C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» vii PRC Public Resources Code
project North Bay Regional Water Treatment Plant, Fairfield-Vacaville Water Works Project
RPA Registered Professional Archaeologist
SHPO State Historic Preservation Officer
SLF Sacred Lands File
SNRW Sacramento Northern Railway
SOI Secretary of the Interior
USC United States Code
WEAP Worker Environmental Awareness Program
YDWN Yocha Dehe Wintun Nation
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 1-1
1.0 INTRODUCTION
The City of Fairfield (City) requires a cultural resource inventory of approximately 124.4 acres of land for the North Bay Regional Water Treatment Plant, Fairfield-Vacaville Water Works Project in Solano County, California (Figure 1). The project is a joint effort between the City of Fairfield and the City of Vacaville and proposes the upgrade and expansion of the existing treatment facility and construction of a new pipeline to serve Vacaville. The project intends to expand the capacity of the existing treatment plant to 65 million gallons per day to support buildout of both general plans. The improvements are designed to enhance water treatment reliability, accommodate projected population and service demand, and modernize aging infrastructure to ensure continued regulatory compliance. The upgrade and expansion within the North Bay Regional Water Treatment Plant (NBRWTP) would introduce new treatment facilities, expand the capacity of existing processes, and relocate or modify certain features to improve site function, circulation, and access.
The proposed pipeline has two potential alignments that would traverse developed and unpaved areas of the NBRWTP (Figure 2). One alternative would parallel the Putah South Canal along the east side of the canal, and cross both Putah South Canal and Union Creek before meeting Peabody Road (Linear Trail Alignment). The second alternate alignment would leave the NBRWTP to the west to Peabody Road paralleling the roadway to the north until it met the original alignment to Foxboro Parkway.
The City is the lead agency, and West Yost Associates, Inc. has contracted LSA to conduct an archaeological inventory of the project area, including a record search and a Class III intensive pedestrian survey pursuant to the California Environmental Quality Act (CEQA), Section 15064.5, and other applicable State and federal laws and regulations. The goals of the proposed cultural resources inventory are to identify and record all cultural resources in the project area and, if resources are located, evaluate them for inclusion in the National Register of Historic Places (NRHP) and California Register of Historic Resources (CRHR) and evaluate and mitigate the potential effects to cultural resources included in or eligible for inclusion in the CRHR or NRHP. The potential to affect cultural resources included in or eligible for inclusion in the CRHR or NRHP must be considered prior to the commencement of any project-related activities. This study was led by LSA Archaeologist Brieann DeOrnellas, M.A., RPA, serving as Principal Investigator and Field Director. Fieldwork was supported by LSA Field Archaeologist Anthony Davolio, B.A. and Bruce Flores.
This report includes detailed environmental, precontact, ethnographic, and historic background context; a discussion of the archival research, record searches, and literature reviews; a summary of the survey methods and results; and a conclusion with recommendations for mitigating effects to historic properties.
1.1 PROJECT AREA
The project area is within Fairfield and Vacaville approximately 53 miles northeast of San Francisco and 37 miles southwest of Sacramento, California. The project area consists of a water treatment plant with associated ponds and structures, a solar farm, a canal, and overgrown fields bisected by fence lines. It is depicted on the United States Geological Survey Elmira, California (1980), 7.5-
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 1-2 minute topographic quadrangle in Township 05 and 06 North, Range 01 West, and Sections 03, 04, 10, and 34, Mount Diablo Baseline and Meridian (Figure 1).
The project area is regionally on the western side of California’s Central Valley in Solano County, primarily generally south of Vacaville, north of Travis Air Force Base. Just east of the project area is Jepson Prairie. It is predominantly in northeastern Fairfield within the NBRWTP property, but also extends to include two potential pipeline alignments extend north into Vacaville. Generally, the project area is between Peabody Road to the west and Vanden Road to the east. Additionally, the area contains nonnative annual grassland, seasonal wetlands, three seasonal ponds, and a crossing over a concreted portion of Union Creek (Figure 2).
1.2 REGULATORY FRAMEWORK
State historic preservation regulations affecting this project include the statutes and guidelines contained in CEQA, Public Resources Code (PRC) Sections 21083.2 and 21084.1, and Sections 15064.5 and 15126.4 (b) of the State CEQA Guidelines. State CEQA Guidelines Section 15064.5 requires that lead agencies determine whether projects may have a significant effect on archaeological and historical resources. This determination applies to those resources that meet significance criteria qualifying them as “unique,” “important,” listed on the CRHR, or eligible for listing on the CRHR. PRC Section 21098.1 further cites, “A project that may cause a substantial adverse change in the significance of a historical resource is a project that may have a significant effect on the environment.” A “historical resource” includes, but is not limited to, any object, building, structure, site, area, place, record, or manuscript that is historically or archaeologically significant (PRC Section 5020.1).
Advice on procedures to identify such resources, evaluate their importance, and estimate potential effects is given in several agency publications (e.g., the Governor’s Office of Planning and Research [OPR] CEQA and Archaeological Resources series). The technical advice series produced by OPR strongly recommends that Native American concerns and the concerns of other interested persons and corporate entities, including, but not limited to, museums, historical commissions, associations, and societies be solicited as part of the process of cultural resources inventory. In addition, California law protects Native American burials, skeletal remains, and associated grave goods regardless of the antiquity and provides for the sensitive treatment and disposition of those remains (California Health and Safety Code Section 7050.5, PRC Section 5097.94).
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 1-12
If the agency determines that a project may have a significant effect on a significant resource, the project is determined to have a significant effect on the environment, and these effects must be addressed. If a cultural resource is found not to be significant or unique under the qualifying criteria, it need not be considered further in the planning process. CEQA emphasizes avoidance of archaeological and historical resources as the preferred means of reducing potential significant environmental effects resulting from projects. If avoidance is not feasible, an excavation program or some other form of mitigation must be developed to mitigate the impacts. To adequately address the level of potential impacts and thereby design appropriate mitigation measures, the significance and nature of the cultural resources must be determined. The following are steps typically taken to assess and mitigate potential impacts to cultural resources for the purposes of CEQA:
• Identify cultural resources
• Evaluate the significance of the cultural resources found • Evaluate the effects of the project on cultural resources • Develop and implement measures to mitigate the effects of the project on cultural resources that would be significantly affected
The objective of the cultural resources inventory for this project is to identify cultural resources through a systematic Phase I archaeological survey of the project area and to make recommendations if any observed sites are eligible for inclusion in the CRHR or NRHP. The State CEQA Guidelines include procedures for identifying, analyzing, and disclosing potential adverse impacts to historical resources, which include all resources listed in or formally determined eligible for listing in the NRHP, the CRHR, or local registers. Historical resources are defined as “a resource listed or eligible for listing on the California Register of Historical Resources” (PRC, Section 5024.1; 14 CCR 15064.5). Under State CEQA Guidelines Section 15064.5(a), the term “historical resources” includes:
1. A resource listed in or determined to be eligible by the State Historical Resources Commission, for listing in the CRHR (PRC, Section 5024.1).
2. A resource included in a local register of historical resources, as defined in Section 5020.1(k) of the PRC or identified as significant in a historical resource survey meeting the requirements of Section 5024.1(g) of the PRC, will be presumed to be historically or culturally significant. Public agencies must treat any such resource as significant unless the preponderance of evidence demonstrates that it is not historically or culturally significant.
3. Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be a historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the CRHR (PRC Section 5024.1), including the following:
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 1-13
• Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural history (Criterion A); • Is associated with the lives of persons important in California’s past (Criterion B); • Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values (Criterion C); or
• Has yielded, or may be likely to yield, information important in prehistory or history (Criterion D).
4. The fact that a resource is not listed in, or determined to be eligible for listing in the California Register of Historical Resources, not included in a local register of historical resources (pursuant to Section 5020.1(k) of the PRC), or identified in a historical resources survey (meeting the criteria in Section 5024.1(g) of the PRC) does not preclude a lead agency from determining that the resource may be an historical resource as defined in PRC Sections 5020.1(j) or 5024.1.
Additional guidelines for compliance and implementation of environmental laws, regulations, and methods that apply to managing cultural resources on this Project can be found outlined in the Office of Historic Preservation (OHP) Instructions for Recording Historical Resources (1995), the American Indian Religious Freedom Act (42 United States Code [USC] Sections 1996 and 1996a); Executive Order 13007, Indian Sacred Sites; Executive Order 13175, Consultation and Coordination With Indian Tribal Governments; the Native American Graves Protection and Repatriation Act (25 USC Section 3001 et seq.); and the Archaeological Resources Protection Act (16 USC Sections 470aa–470mm).
Given that the Putah South Canal intersects the project area and that the project intends to design improvements that will enhance water treatment reliability, accommodate projected population and service demand, and modernize aging infrastructure to ensure continued regulatory compliance, it is possible that federal funding may be used and the United States Bureau of Reclamation would serve as the lead agency per the National Environmental Policy Act. However, with the current absence of a federal nexus, for the purposes of this report, LSA has assessed the project area pursuant to CEQA guidelines.
1.2.1 Assembly Bill 52
California Assembly Bill (AB) 52 of 2014 was enacted on July 1, 2015, and expands CEQA by defining a new resource category, “Tribal Cultural Resources.” AB 52 establishes a formal consultation process for California tribes as part of CEQA and equates significant impacts on tribal cultural resources with significant environmental impacts. AB 52 defines a “California Native American Tribe” as a Native American tribe in California that is on the contact list maintained by the Native American Heritage Commission (NAHC).
AB 52 requires formal consultation with California Native American tribes prior to determining the level of environmental document if a tribe has requested to be informed by the lead agency of
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 1-14
proposed projects. AB 52 also requires that consultation address project mitigation measures for significant effects, if requested by the California Native American tribe, and that consultation be concluded when either the parties agree to measures to mitigate or avoid a significant effect, or the agency concludes that mutual agreement cannot be reached. Under AB 52, such measures shall be recommended for inclusion in the environmental document and adopted mitigation monitoring program if determined to avoid or lessen a significant impact on a tribal cultural resource.
AB 52 establishes that “A project with an effect that may cause a substantial adverse change in the significance of a tribal cultural resource is a project that may have a significant effect on the environment” (PRC Section 21084.2). It further states that the lead agency shall establish measures to avoid impacts that would alter the significant characteristics of a tribal cultural resource, when feasible (PRC Section 21084.3). PRC Section 21074 (a)(1)(A) and (B) define tribal cultural resources as:
1. “Sites, features, places, cultural landscapes, sacred places, and objects with cultural value to a California Native American tribe” and are either listed or eligible for listing in the CRHR, or in a local register of historical resources as defined in PRC Section 5020.1(k); or
2. A cultural resource determined by the lead agency, in its discretion and supported by substantial evidence, to be significant pursuant to criteria set forth in subdivision (c) of PRC Section 5024.1.
In applying the criteria set forth in subdivision (c) of PRC Section 5024.1, the lead agency shall consider the significance of the resource to a California Native American tribe.
AB 52 also establishes a formal consultation process for California tribes regarding those resources.
The consultation process must be completed before a CEQA document can be certified. AB 52 requires that lead agencies “begin consultation with a California Native American tribe that is traditionally and culturally affiliated with the geographic area of the proposed project.” Native American tribes to be included in the process are those that have requested notice of projects proposed within the jurisdiction of the lead agency.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 2-1
2.0 NATURAL CONTEXT
The proposed project is in Solano County, California, and is midway between San Francisco and Sacramento along the Interstate 80 corridor. Bordered by the California Coastal Ranges on the western side, it bridges the Bay Area and the Central Valley, and serves as the gateway to both the California Sacramento-San Joaquin River Delta and the Napa Valley.
The primary landform encompassing the project area is defined by the scenic Suisun and Green valleys, and is also directly north of Suisun Bay. This places the project area immediately adjacent to the Suisun Marsh, which is the largest contiguous brackish marsh in California and provides a massive habitat for migratory birds and diverse wildlife. The geologic setting is primarily ancient alluvium with some outcrops of the Tehama Formation to the southwest and sedimentary rock to the north. The terrain consists of rolling hills separated by flat depressions with vernal pools that forming during rainy seasons and seasonally transforming some lower natural flatlands into wetlands. As the pools slowly dry in concentrical patterns, distinctive sequences of vegetation are produced. Vegetation primarily includes willows, cottonwoods, oak, reeds, tules, sedges, grasses, and forbs.
This region of California has a Mediterranean climate, with warm, dry summers and mild, wet winters. The warm season lasts from June 4 to October 8, with an average daily high temperature above 80 degrees Fahrenheit (°F). The hottest month of the year is July, with an average high of 86°F and low of 58°F. The cool season lasts from November 27 to February 14, with an average daily high temperature below 61°F. The coldest month of the year in Fairfield is January, with an average low of 41°F and high of 56°F (Weatherspark 2025).
2.1 SOILS
The soils within the project area are primarily composed of the San Ysidro series (85 percent), which is composed of very deep, moderately well-drained soils that formed in alluvium from sedimentary rocks. Other soils within the project area include the Capay, Diablo, Brentwood, Rincon, and Pescadero series. Capay series consists of very deep, moderately well and somewhat poorly drained soils that formed in fine textured alluvium derived from mostly sandstone and shale. Capay soils are on flood basins, alluvial fans, interfan basins and basin rims. The Capay series has a disturbed Ap Horizon with a depth of 0 to 13 centimeters below the surface (cmbs) (0-5 inches) (KSSL 2025).
2.1.1 San Ysidro
The San Ysidro series in this region has an Ap Horizon depth of 0 to 18 cmbs (0 – 7 inches) that has been disturbed by plowing activities. The subsequent A Horizon has a depth of 18 to 36 cmbs (7 – 36 inches) (KSSL 2025). The San Ysidro soils are characteristically very mature soils of Pleistocene epoch, that formed on ancient coastal terraces or elevated mesas (Knudsen et. al. 2000).
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 2-2
2.1.2 Diablo
The Diablo series is a member of the fine, smectitic, thermic family of Aridic Haploxererts. The Diablo series has an Ap Horizon from 0 to 15 cmbs (0 – 6 inches) and an A Horizon from 15 to 38 cmbs (6 – 15 inches) (KSSL 2025).
2.1.3 Brentwood
Brentwood series are fine, smectitic, thermic Typic Haploxerepts with an Ap Horizon depth from 0 to 20 cmbs (0 – 8 inches) and an A Horizon from 20 to 46 cmbs (8 – 18 inches) (KSSL 2025). The Brentwood soil series formed in Holocene-epoch alluvium in Solano County (Knudsen et. Al 2000).
2.1.4 Rincon
The Rincon series consists of deep, well drained soils that formed in alluvium from sedimentary rocks. Rincon soils are on old alluvial fans and both stream and marine terraces, and have slopes of O to 30 percent. They are fine, smectitic, thermic Mollic Haploxeralfs with an Ap Horizon from 0 to 10 cbms (0 – 4 inches) and an A12 Horizon from 10 to 41 cmbs (4 – 16 inches) (KSSL 2025). While the soil itself is a mapped series, the underlying geological formations—specifically in areas like American Canyon and valley floors near Vacaville—are frequently categorized as Early to Late Holocene fan and fluvial deposits (Knudsen et. Al 2000).
2.1.5 Pescadero
The Pescadero series consists of very deep, poorly drained soils that formed in alluvium from sedimentary rocks and are present in basins. They are fine, smectitic, thermic Aquic Natrixeralfs with an An Horizon from 0 to 8 cm (0 – 3 inches) (KSSL 2025). In the region of the project area, the Pescadero series typically overlie Late to Latest Holocene basin deposits.
2.1.6 Soil Sensitivity
Buried prehistoric resources are commonly in or beneath Holocene-age soil deposits (Meyer and Rosenthal 2007), making them geologically young and highly susceptible to containing buried cultural materials. The San Ysidro, Capa, and Diablo series tend to be very mature soils of Pleistocene epoch, that formed on ancient coastal terraces or elevated mesas and are unlikely to contain buried cultural resources. (Knudsen et. Al 2000). However, the Brentwood, Rincon, and Pescadero series tend to be formed, or bury, Holocene-aged soils. Furthermore, the Brentwood and Rincon series have A Horizons with depths below 40 cmbs (15.7 inches). The combination of these factors indicates that the locations of the project area that contain these soil series have a moderate-to-high sensitivity for subsurface cultural deposits.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-1
3.0 CULTURAL OVERVIEW
The section below contains background information relevant to the region in which the project area is located. The precontact and ethnographic context provides a chronological cultural framework for the incremental evolution of material culture, lifeways, and traditions. The historical context discusses examples of extreme changes imposed upon Native peoples at the time of nonnative contact, as well as the subsequent colonial settlement configurations and industries that proliferated in the region.
3.1 PRECONTACT CONTEX
This section is divided into four broad geological/chronological periods (Terminal Pleistocene, Early Holocene, Middle Holocene, and Late Holocene), and three cultural periods (Early Archaic, Middle Archaic, and Late Archaic). The area in which the project area is located consists of two geologic regions of California (the San Francisco Bay/Sacramento-San Joaquin River Delta (Delta) Area and the Sacramento Valley) and overlapping chronological sequences in both of these geologic regions.
3.1.1 Terminal Pleistocene (13,500–11,700 cal BP)
The Terminal Pleistocene is temporally associated with material culture, including Clovis and Western Stemmed Tradition projectile points, although this occupation marked by these temporal artifacts is rarely encountered in California; therefore, limited data have constrained scientific understanding of these occupation periods. The most common form of material culture representative of these occupational periods are isolated fluted points (Byrd et al. 2017). However, there has not yet been documentation of fluted points or cultural deposits dating to the Terminal Pleistocene in the San Francisco Bay-Delta Area. The absence of cultural deposits from the Terminal Pleistocene in the region is likely due to smaller populations that were highly mobile and relocated rapidly across the continent. Consequently, the archeological signature marked by cultural deposits from this period tend to be few and sparsely concentrated (Byrd et al. 2017). Additionally, there were widespread natural transformations of the North Bay Area during the Holocene due to post-Ice Age sea level rise and associated climate shifts, as well as later historic development of the entire Bay Area, which likely concealed or destroyed much of the material evidence of the earliest human habitation in the region
3.1.2 Early Holocene (11,700–8,200 cal BP)
Archaeological evidence of the Early Holocene suggests patterns of human occupation in Central and West Coast California were highly mobile hunter-gatherer communities who procured exceptionally variant flora and fauna for subsistence, including marine, terrestrial, and lacustrine (Byrd et al. 2017).
The majority of archaeological assemblages from this period are composed of many lithic tools characteristically similar to coetaneous materials observed in the Great Basin and southern North Coast Ranges. Groundstone tools used to crush grains (e.g., millingslabs and handstones) are particularly common in Early Holocene cultural deposits, which is a distinct regional trait in California and differs from contemporaneous Great Basin cultural deposits. Additional assemblages from Early Holocene archaeological deposits include varied flaked stone tools, including large, prepared cores and cobbles, flaked-stone crescents, and well-formed bifaces. Obsidian sourcing studies have shown
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-2 that most obsidian utilized as toolstone in the region was procured from the southern North Coast Ranges, primarily in the Napa Valley, but was less frequently foraged from the Bodie Hills in the Eastern Sierras. Zooarchaeological studies have identified assortments of diverse terrestrial fauna from Early Holocene sites, including grizzly bear (Ursus arctos horribilis), deer (Cervidae spp.), coyote (Canis latrans), elk (Cervus canadensis), rabbit (Oryctolagus cuniculus), and ground squirrels (Otospermophilus beecheyi)
3.1.3 Middle Holocene (8,200–4,200 cal BP)
The Middle Holocene is more extensively represented in archaeological deposits than the preceding time periods. The Middle Holocene consists of both surface and subsurface phenomena and large habitation sites, with artifact assemblages that increased in diversity. Such artifacts include flaked stone points (e.g., side-notched darts); groundstone tools (including millingstones, mortars, pestles, and handstones); shell beads and ornaments; and cobble-based tools likely used for scraping, pounding, and chopping. Like the Early Holocene, obsidian used for making stone tools during this period was procured from the Napa Valley as well as the Bodie Hills and Casa Diablo regions of the Eastern Sierra Nevada. The increased presence of non-local toolstone was also observed in many cultural deposits during this period, indicating a system of multiregional obsidian exchange that continued throughout the Late Holocene. The mortar and pestle were the most prevalent milling implements observed in the North San Francisco Bay Area region during the Middle Holocene. This time period also brought about a substantial increase in use of estuarine subsistence procurement, as evidenced by sites dating to this time. Estuarine dietary staples included Bay mussel (Mytilus sp.), oyster (Ostrea sp.), freshwater shellfish, and seasonal waterfowl, as well as estuarine, anadromous, and freshwater fish. Archaeobotanical remnants from Middle Holocene sites tend to be taxonomically diverse and indicative of semi-permanent or multi-seasonal habitation patterns.
3.1.4 Late Holocene (4,200–180 cal BP)
The Late Holocene is categorized into the five main time intervals: Early (4,200–2,550 calibrated years before present [cal BP]), Early/Middle Transition (2,550–2,150 cal BP), Middle (2,150–930 cal BP), Middle/Late Transition (930–685 cal BP), and Late (685–180 cal BP). The Middle and Late Periods can be further broken down into phases that are largely estimated upon the seriation of distinct shell bead typological trends during specific time periods (Groza et al. 2011). There is an abundance of archaeological data from Late Holocene cultural deposits in the San Francisco Bay-Delta Area that demonstrate an increase in population, as well as socio-political and economic complexity.
3.1.5 Early Archaic (4,200–2,550 cal BP)
There was a significant proliferation of large shell mound communities along the margins of the Bay during the Early Archaic period. Lithic and groundstone assemblages of shell mound sites included large stemmed and concave-base obsidian projectile points, pestles (which were often short and cylindrical), cylindrical and unshaped mortars, crescentic stones, polished ribs, bone awls, various abalone (Haliotis spp.) pendants and rectangular beads, rectangular and spire-lopped Olivella beads, perforated charm stones, notched and grooved net weights, antler wedges, and stone bars.
Archaeobotanical evidence suggests small seeds, berries, and nuts were prevalent staples in plant-based consumption. Habitation patterns shifted and became moderately sedentary by the Early
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-3 Archaic, as demonstrated by the appearance of housing structures, plant and animal remnants from multiple seasons, funerary practices, indicators of repeated exchange, and increased concentrations of mortars and pestles
3.1.6 Middle Archaic (2,150–930 cal BP)
The Early-to-Middle Transition began around 2,550 cal BP, which was marked by an increase in permanent settlement marked by archaeological evidence suggesting sedentary or multi-season habitation during that period (Byrd et al. 2017). In Marin County during this period semi-sedentary villages and mobile forager camps were seen in tandem (Milliken et al. 2007:106, 115; Moratto 1984:235, 278). The Middle Archaic is regarded as the peak of mound-building activities and is also associated with increased societal and ceremonial complexity. Significant shifts in artifact types also occurred during this period, with assemblages including single-barbed and barbless bone fishing spears; large, shaped mortars and pestles; ear spools; and various Haliotis and Olivella ornaments and beads. Mortuary practices became increasingly complex and ritualized, and analyses of food remains, as well as human bone stable isotope analysis, indicate an increased consumption of terrestrial resources, with deer and acorns also becoming more dietarily common.
3.1.7 Late Archaic (685–180 cal BP)
During the Middle-to-Late Transition, precontact populations of the San Francisco Bay Area flourished, and material culture from this time exhibits a growth in the size of permanent villages and an increase in ritual activities. Artifact assemblages at the end of the Middle/Late Transition include chevron-etched bone whistles, flanged steatite pipes, Haliotis shell pendants, clam (Macoma) shell disc beads, intricately finished stone “flower pot” mortars, and coiled basketry awls.
Near the onset of the Late Archaic, communities in the region advanced their projectile-based technology, particularly with the advent of the bow and arrow, with the Stockton Serrated projectile point being authentic to the region. Archaeobotanical remains from this period suggest small seeds were increasingly used as a dietary supplement to acorns and other nuts. Faunal data suggests many animal species were utilized for sustenance, including deer, rabbits, sea otters, clams (Macoma), and mud snails (Cerithidea). Patterning of funerary rituals became more prevalent during this period, as evidenced by the rise of intentionally broken or “killed” grave goods, flexed burials, inclusion of various additional offerings, and more.
3.2 ETHNOGRAPHIC CONTEXT
The location of the North Bay Regional Water Treatment Plant (NBRWTP) landholdings are within the traditional ethnographic territory of the Patwin (Figure 3).
3.2.1 Patwin
Around A.D. 1750, at the time of early Spanish colonization of Alta California, Penutian-speaking groups inhabited the area in which NBRWTP is currently located. The NBRWTP is also within the range of the Suisun and Talenas triblets of the Southern Patwin, or Wintuan (Bennyhoff 1977). Little is known about the Southern Patwin ethnographically, as the malaria and smallpox epidemics of 1833 and 1837, along with the impacts of the Gold Rush, likely contributed to the severe Indigenous
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-5 population loss in the Central Valley. This devastating loss led many remaining Native peoples of the region to flee by the time Alfred Kroeber arrived and initiated his ethnographic investigations from 1845-1855. Most ethnographic interpretations of the Southern Patwin come from foundational knowledge from the Northern Patwin and on similarities shared with their eastern counterparts, the Plains Miwok (Bennyhoff 1977).
The Patwin people shared a language but were composed of smaller independent political tribal entities, each of which inhabited discrete territories and governed access to natural resources within them. Each tribal territory had at least one permanent village and various smaller campsites that were used as needed for seasonal resource procurement. Extended families lived in domed, conical structures composed of earthen-covered limbs and branches or thatched grass. Men’s houses were constructed of the same materials but were semi-subterranean and located at larger village sites (Kroeber 1970). Ethnographic studies have shown that Patwin people had extensive ceremonial practices, likely correlated with having a plentiful and constant presence of subsistence resources (Bennyhoff 1977; Kroeber 1970; Levy 1978). Death rituals were extremely significant and included two known forms of interment and with mortuary goods placed into the grave with the decedent at the time of burial. Cremation was also practiced but was less common.
The native environment of the Patwin was rich in resources, and studies have indicated acorns, fish, seeds, grasses, nuts, berries, roots, and game mammals were common staples of the Patwin diet (Baumhoff 1963; Bennyhoff 1977). It has also been argued that plant food collection and preparation was the core of Patwin technology (Kroeber 1970).
3.2.2 Spanish Colonial Contact
The arrival of Spanish colonists in the San Francisco Bay Area in 1775 resulted in the sudden, widespread death of California Native populations, including the Patwin. Early expeditions and missionaries introduced diseases and violence that led to the demise of a substantial amount of the Native population (Heizer 1949). In the 1840s, after the Mission system was abandoned, there was a Mexican takeover that initiated the development of ranchos throughout California, and many surviving Natives were forced to work for the ranchos.
The prairielands in what is currently the Solano County area were originally vegetated with native flora and fauna, which was eventually converted to pastureland and native vegetation was largely overtaken by invasive European annual grasses and cultivated crops. Large herds of tule elk and pronghorn were once prevalent in the native grassland, but were replaced with deer and grazing animals, including domestic cattle, horses, and sheep.
