 dBA Leq, from the center of the Project site. The nearest sensitive receptor to construction activities at the existing NBRWTP would be the single-family residences approximately 540 feet west of the center of construction activities. The nearest sensitive receptor to construction activities along the pipeline alternatives would be the single-family residences approximately 50 feet west of the centerline of the proposed Peabody Road pipeline alignment. Table 4.13.I shows the construction noise levels at the closest single-family residences would reach up to 89 dBA Leq from the center of the pipeline alignment. This has a potentially significant impact. All other sensitive receptors are farther from areas of construction and would therefore experience lower noise levels.

Table 4.13.I: Construction Noise Levels
Land Use Direction
Reference
Noise Level at
50 ft
(dBA Leq)
Distance from
Center of the
Project Site to
the Property (ft)
Distance
Attenuation
(dBA)
Noise Level
(dBA Leq)
Construction
Noise
Standard1
(dBA Leq)
Residence West 89 540 21 68
80 Residence Southeast 89 850 25 64
Residence
West (Peabody
Road Pipeline
Alignment)
86 50 0 89
Residence
Northeast (Linear
Trail Pipeline
Alignment)
86 65 2 87
Source: Compiled by LSA (2026).
1 Daytime 8-hour construction noise criteria from Transit Noise and Vibration Impact Assessment Manual (FTA 2018). dBA = A-weighted decibels
ft = foot/feet
Leq = equivalent continuous sound level
Lmax = maximum instantaneous noise level
Although construction-related, short-term noise levels have the potential to be higher than existing ambient noise levels in the vicinity of both pipeline alternatives, noise impacts would no longer occur once Project construction is completed. Construction-related noise impacts at the nearest sensitive receptors could exceed the 80 dBA Leq 1-hour construction noise level criteria as established by the FTA; however, this exceedance is expected to be of short duration. Noise levels at the closest residential uses to the construction activities at the existing NBRWTP would be below FTA’s 80 dBA Leq 1-hour construction noise level criteria.

Compliance with the City of Fairfield’s Noise Ordinance would ensure that construction noise would not disturb the sensitive receptors during hours when ambient noise levels are likely to be lower (i.e., at night). Implementation of Mitigation Measure NOI-1 would limit construction hours and require the implementation of noise-reducing measures during construction.

Therefore, with implementation of Mitigation Measure NOI-1, construction noise impacts would be less than significant.

Operation-Period Impacts. Operation of the Project would introduce new mechanical equipment and process units associated with increased treatment capacity, including additional

Page 321 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -178 pumps, blowers, ozone generation equipment, wash water recovery systems, clarifiers, and chemical storage and feed systems. Operational noise sources would be located within new or existing buildings, within partially enclosed structures, or within below‑grade vaults, consistent with standard water treatment facility design.

Operation of the Project would not introduce any new outdoor mechanical equipment or other noise sources, and the change in noise would not be perceptible at off‑site receptors.

Pipeline maintenance activities would be intermittent and short‑duration and are not regulated as stationary noise sources under the Fairfield Municipal Code. Emergency utility work is exempt from construction‑hour restrictions, and routine maintenance would occur during allowable daytime hours. Any non‑emergency work outside allowable hours would require written authorization from the Director of Public Works.

As described above, with the incorporation of Mitigation Measure NOI-1, the Project would not result in generation of a substantial temporary or permanent increase in ambient noise levels in the vicinity of the proposed Project in excess of standards established in the local general plan or noise ordinance, or any other applicable standards. Therefore, this impact would be less than significant with mitigation incorporated.
b. Would the project result in generation of excessive groundborne vibration or groundborne noise levels?
Less Than Significant Impact. Table 4.13.J shows the reference vibration levels at a distance of 25 feet for each type of standard construction equipment from the Transportation and Construction Vibration Guidance Manual. 73 Although there is currently limited information regarding vibration source levels specific to the equipment that would be used for the Project, to provide a comparison of vibration levels expected for a Project of this size, a large bulldozer would generate 0.089 in/sec PPV-max (0.062 in/sec PPV-RMS) of ground-borne vibration when measured at 25 feet, based on the FTA Manual. Vibratory rollers would generate 0.210 in/sec PPV-max (0.147 in/sec PPV-RMS) of ground-borne vibration when measured at 25 feet.

The distance to the nearest buildings for vibration impact analysis is measured between the nearest off-site buildings and the Project construction boundary (assuming the construction equipment would only be used at or near the Project setback line or edge of the pipeline alignment). The formula for vibration transmission is:

LvdB (D) = LvdB (25 feet) – 30 Log (D/25)
PPVequip = PPVref x (25/D)1.1
The closest buildings are approximately 65 feet from the center of the proposed construction activities at the Linear Trail pipeline alignment and would experience vibration levels approaching

0.051 in/sec PPV. This vibration level would not have the potential to result in community 73 Caltrans. 2020. Transportation and Construction Vibration Guidance Manual.

Page 322 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-179 Table 4.13.J: Vibration Source Amplitudes for Construction Equipment Equipment Reference PPV/LV at 25 ft
Maximum PPV (in/sec) RMS PPV (in/sec)1
Pile Driver (Impact), Typical 0.644 0.451
Pile Driver (Sonic), Typical 0.170 0.119
Vibratory Roller 0.210 0.147
Hoe Ram 0.089 0.062
Large Bulldozer 0.089 0.062
Caisson Drilling 0.089 0.062
Loaded Trucks 0.076 0.053
Jackhammer 0.035 0.025
Small Bulldozer 0.003 0.002
Source: Transportation and Construction Vibration Guidance Manual (Caltrans 2020). 1 RMS VdB re 1 µin/sec. µin/sec = micro-inches per second
Caltrans = California Department of Transportation
ft = foot/feet
in/sec = inches per second
LV = velocity in decibels
PPV = peak particle velocity
RMS = root-mean-square
VdB = vibration velocity in decibels
annoyance because vibration levels would not exceed the Caltrans strongly perceptible annoyance threshold of 0.1 in/sec PPV-RMS. Other building structures that surround the Project site would experience lower vibration levels because they are farther away.

The closest buildings are approximately 30 feet from the boundary of the proposed construction activities at the Linear Trail pipeline alignment and would experience vibration levels approaching

0.172 in/sec PPV. This vibration level would not result in building damage because the building is conservatively assumed to be an older residential structure or better, and the anticipated Project-related vibration levels would not exceed the Caltrans vibration damage threshold of 0.30 PPV (in/sec). Other building structures that surround the Project site would experience lower vibration levels because they are farther away and are also conservatively assumed to be an older residential structure or better, and the anticipated Project-related vibration levels would not exceed the Caltrans vibration damage threshold of 0.30 PPV (in/sec). Therefore, vibration levels generated from Project construction would be less than significant.
c. For a project located within the vicinity of a private airstrip or an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? Less Than Significant Impact. Travis Air Force Base, a government-owned military base and airport, is approximately 3 miles southeast of the Project site. According to the Travis Air Force Base Land Use Compatibility Plan (LUCP) 74, the entire Project site is within Zone D of the Airport Influence Area. Zone D prohibits development that would result in hazards to flight, such as physical (e.g., tall 74 County of Solano. 2024a. Travis Air Force Base Land Use Compatibility Plan. August 8. Website:
https://www.solanocounty.gov/government/resource-management/commissions-special-districts/ solano-county-airport-land-use-commission (accessed June 2, 2026).

Page 323 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -180 objects), visual, and electronic forms of interference with the safety of aircraft operations. No other restrictions on development apply within Zone D.

As outlined in the Project description, the Project proposes to construct improvements to the existing NBRWTP as well as a new pipeline. These types of facilities are allowed within Zone D.

Further, although the Project site would be subject to noise associated with frequent aircraft overflight, the Project site is outside the 60 dBA CNEL noise contour as identified in the LUCP75 and exposure of such noise for the surrounding public and construction workers would be temporary and intermittent, as the Project would be of short duration. Therefore, the Project would not expose people residing or working in the Project area to excessive noise levels, and impacts would be less than significant.

4.13.5 Mitigation Measures
Mitigation Measure NOI-1: During construction, the Contractor shall be required to implement the following construction noise control measures when activities are within 100 feet of sensitive receptors:
• Construction activities occurring as part of the Project shall be subject to the limitations and requirements of the City of Fairfield Municipal Code, which states that construction activities are allowed between the hours of 7:00 a.m. to 10:00 p.m.
• Construction activities between 10:00 p.m. and 7:00 a.m. may occur only with written permission from the City of Fairfield Director of Public Works pursuant to Fairfield Municipal Code Section 25.1404.
• Equip all internal combustion engine-driven equipment with intake and exhaust mufflers that are in good condition and appropriate for the equipment.
• Locate stationary noise-generating equipment as far as possible from sensitive receptors when sensitive receptors adjoin or are near a construction area.
• Use “quiet” air compressors and other stationary noise sources where technology exists.
75 County of Solano. 2024b. Figure 2 - 2015 Maximum Mission CNEL Contours, Travis Air Force Base Land Use Compatibility Plan. August 8. Website: https://www.solanocounty.gov/government/resource-management/commissions-special-districts/solano-county-airport-land-use-commission (accessed June 2, 2026).

Page 324 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-181

4.14 POPULATION AND HOUSING
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
b. Displace substantial numbers of existing people or housing, necessitating the construction of replacement housing
elsewhere?

4.14.1 Baseline Conditions

4.14.1.1 Regional Context and Overall Service Area
The North Bay Regional Water Treatment Plant (NBRWTP) is operated by the City of Fairfield (City) and the City of Vacaville. The NBRWTP serves as a critical regional water supply facility providing potable water to both jurisdictions through a shared treatment and distribution system that draws raw water from the North Bay Aqueduct, part of the State Water Project. Because the facility provides essential water service to two separate municipalities, baseline conditions for population and housing appropriately consider the demographic and land use contexts of both Fairfield and Vacaville. Although the NBRWTP itself is located within Fairfield city limits, its operational service area extends northward into Vacaville, and its long-term capacity planning supports population and housing needs in both communities.

4.14.1.2 City of Fairfield Baseline Conditions
Fairfield, located in central Solano County, serves as a regional employment, commercial, and residential hub. According to the California Department of Finance 76, Fairfield has an estimated population of approximately 121,000 residents and includes a mix of residential neighborhoods, industrial corridors, and agricultural transition lands. The NBRWTP property itself contains no residential uses or housing units, and no individuals reside on-site. The existing operations are consistent with its PF land use designation and PF zoning, and the site functions solely as an essential utility installation.