Presently, some descendants of Patwin ancestors live throughout the Bay Area and the Sacramento Valley. Many Patwin descendants actively participate in preserving and reviving aspects of their traditional culture and ancestral lands.
3.2.2.1 Mission Dolores and Mission San Francisco Solano In 1776, Mission Dolores—also known as Mission San Francisco de Asís—and the San Francisco Presidio were established, but it was not until 1823 that Mission San Francisco Solano would be established in what is now Solano County. The creation of the mission system by Franciscan priests in
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-6 Alta California was part of a strategic effort to extend Spanish power to Alta California to halt the ongoing Russian advance down the Pacific coastline. The missions were supported with small military groups and were tasked with forcefully converting local Native Americans to Catholicism and exploiting their labor to establish agricultural plantations (Shoup and Milliken 1999). Per protocol, the Spanish viceroy in Mexico wanted to keep the costs of Alta California as low as possible, so the Franciscan order was given almost total control in the territory based upon the understanding that they would subsidize the costs of settlement and maintenance of the military detachments assigned to the area (Jackson and Castillo 1995:11).
3.3 HISTORICAL CONTEXT
This section summarizes historical events following arrival of nonnative peoples to the region, as well as property ownership pertaining to the project area over time. And the associated historic land changes and developments in the area.
3.3.1 Ranching History and Early Settlement
Farming and ranching on large ranchos were historically commonplace in the region and, after the discovery of gold in the Sierra Nevada foothills in 1848, the subsequent gold rush brought about an influx of immigrants, creating a demand for vegetables, fruit, and beef (ICRMP 2021). By 1868, the segment of the California Pacific Railroad between Vallejo and Suisun City was complete. When the Central Pacific Railroad purchased the California Pacific Railroad, farmers in Solano County were able to ship their produce east.
3.3.2 City of Fairfield
In 1839, the land containing what is presently known as Fairfield was petitioned by José Fancisco Armijo, and was granted to him by Governor Pío Pico in 1840 as Rancho Tolenas. Upon Armijo’s death in 1850, the land passed to his son, Antonio. Eight years later, Captain R. H. Waterman acquired the Rancho Tolenas land, and offered 16 acres to Solano County to gain a new, more centrally located county seat. Voters of Solano County accepted the offer, allowing the county seat to be relocated from Benicia (Hoover et al. 2002).
3.3.3 City of Vacaville
In 1850, landowner Don Manuel Vaca deeded 5,760 acres of Rancho Los Putos to William McDaniel for him to build a town and name it in the likeness of Vaca’s surname (Hoover et al. 2002), leading to the name Vacaville. In the late 1850s, the regional fruit industry was established when local nursery owners Ansel Putman and John Dolan and William and Simpson Thomas constructed a road from Pleasants Valley to Suisun City. This road alignment, later named Pleasants Valley Road, gave access for fragile fruit shipments from Vaca, Pleasant, and Laguna valleys to major markets (Hoover et al. 2002). This transportation corridor catalyzed land development for commercial fruit and vegetable farming in the region, and the construction of two major railways by 1870 expanded the market nationwide. By the 1890s, nearly all of the available non-irrigated land of Vaca Valley and its western foothills was enveloped in orchards (Gregory 1912).
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-7
3.3.4 Industrial Development
3.3.4.1 The Pacific Portland Cement Company
In 1875, limestone and basalt quarries were established in the region containing the current project area. After the opening of the Pacific Portland Cement Company and J.M. Nelson basalt and andesite quarry in the late 19th century, stones and crushed stone were available for the construction of local buildings, bridges, walls, and farm outbuildings. The Pacific Portland Company and J.M. Nelson basalt and andesite quarry were in operation well into the first half of the 1900s when economic slowdown impacted the booming industries.
3.3.4.2 Travis Air Force Base
In 1942, the Fairfield-Suisun Army Air Base (AAB) was activated in response to the Japanese attack on Pearl Harbor (ICRMP 2021). At this time, the Fairfield-Suisun AAB was assigned to the Air Transport Command. During World War II, Fairfield-Suisun AAB’s primary mission was to airlift troops and supplies as well as service and ferry aircraft from California to the Pacific Theater. In 1949, shortly after the initiation of the Cold War, control of the base was transferred to the Strategic Air Command, and its primary function shifted to a major long-range reconnaissance and intercontinental bomber installation.
By 1952, the function of Travis Air Force Base (AFB) was primarily tactical air defense, which included planning and initiating construction of permanent alert and readiness facilities. In 1959, the first B-52 and KC-135 Stratotanker arrived at Travis AFB, at which time the 1501st Air Transport Wing began operating C-97, C-124, C-130, and C-133 aircraft. The first C-141 aircraft was delivered to the base in 1965, which enabled daily flights to Saigon during the Vietnam War. Due to the Vietnam War, base activities increased between 1966 and 1970, and the base facilitated the transport of more than 1 million personnel through the Travis AFB passenger terminal, and an average transport of over 200,000 tons of mail annually. In 1973, the first prisoners of war to return to the United States arrived at Travis AFB, following the signing of the cease-fire agreement in Paris. Notably, Travis AFB participated in Operation Babylift in 1975, in which more than 3,300 orphaned infants and children were transported to the United States from war-torn regions of Southeast Asia (Wilderman 2014).
3.3.5 Sacramento Northern Railway
The SNRW alignment began as the Northern Electric Railroad (NERR), which commenced operations in 1913. The NERR extended from Walnut Creek across Suisun Bay to a terminal in Fairfield, California. During construction of the Suisun Bay crossing, the entire train was ferried by boat to a landing near Suisun City, and construction of the drawbridges to facilitate ferry crossing began in 1912, and enabled the ferry service to operate until its closing in 1953 (Corey 2006). By 1921, the NERR was bankrupt, and by 1929, the SNRW was created after the NERR and another electric interurban line merged together (Nelson 2000). The SNRW changed ownership many times throughout history.
The segment of the SNRW intersecting the project area is a portion of the Suisun-Vacaville branch of the SNRW to Western Pacific’s San Francisco-Sacramento line (Gross 2002). A nearby approximately 2-mile segment of the SNRW is included in the Sacramento Northern Railway Historic District, which was listed in the NRHP in 2012. The NRHP-listed segment includes restored, operational track as well
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 3-8 as inoperational right-of-way, and begins near Bird’s Landing Road, extending south to the former Montezuma Station, near the Suisun Marsh Salinity Control Gate.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 4-1
4.0 RECORD SEARCH AND LITERATURE REVIEW
An LSA archaeologist initiated a record search of the project area and surrounding 0.5-mile radius on December 22, 2025, through the California Historical Resources Information System (CHRIS), which was conducted by staff of the Northwest Information Center (NWIC), located at California State University, Sonoma, in Rohnert Park, California. Following the results, LSA archaeologists reviewed literature obtained from the NWIC. Results from the database search yielded one previously recorded archaeological site that overlaps the project area (P-48-000199), consisting of a historic-era railroad grade. Additionally, there were three previously recorded ancestral Native American resources and four historic-era sites within the 0.5-mile buffer. The record search results also showed 10 previous cultural resource investigations within the project area, and seven investigations within the 0.5-mile radius of the project area. After these initial results, the project area was expanded to include a segment of Peabody Road. On April 28, 2026, LSA updated the record search to include the expanded project area, which yielded no additional results.
4.1 SACRED LANDS FILE
On December 22, 2025, LSA requested a record search of the Sacred Lands File (SLF) held by the Native American Heritage Commission (NAHC). On December 22, 2025, Melina Carlos of the NAHC responded that the results of the record search were negative and provided a list of tribal contacts who may have additional information regarding the survey area (Appendix B). Native American consultation is a government-to-government process and the City, as CEQA lead agency, has retained LSA to assist in Native American consultation in accordance with Assembly Bill (AB) 52 and pursuant to CEQA Section 15064.5. Documentation of this correspondence is provided in Appendix C.
The United States Bureau of Reclamation is the lead agency per the National Environmental Policy Act and is responsible for notifying applicable tribal parties of project details for comment pursuant to Section 106 of the National Historic Preservation Act as amended (54 United States Code §306108).
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 4-2 Figure 4: Records Search Results Map
CONFIDENTIAL
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 5-1
5.0 INVENTORY METHODS
This section describes the field methods implemented to conduct a cultural resources inventory of the project area. The cultural resources inventory was conducted by a team of LSA archaeologists as a Class III intensive pedestrian survey of approximately 124.4 acres of land. Implementation of this cultural resources inventory was the responsibility of the LSA Principal Investigator and Field Director, who supervised and ensured compliance with all applicable cultural resources management regulations. Brieann DeOrnellas, M.A., RPA, exceeds the Secretary of the Interior’s (SOI) Professional Qualifications Standards (36 Code of Federal Regulations [CFR] 61 and 48 Federal Register [FR] 44716) for archaeology and served as the Principal Investigator and Field Director. Fieldwork was assisted by LSA Field Archaeologists Anthony Davolio, B.A., and Bruce Flores.
5.1 SURVEY METHODS
A Class III cultural resources intensive pedestrian survey of the project area was conducted from June 9 – 10, 2026. All work was completed in accordance with the SOI’s Standards and Guidelines for Archaeology and Historic Preservation (48 FR 44716, September 29, 1983) and recorded or directed by personnel individually meeting the qualifications in 36 CFR Part 61. Implemented survey methodologies include the following:
• A crew of three archaeologists conducted the survey for 2 days. • The survey was guided by background shapefiles of the project area and previous resources uploaded to the Esri ArcGIS FieldMaps application on a Samsung S24+ smartphone. • The crew systematically covered 100 percent of the project area—excluding water treatment plant structures and ponds—with visual inspection along parallel transect intervals spaced no more than 10 meters (32.8 feet) apart.
• A sub-meter accuracy Skadi GNSS receiver connected via Bluetooth to a Samsung S24+ smartphone was used to accurately survey the project area. The Skadi GNSS receiver was used to point-plot (as applicable) artifacts, features, relevant landscape attributes, roads, and site disturbances on a map.
• Photographs were taken using the Camera app on a Samsung S24+ smartphone to document survey parcel overviews. Photos and associated data were logged on specialized LSA Photo Log forms.
• Detailed notes were taken of encountered resources, the project area, ground visibility, and survey coverage. Resources, including historic-era sites, and isolated artifacts were recorded on specialized forms.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-1
6.0 INVENTORY RESULTS
On June 9 – 10, 2026, LSA conducted a Class III cultural resources intensive pedestrian survey of the project area. The survey began at the southwestern end of the project area and concluded with a survey of the northern end. A total of 100 percent of the project area—excluding the North Bay Regional Water Treatment Plant (NBRWTP) buildings—was inventoried at an intensive Class III level.
Ground visibility was poor-to-good, ranging from 0 to 90 percent, and was limited by dense vegetation and modern development. The survey yielded a total of three historic-era cultural resources and one precontact isolated find (Figure 5). Of the historic-era resources recorded, first is the previously recorded Sacramento Northern Railway (SNRW) segment that intersects the project area (P-48- 000199), second is a small segment of the Putah South Canal (WY-01), and third is the Peabody Road alignment (WY-02) (Table E). In addition, LSA recorded isolated find WY-ISO-01, which is an ancestral Native American bifacial flake tool comprised of cryptocrystalline silicate (CCS) (Table A).
The majority of the project area was a large, grassy field, bordered by water treatment plant structures, rows of oak trees, a solar farm, and the Putah South Canal. Nearly the entire project area has been heavily disturbed due to urban development, water treatment plant activities, and other landscape modifications (Figure 6). A long segment of the project area also includes a segment of Peabody Road. The road appears to be quite new and the open field appears to have previously undergone a number of earthmoving activities including grading and mechanical excavation.
Although some native soils were visible, most, if not all, appear to have been previously disturbed.
Therefore, any surficial cultural deposits that may have existed within the project area have likely been displaced or destroyed.
The project area and surrounding landscape consist of urban residential neighborhoods, a prison, and, in the distance, Suisun Marsh, rolling hills, and oak-studded grasslands. The overstory was sparse and primarily included coast live and valley oak, Mount Atlas mastic tree (Pistacia atlantica), and the understory consisted of coyote brush (Baccharis pilularis), rabbitfoot grass (Polypogon monspeliensis), broadleaved pepperweed (Lepidium latifolium), purple star-thistle (Centaurea calcitrapa), wild oat (Avena fatua), bristly ox tongue (Helminthotheca echioides), purple salsify (Tragopogon porrifolius), and grasses.
Table A: Archaeological Sites Within the Project Area
Resource ID Trinomial Age Site Type NRHP / CRHR
Eligibility
P-48-000199 CA-SOL-377H H A segment of the Sacramento Northern Railway grade. NE WY-01 H A segment of Putah South Canal NE
WY-02 H A segment of Peabody Road. NE
Source: LSA Site Survey (2026).
CRHR = California Register of Historical Resources H = historic era NE = Not Eligible
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-2 Table B: Isolates Within the Project Area
Resource ID Resource Type Age Site Type NRHP / CRHR
Eligibility
WY-ISO-01 Isolate P A cryptocrystalline silicate bifacial flake tool. NE Source: LSA Site Survey (2026).
CRHR = California Register of Historical Resources H = historic era NE = Not Eligible
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-3 Figure 5: Survey Results Map
CONFIDENTIAL
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-4 Figure 6: Project area overview. View southeast.
6.1 UPDATED RESOURCES
6.1.1 Site P-48-000199 / CA-SOL-377H
Site P-48-000199 is a historic-era SNRW segment that formerly served as a passenger-commuting and agricultural commodity transport facility within and through Solano County. In 1914, a portion of this segment was an isolated rail that connected Suisun City to Vacaville and, by 1930, it was linked to the main line of the SNRW via the Vacaville Junction. The mail line extended from San Francisco to Chico, through Sacramento, providing transport services to the Bay Area and the Valley.
This resource has a complex recordation history and was originally recorded in 1992 by William Self Associates as the historic-era SNRW alignment. Features of the site in the 1992 record include the elevated railroad grade itself, wooden trestles, and remnants of the Montezuma Station and Depot, although the structures themselves were gone. In addition, numerous isolated historic artifacts were recorded intermittently along the railroad grade. Noted artifacts included clear and amber glass fragments, pottery sherds, railroad spikes, ceramic fixture pieces, and terra-cotta clay water pipe.
Noted concentrations included three refrigerators, one washing machine, six tires, wooden boards, nails, other building materials, ceramic, electrical fixture fragments, fire brick, wire, metal fragments, a piston rod from a Ford automobile (1920s), and one possible Chinese celadon fragment. Site disturbances including cattle trampling, vehicle and machinery access, and natural deterioration were observed. In the decades following the original recordation, additional segments of the SNRW have been recorded or updated many times.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-5 In April 1999, Jones and Stokes Associates recorded five segments of the SNRW and described the railroad as abandoned and observed the rails had been removed. Most of the berm was reportedly destroyed, though it still remained in some areas. The SNRW was recorded to largely retain no other integrity.
In August 1999, Jones and Stokes Associates recorded a SNRW combination wooden trestle and steer girder span bridge with concrete piers, which was noted to be in functional condition. Over the subsequent years, numerous other segments and related features of the SNRW were recorded (Nelson 2000; Martin et al. 2000; Martin 2002; Mead & Hunt, Inc. 2010; Huddleson 2010; Porras et. al. 2013; Ugan et. Al. 2016; Webb 2018), some of which included additional features such as a large swing bridge that crossed Montezuma Slough, a 12.9-mile segment including heavily degraded ballasts, trestles, grades (Martin et. al 2001; Corey 2006; Brookshear 2012; Sims 2019), and railway spur segments (Gross 2002; Holland 2013).
Figure 7: Overview of Segment 1 of P-48-000199. View south-southeast.
In June 2026, LSA relocated a 1-mile plotted segment of the greater SNRW resource, and impacts were recorded to update the record. This segment is oriented northwest-southeast and spanning from Peabody Road in Vacaville, California to the northern end of the NBRWTP property in Fairfield, California (Figure 7). Upon this visit, only four interrupted segments of an elevated earthen grade remained of the plotted grade, and these segments were punctuated by disturbances including the construction of the Putah South Canal, the NBRWTP, and various other mechanical earth-moving activities. The integrity of this portion of the site is heavily degraded. No other features were observed. No associated artifacts were identified.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-6
6.2 NEW RESOURCES
Two sites (WY-01 and WY-02) as well as one isolated find (WY-ISO-01) were identified and formally recorded. Specialized Department of Parks and Recreation (DPR) 523 Series forms for sites WY-01 and WY-02 are available in Appendix D. The isolated find was recorded on a specialized LSA form and is available in Appendix E.
6.2.1 Site WY-01
This resource is a historic-era site consisting of a segment of the Putah South Canal that was constructed sometime in the 1950s and was operational by 1964 (NETR 2025). A majority of the portion of the canal that intersects the project area flows beneath a large, improved culvert bridge.
The canal was excavated beneath the original culvert bridge during construction in the 1950s, allowing it to pass beneath the SNRW. Currently, the entire SNRW elevated grade has been removed from the bridge, and is now is a surface-level, unpaved gravel road used for service vehicles. The canal is composed of concrete with a trapezoidal form (Figure 8). The top width of the canal is 30 feet, and the bottom width was not measured or estimated, as the canal was filled with water. No associated features or artifacts were observed.
Figure 8: WY-01 overview, east side of culvert bridge and Putah South Canal.
View south-southwest.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-7
6.2.2 Site WY-02
This resource is the historic-era segment of the Peabody Road alignment. This alignment has a north-south orientation, and has been operational since at least 1908. Upon LSA’s 2026 site visit, the road and immediate surroundings had been vastly improved and urbanized (Figure 9). No associated features or artifacts were observed. While this Peabody Road alignment was originally constructed during the historic period, the continuous improvements and regional development renders this resource essentially modern.
Figure 9: Overview of WY-01, Peabody Road. View south.
6.2.3 WY-ISO-01
This isolated find is an ancestral Native American bifacial formed flake tool end (Figures 10 – 11). It was discovered at the base of an earthen SNRW cut just north of two vernal pools. It is composed of a butterscotch brown CCS secondary flake with 25 percent cortex, has been formed using fine percussion and rough pressure, and appears to have been heat-treated. Mild use-wear is evident on a distal margin. The isolate may have eroded out of the cut wall on the western side of SNRW grade.
6.3 PRELIMINARY CALIFORNIA REGISTER OF HISTORICAL RESOURCES ELIGIBILITY
RECOMMENDATIONS
The objective of this project is to systematically inventory and evaluate cultural resources and to make recommendations if sites are eligible for inclusion in the CRHR. One previously recorded site,
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-8 two newly identified archaeological sites, and one isolated find were discovered within the project area and must be evaluated for inclusion in the register.
In Public Resources Code (PRC) Section 5024.1, “Historic Resources” are defined as a resource listed in or determined to be eligible by the State Historical Resources Commission, for listing in the CRHR.
Generally, a resource shall be considered by the lead agency to be “historically significant” if the resource meets the criteria for listing on the CRHR (PRC Section 5024.1), including:
3. A resource listed in or determined to be eligible by the State Historical Resources Commission, for listing in the CRHR (PRC, Section 5024.1).
4. A resource included in a local register of historical resources, as defined in Section 5020.1(k) of the PRC or identified as significant in a historical resource survey meeting the requirements of Section 5024.1(g) of the PRC.
5. Any object, building, structure, site, area, place, record, or manuscript which a lead agency determines to be historically significant or significant in the architectural, engineering, scientific, economic, agricultural, educational, social, political, military, or cultural annals of California may be considered to be a historical resource, provided the lead agency’s determination is supported by substantial evidence in light of the whole record. CRHR Criterion are as follows:
a. Is associated with events that have made a significant contribution to the broad patterns of California’s history and cultural heritage;
b. Is associated with the lives of persons important in California’s past; c. Embodies the distinctive characteristics of a type, period, region, or method of construction, or represents the work of an important creative individual, or possesses high artistic values; or
d. Has yielded, or may be likely to yield, information important in prehistory or history.
6. The fact that a resource is not listed in, or determined to be eligible for listing in the California Register of Historical Resources, not included in a local register of historical resources (pursuant to Section 5020.1(k) of the Public Resources Code), or identified in a historical resources survey (meeting the criteria in Section 5024.1(g) of the Public Resources Code) does not preclude a lead agency from determining that the resource may be an historical resource as defined in Public Resources Code Sections 5020.1(j) or 5024.1.
7. A cultural resource’s significance must be demonstrated under one of the CRHR criterion described above, and it must retain its historic integrity. Cultural resources integrity is determined using the CRHR’s seven aspects of integrity: location, design, setting, materials, workmanship, feeling, and association. The CRHR criteria are tied to CEQA, as any resource that meets the above criteria and retains its integrity is considered to be a historical resource under CEQA.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-9 To determine whether the project undertaking could affect CRHR eligible properties, cultural resources, including archaeological and architectural properties, were inventoried and evaluated for eligibility for listing in the CRHR in accordance with CEQA requirements. The resources identified during the field survey have been evaluated for inclusion in the CRHR to the extent possible with the information available.
6.3.1 P-48-000199 (CA-SOL-377H) Eligibility
Site P-48-000199 is a segment of the historic-era SNRW. Although the SNRW resource as a whole is associated with a significant historical event, including the early economic development of the region, the portion of the railway within the current project area consists of four short segments of an abandoned railroad grade spanning from the northernmost boundary Fairfield into the southernmost end of Vacaville. These four segments of the SNRW grade consist only of raised or flush earthen mounds that are punctuated by former mechanical excavation and sloughing from water saturation. In addition, the grade segments no longer have rails, ties, or any other infrastructural features or artifacts. Therefore, a majority of the integrity of these segments has been destroyed and do not contribute to the overall significance of the overall SNRW infrastructure.
Due to the significant degradation of this segment of the site and a lack of associated features or artifacts, the segment of this resource individually does not retain integrity of association with events that have made a significant contribution to the broad patterns of our history (Criterion 1).
The resource cannot be associated with the lives of persons significant in our past (Criterion 2). This segment of the SNRW does not embody distinctive characteristics of a type, period, or method of construction, or represent the work of an important creative individual, and does not possess high artistic or spiritual values (Criterion 3). Additional investigation is unlikely to yield new information regarding context that could substantially change the resource description nor to yield information important in prehistory or history (Criterion 4). As such, the segment of site P-48-000199 that intersects with the current project area appears to be ineligible for inclusion in the CRHR under all criteria.
6.3.2 WY-01 Eligibility
This resource is a historic-era site consisting of a segment of the Putah South Canal consisting of a large, improved culvert bridge and a short section of the canal that flows beneath the bridge. Due to the substantial modernization and modification of this segment of the canal and a lack of associated historic-era features or artifacts, the segment of this resource individually does not retain integrity of association with events that have made a significant contribution to the broad patterns of our history (Criterion 1). In addition, this segment of the canal cannot be associated with the lives of persons significant in our past (Criterion 2). The resource does not embody distinctive characteristics of a type, period, or method of construction, nor does it represent the work of an important creative individual or possess high artistic or spiritual values (Criterion 3). Additional investigation of this segment of the Putah South Canal is extremely unlikely to yield new information regarding context that could substantially change the resource description nor to yield information important in prehistory or history (Criterion 4). As such, the segment of the Putah South Canal comprising site WY-01 appears to be ineligible for inclusion in the CRHR under all criteria.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx «08/17/26» 6-10
6.3.3 WY-02 Eligibility
This resource is the historic-era segment of the Peabody Road alignment. Due to the substantial and continuous improvements and modification of this segment of the road, as well as the lack of associated historic-era features or artifacts, this individual segment of the road does not retain integrity of association with events that have made a significant contribution to the broad patterns of our history (Criterion 1). In addition, this segment of the road cannot be associated with the lives of persons significant in our past (Criterion 2). The resource does not embody distinctive characteristics of a type, period, or method of construction, nor does it represent the work of an important creative individual or possess high artistic or spiritual values (Criterion 3). Additional investigation of this segment of the road is extremely unlikely to yield new information regarding context that could substantially change the resource description nor to yield information important in prehistory or history (Criterion 4). As such, the segment of the Peabody Road comprising site WY-02 appears to be ineligible for inclusion in the CRHR under all criteria.
6.3.4 WY-ISO-01 Eligibility
As an isolated find, WY-ISO-01, is categorically ineligible for inclusion in the CRHR under all criteria.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 7-1
7.0 SUMMARY AND CONCLUSIONS
Under Public Resources Code (PRC) § 5024 and State California Environmental Quality Act (CEQA) Guidelines § 15064.5, several categories of impact findings are used to describe the level of significance of a project’s effect on historical resources, including archaeological sites, built environment resources, and cultural resources.
7.1 ASSESSMENT OF EFFECTS
Impact findings with their definitions under CEQA and PRC Section 5024 are as follows:
1. No Impact: The project will not affect any known or potential historical or cultural resources.
2. Less than Significant Impact: The project affects a historical resource in a way that does not cause a substantial adverse change in the significance of that resource.
3. Less than Significant with Mitigation Incorporated: The impact would be significant without mitigation, but specific mitigation measures reduce it to a less-than-significant level.
4. Significant Impact: The project will cause a substantial adverse change in the significance of a historical resource.
5. Significant and Unavoidable Impact: The impact cannot be mitigated to a less-than-significant level, even with feasible measures.
7.1.1 P-48-000199 (CA-SOL-377H) Finding of Effect
The segment of site P-48-000199 that intersects the project area lacks historic integrity and is individually ineligible for listing in the CRHR and does not contribute to the historic significance of the broader Sacramento Northern Railway (SNRW). Furthermore, this segment of P-48-000199 is ineligible for inclusion in the California Register of Historical Resources (CRHR). As such, LSA recommends a finding of Less than Significant Impact, and no field mitigation measures such as monitoring are required.
7.1.2 WY-01 Finding of Effect
The segment of Putah South Canal that intersects the project area lacks historic integrity and is individually ineligible for listing in the CRHR and does not contribute to the historic significance of the broader Putah South Canal. Furthermore, this segment of WY-01 is ineligible for inclusion in the CRHR. As such, LSA recommends a finding of Less than Significant Impact, and no mitigation measures such as monitoring are required.
7.1.3 WY-02 Finding of Effect
The segment of Peabody Road that intersects the project area lacks historic integrity, is individually ineligible for listing in the CRHR, and does not contribute to the historic significance of the historic Peabody Road alignment. Furthermore, this segment of WY-02 is ineligible for inclusion in the CRHR.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 7-2 As such, LSA recommends a finding of Less than Significant Impact, and no mitigation measures such as monitoring are required.
7.1.4 WY-ISO-01 Finding of Effect
This isolated formed flake tool is categorically ineligible for listing in the CRHR. However, prehistoric resources are commonly in or beneath Holocene-age soil deposits (Meyer and Rosenthal 2007) and , although the soils in the immediate vicinity of the isolate have a plowing disturbance from 0 – 15 centimeters below the surface (cmbs) (0 – 5.9 inches), there is an A Horizon from 15 – 38 cmbs (5.9 –
14.9 inches) that may contain buried cultural deposits. The isolate itself appears to have possibly fallen out of the eroding cut wall on the western side of SNRW grade. In addition, the isolate was found just north of two vernal pools. The combination of these factors indicates that the locations of the project area that contain these soil series have a moderate-to-high sensitivity for subsurface cultural deposits. As such, LSA recommends a finding of Less than Significant with Mitigation Incorporated.
7.2 RECOMMENDATIONS
The segment of site P-48-000199 that intersects the project area is ineligible for listing in the CRHR and no field mitigation measures such as monitoring are required. However, given the antiquity of the former site recordation and the subsequent impacts to the site, a full update to the record is required. Therefore, prior to project-related construction, site P-48-000199 must receive a full formal update provided on Office of Historic Preservation (OHP) Department of Parks and Recreation (DPR) 523 Series forms, and submitted to the Northwest Information Center (NWIC).
The segment of site WY-01 (Putah South Canal) that intersects the project area is ineligible for listing in the CRHR and no field mitigation measures such as monitoring are required. However, this segment of the site had not been previously recorded, thus a formal recordation of the site must be provided on OHP DPR 523 Series forms prior to project-related construction and subsequently submitted to NWIC.
The segment of site WY-02 (Peabody Road) that intersects the project area is ineligible for listing in the CRHR and no field mitigation measures such as monitoring are required. However, this segment of the site had not been previously recorded, thus a formal recordation of the site must be provided on OHP DPR 523 Series forms prior to project-related construction and subsequently submitted to NWIC.
Although WY-ISO-01 (formed flake tool) is categorically ineligible for listing in the CRHR, the isolate appears to have possibly fallen out of the eroding cut wall on the western side of SNRW grade from a buried subsurface ancestral Native American deposit. This, combined with the proximity to water and Holocene-aged soils, indicates a high sensitivity for subsurface cultural resources in the vicinity of the site and the content and context of buried cultural deposits at deeper levels beneath the ground surface remains unknown. Therefore, WY-ISO-01 at its intersection with site P-48-000199 and the immediate vicinity is considered an archaeologically “sensitive area”, and LSA recommends full-time archaeological monitoring in this location within the northeastern project area.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 7-3
7.2.1 Worker Environmental Awareness Program
Prior to commencing construction activities (and thus prior to any ground disturbance on the proposed project site), a qualified archaeologist shall conduct initial Worker Environmental Awareness Program (WEAP) training of all construction personnel, including supervisors, present at the outset of the project construction work phase, for which the lead contractor and all subcontractors shall make their personnel available. The training shall describe the type of resources that may be identified, procedures to be followed during ground disturbance, and protocols that apply in the event that unanticipated resources are discovered. The crew shall be cautioned not to collect artifacts and directed to inform a construction supervisor in the event that cultural remains are discovered during the course of construction. After presenting the WEAP training, the Qualified Archeologist will flag the resource for avoidance. A qualified archaeologist is someone who either meets the Secretary of the Interior’s (SOI) Professional Qualification Standards for archaeology (48 Federal Register 44738) and is a Registered Professional Archaeologist or has a Bachelor of Arts in archaeology or a closely related field and is a Registered Archaeologist.
7.2.2 Notification of Affiliated California Native Tribes On April 10, 2026, the City of Fairfield (City) received an email requesting consultation. Yvonne Perkins, Tribal Historic Preservation Officer of the Yocha Dehe Wintun Nation (YDWN), reviewed the project and concluded that it is within the aboriginal territories of the Yocha Dehe Wintun Nation.
Therefore, the YDWN have a cultural interest and authority in the proposed project area and would like to initiate a formal consultation with the City.
On May 6, 2026,the City conducted the tribal consultation meeting. During the meeting, YDWN representatives informed the City of sensitive areas of concern that will require tribal monitoring during construction. These areas include the vicinity of Union Creek, South Putah Creek, and near the State prison. Once the Vacaville Pipeline Alignment is finalized, a follow-up meeting will be scheduled. Overall, the tribe has requested that City execute the Monitoring Agreement during construction.
Within 14 days of determining that the application for this project is complete or a decision by the City is made to undertake a project, the City shall provide formal notification to the designated contact or a tribal representative of traditionally and culturally affiliated California Native American tribes that have requested to receive such notice from the City. The written notification shall include a brief description of the proposed project and its location, project contact information, and a notification that the California Native American tribe has 30 days to request consultation pursuant to California PRC § 64352.4.
The City has received a formal written request by the designated tribal representative of the YDWN present at the project area before or during construction activities. Therefore, pursuant to PRC Section 64352.4, the City must have a tribal cultural representative to identify or monitor sites or objects of significance to Native Americans or to provide construction worker tribal cultural resources awareness training, including applicable regulations and protocols for avoidance, confidentiality, and culturally appropriate treatment. The tribal cultural representative shall have the ability to request that work be stopped, diverted, or slowed if sites or objects of significance to Native Americans are encountered within the direct impact area and shall be consulted for
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 7-4 recommendations regarding the appropriate treatment of such sites or objects. Any compensation for time and expenses related to this activity shall be borne by the project proponent.
7.2.3 Archaeological Monitoring
Any project-related earth-moving activities (including but not limited to grading, demolition, trenching, hand excavation, and/or new construction) have the potential to impact subsurface archaeological or cultural resources. Prior to any grubbing, grading, or ground-disturbing activities, the following measures shall be implemented:
An archaeologist shall monitor construction-related ground disturbance within the vicinity of WY-ISO-01, as it is a location identified as having the potential to include subsurface archaeological, cultural, or tribal cultural resources that could be impacted through ground-disturbing activities related to the construction of the project. Monitoring in this vicinity should continue until the project archaeologist determines that there is a low potential for encountering subsurface archaeological, cultural, or tribal cultural resources (see below). An archaeologist that meets the SOI professional qualifications standards for archaeology shall oversee the monitoring. Any compensation for time and expenses related to this activity shall be borne by the project proponent.
Furthermore, areas identified by the YDWN sensitive areas of concern shall require tribal monitoring during construction. These areas include the vicinity of Union Creek, South Putah Creek, and near the State prison.
It is possible that if, after a period of time during which daily monitoring has been negative for cultural resources and site construction activities are within what is identified to be predominantly excavated nonnative sediment or sterile horizons of native soils, or all construction activities are taking place a distance of 50 feet or more from the sensitive area, monitoring can be reduced to part-time spot checks with permission of the project SOI qualified archaeologist. If in-situ cultural resources are discovered during this phase of the project, additional archaeological investigation (such as subsurface testing) may be required.
7.2.4 Treatment of Unanticipated Discoveries
If unanticipated buried cultural materials are encountered during project-related activities that may be classified as historical, unique archaeological, or tribal cultural resources, ground-disturbing activities shall cease immediately, and the Planning Manager shall be notified to coordinate with the State Historic Preservation Officer (SHPO), local Native American tribes, and any additional landowner or agency stakeholders. The resources will be evaluated by a qualified archaeologist and, at the Planning Manager’s discretion, a tribal cultural monitor. If the resources are determined to be historical, unique archaeological, or tribal cultural resources, then a plan for avoiding the resources shall be prepared. If avoidance is infeasible, then all significant cultural materials recovered shall be, as necessary and at the discretion of the consulting archaeologist, subject to scientific analysis, professional museum curation, and documentation according to current professional standards. Any plan for avoidance or mitigation shall be subject to the approval of the Planning Manager.
If any impacts to tribal cultural resources are identified, consultation among the Planning Manager, the SHPO, and tribes should be coordinated to determine the course of action. The SHPO may request that the City complete a formal evaluation. When precontact archaeological sites are
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 7-5 involved, such evaluations should be made in consultation with the appropriate Native American tribal representatives. If the resource is not formally evaluated, it should be assumed to be eligible for inclusion on the NRHP/CRHR and managed accordingly.
As used herein, “historical resource” means a historical resource as defined by State CEQA Guidelines Section 15064.5(a); “unique archaeological resource” means unique archaeological resource as defined by PRC Section 21083.2(g); and “tribal cultural resource” means tribal cultural resource as defined by PRC Section 21074. Collectively, these terms describe “significant cultural materials.”
7.2.5 Treatment of Human Remains
Although unlikely, human remains, including graves and cemeteries, could be encountered during excavation and the County Coroner must be immediately notified. Human remains, graves, and cemeteries are protected by State and federal law. Within nonfederal lands, California Health and Safety Code Sections 7050.5, 7051, and 7054; the California Penal Code, and PRC Section 5097 protect human remains from damage, defacement, or disinterment and establish civil and criminal penalties. This applies to anyone who may knowingly loot precontact or historic-era Native American or other graves.
Additional interested parties that may be notified when human remains are discovered include the archaeological contractors, osteologists, federal agencies, the NAHC, Tribal Historic Preservation Officers, Native American tribal members, and the SHPO, and they may become involved as part of compliance measures. Because human remains and funerary objects are often viewed as sacred, finds must be treated with respect and sensitivity toward interested parties shown. All finds and remains should be left in place and undisturbed until all appropriate and required entities have been contacted, the remains have been formally identified as human, and a course of action has been agreed on by the parties. If finds are determined to be nonhuman, no further notification or action are necessary, although additional archaeological assessment may be necessary.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 8-6
8.0 REFERENCES
Baumhoff, M.
1963 Ecological Determines of Aboriginal California Populations. University of California Publications in Archaeology and American Ethnology, Volume 49(2), 155-236. University of California, Berkeley.
Bennyhoff, J.A
1977 The Ethnogeography of the Plains Miwok. Center for Archaeological Research at Davis, Number 5. University of California, Davis.
Brechin, Gray
1999 Imperial San Francisco: Urban Power, Earthly Ruin. University of California Press, Berkeley.
Byrd, B., A. Whitaker, P. Mikkelsen, and J. Rosenthal
2017 Caltrans District 4 Research Design and Treatment Plan for Native American Archaeological Resources in the San Francisco Bay-Delta Region. Far Western Anthropological Research Group, Inc., Davis, California. Draft report submitted to California Department of Transportation, District 4 Office, Oakland, California.
California Geological Survey
2002 California Geomorphic Provinces. California Geologic Survey Note 36. California Department of Conservation.
Castillo, Edward D.
1978 The impact of Euro-American exploration and settlement. In California, Robert F Heizer, ed. pp. 99-127. In Handbook of North American Indians. vol. 8, William G. Sturtevant, general ed. Smithsonian Institution, Washington, D.C.
Corey, C.
2006 Site record for P-48-000199, on file at the California Historical Resources Information System, Northwest Information Center. Prepared by SWCA Environmental Consultants.
Delattre, M.P., R.W. Graymer, V.E. Langenheim, K.L. Knudsen, T.E. Dawson, E.E. Brabb, C.M.
Wentworth, and L.A. Raymond
2023 Geologic and geophysical map of the Stockton 30' x 60' quadrangle, California. California Geological Survey. Regional Geologic Map No. 5. Map Scale 1:100,000. Published 2023.
Dyer, E.H.
1864 Map of the Tract known as the Ex-Mission San José. Photostat on file, Museum of Local History, Fremont, California.
Gross, Charlane
2002 Site record for P-48-000199, on file at the California Historical Resources Information System, Northwest Information Center. Prepared by EDAW, Inc.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 8-7 Governor’s Office of Planning and Research (OPR)
1994 CEQA and Archaeological Resources.
Graves, Alvin Ray
2004 The Portuguese Californians: Immigrants in Agriculture. Portuguese Heritage Publications of California, San Jose, California.
Gregory, Tom
1912 History of Solano and Napa Counties, California. Historic Record Company, Los Angeles.
Groza, Randall G., Jeffrey Rosenthal, Jogn Southon, and Randall Milliken 2011 A Refined Shell Bead Chronology for Late Holocene Central California. In Journal of California and Great Basin Anthropology, Vol. 31, No. 2 (2011), pp. 135-154.
Guedon, Stewart
1977 Boundary Persistence in Southern Alameda County, California. Master’s Thesis, Hayward State University.
Haviland, P.A
1910 Official Map of Alameda County, California, 1910. Tribune Publishing Co., Oakland. On file, Map Library, University of California, Berkeley.
Heizer, R. F.
1949 The Archaeology of Central California. I. The Early Horizon. University of California Press, Berkeley.
Hoover, M.B., H.E. Rensch, E.G. Rensch, and W.N. Abeloe 2002 Historic Spots in California. Fifth edition, revised by D.E. Kyle. Stanford University Press.
Stanford, California.
Howard, Arthur D.
1979 Geologic History of Middle California. California Natural History Guides No. 43. University of California Press, Berkeley, California. 113 pp.
Imboden, Susan
2006 “Interview with Raelene Vieux regarding Vieux family farming and ranching at Vargas Plateau, Fremont, CA.” East Bay Regional Park District.
Integrated Cultural Resources Management Plan (ICRMP)
2021 U.S. Air Force Integrated Cultural Resources Management Plan, Travis Air Force Base. 60th Air Mobility Wing.
Jackson, Robert H. and Edward Castillo
1995 Indians, Franciscans, and Spanish Colonization: the Impact of the Mission System on California Indians. University of New Mexico Press, Albuquerque.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 8-8 Kellogg Soil Survey Laboratory (KSSL)
2025 KSSL snapshot (updated 2025-01-21). National Soil Survey Center, Natural Resources Conservation Service, U.S. Department of Agriculture.
Knudsen, Keith L. Knudsen, Janet M. Sowers, Robert C. Witter, Carl M. Wentworth, and Edward J.
Helley
2000 Description of Mapping of Quaternary Deposits and Liquefaction Susceptibility, Nine-County San Francisco Bay Region, California. U.S. Department of the Interior U.S.
Geological Survey.
Kroeber, A.
1970 Handbook of the Indians of California. Third Edition. California Book Company Ltd., Berkeley. Originally published in 1925.
Jackson, Robert H.
1994 “The Development of San José Mission, 1797-1840.” In Lowell John Bean, ed., The Ohlone Past and Present. Ballena Press, Menlo Park, California. pp. 229-248.
Kyle, Douglas E. (editor)
1990 Historic Spots in California (fourth edition), by Mildred Hoover, Hero E. Rensch, and Ethel G. Rensch. Previously edited by William Abeloe. Stanford University Press, Palo Alto.
Levy, R.
1978 Eastern Miwok. In Handbook of North American Indians, Volume 8, California, R. F. Heizer (Ed.), pp. 398-413. Smithsonian Institution Press, Washington, D.C.
Milliken, Randall
1995 A Time of Little Choice: The Disintegration of Tribal Culture in the San Francisco Bay Area 1769-1810. Ballena Press Anthropological Papers, No. 43.
Milliken, Randall, Richard T. Fitzgerald, Mark G. Hylkema, Randy Groza, Tom Origer, David G. Bieling, Alan Leventhal, Randy S. Wiberg, Andrew Gottsfield, Donna Gillete, Viviana Bellifemine, Eric Strother, Robert Cartier, and David A. Fredrickson.
2007 “Punctuated culture change in the San Francisco Bay Area,” in Terry L. Jones, and Kathryn A. Klar, eds., California Prehistory: Colonization, Culture, and Complexity. Altamira Press, New York. pp. 99–124.
Minor, Woodruff
2002 DPR 523 Primary Record for Vargas Barn, 380 Morrison Canyon Road, Fremont, California.
On file, Northwest Information Center, Sonoma State University.
Moratto, Michael
1984 California Archaeology. Academic Press, New York.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 8-9 Nelson, J.
2000 Site record for P-48-000199, on file at the California Historical Resources Information System, Northwest Information Center. Prepared by Jones and Stokes Associates.
Norris, R.M., and R.W. Webb
1976 Geology of California, John Wiley and Sons, Inc., Santa Barbara.
Nusbaumer, George L.
1889 Official Map of Alameda County, California. Tribune Publishing Co., Oakland. On file, Map Library, University of California, Berkeley.
Patterson, David
1988 “Overseeing the Transition from Ranching to Property Management.” Oral history interview conducted by Ann Lage for the Regional Oral History Office, Bancroft Library. In The Patterson Family and Ranch: Southern Alameda County in Transition, Volume III. The Bancroft Library, Berkeley.
Paulson, L.L.
1876 Hand-book and Directory of Alameda County. Francis and Valentine, San Francisco.
Website: https://archive.org/details/handbookdirector1876paul (accessed June 13, 2025).
Meyer, J. and J. Rosenthal
2007 Geoarchaeological Overview of the Nine Bay Area Counties in Caltrans District 4.
Document S-33600 on file at the Northwest Information Center, Sonoma State University, Rohnert Park.
Shoup, Daniel David
2014 Historic Resources Evaluation Report, Lands of George Project. 3163 Morrison Canyon Road, Alameda County, California, APN 096-0056-003-00.
Shoup, Daniel David and Ward Hill
2024 Historic Resources Evaluation Report Lands of George Project, 3163 Morrison Canyon Road, Alameda County, California.
Shoup, Laurence H. and Randall T. Milliken
1999 Inigo of Rancho Posolmi: The Life and Times of a Mission Indian. Ballena Press, Novato, California.
Thompson and West
1878 Historical Atlas Map of Alameda County, California. Thompson and West, San Francisco.
Weatherspark
2026 Climate and Average Weather Year Round in Fairfield. Website:
https://weatherspark.com/y/1076/Average-Weather-in-Fairfield-California-United-States-Year-Round (accessed October 28, 2025).
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26) 8-10
Wilderman, M.
2014 A Brief History of the 60th Air Mobility Wing and Travis Air Force Base. Prepared for Travis Air Force Base, California.
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26)
APPENDIX A
RECORD SEARCH RESULTS
CONFIDENTIAL
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26)
APPENDIX B
SACRED LANDS FILE SEARCH RESULTS
CONFIDENTIAL
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26)
APPENDIX C
AB 52 CONSULTATION
CONFIDENTIAL
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26)
APPENDIX D
SITE RECORDS
CONFIDENTIAL
C ULTURAL RESOURCE INVENTORY REPORT
J ULY 2026
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\Technical Studies\Cultural\04-Deliverables\NBRWTP Cultural Report_FOR PUBLIC.docx (08/17/26)
APPENDIX E
ISOLATED FIND
CONFIDENTIAL
NORTH B AY REGIONAL WATER T REATMENT PLANT ,
F AIRFIELD -V ACAVILLE WATER WORKS P ROJECT
F AIRFIELD , C ALIFORNIA
MITIGATION MONITORING AND REPORTING P ROGRAM
OCTOBER 2026
\\aznasunifiler2\projects\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Final\North Bay Regional ISMND.docx (10/06/26) This page intentionally left blank
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 1
NORTH BAY REGIONAL WATER TREATMENT PLANT, FAIRFIELD-VACAVILLE WATER WORKS PROJECT (SCH #2026080694)
DRAFT RESPONSE TO COMMENTS
OFFICIAL COMMENT LETTERS
A: Caltrans Division of Aeronautics
Yizhou Wang - [email protected]
Comment A-1:
Caltrans notes that the Project is located within Travis Air Force Base Compatibility Zone D and includes construction of up to two new sludge lagoons that could potentially attract birds or other wildlife. Caltrans recommends that the Project be reviewed for consistency with the Travis AFB Land Use Compatibility Plan (LUCP) bird-strike hazard policies, including preparation of a Wildlife Hazard Analysis (WHA), if applicable, and coordination with the Solano County Airport Land Use Commission (ALUC) and Travis AFB Bird/Wildlife Aircraft Strike Hazard (BASH) Team.
Response A-1:
The comment is acknowledged. The Draft IS/MND identifies the Project as being within Travis AFB Compatibility Zone D and the Outer Perimeter Wildlife Hazard Area and evaluates the potential for Project features to create wildlife-related aviation hazards. Mitigation Measure MM-HAZ-1 requires the City to submit the Project to the Solano County ALUC for consistency review with the Travis AFB LUCP prior to issuance of grading or building permits. If the ALUC, in coordination with Travis AFB, determines that the Project has the potential to attract hazardous wildlife movement, MM-HAZ-1 requires preparation of a WHA consistent with the LUCP and applicable Federal Aviation Administration guidance and incorporation of applicable recommendations into Project design, construction, and operation. Therefore, the comment is addressed by the Draft IS/MND and no revision is necessary.
B: DWR Division of Safety of Dams
Russell Bowlus - 916-565-7613 need email
Comment B-1:
DWR’s Division of Safety of Dams (DSOD) reviewed the Project and determined, based on the information and plans provided, that the Project does not currently meet the criteria for State dam-safety jurisdiction. DSOD requests that it be contacted if subsequent design changes alter the height or storage capacity such that the Project may become subject to DSOD jurisdiction.
Response B-1:
The comment is acknowledged. Based on DSOD’s review of the current Project plans, the Project is not subject to DSOD jurisdiction. If subsequent design modifications change the height or storage
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 2
capacity of Project facilities such that DSOD jurisdiction may apply, the City will coordinate with DSOD as appropriate and no revision is necessary.
C: DWR State Water Project Right-of-Way Management
Zachary Ramsey - [email protected]
Comment C-1:
DWR notes that the Project is located near the State Water Project’s North Bay Aqueduct and that DWR has interests associated with protecting its facilities. DWR states that the Project does not appear to require modification of the existing DWR/Solano County Water Agency 42-inch turnout; however, the Engineering Report identifies the potential installation of a second mechanical screen for redundancy. DWR requests coordination with its Turnouts and Special Projects Section if modifications to the existing turnout or associated facilities are planned.
Response C-1:
The comment is acknowledged. Based on the current Project design, modification of the existing DWR/Solano County Water Agency 42-inch turnout is not anticipated. If subsequent design refinement includes modifications to the existing turnout or associated DWR facilities, the City will coordinate with DWR’s Turnouts and Special Projects Section, as requested.
D: State Water Resources Control Board
Lori Schmitz – [email protected]
Comment D-1:
The State Water Board requests that Tables 1.A and 2.A identify the State Water Resources Control Board as a responsible agency, including the Division of Drinking Water (DDW) for the domestic water supply permit and the Division of Financial Assistance (DFA) for potential Project funding. The letter states that Fairfield and Vacaville will need to apply for a water supply permit amendment for the change in treatment design capacity or process.
Response D-1:
The comment is acknowledged. The State Water Resources Control Board, Division of Drinking Water and Division of Financial Assistance, will be added to Tables 1.A and 2.A as responsible agencies.
Comment D-2:
The State Water Board notes that the Aquatic Resources Delineation Report and Biological Resources Report evaluate a larger study area than the Project impact area and requests clarification regarding how the acreages presented in Table 4.4.B were derived, including whether the reported impacts include both temporary and permanent impacts.
Response D-2:
The comment is acknowledged. Because final design of the transmission pipeline has not been completed, the biological and aquatic resources studies evaluated a broader review area
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 3
encompassing the two potential pipeline alignments and surrounding areas where minor alignment refinements could occur during final design. This approach was intentionally conservative and provides flexibility for reasonable adjustments to the pipeline alignment while identifying the biological and aquatic resources that could potentially be affected by the Project. Table 4.4.B presents the preliminary potential impacts associated with the Project layouts evaluated in the Draft IS/MND rather than the acreage of the larger biological study area. As noted in Table 4.4.B, actual impact acreages may increase or decrease as the design is refined. Provided final design refinements remain within the area evaluated and do not result in new or substantially more severe environmental impacts, such refinements would remain within the scope of the environmental analysis presented in the IS/MND and no revision is necessary.
Comment D-3:
The State Water Board identifies an apparent inconsistency in the Hazards and Hazardous Materials analysis. The Draft IS/MND identifies the impact associated with release of hazardous materials as less than significant but also states that mitigation would reduce the impact to less than significant.
The State Water Board requests identification of the applicable mitigation measures if mitigation is required.
Response D-3:
The comment is acknowledged. The reference to mitigation reducing this impact to a less-than-significant level is inadvertent. The Draft IS/MND concludes that potential impacts associated with the routine transport, use, handling, and potential release of hazardous materials would be less than significant based on compliance with applicable regulatory requirements and established hazardous materials management procedures. No mitigation measure is required for this impact. The Final IS/MND will be revised to correct the inconsistent reference to mitigation.
LATE COMMENTS
Commenter E – California Department of Fish and Wildlife CDFW Comment Letter on September 29, 2026 from Jordan Beaton [email protected] Comment E-1 – California Tiger Salamander
CDFW acknowledges MM-BIO-1 but states that it does not specifically identify California tiger salamander (CTS) as a species for which a CESA incidental take permit (ITP) would be obtained.
CDFW also points to MM-BIO-11's relocation provisions and recommends revising BIO-11 to expressly require a CESA ITP for CTS and federal authorization from USFWS before construction.
E_CDFW
Response E-1:
The comment is acknowledged. The Draft IS/MND identifies California tiger salamander as having a high potential to occur within the Project area and evaluates potential direct and indirect impacts to the species. The Draft IS/MND also includes mitigation measures requiring avoidance and minimization of potential impacts and compliance with applicable federal and State endangered
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 4
species requirements. MM-BIO-1 requires the Project to obtain applicable incidental take authorization for listed species where Project activities may result in take.
To clarify the applicability of this requirement to California tiger salamander, MM-BIO-11 will be revised to expressly state that, if take of California tiger salamander cannot be avoided, the Project shall obtain applicable authorization from CDFW pursuant to CESA and from USFWS pursuant to the federal Endangered Species Act, as applicable, prior to activities that could result in take. The Project shall comply with the terms and conditions of any required authorization.
The requested revision requiring an ITP regardless of whether take would occur is not necessary.
Whether an ITP is required will depend on the final Project design, construction limits, survey results, avoidance measures, and whether take can be avoided. The revised measure provides an enforceable mechanism to ensure that required authorization is obtained if take cannot be avoided.
With implementation of the mitigation measures identified in the IS/MND, potential impacts to California tiger salamander would remain less than significant.
Comment E-2 – Tricolored Blackbird
Comment E-2:
CDFW states that Mitigation Measure BIO-19 does not adequately mitigate potential impacts to tricolored blackbird because the measure states that the preconstruction survey “should” be conducted by a qualified biologist and because the avoidance buffer may be less than 500 feet.
CDFW recommends revising BIO-19 to make the survey mandatory and, if an active colony is identified, require notification to CDFW, a minimum 500-foot no-disturbance buffer unless otherwise approved by CDFW, daily monitoring of active nests, CDFW approval before construction resumes, and an incidental take permit if impacts cannot be avoided.
Response E-2:
The comment is acknowledged. The Draft IS/MND identifies tricolored blackbird as a CESA-listed threatened species, recognizes suitable nesting and foraging habitat within the Project area, and evaluates the potential for Project construction to affect nesting colonies. Mitigation Measure BIO-19 requires preconstruction surveys for Project activities occurring during the nesting season, establishes survey timing and survey areas, and requires an avoidance buffer if an active colony is identified. Project activities are prohibited within the buffer until a qualified biologist determines that the colony is no longer active, and the buffer size is required to be determined in consultation with CDFW.
The City agrees that use of “should” could be interpreted as nonmandatory and will revise BIO-19 to require that the preconstruction survey shall be conducted by a qualified biologist. However, a mandatory 500-foot buffer, daily monitoring, and written CDFW approval before construction may resume are not necessary in all circumstances. BIO-19 already requires consultation with CDFW in establishing the buffer and allows the buffer to reflect site-specific conditions, including the nature of Project activities and existing disturbance. If take of tricolored blackbird cannot be avoided, applicable incidental take authorization would be required pursuant to BIO-1. With this clarification, the mitigation remains adequate to reduce potential impacts to a less-than-significant level.