Under baseline conditions, the NBRWTP does not contribute to population growth or housing demand within Fairfield. The facility’s operations are limited to existing staff and routine maintenance activities. Fairfield continues to plan for moderate residential growth through its adopted Housing Element (2023–2031), with infrastructure such as the NBRWTP supporting the City’s capacity to accommodate planned development in an orderly and sustainable manner. 76 California Department of Finance. 2025. Economic and Revenue Updates. Website:
https://dof.ca.gov/forecasting/economics/economic-and-revenue-updates/ (accessed June 25, 2026).

Page 325 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -182

4.14.1.3 City of Vacaville
Vacaville, located immediately northeast of Fairfield, is the other beneficiary of the NBRWTP water treatment services. Vacaville has a population of approximately 104,000 residents 77 and includes a diverse land use pattern with residential neighborhoods, a historic downtown core, and expanding employment centers along the Interstate 80 corridor. Like Fairfield, Vacaville relies on a combination of surface water supplies from the State Water Project and local groundwater sources to meet municipal and industrial demand, with the NBRWTP providing a key treated water supply component.

The NBRWTP’s operations are not within Vacaville’s city limits, and there is no housing provided at the Project site. However, the NBRWTP plays an essential role in supporting Vacaville’s existing and planned population by ensuring reliable potable water service and maintaining system redundancy and regional resilience. Baseline conditions for Vacaville therefore reflect a growing urban community with stable housing supply and moderate population growth, reliant in part on continued operation and capacity of the NBRWTP for future service demands.

4.14.1.4 Cumulative Growth
Overall, the NBRWTP functions as a regional water treatment facility that supports, but does not directly induce, population or housing growth within either jurisdiction. The Project contains no housing or residents and operations are consistent with existing land use designations for public utilities.

The NBRWTP currently provides treated water to Fairfield and Vacaville and operates near its design capacity of approximately 52.7 million gallons per day (mgd). The City of Fairfield’s 2024 Public Utility Master Plan and General Plan identify a projected 2 mgd treatment capacity shortfall between existing capacity and maximum day demand at buildout, indicating the need for future expansion to accommodate planned growth within existing land use assumptions. This identified shortfall represents a planning deficiency, not a limit on authorized development. Any capacity expansion to address this gap, as well as to meet Vacaville’s planned service demands, would therefore be consistent with existing General Plan buildout projections for both cities. The baseline condition reflects a fully utilized regional treatment facility operating within the parameters of existing General Plan growth forecasts, where additional treatment capacity is anticipated to maintain reliable service—not to induce unplanned growth beyond adopted land use designations.

The Project improvements are designed to enhance water treatment reliability, accommodate projected population and service demand, and modernize aging infrastructure to ensure continued regulatory compliance. Although the Project would increase available treatment capacity, it would not directly or indirectly induce substantial population growth or facilitate development beyond that already anticipated in adopted local land use plans. Under the California Environmental Quality Act, a project is considered growth inducing if it removes obstacles to growth or encourages development that would not otherwise occur. In this case, the Project would primarily maintain and 77 California Department of Finance. 2025. Economic and Revenue Updates. Website:
https://dof.ca.gov/forecasting/economics/economic-and-revenue-updates/ (accessed June 25, 2026).

Page 326 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-183 improve regional water system reliability and operational resiliency for planned growth projections already evaluated through local planning processes, rather than induce new or unplanned growth.

4.14.2 Regulatory Requirements

4.14.2.1 Federal Regulations
There are no federal policies or regulations related to population and housing that are applicable to the Project.

4.14.2.2 State Regulations
There are no state policies or regulations related to population and housing that are applicable to the Project.

4.14.2.3 Regional/Local Regulations
City of Vacaville General Plan Housing Element. 78
• Goal HE.4: Address Constraints. Identify and address governmental and nongovernmental constraints to the production, improvement and preservation of housing in Vacaville. ○ Policy HE.4 – GP 3: Ensure that public services, particularly for wastewater treatment and water supply, are adequate to accommodate potential housing increases.

4.14.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. Both pipeline alignments would be similar in size and would not involve the development of any population-inducing land uses. Therefore, both alignments are presumed to have similar impacts to population and housing and are analyzed together in this section. a. Would the project induce substantial unplanned population growth in an area, either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)?
Less Than Significant Impact. The Project would expand treatment capacity to meet projected potable water demands identified in the City of Fairfield’s 2024 Public Utilities Master Plan and both adopted General Plans. These planning documents account for anticipated residential, commercial, industrial, and institutional development within each city’s designated growth boundaries and service areas. Accordingly, the Project is intended to maintain reliable water service, operational flexibility, and system resiliency necessary to accommodate growth that has already been planned and evaluated through local and regional planning processes. 78 City of Vacaville. 2023. Vacaville General Plan Housing Element. Adopted June 27.

Page 327 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -184 The Project would not construct new housing, commercial development, or employment-generating land uses, nor would it extend municipal water service to areas outside existing or planned service boundaries. Although the Project would increase treatment capacity up to 65 mgd, which exceeds the City’s projected demand at General Plan buildout, the NBRWTP is a regional facility. The additional capacity is intended to serve the combined existing and planned water demands of both cities and does not represent capacity reserved for future development outside areas designated for growth in the respective General Plans.

Furthermore, the Project would not establish new service areas, extend urban infrastructure, or remove regulatory constraints that would otherwise limit growth. Any future development served by the NBRWTP would remain subject to applicable General Plan designations, zoning regulations, infrastructure planning requirements, and project-specific environmental review. Because the Project would support planned growth rather than induce new or unplanned growth, it would not directly or indirectly result in substantial population growth beyond that already anticipated in adopted planning documents. Therefore, impacts would be less than significant. b. Would the project displace substantial numbers of existing people or housing, necessitating the construction of replacement housing elsewhere?
No Impact. No residential uses, housing units, or occupants are within the NBRWTP site, and implementation of the treatment plant improvements would be entirely within the existing developed utility property.

The Project also includes two alternative pipeline alignments connecting the NBRWTP to the City of Vacaville’s existing water distribution system. The Linear Trail Pipeline Alignment would be primarily within existing utility corridors, access routes, and open space areas adjacent to the Putah South Canal and former railroad corridor. The Peabody Road Pipeline Alignment would be primarily within or adjacent to the existing Peabody Road right-of-way and other previously disturbed transportation and utility corridors. Although portions of the Peabody Road alignment would be near residential neighborhoods, the pipeline would be installed underground and would not require the demolition, removal, or permanent displacement of existing residences or housing units.

Construction activities associated with either pipeline alignment would be temporary in nature and may require short-term traffic control, access modifications, or temporary construction easements; however, no residential structures would be impacted. Following installation, disturbed areas would be restored, and the completed pipeline would operate underground with little to no change to existing land uses. The Project would not require acquisition of residential properties for removal, would not displace residents or businesses, and would not reduce the housing supply within Fairfield, Vacaville, or surrounding areas.

Because the Project would not result in the demolition or conversion of housing, the displacement of existing residents, or the loss of residential units, it would not necessitate the construction of replacement housing elsewhere. Therefore, no impact would occur.

Page 328 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-185

4.14.4 Mitigation Measures
No mitigation measures are warranted.

Page 329 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -186

4.15 PUBLIC SERVICES
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable
service ratios, response times or other performance
objectives for any of the public services:
i. Fire protection?
ii. Police protection?
iii. Schools?
iv. Parks?
v. Other public facilities?

4.15.1 Baseline Conditions
The North Bay Regional Water Treatment Plant (NBRWTP) is a fully developed public service site.

The NBRWTP does not include residential, commercial, or recreational uses, and no permanent population resides on the property. Nonetheless, the NBRWTP’s operation relies on local public service providers and surrounding communities in Fairfield and Vacaville, and its expansion may slightly increase service demand for fire, police, or other emergency services during construction and operations.

The NBRWTP is a fully developed public utility facility that provides potable water treatment services to Fairfield and Vacaville. The NBRWTP does not include residential, commercial, or recreational uses, and no permanent population resides on the property. The Project also includes two alternative pipeline alignments connecting the NBRWTP to Vacaville’s existing water distribution system. The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment.

Although the NBRWTP and pipeline alignments do not directly generate permanent population growth, their construction and operation rely on public service providers and surrounding communities in Fairfield and Vacaville. Construction activities could result in temporary demands on fire, police, emergency medical response, traffic management, and other public services, while operation of the expanded facility and transmission pipeline would continue to rely on existing emergency response and public safety services serving the area.

4.15.1.1 Fire Protection
Fire protection for the Project is provided by the Fairfield Fire Department (FFD), which maintains multiple fire stations distributed across the city, with the closest station approximately 2–3 miles

Page 330 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-187 from the NBRWTP. FFD operates five staffed fire stations located throughout Fairfield with combined staffing of 18 personnel on duty and employs approximately 77 staff that may vary year by year. 79 The department provides structural and wildland firefighting capabilities, hazardous material response, and emergency medical services. The NBRWTP itself includes fire suppression systems, emergency access routes, and compliance with California Fire Code standards, ensuring site-specific fire hazards are mitigated.

4.15.1.2 Police Protection
Police services for the NBRWTP and surrounding areas are provided by the Fairfield Police Department, with patrol and emergency response capabilities covering the eastern periphery of the city, including the NBRWTP and surrounding neighborhoods. The main Police Station is at 1000 Webster Street, Fairfield. According to City data, the department employes approximately 121 sworn officers, although numbers may vary year by year. Police service levels are adequate to respond to routine calls, security incidents at the facility, and community emergencies. The NBRWTP maintains controlled access and security measures to minimize risks, and there are no current deficiencies in police protection services affecting the site.

4.15.1.3 Schools
Nearby educational institutions in Fairfield and Vacaville, including elementary, middle, and high schools, are served by the Fairfield-Suisun Unified School District and the Vacaville Unified School District, respectively. Vanden High School is the closest school to the NBRWTP and is approximately

1.05 miles to the south.

4.15.1.4 Parks and Other Public Facilities
The City of Fairfield (City) maintains diverse and well established parks, trails, and recreation system that serves its residents and surrounding communities. Facilities operated by the Fairfield Parks and Recreation Department include neighborhood parks, community parks, a large regional open‐space park such as the Rockville Hills Regional Park. Nearby parks and recreational facilities exist within the surrounding residential neighborhoods, and access is maintained independent of NBRWTP operations. Employees at the NBRWTP may use these parks and facilities during lunch breaks or after-work hours. The closest park is to the NBRWTP is Gary Falati Park in an adjacent residential neighborhood.

4.15.2 Regulatory Requirements

4.15.2.1 Federal Regulations
There are no federal policies or regulations related to public services that are applicable to the Project.
79 City of Fairfield. n.d. Operations. Website: https://www.fairfield.ca.gov/government/city-departments/ fire/operations (accessed May 7, 2026).