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 5
Comment E-3 – White-Tailed Kite and Other Nesting Birds Comment E-3:
CDFW states that Mitigation Measure BIO-20 does not adequately mitigate potential impacts to white-tailed kite and other nesting birds because the measure states that a buffer “should” be established if an active nest is identified. CDFW recommends replacing BIO-20 to require surveys within 500 feet of the Project site, including requesting permission to survey adjacent private property; notification to CDFW if an active nest is found; site- and species-specific buffers subject to CDFW written approval; repeat surveys following a work lapse of 5 days or more; authority for the qualified biologist to stop work if nesting birds exhibit abnormal behavior; and monitoring of active nests until young have fully fledged.
Response E-3:
The comment is acknowledged. The Draft IS/MND identifies white-tailed kite and other special-status and migratory birds with potential to nest within or adjacent to the Project site and recognizes that construction could result in direct or indirect impacts to active nests. BIO-20 already requires a qualified biologist to conduct a nesting bird survey within 5 days prior to ground-disturbing work occurring during the February 1–August 31 nesting season. The survey extends up to 500 feet from the Project boundaries to the extent feasible based on surrounding land uses and property ownership.
The City agrees that the use of “should” in the active-nest provisions could be interpreted as nonmandatory. BIO-20 will therefore be revised to require establishment and maintenance of an appropriate buffer around an active nest until the young have fledged or the nest is otherwise inactive. The buffer will continue to be determined by a qualified biologist based on the species, nest location, nature of nearby Project activities, existing disturbance, and other relevant site-specific conditions.
The additional requirements for access to adjacent private property, CDFW notification and written approval of individual buffers, and continuous monitoring of all active nests are not necessary in all circumstances to ensure avoidance of active nests. The existing measure provides for surveys beyond the Project boundaries where feasible and allows a qualified biologist to establish an appropriate species- and site-specific buffer. With the revisions as described, BIO-20 provides an enforceable mechanism to avoid disturbance of active nests, and the impact would remain less than significant with mitigation.
Comment E-4 – Swainson’s Hawk
Comment E-4:
CDFW states that BIO-17 does not adequately address potential impacts to Swainson’s hawk because the measure requires use of the recommended Swainson’s hawk survey methodology only “to the extent feasible.” CDFW also notes that BIO-18 states that foraging habitat compensation “should” be consistent with the Solano Multispecies HCP. CDFW recommends requiring protocol surveys during the nesting season, annual surveys during construction, CDFW approval of the biologist and survey report, a 0.5-mile avoidance buffer unless otherwise approved by CDFW, monitoring of active nests, and an ITP if take cannot be avoided. For BIO-18, CDFW recommends
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 6
making the 3:1 foraging habitat compensation requirement mandatory and requiring CDFW approval of the impact acreage and mitigation before construction.
Response E-4:
The comment is acknowledged. The Draft IS/MND identifies suitable Swainson’s hawk nesting and foraging habitat within and adjacent to the Project area and evaluates potential impacts to active nests and foraging habitat. BIO-17 already requires a qualified biologist to conduct preconstruction surveys within 0.5 mile of the Project site, establish an avoidance buffer around any active nest, prohibit work within the buffer until the young have fledged or the nest is no longer active, and conduct monitoring where Project activities have the potential to adversely affect an active nest.
The measure also provides for consultation with CDFW regarding adjustments to recommended
0.25- or 0.5-mile buffers.
The City agrees that the qualifying language regarding survey methodology should be clarified. BIO-17 will be revised to require that Swainson’s hawk surveys be conducted in accordance with the applicable recommended survey methodology. The existing provisions allowing site-specific buffers established by a qualified biologist in consultation with CDFW will be retained. Requiring CDFW's written approval of the qualified biologist, survey report, and individual buffer determinations is not necessary to ensure implementation of the measure.
The City also agrees that BIO-18 should establish an enforceable habitat compensation requirement.
Accordingly, “should” will be revised to “shall.” BIO-18 already establishes a 3:1 compensation ratio for permanent impacts to suitable valley floor grassland foraging habitat and provides mechanisms for permanent preservation or purchase of credits at a CDFW-approved mitigation bank. With these revisions, potential impacts to Swainson’s hawk would remain less than significant with mitigation.
Additionally, the reference to the “Solano Multispecies HCP (SCWA 2025)” will be corrected and references to specific HCP measures will be revised as appropriate to accurately reflect the current status of the HCP.
Comment E-5 – Burrowing Owl
Comment E-5:
CDFW states that the Draft IS/MND does not adequately evaluate and mitigate potential impacts to burrowing owl. CDFW notes that BIO-14 does not define the survey buffer and that the existing 250- foot breeding-season avoidance buffer may be inadequate. CDFW recommends replacing BIO-14 with a substantially expanded measure requiring a habitat assessment within 500 meters (1,640 feet), protocol-level surveys where suitable habitat is present, annual nesting- and wintering-season surveys, CDFW review/approval, a 1,640-foot avoidance buffer when owls are detected unless otherwise approved, monitoring, and consultation/ITP authorization if take cannot be avoided.
CDFW also recommends additional requirements addressing habitat/nest-site loss and construction materials that could entrap or shelter owls.
Response E-5:
The comment is acknowledged. The Draft IS/MND identifies burrowing owl as a CESA candidate species and California Species of Special Concern, identifies suitable breeding, wintering, and
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 7
foraging habitat within and near the Project area, and recognizes documented occurrences within and adjacent to the Project area.
BIO-14 already requires a qualified biologist to conduct preconstruction surveys in accordance with CDFW’s 2012 Staff Report on Burrowing Owl Mitigation, including surveys during the applicable nesting or wintering season, annual surveys during Project construction, and a final survey within 24 hours prior to ground disturbance. If an active burrow cannot be avoided or adequately protected, BIO-14 also requires applicable incidental take authorization and provides for avoidance or relocation consistent with CDFW requirements.
The City agrees that BIO-14 can be clarified by specifying that the survey area shall be established consistent with the CDFW 2012 Staff Report rather than referring only to a “sufficient buffer zone.” The City also agrees that avoidance buffers should reflect the type and intensity of Project disturbance and site-specific conditions. However, requiring a 1,640-foot no-work buffer for every occupied burrow, regardless of the activity or site conditions, and requiring CDFW written approval of each habitat assessment, survey result, and buffer determination are not necessary to ensure avoidance of take. The qualified biologist will establish appropriate avoidance measures consistent with the CDFW 2012 Staff Report and applicable CESA requirements.
In addition, BIO-15 and BIO-16 already require compensation for permanent loss of suitable burrowing owl habitat and nest sites, including permanent protection and long-term management of replacement habitat.
Comment E-6 – Crotch’s Bumble Bee
Comment E-6:
CDFW states that BIO-9 does not clearly require the minimum survey effort identified in CDFW’s 2023 Survey Considerations for California Endangered Species Act Candidate Bumble Bee Species.
CDFW recommends replacing BIO-9 to restrict ground disturbance to August 15–October 15 or, for work between June 15 and August 14, require a minimum of three focused surveys spaced at least three weeks apart, including surveys during peak flight and bloom periods. CDFW also recommends annual surveys, CDFW approval of the biologist and survey protocol, reporting and notification requirements, a minimum 50-foot buffer around active colonies, and an ITP if impacts cannot be avoided.
Response E-6:
The comment is acknowledged. The Draft IS/MND identifies Crotch’s bumble bee as a CESA candidate species, recognizes that suitable habitat occurs within and adjacent to the Project area, and identifies potential impacts from ground disturbance and loss of suitable nesting and foraging habitat. BIO-9 already requires a qualified biologist to conduct focused surveys of all suitable habitat within and adjacent to the Project before ground-disturbing activities and requires surveys to follow CDFW’s 2023 survey guidance or any subsequent CDFW-approved protocol.
The City agrees that BIO-9 can be clarified to expressly require the number and timing of focused surveys specified in the applicable CDFW survey guidance. The existing measure also requires
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 8
establishment of non-disturbance buffers around active nesting colonies, with buffers typically at least 50 feet and established by a qualified biologist in consultation with CDFW.
A blanket restriction limiting all Project ground disturbance to August 15 through October 15 is not necessary where protocol surveys demonstrate that Crotch’s bumble bee is absent or where occupied habitat can be avoided. Similarly, written CDFW approval of the qualified biologist and survey protocol is not necessary because BIO-9 expressly requires compliance with CDFW's applicable survey guidance. If Crotch’s bumble bee is detected and take cannot be avoided, applicable incidental take authorization would be required prior to activities that could result in take.
If Crotch’s bumble bee is detected and take cannot be avoided through implementation of avoidance measures, the Project applicant shall obtain applicable incidental take authorization from CDFW prior to conducting activities that could result in take and shall comply with the terms and conditions of such authorization.
Comment E-7 – Listed and Other Special-Status Plants
Comment E-7:
CDFW states that BIO-3 does not identify the specific protocol to be used for special-status plant surveys and questions whether soils were adequately characterized to support the low potential-to-occur determinations for Boggs Lake hedge-hyssop, Colusa grass, San Joaquin Valley Orcutt grass, and Crampton’s tuctoria. CDFW recommends replacing BIO-3 with substantially expanded requirements for habitat and soil assessment, surveys pursuant to CDFW’s 2018 plant survey protocol, potentially multiple years of surveys, reference-population visits, surveys of entire wetlands including portions on adjacent properties, potential hydrologic assessment, CDFW review and approval, avoidance, applicable CESA/NPPA authorization, and 3:1 habitat compensation for impacts to listed plants.
Response E-7:
The comment is acknowledged. The Draft IS/MND identifies the potential for special-status plants to occur within grassland and seasonal wetland habitats and recognizes that Project activities could result in direct impacts to plants or indirect impacts associated with altered wetland hydrology or introduction of invasive species. BIO-3 requires protocol-level surveys by a qualified botanist for all potentially occurring special-status plant species during the appropriate blooming period before ground disturbance. If special-status plants are identified, BIO-3 requires consultation with CDFW and USFWS, as appropriate, to determine applicable avoidance, mitigation, and permitting requirements.
The City agrees that BIO-3 should identify the applicable survey protocol and will revise the measure to require surveys consistent with CDFW’s 2018 Protocol for Surveying and Evaluating Impacts to Special-Status Native Plant Populations and Sensitive Natural Communities, or subsequent applicable CDFW guidance.
The additional requirements recommended by CDFW, including mandatory multiple-year surveys, surveys of inaccessible portions of adjacent properties, CDFW written approval of survey reports
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 9
before construction, and a predetermined 3:1 compensation ratio for all listed plant impacts are not necessary in every circumstance. The need for additional surveys, hydrologic evaluation, species-specific avoidance, compensation, or regulatory authorization will depend on survey results, final Project design, the nature and extent of any impacts, and the regulatory status of species actually identified. Existing BIO-3 provides for consultation with CDFW and USFWS if special-status plants are identified so that appropriate species- and impact-specific requirements can be implemented.
Comment E-8:
CDFW notes that the Solano County Water Agency (SCWA) 2025 Multispecies Habitat Conservation Plan is not adopted and therefore cannot be verified.
Response E-8:
The comment is acknowledged. The reference for the Solano County Water Agency (SCWA) 2025 Multispecies Habitat Conservation Plan has been removed throughout and replaced with CDFW guidance documents.
Commenter F – Yocha Dehe Wintun Nation
Use identification # YD-03192026-01 [email protected]
Comment F-1:
The Tribe notes that they have reviewed the project and concluded that it is within the aboriginal territories of the Yocha Dehe Wintun Nation. Therefore, we have a cultural interest and authority in the proposed project area and would like to continue to receive updates on the project.
Response F-1:
The comment is acknowledged. The City will continue to provide the Yocha Dehe Wintun Nation with updates as the project moves forward.
INFORMAL PHONE CALL COMMENTS
G -Air Quality BAAQMD
Comment G-1: During an informal phone call on 8/31/26 by Ivy Tao, Bay Area Air District (BAAQMD) staff requested that the air quality and greenhouse gas analyses be updated to include:
1. Incorporate additional stationary sources into the model run (emergency backup generator associated with BESS, 2 ozone generators)
2. AQ impact b: update operational emissions table, add discussion of potential emissions from stationary sources (including ozone from ozone generators)
3. AQ impact c: discuss the potential for TAC emission from the stationary sources, qualitative approach is OK
10/5/26 (P:\2025\20252567.02_West Yost North Regional WTP\PRODUCT\CEQA\Draft\Public Review Draft\Public Comments\Draft Response to Comments_10.01.26.docx) 10
4. GHG impact a: update operational emissions table, add a comparison to the 10,000 MTCO2e/yr threshold applied to stationary sources
Response G-2:
The comments are acknowledged. The air quality and greenhouse gas analyses will be updated to incorporate the identified stationary sources and address the requested operational emissions, TAC, and greenhouse gas considerations. The applicable emissions tables and supporting discussions will be revised accordingly, including comparison of stationary-source greenhouse gas emissions to the applicable 10,000 MTCO2e/year threshold. The updated analysis will be incorporated into the Final IS/MND.
The updated modeling confirms that the revisions do not result in any new significant environmental impacts or a substantial increase in the severity of previously identified impacts, and no new or substantially revised mitigation measures are required. The significance conclusions presented in the Draft IS/MND remain unchanged. Accordingly, the revisions provide additional and clarifying information and do not require recirculation of the IS/MND pursuant to State CEQA Guidelines Section 15073.5.
Agenda Item No: K.4
AGENDA REPORT
DATE: October 20, 2026
TO: Mayor and Council
FROM: David Gassaway, city manager
SUBJECT: Resolution 2026-197 PW Vanden Road Widening Phase 1 Design Authorizing the City Manager to Execute a Professional Services Agreement with Carlson, Barbee & Gibson, Inc. to Provide Engineering Design Services for the Vanden Road Widening Improvements Project (Jepson Parkway Segment 17A, 17B, and 18) Phase 1 Embankment, and Authorizing an Update to the Fiscal Year 2026-2027 Budget and 5-Year Capital Improvement Plan Funding Source: $350,000 ($233,333, Northeast Transportation Fund; $116,667, Capital Street Funds Assembly Bill 1600 Streets Fund)
Contact: Ryan Panganiban, (707) 428-7017
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
Construction of the Vanden Road Widening Improvement Project is planned to be designed and bid in separate phases due to its complexity and traffic impact to existing arterial roadways. The first phase consists of remedial grading for the Union Creek bridge and placement of soil to prepare the embankment for the roadway and future New Canon Road overcrossing. Staff recommend that the City Council authorize the city manager to execute a $164,500 Professional Services Agreement (PSA) with Carlson, Barbee & Gibson, Inc. (CBG) and approve the associated budget amendment within the fiscal year (FY) 2026–2027 Budget. These actions will fund completion of the engineering plans, specifications, and cost estimates for the first phase, allowing it to advance to construction.
DISCUSSION
The cities of Fairfield and Vacaville have been working with Solano County and the Solano Transportation Authority (STA) since 1999 to develop a common vision for a regional alternative to Interstate 80 through eastern Suisun, Fairfield, and Vacaville. STA adopted the concept plan for this roadway, known as Jepson Parkway, in 2000. The planned four to six lane arterials will
provide an efficient alternative to Interstate 80 for local travel and improve connectivity between communities.
The Vanden Road Widening Improvement Project is part of the Jepson Parkway corridor and will widen and realign Vanden Road to accommodate an ultimate roadway configuration of four to six lanes. In 2018, the city completed widening improvements from Peabody Road to approximately 645 feet south of Lake Trail. The next phase extends northeasterly from that point to beyond existing Canon Road and includes approximately 4,650 linear feet of roadway improvements, embankment grading, a new bridge over Union Creek, underground utilities, drainage facilities, sidewalks, streetlights, and intersection improvements. This portion of the corridor is designated as Jepson Parkway Segments 17A, 17B, and 18 (Project) in plans and funding documents.
The Project will be constructed in multiple phases to align with available funding and to minimize traffic impacts on existing arterial roadways. Phase 1 of the Project involves preliminary grading to stabilize the underlying soils and the placement of fill to construct the embankment for the future roadway and the New Canon Road overcrossing of the Union Pacific Railroad. Existing overhead utility poles intersect with the proposed Vanden Road widening and will need to remain in place and be protected during grading until the ground elevations at their designated relocation sites are established. Completing this grading phase will enable Pacific Gas and Electric Company (PG&E) to relocate the utility poles and prepare the corridor for subsequent construction activities.
Staff recommend CBG as the most qualified firm to provide engineering design services for Phase 1 of the Project based on its extensive familiarity with the improvements of Vanden Road. CBG previously prepared the roadway plan lines and initial concept-level design in 2013 and served as the engineer of record for the adjoining segment completed in 2018. This prior experience ensures continuity with previous design work and supports efficient coordination of the proposed grading with utility relocations and subsequent roadway improvements. The proposed PSA with CBG, in the amount of $164,500, will provide engineering design services for the Phase 1 Project, including supplemental surveying, preparation of grading plans, technical specifications, bid documents, and supporting coordination.
Geotechnical studies and remedial grading design are excluded from CBG’s scope of work and will be addressed through a separate agreement with ENGEO. ENGEO is familiar with the Phase 1 Project and has conducted site reconnaissance, laboratory testing, and provided recommendations related to grading, slope stability, retaining walls, and settlement. ENGEO have also delivered 30% design-level remedial grading and ground improvement plans. Staff request an allocation of $100,000 to facilitate negotiations with ENGEO regarding scope of work and fees to update and finalize the necessary geotechnical analyses.
The preliminary construction cost estimate for the Phase 1 Project ranges from $8.2 million to $8.5 million and will be refined as the design progresses. Phase 1 of the Project is identified in the citywide AB1600 and Northeast Specific Plan development impact fee programs. Staff are
developing a funding plan that identifies all Phase 1 Project costs including construction management, testing and inspection, etc. and will return to council at a future date for budget authorization needed before proceeding with construction.
FINANCIAL IMPACT
Total authorization for the engineering design services for the Phase 1 Project is $350,000, which includes the total contract amount with CBG ($164,500) plus an allowance for ENGEO ($100,000) plus a management reserve of $85,500 for unforeseen technical or required work that may arise during completion of the plans, specifications, and engineer’s estimates. Costs will be split between $116,667 Assembly Bill (AB) 1600 Streets (Fund 261) and $233,333 Northeast Transportation (Fund 290).
The Vanden Road Widening Phase 1 Project (CPW070134) was not included in the FY 2026-2027 Capital Budget. Therefore, a budget adjustment is required to authorize a transfer of $116,666.67 from AB 1600 Streets (Fund 261) and $233,333.30 Northeast Transportation (Fund 290) and an increase appropriations to the Street Capital Fund (Fund 252). Sufficient fund balance is available, and no General Fund contribution is required.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The council may choose not to approve the proposed PSA with CBG and the associated budget adjustment. This alternative is not recommended because it would delay completion of the Project Phase 1 grading design and subsequent utility relocations and roadway construction.
The council may choose to direct staff to initiate a separate procurement process to hire a different consultant to complete the required engineering and design for the roadway. However, this is not recommended as pursuing a new consultant contract would result in additional time for solicitation, selection, and contract execution.
COORDINATED WITH
Finance Department
STAFF CONTACT
Ryan Panganiban, Assistant Public Works Director and City Engineer (707) 428-7017
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: Proposed Agreement
Attachment 4: Project Exhibit (Project Limits)
CITY OF FAIRFIELD
RESOLUTION NO. 2026-197
AUTHORIZING THE CITY MANAGER TO EXECUTE A PROFESSIONAL SERVICES AGREEMENT WITH CARLSON, BARBEE & GIBSON, INC. TO PROVIDE ENGINEERING DESIGN SERVICES FOR THE VANDEN ROAD WIDENING IMPROVEMENTS PROJECT (JEPSON PARKWAY 17A, 17B, AND 18) PHASE 1 EMBANKMENT, AND AUTHORIZING AN UPDATE TO THE FISCAL YEAR 2026-2027 BUDGET AND 5-YEAR CAPITAL IMPROVEMENT PLAN
WHEREAS, the Vanden Road Widening Improvement Project is part of the Jepson Parkway corridor and will improve regional connectivity, safety, and access to planned development in northeast Fairfield; and
WHEREAS, the portion of the Vanden Road Widening Improvement Project designated as Jepson Parkway 17A, 17B, and 18 (Project) in plans and funding documents includes approximately 4,650 linear feet of roadway improvements, embankment grading, a new bridge over Union Creek, underground utilities, drainage facilities, sidewalks, streetlights, and intersection improvements; and
WHEREAS, staff has identified a construction sequence beginning with initial grading and embankment work, referred to as the Vanden Road Widening Improvement Project Phase 1 Embankment Project; and
WHEREAS, the city requires outside professional design and technical services to develop and prepare construction-ready documents for the Project; and WHEREAS, Carlson, Barbee & Gibson Inc. (CBG) is qualified to provide professional design and technical services; and
WHEREAS, staff recommend adding the Project (CPW070134) to the 5-year Capital Improvement Plan; and
WHEREAS, geotechnical studies and remedial grading design are excluded from CBG’s scope of work and will be addressed through a separate agreement with ENGEO; and WHEREAS, staff request an allocation of $100,000 to facilitate negotiations with ENGEO regarding scope of work and fees to update and finalize the necessary geotechnical analyses; and WHEREAS, a budget adjustment to transfer $116,667 from AB1600 Streets Fund (Fund 261) and $233,333 Northeast Transportation (Fund 290) to the Capital Streets Fund (Fund 252; CPW070133) is necessary to fund the agreement, geotechnical services, and management reserve; and
RES. NO. 2026-197
WHEREAS, the revised appropriation constitutes an update to the fiscal year (FY) 2026-2027 Budget approved pursuant to Resolution 2026-114.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The city manager is authorized and directed to execute on behalf of the city that certain professional services agreement CBG for engineering and design services for the Project in an amount not-to-exceed $164,500.
Section 2. The city manager is hereby authorized to execute contract amendments for an amount not-to-exceed $85,500.
Section 3. The Vanden Road Widening Improvement Project, Jepson Parkway 17A, 17B, and 18 (CPW070133) are hereby established and added to the 5-Year Capital Improvement Plan and Capital Budget.
Section 4. The City Council hereby approves a budget transfer of $116,666.67 from AB1600 Streets Fund (Fund 261) and $233,333.33 Northeast Transportation (Fund 290) to the Capital Streets Fund (Fund 252; CPW070133) to fund the Project.
Section 5. The council hereby approves an increase in appropriations of $350,000 to the FY 2026-2027 Street Capital Fund (Fund 252) for the Vanden Road Widening Improvement Project, Jepson Parkway 17A, 17B, and 18 (CPW070133).
Section 6. The city manager is authorized to take all actions necessary or appropriate to implement this resolution.
RES. NO. 2026-197
PASSED AND ADOPTED this 20th day of October 2026, by the following vote:
AYES: MEMBERS: VACCARO/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________ _________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
1 Revised 1/09/2025
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT is made at Fairfield, California, as of ___________, 20_ _ __, by and between the City of Fairfield, a municipal corporation (the “CITY") and Carlson, Barbee & Gibson, Inc. (CBG) ("CONSULTANT"), who agree as follows:
1) SERVICES. Subject to the terms and conditions set forth in this Agreement, CONSULTANT shall provide to the CITY the services described in Exhibit “A,” which consists of the proposal submitted by CONSULTANT. CONSULTANT shall provide said services at the time, place, and in the manner specified in Exhibit “A.”
2) PAYMENT. CITY shall pay CONSULTANT for services rendered pursuant to this Agreement at the times and in the manner set forth in Exhibit “B.” The payments specified in Exhibit “B” shall be the only payments to be made to CONSULTANT for services rendered pursuant to this Agreement.
CONSULTANT shall submit all billings for said services to the CITY in the manner specified in Exhibit “B.” 3) FACILITIES AND EQUIPMENT. CONSULTANT shall, at its sole cost and expense, furnish all facilities and equipment which may be required for furnishing services pursuant to this Agreement. 4) GENERAL PROVISIONS. The general provisions set forth in Exhibit “C” are part of this Agreement. In the event of any inconsistency between said general provisions and any other terms or conditions of this Agreement, the provisions set forth in Exhibit “C” shall control. 5) INSURANCE REQUIREMENTS. The insurance requirements set forth in Exhibit “D” are part of this Agreement. In the event of any inconsistency between said general provisions and any other terms or conditions of this Agreement, the requirements set forth in Exhibit “D” shall control. 6) BUSINESS LICENSE. The CONSULTANT shall obtain and keep current a business license for work within the City of Fairfield pursuant to Chapter 10B of the Fairfield City Code, with respect to the gross receipts received pursuant to this Agreement. No payments shall be made to any SERVICE PROVIDER until such business license has been obtained, and all fees paid therefore, by the CONSULTANT. Business license applications and information may be obtained from the Community Development Department, Fairfield City Hall, 1000 Webster Street, Fairfield, CA 94533-4883, (707-428- 7509) and online at www.fairfield.ca.gov/biz.
7) EXHIBITS. All exhibits referred to herein are attached hereto and are by this reference incorporated herein.
8) TERM. This agreement shall be in effect through December 31, 2027. 9) GOVERNING LAW AND VENUE. Should either Party to this Agreement bring legal action against the other, the validity, interpretation, and performance of this Contract shall be controlled by and construed under the laws of California, excluding California’s choice of law rules. Venue for any such action relating to this Agreement shall be in the Solano County Superior Court. 10) Where applicable, vehicles with a GVWR greater than 8,500 lbs. and light-duty package delivery vehicles operated in California may be subject to the California Air Resources Board Advanced Clean Fleets regulations. Such vehicles may therefore be subject to requirements to reduce emissions of
2 Revised 1/09/2025
air pollutants. For more information, please visit the CARB Advanced Clean Fleets webpage at https://ww2.arb.ca.gov/our-work/programs/advanced-clean-fleets 11) ENTIRE AGREEMENT. This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between CITY and CONSULTANT.
This Agreement supersedes all prior oral or written negotiations, representations or agreements. This Agreement may not be modified or amended, nor any provision or breach waived, except in a writing signed by both parties which expressly refers to this Agreement. 12) COUNTERPARTS. This Agreement may be executed in counterpart originals, duplicate originals, or both, each of which is deemed to be an original for all purposes. 13) NOTICES. This Agreement is managed and administered on the CITY’s behalf by the individual named below. All invoices must be submitted and approved by this individual and all notices shall be given to the CITY using the following contact information:
CITY Contact: Ryan Panganiban
E-mail: [email protected]
Address: 1000 Webster Street, Fairfield CA 94533
Telephone: (707) 428-7017
Notices must be given to CONSULTANT at the following:
CONSULTANT Contact: Jason Vogan
E-mail: [email protected]
Address: 2633 Camino Ramon, Suite 350, San Ramon, CA 94583 Telephone: (925) 866-0322
EXECUTED as of the day first above-stated.
City of Fairfield, a municipal corporation
By:__________________________________
CONSULTANT, Carlson, Barbee & Gibson, Inc. (CBG)
By:___________________________________
2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com
CIVIL ENGINEERS I SURVEYORS I PLANNERS
P:\1600 - 1699\1668-032\Proposals\Prop Embankment Phase 1 Grading Design Rev.docx June 30, 2026
Job No.: 1668-032
Revised August 20, 2026
Proposal to Provide
Civil Engineering Services
Jepson Parkway Embankment Phase 1 Grading Plans
Segments 17A, 17B and 18 (3,300 LF±)
Fairfield Train Station Specific Plan
Fairfield, California
Description of Work
I. Survey
A. Supplemental Aerial Topography
1. Perform a 1”=20’ scale, one-foot contour interval aerial topographic survey of the area between Lake Trail and Union Creek and surrounding areas to capture current site conditions. Associated fee is time and materials not to exceed.