Page 331 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -188

4.15.2.2 State Regulations
California Health and Safety Code. Sections 13000 et seq. of the California Health and Safety Code included fire regulations for building standards (also in the California Building Code), fire-protection and notification system, fire-protection devices such as extinguishers and smoke alarms, high-rise building and childcare facility standards, and fire-suppression training.

California Fire Code. The California Fire Code (Title 24 California Code of Regulations, Part 9) is based on the 2012 International Fire Code and includes amendments from the State of California fully integrated into the code. The California Fire Code has fire safety-related building standards that are referenced in other parts of Title 24 of the California Code of Regulations.

4.15.2.3 Regional/Local
City of Fairfield General Plan. 80
• Goal PFS-2. Provide responsive, efficient, and effective police and fire services that promote a high level of public safety.
○ Policy HS-2.4 Fire Department Review. Ensure the Fire Department has opportunity to review and provide appropriate conditions prior to project approval. Incorporate Fire Department input on longer-range plans related to water supply and water systems, transportation projects, and utilities.
○ Policy HS-7.2 Emergency Services Review. Continue to engage the Police and Fire departments in the development review process to ensure that projects are designed and operated in a manner that minimizes the potential for public safety and fire hazards and maximizes the potential for responsive police and fire services.

4.15.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way and would not include the development of any land uses that would be population inducing. Therefore, both alignments are presumed to have similar impacts to public services and are analyzed together in this section. 80 City of Fairfield. 2024e. City of Fairfield General Plan, Open Space, Conservation, and Recreation Element. p. 6-29. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/12145/ 638718493339670000 (accessed February 13, 2026).

Page 332 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-189 a. Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered governmental facilities, need for new or physically altered governmental facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times or other performance objectives for any of the public services:
i. Fire protection?
Less Than Significant Impact. The Project involves expansion of the existing NBRWTP and construction of a new treated-water transmission pipeline along either the Linear Trail Pipeline Alignment or the Peabody Road Pipeline Alignment. Construction activities would temporarily increase the presence of workers, vehicles, construction equipment, and potential ignition sources within the Project area. In addition, operation of the expanded facility would include electrical equipment, chemical storage facilities, ozone generation systems, and a microgrid system consisting of battery energy storage and emergency generators, all of which would be designed and operated in accordance with applicable fire and life safety requirements.

The NBRWTP currently receives fire protection services from the FFD, while areas within Vacaville and along the pipeline alignments would continue to be served by the appropriate local fire protection agencies. The pipeline facilities would be installed underground and would not create occupied structures or land uses requiring ongoing fire protection services. Although construction could result in temporary demands for emergency response services, these demands would be short-term and within the service capabilities of existing fire protection providers.

The Project would be required to comply with applicable provisions of the California Fire Code, California Building Code, local fire agency requirements, hazardous material regulations, and emergency access standards. Project design would incorporate appropriate fire prevention, suppression, monitoring, and emergency response measures, and coordination with local fire agencies would occur during Project design and construction as necessary. Because the Project would not generate substantial new population, create a substantial increase in demand for fire protection services, or require the construction or expansion of fire stations or other fire protection facilities to maintain acceptable service ratios or response times, impacts related to fire protection services would be less than significant.
ii. Police protection?
Less Than Significant Impact. The Project would not introduce new residents, employment centers, or other population-generating land uses that would substantially increase demand for police services. Construction of the NBRWTP improvements and either the Linear Trail Pipeline Alignment or the Peabody Road Pipeline Alignment would result in temporary increases in construction workers, equipment, material deliveries, and site access activities. Construction activities on the Project site have the potential to attract criminals that may be attracted to construction equipment and/or vehicles with gasoline and diesel fuel at the Project site, and/or unsecured construction materials. Construction equipment would be stored in well-lit areas, and smaller equipment would be secured to reduce pilfering by trespassers. Additionally, the Project site is located in an area already patrolled by the Fairfield and Vacaville Police Departments. Construction of the Project

Page 333 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -190 would not result in a demand for additional police services or significantly impact existing service ratios or response times.

The NBRWTP maintains controlled access, perimeter security measures, and operational oversight that limit the potential for security-related incidents. The completed transmission pipeline would be underground and would not create new occupied facilities requiring ongoing law enforcement services. Operation of the expanded NBRWTP could require up to 17 additional employees, subject to refinement during final design and operational planning. Therefore, the Project would not induce a substantial increase in population at the Project site or in surrounding areas. Furthermore, proposed operations would be similar to existing conditions and the Project would not introduce new land uses that would result in demand for more police protection services. Existing law enforcement agencies serving Fairfield, Vacaville, and surrounding areas would continue to provide coverage to the Project area. Because the Project would not generate substantial new demand for police protection services or require the construction or expansion of police facilities to maintain acceptable service ratios or response times, impacts would be less than significant. iii. Schools?
No Impact. The Project consists of improvements to an existing NBRWTP and construction of a new underground transmission pipeline. The Project would not include residential development, create housing opportunities, or otherwise induce substantial population growth that could increase student enrollment within the Fairfield-Suisun Unified School District, Vacaville Unified School District, or other local educational facilities. Construction activities would be temporary and would not result in a permanent increase in school-aged population. Because the Project would not generate additional demand for school facilities or require construction or expansion of schools, no impact would occur.
iv. Parks?
No Impact. The Project would not introduce new residents or population-generating land uses that would increase demand for neighborhood parks, community parks, trails, recreational facilities, or open space resources. Construction activity would be temporary and limited to the NBRWTP site and nearby roadways. Operation of the expanded NBRWTP could require up to 17 additional employees, subject to refinement during final design and operational planning. Project generated employees may increase the use of nearby parks and facilities during lunch breaks or after-work hours. However, any increased usage of nearby parks and facilities would be minimal given the relatively low numbers of employees on the Project site. Therefore, the provision of new or physically altered park facilities would not be necessary. Because the Project would not increase the population served by local parks and recreation facilities or require the construction or expansion of park facilities, no impact would occur.
v. Other public facilities?
No Impact. The Project would not generate substantial new population, employment, or land uses that would increase demand for other public facilities, including libraries, community centers, government offices, maintenance facilities, or other civic services. The NBRWTP improvements and

Page 334 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-191 underground pipeline facilities would support existing and planned water service demands within established service areas but would not create new demands for public facilities beyond those already anticipated in adopted planning documents. Existing public facilities would continue to operate under baseline conditions, and no new or expanded public facilities would be required as a result of the Project. Therefore, no impact would occur.

4.15.4 Mitigation Measures
No mitigation measures are warranted.

Page 335 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -192

4.16 RECREATION
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
a. Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
b. Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment?

4.16.1 Baseline Conditions
The City of Fairfield (City) maintains diverse and well-established parks, trails, and recreation system that serves its residents and surrounding communities. Facilities operated by the Fairfield Parks and Recreation Department include neighborhood parks, community parks, a large regional open‐space park such as the Rockville Hills Regional Park, which is approximately 633 acres and features trails, oak woodlands, and rock outcrops. Multi-use paved bike and walking trails such as the Fairfield Linear Park trail provide active‐transportation and recreation opportunities throughout Fairfield. The broader open-space and trail network extends to regional open lands managed by the County of Solano and the City, providing access to outdoor recreation in the Suisun Valley/Suisun Marsh transitional zone.

4.16.2 Regulatory Requirements

4.16.2.1 Federal Regulations
There are no federal policies or regulations related to public services that are applicable to the Project.

4.16.2.2 State Regulations
California Landscaping and Lighting Districts Act. The California Landscaping and Lighting Act of 1972 (Streets and Highways Code Sections 22500–22679) authorizes local agencies to establish Landscaping and Lighting Districts to finance the installation, operation, and maintenance of public improvements, including street lighting, landscaping, and related facilities within a defined district.

Improvements funded under this act may include lighting systems intended to enhance public safety, traffic circulation, and community aesthetics.

Lighting installed and maintained through Landscaping and Lighting Districts must comply with applicable state and local regulations, including Title 24 Building Energy Efficiency Standards and local outdoor lighting ordinances, where applicable. The act provides the statutory framework for the funding and administration of public lighting improvements but does not exempt such improvements from compliance with the California Environmental Quality Act or other environmental and energy efficiency.

Page 336 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-193

4.16.2.3 Regional/Local Regulations
There are no regional/local policies or regulations related to public services that are applicable to the Project.

4.16.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way and would not include the development of any land uses that would be population inducing. Therefore, both alignments are presumed to have similar impacts to recreation and are analyzed together in this section. a. Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated?
No Impact. The Project would not result in new residential development, population growth, or employment that would significantly increase demand for public parks or recreational facilities.

Construction activity would be temporary and limited to the NBRWTP site and nearby roadways.

Operation of the expanded NBRWTP could require up to 17 additional employees, subject to refinement during final design and operational planning. Project generated employees may increase the use of nearby parks and facilities during lunch breaks or after-work hours. However, any increased usage of nearby parks and facilities would be minimal given the relatively low numbers of employees on the Project site. Therefore, the Project would not increase the use of neighborhood or regional parks or contribute to their physical deterioration. b. Does the project include recreational facilities or require the construction or expansion of recreational facilities which might have an adverse physical effect on the environment? No Impact. The Project does not include the development of new recreational amenities, nor would it require the construction or expansion of existing recreational facilities. All Project activities would occur within previously disturbed or developed areas associated with the NBRWTP and within existing road corridors. The Project would not develop land uses that would lead to a significant increase in the demand for parks and recreational facilities, which would require the construction or expansion of recreational facilities that might have an adverse effect on the environment.

Therefore, there would be no impacts related to the construction or expansion of recreational facilities.

4.16.4 Mitigation Measures
No mitigation measures are warranted.

Page 337 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -194

4.17 TRANSPORTATION
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Conflict with a program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities?
b. Conflict or be inconsistent with CEQA Guidelines §15064.3, subdivision (b)?
c. Substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)?
d. Result in inadequate emergency access?

4.17.1 Baseline Conditions
The North Bay Regional Water Treatment Plant (NBRWTP) is on the eastern periphery of Fairfield and is accessed primarily via Waterworks Lane and Peabody Road. These roadways connect to Interstate 80, which provides regional access between Fairfield, Vacaville, and surrounding communities within Solano County. Waterworks Lane and portions of Peabody Road in the vicinity of the NBRWTP are generally two-lane roadways serving a mix of utility, agricultural, industrial, and local traffic. Existing traffic volumes in the area are generally light to moderate, reflecting the predominance of public utility facilities, agricultural lands, open space, and low-density development.

The Project includes two alternative pipeline alignments connecting the NBRWTP to Vacaville’s existing water distribution system. The Linear Trail Pipeline Alignment generally follows an existing utility corridor adjacent to the Putah South Canal and former railroad corridor known as the Linear Trail before connecting to the Vacaville distribution system near Peabody Road and Foxboro Parkway. Transportation facilities along this corridor consist primarily of maintenance access roads, utility corridors, limited local roadway crossings, and recreational trail facilities. Vehicle traffic within the corridor is generally limited to utility operations, maintenance activities, and local recreational users.

The Peabody Road Pipeline Alignment generally extends west from the NBRWTP to Peabody Road and then north along the roadway corridor toward Vacaville. Existing transportation facilities along this alignment include Peabody Road, associated intersections, agricultural access roads, roadside drainage facilities, and connections to local residential and commercial areas. Traffic volumes along Peabody Road are generally higher than those associated with the Linear Trail corridor due to its function as a local connector roadway serving residential neighborhoods, agricultural operations, businesses, and regional travelers.

Public transit service in the immediate vicinity of the NBRWTP and pipeline alignments is limited.

Fairfield and Suisun Transit and Vacaville City Coach provide transit services along major roadways within Fairfield and Vacaville; however, fixed-route transit service is not provided directly to the

Page 338 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-195 NBRWTP or most portions of the pipeline corridors. Pedestrian and bicycle facilities are generally limited near the NBRWTP but become more prevalent closer to developed portions of Fairfield and Vacaville. The Peabody Road corridor includes roadway facilities used by bicyclists and pedestrians, while portions of the Linear Trail corridor provide recreational trail access and maintenance roads used by pedestrians, bicyclists, and utility personnel.

Under existing conditions, the transportation network serving the NBRWTP and surrounding area provides adequate access for utility operations, maintenance activities, emergency response, agricultural uses, and local traffic. Emergency access is provided via Waterworks Lane, Peabody Road, and existing utility access routes consistent with applicable local agency requirements.

4.17.2 Regulatory Requirements

4.17.2.1 Federal Regulations
Americans with Disabilities Act of 1990. Titles I, II, III, IV, and V of the Americans with Disabilities Act have been codified in Title 42 of the United States Code, beginning at Section 12101. Title III prohibits discrimination on the basis of disability in “places of public accommodation” (businesses and nonprofit agencies that serve the public) and “commercial facilities” (other businesses). The regulation includes Standards for Accessible Design, which establish minimum standards for ensuring accessibility when designing and constructing a new facility or altering an existing facility.

Federal Transit Administration. The Federal Transit Administration (FTA) is an authority that provides financial and technical assistance to local public transit systems, including buses, subways, light rail, commuter rail, trolleys, and ferries. The FTA is funded by Title 49 of the United States Code, which states the FTA’s interest in fostering the development and revitalization of public transportation systems. The FTA invests approximately $12 billion annually to support and expand public transit.

4.17.2.2 State Regulations
Assembly Bill 32 (Global Warming Act of 2006) and Senate Bill 375. Assembly Bill (AB) 32, the California Global Warming Solutions Act of 2006, requires California to reduce its greenhouse gas (GHG) emissions to levels presented in the year 1990 by 2020. In response, the California Air Resources Board (CARB) is responsible for creating guidelines for this act. In 2008, CARB adopted its proposed Scoping Plan, which included the approval of Senate Bill (SB) 375 as a means of achieving regional transportation-related GHG targets. SB 375 provides guidance on how curbing emissions from cars and light trucks helps the State comply with AB 32.

Established through CARB, SB 375 lists four major components and requirements: (1) it requires regional GHG emission targets; (2) it requires creating a Sustainable Communities Strategy that provides a plan for meeting the regional targets; (3) it requires that regional housing elements and transportation plans be synchronized on 8-year schedules; and (4) it requires transportation and air pollutant emissions modeling techniques consistent with guidelines prepared by the California Transportation Commission.

Page 339 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -196 Assembly Bill 1358 (Complete Streets). The California Complete Streets Act requires general plans updated after January 30, 2011, to include Complete Streets policies so that roadways are designed to safely accommodate all users, including bicyclists, pedestrians, transit riders, children, the elderly, and persons with disabilities, as well as motorists. The goal of this act is to encourage cities to rethink policies that emphasize automobile circulation and prioritize motor vehicle improvements and come up with creative solutions that emphasize all modes of transportation. Complete Streets roadways allow for more transportation options, more non-single occupancy vehicles, and less traffic congestion. Additionally, increased transit ridership, walking, and biking can reduce air pollution while improving the overall travel experience for road users.

Although there is no standard for a Complete Streets design, it generally includes one or more of the following features: bicycle lanes, wide shoulders, well-designed and well-placed crosswalks, crossing islands in appropriate mid-block locations, bus pullouts or special bus lanes, audible and accessible pedestrian signals, sidewalk bulb-outs, center medians, street trees, planter strips, and groundcover.

Senate Bill 743. On September 27, 2013, Governor Jerry Brown signed SB 743 into law and codified a process that changed transportation impact analysis as part of CEQA compliance. SB 743 directs the California Governor’s Office of Planning and Research (OPR) to administer new CEQA guidance for jurisdictions that removes automobile vehicle delay and level of service (LOS) or other similar measures of vehicular capacity or traffic congestions from California Environmental Quality Act (CEQA) transportation analysis. Rather, it requires the analysis of vehicle miles traveled (VMT) or other measures that “promote the reduction of greenhouse gas emissions, the development of multi-modal transportation networks, and a diversity of land uses,” to be used as a basis for determining significant impacts to circulation in California. The goal of SB 743 is to appropriately balance the needs of congestion management with statewide goals related to reducing GHG emissions, encourage infill development, and promote public health through active transportation.

California Department of Transportation (Caltrans). Caltrans has not established formal VMT significance thresholds, although in May 2020 it released the VMT-Focused Transportation Impact Study Guide (TISG) that refers to guidance provided in the OPR Technical Advisory, 81 which recommends VMT per capita thresholds 15 percent below existing city or regional levels. The Caltrans TISG also refers to the OPR Technical Advisory guidance on the types of projects that can be presumed to have a less than significant transportation impact. The TISG reiterates that automobile delay is no longer considered a significant impact on the environment within CEQA transportation analysis.
81 Governor’s Office of Planning and Research (OPR). 2018. Technical Advisory on Evaluating Transportation Impacts in CEQA (OPR Technical Advisory). December.

Page 340 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-197

4.17.2.3 Regional/Local Regulations
City of Fairfield General Plan. 82
• Goal CIR-2. Achieve a coordinated regional and local transportation system that minimizes traffic congestion and safely and efficiently serves users. • Goal CIR-3. Manage the City’s transportation system to minimize congestion, improve the flow of traffic, improve air quality, and reduce vehicle miles traveled. ○ Policy CIR-3.1 Vehicle Miles Traveled Screening Criteria. Evaluate new development and redevelopment projects for compliance with adopted VMT significance thresholds and transportation impact screening criteria. All projects residential projects that generate more than 50 peak hour trips (AM or PM) and nonresidential projects that generate more than 100 peak hour trips must prepare a local transportation analysis. In the event a project is unable to screen for VMT, the developer shall be required to perform an LOS analysis. • Goal SUS-8. Support programs to reduce auto dependency and GHG emissions from personal vehicles.
○ SUS-8.4. Electric Vehicle Charging at City-Owned Facilities. Develop a strategic plan to expand electric vehicle charging infrastructure at City-owned facilities and work with electricity providers to over-come barriers to Electric Vehicle (EV) charging provision.

4.17.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Each alignment would traverse a range of conditions, including developed and unpaved areas of the water treatment NBRWTP, across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. For resource areas where environmental conditions vary between the alignments and could result in different impact outcomes, the analysis distinguishes between the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment, as appropriate. a. Would the project conflict with a program plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and pedestrian facilities? Less Than Significant Impact. The Project would include NBRWTP expansion and pipeline improvements within existing roadways, all within the current NBRWTP footprint or existing public rights-of-way. No new roadway alignments, bicycle lanes, or pedestrian facilities would be constructed, nor would existing arterials or transit facilities be permanently altered. Temporary 82 City of Fairfield. 2024f. City of Fairfield Climate Action Plan. December. Website:
https://www.fairfield.ca.gov/home/showpublisheddocument/12085/638701095833270000 (accessed June 2026).

Page 341 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -198 construction activities may involve minor lane closures, but these would be coordinated with the City’s Public Works Department and would comply with City circulation plans, transit policies, and bicycle/pedestrian standards.

Linear Trail Pipeline Alignment. The NBRWTP improvements would be within an existing developed utility facility and would not modify the surrounding roadway network, transit routes, bicycle facilities, or pedestrian infrastructure. Construction activities would generate temporary vehicle trips associated with workers, equipment, and material deliveries; however, access would occur primarily via existing roadways serving the facility, and traffic volumes would be temporary and limited in duration.

The Linear Trail Pipeline Alignment would generally follow an existing utility corridor adjacent to the Putah South Canal and former railroad corridor. Construction activities could temporarily affect access along portions of the Linear Trail corridor, utility access roads, and local roadway crossings where trenching or pipeline installation occurs. The alignment may also temporarily affect recreational trail users, bicyclists, or pedestrians in localized areas where construction activities occur adjacent to or across trail facilities. However, any closures or detours would be temporary and implemented in coordination with applicable agencies. Following construction, the pipeline would be installed underground, disturbed areas would be restored, and existing circulation facilities would remain available for their intended use. The Project would not permanently alter roadway alignments, transit facilities, bicycle routes, pedestrian facilities, or adopted circulation plans and policies.

Peabody Road Pipeline Alignment. The Peabody Road Pipeline Alignment would be constructed primarily within or adjacent to the existing Peabody Road corridor. Construction activities could result in temporary lane closures, shoulder closures, traffic control measures, and localized disruptions to bicycle and pedestrian travel within the roadway corridor. Portions of the alignment are near existing residential, commercial, and agricultural uses that rely on Peabody Road for access. However, construction-related traffic impacts would be temporary and would be managed through traffic control plans, signage, lane management measures, and coordination with the City, City of Vacaville, County of Solano, and other applicable agencies, as appropriate.

Upon completion, the transmission pipeline would be underground and would not permanently modify roadway geometry, reduce roadway capacity, eliminate bicycle or pedestrian facilities, alter transit routes, or conflict with adopted transportation plans and policies. Existing circulation patterns would be restored following construction, and operation of the pipeline would generate only occasional maintenance-related vehicle trips.

Because the Project would not result in permanent changes to the circulation system, would not conflict with adopted transportation plans, policies, or ordinances, and would only result in temporary construction-related disruptions that can be managed through standard traffic control measures, impacts would be less than significant.