B. Supplemental Field Survey
1. Perform a field survey of conform, utility tie-ins, etc. to supplement the aerial topography as needed for the design process.
II. Construction Documents
A. Grading Plans
1. Prepare 1”=40’ scale Grading Plan in accordance with City of Fairfield requirements for the Jepson Parkway Embankment Phase 1 Grading project (Segments 17A, 17B, and 18). Phase 1 Grading will include grading from existing Planning Area 5 and DWR access roads to the northern end of Segment 18. Design assumes grading will not encroach into existing Vanden Roadway or DWR corridor. This plan set will include the following:
a. Cover Sheet / General Notes / Sections / Details
b. Horizontal Control Plan
c. Staging and Traffic Handling Plan
d. Demolition Plan
e. Typical Sections
f. Rough Grading Plan
g. Retaining Wall Plan (by subconsultant DPAE Structural) DXHIAIT@
Jepson Parkway Embankment Phase 1 Grading Plans June 30, 2026
Revised August 20, 2026
Description of Work
P:\1600 - 1699\1668-032\Proposals\Prop Embankment Phase 1 Grading Design Rev.docx h. Erosion Control Plan
i. Remedial Grading Plans (Design by others under separate contract direct with City)
III. Additional Engineering Services
A. Bid Schedule
1. Prepare a Quantity Estimate to be used as a bid schedule for construction bidding.
2. Update Quantity Estimate based upon the approved Construction Plans.
B. Consultant Coordination
1. Assist Client with coordination of files and submittals for the Consultant Team.
C. Remedial Grading Plan Coordination
1. Coordinate with Geotechnical Engineer (under separate contract directly with City) on remedial grading plan. Incorporate remedial grading plan into plan set.
D. Technical Specifications
1. Prepare technical specifications in accordance with City of Fairfield requirements.
E. Legal Descriptions and Plat Maps (Assume 3)
1. Prepare legal descriptions and plats maps for inclusion in agreements and/or grant deeds. Address review comments as necessary.
F. Storm Water Pollution Prevention Plan (SWPPP)
1. Prepare a Risk Assessment in accordance with the State Water Quality Control Board (SWQCB) requirements.
2. Prepare a Storm Water Pollution Prevention Plan (SWPPP) for the Project.
Jepson Parkway Embankment Phase 1 Grading Plans June 30, 2026
Revised August 20, 2026
Description of Work
P:\1600 - 1699\1668-032\Proposals\Prop Embankment Phase 1 Grading Design Rev.docx
3. Upload the SWPPP and other permit registration documents to the SMARTS website.
4. Respond to any SWQCB comments and revise and resubmit as required.
Time is of the essence for permit uploading and will not be delayed. City will not pay any additional fees for SWPPP iterations or resubmittals unless the changes are directly requested by the City or result from an error by the City. City is responsible for Registering on SMARTS website as Legally Responsible Person and finalizing permit.
G. Miscellaneous Tasks and Exhibits
1. Perform miscellaneous tasks and prepare miscellaneous exhibits as requested by Client.
H. Meetings and Teleconferences
1. Attend meetings and participate in teleconferences as requested by Client.
I. Plan Revisions
1. Prepare plan revisions as requested by Client to incorporate plan changes required during the construction phase of the project. Plan revisions will be completed on a time and materials basis so the associated fee is a budget that will not be exceeded without prior Client approval.
J. Record Drawings
1. Prepare one set of record drawings inclusive of any revisions to plans approved during construction and any documented field markups provided by Construction Manager. Revisions and field markups will be incorporated at no additional cost to City as all revisions are compensated under Item
3.I.1.
Jepson Parkway Embankment Phase 1 Grading Plans June 30, 2026
Revised August 20, 2026
Description of Work
P:\1600 - 1699\1668-032\Proposals\Prop Embankment Phase 1 Grading Design Rev.docx ,9 Reimbursables (Require Prior City Approval)
$ Printing and Large Scale Mylar/Bond Plots.
% Delivery Services and UPS.
& Acquisition of Record Materials.
' Mileage, Tolls, and Parking.
9 Assumptions
$ All fees will be charged per the attached Standard Hourly Charge Rate Schedule, which is in effect through June 30, 2027.
% Per Client direction it is assumed the Kinder Morgan 20-inch fuel line will remain in place during and after construction. Carlson, Barbee and Gibson, Inc. (CBG) has not been retained to evaluate or analyze any potential impacts to pipeline as a result of proposed construction or post construction conditions. CBG is relying on pipeline information provided by others and is not verifying physical location (other than surface features or markings identified as part of Task I.B.1) or condition.
Client is responsible for retaining any necessary qualified experts to provide recommendations to mitigate any potential impacts to pipeline as a result of project and shall diligently implement said recommendations. Client is responsible for all required communication with Kinder Morgan and obtaining any and all required permits, permissions, and approvals from Kinder Morgan and any applicable governing bodies with jurisdiction over pipeline. CBG is not responsible for contractor means and methods or construction activities affecting the pipeline.
Client shall indemnify CBG from any and all claims related to the Kinder Morgan fuel line as a result of construction of the proposed scope of work. & Grading Plans are consistent with the Jepson Parkway – SegmentV 17A, 17B & 183KDVH,PSURYHPHQW3ODQVE\&%*GDWHG-XQH
' Plans will be formatted to Caltrans standards to allow for traditional design-bid-build process to be administered by Client. ( Client will pay all agency fees and allow access to property. ) Client will provide a current Title Report and all other applicable studies and reports.
Jepson Parkway Embankment Phase 1 Grading Plans June 30, 2026
Revised August 20, 2026
Description of Work
P:\1600 - 1699\1668-032\Proposals\Prop Embankment Phase 1 Grading Design Rev.docx G. Client will retain qualified geotechnical engineer to prepare design level geotechnical report, remedial grading plans, and conduct quality control and quality assurance testing and inspection as necessary.
H. Client will retain a qualified Construction Manager that will oversee all aspects of project construction administration including bid clarifications, requests for information, change orders, quantity measurements, progress payments, and project acceptance.
VI. Exclusions
A. Design of any improvements not specifically included. Design of New Canon Roadway including crossing of UPRR. Design of DWR crossing. Utility extensions outside of roadway alignment including water and sewer extensions to planned industrial projects. Reconstruction of Old Canon Road culverts at Union Creek.
B. Scope of work assumes that the following consultants will be contracted directly with Client and are not included in this proposal:
1. Geotechnical Engineer
C. Design, analysis, evaluation, monitoring, coordination, communication, permitting, and approvals related to 20-inch Kinder Morgan fuel line. Incorporation or implementation of any proposed mitigation measures recommended by others related to 20-inch Kinder Morgan fuel line.
D. Services not specifically included in the scope of work.
E. Construction Staking / Construction Management.
F. Aerial Topography, Boundary Survey, ALTA Survey, Record of Survey.
G. Monument preservation.
H. Potholing of existing underground facilities.
I. Architectural concepts, streetscapes, elevations, and landscape plans.
J. Fish & Game, Fish & Wildlife, and Army Corps of Engineers and/or Regional Water Quality Control Board approvals and permitting.
K. Traffic, soils, hazardous materials, arborists, archaeological or biological reports.
2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com
CIVIL ENGINEERS I SURVEYORS I PLANNERS
June 30, 2026
Job No.: 1668-032
Revised August 20, 2026
Description of Work Estimated Fee
I. Survey
A. Supplemental Aerial Topography 5,000 $ (T&M)
B. Supplemental Field Survey 4,500 $ (T&M)
II. Construction Drawings
A. Grading Plans 55,000 $
III. Additional Engineering Services
A. Bid Schedule 4,000 $
B. Consultant Coordination 10,000 $ (T&M)
C. Remedial Grading Plan Coordination 7,500 $ (T&M)
D. Technical Specifications 10,000 $
E. Legal Description and Plat Maps (Assume 3) $ 7,500
F. Storm Water Pollution Prevention Plan (SWPPP) $ 6,000 G. Miscellaneous Tasks and Exhibits 15,000 $ (T&M)
H. Meetings and Teleconferences 15,000 $ (T&M)
I. Plan Revisions 15,000 $ (T&M)
J. Record Drawings 8,000 $
IV. Reimbursables 2,000 $
Total 164,500 $
Fees will be charged per the attached Standard Hourly Charge Rate Schedule, which is in effect through June 30, 2027.
Fee Summary
Jepson Parkway Embankment Phase 1 Grading Plans
Segments 17A, 17B and 18 (3,300LF)
Fairfield Train Station Specific Plan
Fairfield, California
\\dl2023a\P-Drive\1600 - 1699\1668-032\Proposals\Summ Embankment Phase 1 Grading Design Rev.xlsx
DXHIAITA
P:\0000\Engineering\Rate Schedule\archive\Rate Schd_June 2027.docx
STANDARD HOURLY CHARGE RATE SCHEDULE
Effective through June 30, 2027
Engineering
Project Manager ........................................................................ $280 Senior Engineer................................................................... $245 - $260 Project Engineer .................................................................. $220 - $240 Staff Engineer...................................................................... $195 - $215 Assistant Engineer .............................................................. $160 - $180 Planning
Senior Planner ..................................................................... $2- $26 Surveying
Survey Manager ............................................................................. $280 Senior Surveyor .................................................................. $245 - $260 Project Surveyor.................................................................. $220 - $240 Staff Surveyor ..................................................................... $195 - $215 Assistant Surveyor .............................................................. $160 - $180 Party Chief .................................................................................. $230 Chainman ................................................................................... $130 Drafting
CAD Technician ......................................................................... $160 Administration
Clerical $100
Reimbursables ................................................................. Cost + 10% Management
Principal ..................................................................................... $305 Associate .................................................................................... $290 2633 CAMINO RAMON, SUITE 350 I SAN RAMON, CALIFORNIA 94583 I (925) 866-0322 1430 BLUE OAKS BOULEVARD, SUITE 110 I ROSEVILLE, CALIFORNIA 95747 I (916) 788-4456 www.cbandg.com
CIVIL ENGINEERS I SURVEYORS I PLANNERS
5 Revised 1/09/2025
EXHIBIT “C”
GENERAL PROVISIONS
1) INDEPENDENT CONSULTANT. At all times during the term of this Agreement, CONSULTANT shall be an independent contractor and shall not be an employee of CITY. CITY shall have the right to control CONSULTANT only insofar as the results of CONSULTANT's services rendered pursuant to this Agreement; however, CITY shall not have the right to control the means by which CONSULTANT accomplishes services rendered pursuant to this Agreement. 2) LICENSES; PERMITS; ETC. CONSULTANT represents and warrants to CITY that CONSULTANT has all licenses, permits, qualifications, and approvals of whatsoever nature which are legally required for CONSULTANT to practice CONSULTANT's profession. CONSULTANT represents and warrants to CITY that CONSULTANT shall, at its sole cost and expense, keep in effect at all times during the term of this Agreement, any licenses, permits, and approvals which are legally required for CONSULTANT to practice his profession.
3) TIME. CONSULTANT shall devote such services pursuant to this Agreement as may be reasonably necessary for satisfactory performance of CONSULTANT's obligations pursuant to this Agreement. CONSULTANT shall adhere to the Schedule of Activities as described in their Executive Summary.
4) CONSULTANT NOT AN AGENT. Except as CITY may specify in writing, CONSULTANT shall have no authority, express or implied, to act on behalf of CITY in any capacity whatsoever as an agent.
CONSULTANT shall have no authority, express or implied, pursuant to this Agreement, to bind CITY to any obligation whatsoever.
5) ASSIGNMENT PROHIBITED. No party to this Agreement may assign any right or obligation pursuant to this Agreement. Any attempted or purported assignment of any right or obligation pursuant to this Agreement shall be void and of no effect.
6) PERSONNEL. CONSULTANT shall assign only competent personnel to perform services pursuant to this Agreement. In the event that CITY, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by CONSULTANT to perform services pursuant to this Agreement, CONSULTANT shall remove any such person immediately upon receiving notice from CITY of the desire of CITY for the removal of such person or persons. 7) STANDARD OF PERFORMANCE. CONSULTANT shall perform all services required pursuant to this Agreement. Services shall be performed in the manner and according to the standards observed by a competent practitioner of the profession in which CONSULTANT is engaged in the geographical area in which CONSULTANT practices his profession. All products which CONSULTANT delivers to CITY pursuant to this Agreement shall be prepared in a workmanlike manner, and conform to the standards of quality normally observed by a person practicing in CONSULTANT's profession. CITY shall be the sole judge as to whether the product of the CONSULTANT is satisfactory.
8) CANCELLATION OF AGREEMENT. This Agreement may be canceled at any time by the CITY at its discretion upon written notification to CONSULTANT. CONSULTANT is entitled to receive full payment for all services performed and all costs incurred up to and including the date of receipt of written notice
6 Revised 1/09/2025
to cease work on the project. CONSULTANT shall be entitled to no further compensation for work performed after the date of receipt of written notice to cease work. All completed and incomplete products up to the date of receipt of written notice to cease work shall become the property of CITY. 9) PRODUCTS OF CONSULTING. All products of the CONSULTANT provided under this Agreement shall be the property of the CITY.
10) INDEMNIFY AND HOLD HARMLESS.
a) If AGREEMENT is an agreement for design professional services subject to California Civil Code § 2782.8(a) and CONSULTANT is a design professional, as defined in California Civil Code § 2782.8(c)(2), to the fullest extent permitted by law, CONSULTANT shall indemnify, defend and hold harmless CITY and its elected officials, officers, agents, employees and designated volunteers (collectively “CITY Indemnitees”) from and against any and all claims, losses, liabilities, damages, costs and expenses, including attorney’s fees and costs, to the extent they arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the CONSULTANT. CONSULTANT’s duty to defend shall consist of reimbursement of defense costs incurred by CITY in direct proportion to the CONSULTANT’s proportionate percentage of fault. CONSULTANT’s percentage of fault shall be determined, as applicable, by a court of law, jury or arbitrator. In the event any loss, liability or damage is incurred by way of settlement or resolution without a court, jury or arbitrator having made a determination of the CONSULTANT’s percentage of fault, the parties agree to mediation with a third party neutral to determine the CONSULTANT’s proportionate percentage of fault for purposes of determining the amount of indemnity and defense cost reimbursement owed to the CITY.
b) If AGREEMENT is not an agreement for design professional services subject to California Civil Code § 2782.8(a) or CONSULTANT is not a design professional as defined in California Civil Code § 2782.8(c)(2), to the fullest extent allowed by law, CONSULTANT shall indemnify, defend, and hold harmless the CITY Indemnitees from all claims, suits, or actions of every name, kind and description, brought forth on account of injuries to or death of any person or damage to property arising from or connected with the willful misconduct, negligent acts, errors or omissions, ultra-hazardous activities, activities giving rise to strict liability, or defects in design by CONSULTANT or any person directly or indirectly employed by or acting as agent for CONSULTANT in the performance of this Agreement, including the concurrent or successive passive negligence of the CITY Indemnitees.
It is understood that the duty of CONSULTANT to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code.
Acceptance of insurance certificates and endorsements required under this Agreement does not relieve CONSULTANT from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply whether or not such insurance policies are determined to be applicable to any such damages or claims for damages.
CONSULTANT’S responsibility for such defense and indemnity shall survive termination or completion of this agreement for the full period of time allowed by law. 11) PROHIBITED INTERESTS. No employee of the CITY shall have any direct financial interest in this agreement. This agreement shall be voidable at the option of the CITY if this provision is violated.
7 Revised 1/09/2025
12) LOCAL EMPLOYMENT POLICY. The CITY desires wherever possible, to hire qualified local residents to work on city projects. Local resident is defined as a person who resides in Solano County.
The CITY encourages an active affirmative action program on the part of its contractors, consultants, and developers. When local projects require, subcontractors, contractors, consultants and developers will solicit proposals from qualified local firms where possible.
As a way of responding to the provisions of the Davis-Bacon Act and this program, contractor, consultants, and developers will be asked, to provide no more frequently than monthly, a report which lists the employee's name, job class, hours worked, salary paid, city of residence, and ethnic origin. 13) CONSULTANT NOT A PUBLIC OFFICIAL. CONSULTANT is not a "public official" for purposes of Government Code §§ 87200 et seq. CONSULTANT conducts research and arrives at his or her conclusions, advice, recommendation, or counsel independent of the control and direction of the CITY or any CITY official, other than normal contract monitoring. In addition, CONSULTANT possesses no authority with respect to any CITY decision beyond these conclusions, advice, recommendation, or counsel. 14) EMPLOYMENT DEVELOPMENT DEPARTMENT REPORTING REQUIREMENTS. When the CITY executes an agreement for or makes payment to CONSULTANT in the amount of $600 (six hundred dollars) or more in any one calendar year, CONSULTANT shall provide the following information to CITY to comply with Employment Development Department (EDD) reporting requirements:
a) Whether CONSULTANT is doing business as a sole proprietorship, partnership, limited liability partnership, corporation, limited liability corporation, non-profit corporation or other form of organization.
b) If CONSULTANT is doing business as a sole proprietorship, CONSULTANT shall provide the full name, address and social security number of the sole proprietor. c) If CONSULTANT is doing business as other than a sole proprietorship, CONSULTANT shall provide CONSULTANT’S federal tax identification number.
8 Revised 1/09/2025
EXHIBIT “D”
INSURANCE REQUIREMENTS
CONSULTANT shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the CONSULTANT, its agents, representatives, or employees. 1) MINIMUM SCOPE AND LIMITS OF INSURANCE
a) Commercial General Liability coverage (occurrence Form CG 00 01) with minimum limits of $1,000,000 per occurrence for bodily injury, personal injury, products and completed operations, and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b) Automobile Liability coverage (Form CA 00 01 with Code 1 – any auto) with minimum limits of $1,000,000 per accident for bodily injury and property damage. c) Workers’ Compensation insurance as required by the State of California and Employers’ Liability insurance, each in the amount of $1,000,000 per accident for bodily injury or disease. 2) INDUSTRY SPECIFIC COVERAGES
If checked below, the following insurance is also required.
Professional Liability Insurance / Errors and Omissions Liability in the minimum amount of $1,000,000 per occurrence.
Pollution Liability Insurance in the minimum amount of $1,000,000 per occurrence Garage Keepers Insurance in the minimum amount of $1,000,000 per occurrence Fidelity / Crime / Dishonesty Bond in the minimum amount of $____________ MCS-90 Endorsement to Business Automobile insurance for transportation of hazardous materials and pollutants
Builder’s Risk / Course of Construction Insurance in the minimum amount of $__________. 3) INSURANCE PROVISIONS
a) DEDUCTIBLES AND SELF-INSURED RETENTIONS. Any deductibles or self-insured retentions must be declared to and approved by the CITY. At the option of the CITY, either the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the CITY, its officers, officials, employees and volunteers; or the CONSULTANT shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. b) The general and automobile liability policies (and if applicable, pollution liability, garage keepers X
9 Revised 1/09/2025
liability and builder’s risk policies) are to contain, or be endorsed to contain, the following provisions:
i) The CITY, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of work or operations performed by or on behalf of the CONSULTANT; products and completed operations of the CONSULTANT; premises owned, occupied or used by the CONSULTANT; and automobiles owned, leased, hired or borrowed by the CONSULTANT. The coverage shall contain no special limitations on the scope of protection afforded to the CITY, its officers, officials, employees or volunteers. ii) For any claims related to this project, the CONSULTANT’S insurance coverage shall be primary insurance as respects the CITY, its officers, officials, employees and volunteers. Any insurance or self-insured maintained by the CITY, its officers, officials, employees or volunteers shall be in excess of the CONSULTANT’S insurance and shall not contribute with it. iii) Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the CITY, its officers, officials, employees or volunteers.
iv) The CONSULTANT’S insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability. v) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days’ prior written notice by certified mail, return receipt requested, has been given to the CITY.
vi) The policy limits of coverage shall be made available to the full limits of the policy. The minimum limits stated above shall not serve to reduce the CONSULTANT’S policy limits of coverage.
Therefore, the requirements for coverage and limits shall be (1) the minimum coverage and limits specified in this agreement, or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured, whichever is greater. c) ACCEPTABILITY OF INSURER. Insurance is to be placed with insurers with a current A.M. Best’s rating of no less than A:VII, unless otherwise acceptable to the CITY.
VERIFICATION OF COVERAGE. CONSULTANT shall furnish the CITY with original endorsements effecting coverage required by this Exhibit D. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf; on forms equivalent to CG 20 10 11 85, subject to CITY approval; and submitted electronically via email at [email protected]. All insurance certificates and endorsements are to be received and approved by the CITY before work commences. At the request of the CITY, CONSULTANT shall provide complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications. d) SUB-CONTRACTORS. CONSULTANT shall require all subcontractors to procure and maintain insurance policies subject to the requirements of Exhibit D. Failure of CONSULTANT to verify existence of sub-contractor’s insurance shall not relieve CONSULTANT from any claim arising from sub-contractors work on behalf of CONSULTANT.
Vanden Road Widening
Improvements Project
Agenda Item No: K.5
AGENDA REPORT
DATE: October 20, 2026
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2026-198 PW Fiscal Year 2025-2026 Low Carbon Transit Operations Program Grant Allocation Acceptance
Authorizing the Acceptance of the Fiscal Year 2025-2026 Low Carbon Transit Operations Program Cycle A and Cycle B Grant Allocations from the Greenhouse Gas Reduction Fund for the City of Fairfield Corporation Yard Transit Electrification Project – Phase 1B Funding Source: N/A
Contact: Melissa Minton, (707) 434-3804
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
The City will receive approximately $604,161 from Senate Bill (SB) 862 funding through Cycle A and Cycle B of the Low Carbon Transit Operations Program (LCTOP). This resolution authorizes the submittal of the grant allocation requests for the City of Fairfield Corporation Yard Transit Electrification Project – Phase 1B (Project) and approves the acceptance of the fiscal year (FY) 2025-2026 LCTOP grant funds.
DISCUSSION
LCTOP is one of several programs that are part of the Transit, Affordable Housing, and Sustainable Communities Program established by the California Legislature in 2014 by SB 862. LCTOP was created to provide operating and capital assistance for transit agencies to reduce greenhouse gas emissions and improve mobility. The Cap-and-Trade program is a key element of California’s strategy to reduce greenhouse gas emissions. Five percent of Cap-and-Trade auction proceeds from the prior calendar year have funded LCTOP through the State’s Greenhouse Gas Reduction Fund.
Under SB 840, LCTOP funding will be based on Cap-and-Trade proceeds from the prior FY instead of calendar year beginning in FY 2026-2027. As SB 840 changes take effect midway through LCTOP’s regular cycle, the FY 2025-2026 LCTOP program has been split into two request cycles.
The City has been allocated $26,237 in revenue-based funding and $199,031 in population-based funding for Cycle A LCTOP grant funds for FY 2025-2026. The City has also been allocated $16,810 in revenue-based funding and $99,460 in population-based funding for Cycle B LCTOP grant funds for FY 2025-2026.
The City of Vacaville has also been allocated LCTOP funding but does not have an identified LCTOP project. To ensure its LCTOP funding is used for a project in Solano County, the City of Vacaville has chosen to swap $174,674 of its Cyle A LCTOP grant funds for FY 2025-2026 ($4,696 in revenue-based funding and $169,978 in population-based funding) and $87,949 of its Cycle B LCTOP grant funds for FY 2025-2026 ($3,008 in revenue-based funding and $84,941 in population-based funding) for an equal amount of the City of Fairfield’s Transportation Development Act funds. This will allow both agencies to advance their projects.
FAST intends to rollover the LCTOP funds for four years beginning FY 2023-2024. Accumulating these funds for four years will allow FAST to use the monies to supplement funding and construction of electrical infrastructure upgrades at the City’s Corporation Yard. Construction of these new proposed improvements over the next few years allows FAST to make progress towards meeting the California Air Resource Board’s Innovative Clean Transit regulation requiring all transit fleets be converted to zero-emission by 2040.
FINANCIAL IMPACT
FAST anticipates receiving a total of $604,161 in LCTOP funding for the Project. This funding requires no local match and no financial resources from the City’s General Fund will be used for FAST expenses. All operating and capital expenses for FAST are supported with local, state, and federal transportation grant funds.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The City Council may choose not to claim the $604,161 in LCTOP funding for the design and construction of the Project. This is not recommended, however, as unclaimed funding will be reallocated by the Solano Transportation Authority and Metropolitan Transportation Commission to other transportation agencies, resulting in FAST needing to obtain additional funding to support the transition of the transit fleet.
COORDINATED WITH
N/A
STAFF CONTACT
Melissa Minton, Transportation Planner
(707) 434-3804
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
CITY OF FAIRFIELD
RESOLUTION NO. 2026-198
AUTHORIZING THE ACCEPTANCE OF THE FISCAL YEAR 2025-2026 LOW CARBON TRANSIT
OPERATIONS PROGRAM CYCLE A AND CYCLE B GRANT ALLOCATIONS FROM THE
GREENHOUSE GAS REDUCTION FUND FOR THE CITY OF FAIRFIELD CORPORATION YARD TRANSIT ELECTRIFICATION PROJECT – PHASE 1B
WHEREAS, the Low Carbon Transit Operations Program (LCTOP), being one of the programs established in the Transit, Affordable Housing, and Sustainable Communities Program established by Senate Bill (SB) 862 in 2014, will draw funds from the Greenhouse Gas Reduction Fund for operational and capital improvements; and
WHEREAS, the statutes related to state-funded transit projects require a local or regional implementing agency to abide by various regulations; and WHEREAS, the City of Fairfield was allocated a total of $604,161 in Cycle A and Cycle B LCTOP funds for fiscal year (FY) 2025-2026 for transit operating and capital projects and will hold these funds for up to four years; and
WHEREAS, SB 862 named the State of California Department of Transportation as the administrative agency for LCTOP; and
WHEREAS, the City wishes to implement the City of Fairfield Corporation Yard Transit Electrification Project – Phase 1B.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The City of Fairfield as the fund recipient agrees to comply with all conditions and requirements set forth in the applicable statues, regulations, and guidelines for LCTOP funded transit projects.
Section 2. The City of Fairfield hereby authorizes the submittal of the following project nomination and allocation request to the California Department of Transportation Cycle A and Cycle B FY 2025-2026 LCTOP funds:
Project Name: City of Fairfield Corporation Yard Transit Electrification Project – Phase 1B
Amount of LCTOP funds requested: $604,161
Project Description: Fund the construction of electrical infrastructure upgrade at the City’s
Corporation Yard
Contributing Sponsors: Metropolitan Transportation Commission, Solano Transportation Authority
RES. NO. 2026-198
Section 3. The city manager, public works director, transportation manager or designee are authorized to execute all required documents of the LCTOP program and any amendments thereto with the California Department of Transportation.