Page 342 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-199 b. Would the project conflict or be inconsistent with CEQA Guidelines §15064.3, subdivision (b)? Less Than Significant Impact. State CEQA Guidelines Section 15064.3 requires transportation impacts to be evaluated based on VMT rather than automobile delay or LOS. The City adopted the Fairfield Guidelines for Project VMT Screening Transportation Analysis in 2020, which establish screening criteria for determining whether a project may have a significant transportation impact.

Under the City’s guidelines, projects that generate fewer than 110 net new daily vehicle trips are presumed to have a less than significant impact related to VMT and generally do not require preparation of a detailed VMT analysis.

The Project consists of the expansion and modernization of an existing regional water treatment facility and construction of an underground treated-water transmission pipeline. The Project would not create new residential units, commercial development, industrial facilities, schools, recreational uses, or other land uses that would generate substantial new vehicle travel. Rather, the Project is intended to improve water treatment capacity, operational reliability, and system resiliency to serve existing and planned development within the adopted service areas of Fairfield and Vacaville. As a public utility infrastructure Project, the NBRWTP expansion would support continued operation of an existing facility and would not function as a destination that attracts customers or visitor trips.

Although construction of the treatment plant improvements and either pipeline alignment would generate temporary workers, equipment, and material delivery trips, these construction-related trips are temporary in nature and are not considered part of the long-term operational VMT analysis under State CEQA Guidelines Section 15064.3.

The NBRWTP expansion would not substantially increase long-term staffing, customer trips, or daily operational vehicle travel. Operation of the expanded NBRWTP could require up to 17 additional employees, subject to refinement during final design and operational planning. Assuming two daily commute trips per employee, the additional staffing would generate approximately 34 daily vehicle trips. Additional operational activities, including chemical deliveries, maintenance vehicles, and service calls, would occur periodically but are expected to represent only a minor increase over existing conditions. Collectively, employee, maintenance, and service-related trips associated with operation of the expanded facility would remain substantially below the City’s 110-trip screening threshold.

Similarly, the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment would not generate ongoing vehicle travel following construction. Once installed, the underground transmission pipeline would require only periodic inspection, monitoring, and maintenance activities, resulting in infrequent maintenance vehicle trips.

Because the Project would generate substantially fewer than 110 net new daily vehicle trips, would not create land uses that induce substantial vehicle travel, and would not result in substantial increases in long-term operational VMT, the Project satisfies the City’s adopted screening criteria and is presumed to have a less than significant transportation impact. Therefore, the Project would not conflict with State CEQA Guidelines Section 15064.3 or applicable local transportation policies, and impacts related to VMT would be less than significant.

Page 343 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -200 c. Would the project substantially increase hazards due to a geometric design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? No Impact. The Project does not involve any roadway modifications. Routine NBRWTP operations and construction traffic would remain compatible with existing roadway geometry and agricultural traffic in the area. Therefore, there would be no impact. d. Would the project result in inadequate emergency access? Less Than Significant Impact. The NBRWTP is accessed primarily via Waterworks Lane and Peabody Road, both of which provide existing emergency ingress and egress for facility operations and emergency response. The Project would not permanently modify roadway alignments, eliminate access points, or alter circulation patterns in a manner that would impair emergency vehicle access to the NBRWTP, adjacent properties, or surrounding communities. Upon completion, all Project facilities, including the expanded treatment plant infrastructure and underground transmission pipeline, would maintain existing emergency access conditions.

Construction of the NBRWTP improvements and either the Linear Trail Pipeline Alignment or the Peabody Road Pipeline Alignment could result in temporary traffic disruptions associated with lane closures, shoulder closures, equipment staging, material deliveries, trenching activities, and temporary detours. The potential for temporary impacts would be greater along the Peabody Road Pipeline Alignment due to its location within an active roadway corridor that serves local residents, businesses, agricultural operations, and emergency service providers. Construction along the Linear Trail Pipeline Alignment could temporarily affect access along utility corridors, maintenance roads, and trail crossings but would have more limited interaction with the public roadway network.

To ensure emergency access is maintained throughout construction, the Project would be required to obtain applicable encroachment permits and traffic control approvals from the City, City of Vacaville, Solano County, and other affected agencies, as appropriate. Traffic control plans, lane closure requests, detour routes, and construction access plans would be reviewed and approved by the applicable Public Works Departments and coordinated with fire, police, emergency medical service providers, and other emergency response agencies. Construction activities would be required to maintain emergency vehicle access at all times, provide advance notification of temporary roadway restrictions, and comply with applicable local, state, and federal traffic control standards, including the California Manual on Uniform Traffic Control Devices.

Because any construction-related impacts to emergency access would be temporary, subject to agency review and approval, and managed through implementation of approved traffic control and emergency access measures, and because all Project facilities would maintain existing emergency access conditions once operational, the Project would not result in inadequate emergency access.

Therefore, impacts would be less than significant.

4.17.4 Mitigation Measures
No mitigation measures are warranted.

Page 344 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-201

4.18 TRIBAL CULTURAL RESOURCES
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section
5020.1(k)? Or
ii. A resource determined by the lead agency, in its
discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1? In applying the criteria set forth in subdivision (c) of Public
Resource Code Section 5024.1, the lead agency shall
consider the significance of the resource to a California Native American tribe.

4.18.1 Baseline Conditions
The North Bay Regional Water Treatment Plant (NBRWTP) and associated pipeline alignments are within the ancestral and traditional territory of Native American groups historically associated with Solano County, including the Patwin (Southern Wintun) and Yocha Dehe peoples with cultural affiliations to the Suisun Marsh, Suisun Valley, and Putah Creek regions 83. The Project includes the existing developed NBRWTP site, as well as the Linear Trail Pipeline Alignment and the Peabody Road Pipeline Alignment, which traverse a combination of developed utility corridors, roadway rights-of-way, agricultural lands, open space areas, and drainage features. Portions of the Project area are near waterways and landscape features that have historically supported Native American settlement, travel, resource gathering, and other cultural activities.

The NBRWTP site has been substantially disturbed by previous construction and operation of water treatment facilities, including treatment basins, buildings, pipelines, access roads, and associated utility infrastructure. However, portions of the pipeline alignments traverse areas that have experienced varying levels of disturbance and include undeveloped or previously undisturbed areas where buried tribal cultural resources may be present. Notable features within or adjacent to the Project area include Union Creek, the Putah South Canal, South Putah Creek, and surrounding open 83 California Native American Heritage Commission (NAHC). 2026. Sacred Lands File Search Results for the North Bay Regional Water Treatment Plant Expansion Project and Associated Pipeline Alignments.

Sacramento, California.

Page 345 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -202 space areas, which may have cultural significance due to their proximity to historical water resources and travel corridors.

The Project is subject to the requirements of Assembly Bill (AB) 52 and Public Resources Code (PRC) Section 21074, which define tribal cultural resources and require consideration of impacts to resources that are significant to California Native American tribes. 84 4.18.2 Regulatory Requirements

4.18.2.1 Federal Regulations
Archaeological Resources Protection Act. The Archaeological Resources Protection Act was enacted in 1979 with the purpose of securing the protection of archaeological resources and sites on public lands and Native American lands, and to foster increased cooperation and exchange of information between governmental authorities, the professional archaeological community, and private individuals.

Native American Graves Protection and Repatriation Act. The Native American Graves Protection and Repatriation Act (NAGPRA) was passed in 1990 with the purpose of outlining a process for museums and federal agencies to return certain Native American cultural items (e.g., human remains, funerary objects, sacred objects, or objects of cultural patrimony) to lineal descendants and culturally affiliated Indian tribes. NAGPRA also establishes procedures for the inadvertent discovery or planned excavation of Native American cultural items on federal or tribal lands.

Although these provisions do not apply to discovery or excavations on private or State lands, the collection portions of NAGPRA may apply to cultural items if they are under the control of an institution that receives federal funding. NAGPRA also makes it a criminal offense to traffic in Native American human remains without right of possession or in cultural items obtained in violation of NAGPRA.

4.18.2.2 State Regulations
Assembly Bill 52. AB 52, the Native American Historic Resource Protection Act, sets forth a proactive approach intended to reduce the potential for delay and conflicts between Native American and development interests. Projects subject to AB 52 are those that file a notice of preparation for an EIR or notice of intent to adopt a negative or mitigated negative declaration on or after July 1, 2015.

AB 52 adds tribal cultural resources (TCR) to the specific cultural resources protected under CEQA.

Under AB 52, a TCR is defined as a site, feature, place, cultural landscape (must be geographically defined in terms of size and scope), sacred place, or object with cultural value to a California Native American tribe that is either included or eligible for inclusion in the California Register of Historical Resources or included in a local register of historical resources. A Native American tribe or the lead agency, supported by substantial evidence, may choose at its discretion to treat a resource as a TCR.

AB 52 also mandates lead agencies to consult with tribes, if requested by the tribe, and sets the principles for conducting and concluding consultation.
84 California Public Resources Code. Sections 21074 and 21080.3.1–21080.3.11. Assembly Bill 52 Tribal Consultation Requirements and Definition of Tribal Cultural Resources.

Page 346 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-203 Health and Safety Code 7050.5. Human Remains. Section 7050.5 of the California Health and Safety Code states that, in the event of discovery or recognition of any human remains in any location other than a dedicated cemetery, there shall be no further excavation or disturbance of the site, or any nearby area reasonably suspected to overlie adjacent remains, until the coroner of the county in which the remains are discovered has determined whether or not the remains are subject to the coroner’s authority. If the human remains are of Native American origin, the coroner must notify the Native American Heritage Commission (NAHC) within 24 hours of this identification. The NAHC will identify a Native American Most Likely Descendant to inspect the site and provide recommendations for the proper treatment of the remains and associated grave goods.

Public Resources Code 5097.98. Notification of Most Likely Descendant. Section 5097.98 of the California PRC prohibits excavation or removal of any “vertebrate paleontological site…or any other archaeological, paleontological or historical feature, situated on public lands, except with express permission of the public agency having jurisdiction over such lands.” Public lands are defined to include lands owned by or under the jurisdiction of the State or any city, county, district, authority or public corporation, or any agency thereof. Section 5097.5 states that any unauthorized disturbance or removal of archaeological, historical, or paleontological materials or sites located on public lands is a misdemeanor.

California’s Native American Graves Protection and Repatriation Act of 2001. AB 978 (AB 978- Steinberg, 2001) established the State of California’s Native American Graves Protection and Repatriation Act of 2001, a counterpart to the federal Native American Graves Protection and Repatriation Act of 1990 (25 United States Code [USC] Section 3001 et seq.). It called for creation of a 10-member Repatriation Oversight Commission appointed by the Governor and a process with penalties and enforcement procedures for repatriation of Native American human and cultural remains originating in California.