PASSED AND ADOPTED this 20th day of October 2026, by the following vote:
AYES: MEMBERS: VACCARO/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________ _________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
Agenda Item No: K.6
AGENDA REPORT
DATE: October 20, 2026
TO: Mayor and Council
FROM: David Gassaway, City Manager
SUBJECT: Resolution 2026-199 PW Amendment No. 1 to the Routing Company Technology Software-as-a-Service Agreement
Authorizing the City Manager to Execute Amendment No. 1 to the Technology Software-as-a-Service Agreement for On-Demand (Microtransit) and In-Advance (Paratransit) Scheduling, Dispatch, and Management Software between the City of Fairfield and the Routing Company Funding Source: $85,000; Transit FAST Connect/FAST Connect Americans with Disabilities Act Fund
Contact: Melissa Minton, (707) 434-3804
RECOMMENDED ACTION
Adopt resolution.
STATEMENT OF ISSUE
On October 18, 2022, the City Council adopted Resolution No. 2022-276 approving a Technology Software-as-a-Service (SaaS) Agreement for On-Demand (Microtransit) and In-Advance (Paratransit) Scheduling, Dispatch, and Management Software between the City of Fairfield and the Routing Company for a total amount not-to-exceed $372,991. The attached resolution authorizes an amendment to increase the SaaS agreement by $85,000 for a total amount not to exceed $457,991.
DISCUSSION
On September 6, 2022, the council authorized FAST to move forward with recommendations outlined in the FAST Forward Comprehensive Operational Analysis (COA) plan to support FAST in becoming a highly functioning and sustainable transit network post-pandemic. The COA included a recommendation to establish two new microtransit zones in replacement of two fixed routes with consistently low ridership and identified the need for a technology partner to help implement and manage the microtransit service.
By Resolution No. 2022-276, the council approved a SaaS Agreement between the City and the Routing Company to provide a software service called Ride Pingo to schedule, dispatch, and manage the City’s comingled microtransit and paratransit services, FAST Connect/FAST Connect Americans with Disabilities Act (ADA), which began its official operations on September 5, 2023.
To familiarize paratransit riders with the new software system and ensure a smooth transition to comingled microtransit and paratransit services using this new software, FAST began operating its paratransit services through Ride Pingo in July 2023. Services provided during this time were outside of the initial scope of work identified within the SaaS Agreement and were not included in the overall SaaS Agreement proposal pricing.
In addition, the firm fixed price under the SaaS agreement only included seven vehicles for the term of the agreement. To meet increased ridership demands and maintain the objective of keeping rider wait times within a 15-minute window, FAST made a total of 15 vehicles available for service during peak service times at $500 per vehicle. Additional hardware installation was required for each vehicle, as well. These additional costs were also not included in the SaaS Agreement pricing.
Due to these unanticipated expenses, an amendment to increase the SaaS Agreement by $85,000 for a total not-to-exceed amount of $457,991 is needed to support continued operationsthrough June 2027. FAST staff intend to initiate a competitive procurement process and return to the council with a new contract in Spring 2027.
FINANCIAL IMPACT
Amendment No. 1 to the SaaS Agreement will increase the total contract amount by $85,000 for a not-to-exceed amount of $457,991. Funds will be paid for by Transportation Development Act funds. This item has no impact on the General Fund.
PUBLIC CONTACT/ADVISORY BODY RECOMMENDATION
N/A
ALTERNATIVE ACTION
The council may choose not to approve the amendment to the SaaS Agreement. This is not recommended, however, as FAST will be unable to continue providing on demand microtransit and paratransit services until an open procurement is conducted in early 2027 and a new SaaS Agreement is approved for execution.
COORDINATED WITH
N/A
STAFF CONTACT
Melissa Minton, Transportation Planner
(707) 434-3804
[email protected]
ATTACHMENTS
Attachment 2: Proposed Resolution
Attachment 3: Proposed Amendment
CITY OF FAIRFIELD
RESOLUTION NO. 2026-199
AUTHORIZING THE CITY MANAGER TO EXECUTE AMENDMENT NO. 1 TO THE TECHNOLOGY
SOFTWARE-AS-A-SERVICE AGREEMENT FOR ON-DEMAND (MICROTRANSIT) AND IN-ADVANCE (PARATRANSIT) SCHEDULING, DISPATCH, AND MANAGEMENT SOFTWARE BETWEEN THE CITY
OF FAIRFIELD AND THE ROUTING COMPANY
WHEREAS, the FAST Forward Comprehensive Analysis (COA) recommended establishing new microtransit zones and identifying a new technology partner for microtransit service and complimentary Americans with Disabilities (ADA) paratransit services; and WHEREAS, the City Council authorized the execution of a Technology Software-as-a-Service (SaaS) Agreement for On-Demand (Microtransit) and In-Advance (Paratransit) Scheduling, Dispatch, and Management software between the City of Fairfield and the Routing Company for a total amount not-to-exceed $372,991 on October 18, 2022; and WHEREAS, FAST began operating FAST Connect and FAST Connect Americans with Disabilities Act (ADA) services on September 6, 2023; and
WHEREAS, due to unanticipated expenses, an increase to the total contract amount is necessary to continue scheduling, dispatching, and managing FAST’s microtransit and paratransit services.
NOW, THEREFORE, THE COUNCIL OF THE CITY OF FAIRFIELD HEREBY RESOLVES:
Section 1. The city manager is hereby authorized to execute Amendment No. 1 to the SaaS Agreement with the Routing Company in the amount of $85,000 for a total amount not-to-exceed $457,991.
Section 2. The city manager or designee is hereby authorized to do all things necessary to implement the above-mentioned agreement.
RES. NO. 2026-199
PASSED AND ADOPTED this 20th day of October 2026, by the following vote:
AYES: MEMBERS: VACCARO/BERTANI/CARR/PANDURO/SANDHU/TONNESEN/WILLIAMS NOES: MEMBERS: _________________________________________________ ABSENT: MEMBERS: _________________________________________________ ABSTAIN: MEMBERS: _________________________________________________ _________________________________________________
MAYOR
ATTEST:
___________________________
CITY CLERK
1 Revised September 2024
Amendment No. 1
To The Technology-as-a-Service (SaaS) Agreement
Between
City of Fairfield
and the
The Routing Company
This Amendment No. 1, made by and entered into as of the _____ day of ______________, 2026, by and between the CITY of FAIRFIELD, a municipal corporation (hereinafter “CITY”), and THE ROUTING COMPANY (hereinafter “SERVICE PROVIDER”), for the purpose of reviewing the City of Fairfield Technology Software-as-a-Service Agreement with The Routing Company (hereinafter “AGREEMENT”) dated October 19, 2022, between the parties. This Amendment does not take effect until signed by both parties.
The revisions to the AGREEMENT are limited to those specific below. All other provisions of the AGREEMENT remain in effect as set forth in Exhibit “A”.
The AGREEMENT is amended as follows:
1. EXHIBIT “B,” PAYMENT, Section 1 of the AGREEMENT shall be amended to increase the total contract price by $85,000 for services rendered by the SERVICE PROVIDER, for a total amount not to exceed $457,991, which includes a 20% contingency of $62,160 based on fees for Services provided for a 60-month period.
Except as specifically set forth herein, all terms and conditions of the AGREEMENT between the CITY and SERVICE PROVIDER, dated October 19, 2022, shall remain in full force and effect.
In Witness whereof, the parties through their authorized representatives, have affixed their signature.
CITY OF FAIRFIELD
a municipal corporation (CITY)
By
David Gassaway, City Manager
THE ROUTING COMPANY
By
James Cox, CEO
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE (SaaS) AGREEMENT WITH The Routing Company
This AGREEMENT is made at Fairfield, California, as of Qc_;-obty 161 , 2022 (the " Effective Date"), by and between the City of Fairfield, a municipal corporation ( the " City") and T h e R o u t i n g C o m p a n y(" Service Provider"), who agree as follows:
1) SERVICES. Subject to the terms and conditions set forth in this Agreement, Service Provider shall provide to the City the services described in Exhibit " A" ( the " Scope of Services"), which consists of the following: ( a) Exhibit A- 1 — Statement of Work, ( b) Exhibit A- 2 — Product Schedule, ( c) Exhibit A- 3 — Service Level Agreement, ( d) Exhibit A- 4 - City' s Request for Proposal RFP"), ( e) Exhibit A- 5 —Service Provider' s response to RFP. Service Provider shall provide Services at the time, place, and in the manner specified in Exhibit " A." 2) PAYMENT. City shall pay Service Provider for the services rendered pursuant to this Agreement at the times and in the manner set forth in Exhibit " B." The payments specified in Exhibit " B" shall be the only payments to be made to Service Provider for services rendered pursuant to this Agreement. Service Provider shall submit all billings for said services to the City in the manner specified in Exhibit " B." 3) FACILITIES AND EQUIPMENT. Service Provider shall, at its sole cost and expense, furnish all facilities and equipment which may be required for furnishing Services pursuant to this Agreement.
4) COMPLETE AGREEMENT. The provisions set forth in Exhibits " A," " B," " C," and " D" are part of this Agreement. In the event of any inconsistency between the general provisions of Exhibit " C" and any other terms or conditions of this Agreement, the provisions set forth in Exhibit " C" shall control. All provisions in this Agreement control over any provision in Exhibit " A." In the event of a disagreement among the documents comprising Exhibit "A," Exhibit A- 1 controls over Exhibits A- 2 through A- 5; Exhibit A- 2 controls over Exhibits A- 3 through A- 5; Exhibit A-3 controls over Exhibits A- 4 through A- 5; and Exhibit A- 4 controls over Exhibit A- 5. 5) INSURANCE REQUIREMENTS. The insurance requirements set forth in Exhibit " D" are part of this Agreement. Notwithstanding any other provision to the contrary, in the event of any inconsistency between any other terms or conditions of this Agreement, the requirements set forth in Exhibit " D" shall control.
6) EXHIBITS. All exhibits referred to herein are attached hereto and are by this reference incorporated herein.
Rev 6/ 17/2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
7) TERM. This Agreement shall be effective upon the Effective Date and shall remain in effect for a period of two (2) years following the Effective Date (the " Initial Term"). Following the Initial Term, this Agreement shall automatically renew for three one ( 1) year terms, unless terminated pursuant to this Agreement or the City Manager, or his/ her designee, provides Service Provider written notice of the City' s intent to not renew the Agreement.
EXECUTED as of the day first above -stated.
City of airfiel , a munic al rpo tion
r
By: "--
signatur)e
Printed: - PAuL l<4tKll4L,--?)117LC%OfZeq=Tl¢ ljc- (k Aks Service Provider /
By:
signature)
Printed: CEO, The Routing Company
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
EXHIBIT " A"
SCOPE OF SERVICES
Services are described more particularly in the following exhibits, which comprise this Exhibit A:
Exhibit A- 1— Statement of Work
Exhibit A- 2 — Product Schedule
Exhibit A- 3 — Service Level Agreement
Exhibit A-4 — City' s Request for Proposal (" UP"), and Exhibit A- S — Service Provider' s response to RFP
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
Exhibit "A- 1"
Statement of Work
1. 0 DEFINITIONS: In this Agreement, the following terms have the following meanings, and all other capitalized terms have the meaning given to them elsewhere in this Agreement:
1. 01 " Authorized Persons" as used in this document means the Service Provider' s employees, contractors, subcontractors or other agents who need to access the public jurisdiction' s personal data to enable the Service Provider to perform the services required.
1. 02 " Data Breach" as used in this document means the unauthorized access by non - authorized person/ s that result in the use, disclosure or theft of a public jurisdiction' s unencrypted personal data.
1. 03 " Follow -the -sun" is a workflow model in which work is passed on to the offices located in different time zones. In this way work is done round- the- clock thereby reducing the support duration and increasing the responsiveness.
1. 04 " Individually Identifiable Health Information" as used in this document means information that is a subset of health information, including demographic information collectedfrom an individual, and (1) iscreatedorreceivedbyahealthcare provider, health plan, employer or healthcare clearinghouse; and (2) relates to the past, present or future physical or mental health or condition of an individual; the provision of health care to an individual; or the past, present or future payment for the provision of health care to an individual; and ( a) that identifies the individual; or (b) with respect to which there is a reasonable basis to believe the information can be used to identify the individual.
1. 05 " Non -Public Data" means data, other than personal data, that is not subject to distribution to the public as public information. It is deemed to be sensitive and confidential by the public jurisdiction because it contains information that is exempt by statute, ordinance or administrative rule from access by the general public as public information.
1. 06 " Personal Data" means data that includes information relating to a person that identifies the person by name and has any of the following personally identifiable information ( PII): government -issued identification numbers ( e. g. Social Security, driver' s license, passport); financial account information, including account number, creditordebitcardnumbers; or protected health information (PHI) relating toaperson. 1. 07 " Protected Health Information" (PHI) as used in this document is individually identifiable health information transmitted by electronic media, maintained inelectronic media, or transmitted or maintained inany other form or medium. PHI excludes education records covered by the Family Educational Rights and Privacy Act Rev. 6/17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
FERPA), as amended, 20 U. S. C. 1232g, records described at 20 U. S. C. 1232g( a)( 4)( B)( iv) and employment records held by a covered entity in its role as employer.
1. 08 " Personally Identifiable Information" ( PII) PII refers to a combination of data elements ( e. g. Social Security number, driver' s license or other government -issued identification number, passport number, financial account number, or credit or debit card number in combination with security codes) that, when linked to the individual' s first name or first initial and their last name, and not encrypted or otherwise could lead to the loss, theft or unauthorized use of the individual' s personal information.
1. 09 " Public Jurisdiction" means the City of Fairfield.
1. 10 " Public Jurisdiction Data" as used in this document means all data created or in any way originating with the public jurisdiction, and all data that is the output of computer processing of or other electronic manipulation of any data that was created by or in any way originated with the public jurisdiction, whether such data or output is stored on the public jurisdiction' s hardware; the Service Provider' s hardware or exists in any system owned, maintained or otherwise controlled by the public jurisdiction or by the Service Provider.
1. 11 " Public Jurisdiction Identified Contact" means the person or persons designated in writing by the public jurisdiction to receive security incident or breach notification.
1. 12 " Security Incident" means the potentially unauthorized access by non -authorized persons to personal data or non- public data that could reasonably result in the use, disclosure or theft of a public jurisdiction' s unencrypted personal data or non- public data within the possession or control of a Service Provider. A security incident may or may not turn into a data breach.
1. 13 " Service Level Agreement" (SLA) means a written agreement between both the public jurisdiction and the Service Provider that is subject to the terms and conditions in this document that unless otherwise agreed to includes ( 1) the technical service level performance promises ( i. e., metrics for performance and intervals for measure), ( 2) description of service quality, (3) identification of roles and responsibilities, (4) security responsibilities and notice requirements, ( 5) how disputes are discovered and addressed and ( 6) any remedies for performance failures.
1. 14 " Service Provider" means the contractor and its employees, subcontractors, agents and affiliates who are providing the services agreed to under the contract.
1. 15 " Software -as -a -Service" ( SaaS) means the capability provided to the consumer to use the provider' s applications running on a cloud infrastructure. The applications are accessible from various client devices through a thin client interface such as a Web browser ( e. g., Web -based email) or a program interface. The consumer does not Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
manage or control the underlying cloud infrastructure, including network, servers, operating systems, storage or even individual application capabilities, with the possible exception of limited user -specific application configuration settings.
1. 16 " Statement of Work" is a written statement in a solicitation document or contract that describes the public jurisdiction' s service needs and expectations.
2. 0 DESCRIPTION OF SERVICES
2. 1 Scope of Services
The scope of services to be performed by Service Provider under this Agreement is as described in this Statement of Work in Exhibit A of this Agreement.
2. 2 Data Ownership
The public jurisdiction will own all right, title and interest in its data that is related to the services provided by this contract. SERVICE PROVIDER shall not access public jurisdiction user accounts or public jurisdiction data, except ( 1) in the course of data center operations, (2) in response to service or technical issues, ( 3) as required by the express terms of this contract or (4) at the public jurisdiction' s written request.
2. 3 Data Protection
Protection of personal privacy and data shall be an integral part of the business activities of the Service Provider to ensure there is no inappropriate or unauthorized use of public jurisdiction information at any time. To this end, the Service Provider shall safeguard the confidentiality, integrity and availability of public jurisdiction information and comply with the following conditions:
a. The Service Provider shall implement and maintain appropriate administrative, technical and organizational security measures to safeguard against unauthorized access, disclosure or theft of personal data and non- public data. Such security measures shall be in accordance with recognized industry practice and not less stringent than the measures the Service Provider applies to its own personal data and non-public data of similar kind. b. All data obtained by the Service Provider in the performance of this contract shall become and remain the property of the public jurisdiction. c. All personal data shall be encrypted at rest and in transit with controlled access. Unless otherwise stipulated, the Service Provider is responsible for encryption of the personal data. Any stipulation of responsibilities will identify specific roles and responsibilities and shall be included in the service level agreement (SLA), or otherwise made a part of this contract. d. Unless otherwise stipulated, the Service Provider shall encrypt all non-public data at rest and in transit. The public jurisdiction shall identify data it deems as non -pubic data to the Service Provider. The level of protection and encryption for all non- public data shall be identified and made a part of this contract.
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
e. At no time shall any data or processes — that either belong to or are intended for the use of a public jurisdiction or its offers, agents or employees — be copied, disclosed or retained by the Service Provider or any party related to the Service Provider for subsequent use in any transaction that does not include the public jurisdiction. f. The Service Provider shall not use any information collected in connection with the service issued from this proposal for any purpose other than fulfilling the service.
2. 4 Data Location
The Service Provider shall provide its services to the public jurisdiction and its end users solely from data centers in the U. S. Storage of public jurisdiction data at rest shall be located solely in data centers in the U. S. The Service Provider shall not allow its personnel or contractors to store public jurisdiction data on portable devices, including personal computers, except for devices that are used and kept only at its U. S. data centers. The Service Provider shall permit its personnel and contractors to access public jurisdiction data remotely only as required to provide technical support.
The Service Provider may provide technical user support on a 24/ 7 basis using a Follow the Sun" model, unless otherwise prohibited in this contract.
2. 5 Security Incident
Service Provider shall inform the public jurisdiction of any security incident or data breach.
a. Incident Response: The Service Provider may need to communicate with outside parties regarding a security incident, which may include contacting law enforcement, fielding media inquiries and seeking external expertise as mutually agreed upon, defined by law or contained in the contract. Discussing security incidents with the public jurisdiction should be handled on an urgent as -needed basis, as part of Service Provider communication and mitigation processes as mutually agreed upon, defined by law or contained in the contract. b. Security Incident Reporting Requirements: The Service Provider shall report a security incident to the appropriate public jurisdiction identified contact immediately as defined in the SLA.
c. Breach Reporting Requirements: If the Service Provider has actual knowledge of a confirmed data breach that affects the security of any public jurisdiction content that is subject to applicable data breach notification law, the Service Provider shall ( 1) promptly notify the appropriate public jurisdiction identified contact within 24 hours or sooner, unless shorter time is required by applicable law, and ( 2) take commercially reasonable measures to address the data breach in a timely manner.
2. 6 Breach Responsibilities
This section only applies when a data breach occurs with respect to personal data within the possession or control of the Service Provider.
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
a. The Service Provider, unless stipulated otherwise, shall immediately notify the appropriate public jurisdiction identified contact by telephone in accordance with the agreed upon security plan or security procedures if it reasonably believes there has been a security incident.
b. The Service Provider, unless stipulated otherwise, shall promptly notify the appropriate public jurisdiction identified contact within 24 hours or sooner by telephone, unless shorter time is required by applicable law, if it confirms that there is, or reasonably believes that there has been a data breach. The Service Provider shall ( 1) cooperate with the public jurisdiction as reasonably requested by the public jurisdiction to investigate and resolve the data breach, ( 2) promptly implement necessary remedial measures, if necessary, and ( 3) document responsive actions taken related to the data breach, including any post -incident review of events and actions taken to make changes in business practices in providing the services, if necessary.
c. Unless otherwise stipulated, if a data breach is a direct result of the Service Provider' s breach of its contract obligation to encrypt personal data or otherwise prevent its release, the Service Provider shall bear the costs associated with ( 1) the investigation and resolution of the data breach; ( 2) notifications to individuals, regulators or others required by state law; (3) a credit monitoring service required by state or federal) law; (4) a website or a toll -free number and call center for affected individuals required by state law — all not to exceed the average per record per person cost calculated for data breaches in the United States ( currently $ 201 per record/ person) in the most recent Cost of Data Breach Study: Global Analysis published by the Ponemon Institute at the time of the data breach; and ( 5) complete all corrective actions as reasonable determined by Service Provider based on root cause; all [( 1) through ( 5)] subject to this contract' s limitation of liability.
2. 7 Notification of Legal Requests
The Service Provider shall contact the public jurisdiction upon receipt of any electronic discovery, litigation holds, discovery searches and expert testimonies related to the public jurisdiction' s data under this contract, or which in any way might reasonably require access to the data of the public jurisdiction. The Service Provider shall not respond to subpoenas, service of process and other legal requests related to the public jurisdiction without first notifying the public jurisdiction, unless prohibited by law from providing such notice.
2. 8 Termination and Suspension of Service
a. In the event of a termination of the contract, the Service Provider shall implement an orderly return of public jurisdiction data in a CSV or Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
another mutually agreeable format at a time agreed to by the parties and the subsequent secure disposal of public jurisdiction data. b. During any period of service suspension, the Service Provider shall not take any action to intentionally erase any public jurisdiction data. c. In the event of termination of any services or agreement in entirety, the Service Provider shall not take any action to intentionally erase any public jurisdiction data for a period of:
10 days after the effective date of termination, if the termination is in accordance with the contract period;
30 days after the effective date of termination, if the termination is for convenience;
60 days after the effective date of termination, if the termination is for cause.
After such period, the Service Provider shall have no obligation to maintain or provide any public jurisdiction data and shall thereafter, unless legally prohibited, delete all public jurisdiction data in its systems or otherwise in its possession or under its control.
d. The public jurisdiction shall be entitled to any post- termination assistance generally made available with respect to the services, unless a unique data retrieval arrangement has been established as part of the SLA.
e. The Service Provider shall securely dispose of all requested data in all of its forms, such as disk, CD/ DVD, backup tape and paper, when requested by the public jurisdiction. Data shall be permanently deleted and shall not be recoverable, according to National Institute of Standards and Technology (NIST)- approved methods. Certificates of destruction shall be provided to the public jurisdiction.
2. 9 Background Checks
The Service Provider shall conduct criminal background checks and not utilize any staff, including subcontractors, to fulfill the obligations of the contract who have been convicted of any crime of dishonesty, including but not limited to criminal fraud, or otherwise convicted of any felony or misdemeanor offense for which incarceration for up to 1 year is an authorized penalty. The Service Provider shall promote and maintain an awareness of the importance of securing the public jurisdiction' s information among the Service Provider' s employees and agents.
2. 10 Access to Security Logs and Reports
The Service Provider shall provide reports to the public jurisdiction in a format as specified in the SLA agreed to by both the Service Provider and the public jurisdiction. Reports shall include latency statistics, user access, user access IP address, user access history and security logs for all public jurisdiction files related to this contract.
2. 11 Contract Audit
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
The Service Provider shall allow the public jurisdiction to audit conformance to the contract terms. The public jurisdiction may perform this audit or contract with a third party at its discretion and at the public jurisdiction' s expense.
2. 12 Data Center Audit
The Service Provider shall perform an independent audit of its data centers at least annually at its expense, and provide a redacted version of the audit report upon request. The Service Provider may remove its proprietary information from the redacted version. A Service Organization Control (SOC) 2 audit report or approved equivalent sets the minimum level of a third -party audit.
2. 13 Change Control and Advance Notice
The Service Provider shall give advance notice (to be determined at the contract time and included in the SLA) to the public jurisdiction of any upgrades ( e. g., major upgrades, minor upgrades, system changes) that may impact service availability and performance. A major upgrade is a replacement of hardware, software or firmware with a newer or better version in order to bring the system up to date or to improve its characteristics. It usually includes a new version number.
2. 14 Security
The Service Provider shall disclose its non- proprietary security processes and technical limitations to the public jurisdiction such that adequate protection and flexibility can be attained between the public jurisdiction and the Service Provider.
For example: virus checking and port sniffing — the public jurisdiction and the Service Provider shall understand each other' s roles and responsibilities.
2. 15 Non -disclosure and Separation of Duties
The Service Provider shall enforce separation of job duties, require commercially reasonable non -disclosure agreements, and limit staff knowledge of public jurisdiction data to that which is absolutely necessary to perform job duties.
2. 16 Import and Export of Data
The public jurisdiction shall have the ability to import or export data in piecemeal or in entirety at its discretion without interference from the Service Provider. This includes the ability for the public jurisdiction to import or export data to/ from other Service Providers.
2. 17 Responsibilities and Uptime Guarantee
The Service Provider shall be responsible for the acquisition and operation of all hardware, software and network support related to the services being provided. The technical and professional activities required for establishing, managing and maintaining the environments are the responsibilities of the Service Provider. The system shall be available
24/ 7/ 365 ( with agreed -upon maintenance downtime), and provide service to customers as defined in the SLA.
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
2. 18 Subcontractor Disclosure
The Service Provider shall identify all of its strategic business partners related to services provided under this contract, including but not limited to all subcontractors or other entities or individuals who may be a party to a joint venture or similar agreement with the Service Provider, and who shall be involved in any application development and/ or operations.
2. 19 Right to Remove Individuals
The public jurisdiction shall have the right at any time to require that the Service Provider remove from interaction with public jurisdiction any Service Provider representative who the public jurisdiction believes is detrimental to its working relationship with the Service Provider. The public jurisdiction shall provide the Service Provider with notice of its determination, and the reasons it requests the removal. If the public jurisdiction signifies that a potential security violation exists with respect to the request, the Service Provider shall immediately remove such individual. The Service Provider shall not assign the person to any aspect of the contract or future work orders without the public jurisdiction' s consent.
2. 20 Business Continuity and Disaster Recovery
The Service Provider shall provide a business continuity and disaster recovery plan upon request and ensure that the public jurisdiction' s recovery time objective ( RTO) of 24 hours/ 7days is met.
2. 21 Compliance with Accessibility Standards
The Service Provider shall comply with and adhere to Accessibility Standards of Section 508 Amendment to the Rehabilitation Act of 1973.
2. 22 Web Services
The Service Provider shall use Web services exclusively to interface with the public jurisdiction' s data in near real time when possible.
2. 23 Encryption of Data at Rest
The Service Provider shall ensure hard drive encryption consistent with validated cryptography standards as referenced in FIPS 140-2, Security Requirements for Cryptographic Modules for all personal data, unless the public jurisdiction approves the storage of personal data on a Service Provider portable device in order to accomplish work as defined in the statement of work.
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
Exhibit "A- 2"
Product Schedule
Rev. 6/ 17/ 2018
2. 4 Product Documentation
Please refer to Attachment B for User Stories and Attachment C for Training Manuals.