Assembly Bill 4239 (Chapter 1332, Statutes of 1976). In 1976, the California Legislature passed AB 4239, creating the NAHC, which is responsible for identifying and categorizing Native American cultural resources as well as preventing damage to designated sacred sites and associated artifacts and remains. Legislation passed in 1982 authorized the NAHC to identify a Most Likely Descendant when Native American remains are found outside the boundaries of a designated cemetery. A Most Likely Descendant has the authority to make recommendations in regard to the treatment and disposition of the discovered remains.

4.18.2.3 Regional/Local Regulations
There are no regional/local policies or regulations related to public services that are applicable to the Project.

4.18.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Both pipeline alignments would be constructed primarily within and adjacent to previously disturbed areas, existing roadways, and rights-of-way and would require

Page 347 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -204 consistent or similar construction and operational maintenance activities. Therefore, both alignments are presumed to have similar impacts to tribal cultural resources and are analyzed together in this section.
a. Would the project cause a substantial adverse change in the significance of a tribal cultural resource, defined in Public Resources Code Section 21074 as either a site, feature, place, cultural landscape that is geographically defined in terms of the size and scope of the landscape, sacred place, or object with cultural value to a California Native American tribe, and that is:
i. Listed or eligible for listing in the California Register of Historical Resources, or in a local register of historical resources as defined in Public Resources Code Section 5020.1(k)? Or ii. A resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of Public Resources Code Section 5024.1? In applying the criteria set forth in subdivision (c) of Public Resource Code Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.

Less Than Significant with Mitigation Incorporated. Pursuant to AB 52, the City initiated tribal consultation with Native American tribes that requested notification of projects within the area.

Consultation letters were distributed on March 12, 2026, with follow-up correspondence provided on March 26, 2026. Eleven letters were mailed from the City to the following six Tribes. • Cachil Dehe Band of Wintun Indians of the Colusa Indian Community • Confederated Villages of Lisjan Nation
• Cortina Rancheria - Kletsel Dehe Band of Wintun Indians • Grindstone Rancheria of Wintun-Wailaki
• Guidiville Rancheria of California
• Yocha Dehe Wintun Nation
Supplemental notification letters were distributed on April 29, 2026, to inform tribes of the additional Peabody Road Pipeline Alignment under consideration. The supplemental notification was provided to ensure that Tribes received a complete and accurate description of the Project, including all currently identified pipeline alignment alternatives and associated areas of potential ground disturbance. The additional outreach was intended to support continued meaningful consultation and provide Tribes the opportunity to evaluate and comment on potential impacts associated with the expanded Project considerations.

Two tribes responded to the notification, with the Yocha Dehe Wintun Nation formally requesting consultation with the City.

The City conducted a tribal consultation meeting on May 4, 2026, with the Yocha Dehe Wintun Nation to discuss the Project and potential tribal cultural resource concerns. Consultation with the Yocha Dehe Wintun Nation identified several areas of cultural sensitivity within the Project vicinity.

The tribe requested tribal monitoring during ground-disturbing activities and execution of a Tribal Monitoring Agreement that includes procedures for tribal monitoring and the treatment of inadvertent discoveries and human remains. The parties mutually agreed to conduct a follow-up

Page 348 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-205 consultation meeting once the Pipeline Alignment is finalized in order to further evaluate potential impacts and monitoring requirements associated with the selected alignment.

The Project includes expansion of the existing NBRWTP and construction of a new treated-water transmission pipeline along either the Linear Trail Pipeline Alignment or the Peabody Road Pipeline Alignment. Implementation of the Project would require substantial ground-disturbing activities, including excavation for treatment facilities, foundations, pipelines, utility connections, staging areas, and other associated infrastructure. Although the NBRWTP site has been substantially disturbed by previous development and operation of the facility, portions of the pipeline alignments traverse open space, utility corridors, agricultural lands, drainage features, and previously undeveloped areas that may contain buried tribal cultural resources. In particular, the Linear Trail Pipeline Alignment traverses areas near Union Creek and the Putah South Canal, while portions of the Project area occur near South Putah Creek and other locations identified during tribal consultation as culturally sensitive.

No tribal cultural resources listed in or formally determined eligible for listing in the California Register of Historical Resources have been identified within the Project footprint. However, AB 52 consultation and the proximity of the Project to historically important waterways and cultural landscapes indicate the potential for previously unidentified tribal cultural resources to be present within undisturbed subsurface deposits. Ground-disturbing activities associated with the Project could result in the inadvertent discovery, disturbance, damage, or destruction of tribal cultural resources that may qualify as tribal cultural resources pursuant to Public Resources Code Section 21074. Therefore, impacts to tribal cultural resources could be potentially significant.

Implementation of Mitigation Measures CUL-1 and CUL- 5 would reduce potential Project-related impacts to a less than significant level. The mitigation measure would require execution of a Tribal Monitoring Agreement with the Yocha Dehe Wintun Nation, or another consulting tribe identified through the AB 52 process, prior to commencement of ground-disturbing activities in culturally sensitive areas. The measure would also require tribal monitoring during specified ground-disturbing activities, coordination between tribal monitors and the City, authority to temporarily halt work in the vicinity of potential discoveries, evaluation of discovered resources by qualified cultural resource specialists and tribal representatives, and implementation of culturally appropriate avoidance, preservation, treatment, or documentation measures, as appropriate. In addition, procedures for the treatment of inadvertent discoveries of tribal cultural resources and human remains would be implemented in accordance with applicable State laws and the executed Tribal Monitoring Agreement.

With implementation of Mitigation Measures CUL-1 and CUL-5, the Project would avoid or minimize damage to tribal cultural resources and ensure that any discovered resources are appropriately identified, evaluated, and treated in consultation with affiliated tribes. Therefore, impacts to tribal cultural resources would be less than significant with mitigation incorporated.

4.18.4 Mitigation Measures
See Cultural Resources Section 4.5 for Mitigation Measures CUL-1 through CUL-5.

Page 349 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD - V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -206

4.19 UTILITIES AND SERVICE SYSTEMS
Potentially
Significant
Impact
Less Than
Significant with
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
Would the project:
a. Require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater
drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
b. Have sufficient water supplies available to serve the project and reasonably foreseeable future development during
normal, dry and multiple dry years?
c. Result in a determination by the wastewater treatment provider which serves or may serve the project that it has adequate capacity to serve the project’s projected demand in addition to the provider’s existing commitments?
d. Generate solid waste in excess of State or local standards, or in excess of the capacity of local infrastructure, or otherwise impair the attainment of solid waste reduction goals?
e. Comply with federal, state, and local management and reduction statutes and regulations related to solid waste?

4.19.1 Baseline Conditions
The North Bay Regional Water Treatment Plant (NBRWTP) is a critical regional public utility facility serving Fairfield, providing treated potable water to municipal, commercial, and industrial customers. The NBRWTP is within a semi-urbanized area characterized by residential neighborhoods, open space, and service-industrial uses. The following discussion provides existing infrastructure, capacity, and service delivery for water, wastewater, stormwater, and other municipal services.

4.19.1.1 Water Supply
The NBRWTP currently treats and distributes potable water drawn primarily from the North Bay Aqueduct, a component of the California State Water Project, supplemented by local groundwater supplies. Existing treatment capacity at the NBRWTP is approximately 52.7 million gallons per day (mgd). The water system includes treatment basins, chemical feed and storage facilities, pumps, and high-capacity transmission pipelines. Baseline conditions reflect a fully operational facility providing reliable municipal water service to the existing populations of both Fairfield and Vacaville.

4.19.1.2 Wastewater and Sanitary Systems
The City of Fairfield (City) owns and operates a comprehensive wastewater collection, treatment, and disposal system serving residential, commercial, and industrial users within the city limits and portions of surrounding unincorporated areas. Wastewater is collected through a network of gravity sewer mains, force mains, and lift stations, which convey flows to the Fairfield-Suisun Sewer District (FSSD) Wastewater Treatment Plant (WTP), located at 1010 Chadbourne Road in the southern

Page 350 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-207 portion of Fairfield. The FSSD is a regional joint power authority serving both Fairfield and Suisun City.

The FSSD WTP has a permitted treatment capacity of approximately 23.7 mgd and provides secondary and tertiary treatment, including activated sludge, filtration, and disinfection prior to discharge. Treated effluent is released to Boynton Slough, which connects to Suisun Marsh, under permits issued by the San Francisco Bay Regional Water Quality Control Board. The facility also produces recycled water, which is distributed to select industrial and landscape irrigation users, contributing to regional water reuse objectives. The City’s wastewater system operates well within permitted capacity and complies with applicable discharge and performance standards established under its NPDES permit (Order No. R2-2018-0032).

The NBRWTP is within the City’s wastewater service area. The NBRWTP itself generates minimal sanitary wastewater. Small volumes of domestic wastewater from administrative facilities are conveyed to the City’s sewer system for treatment at the FSSD facility.

4.19.1.3 Stormwater and Drainage
The City operates and maintains a municipal storm drainage system designed to collect and convey stormwater runoff from developed areas to local creeks, channels, and detention basins. The City’s storm drainage system consists of curb inlets, underground storm drainpipes, open channels, detention and retention basins, and pump stations that discharge to the Suisun Marsh watershed and associated tributaries, including Lynch Canyon Creek, Laurel Creek, McCoy Creek, and Union Creek. Stormwater management in Fairfield is guided by the City’s Storm Drain Master Plan and implemented in accordance with the Municipal Regional Stormwater National Pollutant Discharge Elimination System (NPDES) Permit (Order Nos. R2-2022-0018 and Amendment R2-2023-0019, NPDES Permit No. CAS612008) issued by the San Francisco Bay Regional Water Quality Control Board (RWQCB).

The City’s storm drainage infrastructure functions primarily to control localized flooding and convey runoff to natural and engineered drainage channels. The City also enforces stormwater quality standards and low impact development requirements through its Stormwater Management and Discharge Control Ordinance (Fairfield Municipal Code Chapter 12E), which regulates construction and post-construction discharges to reduce pollutants entering the storm drain system.

The NBRWTP property is served by a stormwater drainage system that directs runoff to on-site detention basins. The site falls within the City’s San Francisco Bay Region Municipal Regional Stormwater NPDES Permit jurisdiction, and baseline conditions reflect compliance with existing stormwater management standards, including the NPDES permit requirements. Runoff from impervious surfaces is minimal relative to the regional system, and current operations maintain standard erosion control and drainage measures.

4.19.1.4 Other Utilities
The NBRWTP is connected to electricity, natural gas, telecommunication, and backup power systems to support treatment operations. Electrical service is provided by the Pacific Gas and Electric Company, including redundant circuits and backup generators to ensure uninterrupted operations.

Page 351 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -208 Telecommunications and Supervisory Control and Data Acquisition systems support remote monitoring and process control. The NBRWTP is a fully functioning, utility-intensive facility with infrastructure capacity sufficient to maintain current operations without interruption.

4.19.2 Regulatory Requirements

4.19.2.1 Federal Regulations
Clean Water Act. In 1972, Congress amended the Federal Water Pollution Control Act (usually referred to as the Clean Water Act [CWA]), making the addition of pollutants to the waters of the United States from any point source unlawful unless the discharge complies with an NPDES permit.

Known today as the CWA, Congress has amended this act several times. The objective of the CWA is “to restore and maintain the chemical, physical, and biological integrity of the Nation’s waters.” In the 1987 amendments, Congress directed dischargers of storm water from municipal and industrial/construction point sources to comply with the NPDES permit program. Important CWA sections are:
• Sections 303 and 304 require states to promulgate water quality standards, criteria, and guidelines and have those standards approved by the United States Environmental Protection Agency (EPA).

Water quality standards consist of designated beneficial uses for a particular waterbody (e.g., wildlife habitat, agricultural supply, fishing), along with water quality criteria necessary to support those uses. Water quality criteria are set concentrations or levels of constituents (e.g., lead, suspended sediment, and fecal coliform bacteria) or narrative statements that represent the quality of water that support a particular use. Because California had not established a complete list of acceptable water quality criteria for toxic pollutants, the EPA Region IX established numeric water quality criteria for toxic constituents in the form of the California Toxics Rule.

When designated beneficial uses of a particular waterbody are being compromised by water quality, Section 303(d) of the CWA requires identifying and listing that waterbody as impaired.

Once a waterbody has been deemed impaired, a total maximum daily load (TMDL) must be developed for each impairing water quality constituent. A TMDL is an estimate of the total load of pollutants from point, nonpoint, and natural sources that a waterbody may receive without exceeding applicable water quality standards (often with a “factor of safety” included, which limits the total load of pollutants to a level well below that which could cause the standard to be exceeded). Once established, the TMDL is allocated among current and future dischargers into the waterbody.

The SWRCB, in compliance with Section 303(d) of the CWA, prepared the proposed 2024 list of impaired waterbodies in California. The State Water Resources Control Board (SWRCB) partially approved the 2024 California Integrated Report (CWA Section 303(d) List/305(b) Report on December 13, 2024. The 303(d) list includes a priority schedule for the development of TMDL implementation for each contaminant impacting the waterbody. The current list of impairments for the project site receiving waters are provided in Section 4.10.1.3 of Section 4.10, Hydrology and Water Quality.

Page 352 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-209 • Section 401 Certification requires an applicant for a federal license or permit to conduct any activity that may result in a discharge to waters of the United States to obtain certification from the State that the discharge will comply with other provisions of the act. (This is most frequently required in tandem with a Section 404 permit request and is discussed further below.) • Section 402 establishes the NPDES, a permitting system for the discharges (except for dredge or fill material) of any pollutant into waters of the United States. The EPA delegated the implementation and administration of the NPDES program to the SWRCB. The SWRCB established nine Regional Water Quality Control Boards (RWQCBs). The SWRCB enacts and enforces the federal NPDES program and all water quality programs and regulations that cross regional boundaries. The nine RWQCBs enact, administer, and enforce all programs, including NPDES permitting, within their jurisdictional boundaries. Section 402(p) requires permits for discharges of stormwater from industrial, construction, and MS4s. To comply with the MS4 permits, storm water pollution controls must be implemented for construction and operational activities that discharge either directly to surface waters or indirectly through separate municipal storm drains. Pollution control is achieved by establishing engineering measures that have been designed, tested, and successfully implemented throughout the past decades, such as detention basins and sediment traps, during both the construction period and the operational phases of a project.

Direct discharges of pollutants into waters of the United States are not allowed except in accordance with the NPDES program established in Section 402 of the CWA. • Section 404 establishes a permit program for the discharge of dredge or fill material into waters of the United States. This permit program is administered by the USACE.

Pursuant to Section 404 of the CWA, the United States Army Corps of Engineers (USACE) regulates discharges of dredged or fill material into waters of the United States. These waters include wetlands and non-wetland bodies of water that meet specific criteria, including a direct or indirect connection to interstate commerce. The USACE regulatory jurisdiction pursuant to Section 404 of the CWA is founded on a connection, or nexus, between the waterbody in question and interstate commerce. This connection may be direct (through a tributary system linking a stream channel with traditional navigable waters used in interstate or foreign commerce) or may be indirect (through a nexus identified in the USACE regulations). The USACE typically regulates as non-wetland waters of the United States any body of water displaying an ordinary high water mark. To be considered a jurisdictional wetland under Section 404, an area must possess three wetland characteristics: hydrophytic vegetation, hydric soils, and wetland hydrology. Each characteristic has a specific set of mandatory wetland criteria that must be satisfied in order for that particular wetland characteristic to be met. A project-specific discussion regarding Section 404 issues is provided in Section 4.4, Biological Resources, in this Draft EIR.

Safe Drinking Water Act. The Safe Drinking Water Act (SDWA) (42 USC Section 300f et seq.) is intended to protect public health by regulating the nation’s public drinking water supply. The federal SDWA authorizes the EPA to set national standards for drinking water to protect against both

Page 353 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -210 naturally occurring and man-made contaminants. The EPA was required to establish primary regulations for the control of contaminants that affected public health and secondary regulations for compounds that affect the taste, odor, and aesthetics of drinking water. Under the provisions of the SDWA, the California Department of Health Services (DHS) has primary enforcement responsibility.

Title 22 of the California Administrative Code establishes DHS authority and stipulates State drinking water quality and monitoring standards.

Energy Policy Act of 1992. The Federal Energy Regulatory Commission (FERC) regulates the transmission and sale of electricity in interstate commerce (including interstate gas pipelines that serve California), licensing of hydroelectric projects, and oversight of related environmental matters.

As part of the license application process, environmental analysis pursuant to the National Environment Policy Act must be conducted. FERC acts under the legal authority of the Federal Power Act of 1935, the Public Utility Regulatory Policies, and the Energy Act of 1992, in addition to several other federal acts. The Energy Act of 1992 addresses energy efficiency, energy conservation and energy management, natural gas imports and exports, and alternative fuels (including as used in motor vehicles). It amended parts of the Federal Power Act of 1935.

4.19.2.2 State Regulations
California Integrated Waste Management Act of 1989. The California Integrated Waste Management Act of 1989 (Public Resources Code [PRC] Division 30), enacted through Assembly Bill (AB) 939 and modified by subsequent legislation, required all California cities and counties to implement programs to reduce, recycle, and compost at least 50 percent of wastes by 2000 (PRC §41780). The State determines compliance with this mandate to “divert” 50 percent of generated waste (which includes both disposed and diverted waste) through a complex formula. This formula requires cities and counties to conduct empirical studies to establish a “base year” waste generation rate against which future diversion is measured. The actual determination of the diversion rate in subsequent years is arrived at through deduction, not direct measurement: instead of counting the amount of material recycled and composted, the city or county tracks the amount of material disposed at landfills, then subtracts the disposed amount from the base year amount. The difference is assumed to be diverted (PRC §41780.2).

Solid Waste Reuse and Recycling Access Act. The Solid Waste Reuse and Recycling Access Act requires areas in development projects to be set aside for collecting and loading recyclable materials. The act required California Department of Resources Recycling and Recovery (CalRecycle) to develop a model ordinance for adoption by any local agency relating to adequate areas for collection and loading of recyclable materials as part of development projects. Local agencies are required to adopt a model or an ordinance of their own to govern adequate areas in development projects for collection and loading of recyclable materials.

California Green Building Standards Code. The California Green Building Standards Code (CALGreen Code) became effective for all projects beginning after January 1, 2011. Section 4.408, Construction Waste Reduction Disposal and Recycling, of the CALGreen Code mandates that in the absence of a more stringent local ordinance, a minimum of 50 percent of non-hazardous construction and demolition debris must be recycled or salvaged.

Page 354 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-211 California Code of Regulations Titles 14 and 27. These parts of the California Code of Regulations require energy-efficient practices as part of solid and hazardous waste handling and disposal.

Senate Bill 901: Water Supply and Demand Reliability Assessment (California Water Code Section 10910). Senate Bill (SB) 901, which was signed into law on October 16, 1995, requires every urban water supplier to identify as part of its Urban Water Management Plan (UWMP) the existing and planned sources of water available to the supplier over a prescribed 5-year period. SB 901 requires additional information to be included as part of an urban water management plan if groundwater is identified as a source of water available to the supplier. Provisions of SB 901 would require an urban water supplier to include in the plan a description of all water supply projects and programs that may be undertaken to meet total project water use. As part of this assessment, the public water system is required to indicate whether its total projected water supplies available during normal, single-dry, and multiple-dry water years will meet the project demand associated with the Project, in addition to the public water system’s existing and planned uses.

Senate Bill 1016. As previously identified, the California Integrated Waste Management Act of 1989 (Assembly Bill [AB] 939) requires each jurisdiction to divert 50 percent of its solid waste from being disposed of in landfills. The new per capita disposal measurement system (Senate Bill [SB] 1016, Wiggins, Chapter 343, Statutes of 2008) became effective January 1, 2009. It builds on AB 939 compliance requirements by implementing a simplified measure of local jurisdictions’ performance.

SB 1016 accomplishes this by changing to a disposal-based indicator: the per capita disposal rate, which uses only two factors: a jurisdiction’s population and its disposal as reported by disposal facilities. SB 1016 changes how each jurisdiction’s progress is measured to reach the 50 percent goal for diverting waste from landfills. This measurement is no longer determinative of compliance. For the California Integrated Waste Management Board (CIWMB) and jurisdictions to more properly focus on successful program implementation, SB 1016 shifts from the historical emphasis on using calculated generation and estimated diversion to using annual disposal as a factor when evaluating jurisdictions’ program implementation.

Senate Bill 1374. SB 1374 requires that the annual report submitted to CalRecycle include a summary of the progress made in diversion of construction and demolition waste materials. In addition, SB 1374 required that CalRecycle adopt a model ordinance suitable for adoption by any local agency to require 50 to 75 percent diversion of construction and demolition waste materials from landfills by March 1, 2004. Local jurisdictions are not required to adopt their own construction and demolition ordinances, nor are they required to adopt CalRecycle’s model by default. However, adoption of such an ordinance may be considered by CalRecycle when determining whether to impose a fine on a jurisdiction that has failed to implement its Source Reduction and Recycling Element.