Part 3 - Training, Deployment, and Ongoing Support
3. 1 Deployment Plan
3. 1. 1 Project Implementation Schedule
Below is a table of all tasks to be completed from the Notice to Proceed ( NTP) through the Launch and Post- Launch/ Ongoing Operations. Our typical launch process is approximately 8 weeks, which means that there will be more than enough time to properly set up and market FAST' s new on -demand microtransit service between City Council Approval on October 18, 2022 and Phase I Service launching February 4, 2023. We intend to establish clear client goals at kickoff ( such as how best to increase ridership) and hold your hand throughout the entire process. As the below table indicates, our implementation plan would begin in mid -December 2022:
Project Stage Duration & Activities/Deliverables Key Team Members Estimated
Completion
Operational 1 Week - Project Kickoff Meeting Pandora
Planning November Identify key stakeholders Shelley
28 - and service goals Carlyn Hunt
December Determine marketing needs Dick Alexander
5, 2022 Confirm product scope and Dietter Aragon
launch timeline
Setup/ Reporting 1 Week Create fleet and service Pandora Configuration December 5 zones Shelley
12, 2022 Set parameters and service Carlyn Hunt
settings Niko
Set up test environment Rekviashili
Provide training materials Connor
Determine required Caldicott
reporting parameters
Use simulation tools to
validate planned service
zones
Standard reporting
developed, finalized, and
approved
Internal Testing 1 Week Test new features Carlyn Hunt
December Test service area Alex Wallar
12 - 19, boundaries and operating Niko
2022 hours Rekviashili
Test apps Sergei
Test agency dashboard Babovich
Michael Wade
21
Christmas/ New December N/ A N/ A
Year's Holiday 19, 2022 -
Break January 2,
2023
Training 2 Weeks End user training ( driver, call Pandora January 3 - center) Shelley
17, 2023 Administrator training Carlyn Hunt
dashboard, system Richard Forget
administration) Niko
IT Staff Training Rekviashili
On -site testing with drivers Dietter Aragon
and fleet operators
Marketing 8 Weeks Press release and comms James Cox
Support December Brand Ambassadors & Dick Alexander
5, 2022 - street teams Pandora
February 4, Digital marketing Shelley
2023 Email marketing Carlyn Hunt
Thought leadership Richard Forget
Local partnerships
Event sponsorships
Soft Launch 1 Week Launch app to test riders Pandora
January 26 - Respond to user feedback Shelley
February 3, on the ground Carlyn Hunt
2023 Potential product updates Richard Forget
based on feedback Niko
Rekviashili
Hard Launch 1 Week Systems and feedback James Cox
Go -Live) February 4 - monitoring Dick Alexander
February 11, Rider education and Pandora
2023 ongoing outreach Shelley
Release launch marketing Carlyn Hunt
Dietter Aragon
Operations Post- Ongoing system Cody Lowe
Post -Launch Launch performance analysis and Dick Alexander through life reporting Pandora
of contract Ongoing user feedback Shelley
Ongoing marketing support Richard Forget
February 11, to increase ridership Niko
2023- Ongoing system and Rekviashili
February 4, parameter optimization Dietter Aragon
2025 Ongoing on -demand service
planning, evaluation and
guidance
Ongoing engagement with
current and potential riders
to enhance product and
operations efforts.
22
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
Exhibit "A- 3"
Service Level Agreement
Rev. 6/ 17/ 2018
Service Level Agreement
Section A: IT Maintenance, Outages, and Reporting Capabilities TRC maintains a robust system uptime which will be provided to Customer on our System Status page that is typically updated every fifteen ( 15) minutes. As a SaaS provider, our system will occasionally be offline due to (1) routine maintenance and ( 2) unexpected outages. We operate strict policies to provide rapid notification and immediate reconciliation to minimize or altogether prevent any impact to the platform. TRC will use commercially reasonable efforts to meet the obligations set forth in this SLA.
1. Routine Updates & Maintenance: TRC provides a technology platform that includes components which require occasional changes, fixes or other updates to maintain system stability, security and to provide the latest features. This may require the system to be offline for testing. All parties that will be impacted by planned maintenance should be informed a minimum of 7 days prior to the scheduled maintenance taking place. We will coordinate this with your assigned project lead.
a. We reserve the right to perform scheduled maintenance. b. System maintenance will take place outside of Standard Service Hours, when possible, to minimize impact on the service. We will coordinate any departure from the foregoing with your assigned project lead in advance.
C. All software will be developed in accordance with recognized quality assurance standards and the standards used will be stated.
2. Unexpected Issues & Outages: We will notify Customer if there is an unexpected software issue or critical failure.
a. TRC will provide system status updates via an active landing page that is updated every fifteen ( 1S) minutes for issues classified as " Severe", and every 60 minutes for all other incidents. Customer can subscribe to this status page to receive real time updates. This page will include the ability to view current system status of all TRC systems, view historical incidents, and subscribe to email, text, slack, and RSS feed updates for your stakeholders. You will receive an automatic notification when there is an unexpected system issue.
b. After any incident, Partner Success Managers will be available to communicate any follow-up information to Customers during scheduled meetings or through email.
C. TRC will notify all impacted riders or drivers via the Rider or Driver App within 30 minutes for issues classified as " Severe". TRC & Customer will mutually agree on the standard notice that will be used for severe notices. Non -severe issues can be communicated to riders at Customer' s request.
d. Please note that 3rd party provider outages may impact our ability to resolve issues in an immediate manner. We will work with our 3rd party providers to resolve these issues promptly and will continue to provide incident updates. e. For the highest -level incidents, such as a system outage, technical staff will work 24/ 7 until the problem is resolved and service restored. TRC reserves the right to reasonably increase or decrease the priority level of an outage in its sole discretion. However, Customer can request an increase in the level of severity of an issue that will be promptly reviewed by TRC staff. In accordance with the service commitment provided in this SLA, TRC will use all commercially reasonable efforts to resolve all requests in accordance with the response times below.
Incident Priority Level Description Time to Response
Severe Service is unavailable or a 30 minutes, 24x7x365 substantial subset of
functionality is unavailable
without a workaround,
security issues, or data
integrity issues.
High Intermittent issues, issues with 1 hour
system performance, and
issues with available
workarounds.
Medium Any other bugs and issues that 12 hours
are not considered as Severe
and High.
Low Enhancements or feature 1 business day
requests
3. Reporting Capabilities:
a. The System shall provide reporting functions to permit Customer to access performance data and the achievement of the service goals.
b. TRC can provide performance reports at an agreed -upon cadence. Performance reports shall contain but are not limited to:
i. service levels against performance standards
ii. summary of all faults that occurred during the reporting period, including details not limited to:
o the time/ date raised/ occurred
o fault category
o impact of fault/ duration of the outage
Section B: Customer Support
TRC will provide Customer with ongoing customer support. This includes ( 1) in- app & dashboard chat support and email communication, ( 2) regularly scheduled meetings from implementation through launch, and ( 3) ongoing partner success support.
Technical support
1. All technical issues should be sent to TRC via intercom. Intercom is an instant messaging style platform directly integrated into the Rider App, Driver App, and Administrative Dashboard. a. TRC will use Intercom as its primary support channel of communication with Customer passengers, drivers and operators for technical issues. b. Intercom support will be available during all Customer service hours Non -technical inquiries from passengers will be answered using the call center service provided by Customer and/ or the designated operator. Where TRC receives non -technical inquiries through Intercom, TRC will direct passengers to phone the call center to receive local support related to the service operations.
Service support
2. Launch support: TRC will host weekly project calls with Customer during the implementation process.
3. Ongoing Support: Post launch, TRC will continue to provide dedicated operational support from launch throughout the term of agreement. This will include direct ongoing support from a Partner Success Manager (PSM) in the following agreed ways:
a. Weekly Partnership Meetings
b. Email support Customer will provide names and contact information, including email addresses, for those who will be responsible for ongoing communication with TRC.
Your dedicated Partner Success Manager will assist with the following activities:
Performance Monitoring: Your PSM will actively monitor program performance and work closely with the Customer team to discuss metrics, trends, and operations.
ii. Product Education: Your PSM will be responsible for educating Customer staff on all new product features and provide training on any specific tool or feature as needed.
iii. Marketing: Awareness is crucial to program success. Your PSM will assign a Rider Growth Manager to act as an ongoing consultant to Customer and provide templates for print and digital marketing material that can support your agency - driven marketing initiatives.
iv. Escalated Customer Complaints: The PSM will be available to Customer via email for any escalated issues or customer complaints.
Special notices
Customer may request custom notices to Riders by emailing the Partner Success Manager their request.
Customer will provide TRC at least 48 hours' notice for any special notice requests.
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
Exhibit "A-4"
City' s Request For Proposal ( RFP)
See attached]
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD, CALIFORNIA
NOTICE TO QUALIFIED FIRMS
NOTICE IS GIVEN that the City of Fairfield will receive Proposals for:
On -Demand ( Microtransit) and In -Advance (Paratransit) Scheduling, Dispatch, and Management Software
Introduction
The City of Fairfield' s transit system, FAST, (the City or FAST) is soliciting proposals from qualified Firms to provide software and related services to support an On -Demand Microtransit system and In -Advance Paratransit scheduling, dispatch and reservation software. The City is looking for a qualified Firm that can provide all deployment, system management, and technical needs as outlined in Attachment A for a Service described in Section 4 with specifications in Section 5 and features detailed in Section 7. The Firm must provide a platform that supplies an on -demand environment for managing and supporting one or both of FAST' s operations. In the event a single Firm cannot provide all components needed, FAST reserves the right to award to multiple Firms to meet the City' s needs.
Protect Goals
1. Provide cost efficient and effective service so that FAST can serve as many people as possible with limited resources, including maximizing shared rides to the extent possible
2. Provide high quality customer service
3. Provide equitable service that benefits all populations, including disadvantaged populations
4. Attract new riders to public transit
Project Schedule
RFP Release
Pre -Proposal Conference ( 11: 00am)
Questions Due
City answers provided
Proposals Due
Firm Interviews (week of)
Highest Rated Firm Selected
City Council Approval
Service Launch
Wednesday, May 11, 2022
Thursday, May 19, 2022
Monday, May 30, 2022
Friday, June 10, 2022
Thursday, July 7, 2022
Monday, August 22, 2022
Thursday, September 1, 2022
Tuesday, October 18, 2022
Saturday, February 4, 2023
The City will not fund this project with federal monies. An electronic copy of the complete RFP document and support reference documents can be obtained by downloading the RFP from the Fairfield and Suisun Transit' s website (https:// fasttransit.org/ about- us/ rfprfgs/).
Each proposal must be submitted in accordance with the requirements listed in the RFP package that is also on file at the FAST Administration Office, 2000 Cadenasso Drive, Fairfield, CA 94533.
TABLE OF CONTENTS
SECTION 1: PURPOSE OF THE REQUEST FOR PROPOSAL.................................... 4 SECTION 2: INTRODUCTION AND BACKGROUND.................................................... 4 SECTION 3: INSTRUCTIONS TO PROPOSERS........................................................... 4 A. SUBMITTAL................................................................................................... 4 B. PRE -PROPOSAL CONFERENCE AND QUESTIONS REGARDING RFP.... 5 C. PROPOSAL CONTENTS............................................................................... 6 D. PROPOSAL EVALUATION............................................................................ 8 E. SELECTION PROCESS................................................................................. 9 F. MODIFICATION OR CANCELLATION OF RFP.......................................... 10 G. NOTICE OF INTENT TO AWARD................................................................ 10 H. FINAL DETERMINATION............................................................................. 10 I. UNSUCCESSFUL PROPOSERS/SELECTION DISPUTES .......................... 10 J. INSURANCE REQUIREMENTS................................................................... 10 SECTION 4: SERVICE OVERVIEW............................................................................. 14 SECTION5: SPECIFICATIONS................................................................................... 17 SECTION 6: EXPERIENCE AND REFERENCES........................................................ 22 SECTION 7: FEATURE CHECKLIST........................................................................... 23 SECTION 8: PRICING SHEET..................................................................................... 25 APPENDIX A: TECHNOLOGY SOFTWARE -AS -A -SERVICE (SAAS) DRAFT AGREEMENT............................................................................................................... 26
SECTION 1: Purpose of the Request for Proposal
The City of Fairfield ( City) seeks to retain a qualified and committed technology Firm to provide software to book on -demand microtransit trips and in -advance paratransit trips to City of Fairfield residents. This ambitious project will include launching microtransit in the two zones described in the Service Overview ( Section 4) and providing software for traditional ADA complimentary paratransit throughout the rest of the service area. In addition to providing the technology, the successful Firm will assist the City in marketing the services, training its administrative and operations staff, and providing ongoing customer support. In addition to the two new microtransit zones, the City also envisions replacing its existing reservation, scheduling, and dispatch system for its complementary paratransit service. It is anticipated that the microtransit service will grow to operate city-wide in mid- 2023, and therefore, it is critical that any software solution proposed be able to reserve, schedule, and dispatch on -demand microtransit services as well as ADA-compliant paratransit services.
SECTION 2: Introduction and Background
The City of Fairfield is the county seat in Solano County, California. The City is currently growing at a rate of 0. 39% annually, reaching its highest population of 118, 043 in 2021.
Spanning over 41 miles, Fairfield has a population density of 2, 866 people per square mile and approximately 38,000 housing units as of 2020.
Solano County is one of the most diverse counties in the United States, and Fairfield and Suisun City demographics reflect that diversity with both cities having significant Hispanic, Black, and Asian populations.
The City of Fairfiield' s transit system is Fairfield and Suisun Transit (FAST), and the City of Fairfield has operated service since 1975. FAST currently operates eight (8) local fixed routes in Fairfield. FAST also provides DART ADA complementary paratransit service within Fairfield and Suisun City. DART service within Suisun City will cease December 31, 2022. MV Transportation is the operating contractor for FAST local and paratransit services.
The COVID- 19 pandemic has fundamentally changed the way transit has traditionally operated, and FAST was no exception to coronavirus service impacts. In December 2020, FAST began a Comprehensive Operational Analysis ( COA) of its fixed route, paratransit, and local taxi services known as FAST Forward. The COA's recommends select lesser utilized fixed routes be replaced with on -demand microtransit to provide Fairfield residents with a more personalized, efficient, and responsive transit option.
SECTION 3: Instructions to Proposers
A. SUBMITTAL
Proposals must be submitted electronically via email to Shaun Vigil 4
svigil@fairfield. ca. gov). Proposals should be titled: "[ Name of Firm] On- Demand/ In-Advance Scheduling System — Technical Proposal." " Firm Name" must be the name of the prime Firm. The technical proposal should include Parts 1- 3 per Section C.
The Pricing Sheet included as Section 8 of this solicitation must be electronically submitted in a separate file titled: "[ Name of Firm] On- Demand/ In-Advance Scheduling System — Pricing Sheet." " Firm Name" must be the name of the prime Firm.
The Cost Proposal file will not be opened until each submitted Technical Proposal has been carefully reviewed and evaluated, and the highest ranked Firm has been selected.
The Cost Proposal will form the basis of contract negotiations.
Technical and Cost Proposal submissions will be accepted until 4: 00 p. m. PST on Thursday, July 7, 2022. The timeliness of proposal submission is the sole responsibility of the Firm.
The Technical Proposal should not exceed thirty (30) double -sided pages. The page limitation does not apply to the following sections:
Part 2 — Product Documentation ( all other technical proposal sections are included in the page count)
Section 7 — Feature Checklist
Section 8 — Pricing Sheet
Any proposal not received by the specified date and time will be automatically rejected and will not receive further consideration by the City. The City reserves the right to reject all proposals, disqualify nonconforming or incomplete proposals at its sole discretion, waive deviations from the RFP, and determine whether Firms are qualified. A proposal may be deemed incomplete unless all requirements identified below in Section C of this RFP are submitted to the City as prescribed above.
All proposals submitted to the City in response to this RFP shall become the property of the City and will not be returned and such proposals are subject to the California Public Records Act.
Proposals shall be valid for a minimum of 120 calendar days following submission.
B. PRE -PROPOSAL CONFERENCE AND QUESTIONS REGARDING RFP A non -mandatory, virtual pre -proposal conference will be held on Thursday, May 19, 2022 at 11: OOam. It is highly recommended that interested Firms attend this meeting.
Please RSVP no later than May 17, at 11: 00 a. m. PST to Shaun Vigil svigiICu)fairfield. ca. gov) to confirm attendance.
Questions regarding any part of the RFP may be submitted in writing via email to Shaun Vigil at svigil@fairfield. ca.gov. All email correspondence shall use the title Fairfield and Suisun Transit On- Demand/In-Advance Scheduling System-RFP in the subject line. All written requests for RFP clarifications must be received by 4: 00 p. m. PST on May 30, 2022. The City will provide clarification throughout the procurement period.
No contact with City staff or Councilmembers is permitted. Only information received through the official question and answer process may be relied upon by the Proposer.
C. PROPOSAL CONTENTS
To facilitate evaluation of the proposal, Firms are required to adhere to the following format:
Part 1 — Company and Product Overview
1. Transmittal Letter: The Firm must submit one original Transmittal Letter of no more than three (3) pages signed by an official authorized to solicit business and enter into contracts for the proposing Firm. The Transmittal Letter must include:
Years in business
Executive Team ( c-suite or similar)
Organization chart of submitting Firm
Authorized official' s name, title and contact information The Transmittal Letter must also include the Firm' s valid Federal Taxpayer Identification Number (FEIN).
2. Section 6 — Experience and References: Complete Section 6 providing at least five 5) projects either in progress or completed within the last three years. Projects that have been awarded but not yet in service are not eligible experience. The City reserves the right to visit and contact any or all the references listed in Section 6.
3. Product Overview: Provide an overview of the product of no more than five ( 5) pages including key features, unique selling proposition and key Firm differentiators.
4. Exceptions to Software as a Service Agreement: The Firm must state in writing any exceptions it has to provisions of the Software as a Service Agreement attached in Appendix A. If such exceptions exist, the Firm must provide alternative language to address any exceptions, which will be taken under consideration by the City.
The contact names provided with the project descriptions will be considered references and may be contacted. The information provided must be up-to- date or the proposal may be considered nonresponsive.
Part 2 — Project -specific work plan and feature overview Please provide details on how your product will meet FAST's needs for this project.
Specific examples are highly recommended.
Technical approach — Explain how the solution meets the specifications outlined in Attachment A of this solicitation.
2. Commingling of Demand Responsive Services — Please provide as part of your proposal submittal best practices and experience on how FAST can continue to meet ADA standards while commingling microtransit and paratransit services using the Firm' s technology. If Firm has successfully replaced paratransit with on -demand shuttles previously, please specify how the Firm ensured its technology and reporting met ADA complementary paratransit requirements. We are requesting Firms be highly specific in this area. Providing written documentation from existing clients along with recent experience commingling paratransit and microtransit services is highly advised.
3. Section 7 — Feature Checklist — Firms are required to complete Section 7 of this RFP, the Feature Checklist, and provide information on any features missing from their products and best practices of how to achieve the same results with the Firm' s features.
4. Product Documentation: Provide the following documents as attachments to the Proposal ( this information is not included in the page count).
1. System setup manual
2. Driver training manual
3. Dispatcher training manual
4. User stories — how will users interact with the solution ( 1- page each maximum)
a. Dispatcher
b. Driver
c. Manager (administrative)
d. Paratransit user
e. Fixed -route user
f. New rider
g. Commuter
Part 3 — Training, Deployment and Ongoing Support
1. Deployment Plan — Provide a plan to deploy the solution including at a minimum:
A. Project Implementation Schedule that adheres to the City' s schedule.
B. Marketing and outreach approach — Explain how the Firm will assist FAST in marketing the service to grow ridership.
C. Software cutover approach — Explain how the Firm will assist City transition from existing solution to new solution.
2. Training Plan — Explain Firm' s approach to training and educating City staff on proper usage of the solution.
3. Post -launch support approach —Describe how the Firm will support the project after launch.
4. System expansion — Describe the Firm' s approach to system expansion from Phase 1 to Phase 2 but also within Phase 1 if budget allows.
5. Feature exception/alternatives — Only list features that the solution is incapable marked " no" on Section 7 worksheet) of completing. For each feature that Firm' s solution cannot address, describe alternative or approximate date when feature will be deployed.
Part 4 — Cost Proposal
2. Cost Proposal: Provide a completed Pricing Sheet (Section 8).
The Cost Proposal must be electronically submitted as a separate file titled "[ Name of Firm] On- Demand/In-Advance Scheduling System — Pricing Sheet." " Name of Firm" must be the name of the prime Firm.
D. PROPOSAL EVALUATION
Proposals shall first be reviewed using a Pass/ No Pass approach to qualify Firms to move onto proposal review and scoring. Only those proposals that pass the criteria shall proceed to the Technical Criteria evaluation stage. Each passing proposal will then be scored against the Technical Criteria cited below.
Pass/ No Pass Criteria
Section 6 — Complete and Accurate Firm Experience. FAST expects that Firms must have a track record of managing real-time and in -advance bookings and on demand routing.
Section 7 — Feature Worksheet. Firms must have launched on demand technologies for agencies or municipalities that operate fixed route and paratransit services and replaced either with on demand technology provided by the Firm. FAST also expects firms to be able to launch technology for multiple shuttle zones and potentially operators. It should be noted that FAST currently only has one operator and multiple operators are not envisioned, however, in order to future -proof the solution, FAST is requiring the successful solution to be multi -operator capable.
Exceptions to Software as a Service Agreement — Those proposals that include exceptions to the Software as a Service Agreement attached as Appendix A that are deemed unacceptable to the City or proposals that do not meet the proposal format requirements may be eliminated at the City' s discretion. Eliminated proposals will not proceed any further in the evaluation.
The City reserves the right to waive the Pass/ No Pass evaluation and move directly to the Technical Criteria evaluation.
Technical Criteria
Criteria Detail Scoring
Firm' s approach to meeting the
Technical Approach requirements in this document and 40 points achieving the City' s goals.
Qualifications/experience Firm' s experience (Section 6) deploying 15 points solutions for similar types of needs.
Training/ Deployment/Support Proposer's training plan, deployment 30 points Ian, and support plan B-A)/A] x C = Final Pricing Score
A —the lowest Offeror's cost.
Pricing B— the Offeror's cost being scored.
C— the maximum number of cost points available. 15 points Note: If the formula results in a negative number (which will occur when the Offeror's cost is more than twice the lowest cost), zero points shall be assigned.
E. SELECTION PROCESS
The selection process will consist of the following:
An Evaluation Committee (comprised of 3- 5 City staff with the support of an outside subject matter expert) will conduct the Pass/ No Pass review. Proposals will move on to the technical review and will be ranked to develop a shortlist of finalists. The City reserves the right to request additional information that, in the City' s opinion, is necessary to ensure the Firm' s competence, qualified employees, business organization and financial resources are adequate for the performance of the services under this RFP.
2. Finalists will be invited to make an oral presentation to the Evaluation Committee.
3. The Evaluation Committee shall use the additional information gathered in oral interviews to update their score. The pricing of the highest rated Firm will then be reviewed and compared to the independent cost estimate developed for this project.
4. The City will attempt to negotiate a mutually satisfactory agreement with the highest-ranking Firm. If an agreement cannot be reached with the highest-ranking Firm, the City will attempt to negotiate an agreement with the second highest-ranking Firm, and so forth.
5. Approval of the Proposer recommended by City staff will be submitted to the City Council with a recommendation for award of the contract. The Software as a Service Agreement to be used for the project is attached as Appendix A.
F. MODIFICATION OR CANCELLATION OF RFP
The City of Fairfield reserves the right to adjust the RFP schedule and/ or cancel the RFP process at any time without prior notice. The City is not liable for any costs incurred to prepare the proposal.
G. NOTICE OF INTENT TO AWARD
Once the Evaluation Committee has successfully negotiated an agreement with the Firm, City staff will send the recommended Firm three ( 3) original copies of the Software as a Service Agreement. Upon receiving these documents, the recommended Firm shall sign all three ( 3) copies of the Software as a Service Agreement and return them to City within five ( 5) business days. All insurance documentation is to accompany submittal of the Software as a Service Agreement.
H. FINAL DETERMINATION
The Evaluation Committee will forward its recommendation for the contract award along with the three (3) signed copies of the Agreement to the Fairfield City Council. After review and consideration of this recommendation, the City Council has the discretion to.. 1) award the contract, or 2) reject all proposals.
I. UNSUCCESSFUL PROPOSERS/SELECTION DISPUTES
After the Evaluation Committee finalizes its recommendation, the unsuccessful Firms will be notified of the City' s intent to recommend the City Council award the contract to the recommended Firm.
Unsuccessful Firms will be debriefed upon their written request. Debrief requests must be submitted to City staff within five (5) business days after City Council award of contract.
J. INSURANCE REQUIREMENTS
Service Provider shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Service Provider, its agents, representatives, or employees.
H
1) MINIMUM SCOPE AND LIMITS OF INSURANCE
a) Commercial General Liability coverage ( occurrence Form CG 00 01) with minimum limits of $ 1, 000, 000 per occurrence for bodily injury, personal injury, products and completed operations, and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.
b) Automobile Liability coverage ( Form CA 00 01 with Code 1 — any auto) with minimum limits of $ 1, 000, 000 per accident for bodily injury and property damage.
c) Workers' Compensation insurance as required by the State of California and Employers' Liability insurance, each in the amount of $ 1, 000, 000 per accident for bodily injury or disease.
2) INDUSTRY SPECIFIC COVERAGES
If checked below, the following insurance is also required.
X Cyber Liability Insurance in the minimum amount of $ 1, 000, 000 per occurrence. 3) INSURANCE PROVISIONS
a) DEDUCTIBLES AND SELF -INSURED RETENTIONS. Any deductibles or self -insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self -insured retentions as respects the City, its officers, officials, employees and volunteers; or the Service Provider shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses. b) The general and automobile liability policies ( and if applicable, cyber liability, garage keepers liability and builder' s risk policies) are to contain, or be endorsed to contain, the following provisions:
i) The City, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of work or operations performed by or on behalf of the Service Provider; products and completed operations of the Service Provider; premises owned, occupied or used by the Service Provider; and automobiles owned, leased, hired or borrowed by the Service Provider. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii) For any claims related to this project, the Service Provider's insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self -insured maintained by the City, its officers, officials, employees or volunteers shall be excess of the Service Provider's insurance and shall not contribute with it.
iii) Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers. iv) The Service Provider's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability.
v) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty ( 30) days' prior written notice by certified mail, return receipt requested, has been given to the City.
vi) The policy limits of coverage shall be made available to the full limits of the policy. The minimum limits stated above shall not serve to reduce the Service Provider's policy limits of coverage.
Therefore, the requirements for coverage and limits shall be ( 1) the minimum coverage and limits specified in this agreement, or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named insured, whichever is greater.
c) ACCEPTABILITY OF INSURER. Insurance is to be placed with insurers with a current A.M. Best' s rating of no less than A:VII, unless otherwise acceptable to the City. d) VERIFICATION OF COVERAGE. Service Provider shall furnish the City with original endorsements effecting coverage required by this Section J. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. The endorsements are to be on forms equivalent to CG 20 10 11 85 subject to City approval. All insurance certificates and endorsements are to be received and approved by the City before work commences, these documents must be submitted electronically through the Exigis insurance system, certificates-fairfield riskworks. com. At the request of the City, Service Provider shall provide complete copies of all required insurance policies, including endorsements effecting the coverage required by these specifications.
e) SUB -CONTRACTORS. Service Provider shall require all subcontractors to procure and maintain insurance policies subject to the requirements of this Section J.