Assembly Bill 1327, California Solid Waste Reuse and Recycling Access Act of 1991. Signed into law in 1991, AB 1327 added Chapter 18 to Part 3 of Division 30 of the PRC. Chapter 18 required the California Integrated Waste Management Board (CIWMB) to develop a model ordinance for adoption of recyclable materials in development projects. Local agencies were then required to adopt the model, or ordinances of their own, in order to govern adequate areas for collection and loading of recyclable materials in development projects by September 1, 1993. If a local agency had

Page 355 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -212 not adopted a model ordinance by that date, the CIWMB model would be adopted and enforced by the local agency.

Assembly Bill 75. AB 75, passed in 1999, took effect on January 1, 2000. This bill adds new provisions to the PRC, mandating that State agencies develop and implement an Integrated Waste Management Plan (IWMP); it also mandates that community service districts providing solid-waste services report disposal and diversion information to the city, county, or regional agency in which the community service district is located.

Assembly Bill 341. AB 341, enacted in 2011 and begun in 2012, changes the due date of the State agency waste management annual report to May. The bill makes a legislative declaration that it is the policy goal of the State of California that not less than 75 percent of solid waste generated be source reduced, recycled, or composted by 2020.

Urban Water Management Planning Act. The Urban Water Management Planning Act (UWMP Act) (California Water Code [CWC], Division 6, Part 2.6, §10610 et seq.) was enacted in 1983. The UWMP Act applies to municipal water suppliers that provide water service directly to more than 3,000 connections. The UWMP Act requires these suppliers to update their UWMP every 5 years to demonstrate an appropriate level of reliability in supplying anticipated short-term and long-term water demands during normal, dry, and multiple dry years.

California Water Conservation in Landscaping Act, Government Code §65591 et seq. Pursuant to the Water Conservation in Landscaping Act of 2006 (Government Code 65591 et seq.), cities and counties in California are required to adopt a water efficient landscape ordinance. Local ordinances are intended to reduce water use for landscaping and irrigation purposes and encourage the use of recycled and reclaimed water for these purposes. The California Department of Water Resources maintains a Model Water Efficient Landscape Ordinance (California Code of Regulations 490 23 et seq.) after which local jurisdictions can model their ordinances.

California Water Recycling in Landscaping Act, Government Code §65601 et seq. The California Water Recycling in Landscaping Act promotes the efficient use of water through the development of water recycling facilities. This act stipulates that landscape design, installation, and maintenance should be water efficient, and the use of potable domestic water for landscaped areas is considered a waste or unreasonable use of water if recycled water is available that meets the conditions described in Section 13550 of the CWC.

Title 24 of the California Code of Regulations. Energy and water consumption by new buildings in California is regulated by the CALGreen Code, embodied in California Code of Regulations Title 24.

Title 24 provides efficiency standards for new construction and the rehabilitation of both residential and nonresidential buildings, including building energy consumption, water conservation, and operational efficiencies. Title 24 regulates building energy consumption for heating, cooling, ventilation, water heating, and lighting with regard to both electricity and natural gas, while also regulating water consumption through the installation of efficient plumbing fixtures. The efficiency standards apply to both new construction and rehabilitation of both residential and nonresidential buildings. The building efficiency standards are enforced through the local building permit process.

Local government agencies may adopt and enforce energy standards for new buildings, provided

Page 356 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-213 these standards meet or exceed Title 24 Building Code requirements. The 2022 Standards went into effect January 1, 2023, following approval by the California Building Standards Commission.

4.19.2.3 Regional/Local
City of Fairfield General Plan. 85
• Goal PFS-1. Provide excellent public services and utilities that address current needs and are commensurate with future growth.
• Goal PFS-7. Provide an adequate supply of quality water and water infrastructure to support current and future population and employment growth, as well as focused support of the region’s agritourism goals.
○ Policy PFS-7.3. Infrastructure Maintenance and Improvement. Maintain water storage, conveyance, and treatment infrastructure in good working condition in order to supply domestic water to all users with adequate level of service. ○ Policy PFS-7.8 North Bay Regional Water Treatment Plant Expansion. Continue to work with the City of Vacaville as part of North Bay Regional Water Treatment Plant expansion efforts.
• Goal PFS-8. Ensure provision of superior wastewater collection and treatment facilities to support current and future growth.
○ Policy PFS-8.1. Sewer Services. Continue to provide sewer services and operate major public facilities through the Fairfield-Suisun Sewer District. ○ Policy PFS-8.2. Sewer System Maintenance. Support the Fairfield-Suisun Sewer District’s efforts to continue to provide sewer system maintenance for all main lines, pump stations and treatment plant facilities. The City of Fairfield will provide maintenance for all sewer main lines less than 12” in diameter.
○ Policy PFS-8.3. Wastewater Treatment. In cooperation with the Fairfield-Suisun Sewer District, plan, construct, and maintain wastewater treatment facilities to provide a level of wastewater treatment and service standards consistent with current and anticipated needs. ○ Policy PFS-8.4. New Development. Require that all new development located within City limits connect to the public wastewater collection system, construct all sanitary sewer lines serving such development (including oversizing of sewers if requested by the Fairfield-Suisun Sewer District or the City, and provide adequate funding for the development’s use 85 City of Fairfield. 2024c. Draft Environmental Impact Report for the Fairfield General Plan 2050 and Climate Action Plan. Page 3.1-7. July 26. Website: https://www.fairfield.ca.gov/home/showpublisheddocument/ 12145/638718493339670000 (accessed February 11, 2026).

Page 357 of 1497 ends

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026
4 \\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) -214 of all wastewater infrastructure and facilities. The costs of oversizing shall be borne by the beneficiary of the oversizing,
• Goal PFS-9. Develop and maintain an environmentally sensitive, climate resilient drainage system for handling runoff and preventing localized flooding. ○ Policy PFS-9.3. Storm Drainage Plan. Prior to project approval, require new development and redevelopment projects to submit a storm drainage plan that meets the following requirements:
■ Adherence to the City of Fairfield Standard Specifications and Details, Engineering Design Standards (Section 4 - Storm Drainage);
■ Prevention of on and off-site flooding through “green infrastructure,” Low Impact Development techniques and, if applicable, trash capture devices; and ■ Demonstration of stormwater runoff volumes that are no greater than the capacity of any portion of the existing downstream system through utilization of detention, retention, or other approved methods of stormwater management. ○ Policy PFS-9.4. Floodplain Management. Utilize a variety of means for floodplain management, including structural improvements, land use and zoning controls, erosion control techniques, setbacks, levees, floodways, detention and retention of storm runoff, green infrastructure improvements, and other measures as circumstances dictate. • Goal PFS-10. Maintain adequate solid waste disposal capacity.

City of Vacaville General Plan.
• Goal PUB-11. Provide adequate water infrastructure facilities to meet current and future populations.
○ Policy PUB-P11.1. Maintain water storage, conveyance, and treatment infrastructure in good working condition in order to supply domestic water to all users with adequate level of service. Prioritize improvement of the distribution network in underserved areas of the city.

4.19.3 Impact Analysis
The upgrades to the existing NBRWTP along with two practicable transmission pipeline alignments are being considered to convey treated water from the expanded facility to the City of Vacaville distribution system. These alignments include the Linear Trail pipeline alignment and the Peabody Road pipeline alignment. Each alignment would traverse a range of conditions, including developed and unpaved areas of the water treatment NBRWTP, across and along Putah South Canal, paved roadways, and unpaved open space areas that are generally not accessible to the public. For resource areas where environmental conditions vary between the alignments and could result in different impact outcomes, the analysis distinguishes between the Trail Alignment and the Peabody Road Alignment, as appropriate.

Page 358 of 1497 ends

INITIAL S TUDY /MITIGATED NEGATIVE DECLARATION
OCTOBER 2026

NORTH B AY REGIONAL WATER T REATMENT PLANT ,

F AIRFIELD -V ACAVILLE WATERWORKS P ROJECT

F AIRFIELD , C ALIFORNIA
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) 4-215 a. Would the project require or result in the relocation or construction of new or expanded water, wastewater treatment or stormwater drainage, electric power, natural gas, or telecommunications facilities, the construction or relocation of which could cause significant environmental effects?
Less Than Significant Impact. The expanded treatment capacity is intended to meet projected water demands identified in the planning documents of the cities of Fairfield and Vacaville, address a minor treatment capacity shortfall identified in the City’s 2024 Public Utilities Master Plan, and provide operational resiliency and redundancy to maintain reliable service during periods of high demand, maintenance activities, or unexpected service disruptions. The Project is consistent with the applicable General Plans, water system planning documents, and adopted growth forecasts of the cities of Fairfield and Vacaville. Although the Project would increase treatment capacity up to 65 mgd, the additional capacity is intended to accommodate the combined existing and planned water demands of both cities within their established service areas and urban growth boundaries, while also providing operational flexibility, redundancy, and long-term system resiliency. Accordingly, the Project would support planned growth previously contemplated in adopted planning documents and would not facilitate development beyond that anticipated in the respective General Plans.

Implementation of the Project would require construction of new water utility infrastructure, including treatment plant improvements, transmission pipeline facilities, electrical connections, and associated appurtenances. The NBRWTP improvements would be within an existing developed utility facility. The Peabody Road Pipeline Alignment would be primarily within or adjacent to existing roadway rights-of-way, utility corridors, and other previously disturbed areas. The Linear Trail Pipeline Alignment would generally follow an existing transmission main corridor adjacent to the Putah South Canal and former railroad corridor and would traverse a combination of utility corridors, open space areas, drainage features, and previously disturbed lands. Although portions of the Linear Trail Pipeline Alignment would be outside roadway rights-of-way, the alignment would generally follow existing utility and infrastructure corridors and would not establish a new utility service area or major utility corridor in an otherwise undeveloped region.

Construction of the water transmission pipeline and associated utility connections would result in temporary ground disturbance, trenching, equipment staging, and construction-related environmental effects. Potential impacts associated with biological resources, cultural resources, tribal cultural resources, hydrology and water quality, transportation, noise, air quality, and other environmental topics resulting from utility construction are evaluated in the applicable sections of this Initial Study. As discussed therein, implementation of applicable mitigation measures and compliance with existing regulations would reduce potentially significant impacts to a less than significant level.

No new wastewater treatment facilities or expansions of wastewater treatment capacity would be required as a result of the Project. The NBRWTP generates limited domestic and process water that would continue to be managed through existing facilities. Similarly, the Project would not require expansion of regional stormwater drainage infrastructure. Runoff generated by the NBRWTP improvements would continue to be managed through existing and modified on-site drainage facilities designed in accordance with applicable stormwater regulations and engineering standards.

Page 359 of 1497 ends