Failure of Service Provider to verify existence of sub -contractor's insurance shall not 12
relieve Service Provider from any claim arising from sub -contractors work on behalf of Service Provider.
Remainder of Page Intentionally Left Blank]
13
SECTION 4: SERVICE OVERVIEW
Service Area and Other Kev Proiect Details
The proposed microtransit pilot zones feed key locations and fixed routes throughout the FAST service area. Maps of the two ( 2) proposed service areas are shown below.
FAST will initially start with these two service areas and may add new areas in the future. Service in both zones will be commingled on -demand microtransit and paratransit. FAST will provide all vehicles (4 in Phase 1 and up to 3 more in Phase 2) and operators and dispatch support through its current contractor MV Transportation. It should be noted that these zones are preliminary only.
FAST expects to finalize the locations prior to the award. However, we expect the successful solution to be flexible enough to include features that allow timed connections to fixed route and stops at existing locations.
Phase 1 — Initial Zones
Zone 1 — Cordelia/Green Valley
Zone 1 is in the southwest portion
of FAST' s service area currently
served by Route 8. The zone will
include connections to the Fairfield
Transportation Center (FTC),
Solano County Health and Human
Services, Solano Town Center,
Cordelia Library, and other
locations. There is no comparable
fixed route service in the Green
Valley region. We expect the
successful technology provider to
determine where boarding and
alighting locations for the on -
demand service are placed.
Service Span
6 a. m. — 8 p. m. Weekdays
8 a. m. — 6 p. m. Saturdays
No service on Sundays
Estimated Revenue Hours per
Day
Up to 28. 2 on Weekdays
Up to 20. 4 on Saturdays
14
Rider Experience
Wait times of less than 20 minutes
Travel times of less than 30 minutes
Zone 2 — Southeast Fairfield/ Travis Air Force Base
Zone 2 will replace current Routes 2 and 4 and provide service to the Southeast and Central portions of the City, plus on -demand service to the Travis Air Force Base front gate, David Grant Medical Center, and the Fairfield -Vacaville Train Station. The service will connect riders to key locations outside the zone such as the Solano Town Center and Fairfield Transportation Center. This zone may expand north to portions of Paradise Valley and to Paradise Valley Estates. In that event, an additional vehicle would be added to manage the increased demand.
Service Span
6 a. m. — 8 p. m. Weekdays
8 a. m. — 6 p. m. Saturdays
No service on Sundays
Estimated Revenue Hours per Day
Up to 28. 2 on Weekdays
Up to 20.4 on Saturdays
Rider Experience
Wait times of less than 20 minutes
Travel times of less than 30 minutes
15
In addition to the Zones listed above, the software solution must be able to provide service -area wide complementary paratransit reservationing, dispatch, and system management.
Phase 2 — Service Expansion
FAST intends to expand on -demand microtransit throughout its service area in mid-2023. As part of this expansion, proposals will be considered that would provide reservation, dispatch, and system management microtransit and paratransit services in separate modules or that would provide a reservation, dispatch, and system management of both services in a commingled fashion.
Project Duration
FAST anticipates a 2- year project term, with three 1- year options.
Proposed Project Timeline
The City of Fairfield reserves the right to adjust the below schedule as circumstances warrant.
Highest Rated Firm Selected
City Council Approval
Phase 1 Service Launch
Phase 2 Service Launch
September 1, 2022
October 18, 2022
February 4, 2023
Mid -late 2023
Remainder of Page Intentionally Left Blank]
SECTION 5: Specifications
A. Project Overview
The City of Fairfield is releasing this request for proposals ( RFP) to procure an on - demand and in -advance scheduling, dispatch and management solution (" Mobility Platform") to manage all services that are not run as a traditional fixed -route on fixed -schedule using a single product (this may include multiple modules within the same product), in the form of Software as a Service (SaaS). The Mobility Platform will be required to accomplish the following functions:
1. Design, launch and manage flexible/ on -demand general public demand response transit (DRT)/ microtransit services as specified in Section 2.
2. Manage specialized demand response services and ADA paratransit services as specified in Section 3.
B. Project Goals
1. Provide cost efficient and effective service so that FAST can serve as many people as possible within available resources, including the ability to maximize shared rides to the extent possible.
2. Provide high quality customer service.
3. Provide equitable service that benefits all populations, including disadvantaged populations.
4. Attract new riders to public transit.
C. General Public Demand Response and Microtransit Service Specifications The Mobility Platform will support a range of DRT/microtransit services including but not limited to the following:
1. Point-to-point / Zone -based Service: refers to point-to- point service designed to serve residents within a defined geographic service zone.
2. Fixed -route Connector / Feeder: refers to a demand responsive service that is primarily designed to serve a defined checkpoint on a fixed route network (stop or station), often acting as a first/last mile connector service.
3. ADA Paratransit Alternative: services specifically designed to serve customers that qualify for ADA paratransit but exceed the criteria as defined in the ADA paratransit regulations in 49 CFR 37 ( https, Hwww.transit.dot.gov/regulations- and-guidance/ civil- rights- ada/ part-37-transportation- services -individuals -disabilities).
These services will include in -advance and will -call trip requests. 17
Examples are:
i. Utilization of consumer choice model to provide same day service; and H. Providing service to previously certified ADA eligible customers that may not be within a 3/4 mile buffer of a fixed route ( e.g., due to fixed route service reduction) and eventually offering ADA-eligible customer service citywide.
D. ADA Paratransit Service Specifications
The Mobility Platform will support paratransit services as follows:
1. Scheduling
i. The system shall provide the capability to manually override details of scheduled trips where needed to meet ADA standards, including negotiation window.
ii. The system shall notify the dispatch representatives or the customer upon booking when the number of permitted trips for a pre -determined timeline for a specific billing code has been reached.
iii. The system shall notify the customer service representative upon booking if a customer is approaching the expiration of their eligibility status. iv. The system shall notify the customer of an approaching expiration date via a message on website and mobile app, and voice message on the IVR upon booking.
v. The system shall permit the booking of subscription trips. a. The system shall at least provide daily, weekly, and monthly subscription trip booking options.
b. The system shall permit the suspension of subscription trips by entering the start date and end date of the suspension period. c. The system shall automatically suspend subscription trips on non - service days such as holidays.
d. The system shall notify the customer when a subscription trip has been suspended via a message on website and mobile app, and voice message on the IVR.
e. The system shall notify the customer the duration of which a subscription trip has been suspended via a message on website and mobile app, and voice message on the IVR.
18
vi. The system shall prioritize scheduling of ADA paratransit trips. Also, ADA paratransit trips, once scheduled, shall be anchored ( i. e., not modified) during batch or continuous optimization process.
vii. The system shall allow booking of return trip upon customer request and shall automatically fill out the information using the previous original trip information.
viii. Return trips should be bookable with the original outbound trip request.
2. Operations Management
The system shall allow management of trips in real-time as described. All operations management functions shall strictly follow the guidelines as required for the management of ADA paratransit trips.
ii. The system shall provide the capability to manually override where needed to meet ADA service standards.
iii. The system shall permit manual overriding of trip negotiations when necessary to meet ADA standards.
iv. The system shall automate violation notices issuance upon the day of violation.
v. The system shall provide a printable version of the automated notice that will include the customers' mailing address.
vi. The system shall provide a daily report of trip violations where all printable notices will be accessible.
3. Clipper 2 Paratransit Requirements
The Metropolitan Transportation Commission ( MTC), along with transit operators in the greater San Francisco Bay Area, is in the process of implementing the Next Generation Clipper® Fare Collection System (" Clipper"), an account -based regional fare collection system designed to replace the existing card -based system. The new system is expected to be operational in 2023 and includes the development of a standardized application programming interface (API) to integrate with paratransit scheduling and dispatch systems. This interface will allow fares for a trip booked through a paratransit scheduling system to be paid from the customer's Clipper account.
To support this integration, the paratransit scheduling and dispatch software system shall include the following:
10
i. An interface with the new Clipper system through a bi- directional application programming interface (API), to be defined by the Clipper contractor, Cubic Transportation Systems.
ii. Functionality to:
a. Associate a customer's paratransit account and/ or booking with the customer's Clipper account number, and store that account number as a payment method;
b. Determine and record, at the time of booking, the applicable fare for the paratransit trip;
c. Issue and receive a Clipper account balance check via the API, at the time of booking, to confirm that the Clipper account is valid and has sufficient balance or a valid fare product for the trip; d. Issue a payment request via the API for the value of the trip to the Clipper system upon a trip being successfully performed; e. Issue a fee or charge for a no- show via the API ( this feature may or may not be used, but the functionality is required);
f. Issue a Clipper account credit via the API; and
g. Receive confirmation for all actions issued.
iii. Ability to access Clipper websites using the paratransit dispatch workstation no direct application integration is required, but operations staff must be able to use the same workstation for dispatch functions and for obtaining Clipper customer service information).
Additionally, the paratransit scheduling and dispatch software Contractor shall:
i. Participate in periodic technical discussions and coordination with MTC, its technical representatives, and representatives from the Clipper contractor Cubic);
ii. Provide test software, portals, or simulators to the Clipper contractor to test the operation of the API; and
iii. Participate in joint software and API design, development, testing, and implementation with the Clipper contractor.
E. Implementation Services
The successful firm shall be responsible for the following project management tasks:
20
1. Providing a functionality matrix identifying key features.
2. Developing and implementing a training plan.
3. Designing and testing the system.
4. Providing a rollout plan for each phase.
5. Providing and having approved a service level agreement for support (SLA).
6. Supporting FAST' s marketing efforts.
7. Providing ongoing technical support.
Remainder of Page Intentionally Left Blank]
21
I, .
EXPERIENCE AND REFERENCES
Client Contact Location
Contract Start Date Contract End Date Number of Vehicles Average Daily Trips Average Daily Trips Agency/ Business) ( name/ email/ phone) ( City/ State) ( Contract Start( Contract Start +6 mos) 22
SECTION 7
FEATURE CHECKLIST
Graphical user interface to create service area( s) including ability to exclude areas from geofenced region Solution should be cloud based - no backoffice hardware should be required System sandbox to test new regions and train system administrators Ability for parameters to be set into system for 30- minute window as required by ADA m Ability to input client eligibility information for ADA Ability to assign and remove vehicles to/ from the service Ability to ensure service complies with Wage Order 9
Ability to assign vehicles to multiple zones
Manual control or override to shift rides from one vehicle to another or other reasons The ability to adjust different service times for different service areas E Secure authorization for various levels ofthe daily management team Ability to add and remove vehicles on demand
Field supervision interface to monitor and make changes to vehicles currently in operation
2. Ability to playback trips for any vehicle up to 30 days Provide information about offline and not in service vehicles Heat maps of pickups and drop offs to pre -position vehicles Travel Time
E Wait Time
o E Number of Vehicles and optimization of vehicle miles traveled m o
Service Area
Ability to customize algorithm by time of day and geofenced location Capture National Transit Database (NTD( data and provide required reports o Capture key performance indicators set by FAST- at a minimum will include productivity, key paratransit metrics, etc Detailed fare information
Heat maps of pickups/ drop offs and staging
cApp usage statistics including but not limited to (opens/ closes, usage( G Ability to download all raw data
u°
Creation of" custom reports
Pull reports for trip denials, missed trips and excessively long trips as defined by the American Disabilities Act (ADA) Ability to create and export a GTFS- Flex feed
Interface for Agency to communicate directly with passengers based on location, origin, destination, email address, disruption, etc. o v, w Automated messages that provide information to riders for any reason including areas such as cancelations due to vehicle capacity Ability to distribute promotion codes
EE Custom and canned push notifications
3 Ability for Agency to create targeted marketing campaigns to riders of the system c Agency branded application
n Free app located on Android or Apple App store
N Service only viewable to riders
o n Authentication using " Sign on with Apple" or " Sign on with Google" or other agency approved method Display map with active vehicles upon login
Book a ride through the agency -branded Providers' app or through the agency call center with Agency able to easily utilize existing customer account information
Ability for agency to provide either pooling/ shared stops or door to door stops Including walking directions for riders in the event of pooled stops Ability to walk up to vehicle, board and pay
Ability to book in advance and for multiple days
Ability to book for multiple riders
Ability to book trips on demand
Provide ETA prior to confirming a trip
oa Ability to include key information on rider profile such as wheelchair or bike rack needs m
Show vehicles in real-time moving on the map
Accessibility functions including voice over/ text to speech Ability to add equipment details as needed for ADA
Ability to add a service animal
Ability to show actual ETA for drop off and vehicle location based on traffic and other real-time conditions 23
SECTION 7
FEATURE CHECKLIST
Feature Checklia" Wow, Feature Exceptions/Alternatives
Feature Criteria Function Yes No If No describe alternative or approximate date when feature will be deployed
Include links back to Agency sites to provide riders with information Integration with Token Transit
E Ability to pay Cash
Ability to integrate in the future with Clipper 2
Fare payment to be collected at time of boarding
Rider account setup storing payment preference and other key information securely Provide feedback on trip and driver
E Links to Providers' customer service for technical support ( app issues, login issues, etc) oLinks to Agency for trip issues (delays, events, lost and found, etc) Display information on ride history, payment, and other key data points j w Share app with new riders to get rewards
Ability to share ride with social media or send EFA to a contact Simple sign on/ off
Mid -trip relief sign on/ off
Ability for dispatch or driver to pause and unpause service Administration to prevent drivers from deactivating service E a
Provide and receive canned messages from dispatch
Report issues with ride or client to dispatch
Provide driver activity metrics (in service, travel, wait times, etc) Provide guidance on where to stop
T Provide continuously updated, turn -by -turn directions Provide guidance to customer that vehicle is on location with customizable ( only by central management) timing window before vehicle departs o Prevent distracted driving
o'oc Provide a " can' t see rider/ no show' option
React to service anomalies such as a route deviation, unexpected traffic, vehicle breakdowns, and accidents Provide " e- manifest" including next trip or next several trips Incorporate predictive logic to identify and address potential problems before they occur Confirm a pre -booked passenger
Identify the rider as the account holder and person who booked the trip 2 Ability to add family accounts or caretake accounts
Confirm that the rider has been picked up
Group notifications in the event of multiple pickups/ drop offs Boarding and no showing of riders must be made only within prescribed distance of p.pickup/ cku/dropoff drop location Hardware onvehicles must be vibration and shock resistant Hardware should interface with existing vehicle connections (.e. power) 3 Hardware should be updatable over the air Hardware
Hardware
should use modern mobile operating system (IOS/ Android) s should bereplaceable by FAST Hardware
should observe a99% u time
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
insured, whichever is greater.
C) ACCEPTABILITY OF INSURER. Insurance is to be placed with insurers with a current A. M.
Best' s rating of no less than A:VII, unless otherwise acceptable to the City. d) VERIFICATION OF COVERAGE. CONSULTANT shall furnish the CITY with original endorsements effecting coverage required by this Exhibit D. The endorsements are to be signed by a person authorized by that insurer to bind coverage on its behalf. The endorsements are to be on forms equivalent to CG 20 10 1185 subject to CITY approval. All insurance certificates and endorsements are to be received and approved by the CITY before work commences, these documents must be submitted electronically through the Exigis insurance system, certificates-fairfield@riskworks. com. At the request of the CITY, CONSULTANT shall provide complete copies of all required insurance policies, including endorsements effecting the coverage required by these specifications.
e) SUB -CONTRACTORS. Service Provider shall require all subcontractors to procure and maintain insurance policies subject to the requirements of Exhibit D. Failure of Service Provider to verify existence of sub -contractor' s insurance shall not relieve Service Provider from any claim arising from sub -contractors work on behalf of Service Provider.
Rev. 6/ 17/ 2018 Page 973 of 1497
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
3) INSURANCE PROVISIONS
a) DEDUCTIBLES AND SELF -INSURED RETENTIONS. Any deductibles or self- insured retentions must be declared to and approved by the City. At the option of the City, either the insurer shall reduce or eliminate such deductibles or self -insured retentions as respects the City, its officers, officials, employees and volunteers; or the Service Provider shall procure a bond guaranteeing payment of losses and related investigations, claim administration and defense expenses.
b) The general and automobile liability policies ( and if applicable, cyber liability, garage keepers liability and builder' s risk policies) are to contain, or be endorsed to contain, the following provisions:
i) The City, its officers, officials, employees and volunteers are to be covered as insureds as respects: liability arising out of work or operations performed by or on behalf of the Service Provider; products and completed operations of the Service Provider; premises owned, occupied or used by the Service Provider; and automobiles owned, leased, hired or borrowed by the Service Provider. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officers, officials, employees or volunteers.
ii) For any claims related to this project, the Service Provider' s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees and volunteers. Any insurance or self -insured maintained by the City, its officers, officials, employees or volunteers shall be excess of the Service Provider' s insurance and shall not contribute with it.
iii) Any failure to comply with reporting or other provisions of the policies including breaches of warranties shall not affect coverage provided to the City, its officers, officials, employees or volunteers. iv) The Service Provider' s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer' s liability.
V) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days' prior written notice by certified mail, return receipt requested, has been given to the City. vi) The policy limits of coverage shall be made available to the full limits of the policy. The minimum limits stated above shall not serve to reduce the Service Provider' s policy limits of coverage. Therefore, the requirements for coverage and limits shall be ( 1) the minimum coverage and limits specified in this agreement, or (2) the broader coverage and maximum limits of coverage of any insurance policy or proceeds available to the named Rev. 6/ 17/ 2018 Page 974 of 1497
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
EXHIBIT " D"
INSURANCE REQUIREMENTS
Service Provider shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Service Provider, its agents, representatives, or employees.
1) MINIMUM SCOPE AND LIMITS OF INSURANCE
a) Commercial General Liability coverage ( occurrence Form CG 00 01) with minimum limits of $ 1, 000,000 per occurrence for bodily injury, personal injury, products and completed operations, and property damage. If Commercial General Liability or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/ location or the general aggregate limit shall be twice the required occurrence limit. b) Automobile Liability coverage ( Form CA 00 01 with Code 1 — any auto) with minimum limits of $1, 000,000 per accident for bodily injury and property damage. c) Workers' Compensation insurance as required by the State of California and Employers' Liability insurance, each in the amount of $1, 000,000 per accident for bodily injury or disease.
2) INDUSTRY SPECIFIC COVERAGES
If checked below, the following insurance is also required.
Professional Liability Insurance / Errors and Omissions Liability in the minimum amount of $1, 000,000 per occurrence.
Cyber Liability Insurance in the minimum amount of $1, 000,000 per occurrence Garage Keepers Insurance in the minimum amount of $1, 000,000 per occurrence Fidelity / Crime / Dishonesty Bond in the minimum amount of $ MCS- 90 Endorsement to Business Automobile insurance for transportation of hazardous materials and pollutants
Builder' s Risk / Course of Construction Insurance in the minimum amount of Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
15) GOVERNING LAW AND VENUE. This Agreement shall be governed by the laws of the State of California and, in the event of litigation, venue will be in the County of Solano. 16) PROPRIETARY AND CONFIDENTIAL INFORMATION. Service Provider agrees that all of the information it obtains from City constitutes City' s confidential property ("Confidential Information") regardless of whether such information is pre -marked as confidential or in any other manner to indicate its confidential nature. Except as expressly authorized herein, Service Provider agrees to hold in confidence and not disclose any Confidential Information. Service Provider further agrees to establish such systems and procedures as may be reasonable to maintain City' s Confidential Information. Service Provider' s nondisclosure obligation shall not apply to information which Service Provider can document: (a) was rightfully in its possession or known to it prior to receipt of the Confidential Information; ( b) is or has become public knowledge through no fault of Service Provider; ( c) is rightfully obtained by Service Provider from a third party without breach of any confidentiality obligation; or (d) is required to be disclosed pursuant to the order or requirement of a court, administrative agency, federal law, foreign state law, California state law, applicable regulatory authorities, or other governmental body.
17) DIVULGING OF CONFIDENTIAL OR PROPRIETARY INFORMATION. Should City require the services of a third party to operate, maintain or modify the Product(s) nothing in this Agreement shall preclude City from doing so. City shall provide Service Provider with as much notice as practicable before utilizing or divulging any proprietary information or trade secrets so that Service Provider may coordinate and or limit the delivery of said information to the third party necessary to accomplish said operation, modification or maintenance. Any third party receiving Confidential or Proprietary Information or trade secrets under this paragraph must agree to the same prohibition against disclosure as City.
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
residents to work on city projects. Local resident is defined as a person who resides in Solano County. The City encourages an active affirmative action program on the part of its contractors, sub -contractors, and developers. When local projects require, subcontractors, contractors, consultants and developers will solicit proposals from qualified local firms where possible.
As a way of responding to the provisions of the Davis -Bacon Act and this program, contractor, consultants, and developers will be asked, to provide no more frequently than monthly, a report which lists the employee' s name, job class, hours worked, salary paid, city of residence, and ethnic origin.
12) SERVICE PROVIDER NOT A PUBLIC OFFICIAL. Service Provider is not a " public official" for purposes of Government Code §§ 87200 et seq. Service Provider conducts research and arrives at his or her conclusions, advice, recommendation, or counsel independent of the control and direction of the City or any City official, other than normal contract monitoring. In addition, Service Provider possesses no authority with respect to any City decision beyond these conclusions, advice, recommendation, or counsel.
13) EMPLOYMENT DEVELOPMENT DEPARTMENT REPORTING REQUIREMENTS. When the City executes an agreement for or makes payment to Service Provider in the amount of $ 600 ( six hundred dollars) or more in any one calendar year, Service Provider shall provide the following information to City to comply with Employment Development Department ( EDD) reporting requirements:
a) Whether Service Provider is doing business as a sole proprietorship, partnership, limited liability partnership, corporation, limited liability corporation, non- profit corporation or other form of organization.
b) If Service Provider is doing business as a sole proprietorship, Service Provider shall provide the full name, address and social security number or federal tax identification number of the sole proprietor.
C) If Service Provider is doing business as other than a sole proprietorship, Service Provider shall provide Service Provider' s federal tax identification number. 14) NOTICES. All notices shall be given in writing to the following addresses or other such addresses as the parties may designate by written notice:
To City: City of Fairfield
Attn: Jeffrey Bertany
c/ o IT Department
1000 Webster Street
Fairfield, California 94533
To Service Provider:
Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
City at the discretion of the City Manager, or his/ her designee, upon written notification to Service Provider. Service Provider is entitled to receive full payment for all services performed and all costs incurred up to and including the date of receipt of written notice to cease work on the project.
Service Provider shall be entitled to no further compensation for work performed after the cancellation date. All completed and incomplete reports and documents of the Service Provider provided under this Agreement up to the date of receipt of written notice to cease work shall become the property of City.
9) INDEMNIFY AND HOLD HARMLESS.
a) If AGREEMENT is an agreement for design professional services subject to California Civil Code § 2782. 8( a) and Service Provider is a design professional, as defined in California Civil Code § 2782. 8( c)( 2), to the fullest extent allowed by law, Service Provider shall hold harmless, defend and indemnify the City, its officers, agents, employees, and volunteers from and against all claims, damages, losses, and expenses including attorneys' fees arising out of, or pertaining to, or relating to the negligence, recklessness, or willful misconduct of the Service Provider, except where caused by the active negligence, sole negligence, or willful misconduct of the City.
b) If AGREEMENT is not an agreement for design professional services subject to California Civil Code § 2782. 8( a) or Service Provider is not a design professional as defined in subsection 10( a) above, to the fullest extent allowed by law, Service Provider shall indemnify, defend, and hold harmless the City, its officers, agents, employees and volunteers from all claims, suits, or actions of every name, kind and description, brought forth on account of injuries to or death of any person or damage to property arising from or connected with the willful misconduct, negligent acts, serious errors or omissions, ultra -hazardous activities, activities giving rise to strict liability, or defects in design by Service Provider or any person directly or indirectly employed by or acting as agent for Service Provider in the performance of this Agreement, including the concurrent or successive passive negligence of the City, its officers, agents, employees or volunteers.
It is understood that the duty of Service Provider to indemnify and hold harmless includes the duty to defend as set forth in Section 2778 of the California Civil Code.
Acceptance of insurance certificates and endorsements required under this Agreement does not relieve Service Provider from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply whether or not such insurance policies are determined to be applicable to any such damages or claims for damages.
Service Provider' s responsibility for such defense and indemnity shall survive termination or completion of this agreement for the full period of time allowed by law. 10) PROHIBITED INTERESTS. No employee of the City shall have any direct financial interest in this agreement. This agreement shall be voidable at the option of the City if this provision is violated.
11) LOCAL EMPLOYMENT POLICY. The City desires wherever possible, to hire qualified local Rev. 6/ 17/ 2018
CITY OF FAIRFIELD
TECHNOLOGY SOFTWARE -AS -A -SERVICE AGREEMENT
EXHIBIT " C"
GENERAL PROVISIONS
1) INDEPENDENT SERVICE PROVIDER. At all times during the term of this Agreement, Service Provider shall be an independent contractor and shall not be an employee of City.
City shall have the right to control Service Provider only insofar as the results of Service Provider' s services rendered pursuant to this Agreement; however, City shall not have the right to control the means by which Service Provider accomplishes services rendered pursuant to this Agreement. 2) LICENSES; PERMITS; ETC. Service Provider represents and warrants to City that Service Provider has all licenses, permits, qualifications, and approvals of whatsoever nature which are legally required for Service Provider to practice Service Provider' s profession. Service Provider represents and warrants to City that Service Provider shall, at its sole cost and expense, keep in effect at all times during the term of this Agreement, any licenses, permits, and approvals which are legally required for Service Provider to practice his profession. 3) TIME. Service Provider shall devote such services pursuant to this Agreement as may be reasonably necessary for satisfactory performance of Service Provider' s obligations pursuant to this Agreement.
4) SERVICE PROVIDER NOT AN AGENT. Except as City may specify in writing, Service Provider shall have no authority, express or implied, to act on behalf of City in any capacity whatsoever as an agent. Service Provider shall have no authority, express or implied, pursuant to this Agreement, to bind City to any obligation whatsoever. 5) ASSIGNMENT PROHIBITED. No party to this Agreement may assign any right or obligation pursuant to this Agreement. Any attempted or purported assignment of any right or obligation pursuant to this Agreement shall be void and of no effect. 6) PERSONNEL. Service Provider shall assign only competent personnel to perform services pursuant to this Agreement. In the event that City, in its sole discretion, at any time during the term of this Agreement, desires the removal of any person or persons assigned by Service Provider to perform services pursuant to this Agreement, Service Provider shall remove any such person immediately upon receiving notice from City of the desire of City for the removal of such person or persons.
7) STANDARD OF PERFORMANCE. Service Provider shall perform all services required pursuant to this Agreement. Services shall be performed in the manner and according to the standards observed by a competent practitioner of the profession in which Service Provider is engaged in the geographical area in which Service Provider practices his profession. All products which Service Provider delivers to City pursuant to this Agreement shall be prepared in a workmanlike manner and conform to the standards of quality normally observed by a person practicing in Service Provider' s profession. City shall be the sole judge as to whether the product of the Service Provider is satisfactory.
8) CANCELLATION OF AGREEMENT. This Agreement may be canceled at any time by the Rev. 6/ 17/ 2018